1 ATERRAMIENTO DE BANDEJAS
2 BANDEJAS
3 POSTES
6 GABINETES
11 SISTEMA DE TELEFONÍA
21 SISTEMA DE TELEPRESENCIA
IMPRESORAS
S/. $
CONDUCTORES ELECTRICOS
1,200.00 NO
DE LIMA SA
10,000.00 NO SINOHYDRO
132,462.55 SI SIMPLIFY
700,685.50 SI SINOHYDRO
56,062.09 NO SIMPLIFY
62,492.28 SI SIMPLIFY
12,224.82 NO SIMPLIFY
95,208.19 NO SIMPLIFY
13,534.51 NO SIMPLIFY
176,714.07 NO SIMPLIFY
69,737.66 NO SIMPLIFY
150,189.04 NO SIMPLIFY
37,675.42 NO SIMPLIFY
106,109.86 SI SECURITECH
929,221.00 SI SIVSA
136,187.97 SI SIMPLIFY
BEIJING KAITONG
248,000.00 SI TECHNOLOGY DEVELOPMENT
CO., LTD.
POR DEFINIR
ADELANTO OTORGADO SALDO DEL TOTAL
SALDO DEL ADELANTO O POR
ADELANTAR
S/. $ S/.
3,000.00
1,288.56
73,360.30 59,102.25
455,632.06 245,053.44
53,840.89 2,221.20
3,816.47 58,675.81
7,600.00 0.00
50,000.00 45,208.19
0.00 13,534.51
45,000.00 267,003.55
30,000.00 216,286.30
193,000.00 32,236.31
70,000.00 65,094.97
22,800.00 242,477.06
11,400.00 168,494.30
138,253.41 0.00
176,714.07 0.00
40,576.15 29,161.51
150,189.04
327,000.00 218,807.87
148,000.00 97,431.87
37,675.42
S/ 10,610.99 106,109.86
350,214.00 579,007.00
136,187.97
$124,000.00
TOTAL S/ 2,822,575.00
SALDO DEL TOTAL
TIEMPO ESTIMADO DE
CONDICIÓN ECONÓMICA PARA LA
LLEGADA DE MATERIALES /
ATENCIÓN
EQUIPOS A OBRA
$
EL PROVEEDOR VIENE
GESTIONANDO UN 2DO 60 DÍAS
FACTORING
$705,268.00
OBSERVACIÓN
SALDO PENDIENTE A SIMPLIFY. SOLO ESTÁ PENDIENTE QUE ENVIE A OBRA UN TV DE 50"
SALDO PENDIENTE A SECURITECH. SE DEBE REALIZAR EL PAGO DEL ADELANTO DEL 10%
PARA INICIAR LOS TRABAJOS