Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Codigo REV.
DPR-006 00
Finanzas
P'agina: 1 DE 3
Email Comprador
Manufactura 4,6
Reporte de Gastos
Competencia de Personal 3,4,6 Presupuesto Asignado a departamentos
Reporte de Requisiciones
Motivacion al Personal 3,4,6 Asignacion de Costos a finish good
4.- ¿Cómo? ) (Docs. sistema de Calidad) Finanzas 4,6 5.- Medición (Indicadores)
Satisfaccion al Cliente 4,6
Assigns budget to each department
The user quotes
The user creates a requisition Embarques 4,6 Eficiencia
The request is approved as per aproval matrix.
Purchasing team creates a PO
The material / service is received Procesos Subcontratados
Shelter (AP) processes the invoice externamente 4,6 Cumplimiento al Presupuesto
Shelter send the expense report to finance
Finance review report and send to AP for procesing Administracion (Shelter) 1,2,4 Efectividad
IT Informacion tecnologica
Cost by subelement report (Stoughton Remote Soport) 2,4 Asignacion de Costos antes de Embarque
Controller MX sends Open Order past due report
Download cost by subelement report Gestion de Proveedores Stoughton
Make pivot and review items with cost 0 Remote Soport 4
Download indented bill for items with cost 0
Check lot size with engineering team
Confirm routing and bom are final with engineering and processes team
Rollup Part number (pending)
Rollup Part number (frozen)
Asignacion de Costos
DPR-006 00
Página: 2 de 3
Proceso / Proveedor Cliente Entradas / Salidas Process/ Engineering NPI team Cost Accountant Controller MX
5. Review NO
items with End
cost 0
YES
Asiggn cost
Verify if
objective NO
11. Review drivers &
were met develop action plan.
YES
End
DIAGRAMA DE FLUJO Codigo REV.
EXPENSE CONTROL
DPR-006 00
Pagina 3 de 3
Proceso / Proveedor Cliente Entradas / Salidas Financial Analyst Manager Approval Buyer Accounts Payable Controller MX
1. Assigns budget to
Budget Inicio each department
2. Ask to quote
3. Make request
4. The request
is approved by Returned or
Requester YES direct manager NO Rejected Returned
Rejected
Fin
5. The
request is NO Returned or Returned
approved by Rejected
finance team Return the request
YES Rejected
Requisition Report
Expense report
7. The material is
received
Verify if
objective 11. Review drivers &
were met develop action plan.
End
Diagrama de Procesos Codigo REV.
Finanzas
DPR-006 00