INTEGRANTES
• RIOS CHUQUIMUNI, YARITZA ANDREA
• CHUMPITAZ FAUSTINO, ILANY KEYS
• MORENO ORBEGOSO, RULY ROCKY
• PINEDO PLASENCIA, DANY DANIEL
• MERINO CARMONA, FRANK MANUEL
• CALDERON MONZON, ALEX BRYAN
CURSO
COSTOS Y PREOSUPUESTOS
DOCENTE
LIMA – PERÚ
2022
TABLA DE CONTENIDO
RESUMEN .............................................................................................................................. 8
CONTENIDO ....................................................................................................................... 10
S/D .......................................................................................................................................... 13
OBRA ..................................................................................................................................... 15
2
02.04.00 PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO
03.01.03 EXCAV. C/I A MAQ. T.N. HASTA 1.5 P/TUB. D = 4"-6" .......................... 17
03.01.04 EXCAV. C/I A MAQ. T.N. HASTA 2.0 P/TUB. D = 4"-6" .......................... 17
03.01.10 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 1.5 D = 4"-6" INC.
C/ARENA .......................................................................................................................... 20
03.01.11 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.0 D = 4"-6" INC.
C/ARENA .......................................................................................................................... 20
3
03.01.12 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 1.5 D = 8"-10" INC.
C/ARENA .......................................................................................................................... 20
03.01.13 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.0 D = 8"-10" INC.
C/ARENA .......................................................................................................................... 20
03.01.14 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.5 D = 8"-10" INC.
C/ARENA .......................................................................................................................... 20
U.F. ..................................................................................................................................... 23
U.F. ..................................................................................................................................... 23
U.F. ..................................................................................................................................... 23
U.F. ..................................................................................................................................... 23
4
03.02.06 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 250 MM S-25
U.F. ..................................................................................................................................... 23
U.F. ..................................................................................................................................... 23
160MM ............................................................................................................................... 31
5
03.04.02 CONEXION DOMICILIARIA CON SILLA TEE PVC D=200MM X
160MM ............................................................................................................................... 31
160MM ............................................................................................................................... 31
ANEXO .............................................................................................................................. 39
CONCLUSIONES: ............................................................................................................... 51
REFERENCIAS: .................................................................................................................. 52
6
IMÁGENES
7
RESUMEN
componente del proyecto global “Ampliación y mejoramiento del sistema de agua potable y
alcantarillado del distrito de Moquegua” este proyecto se desarrolla en el centro poblado San
Los problemas que se presentaron en las redes de alcantarillados son la falta de capacidad de
colectores e interceptores, mal estado físico de los colectores y conexiones domiciliarias, uso
constructivos.
Se tiene en cuenta para el desarrollo del proyecto la topografía del terreno. Luego de investigar
zona es bastante accidentada que presenta pendientes mayores de 70°. A su vez la zona
presenta un clima seco, semicálido y soleado en el año, pero se divide en 2 épocas del año
como en enero, febrero y marzo llega a 21°C y en Junio Julio y agosto baja a casi 17°C. Si
Al conocer datos relevantes sobre lo que hablaremos en el presente informe podemos plantear
nuestro objetivo.
“Sistema de Alcantarillado centro poblado Menor de San Francisco” del cual realizaremos un
Concluimos en que el proyecto cumplirá con la satisfacción de los habitantes del C.P San
Francisco y a su vez una buena mejora cumpliendo aspectos importantes para el proyecto.
9
CONTENIDO
CAPÍTULO 1: METRADOS
ESPECIFICACIONES TECNICAS
Según todos los datos que muestra el proyecto “Mejoramiento del Sistema de Agua
nuestro equipo nos tocó metrar el concepto de “Sistema de Alcantarillado centro Poblado
La topografía del terreno consta de sub áreas de drenaje con descargas a buzones de
colectores proyectados y los existentes, todo eso se puede corroborar en los planos del
proyecto el cual está dividido por avenidas o pasajes, los buzones, buzonetas estas se
10
Para la recolecta de estos desagües se diseñaron colectores de 160 y 200 mm de diámetro
Las partidas o Ítem usados son de acuerdo a lo establecido ya en el expediente, fue nuestra
guía base para partir a metrar y dichas partidas son las siguientes:
11
01.00.00. OBRAS PROVISIONALES
forma inmediata y transitoria, para el buen control y seguridad de todos los elementos que
de área construida de triplay con marcos de madera y techos de calamina que serán
destinados para los ambientes de oficina de residencia, almacén y guardianía, para dar
continuo desarrollo.
12
01.03.00 CERCO DE ESTERAS
SEGURIDAD DE OBRA.
S/D
Se colocará cos de fibra de vidrio fosforescente en tramaos donde este se necesite con la
finalidad de que los vehículos prevengan en que la zona se está realizando trabajos y de esta
En esta partida se considera puentes de madera con la finalidad de dar paso a los transeúntes
residentes de la zona, la colocación de estos puentes será a criterio del ingeniero residente.
medida de todos los elementos y niveles indicados en los planos. Comprende el replanteo de
los planos en el terreno y nivelado fijando los ejes de referencia con equipo topográfico y las
estacas de nivelación. Se marcarán los ejes y a continuación se marcará las líneas del
alineamiento de la estructura a instalarse en armonía con los planos, estos ejes deberán ser
revisados por el Residente de Obra y aprobados por el Supervisor, antes del inicio de los
trabajos.
14
La unidad de medición a que se refiere esta partida es el metro lineal (ml).
OBRA
Comprende el replanteo de los planos en el terreno y nivelado fijando los ejes de referencia
con equipo topográfico y las estacas de nivelación durante la construcción. Se marcarán los
armonía con los planos, estos ejes deberán ser revisados por el Residente de Obra y
DENSIDAD DE CAMPO)
METODO DE MEDICION: La medición de la partida antes señalada será por unidad (und).
que sean necesarios al lugar en que desarrollará la obra antes de iniciar y al finalizar los
A 1000 m s. n. m., en la llanura costera, están las pampas, cerros y colinas, quebradassecas,
estrechos valles, médanos, así como las lomas de Atiquipa, Lomas, Atico y Pescadores. Es
Como método constructivo, las zanjas podrán hacerse con las paredes verticales si la calidad
el terreno lo permitiera o si no, se les darán los taludes adecuados según la naturaleza del
mismo, la excavación de la zanja tendrá una sección mínima de 0,60 metros de ancho y hasta
La profundidad mínima de excavación para la colocación de las tuberías será tal que se tenga
un enterramiento mínimo de 1.20 mt. Sobre los empalmes, solo en el caso de pasajes
peatonales y/o calles angostas hasta 3.00 mts. de ancho, en donde no existe circulación de
17
tránsito vehicular se permitirá un recubrimiento mínimo de 0.60 mts. en cualquier otro punto
El fondo de toda excavación debe quedar limpio y parejo, se deberá retirar el material suelto,
se permitirá el relleno con material suelto, lo deberá hacer con una mezcla de concreto
18
03.01.08 REFINE Y NIV. DE ZANJAS T. NORMAL P/TUB. D = 4"-6"
manuales.
buzones.
19
03.01.10 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 1.5 D = 4"-6" INC.
C/ARENA
03.01.11 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.0 D = 4"-6" INC.
C/ARENA
03.01.12 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 1.5 D = 8"-10" INC.
C/ARENA
03.01.13 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.0 D = 8"-10" INC.
C/ARENA
03.01.14 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.5 D = 8"-10" INC.
C/ARENA
Materiales.
- Agua
Equipos
Método constructivo
prueba hidráulica.
20
- El Relleno Final completa la operación de relleno con material préstamo debidamente
seleccionado, que no contengan piedras grandes y/o cortantes. Puede ser colocado con
maquinaria y extendido proporcionalmente. Este relleno final se hará hasta el nivel natural
del terreno.
grado de compactación del terreno natural) y tendrán un espesor menor de 20 cms, en todo
Unidad ml 2373.28
Unidad ml 1538.21
Unidad ml 388.98
Esta partida comprende la eliminación del material excedente determinado después de haber
eliminación de desperdicios de obra como son residuos de mezclas, ladrillos y basuras, etc.,
El trabajo realizado se medirá en metros cúbicos (m3) del material acarreado y aprobado por
esponjamiento del material multiplicado por la diferencia entre el volumen del material
la obra. Así como la eliminación de desperdicios de obra como son residuos de mezclas,
El trabajo realizado se medirá en metros cúbicos (m3) del material acarreado y aprobado por
esponjamiento del material multiplicado por la diferencia entre el volumen del material
22
03.02.00 SUMINISTRO E INSTALACION DE TUBERIA
SISTEMA DE ALCANTARILLADO
Tuberías PVC ISO de Diámetros 160, 200, 250 mm Clase S-25 U.F. con sus respectivos
S-20: para uso en zonas donde el peso volumétrico del relleno sea igual o mayor a 2,000
kg/m3.
Unidad m1 2 373.28
Unidad m1 388.98
MATERIALES
• Agua
MÉTODO CONSTRUCTIVO
Se realiza con agua y enrasando la superficie libre del líquido con la parte superior del buzón,
aguas arriba del tramo en prueba, y taponando la tubería de salida en el buzón aguas abajo.
Esta prueba permite detectar las fugas en las uniones o en el nivel de agua del buzón en
Ve = 0,0047 Di x L
Donde:
24
03.03.00 BUZONES
METODO DE MEDICIÓN
El trabajo realizado se medirá en metros cúbicos (m3) del material demolido y luego trasladado.
MATERIALES
• Arena fina
• Arena gruesa
• Piedra chancada ½” @ ¾”
• Agua
25
• Fierro corrugado de 1/2"
• Alambre negro N° 16
SEGURIDAD S/ESPECIFICACION
EQUIPOS
• Herramientas manuales
MÉTODO CONSTRUCTIVO
El primer trabajo debe ser la construcción de los buzones que serán los que determinen la
nivelación y alineamiento de la tubería. Se dejarán las aberturas para recibir las tuberías de
Los buzones serán del tipo 1, con 1.20 m. de diámetro interior terminado, construidos con
concreto simple f’c = 140 Kg/cm2 para el fondo de buzón de un espesor de 20 cm. Los muros
26
serán de concreto f’c = 175 kg/cm2 y de 20 cm de espesor, los anclajes al buzón serán de
f’c=140 kg/cm2.
En los suelos saturados de agua o en los que a juicio del Ingeniero Inspector sea necesario,
el fondo será de concreto armado f´c = 175 Kg/cm2 de 0.30 m. de espesor, así como los
muros.
El techo será de concreto armado fc = 210 Kg/cm2, y con los refuerzos necesarios en la boca
de ingreso.
El agregado fino a utilizar será de arena o piedra natural finamente triturada de dimensiones
reducidas y que pasen como mínimo el 95 % el tamiz 4.76 mm (N° 4) quedando retenido
como mínimo el 90 % en el tamiz N° 100. El porcentaje retenido entre dos mallas sucesivas
El agregado grueso debe ser de grava o piedra chancada denominándose así cuando estos
concreto de f’c=140 kg/cm2 de un ancho de 30 cm. como mínimo y 15 cm. fuera de la clave
del tubo.
Finalmente se procederá con la eliminación del material demolido, excedente para dar las
27
BUZON TIPO I T.N. HASTA 1.50 m
Descripción Cantidad N° de veces Largo (m) Ancho (m) Altura (m) Total
BUZON TIPO II T. N.
37.00 1 1 1 1 37
HASTA 5.00 m
Unidad und 37
28
03.03.06 PERFORACIÓN DE FUSTE BUZON EXISTENTE PARA EMPALME Y
DADO DE ANCLAJE
MATERIALES
• Agua
• Madera tornillo
EQUIPOS
• Herramientas manuales
MÉTODO CONSTRUCTIVO
El Agua a ser usada en la preparación del concreto deberá ser de agua dulce limpia, que no
contenga soluciones químicas u otros agentes que puedan ser perjudiciales al fraguado o a la
resistencia.
concreto de f’c=140 kg/cm2 de un ancho de 30 cm. como mínimo y 15 cm. fuera de la clave
del tubo.
Finalmente se procederá con la eliminación del material demolido, excedente para dar las
MATERIALES
• Abrazaderas de Aluminio
• Tubería PVC
• Tee PVC
• Codo PVC
• Tapón PVC
MÉTODO CONSTRUCTIVO
En las cámaras de inspección en que las tuberías no lleguen al mismo nivel, se proyectara un
dispositivo de caída cuando la altura de descarga o caída con respecto al fondo de la cámara
sea mayor a 1 metro. Teniendo en cuenta los accesorios y tuberías indicadas en los planos
30
03.04 CONEXIONES DOMICILIARIAS
MATERIALES
• Arena fina.
• Arena gruesa
• Yeso en bolsas de 20 kg
• Gasolina 84 octanos
• Tubería pvc-iso 160mm s-25 u.f. similar y/o igual a marca AMANCO.
• Codo cachimba 45º pvc d=160 mm u.f. similar y/o igual a marca AMANCO.
• Silla tee pvc p/conexión de desagüe 160 mm x 160 mm similar y/o igual a marca
AMANCO.
• Silla tee pvc p/conexión de desagüe 200 mm x 160 mm similar y/o igual a marca
AMANCO.
31
• Silla tee pvc p/conexión de desagüe 250 mm x 160 mm similar y/o igual a marca
AMANCO.
EQUIPOS
• Herramientas manuales
MÉTODO CONSTRUCTIVO
trazo y perforación del colector, (orificio de 0.15 m de diámetro), con la ayuda de una hoja
de sierra, luego se aplicara pegamento PVC en ambas superficies, (lomo de colector y cara
con dos amarres de alambre N.º 08. El resto de la conexión se ejecutará siguiendo los
La ubicación del codo de 45º dependerá de la profundidad del colector, es por ello que este
Esta capa tendrá 20 cms. compuesto de grava o piedra fracturado en formas naturales o
Esta capa tiene por finalidad absorber los esfuerzos transmitidos por la carga de los vehículos
NORMA DE MEDICION
superficies adicionales correspondientes a los empalmes con las vías existentes, se medirán
por separado, calculando el área en función de su forma. Se debe tener en cuenta el espesor
Este trabajo se refiere al suministro y aplicación de material bituminoso a una base flexible
preparada con anterioridad, para impermeabilizar de acuerdo con las presentes especificaciones,
MATERIALES
a) Asfalto líquido de rápido curado (RC-CUT-Backs) del tipo RC-2 (RC-250), de acuerdo a los
EQUIPO
33
El equipo para la colocación de la copa de imprimación debe incluir una cocina asfáltica que
tengo, una unidad calentadora para el material y un distribuidor a Presión (Tanque Imprimador).
NORMA DE MEDICION
El área de la superficie se obtiene multiplicando el ancho del imprimado por la longitud. Las
superficies adicionales correspondientes a los empalmes con las vías existentes, se medirán por
Los paños de pavimento deberán ser de sección rectangular y los bordes serán perfectamente
La reposición de pavimento se hará de acuerdo con los reglamentos pertinentes para cada clase
En las calles con pavimento el ejecutor mantendrá la superficie del relleno a nivel de la calle
Todos los materiales que debe reponer el ejecutor por insuficiencia o deficiencia de los que hayan
sido extraídos de las calzadas deben ser de igual naturaleza, clase y composición que los
34
NORMA DE MEDICION
04.00 VARIOS
NORMA DE MEDICION
Será estimado en ancho por el largo total y se limpiaran todas las calles donde se realizaron
los trabajos.
35
CAPÍTULO 2: ANÁLISIS DE PRECIOS UNITARIOS
36
SUSTENTO DE COSTO H/H DE OPERARIO OFICIAL
37
SUSTENTO DE COSTO H/H DE TOPOGRAFO
38
ANEXO
• APU’s
Tomamos en cuenta la estructura del proyecto similar al nuestro, con la diferencia que
actualizaremos los precios de mano de obra, los materiales con sus precios actuales a la
39
40
41
42
43
• PRECIOS
44
45
46
47
48
49
50
CONCLUSIONES:
• Los metrados nos ayudan a enlistar los trabajos de una obra y para que sea más fácil
y más preciso al momento de realizar el presupuesto.
• También se concluye que cada partida es un paso de la obra, todo lleva relación por
lo tanto es necesario conocer e informarse en libros, trabajos realizados, experiencia
de docentes o más.
• En conclusión, mientras más preciso sea nuestro metrado, tendremos mayor precisión
al momento del cálculo de materiales y la elaboración de un futuro presupuesto.
• Concluimos acerca del avance del trabajo de metrados cuantificamos buzón por buzón y
buzonetas, enlistando sus cotas, distancias, diámetros y pendientes. Con estos datos
esenciales haremos los metrados de excavación, relleno y eliminación.
51
REFERENCIAS:
Moquegua.
• https://www.youtube.com/watch?v=3Lto0BvgLno
• https://www.studocu.com/pe/document/servicio-nacional-de-capacitacion-para-la-
industria-de-la-construccion/construccion/suplemento-tecnico-316-marzo-
2022/26682351
ANEXO 1
ANCH LARG PARCIA
ITEM DESCRIPCION UND # O O L TOTAL
01.00.00 OBRAS PROVICIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X
01.01.00 7.20 M u 1 1 1
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
01.02.00 m² 45
01.02.01 ALMACEN m² 1 6 4 24
01.02.02 OFICINA m² 1 4 4 16
01.02.03 CASETA DE GUARDIANIA m² 1 2 2.5 5
01.03.00 CERCO DE ESTERA m 1 50 50
CINTA PLASTICA SEÑALIZADORA PARA LIMITE DE
01.04.00 SEGURIDAD m 1 1000 1000
CERCO DE MALLA ANARANJADA DE 1 m ALTURA
PARA LIMITE DE SEGURIDAD DE OBRA
01.05.00 m 1 1000 1000
CONO FIBRA DE VIDRIO FOSFORESCENTE P/DESVIO
DE TRANSITO S/D
01.06.00 u 10 10
PUENTE DE MADERA PARA PASE PEATONAL SOBRE
ZANJA S/D
01.07.00 u 20 20
02.00.00 OBRAS PRELIMINARES
02.01.00 TRAZO Y REPLANTEO C/EQUIPO m 12438.7
AV. ALFONSO UGARTE m 1 740.5
PSJE. RIMAC m 1 23.06
PSJE. LOS GERANEOS m 1 30.75
PSJE. UCAYALI m 1 37.98
PSJE. LOS JAZMINES m 1 102.1
PSJE. MARAÑON m 1 56.66
PSJE. CHILI m 1 45.4
PSJE SAN FELIPE m 1 103.1
PSJE LA MERCED m 1 35.59
PSJE. SAN JOSE m 1 38.74
PSJE. SANTA FORTUNATA m 1 21.15
PSJE SAN PEDRO m 1 47.38
PSJE. SAN JUAN m 1 164.6
PSJE SAN VALENTIN m 1 31.1
PSJE. SAN BERNAVE m 1 36.32
CALLE 9 DE OCTUBRE m 1 74.18
CALLE 28 DE JULIO m 1 1254
CALLE SANCHEZ CERRO m 1 290.8
CALLE PIEROLA m 1 188.2
CALLE V" m 1 27.76
PROLONGACION CALLE NUEVA m 1 460.2
CALLE 10 m 1 135.2
CALLE 10 DE ENERO m 1 101.9
CALLE LOS CIPRECES m 1 86.65
CALLE LOS PINOS m 1 81.9
CALLE 30 DE AGOSTO m 1 55.41
CALLE LOS CEDROS m 1 39.54
CALLE LOS ROBLES m 1 61.57
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ANEXO 1
CALLE 9 DE OCTUBRE m 1 273.4
CALLE BUENOS AIRES m 1 290.5
CALLE 12 DE OCTUBRE m 1 222.9
CALLE SANTA ROSA m 1 227.4
CALLE CALAMAZO m 1 341
CALLE SAN ISIDRO m 1 327.7
PSJE. PRECURSORES m 1 98.64
CALLE HIPOLITO INANUE m 1 133.1
CALLE MANUEL CAMINO DE LA TORRE m 1 57.14
CALLE BOLOGNESI m 1 95.18
PSJE. INDEPENDECIA m 1 79.12
CALLE SUCRE m 1 111.3
CALLE VELLAVISTA m 1 60.39
PSJE JERUSALEN m 1 49.82
PSJE. AVELINO CACERES m 1 37.11
CALLE MARIANO MELGAR m 1 140.2
CALLE MIRAFLORE m 1 177
PSJE MARISCAL m 1 29.9
CALLE RAMON CASTILLA m 1 406.3
CALLE DOMINGO NIETO m 1 473.8
CALLE ARICA m 1 255.4
CALLE JORGE CHAVEZ m 1 630.9
PSJE SAN ANTONIO m 1 42.77
CALLE LEONCIO PRADO m 1 148.4
CALLE GRAU m 1 89.22
CALLE DANIEL BECERRA OCAMPO m 1 169.9
CALLE JOSE CARLOS MARIATEGUI m 1 424.8
CALLE SAN MARTIN m 1 497.7
PSJE SIN NOMBRE(BZTA-81-BZTA-78) m 1 147.4
CALLE 2 DE MAYO m 1 413.5
PSJE SIN NOMBRE m 1 623.2
PSJE MOLLENDO m 1 42.89
PSJE VALLECITO m 1 160
PSJE SIN NOMBRE(BZTA-19-B-E) m 1 69.85
CALLE VICTORIA m 1 30.34
PASAJE LOS MARTIRES m 1 91.99
CALLE HUSARES m 1 26.89
CALLE LOS HEROHES m 1 33.26
PROLONGACION JORGE CHAVEZ m 1 135.2
CALLE LOS CRISANTEMOS m 1 39.93
PSJE C Y R m 1 149
PSJE HUAYLAS m 1 101.2
TRAMO ( BZTA-8, BZTA -6) m 1 81.9
PSJE D m 1 30.04
TRAZO Y REPLANTEO C/EQUIPO DURANTE LA
EJECUCION DE LA OBRA
02.02.00 m 12438.7
AV. ALFONSO UGARTE m 1 740.5
PSJE. RIMAC m 1 23.06
PSJE. LOS GERANEOS m 1 30.75
PSJE. UCAYALI m 1 37.98
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ANEXO 1
PSJE. LOS JAZMINES m 1 102.1
PSJE. MARAÑON m 1 56.66
PSJE. CHILI m 1 45.4
PSJE SAN FELIPE m 1 103.1
PSJE LA MERCED m 1 35.59
PSJE. SAN JOSE m 1 38.74
PSJE. SANTA FORTUNATA m 1 21.15
PSJE SAN PEDRO m 1 47.38
PSJE. SAN JUAN m 1 164.6
PSJE SAN VALENTIN m 1 31.1
PSJE. SAN BERNAVE m 1 36.32
CALLE 9 DE OCTUBRE m 1 74.18
CALLE 28 DE JULIO m 1 1254
CALLE SANCHEZ CERRO m 1 290.8
CALLE PIEROLA m 1 188.2
CALLE V" m 1 27.76
PROLONGACION CALLE NUEVA m 1 460.2
CALLE 10 m 1 135.2
CALLE 10 DE ENERO m 1 101.9
CALLE LOS CIPRECES m 1 86.65
CALLE LOS PINOS m 1 81.9
CALLE 30 DE AGOSTO m 1 55.41
CALLE LOS CEDROS m 1 39.54
CALLE LOS ROBLES m 1 61.57
CALLE 9 DE OCTUBRE m 1 273.4
CALLE BUENOS AIRES m 1 290.5
CALLE 12 DE OCTUBRE m 1 222.9
CALLE SANTA ROSA m 1 227.4
CALLE CALAMAZO m 1 341
CALLE SAN ISIDRO m 1 327.7
PSJE. PRECURSORES m 1 98.64
CALLE HIPOLITO INANUE m 1 133.1
CALLE MANUEL CAMINO DE LA TORRE m 1 57.14
CALLE BOLOGNESI m 1 95.18
PSJE. INDEPENDECIA m 1 79.12
CALLE SUCRE m 1 111.3
CALLE VELLAVISTA m 1 60.39
PSJE JERUSALEN m 1 49.82
PSJE. AVELINO CACERES m 1 37.11
CALLE MARIANO MELGAR m 1 140.2
CALLE MIRAFLORE m 1 177
PSJE MARISCAL m 1 29.9
CALLE RAMON CASTILLA m 1 406.3
CALLE DOMINGO NIETO m 1 473.8
CALLE ARICA m 1 255.4
CALLE JORGE CHAVEZ m 1 630.9
PSJE SAN ANTONIO m 1 42.77
CALLE LEONCIO PRADO m 1 148.4
CALLE GRAU m 1 89.22
CALLE DANIEL BECERRA OCAMPO m 1 169.9
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ANEXO 1
CALLE JOSE CARLOS MARIATEGUI m 1 424.8
CALLE SAN MARTIN m 1 497.7
PSJE SIN NOMBRE(BZTA-81-BZTA-78) m 1 147.4
CALLE 2 DE MAYO m 1 413.5
PSJE SIN NOMBRE m 1 623.2
PSJE MOLLENDO m 1 42.89
PSJE VALLECITO m 1 160
PSJE SIN NOMBRE(BZTA-19-B-E) m 1 69.85
CALLE VICTORIA m 1 30.34
PASAJE LOS MARTIRES m 1 91.99
CALLE HUSARES m 1 26.89
CALLE LOS HEROHES m 1 33.26
PROLONGACION JORGE CHAVEZ m 1 135.2
CALLE LOS CRISANTEMOS m 1 39.93
PSJE C Y R m 1 149
PSJE HUAYLAS m 1 101.2
TRAMO ( BZTA-8, BZTA -6) m 1 81.9
PSJE D m 1 30.04
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ANEXO 2
EXCAV. A MANO T. N. HASTA 1.00 P/TUB. D = 4 - 6"
Descripción Cantidad N° de veces Largo (m) Ancho (m) Altura (m) Total
EXCAV. A
MANO T. N. 1.00 1 1398.73 1 1 1398.73
HASTA 1.00
Unidad ml 1398.73
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ANEXO 2
REFINE Y NIV. DE ZANJAS T. NORMAL P/TUB. D = 4"-6"
Descripción Cantidad N° de veces Largo (m) Ancho (m) Altura (m) Total
REFINE Y
NIV. DE 1.00 1 2762.26 1 1 2762.26
ZANJAS
Unidad ml 2762.26
REFINE Y NIV. DE ZANJAS T. NORMAL P/TUB. D = 8"-10"
Descripción Cantidad N° de veces Largo (m) Ancho (m) Altura (m) Total
REFINE Y
NIV. DE 1.00 1 9719.56 1 1 9719.56
ZANJAS
Unidad ml 9719.56
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ANEXO 3
Factor de
Descripción Cantidad N° de veces Largo (m) Altura (m) Total
Compactación
RELLENO CON
MATERIAL 1.00 1.00 2373.28 1.50 0.90 2373.28
PROPIO
H=1.50
Unidad ml 2373.28
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ANEXO 4
SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 160 MM S-25 U.F.
Descripción Cantidad N° de veces Largo (m) Ancho (m) Altura (m) Total
Unidad m1 2 373.28
Unidad m1 388.98
Unidad m1 1 538.21
Unidad m1 5 991.16
Unidad m1 2 190.19
Unidad m1 334.33
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ANEXO 4
BUZON TIPO I T.N. HASTA 2.00 m
Descripción Cantidad N° de veces Largo (m) Ancho (m) Altura (m) Total
BUZON TIPO II T. N.
37.00 1 1 1 1 37
HASTA 5.00 m
Unidad und 37
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
S10 Página 1
Presupuesto
Presupuesto 1401001 AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL
DISTRITO DE MOQUEGUA
Subpresupuesto 001 AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL
DISTRITO DE MOQUEGUA
Cliente MUNICIPALIDAD PROVINCIAL MARISCAL NIETO Costo al 17/11/2022
Lugar MOQUEGUA - MARISCAL NIETO - MOQUEGUA
Presupuesto
Presupuesto 1401001 AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL
DISTRITO DE MOQUEGUA
Subpresupuesto 001 AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL
DISTRITO DE MOQUEGUA
Cliente MUNICIPALIDAD PROVINCIAL MARISCAL NIETO Costo al 17/11/2022
Lugar MOQUEGUA - MARISCAL NIETO - MOQUEGUA
03.03.08 DISPOSITIVO DE CAIDA DENTRO DE BUZON D=200MM und 6.00 1,896.01 11,376.06
03.03.09 DISPOSITIVO DE CAIDA DENTRO DE BUZON D=250MM und 1.00 3,788.77 3,788.77
03.04 CONEXIONES DOMICILIARIAS 930,010.51
03.04.01 CONEXION DOMICILIARIA CON SILLA TEE PVC D=160MMX160MM und 369.00 784.78 289,583.82
03.04.02 CONEXION DOMICILIARIA CON SILLA TEE PVC D=200MMX160MM und 931.00 503.59 468,842.29
03.04.03 CONEXION DOMICILIARIA CON SILLA TEE PVC D=250MMX160MM und 340.00 504.66 171,584.40
03.05 PAVIMENTO ASFALTICO 334,189.75
03.05.01 BASE GRANULAR E=0.20 m m2 5,009.59 17.63 88,319.07
03.05.02 IMPRIMADO DE CARPETA ASFALTICA m2 5,009.59 16.32 81,756.51
03.05.03 REPOSICION DE CARPETA ASFALTICA E=2" m2 5,009.59 32.76 164,114.17
04 VARIOS 16,074.46
04.01 LIMPIEZA FINAL DE OBRA m2 7,176.10 2.24 16,074.46
COSTO DIRECTO 6,311,947.37
UTILIDAD 7% 441,836.32
-------------------------------------
SUBTOTAL 7,258,739.48
SON : SEIS MILLONES TRESCIENTOS ONCE MIL NOVECIENTOS CUARENTISIETE Y 37/100 SOLES
Presupuesto 1401001 AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL DISTRITO DE MOQUEGUA
Subpresupuesto 001 AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL DISTRITO DE MOQUEGUA Fecha presupuesto 17/11/2022
Partida 01.01 CARTEL DE IDENTIFICACIÓN DE LA OBRA DE 3.60X2.40M
Rendimiento und/DIA 0.7000 EQ. 0.7000 Costo unitario directo por : und 1,266.08
826.78
Materiales
02041200010009 CLAVOS PARA MADERA CON CABEZA TAMAÑO PROMEDIOkg 0.3000 6.78 2.03
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0750 27.00 2.03
325.90
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 826.78 41.34
113.40
Rendimiento m2/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m2 69.13
17.44
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.0050 4.46 0.02
02041200010009 CLAVOS PARA MADERA CON CABEZA TAMAÑO PROMEDIOkg 0.0750 6.78 0.51
51.17
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 17.44 0.52
0.52
Rendimiento m/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m 25.48
8.88
Materiales
02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0800 4.46 0.36
16.33
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 8.88 0.27
0.27
Rendimiento m/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : m 5.51
1.36
Materiales
0207030001 HORMIGON m3 0.0010 50.00 0.05
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0060 27.00 0.16
4.11
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.36 0.04
0.04
Partida 01.05 CERCO DE MALLA ANARANJADA DE 1M DE ALTURA PARA LIMITE DE SEGURIDAD DE OBRA
Rendimiento m/DIA 240.0000 EQ. 240.0000 Costo unitario directo por : m 3.49
1.59
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.0010 95.00 0.10
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0030 27.00 0.08
1.82
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 1.59 0.08
0.08
Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 58.82
58.82
Partida 01.07 PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D
Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 58.82
58.82
Rendimiento m/DIA 800.0000 EQ. 800.0000 Costo unitario directo por : m 1.31
0.86
Materiales
0231010001 MADERA TORNILLO p2 0.0275 6.50 0.18
0.26
Equipos
03010000020001 NIVEL hm 1.0000 0.0100 7.50 0.08
0.19
Rendimiento m/DIA 800.0000 EQ. 800.0000 Costo unitario directo por : m 1.31
0.86
Materiales
0231010001 MADERA TORNILLO p2 0.0275 6.50 0.18
0.26
Equipos
03010000020001 NIVEL hm 1.0000 0.0100 7.50 0.08
0.19
Rendimiento m2/DIA 50.0000 EQ. 50.0000 Costo unitario directo por : m2 7.92
6.78
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 6.78 0.20
0301110002 CORTADORA DE PAVIMENTO CON DISCO DE CORTE hm 1.0000 0.1600 5.88 0.94
1.14
Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 126.05
126.05
Rendimiento glb/DIA 36.0000 EQ. 36.0000 Costo unitario directo por : glb 840.34
840.34
Rendimiento m/DIA 7.0000 EQ. 7.0000 Costo unitario directo por : m 25.63
24.88
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 24.88 0.75
0.75
Partida 03.01.02 EXCAV. A MANO T.N. HASTA 1.50 P/TUB. D=4-6"
Rendimiento m/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : m 44.86
43.55
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 43.55 1.31
1.31
Partida 03.01.03 EXCAV. C/I A MAQ. T.N. HASTA 1.50 P/TUB. D=4-6"
Rendimiento m/DIA 277.0000 EQ. 277.0000 Costo unitario directo por : m 6.01
1.93
Materiales
0201040001 PETROLEO D-2 gal 0.1000 19.61 1.96
1.96
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.93 0.06
2.12
Partida 03.01.04 EXCAV. C/I A MAQ. T.N. HASTA 2.00 P/TUB. D=4-6"
Rendimiento m/DIA 208.0000 EQ. 208.0000 Costo unitario directo por : m 7.94
2.56
Materiales
0201040001 PETROLEO D-2 gal 0.1300 19.61 2.55
2.55
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.56 0.08
2.83
Partida 03.01.05 EXCAV. C/I A MAQ. T.N. HASTA 1.50 P/TUB. D=8-10"
Rendimiento m/DIA 112.3800 EQ. 112.3800 Costo unitario directo por : m 11.92
Materiales
0201040001 PETROLEO D-2 gal 0.1000 19.61 1.96
1.96
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.73 0.14
5.23
Partida 03.01.06 EXCAV. C/I A MAQ. T.N. HASTA 2.00 P/TUB. D=8-10"
Rendimiento m/DIA 178.0000 EQ. 178.0000 Costo unitario directo por : m 8.92
2.99
Materiales
0201040001 PETROLEO D-2 gal 0.1340 19.61 2.63
2.63
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.99 0.09
3.30
Partida 03.01.07 EXCAV. C/I A MAQ. T.N. HASTA 2.50 P/TUB. D=8-10"
Rendimiento m/DIA 130.0000 EQ. 130.0000 Costo unitario directo por : m 12.21
4.09
Materiales
0201040001 PETROLEO D-2 gal 0.1840 19.61 3.61
3.61
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.09 0.12
4.51
Rendimiento m/DIA 70.0000 EQ. 70.0000 Costo unitario directo por : m 2.56
2.49
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.49 0.07
0.07
Rendimiento m/DIA 37.0000 EQ. 37.0000 Costo unitario directo por : m 4.85
4.71
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.71 0.14
0.14
Partida 03.01.10 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 1.5 D=4-6" INC. C/ARENA
Rendimiento m/DIA 120.0900 EQ. 120.0900 Costo unitario directo por : m 48.72
41.29
Materiales
02010300010001 GASOLINA 84 gal 0.0110 16.94 0.19
5.18
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 41.29 1.24
2.25
Partida 03.01.11 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.0 D=4-6" INC. C/ARENA
Rendimiento m/DIA 75.0000 EQ. 75.0000 Costo unitario directo por : m 73.46
64.15
Materiales
02010300010001 GASOLINA 84 gal 0.0180 16.94 0.30
5.78
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 64.15 1.92
Partida 03.01.12 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 1.5 D=8-10" INC. C/ARENA
Rendimiento m/DIA 103.0000 EQ. 103.0000 Costo unitario directo por : m 50.67
42.37
Materiales
02010300010001 GASOLINA 84 gal 0.0120 16.94 0.20
5.85
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 42.37 1.27
2.45
Partida 03.01.13 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.0 D=8-10" INC. C/ARENA
Rendimiento m/DIA 64.2800 EQ. 64.2800 Costo unitario directo por : m 78.26
67.87
Materiales
02010300010001 GASOLINA 84 gal 0.0190 16.94 0.32
6.47
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 67.87 2.04
3.92
Partida 03.01.14 RELLENO COMPAC. ZANJA T.N. P/TUB. HASTA 2.5 D=8-10" INC. C/ARENA
Rendimiento m/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m 122.07
109.08
Materiales
02010300010001 GASOLINA 84 gal 0.0320 16.94 0.54
6.69
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 109.08 3.27
6.30
Rendimiento m3/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m3 18.28
17.41
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 17.41 0.87
0.87
Rendimiento m3/DIA 867.0000 EQ. 867.0000 Costo unitario directo por : m3 2.31
0.42
Materiales
0201040001 PETROLEO D-2 gal 0.0368 19.61 0.72
0.72
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 0.42 0.01
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 1.0000 0.0092 126.05 1.16
1.17
Rendimiento m3/DIA 800.0000 EQ. 800.0000 Costo unitario directo por : m3 5.80
0.54
Materiales
0201040001 PETROLEO D-2 gal 0.1128 19.61 2.21
2.21
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 0.54 0.02
03012200040002 CAMION VOLQUETE DE 10 m3 hm 4.0000 0.0400 75.63 3.03
3.05
Rendimiento m/DIA 450.0000 EQ. 450.0000 Costo unitario directo por : m 205.88
1.19
Materiales
02050700020024 TUBERIA PVC-ISO 250 MM S-25 UF und 1.0200 119.76 122.16
204.65
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.19 0.04
0.04
Rendimiento m/DIA 347.0000 EQ. 347.0000 Costo unitario directo por : m 25.81
2.17
Materiales
0215010002 TUBERIA ALCANTARILLADO UFS-25 160 mm (6") INC. ANILLOm 1.0200 22.78 23.24
23.57
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.17 0.07
0.07
Rendimiento m/DIA 347.0000 EQ. 347.0000 Costo unitario directo por : m 42.14
2.17
Materiales
0215010003 TUBERIA ALCANTARILLADO UFS-20 160 mm (6") INC. ANILLOm 1.0200 38.79 39.57
39.90
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.17 0.07
0.07
Rendimiento m/DIA 290.0000 EQ. 290.0000 Costo unitario directo por : m 30.70
2.61
Materiales
0215010004 TUBERIA ALCANTARILLADO UFS-25 200 mm (8") INC. ANILLOm 1.0200 27.07 27.61
28.01
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.61 0.08
0.08
Rendimiento m/DIA 290.0000 EQ. 290.0000 Costo unitario directo por : m 46.56
2.61
Materiales
0215010005 TUBERIA ALCANTARILLADO UFS-20 200 mm (8") INC. ANILLOm 1.0200 42.62 43.47
43.87
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.61 0.08
0.08
Rendimiento m/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : m 67.56
3.03
Materiales
0215010006 TUBERIA ALCANTARILLADO UFS-25 250 mm (10") INC. ANILLO
m 1.0200 62.78 64.04
64.44
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.03 0.09
0.09
Partida 03.02.07 SUMINISTRO E INSTALACIÓN DE TUBERÍA PCV-ISO 250MM S-20 U.F.
Rendimiento m/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : m 46.99
3.03
Materiales
0215010007 TUBERIA ALCANTARILLADO UFS-20 250 mm (10") INC. ANILLO
m 1.0200 42.62 43.47
43.87
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.03 0.09
0.09
Rendimiento m/DIA 400.0000 EQ. 400.0000 Costo unitario directo por : m 2.50
1.33
Materiales
0207030001 HORMIGON m3 0.0010 50.00 0.05
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0200 27.00 0.54
1.13
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.33 0.04
0.04
Rendimiento m3/DIA 6.0000 EQ. 6.0000 Costo unitario directo por : m3 266.66
58.06
Materiales
0201040001 PETROLEO D-2 gal 4.8000 19.61 94.13
94.13
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 58.06 1.74
03011400060003 COMPRESORA NEUMATICA 250 - 330 PCM - 87 HP hm 1.0000 1.3333 58.99 78.65
114.47
Rendimiento und/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : und 1,313.40
311.31
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.3200 4.46 1.43
02041200010009 CLAVOS PARA MADERA CON CABEZA TAMAÑO PROMEDIOkg 0.8210 6.78 5.57
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 10.0000 27.00 270.00
0219090002 TAPA DE FIERRO FUNDIDO PARA BUZON DE 0.60 m und 1.0000 319.33 319.33
982.94
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 311.31 9.34
19.15
Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 3,731.63
1,990.44
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.9620 4.46 4.29
02041200010009 CLAVOS PARA MADERA CON CABEZA TAMAÑO PROMEDIOkg 0.8210 6.78 5.57
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 22.8300 27.00 616.41
0219090002 TAPA DE FIERRO FUNDIDO PARA BUZON DE 0.60 m und 1.0000 319.33 319.33
1,611.98
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1,990.44 59.71
0301330008 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" und 0.7200 42.02 30.25
129.21
Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 4,340.25
2,437.56
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.9620 4.46 4.29
02041200010009 CLAVOS PARA MADERA CON CABEZA TAMAÑO PROMEDIOkg 0.8210 6.78 5.57
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 26.3180 27.00 710.59
0219090002 TAPA DE FIERRO FUNDIDO PARA BUZON DE 0.60 m und 1.0000 319.33 319.33
1,776.75
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 2.0000 2,437.56 48.75
0301330008 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" und 0.7200 42.02 30.25
125.94
Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 9,073.73
2,609.92
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 4.6720 4.46 20.84
02041200010009 CLAVOS PARA MADERA CON CABEZA TAMAÑO PROMEDIOkg 6.3660 6.78 43.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 81.9160 27.00 2,211.73
0219090002 TAPA DE FIERRO FUNDIDO PARA BUZON DE 0.60 m und 1.0000 319.33 319.33
5,904.48
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 2.0000 2,609.92 52.20
0301330008 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" und 7.7520 42.02 325.74
559.33
Partida 03.03.06 PERFORACION DE FUSTE BUZON EXISTENTE PARA EMPALME Y DADO DE ANCLAJE
Rendimiento und/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : und 225.24
139.01
Materiales
0207030001 HORMIGON m3 0.0600 50.00 3.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.2500 27.00 6.75
22.91
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 139.01 6.95
03011400060003 COMPRESORA NEUMATICA 250 - 330 PCM - 87 HP hm 1.0000 0.6667 58.99 39.33
63.32
Rendimiento und/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : und 1,120.47
38.36
Materiales
0204240030 ABRAZADERA DE ALUMINIO und 2.0000 2.60 5.20
02051000020007 CODO PVC ISO 160 mm x90º und 1.0000 278.25 278.25
1,029.31
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 38.36 1.15
1.15
Subcontratos
04232100010008 SC CONCRETO FC=175 kg/cm2 m3 0.1250 413.19 51.65
51.65
Rendimiento und/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : und 1,896.01
38.36
Materiales
0204240030 ABRAZADERA DE ALUMINIO und 2.0000 2.60 5.20
02051000020008 CODO PVC ISO 200 mm x90º und 1.0000 545.49 545.49
1,804.85
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 38.36 1.15
1.15
Subcontratos
04232100010008 SC CONCRETO FC=175 kg/cm2 m3 0.1250 413.19 51.65
51.65
Rendimiento und/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : und 3,788.77
38.36
Materiales
0204240030 ABRAZADERA DE ALUMINIO und 2.0000 2.60 5.20
02051000020009 CODO PVC ISO 250 mm x90º und 1.0000 1,114.68 1,114.68
3,697.61
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 38.36 1.15
1.15
Subcontratos
04232100010008 SC CONCRETO FC=175 kg/cm2 m3 0.1250 413.19 51.65
51.65
Rendimiento und/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : und 784.78
161.71
Materiales
02010300010001 GASOLINA 84 gal 0.0300 16.94 0.51
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3000 27.00 8.10
02150200020005 CODO CACHIMBA 45º PVC D=160 mm UF und 1.0000 38.58 38.58
0222080012 PEGAMENTO PARA PVC gal 0.0630 54.78 3.45
02902500060002 SILLA TEE PVC P/CONEXION DE DESAGUE DE 160x160 mm und 1.0000 369.00 369.00
607.41
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 161.71 8.09
15.66
Rendimiento und/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : und 503.59
161.71
Materiales
02010300010001 GASOLINA 84 gal 0.0300 16.94 0.51
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3000 27.00 8.10
02150200020005 CODO CACHIMBA 45º PVC D=160 mm UF und 1.0000 38.58 38.58
02902500060003 SILLA TEE PVC P/CONEXION DE DESAGUE DE 200x160 mm und 1.0000 87.81 87.81
326.22
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 161.71 8.09
15.66
Rendimiento und/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : und 504.66
161.71
Materiales
02010300010001 GASOLINA 84 gal 0.0300 16.94 0.51
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3000 27.00 8.10
02150200020005 CODO CACHIMBA 45º PVC D=160 mm UF und 1.0000 38.58 38.58
02902500060004 SILLA TEE PVC P/CONEXION DE DESAGUE DE 250x160 mm und 1.0000 88.88 88.88
327.29
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 161.71 8.09
15.66
Rendimiento m2/DIA 180.0000 EQ. 180.0000 Costo unitario directo por : m2 17.63
3.78
Materiales
02010300010001 GASOLINA 84 gal 0.0800 16.94 1.36
13.07
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.78 0.11
0.78
Rendimiento m2/DIA 200.0000 EQ. 200.0000 Costo unitario directo por : m2 16.32
2.67
Materiales
0201040001 PETROLEO D-2 gal 0.2200 19.61 4.31
11.05
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.67 0.08
03012200080002 CAMION IMPRIMADOR 6X2 178-210 HP 1,800 gl hm 0.5000 0.0200 126.05 2.52
2.60
Rendimiento m2/DIA 200.0000 EQ. 200.0000 Costo unitario directo por : m2 32.76
5.41
Materiales
02010300010001 GASOLINA 84 gal 0.0064 16.94 0.11
26.58
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 5.41 0.16
0.77
Rendimiento m2/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : m2 2.24
2.17
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.17 0.07
0.07
Fecha : ###################
S10 Página 1
Fórmula Polinómica
Fecha 17/11/2022
: 04:50:52p.m.