Está en la página 1de 6

CRONOGRAMA DE INSUMOS REQUERIDOS

“MEJORAMIENTO DEL SERVICIO DEPORTIVO Y RECREATIVO DEL CENTRO POBLADO DE SAN ANTONIO BAJO,
Obra
DISTRITO DE BAMBAMARCA, PROVINCIA HUALGAYOC, DEPARTAMENTO CAJAMARCA."

Fecha Aug-21
Lugar CAJAMARCA - HUALGAYOC - BAMBAMARCA- SAN ANTONIO
Recurso Unidad Cantidad Precio S/. Parcial S/. 1° MES 2° MES TOTAL

37.26% 62.74%
MANO DE OBRA
TOPOGRAFO hh 9.2938 26.42 245.54 91.49 154.05 245.54
OPERARIO hh 963.4641 23.44 22,583.60 8,415.22 14,168.38 22,583.60
OFICIAL hh 674.5929 18.53 12,500.21 4,657.89 7,842.31 12,500.21
PEON hh 2,434.8704 16.76 40,808.43 15,206.26 25,602.17 40,808.43
76,137.77 76,137.77
MATERIALES
ALAMBRE NEGRO RECOCIDO # 16 kg 47.8932 4.03 192.91 71.88 121.03 192.91
ALAMBRE NEGRO RECOCIDO # 8 kg 327.4740 4.03 1,319.07 491.52 827.55 1,319.07
CLAVOS PARA MADERA CON CABEZA DE 3" kg 156.5835 4.03 630.72 235.02 395.70 630.72
TUBO CUADRADO DE ACERO 3/4" X 3/4" X 1.8MM x L=6m Und 36.3498 20.12 731.39 272.54 458.86 731.39
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 486.4335 3.75 1,825.34 680.17 1,145.17 1,825.34
ARENA FINA m3 6.3362 70.00 443.53 165.27 278.26 443.53
PIEDRA CHANCADA DE 1/2" m3 152.8060 60.00 9,168.36 3,416.36 5,752.00 9,168.36
PIEDRA GRANDE DE 8" m3 188.0803 40.00 7,523.21 2,803.34 4,719.87 7,523.21
PIEDRA OVER DE 4" m3 59.4667 40.00 2,378.67 886.35 1,492.32 2,378.67
AFIRMADO m3 78.1763 30.00 2,345.29 873.91 1,471.37 2,345.29
ARENA GRUESA m3 55.4599 70.00 3,882.19 1,446.60 2,435.59 3,882.19
TABLERO ELECTRICO METAL - 8 POLOS Und 1.0000 20.13 20.13 7.50 12.63 20.13
LLAVE TERMOMAGNETICA 2X20A Und 1.0000 32.21 32.21 12.00 20.20 32.21
LLAVE TERMOMAGNETICA 2X16A Und 1.0000 32.21 32.21 12.00 20.20 32.21
ASFALTO RC-250 gal 45.0338 15.30 688.79 256.66 432.13 688.79
LADRILLO KING KONG DE ARCILLA 9 X 12.5 X 24 cm Und 232.5000 0.52 121.48 45.27 76.21 121.48
CABLE ELECTRICO NYY 2 X 6 mm2 m 10.5000 7.25 76.11 28.36 47.75 76.11
CEMENTO PORTLAND TIPO I (42.5 kg) bls 2,808.3129 19.50 54,762.10 20,405.75 34,356.35 54,762.10
MALLA CERCADORA NARANJA rll 1.0000 36.23 36.23 13.50 22.73 36.23
CINTA DE SEÑALIZACION 400M COLOR ROJO rll 1.0000 24.15 24.15 9.00 15.15 24.15
YESO DE 28 Kg bls 87.7298 7.25 635.91 236.96 398.95 635.91
PEGAMENTO PARA PVC 1/4 gl Und 2.2712 24.15 54.85 20.44 34.41 54.85
SOLDADURA CELLOCORD P 3/16" kg 124.0356 11.27 1,397.51 520.75 876.76 1,397.51
MANGUERA HDPE SAP Ø 3/4" C-10 m 150.0000 0.88 132.53 49.38 83.14 132.53
ASPERSOR NAAN 427 DE 3.2 MM Und 6.0000 28.18 169.06 63.00 106.07 169.06
CINTA TEFLON Und 4.0000 0.81 3.23 1.20 2.03 3.23
BANDERIN DE TUBO PVC/C-10 Ø3.5cm L=150cm (133cm DE TUBO + 17cm DE Und 6.0000 201.27 1,207.60 449.98 757.62 1,207.60
ESPIRAL)
CORTADORA DE CÉSPED 3.5HP 20" 3 POSICIONES Und 1.0000 603.81 603.81 225.00 378.82 603.81
FLETE TERRESTRE glb 1.0000 13,735.10 13,336.11 4,969.37 8,366.74 13,336.11
CAPACITACIÓN EN GESTIÓN, OPERACIÓN Y MANTENIMIENTO DEL CAMPO glb 1.0000 2,012.71 2,012.71 749.99 1,262.72 2,012.71
DEPORTIVO
TRAMITE Y GESTIÓN PARA OBTENER EL SERVICIO DEL SUMINISTRO glb 1.0000 402.54 402.54 150.00 252.55 402.54
ELECTRICO
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA , EQUIPOS Y glb 1.0000 805.08 805.08 299.99 505.09 805.08
HERRAMIENTAS
GASOLINA 84 OCTANOS gal 21.5732 10.47 225.85 84.16 141.69 225.85
HORMIGON m3 439.4580 64.41 28,305.49 10,547.35 17,758.14 28,305.49
ALQUILER DE LOCAL PARA ALMACEN mes 2.0000 201.27 402.53 149.99 252.54 402.53
AGUA m3 92.9069 4.75 441.31 164.44 276.87 441.31
IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN COVID-19 EN OBRA glb 1.0000 9,056.53 9,056.53 3,374.69 5,681.84 9,056.53
PLANCHA DE TECNOPOR 1" x 1.20 mt x 2.40 mt pl 48.7954 13.69 667.98 248.91 419.08 667.98
TAPA METALICA DE 45 X 45 cm x 1/8" Und 2.0000 64.40 128.80 47.99 80.81 128.80
TAPA METALICA DE 40 X 40 cm x 1/8" Und 6.0000 56.35 338.12 125.99 212.13 338.12
MADERA TORNILLO p2 3,502.1648 4.83 16,901.45 6,297.91 10,603.54 16,901.45
MADERA EUCALIPTO (p2) p2 47.2500 2.82 133.32 49.68 83.64 133.32
MADERA DE EUCALIPTO ROLLIZO 2"x1.5m pza 20.0000 6.44 128.82 48.00 80.82 128.82
ESTACA DE MADERA EUCALIPTO p2 13.3252 3.21 42.79 15.94 26.84 42.79
MALLA OLIMPICA DE F°G° N°10 COCADA 2" X 2" m2 678.0587 24.15 16,374.44 6,101.53 10,272.91 16,374.44
TAPA CON MARCO FIERRO FUNDIDO 10" X 20" pza 1.0000 32.21 32.21 12.00 20.20 32.21
ANGULO 6m x 1-1/2" x 1-1/2" x 1/8 pulg pza 247.4094 20.13 4,980.47 1,855.85 3,124.62 4,980.47
REJILLA METÁLICA EN PLATINA DE 1 1/4"X1/8" (INC. COLOCACIÓN) m 288.4600 80.51 23,224.64 8,654.09 14,570.55 23,224.64
PINTURA ESMALTE SINTETICO 1/4 gl Und 0.8443 11.27 9.51 3.54 5.97 9.51
TANQUE CISTERNA DE AGUA DE 5000L INC ACCESORIOS Und 2.0000 2,576.27 5,152.53 1,919.97 3,232.57 5,152.53
IMPRESION BANNER m2 8.6500 23.08 199.60 74.38 125.23 199.60
UNION UNIVERSAL DE 1/2" Und 4.0000 2.41 9.65 3.60 6.06 9.65
NIPLE DE F° GALV. DE 3/4" X 2" Und 12.0000 2.25 27.02 10.07 16.95 27.02
TUBO DE FIERRO GALVANIZADO DE 2" X L=6M, E=2MM Und 169.9080 78.90 13,405.32 4,995.16 8,410.15 13,405.32
TUBO CUADRADO DE 1" X 1" L=6M, E=2MM Und 54.8380 22.53 1,235.72 460.46 775.26 1,235.72
ABRAZADERA DE FIERRO GALVANIZADO DE 3/4" Und 6.0000 4.96 29.75 11.09 18.67 29.75
TUBERIA PVC SAP PRESION C-10 C/R. 1/2" X 5m Und 17.2515 8.05 138.81 51.73 87.09 138.81
TUBERIA PVC SAP PRESION C-10 C/R. 3/4" X 5m Und 1.2000 11.27 13.52 5.04 8.48 13.52
TUBERIA PVC SAP PRESION C-10 C/R 1" X 5m Und 66.9960 16.10 1,078.80 401.99 676.81 1,078.80
CODO PVC SAP PARA AGUA CON ROSCA DE 3/4" X 90° Und 6.0000 2.01 12.08 4.50 7.58 12.08
CODO PVC SAP PARA AGUA DE 1" X 90° Und 5.0000 2.82 14.11 5.26 8.85 14.11
CODO CACHIMBA PVC SAP 3/4" X 90° Und 6.0000 2.01 12.08 4.50 7.58 12.08
TEE PVC SAP PARA AGUA SIMPLE PRESION DE 1" Und 7.0000 2.82 19.75 7.36 12.39 19.75
TUBERIA PVC SAL DE 250MM X 6M PARA DESAGUE m 16.0000 19.32 309.17 115.20 193.96 309.17
ADAPTADOR PVC SAP 1/2" Und 4.0000 0.81 3.23 1.20 2.03 3.23
TUBERIA PVC SAL 2" m 28.8750 2.66 76.81 28.62 48.19 76.81
TUBERIA DE POLIETILENO DE ALTA DENSIDAD (HDPE) CORRUGADA m 187.1835 20.13 3,768.10 1,404.09 2,364.01 3,768.10
PERFORADA DE 4"
VALVULA COMPUERTA DE BRONCE DE 1/2" Und 2.0000 12.07 24.15 9.00 15.15 24.15
VALVULA COMPUERTA DE BRONCE DE 3/4" Und 6.0000 16.10 96.62 36.00 60.61 96.62
234,016.12 234,016.12

EQUIPOS
HERRAMIENTAS MANUALES %MO 2,350.00 875.67 1,474.33 2,350.00
CASCO DE PROTECCIÒN Und 20.0000 7.24 144.78 53.95 90.83 144.78
ZAPATOS DE SEGURIDAD PUNTA DE ACERO par 20.0000 30.59 611.80 227.97 383.83 611.80
GUANTES DE CUERO par 20.0000 8.05 160.93 59.97 100.96 160.93
RESPIRADOR CONTRA POLVO Und 10.0000 16.10 161.03 60.00 101.02 161.03
LENTES DE PROTECCION Und 20.0000 6.44 128.82 48.00 80.82 128.82
CHALECO DE PROTECCIÒN Und 20.0000 17.71 354.16 131.97 222.19 354.16
CAMION VOLQUETE DE 10 m3 hm 12.2595 96.61 1,184.34 441.31 743.02 1,184.34
MAQUINA DE SOLDAR 350 A hm 64.0586 8.05 515.45 192.07 323.38 515.45
COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP hm 134.2300 9.65 1,295.59 482.77 812.82 1,295.59
RETROEXCAVADOR SOBRE LLANTAS 115-165 HP 0.75-1.4 yd3 hm 61.7137 104.66 6,459.05 2,406.81 4,052.24 6,459.05
VIBRADOR DE CONCRETO 4 HP 1.35" hm 153.0336 6.44 985.69 367.29 618.40 985.69
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 201.8690 8.05 1,624.34 605.27 1,019.07 1,624.34
ESTACION TOTAL INC. ACCESORIOS hm 9.7829 12.07 118.12 44.02 74.11 118.12
TRIPODE DE METAL SEGUN DISEÑO Und 6.0000 80.50 483.02 179.98 303.03 483.02
16,577.10 16,577.10
COSTO DIRECTO 326,731.00 121,748.27 204,982.72 326,731.00
CRONOGRAMA DE MANO DE OBRA REQUERIDOS

“MEJORAMIENTO DEL SERVICIO DEPORTIVO Y RECREATIVO DEL CENTRO POBLADO DE SAN ANTONIO BAJO,
Obra
DISTRITO DE BAMBAMARCA, PROVINCIA HUALGAYOC, DEPARTAMENTO CAJAMARCA."

Fecha Aug-21
Lugar CAJAMARCA - HUALGAYOC - BAMBAMARCA- SAN ANTONIO
Recurso Unidad Cantidad Precio S/. Parcial S/. 1° MES 2° MES TOTAL

37.26% 62.74%
MANO DE OBRA
TOPOGRAFO hh 9.2938 26.42 245.54 91.49 154.05 245.54
OPERARIO hh 963.4641 23.44 22,583.60 8,415.22 14,168.38 22,583.60
OFICIAL hh 674.5929 18.53 12,500.21 4,657.89 7,842.31 12,500.21
PEON hh 2,434.8704 16.76 40,808.43 15,206.26 25,602.17 40,808.43
COSTO DIRECTO 76,137.77 28,370.87 47,766.90 76,137.77
37.26% 62.74% 100.00%
CRONOGRAMA DE MATERIALES REQUERIDOS

“MEJORAMIENTO DEL SERVICIO DEPORTIVO Y RECREATIVO DEL CENTRO POBLADO DE SAN ANTONIO BAJO,
Obra
DISTRITO DE BAMBAMARCA, PROVINCIA HUALGAYOC, DEPARTAMENTO CAJAMARCA."

Fecha Aug-21
Lugar CAJAMARCA - HUALGAYOC - BAMBAMARCA- SAN ANTONIO
Recurso Unidad Cantidad Precio S/. Parcial S/. 1° MES 2° MES TOTAL

37.26% 62.74%
MATERIALES
ALAMBRE NEGRO RECOCIDO # 16 kg 47.8932 4.03 192.91 71.88 121.03 192.91
ALAMBRE NEGRO RECOCIDO # 8 kg 327.4740 4.03 1,319.07 491.52 827.55 1,319.07
CLAVOS PARA MADERA CON CABEZA DE 3" kg 156.5835 4.03 630.72 235.02 395.70 630.72
TUBO CUADRADO DE ACERO 3/4" X 3/4" X 1.8MM x L=6m Und 36.3498 20.12 731.39 272.54 458.86 731.39
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 486.4335 3.75 1,825.34 680.17 1,145.17 1,825.34
ARENA FINA m3 6.3362 70.00 443.53 165.27 278.26 443.53
PIEDRA CHANCADA DE 1/2" m3 152.8060 60.00 9,168.36 3,416.36 5,752.00 9,168.36
PIEDRA GRANDE DE 8" m3 188.0803 40.00 7,523.21 2,803.34 4,719.87 7,523.21
PIEDRA OVER DE 4" m3 59.4667 40.00 2,378.67 886.35 1,492.32 2,378.67
AFIRMADO m3 78.1763 30.00 2,345.29 873.91 1,471.37 2,345.29
ARENA GRUESA m3 55.4599 70.00 3,882.19 1,446.60 2,435.59 3,882.19
TABLERO ELECTRICO METAL - 8 POLOS Und 1.0000 20.13 20.13 7.50 12.63 20.13
LLAVE TERMOMAGNETICA 2X20A Und 1.0000 32.21 32.21 12.00 20.20 32.21
LLAVE TERMOMAGNETICA 2X16A Und 1.0000 32.21 32.21 12.00 20.20 32.21
ASFALTO RC-250 gal 45.0338 15.30 688.79 256.66 432.13 688.79
LADRILLO KING KONG DE ARCILLA 9 X 12.5 X 24 cm Und 232.5000 0.52 121.48 45.27 76.21 121.48
CABLE ELECTRICO NYY 2 X 6 mm2 m 10.5000 7.25 76.11 28.36 47.75 76.11
CEMENTO PORTLAND TIPO I (42.5 kg) bls 2,808.3129 19.50 54,762.10 20,405.75 34,356.35 54,762.10
MALLA CERCADORA NARANJA rll 1.0000 36.23 36.23 13.50 22.73 36.23
CINTA DE SEÑALIZACION 400M COLOR ROJO rll 1.0000 24.15 24.15 9.00 15.15 24.15
YESO DE 28 Kg bls 87.7298 7.25 635.91 236.96 398.95 635.91
PEGAMENTO PARA PVC 1/4 gl Und 2.2712 24.15 54.85 20.44 34.41 54.85
SOLDADURA CELLOCORD P 3/16" kg 124.0356 11.27 1,397.51 520.75 876.76 1,397.51
MANGUERA HDPE SAP Ø 3/4" C-10 m 150.0000 0.88 132.53 49.38 83.14 132.53
ASPERSOR NAAN 427 DE 3.2 MM Und 6.0000 28.18 169.06 63.00 106.07 169.06
CINTA TEFLON Und 4.0000 0.81 3.23 1.20 2.03 3.23
BANDERIN DE TUBO PVC/C-10 Ø3.5cm L=150cm (133cm DE TUBO + 17cm DE Und 6.0000 201.27 1,207.60 449.98 757.62 1,207.60
ESPIRAL)
CORTADORA DE CÉSPED 3.5HP 20" 3 POSICIONES Und 1.0000 603.81 603.81 225.00 378.82 603.81
FLETE TERRESTRE glb 1.0000 13,735.10 13,336.11 4,969.37 8,366.74 13,336.11
CAPACITACIÓN EN GESTIÓN, OPERACIÓN Y MANTENIMIENTO DEL CAMPO glb 1.0000 2,012.71 2,012.71 749.99 1,262.72 2,012.71
DEPORTIVO
TRAMITE Y GESTIÓN PARA OBTENER EL SERVICIO DEL SUMINISTRO glb 1.0000 402.54 402.54 150.00 252.55 402.54
ELECTRICO
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA , EQUIPOS Y glb 1.0000 805.08 805.08 299.99 505.09 805.08
HERRAMIENTAS
GASOLINA 84 OCTANOS gal 21.5732 10.47 225.85 84.16 141.69 225.85
HORMIGON m3 439.4580 64.41 28,305.49 10,547.35 17,758.14 28,305.49
ALQUILER DE LOCAL PARA ALMACEN mes 2.0000 201.27 402.53 149.99 252.54 402.53
AGUA m3 92.9069 4.75 441.31 164.44 276.87 441.31
IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN COVID-19 EN OBRA glb 1.0000 9,056.53 9,056.53 3,374.69 5,681.84 9,056.53
PLANCHA DE TECNOPOR 1" x 1.20 mt x 2.40 mt pl 48.7954 13.69 667.98 248.91 419.08 667.98
TAPA METALICA DE 45 X 45 cm x 1/8" Und 2.0000 64.40 128.80 47.99 80.81 128.80
TAPA METALICA DE 40 X 40 cm x 1/8" Und 6.0000 56.35 338.12 125.99 212.13 338.12
MADERA TORNILLO p2 3,502.1648 4.83 16,901.45 6,297.91 10,603.54 16,901.45
MADERA EUCALIPTO (p2) p2 47.2500 2.82 133.32 49.68 83.64 133.32
MADERA DE EUCALIPTO ROLLIZO 2"x1.5m pza 20.0000 6.44 128.82 48.00 80.82 128.82
ESTACA DE MADERA EUCALIPTO p2 13.3252 3.21 42.79 15.94 26.84 42.79
MALLA OLIMPICA DE F°G° N°10 COCADA 2" X 2" m2 678.0587 24.15 16,374.44 6,101.53 10,272.91 16,374.44
TAPA CON MARCO FIERRO FUNDIDO 10" X 20" pza 1.0000 32.21 32.21 12.00 20.20 32.21
ANGULO 6m x 1-1/2" x 1-1/2" x 1/8 pulg pza 247.4094 20.13 4,980.47 1,855.85 3,124.62 4,980.47
REJILLA METÁLICA EN PLATINA DE 1 1/4"X1/8" (INC. COLOCACIÓN) m 288.4600 80.51 23,224.64 8,654.09 14,570.55 23,224.64
PINTURA ESMALTE SINTETICO 1/4 gl Und 0.8443 11.27 9.51 3.54 5.97 9.51
TANQUE CISTERNA DE AGUA DE 5000L INC ACCESORIOS Und 2.0000 2,576.27 5,152.53 1,919.97 3,232.57 5,152.53
IMPRESION BANNER m2 8.6500 23.08 199.60 74.38 125.23 199.60
UNION UNIVERSAL DE 1/2" Und 4.0000 2.41 9.65 3.60 6.06 9.65
NIPLE DE F° GALV. DE 3/4" X 2" Und 12.0000 2.25 27.02 10.07 16.95 27.02
TUBO DE FIERRO GALVANIZADO DE 2" X L=6M, E=2MM Und 169.9080 78.90 13,405.32 4,995.16 8,410.15 13,405.32
TUBO CUADRADO DE 1" X 1" L=6M, E=2MM Und 54.8380 22.53 1,235.72 460.46 775.26 1,235.72
ABRAZADERA DE FIERRO GALVANIZADO DE 3/4" Und 6.0000 4.96 29.75 11.09 18.67 29.75
TUBERIA PVC SAP PRESION C-10 C/R. 1/2" X 5m Und 17.2515 8.05 138.81 51.73 87.09 138.81
TUBERIA PVC SAP PRESION C-10 C/R. 3/4" X 5m Und 1.2000 11.27 13.52 5.04 8.48 13.52
TUBERIA PVC SAP PRESION C-10 C/R 1" X 5m Und 66.9960 16.10 1,078.80 401.99 676.81 1,078.80
CODO PVC SAP PARA AGUA CON ROSCA DE 3/4" X 90° Und 6.0000 2.01 12.08 4.50 7.58 12.08
CODO PVC SAP PARA AGUA DE 1" X 90° Und 5.0000 2.82 14.11 5.26 8.85 14.11
CODO CACHIMBA PVC SAP 3/4" X 90° Und 6.0000 2.01 12.08 4.50 7.58 12.08
TEE PVC SAP PARA AGUA SIMPLE PRESION DE 1" Und 7.0000 2.82 19.75 7.36 12.39 19.75
TUBERIA PVC SAL DE 250MM X 6M PARA DESAGUE m 16.0000 19.32 309.17 115.20 193.96 309.17
ADAPTADOR PVC SAP 1/2" Und 4.0000 0.81 3.23 1.20 2.03 3.23
TUBERIA PVC SAL 2" m 28.8750 2.66 76.81 28.62 48.19 76.81
TUBERIA DE POLIETILENO DE ALTA DENSIDAD (HDPE) CORRUGADA m 187.1835 20.13 3,768.10 1,404.09 2,364.01 3,768.10
PERFORADA DE 4"
VALVULA COMPUERTA DE BRONCE DE 1/2" Und 2.0000 12.07 24.15 9.00 15.15 24.15
VALVULA COMPUERTA DE BRONCE DE 3/4" Und 6.0000 16.10 96.62 36.00 60.61 96.62
COSTO DIRECTO 234,016.12 87,200.35 146,815.76 234,016.12
37.26% 62.74% 100.00%
CRONOGRAMA DE EQUIPOS REQUERIDOS

“MEJORAMIENTO DEL SERVICIO DEPORTIVO Y RECREATIVO DEL CENTRO POBLADO DE SAN ANTONIO BAJO,
Obra
DISTRITO DE BAMBAMARCA, PROVINCIA HUALGAYOC, DEPARTAMENTO CAJAMARCA."

Fecha Aug-21
Lugar CAJAMARCA - HUALGAYOC - BAMBAMARCA- SAN ANTONIO
Recurso Unidad Cantidad Precio S/. Parcial S/. 1° MES 2° MES TOTAL

37.26% 62.74%
EQUIPOS
HERRAMIENTAS MANUALES %MO 2,350.00 875.67 1,474.33 2,350.00
CASCO DE PROTECCIÒN Und 20.0000 7.24 144.78 53.95 90.83 144.78
ZAPATOS DE SEGURIDAD PUNTA DE ACERO par 20.0000 30.59 611.80 227.97 383.83 611.80
GUANTES DE CUERO par 20.0000 8.05 160.93 59.97 100.96 160.93
RESPIRADOR CONTRA POLVO Und 10.0000 16.10 161.03 60.00 101.02 161.03
LENTES DE PROTECCION Und 20.0000 6.44 128.82 48.00 80.82 128.82
CHALECO DE PROTECCIÒN Und 20.0000 17.71 354.16 131.97 222.19 354.16
CAMION VOLQUETE DE 10 m3 hm 12.2595 96.61 1,184.34 441.31 743.02 1,184.34
MAQUINA DE SOLDAR 350 A hm 64.0586 8.05 515.45 192.07 323.38 515.45
COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP hm 134.2300 9.65 1,295.59 482.77 812.82 1,295.59
RETROEXCAVADOR SOBRE LLANTAS 115-165 HP 0.75-1.4 yd3 hm 61.7137 104.66 6,459.05 2,406.81 4,052.24 6,459.05
VIBRADOR DE CONCRETO 4 HP 1.35" hm 153.0336 6.44 985.69 367.29 618.40 985.69
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 201.8690 8.05 1,624.34 605.27 1,019.07 1,624.34
ESTACION TOTAL INC. ACCESORIOS hm 9.7829 12.07 118.12 44.02 74.11 118.12
TRIPODE DE METAL SEGUN DISEÑO Und 6.0000 80.50 483.02 179.98 303.03 483.02
COSTO DIRECTO 16,577.10 6,177.05 10,400.05 16,577.10