Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Matricula:
100619797
Materia:
Administración Financiera
Sección:
01
Maestro:
SOLUCIÓN DE EJERCICIOS
PROBLEMAS
Problemas básicos
Ventas 300,000
Utilidad (pérdida) 0
neta
IT – CT = 0
(PV x PE) – (CFT + (CV x PE)) = 0
(13 x 4,000) – (20,000 + (8x 4,000) = 0
(52,000) – (20,000 + ,32.000 ) = 0
$52,000 - $52,000 = 0
𝑸 = 𝑪𝑭𝑻 + 𝑼 /𝑴𝑪
Q= 20,000 + 15,000= 35,000 / 5 = 7,000
Q= 7,000 unidades
Confirmacion:
Confirmación
IT – CT = 0
(PV x PE) – (CFT + (CV x PE)) = 0
(8 x 40,000) – (232,000 + (2.20 x40, 000) = 0
(320,000) – (232,000 + 88.000 ) = 0
$320,000 - $320,000 = 0
5. Eaton Tool Company tiene costos fijos por 200 000 dólares, vende sus
unidades en 56 dólares y tiene costos variables de 31 dólares por unidad.
Confirmación
IT – CT = 0
(PV x PE) – (CFT + (CV x PE)) = 0
(56x 8,000) – (200,000 + (31 x 8,000) = 0
(448,000) – (200,000 + ,248,000 ) = 0
$448,000 - $448,000 = 0
b) La señora Eaton propone un nuevo plan para reducir los costos fijos a
150 000 dólares.
Sin embargo, requeriría más mano de obra, lo cual aumentaría los costos
variables por unidad a 34 dólares. El precio de venta permanecería en 56
dólares. ¿Cuál es el nuevo punto de equilibrio?
IT – CT = 0
(PV x PE) – (CFT + (CV x PE)) = 0
(56x 6,818.18182) – (150,000 + (34 x 6818.18182) = 0
(381,818.08) – (150,000 +231,818.182) = 0
$ 381,818.182-$381,818.182= 0
c) Con el nuevo plan, ¿qué pasaría con la rentabilidad dado que se producirán
volúmenes muy altos (en comparación con el plan antiguo)?
Confirmación
IT – CT = 0
(PV x PE) – (CFT + (CV x PE)) = 0
(4 x 50,000) – (70,000 + (2.60 x 50,000) = 0
(200,000) – (70,000 + 130,000 ) = 0
$200,000 - $200,000 = 0
Confirmación
IT – CT = 0
(PV x PE) – (CFT + (CV x PE)) = 0
(4 x60,000) – (105,000 + (2.25 x60,000) = 0
(60,000) – (105,000 +135,000 ) = 0
$240,000 - $240,000 = 0
PE= CFT/MC
Confirmacion:
IT - CT = 0
444,444 – 444,444 = 0
𝑹𝑴𝑪 = 𝑷𝑽 − 𝑪𝑽/𝑷𝑽
𝑷𝑬 = 𝑪𝑭𝑻 𝑹𝑴𝑪
PE= 444,444
Confirmacion:
IT - CT = 0
(PV x PE) – (CFT + CV x PE)) = 0
(50 x 68,000) – (2,040,000 + 20 x 68,000)) = 0
3,400,000 – (2,040,000 + 1,360,000) = 0
3,400,000 – 3,400,000 = 0
𝑹𝑴𝑪 = 𝑷𝑽 − 𝑪𝑽/𝑷𝑽
RMC= 50 – 20 / 50 =0.6
𝑷𝑬 = 𝑪𝑭𝑻 𝑹𝑴𝑪
𝑃𝐸 = 2,040,000/ 0.6 = 3,400,000
PE= 3,400,000
PE= CFT/MC
PE= 4,500,000 / 4
= 1,125,000
Confirmacion:
IT - CT = 0
(PV x PE) – (CFT + CV x PE)) = 0
(6 x 1,125,000) – (4,500,000 + 2 x 1,125,000)) = 0
6,750,000 – (4,500,000 + 2,250,000) = 0
6,750,000 – 6,750,000 = 0
𝑹𝑴𝑪 = 𝑷𝑽 − 𝑪𝑽/𝑷𝑽
RMC= 6 – 2 / 6 = 0.66
𝑷𝑬 = 𝑪𝑭𝑻 𝑹𝑴𝑪
𝑃𝐸 = 4,500,000 /0.66 = 6,750,000
PE= 6,750,000
Problemas intermedios
𝑴𝑪 = 𝑷𝑽 − 𝑪𝑽
𝑀𝐶 = 60 − 30 = 30
GAO= 3 veces
GAF= 1.3
GAT= 4
PE= CFT / MC
PE= 400,000 / 60 - 30
PE= 400,000 / 30
PE= 13,333
GAO= 3
PE= CFT / MC
PE= 200,000 / 50 - 20
PE= 200,000 / 30
PE= 66,667
PE= CFT / MC
PE= 80,000 / 15 - 10
PE= 80,000 / 5
GAO= 5
GAF=2
GAT= 10
PE= CFT / MC
PE= 80,000 / 10 - (50 x 0.10)
PE= 80,000 / 5
PE= 16,000
GAO= 5
GAF= 2
GAT= 10
𝑴𝑪 = 𝑷𝑽 − 𝑪𝑽
𝑀𝐶 = 25 − 5 = 20
Empresa Sinclair:
𝑴𝑪 = 𝑷𝑽 − 𝑪𝑽
𝑀𝐶 = 20 − 16 = 4
Deudas= 600,000
𝑀𝐶 = 20 − 10 = 10
GAC= C x MC / (C x MC) – CF – I