Está en la página 1de 42

GOBIERNO REGIONAL DEL CUSCO

PROYECTO ESPECIAL REGIONAL PLAN COPESCO


OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

TABLA DE CONTENIDO

1 DATOS GENERALES............................................................................................................2
1.1 NOMBRE DEL PROYECTO:........................................................................................2
1.2 UBICACIÓN GEOGRÁFICA:........................................................................................2
2 DELIMITACION DE CUENCAS............................................................................................2
2.1 OBTENCION DE DATOS GEOMETRICOS DE LAS CUENCAS Y
MICROCUENCAS DE LA ZONA.............................................................................................2
2.2 DATOS DE PRECIPITACION DE ESTACIONES METEOROLOGICAS DE LA
REGION CUSCO.......................................................................................................................3
2.3 OBTENCION DE CAUDALES MAXIMOS DE DISEÑO..........................................12
2.3.1 MÉTODO RACIONAL..........................................................................................12
2.4 TABLA DE RESULTADOS:.........................................................................................15
3 DRENAJE VIAL....................................................................................................................16
3.1 DRENAJE TRANSVERSAL........................................................................................16
3.1.1 ALCANTARILLAS.................................................................................................16
3.1.2 TABLA DE RESULTADOS..................................................................................20
3.2 DRENAJE LONGITUDINAL........................................................................................34
3.2.1 CUNETAS..............................................................................................................35
4 CONCLUSIONES.................................................................................................................40
5 RECOMENDACIONES........................................................................................................41

1
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

DETERMINACION DE CAUDALES MAXIMOS PARA LAS CUENCAS COMPRENDIDAS ENTRE


LOS DISTRITOS DE ZURITE Y HUAROCONDO DE LA PROVINCIA DE ANTA REGION
CUSCO.

17

Ramuschaca 1
Miskipujio 3 2
13 4
5
11 10 Chilcahuaycco
6
12 7
14

15

1 DATOS GENERALES
1.1 NOMBRE DEL PROYECTO:
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN LA
VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE ANTA,
REGION CUSCO”

CU Nº 2491244

1.2 UBICACIÓN GEOGRÁFICA:


Las cuencas y microcuencas están ubicadas a 30km aproximadamente de la ciudad del Cusco
entre los distritos de Zurite y Huarocondo de la provincia de Anta, Región Cusco.

2 DELIMITACION DE CUENCAS

2.1 OBTENCION DE DATOS GEOMETRICOS DE LAS CUENCAS Y MICROCUENCAS DE


LA ZONA.
Para la obtención de los datos geométricos de las cuencas en mención se utilizaron los programas
como el Google Earth Pro, Global Mapper y AutoCad Civil 3D.

Obteniéndose de esta manera el siguiente cuadro de datos.

2
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Ancho Medio
Nro Nombre Area_m2 Area_Has Lon Rio_mt Cota Menor Cota Mayor Pendiente Perimetro_mt
Cuenca
1 484,456 48.45 1,733 3,344 3,800 0.263 484,456 380
2 190,864 19.09 1,025 3,330 3,643 0.305 190,864 230
3 606,194 60.62 1,583 3,335 4,020 0.433 606,194 323
4 384,627 38.46 1,182 3,331 3,861 0.448 384,627 272
5 483,112 48.31 1,580 3,332 3,885 0.350 483,112 324
6 174,201 17.42 602 3,336 3,613 0.460 174,201 267
7 385,022 38.50 1,127 3,356 3,740 0.341 385,022 340
8 Miskipujio 1,448,157 144.82 2,281 3,368 4,304 0.410 1,448,160 735
9 Chillcahuaycco 341,963 34.20 945 3,375 3,946 0.604 341,963 282
10 403,962 40.40 1,463 3,382 4,270 0.607 403,962 237
11 1,201,820 120.18 2,630 3,388 4,355 0.368 1,201,820 532
12 948,519 94.85 2,616 3,390 4,345 0.365 948,519 456
13 2,558,342 255.83 3,570 3,400 4,488 0.305 2,558,340 903
14 1,286,609 128.66 2,662 3,410 4,425 0.381 1,286,610 737
15 540,386 54.04 1,495 3,398 3,828 0.288 540,386 550
16 Ramuschaca 5,179,652 517.97 5,004 3,403 4,488 0.217 5,179,650 1,428
17 4,836,780 483.68 4,528 3,341 4,412 0.237 4,836,780 1,453

2.2 DATOS DE PRECIPITACION DE ESTACIONES METEOROLOGICAS DE LA REGION


CUSCO.
Para el presente trabajo se utilizaron los datos de la estación meteorológica denominada
ANCACHURO ubicada en el distrito de Zurite, Provincia de Anta, Región Cusco; obteniéndose de
estas una base de datos de precipitaciones mensuales desde el año 1999 hasta el año 2018
otorgadas por el SENAMHI como se muestra en el siguiente cuadro.

Con esta información se determina que la precipitación máxima en 24h para las cuencas es de

54.30mm.

3
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Precipitaciones máximas para diferentes tiempos de duración de lluvias.

Tiempo de Precipitación máxima Pd (mm) por tiempos de duración


Cociente
Duración 2 años 5 años 10 años 25 años 50 años 100 años 500 años
24 hr X24 39.4644 48.3140 54.1732 61.5764 67.0684 72.5200 85.1176
18 hr X18 = 91% 35.5179 43.4826 48.7559 48.6453 60.3616 65.2680 76.6058
12 hr X12 = 80% 31.1769 38.1681 42.7968 48.6453 52.9841 57.2908 67.2429
8 hr X8 = 68% 25.2572 30.9210 34.6709 39.4089 42.9238 46.4128 54.4752
6 hr X6 = 61% 22.1001 27.0558 30.3370 34.4828 37.5583 40.6112 47.6658
5 hr X5 = 57% 19.7322 24.1570 27.0866 30.7882 33.5342 36.2600 42.5588
4 hr X4 = 52% 17.3643 21.2582 23.8362 27.0936 29.5101 31.9088 37.4517
3 hr X3 = 46% 14.9965 18.3593 20.5858 23.3990 25.4860 27.5576 32.3447
2 hr X2 = 39% 12.2340 14.9773 16.7937 19.0887 20.7912 22.4812 26.3864
1 hr X1 = 30% 9.8661 12.0785 13.5433 15.3941 16.7671 18.1300 21.2794

Intencidades de lluvia a partir del Pd, según duracion de precipitaciones y frecuencia de la


misma

Tiempo de duración Intensidad de la lluvia (mm /hr) según el Periodo de Retorno


Hr min 2 años 5 años 10 años 25 años 50 años 100 años 500 años
24 hr 1440 1.6443 2.0131 2.2572 2.5657 2.7945 3.0217 3.5466
18 hr 1080 1.9732 2.4157 2.7087 2.7025 3.3534 3.6260 4.2559
12 hr 720 2.5981 3.1807 3.5664 4.0538 4.4153 4.7742 5.6036
8 hr 480 3.1572 3.8651 4.3339 4.9261 5.3655 5.8016 6.8094
6 hr 360 3.6833 4.5093 5.0562 5.7471 6.2597 6.7685 7.9443
5 hr 300 3.9464 4.8314 5.4173 6.1576 6.7068 7.2520 8.5118
4 hr 240 4.3411 5.3145 5.9591 6.7734 7.3775 7.9772 9.3629
3 hr 180 4.9988 6.1198 6.8619 7.7997 8.4953 9.1859 10.7816
2 hr 120 6.1170 7.4887 8.3969 9.5443 10.3956 11.2406 13.1932
1 hr 60 9.8661 12.0785 13.5433 15.3941 16.7671 18.1300 21.2794

Representación matemática de las curvas Intensidad - Duración - Período de retorno:

K⋅T m
I= n
t
en la cual:
I= Intensidad (mm/hr)
Duración de la lluvia
t=
(min)
Período de retorno
T=
(años)
K, m, n = Parámetros de ajuste

Realizando un cambio de variable: m


d=K⋅T
d 4
I= n
⇒ I =d⋅t −n
t
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Con lo que de la anterior expresión se obtiene:

Periodo de retorno para T = 2 años


Nº x y ln x ln y ln x*ln y (lnx)^2
1 1440 1.6443 7.2724 0.4973 3.6169 52.8878
2 1080 1.9732 6.9847 0.6797 4.7473 48.7863
3 720 2.5981 6.5793 0.9548 6.2817 43.2865
4 480 3.1572 6.1738 1.1497 7.0978 38.1156
5 360 3.6833 5.8861 1.3038 7.6744 34.6462
6 300 3.9464 5.7038 1.3728 7.8302 32.5331
7 240 4.3411 5.4806 1.4681 8.0463 30.0374
8 180 4.9988 5.1930 1.6092 8.3565 26.9668
9 120 6.1170 4.7875 1.8111 8.6705 22.9201
10 60 9.8661 4.0943 2.2891 9.3724 16.7637
10 4980 42.3256 58.1555 13.1356 71.6939 346.9435
Ln (d) = 4.4395 d= 84.7359 n= -0.5375

Serie T= 2 años
Regresión T= 2 años x y
1440 1.6443
Intensidad (mm/hr)

12 1080 1.9732
10 y = 27,4095x-0,6164 720 2.5981
8
R² = 0,999 480 3.1572
6
360 3.6833
4
2
300 3.9464
0 240 4.3411
0 200 400 600 800 1000 1200 1400 1600 180 4.9988
Duración (m in) 120 6.1170
60 9.8661
I Vs. t Potencial (I Vs. t)

5
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Periodo de retorno para T = 5 años


Nº x y ln x ln y ln x*ln y (lnx)^2
1 1440 2.0131 7.2724 0.6997 5.0883 52.8878
2 1080 2.4157 6.9847 0.8820 6.1604 48.7863
3 720 3.1807 6.5793 1.1571 7.6128 43.2865
4 480 3.8651 6.1738 1.3520 8.3469 38.1156
5 360 4.5093 5.8861 1.5061 8.8653 34.6462
6 300 4.8314 5.7038 1.5751 8.9842 32.5331
7 240 5.3145 5.4806 1.6704 9.1551 30.0374
8 180 6.1198 5.1930 1.8115 9.4072 26.9668
9 120 7.4887 4.7875 2.0134 9.6391 22.9201
10 60 12.0785 4.0943 2.4914 10.2008 16.7637
10 4980 51.8168 58.1555 15.1588 83.4601 346.9435
Ln (d) = 4.6419 d= 103.7374 n= -0.5375

Serie T= 5 años
Regresión T= 5 años x y
1440 2.0131
Intensidad (mm/hr)

16 1080 2.4157
12 720 3.1807
y = 103.7374x-0.5375
R² = 0.9948
480 3.8651
8
360 4.5093
4 300 4.8314
0
240 5.3145
0 200 400 600 800 1000 1200 1400 1600 180 6.1198
Duración (m in) 120 7.4887
60 12.0785
I vs T Potencial (I vs T)

Periodo de retorno para T = 10 años


Nº x y ln x ln y ln x*ln y (lnx)^2
1 1440 2.2572 7.2724 0.8141 5.9207 52.8878
2 1080 2.7087 6.9847 0.9965 6.9600 48.7863
3 720 3.5664 6.5793 1.2716 8.3659 43.2865
4 480 4.3339 6.1738 1.4665 9.0536 38.1156
5 360 5.0562 5.8861 1.6206 9.5391 34.6462
6 300 5.4173 5.7038 1.6896 9.6371 32.5331
7 240 5.9591 5.4806 1.7849 9.7825 30.0374
8 180 6.8619 5.1930 1.9260 10.0016 26.9668
9 120 8.3969 4.7875 2.1279 10.1871 22.9201
10 60 13.5433 4.0943 2.6059 10.6694 16.7637
10 4980 58.1008 58.1555 16.3035 90.1169 346.9435
Ln (d) = 4.7563 d= 116.3180 n= -0.5375

6
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Serie T= 10 años
Regresión T= 10 años x y
1440 2.2572
Inte nsidad (mm/hr)

16 1080 2.7087

12 720 3.5664
y = 116.3180x-0.5375
R² = 0.9948 480 4.3339
8
360 5.0562
4 300 5.4173

0 240 5.9591
0 200 400 600 800 1000 1200 1400 1600 180 6.8619

Duración (m in) 120 8.3969


60 13.5433
I vs T Potencial (I vs T)

Periodo de retorno para T = 25 años


Nº x y ln x ln y ln x*ln y (lnx)^2
1 1440 2.5657 7.2724 0.9422 6.8522 52.8878
2 1080 2.7025 6.9847 0.9942 6.9441 48.7863
3 720 4.0538 6.5793 1.3996 9.2086 43.2865
4 480 4.9261 6.1738 1.5945 9.8444 38.1156
5 360 5.7471 5.8861 1.7487 10.2930 34.6462
6 300 6.1576 5.7038 1.8177 10.3677 32.5331
7 240 6.7734 5.4806 1.9130 10.4845 30.0374
8 180 7.7997 5.1930 2.0541 10.6668 26.9668
9 120 9.5443 4.7875 2.2559 10.8003 22.9201
10 60 15.3941 4.0943 2.7340 11.1939 16.7637
10 4980 65.6644 58.1555 17.4540 96.6556 346.9435
Ln (d) = 4.9728 d= 144.4345 n= -0.5550

Serie T= 25 años
Regresión T= 25 años x y
1440 2.5657
Intensidad (mm/hr)

20 1080 2.7025
16 720 4.0538
y = 144.4345x-0.5550
12 R² = 0.9900 480 4.9261
8 360 5.7471
4 300 6.1576

0 240 6.7734
0 200 400 600 800 1000 1200 1400 1600 180 7.7997
Duración (m in) 120 9.5443
60 15.3941
I vs T Potencial (I vs T)

7
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Periodo de retorno para T = 50 años


Nº x y ln x ln y ln x*ln y (lnx)^2
1 1440 2.7945 7.2724 1.0277 7.4736 52.8878
2 1080 3.3534 6.9847 1.2100 8.4514 48.7863
3 720 4.4153 6.5793 1.4851 9.7707 43.2865
4 480 5.3655 6.1738 1.6800 10.3719 38.1156
5 360 6.2597 5.8861 1.8341 10.7959 34.6462
6 300 6.7068 5.7038 1.9031 10.8550 32.5331
7 240 7.3775 5.4806 1.9984 10.9527 30.0374
8 180 8.4953 5.1930 2.1395 11.1104 26.9668
9 120 10.3956 4.7875 2.3414 11.2094 22.9201
10 60 16.7671 4.0943 2.8194 11.5437 16.7637
10 4980 71.9309 58.1555 18.4387 102.5346 346.9435
Ln (d) = 4.9699 d= 144.0059 n= -0.5375

Serie T= 50 años
Regresión T= 50 años x y
1440 2.7945
Intensidad (mm/hr)

20 1080 3.3534
15 720 4.4153
y = 144.0059x-0.5375
R² = 0.9948 480 5.3655
10
360 6.2597
5 300 6.7068
0 240 7.3775
0 200 400 600 800 1000 1200 1400 1600 180 8.4953
Duración (m in) 120 10.3956
60 16.7671
I vs T Potencial (I vs T)

Periodo de retorno para T = 100 años


Nº x y ln x ln y ln x*ln y (lnx)^2
1 1440 3.0217 7.2724 1.1058 8.0419 52.8878
2 1080 3.6260 6.9847 1.2881 8.9972 48.7863
3 720 4.7742 6.5793 1.5632 10.2849 43.2865
4 480 5.8016 6.1738 1.7581 10.8543 38.1156
5 360 6.7685 5.8861 1.9123 11.2559 34.6462
6 300 7.2520 5.7038 1.9813 11.3008 32.5331
7 240 7.9772 5.4806 2.0766 11.3810 30.0374
8 180 9.1859 5.1930 2.2177 11.5162 26.9668
9 120 11.2406 4.7875 2.4195 11.5835 22.9201
10 60 18.1300 4.0943 2.8976 11.8636 16.7637
10 4980 77.7776 58.1555 19.2202 107.0794 346.9435
Ln (d) = 5.0480 d= 155.7111 n= -0.5375

8
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Serie T= 100 años


Regresión T= 100 años x y
1440 3.0217
Intensidad (mm/hr)

45 1080 3.6260
40
35 720 4.7742
y = 155.7111x-0.5375
30 480 5.8016
25 R² = 0.9948
20 360 6.7685
15
10 300 7.2520
5 240 7.9772
0
0 200 400 600 800 1000 1200 1400 1600 180 9.1859
120 11.2406
Duración (m in)
60 18.1300
I vs T Potencial (I vs T)

Periodo de retorno para T = 500 años


Nº x y ln x ln y ln x*ln y (lnx)^2
1 1440 3.5466 7.2724 1.2660 9.2067 52.8878
2 1080 4.2559 6.9847 1.4483 10.1160 48.7863
3 720 5.6036 6.5793 1.7234 11.3387 43.2865
4 480 6.8094 6.1738 1.9183 11.8432 38.1156
5 360 7.9443 5.8861 2.0725 12.1987 34.6462
6 300 8.5118 5.7038 2.1414 12.2144 32.5331
7 240 9.3629 5.4806 2.2368 12.2589 30.0374
8 180 10.7816 5.1930 2.3778 12.3480 26.9668
9 120 13.1932 4.7875 2.5797 12.3503 22.9201
10 60 21.2794 4.0943 3.0577 12.5194 16.7637
10 4980 91.2886 58.1555 20.8219 116.3943 346.9435
Ln (d) = 5.2082 d= 182.7601 n= -0.5375

Serie T= 500 años


x y
Regresión T= 500 años
1440 3.5466
50 1080 4.2559
Intensidad (mm/hr)

45
40 720 5.6036
35
30 y = 182.7601x-0.5375 480 6.8094
25 R² = 0.9948 360 7.9443
20
15 300 8.5118
10
5 240 9.3629
0
0 200 400 600 800 1000 1200 1400 1600 180 10.7816
120 13.1932
Duración (min)
60 21.2794
Series1 Potencial (Series1)

9
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Resumen de aplicación de regresión potencial


Periodo de Término ctte. de Coef. de
Retorno (años) regresión (d) regresión [n]
2 84.73592616062 -0.53752143702
5 103.73737860529 -0.53752143702
10 116.31799349459 -0.53752143702
25 144.43453771834 -0.55496493933
50 144.00592775546 -0.53752143702
100 155.71114930529 -0.53752143702
500 182.76012941375 -0.53752143702
Promedio = 133.10043463619 -0.54001336592

En función del cambio de variable realizado, se realiza otra regresión de potencia entre las
columnas del periodo de retorno (T) y el término constante de regresión (d), para obtener valores
de la ecuación:
m
d=K⋅T
Regresión potencial
Nº x y ln x ln y ln x*ln y (lnx)^2
1 2 84.7359 0.6931 4.4395 3.0773 0.4805
2 5 103.7374 1.6094 4.6419 7.4708 2.5903
3 10 116.3180 2.3026 4.7563 10.9518 5.3019
4 25 144.4345 3.2189 4.9728 16.0069 10.3612
5 50 144.0059 3.9120 4.9699 19.4422 15.3039
6 100 155.7111 4.6052 5.0480 23.2469 21.2076
7 500 182.7601 6.2146 5.2082 32.3668 38.6214
7 692 931.7030 22.5558 34.0366 112.5627 93.8667
Ln (K) = 4.4231 K= 83.3584 m= 0.1363

Termino constante de regresión (K) = 83.3584

Coef. de regresión (m) = 0.1363

10
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

La ecuación de intensidad válida para la cuenca resulta:

Donde:
I = intensidad de precipitación
(mm/hr)
T = Periodo de Retorno (años)
t = Tiempo de duración de precipitación (min)

11
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Tabla de intensidades - Tiempo de duración


Frecuencia Duración en minutos
años 5 10 15 20 25 30 35 40 45 50 55 60
2 38.42 26.42 21.23 18.17 16.11 14.60 13.43 12.50 11.73 11.08 10.52 10.04
5 43.53 29.94 24.05 20.59 18.25 16.54 15.22 14.16 13.29 12.55 11.92 11.38
10 47.84 32.90 26.43 22.63 20.06 18.18 16.73 15.56 14.60 13.80 13.11 12.50
25 54.21 37.28 29.95 25.64 22.73 20.60 18.95 17.63 16.55 15.63 14.85 14.17
50 59.58 40.98 32.92 28.18 24.98 22.64 20.83 19.38 18.19 17.18 16.32 15.57
100 65.48 45.04 36.18 30.97 27.46 24.88 22.90 21.30 19.99 18.88 17.94 17.11
500 81.54 56.08 45.05 38.57 34.19 30.99 28.51 26.53 24.89 23.52 22.34 21.31

2.3 OBTENCION DE CAUDALES MAXIMOS DE DISEÑO.


2.3.1 MÉTODO RACIONAL

se utiliza en hidrología para determinar el Caudal Instantáneo Máximo de descarga de una cuenca


hidrográfica.

La fórmula a utilizar:

12
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

Donde:

 Q= Caudal máximo expresado en m3/s.

 C= Coeficiente de escurrimiento (o coeficiente de escorrentía). 

 I= Intensidad de la precipitación concentrada en mm/hr en un período igual al tiempo de


concentración tc.

 A= Área de la cuenca hidrográfica en Ha.

COEFICIENTE DE ESCORRENTIA: segun Norma OS – 060 del R.N.E. (DRENAGE PLUVIAL


URBANO)

Consideramos el tipo de terreno como área de pastizales, pendientes superiores a 7% y un


periodo de retorno de 25 años, por lo tanto el coeficiente de escorrentia a tomar tendra un
valor de 0.46
Tabla 1.a
Coeficientes de escorrentía para ser utilizados en el Método Racional
CARACTERISTICAS DE LA PERIODO DE RETORNO (AÑOS)
SUPERFICIE 2 5 10 25 50 100 500
AREAS NO DESARROLLADAS
Área de cultivos
Plano 0 - 2 % 0.31 0.34 0.36 0.40 0.43 0.47 0.57
Promedio 2 - 7 % 0.35 0.38 0.41 0.44 0.48 0.51 0.60
Pendiente Superior a 7 % 0.39 0.42 0.44 0.48 0.51 0.54 0.61
Pastizales
Plano 0 - 2 % 0.25 0.28 0.30 0.34 0.37 0.41 0.53
Promedio 2 - 7 % 0.33 0.36 0.38 0.42 0.45 0.49 0.58
Pendiente Superior a 7 % 0.37 0.40 0.42 0.46 0.49 0.43 0.60
Bosques
Plano 0 - 2 % 0.22 0.25 0.28 0.31 0.35 0.39 0.48
Promedio 2 - 7 % 0.31 0.34 0.36 0.40 0.43 0.47 0.56
Pendiente Superior a 7 % 0.35 0.39 0.41 0.45 0.48 0.52 0.58

PARA EL TIEMPO DE CONCENTRACIÓN TC:

Utilizamos la fórmula de Kirpich y la formula California Culvert Practice de las cuales se obtiene el
valor del tiempo de concentración mediante el promedio de ambos resultados.

 Formula de Kirpich:

Donde:

Tc: Tiempo de concentración (min).

L: Longitud del cauce principal de la cuenca (m).

S: Pendiente del cauce principal de la cuenca (m/m).

13
GOBIERNO REGIONAL DEL CUSCO
PROYECTO ESPECIAL REGIONAL PLAN COPESCO
OFICIONA DE PLANIFICACION Y PRESUPUESTO – COORDINACION DE ESTUDIOS DE PRE INVERSION

 Formula California Culvert Practice:

Donde:

Tc: Tiempo de Concentración (min)

L: Longitud del cauce principal en (m).

H: Desnivel máximo del cauce principal (m).

14
2.4 TABLA DE RESULTADOS:
DATOS
K 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584 83.3584
m 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308 0.136308
n 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001 0.54001
und cuenca - 01 cuenca - 02 cuenca - 03 cuenca - 04 cuenca - 05 cuenca - 06 cuenca - 07 Miskipujio Chillcahuaycco cuenca - 10 cuenca - 11 cuenca - 12 cuenca - 13 cuenca - 14 cuenca - 15 Ramuschaca cuenca - 17
m2 484,456.34 190,863.84 606,194.06 384,626.53 483,111.88 174,200.73 385,022.41 1,448,157.25 341,963.38 403,961.66 1,201,819.75 948,519.25 2,558,341.75 1,286,608.50 540,385.81 5,179,652.00 4,836,779.50
Área km2 0.48 0.19 0.61 0.38 0.48 0.17 0.39 1.45 0.34 0.40 1.20 0.95 2.56 1.29 0.54 5.18 4.84
ha 48.45 19.09 60.62 38.46 48.31 17.42 38.50 144.82 34.20 40.40 120.18 94.85 255.83 128.66 54.04 517.97 483.68
Longitud del cauce principal m 1,732.66 1,024.79 1,582.57 1,182.08 1,579.90 602.20 1,126.85 2,281.28 945.42 1,462.75 2,630.15 2,615.69 3,569.78 2,662.26 1,495.03 5,004.21 4,527.62
Altura máxima m.s.n.m 3,800.00 3,643.00 4,020.00 3,861.00 3,885.00 3,613.00 3,740.00 4,304.00 3,946.00 4,270.00 4,355.00 4,345.00 4,488.00 4,425.00 3,828.00 4,488.00 4,412.00
Altura mínima m.s.n.m 3,344.00 3,330.00 3,335.00 3,331.00 3,332.00 3,336.00 3,356.00 3,368.00 3,375.00 3,382.00 3,388.00 3,390.00 3,400.00 3,410.00 3,398.00 3,403.00 3,341.00
Pendiente 0.26 0.31 0.43 0.45 0.35 0.46 0.34 0.41 0.60 0.61 0.37 0.37 0.30 0.38 0.29 0.22 0.24
Precipitación 24h mm 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30 54.30
Coeficiente de escorrentia 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
RESULTADOS
TIEMPO DE CONCENTRACION
Metodo Kirpich (A) min 10.148 6.395 7.814 6.158 8.469 3.628 6.596 10.571 4.623 6.457 12.304 12.285 16.733 12.247 8.754 24.743 22.153
Metodo California Culvert Practice (B) min 10.164 6.405 7.826 6.167 8.482 3.633 6.606 10.587 4.630 6.466 12.323 12.304 16.758 12.266 8.767 24.781 22.187
TIEMPO DE CONCENTRACION min 10.156 6.400 7.820 6.163 8.476 3.630 6.601 10.579 4.626 6.461 12.314 12.295 16.746 12.257 8.761 24.762 22.170
PROM (A,B) hr 0.169 0.107 0.130 0.103 0.141 0.061 0.110 0.176 0.077 0.108 0.205 0.205 0.279 0.204 0.146 0.413 0.369
INTENSIDAD MAXIMA
1 mm/hr 23.840 30.591 27.454 31.223 26.286 41.550 30.084 23.320 36.451 30.434 21.485 21.503 18.198 21.539 25.821 14.733 15.640
5 mm/hr 29.689 38.095 34.188 38.882 32.734 51.743 37.464 29.041 45.393 37.900 26.755 26.777 22.662 26.822 32.155 18.347 19.476
15 mm/hr 34.485 44.249 39.711 45.163 38.022 60.101 43.516 33.732 52.726 44.022 31.077 31.103 26.323 31.155 37.349 21.311 22.622
25 mm/hr 36.971 47.440 42.575 48.420 40.764 64.435 46.654 36.165 56.528 47.197 33.318 33.346 28.222 33.402 40.043 22.847 24.254
PREC.MAX/TC 30 mm/hr 37.902 48.634 43.646 49.638 41.790 66.057 47.828 37.075 57.950 48.384 34.156 34.185 28.932 34.242 41.050 23.422 24.864
35 mm/hr 38.707 49.666 44.573 50.692 42.677 67.460 48.843 37.862 59.181 49.412 34.882 34.911 29.546 34.969 41.922 23.920 25.392
71 mm/hr 42.624 54.693 49.084 55.823 46.997 74.288 53.787 41.694 65.171 54.413 38.412 38.445 32.537 38.509 46.165 26.341 27.962
140 mm/hr 46.757 59.997 53.844 61.236 51.554 81.491 59.003 45.737 71.490 59.689 42.137 42.172 35.692 42.243 50.641 28.895 30.673
500 mm/hr 55.617 71.365 64.046 72.839 61.322 96.932 70.182 54.403 85.036 70.999 50.121 50.163 42.454 50.247 60.237 34.370 36.485
CAUDAL MAXIMO
1 m3/seg 1.476 1.894 1.699 1.933 1.627 2.572 1.862 1.444 2.256 1.884 1.330 1.331 1.127 1.333 1.598 0.912 0.968
5 m3/seg 1.838 2.358 2.116 2.407 2.026 3.203 2.319 1.798 2.810 2.346 1.656 1.658 1.403 1.660 1.990 1.136 1.206
15 m3/seg 2.135 2.739 2.458 2.796 2.354 3.720 2.694 2.088 3.264 2.725 1.924 1.925 1.629 1.929 2.312 1.319 1.400
25 m3/seg 2.289 2.937 2.635 2.997 2.523 3.989 2.888 2.239 3.499 2.922 2.062 2.064 1.747 2.068 2.479 1.414 1.501
Q= (C.I.A)/360 30 m3/seg 2.346 3.011 2.702 3.073 2.587 4.089 2.961 2.295 3.587 2.995 2.114 2.116 1.791 2.120 2.541 1.450 1.539
35 m3/seg 2.396 3.074 2.759 3.138 2.642 4.176 3.024 2.344 3.663 3.059 2.159 2.161 1.829 2.165 2.595 1.481 1.572
71 m3/seg 2.639 3.386 3.038 3.456 2.909 4.599 3.330 2.581 4.034 3.368 2.378 2.380 2.014 2.384 2.858 1.631 1.731
140 m3/seg 2.894 3.714 3.333 3.791 3.191 5.045 3.652 2.831 4.425 3.695 2.608 2.611 2.209 2.615 3.135 1.789 1.899
500 m3/seg 3.443 4.418 3.965 4.509 3.796 6.000 4.344 3.368 5.264 4.395 3.103 3.105 2.628 3.110 3.729 2.128 2.259

15
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

3 DRENAJE VIAL

Objetivo

El objetivo del estudio hidrológico e hidráulico para el proyecto: “MEJORAMIENTO DE LOS


SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN LA VIA VECINAL CU 902 -
TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE ANTA, REGION CUSCO” es
determinar la ubicación y diseño de las obras de drenaje necesarias para proteger la carretera
contra efectos nocivos que ocasiona el escurrimiento superficial resultado de las precipitaciones
pluviales, con este fin se realizó el análisis de caudales máximos para periodos de retorno
correspondientes a obras de drenaje según el manual de carreteras Hidrología, hidráulica y
Drenaje del Ministerio de Transportes y Comunicaciones. Se considera implementar estructuras de
drenaje que permitan la recepción, conducción y descarga hacia zonas donde no afecten la
estabilidad de la plataforma de la vía, tanto para el pavimento flexible como para el articulado.

3.1 DRENAJE TRANSVERSAL

El drenaje transversal está constituido por:

3.1.1 ALCANTARILLAS
La función principal de una alcantarilla es evacuar el flujo superficial proveniente de cursos de
agua, naturales o artificiales que interceptan la carretera.
El número y diámetro de las alcantarillas existentes es ineficiente. El funcionamiento de estas
estructuras en la actualidad es insuficiente por lo cual se propone un planteamiento de nuevas
estructuras apropiadas de acuerdo a las solicitaciones. La ubicación óptima de las alcantarillas
depende de su alineamiento y pendiente.

DISEÑO HIDRÁULICO

Para el cálculo hidráulico, se utilizó la teoría establecida para flujo en canales abiertos y tuberías
deducidas por Robert Manning expresada matemáticamente mediante la siguiente expresión:

Donde:
Q= Caudal (m3/seg)
A= Área de la sección hidráulica (m2)
P= Perímetro mojado
R= Radio hidráulico (m)

16
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

S= Pendiente (m/m)
n= coeficiente de rugosidad.

Los elementos geométricos se obtienen directamente de campo, incluyendo la pendiente


longitudinal del cauce, los valores del coeficiente de rugosidad y de la velocidad erosiva, se de-
terminaron de acuerdo a valores deducidos en laboratorios, para el caso de la rugosidad se
utilizaron las siguientes tablas:

17
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

Valores del Coeficiente de Rugosidad de Manning (n)

18
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

Fuente: Hidráulica de Canales Abiertos, Ven Te Chow, 1983.

También se debe tener en cuenta la velocidad, a continuación, se presenta una tabla con valores
máximos admisibles de velocidades de flujo según el tipo de material donde se des- plaza.

Fuente: HCANALES, Máximo Villon B.

Es importante verificar que la velocidad mínima del flujo dentro del conducto no produzca
sedimentación, pues esta podría ocasionar una reducción de su capacidad hidráulica, lo
recomendable es que la velocidad mínima sea 0.25 m/s.

19
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

3.1.2 TABLA DE RESULTADOS

AREA
ALCANTARILLA PROGRESIVA Q TIPO n PENDIENTE DIAMETRO TIRANTE EFICIENCIA
HIDRAULICA
m3/seg m/m m pulg m m2
ALC-1 0+000 1.198 TMC 0.026 0.02 0.90 36" 0.691 76.73% 0.524
ALC-2 0+235 1.198 TMC 0.026 0.02 0.90 36" 0.691 76.73% 0.524
ALC-3 0+415 1.537 TMC 0.026 0.02 1.20 48" 0.640 53.37% 0.614
ALC-4 0+773 1.537 TMC 0.026 0.02 1.20 48" 0.640 53.37% 0.614
ALC-5 0+907 2.759 TMC 0.026 0.02 1.50 60" 0.796 53.04% 0.952
ALC-6 1+207 3.138 TMC 0.026 0.02 1.50 60" 0.862 57.44% 1.050
ALC-7 1+394 1.849 TMC 0.026 0.02 1.20 48" 0.719 59.93% 0.708
ALC-8 1+561 0.793 TMC 0.026 0.02 0.90 36" 0.513 56.96% 0.374
ALC-9 1+950 1.253 TMC 0.026 0.02 0.90 36" 0.721 80.11% 0.546
ALC-10 1+996 2.923 TMC 0.026 0.02 1.50 60" 0.824 54.95% 0.995
ALC-11 2+653 3.024 TMC 0.026 0.02 1.50 60" 0.842 56.12% 1.021
ALC-12 2+922 2.344 TMC 0.026 0.02 1.20 48" 0.850 70.84% 0.857
ALC-13 3+283 3.663 TMC 0.026 0.02 1.50 60" 0.954 63.59% 1.186
ALC-14 3+767 3.059 TMC 0.026 0.02 1.50 60" 0.848 56.52% 1.030
ALC-15 3+855 2.159 TMC 0.026 0.02 1.20 48" 0.800 66.63% 0.800
ALC-16 4+723 1.297 TMC 0.026 0.02 1.20 48" 0.579 48.25% 0.540
ALC-17 4+860 0.432 TMC 0.026 0.02 0.90 36" 0.360 40.03% 0.238
ALC-18 4+961 0.432 TMC 0.026 0.02 0.90 36" 0.360 40.03% 0.238
ALC-19 5+107 0.183 TMC 0.026 0.02 0.90 36" 0.230 25.54% 0.128
ALC-20 5+140 0.183 TMC 0.026 0.02 0.90 36" 0.230 25.54% 0.128
ALC-21 5+250 0.366 TMC 0.026 0.02 0.90 36" 0.329 36.60% 0.211
ALC-22 5+355 1.097 TMC 0.026 0.02 0.90 36" 0.642 71.28% 0.485
ALC-23 5+511 0.433 TMC 0.026 0.02 0.90 36" 0.361 40.08% 0.238
ALC-24 5+677 1.299 TMC 0.026 0.02 1.20 48" 0.580 48.29% 0.541
ALC-25 5+980 0.692 TMC 0.026 0.02 0.90 36" 0.471 52.38% 0.337
ALC-26 6+273 0.519 TMC 0.026 0.02 0.90 36" 0.399 44.32% 0.272
ALC-27 6+649 1.817 TMC 0.026 0.02 1.20 48" 0.711 59.26% 0.698
Los datos anteriores fueron hallados con el programa HCanales; a continuación se muestran la
comprobación de datos.

20
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

21
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

22
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

23
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

24
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

25
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

26
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

27
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

28
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

29
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

30
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

31
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

32
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

33
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

3.2 DRENAJE LONGITUDINAL

34
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

El agua que fluye a lo largo de la superficie de la plataforma, tanto de la propia carretera como de
lo aportado por los taludes superiores adyacentes, debe ser encauzada y evacuada de tal forma
que no se produzcan daños a la carretera ni afecte su transitabilidad.

3.2.1 CUNETAS
Las cunetas son zanjas longitudinales ubicadas en ambos lados o a un solo lado de la carretera,
con el objeto de captar, conducir y evacuar adecuadamente los flujos del agua superficial.

El drenaje longitudinal está constituido por las cunetas de pie de talud. El caudal se estimó
utilizando el Método Racional para determinar el caudal de ingreso.

El área contribuyente considera un ancho de 40 m, de esta forma determinamos el total de área de


las intercuencas aportantes a las cunetas y la intensidad de lluvia máxima en un periodo de 35
años (67.46 mm/hr).

Velocidades máximas:

Para que no produzcan erosión en las paredes y fondo del canal, valores que sobrepasan las
velocidades máximas permisibles, modifican las rasantes y crean dificultades al funcionamiento de
las estructuras que tenga el canal. Las velocidades máximas recomendadas, en función del
material del canal, son:

Fuente: Manual de diseño de carreteras pavimentadas de bajo volumen de tránsito (MTC, 2000)

DISEÑO DE CUNETAS

Para el drenaje del escurrimiento superficial que se presenta en la superficie asfaltada y zona
adyacente a la carretera, se ha considerado la implementación de cunetas triangulares revestidas
de concreto simple de dimensiones mínimas de a= 0.75 m de ancho y b=0.30m de profundidad.
Conforme a las dimensiones mínimas de cunetas del manual de hidrología y drenaje del MTC

35
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

Para el diseño hidráulico de las cunetas utilizaremos el principio del flujo en canales abiertos,
usando la ecuación de Manning:

Donde;

Q= Caudal (m³/s)
A= Área de la sección hidráulica (m²)
P= Perímetro mojado (m)
R= Radio hidráulico (m)
S= Pendiente (m/m)
n= Coeficiente de rugosidad

En este proyecto se consideró 02 tipos de cunetas, tipo triangular y rectangular, la ubicación del
tipo de cunetas por progresivas se puede apreciar en los cuadros siguientes, así mismo, los
detalles de sus dimensiones se apreciar en las siguientes imágenes.

36
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

37
Lado Máx. Capacidad Area Caudal de Verificació
Estructura Distancia Cuneta
Progresivas S (%) S (m/m) V (m/s) Hidráulica de Aportante Escorrentia (m3/s) Velocidad
Proyectada Derecha Centro (m) Tipo
Cuneta (m3/s) Km2 (< 6m/s)
0 - 223  223.05 0.26 0.0026 0.82 0.11 triangular 0.00892 0.0769 CUMPLE C
ALC-1 - ALC-2 0+000 - 0+235
223 - 235  11.95 2.60 0.0260 2.59 0.36 triangular 0.00048 0.0041 CUMPLE C
ALC-2 - ALC-3 0+235 - 0+415 235 - 415  180.00 2.60 0.0260 2.59 0.36 triangular 0.00720 0.0621 CUMPLE C
415 - 465  50.19 2.60 0.0260 2.59 0.36 triangular 0.00201 0.0173 CUMPLE C
ALC-3 - ALC-4 0+415 - 0+773 465 - 622  156.94 4.80 0.0480 3.51 0.49 triangular 0.00628 0.0541 CUMPLE C
622 - 773  150.87 3.08 0.0308 2.81 0.39 triangular 0.00603 0.0520 CUMPLE C
773 - 792  19.42 3.08 0.0308 2.81 0.39 triangular 0.00078 0.0067 CUMPLE C
ALC-4 - ALC-5 0+773 - 0+907
792 - 907  114.74 0.87 0.0087 1.50 0.21 triangular 0.00459 0.0396 CUMPLE C
907 - 986  78.85 3.76 0.0376 3.11 0.44 triangular 0.00315 0.0272 CUMPLE C
ALC-5 - ALC-6 0+907 - 1+207 986 - 1104  117.53 2.12 0.0212 2.34 0.33 triangular 0.00470 0.0405 CUMPLE C
1104 - 1207  103.88 0.27 0.0027 0.83 0.12 triangular 0.00416 0.0358 CUMPLE C
1207 - 1338  130.72 1.78 0.0178 2.14 0.30 triangular 0.00523 0.0451 CUMPLE C
ALC-6 - ALC-7 1+207 - 1+394
1338 - 1394  55.86 0.63 0.0063 1.27 0.18 triangular 0.00223 0.0193 CUMPLE C
ALC-7 - ALC-8 1+394 - 1+561 1394 - 1561  167.18 0.63 0.0063 1.27 0.18 triangular 0.00669 0.0576 CUMPLE C
1561 - 1688  126.88 3.16 0.0316 2.85 0.40 triangular 0.00508 0.0437 CUMPLE C
ALC-8 - ALC-9 1+561 - 1+950 1688 - 1818  129.85 0.26 0.0026 0.82 0.11 triangular 0.00519 0.0448 CUMPLE C
1818 - 1950  132.09 2.64 0.0264 2.61 0.36 triangular 0.00528 0.0455 CUMPLE C
ALC-9 - ALC-10 1+950 - 1+996 1950 1996  46.00 2.64 0.0264 2.62 0.36 triangular 0.00184 0.0159 CUMPLE C
1996 - 2099  102.67 5.13 0.0513 3.65 0.50 rectangular 0.00411 0.0354 CUMPLE C
2099 - 2201  102.58 1.07 0.0107 1.67 0.23 rectangular 0.00410 0.0354 CUMPLE C
ALC-10 - ALC-11 1+996 - 2+653 2201 - 2278  76.94 11.30 0.1130 5.42 0.74 rectangular 0.00308 0.0265 CUMPLE C
2278 - 2463  185.25 4.99 0.0499 3.60 0.49 rectangular 0.00741 0.0639 CUMPLE C
2463 - 2653  189.56 4.10 0.0410 3.27 0.45 rectangular 0.00758 0.0654 CUMPLE C
2653 - 2723  70.35 4.10 0.0410 3.27 0.45 rectangular 0.00281 0.0243 CUMPLE C
ALC-11 - ALC-12 2+653 - 2+922
2723 - 2922  199.01 0.14 0.0014 0.60 0.08 rectangular 0.00796 0.0686 CUMPLE C
2922 - 3099  177.03 6.09 0.0609 3.98 0.55 rectangular 0.00708 0.0610 CUMPLE C
ALC-12 - ALC-13 2+922 - 3+283
3099 - 3283  184.03 0.50 0.0050 1.14 0.16 rectangular 0.00736 0.0635 CUMPLE C
3283 - 3448  164.87 5.41 0.0541 3.75 0.51 rectangular 0.00659 0.0568 CUMPLE C
3448 - 3547  98.75 1.35 0.0135 1.87 0.26 rectangular 0.00395 0.0340 CUMPLE C
ALC-13 - ALC-14 3+283 - 3+767
3547 - 3652  104.84 3.74 0.0374 3.12 0.43 rectangular 0.00419 0.0361 CUMPLE C
3652 - 3767  115.60 1.07 0.0107 1.67 0.23 rectangular 0.00462 0.0399 CUMPLE C
ALC-14 - ALC-15 3+767 - 3+855 3767 - 3855  87.52 4.06 0.0406 3.25 0.45 rectangular 0.00350 0.0302 CUMPLE C
3855 - 3910  54.86 4.06 0.0406 3.25 0.45 rectangular 0.00219 0.0189 CUMPLE C
3910 - 4061  150.80 1.02 0.0102 1.63 0.22 rectangular 0.00603 0.0520 CUMPLE C
ALC-15 - ALC-16 3+855 - 4+723
4061 - 4440  379.75 1.17 0.0117 1.74 0.24 rectangular 0.01519 0.1309 CUMPLE C
4440 - 4724  283.48 0.68 0.0068 1.33 0.18 rectangular 0.01134 0.0977 CUMPLE C
ALC-16 - ALC-17 4+723 - 4+860 4724 - 4860  136.11 1.55 0.0155 2.01 0.28 rectangular 0.00544 0.0469 CUMPLE C
ALC-17 - ALC-18 4+860 - 4+961 4860 - 4962  101.67 1.55 0.0155 2.01 0.28 rectangular 0.00407 0.0351 CUMPLE C
ALC-18 - ALC-19 4+961 - 5+107 4962 - 5107  145.33 2.93 0.0293 2.76 0.38 rectangular 0.00581 0.0501 CUMPLE C
ALC-19 - ALC-20 5+107 - 5+140 5107 - 5140  33.00 2.93 0.0293 2.76 0.38 rectangular 0.00132 0.0114 CUMPLE C
ALC-20 - ALC-21 5+140 - 5+250 5140 5250  110.00 2.93 0.0293 2.75 0.38 triangular 0.00440 0.0379 CUMPLE C
5250 - 5312  62.01 2.93 0.0293 2.75 0.38 triangular 0.00248 0.0214 CUMPLE C
ALC-21 - ALC-22 5+250 - 5+355
5312 - 5355  42.99 0.43 0.0043 1.05 0.15 triangular 0.00172 0.0148 CUMPLE C
ALC-22 - ALC-23 5+355 - 5+511 5355 - 5511  156.04 0.43 0.0043 1.05 0.15 triangular 0.00624 0.0538 CUMPLE C
ALC-23 - ALC-24 5+511 - 5+677 5511 - 5678  166.46 2.04 0.0204 2.29 0.32 triangular 0.00666 0.0574 CUMPLE C
ALC-24 - ALC-25 5+677 - 5+980 5678 - 5980  302.50 3.19 0.0319 2.86 0.40 triangular 0.01210 0.1043 CUMPLE C
5980 - 6001  20.79 3.19 0.0319 2.86 0.40 triangular 0.00083 0.0072 CUMPLE C
ALC-25 - ALC-26 5+980 - 6+273
6001 - 6273  272.51 5.35 0.0535 3.71 0.52 triangular 0.01090 0.0940 CUMPLE C
6273 - 6453  180.17 0.52 0.0052 1.16 0.16 triangular 0.00721 0.0621 CUMPLE C
ALC-26 - ALC-27 6+273 - 6+649
6453 - 6650  196.43 2.73 0.0273 2.65 0.37 triangular 0.00786 0.0677 CUMPLE C

38
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

Los valores fueron verificados con en los programas Hcanales y cunetaenlinea.php.

39
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

4 CONCLUSIONES
 Con los caudales obtenidos se procedió a hacer las verificaciones hidráulicas para
el dimensionamiento de las alcantarillas, resultando 13 alcantarillas tipo TMC de 36”, 08
alcantarillas tipo TMC de 48” y 06 alcantarillas tipo TMC de 60” teniendo un total de 27
alcantarillas, como se muestra en la siguiente tabla:

ITEM ALCANTARILLA PROGRESIVA DIAMETRO


SENTIDO
1 ALC-1 0+000 0.90 36" Derecha-Izquierda
2 ALC-2 0+235 0.90 36" Derecha-Izquierda
3 ALC-3 0+415 1.20 48" Derecha-Izquierda
4 ALC-4 0+773 1.20 48" Derecha-Izquierda
5 ALC-5 0+907 1.50 60" Derecha-Izquierda
6 ALC-6 1+207 1.50 60" Derecha-Izquierda
7 ALC-7 1+394 1.20 48" Derecha-Izquierda
8 ALC-8 1+561 0.90 36" Derecha-Izquierda
9 ALC-9 1+950 0.90 36" Derecha-Izquierda
10 ALC-10 1+996 1.50 60" Derecha-Izquierda
11 ALC-11 2+653 1.50 60" Derecha-Izquierda
12 ALC-12 2+922 1.20 48" Derecha-Izquierda
13 ALC-13 3+283 1.50 60" Derecha-Izquierda
14 ALC-14 3+767 1.50 60" Derecha-Izquierda
15 ALC-15 3+855 1.20 48" Derecha-Izquierda
16 ALC-16 4+723 1.20 48" Derecha-Izquierda
17 ALC-17 4+860 0.90 36" Derecha-Izquierda
18 ALC-18 4+961 0.90 36" Derecha-Izquierda
19 ALC-19 5+107 0.90 36" Derecha-Izquierda
20 ALC-20 5+140 0.90 36" Derecha-Izquierda
21 ALC-21 5+250 0.90 36" Derecha-Izquierda
22 ALC-22 5+355 0.90 36" Derecha-Izquierda
23 ALC-23 5+511 0.90 36" Derecha-Izquierda
24 ALC-24 5+677 1.20 48" Derecha-Izquierda
25 ALC-25 5+980 0.90 36" Derecha-Izquierda
26 ALC-26 6+273 0.90 36" Derecha-Izquierda
27 ALC-27 6+649.897 1.20 48" Derecha-Izquierda

40
“MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VIAL INTERURBANA EN
LA VIA VECINAL CU 902 - TRAMOS CCPPs HUAROCONDO Y ZURITE, PROVINCIA DE
ANTA, REGION CUSCO” CU Nº 2491244”

 Para el dimensionamiento de las cunetas se realizó su verificación según


velocidad y capacidad hidráulica según los caudales tributarios para cada tramo, se
plantearon 2 tipos; triangulares para el caso del pavimento flexible y rectangulares para el
tramo de pavimento articulado, los detalles se muestran en el siguiente cuadro:

ITEM PROGRESIVA TIPO


1 0+000 - 0+235 triangular
2 0+235 - 0+415 triangular
3 0+415 - 0+773 triangular
4 0+773 - 0+907 triangular
5 0+907 - 1+207 triangular
6 1+207 - 1+394 triangular
7 1+394 - 1+561 triangular
8 1+561 - 1+950 triangular
9 1+950 - 1+996 rectangular
10 1+996 - 2+653 rectangular
11 2+653 - 2+922 rectangular
12 2+922 - 3+283 rectangular
13 3+283 - 3+767 rectangular
14 3+767 - 3+855 rectangular
15 3+855 - 4+723 rectangular
16 4+723 - 4+860 rectangular
17 4+860 - 4+961 rectangular
18 4+961 - 5+107 rectangular
19 5+107 - 5+140 rectangular
20 5+140 - 5+250 triangular
21 5+250 - 5+355 triangular
22 5+355 - 5+511 triangular
23 5+511 - 5+677 triangular
24 5+677 - 5+980 triangular
25 5+980 - 6+273 triangular
26 6+273 - 6+649 triangular

5 RECOMENDACIONES
 Debe darse fiel cumplimiento a las especificaciones técnicas referente a la
construcción de obras de drenaje y al cumplimiento de las Normas Ambientales del
MTC
 Según el MINAM, 2010, las mayores precipitaciones ocurren durante los meses de
diciembre a marzo, siendo los meses de octubre, noviembre y abril meses de
transición. La época seca corresponde al resto del año. Por lo que se recomienda
realizar el proceso constructivo durante los meses de estiaje.