C013-Ya-Cs-006002-02 Memoria de Cálculo - Viales Internos y Viales de Acceso
C013-Ya-Cs-006002-02 Memoria de Cálculo - Viales Internos y Viales de Acceso
LYNKA
02 18/Nov/2022 Second issue M. ZAGARIA I. COLLADON
R.Agüera
LYNKA
MOD-A4-E_Is.00
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 2 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
CONTENTS
1 INTRODUCCIÓN ...................................................................................................................... 4
1.1 OBJETO ........................................................................................................................ 4
1.2 DOCUMENTOS DE REFERENCIA ............................................................................... 4
2 GLOSARIO DE TÉRMINOS Y UNIDADES .............................................................................. 4
3 UBICACIÓN Y CONDICIONES AMBIENTALES ..................................................................... 5
3.1 UBICACIÓN ................................................................................................................... 5
3.2 CONDICIONES AMBIENTALES ................................................................................... 6
4 DESCRIPCIÓN DEL PROYECTO ............................................................................................ 7
5 LEYES Y REGULACIÓN .......................................................................................................... 7
6 ANÁLISIS DEL TERRENO ....................................................................................................... 8
7 CÁLCULO DE PAVIMENTOS ................................................................................................ 10
7.1 ASPECTOS GENERALES .......................................................................................... 10
7.2 CÁLCULO DE SECCIÓN MEDIANTE LA METODOLOGÍA AASHTO ......................... 15
7.3 RESULTADOS ............................................................................................................ 19
MOD-A4-E_Is.00
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 3 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
INDICE DE TABLAS
INDICE DE IMÁGENES
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 4 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
1 INTRODUCCIÓN
El presente informe tiene como objeto presentar una descripción de la planta fotovoltaica La Perla.
Está situada en la comuna de Los Ángeles, provincia de Bio bío, región de Bio bío, Chile. Tendrá una
potencia pico de 6,42 MWp, ocupará un área aproximada de 9,88 Ha.
1.1 OBJETO
El objeto de este documento es especificar la red de caminos internos y externos para el acceso al
parque solar fotovoltaico, así como el dimensionamiento del firme y el movimiento de tierras requerido
para su construcción.
A continuación, se describen las mínimas características geométricas que dispondrán los caminos
para ofrecer una efectiva comunicación viaria con la planta. Asimismo, este documento recoge los
problemas existentes que se han identificado durante el proceso de diseño y cómo se han abordado.
Cabe destacar que todas las unidades de medidas utilizadas en el informe están basadas en el
Sistema Internacional de medidas (SI). Las abreviaturas empleadas en el desarrollo de la memoria se
recogen en la Tabla 2:
cuadrados
ºC Grados centígrados
m/s Metros por segundo
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 5 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
3.1 UBICACIÓN
El Proyecto se encuentra ubicado a unos 3,0 km al sureste del centro de la ciudad de Los Ángeles por
ruta Q-61, perteneciente a la comuna del mismo nombre, en la Región del Bio bío, Chile. La ubicación
del sitio se presenta en las siguientes imágenes.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 6 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
CARACTERÍSTICAS DE PROYECTO
Potencia Pico 6,42 MWp
Potencia CA 5 MW
Ubicación Los Ángeles, Bio bío (Chile)
Longitud -72,208426°
Latitud -37,516931 °
X: 746277,63 E
Y: 5843513,76 N
Coordenadas X,Y
Datum WGS 84
MOD-A4-E_Is.00
Huso 18H
Área total (dentro del cerco) 9,88 Ha
CONDICIONES CLIMÁTICAS
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 7 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
La Planta Fotovoltaica contará con un área total de instalación de 9,88 Ha. El parque solar albergará
un total de 14.784 módulos con una potencia de 645/650/655 Wp por módulo y una capacidad total
de 9.600 kWp.
A continuación, se recogen las principales características de la instalación:
5 LEYES Y REGULACIÓN
El diseño debe cumplir con todas las normativas locales, nacionales e internacionales que sean de
aplicación.
En la tabla siguiente se listan los principales documentos de referencia utilizados para el diseño del
presente informe.
# Documento
Guía de diseño estructural de pavimentos para caminos de bajo volumen de tránsito, Dirección
1
de Vialidad, Ministerio de Obras Públicas de Chile
Manual de Carreteras, Volumen Nº3, Instrucciones y Criterios de Diseño, Dirección de Vialidad,
2
MOD-A4-E_Is.00
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 8 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
Para analizar las condiciones y características del terreno se dispone del estudio geotécnico “C013-
YG-RS-00200-01 INFORME GEOTECNICO”, desarrollado por la empresa GDE Consultores
Geotécnicos, en el que se describe la campaña de reconocimiento geotécnico en campo y los
resultados de los ensayos.
Se llevaron a cabo 7 calicatas de exploración para la correcta identificación de los materiales que
constituyen las capas más superficiales del terreno a lo largo de las parcelas afectadas por la
instalación solar fotovoltaica y la determinación de la excavabilidad de las mismas.
El espesor de la capa de terreno vegetal identificada en las catas por el estudio geotécnico varía entre
0,30 y 0,40 m.
Se han detectado los siguientes horizontes:
Horizonte Cotas Limites [m] Espesor [m] Descripción Estratigráfica
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 9 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
Relleno
Parámetro H-2 H-3 estructural
compactado (**)
Arena media a Arena media a
gruesa algo limosa, gruesa, color gris
Tipo de suelo color café grisáceo, oscuro, -
compacidad media a compacidad
densa. densa.
En promedio,
Profundidad a la que aparece el En promedio, variable
variable entre 0,70 -
suelo de fundación, [m] (*) entre 0,30 a 0,40
y 1,10
Densidad natural [t/m3] 2,02 2,02 2,10
Humedad [%] 17,0 20,0 12,0
Ángulo de fricción interna, ϕ [°] 35 35 35
Cohesión, c [t/m2] 1,00 0,50 0,50
Resistencia al corte no drenada, SU
10,0 --- -
[t/m2] (***)
Coeficiente de Poisson, ʋ 0,33 0,33 0,33
Módulo de deformación estático, E
1.000 1.000 3.000
[t/m2]
Módulo de deformación dinámico,
3.000 3.000 9.000
Ed [t/m2]
Imagen 4 Características del terreno
Para el diseño y construcción de los pavimentos interiores del proyecto, se recomienda el retiro de al
menos unos 40 [cm] superficiales, asegurándose de retirar cualquier material suelto u cualquier otro
que no corresponda al definido en el horizonte H-2 del modelo estratigráfico.
Una vez realizado el escarpe, la subrasante correspondiente arenas algo limosas, (horizonte H-2 del
modelo estratigráfico), se deberá compactar al 95 [%] del Proctor modificado, o bien, a una densidad
relativa de 80 [%].
Asimismo, para efectos de diseño de pavimentos, se recomienda utilizar como valor de CBR para la
subrasante, los valores que se muestran en la tabla siguiente, según tipo de suelo de subrasante.
El relleno estructural utilizado para la rasante de los viales del proyecto debe ser colocado en capas
no mayores a 25 cm y compactadas al 95% del ensayo Proctor Modificado (PM). El material utilizado
como relleno debe cumplir con una clasificación mínima de A-2-4 según la AASHTO.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 10 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
7 CÁLCULO DE PAVIMENTOS
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 11 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
El periodo de diseño adoptado es de 25 años tanto para viales internos como viales de
acceso.
Se define lo siguiente:
Fase de construcción: 1 camión pesado por día, durante varios meses (se asumirá 9
meses).
Para los caminos internos se utilizará la estratigrafía para caminos de tránsito liviano (Eliv)
con un tránsito prioritariamente liviano. Sin embargo, la estratigrafía para el camino de
acceso será de tránsito pesado (Epes) en el cual flujo de tránsito es compartido por
MOD-A4-E_Is.00
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 12 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 13 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 14 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
Rango de solicitaciones de
T1
tránsito por sentido
Rango Capacidad de Tratamiento Superficial.
S3 Base granular de 17cm de
Soporte de la Subrasante
espesor, CBR 80%.
Tipo de clima Normal Subbase Granular de 17cm de
espesor, CBR 40%.
Cartilla
Selección de cartilla
Nº2
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 15 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
Se define lo siguiente:
Fase de construcción: 1 camión pesado por día, durante varios meses (se asumirá 9
meses). No existe información con respecto a vehículos ligeros, por lo que se asumirá
una media de 10 vehículos ligeros al día.
Cada camión constará de dos ejes de 12 T, por lo que por cada camión se deben considerar 4 ejes de
12 T correspondiente a la ida/vuelta y a tener doble eje (2*2 = 4). Se considera 9 meses (270 días)
para la fase de construcción, y 25 años para la fase de operación, donde se estima 1 camión cada 6
meses. De esta forma se obtiene que el número de ejes equivalentes de 12 T que circularán durante
la vida útil es:
‐ Camiones pesados: 𝑁 4 270 4 2 25 1.280 𝑒𝑗𝑒𝑠 𝑑𝑒 12 𝑇
Para el caso de los vehículos ligeros, se asumirán como ejes de 2 T contando con la ida/vuelta.
‐ Vehículos ligeros: 𝑁 10 2 270 2 52 25 8.000 𝑒𝑗𝑒𝑠 𝑑𝑒 2 𝑇
Para continuar con el cálculo, se requiere transformar los diferentes tipos y pesos de ejes que circulan
por un camino a un único eje patrón, eje simple de rueda doble de 80 kN de peso, por lo que se debe
realizar una conversión de los ejes de 12 T y 2 T a los de 8 T.
Los vehículos más pesados reducen la vida útil de los pavimentos mucho más que los vehículos más
ligeros, cumpliéndose la llamada Ley Generalizada de la Cuarta Potencia, la cual explica que el daño
causado por los ejes de los vehículos es "proporcional a la cuarta potencia de la relación entre el peso
del eje y el peso de un eje estándar".
En nuestro caso, para transformar los ejes de 12 T en ejes de 8 se debe multiplicar los ejes de 12 T
por el cociente 5,0625
Para transformar los ejes de 2 T en ejes de 8 se debe multiplicar los ejes de 2 T por el cociente
0,0039.
De esta forma, se obtiene que el tránsito a considerar será de
MOD-A4-E_Is.00
‐ Total ejes equivalentes: 1.280 5,0625 8.000 0,0039 6.511 ejes equivalentes.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 16 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
2. Subrasante
Tal y como se ha indicado en el apartado 7.1.3 se considera para los diseños un valor del CBR de la
subrasante del 10 %. Este valor equivale a un módulo resiliente de 76,83 MPa (MR=17,6·CBR0,64), es
decir, 11.143,25 psi.
Serviciabilidad
El pavimento se diseña para que sirva por un determinado lapso llamada vida útil o periodo de diseño,
que se refiere al periodo durante el cual la serviciabilidad se mantiene dentro de ciertos límites.
El estado inicial del pavimento se define con un índice de serviciabilidad inicial (𝑝 ) que depende
exclusivamente de las posibilidades tecnológicas disponibles para construirlo. En el caso de
pavimentos flexibles, el Manual de Carreteras recomienda adoptar el valor 𝑝 4.2.
Al final de la vida útil el pavimento habrá alcanzado un nivel de deterioro considerado como final o
inconveniente para transitar, al cual corresponde el índice de serviciabilidad final 𝑝 . El Manual de
Carreteras considera un índice de 𝑝 2.0.
Confiabilidad y desviación estándar
El grado de confiabilidad de diseño se controla por el factor de confiabilidad (FR) que es función de
un valor asociado al nivel de confianza (R) de la distribución normal (ZR) y de la desviación normal
del error combinado (S0) de todos los parámetros que intervienen en el comportamiento del
pavimento.
En la tabla 3.604.104.A del Manual de Carreteras se recomiendan los niveles de confianza y valores
de desviación estándar a adoptar en función de las solicitaciones esperadas. Se ha utilizado un
coeficiente de variación del 25%, tal y como recomienda el Manual de Carreteras, según se muestra
en la imagen siguiente.
en la imagen siguiente.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 17 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
Además, se cuentan con gráficas del manual de la AASHTO, que se muestran en la imagen siguiente,
para obtener el valor del número estructural requerido, según se recoge en el siguiente diagrama.
SN DISEÑO =
Número estructural de
0,995 pulgadas =
viales internos y de acceso
25,27 mm
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 18 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
Capa 1: Base
PAVIMENTO
Capa 2: Subbase
Subrasante
Donde 𝑎 son los coeficientes estructurales de las diversas capas, ℎ los espesores de cada capa en
mm y 𝑚 los coeficientes de drenaje de las capas no tratadas.
Para el cálculo de los coeficientes estructurales de la base granular (𝑎 ) y subbase granular (𝑎 ), se
cuenta con formulaciones de acuerdo al manual chileno que relacionan el coeficiente estructural con
el CBR del material:
, ,
a 0.032 𝐶𝐵𝑅 0.032 80 0.1300
, ,
a 0.058 𝐶𝐵𝑅 0.058 40 0.1169
Para el caso del coeficiente de drenaje se ha considerado un valor de 1 para ambas capas granulares,
correspondiente a unas condiciones de humedad y de capacidad de drenaje medias, en base a las
indicaciones de la AASHTO, como se muestra en la imagen siguiente.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 19 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
7.3 RESULTADOS
En base a todo lo dispuesto en apartados anteriores, se define una sección tipo de viales internos y
viales de acceso con los siguientes espesores y características:
Por lo tanto, la sección definitiva a aplicar es la siguiente:
Capa Espesor
Capa base 0,10 m, CBR>80%
Sub base 0,15 m, CBR>40%
Subrasante CBR>10%
Tabla 10. Sección de diseño calculada mediante la metodología AASHTO
Base granular: el material a utilizar deberá estar clasificado A1 or A3 (de acuerdo a la ASTM D3282 o
AASHTO). El espesor de la capa será de 10 cm después de la compactación estando formada por material
granular y deberá tener una pendiente transversal de un 2% para permitir la correcta evacuación de
aguas. La capacidad de carga de esta capa deberá cumplir con un módulo de deformación de, al menos,
Md = 800 kg/cm2 y CBR=80%. El material deberá ser compactado hasta conseguir el 95% del Proctor
Modificado.
Subbase: el material a utilizar deberá estar clasificado A1 or A3 (de acuerdo a la ASTM D3282 o AASHTO).
El espesor de la capa será de 15 cm después de la compactación estando formada por grava o roca
triturada y la capacidad de carga de esta capa deberá cumplir con un módulo de deformación de, al
menos, Md = 400 kg/cm2 y CBR>40%. El material deberá ser compactado hasta conseguir el 95% del
Proctor Modificado.
Sub-rasante: una vez realizado el escarpe, para el suelo de subrasante correspondiente a la arena media
a gruesa algo limosa (H-2) deberá verificarse que el grado de compactación sea igual o superior al 95 %
del Proctor Modificado. De no cumplirse este requisito, se debe compactar para alcanzarlo. Se deberá
garantizar un CBR>10%.
SUBBASE GRANULAR
LL maximo: no aplica
MOD-A4-E_Is.00
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 20 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
TERRAPLÉN O RELLENOS
CBR: >10%
Grado compactación: 95% proctor modificado
LL máximo: <25%
TALUD DE CORTE
Para excavaciones hasta 1,5 m de profundidad, en cortes temporales o permanentes, se podrán
utilizar taludes de excavación 1:1 (V:H), sin sobrecarga superior en una franja de seguridad de 1,5 m
medidas desde el borde del talud.
Además, deberán llevarse a cabo actividades de conservación cuando los caminos alcancen el fin de
su vida útil. La emisión de polvo será controlada para evitar la afección a las instalaciones fotovoltaicas
y medio ambiente, al mismo tiempo que se mejora la visibilidad y la seguridad vial.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
CIVIL DESIGN CALCULATION REPORTS
MEMORIA DE CÁLCULO – VIALES INTERNOS
Y VIALES DE ACCESO C013-YA-CS-006002
ENGINEERING – Project
PV LA PERLA CHILE
Engineering
Sheet 21 / 21 Issue 02
Client Identification Code
PMGD PROJECTS (CHILE)
MVC Solar 38
7.3.4 DRENAJE
Se deberá diseñar y construir una red de drenaje, con un conjunto de cunetas de drenaje, tuberías y
bocas de acceso que conducirán las aguas pluviales a los puntos de descarga.
El principal objetivo de la red de drenaje es evacuar toda el agua superficial y el agua de escorrentía
para evitar posibles efectos erosivos en el terreno de la plata fotovoltaica. Para ello se ejecutarán
cunetas protegiendo los viales internos de la planta, de esta forma se evitará tanto su deterioro como
el de los elementos estructurales de la planta.