Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ACLARACIÓN .................................................................................................................. VI
I. GENERAL ...................................................................................................................... 1
B. Proyecto Aprobado.............................................................................................. 4
5. Servicios Subterráneos.................................................................................. 10
A. AREMA ............................................................................................................. 10
B. ASTM ................................................................................................................ 11
A. SUB-BALASTO..................................................................................................... 22
B. DURMIENTES................................................................................................... 23
G. PLANCHUELAS ................................................................................................ 27
J. CLAVOS............................................................................................................ 29
K. BALASTO.......................................................................................................... 29
M. HERRAJES ....................................................................................................... 30
N. DESCARRILADORES....................................................................................... 31
O. ANCLAS ............................................................................................................ 31
1. Tipos..................................................................................................................... 32
2. Aproximaciones ................................................................................................... 33
Q. SEÑALAMIENTOS............................................................................................ 34
2. Cerrojos Eléctricos:........................................................................................ 35
1. Herraje: .......................................................................................................... 37
1. Pendiente .......................................................................................................... 39
(KCSM) como una guía para la construcción de vía y/o periféricos a la misma, y se debe
usar solamente como una guía. KCSM no asume ninguna responsabilidad cualesquiera,
por algún daño a propiedad o lesiones a personas que puedan surgir de la información
aprobar por escrito por medio de una carta de factibilidad todos los proyectos antes de
Para recibir comentarios y aprobación por parte de KCSM, previo a los permisos y
diseño propuesto por el cliente. Una vez que se tengan los comentarios y
al anteproyecto.
información faltante. Esta ficha se anexara junto con el plano o planos u otros
apoyo, espuela de penetración, peine de vías, entre otros) junto con la conexión
tangentes y curvas. Deberá de contener el límite del derecho de vía indicado para
esa zona de vía principal (KCSM podrá dar este dato previo solicitud del mismo).
elevaciones y pendientes.
• Se incluirá una tabla con los datos de las curvas a proyectar (grados, radios, sub-
mencionadas.
La revisión del anteproyecto se realizará sin costo alguno. Una vez que se someta
B. PROYECTO APROBADO
por medio de la carta de factibilidad emitida por KCSM, será la base de un Acuerdo
Las condiciones pueden prevenir cumplimiento con todas y cada una de las
aprobación a la SCT.
o falla de KCSM para objetar cualquier trabajo realizado, material usado o diseño o
todo tiempo que la vía principal no sea obstaculizada en ningún momento al estar
siendo atendidos. Con este objetivo se deberán de diseñar los laderos de apoyo,
derecho de emitir comentarios acerca de las obras a proyectar y será el único que
D. NOTAS GENERALES
1. Trabajo de KCSM:
recomienda que los contratistas que ejecuten los trabajos estén dentro
4. Contratistas de Vía
A. AREMA
Capítulos y Partes del Manual AREMA en esta publicación como Capitulo AREMA
(), Parte ( ).
mas actualizada.
Las Especificaciones para riel soldado continuo, vía en placa, cruceros de vía y
a una carga de diseño de Copper E-80, e incluir impacto sin martilleo, cuando se
general, las vías se clasifican como “Clase III” según lo define AREA.
Es aquella vía que siendo construida por un cliente, empieza en una Vía
conserva el cliente con el fin de que, bajo acuerdo previo entre este
vía, ésta se podrá llevar a cabo sin problema alguno, llevándose a efecto
respecto.
2. Servicio General:
Una vía en la que los carros son loteados con equipo y personal de la
vías.
Una vía en la que los carros son loteados de vía por locomotoras u otros
vías.
IV. TOLERANCIAS
La tolerancia mínima horizontal desde el centro de línea de la vía tangente hasta
cualquier estructura u obstrucción a nivel de hongo de riel o más arriba deberá ser
3.50m. En el caso de que la vía este en curva será necesario incrementar la tolerancia
en ambos lados de la vía en 2.00cm por cada grado de curvatura métrico, con un
máximo de 50cm.
Cualquier tolerancia o espacio menor que lo anterior deberá tener aprobación PREVIA
de KCSM. La industria deberá colocar y mantener todos los anuncios de advertencia, y/o
otros dispositivos que requiera KCSM. Refiérase al AREMA para cualquier duda con
KCSM deberán estar gobernados por las secciones aplicables del Manual de AREMA a
menos que se indique de otra manera. Los cables no se deberán poner dentro o a través
las vías no se deberá permitir que sea menor que lo especificado en la siguiente tabla, y
cuando se instalan por primera vez las tolerancias deben ser mayores para tomar en
cuenta la catenaria (estas medidas son de hongo de riel a la distancia mínima del objeto
superior):
El propietario deberá de garantizar que de ninguna manera se cree inducción sobre las
necesarias para la vía incluyendo las que estuvieran dentro del Derecho de Vía de
KCSM. Este trabajo incluirá todas las limpiezas (despalme y desmontes), cortes y
Los anchos de la corona del terraplén serán como se muestran en el Dibujo Número
Las zanjas o cunetas de drenaje deberán apegarse con el proyecto, con el mínimo
principal importancia para una estructura de vía estable y se debe completar antes de
aceptar el trabajo.
bombeo sobre la corona del terraplén deberá tener una pendiente de 2% para ambos
RB-205).
largo y 5.10m desde el centro de vía, centrado alrededor de la localización del árbol de
La compactación deberá ser tal que los materiales estén compactadas uniformemente a
un 90% de VRS máximo, de acuerdo con ASTM Designación D698, Método A. Todos los
suelos del terraplén y 30cm debajo del nivel terminado en los cortes que se encuentren
VIII. DRENAJE
Las estructuras de drenaje deberán de ser de área hidráulica suficiente para manejar el
En caso de utilizar tubería ésta deberá de ser de metal corrugado galvanizada, pegada
con fibra y recubierta con asfalto, o ADS con un espesor de pared como se muestra en la
TABLA 1
Altura Mínimas de colchón sobre lomo del tubo D/2 pero no menos de 2.0' (3.0' debajo
2) Use tubo de 78" de diámetro para paso de ganado - se debe ordenar con
3) Los largos de tubos deben ser adecuados para proteger las pendientes de
los terraplenes.
Las bandas de conexión para tubería metálica deben ser de 24 pulgadas de largo y
Cualquier otro tipo o tamaño de estructura de drenaje deberá tener aprobación por
deseada del tubo es de 2 a 4% con 0.5% como mínimo. Los tubos se deben instalar con
Para asegurar una resistencia adecuada del tubo de metal corrugado, se debe obtener
debajo del tubo se debe quitar y cambiar por material apropiado. Material firme
seleccionado se debe usar para realizar el acostillado de los tubos. Debe estar libre de
material mayor a 3 pulgadas de tamaño y debe estar libre de materia orgánica y otras
opuestos del tubo en capas de no más de 15cm de espesor, para una distancia a cada
lado del tubo igual a su diámetro y cada capa compactada a las especificaciones
Las estructuras de drenaje aparte de tubos y/o alcantarillas, si las hay, las debe diseñar
un ingeniero profesional registrado con cédula profesional que lo avale. Los planos para
tratamiento.
A. SUB-BALASTO
KCSM, y deberá consistir de material no mayor de 1/2" con 85% pasando la malla
de 3/8", 45 a 75% pasando la malla No. 4, y 0 a 15% pasando la malla No. 40, y
deberá contener suficientes finos para proveer una base impermeable cuando se
Deberá de ser de 20cm con un VRS de 20% y con un índice plástico no mayor a 15.
grado de compactación del 95%. El cemento Pórtland deberá cumplir con las
A. RIEL
Servicio de Tren Unitario, loteado por KCSM. El riel de segunda mano de calidad de
El calibre de riel mínimo aceptable será de 112 o 115 libras/yd. Se debe construir
Otros defectos no deben afectar la resistencia del riel. El desgaste del hongo de riel
no debe exceder 3/8 de pulgada. Refiérase al capitulo 5, Parte 4.3 de AREMA para
más detalles.
B. DURMIENTES
Los durmientes de madera deben ser nuevos, tamaño mínimo de 7" x 8" x 9' para
libras/pie3.
transversal de 7" x 9" y los largos mínimos deben cumplir con los planos de vía
Los durmientes de vía industrial principal o servicio que se encuentren dentro del
durmientes con calidad para industria que cumplan con las medidas arriba
Todas las partes deben ser nuevas o buenas de segunda mano, aun cuando se
particular se realiza en una vía de operación, ya sea principal o secundaria que por
D. ÁRBOLES DE CAMBIO
Árboles bajos Racor 36D ó 22 con varilla conectora de 4'-6", similar o igual a las
árboles altos 56-B. El círculo blanco con el punto negro debe estar alineada con la
vía principal y la flecha roja alineada con la vía a la que se esta cambiando. Se
deben usar varillas conectoras de tres pies seis pulgadas (3’-6”) solo en árboles
localizados entre vías o donde las condiciones inusuales lo dictan, tales como
de la vía que pone en tensión la varilla conectora cuando está alineado para la vía
E. PLACAS DE ASIENTO
Las Placas de asiento deberán de ser de doble hombro; pueden ser nuevas o de
segunda mano. Las placas deben estar libres de defectos graves y materiales
Servicio. Cuando se usen deben tener las mismas dimensiones que la placa de
asiento y un espesor nominal de 1/4”. Los cojinetes debe ser fabricados por A.
En la vía industrial particular principal no se aceptará vía clásica debiendo ser ésta
vía elástica. Esta especificación es solo para vía industrial de servicio que no
cumplan con los requerimientos de AREMA y deben estar libres de material extraño
y sin defectos graves. Todas las planchuelas deben de ser para la sección de riel
H. PLANCHUELAS DE COMPROMISO
En la vía industrial particular principal no se aceptará vía clásica debiendo ser ésta
vía elástica. Esta especificación es solo para vía industrial de servicio que no
de riel para la que están diseñadas y deben estar libres de materiales extraños y sin
defectos graves. Las barras deben estar completamente atornilladas. Las juntas no
riel excede a 25 libras. Cuando esto se vuelve necesario, un riel de peso intermedio
En la vía industrial particular principal no se aceptará vía clásica debiendo ser ésta
vía elástica. Esta especificación es solo para vía industrial de servicio que no
ovalado, una arandela o guasa de presión y una tuerca. Metal para el tornillo, la
guasa de presión y la tuerca de acuerdo con AREMA Capitulo 4, Parte 2.9 & 2.10.
Se deben usar clavos nuevos de 9/16" x 5-1/2" o 5/8" x 6" para todos los calibres de
riel. Todos los clavos deben cumplir con las especificaciones de AREMA y deben
K. BALASTO
Se debe usar material basáltico o granito en las vías industriales principales que
se podrá aceptar la escoria de fundición. El balasto debe estar libre de tierra, polvo,
y otras partículas extrañas. El espesor del balasto por debajo de durmiente debe
Todas las vías con tope estarán protegidas por un dispositivo de detención de
tope apropiado o igual al tipo Hayes "WD" para uso general, o tipo "WA" para
servicio pesado.
una pila de tierra de 4 pies de alto, 8 pies de ancho y 20 pies de largo con la vía
M. HERRAJES
Todos los materiales de los herrajes deben ser compatibles con la sección de riel
KCSM requiere que los herrajes cumplan con las especificaciones de herrajes
la vía principal de KCSM deberá ser No. 11, fuera de un ladero no menos de No. 9.
En casos especiales como que la conexión del cliente sea dentro del corredor
principal de KCSM (Lázaro Cárdenas a Laredo) el herraje mínimo a utilizar será del
industriales de servicio.
N. DESCARRILADORES
La protección con descarriladores se requiere en todas las vías que van saliendo de
una vía principal, ladero, vía industrial principal o cualquier otra vía en la que se
realicen loteos, donde existe la posibilidad de que los carros sueltos puedan afectar
dirección del descarrilador de manera que el carro descarrilado no afecte la vía que
especiales.
O. ANCLAS
Las anclas de riel pueden ser cualquiera de los diferentes tipos y deben ser del
servicio se anclarán al 33%, es decir, un durmiente sí y dos no. Las vías industriales
principales se anclarán al 50%, es decir, un durmiente sí y el otro no. Para las vías
adecuada para contrarrestar los esfuerzos por temperatura de riel. Los durmientes
Todos los cruceros deben tener una aprobación previa del representante autorizado
1. Tipos
Este se debe usar en casos de tráfico de alto volumen con carga pesada.
Este crucero es particularmente apropiado para usar bajo las llantas sólidas
2. Aproximaciones
vida útil del cruce. El perfil del camino debe estar a nivel con la parte superior
de los rieles (hongo de riel) a una distancia no menor a 10 pies (3m) a cada
superficie a nivel cuya longitud deba de ser de promedio igual al tipo de carro
En las vías sobre la cuales operan los trenes y/o locomotoras de Kansas City
escritos:
• NOM-050-SCT2-2001
• NOM-034-SCT2-2003
R. SEÑALIZACION
En todos aquellos casos que la o las vías particulares vayan a conectarse a una vía
señalizada deberán aislarse por medio de juntas aisladas las cuales se instalarán
construcción de la vía pero instalado por el mismo personal técnico de KCSM. (al
menos supervisado en cuyo caso el personal que instale los equipos deberá
No obstante lo anterior cada caso será tratado en forma independiente según las
Ferrocarriles (AAR).
En toda vía secundaria que conecta a una vía principal señalizada se busca
2. Cerrojos Eléctricos:
Eléctrico.
siguiente esquema:
planos aprobados.
1. Herraje:
dependiendo del tipo de vía y servicio, o más grande. El dibujo KCSM No.
2. Curvas Horizontales:
menos 35m.
deben operar sobre curvas reversibles que tengan una o ambas curvas
3. Espirales Horizontales:
4. Vía Tangente:
de vía y las curvas verticales. Las pendientes deben estar limitadas a 1.5% o
menos, con curvas verticales de 100 pies (30m) mínimo provistas en los
1. Pendiente
2. Curvas Verticales:
MPH) (>80KPH) no debe ser mas de 0.05 pies por estación (de 100
MPH (32 KPH), la relación de cambio no debe ser mayor de 2.0 por
manera:
d
R=
L
Donde:
son las mismas para puntos correspondientes a cada lado del vértice.
Las correcciones son (-) cuando la curva vertical es cóncava hacia abajo
Por ejemplo:
R = 0.72/6=0.12
hacia abajo).
primera estación (la mitad de la relación de cambio) multiplicado por el cuadrado del
9(0.06)=0.54.
las estaciones 12 y 14 ya que están a la misma distancia de PVC y PVT. Así que,
Est. 10 90.00
relación= 0.50-0.06
Est. 11 90.44
relación= 0.44-0.12
Est. 12 90.76
relación= 0.32-0.12
Est. 13 90.96
relación= 0.20-0.12
Est. 14 91.04
Est. 15 91.00
relación= -0.04-0.12
Est. 16 90.84
3. Compensación de curva
D
Gd =
Cc
donde:
Cc = 0.04 (%/Grados)
punto de la espiral-a-curva.
ha completado, el contratista o cliente avisará a KCSM para una inspección final. Esta
inspección final junto con la debida autorización de la SCT será la parte fundamental
El uso de la vía por parte de locomotoras y vagones antes de este boletín no constituye
una aceptación.
retener el pago final del contratista hasta que KCSM acepte el trabajo final.
PERCENT MATERIAL PASSING NO. 200 SIEVE 1.0% 1.0% 1.0% 1.0% 1.0% C 117
BULK SPECIFIC GRAVITY (SEE NOTE # 2) 2.60 2.6 2.60 2.3 2.90 C 127
CLAY LUMPS 8 FRIABLE 5 CYCLES 0.5% 0.5% 0.5% 0.5% 0.5% C 142
BALLAST GRADATION
NOMINAL SIZE
DESCRIPTION PERCENT PASSING
SQUARE OPENING
2-1" -3"
MAIN TRACK LARGE
(AREMA # 24) 90-100 25-60 0-10 0-5
2 4
MAIN TRACK
3 100 60-90 10-35 0-10 0-3
(AREMA # 4A) 2" - " 90-100
4
*SIDING SECONDARY
3
MAIN 1" - " 100 100 100 90-100 40-75 15-35 0-15 0-5
(AREMA # 5)
8
YARD & INDUSTRIAL
*
TRACKS
1" - NO. 4 100 100 100 95-100 25-60 0-10 5
(AREMA # 57)
SCALE: NONE
BALLAST & GRADATION PROPERTIES
STANDARDS RB-100
DRAWN BY: DLL CHIEF ENGINEER
SIEVE OPENING ( SQ. IN.)
2 1/2" 2" 1 3/4" 1 1/2" 1 1/4" 1" 3/4" 1/2" 3/8" NO. 4 NO. 8 NO. 200
100
90
80
GHT)
A B C D
50 SQUARE
OPENING
PERCENT PASSI
40 2 1/2" 100
2" 90-100
30 1 3/4"
1 1/4" 100
20
1" 10-35 90-100 100
NO. 8 0-1
ITEM DESCRIPTION ITEM NUMBER
NO. 200 0-.5 0-.5 0-1 3-10
D BASE MATERIAL -
SCALE: NONE
BALLAST GRADATION TABLE
STANDARDS RB-101
DRAWN BY: DLL CHIEF ENGINEER
Top Of Slope Of Subgrade/Subballast
17’
> Industry Track
Switch Stand
(Point of
switch)
Top Of Slope For Walkway
15’
8’ 17’ 7’ MIN
5’
MIN
8’
SCALE: NONE
AT SWITCH STAND
STANDARDS (NEW CONSTRUCTION)
RB-204
DRAWN BY: WLC CHIEF ENGINEER
16’-0"
6’-0"
8’-0"
16’-0" 4’-0" C
L
8’-0"
6’-0"
PLAN VIEW
16’-0"
4’-0"
6’-0" 6’-0"
1/
12
TO
1 1
4’-0" TO COMPACTED FILL
12
1/
SIDE VIEW
NOTES:
UNLESS OTHERWISE SPECIFIED, EARTH BUMPER IS TO BE USED. TIES, RAILS AND OTHER MAKESHIFT BUMPERS ARE TO BE AVOIDED.
PREFABRICATED BUMPERS ARE TO BE USED AT LOCATIONS WHERE SPACE IS LIMITED AND ONLY ON AUTHORITY OF CHIEF ENGINEER.
9"
20" (TYP.)
"
6
-
FIELD PANEL 1
’
0"
-
9’
"
-0
COMPACTED ASPHALTIC MATERIAL 6’
50.5"
EDGE OF EXISTING PAVEMENT
3"
"
6
-
’
1
"
12" BALLAST -6
1’
"
-6
" 1’
-0 4
9’ "
-6 "
1’ 4
"
"
-6
1’ 4’
-2
"
-6 "
1’
"
-6
’
1
12" SUB-BALLAST (MIN.)
NON-WOVEN FILTER FABRIC
RECOMMENDED 4"-6" SCH. 40 PERFORATED PIPE OR
GAUGE PANEL
CORRIGATED GALVINIZED PIPE (PERFORATION DOWN). 4
ISOMETRIC VIEW
"
Note:
1’ END PANELS TO EXTEND A MINIMUM
-8
GAUGE PANEL "
OF 3’ BEYOND EDGE OF PAVEMENT
9’-0"
PANEL WIDTH
C 3ea 8" 4ea 6" 4ea 6" 4ea 6"
(Gage Section)
CUT OUTS
E 1"X3" 1"X3" 1"X3" 1"X3"
(Both Sides)
GENERAL NOTES:
PANELS:
Panels shall be constructed of #4/5 gum crossties, properly sized for
required panel prior to preservative treatment. Treatment used (type of
preservative and retention) shall be a 70/30 solution at 8# per cubic ft.
Panels shall be full depth and 8 ft. in length. Shims will not be allowed.
Panels shall be secured to the ties using dome head drive spikes.
Spikes for 90# rail shall be "x11" and spikes for 112# to 136# shall
be "x12". Each section shall be drilled in the field to receive 8
spikes.
The top surface of any panel, should it fit against the rail head
on the field side, shall have a dap of "x3". Panels shall be bored,
chamfered, beveled, dapped and cut out as required prior to treament.
CROSSTIES:
New 7"x9"x9’-0" creosote pressure treated crossties made of oak or
similar hardwood shall be accurately spaced at 19" centers throughout
Panel 17" 31" 31" 17" the length of the crossing. After the panel sections have been properly
located, " holes shall be bored.
A
RAIL:
Panel Continuous welded rail shall be used throughout the crossing and
RIGHT ANGLE CROSSING shall extend a minimum of 39 ft beyond the ends of the panel sections.
A
PLAN MASTIC:
SKEWED CROSSING Asphaltic mastic such as A.S.T.M. D-491-41 shall be used to fill the
8" open area between the existing pavement and the panel sections and between
NO SCALE the field side of the rails and the panel sections after the crossing is
in place.
B 4"
DRAINAGE:
q If the crossing has an existing pipe system for drainage, the
28" 28" installation of the new perforated pipes of equal size wrapped with
A non-woven filter fabric will be required at the locations in the section
2"-3" 2"-3" view.
Ballast through crossing to be a minimum of 12" below tie, ensure
Full Depth tie crib on each side of crossing is empty.
BILL OF MATERIALS
7"
END LENGTH
TO P.S.
STITCH TIES
LEAD
END OF
P.S to Frog P.I.
P.S.
q FROG ANGLE q
FROG ANGLE
q
PLAN OF TURNOUT
TABLE NO. 1
#9 #11 #12
END TO P.S. Varies Varies Varies
SWITCH POINT LENGTH 16.50’ 16.50’ 16.50’
P.S. TO FROG P.I. 30.17’ 31.25’ 39.67’
LEAD 72.92’ 83.50’ 96.67’
LENGTH 107.38’ 124.63’ 136.00’
FROG ANGLE 6^ 21’ 35" 5^ 12’18" 4^ 46’ 19"
CENTERLINE DEGREE OF CURVE 9^ 20’ 31" 5^ 40’ 44" 5^ 26’ 01"
ABBREVATIONS:
P.S. - POINT OF SWITCH
P.I. - POINT OF INTERSECTION
NOTES:
1. RIGHT HAND TURNOUT SHOW
2. LEFT HAND TURNOUT IS OPPOSITE
3. HEAVY LINES REPRESENT TRACK GAGE LINES
4. TURNOUTS MEET "BNSF-UP COMMON STANDARDS" SPECIFICATIONS
DISTANCE
C TO C NO. 7 FROG NO. 8 FROG NO. 9 FROG
OF TRACKS
NO. 10 FROG NO. 11 FROG NO. 12 FROG
A B C B C B C B C B C B C
12’-0" 17’-7/8" 17’-11 1/8" 19’-7 9/16" 20’-1 1/2" 22’-2" 22’-10" 24’-8 7/16" 25’-3 9/16" 27’-234" 27’-9 5 16" 29’-9" 30’-3"
13’-0" 24’-7/16" 24’-11 9/16" 27’-7 3/16" 28’-4 7/8" 31’-1 11/16" 31’-10 5/16" 34’-8 1/8" 35’-3 7/8" 38’-212" 38’-958" 41’-8 3/4" 42’-3 1/4"
14’-0" 31’-1/16" 32’-0" 35’-6 13/16" 36’-5 1/4" 40’-1 3/8" 40’-10 5/8" 44’-7 13/16" 45’-4 3/16" 49’-214" 49’-91516" 53’-8 1/2" 54’-3 7/16"
15’-0" 37’-11 5/8" 39’-3/8" 43’-6 7/16" 44’-5 5/8" 49’-1" 49’-11" 54’-7 9/16" 55’-4 1/2" 60’ -11516" 60’-10316" 65’-8 1/4" 66’-3 11/16"
16’-0" 44’-11 3/16" 46’-13/16" 51’-6 1/6" 52’-6" 58’-11/16" 58’-11 5/16" 64’-7 1/4" 65’-4 13/16" 71’-11116" 71’-10916" 77’-8" 78’-3 15/16"
17’-0" 51’-10 3/4" 53’-1 1/4" 59’-5 11/16" 60’-6 3/8" 67’-3/8" 67’-11 5/8" 74’-6 15/16" 75’-5 1/16" 82’-1716" 82’-101316" 89’-7 3/4" 90’-4 3/16"
18’-0" 58’-10 5/16" 60’-1 11/16" 67’-5 5/16" 68’-6 3/4" 76’-0" 77’-0" 84’-6 5/8" 85’-5 3/8" 93’-1316" 93’-11116" 101’-7 1/2" 102’-4 7/16"
19’-0" 65’-9 7/8" 67’-2 1/8" 75’-4 15/16" 76’-7 1/8" 84’-11 11/16" 86’-5/16" 94’-6 5/16" 95’-5 11/16" 104’-01316" 104’-1138" 113’-7 1/4" 114’-4 11/16"
20’-0" 72’-9 1/2" 74’-2 9/16" 83’-4 9/16" 84’-7 1/2" 93’-11 3/8" 95’-5/8" 104’-6 1/16" 105’-6" 115’-058" 115’-1158" 125’-7" 126’-4 15/16"
SCALE: NONE
DATA FOR CROSSOVERS
STANDARDS TO-104
DRAWN BY: DLL CHIEF ENGINEER
POINT OF SWITCH TO LAST TURNOUT 105’-8"
16’-0" FROG
15"
15"
9’
-6" G
UARD
RAI
LS
16’-6"
1
FROG NUMBER 9
HEEL SPREAD 64" FROG ANGLE 6 21’ 35"
LENGTH # OF TIES ITEM No.
FROG ANGLE
S
P.
SW ITCH
POINT OF
TURNOUT
RADI
US 61
5.1
2’ LENGTH OF SWITCH 16’-6" 12’ 7
RADIUS OF CURVE L
( C ) 615.12’ 16’ 6
BEN
1
6 4"
49’-7 1/4" 22’ -
CURVE CLOSURE RAIL
NOTE:
STRAIGHT CLOSURE RAIL 49’-6" 23’ -
7’-2 1/8" 17’-6"
10’ MINIMUM TIES ON MAINLINE TURNOUT.
GUARD RAIL LENGTH 9’-6" 24’ -
PS TO PITO 29.54’
SCALE: NONE
& SWITCH TIE LAYOUT
STANDARDS TO-111
DRAWN BY: DLL CHIEF ENGINEER (FOR MAINTENANCE ONLY)
POINT OF SWITCH TO LAST TURNOUT 115’-11"
20 1/2" 2 @ 20"
15" 9’
-6" G
UARD
RAI
LS
16’-6"
7 EA. 9’ TIES 15 EA. 10’ TIES 8 EA. 11’ TIES 7 EA. 12’ TIES 6 EA. 13’ TIES 6 EA. 14’ TIES 7 EA. 15’ TIES 8 EA. 16’ TIES
1
56’ 114"
1
43’ 52" No.10 Frog 16’6"
3
29’ 114" 6’ 5" 10 ’1"
1
12 4" 21" 5
2’-8 8" Toe Heel Rail And Turnout Data # 10
1
Heel Spread 6
4" No Scale
Frog Angle 5 43’ 29"
Frog
Heel of
tch
FROG NUMBER 10
tch
nt of
Heel Spread 12
8"
nt
Swi
FROG ANGLE
Poi
Poi
Turnout LENGTH
Radi
us 779. FROG LENGTH 16’-6" HT ITEM No.
39’
PF To E
16’-6" Switch Points nd of S TOE LENGTH 6’-5"
wi
tch Ti
es 37’ 9’ 7
6"
HEEL LENGTH 10’-1"
10’ 15
LENGTH OF SWITCH 16’-6"
11’ 8
SWITCH ANGLE
13’ 6
15’ 7
DEGREE OF CURVE ( C )
d
1
6 4"
L
16’ 8
SCALE: NONE
& SWITCH TIE LAYOUT
STANDARDS TO-112
DRAWN BY: DLL CHIEF ENGINEER (FOR MAINTENANCE ONLY)
POINT OF SWITCH TO END OF SWITCH TIES 124’-3"
4 1/2" FROM EDGE OF TIE TO START OF SWITCH RAIL ACTUAL LEAD 91’-10 1/4"
2 @ 20"
21" 20" 3 @ 20" 4@19" 22 1/2" 17" 20" 3 @ 19" 21" 21 1/2"
27 @ 19 1/2" 6 @ 19 1/2" 13 @ 19 1/2"
15" 1
A 5’ GU
ARD R
AI
LS
19’-6"
B C
10 EA. 9’ TIES 8 EA. 12’ TIES 8 EA. 13’ TIES
BILL OF TIES
FROG ANGLE 9’ 10
SWITCH OPERATION A B C
RADIUS OF CURVE ( L
C ) 927.27’ 16’ 8
63’-0" 22’ -
CURVE CLOSURE RAIL
NOTE:
SCALE: NONE
& SWITCH TIE LAYOUT
STANDARDS TO-113
DRAWN BY: DLL CHIEF ENGINEER (FOR MAINTENANCE ONLY)
175’ 8-1/2"
126’ 4-1/2"
1 1 1 1 1
19 2"21"20"20"19 2"
182"20"19 2"20"212" 19"19" 23"19"19" 19"19"19" 20"20"20"17"
8 @ 21 15 @ 20" 16 @ 21" 11 @ 20" 11 @ 19-1/2" 9 @ 20" 14 @ 21"
73’-6"
2’ 9-3/4"
9’-5" 14’ 11-1/2"
12-1/8"
21-1/4"
51’-9"
TOE HEEL
SW ITCH
SW ITCH
OF
TURNOUT RADI
US 1
720.
77
POINT
HEEL
P.
F.TO END
OF SWI
TCH TI
ES 49’
-4"
FROG NUMBER 15
* INCLUDES 2 EA. 17’
FROG ANGLE HEAD BLOCK TIES
1720.77 14’
RADIUS OF CURVE ( L
C ) 9
SCALE: NONE
& SWITCH TIE LAYOUT
STANDARDS TO-116
DRAWN BY: DLL CHIEF ENGINEER (FOR MAINTENANCE ONLY)
T (SEE TABLES A & B)
- 0"
17’
TRACK LENGTHS OF
ITEM NUMBER
PT.
SWITCH RAIL
FROG NUMBER
TOE LENGTH
CROSS TIES
PT.
LENGTH OF
QUANTITY
REPLACED
OF TIES
MEASURE
2"
BOARD
-----
-----
-----
-----
-----
-----
-----
-----
-----
LEAD
1
2"
P.S TO
1
TO
NOTES:
TRACK LENGTHS OF
ITEM NUMBER
PT.
SWITCH RAIL
FROG NUMBER
TOE LENGTH
CROSS TIES
PT.
LENGTH OF
QUANTITY
REPLACED
OF TIES
MEASURE
2"
BOARD
-----
-----
-----
-----
-----
-----
-----
-----
-----
LEAD
1
2"
P.S TO
1
TO
SCALE: NONE
BILL OF SWITCH TIES
STANDARDS TO-119
DRAWN BY: RGT CHIEF ENGINEER
ACTUAL LEAD 23
4
11
18
10 OVERALL LENGTH
TANGENT ADJACENT
9 TO TCE OF FROG TOE LENGTH HEEL LENGTH
1 1 1
8" POINT OF SWITCH HEEL SPREAD 6 4" 19 20 2" POINT OF FROG
8 14 16
CURVED CLO 6
SURE RAI
L
LENGTH OF 12
13 2 22
SWITCH RAIL 5 HEEL SPEAD
STRAIGHT CLOSURE RAIL TOE SPREAD
HEEL SPEAD
P.C. 21
17
SWITCH ANGLE
3 P.
T.
RADI
US OF CENT 7
ERLI
NE
TANGENT ADJACENT TO
SWITCH RAIL
15
24
TURNOUT AND CROSSOVER DATA
PROPERTIES CLOSURE
LEAD CURVE GAGE LINE OFFSETS
OF SWITCHES DISTANCE
COL. COL. COL. COL. COL. COL. COL. COL. COL. COL. COL. COL. COL. COL. COL. COL.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
RAIL
RAIL
FROG
TO
TO
OF
OF
STRAIGHT
CLOSURE
CLOSURE
TANGENT
TANGENT
SWITCH
ACTUAL
NUMBER
CENTER
DEGREE
CURVED
ANGLE
CURVE
ADJACENT
ADJACENT
RAIL
RAIL
FROG
LINE
LEAD
LENGTH
RADIUS
OF
SWITCH
SWITCH
OF
TOE
FT.IN. DEG.MIN.SEC. FT.IN. FT.IN. FT.IN. FEET DEG.MIN.SEC. FT.IN. FT.IN. FT.IN. INCHES INCHES FT.IN. FEET FEET
5 11-0 2-39-34 42-6 1/2 28-0 28-4 177.80 32-39-56 18-0 25-0 32-0 11 13/16 20 5/8 2-8 7/8 0.00 0.78
6 11-0 2-39-34 47-6 32-9 33-0 258.57 22-17-58 19-2 1/4 27-4 1/2 35-6 3/4 12 3/8 21 5/8 2-10 0.00 1.75
7 16-6 1-46-22 62-1 40-10 1/2 41-1 1/4 365.59 15-43-16 26-2 1/4 35-10 1/2 45-6 3/4 11 3/8 19 9/16 2-6 7/8 0.01 0.00
8 16-6 1-46-22 68-0 46-5 46-7 1/2 487.28 11-46-44 27-7 1/4 38-8 1/2 49-9 3/4 11 7/8 20 9/16 2-8 5/16 0.64 0.00
9 16-6 1-46-22 72-3 1/2 49-5 49-7 1/4 615.12 9-19-30 28-10 1/4 41-2 1/2 53-6 3/4 12 5/16 21 3/8 2-9 7/16 0.00 0.17
10 16-6 1-46-22 78-9 55-10 56-0 779.39 7-21-24 29-11 3/4 43-5 1/2 56-11 1/4 12 1/4 21 2-8 5/8 2.08 0.00
11 22-0 1-19-46 91-10 1/4 62-10 1/4 63-0 927.27 6-10-56 37-8 1/2 53-5 69-1 1/2 12 1/4 21 3/8 2-9 3/4 0.00 0.13
12 22-0 1-19-46 96-8 66-10 1/2 67-0 1104.63 5-11-20 38-8 1/2 55-5 72-1 1/2 12 7/16 21 5/8 2-9 7/8 0.00 0.50
14 22-0 1-19-46 107-0 3/4 76-5 1/4 76-6 3/4 1581.20 3-37-28 41-1 1/4 60-2 1/2 79-3 3/4 12 7/8 21 5/16 2-10 1/2 0.24 0.00
15 30-0 0-58-30 126-4 1/2 86-11 1/2 87-0 3/4 1720.77 3-19-48 51-9 73-6 95-3 12 1/8 21 1/4 2-9 3/4 1.56 0.00
16 30-0 0-58-30 131-4 91-11 92-0 2007.12 2-51-18 53-0 76-0 99-0 12 7/16 21 13/16 2-10 5/16 0.66 0.00
18 30-0 0-58-30 140-11 1/2 99-11 100-0 2578.79 2-13-20 55-0 80-0 105-0 12 3/4 21 1/8 2-10 7/8 0.57 0.00
20 30-0 0-58-30 151-11 1/2 110-11 111-0 3289.29 1-44-32 57-9 85-6 113-3 13 1/16 21 11/16 2-11 3/16 2.47 0.00
LENGTH
LENGTH
LENGTH
NUMBER
SPREAD
SPREAD
ANGLE
HEEL
HEEL
FROG
FROG
TOE
TOE
DEG.MIN.SEC. FEET FEET FEET FEET FEET FT. IN. FT. IN. FT. IN. FT. IN.
5 11-25-16 9-0 3-6 1/2 5-5 1/2 7 15/16 13 9/16 16-10 5/16 18-1 7/8 4-11 7/16 5-0 5/8
6 9-31-38 10-0 3-9 6-3 7 13 20-5 1/2 21-6 1/2 5-11 1/2 6-0 1/2
7 8-10-16 12-0 4-8 1/2 7-3 1/2 7 9/16 13 24-0 3/8 24-11 5/8 6-11 9/16 7-0 7/16
8 7-09-10 13-0 5-1 7-11 7 1/8 12 3/8 27-7 1/8 28-4 7/8 7-11 5/8 8-0 3/8
9 6-21-35 16-0 6-4 1/2 9-7 1/2 8 13 5/16 31-1 5/8 31-10 3/8 8-11 11/16 9-0 5/16
10 5-43-29 16-6 6-5 10-1 7 3/16 12 5/8 34-8 1/8 35-3 7/8 9-11 11/16 10-0 5/16
11 5-12-18 18-8 1/2 7-0 11-8 1/2 7 1/8 13 1/4 38-2 1/2 38-9 1/2 10-11 3/4 11-0 1/4
12 4-46-19 20-4 7-9 1/2 12-6 1/2 7 5/16 13 1/16 41-8 3/4 42-3 1/4 11-11 3/4 12-0 1/4
14 5-05-27 23-7 8-7 1/2 14-11 1/2 6 7/8 13 5/16 48-9 1/4 49-2 13/16 13-11 13/16 14-0 1/4
15 3-49-06 24-4 1/2 9-5 14-11 1/2 7 12 7/16 52-3 7/16 52-8 5/8 14-11 13/16 15-0 3/16
16 3-34-47 26-0 9-5 16-7 6 9/16 12 15/16 55-9 5/8 56-2 1/2 15-11 13/16 16-0 3/16
18 3-10-56 29-3 11-0 1/2 18-2 1/2 6 7/8 12 5/8 62-9 7/8 63-2 3/16 17-11 13/16 18-0 3/16
20 2-51-51 30-10 1/2 11-0 1/2 19-10 6 1/8 12 3/8 69-10 70-2 19-11 7/8 20-0 1/8
SCALE: NONE
TURNOUT DATA
STANDARDS TO-120
DRAWN BY: RGT CHIEF ENGINEER
NOTES
1. SETTING OF TEE RAIL GUARD RAILS.
PLAN BASIC No. 504
FLARE FLARE FLARE FLARE B) BOLTED RIGID & RAIL BOUND FROGS.
15" REF: 6’-0" MIN
REF: THE PARALLEL PORTION OF THE GUARD
MIN NOTE 1A NOTE 1A
RAIL IS TO EXTEND 15" MINIMUM
BEYOND THE THROAT.
C) SPRING FROGS
OPPOSITE SPRING FLANGEWAY
1
3. TAKEN FROM AREMA PORTFOLIO OF TRACKWORK
4’-8 2"
PLANS 502-03.
STANDARD GAGE OF TRACK
7 3 7
1 8" 4’-4 4" 1 8"
GAGE LINE
SCALE: NONE
GUARDRAIL PLACEMENT
STANDARDS TO-121
DRAWN BY: RGT CHIEF ENGINEER
11
1st CUT 11 " FOR RAILS OVER 112 LB.
GAGE LINE OF 16" FOR RAILS OVER 110 LB. GAGE LINE OF 16
STOCK RAIL STOCK RAIL
1 "
2nd CUT
2
" FOR RAILS 110 LB. AND LIGHTER " FOR RAILS 112 LB. AND LIGHTER
"
1 " 5 1 " 5
16
16
4 12" LONG 4 16
5 5
8" 8"
11
1 " 1 "
16 16 A B
7 7 7
1 8" FIRST CUT TO" THICK. 1 8" 1 8"
MIN CHAMFER CUT MAKE SWITCH MIN MIN FOR RAILS 7
2 8" -
POINT" THICK AND RUN OUT OVER 110 LB
3 "
16
IN 2’-0" FROM END OF POINT.
90^ > WEB RADIUS 90^ > WEB RADIUS 90^ > WEB RADIUS FOR RAILS
FOR RAILS HAVING SIDE SLOPE 1
110 LB AND - 1 4"
OF HEAD GREATER THAN 3^-35’, LIGHTER
ANGLE OF CHAMFER CUT (78^)
B
SHOULD BE DECREASED TO MAINTAIN 1 1
90 RA-A 2 6" 1 4"
A
AN ANGLE OF 8^-25’ BETWEEN 1 1
100 RA-A 2 8" 1 4"
ORIGINAL CUT AND CHAMFER CUT
1 1
100 RE 2 8" 1 4"
REINFORCING BARS TO BE 1" THICK FOR RAILS OVER 115 LB, AND 1" THICK FOR RAILS 115 LB AND LIGHTER. SECURED BY" PIVITS IN CENTER LINE OF WEB, EXCEPT HOLES MARKED "B"
ON ELEVATION OF SWITCH POINTS TO BE FURNISHED WITH BOLTS 1" DIA. FOR RAILS OVER 112 LB AND" DIA. FOR RAILS 112 LB AND LIGHTER AND LOCATED AS SPECIFIED ON THIS PLAN.
E X C GRIND TO
SHARP EDGE 1"
POINT POINT
DETAIL MIN
DETAILS DETAILS
STOCK 5100
4000 4000
RAIL TOP OF
AND 6100 AND 6100
STOCK RAIL
1" R HEEL BLOCK - CAST STEEL, CLASS B, HARD
END OF
BOLTS - HIGH TENSILE STEEL, DIAMETER OF BOLTS AND SPACING
SWITCH E X C
SWITCH OF HOLES SHALL CONFORM TO JOINT BAR DETAIL SPECIFIED,
POINT
POINT END OF EXCEPT THAT WHEN SIX HOLE BARS ARE DESCRIBED, THE BLOCK
TOP CUT
" TOP CUT SHALL BE DESIGNED WITH FIVE HOLES, THE SIXTH HOLE TOWARD
BELOW LEVEL " ABOVE THE NARROW END BEING OMITTED AND THE JOINT BARS SHORTENED
SIDE VIEW OF END
ACCORDINGLY
STOCK OF SWTICH POINT
RAIL
ALTERNATE - SHORTER BOLTS NOT EXTENDING THROUGH STOCK RAIL
RAD" MAX
TO BE FURNISHED WHEN SPECIFIED WITH THIMBLE FOR FIRST BOLT
ROUND OFF 1 " RADIUS ROUND OFF
4 " MIN 3
SHARP CORNER SHARP CORNER D+ 1/4" D+ 1/4" INSTEAD OF SOLID SHOULDER MINIMUM THICKNESS OF THIMBLE 16"
1
4" AND MINIMUM BRINELL OR EQUAVELANT HARDNESS 350.
3/8"
REMOVE POINTED EDGES AND
DETAIL E-E DETAIL C-C DETAIL X-X D+ 3/8" D
CHAMFER OFF SHARP CORNERS
NOTES:
ROUNDING OF TOP OF SWITCH POINTS ON STOCK
DETAIL OF SHOULDER BOLT
RAIL SIDE. FILLET RADIUS TO BE" + AT SECTION 1) BASED ON AREMA PORTFOLIO
C-C REDUCING TO 0" AT SECTION E-E D = DIA OF BOLTS OF TRACKWORK PLANS 221-03.
ALLOY STEEL
S.A.E. 4130 OR EQUIVALENT K - KNIFE POINT
" WIDTH OF 5 " HEAT TREATED - BRINELL MIN 275 C - CURVED POINT
8
BOLT HEAD + "
S - SAMPSON POINT
SCALE: NONE
SWITCH POINT DERAILS
STANDARDS TO-122
DRAWN BY: RGT CHIEF ENGINEER
30’-0" BENT STOCK RAIL
SW. PT. WITH BEVELED HELL END
STANDARD 30’-0" CWR SWITCH POINT
5’-7"
6 1/4"
1 2
FOUR TIE STRAP HEEL STANDARD 8’-6" CROSS TIE
SPREAD
HC-3
HC-2
HC-1
HC-1
45
GAGE 4’ 8-1/2"
2"
BP-2
BP-2
BP-2
BP-2
BP-2
P-4
P-4
P-7
P-5
P-5
H-9
12P
13P
14P
11P
10"
RAIL END BEVEL TYPICAL
3 5/16"
0 11/16"
SWITCH HEAD ROD NO. 1 1 3/8" 8’-6" TIES, AS SHOWN, ADDITIONAL MATERIALS
5 3/8"
REQUIRED FROM LOCAL STOCK: 2 EA., SWITCH TIE
7" x 9" x 14’-0" HB TIES. 1 EA., SWITCH STAND.
1 EA., CONNECTING ROD W/HEAD ROD BOLTS.
1 EA., INSIDE GUARD RAIL SECOND HAND W/BEVELED
RAIL ENDS (FIELD CUT). 2 PR., JOINT BARS/COMPROMISE
JOINTS AS REQUIRED. 1 EA., DERAIL SIGN #28.
3 1/4"
5/8" DIA. 4. INSIDE GUARD RAIL TO BE SPIKED TO TIES
BILL OF MATERIAL ITEM No. 6 3/16" 5
"S" BOLT (NO TIE PLATES) USING 8" x 6" TRACK SPIKES.
- 3 1/4"
16’-6" (30’-0") L.H. STRAIGHT SAMSON ROD GUIDE
1 EA. SMJ SWITCH HEAD ROD #1 - RD 2198B
1 SET SWITCH AND BRACE PLATE, AS SHOWN -
2 1/2"
20 EA. AREMA NON-ADJUSTABLE RAIL BRACE -
1/4"
5’-6"
1"
FOUR TIE STRAP
SW. PT.
3’ - 7"
ROD NO. 1
6 1/4"
1 2
HEEL
SPREAD
HC-3
HC-2
HC-1
HC-1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
SW
-8 1/2"
HC-3
HC-2
HC-1
HC-1
GAGE 4’
25"
BP-2
BP-2
BP-2
BP-2
BP-2
H-9
P-5
P-5
P-7
P-4
P-4
17P
16P
15P
14P
13P
12P
11P
17" 5" THROW
1
@ 19- 2"
C/L TIE
3’ - 7" 16’-6"
SW. PT.
1 EA. 30’ RH BENT STOCK RAIL WITH ONE END BLANK AND ONE END BEVELED
1 EA. 30’ LH BENT STOCK RAIL WITH ONE END BLANK AND ONE END BEVELED
SCALE: NONE
16’-6" STRAIGHT SAMSON SWITCH
STANDARDS MANUAL OPERATED LAYPUT FOR SIDE
TO-125
DRAWN BY: DLL CHIEF ENGINEER
2’-2" QUANTITY ITEM DESCRIPTION ITEM NUMBER
GREASE
13" SCREW SPIKE HOLES
1 COVER (S-456) S456M01
FITTING
ARE 1" DIA. (TYP) 1 BASE (D-34678 D34678
D-34678
1 SPRING WASHER " 235102
"
1 SQ. HD. BOLT " x 4" LONG 125108
6
1 CRANK GL1908M02
PLAN VIEW 1 CRANK WASHER 1" FLAT 233017
1"
163006
191001 233017
S456M01
203111
GL3460
215017
1"
D34679
GL1889M01 GL1909M01
233008
ELEVATION VIEW
1608B
SCALE: NONE
RACOR 36E SWITCH STAND
STANDARDS TO-126
DRAWN BY: RGT CHIEF ENGINEER
QUANTITY ITEM DESCRIPTION ITEM NUMBER
2’-4"
1 LINKAGE AND SPRING CAGE ASSY. 22LINK
22
1 SPINDLE GL2762 DRILLED PER CUST REQ GL2762M01
SPIKE HOLES
22E
10"
15
"
SECTION "A" SECTION "B" 4 SQ. HD. BOLT " x 3" LONG 124108
17
4 LOCKWASHER" 239009
"
YOKE
LAMP TIP AND RIVETED TO
SPINDLE DRILLING TRI-HANDLE
2211B 2212C
2211B
2213
RIVET
"
11
NOTES:
22E 2253
1) IT IS RECOMMENDED THAT SWITCH STANDS BE INSPECTED
2254
SCALE: NONE
RACOR 22E SWITCH STAND
STANDARDS TO-127
DRAWN BY: RGT CHIEF ENGINEER
QUANTITY ITEM DESCRIPTION ITEM NUMBER
1 SPINDLE S456M01
1 BASE GL1889M01
1 COLLAR PD9405A02
NOTES:
SCALE: NONE
RACOR 112E COLUMN SWITCH STAND
STANDARDS TO-128
DRAWN BY: RGT CHIEF ENGINEER