DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
INFORME DE TERRACERÍAS
PROYECTO:
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
CIUDAD DE MÉXICO
MARZO 2021
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
CONTROL DE DOCUMENTACIÓN
Autor:
____________________________
Ing. David Borrego
2
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
CONTENIDO
CONTROL DE DOCUMENTACIÓN ........................................................................................................ 2
ÍNDICE DE TABLAS ............................................................................................................................... 6
ÍNDICE DE FIGURAS ............................................................................................................................. 8
1. ANTECEDENTES ........................................................................................................................... 9
2. OBJETO ........................................................................................................................................ 9
3. UBICACIÓN ................................................................................................................................10
4. ESTUDIO GEOTÉCNICO ..............................................................................................................11
4.1. GEOLOGÍA GENERAL ......................................................................................................... 11
4.2. ESTRATIGRAFÍA Y LITOLOGÍA ............................................................................................ 13
4.2.1. Unidad geotécnica U1. Suelo cuaternario cohesivo medio. Arcillas y limos............. 16
4.2.2. Unidad geotécnica U2. Suelo residual granular medio. Arenas con algo de limos y
gravas. 16
4.2.3. Unidad geotécnica U3. Suelo residual cohesivo muy duro. ...................................... 16
4.2.4. Unidad geotécnica U4. Suelo residual granular muy denso. Arenas con algo de limos
y gravas. 16
4.2.5. Unidad geotécnica U5. Relleno antrópico. ................................................................ 16
4.2.6. Unidad geotécnica U6. Calizas coquinas. .................................................................. 16
4.2.7. Unidad geotécnica U7. Calizas masivas. .................................................................... 17
4.3. MECÁNICA DE SUELOS ...................................................................................................... 17
4.4. TRABAJOS REALIZADOS ..................................................................................................... 17
4.5. RESUMEN DE DATOS GEOTÉCNICOS ................................................................................. 19
4.5.1. Observaciones particulares a las tablas de datos geotécnicos ................................. 61
4.6. BANCOS DE MATERIALES .................................................................................................. 62
5. DISEÑO ......................................................................................................................................65
5.1. CLASIFICACIÓN DE LA VÍA A DISEÑAR ............................................................................... 65
5.2. ESPESOR DE TERRAPLÉN ................................................................................................... 66
5.3. ESPESOR DE BALASTO Y SUB‐BALASTO ............................................................................. 66
5.3.1. Método de cálculo ..................................................................................................... 66
3
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5.3.2. Conclusiones .............................................................................................................. 66
5.4. CARACTERÍSTICAS DE MATERIALES ................................................................................... 66
5.4.1. Balasto ....................................................................................................................... 66
5.4.2. Sub‐balasto ................................................................................................................ 70
5.4.3. Subrasante ................................................................................................................. 72
5.4.4. Terraplenes ................................................................................................................ 73
5.4.5. Terraplenes en zonas encharcables .......................................................................... 73
5.5. CORTES .............................................................................................................................. 74
5.5.1. Cortes en zonas de la vía del FIT ............................................................................. 180
5.6. REVEGETACIÓN DE TALUDES .......................................................................................... 180
5.7. ZONAS ENCHARCABLES ................................................................................................... 181
5.8. TERRENO NATURAL ......................................................................................................... 182
5.8.1. Desmonte ................................................................................................................ 182
5.8.2. Despalme ................................................................................................................. 182
6. CURVA MASA, ACARREOS Y DESPERDICIOS ........................................................................... 190
6.1. CÁLCULOS DE PRÉSTAMOS Y DESPERDICIOS .................................................................. 190
6.1.1. Cálculo de acarreos para terraplén ......................................................................... 191
6.1.2. Cálculo de acarreos para subrasante ...................................................................... 307
6.1.3. Cálculo de acarreos para sub‐balasto ..................................................................... 458
6.1.4. Cálculo de acarreos para balasto ............................................................................ 564
6.1.5. Cálculo de acarreos para rellenos de zonas encharcables ...................................... 721
7. PROCEDIMIENTO CONSTRUCTIVO ......................................................................................... 767
7.1. SECUENCIA CONSTRUCTIVA ............................................................................................ 767
7.1.1. Desmonte ................................................................................................................ 767
7.1.2. Despalme ................................................................................................................. 768
7.1.3. Corte ........................................................................................................................ 769
7.1.4. Terraplenes .............................................................................................................. 770
7.2. MAQUINARIA .................................................................................................................. 773
8. VOLÚMENES GENERADOS ...................................................................................................... 775
4
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
9. CONCLUSIONES Y RECOMENDACIONES ................................................................................. 776
ANEXO 1: FICHAS DE BANCOS DE MATERIALES ............................................................................. 777
ANEXO 2: RESUMEN DE ANÁLSIS DE LOS MATERIALES ................................................................. 777
ANEXO 3: ACTAS DE ENSAYOS DE LABORATORIO .......................................................................... 777
5
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
ÍNDICE DE TABLAS
Tabla 1 Subtramos del proyecto del Tramo 3 del Tren Maya ............................................................. 9
Tabla 2 Estudios geotécnicos realizados por subtramo. .................................................................. 17
Tabla 3 Resumen de datos geotécnicos del tramo [Administrador] ................................................. 19
Tabla 4 Resumen de datos geotécnicos del tramo 5071+500 – 6006+000 ..................................... 39
Tabla 5 Resumen de datos geotécnicos del tramo 6017+000 AL 6030+000 ................................... 44
Tabla 6 Resumen de datos geotécnicos del tramo 6036+800– 6067+000 ...................................... 51
Tabla 7 Bancos de préstamo para el Tramo 3 .................................................................................. 63
Tabla 8 Criterios de diseño ............................................................................................................... 65
Tabla 9 Valores recomendados para pruebas de balasto. PROY-NOM-003-ARTF-2018 y AREMA
2020................................................................................................................................................... 67
Tabla 10 Valores propuestos para material del balasto. Manual de calidad para materiales .......... 68
Tabla 11 Graduación de balasto recomendada. AREMA 2020 ........................................................ 69
Tabla 12 Características del material a usar en la capa de sub-balasto. Manual De Calidad De Los
Materiales .......................................................................................................................................... 70
Tabla 13 Características del material a usar en la capa de sub-balasto. Especificación técnica
fonatur ............................................................................................................................................... 72
Tabla 14 Características del material a usar en la capa de subrasante. Manual de CAlidad de los
materiales .......................................................................................................................................... 72
Tabla 15 Característica de los terraplenes. manual de calidad de los materiales. ........................... 73
Tabla 16 Característica de los terraplenes en zonas encharcables. manual de calidad de los
materiales y ADIF. ............................................................................................................................. 74
Tabla 17 Volumen de corte para el tramo del [Administrador].......................................................... 74
Tabla 18 Volumen de corte para el tramo del 5071+500 – 6006+000............................................ 121
Tabla 19 Volumen de corte para el tramo del 6017+000 AL 6030+000 ......................................... 131
Tabla 20 Volumen de corte para el tramo del 6036+800– 6067+000............................................. 147
Tabla 21 Espesor de despalme del [Administrador] ....................................................................... 182
Tabla 22 Espesor de despalme del 5071+500 – 6006+000 ........................................................... 185
Tabla 23 Espesor de despalme del tramo 6017+000 AL 6030+000............................................... 186
Tabla 24 Espesor de despalme del tramo 6036+800– 6067+000 .................................................. 188
Tabla 25 Cálculo de curva masa del tramo del [Administrador] ..................................................... 191
Tabla 26 Cálculo de curva masa del tramo del 5071+500 – 6006+000 ......................................... 244
Tabla 27 Cálculo de curva masa del tramo del 6017+000 AL 6030+000 ....................................... 255
Tabla 28 Cálculo de curva masa del tramo del 6036+800– 6067+000 .......................................... 272
Tabla 29 Cálculo de acarreos de subrasante del tramo [Administrador] ........................................ 307
Tabla 30 Cálculo de acarreos de subrasante del tramo 5071+500 – 6006+000 ............................ 360
Tabla 31 Cálculo de acarreos de subrasante del tramo 5043+000 – 5051+000 ............................ 371
Tabla 32 Cálculo de acarreos de subrasante del tramo 5051+000 – 5070+000 ............................ 380
Tabla 33 Cálculo de acarreos de subrasante del tramo 5070+000 – 6005+000 ............................ 402
Tabla 34 Cálculo de acarreos de subrasante del tramo 6017+000 AL 6030+000 ......................... 411
Tabla 35 Cálculo de acarreos de Subrasante del tramo 6036+800– 6067+000 ........................... 427
Tabla 36 Cálculo de acarreos de sub-balasto del tramo [Administrador] ....................................... 459
Tabla 37 Cálculo de acarreos de sub-balasto del tramo 5071+500 – 6006+000 ........................... 505
Tabla 38 Cálculo de acarreos de sub-balasto del tramo 6017+000 AL 6030+000......................... 516
Tabla 39 Cálculo de acarreos de sub-balasto del tramo 6036+800– 6067+000 ............................ 533
Tabla 40 Cálculo de acarreos de balasto vía principal del tramo [Administrador] .......................... 565
Tabla 41 Cálculo de acarreos de balasto del ladero 5007+000...................................................... 618
Tabla 42 Cálculo de acarreos de balasto del ladero 5043+000...................................................... 625
Tabla 43 Cálculo de acarreos de balasto de estación maxcanu vía derecha ................................ 628
Tabla 44 Cálculo de acarreos de balasto de estación maxcanu vía izquierda ............................... 630
Tabla 45 Cálculo de acarreos de balasto de culatón derecho ........................................................ 634
6
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
7
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
ÍNDICE DE FIGURAS
Figura 1 Mapa geológico general de la Península de Yucatán donde se muestra el eje del tramo 3
........................................................................................................................................................... 12
Figura 2 Columna estratigráfica general para el tramo 3, con base en la carta geológico-minera
Mérida F16-10 ................................................................................................................................... 15
Figura 3 Granulometría balasto. Manual de calidad para materiales ............................................... 69
Figura 4Curvas granulométricas para Sub-Balasto. Manual de calidad para materiales. ................ 71
Figura 5 Sección transversal de zonas donde interactúa la línea del FIT con el trazado del Tramo 3
......................................................................................................................................................... 180
Figura 6 Propuesta de revegetación de taludes ............................................................................. 181
Figura 7 Sección tipo de terraplén en zonas encharcables ............................................................ 182
Figura 8 Ejemplo de gráfica de Ordenada Curva Masa. Manual de Proyecto Geométrico de
Carreteras 2018............................................................................................................................... 191
Figura 9 Sección transversal de un terraplén. ................................................................................ 772
8
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
1. ANTECEDENTES
El Gobierno Mexicano, como parte del Plan Nacional de Desarrollo 2019‐2024, contempla la
implementación del Tren Maya como el proyecto más importante de infraestructura, desarrollo
socioeconómico y turismo de dicho sexenio.
Para ello, el Fondo Nacional de Fomento al Turismo (FONATUR), institución encargada para la
preparación e implementación del proyecto, adjudicó en mayo de 2020, al Consorcio AZVINDI a
través de la licitación pública internacional LO‐021W3N003‐E60‐2020 el tramo III del Tren Maya que
discurre entre Calkiní e Izamal.
El proyecto completo se divide en 7 tramos y consiste en la implementación de un ferroriel para la
prestación de servicios de transporte de pasajeros y de mercancías interconectando cinco entidades
federativas al sureste de México: Yucatán, Quintana Roo, Campeche, Tabasco y Chiapas. La longitud
total del proyecto es de 1452 km.
El tramo 3 objeto del presente contrato, discurre entre las localidades de Calkiní e Izamal, con una
longitud de línea principal aproximada de 157,2 km. Este a su vez se puede dividir en dos (2) grandes
subtramos, el primero con origen en Calkiní hasta el P.K. 6003+000 y el segundo con origen en el
P.K. 6003+000 hasta Izamal.
El presente documento TMPE‐3‐VA‐VIA‐INF‐0006 comprende los estudios del proyecto de
terracerías del Tramo 3 del Tren Maya, por lo que atiende los comentarios emitidos por la
Supervisión a los documentos relativos a los bancos de materiales TMPE‐3‐VA‐GEO‐INF‐BMAT‐0001
(PK5000+000 – 5072+788) y TMPE‐3‐VA‐GEO‐INF‐BMAT‐0002 (PK6018+000 – 6030+000), en los
respectivos informes de revisión P0M10146‐T3‐GEO‐INF‐0021_00 y P0M10146‐T3‐GEO‐INF‐
0027_00.
2. OBJETO
El objetivo de este documento es presentar los cálculos, criterios de diseño y consideraciones
tomadas para el proyecto Ejecutivo de terracerías de los tramos no condicionados por variantes del
proyecto.
Los tramos no condicionados están divididos en los cadenamientos indicados en la Tabla 1.
TABLA 1 SUBTRAMOS DEL PROYECTO DEL TRAMO 3 DEL TREN MAYA
TRAMO CADENAMIENTO INICIAL
TRAMO 1 VARIANTE
9
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TRAMO 2 [Administrador]
TRAMO 3 VARIANTE
TRAMO 4 VARIANTE
TRAMO 5 5071+500 – 6006+000
TRAMO 6 VARIANTE
TRAMO 7 6017+000 AL 6030+000
TRAMO 8 VARIANTE
TRAMO 9 6036+800– 6067+000
TRAMO 10 VARIANTE
3. UBICACIÓN
El tramo 3 del proyecto del Tren Maya, con nombre Golfo 2, abarca desde los límites políticos del
estado de Yucatán con el estado de Campeche, al sur de Maxcanú, y termina en la cabecera
municipal de Izamal, comprendiendo una longitud total de 157.2 km.
En la siguiente imagen se muestra la ubicación del tramo III dentro del trazado general del Tren
Maya.
FIGURA 4.1. RED DE VÍAS FÉRREAS DE LA LÍNEA MAYAB, COMPAÑÍA DE FERRORIELES CHIAPAS‐MAYAB. EN EL RECUADRO
ROJO SE INDICA LA LOCALIZACIÓN DEL TRAMO 3.
10
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
4. ESTUDIO GEOTÉCNICO
4.1. GEOLOGÍA GENERAL
El tramo estudiado se encuentra sobre la provincia geológica Plataforma de Yucatán. La geología de
esta plataforma está dominada por sedimentos calcáreos que se han depositado de manera
ininterrumpida desde el Paleoceno, por lo que en superficie sólo se observan depósitos cenozoicos.
La Plataforma de Yucatán comprende los estados de Yucatán, Campeche, Quintana Roo, Tabasco y
Chiapas, y se extiende costa afuera hacia la plataforma continental del Golfo de México y del Caribe.
El tramo de estudio se ubica dentro de las cartas geológico‐mineras Mérida F16‐10 y Calkiní F15‐9‐
12 y su columna general incluye, en orden ascendente, a las formaciones Icalché y Chichén Itzá (del
Paleoceno‐Eoceno); una unidad del Oligoceno; las Formaciones Bacalar, Estero Franco y Riello
Puerto (Mioceno superior‐Plioceno) y calizas de moluscos del Pleistoceno‐Holoceno.
La Plataforma de Yucatán tiene un basamento cristalino pre‐Mesozoico documentado mediante
pozos de exploración profunda de Pemex (López‐Ramos, 1973). En el pozo Yucatán no. 1 se encontró
una riolita porfídica a 3200 m de profundidad fechada en el Silúrico y en el pozo Yucatán no. 4 se
encontró una cuarcita metamorfoseada subyaciendo a los equivalentes de lechos rojos del Triásico‐
Jurásico. Dado que la Plataforma de Yucatán es un bloque sin perturbaciones estructurales, el
Cretácico tampoco se encuentra expuesto y sólo se ha identificado con los pozos de exploración
(López‐Ramos, 1973). Estos depósitos están compuestos por anhidritas, calizas, dolomitas e
intercalaciones de bentonitas y material piroclástico. Hacia la base de la sección se han reconocido
evaporitas del Cretácico Inferior; mientras que el Cretácico Superior y en el Cenozoico están
representados por bancos calcáreos (Morán‐Zenteno, 1994). Estos depósitos del Cretácico Superior
corresponden con facies marinas someras de laguna restringida y tras‐arrecife y carece de facies
marinas profundas.
11
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
FIGURA 1 MAPA GEOLÓGICO GENERAL DE LA PENÍNSULA DE YUCATÁN DONDE SE MUESTRA EL EJE DEL TRAMO 3
Los depósitos cenozoicos de la plataforma están representados por secuencias calcáreas y
dolomíticas con intercalaciones de evaporitas. El Paleoceno inferior‐Eoceno indiferenciado está
representado por calizas cristalinas, silicificadas o recristalizadas, y dolomitas con pedernal negro
secundario, pertenecientes a la Formación Icaiché. Estos depósitos afloran al sur de la península.
El Eoceno inferior‐medio está representado por la Formación Chichén Itzá (TeCz‐Mg), la cual
consiste en calizas microcristalinas con estratificación masiva. La mayoría de los afloramientos
tienen microfauna que sugiere su edad eocénica. El contenido fosilífero, entre los que se encuentran
foraminíferos y algas, indica un ambiente de poco tirante de agua. Por otro lado, el Eoceno superior
está representado por el miembro Chumbec, de la Formación Chichén Itzá. Este miembro consiste
en calizas blancas con textura sacaroidea, las cuales contienen fauna de miliólidos, con lo cual se
restringe su edad. Su ambiente de depósito es de plataforma somera.
El Oligoceno se ha reconocido con los pozos de exploración y también en los depósitos explotados
en las cercanías de la ciudad de Mérida. Los depósitos del Oligoceno inferior consisten en
calcarenitas de estratificación gruesa (de 1 a 1.5 m), pobremente estratificadas, con fauna de
foraminíferos de ambiente somero. El Oligoceno superior incluye calizas blancas y calcarenitas que
12
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
se caracterizan por tener un gran número de fósiles de conchas de moluscos bien preservados,
además de foraminíferos de agua somera.
Cubriendo a la unidad anterior se encuentran depósitos del Mioceno‐Plioceno. Estos depósitos
están representados por calizas blancas cristalinas, coquinas y conglomerados de las formaciones
Bacalar, Estero Franco y Riello Puerto. Las formaciones Bacalar y Estero Franco afloran en la costa
sur de la península; mientras que la Formación Riello Puerto aflora en el norte. Esta última se
extiende por gran parte de la Península de Yucatán, está representada por coquinas con moluscos
de color gris‐blanco a rosado y se caracteriza por su abundante contenido fosilífero de
foraminíferos, algas y ostrácodos.
Finalmente, el Cuaternario está representado por depósitos del Pleistoceno conformados por
areniscas poco consolidadas, constituidas por fragmentos de gasterópodos, pelecípodos y ostras, y
calizas de moluscos. Estos depósitos afloran discontinuamente en la margen oriental de la
Península. Los depósitos del Holoceno incluyen depósitos lacustres, constituidos por arcillas, lodo
calcáreo, arenas y limos ricos en materia orgánica que afloran en las zonas lagunares; y depósitos
de limo‐arcillas ricos en materia orgánica de ambiente palustre, los cuales afloran en las márgenes
de plataforma. Finalmente, los depósitos de litoral están representados por arenas blancas con
fragmentos de ostras, bivalvos y gasterópodos.
4.2. ESTRATIGRAFÍA Y LITOLOGÍA
El subsuelo de la Península de Yucatán está constituido por una secuencia de depósitos calcáreos
de origen marino, del Terciario superior, la cual ha estado expuesta a subsidencia continua. Los
sedimentos terciarios, presentan echados muy suaves, con un espesor aproximado de 120 metros,
que corresponden a calizas masivas cristalinas, cavernosas y con una buena permeabilidad. Estas
calizas cristalinas descansan sobre calizas y margas, con espesor de cientos de metros y muy
impermeables.
La Península de Yucatán presenta la característica de tener pequeños horizontes de suelo (20 cm
aprox.) compuesta de calizas duras con proceso de disolución que cementan fragmentos de
sedimentos calcáreos y conchas (González; 1999). También se presenta una caliza suave y blanca
denominada sascab (tierras blancas), siendo una característica distintiva del área de estudio.
El área de estudio comprende un paquete de rocas carbonatadas, que abarcan desde el Cretácico
al reciente. La unidad más antigua expuesta corresponde a la Formación Chichén‐Itzá (TeCz‐Mg),
que se divide en dos miembros, el miembro Pisté y el miembro Chumbec. También se encuentra
presente la Unidad del Oligoceno (TeMg‐Lu‐Cl) y la Formación Riello Puerto (TmplCz‐Cq) del
Mioceno‐Plioceno.
13
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Dentro del área en la que se ubica el tramo de estudio, de acuerdo con las cartas geológicas
publicadas por el Servicio Geológico Mexicano (SGM) y la literatura revisada, se pueden definir las
siguientes litologías por formaciones y unidades:
‐ Formación Chichén Itzá (TeCz‐Mg). es la unidad más antigua que aflora sobre el tramo
3. Constituida por un paquete de rocas carbonatadas, conformado por grainstone,
wackestone, brecha calcárea y horizontes de margas de edad Eoceno. Se divide en dos
miembros:
‐ Miembro Pisté (TeCz‐Mg): de edad del Eoceno Medio, compuesto por calizas
de color blanco a amarillento, a menudo masiva y con microfracturas;
presenta abundante microfauna de foraminíferos y algas calcáreas. El
miembro Pisté se encuentra ampliamente distribuido en la porción central de
la Península de Yucatán.
‐ Miembro Chumbec (TeCz‐Lu): corresponde al Eoceno superior y está
constituido por calizas muy blancas y cristalinas de aspecto de un mármol
sacaroideo. Sin embargo, este miembro no se encuentra presente sobre la vía
del tren. El espesor estimado de este miembro es de 100 m y descansa sobre
el miembro Pisté.
‐ Unidad del Oligoceno (TeMg‐Lu‐Cl): compuesta por calizas‐coquinas que
cubren Chichén Itzá, comprende un paquete de mudstone, grainstone,
packstone y boundstone.
‐ Formación Riello Puerto (TmplCz‐Cq). de edad Mioceno‐Plioceno. Constituida por
mudstone, wackestone, grainstone, packstone, boundstone y brechas calcáreas mal
clasificadas. Esta es la unidad más joven y con mayor presencia en el tramo 3
14
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
FIGURA 2 COLUMNA ESTRATIGRÁFICA GENERAL PARA EL TRAMO 3, CON BASE EN LA CARTA GEOLÓGICO‐MINERA MÉRIDA
F16‐10
Otra unidad que no está formalmente descrita es el material sascab, o “tierra blanca” en maya,
definido bibliográficamente de dos maneras. La primera la define como “roca calcárea no
consolidada, cuya consistencia parece indicar que el lodo calcáreo del cual procede se depositó
como calcita y, por lo tanto, no ocurrió la cristalización de aragonito a calcita” (Martínez, 2003). La
segunda definición dice que dicho material ha sido asociado también a la alteración química de rocas
calizas, tratándose de un suelo o coraza calcárea reblandecida, en un espesor de varios metros. La
caracterización del “sascab”, de acuerdo a la información levantada en los trabajos de campo se
define como un material de color blancuzco, areno‐arcilloso al tacto, de tamaño de grano medio a
fino, que se presenta desde la superficie o intercalado con estratos de roca caliza con variaciones
laterales y verticales. Al no ser una unidad formalmente descrita, ni de distribución continua, no se
representa en los mapas, pero se dibuja en las secciones como material arcillo‐arenoso, aunque la
proporción de material fino (arcilla y limo) y arenas varía de una localidad a otra.
15
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
De acuerdo con las cartas geológicas del SGM y la información bibliográfica, a lo largo del área de
estudio afloran tanto la Formación Chichén Itzá, miembro Pisté (TeCz‐Mg) como la Formación Riello
Puerto (TmplCz‐Cq).
Derivado de los estudios realizados en campo se han identificado y clasificado las siguientes
unidades geotécnicas.
4.2.1. Unidad geotécnica U1. Suelo cuaternario cohesivo medio. Arcillas y limos.
Esta unidad geotécnica está constituida principalmente por suelos arcillo arenosos que se localizan
principalmente en las pequeñas microcuencas cuaternarias intersecadas por el trazo. Presenta un
espesor reducido, en general inferior a un metro.
4.2.2. Unidad geotécnica U2. Suelo residual granular medio. Arenas con algo de limos y gravas.
La unidad U2 está constituida por suelos residuales de naturaleza predominantemente granular,
producto de la alteración del sustrato rocoso. Se localiza principalmente en los metros más
superficiales y ocasionalmente en profundidad en zonas alteradas y reblandecidas dentro del
conjunto de suelos denominados localmente como “sascab”.
4.2.3. Unidad geotécnica U3. Suelo residual cohesivo muy duro.
La unidad U3 está constituida por suelos residuales de naturaleza predominantemente cohesiva,
producto de la alteración del sustrato rocoso. Se localiza principalmente en los metros más
superficiales y ocasionalmente en profundidad en zonas alteradas y reblandecidas dentro del
conjunto de suelos denominados localmente como “sascab”.
4.2.4. Unidad geotécnica U4. Suelo residual granular muy denso. Arenas con algo de limos y
gravas.
Esta unidad geotécnica es de naturaleza y composición similar a la unidad U2, pero presenta una
compacidad muy densa.
4.2.5. Unidad geotécnica U5. Relleno antrópico.
Esta unidad se corresponde con los rellenos antrópicos utilizados para la construcción de la vía
ferroviaria actual. Se trata de materiales de naturaleza diversa que constituyen el balasto, sub‐
balasto y terracería de los terraplenes de la vía existente.
4.2.6. Unidad geotécnica U6. Calizas coquinas.
La unidad geotécnica U6 se corresponde con las calizas coquinas medianamente fracturadas que
presentan disolución. Tienen una textura rugosa y se encuentran moderadamente consolidadas. Sus
estructuras fosilíferas están, en general, bastante bien preservada, presentando especímenes de
hasta 10 cm.
16
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
4.2.7. Unidad geotécnica U7. Calizas masivas.
Las calizas masivas de la unidad U7 son más duras, resistentes y competentes que las de la unidad
U6. Presentan escaso contenido fósil y se encuentran ocasionalmente zonas con recristalización. Se
observan lentejones arcillosos intercalados entre los paquetes calcáreos.
Para conocer mayor información sobre la estratigrafía y unidades geotécnicas se puede consultar el
documento TMPE‐3‐VA‐GEO‐INF‐(número dependiendo el tramo).
4.3. MECÁNICA DE SUELOS
4.4. TRABAJOS REALIZADOS
El estudio geotécnico de los materiales presentes en el tramo se ha realizado mediante la ejecución
de ensayos tanto intrusivos como no intrusivos y utilizando numerosas técnicas diferentes.
En el caso de los ensayos intrusivos se han realizado sondeos de muestreo mixto, sondeos de avance
controlado y pozos a cielo abierto.
En cuanto a los ensayos no intrusivos, se han utilizado diferentes técnicas geofísicas como la
realización de perfiles de tomografía eléctrica y barridos de georradar, con el fin de definir la
existencia de cavidades.
Los estudios realizados en todos los tramos se presentan en la Tabla 2.
TABLA 2 ESTUDIOS GEOTÉCNICOS REALIZADOS POR SUBTRAMO.
POZOS
SONDEOS ESTACIONES AVANCE PERFIL DE ENSAYOS
NO. SUBTRAMO A CIELO GEORRADAR DONWHOLE
MIXTOS GEOMECÁNICAS CONTROLADO TOMOGRAFÍA PIESOMÉTRICOS
ABIERTO
1 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
4 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
5071+500 –
5 6 22 3 ‐ ‐ ‐ ‐ ‐
6006+000
6 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
6017+000 AL
7 15 31 1 ‐ ‐ ‐ ‐ ‐
6030+000
17
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
POZOS
SONDEOS ESTACIONES AVANCE PERFIL DE ENSAYOS
NO. SUBTRAMO A CIELO GEORRADAR DONWHOLE
MIXTOS GEOMECÁNICAS CONTROLADO TOMOGRAFÍA PIESOMÉTRICOS
ABIERTO
8 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
6036+800–
9 14 76 3 ‐ ‐ ‐ ‐ ‐
6067+000
10 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
18
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
4.5. RESUMEN DE DATOS GEOTÉCNICOS
A continuación, se presenta el resumen por tramo de los datos geotécnicos consecuencia de la campaña geotécnica realizada
TABLA 3 RESUMEN DE DATOS GEOTÉCNICOS DEL TRAMO [ADMINISTRADOR]
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(MH) Limo de alta compresibilidad; mezcla de
2 1.2 Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, C
limo de alta plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
4 5002+745 5003+490 física y química medianamente avanzadas, ‐ 3 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.48 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
5 5003+490 5004+310 ‐ 3 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.43 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
6 5004+310 5004+490 (SM) Arena limosa muy compacta; mezcla de <2.0 3 3:2
2 0.80 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
20
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
21
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.1 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(CH) Arcilla de alta compresibilidad; mezcla de
2 1.6 Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, C
arcilla de alta plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
10 5005+680 5005+890 física y química medianamente avanzadas, ‐ 3 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
11 5005+890 5007+180 ‐ 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.23 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
12 5007+180 5007+360 (MH) Limo de alta compresibilidad; mezcla de ‐ 3 3:2
2 0.80 Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, C
limo de alta plasticidad, arena y grava.
22
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.55 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
13 5007+360 5008+155 ‐ 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.5 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
2 0.6 (GM) Grava limosa; mezcla de grava, arena y limo. Desperdicio 0.96 0.91 0.87 100 0 0 1:3 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
14 5008+155 5008+380 medianamente cementadas, fracturadas. Al ‐ 3 3:2
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
15 5008+380 5009+090 1 0.20 Tierra vegetal Despalme 100 0 0 ‐ 2:1 3 3:2 A, B, C
23
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(CL) Arcilla de baja compresibilidad; mezcla de
2 1.0 Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, C
arcilla de baja plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
16 5009+090 5009+200 física y química medianamente avanzadas, ‐ 4 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.53 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
17 5009+200 5009+850 <2.0 3 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.28 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
2 1.0 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
18 5009+850 5011+420 <2.0 2 3:2
(CL) Arcilla de baja compresibilidad; mezcla de
3 2.5 Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, C
arcilla de baja plasticidad, arena y grava.
24
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.4 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
19 5011+420 5011+940 <2.0 3 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 60 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 A, B, C
(GC/SC) Grava y arena arcillosa; mezclas de grava, 2:1
2 1.0 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arena y arcilla.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
20 5011+940 5012+420 física y química medianamente avanzadas, <2.0 1 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 1.0 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
21 5012+420 5012+600 arcilla. <2.0 1 3:2
(SM) Arena limosa muy compacta; mezcla de
3 0.45 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
25
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 A, B, C
2:1
2 1.3 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
22 5012+600 5013+235 medianamente cementadas, fracturadas. Al <2.0 1 3:2
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.00 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 A, B, C
2:1
2 1.5 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
(CL) Arcilla de baja compresibilidad; mezcla de
3 1.3 Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, C
arcilla de baja plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
23 5013+235 5013+390 física y química medianamente avanzadas, <2.0 1 3:2
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Compactado 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 A, B, C
24 5013+390 5014+060 <2.0 2:1 1 3:2
2 0.35 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
26
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
27
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
3 0.92 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 A, B, C
2:1
2 0.5 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
(ML) Limo de baja compresibilidad; mezcla de
3 1.2 limo de baja plasticidad, arena y grava; polvo de Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, D, J
roca.
Roca sedimentaria clástica (Rsc). Caliza
28 5016+600 5017+340 mediantamente intemperizadas con alteración <2.0 2 3:2
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.4 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 0.7 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arcilla.
(SM) Arena limosa muy compacta; mezcla de
3 0.95 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
29 5017+340 5017+680 mediantamente intemperizadas con alteración <2.0 2 3:2
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
30 5017+680 5018+040 1 0.4 Tierra vegetal Despalme 100 0 0 <2.0 2:1 2 3:2 A, B, C
28
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
(GC) Grava arcillosa; mezclas de grava, arena y
2 1.7 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arcilla.
(ML) Limo de baja compresibilidad; mezcla de
3 0.5 limo de baja plasticidad, arena y grava; polvo de Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, C
roca.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.32 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 0.52 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arcilla.
(GM/GP) Grava limosa mal graduada; mezcla de
3 2 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
grava, arena y limo.
Roca sedimentaria clástica (Rsc). Caliza
31 5018+040 5019+700 mediantamente intemperizadas con alteración <2.0 1 3:2
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.39 Tierra vegetal Despalme 100 0 0 A, B, C
32 5019+700 5021+560 (GM/GP) Grava limosa mal graduada; mezcla de <2.0 2:1 3 3:2
2 0.80 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
grava, arena y limo.
29
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.45 Tierra vegetal Despalme 100 0 0 A, B, C
(GM/GP) Grava limosa mal graduada; mezcla de 2:1
2 1.6 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
grava, arena y limo.
3 0.4 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87 100 0 0 1:1 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
33 5021+560 5021+920 física y química medianamente avanzadas, 9 3 3:2
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.1 Tierra vegetal Despalme 100 0 0 A, B, C
(GM/GP) Grava limosa mal graduada; mezcla de 2:1
2 2.0 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
grava, arena y limo.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
34 5021+920 5022+280 física y química medianamente avanzadas, ‐ 2 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.23 Tierra vegetal Despalme 100 0 0 A, B, C
(SC) Arena arcillosa; mezclas de arena, grava y 2:1
2 1.5 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
35 5022+280 5022+490 arcilla. ‐ 1 3:2
(SM) Arena limosa muy compacta; mezcla de
3 Indef. Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
30
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
1 0.3 Tierra vegetal Despalme 100 0 0 A, B, C
(SC) Arena arcillosa; mezclas de arena, grava y 2:1
2 1.2 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arcilla.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
36 5022+490 5023+100 física y química medianamente avanzadas, <2.0 1 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
31
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
1 0.3 Tierra vegetal Despalme 100 0 0 A, B, C
(GM/GP) Grava limosa bien graduada; mezcla de 2:1
2 0.6 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
grava, arena y limo.
(SM) Arena limosa muy compacta; mezcla de
3 0.4 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
39 5023+770 5023+900 mediantamente intemperizadas con alteración <2.0 1 3:2
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
40 5023+900 5024+640 <2.0 3 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.25 Tierra vegetal Despalme 100 0 0 A, B, C
2:1
2 0.7 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
(GC) Grava arcillosa; mezclas de grava, arena y
3 0.3 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, C
arcilla.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
41 5024+640 5025+000 física y química medianamente avanzadas, <2.0 1 3:2
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 A, B, C
42 5025+000 5026+100 <2.0 2:1 2 3:2
2 0.9 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
32
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.18 Tierra vegetal Despalme 100 0 0 A, B, C
2:1
2 0.5 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
(SM) Arena limosa muy compacta; mezcla de
3 0.4 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
43 5026+100 5027+020 física y química medianamente avanzadas, <2.0 3 3:2
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.26 Tierra vegetal Despalme 100 0 0 A, B, C
2:1
2 0.2 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
44 5027+020 5027+750 medianamente cementadas, fracturadas. Al ‐ 3 3:2
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.55 Tierra vegetal Despalme 100 0 0 A, B, C
2:1
2 1.4 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
45 5027+750 5028+490 <2.0 2 3:2
(CL) Arcilla de baja compresibilidad; mezcla de
3 0.5 Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, D, J
arcilla de baja plasticidad, arena y grava.
33
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.4 Tierra vegetal Despalme 100 0 0 A, B, C
2:1
2 0.4 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
46 5028+490 5028+920 medianamente cementadas, fracturadas. Al ‐ 3 3:2
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.5 Tierra vegetal Despalme 100 0 0 A, B, C
(GM/GP) Grava limosa bien graduada; mezcla de 2:1
2 1.25 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
grava, arena y limo.
(SM) Arena limosa muy compacta; mezcla de
3 0.45 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
47 5028+920 5029+440 mediantamente intemperizadas con alteración ‐ 2 3:2
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.6 Tierra vegetal Despalme 100 0 0 A, B, C
48 5029+440 5029+740 (GM/GP) Grava limosa bien graduada; mezcla de <2.0 2:1 3 3:2
2 1 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
grava, arena y limo.
34
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.6 Tierra vegetal Despalme 100 0 0 A, B, C
(GM/GP) Grava limosa bien graduada; mezcla de 2:1
2 0.50 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
grava, arena y limo.
3 0.20 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
49 5029+740 5030+065 física y química medianamente avanzadas, <2.0 2 3:2
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.25 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 0.8 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arcilla.
3 0.5 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
50 5030+065 5030+940 física y química medianamente avanzadas, ‐ 3 3:2
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.29 Tierra vegetal Despalme 100 0 0 A, B, C
51 5030+940 5034+200 (GC) Grava arcillosa; mezclas de grava, arena y <2.0 2:1 3 3:2
2 0.5 Desperdicio 0.93 0.88 0.83 100 0 0 A, B, C
arcilla.
35
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
36
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
(SM) Arena limosa muy compacta; mezcla de
3 0.3 Compactado 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 1.3 Desperdicio 0.93 0.88 0.83 100 0 0 A, B, C
arcilla.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
55 5036+000 5036+360 física y química medianamente avanzadas, <2.0 3 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.4 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 1.3 Desperdicio 0.93 0.88 0.83 100 0 0 A, B, C
arcilla.
(ML) Limo de baja compresibilidad; mezcla de
3 0.3 limo de baja plasticidad, arena y grava; polvo de Desperdicio 0.92 0.87 0.83 100 0 0 1:3 A, B, D, J
roca.
Roca sedimentaria clástica (Rsc). Caliza
56 5036+360 5036+500 mediantamente intemperizadas con alteración ‐ 3 3:2
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
57 5036+500 5041+200 1 0.25 Tierra vegetal Despalme 100 0 0 ‐ 2:1 3 3:2 A, B, C
37
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
(GC) Grava arcillosa; mezclas de grava, arena y
2 1.2 Desperdicio 0.93 0.88 0.83 100 0 0 A, B, C
arcilla.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 1.2 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arcilla.
(CH) Arcilla de alta compresibilidad; mezcla de
3 0.6 Desperdicio 100 0 0 1:3 A, B, C
arcilla de alta plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
58 5041+200 5041+250 mediantamente intemperizadas con alteración <2.0 2 3:2
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.18 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 2.1 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arcilla.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
59 5041+250 5042+600 física y química medianamente avanzadas, <2.0 2 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.35 Tierra vegetal Despalme 100 0 0 A, B, C
60 5042+600 5042+800 ‐ 2:1 2 3:2
2 0.6 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
38
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
(SM) Arena limosa muy compacta; mezcla de
3 1.2 Compactado 0.96 0.91 0.87 100 0 0 1:3 A, B, D, J
arena, grava y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.35 Tierra vegetal Despalme 100 0 0 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y 2:1
2 0.7 Compactado 0.93 0.88 0.83 100 0 0 A, B, D, J
arcilla.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
61 5042+800 5043+000 física y química medianamente avanzadas, <2.0 2 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
TABLA 4 RESUMEN DE DATOS GEOTÉCNICOS DEL TRAMO 5071+500 – 6006+000
39
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
(ML) Limo de baja compresibilidad; mezcla de
2 1.2 limo de baja plasticidad, arena y grava; polvo de Desperdicio 0.93 0.88 0.83 100 0 0 1:3 A, B, C
roca.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.4 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 5071+580 5072+660 <2.0 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.25 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(MH) Limo de alta compresibilidad; mezcla de
2 0.79 A, B, C
limo de alta plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
4 5072+660 5072+760 física y química medianamente avanzadas, <2.0 3 3:2
medianamente cementadas, fracturadas. Al
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
5 5072+760 6000+600 <2.0 2 3:2
2 Indef. física y química medianamente avanzadas, Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianamente cementadas, fracturadas. Al
excavarse se obtendrán fragmentos chicos y
40
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y
2 0.55 Compactado 1.02 0.96 0.91 100 0 0 1:3 A, B, D, J
arcilla. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
6 6000+600 6000+660 física y química medianamente avanzadas, <2.0 2 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
7 6000+660 6000+800 <2.0 2 03:02
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
2 0.45 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 1.02 0.96 0.91 100 0 0 1:3 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
8 6000+800 6000+880 medianamente cementadas, fracturadas. Al <2.0 2 3:2
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
9 6000+880 6001+180 1 0.24 Tierra vegetal Despalme 100 0 0 <2.0 2:1 3 3:2 A, B, C
41
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.12 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(ML) Limo de baja compresibilidad; mezcla de
2 0.42 limo de baja plasticidad, arena y grava; polvo de Desperdicio 0.93 0.88 0.83 100 0 0 1:3 A, B, C
roca.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
10 6001+180 6001+220 física y química medianamente avanzadas, <2.0 3 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.27 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
11 6001+220 6002+830 <2.0 10 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
12 6002+830 6002+980 (SM) Arena limosa muy compacta; mezcla de ‐ 10 3:2
2 0.6 Compactado 1.02 0.96 0.91 100 0 0 1:3 A, B, D, H
arena, grava y limo. Deseable
42
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.16 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
13 6002+980 6003+560 ‐ 10 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y
2 0.95 Compactado 1.02 0.96 0.91 100 0 0 1:3 A, B, D, J
arcilla. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
14 6003+560 6003+620 física y química medianamente avanzadas, 5 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
15 6003+620 6003+900 2 3:2
2 Indef. medianamente cementadas, fracturadas. Al Bandeo 1.07 5 80 15 1:3 A, B, D, N
excavarse se obtendrán fragmentos chicos y
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
43
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.18 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y
2 0.70 Compactado 1.02 0.96 0.91 100 0 0 1:3 A, B, D, J
arcilla. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
16 6003+900 6004+615 física y química medianamente avanzadas, <2.0 2 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.4 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
17 6004+615 6005+000 medianamente cementadas, fracturadas. Al <2.0 3 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 5 80 15 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
TABLA 5 RESUMEN DE DATOS GEOTÉCNICOS DEL TRAMO 6017+000 AL 6030+000
44
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.25 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(CL) Arcilla muy firme de baja compresibilidad;
2 0.45 mezcla de arcilla de baja plasticidad, arena y Desperdicio 0.92 0.87 0.83 100 0 0 A, B, C
grava; polvo de roca.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
2 6019+070 6019+160 física y química medianamente avanzadas, ‐ 3 3:2
1:3
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.35 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 6019+160 6020+890 ‐ 3 3:2
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.35 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(CL) Arcilla muy firme de baja compresibilidad;
4 6020+890 6020+920 ‐ 3 3:2
2 0.35 mezcla de arcilla de baja plasticidad, arena y Desperdicio 0.95 0.90 0.85 100 0 0 1:3 A, B, C
grava; polvo de roca.
45
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.18 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
5 6020+920 6021+455 <2.0 3 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(SM) Arena limosa muy compacta; mezcla de
2 2.7 Compactado 0.97 0.92 0.87 100 0 0 A, B, D, J
arena, grava y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
6 6021+455 6021+775 física y química medianamente avanzadas, <2.0 3 3:2
medianamente cementadas, fracturadas. Al 1:3
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
7 6021+775 6022+095 1 0.3 Tierra vegetal Despalme 100 0 0 ‐ 2:1 3 3:2 A, B, C
46
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(SM) Arena limosa muy compacta; mezcla de
2 0.6 Compactado 0.97 0.92 0.87 100 0 0 A, B, D, J
arena, grava y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
8 6022+095 6022+170 física y química medianamente avanzadas, <2.0 2 3:2
medianamente cementadas, fracturadas. Al 1:3
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.35 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
9 6022+170 6024+270 <2.0 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
10 6024+270 6025+580 ‐ 3 3:2
2 1.03 (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.92 0.87 0.83 100 0 0 2:1 A, B, D, J
47
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(CL) Arcilla de baja compresibilidad; mezcla de
2 0.4 Compactado 0.92 0.87 0.83 100 0 0 2:1 A, B, D, J
arcilla de baja plasticidad, arena y grava.
(SP‐SM) Arena mal graduada muy compactada;
3 0.25 mezcla de arena y grava con poco o nada de finos. Compactado 0.97 0.92 0.87 100 0 0 A, B, D, J
Deseable
Roca sedimentaria clástica (Rsc). Caliza
11 6025+580 6025+660 mediantamente intemperizadas con alteración ‐ 2 3:2
física y química medianamente avanzadas, 1:3
medianamente cementadas, fracturadas. Al
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.33 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
12 6025+660 6027+565 física y química medianamente avanzadas, <2.0 3 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
13 6027+565 6027+990 1 0.27 Tierra vegetal Despalme 100 0 0 ‐ 2:1 3 3:2 A, B, C
48
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
(GM) Grava limosa muy compactada; mezcla de
3 4.4 Compactado 0.97 0.92 0.87 100 0 0 A, B, D, J
grava, arena y limo. Deseable
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al 1:3
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.35 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
14 6027+990 6028+000 física y química medianamente avanzadas, ‐ 2 3:2
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.35 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
49
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
1 0.15 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(GC) Grava arcillosa; mezclas de grava, arena y
2 0.35 Compactado 0.92 0.87 0.83 100 0 0 2:1 A, B, D, J
arcilla.
(GC) Grava arcillosa muy compactada; mezclas de
3 0.45 Compactado 0.97 0.92 0.87 100 0 0 A, B, D, J
grava, arena y arcilla. Deseable
Roca sedimentaria clástica (Rsc). Caliza
17 6029+255 6029+340 mediantamente intemperizadas con alteración <2.0 2 3:2
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al 1:3
4 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
50
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 90% 95% 100% Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
medianamente cementadas, fracturadas. Al
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 60 40 1:3 A, B, D, N
medianos, con menos del 10% de otros
fragmentos o de suelo (Fcm‐G/S). Forma
angulosa, textura rugosa y alterados como grado
de alteración.
TABLA 6 RESUMEN DE DATOS GEOTÉCNICOS DEL TRAMO 6036+800– 6067+000
51
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
2 0.3 (GM) Grava limosa; mezcla de grava, arena y limos Compactado 0.97 0.92 0.88 100 0 0 1:3 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
4 6041+510 6041+550 <2 1:3 Talud 4 3:2
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.25 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
5 6041+550 6044+185 <2 izquierdo 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
52
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.34 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
7 6044+320 6047+000 <2 izquierdo 5 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
(SW/SM) Arena bien graduada; mezcla de arena,
1 0.4 Compactado 0.97 0.92 0.88 10 0 0 2:1 A, B, C, J
gravas y limo. Deseable.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
8 6047+000 6047+060 <2 1:3 Talud 4 3:2
medianamente cementadas, fracturadas. Al
izquierdo
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.4 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
9 6047+060 6047+510 <2 izquierdo 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
53
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
1 0.30 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(MH) Limo de alta compresibilidad; mezcla de limo
2 0.60 Desperdicio 0.96 0.91 0.87 100 0 0 1:3 A, B, C
de alta plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
10 6047+510 6047+580 física y química medianamente avanzadas, <2 3 3:2
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.32 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
11 6047+580 6052+420 <2 izquierdo 5 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.70 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(GP‐GM) Grava mal graduada; mezcla de grava
2 0.60 Compactado 0.97 0.92 0.88 100 0 0 1:3 A, B, D, J
arena con poco o nada de finos. Deseable.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
12 6052+420 6052+490 física y química medianamente avanzadas, <2 3 3:2
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
13 6052+490 6055+100 1 0.14 Tierra vegetal Despalme 100 0 0 <2 2:1 4 3:2 A, B, C
54
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(CH) Arcilla de alta compresibilidad ; mezcla de
2 0.4 Desperdicio 0.96 0.91 0.87 100 0 0 1:3 A, B, C
arcilla de alta plasticidad, arena y grava
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
14 6055+100 6055+150 física y química medianamente avanzadas, <2 4 3:2
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.25 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
15 6055+150 6056+170 <2 izquierdo 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.20 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
16 6056+170 6056+220 (MH) Limo de alta compresibilidad; mezcla de limo ‐ 4 3:2
2 1.2 Desperdicio 0.96 0.91 0.87 100 0 0 1:3 A, B, C
de alta plasticidad, arena y grava.
55
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.4 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
17 6056+220 6056+770 <2 izquierdo 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
(MH) Limo de alta compresibilidad; mezcla de limo
1 1.00 Desperdicio 0.96 0.91 0.87 100 0 0 1:3 A, B, C
de alta plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
18 6056+770 6056+860 <2 1:3 Talud 3 3:2
medianamente cementadas, fracturadas. Al
izquierdo
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.1 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
19 6056+860 6057+270 <2 izquierdo 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
56
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(MH) Limo de alta compresibilidad; mezcla de limo
2 1.0 Desperdicio 0.96 0.91 0.87 100 0 0 1:3 A, B, C
de alta plasticidad, arena y grava.
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
20 6057+270 6057+340 física y química medianamente avanzadas, ‐ 3 3:2
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.31 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
21 6057+340 6061+940 <2 izquierdo 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.3 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(CH) Arcilla de alta compresibilidad ; mezcla de
2 0.9 Desperdicio 0.96 0.91 0.87 100 0 0 1:3 A, B, C
arcilla de alta plasticidad, arena y grava
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
22 6061+940 6061+980 física y química medianamente avanzadas, <2 3 3:2
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
23 6061+980 6063+170 1 0.1 Tierra vegetal Despalme 100 0 0 <2 2:1 4 3:2 A, B, C
57
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
2 0.3 (GM) Grava limosa; mezcla de grava, arena y limos Compactado 0.97 0.92 0.88 100 0 0 1:3 A, B, D, J
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
24 6063+170 6063+210 <2 1:3 Talud 3 3:2
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.33 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
25 6063+210 6065+560 <2 izquierdo 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
58
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.27 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
27 6065+710 6066+080 <2 izquierdo 4 3:2
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
1 0.2 Tierra vegetal Despalme 100 0 0 2:1 A, B, C
(CL) Arcillas de alta compresibilidad; mezcla de
2 0.3 Desperdicio 0.96 0.91 0.87 100 0 0 1:3 A, B, C
arcilla de alta plasticidad, arena y grava
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
28 6066+080 6066+120 física y química medianamente avanzadas, <2 2 3:2
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
3 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
29 6066+120 6068+000 1 0.3 Tierra vegetal Despalme 100 0 0 <2 2:1 4 3:2 A, B, C
59
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Estrato Tratamiento CVV Clasif. Presupuestal Corte Terraplén
Nº Clasificación del suelo SCT Observaciones
De Hasta Número Espesor (m) probable 0.90 0.95 1.00 Bandeo A B C Hmax (m) Talud (H:V) Hmax (m) Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza
mediantamente intemperizadas con alteración
física y química medianamente avanzadas,
1:3 Talud
medianamente cementadas, fracturadas. Al
izquierdo
2 Indef. excavarse se obtendrán fragmentos chicos y Bandeo 1.07 0 50 50 A, B, D, N
1:2 Talud
medianos, con menos del 10% de otros
derecho
fragmentos o de suelo (Fcm‐G/S). Forma angulosa,
textura rugosa y alterados como grado de
alteración.
60
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
4.5.1. Observaciones particulares a las tablas de datos geotécnicos
A. En todos los casos el cuerpo de terraplén, se compactará al 90% o se bandeará según sea el caso;
las capas de transición y subrasante se compactarán al 95% y 100% respectivamente; los grados de
compactación son con respecto a la prueba AASHTO Stándar ó Modificada dependiendo de la
granulometría del material, por lo que quedará a juicio del Laboratorio de Control, aplicar la prueba
que corresponda.
B. En todos los casos, cuando no se indique otra cosa, el terreno natural, después de haberse
efectuado el despalme correspondiente, el piso descubierto deberá compactarse al 90% de su Peso
Volumétrico Seco Máximo (P.V.S.M.) en una profundidad mínima de 0.20 m ó bandearse según sea
el caso.
C. Material que, por sus características, NO debe utilizarse ni en la construcción del cuerpo de
terraplén.
D. Material que, por sus características, solo puede utilizarse en la formación del cuerpo del
terraplén, mismo que deberá compactarse al 90% de su Peso Volumétrico Seco Máximo (P.V.S.M.)
ó bandearse según sea el caso.
E. Material que, por sus características, puede utilizarse en la formación del cuerpo de terraplén y
la capa de transición (subyacente).
F. Material que, por sus características, puede utilizarse en la formación del cuerpo del terraplén, la
capa de transición y la capa subrasante.
G. En terraplenes formados con este material, se deberá proyectar una capa de transición de 0.20
m. de espesor, cuando la altura de estos sea menor de 0.80 m. y cuando sea mayor, la transición
será de 0.70 m.; y en ambos casos se proyectará la capa subrasante de 0.30 m. de espesor.
H. En terraplenes formados en este material, se deberá proyectar una capa de transición de 0.70 m.
de espesor como mínimo y la capa subrasante de 0.30
m. de espesor, compactadas al 95 y 100% respectivamente, las cuales se construirán con material
precedente del banco de préstamo más cercano.
I. En cortes formados en este material, la cama de corte, se deberá compactar al 95% de su Peso
Volumétrico Seco Máximo (P.V.S.M.), en una profundidad mínima de 0.20 m. y se deberá proyectar
una capa subrasante de 0.30 m. de espesor, compactándola al 100%, con material procedente del
banco de préstamo más cercano
J. En este tramo se deberá proyectar en cortes y terraplenes bajos, una capa
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
de transición de 0.70 m. de espesor como mínimo y una capa subrasante de 0.30 m. de espesor; en
caso de ser necesario se deberán abrir cajas con profundidad suficiente para alojar las capas citadas;
ambas capas se construirán con material procedente del banco de préstamo más cercano.
K. En cortes, se deberá escarificar los 0.15 m. superiores y acamellonar; la superficie descubierta, se
deberá compactar al 100% de su Peso Volumétrico Seco Máximo (P.V.S.M.), en un espesor mínimo
de 0.15 m. con lo que quedará formada la primera capa subrasante, con el material acamellonado
se construirá la segunda capa subrasante, misma que deberá compactarse también al 100% de su
P.V.S.M.
L. En cortes formados en este material, se proyectará únicamente una capa subrasante de 0.30 m.
de espesor mínimo, compactándola al 100% y se construirá con material procedente del banco de
préstamo más cercano.
M. En cortes formados en este material, se escarificarán los primeros 0.30 m. a partir del nivel
superior de subrasante, se acamellonará el material producto del escarificado y se compactará la
superficie descubierta al 95%, hasta una profundidad de 0.20 m.; Posteriormente, con el material
acamellonado se construirá la capa subrasante de 0.30 m. de espesor.
N. En el caso de cortes construidos en este material, se deberá proyectar una capa de transición y
una capa subrasante de 0.20 m. y 0.30 m. de espesor respectivamente, compactándolas al 95% y
100%; ambas capas se construirán con material procedente del banco de préstamo más cercano.
4.6. BANCOS DE MATERIALES
Conforme a los requerimientos del proyecto geométrico y de terracerías del todo el tramo en
estudio es indispensable emplear material producto de banco para la formación de las capas de
Terraplén, subbalasto, balasto así como el pedraplén y la capa de transición para zonas inundables,
por lo cual se realizó el análisis geológico de la zona, la búsqueda de bancos de materiales activos
además de contar con la relación que el catastro de bancos reporta en la región editada por la
Dirección General de Servicios Técnicos (DGST) de la SCT, con estos datos se procedió a ubicar los
sitios preestablecidos y/o propuestos según sea el caso, zonificando los lugares potencialmente
adecuados en cuanto a tipo de material y cercanía se refiere para su utilización como banco, en
todos los casos se procedió a realizar su exploración y muestreo respectivo con el objeto de analizar
sus propiedades mecánicas y delimitar la zona de explotación, determinando con esto su capacidad
o volumen de explotación.
Se han estudiado los bancos que se muestran en la Tabla 7.
62
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 7 BANCOS DE PRÉSTAMO PARA EL TRAMO 3
CLASIFICACIÓN
COEF. DE VARIACIÓN VOLUMEN
PARA DESPALME TRATAMIENTO
No. DENOMINACIÓN LOCALIZACIÓN ESTRATO PRESUPUESTO VOLUMÉTRICA UTILIZACIÓN APROVECHABLE
(cm) PROBABLE
m³
A B C 90% 95% 100% BANDEADO
Carretera
Campeche – Mérida
TERRAPLÉN
Km 142+750 Lado
SUBRASANTE
Izquierdo. A 750 m TRITURADO Y
001 PROSER N.A. 05 80 15 N.A. 0.68 0.71 0.75 SUB 103,722
delante del Km COMPACTADO
BALASTO
142+000 de la
carretera Campeche
– Mérida
Carretera
Campeche – Mérida
Km. 128+630 lado TERRAPLÉN
Izquierdo a 600 m. SUBRASANTE TRITURADO Y
002 PROSER EJIDAL N.A. 00 60 40 N.A. 0.71 0.75 0.79 286,110
A 630 m delante del SUB COMPACTADO
Km 128+000 de la BALASTO
carretera Campeche
– Mérida
Carretera Izamal –
Valladolid a 10,330
BANCO m del entronque con TERRAPLÉN
TRITURADO Y
003 RANCHO SAN carretera Izamal – N.A. 00 50 50 N.A. 0.70 0.74 0.77 SUBRASANTE 202,764
COMPACTADO
LORENZO Dzilam González
lado derecho a
140m
Carretera Valladolid
– Mérida Km 21+620
Lado derecho a
TERRAPLÉN
3,394 m. A 620 m TRITURADO Y
004 BANCO TICOPÓ N.A. 00 60 40 N.A. 0.69 0.73 0.76 SUBRASANTE 137,141
delante del Km COMPACTADO
21+000 de la
carretera Valladolid
– Mérida.
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
CLASIFICACIÓN
COEF. DE VARIACIÓN VOLUMEN
PARA DESPALME TRATAMIENTO
No. DENOMINACIÓN LOCALIZACIÓN ESTRATO PRESUPUESTO VOLUMÉTRICA UTILIZACIÓN APROVECHABLE
(cm) PROBABLE
m³
A B C 90% 95% 100% BANDEADO
Sobre Calle 5 a 11,
218 metros hacia el TERRAPLÉN
BANCO
Este del entronque SUBRASANTE TRITURADO Y
005 SORIANO DE N.A. 00 60 40 N.A. 0.67 0.71 0.74 190,080
del libramiento SUB COMPACTADO
BECAL 2
Mérida Campeche y BALASTO
Calle 5.
Las ubicaciones de cada uno de estos bancos se muestran en las fichas incluidas en el ANEXO 1: FICHAS DE BANCOS DE MATERIALES.
64
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5. DISEÑO
Para el diseño de los espesores de capas de terracerías y de la estructura ferroviaria se han obtenido
los criterios de diseño que se muestran en la Tabla 8
TABLA 8 CRITERIOS DE DISEÑO
CRITERIO CANTIDAD
Carga máxima por eje del tren de mercancías 32.5 Ton
Carga máxima por eje del tren de pasajeros 19 Ton
Ancho de vía (Escantillón) 1435 mm
Velocidad máxima del tren de mercancías 100 km/h
Velocidad máxima del tren de pasajeros 160 km/h
Longitud de tren de mercancías 500 m
Longitud de tren de pasajeros 200 m
5.1. CLASIFICACIÓN DE LA VÍA A DISEÑAR
Como conclusión de los criterios de diseño y con base en el MANUAL DE CALIDAD PARA MATERIALES
EN LA SECCIÓN ESTRUCTURAL DE VÍAS FERRAS, de la SCT y el IMT, se ha establecido al tramo 3 como
una Vía Férrea Tipo I la cual tiene como característica lo siguiente:
Vías Férreas Tipo I: Son las vías férreas que soportarán el paso de cargas superiores a los 30 millones
de toneladas netas/año. Serán incluidas aquí las vías electrificadas.
Las capas que conformarán la vía y terracerías, son las siguientes:
Balasto,
Sub‐balasto,
Subrasante o capa de forma,
Terraplén,
En caso de zonas inundables se deberá considerar en lugar de Terraplén:
Capa de Transición
Pedraplén
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5.2. ESPESOR DE TERRAPLÉN
El espesor de la capa de terraplén, así como la capa de subrasante estarán condicionados por la
rasante definitiva del Proyecto Ejecutivo. Cabe mencionar que esta rasante estará, a su vez,
condicionada por dos factores principales:
1. Cota de Inundabilidad
2. Obras de drenaje transversal
Para mayor información del proyecto de rasante se podrá consultar el documento TMPE‐3‐VA‐TRA‐
INF‐0016
5.3. ESPESOR DE BALASTO Y SUB‐BALASTO
5.3.1. Método de cálculo
Para dicha justificación se han seguido las indicaciones del “Manual de calidad para materiales en la
sección estructural de vías férreas” del SCT Mexicano, la normativa AREMA Manual for Railway
Engineering. Ed 2019 y las recomendaciones del de la ficha UIC 719 R – “Obras de tierra y capas de
asiento ferroviarias”. Los cálculos se han completado con la aplicación de un modelo avanzado de
elementos finitos (MEF), tridimensional no lineal, utilizado tanto para el cálculo de esfuerzos en las
distintas capas de la plataforma como para el de la rigidez global de vía.
Estos cálculos se encuentran definidos en el Anexo 1, 2 y 3 del informe TMPE‐3‐VA‐VIA‐INF‐0001
referente a la Plataforma y superestructura.
5.3.2. Conclusiones
Derivado del análisis realizado se ha encontrado que es posible optimizar la capa de balasto a 27 cm
teniendo en consecuencia 33 cm de sub balasto, sin embargo, este análisis aún no ha sido aprobado
por lo que se concluye que un espesor de balasto y sub‐balasto de 30cm y 30cm respectivamente
es más que suficiente para cumplir con las cargas y condiciones estipuladas.
5.4. CARACTERÍSTICAS DE MATERIALES
5.4.1. Balasto
El balasto puede definirse, según la norma mexicana PROY‐NOM‐003‐ARTF‐2018 como el material
pétreo seleccionado, producto de la trituración de piedra, que se coloca sobre el sub‐balasto, debajo
de los durmientes y entre ellos, cuya función es soportar las cargas rodantes y transmitirlas a
la terracería, distribuyéndolas en las formas que no se produzcan deformaciones perjudiciales en
éstas.
66
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Trasmita y distribuya la carga de la vía y el equipo rodante ferroviario al sub‐balasto;
Restrinja la vía lateral, longitudinal y verticalmente bajo las cargas dinámicas impuestas por
el equipo rodante ferroviario y los esfuerzos térmicos ejercidos por los rieles;
Proporcione un drenaje adecuado para la vía, y
Mantenga en forma apropiada el nivel normal de la vía, el alineamiento y la nivelación.
Reparta la presión bajo el durmiente para impedir que el subsuelo blando se dañe con el
peso de los trenes (deformando con ello el trazado de la vía).
Ofrezca una superficie sólida, pero con una cierta elasticidad que permite absorber las
vibraciones.
Cabe mencionar que queda excluida de estas especificaciones las vías que estén soportadas
estructuralmente de otra forma (Losas de concreto, bloques plinto, etc.).
La norma mexicana PROY‐NOM‐003‐ARTF‐2018 establece los siguientes valores recomendados para
las pruebas del balasto mismo que aparecen en la Tabla 9.
TABLA 9 VALORES RECOMENDADOS PARA PRUEBAS DE BALASTO. PROY‐NOM‐003‐ARTF‐2018 Y AREMA 2020
MATERIALES QUE PUEDEN UTILIZARSE COMO BALASTO
ESCORIA
ROPIEDADES ESCORIA DE
DE PRUEBA
GRANITO BASALTO CUARCITA CALIZA DOLOMITA HORNOS DE
ALTO A.S.T.M.
ACERACIÓN
HORNO
Porcentaje de
material que pasa por 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% C‐117
la malla No. 200
Volumen
específico gravitacional 2.6 2.6 2.6 2.6 2.65 2.3 2.9 C‐127
(ver nota 2)
Porcentaje de
1 1 1 2 2 5 2 C‐127
absorción
Degradación (LAA) VER
35% 25% 30% 30% 30% 40% 30%
NOTA 1
67
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
MATERIALES QUE PUEDEN UTILIZARSE COMO BALASTO
ESCORIA
ROPIEDADES ESCORIA DE
DE PRUEBA
GRANITO BASALTO CUARCITA CALIZA DOLOMITA HORNOS DE
ALTO A.S.T.M.
ACERACIÓN
HORNO
Intemperismo
acelerado (Sulfato de 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% C‐88
Sodio en 5 ciclos )
Nota 1: Los materiales que al cribarse contienen partículas retenidas en la malla de 1" serán analizados con el método
de prueba A.S.T.M. C‐535. Los materiales que al cribarse pase el 100% a través de la malla de 1" serán analizados con el
método de prueba A.S.T.M. C‐131
Nota 2: Solamente el volumen específico gravitacional el valor límite se tomará el mínimo y los límites para las demás
pruebas se tomarán los valores máximos.
Además, el MANUAL DE CALIDAD PARA MATERIALES EN LA SECCIÓN ESTRUCTURAL DE VÍAS FERRAS,
de la SCT y el IMT, recomienda los valores que aparecen en la Tabla 10 para materiales de balasto.
TABLA 10 VALORES PROPUESTOS PARA MATERIAL DEL BALASTO. MANUAL DE CALIDAD PARA MATERIALES
CALIDAD
CARACTERÍSTICAS
DESEABLE ADECUADA
Granulometría: Zona Granulometría Zonas 1 y 2 (ver Granulometría Zonas 1 y 2 (ver
Granulométrica Figura 3) Figura 3)
Finos (%) (Mat. < 0.074 mm) 0 5 max (2)
Peso Volumétrico seco máximo
1800 min 1800 min
(kg/m3)
68
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
CALIDAD
CARACTERÍSTICAS
DESEABLE ADECUADA
(2) Con Límite Líquido de 25% máximo
Figura 3 Granulometría balasto. Manual de calidad para materiales
5.4.1.1. Granulometría
La granulometría recomendada por la AREMA 2020 se presenta en la Tabla 11.
TABLA 11 GRADUACIÓN DE BALASTO RECOMENDADA. AREMA 2020
No, DEL TAMAÑO
PORCENTAJE QUE PASA
TAMAÑO NOMINAL DE
(NOTA1) ABERTURA 3” 2½” 2” 1½” 1” ¾” ½” 3/8” No. 4 No. 8
24 2½”‐3/4” 100 90‐100 ‐ 25‐60 ‐ 0‐10 0‐5 ‐ ‐ ‐
25 2½”‐3/8” 100 80‐100 60‐85 50‐70 25‐50 ‐ 5‐20 0‐10 0‐3 ‐
3 2”‐1” ‐ 100 95‐100 35‐70 0‐15 ‐ 0‐5 ‐ ‐ ‐
4A 2”‐ ¾” ‐ 100 90‐100 60‐90 10‐35 0‐10 ‐ 0‐3 ‐ ‐
4 1½”‐¾” ‐ ‐ 100 90‐100 20‐55 0‐15 ‐ 0‐5 ‐ ‐
5 1”‐3/8” ‐ ‐ ‐ 100 90‐100 40‐75 15‐35 0‐15 0‐5 ‐
57 1”‐No 4 ‐ ‐ ‐ 100 95‐100 ‐ 25‐60 ‐ 0‐10 0‐5
69
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
No, DEL TAMAÑO
PORCENTAJE QUE PASA
TAMAÑO NOMINAL DE
(NOTA1) ABERTURA 3” 2½” 2” 1½” 1” ¾” ½” 3/8” No. 4 No. 8
NOTA 1: LAS GRADUACIONES DEL NUMERO 24, 25, 3, 4A Y 4 SON PARA LINEAS PRINCIPALES. LAS GRADUACIONES DEL NUMERO 5 Y 57 SON PARA PATIOS,
AMBAS CONSTRUIDAS CON BALASTO.
5.4.1.2. Material
El material a utilizar para el balasto será proveniente de Roca Ígnea tal como lo establecen los
términos de referencia y las especificaciones técnicas de FONATUR.
5.4.1.3. Forma de la particular
Deberá contener como mínimo el 60% en peso de partículas angulosas o trituradas dentro del
material aprovechable y cuando menos el 75% de las partículas en peso; deberá tener dos o más
caras formadas por la fractura de piedra. El Balasto no deberá contener más del 30% en peso
constituido por partículas planas.
5.4.2. Sub‐balasto
El sub‐balasto puede definirse, según la norma mexicana PROY‐NOM‐003‐ARTF‐2018 como la capa
de material graduado que se coloca sobre la superficie terminada de la rasante del terraplén
y debajo del balasto para proporcionar mejor drenaje y distribución de la carga al lecho de la vía.
Las propiedades del subbalasto, así como los métodos de prueba establecidas por la AREMA son
variables dependiendo las características físicas y químicas del balasto y la subrasante. Sin embargo,
estos valores pueden ser definidos por las dependencias ferroviarias de cada sitio. Para este caso se
han tomado los valores límites establecidos en el MANUAL DE CALIDAD PARA MATERIALES EN LA
SECCIÓN ESTRUCTURAL DE VÍAS FERRAS, de la SCT y el IMT así como de la Especificación Técnica
para el suministro de Subbalasto compartida por FONATUR.
Las características recomendadas por el MANUAL DE CALIDAD PARA MATERIALES EN LA SECCIÓN
ESTRUCTURAL DE VÍAS FERRAS, de la SCT y el IMT para el sub‐balasto aparecen en la Tabla 12.
TABLA 12 CARACTERÍSTICAS DEL MATERIAL A USAR EN LA CAPA DE SUB‐BALASTO. MANUAL DE CALIDAD DE LOS
MATERIALES
CALIDAD
CARACTERÍSTICAS
DESEABLE ADECUADA
Granulometría: Zona Granulométrica 1 y 2 (ver Figura 4) 1 y 2 (ver Figura 4)
70
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
CALIDAD
CARACTERÍSTICAS
DESEABLE ADECUADA
Índice Plástico (IP % ) 6 max 10 max
FIGURA 4CURVAS GRANULOMÉTRICAS PARA SUB‐BALASTO. MANUAL DE CALIDAD PARA MATERIALES.
Para las Vías Férreas Tipo I se recomienda cumplir con una calidad DESEABLE en el material que se
ocupará para Sub‐balasto.
71
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Las características recomendadas por Especificación Técnica para el suministro de Subbalasto
compartida por FONATUR para el sub‐balasto aparecen en la Tabla 13.
TABLA 13 CARACTERÍSTICAS DEL MATERIAL A USAR EN LA CAPA DE SUB‐BALASTO. ESPECIFICACIÓN TÉCNICA FONATUR
CALIDAD
CARACTERÍSTICAS
DESEADA
Tamaño máximo (mm) 31.5
Finos (%) (Mat. < 0.074 mm) 3‐5
Equivalente de Arena 45 min
Coeficiente de desgaste de Los Ángeles (CLA) (%) 28 max
Coeficiente de Micro‐Deval Húmeda (MDH) (%) 22 max
Coeficiente de permeabilidad vertical (K) 10‐6 m/s max
Peso Volumétrico seco máximo (kg/m3)
5.4.3. Subrasante
Generalmente es el terreno natural en la cual se apoya toda la estructura del ferrocarril, es decir
que no forma parte de la estructura en sí.
Las características de la subrasante se muestran en la Tabla 14 Características del material a usar en
la capa de subrasante. Manual de CAlidad de los materiales Tabla 14.
TABLA 14 CARACTERÍSTICAS DEL MATERIAL A USAR EN LA CAPA DE SUBRASANTE. MANUAL DE CALIDAD DE LOS
MATERIALES
CALIDAD
CARACTERÍSTICAS
DESEABLE ADECUADA TOLERABLE
Granulometría: Tamaño Máximo 76 76 76
72
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
CALIDAD
CARACTERÍSTICAS
DESEABLE ADECUADA TOLERABLE
Peso Volumétrico seco máximo (kg/m3) 1600 min 1600 min
5.4.4. Terraplenes
Las características de los terraplenes de la plataforma ferroviaria se muestran en la Tabla 15.
TABLA 15 CARACTERÍSTICA DE LOS TERRAPLENES. MANUAL DE CALIDAD DE LOS MATERIALES.
CALIDAD
CARACTERÍSTICAS
DESEABLE ADECUADA TOLERABLE
80% min <76 y 95%
Granulometría (1) (mm) 80% min <750 ‐‐‐‐‐‐
min <200
1000 o ½ espesor del 1500 o ½ espesor del
Tamaño Máximo (mm)
cuerpo cuerpo
Finos (%) (Mat. < 0.074
30 max 40 max 40 max
mm)
En el ANEXO 2: RESUMEN DE ANÁLSIS DE LOS MATERIALES se presenta el listado de los bancos de
materiales estudiados y clasificados para cada tipo de material.
5.4.5. Terraplenes en zonas encharcables
Las características de los terraplenes de la plataforma ferroviaria se muestran en la tabla siguiente:
73
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 16 CARACTERÍSTICA DE LOS TERRAPLENES EN ZONAS ENCHARCABLES. MANUAL DE CALIDAD DE LOS MATERIALES Y
ADIF.
LIMITACIÓN PARA Z.
APTO CORONACIÓN ADIF DESEABLE SCT
ENCHARCABLE
FINOS % 40 MAX (60UNE = 60MM) 30 MAX (<0.074) 15 MAX
Por lo tanto, para estas zonas se propone un material que cumpla con las características destacadas
en la tabla anterior, en un espesor hasta 50 cm por encima de la cota de encharcamiento
determinada. Además, entre esta capa y la subrasante se ha de introducir una capa de transición de
50 cm con especificaciones técnicas similares a la de la capa de relleno, capa denominada “capa
subyacente”.
5.5. CORTES
En todo el tramo se presentan escasas zonas de corte, en comparación a las zonas de terraplén.
Estas zonas estarán definidas en los planos de planta y perfil. A continuación, se presentan las tablas
por subtramos con los cadenamientos en los cuales, según la topografía, el trazo y secciones
proyectadas se requiere cortar el terreno natural.
TABLA 17 VOLUMEN DE CORTE PARA EL TRAMO DEL [ADMINISTRADOR]
74
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
75
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
76
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
77
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
78
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
79
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
80
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
81
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
82
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
83
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
84
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
85
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
86
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
87
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
88
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
89
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
90
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
91
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
92
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
93
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
94
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
95
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
96
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
97
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
98
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
99
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
100
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
101
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
102
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
103
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
104
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
105
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
106
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
107
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
108
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
109
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
110
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
111
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
112
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
113
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
114
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
115
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
116
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
117
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
118
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
119
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
120
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 18 VOLUMEN DE CORTE PARA EL TRAMO DEL 5071+500 – 6006+000
121
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
122
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
123
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
124
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
125
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
126
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
127
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
128
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
129
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
130
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 19 VOLUMEN DE CORTE PARA EL TRAMO DEL 6017+000 AL 6030+000
131
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
132
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
133
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
134
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
135
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
136
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
137
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
138
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
139
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
140
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
141
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
142
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
143
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
144
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
145
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
146
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 20 VOLUMEN DE CORTE PARA EL TRAMO DEL 6036+800– 6067+000
147
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
148
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
149
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
150
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
151
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
152
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
153
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
154
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
155
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
156
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
157
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
158
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
159
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
160
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
161
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
162
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
163
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
164
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
165
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
166
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
167
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
168
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
169
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
170
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
171
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
172
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
173
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
174
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
175
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
176
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
177
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
178
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
179
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5.5.1. Cortes en zonas de la vía del FIT
En las zonas en donde el trazado de la vía proyectada coincida con la antigua línea del FIT, como se
muestra en la Figura 5 se tiene previsto la excavación y remoción de la plataforma ferroviaria
existente, para lo cual se sustituirá ese material excavado con material competente de relleno que
cumpla con la normativa SCT.
FIGURA 5 SECCIÓN TRANSVERSAL DE ZONAS DONDE INTERACTÚA LA LÍNEA DEL FIT CON EL TRAZADO DEL TRAMO 3
Para el material de relleno se tiene previsto realizar tratamiento necesario del volumen excavado
de la plataforma existente del FIT para cumplir con la calidad establecida por la normativa SCT. De
no ser posible utilizar el material retirado se utilizará material de relleno producto de los bancos de
préstamos autorizados.
5.6. REVEGETACIÓN DE TALUDES
A lo largo del trazado ferroviario se reutilizará la tierra vegetal producto de despalme para el
extendido y compactado de los taludes de terraplén en aquellas zonas no propensas a inundaciones
tal como se muestra en la Figura 6. Esto con la finalidad de proteger contra el intemperismo y
degradación a las capas de material que conforman el terraplén y dotarlo de cierta estabilidad
adicional.
180
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
FIGURA 6 PROPUESTA DE REVEGETACIÓN DE TALUDES
El material restante del despalme se reutilizará para el relleno del camino de servicio, aplicándole
un tratamiento de 1% de cal para mejorar las propiedades del terreno y con una pendiente del 3%
para que desagüe en dirección opuesta a la plataforma del tren.
Una vez realizados la revegetación de taludes y el camino de servicio, el material restante del
despalme se utilizará para revegetar el pie de terraplén opuesto al lado del camino de servicio,
aplicando la misma pendiente del 3% con el objetivo de que sirva para evitar acumulaciones de agua
en el pie del terraplén.
5.7. ZONAS ENCHARCABLES
Tras haber realizado los análisis hidráulicos correspondientes, determinamos que en el Tramo 3 del
Tren Maya no existen zonas inundables. Sí existen sin embargo zonas de acumulación de agua, en
las que debido a las características topográficas de la zona se pudiera presentar una lámina de agua
en eventos de lluvia.
En estas zonas, y siguiendo normativas internacionales (ADIF: Pliego General de Prescripciones
Técnicas Tipo para los proyectos de plataforma) se busca evitar el ascenso de agua por capilaridad
desde la cimentación del terraplén hasta las capas superiores de la plataforma, para ello, y siguiendo
estas normativas, se propone lo siguiente, citado textualmente:
Una capa de hasta 2 m de espesor formada por materiales que cumplan las
prescripciones de los materiales a utilizar en coronación con la condición adicional de
tener un contenido de finos (materiales pasantes por el tamiz 0,080 UNE) inferior al 15%.
De acuerdo con estos criterios, tendríamos la siguiente sección tipo.
181
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
FIGURA 7 SECCIÓN TIPO DE TERRAPLÉN EN ZONAS ENCHARCABLES
En consecuencia, en las zonas encharcables, la cota roja ha de ser 2.438 metros superior a la cota
de referencia.
5.8. TERRENO NATURAL
5.8.1. Desmonte
El desmonte es la acción de remover toda la vegetación existente dentro del derecho de vía o la
zona de actuación de un proyecto de obra civil. En algunos casos el desmonte incluye la replantación
de algunas especies de árboles y arbustos. El desmonte incluye desde la tala de árboles y arbustos
hasta el corte de maleza, siembra, zacate, etc.
5.8.2. Despalme
El despalme es la acción de remover o quitar la tierra vegetal y el material superficial del terreno. El
espesor del despalme estará definido por el estudio geotécnico en campo realizado, pudiendo ser
este variable a lo largo de los tramos.
Para los tramos se presentan las siguientes tablas donde se definen los espesores de despalme.
TABLA 21 ESPESOR DE DESPALME DEL [ADMINISTRADOR]
Cadenamiento Espesor
despalme
Inicial Final
(m)
4119+000 4119+450 0.99
182
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Espesor
despalme
Inicial Final
(m)
4119+450 4119+880 0.0
4119+880 4120+400 0.30
4120+400 4120+900 0.70
4120+900 4121+400 0.10
4121+400 5000+000 0
5000+000 5000+510 0.20
5000+510 5001+390 0.30
183
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Espesor
despalme
Inicial Final
(m)
184
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Espesor
despalme
Inicial Final
(m)
5031+882 5032+200 0.20
5032+200 5032+600 0.30
TABLA 22 ESPESOR DE DESPALME DEL 5071+500 – 6006+000
Cadenamiento Espesor
despalme
Inicial Final (m)
5070+100 5070+517 0.15
5070+517 5070+600 0.1
5070+600 5071+100 0.2
5071+100 5071+480 0.1
5071+480 5072+100 0.15
5072+100 5072+600 0
5072+600 5072+700 0.8
5072+700 6000+300 0.3
185
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Espesor
despalme
Inicial Final (m)
6000+300 6000+600 0.4
6000+600 6000+800 0.2
TABLA 23 ESPESOR DE DESPALME DEL TRAMO 6017+000 AL 6030+000
Cadenamiento Espesor
Inicial Final despalme
6018+000 6018+100 0.48
186
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Espesor
Inicial Final despalme
187
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 24 ESPESOR DE DESPALME DEL TRAMO 6036+800– 6067+000
Cadenamiento Espesor
despalme
Inicial Final (m)
6037+000 6037+185 0.70
6037+185 6037+680 0.60
6037+680 6038+180 0.50
6038+180 6038+685 0
6038+685 6038+935 0.37
6038+935 6039+495 0.30
6039+495 6039+970 0.70
188
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Espesor
despalme
Inicial Final (m)
6049+730 6050+240 0.30
189
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
Cadenamiento Espesor
despalme
Inicial Final (m)
6065+625 6066+100 0.4
6066+100 6066+585 0.51
6066+585 6067+595 0.05
6. CURVA MASA, ACARREOS Y DESPERDICIOS
6.1. CÁLCULOS DE PRÉSTAMOS Y DESPERDICIOS
Una vez desarrollado el proyecto de plata, perfil y secciones transversales del tramo se procede a
calcular los volúmenes de corte y terraplén requeridos
La ordenada de la curva masa en una estación, como lo establece Manual de Proyecto Geométrico
de Carreteras 2018, determinada es la suma algebraica de los volúmenes de terraplén y de corte;
estos últimos afectados por su coeficiente de variabilidad volumétrica, considerados los volúmenes
desde un origen hasta esa estación; se establece que los volúmenes de corte son positivos y los de
terraplén son negativos. Estas ordenadas sirven para dibujar el diagrama de masas en un sistema
de coordenadas rectangulares. La Figura 8 muestra un ejemplo de la gráfica de Ordenada Curva
Masa donde se procede a trazar una línea compensadora para la obtención del balance de
préstamos y compensaciones.
190
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
FIGURA 8 EJEMPLO DE GRÁFICA DE ORDENADA CURVA MASA. MANUAL DE PROYECTO GEOMÉTRICO DE CARRETERAS
2018
Basándose en la información geotécnica se estableció que todo el material producto de corte no
sería aprovechable para compensar los rellenos y formaciones de terraplén por lo que la no existe
la necesidad de una línea compensadora. En conclusión, los diagramas obtenidos serán únicamente
diagramas de acarreos y desperdicios.
6.1.1. Cálculo de acarreos para terraplén
A continuación, se presenta las siguientes tablas por subtramo con los cálculos de la curva masa
para las terracerías.
TABLA 25 CÁLCULO DE CURVA MASA DEL TRAMO DEL [ADMINISTRADOR]
191
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5000+160.00 0.00 22.48 0.00 48.03 10.00 0.00 0.00 480.27 1,296,199.32
5000+180.00 0.00 27.87 0.00 50.35 10.00 0.00 0.00 503.45 1,295,695.87
5000+200.00 0.00 30.16 0.00 58.02 10.00 0.00 0.00 580.24 1,295,115.63
5000+220.00 0.00 31.51 0.00 61.66 10.00 0.00 0.00 616.63 1,294,499.00
5000+240.00 0.00 33.58 0.00 65.08 10.00 0.00 0.00 650.82 1,293,848.18
5000+260.00 0.00 40.93 0.00 74.51 10.00 0.00 0.00 745.08 1,293,103.10
5000+280.00 0.00 46.73 0.00 87.66 10.00 0.00 0.00 876.64 1,292,226.46
5000+300.00 0.00 33.53 0.00 80.26 10.00 0.00 0.00 802.62 1,291,423.84
5000+320.00 0.00 28.24 0.00 61.77 10.00 0.00 0.00 617.66 1,290,806.18
5000+340.00 0.00 30.39 0.00 58.63 10.00 0.00 0.00 586.29 1,290,219.89
5000+360.00 0.00 31.30 0.00 61.69 10.00 0.00 0.00 616.89 1,289,603.00
5000+380.00 0.00 26.72 0.00 58.02 10.00 0.00 0.00 580.15 1,289,022.85
5000+400.00 0.00 17.02 0.00 43.74 10.00 0.00 0.00 437.39 1,288,585.46
5000+420.00 0.00 25.41 0.00 42.43 10.00 0.00 0.00 424.32 1,288,161.14
5000+440.00 0.00 32.43 0.00 57.84 10.00 0.00 0.00 578.44 1,287,582.70
5000+440.00 0.00 31.27 0.00 63.70 0.00 0.00 0.00 0.00 1,287,582.70
5000+460.00 0.00 15.14 0.00 46.41 10.00 0.00 0.00 464.05 1,287,118.65
5000+480.00 0.00 18.85 0.00 33.99 10.00 0.00 0.00 339.90 1,286,778.75
5000+500.00 0.00 18.44 0.00 37.29 10.00 0.00 0.00 372.87 1,286,405.88
5000+520.00 0.00 24.90 0.00 43.34 10.00 0.00 0.00 433.38 1,285,972.50
5000+540.00 0.00 10.76 0.00 35.66 10.00 0.00 0.00 356.58 1,285,615.92
5000+560.00 0.00 13.12 0.00 23.88 10.00 0.00 0.00 238.76 1,285,377.16
5000+580.00 0.71 3.31 0.71 16.43 10.00 7.06 9.18 164.31 1,285,222.03
5000+600.00 0.00 12.83 0.71 16.14 10.00 7.06 9.18 161.43 1,285,069.78
5000+620.00 0.00 13.23 0.00 26.06 10.00 0.00 0.00 260.58 1,284,809.20
5000+640.00 0.00 13.26 0.00 26.49 10.00 0.00 0.00 264.91 1,284,544.29
5000+660.00 0.00 22.85 0.00 36.12 10.00 0.00 0.00 361.16 1,284,183.13
5000+680.00 0.00 28.52 0.00 51.37 10.00 0.00 0.00 513.72 1,283,669.41
5000+700.00 0.00 32.04 0.00 60.56 10.00 0.00 0.00 605.62 1,283,063.79
5000+720.00 0.00 35.28 0.00 67.32 10.00 0.00 0.00 673.24 1,282,390.55
5000+740.00 0.00 39.89 0.00 75.17 10.00 0.00 0.00 751.68 1,281,638.87
5000+760.00 0.00 44.22 0.00 84.11 10.00 0.00 0.00 841.09 1,280,797.78
5000+780.00 0.00 45.51 0.00 89.74 10.00 0.00 0.00 897.36 1,279,900.42
5000+800.00 0.00 43.21 0.00 88.72 10.00 0.00 0.00 887.23 1,279,013.19
5000+820.00 0.00 38.63 0.00 81.84 10.00 0.00 0.00 818.39 1,278,194.80
5000+840.00 0.00 30.27 0.00 68.90 10.00 0.00 0.00 688.98 1,277,505.82
5000+860.00 0.00 40.67 0.00 70.94 10.00 0.00 0.00 709.43 1,276,796.39
5000+880.00 0.00 23.80 0.00 64.47 10.00 0.00 0.00 644.71 1,276,151.68
5000+900.00 0.00 7.96 0.00 31.75 10.00 0.00 0.00 317.54 1,275,834.14
5000+920.00 0.00 13.60 0.00 21.55 10.00 0.00 0.00 215.52 1,275,618.62
5000+940.00 0.00 11.90 0.00 25.50 10.00 0.00 0.00 254.98 1,275,363.64
5000+960.00 0.00 18.37 0.00 30.27 10.00 0.00 0.00 302.73 1,275,060.91
5000+960.00 0.00 16.30 0.00 34.67 0.00 0.00 0.00 0.00 1,275,060.91
5000+980.00 0.00 6.68 0.00 22.98 10.00 0.00 0.00 229.79 1,274,831.12
5001+000.00 0.00 5.85 0.00 12.52 10.00 0.00 0.00 125.22 1,274,705.90
192
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5001+020.00 0.00 9.69 0.00 15.54 10.00 0.00 0.00 155.39 1,274,550.51
5001+040.00 0.00 12.96 0.00 22.65 10.00 0.00 0.00 226.49 1,274,324.02
5001+060.00 0.00 13.19 0.00 26.14 10.00 0.00 0.00 261.43 1,274,062.59
5001+080.00 0.00 15.69 0.00 28.88 10.00 0.00 0.00 288.75 1,273,773.84
5001+100.00 0.00 13.84 0.00 29.53 10.00 0.00 0.00 295.31 1,273,478.53
5001+120.00 0.00 25.68 0.00 39.53 10.00 0.00 0.00 395.26 1,273,083.27
5001+140.00 0.00 26.31 0.00 51.99 10.00 0.00 0.00 519.93 1,272,563.34
5001+160.00 0.00 23.54 0.00 49.85 10.00 0.00 0.00 498.53 1,272,064.81
5001+180.00 0.00 13.94 0.00 37.48 10.00 0.00 0.00 374.84 1,271,689.97
5001+200.00 0.00 8.16 0.00 22.11 10.00 0.00 0.00 221.05 1,271,468.92
5001+220.00 0.00 26.63 0.00 34.79 10.00 0.00 0.00 347.93 1,271,120.99
5001+240.00 0.00 27.75 0.00 54.38 10.00 0.00 0.00 543.77 1,270,577.22
5001+260.00 0.00 16.10 0.00 43.84 10.00 0.00 0.00 438.44 1,270,138.78
5001+280.00 0.00 8.60 0.00 24.70 10.00 0.00 0.00 246.99 1,269,891.79
5001+300.00 0.00 5.08 0.00 13.68 10.00 0.00 0.00 136.84 1,269,754.95
5001+320.00 0.00 13.29 0.00 18.37 10.00 0.00 0.00 183.71 1,269,571.24
5001+340.00 0.00 13.03 0.00 26.32 10.00 0.00 0.00 263.15 1,269,308.09
5001+360.00 0.00 18.80 0.00 31.83 10.00 0.00 0.00 318.25 1,268,989.84
5001+380.00 0.00 17.32 0.00 36.12 10.00 0.00 0.00 361.23 1,268,628.61
5001+400.00 0.00 16.43 0.00 33.76 10.00 0.00 0.00 337.58 1,268,291.03
5001+420.00 0.00 13.82 0.00 30.25 10.00 0.00 0.00 302.50 1,267,988.53
5001+440.00 0.00 15.06 0.00 28.88 10.00 0.00 0.00 288.75 1,267,699.78
5001+460.00 0.00 13.28 0.00 28.34 10.00 0.00 0.00 283.35 1,267,416.43
5001+480.00 0.00 10.87 0.00 24.15 10.00 0.00 0.00 241.50 1,267,174.93
5001+500.00 0.00 10.30 0.00 21.17 10.00 0.00 0.00 211.74 1,266,963.19
5001+520.00 1.45 4.44 1.45 14.74 10.00 14.48 18.82 147.35 1,266,834.66
5001+540.00 0.00 4.69 1.45 9.12 10.00 14.48 18.82 91.23 1,266,762.25
5001+560.00 0.98 3.79 0.98 8.47 10.00 9.81 12.75 84.74 1,266,690.27
5001+580.00 1.09 0.92 2.07 4.71 10.00 20.74 26.96 47.07 1,266,670.16
5001+600.00 0.00 6.04 1.09 6.96 10.00 10.93 14.21 69.59 1,266,614.78
5001+620.00 0.00 10.48 0.00 16.52 10.00 0.00 0.00 165.20 1,266,449.58
5001+640.00 0.00 10.92 0.00 21.40 10.00 0.00 0.00 214.04 1,266,235.54
5001+660.00 0.00 12.85 0.00 23.77 10.00 0.00 0.00 237.74 1,265,997.80
5001+680.00 0.00 12.91 0.00 25.76 10.00 0.00 0.00 257.63 1,265,740.17
5001+700.00 0.00 12.75 0.00 25.66 10.00 0.00 0.00 256.61 1,265,483.56
5001+720.00 0.00 6.98 0.00 19.73 10.00 0.00 0.00 197.28 1,265,286.28
5001+740.00 0.00 8.20 0.00 15.18 10.00 0.00 0.00 151.78 1,265,134.50
5001+760.00 3.14 6.06 3.14 14.26 10.00 31.36 40.77 142.61 1,265,032.66
5001+780.00 0.00 3.19 3.14 9.25 10.00 31.36 40.77 92.52 1,264,980.90
5001+800.00 0.00 9.85 0.00 13.04 10.00 0.00 0.00 130.38 1,264,850.52
5001+820.00 0.00 12.00 0.00 21.85 10.00 0.00 0.00 218.47 1,264,632.05
5001+840.00 0.00 11.22 0.00 23.22 10.00 0.00 0.00 232.19 1,264,399.86
5001+860.00 0.00 9.21 0.00 20.43 10.00 0.00 0.00 204.28 1,264,195.58
5001+880.00 5.69 1.35 5.69 10.56 10.00 56.89 73.96 105.55 1,264,163.99
5001+900.00 2.35 3.77 8.04 5.12 10.00 80.36 104.47 51.18 1,264,217.28
193
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5001+920.00 0.00 9.04 2.35 12.81 10.00 23.47 30.51 128.08 1,264,119.71
5001+940.00 0.88 3.60 0.88 12.63 10.00 8.81 11.45 126.34 1,264,004.82
5001+960.00 0.82 3.59 1.70 7.19 10.00 16.98 22.07 71.89 1,263,955.01
5001+980.00 0.00 8.08 0.82 11.67 10.00 8.17 10.62 116.69 1,263,848.94
5002+000.00 0.00 5.88 0.00 13.96 10.00 0.00 0.00 139.55 1,263,709.39
5002+020.00 0.00 7.76 0.00 13.64 10.00 0.00 0.00 136.38 1,263,573.01
5002+040.00 0.00 6.64 0.00 14.40 10.00 0.00 0.00 143.97 1,263,429.04
5002+060.00 0.00 4.80 0.00 11.43 10.00 0.00 0.00 114.32 1,263,314.72
5002+080.00 0.00 7.87 0.00 12.67 10.00 0.00 0.00 126.69 1,263,188.03
5002+100.00 0.00 12.13 0.00 20.01 10.00 0.00 0.00 200.07 1,262,987.96
5002+120.00 0.00 10.23 0.00 22.37 10.00 0.00 0.00 223.68 1,262,764.28
5002+140.00 0.00 6.10 0.00 16.34 10.00 0.00 0.00 163.35 1,262,600.93
5002+160.00 0.00 10.27 0.00 16.37 10.00 0.00 0.00 163.74 1,262,437.19
5002+180.00 0.00 8.83 0.00 19.11 10.00 0.00 0.00 191.07 1,262,246.12
5002+200.00 0.00 11.08 0.00 19.91 10.00 0.00 0.00 199.10 1,262,047.02
5002+220.00 0.00 8.02 0.00 19.10 10.00 0.00 0.00 191.00 1,261,856.02
5002+240.00 0.91 2.40 0.91 10.43 10.00 9.08 11.80 104.26 1,261,763.56
5002+260.00 0.79 1.87 1.70 4.27 10.00 17.00 22.10 42.67 1,261,742.99
5002+280.00 0.97 1.18 1.76 3.05 10.00 17.63 22.92 30.45 1,261,735.46
5002+300.00 1.26 3.18 2.23 4.36 10.00 22.34 29.04 43.63 1,261,720.87
5002+320.00 0.00 9.64 1.26 12.82 10.00 12.63 16.42 128.18 1,261,609.11
5002+340.00 0.00 12.07 0.00 21.70 10.00 0.00 0.00 217.03 1,261,392.08
5002+360.00 0.00 11.92 0.00 23.98 10.00 0.00 0.00 239.84 1,261,152.24
5002+380.00 0.00 13.28 0.00 25.19 10.00 0.00 0.00 251.93 1,260,900.31
5002+400.00 0.00 14.93 0.00 28.21 10.00 0.00 0.00 282.11 1,260,618.20
5002+420.00 0.00 10.23 0.00 25.17 10.00 0.00 0.00 251.67 1,260,366.53
5002+440.00 0.00 8.58 0.00 18.81 10.00 0.00 0.00 188.09 1,260,178.44
5002+460.00 0.76 2.72 0.76 11.30 10.00 7.60 9.88 113.00 1,260,075.32
5002+480.00 0.68 2.15 1.44 4.87 10.00 14.38 18.69 48.71 1,260,045.31
5002+500.00 0.00 9.57 0.68 11.71 10.00 6.78 8.81 117.13 1,259,936.99
5002+520.00 0.00 12.61 0.00 22.18 10.00 0.00 0.00 221.80 1,259,715.19
5002+540.00 0.00 11.76 0.00 24.37 10.00 0.00 0.00 243.70 1,259,471.49
5002+560.00 0.00 8.33 0.00 20.09 10.00 0.00 0.00 200.90 1,259,270.59
5002+580.00 0.00 7.66 0.00 15.99 10.00 0.00 0.00 159.91 1,259,110.68
5002+600.00 0.00 11.76 0.00 19.42 10.00 0.00 0.00 194.16 1,258,916.52
5002+620.00 0.00 9.96 0.00 21.72 10.00 0.00 0.00 217.16 1,258,699.36
5002+640.00 0.00 4.32 0.00 14.28 10.00 0.00 0.00 142.81 1,258,556.55
5002+660.00 0.00 9.13 0.00 13.46 10.00 0.00 0.00 134.56 1,258,421.99
5002+680.00 0.00 6.25 0.00 15.38 10.00 0.00 0.00 153.81 1,258,268.18
5002+700.00 0.90 2.94 0.90 9.19 10.00 8.99 11.69 91.92 1,258,187.95
5002+720.00 0.00 7.37 0.90 10.31 10.00 8.99 11.69 103.10 1,258,096.53
5002+740.00 0.00 4.05 0.00 11.41 10.00 0.00 0.00 114.13 1,257,982.40
5002+745.00 0.00 4.30 0.00 8.35 2.50 0.00 0.00 20.87 1,257,961.53
5002+745.00 0.00 4.90 0.00 9.20 0.00 0.00 0.00 0.00 1,257,961.53
5002+760.00 0.00 5.65 0.00 10.55 7.50 0.00 0.00 79.11 1,257,882.42
194
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5002+780.00 0.00 5.29 0.00 10.94 10.00 0.00 0.00 109.40 1,257,773.02
5002+800.00 0.00 7.12 0.00 12.41 10.00 0.00 0.00 124.09 1,257,648.93
5002+820.00 0.00 8.76 0.00 15.89 10.00 0.00 0.00 158.85 1,257,490.08
5002+840.00 0.00 8.49 0.00 17.25 10.00 0.00 0.00 172.53 1,257,317.55
5002+860.00 0.00 9.24 0.00 17.73 10.00 0.00 0.00 177.25 1,257,140.30
5002+880.00 0.00 8.88 0.00 18.12 10.00 0.00 0.00 181.19 1,256,959.11
5002+900.00 0.00 12.42 0.00 21.30 10.00 0.00 0.00 213.03 1,256,746.08
5002+920.00 0.00 13.65 0.00 26.07 10.00 0.00 0.00 260.73 1,256,485.35
5002+940.00 0.00 8.30 0.00 21.95 10.00 0.00 0.00 219.53 1,256,265.82
5002+960.00 0.00 11.14 0.00 19.44 10.00 0.00 0.00 194.41 1,256,071.41
5002+980.00 0.00 6.41 0.00 17.55 10.00 0.00 0.00 175.49 1,255,895.92
5003+000.00 0.00 4.57 0.00 10.98 10.00 0.00 0.00 109.76 1,255,786.16
5003+020.00 0.00 3.96 0.00 8.53 10.00 0.00 0.00 85.33 1,255,700.83
5003+040.00 0.00 7.11 0.00 11.08 10.00 0.00 0.00 110.78 1,255,590.05
5003+060.00 0.00 8.88 0.00 15.99 10.00 0.00 0.00 159.91 1,255,430.14
5003+080.00 0.00 8.68 0.00 17.55 10.00 0.00 0.00 175.52 1,255,254.62
5003+100.00 0.00 11.19 0.00 19.86 10.00 0.00 0.00 198.60 1,255,056.02
5003+120.00 0.00 11.25 0.00 22.43 10.00 0.00 0.00 224.33 1,254,831.69
5003+140.00 0.00 11.18 0.00 22.43 10.00 0.00 0.00 224.29 1,254,607.40
5003+160.00 0.00 11.03 0.00 22.21 10.00 0.00 0.00 222.07 1,254,385.33
5003+180.00 0.00 12.19 0.00 23.22 10.00 0.00 0.00 232.19 1,254,153.14
5003+200.00 0.00 13.28 0.00 25.47 10.00 0.00 0.00 254.68 1,253,898.46
5003+220.00 0.00 14.16 0.00 27.44 10.00 0.00 0.00 274.35 1,253,624.11
5003+240.00 0.00 14.36 0.00 28.52 10.00 0.00 0.00 285.17 1,253,338.94
5003+260.00 0.00 13.00 0.00 27.36 10.00 0.00 0.00 273.55 1,253,065.39
5003+280.00 0.00 14.72 0.00 27.72 10.00 0.00 0.00 277.15 1,252,788.24
5003+300.00 0.00 16.78 0.00 31.50 10.00 0.00 0.00 315.01 1,252,473.23
5003+320.00 0.00 21.35 0.00 38.13 10.00 0.00 0.00 381.29 1,252,091.94
5003+340.00 0.00 21.91 0.00 43.26 10.00 0.00 0.00 432.57 1,251,659.37
5003+360.00 0.00 26.21 0.00 48.13 10.00 0.00 0.00 481.26 1,251,178.11
5003+380.00 0.00 27.18 0.00 53.39 10.00 0.00 0.00 533.91 1,250,644.20
5003+400.00 0.00 24.85 0.00 52.03 10.00 0.00 0.00 520.29 1,250,123.91
5003+420.00 0.00 26.16 0.00 51.01 10.00 0.00 0.00 510.12 1,249,613.79
5003+440.00 0.00 34.20 0.00 60.36 10.00 0.00 0.00 603.58 1,249,010.21
5003+460.00 0.00 37.33 0.00 71.53 10.00 0.00 0.00 715.31 1,248,294.90
5003+480.00 0.00 38.94 0.00 76.27 10.00 0.00 0.00 762.74 1,247,532.16
5003+490.00 0.00 38.27 0.00 77.22 5.00 0.00 0.00 386.08 1,247,146.09
5003+490.00 0.00 43.36 0.00 81.63 0.00 0.00 0.00 0.00 1,247,146.09
5003+500.00 0.00 42.51 0.00 85.86 5.00 0.00 0.00 429.30 1,246,716.79
5003+520.00 0.00 45.76 0.00 88.27 10.00 0.00 0.00 882.67 1,245,834.12
5003+540.00 0.00 45.80 0.00 91.56 10.00 0.00 0.00 915.60 1,244,918.52
5003+560.00 0.00 44.53 0.00 90.33 10.00 0.00 0.00 903.25 1,244,015.27
5003+580.00 0.00 35.39 0.00 79.92 10.00 0.00 0.00 799.15 1,243,216.12
5003+600.00 0.00 32.97 0.00 68.35 10.00 0.00 0.00 683.53 1,242,532.59
5003+620.00 0.00 33.65 0.00 66.62 10.00 0.00 0.00 666.17 1,241,866.42
195
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5003+640.00 0.00 28.78 0.00 62.44 10.00 0.00 0.00 624.36 1,241,242.06
5003+660.00 0.00 28.60 0.00 57.39 10.00 0.00 0.00 573.88 1,240,668.18
5003+680.00 0.00 27.06 0.00 55.67 10.00 0.00 0.00 556.67 1,240,111.51
5003+700.00 0.00 28.58 0.00 55.65 10.00 0.00 0.00 556.47 1,239,555.04
5003+720.00 0.00 24.08 0.00 52.67 10.00 0.00 0.00 526.65 1,239,028.39
5003+740.00 0.00 23.29 0.00 47.37 10.00 0.00 0.00 473.71 1,238,554.68
5003+760.00 0.00 21.56 0.00 44.85 10.00 0.00 0.00 448.50 1,238,106.18
5003+780.00 0.00 17.31 0.00 38.87 10.00 0.00 0.00 388.67 1,237,717.51
5003+800.00 0.00 13.32 0.00 30.63 10.00 0.00 0.00 306.28 1,237,411.23
5003+820.00 0.00 13.83 0.00 27.15 10.00 0.00 0.00 271.52 1,237,139.71
5003+840.00 0.00 20.29 0.00 34.12 10.00 0.00 0.00 341.24 1,236,798.47
5003+860.00 0.00 20.95 0.00 41.24 10.00 0.00 0.00 412.41 1,236,386.06
5003+880.00 0.00 18.44 0.00 39.39 10.00 0.00 0.00 393.90 1,235,992.16
5003+900.00 0.00 10.53 0.00 28.97 10.00 0.00 0.00 289.73 1,235,702.43
5003+920.00 0.00 10.89 0.00 21.43 10.00 0.00 0.00 214.25 1,235,488.18
5003+940.00 0.00 13.03 0.00 23.92 10.00 0.00 0.00 239.21 1,235,248.97
5003+960.00 0.00 13.86 0.00 26.89 10.00 0.00 0.00 268.91 1,234,980.06
5003+980.00 0.00 12.64 0.00 26.50 10.00 0.00 0.00 265.01 1,234,715.05
5004+000.00 0.00 10.43 0.00 23.07 10.00 0.00 0.00 230.65 1,234,484.40
5004+020.00 0.00 6.37 0.00 16.79 10.00 0.00 0.00 167.93 1,234,316.47
5004+040.00 0.18 5.84 0.18 12.20 10.00 1.78 2.31 122.03 1,234,196.75
5004+060.00 0.00 8.43 0.18 14.27 10.00 1.78 2.31 142.72 1,234,056.34
5004+080.00 0.39 4.53 0.39 12.96 10.00 3.91 5.08 129.64 1,233,931.79
5004+100.00 0.50 4.77 0.89 9.30 10.00 8.87 11.53 92.97 1,233,850.35
5004+120.00 0.38 5.79 0.88 10.55 10.00 8.75 11.38 105.54 1,233,756.18
5004+140.00 0.77 3.19 1.15 8.97 10.00 11.51 14.96 89.73 1,233,681.42
5004+160.00 0.33 6.18 1.11 9.37 10.00 11.05 14.37 93.68 1,233,602.10
5004+180.00 0.17 6.36 0.50 12.54 10.00 4.98 6.47 125.38 1,233,483.20
5004+200.00 0.00 9.56 0.17 15.92 10.00 1.65 2.15 159.17 1,233,326.17
5004+220.00 0.00 9.81 0.00 19.37 10.00 0.00 0.00 193.67 1,233,132.50
5004+240.00 0.00 9.60 0.00 19.41 10.00 0.00 0.00 194.10 1,232,938.40
5004+260.00 0.00 8.82 0.00 18.42 10.00 0.00 0.00 184.21 1,232,754.19
5004+280.00 0.00 7.82 0.00 16.63 10.00 0.00 0.00 166.32 1,232,587.87
5004+300.00 0.28 7.66 0.28 15.47 10.00 2.80 3.64 154.73 1,232,436.78
5004+310.00 0.25 7.54 0.53 15.20 5.00 2.65 3.45 75.99 1,232,364.24
5004+310.00 0.32 6.92 0.57 14.46 0.00 0.00 0.00 0.00 1,232,364.24
5004+320.00 0.29 6.77 0.61 13.69 5.00 3.06 3.97 68.46 1,232,299.75
5004+340.00 0.45 9.36 0.74 16.13 10.00 7.41 9.63 161.32 1,232,148.07
5004+360.00 0.00 11.02 0.45 20.39 10.00 4.48 5.82 203.86 1,231,950.03
5004+380.00 0.00 6.76 0.00 17.78 10.00 0.00 0.00 177.77 1,231,772.26
5004+400.00 0.25 6.44 0.25 13.20 10.00 2.49 3.24 131.99 1,231,643.51
5004+420.00 0.00 14.26 0.25 20.70 10.00 2.49 3.24 207.02 1,231,439.72
5004+440.00 0.00 11.59 0.00 25.85 10.00 0.00 0.00 258.47 1,231,181.25
5004+460.00 0.15 5.71 0.15 17.29 10.00 1.48 1.92 172.94 1,231,010.24
5004+480.00 0.00 9.87 0.15 15.58 10.00 1.48 1.92 155.75 1,230,856.41
196
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5004+490.00 0.00 9.27 0.00 19.14 5.00 0.00 0.00 95.71 1,230,760.71
5004+490.00 0.00 6.56 0.00 15.83 0.00 0.00 0.00 0.00 1,230,760.71
5004+500.00 0.91 5.88 0.91 12.44 5.00 4.54 5.90 62.19 1,230,704.41
5004+520.00 0.00 7.52 0.91 13.41 10.00 9.07 11.79 134.06 1,230,582.14
5004+540.00 0.00 11.08 0.00 18.60 10.00 0.00 0.00 186.04 1,230,396.10
5004+560.00 0.00 12.03 0.00 23.11 10.00 0.00 0.00 231.11 1,230,164.99
5004+580.00 0.00 12.62 0.00 24.65 10.00 0.00 0.00 246.54 1,229,918.45
5004+600.00 0.00 13.21 0.00 25.83 10.00 0.00 0.00 258.31 1,229,660.14
5004+620.00 0.00 14.09 0.00 27.29 10.00 0.00 0.00 272.93 1,229,387.21
5004+640.00 0.00 12.27 0.00 26.35 10.00 0.00 0.00 263.52 1,229,123.69
5004+660.00 0.00 8.33 0.00 20.60 10.00 0.00 0.00 206.00 1,228,917.69
5004+680.00 0.00 11.71 0.00 20.04 10.00 0.00 0.00 200.39 1,228,717.30
5004+700.00 0.00 17.72 0.00 29.43 10.00 0.00 0.00 294.28 1,228,423.02
5004+720.00 0.00 18.52 0.00 36.24 10.00 0.00 0.00 362.41 1,228,060.61
5004+740.00 0.00 16.20 0.00 34.72 10.00 0.00 0.00 347.18 1,227,713.43
5004+760.00 0.00 14.64 0.00 30.84 10.00 0.00 0.00 308.37 1,227,405.06
5004+780.00 0.00 13.11 0.00 27.75 10.00 0.00 0.00 277.52 1,227,127.54
5004+800.00 0.00 11.40 0.00 24.51 10.00 0.00 0.00 245.12 1,226,882.42
5004+800.00 0.00 12.06 0.00 23.45 0.00 0.00 0.00 0.00 1,226,882.42
5004+820.00 0.00 11.05 0.00 23.10 10.00 0.00 0.00 231.04 1,226,651.38
5004+840.00 0.00 10.41 0.00 21.46 10.00 0.00 0.00 214.57 1,226,436.81
5004+860.00 0.00 11.96 0.00 22.37 10.00 0.00 0.00 223.68 1,226,213.13
5004+880.00 0.00 13.83 0.00 25.79 10.00 0.00 0.00 257.89 1,225,955.24
5004+900.00 0.00 14.30 0.00 28.13 10.00 0.00 0.00 281.28 1,225,673.96
5004+920.00 0.00 13.68 0.00 27.98 10.00 0.00 0.00 279.81 1,225,394.15
5004+940.00 0.00 12.05 0.00 25.73 10.00 0.00 0.00 257.32 1,225,136.83
5004+960.00 0.00 11.56 0.00 23.61 10.00 0.00 0.00 236.14 1,224,900.69
5004+980.00 0.00 21.49 0.00 33.05 10.00 0.00 0.00 330.50 1,224,570.19
5004+980.00 0.00 22.24 0.00 43.72 0.00 0.00 0.00 0.00 1,224,570.19
5005+000.00 0.00 22.34 0.00 44.57 10.00 0.00 0.00 445.74 1,224,124.45
5005+020.00 0.00 22.49 0.00 44.83 10.00 0.00 0.00 448.27 1,223,676.18
5005+040.00 0.00 21.05 0.00 43.54 10.00 0.00 0.00 435.37 1,223,240.81
5005+060.00 0.00 19.72 0.00 40.77 10.00 0.00 0.00 407.66 1,222,833.15
5005+080.00 0.00 16.93 0.00 36.65 10.00 0.00 0.00 366.46 1,222,466.69
5005+100.00 0.00 13.14 0.00 30.07 10.00 0.00 0.00 300.67 1,222,166.02
5005+120.00 0.00 10.20 0.00 23.34 10.00 0.00 0.00 233.36 1,221,932.66
5005+140.00 0.00 10.62 0.00 20.82 10.00 0.00 0.00 208.21 1,221,724.45
5005+160.00 0.00 10.71 0.00 21.33 10.00 0.00 0.00 213.29 1,221,511.16
5005+180.00 0.00 8.85 0.00 19.55 10.00 0.00 0.00 195.50 1,221,315.66
5005+200.00 0.00 16.07 0.00 24.92 10.00 0.00 0.00 249.19 1,221,066.47
5005+220.00 0.00 17.19 0.00 33.27 10.00 0.00 0.00 332.67 1,220,733.80
5005+240.00 0.00 13.90 0.00 31.10 10.00 0.00 0.00 310.96 1,220,422.84
5005+260.00 0.00 9.34 0.00 23.25 10.00 0.00 0.00 232.47 1,220,190.37
5005+280.00 0.00 6.56 0.00 15.91 10.00 0.00 0.00 159.08 1,220,031.29
5005+300.00 0.00 8.86 0.00 15.42 10.00 0.00 0.00 154.21 1,219,877.08
197
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5005+320.00 0.00 9.05 0.00 17.91 10.00 0.00 0.00 179.11 1,219,697.97
5005+340.00 0.00 10.37 0.00 19.43 10.00 0.00 0.00 194.25 1,219,503.72
5005+360.00 0.00 8.09 0.00 18.46 10.00 0.00 0.00 184.61 1,219,319.11
5005+380.00 0.00 7.38 0.00 15.47 10.00 0.00 0.00 154.74 1,219,164.37
5005+400.00 0.44 7.21 0.44 14.59 10.00 4.38 5.69 145.93 1,219,024.14
5005+420.00 0.46 6.39 0.90 13.60 10.00 8.98 11.67 135.96 1,218,899.85
5005+440.00 0.00 5.75 0.46 12.13 10.00 4.60 5.98 121.32 1,218,784.51
5005+460.00 0.00 9.33 0.00 15.07 10.00 0.00 0.00 150.74 1,218,633.77
5005+480.00 0.00 13.44 0.00 22.76 10.00 0.00 0.00 227.64 1,218,406.13
5005+500.00 0.00 17.50 0.00 30.94 10.00 0.00 0.00 309.39 1,218,096.74
5005+520.00 0.00 22.16 0.00 39.67 10.00 0.00 0.00 396.66 1,217,700.08
5005+540.00 0.00 26.06 0.00 48.22 10.00 0.00 0.00 482.17 1,217,217.91
5005+560.00 0.00 18.19 0.00 44.25 10.00 0.00 0.00 442.47 1,216,775.44
5005+580.00 0.00 25.36 0.00 43.56 10.00 0.00 0.00 435.55 1,216,339.89
5005+600.00 0.00 30.51 0.00 55.88 10.00 0.00 0.00 558.75 1,215,781.14
5005+620.00 0.00 30.98 0.00 61.49 10.00 0.00 0.00 614.93 1,215,166.21
5005+640.00 0.00 29.36 0.00 60.34 10.00 0.00 0.00 603.37 1,214,562.84
5005+660.00 0.00 31.81 0.00 61.17 10.00 0.00 0.00 611.70 1,213,951.14
5005+680.00 0.00 36.62 0.00 68.44 10.00 0.00 0.00 684.36 1,213,266.78
5005+680.00 0.00 33.16 0.00 69.78 0.00 0.00 0.00 0.00 1,213,266.78
5005+700.00 0.00 36.38 0.00 69.53 10.00 0.00 0.00 695.34 1,212,571.44
5005+720.00 0.00 35.85 0.00 72.23 10.00 0.00 0.00 722.28 1,211,849.16
5005+740.00 0.00 34.35 0.00 70.20 10.00 0.00 0.00 702.00 1,211,147.16
5005+760.00 0.00 39.09 0.00 73.44 10.00 0.00 0.00 734.42 1,210,412.74
5005+780.00 0.00 44.24 0.00 83.33 10.00 0.00 0.00 833.31 1,209,579.43
5005+800.00 0.00 40.15 0.00 84.39 10.00 0.00 0.00 843.93 1,208,735.50
5005+820.00 0.00 33.13 0.00 73.28 10.00 0.00 0.00 732.82 1,208,002.68
5005+840.00 0.00 32.62 0.00 65.75 10.00 0.00 0.00 657.50 1,207,345.18
5005+860.00 0.00 33.26 0.00 65.88 10.00 0.00 0.00 658.84 1,206,686.34
5005+880.00 0.00 32.30 0.00 65.56 10.00 0.00 0.00 655.59 1,206,030.75
5005+890.00 0.00 32.56 0.00 64.85 5.00 0.00 0.00 324.26 1,205,706.49
5005+890.00 0.00 33.43 0.00 65.99 0.00 0.00 0.00 0.00 1,205,706.49
5005+900.00 0.00 33.71 0.00 67.14 5.00 0.00 0.00 335.71 1,205,370.79
5005+920.00 0.00 33.84 0.00 67.56 10.00 0.00 0.00 675.55 1,204,695.24
5005+940.00 0.00 33.90 0.00 67.74 10.00 0.00 0.00 677.43 1,204,017.81
5005+960.00 0.00 35.06 0.00 68.96 10.00 0.00 0.00 689.61 1,203,328.20
5005+980.00 0.00 35.29 0.00 70.35 10.00 0.00 0.00 703.47 1,202,624.73
5006+000.00 0.00 36.60 0.00 71.89 10.00 0.00 0.00 718.88 1,201,905.85
5006+020.00 0.00 35.85 0.00 72.46 10.00 0.00 0.00 724.57 1,201,181.28
5006+040.00 0.00 31.83 0.00 67.68 10.00 0.00 0.00 676.79 1,200,504.49
5006+060.00 0.00 29.14 0.00 60.96 10.00 0.00 0.00 609.61 1,199,894.88
5006+080.00 0.00 27.99 0.00 57.13 10.00 0.00 0.00 571.30 1,199,323.58
5006+100.00 0.00 24.02 0.00 52.02 10.00 0.00 0.00 520.18 1,198,803.40
5006+120.00 0.00 18.49 0.00 42.52 10.00 0.00 0.00 425.17 1,198,378.23
5006+140.00 0.00 18.16 0.00 36.66 10.00 0.00 0.00 366.57 1,198,011.66
198
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5006+160.00 0.00 14.81 0.00 32.98 10.00 0.00 0.00 329.78 1,197,681.88
5006+180.00 0.00 16.89 0.00 31.70 10.00 0.00 0.00 317.04 1,197,364.84
5006+200.00 0.00 17.46 0.00 34.35 10.00 0.00 0.00 343.50 1,197,021.34
5006+220.00 0.00 20.45 0.00 37.91 10.00 0.00 0.00 379.14 1,196,642.20
5006+240.00 0.00 24.52 0.00 44.98 10.00 0.00 0.00 449.78 1,196,192.42
5006+260.00 0.00 26.89 0.00 51.41 10.00 0.00 0.00 514.11 1,195,678.31
5006+280.00 0.00 27.34 0.00 54.23 10.00 0.00 0.00 542.30 1,195,136.01
5006+300.00 0.00 20.93 0.00 48.28 10.00 0.00 0.00 482.76 1,194,653.25
5006+310.00 0.00 17.26 0.00 38.19 5.00 0.00 0.00 190.97 1,194,462.28
5006+310.00 0.00 17.26 0.00 34.52 0.00 0.00 0.00 0.02 1,194,462.26
5006+320.00 0.00 13.76 0.00 31.03 5.00 0.00 0.00 155.11 1,194,307.15
5006+340.00 0.00 13.00 0.00 26.76 10.00 0.00 0.00 267.61 1,194,039.54
5006+360.00 0.00 17.40 0.00 30.40 10.00 0.00 0.00 303.98 1,193,735.56
5006+380.00 0.00 23.20 0.00 40.60 10.00 0.00 0.00 405.98 1,193,329.58
5006+400.00 0.00 21.11 0.00 44.31 10.00 0.00 0.00 443.09 1,192,886.49
5006+420.00 0.00 20.24 0.00 41.35 10.00 0.00 0.00 413.47 1,192,473.02
5006+440.00 0.00 19.83 0.00 40.07 10.00 0.00 0.00 400.65 1,192,072.37
5006+460.00 0.00 20.18 0.00 40.01 10.00 0.00 0.00 400.09 1,191,672.28
5006+480.00 0.00 11.72 0.00 31.90 10.00 0.00 0.00 318.99 1,191,353.29
5006+500.00 0.00 15.22 0.00 26.94 10.00 0.00 0.00 269.43 1,191,083.86
5006+520.00 0.00 8.60 0.00 23.82 10.00 0.00 0.00 238.22 1,190,845.64
5006+540.00 0.00 15.40 0.00 23.99 10.00 0.00 0.00 239.94 1,190,605.70
5006+560.00 0.00 17.49 0.00 32.89 10.00 0.00 0.00 328.89 1,190,276.81
5006+580.00 0.00 16.93 0.00 34.43 10.00 0.00 0.00 344.25 1,189,932.56
5006+600.00 0.00 17.01 0.00 33.95 10.00 0.00 0.00 339.45 1,189,593.11
5006+620.00 0.00 6.44 0.00 23.45 10.00 0.00 0.00 234.54 1,189,358.57
5006+640.00 0.00 7.68 0.00 14.12 10.00 0.00 0.00 141.23 1,189,217.34
5006+660.00 0.00 14.02 0.00 21.70 10.00 0.00 0.00 217.04 1,189,000.30
5006+680.00 0.00 4.89 0.00 18.91 10.00 0.00 0.00 189.06 1,188,811.24
5006+700.00 0.00 5.29 0.00 10.17 10.00 0.00 0.00 101.74 1,188,709.50
5006+720.00 1.57 0.71 1.57 6.00 10.00 15.65 20.35 59.95 1,188,669.89
5006+740.00 0.70 2.92 2.27 3.62 10.00 22.69 29.50 36.22 1,188,663.17
5006+760.00 0.66 2.74 1.37 5.66 10.00 13.68 17.78 56.60 1,188,624.35
5006+780.00 0.00 4.16 0.66 6.90 10.00 6.64 8.63 69.04 1,188,563.95
5006+790.00 0.77 2.89 0.77 7.05 5.00 3.84 4.99 35.25 1,188,533.69
5006+800.00 0.57 2.05 1.34 4.94 5.00 6.70 8.71 24.68 1,188,517.72
5006+810.00 9.45 0.04 10.02 2.09 5.00 50.11 65.14 10.45 1,188,572.41
5006+820.00 0.00 3.79 9.45 3.83 5.00 47.25 61.42 19.17 1,188,614.66
5006+830.00 0.00 7.06 0.00 10.85 5.00 0.00 0.00 54.26 1,188,560.40
5006+840.00 0.00 10.74 0.00 17.80 5.00 0.00 0.00 89.02 1,188,471.38
5006+850.00 0.00 10.98 0.00 21.72 5.00 0.00 0.00 108.62 1,188,362.76
5006+860.00 0.00 11.19 0.00 22.17 5.00 0.00 0.00 110.87 1,188,251.89
5006+870.00 0.00 10.84 0.00 22.03 5.00 0.00 0.00 110.15 1,188,141.75
5006+880.00 0.00 10.45 0.00 21.29 5.00 0.00 0.00 106.45 1,188,035.30
5006+890.00 0.00 11.14 0.00 21.59 5.00 0.00 0.00 107.96 1,187,927.34
199
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5006+900.00 0.00 11.85 0.00 22.99 5.00 0.00 0.00 114.97 1,187,812.37
5006+910.00 0.00 11.98 0.00 23.84 5.00 0.00 0.00 119.18 1,187,693.20
5006+920.00 0.00 12.20 0.00 24.18 5.00 0.00 0.00 120.89 1,187,572.31
5006+930.00 0.00 11.83 0.00 24.03 5.00 0.00 0.00 120.13 1,187,452.18
5006+940.00 0.00 11.38 0.00 23.21 5.00 0.00 0.00 116.06 1,187,336.12
5006+950.00 0.00 10.80 0.00 22.19 5.00 0.00 0.00 110.94 1,187,225.19
5006+960.00 0.00 10.62 0.00 21.43 5.00 0.00 0.00 107.13 1,187,118.06
5006+970.00 0.00 11.55 0.00 22.17 5.00 0.00 0.00 110.84 1,187,007.22
5006+980.00 0.00 12.22 0.00 23.76 5.00 0.00 0.00 118.82 1,186,888.40
5007+000.00 0.00 12.62 0.00 24.83 10.00 0.00 0.00 248.34 1,186,640.06
5007+020.00 0.00 14.34 0.00 26.96 10.00 0.00 0.00 269.56 1,186,370.50
5007+040.00 0.00 12.08 0.00 26.42 10.00 0.00 0.00 264.17 1,186,106.33
5007+060.00 0.00 9.78 0.00 21.85 10.00 0.00 0.00 218.52 1,185,887.81
5007+080.00 0.00 16.91 0.00 26.68 10.00 0.00 0.00 266.81 1,185,621.00
5007+100.00 0.00 19.92 0.00 36.82 10.00 0.00 0.00 368.21 1,185,252.79
5007+120.00 0.00 15.08 0.00 35.00 10.00 0.00 0.00 349.96 1,184,902.83
5007+140.00 0.00 14.85 0.00 29.93 10.00 0.00 0.00 299.26 1,184,603.57
5007+160.00 0.00 12.59 0.00 27.44 10.00 0.00 0.00 274.38 1,184,329.19
5007+180.00 0.00 12.09 0.00 24.68 10.00 0.00 0.00 246.79 1,184,082.40
5007+180.00 0.00 13.51 0.00 25.60 0.00 0.00 0.00 0.00 1,184,082.40
5007+200.00 0.00 16.20 0.00 29.71 10.00 0.00 0.00 297.11 1,183,785.29
5007+220.00 0.00 18.59 0.00 34.79 10.00 0.00 0.00 347.87 1,183,437.42
5007+240.00 0.00 10.88 0.00 29.46 10.00 0.00 0.00 294.63 1,183,142.79
5007+260.00 0.00 12.37 0.00 23.25 10.00 0.00 0.00 232.47 1,182,910.32
5007+280.00 0.00 14.14 0.00 26.51 10.00 0.00 0.00 265.12 1,182,645.20
5007+300.00 0.00 13.14 0.00 27.28 10.00 0.00 0.00 272.77 1,182,372.43
5007+320.00 0.00 16.10 0.00 29.24 10.00 0.00 0.00 292.38 1,182,080.05
5007+340.00 0.00 17.39 0.00 33.49 10.00 0.00 0.00 334.92 1,181,745.13
5007+360.00 0.00 18.10 0.00 35.49 10.00 0.00 0.00 354.87 1,181,390.26
5007+360.00 0.00 23.99 0.00 42.09 0.00 0.00 0.00 0.00 1,181,390.26
5007+380.00 0.00 17.73 0.00 41.72 10.00 0.00 0.00 417.22 1,180,973.04
5007+400.00 0.00 26.75 0.00 44.48 10.00 0.00 0.00 444.81 1,180,528.23
5007+420.00 0.00 30.31 0.00 57.06 10.00 0.00 0.00 570.63 1,179,957.60
5007+440.00 0.00 25.36 0.00 55.67 10.00 0.00 0.00 556.71 1,179,400.89
5007+460.00 0.00 23.88 0.00 49.24 10.00 0.00 0.00 492.42 1,178,908.47
5007+480.00 0.00 22.95 0.00 46.83 10.00 0.00 0.00 468.33 1,178,440.14
5007+500.00 0.00 26.37 0.00 49.32 10.00 0.00 0.00 493.18 1,177,946.96
5007+520.00 0.00 29.48 0.00 55.85 10.00 0.00 0.00 558.48 1,177,388.48
5007+540.00 0.00 30.90 0.00 60.38 10.00 0.00 0.00 603.79 1,176,784.69
5007+560.00 0.00 32.49 0.00 63.39 10.00 0.00 0.00 633.85 1,176,150.84
5007+580.00 0.00 35.23 0.00 67.72 10.00 0.00 0.00 677.17 1,175,473.67
5007+600.00 0.00 32.46 0.00 67.69 10.00 0.00 0.00 676.89 1,174,796.78
5007+620.00 0.00 21.20 0.00 53.65 10.00 0.00 0.00 536.53 1,174,260.25
5007+640.00 0.00 14.72 0.00 35.92 10.00 0.00 0.00 359.15 1,173,901.10
5007+660.00 0.00 20.10 0.00 34.82 10.00 0.00 0.00 348.20 1,173,552.90
200
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5007+680.00 0.00 17.38 0.00 37.48 10.00 0.00 0.00 374.84 1,173,178.06
5007+700.00 0.00 20.26 0.00 37.64 10.00 0.00 0.00 376.44 1,172,801.62
5007+720.00 0.00 46.91 0.00 67.17 10.00 0.00 0.00 671.67 1,172,129.95
5007+740.00 0.00 48.23 0.00 95.13 10.00 0.00 0.00 951.31 1,171,178.64
5007+760.00 0.00 41.73 0.00 89.95 10.00 0.00 0.00 899.54 1,170,279.10
5007+780.00 0.00 27.56 0.00 69.29 10.00 0.00 0.00 692.89 1,169,586.21
5007+800.00 0.00 30.29 0.00 57.85 10.00 0.00 0.00 578.54 1,169,007.67
5007+820.00 0.00 34.09 0.00 64.39 10.00 0.00 0.00 643.86 1,168,363.81
5007+840.00 0.00 29.58 0.00 63.67 10.00 0.00 0.00 636.68 1,167,727.13
5007+860.00 0.00 27.78 0.00 57.36 10.00 0.00 0.00 573.58 1,167,153.55
5007+880.00 0.00 21.81 0.00 49.59 10.00 0.00 0.00 495.87 1,166,657.68
5007+900.00 0.00 20.36 0.00 42.17 10.00 0.00 0.00 421.69 1,166,235.99
5007+920.00 0.00 19.40 0.00 39.76 10.00 0.00 0.00 397.63 1,165,838.36
5007+940.00 0.00 20.33 0.00 39.73 10.00 0.00 0.00 397.26 1,165,441.10
5007+960.00 0.00 18.80 0.00 39.13 10.00 0.00 0.00 391.27 1,165,049.83
5007+980.00 0.00 18.43 0.00 37.23 10.00 0.00 0.00 372.32 1,164,677.51
5008+000.00 0.00 25.99 0.00 44.43 10.00 0.00 0.00 444.25 1,164,233.26
5008+020.00 0.00 22.01 0.00 48.00 10.00 0.00 0.00 480.03 1,163,753.23
5008+040.00 0.00 13.96 0.00 35.97 10.00 0.00 0.00 359.72 1,163,393.51
5008+060.00 0.00 21.22 0.00 35.18 10.00 0.00 0.00 351.84 1,163,041.67
5008+080.00 0.00 24.38 0.00 45.60 10.00 0.00 0.00 455.99 1,162,585.68
5008+100.00 0.00 21.41 0.00 45.79 10.00 0.00 0.00 457.85 1,162,127.83
5008+120.00 0.00 16.60 0.00 38.01 10.00 0.00 0.00 380.08 1,161,747.75
5008+140.00 0.00 20.52 0.00 37.12 10.00 0.00 0.00 371.24 1,161,376.51
5008+155.00 0.00 24.59 0.00 45.11 7.50 0.00 0.00 338.36 1,161,038.16
5008+155.00 0.00 23.66 0.00 48.25 0.00 0.00 0.00 0.00 1,161,038.16
5008+160.00 0.00 25.08 0.00 48.73 2.50 0.00 0.00 121.83 1,160,916.33
5008+180.00 0.00 22.27 0.00 47.35 10.00 0.00 0.00 473.45 1,160,442.88
5008+200.00 0.00 22.23 0.00 44.50 10.00 0.00 0.00 444.96 1,159,997.92
5008+220.00 0.00 19.54 0.00 41.76 10.00 0.00 0.00 417.62 1,159,580.30
5008+240.00 0.13 12.48 0.13 32.02 10.00 1.34 1.74 320.17 1,159,261.87
5008+260.00 0.00 20.94 0.13 33.42 10.00 1.34 1.74 334.20 1,158,929.41
5008+280.00 0.00 19.77 0.00 40.71 10.00 0.00 0.00 407.05 1,158,522.36
5008+300.00 0.00 20.96 0.00 40.73 10.00 0.00 0.00 407.28 1,158,115.08
5008+320.00 0.00 19.15 0.00 40.11 10.00 0.00 0.00 401.10 1,157,713.98
5008+340.00 0.00 20.19 0.00 39.34 10.00 0.00 0.00 393.40 1,157,320.58
5008+360.00 0.00 17.71 0.00 37.90 10.00 0.00 0.00 378.97 1,156,941.61
5008+380.00 0.00 15.54 0.00 33.24 10.00 0.00 0.00 332.43 1,156,609.18
5008+380.00 0.00 10.34 0.00 25.88 0.00 0.00 0.00 0.00 1,156,609.18
5008+400.00 0.00 10.31 0.00 20.66 10.00 0.00 0.00 206.57 1,156,402.61
5008+420.00 0.00 13.14 0.00 23.45 10.00 0.00 0.00 234.50 1,156,168.11
5008+440.00 0.00 16.20 0.00 29.34 10.00 0.00 0.00 293.35 1,155,874.76
5008+460.00 0.00 10.67 0.00 26.87 10.00 0.00 0.00 268.67 1,155,606.09
5008+470.00 0.00 9.02 0.00 19.69 5.00 0.00 0.00 98.46 1,155,507.64
5008+480.00 0.64 7.47 0.64 16.49 5.00 3.20 4.16 82.46 1,155,429.34
201
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5008+490.00 0.00 10.54 0.64 18.01 5.00 3.20 4.16 90.05 1,155,343.46
5008+500.00 0.00 13.85 0.00 24.39 5.00 0.00 0.00 121.95 1,155,221.51
5008+510.00 0.00 17.51 0.00 31.36 5.00 0.00 0.00 156.81 1,155,064.70
5008+520.00 0.00 21.09 0.00 38.61 5.00 0.00 0.00 193.03 1,154,871.68
5008+530.00 0.00 21.56 0.00 42.65 5.00 0.00 0.00 213.27 1,154,658.41
5008+540.00 0.00 21.60 0.00 43.16 5.00 0.00 0.00 215.79 1,154,442.62
5008+550.00 0.00 20.92 0.00 42.52 5.00 0.00 0.00 212.58 1,154,230.05
5008+560.00 0.00 19.82 0.00 40.74 5.00 0.00 0.00 203.70 1,154,026.35
5008+570.00 0.00 18.17 0.00 37.99 5.00 0.00 0.00 189.95 1,153,836.41
5008+580.00 0.00 16.56 0.00 34.73 5.00 0.00 0.00 173.66 1,153,662.75
5008+590.00 0.00 15.75 0.00 32.31 5.00 0.00 0.00 161.56 1,153,501.19
5008+600.00 0.00 15.14 0.00 30.89 5.00 0.00 0.00 154.43 1,153,346.77
5008+610.00 0.00 15.72 0.00 30.86 5.00 0.00 0.00 154.28 1,153,192.49
5008+620.00 0.00 16.67 0.00 32.39 5.00 0.00 0.00 161.94 1,153,030.55
5008+629.97 0.00 15.46 0.00 32.12 4.98 0.00 0.00 160.13 1,152,870.42
5008+629.97 0.00 15.46 0.00 30.91 0.00 0.00 0.00 0.02 1,152,870.40
5008+640.00 0.00 14.77 0.00 30.22 5.01 0.00 0.00 151.55 1,152,718.86
5008+649.97 0.00 11.68 0.00 26.45 4.98 0.00 0.00 131.83 1,152,587.02
5008+649.97 0.00 11.68 0.00 23.36 0.00 0.00 0.00 0.01 1,152,587.01
5008+660.00 0.00 8.47 0.00 20.15 5.01 0.00 0.00 101.04 1,152,485.97
5008+680.00 0.00 8.22 0.00 16.69 10.00 0.00 0.00 166.92 1,152,319.05
5008+700.00 0.00 7.95 0.00 16.18 10.00 0.00 0.00 161.76 1,152,157.29
5008+720.00 0.57 2.33 0.57 10.28 10.00 5.72 7.44 102.83 1,152,061.90
5008+740.00 0.00 8.31 0.57 10.64 10.00 5.72 7.44 106.41 1,151,962.93
5008+760.00 0.00 8.86 0.00 17.17 10.00 0.00 0.00 171.73 1,151,791.20
5008+780.00 0.00 11.20 0.00 20.06 10.00 0.00 0.00 200.57 1,151,590.63
5008+800.00 0.00 15.37 0.00 26.56 10.00 0.00 0.00 265.61 1,151,325.02
5008+820.00 0.00 14.52 0.00 29.89 10.00 0.00 0.00 298.85 1,151,026.17
5008+840.00 0.00 15.85 0.00 30.37 10.00 0.00 0.00 303.66 1,150,722.51
5008+860.00 0.00 14.62 0.00 30.47 10.00 0.00 0.00 304.65 1,150,417.86
5008+880.00 0.00 12.22 0.00 26.84 10.00 0.00 0.00 268.38 1,150,149.48
5008+900.00 0.00 11.76 0.00 23.98 10.00 0.00 0.00 239.83 1,149,909.65
5008+920.00 0.00 13.73 0.00 25.50 10.00 0.00 0.00 254.98 1,149,654.67
5008+940.00 0.00 12.57 0.00 26.30 10.00 0.00 0.00 263.01 1,149,391.66
5008+960.00 0.00 12.58 0.00 25.15 10.00 0.00 0.00 251.47 1,149,140.19
5008+980.00 0.00 8.58 0.00 21.16 10.00 0.00 0.00 211.64 1,148,928.55
5009+000.00 0.00 5.02 0.00 13.61 10.00 0.00 0.00 136.06 1,148,792.49
5009+020.00 0.00 4.58 0.00 9.60 10.00 0.00 0.00 96.00 1,148,696.49
5009+040.00 0.00 13.22 0.00 17.80 10.00 0.00 0.00 177.95 1,148,518.54
5009+060.00 0.00 18.17 0.00 31.39 10.00 0.00 0.00 313.86 1,148,204.68
5009+080.00 0.00 17.93 0.00 36.10 10.00 0.00 0.00 360.99 1,147,843.69
5009+090.00 0.00 15.99 0.00 33.92 5.00 0.00 0.00 169.59 1,147,674.10
5009+090.00 0.00 15.99 0.00 31.97 0.00 0.00 0.00 0.00 1,147,674.10
5009+100.00 0.00 13.92 0.00 29.91 5.00 0.00 0.00 149.53 1,147,524.58
5009+120.00 0.00 32.23 0.00 46.15 10.00 0.00 0.00 461.51 1,147,063.07
202
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5009+130.00 0.00 36.94 0.00 69.18 5.00 0.00 0.00 345.88 1,146,717.19
5009+140.00 0.00 41.57 0.00 78.52 5.00 0.00 0.00 392.58 1,146,324.61
5009+160.00 0.00 42.25 0.00 83.82 10.00 0.00 0.00 838.19 1,145,486.42
5009+180.00 0.00 39.87 0.00 82.12 10.00 0.00 0.00 821.18 1,144,665.24
5009+200.00 0.00 28.57 0.00 68.44 10.00 0.00 0.00 684.36 1,143,980.88
5009+200.00 0.00 33.98 0.00 62.55 0.00 0.00 0.00 0.00 1,143,980.88
5009+220.00 0.00 27.36 0.00 61.34 10.00 0.00 0.00 613.42 1,143,367.46
5009+240.00 0.00 30.70 0.00 58.06 10.00 0.00 0.00 580.58 1,142,786.88
5009+260.00 0.00 29.21 0.00 59.91 10.00 0.00 0.00 599.12 1,142,187.76
5009+280.00 0.00 25.43 0.00 54.64 10.00 0.00 0.00 546.43 1,141,641.33
5009+300.00 0.00 18.86 0.00 44.29 10.00 0.00 0.00 442.90 1,141,198.43
5009+320.00 0.00 16.84 0.00 35.70 10.00 0.00 0.00 357.02 1,140,841.41
5009+340.00 0.00 16.67 0.00 33.51 10.00 0.00 0.00 335.12 1,140,506.29
5009+360.00 0.00 16.23 0.00 32.90 10.00 0.00 0.00 328.95 1,140,177.34
5009+380.00 0.00 13.72 0.00 29.94 10.00 0.00 0.00 299.43 1,139,877.91
5009+400.00 0.10 8.74 0.10 22.46 10.00 0.95 1.24 224.55 1,139,654.60
5009+420.00 0.00 15.49 0.10 24.23 10.00 0.95 1.24 242.25 1,139,413.58
5009+440.00 0.00 22.09 0.00 37.58 10.00 0.00 0.00 375.80 1,139,037.78
5009+460.00 0.00 22.42 0.00 44.51 10.00 0.00 0.00 445.14 1,138,592.64
5009+480.00 0.00 20.73 0.00 43.16 10.00 0.00 0.00 431.55 1,138,161.09
5009+500.00 0.00 18.72 0.00 39.45 10.00 0.00 0.00 394.53 1,137,766.56
5009+520.00 0.00 20.20 0.00 38.92 10.00 0.00 0.00 389.17 1,137,377.39
5009+540.00 0.00 21.58 0.00 41.78 10.00 0.00 0.00 417.80 1,136,959.59
5009+560.00 0.00 20.67 0.00 42.25 10.00 0.00 0.00 422.54 1,136,537.05
5009+580.00 0.00 21.51 0.00 42.18 10.00 0.00 0.00 421.78 1,136,115.27
5009+587.89 0.00 18.56 0.00 40.06 3.94 0.00 0.00 157.95 1,135,957.32
5009+600.00 0.00 14.29 0.00 32.84 6.06 0.00 0.00 198.95 1,135,758.37
5009+620.00 0.00 10.51 0.00 24.80 10.00 0.00 0.00 247.95 1,135,510.42
5009+640.00 0.17 10.00 0.17 20.51 10.00 1.70 2.21 205.09 1,135,307.54
5009+660.00 0.21 9.10 0.38 19.10 10.00 3.81 4.95 190.97 1,135,121.52
5009+680.00 0.00 11.63 0.21 20.72 10.00 2.11 2.74 207.24 1,134,917.03
5009+700.00 0.00 14.89 0.00 26.52 10.00 0.00 0.00 265.17 1,134,651.86
5009+717.89 0.00 14.62 0.00 29.51 8.94 0.00 0.00 263.89 1,134,387.96
5009+720.00 0.00 14.60 0.00 29.22 1.06 0.00 0.00 30.90 1,134,357.06
5009+740.00 0.00 14.33 0.00 28.93 10.00 0.00 0.00 289.32 1,134,067.74
5009+760.00 0.00 17.43 0.00 31.76 10.00 0.00 0.00 317.63 1,133,750.11
5009+780.00 0.00 20.38 0.00 37.81 10.00 0.00 0.00 378.13 1,133,371.98
5009+800.00 0.00 18.40 0.00 38.78 10.00 0.00 0.00 387.79 1,132,984.19
5009+817.42 0.00 16.63 0.00 35.03 8.71 0.00 0.00 305.06 1,132,679.13
5009+820.00 0.00 16.44 0.00 33.07 1.29 0.00 0.00 42.72 1,132,636.42
5009+840.00 0.00 11.70 0.00 28.14 10.00 0.00 0.00 281.38 1,132,355.04
5009+850.00 0.00 10.41 0.00 22.11 5.00 0.00 0.00 110.54 1,132,244.50
5009+850.00 0.00 7.40 0.00 17.81 0.00 0.00 0.00 0.00 1,132,244.50
5009+860.00 0.00 6.12 0.00 13.51 5.00 0.00 0.00 67.57 1,132,176.93
5009+880.00 0.00 6.32 0.00 12.44 10.00 0.00 0.00 124.35 1,132,052.58
203
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5009+900.00 0.00 7.59 0.00 13.91 10.00 0.00 0.00 139.06 1,131,913.52
5009+920.00 0.00 7.62 0.00 15.21 10.00 0.00 0.00 152.12 1,131,761.40
5009+940.00 0.00 16.41 0.00 24.04 10.00 0.00 0.00 240.37 1,131,521.03
5009+947.42 0.00 13.16 0.00 29.57 3.71 0.00 0.00 109.68 1,131,411.36
5009+960.00 0.00 7.69 0.00 20.86 6.29 0.00 0.00 131.21 1,131,280.15
5009+980.00 0.00 16.20 0.00 23.89 10.00 0.00 0.00 238.91 1,131,041.24
5010+000.00 0.00 15.15 0.00 31.35 10.00 0.00 0.00 313.46 1,130,727.78
5010+020.00 0.00 15.72 0.00 30.87 10.00 0.00 0.00 308.66 1,130,419.12
5010+040.00 0.00 15.42 0.00 31.13 10.00 0.00 0.00 311.33 1,130,107.79
5010+060.00 0.00 12.39 0.00 27.80 10.00 0.00 0.00 278.03 1,129,829.76
5010+080.00 0.00 12.66 0.00 25.05 10.00 0.00 0.00 250.46 1,129,579.30
5010+100.00 0.00 11.17 0.00 23.83 10.00 0.00 0.00 238.30 1,129,341.00
5010+120.00 0.00 9.20 0.00 20.38 10.00 0.00 0.00 203.75 1,129,137.25
5010+140.00 0.00 7.55 0.00 16.76 10.00 0.00 0.00 167.58 1,128,969.67
5010+160.00 0.00 12.09 0.00 19.64 10.00 0.00 0.00 196.41 1,128,773.26
5010+180.00 0.00 13.25 0.00 25.34 10.00 0.00 0.00 253.39 1,128,519.87
5010+200.00 0.00 12.18 0.00 25.43 10.00 0.00 0.00 254.27 1,128,265.60
5010+220.00 0.00 9.33 0.00 21.50 10.00 0.00 0.00 215.02 1,128,050.58
5010+240.00 0.00 11.12 0.00 20.44 10.00 0.00 0.00 204.42 1,127,846.16
5010+260.00 0.00 8.00 0.00 19.11 10.00 0.00 0.00 191.10 1,127,655.06
5010+280.00 0.69 5.59 0.69 13.58 10.00 6.89 8.96 135.82 1,127,528.20
5010+300.00 0.50 4.88 1.19 10.47 10.00 11.92 15.50 104.69 1,127,439.00
5010+320.00 0.54 3.89 1.05 8.77 10.00 10.46 13.60 87.74 1,127,364.86
5010+340.00 0.91 3.42 1.45 7.31 10.00 14.53 18.89 73.09 1,127,310.66
5010+360.00 0.83 5.07 1.74 8.48 10.00 17.37 22.58 84.82 1,127,248.42
5010+380.00 0.00 11.13 0.83 16.20 10.00 8.27 10.75 161.96 1,127,097.21
5010+400.00 0.00 9.81 0.00 20.94 10.00 0.00 0.00 209.36 1,126,887.85
5010+420.00 0.00 9.04 0.00 18.84 10.00 0.00 0.00 188.41 1,126,699.44
5010+440.00 0.00 7.05 0.00 16.09 10.00 0.00 0.00 160.86 1,126,538.58
5010+460.00 0.00 11.02 0.00 18.07 10.00 0.00 0.00 180.72 1,126,357.86
5010+480.00 0.00 13.90 0.00 24.92 10.00 0.00 0.00 249.23 1,126,108.63
5010+500.00 0.00 14.58 0.00 28.48 10.00 0.00 0.00 284.83 1,125,823.80
5010+520.00 0.00 9.68 0.00 24.26 10.00 0.00 0.00 242.59 1,125,581.21
5010+540.00 0.00 7.38 0.00 17.06 10.00 0.00 0.00 170.60 1,125,410.61
5010+560.00 0.00 7.14 0.00 14.52 10.00 0.00 0.00 145.20 1,125,265.41
5010+580.00 0.00 7.11 0.00 14.24 10.00 0.00 0.00 142.44 1,125,122.97
5010+600.00 0.00 10.21 0.00 17.32 10.00 0.00 0.00 173.20 1,124,949.77
5010+620.00 0.00 10.36 0.00 20.57 10.00 0.00 0.00 205.68 1,124,744.09
5010+640.00 0.00 7.99 0.00 18.35 10.00 0.00 0.00 183.49 1,124,560.60
5010+660.00 0.00 6.40 0.00 14.40 10.00 0.00 0.00 143.95 1,124,416.65
5010+680.00 0.00 6.56 0.00 12.96 10.00 0.00 0.00 129.64 1,124,287.01
5010+700.00 0.56 5.90 0.56 12.46 10.00 5.64 7.33 124.63 1,124,169.71
5010+720.00 0.00 10.04 0.56 15.94 10.00 5.64 7.33 159.38 1,124,017.66
5010+740.00 0.00 6.99 0.00 17.03 10.00 0.00 0.00 170.31 1,123,847.35
5010+760.00 0.62 4.99 0.62 11.98 10.00 6.16 8.01 119.81 1,123,735.55
204
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5010+780.00 0.81 4.50 1.43 9.48 10.00 14.30 18.59 94.84 1,123,659.30
5010+800.00 0.00 6.60 0.81 11.09 10.00 8.14 10.58 110.92 1,123,558.96
5010+820.00 0.00 7.27 0.00 13.87 10.00 0.00 0.00 138.69 1,123,420.27
5010+840.00 0.00 8.56 0.00 15.84 10.00 0.00 0.00 158.35 1,123,261.92
5010+860.00 0.00 9.42 0.00 17.99 10.00 0.00 0.00 179.85 1,123,082.07
5010+880.00 0.00 8.97 0.00 18.39 10.00 0.00 0.00 183.90 1,122,898.17
5010+900.00 0.00 12.08 0.00 21.05 10.00 0.00 0.00 210.50 1,122,687.67
5010+920.00 0.00 17.20 0.00 29.28 10.00 0.00 0.00 292.78 1,122,394.89
5010+940.00 0.00 17.02 0.00 34.21 10.00 0.00 0.00 342.14 1,122,052.75
5010+960.00 0.00 16.93 0.00 33.95 10.00 0.00 0.00 339.47 1,121,713.28
5010+980.00 0.00 19.21 0.00 36.14 10.00 0.00 0.00 361.35 1,121,351.93
5011+000.00 0.00 15.36 0.00 34.57 10.00 0.00 0.00 345.68 1,121,006.25
5011+020.00 0.00 9.81 0.00 25.17 10.00 0.00 0.00 251.66 1,120,754.59
5011+040.00 0.00 11.07 0.00 20.87 10.00 0.00 0.00 208.73 1,120,545.86
5011+060.00 0.00 12.52 0.00 23.59 10.00 0.00 0.00 235.87 1,120,309.99
5011+080.00 0.00 13.42 0.00 25.94 10.00 0.00 0.00 259.42 1,120,050.57
5011+100.00 0.00 6.23 0.00 19.65 10.00 0.00 0.00 196.51 1,119,854.06
5011+120.00 0.52 7.50 0.52 13.73 10.00 5.22 6.79 137.30 1,119,723.55
5011+140.00 0.00 5.93 0.52 13.43 10.00 5.22 6.79 134.29 1,119,596.05
5011+160.00 0.00 7.07 0.00 13.00 10.00 0.00 0.00 129.97 1,119,466.08
5011+180.00 1.39 3.48 1.39 10.55 10.00 13.87 18.03 105.51 1,119,378.60
5011+200.00 0.00 7.77 1.39 11.25 10.00 13.87 18.03 112.53 1,119,284.10
5011+220.00 0.00 6.93 0.00 14.70 10.00 0.00 0.00 147.00 1,119,137.10
5011+240.00 0.00 7.81 0.00 14.74 10.00 0.00 0.00 147.39 1,118,989.71
5011+260.00 0.00 7.47 0.00 15.28 10.00 0.00 0.00 152.78 1,118,836.93
5011+280.00 0.47 4.38 0.47 11.85 10.00 4.73 6.15 118.49 1,118,724.59
5011+300.00 0.00 6.67 0.47 11.05 10.00 4.73 6.15 110.47 1,118,620.27
5011+320.00 0.00 5.03 0.00 11.69 10.00 0.00 0.00 116.94 1,118,503.33
5011+340.00 0.00 5.00 0.00 10.03 10.00 0.00 0.00 100.33 1,118,403.00
5011+360.00 0.00 6.57 0.00 11.57 10.00 0.00 0.00 115.70 1,118,287.30
5011+380.00 0.00 8.62 0.00 15.19 10.00 0.00 0.00 151.87 1,118,135.43
5011+400.00 0.00 10.17 0.00 18.79 10.00 0.00 0.00 187.93 1,117,947.50
5011+420.00 0.00 8.60 0.00 18.77 10.00 0.00 0.00 187.67 1,117,759.83
5011+420.00 0.00 10.08 0.00 18.67 0.00 0.00 0.00 0.00 1,117,759.83
5011+440.00 0.00 10.04 0.00 20.12 10.00 0.00 0.00 201.19 1,117,558.64
5011+460.00 0.00 17.79 0.00 27.83 10.00 0.00 0.00 278.33 1,117,280.31
5011+480.00 0.00 24.02 0.00 41.81 10.00 0.00 0.00 418.09 1,116,862.22
5011+500.00 0.00 24.32 0.00 48.34 10.00 0.00 0.00 483.39 1,116,378.83
5011+520.00 0.00 24.51 0.00 48.83 10.00 0.00 0.00 488.27 1,115,890.56
5011+540.00 0.00 25.28 0.00 49.78 10.00 0.00 0.00 497.82 1,115,392.74
5011+560.00 0.00 24.86 0.00 50.14 10.00 0.00 0.00 501.35 1,114,891.39
5011+580.00 0.00 19.06 0.00 43.92 10.00 0.00 0.00 439.17 1,114,452.22
5011+600.00 0.00 21.01 0.00 40.07 10.00 0.00 0.00 400.65 1,114,051.57
5011+620.00 0.00 22.08 0.00 43.09 10.00 0.00 0.00 430.90 1,113,620.67
5011+640.00 0.00 23.68 0.00 45.77 10.00 0.00 0.00 457.66 1,113,163.01
205
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5011+660.00 0.00 28.71 0.00 52.39 10.00 0.00 0.00 523.93 1,112,639.08
5011+680.00 0.00 23.67 0.00 52.38 10.00 0.00 0.00 523.75 1,112,115.33
5011+700.00 0.00 23.34 0.00 47.01 10.00 0.00 0.00 470.06 1,111,645.27
5011+720.00 0.00 22.57 0.00 45.91 10.00 0.00 0.00 459.10 1,111,186.17
5011+740.00 0.00 30.83 0.00 53.40 10.00 0.00 0.00 534.04 1,110,652.13
5011+760.00 0.00 31.62 0.00 62.46 10.00 0.00 0.00 624.56 1,110,027.57
5011+780.00 0.00 34.22 0.00 65.84 10.00 0.00 0.00 658.38 1,109,369.19
5011+800.00 0.00 43.55 0.00 77.76 10.00 0.00 0.00 777.64 1,108,591.55
5011+820.00 0.00 44.95 0.00 88.49 10.00 0.00 0.00 884.93 1,107,706.62
5011+840.00 0.00 49.64 0.00 94.58 10.00 0.00 0.00 945.81 1,106,760.81
5011+860.00 0.00 52.41 0.00 102.05 10.00 0.00 0.00 1020.49 1,105,740.32
5011+880.00 0.00 48.31 0.00 100.72 10.00 0.00 0.00 1007.18 1,104,733.14
5011+900.00 0.00 52.36 0.00 100.67 10.00 0.00 0.00 1006.65 1,103,726.49
5011+920.00 0.00 51.62 0.00 103.98 10.00 0.00 0.00 1039.79 1,102,686.70
5011+940.00 0.00 46.65 0.00 98.26 10.00 0.00 0.00 982.64 1,101,704.06
5011+940.00 0.00 43.24 0.00 89.89 0.00 0.00 0.00 0.00 1,101,704.06
5011+960.00 0.00 40.89 0.00 84.13 10.00 0.00 0.00 841.27 1,100,862.79
5011+980.00 0.00 34.00 0.00 74.88 10.00 0.00 0.00 748.84 1,100,113.95
5012+000.00 0.00 39.19 0.00 73.19 10.00 0.00 0.00 731.87 1,099,382.08
5012+000.00 0.00 40.58 0.00 79.76 0.00 0.00 0.00 0.04 1,099,382.04
5012+020.00 0.00 34.96 0.00 75.53 10.00 0.00 0.00 755.30 1,098,626.73
5012+040.00 0.00 39.34 0.00 74.30 10.00 0.00 0.00 743.03 1,097,883.70
5012+060.00 0.00 36.30 0.00 75.65 10.00 0.00 0.00 756.48 1,097,127.22
5012+080.00 0.00 32.64 0.00 68.94 10.00 0.00 0.00 689.43 1,096,437.79
5012+100.00 0.00 34.39 0.00 67.03 10.00 0.00 0.00 670.32 1,095,767.47
5012+120.00 0.00 32.81 0.00 67.20 10.00 0.00 0.00 672.04 1,095,095.43
5012+140.00 0.00 32.80 0.00 65.61 10.00 0.00 0.00 656.10 1,094,439.33
5012+160.00 0.00 31.09 0.00 63.89 10.00 0.00 0.00 638.92 1,093,800.41
5012+180.00 0.00 32.07 0.00 63.16 10.00 0.00 0.00 631.64 1,093,168.77
5012+200.00 0.00 28.64 0.00 60.71 10.00 0.00 0.00 607.12 1,092,561.65
5012+220.00 0.00 25.01 0.00 53.65 10.00 0.00 0.00 536.49 1,092,025.16
5012+240.00 0.00 23.31 0.00 48.31 10.00 0.00 0.00 483.13 1,091,542.03
5012+260.00 0.00 21.10 0.00 44.40 10.00 0.00 0.00 444.02 1,091,098.01
5012+280.00 0.00 17.26 0.00 38.36 10.00 0.00 0.00 383.59 1,090,714.42
5012+300.00 0.00 15.40 0.00 32.66 10.00 0.00 0.00 326.57 1,090,387.85
5012+320.00 0.00 13.45 0.00 28.84 10.00 0.00 0.00 288.43 1,090,099.42
5012+340.00 0.00 11.61 0.00 25.06 10.00 0.00 0.00 250.57 1,089,848.85
5012+360.00 0.00 9.97 0.00 21.58 10.00 0.00 0.00 215.79 1,089,633.06
5012+380.00 0.00 10.16 0.00 20.13 10.00 0.00 0.00 201.32 1,089,431.74
5012+400.00 0.00 9.36 0.00 19.52 10.00 0.00 0.00 195.18 1,089,236.56
5012+420.00 0.00 8.49 0.00 17.84 10.00 0.00 0.00 178.42 1,089,058.14
5012+420.00 0.00 8.49 0.00 16.97 0.00 0.00 0.00 0.00 1,089,058.14
5012+440.00 0.00 7.93 0.00 16.42 10.00 0.00 0.00 164.19 1,088,893.95
5012+460.00 0.00 6.21 0.00 14.14 10.00 0.00 0.00 141.40 1,088,752.55
5012+480.00 0.03 5.55 0.03 11.76 10.00 0.25 0.33 117.60 1,088,635.28
206
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5012+500.00 0.00 5.74 0.03 11.29 10.00 0.25 0.33 112.94 1,088,522.66
5012+520.00 0.00 6.76 0.00 12.50 10.00 0.00 0.00 125.04 1,088,397.62
5012+540.00 0.00 6.32 0.00 13.08 10.00 0.00 0.00 130.78 1,088,266.84
5012+560.00 0.00 7.22 0.00 13.54 10.00 0.00 0.00 135.39 1,088,131.45
5012+580.00 0.00 6.40 0.00 13.62 10.00 0.00 0.00 136.24 1,087,995.21
5012+600.00 0.00 6.53 0.00 12.93 10.00 0.00 0.00 129.28 1,087,865.93
5012+600.00 0.00 5.87 0.00 12.40 0.00 0.00 0.00 0.00 1,087,865.93
5012+620.00 0.00 5.49 0.00 11.36 10.00 0.00 0.00 113.60 1,087,752.33
5012+640.00 0.00 5.73 0.00 11.22 10.00 0.00 0.00 112.22 1,087,640.11
5012+660.00 0.00 8.71 0.00 14.44 10.00 0.00 0.00 144.43 1,087,495.68
5012+680.00 0.00 9.84 0.00 18.55 10.00 0.00 0.00 185.52 1,087,310.16
5012+700.00 0.00 9.73 0.00 19.57 10.00 0.00 0.00 195.71 1,087,114.45
5012+720.00 0.00 5.41 0.00 15.15 10.00 0.00 0.00 151.45 1,086,963.00
5012+740.00 1.25 3.75 1.25 9.16 10.00 12.46 16.20 91.60 1,086,887.60
5012+760.00 0.78 4.96 2.03 8.71 10.00 20.28 26.36 87.06 1,086,826.91
5012+780.00 0.00 4.87 0.78 9.82 10.00 7.82 10.17 98.24 1,086,738.83
5012+800.00 0.00 8.16 0.00 13.03 10.00 0.00 0.00 130.29 1,086,608.54
5012+820.00 0.00 10.43 0.00 18.59 10.00 0.00 0.00 185.91 1,086,422.63
5012+840.00 0.00 10.22 0.00 20.65 10.00 0.00 0.00 206.45 1,086,216.18
5012+860.00 0.00 6.60 0.00 16.81 10.00 0.00 0.00 168.13 1,086,048.05
5012+880.00 0.00 9.06 0.00 15.65 10.00 0.00 0.00 156.54 1,085,891.51
5012+900.00 0.00 10.30 0.00 19.36 10.00 0.00 0.00 193.57 1,085,697.94
5012+920.00 0.00 11.54 0.00 21.84 10.00 0.00 0.00 218.38 1,085,479.56
5012+940.00 0.00 13.58 0.00 25.12 10.00 0.00 0.00 251.18 1,085,228.38
5012+960.00 0.00 12.57 0.00 26.15 10.00 0.00 0.00 261.48 1,084,966.90
5012+980.00 0.00 13.19 0.00 25.76 10.00 0.00 0.00 257.57 1,084,709.33
5013+000.00 0.00 15.50 0.00 28.69 10.00 0.00 0.00 286.89 1,084,422.44
5013+020.00 0.00 12.51 0.00 28.01 10.00 0.00 0.00 280.07 1,084,142.37
5013+040.00 0.00 12.64 0.00 25.15 10.00 0.00 0.00 251.45 1,083,890.92
5013+060.00 0.00 13.13 0.00 25.77 10.00 0.00 0.00 257.66 1,083,633.26
5013+080.00 0.00 21.30 0.00 34.43 10.00 0.00 0.00 344.27 1,083,288.99
5013+100.00 0.00 19.20 0.00 40.50 10.00 0.00 0.00 404.97 1,082,884.02
5013+120.00 0.00 22.61 0.00 41.80 10.00 0.00 0.00 418.02 1,082,466.00
5013+140.00 0.00 20.59 0.00 43.20 10.00 0.00 0.00 431.98 1,082,034.02
5013+160.00 0.00 21.55 0.00 42.14 10.00 0.00 0.00 421.42 1,081,612.60
5013+180.00 0.00 22.31 0.00 43.86 10.00 0.00 0.00 438.59 1,081,174.01
5013+200.00 0.00 23.84 0.00 46.15 10.00 0.00 0.00 461.46 1,080,712.55
5013+220.00 0.00 26.52 0.00 50.36 10.00 0.00 0.00 503.57 1,080,208.98
5013+235.00 0.00 27.61 0.00 54.13 7.50 0.00 0.00 405.98 1,079,803.00
5013+235.00 0.00 30.47 0.00 58.08 0.00 0.00 0.00 0.00 1,079,803.00
5013+240.00 0.00 30.54 0.00 61.01 2.50 0.00 0.00 152.53 1,079,650.47
5013+260.00 0.00 26.90 0.00 57.45 10.00 0.00 0.00 574.45 1,079,076.02
5013+280.00 0.00 34.94 0.00 61.84 10.00 0.00 0.00 618.43 1,078,457.59
5013+300.00 0.00 32.44 0.00 67.38 10.00 0.00 0.00 673.80 1,077,783.79
5013+320.00 0.00 33.22 0.00 65.66 10.00 0.00 0.00 656.62 1,077,127.17
207
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5013+340.00 0.00 29.75 0.00 62.98 10.00 0.00 0.00 629.76 1,076,497.41
5013+360.00 0.00 26.01 0.00 55.77 10.00 0.00 0.00 557.66 1,075,939.75
5013+380.00 0.00 18.38 0.00 44.39 10.00 0.00 0.00 443.89 1,075,495.86
5013+390.00 0.00 16.78 0.00 35.16 5.00 0.00 0.00 175.78 1,075,320.09
5013+390.00 0.00 15.25 0.00 32.03 0.00 0.00 0.00 0.00 1,075,320.09
5013+400.00 0.00 13.82 0.00 29.07 5.00 0.00 0.00 145.36 1,075,174.73
5013+420.00 0.00 13.52 0.00 27.34 10.00 0.00 0.00 273.38 1,074,901.35
5013+440.00 0.00 12.92 0.00 26.44 10.00 0.00 0.00 264.35 1,074,637.00
5013+460.00 0.00 15.71 0.00 28.63 10.00 0.00 0.00 286.29 1,074,350.71
5013+480.00 0.00 19.29 0.00 35.00 10.00 0.00 0.00 350.00 1,074,000.71
5013+500.00 0.00 12.72 0.00 32.01 10.00 0.00 0.00 320.05 1,073,680.66
5013+520.00 0.00 11.50 0.00 24.22 10.00 0.00 0.00 242.22 1,073,438.44
5013+540.00 0.00 8.42 0.00 19.93 10.00 0.00 0.00 199.28 1,073,239.16
5013+560.00 0.00 7.46 0.00 15.89 10.00 0.00 0.00 158.86 1,073,080.30
5013+580.00 0.00 6.71 0.00 14.17 10.00 0.00 0.00 141.72 1,072,938.58
5013+600.00 0.00 6.04 0.00 12.75 10.00 0.00 0.00 127.54 1,072,811.04
5013+620.00 0.00 5.18 0.00 11.22 10.00 0.00 0.00 112.22 1,072,698.82
5013+640.00 0.00 4.08 0.00 9.26 10.00 0.00 0.00 92.60 1,072,606.22
5013+660.00 0.00 6.61 0.00 10.69 10.00 0.00 0.00 106.92 1,072,499.30
5013+680.00 0.00 6.53 0.00 13.14 10.00 0.00 0.00 131.39 1,072,367.91
5013+700.00 0.00 4.29 0.00 10.82 10.00 0.00 0.00 108.22 1,072,259.69
5013+720.00 0.00 7.63 0.00 11.92 10.00 0.00 0.00 119.18 1,072,140.51
5013+740.00 0.00 5.14 0.00 12.76 10.00 0.00 0.00 127.62 1,072,012.89
5013+760.00 1.16 3.09 1.16 8.22 10.00 11.62 15.11 82.23 1,071,945.77
5013+780.00 1.42 4.64 2.59 7.73 10.00 25.85 33.61 77.30 1,071,902.07
5013+800.00 2.81 4.36 4.24 9.00 10.00 42.37 55.08 90.01 1,071,867.14
5013+820.00 0.00 5.04 2.81 9.40 10.00 28.14 36.58 93.98 1,071,809.74
5013+840.00 0.82 6.45 0.82 11.49 10.00 8.22 10.69 114.94 1,071,705.49
5013+860.00 0.00 6.64 0.82 13.09 10.00 8.22 10.69 130.90 1,071,585.28
5013+880.00 0.00 8.35 0.00 14.98 10.00 0.00 0.00 149.84 1,071,435.44
5013+900.00 0.00 11.44 0.00 19.79 10.00 0.00 0.00 197.85 1,071,237.59
5013+920.00 0.00 10.12 0.00 21.55 10.00 0.00 0.00 215.54 1,071,022.05
5013+940.00 0.00 8.25 0.00 18.37 10.00 0.00 0.00 183.68 1,070,838.37
5013+960.00 0.00 10.79 0.00 19.04 10.00 0.00 0.00 190.39 1,070,647.98
5013+980.00 0.00 16.81 0.00 27.60 10.00 0.00 0.00 276.01 1,070,371.97
5014+000.00 0.00 20.61 0.00 37.43 10.00 0.00 0.00 374.26 1,069,997.71
5014+020.00 0.00 25.84 0.00 46.45 10.00 0.00 0.00 464.47 1,069,533.24
5014+040.00 0.00 29.91 0.00 55.75 10.00 0.00 0.00 557.46 1,068,975.78
5014+060.00 0.00 33.33 0.00 63.24 10.00 0.00 0.00 632.44 1,068,343.34
5014+060.00 0.00 36.50 0.00 69.83 0.00 0.00 0.00 0.00 1,068,343.34
5014+080.00 0.00 34.84 0.00 71.34 10.00 0.00 0.00 713.35 1,067,629.99
5014+100.00 0.00 35.69 0.00 70.53 10.00 0.00 0.00 705.27 1,066,924.72
5014+120.00 0.00 29.42 0.00 65.11 10.00 0.00 0.00 651.09 1,066,273.63
5014+140.00 0.00 31.00 0.00 60.42 10.00 0.00 0.00 604.22 1,065,669.41
5014+160.00 0.00 26.03 0.00 57.03 10.00 0.00 0.00 570.33 1,065,099.08
208
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5014+180.00 0.00 19.18 0.00 45.21 10.00 0.00 0.00 452.06 1,064,647.02
5014+200.00 0.00 17.86 0.00 37.04 10.00 0.00 0.00 370.36 1,064,276.66
5014+220.00 0.00 12.34 0.00 30.20 10.00 0.00 0.00 301.96 1,063,974.70
5014+240.00 0.00 10.30 0.00 22.63 10.00 0.00 0.00 226.34 1,063,748.36
5014+260.00 0.00 11.50 0.00 21.79 10.00 0.00 0.00 217.92 1,063,530.44
5014+280.00 0.00 11.04 0.00 22.54 10.00 0.00 0.00 225.39 1,063,305.05
5014+300.00 0.00 11.01 0.00 22.05 10.00 0.00 0.00 220.51 1,063,084.54
5014+320.00 0.68 7.15 0.68 18.16 10.00 6.83 8.88 181.58 1,062,911.83
5014+340.00 0.38 6.44 1.06 13.59 10.00 10.63 13.82 135.93 1,062,789.72
5014+360.00 1.91 4.46 2.29 10.90 10.00 22.87 29.73 109.01 1,062,710.44
5014+380.00 0.00 6.52 1.91 10.98 10.00 19.07 24.79 109.78 1,062,625.46
5014+400.00 0.00 5.92 0.00 12.44 10.00 0.00 0.00 124.42 1,062,501.04
5014+420.00 0.00 5.67 0.00 11.59 10.00 0.00 0.00 115.88 1,062,385.16
5014+440.00 0.00 5.23 0.00 10.89 10.00 0.00 0.00 108.90 1,062,276.26
5014+460.00 0.00 8.17 0.00 13.40 10.00 0.00 0.00 133.97 1,062,142.29
5014+480.00 0.00 10.18 0.00 18.35 10.00 0.00 0.00 183.51 1,061,958.78
5014+500.00 0.00 8.68 0.00 18.86 10.00 0.00 0.00 188.56 1,061,770.22
5014+520.00 0.00 10.57 0.00 19.25 10.00 0.00 0.00 192.50 1,061,577.72
5014+540.00 0.00 10.49 0.00 21.06 10.00 0.00 0.00 210.64 1,061,367.08
5014+560.00 0.00 12.08 0.00 22.57 10.00 0.00 0.00 225.74 1,061,141.34
5014+580.00 0.00 11.99 0.00 24.07 10.00 0.00 0.00 240.74 1,060,900.60
5014+600.00 0.00 13.08 0.00 25.07 10.00 0.00 0.00 250.71 1,060,649.89
5014+620.00 0.00 12.83 0.00 25.91 10.00 0.00 0.00 259.08 1,060,390.81
5014+640.00 0.00 14.00 0.00 26.83 10.00 0.00 0.00 268.30 1,060,122.51
5014+660.00 0.00 16.45 0.00 30.45 10.00 0.00 0.00 304.54 1,059,817.97
5014+680.00 0.00 20.74 0.00 37.19 10.00 0.00 0.00 371.89 1,059,446.08
5014+700.00 0.00 20.82 0.00 41.56 10.00 0.00 0.00 415.59 1,059,030.49
5014+720.00 0.00 19.24 0.00 40.07 10.00 0.00 0.00 400.65 1,058,629.84
5014+740.00 0.00 20.39 0.00 39.63 10.00 0.00 0.00 396.34 1,058,233.50
5014+760.00 0.00 19.93 0.00 40.32 10.00 0.00 0.00 403.18 1,057,830.32
5014+780.00 0.00 24.99 0.00 44.92 10.00 0.00 0.00 449.20 1,057,381.12
5014+800.00 0.00 28.02 0.00 53.02 10.00 0.00 0.00 530.15 1,056,850.97
5014+820.00 0.00 26.68 0.00 54.70 10.00 0.00 0.00 547.04 1,056,303.93
5014+840.00 0.00 27.95 0.00 54.63 10.00 0.00 0.00 546.31 1,055,757.62
5014+860.00 0.00 27.52 0.00 55.47 10.00 0.00 0.00 554.72 1,055,202.90
5014+880.00 0.00 31.78 0.00 59.30 10.00 0.00 0.00 593.01 1,054,609.89
5014+900.00 0.00 32.01 0.00 63.79 10.00 0.00 0.00 637.92 1,053,971.97
5014+920.00 0.00 24.33 0.00 56.34 10.00 0.00 0.00 563.40 1,053,408.57
5014+940.00 0.00 36.10 0.00 60.42 10.00 0.00 0.00 604.23 1,052,804.34
5014+960.00 0.00 36.35 0.00 72.44 10.00 0.00 0.00 724.42 1,052,079.92
5014+980.00 0.00 37.97 0.00 74.31 10.00 0.00 0.00 743.12 1,051,336.80
5015+000.00 0.00 38.24 0.00 76.20 10.00 0.00 0.00 762.02 1,050,574.78
5015+020.00 0.00 34.26 0.00 72.50 10.00 0.00 0.00 724.97 1,049,849.81
5015+040.00 0.00 27.50 0.00 61.77 10.00 0.00 0.00 617.65 1,049,232.16
5015+060.00 0.00 22.98 0.00 50.48 10.00 0.00 0.00 504.82 1,048,727.34
209
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5015+080.00 0.00 25.35 0.00 48.33 10.00 0.00 0.00 483.32 1,048,244.02
5015+100.00 0.00 19.99 0.00 45.35 10.00 0.00 0.00 453.46 1,047,790.56
5015+120.00 0.00 12.72 0.00 32.72 10.00 0.00 0.00 327.16 1,047,463.40
5015+140.00 0.00 13.97 0.00 26.69 10.00 0.00 0.00 266.90 1,047,196.50
5015+160.00 0.00 13.31 0.00 27.27 10.00 0.00 0.00 272.74 1,046,923.76
5015+180.00 0.00 12.14 0.00 25.45 10.00 0.00 0.00 254.50 1,046,669.26
5015+200.00 0.00 9.69 0.00 21.83 10.00 0.00 0.00 218.32 1,046,450.94
5015+220.00 0.00 8.92 0.00 18.61 10.00 0.00 0.00 186.05 1,046,264.89
5015+240.00 0.00 6.65 0.00 15.57 10.00 0.00 0.00 155.68 1,046,109.21
5015+260.00 0.43 3.35 0.43 10.00 10.00 4.31 5.60 99.99 1,046,014.82
5015+280.00 0.00 6.73 0.43 10.08 10.00 4.31 5.60 100.79 1,045,919.63
5015+300.00 0.00 6.85 0.00 13.58 10.00 0.00 0.00 135.79 1,045,783.84
5015+320.00 0.52 6.22 0.52 13.07 10.00 5.15 6.70 130.69 1,045,659.85
5015+340.00 0.45 6.62 0.97 12.84 10.00 9.68 12.58 128.39 1,045,544.04
5015+360.00 0.00 8.47 0.45 15.09 10.00 4.53 5.89 150.91 1,045,399.02
5015+380.00 0.00 14.18 0.00 22.65 10.00 0.00 0.00 226.50 1,045,172.52
5015+400.00 0.00 17.97 0.00 32.14 10.00 0.00 0.00 321.41 1,044,851.11
5015+420.00 0.00 20.36 0.00 38.32 10.00 0.00 0.00 383.22 1,044,467.89
5015+440.00 0.00 12.68 0.00 33.04 10.00 0.00 0.00 330.37 1,044,137.52
5015+460.00 0.00 15.89 0.00 28.57 10.00 0.00 0.00 285.67 1,043,851.85
5015+480.00 0.00 20.28 0.00 36.17 10.00 0.00 0.00 361.68 1,043,490.17
5015+500.00 0.00 19.97 0.00 40.26 10.00 0.00 0.00 402.55 1,043,087.62
5015+520.00 0.00 23.90 0.00 43.88 10.00 0.00 0.00 438.77 1,042,648.85
5015+540.00 0.00 29.72 0.00 53.63 10.00 0.00 0.00 536.25 1,042,112.60
5015+560.00 0.00 35.42 0.00 65.14 10.00 0.00 0.00 651.38 1,041,461.22
5015+580.00 0.00 39.46 0.00 74.88 10.00 0.00 0.00 748.79 1,040,712.43
5015+600.00 0.00 31.31 0.00 70.77 10.00 0.00 0.00 707.72 1,040,004.71
5015+620.00 0.00 30.30 0.00 61.60 10.00 0.00 0.00 616.04 1,039,388.67
5015+640.00 0.00 30.45 0.00 60.74 10.00 0.00 0.00 607.42 1,038,781.25
5015+660.00 0.00 32.75 0.00 63.20 10.00 0.00 0.00 631.95 1,038,149.30
5015+680.00 0.00 35.92 0.00 68.66 10.00 0.00 0.00 686.63 1,037,462.67
5015+700.00 0.00 33.61 0.00 69.52 10.00 0.00 0.00 695.24 1,036,767.43
5015+720.00 0.00 35.99 0.00 69.60 10.00 0.00 0.00 695.96 1,036,071.47
5015+740.00 0.00 27.33 0.00 63.32 10.00 0.00 0.00 633.17 1,035,438.30
5015+760.00 0.00 26.75 0.00 54.08 10.00 0.00 0.00 540.82 1,034,897.48
5015+780.00 0.00 30.57 0.00 57.33 10.00 0.00 0.00 573.25 1,034,324.23
5015+800.00 0.00 29.94 0.00 60.52 10.00 0.00 0.00 605.15 1,033,719.08
5015+820.00 0.00 30.83 0.00 60.77 10.00 0.00 0.00 607.67 1,033,111.41
5015+830.00 0.00 27.61 0.00 58.44 5.00 0.00 0.00 292.20 1,032,819.21
5015+830.00 0.00 27.95 0.00 55.57 0.00 0.00 0.00 0.00 1,032,819.21
5015+840.00 0.00 24.82 0.00 52.78 5.00 0.00 0.00 263.89 1,032,555.33
5015+860.00 0.00 29.59 0.00 54.41 10.00 0.00 0.00 544.12 1,032,011.21
5015+880.00 0.00 33.49 0.00 63.08 10.00 0.00 0.00 630.82 1,031,380.39
5015+900.00 0.00 36.89 0.00 70.38 10.00 0.00 0.00 703.79 1,030,676.60
5015+920.00 0.00 26.38 0.00 63.26 10.00 0.00 0.00 632.61 1,030,043.99
210
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5015+940.00 0.00 27.03 0.00 53.40 10.00 0.00 0.00 534.01 1,029,509.98
5015+960.00 0.00 27.36 0.00 54.38 10.00 0.00 0.00 543.81 1,028,966.17
5015+980.00 0.00 30.36 0.00 57.72 10.00 0.00 0.00 577.19 1,028,388.98
5016+000.00 0.00 23.53 0.00 53.90 10.00 0.00 0.00 538.97 1,027,850.01
5016+020.00 0.00 27.27 0.00 50.80 10.00 0.00 0.00 508.00 1,027,342.01
5016+040.00 0.00 24.93 0.00 52.20 10.00 0.00 0.00 522.00 1,026,820.01
5016+060.00 0.00 22.65 0.00 47.59 10.00 0.00 0.00 475.87 1,026,344.14
5016+080.00 0.00 18.40 0.00 41.06 10.00 0.00 0.00 410.58 1,025,933.56
5016+100.00 0.00 15.88 0.00 34.28 10.00 0.00 0.00 342.80 1,025,590.76
5016+120.00 0.00 16.70 0.00 32.57 10.00 0.00 0.00 325.72 1,025,265.04
5016+140.00 0.00 19.22 0.00 35.91 10.00 0.00 0.00 359.11 1,024,905.93
5016+160.00 0.00 17.90 0.00 37.12 10.00 0.00 0.00 371.15 1,024,534.78
5016+180.00 0.00 24.25 0.00 42.15 10.00 0.00 0.00 421.49 1,024,113.29
5016+200.00 0.00 25.44 0.00 49.69 10.00 0.00 0.00 496.85 1,023,616.44
5016+220.00 0.00 25.55 0.00 50.98 10.00 0.00 0.00 509.84 1,023,106.60
5016+240.00 0.00 27.34 0.00 52.89 10.00 0.00 0.00 528.91 1,022,577.69
5016+260.00 0.00 33.75 0.00 61.09 10.00 0.00 0.00 610.93 1,021,966.76
5016+280.00 0.00 33.81 0.00 67.56 10.00 0.00 0.00 675.64 1,021,291.12
5016+300.00 0.00 25.16 0.00 58.97 10.00 0.00 0.00 589.72 1,020,701.40
5016+320.00 0.00 31.76 0.00 56.91 10.00 0.00 0.00 569.13 1,020,132.27
5016+340.00 0.00 28.66 0.00 60.41 10.00 0.00 0.00 604.14 1,019,528.13
5016+360.00 0.00 34.67 0.00 63.32 10.00 0.00 0.00 633.24 1,018,894.89
5016+380.00 0.00 35.75 0.00 70.41 10.00 0.00 0.00 704.12 1,018,190.77
5016+400.00 0.00 34.93 0.00 70.67 10.00 0.00 0.00 706.73 1,017,484.04
5016+420.00 0.00 32.75 0.00 67.68 10.00 0.00 0.00 676.77 1,016,807.27
5016+440.00 0.00 31.98 0.00 64.73 10.00 0.00 0.00 647.33 1,016,159.94
5016+460.00 0.00 29.15 0.00 61.13 10.00 0.00 0.00 611.27 1,015,548.67
5016+480.00 0.00 30.30 0.00 59.44 10.00 0.00 0.00 594.44 1,014,954.23
5016+500.00 0.00 38.18 0.00 68.48 10.00 0.00 0.00 684.80 1,014,269.43
5016+520.00 0.00 37.65 0.00 75.83 10.00 0.00 0.00 758.34 1,013,511.09
5016+520.00 0.00 35.97 0.00 73.62 0.00 0.00 0.00 0.00 1,013,511.09
5016+540.00 0.00 37.69 0.00 73.66 10.00 0.00 0.00 736.57 1,012,774.52
5016+560.00 0.00 37.13 0.00 74.82 10.00 0.00 0.00 748.21 1,012,026.31
5016+580.00 0.00 40.16 0.00 77.29 10.00 0.00 0.00 772.88 1,011,253.43
5016+600.00 0.00 35.80 0.00 75.96 10.00 0.00 0.00 759.60 1,010,493.83
5016+600.00 0.00 35.80 0.00 71.61 0.00 0.00 0.00 0.00 1,010,493.83
5016+620.00 0.00 27.33 0.00 63.14 10.00 0.00 0.00 631.38 1,009,862.45
5016+640.00 0.00 25.89 0.00 53.22 10.00 0.00 0.00 532.22 1,009,330.23
5016+660.00 0.00 26.39 0.00 52.28 10.00 0.00 0.00 522.78 1,008,807.45
5016+680.00 0.00 25.31 0.00 51.70 10.00 0.00 0.00 517.00 1,008,290.45
5016+700.00 0.00 26.15 0.00 51.46 10.00 0.00 0.00 514.61 1,007,775.84
5016+720.00 0.00 18.36 0.00 44.51 10.00 0.00 0.00 445.14 1,007,330.70
5016+740.00 0.00 11.39 0.00 29.75 10.00 0.00 0.00 297.54 1,007,033.16
5016+760.00 0.00 9.90 0.00 21.29 10.00 0.00 0.00 212.91 1,006,820.25
5016+780.00 5.80 6.10 5.80 16.00 10.00 57.97 75.36 160.04 1,006,735.57
211
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5016+800.00 7.68 6.86 13.47 12.96 10.00 134.74 175.16 129.60 1,006,781.13
5016+820.00 7.54 7.14 15.21 14.00 10.00 152.13 197.77 139.95 1,006,838.95
5016+840.00 7.56 7.29 15.10 14.43 10.00 150.99 196.29 144.27 1,006,890.97
5016+860.00 8.79 7.92 16.35 15.21 10.00 163.51 212.56 152.09 1,006,951.44
5016+880.00 1.09 10.94 9.88 18.86 10.00 98.78 128.41 188.58 1,006,891.28
5016+900.00 0.00 13.69 1.09 24.62 10.00 10.90 14.17 246.23 1,006,659.22
5016+920.00 0.00 20.98 0.00 34.67 10.00 0.00 0.00 346.66 1,006,312.56
5016+940.00 0.00 25.03 0.00 46.01 10.00 0.00 0.00 460.06 1,005,852.50
5016+960.00 0.00 33.21 0.00 58.23 10.00 0.00 0.00 582.31 1,005,270.19
5016+980.00 0.00 36.24 0.00 69.45 10.00 0.00 0.00 694.46 1,004,575.73
5017+000.00 0.00 38.29 0.00 74.53 10.00 0.00 0.00 745.31 1,003,830.42
5017+020.00 0.00 31.52 0.00 69.81 10.00 0.00 0.00 698.14 1,003,132.28
5017+040.00 0.00 30.52 0.00 62.04 10.00 0.00 0.00 620.43 1,002,511.85
5017+060.00 0.00 31.02 0.00 61.54 10.00 0.00 0.00 615.36 1,001,896.49
5017+080.00 0.00 29.33 0.00 60.35 10.00 0.00 0.00 603.46 1,001,293.03
5017+100.00 0.00 23.57 0.00 52.90 10.00 0.00 0.00 528.97 1,000,764.06
5017+120.00 0.00 21.90 0.00 45.46 10.00 0.00 0.00 454.64 1,000,309.42
5017+140.00 0.00 15.77 0.00 37.67 10.00 0.00 0.00 376.68 999,932.74
5017+160.00 0.00 13.03 0.00 28.81 10.00 0.00 0.00 288.06 999,644.68
5017+180.00 1.93 9.84 1.93 22.87 10.00 19.32 25.12 228.73 999,441.06
5017+200.00 2.84 11.32 4.78 21.16 10.00 47.76 62.09 211.60 999,291.55
5017+220.00 0.79 12.26 3.64 23.58 10.00 36.37 47.28 235.80 999,103.03
5017+240.00 1.22 10.87 2.02 23.12 10.00 20.15 26.20 231.24 998,897.99
5017+260.00 2.91 10.87 4.13 21.73 10.00 41.28 53.66 217.34 998,734.31
5017+280.00 5.38 9.00 8.29 19.87 10.00 82.85 107.71 198.73 998,643.28
5017+300.00 10.67 7.74 16.05 16.75 10.00 160.49 208.64 167.45 998,684.47
5017+320.00 7.26 8.36 17.93 16.10 10.00 179.31 233.10 160.99 998,756.58
5017+340.00 2.34 9.72 9.60 18.08 10.00 96.02 124.83 180.81 998,700.60
5017+340.00 1.90 11.11 4.25 20.83 0.00 0.00 0.00 0.00 998,700.60
5017+360.00 1.41 10.27 3.32 21.38 10.00 33.18 43.13 213.75 998,529.98
5017+380.00 0.00 12.51 1.41 22.78 10.00 14.14 18.38 227.83 998,320.54
5017+400.00 0.00 13.84 0.00 26.36 10.00 0.00 0.00 263.55 998,056.99
5017+420.00 0.00 12.23 0.00 26.07 10.00 0.00 0.00 260.66 997,796.33
5017+440.00 0.00 10.68 0.00 22.90 10.00 0.00 0.00 229.01 997,567.32
5017+460.00 3.36 9.69 3.36 20.37 10.00 33.63 43.72 203.69 997,407.35
5017+480.00 1.75 12.76 5.12 22.45 10.00 51.17 66.52 224.51 997,249.36
5017+500.00 0.00 19.40 1.75 32.16 10.00 17.54 22.80 321.60 996,950.56
5017+520.00 0.00 26.26 0.00 45.66 10.00 0.00 0.00 456.58 996,493.98
5017+540.00 0.00 25.56 0.00 51.82 10.00 0.00 0.00 518.16 995,975.82
5017+560.00 0.00 30.85 0.00 56.41 10.00 0.00 0.00 564.08 995,411.74
5017+563.95 0.00 30.63 0.00 61.48 1.97 0.00 0.00 121.27 995,290.47
5017+580.00 0.00 29.63 0.00 60.26 8.03 0.00 0.00 483.74 994,806.73
5017+593.95 0.00 30.11 0.00 59.74 6.97 0.00 0.00 416.52 994,390.21
5017+600.00 0.00 30.19 0.00 60.30 3.03 0.00 0.00 182.56 994,207.64
5017+620.00 0.00 28.74 0.00 58.93 10.00 0.00 0.00 589.27 993,618.37
212
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5017+640.00 0.00 26.77 0.00 55.51 10.00 0.00 0.00 555.10 993,063.27
5017+660.00 0.00 22.89 0.00 49.66 10.00 0.00 0.00 496.59 992,566.68
5017+678.40 0.00 22.88 0.00 45.77 9.20 0.00 0.00 421.06 992,145.62
5017+680.00 0.00 22.74 0.00 45.62 0.80 0.00 0.00 36.49 992,109.13
5017+680.00 0.00 22.74 0.00 45.47 0.00 0.00 0.00 0.00 992,109.13
5017+700.00 0.00 15.02 0.00 37.75 10.00 0.00 0.00 377.53 991,731.60
5017+708.40 0.00 13.49 0.00 28.51 4.20 0.00 0.00 119.73 991,611.87
5017+720.00 0.00 12.08 0.00 25.57 5.80 0.00 0.00 148.32 991,463.55
5017+740.00 0.00 13.20 0.00 25.28 10.00 0.00 0.00 252.83 991,210.72
5017+760.00 0.00 12.49 0.00 25.69 10.00 0.00 0.00 256.91 990,953.81
5017+780.00 0.00 13.49 0.00 25.98 10.00 0.00 0.00 259.79 990,694.02
5017+800.00 0.00 21.34 0.00 34.83 10.00 0.00 0.00 348.33 990,345.69
5017+820.00 0.00 21.64 0.00 42.98 10.00 0.00 0.00 429.81 989,915.88
5017+840.00 0.00 20.29 0.00 41.93 10.00 0.00 0.00 419.28 989,496.60
5017+860.00 0.00 14.22 0.00 34.51 10.00 0.00 0.00 345.12 989,151.48
5017+880.00 0.00 17.48 0.00 31.70 10.00 0.00 0.00 317.01 988,834.47
5017+900.00 0.00 20.96 0.00 38.44 10.00 0.00 0.00 384.38 988,450.09
5017+920.00 0.00 24.30 0.00 45.26 10.00 0.00 0.00 452.58 987,997.51
5017+940.00 0.00 27.07 0.00 51.36 10.00 0.00 0.00 513.64 987,483.87
5017+960.00 0.00 24.19 0.00 51.25 10.00 0.00 0.00 512.54 986,971.33
5017+980.00 0.00 28.21 0.00 52.40 10.00 0.00 0.00 523.99 986,447.34
5018+000.00 0.00 28.14 0.00 56.35 10.00 0.00 0.00 563.46 985,883.88
5018+020.00 0.00 34.18 0.00 62.31 10.00 0.00 0.00 623.13 985,260.75
5018+040.00 0.00 37.78 0.00 71.95 10.00 0.00 0.00 719.53 984,541.22
5018+040.00 0.00 36.14 0.00 73.91 0.00 0.00 0.00 0.00 984,541.22
5018+060.00 0.00 29.68 0.00 65.82 10.00 0.00 0.00 658.15 983,883.07
5018+080.00 0.00 29.09 0.00 58.77 10.00 0.00 0.00 587.70 983,295.37
5018+100.00 0.00 30.87 0.00 59.96 10.00 0.00 0.00 599.63 982,695.74
5018+120.00 0.00 30.81 0.00 61.68 10.00 0.00 0.00 616.83 982,078.91
5018+140.00 0.00 27.30 0.00 58.12 10.00 0.00 0.00 581.16 981,497.75
5018+160.00 0.00 28.05 0.00 55.36 10.00 0.00 0.00 553.57 980,944.18
5018+180.00 0.00 27.96 0.00 56.01 10.00 0.00 0.00 560.13 980,384.05
5018+200.00 0.00 23.34 0.00 51.30 10.00 0.00 0.00 512.99 979,871.06
5018+220.00 0.00 22.97 0.00 46.31 10.00 0.00 0.00 463.12 979,407.94
5018+240.00 0.00 21.00 0.00 43.98 10.00 0.00 0.00 439.75 978,968.19
5018+260.00 0.00 16.87 0.00 37.87 10.00 0.00 0.00 378.68 978,589.51
5018+280.00 0.76 7.66 0.76 24.52 10.00 7.58 9.85 245.23 978,354.14
5018+300.00 0.55 5.15 1.31 12.81 10.00 13.09 17.02 128.10 978,243.05
5018+320.00 0.00 6.09 0.55 11.24 10.00 5.51 7.16 112.38 978,137.84
5018+340.00 0.00 11.58 0.00 17.67 10.00 0.00 0.00 176.70 977,961.14
5018+360.00 0.00 11.45 0.00 23.04 10.00 0.00 0.00 230.38 977,730.76
5018+380.00 0.00 10.80 0.00 22.25 10.00 0.00 0.00 222.50 977,508.26
5018+400.00 0.00 7.52 0.00 18.32 10.00 0.00 0.00 183.15 977,325.11
5018+420.00 0.00 6.95 0.00 14.46 10.00 0.00 0.00 144.64 977,180.47
5018+440.00 0.00 6.54 0.00 13.48 10.00 0.00 0.00 134.82 977,045.65
213
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5018+460.00 0.00 8.51 0.00 15.04 10.00 0.00 0.00 150.42 976,895.23
5018+480.00 0.00 9.07 0.00 17.57 10.00 0.00 0.00 175.71 976,719.52
5018+500.00 0.00 10.40 0.00 19.47 10.00 0.00 0.00 194.67 976,524.85
5018+520.00 0.00 10.36 0.00 20.76 10.00 0.00 0.00 207.62 976,317.23
5018+540.00 0.00 11.33 0.00 21.69 10.00 0.00 0.00 216.91 976,100.32
5018+560.00 0.00 13.25 0.00 24.58 10.00 0.00 0.00 245.79 975,854.53
5018+580.00 0.00 12.31 0.00 25.55 10.00 0.00 0.00 255.54 975,598.99
5018+600.00 0.00 7.20 0.00 19.50 10.00 0.00 0.00 195.01 975,403.98
5018+620.00 2.06 2.50 2.06 9.70 10.00 20.57 26.74 96.99 975,333.73
5018+640.00 1.30 2.29 3.36 4.80 10.00 33.55 43.62 47.96 975,329.38
5018+660.00 0.00 6.24 1.30 8.53 10.00 12.98 16.87 85.34 975,260.92
5018+680.00 0.00 6.50 0.00 12.74 10.00 0.00 0.00 127.41 975,133.51
5018+700.00 1.19 3.14 1.19 9.64 10.00 11.94 15.52 96.40 975,052.63
5018+720.00 9.01 1.08 10.20 4.22 10.00 101.99 132.59 42.16 975,143.06
5018+740.00 12.34 1.18 21.35 2.25 10.00 213.49 277.54 22.51 975,398.08
5018+760.00 2.00 2.52 14.34 3.69 10.00 143.39 186.41 36.93 975,547.56
5018+780.00 0.00 9.30 2.00 11.82 10.00 19.95 25.94 118.21 975,455.28
5018+800.00 0.00 9.54 0.00 18.85 10.00 0.00 0.00 188.47 975,266.81
5018+820.00 0.00 7.57 0.00 17.11 10.00 0.00 0.00 171.14 975,095.67
5018+840.00 0.00 10.34 0.00 17.91 10.00 0.00 0.00 179.13 974,916.54
5018+860.00 0.00 11.88 0.00 22.22 10.00 0.00 0.00 222.24 974,694.30
5018+880.00 0.00 12.66 0.00 24.54 10.00 0.00 0.00 245.40 974,448.90
5018+900.00 0.00 13.97 0.00 26.62 10.00 0.00 0.00 266.24 974,182.66
5018+920.00 0.00 15.79 0.00 29.75 10.00 0.00 0.00 297.52 973,885.14
5018+939.87 0.00 15.46 0.00 31.24 9.93 0.00 0.00 310.33 973,574.82
5018+940.00 0.00 15.46 0.00 30.91 0.07 0.00 0.00 2.07 973,572.75
5018+960.00 0.00 13.40 0.00 28.85 10.00 0.00 0.00 288.52 973,284.23
5018+979.87 0.00 12.67 0.00 26.07 9.93 0.00 0.00 258.95 973,025.27
5018+980.00 0.00 12.67 0.00 25.34 0.07 0.00 0.00 1.70 973,023.58
5019+000.00 0.00 8.77 0.00 21.43 10.00 0.00 0.00 214.31 972,809.27
5019+020.00 3.06 7.35 3.06 16.12 10.00 30.61 39.79 161.20 972,687.86
5019+040.00 10.31 7.39 13.37 14.75 10.00 133.67 173.77 147.48 972,714.15
5019+060.00 23.10 5.22 33.41 12.62 10.00 334.06 434.28 126.15 973,022.28
5019+062.97 21.30 5.39 44.40 10.61 1.48 65.86 85.62 15.74 973,092.17
5019+080.00 8.72 6.76 30.02 12.14 8.52 255.62 332.31 103.42 973,321.06
5019+100.00 18.48 7.52 27.20 14.27 10.00 271.99 353.59 142.72 973,531.93
5019+102.97 17.91 7.79 36.40 15.30 1.48 53.99 70.19 22.70 973,579.42
5019+120.00 12.69 9.36 30.60 17.14 8.52 260.60 338.78 146.01 973,772.18
5019+140.00 2.25 10.58 14.94 19.93 10.00 149.36 194.17 199.34 973,767.01
5019+160.00 1.57 13.24 3.82 23.82 10.00 38.20 49.66 238.23 973,578.44
5019+180.00 9.63 10.58 11.20 23.82 10.00 111.95 145.54 238.22 973,485.76
5019+200.00 1.86 16.41 11.49 26.99 10.00 114.89 149.36 269.88 973,365.23
5019+220.00 0.00 21.96 1.86 38.37 10.00 18.63 24.22 383.74 973,005.71
5019+240.00 0.53 18.06 0.53 40.02 10.00 5.25 6.83 400.24 972,612.30
5019+260.00 0.00 20.30 0.53 38.36 10.00 5.25 6.83 383.58 972,235.54
214
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5019+280.00 2.21 21.35 2.21 41.65 10.00 22.14 28.78 416.46 971,847.86
5019+300.00 0.00 23.47 2.21 44.82 10.00 22.14 28.78 448.19 971,428.46
5019+320.00 0.00 22.03 0.00 45.50 10.00 0.00 0.00 455.00 970,973.46
5019+340.00 0.00 27.41 0.00 49.44 10.00 0.00 0.00 494.42 970,479.04
5019+360.00 0.00 27.05 0.00 54.46 10.00 0.00 0.00 544.60 969,934.44
5019+380.00 0.00 27.33 0.00 54.38 10.00 0.00 0.00 543.78 969,390.66
5019+400.00 0.00 22.36 0.00 49.69 10.00 0.00 0.00 496.86 968,893.80
5019+420.00 8.41 15.42 8.41 37.77 10.00 84.07 109.29 377.72 968,625.37
5019+440.00 3.84 20.56 12.25 35.97 10.00 122.51 159.26 359.74 968,424.89
5019+450.00 0.00 23.51 3.84 44.07 5.00 19.22 24.99 220.35 968,229.53
5019+450.00 0.00 0.00 0.00 23.51 0.00 0.00 0.00 0.00 968,229.53
5019+450.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 968,229.53
5019+460.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 968,229.53
5019+478.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 968,229.53
5019+478.00 0.00 50.20 0.00 50.20 0.00 0.00 0.00 0.00 968,229.53
5019+478.00 0.00 43.91 0.00 94.11 0.00 0.00 0.00 0.05 968,229.48
5019+480.00 0.00 45.10 0.00 89.01 1.00 0.00 0.00 88.97 968,140.51
5019+500.00 0.00 70.27 0.00 115.37 10.00 0.00 0.00 1153.67 966,986.84
5019+520.00 0.00 75.55 0.00 145.81 10.00 0.00 0.00 1458.14 965,528.70
5019+540.00 0.00 73.99 0.00 149.54 10.00 0.00 0.00 1495.43 964,033.27
5019+560.00 0.00 69.40 0.00 143.40 10.00 0.00 0.00 1433.96 962,599.31
5019+580.00 0.00 72.63 0.00 142.03 10.00 0.00 0.00 1420.28 961,179.03
5019+600.00 0.00 84.76 0.00 157.39 10.00 0.00 0.00 1573.89 959,605.14
5019+620.00 0.00 103.02 0.00 187.78 10.00 0.00 0.00 1877.82 957,727.32
5019+640.00 0.00 100.38 0.00 203.40 10.00 0.00 0.00 2033.95 955,693.37
5019+660.00 0.00 106.71 0.00 207.09 10.00 0.00 0.00 2070.88 953,622.49
5019+680.00 0.00 98.51 0.00 205.23 10.00 0.00 0.00 2052.25 951,570.24
5019+700.00 0.00 81.30 0.00 179.81 10.00 0.00 0.00 1798.12 949,772.12
5019+700.00 0.00 83.68 0.00 164.98 0.00 0.00 0.00 0.00 949,772.12
5019+720.00 0.00 84.99 0.00 168.67 10.00 0.00 0.00 1686.69 948,085.43
5019+740.00 0.00 84.46 0.00 169.45 10.00 0.00 0.00 1694.49 946,390.94
5019+760.00 0.00 81.50 0.00 165.96 10.00 0.00 0.00 1659.61 944,731.33
5019+780.00 0.00 67.39 0.00 148.90 10.00 0.00 0.00 1488.96 943,242.37
5019+800.00 0.00 65.16 0.00 132.55 10.00 0.00 0.00 1325.53 941,916.84
5019+820.00 0.00 69.17 0.00 134.33 10.00 0.00 0.00 1343.25 940,573.59
5019+840.00 0.00 71.21 0.00 140.37 10.00 0.00 0.00 1403.74 939,169.85
5019+860.00 0.00 59.06 0.00 130.26 10.00 0.00 0.00 1302.64 937,867.21
5019+880.00 0.00 58.68 0.00 117.73 10.00 0.00 0.00 1177.31 936,689.90
5019+900.00 0.00 47.88 0.00 106.55 10.00 0.00 0.00 1065.50 935,624.40
5019+920.00 0.00 44.27 0.00 92.14 10.00 0.00 0.00 921.40 934,703.00
5019+940.00 0.00 29.94 0.00 74.21 10.00 0.00 0.00 742.06 933,960.94
5019+960.00 0.00 22.00 0.00 51.94 10.00 0.00 0.00 519.38 933,441.56
5019+980.00 0.00 17.59 0.00 39.58 10.00 0.00 0.00 395.83 933,045.73
5020+000.00 0.00 12.04 0.00 29.63 10.00 0.00 0.00 296.30 932,749.43
5020+020.00 0.00 11.05 0.00 23.10 10.00 0.00 0.00 230.98 932,518.45
215
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5020+040.00 0.00 18.01 0.00 29.06 10.00 0.00 0.00 290.64 932,227.81
5020+060.00 0.00 21.06 0.00 39.07 10.00 0.00 0.00 390.65 931,837.16
5020+080.00 0.00 17.82 0.00 38.88 10.00 0.00 0.00 388.79 931,448.37
5020+100.00 0.00 14.76 0.00 32.58 10.00 0.00 0.00 325.80 931,122.57
5020+120.00 0.00 14.18 0.00 28.93 10.00 0.00 0.00 289.34 930,833.23
5020+140.00 0.00 15.89 0.00 30.07 10.00 0.00 0.00 300.71 930,532.52
5020+160.00 0.00 16.84 0.00 32.73 10.00 0.00 0.00 327.30 930,205.22
5020+180.00 0.00 16.31 0.00 33.14 10.00 0.00 0.00 331.42 929,873.80
5020+200.00 0.00 19.04 0.00 35.35 10.00 0.00 0.00 353.48 929,520.32
5020+220.00 0.00 21.91 0.00 40.95 10.00 0.00 0.00 409.50 929,110.82
5020+240.00 0.00 21.39 0.00 43.30 10.00 0.00 0.00 432.97 928,677.85
5020+260.00 0.00 29.49 0.00 50.88 10.00 0.00 0.00 508.78 928,169.07
5020+280.00 0.00 28.46 0.00 57.94 10.00 0.00 0.00 579.44 927,589.63
5020+300.00 0.00 27.41 0.00 55.86 10.00 0.00 0.00 558.62 927,031.01
5020+320.00 0.00 28.07 0.00 55.47 10.00 0.00 0.00 554.74 926,476.27
5020+340.00 0.00 18.36 0.00 46.43 10.00 0.00 0.00 464.25 926,012.02
5020+360.00 0.00 14.23 0.00 32.59 10.00 0.00 0.00 325.91 925,686.11
5020+380.00 1.80 9.56 1.80 23.80 10.00 17.95 23.34 237.95 925,471.50
5020+400.00 0.47 9.58 2.27 19.14 10.00 22.68 29.48 191.36 925,309.62
5020+420.00 3.28 4.56 3.75 14.13 10.00 37.49 48.74 141.33 925,217.03
5020+440.00 8.98 1.80 12.25 6.35 10.00 122.51 159.26 63.53 925,312.76
5020+460.00 19.83 0.79 28.80 2.58 10.00 288.01 374.41 25.84 925,661.34
5020+480.00 20.61 0.97 40.43 1.76 10.00 404.34 525.64 17.60 926,169.38
5020+500.00 19.77 0.64 40.38 1.61 10.00 403.80 524.94 16.06 926,678.26
5020+520.00 13.92 1.63 33.69 2.27 10.00 336.90 437.97 22.69 927,093.54
5020+540.00 9.15 2.04 23.07 3.68 10.00 230.65 299.85 36.75 927,356.63
5020+560.00 3.13 2.68 12.27 4.73 10.00 122.72 159.54 47.25 927,468.92
5020+580.00 2.29 3.44 5.42 6.12 10.00 54.17 70.42 61.21 927,478.13
5020+600.00 4.79 3.70 7.08 7.13 10.00 70.80 92.04 71.34 927,498.83
5020+620.00 2.03 2.83 6.82 6.53 10.00 68.18 88.63 65.28 927,522.18
5020+640.00 1.45 2.32 3.48 5.15 10.00 34.82 45.27 51.46 927,515.99
5020+660.00 2.91 2.49 4.36 4.80 10.00 43.59 56.67 48.02 927,524.64
5020+680.00 2.57 2.53 5.48 5.02 10.00 54.76 71.19 50.21 927,545.61
5020+700.00 2.76 2.13 5.33 4.67 10.00 53.28 69.26 46.68 927,568.20
5020+720.00 0.75 2.94 3.51 5.07 10.00 35.08 45.60 50.72 927,563.08
5020+740.00 0.82 4.21 1.57 7.15 10.00 15.68 20.38 71.47 927,512.00
5020+760.00 0.00 9.09 0.82 13.30 10.00 8.19 10.65 133.03 927,389.61
5020+780.00 0.00 10.97 0.00 20.06 10.00 0.00 0.00 200.60 927,189.01
5020+800.00 0.00 15.47 0.00 26.44 10.00 0.00 0.00 264.36 926,924.65
5020+820.00 0.00 13.38 0.00 28.85 10.00 0.00 0.00 288.46 926,636.19
5020+840.00 0.00 13.02 0.00 26.39 10.00 0.00 0.00 263.92 926,372.27
5020+860.00 0.00 17.10 0.00 30.11 10.00 0.00 0.00 301.12 926,071.15
5020+880.00 0.00 14.25 0.00 31.35 10.00 0.00 0.00 313.45 925,757.70
5020+900.00 0.00 9.33 0.00 23.58 10.00 0.00 0.00 235.75 925,521.95
5020+920.00 0.41 5.63 0.41 14.95 10.00 4.12 5.36 149.53 925,377.78
216
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5020+940.00 3.93 2.06 4.35 7.69 10.00 43.46 56.50 76.85 925,357.43
5020+960.00 6.35 2.36 10.28 4.42 10.00 102.81 133.65 44.20 925,446.88
5020+980.00 12.97 0.39 19.31 2.76 10.00 193.14 251.08 27.56 925,670.40
5021+000.00 14.14 0.93 27.11 1.32 10.00 271.06 352.38 13.23 926,009.55
5021+020.00 13.23 1.35 27.36 2.28 10.00 273.64 355.73 22.75 926,342.53
5021+040.00 17.65 1.48 30.88 2.83 10.00 308.78 401.41 28.29 926,715.66
5021+060.00 10.62 2.81 28.28 4.30 10.00 282.76 367.59 42.95 927,040.29
5021+080.00 0.00 7.44 10.62 10.25 10.00 106.23 138.10 102.52 927,075.87
5021+100.00 0.00 9.38 0.00 16.82 10.00 0.00 0.00 168.18 926,907.69
5021+120.00 0.00 11.73 0.00 21.11 10.00 0.00 0.00 211.12 926,696.57
5021+140.00 0.00 15.57 0.00 27.31 10.00 0.00 0.00 273.08 926,423.49
5021+160.00 0.00 21.93 0.00 37.51 10.00 0.00 0.00 375.05 926,048.44
5021+180.00 0.00 27.50 0.00 49.44 10.00 0.00 0.00 494.35 925,554.09
5021+200.00 0.00 28.80 0.00 56.30 10.00 0.00 0.00 563.01 924,991.08
5021+220.00 0.00 38.93 0.00 67.72 10.00 0.00 0.00 677.22 924,313.86
5021+240.00 0.00 41.18 0.00 80.11 10.00 0.00 0.00 801.08 923,512.78
5021+260.00 0.00 39.03 0.00 80.21 10.00 0.00 0.00 802.11 922,710.67
5021+280.00 0.00 40.72 0.00 79.75 10.00 0.00 0.00 797.47 921,913.20
5021+300.00 0.00 43.34 0.00 84.05 10.00 0.00 0.00 840.54 921,072.66
5021+320.00 0.00 41.70 0.00 85.04 10.00 0.00 0.00 850.35 920,222.31
5021+340.00 0.00 43.12 0.00 84.82 10.00 0.00 0.00 848.15 919,374.16
5021+360.00 0.00 46.34 0.00 89.46 10.00 0.00 0.00 894.56 918,479.60
5021+380.00 0.00 45.70 0.00 92.04 10.00 0.00 0.00 920.39 917,559.21
5021+400.00 0.00 43.72 0.00 89.42 10.00 0.00 0.00 894.20 916,665.01
5021+420.00 0.00 43.50 0.00 87.22 10.00 0.00 0.00 872.21 915,792.80
5021+440.00 0.00 44.60 0.00 88.10 10.00 0.00 0.00 881.02 914,911.78
5021+460.00 0.00 47.41 0.00 92.01 10.00 0.00 0.00 920.14 913,991.64
5021+480.00 0.00 43.95 0.00 91.36 10.00 0.00 0.00 913.58 913,078.06
5021+500.00 0.00 32.32 0.00 76.26 10.00 0.00 0.00 762.62 912,315.44
5021+520.00 6.73 24.38 6.73 56.70 10.00 67.31 87.50 566.99 911,835.96
5021+540.00 10.60 24.13 17.33 48.51 10.00 173.29 225.28 485.09 911,576.14
5021+560.00 29.88 21.21 40.48 45.33 10.00 404.80 526.24 453.30 911,649.08
5021+560.00 33.90 21.85 63.79 43.05 0.00 0.00 0.00 0.00 911,649.08
5021+580.00 11.61 25.27 45.52 47.11 10.00 455.15 591.70 471.14 911,769.64
5021+600.00 36.62 18.17 48.24 43.44 10.00 482.35 627.06 434.37 911,962.32
5021+620.00 28.51 20.21 65.14 38.38 10.00 651.35 846.76 383.83 912,425.25
5021+640.00 0.00 28.63 28.51 48.84 10.00 285.11 370.64 488.38 912,307.51
5021+660.00 0.00 50.16 0.00 78.79 10.00 0.00 0.00 787.87 911,519.64
5021+680.00 0.00 60.46 0.00 110.62 10.00 0.00 0.00 1106.19 910,413.45
5021+700.00 0.00 71.84 0.00 132.30 10.00 0.00 0.00 1322.96 909,090.49
5021+720.00 0.00 67.64 0.00 139.48 10.00 0.00 0.00 1394.78 907,695.71
5021+740.00 0.00 71.25 0.00 138.89 10.00 0.00 0.00 1388.94 906,306.77
5021+760.00 0.00 83.46 0.00 154.71 10.00 0.00 0.00 1547.11 904,759.66
5021+780.00 0.00 89.17 0.00 172.62 10.00 0.00 0.00 1726.24 903,033.42
5021+800.00 0.00 86.04 0.00 175.20 10.00 0.00 0.00 1752.03 901,281.39
217
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5021+820.00 0.00 78.64 0.00 164.68 10.00 0.00 0.00 1646.75 899,634.64
5021+840.00 0.00 82.94 0.00 161.58 10.00 0.00 0.00 1615.80 898,018.84
5021+860.00 0.00 74.34 0.00 157.28 10.00 0.00 0.00 1572.84 896,446.00
5021+880.00 0.00 80.32 0.00 154.67 10.00 0.00 0.00 1546.66 894,899.34
5021+900.00 0.00 81.02 0.00 161.34 10.00 0.00 0.00 1613.42 893,285.92
5021+920.00 0.00 79.67 0.00 160.69 10.00 0.00 0.00 1606.89 891,679.03
5021+920.00 0.00 70.08 0.00 149.76 0.00 0.00 0.00 0.00 891,679.03
5021+940.00 0.00 77.44 0.00 147.53 10.00 0.00 0.00 1475.26 890,203.77
5021+960.00 0.00 81.29 0.00 158.74 10.00 0.00 0.00 1587.36 888,616.41
5021+980.00 0.00 75.37 0.00 156.67 10.00 0.00 0.00 1566.67 887,049.74
5022+000.00 0.00 49.61 0.00 124.98 10.00 0.00 0.00 1249.82 885,799.92
5022+020.00 0.00 62.13 0.00 111.74 10.00 0.00 0.00 1117.36 884,682.56
5022+040.00 0.00 60.76 0.00 122.88 10.00 0.00 0.00 1228.84 883,453.72
5022+060.00 0.00 63.33 0.00 124.08 10.00 0.00 0.00 1240.82 882,212.90
5022+080.00 0.00 65.70 0.00 129.02 10.00 0.00 0.00 1290.22 880,922.68
5022+100.00 0.00 55.45 0.00 121.14 10.00 0.00 0.00 1211.42 879,711.26
5022+120.00 0.00 58.28 0.00 113.72 10.00 0.00 0.00 1137.22 878,574.04
5022+140.00 0.00 46.33 0.00 104.61 10.00 0.00 0.00 1046.11 877,527.93
5022+160.00 0.00 39.34 0.00 85.68 10.00 0.00 0.00 856.76 876,671.17
5022+180.00 0.00 41.53 0.00 80.88 10.00 0.00 0.00 808.75 875,862.42
5022+200.00 0.00 26.99 0.00 68.52 10.00 0.00 0.00 685.18 875,177.24
5022+220.00 0.00 25.91 0.00 52.90 10.00 0.00 0.00 528.98 874,648.26
5022+240.00 0.00 21.98 0.00 47.90 10.00 0.00 0.00 478.97 874,169.29
5022+260.00 0.00 22.27 0.00 44.25 10.00 0.00 0.00 442.50 873,726.79
5022+280.00 0.00 16.69 0.00 38.96 10.00 0.00 0.00 389.56 873,337.23
5022+280.00 0.00 18.82 0.00 35.51 0.00 0.00 0.00 0.00 873,337.23
5022+300.00 0.00 21.20 0.00 40.02 10.00 0.00 0.00 400.20 872,937.03
5022+320.00 0.00 17.34 0.00 38.54 10.00 0.00 0.00 385.37 872,551.66
5022+340.00 0.00 14.77 0.00 32.11 10.00 0.00 0.00 321.07 872,230.59
5022+360.00 0.00 12.68 0.00 27.45 10.00 0.00 0.00 274.50 871,956.09
5022+380.00 0.00 12.78 0.00 25.45 10.00 0.00 0.00 254.54 871,701.55
5022+400.00 0.00 12.30 0.00 25.08 10.00 0.00 0.00 250.77 871,450.78
5022+420.00 0.00 10.56 0.00 22.86 10.00 0.00 0.00 228.56 871,222.22
5022+440.00 0.00 7.55 0.00 18.11 10.00 0.00 0.00 181.06 871,041.16
5022+460.00 0.01 6.37 0.01 13.92 10.00 0.10 0.13 139.18 870,902.11
5022+480.00 0.26 5.00 0.27 11.36 10.00 2.72 3.54 113.62 870,792.03
5022+490.00 0.31 4.37 0.57 9.36 5.00 2.84 3.69 46.82 870,748.90
5022+490.00 0.07 5.05 0.38 9.41 0.00 0.00 0.00 0.00 870,748.90
5022+500.00 0.09 4.43 0.16 9.47 5.00 0.82 1.07 47.37 870,702.61
5022+520.00 0.03 3.92 0.12 8.35 10.00 1.23 1.60 83.51 870,620.69
5022+540.00 0.21 3.26 0.24 7.18 10.00 2.40 3.12 71.83 870,551.98
5022+560.00 0.23 3.83 0.43 7.09 10.00 4.34 5.64 70.90 870,486.73
5022+580.00 0.00 7.85 0.23 11.68 10.00 2.26 2.94 116.75 870,372.91
5022+600.00 0.00 7.51 0.00 15.36 10.00 0.00 0.00 153.56 870,219.35
5022+620.00 0.00 6.38 0.00 13.89 10.00 0.00 0.00 138.86 870,080.49
218
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5022+640.00 0.00 9.23 0.00 15.61 10.00 0.00 0.00 156.06 869,924.43
5022+660.00 0.00 9.68 0.00 18.91 10.00 0.00 0.00 189.08 869,735.35
5022+680.00 0.00 8.30 0.00 17.97 10.00 0.00 0.00 179.73 869,555.62
5022+685.75 0.00 8.04 0.00 16.34 2.87 0.00 0.00 46.93 869,508.70
5022+700.00 0.00 7.10 0.00 15.14 7.13 0.00 0.00 107.92 869,400.78
5022+715.75 0.00 6.23 0.00 13.33 7.87 0.00 0.00 104.97 869,295.81
5022+720.00 0.00 5.99 0.00 12.22 2.13 0.00 0.00 26.01 869,269.80
5022+740.00 0.00 8.90 0.00 14.89 10.00 0.00 0.00 148.87 869,120.93
5022+760.00 0.00 7.93 0.00 16.82 10.00 0.00 0.00 168.22 868,952.71
5022+780.00 0.00 13.20 0.00 21.13 10.00 0.00 0.00 211.28 868,741.43
5022+800.00 0.00 12.84 0.00 26.04 10.00 0.00 0.00 260.42 868,481.01
5022+800.10 0.00 12.84 0.00 25.68 0.05 0.00 0.00 1.30 868,479.71
5022+820.00 0.00 13.73 0.00 26.57 9.95 0.00 0.00 264.39 868,215.33
5022+830.10 0.00 11.53 0.00 25.26 5.05 0.00 0.00 127.57 868,087.76
5022+840.00 0.00 10.94 0.00 22.47 4.95 0.00 0.00 111.19 867,976.57
5022+860.00 0.00 13.33 0.00 24.27 10.00 0.00 0.00 242.65 867,733.92
5022+880.00 0.00 9.64 0.00 22.97 10.00 0.00 0.00 229.65 867,504.27
5022+900.00 0.00 10.14 0.00 19.77 10.00 0.00 0.00 197.73 867,306.54
5022+920.00 0.00 9.13 0.00 19.27 10.00 0.00 0.00 192.69 867,113.85
5022+940.00 0.00 12.64 0.00 21.77 10.00 0.00 0.00 217.68 866,896.17
5022+960.00 0.00 9.41 0.00 22.04 10.00 0.00 0.00 220.42 866,675.75
5022+980.00 0.00 10.85 0.00 20.25 10.00 0.00 0.00 202.53 866,473.22
5023+000.00 0.00 9.32 0.00 20.17 10.00 0.00 0.00 201.68 866,271.54
5023+020.00 0.00 8.42 0.00 17.74 10.00 0.00 0.00 177.42 866,094.12
5023+040.00 0.00 8.03 0.00 16.45 10.00 0.00 0.00 164.49 865,929.63
5023+060.00 0.00 12.90 0.00 20.93 10.00 0.00 0.00 209.32 865,720.31
5023+080.00 0.00 19.37 0.00 32.27 10.00 0.00 0.00 322.71 865,397.60
5023+100.00 0.00 18.02 0.00 37.39 10.00 0.00 0.00 373.87 865,023.73
5023+100.00 0.00 18.02 0.00 36.04 0.00 0.00 0.00 0.00 865,023.73
5023+120.00 0.00 21.00 0.00 39.02 10.00 0.00 0.00 390.24 864,633.49
5023+140.00 0.00 27.06 0.00 48.06 10.00 0.00 0.00 480.60 864,152.89
5023+160.00 0.00 23.26 0.00 50.31 10.00 0.00 0.00 503.13 863,649.76
5023+180.00 0.00 21.50 0.00 44.76 10.00 0.00 0.00 447.56 863,202.20
5023+200.00 0.00 22.47 0.00 43.97 10.00 0.00 0.00 439.70 862,762.50
5023+220.00 0.00 19.37 0.00 41.84 10.00 0.00 0.00 418.43 862,344.07
5023+220.00 0.00 19.37 0.00 38.74 0.00 0.00 0.00 0.00 862,344.07
5023+240.00 0.00 9.43 0.00 28.80 10.00 0.00 0.00 288.00 862,056.07
5023+260.00 0.00 9.64 0.00 19.07 10.00 0.00 0.00 190.70 861,865.37
5023+280.00 0.00 14.72 0.00 24.36 10.00 0.00 0.00 243.63 861,621.74
5023+300.00 0.00 16.06 0.00 30.78 10.00 0.00 0.00 307.77 861,313.97
5023+320.00 0.00 16.33 0.00 32.39 10.00 0.00 0.00 323.88 860,990.09
5023+340.00 0.00 15.65 0.00 31.98 10.00 0.00 0.00 319.78 860,670.31
5023+360.00 0.00 14.45 0.00 30.10 10.00 0.00 0.00 300.98 860,369.33
5023+380.00 0.00 14.60 0.00 29.06 10.00 0.00 0.00 290.56 860,078.77
5023+400.00 0.00 8.74 0.00 23.34 10.00 0.00 0.00 233.39 859,845.38
219
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5023+420.00 0.00 6.47 0.00 15.20 10.00 0.00 0.00 152.01 859,693.37
5023+440.00 0.00 6.34 0.00 12.81 10.00 0.00 0.00 128.09 859,565.28
5023+460.00 0.00 6.57 0.00 12.91 10.00 0.00 0.00 129.10 859,436.18
5023+480.00 0.00 8.91 0.00 15.47 10.00 0.00 0.00 154.72 859,281.46
5023+500.00 0.00 12.86 0.00 21.77 10.00 0.00 0.00 217.66 859,063.80
5023+520.00 0.00 9.73 0.00 22.59 10.00 0.00 0.00 225.89 858,837.91
5023+540.00 0.00 9.00 0.00 18.72 10.00 0.00 0.00 187.23 858,650.68
5023+560.00 0.75 7.74 0.75 16.73 10.00 7.52 9.78 167.30 858,493.16
5023+580.00 0.00 7.12 0.75 14.85 10.00 7.52 9.78 148.51 858,354.42
5023+600.00 0.00 9.00 0.00 16.11 10.00 0.00 0.00 161.11 858,193.31
5023+620.00 0.00 9.97 0.00 18.97 10.00 0.00 0.00 189.69 858,003.62
5023+640.00 0.00 13.74 0.00 23.72 10.00 0.00 0.00 237.18 857,766.44
5023+660.00 0.00 12.82 0.00 26.56 10.00 0.00 0.00 265.63 857,500.81
5023+680.00 0.00 14.56 0.00 27.38 10.00 0.00 0.00 273.75 857,227.06
5023+700.00 0.00 15.65 0.00 30.21 10.00 0.00 0.00 302.05 856,925.01
5023+720.00 0.00 11.61 0.00 27.26 10.00 0.00 0.00 272.61 856,652.40
5023+740.00 0.00 12.06 0.00 23.68 10.00 0.00 0.00 236.75 856,415.65
5023+760.00 0.00 8.76 0.00 20.82 10.00 0.00 0.00 208.22 856,207.43
5023+770.00 0.00 7.57 0.00 16.33 5.00 0.00 0.00 81.63 856,125.80
5023+770.00 0.00 7.57 0.00 15.13 0.00 0.00 0.00 0.00 856,125.80
5023+780.00 0.00 7.09 0.00 14.66 5.00 0.00 0.00 73.30 856,052.51
5023+800.00 0.00 8.90 0.00 15.99 10.00 0.00 0.00 159.92 855,892.59
5023+820.00 0.00 6.79 0.00 15.69 10.00 0.00 0.00 156.92 855,735.67
5023+840.00 0.00 9.65 0.00 16.44 10.00 0.00 0.00 164.41 855,571.26
5023+860.00 0.00 13.03 0.00 22.68 10.00 0.00 0.00 226.76 855,344.50
5023+880.00 0.00 9.21 0.00 22.24 10.00 0.00 0.00 222.37 855,122.13
5023+900.00 0.00 15.11 0.00 24.32 10.00 0.00 0.00 243.16 854,878.97
5023+900.00 0.00 15.11 0.00 30.21 0.00 0.00 0.00 0.00 854,878.97
5023+920.00 0.00 15.99 0.00 31.09 10.00 0.00 0.00 310.94 854,568.03
5023+940.00 0.16 4.44 0.16 20.43 10.00 1.63 2.12 204.28 854,365.87
5023+960.00 1.25 2.39 1.42 6.83 10.00 14.16 18.41 68.31 854,315.96
5023+980.00 0.17 5.53 1.42 7.92 10.00 14.21 18.47 79.20 854,255.24
5024+000.00 1.10 3.12 1.27 8.65 10.00 12.71 16.52 86.48 854,185.28
5024+007.22 1.16 4.10 2.26 7.22 3.61 8.17 10.62 26.07 854,169.83
5024+020.00 1.22 6.22 2.37 10.32 6.39 15.17 19.72 65.95 854,123.59
5024+040.00 0.50 8.48 1.72 14.71 10.00 17.15 22.30 147.08 853,998.80
5024+060.00 0.02 7.71 0.52 16.19 10.00 5.16 6.71 161.94 853,843.57
5024+080.00 0.00 10.93 0.02 18.64 10.00 0.16 0.21 186.37 853,657.41
5024+100.00 0.00 12.32 0.00 23.25 10.00 0.00 0.00 232.51 853,424.90
5024+120.00 0.57 2.85 0.57 15.17 10.00 5.69 7.40 151.74 853,280.56
5024+137.22 0.94 2.51 1.51 5.36 8.61 12.96 16.85 46.14 853,251.26
5024+140.00 1.02 2.42 1.95 4.92 1.39 2.71 3.52 6.84 853,247.95
5024+160.00 0.50 2.63 1.51 5.04 10.00 15.13 19.67 50.40 853,217.22
5024+180.00 0.00 5.91 0.50 8.54 10.00 4.98 6.47 85.35 853,138.34
5024+200.00 0.56 8.20 0.56 14.11 10.00 5.61 7.29 141.10 853,004.54
220
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5024+220.00 0.00 12.19 0.56 20.39 10.00 5.61 7.29 203.90 852,807.93
5024+240.00 0.00 20.54 0.00 32.73 10.00 0.00 0.00 327.33 852,480.60
5024+250.00 0.00 21.85 0.00 42.39 5.00 0.00 0.00 211.97 852,268.63
5024+260.00 0.00 21.98 0.00 43.83 5.00 0.00 0.00 219.14 852,049.50
5024+280.00 0.00 19.13 0.00 41.11 10.00 0.00 0.00 411.08 851,638.42
5024+300.00 0.00 19.34 0.00 38.47 10.00 0.00 0.00 384.73 851,253.69
5024+320.00 0.00 18.01 0.00 37.35 10.00 0.00 0.00 373.48 850,880.21
5024+340.00 0.00 14.63 0.00 32.64 10.00 0.00 0.00 326.40 850,553.81
5024+360.00 0.00 12.59 0.00 27.22 10.00 0.00 0.00 272.24 850,281.57
5024+380.00 0.00 11.16 0.00 23.75 10.00 0.00 0.00 237.49 850,044.08
5024+400.00 0.00 9.12 0.00 20.28 10.00 0.00 0.00 202.79 849,841.29
5024+420.00 0.00 11.09 0.00 20.21 10.00 0.00 0.00 202.12 849,639.17
5024+440.00 0.00 14.95 0.00 26.04 10.00 0.00 0.00 260.44 849,378.73
5024+460.00 0.00 13.97 0.00 28.92 10.00 0.00 0.00 289.17 849,089.56
5024+480.00 0.00 13.95 0.00 27.91 10.00 0.00 0.00 279.11 848,810.45
5024+500.00 0.00 13.90 0.00 27.85 10.00 0.00 0.00 278.49 848,531.96
5024+515.53 0.00 14.41 0.00 28.32 7.76 0.00 0.00 219.80 848,312.16
5024+520.00 0.00 16.56 0.00 30.97 2.24 0.00 0.00 69.30 848,242.87
5024+535.53 0.00 19.87 0.00 36.43 7.76 0.00 0.00 282.81 847,960.06
5024+540.00 0.00 19.22 0.00 39.10 2.24 0.00 0.00 87.48 847,872.57
5024+560.00 0.00 15.10 0.00 34.33 10.00 0.00 0.00 343.25 847,529.32
5024+580.00 0.00 15.64 0.00 30.74 10.00 0.00 0.00 307.40 847,221.92
5024+588.65 0.00 17.61 0.00 33.25 4.32 0.00 0.00 143.77 847,078.16
5024+600.00 0.00 19.72 0.00 37.33 5.68 0.00 0.00 211.87 846,866.29
5024+620.00 0.00 18.13 0.00 37.85 10.00 0.00 0.00 378.48 846,487.81
5024+640.00 0.72 12.31 0.72 30.44 10.00 7.22 9.39 304.43 846,192.76
5024+640.00 0.80 11.40 1.53 23.71 0.00 0.00 0.00 0.00 846,192.76
5024+660.00 2.19 10.82 2.99 22.22 10.00 29.93 38.91 222.20 846,009.47
5024+680.00 2.22 11.59 4.40 22.41 10.00 44.04 57.25 224.07 845,842.65
5024+700.00 0.00 19.62 2.22 31.21 10.00 22.15 28.80 312.07 845,559.38
5024+718.65 0.00 24.74 0.00 44.36 9.32 0.00 0.00 413.63 845,145.75
5024+720.00 0.00 25.17 0.00 49.91 0.68 0.00 0.00 33.74 845,112.01
5024+740.00 0.00 36.28 0.00 61.44 10.00 0.00 0.00 614.43 844,497.58
5024+760.00 0.00 44.40 0.00 80.67 10.00 0.00 0.00 806.71 843,690.87
5024+780.00 0.00 47.09 0.00 91.49 10.00 0.00 0.00 914.87 842,776.00
5024+800.00 0.00 49.61 0.00 96.71 10.00 0.00 0.00 967.05 841,808.95
5024+815.00 0.00 36.92 0.00 86.53 7.50 0.00 0.00 648.96 841,159.99
5024+820.00 0.00 32.75 0.00 69.66 2.50 0.00 0.00 174.15 840,985.84
5024+825.00 0.00 28.50 0.00 61.24 2.50 0.00 0.00 153.11 840,832.73
5024+835.00 0.00 20.83 0.00 49.32 5.00 0.00 0.00 246.62 840,586.11
5024+840.00 0.00 17.42 0.00 38.25 2.50 0.00 0.00 95.62 840,490.49
5024+845.00 0.00 16.14 0.00 33.56 2.50 0.00 0.00 83.90 840,406.59
5024+855.00 0.00 14.01 0.00 30.15 5.00 0.00 0.00 150.75 840,255.84
5024+860.00 0.00 13.05 0.00 27.07 2.50 0.00 0.00 67.66 840,188.18
5024+865.00 0.00 12.92 0.00 25.97 2.50 0.00 0.00 64.93 840,123.25
221
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5024+875.00 0.00 12.75 0.00 25.67 5.00 0.00 0.00 128.35 839,994.90
5024+880.00 0.00 12.69 0.00 25.44 2.50 0.00 0.00 63.60 839,931.30
5024+885.00 0.00 14.43 0.00 27.12 2.50 0.00 0.00 67.81 839,863.49
5024+895.00 0.00 18.14 0.00 32.57 5.00 0.00 0.00 162.85 839,700.65
5024+900.00 0.00 20.11 0.00 38.25 2.50 0.00 0.00 95.62 839,605.03
5024+905.00 0.00 21.61 0.00 41.72 2.50 0.00 0.00 104.31 839,500.72
5024+915.00 0.00 24.62 0.00 46.23 5.00 0.00 0.00 231.17 839,269.55
5024+920.00 0.00 26.03 0.00 50.65 2.50 0.00 0.00 126.62 839,142.93
5024+925.00 0.00 25.69 0.00 51.72 2.50 0.00 0.00 129.30 839,013.63
5024+935.00 0.00 24.78 0.00 50.47 5.00 0.00 0.00 252.35 838,761.28
5024+940.00 0.00 24.25 0.00 49.03 2.50 0.00 0.00 122.58 838,638.70
5024+945.00 0.00 23.58 0.00 47.83 2.50 0.00 0.00 119.58 838,519.12
5024+955.00 0.00 22.26 0.00 45.84 5.00 0.00 0.00 229.20 838,289.92
5024+960.00 0.00 21.62 0.00 43.88 2.50 0.00 0.00 109.70 838,180.22
5024+980.00 0.00 14.00 0.00 35.62 10.00 0.00 0.00 356.17 837,824.05
5025+000.00 0.00 8.23 0.00 22.22 10.00 0.00 0.00 222.23 837,601.82
5025+000.00 0.00 7.13 0.00 15.35 0.00 0.00 0.00 0.00 837,601.82
5025+020.00 1.56 9.62 1.56 16.74 10.00 15.56 20.23 167.44 837,454.61
5025+040.00 3.68 8.97 5.24 18.59 10.00 52.37 68.08 185.92 837,336.77
5025+060.00 3.33 3.66 7.01 12.63 10.00 70.10 91.13 126.30 837,301.60
5025+080.00 2.66 8.15 5.99 11.81 10.00 59.93 77.91 118.09 837,261.42
5025+100.00 0.64 10.20 3.31 18.35 10.00 33.08 43.00 183.53 837,120.89
5025+120.00 0.96 5.60 1.60 15.80 10.00 15.99 20.79 157.97 836,983.71
5025+140.00 1.20 5.57 2.16 11.16 10.00 21.58 28.05 111.62 836,900.14
5025+160.00 0.62 7.18 1.83 12.75 10.00 18.26 23.74 127.49 836,796.39
5025+180.00 2.46 7.17 3.08 14.35 10.00 30.81 40.05 143.50 836,692.94
5025+200.00 2.88 9.31 5.33 16.48 10.00 53.33 69.33 164.80 836,597.47
5025+220.00 1.59 10.89 4.47 20.21 10.00 44.68 58.08 202.07 836,453.49
5025+240.00 2.11 10.23 3.70 21.13 10.00 37.01 48.11 211.25 836,290.35
5025+260.00 3.22 9.96 5.33 20.19 10.00 53.31 69.30 201.86 836,157.79
5025+270.00 3.06 9.70 6.29 19.66 5.00 31.43 40.86 98.28 836,100.38
5025+280.00 3.00 9.30 6.07 19.00 5.00 30.33 39.42 95.02 836,044.78
5025+290.00 2.52 8.41 5.52 17.71 5.00 27.62 35.90 88.57 835,992.11
5025+300.00 2.89 7.17 5.41 15.57 5.00 27.04 35.15 77.87 835,949.39
5025+310.00 3.11 5.93 6.00 13.10 5.00 29.98 38.97 65.48 835,922.88
5025+320.00 3.41 4.80 6.52 10.73 5.00 32.62 42.40 53.65 835,911.63
5025+330.00 4.01 4.34 7.42 9.14 5.00 37.12 48.26 45.70 835,914.19
5025+340.00 4.37 3.89 8.38 8.24 5.00 41.89 54.45 41.18 835,927.46
5025+350.00 1.99 3.56 6.36 7.46 5.00 31.79 41.33 37.28 835,931.51
5025+360.00 0.14 4.15 2.13 7.71 5.00 10.65 13.85 38.55 835,906.81
5025+370.00 0.23 4.26 0.37 8.40 5.00 1.86 2.41 42.02 835,867.20
5025+380.00 0.33 4.62 0.56 8.88 5.00 2.81 3.65 44.40 835,826.45
5025+390.00 0.24 4.87 0.57 9.49 5.00 2.86 3.72 47.47 835,782.70
5025+400.00 0.16 5.33 0.40 10.20 5.00 2.02 2.62 50.99 835,734.34
5025+420.00 0.00 5.53 0.16 10.86 10.00 1.60 2.08 108.57 835,627.85
222
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5025+440.00 0.00 7.84 0.00 13.37 10.00 0.00 0.00 133.66 835,494.19
5025+460.00 0.00 10.45 0.00 18.29 10.00 0.00 0.00 182.89 835,311.30
5025+480.00 0.00 7.02 0.00 17.47 10.00 0.00 0.00 174.73 835,136.57
5025+500.00 0.00 9.46 0.00 16.48 10.00 0.00 0.00 164.82 834,971.75
5025+520.00 0.00 8.07 0.00 17.54 10.00 0.00 0.00 175.35 834,796.40
5025+521.36 0.00 8.15 0.00 16.22 0.68 0.00 0.00 11.01 834,785.39
5025+540.00 0.27 7.32 0.27 15.47 9.32 2.49 3.24 144.18 834,644.44
5025+541.36 0.42 7.33 0.69 14.65 0.68 0.47 0.61 9.95 834,635.10
5025+550.36 0.39 7.27 0.81 14.60 4.50 3.64 4.73 65.71 834,574.13
5025+560.00 0.34 7.27 0.73 14.54 4.82 3.51 4.57 70.11 834,508.59
5025+580.00 0.00 6.82 0.34 14.09 10.00 3.40 4.42 140.92 834,372.09
5025+600.00 0.00 6.31 0.00 13.13 10.00 0.00 0.00 131.27 834,240.82
5025+620.00 0.00 6.34 0.00 12.65 10.00 0.00 0.00 126.52 834,114.30
5025+640.00 0.00 8.98 0.00 15.32 10.00 0.00 0.00 153.24 833,961.06
5025+640.36 0.00 9.07 0.00 18.05 0.18 0.00 0.00 3.24 833,957.82
5025+660.00 0.00 14.52 0.00 23.59 9.82 0.00 0.00 231.70 833,726.12
5025+680.00 0.00 15.25 0.00 29.77 10.00 0.00 0.00 297.69 833,428.43
5025+700.00 0.00 17.96 0.00 33.21 10.00 0.00 0.00 332.09 833,096.34
5025+720.00 0.00 18.36 0.00 36.32 10.00 0.00 0.00 363.19 832,733.15
5025+733.68 0.00 15.56 0.00 33.92 6.84 0.00 0.00 231.97 832,501.19
5025+740.00 0.00 14.53 0.00 30.09 3.16 0.00 0.00 95.11 832,406.08
5025+760.00 0.00 18.00 0.00 32.53 10.00 0.00 0.00 325.31 832,080.77
5025+780.00 0.00 19.18 0.00 37.18 10.00 0.00 0.00 371.82 831,708.95
5025+800.00 0.00 13.57 0.00 32.74 10.00 0.00 0.00 327.44 831,381.51
5025+820.00 0.00 10.77 0.00 24.34 10.00 0.00 0.00 243.38 831,138.13
5025+823.68 0.00 10.86 0.00 21.63 1.84 0.00 0.00 39.78 831,098.35
5025+840.00 0.00 11.14 0.00 22.00 8.16 0.00 0.00 179.52 830,918.83
5025+860.00 0.00 8.89 0.00 20.03 10.00 0.00 0.00 200.26 830,718.57
5025+880.00 0.00 9.62 0.00 18.51 10.00 0.00 0.00 185.06 830,533.51
5025+882.88 0.00 9.74 0.00 19.36 1.44 0.00 0.00 27.91 830,505.60
5025+900.00 0.00 10.14 0.00 19.88 8.56 0.00 0.00 170.11 830,335.50
5025+920.00 0.00 14.34 0.00 24.47 10.00 0.00 0.00 244.74 830,090.76
5025+940.00 0.00 14.80 0.00 29.14 10.00 0.00 0.00 291.38 829,799.38
5025+960.00 0.79 6.03 0.79 20.83 10.00 7.88 10.24 208.27 829,601.35
5025+980.00 2.89 1.80 3.68 7.83 10.00 36.77 47.80 78.27 829,570.88
5026+000.00 3.36 2.01 6.25 3.81 10.00 62.47 81.21 38.05 829,614.04
5026+020.00 0.00 4.47 3.36 6.48 10.00 33.58 43.65 64.75 829,592.95
5026+040.00 0.00 16.23 0.00 20.70 10.00 0.00 0.00 207.00 829,385.95
5026+060.00 0.00 10.78 0.00 27.01 10.00 0.00 0.00 270.10 829,115.85
5026+080.00 0.00 4.71 0.00 15.49 10.00 0.00 0.00 154.85 828,961.00
5026+100.00 0.00 9.47 0.00 14.18 10.00 0.00 0.00 141.76 828,819.24
5026+100.00 0.00 9.17 0.00 18.64 0.00 0.00 0.00 0.00 828,819.24
5026+120.00 0.00 21.93 0.00 31.10 10.00 0.00 0.00 310.99 828,508.25
5026+140.00 0.00 22.67 0.00 44.60 10.00 0.00 0.00 446.00 828,062.25
5026+160.00 0.00 21.27 0.00 43.93 10.00 0.00 0.00 439.34 827,622.91
223
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5026+180.00 0.00 12.80 0.00 34.07 10.00 0.00 0.00 340.72 827,282.19
5026+200.00 1.09 3.60 1.09 16.40 10.00 10.93 14.21 164.03 827,132.37
5026+220.00 1.53 2.22 2.62 5.82 10.00 26.21 34.07 58.20 827,108.24
5026+240.00 0.00 3.25 1.53 5.47 10.00 15.28 19.86 54.67 827,073.43
5026+260.00 0.00 17.12 0.00 20.37 10.00 0.00 0.00 203.70 826,869.73
5026+280.00 0.00 27.58 0.00 44.70 10.00 0.00 0.00 447.02 826,422.71
5026+300.00 0.00 29.46 0.00 57.04 10.00 0.00 0.00 570.42 825,852.29
5026+320.00 0.00 28.58 0.00 58.04 10.00 0.00 0.00 580.40 825,271.89
5026+340.00 0.00 17.64 0.00 46.22 10.00 0.00 0.00 462.19 824,809.70
5026+360.00 0.00 24.13 0.00 41.77 10.00 0.00 0.00 417.72 824,391.98
5026+380.00 0.00 13.21 0.00 37.34 10.00 0.00 0.00 373.36 824,018.62
5026+400.00 0.00 9.09 0.00 22.30 10.00 0.00 0.00 223.01 823,795.61
5026+420.00 0.00 7.15 0.00 16.24 10.00 0.00 0.00 162.42 823,633.19
5026+440.00 0.44 3.13 0.44 10.28 10.00 4.43 5.76 102.79 823,536.16
5026+460.00 1.84 2.44 2.28 5.57 10.00 22.82 29.67 55.73 823,510.10
5026+480.00 3.61 2.61 5.45 5.05 10.00 54.47 70.81 50.54 823,530.37
5026+500.00 0.00 8.45 3.61 11.06 10.00 36.08 46.90 110.63 823,466.64
5026+520.00 0.00 13.59 0.00 22.04 10.00 0.00 0.00 220.41 823,246.23
5026+540.00 0.00 22.19 0.00 35.78 10.00 0.00 0.00 357.82 822,888.41
5026+560.00 0.00 30.14 0.00 52.33 10.00 0.00 0.00 523.28 822,365.13
5026+580.00 0.00 35.91 0.00 66.05 10.00 0.00 0.00 660.49 821,704.64
5026+600.00 0.00 36.76 0.00 72.67 10.00 0.00 0.00 726.73 820,977.91
5026+620.00 0.00 36.49 0.00 73.25 10.00 0.00 0.00 732.54 820,245.37
5026+623.09 0.00 35.56 0.00 72.06 1.54 0.00 0.00 111.18 820,134.19
5026+640.00 0.00 30.87 0.00 66.43 8.46 0.00 0.00 561.79 819,572.40
5026+660.00 0.00 29.96 0.00 60.83 10.00 0.00 0.00 608.30 818,964.10
5026+680.00 0.00 29.10 0.00 59.07 10.00 0.00 0.00 590.67 818,373.43
5026+683.09 0.00 28.71 0.00 57.81 1.54 0.00 0.00 89.20 818,284.23
5026+700.00 0.00 26.46 0.00 55.16 8.46 0.00 0.00 466.49 817,817.74
5026+720.00 0.00 31.10 0.00 57.55 10.00 0.00 0.00 575.50 817,242.24
5026+740.00 0.00 10.70 0.00 41.79 10.00 0.00 0.00 417.90 816,824.34
5026+760.00 0.00 36.19 0.00 46.89 10.00 0.00 0.00 468.86 816,355.48
5026+771.35 0.00 35.84 0.00 72.03 5.68 0.00 0.00 408.83 815,946.65
5026+780.00 0.00 35.42 0.00 71.27 4.32 0.00 0.00 308.19 815,638.46
5026+800.00 0.00 19.00 0.00 54.42 10.00 0.00 0.00 544.23 815,094.23
5026+820.00 0.00 13.60 0.00 32.60 10.00 0.00 0.00 326.04 814,768.19
5026+831.35 0.00 16.19 0.00 29.80 5.68 0.00 0.00 169.11 814,599.08
5026+840.00 0.00 18.37 0.00 34.56 4.32 0.00 0.00 149.47 814,449.61
5026+860.00 0.00 34.02 0.00 52.39 10.00 0.00 0.00 523.88 813,925.73
5026+880.00 0.00 42.48 0.00 76.50 10.00 0.00 0.00 764.99 813,160.74
5026+900.00 0.00 48.85 0.00 91.33 10.00 0.00 0.00 913.33 812,247.41
5026+920.00 0.00 51.02 0.00 99.87 10.00 0.00 0.00 998.71 811,248.70
5026+940.00 0.00 43.99 0.00 95.01 10.00 0.00 0.00 950.05 810,298.65
5026+960.00 0.00 37.03 0.00 81.02 10.00 0.00 0.00 810.19 809,488.46
5026+980.00 0.00 30.25 0.00 67.28 10.00 0.00 0.00 672.83 808,815.63
224
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5027+000.00 0.00 37.38 0.00 67.63 10.00 0.00 0.00 676.34 808,139.29
5027+020.00 0.00 32.14 0.00 69.52 10.00 0.00 0.00 695.22 807,444.07
5027+020.00 0.00 33.66 0.00 65.80 0.00 0.00 0.00 0.00 807,444.07
5027+040.00 0.00 28.91 0.00 62.57 10.00 0.00 0.00 625.65 806,818.42
5027+060.00 0.00 21.55 0.00 50.46 10.00 0.00 0.00 504.56 806,313.86
5027+080.00 0.00 19.22 0.00 40.77 10.00 0.00 0.00 407.70 805,906.16
5027+100.00 0.00 16.00 0.00 35.22 10.00 0.00 0.00 352.22 805,553.94
5027+120.00 0.00 12.80 0.00 28.80 10.00 0.00 0.00 287.97 805,265.97
5027+140.00 0.00 12.88 0.00 25.68 10.00 0.00 0.00 256.77 805,009.20
5027+160.00 0.00 10.99 0.00 23.87 10.00 0.00 0.00 238.67 804,770.53
5027+180.00 0.00 14.78 0.00 25.76 10.00 0.00 0.00 257.63 804,512.90
5027+200.00 0.00 14.41 0.00 29.19 10.00 0.00 0.00 291.86 804,221.04
5027+220.00 0.00 22.22 0.00 36.63 10.00 0.00 0.00 366.33 803,854.71
5027+240.00 0.00 19.04 0.00 41.26 10.00 0.00 0.00 412.64 803,442.07
5027+260.00 0.00 20.77 0.00 39.81 10.00 0.00 0.00 398.07 803,044.00
5027+280.00 0.00 15.84 0.00 36.60 10.00 0.00 0.00 366.02 802,677.98
5027+300.00 0.00 18.28 0.00 34.12 10.00 0.00 0.00 341.18 802,336.80
5027+320.00 0.00 22.07 0.00 40.35 10.00 0.00 0.00 403.52 801,933.28
5027+340.00 0.00 34.69 0.00 56.76 10.00 0.00 0.00 567.57 801,365.71
5027+360.00 0.00 36.93 0.00 71.62 10.00 0.00 0.00 716.21 800,649.50
5027+380.00 0.00 28.29 0.00 65.23 10.00 0.00 0.00 652.25 799,997.25
5027+400.00 0.00 15.95 0.00 44.24 10.00 0.00 0.00 442.44 799,554.81
5027+420.00 0.00 12.61 0.00 28.56 10.00 0.00 0.00 285.64 799,269.17
5027+440.00 0.00 18.28 0.00 30.89 10.00 0.00 0.00 308.89 798,960.28
5027+460.00 0.00 16.01 0.00 34.29 10.00 0.00 0.00 342.91 798,617.37
5027+480.00 0.00 20.03 0.00 36.04 10.00 0.00 0.00 360.38 798,256.99
5027+500.00 0.00 23.78 0.00 43.81 10.00 0.00 0.00 438.07 797,818.92
5027+520.00 0.00 20.50 0.00 44.29 10.00 0.00 0.00 442.85 797,376.07
5027+540.00 0.00 18.40 0.00 38.90 10.00 0.00 0.00 389.03 796,987.04
5027+560.00 0.00 23.22 0.00 41.62 10.00 0.00 0.00 416.24 796,570.80
5027+580.00 0.00 23.94 0.00 47.16 10.00 0.00 0.00 471.60 796,099.20
5027+600.00 0.00 24.21 0.00 48.15 10.00 0.00 0.00 481.50 795,617.70
5027+620.00 0.00 17.08 0.00 41.29 10.00 0.00 0.00 412.90 795,204.80
5027+640.00 0.00 15.18 0.00 32.25 10.00 0.00 0.00 322.53 794,882.27
5027+660.00 0.00 12.17 0.00 27.35 10.00 0.00 0.00 273.49 794,608.78
5027+680.00 0.00 12.19 0.00 24.37 10.00 0.00 0.00 243.66 794,365.12
5027+700.00 0.00 5.31 0.00 17.50 10.00 0.00 0.00 175.01 794,190.11
5027+720.00 0.00 8.23 0.00 13.54 10.00 0.00 0.00 135.41 794,054.70
5027+740.00 0.00 10.31 0.00 18.54 10.00 0.00 0.00 185.39 793,869.31
5027+750.00 0.00 8.23 0.00 18.54 5.00 0.00 0.00 92.68 793,776.64
5027+750.00 0.00 12.06 0.00 20.29 0.00 0.00 0.00 0.00 793,776.64
5027+760.00 0.00 9.76 0.00 21.81 5.00 0.00 0.00 109.07 793,667.57
5027+780.00 0.59 5.51 0.59 15.26 10.00 5.91 7.68 152.63 793,522.62
5027+800.00 0.96 5.88 1.55 11.39 10.00 15.46 20.10 113.85 793,428.87
5027+820.00 2.63 4.42 3.58 10.30 10.00 35.83 46.58 103.01 793,372.44
225
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5027+840.00 2.95 3.98 5.58 8.40 10.00 55.77 72.50 84.01 793,360.93
5027+860.00 0.37 7.83 3.32 11.80 10.00 33.16 43.11 118.02 793,286.02
5027+880.00 0.30 10.91 0.66 18.73 10.00 6.64 8.63 187.32 793,107.33
5027+900.00 0.20 9.89 0.50 20.80 10.00 4.98 6.47 207.99 792,905.81
5027+920.00 3.89 3.79 4.09 13.68 10.00 40.92 53.20 136.81 792,822.20
5027+940.00 1.05 6.53 4.94 10.32 10.00 49.36 64.17 103.16 792,783.21
5027+960.00 0.00 11.72 1.05 18.24 10.00 10.45 13.59 182.43 792,614.36
5027+980.00 0.00 14.20 0.00 25.92 10.00 0.00 0.00 259.17 792,355.19
5028+000.00 0.00 15.53 0.00 29.73 10.00 0.00 0.00 297.31 792,057.88
5028+020.00 0.00 10.75 0.00 26.28 10.00 0.00 0.00 262.79 791,795.09
5028+040.00 0.00 13.54 0.00 24.29 10.00 0.00 0.00 242.89 791,552.20
5028+060.00 0.00 19.53 0.00 33.07 10.00 0.00 0.00 330.65 791,221.55
5028+080.00 0.00 20.83 0.00 40.36 10.00 0.00 0.00 403.57 790,817.98
5028+100.00 0.00 20.51 0.00 41.34 10.00 0.00 0.00 413.39 790,404.59
5028+120.00 0.00 18.28 0.00 38.79 10.00 0.00 0.00 387.91 790,016.68
5028+140.00 0.00 17.02 0.00 35.31 10.00 0.00 0.00 353.08 789,663.60
5028+160.00 0.00 19.59 0.00 36.61 10.00 0.00 0.00 366.12 789,297.48
5028+180.00 0.00 24.42 0.00 44.01 10.00 0.00 0.00 440.08 788,857.40
5028+200.00 0.00 27.09 0.00 51.51 10.00 0.00 0.00 515.14 788,342.26
5028+220.00 0.00 25.66 0.00 52.75 10.00 0.00 0.00 527.53 787,814.73
5028+240.00 0.00 16.99 0.00 42.65 10.00 0.00 0.00 426.48 787,388.25
5028+260.00 0.00 11.23 0.00 28.22 10.00 0.00 0.00 282.18 787,106.07
5028+280.00 0.00 16.98 0.00 28.21 10.00 0.00 0.00 282.09 786,823.98
5028+300.00 0.00 13.75 0.00 30.73 10.00 0.00 0.00 307.30 786,516.68
5028+320.00 0.00 13.04 0.00 26.79 10.00 0.00 0.00 267.86 786,248.82
5028+340.00 0.00 11.79 0.00 24.83 10.00 0.00 0.00 248.25 786,000.57
5028+360.00 0.00 13.88 0.00 25.67 10.00 0.00 0.00 256.67 785,743.90
5028+380.00 0.00 9.67 0.00 23.54 10.00 0.00 0.00 235.44 785,508.46
5028+400.00 0.00 10.33 0.00 19.99 10.00 0.00 0.00 199.91 785,308.55
5028+420.00 0.00 15.76 0.00 26.08 10.00 0.00 0.00 260.84 785,047.71
5028+440.00 0.00 21.35 0.00 37.11 10.00 0.00 0.00 371.07 784,676.64
5028+460.00 0.00 23.55 0.00 44.89 10.00 0.00 0.00 448.93 784,227.71
5028+480.00 0.00 25.87 0.00 49.41 10.00 0.00 0.00 494.10 783,733.61
5028+490.00 0.00 28.46 0.00 54.33 5.00 0.00 0.00 271.63 783,461.98
5028+490.00 0.00 25.82 0.00 54.28 0.00 0.00 0.00 0.00 783,461.98
5028+500.00 0.00 28.47 0.00 54.29 5.00 0.00 0.00 271.44 783,190.55
5028+520.00 0.00 28.56 0.00 57.02 10.00 0.00 0.00 570.23 782,620.32
5028+540.00 0.00 31.84 0.00 60.40 10.00 0.00 0.00 603.96 782,016.36
5028+560.00 0.00 22.36 0.00 54.20 10.00 0.00 0.00 541.97 781,474.39
5028+580.00 0.00 15.34 0.00 37.70 10.00 0.00 0.00 376.99 781,097.40
5028+600.00 0.00 17.12 0.00 32.46 10.00 0.00 0.00 324.64 780,772.76
5028+620.00 0.00 15.77 0.00 32.89 10.00 0.00 0.00 328.93 780,443.83
5028+640.00 0.00 15.23 0.00 31.00 10.00 0.00 0.00 309.96 780,133.87
5028+660.00 0.00 17.02 0.00 32.24 10.00 0.00 0.00 322.41 779,811.46
5028+680.00 0.00 24.15 0.00 41.17 10.00 0.00 0.00 411.67 779,399.79
226
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5028+700.00 0.00 25.78 0.00 49.93 10.00 0.00 0.00 499.30 778,900.49
5028+720.00 0.00 22.67 0.00 48.45 10.00 0.00 0.00 484.45 778,416.04
5028+740.00 0.00 18.77 0.00 41.44 10.00 0.00 0.00 414.38 778,001.66
5028+760.00 0.00 23.08 0.00 41.85 10.00 0.00 0.00 418.50 777,583.16
5028+780.00 0.00 23.28 0.00 46.36 10.00 0.00 0.00 463.58 777,119.58
5028+800.00 0.00 21.63 0.00 44.91 10.00 0.00 0.00 449.11 776,670.47
5028+820.00 0.00 20.49 0.00 42.12 10.00 0.00 0.00 421.18 776,249.29
5028+840.00 0.00 16.18 0.00 36.66 10.00 0.00 0.00 366.62 775,882.67
5028+860.00 0.00 15.95 0.00 32.13 10.00 0.00 0.00 321.29 775,561.38
5028+880.00 0.00 19.66 0.00 35.61 10.00 0.00 0.00 356.09 775,205.29
5028+900.00 0.00 20.25 0.00 39.91 10.00 0.00 0.00 399.05 774,806.24
5028+920.00 0.00 21.13 0.00 41.37 10.00 0.00 0.00 413.74 774,392.50
5028+920.00 0.00 22.83 0.00 43.96 0.00 0.00 0.00 0.00 774,392.50
5028+940.00 0.00 15.90 0.00 38.73 10.00 0.00 0.00 387.29 774,005.21
5028+960.00 0.00 20.10 0.00 35.99 10.00 0.00 0.00 359.92 773,645.29
5028+980.00 0.00 14.61 0.00 34.71 10.00 0.00 0.00 347.08 773,298.21
5029+000.00 0.00 16.76 0.00 31.37 10.00 0.00 0.00 313.69 772,984.52
5029+020.00 0.00 22.16 0.00 38.92 10.00 0.00 0.00 389.18 772,595.34
5029+040.00 0.00 21.07 0.00 43.23 10.00 0.00 0.00 432.28 772,163.06
5029+060.00 0.00 19.21 0.00 40.28 10.00 0.00 0.00 402.76 771,760.30
5029+080.00 0.00 19.48 0.00 38.69 10.00 0.00 0.00 386.85 771,373.45
5029+100.00 0.00 13.41 0.00 32.89 10.00 0.00 0.00 328.86 771,044.59
5029+120.00 0.00 12.22 0.00 25.63 10.00 0.00 0.00 256.31 770,788.28
5029+140.00 0.00 12.92 0.00 25.14 10.00 0.00 0.00 251.44 770,536.84
5029+160.00 0.00 11.30 0.00 24.22 10.00 0.00 0.00 242.22 770,294.62
5029+180.00 0.38 8.08 0.38 19.38 10.00 3.77 4.90 193.82 770,105.70
5029+200.00 0.00 9.25 0.38 17.34 10.00 3.77 4.90 173.36 769,937.24
5029+220.00 0.00 12.36 0.00 21.61 10.00 0.00 0.00 216.11 769,721.13
5029+240.00 0.00 12.29 0.00 24.65 10.00 0.00 0.00 246.48 769,474.65
5029+260.00 0.46 9.63 0.46 21.92 10.00 4.56 5.93 219.24 769,261.34
5029+280.00 0.00 13.79 0.46 23.43 10.00 4.56 5.93 234.27 769,032.99
5029+285.11 0.00 16.16 0.00 29.96 2.56 0.00 0.00 76.56 768,956.44
5029+300.00 0.00 20.69 0.00 36.85 7.44 0.00 0.00 274.33 768,682.11
5029+320.00 0.00 23.56 0.00 44.25 10.00 0.00 0.00 442.45 768,239.66
5029+340.00 0.00 20.61 0.00 44.17 10.00 0.00 0.00 441.69 767,797.97
5029+360.00 0.00 18.70 0.00 39.31 10.00 0.00 0.00 393.14 767,404.83
5029+380.00 0.00 17.56 0.00 36.26 10.00 0.00 0.00 362.61 767,042.22
5029+400.00 0.00 13.25 0.00 30.81 10.00 0.00 0.00 308.12 766,734.10
5029+420.00 0.00 8.67 0.00 21.92 10.00 0.00 0.00 219.22 766,514.88
5029+435.11 0.00 13.38 0.00 22.05 7.56 0.00 0.00 166.61 766,348.27
5029+440.00 0.00 15.02 0.00 28.41 2.44 0.00 0.00 69.44 766,278.83
5029+440.00 0.00 16.43 0.00 31.45 0.00 0.00 0.00 0.00 766,278.83
5029+460.00 0.00 19.93 0.00 36.36 10.00 0.00 0.00 363.59 765,915.24
5029+480.00 0.02 15.57 0.02 35.50 10.00 0.19 0.25 355.01 765,560.47
5029+500.00 0.25 17.26 0.27 32.83 10.00 2.67 3.47 328.32 765,235.62
227
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5029+520.00 0.39 14.43 0.64 31.69 10.00 6.40 8.32 316.85 764,927.09
5029+540.00 0.50 7.25 0.89 21.67 10.00 8.90 11.57 216.72 764,721.94
5029+560.00 0.49 6.67 0.99 13.91 10.00 9.92 12.90 139.14 764,595.70
5029+580.00 0.54 9.67 1.04 16.34 10.00 10.35 13.46 163.35 764,445.80
5029+600.00 0.64 8.65 1.18 18.32 10.00 11.76 15.29 183.19 764,277.90
5029+620.00 0.66 6.82 1.29 15.47 10.00 12.93 16.81 154.74 764,139.97
5029+640.00 0.49 11.63 1.15 18.46 10.00 11.50 14.95 184.55 763,970.37
5029+660.00 0.44 10.39 0.93 22.03 10.00 9.34 12.14 220.25 763,762.26
5029+680.00 0.23 14.29 0.67 24.68 10.00 6.70 8.71 246.80 763,524.17
5029+700.00 0.00 14.36 0.23 28.65 10.00 2.28 2.96 286.45 763,240.69
5029+720.00 0.29 8.21 0.29 22.57 10.00 2.88 3.74 225.69 763,018.74
5029+740.00 1.63 5.43 1.92 13.64 10.00 19.16 24.91 136.40 762,907.25
5029+740.00 1.63 5.43 3.26 10.86 0.00 0.00 0.00 0.00 762,907.25
5029+740.36 1.64 5.41 3.27 10.84 0.18 0.59 0.77 1.96 762,906.06
5029+760.00 2.77 4.79 4.41 10.21 9.82 43.32 56.32 100.21 762,862.16
5029+780.00 0.00 11.01 2.77 15.80 10.00 27.70 36.01 158.01 762,740.16
5029+800.00 0.00 22.19 0.00 33.19 10.00 0.00 0.00 331.93 762,408.23
5029+820.00 0.00 25.16 0.00 47.35 10.00 0.00 0.00 473.46 761,934.77
5029+840.00 0.00 25.26 0.00 50.42 10.00 0.00 0.00 504.17 761,430.60
5029+860.00 0.00 27.56 0.00 52.82 10.00 0.00 0.00 528.18 760,902.42
5029+880.00 0.00 31.52 0.00 59.08 10.00 0.00 0.00 590.84 760,311.58
5029+890.36 0.00 32.26 0.00 63.79 5.18 0.00 0.00 330.50 759,981.08
5029+900.00 0.00 32.93 0.00 65.20 4.82 0.00 0.00 314.15 759,666.93
5029+920.00 0.00 35.56 0.00 68.49 10.00 0.00 0.00 684.94 758,981.99
5029+940.00 0.00 33.95 0.00 69.51 10.00 0.00 0.00 695.06 758,286.93
5029+960.00 0.00 31.26 0.00 65.20 10.00 0.00 0.00 652.04 757,634.89
5029+980.00 0.00 28.18 0.00 59.44 10.00 0.00 0.00 594.36 757,040.53
5030+000.00 0.00 30.45 0.00 58.62 10.00 0.00 0.00 586.23 756,454.30
5030+020.00 0.00 31.98 0.00 62.43 10.00 0.00 0.00 624.30 755,830.00
5030+040.00 0.00 29.90 0.00 61.88 10.00 0.00 0.00 618.84 755,211.16
5030+060.00 0.00 27.53 0.00 57.43 10.00 0.00 0.00 574.32 754,636.84
5030+065.00 0.00 26.51 0.00 54.04 2.50 0.00 0.00 135.09 754,501.75
5030+065.00 0.00 20.95 0.00 47.45 0.00 0.00 0.00 0.00 754,501.75
5030+080.00 0.00 18.11 0.00 39.06 7.50 0.00 0.00 292.95 754,208.80
5030+100.00 0.00 16.15 0.00 34.26 10.00 0.00 0.00 342.64 753,866.16
5030+120.00 0.00 17.42 0.00 33.57 10.00 0.00 0.00 335.67 753,530.49
5030+140.00 0.00 17.79 0.00 35.20 10.00 0.00 0.00 352.04 753,178.45
5030+160.00 0.00 18.31 0.00 36.10 10.00 0.00 0.00 360.98 752,817.47
5030+180.00 0.00 17.40 0.00 35.71 10.00 0.00 0.00 357.11 752,460.36
5030+200.00 0.00 16.07 0.00 33.48 10.00 0.00 0.00 334.76 752,125.60
5030+220.00 0.00 12.12 0.00 28.20 10.00 0.00 0.00 281.96 751,843.64
5030+240.00 0.00 10.21 0.00 22.34 10.00 0.00 0.00 223.36 751,620.28
5030+260.00 0.00 9.57 0.00 19.78 10.00 0.00 0.00 197.80 751,422.48
5030+280.00 0.00 13.75 0.00 23.32 10.00 0.00 0.00 233.18 751,189.30
5030+300.00 0.00 13.12 0.00 26.87 10.00 0.00 0.00 268.74 750,920.56
228
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5030+320.00 0.00 15.39 0.00 28.51 10.00 0.00 0.00 285.08 750,635.48
5030+340.00 0.00 13.58 0.00 28.97 10.00 0.00 0.00 289.66 750,345.82
5030+360.00 0.00 11.43 0.00 25.01 10.00 0.00 0.00 250.12 750,095.70
5030+380.00 0.00 12.04 0.00 23.48 10.00 0.00 0.00 234.75 749,860.95
5030+400.00 0.00 10.18 0.00 22.23 10.00 0.00 0.00 222.26 749,638.69
5030+420.00 0.00 10.64 0.00 20.82 10.00 0.00 0.00 208.22 749,430.47
5030+440.00 0.00 13.01 0.00 23.65 10.00 0.00 0.00 236.51 749,193.96
5030+460.00 0.00 13.41 0.00 26.42 10.00 0.00 0.00 264.22 748,929.74
5030+480.00 0.00 15.04 0.00 28.45 10.00 0.00 0.00 284.46 748,645.28
5030+500.00 0.00 18.30 0.00 33.33 10.00 0.00 0.00 333.31 748,311.97
5030+520.00 0.00 18.50 0.00 36.80 10.00 0.00 0.00 367.96 747,944.01
5030+540.00 0.00 19.21 0.00 37.71 10.00 0.00 0.00 377.10 747,566.91
5030+560.00 0.00 21.76 0.00 40.97 10.00 0.00 0.00 409.68 747,157.23
5030+580.00 0.00 22.92 0.00 44.68 10.00 0.00 0.00 446.76 746,710.47
5030+600.00 0.00 25.88 0.00 48.80 10.00 0.00 0.00 487.99 746,222.48
5030+620.00 0.00 21.60 0.00 47.49 10.00 0.00 0.00 474.85 745,747.63
5030+640.00 0.00 18.56 0.00 40.16 10.00 0.00 0.00 401.61 745,346.02
5030+660.00 0.00 22.08 0.00 40.64 10.00 0.00 0.00 406.35 744,939.67
5030+680.00 0.00 20.03 0.00 42.11 10.00 0.00 0.00 421.10 744,518.57
5030+700.00 0.00 19.73 0.00 39.76 10.00 0.00 0.00 397.61 744,120.96
5030+713.58 0.00 20.99 0.00 40.71 6.79 0.00 0.00 276.44 743,844.52
5030+720.00 0.00 21.60 0.00 42.59 3.21 0.00 0.00 136.71 743,707.81
5030+740.00 0.00 19.78 0.00 41.38 10.00 0.00 0.00 413.83 743,293.98
5030+743.58 0.00 18.87 0.00 38.65 1.79 0.00 0.00 69.18 743,224.80
5030+760.00 0.00 15.09 0.00 33.95 8.21 0.00 0.00 278.75 742,946.05
5030+780.00 0.00 12.23 0.00 27.32 10.00 0.00 0.00 273.17 742,672.88
5030+800.00 0.00 13.15 0.00 25.38 10.00 0.00 0.00 253.84 742,419.04
5030+820.00 0.00 15.76 0.00 28.91 10.00 0.00 0.00 289.07 742,129.97
5030+831.05 0.00 17.03 0.00 32.78 5.52 0.00 0.00 181.11 741,948.86
5030+840.00 0.00 18.12 0.00 35.15 4.48 0.00 0.00 157.30 741,791.55
5030+860.00 0.00 19.47 0.00 37.59 10.00 0.00 0.00 375.90 741,415.65
5030+861.05 0.00 19.55 0.00 39.02 0.52 0.00 0.00 20.47 741,395.19
5030+880.00 0.00 21.57 0.00 41.12 9.48 0.00 0.00 389.59 741,005.59
5030+900.00 0.00 18.40 0.00 39.97 10.00 0.00 0.00 399.68 740,605.91
5030+920.00 0.00 18.85 0.00 37.25 10.00 0.00 0.00 372.54 740,233.37
5030+940.00 0.00 16.54 0.00 35.39 10.00 0.00 0.00 353.90 739,879.47
5030+940.00 0.00 17.13 0.00 33.67 0.00 0.00 0.00 0.00 739,879.47
5030+960.00 0.00 14.62 0.00 31.75 10.00 0.00 0.00 317.51 739,561.96
5030+980.00 0.00 18.04 0.00 32.66 10.00 0.00 0.00 326.55 739,235.41
5031+000.00 0.00 20.96 0.00 39.00 10.00 0.00 0.00 389.96 738,845.45
5031+020.00 0.00 20.82 0.00 41.78 10.00 0.00 0.00 417.77 738,427.68
5031+040.00 0.00 19.99 0.00 40.80 10.00 0.00 0.00 408.01 738,019.67
5031+060.00 0.00 20.09 0.00 40.07 10.00 0.00 0.00 400.72 737,618.95
5031+080.00 0.00 23.37 0.00 43.45 10.00 0.00 0.00 434.52 737,184.43
5031+100.00 0.00 21.58 0.00 44.95 10.00 0.00 0.00 449.45 736,734.98
229
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5031+120.00 0.00 22.24 0.00 43.82 10.00 0.00 0.00 438.20 736,296.78
5031+140.00 0.00 26.47 0.00 48.71 10.00 0.00 0.00 487.11 735,809.67
5031+160.00 0.00 24.73 0.00 51.20 10.00 0.00 0.00 512.04 735,297.63
5031+180.00 0.00 24.94 0.00 49.68 10.00 0.00 0.00 496.76 734,800.87
5031+200.00 0.00 27.66 0.00 52.61 10.00 0.00 0.00 526.06 734,274.81
5031+220.00 0.00 27.04 0.00 54.70 10.00 0.00 0.00 547.02 733,727.79
5031+240.00 0.00 26.92 0.00 53.96 10.00 0.00 0.00 539.59 733,188.20
5031+260.00 0.00 24.57 0.00 51.49 10.00 0.00 0.00 514.93 732,673.27
5031+280.00 0.00 23.74 0.00 48.31 10.00 0.00 0.00 483.10 732,190.17
5031+300.00 0.00 26.95 0.00 50.69 10.00 0.00 0.00 506.90 731,683.27
5031+320.00 0.00 27.92 0.00 54.87 10.00 0.00 0.00 548.68 731,134.59
5031+340.00 0.00 27.85 0.00 55.76 10.00 0.00 0.00 557.64 730,576.95
5031+360.00 0.00 27.29 0.00 55.14 10.00 0.00 0.00 551.39 730,025.56
5031+380.00 0.00 26.94 0.00 54.23 10.00 0.00 0.00 542.31 729,483.25
5031+400.00 0.00 23.86 0.00 50.80 10.00 0.00 0.00 508.00 728,975.25
5031+420.00 0.00 21.49 0.00 45.35 10.00 0.00 0.00 453.51 728,521.74
5031+440.00 0.00 20.84 0.00 42.33 10.00 0.00 0.00 423.33 728,098.41
5031+460.00 0.00 18.62 0.00 39.46 10.00 0.00 0.00 394.58 727,703.83
5031+480.00 0.00 16.24 0.00 34.85 10.00 0.00 0.00 348.52 727,355.31
5031+500.00 0.00 13.28 0.00 29.52 10.00 0.00 0.00 295.17 727,060.14
5031+520.00 0.00 10.75 0.00 24.03 10.00 0.00 0.00 240.32 726,819.82
5031+540.00 0.00 13.66 0.00 24.41 10.00 0.00 0.00 244.06 726,575.76
5031+560.00 0.00 17.74 0.00 31.40 10.00 0.00 0.00 313.95 726,261.81
5031+580.00 0.00 20.01 0.00 37.75 10.00 0.00 0.00 377.46 725,884.35
5031+600.00 0.00 20.29 0.00 40.29 10.00 0.00 0.00 402.92 725,481.43
5031+620.00 0.00 20.45 0.00 40.73 10.00 0.00 0.00 407.31 725,074.12
5031+640.00 0.00 21.90 0.00 42.35 10.00 0.00 0.00 423.46 724,650.66
5031+660.00 0.00 20.22 0.00 42.12 10.00 0.00 0.00 421.20 724,229.46
5031+680.00 0.00 20.11 0.00 40.33 10.00 0.00 0.00 403.31 723,826.15
5031+700.00 0.00 19.40 0.00 39.51 10.00 0.00 0.00 395.09 723,431.06
5031+720.00 0.00 21.45 0.00 40.85 10.00 0.00 0.00 408.45 723,022.61
5031+740.00 0.00 24.53 0.00 45.98 10.00 0.00 0.00 459.75 722,562.86
5031+760.00 0.00 26.04 0.00 50.57 10.00 0.00 0.00 505.65 722,057.21
5031+780.00 0.00 24.16 0.00 50.20 10.00 0.00 0.00 501.97 721,555.24
5031+800.00 0.00 20.00 0.00 44.16 10.00 0.00 0.00 441.61 721,113.63
5031+820.00 0.00 19.70 0.00 39.70 10.00 0.00 0.00 396.98 720,716.65
5031+840.00 0.00 19.58 0.00 39.28 10.00 0.00 0.00 392.78 720,323.87
5031+860.00 0.00 24.78 0.00 44.36 10.00 0.00 0.00 443.56 719,880.31
5031+880.00 0.00 29.98 0.00 54.76 10.00 0.00 0.00 547.55 719,332.76
5031+900.00 0.00 28.58 0.00 58.56 10.00 0.00 0.00 585.62 718,747.14
5031+920.00 0.00 27.81 0.00 56.40 10.00 0.00 0.00 563.96 718,183.18
5031+940.00 0.00 28.16 0.00 55.97 10.00 0.00 0.00 559.72 717,623.46
5031+960.00 0.00 23.35 0.00 51.51 10.00 0.00 0.00 515.06 717,108.40
5031+980.00 0.00 17.12 0.00 40.47 10.00 0.00 0.00 404.68 716,703.72
5032+000.00 0.00 17.40 0.00 34.52 10.00 0.00 0.00 345.24 716,358.48
230
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5032+020.00 0.00 20.80 0.00 38.21 10.00 0.00 0.00 382.06 715,976.42
5032+040.00 0.00 21.23 0.00 42.03 10.00 0.00 0.00 420.33 715,556.09
5032+060.00 0.00 18.73 0.00 39.96 10.00 0.00 0.00 399.60 715,156.49
5032+080.00 0.00 19.92 0.00 38.65 10.00 0.00 0.00 386.50 714,769.99
5032+100.00 0.00 19.04 0.00 38.97 10.00 0.00 0.00 389.65 714,380.34
5032+120.00 0.00 17.83 0.00 36.88 10.00 0.00 0.00 368.76 714,011.58
5032+140.00 0.00 20.41 0.00 38.24 10.00 0.00 0.00 382.39 713,629.19
5032+160.00 0.00 21.85 0.00 42.25 10.00 0.00 0.00 422.52 713,206.67
5032+180.00 0.00 21.56 0.00 43.41 10.00 0.00 0.00 434.09 712,772.58
5032+200.00 0.00 18.41 0.00 39.98 10.00 0.00 0.00 399.77 712,372.81
5032+220.00 0.00 11.71 0.00 30.12 10.00 0.00 0.00 301.21 712,071.60
5032+240.00 0.30 9.86 0.30 21.57 10.00 3.00 3.90 215.65 711,859.85
5032+260.00 0.00 10.95 0.30 20.81 10.00 3.00 3.90 208.11 711,655.64
5032+280.00 0.00 12.58 0.00 23.53 10.00 0.00 0.00 235.31 711,420.33
5032+300.00 0.00 17.29 0.00 29.87 10.00 0.00 0.00 298.67 711,121.66
5032+320.00 0.00 25.35 0.00 42.64 10.00 0.00 0.00 426.42 710,695.24
5032+340.00 0.00 25.02 0.00 50.38 10.00 0.00 0.00 503.76 710,191.48
5032+360.00 0.00 22.51 0.00 47.53 10.00 0.00 0.00 475.29 709,716.19
5032+380.00 0.00 24.84 0.00 47.34 10.00 0.00 0.00 473.41 709,242.78
5032+400.00 0.00 25.01 0.00 49.85 10.00 0.00 0.00 498.50 708,744.28
5032+420.00 0.00 24.92 0.00 49.94 10.00 0.00 0.00 499.36 708,244.92
5032+440.00 0.00 22.79 0.00 47.71 10.00 0.00 0.00 477.12 707,767.80
5032+460.00 0.00 24.94 0.00 47.73 10.00 0.00 0.00 477.30 707,290.50
5032+480.00 0.00 27.77 0.00 52.71 10.00 0.00 0.00 527.08 706,763.42
5032+500.00 0.00 26.13 0.00 53.90 10.00 0.00 0.00 538.96 706,224.46
5032+520.00 0.00 24.31 0.00 50.43 10.00 0.00 0.00 504.33 705,720.13
5032+540.00 0.00 24.57 0.00 48.87 10.00 0.00 0.00 488.70 705,231.43
5032+560.00 0.00 27.32 0.00 51.88 10.00 0.00 0.00 518.80 704,712.63
5032+580.00 0.00 31.56 0.00 58.88 10.00 0.00 0.00 588.78 704,123.85
5032+600.00 0.00 30.75 0.00 62.32 10.00 0.00 0.00 623.16 703,500.69
5032+620.00 0.00 26.92 0.00 57.68 10.00 0.00 0.00 576.77 702,923.92
5032+640.00 0.00 27.57 0.00 54.50 10.00 0.00 0.00 544.96 702,378.96
5032+660.00 0.00 32.02 0.00 59.59 10.00 0.00 0.00 595.87 701,783.09
5032+680.00 0.00 32.79 0.00 64.80 10.00 0.00 0.00 648.00 701,135.09
5032+700.00 0.00 29.88 0.00 62.66 10.00 0.00 0.00 626.63 700,508.46
5032+720.00 0.00 24.07 0.00 53.94 10.00 0.00 0.00 539.43 699,969.03
5032+740.00 0.00 21.15 0.00 45.21 10.00 0.00 0.00 452.14 699,516.89
5032+760.00 0.00 23.19 0.00 44.33 10.00 0.00 0.00 443.34 699,073.55
5032+780.00 0.00 25.23 0.00 48.42 10.00 0.00 0.00 484.17 698,589.38
5032+800.00 0.00 25.97 0.00 51.20 10.00 0.00 0.00 511.97 698,077.41
5032+820.00 0.00 28.29 0.00 54.25 10.00 0.00 0.00 542.53 697,534.88
5032+840.00 0.00 25.89 0.00 54.18 10.00 0.00 0.00 541.82 696,993.06
5032+860.00 0.00 22.77 0.00 48.66 10.00 0.00 0.00 486.60 696,506.46
5032+880.00 0.00 26.85 0.00 49.62 10.00 0.00 0.00 496.18 696,010.28
5032+900.00 0.00 29.56 0.00 56.41 10.00 0.00 0.00 564.12 695,446.16
231
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5032+920.00 0.00 26.36 0.00 55.92 10.00 0.00 0.00 559.20 694,886.96
5032+940.00 0.00 26.80 0.00 53.16 10.00 0.00 0.00 531.62 694,355.34
5032+960.00 0.00 26.24 0.00 53.04 10.00 0.00 0.00 530.41 693,824.93
5032+980.00 0.00 26.78 0.00 53.02 10.00 0.00 0.00 530.23 693,294.70
5033+000.00 0.00 31.52 0.00 58.30 10.00 0.00 0.00 583.00 692,711.70
5033+020.00 0.00 34.78 0.00 66.30 10.00 0.00 0.00 662.98 692,048.72
5033+040.00 0.00 30.66 0.00 65.44 10.00 0.00 0.00 654.44 691,394.28
5033+060.00 0.00 25.64 0.00 56.30 10.00 0.00 0.00 562.98 690,831.30
5033+080.00 0.00 20.94 0.00 46.58 10.00 0.00 0.00 465.78 690,365.52
5033+100.00 0.00 25.19 0.00 46.13 10.00 0.00 0.00 461.29 689,904.23
5033+120.00 0.00 32.53 0.00 57.72 10.00 0.00 0.00 577.20 689,327.03
5033+140.00 0.00 33.10 0.00 65.63 10.00 0.00 0.00 656.28 688,670.75
5033+160.00 0.00 32.95 0.00 66.05 10.00 0.00 0.00 660.45 688,010.30
5033+180.00 0.00 31.18 0.00 64.13 10.00 0.00 0.00 641.31 687,368.99
5033+200.00 0.00 27.42 0.00 58.61 10.00 0.00 0.00 586.05 686,782.94
5033+220.00 0.00 28.39 0.00 55.81 10.00 0.00 0.00 558.10 686,224.84
5033+240.00 0.00 31.91 0.00 60.30 10.00 0.00 0.00 603.00 685,621.84
5033+260.00 0.00 31.17 0.00 63.09 10.00 0.00 0.00 630.86 684,990.98
5033+280.00 0.00 27.28 0.00 58.45 10.00 0.00 0.00 584.47 684,406.51
5033+300.00 0.00 28.67 0.00 55.94 10.00 0.00 0.00 559.43 683,847.08
5033+320.00 0.00 32.73 0.00 61.40 10.00 0.00 0.00 613.97 683,233.11
5033+340.00 0.00 35.75 0.00 68.48 10.00 0.00 0.00 684.80 682,548.31
5033+360.00 0.00 31.69 0.00 67.44 10.00 0.00 0.00 674.42 681,873.89
5033+380.00 0.00 26.29 0.00 57.98 10.00 0.00 0.00 579.81 681,294.08
5033+400.00 0.00 25.74 0.00 52.03 10.00 0.00 0.00 520.26 680,773.82
5033+420.00 0.00 24.61 0.00 50.35 10.00 0.00 0.00 503.50 680,270.32
5033+440.00 0.00 19.44 0.00 44.06 10.00 0.00 0.00 440.55 679,829.77
5033+460.00 0.00 20.85 0.00 40.29 10.00 0.00 0.00 402.88 679,426.89
5033+480.00 0.00 25.50 0.00 46.35 10.00 0.00 0.00 463.46 678,963.43
5033+500.00 0.00 28.99 0.00 54.49 10.00 0.00 0.00 544.89 678,418.54
5033+520.00 0.00 28.25 0.00 57.24 10.00 0.00 0.00 572.35 677,846.19
5033+540.00 0.00 26.01 0.00 54.25 10.00 0.00 0.00 542.52 677,303.67
5033+560.00 0.00 25.06 0.00 51.07 10.00 0.00 0.00 510.66 676,793.01
5033+580.00 0.00 23.03 0.00 48.09 10.00 0.00 0.00 480.93 676,312.08
5033+600.00 0.00 21.04 0.00 44.07 10.00 0.00 0.00 440.73 675,871.35
5033+620.00 0.00 21.35 0.00 42.39 10.00 0.00 0.00 423.92 675,447.43
5033+640.00 0.00 20.36 0.00 41.71 10.00 0.00 0.00 417.09 675,030.34
5033+660.00 0.00 23.67 0.00 44.03 10.00 0.00 0.00 440.25 674,590.09
5033+680.00 0.00 20.73 0.00 44.40 10.00 0.00 0.00 443.97 674,146.12
5033+700.00 0.00 18.01 0.00 38.74 10.00 0.00 0.00 387.38 673,758.74
5033+720.00 0.00 18.72 0.00 36.73 10.00 0.00 0.00 367.27 673,391.47
5033+740.00 0.00 22.93 0.00 41.64 10.00 0.00 0.00 416.42 672,975.05
5033+750.00 0.00 25.81 0.00 48.74 5.00 0.00 0.00 243.68 672,731.37
5033+760.00 0.00 28.68 0.00 54.49 5.00 0.00 0.00 272.44 672,458.93
5033+763.47 0.00 28.22 0.00 56.90 1.74 0.00 0.00 98.80 672,360.13
232
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5033+780.00 0.00 26.26 0.00 54.48 8.26 0.00 0.00 450.19 671,909.94
5033+793.47 0.00 25.94 0.00 52.20 6.74 0.00 0.00 351.66 671,558.29
5033+800.00 0.00 25.85 0.00 51.79 3.26 0.00 0.00 169.02 671,389.26
5033+820.00 0.00 24.01 0.00 49.86 10.00 0.00 0.00 498.58 670,890.68
5033+840.00 0.00 26.89 0.00 50.90 10.00 0.00 0.00 509.02 670,381.66
5033+860.00 0.00 28.85 0.00 55.74 10.00 0.00 0.00 557.40 669,824.26
5033+877.83 0.00 28.92 0.00 57.77 8.92 0.00 0.00 515.05 669,309.21
5033+880.00 0.00 28.93 0.00 57.85 1.08 0.00 0.00 62.74 669,246.48
5033+900.00 0.00 28.07 0.00 56.99 10.00 0.00 0.00 569.93 668,676.55
5033+907.83 0.00 26.10 0.00 54.16 3.92 0.00 0.00 212.08 668,464.47
5033+920.00 0.00 23.30 0.00 49.40 6.08 0.00 0.00 300.57 668,163.89
5033+940.00 0.00 21.81 0.00 45.12 10.00 0.00 0.00 451.17 667,712.72
5033+960.00 0.00 26.01 0.00 47.83 10.00 0.00 0.00 478.25 667,234.47
5033+980.00 0.00 30.55 0.00 56.56 10.00 0.00 0.00 565.63 666,668.84
5034+000.00 0.00 27.72 0.00 58.27 10.00 0.00 0.00 582.73 666,086.11
5034+020.00 0.00 27.15 0.00 54.87 10.00 0.00 0.00 548.68 665,537.43
5034+040.00 0.00 30.51 0.00 57.65 10.00 0.00 0.00 576.53 664,960.90
5034+060.00 0.00 23.87 0.00 54.38 10.00 0.00 0.00 543.76 664,417.14
5034+080.00 0.00 19.66 0.00 43.53 10.00 0.00 0.00 435.26 663,981.88
5034+100.00 0.00 16.77 0.00 36.43 10.00 0.00 0.00 364.26 663,617.62
5034+120.00 0.00 16.19 0.00 32.96 10.00 0.00 0.00 329.60 663,288.02
5034+140.00 0.00 20.09 0.00 36.28 10.00 0.00 0.00 362.80 662,925.22
5034+160.00 0.00 26.91 0.00 47.00 10.00 0.00 0.00 469.97 662,455.25
5034+180.00 0.00 28.21 0.00 55.11 10.00 0.00 0.00 551.12 661,904.13
5034+200.00 0.00 17.54 0.00 45.75 10.00 0.00 0.00 457.48 661,446.65
5034+200.00 0.00 17.69 0.00 35.24 0.00 0.00 0.00 0.00 661,446.65
5034+220.00 0.00 10.85 0.00 28.54 10.00 0.00 0.00 285.40 661,161.25
5034+240.00 0.00 13.77 0.00 24.62 10.00 0.00 0.00 246.15 660,915.10
5034+260.00 0.00 20.48 0.00 34.25 10.00 0.00 0.00 342.48 660,572.62
5034+280.00 0.00 23.44 0.00 43.92 10.00 0.00 0.00 439.15 660,133.47
5034+290.00 0.00 25.95 0.00 49.38 5.00 0.00 0.00 246.91 659,886.56
5034+290.00 0.00 28.62 0.00 54.57 0.00 0.00 0.00 0.00 659,886.56
5034+300.00 0.00 30.65 0.00 59.27 5.00 0.00 0.00 296.34 659,590.22
5034+320.00 0.00 31.85 0.00 62.50 10.00 0.00 0.00 624.97 658,965.25
5034+340.00 0.00 34.91 0.00 66.76 10.00 0.00 0.00 667.62 658,297.63
5034+360.00 0.00 35.57 0.00 70.49 10.00 0.00 0.00 704.86 657,592.77
5034+380.00 0.00 26.98 0.00 62.55 10.00 0.00 0.00 625.50 656,967.27
5034+400.00 0.00 25.01 0.00 51.99 10.00 0.00 0.00 519.89 656,447.38
5034+420.00 0.00 20.26 0.00 45.27 10.00 0.00 0.00 452.68 655,994.70
5034+440.00 0.00 12.32 0.00 32.58 10.00 0.00 0.00 325.75 655,668.95
5034+450.00 0.00 11.10 0.00 23.42 5.00 0.00 0.00 117.08 655,551.87
5034+460.00 0.00 9.90 0.00 21.00 5.00 0.00 0.00 104.99 655,446.88
5034+480.00 0.00 12.58 0.00 22.48 10.00 0.00 0.00 224.76 655,222.12
5034+500.00 0.00 17.05 0.00 29.62 10.00 0.00 0.00 296.24 654,925.88
5034+520.00 0.00 19.60 0.00 36.65 10.00 0.00 0.00 366.52 654,559.36
233
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5034+540.00 0.00 18.62 0.00 38.22 10.00 0.00 0.00 382.21 654,177.15
5034+560.00 0.00 14.22 0.00 32.84 10.00 0.00 0.00 328.37 653,848.78
5034+580.00 0.00 11.86 0.00 26.08 10.00 0.00 0.00 260.75 653,588.03
5034+600.00 0.00 11.94 0.00 23.79 10.00 0.00 0.00 237.90 653,350.13
5034+620.00 0.00 14.52 0.00 26.45 10.00 0.00 0.00 264.51 653,085.62
5034+640.00 0.00 17.53 0.00 32.04 10.00 0.00 0.00 320.41 652,765.21
5034+660.00 0.00 22.77 0.00 40.30 10.00 0.00 0.00 402.98 652,362.23
5034+680.00 0.00 25.48 0.00 48.25 10.00 0.00 0.00 482.52 651,879.71
5034+700.00 0.00 28.21 0.00 53.69 10.00 0.00 0.00 536.89 651,342.82
5034+720.00 0.00 31.00 0.00 59.21 10.00 0.00 0.00 592.08 650,750.74
5034+740.00 0.00 27.14 0.00 58.14 10.00 0.00 0.00 581.39 650,169.35
5034+760.00 0.00 19.43 0.00 46.57 10.00 0.00 0.00 465.68 649,703.67
5034+780.00 0.00 19.14 0.00 38.56 10.00 0.00 0.00 385.63 649,318.04
5034+800.00 0.00 20.56 0.00 39.70 10.00 0.00 0.00 396.96 648,921.08
5034+820.00 0.00 27.12 0.00 47.68 10.00 0.00 0.00 476.75 648,444.33
5034+840.00 0.00 30.05 0.00 57.17 10.00 0.00 0.00 571.69 647,872.64
5034+860.00 0.00 28.74 0.00 58.79 10.00 0.00 0.00 587.91 647,284.73
5034+880.00 0.00 24.12 0.00 52.86 10.00 0.00 0.00 528.61 646,756.12
5034+900.00 0.00 18.03 0.00 42.16 10.00 0.00 0.00 421.57 646,334.55
5034+920.00 0.00 17.48 0.00 35.52 10.00 0.00 0.00 355.17 645,979.38
5034+940.00 0.00 18.46 0.00 35.95 10.00 0.00 0.00 359.47 645,619.91
5034+960.00 0.00 15.37 0.00 33.83 10.00 0.00 0.00 338.32 645,281.59
5034+980.00 0.00 11.45 0.00 26.82 10.00 0.00 0.00 268.20 645,013.39
5035+000.00 0.00 10.85 0.00 22.30 10.00 0.00 0.00 223.03 644,790.36
5035+020.00 0.00 10.51 0.00 21.36 10.00 0.00 0.00 213.64 644,576.72
5035+028.75 1.15 7.39 1.15 17.90 4.38 5.01 6.52 78.34 644,504.89
5035+040.00 6.68 5.78 7.82 13.17 5.62 43.99 57.19 74.04 644,488.04
5035+058.75 0.00 13.40 6.68 19.18 9.38 62.62 81.41 179.82 644,389.62
5035+060.00 0.00 14.43 0.00 27.83 0.62 0.00 0.00 17.34 644,372.28
5035+080.00 0.00 19.45 0.00 33.89 10.00 0.00 0.00 338.88 644,033.40
5035+100.00 0.00 18.25 0.00 37.70 10.00 0.00 0.00 377.00 643,656.40
5035+100.00 0.00 17.48 0.00 35.72 0.00 0.00 0.00 0.00 643,656.40
5035+120.00 0.00 12.90 0.00 30.38 10.00 0.00 0.00 303.76 643,352.64
5035+140.00 0.00 8.67 0.00 21.57 10.00 0.00 0.00 215.72 643,136.92
5035+143.04 0.00 8.32 0.00 16.99 1.52 0.00 0.00 25.86 643,111.07
5035+160.00 0.00 6.73 0.00 15.05 8.48 0.00 0.00 127.63 642,983.44
5035+173.04 0.00 8.31 0.00 15.04 6.52 0.00 0.00 98.08 642,885.36
5035+180.00 0.00 9.28 0.00 17.59 3.48 0.00 0.00 61.18 642,824.18
5035+200.00 0.00 12.82 0.00 22.10 10.00 0.00 0.00 220.96 642,603.22
5035+220.00 0.00 10.85 0.00 23.67 10.00 0.00 0.00 236.67 642,366.55
5035+240.00 0.00 8.38 0.00 19.23 10.00 0.00 0.00 192.30 642,174.25
5035+260.00 6.46 4.25 6.46 12.63 10.00 64.57 83.94 126.26 642,131.94
5035+280.00 14.08 4.03 20.54 8.28 10.00 205.38 266.99 82.82 642,316.11
5035+300.00 5.05 5.04 19.13 9.08 10.00 191.28 248.66 90.78 642,473.99
5035+320.00 0.00 11.56 5.05 16.61 10.00 50.47 65.61 166.08 642,373.52
234
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5035+340.00 0.00 16.88 0.00 28.45 10.00 0.00 0.00 284.48 642,089.04
5035+360.00 0.00 24.07 0.00 40.95 10.00 0.00 0.00 409.53 641,679.51
5035+380.00 0.00 25.51 0.00 49.57 10.00 0.00 0.00 495.74 641,183.77
5035+400.00 0.00 27.20 0.00 52.71 10.00 0.00 0.00 527.09 640,656.68
5035+420.00 0.00 25.90 0.00 53.10 10.00 0.00 0.00 531.03 640,125.65
5035+440.00 0.00 24.07 0.00 49.97 10.00 0.00 0.00 499.67 639,625.98
5035+460.00 0.00 21.01 0.00 45.08 10.00 0.00 0.00 450.75 639,175.23
5035+480.00 0.00 23.16 0.00 44.16 10.00 0.00 0.00 441.63 638,733.60
5035+500.00 0.00 26.17 0.00 49.32 10.00 0.00 0.00 493.24 638,240.36
5035+520.00 0.00 20.45 0.00 46.62 10.00 0.00 0.00 466.18 637,774.18
5035+540.00 0.00 15.26 0.00 35.71 10.00 0.00 0.00 357.13 637,417.05
5035+560.00 0.00 12.94 0.00 28.20 10.00 0.00 0.00 281.99 637,135.06
5035+580.00 0.00 13.27 0.00 26.21 10.00 0.00 0.00 262.09 636,872.97
5035+600.00 0.00 13.55 0.00 26.82 10.00 0.00 0.00 268.18 636,604.79
5035+620.00 0.00 11.49 0.00 25.04 10.00 0.00 0.00 250.36 636,354.43
5035+640.00 0.00 9.67 0.00 21.16 10.00 0.00 0.00 211.57 636,142.86
5035+660.00 0.00 7.65 0.00 17.32 10.00 0.00 0.00 173.20 635,969.66
5035+680.00 0.00 8.29 0.00 15.95 10.00 0.00 0.00 159.46 635,810.20
5035+700.00 0.00 11.84 0.00 20.13 10.00 0.00 0.00 201.32 635,608.88
5035+720.00 0.00 15.09 0.00 26.93 10.00 0.00 0.00 269.26 635,339.62
5035+740.00 0.00 13.71 0.00 28.79 10.00 0.00 0.00 287.93 635,051.69
5035+760.00 0.00 8.51 0.00 22.21 10.00 0.00 0.00 222.13 634,829.56
5035+780.00 1.33 2.89 1.33 11.39 10.00 13.30 17.29 113.91 634,732.94
5035+800.00 5.80 1.80 7.13 4.68 10.00 71.26 92.64 46.83 634,778.75
5035+820.00 2.91 1.98 8.70 3.78 10.00 87.03 113.14 37.78 634,854.11
5035+840.00 1.53 2.80 4.44 4.78 10.00 44.41 57.73 47.75 634,864.09
5035+860.00 0.94 3.51 2.48 6.31 10.00 24.78 32.21 63.05 634,833.26
5035+880.00 0.00 6.25 0.94 9.76 10.00 9.44 12.27 97.58 634,747.95
5035+900.00 0.00 11.51 0.00 17.76 10.00 0.00 0.00 177.59 634,570.36
5035+920.00 0.00 10.34 0.00 21.85 10.00 0.00 0.00 218.54 634,351.82
5035+940.00 0.00 7.93 0.00 18.27 10.00 0.00 0.00 182.70 634,169.12
5035+960.00 0.00 8.80 0.00 16.73 10.00 0.00 0.00 167.26 634,001.86
5035+980.00 0.00 17.37 0.00 26.17 10.00 0.00 0.00 261.72 633,740.14
5036+000.00 0.00 24.75 0.00 42.13 10.00 0.00 0.00 421.26 633,318.88
5036+000.00 0.00 22.97 0.00 47.73 0.00 0.00 0.00 0.00 633,318.88
5036+020.00 0.00 16.05 0.00 39.02 10.00 0.00 0.00 390.24 632,928.64
5036+040.00 0.00 7.21 0.00 23.26 10.00 0.00 0.00 232.64 632,696.00
5036+060.00 1.82 3.86 1.82 11.08 10.00 18.18 23.63 110.76 632,608.87
5036+080.00 2.09 2.80 3.91 6.67 10.00 39.05 50.77 66.67 632,592.97
5036+100.00 0.99 3.86 3.07 6.66 10.00 30.72 39.94 66.61 632,566.30
5036+120.00 0.82 4.34 1.80 8.20 10.00 18.04 23.45 81.98 632,507.77
5036+140.00 0.51 5.08 1.32 9.42 10.00 13.24 17.21 94.20 632,430.78
5036+160.00 0.00 8.50 0.51 13.58 10.00 5.05 6.57 135.75 632,301.59
5036+180.00 0.00 9.87 0.00 18.37 10.00 0.00 0.00 183.67 632,117.92
5036+200.00 0.00 12.91 0.00 22.78 10.00 0.00 0.00 227.79 631,890.13
235
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5036+220.00 0.00 12.67 0.00 25.58 10.00 0.00 0.00 255.76 631,634.37
5036+240.00 0.00 14.16 0.00 26.83 10.00 0.00 0.00 268.26 631,366.11
5036+260.00 0.00 17.35 0.00 31.50 10.00 0.00 0.00 315.04 631,051.07
5036+280.00 0.00 16.00 0.00 33.35 10.00 0.00 0.00 333.50 630,717.57
5036+300.00 0.00 16.32 0.00 32.33 10.00 0.00 0.00 323.28 630,394.29
5036+320.00 0.00 21.24 0.00 37.57 10.00 0.00 0.00 375.68 630,018.61
5036+340.00 0.00 20.36 0.00 41.61 10.00 0.00 0.00 416.08 629,602.53
5036+360.00 0.00 16.12 0.00 36.48 10.00 0.00 0.00 364.81 629,237.72
5036+360.00 0.00 17.56 0.00 33.67 0.00 0.00 0.00 0.00 629,237.72
5036+380.00 0.00 27.83 0.00 45.38 10.00 0.00 0.00 453.82 628,783.90
5036+400.00 0.00 34.77 0.00 62.59 10.00 0.00 0.00 625.94 628,157.96
5036+420.00 0.00 32.07 0.00 66.84 10.00 0.00 0.00 668.37 627,489.59
5036+440.00 0.00 28.70 0.00 60.77 10.00 0.00 0.00 607.66 626,881.93
5036+460.00 0.00 25.40 0.00 54.10 10.00 0.00 0.00 540.99 626,340.94
5036+480.00 0.00 26.86 0.00 52.27 10.00 0.00 0.00 522.66 625,818.28
5036+500.00 0.00 26.36 0.00 53.23 10.00 0.00 0.00 532.25 625,286.03
5036+500.00 0.00 23.85 0.00 50.22 0.00 0.00 0.00 0.00 625,286.03
5036+520.00 0.00 21.50 0.00 45.35 10.00 0.00 0.00 453.50 624,832.53
5036+540.00 0.00 21.40 0.00 42.90 10.00 0.00 0.00 429.00 624,403.53
5036+560.00 0.00 23.48 0.00 44.88 10.00 0.00 0.00 448.81 623,954.72
5036+580.00 0.00 20.38 0.00 43.86 10.00 0.00 0.00 438.58 623,516.14
5036+600.00 0.00 15.23 0.00 35.61 10.00 0.00 0.00 356.11 623,160.03
5036+620.00 0.00 16.88 0.00 32.11 10.00 0.00 0.00 321.11 622,838.92
5036+640.00 0.00 24.23 0.00 41.11 10.00 0.00 0.00 411.06 622,427.86
5036+660.00 0.00 25.10 0.00 49.32 10.00 0.00 0.00 493.21 621,934.65
5036+680.00 0.00 23.09 0.00 48.19 10.00 0.00 0.00 481.87 621,452.78
5036+700.00 0.00 19.24 0.00 42.33 10.00 0.00 0.00 423.29 621,029.49
5036+720.00 0.00 17.81 0.00 37.05 10.00 0.00 0.00 370.52 620,658.97
5036+740.00 0.00 18.85 0.00 36.66 10.00 0.00 0.00 366.62 620,292.35
5036+760.00 0.00 19.53 0.00 38.38 10.00 0.00 0.00 383.75 619,908.60
5036+780.00 0.00 17.96 0.00 37.48 10.00 0.00 0.00 374.82 619,533.78
5036+800.00 0.00 18.14 0.00 36.09 10.00 0.00 0.00 360.94 619,172.84
5036+820.00 0.00 19.50 0.00 37.64 10.00 0.00 0.00 376.39 618,796.45
5036+840.00 0.00 21.40 0.00 40.90 10.00 0.00 0.00 408.98 618,387.47
5036+860.00 0.00 24.19 0.00 45.58 10.00 0.00 0.00 455.84 617,931.63
5036+880.00 0.00 25.79 0.00 49.97 10.00 0.00 0.00 499.74 617,431.89
5036+900.00 0.00 27.56 0.00 53.35 10.00 0.00 0.00 533.48 616,898.41
5036+920.00 0.00 26.36 0.00 53.92 10.00 0.00 0.00 539.17 616,359.24
5036+940.00 0.00 22.61 0.00 48.97 10.00 0.00 0.00 489.70 615,869.54
5036+960.00 0.00 23.81 0.00 46.43 10.00 0.00 0.00 464.26 615,405.28
5036+980.00 0.00 20.31 0.00 44.12 10.00 0.00 0.00 441.21 614,964.07
5037+000.00 0.00 16.48 0.00 36.79 10.00 0.00 0.00 367.90 614,596.17
5037+020.00 0.00 13.12 0.00 29.60 10.00 0.00 0.00 296.00 614,300.17
5037+040.00 0.00 15.84 0.00 28.96 10.00 0.00 0.00 289.59 614,010.58
5037+060.00 0.00 18.51 0.00 34.35 10.00 0.00 0.00 343.51 613,667.07
236
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5037+080.00 0.00 13.95 0.00 32.46 10.00 0.00 0.00 324.59 613,342.48
5037+100.00 0.00 14.66 0.00 28.61 10.00 0.00 0.00 286.12 613,056.36
5037+120.00 0.00 16.45 0.00 31.11 10.00 0.00 0.00 311.13 612,745.23
5037+140.00 0.00 16.32 0.00 32.77 10.00 0.00 0.00 327.70 612,417.53
5037+160.00 0.00 14.99 0.00 31.31 10.00 0.00 0.00 313.10 612,104.43
5037+180.00 0.00 14.96 0.00 29.95 10.00 0.00 0.00 299.48 611,804.95
5037+200.00 0.00 12.86 0.00 27.82 10.00 0.00 0.00 278.21 611,526.74
5037+220.00 0.00 11.91 0.00 24.78 10.00 0.00 0.00 247.77 611,278.97
5037+240.00 0.00 14.42 0.00 26.33 10.00 0.00 0.00 263.31 611,015.66
5037+260.00 0.00 17.34 0.00 31.76 10.00 0.00 0.00 317.61 610,698.05
5037+280.00 0.00 17.68 0.00 35.02 10.00 0.00 0.00 350.21 610,347.84
5037+300.00 0.00 19.96 0.00 37.64 10.00 0.00 0.00 376.40 609,971.44
5037+320.00 0.00 22.51 0.00 42.47 10.00 0.00 0.00 424.69 609,546.75
5037+340.00 0.00 22.55 0.00 45.06 10.00 0.00 0.00 450.60 609,096.15
5037+360.00 0.00 22.89 0.00 45.44 10.00 0.00 0.00 454.39 608,641.76
5037+380.00 0.00 19.12 0.00 42.00 10.00 0.00 0.00 420.02 608,221.74
5037+400.00 0.00 15.66 0.00 34.77 10.00 0.00 0.00 347.74 607,874.00
5037+420.00 0.00 16.72 0.00 32.38 10.00 0.00 0.00 323.77 607,550.23
5037+440.00 0.00 20.76 0.00 37.48 10.00 0.00 0.00 374.76 607,175.47
5037+460.00 0.00 21.63 0.00 42.39 10.00 0.00 0.00 423.85 606,751.62
5037+480.00 0.00 19.20 0.00 40.82 10.00 0.00 0.00 408.24 606,343.38
5037+500.00 0.00 19.10 0.00 38.30 10.00 0.00 0.00 382.95 605,960.43
5037+520.00 0.00 16.16 0.00 35.26 10.00 0.00 0.00 352.56 605,607.87
5037+540.00 0.00 13.08 0.00 29.23 10.00 0.00 0.00 292.32 605,315.55
5037+560.00 0.00 18.63 0.00 31.70 10.00 0.00 0.00 317.03 604,998.52
5037+580.00 0.00 20.74 0.00 39.37 10.00 0.00 0.00 393.66 604,604.86
5037+600.00 0.00 19.70 0.00 40.44 10.00 0.00 0.00 404.41 604,200.45
5037+620.00 0.00 18.97 0.00 38.67 10.00 0.00 0.00 386.69 603,813.76
5037+640.00 0.00 22.14 0.00 41.10 10.00 0.00 0.00 411.04 603,402.72
5037+660.00 0.00 24.00 0.00 46.14 10.00 0.00 0.00 461.36 602,941.36
5037+680.00 0.00 25.56 0.00 49.56 10.00 0.00 0.00 495.56 602,445.80
5037+700.00 0.00 25.97 0.00 51.52 10.00 0.00 0.00 515.22 601,930.58
5037+720.00 0.00 28.64 0.00 54.60 10.00 0.00 0.00 546.02 601,384.56
5037+740.00 0.00 31.79 0.00 60.43 10.00 0.00 0.00 604.26 600,780.30
5037+760.00 0.00 37.55 0.00 69.34 10.00 0.00 0.00 693.38 600,086.92
5037+780.00 0.00 41.32 0.00 78.87 10.00 0.00 0.00 788.68 599,298.24
5037+800.00 0.00 41.43 0.00 82.75 10.00 0.00 0.00 827.51 598,470.73
5037+820.00 0.00 43.03 0.00 84.46 10.00 0.00 0.00 844.64 597,626.09
5037+840.00 0.00 40.49 0.00 83.52 10.00 0.00 0.00 835.23 596,790.86
5037+860.00 0.00 40.23 0.00 80.72 10.00 0.00 0.00 807.19 595,983.67
5037+880.00 0.00 40.28 0.00 80.51 10.00 0.00 0.00 805.06 595,178.61
5037+900.00 0.00 41.58 0.00 81.86 10.00 0.00 0.00 818.58 594,360.03
5037+920.00 0.00 42.05 0.00 83.63 10.00 0.00 0.00 836.29 593,523.74
5037+940.00 0.00 43.64 0.00 85.68 10.00 0.00 0.00 856.84 592,666.90
5037+960.00 0.00 45.05 0.00 88.69 10.00 0.00 0.00 886.86 591,780.04
237
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5037+980.00 0.00 44.66 0.00 89.71 10.00 0.00 0.00 897.06 590,882.98
5038+000.00 0.00 42.40 0.00 87.06 10.00 0.00 0.00 870.56 590,012.42
5038+020.00 0.00 36.71 0.00 79.11 10.00 0.00 0.00 791.09 589,221.33
5038+040.00 0.00 32.88 0.00 69.58 10.00 0.00 0.00 695.83 588,525.50
5038+060.00 0.00 31.54 0.00 64.42 10.00 0.00 0.00 644.15 587,881.35
5038+080.00 0.00 31.18 0.00 62.72 10.00 0.00 0.00 627.15 587,254.20
5038+100.00 0.00 32.54 0.00 63.72 10.00 0.00 0.00 637.18 586,617.02
5038+120.00 0.00 32.86 0.00 65.40 10.00 0.00 0.00 654.04 585,962.98
5038+140.00 0.00 34.61 0.00 67.47 10.00 0.00 0.00 674.69 585,288.29
5038+160.00 0.00 31.16 0.00 65.77 10.00 0.00 0.00 657.70 584,630.59
5038+180.00 0.00 27.92 0.00 59.08 10.00 0.00 0.00 590.79 584,039.80
5038+200.00 0.00 26.28 0.00 54.19 10.00 0.00 0.00 541.93 583,497.87
5038+220.00 0.00 24.17 0.00 50.45 10.00 0.00 0.00 504.45 582,993.42
5038+240.00 0.00 20.19 0.00 44.35 10.00 0.00 0.00 443.54 582,549.88
5038+260.00 0.00 18.43 0.00 38.61 10.00 0.00 0.00 386.13 582,163.75
5038+280.00 0.00 17.11 0.00 35.53 10.00 0.00 0.00 355.33 581,808.42
5038+300.00 0.00 14.57 0.00 31.67 10.00 0.00 0.00 316.73 581,491.69
5038+320.00 0.00 12.16 0.00 26.73 10.00 0.00 0.00 267.32 581,224.37
5038+340.00 0.00 11.07 0.00 23.23 10.00 0.00 0.00 232.32 580,992.05
5038+360.00 0.00 13.75 0.00 24.82 10.00 0.00 0.00 248.20 580,743.85
5038+380.00 0.00 15.60 0.00 29.35 10.00 0.00 0.00 293.52 580,450.33
5038+400.00 0.00 13.08 0.00 28.68 10.00 0.00 0.00 286.84 580,163.49
5038+420.00 0.00 12.29 0.00 25.37 10.00 0.00 0.00 253.72 579,909.77
5038+440.00 0.00 13.01 0.00 25.30 10.00 0.00 0.00 252.98 579,656.79
5038+460.00 0.00 15.91 0.00 28.92 10.00 0.00 0.00 289.24 579,367.55
5038+480.00 0.00 15.44 0.00 31.35 10.00 0.00 0.00 313.53 579,054.02
5038+500.00 0.00 16.41 0.00 31.85 10.00 0.00 0.00 318.51 578,735.51
5038+520.00 0.00 15.32 0.00 31.74 10.00 0.00 0.00 317.36 578,418.15
5038+540.00 0.00 16.56 0.00 31.88 10.00 0.00 0.00 318.79 578,099.36
5038+560.00 0.00 19.28 0.00 35.84 10.00 0.00 0.00 358.37 577,740.99
5038+580.00 0.00 15.82 0.00 35.10 10.00 0.00 0.00 351.02 577,389.97
5038+600.00 0.00 10.28 0.00 26.10 10.00 0.00 0.00 261.04 577,128.93
5038+620.00 0.00 9.91 0.00 20.20 10.00 0.00 0.00 201.96 576,926.97
5038+640.00 0.00 9.80 0.00 19.71 10.00 0.00 0.00 197.12 576,729.85
5038+660.00 0.00 9.99 0.00 19.79 10.00 0.00 0.00 197.86 576,531.99
5038+680.00 0.00 11.09 0.00 21.07 10.00 0.00 0.00 210.72 576,321.27
5038+700.00 0.00 10.17 0.00 21.26 10.00 0.00 0.00 212.58 576,108.69
5038+720.00 0.00 12.32 0.00 22.49 10.00 0.00 0.00 224.88 575,883.81
5038+740.00 0.00 18.31 0.00 30.63 10.00 0.00 0.00 306.25 575,577.56
5038+760.00 0.00 20.87 0.00 39.18 10.00 0.00 0.00 391.82 575,185.74
5038+780.00 0.00 21.05 0.00 41.93 10.00 0.00 0.00 419.26 574,766.48
5038+800.00 0.00 23.57 0.00 44.63 10.00 0.00 0.00 446.27 574,320.21
5038+820.00 0.00 24.76 0.00 48.34 10.00 0.00 0.00 483.35 573,836.86
5038+840.00 0.00 25.27 0.00 50.03 10.00 0.00 0.00 500.29 573,336.57
5038+860.00 0.00 25.01 0.00 50.28 10.00 0.00 0.00 502.76 572,833.81
238
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5038+880.00 0.00 26.00 0.00 51.01 10.00 0.00 0.00 510.08 572,323.73
5038+900.00 0.00 24.06 0.00 50.06 10.00 0.00 0.00 500.55 571,823.18
5038+920.00 0.00 19.87 0.00 43.92 10.00 0.00 0.00 439.20 571,383.98
5038+940.00 0.00 17.29 0.00 37.15 10.00 0.00 0.00 371.51 571,012.47
5038+960.00 0.00 17.44 0.00 34.73 10.00 0.00 0.00 347.29 570,665.18
5038+980.00 0.00 20.76 0.00 38.21 10.00 0.00 0.00 382.06 570,283.12
5039+000.00 0.00 21.06 0.00 41.82 10.00 0.00 0.00 418.18 569,864.94
5039+020.00 0.00 21.03 0.00 42.09 10.00 0.00 0.00 420.85 569,444.09
5039+040.00 0.00 21.86 0.00 42.89 10.00 0.00 0.00 428.88 569,015.21
5039+060.00 0.00 23.28 0.00 45.14 10.00 0.00 0.00 451.36 568,563.85
5039+080.00 0.00 24.93 0.00 48.21 10.00 0.00 0.00 482.07 568,081.78
5039+100.00 0.00 30.36 0.00 55.29 10.00 0.00 0.00 552.90 567,528.88
5039+120.00 0.00 30.48 0.00 60.84 10.00 0.00 0.00 608.42 566,920.46
5039+140.00 0.00 25.42 0.00 55.90 10.00 0.00 0.00 559.03 566,361.43
5039+160.00 0.00 28.73 0.00 54.16 10.00 0.00 0.00 541.56 565,819.87
5039+180.00 0.00 30.96 0.00 59.69 10.00 0.00 0.00 596.93 565,222.94
5039+200.00 0.00 25.29 0.00 56.24 10.00 0.00 0.00 562.44 564,660.50
5039+220.00 0.00 21.00 0.00 46.28 10.00 0.00 0.00 462.82 564,197.68
5039+240.00 0.00 21.57 0.00 42.57 10.00 0.00 0.00 425.71 563,771.97
5039+260.00 0.00 22.32 0.00 43.90 10.00 0.00 0.00 438.96 563,333.01
5039+280.00 0.00 17.70 0.00 40.02 10.00 0.00 0.00 400.23 562,932.78
5039+300.00 0.00 16.02 0.00 33.72 10.00 0.00 0.00 337.22 562,595.56
5039+301.44 0.00 15.88 0.00 31.90 0.72 0.00 0.00 22.95 562,572.62
5039+320.00 0.00 13.66 0.00 29.54 9.28 0.00 0.00 274.12 562,298.50
5039+340.00 0.00 11.35 0.00 25.02 10.00 0.00 0.00 250.16 562,048.34
5039+351.44 0.00 11.76 0.00 23.11 5.72 0.00 0.00 132.18 561,916.15
5039+360.00 0.00 11.91 0.00 23.66 4.28 0.00 0.00 101.29 561,814.86
5039+380.00 0.38 9.02 0.38 20.93 10.00 3.80 4.94 209.27 561,610.53
5039+400.00 1.12 8.04 1.50 17.06 10.00 15.02 19.53 170.58 561,459.48
5039+420.00 0.94 7.20 2.06 15.24 10.00 20.59 26.77 152.41 561,333.83
5039+440.00 0.00 8.66 0.94 15.87 10.00 9.37 12.18 158.65 561,187.36
5039+441.77 0.00 8.66 0.00 17.32 0.88 0.00 0.00 15.29 561,172.07
5039+460.00 0.00 8.76 0.00 17.41 9.12 0.00 0.00 158.75 561,013.33
5039+480.00 0.00 9.18 0.00 17.94 10.00 0.00 0.00 179.35 560,833.98
5039+491.77 0.00 10.78 0.00 19.96 5.88 0.00 0.00 117.41 560,716.57
5039+500.00 0.00 11.80 0.00 22.57 4.12 0.00 0.00 92.94 560,623.63
5039+520.00 0.00 14.20 0.00 26.00 10.00 0.00 0.00 259.95 560,363.68
5039+540.00 0.00 12.14 0.00 26.34 10.00 0.00 0.00 263.42 560,100.26
5039+560.00 0.00 11.99 0.00 24.14 10.00 0.00 0.00 241.35 559,858.91
5039+580.00 0.00 15.75 0.00 27.74 10.00 0.00 0.00 277.44 559,581.47
5039+600.00 0.00 15.57 0.00 31.33 10.00 0.00 0.00 313.25 559,268.22
5039+620.00 0.00 12.60 0.00 28.17 10.00 0.00 0.00 281.74 558,986.48
5039+640.00 0.00 14.21 0.00 26.81 10.00 0.00 0.00 268.09 558,718.39
5039+660.00 0.00 17.11 0.00 31.31 10.00 0.00 0.00 313.14 558,405.25
5039+680.00 0.00 16.80 0.00 33.90 10.00 0.00 0.00 339.00 558,066.25
239
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5039+700.00 0.00 9.82 0.00 26.61 10.00 0.00 0.00 266.10 557,800.15
5039+720.00 0.00 9.54 0.00 19.35 10.00 0.00 0.00 193.53 557,606.62
5039+740.00 0.00 11.17 0.00 20.71 10.00 0.00 0.00 207.11 557,399.51
5039+760.00 0.00 14.48 0.00 25.65 10.00 0.00 0.00 256.50 557,143.01
5039+780.00 0.00 15.31 0.00 29.78 10.00 0.00 0.00 297.83 556,845.18
5039+800.00 0.00 13.68 0.00 28.99 10.00 0.00 0.00 289.87 556,555.31
5039+820.00 0.00 10.61 0.00 24.29 10.00 0.00 0.00 242.89 556,312.42
5039+840.00 0.00 6.57 0.00 17.18 10.00 0.00 0.00 171.79 556,140.63
5039+860.00 0.00 6.99 0.00 13.56 10.00 0.00 0.00 135.59 556,005.04
5039+880.00 0.00 11.28 0.00 18.27 10.00 0.00 0.00 182.71 555,822.33
5039+900.00 0.00 10.39 0.00 21.67 10.00 0.00 0.00 216.74 555,605.59
5039+920.00 0.00 10.26 0.00 20.65 10.00 0.00 0.00 206.54 555,399.05
5039+940.00 0.00 12.61 0.00 22.87 10.00 0.00 0.00 228.71 555,170.34
5039+960.00 0.00 14.18 0.00 26.78 10.00 0.00 0.00 267.83 554,902.51
5039+980.00 0.00 11.43 0.00 25.60 10.00 0.00 0.00 256.00 554,646.51
5040+000.00 0.00 11.41 0.00 22.84 10.00 0.00 0.00 228.38 554,418.13
5040+020.00 0.00 11.01 0.00 22.43 10.00 0.00 0.00 224.27 554,193.86
5040+040.00 1.03 6.78 1.03 17.79 10.00 10.34 13.44 177.89 554,029.42
5040+060.00 0.81 4.68 1.85 11.45 10.00 18.45 23.99 114.54 553,938.86
5040+080.00 0.89 3.78 1.71 8.45 10.00 17.05 22.17 84.54 553,876.49
5040+100.00 9.46 1.99 10.36 5.77 10.00 103.57 134.64 57.65 553,953.48
5040+120.00 6.73 3.01 16.20 5.00 10.00 161.97 210.56 50.02 554,114.02
5040+140.00 0.00 12.65 6.73 15.66 10.00 67.34 87.54 156.60 554,044.96
5040+160.00 0.00 14.07 0.00 26.72 10.00 0.00 0.00 267.15 553,777.81
5040+180.00 0.00 12.65 0.00 26.72 10.00 0.00 0.00 267.20 553,510.61
5040+200.00 0.00 11.16 0.00 23.81 10.00 0.00 0.00 238.10 553,272.51
5040+220.00 0.00 15.05 0.00 26.21 10.00 0.00 0.00 262.05 553,010.46
5040+240.00 0.00 18.63 0.00 33.67 10.00 0.00 0.00 336.73 552,673.73
5040+260.00 0.00 18.05 0.00 36.68 10.00 0.00 0.00 366.79 552,306.94
5040+280.00 0.00 19.96 0.00 38.01 10.00 0.00 0.00 380.11 551,926.83
5040+300.00 0.00 22.91 0.00 42.87 10.00 0.00 0.00 428.65 551,498.18
5040+320.00 0.00 15.05 0.00 37.96 10.00 0.00 0.00 379.58 551,118.60
5040+340.00 0.00 17.54 0.00 32.59 10.00 0.00 0.00 325.90 550,792.70
5040+360.00 0.00 26.82 0.00 44.36 10.00 0.00 0.00 443.62 550,349.08
5040+380.00 0.00 36.66 0.00 63.48 10.00 0.00 0.00 634.77 549,714.31
5040+400.00 0.00 40.15 0.00 76.81 10.00 0.00 0.00 768.07 548,946.24
5040+420.00 0.00 37.95 0.00 78.10 10.00 0.00 0.00 781.04 548,165.20
5040+440.00 0.00 39.60 0.00 77.55 10.00 0.00 0.00 775.49 547,389.71
5040+460.00 0.00 67.58 0.00 107.17 10.00 0.00 0.00 1071.73 546,317.98
5040+480.00 0.00 95.67 0.00 163.25 10.00 0.00 0.00 1632.50 544,685.48
5040+500.00 0.00 87.87 0.00 183.54 10.00 0.00 0.00 1835.41 542,850.07
5040+520.00 0.00 68.46 0.00 156.33 10.00 0.00 0.00 1563.31 541,286.76
5040+540.00 0.00 49.93 0.00 118.40 10.00 0.00 0.00 1183.95 540,102.81
5040+540.00 0.00 0.00 0.00 49.93 0.00 0.00 0.00 0.00 540,102.81
5040+540.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 540,102.81
240
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5040+560.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 540,102.81
5040+571.00 0.00 0.00 0.00 0.00 5.50 0.00 0.00 0.00 540,102.81
5040+571.00 0.00 53.12 0.00 53.12 0.00 0.00 0.00 0.00 540,102.81
5040+571.00 0.00 48.49 0.00 101.61 0.00 0.00 0.00 0.05 540,102.76
5040+580.00 0.00 51.36 0.00 99.85 4.50 0.00 0.00 449.26 539,653.50
5040+600.00 0.00 56.58 0.00 107.94 10.00 0.00 0.00 1079.40 538,574.10
5040+620.00 0.00 56.17 0.00 112.75 10.00 0.00 0.00 1127.51 537,446.59
5040+640.00 0.00 54.18 0.00 110.34 10.00 0.00 0.00 1103.44 536,343.15
5040+660.00 0.00 52.07 0.00 106.24 10.00 0.00 0.00 1062.43 535,280.72
5040+680.00 0.00 50.50 0.00 102.57 10.00 0.00 0.00 1025.72 534,255.00
5040+700.00 0.00 42.64 0.00 93.15 10.00 0.00 0.00 931.46 533,323.54
5040+720.00 0.00 33.35 0.00 75.99 10.00 0.00 0.00 759.93 532,563.61
5040+740.00 0.00 34.19 0.00 67.54 10.00 0.00 0.00 675.36 531,888.25
5040+760.00 0.00 44.34 0.00 78.53 10.00 0.00 0.00 785.26 531,102.99
5040+780.00 0.00 51.07 0.00 95.41 10.00 0.00 0.00 954.06 530,148.93
5040+800.00 0.00 48.40 0.00 99.46 10.00 0.00 0.00 994.61 529,154.32
5040+820.00 0.00 49.76 0.00 98.15 10.00 0.00 0.00 981.51 528,172.81
5040+840.00 0.00 55.27 0.00 105.03 10.00 0.00 0.00 1050.26 527,122.55
5040+860.00 0.00 51.21 0.00 106.49 10.00 0.00 0.00 1064.85 526,057.70
5040+880.00 0.00 46.12 0.00 97.34 10.00 0.00 0.00 973.36 525,084.34
5040+900.00 0.00 43.93 0.00 90.06 10.00 0.00 0.00 900.56 524,183.78
5040+920.00 0.00 41.43 0.00 85.36 10.00 0.00 0.00 853.60 523,330.18
5040+940.00 0.00 31.14 0.00 72.57 10.00 0.00 0.00 725.69 522,604.49
5040+960.00 0.00 28.68 0.00 59.82 10.00 0.00 0.00 598.24 522,006.25
5040+980.00 0.00 36.32 0.00 65.00 10.00 0.00 0.00 649.96 521,356.29
5041+000.00 0.00 46.29 0.00 82.60 10.00 0.00 0.00 826.02 520,530.27
5041+020.00 0.00 49.41 0.00 95.70 10.00 0.00 0.00 956.98 519,573.29
5041+040.00 0.00 48.95 0.00 98.37 10.00 0.00 0.00 983.65 518,589.64
5041+060.00 0.00 49.68 0.00 98.63 10.00 0.00 0.00 986.34 517,603.30
5041+080.00 0.00 49.58 0.00 99.26 10.00 0.00 0.00 992.58 516,610.72
5041+100.00 0.00 45.09 0.00 94.67 10.00 0.00 0.00 946.68 515,664.04
5041+120.00 0.00 39.70 0.00 84.79 10.00 0.00 0.00 847.94 514,816.10
5041+140.00 0.00 35.93 0.00 75.63 10.00 0.00 0.00 756.31 514,059.79
5041+160.00 0.00 37.95 0.00 73.87 10.00 0.00 0.00 738.74 513,321.05
5041+180.00 0.00 40.69 0.00 78.63 10.00 0.00 0.00 786.33 512,534.72
5041+200.00 0.00 46.69 0.00 87.38 10.00 0.00 0.00 873.77 511,660.95
5041+200.00 0.00 47.73 0.00 94.43 0.00 0.00 0.00 0.00 511,660.95
5041+220.00 0.00 49.71 0.00 97.45 10.00 0.00 0.00 974.46 510,686.49
5041+235.00 0.00 42.97 0.00 92.68 7.50 0.00 0.00 695.10 509,991.39
5041+235.00 0.00 0.00 0.00 42.97 0.00 0.00 0.00 0.00 509,991.39
5041+235.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 509,991.39
5041+240.00 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 509,991.39
5041+250.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 509,991.39
5041+250.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 509,991.39
5041+260.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 509,991.39
241
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5041+268.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 509,991.39
5041+268.00 0.00 34.78 0.00 34.78 0.00 0.00 0.00 0.00 509,991.39
5041+268.00 0.00 29.43 0.00 64.22 0.00 0.00 0.00 0.03 509,991.36
5041+280.00 0.00 29.61 0.00 59.04 6.00 0.00 0.00 354.23 509,637.13
5041+300.00 0.00 39.42 0.00 69.03 10.00 0.00 0.00 690.30 508,946.83
5041+320.00 0.00 44.62 0.00 84.04 10.00 0.00 0.00 840.39 508,106.44
5041+340.00 0.00 45.58 0.00 90.19 10.00 0.00 0.00 901.94 507,204.50
5041+360.00 0.00 45.69 0.00 91.26 10.00 0.00 0.00 912.61 506,291.89
5041+370.00 0.00 45.86 0.00 91.54 5.00 0.00 0.00 457.72 505,834.17
5041+370.00 0.00 0.00 0.00 45.86 0.00 0.00 0.00 0.00 505,834.17
5041+370.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 505,834.17
5041+380.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 505,834.17
5041+400.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 505,834.17
5041+402.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 505,834.17
5041+402.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 505,834.17
5041+402.00 0.00 53.09 0.00 53.09 0.00 0.00 0.00 0.00 505,834.17
5041+402.00 0.00 46.75 0.00 99.84 0.00 0.00 0.00 0.05 505,834.12
5041+420.00 0.00 44.64 0.00 91.40 9.00 0.00 0.00 822.53 505,011.59
5041+440.00 0.00 39.66 0.00 84.30 10.00 0.00 0.00 843.04 504,168.55
5041+460.00 0.00 41.86 0.00 81.52 10.00 0.00 0.00 815.23 503,353.32
5041+480.00 0.00 42.22 0.00 84.08 10.00 0.00 0.00 840.84 502,512.48
5041+500.00 0.00 40.11 0.00 82.33 10.00 0.00 0.00 823.26 501,689.22
5041+520.00 0.00 37.44 0.00 77.55 10.00 0.00 0.00 775.46 500,913.76
5041+540.00 0.00 26.99 0.00 64.43 10.00 0.00 0.00 644.31 500,269.45
5041+560.00 0.00 28.42 0.00 55.41 10.00 0.00 0.00 554.07 499,715.38
5041+580.00 0.00 35.19 0.00 63.61 10.00 0.00 0.00 636.08 499,079.30
5041+600.00 0.00 36.53 0.00 71.72 10.00 0.00 0.00 717.19 498,362.11
5041+620.00 0.00 33.57 0.00 70.10 10.00 0.00 0.00 700.98 497,661.13
5041+640.00 0.00 30.68 0.00 64.25 10.00 0.00 0.00 642.51 497,018.62
5041+660.00 0.00 26.26 0.00 56.94 10.00 0.00 0.00 569.42 496,449.20
5041+680.00 0.00 20.00 0.00 46.26 10.00 0.00 0.00 462.59 495,986.61
5041+700.00 0.00 17.95 0.00 37.95 10.00 0.00 0.00 379.47 495,607.14
5041+720.00 0.00 19.49 0.00 37.44 10.00 0.00 0.00 374.37 495,232.77
5041+740.00 0.00 16.85 0.00 36.34 10.00 0.00 0.00 363.36 494,869.41
5041+760.00 0.00 13.67 0.00 30.52 10.00 0.00 0.00 305.15 494,564.26
5041+780.00 0.00 12.02 0.00 25.69 10.00 0.00 0.00 256.86 494,307.40
5041+800.00 0.00 7.72 0.00 19.74 10.00 0.00 0.00 197.43 494,109.97
5041+820.00 0.00 8.21 0.00 15.93 10.00 0.00 0.00 159.33 493,950.64
5041+840.00 0.00 9.32 0.00 17.53 10.00 0.00 0.00 175.28 493,775.36
5041+860.00 0.00 10.00 0.00 19.31 10.00 0.00 0.00 193.14 493,582.22
5041+880.00 0.00 12.24 0.00 22.24 10.00 0.01 0.01 222.36 493,359.88
5041+900.00 0.00 9.05 0.00 21.29 10.00 0.02 0.03 212.94 493,146.96
5041+920.00 0.00 9.03 0.00 18.08 10.00 0.03 0.04 180.81 492,966.19
5041+940.00 0.00 7.46 0.01 16.48 10.00 0.05 0.07 164.83 492,801.43
5041+960.00 0.01 6.96 0.01 14.41 10.00 0.10 0.13 144.13 492,657.43
242
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5041+980.00 0.04 6.66 0.05 13.62 10.00 0.45 0.59 136.16 492,521.85
5042+000.00 0.03 9.15 0.06 15.81 10.00 0.64 0.83 158.11 492,364.57
5042+002.37 0.02 9.30 0.05 18.46 1.18 0.06 0.08 21.86 492,342.79
5042+020.00 0.01 10.39 0.03 19.69 8.82 0.30 0.39 173.60 492,169.58
5042+032.37 0.01 10.70 0.02 21.10 6.18 0.14 0.18 130.46 492,039.30
5042+040.00 0.02 10.81 0.03 21.52 3.82 0.11 0.14 82.09 491,957.35
5042+060.00 0.03 6.80 0.05 17.61 10.00 0.47 0.61 176.11 491,781.85
5042+080.00 0.03 5.85 0.06 12.65 10.00 0.61 0.79 126.53 491,656.11
5042+100.00 0.01 7.94 0.04 13.80 10.00 0.41 0.53 137.97 491,518.68
5042+120.00 0.01 6.70 0.02 14.65 10.00 0.24 0.31 146.47 491,372.52
5042+120.89 0.01 6.58 0.03 13.28 0.44 0.01 0.01 5.90 491,366.63
5042+140.00 0.03 4.13 0.05 10.70 9.56 0.44 0.57 102.24 491,264.96
5042+150.89 0.00 4.32 0.04 8.45 5.44 0.20 0.25 45.98 491,219.23
5042+160.00 0.00 4.48 0.00 8.80 4.56 0.01 0.02 40.10 491,179.15
5042+180.00 0.00 3.41 0.00 7.89 10.00 0.00 0.00 78.86 491,100.29
5042+200.00 0.69 1.95 0.69 5.36 10.00 6.91 8.98 53.55 491,055.72
5042+220.00 0.00 3.72 0.69 5.67 10.00 6.91 8.98 56.71 491,007.99
5042+240.00 0.00 7.00 0.00 10.72 10.00 0.02 0.03 107.19 490,900.83
5042+260.00 0.00 8.99 0.00 15.99 10.00 0.02 0.03 159.91 490,740.95
5042+280.00 0.00 9.60 0.00 18.59 10.00 0.00 0.00 185.88 490,555.07
5042+300.00 0.00 7.21 0.00 16.80 10.00 0.00 0.00 168.03 490,387.04
5042+320.00 0.00 4.86 0.00 12.07 10.00 0.00 0.00 120.65 490,266.39
5042+340.00 0.64 5.65 0.64 10.51 10.00 6.41 8.33 105.10 490,169.62
5042+360.00 0.00 7.21 0.64 12.87 10.00 6.41 8.33 128.66 490,049.29
5042+380.00 0.00 4.25 0.00 11.46 10.00 0.00 0.00 114.58 489,934.71
5042+400.00 0.68 4.20 0.68 8.45 10.00 6.75 8.78 84.48 489,859.01
5042+420.00 0.00 4.86 0.68 9.06 10.00 6.75 8.78 90.64 489,777.14
5042+440.00 0.00 8.17 0.00 13.03 10.00 0.00 0.00 130.29 489,646.85
5042+460.00 0.00 7.65 0.00 15.81 10.00 0.00 0.00 158.13 489,488.72
5042+460.03 0.00 7.64 0.00 15.29 0.01 0.00 0.00 0.22 489,488.50
5042+470.00 0.00 6.14 0.00 13.78 4.99 0.00 0.00 68.71 489,419.80
5042+480.00 0.57 4.93 0.57 11.07 5.00 2.87 3.73 55.36 489,368.17
5042+480.03 0.58 4.93 1.15 9.86 0.01 0.02 0.02 0.14 489,368.05
5042+490.00 0.74 4.25 1.31 9.18 4.99 6.55 8.52 45.76 489,330.81
5042+500.00 0.88 3.74 1.62 7.99 5.00 8.10 10.53 39.93 489,301.41
5042+510.00 0.00 4.38 0.88 8.12 5.00 4.41 5.73 40.59 489,266.55
5042+520.00 0.00 5.03 0.00 9.41 5.00 0.00 0.00 47.05 489,219.50
5042+530.00 0.00 5.18 0.00 10.21 5.00 0.00 0.00 51.04 489,168.47
5042+540.00 0.00 5.75 0.00 10.93 5.00 0.00 0.00 54.64 489,113.83
5042+550.00 0.00 6.15 0.00 11.90 5.00 0.00 0.00 59.48 489,054.35
5042+560.00 0.04 6.70 0.04 12.85 5.00 0.18 0.23 64.24 488,990.34
5042+570.00 0.00 9.49 0.04 16.18 5.00 0.18 0.23 80.92 488,909.65
5042+580.00 0.00 12.74 0.00 22.23 5.00 0.00 0.00 111.15 488,798.51
5042+590.00 0.00 13.04 0.00 25.79 5.00 0.00 0.00 128.94 488,669.57
5042+600.00 0.00 14.13 0.00 27.17 5.00 0.02 0.02 135.86 488,533.73
243
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5042+600.00 0.00 17.30 0.00 31.43 0.00 0.00 0.00 0.00 488,533.73
5042+610.00 0.00 19.23 0.00 36.53 5.00 0.00 0.00 182.67 488,351.07
5042+620.00 0.00 16.44 0.00 35.67 5.00 0.00 0.00 178.34 488,172.73
5042+630.00 0.86 5.84 0.86 22.27 5.00 4.31 5.60 111.37 488,066.97
5042+640.00 0.94 7.01 1.80 12.85 5.00 8.99 11.68 64.26 488,014.39
5042+650.00 0.36 6.24 1.30 13.25 5.00 6.49 8.43 66.26 487,956.57
5042+660.00 0.34 6.04 0.70 12.28 5.00 3.49 4.53 61.40 487,899.70
5042+680.00 0.19 5.95 0.53 12.00 10.00 5.29 6.88 119.96 487,786.62
5042+700.00 0.35 6.04 0.54 11.99 10.00 5.42 7.05 119.90 487,673.77
5042+720.00 0.00 9.17 0.35 15.20 10.00 3.48 4.52 152.04 487,526.25
5042+740.00 0.00 12.95 0.00 22.12 10.00 0.00 0.00 221.20 487,305.05
5042+760.00 0.64 7.92 0.64 20.87 10.00 6.43 8.36 208.74 487,104.67
5042+780.00 0.00 7.61 0.64 15.53 10.00 6.43 8.36 155.32 486,957.71
5042+800.00 0.01 8.61 0.01 16.22 10.00 0.06 0.08 162.20 486,795.59
5042+800.00 0.01 8.61 0.01 17.22 0.00 0.00 0.00 0.00 486,795.59
5042+820.00 0.01 10.93 0.01 19.54 10.00 0.14 0.18 195.40 486,600.37
5042+840.00 0.00 10.95 0.01 21.88 10.00 0.08 0.10 218.78 486,381.69
5042+860.00 0.00 12.37 0.00 23.32 10.00 0.00 0.00 233.22 486,148.47
5042+862.97 0.00 11.70 0.00 24.08 1.48 0.00 0.00 35.76 486,112.72
5042+880.00 0.00 8.22 0.00 19.92 8.52 0.02 0.02 169.64 485,943.10
5042+900.00 0.00 9.22 0.00 17.44 10.00 0.02 0.03 174.43 485,768.69
5042+920.00 0.00 14.79 0.00 24.01 10.00 0.00 0.00 240.09 485,528.60
5042+940.00 0.00 14.27 0.00 29.06 10.00 0.00 0.00 290.55 485,238.05
5042+960.00 0.00 16.26 0.00 30.53 10.00 0.00 0.00 305.30 484,932.75
5042+980.00 0.00 14.85 0.00 31.11 10.00 0.00 0.00 311.12 484,621.63
5043+000.00 0.00 20.21 0.00 35.06 10.00 0.00 0.00 350.63 484,271.00
TABLA 26 CÁLCULO DE CURVA MASA DEL TRAMO DEL 5071+500 – 6006+000
244
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5071+660.00 0.0000 16.4720 0.00 32.95 0.00 0.00 0.00 0.02 1,298,396.22
5071+680.00 0.0000 15.8670 0.00 32.34 10.00 0.00 0.00 323.37 1,298,072.85
5071+700.00 0.0000 15.9280 0.00 31.80 10.00 0.00 0.00 317.95 1,297,754.90
5071+720.00 0.0000 12.7050 0.00 28.63 10.00 0.00 0.00 286.33 1,297,468.57
5071+740.00 0.0000 12.1130 0.00 24.82 10.00 0.00 0.00 248.18 1,297,220.39
5071+760.00 0.0000 20.7980 0.00 32.91 10.00 0.00 0.00 329.11 1,296,891.28
5071+780.00 0.0000 20.5030 0.00 41.30 10.00 0.00 0.00 413.01 1,296,478.27
5071+800.00 0.0000 15.6350 0.00 36.14 10.00 0.00 0.00 361.38 1,296,116.89
5071+820.00 0.0000 13.8470 0.00 29.48 10.00 0.00 0.00 294.82 1,295,822.07
5071+840.00 0.0000 16.3400 0.00 30.19 10.00 0.00 0.00 301.87 1,295,520.20
5071+860.00 5.3450 0.1790 5.35 16.52 10.00 53.45 69.49 165.19 1,295,424.50
5071+880.00 3.8310 0.1860 9.18 0.37 10.00 91.76 119.29 3.65 1,295,540.13
5071+900.00 0.0000 20.4640 3.83 20.65 10.00 38.31 49.80 206.50 1,295,383.44
5071+920.00 0.0000 36.0740 0.00 56.54 10.00 0.00 0.00 565.38 1,294,818.06
5071+940.00 0.0000 39.6380 0.00 75.71 10.00 0.00 0.00 757.12 1,294,060.94
5071+960.00 0.0000 34.5980 0.00 74.24 10.00 0.00 0.00 742.36 1,293,318.58
5071+980.00 0.0000 32.4420 0.00 67.04 10.00 0.00 0.00 670.40 1,292,648.18
5072+000.00 0.0000 43.2850 0.00 75.73 10.00 0.00 0.00 757.27 1,291,890.91
5072+020.00 0.0000 44.6750 0.00 87.96 10.00 0.00 0.00 879.60 1,291,011.31
5072+040.00 0.0000 37.2710 0.00 81.95 10.00 0.00 0.00 819.46 1,290,191.85
5072+060.00 0.0000 29.0060 0.00 66.28 10.00 0.00 0.00 662.77 1,289,529.08
5072+080.00 0.0000 30.4080 0.00 59.41 10.00 0.00 0.00 594.14 1,288,934.94
5072+100.00 0.0000 29.8730 0.00 60.28 10.00 0.00 0.00 602.81 1,288,332.13
5072+120.00 0.0000 41.0770 0.00 70.95 10.00 0.00 0.00 709.50 1,287,622.63
5072+140.00 0.0000 42.7540 0.00 83.83 10.00 0.00 0.00 838.31 1,286,784.32
5072+145.35 0.0000 42.5960 0.00 85.35 2.67 0.00 0.00 228.18 1,286,556.13
5072+160.00 0.0000 37.3200 0.00 79.92 7.33 0.00 0.00 585.50 1,285,970.63
5072+165.35 0.0000 33.8710 0.00 71.19 2.67 0.00 0.00 190.33 1,285,780.30
5072+175.00 0.0000 28.6060 0.00 62.48 4.83 0.00 0.00 301.55 1,285,478.75
5072+180.00 0.0000 30.3300 0.00 58.94 2.50 0.00 0.00 147.34 1,285,331.41
5072+185.00 0.0000 32.2760 0.00 62.61 2.50 0.00 0.00 156.52 1,285,174.90
5072+195.00 0.0000 36.0640 0.00 68.34 5.00 0.00 0.00 341.70 1,284,833.20
5072+200.00 0.0000 34.9130 0.00 70.98 2.50 0.00 0.00 177.44 1,284,655.76
5072+205.00 0.0000 34.0760 0.00 68.99 2.50 0.00 0.00 172.47 1,284,483.28
5072+215.00 0.0000 34.1800 0.00 68.26 5.00 0.00 0.00 341.28 1,284,142.00
5072+220.00 0.0000 35.2970 0.00 69.48 2.50 0.00 0.00 173.69 1,283,968.31
5072+225.00 0.0000 36.3780 0.00 71.68 2.50 0.00 0.00 179.19 1,283,789.12
5072+235.00 0.0000 37.8450 0.00 74.22 5.00 0.00 0.00 371.12 1,283,418.01
5072+240.00 0.0000 36.7120 0.00 74.56 2.50 0.00 0.00 186.39 1,283,231.62
5072+245.00 0.0000 35.4430 0.00 72.16 2.50 0.00 0.00 180.39 1,283,051.23
5072+255.00 0.0000 31.1130 0.00 66.56 5.00 0.00 0.00 332.78 1,282,718.45
5072+260.00 0.0000 26.8480 0.00 57.96 2.50 0.00 0.00 144.90 1,282,573.55
5072+265.00 0.0000 23.2330 0.00 50.08 2.50 0.00 0.00 125.20 1,282,448.34
5072+275.00 0.0000 21.5150 0.00 44.75 5.00 0.00 0.00 223.74 1,282,224.60
5072+280.00 0.0000 25.1440 0.00 46.66 2.50 0.00 0.00 116.65 1,282,107.96
245
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5072+285.00 0.0000 28.7550 0.00 53.90 2.50 0.00 0.00 134.75 1,281,973.21
5072+295.00 0.0000 35.0720 0.00 63.83 5.00 0.00 0.00 319.14 1,281,654.07
5072+300.00 0.0000 36.8020 0.00 71.87 2.50 0.00 0.00 179.69 1,281,474.39
5072+305.00 0.0000 38.8590 0.00 75.66 2.50 0.00 0.00 189.15 1,281,285.24
5072+315.00 0.0000 41.5650 0.00 80.42 5.00 0.00 0.00 402.12 1,280,883.12
5072+320.00 0.0000 42.3490 0.00 83.91 2.50 0.00 0.00 209.79 1,280,673.33
5072+325.00 0.0000 43.4710 0.00 85.82 2.50 0.00 0.00 214.55 1,280,458.78
5072+335.00 0.0000 43.5700 0.00 87.04 5.00 0.00 0.00 435.21 1,280,023.58
5072+340.00 0.0000 40.6970 0.00 84.27 2.50 0.00 0.00 210.67 1,279,812.91
5072+360.00 0.0000 34.1330 0.00 74.83 10.00 0.00 0.00 748.30 1,279,064.61
5072+380.00 0.0000 43.2380 0.00 77.37 10.00 0.00 0.00 773.71 1,278,290.90
5072+400.00 0.0000 43.6300 0.00 86.87 10.00 0.00 0.00 868.68 1,277,422.22
5072+420.00 0.0000 39.0690 0.00 82.70 10.00 0.00 0.00 826.99 1,276,595.23
5072+440.00 0.0000 39.3840 0.00 78.45 10.00 0.00 0.00 784.53 1,275,810.70
5072+460.00 0.0000 33.8360 0.00 73.22 10.00 0.00 0.00 732.20 1,275,078.50
5072+480.00 0.0000 25.7100 0.00 59.55 10.00 0.00 0.00 595.46 1,274,483.04
5072+500.00 0.0000 26.9420 0.00 52.65 10.00 0.00 0.00 526.52 1,273,956.52
5072+520.00 0.0000 19.8750 0.00 46.82 10.00 0.00 0.00 468.17 1,273,488.35
5072+540.00 0.7740 7.4670 0.77 27.34 10.00 7.74 10.06 273.42 1,273,224.99
5072+560.00 0.0000 14.8630 0.77 22.33 10.00 7.74 10.06 223.30 1,273,011.75
5072+580.00 0.0000 20.5390 0.00 35.40 10.00 0.00 0.00 354.02 1,272,657.73
5072+600.00 0.0000 21.0200 0.00 41.56 10.00 0.00 0.00 415.59 1,272,242.14
5072+620.00 0.0000 23.1710 0.00 44.19 10.00 0.00 0.00 441.91 1,271,800.23
5072+640.00 0.0000 26.3210 0.00 49.49 10.00 0.00 0.00 494.92 1,271,305.31
5072+660.00 0.0000 29.5590 0.00 55.88 10.00 0.00 0.00 558.80 1,270,746.51
5072+660.00 0.0000 39.0950 0.00 68.65 0.00 0.00 0.00 0.00 1,270,746.51
5072+680.00 0.0000 32.4530 0.00 71.55 10.00 0.00 0.00 715.48 1,270,031.03
5072+700.00 0.0000 30.3350 0.00 62.79 10.00 0.00 0.00 627.88 1,269,403.15
5072+720.00 0.0000 23.9650 0.00 54.30 10.00 0.00 0.00 543.00 1,268,860.15
5072+740.00 0.0000 18.0020 0.00 41.97 10.00 0.00 0.00 419.67 1,268,440.48
5072+760.00 0.0000 28.1320 0.00 46.13 10.00 0.00 0.00 461.34 1,267,979.14
5072+760.00 0.0000 21.9650 0.00 50.10 0.00 0.00 0.00 0.00 1,267,979.14
5072+780.00 0.0000 25.0610 0.00 47.03 10.00 0.00 0.00 470.26 1,267,508.88
5072+795.00 0.0000 23.1880 0.00 48.25 7.50 0.00 0.00 361.87 1,267,147.02
5072+800.00 0.0000 24.5390 0.00 47.73 2.50 0.00 0.00 119.32 1,267,027.70
5072+820.00 0.0000 25.5480 0.00 50.09 10.00 0.00 0.00 500.87 1,266,526.83
5072+840.00 0.0000 19.6140 0.00 45.16 10.00 0.00 0.00 451.62 1,266,075.21
5072+860.00 0.0000 20.8840 0.00 40.50 10.00 0.00 0.00 404.98 1,265,670.23
5072+880.00 0.0000 20.1110 0.00 41.00 10.00 0.00 0.00 409.95 1,265,260.28
5072+900.00 0.2740 14.3450 0.27 34.46 10.00 2.74 3.56 344.56 1,264,919.28
5072+920.00 0.4150 10.7970 0.69 25.14 10.00 6.89 8.96 251.42 1,264,676.82
5072+940.00 0.3110 15.0220 0.73 25.82 10.00 7.26 9.44 258.19 1,264,428.07
5072+960.00 0.3730 9.6320 0.68 24.65 10.00 6.84 8.89 246.54 1,264,190.42
5072+980.00 0.0000 20.4290 0.37 30.06 10.00 3.73 4.85 300.61 1,263,894.66
5073+000.00 0.0000 29.7320 0.00 50.16 10.00 0.00 0.00 501.61 1,263,393.05
246
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5073+020.00 0.0000 19.2120 0.00 48.94 10.00 0.00 0.00 489.44 1,262,903.61
5073+040.00 0.0000 27.9680 0.00 47.18 10.00 0.00 0.00 471.80 1,262,431.81
5073+060.00 0.0000 29.6790 0.00 57.65 10.00 0.00 0.00 576.47 1,261,855.34
5073+080.00 0.0000 24.2560 0.00 53.94 10.00 0.00 0.00 539.35 1,261,315.99
5073+100.00 0.0000 11.2710 0.00 35.53 10.00 0.00 0.00 355.27 1,260,960.72
5073+120.00 0.2490 11.2230 0.25 22.49 10.00 2.49 3.24 224.94 1,260,739.01
5073+140.00 0.0000 18.5420 0.25 29.77 10.00 2.49 3.24 297.65 1,260,444.60
5073+160.00 0.0000 15.0150 0.00 33.56 10.00 0.00 0.00 335.57 1,260,109.03
5073+180.00 0.1960 12.9100 0.20 27.93 10.00 1.96 2.55 279.25 1,259,832.33
5073+200.00 0.0000 16.6990 0.20 29.61 10.00 1.96 2.55 296.09 1,259,538.79
5073+220.00 0.3640 9.4400 0.36 26.14 10.00 3.64 4.73 261.39 1,259,282.13
5073+240.00 0.0000 13.3140 0.36 22.75 10.00 3.64 4.73 227.54 1,259,059.32
5073+260.00 0.0000 25.5920 0.00 38.91 10.00 0.00 0.00 389.06 1,258,670.26
5073+280.00 0.0000 30.1630 0.00 55.76 10.00 0.00 0.00 557.55 1,258,112.71
5073+300.00 0.0000 24.0410 0.00 54.20 10.00 0.00 0.00 542.04 1,257,570.67
5073+320.00 0.0000 22.4530 0.00 46.49 10.00 0.00 0.00 464.94 1,257,105.73
5073+340.00 0.0000 17.4390 0.00 39.89 10.00 0.00 0.00 398.92 1,256,706.81
5073+360.00 0.7870 11.6910 0.79 29.13 10.00 7.87 10.23 291.30 1,256,425.74
5073+380.00 1.1710 8.5120 1.96 20.20 10.00 19.58 25.45 202.03 1,256,249.17
5073+400.00 0.0000 18.1500 1.17 26.66 10.00 11.71 15.22 266.62 1,255,997.77
5073+420.00 0.0000 22.5580 0.00 40.71 10.00 0.00 0.00 407.08 1,255,590.69
5073+440.00 0.0000 18.0990 0.00 40.66 10.00 0.00 0.00 406.57 1,255,184.12
5073+460.00 0.0000 17.3310 0.00 35.43 10.00 0.00 0.00 354.30 1,254,829.82
5073+480.00 0.0000 23.1830 0.00 40.51 10.00 0.00 0.00 405.14 1,254,424.68
5073+500.00 0.0000 18.3820 0.00 41.57 10.00 0.00 0.00 415.65 1,254,009.03
5073+520.00 0.4730 10.7060 0.47 29.09 10.00 4.73 6.15 290.88 1,253,724.30
5073+540.00 0.3650 10.9070 0.84 21.61 10.00 8.38 10.89 216.13 1,253,519.06
5073+560.00 0.6220 8.5260 0.99 19.43 10.00 9.87 12.83 194.33 1,253,337.56
5073+580.00 0.8640 7.6440 1.49 16.17 10.00 14.86 19.32 161.70 1,253,195.18
5073+600.00 0.0000 18.4070 0.86 26.05 10.00 8.64 11.23 260.51 1,252,945.90
5073+620.00 0.0000 22.1600 0.00 40.57 10.00 0.00 0.00 405.67 1,252,540.23
5073+640.00 0.0000 20.7180 0.00 42.88 10.00 0.00 0.00 428.78 1,252,111.45
5073+660.00 0.0000 19.8150 0.00 40.53 10.00 0.00 0.00 405.33 1,251,706.12
5073+680.00 0.0000 16.4330 0.00 36.25 10.00 0.00 0.00 362.48 1,251,343.64
5073+700.00 0.0000 13.7090 0.00 30.14 10.00 0.00 0.00 301.42 1,251,042.22
5073+720.00 0.0000 11.7610 0.00 25.47 10.00 0.00 0.00 254.70 1,250,787.52
5073+740.00 0.1960 9.2280 0.20 20.99 10.00 1.96 2.55 209.89 1,250,580.18
5073+760.00 0.1720 10.6240 0.37 19.85 10.00 3.68 4.78 198.52 1,250,386.44
5073+780.00 0.0000 11.5570 0.17 22.18 10.00 1.72 2.24 221.81 1,250,166.87
5073+800.00 0.0000 16.9110 0.00 28.47 10.00 0.00 0.00 284.68 1,249,882.19
5073+815.00 0.0000 26.5930 0.00 43.50 7.50 0.00 0.00 326.28 1,249,555.91
5073+820.00 0.0000 26.6880 0.00 53.28 2.50 0.00 0.00 133.20 1,249,422.71
5073+825.00 0.0000 27.0020 0.00 53.69 2.50 0.00 0.00 134.23 1,249,288.48
5073+835.00 0.0000 26.2780 0.00 53.28 5.00 0.00 0.00 266.40 1,249,022.08
5073+840.00 0.0000 24.1650 0.00 50.44 2.50 0.00 0.00 126.11 1,248,895.98
247
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
5073+845.00 0.0000 22.0810 0.00 46.25 2.50 0.00 0.00 115.62 1,248,780.36
5073+855.00 0.0000 19.4340 0.00 41.52 5.00 0.00 0.00 207.58 1,248,572.79
5073+860.00 0.0000 19.7510 0.00 39.19 2.50 0.00 0.00 97.96 1,248,474.82
5073+865.00 0.0000 19.9790 0.00 39.73 2.50 0.00 0.00 99.33 1,248,375.50
5073+875.00 0.0000 20.3810 0.00 40.36 5.00 0.00 0.00 201.80 1,248,173.70
5073+880.00 0.0000 20.0290 0.00 40.41 2.50 0.00 0.00 101.03 1,248,072.67
5073+885.00 0.0000 19.3160 0.00 39.35 2.50 0.00 0.00 98.36 1,247,974.31
5073+895.00 0.0000 16.6850 0.00 36.00 5.00 0.00 0.00 180.01 1,247,794.31
5073+900.00 0.0000 16.1640 0.00 32.85 2.50 0.00 0.00 82.12 1,247,712.18
5073+905.00 0.0000 16.1490 0.00 32.31 2.50 0.00 0.00 80.78 1,247,631.40
5073+915.00 0.0000 17.6840 0.00 33.83 5.00 0.00 0.00 169.17 1,247,462.24
5073+920.00 0.0000 19.2100 0.00 36.89 2.50 0.00 0.00 92.24 1,247,370.00
5073+925.00 0.0000 19.1070 0.00 38.32 2.50 0.00 0.00 95.79 1,247,274.21
5073+935.00 0.0000 16.3230 0.00 35.43 5.00 0.00 0.00 177.15 1,247,097.06
5073+940.00 0.0000 13.2060 0.00 29.53 2.50 0.00 0.00 73.82 1,247,023.24
5073+945.00 0.0000 10.2120 0.00 23.42 2.50 0.00 0.00 58.55 1,246,964.69
5073+955.00 0.6400 5.6390 0.64 15.85 5.00 3.20 4.16 79.26 1,246,889.60
5073+960.00 0.7160 3.9090 1.36 9.55 2.50 3.39 4.41 23.87 1,246,870.13
5073+965.00 1.0900 3.2630 1.81 7.17 2.50 4.52 5.87 17.93 1,246,858.07
5073+975.00 1.0250 5.5840 2.12 8.85 5.00 10.58 13.75 44.24 1,246,827.58
5073+980.00 0.3920 8.2750 1.42 13.86 2.50 3.54 4.61 34.65 1,246,797.54
5073+985.32 0.0000 9.9770 0.39 18.25 2.66 1.04 1.35 48.52 1,246,750.37
5074+000.00 0.0000 12.8910 0.00 22.87 7.34 0.00 0.00 167.89 1,246,582.49
5074+005.32 0.0000 14.5190 0.00 27.41 2.66 0.00 0.00 72.87 1,246,509.62
5074+020.00 0.0000 15.3010 0.00 29.82 7.34 0.00 0.00 218.92 1,246,290.70
5074+040.00 0.0000 13.5330 0.00 28.83 10.00 0.00 0.00 288.34 1,246,002.36
5074+060.00 0.0000 17.0100 0.00 30.54 10.00 0.00 0.00 305.43 1,245,696.93
5074+080.00 0.0000 17.5490 0.00 34.56 10.00 0.00 0.00 345.59 1,245,351.34
5074+100.00 0.0000 17.9990 0.00 35.55 10.00 0.00 0.00 355.48 1,244,995.86
5074+120.00 0.0000 18.1240 0.00 36.12 10.00 0.00 0.00 361.23 1,244,634.63
5074+140.00 0.0000 23.0000 0.00 41.12 10.00 0.00 0.00 411.24 1,244,223.39
5074+160.00 0.0000 19.3160 0.00 42.32 10.00 0.00 0.00 423.16 1,243,800.23
5074+180.00 0.0000 15.9120 0.00 35.23 10.00 0.00 0.00 352.28 1,243,447.95
5074+200.00 0.0000 23.2960 0.00 39.21 10.00 0.00 0.00 392.08 1,243,055.87
5074+220.00 0.0000 17.1230 0.00 40.42 10.00 0.00 0.00 404.19 1,242,651.68
5074+240.00 0.0000 16.6740 0.00 33.80 10.00 0.00 0.00 337.97 1,242,313.71
5074+260.00 0.0000 13.9730 0.00 30.65 10.00 0.00 0.00 306.47 1,242,007.24
5074+280.00 0.0000 19.8230 0.00 33.80 10.00 0.00 0.00 337.96 1,241,669.28
5074+300.00 0.0000 18.4520 0.00 38.28 10.00 0.00 0.00 382.75 1,241,286.53
5074+320.00 0.0000 13.6210 0.00 32.07 10.00 0.00 0.00 320.73 1,240,965.80
5074+340.00 0.0000 6.7360 0.00 20.36 10.00 0.00 0.00 203.57 1,240,762.23
5074+360.00 0.9530 2.2510 0.95 8.99 10.00 9.53 12.39 89.87 1,240,684.74
5074+380.00 0.8130 3.6390 1.77 5.89 10.00 17.66 22.96 58.90 1,240,648.80
5074+400.00 1.2050 2.9880 2.02 6.63 10.00 20.18 26.23 66.27 1,240,608.77
5074+400.19 1.2200 2.9490 2.43 5.94 0.09 0.23 0.30 0.56 1,240,608.50
248
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
249
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6001+440.00 0.0000 10.2170 2.63 11.39 10.00 26.33 34.23 113.89 1,292,805.73
6001+460.00 0.0000 15.5560 0.00 25.77 10.00 0.00 0.00 257.73 1,292,548.00
6001+480.00 0.0000 10.8370 0.00 26.39 10.00 0.00 0.00 263.93 1,292,284.07
6001+500.00 0.0000 9.1560 0.00 19.99 10.00 0.00 0.00 199.93 1,292,084.14
6001+520.00 0.0000 8.2600 0.00 17.42 10.00 0.00 0.00 174.16 1,291,909.98
6001+540.00 0.7150 8.3710 0.72 16.63 10.00 7.15 9.30 166.31 1,291,752.97
6001+560.00 0.0000 19.4540 0.72 27.83 10.00 7.15 9.30 278.25 1,291,484.01
6001+580.00 0.0000 25.2910 0.00 44.75 10.00 0.00 0.00 447.45 1,291,036.56
6001+600.00 0.0000 28.2400 0.00 53.53 10.00 0.00 0.00 535.31 1,290,501.25
6001+620.00 0.0000 27.4410 0.00 55.68 10.00 0.00 0.00 556.81 1,289,944.44
6001+640.00 0.0000 24.4600 0.00 51.90 10.00 0.00 0.00 519.01 1,289,425.43
6001+660.00 0.0000 23.7520 0.00 48.21 10.00 0.00 0.00 482.12 1,288,943.31
6001+680.00 0.0000 25.1930 0.00 48.95 10.00 0.00 0.00 489.45 1,288,453.86
6001+700.00 0.0000 29.1740 0.00 54.37 10.00 0.00 0.00 543.67 1,287,910.19
6001+720.00 0.0000 29.2910 0.00 58.47 10.00 0.00 0.00 584.65 1,287,325.54
6001+740.00 0.0000 27.0410 0.00 56.33 10.00 0.00 0.00 563.32 1,286,762.22
6001+760.00 0.0000 18.2280 0.00 45.27 10.00 0.00 0.00 452.69 1,286,309.53
6001+780.00 0.0000 25.7460 0.00 43.97 10.00 0.00 0.00 439.74 1,285,869.79
6001+800.00 0.0000 32.8130 0.00 58.56 10.00 0.00 0.00 585.59 1,285,284.20
6001+820.00 0.0000 36.3050 0.00 69.12 10.00 0.00 0.00 691.18 1,284,593.02
6001+840.00 0.0000 30.0000 0.00 66.31 10.00 0.00 0.00 663.05 1,283,929.97
6001+860.00 0.0000 19.0330 0.00 49.03 10.00 0.00 0.00 490.33 1,283,439.64
6001+880.00 0.0000 28.4490 0.00 47.48 10.00 0.00 0.00 474.82 1,282,964.82
6001+900.00 0.0000 31.3930 0.00 59.84 10.00 0.00 0.00 598.42 1,282,366.40
6001+920.00 0.0000 31.6980 0.00 63.09 10.00 0.00 0.00 630.91 1,281,735.49
6001+940.00 0.0000 23.6070 0.00 55.31 10.00 0.00 0.00 553.05 1,281,182.44
6001+960.00 0.0000 24.3180 0.00 47.93 10.00 0.00 0.00 479.25 1,280,703.19
6001+980.00 0.0000 19.8550 0.00 44.17 10.00 0.00 0.00 441.73 1,280,261.46
6002+000.00 0.0000 20.6620 0.00 40.52 10.00 0.00 0.00 405.17 1,279,856.29
6002+020.00 0.0000 13.1740 0.00 33.84 10.00 0.00 0.00 338.36 1,279,517.93
6002+040.00 0.0000 12.0400 0.00 25.21 10.00 0.00 0.00 252.14 1,279,265.79
6002+060.00 0.0000 16.5490 0.00 28.59 10.00 0.00 0.00 285.89 1,278,979.90
6002+080.00 0.0000 12.8850 0.00 29.43 10.00 0.00 0.00 294.34 1,278,685.56
6002+100.00 0.0000 14.0820 0.00 26.97 10.00 0.00 0.00 269.67 1,278,415.89
6002+120.00 0.0000 9.2760 0.00 23.36 10.00 0.00 0.00 233.58 1,278,182.31
6002+140.00 0.9960 2.9540 1.00 12.23 10.00 9.96 12.95 122.30 1,278,072.96
6002+160.00 0.0000 13.2930 1.00 16.25 10.00 9.96 12.95 162.47 1,277,923.44
6002+180.00 0.0000 12.8760 0.00 26.17 10.00 0.00 0.00 261.69 1,277,661.75
6002+200.00 0.0000 11.2500 0.00 24.13 10.00 0.00 0.00 241.26 1,277,420.49
6002+220.00 8.8940 0.1300 8.89 11.38 10.00 88.94 115.62 113.80 1,277,422.31
6002+240.00 8.1100 0.1160 17.00 0.25 10.00 170.04 221.05 2.46 1,277,640.90
6002+260.00 0.0000 8.5860 8.11 8.70 10.00 81.10 105.43 87.02 1,277,659.31
6002+280.00 0.0000 9.9600 0.00 18.55 10.00 0.00 0.00 185.46 1,277,473.85
6002+300.00 0.9450 3.8100 0.95 13.77 10.00 9.45 12.29 137.70 1,277,348.44
6002+320.00 0.6980 4.7840 1.64 8.59 10.00 16.43 21.36 85.94 1,277,283.86
250
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6002+340.00 0.0000 4.2190 0.70 9.00 10.00 6.98 9.07 90.03 1,277,202.90
6002+360.00 0.0000 4.6260 0.00 8.85 10.00 0.00 0.00 88.45 1,277,114.45
6002+380.00 2.0680 3.5870 2.07 8.21 10.00 20.68 26.88 82.13 1,277,059.21
6002+400.00 0.0000 7.8230 2.07 11.41 10.00 20.68 26.88 114.10 1,276,971.99
6002+420.00 0.0000 14.2050 0.00 22.03 10.00 0.00 0.00 220.28 1,276,751.71
6002+440.00 0.0000 8.1460 0.00 22.35 10.00 0.00 0.00 223.51 1,276,528.20
6002+460.00 0.0000 11.8800 0.00 20.03 10.00 0.00 0.00 200.26 1,276,327.94
6002+480.00 0.0000 17.0720 0.00 28.95 10.00 0.00 0.00 289.52 1,276,038.42
6002+500.00 0.0000 20.9680 0.00 38.04 10.00 0.00 0.00 380.40 1,275,658.02
6002+520.00 0.0000 22.6020 0.00 43.57 10.00 0.00 0.00 435.70 1,275,222.32
6002+540.00 0.0000 19.7760 0.00 42.38 10.00 0.00 0.00 423.78 1,274,798.54
6002+560.00 0.0000 16.7460 0.00 36.52 10.00 0.00 0.00 365.22 1,274,433.32
6002+580.00 0.0000 2.7130 0.00 19.46 10.00 0.00 0.00 194.59 1,274,238.73
6002+600.00 4.3490 0.1190 4.35 2.83 10.00 43.49 56.54 28.32 1,274,266.95
6002+620.00 0.0000 3.6400 4.35 3.76 10.00 43.49 56.54 37.59 1,274,285.89
6002+640.00 0.0000 7.5510 0.00 11.19 10.00 0.00 0.00 111.91 1,274,173.98
6002+660.00 0.0000 15.6170 0.00 23.17 10.00 0.00 0.00 231.68 1,273,942.30
6002+680.00 0.0000 19.2510 0.00 34.87 10.00 0.00 0.00 348.68 1,273,593.62
6002+700.00 0.0000 15.1840 0.00 34.44 10.00 0.00 0.00 344.35 1,273,249.27
6002+720.00 0.0000 13.2570 0.00 28.44 10.00 0.00 0.00 284.41 1,272,964.86
6002+740.00 0.0000 14.5540 0.00 27.81 10.00 0.00 0.00 278.11 1,272,686.75
6002+760.00 0.0000 29.6150 0.00 44.17 10.00 0.00 0.00 441.69 1,272,245.06
6002+780.00 0.0000 39.6190 0.00 69.23 10.00 0.00 0.00 692.34 1,271,552.72
6002+800.00 0.0000 36.0680 0.00 75.69 10.00 0.00 0.00 756.87 1,270,795.85
6002+820.00 0.0000 30.0730 0.00 66.14 10.00 0.00 0.00 661.41 1,270,134.44
6002+830.00 0.0000 26.5680 0.00 56.64 5.00 0.00 0.00 283.21 1,269,851.24
6002+830.00 0.0000 26.2380 0.00 52.81 0.00 0.00 0.00 0.00 1,269,851.24
6002+840.00 0.0000 25.1160 0.00 51.35 5.00 0.00 0.00 256.77 1,269,594.47
6002+860.00 0.0000 30.7800 0.00 55.90 10.00 0.00 0.00 558.96 1,269,035.51
6002+880.00 0.0000 46.9540 0.00 77.73 10.00 0.00 0.00 777.34 1,268,258.17
6002+900.00 0.0000 52.4360 0.00 99.39 10.00 0.00 0.00 993.90 1,267,264.27
6002+920.00 0.0000 46.1800 0.00 98.62 10.00 0.00 0.00 986.16 1,266,278.11
6002+940.00 0.0000 53.4870 0.00 99.67 10.00 0.00 0.00 996.67 1,265,281.44
6002+960.00 0.0000 56.8810 0.00 110.37 10.00 0.00 0.00 1,103.68 1,264,177.76
6002+980.00 0.0000 66.9380 0.00 123.82 10.00 0.00 0.00 1,238.19 1,262,939.57
6002+980.00 0.0000 65.5870 0.00 132.53 0.00 0.00 0.00 0.00 1,262,939.57
6003+000.00 0.0000 82.4310 0.00 148.02 10.00 0.00 0.00 1,480.18 1,261,459.39
6003+020.00 0.0000 85.6110 0.00 168.04 10.00 0.00 0.00 1,680.42 1,259,778.97
6003+040.00 0.0000 83.3580 0.00 168.97 10.00 0.00 0.00 1,689.69 1,258,089.28
6003+060.00 0.0000 85.9220 0.00 169.28 10.00 0.00 0.00 1,692.80 1,256,396.48
6003+080.00 0.0000 92.3740 0.00 178.30 10.00 0.00 0.00 1,782.96 1,254,613.52
6003+100.00 0.0000 88.0510 0.00 180.43 10.00 0.00 0.00 1,804.25 1,252,809.27
6003+120.00 0.0000 93.3160 0.00 181.37 10.00 0.00 0.00 1,813.67 1,250,995.60
6003+140.00 0.0000 118.7060 0.00 212.02 10.00 0.00 0.00 2,120.22 1,248,875.38
6003+160.00 0.0000 131.7280 0.00 250.43 10.00 0.00 0.00 2,504.34 1,246,371.04
251
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6003+180.00 0.0000 138.5300 0.00 270.26 10.00 0.00 0.00 2,702.58 1,243,668.46
6003+200.00 0.0000 147.9830 0.00 286.51 10.00 0.00 0.00 2,865.13 1,240,803.33
6003+220.00 0.0000 162.6560 0.00 310.64 10.00 0.00 0.00 3,106.39 1,237,696.94
6003+240.00 0.0000 172.5680 0.00 335.22 10.00 0.00 0.00 3,352.24 1,234,344.70
6003+260.00 0.0000 175.8010 0.00 348.37 10.00 0.00 0.00 3,483.69 1,230,861.01
6003+280.00 0.0000 169.8310 0.00 345.63 10.00 0.00 0.00 3,456.32 1,227,404.69
6003+300.00 0.0000 172.2230 0.00 342.05 10.00 0.00 0.00 3,420.54 1,223,984.15
6003+320.00 0.0000 186.8240 0.00 359.05 10.00 0.00 0.00 3,590.47 1,220,393.68
6003+340.00 0.0000 204.1510 0.00 390.98 10.00 0.00 0.00 3,909.75 1,216,483.93
6003+360.00 0.0000 205.6240 0.00 409.78 10.00 0.00 0.00 4,097.75 1,212,386.18
6003+380.00 0.0000 202.4300 0.00 408.05 10.00 0.00 0.00 4,080.54 1,208,305.64
6003+400.00 0.0000 214.8940 0.00 417.32 10.00 0.00 0.00 4,173.24 1,204,132.40
6003+420.00 0.0000 213.6920 0.00 428.59 10.00 0.00 0.00 4,285.86 1,199,846.54
6003+440.00 0.0000 217.4200 0.00 431.11 10.00 0.00 0.00 4,311.12 1,195,535.42
6003+460.00 0.0000 196.0490 0.00 413.47 10.00 0.00 0.00 4,134.69 1,191,400.73
6003+480.00 0.0000 199.8150 0.00 395.86 10.00 0.00 0.00 3,958.64 1,187,442.09
6003+500.00 0.0000 203.5800 0.00 403.40 10.00 0.00 0.00 4,033.95 1,183,408.14
6003+520.00 0.0000 216.3160 0.00 419.90 10.00 0.00 0.00 4,198.96 1,179,209.18
6003+536.24 0.0000 215.9320 0.00 432.25 8.12 0.00 0.00 3,509.85 1,175,699.32
6003+536.24 0.0000 0.0000 0.00 215.93 0.00 0.00 0.00 0.00 1,175,699.32
6003+536.24 0.0000 0.0000 0.00 0.00 0.00 0.00 0.00 0.00 1,175,699.32
6003+540.00 0.0000 0.0000 0.00 0.00 1.88 0.00 0.00 0.00 1,175,699.32
6003+560.00 0.0000 0.0000 0.00 0.00 10.00 0.00 0.00 0.00 1,175,699.32
6003+568.24 0.0000 0.0000 0.00 0.00 4.12 0.00 0.00 0.00 1,175,699.32
6003+568.24 0.0000 0.0000 0.00 0.00 0.00 0.00 0.00 0.00 1,175,699.32
6003+568.24 0.0000 199.9440 0.00 199.94 0.00 0.00 0.00 0.00 1,175,699.32
6003+580.00 0.0000 204.8750 0.00 404.82 5.88 0.00 0.00 2,380.34 1,173,318.99
6003+600.00 0.0000 207.1120 0.00 411.99 10.00 0.00 0.00 4,119.87 1,169,199.12
6003+620.00 0.0000 229.2610 0.00 436.37 10.00 0.00 0.00 4,363.73 1,164,835.39
6003+640.00 0.0000 223.1120 0.00 452.37 10.00 0.00 0.00 4,523.73 1,160,311.66
6003+660.00 0.0000 207.7280 0.00 430.84 10.00 0.00 0.00 4,308.40 1,156,003.26
6003+680.00 0.0000 210.5410 0.00 418.27 10.00 0.00 0.00 4,182.69 1,151,820.57
6003+700.00 0.0000 202.6030 0.00 413.14 10.00 0.00 0.00 4,131.44 1,147,689.13
6003+720.00 0.0000 199.9320 0.00 402.54 10.00 0.00 0.00 4,025.35 1,143,663.78
6003+740.00 0.0000 198.3050 0.00 398.24 10.00 0.00 0.00 3,982.37 1,139,681.41
6003+760.00 0.0000 186.3820 0.00 384.69 10.00 0.00 0.00 3,846.87 1,135,834.54
6003+780.00 0.0000 176.0450 0.00 362.43 10.00 0.00 0.00 3,624.27 1,132,210.27
6003+800.00 0.0000 173.2440 0.00 349.29 10.00 0.00 0.00 3,492.89 1,128,717.38
6003+820.00 0.0000 188.6680 0.00 361.91 10.00 0.00 0.00 3,619.12 1,125,098.26
6003+840.00 0.0000 191.7460 0.00 380.41 10.00 0.00 0.00 3,804.14 1,121,294.12
6003+860.00 0.0000 177.0530 0.00 368.80 10.00 0.00 0.00 3,687.99 1,117,606.13
6003+880.00 0.0000 170.0200 0.00 347.07 10.00 0.00 0.00 3,470.73 1,114,135.40
6003+900.00 0.0000 148.3460 0.00 318.37 10.00 0.00 0.00 3,183.66 1,110,951.74
6003+900.00 0.0000 153.6650 0.00 302.01 0.00 0.00 0.00 0.00 1,110,951.74
6003+920.00 0.0000 141.7640 0.00 295.43 10.00 0.00 0.00 2,954.29 1,107,997.45
252
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6003+940.00 0.0000 134.9770 0.00 276.74 10.00 0.00 0.00 2,767.41 1,105,230.04
6003+960.00 0.0000 122.8850 0.00 257.86 10.00 0.00 0.00 2,578.62 1,102,651.42
6003+974.92 0.0000 117.4730 0.00 240.36 7.46 0.00 0.00 1,793.31 1,100,858.11
6003+980.00 0.0000 113.3200 0.00 230.79 2.54 0.00 0.00 585.98 1,100,272.12
6004+000.00 0.0000 103.4850 0.00 216.81 10.00 0.00 0.00 2,168.05 1,098,104.07
6004+020.00 0.0000 97.1750 0.00 200.66 10.00 0.00 0.00 2,006.60 1,096,097.47
6004+040.00 0.0000 91.5790 0.00 188.75 10.00 0.00 0.00 1,887.54 1,094,209.93
6004+060.00 0.0000 95.1670 0.00 186.75 10.00 0.00 0.00 1,867.46 1,092,342.47
6004+080.00 0.0000 91.4110 0.00 186.58 10.00 0.00 0.00 1,865.78 1,090,476.69
6004+100.00 0.0000 84.0630 0.00 175.47 10.00 0.00 0.00 1,754.74 1,088,721.95
6004+120.00 0.0000 75.4990 0.00 159.56 10.00 0.00 0.00 1,595.62 1,087,126.33
6004+124.92 0.0000 74.3290 0.00 149.83 2.46 0.00 0.00 368.73 1,086,757.61
6004+140.00 0.0000 61.6460 0.00 135.98 7.54 0.00 0.00 1,025.12 1,085,732.49
6004+160.00 0.0000 56.1070 0.00 117.75 10.00 0.00 0.00 1,177.53 1,084,554.96
6004+180.00 0.0000 64.2690 0.00 120.38 10.00 0.00 0.00 1,203.76 1,083,351.20
6004+200.00 0.0000 65.9000 0.00 130.17 10.00 0.00 0.00 1,301.69 1,082,049.51
6004+220.00 0.0000 51.9120 0.00 117.81 10.00 0.00 0.00 1,178.12 1,080,871.39
6004+240.00 0.0000 33.2440 0.00 85.16 10.00 0.00 0.00 851.56 1,080,019.83
6004+260.00 0.0000 14.8090 0.00 48.05 10.00 0.00 0.00 480.53 1,079,539.30
6004+280.00 0.0000 13.9780 0.00 28.79 10.00 0.00 0.00 287.87 1,079,251.43
6004+300.00 0.0000 27.1190 0.00 41.10 10.00 0.00 0.00 410.97 1,078,840.46
6004+320.00 0.0000 14.3400 0.00 41.46 10.00 0.00 0.00 414.59 1,078,425.87
6004+340.00 0.0000 23.1300 0.00 37.47 10.00 0.00 0.00 374.70 1,078,051.17
6004+355.41 0.0000 25.3080 0.00 48.44 7.71 0.00 0.00 373.31 1,077,677.86
6004+360.00 0.0000 24.2370 0.00 49.55 2.29 0.00 0.00 113.61 1,077,564.25
6004+380.00 0.0000 10.4830 0.00 34.72 10.00 0.00 0.00 347.20 1,077,217.05
6004+400.00 0.5980 3.8590 0.60 14.34 10.00 5.98 7.77 143.42 1,077,081.41
6004+420.00 0.0000 10.7040 0.60 14.56 10.00 5.98 7.77 145.63 1,076,943.55
6004+440.00 0.0000 10.1480 0.00 20.85 10.00 0.00 0.00 208.52 1,076,735.03
6004+460.00 0.0000 13.6870 0.00 23.84 10.00 0.00 0.00 238.35 1,076,496.68
6004+480.00 0.0000 12.6200 0.00 26.31 10.00 0.00 0.00 263.07 1,076,233.61
6004+500.00 0.0000 9.1600 0.00 21.78 10.00 0.00 0.00 217.80 1,076,015.81
6004+505.41 0.0000 10.1680 0.00 19.33 2.71 0.00 0.00 52.32 1,075,963.49
6004+520.00 0.0000 10.3270 0.00 20.50 7.29 0.00 0.00 149.47 1,075,814.02
6004+540.00 1.3320 0.6510 1.33 10.98 10.00 13.32 17.32 109.78 1,075,721.56
6004+560.00 0.0000 10.2310 1.33 10.88 10.00 13.32 17.32 108.82 1,075,630.05
6004+580.00 0.0000 14.1590 0.00 24.39 10.00 0.00 0.00 243.90 1,075,386.15
6004+600.00 0.0000 8.3740 0.00 22.53 10.00 0.00 0.00 225.33 1,075,160.82
6004+615.00 0.4110 3.6290 0.41 12.00 7.50 3.08 4.01 90.02 1,075,074.81
6004+615.00 0.4690 3.1640 0.88 6.79 0.00 0.00 0.00 0.00 1,075,074.81
6004+620.00 0.7050 2.7060 1.17 5.87 2.50 2.94 3.82 14.68 1,075,063.95
6004+640.00 0.7740 4.4170 1.48 7.12 10.00 14.79 19.23 71.23 1,075,011.95
6004+660.00 0.0000 7.6750 0.77 12.09 10.00 7.74 10.06 120.92 1,074,901.09
6004+680.00 0.7740 4.6600 0.77 12.34 10.00 7.74 10.06 123.35 1,074,787.80
6004+700.00 0.5880 4.4910 1.36 9.15 10.00 13.62 17.71 91.51 1,074,714.00
253
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6004+720.00 0.0000 9.4290 0.59 13.92 10.00 5.88 7.64 139.20 1,074,582.44
6004+740.00 0.0000 8.5610 0.00 17.99 10.00 0.00 0.00 179.90 1,074,402.54
6004+760.00 0.0000 10.8870 0.00 19.45 10.00 0.00 0.00 194.48 1,074,208.06
6004+780.00 0.0000 8.4720 0.00 19.36 10.00 0.00 0.00 193.59 1,074,014.47
6004+800.00 0.0000 8.4020 0.00 16.87 10.00 0.00 0.00 168.74 1,073,845.73
6004+820.00 0.0000 10.3730 0.00 18.78 10.00 0.00 0.00 187.75 1,073,657.98
6004+840.00 0.0000 12.3060 0.00 22.68 10.00 0.00 0.00 226.79 1,073,431.19
6004+860.00 0.0000 12.1570 0.00 24.46 10.00 0.00 0.00 244.63 1,073,186.56
6004+880.00 0.0000 8.5960 0.00 20.75 10.00 0.00 0.00 207.53 1,072,979.03
6004+900.00 0.0000 7.9110 0.00 16.51 10.00 0.00 0.00 165.07 1,072,813.96
6004+920.00 0.0000 10.2320 0.00 18.14 10.00 0.00 0.00 181.43 1,072,632.53
6004+940.00 0.0000 9.7890 0.00 20.02 10.00 0.00 0.00 200.21 1,072,432.32
6004+960.00 0.0000 10.8960 0.00 20.69 10.00 0.00 0.00 206.85 1,072,225.47
6004+980.00 0.0000 10.3070 0.00 21.20 10.00 0.00 0.00 212.03 1,072,013.44
6005+000.00 0.4450 4.8220 0.45 15.13 10.00 4.45 5.79 151.29 1,071,867.93
6005+020.00 0.5170 3.9270 0.96 8.75 10.00 9.62 12.51 87.49 1,071,792.95
6005+040.00 0.0000 4.1370 0.52 8.06 10.00 5.17 6.72 80.64 1,071,719.03
6005+060.00 0.3830 6.3670 0.38 10.50 10.00 3.83 4.98 105.04 1,071,618.97
6005+080.00 0.0000 9.5310 0.38 15.90 10.00 3.83 4.98 158.98 1,071,464.97
6005+100.00 0.0000 6.7230 0.00 16.25 10.00 0.00 0.00 162.54 1,071,302.43
6005+104.49 0.0000 5.8840 0.00 12.61 2.24 0.00 0.00 28.30 1,071,274.13
6005+120.00 0.0000 7.9010 0.00 13.79 7.76 0.00 0.00 106.91 1,071,167.22
6005+140.00 0.0000 9.4310 0.00 17.33 10.00 0.00 0.00 173.32 1,070,993.90
6005+160.00 0.4320 5.6460 0.43 15.08 10.00 4.32 5.62 150.77 1,070,848.75
6005+180.00 0.4880 4.0140 0.92 9.66 10.00 9.20 11.96 96.60 1,070,764.11
6005+200.00 0.0000 7.0890 0.49 11.10 10.00 4.88 6.34 111.03 1,070,659.42
6005+220.00 0.0000 9.5550 0.00 16.64 10.00 0.00 0.00 166.44 1,070,492.98
6005+240.00 0.0000 12.8180 0.00 22.37 10.00 0.00 0.00 223.73 1,070,269.25
6005+254.49 0.0000 14.6630 0.00 27.48 7.24 0.00 0.00 199.09 1,070,070.17
6005+260.00 0.0000 13.2110 0.00 27.87 2.76 0.00 0.00 76.81 1,069,993.36
6005+280.00 0.0000 11.4600 0.00 24.67 10.00 0.00 0.00 246.71 1,069,746.65
6005+300.00 0.0000 15.7580 0.00 27.22 10.00 0.00 0.00 272.18 1,069,474.47
6005+320.00 0.0000 14.9070 0.00 30.67 10.00 0.00 0.00 306.65 1,069,167.82
6005+340.00 0.3990 5.8220 0.40 20.73 10.00 3.99 5.19 207.29 1,068,965.72
6005+360.00 0.4990 5.1540 0.90 10.98 10.00 8.98 11.67 109.76 1,068,867.63
6005+361.69 0.0000 6.1460 0.50 11.30 0.85 0.42 0.55 9.57 1,068,858.62
6005+380.00 0.0000 12.8880 0.00 19.03 9.15 0.00 0.00 174.23 1,068,684.39
6005+400.00 0.0000 13.2810 0.00 26.17 10.00 0.00 0.00 261.69 1,068,422.70
6005+420.00 0.0000 11.1480 0.00 24.43 10.00 0.00 0.00 244.29 1,068,178.41
6005+440.00 0.0000 9.2450 0.00 20.39 10.00 0.00 0.00 203.93 1,067,974.48
6005+460.00 0.0000 8.2950 0.00 17.54 10.00 0.00 0.00 175.40 1,067,799.08
6005+480.00 0.0000 9.7440 0.00 18.04 10.00 0.00 0.00 180.39 1,067,618.69
6005+500.00 0.0000 13.2070 0.00 22.95 10.00 0.00 0.00 229.51 1,067,389.18
6005+511.69 0.0000 13.7900 0.00 27.00 5.85 0.00 0.00 157.84 1,067,231.34
6005+520.00 0.0000 13.8830 0.00 27.67 4.15 0.00 0.00 114.94 1,067,116.40
254
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6005+540.00 0.0000 11.3010 0.00 25.18 10.00 0.00 0.00 251.84 1,066,864.56
6005+560.00 0.0000 9.6930 0.00 20.99 10.00 0.00 0.00 209.94 1,066,654.62
6005+580.00 0.0000 11.7830 0.00 21.48 10.00 0.00 0.00 214.76 1,066,439.86
6005+600.00 0.0000 15.8820 0.00 27.67 10.00 0.00 0.00 276.65 1,066,163.21
6005+620.00 0.0000 13.6720 0.00 29.55 10.00 0.00 0.00 295.54 1,065,867.67
6005+640.00 0.0000 8.2980 0.00 21.97 10.00 0.00 0.00 219.70 1,065,647.97
6005+660.00 0.0000 15.2750 0.00 23.57 10.00 0.00 0.00 235.73 1,065,412.24
6005+680.00 0.0000 15.1280 0.00 30.40 10.00 0.00 0.00 304.03 1,065,108.21
6005+700.00 0.0000 13.6740 0.00 28.80 10.00 0.00 0.00 288.02 1,064,820.19
6005+720.00 0.0000 9.9690 0.00 23.64 10.00 0.00 0.00 236.43 1,064,583.76
6005+740.00 0.9650 2.8270 0.97 12.80 10.00 9.65 12.55 127.96 1,064,468.34
6005+760.00 0.8960 2.4690 1.86 5.30 10.00 18.61 24.19 52.96 1,064,439.58
6005+780.00 0.5910 5.4010 1.49 7.87 10.00 14.87 19.33 78.70 1,064,380.21
6005+800.00 0.5190 8.7070 1.11 14.11 10.00 11.10 14.43 141.08 1,064,253.56
6005+820.00 0.7460 7.1830 1.27 15.89 10.00 12.65 16.45 158.90 1,064,111.10
6005+840.00 1.2150 3.4310 1.96 10.61 10.00 19.61 25.49 106.14 1,064,030.46
6005+860.00 0.0000 6.6390 1.22 10.07 10.00 12.15 15.80 100.70 1,063,945.55
6005+880.00 0.0000 15.5980 0.00 22.24 10.00 0.00 0.00 222.37 1,063,723.18
6005+900.00 0.0000 15.9290 0.00 31.53 10.00 0.00 0.00 315.27 1,063,407.91
6005+920.00 0.0000 13.9650 0.00 29.89 10.00 0.00 0.00 298.94 1,063,108.97
6005+940.00 0.8690 2.8010 0.87 16.77 10.00 8.69 11.30 167.66 1,062,952.61
6005+960.00 7.2690 0.5790 8.14 3.38 10.00 81.38 105.79 33.80 1,063,024.60
6005+980.00 0.3430 10.3890 7.61 10.97 10.00 76.12 98.96 109.68 1,063,013.88
6006+000.00 0.0000 11.0360 0.34 21.43 10.00 3.43 4.46 214.25 1,062,804.09
TABLA 27 CÁLCULO DE CURVA MASA DEL TRAMO DEL 6017+000 AL 6030+000
255
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6017+220.00 0.0000 103.9260 0.00 197.70 10.00 0.00 0.00 1,976.97 1,276,529.73
6017+240.00 0.0000 126.9090 0.00 230.84 10.00 0.00 0.00 2,308.35 1,274,221.38
6017+260.00 0.0000 136.2950 0.00 263.20 10.00 0.00 0.00 2,632.04 1,271,589.34
6017+280.00 0.0000 135.5900 0.00 271.89 10.00 0.00 0.00 2,718.85 1,268,870.49
6017+300.00 0.0000 167.7680 0.00 303.36 10.00 0.00 0.00 3,033.58 1,265,836.91
6017+320.00 0.0000 192.1060 0.00 359.87 10.00 0.00 0.00 3,598.74 1,262,238.17
6017+340.00 0.0000 203.7660 0.00 395.87 10.00 0.00 0.00 3,958.72 1,258,279.45
6017+360.00 0.0000 216.1980 0.00 419.96 10.00 0.00 0.00 4,199.64 1,254,079.81
6017+380.00 0.0000 207.2560 0.00 423.45 10.00 0.00 0.00 4,234.54 1,249,845.27
6017+400.00 0.0000 182.4970 0.00 389.75 10.00 0.00 0.00 3,897.53 1,245,947.74
6017+420.00 0.0000 220.1490 0.00 402.65 10.00 0.00 0.00 4,026.46 1,241,921.28
6017+440.00 0.0000 237.6310 0.00 457.78 10.00 0.00 0.00 4,577.80 1,237,343.48
6017+460.00 0.0000 212.7670 0.00 450.40 10.00 0.00 0.00 4,503.98 1,232,839.50
6017+480.00 0.0000 201.9600 0.00 414.73 10.00 0.00 0.00 4,147.27 1,228,692.23
6017+500.00 0.0000 244.4530 0.00 446.41 10.00 0.00 0.00 4,464.13 1,224,228.10
6017+520.00 0.0000 245.4420 0.00 489.90 10.00 0.00 0.00 4,898.95 1,219,329.15
6017+540.00 0.0000 262.5590 0.00 508.00 10.00 0.00 0.00 5,080.01 1,214,249.14
6017+560.00 0.0000 264.3190 0.00 526.88 10.00 0.00 0.00 5,268.78 1,208,980.36
6017+579.55 0.0000 270.9720 0.00 535.29 9.78 0.00 0.00 5,233.27 1,203,747.09
6017+580.00 0.0000 270.9140 0.00 541.89 0.22 0.00 0.00 121.11 1,203,625.98
6017+600.00 0.0000 264.4060 0.00 535.32 10.00 0.00 0.00 5,353.20 1,198,272.78
6017+606.68 0.0000 249.6630 0.00 514.07 3.34 0.00 0.00 1,717.50 1,196,555.27
6017+606.68 0.0000 0.0000 0.00 249.66 0.00 0.00 0.00 0.00 1,196,555.27
6017+606.68 0.0000 0.0000 0.00 0.00 0.00 0.00 0.00 0.00 1,196,555.27
6017+620.00 0.0000 0.0000 0.00 0.00 6.66 0.00 0.00 0.00 1,196,555.27
6017+640.00 0.0000 0.0000 0.00 0.00 10.00 0.00 0.00 0.00 1,196,555.27
6017+660.00 0.0000 0.0000 0.00 0.00 10.00 0.00 0.00 0.00 1,196,555.27
6017+670.68 0.0000 0.0000 0.00 0.00 5.34 0.00 0.00 0.00 1,196,555.27
6017+670.68 0.0000 0.0000 0.00 0.00 0.00 0.00 0.00 0.00 1,196,555.27
6017+670.68 0.0000 245.8970 0.00 245.90 0.00 0.00 0.00 0.00 1,196,555.27
6017+680.00 0.0000 249.8420 0.00 495.74 4.66 0.00 0.00 2,309.65 1,194,245.63
6017+700.00 0.0000 239.9860 0.00 489.83 10.00 0.00 0.00 4,898.28 1,189,347.35
6017+720.00 0.0000 239.6410 0.00 479.63 10.00 0.00 0.00 4,796.27 1,184,551.08
6017+729.55 0.0000 249.6130 0.00 489.25 4.78 0.00 0.00 2,336.92 1,182,214.15
6017+740.00 0.0000 256.7890 0.00 506.40 5.22 0.00 0.00 2,645.19 1,179,568.96
6017+760.00 0.0000 255.1160 0.00 511.91 10.00 0.00 0.00 5,119.05 1,174,449.91
6017+780.00 0.0000 249.1410 0.00 504.26 10.00 0.00 0.00 5,042.57 1,169,407.34
6017+800.00 0.0000 241.4590 0.00 490.60 10.00 0.00 0.00 4,906.00 1,164,501.34
6017+820.00 0.0000 230.2960 0.00 471.76 10.00 0.00 0.00 4,717.55 1,159,783.79
6017+840.00 0.0000 215.7380 0.00 446.03 10.00 0.00 0.00 4,460.34 1,155,323.45
6017+860.00 0.0000 223.0310 0.00 438.77 10.00 0.00 0.00 4,387.69 1,150,935.76
6017+880.00 0.0000 229.4310 0.00 452.46 10.00 0.00 0.00 4,524.62 1,146,411.14
6017+900.00 0.0000 224.8500 0.00 454.28 10.00 0.00 0.00 4,542.81 1,141,868.33
6017+902.74 0.0000 224.2190 0.00 449.07 1.37 0.00 0.00 615.67 1,141,252.66
6017+920.00 0.0000 217.5840 0.00 441.80 8.63 0.00 0.00 3,812.32 1,137,440.34
256
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6017+940.00 0.0000 208.7380 0.00 426.32 10.00 0.00 0.00 4,263.22 1,133,177.12
6017+960.00 0.0000 207.9430 0.00 416.68 10.00 0.00 0.00 4,166.81 1,129,010.31
6017+980.00 0.0000 195.1810 0.00 403.12 10.00 0.00 0.00 4,031.24 1,124,979.07
6018+000.00 0.0000 182.3480 0.00 377.53 10.00 0.00 0.00 3,775.29 1,121,203.78
6018+020.00 0.0000 178.7030 0.00 361.05 10.00 0.00 0.00 3,610.51 1,117,593.27
6018+040.00 0.0000 164.5970 0.00 343.30 10.00 0.00 0.00 3,433.00 1,114,160.27
6018+052.74 0.0000 159.2340 0.00 323.83 6.37 0.00 0.00 2,063.29 1,112,096.98
6018+060.00 0.0000 155.6160 0.00 314.85 3.63 0.00 0.00 1,142.43 1,110,954.55
6018+080.00 0.0000 144.0570 0.00 299.67 10.00 0.00 0.00 2,996.73 1,107,957.82
6018+100.00 0.0000 144.6500 0.00 288.71 10.00 0.00 0.00 2,887.07 1,105,070.75
6018+120.00 0.0000 127.4580 0.00 272.11 10.00 0.00 0.00 2,721.08 1,102,349.67
6018+140.00 0.0000 128.6420 0.00 256.10 10.00 0.00 0.00 2,561.00 1,099,788.67
6018+160.00 0.0000 117.4620 0.00 246.10 10.00 0.00 0.00 2,461.04 1,097,327.63
6018+180.00 0.0000 111.4280 0.00 228.89 10.00 0.00 0.00 2,288.90 1,095,038.73
6018+200.00 0.0000 97.5990 0.00 209.03 10.00 0.00 0.00 2,090.27 1,092,948.46
6018+220.00 0.0000 90.3840 0.00 187.98 10.00 0.00 0.00 1,879.83 1,091,068.63
6018+240.00 0.0000 82.2900 0.00 172.67 10.00 0.00 0.00 1,726.74 1,089,341.89
6018+250.00 0.0000 85.3440 0.00 167.63 5.00 0.00 0.00 838.17 1,088,503.72
6018+250.00 0.0000 85.3450 0.00 170.69 0.00 0.00 0.00 0.09 1,088,503.63
6018+260.00 0.0000 83.7100 0.00 169.06 5.00 0.00 0.00 845.19 1,087,658.44
6018+280.00 0.0000 68.9460 0.00 152.66 10.00 0.00 0.00 1,526.56 1,086,131.88
6018+300.00 0.0000 61.9660 0.00 130.91 10.00 0.00 0.00 1,309.12 1,084,822.76
6018+320.00 0.0000 51.1200 0.00 113.09 10.00 0.00 0.00 1,130.86 1,083,691.90
6018+340.00 0.0000 48.3590 0.00 99.48 10.00 0.00 0.00 994.79 1,082,697.11
6018+360.00 0.0000 51.3250 0.00 99.68 10.00 0.00 0.00 996.84 1,081,700.27
6018+380.00 0.0000 50.7860 0.00 102.11 10.00 0.00 0.00 1,021.11 1,080,679.16
6018+400.00 0.0000 47.6840 0.00 98.47 10.00 0.00 0.00 984.70 1,079,694.46
6018+420.00 0.0000 44.9740 0.00 92.66 10.00 0.00 0.00 926.58 1,078,767.88
6018+440.00 0.0000 38.5770 0.00 83.55 10.00 0.00 0.00 835.51 1,077,932.37
6018+460.00 0.0000 33.1120 0.00 71.69 10.00 0.00 0.00 716.89 1,077,215.48
6018+480.00 0.0000 26.0270 0.00 59.14 10.00 0.00 0.00 591.39 1,076,624.09
6018+500.00 0.0000 27.7920 0.00 53.82 10.00 0.00 0.00 538.19 1,076,085.90
6018+520.00 0.0000 31.8420 0.00 59.63 10.00 0.00 0.00 596.34 1,075,489.56
6018+540.00 0.0000 29.6520 0.00 61.49 10.00 0.00 0.00 614.94 1,074,874.62
6018+560.00 0.0000 21.9980 0.00 51.65 10.00 0.00 0.00 516.50 1,074,358.12
6018+580.00 0.0000 18.1360 0.00 40.13 10.00 0.00 0.00 401.34 1,073,956.78
6018+600.00 0.0000 19.2840 0.00 37.42 10.00 0.00 0.00 374.20 1,073,582.58
6018+620.00 0.0000 20.4120 0.00 39.70 10.00 0.00 0.00 396.96 1,073,185.62
6018+640.00 0.0000 16.4620 0.00 36.87 10.00 0.00 0.00 368.74 1,072,816.88
6018+660.00 0.0000 15.6250 0.00 32.09 10.00 0.00 0.00 320.87 1,072,496.01
6018+680.00 0.0000 12.7060 0.00 28.33 10.00 0.00 0.00 283.31 1,072,212.70
6018+700.00 0.0000 18.3990 0.00 31.11 10.00 0.00 0.00 311.05 1,071,901.65
6018+720.00 0.0000 19.7230 0.00 38.12 10.00 0.00 0.00 381.22 1,071,520.43
6018+727.00 0.0000 17.9190 0.00 37.64 3.50 0.00 0.00 131.75 1,071,388.69
6018+740.00 0.0000 16.6790 0.00 34.60 6.50 0.00 0.00 224.89 1,071,163.80
257
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6018+747.00 0.0000 16.9900 0.00 33.67 3.50 0.00 0.00 117.84 1,071,045.96
6018+757.00 0.0000 16.9340 0.00 33.92 5.00 0.00 0.00 169.62 1,070,876.34
6018+760.00 0.0000 17.5950 0.00 34.53 1.50 0.00 0.00 51.79 1,070,824.54
6018+767.00 0.0000 19.5490 0.00 37.14 3.50 0.00 0.00 130.00 1,070,694.54
6018+777.00 0.0000 22.4920 0.00 42.04 5.00 0.00 0.00 210.21 1,070,484.34
6018+780.00 0.0000 20.7440 0.00 43.24 1.50 0.00 0.00 64.85 1,070,419.48
6018+787.00 0.0000 16.5480 0.00 37.29 3.50 0.00 0.00 130.52 1,070,288.96
6018+797.00 0.0000 11.6140 0.00 28.16 5.00 0.00 0.00 140.81 1,070,148.15
6018+800.00 0.0000 12.7020 0.00 24.32 1.50 0.00 0.00 36.47 1,070,111.68
6018+807.00 0.0000 15.4740 0.00 28.18 3.50 0.00 0.00 98.62 1,070,013.06
6018+817.00 0.0000 19.7500 0.00 35.22 5.00 0.00 0.00 176.12 1,069,836.94
6018+820.00 0.0000 20.1880 0.00 39.94 1.50 0.00 0.00 59.91 1,069,777.03
6018+827.00 0.0000 21.1980 0.00 41.39 3.50 0.00 0.00 144.85 1,069,632.18
6018+837.00 0.0000 22.2040 0.00 43.40 5.00 0.00 0.00 217.01 1,069,415.17
6018+840.00 0.0000 21.8170 0.00 44.02 1.50 0.00 0.00 66.03 1,069,349.14
6018+847.00 0.0000 20.6220 0.00 42.44 3.50 0.00 0.00 148.54 1,069,200.60
6018+857.00 0.0000 17.9170 0.00 38.54 5.00 0.00 0.00 192.70 1,069,007.91
6018+860.00 0.0000 16.9310 0.00 34.85 1.50 0.00 0.00 52.27 1,068,955.64
6018+867.00 0.4990 14.8600 0.50 31.79 3.50 1.75 2.27 111.27 1,068,846.64
6018+880.00 0.6620 12.4490 1.16 27.31 6.50 7.55 9.81 177.51 1,068,678.94
6018+900.00 0.0000 15.3360 0.66 27.79 10.00 6.62 8.61 277.85 1,068,409.70
6018+920.00 1.1380 6.3890 1.14 21.73 10.00 11.38 14.79 217.25 1,068,207.24
6018+940.00 5.3100 0.2410 6.45 6.63 10.00 64.48 83.82 66.30 1,068,224.76
6018+960.00 7.1060 0.2400 12.42 0.48 10.00 124.16 161.41 4.81 1,068,381.36
6018+980.00 1.0190 6.5070 8.13 6.75 10.00 81.25 105.63 67.47 1,068,419.52
6019+000.00 0.0000 6.9970 1.02 13.50 10.00 10.19 13.25 135.04 1,068,297.72
6019+020.00 0.0000 13.9790 0.00 20.98 10.00 0.00 0.00 209.76 1,068,087.96
6019+040.00 0.0000 14.2020 0.00 28.18 10.00 0.00 0.00 281.81 1,067,806.15
6019+060.00 0.0000 22.3530 0.00 36.56 10.00 0.00 0.00 365.55 1,067,440.60
6019+070.00 0.0000 23.9730 0.00 46.33 5.00 0.00 0.00 231.63 1,067,208.97
6019+070.00 0.0000 21.8850 0.00 45.86 0.00 0.00 0.00 0.00 1,067,208.97
6019+080.00 0.0000 21.9090 0.00 43.79 5.00 0.00 0.00 218.97 1,066,990.00
6019+100.00 0.0000 18.3340 0.00 40.24 10.00 0.00 0.00 402.43 1,066,587.57
6019+120.00 0.0000 26.4460 0.00 44.78 10.00 0.00 0.00 447.80 1,066,139.77
6019+140.00 0.0000 29.7420 0.00 56.19 10.00 0.00 0.00 561.88 1,065,577.89
6019+160.00 0.0000 31.5600 0.00 61.30 10.00 0.00 0.00 613.02 1,064,964.87
6019+160.00 0.0000 33.6030 0.00 65.16 0.00 0.00 0.00 0.00 1,064,964.87
6019+180.00 0.0000 26.4490 0.00 60.05 10.00 0.00 0.00 600.52 1,064,364.35
6019+200.00 6.8150 0.2220 6.82 26.67 10.00 68.15 88.60 266.71 1,064,186.24
6019+220.00 9.5370 0.2140 16.35 0.44 10.00 163.52 212.58 4.36 1,064,394.45
6019+240.00 0.0000 12.8710 9.54 13.09 10.00 95.37 123.98 130.85 1,064,387.59
6019+247.00 0.0000 15.6670 0.00 28.54 3.50 0.00 0.00 99.88 1,064,287.70
6019+257.00 0.0000 19.7290 0.00 35.40 5.00 0.00 0.00 176.98 1,064,110.72
6019+260.00 0.0000 21.1440 0.00 40.87 1.50 0.00 0.00 61.31 1,064,049.41
6019+267.00 0.0000 23.6400 0.00 44.78 3.50 0.00 0.00 156.74 1,063,892.67
258
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6019+277.00 0.0000 23.2830 0.00 46.92 5.00 0.00 0.00 234.62 1,063,658.05
6019+280.00 0.0000 23.2850 0.00 46.57 1.50 0.00 0.00 69.85 1,063,588.20
6019+287.00 0.0000 23.2100 0.00 46.50 3.50 0.00 0.00 162.73 1,063,425.47
6019+297.00 0.0000 22.4450 0.00 45.66 5.00 0.00 0.00 228.28 1,063,197.19
6019+300.00 0.0000 21.6740 0.00 44.12 1.50 0.00 0.00 66.18 1,063,131.02
6019+307.00 0.0000 19.7530 0.00 41.43 3.50 0.00 0.00 144.99 1,062,986.02
6019+317.00 0.0000 17.3170 0.00 37.07 5.00 0.00 0.00 185.35 1,062,800.67
6019+320.00 0.0000 18.1450 0.00 35.46 1.50 0.00 0.00 53.19 1,062,747.48
6019+327.00 0.0000 19.8940 0.00 38.04 3.50 0.00 0.00 133.14 1,062,614.34
6019+337.00 0.0000 21.8730 0.00 41.77 5.00 0.00 0.00 208.84 1,062,405.51
6019+340.00 0.0000 21.8480 0.00 43.72 1.50 0.00 0.00 65.58 1,062,339.93
6019+347.00 0.0000 21.6800 0.00 43.53 3.50 0.00 0.00 152.35 1,062,187.58
6019+357.00 0.0000 21.6310 0.00 43.31 5.00 0.00 0.00 216.56 1,061,971.02
6019+360.00 0.0000 22.2620 0.00 43.89 1.50 0.00 0.00 65.84 1,061,905.18
6019+366.83 0.0000 23.7820 0.00 46.04 3.42 0.00 0.00 157.31 1,061,747.87
6019+380.00 0.0000 25.8240 0.00 49.61 6.58 0.00 0.00 326.58 1,061,421.29
6019+386.83 0.0000 26.2160 0.00 52.04 3.42 0.00 0.00 177.79 1,061,243.50
6019+400.00 0.0000 26.3320 0.00 52.55 6.58 0.00 0.00 345.95 1,060,897.55
6019+420.00 0.0000 23.8240 0.00 50.16 10.00 0.00 0.00 501.56 1,060,395.99
6019+440.00 0.0000 16.5750 0.00 40.40 10.00 0.00 0.00 403.99 1,059,992.00
6019+460.00 0.0000 16.0370 0.00 32.61 10.00 0.00 0.00 326.12 1,059,665.88
6019+480.00 0.0000 9.4250 0.00 25.46 10.00 0.00 0.00 254.62 1,059,411.26
6019+500.00 0.0000 15.7860 0.00 25.21 10.00 0.00 0.00 252.11 1,059,159.15
6019+520.00 0.0000 21.4550 0.00 37.24 10.00 0.00 0.00 372.41 1,058,786.74
6019+540.00 0.0000 22.6850 0.00 44.14 10.00 0.00 0.00 441.40 1,058,345.34
6019+560.00 0.0000 21.6610 0.00 44.35 10.00 0.00 0.00 443.46 1,057,901.88
6019+570.00 0.0000 18.2220 0.00 39.88 5.00 0.00 0.00 199.42 1,057,702.46
6019+580.00 0.0000 15.8050 0.00 34.03 5.00 0.00 0.00 170.14 1,057,532.33
6019+590.00 0.0000 15.4480 0.00 31.25 5.00 0.00 0.00 156.27 1,057,376.06
6019+600.00 0.0000 15.5750 0.00 31.02 5.00 0.00 0.00 155.12 1,057,220.95
6019+610.00 0.0000 14.4200 0.00 30.00 5.00 0.00 0.00 149.98 1,057,070.97
6019+620.00 0.0000 14.7360 0.00 29.16 5.00 0.00 0.00 145.78 1,056,925.19
6019+630.00 0.0000 17.8540 0.00 32.59 5.00 0.00 0.00 162.95 1,056,762.24
6019+640.00 0.0000 21.5460 0.00 39.40 5.00 0.00 0.00 197.00 1,056,565.24
6019+650.00 0.0000 25.3210 0.00 46.87 5.00 0.00 0.00 234.34 1,056,330.91
6019+660.00 0.0000 27.9000 0.00 53.22 5.00 0.00 0.00 266.11 1,056,064.80
6019+670.00 0.0000 28.8320 0.00 56.73 5.00 0.00 0.00 283.66 1,055,781.14
6019+680.00 0.0000 28.2020 0.00 57.03 5.00 0.00 0.00 285.17 1,055,495.97
6019+690.00 0.0000 24.4450 0.00 52.65 5.00 0.00 0.00 263.24 1,055,232.74
6019+700.00 0.0000 22.6900 0.00 47.14 5.00 0.00 0.00 235.68 1,054,997.06
6019+710.00 0.0000 24.5980 0.00 47.29 5.00 0.00 0.00 236.44 1,054,760.62
6019+720.00 0.0000 25.8720 0.00 50.47 5.00 0.00 0.00 252.35 1,054,508.27
6019+730.00 0.0000 25.9420 0.00 51.81 5.00 0.00 0.00 259.07 1,054,249.20
6019+740.00 0.0000 22.7820 0.00 48.72 5.00 0.00 0.00 243.62 1,054,005.58
6019+750.00 0.0000 14.0370 0.00 36.82 5.00 0.00 0.00 184.10 1,053,821.49
259
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6019+760.00 0.3390 6.5520 0.34 20.59 5.00 1.70 2.20 102.95 1,053,720.75
6019+770.00 1.5150 1.3260 1.85 7.88 5.00 9.27 12.05 39.39 1,053,693.41
6019+780.00 1.5010 3.2030 3.02 4.53 5.00 15.08 19.60 22.65 1,053,690.37
6019+800.00 0.0000 23.9430 1.50 27.15 10.00 15.01 19.51 271.46 1,053,438.42
6019+820.00 0.0000 32.3080 0.00 56.25 10.00 0.00 0.00 562.51 1,052,875.91
6019+840.00 0.0000 29.3070 0.00 61.62 10.00 0.00 0.00 616.15 1,052,259.76
6019+860.00 0.0000 32.2450 0.00 61.55 10.00 0.00 0.00 615.52 1,051,644.24
6019+880.00 0.0000 30.7510 0.00 63.00 10.00 0.00 0.00 629.96 1,051,014.28
6019+900.00 0.0000 24.3220 0.00 55.07 10.00 0.00 0.00 550.73 1,050,463.55
6019+920.00 0.0000 30.9230 0.00 55.25 10.00 0.00 0.00 552.45 1,049,911.10
6019+940.00 0.0000 33.7010 0.00 64.62 10.00 0.00 0.00 646.24 1,049,264.86
6019+960.00 0.0000 28.5140 0.00 62.22 10.00 0.00 0.00 622.15 1,048,642.71
6019+980.00 0.0000 26.0240 0.00 54.54 10.00 0.00 0.00 545.38 1,048,097.33
6020+000.00 0.0000 32.3550 0.00 58.38 10.00 0.00 0.00 583.79 1,047,513.54
6020+020.00 0.0000 25.8860 0.00 58.24 10.00 0.00 0.00 582.41 1,046,931.13
6020+040.00 0.0000 11.0870 0.00 36.97 10.00 0.00 0.00 369.73 1,046,561.40
6020+060.00 2.7910 2.4150 2.79 13.50 10.00 27.91 36.28 135.02 1,046,462.66
6020+080.00 0.5060 10.1460 3.30 12.56 10.00 32.97 42.86 125.61 1,046,379.91
6020+100.00 0.0000 15.8620 0.51 26.01 10.00 5.06 6.58 260.08 1,046,126.41
6020+120.00 0.0000 23.4420 0.00 39.30 10.00 0.00 0.00 393.04 1,045,733.37
6020+140.00 0.0000 31.0640 0.00 54.51 10.00 0.00 0.00 545.06 1,045,188.31
6020+160.00 0.0000 33.8470 0.00 64.91 10.00 0.00 0.00 649.11 1,044,539.20
6020+180.00 0.0000 24.2580 0.00 58.11 10.00 0.00 0.00 581.05 1,043,958.15
6020+200.00 0.0000 29.0650 0.00 53.32 10.00 0.00 0.00 533.23 1,043,424.92
6020+220.00 0.0000 17.9700 0.00 47.04 10.00 0.00 0.00 470.35 1,042,954.57
6020+240.00 0.0000 25.0680 0.00 43.04 10.00 0.00 0.00 430.38 1,042,524.19
6020+260.00 0.0000 34.0590 0.00 59.13 10.00 0.00 0.00 591.27 1,041,932.92
6020+280.00 0.0000 37.7420 0.00 71.80 10.00 0.00 0.00 718.01 1,041,214.91
6020+300.00 0.0000 20.0190 0.00 57.76 10.00 0.00 0.00 577.61 1,040,637.30
6020+320.00 0.0000 14.4340 0.00 34.45 10.00 0.00 0.00 344.53 1,040,292.77
6020+340.00 0.0000 26.8820 0.00 41.32 10.00 0.00 0.00 413.16 1,039,879.61
6020+360.00 0.0000 36.4580 0.00 63.34 10.00 0.00 0.00 633.40 1,039,246.21
6020+380.00 0.0000 29.3230 0.00 65.78 10.00 0.00 0.00 657.81 1,038,588.40
6020+400.00 0.0000 38.1040 0.00 67.43 10.00 0.00 0.00 674.27 1,037,914.13
6020+420.00 0.0000 41.5100 0.00 79.61 10.00 0.00 0.00 796.14 1,037,117.99
6020+440.00 0.0000 47.6700 0.00 89.18 10.00 0.00 0.00 891.80 1,036,226.19
6020+460.00 0.0000 50.7100 0.00 98.38 10.00 0.00 0.00 983.80 1,035,242.39
6020+480.00 0.0000 30.9000 0.00 81.61 10.00 0.00 0.00 816.10 1,034,426.29
6020+500.00 0.0000 33.1950 0.00 64.10 10.00 0.00 0.00 640.95 1,033,785.34
6020+520.00 0.0000 35.1210 0.00 68.32 10.00 0.00 0.00 683.16 1,033,102.18
6020+540.00 0.0000 34.7950 0.00 69.92 10.00 0.00 0.00 699.16 1,032,403.02
6020+560.00 0.0000 38.6890 0.00 73.48 10.00 0.00 0.00 734.84 1,031,668.18
6020+580.00 0.0000 32.2390 0.00 70.93 10.00 0.00 0.00 709.28 1,030,958.90
6020+600.00 0.0000 28.9060 0.00 61.15 10.00 0.00 0.00 611.45 1,030,347.45
6020+620.00 0.0000 40.5840 0.00 69.49 10.00 0.00 0.00 694.90 1,029,652.55
260
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6020+640.00 0.0000 33.9510 0.00 74.54 10.00 0.00 0.00 745.35 1,028,907.20
6020+660.00 0.0000 23.8220 0.00 57.77 10.00 0.00 0.00 577.73 1,028,329.47
6020+680.00 0.0000 16.0510 0.00 39.87 10.00 0.00 0.00 398.73 1,027,930.74
6020+700.00 0.0000 21.9810 0.00 38.03 10.00 0.00 0.00 380.32 1,027,550.42
6020+720.00 0.0000 28.4060 0.00 50.39 10.00 0.00 0.00 503.87 1,027,046.55
6020+740.00 0.0000 30.2650 0.00 58.67 10.00 0.00 0.00 586.71 1,026,459.84
6020+760.00 0.0000 38.8740 0.00 69.14 10.00 0.00 0.00 691.39 1,025,768.45
6020+780.00 0.0000 25.8950 0.00 64.77 10.00 0.00 0.00 647.69 1,025,120.76
6020+800.00 0.0000 27.6670 0.00 53.56 10.00 0.00 0.00 535.62 1,024,585.14
6020+820.00 0.0000 31.6400 0.00 59.31 10.00 0.00 0.00 593.07 1,023,992.07
6020+840.00 0.0000 23.7800 0.00 55.42 10.00 0.00 0.00 554.20 1,023,437.87
6020+860.00 0.6620 14.0530 0.66 37.83 10.00 6.62 8.61 378.33 1,023,068.15
6020+880.00 0.0000 22.1690 0.66 36.22 10.00 6.62 8.61 362.22 1,022,714.53
6020+880.00 0.0000 21.2490 0.00 43.42 0.00 0.00 0.00 0.00 1,022,714.53
6020+900.00 0.0000 32.0190 0.00 53.27 10.00 0.00 0.00 532.68 1,022,181.85
6020+920.00 0.0000 36.2770 0.00 68.30 10.00 0.00 0.00 682.96 1,021,498.89
6020+940.00 0.0000 32.8740 0.00 69.15 10.00 0.00 0.00 691.51 1,020,807.38
6020+960.00 0.0000 33.5420 0.00 66.42 10.00 0.00 0.00 664.16 1,020,143.22
6020+980.00 0.0000 31.8590 0.00 65.40 10.00 0.00 0.00 654.01 1,019,489.21
6021+000.00 0.0000 35.1010 0.00 66.96 10.00 0.00 0.00 669.60 1,018,819.61
6021+020.00 0.0000 17.5560 0.00 52.66 10.00 0.00 0.00 526.57 1,018,293.04
6021+040.00 0.0000 6.2530 0.00 23.81 10.00 0.00 0.00 238.09 1,018,054.95
6021+060.00 9.0650 0.1840 9.07 6.44 10.00 90.65 117.85 64.37 1,018,108.43
6021+080.00 3.8180 0.6140 12.88 0.80 10.00 128.83 167.48 7.98 1,018,267.93
6021+100.00 0.0000 21.1560 3.82 21.77 10.00 38.18 49.63 217.70 1,018,099.86
6021+120.00 0.0000 24.4840 0.00 45.64 10.00 0.00 0.00 456.40 1,017,643.46
6021+140.00 0.0000 23.8030 0.00 48.29 10.00 0.00 0.00 482.87 1,017,160.59
6021+160.00 0.0000 26.7500 0.00 50.55 10.00 0.00 0.00 505.53 1,016,655.06
6021+180.00 0.0000 39.1770 0.00 65.93 10.00 0.00 0.00 659.27 1,015,995.79
6021+200.00 0.0000 32.6200 0.00 71.80 10.00 0.00 0.00 717.97 1,015,277.82
6021+220.00 0.0000 20.5760 0.00 53.20 10.00 0.00 0.00 531.96 1,014,745.86
6021+240.00 0.0000 28.3770 0.00 48.95 10.00 0.00 0.00 489.53 1,014,256.33
6021+250.00 0.0000 31.3170 0.00 59.69 5.00 0.00 0.00 298.47 1,013,957.86
6021+260.00 0.0000 32.5130 0.00 63.83 5.00 0.00 0.00 319.15 1,013,638.71
6021+270.00 0.0000 31.8780 0.00 64.39 5.00 0.00 0.00 321.96 1,013,316.76
6021+280.00 0.0000 28.3530 0.00 60.23 5.00 0.00 0.00 301.16 1,013,015.60
6021+290.00 0.0000 23.4590 0.00 51.81 5.00 0.00 0.00 259.06 1,012,756.54
6021+300.00 0.0000 25.9970 0.00 49.46 5.00 0.00 0.00 247.28 1,012,509.26
6021+310.00 0.0000 32.6930 0.00 58.69 5.00 0.00 0.00 293.45 1,012,215.81
6021+320.00 0.0000 31.5210 0.00 64.21 5.00 0.00 0.00 321.07 1,011,894.74
6021+330.00 0.0000 27.5040 0.00 59.03 5.00 0.00 0.00 295.13 1,011,599.62
6021+340.00 0.0000 19.7050 0.00 47.21 5.00 0.00 0.00 236.05 1,011,363.57
6021+350.00 0.0000 15.5890 0.00 35.29 5.00 0.00 0.00 176.47 1,011,187.10
6021+360.00 0.0000 17.8710 0.00 33.46 5.00 0.00 0.00 167.30 1,011,019.80
6021+370.00 0.0000 17.3270 0.00 35.20 5.00 0.00 0.00 175.99 1,010,843.81
261
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6021+380.00 0.0000 11.5220 0.00 28.85 5.00 0.00 0.00 144.25 1,010,699.57
6021+390.00 0.0000 11.1050 0.00 22.63 5.00 0.00 0.00 113.14 1,010,586.43
6021+400.00 0.0000 15.4190 0.00 26.52 5.00 0.00 0.00 132.62 1,010,453.81
6021+409.97 0.0000 18.1180 0.00 33.54 4.99 0.00 0.00 167.20 1,010,286.61
6021+420.00 0.0000 19.6300 0.00 37.75 5.01 0.00 0.00 189.29 1,010,097.33
6021+429.97 0.0000 18.0620 0.00 37.69 4.99 0.00 0.00 187.91 1,009,909.41
6021+440.00 0.0000 15.3680 0.00 33.43 5.01 0.00 0.00 167.63 1,009,741.78
6021+455.00 0.0000 14.0990 0.00 29.47 7.50 0.00 0.00 221.00 1,009,520.78
6021+455.00 0.0000 12.7390 0.00 26.84 0.00 0.00 0.00 0.00 1,009,520.78
6021+460.00 0.0000 12.7530 0.00 25.49 2.50 0.00 0.00 63.73 1,009,457.05
6021+480.00 0.0000 12.0950 0.00 24.85 10.00 0.00 0.00 248.48 1,009,208.57
6021+500.00 0.0000 20.3050 0.00 32.40 10.00 0.00 0.00 324.00 1,008,884.57
6021+520.00 0.0000 24.3460 0.00 44.65 10.00 0.00 0.00 446.51 1,008,438.06
6021+540.00 0.0000 21.4110 0.00 45.76 10.00 0.00 0.00 457.57 1,007,980.49
6021+560.00 0.0000 16.1850 0.00 37.60 10.00 0.00 0.00 375.96 1,007,604.53
6021+580.00 0.0000 19.1900 0.00 35.38 10.00 0.00 0.00 353.75 1,007,250.78
6021+600.00 0.0000 15.2210 0.00 34.41 10.00 0.00 0.00 344.11 1,006,906.67
6021+620.00 0.0000 19.1650 0.00 34.39 10.00 0.00 0.00 343.86 1,006,562.81
6021+640.00 0.0000 19.3570 0.00 38.52 10.00 0.00 0.00 385.22 1,006,177.59
6021+660.00 0.0000 18.6210 0.00 37.98 10.00 0.00 0.00 379.78 1,005,797.81
6021+680.00 0.0000 23.4090 0.00 42.03 10.00 0.00 0.00 420.30 1,005,377.51
6021+700.00 0.0000 27.4830 0.00 50.89 10.00 0.00 0.00 508.92 1,004,868.59
6021+702.74 0.0000 27.1610 0.00 54.64 1.37 0.00 0.00 74.89 1,004,793.70
6021+720.00 0.0000 22.2720 0.00 49.43 8.63 0.00 0.00 426.58 1,004,367.11
6021+740.00 0.0000 20.6090 0.00 42.88 10.00 0.00 0.00 428.81 1,003,938.30
6021+760.00 0.0000 31.2510 0.00 51.86 10.00 0.00 0.00 518.60 1,003,419.70
6021+775.00 0.0000 38.0990 0.00 69.35 7.50 0.00 0.00 520.13 1,002,899.58
6021+775.00 0.0000 38.0990 0.00 76.20 0.00 0.00 0.00 0.00 1,002,899.58
6021+780.00 0.0000 37.8580 0.00 75.96 2.50 0.00 0.00 189.89 1,002,709.69
6021+800.00 0.0000 33.4830 0.00 71.34 10.00 0.00 0.00 713.41 1,001,996.28
6021+820.00 0.0000 28.6890 0.00 62.17 10.00 0.00 0.00 621.72 1,001,374.56
6021+840.00 0.0000 27.4910 0.00 56.18 10.00 0.00 0.00 561.80 1,000,812.76
6021+852.74 0.0000 26.7070 0.00 54.20 6.37 0.00 0.00 345.30 1,000,467.46
6021+860.00 0.0000 25.5980 0.00 52.31 3.63 0.00 0.00 189.81 1,000,277.65
6021+880.00 0.0000 19.5120 0.00 45.11 10.00 0.00 0.00 451.10 999,826.55
6021+900.00 0.0000 10.7410 0.00 30.25 10.00 0.00 0.00 302.53 999,524.02
6021+920.00 0.0000 21.8540 0.00 32.60 10.00 0.00 0.00 325.95 999,198.07
6021+940.00 0.0000 29.3650 0.00 51.22 10.00 0.00 0.00 512.19 998,685.88
6021+960.00 0.0000 32.6670 0.00 62.03 10.00 0.00 0.00 620.32 998,065.56
6021+980.00 0.0000 17.8010 0.00 50.47 10.00 0.00 0.00 504.68 997,560.88
6022+000.00 0.0000 25.5260 0.00 43.33 10.00 0.00 0.00 433.27 997,127.61
6022+020.00 0.0000 28.7980 0.00 54.32 10.00 0.00 0.00 543.24 996,584.37
6022+040.00 0.0000 24.0390 0.00 52.84 10.00 0.00 0.00 528.37 996,056.00
6022+060.00 0.0000 15.7830 0.00 39.82 10.00 0.00 0.00 398.22 995,657.78
6022+080.00 0.0000 16.1060 0.00 31.89 10.00 0.00 0.00 318.89 995,338.89
262
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6022+095.00 0.0000 16.0220 0.00 32.13 7.50 0.00 0.00 240.96 995,097.93
6022+095.00 0.0000 19.1100 0.00 35.13 0.00 0.00 0.00 0.00 995,097.93
6022+100.00 0.0000 16.6090 0.00 35.72 2.50 0.00 0.00 89.30 995,008.63
6022+100.00 0.0000 16.6090 0.00 33.22 0.00 0.00 0.00 0.02 995,008.61
6022+120.00 0.0000 6.5400 0.00 23.15 10.00 0.00 0.00 231.48 994,777.13
6022+140.00 1.8880 1.3320 1.89 7.87 10.00 18.88 24.54 78.72 994,722.96
6022+160.00 0.0000 6.9110 1.89 8.24 10.00 18.88 24.54 82.43 994,665.07
6022+170.00 1.3870 0.8920 1.39 7.80 5.00 6.94 9.02 39.02 994,635.07
6022+170.00 1.4700 0.6530 2.86 1.55 0.00 0.00 0.00 0.00 994,635.07
6022+180.00 5.7060 0.2800 7.18 0.93 5.00 35.88 46.64 4.67 994,677.05
6022+200.00 0.8130 4.5340 6.52 4.81 10.00 65.19 84.75 48.14 994,713.66
6022+220.00 0.0000 8.0480 0.81 12.58 10.00 8.13 10.57 125.82 994,598.41
6022+240.00 0.3170 5.1250 0.32 13.17 10.00 3.17 4.12 131.73 994,470.80
6022+260.00 0.0000 9.7810 0.32 14.91 10.00 3.17 4.12 149.06 994,325.86
6022+280.00 0.0000 13.5470 0.00 23.33 10.00 0.00 0.00 233.28 994,092.58
6022+300.00 0.0000 18.6600 0.00 32.21 10.00 0.00 0.00 322.07 993,770.51
6022+320.00 0.0000 19.2310 0.00 37.89 10.00 0.00 0.00 378.91 993,391.60
6022+340.00 0.0000 14.5470 0.00 33.78 10.00 0.00 0.00 337.78 993,053.82
6022+360.00 0.0000 12.3000 0.00 26.85 10.00 0.00 0.00 268.47 992,785.35
6022+380.00 0.0000 16.9620 0.00 29.26 10.00 0.00 0.00 292.62 992,492.73
6022+400.00 0.0000 22.5280 0.00 39.49 10.00 0.00 0.00 394.90 992,097.83
6022+420.00 0.0000 0.0040 0.00 22.53 10.00 0.00 0.00 225.32 991,872.51
6022+440.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,872.43
6022+460.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,872.34
6022+480.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 991,872.24
6022+500.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,872.15
6022+520.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,872.06
6022+540.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 991,871.96
6022+560.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,871.87
6022+580.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,871.78
6022+600.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 991,871.70
6022+620.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 991,871.62
6022+640.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 991,871.55
6022+660.00 0.0010 0.0050 0.00 0.01 10.00 0.02 0.03 0.09 991,871.48
6022+680.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 991,871.41
6022+700.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,871.32
6022+720.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,871.23
6022+740.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,871.15
6022+760.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,871.07
6022+780.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,870.98
6022+800.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,870.89
6022+820.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,870.81
6022+840.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,870.73
6022+860.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,870.66
6022+880.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,870.59
263
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6022+900.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,870.51
6022+920.00 0.0010 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 991,870.44
6022+940.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.09 991,870.37
6022+960.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 991,870.32
6022+980.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,870.25
6023+000.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,870.18
6023+020.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 991,870.13
6023+040.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,870.06
6023+060.00 0.0010 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 991,869.99
6023+080.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.09 991,869.92
6023+100.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,869.85
6023+120.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,869.77
6023+140.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,869.68
6023+160.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 991,869.58
6023+180.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,869.49
6023+200.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,869.41
6023+220.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,869.33
6023+240.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,869.24
6023+260.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,869.15
6023+280.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,869.07
6023+300.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,868.99
6023+320.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,868.91
6023+340.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,868.85
6023+360.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,868.78
6023+380.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,868.69
6023+400.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,868.60
6023+420.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,868.52
6023+440.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,868.44
6023+460.00 0.0000 0.0060 0.00 0.01 10.00 0.00 0.00 0.10 991,868.34
6023+480.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.10 991,868.24
6023+500.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,868.17
6023+520.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 991,868.10
6023+540.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,868.01
6023+560.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,867.93
6023+580.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,867.85
6023+600.00 0.0010 0.0060 0.00 0.01 10.00 0.01 0.01 0.10 991,867.76
6023+620.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.10 991,867.69
6023+640.00 0.0010 0.0050 0.00 0.01 10.00 0.02 0.03 0.09 991,867.62
6023+660.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 991,867.54
6023+680.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,867.46
6023+700.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,867.40
6023+720.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,867.33
6023+740.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,867.26
6023+760.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,867.20
6023+780.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,867.12
264
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6023+800.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,867.05
6023+820.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 991,866.98
6023+840.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 991,866.90
6023+860.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 991,866.81
6023+880.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 991,866.72
6023+880.00 0.0010 0.0040 0.00 0.01 0.00 0.00 0.00 0.00 991,866.72
6023+900.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 991,866.65
6023+920.00 0.0000 24.1310 0.00 24.14 10.00 0.00 0.00 241.36 991,625.29
6023+940.00 0.0000 26.1610 0.00 50.29 10.00 0.00 0.00 502.92 991,122.37
6023+960.00 0.0000 23.7450 0.00 49.91 10.00 0.00 0.00 499.06 990,623.31
6023+980.00 0.0000 24.4690 0.00 48.21 10.00 0.00 0.00 482.14 990,141.17
6024+000.00 0.0000 25.1910 0.00 49.66 10.00 0.00 0.00 496.60 989,644.57
6024+020.00 0.0000 11.9660 0.00 37.16 10.00 0.00 0.00 371.57 989,273.00
6024+040.00 0.0000 15.7570 0.00 27.72 10.00 0.00 0.00 277.23 988,995.77
6024+049.07 0.0000 12.1250 0.00 27.88 4.54 0.00 0.00 126.46 988,869.31
6024+060.00 0.0000 16.5920 0.00 28.72 5.46 0.00 0.00 156.92 988,712.38
6024+080.00 0.0000 28.2640 0.00 44.86 10.00 0.00 0.00 448.56 988,263.82
6024+100.00 0.0000 29.2280 0.00 57.49 10.00 0.00 0.00 574.92 987,688.90
6024+120.00 0.0000 29.8150 0.00 59.04 10.00 0.00 0.00 590.43 987,098.47
6024+140.00 0.0000 34.3190 0.00 64.13 10.00 0.00 0.00 641.34 986,457.13
6024+160.00 0.0000 37.0580 0.00 71.38 10.00 0.00 0.00 713.77 985,743.36
6024+180.00 0.0000 30.5700 0.00 67.63 10.00 0.00 0.00 676.28 985,067.08
6024+199.07 0.0000 10.5940 0.00 41.16 9.54 0.00 0.00 392.52 984,674.56
6024+200.00 0.0000 9.4800 0.00 20.07 0.46 0.00 0.00 9.32 984,665.24
6024+220.00 4.7210 0.2320 4.72 9.71 10.00 47.21 61.37 97.12 984,629.49
6024+240.00 0.4020 3.5980 5.12 3.83 10.00 51.23 66.60 38.30 984,657.79
6024+260.00 0.0000 11.4590 0.40 15.06 10.00 4.02 5.23 150.57 984,512.45
6024+270.00 0.0000 13.4540 0.00 24.91 5.00 0.00 0.00 124.57 984,387.88
6024+270.00 0.0000 12.0890 0.00 25.54 0.00 0.00 0.00 0.00 984,387.88
6024+280.00 0.0000 16.3300 0.00 28.42 5.00 0.00 0.00 142.10 984,245.79
6024+300.00 0.0000 16.6670 0.00 33.00 10.00 0.00 0.00 329.97 983,915.82
6024+316.48 0.0000 16.9190 0.00 33.59 8.24 0.00 0.00 276.82 983,639.00
6024+320.00 0.0000 17.9920 0.00 34.91 1.76 0.00 0.00 61.37 983,577.63
6024+340.00 0.0000 16.0790 0.00 34.07 10.00 0.00 0.00 340.71 983,236.92
6024+360.00 0.0000 12.2100 0.00 28.29 10.00 0.00 0.00 282.89 982,954.03
6024+376.40 0.0000 14.4020 0.00 26.61 8.20 0.00 0.00 218.23 982,735.80
6024+376.40 0.0000 18.4950 1,300,000.00
6024+380.00 0.0000 19.2910 0.00 37.79 1.80 0.00 0.00 68.00 1,299,932.00
6024+400.00 0.0000 16.9820 0.00 36.27 10.00 0.00 0.00 362.73 1,299,569.27
6024+420.00 0.0000 13.3590 0.00 30.34 10.00 0.00 0.00 303.41 1,299,265.86
6024+440.00 0.0000 11.7480 0.00 25.11 10.00 0.00 0.00 251.07 1,299,014.79
6024+460.00 0.0000 16.2160 0.00 27.96 10.00 0.00 0.00 279.64 1,298,735.15
6024+480.00 0.0000 29.5570 0.00 45.77 10.00 0.00 0.00 457.73 1,298,277.42
6024+500.00 0.0000 32.0310 0.00 61.59 10.00 0.00 0.00 615.88 1,297,661.54
6024+520.00 0.0000 14.9940 0.00 47.03 10.00 0.00 0.00 470.25 1,297,191.29
265
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6024+540.00 0.0000 11.5240 0.00 26.52 10.00 0.00 0.00 265.18 1,296,926.11
6024+560.00 0.0000 13.6040 0.00 25.13 10.00 0.00 0.00 251.28 1,296,674.83
6024+580.00 0.0000 24.1930 0.00 37.80 10.00 0.00 0.00 377.97 1,296,296.86
6024+600.00 0.0000 26.9690 0.00 51.16 10.00 0.00 0.00 511.62 1,295,785.24
6024+620.00 0.0000 26.9230 0.00 53.89 10.00 0.00 0.00 538.92 1,295,246.32
6024+640.00 0.0000 16.6840 0.00 43.61 10.00 0.00 0.00 436.07 1,294,810.25
6024+660.00 0.7600 11.8650 0.76 28.55 10.00 7.60 9.88 285.49 1,294,534.64
6024+680.00 0.0000 16.6720 0.76 28.54 10.00 7.60 9.88 285.37 1,294,259.15
6024+700.00 0.0000 22.9990 0.00 39.67 10.00 0.00 0.00 396.71 1,293,862.44
6024+720.00 0.0000 24.3060 0.00 47.31 10.00 0.00 0.00 473.05 1,293,389.39
6024+740.00 0.0000 30.9970 0.00 55.30 10.00 0.00 0.00 553.03 1,292,836.36
6024+760.00 0.0000 26.5780 0.00 57.58 10.00 0.00 0.00 575.75 1,292,260.61
6024+780.00 0.0000 32.5330 0.00 59.11 10.00 0.00 0.00 591.11 1,291,669.50
6024+800.00 0.0000 28.2760 0.00 60.81 10.00 0.00 0.00 608.09 1,291,061.41
6024+820.00 0.0000 21.9940 0.00 50.27 10.00 0.00 0.00 502.70 1,290,558.71
6024+840.00 0.0000 26.3930 0.00 48.39 10.00 0.00 0.00 483.87 1,290,074.84
6024+860.00 0.0000 19.0270 0.00 45.42 10.00 0.00 0.00 454.20 1,289,620.64
6024+880.00 0.0000 18.1300 0.00 37.16 10.00 0.00 0.00 371.57 1,289,249.07
6024+900.00 0.0000 20.5420 0.00 38.67 10.00 0.00 0.00 386.72 1,288,862.35
6024+920.00 0.0000 23.6660 0.00 44.21 10.00 0.00 0.00 442.08 1,288,420.27
6024+940.00 0.0000 27.3040 0.00 50.97 10.00 0.00 0.00 509.70 1,287,910.57
6024+960.00 0.0000 27.9140 0.00 55.22 10.00 0.00 0.00 552.18 1,287,358.39
6024+980.00 0.0000 25.2360 0.00 53.15 10.00 0.00 0.00 531.50 1,286,826.89
6025+000.00 0.0000 26.4230 0.00 51.66 10.00 0.00 0.00 516.59 1,286,310.30
6025+020.00 0.0000 32.6180 0.00 59.04 10.00 0.00 0.00 590.41 1,285,719.89
6025+040.00 0.0000 28.9310 0.00 61.55 10.00 0.00 0.00 615.49 1,285,104.40
6025+060.00 0.0000 17.8560 0.00 46.79 10.00 0.00 0.00 467.87 1,284,636.53
6025+080.00 0.0000 14.4010 0.00 32.26 10.00 0.00 0.00 322.57 1,284,313.96
6025+100.00 0.0000 18.3810 0.00 32.78 10.00 0.00 0.00 327.82 1,283,986.14
6025+120.00 0.0000 27.0450 0.00 45.43 10.00 0.00 0.00 454.26 1,283,531.88
6025+140.00 0.0000 28.0780 0.00 55.12 10.00 0.00 0.00 551.23 1,282,980.65
6025+160.00 0.0000 31.5390 0.00 59.62 10.00 0.00 0.00 596.17 1,282,384.48
6025+180.00 0.0000 26.0120 0.00 57.55 10.00 0.00 0.00 575.51 1,281,808.97
6025+200.00 0.0000 14.4510 0.00 40.46 10.00 0.00 0.00 404.63 1,281,404.34
6025+220.00 0.0000 20.5790 0.00 35.03 10.00 0.00 0.00 350.30 1,281,054.04
6025+240.00 0.0000 27.2420 0.00 47.82 10.00 0.00 0.00 478.21 1,280,575.83
6025+260.00 0.0000 37.4420 0.00 64.68 10.00 0.00 0.00 646.84 1,279,928.99
6025+280.00 0.0000 35.2090 0.00 72.65 10.00 0.00 0.00 726.51 1,279,202.48
6025+300.00 0.0000 36.3870 0.00 71.60 10.00 0.00 0.00 715.96 1,278,486.52
6025+320.00 0.0000 35.2830 0.00 71.67 10.00 0.00 0.00 716.70 1,277,769.82
6025+340.00 0.0000 41.2720 0.00 76.56 10.00 0.00 0.00 765.55 1,277,004.27
6025+360.00 0.0000 40.7630 0.00 82.04 10.00 0.00 0.00 820.35 1,276,183.92
6025+380.00 0.0000 32.7150 0.00 73.48 10.00 0.00 0.00 734.78 1,275,449.14
6025+400.00 0.0000 28.9010 0.00 61.62 10.00 0.00 0.00 616.16 1,274,832.98
6025+420.00 0.0000 22.8320 0.00 51.73 10.00 0.00 0.00 517.33 1,274,315.65
266
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6025+440.00 0.0000 21.1810 0.00 44.01 10.00 0.00 0.00 440.13 1,273,875.52
6025+460.00 0.0000 27.4260 0.00 48.61 10.00 0.00 0.00 486.07 1,273,389.45
6025+480.00 0.0000 22.8600 0.00 50.29 10.00 0.00 0.00 502.86 1,272,886.59
6025+500.00 0.0000 30.1990 0.00 53.06 10.00 0.00 0.00 530.59 1,272,356.00
6025+520.00 0.0000 27.7290 0.00 57.93 10.00 0.00 0.00 579.28 1,271,776.72
6025+540.00 0.0000 36.1940 0.00 63.92 10.00 0.00 0.00 639.23 1,271,137.49
6025+560.00 0.0000 29.1140 0.00 65.31 10.00 0.00 0.00 653.08 1,270,484.41
6025+580.00 0.0000 26.2360 0.00 55.35 10.00 0.00 0.00 553.50 1,269,930.91
6025+580.00 0.0000 24.6300 0.00 50.87 0.00 0.00 0.00 0.00 1,269,930.91
6025+600.00 0.0000 20.2100 0.00 44.84 10.00 0.00 0.00 448.40 1,269,482.51
6025+620.00 0.0000 13.8210 0.00 34.03 10.00 0.00 0.00 340.31 1,269,142.20
6025+640.00 0.0000 15.6320 0.00 29.45 10.00 0.00 0.00 294.53 1,268,847.67
6025+660.00 0.0000 13.2670 0.00 28.90 10.00 0.00 0.00 288.99 1,268,558.68
6025+660.00 0.0000 14.9070 0.00 28.17 0.00 0.00 0.00 0.00 1,268,558.68
6025+680.00 0.0000 20.3280 0.00 35.24 10.00 0.00 0.00 352.35 1,268,206.33
6025+700.00 0.0000 33.4080 0.00 53.74 10.00 0.00 0.00 537.36 1,267,668.97
6025+720.00 0.0000 31.0430 0.00 64.45 10.00 0.00 0.00 644.51 1,267,024.46
6025+740.00 0.0000 30.0100 0.00 61.05 10.00 0.00 0.00 610.53 1,266,413.93
6025+760.00 0.0000 24.9910 0.00 55.00 10.00 0.00 0.00 550.01 1,265,863.92
6025+780.00 0.0000 18.6250 0.00 43.62 10.00 0.00 0.00 436.16 1,265,427.76
6025+800.00 0.0000 23.0550 0.00 41.68 10.00 0.00 0.00 416.80 1,265,010.96
6025+820.00 0.0000 22.9700 0.00 46.03 10.00 0.00 0.00 460.25 1,264,550.71
6025+840.00 0.0000 21.0740 0.00 44.04 10.00 0.00 0.00 440.44 1,264,110.27
6025+860.00 0.0000 24.9580 0.00 46.03 10.00 0.00 0.00 460.32 1,263,649.95
6025+880.00 0.0000 26.0910 0.00 51.05 10.00 0.00 0.00 510.49 1,263,139.46
6025+900.00 0.0000 27.3680 0.00 53.46 10.00 0.00 0.00 534.59 1,262,604.87
6025+920.00 0.0000 31.3060 0.00 58.67 10.00 0.00 0.00 586.74 1,262,018.13
6025+940.00 0.0000 29.4610 0.00 60.77 10.00 0.00 0.00 607.67 1,261,410.46
6025+960.00 0.0000 30.4060 0.00 59.87 10.00 0.00 0.00 598.67 1,260,811.79
6025+980.00 0.0000 32.7420 0.00 63.15 10.00 0.00 0.00 631.48 1,260,180.31
6026+000.00 0.0000 32.9530 0.00 65.70 10.00 0.00 0.00 656.95 1,259,523.36
6026+020.00 0.0000 25.0160 0.00 57.97 10.00 0.00 0.00 579.69 1,258,943.67
6026+040.00 0.0000 14.7100 0.00 39.73 10.00 0.00 0.00 397.26 1,258,546.41
6026+060.00 0.0000 18.8360 0.00 33.55 10.00 0.00 0.00 335.46 1,258,210.95
6026+080.00 0.0000 24.7810 0.00 43.62 10.00 0.00 0.00 436.17 1,257,774.78
6026+100.00 0.0000 27.6360 0.00 52.42 10.00 0.00 0.00 524.17 1,257,250.61
6026+120.00 0.0000 22.3240 0.00 49.96 10.00 0.00 0.00 499.60 1,256,751.01
6026+140.00 0.0000 35.2060 0.00 57.53 10.00 0.00 0.00 575.30 1,256,175.71
6026+160.00 0.0000 27.5380 0.00 62.74 10.00 0.00 0.00 627.44 1,255,548.27
6026+180.00 0.0000 24.5500 0.00 52.09 10.00 0.00 0.00 520.88 1,255,027.39
6026+200.00 0.7750 13.5580 0.78 38.11 10.00 7.75 10.08 381.08 1,254,656.39
6026+220.00 0.0000 30.4150 0.78 43.97 10.00 7.75 10.08 439.73 1,254,226.73
6026+240.00 0.0000 39.0640 0.00 69.48 10.00 0.00 0.00 694.79 1,253,531.94
6026+260.00 0.0000 38.8780 0.00 77.94 10.00 0.00 0.00 779.42 1,252,752.52
6026+280.00 0.0000 34.0380 0.00 72.92 10.00 0.00 0.00 729.16 1,252,023.36
267
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6026+290.99 0.0000 34.7310 0.00 68.77 5.49 0.00 0.00 377.82 1,251,645.55
6026+300.00 0.0000 32.9380 0.00 67.67 4.51 0.00 0.00 304.92 1,251,340.63
6026+320.00 0.0000 28.7980 0.00 61.74 10.00 0.00 0.00 617.36 1,250,723.27
6026+320.99 0.0000 28.8040 0.00 57.60 0.49 0.00 0.00 28.46 1,250,694.82
6026+340.00 0.0000 37.0170 0.00 65.82 9.51 0.00 0.00 625.69 1,250,069.12
6026+360.00 0.0000 27.3380 0.00 64.36 10.00 0.00 0.00 643.55 1,249,425.57
6026+380.00 0.4430 15.3960 0.44 42.73 10.00 4.43 5.76 427.34 1,249,003.99
6026+400.00 0.0000 19.3930 0.44 34.79 10.00 4.43 5.76 347.89 1,248,661.86
6026+407.71 0.0000 22.5780 0.00 41.97 3.85 0.00 0.00 161.76 1,248,500.10
6026+420.00 0.0000 24.3140 0.00 46.89 6.15 0.00 0.00 288.20 1,248,211.90
6026+437.71 0.0000 26.7630 0.00 51.08 8.85 0.00 0.00 452.24 1,247,759.67
6026+440.00 0.0000 27.4350 0.00 54.20 1.15 0.00 0.00 62.11 1,247,697.56
6026+460.00 0.0000 32.2960 0.00 59.73 10.00 0.00 0.00 597.31 1,247,100.25
6026+480.00 0.0000 26.3480 0.00 58.64 10.00 0.00 0.00 586.44 1,246,513.81
6026+500.00 0.0000 19.2620 0.00 45.61 10.00 0.00 0.00 456.10 1,246,057.71
6026+520.00 0.0000 33.8890 0.00 53.15 10.00 0.00 0.00 531.51 1,245,526.20
6026+540.00 0.0000 25.0760 0.00 58.97 10.00 0.00 0.00 589.65 1,244,936.55
6026+560.00 0.0000 15.2730 0.00 40.35 10.00 0.00 0.00 403.49 1,244,533.06
6026+580.00 0.0000 29.4000 0.00 44.67 10.00 0.00 0.00 446.73 1,244,086.33
6026+600.00 0.0000 34.3630 0.00 63.76 10.00 0.00 0.00 637.63 1,243,448.70
6026+620.00 0.0000 28.3950 0.00 62.76 10.00 0.00 0.00 627.58 1,242,821.12
6026+640.00 0.0000 30.3600 0.00 58.76 10.00 0.00 0.00 587.55 1,242,233.57
6026+660.00 0.0000 26.7610 0.00 57.12 10.00 0.00 0.00 571.21 1,241,662.36
6026+680.00 0.0000 22.7680 0.00 49.53 10.00 0.00 0.00 495.29 1,241,167.07
6026+700.00 0.0000 32.3800 0.00 55.15 10.00 0.00 0.00 551.48 1,240,615.59
6026+720.00 0.0000 31.4450 0.00 63.83 10.00 0.00 0.00 638.25 1,239,977.34
6026+740.00 0.0000 31.1500 0.00 62.60 10.00 0.00 0.00 625.95 1,239,351.39
6026+760.00 0.0000 31.6540 0.00 62.80 10.00 0.00 0.00 628.04 1,238,723.35
6026+780.00 0.0000 29.1670 0.00 60.82 10.00 0.00 0.00 608.21 1,238,115.14
6026+800.00 0.0000 19.2240 0.00 48.39 10.00 0.00 0.00 483.91 1,237,631.23
6026+820.00 0.0000 13.4450 0.00 32.67 10.00 0.00 0.00 326.69 1,237,304.54
6026+840.00 0.0000 20.7030 0.00 34.15 10.00 0.00 0.00 341.48 1,236,963.06
6026+860.00 0.0000 24.5230 0.00 45.23 10.00 0.00 0.00 452.26 1,236,510.80
6026+880.00 0.0000 31.0860 0.00 55.61 10.00 0.00 0.00 556.09 1,235,954.71
6026+900.00 0.0000 24.1840 0.00 55.27 10.00 0.00 0.00 552.70 1,235,402.01
6026+920.00 0.0000 23.1060 0.00 47.29 10.00 0.00 0.00 472.90 1,234,929.11
6026+940.00 0.0000 25.9210 0.00 49.03 10.00 0.00 0.00 490.27 1,234,438.84
6026+960.00 0.0000 34.0610 0.00 59.98 10.00 0.00 0.00 599.82 1,233,839.02
6026+980.00 0.0000 32.5820 0.00 66.64 10.00 0.00 0.00 666.43 1,233,172.59
6027+000.00 0.0000 24.6670 0.00 57.25 10.00 0.00 0.00 572.49 1,232,600.10
6027+020.00 0.0000 28.7630 0.00 53.43 10.00 0.00 0.00 534.30 1,232,065.80
6027+040.00 0.0000 26.9420 0.00 55.71 10.00 0.00 0.00 557.05 1,231,508.75
6027+060.00 0.0000 35.2320 0.00 62.17 10.00 0.00 0.00 621.74 1,230,887.01
6027+080.00 0.0000 27.1550 0.00 62.39 10.00 0.00 0.00 623.87 1,230,263.14
6027+100.00 0.0000 24.9420 0.00 52.10 10.00 0.00 0.00 520.97 1,229,742.17
268
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6027+120.00 0.0000 21.8040 0.00 46.75 10.00 0.00 0.00 467.46 1,229,274.71
6027+140.00 0.0000 14.9730 0.00 36.78 10.00 0.00 0.00 367.77 1,228,906.94
6027+160.00 0.0000 12.3260 0.00 27.30 10.00 0.00 0.00 272.99 1,228,633.95
6027+180.00 0.8610 9.9270 0.86 22.25 10.00 8.61 11.19 222.53 1,228,422.61
6027+200.00 0.0000 19.8220 0.86 29.75 10.00 8.61 11.19 297.49 1,228,136.31
6027+220.00 0.0000 21.3350 0.00 41.16 10.00 0.00 0.00 411.57 1,227,724.74
6027+240.00 0.0000 25.6250 0.00 46.96 10.00 0.00 0.00 469.60 1,227,255.14
6027+260.00 0.0000 16.7060 0.00 42.33 10.00 0.00 0.00 423.31 1,226,831.83
6027+280.00 0.0000 19.6450 0.00 36.35 10.00 0.00 0.00 363.51 1,226,468.32
6027+300.00 0.0000 15.8960 0.00 35.54 10.00 0.00 0.00 355.41 1,226,112.91
6027+320.00 0.0000 17.8370 0.00 33.73 10.00 0.00 0.00 337.33 1,225,775.58
6027+340.00 0.0000 20.1730 0.00 38.01 10.00 0.00 0.00 380.10 1,225,395.48
6027+360.00 2.5230 9.7130 2.52 29.89 10.00 25.23 32.80 298.86 1,225,129.42
6027+380.00 4.6760 4.5610 7.20 14.27 10.00 71.99 93.59 142.74 1,225,080.27
6027+400.00 0.0000 16.6480 4.68 21.21 10.00 46.76 60.79 212.09 1,224,928.97
6027+420.00 0.0000 25.0520 0.00 41.70 10.00 0.00 0.00 417.00 1,224,511.97
6027+440.00 0.0000 27.0240 0.00 52.08 10.00 0.00 0.00 520.76 1,223,991.21
6027+460.00 0.0000 29.0230 0.00 56.05 10.00 0.00 0.00 560.47 1,223,430.74
6027+480.00 0.0000 36.2890 0.00 65.31 10.00 0.00 0.00 653.12 1,222,777.62
6027+500.00 0.0000 33.9780 0.00 70.27 10.00 0.00 0.00 702.67 1,222,074.95
6027+520.00 0.0000 29.4660 0.00 63.44 10.00 0.00 0.00 634.44 1,221,440.51
6027+540.00 0.0000 19.5900 0.00 49.06 10.00 0.00 0.00 490.56 1,220,949.95
6027+560.00 0.0000 26.0760 0.00 45.67 10.00 0.00 0.00 456.66 1,220,493.29
6027+565.00 0.0000 29.4520 0.00 55.53 2.50 0.00 0.00 138.82 1,220,354.47
6027+565.00 0.0000 29.4520 0.00 58.90 0.00 0.00 0.00 0.00 1,220,354.47
6027+580.00 0.0000 34.3000 0.00 63.75 7.50 0.00 0.00 478.14 1,219,876.33
6027+600.00 0.0000 24.2410 0.00 58.54 10.00 0.00 0.00 585.41 1,219,290.92
6027+620.00 0.0000 25.9000 0.00 50.14 10.00 0.00 0.00 501.41 1,218,789.51
6027+640.00 0.0000 32.2200 0.00 58.12 10.00 0.00 0.00 581.20 1,218,208.31
6027+660.00 0.0000 21.4000 0.00 53.62 10.00 0.00 0.00 536.20 1,217,672.11
6027+680.00 0.0000 30.7310 0.00 52.13 10.00 0.00 0.00 521.31 1,217,150.80
6027+700.00 0.0000 34.1170 0.00 64.85 10.00 0.00 0.00 648.48 1,216,502.32
6027+720.00 0.0000 34.1850 0.00 68.30 10.00 0.00 0.00 683.02 1,215,819.30
6027+740.00 0.0000 37.4990 0.00 71.68 10.00 0.00 0.00 716.84 1,215,102.46
6027+760.00 0.0000 32.2280 0.00 69.73 10.00 0.00 0.00 697.27 1,214,405.19
6027+780.00 0.0000 33.5960 0.00 65.82 10.00 0.00 0.00 658.24 1,213,746.95
6027+800.00 0.0000 22.7810 0.00 56.38 10.00 0.00 0.00 563.77 1,213,183.18
6027+820.00 0.0000 22.5520 0.00 45.33 10.00 0.00 0.00 453.33 1,212,729.85
6027+840.00 0.0000 23.3070 0.00 45.86 10.00 0.00 0.00 458.59 1,212,271.26
6027+860.00 0.0000 24.5740 0.00 47.88 10.00 0.00 0.00 478.81 1,211,792.45
6027+880.00 0.0000 24.9030 0.00 49.48 10.00 0.00 0.00 494.77 1,211,297.68
6027+900.00 0.0000 19.1890 0.00 44.09 10.00 0.00 0.00 440.92 1,210,856.76
6027+920.00 0.0000 15.2590 0.00 34.45 10.00 0.00 0.00 344.48 1,210,512.28
6027+940.00 0.0000 14.9190 0.00 30.18 10.00 0.00 0.00 301.78 1,210,210.50
6027+960.00 0.0000 18.9210 0.00 33.84 10.00 0.00 0.00 338.40 1,209,872.10
269
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6027+980.00 0.0000 22.3200 0.00 41.24 10.00 0.00 0.00 412.41 1,209,459.69
6027+990.00 0.0000 23.0800 0.00 45.40 5.00 0.00 0.00 227.00 1,209,232.69
6027+990.00 0.0000 23.8400 0.00 46.92 0.00 0.00 0.00 0.00 1,209,232.69
6028+000.00 0.0000 23.3260 0.00 47.17 5.00 0.00 0.00 235.83 1,208,996.86
6028+000.00 0.0000 23.3260 0.00 46.65 0.00 0.00 0.00 0.00 1,208,996.86
6028+020.00 0.0000 20.8380 0.00 44.16 10.00 0.00 0.00 441.64 1,208,555.22
6028+040.00 1.4840 11.1680 1.48 32.01 10.00 14.84 19.29 320.06 1,208,254.45
6028+060.00 0.0000 19.4650 1.48 30.63 10.00 14.84 19.29 306.33 1,207,967.41
6028+080.00 0.0000 21.6240 0.00 41.09 10.00 0.00 0.00 410.89 1,207,556.52
6028+100.00 0.0000 18.1460 0.00 39.77 10.00 0.00 0.00 397.70 1,207,158.82
6028+120.00 0.0000 19.1770 0.00 37.32 10.00 0.00 0.00 373.23 1,206,785.59
6028+140.00 0.0000 21.5640 0.00 40.74 10.00 0.00 0.00 407.41 1,206,378.18
6028+140.00 0.0000 21.5640 0.00 43.13 0.00 0.00 0.00 0.00 1,206,378.18
6028+160.00 0.0000 25.1440 0.00 46.71 10.00 0.00 0.00 467.08 1,205,911.10
6028+180.00 0.0000 25.7490 0.00 50.89 10.00 0.00 0.00 508.93 1,205,402.17
6028+200.00 0.0000 31.6450 0.00 57.39 10.00 0.00 0.00 573.94 1,204,828.23
6028+220.00 0.0000 30.1010 0.00 61.75 10.00 0.00 0.00 617.46 1,204,210.77
6028+240.00 0.0000 31.3580 0.00 61.46 10.00 0.00 0.00 614.59 1,203,596.18
6028+260.00 0.0000 28.5630 0.00 59.92 10.00 0.00 0.00 599.21 1,202,996.97
6028+280.00 0.0000 27.6620 0.00 56.23 10.00 0.00 0.00 562.25 1,202,434.72
6028+300.00 0.0000 31.4830 0.00 59.15 10.00 0.00 0.00 591.45 1,201,843.27
6028+320.00 0.0000 27.2530 0.00 58.74 10.00 0.00 0.00 587.36 1,201,255.91
6028+340.00 0.0000 23.7530 0.00 51.01 10.00 0.00 0.00 510.06 1,200,745.85
6028+360.00 0.0000 26.3710 0.00 50.12 10.00 0.00 0.00 501.24 1,200,244.61
6028+380.00 0.0000 28.3840 0.00 54.76 10.00 0.00 0.00 547.55 1,199,697.06
6028+400.00 0.0000 25.1630 0.00 53.55 10.00 0.00 0.00 535.47 1,199,161.59
6028+420.00 0.0000 25.7060 0.00 50.87 10.00 0.00 0.00 508.69 1,198,652.90
6028+440.00 0.0000 25.2820 0.00 50.99 10.00 0.00 0.00 509.88 1,198,143.02
6028+460.00 0.0000 29.3640 0.00 54.65 10.00 0.00 0.00 546.46 1,197,596.56
6028+480.00 0.0000 31.4000 0.00 60.76 10.00 0.00 0.00 607.64 1,196,988.92
6028+500.00 0.0000 29.7910 0.00 61.19 10.00 0.00 0.00 611.91 1,196,377.01
6028+520.00 0.0000 33.7000 0.00 63.49 10.00 0.00 0.00 634.91 1,195,742.10
6028+540.00 0.0000 28.0440 0.00 61.74 10.00 0.00 0.00 617.44 1,195,124.66
6028+560.00 0.0000 25.5560 0.00 53.60 10.00 0.00 0.00 536.00 1,194,588.66
6028+580.00 0.0000 30.4030 0.00 55.96 10.00 0.00 0.00 559.59 1,194,029.07
6028+600.00 0.0000 33.8000 0.00 64.20 10.00 0.00 0.00 642.03 1,193,387.04
6028+620.00 0.0000 35.1830 0.00 68.98 10.00 0.00 0.00 689.83 1,192,697.21
6028+640.00 0.0000 37.4430 0.00 72.63 10.00 0.00 0.00 726.26 1,191,970.95
6028+660.00 0.0000 33.7600 0.00 71.20 10.00 0.00 0.00 712.03 1,191,258.92
6028+680.00 0.0000 35.5720 0.00 69.33 10.00 0.00 0.00 693.32 1,190,565.60
6028+700.00 0.0000 39.6960 0.00 75.27 10.00 0.00 0.00 752.68 1,189,812.92
6028+720.00 0.0000 40.4130 0.00 80.11 10.00 0.00 0.00 801.09 1,189,011.83
6028+740.00 0.0000 40.2180 0.00 80.63 10.00 0.00 0.00 806.31 1,188,205.52
6028+760.00 0.0000 39.0730 0.00 79.29 10.00 0.00 0.00 792.91 1,187,412.61
6028+780.00 0.0000 36.9570 0.00 76.03 10.00 0.00 0.00 760.30 1,186,652.31
270
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6028+800.00 0.0000 39.1220 0.00 76.08 10.00 0.00 0.00 760.79 1,185,891.52
6028+820.00 0.0000 40.3590 0.00 79.48 10.00 0.00 0.00 794.81 1,185,096.71
6028+840.00 0.0000 39.1100 0.00 79.47 10.00 0.00 0.00 794.69 1,184,302.02
6028+860.00 0.0000 34.5360 0.00 73.65 10.00 0.00 0.00 736.46 1,183,565.56
6028+880.00 0.0000 32.0570 0.00 66.59 10.00 0.00 0.00 665.93 1,182,899.63
6028+900.00 0.0000 36.8430 0.00 68.90 10.00 0.00 0.00 689.00 1,182,210.63
6028+920.00 0.0000 37.1880 0.00 74.03 10.00 0.00 0.00 740.31 1,181,470.32
6028+940.00 0.0000 29.4780 0.00 66.67 10.00 0.00 0.00 666.66 1,180,803.66
6028+960.00 0.0000 21.7770 0.00 51.26 10.00 0.00 0.00 512.55 1,180,291.11
6028+980.00 0.0000 23.6380 0.00 45.42 10.00 0.00 0.00 454.15 1,179,836.96
6029+000.00 0.0000 24.4090 0.00 48.05 10.00 0.00 0.00 480.47 1,179,356.49
6029+020.00 0.0000 24.8480 0.00 49.26 10.00 0.00 0.00 492.57 1,178,863.92
6029+040.00 0.0000 23.7070 0.00 48.56 10.00 0.00 0.00 485.55 1,178,378.37
6029+060.00 0.0000 23.9490 0.00 47.66 10.00 0.00 0.00 476.56 1,177,901.81
6029+080.00 0.0000 29.7590 0.00 53.71 10.00 0.00 0.00 537.08 1,177,364.73
6029+100.00 0.0000 31.0270 0.00 60.79 10.00 0.00 0.00 607.86 1,176,756.87
6029+120.00 0.0000 30.9890 0.00 62.02 10.00 0.00 0.00 620.16 1,176,136.71
6029+140.00 0.0000 29.5070 0.00 60.50 10.00 0.00 0.00 604.96 1,175,531.75
6029+160.00 0.0000 23.0850 0.00 52.59 10.00 0.00 0.00 525.92 1,175,005.83
6029+180.00 0.0000 23.1430 0.00 46.23 10.00 0.00 0.00 462.28 1,174,543.55
6029+200.00 0.0000 28.5950 0.00 51.74 10.00 0.00 0.00 517.38 1,174,026.17
6029+220.00 0.0000 27.1910 0.00 55.79 10.00 0.00 0.00 557.86 1,173,468.31
6029+240.00 0.0000 23.5340 0.00 50.73 10.00 0.00 0.00 507.25 1,172,961.06
6029+255.00 0.0000 17.3570 0.00 40.89 7.50 0.00 0.00 306.68 1,172,654.38
6029+255.00 0.0000 14.3180 0.00 31.68 0.00 0.00 0.00 0.00 1,172,654.38
6029+260.00 0.0000 14.8510 0.00 29.17 2.50 0.00 0.00 72.92 1,172,581.46
6029+280.00 0.0000 16.8520 0.00 31.70 10.00 0.00 0.00 317.03 1,172,264.43
6029+300.00 0.0000 25.7790 0.00 42.63 10.00 0.00 0.00 426.31 1,171,838.12
6029+320.00 0.0000 28.2630 0.00 54.04 10.00 0.00 0.00 540.42 1,171,297.70
6029+340.00 0.0000 30.8520 0.00 59.12 10.00 0.00 0.00 591.15 1,170,706.55
6029+340.00 0.0000 38.0460 0.00 68.90 0.00 0.00 0.00 0.00 1,170,706.55
6029+360.00 0.0000 35.8340 0.00 73.88 10.00 0.00 0.00 738.80 1,169,967.75
6029+380.00 0.0000 28.0490 0.00 63.88 10.00 0.00 0.00 638.83 1,169,328.92
6029+400.00 0.0000 27.9010 0.00 55.95 10.00 0.00 0.00 559.50 1,168,769.42
6029+420.00 0.0000 37.4680 0.00 65.37 10.00 0.00 0.00 653.69 1,168,115.73
6029+440.00 0.0000 36.0630 0.00 73.53 10.00 0.00 0.00 735.31 1,167,380.42
6029+449.97 0.0000 33.0710 0.00 69.13 4.98 0.00 0.00 344.46 1,167,035.96
6029+460.00 0.0000 29.8420 0.00 62.91 5.02 0.00 0.00 315.67 1,166,720.29
6029+480.00 0.0000 23.2730 0.00 53.12 10.00 0.00 0.00 531.15 1,166,189.14
6029+500.00 0.0000 32.6230 0.00 55.90 10.00 0.00 0.00 558.96 1,165,630.18
6029+520.00 0.0000 36.7840 0.00 69.41 10.00 0.00 0.00 694.07 1,164,936.11
6029+540.00 0.0000 43.3890 0.00 80.17 10.00 0.00 0.00 801.73 1,164,134.38
6029+560.00 0.0000 49.5710 0.00 92.96 10.00 0.00 0.00 929.60 1,163,204.78
6029+580.00 0.0000 37.4790 0.00 87.05 10.00 0.00 0.00 870.50 1,162,334.28
6029+599.97 0.0000 40.7110 0.00 78.19 9.98 0.00 0.00 780.53 1,161,553.75
271
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6029+600.00 0.0000 40.7130 0.00 81.42 0.02 0.00 0.00 1.42 1,161,552.32
6029+620.00 0.0000 33.9750 0.00 74.69 10.00 0.00 0.00 746.88 1,160,805.44
6029+620.00 0.0000 39.9260 0.00 73.90 0.00 0.00 0.00 0.00 1,160,805.44
6029+640.00 0.0000 29.4560 0.00 69.38 10.00 0.00 0.00 693.82 1,160,111.62
6029+660.00 0.0000 38.6280 0.00 68.08 10.00 0.00 0.00 680.84 1,159,430.78
6029+680.00 0.0000 39.8340 0.00 78.46 10.00 0.00 0.00 784.62 1,158,646.16
6029+700.00 0.0000 37.9490 0.00 77.78 10.00 0.00 0.00 777.83 1,157,868.33
6029+720.00 0.0000 29.6400 0.00 67.59 10.00 0.00 0.00 675.89 1,157,192.44
6029+740.00 0.0000 35.8800 0.00 65.52 10.00 0.00 0.00 655.20 1,156,537.24
6029+760.00 0.0000 46.8700 0.00 82.75 10.00 0.00 0.00 827.50 1,155,709.74
6029+780.00 0.0000 41.2350 0.00 88.11 10.00 0.00 0.00 881.05 1,154,828.69
6029+800.00 0.0000 50.9280 0.00 92.16 10.00 0.00 0.00 921.63 1,153,907.06
6029+820.00 0.0000 52.7510 0.00 103.68 10.00 0.00 0.00 1,036.79 1,152,870.27
6029+840.00 0.0000 44.7120 0.00 97.46 10.00 0.00 0.00 974.63 1,151,895.64
6029+860.00 0.0000 43.5190 0.00 88.23 10.00 0.00 0.00 882.31 1,151,013.33
6029+880.00 0.0000 37.9330 0.00 81.45 10.00 0.00 0.00 814.52 1,150,198.81
6029+900.00 0.0000 47.3090 0.00 85.24 10.00 0.00 0.00 852.42 1,149,346.39
6029+920.00 0.0000 47.6250 0.00 94.93 10.00 0.00 0.00 949.34 1,148,397.05
6029+940.00 0.0000 46.6630 0.00 94.29 10.00 0.00 0.00 942.88 1,147,454.17
6029+960.00 0.0000 43.6220 0.00 90.29 10.00 0.00 0.00 902.85 1,146,551.32
6029+980.00 0.0000 32.2430 0.00 75.87 10.00 0.00 0.00 758.65 1,145,792.67
6030+000.00 0.0000 21.7420 0.00 53.99 10.00 0.00 0.00 539.85 1,145,252.82
TABLA 28 CÁLCULO DE CURVA MASA DEL TRAMO DEL 6036+800– 6067+000
272
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6037+060.00 0.0000 41.1700 0.00 78.03 10.00 0.00 0.00 780.26 1,289,460.89
6037+080.00 0.0000 39.5640 0.00 80.73 10.00 0.00 0.00 807.34 1,288,653.55
6037+100.00 0.0000 38.8360 0.00 78.40 10.00 0.00 0.00 784.00 1,287,869.55
6037+120.00 0.0000 27.0550 0.00 65.89 10.00 0.00 0.00 658.91 1,287,210.64
6037+140.00 0.0000 15.8240 0.00 42.88 10.00 0.00 0.00 428.79 1,286,781.85
6037+142.12 0.0000 17.5320 0.00 33.36 1.06 0.00 0.00 35.32 1,286,746.53
6037+160.00 0.0000 32.5560 0.00 50.09 8.94 0.00 0.00 447.84 1,286,298.69
6037+180.00 0.0000 38.2400 0.00 70.80 10.00 0.00 0.00 707.96 1,285,590.73
6037+200.00 0.0000 26.8390 0.00 65.08 10.00 0.00 0.00 650.79 1,284,939.94
6037+220.00 0.0000 20.0160 0.00 46.86 10.00 0.00 0.00 468.55 1,284,471.39
6037+240.00 0.0000 11.4080 0.00 31.42 10.00 0.00 0.00 314.24 1,284,157.15
6037+260.00 0.0000 11.2410 0.00 22.65 10.00 0.00 0.00 226.49 1,283,930.66
6037+280.00 0.0000 22.3960 0.00 33.64 10.00 0.00 0.00 336.37 1,283,594.29
6037+300.00 0.0000 26.8800 0.00 49.28 10.00 0.00 0.00 492.76 1,283,101.53
6037+316.55 0.0000 20.7820 0.00 47.66 8.28 0.00 0.00 394.50 1,282,707.03
6037+320.00 0.0000 18.5950 0.00 39.38 1.72 0.00 0.00 67.85 1,282,639.19
6037+340.00 1.2290 2.8820 1.23 21.48 10.00 12.29 15.98 214.77 1,282,440.40
6037+360.00 0.0000 19.8330 1.23 22.72 10.00 12.29 15.98 227.15 1,282,229.22
6037+380.00 0.0000 33.5430 0.00 53.38 10.00 0.00 0.00 533.76 1,281,695.46
6037+400.00 0.0000 28.5390 0.00 62.08 10.00 0.00 0.00 620.82 1,281,074.64
6037+420.00 0.0000 17.9960 0.00 46.54 10.00 0.00 0.00 465.35 1,280,609.29
6037+440.00 0.0000 25.4060 0.00 43.40 10.00 0.00 0.00 434.02 1,280,175.27
6037+460.00 0.0000 29.0280 0.00 54.43 10.00 0.00 0.00 544.34 1,279,630.93
6037+466.55 0.0000 26.3830 0.00 55.41 3.28 0.00 0.00 181.55 1,279,449.38
6037+480.00 0.0000 21.3590 0.00 47.74 6.72 0.00 0.00 320.99 1,279,128.38
6037+500.00 0.0000 22.4810 0.00 43.84 10.00 0.00 0.00 438.40 1,278,689.98
6037+520.00 4.6710 0.1950 4.67 22.68 10.00 46.71 60.72 226.76 1,278,523.95
6037+540.00 0.0000 15.9350 4.67 16.13 10.00 46.71 60.72 161.30 1,278,423.37
6037+560.00 0.0000 20.7540 0.00 36.69 10.00 0.00 0.00 366.89 1,278,056.48
6037+580.00 0.0000 27.1270 0.00 47.88 10.00 0.00 0.00 478.81 1,277,577.67
6037+600.00 0.0000 30.7070 0.00 57.83 10.00 0.00 0.00 578.34 1,276,999.33
6037+620.00 0.0000 34.8150 0.00 65.52 10.00 0.00 0.00 655.22 1,276,344.11
6037+640.00 0.0000 33.5060 0.00 68.32 10.00 0.00 0.00 683.21 1,275,660.90
6037+660.00 0.0000 23.5280 0.00 57.03 10.00 0.00 0.00 570.34 1,275,090.56
6037+680.00 0.0000 32.8530 0.00 56.38 10.00 0.00 0.00 563.81 1,274,526.75
6037+700.00 0.0000 19.5110 0.00 52.36 10.00 0.00 0.00 523.64 1,274,003.11
6037+720.00 1.4190 3.8680 1.42 23.38 10.00 14.19 18.45 233.79 1,273,787.77
6037+740.00 0.0000 12.2710 1.42 16.14 10.00 14.19 18.45 161.39 1,273,644.82
6037+760.00 0.0000 14.8670 0.00 27.14 10.00 0.00 0.00 271.38 1,273,373.44
6037+780.00 0.7160 4.1190 0.72 18.99 10.00 7.16 9.31 189.86 1,273,192.89
6037+800.00 0.0000 14.7170 0.72 18.84 10.00 7.16 9.31 188.36 1,273,013.84
6037+820.00 0.0000 10.0550 0.00 24.77 10.00 0.00 0.00 247.72 1,272,766.12
6037+840.00 0.0000 22.8570 0.00 32.91 10.00 0.00 0.00 329.12 1,272,437.00
6037+860.00 0.0000 19.2580 0.00 42.12 10.00 0.00 0.00 421.15 1,272,015.85
6037+880.00 0.0000 20.0630 0.00 39.32 10.00 0.00 0.00 393.21 1,271,622.64
273
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6037+900.00 0.3220 11.4930 0.32 31.56 10.00 3.22 4.19 315.56 1,271,311.27
6037+920.00 0.7470 9.7650 1.07 21.26 10.00 10.69 13.90 212.58 1,271,112.58
6037+940.00 0.0000 9.5860 0.75 19.35 10.00 7.47 9.71 193.51 1,270,928.78
6037+960.00 0.0000 16.6700 0.00 26.26 10.00 0.00 0.00 262.56 1,270,666.22
6037+980.00 0.0000 18.9660 0.00 35.64 10.00 0.00 0.00 356.36 1,270,309.86
6038+000.00 0.0000 17.7860 0.00 36.75 10.00 0.00 0.00 367.52 1,269,942.34
6038+020.00 0.0000 19.3830 0.00 37.17 10.00 0.00 0.00 371.69 1,269,570.65
6038+040.00 0.0000 24.4300 0.00 43.81 10.00 0.00 0.00 438.13 1,269,132.52
6038+060.00 0.0000 25.8360 0.00 50.27 10.00 0.00 0.00 502.66 1,268,629.86
6038+080.00 0.0000 21.6800 0.00 47.52 10.00 0.00 0.00 475.16 1,268,154.70
6038+100.00 0.0000 20.2650 0.00 41.95 10.00 0.00 0.00 419.45 1,267,735.25
6038+120.00 0.6600 6.8890 0.66 27.15 10.00 6.60 8.58 271.54 1,267,472.29
6038+140.00 0.4720 11.0630 1.13 17.95 10.00 11.32 14.72 179.52 1,267,307.49
6038+160.00 0.0000 15.2170 0.47 26.28 10.00 4.72 6.14 262.80 1,267,050.83
6038+180.00 0.0000 15.2370 0.00 30.45 10.00 0.00 0.00 304.54 1,266,746.29
6038+200.00 2.3180 0.8530 2.32 16.09 10.00 23.18 30.13 160.90 1,266,615.52
6038+220.00 13.6560 0.2370 15.97 1.09 10.00 159.74 207.66 10.90 1,266,812.28
6038+240.00 4.0860 0.8540 17.74 1.09 10.00 177.42 230.65 10.91 1,267,032.02
6038+260.00 0.0000 15.5030 4.09 16.36 10.00 40.86 53.12 163.57 1,266,921.57
6038+280.00 0.0000 19.0450 0.00 34.55 10.00 0.00 0.00 345.48 1,266,576.09
6038+300.00 0.0000 19.9110 0.00 38.96 10.00 0.00 0.00 389.56 1,266,186.53
6038+320.00 0.0000 20.2210 0.00 40.13 10.00 0.00 0.00 401.32 1,265,785.21
6038+340.00 0.0000 16.7020 0.00 36.92 10.00 0.00 0.00 369.23 1,265,415.98
6038+360.00 0.0000 19.0320 0.00 35.73 10.00 0.00 0.00 357.34 1,265,058.64
6038+380.00 0.0000 9.3070 0.00 28.34 10.00 0.00 0.00 283.39 1,264,775.25
6038+400.00 2.0040 1.8680 2.00 11.18 10.00 20.04 26.05 111.75 1,264,689.55
6038+420.00 0.0000 13.7420 2.00 15.61 10.00 20.04 26.05 156.10 1,264,559.50
6038+440.00 1.0780 3.0490 1.08 16.79 10.00 10.78 14.01 167.91 1,264,405.60
6038+460.00 0.0000 17.2850 1.08 20.33 10.00 10.78 14.01 203.34 1,264,216.28
6038+480.00 0.0000 18.3580 0.00 35.64 10.00 0.00 0.00 356.43 1,263,859.85
6038+500.00 0.0000 19.1130 0.00 37.47 10.00 0.00 0.00 374.71 1,263,485.14
6038+520.00 0.0000 15.5210 0.00 34.63 10.00 0.00 0.00 346.34 1,263,138.80
6038+540.00 0.0000 18.7440 0.00 34.27 10.00 0.00 0.00 342.65 1,262,796.15
6038+560.00 0.0000 12.8510 0.00 31.60 10.00 0.00 0.00 315.95 1,262,480.20
6038+580.00 0.4520 10.7530 0.45 23.60 10.00 4.52 5.88 236.04 1,262,250.03
6038+600.00 0.0000 14.4960 0.45 25.25 10.00 4.52 5.88 252.49 1,262,003.42
6038+620.00 0.0000 21.3620 0.00 35.86 10.00 0.00 0.00 358.58 1,261,644.84
6038+640.00 0.0000 23.9260 0.00 45.29 10.00 0.00 0.00 452.88 1,261,191.96
6038+660.00 0.0000 20.6650 0.00 44.59 10.00 0.00 0.00 445.91 1,260,746.05
6038+680.00 0.0000 16.8030 0.00 37.47 10.00 0.00 0.00 374.68 1,260,371.37
6038+700.00 0.0000 20.0320 0.00 36.84 10.00 0.00 0.00 368.35 1,260,003.02
6038+720.00 0.0000 29.9170 0.00 49.95 10.00 0.00 0.00 499.49 1,259,503.53
6038+740.00 0.0000 31.8530 0.00 61.77 10.00 0.00 0.00 617.70 1,258,885.83
6038+760.00 0.0000 25.6040 0.00 57.46 10.00 0.00 0.00 574.57 1,258,311.26
6038+780.00 0.0000 21.9310 0.00 47.54 10.00 0.00 0.00 475.35 1,257,835.91
274
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6038+800.00 0.0000 12.6020 0.00 34.53 10.00 0.00 0.00 345.33 1,257,490.58
6038+820.00 0.0000 23.2930 0.00 35.90 10.00 0.00 0.00 358.95 1,257,131.63
6038+840.00 0.8760 16.5460 0.88 39.84 10.00 8.76 11.39 398.39 1,256,744.63
6038+860.00 1.3970 9.1470 2.27 25.69 10.00 22.73 29.55 256.93 1,256,517.25
6038+880.00 0.6470 3.1190 2.04 12.27 10.00 20.44 26.57 122.66 1,256,421.16
6038+900.00 0.0000 22.2950 0.65 25.41 10.00 6.47 8.41 254.14 1,256,175.43
6038+920.00 0.0000 32.4630 0.00 54.76 10.00 0.00 0.00 547.58 1,255,627.85
6038+940.00 0.0000 32.7540 0.00 65.22 10.00 0.00 0.00 652.17 1,254,975.68
6038+960.00 0.0000 32.9160 0.00 65.67 10.00 0.00 0.00 656.70 1,254,318.98
6038+980.00 0.0000 30.2330 0.00 63.15 10.00 0.00 0.00 631.49 1,253,687.49
6039+000.00 0.0000 40.5440 0.00 70.78 10.00 0.00 0.00 707.77 1,252,979.72
6039+020.00 0.0000 33.5350 0.00 74.08 10.00 0.00 0.00 740.79 1,252,238.93
6039+040.00 0.0000 30.7880 0.00 64.32 10.00 0.00 0.00 643.23 1,251,595.70
6039+060.00 0.0000 28.9280 0.00 59.72 10.00 0.00 0.00 597.16 1,250,998.54
6039+080.00 0.0000 26.0520 0.00 54.98 10.00 0.00 0.00 549.80 1,250,448.74
6039+100.00 0.0000 23.9560 0.00 50.01 10.00 0.00 0.00 500.08 1,249,948.66
6039+120.00 0.0000 22.4020 0.00 46.36 10.00 0.00 0.00 463.58 1,249,485.08
6039+140.00 0.0000 21.1810 0.00 43.58 10.00 0.00 0.00 435.83 1,249,049.25
6039+160.00 0.0000 16.3220 0.00 37.50 10.00 0.00 0.00 375.03 1,248,674.22
6039+180.00 0.0000 10.9510 0.00 27.27 10.00 0.00 0.00 272.73 1,248,401.49
6039+200.00 0.0000 27.9030 0.00 38.85 10.00 0.00 0.00 388.54 1,248,012.95
6039+220.00 0.0000 35.4150 0.00 63.32 10.00 0.00 0.00 633.18 1,247,379.77
6039+240.00 0.0000 26.7060 0.00 62.12 10.00 0.00 0.00 621.21 1,246,758.56
6039+260.00 0.0000 20.0020 0.00 46.71 10.00 0.00 0.00 467.08 1,246,291.48
6039+280.00 0.0000 21.4340 0.00 41.44 10.00 0.00 0.00 414.36 1,245,877.12
6039+300.00 0.0000 21.1400 0.00 42.57 10.00 0.00 0.00 425.74 1,245,451.38
6039+320.00 0.0000 40.6180 0.00 61.76 10.00 0.00 0.00 617.58 1,244,833.80
6039+340.00 0.0000 40.9870 0.00 81.61 10.00 0.00 0.00 816.05 1,244,017.75
6039+360.00 0.0000 23.8960 0.00 64.88 10.00 0.00 0.00 648.83 1,243,368.92
6039+380.00 0.0000 16.7480 0.00 40.64 10.00 0.00 0.00 406.44 1,242,962.48
6039+400.00 0.0000 14.5380 0.00 31.29 10.00 0.00 0.00 312.86 1,242,649.62
6039+420.00 1.8530 9.5530 1.85 24.09 10.00 18.53 24.09 240.91 1,242,432.80
6039+440.00 0.0000 14.0170 1.85 23.57 10.00 18.53 24.09 235.70 1,242,221.19
6039+460.00 0.0000 24.6800 0.00 38.70 10.00 0.00 0.00 386.97 1,241,834.22
6039+480.00 0.0000 21.0150 0.00 45.70 10.00 0.00 0.00 456.95 1,241,377.27
6039+500.00 0.0000 25.6680 0.00 46.68 10.00 0.00 0.00 466.83 1,240,910.44
6039+520.00 0.0000 17.9440 0.00 43.61 10.00 0.00 0.00 436.12 1,240,474.32
6039+540.00 0.0000 17.3070 0.00 35.25 10.00 0.00 0.00 352.51 1,240,121.81
6039+560.00 0.0000 17.4100 0.00 34.72 10.00 0.00 0.00 347.17 1,239,774.64
6039+580.00 0.0000 20.0060 0.00 37.42 10.00 0.00 0.00 374.16 1,239,400.48
6039+600.00 0.0000 15.2060 0.00 35.21 10.00 0.00 0.00 352.12 1,239,048.36
6039+620.00 0.4500 9.3070 0.45 24.51 10.00 4.50 5.85 245.13 1,238,809.08
6039+640.00 10.0160 0.2080 10.47 9.52 10.00 104.66 136.06 95.15 1,238,849.99
6039+660.00 1.3590 1.8870 11.38 2.10 10.00 113.75 147.88 20.95 1,238,976.91
6039+680.00 0.0000 14.0760 1.36 15.96 10.00 13.59 17.67 159.63 1,238,834.95
275
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6039+700.00 0.0000 22.1910 0.00 36.27 10.00 0.00 0.00 362.67 1,238,472.28
6039+720.00 0.0000 35.3500 0.00 57.54 10.00 0.00 0.00 575.41 1,237,896.87
6039+722.65 0.0000 34.8590 0.00 70.21 1.33 0.00 0.00 93.17 1,237,803.70
6039+730.00 0.0000 32.6580 0.00 67.52 3.67 0.00 0.00 247.99 1,237,555.71
6039+740.00 0.0000 30.7430 0.00 63.40 5.00 0.00 0.00 317.01 1,237,238.71
6039+742.65 0.0000 31.5690 0.00 62.31 1.33 0.00 0.00 82.69 1,237,156.02
6039+750.00 0.0000 33.0630 0.00 64.63 3.67 0.00 0.00 237.39 1,236,918.63
6039+760.00 0.0000 33.7100 0.00 66.77 5.00 0.00 0.00 333.87 1,236,584.76
6039+770.00 0.0000 21.9530 0.00 55.66 5.00 0.00 0.00 278.32 1,236,306.45
6039+780.00 0.0000 16.5620 0.00 38.52 5.00 0.00 0.00 192.58 1,236,113.87
6039+790.00 0.0000 26.2280 0.00 42.79 5.00 0.00 0.00 213.95 1,235,899.92
6039+800.00 0.0000 35.6470 0.00 61.88 5.00 0.00 0.00 309.38 1,235,590.55
6039+810.00 0.0000 36.7690 0.00 72.42 5.00 0.00 0.00 362.08 1,235,228.47
6039+820.00 0.0000 35.1050 0.00 71.87 5.00 0.00 0.00 359.37 1,234,869.10
6039+830.00 0.0000 29.7370 0.00 64.84 5.00 0.00 0.00 324.21 1,234,544.89
6039+840.00 0.0000 25.9180 0.00 55.66 5.00 0.00 0.00 278.28 1,234,266.61
6039+850.00 0.0000 27.3680 0.00 53.29 5.00 0.00 0.00 266.43 1,234,000.18
6039+860.00 0.0000 28.0740 0.00 55.44 5.00 0.00 0.00 277.21 1,233,722.97
6039+870.00 0.0000 26.6200 0.00 54.69 5.00 0.00 0.00 273.47 1,233,449.50
6039+880.00 0.0000 26.3090 0.00 52.93 5.00 0.00 0.00 264.65 1,233,184.86
6039+890.00 0.0000 24.5920 0.00 50.90 5.00 0.00 0.00 254.51 1,232,930.35
6039+900.00 0.0000 21.9460 0.00 46.54 5.00 0.00 0.00 232.69 1,232,697.66
6039+910.00 0.0000 28.9380 0.00 50.88 5.00 0.00 0.00 254.42 1,232,443.24
6039+920.00 0.0000 40.3130 0.00 69.25 5.00 0.00 0.00 346.26 1,232,096.99
6039+940.00 0.0000 38.4170 0.00 78.73 10.00 0.00 0.00 787.30 1,231,309.69
6039+960.00 0.0000 25.7650 0.00 64.18 10.00 0.00 0.00 641.82 1,230,667.87
6039+980.00 0.0000 25.9890 0.00 51.75 10.00 0.00 0.00 517.54 1,230,150.33
6040+000.00 0.0000 14.7880 0.00 40.78 10.00 0.00 0.00 407.77 1,229,742.56
6040+020.00 0.0000 27.3970 0.00 42.19 10.00 0.00 0.00 421.85 1,229,320.71
6040+040.00 0.0000 37.0690 0.00 64.47 10.00 0.00 0.00 644.66 1,228,676.05
6040+060.00 0.0000 32.7940 0.00 69.86 10.00 0.00 0.00 698.63 1,227,977.42
6040+080.00 0.5670 18.5470 0.57 51.34 10.00 5.67 7.37 513.41 1,227,471.38
6040+100.00 5.0980 13.8990 5.67 32.45 10.00 56.65 73.65 324.46 1,227,220.56
6040+120.00 2.4220 17.9930 7.52 31.89 10.00 75.20 97.76 318.92 1,226,999.40
6040+140.00 1.5140 25.7750 3.94 43.77 10.00 39.36 51.17 437.68 1,226,612.89
6040+160.00 0.0000 39.1520 1.51 64.93 10.00 15.14 19.68 649.27 1,225,983.30
6040+180.00 0.0000 22.0700 0.00 61.22 10.00 0.00 0.00 612.22 1,225,371.08
6040+200.00 0.0000 17.5460 0.00 39.62 10.00 0.00 0.00 396.16 1,224,974.92
6040+220.00 0.0000 42.6840 0.00 60.23 10.00 0.00 0.00 602.30 1,224,372.62
6040+240.00 0.0000 40.2540 0.00 82.94 10.00 0.00 0.00 829.38 1,223,543.24
6040+260.00 0.0000 41.0070 0.00 81.26 10.00 0.00 0.00 812.61 1,222,730.63
6040+280.00 0.0000 44.9490 0.00 85.96 10.00 0.00 0.00 859.56 1,221,871.07
6040+300.00 0.0000 42.3580 0.00 87.31 10.00 0.00 0.00 873.07 1,220,998.00
6040+320.00 0.0000 35.6920 0.00 78.05 10.00 0.00 0.00 780.50 1,220,217.50
6040+333.37 0.0000 34.4170 0.00 70.11 6.69 0.00 0.00 468.68 1,219,748.82
276
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6040+340.00 0.0000 35.2360 0.00 69.65 3.31 0.00 0.00 230.90 1,219,517.92
6040+360.00 0.0000 40.2600 0.00 75.50 10.00 0.00 0.00 754.96 1,218,762.96
6040+380.00 0.0000 44.1730 0.00 84.43 10.00 0.00 0.00 844.33 1,217,918.63
6040+400.00 0.0000 47.1210 0.00 91.29 10.00 0.00 0.00 912.94 1,217,005.69
6040+420.00 0.0000 48.6560 0.00 95.78 10.00 0.00 0.00 957.77 1,216,047.92
6040+440.00 0.0000 52.6750 0.00 101.33 10.00 0.00 0.00 1,013.31 1,215,034.61
6040+460.00 0.0000 41.1270 0.00 93.80 10.00 0.00 0.00 938.02 1,214,096.59
6040+480.00 0.0000 35.7680 0.00 76.90 10.00 0.00 0.00 768.95 1,213,327.64
6040+483.37 0.0000 30.3770 0.00 66.15 1.69 0.00 0.00 111.49 1,213,216.16
6040+500.00 0.0000 21.8310 0.00 52.21 8.31 0.00 0.00 434.08 1,212,782.07
6040+520.00 0.0000 43.7970 0.00 65.63 10.00 0.00 0.00 656.28 1,212,125.79
6040+540.00 0.0000 40.4020 0.00 84.20 10.00 0.00 0.00 841.99 1,211,283.80
6040+560.00 0.0000 47.0470 0.00 87.45 10.00 0.00 0.00 874.49 1,210,409.31
6040+580.00 0.0000 42.7260 0.00 89.77 10.00 0.00 0.00 897.73 1,209,511.58
6040+600.00 0.0000 39.8190 0.00 82.55 10.00 0.00 0.00 825.45 1,208,686.13
6040+620.00 0.0000 34.9770 0.00 74.80 10.00 0.00 0.00 747.96 1,207,938.17
6040+640.00 0.0000 33.5230 0.00 68.50 10.00 0.00 0.00 685.00 1,207,253.17
6040+660.00 0.0000 38.4230 0.00 71.95 10.00 0.00 0.00 719.46 1,206,533.71
6040+680.00 0.0000 42.6070 0.00 81.03 10.00 0.00 0.00 810.30 1,205,723.41
6040+700.00 0.0000 54.4270 0.00 97.03 10.00 0.00 0.00 970.34 1,204,753.07
6040+720.00 0.0000 48.3120 0.00 102.74 10.00 0.00 0.00 1,027.39 1,203,725.68
6040+740.00 0.0000 46.6440 0.00 94.96 10.00 0.00 0.00 949.56 1,202,776.12
6040+760.00 0.0000 34.5350 0.00 81.18 10.00 0.00 0.00 811.79 1,201,964.33
6040+780.00 0.0000 44.7670 0.00 79.30 10.00 0.00 0.00 793.02 1,201,171.31
6040+781.48 0.0000 45.7950 0.00 90.56 0.74 0.00 0.00 67.02 1,201,104.30
6040+800.00 0.0000 52.6810 0.00 98.48 9.26 0.00 0.00 911.89 1,200,192.41
6040+820.00 0.0000 35.7200 0.00 88.40 10.00 0.00 0.00 884.01 1,199,308.40
6040+840.00 0.0000 27.5250 0.00 63.25 10.00 0.00 0.00 632.45 1,198,675.95
6040+860.00 0.0000 34.7680 0.00 62.29 10.00 0.00 0.00 622.93 1,198,053.02
6040+880.00 0.0000 39.6840 0.00 74.45 10.00 0.00 0.00 744.52 1,197,308.50
6040+900.00 0.0000 43.1720 0.00 82.86 10.00 0.00 0.00 828.56 1,196,479.94
6040+920.00 0.0000 39.7260 0.00 82.90 10.00 0.00 0.00 828.98 1,195,650.96
6040+931.48 0.0000 35.2850 0.00 75.01 5.74 0.00 0.00 430.56 1,195,220.40
6040+940.00 0.0000 31.8920 0.00 67.18 4.26 0.00 0.00 286.17 1,194,934.22
6040+960.00 0.0000 36.4780 0.00 68.37 10.00 0.00 0.00 683.70 1,194,250.52
6040+980.00 0.0000 46.5210 0.00 83.00 10.00 0.00 0.00 829.99 1,193,420.53
6041+000.00 0.0000 45.8060 0.00 92.33 10.00 0.00 0.00 923.27 1,192,497.26
6041+020.00 0.0000 45.1240 0.00 90.93 10.00 0.00 0.00 909.30 1,191,587.96
6041+040.00 0.0000 57.8090 0.00 102.93 10.00 0.00 0.00 1,029.33 1,190,558.63
6041+060.00 0.0000 62.4450 0.00 120.25 10.00 0.00 0.00 1,202.54 1,189,356.09
6041+080.00 0.0000 48.5200 0.00 110.97 10.00 0.00 0.00 1,109.65 1,188,246.44
6041+100.00 0.0000 62.5430 0.00 111.06 10.00 0.00 0.00 1,110.63 1,187,135.81
6041+120.00 0.0000 45.3980 0.00 107.94 10.00 0.00 0.00 1,079.41 1,186,056.40
6041+140.00 0.0000 48.9620 0.00 94.36 10.00 0.00 0.00 943.60 1,185,112.80
6041+160.00 0.0000 46.0430 0.00 95.01 10.00 0.00 0.00 950.05 1,184,162.75
277
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6041+180.00 0.0000 48.9570 0.00 95.00 10.00 0.00 0.00 950.00 1,183,212.75
6041+200.00 0.0000 52.5160 0.00 101.47 10.00 0.00 0.00 1,014.73 1,182,198.02
6041+220.00 0.0000 62.1670 0.00 114.68 10.00 0.00 0.00 1,146.83 1,181,051.19
6041+240.00 0.0000 56.6810 0.00 118.85 10.00 0.00 0.00 1,188.48 1,179,862.71
6041+260.00 0.0000 42.3090 0.00 98.99 10.00 0.00 0.00 989.90 1,178,872.81
6041+280.00 0.0000 57.7800 0.00 100.09 10.00 0.00 0.00 1,000.89 1,177,871.92
6041+300.00 0.0000 50.2770 0.00 108.06 10.00 0.00 0.00 1,080.57 1,176,791.35
6041+320.00 0.0000 51.5030 0.00 101.78 10.00 0.00 0.00 1,017.80 1,175,773.55
6041+340.00 0.0000 62.0360 0.00 113.54 10.00 0.00 0.00 1,135.39 1,174,638.16
6041+360.00 0.0000 52.8020 0.00 114.84 10.00 0.00 0.00 1,148.38 1,173,489.78
6041+380.00 0.0000 69.7860 0.00 122.59 10.00 0.00 0.00 1,225.88 1,172,263.90
6041+390.00 0.0000 58.7000 0.00 128.49 5.00 0.00 0.00 642.43 1,171,621.47
6041+400.00 0.0000 47.6870 0.00 106.39 5.00 0.00 0.00 531.94 1,171,089.54
6041+410.00 0.0000 53.1750 0.00 100.86 5.00 0.00 0.00 504.31 1,170,585.23
6041+420.00 0.0000 57.2610 0.00 110.44 5.00 0.00 0.00 552.18 1,170,033.05
6041+430.00 0.0000 61.6150 0.00 118.88 5.00 0.00 0.00 594.38 1,169,438.67
6041+440.00 0.0000 65.6160 0.00 127.23 5.00 0.00 0.00 636.16 1,168,802.51
6041+450.00 0.0000 61.5140 0.00 127.13 5.00 0.00 0.00 635.65 1,168,166.86
6041+460.00 0.0000 62.4580 0.00 123.97 5.00 0.00 0.00 619.86 1,167,547.00
6041+470.00 0.0000 62.2890 0.00 124.75 5.00 0.00 0.00 623.74 1,166,923.27
6041+480.00 0.0000 60.3790 0.00 122.67 5.00 0.00 0.00 613.34 1,166,309.93
6041+490.00 0.0000 50.0170 0.00 110.40 5.00 0.00 0.00 551.98 1,165,757.95
6041+500.00 0.0000 41.9230 0.00 91.94 5.00 0.00 0.00 459.70 1,165,298.25
6041+510.00 0.0000 42.6180 0.00 84.54 5.00 0.00 0.00 422.71 1,164,875.54
6041+520.00 0.0000 44.5420 0.00 87.16 5.00 0.00 0.00 435.80 1,164,439.74
6041+530.00 0.0000 49.3790 0.00 93.92 5.00 0.00 0.00 469.61 1,163,970.14
6041+540.00 0.0000 51.2530 0.00 100.63 5.00 0.00 0.00 503.16 1,163,466.98
6041+550.00 0.0000 46.2120 0.00 97.47 5.00 0.00 0.00 487.33 1,162,979.65
6041+560.00 0.0000 40.6870 0.00 86.90 5.00 0.00 0.00 434.50 1,162,545.16
6041+564.54 0.0000 38.9090 0.00 79.60 2.27 0.00 0.00 180.84 1,162,364.31
6041+570.00 0.0000 35.6840 0.00 74.59 2.73 0.00 0.00 203.49 1,162,160.82
6041+580.00 0.0000 30.8840 0.00 66.57 5.00 0.00 0.00 332.84 1,161,827.98
6041+584.54 0.0000 32.1220 0.00 63.01 2.27 0.00 0.00 143.15 1,161,684.83
6041+600.00 0.0000 36.5630 0.00 68.69 7.73 0.00 0.00 530.80 1,161,154.04
6041+620.00 0.0000 48.9810 0.00 85.54 10.00 0.00 0.00 855.44 1,160,298.60
6041+640.00 0.0000 58.4370 0.00 107.42 10.00 0.00 0.00 1,074.18 1,159,224.42
6041+660.00 0.0000 57.9800 0.00 116.42 10.00 0.00 0.00 1,164.17 1,158,060.25
6041+680.00 0.0000 28.5640 0.00 86.54 10.00 0.00 0.00 865.44 1,157,194.81
6041+700.00 0.0000 18.1490 0.00 46.71 10.00 0.00 0.00 467.13 1,156,727.68
6041+720.00 0.0000 34.4800 0.00 52.63 10.00 0.00 0.00 526.29 1,156,201.39
6041+740.00 0.0000 31.6640 0.00 66.14 10.00 0.00 0.00 661.44 1,155,539.95
6041+760.00 0.0000 49.5260 0.00 81.19 10.00 0.00 0.00 811.90 1,154,728.05
6041+780.00 0.0000 49.8960 0.00 99.42 10.00 0.00 0.00 994.22 1,153,733.83
6041+800.00 0.0000 55.3310 0.00 105.23 10.00 0.00 0.00 1,052.27 1,152,681.56
6041+820.00 0.0000 51.9770 0.00 107.31 10.00 0.00 0.00 1,073.08 1,151,608.48
278
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6041+840.00 0.0000 41.3410 0.00 93.32 10.00 0.00 0.00 933.18 1,150,675.30
6041+860.00 0.0000 24.2310 0.00 65.57 10.00 0.00 0.00 655.72 1,150,019.58
6041+880.00 0.0000 19.3770 0.00 43.61 10.00 0.00 0.00 436.08 1,149,583.50
6041+900.00 0.0000 45.1880 0.00 64.57 10.00 0.00 0.00 645.65 1,148,937.85
6041+920.00 0.0000 40.0920 0.00 85.28 10.00 0.00 0.00 852.80 1,148,085.05
6041+940.00 0.0000 40.7380 0.00 80.83 10.00 0.00 0.00 808.30 1,147,276.75
6041+960.00 0.0000 26.4170 0.00 67.16 10.00 0.00 0.00 671.55 1,146,605.20
6041+980.00 0.4870 8.4680 0.49 34.89 10.00 4.87 6.33 348.85 1,146,262.68
6042+000.00 0.0000 39.5020 0.49 47.97 10.00 4.87 6.33 479.70 1,145,789.31
6042+020.00 0.0000 32.3200 0.00 71.82 10.00 0.00 0.00 718.22 1,145,071.09
6042+040.00 0.0000 21.4130 0.00 53.73 10.00 0.00 0.00 537.33 1,144,533.76
6042+060.00 0.5720 15.4640 0.57 36.88 10.00 5.72 7.44 368.77 1,144,172.43
6042+080.00 0.0000 21.3400 0.57 36.80 10.00 5.72 7.44 368.04 1,143,811.82
6042+100.00 0.0000 37.1110 0.00 58.45 10.00 0.00 0.00 584.51 1,143,227.31
6042+120.00 0.0000 43.9080 0.00 81.02 10.00 0.00 0.00 810.19 1,142,417.12
6042+140.00 1.3680 12.6380 1.37 56.55 10.00 13.68 17.78 565.46 1,141,869.45
6042+160.00 10.5830 0.4860 11.95 13.12 10.00 119.51 155.36 131.24 1,141,893.57
6042+180.00 18.2450 0.2180 28.83 0.70 10.00 288.28 374.76 7.04 1,142,261.29
6042+200.00 5.1350 0.3360 23.38 0.55 10.00 233.80 303.94 5.54 1,142,559.69
6042+220.00 0.0000 16.8820 5.14 17.22 10.00 51.35 66.76 172.18 1,142,454.27
6042+240.00 0.0000 30.8090 0.00 47.69 10.00 0.00 0.00 476.91 1,141,977.36
6042+260.00 0.0000 36.8450 0.00 67.65 10.00 0.00 0.00 676.54 1,141,300.82
6042+280.00 0.0000 35.7710 0.00 72.62 10.00 0.00 0.00 726.16 1,140,574.66
6042+300.00 0.0000 25.9000 0.00 61.67 10.00 0.00 0.00 616.71 1,139,957.95
6042+320.00 0.0000 29.2830 0.00 55.18 10.00 0.00 0.00 551.83 1,139,406.12
6042+340.00 1.6810 0.7610 1.68 30.04 10.00 16.81 21.85 300.44 1,139,127.53
6042+360.00 0.8180 1.9630 2.50 2.72 10.00 24.99 32.49 27.24 1,139,132.78
6042+380.00 0.0000 32.1800 0.82 34.14 10.00 8.18 10.63 341.43 1,138,801.98
6042+400.00 0.0000 19.0620 0.00 51.24 10.00 0.00 0.00 512.42 1,138,289.56
6042+420.00 0.0000 18.7560 0.00 37.82 10.00 0.00 0.00 378.18 1,137,911.38
6042+440.00 0.0000 30.4100 0.00 49.17 10.00 0.00 0.00 491.66 1,137,419.72
6042+460.00 0.0000 28.6770 0.00 59.09 10.00 0.00 0.00 590.87 1,136,828.85
6042+480.00 0.0000 39.0900 0.00 67.77 10.00 0.00 0.00 677.67 1,136,151.18
6042+500.00 0.0000 40.0090 0.00 79.10 10.00 0.00 0.00 790.99 1,135,360.19
6042+520.00 0.0000 30.9830 0.00 70.99 10.00 0.00 0.00 709.92 1,134,650.27
6042+540.00 0.0000 27.8780 0.00 58.86 10.00 0.00 0.00 588.61 1,134,061.66
6042+560.00 0.0000 28.0580 0.00 55.94 10.00 0.00 0.00 559.36 1,133,502.30
6042+580.00 0.0000 35.5650 0.00 63.62 10.00 0.00 0.00 636.23 1,132,866.07
6042+600.00 0.0000 42.9900 0.00 78.56 10.00 0.00 0.00 785.55 1,132,080.52
6042+620.00 0.0000 39.1530 0.00 82.14 10.00 0.00 0.00 821.43 1,131,259.09
6042+640.00 0.0000 41.2090 0.00 80.36 10.00 0.00 0.00 803.62 1,130,455.47
6042+660.00 0.0000 35.2170 0.00 76.43 10.00 0.00 0.00 764.26 1,129,691.21
6042+680.00 0.0000 46.6230 0.00 81.84 10.00 0.00 0.00 818.40 1,128,872.81
6042+700.00 0.0000 26.2310 0.00 72.85 10.00 0.00 0.00 728.54 1,128,144.27
6042+720.00 0.0000 31.7500 0.00 57.98 10.00 0.00 0.00 579.81 1,127,564.46
279
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6042+740.00 0.0000 49.3880 0.00 81.14 10.00 0.00 0.00 811.38 1,126,753.08
6042+760.00 0.0000 35.6770 0.00 85.07 10.00 0.00 0.00 850.65 1,125,902.43
6042+780.00 0.0000 22.7890 0.00 58.47 10.00 0.00 0.00 584.66 1,125,317.77
6042+800.00 0.0000 32.6060 0.00 55.40 10.00 0.00 0.00 553.95 1,124,763.82
6042+820.00 0.0000 28.3370 0.00 60.94 10.00 0.00 0.00 609.43 1,124,154.39
6042+840.00 0.0000 34.7800 0.00 63.12 10.00 0.00 0.00 631.17 1,123,523.22
6042+860.00 0.0000 32.1820 0.00 66.96 10.00 0.00 0.00 669.62 1,122,853.60
6042+880.00 0.0000 17.1690 0.00 49.35 10.00 0.00 0.00 493.51 1,122,360.09
6042+900.00 0.0000 31.3210 0.00 48.49 10.00 0.00 0.00 484.90 1,121,875.19
6042+920.00 0.0000 28.7580 0.00 60.08 10.00 0.00 0.00 600.79 1,121,274.40
6042+940.00 0.0000 31.1270 0.00 59.89 10.00 0.00 0.00 598.85 1,120,675.55
6042+960.00 0.0000 33.5270 0.00 64.65 10.00 0.00 0.00 646.54 1,120,029.01
6042+980.00 0.0000 23.7970 0.00 57.32 10.00 0.00 0.00 573.24 1,119,455.77
6043+000.00 0.0000 24.4960 0.00 48.29 10.00 0.00 0.00 482.93 1,118,972.84
6043+020.00 0.3440 11.3830 0.34 35.88 10.00 3.44 4.47 358.79 1,118,618.52
6043+040.00 1.9560 0.7110 2.30 12.09 10.00 23.00 29.90 120.94 1,118,527.48
6043+060.00 0.0000 33.1460 1.96 33.86 10.00 19.56 25.43 338.57 1,118,214.34
6043+080.00 0.0000 24.0540 0.00 57.20 10.00 0.00 0.00 572.00 1,117,642.34
6043+100.00 0.0000 34.6260 0.00 58.68 10.00 0.00 0.00 586.80 1,117,055.54
6043+120.00 0.0000 23.1730 0.00 57.80 10.00 0.00 0.00 577.99 1,116,477.55
6043+140.00 0.0000 27.7110 0.00 50.88 10.00 0.00 0.00 508.84 1,115,968.71
6043+160.00 0.0000 35.0110 0.00 62.72 10.00 0.00 0.00 627.22 1,115,341.49
6043+180.00 0.0000 37.3050 0.00 72.32 10.00 0.00 0.00 723.16 1,114,618.33
6043+200.00 0.0000 38.9830 0.00 76.29 10.00 0.00 0.00 762.88 1,113,855.45
6043+220.00 0.0000 38.6200 0.00 77.60 10.00 0.00 0.00 776.03 1,113,079.42
6043+240.00 0.0000 29.4500 0.00 68.07 10.00 0.00 0.00 680.70 1,112,398.72
6043+260.00 0.0000 21.7380 0.00 51.19 10.00 0.00 0.00 511.88 1,111,886.84
6043+280.00 0.0000 24.4690 0.00 46.21 10.00 0.00 0.00 462.07 1,111,424.77
6043+300.00 0.0000 16.6900 0.00 41.16 10.00 0.00 0.00 411.59 1,111,013.18
6043+320.00 0.0000 20.3630 0.00 37.05 10.00 0.00 0.00 370.53 1,110,642.65
6043+340.00 0.0000 23.5460 0.00 43.91 10.00 0.00 0.00 439.09 1,110,203.56
6043+360.00 0.0000 29.5900 0.00 53.14 10.00 0.00 0.00 531.36 1,109,672.20
6043+380.00 0.0000 22.4100 0.00 52.00 10.00 0.00 0.00 520.00 1,109,152.20
6043+400.00 0.0000 28.4270 0.00 50.84 10.00 0.00 0.00 508.37 1,108,643.83
6043+420.00 0.0000 40.2460 0.00 68.67 10.00 0.00 0.00 686.73 1,107,957.10
6043+440.00 0.0000 36.0630 0.00 76.31 10.00 0.00 0.00 763.09 1,107,194.01
6043+460.00 0.0000 30.5480 0.00 66.61 10.00 0.00 0.00 666.11 1,106,527.90
6043+480.00 0.0000 36.0780 0.00 66.63 10.00 0.00 0.00 666.26 1,105,861.64
6043+500.00 0.0000 41.3920 0.00 77.47 10.00 0.00 0.00 774.70 1,105,086.94
6043+520.00 0.0000 41.0580 0.00 82.45 10.00 0.00 0.00 824.50 1,104,262.44
6043+540.00 0.0000 44.4260 0.00 85.48 10.00 0.00 0.00 854.84 1,103,407.60
6043+560.00 0.0000 41.0930 0.00 85.52 10.00 0.00 0.00 855.19 1,102,552.41
6043+580.00 0.0000 42.3790 0.00 83.47 10.00 0.00 0.00 834.72 1,101,717.69
6043+600.00 0.0000 39.3930 0.00 81.77 10.00 0.00 0.00 817.72 1,100,899.97
6043+620.00 0.0000 38.8800 0.00 78.27 10.00 0.00 0.00 782.73 1,100,117.24
280
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6043+640.00 0.0000 35.9020 0.00 74.78 10.00 0.00 0.00 747.82 1,099,369.42
6043+660.00 0.0000 19.3410 0.00 55.24 10.00 0.00 0.00 552.43 1,098,816.99
6043+680.00 0.0000 24.4190 0.00 43.76 10.00 0.00 0.00 437.60 1,098,379.39
6043+700.00 1.3170 5.3880 1.32 29.81 10.00 13.17 17.12 298.07 1,098,098.44
6043+720.00 0.0000 22.0110 1.32 27.40 10.00 13.17 17.12 273.99 1,097,841.57
6043+740.00 0.0000 36.5020 0.00 58.51 10.00 0.00 0.00 585.13 1,097,256.44
6043+760.00 0.0000 39.7530 0.00 76.26 10.00 0.00 0.00 762.55 1,096,493.89
6043+780.00 0.0000 36.0910 0.00 75.84 10.00 0.00 0.00 758.44 1,095,735.45
6043+800.00 0.0000 31.2430 0.00 67.33 10.00 0.00 0.00 673.34 1,095,062.11
6043+820.00 0.0000 29.6900 0.00 60.93 10.00 0.00 0.00 609.33 1,094,452.78
6043+840.00 0.0000 38.0270 0.00 67.72 10.00 0.00 0.00 677.17 1,093,775.61
6043+860.00 0.0000 27.6330 0.00 65.66 10.00 0.00 0.00 656.60 1,093,119.01
6043+880.00 0.0000 30.9880 0.00 58.62 10.00 0.00 0.00 586.21 1,092,532.80
6043+900.00 0.0000 35.6410 0.00 66.63 10.00 0.00 0.00 666.29 1,091,866.51
6043+920.00 0.0000 37.2800 0.00 72.92 10.00 0.00 0.00 729.21 1,091,137.30
6043+940.00 0.0000 28.0290 0.00 65.31 10.00 0.00 0.00 653.09 1,090,484.21
6043+960.00 0.0000 31.5720 0.00 59.60 10.00 0.00 0.00 596.01 1,089,888.20
6043+980.00 0.0000 31.0410 0.00 62.61 10.00 0.00 0.00 626.13 1,089,262.07
6044+000.00 0.0000 37.8700 0.00 68.91 10.00 0.00 0.00 689.11 1,088,572.96
6044+020.00 0.0000 35.7390 0.00 73.61 10.00 0.00 0.00 736.09 1,087,836.87
6044+040.00 0.0000 40.5110 0.00 76.25 10.00 0.00 0.00 762.50 1,087,074.37
6044+060.00 0.0000 49.3250 0.00 89.84 10.00 0.00 0.00 898.36 1,086,176.01
6044+080.00 0.0000 31.1210 0.00 80.45 10.00 0.00 0.00 804.46 1,085,371.55
6044+100.00 0.0000 24.1620 0.00 55.28 10.00 0.00 0.00 552.83 1,084,818.72
6044+120.00 0.0000 28.5590 0.00 52.72 10.00 0.00 0.00 527.21 1,084,291.51
6044+140.00 0.0000 16.4050 0.00 44.96 10.00 0.00 0.00 449.64 1,083,841.87
6044+160.00 0.0000 34.1990 0.00 50.60 10.00 0.00 0.00 506.04 1,083,335.83
6044+180.00 0.0000 25.3070 0.00 59.51 10.00 0.00 0.00 595.06 1,082,740.77
6044+185.00 0.0000 21.5400 0.00 46.85 2.50 0.00 0.00 117.12 1,082,623.66
6044+185.00 0.0000 21.7310 0.00 43.27 0.00 0.00 0.00 0.00 1,082,623.66
6044+200.00 0.0000 17.6930 0.00 39.42 7.50 0.00 0.00 295.68 1,082,327.98
6044+220.00 0.0000 33.0110 0.00 50.70 10.00 0.00 0.00 507.04 1,081,820.94
6044+240.00 0.0000 33.8510 0.00 66.86 10.00 0.00 0.00 668.62 1,081,152.32
6044+260.00 0.0000 27.6130 0.00 61.46 10.00 0.00 0.00 614.64 1,080,537.68
6044+280.00 0.0000 32.3360 0.00 59.95 10.00 0.00 0.00 599.49 1,079,938.19
6044+300.00 0.0000 28.6600 0.00 61.00 10.00 0.00 0.00 609.96 1,079,328.23
6044+320.00 0.0000 27.7730 0.00 56.43 10.00 0.00 0.00 564.33 1,078,763.90
6044+320.00 0.0000 27.7730 0.00 55.55 0.00 0.00 0.00 0.00 1,078,763.90
6044+340.00 0.0000 17.4640 0.00 45.24 10.00 0.00 0.00 452.37 1,078,311.53
6044+360.00 0.0000 22.0250 0.00 39.49 10.00 0.00 0.00 394.89 1,077,916.64
6044+370.00 0.0000 22.1210 0.00 44.15 5.00 0.00 0.00 220.73 1,077,695.91
6044+380.00 0.0000 0.0060 0.00 22.13 5.00 0.00 0.00 110.64 1,077,585.27
6044+400.00 0.0020 0.0040 0.00 0.01 10.00 0.02 0.03 0.10 1,077,585.20
6044+420.00 0.0000 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,585.14
6044+440.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,585.06
281
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6044+460.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,585.00
6044+480.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,584.94
6044+500.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,584.87
6044+520.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,584.79
6044+540.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 1,077,584.70
6044+560.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 1,077,584.61
6044+580.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,584.53
6044+600.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,584.47
6044+620.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,584.40
6044+640.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 1,077,584.31
6044+660.00 0.0020 0.0040 0.00 0.01 10.00 0.02 0.03 0.09 1,077,584.25
6044+680.00 0.0010 0.0040 0.00 0.01 10.00 0.03 0.04 0.08 1,077,584.21
6044+700.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,584.15
6044+720.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,584.08
6044+740.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,584.00
6044+760.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,583.92
6044+780.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,583.86
6044+800.00 0.0030 0.0040 0.00 0.01 10.00 0.04 0.05 0.08 1,077,583.83
6044+820.00 0.0000 0.0040 0.00 0.01 10.00 0.03 0.04 0.08 1,077,583.79
6044+840.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,583.71
6044+860.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,583.63
6044+880.00 0.0020 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,583.57
6044+900.00 0.0010 0.0040 0.00 0.01 10.00 0.03 0.04 0.08 1,077,583.53
6044+920.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,583.47
6044+940.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,583.39
6044+960.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,583.31
6044+980.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 1,077,583.22
6045+000.00 0.0020 0.0040 0.00 0.01 10.00 0.02 0.03 0.09 1,077,583.15
6045+020.00 0.0000 0.0050 0.00 0.01 10.00 0.02 0.03 0.09 1,077,583.09
6045+040.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 1,077,582.99
6045+060.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 1,077,582.89
6045+080.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 1,077,582.80
6045+100.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,582.73
6045+120.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,582.66
6045+140.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,582.58
6045+160.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,582.52
6045+180.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 1,077,582.44
6045+200.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 1,077,582.34
6045+220.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 1,077,582.25
6045+240.00 0.0010 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 1,077,582.17
6045+260.00 0.0010 0.0050 0.00 0.01 10.00 0.02 0.03 0.10 1,077,582.10
6045+280.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.10 1,077,582.01
6045+300.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 1,077,581.92
6045+320.00 0.0010 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 1,077,581.85
6045+340.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 1,077,581.77
282
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6045+360.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,581.70
6045+380.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,581.63
6045+400.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,581.55
6045+420.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,581.49
6045+440.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,581.42
6045+460.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,581.34
6045+480.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,581.26
6045+500.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,581.18
6045+520.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,581.10
6045+540.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,581.02
6045+560.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,580.95
6045+580.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,580.89
6045+600.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,580.81
6045+620.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,580.74
6045+640.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,580.67
6045+660.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 1,077,580.58
6045+680.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 1,077,580.48
6045+700.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 1,077,580.38
6045+720.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 1,077,580.31
6045+740.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 1,077,580.23
6045+760.00 0.0010 0.0050 0.00 0.01 10.00 0.01 0.01 0.10 1,077,580.14
6045+780.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 1,077,580.06
6045+800.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,580.00
6045+820.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.93
6045+840.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,579.85
6045+860.00 0.0020 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,579.80
6045+880.00 0.0000 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,579.74
6045+900.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.68
6045+920.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.61
6045+940.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.54
6045+960.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.47
6045+980.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.41
6046+000.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,579.35
6046+020.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.29
6046+040.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,579.21
6046+060.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.14
6046+080.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.07
6046+100.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,579.01
6046+120.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 1,077,578.93
6046+140.00 0.0010 0.0050 0.00 0.01 10.00 0.01 0.01 0.10 1,077,578.84
6046+160.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 1,077,578.76
6046+180.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.09 1,077,578.67
6046+200.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 1,077,578.60
6046+220.00 0.0020 0.0040 0.00 0.01 10.00 0.03 0.04 0.08 1,077,578.56
6046+240.00 0.0000 0.0050 0.00 0.01 10.00 0.02 0.03 0.09 1,077,578.49
283
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6046+260.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.09 1,077,578.40
6046+280.00 0.0000 0.0060 0.00 0.01 10.00 0.00 0.00 0.10 1,077,578.30
6046+300.00 0.0010 0.0050 0.00 0.01 10.00 0.01 0.01 0.11 1,077,578.21
6046+320.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 1,077,578.13
6046+340.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,578.05
6046+360.00 0.0010 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 1,077,577.97
6046+380.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 1,077,577.89
6046+400.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,577.83
6046+420.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,577.76
6046+440.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,577.69
6046+460.00 0.0020 0.0040 0.00 0.01 10.00 0.03 0.04 0.08 1,077,577.65
6046+480.00 0.0000 0.0050 0.00 0.01 10.00 0.02 0.03 0.09 1,077,577.59
6046+500.00 0.0000 0.0050 0.00 0.01 10.00 0.00 0.00 0.10 1,077,577.49
6046+520.00 0.0020 0.0040 0.00 0.01 10.00 0.02 0.03 0.09 1,077,577.42
6046+540.00 0.0000 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,577.37
6046+560.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,577.30
6046+580.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,577.24
6046+600.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,577.17
6046+620.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 1,077,577.09
6046+640.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.09 1,077,577.02
6046+660.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,576.96
6046+680.00 0.0000 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,576.89
6046+700.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,576.83
6046+720.00 0.0000 0.0060 0.00 0.01 10.00 0.01 0.01 0.10 1,077,576.74
6046+740.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.10 1,077,576.64
6046+760.00 0.0000 0.0040 0.00 0.01 10.00 0.00 0.00 0.08 1,077,576.56
6046+780.00 0.0010 0.0040 0.00 0.01 10.00 0.01 0.01 0.08 1,077,576.49
6046+800.00 0.0010 0.0040 0.00 0.01 10.00 0.02 0.03 0.08 1,077,576.44
6046+820.00 0.0000 0.0050 0.00 0.01 10.00 0.01 0.01 0.09 1,077,576.36
6046+840.00 0.0000 28.0620 0.00 28.07 10.00 0.00 0.00 280.67 1,077,295.69
6046+860.00 0.2760 10.7150 0.28 38.78 10.00 2.76 3.59 387.77 1,076,911.51
6046+880.00 0.0000 40.9420 0.28 51.66 10.00 2.76 3.59 516.57 1,076,398.53
6046+900.00 0.0000 28.1880 0.00 69.13 10.00 0.00 0.00 691.30 1,075,707.23
6046+920.00 0.0000 26.2620 0.00 54.45 10.00 0.00 0.00 544.50 1,075,162.73
6046+940.00 0.0000 44.8870 0.00 71.15 10.00 0.00 0.00 711.49 1,074,451.24
6046+960.00 0.0000 46.0380 0.00 90.93 10.00 0.00 0.00 909.25 1,073,541.99
6046+980.00 0.0000 51.4790 0.00 97.52 10.00 0.00 0.00 975.17 1,072,566.82
6047+000.00 0.0000 30.2820 0.00 81.76 10.00 0.00 0.00 817.61 1,071,749.21
6047+000.00 0.0000 31.2890 0.00 61.57 0.00 0.00 0.00 0.00 1,071,749.21
6047+020.00 0.0000 30.0130 0.00 61.30 10.00 0.00 0.00 613.02 1,071,136.19
6047+040.00 0.0000 38.4010 0.00 68.41 10.00 0.00 0.00 684.14 1,070,452.05
6047+060.00 0.0000 29.8100 0.00 68.21 10.00 0.00 0.00 682.11 1,069,769.94
6047+060.00 0.0000 29.8100 0.00 59.62 0.00 0.00 0.00 0.00 1,069,769.94
6047+080.00 0.0000 42.6670 0.00 72.48 10.00 0.00 0.00 724.77 1,069,045.17
6047+100.00 0.0000 28.0530 0.00 70.72 10.00 0.00 0.00 707.20 1,068,337.97
284
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6047+120.00 0.0000 28.1490 0.00 56.20 10.00 0.00 0.00 562.02 1,067,775.95
6047+140.00 0.0000 40.8260 0.00 68.98 10.00 0.00 0.00 689.75 1,067,086.20
6047+160.00 0.0000 39.1440 0.00 79.97 10.00 0.00 0.00 799.70 1,066,286.50
6047+180.00 0.0000 34.4440 0.00 73.59 10.00 0.00 0.00 735.88 1,065,550.62
6047+200.00 0.0000 27.4040 0.00 61.85 10.00 0.00 0.00 618.48 1,064,932.14
6047+220.00 0.0000 44.7830 0.00 72.19 10.00 0.00 0.00 721.87 1,064,210.27
6047+240.00 0.0000 44.5730 0.00 89.36 10.00 0.00 0.00 893.56 1,063,316.71
6047+260.00 0.0000 34.9650 0.00 79.54 10.00 0.00 0.00 795.38 1,062,521.33
6047+280.00 0.0000 32.6680 0.00 67.63 10.00 0.00 0.00 676.33 1,061,845.00
6047+300.00 0.0000 30.8900 0.00 63.56 10.00 0.00 0.00 635.58 1,061,209.42
6047+320.00 0.0000 33.5620 0.00 64.45 10.00 0.00 0.00 644.52 1,060,564.90
6047+340.00 0.0000 30.0500 0.00 63.61 10.00 0.00 0.00 636.12 1,059,928.78
6047+360.00 0.0000 36.0200 0.00 66.07 10.00 0.00 0.00 660.70 1,059,268.08
6047+380.00 0.0000 26.0130 0.00 62.03 10.00 0.00 0.00 620.33 1,058,647.75
6047+400.00 0.0000 17.2720 0.00 43.29 10.00 0.00 0.00 432.85 1,058,214.90
6047+420.00 0.0000 16.5650 0.00 33.84 10.00 0.00 0.00 338.37 1,057,876.53
6047+440.00 0.0000 35.5030 0.00 52.07 10.00 0.00 0.00 520.68 1,057,355.85
6047+460.00 0.0000 31.2810 0.00 66.78 10.00 0.00 0.00 667.84 1,056,688.01
6047+480.00 0.0000 10.8110 0.00 42.09 10.00 0.00 0.00 420.92 1,056,267.09
6047+500.00 0.0000 8.8540 0.00 19.67 10.00 0.00 0.00 196.65 1,056,070.44
6047+510.00 0.0000 18.2140 0.00 27.07 5.00 0.00 0.00 135.34 1,055,935.10
6047+510.00 0.0000 16.3800 0.00 34.59 0.00 0.00 0.00 0.00 1,055,935.10
6047+520.00 0.0000 29.7090 0.00 46.09 5.00 0.00 0.00 230.45 1,055,704.65
6047+540.00 0.0000 18.9350 0.00 48.64 10.00 0.00 0.00 486.44 1,055,218.21
6047+560.00 0.0000 20.1010 0.00 39.04 10.00 0.00 0.00 390.36 1,054,827.85
6047+580.00 0.0000 28.5640 0.00 48.67 10.00 0.00 0.00 486.65 1,054,341.20
6047+580.00 0.0000 28.7620 0.00 57.33 0.00 0.00 0.00 0.00 1,054,341.20
6047+600.00 0.0000 17.7420 0.00 46.50 10.00 0.00 0.00 465.04 1,053,876.16
6047+620.00 0.6890 18.0260 0.69 35.77 10.00 6.89 8.96 357.68 1,053,527.44
6047+640.00 0.0000 28.3610 0.69 46.39 10.00 6.89 8.96 463.87 1,053,072.53
6047+660.00 0.0000 25.6960 0.00 54.06 10.00 0.00 0.00 540.57 1,052,531.96
6047+680.00 0.0000 27.5740 0.00 53.27 10.00 0.00 0.00 532.70 1,051,999.26
6047+700.00 0.0000 26.7030 0.00 54.28 10.00 0.00 0.00 542.77 1,051,456.49
6047+720.00 0.0000 22.4490 0.00 49.15 10.00 0.00 0.00 491.52 1,050,964.97
6047+740.00 0.0000 14.7650 0.00 37.21 10.00 0.00 0.00 372.14 1,050,592.83
6047+760.00 0.0000 27.2390 0.00 42.00 10.00 0.00 0.00 420.04 1,050,172.79
6047+780.00 0.0000 14.4230 0.00 41.66 10.00 0.00 0.00 416.62 1,049,756.17
6047+800.00 0.0000 23.6340 0.00 38.06 10.00 0.00 0.00 380.57 1,049,375.60
6047+820.00 0.0000 20.1680 0.00 43.80 10.00 0.00 0.00 438.02 1,048,937.58
6047+840.00 0.0000 30.4000 0.00 50.57 10.00 0.00 0.00 505.68 1,048,431.90
6047+860.00 0.0000 27.7990 0.00 58.20 10.00 0.00 0.00 581.99 1,047,849.91
6047+880.00 0.0000 32.8070 0.00 60.61 10.00 0.00 0.00 606.06 1,047,243.85
6047+900.00 0.0000 31.9890 0.00 64.80 10.00 0.00 0.00 647.96 1,046,595.89
6047+920.00 0.0000 35.0640 0.00 67.05 10.00 0.00 0.00 670.53 1,045,925.36
6047+940.00 0.0000 43.7100 0.00 78.77 10.00 0.00 0.00 787.74 1,045,137.62
285
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6047+960.00 0.0000 35.0120 0.00 78.72 10.00 0.00 0.00 787.22 1,044,350.40
6047+980.00 0.0000 36.0560 0.00 71.07 10.00 0.00 0.00 710.68 1,043,639.72
6048+000.00 0.0000 34.9120 0.00 70.97 10.00 0.00 0.00 709.68 1,042,930.04
6048+020.00 0.0000 40.1340 0.00 75.05 10.00 0.00 0.00 750.46 1,042,179.58
6048+040.00 0.0000 49.3370 0.00 89.47 10.00 0.00 0.00 894.71 1,041,284.87
6048+060.00 0.0000 55.3590 0.00 104.70 10.00 0.00 0.00 1,046.96 1,040,237.91
6048+080.00 0.0000 55.8360 0.00 111.20 10.00 0.00 0.00 1,111.95 1,039,125.96
6048+100.00 0.0000 50.7990 0.00 106.64 10.00 0.00 0.00 1,066.35 1,038,059.61
6048+120.00 0.0000 54.1400 0.00 104.94 10.00 0.00 0.00 1,049.39 1,037,010.22
6048+140.00 0.0000 40.6390 0.00 94.78 10.00 0.00 0.00 947.79 1,036,062.43
6048+160.00 0.0000 38.9090 0.00 79.55 10.00 0.00 0.00 795.48 1,035,266.95
6048+180.00 0.0000 49.6670 0.00 88.58 10.00 0.00 0.00 885.76 1,034,381.19
6048+200.00 0.0000 46.2340 0.00 95.90 10.00 0.00 0.00 959.01 1,033,422.18
6048+220.00 0.0000 50.5610 0.00 96.80 10.00 0.00 0.00 967.95 1,032,454.23
6048+240.00 0.0000 37.2430 0.00 87.80 10.00 0.00 0.00 878.04 1,031,576.19
6048+260.00 0.0000 31.9230 0.00 69.17 10.00 0.00 0.00 691.66 1,030,884.53
6048+280.00 0.0000 38.3870 0.00 70.31 10.00 0.00 0.00 703.10 1,030,181.43
6048+300.00 0.0000 40.4170 0.00 78.80 10.00 0.00 0.00 788.04 1,029,393.39
6048+320.00 0.0000 32.6200 0.00 73.04 10.00 0.00 0.00 730.37 1,028,663.02
6048+340.00 0.0000 37.5840 0.00 70.20 10.00 0.00 0.00 702.04 1,027,960.98
6048+360.00 0.0000 32.7720 0.00 70.36 10.00 0.00 0.00 703.56 1,027,257.42
6048+380.00 0.0000 23.1870 0.00 55.96 10.00 0.00 0.00 559.59 1,026,697.83
6048+400.00 0.0000 36.3250 0.00 59.51 10.00 0.00 0.00 595.12 1,026,102.71
6048+420.00 0.0000 32.0800 0.00 68.41 10.00 0.00 0.00 684.05 1,025,418.66
6048+440.00 0.0000 35.2930 0.00 67.37 10.00 0.00 0.00 673.73 1,024,744.93
6048+460.00 0.0000 35.4660 0.00 70.76 10.00 0.00 0.00 707.59 1,024,037.34
6048+480.00 0.0000 17.2710 0.00 52.74 10.00 0.00 0.00 527.37 1,023,509.97
6048+500.00 0.0000 24.9040 0.00 42.18 10.00 0.00 0.00 421.75 1,023,088.22
6048+520.00 0.0000 18.1060 0.00 43.01 10.00 0.00 0.00 430.10 1,022,658.12
6048+540.00 9.7960 0.1670 9.80 18.27 10.00 97.96 127.35 182.73 1,022,602.74
6048+560.00 4.5330 0.2100 14.33 0.38 10.00 143.29 186.28 3.77 1,022,785.24
6048+580.00 0.0000 13.1440 4.53 13.35 10.00 45.33 58.93 133.54 1,022,710.63
6048+600.00 0.0000 14.9200 0.00 28.06 10.00 0.00 0.00 280.64 1,022,429.99
6048+620.00 0.5840 13.2210 0.58 28.14 10.00 5.84 7.59 281.41 1,022,156.17
6048+640.00 0.0000 16.1040 0.58 29.33 10.00 5.84 7.59 293.25 1,021,870.52
6048+660.00 1.6920 3.6780 1.69 19.78 10.00 16.92 22.00 197.82 1,021,694.69
6048+680.00 1.5090 3.3080 3.20 6.99 10.00 32.01 41.61 69.86 1,021,666.44
6048+700.00 0.0000 13.7320 1.51 17.04 10.00 15.09 19.62 170.40 1,021,515.66
6048+720.00 7.2500 0.1730 7.25 13.91 10.00 72.50 94.25 139.05 1,021,470.86
6048+740.00 9.3690 0.1730 16.62 0.35 10.00 166.19 216.05 3.46 1,021,683.45
6048+760.00 0.0000 14.1060 9.37 14.28 10.00 93.69 121.80 142.79 1,021,662.46
6048+780.00 0.0000 17.1860 0.00 31.29 10.00 0.00 0.00 312.92 1,021,349.54
6048+800.00 0.0000 19.9790 0.00 37.17 10.00 0.00 0.00 371.65 1,020,977.89
6048+820.00 0.0000 13.3320 0.00 33.31 10.00 0.00 0.00 333.11 1,020,644.78
6048+840.00 0.0000 18.0880 0.00 31.42 10.00 0.00 0.00 314.20 1,020,330.58
286
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6048+860.00 0.0000 9.6620 0.00 27.75 10.00 0.00 0.00 277.50 1,020,053.08
6048+880.00 0.0000 13.6040 0.00 23.27 10.00 0.00 0.00 232.66 1,019,820.42
6048+900.00 0.0000 16.3550 0.00 29.96 10.00 0.00 0.00 299.59 1,019,520.83
6048+920.00 0.0000 12.8570 0.00 29.21 10.00 0.00 0.00 292.12 1,019,228.71
6048+940.00 0.8310 10.0430 0.83 22.90 10.00 8.31 10.80 229.00 1,019,010.51
6048+960.00 0.0000 24.6720 0.83 34.72 10.00 8.31 10.80 347.15 1,018,674.16
6048+980.00 0.0000 30.2510 0.00 54.92 10.00 0.00 0.00 549.23 1,018,124.93
6049+000.00 0.0000 23.1660 0.00 53.42 10.00 0.00 0.00 534.17 1,017,590.76
6049+020.00 0.0000 27.3920 0.00 50.56 10.00 0.00 0.00 505.58 1,017,085.18
6049+040.00 0.0000 25.0380 0.00 52.43 10.00 0.00 0.00 524.30 1,016,560.88
6049+060.00 0.0000 27.1880 0.00 52.23 10.00 0.00 0.00 522.26 1,016,038.62
6049+080.00 0.0000 25.7670 0.00 52.96 10.00 0.00 0.00 529.55 1,015,509.07
6049+100.00 2.2420 3.4400 2.24 29.21 10.00 22.42 29.15 292.07 1,015,246.15
6049+120.00 0.0000 21.2240 2.24 24.66 10.00 22.42 29.15 246.64 1,015,028.65
6049+140.00 0.0000 26.5050 0.00 47.73 10.00 0.00 0.00 477.29 1,014,551.36
6049+160.00 0.0000 28.4640 0.00 54.97 10.00 0.00 0.00 549.69 1,014,001.67
6049+180.00 0.0000 25.7080 0.00 54.17 10.00 0.00 0.00 541.72 1,013,459.95
6049+200.00 0.0000 30.9620 0.00 56.67 10.00 0.00 0.00 566.70 1,012,893.25
6049+220.00 1.6180 6.9810 1.62 37.94 10.00 16.18 21.03 379.43 1,012,534.86
6049+240.00 0.0000 25.6800 1.62 32.66 10.00 16.18 21.03 326.61 1,012,229.28
6049+260.00 0.0000 40.1560 0.00 65.84 10.00 0.00 0.00 658.36 1,011,570.92
6049+280.00 0.0000 37.5420 0.00 77.70 10.00 0.00 0.00 776.98 1,010,793.94
6049+300.00 0.0000 35.8150 0.00 73.36 10.00 0.00 0.00 733.57 1,010,060.37
6049+320.00 0.0000 36.8200 0.00 72.64 10.00 0.00 0.00 726.35 1,009,334.02
6049+340.00 0.0000 28.1250 0.00 64.95 10.00 0.00 0.00 649.45 1,008,684.57
6049+360.00 0.0000 45.3150 0.00 73.44 10.00 0.00 0.00 734.40 1,007,950.17
6049+380.00 0.0000 42.1820 0.00 87.50 10.00 0.00 0.00 874.97 1,007,075.20
6049+400.00 0.0000 43.9940 0.00 86.18 10.00 0.00 0.00 861.76 1,006,213.44
6049+420.00 0.0000 50.1440 0.00 94.14 10.00 0.00 0.00 941.38 1,005,272.06
6049+440.00 0.0000 55.0860 0.00 105.23 10.00 0.00 0.00 1,052.30 1,004,219.76
6049+460.00 0.0000 54.6950 0.00 109.78 10.00 0.00 0.00 1,097.81 1,003,121.95
6049+480.00 0.0000 47.7450 0.00 102.44 10.00 0.00 0.00 1,024.40 1,002,097.55
6049+500.00 0.0000 44.8620 0.00 92.61 10.00 0.00 0.00 926.07 1,001,171.48
6049+520.00 0.0000 51.1820 0.00 96.04 10.00 0.00 0.00 960.44 1,000,211.04
6049+540.00 0.0000 49.2290 0.00 100.41 10.00 0.00 0.00 1,004.11 999,206.93
6049+560.00 0.0000 47.8160 0.00 97.05 10.00 0.00 0.00 970.45 998,236.48
6049+580.00 0.0000 50.7240 0.00 98.54 10.00 0.00 0.00 985.40 997,251.08
6049+600.00 0.0000 51.0290 0.00 101.75 10.00 0.00 0.00 1,017.53 996,233.55
6049+620.00 0.0000 46.6820 0.00 97.71 10.00 0.00 0.00 977.11 995,256.44
6049+640.00 0.0000 38.7320 0.00 85.41 10.00 0.00 0.00 854.14 994,402.30
6049+660.00 0.0000 39.9420 0.00 78.67 10.00 0.00 0.00 786.74 993,615.56
6049+680.00 0.0000 41.6070 0.00 81.55 10.00 0.00 0.00 815.49 992,800.07
6049+700.00 0.0000 36.3230 0.00 77.93 10.00 0.00 0.00 779.30 992,020.77
6049+720.00 0.0000 40.3470 0.00 76.67 10.00 0.00 0.00 766.70 991,254.07
6049+740.00 0.0000 43.9100 0.00 84.26 10.00 0.00 0.00 842.57 990,411.50
287
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6049+760.00 0.0000 38.6910 0.00 82.60 10.00 0.00 0.00 826.01 989,585.49
6049+780.00 0.0000 40.8000 0.00 79.49 10.00 0.00 0.00 794.91 988,790.58
6049+800.00 0.0000 42.3220 0.00 83.12 10.00 0.00 0.00 831.22 987,959.36
6049+820.00 0.0000 39.9670 0.00 82.29 10.00 0.00 0.00 822.89 987,136.47
6049+840.00 0.0000 22.8600 0.00 62.83 10.00 0.00 0.00 628.27 986,508.20
6049+860.00 2.5240 10.2870 2.52 33.15 10.00 25.24 32.81 331.47 986,209.54
6049+880.00 2.9730 9.0640 5.50 19.35 10.00 54.97 71.46 193.51 986,087.49
6049+900.00 1.2930 3.4250 4.27 12.49 10.00 42.66 55.46 124.89 986,018.06
6049+920.00 0.5810 6.4840 1.87 9.91 10.00 18.74 24.36 99.09 985,943.33
6049+940.00 0.0000 15.5490 0.58 22.03 10.00 5.81 7.55 220.33 985,730.56
6049+960.00 0.0000 34.6550 0.00 50.20 10.00 0.00 0.00 502.04 985,228.52
6049+980.00 0.0000 33.8550 0.00 68.51 10.00 0.00 0.00 685.10 984,543.42
6050+000.00 0.0000 24.1990 0.00 58.05 10.00 0.00 0.00 580.54 983,962.88
6050+020.00 1.1900 18.4220 1.19 42.62 10.00 11.90 15.47 426.21 983,552.14
6050+040.00 0.0000 31.2940 1.19 49.72 10.00 11.90 15.47 497.16 983,070.45
6050+060.00 0.0000 33.4740 0.00 64.77 10.00 0.00 0.00 647.68 982,422.77
6050+080.00 0.0000 35.0460 0.00 68.52 10.00 0.00 0.00 685.20 981,737.57
6050+100.00 0.0000 32.7210 0.00 67.77 10.00 0.00 0.00 677.67 981,059.90
6050+120.00 0.0000 33.9470 0.00 66.67 10.00 0.00 0.00 666.68 980,393.22
6050+140.00 0.0000 27.4340 0.00 61.38 10.00 0.00 0.00 613.81 979,779.41
6050+160.00 0.0000 20.7420 0.00 48.18 10.00 0.00 0.00 481.76 979,297.65
6050+180.00 0.0000 22.3800 0.00 43.12 10.00 0.00 0.00 431.22 978,866.43
6050+200.00 0.0000 31.7230 0.00 54.10 10.00 0.00 0.00 541.03 978,325.40
6050+220.00 0.0000 31.2850 0.00 63.01 10.00 0.00 0.00 630.08 977,695.32
6050+240.00 0.0000 34.8770 0.00 66.16 10.00 0.00 0.00 661.62 977,033.70
6050+260.00 0.0000 35.9350 0.00 70.81 10.00 0.00 0.00 708.12 976,325.58
6050+280.00 0.0000 37.8380 0.00 73.77 10.00 0.00 0.00 737.73 975,587.85
6050+300.00 0.0000 37.9020 0.00 75.74 10.00 0.00 0.00 757.40 974,830.45
6050+320.00 0.0000 33.2080 0.00 71.11 10.00 0.00 0.00 711.10 974,119.35
6050+340.00 0.0000 33.2580 0.00 66.47 10.00 0.00 0.00 664.66 973,454.69
6050+360.00 0.0000 29.2190 0.00 62.48 10.00 0.00 0.00 624.77 972,829.92
6050+380.00 0.0000 28.2910 0.00 57.51 10.00 0.00 0.00 575.10 972,254.82
6050+400.00 0.0000 24.4950 0.00 52.79 10.00 0.00 0.00 527.86 971,726.96
6050+420.00 0.0000 29.0930 0.00 53.59 10.00 0.00 0.00 535.88 971,191.08
6050+440.00 0.0000 32.1600 0.00 61.25 10.00 0.00 0.00 612.53 970,578.55
6050+460.00 0.0000 25.2960 0.00 57.46 10.00 0.00 0.00 574.56 970,003.99
6050+480.00 0.0000 17.0110 0.00 42.31 10.00 0.00 0.00 423.07 969,580.92
6050+500.00 0.0000 23.3700 0.00 40.38 10.00 0.00 0.00 403.81 969,177.11
6050+520.00 0.0000 22.6630 0.00 46.03 10.00 0.00 0.00 460.33 968,716.78
6050+540.00 0.0000 20.8480 0.00 43.51 10.00 0.00 0.00 435.11 968,281.67
6050+560.00 0.0000 17.0130 0.00 37.86 10.00 0.00 0.00 378.61 967,903.06
6050+580.00 0.0000 22.5790 0.00 39.59 10.00 0.00 0.00 395.92 967,507.14
6050+600.00 0.0000 15.3270 0.00 37.91 10.00 0.00 0.00 379.06 967,128.08
6050+620.00 0.4110 10.7730 0.41 26.10 10.00 4.11 5.34 261.00 966,872.42
6050+640.00 0.5680 7.3450 0.98 18.12 10.00 9.79 12.73 181.18 966,703.97
288
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6050+660.00 1.7290 2.9380 2.30 10.28 10.00 22.97 29.86 102.83 966,631.00
6050+680.00 0.0000 15.6160 1.73 18.55 10.00 17.29 22.48 185.54 966,467.94
6050+700.00 0.0000 14.6230 0.00 30.24 10.00 0.00 0.00 302.39 966,165.55
6050+720.00 1.3150 6.3480 1.32 20.97 10.00 13.15 17.10 209.71 965,972.93
6050+740.00 2.2910 4.2230 3.61 10.57 10.00 36.06 46.88 105.71 965,914.10
6050+760.00 0.0000 16.4750 2.29 20.70 10.00 22.91 29.78 206.98 965,736.90
6050+780.00 0.0000 24.2460 0.00 40.72 10.00 0.00 0.00 407.21 965,329.69
6050+800.00 0.0000 22.2670 0.00 46.51 10.00 0.00 0.00 465.13 964,864.56
6050+820.00 0.7200 8.1620 0.72 30.43 10.00 7.20 9.36 304.29 964,569.63
6050+840.00 0.0000 13.7400 0.72 21.90 10.00 7.20 9.36 219.02 964,359.97
6050+860.00 0.0000 10.9340 0.00 24.67 10.00 0.00 0.00 246.74 964,113.23
6050+880.00 0.0000 23.5500 0.00 34.48 10.00 0.00 0.00 344.84 963,768.39
6050+900.00 0.4170 4.6990 0.42 28.25 10.00 4.17 5.42 282.49 963,491.32
6050+920.00 0.0000 20.4160 0.42 25.12 10.00 4.17 5.42 251.15 963,245.59
6050+940.00 0.0000 26.8080 0.00 47.22 10.00 0.00 0.00 472.24 962,773.35
6050+960.00 0.0000 29.9030 0.00 56.71 10.00 0.00 0.00 567.11 962,206.24
6050+980.00 0.0000 36.1360 0.00 66.04 10.00 0.00 0.00 660.39 961,545.85
6051+000.00 0.0000 36.9170 0.00 73.05 10.00 0.00 0.00 730.53 960,815.32
6051+020.00 0.0000 34.3310 0.00 71.25 10.00 0.00 0.00 712.48 960,102.84
6051+040.00 0.0000 29.8570 0.00 64.19 10.00 0.00 0.00 641.88 959,460.96
6051+060.00 0.0000 9.7340 0.00 39.59 10.00 0.00 0.00 395.91 959,065.05
6051+080.00 0.0000 28.7250 0.00 38.46 10.00 0.00 0.00 384.59 958,680.46
6051+100.00 0.0000 34.2400 0.00 62.97 10.00 0.00 0.00 629.65 958,050.81
6051+120.00 0.0000 38.4330 0.00 72.67 10.00 0.00 0.00 726.73 957,324.08
6051+140.00 0.0000 39.8740 0.00 78.31 10.00 0.00 0.00 783.07 956,541.01
6051+160.00 0.0000 37.7140 0.00 77.59 10.00 0.00 0.00 775.88 955,765.13
6051+180.00 0.0000 35.3880 0.00 73.10 10.00 0.00 0.00 731.02 955,034.11
6051+200.00 0.0000 36.4060 0.00 71.79 10.00 0.00 0.00 717.94 954,316.17
6051+220.00 0.0000 38.0240 0.00 74.43 10.00 0.00 0.00 744.30 953,571.87
6051+240.00 0.0000 38.0970 0.00 76.12 10.00 0.00 0.00 761.21 952,810.66
6051+260.00 0.0000 39.5980 0.00 77.70 10.00 0.00 0.00 776.95 952,033.71
6051+280.00 0.0000 32.1790 0.00 71.78 10.00 0.00 0.00 717.77 951,315.94
6051+300.00 0.0000 19.6840 0.00 51.86 10.00 0.00 0.00 518.63 950,797.31
6051+320.00 6.8510 0.2810 6.85 19.97 10.00 68.51 89.06 199.65 950,686.73
6051+340.00 15.4340 0.1520 22.29 0.43 10.00 222.85 289.71 4.33 950,972.10
6051+360.00 4.5120 2.1160 19.95 2.27 10.00 199.46 259.30 22.68 951,208.72
6051+380.00 0.7650 4.8510 5.28 6.97 10.00 52.77 68.60 69.67 951,207.65
6051+400.00 0.0000 10.0340 0.77 14.89 10.00 7.65 9.95 148.85 951,068.75
6051+420.00 0.0000 9.9220 0.00 19.96 10.00 0.00 0.00 199.56 950,869.19
6051+440.00 0.0000 25.7700 0.00 35.69 10.00 0.00 0.00 356.92 950,512.27
6051+460.00 0.0000 14.0990 0.00 39.87 10.00 0.00 0.00 398.69 950,113.58
6051+480.00 1.3310 6.5150 1.33 20.61 10.00 13.31 17.30 206.14 949,924.74
6051+500.00 0.3740 9.1990 1.71 15.71 10.00 17.05 22.17 157.14 949,789.76
6051+520.00 0.0000 18.4270 0.37 27.63 10.00 3.74 4.86 276.26 949,518.37
6051+540.00 0.0000 16.3470 0.00 34.77 10.00 0.00 0.00 347.74 949,170.63
289
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6051+560.00 0.5750 13.6190 0.58 29.97 10.00 5.75 7.48 299.66 948,878.44
6051+580.00 0.0000 24.7930 0.58 38.41 10.00 5.75 7.48 384.12 948,501.80
6051+600.00 0.0000 27.4490 0.00 52.24 10.00 0.00 0.00 522.42 947,979.38
6051+620.00 0.0000 25.5520 0.00 53.00 10.00 0.00 0.00 530.01 947,449.37
6051+640.00 0.5610 4.9650 0.56 30.52 10.00 5.61 7.29 305.17 947,151.49
6051+660.00 0.4800 15.0610 1.04 20.03 10.00 10.41 13.53 200.26 946,964.76
6051+680.00 0.0000 29.6050 0.48 44.67 10.00 4.80 6.24 446.66 946,524.34
6051+700.00 0.0000 26.8070 0.00 56.41 10.00 0.00 0.00 564.12 945,960.22
6051+720.00 0.0000 24.7390 0.00 51.55 10.00 0.00 0.00 515.46 945,444.76
6051+740.00 0.0000 34.8950 0.00 59.63 10.00 0.00 0.00 596.34 944,848.42
6051+760.00 0.0000 29.1720 0.00 64.07 10.00 0.00 0.00 640.67 944,207.75
6051+780.00 0.0000 38.8430 0.00 68.02 10.00 0.00 0.00 680.15 943,527.60
6051+800.00 0.0000 28.5320 0.00 67.38 10.00 0.00 0.00 673.75 942,853.85
6051+820.00 0.0000 27.2610 0.00 55.79 10.00 0.00 0.00 557.93 942,295.92
6051+840.00 0.0000 27.2550 0.00 54.52 10.00 0.00 0.00 545.16 941,750.76
6051+860.00 0.0000 33.4010 0.00 60.66 10.00 0.00 0.00 606.56 941,144.20
6051+880.00 0.0000 28.1060 0.00 61.51 10.00 0.00 0.00 615.07 940,529.13
6051+900.00 0.0000 22.9860 0.00 51.09 10.00 0.00 0.00 510.92 940,018.21
6051+920.00 0.0000 34.7420 0.00 57.73 10.00 0.00 0.00 577.28 939,440.93
6051+940.00 0.0000 33.7870 0.00 68.53 10.00 0.00 0.00 685.29 938,755.64
6051+960.00 0.0000 40.9460 0.00 74.73 10.00 0.00 0.00 747.33 938,008.31
6051+980.00 0.0000 41.8860 0.00 82.83 10.00 0.00 0.00 828.32 937,179.99
6052+000.00 0.0000 36.0140 0.00 77.90 10.00 0.00 0.00 779.00 936,400.99
6052+020.00 0.0000 34.6890 0.00 70.70 10.00 0.00 0.00 707.03 935,693.96
6052+040.00 0.0000 28.9140 0.00 63.60 10.00 0.00 0.00 636.03 935,057.93
6052+060.00 0.0000 45.5660 0.00 74.48 10.00 0.00 0.00 744.80 934,313.13
6052+080.00 0.0000 39.2210 0.00 84.79 10.00 0.00 0.00 847.87 933,465.26
6052+100.00 0.0000 13.0760 0.00 52.30 10.00 0.00 0.00 522.97 932,942.29
6052+120.00 0.0000 32.3500 0.00 45.43 10.00 0.00 0.00 454.26 932,488.03
6052+140.00 0.0000 40.2110 0.00 72.56 10.00 0.00 0.00 725.61 931,762.42
6052+160.00 0.0000 47.7820 0.00 87.99 10.00 0.00 0.00 879.93 930,882.49
6052+180.00 0.0000 50.0670 0.00 97.85 10.00 0.00 0.00 978.49 929,904.00
6052+200.00 0.0000 50.1450 0.00 100.21 10.00 0.00 0.00 1,002.12 928,901.88
6052+220.00 0.0000 49.7850 0.00 99.93 10.00 0.00 0.00 999.30 927,902.58
6052+240.00 0.0000 39.7880 0.00 89.57 10.00 0.00 0.00 895.73 927,006.85
6052+260.00 0.0000 35.9200 0.00 75.71 10.00 0.00 0.00 757.08 926,249.77
6052+280.00 0.0000 43.6720 0.00 79.59 10.00 0.00 0.00 795.92 925,453.85
6052+300.00 0.0000 41.6180 0.00 85.29 10.00 0.00 0.00 852.90 924,600.95
6052+320.00 0.0000 37.6700 0.00 79.29 10.00 0.00 0.00 792.88 923,808.07
6052+340.00 0.0000 39.9610 0.00 77.63 10.00 0.00 0.00 776.31 923,031.76
6052+360.00 0.0000 48.0230 0.00 87.98 10.00 0.00 0.00 879.84 922,151.92
6052+380.00 0.0000 45.3420 0.00 93.37 10.00 0.00 0.00 933.65 921,218.27
6052+400.00 0.0000 19.6040 0.00 64.95 10.00 0.00 0.00 649.46 920,568.81
6052+420.00 0.0000 31.6700 0.00 51.27 10.00 0.00 0.00 512.74 920,056.07
6052+420.00 0.0000 39.4620 0.00 71.13 0.00 0.00 0.00 0.00 920,056.07
290
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6052+440.00 0.0000 35.5970 0.00 75.06 10.00 0.00 0.00 750.59 919,305.48
6052+460.00 0.0000 34.3200 0.00 69.92 10.00 0.00 0.00 699.17 918,606.31
6052+480.00 0.0000 45.4020 0.00 79.72 10.00 0.00 0.00 797.22 917,809.09
6052+490.00 0.0000 44.2000 0.00 89.60 5.00 0.00 0.00 448.01 917,361.08
6052+490.00 0.0000 36.8680 0.00 81.07 0.00 0.00 0.00 0.00 917,361.08
6052+500.00 0.0000 36.3580 0.00 73.23 5.00 0.00 0.00 366.13 916,994.95
6052+520.00 0.0000 43.8920 0.00 80.25 10.00 0.00 0.00 802.50 916,192.45
6052+540.00 0.0000 35.1850 0.00 79.08 10.00 0.00 0.00 790.77 915,401.68
6052+560.00 0.0000 33.5420 0.00 68.73 10.00 0.00 0.00 687.27 914,714.41
6052+580.00 0.0000 25.0910 0.00 58.63 10.00 0.00 0.00 586.33 914,128.08
6052+600.00 0.0000 29.7800 0.00 54.87 10.00 0.00 0.00 548.71 913,579.37
6052+620.00 0.0000 40.3130 0.00 70.09 10.00 0.00 0.00 700.93 912,878.44
6052+640.00 0.0000 37.7070 0.00 78.02 10.00 0.00 0.00 780.20 912,098.24
6052+660.00 0.0000 53.8810 0.00 91.59 10.00 0.00 0.00 915.88 911,182.36
6052+680.00 0.0000 53.0250 0.00 106.91 10.00 0.00 0.00 1,069.06 910,113.30
6052+700.00 0.0000 44.2110 0.00 97.24 10.00 0.00 0.00 972.36 909,140.94
6052+720.00 0.0000 44.3810 0.00 88.59 10.00 0.00 0.00 885.92 908,255.02
6052+740.00 0.0000 37.6730 0.00 82.05 10.00 0.00 0.00 820.54 907,434.48
6052+760.00 0.0000 34.7150 0.00 72.39 10.00 0.00 0.00 723.88 906,710.60
6052+780.00 0.0000 12.5660 0.00 47.28 10.00 0.00 0.00 472.81 906,237.79
6052+800.00 0.0000 16.2320 0.00 28.80 10.00 0.00 0.00 287.98 905,949.81
6052+820.00 0.0000 25.9910 0.00 42.22 10.00 0.00 0.00 422.23 905,527.58
6052+840.00 0.0000 17.1860 0.00 43.18 10.00 0.00 0.00 431.77 905,095.81
6052+860.00 0.0000 33.1540 0.00 50.34 10.00 0.00 0.00 503.40 904,592.41
6052+880.00 0.0000 28.6770 0.00 61.83 10.00 0.00 0.00 618.31 903,974.10
6052+900.00 0.0000 38.7820 0.00 67.46 10.00 0.00 0.00 674.59 903,299.51
6052+920.00 0.0000 21.7490 0.00 60.53 10.00 0.00 0.00 605.31 902,694.20
6052+940.00 0.0000 46.2050 0.00 67.95 10.00 0.00 0.00 679.54 902,014.66
6052+960.00 0.0000 44.4020 0.00 90.61 10.00 0.00 0.00 906.07 901,108.59
6052+980.00 0.0000 38.4410 0.00 82.84 10.00 0.00 0.00 828.43 900,280.16
6053+000.00 0.0000 40.9710 0.00 79.41 10.00 0.00 0.00 794.12 899,486.04
6053+020.00 0.0000 28.9730 0.00 69.94 10.00 0.00 0.00 699.44 898,786.60
6053+040.00 0.0000 30.3190 0.00 59.29 10.00 0.00 0.00 592.92 898,193.68
6053+060.00 0.0000 22.1860 0.00 52.51 10.00 0.00 0.00 525.05 897,668.63
6053+080.00 0.9170 10.8790 0.92 33.07 10.00 9.17 11.92 330.65 897,349.90
6053+100.00 0.0000 26.0190 0.92 36.90 10.00 9.17 11.92 368.98 896,992.84
6053+120.00 0.0000 25.0050 0.00 51.02 10.00 0.00 0.00 510.24 896,482.60
6053+140.00 0.0000 23.7210 0.00 48.73 10.00 0.00 0.00 487.26 895,995.34
6053+160.00 0.0000 31.0890 0.00 54.81 10.00 0.00 0.00 548.10 895,447.24
6053+180.00 0.0000 14.1680 0.00 45.26 10.00 0.00 0.00 452.57 894,994.67
6053+200.00 0.0000 12.3910 0.00 26.56 10.00 0.00 0.00 265.59 894,729.08
6053+220.00 0.0000 24.1100 0.00 36.50 10.00 0.00 0.00 365.01 894,364.07
6053+240.00 0.0000 36.7440 0.00 60.85 10.00 0.00 0.00 608.54 893,755.53
6053+260.00 0.0000 37.0740 0.00 73.82 10.00 0.00 0.00 738.18 893,017.35
6053+280.00 0.0000 31.6800 0.00 68.75 10.00 0.00 0.00 687.54 892,329.81
291
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6053+300.00 0.0000 33.2920 0.00 64.97 10.00 0.00 0.00 649.72 891,680.09
6053+320.00 0.0000 23.6030 0.00 56.90 10.00 0.00 0.00 568.95 891,111.14
6053+340.00 8.7520 0.1690 8.75 23.77 10.00 87.52 113.78 237.72 890,987.20
6053+360.00 0.0000 23.2210 8.75 23.39 10.00 87.52 113.78 233.90 890,867.08
6053+380.00 0.0000 34.0740 0.00 57.30 10.00 0.00 0.00 572.95 890,294.13
6053+400.00 0.0000 23.8800 0.00 57.95 10.00 0.00 0.00 579.54 889,714.59
6053+420.00 0.0000 22.1160 0.00 46.00 10.00 0.00 0.00 459.96 889,254.63
6053+440.00 0.0000 39.8910 0.00 62.01 10.00 0.00 0.00 620.07 888,634.56
6053+460.00 0.0000 29.5030 0.00 69.39 10.00 0.00 0.00 693.94 887,940.62
6053+480.00 0.0000 38.6760 0.00 68.18 10.00 0.00 0.00 681.79 887,258.83
6053+500.00 0.0000 36.4780 0.00 75.15 10.00 0.00 0.00 751.54 886,507.29
6053+520.00 0.0000 24.4630 0.00 60.94 10.00 0.00 0.00 609.41 885,897.88
6053+540.00 0.0000 44.1240 0.00 68.59 10.00 0.00 0.00 685.87 885,212.01
6053+560.00 0.0000 42.7980 0.00 86.92 10.00 0.00 0.00 869.22 884,342.79
6053+580.00 0.0000 51.6540 0.00 94.45 10.00 0.00 0.00 944.52 883,398.27
6053+600.00 0.0000 48.3730 0.00 100.03 10.00 0.00 0.00 1,000.27 882,398.00
6053+620.00 0.0000 43.0470 0.00 91.42 10.00 0.00 0.00 914.20 881,483.80
6053+640.00 0.0000 17.4280 0.00 60.48 10.00 0.00 0.00 604.75 880,879.05
6053+660.00 0.0000 15.8380 0.00 33.27 10.00 0.00 0.00 332.66 880,546.39
6053+680.00 0.0000 46.0490 0.00 61.89 10.00 0.00 0.00 618.87 879,927.52
6053+700.00 0.0000 42.8620 0.00 88.91 10.00 0.00 0.00 889.11 879,038.41
6053+720.00 0.0000 39.9190 0.00 82.78 10.00 0.00 0.00 827.81 878,210.60
6053+740.00 0.0000 47.2160 0.00 87.14 10.00 0.00 0.00 871.35 877,339.25
6053+760.00 0.0000 38.8010 0.00 86.02 10.00 0.00 0.00 860.17 876,479.08
6053+780.00 0.0000 35.5070 0.00 74.31 10.00 0.00 0.00 743.08 875,736.00
6053+800.00 0.0000 34.2520 0.00 69.76 10.00 0.00 0.00 697.59 875,038.41
6053+820.00 0.0000 39.0380 0.00 73.29 10.00 0.00 0.00 732.90 874,305.51
6053+840.00 0.0000 48.2310 0.00 87.27 10.00 0.00 0.00 872.69 873,432.82
6053+860.00 0.0000 56.7460 0.00 104.98 10.00 0.00 0.00 1,049.77 872,383.05
6053+880.00 0.0000 56.9990 0.00 113.75 10.00 0.00 0.00 1,137.45 871,245.60
6053+900.00 0.0000 55.7500 0.00 112.75 10.00 0.00 0.00 1,127.49 870,118.11
6053+920.00 0.0000 50.6930 0.00 106.44 10.00 0.00 0.00 1,064.43 869,053.68
6053+940.00 0.0000 33.8310 0.00 84.52 10.00 0.00 0.00 845.24 868,208.44
6053+960.00 0.0000 38.8880 0.00 72.72 10.00 0.00 0.00 727.19 867,481.25
6053+980.00 0.0000 39.9770 0.00 78.87 10.00 0.00 0.00 788.65 866,692.60
6054+000.00 0.0000 43.7480 0.00 83.73 10.00 0.00 0.00 837.25 865,855.35
6054+020.00 0.0000 42.1780 0.00 85.93 10.00 0.00 0.00 859.26 864,996.09
6054+040.00 0.0000 40.8570 0.00 83.04 10.00 0.00 0.00 830.35 864,165.74
6054+060.00 0.0000 21.7930 0.00 62.65 10.00 0.00 0.00 626.50 863,539.24
6054+080.00 0.0000 28.5040 0.00 50.30 10.00 0.00 0.00 502.97 863,036.27
6054+100.00 0.0000 28.6710 0.00 57.18 10.00 0.00 0.00 571.75 862,464.52
6054+120.00 0.0000 25.8560 0.00 54.53 10.00 0.00 0.00 545.27 861,919.25
6054+140.00 0.0000 19.5110 0.00 45.37 10.00 0.00 0.00 453.67 861,465.58
6054+160.00 0.0000 27.7400 0.00 47.25 10.00 0.00 0.00 472.51 860,993.07
6054+180.00 0.0000 17.2770 0.00 45.02 10.00 0.00 0.00 450.17 860,542.90
292
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6054+200.00 0.0000 13.6110 0.00 30.89 10.00 0.00 0.00 308.88 860,234.02
6054+220.00 0.0000 26.2700 0.00 39.88 10.00 0.00 0.00 398.81 859,835.21
6054+240.00 0.0000 18.7420 0.00 45.01 10.00 0.00 0.00 450.12 859,385.09
6054+260.00 0.0000 24.8340 0.00 43.58 10.00 0.00 0.00 435.76 858,949.33
6054+280.00 0.0000 24.9660 0.00 49.80 10.00 0.00 0.00 498.00 858,451.33
6054+300.00 0.0000 29.7870 0.00 54.75 10.00 0.00 0.00 547.53 857,903.80
6054+320.00 0.0000 29.7960 0.00 59.58 10.00 0.00 0.00 595.83 857,307.97
6054+340.00 0.5840 19.2290 0.58 49.03 10.00 5.84 7.59 490.25 856,825.31
6054+360.00 0.0000 23.8270 0.58 43.06 10.00 5.84 7.59 430.56 856,402.34
6054+380.00 0.0000 21.3830 0.00 45.21 10.00 0.00 0.00 452.10 855,950.24
6054+400.00 0.0000 18.3640 0.00 39.75 10.00 0.00 0.00 397.47 855,552.77
6054+420.00 0.0000 17.5960 0.00 35.96 10.00 0.00 0.00 359.60 855,193.17
6054+440.00 0.7880 7.5590 0.79 25.16 10.00 7.88 10.24 251.55 854,951.86
6054+460.00 1.4340 6.7370 2.22 14.30 10.00 22.22 28.89 142.96 854,837.79
6054+480.00 5.7780 0.2400 7.21 6.98 10.00 72.12 93.76 69.77 854,861.78
6054+500.00 3.4670 1.4810 9.25 1.72 10.00 92.45 120.19 17.21 854,964.75
6054+520.00 0.0000 16.7030 3.47 18.18 10.00 34.67 45.07 181.84 854,827.98
6054+540.00 0.7710 9.5710 0.77 26.27 10.00 7.71 10.02 262.74 854,575.26
6054+560.00 0.0000 20.3910 0.77 29.96 10.00 7.71 10.02 299.62 854,285.67
6054+580.00 0.0000 22.3090 0.00 42.70 10.00 0.00 0.00 427.00 853,858.67
6054+600.00 0.0000 21.4800 0.00 43.79 10.00 0.00 0.00 437.89 853,420.78
6054+620.00 0.0000 9.7800 0.00 31.26 10.00 0.00 0.00 312.60 853,108.18
6054+640.00 0.0000 15.9160 0.00 25.70 10.00 0.00 0.00 256.96 852,851.22
6054+660.00 0.7820 5.8930 0.78 21.81 10.00 7.82 10.17 218.09 852,643.29
6054+680.00 0.0000 10.3970 0.78 16.29 10.00 7.82 10.17 162.90 852,490.56
6054+700.00 0.0000 13.0450 0.00 23.44 10.00 0.00 0.00 234.42 852,256.14
6054+720.00 0.0000 11.2890 0.00 24.33 10.00 0.00 0.00 243.34 852,012.80
6054+740.00 0.0000 19.6740 0.00 30.96 10.00 0.00 0.00 309.63 851,703.17
6054+760.00 0.3820 13.6480 0.38 33.32 10.00 3.82 4.97 333.22 851,374.92
6054+780.00 0.0000 18.6470 0.38 32.30 10.00 3.82 4.97 322.95 851,056.93
6054+800.00 0.0000 30.4930 0.00 49.14 10.00 0.00 0.00 491.40 850,565.53
6054+820.00 0.0000 33.2170 0.00 63.71 10.00 0.00 0.00 637.10 849,928.43
6054+840.00 0.0000 31.2350 0.00 64.45 10.00 0.00 0.00 644.52 849,283.91
6054+860.00 0.0000 14.0710 0.00 45.31 10.00 0.00 0.00 453.06 848,830.85
6054+880.00 0.0000 42.3040 0.00 56.38 10.00 0.00 0.00 563.75 848,267.10
6054+900.00 0.0000 46.8180 0.00 89.12 10.00 0.00 0.00 891.22 847,375.88
6054+920.00 0.0000 29.0810 0.00 75.90 10.00 0.00 0.00 758.99 846,616.89
6054+940.00 0.0000 31.5580 0.00 60.64 10.00 0.00 0.00 606.39 846,010.50
6054+960.00 0.0000 38.9520 0.00 70.51 10.00 0.00 0.00 705.10 845,305.40
6054+980.00 0.0000 37.6530 0.00 76.61 10.00 0.00 0.00 766.05 844,539.35
6055+000.00 0.0000 46.2460 0.00 83.90 10.00 0.00 0.00 838.99 843,700.36
6055+020.00 0.0000 19.5590 0.00 65.81 10.00 0.00 0.00 658.05 843,042.31
6055+040.00 0.0000 6.7980 0.00 26.36 10.00 0.00 0.00 263.57 842,778.74
6055+060.00 0.0000 41.4120 0.00 48.21 10.00 0.00 0.00 482.10 842,296.64
6055+080.00 0.0000 53.8200 0.00 95.23 10.00 0.00 0.00 952.32 841,344.32
293
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6055+100.00 0.0000 55.0790 0.00 108.90 10.00 0.00 0.00 1,088.99 840,255.33
6055+120.00 0.0000 50.0290 0.00 105.11 10.00 0.00 0.00 1,051.08 839,204.25
6055+140.00 0.0000 28.3070 0.00 78.34 10.00 0.00 0.00 783.36 838,420.89
6055+160.00 0.0000 9.8500 0.00 38.16 10.00 0.00 0.00 381.57 838,039.32
6055+180.00 0.0000 37.3510 0.00 47.20 10.00 0.00 0.00 472.01 837,567.31
6055+200.00 0.0000 14.7770 0.00 52.13 10.00 0.00 0.00 521.28 837,046.03
6055+220.00 0.0000 20.1750 0.00 34.95 10.00 0.00 0.00 349.52 836,696.51
6055+240.00 0.0000 34.4440 0.00 54.62 10.00 0.00 0.00 546.19 836,150.32
6055+260.00 0.0000 16.7860 0.00 51.23 10.00 0.00 0.00 512.30 835,638.02
6055+280.00 0.0000 24.2560 0.00 41.04 10.00 0.00 0.00 410.42 835,227.60
6055+300.00 1.0540 14.5570 1.05 38.81 10.00 10.54 13.70 388.13 834,853.17
6055+320.00 0.0000 36.0550 1.05 50.61 10.00 10.54 13.70 506.12 834,360.76
6055+340.00 0.0000 32.3580 0.00 68.41 10.00 0.00 0.00 684.13 833,676.63
6055+360.00 0.0000 31.2380 0.00 63.60 10.00 0.00 0.00 635.96 833,040.67
6055+380.00 0.0000 18.2510 0.00 49.49 10.00 0.00 0.00 494.89 832,545.78
6055+400.00 0.0000 47.2250 0.00 65.48 10.00 0.00 0.00 654.76 831,891.02
6055+420.00 0.0000 45.3410 0.00 92.57 10.00 0.00 0.00 925.66 830,965.36
6055+440.00 0.0000 37.0670 0.00 82.41 10.00 0.00 0.00 824.08 830,141.28
6055+460.00 0.0000 46.5840 0.00 83.65 10.00 0.00 0.00 836.51 829,304.77
6055+480.00 0.0000 32.2710 0.00 78.86 10.00 0.00 0.00 788.55 828,516.22
6055+500.00 0.0000 34.6190 0.00 66.89 10.00 0.00 0.00 668.90 827,847.32
6055+520.00 0.0000 46.9470 0.00 81.57 10.00 0.00 0.00 815.66 827,031.66
6055+540.00 0.0000 33.6970 0.00 80.64 10.00 0.00 0.00 806.44 826,225.22
6055+560.00 0.0000 46.4180 0.00 80.12 10.00 0.00 0.00 801.15 825,424.07
6055+580.00 0.0000 49.8830 0.00 96.30 10.00 0.00 0.00 963.01 824,461.06
6055+600.00 0.0000 32.3210 0.00 82.20 10.00 0.00 0.00 822.04 823,639.02
6055+620.00 0.0000 11.5610 0.00 43.88 10.00 0.00 0.00 438.82 823,200.20
6055+640.00 0.0000 40.0730 0.00 51.63 10.00 0.00 0.00 516.34 822,683.86
6055+660.00 0.0000 44.7720 0.00 84.85 10.00 0.00 0.00 848.45 821,835.41
6055+680.00 0.0000 46.9030 0.00 91.68 10.00 0.00 0.00 916.75 820,918.66
6055+700.00 0.0000 50.7030 0.00 97.61 10.00 0.00 0.00 976.06 819,942.60
6055+720.00 0.0000 25.0790 0.00 75.78 10.00 0.00 0.00 757.82 819,184.78
6055+740.00 0.0000 5.8560 0.00 30.94 10.00 0.00 0.00 309.35 818,875.43
6055+760.00 0.0000 28.9480 0.00 34.80 10.00 0.00 0.00 348.04 818,527.39
6055+780.00 0.0000 35.9540 0.00 64.90 10.00 0.00 0.00 649.02 817,878.37
6055+800.00 0.0000 22.5950 0.00 58.55 10.00 0.00 0.00 585.49 817,292.88
6055+820.00 0.8600 15.6890 0.86 38.28 10.00 8.60 11.18 382.84 816,921.22
6055+840.00 0.0000 27.8040 0.86 43.49 10.00 8.60 11.18 434.93 816,497.47
6055+860.00 0.0000 37.4140 0.00 65.22 10.00 0.00 0.00 652.18 815,845.29
6055+880.00 0.0000 46.0040 0.00 83.42 10.00 0.00 0.00 834.18 815,011.11
6055+900.00 0.0000 53.0100 0.00 99.01 10.00 0.00 0.00 990.14 814,020.97
6055+920.00 0.0000 57.2980 0.00 110.31 10.00 0.00 0.00 1,103.08 812,917.89
6055+940.00 0.0000 31.3950 0.00 88.69 10.00 0.00 0.00 886.93 812,030.96
6055+960.00 0.0000 26.1070 0.00 57.50 10.00 0.00 0.00 575.02 811,455.94
6055+980.00 0.0000 29.9020 0.00 56.01 10.00 0.00 0.00 560.09 810,895.85
294
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6056+000.00 0.0000 36.2520 0.00 66.15 10.00 0.00 0.00 661.54 810,234.31
6056+020.00 0.0000 35.9950 0.00 72.25 10.00 0.00 0.00 722.47 809,511.84
6056+040.00 0.0000 24.2250 0.00 60.22 10.00 0.00 0.00 602.20 808,909.64
6056+060.00 0.0000 22.2010 0.00 46.43 10.00 0.00 0.00 464.26 808,445.38
6056+080.00 2.6120 12.2800 2.61 34.48 10.00 26.12 33.96 344.81 808,134.52
6056+100.00 0.0000 19.1500 2.61 31.43 10.00 26.12 33.96 314.30 807,854.18
6056+120.00 0.0000 30.6690 0.00 49.82 10.00 0.00 0.00 498.19 807,355.99
6056+140.00 0.0000 42.5600 0.00 73.23 10.00 0.00 0.00 732.29 806,623.70
6056+160.00 0.0000 50.9750 0.00 93.54 10.00 0.00 0.00 935.35 805,688.35
6056+170.00 0.0000 50.5730 0.00 101.55 5.00 0.00 0.00 507.74 805,180.61
6056+170.00 0.0000 47.1560 0.00 97.73 0.00 0.00 0.00 0.00 805,180.61
6056+180.00 0.0000 44.7130 0.00 91.87 5.00 0.00 0.00 459.35 804,721.26
6056+200.00 0.0000 46.6510 0.00 91.36 10.00 0.00 0.00 913.64 803,807.62
6056+220.00 0.0000 30.3240 0.00 76.98 10.00 0.00 0.00 769.75 803,037.87
6056+240.00 0.0000 18.4060 0.00 48.73 10.00 0.00 0.00 487.30 802,550.57
6056+260.00 0.0000 33.3560 0.00 51.76 10.00 0.00 0.00 517.62 802,032.95
6056+280.00 0.0000 27.0730 0.00 60.43 10.00 0.00 0.00 604.29 801,428.66
6056+300.00 0.0000 29.4210 0.00 56.49 10.00 0.00 0.00 564.94 800,863.72
6056+300.00 0.0000 27.4160 0.00 56.84 0.00 0.00 0.00 0.00 800,863.72
6056+320.00 0.0000 31.9730 0.00 59.39 10.00 0.00 0.00 593.89 800,269.83
6056+340.00 0.0000 28.0370 0.00 60.01 10.00 0.00 0.00 600.10 799,669.73
6056+360.00 0.0000 14.7440 0.00 42.78 10.00 0.00 0.00 427.81 799,241.92
6056+380.00 0.0000 23.8740 0.00 38.62 10.00 0.00 0.00 386.18 798,855.74
6056+400.00 0.0000 18.4080 0.00 42.28 10.00 0.00 0.00 422.82 798,432.92
6056+420.00 0.0000 25.8670 0.00 44.28 10.00 0.00 0.00 442.75 797,990.17
6056+440.00 0.0000 27.3210 0.00 53.19 10.00 0.00 0.00 531.88 797,458.29
6056+460.00 0.0000 27.2080 0.00 54.53 10.00 0.00 0.00 545.29 796,913.00
6056+480.00 0.0000 13.6700 0.00 40.88 10.00 0.00 0.00 408.78 796,504.22
6056+500.00 0.0000 19.0840 0.00 32.75 10.00 0.00 0.00 327.54 796,176.68
6056+520.00 0.0000 20.7120 0.00 39.80 10.00 0.00 0.00 397.96 795,778.72
6056+540.00 0.0000 15.4700 0.00 36.18 10.00 0.00 0.00 361.82 795,416.90
6056+560.00 0.0000 13.9900 0.00 29.46 10.00 0.00 0.00 294.60 795,122.30
6056+580.00 0.0000 23.4840 0.00 37.47 10.00 0.00 0.00 374.74 794,747.56
6056+600.00 0.0000 29.5000 0.00 52.98 10.00 0.00 0.00 529.84 794,217.72
6056+614.06 0.9210 18.7300 0.92 48.23 7.03 6.48 8.42 339.15 793,886.99
6056+620.00 1.0910 14.9080 2.01 33.64 2.97 5.97 7.76 99.84 793,794.91
6056+640.00 0.0000 32.9320 1.09 47.84 10.00 10.91 14.18 478.40 793,330.70
6056+644.06 0.0000 33.1660 0.00 66.10 2.03 0.00 0.00 134.31 793,196.39
6056+660.00 0.0000 24.3370 0.00 57.50 7.97 0.00 0.00 458.18 792,738.20
6056+680.00 0.0000 43.7080 0.00 68.05 10.00 0.00 0.00 680.45 792,057.75
6056+700.00 0.0000 46.4260 0.00 90.13 10.00 0.00 0.00 901.34 791,156.41
6056+720.00 0.0000 34.2990 0.00 80.73 10.00 0.00 0.00 807.25 790,349.16
6056+734.82 0.0000 29.2840 0.00 63.58 7.41 0.00 0.00 471.05 789,878.11
6056+740.00 0.0000 27.3080 0.00 56.59 2.59 0.00 0.00 146.66 789,731.45
6056+760.00 0.8840 4.2920 0.88 31.60 10.00 8.84 11.49 316.00 789,426.94
295
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6056+764.82 0.0000 6.0700 0.88 10.36 2.41 2.13 2.77 24.96 789,404.75
6056+770.00 0.0000 8.9470 0.00 15.02 2.59 0.00 0.00 38.92 789,365.84
6056+770.00 0.0000 7.1270 0.00 16.07 0.00 0.00 0.00 0.00 789,365.84
6056+780.00 0.0000 13.0870 0.00 20.21 5.00 0.00 0.00 101.07 789,264.77
6056+800.00 1.7590 8.5580 1.76 21.65 10.00 17.59 22.87 216.45 789,071.18
6056+820.00 4.2030 4.7780 5.96 13.34 10.00 59.62 77.51 133.36 789,015.33
6056+840.00 0.0000 28.9510 4.20 33.73 10.00 42.03 54.64 337.29 788,732.68
6056+860.00 0.0000 32.0800 0.00 61.03 10.00 0.00 0.00 610.31 788,122.37
6056+860.00 0.0000 36.3230 0.00 68.40 0.00 0.00 0.00 0.00 788,122.37
6056+880.00 0.0000 42.3030 0.00 78.63 10.00 0.00 0.00 786.26 787,336.11
6056+900.00 0.0000 39.4270 0.00 81.73 10.00 0.00 0.00 817.30 786,518.81
6056+920.00 0.0000 31.7830 0.00 71.21 10.00 0.00 0.00 712.10 785,806.71
6056+940.00 0.8460 10.6500 0.85 42.43 10.00 8.46 11.00 424.33 785,393.38
6056+960.00 1.2990 14.0270 2.15 24.68 10.00 21.45 27.89 246.77 785,174.49
6056+980.00 0.0000 31.4540 1.30 45.48 10.00 12.99 16.89 454.81 784,736.57
6057+000.00 0.0000 35.3910 0.00 66.85 10.00 0.00 0.00 668.45 784,068.12
6057+020.00 0.0000 35.7710 0.00 71.16 10.00 0.00 0.00 711.62 783,356.50
6057+040.00 0.0000 26.8210 0.00 62.59 10.00 0.00 0.00 625.92 782,730.58
6057+060.00 0.0000 27.6780 0.00 54.50 10.00 0.00 0.00 544.99 782,185.59
6057+080.00 0.0000 21.8840 0.00 49.56 10.00 0.00 0.00 495.62 781,689.97
6057+100.00 0.0000 21.2260 0.00 43.11 10.00 0.00 0.00 431.10 781,258.87
6057+120.00 0.0000 26.5000 0.00 47.73 10.00 0.00 0.00 477.26 780,781.61
6057+140.00 0.0000 25.5400 0.00 52.04 10.00 0.00 0.00 520.40 780,261.21
6057+160.00 0.0000 23.5180 0.00 49.06 10.00 0.00 0.00 490.58 779,770.63
6057+180.00 0.0000 31.4570 0.00 54.98 10.00 0.00 0.00 549.75 779,220.88
6057+200.00 0.0000 14.8490 0.00 46.31 10.00 0.00 0.00 463.06 778,757.82
6057+220.00 0.0000 26.8470 0.00 41.70 10.00 0.00 0.00 416.96 778,340.86
6057+240.00 0.0000 35.6570 0.00 62.50 10.00 0.00 0.00 625.04 777,715.82
6057+260.00 0.0000 21.0090 0.00 56.67 10.00 0.00 0.00 566.66 777,149.16
6057+270.00 0.0000 9.3390 0.00 30.35 5.00 0.00 0.00 151.74 776,997.42
6057+270.00 0.0000 7.5390 0.00 16.88 0.00 0.00 0.00 0.00 776,997.42
6057+280.00 0.0000 7.9880 0.00 15.53 5.00 0.00 0.00 77.64 776,919.78
6057+300.00 0.0000 28.3130 0.00 36.30 10.00 0.00 0.00 363.01 776,556.77
6057+320.00 0.0000 28.8430 0.00 57.16 10.00 0.00 0.00 571.56 775,985.21
6057+340.00 0.0000 17.7920 0.00 46.64 10.00 0.00 0.00 466.35 775,518.86
6057+340.00 0.0000 20.9540 0.00 38.75 0.00 0.00 0.00 0.00 775,518.86
6057+360.00 0.0000 15.6540 0.00 36.61 10.00 0.00 0.00 366.08 775,152.78
6057+380.00 2.9950 7.3080 3.00 22.96 10.00 29.95 38.94 229.62 774,962.10
6057+400.00 2.4960 9.7660 5.49 17.07 10.00 54.91 71.38 170.74 774,862.74
6057+420.00 3.9680 0.1380 6.46 9.90 10.00 64.64 84.03 99.04 774,847.73
6057+440.00 10.6690 0.1310 14.64 0.27 10.00 146.37 190.28 2.69 775,035.32
6057+460.00 18.1080 0.1400 28.78 0.27 10.00 287.77 374.10 2.71 775,406.71
6057+480.00 0.0000 21.2320 18.11 21.37 10.00 181.08 235.40 213.72 775,428.40
6057+500.00 0.0000 25.1720 0.00 46.40 10.00 0.00 0.00 464.04 774,964.36
6057+520.00 0.0000 27.9210 0.00 53.09 10.00 0.00 0.00 530.93 774,433.43
296
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6057+540.00 0.0000 19.1780 0.00 47.10 10.00 0.00 0.00 470.99 773,962.44
6057+560.00 0.6600 10.3530 0.66 29.53 10.00 6.60 8.58 295.31 773,675.71
6057+580.00 0.0000 10.6820 0.66 21.04 10.00 6.60 8.58 210.35 773,473.94
6057+600.00 0.0000 16.9990 0.00 27.68 10.00 0.00 0.00 276.81 773,197.13
6057+620.00 0.0000 17.0230 0.00 34.02 10.00 0.00 0.00 340.22 772,856.91
6057+640.00 0.0000 22.9940 0.00 40.02 10.00 0.00 0.00 400.17 772,456.74
6057+660.00 0.0000 29.9050 0.00 52.90 10.00 0.00 0.00 528.99 771,927.75
6057+680.00 0.0000 21.8470 0.00 51.75 10.00 0.00 0.00 517.52 771,410.23
6057+700.00 0.0000 32.5110 0.00 54.36 10.00 0.00 0.00 543.58 770,866.65
6057+720.00 0.0000 21.1410 0.00 53.65 10.00 0.00 0.00 536.52 770,330.13
6057+740.00 0.0000 33.1100 0.00 54.25 10.00 0.00 0.00 542.51 769,787.62
6057+760.00 0.0000 34.7350 0.00 67.85 10.00 0.00 0.00 678.45 769,109.17
6057+780.00 0.0000 30.6610 0.00 65.40 10.00 0.00 0.00 653.96 768,455.21
6057+800.00 0.0000 29.9950 0.00 60.66 10.00 0.00 0.00 606.56 767,848.65
6057+820.00 0.0000 31.4250 0.00 61.42 10.00 0.00 0.00 614.20 767,234.45
6057+840.00 0.0000 29.1540 0.00 60.58 10.00 0.00 0.00 605.79 766,628.66
6057+860.00 3.7220 7.9700 3.72 37.12 10.00 37.22 48.39 371.24 766,305.80
6057+880.00 0.0000 13.5640 3.72 21.53 10.00 37.22 48.39 215.34 766,138.85
6057+900.00 0.0000 18.5990 0.00 32.16 10.00 0.00 0.00 321.63 765,817.22
6057+920.00 0.0000 33.2720 0.00 51.87 10.00 0.00 0.00 518.71 765,298.51
6057+940.00 0.0000 35.6880 0.00 68.96 10.00 0.00 0.00 689.60 764,608.91
6057+960.00 0.0000 22.4800 0.00 58.17 10.00 0.00 0.00 581.68 764,027.23
6057+980.00 0.5720 5.5500 0.57 28.03 10.00 5.72 7.44 280.30 763,754.37
6058+000.00 0.4630 9.7210 1.04 15.27 10.00 10.35 13.46 152.71 763,615.11
6058+020.00 0.0000 14.2830 0.46 24.00 10.00 4.63 6.02 240.04 763,381.09
6058+040.00 0.0000 27.5310 0.00 41.81 10.00 0.00 0.00 418.14 762,962.95
6058+060.00 0.5140 11.0360 0.51 38.57 10.00 5.14 6.68 385.67 762,583.96
6058+080.00 0.0000 10.9100 0.51 21.95 10.00 5.14 6.68 219.46 762,371.18
6058+100.00 0.0000 12.1260 0.00 23.04 10.00 0.00 0.00 230.36 762,140.82
6058+120.00 0.5130 3.8620 0.51 15.99 10.00 5.13 6.67 159.88 761,987.61
6058+140.00 0.0000 23.6020 0.51 27.46 10.00 5.13 6.67 274.64 761,719.64
6058+160.00 0.5400 4.6750 0.54 28.28 10.00 5.40 7.02 282.77 761,443.89
6058+180.00 0.0000 15.7310 0.54 20.41 10.00 5.40 7.02 204.06 761,246.85
6058+200.00 0.0000 19.9420 0.00 35.67 10.00 0.00 0.00 356.73 760,890.12
6058+220.00 0.0000 18.3120 0.00 38.25 10.00 0.00 0.00 382.54 760,507.58
6058+240.00 0.0000 16.8500 0.00 35.16 10.00 0.00 0.00 351.62 760,155.96
6058+260.00 0.0000 34.2110 0.00 51.06 10.00 0.00 0.00 510.61 759,645.35
6058+280.00 0.0000 32.9350 0.00 67.15 10.00 0.00 0.00 671.46 758,973.89
6058+300.00 0.0000 9.3230 0.00 42.26 10.00 0.00 0.00 422.58 758,551.31
6058+320.00 0.0000 13.9140 0.00 23.24 10.00 0.00 0.00 232.37 758,318.94
6058+340.00 0.0000 21.5690 0.00 35.48 10.00 0.00 0.00 354.83 757,964.11
6058+360.00 0.9140 15.2840 0.91 36.85 10.00 9.14 11.88 368.53 757,607.46
6058+380.00 0.0000 30.3800 0.91 45.66 10.00 9.14 11.88 456.64 757,162.71
6058+400.00 0.0000 33.5690 0.00 63.95 10.00 0.00 0.00 639.49 756,523.22
6058+420.00 0.0000 33.5930 0.00 67.16 10.00 0.00 0.00 671.62 755,851.60
297
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6058+440.00 0.0000 18.3570 0.00 51.95 10.00 0.00 0.00 519.50 755,332.10
6058+460.00 0.0000 19.3220 0.00 37.68 10.00 0.00 0.00 376.79 754,955.31
6058+480.00 0.0000 25.4890 0.00 44.81 10.00 0.00 0.00 448.11 754,507.20
6058+500.00 0.0000 15.0580 0.00 40.55 10.00 0.00 0.00 405.47 754,101.73
6058+520.00 0.0000 23.1340 0.00 38.19 10.00 0.00 0.00 381.92 753,719.81
6058+540.00 0.0000 12.9660 0.00 36.10 10.00 0.00 0.00 361.00 753,358.81
6058+560.00 1.1970 5.1030 1.20 18.07 10.00 11.97 15.56 180.69 753,193.68
6058+580.00 0.0000 21.1770 1.20 26.28 10.00 11.97 15.56 262.80 752,946.44
6058+600.00 0.0000 19.2620 0.00 40.44 10.00 0.00 0.00 404.39 752,542.05
6058+620.00 0.0000 16.2760 0.00 35.54 10.00 0.00 0.00 355.38 752,186.67
6058+640.00 0.0000 13.3320 0.00 29.61 10.00 0.00 0.00 296.08 751,890.59
6058+660.00 0.0000 27.7280 0.00 41.06 10.00 0.00 0.00 410.60 751,479.99
6058+680.00 0.0000 19.9940 0.00 47.72 10.00 0.00 0.00 477.22 751,002.77
6058+700.00 1.1390 13.5170 1.14 33.51 10.00 11.39 14.81 335.11 750,682.47
6058+720.00 1.3390 6.8410 2.48 20.36 10.00 24.78 32.21 203.58 750,511.10
6058+740.00 0.0000 20.6680 1.34 27.51 10.00 13.39 17.41 275.09 750,253.42
6058+760.00 0.0000 21.5700 0.00 42.24 10.00 0.00 0.00 422.38 749,831.04
6058+780.00 0.9770 3.3580 0.98 24.93 10.00 9.77 12.70 249.28 749,594.46
6058+800.00 0.0000 20.5380 0.98 23.90 10.00 9.77 12.70 238.96 749,368.20
6058+820.00 0.0000 19.0080 0.00 39.55 10.00 0.00 0.00 395.46 748,972.74
6058+840.00 4.8450 0.1360 4.85 19.14 10.00 48.45 62.99 191.44 748,844.28
6058+860.00 9.6970 0.1250 14.54 0.26 10.00 145.42 189.05 2.61 749,030.72
6058+880.00 9.3200 0.1340 19.02 0.26 10.00 190.17 247.22 2.59 749,275.35
6058+900.00 0.0000 17.2100 9.32 17.34 10.00 93.20 121.16 173.44 749,223.07
6058+920.00 0.0000 24.9430 0.00 42.15 10.00 0.00 0.00 421.53 748,801.54
6058+940.00 0.0000 22.8560 0.00 47.80 10.00 0.00 0.00 477.99 748,323.55
6058+960.00 0.0000 19.6210 0.00 42.48 10.00 0.00 0.00 424.77 747,898.78
6058+980.00 0.0000 17.9670 0.00 37.59 10.00 0.00 0.00 375.88 747,522.90
6059+000.00 0.0000 17.6320 0.00 35.60 10.00 0.00 0.00 355.99 747,166.91
6059+020.00 0.0000 19.5530 0.00 37.19 10.00 0.00 0.00 371.85 746,795.06
6059+040.00 0.6140 14.9500 0.61 34.50 10.00 6.14 7.98 345.03 746,458.01
6059+060.00 0.0000 21.6680 0.61 36.62 10.00 6.14 7.98 366.18 746,099.81
6059+080.00 0.0000 18.8690 0.00 40.54 10.00 0.00 0.00 405.37 745,694.44
6059+100.00 0.0000 19.9120 0.00 38.78 10.00 0.00 0.00 387.81 745,306.63
6059+120.00 0.7300 15.4590 0.73 35.37 10.00 7.30 9.49 353.71 744,962.41
6059+140.00 0.5620 13.9020 1.29 29.36 10.00 12.92 16.80 293.61 744,685.60
6059+160.00 0.0000 19.2380 0.56 33.14 10.00 5.62 7.31 331.40 744,361.51
6059+180.00 0.5970 11.7430 0.60 30.98 10.00 5.97 7.76 309.81 744,059.46
6059+200.00 0.0000 21.7510 0.60 33.49 10.00 5.97 7.76 334.94 743,732.28
6059+220.00 0.0000 16.2860 0.00 38.04 10.00 0.00 0.00 380.37 743,351.91
6059+240.00 0.0000 23.4090 0.00 39.70 10.00 0.00 0.00 396.95 742,954.96
6059+260.00 1.9900 0.4290 1.99 23.84 10.00 19.90 25.87 238.38 742,742.45
6059+280.00 0.0000 12.3780 1.99 12.81 10.00 19.90 25.87 128.07 742,640.25
6059+300.00 1.6140 7.3390 1.61 19.72 10.00 16.14 20.98 197.17 742,464.06
6059+320.00 0.0000 23.3380 1.61 30.68 10.00 16.14 20.98 306.77 742,178.27
298
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6059+340.00 0.0000 32.3110 0.00 55.65 10.00 0.00 0.00 556.49 741,621.78
6059+360.00 0.0000 33.9050 0.00 66.22 10.00 0.00 0.00 662.16 740,959.62
6059+380.00 0.0000 29.6460 0.00 63.55 10.00 0.00 0.00 635.51 740,324.11
6059+400.00 0.0000 17.0910 0.00 46.74 10.00 0.00 0.00 467.37 739,856.74
6059+420.00 0.0000 7.4510 0.00 24.54 10.00 0.00 0.00 245.42 739,611.32
6059+440.00 0.0000 9.1700 0.00 16.62 10.00 0.00 0.00 166.21 739,445.11
6059+460.00 0.0000 11.7070 0.00 20.88 10.00 0.00 0.00 208.77 739,236.34
6059+480.00 1.0310 10.5800 1.03 22.29 10.00 10.31 13.40 222.87 739,026.88
6059+500.00 0.6140 10.8880 1.65 21.47 10.00 16.45 21.39 214.68 738,833.58
6059+520.00 0.0000 9.2940 0.61 20.18 10.00 6.14 7.98 201.82 738,639.74
6059+540.00 0.0000 19.4030 0.00 28.70 10.00 0.00 0.00 286.97 738,352.77
6059+560.00 0.0000 27.3570 0.00 46.76 10.00 0.00 0.00 467.60 737,885.17
6059+580.00 0.0000 24.2290 0.00 51.59 10.00 0.00 0.00 515.86 737,369.31
6059+600.00 0.0000 22.0720 0.00 46.30 10.00 0.00 0.00 463.01 736,906.30
6059+620.00 0.0000 21.3830 0.00 43.46 10.00 0.00 0.00 434.55 736,471.75
6059+640.00 0.0000 22.0540 0.00 43.44 10.00 0.00 0.00 434.37 736,037.38
6059+660.00 0.0000 18.2830 0.00 40.34 10.00 0.00 0.00 403.37 735,634.01
6059+680.00 1.0530 7.9540 1.05 26.24 10.00 10.53 13.69 262.37 735,385.33
6059+700.00 0.5260 8.8810 1.58 16.84 10.00 15.79 20.53 168.35 735,237.51
6059+720.00 0.0000 10.2590 0.53 19.14 10.00 5.26 6.84 191.40 735,052.95
6059+740.00 0.0000 11.0190 0.00 21.28 10.00 0.00 0.00 212.78 734,840.17
6059+760.00 0.0000 14.1630 0.00 25.18 10.00 0.00 0.00 251.82 734,588.35
6059+780.00 0.0000 8.5200 0.00 22.68 10.00 0.00 0.00 226.83 734,361.52
6059+800.00 0.0000 7.7760 0.00 16.30 10.00 0.00 0.00 162.96 734,198.56
6059+820.00 1.0080 9.7530 1.01 17.53 10.00 10.08 13.10 175.29 734,036.37
6059+840.00 0.0000 15.7360 1.01 25.49 10.00 10.08 13.10 254.89 733,794.58
6059+860.00 0.5340 13.7970 0.53 29.53 10.00 5.34 6.94 295.33 733,506.20
6059+880.00 0.0000 22.1080 0.53 35.91 10.00 5.34 6.94 359.05 733,154.09
6059+900.00 0.0000 16.6470 0.00 38.76 10.00 0.00 0.00 387.55 732,766.54
6059+920.00 0.0000 9.8310 0.00 26.48 10.00 0.00 0.00 264.78 732,501.76
6059+940.00 0.0000 19.2800 0.00 29.11 10.00 0.00 0.00 291.11 732,210.65
6059+960.00 0.0000 17.3250 0.00 36.61 10.00 0.00 0.00 366.05 731,844.60
6059+980.00 0.0000 13.9970 0.00 31.32 10.00 0.00 0.00 313.22 731,531.38
6060+000.00 0.0000 24.3040 0.00 38.30 10.00 0.00 0.00 383.01 731,148.37
6060+020.00 0.0000 25.4920 0.00 49.80 10.00 0.00 0.00 497.96 730,650.41
6060+040.00 0.0000 24.1260 0.00 49.62 10.00 0.00 0.00 496.18 730,154.23
6060+060.00 0.0000 18.5160 0.00 42.64 10.00 0.00 0.00 426.42 729,727.81
6060+080.00 0.0000 15.8530 0.00 34.37 10.00 0.00 0.00 343.69 729,384.12
6060+100.00 0.0000 20.6930 0.00 36.55 10.00 0.00 0.00 365.46 729,018.66
6060+120.00 0.0000 13.8660 0.00 34.56 10.00 0.00 0.00 345.59 728,673.07
6060+140.00 0.0000 16.5270 0.00 30.39 10.00 0.00 0.00 303.93 728,369.14
6060+160.00 0.0000 13.8830 0.00 30.41 10.00 0.00 0.00 304.10 728,065.04
6060+180.00 0.0000 19.6940 0.00 33.58 10.00 0.00 0.00 335.77 727,729.27
6060+200.00 1.6740 8.5380 1.67 28.23 10.00 16.74 21.76 282.32 727,468.71
6060+220.00 0.5850 15.4970 2.26 24.04 10.00 22.59 29.37 240.35 727,257.73
299
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6060+240.00 0.0000 31.6120 0.59 47.11 10.00 5.85 7.61 471.09 726,794.24
6060+260.00 0.0000 38.8550 0.00 70.47 10.00 0.00 0.00 704.67 726,089.57
6060+280.00 0.0000 37.3180 0.00 76.17 10.00 0.00 0.00 761.73 725,327.84
6060+300.00 0.0000 29.1700 0.00 66.49 10.00 0.00 0.00 664.88 724,662.96
6060+320.00 0.0000 30.7450 0.00 59.92 10.00 0.00 0.00 599.15 724,063.81
6060+340.00 0.0000 18.3890 0.00 49.13 10.00 0.00 0.00 491.34 723,572.47
6060+360.00 1.4300 3.4770 1.43 21.87 10.00 14.30 18.59 218.66 723,372.40
6060+380.00 5.1460 0.1300 6.58 3.61 10.00 65.76 85.49 36.07 723,421.82
6060+400.00 0.0000 17.1000 5.15 17.23 10.00 51.46 66.90 172.30 723,316.42
6060+420.00 0.0000 24.2800 0.00 41.38 10.00 0.00 0.00 413.80 722,902.62
6060+440.00 0.0000 12.0160 0.00 36.30 10.00 0.00 0.00 362.96 722,539.66
6060+460.00 0.0000 9.3420 0.00 21.36 10.00 0.00 0.00 213.58 722,326.08
6060+480.00 0.0000 12.8380 0.00 22.18 10.00 0.00 0.00 221.80 722,104.28
6060+500.00 0.0000 13.9130 0.00 26.75 10.00 0.00 0.00 267.51 721,836.77
6060+520.00 0.0000 17.0900 0.00 31.00 10.00 0.00 0.00 310.03 721,526.74
6060+540.00 0.6890 16.8710 0.69 33.96 10.00 6.89 8.96 339.61 721,196.09
6060+560.00 0.0000 31.2150 0.69 48.09 10.00 6.89 8.96 480.86 720,724.18
6060+580.00 0.0000 17.3180 0.00 48.53 10.00 0.00 0.00 485.33 720,238.85
6060+600.00 0.4450 8.2740 0.45 25.59 10.00 4.45 5.79 255.92 719,988.72
6060+620.00 0.0000 21.6790 0.45 29.95 10.00 4.45 5.79 299.53 719,694.97
6060+640.00 0.0000 27.0990 0.00 48.78 10.00 0.00 0.00 487.78 719,207.19
6060+660.00 0.0000 9.7600 0.00 36.86 10.00 0.00 0.00 368.59 718,838.60
6060+680.00 0.0000 21.4000 0.00 31.16 10.00 0.00 0.00 311.60 718,527.00
6060+700.00 0.0000 17.5910 0.00 38.99 10.00 0.00 0.00 389.91 718,137.09
6060+720.00 0.5830 13.3760 0.58 30.97 10.00 5.83 7.58 309.67 717,835.00
6060+740.00 0.0000 13.1110 0.58 26.49 10.00 5.83 7.58 264.87 717,577.71
6060+760.00 8.8200 0.1430 8.82 13.25 10.00 88.20 114.66 132.54 717,559.83
6060+780.00 2.1840 5.5680 11.00 5.71 10.00 110.04 143.05 57.11 717,645.77
6060+800.00 0.0000 17.6320 2.18 23.20 10.00 21.84 28.39 232.00 717,442.16
6060+820.00 5.9050 0.1180 5.91 17.75 10.00 59.05 76.77 177.50 717,341.43
6060+840.00 0.0000 10.3640 5.91 10.48 10.00 59.05 76.77 104.82 717,313.37
6060+860.00 0.0000 20.6590 0.00 31.02 10.00 0.00 0.00 310.23 717,003.14
6060+880.00 0.0000 13.8340 0.00 34.49 10.00 0.00 0.00 344.93 716,658.21
6060+900.00 0.0000 23.9530 0.00 37.79 10.00 0.00 0.00 377.87 716,280.34
6060+920.00 0.0000 27.2240 0.00 51.18 10.00 0.00 0.00 511.77 715,768.57
6060+940.00 0.0000 21.9920 0.00 49.22 10.00 0.00 0.00 492.16 715,276.41
6060+960.00 0.0000 19.0850 0.00 41.08 10.00 0.00 0.00 410.77 714,865.64
6060+980.00 0.0000 28.3520 0.00 47.44 10.00 0.00 0.00 474.37 714,391.27
6061+000.00 0.0000 32.5110 0.00 60.86 10.00 0.00 0.00 608.63 713,782.64
6061+020.00 0.0000 23.4320 0.00 55.94 10.00 0.00 0.00 559.43 713,223.21
6061+040.00 0.0000 24.3170 0.00 47.75 10.00 0.00 0.00 477.49 712,745.72
6061+060.00 0.0000 22.9080 0.00 47.23 10.00 0.00 0.00 472.25 712,273.47
6061+080.00 0.0000 34.5790 0.00 57.49 10.00 0.00 0.00 574.87 711,698.60
6061+100.00 0.0000 29.6940 0.00 64.27 10.00 0.00 0.00 642.73 711,055.87
6061+120.00 0.0000 22.0190 0.00 51.71 10.00 0.00 0.00 517.13 710,538.74
300
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6061+140.00 0.0000 12.3490 0.00 34.37 10.00 0.00 0.00 343.68 710,195.06
6061+160.00 0.5150 11.1640 0.52 23.51 10.00 5.15 6.70 235.13 709,966.63
6061+180.00 0.0000 11.7270 0.52 22.89 10.00 5.15 6.70 228.91 709,744.41
6061+200.00 0.0000 31.5330 0.00 43.26 10.00 0.00 0.00 432.60 709,311.81
6061+220.00 0.0000 34.1670 0.00 65.70 10.00 0.00 0.00 657.00 708,654.81
6061+240.00 0.0000 25.9860 0.00 60.15 10.00 0.00 0.00 601.53 708,053.28
6061+260.00 0.0000 32.8250 0.00 58.81 10.00 0.00 0.00 588.11 707,465.17
6061+280.00 0.0000 20.8890 0.00 53.71 10.00 0.00 0.00 537.14 706,928.03
6061+300.00 0.0000 22.1560 0.00 43.05 10.00 0.00 0.00 430.45 706,497.58
6061+320.00 0.0000 26.2140 0.00 48.37 10.00 0.00 0.00 483.70 706,013.88
6061+340.00 0.0000 26.5500 0.00 52.76 10.00 0.00 0.00 527.64 705,486.24
6061+360.00 0.0000 20.1290 0.00 46.68 10.00 0.00 0.00 466.79 705,019.45
6061+380.00 0.0000 15.5500 0.00 35.68 10.00 0.00 0.00 356.79 704,662.66
6061+400.00 0.0000 18.1150 0.00 33.67 10.00 0.00 0.00 336.65 704,326.01
6061+420.00 0.0000 23.0600 0.00 41.18 10.00 0.00 0.00 411.75 703,914.26
6061+440.00 0.0000 15.6320 0.00 38.69 10.00 0.00 0.00 386.92 703,527.34
6061+460.00 0.0000 14.7460 0.00 30.38 10.00 0.00 0.00 303.78 703,223.56
6061+480.00 0.0000 23.9280 0.00 38.67 10.00 0.00 0.00 386.74 702,836.82
6061+500.00 0.5600 10.4530 0.56 34.38 10.00 5.60 7.28 343.81 702,500.29
6061+520.00 0.0000 21.4430 0.56 31.90 10.00 5.60 7.28 318.96 702,188.61
6061+540.00 0.0000 28.5230 0.00 49.97 10.00 0.00 0.00 499.66 701,688.95
6061+560.00 0.0000 23.8700 0.00 52.39 10.00 0.00 0.00 523.93 701,165.02
6061+580.00 0.7700 8.8130 0.77 32.68 10.00 7.70 10.01 326.83 700,848.20
6061+600.00 2.1860 3.7490 2.96 12.56 10.00 29.56 38.43 125.62 700,761.01
6061+620.00 0.0000 17.3600 2.19 21.11 10.00 21.86 28.42 211.09 700,578.34
6061+640.00 0.0000 23.3670 0.00 40.73 10.00 0.00 0.00 407.27 700,171.07
6061+660.00 0.0000 12.1720 0.00 35.54 10.00 0.00 0.00 355.39 699,815.68
6061+680.00 0.0000 27.1410 0.00 39.31 10.00 0.00 0.00 393.13 699,422.55
6061+700.00 0.0000 22.4350 0.00 49.58 10.00 0.00 0.00 495.76 698,926.79
6061+720.00 0.0000 11.8690 0.00 34.30 10.00 0.00 0.00 343.04 698,583.75
6061+740.00 0.0000 26.4370 0.00 38.31 10.00 0.00 0.00 383.06 698,200.69
6061+760.00 0.0000 34.9140 0.00 61.35 10.00 0.00 0.00 613.51 697,587.18
6061+780.00 0.0000 29.1010 0.00 64.02 10.00 0.00 0.00 640.15 696,947.03
6061+800.00 0.0000 34.6450 0.00 63.75 10.00 0.00 0.00 637.46 696,309.57
6061+820.00 0.0000 55.7460 0.00 90.39 10.00 0.00 0.00 903.91 695,405.66
6061+840.00 0.0000 56.3210 0.00 112.07 10.00 0.00 0.00 1,120.67 694,284.99
6061+860.00 0.0000 52.9050 0.00 109.23 10.00 0.00 0.00 1,092.26 693,192.73
6061+880.00 0.0000 45.3660 0.00 98.27 10.00 0.00 0.00 982.71 692,210.02
6061+900.00 0.0000 44.2510 0.00 89.62 10.00 0.00 0.00 896.17 691,313.85
6061+920.00 0.0000 62.3930 0.00 106.64 10.00 0.00 0.00 1,066.44 690,247.41
6061+940.00 0.0000 60.2400 0.00 122.63 10.00 0.00 0.00 1,226.33 689,021.08
6061+960.00 0.0000 47.0930 0.00 107.33 10.00 0.00 0.00 1,073.33 687,947.75
6061+980.00 0.0000 32.6540 0.00 79.75 10.00 0.00 0.00 797.47 687,150.28
6062+000.00 0.0000 22.9470 0.00 55.60 10.00 0.00 0.00 556.01 686,594.27
6062+020.00 0.0000 14.5560 0.00 37.50 10.00 0.00 0.00 375.03 686,219.24
301
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6062+040.00 0.0000 17.7420 0.00 32.30 10.00 0.00 0.00 322.98 685,896.26
6062+060.00 1.3860 7.7930 1.39 25.54 10.00 13.86 18.02 255.35 685,658.93
6062+080.00 1.5140 7.7030 2.90 15.50 10.00 29.00 37.70 154.96 685,541.67
6062+100.00 0.0000 26.9740 1.51 34.68 10.00 15.14 19.68 346.77 685,214.58
6062+120.00 0.0000 33.6440 0.00 60.62 10.00 0.00 0.00 606.18 684,608.40
6062+140.00 0.0000 32.2830 0.00 65.93 10.00 0.00 0.00 659.27 683,949.13
6062+160.00 0.0000 28.8380 0.00 61.12 10.00 0.00 0.00 611.21 683,337.92
6062+180.00 0.0000 29.3730 0.00 58.21 10.00 0.00 0.00 582.11 682,755.81
6062+200.00 0.0000 26.3940 0.00 55.77 10.00 0.00 0.00 557.67 682,198.14
6062+220.00 0.0000 19.8870 0.00 46.28 10.00 0.00 0.00 462.81 681,735.33
6062+240.00 0.0000 22.0610 0.00 41.95 10.00 0.00 0.00 419.48 681,315.85
6062+260.00 0.0000 28.6190 0.00 50.68 10.00 0.00 0.00 506.80 680,809.05
6062+280.00 0.0000 31.5450 0.00 60.16 10.00 0.00 0.00 601.64 680,207.41
6062+300.00 0.0000 28.6890 0.00 60.23 10.00 0.00 0.00 602.34 679,605.07
6062+320.00 0.0000 27.0700 0.00 55.76 10.00 0.00 0.00 557.59 679,047.48
6062+340.00 0.0000 27.5610 0.00 54.63 10.00 0.00 0.00 546.31 678,501.17
6062+360.00 0.0000 19.4910 0.00 47.05 10.00 0.00 0.00 470.52 678,030.65
6062+380.00 0.0000 10.5690 0.00 30.06 10.00 0.00 0.00 300.60 677,730.05
6062+400.00 0.0000 20.5340 0.00 31.10 10.00 0.00 0.00 311.03 677,419.02
6062+420.00 0.0000 29.5900 0.00 50.12 10.00 0.00 0.00 501.24 676,917.78
6062+440.00 0.0000 31.8690 0.00 61.46 10.00 0.00 0.00 614.59 676,303.19
6062+460.00 0.0000 32.2380 0.00 64.11 10.00 0.00 0.00 641.07 675,662.12
6062+480.00 0.0000 27.9880 0.00 60.23 10.00 0.00 0.00 602.26 675,059.86
6062+500.00 0.0000 24.9630 0.00 52.95 10.00 0.00 0.00 529.51 674,530.35
6062+520.00 0.0000 25.5550 0.00 50.52 10.00 0.00 0.00 505.18 674,025.17
6062+540.00 0.0000 34.9270 0.00 60.48 10.00 0.00 0.00 604.82 673,420.35
6062+560.00 0.0000 38.4440 0.00 73.37 10.00 0.00 0.00 733.71 672,686.64
6062+580.00 0.0000 37.7900 0.00 76.23 10.00 0.00 0.00 762.34 671,924.30
6062+600.00 0.0000 35.4510 0.00 73.24 10.00 0.00 0.00 732.41 671,191.89
6062+620.00 0.0000 27.1210 0.00 62.57 10.00 0.00 0.00 625.72 670,566.17
6062+640.00 0.0000 24.8030 0.00 51.92 10.00 0.00 0.00 519.24 670,046.93
6062+660.00 0.6140 9.9160 0.61 34.72 10.00 6.14 7.98 347.19 669,707.72
6062+680.00 0.0000 22.9370 0.61 32.85 10.00 6.14 7.98 328.53 669,387.17
6062+700.00 0.9450 8.9200 0.95 31.86 10.00 9.45 12.29 318.57 669,080.89
6062+720.00 0.0000 20.5190 0.95 29.44 10.00 9.45 12.29 294.39 668,798.78
6062+740.00 0.0000 39.9690 0.00 60.49 10.00 0.00 0.00 604.88 668,193.90
6062+760.00 0.0000 43.2010 0.00 83.17 10.00 0.00 0.00 831.70 667,362.20
6062+780.00 0.0000 37.1840 0.00 80.39 10.00 0.00 0.00 803.85 666,558.35
6062+800.00 0.0000 24.5640 0.00 61.75 10.00 0.00 0.00 617.48 665,940.87
6062+820.00 0.7150 4.9790 0.72 29.54 10.00 7.15 9.30 295.43 665,654.74
6062+840.00 9.9780 0.4580 10.69 5.44 10.00 106.93 139.01 54.37 665,739.38
6062+860.00 11.9720 0.1420 21.95 0.60 10.00 219.50 285.35 6.00 666,018.73
6062+880.00 0.9420 9.3210 12.91 9.46 10.00 129.14 167.88 94.63 666,091.98
6062+900.00 0.0000 19.7360 0.94 29.06 10.00 9.42 12.25 290.57 665,813.66
6062+920.00 0.0000 23.0020 0.00 42.74 10.00 0.00 0.00 427.38 665,386.28
302
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6062+940.00 0.0000 22.4520 0.00 45.45 10.00 0.00 0.00 454.54 664,931.74
6062+960.00 0.0000 12.5530 0.00 35.01 10.00 0.00 0.00 350.05 664,581.69
6062+980.00 0.6730 13.3300 0.67 25.88 10.00 6.73 8.75 258.83 664,331.61
6063+000.00 0.0000 22.7520 0.67 36.08 10.00 6.73 8.75 360.82 663,979.53
6063+020.00 0.0000 22.5450 0.00 45.30 10.00 0.00 0.00 452.97 663,526.56
6063+040.00 0.0000 12.5330 0.00 35.08 10.00 0.00 0.00 350.78 663,175.78
6063+060.00 0.0000 9.0420 0.00 21.58 10.00 0.00 0.00 215.75 662,960.03
6063+080.00 0.0000 15.1080 0.00 24.15 10.00 0.00 0.00 241.50 662,718.53
6063+100.00 3.6500 9.6060 3.65 24.71 10.00 36.50 47.45 247.14 662,518.84
6063+120.00 4.0550 2.6730 7.71 12.28 10.00 77.05 100.17 122.79 662,496.22
6063+140.00 0.0000 27.6680 4.06 30.34 10.00 40.55 52.72 303.41 662,245.52
6063+160.00 0.0000 41.5190 0.00 69.19 10.00 0.00 0.00 691.87 661,553.65
6063+180.00 0.0000 33.3420 0.00 74.86 10.00 0.00 0.00 748.61 660,805.04
6063+200.00 0.0000 26.2130 0.00 59.56 10.00 0.00 0.00 595.55 660,209.49
6063+220.00 0.0000 35.6690 0.00 61.88 10.00 0.00 0.00 618.82 659,590.67
6063+240.00 0.0000 38.8630 0.00 74.53 10.00 0.00 0.00 745.32 658,845.35
6063+260.00 0.0000 33.6650 0.00 72.53 10.00 0.00 0.00 725.28 658,120.07
6063+280.00 0.0000 23.6300 0.00 57.30 10.00 0.00 0.00 572.95 657,547.12
6063+300.00 0.0000 25.3790 0.00 49.01 10.00 0.00 0.00 490.09 657,057.03
6063+320.00 0.0000 20.2760 0.00 45.66 10.00 0.00 0.00 456.55 656,600.48
6063+340.00 0.0000 38.5830 0.00 58.86 10.00 0.00 0.00 588.59 656,011.89
6063+360.00 0.0000 28.0170 0.00 66.60 10.00 0.00 0.00 666.00 655,345.89
6063+380.00 0.0000 26.8390 0.00 54.86 10.00 0.00 0.00 548.56 654,797.33
6063+400.00 0.0000 25.1800 0.00 52.02 10.00 0.00 0.00 520.19 654,277.14
6063+420.00 0.0000 27.3040 0.00 52.48 10.00 0.00 0.00 524.84 653,752.30
6063+440.00 1.6870 4.1020 1.69 31.41 10.00 16.87 21.93 314.06 653,460.18
6063+460.00 0.7880 7.0250 2.48 11.13 10.00 24.75 32.18 111.27 653,381.08
6063+480.00 0.0000 21.5490 0.79 28.57 10.00 7.88 10.24 285.74 653,105.58
6063+500.00 0.0000 27.2270 0.00 48.78 10.00 0.00 0.00 487.76 652,617.82
6063+520.00 3.2020 5.5630 3.20 32.79 10.00 32.02 41.63 327.90 652,331.55
6063+540.00 5.6150 1.4050 8.82 6.97 10.00 88.17 114.62 69.68 652,376.49
6063+560.00 0.0000 21.0800 5.62 22.49 10.00 56.15 73.00 224.85 652,224.64
6063+580.00 0.0000 35.5560 0.00 56.64 10.00 0.00 0.00 566.36 651,658.28
6063+600.00 0.0000 35.3970 0.00 70.95 10.00 0.00 0.00 709.53 650,948.75
6063+620.00 0.0000 33.9660 0.00 69.36 10.00 0.00 0.00 693.63 650,255.12
6063+640.00 0.0000 33.3560 0.00 67.32 10.00 0.00 0.00 673.22 649,581.90
6063+660.00 0.0000 26.9100 0.00 60.27 10.00 0.00 0.00 602.66 648,979.24
6063+680.00 0.0000 24.3940 0.00 51.30 10.00 0.00 0.00 513.04 648,466.20
6063+700.00 0.0000 23.0860 0.00 47.48 10.00 0.00 0.00 474.80 647,991.40
6063+720.00 0.0000 19.8620 0.00 42.95 10.00 0.00 0.00 429.48 647,561.92
6063+740.00 1.8300 13.2820 1.83 33.14 10.00 18.30 23.79 331.44 647,254.27
6063+760.00 0.0000 24.8410 1.83 38.12 10.00 18.30 23.79 381.23 646,896.83
6063+780.00 0.0000 19.6940 0.00 44.54 10.00 0.00 0.00 445.35 646,451.48
6063+800.00 0.0000 21.7240 0.00 41.42 10.00 0.00 0.00 414.18 646,037.30
6063+820.00 0.0000 22.7140 0.00 44.44 10.00 0.00 0.00 444.38 645,592.92
303
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6063+840.00 0.0000 21.0440 0.00 43.76 10.00 0.00 0.00 437.58 645,155.34
6063+860.00 0.0000 30.5580 0.00 51.60 10.00 0.00 0.00 516.02 644,639.32
6063+880.00 0.0000 13.9280 0.00 44.49 10.00 0.00 0.00 444.86 644,194.46
6063+900.00 1.2300 3.1250 1.23 17.05 10.00 12.30 15.99 170.53 644,039.92
6063+920.00 0.0000 28.4370 1.23 31.56 10.00 12.30 15.99 315.62 643,740.29
6063+940.00 0.0000 23.1000 0.00 51.54 10.00 0.00 0.00 515.37 643,224.92
6063+960.00 0.0000 23.0100 0.00 46.11 10.00 0.00 0.00 461.10 642,763.82
6063+980.00 0.0000 32.6020 0.00 55.61 10.00 0.00 0.00 556.12 642,207.70
6064+000.00 0.0000 34.2330 0.00 66.84 10.00 0.00 0.00 668.35 641,539.35
6064+020.00 0.0000 27.4190 0.00 61.65 10.00 0.00 0.00 616.52 640,922.83
6064+040.00 0.0000 12.6980 0.00 40.12 10.00 0.00 0.00 401.17 640,521.66
6064+060.00 0.0000 7.9260 0.00 20.62 10.00 0.00 0.00 206.24 640,315.42
6064+080.00 0.4430 15.1640 0.44 23.09 10.00 4.43 5.76 230.90 640,090.28
6064+100.00 0.0000 15.4180 0.44 30.58 10.00 4.43 5.76 305.82 639,790.21
6064+120.00 0.0000 21.0750 0.00 36.49 10.00 0.00 0.00 364.93 639,425.28
6064+140.00 0.0000 18.1490 0.00 39.22 10.00 0.00 0.00 392.24 639,033.04
6064+160.00 1.1190 12.1800 1.12 30.33 10.00 11.19 14.55 303.29 638,744.30
6064+180.00 0.0000 17.6640 1.12 29.84 10.00 11.19 14.55 298.44 638,460.41
6064+200.00 0.0000 22.0920 0.00 39.76 10.00 0.00 0.00 397.56 638,062.85
6064+220.00 0.0000 20.4850 0.00 42.58 10.00 0.00 0.00 425.77 637,637.08
6064+240.00 0.0000 22.5520 0.00 43.04 10.00 0.00 0.00 430.37 637,206.71
6064+260.00 0.6000 19.4440 0.60 42.00 10.00 6.00 7.80 419.96 636,794.55
6064+280.00 4.2360 5.8960 4.84 25.34 10.00 48.36 62.87 253.40 636,604.02
6064+300.00 13.4450 0.1360 17.68 6.03 10.00 176.81 229.85 60.32 636,773.55
6064+320.00 1.1680 9.3540 14.61 9.49 10.00 146.13 189.97 94.90 636,868.62
6064+340.00 0.0000 24.1770 1.17 33.53 10.00 11.68 15.18 335.31 636,548.49
6064+360.00 0.0000 19.7490 0.00 43.93 10.00 0.00 0.00 439.26 636,109.23
6064+380.00 0.0000 12.6380 0.00 32.39 10.00 0.00 0.00 323.87 635,785.36
6064+400.00 0.0000 22.6560 0.00 35.29 10.00 0.00 0.00 352.94 635,432.42
6064+420.00 0.0000 14.4100 0.00 37.07 10.00 0.00 0.00 370.66 635,061.76
6064+440.00 0.0000 19.9190 0.00 34.33 10.00 0.00 0.00 343.29 634,718.47
6064+460.00 1.0840 7.9780 1.08 27.90 10.00 10.84 14.09 278.97 634,453.59
6064+480.00 2.0020 14.8790 3.09 22.86 10.00 30.86 40.12 228.57 634,265.14
6064+500.00 0.0000 31.9080 2.00 46.79 10.00 20.02 26.03 467.87 633,823.30
6064+520.00 0.0000 36.2890 0.00 68.20 10.00 0.00 0.00 681.97 633,141.33
6064+540.00 0.0000 31.0860 0.00 67.38 10.00 0.00 0.00 673.75 632,467.58
6064+560.00 0.0000 28.4940 0.00 59.58 10.00 0.00 0.00 595.80 631,871.78
6064+580.00 0.0000 12.7730 0.00 41.27 10.00 0.00 0.00 412.67 631,459.11
6064+600.00 0.0000 28.4820 0.00 41.26 10.00 0.00 0.00 412.55 631,046.56
6064+620.00 0.0000 24.2880 0.00 52.77 10.00 0.00 0.00 527.70 630,518.86
6064+640.00 11.5560 0.0820 11.56 24.37 10.00 115.56 150.23 243.70 630,425.39
6064+660.00 0.0000 12.9760 11.56 13.06 10.00 115.56 150.23 130.58 630,445.03
6064+680.00 0.0000 29.7360 0.00 42.71 10.00 0.00 0.00 427.12 630,017.91
6064+700.00 0.0000 32.6280 0.00 62.36 10.00 0.00 0.00 623.64 629,394.27
6064+720.00 0.0000 30.7070 0.00 63.34 10.00 0.00 0.00 633.35 628,760.92
304
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6064+740.00 0.0000 28.9530 0.00 59.66 10.00 0.00 0.00 596.60 628,164.32
6064+760.00 0.0000 22.5640 0.00 51.52 10.00 0.00 0.00 515.17 627,649.15
6064+780.00 0.0000 21.8420 0.00 44.41 10.00 0.00 0.00 444.06 627,205.09
6064+800.00 0.0000 18.6910 0.00 40.53 10.00 0.00 0.00 405.33 626,799.76
6064+820.00 0.0000 7.0290 0.00 25.72 10.00 0.00 0.00 257.20 626,542.56
6064+840.00 0.0000 20.6330 0.00 27.66 10.00 0.00 0.00 276.62 626,265.94
6064+860.00 0.0000 32.4610 0.00 53.09 10.00 0.00 0.00 530.94 625,735.00
6064+880.00 0.0000 25.9450 0.00 58.41 10.00 0.00 0.00 584.06 625,150.94
6064+900.00 0.0000 27.7990 0.00 53.74 10.00 0.00 0.00 537.44 624,613.50
6064+920.00 0.0000 37.3800 0.00 65.18 10.00 0.00 0.00 651.79 623,961.71
6064+940.00 0.0000 30.4570 0.00 67.84 10.00 0.00 0.00 678.37 623,283.34
6064+960.00 0.0000 25.3060 0.00 55.76 10.00 0.00 0.00 557.63 622,725.71
6064+980.00 0.0000 23.2850 0.00 48.59 10.00 0.00 0.00 485.91 622,239.80
6065+000.00 0.0000 25.3550 0.00 48.64 10.00 0.00 0.00 486.40 621,753.40
6065+020.00 0.0000 27.2420 0.00 52.60 10.00 0.00 0.00 525.97 621,227.43
6065+040.00 0.0000 21.3570 0.00 48.60 10.00 0.00 0.00 485.99 620,741.44
6065+060.00 1.8850 5.1880 1.89 26.55 10.00 18.85 24.51 265.45 620,500.50
6065+080.00 0.9520 5.7030 2.84 10.89 10.00 28.37 36.88 108.91 620,428.47
6065+100.00 0.0000 23.4310 0.95 29.13 10.00 9.52 12.38 291.34 620,149.51
6065+120.00 0.0000 28.5450 0.00 51.98 10.00 0.00 0.00 519.76 619,629.75
6065+140.00 0.0000 32.1400 0.00 60.69 10.00 0.00 0.00 606.85 619,022.90
6065+160.00 0.0000 28.9440 0.00 61.08 10.00 0.00 0.00 610.84 618,412.06
6065+180.00 0.5030 8.9090 0.50 37.85 10.00 5.03 6.54 378.53 618,040.07
6065+200.00 0.0000 14.9290 0.50 23.84 10.00 5.03 6.54 238.38 617,808.22
6065+220.00 0.0000 19.7190 0.00 34.65 10.00 0.00 0.00 346.48 617,461.74
6065+240.00 0.9040 5.2060 0.90 24.93 10.00 9.04 11.75 249.25 617,224.25
6065+260.00 0.3670 4.4180 1.27 9.62 10.00 12.71 16.52 96.24 617,144.53
6065+280.00 0.0000 28.2380 0.37 32.66 10.00 3.67 4.77 326.56 616,822.74
6065+300.00 0.0000 33.3930 0.00 61.63 10.00 0.00 0.00 616.31 616,206.43
6065+320.00 0.0000 32.2610 0.00 65.65 10.00 0.00 0.00 656.54 615,549.89
6065+340.00 0.0000 36.4250 0.00 68.69 10.00 0.00 0.00 686.86 614,863.03
6065+360.00 0.0000 16.3120 0.00 52.74 10.00 0.00 0.00 527.37 614,335.66
6065+380.00 0.0000 17.6760 0.00 33.99 10.00 0.00 0.00 339.88 613,995.78
6065+400.00 0.0000 18.8000 0.00 36.48 10.00 0.00 0.00 364.76 613,631.02
6065+420.00 0.6050 12.3820 0.61 31.18 10.00 6.05 7.87 311.82 613,327.07
6065+440.00 1.7910 4.7650 2.40 17.15 10.00 23.96 31.15 171.47 613,186.74
6065+460.00 0.0000 10.3460 1.79 15.11 10.00 17.91 23.28 151.11 613,058.92
6065+480.00 0.0000 15.6210 0.00 25.97 10.00 0.00 0.00 259.67 612,799.25
6065+500.00 0.0000 16.1080 0.00 31.73 10.00 0.00 0.00 317.29 612,481.96
6065+520.00 0.0000 20.2710 0.00 36.38 10.00 0.00 0.00 363.79 612,118.17
6065+540.00 0.0000 19.5940 0.00 39.87 10.00 0.00 0.00 398.65 611,719.52
6065+560.00 0.0000 17.8510 0.00 37.45 10.00 0.00 0.00 374.45 611,345.07
6065+560.00 0.0000 18.9430 0.00 36.79 0.00 0.00 0.00 0.00 611,345.07
6065+580.00 0.0000 9.4700 0.00 28.41 10.00 0.00 0.00 284.13 611,060.94
6065+600.00 1.0140 15.0740 1.01 24.54 10.00 10.14 13.18 245.44 610,828.68
305
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6065+620.00 0.0000 15.7070 1.01 30.78 10.00 10.14 13.18 307.81 610,534.05
6065+640.00 0.4280 11.3500 0.43 27.06 10.00 4.28 5.56 270.57 610,269.04
6065+660.00 1.0290 6.5750 1.46 17.93 10.00 14.57 18.94 179.25 610,108.74
6065+680.00 0.0000 19.3910 1.03 25.97 10.00 10.29 13.38 259.66 609,862.45
6065+700.00 0.0000 12.6040 0.00 32.00 10.00 0.00 0.00 319.95 609,542.50
6065+710.00 0.7670 7.9500 0.77 20.55 5.00 3.84 4.99 102.77 609,444.72
6065+710.00 0.8000 7.5870 1.57 15.54 0.00 0.00 0.00 0.00 609,444.72
6065+720.00 0.3550 12.9880 1.16 20.58 5.00 5.78 7.51 102.88 609,349.35
6065+740.00 0.0000 22.4420 0.36 35.43 10.00 3.55 4.62 354.30 608,999.67
6065+760.00 0.0000 23.4220 0.00 45.86 10.00 0.00 0.00 458.64 608,541.03
6065+780.00 0.0000 21.9600 0.00 45.38 10.00 0.00 0.00 453.82 608,087.21
6065+800.00 0.0000 24.0950 0.00 46.06 10.00 0.00 0.00 460.55 607,626.66
6065+820.00 0.0000 25.1550 0.00 49.25 10.00 0.00 0.00 492.50 607,134.16
6065+840.00 0.0000 22.1470 0.00 47.30 10.00 0.00 0.00 473.02 606,661.14
6065+860.00 0.7460 7.6660 0.75 29.81 10.00 7.46 9.70 298.13 606,372.70
6065+880.00 8.4700 0.1650 9.22 7.83 10.00 92.16 119.81 78.31 606,414.20
6065+900.00 2.5990 1.2240 11.07 1.39 10.00 110.69 143.90 13.89 606,544.21
6065+920.00 0.0000 13.4070 2.60 14.63 10.00 25.99 33.79 146.31 606,431.69
6065+940.00 0.0000 19.8320 0.00 33.24 10.00 0.00 0.00 332.39 606,099.30
6065+960.00 0.0000 28.5050 0.00 48.34 10.00 0.00 0.00 483.37 605,615.93
6065+980.00 0.0000 27.7670 0.00 56.27 10.00 0.00 0.00 562.72 605,053.21
6066+000.00 0.0000 20.1680 0.00 47.94 10.00 0.00 0.00 479.35 604,573.86
6066+020.00 0.0000 19.1670 0.00 39.34 10.00 0.00 0.00 393.35 604,180.51
6066+040.00 0.0000 13.0850 0.00 32.25 10.00 0.00 0.00 322.52 603,857.99
6066+060.00 1.1150 9.5490 1.12 22.63 10.00 11.15 14.50 226.34 603,646.14
6066+080.00 0.9870 10.7200 2.10 20.27 10.00 21.02 27.33 202.69 603,470.78
6066+100.00 0.6140 6.0870 1.60 16.81 10.00 16.01 20.81 168.07 603,323.52
6066+120.00 0.0000 6.4710 0.61 12.56 10.00 6.14 7.98 125.58 603,205.92
6066+140.00 0.5880 9.3150 0.59 15.79 10.00 5.88 7.64 157.86 603,055.71
6066+160.00 0.0000 18.5230 0.59 27.84 10.00 5.88 7.64 278.38 602,784.97
6066+180.00 0.0000 21.8640 0.00 40.39 10.00 0.00 0.00 403.87 602,381.10
6066+200.00 0.0000 21.6190 0.00 43.48 10.00 0.00 0.00 434.83 601,946.27
6066+220.00 0.0000 24.5560 0.00 46.18 10.00 0.00 0.00 461.75 601,484.52
6066+240.00 0.0000 20.0910 0.00 44.65 10.00 0.00 0.00 446.47 601,038.05
6066+260.00 0.0000 9.3270 0.00 29.42 10.00 0.00 0.00 294.18 600,743.87
6066+280.00 0.0000 28.4600 0.00 37.79 10.00 0.00 0.00 377.87 600,366.00
6066+300.00 0.0000 27.6810 0.00 56.14 10.00 0.00 0.00 561.41 599,804.59
6066+320.00 0.0000 28.9700 0.00 56.65 10.00 0.00 0.00 566.51 599,238.08
6066+340.00 0.0000 29.6830 0.00 58.65 10.00 0.00 0.00 586.53 598,651.55
6066+360.00 0.0000 20.7020 0.00 50.39 10.00 0.00 0.00 503.85 598,147.70
6066+380.00 0.0000 20.3440 0.00 41.05 10.00 0.00 0.00 410.46 597,737.24
6066+400.00 0.0000 30.4640 0.00 50.81 10.00 0.00 0.00 508.08 597,229.16
6066+420.00 0.0000 31.8730 0.00 62.34 10.00 0.00 0.00 623.37 596,605.79
6066+440.00 0.0000 30.1600 0.00 62.03 10.00 0.00 0.00 620.33 595,985.46
6066+460.00 0.4570 11.2860 0.46 41.45 10.00 4.57 5.94 414.46 595,576.94
306
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6066+480.00 0.0000 18.0850 0.46 29.37 10.00 4.57 5.94 293.71 595,289.17
6066+500.00 5.0350 0.7050 5.04 18.79 10.00 50.35 65.46 187.90 595,166.73
6066+520.00 6.4750 4.1300 11.51 4.84 10.00 115.10 149.63 48.35 595,268.01
6066+540.00 1.1940 13.9270 7.67 18.06 10.00 76.69 99.70 180.57 595,187.13
6066+560.00 0.0000 22.8670 1.19 36.79 10.00 11.94 15.52 367.94 594,834.72
6066+580.00 0.0000 11.9830 0.00 34.85 10.00 0.00 0.00 348.50 594,486.22
6066+600.00 0.0000 21.8620 0.00 33.85 10.00 0.00 0.00 338.45 594,147.77
6066+620.00 0.0000 29.2380 0.00 51.10 10.00 0.00 0.00 511.00 593,636.77
6066+640.00 0.0000 28.8180 0.00 58.06 10.00 0.00 0.00 580.56 593,056.21
6066+660.00 0.0000 25.9040 0.00 54.72 10.00 0.00 0.00 547.22 592,508.99
6066+680.00 0.0000 30.2870 0.00 56.19 10.00 0.00 0.00 561.91 591,947.08
6066+700.00 0.0000 21.2020 0.00 51.49 10.00 0.00 0.00 514.89 591,432.19
6066+720.00 0.0000 27.8460 0.00 49.05 10.00 0.00 0.00 490.48 590,941.71
6066+740.00 0.0000 18.6100 0.00 46.46 10.00 0.00 0.00 464.56 590,477.15
6066+760.00 0.0000 16.3710 0.00 34.98 10.00 0.00 0.00 349.81 590,127.34
6066+780.00 0.0000 13.5400 0.00 29.91 10.00 0.00 0.00 299.11 589,828.23
6066+800.00 1.7940 8.8680 1.79 22.41 10.00 17.94 23.32 224.08 589,627.47
6066+820.00 0.0000 17.0120 1.79 25.88 10.00 17.94 23.32 258.80 589,391.99
6066+840.00 1.3950 1.3350 1.40 18.35 10.00 13.95 18.14 183.47 589,226.65
6066+860.00 0.0000 18.6830 1.40 20.02 10.00 13.95 18.14 200.18 589,044.61
6066+880.00 0.0000 38.2600 0.00 56.94 10.00 0.00 0.00 569.43 588,475.18
6066+900.00 0.0000 29.8680 0.00 68.13 10.00 0.00 0.00 681.28 587,793.90
6066+920.00 0.0000 32.6280 0.00 62.50 10.00 0.00 0.00 624.96 587,168.94
6066+940.00 0.0000 22.5450 0.00 55.17 10.00 0.00 0.00 551.73 586,617.21
6066+960.00 0.0000 32.9210 0.00 55.47 10.00 0.00 0.00 554.66 586,062.55
6066+980.00 0.0000 5.8170 0.00 38.74 10.00 0.00 0.00 387.38 585,675.17
6067+000.00 0.0000 27.0200 0.00 32.84 10.00 0.00 0.00 328.37 585,346.80
6.1.2. Cálculo de acarreos para subrasante
A continuación, se presentan los cálculos en las siguientes tablas del cálculo del acarreo del material
para la construcción de la capa de subrasante.
TABLA 29 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO [ADMINISTRADOR]
307
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
308
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
309
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
310
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
311
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
312
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
313
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
314
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
315
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
316
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
317
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
318
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
319
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
320
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
321
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
322
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
323
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
324
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
325
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
326
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
327
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
328
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
329
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
330
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
331
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
332
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
333
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
334
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
335
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
336
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
337
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
338
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
339
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
340
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
341
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
342
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
343
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
344
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
345
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
346
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
347
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
348
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
349
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
350
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
351
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
352
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
353
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
354
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
355
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
356
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
357
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
358
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
359
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 30 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 5071+500 – 6006+000
360
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
361
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
362
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
363
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
364
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
365
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
366
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
367
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
368
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
369
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
370
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 31 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 5043+000 – 5051+000
371
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
372
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
373
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
374
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
375
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
376
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
377
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
378
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
379
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 32 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 5051+000 – 5070+000
380
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
381
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
382
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
383
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
384
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
385
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
386
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
387
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
388
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
389
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
390
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
391
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
392
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
393
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
394
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
395
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
396
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
397
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
398
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
399
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
400
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
401
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 33 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 5070+000 – 6005+000
402
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
403
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
404
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
405
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
406
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
407
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
408
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
409
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
410
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 34 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 6017+000 AL 6030+000
411
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
412
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
413
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
414
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
415
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
416
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
417
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
418
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
419
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
420
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
421
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
422
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
423
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
424
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
425
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
426
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 35 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 6036+800– 6067+000
427
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
428
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
429
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
430
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
431
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
432
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
433
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
434
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
435
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
436
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
437
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
438
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
439
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
440
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
441
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
442
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
443
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
444
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
445
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
446
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
447
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
448
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
449
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
450
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
451
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
452
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
453
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
454
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
455
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
456
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
457
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6.1.3. Cálculo de acarreos para sub‐balasto
A continuación, se presentan los cálculos en las siguientes tablas del cálculo del acarreo del material
para la construcción de la capa de sub‐balasto.
458
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 36 CÁLCULO DE ACARREOS DE SUB‐BALASTO DEL TRAMO [ADMINISTRADOR]
459
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
460
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
461
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
462
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
463
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
464
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
465
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
466
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
467
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
468
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
469
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
470
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
471
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
472
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
473
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
474
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
475
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
476
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
477
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
478
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
479
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
480
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
481
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
482
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
483
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
484
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
485
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
486
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
487
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
488
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
489
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
490
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
491
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
492
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
493
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
494
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
495
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
496
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
497
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
498
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
499
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
500
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
501
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
502
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
503
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
504
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 37 CÁLCULO DE ACARREOS DE SUB‐BALASTO DEL TRAMO 5071+500 – 6006+000
505
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
506
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
507
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
508
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
509
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
510
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
511
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
512
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
513
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
514
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
515
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 38 CÁLCULO DE ACARREOS DE SUB‐BALASTO DEL TRAMO 6017+000 AL 6030+000
516
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
517
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
518
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
519
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
520
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
521
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
522
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
523
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
524
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
525
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
526
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
527
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
528
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
529
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
530
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
531
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
532
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 39 CÁLCULO DE ACARREOS DE SUB‐BALASTO DEL TRAMO 6036+800– 6067+000
533
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
534
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
535
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
536
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
537
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
538
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
539
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
540
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
541
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
542
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
543
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
544
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
545
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
546
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
547
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
548
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
549
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
550
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
551
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
552
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
553
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
554
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
555
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
556
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
557
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
558
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
559
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
560
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
561
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
562
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
563
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6.1.4. Cálculo de acarreos para balasto
A diferencia de las terracerías, el cálculo de la sección de balasto se diferenció en vía principal y vías
secundarías siendo estas últimas los laderos, culatones (colas de maniobra), vía izquierda y/o
derecha de estaciones, etc.
A continuación, se presentan los cálculos en las siguientes tablas para el acarreo del material para
la construcción de la capa de balasto.
564
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 40 CÁLCULO DE ACARREOS DE BALASTO VÍA PRINCIPAL DEL TRAMO [ADMINISTRADOR]
565
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
566
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
567
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
568
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
569
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
570
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
571
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
572
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
573
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
574
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
575
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
576
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
577
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
578
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
579
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
580
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
581
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
582
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
583
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
584
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
585
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
586
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
587
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
588
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
589
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
590
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
591
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
592
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
593
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
594
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
595
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
596
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
597
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
598
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
599
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
600
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
601
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
602
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
603
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
604
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
605
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
606
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
607
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
608
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
609
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
610
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
611
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
612
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
613
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
614
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
615
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
616
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
617
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 41 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 5007+000
618
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
619
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
620
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
621
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
622
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
623
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
624
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 42 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 5043+000
625
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
626
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
627
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 43 CÁLCULO DE ACARREOS DE BALASTO DE ESTACIÓN MAXCANU VÍA DERECHA
628
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
629
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 44 CÁLCULO DE ACARREOS DE BALASTO DE ESTACIÓN MAXCANU VÍA IZQUIERDA
630
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
631
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
632
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
633
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 45 CÁLCULO DE ACARREOS DE BALASTO DE CULATÓN DERECHO
634
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 46 CÁLCULO DE ACARREOS DE BALASTO DE CULATÓN IZQUIERDO
635
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
636
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 47 CÁLCULO DE ACARREOS DE BALASTO DEL TRAMO 5071+500 – 6006+000
637
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
638
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
639
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
640
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
641
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
642
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
643
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
644
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
645
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
646
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
647
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 48 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 5073+000
648
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
649
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 49 CÁLCULO DE ACARREOS DE BALASTO DEL TRAMO 6017+000 AL 6030+000
650
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
651
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
652
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
653
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
654
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
655
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
656
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
657
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
658
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
659
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
660
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
661
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
662
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
663
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
664
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
665
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
666
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 50 CÁLCULO DE ACARREOS DE BALASTO DE LA BASE DE MANTENIMIENTO
667
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
668
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
669
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
670
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 51 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 6020+000
671
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
672
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
673
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
674
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
675
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
676
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
677
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 52 CÁLCULO DE ACARREOS DE BALASTO DEL TRAMO 6036+800– 6067+000
678
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
679
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
680
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
681
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
682
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
683
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
684
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
685
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
686
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
687
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
688
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
689
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
690
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
691
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
692
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
693
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
694
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
695
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
696
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
697
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
698
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
699
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
700
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
701
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
702
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
703
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
704
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
705
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
706
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
707
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
708
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
709
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
710
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
711
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
712
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 53 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 6040+000
713
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
714
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
715
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
716
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
717
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
718
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
719
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
720
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
6.1.5. Cálculo de acarreos para rellenos de zonas encharcables
A continuación, se presentan los cálculos en las siguientes tablas para el acarreo del material para
la construcción de la capa de relleno en zonas encharcables
TABLA 54 CÁLCULO DE ACARREOS DE BALASTO VÍA PRINCIPAL DEL TRAMO 6017+000 AL 6030+000
721
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
722
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
723
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
724
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
725
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
726
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
727
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
728
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
729
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
730
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
731
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 55 CÁLCULO DE ACARREOS DE BALASTO VÍA PRINCIPAL DEL TRAMO 6036+800– 6067+000
732
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
733
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
734
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
735
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
736
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
737
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
738
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
739
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
740
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
741
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
742
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
743
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
744
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
745
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
746
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
747
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
748
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
749
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
750
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
751
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
752
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
753
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
754
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
755
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
756
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
757
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
758
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
759
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
760
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
761
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
762
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
763
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
764
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
765
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
766
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
7. PROCEDIMIENTO CONSTRUCTIVO
7.1. SECUENCIA CONSTRUCTIVA
7.1.1. Desmonte
7.1.1.1. Trabajos previos
Visita de inspección
Previamente al inicio de los trabajos, se realizará una visita de inspección para programarlos y
determinar el tipo de equipo que se requiere de acuerdo con las características de la vegetación.
Delimitación de las zonas de desmonte
En el caso de carreteras, el desmonte se hará en el derecho de vía según lo establecido en el
Proyecto.
En canales, contracunetas, el desmonte se hará en la superficie limitada por las líneas trazadas a lo
largo de los ceros de éstas.
En el caso de zonas de bancos u otras fuera del derecho de vía, el desmonte se hará por lo menos
hasta un (1) metro fuera del límite de dichas zonas.
Trasplante de tierras vegetales
Previamente o durante el desmonte, si así lo indica el Proyecto, se realizará el trasplante de los
individuos vegetales, según lo indicado en la norma N‐CTR‐CAR‐1‐09‐003, “Trasplante de Especies
Vegetales”, trasladándolos a los sitios que señale el proyecto.
7.1.1.2. Trabajo a realizar
Los trabajos se realizarán asegurando de que todo el material vegetal quede fuera de las zonas
destinadas a la construcción, evitando dañar árboles fuera del área indicada en el proyecto.
Salvo la indicación del Proyecto el desenraice se ejecutará, por lo menos, dentro de las superficies
limitadas por líneas trazadas a lo largo de los ceros de cortes, terraplenes con espesor menor de un
(1) metro, canales, contracunetas y zonas de bancos, entre otras.
El proyecto indicará los árboles o arbustos que deben respetarse, tomándose las medidas necesarias
para no dañarlos y únicamente se cortarán las ramas que queden a menos de ocho (8) metros sobre
la corona de la carretera, procurando conservar la simetría y buena apariencia del árbol. En
cualquier caso, se respetarán los árboles y la vegetación adyacente a cuerpos de agua.
767
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
7.1.2. Despalme
7.1.2.1. Trabajos previos
Visita de inspección
Previamente al inicio de los trabajos, se realizará una visita de inspección para programarlos y
determinar el tipo de equipo que se requiere de acuerdo con las características del material de
despalme.
Delimitación de las zonas de despalme
Previo al inicio del despalme y una vez ejecutado el desmonte como se indica en la norma N‐CTR‐
CAR‐1‐01‐001, Desmonte, se delimitará la zona de despalme de acuerdo con lo indicado en el
proyecto.
Trasplante de tierras vegetales
Previamente o durante el desmonte, si así lo indica el Proyecto, se realizará el trasplante de los
individuos vegetales, según lo indicado en la norma N‐CTR‐CAR‐1‐09‐003, “Trasplante de Especies
Vegetales”, trasladándolos a los sitios que señale el proyecto.
7.1.2.2. Trabajo a realizar
El espesor del despalme será el que indique el proyecto a la vista de los materiales existentes en el
lugar, de acuerdo con la estratigrafía del terreno o con la existencia de rellenos artificiales.
Salvo indicación del proyecto, el material natural producto del despalme se empleará para el
recubrimiento de los taludes de terraplenes, así como de los pisos, fondo de las excavaciones y
taludes de los bancos al término de su explotación, o se distribuirá uniformemente en áreas donde
no impida el drenaje o que no invada cuerpos de agua, para favorecer el desarrollo de vegetación,
según lo indique el proyecto.
Salvo indicación del proyecto, al material producto del despalme colocado en taludes de
terraplenes, así como en los pisos, fondo de las excavaciones y taludes d ellos bancos o en las zonas
en donde se distribuyó uniformemente, se le adicionarán semillas de pasto o de vegetación propia
de la zona, adecuada al paisaje y que no impidan la buena visibilidad, según lo indique el proyecto
y de acuerdo con la norma N‐CTR‐CAR‐1‐09‐002, “Plantación y Siembra de Especies Vegetales”.
El retiro de rellenos artificiales se ejecutará cumpliendo con las leyes y reglamentos de protección
ecológica vigentes.
768
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
7.1.3. Corte
7.1.3.1. Trabajos previos
Desmonte
Previo al inicio de los trabajos, la zona por cortar estará debidamente desmontada, considerando lo
señalado en la Norma N‐CTR‐CAR‐1‐01‐001, “Desmonte”.
Delimitación de la zona de corte
Una vez terminado el desmonte se delimitará la zona de corte mediante estacas en las líneas de
ceros, de acuerdo a lo indicado en el proyecto.
Despalme
Si el producto del corte se destina a la formación de terraplenes, previo al inicio de los trabajos, la
zona delimitada para corte estará debidamente despalmada, considerando lo expuesto en la Norma
N‐CTR‐CAR‐1‐01‐002, “Despalme”.
7.1.3.2. Trabajos a realizar
Los cortes se ejecutarán de acuerdo con las líneas de proyecto y sin alterar las áreas fuera de los
límites de la construcción, indicados por las líneas de ceros en el proyecto.
Los cortes se ejecutarán de manera que se permita el drenaje natural.
Los cortes se ejecutarán con el talud establecido en el proyecto. En caso de que los materiales de
los taludes resulten fragmentados o la superficie irregular o inestable, el material en estas
condiciones será removido.
Cuando se requiera el uso de explosivos, se evitará aflojar el material de los taludes más allá de la
superficie teórica establecida en el proyecto.
Si así lo indica el proyecto, los materiales producto del corte se emplearán para construir terraplenes
o arroparlos reduciendo la inclinación de sus taludes. Los materiales provenientes de derrumbes o
deslizamientos recientes se retirarán del sitio de los trabajos para aprovecharse en el abatimiento
de taludes o se depositarán, al igual que el material sobrante de los cortes, en el sitio y forma que
indique el proyecto, para evitar alteraciones del paisaje, a cuerpos de agua y favorecer el desarrollo
de vegetación, así como para no obstaculizar el drenaje natural.
Las cunetas se construirán de forma que su desagüe no cause perjuicio a los cortes ni a los
terraplenes, considerando lo señalado en la Norma N‐CTYR‐CAR‐1‐03‐003, “Cunetas”.
Salvo indicación del proyecto, las contracunetas se harán antes o simultáneamente con los cortes,
considerando lo señalado en la Norma N‐CTR‐CAR‐1‐03‐004, “Contracunetas”.
769
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
7.1.4. Terraplenes
7.1.4.1. Trabajos previos
Delimitación de terraplén
Se delimitará la zona de desplante del terraplén mediante estacas u otras referencias, de acuerdo a
lo indicado en el proyecto.
Desmonte y despalme
Previo al inicio d ellos trabajos, la zona de desplante del terraplén estará debidamente desmontada,
considerando lo señalado en la Norma N‐CTR‐CAR‐1‐01‐001, “Desmonte”. Cuando así lo establezca
el proyecto, se despalmará de acuerdo con lo señalado en la Norma N‐CTR‐CAR‐1‐01‐002,
“Despalme”.
Salvo indicación del proyecto, cuando se encuentre material de calidad inaceptable en el área de
desplante del terraplén, el material será sustituido por otro de mejor calidad, para lo cual se abrirá
una caja de la profundidad necesaria como parte del despalme. El proyecto indicará si es necesaria
la compactación del fondo de la caja, de acuerdo con las características del material. La caja se
rellenará con capas compactadas con el material y la compactación que indique el proyecto.
Escalones de liga
Salvo indicación del proyecto, en la ampliación de la corona o tendido de taludes en los que no se
vaya a modificar el ancho de la corona de terraplenes existentes o en trabajos para la elevación de
la subrasante, se excavarán escalones de liga conforme a lo establecido en el proyecto considerando
lo señalado en la Norma N‐CTR‐CAR‐1‐01‐004, Escalones de Liga.
Preparación de la superficie
Salvo indicación del proyecto, antes de iniciar la construcción de los terraplenes, se rellenarán los
huecos resultantes de los trabajos de desmonte y despalme con material compactado, asimismo se
compactará el terreno natural o el despalmado, en el área de desplante, en un espesor mínimo de
veinte (20) centímetros y a una compactación similar a la del terreno natural.
En aquellas zonas en las que el trazo a ejecutar discurra por el trazo actual del FIT, una vez se haya
despalmado y previamente a iniciar el relleno, se procederá a extender el subbalasto y balasto de la
vía existente en la base del terraplén.
7.1.4.2. Tendido y Conformación
Aspectos generales
770
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
El material proveniente de cortes o bancos se descargará sobre la superficie donde se extenderá, en
cantidad prefijada por estación de veinte (20) metros, en tramos que no sean mayores a los que, en
un turno de trabajo, se pueda tender, conformar y compactar o acomodar el material.
En caso de material compactable, éste se preparará hasta alcanzar el contenido de agua de
compactación que indique el proyecto y obtener la homogeneidad en granulometría y humedad,
extendiéndolo parcialmente e incorporándole el agua necesaria para la compactación, por medio
de riegos y mezclados sucesivos, o eliminando el agua excedente.
Siempre que la topografía del terreno lo permita el material se extenderá en capas sucesivas
sensiblemente horizontales en todo el ancho de la sección.
Si así lo indica el proyecto, cuando la topografía del terreno presente lugares inaccesibles donde no
sea posible la construcción por capas compactadas o acomodadas utilizando equipo mayor, dichos
lugares se rellenarán a volteo para formar una plantilla en la que se pueda operar el equipo,
prosiguiendo la construcción por capas compactadas de ese nivel en adelante. El nivel de la plantilla
será el que indique el proyecto.
Cuando el nivel de desplante coincida sensiblemente con el nivel freático, se evitará desplantar el
terraplén directamente sobre la superficie saturada, procediendo al abatimiento del nivel freático
o a colocar una primera capa a volteo de espesor suficiente para que soporte al equipo, según
indique el proyecto.
Cuando el proyecto lo indique se asegurará la compactación de los hombros de los terraplenes, para
lo que se construirán con una sección más ancha que la teórica de proyecto, respetando la
inclinación de los taludes señalada en el proyecto, como se muestra en la Figura 9,obteniéndose así
los sobre anchos laterales, con las dimensiones indicadas en el proyecto, en los cuales la
compactación podrá ser menor que la fijada.
771
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
FIGURA 9 SECCIÓN TRANSVERSAL DE UN TERRAPLÉN.
Salvo indicación del proyecto, como parte final del terraplén se construirán la capa subyacente y,
por último, la capa subrogante, como se muestra en la figura 1, con los espesores, materiales y
grados de compactación que establezca el proyecto.
Cuando el proyecto indique que la construcción de la capa subrasante se ejecute directamente bajo
el nivel del piso de un corte y los materiales en ese sitio satisfacen las características establecidas
en el apartado 5 de la presente Instrucción de Trabajo, dicha capa se formará sin necesidad de una
excavación adicional, escarificando y compactando la cama del corte, con el espesor y grado de
compactación que establezca el proyecto.
Tendido y conformación de material compactable
Para el cuerpo del terraplén, la capa subyacente y a la capa subrasante, el material compactable se
extenderá en todo el ancho del terraplén, en capas sucesivas, con un espesor no mayor que aquel
que el equipo sea capaz de compactar al grado indicado en el proyecto, como se indica en el
apartado 9.4
Compactación de la presente Instrucción de Trabajo, y se conformará de tal manera que se obtenga
una capa de material sin compactar de espesor uniforme.
Para la ampliación de las coronas o el tendido de los taludes de terraplenes existentes y previamente
excavados los escalones de liga en los taludes, de acuerdo con lo indicado en la Norma N‐CTR‐CAR‐
772
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
1‐01‐004, Escalones de Liga, el material compactable se extenderá en todo el ancho de la ampliación
y se conformará como se indica en el párrafo anterior.
7.1.4.3. Compactación o acomodo
Compactación
Cada capa de material compactable, tendida y conformada como se indica en el inciso 9.3.2 de esta
Instrucción de Trabajo, se compactará hasta alcanzar el grado indicado en el proyecto.
La compactación se hará longitudinalmente, de las orillas hacia el centro de las tangentes y del
interior al exterior en las curvas, con un traslape de cuando menos la mitad del ancho del
compactador en cada pasada.
Acomodo de material no compactable
Cada capa de material no compactable, tendida y conformada como se indica en el inciso 9.3.3 de
la presente Instrucción de Trabajo, se acomodará mediante bandeo, ronceando un tractor montado
sobre orugas, que tenga una masa mínima de treinta y seis (36) toneladas, de forma que pase
cuando menos tres (3) veces por cada sitio. El número de pasadas podrá ser ajustado en la obra,
dependiendo del equipo que se utilice
El bandeo se hará longitudinalmente, de las orillas hacia el centro en las tangentes y del interior al
exterior en las curvas, con un traslape de cuando menos la mitad del tractor en cada franja bandeada
7.2. MAQUINARIA
La maquinaría a utilizar de manera enunciativa más nunca limitativa se enlista en la Tabla 56.
Cabe mencionar que la cantidad de maquinaría será la acorde al procedimiento constructivo
mencionado en el apartado SECUENCIA CONSTRUCTIVA y será siempre la suficiente para abastecer
todos los frentes de obra propuestos.
773
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
TABLA 56 MAQUINARÍA PARA CONSTRUCCIÓN DE TERRACERÍAS
Maquinaria Uso
Retroexcavadora Excavaciones de poca profundidad y carga de material extraído.
Excavadora Excavación de mayor profundidad, corte en taludes y carga de material a camión.
Camiones para Vehículos para el acarreo del material producto de excavación y el material de
acarreo aportación.
Cargador Frontal Carga de material en distancias cortas.
Motoniveladora Conformación de capas de terraplén, subrasante, transición, sub‐balasto y balasto.
Motoescrepa Cargar, transportar y verter el material suelto.
Balastera Serie de vagones usados para transportar y distribuir balasto después de haber
colocado durmientes y rieles
Bateadora Nivelación y alineación de la vía, dotada de bates vibrantes que se introducen en la
capa de balasto y lo vibran enérgicamente bajo los durmientes para dotar a la vía
de una posición exacta en planta y alzado
774
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
8. VOLÚMENES GENERADOS
A continuación, se presentan los volúmenes generados por subtramos y para los materiales en
estudio.
TABLA 57 RESUMEN DE VOLÚMENES GENERADOS DEL TRAMO 3
Corte Relleno Relleno para
Subyacen
Balasto Sub‐balasto Subrasante Corte material Relleno material del zonas Despalme Desmonte
te
Subtramo Cadenamiento del FIT FIT encharcables
(m3) (m3) (m3) (m3) (m3) (m3) (m3) (m3) (m3) (m3) (ha)
TRAMO 1 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
5000 + 000 –
TRAMO 2 98,771.90 129,555.10 190,943.07 15,454.10 148,691.6 835,819.10 148,691.61 0.00 0.00 210,083.70 70.82
5043+000
TRAMO 3 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
TRAMO 4 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
5071+500 –
TRAMO 5 19,048.60 25,867.10 38,082.35 1,737.50 0.00 298,846.20 0.00 0.00 0.00 44,699.70 14.46
6006+000
TRAMO 6 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
6017+000 AL
TRAMO 7 43,145.90 49,060.90 71,127.47 1,506.00 25,503.68 473,969.10 25,503.68 8,823.50 34,950.40 90,431.50 25.72
6030+000
TRAMO 8 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
6036+800– 139,507.8
TRAMO 9 136,310.50 195,020.50 9,459.10 0.00 726,949.30 0.00 21,216.20 87,101.30 191,348.00 61.40
6067+000 0
TRAMO 10 VARIANTE ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Ladero
5007+720 3,833.10 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
5007
Ladero
5043+390 1,022.10 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
5043
Maxcanú
990.10 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
derecha
Maxcanú
1,390.70 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
izquierda
Maxcanú
culatón 850.60 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
derecho
Maxcanú
culatón 849.50 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
izquierdo
Ladero
5073+080 3,832.60 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
5073
Via Aux BM 1,187.30 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Ladero
6020+500 3,833.20 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
6020
Ladero
6040+680 4,375.40 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
6040
TOTAL= 322,638.80 340,793.60 495,173.39 28,156.70 174,195.29 2,335,583.70 174,195.29 30,039.70 122,051.70 536,562.90 172.39
775
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
En la tabla anterior, en las vías auxiliares, laderos y estaciones, se puede observar que todas las
cantidades excepto el balasto, aparecen como un guión (‐), esto es porque ya se ha considerado en
la volumetría de cada uno de los tramos.
9. CONCLUSIONES Y RECOMENDACIONES
La zona atravesada por el tramo 3 del Tren Maya constituye hidrogeológicamente una
cuenca criptorreica en donde el agua de pluviometría es rápidamente infiltrada por el
terreno, no existiendo una escorrentía superficial continua.
La hidrogeología subterránea está constituida por un acuífero complejo en el que interviene
la karstificación del macizo rocoso, la acumulación de agua en zonas de suelos residuales
granulares, y la existencia de zonas de fallas y fracturas que constituyen un acuífero
secundario asociado a los otros dos acuíferos, y son la principal causa de la infiltración del
agua superficial hacia el subsuelo.
El espesor de la capa de balasto y sub‐balasto será de 30 cm y 30 cm respectivamente. El
análisis y diseño de estos concluyen que con ese arreglo de espesores es más que suficiente
para las cargas y condiciones estudiadas.
Se incluyen en este documento las tablas con las recomendaciones geotécnicas que se
usarán para la construcción de la curva‐masa y las observaciones correspondientes
Se definen los lineamientos generales del procedimiento constructivo para las terracerías,
así como la actuación del recubrimiento vegetal de taludes.
Se presenta un resumen de los volúmenes generados por los movimientos de tierras.
Se presentan los bancos de materiales que, derivado el análisis realizado por laboratorios
certificados, han arrojado que su material es aprovechable pata terraplén, subrasante y sub‐
balasto. Además, se han presentado únicamente los bancos a los cuales se pudo tener
acceso.
Este informe de Terracerías implica los alcances de un Proyecto ejecutivo, sin embargo, no
es limitativo. Cualquier cambio de variantes como, tipo de material rodante, cambio de
trazado, variantes topográficas, entre otros, serán causa de modificaciones al proyecto y sus
movimientos de tierras.
776
INFORME DE TERRACERÍAS
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA
ANEXO 1: FICHAS DE BANCOS DE MATERIALES
ANEXO 2: RESUMEN DE ANÁLSIS DE LOS MATERIALES
ANEXO 3: ACTAS DE ENSAYOS DE LABORATORIO
777