Está en la página 1de 14

RESUMEN DE VALORIZACIONES

OBRA : "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109


MANUEL GONZALES PRADA DEL CENTRO POBLADO DE PAUCA DISTRITO DE CANCHABAMBA,
ENTIDAD CONTRATANTE : HUACAYBAMBA – HUÁNUCO"
MUNICIPALIDAD DISTRITAL DE CANCHABAMBA
CONTRATISTA : CONSORCIO PAUCA
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO
FECHA DE PRESUPUESTO BASE : ENERO - 2016

RESUMEN DE VALORIZACIONES - OBRA PRINCIPAL

VALORIZACION N° 01 VALORIZACION N° VALORIZACION


02 N° 03VALORIZACION N° 04
PRESUPUESTO 20 AL 30 NOV 2019 26 AL 30 DE AGOST 2020
01 AL 31 DE SET 2020 01 AL 31 DE OCT 2020
PARCIAL PARCIAL
ITEM DESCRIPCION PARCIAL S/. PARCIAL S/. % % % %
S/. S/.
001 PRESUPUESTO DETALLADO S/. 819,280.33 94,191.06 15.97% 228,916.10 38.80% 208,418.42 35.33% 44,364.85 7.52%
DE OBRA
COSTO DIRECTO 819,280.33 94,191.06 15.97% 228,916.10 38.80% 208,418.42 35.33% 44,364.85 7.52%
GASTOS GENERALES (8.35%) S/. 589,954.95 7,873.29 19,134.75 17,421.38 3,708.39
UTILIDAD (9.32%) S/. 49,313.42 8,787.10 21,355.63 19,443.40 4,138.81
SUB TOTAL (CD+GG+UTIL.) 55,036.99 110,851.45 269,406.48 245,283.20 52,212.05
IGV (18%) 694,305.36 19,953.26 48,493.17 44,150.98 9,398.17
COSTO TOTAL DE OBRA 124,974.97 130,804.71 317,899.64 289,434.18 61,610.21

MONTO TOTAL FACTURADO 130,804.71 317,899.64 289,434.18 61,610.21


RETENCION DE FIEL CUMPLIM 81,928.03 40,964.02 50.00% 40,964.01 32.78% 0.00 0.00% 8,002.27 6.40%
MONTO TOTAL COBRADO 89,840.69 276,935.62 289,434.18 53,607.94

ACUMULADO (MONTO FACTURADO) 130,804.71 15.97% 448,704.35 ### 738,138.48 ### 799,748.69 97.62%
ACUMULADO (MONTO COBRADO) 89,840.69 34.03% 366,776.31 ### 656,210.44 ### 709,818.38 76.50%
RESUMEN DE VALORIZACIONES
OBRA : "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109
MANUEL GONZALES PRADA DEL CENTRO POBLADO DE PAUCA DISTRITO DE CANCHABAMBA,
ENTIDAD CONTRATANTE : HUACAYBAMBA – HUÁNUCO"
MUNICIPALIDAD DISTRITAL DE CANCHABAMBA
CONTRATISTA : CONSORCIO PAUCA
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO
FECHA DE PRESUPUESTO BASE : ENERO - 2016

RESUMEN DE VALORIZACIONES - ADICIONAL DE OBRA N° 001


VALORIZACION N° 01
(ADICIONAL DE
OBRA N° 001) -19,531.64
PRESUPUESTO
ITEM DESCRIPCION PARCIAL S/. PARCIAL S/. %
001 PRESUPUESTO DETALLADO 115,905.72 115,905.72 100.00%
DE OBRA
COSTO DIRECTO 115,905.72 115,905.72 100.00%
GASTOS GENERALES (10%) 11,590.57 11,590.57
UTILIDAD (6%) 6,954.34 6,954.34
SUB TOTAL (CD+GG+UTIL.) 134,450.63 134,450.63
IGV (18%) 24,201.11 24,201.11
COSTO TOTAL DE OBRA 158,651.78 158,651.78

MONTO TOTAL FACTURADO 158,651.78


RETENCION DE FIEL CUMPLIMIE 0.00 0.00 0.00%
MONTO TOTAL COBRADO 158,651.78

ACUMULADO (MONTO FACTURADO) 158,651.78 100.00%


ACUMULADO (MONTO COBRADO) 158,651.78 100.00%

VALORIZACION N° 01
(DEDUCTIVO DE
OBRA)
PRESUPUESTO
ITEM DESCRIPCION PARCIAL S/. PARCIAL S/. %
001 PRESUPUESTO DETALLADO 110,096.72 110,096.72 100.00%
DE OBRA
COSTO DIRECTO 110,096.72 110,096.72 100.00%
GASTOS GENERALES (10%) 11,009.67 11,009.67
UTILIDAD (6%) 6,605.80 6,605.80
SUB TOTAL (CD+GG+UTIL.) 127,712.19 127,712.19
IGV (18%) 22,988.19 22,988.19
COSTO TOTAL DE OBRA 150,700.38 150,700.38

MONTO TOTAL FACTURADO 150,700.38


RETENCION DE FIEL CUMPLIMIE 0.00 0.00 0.00%
MONTO TOTAL COBRADO 150,700.38

ACUMULADO (MONTO FACTURADO) 150,700.38 100.00%


ACUMULADO (MONTO COBRADO) 150,700.38 100.00%
RESUMEN DE VALORIZACIONES - CONTRACTUALES TRAMITADAS
OBRA : "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109 MANUEL GONZALES PRADA DEL CENTRO POBLADO DE PAUCA DISTRITO DE CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"

ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE CANCHABAMBA Fecha de Inicio Contractual : 26/01/2016


CONTRATISTA : CONSORCIO PAUCA Término Contractual de Obra : 20/11/2016
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA Término Real de Obra : 30/05/2017
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO Región : Huanuco
PLAZO : 300 DIAS CALENDARIO Distrito : Canchabamba Err:509
C. Poblado : pauca
ADICIONAL N° 001 DEDUCTIVO
VAL. Nº 01 VAL. Nº 02 VAL. Nº 03 VAL. Nº 04 VAL. Nº 05 VAL. Nº 06 VAL. Nº 07 VAL. Nº 08 VAL. Nº 09 VAL. Nº 10 VAL. Nº 11 VAL. Nº 12 VAL. Nº 01 VAL. Nº 01 VALORIZACION
ITEM DESCRIPCION Jan-16 Feb-16 Mar-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Feb-17 Apr-17 May-17 TOTAL
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.

A: VALORIZACION MENSUAL (a precios del valor referencial x FR) 110,851.45 269,406.48 245,283.20 52,212.05 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 115,905.72 110,096.72 Err:509
PRESUPUESTO DETALLADO DE OBRA 110,851.45 269,406.48 245,283.20 52,212.05 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 115,905.72 110,096.72 Err:509

B: REAJUSTE DE VALORIZACION MENSUAL 1,330.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,330.22
REAJUSTES EN PRESUPUESTO DETALLADO (K-1) 1,330.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,330.22

C: VALORIZACIÓN BRUTA ( A + B ) 112,181.67 269,406.48 245,283.20 52,212.05 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 134,450.63 127,712.19 Err:509
D: IMPUESTO GENERAL A LAS VENTAS ( 18% (C) ) 20,192.70 48,493.17 44,150.98 9,398.17 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 24,201.11 22,988.19 Err:509
E: MONTO TOTAL VALORIZADO - FACTURADO ( C + D ) 132,374.37 317,899.64 289,434.18 61,610.21 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 158,651.78 150,700.38 Err:509
F: RETENCIÓN DE FIEL CUMPLIMIENTO Incluye/IGV 40,964.02 40,964.01 0.00 8,002.27 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.00 0.00 Err:509
G: MONTO DE VALORIZACIONES COBRADOS (E) - (F) 91,410.35 276,935.62 289,434.18 53,607.94 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 158,651.78 150,700.38 Err:509
RESUMEN DE VALORIZACIONES CONTRACTUALES Y REAJUSTES PAGADAS
OBRA : "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109 MANUEL GONZALES PRADA DEL CENTRO POBLADO DE PAUCA DISTRITO DE CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"

ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE CANCHABAMBFecha de Inicio Contractual : 26/01/2016


CONTRATISTA : CONSORCIO PAUCA Término Contractual de Obra : 20/11/2016
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA Tèrmino Real de Obra : 30/05/2017
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO Región : Huanuco
PRESUPUESTO : Provincia : Huacaybamba
PLAZO : 300 Días Calendario Distrito : Canchabamba
C. Poblado : pauca

ADICIONAL N° 001 DEDUCTIVO N° 001


VAL. Nº 01 VAL. Nº 02 VAL. Nº 03 VAL. Nº 04 VAL. Nº 05 VAL. Nº 06 VAL. Nº 07 VAL. Nº 08 VAL. Nº 09 VAL. Nº 10 VAL. Nº 11 VAL. Nº 12 VAL. Nº 01 VALORIZACION
ITEM DESCRIPCION Jan-16 Feb-16 Mar-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Feb-17 Apr-17 May-17 TOTAL
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.

A: VALORIZACION MENSUAL (a precios del valor referencial x FR) 110,851.45 269,406.48 245,283.20 52,212.05 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 115,905.72 110,096.72 Err:509
PRESUPUESTO DETALLADO DE OBRA 110,851.45 269,406.48 245,283.20 52,212.05 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 115,905.72 110,096.72 Err:509

B: REAJUSTE DE VALORIZACION MENSUAL 1,330.22 1,330.22 1,330.22 1,330.22 1,330.22 1,330.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,981.30
REAJUSTES EN PRESUPUESTO DETALLADO (K-1) 1,330.22 1,330.22 1,330.22 1,330.22 1,330.22 1,330.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,981.30

C: VALORIZACIÓN BRUTA ( A + B ) 112,181.67 269,406.48 245,283.20 52,212.05 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 134,450.63 127,712.19 Err:509
D: IMPUESTO GENERAL A LAS VENTAS ( 18% (C) ) 20,192.70 48,493.17 44,150.98 9,398.17 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 24,201.11 22,988.19 Err:509
E: MONTO TOTAL VALORIZADO - FACTURADO ( C + D ) 132,374.37 317,899.64 289,434.18 61,610.21 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 158,651.78 150,700.38 5,143,147.13
F: RETENCIÓN DE FIEL CUMPLIMIENTO Incluye/IGV 40,964.02 40,964.01 0.00 8,002.27 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.00 0.00 Err:509
G: MONTO DE VALORIZACIONES COBRADOS (E) - (F) 91,410.35 276,935.62 289,434.18 53,607.94 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 158,651.78 150,700.38 Err:509
NÚMERO:
H: ORDEN DE SERVICIO
FECHA:
NÚMERO:
H: COMPROBANTE DE PAGO
FECHA:
CÁLCULO DE COEFICIENTES DE REAJUSTE REAL (POR FORMULA POLINÓMICA)
OBRA : "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109 MANUEL GONZALES PRADA DEL CENTRO
POBLADO DE PAUCA DISTRITO DE CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE CANCHABAMBA
CONTRATISTA : CONSORCIO PAUCA
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO
FECHA DE PRESUPUESTO BASE : ENERO - 2016
FORMULAS POLINOMICAS : 01 (UNO) de obra principal, 01 (UNO) de Adicional de Obra Y 01 (UNO) del Deductivo de obra

SUB PRESUPUESTO: 001 PRESUPUESTO DETALLADO DE OBRA


K = 0.115*(Mr/Mo) + 0.303*(AGr/AGo) + 0.055*(Cr/Co) + 0.051*(Ar/Ao) + 0.117*(MDr/MDo) + 0.098*(Mr/Mo) + 0.261*(Ir/Io)
INDICE BASE
INDICES UNIFICADOS (IU) Io- Val N° 01 - ENERO 2016
Val N° 02 - FEBREROVal
2016N° 03 - MARZO 2016
Val N° 04 - JULIO 2016
Val N° 05 - AGOSTO
Val2016
N° 06 - SETIEMBRE Val
2016N° 07 - OCTUBRE 2016
Val N° 08 - NOVIEMBRE- 2016
Val N° 09 - DICEMBRE 2016 Val N° 10 FEBRERO 2017
Item Coef.Incidencia
Simbolo Descripcion Cod. NOVIEMBREIr-FEBRERO 2016 Ki Ir-MARZO 2016 Ki Ir-ABRIL 2019 Ki Ir-AGOSTO 2016 Ki Ir-SETIEMBRE 2016 KiIr-OCTUBRE 2016Ki Ir-NOVIEMBRE 2016 Ki Ir-DICIEMBRE Ki Ir-ENERO 2017 Ki Ir-MARZO 2017 Ki
1 M MANO DE OBRA INC. LEYES 47 ### ### 2016
602.110 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115
2 AG AGREGADO GRUESO 05 ### ### 215.690 215.770 0.303 215.770 0.303 216.770 0.305 217.010 0.305 216.020 0.303 215.530 0.303 215.770 0.303 215.770 0.303 216.770 0.305 217.010 0.305
3 C CEMENTO PORTLAND TIPO I 21 ### ### 423.680 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055
4 A ACERO DE CONSTRUCCION LI 02 ### ### 560.330 556.570 0.051 553.530 0.050 550.390 0.050 555.050 0.051 553.890 0.050 548.060 0.050 556.570 0.051 553.530 0.050 550.390 0.050 555.050 0.051
5 MD MADERA NACIONAL PARA ENC43 ### ### 685.650 690.110 0.118 691.260 0.118 693.100 0.118 696.940 0.119 698.040 0.119 702.380 0.120 690.110 0.118 691.260 0.118 693.100 0.118 696.940 0.119
6 M MAQUINARIA Y EQUIPO IMP 49 ### ### 311.070 309.880 0.098 309.140 0.097 309.080 0.097 312.350 0.098 311.910 0.098 308.840 0.097 309.880 0.098 309.140 0.097 309.080 0.097 312.350 0.098
7 I INDICE GENERAL DE PRECIO 39 ### ### 451.180 452.290 0.262 452.870 0.262 457.080 0.264 457.750 0.265 457.360 0.265 458.290 0.265 452.290 0.262 452.870 0.262 457.080 0.264 457.750 0.265
### KENE 19 1.002 KFEB 19 1.000 KABR 19 1.004 KMAY 19 1.008 KJUN 19 1.005 KJUL 19 1.005 KENE 19 1.002 KFEB 19 1.000 KABR 19 1.004 KMAY 19 1.008
NOTA: Los coeficientes de reajustes se han redondeado a tres decimales

SUB PRESUPUESTO: 001 ADICIONAL DE OBRA N° 001


K = 0.093*(Mr/Mo) + 0.691*(Ar/Ao) + 0.216*(Cr/Co)

INDICES UNIFICADOS (IU) INDICE BASE Val N° 01


Item Coef.Incidencia Io- (ADICIONAL)
Simbolo Descripcion Cod. NOVIEMBRE
Ir-FEBRERO 2017 Ki
1 M MANO DE OBRA INC. LEYES 47 ### ### 602.110 600.400 0.093
2 A AGREGADO GRUESO 05 ### ### 215.690 217.010 0.695
3 C CEMENTO PORTLAND TIPO I 21 ### ### 423.680 423.680 0.216
### KJUL 19 1.004
NOTA: Los coeficientes de reajustes se han redondeado a tres decimales

SUB PRESUPUESTO: 001 ADICIONAL DE OBRA N° 001


K = 0.093*(Mr/Mo) + 0.691*(Ar/Ao) + 0.216*(Cr/Co)
INDICE Val N° 01
INDICES UNIFICADOS (IU) BASE (DEDUCTIVO)
Item Coef. Incidencia Io-
Simbolo Descripcion
Cod. NOVIEMBR Ir-JUNIO 2017 Ki
1 M MANO D47 0.093 100.000% 602.110 600.400
E 2016 0.093
2 A AGREG 05 0.691 100.000% 215.690 216.020 0.692
3 C CEMENT21 0.216 100.000% 423.680 423.680 0.216
1.000 KJUL 19 1.001
NOTA: Los coeficientes de reajustes se han redondeado a tres decimales
Val N° 11 ABRIL 2017 Val N° 12-MAYO 2017
Ir-MAYO 2017 Ki Ir-JUNIO 2017 Ki
600.400 0.115 600.400 0.115
216.020 0.303 215.530 0.303
423.680 0.055 423.680 0.055
553.890 0.050 548.060 0.050
698.040 0.119 702.380 0.120
311.910 0.098 308.840 0.097
457.360 0.265 458.290 0.265
KJUN 19 1.005 KJUL 19 1.005
CÁLCULO DE REAJUSTES RECALCULADOS
OBRA :
"AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109 MANUEL GONZALES PRADA DEL CENTRO POBLADO DE PAUCA DISTRITO DE CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE CANCHABAMBA
CONTRATISTA : CONSORCIO PAUCA
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO
FECHA DE PRESUPUESTO BASE : ENERO - 2016

VALORIZACION N° 01 VALORIZACION N°1


VALORIZACION N° 01
VALORIZACION N° 02
VALORIZACION N° 03
VALORIZACION N° 04 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 (ADICIONAL DE (DEDUCTIVO DE
OBRA N° 001) OBRA)
SUB PRESUPUESTO: 001 PRESUPUESTO D 20 AL 30 NOV 201926 AL 30 DE AGOST 2020
01 AL 31 DE SET 202001 AL 31 DE OCT 2020 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PARCIAL
S/. PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
ITEM DESCRIPCION % % % % % % % % % % % % % %
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
001 PRESUPUESTO DETALLADO DE 819,280.33 94,191.06 11.50% 228,916.10 27.94% 208,418.42 25.44% 44,364.85 5.42% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 282,355.56 34.46% Err:509 Err:509 115,905.72 100.00% 110,096.72 13.44%
OBRA 11.50% 39.44% 64.88% 70.29% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100.00% Err:509
COSTO DIRECTO 819,280.33 94,191.06 11.50% 228,916.10 27.94% 208,418.42 25.44% 44,364.85 5.42% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 34.46% Err:509 Err:509 115,905.72 100.00% 110,096.72 13.44%
GASTOS GENERALES (13.10%) 107,309.45 7,873.29 19,134.75 17,421.38 3,708.39 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 11,590.57 11,009.67
UTILIDAD (10%) 81,928.03 8,787.10 21,355.63 19,443.40 4,138.81 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 6,954.34 6,605.80
SUB TOTAL (CD+GG+UTIL.) 1,008,517.81 110,851.45 269,406.48 245,283.20 52,212.05 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 134,450.63 127,712.19
FACTOR DE REAJUSTE (K) 1.002 1.000 1.004 1.008 1.005 1.005 1.002 1.000 1.004 1.008 1.005 1.005 0.000 0.000
MONTO DE REAJUSTE: =(K-1)*[NONTO VALORIZA 221.70 0.00 981.13 417.70 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.00 0.00
MONTO DE REAJUSTE (FINAL) 221.70 0.00 981.13 417.70 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.00 0.00
1.002
1.000
1.004
1.008
Err:509 1.005
1.005
1.002
VALORIZACIONES DE OBRA RECALCULADOS - K DEFINITIVOS
OBRA : "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109 MANUEL GONZALES PRADA DEL CENTRO POBLADO DE PAUCA DISTRITO DE
CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE CANCHABAMBA
CONTRATISTA : CONSORCIO PAUCA
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO
FECHA DE PRESUPUESTO BASE : ENERO - 2016
FORMULAS POLINOMICAS : 01 (UNO) de obra principal, 01 (UNO) de Adicional de Obra Y 01
(UNO) del Deductivo de obra
VALORIZACION REAL EJECUT. S/. MES DE VALORIZAC. PROGRAMADA REAJUSTE REAJUSTE REAJUSTE VALORIZACION REAL RECALCULADA
VAL.
FECHA PRESUPUESTO K RECONOCIDO
Nº PARCIAL (A) PARCIAL ACUM. PAGO PARCIAL PARCIAL ACUM. REAL EJECT. REAL PROGR. PARCIAL: (A+B) SUB TOTAL IGV 18% VALO. RECALC
(B)
110,851.45 448,616.82 111,073.15 19,993.17 131,066.32
01 1/1/2016 PRESUPUESTO DETALLADO DE 110,851.45 1.002 448,616.82 221.70 897.23 221.70 111,073.15
ENE 16

380,257.93 711,236.57 269,406.48 48,493.17 317,899.65


02 2/1/2016 PRESUPUESTO DETALLADO DE 269,406.48 FEBR 2016 1.000 262,619.75 0.00 0.00 0.00 269,406.48

625,541.13 755,135.55 246,264.33 44,327.58 290,591.91


03 3/1/2016 PRESUPUESTO DETALLADO DE 245,283.20 MAR-16 1.004 43,898.98 981.13 175.60 981.13 246,264.33

677,753.17 924,675.72 52,629.75 9,473.35 62,103.10


04 7/1/2016 PRESUPUESTO DETALLADO DE 52,212.05 ABR-16 1.008 169,540.17 417.70 1,356.32 417.70 52,629.75

Err:509 1,077,988.60 Err:509 Err:509 Err:509


05 8/1/2016 PRESUPUESTO DETALLADO DE Err:509 MAY-16 1.005 153,312.88 Err:509 766.56 Err:509 Err:509

Err:509 1,405,521.05 Err:509 Err:509 Err:509


06 9/1/2016 PRESUPUESTO DETALLADO DE Err:509 JUN-16 1.005 327,532.45 Err:509 1,637.66 Err:509 Err:509

Err:509 1,843,100.45 Err:509 Err:509 Err:509


07 10/1/2016 PRESUPUESTO DETALLADO DE Err:509 JUL-16 1.004 437,579.40 Err:509 1,750.32 Err:509 Err:509

Err:509 2,145,833.36 Err:509 Err:509 Err:509


08 11/1/2016 PRESUPUESTO DETALLADO DE AGOST-16
Err:509 1.005 302,732.91 Err:509 1,513.66 Err:509 Err:509

Err:509 2,597,567.96 Err:509 Err:509 Err:509


09 12/1/2016 PRESUPUESTO DETALLADO DE Err:509 SETI-16 1.004 451,734.60 Err:509 1,806.94 Err:509 Err:509

Err:509 2,972,326.92 Err:509 Err:509 Err:509


10 2/1/2017 PRESUPUESTO DETALLADO DE Err:509 OCTUB-16 1.008 374,758.96 Err:509 2,998.07 Err:509 Err:509

Err:509 3,499,959.67 Err:509 Err:509 Err:509


11 4/1/2017 PRESUPUESTO DETALLADO DE Err:509 NOV-16 1.005 527,632.75 Err:509 2,638.16 Err:509 Err:509

Err:509 4,016,484.39 Err:509 Err:509 Err:509


12 5/1/2017 PRESUPUESTO DETALLADO DE Err:509 DIC-16 1.005 516,524.72 Err:509 2,582.62 Err:509 Err:509

AD Err:509 1,521,426.77 116,137.53 20,904.76 137,042.29


ADICIONAL DE OBRA N° 001 115,905.72 JUN-19 1.002 115,905.72 231.81 231.81 231.81 116,137.53
01

AD Err:509 1,953,197.17 110,977.49 19,975.95 130,953.44


ADICIONAL DE OBRA N° 001 110,096.72 JUN-19 1.008 110,096.72 880.77 880.77 880.77 110,977.49
01

TOTALES Err:509 4,132,390.11 19,235.72 Err:509 Err:509 Err:509 Err:509


SALDO FINAL DE CONTRATO DE OBRA
OBRA: "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109 MANUEL
GONZALES PRADA DEL CENTRO POBLADO DE PAUCA DISTRITO DE CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"

ANALISIS:
CRITERIOS GENERALES
El Expediente de Liquidación de la obra ejecutada, se realiza en concordancia con lo establecido en el reglamento de la Ley de
Contrataciones y Adquisiciones del Estado y normas complementarias.

PROCEDIMIENTO
VALORIZACIONES TRAMITADAS Y PAGADAS
Se ha tramitado y pagado 06 valorizaciones contractuales, 01 valorizacion adicional.
Total de valorizaciones pagadas S/. Err:509
Total de Valorizaciones Recalculados (Liquidación) S/. Err:509

Diferencia por pagar: S/. Err:509

DE LOS REINTEGROS Y REAJUSTES S/IGV


Total de Reajute pagadas: S/. 0.00
Total de Reajuste para Liquidación: S/. Err:509
Diferencia por pagar S/IGV Err:509

DE LOS ADELANTOS
Total de Adelanto Directo Pagadas: S/. 0.00
Total de Adelanto Directo en la Liquidación: S/. 0.00
Diferencia por pagar 0.00

AMORTIZACIONES Y DEDUCCIONES
Amortizaciones pagadas adelanto directo: S/. 0.00
Amortizaciones recalculadas adelanto directo: S/. 0.00
Diferencia por pagar 0.00

Deducciones pagadas adelanto directo: S/. 0.00


Deducciones recalculas adelanto directo: S/. 0.00
Diferencia por pagar 0.00

DE LA RETENCION (FONDO DE GARANTIA)


De acuerdo a la Ley de Contrataciones y Adquisiciones del Estado, se debe haber retenido a la Empresa el 10% del monto total del
contrato como garantía de fiel cumplimiento.

Monto Retenido S/. -81,928.03


Monto recalculado S/. 0.00
Diferencia por pagar 81,928.03

DEL I.G.V.
De acuerdo con lo establecido en las bases de cada valorización neta se ha calculado el 18% por IGV, siendo el resultado final como
sigue:

IGV monto pagado S/. Err:509


IGV monto recalculado S/. Err:509
Diferencia por pagar Err:509

Pág. 10/14
SALDO FINAL DE CONTRATO DE OBRA
OBRA: "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109 MANUEL
GONZALES PRADA DEL CENTRO POBLADO DE PAUCA DISTRITO DE CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"

DOCUMENTACION DE LA OBRA
Toda la documentación en la que se sustenta la presente Liquidación de Obra se encuentra contenida en el presente expediente de
liquidacion.

LIQUIDACION FINAL DE LA OBRA


En base a todo lo expuesto, se determina como resultado de la Liquidación Final del contrato de la obra:
"AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN LA I.E. Nº 84109 MANUEL GONZALES PRADA DEL
CENTRO POBLADO DE PAUCA DISTRITO DE CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"
el siguiente resultado:

RETENCION
FONDO DE
PROCEDMIENTO VALORIZACION REAJUSTES AMORTIZACION DEDUCCIONES SUB TOTAL S/. IGV (18%) TOTAL S/.
GARANTIA
C/IGV
PAGADOS Err:509 0.00 0.00 0.00 Err:509 Err:509 -81,928.03 Err:509
RECALCULADOS Err:509 Err:509 0.00 0.00 Err:509 Err:509 0.00 Err:509
DIFERENCIA A PAGAR Err:509 Err:509 0.00 0.00 Err:509 Err:509 81,928.03 Err:509

TOTAL SALDO A FAVOR DEL CONTRATISTA S/. Err:509

SALDO A FACTURAR POR EL CONTRATISTA S/. Err:509


El monto a cancelar al contratista, correspondes al saldo de Liquidacion originado de los reajustes de precios.

Pág. 11/14
RESUMEN DE LIQUIDACION DE OBRA
OBRA : "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS EN
LA I.E. Nº 84109 MANUEL GONZALES PRADA DEL CENTRO POBLADO DE PAUCA
DISTRITO DE CANCHABAMBA, HUACAYBAMBA – HUÁNUCO"

ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE CANCHABAMBA


CONTRATISTA : CONSORCIO PAUCA
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO
MONTO CONTRATO CONTRACTUAL : S/. 4,364,225.20 (S/IGV)
MONTO CONTRATO CONTRACTUAL : S/. 5,149,785.74 (C/IGV)

MONTOS,
MONTOS DIFERENCIA
TRAMITADOS Y
ITEM DESCRIPCION PAGADOS A PAGAR
RECALCULADOS
S/. S/.
S/.

(A) DE LAS VALORIZACIONES (Tramitadas Vs. Pagadas)


Valorizaciones Ppto. Principal Err:509 Err:509 Err:509

(B) REINTEGROS Y REAJUSTES


Reajuste Ppto. Principal Err:509 0.00 Err:509

(C) ADELANTO OTORGADO


Adelanto Directo 0.00 0.00
Adelanto por materiales 0.00 0.00
TOTAL ADELANTOS 0.00 0.00 0.00

(D) AMORTIZACION
Amortizacion Adelanto Directo 0.00 0.00
Amortización Adelanto por Materiales 0.00 0.00
TOTAL ADELANTOS 0.00 0.00 0.00

(E) DEDUCCIONES
Deducción del Adelanto Directo 0.00 0.00
Deducción del Adelanto por Materiales 0.00 0.00
TOTAL DEDUCCION 0.00 0.00 0.00

(F) TOTAL GENERAL PPTO. PRINCIPAL (A+B+C+D+E) Err:509 Err:509 Err:509

(G) IGV 18% DE (G) Err:509 Err:509 Err:509

(H) SALDO DE LIQUIDACION (F+G) CORRESPONDIENTE A REAJUSTES Err:509 Err:509 Err:509


(I) RETENCIONES
DEVOLUCIÓN DE GARANTIA DE FIEL CUMPLIMIENTO (10%) c/IGV 0.00 -81,928.03 81,928.03

(J) TOTAL SALDO A FAVOR DEL CONTRATISTA (H + I) S/. Err:509

MONTO A FACTURAR POR EL CONTRATISTA S/. Err:509


RESUMEN DE LIQUIDACION FINAL DE CONTRATO

OBRA : "AMPLIACIÓN Y MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS


EDUCATIVOS EN LA I.E. Nº 84109 MANUEL GONZALES PRADA DEL CENTRO
POBLADO DE PAUCA DISTRITO DE CANCHABAMBA, HUACAYBAMBA –
HUÁNUCO"
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE CANCHABAMBA
CONTRATISTA : CONSORCIO PAUCA
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA
ING. RESIDENTE : ING. JUAN ANTONIO JIMENEZ CARRASCO
FECHA DE PRESUPUESTO BASE : ENERO - 2016
FORMULAS POLINOMICAS : 01 (UNO) de obra principal, 01 (UNO) de Adicional de Obra Y 01
(UNO) del Deductivo de obra

MONTOS
MONTOS DIFERENCIA
ITEM DESCRIPCION RECALCULADOS
PAGADOS S/. A PAGAR S/.
S/.
A: VALORIZACION BRUTA Err:509 Err:509 Err:509
PRESUPUESTO DETALLADO DE OBRA Err:509 Err:509

B: REAJUSTES DE PRECIOS Err:509 0.00 Err:509


REAJUSTES EN PRESUPUESTO DETALLADO (K-1) Err:509 0.00

C: AMORTIZACIONES 0.00 0.00 0.00


Del Adelanto Directo 0.00 0.00
Del Adelanto por Materiales 0.00 0.00
D: DEDUCCIONES 0.00 0.00 0.00
Del Adelanto Directo 0.00 0.00
Del Adelanto por Materiales 0.00 0.00
E: PAGO DE INTERESES DE VALORIZACIONES 0.00 0.00 0.00
Interes Legal 0.00 0.00
Otros 0.00 0.00

F: SUB TOTAL ( A) + (B) + (C) + (D) + (E) Err:509 Err:509 Err:509

G: IMPUESTO GENERAL A LAS VENTAS ( 18% (F) ) Err:509 Err:509 Err:509

H: COSTO OBRA PRINCIPAL (F) + (G) Err:509 Err:509 Err:509


I: RETENCIONES 0.00 -81,928.03 81,928.03
RETENCIÓN DE FIEL CUMPLIMIENTO Incluye/IGV 0.00 -81,928.03

MONTO A COBRAR POR EL CONTRATISTA (H) S/. Err:509

MONTO A FACTURAR POR EL CONTRATISTA S/. Err:509


RECÁLCULO DEL COEFICIENTE DE REAJUSTE
OBRA : "MEJORAMIENTO DEL ORNATO DE LA PLAZA PRINCIPAL DEL CENTRO POBLADO DE VICOS, DISTRITO DE MARCARÁ, PROVINCIA DE CARHUAZ -
ANCASH"
ENTIDAD CONTRATANTE : MUNICIPALIDAD DISTRITAL DE MARCARÁ
CONTRATISTA : CONSORCIO VICOS
ING. SUPERVISOR : ING. OSCAR ELMER CHAVEZ MEJIA
ING. RESIDENTE : ING. EMILIO ARROYO PEREZ
PRESUPUESTO CONTRATADO : S/. 124,974.97
FECHA DE PRESUPUESTO BASE : Noviembre - 2018
FORMULAS POLINOMICAS : 01 (UNO) de obra principal y 01 (UNO) de Adicional de Obra

SUB PRESUPUESTO: 001 PRESUPUESTO DETALLADO DE OBRA


K = 0.115*(Mr/Mo) + 0.303*(AGr/AGo) + 0.055*(Cr/Co) + 0.051*(Ar/Ao) + 0.117*(MDr/MDo) + 0.098*(Mr/Mo) + 0.261*(Ir/Io)
INDICE BASE
INDICES UNIFICADOS (IU) Io- Val N° 01 - DICIEMBRE Val
2018N° 02 - ENERO 2019
Val N° 03 - MARZO 2019
Val N° 04 - ABRIL 2019
Val N° 05 - MAYO 2019
Val N° 06 - JUNIO 2019
Item Coef.Incidencia
Simbolo Descripcion Cod. NOVIEMBRE Ir-ENERO 2019 Ki Ir-FEBRERO 2019Ki Ir-ABRIL 2019 Ki Ir-MAYO 2019 Ki Ir-JUNIO 2019 Ki Ir-JULIO 2019 Ki
1 M MANO DE OBRA INC. LEYES 47 2018
### ### 602.110 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115 600.400 0.115
2 AG AGREGADO GRUESO 05 ### ### 215.690 215.770 0.303 215.770 0.303 216.770 0.305 217.010 0.305 216.020 0.303 215.530 0.303
3 C CEMENTO PORTLAND TIPO I 21 ### ### 423.680 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055 423.680 0.055
4 A ACERO DE CONSTRUCCION L 02 ### ### 560.330 556.570 0.051 553.530 0.050 550.390 0.050 555.050 0.051 553.890 0.050 548.060 0.050
5 MD MADERA NACIONAL PARA ENC43 ### ### 685.650 690.110 0.118 691.260 0.118 693.100 0.118 696.940 0.119 698.040 0.119 702.380 0.120
6 M MAQUINARIA Y EQUIPO IMP 49 ### ### 311.070 309.880 0.098 309.140 0.097 309.080 0.097 312.350 0.098 311.910 0.098 308.840 0.097
7 I INDICE GENERAL DE PRECIO 39 ### ### 451.180 452.290 0.262 452.870 0.262 457.080 0.264 457.750 0.265 457.360 0.265 458.290 0.265
### KENE 19 1.002 KFEB 19 1.000 KABR 19 1.004 KMAY 19 1.008 KJUN 19 1.005 KJUL 19 1.005
NOTA: Los coeficientes de reajustes se han redondeado a tres decimales

SUB PRESUPUESTO: 001 ADICIONAL DE OBRA N° 001


K = 0.093*(Mr/Mo) + 0.691*(Ar/Ao) + 0.216*(Cr/Co)

INDICE BASE Val N° 01


INDICES UNIFICADOS (IU) Io- (ADICIONAL) -
Item Coef.Incidencia JUNIO 2019
NOVIEMBRE
Simbolo Descripcion Cod. 2018 Ir-JULIO 2019 Ki
1 M MANO DE OBRA INC. LEYES 47 ### ### 602.110 600.400 0.093
2 A AGREGADO GRUESO 05 ### ### 215.690 215.530 0.690
3 C CEMENTO PORTLAND TIPO I 21 ### ### 423.680 423.680 0.216
### KJUL 19 0.999
NOTA: Los coeficientes de reajustes se han redondeado a tres decimales