Está en la página 1de 3

PROJECT: PEMUCO3

REV 01
ELECTRICAL INSTRUMENTATION INSTALLATION ERECTION
AUTHOR: LWE
Documents constituting the request for quotation DATE: 11/07/2022

Document Num Doc. Rev. Description STATUS


1. Standards conditions for Works
PEMUCO3-VA-SPX-0004 01 Standards conditions for Standard Conditions for Works-Eqt supply&sup.serv
PEMUCO3-VA-SPX-0005 01 Standards conditions for Works - Site Works CH
2. Breakdown of the ORDER PRICE
BOQ for Electrical Instrumentation Automation Installation Works
PEMUCO3-EE-BOQ-0002 02
3. Technical specifications
31. Environment, health and safety (EHS) & Site rules
- 03 BENEO CHILE - GUÍA HSE PARA CONTRATISTAS
Programa HSE- Project EECC
- - Requerimiento Medio Ambiente ORAFTI
Anexo 1a - Anexo 1a Disposiciones de Seguridad y Medio Ambiente para Empresas Contratistas
Anexo 1b - Anexo 1b Requisitos de Ingreso EE.CC
Anexo 2 - Anexo 2 Diptico de ingreso
Anexo 3 - Anexo 3 Programa de Inducción para Empresas Contratistas
Anexo 4 Disposiciones de Seguridad y Medio Ambiente para empresas
Anexo 4 -
contratistas
- Anexo 5 Reglamento de Contratistas y Subcontratistas Orafti
- Instructivo Aislación, bloqueo y verificación de energías LOTO
- Instructivo Código de colores
- Procedimiento Control de Acceso Orafti
- Procedimientos de andamios
- SEG-01-I-02 Ingreso a Espacios Confinados
- SEG-01-I-04 Intervencion de Equipos Energizados o en Operación
- SEG-01-I-06 Intervención y Manipulación en líneas con productos químicos
- SEG-01-I-07 Intervención y Manipulación en líneas con temperaturas
Anexo 5
- SEG-01-I-08 Intervención y manipulación en líneas presurizadas
- SEG-01-I-09 Soldadura, Corte y Oxicorte
- SEG-01-I-10 Trabajo con Fuentes Radiactivas
- SEG-01-I-11 Trabajos en Altura
- SEG-01-I-13 Permiso de Trabajo
- SEG-01-I-13-R1 Permiso Diario de Trabajo
- SEG-01-I-19 Equipos de Proteccion Personal
- SEG-01-I-21 Instructivo Operación de grúa horquilla
- SEG-01-I-22 Atención de Lesionados, uso y manejo de ambulancia
Anexo 6 - Anexo 6 Información Legal Ambiental a Cumplir En etapa de construcción
- Instructivo PPR-05 Almacenamiento de sustancias peligrosas
Anexo 7 - PPR-05 Manejo de Productos Quimicos _Rev
- PPR-06 Manejo de Desechos
- check list Covid-19
- Estándar Emergencia Sanitaria COVID OCT 20
- Formulario-Único-de-Fiscalización-Covid19-FINAL-FINAL-
Covid - Guía autocuidado
- PER-01-R1 Capacitacion del Personal (Rev.02)
- Protocolo de Acción Covid-19 r.6 OCT 20
- Anexo 8 Informe de Cumplimiento Legal - ORAFTI
32. General technical specifications
PEMUCO3-BA-MSC-0001 00 Z00 Site Organisation & Documentation
PEMUCO3-CX-SPX-0006 02 General Site installation
PEMUCO3-SA-IST-0001 01 Packing Instructions
PEMUCO3-SA-IST-0002 01 Marking Instructions
PEMUCO3-AA-BOD-0002 05 Marking and Documentation Obligations
33. General Electrical Specifications
Basic Engineering
PEMUCO3-EX-SPX-0002 07
Electricity & intrumentation
BENEO_ORAFTI_EHEDG_Specifications
Beneo Spec
Refinery II Project Comments Applicable also for
05_BuildingElectricity
General Requirements PEMUCO3 Project
Utilities & Building Electricity
Beneo Spec
Comments Applicable also for
06_Cabling Refinery II Project
PEMUCO3 Project
Specification for Low Voltage
Beneo Spec
07_General_Requirements_Instru Comments Applicable also for
Refinery II Project
mentation PEMUCO3 Project
Instrumentation
SZ Group Spec
120_Cable Installation Systems
V2.0 120 - Engineering Standards
and Cabling_V2.0
Cable Installation Systems and Cabling
EHEDG.DOC_44_E_2014_Order_417788 - Electrical installations
EHEDG.DOC_44_E_2014_Order_417788 - Lighting
PROJECT: PEMUCO3
REV 01
ELECTRICAL INSTRUMENTATION INSTALLATION ERECTION
AUTHOR: LWE
Documents constituting the request for quotation DATE: 11/07/2022

34. Particular Specification


Technical Specification
PEMUCO3-EE-SPX-0003 01 Electrical instrumentation Automation
Installation Works
35. List
PEMUCO3-EE-LST-0001 05 Electrical Consumer List
PEMUCO3-EE-LST-0004 01 Electrical and Instrumentation List
PEMUCO3-EI-LST-0001 05 Instrument List & IO List
36. Drawing
361. Field Layout
PEMUCO3-EE-DWL-0013 01 Z00.00 GENERAL ELECTRICAL ZONES LAYOUT (ID 143836)
PEMUCO3-EE-DWL-0009 01 Z05.00 ELECTRICAL EQUIIPMENT LAYOUT (ID 181521)
PEMUCO3-EE-DWL-0011 01 Z07B -Z08 ELECTRICAL EQUIPMENT LAYOUT (ID 181618)

PEMUCO3-EE-DWL-0014 01 Z10 Z11 Z14 ELECTRICAL EQUIPMENT LAYOUT (ID 181537)

PEMUCO3-EE-DWL-0039 WIP Z10B ELECTRICAL EQUIPMENT LAYOUT


PEMUCO3-MX-DWL-0004 04 Z10B-EQUIPMENT LAYOUT (ID 155496)

PEMUCO3-EE-DWL-0016 01 Z15 ELECTRICAL EQUIPMENT LAYOUT

PEMUCO3-EE-DWL-0018 01 Z16A.00 ELECTRICAL EQUIPMENT LAYOUT

PEMUCO3-EE-DWL-0035 WIP Z19.00 ELECTRICAL EQUIPMENT LAYOUT


PEMUCO3-MX-DWL-0008 01 Z19-EQUIPMENT LAYOUT (ID 97137)

PEMUCO3-EE-DWL-0036 WIP Z20D.00 ELECTRICAL EQUIPMENT LAYOUT


PEMUCO3-MX-DWL-0026 02 Z20D - Powder Handling Layout 3D (ID 168084)

PEMUCO3-EE-DWL-0020 01 Z20C.00 ELECTRICAL EQUIPMENT LAYOUT

PEMUCO3-EE-DWL-0038 WIP Z22 Z23 ELECTRICAL EQUIPMENT LAYOUT


PEMUCO3-MX-DWL-0009 01 Z22-EQUIPMENT LAYOUT (ID 97170)

PEMUCO3-EE-DWL-0037 WIP Z28.00 ELECTRICAL EQUIPMENT LAYOUT


PEMUCO3-CW-DWG-0005 05 Z28 SALT STORAGE - PLAN VIEWS (ID 146793)
PEMUCO3-CW-DWG-0006 05 Z28 SALT STORAGE - Elevation views (ID 146795)

362. New Single Line Diagramme and Substation Layout


PEMUCO3-EE-DWL-0028 01 Z05.00 ELECTRICAL SUBSTATION LAYOUT
PEMUCO3-EE-DWL-0027 01 Z03.00 ELECTRICAL SUBSTATION LAYOUT
PEMUCO3-EE-SLD-0001 02 Z05.00 TGBT05 MODIFICATIONS

PEMUCO3-EE-DWL-0029 01 Z06.00 ELECTRICAL SUBSTATION LAYOUT


PEMUCO3-EE-SLD-0002 02 Z06.00 TGBT06 MODIFICATIONS

PEMUCO3-EE-DWL-0030 01 Z10.00 ELECTRICAL SUBSTATION LAYOUT


PEMUCO3-EE-SLD-0003 02 Z10A.00 TGBT10A MODIFICATIONS

PEMUCO3-EE-DWL-0031 01 Z15.00 ELECTRICAL SUBSTATION LAYOUT (Working Copy)


PEMUCO3-EE-SLD-0004 02 Z15.00 TGBT15 MODIFICATIONS

PEMUCO3-EE-DWL-0032 01 Z16.00 ELECTRICAL SUBSTATION LAYOUT (Working Copy)


PEMUCO3-EE-SLD-0005 02 Z16A.00 TGBT16A MODIFICATIONS

PEMUCO3-EE-SLD-0006 02 Z16B.00 TGBT16B MODIFICATIONS

PEMUCO3-EE-DWL-0033 01 Z19.00 ELECTRICAL SUBSTATION LAYOUT (Working Copy)


PEMUCO3-EE-SLD-0007 02 Z19.00 TGBT19 MODIFICATIONS

PEMUCO3-EE-SLD-0008 02 Z23.00 TGBT23 MODIFICATIONS

PEMUCO3-EE-SLD-0010 02WIP Z26B.00 TGBT26B MODIFICATIONS

363. Existing TGBT Electrical Wiring Diagram PDF Format, Not As built Drawing
ORAFTI_TBT03_AB
ORAFTI_TGBT05_AB
ORAFTI_TGBT06_AB
ORAFTI_TGBT10_AB
ORAFTI_TGBT15_AB
ORAFTI_TGBT16_AB
ORAFTI_TGBT19_AB
ORAFTI_TGBT23_AB
ORAFTI_TGBT40_AB
PROJECT: PEMUCO3
REV 01
ELECTRICAL INSTRUMENTATION INSTALLATION ERECTION
AUTHOR: LWE
Documents constituting the request for quotation DATE: 11/07/2022

364. underground Earthing Layout


PEMUCO3-EE-DWL-0022 02 Z05.00 UNDERGROUND EARTHING LAYOUT (ID 172703)
PEMUCO3-EE-DWL-0023 02 Z05.00 PREWASHING DRUM EARTHING LAYOUT (ID 176299)
PEMUCO3-EE-DWL-0024 02 Z05.00 SCREEN WASHER EARTHING LAYOUT (ID 176302)

PEMUCO3-EE-DWL-0025 WIP Z07B DIFFUSION EARTHING LAYOUT

PEMUCO3-EE-DWL-0002 02 Z10B.00 PRESS FILTERS EARTHING LAYOUT (ID 111569)

PEMUCO3-EE-DWL-0008 02 Z15.00 - HP PLANT EARTHING LAYOUT (ID 132682)

PEMUCO3-EE-DWL-0007 02 Z20C.00 FINISHED LIQUID STORAGE EARTHING LAYOUT (ID 130247)

PEMUCO3-EE-DWL-0005 02 Z20D.00 BAGGING STATION EARTHING LAYOUT (Working Copy) (ID 111542)

PEMUCO3-EE-DWL-0006 02 Z22.00 LIQUID STORAGE EARTHING LAYOUT (ID 157748)

PEMUCO3-EE-DWL-0026 WIP Z28 SALT STORAGE EARTHING LAYOUT

365. Typical Electrical Wiring Diagram


PEMUCO3-EE-ELD-0006 01 TYP ELECT WIRING DIAGRAM - DOL STARTER
PEMUCO3-EE-ELD-0007 01 TYP ELECT WIRING DIAGRAM - VSD STARTER
PEMUCO3-EE-ELD-0008 01 TYP ELECT WIRING DIAGRAM - VSD 2M STARTER
PEMUCO3-EE-ELD-0009 01 TYP ELECT WIRING DIAGRAM - VSD 9M STARTER
PEMUCO3-EE-ELD-0010 01 TYP ELECT WIRING DIAGRAM - REV STARTER
PEMUCO3-EE-ELD-0011 01 TYP ELECT WIRING DIAGRAM - REV-CM STARTER
4. Time - Documentation Schedule
PEMUCO3-AA-TSC-0027 01 EEC Electrical Erection Time Schedule
Linea de tiempo y areas
5. Standards Norms & General Codes
PEMUCO3-AA-BOD-0003 01 Standards and Codes
Site and Climate Data
PEMUCO3-AA-BOD-0001 05 Site & Climate Data

También podría gustarte