JOB SAFETY ANALYSIS/ANALISIS DE SEGURIDAD DE TRABAJO

PROYECTO MULTI 38
Page / Pagina: 1 of 4
SUPERVISOR/FOREMAN - SUPERVISOR/CABO a CARGO del AREA:
COMPANY/COMPAÑÍA: SÍSTOLE CONSULTORÍA Y OBRAS, S.A. DE C.V. Revised form dated
ING GUSTAVO VARGAS
02 a 8 de mayo 2022 SAFTETY / SEGURIDAD a CARGO del AREA: PERSONS INVOLVED IN CREATING JSA:/ PERSONAS INVOLUCRADO EN CREAR AST:
DATE/ FECHA: JSA DAILY REVIEW and DISCUSSION with FIELD WORKERS
8 AM - 6 PM ADRIANA GONZÁLEZ GOVEA ING GUSTAVO VARGAS / ING. ADRIANA GOVEA (by initialing, you assure that the Job Safety Analysis (JSA)
has been reviewed and discussed with ALL the workers, PRIOR to
PROJECT / PROYECTO: LOCATION / UBICACION: commencing their tasks)
MULTIDIVISIONAL 38 FINSA PUEBLA
DESCRIPTION OF TASK TO BE PERFORMED / DESCRIPCION DE TAREA A REALIZAR: REVISION DIARIO del J.S.A. y DISCUSION con TRABAJADORES de
NIVELACIÓN DE VIALIDADES, ACARREO DE MATERIAL, ACABADOS CASETAS DE VIGILANCIA CAMPO
(al iniciar, usted asegura que el Analisis de Riesgo (JSA) ha sido revisado
DAILY GENERAL REQUIREMENTS DISCUSSED with WORKERS / REQUISITOS GENERALES DIARIO DISCUTIDO con los TRABAJADORES por las personas a cargo, y discutido con todos los trabajadores, ANTES
1. Aseguro que el Permiso de Trabajo y documentos asociados con la tarea ha sido debidamente completadas y SSOE notificado para firma. de comenzar sus tareas.)
2. Aseguro que TODO personal tiene sus DC3 asociados con la tarea. CUMPLIMIENTO REVISADO por SEGURIDAD
3. Aseguro que TODO personal tiene el E.P.P. requerido para la tarea y/o segun especificado en la hoja de datos de seguridad del producto (HDSM), si es que aplica. ( iniciales abajo )
4. Aseguro que TODO equipo motorizado, articulado, herramientas electricas y manuales, etc., han sido debidamente inspeccionadas, ANTES, de comenzar la tarea. FINSA FINSA FINSA FINSA FINSA FINSA FNSA
5. Aseguro que las areas se mantendran en Orden y Limpieza ANTE, DURANTE, y DESPUES de ejercer tareas. Inicial Inicial Inicial Inicial Inicial Inicial Inicial
Stop Work Conditions / Condiciones por Detener Trabajo 2-May 3-May 4-May 5-May 6-May 7-May 8-May
Change in Condition / Incident / Adjacent Work Hazard / riesgos de Evacuation / Civil Disturbance / Fire / Fuego Mon Tue Wed Thur Fri Sat Sun
Cambio en las Condiciones Incidente Trabajo adyacentes Evacuacion Disturbios Civiles Lun Mar Mier Jue Vie Sab Dom
Job Steps (with Details) / Potential Hazard / Mitigation (Elimination Steps) / CONT. CONT. CONT. CONT. CONT. CONT. CONT.
#
Pasos del Trabajo (con Detalles) Riesgos Potenciales Mitigacion (Pasos de Eliminacion) Inicial Inicial Inicial Inicial Inicial Inicial Inicial
HACER PREGUNTAS DIRIGIDAS PARA VERIFICAR SI SE COMPRENDIERON LOS
1 BIENVENIDA Y PLÁTICA DE SEGURIDAD (5 MINUTOS) QUE EL PERSONAL NO PONGA ATENCIÓN, NO LE INTERESE EN EL TEMA CONCEPTOS

2.1 A 2.4 SE REALIZA DE FORMA PAUSADA EVITANDO FORZAR LOS MÚSCULOS Y


2 CALENTAMIENTO (CALIXTECNIA) 2.1 TIRONES, 2.2 CALAMBRES, 2.3 ENFRIAMIENTOS, 2.4 DESGARRE MUSCULAR ARTICULACIONES

3.1 LAVADO DE MANOS, USO DE SANITIZANTE, USO DE CUBREBOCAS, DESINFECCIÓN


3 PROTOCOLO COVID-19 3.1 CONTAGIO DEL VIRUS SARS COV-2 EN EL CENTRO DE TRABAJO DE HERRAMIENTAS

4.1 Y 4.2 REVISAR EL ÁREA Y MANTENER ORDEN, IDENTIFICAR LOS CAMBIOS DE


NIVEL, 4.3 IDENTIFICAR Y CONTROLAR EL USO DE HERRAMIENTAS, REVISIÓN PREVIA
4.1 CAÍDAS POR TROPIEZO O DESNIVELES, 4.2 TORCEDURAS AL PISAR EN FALSO O DEL EQUIPO, 4.4 EVITAR MANTENER LA MALA POSTURA, TOMAR DESCANSOS Y
RESBALAR, 4.3 LASTIMARSE EN EL USO DE HERAMIENTAS MANUALES, 4.4 CAMINAR PAR ESTIRAR LAS PIERNAS, NO CARGAR MÁS DE 25 KG. 4.5 USO DE
4 COLOCACIÓN DE PISO CERÁMICO EN LAS DOS CASETAS ESFUERZOS O LASTIMADURAS POR MALAS POSTURAS 4.5 MACHUCONES POR CAÍDA CUBETAS O CARRETILLAS PARA EL TRANSPORTE DE MATERIAL Y HERRAMIENTAS
DE MATERIAL O DE HERRAMIENTAS

5.1 DISTENCIONES Y DESGARRES POR EL ESFUERZO FÍSICO AL CARGAR Y COLOCAR 5.1 DOBLAR LAS RODILLAS EN LUGAR DE LA ESPALDA AL LEVANTAR, SOSTENER Y
PANELES, 5.2 DOLOR DE ESPALDA POR CARGAR PANELES, 5.3 CAÍDAS AL SOSTENER CARGAR LOS PANELES. 5.2 APOYO DE AYUDANTES Y 8.3 REDUCIR AL MÍNIMO LOS
5 NIVELACIÓN Y COLOCACIÓN DE TABLAROCA EN LAS DOS CASETAS O LEVANTAR, CARGAR O SOSTENER LOS PANELES, 5.4 LASTIMARSE EN EL USO DE TRASLADOS DE LOS PANELES USAR CARRETILLAS Y AYUDANTES. 5.4 MANTENER EN
HERRAMIENTAS MANUALES ORDEN EL ÁREA DE TRABAJO, USO ADECUADO DE HERRAMIENTAS

6.1 MANEJO CORRECTO DE LA MAQUINARIA, 6.2 RESPETO A LOS LÍMITES DE


6 ACARREO DE MATERIAL (RETRO) PRODUCTO DE NIVELACIÓN DE VIALIDAD 6.1 VOLCADURA, 6.2 CHOQUE, 6.3 ATROPELLAMIENTO, 6.4 FALLA MECÁNICA VELOCIDAD Y ÁREAS DE CIRCULACIÓN, 6.3 EXTREMAR PRECAUCIONES EN ÁREA DE
PEATONES Y 6.4 REVISIÓN PREVIA

7.1 DELIMITACIÓN DEL ÁREA, 7.2 EVITAR MANIOBRAS INNECESARIAS Y RIESGOSAS, 7.3
7 COMPACTACIÓN DE MATERIAL CON VIBROCOMPACTADOR 7.1 ATROPELLAMIENTO, 7.2 VOLCADURA, 7.3 CHOQUE, 7.4 FALLA MECÁNICA MANTENER CONTACTO VISUAL CON LOS OPERADORES DENTRO DEL ÁREA Y 7.4
REVISIÓN PREVIA

NOM APLICABLES EN ACTIVIDADES: NOM STPS 030, 031, 018, 017, 004, 007 009 EN CASO DE LLUVIA SE SUSPENDE ACTIVIDAD DE
TERRACERÍAS Y MOVIMIENTO DE TIERRA

Nombre y Firma Nombre y Firma Nombre y Firma Nombre y Firma


SEGURIDAD FINSA SEGURIDAD CONTRATISTA CONSTRUCCIÓN FINSA CONSTRUCCIÓN CONTRATISTA

Prepared by Administrador 11/17/2023 Page 1


JOB SAFETY ANALYSIS/ANALISIS DE SEGURIDAD DE TRABAJO
Page / Pagina: 2 of 4
Consider the following: / Considere lo siguiente:
PERSONAL PROTECTIVE EQUIPMENT / HAZARDS (BODY)/ 0
WELDING / SOLDADURA ELECTRICAL/ELECTRICOS ACCESS / ACCESO
EQUIPO DE PROTECCIÓN PERSONAL RIESGOS (CUERPOS)
Normal PPE / EPP Normal Welding leads in good condition/ Fall Potential/ Locked/Tagged/ Scaffold (Properly Inspected)/
Safety Glasses, Safety Toe Boots, Hard Hat Cables de soldar en buenas condiciones Caida potencial Candado y Etiquetado Andamio (debidamente Inspeccionado)
Gloves, Long Sleeve Shirt / High Visible Vest Welding Blanket/ Pinch points/ Try Start/Stop switch/ Ladder (Tied-Off / Inspected)/
Gafas de seguridad, botas de seguridad, Guantes, Lona Contra-Chispas Puntos de Pellisco Switche prender/apagar Escalera (Atada / Inspeccionada)
Casco , Chaleco Alta-Visible, Camisa manga larga Grounding/ Slip/Trip Potential/ Ground Fault Current Personnel Basket (Inspected & Approved)/
Glove type(s)/ Coneccion a tierra Potencial de Resbalon/Tropiezo Interruptor / Interruptor Canasta Personal (Inspeccion y Apobado)
Guantes tipo(s) Welding Screens/ Line of Fire/ de Corriente Falla a Tierra Aerial Lift (Inspected & Approved)/
Glasses - Face Shield/ Mamparras Linea de Fuego Assured Grounding/ Plataforma Aerea (Inspeccion y Apobado)
Gafas / Cubre Cara Fire Extinguisher/ Crush by / Struck by/ Coneccion a Tierra
Hearing Protection (Ear plugs & Muffs)/ Extintor de incendios Aplastado por / Golpeado por con color correspondiente
Proteccion Auditiva Combustibles Removed/ Other/Otros Other/Otros
Fall Protection/ Combustibles Removidos
Proteccion contra caidas Fire Watch/
Reflective Vest/ Vigilante de Fuego
Chaleco Reflectivo
HAZARDS (ENVIRONMENTAL)
OTHER MISCELLANEOUS LIFTING / LEVANTAMIENTO TOOLS / HERRAMIENTAS RIESGOS (AMBIENTALES)

Barricadas / Signage Inspected/ Inspection Current/ Airbone Particles/ Noise/


Barricadas / Señalizacion Inspeccionado Inspeccion Corriente Particulas en el aire Ruido
Hole Covers/ Manual Lifting Equipment/ Proper tools for the job/ Electrical Shock/ Poor Access/Egress/
Tapas de Huecos Equipo de Carga Manual Herramientas adecuadas para el trabajo Descarga Electrica Acceso Inadecuado
Guardrails/ Proper rigging practices/ Tools en good working condition/ Heat Stress/ Sharp Objects/
Barandales Practicas apropiadas de amarre Herramientas en buenas condiciones Estres debido al calor Objetos filosos
Overhead work/ Manual Lifting (using legs) <50lbs./ Qualification requiered/ Heavy Objects/ Motorized Equipment/
Trabajo elevado Levantamiento manual Calificacion requerida Objetos Pesado Equipo Motorizado
Flagmen/Bandereros (utilizando piernas) Other / Otros Hot or Cold Surfaces/
Superficies Calientes o Frias
Other / Otros Inadecuate lighting/
Iluminacion Inadecuada

EVACUATION / EVACUACION

Nombre y Firma Nombre y Firma Muster Point/ MSDS on Site/


SEGURIDAD CONTRATISTA CONSTRUCCIÓN CONTRATISTA Punto de reunion MSDS en el sitio
Evacuation Route/ Eye wash/
Ruta de evacuacion Lavado de ojos
Wind Direction/ Fire Extinguishers/
Direccion del Viento Extintor de Fuego
Exit Signage/ Other/Otros
Señales de Salida

Prepared by Administrador 11/17/2023 Page 2


Page / Pagina: 3 of 4

THE JSA SHALL BE COMPLETED AT THE JOB SITE FOR EACH TASK. EACH MEMBER ASSOCIATED WITH THIS ASSIGNED TASK MUST PARTICIPATE IN REVIEWING AND COMPLETING THE JSA. THEN, PRINT NAME BELOW.
EL (JSA) SE COMPLETARÁ EN EL LUGAR DE TRABAJO PARA CADA UNA DE LAS TAREAS.
CADA UNO DE LOS MIEMBROS ASOCIADOS EN ESTA TAREA DEBEN PARTICIPAR EN REVISANDO Y COMPLETAR EL ANALISIS DE RIESGO (JSA). LUEGO, FIRMAR SU NOMBRE e' INICIAL ABAJO.
WITH MY SIGNATURE BELOW, I COMMIT TO THE FOLLOWING: I HAVE READ AND UNDERSTAND THE CONDITIONS AND HAZARDS DISCUSSED IN THE JSA OVERVIEW.
I FURTHER CONFIRM THAT I HAVE BEGUN THIS TASK INJURY FREE AND WILL REPORT ALL INCIDENTS, INJURIES AND NEAR MISSES TO MY SUPERVISOR SHOULD THEY OCCUR.
CON MI FIRMA ABAJO, YO ME COMPROMETO A LO SIGUIENTE: YO HE LEIDO y COMPRENDO LAS CONDICIONES Y LOS RIESGOS DISCUTIDOS EN EL (JSA).
YO CONFIRMO QUE HE COMENZADO ESTA TAREA LIBRE DE LESIONES y REPORTARE TODO INCIDENTE, LESION, Y UN "CASI INCIDENTE" A MI SUPERVISOR DE OCURRIR.

END OF DAY REVIEW: BY INITIALING NEXT TO MY NAME, 1) I CONFIRM THAT I WAS NOT INJURED TODAY, 2)IF I WAS INJURED IT WAS
PROPERLY REPORTED TO MY SUPERVISOR AND SAFETY REPRESENTATIVE.
REVISIÓN AL FIN DEL DÍA: AL FIRMAR MIS INICIALES JUNTO A MI NOMBRE, 1) CONFIRMO QUE NO ME LASTIME HOY, 2) SI ME LASTIME SE LE
INFORMÓ ADECUADAMENTE A MI SUPERVISOR Y AL REPRESENTANTE DE SEGURIDAD
PRINT NAME / Initial / PRINT NAME / Initial / PRINT NAME / Initial / PRINT NAME / Initial /
ESCRIBA SU NOMBRE Iniciales ESCRIBA SU NOMBRE Iniciales ESCRIBA SU NOMBRE Iniciales ESCRIBA SU NOMBRE Iniciales
DAY 1 DAY 2 DAY 3 DAY 4

Nombre y Firma Nombre y Firma


SEGURIDAD CONTRATISTA CONSTRUCCIÓN CONTRATISTA

Prepared by Administrador 11/17/2023 Page 3


Page / Pagina: 4 of 4
PRINT NAME / Initial / PRINT NAME / Initial / PRINT NAME / Initial /
ESCRIBA SU NOMBRE Iniciales ESCRIBA SU NOMBRE Iniciales ESCRIBA SU NOMBRE Iniciales
DAY 5 DAY 6 DAY 7

Nombre y Firma Nombre y Firma


SEGURIDAD CONTRATISTA CONSTRUCCIÓN CONTRATISTA

Prepared by Administrador 11/17/2023 Page 4