Documentos de Académico
Documentos de Profesional
Documentos de Cultura
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MANO DE OBRA
Nombre del recurso METRADO val 1 val 2 val 3
PRECIO
UNIDA TOTAL S/.
UNIT.S/. CANTIDAD METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
DES
OPERARIO hh 24.22 11304.46 273793.99 2322.18 56,243.20 3936.68 95,346.49 5045.59 122,204.30
OFICIAL hh 19.12 3467.26 66294.09 1529.38 29,241.69 1293.29 24,727.75 644.59 12,324.65
PEON hh 17.28 11676.49 201769.68 3463.12 59,842.71 4217.00 72,869.70 3996.37 69,057.27
OPERADOR DE EQUIPO LIVIANO hh 26.16 219.64 5745.85 134.38 3,515.45 79.94 2,091.32 5.32 139.08
TOPOGRAFO hh 26.4 10.15 267.95 8.60 226.96 1.55 40.99 0.00
PERSONAL DE LIMPIEZA Y DESINFECCION mes 1500 3.00 4500.00 1.06 1,585.23 1.02 1,534.09 0.92 1,380.68
552371.56 150655.24 196610.34 205105.98
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
ASFALTO RC-250 gal 10.59 69.22 732.93 37.65 398.71 21.58 228.53 9.98 105.69
ALAMBRE NEGRO RECOCIDO N° 8 kg 5.08 1.00 4254.60 416.07 2,113.63 374.94 1,904.72 46.51 236.25
ALAMBRE NEGRO N° 16 kg 5.08 1.00 6300.82 660.60 3,355.83 508.63 2,583.84 71.09 361.15
ANGULO DE HIERRO DE 1"X1"X1/8" m 6.78 1.00 1600.35 0.00 0.00 236.04 1,600.35
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 4.15 1.00 94638.59 11776.96 48,874.38 9114.61 37,825.62 1912.91 7,938.59
COBERTURA METALICA TIPO II SEGUN DISEÑO (INCLUYE INSTALACION) glb 33898.31 1.00 33898.32 0.50 16,949.16 0.50 16,949.16 0.00
COBERTURA METALICA TIPO I SEGUN DISEÑO (INCLUYE INSTALACION) glb 42372.88 964.58 42372.88 1.00 42,372.88 0.00 0.00
CLAVOS PARA MADERA CON CABEZA DE 2" kg 5.08 2386.54 1598.22 166.43 845.45 138.43 703.24 9.75 49.53
CLAVOS PARA MADERA CON CABEZA DE 3" kg 5.08 236.04 2993.64 286.69 1,456.36 256.17 1,301.33 46.45 235.95
ABRAZADERA DE FIERRO GALVANIZADO C/2 OREJAS 3/4" und 0.85 43247.79 17.54 0.00 0.00 20.64 17.54
ABRAZADERA DE FIERRO GALVANIZADO C/2 OREJAS 1 1/2" und 1.53 1.00 35.53 0.00 0.00 23.22 35.53
TUBERIA PVC-SAP ELECTRICA Ø=20 mm m 3.39 1.00 2686.00 264.44 896.46 527.89 1,789.54 0.00
TUBERIA PVC-SAP ELECTRICA Ø=25 mm m 3.98 393.68 208.19 27.51 109.49 24.80 98.7 0.00
TUBERIA PVC-SAP ELECTRICA Ø=40 mm m 5.93 696.34 1191.63 200.95 1,191.63 0.00 0.00
TUBERIA PVC-SAP C-10 S/P DE 1/2" X 5 m m 1.86 0.13 90.82 2.54 4.72 21.32 39.65 24.97 46.45
TUBERIA PVC-SAP C-10 S/P DE 2" X 5 m m 6.78 1.00 28.34 0.00 0.00 4.18 28.34
TUBERIA PVC-SAP C-10 S/P DE 3/4" X 5 m m 4.07 3.25 203.95 0.00 24.45 99.51 25.66 104.44
TUBERIA PVC-SAP C-10 S/P DE 1 1/2" X 5 m m 6.61 20.64 15.27 0.00 0.00 2.31 15.27
CODO PVC-SAP S/P 2" X 90° und 11.86 23.22 23.72 0.00 0.00 2.00 23.72
CODO PVC-SAP C/R 1/2" X 90° und 1.69 3.90 23.66 0.00 0.00 14.00 23.66
CODO PVC-SAP C/R 3/4" X 90° und 3.81 50.10 7.62 0.00 0.00 2.00 7.62
CODO PVC-SAP S/P 1 1/2" X 90° und 7.63 37.73 22.89 0.00 0.00 3.00 22.89
CODO PVC-SAP S/P 1/2" X 90° und 1.53 12.00 8.92 0.00 2.92 4.46 2.92 4.46
CODO PVC-SAP S/P 3/4" X 90° und 2.12 4.18 16.43 0.00 3.78 8.01 3.97 8.42
CODO PVC-SAL 4" X 90° und 7.63 2.31 92.78 0.00 10.16 77.52 2.00 15.26
TEE PVC-SAP S/P 1/2" und 1.69 7.74 10.87 0.00 1.72 2.9 4.72 7.97
TEE PVC-SAP S/P 1 1/2" und 11.86 3.00 11.86 0.00 0.00 1.00 11.86
TEE PVC-SAP S/P 3/4" und 2.80 2.00 12.77 0.00 2.23 6.23 2.34 6.54
TAPON MACHO PVC-SAP C/R 1/2" und 1.27 6.00 3.81 0.00 0.00 3.00 3.81
CURVA PVC-SAP ELECTRICA Ø=20 mm und 2.12 2.00 1204.67 156.47 331.71 411.77 872.96 0.00
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
CURVA PVC-SAP ELECTRICA Ø=25 mm und 4.24 6.00 78.65 6.55 27.77 12.00 50.88 0.00
CURVA PVC-SAP ELECTRICA Ø=40 mm und 6.78 2.00 324.42 47.85 324.42 0.00 0.00
ADAPTADOR PVC-SAP 1/2" und 1.02 5.83 8.16 0.00 0.00 8.00 8.16
ADAPTADOR PVC-SAP 3/4" und 1.95 5.00 3.90 0.00 0.00 2.00 3.9
ADAPTADOR PVC-SAP S/P 1 1/2" und 4.24 5.00 50.88 0.00 0.00 12.00 50.88
UNION UNIVERSAL PVC-SAP C/R 1/2" und 4.24 3.00 11.03 0.21 0.9 0.21 0.87 2.18 9.26
UNION UNIVERSAL PVC-SAP C/R 3/4" und 6.78 1.00 13.56 0.00 0.00 2.00 13.56
UNION UNIVERSAL PVC-SAP C/R 2" und 20.34 3.43 40.68 0.00 0.00 2.00 40.68
TUBERIA PVC-SAP DESAGUE DE 4" X 3 m m 16.95 4.56 239.33 14.12 239.33 0.00 0.00
TUBERIA PVC UF 200 mm-S25-ISO4435 m 31.36 568.23 934.53 0.00 29.80 934.53 0.00
TUBERIA PVC-SAL 4" X 3 m m 9.32 47.85 689.77 0.00 71.13 662.93 2.88 26.84
GRASS SINTETICO DECORATIVO e = 30 mm und 67.80 18.55 5261.96 0.00 77.61 5,261.96 0.00
UNION PVC-SAP 1 1/2" CON ROSCA und 7.63 8.00 7.63 0.00 0.00 1.00 7.63
UNION PVC-SAP ELECTRICA Ø=20 mm und 1.53 2.00 215.73 34.00 52.02 107.00 163.71 0.00
TAPON HEMBRA PVC DE 1/2" CLASE 10 und 1.69 12.00 2.02 0.42 0.71 0.41 0.69 0.37 0.62
PIEDRA CHANCADA 3/4" m3 59.32 3.00 9224.26 109.39 6,489.13 44.33 2,629.46 1.78 105.67
PIEDRA MEDIANA DE 4" m3 42.37 2.00 67.37 1.59 67.37 0.00 0.00
PIEDRA GRANDE DE 8" m3 42.37 2.00 449.97 10.62 449.97 0.00 0.00
ARENA FINA m3 110.17 2.00 10705.22 2.29 252.29 43.95 4,841.70 50.93 5,611.23
ARENA GRUESA m3 63.56 74.01 14200.58 124.79 7,931.92 81.31 5,168.01 17.32 1,100.65
HORMIGON m3 46.61 29.80 11365.85 78.51 3,659.35 156.18 7,279.32 9.16 427.18
MATERIAL DE AFIRMADO m3 33.90 14.12 2438.09 66.45 2,252.66 5.47 185.43 0.00
TIERRA NEGRA O TURBA m3 144.07 12.16 4957.45 0.00 4.00 576.28 30.41 4,381.17
MALLA ARPILLERA H=2.00 m rll 8.05 1.00 0.00 0.00 0.00 0.00
CEMENTO PORTLAND TIPO I (42.5 kg) bls 22.88 141.00 125314.44 2613.00 59,785.52 2361.13 54,022.69 502.89 11,506.23
YESO BOLSA (20 kg) bls 15.25 40.00 140.30 7.75 118.19 1.45 22.11 0.00
LETRAS METALICAS EN PUERTA DE INGRESO (INCLUYE INSTALACION) glb 847.46 219.93 847.46 0.00 1.00 847.46 0.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 7118.64 3.93 2135.59 0.00 0.00 0.30 2,135.59
ELABORACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO glb 1694.92 31.34 0.00 0.00 0.00 0.00
ENERGIA ELECTRICA PARA LA OBRA mes 169.49 97.19 508.47 1.06 179.12 1.02 173.34 0.92 156.01
FLETE TERRESTRE - INSTALACIONES SANITARIAS glb 675.92 289.48 304.16 0.16 107.15 0.15 103.69 0.14 93.32
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
FLETE TERRESTRE - ARQUITECTURA glb 15116.43 313.27 6802.40 0.16 2,396.30 0.15 2,319.00 0.14 2,087.10
FLETE TERRESTRE - ESTRUCTURAS glb 39053.29 71.92 17573.98 0.16 6,190.83 0.15 5,991.13 0.14 5,392.02
ELECTROBOMBA CENTRIFUGA DE 1 HP und 667.97 34.41 1335.94 0.00 0.00 2.00 1,335.94
ACCESORIOS PARA INSTALACION DE ELECTROBOMBA und 211.86 792.33 423.72 0.00 0.00 2.00 423.72
SERVICIO DE PRUEBAS ELECTRICAS (AISLAMIENRO Y CONTINUIDAD) glb 1271.19 200.95 1271.19 0.00 0.00 1.00 1,271.19
SERVICIO DE PRUEBAS DE NIVEL DE ILUMINACION glb 677.97 52.31 677.97 0.00 0.00 1.00 677.97
FLETE TERRESTRE - INSTALACIONES ELECTRICAS glb 580.86 134.85 261.39 0.16 92.08 0.15 89.11 0.14 80.2
ALQUILER DE TERRENO PARA ACONDICIONAMIENTO DE BOTADERO glb 1271.19 8.00 762.71 0.21 268.68 0.20 260.02 0.18 234.01
TACHO RECOLECTOR DE RESIDUOS 170 LITROS und 139.83 25.66 335.60 0.85 118.22 0.82 114.41 0.74 102.97
CILINDRO VACIO ABIERTO und 50.85 77.61 244.08 1.69 85.98 1.64 83.21 1.47 74.89
HULE DE PLASTICO rll 855.93 10.14 513.56 0.21 180.91 0.20 175.08 0.18 157.57
ALQUILER DE TERRENO PARA ALMACEN DE AGREGADOS PETREOS glb 423.73 30.40 254.23 0.21 89.56 0.20 86.67 0.18 78
MEDIDAS DE CONTROL Y MANEJO DE RESIDUOS LIQUIDOS Y COMBUSTIBLE glb 1271.19 6913.69 762.71 0.21 268.68 0.20 260.02 0.18 234.01
MEDIDAS QUE MITIGUEN LOS IMPACTOS Y RIESGOS GENERADOS POR LA OPERAC glb 1525.42 62.97 915.26 0.21 322.42 0.20 312.02 0.18 280.82
BALDE VACIO DE ACEITE DE 18 LITROS und 5.93 129.67 85.39 5.07 30.08 4.91 29.11 4.42 26.2
ADECUACION DEL PLAN DE VIGILANCIA PREVENCION Y CONTROL DEL COVID-19 D glb 1694.92 39277.37 0.00 0.00 0.00 0.00
LEJIA DESINFECTANTE gln 10.17 154.19 183.07 6.34 64.49 6.14 62.41 5.52 56.17
ALCOHOL 70° l 6.78 1834.57 40.68 2.11 14.33 2.05 13.87 1.84 12.48
DETERGENTE DE 2 kg und 15.25 2486.77 137.25 3.17 48.35 3.07 46.79 2.76 42.11
OVEROL DE PROTECCION BIOLOGICA und 76.27 456.02 457.63 2.11 161.21 2.05 156.01 1.84 140.41
ALCOHOL EN GEL l 21.19 456.02 127.14 2.11 44.79 2.05 43.34 1.84 39.01
BOLSAS ROJAS DE 20x30 pqt 12.71 727.35 38.13 1.06 13.43 1.02 13 0.92 11.7
RESPIRADOR N95 O FFP2 QUIRURGICO und 28.39 3.95 766.54 9.51 270.03 9.20 261.32 8.28 235.19
ACONDICIONAMIENTO DE AMBIENTE Y MOBILIARIO PARA TOPICO glb 508.47 2.00 305.08 0.21 107.47 0.20 104.01 0.18 93.6
ACONDICIONAMIENTO DE ZONA DE CONTROL PREVIO Y DE DESINFECCION glb 338.98 4.00 203.39 0.21 71.65 0.20 69.34 0.18 62.4
CASETA DE CONTROL PREVIO Y DE DESINFECCION m2 440.68 1.67 1586.44 1.27 558.86 1.23 540.83 1.10 486.75
CASETA DE PERSONAL DE SALUD (ENFERMERIA) m2 440.68 117.88 1586.44 1.27 558.86 1.23 540.83 1.10 486.75
FRAGUA kg 4.24 5.56 596.95 0.00 53.41 226.44 87.38 370.51
LADRILLO KK 18 HUECOS 9X13X24 cm und 1.08 44.82 38818.78 21902.69 23,654.90 14040.63 15,163.88 0.00
LADRILLO PASTELERO DE 24X24X 3 cm CON HUECO und 5.08 14.06 783.29 0.00 0.00 154.19 783.29
LADRILLO PARA TECHO DE 15X30X30 cm und 2.29 0.24 4201.17 1834.57 4,201.17 0.00 0.00
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
LADRILLO PARA TECHO DE 12X30X30 cm und 2.20 171.85 5470.89 268.01 589.62 2218.76 4,881.27 0.00
GRASS AMERICANO kg 59.32 9.00 601.50 0.00 0.00 10.14 601.5
PLANTAS ORNAMENTALES und 50.85 510.82 813.60 0.00 0.00 16.00 813.6
FLORES ORNAMENTALES und 6.78 17.65 1356.00 0.00 0.00 200.00 1,356.00
CAJA DE CONCRETO PREFABRICADA DE DESAGUE DE 12" X 24" und 135.59 11.12 542.36 2.00 271.18 2.00 271.18 0.00
CAJA DE CONCRETO PREFABRICADA DE REGISTRO DE AGUA DE 40 X 60 cm und 59.32 1.00 118.64 0.00 2.00 118.64 0.00
PEGAMENTO PARA PVC gln 84.75 1.00 141.54 0.13 11.32 0.98 82.92 0.56 47.3
PEGAMENTO DE CERAMICO (25 KG) bls 15.68 1.00 1936.01 0.00 46.80 733.76 76.67 1,202.25
SILICONA PARA VIDRIOS 300 ml TRANSPARENTE und 11.86 100.74 531.68 0.00 0.00 44.83 531.68
COLA SINTETICA gln 32.20 14288.78 452.41 0.00 0.00 14.05 452.41
LUBRICANTE PARA TUBERIA PVC gln 38.98 4.00 9.36 0.00 0.24 9.36 0.00
ADITIVO IMPERMEABILIZANTE LIQUIDO gln 25.42 96.32 228.78 0.00 0.00 9.00 228.78
CERAMICA DE ALTO TRANSITO 0.45X0.45 m m2 35.59 1.00 18180.09 0.00 200.39 7,132.02 310.43 11,048.07
CERAMICA DE 0.25X0.40 m m3 22.88 11.00 403.83 0.00 0.00 17.65 403.83
RODOPLAST PERFIL DE 8mm x 2.4m m 2.54 40.00 750.95 0.00 107.73 273.63 187.92 477.32
CANALETA PARA COBERTURA m 42.37 112.00 4268.35 0.00 100.74 4,268.35 0.00
TEJA ANDINA (1.14 x 0.72 m e=5 mm) pln 35.59 56.00 25886.39 0.00 124.52 4,431.67 602.83 21,454.72
CUMBRERA SUPERIOR TEJA ANDINA pln 18.64 8.00 8500.02 0.00 38.91 725.28 417.10 7,774.74
CUMBRERA INFERIOR TEJA ANDINA pln 18.64 2736.70 8500.02 0.00 38.91 725.28 417.10 7,774.74
MADERA TORNILLO p2 10.17 138.81 127443.23 5329.81 54,204.15 4817.21 48,991.05 2384.27 24,248.03
MADERA ROLLIZA D=3" L=4.00 m und 21.19 1550.21 0.00 0.00 0.00 0.00
MADERA ROLLIZA D=2" L=3.00 m und 16.95 144.35 0.00 0.00 0.00 0.00
PLANCHA METALICA ESTRIADA 3/16" DE 1.20X2.40 m pln 381.36 40.08 1239.42 0.00 3.25 1,239.42 0.00
PLANCHA DE ACERO NEGRO LAC 1/4" DE 1.20X2.40 m pln 593.22 0.92 71.19 0.00 0.00 0.12 71.19
PLANCHA DE ACERO NEGRO LAC 1/8" DE 1.20X2.40 m pln 254.24 15.70 254.24 0.00 0.00 1.00 254.24
CERRADURA FORTE BK-240 und 63.56 14.33 63.56 0.00 0.00 1.00 63.56
CERRADURA BLINDADA DE 3 GOLPES pza 76.27 8.23 838.97 0.00 0.00 11.00 838.97
CERROJO DE ACERO ZINCADO DE 2" und 12.71 292.15 711.76 0.00 0.00 56.00 711.76
BISAGRA CAPUCHINA DE ACERO ALUMINIZADO 4"x4" und 23.73 343.70 949.20 0.00 0.00 40.00 949.2
BISAGRA CAPUCHINA DE ACERO ALUMINIZADO 2"x2" und 10.17 22.84 1139.04 0.00 0.00 112.00 1,139.04
TIRAFON CON CAPUCHON DE 1/4" X 5" und 1.27 24.00 3475.61 0.00 365.47 464.15 2371.23 3,011.46
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
LIJA PARA MADERA plg 2.54 34.69 352.60 0.00 0.00 138.82 352.6
LIJA PARA PARED plg 2.54 36.95 3937.58 0.00 120.14 305.16 1430.09 3,632.42
PINTURA LATEX SUPERMATE gln 66.10 295.65 9543.51 0.00 11.69 772.97 132.69 8,770.54
PINTURA ESMALTE SINTETICO gln 33.90 1.00 993.27 1.55 52.71 2.17 73.62 25.57 866.94
PINTURA PARA TRAFICO gln 56.78 941.31 52.24 0.00 0.00 0.92 52.24
PINTURA ANTICORROSIVA gln 42.37 1.00 664.79 0.00 1.00 42.37 14.69 622.42
THINNER gln 22.03 1.00 316.57 0.00 1.83 40.24 12.54 276.33
DILUYENTE PARA PINTURA TRAFICO gln 11.02 1.00 90.69 0.00 0.00 8.23 90.69
IMPRIMANTE gln 21.19 1.00 6190.87 0.00 23.65 501.21 268.51 5,689.66
PASTA MURAL gln 29.66 6.00 10195.62 0.00 27.82 825.17 315.93 9,370.45
SELLADOR PARA PARED gln 25.42 1.00 4368.43 0.00 13.92 353.77 157.93 4,014.66
BARNIZ TEKNO gln 72.03 6.00 1645.89 0.00 0.00 22.85 1,645.89
CINTA AISLANTE rll 6.78 4.00 234.99 7.59 51.48 25.43 172.39 1.64 11.12
CINTA TEFLON rll 1.69 526.45 61.09 0.42 0.71 0.41 0.69 35.32 59.69
TIMBRE CAMPANA und 55.08 6.00 55.08 0.00 0.00 1.00 55.08
ALTAVOZ DE BOCINA PARA EXTERIORES und 491.53 100.74 491.53 0.00 0.00 1.00 491.53
CONSOLA PARA ALTAVOZ DE BOCINA und 593.22 6.00 593.22 0.00 0.00 1.00 593.22
VIDRIO CRUDO CATEDRAL LLOVIZNA 3 mm p2 4.24 3.00 3991.20 0.00 0.00 941.32 3,991.20
DESAGUE PARA LAVATORIO 1 1/4" x 8" und 29.66 3.00 177.96 0.00 0.00 6.00 177.96
TUBO DE ABASTO 1/2" und 18.64 1.00 111.84 0.00 0.00 6.00 111.84
TRAMPA BOTELLA PARA LAVATORIO und 21.19 3.00 127.14 0.00 0.00 6.00 127.14
GANCHO DE SOPORTE DE CANALETA und 5.08 12.00 511.76 0.00 100.74 511.76 0.00
OVALIN SONNET BLANCO und 150.85 2.00 905.10 0.00 0.00 6.00 905.1
CODO FIERRO GALVANIZADO DE 1/2" X 90° und 2.12 2.06 6.36 0.00 0.00 3.00 6.36
NIPLE PVC C/R 1/2" und 1.27 2.32 6.35 0.00 0.00 5.00 6.35
NIPLE PVC C/R 3/4" und 1.69 12.00 8.45 0.00 0.00 5.00 8.45
NIPLE DE FIERRO GALVANIZADO DE 1 1/2" x 1 1/2" und 2.54 3.00 30.48 0.00 0.00 12.00 30.48
CODO GALVANIZADO DE 90° DE 1 1/2" und 7.63 2.00 7.63 0.00 0.00 1.00 7.63
CODO GALVANIZADO DE 90° DE 2" und 12.71 2.00 38.13 0.00 0.00 3.00 38.13
TEE GALVANIZADO DE 2" und 16.95 10.32 33.90 0.00 0.00 2.00 33.9
CODO GALVANIZADO DE 90° DE 3/4" und 2.71 1.00 8.13 0.00 0.00 3.00 8.13
UNION SIMPLE GALVANIZADO DE 1 1/2" und 7.63 1.00 17.70 0.00 0.00 2.32 17.7
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
UNION SIMPLE GALVANIZADO DE 3/4" und 3.22 3.00 6.63 0.00 0.00 2.06 6.63
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/2" und 32.20 1.00 386.40 0.00 0.00 12.00 386.4
VALVULA CHECK DE BRONCE 1 1/2" und 131.36 4.00 262.72 0.00 0.00 2.00 262.72
VALVULA DE PIE DE 2" CON CANASTILLA und 105.93 101.46 211.86 0.00 0.00 2.00 211.86
VALVULA DE COMPUERTA DE BRONCE 1 1/2" und 76.27 2.00 305.08 0.00 0.00 4.00 305.08
VALVULA DE PIE DE 3/4" CON CANASTILLA und 49.15 6.00 507.23 0.00 0.00 10.32 507.23
VALVULA ESFERICA DE 1/2" und 21.19 2.00 21.19 0.00 0.00 1.00 21.19
VALVULA ESFERICA DE 3/4" und 29.66 11.00 29.66 0.00 0.00 1.00 29.66
VALVULA ESFERICA JARDIN DE 1/2" und 29.66 2.00 88.98 0.00 0.00 3.00 88.98
VALVULA Y FLOTADOR DE 3/4" und 55.08 5.00 55.08 0.00 0.00 1.00 55.08
SOLDADURA ELECTRICA CELLOCORD DE 1/8" kg 16.95 12.00 1719.75 0.00 41.50 703.43 59.96 1,016.32
GRIFO DE RIEGO DE 1/2" und 29.66 5.00 35.59 0.42 12.54 0.41 12.13 0.37 10.92
GRIFERIA PARA LAVATORIO und 23.73 1.00 142.38 0.00 0.00 6.00 142.38
LAMPARA DE EMERGENCIA 32 LED 1200 LUMENES AUTOMIA MIN. 4 HORAS ILU und 114.41 5.00 1258.51 0.00 11.00 1,258.51 0.00
LUMINARIA CON LAMPARA LED DOBLE DE 2x18 W REJILLA DE PLANCHA DE ACER und 152.54 5.00 7169.38 0.00 37.60 5,735.50 9.40 1,433.88
LUMINARIA CON LAMPARA LED 18 W - INCLUYE ACCESORIOS DE FIJACION und 67.80 10.00 271.20 0.00 4.00 271.2 0.00
REFLECTOR TANGO LED 250 W LUZ FRIA und 1059.32 6.00 4237.28 0.00 4.00 4,237.28 0.00
INTERRUPTOR DIFERENCIAL 2x40A und 156.78 1.00 156.78 0.00 1.00 156.78 0.00
INTERRUPTOR DIFERENCIAL 2x25A und 101.69 5.00 508.45 0.00 5.00 508.45 0.00
INTERRUPTOR DIFERENCIAL 2x20A und 101.69 5.00 508.45 0.00 5.00 508.45 0.00
INTERRUPTOR TERMOMAGNETICO 2x40A und 63.56 54.00 63.56 0.00 1.00 63.56 0.00
INTERRUPTOR TERMOMAGNETICO 2x30A und 55.08 4.00 275.40 0.00 5.00 275.4 0.00
INTERRUPTOR TERMOMAGNETICO 2x20A und 42.37 1.00 211.85 0.00 5.00 211.85 0.00
INTERRUPTOR TERMOMAGNETICO 2x15A und 35.59 1.00 355.90 0.00 10.00 355.9 0.00
INTERRUPTOR UNIPOLAR DOBLE und 13.56 47.70 67.80 0.00 5.00 67.8 0.00
INTERRUPTOR UNIPOLAR SIMPLE und 10.17 1.68 122.04 0.00 12.00 122.04 0.00
INTERRUPTOR UNIPOLAR TRIPLE und 20.34 148.06 101.70 0.00 5.00 101.7 0.00
INTERRUPTOR CONMUTACION SIMPLE und 11.86 168.25 71.16 0.00 6.00 71.16 0.00
TOMACORRIENTE DOBLE + L.T. und 18.64 21.17 1006.56 0.00 54.00 1,006.56 0.00
TOMACORRIENTE DOBLE A PRUEBA DE AGUA + L.T. und 63.56 10.84 254.24 0.00 4.00 254.24 0.00
PLACA RECORDATORIO ACRILICA und 847.46 10.00 847.46 0.00 1.00 847.46 0.00
PULSADOR DE TIMBRE und 11.02 60.00 11.02 0.00 1.00 11.02 0.00
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
CRUCETAS DE 4X4 mm bol 3.39 75.00 161.71 0.00 18.72 63.47 28.98 98.24
CRUCETAS DE 3X3 mm bol 2.97 180.00 4.99 0.00 0.00 1.68 4.99
TUBO DE FIERRO GALVANIZADO DE 2" e=2 mm m 16.95 300.00 2509.62 0.00 0.00 148.06 2,509.62
TUBO DE FIERRO GALVANIZADO DE 1 1/2" e=2 mm m 12.71 5.00 2138.46 0.00 0.00 168.25 2,138.46
MASTIL DE F°N° PARA BANDERA (SEGUN DISEÑO) und 762.71 12.00 762.71 0.00 1.00 762.71 0.00
TUBO DE FIERRO GALVANIZADO DE 1" e=2 mm m 11.30 45.00 239.22 0.00 0.00 21.17 239.22
TUBO REDONDO DE ALUMINIO 30x2.5mm x 2.98 m und 97.46 6250.00 384.97 0.00 0.00 3.95 384.97
CODO DE ALUMINIO 30 mm und 10.17 120.00 309.17 0.00 0.00 30.40 309.17
TAPA 0.90x0.90 m DE PLANCHA METALICA LAF 1/16 Y ANGULOS DE 1"x3/16" (SE und 296.61 40.00 593.22 0.00 0.00 2.00 593.22
TUBO DE FIERRO GALVANIZADO DE 3/4" e=2 mm m 7.08 120.00 76.75 0.00 0.00 10.84 76.75
CASCO PARA INGENIEROS Y TECNICOS und 21.19 80.00 127.14 2.11 44.79 2.05 43.34 1.84 39.01
CASCO DE SEGURIDAD und 21.19 135.00 762.84 12.68 268.73 12.27 260.06 11.05 234.05
ZAPATOS DE SEGURIDAD par 67.80 6.00 4881.59 25.36 1,719.65 24.55 1,664.18 22.09 1,497.76
TAPON DE OIDO und 4.24 5.00 101.76 8.46 35.85 8.18 34.69 7.36 31.22
RESPIRADOR CON FILTRO und 101.69 5.00 732.16 2.54 257.92 2.45 249.6 2.21 224.64
BOTAS DE JEBE par 50.85 5.00 915.30 6.34 322.44 6.14 312.03 5.52 280.83
ROPA DE TRABAJO C/CINTA REFLECTIVA und 67.80 30.00 4881.59 25.36 1,719.65 24.55 1,664.18 22.09 1,497.76
MASCARILLA QUIRURGICA DE TRES CAPAS Y TRES PLIEGUES und 1.53 75.00 5737.50 1321.02 2,021.16 1278.41 1,955.97 1150.57 1,760.37
MAMELUCO CON CAPUCHA (LAVABLE) und 101.69 8.00 4576.06 15.85 1,612.02 15.34 1,560.02 13.81 1,404.02
CARETA TRANSPARENTE und 4.24 150.00 763.19 63.41 268.85 61.36 260.18 55.23 234.16
BATA DESCARTABLE und 27.12 120.00 0.00 0.00 0.00 0.00
CARETA FACIAL TRANSPARENTE PARA PERSONAL DE SALUD und 4.24 40.00 12.72 1.06 4.48 1.02 4.34 0.92 3.9
GUANTES PARA PROTECCION BIOLOGICA par 4.24 2.00 12.72 1.06 4.48 1.02 4.34 0.92 3.9
BOTAS PARA PROTECCION BIOLOGICA par 72.03 30.00 216.09 1.06 76.12 1.02 73.67 0.92 66.3
TRAJE PARA PROTECCION BIOLOGICA und 108.47 20.00 325.41 1.06 114.63 1.02 110.94 0.92 99.84
GUANTES DE CUERO par 12.71 12.00 915.12 25.36 322.37 24.55 311.97 22.09 280.78
GUANTES DE NITRILO par 1.69 4.00 76.05 15.85 26.79 15.34 25.93 13.80 23.33
GUANTES DE JEBE par 10.17 10.00 244.08 8.45 85.98 8.18 83.21 7.36 74.89
GUANTES DE 02 CARAS ANTICORTE par 21.19 10.00 1017.12 16.91 358.3 16.36 346.75 14.73 312.07
CHALECO C/CINTA REFLECTIVA und 10.17 3.00 244.08 8.45 85.98 8.18 83.21 7.36 74.89
LENTES DE PROTECCION und 12.71 2.00 1372.68 38.05 483.56 36.82 467.96 33.14 421.16
CORTAVIENTO PARA CASCO und 12.71 1.00 1143.90 31.70 402.96 30.68 389.97 27.61 350.97
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
BARBIQUEJO und 8.47 2.00 381.15 15.85 134.27 15.34 129.94 13.81 116.94
PONCHO DE AGUA und 55.08 20.00 991.44 6.34 349.26 6.14 337.99 5.52 304.19
ARNES DE SEGURIDAD und 152.54 47.00 1098.29 2.54 386.9 2.45 374.42 2.21 336.97
CINTAS DE SEGURIDAD rll 67.80 10.00 122.03 0.63 42.99 0.61 41.6 0.55 37.44
MALLA DE SEGURIDAD rll 211.86 6.00 1016.93 1.69 358.24 1.64 346.68 1.47 312.01
CONO DE SEÑALIZACION und 50.85 941.31 183.07 1.27 64.49 1.23 62.41 1.10 56.17
CAPACITACION EN SEGURIDAD Y SALUD glb 423.73 51.00 1271.19 1.06 447.81 1.02 433.36 0.92 390.02
FICHA DE SINTOMATOLOGIA COVID-19 und 1.69 96.00 1343.56 280.06 473.3 271.02 458.03 243.92 412.23
APLICACION DE PRUEBAS SEROLOGICAS und 110.17 4.00 8262.75 26.42 2,910.74 25.57 2,816.85 23.01 2,535.16
FICHA EPIDEMIOLOGICA und 1.69 4.00 1343.56 280.06 473.3 271.02 458.03 243.92 412.23
BAJA LENGUA cto 16.95 2.00 0.00 0.00 0.00 0.00
SOGA DE NYLON 3/8" m 4.24 2.00 84.80 0.00 20.00 84.8 0.00
LINEAS DE VIDA HORIZONTAL und 101.69 9.00 244.05 0.85 85.97 0.82 83.2 0.74 74.88
LINEAS DE VIDA VERTICAL und 101.69 47.00 610.14 2.11 214.94 2.05 208 1.84 187.2
EXTINTOR DE POLVO QUIMICO SECO (PQS) 6 Kg und 152.54 4.00 183.04 0.42 64.48 0.41 62.4 0.37 56.16
BOTIQUIN DE PRIMEROS AUXILIOS und 237.29 4.00 142.37 0.21 50.15 0.20 48.54 0.18 43.68
COLLARINES SERVICALES (KIT) und 254.24 1.00 305.09 0.42 107.47 0.41 104.01 0.37 93.61
CAMILLA METALICA TIPO CANASTA DE RESCATE und 550.85 1.00 330.51 0.21 116.43 0.20 112.67 0.18 101.41
SEÑALES DE OBLIGACION PREVENCION PROHIBICION E INFORMACION (SURTIDA) und 59.32 902.13 711.84 4.23 250.76 4.09 242.67 3.68 218.41
FRAZADA und 67.80 1328.57 81.36 0.42 28.66 0.41 27.74 0.37 24.96
SEÑALETICA DE VINIL AUTOADHESIVO DE 0.30x0.20 m und 50.87 1136.46 2390.89 0.00 0.00 47.00 2,390.89
SEÑALES INTERNAS Y EXTERNAS und 63.56 4.20 381.36 2.11 134.34 2.05 130.01 1.84 117.01
LAMINA DE SEGURIDAD p2 2.97 60.48 2795.72 0.00 0.00 941.32 2,795.72
CAJA DE PASE OCTOGONAL SEL 100 X 55 mm und 2.54 76.02 129.54 34.00 86.36 17.00 43.18 0.00
CAJA RECTANGULAR DE PASE PVC 58 X 93 mm und 2.54 99.18 243.84 0.00 96.00 243.84 0.00
CAJA DE REGISTRO CONCRETO PREFABRICADO 30 x 30 cm und 72.03 49.98 288.12 4.00 288.12 0.00 0.00
CAJA DE REGISTRO CONCRETO PREFABRICADO C/TAPA und 42.37 40.98 169.48 0.00 4.00 169.48 0.00
TAPA CIEGA RECTANGULAR PVC 100 X 50 mm und 2.12 2224.49 19.08 0.00 9.00 19.08 0.00
TAPA PARA VALVULA GALVANIZADA DE 15x20 cm und 42.37 1.00 84.74 0.00 2.00 84.74 0.00
TOBOGAN CURVO PLASTICO ROTOMOLDEADO DE COLOR 2.10x1.50x2.00 m und 5508.47 1.00 5508.47 1.00 5,508.47 0.00 0.00
SUBE Y BAJA METALICO DOBLE DE COLOR 3.00x1.20x0.80 m und 2969.10 1.00 2969.10 1.00 2,969.10 0.00 0.00
COLUMPIO CON 03 ASIENTOS 2.60x1.30x2.70 m PREFABRICADO und 3220.34 1.00 3220.34 1.00 3,220.34 0.00 0.00
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
PASAMANOS METALICOS L=2.80 m und 2118.64 1.00 2118.64 1.00 2,118.64 0.00 0.00
CABLE Cu N2XOH 1 x 25 mm2 m 18.64 4.00 78.29 4.20 78.29 0.00 0.00
CABLE Cu N2XOH 1 x 16 mm2 m 11.86 4.00 717.29 60.48 717.29 0.00 0.00
CABLE Cu N2XOH 1 x 10 mm2 m 8.47 12.00 643.89 76.02 643.89 0.00 0.00
CABLE Cu N2XOH 1 x 6 mm2 m 5.93 4.00 588.14 99.18 588.14 0.00 0.00
CABLE Cu N2XOH 1 x 4 mm2 m 5.08 294.00 253.90 49.98 253.9 0.00 0.00
CABLE Cu N2XOH 1 x 2.5 mm2 m 4.24 5.00 173.76 40.98 173.76 0.00 0.00
CABLE Cu NH-80 1 x 2.5 mm2 m 1.86 1.00 2113.82 99.36 184.81 926.59 1,723.46 110.51 205.55
CABLE Cu NH-80 1 x 4 mm2 m 2.54 1.00 3374.54 96.79 245.84 1037.94 2,636.37 193.83 492.33
CABLE Cu NH-80 1 x 6 mm2 m 3.81 1.00 3437.11 93.79 357.34 781.14 2,976.14 27.20 103.63
BARRA REDONDA LISA DE 1/2" und 5.93 1.00 3121.85 0.00 0.00 526.45 3,121.85
PUERTA METALICA 0.70 x 2.15 m (SEGUN DISEÑO) und 593.22 1.00 593.22 0.00 0.00 1.00 593.22
VENTANA METALICA 1.27 x 0.50 m (SEGUN DISEÑO) und 296.61 14.00 296.61 0.00 0.00 1.00 296.61
PUERTA METALICA DOBLE HOJA DE 3.00 x 2.60 m (SEGUN DISEÑO) und 4237.29 12.00 4237.29 0.00 1.00 4,237.29 0.00
ARANDELA PLANA DE 1/2" und 0.42 1.00 934.28 0.00 277.79 116.67 1946.69 817.61
PLANCHA DE TECNOPOR 1.20x2.40 m e=1" pln 15.25 0.09 391.77 16.92 258.03 6.49 98.97 2.28 34.77
VARILLA DE COBRE DE 3/4" X 2.40 m und 271.19 5.00 1084.76 0.00 4.00 1,084.76 0.00
DOSIS THOR GEL DE 5 kg CADA UNA cja 94.96 5.00 1139.52 0.00 12.00 1,139.52 0.00
CONECTOR DE COBRE 3/4" und 8.47 1.00 33.88 0.00 4.00 33.88 0.00
BENTONITA SODICA DE 30 kg bol 27.12 5.00 108.48 0.00 4.00 108.48 0.00
SERVICIO DE PRUEBA DE RESISTENCIA DE PUESTA A TIERRA glb 211.86 1.00 211.86 0.00 0.00 1.00 211.86
CONECTOR PVC-SAP ELECTRICA Ø=20 mm und 0.85 1.00 249.90 68.00 57.8 226.00 192.1 0.00
TABLERO GABINETE METAL BARRA BRONCE 12 POLOS und 313.56 150.00 1567.80 0.00 5.00 1,567.80 0.00
TABLERO GABINETE METAL BARRA BRONCE 24 POLOS und 406.78 30.00 406.78 0.00 1.00 406.78 0.00
TABLERO GABINETE METAL BARRA BRONCE 18 POLOS und 338.98 1112.96 338.98 0.00 1.00 338.98 0.00
GIGANTOGRAFIA 3.60X2.40 m SEGÚN DISEÑO und 135.59 15.00 0.00 0.00 0.00 0.00
ALQUILER DE LOCAL PARA OFICINA Y ALMACEN mes 677.97 79.00 2033.91 1.06 716.49 1.02 693.38 0.92 624.04
JABON LIQUIDO ANTIBACTERIAL X 800 ml PARA DISPENSADOR und 32.20 3.00 1449.00 15.85 510.44 15.34 493.98 13.81 444.58
AGUA m3 2.12 50.00 1870.60 328.49 696.4 411.55 872.48 142.32 301.72
HIPOCLORITO DE CALCIO AL 70% kg 16.95 1325.00 1.70 0.00 0.00 0.10 1.7
PAPEL TOALLA DOBLE HOJA und 3.81 125.00 342.90 31.70 120.79 30.68 116.9 27.61 105.21
AFICHES INFORMATIVOS und 101.69 1325.00 3050.70 10.57 1,074.68 10.23 1,040.01 9.20 936.01
CALENDARIO ACELERADO DE ADQUISICION DE MATERIALES
OBRA:
"REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL,
CENTRO POBLADO DE CATUCANCHA, DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
FECHA:
Oct-22
MATERIALES
VAL 03 VAL 04 VAL 05
PRECIO
METRADO TOTAL S/.
UNID UNIT.S/. METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
Nombre del recurso
PRODUCTOS AGROQUIMICOS sac 118.64 1.00 601.50 0.00 0.00 5.07 601.5
FERTILIZANTE FOLIAR und 42.37 5.00 107.20 0.00 0.00 2.53 107.2
TOTAL MATERIALES
333,645.35 306,844.92 219,152.59
HERRAMIENTAS MANUALES
Nombre del recurso MES 1 01-31 AGOST MES 2 01-30 SET MES 3 01-31 OCT
PRECIO
METRADO TOTAL S/.
UNIDA UNIT.S/.
METRADO PARCIAL S/. METRADO PARCIAL S/. METRADO PARCIAL S/.
DES
HERRAMIENTAS MANUALES 17,521.21 5,339.39 5,684.87 6,496.95
CALENDARIO ACELERADO DE UTILIZACION MAQUINARIAS Y EQUIPOS
ESTACION TOTAL DE PRESICION 1 SEGUNDO INCLUYE ACCESORIOS hm 21.19 1.00 215.07 8.60 182.17 1.55 32.9 0.00
NIVEL DE INGENIERO AUTOMATICO INCLUYE ACCESORIOS hm 8.47 1.00 85.97 8.60 72.82 1.55 13.15 0.00
REGLA DE ALUMINIO 2" X 4" X 10' und 67.80 2.62 2986.82 0.61 41.62 22.10 1,498.30 21.34 1,446.90
CEPILLADORA ELECTRICA hm 101.69 47.09 11722.82 0.00 0.00 115.28 11,722.82
SIERRA CIRCULAR dia 118.64 47.09 6838.41 0.00 0.00 57.64 6,838.41
PLANCHA COMPACTADORA DE 14 HP hm 21.19 1.00 340.27 16.06 340.27 0.00 0.00
VIBROAPISONADOR DE IMPACTO hm 33.90 2.00 917.67 27.07 917.67 0.00 0.00
RODILLO COMPACTADOR DE DOS ROLAS DE 2.5 TN hm 110.17 1.00 2093.53 17.53 1,931.36 1.47 162.17 0.00
SOLDADORA ELECTRICA hm 16.95 1.00 1506.59 0.00 17.33 293.77 71.55 1,212.82
BALDE DE PRUEBA HIDRAULICA - TAPON ABRAZADERA Y ACCESORIOS hm 12.71 1.00 33.36 0.00 0.00 2.62 33.36
ESCOBA CON MANGO PVC und 12.71 1.00 76.26 2.11 26.86 2.05 26 1.84 23.4
TRAPEADOR INDUSTRIAL und 25.42 10.00 305.04 4.23 107.46 4.09 103.99 3.68 93.59
BALDE DE 18 LITROS und 12.71 20.00 76.26 2.11 26.86 2.05 26 1.84 23.4
MOCHILA FUMIGADORA PULVERIZADORA MANUAL 20 LITROS und 322.03 44.03 483.04 0.53 170.16 0.51 164.67 0.46 148.21
LAVADERO DESINFECTANTE (MODALIDAD PEDAL) hm 779.66 115.28 0.00 0.00 0.00 0.00
PROYECTOR MULTIMEDIA dia 127.12 57.64 381.36 1.06 134.34 1.02 130.01 0.92 117.01
COMPUTADORA PORTATIL (LAPTOP) dia 42.37 19.00 127.11 1.06 44.78 1.02 43.33 0.92 39
CAMILLA TOPICA und 355.93 27.76 0.00 0.00 0.00 0.00
BIOMBO DE TRES CUERPOS und 296.61 159.04 0.00 0.00 0.00 0.00
LINTERNA und 84.75 79.83 0.00 0.00 0.00 0.00
TERMOMETRO DIGITAL INFRAROJO und 550.85 39.87 0.00 0.00 0.00 0.00
PULSOMETRO DIGITAL und 152.54 160.06 0.00 0.00 0.00 0.00
BALANZA ELECTRONICA DIGITAL und 322.03 155.44 0.00 0.00 0.00 0.00
TENSIOMETRO DIGITAL DE BRAZO und 381.36 88.88 0.00 0.00 0.00 0.00
SATUROMETRO und 296.61 75.12 0.00 0.00 0.00 0.00
ESTETOSCOPIO und 338.98 73.43 0.00 0.00 0.00 0.00
MARTILLO NEUMATICO DE 29 kg hm 25.42 207.48 0.00 0.00 0.00 0.00
COMPRESORA NEUMATICA DE AIRE GENERADO 185 HP hm 67.80 346.13 0.00 0.00 0.00 0.00
RETROEXCAVADORA CON BRAZO EXTENSIBLE hm 144.07 87.07 887.28 3.10 447.14 2.32 334.05 0.74 106.09
CAMION VOLQUETE DE 15 m3 und 144.07 1.00 988.51 4.52 651.31 2.34 337.2 0.00
VIBRADORA PARA CONCRETO 3.5 HP 2" hm 21.19 1240.88 1545.71 18.44 390.78 50.87 1,077.87 3.64 77.06
VIBRADORA PARA CONCRETO 6.5 HP 1 1/2" hm 29.66 2.50 4351.42 115.95 3,439.18 29.08 862.41 1.68 49.83
MEZCLADORA DE CONCRETO TIPO TROMPO 11 P3 (16 HP) hm 33.90 5.00 8067.94 148.79 5,043.93 83.89 2,843.77 5.32 180.24
MEZCLADORA DE CONCRETO TIPO TROMPO 9 P3 (13 HP) hm 29.66 5.00 2582.59 2.56 75.99 57.90 1,717.42 26.61 789.18
TRONZADORA DE 14" dia 16.95 10.00 1401.31 44.05 746.67 33.87 574.18 4.75 80.46
ANDAMIO METALICO DE 01 CUERPO dia 8.47 2.00 10468.81 54.57 462.22 414.84 3,513.66 766.58 6,492.93
TOTAL S/. 15,253.59 13,754.85 29,474.71
CONSOLIDADO DE MANO DE OBRA , MATERIALES, HERRAMIENTAS MANUALES Y EQUIPOS
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
02.02.01 DESMONTAJE DE MOVILIARIO-MESAS Y SILLAS und 0.00 2.90 307.40 307.40 0.00
02.02.02 DESMONTAJE DE COBERTURAS (INCLUYE ESTRUCTURAS DE TEC m2 0.00 3.92 1,313.79 1,313.79 0.00
02.02.03 DESMONTAJE DE ANTENA PARARRAYO (INCLUYE ACCESORIOS) glb 1.00 1,568.11 1,568.11 0.00 1,568.11 1,568.11
02.02.04 MONTAJE DE ANTENA PARARRAYO (INCLUYE ACCESORIOS). glb 1.00 2,510.77 2,510.77 0.00 2,510.77 2,510.77
02.03 DEMOLICIONES 13,077.97 13,077.97 0.00
02.03.01 DEMOLICION DE MUROS DE ADOBE/QUINCHA m2 0.00 4.11 1,782.14 1,782.14 0.00
02.03.02 DEMOLICION DE PISOS DE CONCREO C/EQUIPO m2 0.00 12.58 11,295.83 11,295.83 0.00
02.04 MOVIMIENTO DE TIERRAS 12,137.80 12,137.80 0.00
02.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 0.00 2.44 2,452.71 2,452.71 0.00
02.04.02 EXCAVACION MASIVA m3 0.00 10.90 9,685.09 9,685.09 0.00
02.05 ELIMINACIONES 24,615.05 24,615.05 0.00
02.05.01 ELIMINACION DE MATERIAL PROVENIENTE DE DEMOLICIONES Y m3 0.00 15.59 24,615.05 24,615.05 0.00
02.06 SEGURIDAD Y SALUD 43,567.92 18,444.12 25,123.80 8,850.43 8,564.93 7,708.44
02.06.01 ELABORACION,IMPLEMENTACION Y ADMINISTRACION DEL PLAN glb 0.00 1,694.92 1,694.92 1,694.92 0.00
02.06.02 EQUIPO DE PROTECCION INDIVIDUAL glb 0.60 30,805.33 30,805.33 12,322.13 18,483.20 6,511.13 6,301.09 5,670.98
02.06.03 EQUIPO DE PROTECCION COLECTIVA glb 0.60 4,949.02 4,949.02 1,979.61 2,969.41 1,046.04 1,012.30 911.07
02.06.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 0.60 2,262.70 2,262.70 905.08 1,357.62 478.25 462.83 416.54
02.06.05 CAPACITACION EN SEGURIDAD Y SALUD glb 0.60 2,118.65 2,118.65 847.46 1,271.19 447.81 433.36 390.02
02.06.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGUR glb 0.60 1,737.30 1,737.30 694.92 1,042.38 367.20 355.36 319.82
02.07 PLAN DE VIGILANCIA PREVENCION Y CONTROL DE COVID-19 73,463.75 33,992.11 39,471.64 13,904.78 13,456.24 12,110.61
02.07.01 ACTIVIDADES DE PREVENCION FRENTE AL COVID-19 67,029.05 28,764.16 38,264.89 13,479.67 13,044.85 11,740.36
02.07.01.01 ELABORACION DEL PLAN DE VIGILANCIA, PREVENCION Y CO glb 0.00 1,694.92 1,694.92 1,694.92 0.00
02.07.01.02 LIMPIEZA Y DESINFECCION EN OBRA mes 3.00 2,341.85 11,709.25 4,683.70 7,025.55 2,474.91 2,395.07 2,155.56
02.07.01.03 EVALUACION DE LA CONDICION DE SALUD DEL TRABAJADOR und 30.00 116.61 5,830.50 2,332.20 3,498.30 1,232.36 1,192.60 1,073.34
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
02.07.01.04 LAVADO Y DESINFECCION DE MANOS (OBLIGATORIO) 5,075.82 2,965.92 2,109.90 743.26 719.28 647.36
02.07.01.04.01 EQUIPAMIENTO PARA EL LAVADO Y DESINFECCION DE MANO und 0.00 779.66 1,559.32 1,559.32 0.00
02.07.01.04.02 INSUMOS PARA EL LAVADO Y DESINFECCION DE MANOS mes 3.00 703.30 3,516.50 1,406.60 2,109.90 743.26 719.28 647.36
02.07.01.05 SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO COVID-1 mes 3.00 1,186.39 5,931.95 2,372.78 3,559.17 1,253.80 1,213.35 1,092.02
02.07.01.06 MEDIDAS PREVENTIVAS COLECTIVAS glb 0.60 6,135.61 6,135.61 2,454.24 3,681.37 1,296.84 1,255.01 1,129.51
02.07.01.07 MEDIDAS DE PROTECCION PERSONAL mes 3.00 3,615.75 18,078.75 7,231.50 10,847.25 3,821.19 3,697.93 3,328.13
02.07.01.08 IDENTIFICACION DE SINTOMALOGIA DEL COVID-19 AL INGRESO mes 3.00 811.20 4,056.00 1,622.40 2,433.60 857.29 829.64 746.67
02.07.01.09 VIGILANCIA DE SALUD DEL TRABAJADOR EN EL CONTEXTO DEL mes 3.00 1,703.25 8,516.25 3,406.50 5,109.75 1,800.03 1,741.96 1,567.76
02.07.02 EQUIPAMIENTO Y MEDIDAS DE PROTECCION DEL PERONAL DE SEGURIDAD Y SALUD EN EL TRABA 6,434.70 5,227.95 1,206.75 425.11 411.39 370.25
02.07.02.01 EQUIPAMIENTO PARA VIGILANCIA DE LA SALUD glb 0.00 4,423.45 4,423.45 4,423.45 0.00
02.07.02.02 MEDIDAS DE PROTECCION PARA PERSONAL DE SEGURIDAD Y mes 3.00 402.25 2,011.25 804.50 1,206.75 425.11 411.39 370.25
02.08 MITIGACION AMBIENTAL 7,242.38 2,896.95 4,345.43 1,530.78 1,481.40 1,333.26
02.08.01 MANEJO DE ESCOMBROS Y MATERIAL EXEDENTE glb 0.60 2,549.18 2,549.18 1,019.67 1,529.51 538.80 521.42 469.28
02.08.02 MANEJO DE CONCRETO EN OBRA glb 0.60 905.93 905.93 362.37 543.56 191.48 185.30 166.77
02.08.03 MANEJO DE AGREGADOS PETREOS(ARENAS,GRAVAS),LADRILLO glb 0.60 990.66 990.66 396.26 594.40 209.39 202.64 182.37
02.08.04 MANEJO DE RESIDUOS LIQUIDOS Y COMBUSTIBLE glb 0.60 1,271.19 1,271.19 508.48 762.71 268.68 260.02 234.01
02.08.05 MANEJO DE MAQUINARIA Y EQUIPO glb 0.60 1,525.42 1,525.42 610.17 915.25 322.42 312.02 280.82
03 MODULO EDIFICIO 1 378,885.24 139,458.30 239,426.92 149,441.37 89,985.60
03.01 OBRAS PRELIMINARES 1,660.72 1,660.72 0.00
03.01.01 TRAZO, REPLANTEO Y NIVELACION INICIAL m2 0.00 3.15 625.75 625.75 0.00
03.01.02 TRAZO, REPLANTEO Y NIVELACION DURANTE LA EJECUCION DE m2 0.00 5.21 1,034.97 1,034.97 0.00
03.02 MOVIMIENTO DE TIERRAS 21,623.99 19,149.75 2,474.24 2,474.24
03.02.01 EXCAVACION MASIVA DE PLATAFORMA m3 0.00 10.90 541.29 541.29 0.00 0.00
03.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS m3 0.00 56.96 7,142.78 7,142.78 0.00
03.02.03 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 0.00 56.96 2,627.56 2,627.56 0.00 0.00
03.02.04 EXCAVACION DE ZANJAS PARA VEREDAS m3 0.00 47.46 267.67 267.67 0.00
03.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 0.00 38.03 2,823.35 2,823.35 0.00
03.02.06 ACARREO DE MATERIAL EXCEDENTE HASTA DP=30M m3 0.00 11.87 2,484.27 2,484.27 0.00
03.02.07 ELIMINACION DE MATERIAL EXCEDENTE m3 0.00 15.59 3,262.83 3,262.83 0.00
03.02.08 AFIRMADO DE E=10 CM PARA PISOS INTERIORES m2 181.13 13.66 2,474.24 0.00 2,474.24 2,474.24
03.03 OBRAS DE CONCRETO SIMPLE 22,416.15 10,003.15 12,412.99 4,815.15 7,597.85
03.03.01 SOLADO-CONCRETO C:H 1:12 e=10 cm. m2 0.00 42.03 2,598.29 2,598.29 0.00
03.03.02 CIMIENTOS CORRIDOS -CONCRETO C:H 1:10+30% PG m3 14.45 204.28 7,705.44 4,753.60 2,951.85 2,951.85
03.03.03 SOBRECIMIENTO 4,514.57 2,651.26 1,863.30 1,863.30
03.03.03.01 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 21.47 64.42 3,049.00 1,665.90 1,383.10 1,383.10
03.03.03.02 SOBRECIMIENTOS-CONCRETOC.H 1:8+ 25% P.M. m3 1.43 295.42 1,338.25 915.80 422.45 422.45
03.03.03.03 CURADO DE CONCRETO m2 21.47 2.69 127.32 69.56 57.75 57.75
03.03.04 VEREDAS 7,597.85 0.00 7,597.84 7,597.85
03.03.04.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 22.56 64.42 1,453.32 0.00 1,453.32 1,453.32
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
03.03.04.02 CONCRETO f'c=175 kg/cm2 m3 15.81 365.05 5,771.44 0.00 5,771.44 5,771.44
03.03.04.03 CURADO DE CONCRETO m2 67.78 2.69 182.33 0.00 182.33 182.33
03.03.04.04 JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION, E=1" m 5.76 10.22 58.87 0.00 58.87 58.87
03.03.04.05 JUNTAS ASFALTICAS DE CONTRACCION E=1" m 17.40 7.58 131.89 0.00 131.89 131.89
03.04 OBRAS DE CONCRETO ARMADO 333,184.38 108,644.68 224,539.69 142,151.98 82,387.75
03.04.01 ZAPATAS 25,284.28 25,284.28 0.00
03.04.01.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 0.00 6.27 8,943.03 8,943.03 0.00
03.04.01.02 CONCRETO f'c=210 kg/cm2 m3 0.00 436.10 16,174.95 16,174.95 0.00
03.04.01.03 CURADO DE CONCRETO m2 0.00 2.69 166.30 166.30 0.00
03.04.02 VIGAS DE CIMENTACION 25,157.74 25,157.74 0.00
03.04.02.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 0.00 6.27 13,287.01 13,287.01 0.00
03.04.02.02 ENCOFRADO Y DESENCOFRADO m2 0.00 83.73 7,028.30 7,028.30 0.00
03.04.02.03 CONCRETO f'c=210 kg/cm2 m3 0.00 436.10 4,574.69 4,574.69 0.00
03.04.02.04 CURADO DE CONCRETO m2 0.00 2.69 267.74 267.74 0.00
03.04.03 COLUMNAS 125,666.21 57,588.51 68,077.71 42,114.21 25,963.50
03.04.03.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,805.02 6.27 56,587.38 45,269.90 11,317.48 11,317.48
03.04.03.02 ENCOFRADO Y DESENCOFRADO m2 313.90 83.73 32,070.26 5,787.42 26,282.85 19,243.81 7,039.04
03.04.03.03 CONCRETO f'c=210 kg/cm2 m3 67.95 436.10 35,978.25 6,345.26 29,633.00 22,307.47 7,325.52
03.04.03.04 CURADO DE CONCRETO m2 313.90 2.69 1,030.32 185.93 844.39 562.92 281.46
03.04.04 COLUMNAS Y VIGAS DE AMARRE 11,086.20 614.15 10,472.05 10,472.06
03.04.04.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 555.08 6.27 4,094.50 614.15 3,480.35 3,480.35
03.04.04.02 ENCOFRADO Y DESENCOFRADO m2 61.01 83.73 5,108.37 0.00 5,108.37 5,108.37
03.04.04.03 CONCRETO f'c=175 kg/cm2 m3 4.01 365.05 1,463.85 0.00 1,463.85 1,463.85
03.04.04.04 CURADO DE CONCRETO m2 61.01 2.69 164.12 0.00 164.12 164.12
03.04.04.05 JUNTAS CON POLIESTIRENO O TECNOPOR, E=1" m 67.20 3.80 255.36 0.00 255.36 255.36
03.04.05 VIGAS 73,869.00 0.00 73,868.99 43,592.93 30,276.06
03.04.05.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 5,596.36 6.27 35,089.18 0.00 35,089.18 18,714.23 16,374.95
03.04.05.02 ENCOFRADO Y DESENCOFRADO m2 276.20 83.73 23,126.23 0.00 23,126.23 11,563.12 11,563.12
03.04.05.03 CONCRETO f'c=210 kg/cm2 m3 34.35 436.10 14,980.04 0.00 14,980.04 13,315.59 1,664.45
03.04.05.04 CURADO DE CONCRETO m2 250.39 2.69 673.55 0.00 673.55 673.55
03.04.06 LOSAS ALIGERADAS 72,120.95 0.00 72,120.95 45,972.77 26,148.18
03.04.06.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,455.39 6.27 9,125.30 0.00 9,125.30 9,125.30
03.04.06.02 ENCOFRADO Y DESENCOFRADO m2 420.40 83.73 35,200.09 0.00 35,200.09 17,600.05 17,600.05
03.04.06.03 CONCRETO f'c=210 kg/cm2 m3 35.24 436.10 15,368.16 0.00 15,368.16 13,660.59 1,707.57
03.04.06.04 LADRILLO HUECO DE ARCILLA PARA TECHO 15X30X30 CM und 1,677.73 3.33 5,586.84 0.00 5,586.84 5,586.84
03.04.06.05 LADRILLO HUECO DE ARCILLA PARA TECHO 12X30X30 CM und 1,824.18 3.13 5,709.68 0.00 5,709.68 5,709.68
03.04.06.06 CURADO DE CONCRETO m2 420.40 2.69 1,130.88 0.00 1,130.88 1,130.88
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
07.01.04.04 CURADO DE CONCRETO m2 197.64 2.69 531.65 0.00 531.65 177.10 354.55
08 MUROS DE CONTENCION Y CERCO PERIMETRICO 224,869.45 93,132.91 131,736.51 79,974.18 44,333.63 7,428.69
08.01 MUROS EN VOLADIZO 152,262.46 80,870.32 71,392.13 71,392.13
08.01.01 OBRAS PRELIMINARES 1,425.13 1,425.13 0.00
08.01.01.01 TRAZO, REPLANTEO Y NIVELACION INICIAL m2 0.00 3.15 536.98 536.98 0.00
08.01.01.02 TRAZO, REPLANTEO Y NIVELACION DURANTE LA EJECUCION D m2 0.00 5.21 888.15 888.15 0.00
08.01.02 MOVIMIENTO DE TIERRAS 14,991.30 12,519.68 2,471.63 2,471.63
08.01.02.01 EXCAVACION DE TERRENO PARA MUROS DE CONTENCION m3 0.00 10.90 3,175.39 3,175.39 0.00
08.01.02.02 REFINE NIVELACION Y COMPACTACION DE EXCAVACION EN M m2 21.95 10.90 1,196.17 956.91 239.27 239.27
08.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONA m3 58.70 38.03 2,232.36 0.00 2,232.36 2,232.36
08.01.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA DP=30M m3 0.00 11.87 3,625.57 3,625.57 0.00
08.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 0.00 15.59 4,761.81 4,761.81 0.00
08.01.03 OBRAS DE CONCRETO SIMPLE 7,164.85 5,732.05 1,432.80 1,432.80
08.01.03.01 SOLADO-CONCRETO C:H 1:12 e=10 cm. m2 34.09 42.03 7,164.85 5,732.05 1,432.80 1,432.80
08.01.04 OBRAS DE CONCRETO ARMADO 128,681.18 61,193.46 67,487.70 67,487.70
08.01.04.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,213.42 6.27 39,725.03 25,846.88 13,878.14 13,878.14
08.01.04.02 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION m2 291.61 69.85 33,947.80 13,578.84 20,368.96 20,368.96
08.01.04.03 CONCRETO f'c=210 kg/cm2 m3 73.23 436.10 53,226.01 21,290.40 31,935.60 31,935.60
08.01.04.04 CURADO DE CONCRETO m2 266.17 2.69 1,193.34 477.34 716.00 716.00
08.01.04.05 JUNTAS ASFALTICAS E=1" m 38.00 15.50 589.00 0.00 589.00 589.00
08.02 CERCO PERIMETRICO DE ALBAÑILERIA 72,606.99 12,262.59 60,344.38 8,582.05 44,333.63 7,428.69
08.02.01 OBRAS PRELIMINARES 295.86 261.74 34.13 34.13
08.02.01.01 TRAZO, REPLANTEO Y NIVELACION INICIAL m2 0.00 3.15 111.48 111.48 0.00
08.02.01.02 TRAZO, REPLANTEO Y NIVELACION DURANTE LA EJECUCION D m2 6.55 5.21 184.38 150.26 34.13 34.13
08.02.02 MOVIMIENTO DE TIERRAS 5,590.99 3,354.94 2,236.03 2,236.04
08.02.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 24.64 56.96 3,509.31 2,105.81 1,403.49 1,403.49
08.02.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONA m3 8.97 38.03 853.01 511.88 341.13 341.13
08.02.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DP=30M m3 15.67 11.87 465.07 279.06 186.00 186.00
08.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 19.59 15.59 763.60 458.19 305.41 305.41
08.02.03 OBRAS DE CONCRETO SIMPLE 9,386.29 3,074.39 6,311.88 6,311.89
08.02.03.01 CIMIENTOS CORRIDOS -CONCRETO C:H 1:10+30% PG m3 7.64 204.28 2,602.53 1,041.83 1,560.70 1,560.70
08.02.03.02 SOBRECIMIENTO 6,783.76 2,032.56 4,751.18 4,751.19
08.02.03.02.01 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 35.30 64.42 3,248.70 974.67 2,274.03 2,274.03
08.02.03.02.02 SOBRECIMIENTOS-CONCRETOC.H 1:8+ 25% P.M. m3 2.65 295.42 1,116.69 333.82 782.86 782.86
08.02.03.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 100.79 6.27 902.82 270.86 631.95 631.95
08.02.03.02.04 CONCRETO f'c=175 kg/cm2 m3 2.65 365.05 1,379.89 412.51 967.38 967.38
08.02.03.02.05 CURADO DE CONCRETO m2 35.30 2.69 135.66 40.70 94.96 94.96
08.02.04 OBRAS DE CONCRETO ARMADO 57,333.85 5,571.52 51,762.33 44,333.63 7,428.69
08.02.04.01 COLUMNAS 31,707.43 5,571.52 26,135.91 18,707.20 7,428.69
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
08.02.04.01.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,332.90 6.27 13,928.81 5,571.52 8,357.28 928.59 7,428.69
08.02.04.01.02 ENCOFRADO Y DESENCOFRADO m2 144.14 83.73 12,068.84 0.00 12,068.84 12,068.84
08.02.04.01.03 CONCRETO f'c=210 kg/cm2 m3 11.90 436.10 5,189.59 0.00 5,189.59 5,189.59
08.02.04.01.04 CURADO DE CONCRETO m2 193.38 2.69 520.19 0.00 520.19 520.19
08.02.04.02 VIGAS 25,626.42 0.00 25,626.43 25,626.42
08.02.04.02.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,173.63 6.27 13,628.66 0.00 13,628.66 13,628.66
08.02.04.02.02 ENCOFRADO Y DESENCOFRADO m2 86.32 83.73 7,227.57 0.00 7,227.57 7,227.57
08.02.04.02.03 CONCRETO f'c=210 kg/cm2 m3 10.39 436.10 4,531.08 0.00 4,531.08 4,531.08
08.02.04.02.04 CURADO DE CONCRETO m2 88.89 2.69 239.11 0.00 239.11 239.11
09 MODULO EDIFICIO 1 324,344.29 4,951.50 319,392.81 18,388.58 86,055.84 214,948.35
09.01 MUROS Y TABIQUES DE ALBAÑILERIA 277.53 39,666.99 4,951.50 34,715.49 18,388.58 16,326.90
09.01.01 MURO DE CABEZA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 198.53 141.31 33,005.78 4,951.50 28,054.27 15,057.97 12,996.30
09.01.02 MURO DE SOGA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 74.77 85.85 6,419.00 0.00 6,419.00 3,209.51 3,209.49
09.01.03 MURO DE CANTO CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 4.23 57.26 242.21 0.00 242.21 121.11 121.11
09.02 REVOQUES Y REVESTIMIENTOS 51,186.22 0.00 51,186.22 26,029.05 25,157.17
09.02.01 TARRAJEO EN MUROS INTERIORES e=1.5 cm, C:A 1:5 m2 438.91 27.14 11,912.02 0.00 11,912.02 6,685.47 5,226.54
09.02.02 TARRAJEO EN MUROS EXTERIORES e=1.5 cm, C:A 1:5 m2 231.66 31.98 7,408.49 0.00 7,408.49 3,704.25 3,704.25
09.02.03 TARRAJEO EN COLUMNAS e=1.5 cm, C:A 1:5 m2 323.84 34.52 11,178.96 0.00 11,178.96 5,589.48 5,589.48
09.02.04 TARRAJEO EN COLUMNAS DE AMARRE e=1.5 cm, C:A 1:5 m2 41.62 34.52 1,436.72 0.00 1,436.72 862.03 574.69
09.02.05 TARRAJEO EN VIGAS e=1.5 cm, C:A 1:5 m2 271.30 40.72 11,047.34 0.00 11,047.34 5,155.42 5,891.91
09.02.06 TARRAJEO EN PROTECCION PLUVIAL e=1.5 cm, C:A 1:5 m2 3.24 34.52 111.84 0.00 111.84 111.84
09.02.07 VESTIDURA DE DERRAMES (A=16CM) e=1.5 cm, C:A 1:5 m 155.57 16.07 2,500.01 0.00 2,500.01 1,388.90 1,111.12
09.02.08 VESTIDURA DE ELEMENTOS DE FACHADA e=1.5 cm, C:A 1:5 m2 13.53 46.79 633.07 0.00 633.07 316.54 316.54
09.02.09 BRUÑAS INTERIORES Y EXTERIORES DE 1 X 1 cm m 484.59 6.87 3,329.13 0.00 3,329.13 1,536.52 1,792.61
09.02.10 CURADO DE CONCRETO EN TARRAJEO DE MUROS,COLUMNAS Y m2 1,324.10 1.23 1,628.64 0.00 1,628.64 678.60 950.04
09.03 CIELO RASOS 18,152.91 0.00 18,152.91 9,076.46 9,076.46
09.03.01 TARRAJEO DE CIELORRASO e=1.5 cm, C:A 1:5 m2 474.09 37.06 17,569.78 0.00 17,569.78 8,784.89 8,784.89
09.03.02 CURADO DE CONCRETO EN TARRAJEO DE CIELORRASO m2 474.09 1.23 583.13 0.00 583.13 291.56 291.56
09.04 PISOS Y PAVIMENTOS 55,062.24 0.00 55,062.24 27,113.39 27,948.85
09.04.01 FALSO PISO Y CONTRAPISO 24,739.66 0.00 24,739.66 16,856.34 7,883.31
09.04.01.01 FALSO PISO DE CONCRETO e=10 cm m2 181.31 49.49 8,973.03 0.00 8,973.03 8,973.03
09.04.01.02 CONTRAPISO DE 40mm, C:A 1:5 m2 404.48 38.98 15,766.63 0.00 15,766.63 7,883.31 7,883.31
09.04.02 PISOS 30,322.58 0.00 30,322.58 10,257.05 20,065.53
09.04.02.01 PISO CERAMICO DE ALTO TRANSITO 0.45X0.45m m2 404.74 65.89 26,668.32 0.00 26,668.32 10,257.05 16,411.27
09.04.02.02 PISO DE CEMENTO PULIDO Y BRUÑADO m2 42.34 68.06 2,881.66 0.00 2,881.66 2,881.66
09.04.02.03 CURADO DE CONCRETO EN PISOS m2 628.13 1.23 772.60 0.00 772.60 772.60
09.05 ZOCALOS Y CONTRAZOCALOS 5,478.16 0.00 5,478.16 2,371.40 3,106.76
09.05.01 CONTRAZOCALOS 5,478.16 0.00 5,478.16 2,371.40 3,106.76
09.05.01.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.30 m m 52.01 14.00 728.14 0.00 728.14 728.14
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
09.05.01.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 18.11 13.92 252.09 0.00 252.09 252.09
09.05.01.03 CONTRAZOCALO CERAMICO DE 0.45X0.10M m 196.76 22.86 4,497.93 0.00 4,497.93 1,391.17 3,106.76
09.06 COBERTURAS 32,257.35 0.00 32,257.35 4,801.27 27,456.08
09.06.01 CORREAS DE MADERA TORNILLO 50X50mm m 334.35 21.54 7,201.90 0.00 7,201.90 4,801.27 2,400.63
09.06.02 COBERTURA CON TEJA ANDINA m2 270.15 80.87 21,847.03 0.00 21,847.03 21,847.03
09.06.03 CUMBRERA CON TEJA ANDINA m 44.58 71.97 3,208.42 0.00 3,208.42 3,208.42
09.07 CARPINTERIA DE MADERA 49,493.11 0.00 49,493.11 49,493.11
09.07.01 PUERTA DE MADERA TORNILLO APANELADA m2 19.95 917.26 18,299.34 0.00 18,299.34 18,299.34
09.07.02 VENTANA DE MADERA TORNILLO m2 68.68 454.19 31,193.77 0.00 31,193.77 31,193.78
09.08 CERRAJERIA 179.00 5,594.96 0.00 5,594.96 5,594.96
09.08.01 BISAGRA TIPO CAPUCHINA ALUMINIZADA DE 4" X 4" und 28.00 40.36 1,130.08 0.00 1,130.08 1,130.08
09.08.02 BISAGRA TIPO CAPUCHINA ALUMINIZADA DE 2" X2" und 96.00 22.64 2,173.44 0.00 2,173.44 2,173.44
09.08.03 CERRADURA PARA PUERTAS und 7.00 126.16 883.12 0.00 883.12 883.12
09.08.04 CERROJO DE 2" und 48.00 29.34 1,408.32 0.00 1,408.32 1,408.32
09.09 VIDRIOS, CRISTALES Y SIMILARES 9,183.30 0.00 9,183.30 9,183.30
09.09.01 VIDRIO CRUDO MAS LAMINADO DE SEGURIDAD p2 795.78 11.54 9,183.30 0.00 9,183.30 9,183.30
09.10 PINTURA 56,965.39 0.00 56,965.40 56,965.39
09.10.01 PINTURA LATEX 53,102.23 0.00 53,102.23 53,102.23
09.10.01.01 PINTURA DE CIELORASSO LATEX 2 MANOS,INC. IMPRIMANTE m2 474.09 27.36 12,971.10 0.00 12,971.10 12,971.10
09.10.01.02 PINTURA DE MUROS INTERIORES Y EXTERIORES LATEX 02 MA m2 670.57 29.77 19,962.87 0.00 19,962.87 19,962.87
09.10.01.03 PINTURA EN SUPERRFICIES DE COLUMNAS LATEX 2 MANOS,IN m2 323.84 29.77 9,640.72 0.00 9,640.72 9,640.72
09.10.01.04 PINTURA EN SUPERFICIES DE COLUMNAS DE AMARRE LATEX m2 41.62 27.36 1,138.72 0.00 1,138.72 1,138.72
09.10.01.05 PINTURA EN SUPERFICIES DE VIGAS , LATEX 2 MANOS,INC. IM m2 271.30 29.77 8,076.60 0.00 8,076.60 8,076.60
09.10.01.06 PINTURA EN PROTECCION PLUVIAL , LATEX 2 MANOS,INC. IMP m2 2.16 26.94 58.19 0.00 58.19 58.19
09.10.01.07 PINTURA EN VESTIDURAS , LATEX 2 MANOS,INC. IMPRIMANTE m2 38.42 32.64 1,254.03 0.00 1,254.03 1,254.03
09.10.02 PINTURA ESMALTE 1,083.35 0.00 1,083.35 1,083.35
09.10.02.01 PINTURA ESMALTE EN CONTRAZOCALO EXTERIOR. m 70.12 15.45 1,083.35 0.00 1,083.35 1,083.35
09.10.03 SELLADORA Y/O BARNIZ 2,779.81 0.00 2,779.82 2,779.81
09.10.03.01 PINTURA BARNIZ EN CARPINTERIA DE MADERA-PUERTAS m2 39.90 21.06 840.29 0.00 840.29 840.29
09.10.03.02 PINTURA BARNIZ EN CARPINTERIA DE MADERA-VENTANAS m2 137.36 14.12 1,939.52 0.00 1,939.52 1,939.52
09.11 VARIOS 1,303.66 0.00 1,303.66 337.38 966.28
09.11.01 GARGOLA DE CONCRETO und 3.00 112.46 337.38 0.00 337.38 337.38
09.11.02 LIMPIEZA FINAL DE OBRA m2 508.57 1.90 966.28 0.00 966.28 966.28
10 MODULO EDIFICIO 1a 55,229.98 1,182.76 54,047.22 11,763.97 34,378.74 7,904.51
10.01 MUROS Y TABIQUES DE ALBAÑILERIA 9,839.92 1,182.76 8,657.17 8,657.16
10.01.01 MURO DE CABEZA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 47.45 141.31 7,887.92 1,182.76 6,705.16 6,705.16
10.01.02 MURO DE SOGA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 21.17 85.85 1,817.44 0.00 1,817.44 1,817.44
10.01.03 MURO DE CANTO CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 2.35 57.26 134.56 0.00 134.56 134.56
10.02 REVOQUES Y REVESTIMIENTOS 12,087.90 0.00 12,087.91 12,087.90
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
10.02.01 TARRAJEO EN MUROS INTERIORES e=1.5 cm, C:A 1:5 m2 87.04 27.14 2,362.27 0.00 2,362.27 2,362.27
10.02.02 TARRAJEO EN MUROS EXTERIORES e=1.5 cm, C:A 1:5 m2 75.18 31.98 2,404.26 0.00 2,404.26 2,404.26
10.02.03 TARRAJEO EN COLUMNAS e=1.5 cm, C:A 1:5 m2 35.96 34.52 1,241.34 0.00 1,241.34 1,241.35
10.02.04 TARRAJEO EN COLUMNAS DE AMARRE e=1.5 cm, C:A 1:5 m2 4.31 34.52 148.78 0.00 148.78 148.78
10.02.05 TARRAJEO EN VIGAS e=1.5 cm, C:A 1:5 m2 34.38 40.72 1,399.95 0.00 1,399.95 1,399.95
10.02.06 TARRAJEO EN PROTECCION PLUVIAL e=1.5 cm, C:A 1:5 m2 2.16 34.52 74.56 0.00 74.56 74.56
10.02.07 TARRAJEO EN LA SUPERFICIE INTERIOR DE LA ESCALERA m2 6.31 40.95 258.39 0.00 258.39 258.39
10.02.08 TARRAJEO EN GRADAS Y ESCALERAS E=5CM, CA 1:4 m 51.48 49.69 2,558.04 0.00 2,558.04 2,558.04
10.02.09 TARRAJEO EN DESCANSOS e=5cm, C:A 1:4 m2 9.51 44.79 425.95 0.00 425.95 425.95
10.02.10 VESTIDURA DE DERRAMES (A=16CM) e=1.5 cm, C:A 1:5 m 9.50 16.07 152.67 0.00 152.67 152.67
10.02.11 VESTIDURA DE ELEMENTOS DE FACHADA e=1.5 cm, C:A 1:5 m2 3.75 46.79 175.46 0.00 175.46 175.46
10.02.12 BRUÑAS INTERIORES Y EXTERIORES DE 1 X 1 cm m 83.08 6.87 570.76 0.00 570.76 570.76
10.02.13 CURADO DE CONCRETO EN TARRAJEO DE MUROS,COLUMNAS Y m2 256.48 1.23 315.47 0.00 315.47 315.47
10.03 CIELO RASOS 2,043.15 0.00 2,043.15 2,043.15
10.03.01 TARRAJEO DE CIELORRASO e=1.5 cm, C:A 1:5 m2 53.36 37.06 1,977.52 0.00 1,977.52 1,977.52
10.03.02 CURADO DE CONCRETO EN TARRAJEO DE CIELORRASO m2 53.36 1.23 65.63 0.00 65.63 65.63
10.04 PISOS Y PAVIMENTOS 5,200.06 0.00 5,200.06 951.20 4,248.86
10.04.01 FALSO PISO Y CONTRAPISO 951.20 0.00 951.20 951.20
10.04.01.01 FALSO PISO DE CONCRETO e=10 cm m2 19.22 49.49 951.20 0.00 951.20 951.20
10.04.02 PISOS 4,248.86 0.00 4,248.86 4,248.86
10.04.02.01 PISO DE CEMENTO PULIDO Y BRUÑADO m2 61.32 68.06 4,173.44 0.00 4,173.44 4,173.44
10.04.02.02 CURADO DE CONCRETO EN PISOS m2 61.32 1.23 75.42 0.00 75.42 75.42
10.05 ZOCALOS Y CONTRAZOCALOS 744.12 0.00 744.12 744.12
10.05.01 CONTRAZOCALOS 744.12 0.00 744.12 744.12
10.05.01.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.30 m m 11.60 14.00 162.40 0.00 162.40 162.40
10.05.01.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 41.79 13.92 581.72 0.00 581.72 581.72
10.06 COBERTURAS 5,615.23 0.00 5,615.22 5,615.23
10.06.01 CORREAS DE MADERA TORNILLO 50X50mm m 62.76 21.54 1,351.85 0.00 1,351.85 1,351.85
10.06.02 COBERTURA CON TEJA ANDINA m2 43.41 80.87 3,510.57 0.00 3,510.57 3,510.57
10.06.03 CUMBRERA CON TEJA ANDINA m 10.46 71.97 752.81 0.00 752.81 752.81
10.07 CARPINTERIA DE MADERA 2,804.43 0.00 2,804.43 2,804.43
10.07.01 PUERTA DE MADERA TORNILLO APANELADA m2 2.28 917.26 2,091.35 0.00 2,091.35 2,091.35
10.07.02 VENTANA DE MADERA TORNILLO m2 1.57 454.19 713.08 0.00 713.08 713.08
10.08 CARPINTERIA METALICA 6,068.95 0.00 6,068.95 3,676.40 2,392.56
10.08.01 PASAMANO DE TUBO F°G° 2", e=2mm m 16.00 81.44 1,303.04 0.00 1,303.04 1,303.04
10.08.02 TAPA JUNTA CON PLANCHA LAC 6"X1/4" m 2.00 71.12 142.24 0.00 142.24 142.24
10.08.03 TAPA JUNTA CON PLANCHA LAC 6"X1/8" m 16.05 59.02 947.27 0.00 947.27 947.27
10.08.04 CANTONERA DE PLANCHA ESTRIADA 6"X3/16" m 52.00 70.70 3,676.40 0.00 3,676.40 3,676.40
10.09 CERRAJERIA 436.84 0.00 436.84 436.84
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
10.09.01 BISAGRA TIPO CAPUCHINA ALUMINIZADA DE 4" X 4" und 4.00 40.36 161.44 0.00 161.44 161.44
10.09.02 BISAGRA TIPO CAPUCHINA ALUMINIZADA DE 2" X2" und 4.00 22.64 90.56 0.00 90.56 90.56
10.09.03 CERRADURA PARA PUERTAS und 1.00 126.16 126.16 0.00 126.16 126.16
10.09.04 CERROJO DE 2" und 2.00 29.34 58.68 0.00 58.68 58.68
10.10 VIDRIOS, CRISTALES Y SIMILARES 269.81 0.00 269.81 269.81
10.10.01 VIDRIO CRUDO MAS LAMINADO DE SEGURIDAD p2 23.38 11.54 269.81 0.00 269.81 269.81
10.11 PINTURA 9,870.35 0.00 9,870.35 8,006.23 1,864.11
10.11.01 PINTURA LATEX 8,905.10 0.00 8,905.10 7,456.32 1,448.79
10.11.01.01 PINTURA DE CIELORASSO LATEX 2 MANOS,INC. IMPRIMANTE m2 53.36 27.36 1,459.93 0.00 1,459.93 1,459.93
10.11.01.02 PINTURA DE MUROS INTERIORES Y EXTERIORES LATEX 02 MA m2 162.22 29.77 4,829.29 0.00 4,829.29 3,380.50 1,448.79
10.11.01.03 PINTURA EN SUPERRFICIES DE COLUMNAS LATEX 2 MANOS,IN m2 35.96 29.77 1,070.53 0.00 1,070.53 1,070.53
10.11.01.04 PINTURA EN SUPERFICIES DE COLUMNAS DE AMARRE LATEX m2 4.31 27.36 117.92 0.00 117.92 117.92
10.11.01.05 PINTURA EN SUPERFICIES DE VIGAS , LATEX 2 MANOS,INC. IM m2 34.38 29.77 1,023.49 0.00 1,023.49 1,023.49
10.11.01.06 PINTURA EN PROTECCION PLUVIAL , LATEX 2 MANOS,INC. IMP m2 2.16 26.94 58.19 0.00 58.19 58.19
10.11.01.07 PINTURA EN VESTIDURAS , LATEX 2 MANOS,INC. IMPRIMANTE m2 5.27 32.64 172.01 0.00 172.01 172.01
10.11.01.08 PINTURA EN SUPERFICIES INTERIORES DE ESCALERA, LATEX m2 6.35 27.36 173.74 0.00 173.74 173.74
10.11.02 PINTURA ESMALTE 824.88 0.00 824.88 549.92 274.96
10.11.02.01 PINTURA ESMALTE EN CONTRAZOCALO EXTERIOR. m 53.39 15.45 824.88 0.00 824.88 549.92 274.96
10.11.03 SELLADORA Y/O BARNIZ 140.37 0.00 140.37 140.37
10.11.03.01 PINTURA BARNIZ EN CARPINTERIA DE MADERA-PUERTAS m2 4.56 21.06 96.03 0.00 96.03 96.03
10.11.03.02 PINTURA BARNIZ EN CARPINTERIA DE MADERA-VENTANAS m2 3.14 14.12 44.34 0.00 44.34 44.34
10.12 VARIOS 249.22 0.00 249.22 112.46 136.76
10.12.01 GARGOLA DE CONCRETO und 1.00 112.46 112.46 0.00 112.46 112.46
10.12.02 LIMPIEZA FINAL DE OBRA m2 71.98 1.90 136.76 0.00 136.76 136.76
11 MODULO EDIFICIO 2 41,809.15 794.16 41,015.01 2,251.78 22,345.05 16,418.16
11.01 MUROS Y TABIQUES DE ALBAÑILERIA 6,374.61 794.16 5,580.45 2,251.77 3,328.68
11.01.01 MURO DE CABEZA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 31.87 141.31 5,297.71 794.16 4,503.55 2,251.77 2,251.77
11.01.02 MURO DE SOGA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 11.05 85.85 948.64 0.00 948.64 948.64
11.01.03 MURO DE CANTO CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 2.24 57.26 128.26 0.00 128.26 128.26
11.02 REVOQUES Y REVESTIMIENTOS 6,921.13 0.00 6,921.13 6,921.13
11.02.01 TARRAJEO EN MUROS INTERIORES e=1.5 cm, C:A 1:5 m2 63.22 27.14 1,715.79 0.00 1,715.79 1,715.79
11.02.02 TARRAJEO EN MUROS EXTERIORES e=1.5 cm, C:A 1:5 m2 45.75 31.98 1,463.09 0.00 1,463.09 1,463.09
11.02.03 TARRAJEO EN COLUMNAS e=1.5 cm, C:A 1:5 m2 24.45 34.52 844.01 0.00 844.01 844.01
11.02.04 TARRAJEO EN COLUMNAS DE AMARRE e=1.5 cm, C:A 1:5 m2 10.00 34.52 345.20 0.00 345.20 345.20
11.02.05 TARRAJEO EN VIGAS e=1.5 cm, C:A 1:5 m2 26.33 40.72 1,072.16 0.00 1,072.16 1,072.16
11.02.06 TARRAJEO EN PROTECCION PLUVIAL e=1.5 cm, C:A 1:5 m2 2.16 34.52 74.56 0.00 74.56 74.56
11.02.07 VESTIDURA DE DERRAMES (A=16CM) e=1.5 cm, C:A 1:5 m 19.80 16.07 318.19 0.00 318.19 318.19
11.02.08 VESTIDURA DE ELEMENTOS DE FACHADA e=1.5 cm, C:A 1:5 m2 5.79 46.79 270.91 0.00 270.91 270.91
11.02.09 BRUÑAS INTERIORES Y EXTERIORES DE 1 X 1 cm m 87.14 6.87 598.65 0.00 598.65 598.65
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
11.02.10 CURADO DE CONCRETO EN TARRAJEO DE MUROS,COLUMNAS Y m2 177.70 1.23 218.57 0.00 218.57 218.57
11.03 CIELO RASOS 1,496.76 0.00 1,496.76 1,496.76
11.03.01 TARRAJEO DE CIELORRASO e=1.5 cm, C:A 1:5 m2 39.09 37.06 1,448.68 0.00 1,448.68 1,448.68
11.03.02 CURADO DE CONCRETO EN TARRAJEO DE CIELORRASO m2 39.09 1.23 48.08 0.00 48.08 48.08
11.04 PISOS Y PAVIMENTOS 3,586.46 0.00 3,586.46 3,586.45
11.04.01 FALSO PISO Y CONTRAPISO 2,023.31 0.00 2,023.31 2,023.31
11.04.01.01 FALSO PISO DE CONCRETO e=10 cm m2 22.87 49.49 1,131.84 0.00 1,131.84 1,131.84
11.04.01.02 CONTRAPISO DE 40mm, C:A 1:5 m2 22.87 38.98 891.47 0.00 891.47 891.47
11.04.02 PISOS 1,563.15 0.00 1,563.15 1,563.15
11.04.02.01 PISO CERAMICO DE ALTO TRANSITO 0.45X0.45m m2 22.87 65.89 1,506.90 0.00 1,506.90 1,506.90
11.04.02.02 CURADO DE CONCRETO EN PISOS m2 45.73 1.23 56.25 0.00 56.25 56.25
11.05 ZOCALOS Y CONTRAZOCALOS 873.97 0.00 873.97 873.97
11.05.01 CONTRAZOCALOS 873.97 0.00 873.97 873.97
11.05.01.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.30 m m 20.56 14.00 287.84 0.00 287.84 287.84
11.05.01.02 CONTRAZOCALO CERAMICO DE 0.45X0.10M m 25.64 22.86 586.13 0.00 586.13 586.13
11.06 COBERTURAS 6,138.07 0.00 6,138.07 6,138.07
11.06.01 CORREAS DE MADERA TORNILLO 50X50mm m 68.13 21.54 1,467.52 0.00 1,467.52 1,467.52
11.06.02 COBERTURA CON TEJA ANDINA m2 44.28 80.87 3,580.92 0.00 3,580.92 3,580.92
11.06.03 CUMBRERA CON TEJA ANDINA m 15.14 71.97 1,089.63 0.00 1,089.63 1,089.63
11.07 CARPINTERIA DE MADERA 7,268.25 0.00 7,268.25 7,268.25
11.07.01 PUERTA DE MADERA TORNILLO APANELADA m2 4.74 917.26 4,347.81 0.00 4,347.81 4,347.81
11.07.02 VENTANA DE MADERA TORNILLO m2 6.43 454.19 2,920.44 0.00 2,920.44 2,920.44
11.08 CERRAJERIA 1,022.92 0.00 1,022.92 1,022.92
11.08.01 BISAGRA TIPO CAPUCHINA ALUMINIZADA DE 4" X 4" und 8.00 40.36 322.88 0.00 322.88 322.88
11.08.02 BISAGRA TIPO CAPUCHINA ALUMINIZADA DE 2" X2" und 12.00 22.64 271.68 0.00 271.68 271.68
11.08.03 CERRADURA PARA PUERTAS und 2.00 126.16 252.32 0.00 252.32 252.32
11.08.04 CERROJO DE 2" und 6.00 29.34 176.04 0.00 176.04 176.04
11.09 VIDRIOS, CRISTALES Y SIMILARES 892.39 0.00 892.39 892.39
11.09.01 VIDRIO CRUDO MAS LAMINADO DE SEGURIDAD p2 77.33 11.54 892.39 0.00 892.39 892.39
11.10 PINTURA 7,148.52 0.00 7,148.53 7,148.52
11.10.01 PINTURA LATEX 6,449.50 0.00 6,449.50 6,449.49
11.10.01.01 PINTURA DE CIELORASSO LATEX 2 MANOS,INC. IMPRIMANTE m2 39.09 27.36 1,069.50 0.00 1,069.50 1,069.50
11.10.01.02 PINTURA DE MUROS INTERIORES Y EXTERIORES LATEX 02 MA m2 108.97 29.77 3,244.04 0.00 3,244.04 3,244.04
11.10.01.03 PINTURA EN SUPERRFICIES DE COLUMNAS LATEX 2 MANOS,IN m2 24.45 29.77 727.88 0.00 727.88 727.88
11.10.01.04 PINTURA EN SUPERFICIES DE COLUMNAS DE AMARRE LATEX m2 10.00 27.36 273.60 0.00 273.60 273.60
11.10.01.05 PINTURA EN SUPERFICIES DE VIGAS , LATEX 2 MANOS,INC. IM m2 26.33 29.77 783.84 0.00 783.84 783.84
11.10.01.06 PINTURA EN PROTECCION PLUVIAL , LATEX 2 MANOS,INC. IMP m2 2.16 26.94 58.19 0.00 58.19 58.19
11.10.01.07 PINTURA EN VESTIDURAS , LATEX 2 MANOS,INC. IMPRIMANTE m2 8.96 32.64 292.45 0.00 292.45 292.45
11.10.02 PINTURA ESMALTE 317.65 0.00 317.65 317.65
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
11.10.02.01 PINTURA ESMALTE EN CONTRAZOCALO EXTERIOR. m 20.56 15.45 317.65 0.00 317.65 317.65
11.10.03 SELLADORA Y/O BARNIZ 381.37 0.00 381.37 381.37
11.10.03.01 PINTURA BARNIZ EN CARPINTERIA DE MADERA-PUERTAS m2 9.48 21.06 199.65 0.00 199.65 199.65
11.10.03.02 PINTURA BARNIZ EN CARPINTERIA DE MADERA-VENTANAS m2 12.87 14.12 181.72 0.00 181.72 181.72
11.11 VARIOS 45.30 86.07 0.00 86.07 86.07
11.11.01 LIMPIEZA FINAL DE OBRA m2 45.30 1.90 86.07 0.00 86.07 86.07
12 OBRAS EXTERIORES 4.00 24,304.19 0.00 24,304.19 15,615.68 8,688.50
12.01 AREA DE JUEGOS 4.00 15,615.68 0.00 15,615.68 15,615.68
12.01.01 TOBOGAN CURVO PLASTICO ROTOMOLDEADO und 1.00 5,953.84 5,953.84 0.00 5,953.84 5,953.84
12.01.02 SUBE Y BAJA DOBLE CON 04 ASIENTOS und 1.00 3,395.69 3,395.69 0.00 3,395.69 3,395.69
12.01.03 COLUMPIO CON 03 ASIENTOS DE GOMA und 1.00 3,716.53 3,716.53 0.00 3,716.53 3,716.53
12.01.04 PASAMANO METALICO L=2.80m (JUEGO INFANTIL) und 1.00 2,549.62 2,549.62 0.00 2,549.62 2,549.62
12.02 PUERTA DE INGRESO PRINCIPAL 8,688.51 0.00 8,688.51 8,688.50
12.02.01 REVOQUES Y REVESTIMIENTOS 942.28 0.00 942.28 942.28
12.02.01.01 TARRAJEO EN COLUMNAS e=1.5 cm, C:A 1:5 m2 6.94 34.52 239.57 0.00 239.57 239.57
12.02.01.02 TARRAJEO EN VIGAS e=1.5 cm, C:A 1:5 m2 15.84 40.72 645.00 0.00 645.00 645.00
12.02.01.03 BRUÑAS INTERIORES Y EXTERIORES DE 1 X 1 cm m 8.40 6.87 57.71 0.00 57.71 57.71
12.02.02 CARPINTERIA METALICA 3.00 7,068.07 0.00 7,068.07 7,068.07
12.02.02.01 PUERTA METALICA DOBLE HOJA DE 3.00X2.60M EN INGRESO und 1.00 5,323.26 5,323.26 0.00 5,323.26 5,323.26
12.02.02.02 LETRAS METALICAS EN PUERA DE INGRESO glb 1.00 847.46 847.46 0.00 847.46 847.46
12.02.02.03 PLACA RECORDATORIA und 1.00 897.35 897.35 0.00 897.35 897.35
12.02.03 PINTURA 678.16 0.00 678.16 678.16
12.02.03.01 PINTURA LATEX 678.16 0.00 678.16 678.16
12.02.03.01.01 PINTURA EN SUPERRFICIES DE COLUMNAS LATEX 2 MANOS,I m2 6.94 29.77 206.60 0.00 206.60 206.60
12.02.03.01.02 PINTURA EN SUPERFICIES DE VIGAS , LATEX 2 MANOS,INC. m2 15.84 29.77 471.56 0.00 471.56 471.56
13 OBRAS COMPLEMENTARIAS 18,177.39 0.00 18,177.38 975.67 17,201.71
13.01 CISTERNA Y TANQUE ELEVADO 18,177.39 0.00 18,177.38 975.67 17,201.71
13.01.01 MUROS Y TABIQUES DE ALBAÑILERIA 704.00 0.00 704.00 704.00
13.01.01.01 MURO DE SOGA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 7.40 85.85 635.29 0.00 635.29 635.29
13.01.01.02 MURO DE CANTO CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 1.20 57.26 68.71 0.00 68.71 68.71
13.01.02 REVOQUES Y REVESTIMIENTOS 7,020.35 0.00 7,020.34 271.67 6,748.69
13.01.02.01 TARRAJEO EN MUROS INTERIORES e=1.5 cm, C:A 1:5 m2 10.01 27.14 271.67 0.00 271.67 271.67
13.01.02.02 TARRAJEO EN MUROS EXTERIORES e=1.5 cm, C:A 1:5 m2 25.35 31.98 810.69 0.00 810.69 810.69
13.01.02.03 TARRAJEO EN COLUMNAS e=1.5 cm, C:A 1:5 m2 51.26 34.52 1,769.50 0.00 1,769.50 1,769.50
13.01.02.04 TARRAJEO EN COLUMNAS DE AMARRE e=1.5 cm, C:A 1:5 m2 4.00 34.52 138.08 0.00 138.08 138.08
13.01.02.05 TARRAJEO EN VIGAS e=1.5 cm, C:A 1:5 m2 39.16 40.72 1,594.60 0.00 1,594.60 1,594.60
13.01.02.06 TARRAJEO EN CEMENTO PULIDO CON IMPERMEABILIZANTE H m2 40.91 39.26 1,606.13 0.00 1,606.13 1,606.13
13.01.02.07 VESTIDURA DE DERRAMES (A=16CM) e=1.5 cm, C:A 1:5 m 6.57 16.07 105.58 0.00 105.58 105.58
13.01.02.08 BRUÑAS INTERIORES Y EXTERIORES DE 1 X 1 cm m 74.84 6.87 514.15 0.00 514.15 514.15
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
13.01.02.09 CURADO DE CONCRETO EN TARRAJEO DE MUROS,COLUMNAS Y m2 170.69 1.23 209.95 0.00 209.95 209.95
13.01.03 CIELO RASOS 121.38 0.00 121.38 121.39
13.01.03.01 TARRAJEO DE CIELORRASO e=1.5 cm, C:A 1:5 m2 3.17 37.06 117.48 0.00 117.48 117.48
13.01.03.02 CURADO DE CONCRETO EN TARRAJEO DE CIELORRASO m2 3.17 1.23 3.90 0.00 3.90 3.90
13.01.04 PISOS Y PAVIMENTOS 347.12 0.00 347.12 347.11
13.01.04.01 CONTRAPISO DE 40mm, C:A 1:5 m2 3.17 38.98 123.57 0.00 123.57 123.57
13.01.04.02 PISO DE CEMENTO PULIDO Y BRUÑADO m2 3.17 68.06 215.75 0.00 215.75 215.75
13.01.04.03 CURADO DE CONCRETO EN PISOS m2 6.34 1.23 7.80 0.00 7.80 7.80
13.01.05 ZOCALOS Y CONTRAZOCALOS 215.76 0.00 215.76 215.76
13.01.05.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 15.50 13.92 215.76 0.00 215.76 215.76
13.01.06 COBERTURAS 1,061.64 0.00 1,061.64 1,061.64
13.01.06.01 CUBIERTA CON LADRILLO PASTELERO m2 9.07 117.05 1,061.64 0.00 1,061.64 1,061.64
13.01.07 CARPINTERIA METALICA 4,492.46 0.00 4,492.45 4,492.46
13.01.07.01 PUERTA METALICA DE 0.70X2.15M EN CASETA DE CISTERNA(S und 1.00 922.58 922.58 0.00 922.58 922.58
13.01.07.02 VENTANA METALICA DE 1.27X0.50M EN CASETA DE CISTERNA und 1.00 395.49 395.49 0.00 395.49 395.49
13.01.07.03 ESCALERA METALICA DE GATO m 11.14 133.04 1,482.07 0.00 1,482.07 1,482.07
13.01.07.04 ESCALERA DE ALUMINIO (DE GATO) m 3.04 271.98 826.82 0.00 826.82 826.82
13.01.07.05 TAPA METALICA 0.90X0.90m EN TANQUE ELEVADO Y CISTERNA und 2.00 432.75 865.50 0.00 865.50 865.50
13.01.08 PINTURA 4,214.68 0.00 4,214.69 4,214.67
13.01.08.01 PINTURA LATEX 3,975.20 0.00 3,975.21 3,975.19
13.01.08.01.01 PINTURA DE CIELORASSO LATEX 2 MANOS,INC. IMPRIMANTE m2 3.17 27.36 86.73 0.00 86.73 86.73
13.01.08.01.02 PINTURA DE MUROS INTERIORES Y EXTERIORES LATEX 02 M m2 35.37 29.77 1,052.96 0.00 1,052.96 1,052.96
13.01.08.01.03 PINTURA EN SUPERRFICIES DE COLUMNAS LATEX 2 MANOS,I m2 51.26 29.77 1,526.01 0.00 1,526.01 1,526.01
13.01.08.01.04 PINTURA EN SUPERFICIES DE COLUMNAS DE AMARRE LATE m2 4.00 27.36 109.44 0.00 109.44 109.44
13.01.08.01.05 PINTURA EN SUPERFICIES DE VIGAS , LATEX 2 MANOS,INC. m2 39.16 29.77 1,165.79 0.00 1,165.79 1,165.79
13.01.08.01.06 PINTURA EN VESTIDURAS , LATEX 2 MANOS,INC. IMPRIMANTE m2 1.05 32.64 34.27 0.00 34.27 34.27
13.01.08.02 PINTURA ESMALTE 239.48 0.00 239.48 239.48
13.01.08.02.01 PINTURA ESMALTE EN CONTRAZOCALO EXTERIOR. m 15.50 15.45 239.48 0.00 239.48 239.48
14 MUROS DE CONTENCION Y CERCO PERIMETRICO 135,879.64 0.00 135,879.62 16,669.44 12,788.69 106,421.50
14.01 CERCO PERIMETRICO DE ALBAÑILERIA 135,879.64 0.00 135,879.62 16,669.44 12,788.69 106,421.50
14.01.01 MUROS Y TABIQUES DE ALBAÑILERIA 24,404.58 0.00 24,404.58 16,669.44 7,735.14
14.01.01.01 MURO DE SOGA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 284.27 85.85 24,404.58 0.00 24,404.58 16,669.44 7,735.14
14.01.02 REVOQUES Y REVESTIMIENTOS 42,416.09 0.00 42,416.08 5,053.55 37,362.54
14.01.02.01 TARRAJEO EN MUROS EXTERIORES e=1.5 cm, C:A 1:5 m2 711.10 31.98 22,740.98 0.00 22,740.98 5,053.55 17,687.43
14.01.02.02 TARRAJEO EN COLUMNAS e=1.5 cm, C:A 1:5 m2 111.40 34.52 3,845.53 0.00 3,845.53 3,845.53
14.01.02.03 TARRAJEO EN VIGAS e=1.5 cm, C:A 1:5 m2 151.21 40.72 6,157.27 0.00 6,157.27 6,157.27
14.01.02.04 BRUÑAS INTERIORES Y EXTERIORES DE 1 X 1 cm m 1,233.57 6.87 8,474.63 0.00 8,474.63 8,474.63
14.01.02.05 CURADO DE CONCRETO EN TARRAJEO DE MUROS,COLUMNAS Y m2 973.72 1.23 1,197.68 0.00 1,197.68 1,197.68
14.01.03 COBERTURAS 36,608.52 0.00 36,608.52 36,608.52
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
14.01.03.01 CORREAS DE MADERA TORNILLO 50X50mm m 352.04 21.54 7,582.94 0.00 7,582.94 7,582.94
14.01.03.02 COBERTURA CON TEJA ANDINA m2 154.38 80.87 12,484.71 0.00 12,484.71 12,484.71
14.01.03.03 CUMBRERA CON TEJA ANDINA m 229.83 71.97 16,540.87 0.00 16,540.87 16,540.87
14.01.04 CARPINTERIA METALICA 7,054.38 0.00 7,054.38 7,054.38
14.01.04.01 BARANDAS METALICAS DE H=0.90m m 40.99 172.10 7,054.38 0.00 7,054.38 7,054.38
14.01.05 PINTURA 25,396.07 0.00 25,396.07 25,396.06
14.01.05.01 PINTURA LATEX 22,175.38 0.00 22,175.38 22,175.38
14.01.05.01.01 PINTURA DE MUROS EXTERIORES LATEX 02 MANOS INC. IMP m2 482.28 29.77 14,357.48 0.00 14,357.48 14,357.48
14.01.05.01.02 PINTURA EN SUPERRFICIES DE COLUMNAS LATEX 2 MANOS,I m2 111.40 29.77 3,316.38 0.00 3,316.38 3,316.38
14.01.05.01.03 PINTURA EN SUPERFICIES DE VIGAS , LATEX 2 MANOS,INC. m2 151.21 29.77 4,501.52 0.00 4,501.52 4,501.52
14.01.05.02 PINTURA ESMALTE 3,220.69 0.00 3,220.69 3,220.69
14.01.05.02.01 PINTURA ESMALTE EN SARDINELES m2 32.90 14.92 490.87 0.00 490.87 490.87
14.01.05.02.02 PINTURA ESMALTE EN CERCO PERIMETRICO m2 228.82 11.93 2,729.82 0.00 2,729.82 2,729.82
15 MANTENIMIENTO DE PABELLONES EXISTENTES 21,027.14 0.00 21,027.14 8,653.74 12,373.40
15.01 PABELLON 01 8,680.21 0.00 8,680.21 5,227.04 3,453.17
15.01.01 REVOQUES Y REVESTIMIENTOS 148.09 0.00 148.09 148.09
15.01.01.01 TARRAJEO DE PROTECCION PLUVIAL e=1.5 cm, C:A 1:5 m2 4.29 34.52 148.09 0.00 148.09 148.09
15.01.02 PINTURA 3,453.17 0.00 3,453.17 3,453.17
15.01.02.01 PINTURA LATEX 2,679.66 0.00 2,679.66 2,679.66
15.01.02.01.01 PINTURA EN FACHADA EXTERIOR, LATEX 02 MANOS INC. IMP m2 86.13 29.77 2,564.09 0.00 2,564.09 2,564.09
15.01.02.01.02 PINTURA EN FPROTECCION PLUVIAL, LATEX 02 MANOS INC. m2 4.29 26.94 115.57 0.00 115.57 115.57
15.01.02.02 PINTURA ESMALTE 287.99 0.00 287.99 287.99
15.01.02.02.01 PINTURA ESMALTE DE MALLA METALICA EN PUERTAS Y VEN m2 18.64 15.45 287.99 0.00 287.99 287.99
15.01.02.03 SELLADORA Y/O BARNIZ 485.52 0.00 485.52 485.52
15.01.02.03.01 PINTURA BARNIZ EN CARPINTERIA DE MADERA-PUERTAS m2 8.80 21.06 185.33 0.00 185.33 185.33
15.01.02.03.02 PINTURA BARNIZ EN CARPINTERIA DE MADERA-VENTANAS m2 21.26 14.12 300.19 0.00 300.19 300.19
15.01.03 CABLE DE ENERGIA EN TUBERIAS 2,372.10 0.00 2,372.10 2,372.10
15.01.03.01 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 6mm2 m 92.00 7.85 722.20 0.00 722.20 722.20
15.01.03.02 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 4 mm2 m 158.90 6.12 972.47 0.00 972.47 972.47
15.01.03.03 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 2.5 mm2 m 125.45 5.40 677.43 0.00 677.43 677.43
15.01.04 PROTECCION DE TUBERIA PLUVIAL 426.76 0.00 426.77 426.76
15.01.04.01 ENCOFRADO Y DESENCOFRADO m2 3.84 83.73 321.52 0.00 321.52 321.52
15.01.04.02 CONCRETO f'c=175 kg/cm2 m3 0.26 365.05 94.91 0.00 94.91 94.91
15.01.04.03 CURADO DE CONCRETO m2 3.84 2.69 10.33 0.00 10.33 10.33
15.01.05 VEREDAS 2,280.09 0.00 2,280.09 2,280.09
15.01.05.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 5.85 64.42 376.86 0.00 376.86 376.86
15.01.05.02 CONCRETO f'c=175 kg/cm2 m3 4.86 365.05 1,774.14 0.00 1,774.14 1,774.14
15.01.05.03 CURADO DE CONCRETO m2 18.97 2.69 51.03 0.00 51.03 51.03
15.01.05.04 JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION, E=1" m 4.30 10.22 43.95 0.00 43.95 43.95
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
15.01.05.05 JUNTAS ASFALTICAS DE CONTRACCION E=1" m 4.50 7.58 34.11 0.00 34.11 34.11
15.02 PABELLON 02 12,346.93 0.00 12,346.93 3,426.70 8,920.23
15.02.01 REVOQUES Y REVESTIMIENTOS 303.87 0.00 303.87 303.87
15.02.01.01 TARRAJEO EN PROTECCION PLUVIAL e=1.5 cm, C:A 1:5 m2 4.29 34.52 148.09 0.00 148.09 148.09
15.02.01.02 TARRAJEO EN MUROS INTERIORES e=1.5 cm, C:A 1:5 m2 5.74 27.14 155.78 0.00 155.78 155.78
15.02.02 PISOS Y PAVIMENTOS 2,143.88 0.00 2,143.88 2,143.88
15.02.02.01 PISOS 2,143.88 0.00 2,143.88 2,143.88
15.02.02.01.01 PISO CERAMICO DE ALTO TRANSITO 0.45X0.45m m2 27.11 65.89 1,786.28 0.00 1,786.28 1,786.28
15.02.02.01.02 PISO CERAMICO 0.25X0.40M m2 5.74 62.30 357.60 0.00 357.60 357.60
15.02.03 ZOCALOS Y CONTRAZOCALOS 673.94 0.00 673.94 673.94
15.02.03.01 ZOCALOS 673.94 0.00 673.94 673.94
15.02.03.01.01 ZOCALO DE CERAMICO DE 0.25 X 0.40M H=2.18M m2 11.07 60.88 673.94 0.00 673.94 673.94
15.02.04 CERRAJERIA 126.16 0.00 126.16 126.16
15.02.04.01 CERRADURA PARA PUERTAS und 1.00 126.16 126.16 0.00 126.16 126.16
15.02.05 PINTURA 3,632.04 0.00 3,632.04 3,632.04
15.02.05.01 PINTURA LATEX 2,933.30 0.00 2,933.30 2,933.30
15.02.05.01.01 PINTURA EN FACHADA EXTERIOR, LATEX 02 MANOS INC. IMP m2 94.65 29.77 2,817.73 0.00 2,817.73 2,817.73
15.02.05.01.02 PINTURA EN PROTECCION PLUVIAL , LATEX 2 MANOS,INC. IM m2 4.29 26.94 115.57 0.00 115.57 115.57
15.02.05.02 SELLADORA Y/O BARNIZ 698.74 0.00 698.74 698.74
15.02.05.02.01 PINTURA BARNIZ EN CARPINTERIA DE MADERA-PUERTAS m2 20.52 21.06 432.15 0.00 432.15 432.15
15.02.05.02.02 PINTURA BARNIZ EN CARPINTERIA DE MADERA-VENTANAS m2 18.88 14.12 266.59 0.00 266.59 266.59
15.02.06 CABLE DE ENERGIA EN TUBERIAS 1,901.42 0.00 1,901.42 1,901.42
15.02.06.01 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 6mm2 m 25.90 7.85 203.32 0.00 203.32 203.32
15.02.06.02 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 4 mm2 m 184.60 6.12 1,129.75 0.00 1,129.75 1,129.75
15.02.06.03 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 2.5 mm2 m 105.25 5.40 568.35 0.00 568.35 568.35
15.02.07 ESTRUCTURA PARA LAVATORIOS 633.31 0.00 633.31 494.39 138.92
15.02.07.01 MURO DE SOGA CON LADRILLO K.K 18 HUECOS C:A 1:4 m2 3.90 85.85 334.82 0.00 334.82 334.82
15.02.07.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 25.45 6.27 159.57 0.00 159.57 159.57
15.02.07.03 ENCOFRADO Y DESENCOFRADO m2 0.52 83.73 43.54 0.00 43.54 43.54
15.02.07.04 CONCRETO f'c=175 kg/cm2 m3 0.24 365.05 87.61 0.00 87.61 87.61
15.02.07.05 CURADO DE CONCRETO m2 2.89 2.69 7.77 0.00 7.77 7.77
15.02.08 PROTECCION DE TUBERIA PLUVIAL 426.76 0.00 426.77 426.76
15.02.08.01 ENCOFRADO Y DESENCOFRADO m2 3.84 83.73 321.52 0.00 321.52 321.52
15.02.08.02 CONCRETO f'c=175 kg/cm2 m3 0.26 365.05 94.91 0.00 94.91 94.91
15.02.08.03 CURADO DE CONCRETO m2 3.84 2.69 10.33 0.00 10.33 10.33
15.02.09 VEREDAS 2,505.55 0.00 2,505.54 2,505.55
15.02.09.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 7.65 64.42 492.81 0.00 492.81 492.81
15.02.09.02 CONCRETO f'c=175 kg/cm2 m3 5.10 365.05 1,861.76 0.00 1,861.76 1,861.76
15.02.09.03 CURADO DE CONCRETO m2 25.49 2.69 68.57 0.00 68.57 68.57
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
15.02.09.04 JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION, E=1" m 4.80 10.22 49.06 0.00 49.06 49.06
15.02.09.05 JUNTAS ASFALTICAS DE CONTRACCION E=1" m 4.40 7.58 33.35 0.00 33.35 33.35
16 OTROS 71,528.34 31,623.68 39,904.67 9,388.27 9,085.42 21,430.98
16.01 JARDINERIA 10,675.20 0.00 10,675.20 10,675.20
16.01.01 SIEMBRA DE GRASS m2 202.72 36.06 7,310.08 0.00 7,310.08 7,310.08
16.01.02 PLANTACION DE PLANTAS ORNAMENTALES und 16.00 75.07 1,201.12 0.00 1,201.12 1,201.12
16.01.03 PLANTACION DE FLORES ORNAMENTALES und 200.00 10.82 2,164.00 0.00 2,164.00 2,164.00
16.02 SEÑALIZACION 2,578.89 0.00 2,578.89 2,578.89
16.02.01 SEÑALETICA DE VINIL AUTOADHESIVO DE 0.30X0.20M und 47.00 54.87 2,578.89 0.00 2,578.89 2,578.89
16.03 LIMPIEZA 2,847.75 1,139.10 1,708.65 601.91 582.49 524.24
16.03.01 LIMPIEZA PERMANENTE MENSUAL DE OBRA mes 3.00 569.55 2,847.75 1,139.10 1,708.65 601.91 582.49 524.24
16.04 FLETE TERRESTRE 55,426.50 30,484.58 24,941.93 8,786.36 8,502.93 7,652.64
16.04.01 FLETE TERRESTRE glb 0.45 55,426.50 55,426.50 30,484.58 24,941.93 8,786.36 8,502.93 7,652.64
17 INSTALACIONES SANITARIAS 28,382.52 0.00 28,382.51 3,705.57 14,492.56 10,184.39
17.01 OBRAS CIVILES EN INSTALACIONES SANITARIAS 7,156.75 0.00 7,156.75 3,226.07 3,930.68
17.01.01 MOVIMIENTO DE TIERRAS 3,117.16 0.00 3,117.16 2,758.32 358.84
17.01.01.01 EXCAVACION DE ZANJAS PARA TENDIDO DE TUBERIA DE AGUA m3 4.54 47.46 215.47 0.00 215.47 215.47
17.01.01.02 EXCAVACION DE ZANJAS PARA TENDIDO DE TUBERIA DE DESA m3 2.50 47.46 118.65 0.00 118.65 118.65
17.01.01.03 EXCAVACION DE ZANJAS PARA CANAL DE DRENAJE PLUVIAL m3 23.28 47.46 1,104.87 0.00 1,104.87 883.90 220.97
17.01.01.04 EXCAVACION DE ZANJAS PARA TUBERIA DE DRENAJE PLUVIAL m3 5.81 47.46 275.74 0.00 275.74 137.87 137.87
17.01.01.05 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 12.02 32.95 396.06 0.00 396.06 396.06
17.01.01.06 ACARREO DE MATERIAL EXCEDENTE HASTA DP=30M. m3 30.14 17.80 536.49 0.00 536.49 536.49
17.01.01.07 ELIMINACION DE MATERIAL EXCEDENTE m3 30.14 15.59 469.88 0.00 469.88 469.88
17.01.02 OBRAS DE CONCRETO SIMPLE 4,039.59 0.00 4,039.59 467.76 3,571.84
17.01.02.01 CAJA DE REGISTRO PARA DESAGUE DE 12"X24" und 2.00 233.88 467.76 0.00 467.76 467.76
17.01.02.02 CAJA DE REUNION PARA DESAGUE DE 24"X24" und 4.00 265.46 1,061.84 0.00 1,061.84 1,061.84
17.01.02.03 CAJA DE REUNION PARA DRENAJE PLUVIAL DE 12"X24" und 2.00 233.88 467.76 0.00 467.76 467.76
17.01.02.04 CAJA PREFABRICADA PARA VALVULA EN PISO Y TAPA METALIC und 2.00 151.51 303.02 0.00 303.02 303.02
17.01.02.05 PROTECCION DE TUBERIA DE BAJADA DE DRENAJE PLUVIAL EN und 11.00 158.11 1,739.21 0.00 1,739.21 1,739.21
17.02 APARATOS SANITARIOS 1,735.14 0.00 1,735.14 1,735.14
17.02.01 LAVATORIO OVALIN SONNET O SIMILAR und 6.00 244.07 1,464.42 0.00 1,464.42 1,464.42
17.02.02 COLOCACION DE APARATOS SANITARIO pza 6.00 45.12 270.72 0.00 270.72 270.72
17.03 SISTEMA DE AGUA FRIA 9,169.43 0.00 9,169.43 720.18 8,449.25
17.03.01 SALIDAS DE AGUA FRIA 181.50 0.00 181.50 181.50
17.03.01.01 SALIDA DE AGUA FRIA DE 1/2" pto 3.00 60.50 181.50 0.00 181.50 181.50
17.03.02 REDES DE DISTRIBUCION 1,440.35 0.00 1,440.35 720.18 720.18
17.03.02.01 TUBERIA DE PVC CLASE 10 DE 1/2" m 34.30 16.80 576.24 0.00 576.24 288.12 288.12
17.03.02.02 TUBERIA DE PVC CLASE 10 DE 3/4" m 44.45 19.44 864.11 0.00 864.11 432.06 432.06
17.03.03 VALVULAS 348.86 0.00 348.86 348.86
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
17.03.03.01 VALVULA ESFERICA DE BRONCE DE 1/2" und 1.00 78.88 78.88 0.00 78.88 78.88
17.03.03.02 VALVULA ESFERICA DE BRONCE DE 3/4" und 1.00 101.26 101.26 0.00 101.26 101.26
17.03.03.03 GRIFO DE RIEGO ESFERICO DE BRONCE DE 1/2" und 3.00 56.24 168.72 0.00 168.72 168.72
17.03.04 EQUIPOS Y ACCESORIOS DE BOMBEO DE PRESION CONSTANTE 3,663.63 0.00 3,663.63 3,663.63
17.03.04.01 TUBERIA DE SUCCION PVC 2" m 3.80 62.25 236.55 0.00 236.55 236.55
17.03.04.02 VALVULA DE PIE DE 2" CON CANASTILLA und 2.00 151.90 303.80 0.00 303.80 303.80
17.03.04.03 TUBERIA DE IMPULSION PVC 1 1/2" m 2.10 62.06 130.33 0.00 130.33 130.33
17.03.04.04 TUBERIA DE IMPULSION FIERRO GALVANIZADO 1 1/ 2" m 11.61 104.28 1,210.69 0.00 1,210.69 1,210.69
17.03.04.05 VALVULA CHECK DE BRONCE DE 1 1/2" und 2.00 296.92 593.84 0.00 593.84 593.84
17.03.04.06 VALVULA COMPUERTA DE BRONCE DE 1½" und 4.00 241.83 967.32 0.00 967.32 967.32
17.03.04.07 CODO PVC DE 90° DE 1 1/2" und 3.00 16.25 48.75 0.00 48.75 48.75
17.03.04.08 CODO PVC DE 90° DE 2" und 2.00 20.48 40.96 0.00 40.96 40.96
17.03.04.09 CODO FIERRO GALVANIZADO DE 90° DE 1 1/2" und 1.00 27.59 27.59 0.00 27.59 27.59
17.03.04.10 TEE PVC DE 1 1/2" und 1.00 20.48 20.48 0.00 20.48 20.48
17.03.04.11 UNION PVC DE 1 1/2" CON ROSCA und 1.00 18.46 18.46 0.00 18.46 18.46
17.03.04.12 UNION UNIVERSAL PVC DE 2" und 2.00 32.43 64.86 0.00 64.86 64.86
17.03.05 PRUEBAS HIDRAULICA DE TUBERIA DE AGUA FRIA 148.39 0.00 148.39 148.40
17.03.05.01 PRUEBA HIDRAULICA PARA TUBERIA DE SUCCION PVC 2" m 3.80 3.00 11.40 0.00 11.40 11.40
17.03.05.02 PRUEBA HIDRAULICA PARA TUBERIA DE IMPULSION PVC 1 1/2" m 2.10 2.26 4.75 0.00 4.75 4.75
17.03.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE PVC CLASE 10 DE 1/2" m 34.30 1.51 51.79 0.00 51.79 51.79
17.03.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE PVC CLASE 10 DE 3/4" m 44.45 1.81 80.45 0.00 80.45 80.45
17.03.06 ALMACENAMIENTO DE AGUA Y OTRAS INSTALACIONES 3,386.70 0.00 3,386.71 3,386.69
17.03.06.01 ACCESORIO DE TANQUE ELEVADO 3,150.90 0.00 3,150.90 3,150.89
17.03.06.01.01 TUBERIA DE REBOSE Y LIMPIEZA FIERRO GALVANIZADO DE 2" m 13.75 104.14 1,431.93 0.00 1,431.93 1,431.93
17.03.06.01.02 CODO FIERRO GALVANIZADO DE 90° DE 2" und 3.00 32.67 98.01 0.00 98.01 98.01
17.03.06.01.03 TEE FIERRO GALVANIZADO DE 2" und 2.00 36.91 73.82 0.00 73.82 73.82
17.03.06.01.04 TUBERIA DE ALIMENTACION DE FIERRO GALVANIZADO DE 3/4" m 10.32 145.26 1,499.08 0.00 1,499.08 1,499.08
17.03.06.01.05 CODO FIERRO GALVANIZADO DE 90° DE 3/4" und 3.00 16.02 48.06 0.00 48.06 48.06
17.03.06.02 ACCESORIO DE LA CISTERNA 235.80 0.00 235.81 235.80
17.03.06.02.01 TUBERIA DE LIMPIEZA PVC DE 4" m 2.74 24.18 66.25 0.00 66.25 66.25
17.03.06.02.02 CODO PVC DE 90° DE 4" und 2.00 18.88 37.76 0.00 37.76 37.76
17.03.06.02.03 TUBERIA DE PVC CLASE 10 DE 3/4" m 1.10 19.44 21.38 0.00 21.38 21.38
17.03.06.02.04 KIT COMPLETO DE VALVULA FLOTADORA DE 3/4" glb 1.00 110.41 110.41 0.00 110.41 110.41
17.04 SISTEMA DE DRENAJE PLUVIAL 9,841.70 0.00 9,841.69 9,841.70
17.04.01 RED DE RECOLECCION 9,443.24 0.00 9,443.24 9,443.24
17.04.01.01 TUBERIA PVC DE 4" m 67.75 25.32 1,715.43 0.00 1,715.43 1,715.43
17.04.01.02 TUBERIA PVC DE 8" m 28.38 60.16 1,707.34 0.00 1,707.34 1,707.34
17.04.01.03 CANALETA DE PLANCHA DE F°G° DE 6" m 91.58 65.74 6,020.47 0.00 6,020.47 6,020.47
17.04.02 PRUEBAS HIDRAULICA PARA TUBERIAS DE DRENAJE PLUVIAL 398.46 0.00 398.45 398.46
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
17.04.02.01 PRUEBA HIDRAULICA PARA TUBERIA PVC DE 4" m 67.75 3.46 234.42 0.00 234.42 234.42
17.04.02.02 PRUEBA HIDRAULICA PARA TUBERIA PVC DE 8" m 28.38 5.78 164.04 0.00 164.04 164.04
17.05 SISTEMA DE DRENAJE Y VENTILACION 479.50 0.00 479.49 479.50
17.05.01 REDES DE DERIVACION 432.96 0.00 432.96 432.96
17.05.01.01 TUBERIA PVC SAP DE 4" m 13.45 32.19 432.96 0.00 432.96 432.96
17.05.02 PRUEBAS HIDRAULICA PARA TUBERIAS DE DESAGUE 46.54 0.00 46.54 46.54
17.05.02.01 PRUEBA HIDRAULICA PARA TUBERIA PVC SAP DE 4" m 13.45 3.46 46.54 0.00 46.54 46.54
18 INSTALACIONES ELECTRICAS 69,870.50 0.00 69,870.49 13,537.38 48,922.65 7,410.47
18.01 SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEÑALES DEBILES 43,519.70 0.00 43,519.69 13,537.38 29,982.32
18.01.01 SALIDAS 9,301.90 0.00 9,301.90 1,719.39 7,582.52
18.01.01.01 SALIDA PARA LUMINARIAS pto 51.00 50.57 2,579.07 0.00 2,579.07 1,719.38 859.69
18.01.01.02 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 12.00 60.74 728.88 0.00 728.88 728.88
18.01.01.03 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 5.00 64.13 320.65 0.00 320.65 320.65
18.01.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE pto 5.00 105.10 525.50 0.00 525.50 525.50
18.01.01.05 SALIDA PARA INTERRUPTOR DE TRES VIAS O CONMUTACION pto 6.00 62.43 374.58 0.00 374.58 374.58
18.01.01.06 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A pto 42.00 69.21 2,906.82 0.00 2,906.82 2,906.82
18.01.01.07 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A pto 4.00 114.13 456.52 0.00 456.52 456.52
18.01.01.08 SALIDA PARA CAJA DE PASO RECTANGULAR 100X50mm pto 6.00 40.56 243.36 0.00 243.36 243.36
18.01.01.09 SALIDA PARA LUZ DE EMERGENCIA pto 12.00 77.52 930.24 0.00 930.24 930.24
18.01.01.10 SALIDA PARA PULSADOR DE TIMBRE pto 1.00 61.59 61.59 0.00 61.59 61.59
18.01.01.11 SALIDA PARA TIMBRE CAMPANA EXTERIOR pto 1.00 61.00 61.00 0.00 61.00 61.00
18.01.01.12 SALIDA PARA RADIO CENTRAL pto 1.00 52.69 52.69 0.00 52.69 52.69
18.01.01.13 SALIDA PARA BOCINA EXTERIOR pto 1.00 61.00 61.00 0.00 61.00 61.00
18.01.02 TUBERIAS 6,959.00 0.00 6,959.00 4,246.79 2,712.22
18.01.02.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP Ø=40mm. m 191.38 12.44 2,380.77 0.00 2,380.77 2,380.77
18.01.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP Ø=25mm. m 26.20 9.11 238.68 0.00 238.68 238.68
18.01.02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP Ø=20mm. m 580.93 7.47 4,339.55 0.00 4,339.55 1,627.33 2,712.22
18.01.03 CABLES DE ENERGIA EN TUBERIAS 19,518.36 0.00 19,518.36 5,444.75 14,073.60
18.01.03.01 SUMINISTRO E INSTALACION DE CABLE N2XOH DE 25 mm2 m 4.00 24.53 98.12 0.00 98.12 98.12
18.01.03.02 SUMINISTRO E INSTALACION DE CABLE N2XOH DE 16 mm2 m 57.60 16.79 967.10 0.00 967.10 967.10
18.01.03.03 SUMINISTRO E INSTALACION DE CABLE N2XOH DE 10mm2 m 72.40 12.76 923.82 0.00 923.82 923.82
18.01.03.04 SUMINISTRO E INSTALACION DE CABLE N2XOH DE 6mm2 m 94.46 10.08 952.16 0.00 952.16 952.16
18.01.03.05 SUMINISTRO E INSTALACION DE CABLE N2XOH DE 4mm2 m 47.60 8.80 418.88 0.00 418.88 418.88
18.01.03.06 SUMINISTRO E INSTALACION DE CABLE N2XOH DE 2.5mm2 m 39.03 7.90 308.34 0.00 308.34 308.34
18.01.03.07 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 6mm2 m 714.60 7.85 5,609.61 0.00 5,609.61 701.20 4,908.41
18.01.03.08 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 4 mm2 m 921.80 6.12 5,641.42 0.00 5,641.42 564.14 5,077.28
18.01.03.09 SUMINISTRO E INSTALACION DE CABLE NH-80 DE 2.5 mm2 m 851.65 5.40 4,598.91 0.00 4,598.91 510.99 4,087.92
18.01.04 SISTEMA DE CONDUCTOS 2,126.45 0.00 2,126.45 2,126.45
18.01.04.01 BUZON DE CONCRETO CON TAPA 0.30X0.30X0.40M und 4.00 114.78 459.12 0.00 459.12 459.12
CALENDARIO VALORIZADO DE AVANCE DE OBRA
OBRA : “REHABILITACION DEL LOCAL DE LA INSTITUCION EDUCATIVA N°243 SANTA CLARA DE ASIS-NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE,
PROVEINCIA DE HUAYLAS, REGION ANCASH”
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
18.01.04.02 EXCAVACION DE ZANJA 0.30X0.50M PARA CABLEADO EXTERIOR m3 20.80 47.46 987.17 0.00 987.17 987.17
18.01.04.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 20.80 32.70 680.16 0.00 680.16 680.16
18.01.05 TABLEROS DE CONTROL 2,894.88 0.00 2,894.88 2,894.88
18.01.05.01 TABLERO GENERAL und 1.00 475.17 475.17 0.00 475.17 475.17
18.01.05.02 TABLERO DE DISTRIBUCION und 5.00 381.95 1,909.75 0.00 1,909.75 1,909.75
18.01.05.03 TABLERO DE CONTROL DE MANDO ELECTROBOMBA und 1.00 509.96 509.96 0.00 509.96 509.96
18.01.06 DISPOSITIVO DE MANIOBRA Y PROTECCION 2,719.11 0.00 2,719.11 2,719.11
18.01.06.01 INTERRUPTOR DIFERENCIAL 2X40A-30mA L und 1.00 176.74 176.74 0.00 176.74 176.74
18.01.06.02 INTERRUPTOR DIFERENCIAL 2X25A-30mA und 5.00 121.65 608.25 0.00 608.25 608.25
18.01.06.03 INTERRUPTOR DIFERENCIAL 2X20A-30mA und 5.00 121.65 608.25 0.00 608.25 608.25
18.01.06.04 INTERRUPTOR AUTOMATICO TERMOMAGNETICO ENGRAMPE 2X4und 1.00 83.52 83.52 0.00 83.52 83.52
18.01.06.05 INTERRUPTOR AUTOMATICO TERMOMAGNETICO ENGRAMPE 2X3und 5.00 75.04 375.20 0.00 375.20 375.20
18.01.06.06 INTERRUPTOR AUTOMATICO TERMOMAGNETICO ENGRAMPE 2X2und 5.00 62.33 311.65 0.00 311.65 311.65
18.01.06.07 INTERRUPTOR AUTOMATICO TERMOMAGNETICO ENGRAMPE 2X1und 10.00 55.55 555.50 0.00 555.50 555.50
18.02 INSTALACION DE SISTEMA DE PUESTA A TIERRA 5,306.08 0.00 5,306.08 5,306.08
18.02.01 INSTALACION DE POZO PUESTA A TIERRA und 4.00 1,326.52 5,306.08 0.00 5,306.08 5,306.08
18.03 ARTEFACTOS 15,403.89 0.00 15,403.89 13,634.24 1,769.64
18.03.01 LUMINARIAS 55.00 13,654.34 0.00 13,654.34 11,884.69 1,769.64
18.03.01.01 LUMINARIA CON LAMPARA LED DOBLE DE 2X18W, REJILLA D und 47.00 188.26 8,848.22 0.00 8,848.22 7,078.57 1,769.64
18.03.01.02 LUMINARIA CON LAMPARA LED DE 18W, INC. ACCESORIOS DE und 4.00 97.57 390.28 0.00 390.28 390.28
18.03.01.03 REFLECTOR LED RECTANGULAR 250W und 4.00 1,103.96 4,415.84 0.00 4,415.84 4,415.84
18.03.02 LUCES DE EMERGENCIA 11.00 1,749.55 0.00 1,749.55 1,749.55
18.03.02.01 ARTEFACTO DE ILUMINACION DE EMERGENCIA CON DOS LAMP und 11.00 159.05 1,749.55 0.00 1,749.55 1,749.55
18.04 ALTAVOCES Y TIMBRES 2.00 1,363.03 0.00 1,363.03 1,363.03
18.04.01 ALTAVOCES und 1.00 1,263.31 1,263.31 0.00 1,263.31 1,263.31
18.04.02 TIMBRES und 1.00 99.72 99.72 0.00 99.72 99.72
18.05 EQUIPOS ELECTRICOS Y MECANICOS 3.00 4,277.80 0.00 4,277.80 4,277.80
18.05.01 ELECTROBOMBA CENTRIFUGA DE AGUA 1HP und 2.00 1,058.39 2,116.78 0.00 2,116.78 2,116.78
18.05.02 PRUEBAS ELECTRICAS glb 1.00 2,161.02 2,161.02 0.00 2,161.02 2,161.02
FECHA: Oct-22
PROGRAMACION ACELERADO
TOTAL TOTAL
Item Descripción Und. Metrado P. Unit. (S/.) PRESUPUESTADO EJECUTADO
val 03 val 04 val 05
(S/.) (S/.) TOTAL S/.
01-31 Octubre 01-30 Nov. 01-28 Dic
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
PRESUPUESTO
AVANCE MENSUAL
AVANCE ACUMULADO
DE MOVILIARIO Y EQUIPAMENTO
243 SANTA CLARA DE ASÍS – NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA,
E PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
ARTAMENTO DE ANCASH
IO Y EQUIPAMENTO
243 SANTA CLARA DE ASÍS – NIVEL INICIAL, CENTRO POBLADO DE CATUCANCHA,
E PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
ARTAMENTO DE ANCASH
PROYECTO: "REHABILITACIÓN DEL LOCAL DE LA INSTITUCIÓN EDUCATIVA N° 243 SANTA CLARA DE ASÍS – NIVEL INICIAL, CEN
DISTRITO PUEBLO LIBRE, DE PROVINCIA DE HUAYLAS, REGIÓN ANCASH"
UBICACIÓN: CP. CATUCANCHA, DISTRITO DE PUEBLO LIBRE, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
PRESUPUESTO
AVANCE MENSUAL
AVANCE ACUMULADO
DE PLAN DE CONTINGENCIA
MENTO DE ANCASH
5,000.00 5,000.00
2,000.00 2,000.00
1,200.00 1,200.00
7,400.00 7,400.00
4,800.00 4,800.00
1,600.00 1,600.00
1,000.00 1,000.00
Presupuesto base
(CD) S/1,920,352.26
===============
PRESUPUESTO DE INFRAESTRUCTURA 2,673,898.49
PRESUPUESTO DE MOVILIARIO Y EQUIPAMIENTO 157,738.36
PRESUPUESTO DE PLAN DE CONTINGENCIA 19,600.00
===============
MONTO TOTAL DE LA OFERTA 2,851,236.85
Nota : Los precios de los recursos no incluyen I.G.V. son vigentes al : 7/5/2022