Clase 2
Clase 2
https://www.youtube.com/watch?v=BDbifP4VhaE
Datos:.
• LWT: 45 F
• GPM: 20.8
• CFM: 2500 CFM
• TTL MBH: 55500 Btu/h
• Qs : 46000 Btu/h
• LAT Db: 57.9 F
• LAT Wb: 55.5 F
• LAh : 23.52 Btu/lb
• EAh : 28.49 Btu/lb
85/75 F
54/53 F
72/60 F
Caudales a comparar: Carga termica versus Renovaciones/hora.
Problema: cada vez mas aire en flujo laminar (cortinas de aire).
Q equipo = 4,5 x 1270 x (38.52‐22.01) = 94355 Btu/h = 7.8 tons
Caudal CFM/ton = 1270/7.8 = 163 CFM
85/75 F
54/53 F
72/60 F
Distribucion deAire
Flujo Cruzado
Contraflujo
Tiro inducido
Tiro forzado
Tipos de Torres de Enfriamiento Abiertas ‐ Esquemas
Tipos de Torres de Enfriamiento Abiertas ‐ Esquemas
Tipos de Torres de Enfriamiento Cerradas ‐ Esquemas
Tipos de Torres de Enfriamiento Cerradas ‐ Esquemas
Como funciona una Torre deenfriamiento?
Porque enfriado por agua?
Chiller con condensador enfriado poragua
155
156
157
1. Casing (estructura)
2. Paneles laterals
3. Transmisión
4. Ventilador
5. Bandejas de agua
caliente
6. Relleno (Fill)
7. Persianas de tomade
aire (louvers)
8. Bandeja de agua
Air Inlet
Water Outlet
https://www.youtube.com/watch?v=fEpSHtj8bkM
Partes de una torre deenfriamiento
Sistema de AC con Agua Helada con Condensacion por Agua
Distribucion de agua (bandejas de agua caliente)
Relleno
Relleno
Relleno
Enfriamiento Evaporativo en una T.E. ‐Real
Psicrómetro
Aproximacion no menor a 5 F
TORRE DE ENFRIAMIENTO
Parametros
TE GPM
TEWB TEWB
Air Air
TL
TERMINOS
APPROACH = TL - TEWB
RANGO = TE - TL
173
Rango yAproximación
WBT aire
Comportamiento 1
Comportamiento 2
Grafica para
seleccionar
Datos deSelección
1. Caudal de agua(GPM)
2. Temperatura de entrada de agua (EWT)
3. Temperatura de salida de agua (LWT) o T.
4. Temperatura de bulbo húmedo del aire (WBT)
Uso deSoftware
Certificacion de Performance
Certificacion de Performance
Torre de Enfriamiento Cerradas ‐ Explicacion
Torre de Enfriamiento – Catalogo capacidad
Tres Fuentes
Evaporación‐ Función de lacarga
térmica
“Lo Que El Viento SeLlevó”‐
Despreciable
Purga‐ Depende dela calidad del Agua
Una formula mágica
C=(E+D+B)/(D+B)
MAKE-UP WATER
FACT:
The make up water requirement is determined
by the water treatment especialist based on the
composition of the water available at site to
determine the “cycles of concentration” which
will provide for a safe operation of the chiller.
186
CYCLES OF CONCENTRATION
Compares the concentration of solids in the
tower recirculating water to the concentration
in the make up water.
Example: Four cycles of concentration means
that the concentration of solids in the cooling
tower water is four times higher than the
concentration of solids in the make up water.
The water treatment specialist will determine
the value best suited for the job based on what
is dissolved in the available water supply.
187
Tabla De Calidad De Agua De Fabricantes
CYCLES OF CONCENTRATION(XT/XM)
Mass balance: Water in = Water out: M = E + P + W (1)
Solids in = Solids out: M.XM = P.XT + W.XT (2)
W E XM = Concentr. in make-up water
COND. XT = Concentr. in tower water
COOLING XT M
TOWER
(2) =
P +W
; P+W=M
XM XT
XM
M XT E+P+W E
XM = P + W = P + W+ 1
XT E
-1 = E =
XM P +W M
E = Evaporation XT
M = Make-up P XM
P = Purge XT E
M=
W = Windage XM XT
- 1
XM
189
COOLING TOWER WATERCONSUMPTION
MAKE-UP (% OF EVAPORATION)
200
180
160
140
120
100
2 3 4 5 6 7
CYCLES OF CONCENTRATION
190
EXAMPLE
Assume the cycles of concentration determined
for a site is 4. Determine the amount of cooling
tower make up water.
From the formula:
M=4 E = 1.33 x E
4-1
Make-up water = Tower evaporation rate + 33%
191
Desmitificación del
85°F/95°
COOLING TOWER CAPACITY CONTROL
The capacity of a tower can be controlled varying
the air or water flow or both.
Water flow control is very rarely used because of
the problems it may cause with the performance
of the refrigeration equipment (fouling) and the
tower itself (water distribution and fouling). If done,
it should be done only after a careful analysis.
Air flow control is probably a more common form
of capacity control but should only be applied after
consultation with the tower and VFD manufacturer.
Although air flow reduction may save fan power, it
may not be sufficient to offset the increased power
consumption of the refrigeration equipment.
194
COOLING TOWER CAPACITY CONTROL
ASHRAE 90.1-2007 calls for fan motors ≥ 7½Hp
of heat rejection equipment to have fan speed
control with some exceptions:
195
CHILLER ENFRIADO POR AGUA
1.04 1.20
Cooler: 54°F/44°F – Elevation: 3,000’
CAPACITY RATIO
KW/TON RATIO
1.02 1.10
1.00 1.00
0.98 0.90
0.96 0.80
75 80 85 90 95
Entering Condenser Water Temperature. (°F)
196
Tratamiento deagua
(Peor Competencia De Los
Sistemas de Enfriamiento Evaporativos)
Sólidos suspendidos
Sólidos disueltos
Resistencia térmica – Incrustaciones
Material biológico
Legionela
Más resistencia térmica del material biológico, otro
problema!
Corrosión
Tratamiento delAgua
“Talón deAquiles”
• Problema – Sólidos
Suspendidos
• Solución – Filtración
Mecánica
Tratamiento del Agua, “Talónde
– Problema‐ Sólidos Disueltos
Aquiles”
• Incrustación
• – Aumento Extraordinario En La ResistenciaTérmica
– Solución‐ Tratamiento Químicoo Electrónico
¿Por qué necesitamos controlar las Bacteriasen
un Sistemade Enfriamientode Agua?