GUA SOBRE COSTOS

PROMEDIO DE CONSTRUCCIN
ACTUALIZACIN 2013

Guatemala 2013

NDICE

PRESENTACIN............................................................................................................................
INTRODUCCIN............................................................................................................................
1. PLANIFICACIN Y ESPECIFICACIONES COMPLETAS (DESCRIPCIN)........................
1.1
Especificaciones tcnicas ......................................................................................................
2.
COSTOS UNITARIOS (CDULAS DE COSTOS) .........................................................
2.1.
Factores de clculo ................................................................................................................
3.
UBICACIN GEOGRFICA ............................................................................................
4.
DURACIN DE EJECUCIN DEL PROYECTO ...........................................................
5.
POLTICAS SALARIALES ..................................................................................................
6.
DEFINICIN DE GASTOS DIRECTOS E INDIRECTOS .............................................
7.
COSTO DE FINANCIAMIENTO ......................................................................................
8.
IMPUESTOS Y FIANZAS ...................................................................................................
FACTORES DE FLETE Y ACARREO DE MATERIALES ................................................................
Ejemplo de utilizacin de factores de flete y acarreo ...........................................................................
Factores de transporte de maquinaria ................................................................................................
Ejemplo de utilizacin del factor de transporte de maquinaria ............................................................
COSTOS PROMEDIO COSTOS UNITARIOS .........................................................................
Costo unitario promedio de estufa mejorada ......................................................................................
Costo unitario promedio de letrinas ..................................................................................................
Costo unitario promedio de canchas polideportivas ..........................................................................
Costos unitarios promedio de centros de acopio ................................................................................
Costo unitario promedio de techo piso (vivienda mnima) ................................................................
Costos unitarios promedio de equipamiento de escuelas de primaria .................................................
Costos unitarios promedio de equipamiento de escuelas de preprimaria ............................................
Costos unitarios promedio de equipamiento para centros
de convergencia, puestos de salud y centros de salud ..........................................................................
Costos unitarios promedio de renglones requeridos ..........................................................................
EVALUACIN DE PRESUPUESTOS ...........................................................................................
Informacin necesaria para evaluacin de presupuestos .....................................................................
ANEXO 1 ........................................................................................................................................
TABLA DE DESCRIPCIN DE EDIFICIOS ESCOLARES TPICOS .........................................
ANEXO 2 ........................................................................................................................................
CUADRO DE REAS DE EDIFICIOS EDUCATIVOS TPICOS ...............................................
ANEXO 3 .........................................................................................................................................
COSTOS DE EDIFICIOS ESCOLARES .......................................................................................
ANEXO 4 ........................................................................................................................................
COSTOS DE PUESTOS DE SALUD Y CENTROS DE SALUD ..................................................
ANEXO 5 ..........................................................................................................................................
COSTOS UNITARIOS PROYECTOS DE ALCANTARILLADO ...................................................
ANEXO 6 .........................................................................................................................................
COSTOS UNITARIOS PROYECTOS DE CAMINOS ..................................................................
ANEXO 7 ..........................................................................................................................................
COSTOS UNITARIOS DE PUENTES ............................................................................................
ANEXO 8 .........................................................................................................................................
COSTOS UNITARIOS DE PROYECTOS DE AGUA POTABLE ....................................................
ANEXO 9 ..........................................................................................................................................
COSTOS UNITARIOS DE PROYECTOS DE MINIRIEGO ............................................................
ANEXO 10 .........................................................................................................................................
PARAMETROS DE COSTOS UNITARIOS POR UNIDAD DE MEDIDA .................................
ANEXO 11 .......................................................................................................................................
EQUIPOS DE BOMBEO PARA POZOS .........................................................................................
ANEXO 12 .......................................................................................................................................

Sistema Nacional de Inversin Pblica (SNIP)

5
6
7
7
7
8
8
8
8
9
9
9
9
10
11
11
11
11
12
14
14
14
14
14
14
15
15
15
17
18
18
19
19
20
20
24
24
26
26
27
27
36
36
40
40
45
45
49
49
51
51

PRESENTACIN

Esta es la quinta edicin de la Gua de costos promedio, que se pone a disposicin de


los usuarios del Sistema Nacional de Inversin Pblica (SNIP), como insumo facilitador
en el clculo de costos en la formulacin de proyectos de inversin. Como siempre se
ha afirmado, esta gua no sustituye en ningn caso, los clculos de costos de las unidades
ejecutoras que ya tienen sistemas establecidos y que adems, la especializacin de las
mismas les confiere un amplio conocimiento de la estructura de costos de los proyectos
que formulan.
El factor costo junto con la carga de trabajo que ofrece el proyecto, as como el tiempo
necesario para realizarlo, son bases sobre las cuales se cimienta los proyectos, he ah la
importancia que el SNIP le da a la estructura de costos de los proyectos y por ello ao
con ao se recaban datos, se procesan y analizan, siendo el resultado final la Gua de
Costos Promedio
Este documento contiene algunos parmetros que orientan al evaluador en su tarea de
determinar si el costo del proyecto propuesto por los postulantes, est dentro de los
parmetros de los precios de los bienes y servicios que intervienen en el mismo. Es una
herramienta prctica y sencilla que como ya se indic, proporciona parmetros de costos
para los proyectos de inversin que realiza el gobierno en toda la Repblica.
Para analizar los costos de un proyecto determinado es necesario conocer todas las
condiciones del mismo.
Para poder integrar un presupuesto se hace necesario conocer entre otros aspectos las
siguientes variables: planificacin y especificaciones completas (descripcin del proyecto
analizado); costos unitarios; ubicacin geogrfica (costos en el rea y condiciones del
terreno); duracin de ejecucin del proyecto; polticas salariales; definicin de gastos
indirectos; costo de financiamiento; Impuestos y fianzas
La descripcin del proyecto debe ser presentada por medio de planos y un listado de
especificaciones que describan a cabalidad el proyecto incluyendo, las condiciones actuales
del terreno (ubicacin, topografa, acceso, etc.), la forma de pago de la mano de obra,
el tiempo de ejecucin planificado y la disponibilidad de inversin. Cualquier aspecto
que se desconozca del proyecto traer consigo errores en el costeo.
Se deber tener una imagen clara y completa del proyecto que se est presupuestando
y formarse una imagen mental previa de las actividades que deben tomarse en cuenta
para la realizacin del mismo. Esta imagen es el punto de partida para la evaluacin de
cualquier costo y debe ser prefigurada antes de entrar a analizar los costos que se plantean
para evitar que estos influyan en la primera aproximacin.
Para el clculo de los renglones que integran los costos unitarios existen diferentes tipos
de factores que simplifican su creacin. Estos son: factores de uso, de desperdicio, de
aumento de volumen, de compresin, de clculo de ayudante, etc. La determinacin de
estos factores con exactitud es primordial para la determinacin del costo del proyecto.
La Direccin de Inversin Pblica de la SEGEPLAN, iniciar el prximo ao la
construccin de un sistema de costos, donde adems de poderse simular los proyectos,
se podrn realizar clculos con alto grado de precisin, tomando en cuenta las fluctuaciones
de precios del mercado, tanto de materiales como de mano de obra.
Este instrumento tiene carcter referencial y no indicativo.

Sistema Nacional de Inversin Pblica (SNIP)

INTRODUCCIN

Gua sobre costos

Para poder determinar con buen grado de exactitud el costo de un proyecto, al elaborar
el presupuesto es necesario trabajar con precios actualizados de los materiales de
construccin que forman parte de los costos unitarios; esta actualizacin se hace por
medio de cotizaciones de los proveedores que tienen presencia en el medio, con el objetivo
de que la integracin de los costos unitarios sea lo ms real posible y de esta manera al
integrar el presupuesto por renglones de trabajo este refleje los costos de mercado.

promedio de

El costo de un proyecto de un tipo determinado (carretera, puente, escuela, etc.) ser


integrado de acuerdo a las especificaciones tcnicas que se elaboran para tal efecto, el
presupuesto deber ser elaborado por un tcnico o profesional en la materia y no debera
presentar variaciones o diferencias significativas en el monto del proyecto, ya que los
criterios de ingeniera que se utilizan de base para la elaboracin de las especificaciones
y la forma de cuantificar los materiales, mano de obra calificada y no calificada, herramienta
y equipo son standard y conocidos en el medio.
Lo que s afecta el costo del proyecto es el precio de los materiales que se utilizan y que
pueden ser diferentes dependiendo de la localidad, tambin depender del lugar donde
se ubique el terreno para la construccin de la obra y la distancia entre este y la localidad
de donde provendrn los materiales, debido a que si el acceso es difcil y el sitio se
encuentra distante el flete se encarece y en ocasiones el acceso es tan difcil que no permite
el ingreso de vehculo hasta el lugar donde se construir la obra por lo que se hace
necesario acarrear los materiales, encareciendo an ms la infraestructura.

Construccin 2013

El presente trabajo tiene como objetivo actualizar los parmetros de costos para los
proyectos de inversin que realiza el gobierno en toda la Repblica.
Para actualizar los costos de un proyecto determinado es necesario conocer todas las
condiciones de mercado para que este sea lo ms real posible.
Para poder integrar un presupuesto se hace necesario conocer entre otros aspectos las
siguientes variables:
1. - Planificacin y especificaciones completas (descripcin del proyecto analizado)
2. - Costos unitarios
3.- Ubicacin geogrfica (costos en el rea y condiciones del terreno)
4. - Duracin de ejecucin del proyecto
5. - Polticas salriales
6. - Definicin de gastos indirectos
7. - Costo de financiamiento
8. - Impuestos y fianzas

Sistema Nacional de Inversin Pblica (SNIP)

1. PLANIFICACIN Y ESPECIFICACIONES COMPLETAS (DESCRIPCIN)

La descripcin del proyecto debe ser presentada por medio de planos y un listado de especificaciones que
describan a cabalidad el proyecto incluyendo, las condiciones actuales del terreno (ubicacin, topografa,
acceso, etc.), la forma de pago de la mano de obra, el tiempo de ejecucin planificado y la disponibilidad
de inversin. Cualquier aspecto que se desconozca del proyecto traer consigo errores en l costeo.
Se deber tener una imagen clara y completa del proyecto que se est presupuestando y formarse una imagen
mental previa de las actividades que deben tomarse en cuenta para la realizacin del mismo. Esta imagen
es el punto de partida para la evaluacin de cualquier costo y debe ser prefigurada antes de entrar a analizar
los costos que se plantean para evitar que estos influyan en la primera aproximacin.
Para el clculo de los renglones que integran los costos unitarios existen diferentes tipos de factores que
simplifican su creacin. Estos son: factores de uso, de desperdicio, de aumento de volumen, de compresin,
de clculo de ayudante, etc. La determinacin de estos factores con exactitud es primordial para la determinacin
del costo del proyecto.
Para el diseo a nivel de construccin, el detalle de ingeniera debe ser el adecuado para la obtencin de
todos los materiales necesarios, as mismo la precisa programacin para la implementacin del trabajo
propuesto. Esto implica un nivel de ingeniera avanzado, representado por un juego de planos de construccin
y un paquete de especificaciones tcnicas que incluya las condiciones especiales, segn se requiera.

1.1

Especificaciones tcnicas

Las especificaciones tcnicas deben definir con claridad cmo se deben realizar tcnicamente los renglones
especificados a cargo del contratista (ejecutor), o como se debe ejecutar la provisin de determinado equipo.
Las especificaciones tcnicas no son un manual constructivo, deben definir la funcin de cada material, as
como su calidad y las normas internacionales o nacionales con las cuales deben cumplir; se debe tener claro
que la responsabilidad de la construccin es del contratista.
Durante los pasos intermedios de la construccin, debe verificarse los diferentes requerimientos de las normas
establecidas.
Estas son especficas de cada proyecto y hay que considerarlas para la integracin de los costos unitarios,
ya que inciden directamente en stos.

2. COSTOS UNITARIOS (CDULAS DE COSTOS)


Es el elemento funcional ms pequeo que compone un proyecto, y est a su vez formado por elementos
unitarios de mano de obra, materiales, maquinaria y/o otros costos unitarios.
Se le denomina funcional ms pequeo, porque depende de la magnitud del presupuesto. Por ejemplo: El
costo total de una casa puede a su vez ser el costo unitario de una urbanizacin donde se construirn 500
casas del mismo tipo. El costo de esta casa a su vez estar formado por otra serie de costos unitarios que se
denominan costos unitarios hijos o cdulas hijas.
A las cdulas hijas de costos se les denomina tambin como partidas o renglones. Las cdulas deben estar
integradas por todos los materiales y mano de obra necesarias para su ejecucin, incluyendo factores como
el de desperdicio de materiales, prestaciones laborales, imprevistos y costos indirectos.

Sistema Nacional de Inversin Pblica (SNIP)

En ocasiones, la herramienta del proyecto es presupuestada individualmente y se le incluye como una cdula
independiente; otras veces es calculada como un porcentaje de la mano de obra (este oscila entre el 2% y
4%). Para los efectos de clculo de los costos unitarios que se presentarn, el porcentaje de herramienta ser
del 2%.

2.1

Factores de clculo
Gua sobre costos

Los factores de clculo de los costos unitarios se utilizan para poder hacer estos ms flexibles. Con los factores
se puede dar un incremento o decremento de los costos dependiendo de la complejidad del proyecto. Se
utilizan regularmente los siguientes factores: Prestaciones laborales, desperdicio de materiales, imprevistos,
gastos indirectos, gastos generales y utilidad.
Estos factores se encuentran a su vez afectados por las siguientes situaciones que hacen variar su ponderacin:
Sistema constructivo utilizado, complejidad de la obra, grado de detalle de la planificacin, ubicacin
geogrfica, polticas en la contratacin del personal, leyes aplicables, etc.
Para los costos de los proyectos contemplados en este trabajo, los factores de clculo que se utilizan
regularmente, ya estarn incluidos.

promedio de

3. UBICACIN GEOGRAFICA

Construccin 2013

Para elaborar un presupuesto es importante contar con informacin de la ubicacin donde se llevar a cabo
la obra, es necesario conocer las facilidades de acceso y de la existencia de distribuidores de materiales de
construccin y de los precios locales; para considerar en la integracin de los costos todos estos factores que
varan de un lugar a otro e inciden en el costo de la obra.

4. DURACIN DE EJECUCIN DEL PROYECTO


Es importante elaborar un buen programa de ejecucin del proyecto utilizando los tiempos estimados por
rengln para determinar el tiempo total que se necesitara para su construccin, tomando en consideracin
todos aquellos factores que pueden afectar en un momento determinado cumplir con lo programado, como
por ejemplo: el invierno, si el sitio es accesible todo el tiempo, la entrega de los materiales por el distribuidor,
etctera. Con un cronograma deficiente se tendrn atrasos y como consecuencia se incrementara el pago
de la mano de obra y los gastos administrativos de la empresa ejecutora, incurriendo en gastos muchas veces
innecesarios.

5. POLTICAS SALARIALES
Para la elaboracin de presupuestos es indispensable conocer las polticas salriales aplicables como el cdigo
de trabajo, la bonificacin del decreto 78-89 y utilizar el salario base mnimo exigido por la ley.
En construccin a diferencia de otras actividades donde el salario es mensual, el pago de prestaciones se
calcula sobre la base de salario a destajo o salario diario. Como los salarios a destajo estn basados en
rendimientos diarios, las prestaciones se calculan en funcin del salario diario. Se debe determinar los das
efectivos que labora un trabajador en la construccin y los porcentajes de las diferentes prestaciones laborales
aplicables en Guatemala, como indemnizacin, aguinaldo, vacaciones, IGSS, bono catorce, etctera; aplicando

Sistema Nacional de Inversin Pblica (SNIP)

todo esto al salario base para integrar el salario real de la mano de obra calificada as como de la no calificada,
utilizando esta informacin en la integracin de los costos unitarios del proyecto.

6. DEFINICIN DE GASTOS DIRECTOS E INDIRECTOS


Los gastos directos son todos aquellos que pueden ser directamente atribuibles a la ejecucin del proyecto
tales como: materiales, mano de obra calificada y no calificada, herramienta, equipo y maquinaria.
Los gastos indirectos son los que no pueden ser directamente atribuibles a la ejecucin del proyecto.
Bsicamente son los gastos ocasionados por el funcionamiento de la compaa. Entre estos se encuentran
los gastos administrativos, la direccin tcnica de campo, gastos de papelera, mobiliario y otros.

7. COSTO DE FINANCIAMIENTO
Independientemente de que para financiar la obra se recurra al mercado financiero o no, siempre existe un
costo de financiamiento que hay que tomar en cuenta, si la empresa utiliza su propio capital de trabajo, este
costo puede ser reducido a la tasa activa promedio del sistema bancario.
Para el costo de financiamiento se debe tener un diseo del flujo de caja para determinar cul ser el monto
de la inversin que la empresa debe aportar en la construccin del proyecto.

8. IMPUESTOS Y FIANZAS
En la integracin del presupuesto se debe incluir aquellos impuestos que son directamente aplicables al
proyecto como son el valor agregado (IVA) y las respectivas fianzas que se deben presentar, como la fianza
de anticipo, de sostenimiento de oferta, de cumplimiento de contrato, etctera. El costo aproximado de las
fianzas es del orden del 3.00 por ciento del costo total del proyecto.
Existen otros impuestos que son aplicables a la utilidad generada por la empresa en un ejercicio fiscal y no
al costo de un proyecto en particular, por lo tanto estos no deben ser incluidos.
A continuacin se presentan los datos actualizados con precios al ao 2005 de los diferentes costos incluidos
en la gua.

FACTORES DE FLETE Y ACARREO DE MATERIALES


Para poder estimar los costos de los fletes y acarreo de materiales hacia los lugares donde se construirn los
proyectos es necesario contar con factores en funcin del peso y del recorrido en kilmetros para los diferentes
tipos de transporte que se pueden utilizar, dependiendo del acceso existente y de la topografa del terreno.
En funcin de lo anterior se consideran cuatro factores de flete de acuerdo al tipo de vehculo que se utilice
segn lo siguiente:

Sistema Nacional de Inversin Pblica (SNIP)

Pick Up (20 a 30 qq)


Camin eje sencillo (200 qq):
Guatemala;
Quetzaltenango
Petn
Puerto Barrios

Q. 85.00/qq
Q. 0.30km/qq
Q. 0.35km/qq
Q. 0.15km/qq
Q. 0.23km/qq
Q. 0.28km/qq
Q. 0.34km/qq
Q. 0.15km/qq
Q. 0.23km/qq

Plataforma (2000 qq)


Guatemala
Quetzaltenango
Petn
Puerto Barrios

Q. 0. 26km/qq
Q. 0. 35km/qq
Q. 0.15 km/qq
Q. 0. 23km/qq

Gua sobre costos

Camin eje doble (500 qq)


Guatemala
Quetzaltenango
Petn
Puerto Barrios

Acarreo

promedio de

Cuando no existe camino accesible para vehculo es necesario acarrear los materiales por medio de mulas
o por peones, para llevarlos hasta el punto de la obra, para clculo del acarreo se puede utilizar:
Q. 2.40/Km/qq

En Guatemala existen poblados que no tienen acceso por va terrestre, por lo que se hace necesario el
transporte areo o fluvial.

Avioneta de 9 qq
Avioneta de 12 qq

Construccin 2013

Para el transporte areo lo comn es que se utilice avioneta, el costo del flete por quintal depende de la
capacidad del aparato, por lo que se tienen los siguientes factores:
Q. 3,680.00 el viaje o bien Q. 408.90/qq
Q. 4,600.00 el viaje o bien Q. 383.30/qq

Para el transporte por ros o lagos se utiliza comnmente lancha o lanchn y el valor del flete ser en funcin
de la capacidad y de la duracin del viaje: as:
Capacidad
200 qq
50 qq

Duracin del Viaje


40 min. - 60 min.
15 min. - 30 min.

Costo del Viaje


Q. 6,103.00 - Q. 7,060.00
Q. 1,500.00 - Q. 1 ,600.00

Lo que implicara que al utilizar una lancha de 200 qq, se tiene un costo por quintal de Q.32.35/qq a Q.
37.50/qq, con un costo promedio de Q. 34.92/qq.
Al utilizar la de menor capacidad y menor tiempo de viaje se tiene un costo por quintal de Q. 30.00/qq a
Q. 32.00/qq, con un costo promedio de Q. 31.00/qq.

Ejemplo de utilizacin de factores de flete y acarreo


Para ejemplificar el uso de los factores anteriores supondremos que el peso de la edificacin es de 3,200
quintales y hay que recorrer 108 kilmetros en camino de terracera entre Huehuetenango y San Sebastin
Coatan (solo ingresa camin de eje sencillo), adems hay que acarrear los materiales 20 kilmetros.

Sistema Nacional de Inversin Pblica (SNIP)

10

Flete 3,200 qq * 108 Km * Q. 0.30/Km/qq

Q. 103 680.00

Acarreo 3,200 qq * 20 Km * Q. 2.40/Km/qq

Q. 153,600.00

Costo Total Flete y Acarreo

Q. 257 280.00

Si se tiene que transportar los 3,200 quintales, el recorrido es de 50 kilmetros en camino de terracera
(ingresa camin de eje doble), hay que transportar los materiales en pick up y se tiene un recorrido en lancha
de 40 minutos.
Flete Camin 3,200 qq * 50 Km * Q. 0.28/Km/qq

Q. 44 800.00

Flete Pick up 3,200 qq * Q. 85.00/qq

Q. 272,000.00

Flete Lancha 3,200 qq * Q. 32.35/qq

Q. 103,520.00

Costo Total Flete

Q. 420 320.00

El flete por lancha se puede calcular de la forma siguiente:


Peso total/capacidad lancha = 3,200 qq/200qq = 16 viajes
Flete Lancha = No. De Viajes * Costo Viaje = 16 viajes * Q. 6,470.00/viaje
Flete Lancha = Q. 103,520.00

Factores de transporte de maquinaria


En los proyectos en los que es necesario utilizar maquinaria para su construccin, principalmente caminos
de acceso, hay que considerar el transporte de la maquinaria que por sus caractersticas no puede viajar
utilizando su propia locomocin, (por ejemplo: tractor D6, patrol o moto niveladora, compactadoras de
rodillo o neumtica, etctera), los factores que a continuacin se presentan estn en funcin del kilometraje
que se recorre y del rea geogrfica que se ha determinado; para efectos de clculo hay que considerar el
nmero de mquinas que se transportarn y los viajes de ida y vuelta de la misma.
Para los Departamentos de Peten, Alta Verapaz, Quiche, Huehuetenango; Q.75.00.00/km.
Para Escuintla, Suchitepequez, Santa Rosa, El Progreso, Chiquimula, Zacapa, Jutiapa y Jalapa; Q.46.50/km.
Para Guatemala, San Marcos, Quetzaltenango, Solola, Chimaltenango, Sacatepequez y Totonicapn; Q60.20.
Fuente de informacin: Empresa Repetto, Servicios de trasporte de maquinaria pesada. Sr. Lus Verdugo,
Tel. 66289494

Ejemplo de utilizacin del factor de transporte de maquinaria


Si se tiene que transportar maquinaria a San Juan Tecuaco en Santa Rosa una distancia de 108 kilmetros
y son 6 mquinas
Flete Maquinaria = 6 mquinas * 2 viajes * 108 Km * Q. 75.00/Km, = Q. 97,200.00

COSTOS PROMEDIO COSTOS UNITARIOS


Costo unitario promedio de estufa mejorada
Para la estufa economizadora de lea o estufa mejorada se estim un costo promedio de:

11

Sistema Nacional de Inversin Pblica (SNIP)

a) Con aporte de materiales locales


b) Sin aporte de materiales locales

Q.1, 292.50
Q.1, 707.50

Materiales locales: 2 costales de barro cernido o fino Q.70.00; 2 costales de arena blanca o selecta Q.70.00;
2 costales de arena de ri Q.80.00; 3 tiempos alimentacin para el albail Q.45.00; 1 mano de obra no
calificada Q.50.00.

Costo unitario promedio de letrinas

Letrina de Pozo Ventilado


Instalacin
Total

Gua sobre costos

En el rea rural se construyen bsicamente dos tipos de letrinas, para las cuales tambin se estim el costo
promedio por unidad, el costo de estos vara de acuerdo al material que se utilice para la caseta, en este caso
se considera de fibra de vidrio, que es el material que actualmente se est implementando.
Q. 1,828.40
Q. 1,200.00
Q. 3,028.40

Letrina Abonera Seca Familiar (LASF): Letrina plstica de fibra de vidrio:


Q. 2,900.00
Q. 235.00
Q. 450.00
Q. 430.00
Q. 1,200.00

promedio de

Con Cabina
Pequea con asiento para nio
De plancha con canalito
De plancha lisa
Costo promedio de instalacin

No.

RENGLN / DESCRIPCIN

1
LETRINA DE POZO SECO VENTILADO
1.01 BROCAL
MATERIAL LOCAL
ARENA DE RIO
LADRILLO TAYUYO 6.5 x 11 x 23 cm
TOTAL MATERALES
MATERIAL NO LOCAL
CEMENTO
TOTAL MATERALES
1.02 PLANCHA DE CONCRETO
MATERIAL LOCAL
ARENA DE RIO
PIEDRIN
TOTAL MATERALES
MATERIAL NO LOCAL
CEMENTO
ALAMBRE DE AMARRE
HIERRO DE 1/4"
TOTAL MATERIALES

CANTIDAD

UNIDAD

PRECIO
UNITARIO

COSTO

Q 126.20
Q 5.00
Q 97.50
Q 102.50

1
1

U
U

0.04
75.00

m
u

Q 125.00
Q 1.30

0.30

saco

Q 79.00

1.00

Q 23.70
Q 23.70
Q 132.85

0.06
0.09

m
u

Q 125.00
Q 175.00

Q 7.50
Q 15.75
Q 23.25

1.00
0.50
2.30

saco
lb.
varilla

Q 79.00
Q 6.00
Q 12.00

Q 79.00
Q 3.00
Q 27.60
Q 109.60

Sistema Nacional de Inversin Pblica (SNIP)

Construccin 2013

LETRINA DE POZO SECO VENTILADO

12

No.

RENGLN / DESCRIPCIN

1.03 CASETA
MATERIAL NO LOCAL
PLANCHA FRIBROLIT DE 4' x 8' x 11 mm
PLANCHA FRIBROLIT DE 4' x 8' x 8 mm
ANGULAR 2" x 2" x 20'
CON PERFORACIONES
BISAGRA DE 3" x 2"
ARANDELA PLANA
ARANDELA DE ZINC
ARANDELA DE HULE
PASADOR PLANO 2"
PERNOS DE 12" x 1/4" ROSCADO
TORNILLO 1 1/4" x 1/4" CON ROSCA
TORNILLO BUSCAR ROSCA 1"
PARA MADERA EN PASADOR
TORNILLO BUSCAR ROSCA 1 1/4"
PARA PASADOR
LAMINA DE ZINC C-28 DE 6'
FLEJES DE MADERA 3 1/2" x 3/4" X 67"
TOTAL MATERALES
1.04 ACCESORIOS (incluye taza)
MATERIAL NO LOCAL
NIPLE PVC DE 3" x 1.50 m. DE 100 PSI
PINTURA ANTICORROSIVA
TUBO PVC 3" C-100 PSI
ABRAZADERA PARA TUBO PVC 3"
CODO PVC 3" X 90
CEDAZO TIPO MOSQUITERO PLASTICO
TAZA DE FIBRA DE VIDRIO
TOTAL MATERALES
TOTAL RENGLN
Fuente: UNICEF y Unepar

13

Sistema Nacional de Inversin Pblica (SNIP)

CANTIDAD

UNIDAD

PRECIO
UNITARIO

COSTO

2.50
0.50

u
u

Q120.00
Q120.00

Q 300.00
Q 60.00

1.00

juego

Q260.00

Q 260.00

2.00
118.00
6.00
6.00
2.00
6.00
60.00

u
u
u
u
u
u
u

Q 12.00
Q 1.00
Q 1.00
Q 1.00
Q 3.50
Q 6.50
Q 1.00

Q 24.00
Q 118.00
Q 6.00
Q 6.00
Q 7.00
Q 39.00
Q 60.00

15.00

1.00

15.00

8.00

1.00

8.00

2.00
2.00

u
u

Q 60.00
Q 5.00

Q 120.00
Q 10.00
Q 1,033.00
Q 536.35

Q
Q
Q
Q
Q
Q
Q

Q 13.25
Q 6.50
Q 108.00
Q 18.00
Q 90.00
Q 0.60
Q 300.00
Q 536.35
Q1,828.40

1.00
0.10
0.50
3.00
3.00
0.10
1.00

u
galn
tubo
u
u
m
u

Q 1,033.00

13.25
65.00
216.00
6.00
30.00
6.00
300.00

Costo unitario promedio de canchas polideportivas


Con el objetivo de proporcionar un lugar adecuado para la prctica de los deportes, los diferentes Ministerios
que invierten es este aspecto estn construyendo canchas polideportivas en las que se pueden practicar
bsquet ball, papi fut ball y vley ball; estas instalaciones tienen los siguientes costos promedio:
Canchas Polideportivas de 16mX28m
Parque Infantil + Cancha Polideportiva
Complejo Deportivo y Cultural

Q. 160,000.00 a Q. 265,000.00
Q. 145,000.00 a Q. 700,000.00
Q. 100,000.00 a Q. 250,000.00

Gua sobre costos

Costos unitarios promedio de centros de acopio


Para este tipo de infraestructura se determinaron los costos de diferentes centros de acopio, ya que estos
vara de acuerdo al producto que se acopia y al volumen del mismo, para determinar el costo de un
determinando proyecto de centro de acopio se necesitaran el detalle de renglones o actividades que lo
componen, los cuales sern muy diversos de acuerdo al diseo de cada tipo de acopio y es casi imposible
poder determinar los costos unitarios de cada rengln o actividad; por tal razn la informacin que aqu
se proporciona es sobre la base de centros ya construidos y para que se tenga un dato de referencia para
efectos de comparacin con proyectos similares.
Q. 750,000.00
Q. 700,000.00
Q. 350,000.00
Q. 700,000.00
Q. 450,000.00
Q. 1, 200,000.00

promedio de

Centro de Acopio de Pescado


Centro de Acopio de Hortalizas
Centro de Acopio de Leche
Centro de Acopio de Frutas
Centro de Acopio de Caf
Beneficio Hmedo de Caf

Costo unitario promedio de techo piso (vivienda mnima)

Techo Piso (sin paredes)


Techo Piso (con paredes)

Construccin 2013

Actualmente existe un programa que dota de los materiales bsicos para la construccin de vivienda, en el
cual se pueden dar dos modalidades, una es dotar solo los materiales para techo (clavo para lmina, lmina
de zinc calibre 28, canal galvanizado, capote de lmina galvanizada, pescantes) y la otra es considerar ciertos
materiales para el levantado de paredes parcial (los materiales anteriores y quinientos blocks); los costos son
los siguientes:
Q. 3,450.00
Q. 5,550.00

Costos unitarios promedio de equipamiento de escuelas de primaria y preprimaria


Para el equipamiento de edificios escolares del nivel preprimario y primario se entrega a las escuelas pblicas:
DESCRIPCIN
Escritorio unipersonal
Pizarrn de formica, con marco de
Madera y tablero de avisos, de corcho

COSTO UNITARIO (Q.)


Q. 155.00 ---- Q.180.00
Q. 3,058.00

Costos unitarios promedio de equipamiento para puestos de salud y centros de salud


Para los precios del equipamiento de las diferentes instalaciones que dan cobertura en el sector salud, se
consideraron los estndares del Ministerio de Salud para equipamientos nuevos.
DESCRIPCIN

Costo Unitario

Puesto de Salud
Centro de Salud

Q. 114,750.00
Q.2, 530,000.00

Sistema Nacional de Inversin Pblica (SNIP)

14

Costos unitarios promedio de renglones requeridos


Puerta de metal con chapa Yale (instalada)
Estructura de techo troquelada (metlica)
Cubierta lmina Perfil 10
(instalada)
Cubierta lmina de Zinc, 10 pies, Calibre 28
Piso de granito (sobre suelo)
Piso torta de cemento (0.10 m espesor)
Piso de cemento lquido
Ventana de metal con vidrio (instalada)
Ventana de aluminio mil finish con vidrio
Inodoro completo tipo econmico (instalado)
Lavamanos completo tipo econmico (inst)
Toma corriente doble (instalado)
Lmpara fluorescente sin difusor 2 tubos de
40 watt y 48 de largo (instalada)
Losa 0.10 m de espesor, hierro #3
Azulejo nacional (instalado)
Muro perimetral de malla
Muro perimetral de block (limpio)

Q. 2,000.00/unidad
Q. 430.00/m
Q. 285.00/m
Q. 175.00/m
Q.
200.00/m
Q.
225.00/m
Q.
175.00/m
Q.
850.00/m
Q.
900.00/m
Q.
750.00/unidad
Q.
600.00/unidad
Q.
400.00/unidad
Q.
Q.
Q.
Q.
Q.

900.00/unidad
800.00/m
300.00/m
400.00/m
1,500.00/m

EVALUACIN DE PRESUPUESTOS
La Auditoria de presupuestos de construccin es el anlisis pormenorizado de ste para determinar si es
tcnicamente aceptable y son confiables los resultados que expone. Es una actividad que rara vez se realiza
y por ello las divergencias entre el costo real y el costo supuesto.
Los niveles de anlisis de un presupuesto pueden ser muy variados y de diferentes grados de dificultad, desde
una comparacin sencilla entre el costo por metro cuadrado de construccin entre lo planificado y lo que
se conoce por la experiencia, hasta un anlisis exhaustivo de costo de renglones unitarios (cdulas de costos).
La profundidad del estudio est ntimamente ligada a la informacin disponible dentro del presupuesto y
el grado de exactitud que se desee.
El principal objetivo al efectuar una revisin de costos es descubrir datos que afectarn el presupuesto y que
no son evidentes dentro de la informacin presentada en los planos y especificaciones.
INFORMACIN NECESARIA PARA EVALUACIN DE PRESUPUESTOS
Para evaluar la confiabilidad de un presupuesto se requiere que la informacin presentada haga factible su
revisin. La informacin necesaria es la siguiente:
1. Descripcin del Proyecto
Se debe tener una imagen mental, clara y completa del proyecto y de todas las actividades que deben tomarse
en cuenta para realizar el mismo. Esta imagen es el punto de partida para la evaluacin de cualquier costo.
De ser posible se debe tener una idea de cul ser el costo final de la obra y cada una de sus fases. La persona
que est evaluando el presupuesto debe conocer el tipo de proyecto del que se trata.
2. Conocimiento del lugar y situacin del predio donde se construir
Se debe tratar de determinar aquellos factores que afectarn el costo de la obra, por ejemplo el estado y
situacin del terreno donde se construir; la calidad del acceso que influye en los costos; as como la
disponibilidad de los servicios bsicos como lo son agua, energa elctrica, etctera.
3. Listado de Cdulas (Renglones/Actividades) de Costos
stos son todos los costos unitarios utilizados para realizar el presupuesto. Es recomendable que se presenten
por lo menos algunos ejemplos de cmo se calcularon estas cdulas para poder medir su alcance y exactitud.

15

Sistema Nacional de Inversin Pblica (SNIP)

4. Factores Utilizados
Para un mejor anlisis es necesario que se cuente con la ponderacin de los factores utilizados; como lo son:
los factores de prestaciones laborales, factor de desperdicio, imprevistos, indirectos, gastos generales, etctera.
5. Resumen de Cdulas de Costos por Rengln
Es necesario que se presente una clasificacin por grandes rubros, por ejemplo: trabajos preliminares,
estructuras, muros, acabados, techos, puertas, ventanas, electricidad, etctera.

Gua sobre costos

6. Listado de Materiales y Mano de Obra Presupuestados


Es necesario que se presente un listado con la totalidad de materiales presupuestados, la mano de obra
presupuestada; as como los presupuestos de los sub contratistas (ejemplo: electricidad, puertas, etctera);
y las cotizaciones de equipo especial (ejemplo: aire acondicionado, etctera).
Se debe realizar una verificacin de algunos de los costos de los materiales presupuestados con los proveedores
y una revisin de qu tan actualizado sea el presupuesto y las cotizaciones presentadas.

promedio de

En la revisin hay que tener especial cuidado de obtener la informacin de los mismos materiales y en las
mismas unidades de medida que aparecen en el presupuesto.
7. Reunin con la persona que prepar el presupuesto
La persona que elabor el presupuesto deber explicar qu factores utiliz y por qu; y en caso de haber
omitido algn rengln, cmo afecta ste el costo estipulado. La persona que revisa el presupuesto antes de
esta reunin deber tener conocimiento del proyecto para poder realizar un sondeo adecuado.

Construccin 2013

Sistema Nacional de Inversin Pblica (SNIP)

16

CUADRO DE PESOS

ANEXO 1

PESO DE LOS MATERIALES PARA TRANSPORTE


ESPECIFICACIONES

1
2
3

4
5
6

8
9
10
11
12
13

Arena de ro = 35 qq/m
Pedrn = 35 qq/m
Joist Tipo 1 = 4.5 Kg
Joist Tipo 2 = 6.1 Kg
Joist Tipo 3 = 8.3 Kg
Lmina P10 = 6.88 lb/pi
Lmina galvanizada = 2 lb/pi
Block tabique = 13 lb/u
Block 15 = 16 lb/u
Solera 15 = 16 lb/u
Block 20 = 21.8 lb/u
Solera 20 = 22.8 lb/u
Costanera 2"x8"X1/16" = 50 lb/u
Costanera 2"x6"X1/16" = 40 lb/u
Costanera 2"x4"X1/16" = 30 lb/u
Tayuyo (6.5x11x23) = 6 lb/u
Plancha = 70 lb/u
Tubo cemento 4" = 30 lb/u
Tubo cemento 6" = 40 lb/u
Azulejo (11X11) = 0.5 lb/u
Madera = 4 lb/pie-tabla
Piso de Granito = 1.25 qq/m

Fuente: Cuantificacin propia

17

Sistema Nacional de Inversin Pblica (SNIP)

Anexo 1

ANEXO 2 TABLA DE DESCRIPCIN


DE EDIFICIOS ESCOLARES

Gua sobre costos

TABLA DE DESCRIPCIN DE EDIFICIOS ESCOLARES TPICOS


(Actualizacin Gua de costos 2,013)
ESCUELAS DE PRIMARIA
No.

12
13
14
15
16
17
18
1
2
3

Construccin 2013

11

Edificio FN-100 aula pura


Edificio FN-110 aula, cocina y bodega
Edificio FN-200, 2 aulas puras
Edificio FN-210, 2 aulas, cocina y bodega
Edificio FN-300, 3 aulas puras
Edificio FN-310, 3 aulas, cocina y bodega
Mdulo GB-1, guardiana + bodega: 1 dormitorio, s.s, cocina, patio y bodega
Edificio EU-09, 1 aula (saln de usos mltiples)
Edificio EU-400, PB-2 aulas, PA- 2 aulas
Edificio EU 600, PB-3 aulas, PA- 3 aulas
Edifico EU-622, PB-3 aulas +S.S. (5 retretes mujeres + retretes hombres), PA- 3 aulas + S.S.
(5 retretes mujeres + retretes hombres)
Edificio EU-800, PB 4 aulas, PA-3 aulas
Mdulo MG-1, modulo de gradas + voladizo
Mdulo MG-2, modulo de gradas sin voladizo
Mdulo SS-10D, 4 retretes + 2 lavamanos colectivos + 1 urinal colectivo
Mdulo SS-20D, servicio sanitario mujeres (3 retretes + 1 lavamanos colectivo), servicio S.S. hombres
(3 retretes + 1 lavamanos colectivo + 1 urinal colectivo)
Mdulo SS-30, 9 retretes + 2 lavamanos colectivos + 1 urinal colectivo
Mdulo LL-3, 3 letrinas lavables
ESCUELAS DE PREPRIMARIA
Edificio de parvulos PP-1, 1 aula + S.S. (1 retrete + 1 lavamos colectivo)
Edifico de parvulos PP-2, 2 aulas + S.S. (2 retretes + 2 lavamnos colectivos)
Edificio de parvulos PP-20, 2 aulas, S.S., direccin, bodega, cocina

promedio de

1
2
3
4
5
6
7
8
9
10

ESPECIFICACIONES

PA = Planta Alta
PB = Planta Baja
Edificios FN de 1 nivel
Edificios EU de 2 niveles
Fuente: MICIVI, Unidad de Construccin de Edificios del Estado UCEE mayo 2,013.

Sistema Nacional de Inversin Pblica (SNIP)

18

CUADRO DE REAS

ANEXO 3

REAS DE EDIFICIOS EDUCATIVOS TPICOS


No.

DESCRIPCIN

LIMPIEZA

PISOS

MUROS

TECHOS

VENTANAS

PUERTAS

CONSTRUCCIN

77.00
102.13
242.06
202.37
208.92
379.90

92.80
105.76
128.00
120.30
198.32
213.04

77.52
128.58
126.17
150.21
180.82
311.67

80.59
111.10
159.60
186.82
234.42
261.18

18.90
21.70
35.14
41.06
53.38
58.00

1.00
4.00
2.00
5.00
3.00
6.00

68.49
94.13
135.18
160.82
201.86
227.50

114.76

28.00

98.58

50.74

7.84

4.00

42.87

273.84
283.23
271.11
333.55
469.13
82.27
64.64
48.88
60.00
165.81
54.01

152.28
308.61
489.61
588.89
650.00
43.79
14.18
37.67
41.31
42.22
17.69

77.43
197.95
280.13
460.92
364.48
47.60
83.09
92.61
10.74
142.30
29.91

184.20 23.82
287.65 52.96
582.24 79.62
647.01 92.10
692.16 105.92
49.78
2.15
31.33
2.20
34.51
3.45
41.00
4.84
88.57
7.58
6.30
-----

3.00
4.00
6.00
26.00
8.00
1.00
1.00
7.00
8.00
15.00
3.00

167.71
267.16
521.14
488.14
690.47
41.92
25.30
34.60
41.27
86.55
6.00

4.00
8.00
13.00

69.90
183.23
238.54

8
9
10
11
12
13
14
15
16
17
18

ESCUELAS DE PRIMARIA
Edificio fFN-100
Edificio fFN-110
Edificio fFN-200
Edificio FN-210
Edificio FN-300
Edificio fFN-310
Mdulo guardiana
y bodega GB-1
Edificio EU-09
Edificio EU-400
Edificio EU-600
Edificio EU-622
Edificio EU-800
Mdulo gradas MG-1
Mdulo gradas MG-2
Mdulo servicio sanitario SS-10d
Mdulo servicio sanitario SS-20d
Mdulo servicio sanitario SS-30
Mdulo letrina lavable LL-3

1
2
3

ESCUELAS DE PREPRIMARIA
Edificio de prvulos PP-1
207.51 94.80 99.52 107.37
Edificio de prvulos PP-2
337.66 132.21 141.86 203.48
Edificio de prvulos PP-20
379.53 190.56 239.29 255.28

1
2
3
4
5
6
7

Edificios FN de 1 nivel
Edificios EU de 2 niveles
Fuente: MICIVI, Unidad de Construccin de Edificios del Estado UCEE- Mayo 2,013.

19

Sistema Nacional de Inversin Pblica (SNIP)

16.61
31.47
41.30

ESCUELAS PRIMARIA
Edificio FN-100
Edificio FN-110
Edificio FN-200
Edificio FN-210
Edificio FN-300
Edificio FN-310
Mdulo guardiana
y bodega GB-1
Edificio EU-09
Edificio EU-400
Edificio EU-600
Edificio EU-622
Edificio EU-800
Mdulo gradas MG-1
Mdulo gradas MG-2
Mdulo servicio sanitario SS-10D
Mdulo servicio sanitario SS-20D
Mdulo servicio sanitario SS-30
Mdulo letrina lavable LL-3
Fosa sptica; 1.00*3.50*1.85m,
Concreto
Pozo de absorcin, 15.00 m Prof.
ESCUELAS PREPRIMARIA
Edificio de prvulos PP-1
Edificio de prvulos PP-2
Edificio de prvulos PP-20

DESCRIPCIN

374,076.00
639,616.00
928,788.00

48,058.00

10,954.00

400,505.00
1,128,442.00
1,626,607.00
2,118,061.00
2,178,698.00
231,239.00
197,858.00
241,660.00
305,118.00
587,004.00
70,767.00

245,596.00

224,910.00
329,920.00
393,550.00
465,302.00
575,273.00
731,874.00

Costo Q.

GUATEMALA

47,913.83
0.997
372,953.77
637,697.15
926,001.64

10,921.14

399,303.49
1,125,056.67
1,621,727.18
2,111,706.82
2,172,161.91
230,545.28
197,264.43
240,935.02
304,202.65
585,242.99
70,554.70

244,859.21

224,235.27
328,930.24
393,550.00
463,906.09
573,547.18
729,678.38

Costo Q.

EL PROGRESO

48,826.93
1.016
380,061.22
649,849.86
943,648.61

11,129.26

406,913.08
1,146,497.07
1,652,632.71
2,151,949.98
2,213,557.17
234,938.82
201,023.73
245,526.56
309,999.89
596,396.06
71,899.27

249,525.54

228,508.56
335,198.72
399,846.80
472,746.83
584,477.37
743,583.98

Costo Q.

SACATEPEQUEZ

47,961.88
0.998
373,327.85
638,336.77
926,930.42

10,932.09

399,703.99
1,126,185.12
1,623,353.79
2,113,824.88
2,174,340.60
230,776.52
197,462.28
241,176.68
304,507.76
585,829.99
70,625.47

245,104.81

224,460.18
329,260.16
392,762.90
464,371.40
574,122.45
730,410.25

Costo Q.

CHIMALTENANGO

Construccin 2013

Fuente: MICIVI, Unidad de Construccin de Edificios del Estado -UCEE- Junio 2,013.

1
2
3

20

19

8
9
10
11
12
13
14
15
16
17
18

1
2
3
4
5
6

No.

47,817.71
0.995
372,205.62
636,417.92
924,144.06

10,899.23

398,502.48
1,122,799.79
1,618,473.97
2,107,470.70
2,167,804.51
230,082.81
196,868.71
240,451.70
303,592.41
584,068.98
70,413.17

244,368.02

223,785.45
328,270.40
391,582.25
462,975.49
572,396.64
728,214.63

Costo Q.

ESCUINTLA

244,122.42

223,560.54
327,940.48
391,188.70
462,510.19
571,821.36
727,482.76

Costo Q.

SANTA ROSA

47,769.65
0.994
371,831.54
635,778.30
923,215.27

10,888.28

398,101.97
1,121,671.35
1,616,847.36
2,105,352.63
2,165,625.81
229,851.57
196,670.85
240,210.04
303,287.29
583,481.98
70,342.40

promedio de

Sistema Nacional de Inversin Pblica (SNIP)

49,499.74
1.03
385,298.28
658,804.48
956,651.64

11,282.62

412,520.15
1,162,295.26
1,675,405.21
2,181,602.83
2,244,058.94
238,176.17
203,793.74
248,909.80
314,271.54
604,614.12
72,890.01

252,963.88

231,657.30
339,817.60
405,356.50
479,261.06
592,531.19
753,830.22

Costo Q.

TOTONICAPN

Edificios FN de 1 nivel
Edificios EU de 2 niveles

49,788.09
1.036
387,542.74
662,642.18
962,224.37

11,348.34

414,923.18
1,169,065.91
1,685,164.85
2,194,311.20
2,257,131.13
239,563.60
204,980.89
250,359.76
316,102.25
608,136.14
73,314.61

254,437.46

233,006.76
341,797.12
407,717.80
482,052.87
595,982.83
758,221.46

Costo Q.

SOLOL

Gua sobre costos

(Actualizacin Gua de Costos 2,013)

COSTOS DE CONSTRUCCIN DE EDIFICIOS EDUCATIVOS

ANEXO 4 COSTOS DE EDIFICIOS


ESCOLARES

20

21

Sistema Nacional de Inversin Pblica (SNIP)

ESCUELAS PRIMARIA
Edificio FN-100
Edificio FN-110
Edificio FN-200
Edificio FN-210
Edificio FN-300
Edificio FN-310
Mdulo guardiana
y bodega GB-1
Edificio EU-09
Edificio EU-400
Edificio EU-600
Edificio EU-622
Edificio EU-800
Mdulo gradas MG-1
Mdulo gradas MG-2
Mdulo servicio sanitario SS-10D
Mdulo servicio sanitario SS-20D
Mdulo servicio sanitario SS-30
Mdulo letrina lavable LL-3
Fosa sptica; 1.00*3.50*1.85m,
Concreto
Pozo de absorcin, 15.00 m Prof.
ESCUELAS PREPRIMARIA
Edificio de prvulos PP-1
Edificio de prvulos PP-2
Edificio de prvulos PP-20

DESCRIPCIN

49,307.51
1.026
383,801.98
656,246.02
952,936.49

11,238.80

410,918.13
1,157,781.49
1,668,898.78
2,173,130.59
2,235,344.15
237,251.21
203,002.31
247,943.16
313,051.07
602,266.10
72,606.94

251,981.50

230,757.66
338,497.92
403,782.30
477,399.85
590,230.10
750,902.72

Costo Q.

QUETZALTENANGO

47,673.54
0.992
371,083.39
634,499.07
921,357.70

10,866.37

397,300.96
1,119,414.46
1,613,594.14
2,101,116.51
2,161,268.42
229,389.09
196,275.14
239,726.72
302,677.06
582,307.97
70,200.86

243,631.23

223,110.72
327,280.64
390,401.60
461,579.58
570,670.82
726,019.01

Costo Q.

SUCHITEPQUEZ

46,087.62
0.959
358,738.88
613,391.74
890,707.69

10,504.89

384,084.30
1,082,175.88
1,559,916.11
2,031,220.50
2,089,371.38
221,758.20
189,745.82
231,751.94
292,608.16
562,936.84
67,865.55

235,526.56

215,688.69
316,393.28
377,414.45
446,224.62
551,686.81
701,867.17

Costo Q.

RETALHULEU

Fuente: MICIVI, Unidad de Construccin de Edificios del Estado -UCEE- Junio 2,013.

1
2
3

20

19

8
9
10
11
12
13
14
15
16
17
18

1
2
3
4
5
6

No.

49,019.16
1.02
381,557.52
652,408.32
947,363.76

11,173.08

408,515.10
1,151,010.84
1,659,139.14
2,160,422.22
2,222,271.96
235,863.78
201,815.16
246,493.20
311,220.36
598,744.08
72,182.34

250,507.92

229,408.20
336,518.40
401,421.00
474,608.04
586,778.46
746,511.48

Costo Q.

SAN MARCOS

(Actualizacin Gua de Costos 2,013)

49,403.62
1.028
384,550.13
657,525.25
954,794.06

11,260.71

411,719.14
1,160,038.38
1,672,152.00
2,177,366.71
2,239,701.54
237,713.69
203,398.02
248,426.48
313,661.30
603,440.11
72,748.48

252,472.69

231,207.48
339,157.76
404,569.40
478,330.46
591,380.64
752,366.47

Costo Q.

HUEHUETENANGO

COSTOS DE CONSTRUCCIN DE EDIFICIOS EDUCATIVOS

47,481.30
0.988
369,587.09
631,940.61
917,642.54

10,822.55

395,698.94
1,114,900.70
1,607,087.72
2,092,644.27
2,152,553.62
228,464.13
195,483.70
238,760.08
301,456.58
579,959.95
69,917.80

242,648.85

222,211.08
325,960.96
388,827.40
459,718.38
568,369.72
723,091.51

Costo Q.

BAJA VERAPAZ

Edificios FN de 1 nivel
Edificios EU de 2 niveles

48,538.58
1.01
377,816.76
646,012.16
938,075.88

11,063.54

404,510.05
1,139,726.42
1,642,873.07
2,139,241.61
2,200,484.98
233,551.39
199,836.58
244,076.60
308,169.18
592,874.04
71,474.67

248,051.96

227,159.10
333,219.20
397,485.50
469,955.02
581,025.73
739,192.74

Costo Q.

QUICH

48,538.58
1.01
377,816.76
646,012.16
938,075.88

11,063.54

404,510.05
1,139,726.42
1,642,873.07
2,139,241.61
2,200,484.98
233,551.39
199,836.58
244,076.60
308,169.18
592,874.04
71,474.67

248,051.96

227,159.10
333,219.20
397,485.50
469,955.02
581,025.73
739,192.74

Costo Q.

ALTA VERAPAZ

48,778.87
1.02
379,687.14
649,210.24
942,719.82

11,118.31

406,512.5
1,145,368.63
1,651,006.11
2,149,831.92
2,211,378.47
234,707.59
200,825.87
245,284.90
309,694.77
595,809.06
71,828.51

249,279.94

228,283.65
334,868.80
399,453.25
472,281.53
583,902.10
742,852.11

Costo Q.

PETN

244,368.02

223,785.45
328,270.40
391,582.25
462,975.49
572,396.64
728,214.63

Costo Q.

IZABAL

47,817.71
1.00
372,205.62
636,417.92
924,144.06

10,899.23

398,502.48
1,122,799.79
1,618,473.97
2,107,470.70
2,167,804.51
230,082.81
196,868.71
240,451.70
303,592.41
584,068.98
70,413.17

Construccin 2013

Fuente: MICIVI, Unidad de Construccin de Edificios del Estado -UCEE- Junio 2,013.

1
2
3

20

19

8
9
10
11
12
13
14
15
16
17
18

1
2
3
4
5
6

ESCUELAS PRIMARIA
Edificio FN-100
Edificio FN-110
Edificio FN-200
Edificio FN-210
Edificio FN-300
Edificio FN-310
Mdulo guardiana
y bodega GB-1
Edificio EU-09
Edificio EU-400
Edificio EU-600
Edificio EU-622
Edificio EU-800
Mdulo gradas MG-1
Mdulo gradas MG-2
Mdulo servicio sanitario SS-10D
Mdulo servicio sanitario SS-20D
Mdulo servicio sanitario SS-30
Mdulo letrina lavable LL-3
Fosa sptica; 1.00*3.50*1.85m,
Concreto
Pozo de absorcin, 15.00 m Prof.
ESCUELAS PREPRIMARIA
Edificio de prvulos PP-1
Edificio de prvulos PP-2
Edificio de prvulos PP-20

DESCRIPCIN

47,048.78
0.98
366,220.40
626,184.06
909,283.45

10,723.97

392,094.40
1,104,744.72
1,592,448.25
2,073,581.72
2,132,945.34
226,382.98
193,702.98
236,585.14
298,710.52
574,676.92
69,280.89

240,438.48

220,186.89
322,991.68
385,285.45
455,530.66
563,192.27
716,504.65

Costo Q.

ZACAPA

promedio de

No.

(Actualizacin Gua de Costos 2,013)

46,664.32
0.97
363,227.80
621,067.14
901,853.15

10,636.33

388,890.36
1,095,717.18
1,579,435.40
2,056,637.23
2,115,515.76
224,533.07
192,120.12
234,651.86
296,269.58
569,980.88
68,714.76

238,473.72

218,387.61
320,352.32
382,137.05
451,808.24
558,590.08
710,649.65

Costo Q.

CHIQUIMULA

COSTOS DE CONSTRUCCIN DE EDIFICIOS EDUCATIVOS

48,106.06
1.00
374,450.08
640,255.62
929,716.79

10,964.95

400,905.51
1,129,570.44
1,628,233.61
2,120,179.06
2,180,876.70
231,470.24
198,055.86
241,901.66
305,423.12
587,591.00
70,837.77

245,841.60

225,134.91
330,249.92
393,943.55
465,767.30
575,848.27
732,605.87

Costo Q.

JUTIAPA

Edificios FN de 1 nivel
Edificios EU de 2 niveles

46,375.97
0.97
360,983.34
617,229.44
896,280.42

10,570.61

386,487.33
1,088,946.53
1,569,675.76
2,043,928.87
2,102,443.57
223,145.64
190,932.97
233,201.90
294,438.87
566,458.86
68,290.16

237,000.14

217,038.15
318,372.80
379,775.75
449,016.43
555,138.45
706,258.41

Costo Q.

JALAPA

Gua sobre costos

Sistema Nacional de Inversin Pblica (SNIP)

22

COSTO DE CONSTRUCCIN DE EDIFICIOS EDUCATIVOS


No.

DESCRIPCIN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

ESCUELAS DE PRIMARIA
Edificio fFN-100
Edificio fFN-110
Edificio fFN-200
Edificio FN-210
Edificio FN-300
Edificio fFN-310
Mdulo guardiana y bodega GB-1
Edificio EU-09
Edificio EU-400
Edificio EU-600
Edificio EU-622
Edificio EU-800
Mdulo gradas MG-1
Mdulo gradas MG-2
Mdulo servicio sanitario SS-10d
Mdulo servicio sanitario SS-20d
Mdulo servicio sanitario SS-30
Mdulo letrina lavable LL-3
Fosa sptica; 1.00*3.50*1.85m, Concreto
Pozo de absorcin, 15.00 m Prof.

1
2
3

ESCUELAS DE PREPRIMARIA
Edificio de prvulos PP-1
Edificio de prvulos PP-2
Edificio de prvulos PP-20

PROMEDIO

233,006.76
341,797.12
407,717.80
482,052.87
595,982.83
758,221.46
254,437.46
414,923.18
1,169,065.91
1,685,164.85
2,194,311.20
2,257,131.13
239,563.60
204,980.89
250,359.76
316,102.25
608,136.14
73,314.61
11,348.34
49,788.09

215,688.69
316,393.28
377,414.45
446,224.62
551,686.81
701,867.17
235,526.56
384,084.30
1,082,175.88
1,559,916.11
2,031,220.50
2,089,371.38
221,758.20
189,745.82
231,751.94
292,608.16
562,936.84
67,865.55
10,504.89
46,087.62

373,140.00
638,016.00
926,465.00

387,542.74
662,642.18
962,224.37

358,738.88
613,391.74
890,707.69

Fuente: MICIVI, Unidad de Construccin de Edificios del Estado -UCEE- Junio 2,013.

Sistema Nacional de Inversin Pblica (SNIP)

MNIMO

224,347.00
329,095.00
392,565.00
464,138.00
573,834.00
730,044.00
244,981.00
399,503.00
1,125,620.00
1,622,540.00
2,112,765.00
2,173,251.00
230,660.00
197,362.00
241,055.00
304,355.00
585,536.00
70,589.00
10,926.00
47,937.00

Edificios FN de 1 nivel
Edificios EU de 2 niveles

23

MXIMO

ANEXO 5 COSTOS DE PUESTOS DE


SALUD Y CENTROS DE SALUD
COSTOS DE CONSTRUCCIN DE EDIFICIOS PARA SERVICIOS DE SALUD
(Actualizacin Gua 2,013)

1
2
3
4
5
6

No.

1
2
3
4
5
6

No.

1
2
3
4
5
6

SACATEPQUEZ

CHIMALTENANGO

DESCRIPCIN

COSTO Q.

COSTO Q.

COSTO Q.

COSTO Q.

857,700.00 852,500.00 855,000.00 852,000.00


Puesto de Salud
2,500,000.00 2,512,500.00 2,530,000.00 2,490,000.00
Centro de Salud
Centro de Atencin Permanente (CAP) 1,710,000.00 1,715,130.00 1,720,260.00 1,698,030.00
1,553,985.00 1,558,647.00 1,563,310.00 1,563,309.00
Centro de Atencin Integral (CAI)*
76,375.00
76,600.00
75,500.00
75,800.00
Centro de Urgencias Mdicas (CUM)
506,585.00 508,105.00 509,625.00 503,039,00
Centros de Convergencia
PROYECTO / DEPARTAMENTO

SAN MARCOS

HUEHUETENANGO

QUICH

BAJA VERAPAZ

DESCRIPCIN

COSTO Q.

COSTO Q.

COSTO Q.

COSTO Q.

870,500.00 876,500.00 851,700.00 848,300.00


Puesto de Salud
2,540,000.00 2,552,500.00 2,497,500.00 2,490,000.00
Centro de Salud
Centro de Atencin Permanente (CAP) 1,735,650.00 1,747,620.00 1,698,030.00 1,691,190.00
1,543,108.00 1,577,295.00 1,588,173.00 1,543,108.00
Centro de Atencin Integral (CAI)*
77,500.00
78,000.00
75,800.00
75,500.00
Centro de Urgencias Mdicas (CUM)
514,184.00 517,730.00 503,039.00 501,013.00
Centros de Convergencia
PROYECTO / DEPARTAMENTO

ESCUINTLA

SANTA ROSA

SOLOL

TOTONICAPN

DESCRIPCIN

COSTO Q.

COSTO Q.

COSTO Q.

COSTO Q.

Construccin 2013

1
2
3
4
5
6

EL PROGRESO

promedio de

No.

GUATEMALA

Gua sobre costos

No.

PROYECTO / DEPARTAMENTO

858,500.00 858,500.00 879,100.00 875,700.00


Puesto de Salud
2,507,500.00 2,510,000.00 2,560,000.00 2,552,500.00
Centro de Salud
Centro de Atencin Permanente (CAP) 1,711,710.00 1,711,710.00 1,752,750.00 1,745,910.00
1,536,892.00 1,555,540.00 1,560,200.00 1,560,200.00
Centro de Atencin Integral (CAI)*
76,450.00
76,450.00
78,300.00
78,000.00
Centro de Urgencias Mdicas (CUM)
507,092.00 507,092.00 519,250.00 517,223.00
Centros de Convergencia
PROYECTO / DEPARTAMENTO

ALTA VERAPAZ

PETN

IZABAL

ZACAPA

DESCRIPCIN

COSTO Q.

COSTO Q.

COSTO Q.

COSTO Q.

861,150.00 863,700.00 852,500.00 846,500.00


Puesto de Salud
2,517,500.00 2,522,500.00 2,492,500.00 2,475,000.00
Centro de Salud
Centro de Atencin Permanente (CAP) 1,716,840.00 1,721,970.00 1,700,000.00 1,687,770.00
1,560,200.00 1,564,865.00 1,544,660.00 1,533,785.00
Centro de Atencin Integral (CAI)*
76,700.00
76,900.00
75,900.00
75,400.00
Centro de Urgencias Mdicas (CUM)
508,611.00 510,131.00 503,546.00 500,000.00
Centros de Convergencia

Sistema Nacional de Inversin Pblica (SNIP)

24

No.

1
2
3
4
5
6

No.

1
2
3
4
5
6

No.

1
2
3
4
5
6

PROYECTO / DEPARTAMENTO

QUETZALTENANGO

SUCHITEPQUEZ

RETALHULEU

CHIQUIMULA

DESCRIPCIN

COSTO Q.

COSTO Q.

COSTO Q.

COSTO Q.

868,400.00 850,000.00 830,300.00 842,300.00


Puesto de Salud
2,532,500.00 2,482,500.00 2,492,500.00 2,495,000.00
Centro de Salud
Centro de Atencin Permanente (CAP) 1,732,230.00 1,694,610.00 1,655,280.00 1,679,220.00
1,574,185.00 1,540,000.00 1,504,260.00 1,526,015.00
Centro de Atencin Integral (CAI)*
77,400.00
75,700.00
74,000.00
75,000.00
Centro de Urgencias Mdicas (CUM)
513,171.00 502,026.00 490,374.00 497,467.00
Centros de Convergencia
PROYECTO / DEPARTAMENTO

JALAPA

JUTIAPA

DESCRIPCIN

COSTO Q.

COSTO Q.

834,500.00 859,450.00
Puesto de Salud
2,445,000.00 2,512,500.00
Centro de Salud
Centro de Atencin Permanente (CAP) 1,663,830.00 1,713,420.00
1,512,030.00 1,557,095.00
Centro de Atencin Integral (CAI)*
74,300.00
76,500.00
Centro de Urgencias Mdicas (CUM)
492,907.00 507,598.00
Centros de Convergencia
PROYECTO / DEPARTAMENTO

PROMEDIO

DESCRIPCIN

COSTO Q.

MXIMO
COSTO Q.

COSTO Q.

854,700.00 879,100.00 830,300.00


Puesto de Salud
2,502,500.00 2,560,000.00 2,445,000.00
Centro de Salud
Centro de Atencin Permanente (CAP) 1,704,015.00 1,752,750.00 1,655,280.00
1,548,547.00 1,592,835.00 1,504,260.00
Centro de Atencin Integral (CAI)*
76,150.00
78,300.00
74,000.00
Centro de Urgencias Mdicas (CUM)
504,812.00 519,250.00 490,374.00
Centros de Convergencia

Base: Estimacin de costos, Unidad de Planificacin Estratgica.


(UPE), Ministerio de Salud Publica Y Asistencia Social. Junio 2013. * FONAPAZ (CAI)

25

MNIMO

Sistema Nacional de Inversin Pblica (SNIP)

ANEXO 6 COSTOS UNITARIOS PROYECTOS


DE ALCANTARILLADO
COSTOS DE CONSTRUCCIN DE EDIFICIOS PARA SERVICIOS DE SALUD
(Actualizacin Gua 2,013)
U
U
U
U
U
U
U
U
U
U
U
U
M
M
M
M
M
M
M
U
U
M
U
M
M2
M2
M2
M
M
M
M
M
M
M

COSTO UNITARIO Q.

7,200.00
15,600.00
35,400.00
329,613.00
2,200.00
15,655.00
27,050.00
43,800.00
79,700.00
58,775.00
100,925.00
119,900.00
175.00
250.00
420.00
655.00
835.00
1,250.00
2,050.00
5,400.00
1,800.00
3,030.00
4,850.00
775.00
410.00
165.00
275.00
90.00
195.00
385.00
1,090.00
320.00
1,325.00
1,300.00

Sistema Nacional de Inversin Pblica (SNIP)

Construccin 2013

Pozo de visita 1.20 m. h =(1.40 a 2.00 m)


Pozo de visita 1.20 m. h =(2.01 a 4.00 m)
Pozo de visita 1.20 m. h =(4.01 a 6.00 m)
Pozo de visita 1.20 m. h =(6.01 a 8.00 m)
Caida mayor a 0.70 m.
Pozo de visita 1.50 m. h =(1.40 a 2.00 m)
Pozo de visita 1.50 m. h =(2.01 a 4.00 m)
Pozo de visita 1.50 m. h =(4.010 a 6.00 m)
Pozo de visita 1.50 m. h =(6.01 a 8.00 m)
Pozo de visita 2.00 m. h =(4.01 a 6.00 m)
Pozo de visita 2.00 m. h =(6.01 a 8.00 m)
Pozo de visita 2.00 m. h =(8.0110.00 m)
Tuberia + accesorios PVC 4" Norma ASTM D3034 instalada
Tuberia + accesorios PVC 6" Norma ASTM D3034 instalada
Tuberia + accesorios PVC 8" Norma ASTM D3034 instalada
Tuberia + accesorios PVC 10" Norma ASTM D3034 instalada
Tuberia + accesorios PVC 12" Norma ASTM D3034 instalada
Tuberia + accesorios PVC 15" Norma ASTM D3034 instalada
Tuberia + accesorios PVC 18" Norma ASTM D3034 instalada
Caja para alcantarillado
Conexin domiciliar
Rejilla
Tragante de acera
Reposicin de pavimento asfaltico
Reposicin de pavimento rigido (concreto)
Reposicin de empedrado
Reposicin de adoquin
Tuberia + accesorios PVC 2" Norma ASTM D2241 instalada
Tuberia + accesorios PVC 3" Norma ASTM D2241 instalada
Tuberia + accesorios PVC 6" Norma ASTM D2241 instalada
Tuberia + accesorios PVC 8" Norma ASTM D2241 instalada
Tuberia + accesorios PVC 10" Norma ASTM F949 instalada
Tuberia + accesorios PVC 24" Norma ASTM F949 instalada
Tuberia + accesorios HG 6" Cedula 40 instalada

UNIDAD

promedio de

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

RENGLN

Gua sobre costos

No.

26

No.

35
36
37
38
39
40
41
42
43

RENGLN

UNIDAD

Cabezal descarga concreto ciclopeo para tuberia 36" PVC F-949


Cabezal descarga concreto ciclopeo para tuberia 45" PVC F-949
Tuberia + accesorios PVC 21" Norma ASTM F2307 instalada
Tuberia + accesorios PVC 27" Norma ASTM F2307 instalada
Tuberia + accesorios PVC 30" Norma ASTM F2307 instalada
Tuberia + accesorios PVC 33" Norma ASTM F2307 instalada
Tuberia + accesorios PVC 39" Norma ASTM F2307 instalada
Tuberia + accesorios PVC 42" Norma ASTM F2307 instalada
Tuberia + accesorios PVC 45" Norma ASTM F2307 instalada

U
U
M
M
M
M
M
M
M

COSTO UNITARIO Q.

24,530.00
37,600.00
1,200.00
2,555.00
2,760.00
3,255.00
3,790.00
4,000.00
4,560.00

Fuente: INFOM, Unidad de Estudios Tcnicos, rea de Presupuestos.

COSTOS UNITARIOS PROYECTOS ANEXO 7


DE CAMINOS
PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS
(Actualizacin Gua 2,013)
REHABILITACION Y MEJORAMIENTO DE CARRETERAS
RENGLN

27

DESCRIPCIN

UNIDAD

COSTO UNITARIO Q.

105.06
110.12

Planos finales de la obra construida


Trabajos por Administracin
TERRACERIA

Hojas
Global

1,656.37 Q.
---

201.03 (a)
201.03 ( c ) 2
201.03 ( c ) 3
201.04
202.02
203.03(a)
203.03(b)
203.03(c)
203.04(g))
203.03(d)
203.04(h)
203.03( e )
204.01
204.01(a)

Retiro de casas o edificios


Retiro de alcantarillas existentes
Retiro de Otras Estructuras
Retiro de servicios existentes
Limpia chapeo y destronque
Excavacin no clasificada
Excavacin no clasificada de material de desperdicio
Excavacin no clasificada para prstamo
Excavacin en roca para material de desperdicio
Remocin de material inapropiado
Excavacin de contra cunetas
Remocin y prevencin de derrumbes
Excavacin de canales varios
Excavacin de canales en la entrada y salida de alcantarillas

Global
ml
Global
Global
Ha
m3
m3
m3
m3
m3
m3
m3
m3
m3

--Q 56.57
----Q 37,443.82
Q 45.22
Q 45.21
Q 53.25
Q 166.05
Q 48.63
Q 213.16
Q 52.42
Q 204.69
Q 204.70

Sistema Nacional de Inversin Pblica (SNIP)

205.05
205.06
205.07
205.12
208.06

Excavacin estructural para cimentacin de cajas y cabezales


de alcantarillas
Excavacin estructural para alcantarillas
Excavacin estructural para sub-drenaje
Relleno estructural
Acarreo

m3

Q 200.63

m3
m3
m3
m3-km

Q 171.52
Q 133.95
Q 225.79
Q 6.42

Gua sobre costos

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS


(Actualizacin Gua 2,013)
REHABILITACION Y MEJORAMIENTO DE CARRETERAS
DRENAJE MENOR
RENGLN

603.01(a)(24")

603.01(a)(36")
603.01(a)(42")
603.01(a)(48")
603.01(a)(60")

205.05(a)(1)
205.05(a)(2)
204.01
205.11(a)
553.03(a) 21
555.01
552.01
251.01

COSTO UNITARIO Q.

Alcantarilla de concreto reforzado de 24" de dimetro


Alcantarilla de concreto reforzado de 30" de dimetro
Alcantarilla de concreto reforzado de 36" de dimetro
Alcantarilla de concreto reforzado de 48" de dimetro
Alcantarilla de concreto reforzado de 60" de dimetro
Alcantarilla de metal corrugado anidable de 24" de
dimetro cal 16
Alcantarilla de metal corrugado anidable de 30" de
dimetro cal 16
Alcantarilla de metal corrugado anidable de 36" de
dimetro cal 16
Alcantarilla de metal corrugado anidable de 42" de
dimetro cal 16
Alcantarilla de metal corrugado anidable de 48" de
dimetro cal 16
Alcantarilla de metal corrugado anidable de 60" de
dimetro cal 14
DRENAJE MAYOR BOVEDAS
Excavacin estructural para cimentacin de estructuras, (Bvedas)
en lecho rocoso
Excavacin estructural para cimentacin de estructuras, (Bvedas)
Excavacin de canales
Relleno estructural para cimentacin de estructuras (Bvedas)
Concreto clase 3,000 (210)
Concreto ciclpeo
Acero de refuerzo
Zampeado de piedra con mortero

m
m
m
m
m

Q 1,115.83
Q 1,600.13
Q 2,067.78
Q 3,485.39
Q 5,793.38

Q 1,417.63

Q 1,585.77

Q 1,739.12

Q 2,078.85

Q 2,540.01

Q 4,291.48

m3

Q 261.72

m3
m3
m3
m3
m3
kg.
m2

Q 203.26
Q 200.63
Q 263.08
Q 5,139.87
Q 2,052.66
Q 35.51
Q 198.88

Construccin 2013

603.01(a)(30")

UNIDAD

promedio de

601.01 (24")
601.01 (30")
601.01 (36")
601.01 (48")
601.01 (60")

DESCRIPCIN

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

Sistema Nacional de Inversin Pblica (SNIP)

28

PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS


(Actualizacin Gua 2,013)
REHABILITACION Y MEJORAMIENTO DE CARRETERAS
DRENAJE MAYOR PUENTES
RENGLN

DESCRIPCIN

Excavacin estructural para cimentacin de estructuras (puentes)


en lecho rocoso
205.05(a)(2) Excavacin estructural para cimentacin de estructuras (puentes)
205.11(b)
Relleno estructural para cimentacin de estructuras (puentes)
553.03(a) 35 Concreto clase 5,000 PSI (350)
553.03(a) 28 Concreto clase 4,000 PSI ( 280)
553.03(a) 21 Concreto clase 3,000 PSI (210)
552.01
Acero de refuerzo (grado 40)
554.04(a)
Acero de pre esfuerzo
552.03(f)50 Acero estructural (grado 50)
552.03(f)30 Acero estructural (grado 30)
561.03 ( c )
Almohadillas elastomricas
602.03( c ) 4" Tubo de hierro galvanizado de 4"de dimetro
205.05(b)(1)

RENGLONES VARIOS
Gaviones
Tela geotextil (suministro y colocacin)
Sub drenajes Tubera de concreto perforada 8" dimetro
Agregado fino para filtro de sub-drenaje
Agregado grueso para filtro de sub-drenaje
Cajas y cabezales de alcantarillas, de concreto ciclpeo
Cunetas revestidas de concreto simple (2,000 psi) fundido en
608.04
sitio de 7 cms de espesor
553.03(a) 17.5 Concreto clase 2,500 (175) (Cortinas y cajas de transicin)
609.01
Bordillos de concreto simple
709.01
Separadores de carril de concreto, sum. y colocacin
110.12
Trabajos varios por administracin
256
Anclajes permanentes 4" de dimetro y 4.50 ml
258
Muros de suelo enclavado (anclajes de 4.5 ml @ 2.00 m.)
259
Concreto lanzado
253.03(a)
253.03(f)
605.03(a)
605.03(h)1
605.03(h)2
607.01

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

29

Sistema Nacional de Inversin Pblica (SNIP)

UNIDAD

COSTO UNITARIO Q.

m3

m3
m3
m3
m3
m3
Kg
Kg
Kg
kg
dm3
m

Q 203.26
Q 263.11
Q 6,002.66
Q 4,851.11
Q 4,299.91
Q
37.41
Q 152.68
Q 137.24
Q 125.61
Q 1,327.21
Q 676.21

m3
m2
m
m
m3
m3

Q 1,140.71
Q
53.76
Q 127.15
Q 254.26
Q 414.36
Q 2,155.84

m2

194.70

m3
m
u
global
u
m2
m3

Q
Q
Q
Q
Q
Q
Q

3,102.80
143.04
3,199.28
1,160.01
1,924.08
1,217.17
4,413.12

261.69

PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS


(Actualizacin Gua 2,013)
REHABILITACION Y MEJORAMIENTO DE CARRETERAS
PAVIMENTO
RENGLN

208.06(2)
311
501.01

707.04(b)SR
707.04(b)SP
707.04(b)LS
707.04(b)LD
707.04(b)IP
760.3(f)

DISPOSITIVOS PARA CONTROL DE TRFICO


Defensas metlicas para carreteras
Cerco de alambre de pas
Monumentos de kilometraje, suministro y colocacin
Postes delineadores suministro y colocacin
Pintura termoplstica para lnea central
Pintura termoplstica para lnea no central (por lnea)
Seales de trfico restrictivas de metal (SR) un tablero,
suministro y colocacin
Seales de trfico preventivas de metal, (SP) un tablero
suministro y colocacin
Seales de trfico informativas laterales simples de metal,
(SII, SIR) suministro y colocacin, un tablero
Seales de trfico informativas laterales dobles de metal,
(SID) suministro y colocacin
Seales de trfico indicadoras del proyecto, suministro y
colocacin (SIG)
Dispositivos para sealizacin nocturna, suministro y
colocacin

Q
10.37
Q 161.73
Q 2,292.22
Q 319.86
Q
2.70
Q
46.56
Q 440.91
Q
40.75
Q
35.51
Q

6.46

Q
2.94
Q
13.48
Q 2,077.47

m
m
U
U
km
km

Q
527.80
Q
63.34
Q
893.20
Q
730.80
Q 21,404.32
Q 21,404.32

Q 1,921.35

Q 1,906.90

Q 2,682.52

Q 3,842.55

Q 14,616.00

Construccin 2013

701.05
703.04 (a)
704.01
705.01
706.03(c)
706.03(c)1

Reacondicionamiento de sub-rasante (20 cms)


m2
Capa de sub-base granular
m3
Mezcla asfltica para relleno de baches y sellado de grietas
m3
Capa de base con material triturado (sin acarreo)
m3
Cemento para estabilizar base
kg
Riego de imprimacin (incluye secante)
GLS.
Concreto asfltico en caliente (sin acarreo)
Ton-M
Material bituminoso para concreto asfltico
Gls
Riego de liga
Gls.
Acarreo de piedra y material triturado para base y concreto
m3-km
asfltico en camin
Acarreo de concreto asfltico en camin
Ton-M/km
Fresado e = 5 centmetros (sin acarreo)
m2
Concreto Hidrulico (4,000 PSI)
m3

COSTO UNITARIO Q.

promedio de

208.06(1)

UNIDAD

Gua sobre costos

301
304.01(a)
401.01 (a)
304.01(b)
308.19(b)
407.01
401.01
401.21( c )
408.01

DESCRIPCIN

34.08

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

Sistema Nacional de Inversin Pblica (SNIP)

30

PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS


(Actualizacin Gua 2,013)
REHABILITACION Y MEJORAMIENTO DE CARRETERAS
MITIGACIN AMBIENTAL
RENGLN

ETE-1
ETE-2
ETE-3
ETE-4
ETE-5
ETE-6
ETE-7
ETE-8
ETE-9
ETE-10
Co 302
Co 302
Co 303
Co 304.1.02.02
Co 304.1.02.03
Co 304.1.02.03 (b)

Co 308
Az 401.01
Co 401.01 (a)
Az 401.20 (c)
Az 411.01
208.06(2)
Co 306

DESCRIPCIN

Especialista Ambiental
mes
Siembra de csped
Ha
Siembra de arbustos
Unidad
Mantenimiento de csped
m2
Mantenimiento estabilizacin de arbustos
Unidad
Siembra de rboles de compensacin
rbol
Mantenimiento de estabilizacin de rboles de compensacin rbol
Reforestacin de bancos
rbol
Re vegetacin de taludes de relleno
rbol
Re vegetacin de botaderos de material de desperdicio
m2
MANTENIMIENTO RED VIAL PAVIMENTADA
Fabricacin Concreto Asfltico en Fri con mezcladoras (Bacheo) Ton-M
Fabricacin Concreto Asfltico en Fri en planta (Bacheo)
Ton-M
Fabricacin Concreto Asfltico en Caliente (Bacheo)
Ton-M
Relleno con material de Base en labores de bacheo
m3
Colocacin de nueva carpeta de concreto asfltico en labores
m3
de bacheo (Bacheo)
m3
Bacheo en Carreteras Pavimentadas NOCTURNO
Riego de imprimacin con emulsin (incluye secante) (Bacheo) GLS.
Concreto asfltico en caliente (sin acarreo)
Ton-M
Concreto asfltico en caliente para asfalto modificado (sin
Ton-M
acarreo)
Material bituminoso para concreto asfltico y base negra
Gls
Material bituminoso con polmero modificador al 1.5% del
Gls
peso del asfalto
Ton-M/km
Acarreo de concreto asfltico y base negra en camin
Escarificacin, Conformacin, Compactacin del Pavimento
m2
Existente (Bacheo)

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

31

UNIDAD

Sistema Nacional de Inversin Pblica (SNIP)

COSTO UNITARIO Q.

Q 20,300.00
Q 464,611.88
Q
38.14
Q
31.21
Q
20.80
Q
38.14
Q
20.80
Q
38.14
Q
38.14
Q
26.00
Q 814.47
Q 821.62
Q 1,026.66
Q 276.98
Q 2,578.64
Q 3,238.87
Q
46.56
Q
435.15
Q

457.12

40.75

49.86

2.94

10.37

PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS


(Actualizacin Gua 2,013)
REHABILITACION Y MEJORAMIENTO DE CARRETERAS
MANTENIMIENTO RED VIAL PAVIMENTADA
RENGLN

Co 307.02 (a)

Co 310
Co 311.05.1
Co 311.05.2
Co 313

3.17.b

Az. 203.03(a).Esp

Az. 203.03(b).Esp

Az. 203.03.(c).Esp
Az. 206.04
Az. 208.02
Co 203.03.01
Co 203.03.02

Co 203.03.03
Az. 304.01(b)

Q 648.03

Q 909.93
Q 35.51
Q 927.27
Q 46.80
Q 35.45
Q 13.65
Q 13.65
Q 195.80
Q 194.72
Q 443.66
Q 15.26

Construccin 2013

Az 309.19b
Co 301.01

m3
Estabilizacin y Recuperacin c/Emulsin Pav.Existente,
2% AC (Bacheo)
Estabilizacin y Recuperacin Pav.Existente con asfalto
m3
espumado, 3.25% AC (Bacheo)
Gal
Riego de Liga con emulsin (Bacheo)
m3
Material Ptreo para Tratamientos Superficiales (Bacheo)
Material Bituminoso para Tratamientos Superficiales
Gal
(Bacheo)
Microsurfacing e = 1.5 cms, 3% cemento, 8% emulsin
m2
(Bacheo)
m2
Fresado e = 5 centmetros (sin acarreo) (Bacheo)
m2
Fresado e = 5 centmetros (sin acarreo) (Bacheo)
m2
Cunetas Revestidas (Piedra Ligada con Mortero) (Bacheo)
Cunetas Revestidas (Concreto Simple Fundido en Sitio)
m2
(Bacheo)
Ton-M
Capa de Base Negra colocada, sin acarreo (Bacheo)
ml
Sello de Fisuras y Grietas en Pavimentos Asflticos (Bacheo)
MANTENIMIENTO RED VIAL NO PAVIMENTADA
Excavacin NO Clasificada (Volumen < a 5,000 m)
m3
(Terracera)
Excavacin NO Clasificada para Desperdicio (Volumen
m3
< a 5,000 m) (Terracera)
Excavacin NO Clasificada para Prstamo (Volumen < a
m3
5,000 m) (Terracera)
Relleno para estructuras (Terracera)
m3
Acarreo (Terracera)
m3/km
Limpieza de Alcantarillas y Est. Dren. Menor, en Carret.
ml
No Pavimentadas (Seccin Cuarto) (Terracera)
Limpieza de Alcantarillas y Est. Dren. Menor, en Carret.
ml
No Pavimentadas (Seccin Llena) (Terracera)
Limpieza de Alcantarillas y Est. Dren. Menor, en Carret.
ml
No Pavimentadas (Sesin Media) (Terracera)
Capa de base con material triturado (sin acarreo) (Terracera)
m3

COSTO UNITARIO Q.

promedio de

311
311
3.17.a

UNIDAD

Gua sobre costos

Co 307.02 (b)

DESCRIPCIN

Q 50.04

Q 50.04
Q 58.49
Q 225.73
Q 6.46
Q 23.68
Q 114.80
Q 36.37
Q 319.86

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

Sistema Nacional de Inversin Pblica (SNIP)

32

PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS


(Actualizacin Gua 2,013)
REHABILITACION Y MEJORAMIENTO DE CARRETERAS
MANTENIMIENTO RED VIAL NO PAVIMENTADA
RENGLN

Co 201

Co 202
Co 2.04
Co 205
Co 206
Co 207
Co 208.02.2 (30")
Co 208.02.3 (30")
Co 208.02.2 (36")
Co 208.02.2 (42")

Co 208.02.2 (48")

Co 208.02.2 (60")

Co 208.02.2 (84")

Co 208.02.2 (120")
Co 208.06
Co 209
Co 210
Co 211

DESCRIPCIN

UNIDAD

Limpieza del Derecho de Va, reconformacin de cunetas y


derrumbes menores (Terracera)
Bacheo Manual en Terracera (Terracera)
Perfilado (Terracera)
Reparacin de Zonas Inestables (Vaciado), en Carret. No
Pavimentadas (Terracera)
Conformacin de la Superficie de Rodamiento (Terracera)
Reposicin capa de Balasto colocado y compactado (Terracera)
Suministro Provisin y Colocacin de Alcantarillas ( 30")
- Metlica - (Terracera)
Suministro Provisin y Colocacin de Alcantarillas PVC (
30") (Terracera)
Suministro Provisin y Colocacin de Alcantarillas ( 36")
- Metlica - (Terracera)
Suministro Provisin y Colocacin de Alcantarillas ( 42")
- Metlica - (Terracera)
Suministro Provisin y Colocacin de Alcantarillas ( 48")
- Metlica - (Terracera)
Suministro Provisin y Colocacin de Alcantarillas ( 60")
- Metlica - (Terracera)
Suministro Provisin y Colocacin de Alcantarillas ( 84")
- Metlica - (Terracera)
Suministro Provisin y Colocacin de Alcantarillas ( 120")
- Metlica - (Terracera)
Carga, Descarga y Traslado de Tubos de H A - (Terracera)
Carrileras de Concreto Hidrulico e=0.15 m. - (Terracera)
Tratamiento de Caminos con Estabilizadores Orgnicos e
Imprimacin - (Terracera)
Estabilizacin con emulsin (2% AC), de la Terracera Existente
e = 15 cms. - (Terracera)

m2

1.59

m3
m2

Q
Q

166.02
1.06

m3

192.97

m2
m3

Q
Q

2.48
139.95

ml

Q 1,585.77

ml

Q 2,163.85

ml

Q 1,739.12

ml

Q 2,078.85

ml

Q 2,540.01

ml

Q 4,291.48

ml

Q 6,665.47

ml

Q 9,886.30

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

33

Sistema Nacional de Inversin Pblica (SNIP)

COSTO UNITARIO Q.

ml/km Q
m2
Q

0.17
272.43

m2

30.35

m2

85.88

PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS


(Actualizacin Gua 2,013)
REHABILITACION Y MEJORAMIENTO DE CARRETERAS
MANTENIMIENTO RED VIAL NO PAVIMENTADA
RENGLN

Co 211

Co 401.02
Co 402.01

Estabilizacin con emulsin (2% AC), de la Terracera


Existente e = 15 cms. - (Terracera)
Estabilizacin de Subrasante existente con piedra de 3" (Terracera)
Gaviones - (Terracera)
Mampostera - (Terracera)

COSTO UNITARIO Q.

Q 85.88

m3

Q 116.80

m3
m3

Q 1,140.71
Q 1,728.20

m3
m3
m3
m3
m3

Q 43.26
Q 1,420.81
Q 2,276.93
Q 1,428.18
Q 1,413.30

ml
ml

Q 6,577.15
Q
880.31

ml

Q 6,956.07

ml

Q 5,283.37

Unidad

Q 1,067.49

m2

452.27

ml
m2
Unidad
ml
Global
Pie L
Pie L
Pie L
m2
Global

Q
Q
Q
Q
Q
Q
Q
Q
Q
--

4,901.91
2,772.24
3,555.62
2,806.26
17,419.74
2,461.58
1,430.03
2,151.69
2,070.24

Construccin 2013

m2

promedio de

DRAGADOS DE CANALES Y RIOS


Co 701.03
Dragado sin acarreo (Dragados)
Co 701.05 (a) Construccin de Espigones, con gaviones (Dragados)
Co 701.05 (b) Construccin de Espigones, de concreto (Dragados)
Co 701.06
Construccin de Diques (Dragados)
Co 707.07
Proteccin de Bordas con Gaviones (Dragados)
MANTENIMIENTO DE PUENTES
Co 501.01
Mantenimiento de Puentes de Metal
Co 502.01
Mantenimiento de Puentes de Concreto
Mantenimiento de Puentes de Estructura Metlica con
Co 503.01
Embreizado Superior e Inferior
Mantenimiento de Puentes de Estructura Metlica sin
Co 504.01
Embreizado de Piso a Travs
Mantenimiento de Remates de Puentes
Co 505.01
Mantenimiento de Vigas de Metal de Puentes de los Puentes
Co 506.01
de Concreto
Reparacin de Juntas de Puentes
Co 507.01
Reparacin de Losas
Co 508.01
Reparacin de Remates de Puentes
Co 509.01
Reparacin de Barandales de Puentes
Co 510.01
Sealizacin
Co 511.01
Mantenimiento de Puentes Bailey
Co 512.01
Limpieza de Puente Bailey
Co 513.01
Pintura de Puente Bailey
Co 514.01
Piso de Puente Bailey (madera)
Co 515.01
Trabajos por Administracin
Co 525

UNIDAD

Gua sobre costos

Co 213

DESCRIPCIN

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

Sistema Nacional de Inversin Pblica (SNIP)

34

PRINCIPALES RENGLONES PARA TRABAJOS EN CARRETERAS


(Actualizacin Gua de Costos 2013)
REHABILITACIN Y MEJORAMIENTO DE CARRETERAS
MANTENIMIENTO DE SEALIZACIN Y DEFENSAS METALICAS
RENGLN

Co 6.01.05
Co 6.01.06
Co 6.03.01
Co 6.03.02
Co 6.03.03
Co 6.03.04
Co 6.03.05
Co 6.03.06
Co 6.03.07
Co 6.03.08
Co 6.03.09
Co 6.03.10
Co 6.03.11
Co 6.03.12
Co 6.03.13

DESCRIPCIN

Sealizacin Horizontal en Frio


Sealizacin Horizontal en Caliente
Vigas de Defensa Metlica tipo W
Vigas de Defensa Metlica tipo TRIPLE
Terminales de Defensa Metlica tipo W
Terminales de Defensa Metlica tipo TRIPLE
Postes para Defensa metlica tipo "W"
Postes para Defensa metlica tipo TRIPLE
Juego de 10 Tornillos, 10 tuercas y 20 roldanas
Vialetas de lmina galvanizada con sello
Remocin y reinstalacin de vigas daadas
Remocin y reinstalacin de postes daados
Separador de defensa metlica tipo "W"
Separador de defensa metlica tipo TRIPLE
Reductor de Defensas Metlicas tipo Triple

Fuente: MICIVI/COVIAL, Cmara Guatemalteca de la Construccin Diciembre 2012.

35

Sistema Nacional de Inversin Pblica (SNIP)

UNIDAD

COSTO UNITARIO Q.

ml
ml
ml
ml
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
ml
Unidad
Unidad
Unidad
Unidad

Q
11.08
Q
15.08
Q 1,626.67
Q 2,544.23
Q 609.00
Q 941.92
Q 1,164.51
Q 1,401.90
Q
63.34
Q
65.20
Q 291.56
Q 331.43
Q 208.56
Q 221.35
Q 1,821.81

ANEXO 8 COSTOS UNITARIOS DE PUENTES


PUENTE VEHICULAR TIPO PRONTO 11 m 22 m (Longitud)
(Actualizacin Gua de Costos 2013)
DESCRIPCIN

44.50
382.50
442.00
4,077.32
5,730.83
600.00
570.00
540.00
600.00
620.00
620.00
620.00
620.00
620.00
620.00
200.00
330.00
590.00
495.00
225.00
2,282.00
1,600.00
135.00
495.00
215.00
436.00
215.00
155.00
1,600.00
1,055.00
1,410.00
2,485.00
2,682.50

Construccin 2013

M2
M
M3
M3
M3
qq
qq
qq
qq
qq
qq
qq
qq
qq
qq
m2
m
m
m
Dm3
unidad
unidad
Kg
m2
m3
m3
m3
m2
m3
unidad
unidad
unidad
unidad

promedio de

COSTO UNITARIO Q.

Gua sobre costos

Acondicionamiento de terreno
Trazo y nivelacin
Excavacin
Concreto 3000 PSI
Concreto 5000 PSI
Acero estructural N0. 2
Acero estructural N0. 3
Acero estructural N0. 4
Acero estructural N0. 5
Acero estructural N0. 6
Acero estructural N0. 7
Acero estructural N0. 8
Acero estructural N0. 9
Acero estructural N0. 10
Acero estructural N0. 11
Acabados puente prefabricado pronto
Tubo HG 2"puente vehicular 20m fundido in situ
Drenaje PVC 4" puente vehicular 20m fundido in situ
Drenaje HG 4" Puente vehicular 20m fundido in situ
Neopreno puente vehicular 20m fundido in situ
Anclajes de viga estructural
Junta estructural
Acero de preesfuerzo
Formaleteado puente prefabricado pronto
Relleno compacto con selecto
Material filtrante para puentes
Volumen de selecto
Empedrado caminos (esp. 20 cm)
Muro concreto ciclpeo puente 20m fundido en situ
Muro gavin (caja 2x1x1)
Muro gavin (caja 2x1x0.50
Muro gavin (colchn de 4x2x0.30)
Rtulo

UNIDAD

Base: Especificaciones Direccin General de Caminos -DGC- Junio 2,013.

Sistema Nacional de Inversin Pblica (SNIP)

36

PUENTE COLGANTE (PEATONAL DE HAMACA)


(Actualizacin Gua de Costos 2013)
DESCRIPCIN

Acondicionamiento de terreno
Trazo y nivelacin
Excavacin estructural
Concreto ciclpeo
Torres de apoyo
Acero estructural N0. 3
Acero estructural N0. 4
Acero estructural N0. 8
Acero estructural N0.11
Tubo HG 2"
Relleno compacto con selecto
Empedrado natural
Rampas de acceso
Tensado de cables
Barandal
Cable principal 1"
Cable principal 1 1/2"
Formaleteado
Flete
Acarreo
Rtulo
Base: Especificaciones Direccin General de Caminos -DGC- Junio 2,013.

37

Sistema Nacional de Inversin Pblica (SNIP)

UNIDAD

COSTO UNITARIO Q.

M2
M
M3
M3
M3
qq
qq
qq
qq
m
m3
m2
m2
unidad
m
m
m
m2
k/qq
m3/km
unidad

44.50
382.50
442.00
1,580.00
2,115.00
570.00
540.00
620.00
620.00
330.00
263.11
155.00
397.45
875.00
278.00
1,635.00
2,755.00
4.80
0.30
7.78
2,682.52

PUENTE VEHICULAR POST TENSADO


(Actualizacin Gua de Costos 2013)
DESCRIPCIN

44.50
382.50
442.00
7.78
4,077.30
5,730.00
600.00
570.00
540.00
600.00
620.00
620.00
620.00
620.00
620.00
620.00
225.00
2,282.00
1,600.00
495.00
215.00
3,000.00
330.00
495.00
590.00
1,395.00
200.00
436.00
1,055.00
1,410.00
2,485.00
155.00
165.00
192.00
1,400.00
5,830.00

Construccin 2013

m
m
m
m-Km
m
m
qq
qq
qq
qq
qq
qq
qq
qq
qq
qq
Dm
unidad
unidad
m
m
m
m
m
m
unidad
m
m
unidad
unidad
unidad
m
m
Kg
m
m

promedio de

COSTO UNITARIO Q.

Gua sobre costos

Acondicionamiento de terreno
Trazo y nivelacin
Excavacin
Acarreo
Concreto 3,000 PSI
Concreto 5,000 PSI
Acero estructural No 2
Acero estructural No 3
Acero estructural No 4
Acero estructural No 5
Acero estructural No 6
Acero estructural No 7
Acero estructural No 8
Acero estructural No 9
Acero estructural No 10
Acero estructural No 11
Neopreno para puente vehicular
Anclajes de viga estructural
Juntas estructurales
Formaleteado
Relleno compactado con selecto
Concreto ciclpeo
Tubo HG 2
Tubo HG 4
Tubo PVC 4
Tubo PVC 6
Acabados
Material filtrante para puentes
Muro de gavin, 1 metro cbico
Muro de gavin, 2 metros cbicos
Colchn reno para muro de gavin
Empedrado de rampas de acceso
Cunetas revestidas
Acero de preesfuerzo
Hincado de pilotes
Encamisado de pilotes

UNIDAD

Base: Especificaciones Direccin General de Caminos, Junio 2013.

Sistema Nacional de Inversin Pblica (SNIP)

38

PUENTE DE CONCRETO ARMADO (IN SITU)


(Actualizacin Gua de Costos 2013)
PUENTE (L = 12.0M)
DESCRIPCIN

Excavacin estructural para cimentacin


Relleno estructural
Concreto clase 3,000 PSI
Acero de Refuerzo
Acero Estructural
Tubo de hierro fundido de 4"
Almohadillas elastomricas
Concreto ciclpeo
Zampeado de Piedra ligada con Mortero
Excavacin estructural para cimentacin
PUENTE (L = 20.0 M)
Relleno estructural
Concreto clase 5,000 PSI
Concreto clase 4,000 PSI
Concreto clase 3,000 PSI
Acero de Refuerzo
Acero de preesfuerzo
Acero Estructural
Tubo de hierro fundido de 4"
Almohadillas elastomricas
Concreto ciclpeo

UNIDAD

COSTO UNITARIO Q.

m3
m3
m3
kg
kg
ml
dm3
m3
m2
m3

372.00
330.00
4,980.00
48.00
174.00
840.00
1,620.00
3,000.00
240.00
372.00

m3
m3
m3
m3
kg
kg
kg
ml
dm3
m3

330.00
6,840.00
5,820.00
4,980.00
48.00
192.00
174.00
840.00
1,620.00
3,000.00

Base: Especificaciones Direccin General de Caminos, Junio 2013.

PUENTE PREFABRICADO TIPO PRONTO (TIPO BAILEY)


Metro lineal Q.650,000; Ancho Metro2 Q. 66,000.00
PUENTE VEHICULAR PRE O POST TENSADO
Metro lineal por 10 metros de ancho Q. 150,000.00
Metro lineal por 20 metros de ancho Q. 250,000.00

39

Sistema Nacional de Inversin Pblica (SNIP)

ANEXO 9 COSTOS UNITARIOS DE


PROYECTOS DE AGUA POTABLE
REGLONES PRINCIPALES DE PROYECTOS DE AGUA
(Actualizacin costos 2,013)
UNIDAD

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

U
Km
U
U
U
U
U
U
U
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

COSTO UNITARIO Q.

2524.98
1294.15
681.31
329613.00
128566.55
21035.28
10663.47
36229.46
7017.21
29.87
45.39
59.25
72.79
91.33
106.33
133.41
152.29
206.46
633.54
38.75
46.04
65.21
77.71
91.66
125.21
152.29
205.00
275.21
551.87
792.29
9.30

Construccin 2013

Rtulo
Replanteo topogrfico
Muestreo y calidad del agua
Perforacin de Pozo
Equipo de bombeo
Caseta de Bombeo
Captacin brote definido
Desarenador
Caja distribuidora de caudales de 2 vertederos
Lnea de Conduccin
Tubera HG 1/2" TIPO LIVIANO
Tubera HG 3/4" TIPO LIVIANO
Tubera HG 1" TIPO LIVIANO
Tubera HG 1" TIPO LIVIANO
Tubera HG 1" TIPO LIVIANO
Tubera HG 2" TIPO LIVIANO
Tubera HG 2" TIPO LIVIANO
Tubera HG 3" TIPO LIVIANO
Tubera HG 4" TIPO LIVIANO
Tubera HG 5" TIPO LIVIANO
Tubera HG 1/2" TIPO MEDIANO
Tubera HG 3/4" TIPO MEDIANO
Tubera HG 1" TIPO MEDIANO
Tubera HG 1" TIPO MEDIANO
Tubera HG 1" TIPO MEDIANO
Tubera HG 2" TIPO MEDIANO
Tubera HG 2" TIPO MEDIANO
Tubera HG 3" TIPO MEDIANO
Tubera HG 4" TIPO MEDIANO
Tubera HG 6" TIPO MEDIANO
Tubera HG 8" TIPO MEDIANO
Tubera PVC 1/2" 315 PSI

CANTIDAD

promedio de

1
2
3
4
5
6
7
8
9
10
10.01
10.02
10.03
10.04
10.05
10.06
10.07
10.08
10.09
10.10
10.11
10.12
10.13
10.14
10.15
10.16
10.17
10.18
10.19
10.20
10.21
10.22

RENGLN

Gua sobre costos

No.

Fuente: INFOM/UNEPAR, Abril 2,013.

Sistema Nacional de Inversin Pblica (SNIP)

40

REGLONES PRINCIPALES DE PROYECTOS DE AGUA


(Actualizacin costos 2,013)
No.

10.23
10.24
10.25
10.26
10.27
10.28
10.29
10.30
10.31
10.32
10.33
10.34
10.35
10.36
10.37
10.38
10.39
10.40
10.41
11
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
11.10
11.11
11.12
11.13

RENGLN

Tubera PVC 3/4" 250 PSI


Tubera PVC 1" 160 PSI
Tubera PVC 1" 160 PSI
Tubera PVC 1" 160 PSI
Tubera PVC 2" 160 PSI
Tubera PVC 2" 160 PSI
Tubera PVC 3" 160 PSI
Tubera PVC 4" 160 PSI
Tubera PVC 5" 160 PSI
Tubera PVC 8" 160 PSI
Tubera PVC 1" 250 PSI
Tubera PVC 1" 250 PSI
Tubera PVC 1" 250 PSI
Tubera PVC 2" 250 PSI
Tubera PVC 2" 250 PSI
Tubera PVC 3" 250 PSI
Tubera PVC 4" 250 PSI
Tubera PVC 5" 250 PSI
Tubera PVC 8" 250 PSI
Lnea de distribucin
Tubera HG 1/2" TIPO LIVIANO
Tubera HG 3/4" TIPO LIVIANO
Tubera HG 1" TIPO LIVIANO
Tubera HG 1" TIPO LIVIANO
Tubera HG 1" TIPO LIVIANO
Tubera HG 2" TIPO LIVIANO
Tubera HG 2" TIPO LIVIANO
Tubera HG 3" TIPO LIVIANO
Tubera HG 4" TIPO LIVIANO
Tubera HG 6" TIPO LIVIANO
Tubera HG 1/2" TIPO MEDIANO
Tubera HG 3/4" TIPO MEDIANO
Tubera HG 1" TIPO MEDIANO

Fuente: INFOM/UNEPAR, Abril 2,013.

41

Sistema Nacional de Inversin Pblica (SNIP)

CANTIDAD

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

UNIDAD

U
Km
U
U
U
U
U
U
U
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

COSTO UNITARIO Q.

10.89
12.61
15.83
19.63
28.66
42.33
61.63
101.85
152.30
355.09
15.00
21.91
27.59
41.16
61.52
89.56
148.70
239.77
526.53
29.87
45.39
59.25
72.79
91.33
106.33
133.41
152.29
206.46
633.54
38.75
46.04
65.21

REGLONES PRINCIPALES DE PROYECTOS DE AGUA


(Actualizacin costos 2,013)
No.

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
U
U
U
U

COSTO UNITARIO Q.

77.71
91.66
125.21
152.29
205.00
275.21
551.87
792.29
9.30
10.89
12.61
15.83
19.63
28.66
42.33
61.63
101.85
152.30
355.09
15.00
21.91
27.59
41.16
61.52
89.56
148.70
239.77
526.53
1885.98
1797.22
1980.55
2154.70

Construccin 2013

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

UNIDAD

promedio de

Tubera HG 1" TIPO MEDIANO


Tubera HG 1" TIPO MEDIANO
Tubera HG 2" TIPO MEDIANO
Tubera HG 2" TIPO MEDIANO
Tubera HG 3" TIPO MEDIANO
Tubera HG 4" TIPO MEDIANO
Tubera HG 6" TIPO MEDIANO
Tubera HG 8" TIPO MEDIANO
Tubera PVC 1/2" 315 PSI
Tubera PVC 3/4" 250 PSI
Tubera PVC 1" 160 PSI
Tubera PVC 1" 160 PSI
Tubera PVC 1" 160 PSI
Tubera PVC 2" 160 PSI
Tubera PVC 2" 160 PSI
Tubera PVC 3" 160 PSI
Tubera PVC 4" 160 PSI
Tubera PVC 5" 160 PSI
Tubera PVC 8" 160 PSI
Tubera PVC 1" 250 PSI
Tubera PVC 1" 250 PSI
Tubera PVC 1" 250 PSI
Tubera PVC 2" 250 PSI
Tubera PVC 2" 250 PSI
Tubera PVC 3" 250 PSI
Tubera PVC 4" 250 PSI
Tubera PVC 5" 250 PSI
Tubera PVC 8" 250 PSI
Vlvula de aire con caja de concreto
Vlvula de limpieza 1" con caja de concreto
Vlvula de limpieza 1" con caja de concreto
Vlvula de limpieza 2" con caja de concreto

CANTIDAD

Gua sobre costos

11.14
11.15
11.16
11.17
11.18
11.19
11.20
11.21
11.22
11.23
11.24
11.25
11.26
11.27
11.28
11.29
11.30
11.31
11.32
11.33
11.34
11.35
11.36
11.37
11.38
11.39
11.40
11.41
11.42
11.43
11.44
11.45

RENGLN

Fuente: INFOM/UNEPAR, Abril 2,013.

Sistema Nacional de Inversin Pblica (SNIP)

42

REGLONES PRINCIPALES DE PROYECTOS DE AGUA


(Actualizacin costos 2,013)
No.

11.46
11.47
11.48
11.49
11.50
11.51
11.52
11.53
11.54
11.55
11.56
11.57
11.58
11.59
11.60
11.61
11.62
11.63
11.64
11.65
11.66
11.67
11.68
11.69
11.70
11.71
11.72
11.73
11.74
11.75
11.76
11.77

RENGLN

Vlvula de limpieza 1" con caja de concreto


Vlvula de Salida tanque 2" con caja de concreto
Vlvula de Salida tanque 2" con caja de concreto
Vlvula de Control 2" con caja de concreto
Caja rompe presin 1 m (1"-2")
Caja rompe presin 1 m (4"-3")
Caja rompe presin 1 m (3"-3")
Caja rompe presin 1 m (3"-2")
Caja rompe presin c/vlvula flote (3/4"-1") de 1 m3
Caja rompe presin c/vlvula flote (3/4"-1") de 1 m3
Caja rompe presin c/vlvula flote (3/4"-1") de 1 m3
Caja rompe presin c/vlvula flote (1"-2") de 1 m3
Anclajes para tubera HG concreto armado
Recubrimiento de tubera
Recubrimiento de tubera Concreto Ciclpeo+Armadura
Paso areo 12 mt
Paso areo 15 mt
Paso areo de 20 mt
Paso areo de 25 mt
Paso areo de 30 mt
Paso areo de 40 mt
Paso areo de 50 mt
Paso areo de 60 mt
Paso areo de 75 mt
Paso de Zanjn tipo B
Paso de Zanjn tipo C
Paso de Zanjn tipo D
Paso de Zanjn tipo E
Paso de Zanjn tipo F
Tanque de distribucin de concreto ciclpeo de 5 m
Tanque de distribucin de concreto ciclpeo de 10 m
Tanque de distribucin de concreto ciclpeo de 15 m

Fuente: INFOM/UNEPAR, Abril 2,013.

43

Sistema Nacional de Inversin Pblica (SNIP)

CANTIDAD

UNIDAD

COSTO UNITARIO Q.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

U
U
U
U
U
U
U
U
U
U
U
U
U
M
M
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U

1931.91
2132.99
2491.90
2491.90
6569.40
7569.93
7120.42
6776.17
6118.60
6086.74
6086.74
6274.54
157.18
222.93
307.64
13055.24
14347.85
14347.85
14975.28
14975.28
15600.17
20457.71
21569.04
27887.65
3384.22
2080.73
4688.35
5034.60
5080.24
28286.61
39225.96
49794.83

REGLONES PRINCIPALES DE PROYECTOS DE AGUA


(Actualizacin costos 2,013)
UNIDAD

COSTO UNITARIO Q.

11.78
11.79
11.8
11.81
11.82
11.83
11.84
11.85
11.86
11.87
11.88
11.89
11.9
11.91
11.92
11.93
11.94
11.95
11.96
11.97
11.98
11.99
12
12.01
12.02
12.03
12.04
12.05
12.06

Tanque de distribucin de concreto ciclpeo de 20 m


Tanque de distribucin de concreto ciclpeo de 30 m
Tanque de distribucin de concreto ciclpeo de 40 m
Tanque de distribucin de concreto ciclpeo de 50 m
Tanque de distribucin de concreto ciclpeo de 60 m
Tanque de distribucin de concreto ciclpeo de 75 m
Tanque de distribucin de concreto ciclpeo de 150 m
Tanque de distribucin de concreto armado de 5 m
Tanque de distribucin de concreto armado de 10 m
Tanque de distribucin de concreto armado de 20 m
Tanque de distribucin de concreto armado de 50 m
Tanque de distribucin de concreto armado de 200 m
Vlvula de control 1" con caja
Vlvula de control 4" con caja
Caja rompe presin c/vlvula flote (1"-1")
Caja rompe presin c/vlvula flote (1"-3/4")
Caja rompe presin c/vlvula flote (2"-1")
Caja rompe presin c/vlvula flote (2"-1")
Caja rompe presin c/vlvula flote (3"-4")
Tanque de bombeo c/vlvula flote (1")
Caja rompe presin 1 m (2 " 2 ")
Caja rompe presin 1 m (2 " 3")
Paso areo de 100 mt
Caja Reunidora de caudales
Caja rompe presin (1"-2")
Hipoclorador
Conexiones prediales con contador
Sumideros
Llena cantaros

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U

63029.98
78132.16
90942.81
104408.72
139001.72
147657.24
301107.42
19134.04
26954.66
41809.98
88553.25
234827.42
1957.35
3071.65
6107.72
6409.45
6549.7
6581.56
7885.18
6019.54
6619.07
6963.32
40317.25
4992.91
6212.75
4486.41
1341.84
1586.68
4237.47

Construccin 2013

CANTIDAD

promedio de

RENGLN

Gua sobre costos

No.

Fuente: INFOM/UNEPAR, Abril 2,013.

Sistema Nacional de Inversin Pblica (SNIP)

44

COSTOS UNITARIOS DE
PROYECTOS DE MINIRIEGO

ANEXO 10

RENGLONES PRINCIPALES PROYECTOS MINI RIEGO


(Actualizacin costos 2,013)
OBRA CIVIL:
DESCRIPCIN

Captacin
Caja unificadora de caudales
Caja desarenadora
Tanque de distribucin
Cajas rompe-presin
Cajas protectoras de vlvulas de
aire y limpieza
Cajas protectoras de caballetes
Brocal de pozo artesanal
Caseta de proteccin de pozo
artesanal
Caseta de proteccin de equipo
de bombeo
Pasos de zanjn Tipo A
Pasos de zanjn Tipo B
Pasos de zanjn Tipo C
Pasos areos
Lnea de conduccin
Lnea de distribucin
Lnea de distribucin parcelaria
(manifolds y laterales, o ramales
parcelarios)
Materiales y Equipo de riego
Mangueras de goteo, 18
milsimas de grosor
Manguera ciega

UNIDAD

U
U
U
U
U
U
U
U
U
U
U
U
U
U

COSTO Q.

OBSERVACIONES

8,000.00 Depende del dimetro de la tubera y la extensin a regar


4,500.00 Los volmenes a unificar hacen la diferencia en costos
15,000.00 Dimensiones de la caja desarenadora son importantes
Depende del volumen de agua a contener

4,000.00
1,800.00
2,500.00
1,500.00
2,000.00
15,000.00
1,850.00
3,500.00
4,650.00
12,050.00 20 metros de longitud, tubera de 2"

M
M

Los precios de estas lneas dependen de la longitud, dimetro


de tubera, ubicacin de instalacin, mano de obra local y
otros imponderables.

El grosor de la manguera es determinante en el precio por

1.40 metro lineal


2.50

Estimaciones MAGA-Viceministerio de Desarrollo Econmico Rural-Direccin de Infraestructura Productiva. Abril 2,013.

45

Sistema Nacional de Inversin Pblica (SNIP)

RENGLONES PRINCIPALES PROYECTOS MINI RIEGO


(Actualizacin costos 2,013)
DESCRIPCIN

U
U

COSTO Q.

OBSERVACIONES

2.50
35.00 De mejor calidad puede llegar a costar unos Q65.00

U
U

110.00
250.00

125.00

U
U
U
U
U

125.00
25.00
600.00

1,800.00

Gua sobre costos

Los precios varan atendiendo la extensin a regar, nmero


de usuarios a atender, volmenes de agua a manejar.

promedio de

Empaques, conectores
Llaves de chorro de bronce de
1/2"
Manmetro simple
Manmetro con glicerina
Manguera reforzada de dos capas
x 1/2" x 15metrosde longitud
Aspersores sectorial de 1/2"
Micro-aspersores, completo
Trpode
Equipo de bombeo
Sistema de filtrado
Sistema de ferti-rrigacin, tipo
Venturi de 1"

UNIDAD

Estimaciones MAGA-Viceministerio de Desarrollo Econmico Rural-Direccin de Infraestructura Productiva. Abril 2,013.

Construccin 2013

OBSERVACIONES: se han hecho algunas observaciones en el cuadro, sin embargo para todos los tems
existen diferentes precios, dados por: calidad, tamao, tipo, uso a que se someter, volmenes de agua a
utilizar, acceso al lugar de instalacin, ubicacin del proyecto, costo de mano de obra local, costo de materiales
locales, etc.
NOTA: en trminos generales, los costos arriba anotados son para proyectos de riego de hortalizas y para
riego de frutales como aguacate, ctricos, mango, papaya.

Sistema Nacional de Inversin Pblica (SNIP)

46

RENGLONES PRINCIPALES PROYECTOS DE MINI RIEGO


(Actualizacin costos 2,013)
A. COSTOS SEGN MTODO DE RIEGO POR UNIDAD DE REA
No.

CONCEPTO

1 Mtodo de Riego Aspersin


Mvil (Aluminio):
Mtodo de riego por Goteo
2
(en frutales):
Mtodo de riego por Goteo
3
(en Hortalizas):
Mtodo de riego por Micro4
aspersin:
Mtodo de Riego por
5
Aspersin fija:
Mtodo de Riego por
6
Aspersin mvil (PVC):
Mtodo de Riego por
7
Aspersin mvil (Chorros):
Mtodo de Riego
8 bombeo/superficial: Para
pozos someros

CULTIVOS

Pastos y Caa
Mango, ctricos,
aguacate y deciduos
Todas las Hortalizas
Frutales
Pastos y caa
Pastos y caa

RANGO DE COSTOS
o PROMEDIOS (Q)

14,000.00 a
16,000.00
15,000.00
18,000.00 a
20,000.00
16,000.00 a
18,000.00
14,000.00 a
17,000.00
10,000.00 a
14,000.00

Hortalizas

12,000.00

Hortalizas de clima
clido

15,000.00

OBSERVACIONES

Para un rea de 10 Mz de
riego
Costo promedio para una
manzana
Costo promedio para una
manzana
Costo promedio para una
manzana
Costo promedio para una
manzana
Costo promedio para una
manzana
Costo promedio para una
manzana
Costo promedio para 1 a 2
manzanas. Modalidad de 1
motobomba (5HP) y 35
tubos

MAGA/Viceministerio de Desarrollo Econmico Rural/Direccin de Infraestructura Productiva DIPRODU. Abril 2,013.

Nota: Todos los valores incluyen costos de materiales dentro de la parcela de riego y una conduccin
de un mximo de 300 metros.

47

Sistema Nacional de Inversin Pblica (SNIP)

RENGLONES PRINCIPALES PROYECTOS DE MINI RIEGO


(Actualizacin costos 2,013)
B. COSTOS DE CONDUCCIN POR TUBERA

1
1 1/4
1 1/2
2 (160 PSI)
2 1/2 (160 PSI)
3 (160 PSI)
4 (160 PSI)
6 (160 PSI)
8 (160 PSI)
10 (160 PSI)
12 (160 PSI)
15 (160 PSI)

220
220
220
220
210
200
175
160
120
100
90
70

COSTO MANO DE OBRA COSTO ESTIMADO/METRO


ESTIMADO POR TUBO
ZANJADO Y RELLENADO
INSTALADO (Q)
(Q)

1.36
1.36
1.82
1.82
1.9
2
2.29
3.13
4.17
5
7.78
10

11
11
11
11
11
11
11
11
11
22
22
22

COSTO
DE LISTA/TUBO Q.

56
69
101
140
201
305
504
1,092.00
1,867.00
3,360.00
4,726.00
6,817.00

COSTO TOTAL
ESTIMADO (Q)

68.36
81.36
113.82
152.82
213.9
318
517.29
1,106.13
1,882.17
3,387.00
4,755.78
6,849.00

promedio de

No. DE TUBOS
INSTALADOS EN 8
HORAS

Gua sobre costos

DIAMETRO NOMINAL ()
DE TUBOS DE 6 METROS
DE LONGITUD

MAGA/Viceministerio de Desarrollo Econmico Rural/Direccin de Infraestructura Productiva, DIPRODU. Abril 2,013.

Construccin 2013

RENGLONES PRINCIPALES PROYECTOS DE MINI RIEGO


(Actualizacin costos 2,013)
A. COSTOS SEGN MTODO DE RIEGO POR UNIDAD DE REA
No.

CONCEPTO

1 Equipo de bombeo Gasolina


2 Equipo de bombeo diesel

HP DE EQUIPO DE
BOMBEO

5.5 HP
10 HP

COSTO ESTIMADO
(Q)

6,000.00
15,000.00

OBSERVACIONES

Con accesorios de succin y descarga


Completa

MAGA/Viceministerio de Desarrollo Econmico Rural/Direccin de Infraestructura Productiva, DIPRODU. Abril 2,013.

Sistema Nacional de Inversin Pblica (SNIP)

48

PARAMETROS DE COSTOS
ANEXO 11
UNITARIOS POR UNIDAD DE MEDIDA
PARMETROS COMPARATIVOS DE COSTOS UNITARIOS
(Actualizacin costos 2,013)
ESTUDIOS DE PRE INVERSIN
DESCRIPCIN

UNIDAD

CANTIDAD

COSTO UNITARIO (Q.)


DE

CAMINOS RURALES
Con estudio de suelos
Sin estudio de suelos
PUENTE VEHICULAR (10 A 20 METROS)
Con estudio de suelos
Hidrologa Hidrulica
Seccin de mrgenes
Topografa
Diseo puente
Sin estudio de suelos
DRENAJE SANITARIO (Con planta de tratamiento de aguas
residuales)
Hasta 5 kilmetros
De 5 a 7.50 kilmetros
De 7.50 a 10 kilmetros
De 10 a 15 kilmetros
PLANTA DE TRATAMIENTO DE DESECHOS SLIDOS
Lagunas de oxidacin
Planta tratamiento de lixividos
rea de construccin obra civil
(Un mnimo de 2 y un mximo de 4 estudios de mecnica de
suelos)
AGUA POTABLE (Con planta de tratamiento)
Hasta 5 kilmetros
De 5 a 7.50 kilmetros
De 7.50 a 10 kilmetros
De 10 a 15 kilmetros
INTRODUCCIN DE ENERGA ELECTRICA
Rango de 1 a 3 de carga
Rango de 4 a 7 de carga
Rango de 8 a 10 de carga
Rango de 11 de carga
Rango de 12 a 20 de carga
Por proyecto (varias viviendas, Cables primarios 13,000 voltios
a Cables secundarios 120-240 voltios)

49

Sistema Nacional de Inversin Pblica (SNIP)

Km
Km

1.00
1.00

355,445.00
257,570.00

609,500.00
420,332.00

Km
Km
Km
Km
Km
Km

1.00
1.00
1.00
1.00
1.00
1.00

20,000.00
15,000.00
5,000.00
10,000.00
15,000.00
14,500.00

21,000.00
15,700.00
6,400.00
10,500.00
15,700.00
15,200.00

Km
Km
Km
Km

1.00
1.00
1.00
1.00

U
U
U

1.00
1.00
1.00

Km
Km
Km
Km

1.00
1.00
1.00
1.00

8,500.00
7,500.00
6,500.00
5,500.00

U
U
U
U
U

1.00
1.00
1.00
1.00
1.00

100.00
200.00
300.00
400.00
12,000.00

1.00

9,200.00
8,200.00
7,200.00
6,200.00
25,000.00
25,000.00
16,000.00

25,000.00

35,000.00
35,000.00
32,000.00

30,000.00

PARMETROS COMPARATIVOS DE COSTOS UNITARIOS


(Actualizacin costos 2,013)
COSTO UNITARIO DE EJECUCIN DE PROYECTOS
DESCRIPCIN

UNIDAD

CANTIDAD

COSTO UNITARIO (Q.)


DE

1.00

2,390.00

2,705.00

1.00

2,400.00

2,750.00

1.00

4,625.00

4,810.00

m
m

1.00
1.00

720.00
410.00

850.00
550.00

m
m
m
domicilio

1.00
1.00
1.00
1.00

promedio de

Gua sobre costos

150.00
45.00
15.00
11,500.00
4,200.00
180.00
466.00

4,500.00
200.00
535.00
3,000.00
19,200.00
1,386.00
2,050.00
2,800.00
300.00
420.00
420.00
420.00

m
m

1.00
1.00

casa
poste
poste
poste
poste
m
m
m
m

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

2,000.00
14,000.00

Km
Km
m
m
m
unidad
m
m

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

505,700.00
202,310.00
110.60
187.00
232.00
21,567.00
250.00
223.50

150.00
300.00

Construccin 2013

EDIFICACIONES: ESCUELAS, PUESTOS DE SALUD,


CENTROS DE ACOPIO, ETC. (incluye instalaciones)
Block visto sisado, piso de concreto, estructura metlica en
techo, lmina de zinc, ventanas metal + vidrio
Block visto sisado, piso de concreto tintado, estructura metlica
en techo, lmina de perfil 10, ventanas metal + vidrio
Paredes repelladas, losa de concreto, piso imitacin granito,
estructura metlica de techo, lmina perfil 10
Muro perimetral de block
Muro perimetral de malla
INTRODUCCIN AGUA POTABLE (no se incluye tanque
de abastecimiento o captacin)
Tubera PVC 4"
Tubera PVC 2"
Tubera PVC 1"
Promedio acometida domiciliar
DRENAJES
Casa que drena a sistema mixto (Con tubo PVC 4", Tubo
Pluvial de 3", drenaje inodoro).
Promedio tubera 6" a 16"
INTRODUCCIN ENERGA ELCTRICA
Por acometida domiciliar (120-240 Voltios por residencia)
Por poste
Poste de concreto 30 pies
Poste de concreto 35 pies
poste de concreto 40 pies
Por metro de lnea alta tensin
Por metro de lnea baja tensin
Por metro de lnea alta tensin (Cambio de cable)
Por metro de lnea baja tensin (Cambio de cable)
CAMINOS RURALES
Apertura, incluye balastado e=0.20 y cunetas
Ampliacin, incluye balastado e=0.20 y cunetas
Balastado e=0.20 y cunetas
Empedrado simple, incluye cunetas
Empedrado fraguado, incluye cunetas
Drenaje transversal 24" tubera metlica y cabezales
Empedrado fraguado con carrileras, incluye cunetas
Adoquinado con bordillo y llaves de confinamiento

708,000.00
303,500.00
120.60
197.00
247.00
23,965.00
277.00
242.00

Sistema Nacional de Inversin Pblica (SNIP)

50

Adoquinado con bordillo y llaves de confinamiento y cuneta


Losa de concreto
PUENTES
Vehicular hasta 20 metros de largo y 5 metros de ancho
Peatonal de hamaca, hasta 50 m de largo y 1 m de ancho

m
m

1.00
1.00

243.15
480.00

256.00
570.00

m
m

1.00
1.00

49,240.00
6,975.00

58,740.00
11,200.00

EQUIPOS DE BOMBEO PARA POZOS ANEXO 12


EQUIPO DE BOMBEO 20 HP
(Actualizacin costos 2,013)
DESCRIPCIN

Rubro "A": mano de obra y artculos estimados


75fa20 bomba sum. 20hp 75gpm
Motor sumergible franklin 20hp 460v 3f n04
Malvula cheque flomatic 3" hf
Tubo pvc 160 psi 6" x pie
Tapn hembra pvc 6"
Minicollarin de 3"
Tubo gal. tipo mediano 2-1/2"
Sello sanitario 8"x2 1/2"
Collarin soporte 2 1/2" h.f.
Tee galvanizada de 2-1/2'
Tapn macho gal. 2-1/2"
Niple gal. 2-1/2" x 4"
Unin universal gal. 2-1/2"
Pie de cable sumergible 3 x 6
Lnea de aire de 1/4" pie
Transformador tipo seco 30kva 480/240/120vol
HMCP100R3 flipon 3x100 c.h. 600v 23-84.5amp
Movilizacin de maquinaria fuera capital
Inst sumer mo hid, elec, ent 7.5-25hp
Movimiento tubo 2-1/2" 3" (cobr minimo 20 t)
Kilometraje incurrido en obras
SUBTOTAL
Rubro "B": mano de obra y artculos estimados
Variador de frecuencia 20 hp 460v
TOTAL

UNIDAD

Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad

CANTIDAD

1
1
3
10
1
1
34
1
1
1
1
2
1
680
670
1
1
100
1
33
100

COSTO
UNITARIO Q.

9,313.58
15,759.56
2,120.00
48.65
212.40
54.80
613.00
449.32
324.78
254.80
33.38
87.46
271.60
35.61
1.08
13,394.12
1,742.49
12.5
2,500.00
98.00
3.17

COSTO
TOTAL Q.

9,313.58
15,759.56
6,360.00
486.50
212.40
54.80
20,842.00
449.32
324.78
254.80
33.38
174.92
271.60
24,214.80
723.6
13,394.12
1,742.49
1,250.00
2,500.00
3,234.00
317
101,913.65
25,249.00
127,162.65

Notas: Suministro e instalacion de equipo sumergible 20hp 460v 3f, con una produccion de 70 gpm a
una cdt de 703 pies
La mano de obra no incluye trabajos de obra civil.
Toda la instalacin est cotizada nicamente dentro de la caseta de bombeo.
Fuente: Hidrotecnia; Hidrobombas S.A.; Acuasistemas.

51

Sistema Nacional de Inversin Pblica (SNIP)

EQUIPO DE BOMBEO 60 HP
(Actualizacin costos 2,013)
DESCRIPCIN

COSTO
TOTAL Q.

Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad
Unidad

1
1
3
10
1
1
34
1
1
1
1
2
1
680
670
1

9,313.58
15,759.56
2,120.00
48.65
212.40
54.80
613.00
449.32
324.78
254.80
33.38
87.46
271.60
35.61
1.08
13,394.12

21,900.00
41,500.00
21,187.10
19,440.20
789.04
2,313.60
3,455.53
270
150.00
1,243.84
103.82
209.92
3,556.80
6,545.00
3,500.00
5,000.00
131,164.85

Unidad
Unidad
Unidad

12
1
1

6.72
650
70,000.00

80,640.00
650
70,000.00

Unidad
Unidad
Unidad
Unidad

1
1
1
1

800
1,410.00
75
5,000.00

800
1,410.00
75
5,000.00
283,181.61

Construccin 2013

COSTO
UNITARIO Q.

promedio de

CANTIDAD

Gua sobre costos

Rubro "A": mano de obra y artculos estimados


8t60-950 bomba sumergible berkeley 8"
Totor sumergible franklin 60hp 460v 3f v04
4090 valvula cheque flomatic 8" hf
Ppie de cable sumergible 3 x 2
Tapn hembra pvc 8"
Tubo pvc 160 psi 8" x pie
WD30103-8 valvula mariposa nibco de 8"
Lnea de aire de 1/4" pie
Kit de prueba para linea de aire
Flange astm-a105 8" sch-40 liso
Empaque asbesto graf 8"
Tornillo de 3/4 x 8 pulgadas completo
Movilizacin maqna grande fuera capit terrace
Movimiento tubo 8" (cobro minimo 20 t.)
Inst sumer mo hid, elec, ent 30-60 hp
Accesorios menores instal equipo sumergible
SUBTOTAL
Rubro "B": mano de obra y artculos estimados
Tubos hierro negro con rosca y copla de 8 pulgadas
Tee hierro negro de 8 pulgadas
Panel con arrancador suave para gobernar 60 hp, arrancador,
Flipones de mando y fuerza, protecciones termicas, luces
indicadoras de arranque y paro, luces de arranque y paro,
sello sanitario de 10 x 8 pulgadas
Collarin soporte tipo pesado de 8 pulgadas
Minicollarin de 8 x 8 pulgadas para funda de enfriamiento
Tren de descarga de 8 pulgadas que incluye accesorios, sold.
TOTAL

UNIDAD

Notas: Suministro e instalacion de equipo de bombeo sumergible para producir 900 gpm a una cdt de
200 pies, con arrancador suave.
La mano de obra no incluye trabajos de obra civil.
Toda la instalacin est cotizada nicamente dentro de la caseta de bombeo.
Fuente: Hidrotecnia; Hidrobombas S.A.; Acuasistemas.

Sistema Nacional de Inversin Pblica (SNIP)

52