COSTOS Y PRESUPUESTOS

VIVIENDA MULTIFAMILIAR DE 3 PISOS Y


AZOTEA

INTEGRANTES:

▪ MORENO NARRO ISABEL CRISTINA (N00176239)


▪ QUIROZ QUISPE CHRISTIAN ALVARO (N0018218)
▪ CHAVEZ GUTIERREZ DIEGO EDUARDO (N00066146)
▪ FLORES FALERO GERY NICOL (N00187654)
▪ PALOMINO MONTOYA LIZETH NICOLE (N00196259)

N° de clase: 12664
DOCENTE: Ing. MARITZA ROSARIO GEJAÑO DONAYRE

LIMA – PERÚ
2021-02
INDICE
2 DATOS GENERALES ...............................................................................................................5
3 UBICACIÓN ...........................................................................................................................6
4 ALCANCE DEL PROYECTO......................................................................................................6
4.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES ...................................................7
4.2 INSTALACIONES PROVISIONALES ..................................................................................7
4.3 TRAZOS, NIVELES Y REPLANTEO ...................................................................................8
4.4 ESTRUCTURAS ..............................................................................................................8
5 DESCRIPCION DEL PROYECTO ...............................................................................................8
5.1 ARQUITECTURA: ...........................................................................................................8
5.2 DISTRIBUCION DEL PROYECTO .....................................................................................8
5.3 DESCRIPCIOON DE LAS AREAS A CONSTRUIRSE............................................................9
5.3.1 PRIMER PISO .........................................................................................................9
5.3.2 SEGUNDO PISO .....................................................................................................9
5.3.3 TERCER PISO .........................................................................................................9
5.3.4 AZOTEA .................................................................................................................9
6 DISEÑO ESTRUCTURAL .......................................................................................................11
6.1 ESPECIFICACIONES DE LOS MATERIALES ESTRUCTURALES .........................................11
6.1.1 Concreto Armado: ..............................................................................................11
7 PARTIDAS DEL METRADO ...................................................................................................11
7.1 PARTIDAS DE ESTRUCTURAS ......................................................................................11
7.2 PARTIDAS DE ARQUITECTURA ....................................................................................12
7.2.1 CIMENTACION: ...................................................................................................15
7.2.2 CIMIENTOS CORRIDOS: .......................................................................................15
7.2.3 SOBRECIMIENTOS ...............................................................................................15
7.2.4 FALSO PISO .........................................................................................................15
7.2.5 ZAPATAS .............................................................................................................15
7.2.6 VIGAS DE CIMENTACIÓN ....................................................................................16
7.2.7 COLUMNAS: ........................................................................................................16
7.2.8 VIGAS ..................................................................................................................16
7.2.9 LOSAS ALIGERADAS ............................................................................................16
7.2.10 ESCALERAS ..........................................................................................................17
7.3 ARQUITECTURA ..........................................................................................................17
7.3.1 OE.3.1. MUROS Y TABIQUES DE ALBAÑILERIA ....................................................17
7.3.2 OE.3.1.1 MUROS DE LADRILLO KING KONG DE ARCILLA .....................................18
7.3.3 OE.3.1.2 MUROS DE LADRILLO PANDERETA .......................................................18
7.3.4 OE.3.1.15 BARANDAS Y PARAPETOS ...................................................................19
7.3.5 OE.3.2 REVOQUES Y REVESTIMIENTOS ...............................................................19
7.3.6 OE.3.1.3 TARRAJEO RAYADO PRIMARIO .............................................................20
7.3.7 OE.3.2.2. TARRAJEO EN INTERIORES...................................................................20
7.3.8 OE.3.2.3. TARRAJEO EN EXTERIORES ..................................................................21
7.3.9 OE.3.2.5 TARRAJEO EN COLUMNAS ....................................................................21
7.3.10 OE.3.2.6 TARRAJEO EN VIGAS .............................................................................22
7.3.11 OE.3.2.11 VESTIDURAS DE DERRAMES ...............................................................22
7.3.12 OE.3.2.19 BRUÑAS ..............................................................................................23
7.4 6.7.2 Revoques y revestimientos ................................................................................23
7.5 1.0 Tarrajeo en fondo de escalera: .............................................................................23
7.6 2.0 Preparación de gradas de concreto: .....................................................................24
7.7 3.0 Preparación de descansos: ...................................................................................24
7.8 4.0 Gradas ..................................................................................................................25
7.9 5.0 Descansos .............................................................................................................25
7.10 6.0 Enchapes ..............................................................................................................26
7.11 7.0.0 CIELORRASOS .....................................................................................................26
7.12 7.1.0 Cielorraso con mezcla ........................................................................................26
7.13 8.0.0 PISOS Y PAVIMENTOS ........................................................................................27
7.14 8.1.0 Pisos...................................................................................................................27
7.15 8.1.1 Parquet ..............................................................................................................27
7.16 8.1.2 Cerámicos ..........................................................................................................28
7.17 9.0.0 ZOCALOS Y CONTRAZÓCALOS ............................................................................28
7.18 9.1.0 Contrazócalos ....................................................................................................28
7.19 9.1.1 Madera ..............................................................................................................28
7.20 9.1.2 Cerámico............................................................................................................28
7.21 10.0.0 Coberturas .......................................................................................................29
7.22 10.1.0 Recubrimientos sobre estructuras de madera ,metal ,etc. ..............................29
7.23 6.7.1 PUERTAS ............................................................................................................29
7.24 6.7.2 VENTANAS .........................................................................................................30
7.25 6.7.3 MAMPARAS .......................................................................................................31
7.26 6.7.4 MUEBLES DE COCINA Y SIMILARES ....................................................................31
7.27 6.7.5 CLOSET ...............................................................................................................32
7.28 6.8 CARPINTERÍA METÁLICA Y HERRERÍA ...................................................................32
7.29 6.8.1 CORTINAS ENROLLABLES DE FIERRO .................................................................32
7.30 6.9 CERRAJERIA ..........................................................................................................33
7.31 6.9.1 BISAGRAS ...........................................................................................................33
7.32 6.9.2 BISAGRAS ...........................................................................................................33
7.33 6.9.3 SISTEMAS O MECANISMOS ................................................................................34
7.34 6.10 VIDRIOS, CRISTALES Y SIMILARES .......................................................................34
7.35 6.10.1 BLOQUES DE VIDRIO ........................................................................................35
7.36 6.11 PINTURA .............................................................................................................35
7.37 6.11.1 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES ...........................35
7.38 6.11.2 PUERTAS ..........................................................................................................36
7.39 6.2 Tanques elevados .................................................................................................36
7.40 OE.3.12.4 .ENCERADO DE PISOS PARQUET.................................................................37
7.41 6.3 Trabajos de jardinería ...........................................................................................37
8 PLANOS ..............................................................................................................................39
8.1 PLANOS DE ARQUITECTURA .......................................................................................39
8.2 PLANOS DE LEVACION ................................................................................................40
8.3 PLANO DE ESTRUCTURA DE ALIGERADO ....................................................................41
8.4 PLANO DE ESTRUCTURA DE CIMENTACION ................................................................42
9 PLANILLA DE METRADO......................................................................................................42
VIVIENDA MULTIFAMILIAR DE 3 PISOS Y
AZOTEA
1 DATOS GENERALES
• UBICACIÓN: Mz. “C” Lt. 265. Los Mangos de la ciudad de Chiclayo,
provincia de Chiclayo, departamento de Lambayeque.
• Nro. DE PISOS: 03 pisos y 01 azotea
• SISTEMA ESTRUCTURAL: Albañilería Confinada
• DISTRIBUCIÓN ARQUITECTONICA:

- Primer Piso:
- Segundo Piso:
- Tercer Piso:
- Azotea:

• MORTERO: cemento-arena 1:4 f’c=210 kg/cm2


• ACERO: f’c=4.200kg/cm2
2 UBICACIÓN
El terreno donde se ha proyectado la vivienda a construirse, se encuentra ubicado en la
Mz. “C” Lt. 265. Los Mangos de la ciudad de Chiclayo, provincia de Chiclayo,
departamento de Lambayeque.

• Linderos y medidas:
El terreno donde se ejecutará el proyecto tiene los linderos y medidas siguientes:

• Por el frente: limita con el Jirón Neptuno, con una longitud de 8.50 m.
• Por la derecha: entrando, en línea recta con el lote Nº 07, con una
longitud de 17.50m.
• Por la izquierda: entrando, en línea recta con la calle Av. Sauces, con
una longitud de 17.50m.
• Por el fondo: limita con el lote Nº 13, con una longitud de 8.00m

3 ALCANCE DEL PROYECTO

En este proyecto tendremos en cuenta los metrados, que es un proceso ordenado y


sistemático de cálculo, cuya finalidad es determinar por partidas según la Norma Técnica
de METRADOS PARA OBRAS DE EDIFICACIÓN Y HABILITACIONES
URBANAS.
Los metrados son basados en formulas usualmente empleados, además nos indica las
normas generales a seguir para la preparación del presupuesto y el procedimiento para
ordenar y copilar toda la información con la finalidad de presentar al propietario de la
obra.

El proyecto es un sistema de albañilería confinada, y los muros en este caso sirven como
un elemento estructural y le aportan resistencia a la edificación.

Las partidas que realizaremos son:

3.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

- OBJETIVOS:
• Poner en conocimiento a detalle acerca de las obras provisionales como los
fines a lograr, el objetivo de estas construcciones y la seguridad que ofrece
estas construcciones.
• Brindar seguridad a los materiales y herramientas usadas en obra; en el caso
de un almacén.
• Dar una atención inmediata a los accidentes o algún malestar de los obreros y
a todo el personal; como un centro sanitario para obreros y personal.

3.2 INSTALACIONES PROVISIONALES

- OBJETIVOS:
• Definir el concepto lugar de trabajo y establecer las necesidades de
infraestructura que presenta un solar y que hay que suplir para que pueda ser
considerado lugar de trabajo.
• Conocer todas las distintas instalaciones auxiliares o provisionales existentes
y necesarias para el correcto funcionamiento de una obra de edificación.
• Satisfacer al personal que se encuentra en la construcción, para que se realice
el trabajo de la mejor manera posible evitando retrasos, por esto se debe de
considerar desde un margen de tiempo adecuado contar con estas
instalaciones.
3.3 TRAZOS, NIVELES Y REPLANTEO
- OBJETIVOS:
• Llevar al terreno los ejes y niveles establecidos en el plano de cimentación,
así como también determinar la ubicación y medida de todos los elementos
que se detalla en el plano durante el proceso de edificación
• demarcar perfectamente los linderos del terreno, así como los ejes de los
ambientes interiores de la vivienda, según las medidas que indican los planos
de arquitectura.

3.4 ESTRUCTURAS
- OBJETIVOS
• Establecer los lineamientos básicos a seguir en las actividades de excavación
sea manual o mecánica para estructuras en las áreas a intervenir en la
construcción de la vivienda unifamiliar.
• Remover el terreno natural, adicional al desmonte, limpieza y descapote, con
el fin de alcanzar las cotas requeridas del Proyecto.
• Alcanzar el plano de arranque de la edificación, es decir las cimentaciones.

4 DESCRIPCION DEL PROYECTO


El proyecto consiste en la construcción de una edificación de 3 pisos y una azotea, sobre
un terreno de 120 m2, el lugar del proyecto está ubicado en el distrito de la Mz. “C” Lt.
265. Los Mangos de la ciudad de Chiclayo, provincia de Chiclayo, departamento de
Lambayeque.

4.1 ARQUITECTURA:
El proyecto contempla realizar un proyecto de tres pisos más azotea. El primer y segundo
piso conforma una vivienda familiar. El tercer piso, conformaran dos viviendas
unifamiliares, cada uno independiente y accesible por la escalera interior que llega hasta
la azotea.

También se plantea un tanque Elevado ubicado en la azotea que dotará de agua a todos
los pisos del inmueble, y cuyo acceso será totalmente independiente.

4.2 DISTRIBUCION DEL PROYECTO


Área del terreno: 120 m2
Perímetro del terreno: 46 m
PRIMER PISO
Área Techada: 90.31 m2
Área Libre: 32.24 m2

SEGUNDO Y TERCER PISO:


Área Techada: 97.35 m2
Área Libre: 25.55 m2

Áreas Techadas:
Primer Piso 90.31 m2
Segundo Piso 97.35 m2
Tercer Piso 97.35 m2
285.02 m2

4.3 DESCRIPCIOON DE LAS AREAS A CONSTRUIRSE


4.3.1 PRIMER PISO
La planta baja de la vivienda es de uso residencial y comercial, cuya distribución es una
sala, comedor, bar, cocina, estudio, terraza, un S.S.H.H., tienda con S.S.H.H., patio, dos
escaleras para el segundo piso, jardín, interior, y un estacionamiento.

4.3.2 SEGUNDO PISO


NPT.+2.80. Consta de dos dormitorios con su closet cada uno, un S.S.H.H., un
dormitorio principal con S.S.H.H. completo, un closet, Star - Tv, balcón y un área de
escalera a los pisos superiores.

4.3.3 TERCER PISO


NPT.+5.60. Conformado por dos viviendas unifamiliares, cada uno tiene sala -
comedor, un dormitorio con closet, un S.S.H.H., un closet, kitchenette y sala – comedor.
Cuando además con un balcón y el área de escalera para el piso superior.

4.3.4 AZOTEA
NPT.+8.40. Tiene un dormitorio de servicio con un S.S.H.H., terraza, lavandería y un
tanque elevado.
A continuación, se presentan las tablas de descripción de áreas que contiene cada uno
del piso
PRIMER PISO AREAS SEGUNDO PISO AREAS
SALA - COMEDOR - BAR 32.96 m2 STAR - TV 20.85 m2
COCINA 11.16 m2 DORMITORIO 1 9.92 m2
TIENDA + S.S.H.H 17.21 m2 DORMITORIO 2 9.66 m2
S.S.H.H 2.04 m2 DORMITORIO PRINCIPAL + S.S.H.H 17.56 m2
ESTACIONAMIENTO 11.83 m2 S.S.H.H 2.90 m2
ESTUDIO 5.39 m2 BALCON 2.43 m2
TERRAZA 7.16 m2 HALL 6.48 m2
JARDIN 5.10 m2 TOTAL 69.79 m2
TOTAL 92.85 m2

TERCER PISO AREAS AZOTEA AREAS


1° VIVIENDA UNIFAMILIAR DORMITORIO DE SEERVICIO 9.92 m2
DORMITORIO 9.92 m2 LAVANDERIA 7.13 m2
KITCHENETTE + SALA - COMEDOR 20.89 m2 S.S.H.H 2.59 m2
S.S.H.H 2.59 m2 TERRAZA 52.53 m2
2° VIVIENDA UNIFAMILIAR HALL 7.58 m2
DORMITORIO 14.60 m2 TOTAL 79.74 m2
KITCHENETTE + SALA - COMEDOR 16.01 m2
S.S.H.H 2.33 m2
HALL 6.48 m2
TOTAL 72.80 m2
5 DISEÑO ESTRUCTURAL
El diseño estructural contempla el diseño de la cimentación, vigas, columnas, losas y
demás elementos no estructurales bajo la normatividad vigente para salvaguardar la vida
de sus ocupantes en caso de presentarse un evento sísmico.

Se utilizará el tipo de construcción Portante y Confinada para las Cimentaciones corridas,


vigas de cimentación y zapatas, con refuerzos de acero corrugado y concreto armado cuyo
diseño corresponde a los métodos de análisis según el Reglamento Nacional de
Edificaciones del Perú.

5.1 ESPECIFICACIONES DE LOS MATERIALES ESTRUCTURALES


5.1.1 Concreto Armado:
• Resistencia del concreto: fc' = 210 Kg/cm²
• Resistencia del acero: fy = 4200 Kg/cm².
• 4.2 Albañilería:
• Ladrillo King Kong = 9*14*24 cm.
• Mortero: cemento – arena 1:4, con juntas de 1.5 cm., verticales y horizontales.
• Debido a las características dadas por la arquitectura se opta por.
• Estructuras de albañilería confinada, con muros portantes de ladrillo Kin Kong,
los tabiques o muros no estructurales serán aislados de la estructura principal
mediante juntas.

6 PARTIDAS DEL METRADO


6.1 PARTIDAS DE ESTRUCTURAS

OE.1.1.1 CONSTRUCCIONES PROVISIONALES


OE.1.1.1.1 OFICINA
OE.1.1.1.2 ALMACENES
OE.1.1.1.3 SERVICIOS HIGIÉNICOS
OE.1.1.1.4 CERCO
OE.1.1.1.5 SERVICIOS HIGIÉNICOS
OE.1.1.2 INSTALACIONES PROVISIONALES
OE.1.1.2.1 ENERGÍA ELÉCTRICA PARA LA CONSTRUCCIÓN (GLB)
OE.1.1.2.2 DESAGÜE PARA LA CONSTRUCCIÓN (GLB)
OE.1.1.2.3 ENERGÍA ELÉCTRICA PROVISIONAL (GLB)
OE.1.1.3 TRABAJOS PRELIMINARES
OE.1.1.3.1 TRAZOS, NIVELES Y
OE.1.1.3.2 TRANSPORTE DE MATERIALES Y EQUIPOS
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.1 EXCAVACIONES
OE.2.1.2 RELLENOS
OE.2.1.2.1 RELLENO CON MATERIAL PROPIO
OE.2.1.2.3 ELIMINACIÓN DE MATERIAL EXCEDENTE
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.1 CIMIENTOS CORRIDOS
OE.2.2.1.1 SOLADOS
OE.2.2.2 SOBRECIMIENTO
OE.2.2.3 FALSO PISO
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.1 ZAPATAS
OE.2.3.2 VIGAS DE CIMENTACION
OE.2.3.3 COLUMNAS
OE.2.3.4 VIGAS
OE.2.3.5 LOSAS ALIGERADAS
OE.2.3.6 ESCALERA
OE.2.3.7 TANQUE ELEVADO
6.2 PARTIDAS DE ARQUITECTURA

OE.3.1 MUROS Y TABIQUES DE ALBAÑILERIA


OE.3.1.1 MUROS DE LADRILLO KING KONG DE ARCILLA
OE.3.1.3 MUROS DE LADRILLO PANDERETA DE ARCILLA
OE.3.1.15 BARANDAS Y PARAPETOS
OE.3.1.15.1 PARAPETOS
OE.3.2 REVOQUES Y REVESTIMIENTOS
OE.3.2.1 TARRAJEO RAYADO PRIMARIO
OE.3.2.2 TARRAJEO EN INTERIORES
OE.3.2.3 TARRAJEO EN EXTERIORES
OE.3.2.5 TARRAJEO EN COLUMNAS
OE.3.2.6 TARRAJEO EN VIGAS
OE.3.2.11 VESTIDURAS DE DERRAMES
OE.3.2.19 BRUÑAS
OE.3.2.20 TARRAJEO EN FONDO DE ESCALERA
OE.3.2.21 PREPARACIÓN DE GRADAS DE CONCRETO
OE.3.2.22 PREPARACIÓN DE DESCANSOS
OE.3.2.22 GRADAS ( ceramico)
OE.3.2.23 DESCANSOS (ceramico)
OE.3.2.24 ENCHAPES ( ceramico)
OE.3.3 CIELORRASOS
OE.3.3.3 CIELORRASO CON MEZCLA
OE.3.4 PISOS Y PAVIMENTOS
OE.3.4.2 PISOS
OE.3.4.2.17 PARQUET
OE.3.4.2.21 CERÁMICOS
OE.3.5 ZOCALOS Y CONTRAZÓCALOS
OE.3.5.2 CONTRAZOCALOS
OE.3.5.2.7 MADERA
OE.3.5.2.9 CERÁMICO
OE.3.6 COBERTURAS
OE.3.6.5 RECUBRIMIENTOS SOBRE ESTRUCTURAS DE MADERA, METAL,
ETC.
OE.3.7 CARPINTERIA DE MADERA
OE.3.7.1 PUERTAS
OE.3.7.2 VENTANAS
OE.3.7.4 MAMPARAS
OE.3.7.12 MUEBLES DE COCINA Y SIMILARES
OE.3.7.14 CLOSET
OE.3.8 CARPINTERÍA METÁLICA Y HERRERÍA
OE.3.8.8 CORTINAS ENROLLABLES DE FIERRO
OE.3.8.14 BARANDAS METÁLICAS
OE.3.9.CERRAJERIA
OE.3.9.1.BISAGRAS
OE.3.9.2.CERRADURAS
OE.3.9.3.SISTEMAS O MECANISMOS
OE.3.9.4.ACCESORIOS DE CIERRE
OE.3.10 VIDRIOS, CRISTALES Y SIMILARES
OE.3.10.1 ESPEJOS
OR.3.10.2 VIDRIOS,CRISTALES Y SIMILARES
OE.3.11 PINTURA
OE.3.11.1 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
OE.3.12 VARIOS, LIMPIEZA, JARDINERÍA
OE.3.12.1 LIMPIEZA PERMANENTE DE OBRA
OE.3.12.2 LIMPIEZA FINAL
OE.3.12.3 LIMPIEZA DE VIDRIOS
OE.3.12.4 ENCERADOS DE PISOS (parquet)
OE.3.12.6 TRABAJOS DE JARDINERÍA
OE.3.13 OTROS
OE.3.13.1 PODIO DE CONCRET
6.2.1 CIMENTACION:
• Se compone de zapatas conectadas mediante cimientos corridos y vigas de
cimentación.

6.2.2 CIMIENTOS CORRIDOS:


• Elementos de concreto ciclópeo que constituyen la base de cimentación de los
muros y conexión de zapatas.
• En cimientos corridos C:H - 1:10 con 30% de piedra grande (8" máx.).
• Metrado:
• Concreto: 25.35 m3

6.2.3 SOBRECIMIENTOS
• Constituye la parte de la cimentación que se construye encima de los cimientos
corridos y que sobresale de la superficie del terreno natural para recibir los
muros de albañilería, sirve de protección de la parte inferior de los muros y aísla
el muro contra la humedad o de cualquier otro agente externo.
• En sobrecimientos C:H - 1:8 con 25% de piedra mediana (6" máx.)
• Concreto: 3.39 m3
• Encofrado y desencofrado: 38.51 m2

6.2.4 FALSO PISO


• Es el concreto plano, de superficie rugosa, que se apoya directamente sobre el
suelo natural o en relleno y sirve de base a los pisos de la planta baja
• Metrado:
• Concreto: 88.64 m2

6.2.5 ZAPATAS
• Constituyen el cimiento de las columnas. Su ubicación y dimensiones están
determinadas en los planos respectivos. Son zapatas conectadas, a las que son
unidas por una o más vigas de cimentación.
• En la planta de cimentación se tiene 6 zapatas.
• Metrado:
• Concreto: 3.03 m3
• Encofrado y desencofrado: 13.4 m2
• Acero: kg
6.2.6 VIGAS DE CIMENTACIÓN
• Generalmente se diseñan para conectar a las zapatas, de manera que trabajen en
conjunto, pudiendo actuar como cimiento.
• Concreto: 3.39 m3
• Encofrado y desencofrado: 38.51 m2
• Acero: Ø 1/4" 74.88 kg y Ø 1/2" 340.12 kg

6.2.7 COLUMNAS:
• Están diseñadas para soportar las cargas verticales de la edificación, así como las
flexiones y cortes, con una resistencia a la compresión de F´c = 210 Kg / cm2.
Su ubicación y dimensiones están determinadas en los planos respectivos.
• METRADO
• Concreto: m3
• Encofrado y desencofrado: m2
• Acero: kg

6.2.8 VIGAS
• Las vigas son parte integrante del techo siendo vaciados conjuntamente con el
mismo, forma parte de las estructuras, siendo su función de portante y arrioste y
estará construida de Concreto Armado tipo F´c = 210 kg/cm2. Su ubicación y
dimensiones están determinadas en los planos respectivos.
• METRADO:
• Concreto: 14.92 m3
• Encofrado y desencofrado: 83.13 m2
• Acero: Ø1/4" 147.50 kg, Ø3/8" 15.36 kg, Ø1/2" 5534.82 kg, Ø5/8" 8438.67 kg.
6.2.9 LOSAS ALIGERADAS
• El espesor de la losa es de 20 cm. Son losas constituidas por viguetas de
concreto y elementos livianos de relleno. Las viguetas van unidas entre si por
una losa o capa superior de concreto. Los elementos de relleno están
constituidos por ladrillos, bloques huecos o elementos livianos que sirven para
aligerar el peso de la losa y además para conseguir una superficie uniforme de
cielorraso.
• METRADO
• Concreto: 5.72 m3
• Encofrado y desencofrado: 53.21 m2
• Acero: Ø 1/4" 319.44 kg, Ø 3/8" 790.64 kg , Ø 1/2" 224.93 kg.
• Ladrillos, bloques huecos o elementos livianos: 530 Und.

6.2.10 ESCALERAS
• Son estructuras diseñadas para vincular planos de distintos niveles, están
conformados por una serie de pasos o peldaños y eventuales descansos.
• Escalera 1 y 2:
• Concreto: 6.35 m3
• Encofrado y desencofrado: 39.28 m2
• Acero: Ø1/2" 444.34 kg y Ø 5/8" 133.62 kg
6.3 ARQUITECTURA

6.3.1 OE.3.1. MUROS Y TABIQUES DE ALBAÑILERIA


• Este rubro comprende la medición de muros y tabiques ejecutados con ladrillos de
cualquier calidad, bloques, piedra, etc. unidas entre si por juntas de mortero o ejecutados
con materiales semejantes y en cuya labor predominan las obras de albañilería.
Según nuestras especificaciones utilizaremos dos tipos de ladrillos: Ladrillo King Kong
(9X13X241:4, J=1.5 cm) y Ladrillo Pandereta (12x10x23,1:4, J=1.5 cm).

Unidad de medida (m2)


6.3.2 OE.3.1.1 MUROS DE LADRILLO KING KONG DE ARCILLA
• Es un tipo de ladrillo perforado (ya que tiene menos del 75% de sección neta de arcilla)
hecho a base de arcilla moldeada, y cocida en horno.
Es un ladrillo perforado con orificios perpendiculares a la superficie de asentado, y estos
en sus laterales tienen arcilla vertical. Son estos verticales de arcilla los que logran dar la
continuidad para transmitir la carga los elementos de abajo (vigas o cimientos).

Unidad de medida (m2)


• Metrado:
PRIMER PISO:126.054 m2

SEGUNDO PISO:121.326 m2

TERCER PISO: 126.324 m2

TOTAL:373.7055 m2

6.3.3 OE.3.1.2 MUROS DE LADRILLO PANDERETA


• Este tipo de muro no está hecho para soportar los diversos tipos de fuerzas presentes en
toda estructura: solo puede soportar su propio peso.
Al no soportar cargas verticales (ya que solo se debe construir para separar ambientes),
el ladrillo pandereta es ideal porque disminuye el peso del muro y los efectos sísmicos
sobre este.

Unidad de medida (m2)


• Metrado:
PRIMER PISO:126.0547m2
SEGUNDO PISO:117.756 m2
TERCER PISO: 126.324m2
TOTAL:370.135 m2

➔ TOTAL MUROS Y TABIQUERIA: 743.841 m2


6.3.4 OE.3.1.15 BARANDAS Y PARAPETOS
Se denomina baranda al elemento de altura adecuada para servir de protección de una escalera,
balcón, etc., y parapeto a una pared de baja altura, inferior a la altura de vista, que se construye para
evitar caídas en azoteas, terrazas, etc.
Unidad de Medida
total, de 33.22 m de barandas y total de 18.44 m2 de parapetos
Forma de medición
El cómputo de barandas y parapetos se obtendrá sumando las áreas parciales de los tramos.
Si las alturas se mantienen constantes puede efectuarse el cómputo en metros.

6.3.5 OE.3.2 REVOQUES Y REVESTIMIENTOS


• Consiste en la aplicación de mortero o pastas, en una o más capas sobre la superficie
exterior o interior de muros y tabiques, columnas, vigas o estructuras en bruto, con el fin
de vestir y formar una superficie de protección, impermeabilizar u obtener un mejor
aspecto en los mismos. Puede presentar capas lisas o ásperas. También comprende la
ejecución y vestidura de molduras, incluyendo el acabado de molduras de ladrillo.
Unidad de medida (m2)
6.3.6 OE.3.1.3 TARRAJEO RAYADO PRIMARIO
• Es cuando se hacen un acabado o tarrajeo de muros con una primera capa de mortero
súper plana y rayada, y con la segunda, se logra que las áreas queden perfectamente
planas, pero son visibles las aberturas, o elementos distintos que tengan como molduras.

Unidad de medida (m2)

• Metrado:
PRIMER PISO:150.868 m2
SEGUNDO PISO:130.361 m2
TERCER PISO:155.410m2
TOTAL:436.639 m2

6.3.7 OE.3.2.2. TARRAJEO EN INTERIORES


Comprende aquellos revoques constituidos por una sola capa de mortero, pero aplicada
en dos etapas. En la primera etapa llamada “pañeteo” se proyecta simplemente el mortero
sobre el paramento ejecutando previamente las cintas o maestras encima de las cuales se
corre una regla, luego cuando el pañeteo a endurecido se aplica la segunda capa para
obtener una superficie plana y acabada.
Unidad de medida (m2)

• Metrado:
PRIMER PISO:146.830m2
SEGUNDO PISO:119.875m2
TERCER PISO:156.336m2
TOTAL:423.041 m2

6.3.8 OE.3.2.3. TARRAJEO EN EXTERIORES


Se considera en partida aparte porque generalmente requiere de un andamiaje apropiado
para su ejecución. Sin embargo, el pañeteo no es usual en fachada.
Unidad de medida (m2)

• Metrado:
PRIMER PISO:27.670m2
SEGUNDO PISO:24.348m2
TERCER PISO:30.858m2
TOTAL:82.876 m2

6.3.9 OE.3.2.5 TARRAJEO EN COLUMNAS


Comprende la vestidura con mortero, de columnas de concreto y albañilería.
Unidad de Medida
Metro cuadrado (m2) para tarrajeo de superficies con un total 151,67 m2.
Forma de medición
Se encontrará el área total sumando el área efectivamente tarrajeada por columnas.
6.3.10 OE.3.2.6 TARRAJEO EN VIGAS
Comprende la vestidura con mortero de vigas de concreto. La superficie por vestir de la viga, es
la que queda visible bajo la losa.
Unidad de Medida
Metro cuadrado (m2) para tarrajeo de superficies con un total de 37.93 m2.
Forma de medición
Se computará el área total sumando el área efectivamente tarrajeada por viga.

6.3.11 OE.3.2.11 VESTIDURAS DE DERRAMES


Se llama vano a la abertura en un muro; si queda simplemente la abertura, el vano es libre, en
otros casos puede llevar una puerta o ventana. A la superficie cuya longitud es el perímetro del
vano y cuyo ancho es el espesor del muro, se le llama “derrame”.
Unidad de Medida
Metro (m) con un total de 277.63 m.
Forma de medición
Se medirá la longitud efectivamente ejecutada.
6.3.12 OE.3.2.19 BRUÑAS
Son canales de poca profundidad y espesor efectuados en el tarrajeo o revoque.
Unidad de Medida
Metro (m) con un total de 82.40 m.
Forma de medición
Para el metrado se determinará la longitud total de bruñas.

6.4 6.7.2 Revoques y revestimientos

Consiste en la aplicación de morteros o pastas, en una o más capas sobre la superficie


exterior o interior de muros y tabiques, columnas, vigas o estructuras en bruto, con el
fin de vestir y formar una superficie de protección, impermeabilizar u obtener un mejor
aspecto en los mismos. Puede presentar capas lisas o ásperas. También comprende la
ejecución y vestidura de molduras, incluyendo el acabado de molduras de ladrillo.

6.5 1.0 Tarrajeo en fondo de escalera:

Se denomina así a la aplicación de un mortero sobre la superficie inferior de las losas de


las escaleras.

Unidad de medida: (m2)


TOTAL: 34.174 m2
Metrado:

6.6 2.0 Preparación de gradas de concreto:

Comprende la aplicación de mortero sobre el concreto en los pasos y contrapasos,


dejándolos listos para recibir material pegado o acabado final.

Unidad de medida: (m)


TOTAL: 136.4 ml

Metrado:

6.7 3.0 Preparación de descansos:

Por descanso se entiende el piso horizontal en que desemboca o arranca un tramo de


escalera. El descanso lleva un tarrajeo previo al revestimiento dejando la superficie
rayada o lisa, preparada para recibir el revestimiento que constituye el acabado.

Unidad de medida: (m2)


Total: 1.71 m2

Metrado:
6.8 4.0 Gradas

Comprende la aplicación del acabado final en los pasos y contrapasos en las gradas de
las escaleras de concreto. Este acabado final puede ser de madera, vinílico, loseta,
cerámicos, etc.

Unidad de medida: (m)


Total: 161.1 ml

Metrado:

6.9 5.0 Descansos

Comprende la aplicación del acabado final en los descansos. Este acabado final puede
ser de madera, vinílico, loseta, cerámicos, etc.
Unidad de medida: (m2)
Total: 1.71 m2

Metrado:

6.10 6.0 Enchapes

Enchapes son los elementos que se pegan a los muros, cielorrasos, fondos de escaleras y
se colocan por razones de ornato o para un uso especial.

Unidad de medida: (m2)


Total, gradas: 161.1 ml
Total, descansos: 1.71 m2

Metrado:

*Para los enchapes de escalera utilizaremos Piso


Cerámico Cementicio Coto Plata 30x60cm caja:
1.44m2 y Rodo Paso Adhesivo Tabaco 35mm x 1metro.
6.11 7.0.0 CIELORRASOS
6.12 7.1.0 Cielorraso con mezcla
Se aplicará el mortero sobre la superficie inferior de losas de concreto que forman los
techos.
Metrado : 277.18 m2

6.13 8.0.0 PISOS Y PAVIMENTOS


6.14 8.1.0 Pisos
6.15 8.1.1 Parquet
El parquet es un material muy delicado que debe estar alejado de lugares húmedos ya
que a esta exposición la madera se hincharía y daría un mal aspecto. Por ende, se
colocará en el dormitorio principal.

Metrado : 12.44 m2
6.16 8.1.2 Cerámicos
Los cerámicos se enchaparán en los pisos del patio, cocina y baños tanto en el
1°piso,2°piso,3°piso y azotea.

Metrado: 19.94 m2

6.17 9.0.0 ZOCALOS Y CONTRAZÓCALOS


6.18 9.1.0 Contrazócalos
Se colocará para aislar el tabique de la superficie del piso y evitar el deterioro de
sus acabados.
6.19 9.1.1 Madera
Dormitorio principal
Metrado: 17.31 m

6.20 9.1.2 Cerámico


Patio
Cocina
Baño
Metrado: 51.40 m
6.21 10.0.0 Coberturas
6.22 10.1.0 Recubrimientos sobre estructuras de madera ,metal ,etc.
Esto se aplicara en las viguetas de madera que se encuentra en la azotea para mejorar las
características de este material ya que se encontrara exteriormente .

Metrado: 2.55 m2

6.23 6.7.1 PUERTAS


La unidad comprende el elemento en su integridad, es decir, incluyendo el marco, hoja,
jamba, junquillos, etc.; así como su colocación.
Según los planos de arquitectura, la partida de puertas constara de dos tipos:
APANELADA y CONTRAPLACADA.
- PUERTAS CONTRAPLACADAS E=45 MM C/TRIPLAY LUPUNA 4 MM
Metrado: 13.23 m2
- PUERTAS APANELADAS DE 4.5 MM DE CEDRO

Metrado: 24.85 m2
- PUERTA DE GARAGE EN CEDRO

Metrado: 5.71 m2

PUERTA PUERTA
CONTRAPLACADA APANELADA
PUERTA DE
GARAGE

6.24 6.7.2 VENTANAS


Son elementos que no permiten el tránsito, sino el paso de luz y ventilación.
- VENTANA DE MADERA CON HOJAS, CEDRO
Metrado: 57.87 m2
6.25 6.7.3 MAMPARAS
Llamamos mamparas al elemento de cristales o
vidrio provisto o no de marcos de madera que llega
hasta el piso, cerrando un vano o separando un
ambiente pudiendo tener o no una o más puertas.
- MAMPARA DE MADERA
Metrado: 10.80 m2

6.26 6.7.4 MUEBLES DE COCINA Y SIMILARES


Se refiere a los muebles que van en la cocina, laboratorios, etc., a una altura adecuada.
La unidad comprende el mueble terminado y colocado, incluyendo el suministro y
colocación de la cerrajería.
- MUEBLE BAJO DE COCINA MELAMINA C/TABLERO POSTFORMADO PUERTA
MELAMINA H=0.80 A=0.60 M

Metrado: 7.71 ml
- MUEBLE ALTO DE COCINA MELAMINA PUERTA MELAMINA H=0.60
A=0.32 M
Metrado: 4.75 ml
6.27 6.7.5 CLOSET
Se refiere a la vestidura total del closet incluidas sus puertas. La unidad comprende el
revestimiento de los muros, la cajonería en anaqueles, perchas, barras para colgar,
bastidores para zapatos, etc., así como el suministro y colocación de cerrajería.
- CLOSETDEMELAMINE e=18mm
Metrado: 9 Und.

6.28 6.8 CARPINTERÍA METÁLICA Y HERRERÍA

6.29 6.8.1 CORTINAS ENROLLABLES DE FIERRO


Son puertas o ventanas que se abren y cierran enrollándose sobre un -eje pudiendo
llevar láminas que cierran completamente el vano o elementos que permitan observar al
otro lado, lo que se denomina «tipo exposición». La unidad incluye postigos, puerta,
parantes.
Metrado: 6.58 m2
6.30 6.9 CERRAJERIA

6.31 6.9.1 BISAGRAS


Es el cómputo de dos planchitas de metal articuladas, sujetas al marco (o elemento fijo)
y a la hoja (o elemento batiente) respectivamente. Sirve generalmente para cerrar y abrir
una puerta, ventana, etc., a un solo lado.
- BISAGRA TIPO CAPUCHINA ALUMINIZADA 3"
Metrado: 70 Und.

6.32 6.9.2 BISAGRAS


Son mecanismos que sirven para asegurar el cierre de puertas.
- CERRADURA PUERTA PRINCIPAL PESADA
Metrado: 1 Und.
- CERRADURA P/BAÑO BRONCE ANTIGUO
Metrado: 7 Und.
- CERRADURA PARA PUERTA INTERIOR BRONCE ANTIGUO
Metrado: 15 Und.
6.33 6.9.3 SISTEMAS O MECANISMOS
Son elementos más perfeccionados que sirven para facilitar el movimiento de las hojas y su
seguridad.
La partida contara con un sistema levadizo para puerta de cochera.

Unidad de medida: (Und.)


Total: 1 und.

6.34 6.10 VIDRIOS, CRISTALES Y SIMILARES


Comprende la provisión y colocación de vidrios,
cristales, vitraux, etc.; para puertas, ventanas,
mamparas y otros elementos donde se especifica el
espesor, calidad, tipo, etc. incluyendo a la unidad
todos los elementos necesarios para su fijación,
como ganchos, masilla, junquillos, etc.
- VIDRIOS INCOLOROS 6mm
Metrado: 68.67 m2
6.35 6.10.1 BLOQUES DE VIDRIO
Son piezas de vidrio, acrílico o similar, que se colocan
generalmente para permitir una mejor iluminación de
ambientes o eventualmente decorativos.

- Bloque de vidrio Lineal 19 x 19 cm


Metrado: 126 Und.

6.36 6.11 PINTURA


Comprende todos los materiales y mano de obra necesarios para la ejecución de los
trabajos de pintura en la obra (paredes, cielorrasos, contrazócalos, revestimientos,
carpintería, etc.). Las partidas serán diferenciadas según el tipo de pintura y calidad de
la pintura y el acabado especificado. El análisis de precios unitarios incluirá la
preparación de la superficie, la imprimación, la clase de pintura, el número manos y la
provisión de todos los materiales requeridos, así como la mano de obra.

6.37 6.11.1 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES


Todas las áreas de los elementos considerados serán pintados con pintura Pintura
Tekno latex teknocolor Atlantis 1 galón
- Cielo Raso
Metrado: 277.18 m2
- En interiores
Metrado: 423.04 m2
- En exteriores
Metrado: 82.88 m2
- Columnas
Metrado: 151.67 m2 - Vigas
Metrado: 37.93 m2

TOTAL: 972.70 m2
6.38 6.11.2 PUERTAS
Las áreas de pintado corresponderán a las dos caras de las puertas.
Todas las puertas del tipo Apanelada, serán laqueadas con Pintura Tekno Barniz Doble
Acción Transparente 1 gl
Metrado: 30.58 m2

6.39 6.2 Tanques elevados

Son depósitos construidos en zonas elevadas de las edificaciones y que se


utilizan para el almacenamiento de agua. La estructura de los tanques, está
constituida generalmente por columnas, vigas, muros laterales, losas de fondo
y tapa o losa superior.

Unidad de medida para el concreto: (m3)


Total: 1.7487 m3

Metrado:

Para encofrado y desencofrado: (m2)


Total: 31.72 m2
6.40 OE.3.12.4 .ENCERADO DE PISOS PARQUET
Unidad de medida (m2)

• Metrado:
PRIMER PISO:53.233m2

SEGUNDO PISO:53.958m2

TERCER PISO:65.078m2

TOTAL:172.270 m2

6.41 6.3 Trabajos de jardinería

Comprende los trabajos de jardinería en general como sembrío de setos,


macizos, plantas, árboles, etc. En todos los casos se especificará la especie de
la planta a sembrar.

Unidad de medida: (m)


Total (m) : 8.5
Total (Glb): 5

Metrado:
*Utilizaremos 5 plantas ornamentales para nuestro jardín y setos (fotina
enana) de 4.7m.
7 PLANOS
7.1 PLANOS DE ARQUITECTURA
7.2 PLANOS DE LEVACION
7.3 PLANO DE ESTRUCTURA DE ALIGERADO
7.4 PLANO DE ESTRUCTURA DE CIMENTACION

8 PLANILLA DE METRADO
PRESUSPUESTO
ESPECIALIDAD: ESTRUCTURAS
OBRA: HOJA N°1
CLIENTE: FECHA: 7/10/2021
UBICACIÓN:

DESCRIPCION UND METRADO PRECIO


O.E 1 OBRAS PROVISONALES, TRABAJOS PRE ELIMINARES, SEGURIDAD Y SALUD
O.E 1.1 OBRAS PROVISONALES YTRABAJOS PRE ELIMINARES
O.E 1.1.1 CONSTRUCCIONES PROVISIONALES
O.E 1.1.1.1 OFICINAS m2 8.64
O.E 1.1.1.2 ALMACENES m2 12.42
O.E 1.1.1.6 SERVICIOS HIGIÉNICOS m2 1.44
O.E 1.1.1.7 CERCOS m2 40.80
O.E 1.1.2 INSTALACIONES PROVISIONSALES
O.E 1.1.2.1 AGUA PARA CONSTRUCCION glb 1.00
O.E 1.1.2.2 DESAGUE PARA CONSTRUCCION glb 1.00
O.E 1.1.2.3 ENERGIA ELECTRICA PROVISIONAL glb 1.00
O.E 1.1.3 TRABAJOS PRE ELIMINARES
O.E 1.1.3.1 TRAZOS, NIVELES Y/REPLANTEO m2 11.89
O.E 1.1.3.2 TRANPORTE DE MATERIALES Y EQUIPO glb 1.00
O.E 2 ESTRUCTURAS
O.E 2.1 MOVIMIENTO DE TIERRAS
O.E 1 OBRAS PROVISONALES, TRABAJOS PRE ELIMINARES, SEGURIDAD Y SALUD
O.E 1.1 OBRAS PROVISONALES YTRABAJOS PRE ELIMINARES
O.E 1.1.1 CONSTRUCCIONES PROVISIONALES
O.E 1.1.1.1 OFICINAS m2 8.64
O.E 1.1.1.2 ALMACENES m2 12.42
O.E 1.1.1.6 SERVICIOS HIGIÉNICOS m2 1.44
O.E 1.1.1.7 CERCOS m2 40.80
O.E 1.1.2 INSTALACIONES PROVISIONSALES
O.E 1.1.2.1 AGUA PARA CONSTRUCCION glb 1.00
O.E 1.1.2.2 DESAGUE PARA CONSTRUCCION glb 1.00
O.E 1.1.2.3 ENERGIA ELECTRICA PROVISIONAL glb 1.00
O.E 1.1.3 TRABAJOS PRE ELIMINARES
O.E 1.1.3.1 TRAZOS, NIVELES Y/REPLANTEO m2 11.89
O.E 1.1.3.2 TRANPORTE DE MATERIALES Y EQUIPO glb 1.00
O.E 2 ESTRUCTURAS
O.E 2.1 MOVIMIENTO DE TIERRAS
O.E 2.1.1 EXCAVACIONES
O.E 2..1.1.1 EXCAVACIONES DE ZANJAS PARA CIMIENTOS m3 52.90
O.E 2.1.2 RELLENOS
O.E 2.1.2.1 RELLENO CON MATERIAL PROPIO 9.75
O.E 2.1.3 NIVELACION INTERIOR APISONADO MANUAL 0.00
O.E 2.1.4 ELIMINACION DE MATERIAL EXCEDENTE m3 806.30
O.E 2.2 OBRAS DE COMCRETO SIMPLE
O.E 2.2.1 CIMIENTOS CORRIDOS m3 25.35
O.E 2.2.1.1 SOLADO m3 7.27
O.E 2.2.2 SOBRECIMIENTO
O.E 2.2.1.1 PARA EL CONCRETO f'c=210kg/cm2 m3 3.39
O.E 2.2.1.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 38.51
O.E 2.2.3 Falso piso mezcla m2 88.65
O.E 2.3 OBRAS DE CONCRETO ARMADO
O.E 2.3.1 ZAPATAS
O.E 2.3.1.1 CONCRETO m3 3.03
O.E 2.3.1.2 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 13.40
O.E 2.3.1.3 ACERO DE ZAPATA kg 0.00
O.E 2.3.2 VIGAS DE CIMIENTACION
O.E 2.3.2.1 PARA EL CONCRETO f'c=210kg/cm2 m3 3.66
O.E 2.3.2.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 50.53
O.E 2.3.2.3 ACERO DE CIMENTACION kg 0.00
O.E 2.3.1 COLUMNAS
O.E 2.3.3.1 CONCRETO DE COLUMNA m3 46.29
O.E 2.3.3.2 Encofrado de columnas m2 489.87
O.E 2.3.3.3 ACERO kg
O.E 2.3.2 VIGAS
O.E 2.3.2.1 CONCRETO EN VIGAS f'C=210 kg/cm2 m3 14.92
O.E 2.3.2.2 ENCONFRADO Y DESECONFRADO NORMAL EN VIGAS m2 83.13
O.E 2.3.2.3 ACERO f'=4,200 kg/cm2 kg
O.E 2.3.3 LOSAS ALIGERADAS
O.E 2.3.3.1 Losa aligerada de f'c=200 Kg/cm² m³ 5.73
O.E 2.3.3.2 Encofrado y desencofrado de losa aligerada m² 53.22
O.E 2.3.3.3 LADRILLO PARA TECHO PISO 1 - 2 -3 - 4 m² 529.36
O.E 2.3.3.4 ACERO DE LOSA kg
O.E 2.3.4 ESCALERA
O.E 2.3.4.1 PARA EL CONCRETO f'c=210kg/cm2 m3 6.35
O.E 2.3.4.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 39.28
O.E 2.3.4.3 ACERO DE ESCALERA kg
O.E 2.3..5 TANQUE ELEVADO
O.E 2.3..5.1 PARA EL CONCRETO f'c=210kg/cm2 m3 1.69
O.E 2.3..5.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 31.72
O.E 2.3..5.3 ACERO DE ESCALERA kg
PRESUPUESTO
ESPECIALIDAD: ARQUITECTURA
OBRA:
CLIENTE: HOJA N°2
UBICACIÓN: FECHA: 07/10/2021

DESCRIPCION UND METRADO PRECIO


ARQUITECTURA
OE.3.1 MUROS Y TABIQUES DE ALBAÑILERIA
OE.3.1.1 MUROS DE LADRILLO KING KONG DE ARCILLA m2 590.07
OE.3.1.3 MUROS DE LADRILLO PANDERETA DE ARCILLA m2 590.07
OE.3.1.15 BARANDAS Y PARAPETOS m 33.22
OE.3.1.15.1 PARAPETOS m2 18.41
OE.3.2 REVOQUES Y REVESTIMIENTOS
OE.3.2.1 TARRAJEO RAYADO PRIMARIO 436.64
OE.3.2.2 TARRAJEO EN INTERIORES 643.81
OE.3.2.3 TARRAJEO EN EXTERIORES 82.88
OE.3.2.5 TARRAJEO EN COLUMNAS m2 151.67
OE.3.2.6 TARRAJEO EN VIGAS m2 37.93
OE.3.2.11 VESTIDURAS DE DERRAMES m 277.63
OE.3.2.19 BRUÑAS m 82.40
OE.3.2.20 TARRAJEO EN FONDO DE ESCALERA m2 34.17
OE.3.2.21 PREPARACIÓN DE GRADAS DE CONCRETO ml 136.40
OE.3.2.22 PREPARACIÓN DE DESCANSOS m2 1.71
OE.3.2.22 GRADAS ( ceramico) ml 161.10
OE.3.2.23 DESCANSOS (ceramico) m2 1.71
OE.3.2.24 ENCHAPES ( ceramico) m2 161.10
OE.3.3 CIELORRASOS
OE.3.3.3 CIELORRASO CON MEZCLA m2 277.19
OE.3.4 PISOS Y PAVIMENTOS
OE.3.4.2 PISOS
OE.3.4.2.17 PARQUET m2 12.44
OE.3.4.2.21 CERÁMICOS m2 19.94
OE.3.5 ZOCALOS Y CONTRAZÓCALOS
OE.3.5.2 CONTRAZOCALOS
OE.3.5.2.7 MADERA m 17.31
OE.3.5.2.9 CERÁMICO m 51.40
OE.3.6 COBERTURAS
OE.3.6.5 RECUBRIMIENTOS SOBRE ESTRUCTURAS DE MADERA,m2 METAL, ETC.
2.55
OE.3.7 CARPINTERIA DE MADERA
OE.3.7.1 PUERTAS m2 43.81
OE.3.7.2 VENTANAS m2 57.87
OE.3.7.4 MAMPARAS m2 10.80
OE.3.7.12 MUEBLES DE COCINA Y SIMILARES m 14.86
OE.3.7.14 CLOSET Und. 9.00
OE.3.8 CARPINTERÍA METÁLICA Y HERRERÍA
OE.3.8.8 CORTINAS ENROLLABLES DE FIERRO m2 2.80
OE.3.8.14 BARANDAS METÁLICAS
OE.3.9.CERRAJERIA
OE.3.9.1.BISAGRAS Unid. 70.00
OE.3.9.2.CERRADURAS Und. 23.00
OE.3.9.3.SISTEMAS O MECANISMOS Und. 1.00
OE.3.9.4.ACCESORIOS DE CIERRE
OE.3.10 VIDRIOS, CRISTALES Y SIMILARES m2 68.67
OE.3.10.1 ESPEJOS Und. 6.00
VIDRIOS,CRISTALES Y SIMILARES Und. 126.00
OE.3.11 PINTURA
OE.3.11.1 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
m2 466.78
OE.3.12 VARIOS, LIMPIEZA, JARDINERÍA
OE.3.12.1 LIMPIEZA PERMANENTE DE OBRA Glb 1.00
OE.3.12.2 LIMPIEZA FINAL Glb 1.00
OE.3.12.3 LIMPIEZA DE VIDRIOS m2 79.92
OE.3.12.4 ENCERADOS DE PISOS (parquet) m2 12.44
OE.3.12.6 TRABAJOS DE JARDINERÍA m2 5.10
PRESUSPUESTO
ESPECIALIDAD: ESTRUCTURAS
OBRA: HOJA N°3
CLIENTE: FECHA: 7/10/2021
UBICACIÓN:

MEDIDAS PARCIA
N° DE PARTIDA DESCRIPCION UND N° DE VECES TOTAL
LONG. ANCHO ALTO L
O.E 1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.
O.E 1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
O.E 1.1.1 CONSTRUCCIONES PROVISIONALES
O.E 1.1.1.1 OFICINAS m2 8.64
Patio de entrada 1 3.6 2.4 8.64
O.E 1.1.1.2 ALMACENES m2 12.42
Patio de entrada 1 4.5 2.76 12.42
O.E 1.1.1.6 SERVICIOS HIGIÉNICOS m2 1.44
Patio de entrada 1 1.2 1.2 1.44
O.E 1.1.1.7 CERCOS m2 40.8
Patio de entrada 1 17 2.4 40.8
O.E 1.1.2 INSTALACIONES PROVICIONALES
O.E 1.1.2.1 AGUA PARA CONSTRUCCION glb 1.00
1 1
O.E 1.1.2.2 DESAGUE PARA CONSTRUCCION glb 1.00
1 1
O.E 1.1.2.3 ENERGIA ELECTRICA PROVISIONAL glb 1.00
1 1
O.E 1.1.3 TRABAJOS PRELIMINARES
O.E 1.1.3.1 TRAZOS, NIVELES Y/REPLANTEO m2 11.89
ZAPATA Z-1 2 1.20 1.20 2.88
ZAPATA Z-2 3 1.10 1.10 3.63
ZAPATA Z-3 1.10 0.90 0.99
ESCALERA 1 1.10 0.50 0.55
ESCALERA 2 0.95 0.50 0.48
TANQUE ELEVADO 2.10 1.60 3.36

O.E 1.1.3.2 TRANPORTE DE MATERIALES Y EQUIPO glb 1.00


1 1.00
O.E 2 ESTRUCTURAS
O.E 2.1 MOVIMIENTO DE TIERRAS
O.E 2.1.1 EXCAVACIONES
O.E 2..1.1.1EXCAVACIONES DE ZANJAS PARA CIMIENTOS m3 52.90
z-1 2 1.20 1.00 1.5 3.60
z-2 3 1.10 1.00 1.5 4.95
EJE A/9-1 2 15.00 0.50 1.25 18.75
EJE C/9-8 1 1.15 0.50 1.25 0.72
EJE C/3 1 1.85 0.50 1.25 1.16
EJE D/1-4 1 5.63 0.50 1.25 3.52
EJE E/9-8 1 2.93 0.50 1.25 1.83
EJE 9/A-C 2 2.75 0.50 1.25 3.44
EJE 9/C-E 2 0.98 0.50 1.25 1.23
EJE 9/C-F 4 1.68 0.50 1.25 4.20
EJE 7/F-E 1 2.37 0.50 1.25 1.48
EJE 5/F-E 1 2.49 0.50 1.25 1.56
EJE 4/F-D 2 2.28 0.50 1.25 2.85
EJE E/8-5 1 2.90 1.25 3.63
O.E 2.1.2 RELLENOS
O.E 2.1.2.1 RELLENO CON MATERIAL PROPIO 9.75
z-1 2 1.20 0.90 0.60 1.30
z-2 3 1.10 0.40 0.60 0.79
EJE A/9-1 2 15.00 0.35 0.30 3.15
EJE C/9-8 1 1.15 0.35 0.30 0.12
EJE C/3 1 1.85 0.35 0.30 0.19
EJE D/1-4 1 5.63 0.35 0.30 0.59
EJE E/9-8 1 2.93 0.35 0.30 0.31
EJE 9/A-C 2 2.75 0.35 0.30 0.58
EJE 9/C-E 2 0.98 0.35 0.30 0.21
EJE 9/C-F 4 1.68 0.35 0.30 0.71
EJE 7/F-E 1 2.37 0.35 0.30 0.25
EJE 5/F-E 1 2.49 0.35 0.30 0.26
EJE 4/F-D 2 2.28 0.35 0.30 0.48
EJE E/8-5 1 2.75 0.30 0.825

O.E 2.1.4 ELIMINACION DE MATERIAL EXCEDENTE m3 806.30 806.30


V.EXC = 52.90
V. RELL = 9.75
E = 1.25
C = 0.8
O.E 2.2 OBRAS DE CONCRETO SIMPLE
O.E 2.2.1 CIMIENTOS CORRIDOS m3 25.35
Eje 1-1 /A-F 1 8 0.5 0.8 3.2
(-c13 y c11) 2 0.15 0.3 0.8 -0.072
(-c2) 1 0.15 0.15
Eje 1-3/B-D 1 1.25 0.5 0.8 0.5
Eje 4-4/D-F 1 2.05 0.5 0.8 0.82
(-c10) 2 0.3 0.15 0.8 -0.072
Eje 3-4/A-B 1 2.6 0.5 0.8 1.04
(-c8) 1 0.4 0.15 0.8 -0.048
(-c7) 1 0.6 0.15 0.8 -0.072
Eje 5-5/D-F 1 2.05 0.5 0.8 0.82
(-c10) 2 0.3 0.15 0.8 -0.072
Eje 7-7/C-F 1 3.3 0.5 0.8 1.32
(-c12) 1 0.32 0.15 0.8 -0.038
(-c11) 1 0.3 0.15 0.8 -0.036
(-c10) 2 0.15 0.3 0.8 -0.072
(-c14) 1 0.25 0.15 0.8 -0.03
Eje 8-8/A-C 1 3.9 0.5 0.8 1.56
Eje 8-8/C-F 1 2.5 0.5 0.8 1
(-c5) 1 0.51 0.15 0.8 -0.061
(-c10) 2 0.15 0.3 0.8 -0.072
Eje 9-9/A-C 1 3.62 0.5 0.6 1.086
(-c14) 2 0.25 0.15 0.6 -0.045
Eje 9-9/C-E 1 1.8 0.5 0.8 0.72
(-c3) 1 0.3 0.3 0.8 -0.072
Eje 9-9/E-F 1 2.5 0.5 0.8 1
(-c11) 1 0.3 0.15 0.8 -0.036
(-c10) 2 0.3 0.15 0.8 -0.072
Eje A-A/9-8 1 1.86 0.5 0.6 0.558
Eje A-A/8-7 1 3.23 0.5 0.8 1.292
(-c11) 1 0.3 0.15 0.8 -0.036
Eje A-A/4-6 1 3.57 0.5 0.8 1.428
(-c9) 1 0.42 0.15 0.8 -0.05
Eje A-A/3-1 1 3.84 0.5 0.8 1.536
(-c14) 1 0.15 0.25 0.8 -0.03
Eje E-E/9-8 1 1.46 0.5 0.8 0.584
Eje C-C/2-5 1 2.8 0.5 0.8 1.12
Eje D-D/2-5 1 3.17 0.5 0.8 1.268
Eje D-D/1-2 1 2.18 0.5 0.8 0.872
Eje F-F/1-4 1 4.16 0.5 0.8 1.664
(-c11) 1 0.3 0.15 0.8 -0.036
Eje F-F/4-5 1 0.68 0.5 0.8 0.272
Eje F-F/5-7 1 2.72 0.5 0.8 1.088
(-c9) 1 0.42 0.15 0.8 -0.05
Eje F-F/7-8 1 1.7 0.5 0.8 0.68
Eje F-F/8-9 1 2.11 0.5 0.8 0.844
2.2.1.1 SOLADO m3 7.27
Z2 4 1.1 1.1 4.84
Z3 1 1.1 0.9 0.99
Z1 1 1.2 1.2 1.44
O.E 2.2.2 SOBRECIMIENTO
O.E 2.2.1.1 PARA EL CONCRETO f'c=210kg/cm2 m3 3.39
Eje A, entre los ejes 1 y 9; CC-8, CC-1 y CC-7 1 11.97 0.15 0.3 0.54
Eje B, entre los ejes 1 y 4; CORTE A 1 4.31 0.15 0.1 0.06
Eje D, entre los ejes 1 y 5; CC-2 1 1.45 0.3 0.43
Eje E, entre los ejes 7 y 8; CC-3 1 0.32 0.4 0.13
Eje E, entre los ejes 8 y 9; CC-2 1 1.50 0.15 0.3 0.07
Eje F, entre los ejes 1 y 9; CC-1 y CC-6 1 11.93 0.15 0.3 0.54
Eje 1, entre los ejes B y D; CC-1 1 1.10 0.15 0.3 0.05
Eje 4, entre los ejes D y F; CC-2 1 1.75 0.15 0.3 0.08
Eje 5, entre los ejes D y F; CC-2 1 0.31 0.3 0.09
Eje 7, entre los ejes C y F; CC-3 1 0.27 0.4 0.11
Eje 7, entre los ejes E y F; CORTE E 1 0.80 0.15 0.2 0.02
Eje 8, entre los ejes A y C; CC-2 1 3.35 0.15 0.3 0.15
Eje 8, entre los ejes E y F; CC-3 1 2.05 0.15 0.4 0.82
Eje 9, entre los ejes A y F; CC-1 y CC-7 1 6.67 0.15 0.3 0.30
O.E 2.2.1.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 38.51
Eje A, entre los ejes 1 y 9; CC-8, CC-1 y CC-7 1 25.73 0.3 7.72
Eje B, entre los ejes 1 y 4; CORTE A 1 9.22 0.1 0.92
Eje D, entre los ejes 1 y 5; CC-2 1 18.99 0.3 5.70
Eje E, entre los ejes 7 y 8; CC-3 1 4.44 0.4 1.78
Eje E, entre los ejes 8 y 9; CC-2 1 3.30 0.3 0.99
Eje F, entre los ejes 1 y 9; CC-1 y CC-6 1 25.96 0.3 7.79
Eje 1, entre los ejes B y D; CC-1 1 2.50 0.3 0.75
Eje 4, entre los ejes D y F; CC-2 1 3.80 0.3 1.14
Eje 5, entre los ejes D y F; CC-2 1 4.40 0.3 1.32
Eje 7, entre los ejes C y F; CC-3 1 4.17 0.4 1.67
Eje 7, entre los ejes E y F; CORTE E 1 1.75 0.2 0.35
Eje 8, entre los ejes A y C; CC-2 1 4.40 0.3 1.32
Eje 8, entre los ejes E y F; CC-3 1 7.00 0.4 2.80
Eje 9, entre los ejes A y F; CC-1 y CC-7 1 14.24 0.3 4.27
O.E 2.2.3 Falso piso mezcla m2 88.65
Terraza 1 1 2.15 0.3 0.645
Terraza 2 1 2.6 1.55 4.03
Estudio 1 1 2.35 0.8 1.88
Estudio 2 1 1.65 2.2 3.63
Patio 1 1 2.35 1.5 3.525
Patio 2 1 1.6 0.7 1.12
Comedor 1 1 0.66 0.15 0.099
Comedor 2 1 2.55 0.21 0.5355
Comedor 3 1 2.7 1.13 3.051
Comedor 4 1 7.4 1.4 10.36
Comedor 5 1 7.04 1.4 9.856
Comedor 6 1 5.46 1.93 10.538
Jardin 1 1 2.3 0.5 1.15
Jardin 2 1 3 0.6 1.8
Estacionamiento 1 1 1.95 0.15 0.2925
Estacionamiento 2 1 2.2 4.4 9.68
Estacionamiento 3 1 4.7 0.3 1.41
Ingreso 1 1 0.68 0.45 0.306
Ingreso 2 1 0.9 0.15 0.135
Ingreso 3 1 4.85 1.04 5.044
Baño 1 1 0.7 0.15 0.105
Baño 2 1 2.15 0.95 2.0425
Baño 3 1 0.7 0.15 0.105
Baño 4 1 1.75 1 1.75
Tienda 1 1 0.7 0.15 0.105
Tienda 2 1 6.3 0.9 5.67
Tienda 3 1 5.15 1.9 9.785
O.E 2.3 OBRAS DE CONCRETO ARMADO
O.E 2.3.1 ZAPATAS
O.E 2.3.1.1 CONCRETO m3 3.03
Z2 3 1.1 1.1 0.5 1.815
Z3 1 1.1 0.9 0.5 0.495
Z1 1 1.2 1.2 0.5 0.72
O.E 2.3.1.2 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 13.4
Z2 4 1.1 2 8.8
Z3 1 1.1 2 2.2
Z1 1 1.2 2 2.4
O.E 2.3.1.3 ACERO DE ZAPATA kg

O.E 2.3.2 VIGAS DE CIMIENTACION


O.E 2.3.2.1 PARA EL CONCRETO f'c=210kg/cm2 m3 3.66
Eje A, entre los ejes 1 y 9; CC-8, CC-1 y CC-7 1 11.97 0.15 0.3 0.54
Eje B, entre los ejes 1 y 4; CORTE A 1 4.31 0.15 0.3 0.19
Eje C, entre los ejes 8 y 9; CC-4 1 2.15 0.15 0.3 0.10
Eje D, entre los ejes 1 y 5; CC-2 1 1.45 0.3 0.43
Eje E, entre los ejes 7 y 8; CC-3 1 0.32 0.3 0.10
Eje E, entre los ejes 8 y 9; CC-2 1 1.50 0.15 0.3 0.07
Eje F, entre los ejes 1 y 9; CC-1 y CC-6 1 11.93 0.15 0.3 0.54
Eje 1, entre los ejes A y D; CC-5 1 3.65 0.15 0.3 0.16
Eje 1, entre los ejes B y D; CC-1 1 1.10 0.15 0.3 0.05
Eje 1, entre los ejes D y F; CC-5 1 2.80 0.15 0.3 0.13
Eje 4, entre los ejes D y F; CC-2 1 1.75 0.15 0.3 0.08
Eje 5, entre los ejes D y F; CC-2 1 0.31 0.3 0.09
Eje 7, entre los ejes C y F; CC-3 1 0.27 0.3 0.08
Eje 7, entre los ejes E y F; CORTE E 1 0.80 0.15 0.3 0.04
Eje 8, entre los ejes A y C; CC-2 1 3.35 0.15 0.3 0.15
Eje 8, entre los ejes E y F; CC-3 1 2.05 0.15 0.3 0.62
Eje 9, entre los ejes A y F; CC-1 y CC-7 1 6.67 0.15 0.3 0.30
O.E 2.3.2.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 50.53
Eje A, entre los ejes 1 y 9; CC-8, CC-1 y CC-7 2 11.97 0.3 7.18
Eje B, entre los ejes 1 y 4; CORTE A 2 4.31 0.3 2.59
Eje C, entre los ejes 8 y 9; CC-4 2 2.15 0.3 1.29
Eje D, entre los ejes 1 y 5; CC-2 2 17.94 0.3 10.77
Eje E, entre los ejes 7 y 8; CC-3 2 4.14 0.3 2.48
Eje E, entre los ejes 8 y 9; CC-2 2 1.50 0.3 0.90
Eje F, entre los ejes 1 y 9; CC-1 y CC-6 2 11.93 0.3 7.16
Eje 1, entre los ejes A y D; CC-5 2 3.65 0.3 2.19
Eje 1, entre los ejes B y D; CC-1 2 1.10 0.3 0.66
Eje 1, entre los ejes D y F; CC-5 2 2.80 0.3 1.68
Eje 4, entre los ejes D y F; CC-2 2 1.75 0.3 1.05
Eje 5, entre los ejes D y F; CC-2 2 4.25 0.3 2.55
Eje 7, entre los ejes C y F; CC-3 2 3.87 0.3 2.32
Eje 7, entre los ejes E y F; CORTE E 2 0.80 0.3 0.48
Eje 8, entre los ejes A y C; CC-2 2 3.35 0.3 2.01
Eje 8, entre los ejes E y F; CC-3 2 2.05 0.3 1.23
Eje 9, entre los ejes A y F; CC-1 y CC-7 2 6.67 0.3 4.00
O.E 2.3.2.3 ACERO DE CIMENTACION

O.E 2.3.3 COLUMNAS


O.E 2.3.3.1. CONCRETO DE COLUMNA m3 46.29
1°PISO Forma cilindrica Radio(m) 18.38
C-1 1 0.21 3.05 0.42
C-2 2 0.15 3.05 0.43

C-3 3 0.30 3.80 0.30 1.03


C-4 1 0.825 3.80 0.15 0.47
C-5 1 0.15 3.90 0.51 0.30
C-6 1 0.51 3.80 0.15 0.29
C-7 1 0.15 3.80 0.60 0.34
C-8 1 0.15 4.10 0.40 0.25
C-9 2 0.15 3.80 0.42 0.48
C-10 6 0.0675 3.80 1.54
C-11 8 0.15 3.80 0.30 1.37
C-12 1 0.34 3.90 0.15 0.20
C-13 1 0.15 3.90 0.30 0.18
C-14 3 0.15 3.90 0.25 0.44
C-14 (CC7) 3 0.15 3.70 0.25 0.42

2°PISO 11.38
Forma cilindrica Radio(m)
C-1 1 0.21 2.55 0.35
C-2 2 0.15 2.55 0.36

C-3 3 0.30 2.55 0.30 0.69


C-5 1 0.15 2.55 0.51 0.20
C-6 1 0.15 2.55 0.375 0.14
C-7 1 0.15 2.55 0.30 0.11
C-9 2 0.15 2.55 0.42 0.32
C-10 6 0.0675 2.55 1.03
C-11 8 0.15 2.55 0.30 3.06
C-13 1 0.15 2.55 0.30 0.11
3°PISO 9.63
Forma cilindrica Radio(m)
C-2 2 0.15 2.55 0.36

C-1 1 0.3 2.55 0.3 0.72


C-3 3 0.30 2.55 0.30 0.69
C-5 1 0.15 2.55 0.51 0.20
C-6 1 0.15 2.55 0.375 0.14
C-7 1 0.15 2.55 0.30 0.11
C-9 2 0.15 2.55 0.42 0.32
C-10 6 0.0675 2.55 1.03
C-11 8 0.15 2.55 0.30 3.06
C-13 1 0.15 2.55 0.30 0.11

AZOTEA 6.89
Forma cilindrica Radio(m)
C-2 2 0.15 2.55 0.36

C-3 3 0.30 2.55 0.30 0.69


C-5 1 0.15 2.55 0.51 0.20
C-10 6 0.0675 2.55 1.03
C-11 8 0.15 2.55 0.30 3.06
C-13 1 0.15 2.55 0.30 0.11

O.E 2.3.3.2 Encofrado de columnas 489.87


1°PISO Forma cilindrica Radio(m) 188.67
C-1 m2 1 2.55 0.42 3.36
C-2 m2 2 2.55 0.3 4.80

C-3 m2 3 2.55 1.20 9.18


C-4 m2 1 2.55 1.95 4.97
C-5 m2 1 2.55 1.32 3.37
C-6 m2 1 2.55 1.32 3.37
C-7 m2 1 2.55 1.50 3.83
C-8 m2 1 2.55 1.10 2.81
C-9 m2 2 2.55 1.14 5.81
C-10 m2 6 2.55 0.9 13.77
C-11 m2 8 2.55 0.9 18.36
C-12 m2 1 2.55 0.98 2.50
C-13 m2 1 2.55 0.9 2.30
C-14 m2 3 2.55 0.8 6.12
C-14 (CC7) m2 3 2.55 0.8 6.12

2°PISO Forma cilindrica 124.62


C-1 m2 1 2.55 0.42 3.36
C-2 m2 2 2.55 0.3 4.80

C-3 m2 3 2.55 1.20 9.18


C-5 m2 1 2.55 1.32 3.37
C-6 m2 1 2.55 1.05 2.68
C-7 m2 1 2.55 1.50 3.83
C-9 m2 2 2.55 1.14 5.81
C-10 m2 6 2.55 0.9 13.77
C-11 m2 8 2.55 0.9 18.36
C-13 m2 1 2.55 0.9 2.30

3°PISO Forma cilindrica 105.59


C-2 m2 2 2.55 0.3 4.80

C-1 m2 1 2.55 1.2 3.06


C-3 m2 3 2.55 1.2 9.18
C-5 m2 1 2.55 1.32 3.37
C-6 m2 1 2.55 1.05 2.68
C-7 m2 1 2.55 1.50 3.83
C-9 m2 2 2.55 1.14 5.81
C-10 m2 6 2.55 0.9 13.77
C-11 m2 8 2.55 0.9 18.36
C-13 m2 1 2.55 0.9 2.30

AZOTEA Forma cilindrica 70.99


C-2 m2 2 2.55 0.3 4.80

C-3 m2 3 2.55 1.2 9.18


C-5 m2 1 2.55 1.32 3.37
C-10 m2 6 2.55 0.9 13.77
C-11 m2 8 2.55 0.9 18.36
C-13 m2 1 2.55 0.9 2.30
O.E 2.3.3.3 ACERO

O.E 2.3.4 VIGAS


O.E 2.3.2.1 CONCRETO EN VIGAS f'C=210 kg/cm2 m3 14.92
V-3( 0.15X0.30) EJE A, 3-8 1,2 Y 3 PISOS 3 6.48 0.15 0.30 0.87
V-3( 0.15X0.30) EJE A, 7-8 AZOTEA 1 2.05 0.15 0.30 0.09
V-1( 0.30X0.20) EJE B, 1-4 1,2,3 Y AZOTEA 4 4.55 0.30 0.20 1.09
V-1( 0.30X0.20) EJE C, 4-6 1,2 Y 3 PISOS 3 2.64 0.30 0.20 0.48
VCH-1( 0.42X0.20) EJE C, 6-8 1,2 Y 3 PISOS 3 3.74 0.42 0.20 0.94
V-1( 0.30X0.20) EJE C, 8-9 1,2 Y 3 PISOS 3 2.79 0.30 0.20 0.50
V-1( 0.30X0.20) EJE C, 7-9 AZOTEA 1 4.35 0.30 0.20 0.26
V-3( 0.15X0.30) EJE D, 1-5 1,2 Y 3 PISOS 3 5.70 0.15 0.30 0.77
V-3( 0.15X0.30) EJE D, 1-4 AZOTEA 1 4.70 0.15 0.30 0.21
V-2( 0.15X0.20) EJE E, 6-9 1,2 Y 3 PISOS 3 5.68 0.15 0.20 0.51
V-2( 0.15X0.20) EJE E, 7-9 AZOTEA 1 3.29 0.15 0.20 0.10
V-3( 0.15X0.30) EJE F, 1-7 1,2 Y 3 PISOS 3 8.03 0.15 0.30 1.08
V-2( 0.15X0.20) EJE F, 8-9 1,2,3 Y AZOTEA 4 2.15 0.15 0.20 0.26
V-1( 0.30X0.20) EJE 1 Y 3, A-B 1,2 Y 3 PISOS 6 2.45 0.30 0.20 0.88
V-3( 0.15X0.30) EJE 1, B-D 1,2,3 Y AZOTEA 4 2.03 0.15 0.30 0.36
V-1( 0.30X0.20) EJE 1 Y 2, D-F 1,2,3 Y AZOTEA 7 2.80 0.30 0.20 1.18
V-1( 0.30X0.20) EJE 4, A-C 1,2 Y 3 PISOS 3 3.50 0.30 0.20 0.63
VA-1( 0.15X0.20) EJE 4, C-F 1,2 Y 3 PISOS 3 3.60 0.15 0.20 0.32
V-3( 0.15X0.30) EJE 4, B-D AZOTEA 1 1.73 0.15 0.30 0.08
VA-1( 0.15X0.20) EJE 5, D-F 1,2 Y 3 PISOS 3 2.45 0.15 0.20 0.22
VCH-1( 0.42X0.20) EJE 6, A-F 1,2 Y 3 PISOS 3 7.70 0.42 0.20 1.94
VA-1( 0.15X0.20) EJE 7, D-F 1,2 Y 3 PISOS 3 2.55 0.15 0.20 0.23
VA-1( 0.15X0.20) EJE 7, A-E AZOTEA 1 4.90 0.15 0.20 0.15
VA-1( 0.15X0.20) EJE 8, A-C 1,2,3 Y AZOTEA 4 3.35 0.15 0.20 0.40
VA-2( 0.30X0.20) EJE 8, C-F 1,2,3 Y AZOTEA 4 3.75 0.30 0.20 0.90
VA-1( 0.15X0.20) EJE 9, A-C 1,2,3 Y AZOTEA 4 3.75 0.15 0.20 0.45

O.E 2.3.2.2 ENCONFRADO Y DESECONFRADO NORMAL EN VIGAS m2 83.13


V-3( 0.15X0.30) EJE A, 3-8 1,2 Y 3 PISOS 3 6.48 0.35 6.80
V-3( 0.15X0.30) EJE A, 7-8 AZOTEA 1 2.05 0.35 0.72
V-1( 0.30X0.20) EJE B, 1-4 1,2,3 Y AZOTEA 4 4.55 0.30 5.46
V-1( 0.30X0.20) EJE C, 4-6 1,2 Y 3 PISOS 3 2.64 0.35 2.77
VCH-1( 0.42X0.20) EJE C, 6-8 1,2 Y 3 PISOS 3 3.74 0.42 4.71
V-1( 0.30X0.20) EJE C, 8-9 1,2 Y 3 PISOS 3 2.79 0.30 2.51
V-1( 0.30X0.20) EJE C, 7-9 AZOTEA 1 4.35 0.30 1.31
V-3( 0.15X0.30) EJE D, 1-5 1,2 Y 3 PISOS 3 5.70 0.35 5.99
V-3( 0.15X0.30) EJE D, 1-4 AZOTEA 1 4.70 0.35 1.65
V-2( 0.15X0.20) EJE E, 6-9 1,2 Y 3 PISOS 3 5.68 0.15 2.56
V-2( 0.15X0.20) EJE E, 7-9 AZOTEA 1 3.29 0.15 0.49
V-3( 0.15X0.30) EJE F, 1-7 1,2 Y 3 PISOS 3 8.03 0.35 8.43
V-2( 0.15X0.20) EJE F, 8-9 1,2,3 Y AZOTEA 4 2.15 0.15 1.29
V-1( 0.30X0.20) EJE 1 Y 3, A-B 1,2 Y 3 PISOS 6 2.45 0.30 4.41
V-3( 0.15X0.30) EJE 1, B-D 1,2,3 Y AZOTEA 4 2.03 0.35 2.84
V-1( 0.30X0.20) EJE 1 Y 2, D-F 1,2,3 Y AZOTEA 7 2.80 0.30 5.88
V-1( 0.30X0.20) EJE 4, A-C 1,2 Y 3 PISOS 3 3.50 0.30 3.15
VA-1( 0.15X0.20) EJE 4, C-F 1,2 Y 3 PISOS 3 3.60 0.15 1.62
V-3( 0.15X0.30) EJE 4, B-D AZOTEA 1 1.73 0.35 0.61
VA-1( 0.15X0.20) EJE 5, D-F 1,2 Y 3 PISOS 3 2.45 0.15 1.10
VCH-1( 0.42X0.20) EJE 6, A-F 1,2 Y 3 PISOS 3 7.70 0.42 9.70
VA-1( 0.15X0.20) EJE 7, D-F 1,2 Y 3 PISOS 3 2.55 0.15 1.15
VA-1( 0.15X0.20) EJE 7, A-E AZOTEA 1 4.90 0.15 0.74
VA-1( 0.15X0.20) EJE 8, A-C 1,2,3 Y AZOTEA 4 3.35 0.15 2.01
VA-2( 0.30X0.20) EJE 8, C-F 1,2,3 Y AZOTEA 4 3.75 0.20 3.00
VA-1( 0.15X0.20) EJE 9, A-C 1,2,3 Y AZOTEA 4 3.75 0.15 2.25

O.E 2.3.2.3 ACERO f'=4,200 kg/cm2 kg

O.E 2.3.3 LOSAS ALIGERADAS


O.E 2.3.3.1 Losa aligerada de f'c=200 Kg/cm² m³ 5.73
Primer piso para (Para 1 m² = 0.0875 m³) concreto/1m²
Eje 1 y 2 entre D y F 1 1.480 1.400 0.088 0.181
Eje 2 y 4 entre D y F 1 0.800 1.400 0.088 0.098
Eje 5 y 6 entre D y F 1 0.500 1.030 0.088 0.045
Eje 5 y 4 entre D y F 1 0.500 1.030 0.088 0.045
Eje 5 y 6 entre D y F 1 0.820 1.950 0.088 0.140
Eje 6 y 7 entre D y F 1 1 0.690 1.100 0.088 0.066
Eje 6 y 7 entre D y F 2 1 0.690 0.750 0.088 0.045
Eje 7 y 8 entre D y F 1 1.100 0.750 0.088 0.170
Eje 8 y 9 entre C y E 1 1 1.150 0.780 0.088 0.176
Eje 8 y 9 entre C y E 2 1 1.150 1.100 0.088 0.111
Eje 8 y 6 entre A y B 1 1.420 0.570 0.088 0.071
Eje 6 y 4 entre A y B 1 1.320 1.750 0.088 0.202
Eje 3 y 4 entre A y B 1 0.350 1.210 0.088 0.037
Eje 1 entre B y D 1 0.100 0.590 0.088 0.235
Eje 1 entre F y D 1 0.210 1.400 0.088 0.454

Losa aligerada de f'c=200 Kg/cm²


Segundo-tercero-cuarto piso (Para 1 m² = 0.0875 m³) concreto/1m²
Eje 1 y 2 entre D y F 2 1.480 1.400 0.088 0.363
Eje 2 y 4 entre D y F 2 0.800 1.400 0.088 0.196
Eje 5 y 6 entre D y F 2 0.500 1.030 0.088 0.090
Eje 5 y 4 entre D y F 2 0.500 1.030 0.088 0.090
Eje 5 y 6 entre D y F 2 0.820 1.950 0.088 0.280
Eje 6 y 7 entre D y F 1 2 0.690 1.100 0.088 0.133
Eje 6 y 7 entre D y F 2 2 0.690 0.750 0.088 0.091
Eje 7 y 8 entre D y F 2 1.100 0.750 0.088 0.144
Eje 8 y 9 entre C y E 1 3 1.150 0.780 0.088 0.235
Eje 8 y 9 entre C y E 2 3 1.150 1.100 0.088 0.332
Eje 6 y 8 entre A y B 2 1.940 1.720 0.088 0.584
Eje 6 y 4 entre A y B 2 1.320 1.750 0.088 0.404
Eje 3 y 4 entre A y B 2 0.350 1.210 0.088 0.074
Eje 1 entre B y D 3 0.100 0.590 0.088 0.015
Eje 1 entre F y D 3 0.210 1.400 0.088 0.077
Eje 7 y 6 entre A y D 1 1.170 1.750 0.088 0.179
Eje 7 y 6 entre A y D 1 1.100 0.780 0.088 0.075
Eje 1 y 4 entre B y D 1 2.500 1.010 0.088 0.221

O.E 2.3.3.2 Encofrado y desencofrado de losa aligerada m² 53.22


Eje 1 y 2 entre D y F 1 1.480 1.400 2.072
Eje 2 y 4 entre D y F 1 0.800 1.400 1.12
Eje 5 y 6 entre D y F 1 0.500 1.030 0.515
Eje 5 y 4 entre D y F 1 0.500 1.030 0.515
Eje 5 y 6 entre D y F 1 0.820 1.950 1.599
Eje 6 y 7 entre D y F 1 1 0.690 1.100 0.759
Eje 6 y 7 entre D y F 2 1 0.690 0.750 0.5175
Eje 7 y 8 entre D y F 1 1.100 0.750 0.825
Eje 8 y 9 entre C y E 1 1 1.150 0.780 0.897
Eje 8 y 9 entre C y E 2 1 1.150 1.100 1.265
Eje 8 y 6 entre A y B 1 1.420 0.570 0.8094
Eje 6 y 4 entre A y B 1 1.320 1.750 2.31
Eje 3 y 4 entre A y B 1 0.350 1.210 0.4235
Eje 1 entre B y D 1 0.100 0.590 0.059
Eje 1 entre F y D 1 0.210 1.400 0.294
Eje 1 y 2 entre D y F 2 1.480 1.400 4.144
Eje 2 y 4 entre D y F 2 0.800 1.400 2.24
Eje 5 y 6 entre D y F 2 0.500 1.030 1.03
Eje 5 y 4 entre D y F 2 0.500 1.030 1.03
Eje 5 y 6 entre D y F 2 0.820 1.950 3.198
Eje 6 y 7 entre D y F 1 2 0.690 1.100 1.518
Eje 6 y 7 entre D y F 2 2 0.690 0.750 1.035
Eje 7 y 8 entre D y F 2 1.100 0.750 1.65
Eje 8 y 9 entre C y E 1 3 1.150 0.780 2.691
Eje 8 y 9 entre C y E 2 3 1.150 1.100 3.795
Eje 6 y 8 entre A y B 2 1.940 1.720 6.6736
Eje 6 y 4 entre A y B 2 1.320 1.750 4.62
Eje 3 y 4 entre A y B 2 0.350 1.210 0.847
Eje 1 entre B y D 3 0.100 0.590 0.177
Eje 1 entre F y D 3 0.210 1.400 0.882
Eje 7 y 6 entre A y D 1 1.170 1.750 2.0475
Eje 7 y 6 entre A y D 1 1.100 0.780 0.858
Eje 1 y 4 entre B y D 1 2.500 1.010 2.525

O.E 2.3.3.3 LADRILLO PARA TECHO PISO 1 - 2 -3 - 4 m² 529.36


Eje 1 y 2 entre D y F 1 1.480 1.400 9 18.648
Eje 2 y 4 entre D y F 1 0.800 1.400 9 10.08
Eje 5 y 6 entre D y F 1 0.500 1.030 9 4.635
Eje 5 y 4 entre D y F 1 0.500 1.030 9 4.635
Eje 5 y 6 entre D y F 1 0.820 1.950 9 14.391
Eje 6 y 7 entre D y F 1 1 0.690 1.100 9 6.831
Eje 6 y 7 entre D y F 2 1 0.690 0.750 9 4.6575
Eje 7 y 8 entre D y F 1 1.100 0.750 9 7.425
Eje 8 y 9 entre C y E 1 1 1.150 0.780 9 8.073
Eje 8 y 9 entre C y E 2 1 1.150 1.100 9 11.385
Eje 8 y 6 entre A y B 1 1.420 0.570 9 7.2846
Eje 6 y 4 entre A y B 1 1.320 1.750 9 20.79
Eje 3 y 4 entre A y B 1 0.350 1.210 9 3.8115
Eje 1 entre B y D 1 0.100 0.590 9 0.531
Eje 1 entre F y D 1 0.210 1.400 9 2.646
Eje 1 y 2 entre D y F 2 1.480 1.400 9 37.296
Eje 2 y 4 entre D y F 2 0.800 1.400 9 20.16
Eje 5 y 6 entre D y F 2 0.500 1.030 9 9.27
Eje 5 y 4 entre D y F 2 0.500 1.030 9 9.27
Eje 5 y 6 entre D y F 2 0.820 1.950 9 28.782
Eje 6 y 7 entre D y F 1 2 0.690 1.100 9 13.662
Eje 6 y 7 entre D y F 2 2 0.690 0.750 9 9.315
Eje 7 y 8 entre D y F 2 1.100 0.750 9 14.85
Eje 8 y 9 entre C y E 1 3 1.150 0.780 9 24.219
Eje 8 y 9 entre C y E 2 3 1.150 1.100 9 34.155
Eje 6 y 8 entre A y B 2 1.940 1.720 9 60.062
Eje 6 y 4 entre A y B 2 1.320 1.750 9 41.58
Eje 3 y 4 entre A y B 2 0.350 1.210 9 7.623
Eje 1 entre B y D 3 0.100 0.590 9 1.593
Eje 1 entre F y D 3 0.210 1.400 9 7.938
Eje 7 y 6 entre A y D 1 1.170 1.750 9 18.428
Eje 7 y 6 entre A y D 1 1.100 0.780 9 7.722
Eje 1 y 4 entre B y D 1 2.500 1.010 9 22.725
O.E 2.3.3.4 ACERO DE LOSA kg
O.E 2.3.4 ESCALERA
O.E 2.3.4.1 PARA EL CONCRETO f'c=210kg/cm2 m3 6.35
Piso 1
Escalera 1
Zapata para escalera 1 0.5 1.1 1.75 0.96
Tramo 1 1 0.996 1.1 1.10
Escalera 2
Zapata para escalera 1 0.5 0.95 1.22 0.58
Tramo 1 1 0.32 0.95 0.31
Tramo 2 1 0.78 0.9 0.70
Tramo 3 1 0.38 0.95 0.36

Piso 2 y 3
Escalera 1
Tramo 1 2 1.064 1.1 2.34

O.E 2.3.4.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 39.28


Piso 1
Escalera 1
Zapata para escalera 1 2.70 1.75 4.73
Fondo de escalera 1 3.24 1.1 3.56
Fondo de descanso 1 0.55 1.1 0.61
Costado 1 3.24 0.3 0.97
Contrapasos 12 1.1 0.18 2.31
Escalera 2
Zapata para escalera 1 2.40 0.47 1.13
Fondo de escalera Tramo 1 1 0.67 0.95 0.64
Fondo de escalera Tramo 2 1 2.31 0.90 2.08
Fondo de escalera Tramo 3 1 0.51 0.95 0.48
Fondo de descanso Tramo 1 1 0.60 0.95 0.57
Fondo de descanso Tramo 2 1 1.10 0.90 0.99
Fondo de descanso Tramo 3 1 1.10 0.95 1.05
Costado de los tramos 1, 2 y 3 1 3.49 0.30 1.05
Contrapasos Tramo 1 3 0.95 0.18 0.51
Contrapasos Tramo 2 8 0.90 0.18 1.28
Contrapasos Tramo 3 2 0.95 0.18 0.34

Piso 2 y 3
Escalera 1
Fondo de escalera 2 3.85 1.1 8.47
Fondo de descanso 2 0.55 1.1 1.21
Costado 2 3.85 0.3 2.31
Contrapasos 26 1.1 0.18 5.01
O.E 2.3.4.3 ACERO DE ESCALERA kg
O.E 2.3.5 TANQUE ELEVADO
O.E 2.3.5.1 PARA EL CONCRETO f'c=210kg/cm2 m3 1.69
FONDO 1 1.2 1.2 0.15 0.22
LADOS LATERAL 1 1 1.5 0.15 2.05 0.46
LADOS LATERAL 2 1 1.5 0.15 1.95 0.44
LADO LATERAL 3 1 0.15 1.2 1.6 0.29
LADO LATERAL 4 1 0.15 1.2 1.6 0.29
TAPA 1 0.6 0.6 0.15 0.05
O.E 2.3.5.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 31.72
FONDO 1 1.5 1.5 2.25
LADOS LATERAL 1 4 1.5 0.2 1.2
LADOS LATERAL 2 4 2.55 1.5 15.3
LADO LATERAL 3 4 2.4 1.3 12.48
TAPA 1 0.7 0.7 0.49
PRESUSPUESTO
ESPECIALIDAD: ARQUITECTURA
OBRA: HOJA N°4
CLIENTE: FECHA: 7/10/2021
UBICACIÓN:

N° DE N° DE MEDIDAS PARCIAL
UND DESCRIPCION TOTAL
PARTIDA VECES LONG. ANCHO ALTO
OE.3.1 MUROS Y TABIQUES DE ALBAÑILERIA 1180.134
OE.3.1.1 m2 MUROS DE LADRILLO KING KONG DE ARCILLA,9X13X241:4,J=1.5 cm 590.067
PRIMER PISO
EJE 9-9/A-C 1 3.5 2.55 8.925
EJE 9-9/C-E 1 1.55 2.55 3.9525
EJE 9-9/E-F 1 1.9 2.55 4.845
EJE 8-8/A-C 1 3.35 2.55 8.5425
V1 1 1.95 1.85 3.6075
M1 1 1.825 2.55 4.6538
EJE 8-8/E-F 1 2.05 2.55 5.2275
V6 1 1.5 1.85 2.775
EJE 7-7/C-E 1 0.55 2.55 1.4025
V4 1 1.1 1.35 1.485
P6 1 0.8 2.55 2.04
EJE 7-7E-F 1 1.25 2.55 3.1875
EJE 5-5/E-F 1 1.75 2.55 4.4625
P5 1 0.7 2.55 1.785
EJE 4-4/D-E 1 1.75 2.55 4.4625
P5 1 0.7 2.55 1.785
EJE 4-5/A-B 2 2.2 2.55 11.22
V1 1 1.95 1.85 3.6075
P4 1 0.9 2.1 1.89
EJE 4-5/C-E 1 0.25 2.55 0.6375
P5 1 0.7 2.1 1.47
EJE 1-1/A-B 1 2.425 2.55 6.1838
P2 1 2.425 2.55 6.1838
EJE 1-1/B-D 1 2.025 2.55 5.1638
P1 1 0.925 2.55 2.3588
EJE 1-1/D-F 1 2.8 2.55 7.14
P3 1 2.8 2.55 7.14
EJE A-A/9-8 1 2.2 2.55 5.61
EJE A-A/8-6 1 3.4 2.55 8.67
EJE A-A/6-4 1 2.98 2.55 7.599
EJE A-A/4-3 1 0.4 2.55 1.02
EJE A-A/3-1 1 3.85 2.55 9.8175
EJE E-E/9-8 1 1.5 2.55 3.825
P6 1 0.8 2.1 1.68
EJE E-E/8-7 1 2.04 2.55 5.202
V5 2 1.23 1.2 2.952
P6 1 0.8 2.1 1.68
EJE C-E/6-5 1 1.71 2.55 4.3605
EJE D-D/5-2 1 2.75 2.55 7.0125
EJE D-D/2-1 1 2.95 2.55 7.5225
EJE B-D/4-2 1 2.15 2.55 5.4825
V2 1 0.6 0.25 0.15
EJE F-F/9-8 1 2.15 2.55 5.4825
EJE F-F/8-7 1 2.2 2.55 5.61
EJE F-F/7-6 1 0.9 2.55 2.295
EJE F-F/6-5 1 1.83 2.55 4.6665
EJE F-F/5-4 1 1 2.55 2.55
EJE F-F/4-2 1 1.45 2.55 3.6975
EJE F-F/2-1 1 2.95 2.55 7.5225
220.5413
SEGUNDO PISO
EJE 9-9/C-E 1 1.55 2.55 3.9525
EJE 9-9/E-F 1 1.9 2.55 4.845
EJE 8-8/A-C 1 3.34 2.55 8.517
V10 1 2 2.05 4.1
V2 1 0.6 0.25 0.15
EJE 8-8/C-F 1 3.75 2.55 9.5625
P4 1 0.9 2.1 1.89
V6 1 1.5 1.85 2.775
EJE 7-7/E-F 1 2.05 2.55 5.2275
V6 1 1.5 1.85 2.775
EJE 4-4/D-E 1 1.75 2.55 4.4625
V8 1 0.45 0.45 0.2025
M2 1 1.55 2.55 3.9525
P5 1 0.7 2.55 1.785
EJE 1-1/B-D 1 2.025 2.55 5.1638
EJE 1-1/D-F 1 2.8 2.55 7.14
V9 1 3.34 2.05 6.847
EJE C-C/9-8 1 2.15 2.55 5.4825
V6 1 1.5 1.85 2.775
EJE F-F/9-8 1 2.15 2.55 5.4825
EJE A-A/8-7 1 2.05 2.55 5.2275
EJE A-A/7-6 1 1.05 2.55 2.6775
EJE A-A/6-4 1 2.98 2.55 7.599
EJE A-A/4-3 1 0.4 2.55 1.02
EJE A-A/3-1 1 3.85 2.55 9.8175
EJE A-C/8-7 1 2.45 2.55 6.2475
EJE A-C/8-7 1 2.15 2.55 5.4825
P5 1 0.7 2.55 1.785
EJE D-D/7-5 1 3.36 2.55 8.568
P4 1 0.9 2.1 1.89
EJE D-D/4-1 1 6.24 2.55 15.912
P4 1 0.9 2.1 1.89
EJE F-F/7-6 1 0.9 2.55 2.295
EJE F-F/6-5 1 1.83 2.55 4.6665
EJE F-F/5-4 1 1 2.55 2.55
EJE F-F/4-2 1 1.45 2.55 3.6975
EJE F-F/2-1 1 2.95 2.55 7.5225
EJE D-F/5-1 1 3.5 2.55 8.925
P5 1 0.7 2.1 1.47
186.3308
TERCER PISO
EJE 9-9/C-E 1 1.55 2.55 3.9525
EJE 9-9/E-F 1 1.9 2.55 4.845
EJE 8-8/A-C 1 3.35 2.55 8.5425
V11 1 2 1.543 3.086
V2 1 0.6 0.25 0.15
EJE 8-8/C-E 1 1.55 2.55 3.9525
EJE 8-8/E-F 1 2.05 2.55 5.2275
P6 1 0.8 2.1 1.68
V6 1 1.5 1.85 2.775
EJE 7-7/C-E 1 2.5 2.55 6.375
EJE 7-7/E-F 1 2.35 2.55 5.9925
EJE 8-7/C-E 1 2.65 2.55 6.7575
P5 1 0.7 2.55 1.785
EJE 6-6/E-F 1 1.65 2.55 4.2075
EJE 6-5/E-F 1 0.9 2.55 2.295
V8 1 0.45 0.45 0.2025
EJE 5-5/E-F 1 0.6 2.55 1.53
V8 1 0.45 0.45 0.2025
EJE 5-5/E-F 1 1.05 2.55 2.6775
EJE 4-4/A-B 1 2.42 2.55 6.171
M2 1 1.55 2.55 3.9525
EJE 4-4B-D 1 0.78 2.55 1.989
P6 1 0.8 2.1 1.68
EJE 4-4/B-D 1 1.1 2.55 2.805
V9 1 3.34 2.05 6.847
EJE A-A/8-7 1 2.05 2.55 5.2275
EJE A-A/7-6 1 1.05 2.55 2.6775
EJE A-A/6-4 1 2.98 2.55 7.599
EJE A-A/4-3 1 0.4 2.55 1.02
EJE C-C/9-8 1 2.15 2.55 5.4825
V6 1 1.5 1.85 2.775
EJE E-E/8-7 1 2.5 2.55 6.375
V2 1 0.6 0.25 0.15
EJE A-C/8-5 1 5 2.55 12.75
EJE C-C/5-4 1 0.85 2.55 2.1675
EJE D-D/4-1 1 5.15 2.55 13.133
P6 1 0.8 2.1 1.68
EJE E-F/7-5 1 1.88 2.55 4.794
P5 1 0.7 2.1 1.47
EJE F-F/9-8 1 2.15 2.55 5.4825
EJE F-F/7-6 1 0.9 2.55 2.295
EJE F-F/6-5 1 1.83 2.55 4.6665
EJE F-F/5-4 1 1 2.55 2.55
EJE F-F/4-2 1 1.45 2.55 3.6975
EJE F-F/2-1 1 2.95 2.55 7.5225
183.195

OE.3.1.3 m2 MUROS DE LADRILLO PANDERETA,12x10x23,1:4,J=1.5 cm 590.067


PRIMER PISO
EJE 9-9/A-C 1 3.5 2.55 8.925
EJE 9-9/C-E 1 1.55 2.55 3.9525
EJE 9-9/E-F 1 1.9 2.55 4.845
EJE 8-8/A-C 1 3.35 2.55 8.5425
V1 1 1.95 1.85 3.6075
M1 1 1.825 2.55 4.6538
EJE 8-8/E-F 1 2.05 2.55 5.2275
V6 1 1.5 1.85 2.775
EJE 7-7/C-E 1 0.55 2.55 1.4025
V4 1 1.1 1.35 1.485
P6 1 0.8 2.55 2.04
EJE 7-7E-F 1 1.25 2.55 3.1875
EJE 5-5/E-F 1 1.75 2.55 4.4625
P5 1 0.7 2.55 1.785
EJE 4-4/D-E 1 1.75 2.55 4.4625
P5 1 0.7 2.55 1.785
EJE 4-5/A-B 2 2.2 2.55 11.22
V1 1 1.95 1.85 3.6075
P4 1 0.9 2.1 1.89
EJE 4-5/C-E 1 0.25 2.55 0.6375
P5 1 0.7 2.1 1.47
EJE 1-1/A-B 1 2.425 2.55 6.1838
P2 1 2.425 2.55 6.1838
EJE 1-1/B-D 1 2.025 2.55 5.1638
P1 1 0.925 2.55 2.3588
EJE 1-1/D-F 1 2.8 2.55 7.14
P3 1 2.8 2.55 7.14
EJE A-A/9-8 1 2.2 2.55 5.61
EJE A-A/8-6 1 3.4 2.55 8.67
EJE A-A/6-4 1 2.98 2.55 7.599
EJE A-A/4-3 1 0.4 2.55 1.02
EJE A-A/3-1 1 3.85 2.55 9.8175
EJE E-E/9-8 1 1.5 2.55 3.825
P6 1 0.8 2.1 1.68
EJE E-E/8-7 1 2.04 2.55 5.202
V5 2 1.23 1.2 2.952
P6 1 0.8 2.1 1.68
EJE C-E/6-5 1 1.71 2.55 4.3605
EJE D-D/5-2 1 2.75 2.55 7.0125
EJE D-D/2-1 1 2.95 2.55 7.5225
EJE B-D/4-2 1 2.15 2.55 5.4825
V2 1 0.6 0.25 0.15
EJE F-F/9-8 1 2.15 2.55 5.4825
EJE F-F/8-7 1 2.2 2.55 5.61
EJE F-F/7-6 1 0.9 2.55 2.295
EJE F-F/6-5 1 1.83 2.55 4.6665
EJE F-F/5-4 1 1 2.55 2.55
EJE F-F/4-2 1 1.45 2.55 3.6975
EJE F-F/2-1 1 2.95 2.55 7.5225
220.5413
SEGUNDO PISO
EJE 9-9/C-E 1 1.55 2.55 3.9525
EJE 9-9/E-F 1 1.9 2.55 4.845
EJE 8-8/A-C 1 3.34 2.55 8.517
V10 1 2 2.05 4.1
V2 1 0.6 0.25 0.15
EJE 8-8/C-F 1 3.75 2.55 9.5625
P4 1 0.9 2.1 1.89
V6 1 1.5 1.85 2.775
EJE 7-7/E-F 1 2.05 2.55 5.2275
V6 1 1.5 1.85 2.775
EJE 4-4/D-E 1 1.75 2.55 4.4625
V8 1 0.45 0.45 0.2025
M2 1 1.55 2.55 3.9525
P5 1 0.7 2.55 1.785
EJE 1-1/B-D 1 2.025 2.55 5.1638
EJE 1-1/D-F 1 2.8 2.55 7.14
V9 1 3.34 2.05 6.847
EJE C-C/9-8 1 2.15 2.55 5.4825
V6 1 1.5 1.85 2.775
EJE F-F/9-8 1 2.15 2.55 5.4825
EJE A-A/8-7 1 2.05 2.55 5.2275
EJE A-A/7-6 1 1.05 2.55 2.6775
EJE A-A/6-4 1 2.98 2.55 7.599
EJE A-A/4-3 1 0.4 2.55 1.02
EJE A-A/3-1 1 3.85 2.55 9.8175
EJE A-C/8-7 1 2.45 2.55 6.2475
EJE A-C/8-7 1 2.15 2.55 5.4825
P5 1 0.7 2.55 1.785
EJE D-D/7-5 1 3.36 2.55 8.568
P4 1 0.9 2.1 1.89
EJE D-D/4-1 1 6.24 2.55 15.912
P4 1 0.9 2.1 1.89
EJE F-F/7-6 1 0.9 2.55 2.295
EJE F-F/6-5 1 1.83 2.55 4.6665
EJE F-F/5-4 1 1 2.55 2.55
EJE F-F/4-2 1 1.45 2.55 3.6975
EJE F-F/2-1 1 2.95 2.55 7.5225
EJE D-F/5-1 1 3.5 2.55 8.925
P5 1 0.7 2.1 1.47
186.3308
TERCER PISO
EJE 9-9/C-E 1 1.55 2.55 3.9525
EJE 9-9/E-F 1 1.9 2.55 4.845
EJE 8-8/A-C 1 3.35 2.55 8.5425
V11 1 2 1.543 3.086
V2 1 0.6 0.25 0.15
EJE 8-8/C-E 1 1.55 2.55 3.9525
EJE 8-8/E-F 1 2.05 2.55 5.2275
P6 1 0.8 2.1 1.68
V6 1 1.5 1.85 2.775
EJE 7-7/C-E 1 2.5 2.55 6.375
EJE 7-7/E-F 1 2.35 2.55 5.9925
EJE 8-7/C-E 1 2.65 2.55 6.7575
P5 1 0.7 2.55 1.785
EJE 6-6/E-F 1 1.65 2.55 4.2075
EJE 6-5/E-F 1 0.9 2.55 2.295
V8 1 0.45 0.45 0.2025
EJE 5-5/E-F 1 0.6 2.55 1.53
V8 1 0.45 0.45 0.2025
EJE 5-5/E-F 1 1.05 2.55 2.6775
EJE 4-4/A-B 1 2.42 2.55 6.171
M2 1 1.55 2.55 3.9525
EJE 4-4B-D 1 0.78 2.55 1.989
P6 1 0.8 2.1 1.68
EJE 4-4/B-D 1 1.1 2.55 2.805
V9 1 3.34 2.05 6.847
EJE A-A/8-7 1 2.05 2.55 5.2275
EJE A-A/7-6 1 1.05 2.55 2.6775
EJE A-A/6-4 1 2.98 2.55 7.599
EJE A-A/4-3 1 0.4 2.55 1.02
EJE C-C/9-8 1 2.15 2.55 5.4825
V6 1 1.5 1.85 2.775
EJE E-E/8-7 1 2.5 2.55 6.375
V2 1 0.6 0.25 0.15
EJE A-C/8-5 1 5 2.55 12.75
EJE C-C/5-4 1 0.85 2.55 2.1675
EJE D-D/4-1 1 5.15 2.55 13.133
P6 1 0.8 2.1 1.68
EJE E-F/7-5 1 1.88 2.55 4.794
P5 1 0.7 2.1 1.47
EJE F-F/9-8 1 2.15 2.55 5.4825
EJE F-F/7-6 1 0.9 2.55 2.295
EJE F-F/6-5 1 1.83 2.55 4.6665
EJE F-F/5-4 1 1 2.55 2.55
EJE F-F/4-2 1 1.45 2.55 3.6975
EJE F-F/2-1 1 2.95 2.55 7.5225
183.195

OE.3.1.15 m BARANDAS Y PARAPETOS 33.22


Barandas primer piso (escalera N°1) 1.33 1.33
Barandas segundo piso (escalera N°1) 3.00 3.00
Barandas tercer piso (escalera N°1) 3.00 3.00
Barandas azotea (escalera N°1) 3.00 3.00
Barandas primer piso (escalera N°2) 0.84 0.84
Barandas segundo piso (escalera N°2) 2 3.22 6.44
Barandas segundo piso (balcon N°1) 2.36 2.36
Barandas terce piso (balcon N°1) 2.36 2.36
Barandas azotea (balcon N°1) 1.76 1.76
Barandas segundo piso (balcon N°2) 1.98 1.98
Barandas tercer piso (balcon N°2) 1.98 1.98
Barandas azotea (balcon N°2) 5.17 5.17
OE.3.1.15.1 m2 PARAPETOS 18.41
Parapetos segundo ,tercer y azotea piso (balcon N°1) 3 0.58 0.83 1.44
Parapetos segundo ,tercer y azotea piso (balcon N°2) 3 5.28 0.90 14.26
Parapetos azotea (balcon N°1) 5.42 0.50 2.71

OE.3.2 REVOQUES Y REVESTIMIENTOS


OE.3.2.1 TARRAJEO RAYADO PRIMARIO 436.64
PRIMER PISO
ESTUDIO 1 5.3678 2.55 13.688
PATIO 1 6.3809 2.55 16.271
COCINA 1 7.4439 1.3 9.6771
SALA 1 12.7141 2.55 32.421
BAÑO 1 1 3 2.55 7.65
BAÑO 2 1 3.8 2.55 9.69
ESTACIONAMIENTO 1 10.3564 2.55 26.409
TIENDA 1 13.75 2.55 35.063
150.8685
SEGUNDO PISO
DORMITORIO 1 1 7.2864 2.55 18.58
BAÑO 1 1 4.65 2.55 11.858
STAR TV 1 10.9801 2.55 27.999
DORMITORIO 2 1 8.4724 2.55 21.605
BAÑO 2 1 6.55 2.55 16.703
DORMITORIO PRINCIPAL 1 13.1832 2.55 33.617
130.3614
TERCER PISO
DORMITORIO 1 1 7.2 2.55 18.36
BAÑO 1 4.55 2.55 11.603
KITCHENETTE 1 11.6838 2.55 29.794
SALA COMEDOR 1 10.695 2.55 27.272
DORMITORIO 2 1 14.4588 2.55 36.87
SALA - COMEDOR 1 12.3575 2.55 31.512
155.41

OE3.2.2 TARRAJEO EN INTERIORES 643.81


PRIMER PISO
ESTUDIO
MURO 1 1 1.9 2.55 4.845
MURO 2 1 2.05 2.55 5.228
V6 1 1.5 1.85 2.775
MURO 3 1 1.5 2.55 3.825
P6 1 0.8 2.1 1.68
MURO 4 1 2.15 2.55 5.483
23.835
PATIO
MURO 1 1 2.05 2.55 5.228
V6 1 1.5 1.85 2.775
MURO 2 1 1.75 2.55 4.463
P6 1 0.8 2.1 1.68
MURO 3 1 1.75 2.55 4.463
P6 1 0.8 2.1 1.68
V4 1 1.1 1.35 1.485
MURO 4 1 1.65 2.55 4.208
25.98
SALA - COMEDOR
MURO 1 1 3.35 2.55 8.543
V1 1 1.95 1.85 3.608
M1 1 1.825 2.55 4.654
MURO 2 1 2.2 2.55 5.61
V1 1 1.95 1.85 3.608
P4 1 0.9 2.1 1.89
MURO 3 1 16.269 2.55 41.486
MURO 4 1 3.72 2.55 9.486
78.8832
COCINA
MURO 1 1 1.25 2.55 3.188
P6 1 0.8 2.1 1.68
V4 1 1.1 1.35 1.485
MURO 2 1 1.75 2.55 4.463
P5 1 0.7 2.1 1.47
MURO 3 1 2.51 2.55 6.401
P6 1 0.8 2.1 1.68
MURO 4 1 2.73 2.55 6.962
27.327
BAÑO 1
MURO 1 1 1.75 2.55 4.463
MURO 2 1 1.75 2.55 4.463
V3 1 1 0.45 0.45
MURO 3 1 1.3 2.55 3.315
P5 1 0.7 2.1 1.47
MURO 4 1 1 2.55 2.55
16.71
BAÑO 2
MURO 1 1 0.95 2.55 2.423
MURO 2 1 1.25 2.55 3.188
MURO 3 1 2.15 2.55 5.483
MURO 4 1 1.9 2.55 4.845
15.9375
ESTACIONAMIENTO
MURO 1 1 2.2 2.55 5.61
V1 1 1.95 1.85 3.608
P4 1 0.9 2.1 1.89
MURO 2 1 2.425 2.55 6.184
P2 1 2.425 2.55 6.184
MURO 3 1 4.25 2.55 10.838
MURO 4 1 4.7 2.55 11.985
46.2975
SEGUNDO PISO
DORMITORIO 1
MURO 1 1 3.45 2.55 8.798
MURO 2 1 3.45 2.55 8.798
P1 1 0.925 2.55 2.359
V6 1 1.5 1.85 2.775
MURO 3 1 2.2 2.55 5.61
V6 1 1.5 1.85 2.775
MURO 4 1 2.15 2.55 5.483
36.59625
BAÑO 1
MURO 1 1 1.35 2.55 3.443
V2 1 0.6 0.25 0.15
MURO 2 1 1.65 2.55 4.208
MURO 3 1 2.45 2.55 6.248
MURO 4 1 2.15 2.55 5.483
P5 1 0.7 2.1 1.47
21
ESTAR-TV
MURO 1 1 4.31 2.55 10.991
MURO 2 1 4.45 2.25 10.013
M2 1 1.55 2.55 3.953
P5 1 0.7 2.1 1.47
MURO 3 1 2.98 2.55 7.599
MURO 4 1 2.98 2.55 7.599
P4 1 0.9 2.1 1.89
43.5135
DORMITORIO 2
MURO 1 1 2.05 2.55 5.228
V6 1 1.5 1.85 2.775
MURO 2 1 2.45 2.55 6.248
MURO 3 1 3.27 2.55 8.339
P4 1 0.9 2.1 1.89
MURO 4 1 3.27 2.55 8.339
32.817
DORMITORIO PRINCIPAL
MURO 1 1 2.75 2.55 7.013
V9 1 3.34 2.05 6.847
MURO 3 1 8.21 2.55 20.936
P4 1 0.9 2.1 1.89
P5 1 0.7 2.1 1.47
MURO 4 1 4.4 2.55 11.22
49.375
TERCER PISO
DORMITORIO 1
MURO 1 1 3.75 2.55 9.563
MURO 2 1 3.6 2.55 9.18
P6 1 0.8 2.1 1.68
V6 1 1.5 1.85 2.775
MURO 3 1 2.15 2.55 5.483
V6 1 1.5 1.85 2.775
MURO 4 1 2.15 2.55 5.483
36.9375
KITCHENETTE 1
MURO 1 1 4.95 2.55 12.623
P6 1 0.8 2.1 1.68
V11 1 2 1.543 3.086
V2 1 0.6 0.25 0.15
MURO 2 1 2.5 2.55 6.375
P5 1 0.7 2.1 1.47
MURO 3 1 4.02 2.55 10.251
MURO 4 1 2.5 2.55 6.375
V2 1 0.6 0.25 0.15
42.16
SALA -COMEDOR 1
MURO 2 1 3.45 2.55 8.798
M2 1 1.55 2.1 3.255
P6 1 0.8 2.1 1.68
MURO 3 1 4.02 2.55 10.251
MURO 4 1 5.85 2.55 14.918
38.901
DORMITORIO 2 1
MURO 1 1 4.65 2.55 11.858
V6 1 1.5 1.85 2.775
MURO 2 1 4.7 2.55 11.985
P6 1 0.8 2.1 1.68
MURO 3 1 2 2.55 5.1
MURO 4 1 2.55 2.55 6.5025
39.9
BAÑO 1
MURO 1 1 2.4 2.55 6.12
MURO 02 1 1.05 2.55 2.6775
V8 1 0.45 0.45 0.2025
MURO 03 1 1.9 2.55 4.845
MURO 4 1 1.15 2.55 2.9325
16.7775
BAÑO 2
MURO 1 1 2.41 2.55 6.1455
P5 1 0.7 2.1 1.47
MURO 2 1 2.35 2.55 5.9925
MURO 3 1 1.1 2.55 2.805
MURO 4 1 1.1 2.55 2.805
V2 1 0.6 0.25 0.15
19.368
KITCHENETTE 2
MURO 1 1 1.8 2.55 4.59
V8 1 0.45 2.1 0.945
MURO 2 1 3.05 2.55 7.7775
13.3125
SALA -COMEDOR 2
MURO 3 1 4.35 2.55 11.093
MURO 4 1 2.78 2.55 7.089
18.1815

OE.3.2.3 TARRAJEO MUROS EXTERIORES 82.8765


PRIMER PISO
FACHADA FRONTAL
EJE 2-1/A-B 1 7.15 7.15
P2 1 2.425 2.35 -5.6988
EJE 2-1/B-F 1 13.833 13.833
P3 1 2.8 2.35 -6.58
P1 1 0.925 2.35 -2.1738
FACHA POSTERIOR
EJE 2-1/A-B-D-F 1 21.14 21.14
27.6705
SEGUNDO PISO
FACHADA FRONTAL
EJE 4-5/A-B 1 4.31 4.31
M2 1 1.55 2.1 -3.255
EJE 2-1/D-F 1 9.35 9.35
V9 1 3.34 2.05 -6.847
FACHADA POSTERIOR
EJE 4-1/A-B-D-F 1 20.79 20.79
24.348
TERCER PISO
FACHADA FRONTAL
EJE 4-5/A-B 1 4.31 4.31
M2 1 1.55 2.1 3.255
EJE 2-1/D-F 1 9.35 9.35
V9 1 3.34 2.05 -6.847
FACHADA POSTERIOR
EJE 4-1/A-B-D-F 1 20.79 20.79
30.858

OE.3.2.5 m2 TARRAJEO EN COLUMNAS 151.67


EJE A-A ( PRIMERO , SEGUNDO Y TERCER PISO) 3 2.07 2.55 15.84
EJE B-B ( PRIMERO , SEGUNDO Y TERCER PISO) 3 1.98 2.55 15.15
EJE C-C ( PRIMERO , SEGUNDO Y TERCER PISO) 3 3.87 2.55 29.61
EJE D-D ( PRIMERO , SEGUNDO Y TERCER PISO) 3 4.08 2.55 31.21
EJE E-E ( PRIMERO , SEGUNDO Y TERCER PISO) 3 1.12 2.55 8.57
EJE F-F ( PRIMERO , SEGUNDO Y TERCER PISO) 3 3.12 2.55 23.87
EJE A-A (AZOTEA) 0.80 2.55 2.04
EJE B-B (AZOTEA) 1.69 2.55 4.31
EJE C-C (AZOTEA) 2.85 2.55 7.27
EJE D-D (AZOTEA) 1.20 2.55 3.06
EJE E-E (AZOTEA) 1.92 2.55 4.90
EJE F-F (AZOTEA) 2.30 2.55 5.87

OE.3.2.6 m2 TARRAJEO EN VIGAS 37.93


V-3( 0.15X0.30) EJE A, 3-8 1,2 Y 3 PISOS 3 6.48 0.10 1.94
V-3( 0.15X0.30) EJE A, 7-8 AZOTEA 1 2.05 0.10 0.21
V-1( 0.30X0.20) EJE B, 1-4 1,2,3 Y AZOTEA 4 4.55 0.15 2.73
V-1( 0.30X0.20) EJE C, 4-6 1,2 Y 3 PISOS 3 2.64 0.15 1.19
VCH-1( 0.42X0.20) EJE C, 6-8 1,2 Y 3 PISOS 3 3.74 0.27 3.03
V-1( 0.30X0.20) EJE C, 8-9 1,2 Y 3 PISOS 3 2.79 0.15 1.26
V-1( 0.30X0.20) EJE C, 7-9 AZOTEA 1 4.35 0.15 0.65
V-3( 0.15X0.30) EJE D, 1-5 1,2 Y 3 PISOS 3 5.70 0.10 1.71
V-3( 0.15X0.30) EJE D, 1-4 AZOTEA 1 4.70 0.10 0.47
V-3( 0.15X0.30) EJE F, 1-7 1,2 Y 3 PISOS 3 8.03 0.10 2.41
V-1( 0.30X0.20) EJE 1 Y 3, A-B 1,2 Y 3 PISOS 6 2.45 0.15 2.21
V-3( 0.15X0.30) EJE 1, B-D 1,2,3 Y AZOTEA 4 2.03 0.10 0.81
V-1( 0.30X0.20) EJE 1 Y 2, D-F 1,2,3 Y AZOTEA 7 2.80 0.15 2.94
V-1( 0.30X0.20) EJE 4, A-C 1,2 Y 3 PISOS 3 3.50 0.15 1.58
V-3( 0.15X0.30) EJE 4, B-D AZOTEA 1 1.73 0.10 0.17
VCH-1( 0.42X0.20) EJE 6, A-F 1,2 Y 3 PISOS 3 7.70 0.27 6.24
VA-1( 0.15X0.20) EJE 7, D-F 1,2 Y 3 PISOS 3 2.55 0.15 1.15
VA-1( 0.15X0.20) EJE 7, A-E AZOTEA 1 4.90 0.15 0.74
VA-1( 0.15X0.20) EJE 8, A-C 1,2,3 Y AZOTEA 4 3.35 0.15 2.01
VA-2( 0.30X0.20) EJE 8, C-F 1,2,3 Y AZOTEA 4 3.75 0.15 2.25
VA-1( 0.15X0.20) EJE 9, A-C 1,2,3 Y AZOTEA 4 3.75 0.15 2.25

OE.3.2.11 m VESTIDURAS DE DERRAMES 277.63


P1 (PRIMERO PISO ) 1 5.65 5.65
P2 (PRIMERO PISO) 1 7.13 7.13
P3 (PRIMERO PISO) 1 7.50 7.50
P4 (PRIMERO PISO) 1 5.35 5.35
P5 (PRIMERO PISO) 3 5.15 15.45
P6 (PRIMERO PÍSO) 3 5.25 15.75
M1 (PRIMER PISO) 1 6.35 6.35
P4 (SEGUNDO PISO) 3 4.90 14.70
P5 (SEGUNDO Y TERCER PISO) 5 4.70 23.50
M2 (SEGUNDO Y TERCER PISO) 2 5.55 11.10
P6 (TERCER PISO) 4 4.80 19.20
P5 (AZOTEA) 1 4.30 4.30
P6 (AZOTEA) 2 4.40 8.80
V1 (PRIMERO PISO ) 2 7.60 15.20
V4 (PRIMERO PISO ) 1 3.55 3.55
V5 (PRIMERO PISO ) 1 4.86 4.86
V6 (PRIMERO PISO ) 1 6.70 6.70
V2 (SEGUNDO Y TERCER PISO) 3 1.70 5.10
V6 (SEGUNDO Y TERCER PISO) 6 6.70 40.20
V8 (SEGUNDO Y TERCER PISO) 3 1.80 5.40
V9 (SEGUNDO Y TERCER PISO) 2 10.78 21.56
V10 (SEGUNDO PISO) 1 8.10 8.10
V11 (TERCER PISO) 1 7.08 7.08
V2 (AZOTEA) 1 1.70 1.70
V6 (AZOTEA) 2 6.70 13.40

OE.3.2.19 m BRUÑAS 82.40


SEGUNDO Y TERCER PISO 22 0.65 14.30
10 0.90 9.00
12 2.15 25.80
AZOTEA 11 0.65 7.15
5 1.05 5.25
6 2.15 12.90
TECHO 16 0.50 8.00
OE.3.2 REVOQUES Y REVESTIIMIENTOS
OE.3.3.20 m2 TARRAJEO EN FONDO DE ESCALERA 34.17
m2 ESCALERA 1 4.00 6.48 1.10 28.51
m2 ESCALERA 2 1.00 5.96 0.95 5.66
OE.3.2.21
ml PREPARACION DE GRADAS DE CONCRETO 161.10
ml ESCALERA 1-A 31.00 1.10 34.10
ml ESCALERA 1-B 31.00 1.10 34.10
ml ESCALERA 1-C 31.00 1.10 34.10
ml ESCALERA 1-D 31.00 1.10 34.10
ml ESCALERA 2 26.00 0.95 24.70

OE.3.2.22 m2 PREPARACION DE DESCANSOS 1.71


m2 ESCALERA 2 1.00 1.80 0.95 1.71

OE.3.2.22 ml GRADAS (CERAMICO) 161.10


ml ESCALERA 1-A 31.00 1.10 34.10
ml ESCALERA 1-B 31.00 1.10 34.10
ml ESCALERA 1-C 31.00 1.10 34.10
ml ESCALERA 1-D 31.00 1.10 34.10
ml ESCALERA 2 26.00 0.95 24.70

OE.3.2.24 m2 DESCANSOS (CERAMICO) 1.71


m2 ESCALERA 2 1.00 1.80 0.95 1.71

OE.3.2.25 ENCHAPES (CERAMICO)


GRADAS 161.10
ml ESCALERA 1-A 31.00 1.10 34.10
ml ESCALERA 1-B 31.00 1.10 34.10
ml ESCALERA 1-C 31.00 1.10 34.10
ml ESCALERA 1-D 31.00 1.10 34.10
ml ESCALERA 2 26.00 0.95 24.70
1.71
DESCANSOS
m2 ESCALERA 2 1.00 1.80 0.95 1.71

OE.3.3 CIELORRASOS
OE.3.3.3 m2 CIELORRASO CON MEZCLA 277
1°Piso
Terraza 1 2.45 1.85 4.53
Estudio 1 2.45 2.20 5.39
Comedor y Sala 1 27.04 area 27.04
Cocina 1 11.16 area 11.16
Baño 1 1 1.00 1.05 1.05
Baño 2 1 1.15 0.95 1.09
Ingreso 1 4.70 1.15 5.41
Tienda 1 1 5.00 2.80 14.0
Tienda 2 1 1.00 0.90 0.90
2°Piso
Dormitorio y Cl. 1 2.45 4.05 9.92
Baño 1 2.15 1.35 2.90
Estar TV 1 3.39 4.75 16.10
Estar TV 1 6.22 area 6.22
Dormitorio y Cl. 1 3.45 2.80 9.66
Balcón 1 1.00 2.43 2.43
Hall 1 6.41 area 6.41
Baño 1 4.09 area 4.09
Dormitorio principal y Cl. 1 12.29 area 12.29
Closet 1 1 2.20 0.60 1.32
3°Piso
Dormitorio 1 2.45 4.05 9.92
Kitchenette y Cl. 1 0.95 5.35 5.08
Sala comedor 1 6.00 2.85 17.10
Sala comedor 1 1.00 0.65 0.65
Baño 1 1.10 2.35 2.59
Dormitorio 1 2.55 4.7 11.99
Dormitorio 1 0.90 2.9 2.61
Baño 1 1.88 0.9 1.69
Baño 1 0.75 0.75 0.56
Balcon 1 1.00 2.43 2.43
Hall 1 6.41 area 6.41
Sala comedor y Kitchenette 1 16.04 area 16.04
Azotea
Dormitorio de servicio 1 2.45 4.05 9.92
Lavanderia 1 2.50 2.85 7.13
Lavanderia 1 1.10 2.50 2.75
Baño 1 1.10 2.35 2.59
Azotea 1 3.45 7.7 26.57
Azotea 1 0.93 6.95 6.46
Azotea 1 1.15 2.43 2.79
OE.3.4 PISOS Y PAVIMENTOS
OE.3.4.2 PISOS
OE.3.4.2.17m2 PARQUET 12.44
Dormitorio Principal 1 12.44 area 12.44
OE.3.4.2.21m2 CERÁMICOS 19.94
1°Piso
Patio 1 4.31 area 4.31
Cocina 1 6.47 area 6.47
Baño 1 1.00 1.75 1.75
2°Piso
Baño 1 1 1.25 1.35 1.69
Baño 2 1 2.20 1.05 2.31
3°Piso
Baño 1 1.10 1.55 1.71
Azotea
Baño 1 1.10 1.55 1.71
OE.3.5 ZOCALOS Y CONTRAZÓCALOS
OE.3.5.2 CONTRAZOCALOS
OE.3.5.2.7 m Madera 17.31

Dormitorio Principal 1 17.31 17.31


OE.3.5.2.9 m CERÁMICO 51.40
1°Piso
Patio 1 9.37 9.37
Cocina 1 14.03 14.03
Baño 1 5.70 5.70
2°Piso
Baño 1 1 5.2 5.20
Baño 2 1 6.50 6.50
3°Piso
Baño 1 5.30 5.30
Azotea
Baño 1 5.30 5.30
OE.3.6 COBERTURAS
OE.3.6.5 m2 RECUBRIMIENTOS SOBRE ESTRUCTURAS DE MADERA, METAL, ETC. 2.55
Azotea

viguetas de madera 5 2.73 0.10 1.37

viguetas de madera 1 4.74 0.10 0.47

viguetas de madera 3 4.74 0.05 0.71


OE.3.7 CARPINTERIA DE MADERA
OE.3.7.1 m2 PUERTAS 43.81
Puertas de madera Apanelada
P-1 1.00 0.93 2.35 2.19
P-2 1.00 2.43 2.35 5.71
P-4 4.00 0.90 2.10 7.56
P-5 9.00 0.70 2.10 13.23
P-6 9.00 0.80 2.10 15.12

OE.3.7.2 m2 VENTANAS 57.87


Ventanas de Madera
V-1 1.00 1.95 1.85 3.61
V-2 5.00 0.60 0.25 0.75
V-3 1.00 1.00 0.45 0.45
V-4 1.00 1.10 1.35 1.49
V-5 1.00 1.23 1.20 1.48
V-6 9.00 1.50 1.85 24.98
V-7 1.00 2.35 1.55 3.64
V-8 3.00 0.45 0.45 0.61
V-9 2.00 3.34 2.05 13.69
V-10 1.00 2.00 2.05 4.10
V-11 1.00 2.00 1.54 3.09

OE.3.7.4 m2 MAMPARAS 10.80


Mamparas de madera
M-1 1.00 1.83 2.35 4.29
M-2 2.00 1.55 2.1 6.51

OE.3.7.12 m MUEBLES DE COCINA Y SIMILARES 14.86


1° Piso 9.91
Mueble bajo 2.76
Mueble alto 4.75
Barra de cocina 2.40

2° Piso 4.95
1° Mueble bajo 2.60
2° Mueble bajo 2.35

OE.3.7.14 Und. CLOSET 9.00


1° Piso 4.00
2° Piso 4.00
3° Piso 1.00

OE.3.8 CARPINTERÍA METÁLICA Y HERRERÍA


OE.3.8.8 m2 CORTINAS ENROLLABLES DE FIERRO 6.58
P-3 1.00 2.80 2.35

OE.3.9 CERRAJERÍA
OE.3.9.1 Unid. BISAGRAS 70.00
Bisagra Capuchina Zincada 3"x3" N° Puertas
P-1 4.00 1.00 4.00
P-4 3.00 4.00 12.00
P-5 3.00 9.00 27.00
P-6 3.00 9.00 27.00

OE.3.9.2 Und. CERRADURAS 23.00


Cerradura de sobreponer P-1 1.00
Cerradura de Acero Inoxidable modelo Pomo
P-4 4.00
P-5 9.00
P-6 9.00

OE.3.9.3 Und. SISTEMAS O MECANISMOS 1.00


Sistema levadizo para puerta de cochera 1.00

OE.3.10 m2 VIDRIOS, CRISTALES Y SIMILARES 68.67


Cristal crudo transparaente 6 mm
V-1 1.00 1.95 1.85 3.61
V-2 5.00 0.60 0.25 0.75
V-3 1.00 1.00 0.45 0.45
V-4 1.00 1.10 1.35 1.49
V-5 1.00 1.23 1.20 1.48
V-6 9.00 1.50 1.85 24.98
V-7 1.00 2.35 1.55 3.64
V-8 3.00 0.45 0.45 0.61
V-9 2.00 3.34 2.05 13.69
V-10 1.00 2.00 2.05 4.10
V-11 1.00 2.00 1.54 3.09
M-1 1.00 1.83 2.35 4.29
M-2 2.00 1.55 2.1 6.51

OE.3.10.1 Und. ESPEJOS 6.00


Espejos biselado 0.60 x 0.90 en baños
1° Piso 1.00
2° Piso 2.00
3° Piso 2.00
Azotea 1.00

OE.3.10.3 Und. BLOQUES DE VIDRIO 126.00


Bloques de vidrio 0.20 x 0.20 x 0.8
42.00 1° Piso
42.00 2° Piso
42.00 3° Piso

OE.3.11 m2 PINTURA 466.78


OE.3.11.1 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
Pintura Tekno Color
Cielo Raso 277.18
En interiores
En exteriores
Columnas 151.67
Vigas 37.93

OE.3.12 VARIOS, LIMPIEZA, JARDINERÍA


OE.3.12.1 Glb LIMPIEZA PERMANENTE DE OBRA 1.00

OE.3.12.2 Glb LIMPIEZA FINAL 1.00

OE.3.12.3 m2 LIMPIEZA DE VIDRIOS 79.92


Cristal crudo transparaente 6 mm 68.67
Muro de Blocks de vidrio 3.00 2.00 1.25 1.50 11.25

OE.3.12.4 m2 ENCERADOS DE PISOS 12.44


2° Piso, Dormitorio Principal. Piso Parquet 1.00 Area 12.44

OE.3.12.5 m2 SEMBRÍO DE GRASS 5.10


Jardin 1.00 3.00 1.70
NÚMERO NÚMERO LONGITUD (METROS LINEALES DE VARILLAS)
LONG. POR
ELEMENTO DISEÑO ELEMENTO Ø ELEMENTOS PIEZAS POR
PIEZA (M)
1/4" 3/8" 1/2" 5/8" 3/4" 1"
IGUALES ELEMENTO M M M M M M

0.20 m 14.92 m 0.20


1/2" 1 4 15.82 0.00 0.00 63.28 0.00 0.00 0.00

Eje A, entre los ejes 1 y 9


0.07 m
(0.15x0.30)
0.22 m
0.10 m 1/4" 1 66 0.78 51.48 0.00 0.00 0.00 0.00 0.00

0.20 m 4.92 m 0.20


1/2" 1 2 5.32 0.00 0.00 10.64 0.00 0.00 0.00

Eje B, entre los ejes 1 y 4


(0.15x0.30) 0.07 m

0.10 m 1/4" 1 23 0.78 17.94 0.00 0.00 0.00 0.00 0.00


0.22 m

0.20 m 2.67 m 0.20


1/2" 1 4 3.07 0.00 0.00 12.28 0.00 0.00 0.00

Eje C, entre los ejes 8 y 9


0.07 m
(0.15x0.30)
0.22 m
0.10 m 1/4" 1 12 0.78 9.36 0.00 0.00 0.00 0.00 0.00

0.20 m 6.37 m 0.20


1/2" 1 4 6.77 0.00 0.00 27.08 0.00 0.00 0.00

Eje D, entre los ejes 1 y 5


(0.15x0.30) 0.07 m

0.22 m
0.10 m 1/4" 1 31 0.78 24.18 0.00 0.00 0.00 0.00 0.00

0.20 m 5.35 m 0.20


1/2" 1 4 5.75 0.00 0.00 23.02 0.00 0.00 0.00

Eje E, entre los ejes 7 y 9


0.07 m
(0.15x0.30)
0.22 m
0.10 m 1/4" 1 24 0.78 18.72 0.00 0.00 0.00 0.00 0.00

0.20 m 14.92 m 0.20


1/2" 1 4 15.82 0.00 0.00 63.28 0.00 0.00 0.00

Eje F, entre los ejes 1 y 9


0.07 m
(0.15x0.30)

0.22 m
0.10 m 1/4" 1 69 0.78 53.82 0.00 0.00 0.00 0.00 0.00

0.20 m 7.92 m 0.20


1/2" 1 4 8.32 0.00 0.00 33.28 0.00 0.00 0.00
Eje 1, entre los ejes A y F
(0.15x0.30) 0.07 m
1/4" 1 39 0.78 30.42 0.00 0.00 0.00 0.00 0.00
0.10 m
0.22 m

0.20 m 4.27 m 0.20


1/2" 1 4 4.67 0.00 0.00 18.68 0.00 0.00 0.00

Eje 4, entre los ejes C y F


(0.15x0.30) 0.07 m

0.10 m 1/4" 1 20 0.78 15.60 0.00 0.00 0.00 0.00 0.00


0.22 m

0.20 m 3.16 m 0.20


1/2" 1 4 3.56 0.00 0.00 14.24 0.00 0.00 0.00

Eje 5, entre los ejes D y F


(0.15x0.30) 0.07 m

0.10 m 1/4" 1 13 0.78 10.14 0.00 0.00 0.00 0.00 0.00


0.22 m

0.20 m 3.29 m 0.20


1/2" 1 4 3.69 0.00 0.00 14.76 0.00 0.00 0.00
Eje 7, entre los ejes C y F
(0.15x0.30) 0.07 m
1/4" 1 15 0.78 11.70 0.00 0.00 0.00 0.00 0.00
0.10 m
0.22 m

0.20 m 3.87 m 0.20


1/2" 1 4 4.27 0.00 0.00 17.08 0.00 0.00 0.00

Eje 8, entre los ejes A y C


0.07 m
(0.15x0.30)
0.22 m
0.10 m 1/4" 1 18 0.78 14.04 0.00 0.00 0.00 0.00 0.00

0.20 m 2.42 m 0.20


1/2" 1 4 2.82 0.00 0.00 11.28 0.00 0.00 0.00

Eje 8, entre los ejes E y F


(0.15x0.30) 0.07 m

0.10 m 1/4" 1 18 0.78 14.04 0.00 0.00 0.00 0.00 0.00


0.22 m

0.20 m 7.92 m 0.20


1/2" 1 4 8.32 0.00 0.00 33.28 0.00 0.00 0.00

Eje 9, entre los ejes A y F


0.07 m
(0.15x0.30)

0.22 m
0.10 m 1/4" 1 36 0.78 28.08 0.00 0.00 0.00 0.00 0.00
SUMATORIA (mt) 299.52 0.00 342.18 0.00 0.00 0.00
PESO NOMINAL (kg/mt) 0.250 0.560 0.994 1.552 2.235 3.973
TOTAL (kg) 74.88 0.00 340.12 0.00 0.00 0.00
Acero de refuerzo
1°PISO
Nº DE LONGITUD LONGUITUD DE PIEZA(m)
DESCRIPCION DIAMETRO Nº DE VECES
PIEZAS POR PIEZA 1/4" 1/2" 3/8" 3/4" 5/8"
C-1

3.85
5/8" 1 8 4.2 33.6
0.35

3/8" 1 7 9 63

C-2

3.85
5/8" 2 8 4.2 67.2
0.35

3/8" 2 7 9 126

C-3
4,40

0.25 5/8" 3 8 4.65 111.6

0.15
0.22
3/8" 3 31 1.18 109.74
0.22

C-4
4,50

0.35 1/2" 1 4 4.85 19.4

C-4
4,40

0.35 3/8" 1 6 4.75 28.5

1/4" 1 31 1.83 56.73

C-5
4,60
1/2" 1 8 4.95 39.6
0.35

1/4" 1 62 0.86 53.32


C-6
4,40
3/8" 1 4 4.75 19
0.35

C-6
4,50

0.35 1/2" 1 4 4.85 19.4

1/4" 1 31 1.2 37.2

C-7
4,50

0.35 1/2" 1 8 4.85 38.8

1/4" 1 62 0.78 48.36

C-8
4,70

0.35 3/8" 1 6 5.05

1/4" 1 31 0.98

C-9
4,50

0.35 1/2" 2 8 4.85

1/4" 2 62 1.02

C-10
4,50

0.35 1/2" 6 8 4.85

1/4" 6 62 0.78
C-11
4,50

0.35 1/2" 8 6 4.85

1/4" 8 62 0.48

C-12
4,50

0.35 3/8" 1 6 4.85

1/4" 1 31 0.86

C-13
4,60

0.35 1/2" 1 4 4.95 19.8

C-13
4,50

0.35 3/8" 1 2 4.85 9.7

1/4" 1 62 0.48 29.76

C-14

4,50
3/8" 6 4 4.85 116.4
0.35

1/4" 6 31 0.49 91.14

LONGITUD TOTAL POR VARILLA(m) 268.15 185.36 472.34 0.00 212.40


DENSIDAD LINEAL(kg/m) 0.25 0.99 0.56 2.24 1.55
PESO TOTAL POR VARILLA(kg) 67.04 184.25 264.51 0.00 329.64
METRADO TOTAL DE ACERO (kg) 845.44

Acero de refuerzo
2°PISO
Nº DE LONGITUD LONGUITUD DE PIEZA(m)
DESCRIPCION DIAMETRO Nº DE VECES
PIEZAS POR PIEZA 1/4" 1/2" 3/8" 3/4" 5/8"
C-1

3.35
5/8" 1 8 3.35 26.8
3/8" 1 6 9 54

C-2

3.35
5/8" 2 8 3.35 53.6

3/8" 2 2 9 36

C-3
3,35

5/8" 3 8 3.35 80.4

0.15
0.22
3/8" 3 27 1.18 95.58
0.22

C-5
3,25
1/2" 1 8 3.25 26

1/4" 1 54 0.86 46.44

C-6
3,15
1/2" 1 4 3.25 13

1/4" 1 54 0.93 50.22

C-7
3,25
1/2" 1 8 3.25 26

1/4" 1 54 0.78 42.12


C-9
3,25
1/2" 2 8 3.25

1/4" 2 54 1.02

C-10
3,25
1/2" 6 8 3.25

1/4" 6 54 0.78

C-11
3,25
1/2" 8 6 3.25

1/4" 8 54 0.48

C-13
3,25
1/2" 1 4 3.25 13

C-13
3,15
3/8" 1 2 3.15 6.3

1/4" 1 54 0.48 25.92

LONGITUD TOTAL POR VARILLA(m) 122.58 120.12 191.88 0.00 160.80


DENSIDAD LINEAL(kg/m) 0.25 0.99 0.56 2.24 1.55
PESO TOTAL POR VARILLA(kg) 30.65 119.40 107.45 0.00 249.56
METRADO TOTAL DE ACERO (kg) 507.06

Acero de refuerzo
3°PISO
Nº DE LONGITUD LONGUITUD DE PIEZA(m)
DESCRIPCION DIAMETRO Nº DE VECES
PIEZAS POR PIEZA 1/4" 1/2" 3/8" 3/4" 5/8"
C-1
3,35

5/8" 3 8 3.35 80.4


0.15
0.22
3/8" 3 27 1.18 95.58
0.22

C-2

3.35
5/8" 2 8 3.35 53.6

3/8" 2 2 9 36

C-3
3,35

5/8" 3 8 3.35 80.4

0.15
0.22
3/8" 3 27 1.18 95.58
0.22

C-5
3,25
1/2" 1 8 3.25 26

1/4" 1 54 0.86 46.44

C-6
3,15
1/2" 1 4 3.25 13

1/4" 1 54 0.93 50.22

C-7
3,25
1/2" 1 8 3.25 26

1/4" 1 54 0.78 42.12


C-9
3,25
1/2" 2 8 3.25

1/4" 2 54 1.02

C-10
3,25
1/2" 6 8 3.25

1/4" 6 54 0.78

C-11
3,25
1/2" 8 6 3.25

1/4" 8 54 0.48

C-13
3,25
1/2" 1 4 3.25 13

C-13
3,15
3/8" 1 2 3.15 6.3

1/4" 1 54 0.48 25.92

LONGITUD TOTAL POR VARILLA(m) 122.58 120.12 233.46 0.00 214.40


DENSIDAD LINEAL(kg/m) 0.25 0.99 0.56 2.24 1.55
PESO TOTAL POR VARILLA(kg) 30.65 119.40 130.74 0.00 332.75
METRADO TOTAL DE ACERO (kg) 613.53

Acero de refuerzo
AZOTEA
Nº DE LONGITUD LONGUITUD DE PIEZA(m)
DESCRIPCION DIAMETRO Nº DE VECES
PIEZAS POR PIEZA 1/4" 1/2" 3/8" 3/4" 5/8"
C-2

3.35
5/8" 2 8 3.35 53.6
3/8" 2 2 9 36

C-3
3,35

5/8" 3 8 3.35 80.4

0.15
0.22
3/8" 3 27 1.18 95.58
0.22

C-5
3,25
1/2" 1 8 3.25 26

1/4" 1 54 0.86 46.44

C-10
3,25
1/2" 6 8 3.25

1/4" 6 54 0.78

C-11
3,25
1/2" 8 6 3.25

1/4" 8 54 0.48

C-13
3,25
1/2" 1 4 3.25 13

C-13
3,15
3/8" 1 2 3.15 6.3
1/4" 1 54 0.48 25.92

LONGITUD TOTAL POR VARILLA(m) 72.36 39.00 137.88 0.00 134.00


DENSIDAD LINEAL(kg/m) 0.25 0.99 0.56 2.24 1.55
PESO TOTAL POR VARILLA(kg) 18.09 38.77 77.21 0.00 207.97
METRADO TOTAL DE ACERO (kg) 342.04
PLANILLA DE METRADOS
PROYECTO :
FECHA ϕ MULTIPLICAR POR PARA KG/ML
A CARGO TIPO 1 2 3 4 5 6
UBICACIÓN : 𝜙 1/4" 3/8" 1/2" 5/8" 3/4" 1"
REVISADO : w /m 0.25 0.56 0.994 1.552 2.235 3.973
HOJA : ACERO 01
% DESP. 2% 3% 5% 7% 8% 10%
Nro Nro PARCIAL
ITEM - 𝜙 veces pieza LONG. FIERRO (Kg)
DESCRIPCION TIPO

PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg


V-3( 0.15X0.30) EJE A, 3-8 1,2 Y 3 PISOS
0
6.44
3 1/2" 3 2 6.84 40.79 40.79
0.2 0.2 3 1/2" 3 2 6.84 40.79 40.79

6.44

3 1/2" 3 2 6.44 38.41 38.41


6.44

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.25
ESTRIBOS 1 1/4" 3 54 0.425 17.21 17.21

V-3( 0.15X0.30) EJE A, 7-8 AZOTEA

2.01
3 1/2" 3 2 2.41 14.37 14.37
0.2 0.2 3 1/2" 3 2 2.41 14.37 14.37

2.01

3 1/2" 3 2 2.01 11.99 11.99


2.01

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.25
ESTRIBOS 1 1/4" 3 17 0.425 5.42 5.42

V-1( 0.30X0.20) EJE B, 1-4 1,2,3 Y AZOTEA

4.51
4 5/8" 3 3 4.79 66.91 66.91
0.14 0.14 4 5/8" 3 4 4.79 89.21 89.21

4.51

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 3 40 0.275 8.25 8.25

V-1( 0.30X0.20) EJE C, 4-6 1,2 Y33 PISOS 2.64

2.6
4 5/8" 3 3 2.88 40.23 40.23
0.14 0.14 4 5/8" 3 4 2.88 53.64 53.64

2.6

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 3 20 0.275 4.13 4.13

VCH-1( 0.42X0.20) EJE C, 6-8 1,2 Y 33PISOS 3.74

3.7
4 5/8" 3 4 3.98 74.12 74.12
0.14 0.14 4 5/8" 3 6 3.98 111.19 111.19

3.7

0.1 0.01 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 3 26 0.21 4.10 4.10

V-1( 0.30X0.20) EJE C, 8-9 1,2 Y 3 PISOS 3 2.79


2.75
4 5/8" 3 3 3.03 42.32 42.32
0.14 0.14 4 5/8" 3 4 3.03 56.43 56.43

2.75

0.1 0.01 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 3 22 0.21 3.47 3.47

V-1( 0.30X0.20) EJE C, 7-9 AZOTEA 1 4.35

4.31
4 5/8" 1 3 4.59 21.37 21.37
0.14 0.14 4 5/8" 1 4 4.59 28.49 28.49

4.31

0.1 0.01 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 1 28 0.21 1.47 1.47

V-3( 0.15X0.30) EJE D, 1-5 1,2 Y 3 PISOS 3 5.7

5.66
3 1/2" 3 2 6.06 36.14 36.14
0.2 0.2 3 1/2" 3 2 6.06 36.14 36.14

5.66

3 1/2" 3 2 5.66 33.76 33.76


5.66

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.25
ESTRIBOS 1 1/4" 3 56 0.425 17.85 17.85

V-3( 0.15X0.30) EJE D, 1-4 AZOTEA 1 4.7

4.66
3 1/2" 1 2 5.06 10.06 10.06
0.2 0.2 3 1/2" 1 2 5.06 10.06 10.06

4.66

3 1/2" 1 2 4.66 9.26 9.26


4.66

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.25
ESTRIBOS 1 1/4" 1 46 0.425 4.89 4.89

V-2( 0.15X0.20) EJE E, 6-9 1,2 Y 3 PISOS 3 5.68

5.64
3 1/2" 3 2 5.92 35.31 35.31
0.14 0.14 3 1/2" 3 2 5.92 35.31 35.31

5.64

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.25
ESTRIBOS 1 1/4" 3 52 0.425 16.58 16.58

V-2( 0.15X0.20) EJE E, 7-9 AZOTEA 1 3.29

3.25
3 1/2" 1 2 3.53 7.02 7.02
0.14 0.14 3 1/2" 1 2 3.53 7.02 7.02

3.25

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 1 36 0.275 2.48 2.48

V-3( 0.15X0.30) EJE F, 1-7 1,2 Y 3 PISOS 3 8.03

7.99
3 1/2" 3 2 8.39 50.04 50.04
0.2 0.2 3 1/2" 3 2 8.39 50.04 50.04

7.99

3 1/2" 3 2 7.99 47.65 47.65


7.99

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.25
ESTRIBOS 1 1/4" 3 78 0.425 24.86 24.86

V-2( 0.15X0.20) EJE F, 8-9 1,2,3 Y AZOTEA 4 2.15

2.11
3 1/2" 4 2 2.39 19.01 19.01
0.14 0.14 3 1/2" 4 2 2.39 19.01 19.01

2.11

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 4 20 0.275 5.50 5.50

V-1( 0.30X0.20) EJE 1 Y 3, A-B 1,2 Y 3 PISOS 6 2.45

2.41
4 5/8" 6 3 2.69 75.15 75.15
0.14 0.14 4 5/8" 6 4 2.69 100.20 100.20

2.41

0.1 0.01 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 6 18 0.21 5.67 5.67

V-3( 0.15X0.30) EJE 1, B-D 1,2,3 Y AZOTEA 4 2.025

1.985
3 1/2" 4 2 2.385 18.97 18.97
0.2 0.2 3 1/2" 4 2 2.385 18.97 18.97

1.985

3 1/2" 4 2 1.985 15.78 15.78


1.985

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.25
ESTRIBOS 1 1/4" 4 18 0.425 7.65 7.65

V-1( 0.30X0.20) EJE 1 Y 2, D-F 1,2,3 Y AZOTEA 7 2.8

2.76
4 5/8" 7 3 3.04 99.08 99.08
0.14 0.14 4 5/8" 7 4 3.04 132.11 132.11

2.76

0.1 0.01 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 7 20 0.21 7.35 7.35

V-1( 0.30X0.20) EJE 4, A-C 1,2 Y 3 PISOS 3 3.5

3.46
4 5/8" 3 3 3.74 52.24 52.24
0.14 0.14 4 5/8" 3 4 3.74 69.65 69.65

3.46
0.1 0.01 13 cm ø 1/2"
10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 3 28 0.21 4.41 4.41

VA-1( 0.15X0.20) EJE 4, C-F 1,2 Y 3 PISOS 3 3.6

3.56
3 1/2" 3 2 3.84 22.90 22.90
0.14 0.14 3 1/2" 3 2 3.84 22.90 22.90

3.56

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 3 19 0.275 3.92 3.92

V-3( 0.15X0.30) EJE 4, B-D AZOTEA 1 1.73

1.69
3 1/2" 1 2 2.09 4.15 4.15
0.2 0.2 3 1/2" 1 2 2.09 4.15 4.15

1.69

3 1/2" 1 2 1.69 3.36 3.36


1.69

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.25
ESTRIBOS 1 1/4" 1 18 0.425 1.91 1.91

VA-1( 0.15X0.20) EJE 5, D-F 1,2 Y 3 PISOS 3 2.45

2.41
3 1/2" 3 2 2.69 16.04 16.04
0.14 0.14 3 1/2" 3 2 2.69 16.04 16.04

2.41

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 3 12 0.275 2.48 2.48

VCH-1( 0.42X0.20) EJE 6, A-F 1,2 Y 3 PISOS 3 7.7

3.7
4 5/8" 3 4 3.98 74.12 74.12
0.14 0.14 4 5/8" 3 6 3.98 111.19 111.19

3.7

0.1 0.01 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 2 3/8" 3 76 0.21 11.97 11.97

VA-1( 0.15X0.20) EJE 7, D-F 1,2 Y 3 PISOS 3 2.55

2.51
3 1/2" 3 2 2.79 16.64 16.64
0.14 0.14 3 1/2" 3 2 2.79 16.64 16.64

2.51

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 3 13 0.275 2.68 2.68

VA-1( 0.15X0.20) EJE 7, A-E AZOTEA 1 4.9

4.86
3 1/2" 1 2 5.14 10.22 10.22
0.14 0.14 3 1/2" 1 2 5.14 10.22 10.22

4.86
0.1 0.075 13 cm ø 1/2"
10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 1 24 0.275 1.65 1.65

VA-1( 0.15X0.20) EJE 8, A-C 1,2,3 Y AZOTEA 4 3.35

3.31
3 1/2" 4 2 3.59 28.55 28.55
0.14 0.14 3 1/2" 4 2 3.59 28.55 28.55

3.31

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 4 16 0.275 4.40 4.40

VA-2( 0.30X0.20) EJE 8, C-F 1,2,3 Y AZOTEA 4 3.75

3.71
3 1/2" 4 3 3.99 47.59 47.59
0.14 0.14 3 1/2" 4 4 3.99 63.46 63.46

3.71

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 4 18 0.275 4.95 4.95

VA-1( 0.15X0.20) EJE 9, A-C 1,2,3 Y AZOTEA 4 3.75

3.71
3 1/2" 4 2 3.99 31.73 31.73
0.14 0.14 3 1/2" 4 2 3.99 31.73 31.73

3.71

0.1 0.075 13 cm ø 1/2"


10 cm ø 3/8"
7.5 cm ø 1/4"
0.1
ESTRIBOS 1 1/4" 4 16 0.275 4.40 4.40

RESUMEN DE METRADO POR ø DE ACERO 1/4" 3/8" 1/2" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 128.82 50.81 995.13 1297.64 0.00 0.00 2472.40
TOTAL (KG/ACERO) + DESPERDICIO 331.89 77.43 49514.50 117871.36 0.00 0.00
ACERO EN VARILLAS (VAR) ø 1/4"(kg) 147.50 15.36 5534.82 8438.67 0.00 0.00
Longitud Longitud en metros lineales de varillas
Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje D -F / 1 - 4

0.80
3/8" 3 7 0.98 20.58
0.18

0.80
3/8" 3 7 0.98 20.58
0.18

1.50
1/2" 3 7 1.50 31.50

5.30

1/4" 3 9 5.30 143.10

Longitudes totales por varilla (m) 143.10 41.16 31.50 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560 0.994 1.552 2.235 3.973
Pesos totales por varilla (kg) 35.78 23.05 31.31 0.00 0.00 0.00
Metrado Total de Acero (kg) 90.14

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje A - F / 4-5

0.80
3/8" 3 1 0.98 2.94
0.18

0.80
3/8" 3 1 0.98 2.94
0.18

7.15
1/2" 3 1 7.15 21.45

5.30
1/4" 3 9 5.30 143.10

Longitudes totales por varilla (m) 143.10 5.88 21.45 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560 0.994 1.552 2.235 3.973
Pesos totales por varilla (kg) 143.35 3.29 21.32 0.00 0.00 0.00
Metrado Total de Acero (kg) 167.96

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje D-F / 1-4

0.80
3/8" 3 6 0.98 17.64
0.18

0.80
3/8" 3 6 0.98 17.64
0.18

3.01
1/2" 3 6 3.01 54.18

3.21
1/4" 3 11 3.21 105.93
2.21

1/4'' 3 2 2.21 13.26

Longitudes totales por varilla (m) 119.19 35.28 54.18 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560 0.994 1.552 2.235 3.973
Pesos totales por varilla (kg) 29.80 19.76 53.85 0.00 0.00 0.00
Metrado Total de Acero (kg) 103.41

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje A-F / 4-6

0.80
3/8" 3 4 0.98 11.76
0.18

0.80
3/8" 3 4 0.98 11.76
0.18

7.90
1/2" 3 4 7.15 85.80

2.17
3/8" 3 4 0.98 11.76

3.37
3/8" 3 4 7.15 85.80

3.36
1/4'' 3 3 3.36 30.24

Longitudes totales por varilla (m) 30.24 121.08 85.80 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560 0.994 1.552 2.235 3.973
Pesos totales por varilla (kg) 7.56 67.80 85.29 0.00 0.00 0.00
Metrado Total de Acero (kg) 160.65

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"

Eje A-B/4-5

0.80
3/8" 3 4 0.98 11.76
0.18

0.80
3/8" 3 4 0.98 11.76
0.18

2.78
1/2" 3 4 2.78 33.36

4.36
1/4'' 3 8 4.36 104.64

Longitudes totales por varilla (m) 104.64 23.52 33.36 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560 0.994 1.552 2.235 3.973
Pesos totales por varilla (kg) 26.16 13.17 33.16 0.00 0.00 0.00
Metrado Total de Acero (kg) 72.49

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje C-F / 6-7

4.33
3/8" 3 2 4.51 27.06
0.18 4.33

4.33
3/8" 3 2 4.33 25.98

1.54
1/4" 3 7 1.54 32.34

Longitudes totales por varilla (m) 32.34 53.04 0.00 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560
Pesos totales por varilla (kg) 8.09 53.60 0.00 0.00 0.00 0.00
Metrado Total de Acero (kg) 61.69

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje B-E /8-6

4.33
3/8" 3 1 4.51 13.53
0.18

4.33
3/8" 3 1 4.33 12.99

5.51
0.18
3/8" 3 1 5.69 17.07

5.51
3/8" 3 1 5.51 16.53

1.54
1/4" 3 7 1.54 32.34

Longitudes totales por varilla (m) 32.34 60.12 0.00 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560
Pesos totales por varilla (kg) 8.09 60.68 0.00 0.00 0.00 0.00
Metrado Total de Acero (kg) 68.77

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje C-E/8-9

3.25
3/8" 1 6 3.43 20.58
0.18

3.25
3/8" 1 6 3.25 19.50

6.49
1/4" 1 5 6.49 32.45

3.14
1/4" 1 3 3.14 9.42

Longitudes totales por varilla (m) 41.87 40.08 0.00 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560
Pesos totales por varilla (kg) 10.47 40.64 0.00 0.00 0.00 0.00
Metrado Total de Acero (kg) 51.11
Longitud Longitud en metros lineales de varillas
Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje C-F / 8-9

4.25
3/8" 3 6 4.43 79.74
0.18

4.25
3/8" 3 6 4.25 76.50

2.75
1/4" 3 7 6.49 136.29

Longitudes totales por varilla (m) 136.29 156.24 0.00 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560
Pesos totales por varilla (kg) 136.54 156.80 0.00 0.00 0.00 0.00
Metrado Total de Acero (kg) 293.34

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje A-B / 6-8

0.80
3/8" 2 10 0.98 19.60
0.18

3.51 0.18
3/8" 2 10 3.69 73.80

5.55
3/8" 2 10 5.55 111.00

4.04
1/4" 2 11 0.04 0.88

Longitudes totales por varilla (m) 0.88 204.40 0.00 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560
Pesos totales por varilla (kg) 1.13 204.96 0.00 0.00 0.00 0.00
Metrado Total de Acero (kg) 206.09

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje C-F / 7-9

4.25
3/8" 1 6 4.61 27.66
0.18 0.18

4.25
3/8" 1 6 4.25 25.50

2.75
1/4" 1 7 2.75 19.25

5.10
1/4" 1 5 5.10 25.50

Longitudes totales por varilla (m) 44.75 53.16 0.00 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560
Pesos totales por varilla (kg) 45.00 53.72 0.00 0.00 0.00 0.00
Metrado Total de Acero (kg) 98.72

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje A-B / 7-8
0.80
3/8" 1 6 0.98 5.88
0.18

3.51 0.18 3/8" 1 6 3.69 22.14

5.55
3/8" 1 6 5.55 33.30

2.65
1/4" 1 11 2.65 29.15

Longitudes totales por varilla (m) 29.15 61.32 0.00 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560
Pesos totales por varilla (kg) 29.40 61.88 0.00 0.00 0.00 0.00
Metrado Total de Acero (kg) 91.28

Longitud Longitud en metros lineales de varillas


Descripcion Diametro N° veces N° piezas
por pieza 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Eje B-D/1-4

2.38
3/8" 1 6 2.74 16.44
0.18 0.18

2.38
3/8" 1 6 2.38 14.28

5.30
1/4" 1 7 2.65 18.55

Longitudes totales por varilla (m) 18.55 30.72 0.00 0.00 0.00 0.00
Densidad lineal (kg/m) 0.25 0.560
Pesos totales por varilla (kg) 18.80 31.28 0.00 0.00 0.00 0.00
Metrado Total de Acero (kg) 50.08
NÚMERO NÚMERO LONGITUD (METROS LINEALES DE VARILLAS)
LONG. POR
ELEMENTO DISEÑO ELEMENTO Ø ELEMENTOS PIEZAS POR
PIEZA (M)
1/4" 3/8" 1/2" 5/8" 3/4" 1"
IGUALES ELEMENTO M M M M M M

5/8" 1 7 2.74 0.00 0.00 0.00 19.21 0.00 0.00


Longitud de acero a lo largo

5/8" 1 7 2.02 0.00 0.00 0.00 14.13 0.00 0.00


Longitud de acero a lo largo

1/2" 1 8 4.61 0.00 0.00 36.85 0.00 0.00 0.00


Longitud de acero a lo largo

Escalera 1 -
Longitud de acero a lo largo 1/2" 1 7 1.80 0.00 0.00 12.59 0.00 0.00 0.00
Primer piso

Longitud de acero a lo largo


1/2" 1 7 1.25 0.00 0.00 8.78 0.00 0.00 0.00

Longitud de acero a lo ancho

1/2" 1 20 1.05 0.00 0.00 21.00 0.00 0.00 0.00

Longitud de acero del descanso

1/2" 1 12 1.05 0.00 0.00 12.60 0.00 0.00 0.00

PRIMER TRAMO

5/8" 1 6 2.74 0.00 0.00 0.00 16.46 0.00 0.00

Longitud de acero a lo largo

5/8" 1 6 2.72 0.00 0.00 0.00 16.31 0.00 0.00


Longitud de acero a lo largo

1/2" 1 7 1.91 0.00 0.00 13.39 0.00 0.00 0.00


Longitud de acero a lo largo

Longitud de acero a lo ancho

1/2" 1 7 0.90 0.00 0.00 6.30 0.00 0.00 0.00

SEGUNDO TRAMO

1/2" 1 6 2.44 0.00 0.00 14.62 0.00 0.00 0.00


Longitud de acero a lo largo
Longitud de acero a lo largo 1/2" 1 6 1.71 0.00 0.00 10.26 0.00 0.00 0.00

1/2" 1 7 3.95 0.00 0.00 27.64 0.00 0.00 0.00


Longitud de acero a lo largo

Escalera 2 - Primer piso 1/2" 1 7 1.41 0.00 0.00 9.87 0.00 0.00 0.00
Longitud de acero a lo largo

1/2" 1 6 1.55 0.00 0.00 9.31 0.00 0.00 0.00


Longitud de acero a lo largo

Longitud de acero a lo ancho y

1/2" 1 18 0.85 0.00 0.00 15.30 0.00 0.00 0.00

TERCER TRAMO

1/2" 1 6 2.31 0.00 0.00 13.84 0.00 0.00 0.00


Longitud de acero a lo largo

Longitud de acero a lo largo


1/2" 1 6 1.72 0.00 0.00 10.32 0.00 0.00 0.00

Longitud de acero a lo largo


1/2" 1 6 2.12 0.00 0.00 12.74 0.00 0.00 0.00

Longitud de acero a lo largo


1/2" 1 6 1.54 0.00 0.00 9.24 0.00 0.00 0.00

Longitud de acero a lo ancho y

1/2" 1 25 0.90 0.00 0.00 22.50 0.00 0.00 0.00

5/8" 2 7 1.43 0.00 0.00 0.00 19.99 0.00 0.00


Longitud de acero a lo largo

1/2" 2 8 4.37 0.00 0.00 69.93 0.00 0.00 0.00


Longitud de acero a lo largo

Escalera 1 -
Segundo y
Tercer piso
Longitud de acero a lo largo 1/2" 2 7 1.80 0.00 0.00 25.19 0.00 0.00 0.00

Escalera 1 -
Segundo y
Tercer piso

Longitud de acero a lo largo


1/2" 2 7 1.25 0.00 0.00 17.56 0.00 0.00 0.00

Longitud de acero a lo ancho

1/2" 2 24 1.05 0.00 0.00 50.40 0.00 0.00 0.00

Longitud de acero del descanso

1/2" 2 8 1.05 0.00 0.00 16.80 0.00 0.00 0.00

SUMATORIA (mt) 0.00 0.00 447.02 86.10 0.00 0.00


PESO NOMINAL (kg/mt) 0.250 0.560 0.994 1.552 2.235 3.973
TOTAL (kg) 0.00 0.00 444.34 133.62 0.00 0.00
Nro LONG FIERRO (Kg) PARCIAL
ITEM-DESCRIPCION TIPO Ø VECES PIEZA 1/4¨ 3/8¨ 1/2¨ 5/8¨ 3/4¨ 1¨ Kg
REFUERZO LONGITUDINAL DE TANQUE ELEVADO

3 1/2¨ 1 0.69 0.69 0.69

3 1/2¨¨ 2 2.8 5.6 5.6

3 1/2¨ 2 0.5 1 1

3 1/2¨ 1 2.94 2.94 2.94

3 1/2¨ 3 0.65 1.95 1.95

3 1/2¨ 2 0.2 0.4 0.4

3 1/2¨¨ 1 1.57 1.57 1.57

ACERO TRANSVERSAL PAREDES TANQUE ELEVADO

3 1/2¨¨ 3 0.64 1.92 1.92

3 1/2¨¨ 6 3.37 20.22 20.22

3 1/2¨¨ 1 0.49 0.49 0.49

3 1/2¨¨ 1 3.37 3.37 3.37

RESUMEN DE METRADO POR ø DE ACERO 1/4¨ 3/8¨ 1/2¨ 5/8¨ 3/4¨ 1¨


TOTAL (KG/TIPO DE ACERO) 0 0 12.2 0 0 12.2
TOTAL(KG/ACERO)+DESPERDICIO 0 0 12.8 0 0
ACERO EN LAS VARILLAS 0 0 45.2 0 0 12.8