INFORME 

DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

INFORME DE TERRACERÍAS  

PROYECTO: 

PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

CIUDAD DE MÉXICO 

MARZO 2021 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

CONTROL DE DOCUMENTACIÓN 

Nº  Emisor  Título del documento  Versión  Revisión  Fecha 


1  Azvindi/Proyeco/GOC  TMPE‐3‐VA‐VIA‐INF‐0006  01  ‐  16/11/2020 
2  Mextypsa / SENER  P0M10146‐T3‐TRA‐INF‐0008_02  ‐  01  09/12/2020 
3  Azvindi/Proyeco/GOC  TMPE‐3‐VA‐VIA‐INF‐0006  02  ‐  08/03/2021 
 

 
Autor:  
 
 
   
 
  ____________________________ 
Ing.  David Borrego 
 
 
 
 
   


 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

CONTENIDO 
 

CONTROL DE DOCUMENTACIÓN ........................................................................................................ 2 
ÍNDICE DE TABLAS ............................................................................................................................... 6 
ÍNDICE DE FIGURAS ............................................................................................................................. 8 
1.  ANTECEDENTES ........................................................................................................................... 9 
2.  OBJETO ........................................................................................................................................ 9 
3.  UBICACIÓN ................................................................................................................................10 
4.  ESTUDIO GEOTÉCNICO ..............................................................................................................11 
4.1.  GEOLOGÍA GENERAL ......................................................................................................... 11 
4.2.  ESTRATIGRAFÍA Y LITOLOGÍA ............................................................................................ 13 
4.2.1.  Unidad geotécnica U1. Suelo cuaternario cohesivo medio. Arcillas y limos............. 16 
4.2.2.  Unidad  geotécnica  U2.  Suelo  residual  granular  medio.  Arenas  con  algo  de  limos  y 
gravas.  16 
4.2.3.  Unidad geotécnica U3. Suelo residual cohesivo muy duro. ...................................... 16 
4.2.4.  Unidad geotécnica U4. Suelo residual granular muy denso. Arenas con algo de limos 
y gravas.  16 
4.2.5.  Unidad geotécnica U5. Relleno antrópico. ................................................................ 16 
4.2.6.  Unidad geotécnica U6. Calizas coquinas. .................................................................. 16 
4.2.7.  Unidad geotécnica U7. Calizas masivas. .................................................................... 17 
4.3.  MECÁNICA DE SUELOS ...................................................................................................... 17 
4.4.  TRABAJOS REALIZADOS ..................................................................................................... 17 
4.5.  RESUMEN DE DATOS GEOTÉCNICOS ................................................................................. 19 
4.5.1.  Observaciones particulares a las tablas de datos geotécnicos ................................. 61 
4.6.  BANCOS DE MATERIALES .................................................................................................. 62 
5.  DISEÑO ......................................................................................................................................65 
5.1.  CLASIFICACIÓN DE LA VÍA A DISEÑAR ............................................................................... 65 
5.2.  ESPESOR DE TERRAPLÉN ................................................................................................... 66 
5.3.  ESPESOR DE BALASTO Y SUB‐BALASTO ............................................................................. 66 
5.3.1.  Método de cálculo ..................................................................................................... 66 


 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5.3.2.  Conclusiones .............................................................................................................. 66 
5.4.  CARACTERÍSTICAS DE MATERIALES ................................................................................... 66 
5.4.1.  Balasto ....................................................................................................................... 66 
5.4.2.  Sub‐balasto ................................................................................................................ 70 
5.4.3.  Subrasante ................................................................................................................. 72 
5.4.4.  Terraplenes ................................................................................................................ 73 
5.4.5.  Terraplenes en zonas encharcables .......................................................................... 73 
5.5.  CORTES .............................................................................................................................. 74 
5.5.1.  Cortes en zonas de la vía del FIT ............................................................................. 180 
5.6.  REVEGETACIÓN DE TALUDES .......................................................................................... 180 
5.7.  ZONAS ENCHARCABLES ................................................................................................... 181 
5.8.  TERRENO NATURAL ......................................................................................................... 182 
5.8.1.  Desmonte ................................................................................................................ 182 
5.8.2.  Despalme ................................................................................................................. 182 
6.  CURVA MASA, ACARREOS Y DESPERDICIOS ........................................................................... 190 
6.1.  CÁLCULOS DE PRÉSTAMOS Y DESPERDICIOS .................................................................. 190 
6.1.1.  Cálculo de acarreos para terraplén ......................................................................... 191 
6.1.2.  Cálculo de acarreos para subrasante ...................................................................... 307 
6.1.3.  Cálculo de acarreos para sub‐balasto ..................................................................... 458 
6.1.4.  Cálculo de acarreos para balasto ............................................................................ 564 
6.1.5.  Cálculo de acarreos para rellenos de zonas encharcables ...................................... 721 
7.  PROCEDIMIENTO CONSTRUCTIVO ......................................................................................... 767 
7.1.  SECUENCIA CONSTRUCTIVA ............................................................................................ 767 
7.1.1.  Desmonte ................................................................................................................ 767 
7.1.2.  Despalme ................................................................................................................. 768 
7.1.3.  Corte ........................................................................................................................ 769 
7.1.4.  Terraplenes .............................................................................................................. 770 
7.2.  MAQUINARIA .................................................................................................................. 773 
8.  VOLÚMENES GENERADOS ...................................................................................................... 775 


 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

9.  CONCLUSIONES Y RECOMENDACIONES ................................................................................. 776 
ANEXO 1: FICHAS DE BANCOS DE MATERIALES ............................................................................. 777 
ANEXO 2: RESUMEN DE ANÁLSIS DE LOS MATERIALES ................................................................. 777 
ANEXO 3: ACTAS DE ENSAYOS DE LABORATORIO .......................................................................... 777 
 
   


 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

ÍNDICE DE TABLAS 

Tabla 1 Subtramos del proyecto del Tramo 3 del Tren Maya ............................................................. 9 
Tabla 2 Estudios geotécnicos realizados por subtramo. .................................................................. 17 
Tabla 3 Resumen de datos geotécnicos del tramo [Administrador] ................................................. 19 
Tabla 4 Resumen de datos geotécnicos del tramo 5071+500 – 6006+000 ..................................... 39 
Tabla 5 Resumen de datos geotécnicos del tramo 6017+000 AL 6030+000 ................................... 44 
Tabla 6 Resumen de datos geotécnicos del tramo 6036+800– 6067+000 ...................................... 51 
Tabla 7 Bancos de préstamo para el Tramo 3 .................................................................................. 63 
Tabla 8 Criterios de diseño ............................................................................................................... 65 
Tabla 9 Valores recomendados para pruebas de balasto. PROY-NOM-003-ARTF-2018 y AREMA
2020................................................................................................................................................... 67 
Tabla 10 Valores propuestos para material del balasto. Manual de calidad para materiales .......... 68 
Tabla 11 Graduación de balasto recomendada. AREMA 2020 ........................................................ 69 
Tabla 12 Características del material a usar en la capa de sub-balasto. Manual De Calidad De Los
Materiales .......................................................................................................................................... 70 
Tabla 13 Características del material a usar en la capa de sub-balasto. Especificación técnica
fonatur ............................................................................................................................................... 72 
Tabla 14 Características del material a usar en la capa de subrasante. Manual de CAlidad de los
materiales .......................................................................................................................................... 72 
Tabla 15 Característica de los terraplenes. manual de calidad de los materiales. ........................... 73 
Tabla 16 Característica de los terraplenes en zonas encharcables. manual de calidad de los
materiales y ADIF. ............................................................................................................................. 74 
Tabla 17 Volumen de corte para el tramo del [Administrador].......................................................... 74 
Tabla 18 Volumen de corte para el tramo del 5071+500 – 6006+000............................................ 121 
Tabla 19 Volumen de corte para el tramo del 6017+000 AL 6030+000 ......................................... 131 
Tabla 20 Volumen de corte para el tramo del 6036+800– 6067+000............................................. 147 
Tabla 21 Espesor de despalme del [Administrador] ....................................................................... 182 
Tabla 22 Espesor de despalme del 5071+500 – 6006+000 ........................................................... 185 
Tabla 23 Espesor de despalme del tramo 6017+000 AL 6030+000............................................... 186 
Tabla 24 Espesor de despalme del tramo 6036+800– 6067+000 .................................................. 188 
Tabla 25 Cálculo de curva masa del tramo del [Administrador] ..................................................... 191 
Tabla 26 Cálculo de curva masa del tramo del 5071+500 – 6006+000 ......................................... 244 
Tabla 27 Cálculo de curva masa del tramo del 6017+000 AL 6030+000 ....................................... 255 
Tabla 28 Cálculo de curva masa del tramo del 6036+800– 6067+000 .......................................... 272 
Tabla 29 Cálculo de acarreos de subrasante del tramo [Administrador] ........................................ 307 
Tabla 30 Cálculo de acarreos de subrasante del tramo 5071+500 – 6006+000 ............................ 360 
Tabla 31 Cálculo de acarreos de subrasante del tramo 5043+000 – 5051+000 ............................ 371 
Tabla 32 Cálculo de acarreos de subrasante del tramo 5051+000 – 5070+000 ............................ 380 
Tabla 33 Cálculo de acarreos de subrasante del tramo 5070+000 – 6005+000 ............................ 402 
Tabla 34 Cálculo de acarreos de subrasante del tramo 6017+000 AL 6030+000 ......................... 411 
Tabla 35 Cálculo de acarreos de Subrasante del tramo 6036+800– 6067+000 ........................... 427 
Tabla 36 Cálculo de acarreos de sub-balasto del tramo [Administrador] ....................................... 459 
Tabla 37 Cálculo de acarreos de sub-balasto del tramo 5071+500 – 6006+000 ........................... 505 
Tabla 38 Cálculo de acarreos de sub-balasto del tramo 6017+000 AL 6030+000......................... 516 
Tabla 39 Cálculo de acarreos de sub-balasto del tramo 6036+800– 6067+000 ............................ 533 
Tabla 40 Cálculo de acarreos de balasto vía principal del tramo [Administrador] .......................... 565 
Tabla 41 Cálculo de acarreos de balasto del ladero 5007+000...................................................... 618 
Tabla 42 Cálculo de acarreos de balasto del ladero 5043+000...................................................... 625 
Tabla 43 Cálculo de acarreos de balasto de estación maxcanu vía derecha ................................ 628 
Tabla 44 Cálculo de acarreos de balasto de estación maxcanu vía izquierda ............................... 630 
Tabla 45 Cálculo de acarreos de balasto de culatón derecho ........................................................ 634 


 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Tabla 46 Cálculo de acarreos de balasto de culatón izquierdo ...................................................... 635 


Tabla 47 Cálculo de acarreos de balasto del tramo 5071+500 – 6006+000 .................................. 637 
Tabla 48 Cálculo de acarreos de balasto del ladero 5073+000...................................................... 648 
Tabla 49 Cálculo de acarreos de balasto del tramo 6017+000 AL 6030+000 ................................ 650 
Tabla 50 Cálculo de acarreos de balasto de la base de mantenimiento ........................................ 667 
Tabla 51 Cálculo de acarreos de balasto del ladero 6020+000...................................................... 671 
Tabla 52 Cálculo de acarreos de balasto del tramo 6036+800– 6067+000 ................................... 678 
Tabla 53 Cálculo de acarreos de balasto del ladero 6040+000...................................................... 713 
Tabla 54 Cálculo de acarreos de balasto vía principal del tramo 6017+000 AL 6030+000 ........... 721 
Tabla 55 Cálculo de acarreos de balasto vía principal del tramo 6036+800– 6067+000 ............... 732 
Tabla 56 Maquinaría para construcción de terracerías .................................................................. 774 
Tabla 57 Resumen de volúmenes generados del Tramo 3 ............................................................ 775 
 

   


 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

ÍNDICE DE FIGURAS 

Figura 1 Mapa geológico general de la Península de Yucatán donde se muestra el eje del tramo 3
........................................................................................................................................................... 12 
Figura 2 Columna estratigráfica general para el tramo 3, con base en la carta geológico-minera
Mérida F16-10 ................................................................................................................................... 15 
Figura 3 Granulometría balasto. Manual de calidad para materiales ............................................... 69 
Figura 4Curvas granulométricas para Sub-Balasto. Manual de calidad para materiales. ................ 71 
Figura 5 Sección transversal de zonas donde interactúa la línea del FIT con el trazado del Tramo 3
......................................................................................................................................................... 180 
Figura 6 Propuesta de revegetación de taludes ............................................................................. 181 
Figura 7 Sección tipo de terraplén en zonas encharcables ............................................................ 182 
Figura 8 Ejemplo de gráfica de Ordenada Curva Masa. Manual de Proyecto Geométrico de
Carreteras 2018............................................................................................................................... 191 
Figura 9 Sección transversal de un terraplén. ................................................................................ 772 
   


 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

1. ANTECEDENTES 

El  Gobierno  Mexicano,  como  parte  del  Plan  Nacional  de  Desarrollo  2019‐2024,  contempla  la 
implementación  del  Tren  Maya  como  el  proyecto  más  importante  de  infraestructura,  desarrollo 
socioeconómico y turismo de dicho sexenio. 
 
Para  ello,  el  Fondo  Nacional  de  Fomento  al  Turismo  (FONATUR),  institución  encargada  para  la 
preparación  e  implementación  del  proyecto,  adjudicó  en  mayo  de  2020,  al  Consorcio  AZVINDI  a 
través de la licitación pública internacional LO‐021W3N003‐E60‐2020 el tramo III del Tren Maya que 
discurre entre Calkiní e Izamal. 
 
El proyecto completo se divide en 7 tramos y consiste en la implementación de un ferroriel para la 
prestación de servicios de transporte de pasajeros y de mercancías interconectando cinco entidades 
federativas al sureste de México: Yucatán, Quintana Roo, Campeche, Tabasco y Chiapas. La longitud 
total del proyecto es de 1452 km. 
 
El tramo 3 objeto del presente contrato, discurre entre las localidades de Calkiní e Izamal, con una 
longitud de línea principal aproximada de 157,2 km. Este a su vez se puede dividir en dos (2) grandes 
subtramos, el primero con origen en Calkiní hasta el P.K. 6003+000 y el segundo con origen en el 
P.K. 6003+000 hasta Izamal.  
 
El  presente  documento  TMPE‐3‐VA‐VIA‐INF‐0006  comprende  los  estudios  del  proyecto  de 
terracerías  del  Tramo  3  del  Tren  Maya,  por  lo  que  atiende  los  comentarios  emitidos  por  la 
Supervisión a los documentos relativos a los bancos de materiales TMPE‐3‐VA‐GEO‐INF‐BMAT‐0001 
(PK5000+000  –  5072+788)  y  TMPE‐3‐VA‐GEO‐INF‐BMAT‐0002  (PK6018+000  –  6030+000),  en  los 
respectivos  informes  de  revisión  P0M10146‐T3‐GEO‐INF‐0021_00  y  P0M10146‐T3‐GEO‐INF‐
0027_00. 

2. OBJETO 

El  objetivo  de  este  documento  es  presentar  los  cálculos,  criterios  de  diseño  y  consideraciones 
tomadas para el proyecto Ejecutivo de terracerías de los tramos no condicionados por variantes del 
proyecto. 
 
Los tramos no condicionados están divididos en los cadenamientos indicados en la Tabla 1. 
 
TABLA 1 SUBTRAMOS DEL PROYECTO DEL TRAMO 3 DEL TREN MAYA 

TRAMO  CADENAMIENTO INICIAL 

TRAMO 1  VARIANTE 


 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TRAMO 2  [Administrador] 

TRAMO 3  VARIANTE 

TRAMO 4  VARIANTE 

TRAMO 5  5071+500 – 6006+000 

TRAMO 6  VARIANTE 

TRAMO 7  6017+000 AL 6030+000

TRAMO 8  VARIANTE 

TRAMO 9  6036+800– 6067+000 

TRAMO 10  VARIANTE 

3. UBICACIÓN 

El tramo 3 del proyecto del Tren Maya, con nombre Golfo 2, abarca desde los límites políticos del 
estado  de  Yucatán  con  el  estado  de  Campeche,  al  sur  de  Maxcanú,  y  termina  en  la  cabecera 
municipal de Izamal, comprendiendo una longitud total de 157.2 km. 

En la siguiente imagen se muestra la ubicación del tramo III dentro del trazado general del Tren 
Maya. 

 
FIGURA 4.1. RED DE VÍAS FÉRREAS DE LA LÍNEA MAYAB, COMPAÑÍA DE FERRORIELES CHIAPAS‐MAYAB. EN EL RECUADRO 
ROJO SE INDICA LA LOCALIZACIÓN DEL TRAMO 3. 

10 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

4. ESTUDIO GEOTÉCNICO 

4.1. GEOLOGÍA GENERAL 
El tramo estudiado se encuentra sobre la provincia geológica Plataforma de Yucatán. La geología de 
esta  plataforma  está  dominada  por  sedimentos  calcáreos  que  se  han  depositado  de  manera 
ininterrumpida desde el Paleoceno, por lo que en superficie sólo se observan depósitos cenozoicos. 
La Plataforma de Yucatán comprende los estados de Yucatán, Campeche, Quintana Roo, Tabasco y 
Chiapas, y se extiende costa afuera hacia la plataforma continental del Golfo de México y del Caribe. 
El tramo de estudio se ubica dentro de las cartas geológico‐mineras Mérida F16‐10 y Calkiní F15‐9‐
12 y su columna general incluye, en orden ascendente, a las formaciones Icalché y Chichén Itzá (del 
Paleoceno‐Eoceno);  una  unidad  del  Oligoceno;  las  Formaciones  Bacalar,  Estero  Franco  y  Riello 
Puerto (Mioceno superior‐Plioceno) y calizas de moluscos del Pleistoceno‐Holoceno.  

La  Plataforma  de  Yucatán  tiene  un  basamento  cristalino  pre‐Mesozoico  documentado  mediante 
pozos de exploración profunda de Pemex (López‐Ramos, 1973). En el pozo Yucatán no. 1 se encontró 
una riolita porfídica a 3200 m de profundidad fechada en el Silúrico y en el pozo Yucatán no. 4 se 
encontró una cuarcita metamorfoseada subyaciendo a los equivalentes de lechos rojos del Triásico‐
Jurásico.  Dado  que  la  Plataforma  de  Yucatán  es  un  bloque  sin  perturbaciones  estructurales,  el 
Cretácico tampoco se encuentra expuesto y sólo se ha identificado con los pozos de exploración 
(López‐Ramos,  1973).  Estos  depósitos  están  compuestos  por  anhidritas,  calizas,  dolomitas  e 
intercalaciones de bentonitas y material piroclástico. Hacia la base de la sección se han reconocido 
evaporitas  del  Cretácico  Inferior;  mientras  que  el  Cretácico  Superior  y  en  el  Cenozoico  están 
representados por bancos calcáreos (Morán‐Zenteno, 1994). Estos depósitos del Cretácico Superior 
corresponden con facies marinas someras de laguna restringida y tras‐arrecife y carece de facies 
marinas profundas. 

11 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
FIGURA 1 MAPA GEOLÓGICO GENERAL DE LA PENÍNSULA DE YUCATÁN DONDE SE MUESTRA EL EJE DEL TRAMO 3 

Los  depósitos  cenozoicos  de  la  plataforma  están  representados  por  secuencias  calcáreas  y 
dolomíticas  con  intercalaciones  de  evaporitas.  El  Paleoceno  inferior‐Eoceno  indiferenciado  está 
representado por calizas cristalinas, silicificadas o recristalizadas, y dolomitas con pedernal negro 
secundario, pertenecientes a la Formación Icaiché. Estos depósitos afloran al sur de la península. 

El  Eoceno  inferior‐medio  está  representado  por  la  Formación  Chichén  Itzá  (TeCz‐Mg),  la  cual 
consiste  en  calizas  microcristalinas  con  estratificación  masiva.  La  mayoría  de  los  afloramientos 
tienen microfauna que sugiere su edad eocénica. El contenido fosilífero, entre los que se encuentran 
foraminíferos y algas, indica un ambiente de poco tirante de agua. Por otro lado, el Eoceno superior 
está representado por el miembro Chumbec, de la Formación Chichén Itzá. Este miembro consiste 
en calizas blancas con textura sacaroidea, las cuales contienen fauna de miliólidos, con lo cual se 
restringe su edad. Su ambiente de depósito es de plataforma somera. 

El Oligoceno se ha reconocido con los pozos de exploración y también en los depósitos explotados 
en  las  cercanías  de  la  ciudad  de  Mérida.  Los  depósitos  del  Oligoceno  inferior  consisten  en 
calcarenitas  de  estratificación  gruesa  (de  1  a  1.5  m),  pobremente  estratificadas,  con  fauna  de 
foraminíferos de ambiente somero. El Oligoceno superior incluye calizas blancas y calcarenitas que 

12 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

se  caracterizan  por  tener  un  gran  número  de  fósiles  de  conchas  de  moluscos  bien  preservados, 
además de foraminíferos de agua somera. 

Cubriendo  a  la  unidad  anterior  se  encuentran  depósitos  del  Mioceno‐Plioceno.  Estos  depósitos 
están representados por calizas blancas cristalinas, coquinas y conglomerados de las formaciones 
Bacalar, Estero Franco y Riello Puerto. Las formaciones Bacalar y Estero Franco afloran en la costa 
sur  de  la  península;  mientras  que  la  Formación  Riello  Puerto  aflora  en  el  norte.  Esta  última  se 
extiende por gran parte de la Península de Yucatán, está representada por coquinas con moluscos 
de  color  gris‐blanco  a  rosado  y  se  caracteriza  por  su  abundante  contenido  fosilífero  de 
foraminíferos, algas y ostrácodos. 

Finalmente,  el  Cuaternario  está  representado  por  depósitos  del  Pleistoceno  conformados  por 
areniscas poco consolidadas, constituidas por fragmentos de gasterópodos, pelecípodos y ostras, y 
calizas  de  moluscos.  Estos  depósitos  afloran  discontinuamente  en  la  margen  oriental  de  la 
Península. Los depósitos del Holoceno incluyen depósitos lacustres, constituidos por arcillas, lodo 
calcáreo, arenas y limos ricos en materia orgánica que afloran en las zonas lagunares; y depósitos 
de limo‐arcillas ricos en materia orgánica de ambiente palustre, los cuales afloran en las márgenes 
de  plataforma.  Finalmente,  los  depósitos  de  litoral  están  representados  por  arenas  blancas  con 
fragmentos de ostras, bivalvos y gasterópodos. 

4.2. ESTRATIGRAFÍA Y LITOLOGÍA 
El subsuelo de la Península de Yucatán está constituido por una secuencia de depósitos calcáreos 
de  origen  marino,  del  Terciario  superior,  la  cual  ha  estado  expuesta  a  subsidencia  continua.  Los 
sedimentos terciarios, presentan echados muy suaves, con un espesor aproximado de 120 metros, 
que corresponden a calizas masivas cristalinas, cavernosas y con una buena permeabilidad. Estas 
calizas  cristalinas  descansan  sobre  calizas  y  margas,  con  espesor  de  cientos  de  metros  y  muy 
impermeables. 

La Península de Yucatán presenta la característica de tener pequeños horizontes de suelo (20 cm 
aprox.)  compuesta  de  calizas  duras  con  proceso  de  disolución  que  cementan  fragmentos  de 
sedimentos calcáreos y conchas (González; 1999). También se presenta una caliza suave y blanca 
denominada sascab (tierras blancas), siendo una característica distintiva del área de estudio. 

El área de estudio comprende un paquete de rocas carbonatadas, que abarcan desde el Cretácico 
al reciente. La unidad más antigua expuesta corresponde a la Formación Chichén‐Itzá (TeCz‐Mg), 
que se divide en dos miembros, el miembro Pisté y el miembro Chumbec. También se encuentra 
presente  la  Unidad  del  Oligoceno  (TeMg‐Lu‐Cl)  y  la  Formación  Riello  Puerto  (TmplCz‐Cq)  del 
Mioceno‐Plioceno. 

13 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Dentro  del  área  en  la  que  se  ubica  el  tramo  de  estudio,  de  acuerdo  con  las  cartas  geológicas 
publicadas por el Servicio Geológico Mexicano (SGM) y la literatura revisada, se pueden definir las 
siguientes litologías por formaciones y unidades:  

‐ Formación Chichén Itzá (TeCz‐Mg). es la unidad más antigua que aflora sobre el tramo 
3.  Constituida  por  un  paquete  de  rocas  carbonatadas,  conformado  por  grainstone, 
wackestone, brecha calcárea y horizontes de margas de edad Eoceno. Se divide en dos 
miembros: 
‐ Miembro Pisté (TeCz‐Mg): de edad del Eoceno Medio, compuesto por calizas 
de  color  blanco  a  amarillento,  a  menudo  masiva  y  con  microfracturas; 
presenta  abundante  microfauna  de  foraminíferos  y  algas  calcáreas.  El 
miembro Pisté se encuentra ampliamente distribuido en la porción central de 
la Península de Yucatán. 
‐ Miembro  Chumbec  (TeCz‐Lu):  corresponde  al  Eoceno  superior  y  está 
constituido  por  calizas  muy  blancas  y  cristalinas  de  aspecto  de  un  mármol 
sacaroideo. Sin embargo, este miembro no se encuentra presente sobre la vía 
del tren. El espesor estimado de este miembro es de 100 m y descansa sobre 
el miembro Pisté. 
‐ Unidad  del  Oligoceno  (TeMg‐Lu‐Cl):  compuesta  por  calizas‐coquinas  que 
cubren  Chichén  Itzá,  comprende  un  paquete  de  mudstone,  grainstone, 
packstone y boundstone. 
‐ Formación  Riello  Puerto  (TmplCz‐Cq).  de  edad  Mioceno‐Plioceno.  Constituida  por 
mudstone, wackestone, grainstone, packstone, boundstone y brechas calcáreas mal 
clasificadas. Esta es la unidad más joven y con mayor presencia en el tramo 3 

14 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
FIGURA 2 COLUMNA ESTRATIGRÁFICA GENERAL PARA EL TRAMO 3, CON BASE EN LA CARTA GEOLÓGICO‐MINERA MÉRIDA 
F16‐10 

Otra  unidad  que  no  está  formalmente  descrita  es  el  material  sascab,  o  “tierra  blanca”  en  maya, 
definido  bibliográficamente  de  dos  maneras.  La  primera  la  define  como  “roca  calcárea  no 
consolidada,  cuya  consistencia  parece  indicar  que  el  lodo  calcáreo  del  cual  procede  se  depositó 
como calcita y, por lo tanto, no ocurrió la cristalización de aragonito a calcita” (Martínez, 2003). La 
segunda definición dice que dicho material ha sido asociado también a la alteración química de rocas 
calizas, tratándose de un suelo o coraza calcárea reblandecida, en un espesor de varios metros. La 
caracterización del “sascab”, de acuerdo a la información levantada en los trabajos de campo se 
define como un material de color blancuzco, areno‐arcilloso al tacto, de tamaño de grano medio a 
fino, que se presenta desde la superficie o intercalado con estratos de roca caliza con variaciones 
laterales y verticales. Al no ser una unidad formalmente descrita, ni de distribución continua, no se 
representa en los mapas, pero se dibuja en las secciones como material arcillo‐arenoso, aunque la 
proporción de material fino (arcilla y limo) y arenas varía de una localidad a otra. 

15 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

De acuerdo con las cartas geológicas del SGM y la información bibliográfica, a lo largo del área de 
estudio afloran tanto la Formación Chichén Itzá, miembro Pisté (TeCz‐Mg) como la Formación Riello 
Puerto (TmplCz‐Cq). 

Derivado  de  los  estudios  realizados  en  campo  se  han  identificado  y  clasificado  las  siguientes 
unidades geotécnicas. 

4.2.1. Unidad geotécnica U1. Suelo cuaternario cohesivo medio. Arcillas y limos.  
Esta unidad geotécnica está constituida principalmente por suelos arcillo arenosos que se localizan 
principalmente en las pequeñas microcuencas cuaternarias intersecadas por el trazo. Presenta un 
espesor reducido, en general inferior a un metro.  

4.2.2. Unidad geotécnica U2. Suelo residual granular medio. Arenas con algo de limos y gravas.  
La unidad  U2 está  constituida por suelos residuales de  naturaleza predominantemente granular, 
producto  de  la  alteración  del  sustrato  rocoso.  Se  localiza  principalmente  en  los  metros  más 
superficiales  y  ocasionalmente  en  profundidad  en  zonas  alteradas  y  reblandecidas  dentro  del 
conjunto de suelos denominados localmente como “sascab”.  

4.2.3. Unidad geotécnica U3. Suelo residual cohesivo muy duro.  
La unidad U3 está constituida por suelos residuales de naturaleza predominantemente cohesiva, 
producto  de  la  alteración  del  sustrato  rocoso.  Se  localiza  principalmente  en  los  metros  más 
superficiales  y  ocasionalmente  en  profundidad  en  zonas  alteradas  y  reblandecidas  dentro  del 
conjunto de suelos denominados localmente como “sascab”.  

4.2.4. Unidad geotécnica U4. Suelo residual granular muy denso. Arenas con algo de limos y 
gravas. 
Esta unidad geotécnica es de naturaleza y composición similar a la unidad U2, pero presenta una 
compacidad muy densa.  

4.2.5. Unidad geotécnica U5. Relleno antrópico. 
Esta  unidad  se  corresponde  con  los  rellenos  antrópicos  utilizados  para  la  construcción  de  la  vía 
ferroviaria  actual.  Se  trata  de  materiales  de  naturaleza  diversa  que  constituyen  el  balasto,  sub‐
balasto y terracería de los terraplenes de la vía existente.  

4.2.6. Unidad geotécnica U6. Calizas coquinas.  
La unidad geotécnica U6 se corresponde con las calizas coquinas medianamente fracturadas que 
presentan disolución. Tienen una textura rugosa y se encuentran moderadamente consolidadas. Sus 
estructuras fosilíferas están, en general, bastante  bien preservada, presentando especímenes de 
hasta 10 cm.  

16 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

4.2.7. Unidad geotécnica U7. Calizas masivas. 
Las calizas masivas de la unidad U7 son más duras, resistentes y competentes que las de la unidad 
U6. Presentan escaso contenido fósil y se encuentran ocasionalmente zonas con recristalización. Se 
observan lentejones arcillosos intercalados entre los paquetes calcáreos.  

Para conocer mayor información sobre la estratigrafía y unidades geotécnicas se puede consultar el 
documento TMPE‐3‐VA‐GEO‐INF‐(número dependiendo el tramo).  

4.3. MECÁNICA DE SUELOS 

4.4. TRABAJOS REALIZADOS 
El estudio geotécnico de los materiales presentes en el tramo se ha realizado mediante la ejecución 
de ensayos tanto intrusivos como no intrusivos y utilizando numerosas técnicas diferentes.  

En el caso de los ensayos intrusivos se han realizado sondeos de muestreo mixto, sondeos de avance 
controlado y pozos a cielo abierto.  

En  cuanto  a  los  ensayos  no  intrusivos,  se  han  utilizado  diferentes  técnicas  geofísicas  como  la 
realización  de  perfiles  de  tomografía  eléctrica  y  barridos  de  georradar,  con  el  fin  de  definir  la 
existencia de cavidades. 

Los estudios realizados en todos los tramos se presentan en la Tabla 2. 

TABLA 2 ESTUDIOS GEOTÉCNICOS REALIZADOS POR SUBTRAMO. 

POZOS 
SONDEOS  ESTACIONES  AVANCE  PERFIL DE  ENSAYOS 
NO.  SUBTRAMO  A CIELO  GEORRADAR  DONWHOLE
MIXTOS  GEOMECÁNICAS CONTROLADO TOMOGRAFÍA PIESOMÉTRICOS
ABIERTO 

1  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

2  [Administrador]  45  115  9  29  23 (12,675 m) 243 m  2  1 

3  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

4  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

5071+500 – 
5  6  22  3  ‐  ‐  ‐  ‐  ‐ 
6006+000 

6  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

6017+000 AL 
7  15  31  1  ‐  ‐  ‐  ‐  ‐ 
6030+000 

17 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

POZOS 
SONDEOS  ESTACIONES  AVANCE  PERFIL DE  ENSAYOS 
NO.  SUBTRAMO  A CIELO  GEORRADAR  DONWHOLE
MIXTOS  GEOMECÁNICAS CONTROLADO TOMOGRAFÍA PIESOMÉTRICOS
ABIERTO 

8  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

6036+800– 
9  14  76  3  ‐  ‐  ‐  ‐  ‐ 
6067+000 

10  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

18 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
 

4.5. RESUMEN DE DATOS GEOTÉCNICOS 
A continuación, se presenta el resumen por tramo de los datos geotécnicos consecuencia de la campaña geotécnica realizada 

TABLA 3 RESUMEN DE DATOS GEOTÉCNICOS DEL TRAMO [ADMINISTRADOR] 

Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 


Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
1  0.37  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
1  4119+000  5000+440  <2.0  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(ML) Limo de baja compresibilidad; mezcla de 
2  1.20  limo de baja plasticidad, arena y grava; polvo de  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
roca. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
2  5000+440  5000+960  física y química medianamente avanzadas,  <2.0  5  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
3  5000+960  5002+745  1  0.15  Tierra vegetal  Despalme              100  0  0  <2.0  2:1  4  3:2  A, B, C 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(MH) Limo de alta compresibilidad; mezcla de 
2  1.2  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
limo de alta plasticidad, arena y grava. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
4  5002+745  5003+490  física y química medianamente avanzadas,  ‐  3  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.48  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
5  5003+490  5004+310  ‐  3  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.43  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
6  5004+310  5004+490  (SM) Arena limosa muy compacta; mezcla de  <2.0  3  3:2 
2  0.80  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 

20 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 

1  0.20  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 


Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
7  5004+490  5004+800  <2.0  3  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.25  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(ML) Limo de baja compresibilidad; mezcla de 
2  1.0  limo de baja plasticidad, arena y grava; polvo de  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
roca. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
8  5004+800  5004+980  física y química medianamente avanzadas,  <2.0  3  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
9  5004+980  5005+680  1  0.3  Tierra vegetal  Despalme              100  0  0  <2.0  2:1  3  3:2  A, B, C 

21 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.1  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(CH) Arcilla de alta compresibilidad; mezcla de 
2  1.6  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
arcilla de alta plasticidad, arena y grava. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
10  5005+680  5005+890  física y química medianamente avanzadas,  ‐  3  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
11  5005+890  5007+180  ‐  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.23  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
12  5007+180  5007+360  (MH) Limo de alta compresibilidad; mezcla de  ‐  3  3:2 
2  0.80  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
limo de alta plasticidad, arena y grava. 

22 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.55  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
13  5007+360  5008+155  ‐  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.5  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
2  0.6  (GM) Grava limosa; mezcla de grava, arena y limo. Desperdicio  0.96 0.91 0.87     100  0  0  1:3  A, B, C 

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
14  5008+155  5008+380  medianamente cementadas, fracturadas. Al  ‐  3  3:2 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 

15  5008+380  5009+090  1  0.20  Tierra vegetal  Despalme              100  0  0  ‐  2:1  3  3:2  A, B, C 

23 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(CL) Arcilla de baja compresibilidad; mezcla de 
2  1.0  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
arcilla de baja plasticidad, arena y grava.  
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
16  5009+090  5009+200  física y química medianamente avanzadas,  ‐  4  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.53  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
17  5009+200  5009+850  <2.0  3  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.28  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
2  1.0  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
18  5009+850  5011+420  <2.0  2  3:2 
(CL) Arcilla de baja compresibilidad; mezcla de 
3  2.5  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
arcilla de baja plasticidad, arena y grava.  

24 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
19  5011+420  5011+940  <2.0  3  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  60  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC/SC) Grava y arena arcillosa; mezclas de grava,  2:1 
2  1.0  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
arena y arcilla. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
20  5011+940  5012+420  física y química medianamente avanzadas,  <2.0  1  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  1.0  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
21  5012+420  5012+600  arcilla.  <2.0  1  3:2 
(SM) Arena limosa muy compacta; mezcla de 
3  0.45  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 

25 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  A, B, C 
2:1 
2  1.3  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
22  5012+600  5013+235  medianamente cementadas, fracturadas. Al  <2.0  1  3:2 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.00  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 
2:1 
2  1.5  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
(CL) Arcilla de baja compresibilidad; mezcla de 
3  1.3  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
arcilla de baja plasticidad, arena y grava.  
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
23  5013+235  5013+390  física y química medianamente avanzadas,  <2.0  1  3:2 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Compactado          1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  A, B, C 
24  5013+390  5014+060  <2.0  2:1  1  3:2 
2  0.35  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 

26 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 

1  0.36  Tierra vegetal  Despalme              100  0  0  A, B, C 


2:1 
2  0.6  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
(GC) Grava arcillosa; mezclas de grava, arena y 
3  1.1  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arcilla. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
25  5014+060  5015+830  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.38  Tierra Vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  1.3  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
arcilla. 
(ML) Limo de baja compresibilidad; mezcla de 
3  0.5  limo de baja plasticidad, arena y grava; polvo de  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, D, J 
roca. 
Roca sedimentaria clástica (Rsc). Caliza 
26  5015+830  5016+520  mediantamente intemperizadas con alteración  <2.0  2  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 
27  5016+520  5016+600  <2.0  2:1  2  3:2 
2  2.1  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 

27 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
3  0.92  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 
2:1 
2  0.5  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
(ML) Limo de baja compresibilidad; mezcla de 
3  1.2  limo de baja plasticidad, arena y grava; polvo de  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, D, J 
roca. 
Roca sedimentaria clástica (Rsc). Caliza 
28  5016+600  5017+340  mediantamente intemperizadas con alteración  <2.0  2  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.   excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  0.7  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
arcilla. 
(SM) Arena limosa muy compacta; mezcla de 
3  0.95  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
29  5017+340  5017+680  mediantamente intemperizadas con alteración  <2.0  2  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
30  5017+680  5018+040  1  0.4  Tierra vegetal  Despalme              100  0  0  <2.0  2:1  2  3:2  A, B, C 

28 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
(GC) Grava arcillosa; mezclas de grava, arena y 
2  1.7  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
arcilla. 
(ML) Limo de baja compresibilidad; mezcla de 
3  0.5  limo de baja plasticidad, arena y grava; polvo de  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, C 
roca. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.32  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  0.52  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
arcilla. 
(GM/GP) Grava limosa mal graduada; mezcla de 
3  2  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
grava, arena y limo. 
Roca sedimentaria clástica (Rsc). Caliza 
31  5018+040  5019+700  mediantamente intemperizadas con alteración  <2.0  1  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.39  Tierra vegetal  Despalme              100  0  0  A, B, C 
32  5019+700  5021+560  (GM/GP) Grava limosa mal graduada; mezcla de  <2.0  2:1  3  3:2 
2  0.80  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 

29 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.45  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GM/GP) Grava limosa mal graduada; mezcla de  2:1 
2  1.6  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 
3  0.4  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87     100  0  0  1:1  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
33  5021+560  5021+920  física y química medianamente avanzadas,  9  3  3:2 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.1  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GM/GP) Grava limosa mal graduada; mezcla de  2:1 
2  2.0  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
34  5021+920  5022+280  física y química medianamente avanzadas,  ‐  2  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.23  Tierra vegetal  Despalme              100  0  0  A, B, C 
(SC) Arena arcillosa; mezclas de arena, grava y  2:1 
2  1.5  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
35  5022+280  5022+490  arcilla.  ‐  1  3:2 
(SM) Arena limosa muy compacta; mezcla de 
3  Indef.  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 

30 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 
(SC) Arena arcillosa; mezclas de arena, grava y  2:1 
2  1.2  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
arcilla. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
36  5022+490  5023+100  física y química medianamente avanzadas,  <2.0  1  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 

1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 


(GM/GP) Grava limosa bien graduada; mezcla de  2:1 
2  0.75  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 
(SM) Arena limosa muy compacta; mezcla de 
3  0.80  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
37  5023+100  5023+220  mediantamente intemperizadas con alteración  <2.0  1  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GM/GP) Grava limosa bien graduada; mezcla de  2:1 
2  0.5  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
38  5023+220  5023+770  física y química medianamente avanzadas,  <2.0  1  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 

31 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GM/GP) Grava limosa bien graduada; mezcla de  2:1 
2  0.6  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 
(SM) Arena limosa muy compacta; mezcla de 
3  0.4  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
39  5023+770  5023+900  mediantamente intemperizadas con alteración  <2.0  1  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
40  5023+900  5024+640  <2.0  3  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.25  Tierra vegetal  Despalme              100  0  0  A, B, C 
2:1 
2  0.7  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
(GC) Grava arcillosa; mezclas de grava, arena y 
3  0.3  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, C 
arcilla. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
41  5024+640  5025+000  física y química medianamente avanzadas,  <2.0  1  3:2 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  A, B, C 
42  5025+000  5026+100  <2.0  2:1  2  3:2 
2  0.9  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 

32 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.18  Tierra vegetal  Despalme              100  0  0  A, B, C 
2:1 
2  0.5  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
(SM) Arena limosa muy compacta; mezcla de 
3  0.4  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
43  5026+100  5027+020  física y química medianamente avanzadas,  <2.0  3  3:2 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.26  Tierra vegetal  Despalme              100  0  0  A, B, C 
2:1 
2  0.2  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
44  5027+020  5027+750  medianamente cementadas, fracturadas. Al  ‐  3  3:2 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.55  Tierra vegetal  Despalme              100  0  0  A, B, C 
2:1 
2  1.4  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
45  5027+750  5028+490  <2.0  2  3:2 
(CL) Arcilla de baja compresibilidad; mezcla de 
3  0.5  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, D, J 
arcilla de baja plasticidad, arena y grava.  

33 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  A, B, C 
2:1 
2  0.4  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
46  5028+490  5028+920  medianamente cementadas, fracturadas. Al  ‐  3  3:2 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.5  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GM/GP) Grava limosa bien graduada; mezcla de  2:1 
2  1.25  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 
(SM) Arena limosa muy compacta; mezcla de 
3  0.45  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
47  5028+920  5029+440  mediantamente intemperizadas con alteración  ‐  2  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.   excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.6  Tierra vegetal  Despalme              100  0  0  A, B, C 
48  5029+440  5029+740  (GM/GP) Grava limosa bien graduada; mezcla de  <2.0  2:1  3  3:2 
2  1  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 

34 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.6  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GM/GP) Grava limosa bien graduada; mezcla de  2:1 
2  0.50  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
grava, arena y limo. 
3  0.20  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
49  5029+740  5030+065  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.25  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  0.8  Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 
arcilla. 
3  0.5  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
50  5030+065  5030+940  física y química medianamente avanzadas,  ‐  3  3:2 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.29  Tierra vegetal  Despalme              100  0  0  A, B, C 
51  5030+940  5034+200  (GC) Grava arcillosa; mezclas de grava, arena y  <2.0  2:1  3  3:2 
2  0.5  Desperdicio  0.93 0.88 0.83     100  0  0  A, B, C 
arcilla. 

35 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 

1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 


(GM/GP) Grava limosa bien graduada; mezcla de  2:1 
2  1.3  Desperdicio  0.93 0.88 0.83     100  0  0  A, B, C 
grava, arena y limo. 
(SM) Arena limosa muy compacta; mezcla de 
3  0.3  Compactado 0.96 0.91 0.87     100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
52  5034+200  5034+290  mediantamente intemperizadas con alteración  <2.0  2  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.45  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  1.4  Desperdicio  0.93 0.88 0.83     100  0  0  A, B, C 
arcilla. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
53  5034+290  5035+100  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  A, B, C 
54  5035+100  5036+000  (GC) Grava arcillosa; mezclas de grava, arena y  <2.0  2:1  2  3:2 
2  0.9  Desperdicio  0.93 0.88 0.83     100  0  0  A, B, C 
arcilla. 

36 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
(SM) Arena limosa muy compacta; mezcla de 
3  0.3  Compactado             100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  1.3  Desperdicio  0.93 0.88 0.83     100  0  0  A, B, C 
arcilla. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
55  5036+000  5036+360  física y química medianamente avanzadas,  <2.0  3  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  1.3  Desperdicio  0.93 0.88 0.83     100  0  0  A, B, C 
arcilla. 
(ML) Limo de baja compresibilidad; mezcla de 
3  0.3  limo de baja plasticidad, arena y grava; polvo de  Desperdicio  0.92 0.87 0.83     100  0  0  1:3  A, B, D, J 
roca. 
Roca sedimentaria clástica (Rsc). Caliza 
56  5036+360  5036+500  mediantamente intemperizadas con alteración  ‐  3  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
57  5036+500  5041+200  1  0.25  Tierra vegetal  Despalme              100  0  0  ‐  2:1  3  3:2  A, B, C 

37 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
(GC) Grava arcillosa; mezclas de grava, arena y 
2  1.2  Desperdicio  0.93 0.88 0.83     100  0  0  A, B, C 
arcilla. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  1.2  Compactado 0.93 0.88 0.83  100  0  0  A, B, D, J 
arcilla.    
(CH) Arcilla de alta compresibilidad; mezcla de 
3  0.6  Desperdicio           100  0  0  1:3  A, B, C 
arcilla de alta plasticidad, arena y grava.    
Roca sedimentaria clástica (Rsc). Caliza 
58  5041+200  5041+250  mediantamente intemperizadas con alteración  <2.0  2  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo  1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración.          
1  0.18  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  2.1  Compactado 0.93 0.88 0.83  100  0  0  A, B, D, J 
arcilla.    
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
59  5041+250  5042+600  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo  1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración.          
1  0.35  Tierra vegetal  Despalme              100  0  0  A, B, C 
60  5042+600  5042+800  ‐  2:1  2  3:2 
2  0.6  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.93 0.88 0.83     100  0  0  A, B, D, J 

38 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
(SM) Arena limosa muy compacta; mezcla de 
3  1.2  Compactado 0.96 0.91 0.87  100  0  0  1:3  A, B, D, J 
arena, grava y limo. Deseable    
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo  1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración.          
1  0.35  Tierra vegetal  Despalme              100  0  0  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y  2:1 
2  0.7  Compactado 0.93 0.88 0.83  100  0  0  A, B, D, J 
arcilla.    
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
61  5042+800  5043+000  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo  1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración.          
 

TABLA 4 RESUMEN DE DATOS GEOTÉCNICOS DEL TRAMO 5071+500 – 6006+000 

Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 


Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
1  0.14  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
1  5070+000  5071+440  <2.0  3  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
2  5071+440  5071+580  1  0.15  Tierra vegetal  Despalme              100  0  0  ‐  2:1  3  3:2  A, B, C 

39 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
(ML) Limo de baja compresibilidad; mezcla de 
2  1.2  limo de baja plasticidad, arena y grava; polvo de  Desperdicio  0.93 0.88 0.83     100  0  0  1:3  A, B, C 
roca. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  5071+580  5072+660  <2.0  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.25  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(MH) Limo de alta compresibilidad; mezcla de 
2  0.79                             A, B, C 
limo de alta plasticidad, arena y grava. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
4  5072+660  5072+760  física y química medianamente avanzadas,  <2.0  3  3:2 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
5  5072+760  6000+600  <2.0  2  3:2 
2  Indef.  física y química medianamente avanzadas,  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianamente cementadas, fracturadas. Al 
excavarse se obtendrán fragmentos chicos y 

40 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y 
2  0.55  Compactado 1.02 0.96 0.91     100  0  0  1:3  A, B, D, J 
arcilla. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
6  6000+600  6000+660  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
7  6000+660  6000+800  <2.0  2  03:02 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
2  0.45  (GM) Grava limosa; mezcla de grava, arena y limo.  Compactado 1.02 0.96 0.91     100  0  0  1:3  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
8  6000+800  6000+880  medianamente cementadas, fracturadas. Al  <2.0  2  3:2 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
9  6000+880  6001+180  1  0.24  Tierra vegetal  Despalme              100  0  0  <2.0  2:1  3  3:2  A, B, C 

41 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.12  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(ML) Limo de baja compresibilidad; mezcla de 
2  0.42  limo de baja plasticidad, arena y grava; polvo de  Desperdicio  0.93 0.88 0.83     100  0  0  1:3  A, B, C 
roca. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
10  6001+180  6001+220  física y química medianamente avanzadas,  <2.0  3  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.27  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
11  6001+220  6002+830  <2.0  10  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
12  6002+830  6002+980  (SM) Arena limosa muy compacta; mezcla de  ‐  10  3:2 
2  0.6  Compactado 1.02 0.96 0.91     100  0  0  1:3  A, B, D, H 
arena, grava y limo. Deseable 

42 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.16  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
13  6002+980  6003+560  ‐  10  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y 
2  0.95  Compactado 1.02 0.96 0.91     100  0  0  1:3  A, B, D, J 
arcilla. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
14  6003+560  6003+620  física y química medianamente avanzadas,     5  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
15  6003+620  6003+900     2  3:2 
2  Indef.  medianamente cementadas, fracturadas. Al  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
excavarse se obtendrán fragmentos chicos y 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 

43 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.18  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y 
2  0.70  Compactado 1.02 0.96 0.91     100  0  0  1:3  A, B, D, J 
arcilla. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
16  6003+900  6004+615  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
17  6004+615  6005+000  medianamente cementadas, fracturadas. Al  <2.0  3  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  5  80  15  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
 

TABLA 5 RESUMEN DE DATOS GEOTÉCNICOS DEL TRAMO 6017+000 AL 6030+000  

Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 


Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
1  6018+000  6019+070  1  0.33  Tierra vegetal  Despalme              100  0  0  <2.0  2:1  9  3:2  A, B, C 

44 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.25  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(CL) Arcilla muy firme de baja compresibilidad; 
2  0.45  mezcla de arcilla de baja plasticidad, arena y  Desperdicio  0.92 0.87 0.83     100  0  0  A, B, C 
grava; polvo de roca. 

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
2  6019+070  6019+160  física y química medianamente avanzadas,  ‐  3  3:2 
1:3 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.35  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  6019+160  6020+890  ‐  3  3:2 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40     A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.35  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(CL) Arcilla muy firme de baja compresibilidad; 
4  6020+890  6020+920  ‐  3  3:2 
2  0.35  mezcla de arcilla de baja plasticidad, arena y  Desperdicio  0.95 0.90 0.85     100  0  0  1:3  A, B, C 
grava; polvo de roca. 

45 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.18  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
5  6020+920  6021+455  <2.0  3  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(SM) Arena limosa muy compacta; mezcla de 
2  2.7  Compactado 0.97 0.92 0.87     100  0  0  A, B, D,  J 
arena, grava y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
6  6021+455  6021+775  física y química medianamente avanzadas,  <2.0  3  3:2 
medianamente cementadas, fracturadas. Al  1:3 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
7  6021+775  6022+095  1  0.3  Tierra vegetal  Despalme              100  0  0  ‐  2:1  3  3:2  A, B, C 

46 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(SM) Arena limosa muy compacta; mezcla de 
2  0.6  Compactado 0.97 0.92 0.87     100  0  0  A, B, D,  J 
arena, grava y limo. Deseable 

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
8  6022+095  6022+170  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al  1:3 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.35  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
9  6022+170  6024+270  <2.0  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
10  6024+270  6025+580  ‐  3  3:2 
2  1.03  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.92 0.87 0.83     100  0  0  2:1  A, B, D,  J 

47 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(CL) Arcilla de baja compresibilidad; mezcla de 
2  0.4  Compactado 0.92 0.87 0.83     100  0  0  2:1  A, B, D,  J 
arcilla de baja plasticidad, arena y grava. 
(SP‐SM) Arena mal graduada muy compactada; 
3  0.25  mezcla de arena y grava con poco o nada de finos.  Compactado 0.97 0.92 0.87     100  0  0  A, B, D,  J 
Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
11  6025+580  6025+660  mediantamente intemperizadas con alteración  ‐  2  3:2 
física y química medianamente avanzadas,  1:3 
medianamente cementadas, fracturadas. Al 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.33  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 

2  0.70  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.92 0.87 0.83     100  0  0  2:1  A, B, D,  J 

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
12  6025+660  6027+565  física y química medianamente avanzadas,  <2.0  3  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
13  6027+565  6027+990  1  0.27  Tierra vegetal  Despalme              100  0  0  ‐  2:1  3  3:2  A, B, C 

48 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

2  0.70  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.92 0.87 0.83     100  0  0  2:1  A, B, D,  J 

(GM) Grava limosa muy compactada; mezcla de 
3  4.4  Compactado 0.97 0.92 0.87     100  0  0  A, B, D,  J 
grava, arena y limo. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al  1:3 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.35  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 

2  0.45  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.92 0.87 0.83     100  0  0  2:1  A, B, D,  J 

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
14  6027+990  6028+000  física y química medianamente avanzadas,  ‐  2  3:2 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.35  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 

2  0.3  (GM) Grava limosa; mezcla de grava, arena y limo. Compactado 0.92 0.87 0.83     100  0  0  2:1  A, B, D,  J 


15  6028+000  6028+140  <2.0  2  3:2 
(SM) Arena limosa muy compactada; mezcla de 
3  Indef.  Compactado 0.97 0.92 0.87     100  0  0  1:3  A, B, D,  J 
arena, grava y limo. Deseable 
1  0.3  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
16  6028+140  6029+255  (GP) Grava mal graduada; mezcla de grava y arena  <2.0  3  3:2 
2  1.16  Compactado 0.92 0.87 0.83     100  0  0  2:1  A, B, D,  J 
con poco o nada de finos. 

49 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(GC) Grava arcillosa; mezclas de grava, arena y 
2  0.35  Compactado 0.92 0.87 0.83     100  0  0  2:1  A, B, D,  J 
arcilla. 
(GC) Grava arcillosa muy compactada; mezclas de 
3  0.45  Compactado 0.97 0.92 0.87     100  0  0  A, B, D,  J 
grava, arena y arcilla. Deseable 
Roca sedimentaria clástica (Rsc). Caliza 
17  6029+255  6029+340  mediantamente intemperizadas con alteración  <2.0  2  3:2 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al  1:3 
4  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  60  40  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 

1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 


(GP) Grava mal graduada; mezcla de grava y arena 
1  0.98  Compactado 0.92 0.87 0.83  100  0  0  2:1  A, B, D,  J 
con poco o nada de finos.    
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
18  6029+340  6029+620  física y química medianamente avanzadas,  <2.0  2  3:2 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo  1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
        
19  6029+620  6030+000  1  0.80  Tierra vegetal  Despalme              100  0  0  <2.0  2:1  3  3:2  A, B, C 

50 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  90% 95% 100% Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
medianamente cementadas, fracturadas. Al 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo  1.07  0  60  40  1:3  A, B, D, N 
medianos, con menos del 10% de otros 
fragmentos o de suelo (Fcm‐G/S). Forma 
angulosa, textura rugosa y alterados como grado 
de alteración. 
        
 
TABLA 6 RESUMEN DE DATOS GEOTÉCNICOS DEL TRAMO 6036+800– 6067+000 

Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 


Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
1  0.41  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
1  6037+000  6040+630  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.15  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(GP‐GM) Grava mal graduada; mezcla de grava 
2  0.3  Compactado 0.97 0.92 0.88    100  0  0  1:3  A, B, D, J 
arena con poco o nada de finos. Deseable. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
2  6040+630  6040+700  física y química medianamente avanzadas,  <2  4  3:2 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
3  6040+700  6041+510  1  0.3  Tierra vegetal  Despalme              100  0  0  <2  2:1  4  3:2  A, B, C 

51 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
2  0.3  (GM) Grava limosa; mezcla de grava, arena y limos Compactado 0.97 0.92 0.88    100  0  0  1:3  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
4  6041+510  6041+550  <2  1:3 Talud  4  3:2 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.25  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
5  6041+550  6044+185  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 

1  0.4  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 


6  6044+185  6044+320  (MH) Limo de alta compresibilidad; mezcla de limo  <2  4  3:2 
2  0.80  Desperdicio  0.96 0.91 0.87    100  0  0  1:3  A, B, C 
de alta plasticidad, arena y grava. 

52 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.34  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
7  6044+320  6047+000  <2  izquierdo  5  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
(SW/SM) Arena bien graduada; mezcla de arena, 
1  0.4  Compactado 0.97 0.92 0.88    10  0  0  2:1  A, B, C, J 
gravas y limo. Deseable. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
8  6047+000  6047+060  <2  1:3 Talud  4  3:2 
medianamente cementadas, fracturadas. Al 
izquierdo 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
9  6047+060  6047+510  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 

53 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
1  0.30  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(MH) Limo de alta compresibilidad; mezcla de limo 
2  0.60  Desperdicio  0.96 0.91 0.87    100  0  0  1:3  A, B, C 
de alta plasticidad, arena y grava. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
10  6047+510  6047+580  física y química medianamente avanzadas,  <2  3  3:2 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.32  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
11  6047+580  6052+420  <2  izquierdo  5  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.70  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(GP‐GM) Grava mal graduada; mezcla de grava 
2  0.60  Compactado 0.97 0.92 0.88    100  0  0  1:3  A, B, D, J 
arena con poco o nada de finos. Deseable. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
12  6052+420  6052+490  física y química medianamente avanzadas,  <2  3  3:2 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
13  6052+490  6055+100  1  0.14  Tierra vegetal  Despalme              100  0  0  <2  2:1  4  3:2  A, B, C 

54 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(CH) Arcilla de alta compresibilidad ; mezcla de 
2  0.4  Desperdicio  0.96 0.91 0.87    100  0  0  1:3  A, B, C 
arcilla de alta plasticidad, arena y grava 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
14  6055+100  6055+150  física y química medianamente avanzadas,  <2  4  3:2 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.25  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
15  6055+150  6056+170  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.20  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
16  6056+170  6056+220  (MH) Limo de alta compresibilidad; mezcla de limo  ‐  4  3:2 
2  1.2  Desperdicio  0.96 0.91 0.87    100  0  0  1:3  A, B, C 
de alta plasticidad, arena y grava. 

55 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.4  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
17  6056+220  6056+770  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
(MH) Limo de alta compresibilidad; mezcla de limo 
1  1.00  Desperdicio  0.96 0.91 0.87    100  0  0  1:3  A, B, C 
de alta plasticidad, arena y grava. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
18  6056+770  6056+860  <2  1:3 Talud  3  3:2 
medianamente cementadas, fracturadas. Al 
izquierdo 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.1  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
19  6056+860  6057+270  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 

56 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(MH) Limo de alta compresibilidad; mezcla de limo 
2  1.0  Desperdicio  0.96 0.91 0.87    100  0  0  1:3  A, B, C 
de alta plasticidad, arena y grava. 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
20  6057+270  6057+340  física y química medianamente avanzadas,  ‐  3  3:2 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.31  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
21  6057+340  6061+940  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.3  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(CH) Arcilla de alta compresibilidad ; mezcla de 
2  0.9  Desperdicio  0.96 0.91 0.87    100  0  0  1:3  A, B, C 
arcilla de alta plasticidad, arena y grava 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
22  6061+940  6061+980  física y química medianamente avanzadas,  <2  3  3:2 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
23  6061+980  6063+170  1  0.1  Tierra vegetal  Despalme              100  0  0  <2  2:1  4  3:2  A, B, C 

57 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
2  0.3  (GM) Grava limosa; mezcla de grava, arena y limos Compactado 0.97 0.92 0.88    100  0  0  1:3  A, B, D, J 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
24  6063+170  6063+210  <2  1:3 Talud  3  3:2 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.33  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 

Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
25  6063+210  6065+560  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 

1  0.3  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 


26  6065+560  6065+710  (SW/SM) Arena bien graduada; mezcla de arena,  <2  3  3:2 
2  0.60  Compactado 0.97 0.92 0.88    100  0  0  1:3  A, B, D, J 
gravas y limo. Deseable. 

58 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.27  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
27  6065+710  6066+080  <2  izquierdo  4  3:2 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
1  0.2  Tierra vegetal  Despalme              100  0  0  2:1  A, B, C 
(CL) Arcillas de alta compresibilidad; mezcla de 
2  0.3  Desperdicio  0.96 0.91 0.87    100  0  0  1:3  A, B, C 
arcilla de alta plasticidad, arena y grava  
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
28  6066+080  6066+120  física y química medianamente avanzadas,  <2  2  3:2 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
3  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
29  6066+120  6068+000  1  0.3  Tierra vegetal  Despalme              100  0  0  <2  2:1  4  3:2  A, B, C 

59 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
Cadenamiento  Estrato  Tratamiento  CVV  Clasif. Presupuestal Corte  Terraplén 
Nº  Clasificación del suelo SCT  Observaciones
De   Hasta  Número  Espesor (m)  probable  0.90 0.95 1.00 Bandeo A  B  C  Hmax (m)  Talud (H:V)  Hmax (m)  Talud (H:V)
Roca sedimentaria clástica (Rsc). Caliza 
mediantamente intemperizadas con alteración 
física y química medianamente avanzadas, 
1:3 Talud 
medianamente cementadas, fracturadas. Al 
izquierdo 
2  Indef.  excavarse se obtendrán fragmentos chicos y  Bandeo           1.07  0  50  50  A, B, D, N 
1:2 Talud 
medianos, con menos del 10% de otros 
derecho 
fragmentos o de suelo (Fcm‐G/S). Forma angulosa, 
textura rugosa y alterados como grado de 
alteración. 
 

60 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

4.5.1. Observaciones particulares a las tablas de datos geotécnicos 
A. En todos los casos el cuerpo de terraplén, se compactará al 90% o se bandeará según sea el caso; 
las capas de transición y subrasante se compactarán al 95% y 100% respectivamente; los grados de 
compactación  son  con  respecto  a  la  prueba  AASHTO  Stándar  ó  Modificada  dependiendo  de  la 
granulometría del material, por lo que quedará a juicio del Laboratorio de Control, aplicar la prueba 
que corresponda. 

B.  En  todos  los  casos,  cuando  no  se  indique  otra  cosa,  el  terreno  natural,  después  de  haberse 
efectuado el despalme correspondiente, el piso descubierto deberá compactarse al 90% de su Peso 
Volumétrico Seco Máximo (P.V.S.M.) en una profundidad mínima de 0.20 m ó bandearse según sea 
el caso. 

C.  Material  que,  por  sus  características,  NO  debe  utilizarse  ni  en  la  construcción  del  cuerpo  de 
terraplén. 

D.  Material  que,  por  sus  características,  solo  puede  utilizarse  en  la  formación  del  cuerpo  del 
terraplén, mismo que deberá compactarse al 90% de su Peso Volumétrico Seco Máximo (P.V.S.M.) 
ó bandearse según sea el caso. 

E. Material que, por sus características, puede utilizarse en la formación del cuerpo de terraplén y 
la capa de transición (subyacente). 

F. Material que, por sus características, puede utilizarse en la formación del cuerpo del terraplén, la 
capa de transición y la capa subrasante. 

G. En terraplenes formados con este material, se deberá proyectar una capa de transición de 0.20 
m. de espesor, cuando la altura de estos sea menor de 0.80 m. y cuando sea mayor, la transición 
será de 0.70 m.; y en ambos casos se proyectará la capa subrasante de 0.30 m. de espesor. 

H. En terraplenes formados en este material, se deberá proyectar una capa de transición de 0.70 m. 
de espesor como mínimo y la capa subrasante de 0.30 

m. de espesor, compactadas al 95 y 100% respectivamente, las cuales se construirán con material 
precedente del banco de préstamo más cercano. 

I. En cortes formados en este material, la cama de corte, se deberá compactar al 95% de su Peso 
Volumétrico Seco Máximo (P.V.S.M.), en una profundidad mínima de 0.20 m. y se deberá proyectar 
una capa subrasante de 0.30 m. de espesor, compactándola al 100%, con material procedente del 
banco de préstamo más cercano 

J. En este tramo se deberá proyectar en cortes y terraplenes bajos, una capa 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

de transición de 0.70 m. de espesor como mínimo y una capa subrasante de 0.30 m. de espesor; en 
caso de ser necesario se deberán abrir cajas con profundidad suficiente para alojar las capas citadas; 
ambas capas se construirán con material procedente del banco de préstamo más cercano. 

K. En cortes, se deberá escarificar los 0.15 m. superiores y acamellonar; la superficie descubierta, se 
deberá compactar al 100% de su Peso Volumétrico Seco Máximo (P.V.S.M.), en un espesor mínimo 
de 0.15 m. con lo que quedará formada la primera capa subrasante, con el material acamellonado 
se construirá la segunda capa subrasante, misma que deberá compactarse también al 100% de su 
P.V.S.M. 

L. En cortes formados en este material, se proyectará únicamente una capa subrasante de 0.30 m. 
de espesor mínimo, compactándola al 100% y se construirá con material procedente del banco de 
préstamo más cercano. 

M.  En  cortes  formados  en  este  material,  se  escarificarán  los  primeros  0.30  m.  a  partir  del  nivel 
superior de subrasante, se acamellonará el material producto del escarificado y se compactará la 
superficie descubierta al 95%, hasta una profundidad de 0.20 m.; Posteriormente, con el material 
acamellonado se construirá la capa subrasante de 0.30 m. de espesor. 

N. En el caso de cortes construidos en este material, se deberá proyectar una capa de transición y 
una capa subrasante de 0.20 m. y 0.30 m. de espesor respectivamente, compactándolas al 95% y 
100%; ambas capas se construirán con material procedente del banco de préstamo más cercano. 

4.6. BANCOS DE MATERIALES 
Conforme  a  los  requerimientos  del  proyecto  geométrico  y  de  terracerías  del  todo  el  tramo  en 
estudio es indispensable  emplear  material producto de banco para la formación de las  capas de 
Terraplén, subbalasto, balasto así como el pedraplén y la capa de transición para zonas inundables, 
por lo cual se realizó el análisis geológico de la zona, la búsqueda de bancos de materiales activos 
además  de  contar  con  la  relación  que  el  catastro  de  bancos  reporta  en  la  región  editada  por  la 
Dirección General de Servicios Técnicos (DGST) de la SCT, con estos datos se procedió a ubicar los 
sitios  preestablecidos  y/o  propuestos  según  sea  el  caso,  zonificando  los  lugares  potencialmente 
adecuados en cuanto a tipo de material y cercanía se refiere para su utilización como banco, en 
todos los casos se procedió a realizar su exploración y muestreo respectivo con el objeto de analizar 
sus propiedades mecánicas y delimitar la zona de explotación, determinando con esto su capacidad 
o volumen de explotación. 

Se han estudiado los bancos que se muestran en la Tabla 7.

62 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
 
TABLA 7 BANCOS DE PRÉSTAMO PARA EL TRAMO 3 

CLASIFICACIÓN
COEF. DE VARIACIÓN VOLUMEN
PARA DESPALME TRATAMIENTO
No. DENOMINACIÓN LOCALIZACIÓN ESTRATO PRESUPUESTO VOLUMÉTRICA UTILIZACIÓN APROVECHABLE
(cm) PROBABLE

A B C 90% 95% 100% BANDEADO
Carretera
Campeche – Mérida
TERRAPLÉN
Km 142+750 Lado
SUBRASANTE
Izquierdo. A 750 m TRITURADO Y
001 PROSER N.A. 05 80 15 N.A. 0.68 0.71 0.75 SUB 103,722
delante del Km COMPACTADO
BALASTO
142+000 de la
carretera Campeche
– Mérida
Carretera
Campeche – Mérida
Km. 128+630 lado TERRAPLÉN
Izquierdo a 600 m. SUBRASANTE TRITURADO Y
002 PROSER EJIDAL N.A. 00 60 40 N.A. 0.71 0.75 0.79 286,110
A 630 m delante del SUB COMPACTADO
Km 128+000 de la BALASTO
carretera Campeche
– Mérida
Carretera Izamal –
Valladolid a 10,330
BANCO m del entronque con TERRAPLÉN
TRITURADO Y
003 RANCHO SAN carretera Izamal – N.A. 00 50 50 N.A. 0.70 0.74 0.77 SUBRASANTE 202,764
COMPACTADO
LORENZO Dzilam González
lado derecho a
140m
Carretera Valladolid
– Mérida Km 21+620
Lado derecho a
TERRAPLÉN
3,394 m. A 620 m TRITURADO Y
004 BANCO TICOPÓ N.A. 00 60 40 N.A. 0.69 0.73 0.76 SUBRASANTE 137,141
delante del Km COMPACTADO
21+000 de la
carretera Valladolid
– Mérida.
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
CLASIFICACIÓN
COEF. DE VARIACIÓN VOLUMEN
PARA DESPALME TRATAMIENTO
No. DENOMINACIÓN LOCALIZACIÓN ESTRATO PRESUPUESTO VOLUMÉTRICA UTILIZACIÓN APROVECHABLE
(cm) PROBABLE

A B C 90% 95% 100% BANDEADO
Sobre Calle 5 a 11,
218 metros hacia el TERRAPLÉN
BANCO
Este del entronque SUBRASANTE TRITURADO Y
005 SORIANO DE N.A. 00 60 40 N.A. 0.67 0.71 0.74 190,080
del libramiento SUB COMPACTADO
BECAL 2
Mérida Campeche y BALASTO
Calle 5.
 

Las ubicaciones de cada uno de estos bancos se muestran en las fichas incluidas en el ANEXO 1: FICHAS DE BANCOS DE MATERIALES. 

64 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5. DISEÑO 

Para el diseño de los espesores de capas de terracerías y de la estructura ferroviaria se han obtenido 
los criterios de diseño que se muestran en la Tabla 8 

TABLA 8 CRITERIOS DE DISEÑO 

CRITERIO CANTIDAD 
Carga máxima por eje del tren de mercancías 32.5 Ton
Carga máxima por eje del tren de pasajeros 19 Ton
Ancho de vía (Escantillón) 1435 mm
Velocidad máxima del tren de mercancías 100 km/h
Velocidad máxima del tren de pasajeros 160 km/h
Longitud de tren de mercancías 500 m
Longitud de tren de pasajeros 200 m
 

5.1. CLASIFICACIÓN DE LA VÍA A DISEÑAR 
Como conclusión de los criterios de diseño y con base en el MANUAL DE CALIDAD PARA MATERIALES 
EN LA SECCIÓN ESTRUCTURAL DE VÍAS FERRAS, de la SCT y el IMT, se ha establecido al tramo 3 como 
una Vía Férrea Tipo I la cual tiene como característica lo siguiente: 

Vías Férreas Tipo I: Son las vías férreas que soportarán el paso de cargas superiores a los 30 millones 
de toneladas netas/año. Serán incluidas aquí las vías electrificadas. 

Las capas que conformarán la vía y terracerías, son las siguientes: 

 Balasto, 

 Sub‐balasto, 

 Subrasante o capa de forma, 

 Terraplén, 

En caso de zonas inundables se deberá considerar en lugar de Terraplén: 

 Capa de Transición 

 Pedraplén 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5.2. ESPESOR DE TERRAPLÉN 
El espesor de la capa de terraplén, así como la capa de subrasante estarán condicionados por la 
rasante  definitiva  del  Proyecto  Ejecutivo.  Cabe  mencionar  que  esta  rasante  estará,  a  su  vez, 
condicionada por dos factores principales: 

1. Cota de Inundabilidad 

2. Obras de drenaje transversal 

Para mayor información del proyecto de rasante se podrá consultar el documento TMPE‐3‐VA‐TRA‐
INF‐0016 

5.3. ESPESOR DE BALASTO Y SUB‐BALASTO 
5.3.1. Método de cálculo 
Para dicha justificación se han seguido las indicaciones del “Manual de calidad para materiales en la 
sección  estructural  de  vías  férreas”  del  SCT  Mexicano,  la  normativa  AREMA  Manual  for  Railway 
Engineering. Ed 2019 y las recomendaciones del de la ficha UIC 719 R – “Obras de tierra y capas de 
asiento ferroviarias”. Los cálculos se han completado con la aplicación de un modelo avanzado de 
elementos finitos (MEF), tridimensional no lineal, utilizado tanto para el cálculo de esfuerzos en las 
distintas capas de la plataforma como para el de la rigidez global de vía. 

Estos cálculos se encuentran definidos en el Anexo 1, 2 y 3 del informe TMPE‐3‐VA‐VIA‐INF‐0001 
referente a la Plataforma y superestructura. 

5.3.2. Conclusiones 
Derivado del análisis realizado se ha encontrado que es posible optimizar la capa de balasto a 27 cm 
teniendo en consecuencia 33 cm de sub balasto, sin embargo, este análisis aún no ha sido aprobado 
por lo que se concluye que un espesor de balasto y sub‐balasto de 30cm y 30cm respectivamente 
es más que suficiente para cumplir con las cargas y condiciones estipuladas. 

5.4. CARACTERÍSTICAS DE MATERIALES 

5.4.1. Balasto 
El balasto puede definirse, según la norma mexicana PROY‐NOM‐003‐ARTF‐2018 como el material 
pétreo seleccionado, producto de la trituración de piedra, que se coloca sobre el sub‐balasto, debajo 
de  los  durmientes  y  entre  ellos,  cuya  función  es  soportar  las  cargas  rodantes  y  transmitirlas  a 
la terracería, distribuyéndolas en las formas que no se produzcan deformaciones perjudiciales en 
éstas. 

Tomando como referencia la norma mexicana PROY‐NOM‐003‐ARTF‐2018 en la que se menciona


que la vía deberá estar soportada por balasto que: 

66 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 Trasmita y distribuya la carga de la vía y el equipo rodante ferroviario al sub‐balasto; 

 Restrinja la vía lateral, longitudinal y verticalmente bajo las cargas dinámicas impuestas por 
el equipo rodante ferroviario y los esfuerzos térmicos ejercidos por los rieles; 

 Proporcione un drenaje adecuado para la vía, y 

 Mantenga en forma apropiada el nivel normal de la vía, el alineamiento y la nivelación. 

 Reparta la presión bajo el durmiente para impedir que el subsuelo blando se dañe con el 
peso de los trenes (deformando con ello el trazado de la vía). 

 Ofrezca  una  superficie  sólida,  pero  con  una  cierta  elasticidad  que  permite  absorber  las 
vibraciones. 

Cabe  mencionar  que  queda  excluida  de  estas  especificaciones  las  vías  que  estén  soportadas 
estructuralmente de otra forma (Losas de concreto, bloques plinto, etc.). 

La norma mexicana PROY‐NOM‐003‐ARTF‐2018 establece los siguientes valores recomendados para 
las pruebas del balasto mismo que aparecen en la Tabla 9. 

TABLA 9 VALORES RECOMENDADOS PARA PRUEBAS DE BALASTO. PROY‐NOM‐003‐ARTF‐2018 Y AREMA 2020 

MATERIALES QUE PUEDEN UTILIZARSE COMO BALASTO 

ESCORIA 
ROPIEDADES  ESCORIA DE 
DE  PRUEBA
GRANITO  BASALTO CUARCITA CALIZA DOLOMITA HORNOS DE 
ALTO  A.S.T.M.
ACERACIÓN 
HORNO 

Porcentaje  de 
material que  pasa  por  1.0%  1.0%  1.0%  1.0%  1.0%  1.0%  1.0%  C‐117 
la malla No. 200 

Volumen 
específico gravitacional  2.6  2.6  2.6  2.6  2.65  2.3  2.9  C‐127 
(ver nota 2) 

Porcentaje  de 
1  1  1  2  2  5  2  C‐127 
absorción 

Trozos  de  Arcilla 


y partículas  0.5%  0.5%  0.5%  0.5%  0.5%  0.5%  0.5%  C‐142 
desprendibles 

Degradación (LAA)  VER 
35%  25%  30%  30%  30%  40%  30% 
NOTA 1 

67 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

MATERIALES QUE PUEDEN UTILIZARSE COMO BALASTO 

ESCORIA 
ROPIEDADES  ESCORIA DE 
DE  PRUEBA
GRANITO  BASALTO CUARCITA CALIZA DOLOMITA HORNOS DE 
ALTO  A.S.T.M.
ACERACIÓN 
HORNO 

Intemperismo 
acelerado (Sulfato  de  5.0%  5.0%  5.0%  5.0%  5.0%  5.0%  5.0%  C‐88 
Sodio en 5 ciclos ) 

Partículas  alargadas  D‐4791


y/o planas  5.0%  5.0%  5.0%  5.0%  5.0%  5.0%  5.0%  Método 

Nota 1: Los materiales que al cribarse contienen partículas retenidas en la malla de 1" serán analizados con el método 
de prueba A.S.T.M. C‐535. Los materiales que al cribarse pase el 100% a través de la malla de 1" serán analizados con el 
método de prueba A.S.T.M. C‐131 

Nota 2: Solamente el volumen específico gravitacional el valor límite se tomará el mínimo y los límites para las demás 
pruebas se tomarán los valores máximos. 

Además, el MANUAL DE CALIDAD PARA MATERIALES EN LA SECCIÓN ESTRUCTURAL DE VÍAS FERRAS, 
de la SCT y el IMT, recomienda los valores que aparecen en la Tabla 10 para materiales de balasto. 

TABLA 10 VALORES PROPUESTOS PARA MATERIAL DEL BALASTO. MANUAL DE CALIDAD PARA MATERIALES 

CALIDAD
CARACTERÍSTICAS 
DESEABLE ADECUADA 
Granulometría: Zona  Granulometría Zonas 1 y 2 (ver  Granulometría Zonas 1 y 2 (ver 
Granulométrica  Figura 3)  Figura 3) 

Tamaño máximo (mm)  38  51 

Finos (%) (Mat. < 0.074 mm)  0  5 max (2) 

Equivalente Arena ( % )  50 min  40 min 

Desgaste Los Ángeles (%)  30 max  40 max 

Índice Durabilidad ( % )  50 min  40 min 

Peso Volumétrico seco máximo 
1800 min  1800 min 
(kg/m3) 

Partículas Angulosas (%)  90 min  60 min 

68 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

CALIDAD
CARACTERÍSTICAS 
DESEABLE ADECUADA 
(2) Con Límite Líquido de 25% máximo 

   
Figura 3 Granulometría balasto. Manual de calidad para materiales 

5.4.1.1. Granulometría 
La granulometría recomendada por la AREMA 2020 se presenta en la Tabla 11. 

TABLA 11 GRADUACIÓN DE BALASTO RECOMENDADA. AREMA 2020 

No, DEL  TAMAÑO 
PORCENTAJE QUE PASA 
TAMAÑO  NOMINAL DE 
(NOTA1)  ABERTURA  3”  2½”  2”  1½”  1”  ¾”  ½”  3/8”  No. 4  No. 8 
24  2½”‐3/4”  100  90‐100  ‐ 25‐60 ‐ 0‐10 0‐5 ‐  ‐ ‐
25  2½”‐3/8”  100  80‐100  60‐85 50‐70 25‐50 ‐ 5‐20 0‐10  0‐3 ‐
3  2”‐1”  ‐  100  95‐100 35‐70 0‐15 ‐ 0‐5 ‐  ‐ ‐
4A  2”‐ ¾”  ‐  100  90‐100 60‐90 10‐35 0‐10 ‐ 0‐3  ‐ ‐
4  1½”‐¾”  ‐  ‐  100 90‐100 20‐55 0‐15 ‐ 0‐5  ‐ ‐
5  1”‐3/8”  ‐  ‐  ‐ 100 90‐100 40‐75 15‐35 0‐15  0‐5 ‐
57  1”‐No 4  ‐  ‐  ‐ 100 95‐100 ‐ 25‐60 ‐  0‐10 0‐5

69 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

No, DEL  TAMAÑO 
PORCENTAJE QUE PASA 
TAMAÑO  NOMINAL DE 
(NOTA1)  ABERTURA  3”  2½”  2”  1½”  1”  ¾”  ½”  3/8”  No. 4  No. 8 
NOTA 1: LAS GRADUACIONES DEL NUMERO 24, 25, 3, 4A Y 4 SON PARA LINEAS PRINCIPALES. LAS GRADUACIONES DEL NUMERO 5 Y 57 SON PARA PATIOS, 
AMBAS CONSTRUIDAS CON BALASTO. 

5.4.1.2. Material 
El  material  a  utilizar  para  el  balasto  será  proveniente  de  Roca  Ígnea  tal  como  lo  establecen  los 
términos de referencia y las especificaciones técnicas de FONATUR. 

5.4.1.3. Forma de la particular 
Deberá  contener  como  mínimo  el  60%  en  peso  de  partículas  angulosas  o  trituradas  dentro  del 
material aprovechable y cuando menos el 75% de las partículas en peso; deberá tener dos o más 
caras  formadas  por  la  fractura  de  piedra.  El  Balasto  no  deberá  contener  más  del  30%  en  peso 
constituido por partículas planas. 

5.4.2. Sub‐balasto 
El sub‐balasto puede definirse, según la norma mexicana PROY‐NOM‐003‐ARTF‐2018 como la capa 
de  material  graduado  que  se  coloca  sobre  la  superficie  terminada  de  la  rasante  del  terraplén 
y debajo del balasto para proporcionar mejor drenaje y distribución de la carga al lecho de la vía. 

Las propiedades del subbalasto, así como los métodos de prueba establecidas por la AREMA son 
variables dependiendo las características físicas y químicas del balasto y la subrasante. Sin embargo, 
estos valores pueden ser definidos por las dependencias ferroviarias de cada sitio. Para este caso se 
han tomado los valores límites establecidos en el MANUAL DE CALIDAD PARA MATERIALES EN LA 
SECCIÓN ESTRUCTURAL DE VÍAS FERRAS, de la SCT y el IMT así como de la Especificación Técnica 
para el suministro de Subbalasto compartida por FONATUR. 

Las características recomendadas por el MANUAL DE CALIDAD PARA MATERIALES EN LA SECCIÓN 
ESTRUCTURAL DE VÍAS FERRAS, de la SCT y el IMT para el sub‐balasto aparecen en la Tabla 12. 

TABLA 12 CARACTERÍSTICAS DEL MATERIAL A USAR EN LA CAPA DE SUB‐BALASTO. MANUAL DE CALIDAD DE LOS 
MATERIALES 

CALIDAD
CARACTERÍSTICAS 
DESEABLE ADECUADA 
Granulometría: Zona Granulométrica  1 y 2 (ver Figura 4) 1 y 2 (ver Figura 4) 

Tamaño máximo (mm)  51  51 

Finos (%) (Mat. < 0.074 mm)  15  25 max 

Límite Líquido (LL %)  25 min  30 min 

70 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

CALIDAD
CARACTERÍSTICAS 
DESEABLE ADECUADA 
Índice Plástico (IP % )  6 max  10 max 

Índice Durabilidad (%) 40 min 35 min 


Compactación (%)  100 min 100 min 
V.R.S. (%)  40 min 30 min 
Peso Volumétrico seco máximo (kg/m3) 1700 min   

 
FIGURA 4CURVAS GRANULOMÉTRICAS PARA SUB‐BALASTO. MANUAL DE CALIDAD PARA MATERIALES. 

Para las Vías Férreas Tipo I se recomienda cumplir con una calidad DESEABLE en el material que se 
ocupará para Sub‐balasto. 

71 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Las  características  recomendadas  por  Especificación  Técnica  para  el  suministro  de  Subbalasto 
compartida por FONATUR para el sub‐balasto aparecen en la Tabla 13. 

TABLA 13 CARACTERÍSTICAS DEL MATERIAL A USAR EN LA CAPA DE SUB‐BALASTO. ESPECIFICACIÓN TÉCNICA FONATUR 

CALIDAD 
CARACTERÍSTICAS 
DESEADA 
Tamaño máximo (mm)  31.5 

Finos (%) (Mat. < 0.074 mm)  3‐5 

Equivalente de Arena 45 min 
Coeficiente de desgaste de Los Ángeles (CLA) (%) 28 max 
Coeficiente de Micro‐Deval Húmeda (MDH) (%) 22 max 
Coeficiente de permeabilidad vertical (K)  10‐6 m/s max 
Peso Volumétrico seco máximo (kg/m3)   

5.4.3. Subrasante 
Generalmente es el terreno natural en la cual se apoya toda la estructura del ferrocarril, es decir 
que no forma parte de la estructura en sí.  

Las características de la subrasante se muestran en la Tabla 14 Características del material a usar en 
la capa de subrasante. Manual de CAlidad de los materiales Tabla 14. 

TABLA 14 CARACTERÍSTICAS DEL MATERIAL A USAR EN LA CAPA DE SUBRASANTE. MANUAL DE CALIDAD DE LOS 
MATERIALES 

CALIDAD
CARACTERÍSTICAS 
DESEABLE ADECUADA  TOLERABLE
Granulometría: Tamaño Máximo  76  76  76

Finos (%) (Mat. < 0.074 mm)  20 max  25 max  30 max

Límite Líquido (LL %)  30 max  40 max  50 max

Índice Plástico (IP % )  10 max  20 max  25 max

Compactación (%)  (1)  100 min  100 ± 2  100 ± 2 


V.R.S. (%) (2)  30 min 20 min 15 min

72 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

CALIDAD
CARACTERÍSTICAS 
DESEABLE ADECUADA  TOLERABLE
Peso Volumétrico seco máximo (kg/m3)  1600 min  1600 min   

(1) Con humedad de compactación hasta 3% mayor a la óptima de la prueba.


(2) Al porcentaje de compactación indicado y con contenido de agua recomendable la del material 
en el banco, a 1.5 m de profundidad. 
 

5.4.4. Terraplenes 
Las características de los terraplenes de la plataforma ferroviaria se muestran en la Tabla 15.  

TABLA 15 CARACTERÍSTICA DE LOS TERRAPLENES. MANUAL DE CALIDAD DE LOS MATERIALES. 

CALIDAD
CARACTERÍSTICAS 
DESEABLE ADECUADA TOLERABLE
80% min <76 y 95% 
Granulometría (1) (mm)  80% min <750  ‐‐‐‐‐‐ 
min <200 

1000 o ½ espesor del  1500 o ½ espesor del 
Tamaño Máximo (mm)   
cuerpo  cuerpo 
Finos (%) (Mat. < 0.074 
30 max  40 max  40 max 
mm) 

Límite Líquido (LL %)  40 max  50 max  60 max 


Índice Plástico (IP % )  15 max  20 max  25 max 

Compactación (%)  (1)  95 min  95 ± 2  90 ± 2 


V.R.S. (%) (2)  10 min 10 min 5 min 
Expansión (%)  3 max 3 max 3 max 
(1) Porcentaje en volumen 
(2) Con humedad de compactación igual o ligeramente mayor a la óptima de la prueba 
(3) Al porcentaje de compactación indicado y contenido de agua recomendable la del material 
en el banco, a 1.5 m de profundidad. 
 

En el ANEXO 2: RESUMEN DE ANÁLSIS DE LOS MATERIALES se presenta el listado de los bancos de 
materiales estudiados y clasificados para cada tipo de material.  

5.4.5. Terraplenes en zonas encharcables 
Las características de los terraplenes de la plataforma ferroviaria se muestran en la tabla siguiente: 

73 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TABLA 16 CARACTERÍSTICA DE LOS TERRAPLENES EN ZONAS ENCHARCABLES. MANUAL DE CALIDAD DE LOS MATERIALES Y 
ADIF. 

LIMITACIÓN PARA Z. 
   APTO CORONACIÓN ADIF  DESEABLE SCT 
ENCHARCABLE 
FINOS %  40 MAX (60UNE = 60MM)  30 MAX (<0.074)  15 MAX 

LL  <40  <40  <40 

IP  <15  <15  <15 

CBR  >10  >10  >10 

Tamaño máx. mm  <10CM ó <2/3 tongada  <10cm ó 1/2 e. cuerpo  <10CM ó <2/3 tongada 

Por lo tanto, para estas zonas se propone un material que cumpla con las características destacadas 
en  la  tabla  anterior,  en  un  espesor  hasta  50  cm  por  encima  de  la  cota  de  encharcamiento 
determinada. Además, entre esta capa y la subrasante se ha de introducir una capa de transición de 
50 cm con especificaciones técnicas similares a la de la capa de relleno, capa denominada “capa 
subyacente”. 

5.5. CORTES 
En todo el tramo se presentan escasas zonas de corte, en comparación a las zonas de terraplén. 
Estas zonas estarán definidas en los planos de planta y perfil. A continuación, se presentan las tablas 
por  subtramos  con  los  cadenamientos  en  los  cuales,  según  la  topografía,  el  trazo  y  secciones 
proyectadas se requiere cortar el terreno natural. 

TABLA 17 VOLUMEN DE CORTE PARA EL TRAMO DEL [ADMINISTRADOR] 

Áreas  Semi‐  Volumen 


Cadenamiento 
Corte  distancia  Corte 
5000+000.00  0.00       
5000+020.00  0.00  10.00  0.00 
5000+040.00  0.00  10.00  0.00 
5000+060.00  0.00  10.00  0.00 
5000+080.00  0.00  10.00  0.00 
5000+100.00  0.00  10.00  0.00 
5000+120.00  0.00  10.00  0.00 
5000+140.00  0.00  10.00  0.00 
5000+160.00  0.00  10.00  0.00 
5000+180.00  0.00  10.00  0.00 
5000+200.00  0.00  10.00  0.00 
5000+220.00  0.00  10.00  0.00 
5000+240.00  0.00  10.00  0.00 
5000+260.00  0.00  10.00  0.00 
5000+280.00  0.00  10.00  0.00 

74 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5000+300.00  0.00  10.00  0.00 


5000+320.00  0.00  10.00  0.00 
5000+340.00  0.00  10.00  0.00 
5000+360.00  0.00  10.00  0.00 
5000+380.00  0.00  10.00  0.00 
5000+400.00  0.00  10.00  0.00 
5000+420.00  0.00  10.00  0.00 
5000+440.00  0.00  10.00  0.00 
5000+440.00  0.00  0.00  0.00 
5000+460.00  0.00  10.00  0.00 
5000+480.00  0.00  10.00  0.00 
5000+500.00  0.00  10.00  0.00 
5000+520.00  0.00  10.00  0.00 
5000+540.00  0.00  10.00  0.00 
5000+560.00  0.00  10.00  0.00 
5000+580.00  0.71  10.00  7.06 
5000+600.00  0.00  10.00  7.06 
5000+620.00  0.00  10.00  0.00 
5000+640.00  0.00  10.00  0.00 
5000+660.00  0.00  10.00  0.00 
5000+680.00  0.00  10.00  0.00 
5000+700.00  0.00  10.00  0.00 
5000+720.00  0.00  10.00  0.00 
5000+740.00  0.00  10.00  0.00 
5000+760.00  0.00  10.00  0.00 
5000+780.00  0.00  10.00  0.00 
5000+800.00  0.00  10.00  0.00 
5000+820.00  0.00  10.00  0.00 
5000+840.00  0.00  10.00  0.00 
5000+860.00  0.00  10.00  0.00 
5000+880.00  0.00  10.00  0.00 
5000+900.00  0.00  10.00  0.00 
5000+920.00  0.00  10.00  0.00 
5000+940.00  0.00  10.00  0.00 
5000+960.00  0.00  10.00  0.00 
5000+960.00  0.00  0.00  0.00 
5000+980.00  0.00  10.00  0.00 
5001+000.00  0.00  10.00  0.00 
5001+020.00  0.00  10.00  0.00 
5001+040.00  0.00  10.00  0.00 
5001+060.00  0.00  10.00  0.00 
5001+080.00  0.00  10.00  0.00 
5001+100.00  0.00  10.00  0.00 
5001+120.00  0.00  10.00  0.00 
5001+140.00  0.00  10.00  0.00 
5001+160.00  0.00  10.00  0.00 
5001+180.00  0.00  10.00  0.00 
5001+200.00  0.00  10.00  0.00 
5001+220.00  0.00  10.00  0.00 
5001+240.00  0.00  10.00  0.00 
5001+260.00  0.00  10.00  0.00 

75 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5001+280.00  0.00  10.00  0.00 


5001+300.00  0.00  10.00  0.00 
5001+320.00  0.00  10.00  0.00 
5001+340.00  0.00  10.00  0.00 
5001+360.00  0.00  10.00  0.00 
5001+380.00  0.00  10.00  0.00 
5001+400.00  0.00  10.00  0.00 
5001+420.00  0.00  10.00  0.00 
5001+440.00  0.00  10.00  0.00 
5001+460.00  0.00  10.00  0.00 
5001+480.00  0.00  10.00  0.00 
5001+500.00  0.00  10.00  0.00 
5001+520.00  1.45  10.00  14.48 
5001+540.00  0.00  10.00  14.48 
5001+560.00  0.98  10.00  9.81 
5001+580.00  1.09  10.00  20.74 
5001+600.00  0.00  10.00  10.93 
5001+620.00  0.00  10.00  0.00 
5001+640.00  0.00  10.00  0.00 
5001+660.00  0.00  10.00  0.00 
5001+680.00  0.00  10.00  0.00 
5001+700.00  0.00  10.00  0.00 
5001+720.00  0.00  10.00  0.00 
5001+740.00  0.00  10.00  0.00 
5001+760.00  3.14  10.00  31.36 
5001+780.00  0.00  10.00  31.36 
5001+800.00  0.00  10.00  0.00 
5001+820.00  0.00  10.00  0.00 
5001+840.00  0.00  10.00  0.00 
5001+860.00  0.00  10.00  0.00 
5001+880.00  5.69  10.00  56.89 
5001+900.00  2.35  10.00  80.36 
5001+920.00  0.00  10.00  23.47 
5001+940.00  0.88  10.00  8.81 
5001+960.00  0.82  10.00  16.98 
5001+980.00  0.00  10.00  8.17 
5002+000.00  0.00  10.00  0.00 
5002+020.00  0.00  10.00  0.00 
5002+040.00  0.00  10.00  0.00 
5002+060.00  0.00  10.00  0.00 
5002+080.00  0.00  10.00  0.00 
5002+100.00  0.00  10.00  0.00 
5002+120.00  0.00  10.00  0.00 
5002+140.00  0.00  10.00  0.00 
5002+160.00  0.00  10.00  0.00 
5002+180.00  0.00  10.00  0.00 
5002+200.00  0.00  10.00  0.00 
5002+220.00  0.00  10.00  0.00 
5002+240.00  0.91  10.00  9.08 
5002+260.00  0.79  10.00  17.00 
5002+280.00  0.97  10.00  17.63 

76 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5002+300.00  1.26  10.00  22.34 


5002+320.00  0.00  10.00  12.63 
5002+340.00  0.00  10.00  0.00 
5002+360.00  0.00  10.00  0.00 
5002+380.00  0.00  10.00  0.00 
5002+400.00  0.00  10.00  0.00 
5002+420.00  0.00  10.00  0.00 
5002+440.00  0.00  10.00  0.00 
5002+460.00  0.76  10.00  7.60 
5002+480.00  0.68  10.00  14.38 
5002+500.00  0.00  10.00  6.78 
5002+520.00  0.00  10.00  0.00 
5002+540.00  0.00  10.00  0.00 
5002+560.00  0.00  10.00  0.00 
5002+580.00  0.00  10.00  0.00 
5002+600.00  0.00  10.00  0.00 
5002+620.00  0.00  10.00  0.00 
5002+640.00  0.00  10.00  0.00 
5002+660.00  0.00  10.00  0.00 
5002+680.00  0.00  10.00  0.00 
5002+700.00  0.90  10.00  8.99 
5002+720.00  0.00  10.00  8.99 
5002+740.00  0.00  10.00  0.00 
5002+745.00  0.00  2.50  0.00 
5002+745.00  0.00  0.00  0.00 
5002+760.00  0.00  7.50  0.00 
5002+780.00  0.00  10.00  0.00 
5002+800.00  0.00  10.00  0.00 
5002+820.00  0.00  10.00  0.00 
5002+840.00  0.00  10.00  0.00 
5002+860.00  0.00  10.00  0.00 
5002+880.00  0.00  10.00  0.00 
5002+900.00  0.00  10.00  0.00 
5002+920.00  0.00  10.00  0.00 
5002+940.00  0.00  10.00  0.00 
5002+960.00  0.00  10.00  0.00 
5002+980.00  0.00  10.00  0.00 
5003+000.00  0.00  10.00  0.00 
5003+020.00  0.00  10.00  0.00 
5003+040.00  0.00  10.00  0.00 
5003+060.00  0.00  10.00  0.00 
5003+080.00  0.00  10.00  0.00 
5003+100.00  0.00  10.00  0.00 
5003+120.00  0.00  10.00  0.00 
5003+140.00  0.00  10.00  0.00 
5003+160.00  0.00  10.00  0.00 
5003+180.00  0.00  10.00  0.00 
5003+200.00  0.00  10.00  0.00 
5003+220.00  0.00  10.00  0.00 
5003+240.00  0.00  10.00  0.00 
5003+260.00  0.00  10.00  0.00 

77 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5003+280.00  0.00  10.00  0.00 


5003+300.00  0.00  10.00  0.00 
5003+320.00  0.00  10.00  0.00 
5003+340.00  0.00  10.00  0.00 
5003+360.00  0.00  10.00  0.00 
5003+380.00  0.00  10.00  0.00 
5003+400.00  0.00  10.00  0.00 
5003+420.00  0.00  10.00  0.00 
5003+440.00  0.00  10.00  0.00 
5003+460.00  0.00  10.00  0.00 
5003+480.00  0.00  10.00  0.00 
5003+490.00  0.00  5.00  0.00 
5003+490.00  0.00  0.00  0.00 
5003+500.00  0.00  5.00  0.00 
5003+520.00  0.00  10.00  0.00 
5003+540.00  0.00  10.00  0.00 
5003+560.00  0.00  10.00  0.00 
5003+580.00  0.00  10.00  0.00 
5003+600.00  0.00  10.00  0.00 
5003+620.00  0.00  10.00  0.00 
5003+640.00  0.00  10.00  0.00 
5003+660.00  0.00  10.00  0.00 
5003+680.00  0.00  10.00  0.00 
5003+700.00  0.00  10.00  0.00 
5003+720.00  0.00  10.00  0.00 
5003+740.00  0.00  10.00  0.00 
5003+760.00  0.00  10.00  0.00 
5003+780.00  0.00  10.00  0.00 
5003+800.00  0.00  10.00  0.00 
5003+820.00  0.00  10.00  0.00 
5003+840.00  0.00  10.00  0.00 
5003+860.00  0.00  10.00  0.00 
5003+880.00  0.00  10.00  0.00 
5003+900.00  0.00  10.00  0.00 
5003+920.00  0.00  10.00  0.00 
5003+940.00  0.00  10.00  0.00 
5003+960.00  0.00  10.00  0.00 
5003+980.00  0.00  10.00  0.00 
5004+000.00  0.00  10.00  0.00 
5004+020.00  0.00  10.00  0.00 
5004+040.00  0.18  10.00  1.78 
5004+060.00  0.00  10.00  1.78 
5004+080.00  0.39  10.00  3.91 
5004+100.00  0.50  10.00  8.87 
5004+120.00  0.38  10.00  8.75 
5004+140.00  0.77  10.00  11.51 
5004+160.00  0.33  10.00  11.05 
5004+180.00  0.17  10.00  4.98 
5004+200.00  0.00  10.00  1.65 
5004+220.00  0.00  10.00  0.00 
5004+240.00  0.00  10.00  0.00 

78 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5004+260.00  0.00  10.00  0.00 


5004+280.00  0.00  10.00  0.00 
5004+300.00  0.28  10.00  2.80 
5004+310.00  0.25  5.00  2.65 
5004+310.00  0.32  0.00  0.00 
5004+320.00  0.29  5.00  3.06 
5004+340.00  0.45  10.00  7.41 
5004+360.00  0.00  10.00  4.48 
5004+380.00  0.00  10.00  0.00 
5004+400.00  0.25  10.00  2.49 
5004+420.00  0.00  10.00  2.49 
5004+440.00  0.00  10.00  0.00 
5004+460.00  0.15  10.00  1.48 
5004+480.00  0.00  10.00  1.48 
5004+490.00  0.00  5.00  0.00 
5004+490.00  0.00  0.00  0.00 
5004+500.00  0.91  5.00  4.54 
5004+520.00  0.00  10.00  9.07 
5004+540.00  0.00  10.00  0.00 
5004+560.00  0.00  10.00  0.00 
5004+580.00  0.00  10.00  0.00 
5004+600.00  0.00  10.00  0.00 
5004+620.00  0.00  10.00  0.00 
5004+640.00  0.00  10.00  0.00 
5004+660.00  0.00  10.00  0.00 
5004+680.00  0.00  10.00  0.00 
5004+700.00  0.00  10.00  0.00 
5004+720.00  0.00  10.00  0.00 
5004+740.00  0.00  10.00  0.00 
5004+760.00  0.00  10.00  0.00 
5004+780.00  0.00  10.00  0.00 
5004+800.00  0.00  10.00  0.00 
5004+800.00  0.00  0.00  0.00 
5004+820.00  0.00  10.00  0.00 
5004+840.00  0.00  10.00  0.00 
5004+860.00  0.00  10.00  0.00 
5004+880.00  0.00  10.00  0.00 
5004+900.00  0.00  10.00  0.00 
5004+920.00  0.00  10.00  0.00 
5004+940.00  0.00  10.00  0.00 
5004+960.00  0.00  10.00  0.00 
5004+980.00  0.00  10.00  0.00 
5004+980.00  0.00  0.00  0.00 
5005+000.00  0.00  10.00  0.00 
5005+020.00  0.00  10.00  0.00 
5005+040.00  0.00  10.00  0.00 
5005+060.00  0.00  10.00  0.00 
5005+080.00  0.00  10.00  0.00 
5005+100.00  0.00  10.00  0.00 
5005+120.00  0.00  10.00  0.00 
5005+140.00  0.00  10.00  0.00 

79 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5005+160.00  0.00  10.00  0.00 


5005+180.00  0.00  10.00  0.00 
5005+200.00  0.00  10.00  0.00 
5005+220.00  0.00  10.00  0.00 
5005+240.00  0.00  10.00  0.00 
5005+260.00  0.00  10.00  0.00 
5005+280.00  0.00  10.00  0.00 
5005+300.00  0.00  10.00  0.00 
5005+320.00  0.00  10.00  0.00 
5005+340.00  0.00  10.00  0.00 
5005+360.00  0.00  10.00  0.00 
5005+380.00  0.00  10.00  0.00 
5005+400.00  0.44  10.00  4.38 
5005+420.00  0.46  10.00  8.98 
5005+440.00  0.00  10.00  4.60 
5005+460.00  0.00  10.00  0.00 
5005+480.00  0.00  10.00  0.00 
5005+500.00  0.00  10.00  0.00 
5005+520.00  0.00  10.00  0.00 
5005+540.00  0.00  10.00  0.00 
5005+560.00  0.00  10.00  0.00 
5005+580.00  0.00  10.00  0.00 
5005+600.00  0.00  10.00  0.00 
5005+620.00  0.00  10.00  0.00 
5005+640.00  0.00  10.00  0.00 
5005+660.00  0.00  10.00  0.00 
5005+680.00  0.00  10.00  0.00 
5005+680.00  0.00  0.00  0.00 
5005+700.00  0.00  10.00  0.00 
5005+720.00  0.00  10.00  0.00 
5005+740.00  0.00  10.00  0.00 
5005+760.00  0.00  10.00  0.00 
5005+780.00  0.00  10.00  0.00 
5005+800.00  0.00  10.00  0.00 
5005+820.00  0.00  10.00  0.00 
5005+840.00  0.00  10.00  0.00 
5005+860.00  0.00  10.00  0.00 
5005+880.00  0.00  10.00  0.00 
5005+890.00  0.00  5.00  0.00 
5005+890.00  0.00  0.00  0.00 
5005+900.00  0.00  5.00  0.00 
5005+920.00  0.00  10.00  0.00 
5005+940.00  0.00  10.00  0.00 
5005+960.00  0.00  10.00  0.00 
5005+980.00  0.00  10.00  0.00 
5006+000.00  0.00  10.00  0.00 
5006+020.00  0.00  10.00  0.00 
5006+040.00  0.00  10.00  0.00 
5006+060.00  0.00  10.00  0.00 
5006+080.00  0.00  10.00  0.00 
5006+100.00  0.00  10.00  0.00 

80 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5006+120.00  0.00  10.00  0.00 


5006+140.00  0.00  10.00  0.00 
5006+160.00  0.00  10.00  0.00 
5006+180.00  0.00  10.00  0.00 
5006+200.00  0.00  10.00  0.00 
5006+220.00  0.00  10.00  0.00 
5006+240.00  0.00  10.00  0.00 
5006+260.00  0.00  10.00  0.00 
5006+280.00  0.00  10.00  0.00 
5006+300.00  0.00  10.00  0.00 
5006+310.00  0.00  5.00  0.00 
5006+310.00  0.00  0.00  0.00 
5006+320.00  0.00  5.00  0.00 
5006+340.00  0.00  10.00  0.00 
5006+360.00  0.00  10.00  0.00 
5006+380.00  0.00  10.00  0.00 
5006+400.00  0.00  10.00  0.00 
5006+420.00  0.00  10.00  0.00 
5006+440.00  0.00  10.00  0.00 
5006+460.00  0.00  10.00  0.00 
5006+480.00  0.00  10.00  0.00 
5006+500.00  0.00  10.00  0.00 
5006+520.00  0.00  10.00  0.00 
5006+540.00  0.00  10.00  0.00 
5006+560.00  0.00  10.00  0.00 
5006+580.00  0.00  10.00  0.00 
5006+600.00  0.00  10.00  0.00 
5006+620.00  0.00  10.00  0.00 
5006+640.00  0.00  10.00  0.00 
5006+660.00  0.00  10.00  0.00 
5006+680.00  0.00  10.00  0.00 
5006+700.00  0.00  10.00  0.00 
5006+720.00  1.57  10.00  15.65 
5006+740.00  0.70  10.00  22.69 
5006+760.00  0.66  10.00  13.68 
5006+780.00  0.00  10.00  6.64 
5006+790.00  0.77  5.00  3.84 
5006+800.00  0.57  5.00  6.70 
5006+810.00  9.45  5.00  50.11 
5006+820.00  0.00  5.00  47.25 
5006+830.00  0.00  5.00  0.00 
5006+840.00  0.00  5.00  0.00 
5006+850.00  0.00  5.00  0.00 
5006+860.00  0.00  5.00  0.00 
5006+870.00  0.00  5.00  0.00 
5006+880.00  0.00  5.00  0.00 
5006+890.00  0.00  5.00  0.00 
5006+900.00  0.00  5.00  0.00 
5006+910.00  0.00  5.00  0.00 
5006+920.00  0.00  5.00  0.00 
5006+930.00  0.00  5.00  0.00 

81 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5006+940.00  0.00  5.00  0.00 


5006+950.00  0.00  5.00  0.00 
5006+960.00  0.00  5.00  0.00 
5006+970.00  0.00  5.00  0.00 
5006+980.00  0.00  5.00  0.00 
5007+000.00  0.00  10.00  0.00 
5007+020.00  0.00  10.00  0.00 
5007+040.00  0.00  10.00  0.00 
5007+060.00  0.00  10.00  0.00 
5007+080.00  0.00  10.00  0.00 
5007+100.00  0.00  10.00  0.00 
5007+120.00  0.00  10.00  0.00 
5007+140.00  0.00  10.00  0.00 
5007+160.00  0.00  10.00  0.00 
5007+180.00  0.00  10.00  0.00 
5007+180.00  0.00  0.00  0.00 
5007+200.00  0.00  10.00  0.00 
5007+220.00  0.00  10.00  0.00 
5007+240.00  0.00  10.00  0.00 
5007+260.00  0.00  10.00  0.00 
5007+280.00  0.00  10.00  0.00 
5007+300.00  0.00  10.00  0.00 
5007+320.00  0.00  10.00  0.00 
5007+340.00  0.00  10.00  0.00 
5007+360.00  0.00  10.00  0.00 
5007+360.00  0.00  0.00  0.00 
5007+380.00  0.00  10.00  0.00 
5007+400.00  0.00  10.00  0.00 
5007+420.00  0.00  10.00  0.00 
5007+440.00  0.00  10.00  0.00 
5007+460.00  0.00  10.00  0.00 
5007+480.00  0.00  10.00  0.00 
5007+500.00  0.00  10.00  0.00 
5007+520.00  0.00  10.00  0.00 
5007+540.00  0.00  10.00  0.00 
5007+560.00  0.00  10.00  0.00 
5007+580.00  0.00  10.00  0.00 
5007+600.00  0.00  10.00  0.00 
5007+620.00  0.00  10.00  0.00 
5007+640.00  0.00  10.00  0.00 
5007+660.00  0.00  10.00  0.00 
5007+680.00  0.00  10.00  0.00 
5007+700.00  0.00  10.00  0.00 
5007+720.00  0.00  10.00  0.00 
5007+740.00  0.00  10.00  0.00 
5007+760.00  0.00  10.00  0.00 
5007+780.00  0.00  10.00  0.00 
5007+800.00  0.00  10.00  0.00 
5007+820.00  0.00  10.00  0.00 
5007+840.00  0.00  10.00  0.00 
5007+860.00  0.00  10.00  0.00 

82 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5007+880.00  0.00  10.00  0.00 


5007+900.00  0.00  10.00  0.00 
5007+920.00  0.00  10.00  0.00 
5007+940.00  0.00  10.00  0.00 
5007+960.00  0.00  10.00  0.00 
5007+980.00  0.00  10.00  0.00 
5008+000.00  0.00  10.00  0.00 
5008+020.00  0.00  10.00  0.00 
5008+040.00  0.00  10.00  0.00 
5008+060.00  0.00  10.00  0.00 
5008+080.00  0.00  10.00  0.00 
5008+100.00  0.00  10.00  0.00 
5008+120.00  0.00  10.00  0.00 
5008+140.00  0.00  10.00  0.00 
5008+155.00  0.00  7.50  0.00 
5008+155.00  0.00  0.00  0.00 
5008+160.00  0.00  2.50  0.00 
5008+180.00  0.00  10.00  0.00 
5008+200.00  0.00  10.00  0.00 
5008+220.00  0.00  10.00  0.00 
5008+240.00  0.13  10.00  1.34 
5008+260.00  0.00  10.00  1.34 
5008+280.00  0.00  10.00  0.00 
5008+300.00  0.00  10.00  0.00 
5008+320.00  0.00  10.00  0.00 
5008+340.00  0.00  10.00  0.00 
5008+360.00  0.00  10.00  0.00 
5008+380.00  0.00  10.00  0.00 
5008+380.00  0.00  0.00  0.00 
5008+400.00  0.00  10.00  0.00 
5008+420.00  0.00  10.00  0.00 
5008+440.00  0.00  10.00  0.00 
5008+460.00  0.00  10.00  0.00 
5008+470.00  0.00  5.00  0.00 
5008+480.00  0.64  5.00  3.20 
5008+490.00  0.00  5.00  3.20 
5008+500.00  0.00  5.00  0.00 
5008+510.00  0.00  5.00  0.00 
5008+520.00  0.00  5.00  0.00 
5008+530.00  0.00  5.00  0.00 
5008+540.00  0.00  5.00  0.00 
5008+550.00  0.00  5.00  0.00 
5008+560.00  0.00  5.00  0.00 
5008+570.00  0.00  5.00  0.00 
5008+580.00  0.00  5.00  0.00 
5008+590.00  0.00  5.00  0.00 
5008+600.00  0.00  5.00  0.00 
5008+610.00  0.00  5.00  0.00 
5008+620.00  0.00  5.00  0.00 
5008+629.97  0.00  4.98  0.00 
5008+629.97  0.00  0.00  0.00 

83 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5008+640.00  0.00  5.01  0.00 


5008+649.97  0.00  4.98  0.00 
5008+649.97  0.00  0.00  0.00 
5008+660.00  0.00  5.01  0.00 
5008+680.00  0.00  10.00  0.00 
5008+700.00  0.00  10.00  0.00 
5008+720.00  0.57  10.00  5.72 
5008+740.00  0.00  10.00  5.72 
5008+760.00  0.00  10.00  0.00 
5008+780.00  0.00  10.00  0.00 
5008+800.00  0.00  10.00  0.00 
5008+820.00  0.00  10.00  0.00 
5008+840.00  0.00  10.00  0.00 
5008+860.00  0.00  10.00  0.00 
5008+880.00  0.00  10.00  0.00 
5008+900.00  0.00  10.00  0.00 
5008+920.00  0.00  10.00  0.00 
5008+940.00  0.00  10.00  0.00 
5008+960.00  0.00  10.00  0.00 
5008+980.00  0.00  10.00  0.00 
5009+000.00  0.00  10.00  0.00 
5009+020.00  0.00  10.00  0.00 
5009+040.00  0.00  10.00  0.00 
5009+060.00  0.00  10.00  0.00 
5009+080.00  0.00  10.00  0.00 
5009+090.00  0.00  5.00  0.00 
5009+090.00  0.00  0.00  0.00 
5009+100.00  0.00  5.00  0.00 
5009+120.00  0.00  10.00  0.00 
5009+130.00  0.00  5.00  0.00 
5009+140.00  0.00  5.00  0.00 
5009+160.00  0.00  10.00  0.00 
5009+180.00  0.00  10.00  0.00 
5009+200.00  0.00  10.00  0.00 
5009+200.00  0.00  0.00  0.00 
5009+220.00  0.00  10.00  0.00 
5009+240.00  0.00  10.00  0.00 
5009+260.00  0.00  10.00  0.00 
5009+280.00  0.00  10.00  0.00 
5009+300.00  0.00  10.00  0.00 
5009+320.00  0.00  10.00  0.00 
5009+340.00  0.00  10.00  0.00 
5009+360.00  0.00  10.00  0.00 
5009+380.00  0.00  10.00  0.00 
5009+400.00  0.10  10.00  0.95 
5009+420.00  0.00  10.00  0.95 
5009+440.00  0.00  10.00  0.00 
5009+460.00  0.00  10.00  0.00 
5009+480.00  0.00  10.00  0.00 
5009+500.00  0.00  10.00  0.00 
5009+520.00  0.00  10.00  0.00 

84 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5009+540.00  0.00  10.00  0.00 


5009+560.00  0.00  10.00  0.00 
5009+580.00  0.00  10.00  0.00 
5009+587.89  0.00  3.94  0.00 
5009+600.00  0.00  6.06  0.00 
5009+620.00  0.00  10.00  0.00 
5009+640.00  0.17  10.00  1.70 
5009+660.00  0.21  10.00  3.81 
5009+680.00  0.00  10.00  2.11 
5009+700.00  0.00  10.00  0.00 
5009+717.89  0.00  8.94  0.00 
5009+720.00  0.00  1.06  0.00 
5009+740.00  0.00  10.00  0.00 
5009+760.00  0.00  10.00  0.00 
5009+780.00  0.00  10.00  0.00 
5009+800.00  0.00  10.00  0.00 
5009+817.42  0.00  8.71  0.00 
5009+820.00  0.00  1.29  0.00 
5009+840.00  0.00  10.00  0.00 
5009+850.00  0.00  5.00  0.00 
5009+850.00  0.00  0.00  0.00 
5009+860.00  0.00  5.00  0.00 
5009+880.00  0.00  10.00  0.00 
5009+900.00  0.00  10.00  0.00 
5009+920.00  0.00  10.00  0.00 
5009+940.00  0.00  10.00  0.00 
5009+947.42  0.00  3.71  0.00 
5009+960.00  0.00  6.29  0.00 
5009+980.00  0.00  10.00  0.00 
5010+000.00  0.00  10.00  0.00 
5010+020.00  0.00  10.00  0.00 
5010+040.00  0.00  10.00  0.00 
5010+060.00  0.00  10.00  0.00 
5010+080.00  0.00  10.00  0.00 
5010+100.00  0.00  10.00  0.00 
5010+120.00  0.00  10.00  0.00 
5010+140.00  0.00  10.00  0.00 
5010+160.00  0.00  10.00  0.00 
5010+180.00  0.00  10.00  0.00 
5010+200.00  0.00  10.00  0.00 
5010+220.00  0.00  10.00  0.00 
5010+240.00  0.00  10.00  0.00 
5010+260.00  0.00  10.00  0.00 
5010+280.00  0.69  10.00  6.89 
5010+300.00  0.50  10.00  11.92 
5010+320.00  0.54  10.00  10.46 
5010+340.00  0.91  10.00  14.53 
5010+360.00  0.83  10.00  17.37 
5010+380.00  0.00  10.00  8.27 
5010+400.00  0.00  10.00  0.00 
5010+420.00  0.00  10.00  0.00 

85 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5010+440.00  0.00  10.00  0.00 


5010+460.00  0.00  10.00  0.00 
5010+480.00  0.00  10.00  0.00 
5010+500.00  0.00  10.00  0.00 
5010+520.00  0.00  10.00  0.00 
5010+540.00  0.00  10.00  0.00 
5010+560.00  0.00  10.00  0.00 
5010+580.00  0.00  10.00  0.00 
5010+600.00  0.00  10.00  0.00 
5010+620.00  0.00  10.00  0.00 
5010+640.00  0.00  10.00  0.00 
5010+660.00  0.00  10.00  0.00 
5010+680.00  0.00  10.00  0.00 
5010+700.00  0.56  10.00  5.64 
5010+720.00  0.00  10.00  5.64 
5010+740.00  0.00  10.00  0.00 
5010+760.00  0.62  10.00  6.16 
5010+780.00  0.81  10.00  14.30 
5010+800.00  0.00  10.00  8.14 
5010+820.00  0.00  10.00  0.00 
5010+840.00  0.00  10.00  0.00 
5010+860.00  0.00  10.00  0.00 
5010+880.00  0.00  10.00  0.00 
5010+900.00  0.00  10.00  0.00 
5010+920.00  0.00  10.00  0.00 
5010+940.00  0.00  10.00  0.00 
5010+960.00  0.00  10.00  0.00 
5010+980.00  0.00  10.00  0.00 
5011+000.00  0.00  10.00  0.00 
5011+020.00  0.00  10.00  0.00 
5011+040.00  0.00  10.00  0.00 
5011+060.00  0.00  10.00  0.00 
5011+080.00  0.00  10.00  0.00 
5011+100.00  0.00  10.00  0.00 
5011+120.00  0.52  10.00  5.22 
5011+140.00  0.00  10.00  5.22 
5011+160.00  0.00  10.00  0.00 
5011+180.00  1.39  10.00  13.87 
5011+200.00  0.00  10.00  13.87 
5011+220.00  0.00  10.00  0.00 
5011+240.00  0.00  10.00  0.00 
5011+260.00  0.00  10.00  0.00 
5011+280.00  0.47  10.00  4.73 
5011+300.00  0.00  10.00  4.73 
5011+320.00  0.00  10.00  0.00 
5011+340.00  0.00  10.00  0.00 
5011+360.00  0.00  10.00  0.00 
5011+380.00  0.00  10.00  0.00 
5011+400.00  0.00  10.00  0.00 
5011+420.00  0.00  10.00  0.00 
5011+420.00  0.00  0.00  0.00 

86 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5011+440.00  0.00  10.00  0.00 


5011+460.00  0.00  10.00  0.00 
5011+480.00  0.00  10.00  0.00 
5011+500.00  0.00  10.00  0.00 
5011+520.00  0.00  10.00  0.00 
5011+540.00  0.00  10.00  0.00 
5011+560.00  0.00  10.00  0.00 
5011+580.00  0.00  10.00  0.00 
5011+600.00  0.00  10.00  0.00 
5011+620.00  0.00  10.00  0.00 
5011+640.00  0.00  10.00  0.00 
5011+660.00  0.00  10.00  0.00 
5011+680.00  0.00  10.00  0.00 
5011+700.00  0.00  10.00  0.00 
5011+720.00  0.00  10.00  0.00 
5011+740.00  0.00  10.00  0.00 
5011+760.00  0.00  10.00  0.00 
5011+780.00  0.00  10.00  0.00 
5011+800.00  0.00  10.00  0.00 
5011+820.00  0.00  10.00  0.00 
5011+840.00  0.00  10.00  0.00 
5011+860.00  0.00  10.00  0.00 
5011+880.00  0.00  10.00  0.00 
5011+900.00  0.00  10.00  0.00 
5011+920.00  0.00  10.00  0.00 
5011+940.00  0.00  10.00  0.00 
5011+940.00  0.00  0.00  0.00 
5011+960.00  0.00  10.00  0.00 
5011+980.00  0.00  10.00  0.00 
5012+000.00  0.00  10.00  0.00 
5012+000.00  0.00  0.00  0.00 
5012+020.00  0.00  10.00  0.00 
5012+040.00  0.00  10.00  0.00 
5012+060.00  0.00  10.00  0.00 
5012+080.00  0.00  10.00  0.00 
5012+100.00  0.00  10.00  0.00 
5012+120.00  0.00  10.00  0.00 
5012+140.00  0.00  10.00  0.00 
5012+160.00  0.00  10.00  0.00 
5012+180.00  0.00  10.00  0.00 
5012+200.00  0.00  10.00  0.00 
5012+220.00  0.00  10.00  0.00 
5012+240.00  0.00  10.00  0.00 
5012+260.00  0.00  10.00  0.00 
5012+280.00  0.00  10.00  0.00 
5012+300.00  0.00  10.00  0.00 
5012+320.00  0.00  10.00  0.00 
5012+340.00  0.00  10.00  0.00 
5012+360.00  0.00  10.00  0.00 
5012+380.00  0.00  10.00  0.00 
5012+400.00  0.00  10.00  0.00 

87 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5012+420.00  0.00  10.00  0.00 


5012+420.00  0.00  0.00  0.00 
5012+440.00  0.00  10.00  0.00 
5012+460.00  0.00  10.00  0.00 
5012+480.00  0.03  10.00  0.25 
5012+500.00  0.00  10.00  0.25 
5012+520.00  0.00  10.00  0.00 
5012+540.00  0.00  10.00  0.00 
5012+560.00  0.00  10.00  0.00 
5012+580.00  0.00  10.00  0.00 
5012+600.00  0.00  10.00  0.00 
5012+600.00  0.00  0.00  0.00 
5012+620.00  0.00  10.00  0.00 
5012+640.00  0.00  10.00  0.00 
5012+660.00  0.00  10.00  0.00 
5012+680.00  0.00  10.00  0.00 
5012+700.00  0.00  10.00  0.00 
5012+720.00  0.00  10.00  0.00 
5012+740.00  1.25  10.00  12.46 
5012+760.00  0.78  10.00  20.28 
5012+780.00  0.00  10.00  7.82 
5012+800.00  0.00  10.00  0.00 
5012+820.00  0.00  10.00  0.00 
5012+840.00  0.00  10.00  0.00 
5012+860.00  0.00  10.00  0.00 
5012+880.00  0.00  10.00  0.00 
5012+900.00  0.00  10.00  0.00 
5012+920.00  0.00  10.00  0.00 
5012+940.00  0.00  10.00  0.00 
5012+960.00  0.00  10.00  0.00 
5012+980.00  0.00  10.00  0.00 
5013+000.00  0.00  10.00  0.00 
5013+020.00  0.00  10.00  0.00 
5013+040.00  0.00  10.00  0.00 
5013+060.00  0.00  10.00  0.00 
5013+080.00  0.00  10.00  0.00 
5013+100.00  0.00  10.00  0.00 
5013+120.00  0.00  10.00  0.00 
5013+140.00  0.00  10.00  0.00 
5013+160.00  0.00  10.00  0.00 
5013+180.00  0.00  10.00  0.00 
5013+200.00  0.00  10.00  0.00 
5013+220.00  0.00  10.00  0.00 
5013+235.00  0.00  7.50  0.00 
5013+235.00  0.00  0.00  0.00 
5013+240.00  0.00  2.50  0.00 
5013+260.00  0.00  10.00  0.00 
5013+280.00  0.00  10.00  0.00 
5013+300.00  0.00  10.00  0.00 
5013+320.00  0.00  10.00  0.00 
5013+340.00  0.00  10.00  0.00 

88 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5013+360.00  0.00  10.00  0.00 


5013+380.00  0.00  10.00  0.00 
5013+390.00  0.00  5.00  0.00 
5013+390.00  0.00  0.00  0.00 
5013+400.00  0.00  5.00  0.00 
5013+420.00  0.00  10.00  0.00 
5013+440.00  0.00  10.00  0.00 
5013+460.00  0.00  10.00  0.00 
5013+480.00  0.00  10.00  0.00 
5013+500.00  0.00  10.00  0.00 
5013+520.00  0.00  10.00  0.00 
5013+540.00  0.00  10.00  0.00 
5013+560.00  0.00  10.00  0.00 
5013+580.00  0.00  10.00  0.00 
5013+600.00  0.00  10.00  0.00 
5013+620.00  0.00  10.00  0.00 
5013+640.00  0.00  10.00  0.00 
5013+660.00  0.00  10.00  0.00 
5013+680.00  0.00  10.00  0.00 
5013+700.00  0.00  10.00  0.00 
5013+720.00  0.00  10.00  0.00 
5013+740.00  0.00  10.00  0.00 
5013+760.00  1.16  10.00  11.62 
5013+780.00  1.42  10.00  25.85 
5013+800.00  2.81  10.00  42.37 
5013+820.00  0.00  10.00  28.14 
5013+840.00  0.82  10.00  8.22 
5013+860.00  0.00  10.00  8.22 
5013+880.00  0.00  10.00  0.00 
5013+900.00  0.00  10.00  0.00 
5013+920.00  0.00  10.00  0.00 
5013+940.00  0.00  10.00  0.00 
5013+960.00  0.00  10.00  0.00 
5013+980.00  0.00  10.00  0.00 
5014+000.00  0.00  10.00  0.00 
5014+020.00  0.00  10.00  0.00 
5014+040.00  0.00  10.00  0.00 
5014+060.00  0.00  10.00  0.00 
5014+060.00  0.00  0.00  0.00 
5014+080.00  0.00  10.00  0.00 
5014+100.00  0.00  10.00  0.00 
5014+120.00  0.00  10.00  0.00 
5014+140.00  0.00  10.00  0.00 
5014+160.00  0.00  10.00  0.00 
5014+180.00  0.00  10.00  0.00 
5014+200.00  0.00  10.00  0.00 
5014+220.00  0.00  10.00  0.00 
5014+240.00  0.00  10.00  0.00 
5014+260.00  0.00  10.00  0.00 
5014+280.00  0.00  10.00  0.00 
5014+300.00  0.00  10.00  0.00 

89 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5014+320.00  0.68  10.00  6.83 


5014+340.00  0.38  10.00  10.63 
5014+360.00  1.91  10.00  22.87 
5014+380.00  0.00  10.00  19.07 
5014+400.00  0.00  10.00  0.00 
5014+420.00  0.00  10.00  0.00 
5014+440.00  0.00  10.00  0.00 
5014+460.00  0.00  10.00  0.00 
5014+480.00  0.00  10.00  0.00 
5014+500.00  0.00  10.00  0.00 
5014+520.00  0.00  10.00  0.00 
5014+540.00  0.00  10.00  0.00 
5014+560.00  0.00  10.00  0.00 
5014+580.00  0.00  10.00  0.00 
5014+600.00  0.00  10.00  0.00 
5014+620.00  0.00  10.00  0.00 
5014+640.00  0.00  10.00  0.00 
5014+660.00  0.00  10.00  0.00 
5014+680.00  0.00  10.00  0.00 
5014+700.00  0.00  10.00  0.00 
5014+720.00  0.00  10.00  0.00 
5014+740.00  0.00  10.00  0.00 
5014+760.00  0.00  10.00  0.00 
5014+780.00  0.00  10.00  0.00 
5014+800.00  0.00  10.00  0.00 
5014+820.00  0.00  10.00  0.00 
5014+840.00  0.00  10.00  0.00 
5014+860.00  0.00  10.00  0.00 
5014+880.00  0.00  10.00  0.00 
5014+900.00  0.00  10.00  0.00 
5014+920.00  0.00  10.00  0.00 
5014+940.00  0.00  10.00  0.00 
5014+960.00  0.00  10.00  0.00 
5014+980.00  0.00  10.00  0.00 
5015+000.00  0.00  10.00  0.00 
5015+020.00  0.00  10.00  0.00 
5015+040.00  0.00  10.00  0.00 
5015+060.00  0.00  10.00  0.00 
5015+080.00  0.00  10.00  0.00 
5015+100.00  0.00  10.00  0.00 
5015+120.00  0.00  10.00  0.00 
5015+140.00  0.00  10.00  0.00 
5015+160.00  0.00  10.00  0.00 
5015+180.00  0.00  10.00  0.00 
5015+200.00  0.00  10.00  0.00 
5015+220.00  0.00  10.00  0.00 
5015+240.00  0.00  10.00  0.00 
5015+260.00  0.43  10.00  4.31 
5015+280.00  0.00  10.00  4.31 
5015+300.00  0.00  10.00  0.00 
5015+320.00  0.52  10.00  5.15 

90 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5015+340.00  0.45  10.00  9.68 


5015+360.00  0.00  10.00  4.53 
5015+380.00  0.00  10.00  0.00 
5015+400.00  0.00  10.00  0.00 
5015+420.00  0.00  10.00  0.00 
5015+440.00  0.00  10.00  0.00 
5015+460.00  0.00  10.00  0.00 
5015+480.00  0.00  10.00  0.00 
5015+500.00  0.00  10.00  0.00 
5015+520.00  0.00  10.00  0.00 
5015+540.00  0.00  10.00  0.00 
5015+560.00  0.00  10.00  0.00 
5015+580.00  0.00  10.00  0.00 
5015+600.00  0.00  10.00  0.00 
5015+620.00  0.00  10.00  0.00 
5015+640.00  0.00  10.00  0.00 
5015+660.00  0.00  10.00  0.00 
5015+680.00  0.00  10.00  0.00 
5015+700.00  0.00  10.00  0.00 
5015+720.00  0.00  10.00  0.00 
5015+740.00  0.00  10.00  0.00 
5015+760.00  0.00  10.00  0.00 
5015+780.00  0.00  10.00  0.00 
5015+800.00  0.00  10.00  0.00 
5015+820.00  0.00  10.00  0.00 
5015+830.00  0.00  5.00  0.00 
5015+830.00  0.00  0.00  0.00 
5015+840.00  0.00  5.00  0.00 
5015+860.00  0.00  10.00  0.00 
5015+880.00  0.00  10.00  0.00 
5015+900.00  0.00  10.00  0.00 
5015+920.00  0.00  10.00  0.00 
5015+940.00  0.00  10.00  0.00 
5015+960.00  0.00  10.00  0.00 
5015+980.00  0.00  10.00  0.00 
5016+000.00  0.00  10.00  0.00 
5016+020.00  0.00  10.00  0.00 
5016+040.00  0.00  10.00  0.00 
5016+060.00  0.00  10.00  0.00 
5016+080.00  0.00  10.00  0.00 
5016+100.00  0.00  10.00  0.00 
5016+120.00  0.00  10.00  0.00 
5016+140.00  0.00  10.00  0.00 
5016+160.00  0.00  10.00  0.00 
5016+180.00  0.00  10.00  0.00 
5016+200.00  0.00  10.00  0.00 
5016+220.00  0.00  10.00  0.00 
5016+240.00  0.00  10.00  0.00 
5016+260.00  0.00  10.00  0.00 
5016+280.00  0.00  10.00  0.00 
5016+300.00  0.00  10.00  0.00 

91 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5016+320.00  0.00  10.00  0.00 


5016+340.00  0.00  10.00  0.00 
5016+360.00  0.00  10.00  0.00 
5016+380.00  0.00  10.00  0.00 
5016+400.00  0.00  10.00  0.00 
5016+420.00  0.00  10.00  0.00 
5016+440.00  0.00  10.00  0.00 
5016+460.00  0.00  10.00  0.00 
5016+480.00  0.00  10.00  0.00 
5016+500.00  0.00  10.00  0.00 
5016+520.00  0.00  10.00  0.00 
5016+520.00  0.00  0.00  0.00 
5016+540.00  0.00  10.00  0.00 
5016+560.00  0.00  10.00  0.00 
5016+580.00  0.00  10.00  0.00 
5016+600.00  0.00  10.00  0.00 
5016+600.00  0.00  0.00  0.00 
5016+620.00  0.00  10.00  0.00 
5016+640.00  0.00  10.00  0.00 
5016+660.00  0.00  10.00  0.00 
5016+680.00  0.00  10.00  0.00 
5016+700.00  0.00  10.00  0.00 
5016+720.00  0.00  10.00  0.00 
5016+740.00  0.00  10.00  0.00 
5016+760.00  0.00  10.00  0.00 
5016+780.00  5.80  10.00  57.97 
5016+800.00  7.68  10.00  134.74 
5016+820.00  7.54  10.00  152.13 
5016+840.00  7.56  10.00  150.99 
5016+860.00  8.79  10.00  163.51 
5016+880.00  1.09  10.00  98.78 
5016+900.00  0.00  10.00  10.90 
5016+920.00  0.00  10.00  0.00 
5016+940.00  0.00  10.00  0.00 
5016+960.00  0.00  10.00  0.00 
5016+980.00  0.00  10.00  0.00 
5017+000.00  0.00  10.00  0.00 
5017+020.00  0.00  10.00  0.00 
5017+040.00  0.00  10.00  0.00 
5017+060.00  0.00  10.00  0.00 
5017+080.00  0.00  10.00  0.00 
5017+100.00  0.00  10.00  0.00 
5017+120.00  0.00  10.00  0.00 
5017+140.00  0.00  10.00  0.00 
5017+160.00  0.00  10.00  0.00 
5017+180.00  1.93  10.00  19.32 
5017+200.00  2.84  10.00  47.76 
5017+220.00  0.79  10.00  36.37 
5017+240.00  1.22  10.00  20.15 
5017+260.00  2.91  10.00  41.28 
5017+280.00  5.38  10.00  82.85 

92 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5017+300.00  10.67  10.00  160.49 


5017+320.00  7.26  10.00  179.31 
5017+340.00  2.34  10.00  96.02 
5017+340.00  1.90  0.00  0.00 
5017+360.00  1.41  10.00  33.18 
5017+380.00  0.00  10.00  14.14 
5017+400.00  0.00  10.00  0.00 
5017+420.00  0.00  10.00  0.00 
5017+440.00  0.00  10.00  0.00 
5017+460.00  3.36  10.00  33.63 
5017+480.00  1.75  10.00  51.17 
5017+500.00  0.00  10.00  17.54 
5017+520.00  0.00  10.00  0.00 
5017+540.00  0.00  10.00  0.00 
5017+560.00  0.00  10.00  0.00 
5017+563.95  0.00  1.97  0.00 
5017+580.00  0.00  8.03  0.00 
5017+593.95  0.00  6.97  0.00 
5017+600.00  0.00  3.03  0.00 
5017+620.00  0.00  10.00  0.00 
5017+640.00  0.00  10.00  0.00 
5017+660.00  0.00  10.00  0.00 
5017+678.40  0.00  9.20  0.00 
5017+680.00  0.00  0.80  0.00 
5017+680.00  0.00  0.00  0.00 
5017+700.00  0.00  10.00  0.00 
5017+708.40  0.00  4.20  0.00 
5017+720.00  0.00  5.80  0.00 
5017+740.00  0.00  10.00  0.00 
5017+760.00  0.00  10.00  0.00 
5017+780.00  0.00  10.00  0.00 
5017+800.00  0.00  10.00  0.00 
5017+820.00  0.00  10.00  0.00 
5017+840.00  0.00  10.00  0.00 
5017+860.00  0.00  10.00  0.00 
5017+880.00  0.00  10.00  0.00 
5017+900.00  0.00  10.00  0.00 
5017+920.00  0.00  10.00  0.00 
5017+940.00  0.00  10.00  0.00 
5017+960.00  0.00  10.00  0.00 
5017+980.00  0.00  10.00  0.00 
5018+000.00  0.00  10.00  0.00 
5018+020.00  0.00  10.00  0.00 
5018+040.00  0.00  10.00  0.00 
5018+040.00  0.00  0.00  0.00 
5018+060.00  0.00  10.00  0.00 
5018+080.00  0.00  10.00  0.00 
5018+100.00  0.00  10.00  0.00 
5018+120.00  0.00  10.00  0.00 
5018+140.00  0.00  10.00  0.00 
5018+160.00  0.00  10.00  0.00 

93 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5018+180.00  0.00  10.00  0.00 


5018+200.00  0.00  10.00  0.00 
5018+220.00  0.00  10.00  0.00 
5018+240.00  0.00  10.00  0.00 
5018+260.00  0.00  10.00  0.00 
5018+280.00  0.76  10.00  7.58 
5018+300.00  0.55  10.00  13.09 
5018+320.00  0.00  10.00  5.51 
5018+340.00  0.00  10.00  0.00 
5018+360.00  0.00  10.00  0.00 
5018+380.00  0.00  10.00  0.00 
5018+400.00  0.00  10.00  0.00 
5018+420.00  0.00  10.00  0.00 
5018+440.00  0.00  10.00  0.00 
5018+460.00  0.00  10.00  0.00 
5018+480.00  0.00  10.00  0.00 
5018+500.00  0.00  10.00  0.00 
5018+520.00  0.00  10.00  0.00 
5018+540.00  0.00  10.00  0.00 
5018+560.00  0.00  10.00  0.00 
5018+580.00  0.00  10.00  0.00 
5018+600.00  0.00  10.00  0.00 
5018+620.00  2.06  10.00  20.57 
5018+640.00  1.30  10.00  33.55 
5018+660.00  0.00  10.00  12.98 
5018+680.00  0.00  10.00  0.00 
5018+700.00  1.19  10.00  11.94 
5018+720.00  9.01  10.00  101.99 
5018+740.00  12.34  10.00  213.49 
5018+760.00  2.00  10.00  143.39 
5018+780.00  0.00  10.00  19.95 
5018+800.00  0.00  10.00  0.00 
5018+820.00  0.00  10.00  0.00 
5018+840.00  0.00  10.00  0.00 
5018+860.00  0.00  10.00  0.00 
5018+880.00  0.00  10.00  0.00 
5018+900.00  0.00  10.00  0.00 
5018+920.00  0.00  10.00  0.00 
5018+939.87  0.00  9.93  0.00 
5018+940.00  0.00  0.07  0.00 
5018+960.00  0.00  10.00  0.00 
5018+979.87  0.00  9.93  0.00 
5018+980.00  0.00  0.07  0.00 
5019+000.00  0.00  10.00  0.00 
5019+020.00  3.06  10.00  30.61 
5019+040.00  10.31  10.00  133.67 
5019+060.00  23.10  10.00  334.06 
5019+062.97  21.30  1.48  65.86 
5019+080.00  8.72  8.52  255.62 
5019+100.00  18.48  10.00  271.99 
5019+102.97  17.91  1.48  53.99 

94 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5019+120.00  12.69  8.52  260.60 


5019+140.00  2.25  10.00  149.36 
5019+160.00  1.57  10.00  38.20 
5019+180.00  9.63  10.00  111.95 
5019+200.00  1.86  10.00  114.89 
5019+220.00  0.00  10.00  18.63 
5019+240.00  0.53  10.00  5.25 
5019+260.00  0.00  10.00  5.25 
5019+280.00  2.21  10.00  22.14 
5019+300.00  0.00  10.00  22.14 
5019+320.00  0.00  10.00  0.00 
5019+340.00  0.00  10.00  0.00 
5019+360.00  0.00  10.00  0.00 
5019+380.00  0.00  10.00  0.00 
5019+400.00  0.00  10.00  0.00 
5019+420.00  8.41  10.00  84.07 
5019+440.00  3.84  10.00  122.51 
5019+450.00  0.00  5.00  19.22 
5019+450.00  0.00  0.00  0.00 
5019+450.00  0.00  0.00  0.00 
5019+460.00  0.00  5.00  0.00 
5019+478.00  0.00  9.00  0.00 
5019+478.00  0.00  0.00  0.00 
5019+478.00  0.00  0.00  0.00 
5019+480.00  0.00  1.00  0.00 
5019+500.00  0.00  10.00  0.00 
5019+520.00  0.00  10.00  0.00 
5019+540.00  0.00  10.00  0.00 
5019+560.00  0.00  10.00  0.00 
5019+580.00  0.00  10.00  0.00 
5019+600.00  0.00  10.00  0.00 
5019+620.00  0.00  10.00  0.00 
5019+640.00  0.00  10.00  0.00 
5019+660.00  0.00  10.00  0.00 
5019+680.00  0.00  10.00  0.00 
5019+700.00  0.00  10.00  0.00 
5019+700.00  0.00  0.00  0.00 
5019+720.00  0.00  10.00  0.00 
5019+740.00  0.00  10.00  0.00 
5019+760.00  0.00  10.00  0.00 
5019+780.00  0.00  10.00  0.00 
5019+800.00  0.00  10.00  0.00 
5019+820.00  0.00  10.00  0.00 
5019+840.00  0.00  10.00  0.00 
5019+860.00  0.00  10.00  0.00 
5019+880.00  0.00  10.00  0.00 
5019+900.00  0.00  10.00  0.00 
5019+920.00  0.00  10.00  0.00 
5019+940.00  0.00  10.00  0.00 
5019+960.00  0.00  10.00  0.00 
5019+980.00  0.00  10.00  0.00 

95 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5020+000.00  0.00  10.00  0.00 


5020+020.00  0.00  10.00  0.00 
5020+040.00  0.00  10.00  0.00 
5020+060.00  0.00  10.00  0.00 
5020+080.00  0.00  10.00  0.00 
5020+100.00  0.00  10.00  0.00 
5020+120.00  0.00  10.00  0.00 
5020+140.00  0.00  10.00  0.00 
5020+160.00  0.00  10.00  0.00 
5020+180.00  0.00  10.00  0.00 
5020+200.00  0.00  10.00  0.00 
5020+220.00  0.00  10.00  0.00 
5020+240.00  0.00  10.00  0.00 
5020+260.00  0.00  10.00  0.00 
5020+280.00  0.00  10.00  0.00 
5020+300.00  0.00  10.00  0.00 
5020+320.00  0.00  10.00  0.00 
5020+340.00  0.00  10.00  0.00 
5020+360.00  0.00  10.00  0.00 
5020+380.00  1.80  10.00  17.95 
5020+400.00  0.47  10.00  22.68 
5020+420.00  3.28  10.00  37.49 
5020+440.00  8.98  10.00  122.51 
5020+460.00  19.83  10.00  288.01 
5020+480.00  20.61  10.00  404.34 
5020+500.00  19.77  10.00  403.80 
5020+520.00  13.92  10.00  336.90 
5020+540.00  9.15  10.00  230.65 
5020+560.00  3.13  10.00  122.72 
5020+580.00  2.29  10.00  54.17 
5020+600.00  4.79  10.00  70.80 
5020+620.00  2.03  10.00  68.18 
5020+640.00  1.45  10.00  34.82 
5020+660.00  2.91  10.00  43.59 
5020+680.00  2.57  10.00  54.76 
5020+700.00  2.76  10.00  53.28 
5020+720.00  0.75  10.00  35.08 
5020+740.00  0.82  10.00  15.68 
5020+760.00  0.00  10.00  8.19 
5020+780.00  0.00  10.00  0.00 
5020+800.00  0.00  10.00  0.00 
5020+820.00  0.00  10.00  0.00 
5020+840.00  0.00  10.00  0.00 
5020+860.00  0.00  10.00  0.00 
5020+880.00  0.00  10.00  0.00 
5020+900.00  0.00  10.00  0.00 
5020+920.00  0.41  10.00  4.12 
5020+940.00  3.93  10.00  43.46 
5020+960.00  6.35  10.00  102.81 
5020+980.00  12.97  10.00  193.14 
5021+000.00  14.14  10.00  271.06 

96 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5021+020.00  13.23  10.00  273.64 


5021+040.00  17.65  10.00  308.78 
5021+060.00  10.62  10.00  282.76 
5021+080.00  0.00  10.00  106.23 
5021+100.00  0.00  10.00  0.00 
5021+120.00  0.00  10.00  0.00 
5021+140.00  0.00  10.00  0.00 
5021+160.00  0.00  10.00  0.00 
5021+180.00  0.00  10.00  0.00 
5021+200.00  0.00  10.00  0.00 
5021+220.00  0.00  10.00  0.00 
5021+240.00  0.00  10.00  0.00 
5021+260.00  0.00  10.00  0.00 
5021+280.00  0.00  10.00  0.00 
5021+300.00  0.00  10.00  0.00 
5021+320.00  0.00  10.00  0.00 
5021+340.00  0.00  10.00  0.00 
5021+360.00  0.00  10.00  0.00 
5021+380.00  0.00  10.00  0.00 
5021+400.00  0.00  10.00  0.00 
5021+420.00  0.00  10.00  0.00 
5021+440.00  0.00  10.00  0.00 
5021+460.00  0.00  10.00  0.00 
5021+480.00  0.00  10.00  0.00 
5021+500.00  0.00  10.00  0.00 
5021+520.00  6.73  10.00  67.31 
5021+540.00  10.60  10.00  173.29 
5021+560.00  29.88  10.00  404.80 
5021+560.00  33.90  0.00  0.00 
5021+580.00  11.61  10.00  455.15 
5021+600.00  36.62  10.00  482.35 
5021+620.00  28.51  10.00  651.35 
5021+640.00  0.00  10.00  285.11 
5021+660.00  0.00  10.00  0.00 
5021+680.00  0.00  10.00  0.00 
5021+700.00  0.00  10.00  0.00 
5021+720.00  0.00  10.00  0.00 
5021+740.00  0.00  10.00  0.00 
5021+760.00  0.00  10.00  0.00 
5021+780.00  0.00  10.00  0.00 
5021+800.00  0.00  10.00  0.00 
5021+820.00  0.00  10.00  0.00 
5021+840.00  0.00  10.00  0.00 
5021+860.00  0.00  10.00  0.00 
5021+880.00  0.00  10.00  0.00 
5021+900.00  0.00  10.00  0.00 
5021+920.00  0.00  10.00  0.00 
5021+920.00  0.00  0.00  0.00 
5021+940.00  0.00  10.00  0.00 
5021+960.00  0.00  10.00  0.00 
5021+980.00  0.00  10.00  0.00 

97 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5022+000.00  0.00  10.00  0.00 


5022+020.00  0.00  10.00  0.00 
5022+040.00  0.00  10.00  0.00 
5022+060.00  0.00  10.00  0.00 
5022+080.00  0.00  10.00  0.00 
5022+100.00  0.00  10.00  0.00 
5022+120.00  0.00  10.00  0.00 
5022+140.00  0.00  10.00  0.00 
5022+160.00  0.00  10.00  0.00 
5022+180.00  0.00  10.00  0.00 
5022+200.00  0.00  10.00  0.00 
5022+220.00  0.00  10.00  0.00 
5022+240.00  0.00  10.00  0.00 
5022+260.00  0.00  10.00  0.00 
5022+280.00  0.00  10.00  0.00 
5022+280.00  0.00  0.00  0.00 
5022+300.00  0.00  10.00  0.00 
5022+320.00  0.00  10.00  0.00 
5022+340.00  0.00  10.00  0.00 
5022+360.00  0.00  10.00  0.00 
5022+380.00  0.00  10.00  0.00 
5022+400.00  0.00  10.00  0.00 
5022+420.00  0.00  10.00  0.00 
5022+440.00  0.00  10.00  0.00 
5022+460.00  0.01  10.00  0.10 
5022+480.00  0.26  10.00  2.72 
5022+490.00  0.31  5.00  2.84 
5022+490.00  0.07  0.00  0.00 
5022+500.00  0.09  5.00  0.82 
5022+520.00  0.03  10.00  1.23 
5022+540.00  0.21  10.00  2.40 
5022+560.00  0.23  10.00  4.34 
5022+580.00  0.00  10.00  2.26 
5022+600.00  0.00  10.00  0.00 
5022+620.00  0.00  10.00  0.00 
5022+640.00  0.00  10.00  0.00 
5022+660.00  0.00  10.00  0.00 
5022+680.00  0.00  10.00  0.00 
5022+685.75  0.00  2.87  0.00 
5022+700.00  0.00  7.13  0.00 
5022+715.75  0.00  7.87  0.00 
5022+720.00  0.00  2.13  0.00 
5022+740.00  0.00  10.00  0.00 
5022+760.00  0.00  10.00  0.00 
5022+780.00  0.00  10.00  0.00 
5022+800.00  0.00  10.00  0.00 
5022+800.10  0.00  0.05  0.00 
5022+820.00  0.00  9.95  0.00 
5022+830.10  0.00  5.05  0.00 
5022+840.00  0.00  4.95  0.00 
5022+860.00  0.00  10.00  0.00 

98 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5022+880.00  0.00  10.00  0.00 


5022+900.00  0.00  10.00  0.00 
5022+920.00  0.00  10.00  0.00 
5022+940.00  0.00  10.00  0.00 
5022+960.00  0.00  10.00  0.00 
5022+980.00  0.00  10.00  0.00 
5023+000.00  0.00  10.00  0.00 
5023+020.00  0.00  10.00  0.00 
5023+040.00  0.00  10.00  0.00 
5023+060.00  0.00  10.00  0.00 
5023+080.00  0.00  10.00  0.00 
5023+100.00  0.00  10.00  0.00 
5023+100.00  0.00  0.00  0.00 
5023+120.00  0.00  10.00  0.00 
5023+140.00  0.00  10.00  0.00 
5023+160.00  0.00  10.00  0.00 
5023+180.00  0.00  10.00  0.00 
5023+200.00  0.00  10.00  0.00 
5023+220.00  0.00  10.00  0.00 
5023+220.00  0.00  0.00  0.00 
5023+240.00  0.00  10.00  0.00 
5023+260.00  0.00  10.00  0.00 
5023+280.00  0.00  10.00  0.00 
5023+300.00  0.00  10.00  0.00 
5023+320.00  0.00  10.00  0.00 
5023+340.00  0.00  10.00  0.00 
5023+360.00  0.00  10.00  0.00 
5023+380.00  0.00  10.00  0.00 
5023+400.00  0.00  10.00  0.00 
5023+420.00  0.00  10.00  0.00 
5023+440.00  0.00  10.00  0.00 
5023+460.00  0.00  10.00  0.00 
5023+480.00  0.00  10.00  0.00 
5023+500.00  0.00  10.00  0.00 
5023+520.00  0.00  10.00  0.00 
5023+540.00  0.00  10.00  0.00 
5023+560.00  0.75  10.00  7.52 
5023+580.00  0.00  10.00  7.52 
5023+600.00  0.00  10.00  0.00 
5023+620.00  0.00  10.00  0.00 
5023+640.00  0.00  10.00  0.00 
5023+660.00  0.00  10.00  0.00 
5023+680.00  0.00  10.00  0.00 
5023+700.00  0.00  10.00  0.00 
5023+720.00  0.00  10.00  0.00 
5023+740.00  0.00  10.00  0.00 
5023+760.00  0.00  10.00  0.00 
5023+770.00  0.00  5.00  0.00 
5023+770.00  0.00  0.00  0.00 
5023+780.00  0.00  5.00  0.00 
5023+800.00  0.00  10.00  0.00 

99 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5023+820.00  0.00  10.00  0.00 


5023+840.00  0.00  10.00  0.00 
5023+860.00  0.00  10.00  0.00 
5023+880.00  0.00  10.00  0.00 
5023+900.00  0.00  10.00  0.00 
5023+900.00  0.00  0.00  0.00 
5023+920.00  0.00  10.00  0.00 
5023+940.00  0.16  10.00  1.63 
5023+960.00  1.25  10.00  14.16 
5023+980.00  0.17  10.00  14.21 
5024+000.00  1.10  10.00  12.71 
5024+007.22  1.16  3.61  8.17 
5024+020.00  1.22  6.39  15.17 
5024+040.00  0.50  10.00  17.15 
5024+060.00  0.02  10.00  5.16 
5024+080.00  0.00  10.00  0.16 
5024+100.00  0.00  10.00  0.00 
5024+120.00  0.57  10.00  5.69 
5024+137.22  0.94  8.61  12.96 
5024+140.00  1.02  1.39  2.71 
5024+160.00  0.50  10.00  15.13 
5024+180.00  0.00  10.00  4.98 
5024+200.00  0.56  10.00  5.61 
5024+220.00  0.00  10.00  5.61 
5024+240.00  0.00  10.00  0.00 
5024+250.00  0.00  5.00  0.00 
5024+260.00  0.00  5.00  0.00 
5024+280.00  0.00  10.00  0.00 
5024+300.00  0.00  10.00  0.00 
5024+320.00  0.00  10.00  0.00 
5024+340.00  0.00  10.00  0.00 
5024+360.00  0.00  10.00  0.00 
5024+380.00  0.00  10.00  0.00 
5024+400.00  0.00  10.00  0.00 
5024+420.00  0.00  10.00  0.00 
5024+440.00  0.00  10.00  0.00 
5024+460.00  0.00  10.00  0.00 
5024+480.00  0.00  10.00  0.00 
5024+500.00  0.00  10.00  0.00 
5024+515.53  0.00  7.76  0.00 
5024+520.00  0.00  2.24  0.00 
5024+535.53  0.00  7.76  0.00 
5024+540.00  0.00  2.24  0.00 
5024+560.00  0.00  10.00  0.00 
5024+580.00  0.00  10.00  0.00 
5024+588.65  0.00  4.32  0.00 
5024+600.00  0.00  5.68  0.00 
5024+620.00  0.00  10.00  0.00 
5024+640.00  0.72  10.00  7.22 
5024+640.00  0.80  0.00  0.00 
5024+660.00  2.19  10.00  29.93 

100 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5024+680.00  2.22  10.00  44.04 


5024+700.00  0.00  10.00  22.15 
5024+718.65  0.00  9.32  0.00 
5024+720.00  0.00  0.68  0.00 
5024+740.00  0.00  10.00  0.00 
5024+760.00  0.00  10.00  0.00 
5024+780.00  0.00  10.00  0.00 
5024+800.00  0.00  10.00  0.00 
5024+815.00  0.00  7.50  0.00 
5024+820.00  0.00  2.50  0.00 
5024+825.00  0.00  2.50  0.00 
5024+835.00  0.00  5.00  0.00 
5024+840.00  0.00  2.50  0.00 
5024+845.00  0.00  2.50  0.00 
5024+855.00  0.00  5.00  0.00 
5024+860.00  0.00  2.50  0.00 
5024+865.00  0.00  2.50  0.00 
5024+875.00  0.00  5.00  0.00 
5024+880.00  0.00  2.50  0.00 
5024+885.00  0.00  2.50  0.00 
5024+895.00  0.00  5.00  0.00 
5024+900.00  0.00  2.50  0.00 
5024+905.00  0.00  2.50  0.00 
5024+915.00  0.00  5.00  0.00 
5024+920.00  0.00  2.50  0.00 
5024+925.00  0.00  2.50  0.00 
5024+935.00  0.00  5.00  0.00 
5024+940.00  0.00  2.50  0.00 
5024+945.00  0.00  2.50  0.00 
5024+955.00  0.00  5.00  0.00 
5024+960.00  0.00  2.50  0.00 
5024+980.00  0.00  10.00  0.00 
5025+000.00  0.00  10.00  0.00 
5025+000.00  0.00  0.00  0.00 
5025+020.00  1.56  10.00  15.56 
5025+040.00  3.68  10.00  52.37 
5025+060.00  3.33  10.00  70.10 
5025+080.00  2.66  10.00  59.93 
5025+100.00  0.64  10.00  33.08 
5025+120.00  0.96  10.00  15.99 
5025+140.00  1.20  10.00  21.58 
5025+160.00  0.62  10.00  18.26 
5025+180.00  2.46  10.00  30.81 
5025+200.00  2.88  10.00  53.33 
5025+220.00  1.59  10.00  44.68 
5025+240.00  2.11  10.00  37.01 
5025+260.00  3.22  10.00  53.31 
5025+270.00  3.06  5.00  31.43 
5025+280.00  3.00  5.00  30.33 
5025+290.00  2.52  5.00  27.62 
5025+300.00  2.89  5.00  27.04 

101 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5025+310.00  3.11  5.00  29.98 


5025+320.00  3.41  5.00  32.62 
5025+330.00  4.01  5.00  37.12 
5025+340.00  4.37  5.00  41.89 
5025+350.00  1.99  5.00  31.79 
5025+360.00  0.14  5.00  10.65 
5025+370.00  0.23  5.00  1.86 
5025+380.00  0.33  5.00  2.81 
5025+390.00  0.24  5.00  2.86 
5025+400.00  0.16  5.00  2.02 
5025+420.00  0.00  10.00  1.60 
5025+440.00  0.00  10.00  0.00 
5025+460.00  0.00  10.00  0.00 
5025+480.00  0.00  10.00  0.00 
5025+500.00  0.00  10.00  0.00 
5025+520.00  0.00  10.00  0.00 
5025+521.36  0.00  0.68  0.00 
5025+540.00  0.27  9.32  2.49 
5025+541.36  0.42  0.68  0.47 
5025+550.36  0.39  4.50  3.64 
5025+560.00  0.34  4.82  3.51 
5025+580.00  0.00  10.00  3.40 
5025+600.00  0.00  10.00  0.00 
5025+620.00  0.00  10.00  0.00 
5025+640.00  0.00  10.00  0.00 
5025+640.36  0.00  0.18  0.00 
5025+660.00  0.00  9.82  0.00 
5025+680.00  0.00  10.00  0.00 
5025+700.00  0.00  10.00  0.00 
5025+720.00  0.00  10.00  0.00 
5025+733.68  0.00  6.84  0.00 
5025+740.00  0.00  3.16  0.00 
5025+760.00  0.00  10.00  0.00 
5025+780.00  0.00  10.00  0.00 
5025+800.00  0.00  10.00  0.00 
5025+820.00  0.00  10.00  0.00 
5025+823.68  0.00  1.84  0.00 
5025+840.00  0.00  8.16  0.00 
5025+860.00  0.00  10.00  0.00 
5025+880.00  0.00  10.00  0.00 
5025+882.88  0.00  1.44  0.00 
5025+900.00  0.00  8.56  0.00 
5025+920.00  0.00  10.00  0.00 
5025+940.00  0.00  10.00  0.00 
5025+960.00  0.79  10.00  7.88 
5025+980.00  2.89  10.00  36.77 
5026+000.00  3.36  10.00  62.47 
5026+020.00  0.00  10.00  33.58 
5026+040.00  0.00  10.00  0.00 
5026+060.00  0.00  10.00  0.00 
5026+080.00  0.00  10.00  0.00 

102 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5026+100.00  0.00  10.00  0.00 


5026+100.00  0.00  0.00  0.00 
5026+120.00  0.00  10.00  0.00 
5026+140.00  0.00  10.00  0.00 
5026+160.00  0.00  10.00  0.00 
5026+180.00  0.00  10.00  0.00 
5026+200.00  1.09  10.00  10.93 
5026+220.00  1.53  10.00  26.21 
5026+240.00  0.00  10.00  15.28 
5026+260.00  0.00  10.00  0.00 
5026+280.00  0.00  10.00  0.00 
5026+300.00  0.00  10.00  0.00 
5026+320.00  0.00  10.00  0.00 
5026+340.00  0.00  10.00  0.00 
5026+360.00  0.00  10.00  0.00 
5026+380.00  0.00  10.00  0.00 
5026+400.00  0.00  10.00  0.00 
5026+420.00  0.00  10.00  0.00 
5026+440.00  0.44  10.00  4.43 
5026+460.00  1.84  10.00  22.82 
5026+480.00  3.61  10.00  54.47 
5026+500.00  0.00  10.00  36.08 
5026+520.00  0.00  10.00  0.00 
5026+540.00  0.00  10.00  0.00 
5026+560.00  0.00  10.00  0.00 
5026+580.00  0.00  10.00  0.00 
5026+600.00  0.00  10.00  0.00 
5026+620.00  0.00  10.00  0.00 
5026+623.09  0.00  1.54  0.00 
5026+640.00  0.00  8.46  0.00 
5026+660.00  0.00  10.00  0.00 
5026+680.00  0.00  10.00  0.00 
5026+683.09  0.00  1.54  0.00 
5026+700.00  0.00  8.46  0.00 
5026+720.00  0.00  10.00  0.00 
5026+740.00  0.00  10.00  0.00 
5026+760.00  0.00  10.00  0.00 
5026+771.35  0.00  5.68  0.00 
5026+780.00  0.00  4.32  0.00 
5026+800.00  0.00  10.00  0.00 
5026+820.00  0.00  10.00  0.00 
5026+831.35  0.00  5.68  0.00 
5026+840.00  0.00  4.32  0.00 
5026+860.00  0.00  10.00  0.00 
5026+880.00  0.00  10.00  0.00 
5026+900.00  0.00  10.00  0.00 
5026+920.00  0.00  10.00  0.00 
5026+940.00  0.00  10.00  0.00 
5026+960.00  0.00  10.00  0.00 
5026+980.00  0.00  10.00  0.00 
5027+000.00  0.00  10.00  0.00 

103 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5027+020.00  0.00  10.00  0.00 


5027+020.00  0.00  0.00  0.00 
5027+040.00  0.00  10.00  0.00 
5027+060.00  0.00  10.00  0.00 
5027+080.00  0.00  10.00  0.00 
5027+100.00  0.00  10.00  0.00 
5027+120.00  0.00  10.00  0.00 
5027+140.00  0.00  10.00  0.00 
5027+160.00  0.00  10.00  0.00 
5027+180.00  0.00  10.00  0.00 
5027+200.00  0.00  10.00  0.00 
5027+220.00  0.00  10.00  0.00 
5027+240.00  0.00  10.00  0.00 
5027+260.00  0.00  10.00  0.00 
5027+280.00  0.00  10.00  0.00 
5027+300.00  0.00  10.00  0.00 
5027+320.00  0.00  10.00  0.00 
5027+340.00  0.00  10.00  0.00 
5027+360.00  0.00  10.00  0.00 
5027+380.00  0.00  10.00  0.00 
5027+400.00  0.00  10.00  0.00 
5027+420.00  0.00  10.00  0.00 
5027+440.00  0.00  10.00  0.00 
5027+460.00  0.00  10.00  0.00 
5027+480.00  0.00  10.00  0.00 
5027+500.00  0.00  10.00  0.00 
5027+520.00  0.00  10.00  0.00 
5027+540.00  0.00  10.00  0.00 
5027+560.00  0.00  10.00  0.00 
5027+580.00  0.00  10.00  0.00 
5027+600.00  0.00  10.00  0.00 
5027+620.00  0.00  10.00  0.00 
5027+640.00  0.00  10.00  0.00 
5027+660.00  0.00  10.00  0.00 
5027+680.00  0.00  10.00  0.00 
5027+700.00  0.00  10.00  0.00 
5027+720.00  0.00  10.00  0.00 
5027+740.00  0.00  10.00  0.00 
5027+750.00  0.00  5.00  0.00 
5027+750.00  0.00  0.00  0.00 
5027+760.00  0.00  5.00  0.00 
5027+780.00  0.59  10.00  5.91 
5027+800.00  0.96  10.00  15.46 
5027+820.00  2.63  10.00  35.83 
5027+840.00  2.95  10.00  55.77 
5027+860.00  0.37  10.00  33.16 
5027+880.00  0.30  10.00  6.64 
5027+900.00  0.20  10.00  4.98 
5027+920.00  3.89  10.00  40.92 
5027+940.00  1.05  10.00  49.36 
5027+960.00  0.00  10.00  10.45 

104 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5027+980.00  0.00  10.00  0.00 


5028+000.00  0.00  10.00  0.00 
5028+020.00  0.00  10.00  0.00 
5028+040.00  0.00  10.00  0.00 
5028+060.00  0.00  10.00  0.00 
5028+080.00  0.00  10.00  0.00 
5028+100.00  0.00  10.00  0.00 
5028+120.00  0.00  10.00  0.00 
5028+140.00  0.00  10.00  0.00 
5028+160.00  0.00  10.00  0.00 
5028+180.00  0.00  10.00  0.00 
5028+200.00  0.00  10.00  0.00 
5028+220.00  0.00  10.00  0.00 
5028+240.00  0.00  10.00  0.00 
5028+260.00  0.00  10.00  0.00 
5028+280.00  0.00  10.00  0.00 
5028+300.00  0.00  10.00  0.00 
5028+320.00  0.00  10.00  0.00 
5028+340.00  0.00  10.00  0.00 
5028+360.00  0.00  10.00  0.00 
5028+380.00  0.00  10.00  0.00 
5028+400.00  0.00  10.00  0.00 
5028+420.00  0.00  10.00  0.00 
5028+440.00  0.00  10.00  0.00 
5028+460.00  0.00  10.00  0.00 
5028+480.00  0.00  10.00  0.00 
5028+490.00  0.00  5.00  0.00 
5028+490.00  0.00  0.00  0.00 
5028+500.00  0.00  5.00  0.00 
5028+520.00  0.00  10.00  0.00 
5028+540.00  0.00  10.00  0.00 
5028+560.00  0.00  10.00  0.00 
5028+580.00  0.00  10.00  0.00 
5028+600.00  0.00  10.00  0.00 
5028+620.00  0.00  10.00  0.00 
5028+640.00  0.00  10.00  0.00 
5028+660.00  0.00  10.00  0.00 
5028+680.00  0.00  10.00  0.00 
5028+700.00  0.00  10.00  0.00 
5028+720.00  0.00  10.00  0.00 
5028+740.00  0.00  10.00  0.00 
5028+760.00  0.00  10.00  0.00 
5028+780.00  0.00  10.00  0.00 
5028+800.00  0.00  10.00  0.00 
5028+820.00  0.00  10.00  0.00 
5028+840.00  0.00  10.00  0.00 
5028+860.00  0.00  10.00  0.00 
5028+880.00  0.00  10.00  0.00 
5028+900.00  0.00  10.00  0.00 
5028+920.00  0.00  10.00  0.00 
5028+920.00  0.00  0.00  0.00 

105 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5028+940.00  0.00  10.00  0.00 


5028+960.00  0.00  10.00  0.00 
5028+980.00  0.00  10.00  0.00 
5029+000.00  0.00  10.00  0.00 
5029+020.00  0.00  10.00  0.00 
5029+040.00  0.00  10.00  0.00 
5029+060.00  0.00  10.00  0.00 
5029+080.00  0.00  10.00  0.00 
5029+100.00  0.00  10.00  0.00 
5029+120.00  0.00  10.00  0.00 
5029+140.00  0.00  10.00  0.00 
5029+160.00  0.00  10.00  0.00 
5029+180.00  0.38  10.00  3.77 
5029+200.00  0.00  10.00  3.77 
5029+220.00  0.00  10.00  0.00 
5029+240.00  0.00  10.00  0.00 
5029+260.00  0.46  10.00  4.56 
5029+280.00  0.00  10.00  4.56 
5029+285.11  0.00  2.56  0.00 
5029+300.00  0.00  7.44  0.00 
5029+320.00  0.00  10.00  0.00 
5029+340.00  0.00  10.00  0.00 
5029+360.00  0.00  10.00  0.00 
5029+380.00  0.00  10.00  0.00 
5029+400.00  0.00  10.00  0.00 
5029+420.00  0.00  10.00  0.00 
5029+435.11  0.00  7.56  0.00 
5029+440.00  0.00  2.44  0.00 
5029+440.00  0.00  0.00  0.00 
5029+460.00  0.00  10.00  0.00 
5029+480.00  0.02  10.00  0.19 
5029+500.00  0.25  10.00  2.67 
5029+520.00  0.39  10.00  6.40 
5029+540.00  0.50  10.00  8.90 
5029+560.00  0.49  10.00  9.92 
5029+580.00  0.54  10.00  10.35 
5029+600.00  0.64  10.00  11.76 
5029+620.00  0.66  10.00  12.93 
5029+640.00  0.49  10.00  11.50 
5029+660.00  0.44  10.00  9.34 
5029+680.00  0.23  10.00  6.70 
5029+700.00  0.00  10.00  2.28 
5029+720.00  0.29  10.00  2.88 
5029+740.00  1.63  10.00  19.16 
5029+740.00  1.63  0.00  0.00 
5029+740.36  1.64  0.18  0.59 
5029+760.00  2.77  9.82  43.32 
5029+780.00  0.00  10.00  27.70 
5029+800.00  0.00  10.00  0.00 
5029+820.00  0.00  10.00  0.00 
5029+840.00  0.00  10.00  0.00 

106 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5029+860.00  0.00  10.00  0.00 


5029+880.00  0.00  10.00  0.00 
5029+890.36  0.00  5.18  0.00 
5029+900.00  0.00  4.82  0.00 
5029+920.00  0.00  10.00  0.00 
5029+940.00  0.00  10.00  0.00 
5029+960.00  0.00  10.00  0.00 
5029+980.00  0.00  10.00  0.00 
5030+000.00  0.00  10.00  0.00 
5030+020.00  0.00  10.00  0.00 
5030+040.00  0.00  10.00  0.00 
5030+060.00  0.00  10.00  0.00 
5030+065.00  0.00  2.50  0.00 
5030+065.00  0.00  0.00  0.00 
5030+080.00  0.00  7.50  0.00 
5030+100.00  0.00  10.00  0.00 
5030+120.00  0.00  10.00  0.00 
5030+140.00  0.00  10.00  0.00 
5030+160.00  0.00  10.00  0.00 
5030+180.00  0.00  10.00  0.00 
5030+200.00  0.00  10.00  0.00 
5030+220.00  0.00  10.00  0.00 
5030+240.00  0.00  10.00  0.00 
5030+260.00  0.00  10.00  0.00 
5030+280.00  0.00  10.00  0.00 
5030+300.00  0.00  10.00  0.00 
5030+320.00  0.00  10.00  0.00 
5030+340.00  0.00  10.00  0.00 
5030+360.00  0.00  10.00  0.00 
5030+380.00  0.00  10.00  0.00 
5030+400.00  0.00  10.00  0.00 
5030+420.00  0.00  10.00  0.00 
5030+440.00  0.00  10.00  0.00 
5030+460.00  0.00  10.00  0.00 
5030+480.00  0.00  10.00  0.00 
5030+500.00  0.00  10.00  0.00 
5030+520.00  0.00  10.00  0.00 
5030+540.00  0.00  10.00  0.00 
5030+560.00  0.00  10.00  0.00 
5030+580.00  0.00  10.00  0.00 
5030+600.00  0.00  10.00  0.00 
5030+620.00  0.00  10.00  0.00 
5030+640.00  0.00  10.00  0.00 
5030+660.00  0.00  10.00  0.00 
5030+680.00  0.00  10.00  0.00 
5030+700.00  0.00  10.00  0.00 
5030+713.58  0.00  6.79  0.00 
5030+720.00  0.00  3.21  0.00 
5030+740.00  0.00  10.00  0.00 
5030+743.58  0.00  1.79  0.00 
5030+760.00  0.00  8.21  0.00 

107 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5030+780.00  0.00  10.00  0.00 


5030+800.00  0.00  10.00  0.00 
5030+820.00  0.00  10.00  0.00 
5030+831.05  0.00  5.52  0.00 
5030+840.00  0.00  4.48  0.00 
5030+860.00  0.00  10.00  0.00 
5030+861.05  0.00  0.52  0.00 
5030+880.00  0.00  9.48  0.00 
5030+900.00  0.00  10.00  0.00 
5030+920.00  0.00  10.00  0.00 
5030+940.00  0.00  10.00  0.00 
5030+940.00  0.00  0.00  0.00 
5030+960.00  0.00  10.00  0.00 
5030+980.00  0.00  10.00  0.00 
5031+000.00  0.00  10.00  0.00 
5031+020.00  0.00  10.00  0.00 
5031+040.00  0.00  10.00  0.00 
5031+060.00  0.00  10.00  0.00 
5031+080.00  0.00  10.00  0.00 
5031+100.00  0.00  10.00  0.00 
5031+120.00  0.00  10.00  0.00 
5031+140.00  0.00  10.00  0.00 
5031+160.00  0.00  10.00  0.00 
5031+180.00  0.00  10.00  0.00 
5031+200.00  0.00  10.00  0.00 
5031+220.00  0.00  10.00  0.00 
5031+240.00  0.00  10.00  0.00 
5031+260.00  0.00  10.00  0.00 
5031+280.00  0.00  10.00  0.00 
5031+300.00  0.00  10.00  0.00 
5031+320.00  0.00  10.00  0.00 
5031+340.00  0.00  10.00  0.00 
5031+360.00  0.00  10.00  0.00 
5031+380.00  0.00  10.00  0.00 
5031+400.00  0.00  10.00  0.00 
5031+420.00  0.00  10.00  0.00 
5031+440.00  0.00  10.00  0.00 
5031+460.00  0.00  10.00  0.00 
5031+480.00  0.00  10.00  0.00 
5031+500.00  0.00  10.00  0.00 
5031+520.00  0.00  10.00  0.00 
5031+540.00  0.00  10.00  0.00 
5031+560.00  0.00  10.00  0.00 
5031+580.00  0.00  10.00  0.00 
5031+600.00  0.00  10.00  0.00 
5031+620.00  0.00  10.00  0.00 
5031+640.00  0.00  10.00  0.00 
5031+660.00  0.00  10.00  0.00 
5031+680.00  0.00  10.00  0.00 
5031+700.00  0.00  10.00  0.00 
5031+720.00  0.00  10.00  0.00 

108 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5031+740.00  0.00  10.00  0.00 


5031+760.00  0.00  10.00  0.00 
5031+780.00  0.00  10.00  0.00 
5031+800.00  0.00  10.00  0.00 
5031+820.00  0.00  10.00  0.00 
5031+840.00  0.00  10.00  0.00 
5031+860.00  0.00  10.00  0.00 
5031+880.00  0.00  10.00  0.00 
5031+900.00  0.00  10.00  0.00 
5031+920.00  0.00  10.00  0.00 
5031+940.00  0.00  10.00  0.00 
5031+960.00  0.00  10.00  0.00 
5031+980.00  0.00  10.00  0.00 
5032+000.00  0.00  10.00  0.00 
5032+020.00  0.00  10.00  0.00 
5032+040.00  0.00  10.00  0.00 
5032+060.00  0.00  10.00  0.00 
5032+080.00  0.00  10.00  0.00 
5032+100.00  0.00  10.00  0.00 
5032+120.00  0.00  10.00  0.00 
5032+140.00  0.00  10.00  0.00 
5032+160.00  0.00  10.00  0.00 
5032+180.00  0.00  10.00  0.00 
5032+200.00  0.00  10.00  0.00 
5032+220.00  0.00  10.00  0.00 
5032+240.00  0.30  10.00  3.00 
5032+260.00  0.00  10.00  3.00 
5032+280.00  0.00  10.00  0.00 
5032+300.00  0.00  10.00  0.00 
5032+320.00  0.00  10.00  0.00 
5032+340.00  0.00  10.00  0.00 
5032+360.00  0.00  10.00  0.00 
5032+380.00  0.00  10.00  0.00 
5032+400.00  0.00  10.00  0.00 
5032+420.00  0.00  10.00  0.00 
5032+440.00  0.00  10.00  0.00 
5032+460.00  0.00  10.00  0.00 
5032+480.00  0.00  10.00  0.00 
5032+500.00  0.00  10.00  0.00 
5032+520.00  0.00  10.00  0.00 
5032+540.00  0.00  10.00  0.00 
5032+560.00  0.00  10.00  0.00 
5032+580.00  0.00  10.00  0.00 
5032+600.00  0.00  10.00  0.00 
5032+620.00  0.00  10.00  0.00 
5032+640.00  0.00  10.00  0.00 
5032+660.00  0.00  10.00  0.00 
5032+680.00  0.00  10.00  0.00 
5032+700.00  0.00  10.00  0.00 
5032+720.00  0.00  10.00  0.00 
5032+740.00  0.00  10.00  0.00 

109 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5032+760.00  0.00  10.00  0.00 


5032+780.00  0.00  10.00  0.00 
5032+800.00  0.00  10.00  0.00 
5032+820.00  0.00  10.00  0.00 
5032+840.00  0.00  10.00  0.00 
5032+860.00  0.00  10.00  0.00 
5032+880.00  0.00  10.00  0.00 
5032+900.00  0.00  10.00  0.00 
5032+920.00  0.00  10.00  0.00 
5032+940.00  0.00  10.00  0.00 
5032+960.00  0.00  10.00  0.00 
5032+980.00  0.00  10.00  0.00 
5033+000.00  0.00  10.00  0.00 
5033+020.00  0.00  10.00  0.00 
5033+040.00  0.00  10.00  0.00 
5033+060.00  0.00  10.00  0.00 
5033+080.00  0.00  10.00  0.00 
5033+100.00  0.00  10.00  0.00 
5033+120.00  0.00  10.00  0.00 
5033+140.00  0.00  10.00  0.00 
5033+160.00  0.00  10.00  0.00 
5033+180.00  0.00  10.00  0.00 
5033+200.00  0.00  10.00  0.00 
5033+220.00  0.00  10.00  0.00 
5033+240.00  0.00  10.00  0.00 
5033+260.00  0.00  10.00  0.00 
5033+280.00  0.00  10.00  0.00 
5033+300.00  0.00  10.00  0.00 
5033+320.00  0.00  10.00  0.00 
5033+340.00  0.00  10.00  0.00 
5033+360.00  0.00  10.00  0.00 
5033+380.00  0.00  10.00  0.00 
5033+400.00  0.00  10.00  0.00 
5033+420.00  0.00  10.00  0.00 
5033+440.00  0.00  10.00  0.00 
5033+460.00  0.00  10.00  0.00 
5033+480.00  0.00  10.00  0.00 
5033+500.00  0.00  10.00  0.00 
5033+520.00  0.00  10.00  0.00 
5033+540.00  0.00  10.00  0.00 
5033+560.00  0.00  10.00  0.00 
5033+580.00  0.00  10.00  0.00 
5033+600.00  0.00  10.00  0.00 
5033+620.00  0.00  10.00  0.00 
5033+640.00  0.00  10.00  0.00 
5033+660.00  0.00  10.00  0.00 
5033+680.00  0.00  10.00  0.00 
5033+700.00  0.00  10.00  0.00 
5033+720.00  0.00  10.00  0.00 
5033+740.00  0.00  10.00  0.00 
5033+750.00  0.00  5.00  0.00 

110 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5033+760.00  0.00  5.00  0.00 


5033+763.47  0.00  1.74  0.00 
5033+780.00  0.00  8.26  0.00 
5033+793.47  0.00  6.74  0.00 
5033+800.00  0.00  3.26  0.00 
5033+820.00  0.00  10.00  0.00 
5033+840.00  0.00  10.00  0.00 
5033+860.00  0.00  10.00  0.00 
5033+877.83  0.00  8.92  0.00 
5033+880.00  0.00  1.08  0.00 
5033+900.00  0.00  10.00  0.00 
5033+907.83  0.00  3.92  0.00 
5033+920.00  0.00  6.08  0.00 
5033+940.00  0.00  10.00  0.00 
5033+960.00  0.00  10.00  0.00 
5033+980.00  0.00  10.00  0.00 
5034+000.00  0.00  10.00  0.00 
5034+020.00  0.00  10.00  0.00 
5034+040.00  0.00  10.00  0.00 
5034+060.00  0.00  10.00  0.00 
5034+080.00  0.00  10.00  0.00 
5034+100.00  0.00  10.00  0.00 
5034+120.00  0.00  10.00  0.00 
5034+140.00  0.00  10.00  0.00 
5034+160.00  0.00  10.00  0.00 
5034+180.00  0.00  10.00  0.00 
5034+200.00  0.00  10.00  0.00 
5034+200.00  0.00  0.00  0.00 
5034+220.00  0.00  10.00  0.00 
5034+240.00  0.00  10.00  0.00 
5034+260.00  0.00  10.00  0.00 
5034+280.00  0.00  10.00  0.00 
5034+290.00  0.00  5.00  0.00 
5034+290.00  0.00  0.00  0.00 
5034+300.00  0.00  5.00  0.00 
5034+320.00  0.00  10.00  0.00 
5034+340.00  0.00  10.00  0.00 
5034+360.00  0.00  10.00  0.00 
5034+380.00  0.00  10.00  0.00 
5034+400.00  0.00  10.00  0.00 
5034+420.00  0.00  10.00  0.00 
5034+440.00  0.00  10.00  0.00 
5034+450.00  0.00  5.00  0.00 
5034+460.00  0.00  5.00  0.00 
5034+480.00  0.00  10.00  0.00 
5034+500.00  0.00  10.00  0.00 
5034+520.00  0.00  10.00  0.00 
5034+540.00  0.00  10.00  0.00 
5034+560.00  0.00  10.00  0.00 
5034+580.00  0.00  10.00  0.00 
5034+600.00  0.00  10.00  0.00 

111 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5034+620.00  0.00  10.00  0.00 


5034+640.00  0.00  10.00  0.00 
5034+660.00  0.00  10.00  0.00 
5034+680.00  0.00  10.00  0.00 
5034+700.00  0.00  10.00  0.00 
5034+720.00  0.00  10.00  0.00 
5034+740.00  0.00  10.00  0.00 
5034+760.00  0.00  10.00  0.00 
5034+780.00  0.00  10.00  0.00 
5034+800.00  0.00  10.00  0.00 
5034+820.00  0.00  10.00  0.00 
5034+840.00  0.00  10.00  0.00 
5034+860.00  0.00  10.00  0.00 
5034+880.00  0.00  10.00  0.00 
5034+900.00  0.00  10.00  0.00 
5034+920.00  0.00  10.00  0.00 
5034+940.00  0.00  10.00  0.00 
5034+960.00  0.00  10.00  0.00 
5034+980.00  0.00  10.00  0.00 
5035+000.00  0.00  10.00  0.00 
5035+020.00  0.00  10.00  0.00 
5035+028.75  1.15  4.38  5.01 
5035+040.00  6.68  5.62  43.99 
5035+058.75  0.00  9.38  62.62 
5035+060.00  0.00  0.62  0.00 
5035+080.00  0.00  10.00  0.00 
5035+100.00  0.00  10.00  0.00 
5035+100.00  0.00  0.00  0.00 
5035+120.00  0.00  10.00  0.00 
5035+140.00  0.00  10.00  0.00 
5035+143.04  0.00  1.52  0.00 
5035+160.00  0.00  8.48  0.00 
5035+173.04  0.00  6.52  0.00 
5035+180.00  0.00  3.48  0.00 
5035+200.00  0.00  10.00  0.00 
5035+220.00  0.00  10.00  0.00 
5035+240.00  0.00  10.00  0.00 
5035+260.00  6.46  10.00  64.57 
5035+280.00  14.08  10.00  205.38 
5035+300.00  5.05  10.00  191.28 
5035+320.00  0.00  10.00  50.47 
5035+340.00  0.00  10.00  0.00 
5035+360.00  0.00  10.00  0.00 
5035+380.00  0.00  10.00  0.00 
5035+400.00  0.00  10.00  0.00 
5035+420.00  0.00  10.00  0.00 
5035+440.00  0.00  10.00  0.00 
5035+460.00  0.00  10.00  0.00 
5035+480.00  0.00  10.00  0.00 
5035+500.00  0.00  10.00  0.00 
5035+520.00  0.00  10.00  0.00 

112 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5035+540.00  0.00  10.00  0.00 


5035+560.00  0.00  10.00  0.00 
5035+580.00  0.00  10.00  0.00 
5035+600.00  0.00  10.00  0.00 
5035+620.00  0.00  10.00  0.00 
5035+640.00  0.00  10.00  0.00 
5035+660.00  0.00  10.00  0.00 
5035+680.00  0.00  10.00  0.00 
5035+700.00  0.00  10.00  0.00 
5035+720.00  0.00  10.00  0.00 
5035+740.00  0.00  10.00  0.00 
5035+760.00  0.00  10.00  0.00 
5035+780.00  1.33  10.00  13.30 
5035+800.00  5.80  10.00  71.26 
5035+820.00  2.91  10.00  87.03 
5035+840.00  1.53  10.00  44.41 
5035+860.00  0.94  10.00  24.78 
5035+880.00  0.00  10.00  9.44 
5035+900.00  0.00  10.00  0.00 
5035+920.00  0.00  10.00  0.00 
5035+940.00  0.00  10.00  0.00 
5035+960.00  0.00  10.00  0.00 
5035+980.00  0.00  10.00  0.00 
5036+000.00  0.00  10.00  0.00 
5036+000.00  0.00  0.00  0.00 
5036+020.00  0.00  10.00  0.00 
5036+040.00  0.00  10.00  0.00 
5036+060.00  1.82  10.00  18.18 
5036+080.00  2.09  10.00  39.05 
5036+100.00  0.99  10.00  30.72 
5036+120.00  0.82  10.00  18.04 
5036+140.00  0.51  10.00  13.24 
5036+160.00  0.00  10.00  5.05 
5036+180.00  0.00  10.00  0.00 
5036+200.00  0.00  10.00  0.00 
5036+220.00  0.00  10.00  0.00 
5036+240.00  0.00  10.00  0.00 
5036+260.00  0.00  10.00  0.00 
5036+280.00  0.00  10.00  0.00 
5036+300.00  0.00  10.00  0.00 
5036+320.00  0.00  10.00  0.00 
5036+340.00  0.00  10.00  0.00 
5036+360.00  0.00  10.00  0.00 
5036+360.00  0.00  0.00  0.00 
5036+380.00  0.00  10.00  0.00 
5036+400.00  0.00  10.00  0.00 
5036+420.00  0.00  10.00  0.00 
5036+440.00  0.00  10.00  0.00 
5036+460.00  0.00  10.00  0.00 
5036+480.00  0.00  10.00  0.00 
5036+500.00  0.00  10.00  0.00 

113 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5036+500.00  0.00  0.00  0.00 


5036+520.00  0.00  10.00  0.00 
5036+540.00  0.00  10.00  0.00 
5036+560.00  0.00  10.00  0.00 
5036+580.00  0.00  10.00  0.00 
5036+600.00  0.00  10.00  0.00 
5036+620.00  0.00  10.00  0.00 
5036+640.00  0.00  10.00  0.00 
5036+660.00  0.00  10.00  0.00 
5036+680.00  0.00  10.00  0.00 
5036+700.00  0.00  10.00  0.00 
5036+720.00  0.00  10.00  0.00 
5036+740.00  0.00  10.00  0.00 
5036+760.00  0.00  10.00  0.00 
5036+780.00  0.00  10.00  0.00 
5036+800.00  0.00  10.00  0.00 
5036+820.00  0.00  10.00  0.00 
5036+840.00  0.00  10.00  0.00 
5036+860.00  0.00  10.00  0.00 
5036+880.00  0.00  10.00  0.00 
5036+900.00  0.00  10.00  0.00 
5036+920.00  0.00  10.00  0.00 
5036+940.00  0.00  10.00  0.00 
5036+960.00  0.00  10.00  0.00 
5036+980.00  0.00  10.00  0.00 
5037+000.00  0.00  10.00  0.00 
5037+020.00  0.00  10.00  0.00 
5037+040.00  0.00  10.00  0.00 
5037+060.00  0.00  10.00  0.00 
5037+080.00  0.00  10.00  0.00 
5037+100.00  0.00  10.00  0.00 
5037+120.00  0.00  10.00  0.00 
5037+140.00  0.00  10.00  0.00 
5037+160.00  0.00  10.00  0.00 
5037+180.00  0.00  10.00  0.00 
5037+200.00  0.00  10.00  0.00 
5037+220.00  0.00  10.00  0.00 
5037+240.00  0.00  10.00  0.00 
5037+260.00  0.00  10.00  0.00 
5037+280.00  0.00  10.00  0.00 
5037+300.00  0.00  10.00  0.00 
5037+320.00  0.00  10.00  0.00 
5037+340.00  0.00  10.00  0.00 
5037+360.00  0.00  10.00  0.00 
5037+380.00  0.00  10.00  0.00 
5037+400.00  0.00  10.00  0.00 
5037+420.00  0.00  10.00  0.00 
5037+440.00  0.00  10.00  0.00 
5037+460.00  0.00  10.00  0.00 
5037+480.00  0.00  10.00  0.00 
5037+500.00  0.00  10.00  0.00 

114 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5037+520.00  0.00  10.00  0.00 


5037+540.00  0.00  10.00  0.00 
5037+560.00  0.00  10.00  0.00 
5037+580.00  0.00  10.00  0.00 
5037+600.00  0.00  10.00  0.00 
5037+620.00  0.00  10.00  0.00 
5037+640.00  0.00  10.00  0.00 
5037+660.00  0.00  10.00  0.00 
5037+680.00  0.00  10.00  0.00 
5037+700.00  0.00  10.00  0.00 
5037+720.00  0.00  10.00  0.00 
5037+740.00  0.00  10.00  0.00 
5037+760.00  0.00  10.00  0.00 
5037+780.00  0.00  10.00  0.00 
5037+800.00  0.00  10.00  0.00 
5037+820.00  0.00  10.00  0.00 
5037+840.00  0.00  10.00  0.00 
5037+860.00  0.00  10.00  0.00 
5037+880.00  0.00  10.00  0.00 
5037+900.00  0.00  10.00  0.00 
5037+920.00  0.00  10.00  0.00 
5037+940.00  0.00  10.00  0.00 
5037+960.00  0.00  10.00  0.00 
5037+980.00  0.00  10.00  0.00 
5038+000.00  0.00  10.00  0.00 
5038+020.00  0.00  10.00  0.00 
5038+040.00  0.00  10.00  0.00 
5038+060.00  0.00  10.00  0.00 
5038+080.00  0.00  10.00  0.00 
5038+100.00  0.00  10.00  0.00 
5038+120.00  0.00  10.00  0.00 
5038+140.00  0.00  10.00  0.00 
5038+160.00  0.00  10.00  0.00 
5038+180.00  0.00  10.00  0.00 
5038+200.00  0.00  10.00  0.00 
5038+220.00  0.00  10.00  0.00 
5038+240.00  0.00  10.00  0.00 
5038+260.00  0.00  10.00  0.00 
5038+280.00  0.00  10.00  0.00 
5038+300.00  0.00  10.00  0.00 
5038+320.00  0.00  10.00  0.00 
5038+340.00  0.00  10.00  0.00 
5038+360.00  0.00  10.00  0.00 
5038+380.00  0.00  10.00  0.00 
5038+400.00  0.00  10.00  0.00 
5038+420.00  0.00  10.00  0.00 
5038+440.00  0.00  10.00  0.00 
5038+460.00  0.00  10.00  0.00 
5038+480.00  0.00  10.00  0.00 
5038+500.00  0.00  10.00  0.00 
5038+520.00  0.00  10.00  0.00 

115 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5038+540.00  0.00  10.00  0.00 


5038+560.00  0.00  10.00  0.00 
5038+580.00  0.00  10.00  0.00 
5038+600.00  0.00  10.00  0.00 
5038+620.00  0.00  10.00  0.00 
5038+640.00  0.00  10.00  0.00 
5038+660.00  0.00  10.00  0.00 
5038+680.00  0.00  10.00  0.00 
5038+700.00  0.00  10.00  0.00 
5038+720.00  0.00  10.00  0.00 
5038+740.00  0.00  10.00  0.00 
5038+760.00  0.00  10.00  0.00 
5038+780.00  0.00  10.00  0.00 
5038+800.00  0.00  10.00  0.00 
5038+820.00  0.00  10.00  0.00 
5038+840.00  0.00  10.00  0.00 
5038+860.00  0.00  10.00  0.00 
5038+880.00  0.00  10.00  0.00 
5038+900.00  0.00  10.00  0.00 
5038+920.00  0.00  10.00  0.00 
5038+940.00  0.00  10.00  0.00 
5038+960.00  0.00  10.00  0.00 
5038+980.00  0.00  10.00  0.00 
5039+000.00  0.00  10.00  0.00 
5039+020.00  0.00  10.00  0.00 
5039+040.00  0.00  10.00  0.00 
5039+060.00  0.00  10.00  0.00 
5039+080.00  0.00  10.00  0.00 
5039+100.00  0.00  10.00  0.00 
5039+120.00  0.00  10.00  0.00 
5039+140.00  0.00  10.00  0.00 
5039+160.00  0.00  10.00  0.00 
5039+180.00  0.00  10.00  0.00 
5039+200.00  0.00  10.00  0.00 
5039+220.00  0.00  10.00  0.00 
5039+240.00  0.00  10.00  0.00 
5039+260.00  0.00  10.00  0.00 
5039+280.00  0.00  10.00  0.00 
5039+300.00  0.00  10.00  0.00 
5039+301.44  0.00  0.72  0.00 
5039+320.00  0.00  9.28  0.00 
5039+340.00  0.00  10.00  0.00 
5039+351.44  0.00  5.72  0.00 
5039+360.00  0.00  4.28  0.00 
5039+380.00  0.38  10.00  3.80 
5039+400.00  1.12  10.00  15.02 
5039+420.00  0.94  10.00  20.59 
5039+440.00  0.00  10.00  9.37 
5039+441.77  0.00  0.88  0.00 
5039+460.00  0.00  9.12  0.00 
5039+480.00  0.00  10.00  0.00 

116 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5039+491.77  0.00  5.88  0.00 


5039+500.00  0.00  4.12  0.00 
5039+520.00  0.00  10.00  0.00 
5039+540.00  0.00  10.00  0.00 
5039+560.00  0.00  10.00  0.00 
5039+580.00  0.00  10.00  0.00 
5039+600.00  0.00  10.00  0.00 
5039+620.00  0.00  10.00  0.00 
5039+640.00  0.00  10.00  0.00 
5039+660.00  0.00  10.00  0.00 
5039+680.00  0.00  10.00  0.00 
5039+700.00  0.00  10.00  0.00 
5039+720.00  0.00  10.00  0.00 
5039+740.00  0.00  10.00  0.00 
5039+760.00  0.00  10.00  0.00 
5039+780.00  0.00  10.00  0.00 
5039+800.00  0.00  10.00  0.00 
5039+820.00  0.00  10.00  0.00 
5039+840.00  0.00  10.00  0.00 
5039+860.00  0.00  10.00  0.00 
5039+880.00  0.00  10.00  0.00 
5039+900.00  0.00  10.00  0.00 
5039+920.00  0.00  10.00  0.00 
5039+940.00  0.00  10.00  0.00 
5039+960.00  0.00  10.00  0.00 
5039+980.00  0.00  10.00  0.00 
5040+000.00  0.00  10.00  0.00 
5040+020.00  0.00  10.00  0.00 
5040+040.00  1.03  10.00  10.34 
5040+060.00  0.81  10.00  18.45 
5040+080.00  0.89  10.00  17.05 
5040+100.00  9.46  10.00  103.57 
5040+120.00  6.73  10.00  161.97 
5040+140.00  0.00  10.00  67.34 
5040+160.00  0.00  10.00  0.00 
5040+180.00  0.00  10.00  0.00 
5040+200.00  0.00  10.00  0.00 
5040+220.00  0.00  10.00  0.00 
5040+240.00  0.00  10.00  0.00 
5040+260.00  0.00  10.00  0.00 
5040+280.00  0.00  10.00  0.00 
5040+300.00  0.00  10.00  0.00 
5040+320.00  0.00  10.00  0.00 
5040+340.00  0.00  10.00  0.00 
5040+360.00  0.00  10.00  0.00 
5040+380.00  0.00  10.00  0.00 
5040+400.00  0.00  10.00  0.00 
5040+420.00  0.00  10.00  0.00 
5040+440.00  0.00  10.00  0.00 
5040+460.00  0.00  10.00  0.00 
5040+480.00  0.00  10.00  0.00 

117 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5040+500.00  0.00  10.00  0.00 


5040+520.00  0.00  10.00  0.00 
5040+540.00  0.00  10.00  0.00 
5040+540.00  0.00  0.00  0.00 
5040+540.00  0.00  0.00  0.00 
5040+560.00  0.00  10.00  0.00 
5040+571.00  0.00  5.50  0.00 
5040+571.00  0.00  0.00  0.00 
5040+571.00  0.00  0.00  0.00 
5040+580.00  0.00  4.50  0.00 
5040+600.00  0.00  10.00  0.00 
5040+620.00  0.00  10.00  0.00 
5040+640.00  0.00  10.00  0.00 
5040+660.00  0.00  10.00  0.00 
5040+680.00  0.00  10.00  0.00 
5040+700.00  0.00  10.00  0.00 
5040+720.00  0.00  10.00  0.00 
5040+740.00  0.00  10.00  0.00 
5040+760.00  0.00  10.00  0.00 
5040+780.00  0.00  10.00  0.00 
5040+800.00  0.00  10.00  0.00 
5040+820.00  0.00  10.00  0.00 
5040+840.00  0.00  10.00  0.00 
5040+860.00  0.00  10.00  0.00 
5040+880.00  0.00  10.00  0.00 
5040+900.00  0.00  10.00  0.00 
5040+920.00  0.00  10.00  0.00 
5040+940.00  0.00  10.00  0.00 
5040+960.00  0.00  10.00  0.00 
5040+980.00  0.00  10.00  0.00 
5041+000.00  0.00  10.00  0.00 
5041+020.00  0.00  10.00  0.00 
5041+040.00  0.00  10.00  0.00 
5041+060.00  0.00  10.00  0.00 
5041+080.00  0.00  10.00  0.00 
5041+100.00  0.00  10.00  0.00 
5041+120.00  0.00  10.00  0.00 
5041+140.00  0.00  10.00  0.00 
5041+160.00  0.00  10.00  0.00 
5041+180.00  0.00  10.00  0.00 
5041+200.00  0.00  10.00  0.00 
5041+200.00  0.00  0.00  0.00 
5041+220.00  0.00  10.00  0.00 
5041+235.00  0.00  7.50  0.00 
5041+235.00  0.00  0.00  0.00 
5041+235.00  0.00  0.00  0.00 
5041+240.00  0.00  2.50  0.00 
5041+250.00  0.00  5.00  0.00 
5041+250.00  0.00  0.00  0.00 
5041+260.00  0.00  5.00  0.00 
5041+268.00  0.00  4.00  0.00 

118 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5041+268.00  0.00  0.00  0.00 


5041+268.00  0.00  0.00  0.00 
5041+280.00  0.00  6.00  0.00 
5041+300.00  0.00  10.00  0.00 
5041+320.00  0.00  10.00  0.00 
5041+340.00  0.00  10.00  0.00 
5041+360.00  0.00  10.00  0.00 
5041+370.00  0.00  5.00  0.00 
5041+370.00  0.00  0.00  0.00 
5041+370.00  0.00  0.00  0.00 
5041+380.00  0.00  5.00  0.00 
5041+400.00  0.00  10.00  0.00 
5041+402.00  0.00  1.00  0.00 
5041+402.00  0.00  0.00  0.00 
5041+402.00  0.00  0.00  0.00 
5041+402.00  0.00  0.00  0.00 
5041+420.00  0.00  9.00  0.00 
5041+440.00  0.00  10.00  0.00 
5041+460.00  0.00  10.00  0.00 
5041+480.00  0.00  10.00  0.00 
5041+500.00  0.00  10.00  0.00 
5041+520.00  0.00  10.00  0.00 
5041+540.00  0.00  10.00  0.00 
5041+560.00  0.00  10.00  0.00 
5041+580.00  0.00  10.00  0.00 
5041+600.00  0.00  10.00  0.00 
5041+620.00  0.00  10.00  0.00 
5041+640.00  0.00  10.00  0.00 
5041+660.00  0.00  10.00  0.00 
5041+680.00  0.00  10.00  0.00 
5041+700.00  0.00  10.00  0.00 
5041+720.00  0.00  10.00  0.00 
5041+740.00  0.00  10.00  0.00 
5041+760.00  0.00  10.00  0.00 
5041+780.00  0.00  10.00  0.00 
5041+800.00  0.00  10.00  0.00 
5041+820.00  0.00  10.00  0.00 
5041+840.00  0.00  10.00  0.00 
5041+860.00  0.00  10.00  0.00 
5041+880.00  0.00  10.00  0.01 
5041+900.00  0.00  10.00  0.02 
5041+920.00  0.00  10.00  0.03 
5041+940.00  0.00  10.00  0.05 
5041+960.00  0.01  10.00  0.10 
5041+980.00  0.04  10.00  0.45 
5042+000.00  0.03  10.00  0.64 
5042+002.37  0.02  1.18  0.06 
5042+020.00  0.01  8.82  0.30 
5042+032.37  0.01  6.18  0.14 
5042+040.00  0.02  3.82  0.11 
5042+060.00  0.03  10.00  0.47 

119 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5042+080.00  0.03  10.00  0.61 


5042+100.00  0.01  10.00  0.41 
5042+120.00  0.01  10.00  0.24 
5042+120.89  0.01  0.44  0.01 
5042+140.00  0.03  9.56  0.44 
5042+150.89  0.00  5.44  0.20 
5042+160.00  0.00  4.56  0.01 
5042+180.00  0.00  10.00  0.00 
5042+200.00  0.69  10.00  6.91 
5042+220.00  0.00  10.00  6.91 
5042+240.00  0.00  10.00  0.02 
5042+260.00  0.00  10.00  0.02 
5042+280.00  0.00  10.00  0.00 
5042+300.00  0.00  10.00  0.00 
5042+320.00  0.00  10.00  0.00 
5042+340.00  0.64  10.00  6.41 
5042+360.00  0.00  10.00  6.41 
5042+380.00  0.00  10.00  0.00 
5042+400.00  0.68  10.00  6.75 
5042+420.00  0.00  10.00  6.75 
5042+440.00  0.00  10.00  0.00 
5042+460.00  0.00  10.00  0.00 
5042+460.03  0.00  0.01  0.00 
5042+470.00  0.00  4.99  0.00 
5042+480.00  0.57  5.00  2.87 
5042+480.03  0.58  0.01  0.02 
5042+490.00  0.74  4.99  6.55 
5042+500.00  0.88  5.00  8.10 
5042+510.00  0.00  5.00  4.41 
5042+520.00  0.00  5.00  0.00 
5042+530.00  0.00  5.00  0.00 
5042+540.00  0.00  5.00  0.00 
5042+550.00  0.00  5.00  0.00 
5042+560.00  0.04  5.00  0.18 
5042+570.00  0.00  5.00  0.18 
5042+580.00  0.00  5.00  0.00 
5042+590.00  0.00  5.00  0.00 
5042+600.00  0.00  5.00  0.02 
5042+600.00  0.00  0.00  0.00 
5042+610.00  0.00  5.00  0.00 
5042+620.00  0.00  5.00  0.00 
5042+630.00  0.86  5.00  4.31 
5042+640.00  0.94  5.00  8.99 
5042+650.00  0.36  5.00  6.49 
5042+660.00  0.34  5.00  3.49 
5042+680.00  0.19  10.00  5.29 
5042+700.00  0.35  10.00  5.42 
5042+720.00  0.00  10.00  3.48 
5042+740.00  0.00  10.00  0.00 
5042+760.00  0.64  10.00  6.43 
5042+780.00  0.00  10.00  6.43 

120 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5042+800.00  0.01  10.00  0.06 


5042+800.00  0.01  0.00  0.00 
5042+820.00  0.01  10.00  0.14 
5042+840.00  0.00  10.00  0.08 
5042+860.00  0.00  10.00  0.00 
5042+862.97  0.00  1.48  0.00 
5042+880.00  0.00  8.52  0.02 
5042+900.00  0.00  10.00  0.02 
5042+920.00  0.00  10.00  0.00 
5042+940.00  0.00  10.00  0.00 
5042+960.00  0.00  10.00  0.00 
5042+980.00  0.00  10.00  0.00 
5043+000.00  0.00  10.00  0.00 

 
TABLA 18 VOLUMEN DE CORTE PARA EL TRAMO DEL 5071+500 – 6006+000 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
5071+500.00  0.0000       
5071+520.00  0.0000  10.00  0.00 
5071+540.00  0.0000  10.00  0.00 
5071+560.00  0.0000  10.00  0.00 
5071+580.00  1.1220  10.00  11.22 
5071+580.00  0.7150  0.00  0.00 
5071+600.00  0.0000  10.00  7.15 
5071+620.00  0.0000  10.00  0.00 
5071+640.00  0.0000  10.00  0.00 
5071+660.00  0.0000  10.00  0.00 
5071+660.00  0.0000  0.00  0.00 
5071+680.00  0.0000  10.00  0.00 
5071+700.00  0.0000  10.00  0.00 
5071+720.00  0.0000  10.00  0.00 
5071+740.00  0.0000  10.00  0.00 
5071+760.00  0.0000  10.00  0.00 
5071+780.00  0.0000  10.00  0.00 
5071+800.00  0.0000  10.00  0.00 
5071+820.00  0.0000  10.00  0.00 
5071+840.00  0.0000  10.00  0.00 
5071+860.00  5.3450  10.00  53.45 
5071+880.00  3.8310  10.00  91.76 
5071+900.00  0.0000  10.00  38.31 
5071+920.00  0.0000  10.00  0.00 
5071+940.00  0.0000  10.00  0.00 
5071+960.00  0.0000  10.00  0.00 
5071+980.00  0.0000  10.00  0.00 
5072+000.00  0.0000  10.00  0.00 
5072+020.00  0.0000  10.00  0.00 
5072+040.00  0.0000  10.00  0.00 
5072+060.00  0.0000  10.00  0.00 

121 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
5072+080.00  0.0000  10.00  0.00 
5072+100.00  0.0000  10.00  0.00 
5072+120.00  0.0000  10.00  0.00 
5072+140.00  0.0000  10.00  0.00 
5072+145.35  0.0000  2.67  0.00 
5072+160.00  0.0000  7.33  0.00 
5072+165.35  0.0000  2.67  0.00 
5072+175.00  0.0000  4.83  0.00 
5072+180.00  0.0000  2.50  0.00 
5072+185.00  0.0000  2.50  0.00 
5072+195.00  0.0000  5.00  0.00 
5072+200.00  0.0000  2.50  0.00 
5072+205.00  0.0000  2.50  0.00 
5072+215.00  0.0000  5.00  0.00 
5072+220.00  0.0000  2.50  0.00 
5072+225.00  0.0000  2.50  0.00 
5072+235.00  0.0000  5.00  0.00 
5072+240.00  0.0000  2.50  0.00 
5072+245.00  0.0000  2.50  0.00 
5072+255.00  0.0000  5.00  0.00 
5072+260.00  0.0000  2.50  0.00 
5072+265.00  0.0000  2.50  0.00 
5072+275.00  0.0000  5.00  0.00 
5072+280.00  0.0000  2.50  0.00 
5072+285.00  0.0000  2.50  0.00 
5072+295.00  0.0000  5.00  0.00 
5072+300.00  0.0000  2.50  0.00 
5072+305.00  0.0000  2.50  0.00 
5072+315.00  0.0000  5.00  0.00 
5072+320.00  0.0000  2.50  0.00 
5072+325.00  0.0000  2.50  0.00 
5072+335.00  0.0000  5.00  0.00 
5072+340.00  0.0000  2.50  0.00 
5072+360.00  0.0000  10.00  0.00 
5072+380.00  0.0000  10.00  0.00 
5072+400.00  0.0000  10.00  0.00 
5072+420.00  0.0000  10.00  0.00 
5072+440.00  0.0000  10.00  0.00 
5072+460.00  0.0000  10.00  0.00 
5072+480.00  0.0000  10.00  0.00 
5072+500.00  0.0000  10.00  0.00 
5072+520.00  0.0000  10.00  0.00 
5072+540.00  0.7740  10.00  7.74 
5072+560.00  0.0000  10.00  7.74 
5072+580.00  0.0000  10.00  0.00 
5072+600.00  0.0000  10.00  0.00 
5072+620.00  0.0000  10.00  0.00 
5072+640.00  0.0000  10.00  0.00 

122 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
5072+660.00  0.0000  10.00  0.00 
5072+660.00  0.0000  0.00  0.00 
5072+680.00  0.0000  10.00  0.00 
5072+700.00  0.0000  10.00  0.00 
5072+720.00  0.0000  10.00  0.00 
5072+740.00  0.0000  10.00  0.00 
5072+760.00  0.0000  10.00  0.00 
5072+760.00  0.0000  0.00  0.00 
5072+780.00  0.0000  10.00  0.00 
5072+795.00  0.0000  7.50  0.00 
5072+800.00  0.0000  2.50  0.00 
5072+820.00  0.0000  10.00  0.00 
5072+840.00  0.0000  10.00  0.00 
5072+860.00  0.0000  10.00  0.00 
5072+880.00  0.0000  10.00  0.00 
5072+900.00  0.2740  10.00  2.74 
5072+920.00  0.4150  10.00  6.89 
5072+940.00  0.3110  10.00  7.26 
5072+960.00  0.3730  10.00  6.84 
5072+980.00  0.0000  10.00  3.73 
5073+000.00  0.0000  10.00  0.00 
5073+020.00  0.0000  10.00  0.00 
5073+040.00  0.0000  10.00  0.00 
5073+060.00  0.0000  10.00  0.00 
5073+080.00  0.0000  10.00  0.00 
5073+100.00  0.0000  10.00  0.00 
5073+120.00  0.2490  10.00  2.49 
5073+140.00  0.0000  10.00  2.49 
5073+160.00  0.0000  10.00  0.00 
5073+180.00  0.1960  10.00  1.96 
5073+200.00  0.0000  10.00  1.96 
5073+220.00  0.3640  10.00  3.64 
5073+240.00  0.0000  10.00  3.64 
5073+260.00  0.0000  10.00  0.00 
5073+280.00  0.0000  10.00  0.00 
5073+300.00  0.0000  10.00  0.00 
5073+320.00  0.0000  10.00  0.00 
5073+340.00  0.0000  10.00  0.00 
5073+360.00  0.7870  10.00  7.87 
5073+380.00  1.1710  10.00  19.58 
5073+400.00  0.0000  10.00  11.71 
5073+420.00  0.0000  10.00  0.00 
5073+440.00  0.0000  10.00  0.00 
5073+460.00  0.0000  10.00  0.00 
5073+480.00  0.0000  10.00  0.00 
5073+500.00  0.0000  10.00  0.00 
5073+520.00  0.4730  10.00  4.73 
5073+540.00  0.3650  10.00  8.38 

123 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
5073+560.00  0.6220  10.00  9.87 
5073+580.00  0.8640  10.00  14.86 
5073+600.00  0.0000  10.00  8.64 
5073+620.00  0.0000  10.00  0.00 
5073+640.00  0.0000  10.00  0.00 
5073+660.00  0.0000  10.00  0.00 
5073+680.00  0.0000  10.00  0.00 
5073+700.00  0.0000  10.00  0.00 
5073+720.00  0.0000  10.00  0.00 
5073+740.00  0.1960  10.00  1.96 
5073+760.00  0.1720  10.00  3.68 
5073+780.00  0.0000  10.00  1.72 
5073+800.00  0.0000  10.00  0.00 
5073+815.00  0.0000  7.50  0.00 
5073+820.00  0.0000  2.50  0.00 
5073+825.00  0.0000  2.50  0.00 
5073+835.00  0.0000  5.00  0.00 
5073+840.00  0.0000  2.50  0.00 
5073+845.00  0.0000  2.50  0.00 
5073+855.00  0.0000  5.00  0.00 
5073+860.00  0.0000  2.50  0.00 
5073+865.00  0.0000  2.50  0.00 
5073+875.00  0.0000  5.00  0.00 
5073+880.00  0.0000  2.50  0.00 
5073+885.00  0.0000  2.50  0.00 
5073+895.00  0.0000  5.00  0.00 
5073+900.00  0.0000  2.50  0.00 
5073+905.00  0.0000  2.50  0.00 
5073+915.00  0.0000  5.00  0.00 
5073+920.00  0.0000  2.50  0.00 
5073+925.00  0.0000  2.50  0.00 
5073+935.00  0.0000  5.00  0.00 
5073+940.00  0.0000  2.50  0.00 
5073+945.00  0.0000  2.50  0.00 
5073+955.00  0.6400  5.00  3.20 
5073+960.00  0.7160  2.50  3.39 
5073+965.00  1.0900  2.50  4.52 
5073+975.00  1.0250  5.00  10.58 
5073+980.00  0.3920  2.50  3.54 
5073+985.32  0.0000  2.66  1.04 
5074+000.00  0.0000  7.34  0.00 
5074+005.32  0.0000  2.66  0.00 
5074+020.00  0.0000  7.34  0.00 
5074+040.00  0.0000  10.00  0.00 
5074+060.00  0.0000  10.00  0.00 
5074+080.00  0.0000  10.00  0.00 
5074+100.00  0.0000  10.00  0.00 
5074+120.00  0.0000  10.00  0.00 

124 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
5074+140.00  0.0000  10.00  0.00 
5074+160.00  0.0000  10.00  0.00 
5074+180.00  0.0000  10.00  0.00 
5074+200.00  0.0000  10.00  0.00 
5074+220.00  0.0000  10.00  0.00 
5074+240.00  0.0000  10.00  0.00 
5074+260.00  0.0000  10.00  0.00 
5074+280.00  0.0000  10.00  0.00 
5074+300.00  0.0000  10.00  0.00 
5074+320.00  0.0000  10.00  0.00 
5074+340.00  0.0000  10.00  0.00 
5074+360.00  0.9530  10.00  9.53 
5074+380.00  0.8130  10.00  17.66 
5074+400.00  1.2050  10.00  20.18 
5074+400.19  1.2200  0.09  0.23 
6000+617.91  1.2200       
6000+620.00  1.4260  1.04  2.76 
6000+640.00  1.6120  10.00  30.38 
6000+660.00  0.4610  10.00  20.73 
6000+680.00  0.0000  10.00  4.61 
6000+700.00  0.0000  10.00  0.00 
6000+700.01  0.0000  0.00  0.00 
6000+720.00  0.0000  10.00  0.00 
6000+740.00  0.0000  10.00  0.00 
6000+760.00  0.0000  10.00  0.00 
6000+780.00  0.0000  10.00  0.00 
6000+800.00  0.0000  10.00  0.00 
6000+800.00  0.0000  0.00  0.00 
6000+820.00  0.0000  10.00  0.00 
6000+840.00  1.3660  10.00  13.66 
6000+860.00  0.0000  10.00  13.66 
6000+880.00  0.0000  10.00  0.00 
6000+880.00  0.0000  0.00  0.00 
6000+900.00  0.0000  10.00  0.00 
6000+920.00  0.0000  10.00  0.00 
6000+940.00  0.0000  10.00  0.00 
6000+960.00  0.0000  10.00  0.00 
6000+980.00  0.0000  10.00  0.00 
6001+000.00  0.5590  10.00  5.59 
6001+020.00  1.9110  10.00  24.70 
6001+040.00  0.7380  10.00  26.49 
6001+060.00  0.0000  10.00  7.38 
6001+080.00  0.0000  10.00  0.00 
6001+100.00  0.0000  10.00  0.00 
6001+120.00  0.0000  10.00  0.00 
6001+140.00  0.0000  10.00  0.00 
6001+160.00  0.0000  10.00  0.00 
6001+180.00  0.0000  10.00  0.00 

125 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6001+200.00  0.0000  10.00  0.00 
6001+220.00  0.0000  10.00  0.00 
6001+240.00  0.0000  10.00  0.00 
6001+260.00  0.0000  10.00  0.00 
6001+280.00  0.0000  10.00  0.00 
6001+300.00  2.1170  10.00  21.17 
6001+320.00  0.0000  10.00  21.17 
6001+340.00  0.0000  10.00  0.00 
6001+360.00  0.0000  10.00  0.00 
6001+380.00  0.0000  10.00  0.00 
6001+400.00  5.3940  10.00  53.94 
6001+420.00  2.6330  10.00  80.27 
6001+440.00  0.0000  10.00  26.33 
6001+460.00  0.0000  10.00  0.00 
6001+480.00  0.0000  10.00  0.00 
6001+500.00  0.0000  10.00  0.00 
6001+520.00  0.0000  10.00  0.00 
6001+540.00  0.7150  10.00  7.15 
6001+560.00  0.0000  10.00  7.15 
6001+580.00  0.0000  10.00  0.00 
6001+600.00  0.0000  10.00  0.00 
6001+620.00  0.0000  10.00  0.00 
6001+640.00  0.0000  10.00  0.00 
6001+660.00  0.0000  10.00  0.00 
6001+680.00  0.0000  10.00  0.00 
6001+700.00  0.0000  10.00  0.00 
6001+720.00  0.0000  10.00  0.00 
6001+740.00  0.0000  10.00  0.00 
6001+760.00  0.0000  10.00  0.00 
6001+780.00  0.0000  10.00  0.00 
6001+800.00  0.0000  10.00  0.00 
6001+820.00  0.0000  10.00  0.00 
6001+840.00  0.0000  10.00  0.00 
6001+860.00  0.0000  10.00  0.00 
6001+880.00  0.0000  10.00  0.00 
6001+900.00  0.0000  10.00  0.00 
6001+920.00  0.0000  10.00  0.00 
6001+940.00  0.0000  10.00  0.00 
6001+960.00  0.0000  10.00  0.00 
6001+980.00  0.0000  10.00  0.00 
6002+000.00  0.0000  10.00  0.00 
6002+020.00  0.0000  10.00  0.00 
6002+040.00  0.0000  10.00  0.00 
6002+060.00  0.0000  10.00  0.00 
6002+080.00  0.0000  10.00  0.00 
6002+100.00  0.0000  10.00  0.00 
6002+120.00  0.0000  10.00  0.00 
6002+140.00  0.9960  10.00  9.96 

126 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6002+160.00  0.0000  10.00  9.96 
6002+180.00  0.0000  10.00  0.00 
6002+200.00  0.0000  10.00  0.00 
6002+220.00  8.8940  10.00  88.94 
6002+240.00  8.1100  10.00  170.04 
6002+260.00  0.0000  10.00  81.10 
6002+280.00  0.0000  10.00  0.00 
6002+300.00  0.9450  10.00  9.45 
6002+320.00  0.6980  10.00  16.43 
6002+340.00  0.0000  10.00  6.98 
6002+360.00  0.0000  10.00  0.00 
6002+380.00  2.0680  10.00  20.68 
6002+400.00  0.0000  10.00  20.68 
6002+420.00  0.0000  10.00  0.00 
6002+440.00  0.0000  10.00  0.00 
6002+460.00  0.0000  10.00  0.00 
6002+480.00  0.0000  10.00  0.00 
6002+500.00  0.0000  10.00  0.00 
6002+520.00  0.0000  10.00  0.00 
6002+540.00  0.0000  10.00  0.00 
6002+560.00  0.0000  10.00  0.00 
6002+580.00  0.0000  10.00  0.00 
6002+600.00  4.3490  10.00  43.49 
6002+620.00  0.0000  10.00  43.49 
6002+640.00  0.0000  10.00  0.00 
6002+660.00  0.0000  10.00  0.00 
6002+680.00  0.0000  10.00  0.00 
6002+700.00  0.0000  10.00  0.00 
6002+720.00  0.0000  10.00  0.00 
6002+740.00  0.0000  10.00  0.00 
6002+760.00  0.0000  10.00  0.00 
6002+780.00  0.0000  10.00  0.00 
6002+800.00  0.0000  10.00  0.00 
6002+820.00  0.0000  10.00  0.00 
6002+830.00  0.0000  5.00  0.00 
6002+830.00  0.0000  0.00  0.00 
6002+840.00  0.0000  5.00  0.00 
6002+860.00  0.0000  10.00  0.00 
6002+880.00  0.0000  10.00  0.00 
6002+900.00  0.0000  10.00  0.00 
6002+920.00  0.0000  10.00  0.00 
6002+940.00  0.0000  10.00  0.00 
6002+960.00  0.0000  10.00  0.00 
6002+980.00  0.0000  10.00  0.00 
6002+980.00  0.0000  0.00  0.00 
6003+000.00  0.0000  10.00  0.00 
6003+020.00  0.0000  10.00  0.00 
6003+040.00  0.0000  10.00  0.00 

127 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6003+060.00  0.0000  10.00  0.00 
6003+080.00  0.0000  10.00  0.00 
6003+100.00  0.0000  10.00  0.00 
6003+120.00  0.0000  10.00  0.00 
6003+140.00  0.0000  10.00  0.00 
6003+160.00  0.0000  10.00  0.00 
6003+180.00  0.0000  10.00  0.00 
6003+200.00  0.0000  10.00  0.00 
6003+220.00  0.0000  10.00  0.00 
6003+240.00  0.0000  10.00  0.00 
6003+260.00  0.0000  10.00  0.00 
6003+280.00  0.0000  10.00  0.00 
6003+300.00  0.0000  10.00  0.00 
6003+320.00  0.0000  10.00  0.00 
6003+340.00  0.0000  10.00  0.00 
6003+360.00  0.0000  10.00  0.00 
6003+380.00  0.0000  10.00  0.00 
6003+400.00  0.0000  10.00  0.00 
6003+420.00  0.0000  10.00  0.00 
6003+440.00  0.0000  10.00  0.00 
6003+460.00  0.0000  10.00  0.00 
6003+480.00  0.0000  10.00  0.00 
6003+500.00  0.0000  10.00  0.00 
6003+520.00  0.0000  10.00  0.00 
6003+536.24  0.0000  8.12  0.00 
6003+536.24  0.0000  0.00  0.00 
6003+536.24  0.0000  0.00  0.00 
6003+540.00  0.0000  1.88  0.00 
6003+560.00  0.0000  10.00  0.00 
6003+568.24  0.0000  4.12  0.00 
6003+568.24  0.0000  0.00  0.00 
6003+568.24  0.0000  0.00  0.00 
6003+580.00  0.0000  5.88  0.00 
6003+600.00  0.0000  10.00  0.00 
6003+620.00  0.0000  10.00  0.00 
6003+640.00  0.0000  10.00  0.00 
6003+660.00  0.0000  10.00  0.00 
6003+680.00  0.0000  10.00  0.00 
6003+700.00  0.0000  10.00  0.00 
6003+720.00  0.0000  10.00  0.00 
6003+740.00  0.0000  10.00  0.00 
6003+760.00  0.0000  10.00  0.00 
6003+780.00  0.0000  10.00  0.00 
6003+800.00  0.0000  10.00  0.00 
6003+820.00  0.0000  10.00  0.00 
6003+840.00  0.0000  10.00  0.00 
6003+860.00  0.0000  10.00  0.00 
6003+880.00  0.0000  10.00  0.00 

128 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6003+900.00  0.0000  10.00  0.00 
6003+900.00  0.0000  0.00  0.00 
6003+920.00  0.0000  10.00  0.00 
6003+940.00  0.0000  10.00  0.00 
6003+960.00  0.0000  10.00  0.00 
6003+974.92  0.0000  7.46  0.00 
6003+980.00  0.0000  2.54  0.00 
6004+000.00  0.0000  10.00  0.00 
6004+020.00  0.0000  10.00  0.00 
6004+040.00  0.0000  10.00  0.00 
6004+060.00  0.0000  10.00  0.00 
6004+080.00  0.0000  10.00  0.00 
6004+100.00  0.0000  10.00  0.00 
6004+120.00  0.0000  10.00  0.00 
6004+124.92  0.0000  2.46  0.00 
6004+140.00  0.0000  7.54  0.00 
6004+160.00  0.0000  10.00  0.00 
6004+180.00  0.0000  10.00  0.00 
6004+200.00  0.0000  10.00  0.00 
6004+220.00  0.0000  10.00  0.00 
6004+240.00  0.0000  10.00  0.00 
6004+260.00  0.0000  10.00  0.00 
6004+280.00  0.0000  10.00  0.00 
6004+300.00  0.0000  10.00  0.00 
6004+320.00  0.0000  10.00  0.00 
6004+340.00  0.0000  10.00  0.00 
6004+355.41  0.0000  7.71  0.00 
6004+360.00  0.0000  2.29  0.00 
6004+380.00  0.0000  10.00  0.00 
6004+400.00  0.5980  10.00  5.98 
6004+420.00  0.0000  10.00  5.98 
6004+440.00  0.0000  10.00  0.00 
6004+460.00  0.0000  10.00  0.00 
6004+480.00  0.0000  10.00  0.00 
6004+500.00  0.0000  10.00  0.00 
6004+505.41  0.0000  2.71  0.00 
6004+520.00  0.0000  7.29  0.00 
6004+540.00  1.3320  10.00  13.32 
6004+560.00  0.0000  10.00  13.32 
6004+580.00  0.0000  10.00  0.00 
6004+600.00  0.0000  10.00  0.00 
6004+615.00  0.4110  7.50  3.08 
6004+615.00  0.4690  0.00  0.00 
6004+620.00  0.7050  2.50  2.94 
6004+640.00  0.7740  10.00  14.79 
6004+660.00  0.0000  10.00  7.74 
6004+680.00  0.7740  10.00  7.74 
6004+700.00  0.5880  10.00  13.62 

129 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6004+720.00  0.0000  10.00  5.88 
6004+740.00  0.0000  10.00  0.00 
6004+760.00  0.0000  10.00  0.00 
6004+780.00  0.0000  10.00  0.00 
6004+800.00  0.0000  10.00  0.00 
6004+820.00  0.0000  10.00  0.00 
6004+840.00  0.0000  10.00  0.00 
6004+860.00  0.0000  10.00  0.00 
6004+880.00  0.0000  10.00  0.00 
6004+900.00  0.0000  10.00  0.00 
6004+920.00  0.0000  10.00  0.00 
6004+940.00  0.0000  10.00  0.00 
6004+960.00  0.0000  10.00  0.00 
6004+980.00  0.0000  10.00  0.00 
6005+000.00  0.4450  10.00  4.45 
6005+020.00  0.5170  10.00  9.62 
6005+040.00  0.0000  10.00  5.17 
6005+060.00  0.3830  10.00  3.83 
6005+080.00  0.0000  10.00  3.83 
6005+100.00  0.0000  10.00  0.00 
6005+104.49  0.0000  2.24  0.00 
6005+120.00  0.0000  7.76  0.00 
6005+140.00  0.0000  10.00  0.00 
6005+160.00  0.4320  10.00  4.32 
6005+180.00  0.4880  10.00  9.20 
6005+200.00  0.0000  10.00  4.88 
6005+220.00  0.0000  10.00  0.00 
6005+240.00  0.0000  10.00  0.00 
6005+254.49  0.0000  7.24  0.00 
6005+260.00  0.0000  2.76  0.00 
6005+280.00  0.0000  10.00  0.00 
6005+300.00  0.0000  10.00  0.00 
6005+320.00  0.0000  10.00  0.00 
6005+340.00  0.3990  10.00  3.99 
6005+360.00  0.4990  10.00  8.98 
6005+361.69  0.0000  0.85  0.42 
6005+380.00  0.0000  9.15  0.00 
6005+400.00  0.0000  10.00  0.00 
6005+420.00  0.0000  10.00  0.00 
6005+440.00  0.0000  10.00  0.00 
6005+460.00  0.0000  10.00  0.00 
6005+480.00  0.0000  10.00  0.00 
6005+500.00  0.0000  10.00  0.00 
6005+511.69  0.0000  5.85  0.00 
6005+520.00  0.0000  4.15  0.00 
6005+540.00  0.0000  10.00  0.00 
6005+560.00  0.0000  10.00  0.00 
6005+580.00  0.0000  10.00  0.00 

130 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6005+600.00  0.0000  10.00  0.00 
6005+620.00  0.0000  10.00  0.00 
6005+640.00  0.0000  10.00  0.00 
6005+660.00  0.0000  10.00  0.00 
6005+680.00  0.0000  10.00  0.00 
6005+700.00  0.0000  10.00  0.00 
6005+720.00  0.0000  10.00  0.00 
6005+740.00  0.9650  10.00  9.65 
6005+760.00  0.8960  10.00  18.61 
6005+780.00  0.5910  10.00  14.87 
6005+800.00  0.5190  10.00  11.10 
6005+820.00  0.7460  10.00  12.65 
6005+840.00  1.2150  10.00  19.61 
6005+860.00  0.0000  10.00  12.15 
6005+880.00  0.0000  10.00  0.00 
6005+900.00  0.0000  10.00  0.00 
6005+920.00  0.0000  10.00  0.00 
6005+940.00  0.8690  10.00  8.69 
6005+960.00  7.2690  10.00  81.38 
6005+980.00  0.3430  10.00  76.12 
6006+000.00  0.0000  10.00  3.43 
 

TABLA 19 VOLUMEN DE CORTE PARA EL TRAMO DEL 6017+000 AL 6030+000 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6017+000.00  0.0000     
6017+020.00  0.0000  10.00  0.00 
6017+027.24  0.0000  3.62  0.00 
6017+040.00  0.0000  6.38  0.00 
6017+060.00  0.0000  10.00  0.00 
6017+080.00  0.0000  10.00  0.00 
6017+100.00  0.0000  10.00  0.00 
6017+120.00  0.0000  10.00  0.00 
6017+140.00  0.0000  10.00  0.00 
6017+160.00  0.0000  10.00  0.00 
6017+180.00  0.0000  10.00  0.00 
6017+200.00  0.0000  10.00  0.00 
6017+220.00  0.0000  10.00  0.00 
6017+240.00  0.0000  10.00  0.00 
6017+260.00  0.0000  10.00  0.00 
6017+280.00  0.0000  10.00  0.00 
6017+300.00  0.0000  10.00  0.00 
6017+320.00  0.0000  10.00  0.00 
6017+340.00  0.0000  10.00  0.00 
6017+360.00  0.0000  10.00  0.00 
6017+380.00  0.0000  10.00  0.00 

131 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6017+400.00  0.0000  10.00  0.00 
6017+420.00  0.0000  10.00  0.00 
6017+440.00  0.0000  10.00  0.00 
6017+460.00  0.0000  10.00  0.00 
6017+480.00  0.0000  10.00  0.00 
6017+500.00  0.0000  10.00  0.00 
6017+520.00  0.0000  10.00  0.00 
6017+540.00  0.0000  10.00  0.00 
6017+560.00  0.0000  10.00  0.00 
6017+579.55  0.0000  9.78  0.00 
6017+580.00  0.0000  0.22  0.00 
6017+600.00  0.0000  10.00  0.00 
6017+606.68  0.0000  3.34  0.00 
6017+606.68  0.0000  0.00  0.00 
6017+606.68  0.0000  0.00  0.00 
6017+620.00  0.0000  6.66  0.00 
6017+640.00  0.0000  10.00  0.00 
6017+660.00  0.0000  10.00  0.00 
6017+670.68  0.0000  5.34  0.00 
6017+670.68  0.0000  0.00  0.00 
6017+670.68  0.0000  0.00  0.00 
6017+680.00  0.0000  4.66  0.00 
6017+700.00  0.0000  10.00  0.00 
6017+720.00  0.0000  10.00  0.00 
6017+729.55  0.0000  4.78  0.00 
6017+740.00  0.0000  5.22  0.00 
6017+760.00  0.0000  10.00  0.00 
6017+780.00  0.0000  10.00  0.00 
6017+800.00  0.0000  10.00  0.00 
6017+820.00  0.0000  10.00  0.00 
6017+840.00  0.0000  10.00  0.00 
6017+860.00  0.0000  10.00  0.00 
6017+880.00  0.0000  10.00  0.00 
6017+900.00  0.0000  10.00  0.00 
6017+902.74  0.0000  1.37  0.00 
6017+920.00  0.0000  8.63  0.00 
6017+940.00  0.0000  10.00  0.00 
6017+960.00  0.0000  10.00  0.00 
6017+980.00  0.0000  10.00  0.00 
6018+000.00  0.0000  10.00  0.00 
6018+020.00  0.0000  10.00  0.00 
6018+040.00  0.0000  10.00  0.00 
6018+052.74  0.0000  6.37  0.00 
6018+060.00  0.0000  3.63  0.00 
6018+080.00  0.0000  10.00  0.00 
6018+100.00  0.0000  10.00  0.00 
6018+120.00  0.0000  10.00  0.00 
6018+140.00  0.0000  10.00  0.00 

132 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6018+160.00  0.0000  10.00  0.00 
6018+180.00  0.0000  10.00  0.00 
6018+200.00  0.0000  10.00  0.00 
6018+220.00  0.0000  10.00  0.00 
6018+240.00  0.0000  10.00  0.00 
6018+250.00  0.0000  5.00  0.00 
6018+250.00  0.0000  0.00  0.00 
6018+260.00  0.0000  5.00  0.00 
6018+280.00  0.0000  10.00  0.00 
6018+300.00  0.0000  10.00  0.00 
6018+320.00  0.0000  10.00  0.00 
6018+340.00  0.0000  10.00  0.00 
6018+360.00  0.0000  10.00  0.00 
6018+380.00  0.0000  10.00  0.00 
6018+400.00  0.0000  10.00  0.00 
6018+420.00  0.0000  10.00  0.00 
6018+440.00  0.0000  10.00  0.00 
6018+460.00  0.0000  10.00  0.00 
6018+480.00  0.0000  10.00  0.00 
6018+500.00  0.0000  10.00  0.00 
6018+520.00  0.0000  10.00  0.00 
6018+540.00  0.0000  10.00  0.00 
6018+560.00  0.0000  10.00  0.00 
6018+580.00  0.0000  10.00  0.00 
6018+600.00  0.0000  10.00  0.00 
6018+620.00  0.0000  10.00  0.00 
6018+640.00  0.0000  10.00  0.00 
6018+660.00  0.0000  10.00  0.00 
6018+680.00  0.0000  10.00  0.00 
6018+700.00  0.0000  10.00  0.00 
6018+720.00  0.0000  10.00  0.00 
6018+727.00  0.0000  3.50  0.00 
6018+740.00  0.0000  6.50  0.00 
6018+747.00  0.0000  3.50  0.00 
6018+757.00  0.0000  5.00  0.00 
6018+760.00  0.0000  1.50  0.00 
6018+767.00  0.0000  3.50  0.00 
6018+777.00  0.0000  5.00  0.00 
6018+780.00  0.0000  1.50  0.00 
6018+787.00  0.0000  3.50  0.00 
6018+797.00  0.0000  5.00  0.00 
6018+800.00  0.0000  1.50  0.00 
6018+807.00  0.0000  3.50  0.00 
6018+817.00  0.0000  5.00  0.00 
6018+820.00  0.0000  1.50  0.00 
6018+827.00  0.0000  3.50  0.00 
6018+837.00  0.0000  5.00  0.00 
6018+840.00  0.0000  1.50  0.00 

133 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6018+847.00  0.0000  3.50  0.00 
6018+857.00  0.0000  5.00  0.00 
6018+860.00  0.0000  1.50  0.00 
6018+867.00  0.4990  3.50  1.75 
6018+880.00  0.6620  6.50  7.55 
6018+900.00  0.0000  10.00  6.62 
6018+920.00  1.1380  10.00  11.38 
6018+940.00  5.3100  10.00  64.48 
6018+960.00  7.1060  10.00  124.16 
6018+980.00  1.0190  10.00  81.25 
6019+000.00  0.0000  10.00  10.19 
6019+020.00  0.0000  10.00  0.00 
6019+040.00  0.0000  10.00  0.00 
6019+060.00  0.0000  10.00  0.00 
6019+070.00  0.0000  5.00  0.00 
6019+070.00  0.0000  0.00  0.00 
6019+080.00  0.0000  5.00  0.00 
6019+100.00  0.0000  10.00  0.00 
6019+120.00  0.0000  10.00  0.00 
6019+140.00  0.0000  10.00  0.00 
6019+160.00  0.0000  10.00  0.00 
6019+160.00  0.0000  0.00  0.00 
6019+180.00  0.0000  10.00  0.00 
6019+200.00  6.8150  10.00  68.15 
6019+220.00  9.5370  10.00  163.52 
6019+240.00  0.0000  10.00  95.37 
6019+247.00  0.0000  3.50  0.00 
6019+257.00  0.0000  5.00  0.00 
6019+260.00  0.0000  1.50  0.00 
6019+267.00  0.0000  3.50  0.00 
6019+277.00  0.0000  5.00  0.00 
6019+280.00  0.0000  1.50  0.00 
6019+287.00  0.0000  3.50  0.00 
6019+297.00  0.0000  5.00  0.00 
6019+300.00  0.0000  1.50  0.00 
6019+307.00  0.0000  3.50  0.00 
6019+317.00  0.0000  5.00  0.00 
6019+320.00  0.0000  1.50  0.00 
6019+327.00  0.0000  3.50  0.00 
6019+337.00  0.0000  5.00  0.00 
6019+340.00  0.0000  1.50  0.00 
6019+347.00  0.0000  3.50  0.00 
6019+357.00  0.0000  5.00  0.00 
6019+360.00  0.0000  1.50  0.00 
6019+366.83  0.0000  3.42  0.00 
6019+380.00  0.0000  6.58  0.00 
6019+386.83  0.0000  3.42  0.00 
6019+400.00  0.0000  6.58  0.00 

134 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6019+420.00  0.0000  10.00  0.00 
6019+440.00  0.0000  10.00  0.00 
6019+460.00  0.0000  10.00  0.00 
6019+480.00  0.0000  10.00  0.00 
6019+500.00  0.0000  10.00  0.00 
6019+520.00  0.0000  10.00  0.00 
6019+540.00  0.0000  10.00  0.00 
6019+560.00  0.0000  10.00  0.00 
6019+570.00  0.0000  5.00  0.00 
6019+580.00  0.0000  5.00  0.00 
6019+590.00  0.0000  5.00  0.00 
6019+600.00  0.0000  5.00  0.00 
6019+610.00  0.0000  5.00  0.00 
6019+620.00  0.0000  5.00  0.00 
6019+630.00  0.0000  5.00  0.00 
6019+640.00  0.0000  5.00  0.00 
6019+650.00  0.0000  5.00  0.00 
6019+660.00  0.0000  5.00  0.00 
6019+670.00  0.0000  5.00  0.00 
6019+680.00  0.0000  5.00  0.00 
6019+690.00  0.0000  5.00  0.00 
6019+700.00  0.0000  5.00  0.00 
6019+710.00  0.0000  5.00  0.00 
6019+720.00  0.0000  5.00  0.00 
6019+730.00  0.0000  5.00  0.00 
6019+740.00  0.0000  5.00  0.00 
6019+750.00  0.0000  5.00  0.00 
6019+760.00  0.3390  5.00  1.70 
6019+770.00  1.5150  5.00  9.27 
6019+780.00  1.5010  5.00  15.08 
6019+800.00  0.0000  10.00  15.01 
6019+820.00  0.0000  10.00  0.00 
6019+840.00  0.0000  10.00  0.00 
6019+860.00  0.0000  10.00  0.00 
6019+880.00  0.0000  10.00  0.00 
6019+900.00  0.0000  10.00  0.00 
6019+920.00  0.0000  10.00  0.00 
6019+940.00  0.0000  10.00  0.00 
6019+960.00  0.0000  10.00  0.00 
6019+980.00  0.0000  10.00  0.00 
6020+000.00  0.0000  10.00  0.00 
6020+020.00  0.0000  10.00  0.00 
6020+040.00  0.0000  10.00  0.00 
6020+060.00  2.7910  10.00  27.91 
6020+080.00  0.5060  10.00  32.97 
6020+100.00  0.0000  10.00  5.06 
6020+120.00  0.0000  10.00  0.00 
6020+140.00  0.0000  10.00  0.00 

135 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6020+160.00  0.0000  10.00  0.00 
6020+180.00  0.0000  10.00  0.00 
6020+200.00  0.0000  10.00  0.00 
6020+220.00  0.0000  10.00  0.00 
6020+240.00  0.0000  10.00  0.00 
6020+260.00  0.0000  10.00  0.00 
6020+280.00  0.0000  10.00  0.00 
6020+300.00  0.0000  10.00  0.00 
6020+320.00  0.0000  10.00  0.00 
6020+340.00  0.0000  10.00  0.00 
6020+360.00  0.0000  10.00  0.00 
6020+380.00  0.0000  10.00  0.00 
6020+400.00  0.0000  10.00  0.00 
6020+420.00  0.0000  10.00  0.00 
6020+440.00  0.0000  10.00  0.00 
6020+460.00  0.0000  10.00  0.00 
6020+480.00  0.0000  10.00  0.00 
6020+500.00  0.0000  10.00  0.00 
6020+520.00  0.0000  10.00  0.00 
6020+540.00  0.0000  10.00  0.00 
6020+560.00  0.0000  10.00  0.00 
6020+580.00  0.0000  10.00  0.00 
6020+600.00  0.0000  10.00  0.00 
6020+620.00  0.0000  10.00  0.00 
6020+640.00  0.0000  10.00  0.00 
6020+660.00  0.0000  10.00  0.00 
6020+680.00  0.0000  10.00  0.00 
6020+700.00  0.0000  10.00  0.00 
6020+720.00  0.0000  10.00  0.00 
6020+740.00  0.0000  10.00  0.00 
6020+760.00  0.0000  10.00  0.00 
6020+780.00  0.0000  10.00  0.00 
6020+800.00  0.0000  10.00  0.00 
6020+820.00  0.0000  10.00  0.00 
6020+840.00  0.0000  10.00  0.00 
6020+860.00  0.6620  10.00  6.62 
6020+880.00  0.0000  10.00  6.62 
6020+880.00  0.0000  0.00  0.00 
6020+900.00  0.0000  10.00  0.00 
6020+920.00  0.0000  10.00  0.00 
6020+940.00  0.0000  10.00  0.00 
6020+960.00  0.0000  10.00  0.00 
6020+980.00  0.0000  10.00  0.00 
6021+000.00  0.0000  10.00  0.00 
6021+020.00  0.0000  10.00  0.00 
6021+040.00  0.0000  10.00  0.00 
6021+060.00  9.0650  10.00  90.65 
6021+080.00  3.8180  10.00  128.83 

136 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6021+100.00  0.0000  10.00  38.18 
6021+120.00  0.0000  10.00  0.00 
6021+140.00  0.0000  10.00  0.00 
6021+160.00  0.0000  10.00  0.00 
6021+180.00  0.0000  10.00  0.00 
6021+200.00  0.0000  10.00  0.00 
6021+220.00  0.0000  10.00  0.00 
6021+240.00  0.0000  10.00  0.00 
6021+250.00  0.0000  5.00  0.00 
6021+260.00  0.0000  5.00  0.00 
6021+270.00  0.0000  5.00  0.00 
6021+280.00  0.0000  5.00  0.00 
6021+290.00  0.0000  5.00  0.00 
6021+300.00  0.0000  5.00  0.00 
6021+310.00  0.0000  5.00  0.00 
6021+320.00  0.0000  5.00  0.00 
6021+330.00  0.0000  5.00  0.00 
6021+340.00  0.0000  5.00  0.00 
6021+350.00  0.0000  5.00  0.00 
6021+360.00  0.0000  5.00  0.00 
6021+370.00  0.0000  5.00  0.00 
6021+380.00  0.0000  5.00  0.00 
6021+390.00  0.0000  5.00  0.00 
6021+400.00  0.0000  5.00  0.00 
6021+409.97  0.0000  4.99  0.00 
6021+420.00  0.0000  5.01  0.00 
6021+429.97  0.0000  4.99  0.00 
6021+440.00  0.0000  5.01  0.00 
6021+455.00  0.0000  7.50  0.00 
6021+455.00  0.0000  0.00  0.00 
6021+460.00  0.0000  2.50  0.00 
6021+480.00  0.0000  10.00  0.00 
6021+500.00  0.0000  10.00  0.00 
6021+520.00  0.0000  10.00  0.00 
6021+540.00  0.0000  10.00  0.00 
6021+560.00  0.0000  10.00  0.00 
6021+580.00  0.0000  10.00  0.00 
6021+600.00  0.0000  10.00  0.00 
6021+620.00  0.0000  10.00  0.00 
6021+640.00  0.0000  10.00  0.00 
6021+660.00  0.0000  10.00  0.00 
6021+680.00  0.0000  10.00  0.00 
6021+700.00  0.0000  10.00  0.00 
6021+702.74  0.0000  1.37  0.00 
6021+720.00  0.0000  8.63  0.00 
6021+740.00  0.0000  10.00  0.00 
6021+760.00  0.0000  10.00  0.00 
6021+775.00  0.0000  7.50  0.00 

137 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6021+775.00  0.0000  0.00  0.00 
6021+780.00  0.0000  2.50  0.00 
6021+800.00  0.0000  10.00  0.00 
6021+820.00  0.0000  10.00  0.00 
6021+840.00  0.0000  10.00  0.00 
6021+852.74  0.0000  6.37  0.00 
6021+860.00  0.0000  3.63  0.00 
6021+880.00  0.0000  10.00  0.00 
6021+900.00  0.0000  10.00  0.00 
6021+920.00  0.0000  10.00  0.00 
6021+940.00  0.0000  10.00  0.00 
6021+960.00  0.0000  10.00  0.00 
6021+980.00  0.0000  10.00  0.00 
6022+000.00  0.0000  10.00  0.00 
6022+020.00  0.0000  10.00  0.00 
6022+040.00  0.0000  10.00  0.00 
6022+060.00  0.0000  10.00  0.00 
6022+080.00  0.0000  10.00  0.00 
6022+095.00  0.0000  7.50  0.00 
6022+095.00  0.0000  0.00  0.00 
6022+100.00  0.0000  2.50  0.00 
6022+100.00  0.0000  0.00  0.00 
6022+120.00  0.0000  10.00  0.00 
6022+140.00  1.8880  10.00  18.88 
6022+160.00  0.0000  10.00  18.88 
6022+170.00  1.3870  5.00  6.94 
6022+170.00  1.4700  0.00  0.00 
6022+180.00  5.7060  5.00  35.88 
6022+200.00  0.8130  10.00  65.19 
6022+220.00  0.0000  10.00  8.13 
6022+240.00  0.3170  10.00  3.17 
6022+260.00  0.0000  10.00  3.17 
6022+280.00  0.0000  10.00  0.00 
6022+300.00  0.0000  10.00  0.00 
6022+320.00  0.0000  10.00  0.00 
6022+340.00  0.0000  10.00  0.00 
6022+360.00  0.0000  10.00  0.00 
6022+380.00  0.0000  10.00  0.00 
6022+400.00  0.0000  10.00  0.00 
6022+420.00  0.0000  10.00  0.00 
6022+440.00  0.0000  10.00  0.00 
6022+460.00  0.0000  10.00  0.00 
6022+480.00  0.0000  10.00  0.00 
6022+500.00  0.0000  10.00  0.00 
6022+520.00  0.0000  10.00  0.00 
6022+540.00  0.0000  10.00  0.00 
6022+560.00  0.0000  10.00  0.00 
6022+580.00  0.0000  10.00  0.00 

138 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6022+600.00  0.0010  10.00  0.01 
6022+620.00  0.0000  10.00  0.01 
6022+640.00  0.0010  10.00  0.01 
6022+660.00  0.0010  10.00  0.02 
6022+680.00  0.0000  10.00  0.01 
6022+700.00  0.0000  10.00  0.00 
6022+720.00  0.0000  10.00  0.00 
6022+740.00  0.0000  10.00  0.00 
6022+760.00  0.0000  10.00  0.00 
6022+780.00  0.0000  10.00  0.00 
6022+800.00  0.0000  10.00  0.00 
6022+820.00  0.0000  10.00  0.00 
6022+840.00  0.0000  10.00  0.00 
6022+860.00  0.0010  10.00  0.01 
6022+880.00  0.0000  10.00  0.01 
6022+900.00  0.0000  10.00  0.00 
6022+920.00  0.0010  10.00  0.01 
6022+940.00  0.0010  10.00  0.02 
6022+960.00  0.0010  10.00  0.02 
6022+980.00  0.0000  10.00  0.01 
6023+000.00  0.0010  10.00  0.01 
6023+020.00  0.0010  10.00  0.02 
6023+040.00  0.0000  10.00  0.01 
6023+060.00  0.0010  10.00  0.01 
6023+080.00  0.0010  10.00  0.02 
6023+100.00  0.0000  10.00  0.01 
6023+120.00  0.0000  10.00  0.00 
6023+140.00  0.0000  10.00  0.00 
6023+160.00  0.0000  10.00  0.00 
6023+180.00  0.0000  10.00  0.00 
6023+200.00  0.0000  10.00  0.00 
6023+220.00  0.0000  10.00  0.00 
6023+240.00  0.0000  10.00  0.00 
6023+260.00  0.0000  10.00  0.00 
6023+280.00  0.0000  10.00  0.00 
6023+300.00  0.0000  10.00  0.00 
6023+320.00  0.0000  10.00  0.00 
6023+340.00  0.0010  10.00  0.01 
6023+360.00  0.0000  10.00  0.01 
6023+380.00  0.0000  10.00  0.00 
6023+400.00  0.0000  10.00  0.00 
6023+420.00  0.0000  10.00  0.00 
6023+440.00  0.0000  10.00  0.00 
6023+460.00  0.0000  10.00  0.00 
6023+480.00  0.0000  10.00  0.00 
6023+500.00  0.0010  10.00  0.01 
6023+520.00  0.0000  10.00  0.01 
6023+540.00  0.0000  10.00  0.00 

139 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6023+560.00  0.0000  10.00  0.00 
6023+580.00  0.0000  10.00  0.00 
6023+600.00  0.0010  10.00  0.01 
6023+620.00  0.0010  10.00  0.02 
6023+640.00  0.0010  10.00  0.02 
6023+660.00  0.0000  10.00  0.01 
6023+680.00  0.0000  10.00  0.00 
6023+700.00  0.0010  10.00  0.01 
6023+720.00  0.0000  10.00  0.01 
6023+740.00  0.0010  10.00  0.01 
6023+760.00  0.0000  10.00  0.01 
6023+780.00  0.0000  10.00  0.00 
6023+800.00  0.0010  10.00  0.01 
6023+820.00  0.0000  10.00  0.01 
6023+840.00  0.0000  10.00  0.00 
6023+860.00  0.0000  10.00  0.00 
6023+880.00  0.0000  10.00  0.00 
6023+880.00  0.0010  0.00  0.00 
6023+900.00  0.0000  10.00  0.01 
6023+920.00  0.0000  10.00  0.00 
6023+940.00  0.0000  10.00  0.00 
6023+960.00  0.0000  10.00  0.00 
6023+980.00  0.0000  10.00  0.00 
6024+000.00  0.0000  10.00  0.00 
6024+020.00  0.0000  10.00  0.00 
6024+040.00  0.0000  10.00  0.00 
6024+049.07  0.0000  4.54  0.00 
6024+060.00  0.0000  5.46  0.00 
6024+080.00  0.0000  10.00  0.00 
6024+100.00  0.0000  10.00  0.00 
6024+120.00  0.0000  10.00  0.00 
6024+140.00  0.0000  10.00  0.00 
6024+160.00  0.0000  10.00  0.00 
6024+180.00  0.0000  10.00  0.00 
6024+199.07  0.0000  9.54  0.00 
6024+200.00  0.0000  0.46  0.00 
6024+220.00  4.7210  10.00  47.21 
6024+240.00  0.4020  10.00  51.23 
6024+260.00  0.0000  10.00  4.02 
6024+270.00  0.0000  5.00  0.00 
6024+270.00  0.0000  0.00  0.00 
6024+280.00  0.0000  5.00  0.00 
6024+300.00  0.0000  10.00  0.00 
6024+316.48  0.0000  8.24  0.00 
6024+320.00  0.0000  1.76  0.00 
6024+340.00  0.0000  10.00  0.00 
6024+360.00  0.0000  10.00  0.00 
6024+376.40  0.0000  8.20  0.00 

140 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6024+376.40  0.0000     
6024+380.00  0.0000  1.80  0.00 
6024+400.00  0.0000  10.00  0.00 
6024+420.00  0.0000  10.00  0.00 
6024+440.00  0.0000  10.00  0.00 
6024+460.00  0.0000  10.00  0.00 
6024+480.00  0.0000  10.00  0.00 
6024+500.00  0.0000  10.00  0.00 
6024+520.00  0.0000  10.00  0.00 
6024+540.00  0.0000  10.00  0.00 
6024+560.00  0.0000  10.00  0.00 
6024+580.00  0.0000  10.00  0.00 
6024+600.00  0.0000  10.00  0.00 
6024+620.00  0.0000  10.00  0.00 
6024+640.00  0.0000  10.00  0.00 
6024+660.00  0.7600  10.00  7.60 
6024+680.00  0.0000  10.00  7.60 
6024+700.00  0.0000  10.00  0.00 
6024+720.00  0.0000  10.00  0.00 
6024+740.00  0.0000  10.00  0.00 
6024+760.00  0.0000  10.00  0.00 
6024+780.00  0.0000  10.00  0.00 
6024+800.00  0.0000  10.00  0.00 
6024+820.00  0.0000  10.00  0.00 
6024+840.00  0.0000  10.00  0.00 
6024+860.00  0.0000  10.00  0.00 
6024+880.00  0.0000  10.00  0.00 
6024+900.00  0.0000  10.00  0.00 
6024+920.00  0.0000  10.00  0.00 
6024+940.00  0.0000  10.00  0.00 
6024+960.00  0.0000  10.00  0.00 
6024+980.00  0.0000  10.00  0.00 
6025+000.00  0.0000  10.00  0.00 
6025+020.00  0.0000  10.00  0.00 
6025+040.00  0.0000  10.00  0.00 
6025+060.00  0.0000  10.00  0.00 
6025+080.00  0.0000  10.00  0.00 
6025+100.00  0.0000  10.00  0.00 
6025+120.00  0.0000  10.00  0.00 
6025+140.00  0.0000  10.00  0.00 
6025+160.00  0.0000  10.00  0.00 
6025+180.00  0.0000  10.00  0.00 
6025+200.00  0.0000  10.00  0.00 
6025+220.00  0.0000  10.00  0.00 
6025+240.00  0.0000  10.00  0.00 
6025+260.00  0.0000  10.00  0.00 
6025+280.00  0.0000  10.00  0.00 
6025+300.00  0.0000  10.00  0.00 

141 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6025+320.00  0.0000  10.00  0.00 
6025+340.00  0.0000  10.00  0.00 
6025+360.00  0.0000  10.00  0.00 
6025+380.00  0.0000  10.00  0.00 
6025+400.00  0.0000  10.00  0.00 
6025+420.00  0.0000  10.00  0.00 
6025+440.00  0.0000  10.00  0.00 
6025+460.00  0.0000  10.00  0.00 
6025+480.00  0.0000  10.00  0.00 
6025+500.00  0.0000  10.00  0.00 
6025+520.00  0.0000  10.00  0.00 
6025+540.00  0.0000  10.00  0.00 
6025+560.00  0.0000  10.00  0.00 
6025+580.00  0.0000  10.00  0.00 
6025+580.00  0.0000  0.00  0.00 
6025+600.00  0.0000  10.00  0.00 
6025+620.00  0.0000  10.00  0.00 
6025+640.00  0.0000  10.00  0.00 
6025+660.00  0.0000  10.00  0.00 
6025+660.00  0.0000  0.00  0.00 
6025+680.00  0.0000  10.00  0.00 
6025+700.00  0.0000  10.00  0.00 
6025+720.00  0.0000  10.00  0.00 
6025+740.00  0.0000  10.00  0.00 
6025+760.00  0.0000  10.00  0.00 
6025+780.00  0.0000  10.00  0.00 
6025+800.00  0.0000  10.00  0.00 
6025+820.00  0.0000  10.00  0.00 
6025+840.00  0.0000  10.00  0.00 
6025+860.00  0.0000  10.00  0.00 
6025+880.00  0.0000  10.00  0.00 
6025+900.00  0.0000  10.00  0.00 
6025+920.00  0.0000  10.00  0.00 
6025+940.00  0.0000  10.00  0.00 
6025+960.00  0.0000  10.00  0.00 
6025+980.00  0.0000  10.00  0.00 
6026+000.00  0.0000  10.00  0.00 
6026+020.00  0.0000  10.00  0.00 
6026+040.00  0.0000  10.00  0.00 
6026+060.00  0.0000  10.00  0.00 
6026+080.00  0.0000  10.00  0.00 
6026+100.00  0.0000  10.00  0.00 
6026+120.00  0.0000  10.00  0.00 
6026+140.00  0.0000  10.00  0.00 
6026+160.00  0.0000  10.00  0.00 
6026+180.00  0.0000  10.00  0.00 
6026+200.00  0.7750  10.00  7.75 
6026+220.00  0.0000  10.00  7.75 

142 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6026+240.00  0.0000  10.00  0.00 
6026+260.00  0.0000  10.00  0.00 
6026+280.00  0.0000  10.00  0.00 
6026+290.99  0.0000  5.49  0.00 
6026+300.00  0.0000  4.51  0.00 
6026+320.00  0.0000  10.00  0.00 
6026+320.99  0.0000  0.49  0.00 
6026+340.00  0.0000  9.51  0.00 
6026+360.00  0.0000  10.00  0.00 
6026+380.00  0.4430  10.00  4.43 
6026+400.00  0.0000  10.00  4.43 
6026+407.71  0.0000  3.85  0.00 
6026+420.00  0.0000  6.15  0.00 
6026+437.71  0.0000  8.85  0.00 
6026+440.00  0.0000  1.15  0.00 
6026+460.00  0.0000  10.00  0.00 
6026+480.00  0.0000  10.00  0.00 
6026+500.00  0.0000  10.00  0.00 
6026+520.00  0.0000  10.00  0.00 
6026+540.00  0.0000  10.00  0.00 
6026+560.00  0.0000  10.00  0.00 
6026+580.00  0.0000  10.00  0.00 
6026+600.00  0.0000  10.00  0.00 
6026+620.00  0.0000  10.00  0.00 
6026+640.00  0.0000  10.00  0.00 
6026+660.00  0.0000  10.00  0.00 
6026+680.00  0.0000  10.00  0.00 
6026+700.00  0.0000  10.00  0.00 
6026+720.00  0.0000  10.00  0.00 
6026+740.00  0.0000  10.00  0.00 
6026+760.00  0.0000  10.00  0.00 
6026+780.00  0.0000  10.00  0.00 
6026+800.00  0.0000  10.00  0.00 
6026+820.00  0.0000  10.00  0.00 
6026+840.00  0.0000  10.00  0.00 
6026+860.00  0.0000  10.00  0.00 
6026+880.00  0.0000  10.00  0.00 
6026+900.00  0.0000  10.00  0.00 
6026+920.00  0.0000  10.00  0.00 
6026+940.00  0.0000  10.00  0.00 
6026+960.00  0.0000  10.00  0.00 
6026+980.00  0.0000  10.00  0.00 
6027+000.00  0.0000  10.00  0.00 
6027+020.00  0.0000  10.00  0.00 
6027+040.00  0.0000  10.00  0.00 
6027+060.00  0.0000  10.00  0.00 
6027+080.00  0.0000  10.00  0.00 
6027+100.00  0.0000  10.00  0.00 

143 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6027+120.00  0.0000  10.00  0.00 
6027+140.00  0.0000  10.00  0.00 
6027+160.00  0.0000  10.00  0.00 
6027+180.00  0.8610  10.00  8.61 
6027+200.00  0.0000  10.00  8.61 
6027+220.00  0.0000  10.00  0.00 
6027+240.00  0.0000  10.00  0.00 
6027+260.00  0.0000  10.00  0.00 
6027+280.00  0.0000  10.00  0.00 
6027+300.00  0.0000  10.00  0.00 
6027+320.00  0.0000  10.00  0.00 
6027+340.00  0.0000  10.00  0.00 
6027+360.00  2.5230  10.00  25.23 
6027+380.00  4.6760  10.00  71.99 
6027+400.00  0.0000  10.00  46.76 
6027+420.00  0.0000  10.00  0.00 
6027+440.00  0.0000  10.00  0.00 
6027+460.00  0.0000  10.00  0.00 
6027+480.00  0.0000  10.00  0.00 
6027+500.00  0.0000  10.00  0.00 
6027+520.00  0.0000  10.00  0.00 
6027+540.00  0.0000  10.00  0.00 
6027+560.00  0.0000  10.00  0.00 
6027+565.00  0.0000  2.50  0.00 
6027+565.00  0.0000  0.00  0.00 
6027+580.00  0.0000  7.50  0.00 
6027+600.00  0.0000  10.00  0.00 
6027+620.00  0.0000  10.00  0.00 
6027+640.00  0.0000  10.00  0.00 
6027+660.00  0.0000  10.00  0.00 
6027+680.00  0.0000  10.00  0.00 
6027+700.00  0.0000  10.00  0.00 
6027+720.00  0.0000  10.00  0.00 
6027+740.00  0.0000  10.00  0.00 
6027+760.00  0.0000  10.00  0.00 
6027+780.00  0.0000  10.00  0.00 
6027+800.00  0.0000  10.00  0.00 
6027+820.00  0.0000  10.00  0.00 
6027+840.00  0.0000  10.00  0.00 
6027+860.00  0.0000  10.00  0.00 
6027+880.00  0.0000  10.00  0.00 
6027+900.00  0.0000  10.00  0.00 
6027+920.00  0.0000  10.00  0.00 
6027+940.00  0.0000  10.00  0.00 
6027+960.00  0.0000  10.00  0.00 
6027+980.00  0.0000  10.00  0.00 
6027+990.00  0.0000  5.00  0.00 
6027+990.00  0.0000  0.00  0.00 

144 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6028+000.00  0.0000  5.00  0.00 
6028+000.00  0.0000  0.00  0.00 
6028+020.00  0.0000  10.00  0.00 
6028+040.00  1.4840  10.00  14.84 
6028+060.00  0.0000  10.00  14.84 
6028+080.00  0.0000  10.00  0.00 
6028+100.00  0.0000  10.00  0.00 
6028+120.00  0.0000  10.00  0.00 
6028+140.00  0.0000  10.00  0.00 
6028+140.00  0.0000  0.00  0.00 
6028+160.00  0.0000  10.00  0.00 
6028+180.00  0.0000  10.00  0.00 
6028+200.00  0.0000  10.00  0.00 
6028+220.00  0.0000  10.00  0.00 
6028+240.00  0.0000  10.00  0.00 
6028+260.00  0.0000  10.00  0.00 
6028+280.00  0.0000  10.00  0.00 
6028+300.00  0.0000  10.00  0.00 
6028+320.00  0.0000  10.00  0.00 
6028+340.00  0.0000  10.00  0.00 
6028+360.00  0.0000  10.00  0.00 
6028+380.00  0.0000  10.00  0.00 
6028+400.00  0.0000  10.00  0.00 
6028+420.00  0.0000  10.00  0.00 
6028+440.00  0.0000  10.00  0.00 
6028+460.00  0.0000  10.00  0.00 
6028+480.00  0.0000  10.00  0.00 
6028+500.00  0.0000  10.00  0.00 
6028+520.00  0.0000  10.00  0.00 
6028+540.00  0.0000  10.00  0.00 
6028+560.00  0.0000  10.00  0.00 
6028+580.00  0.0000  10.00  0.00 
6028+600.00  0.0000  10.00  0.00 
6028+620.00  0.0000  10.00  0.00 
6028+640.00  0.0000  10.00  0.00 
6028+660.00  0.0000  10.00  0.00 
6028+680.00  0.0000  10.00  0.00 
6028+700.00  0.0000  10.00  0.00 
6028+720.00  0.0000  10.00  0.00 
6028+740.00  0.0000  10.00  0.00 
6028+760.00  0.0000  10.00  0.00 
6028+780.00  0.0000  10.00  0.00 
6028+800.00  0.0000  10.00  0.00 
6028+820.00  0.0000  10.00  0.00 
6028+840.00  0.0000  10.00  0.00 
6028+860.00  0.0000  10.00  0.00 
6028+880.00  0.0000  10.00  0.00 
6028+900.00  0.0000  10.00  0.00 

145 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6028+920.00  0.0000  10.00  0.00 
6028+940.00  0.0000  10.00  0.00 
6028+960.00  0.0000  10.00  0.00 
6028+980.00  0.0000  10.00  0.00 
6029+000.00  0.0000  10.00  0.00 
6029+020.00  0.0000  10.00  0.00 
6029+040.00  0.0000  10.00  0.00 
6029+060.00  0.0000  10.00  0.00 
6029+080.00  0.0000  10.00  0.00 
6029+100.00  0.0000  10.00  0.00 
6029+120.00  0.0000  10.00  0.00 
6029+140.00  0.0000  10.00  0.00 
6029+160.00  0.0000  10.00  0.00 
6029+180.00  0.0000  10.00  0.00 
6029+200.00  0.0000  10.00  0.00 
6029+220.00  0.0000  10.00  0.00 
6029+240.00  0.0000  10.00  0.00 
6029+255.00  0.0000  7.50  0.00 
6029+255.00  0.0000  0.00  0.00 
6029+260.00  0.0000  2.50  0.00 
6029+280.00  0.0000  10.00  0.00 
6029+300.00  0.0000  10.00  0.00 
6029+320.00  0.0000  10.00  0.00 
6029+340.00  0.0000  10.00  0.00 
6029+340.00  0.0000  0.00  0.00 
6029+360.00  0.0000  10.00  0.00 
6029+380.00  0.0000  10.00  0.00 
6029+400.00  0.0000  10.00  0.00 
6029+420.00  0.0000  10.00  0.00 
6029+440.00  0.0000  10.00  0.00 
6029+449.97  0.0000  4.98  0.00 
6029+460.00  0.0000  5.02  0.00 
6029+480.00  0.0000  10.00  0.00 
6029+500.00  0.0000  10.00  0.00 
6029+520.00  0.0000  10.00  0.00 
6029+540.00  0.0000  10.00  0.00 
6029+560.00  0.0000  10.00  0.00 
6029+580.00  0.0000  10.00  0.00 
6029+599.97  0.0000  9.98  0.00 
6029+600.00  0.0000  0.02  0.00 
6029+620.00  0.0000  10.00  0.00 
6029+620.00  0.0000  0.00  0.00 
6029+640.00  0.0000  10.00  0.00 
6029+660.00  0.0000  10.00  0.00 
6029+680.00  0.0000  10.00  0.00 
6029+700.00  0.0000  10.00  0.00 
6029+720.00  0.0000  10.00  0.00 
6029+740.00  0.0000  10.00  0.00 

146 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6029+760.00  0.0000  10.00  0.00 
6029+780.00  0.0000  10.00  0.00 
6029+800.00  0.0000  10.00  0.00 
6029+820.00  0.0000  10.00  0.00 
6029+840.00  0.0000  10.00  0.00 
6029+860.00  0.0000  10.00  0.00 
6029+880.00  0.0000  10.00  0.00 
6029+900.00  0.0000  10.00  0.00 
6029+920.00  0.0000  10.00  0.00 
6029+940.00  0.0000  10.00  0.00 
6029+960.00  0.0000  10.00  0.00 
6029+980.00  0.0000  10.00  0.00 
6030+000.00  0.0000  10.00  0.00 
 

TABLA 20 VOLUMEN DE CORTE PARA EL TRAMO DEL 6036+800– 6067+000 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6036+800.00  0.0000       
6036+820.00  0.0000  10.00  0.00 
6036+840.00  0.0000  10.00  0.00 
6036+860.00  0.0000  10.00  0.00 
6036+880.00  0.0000  10.00  0.00 
6036+900.00  0.0000  10.00  0.00 
6036+920.00  0.0000  10.00  0.00 
6036+940.00  0.0000  10.00  0.00 
6036+960.00  0.0000  10.00  0.00 
6036+980.00  0.0000  10.00  0.00 
6036+992.12  0.0000  6.06  0.00 
6037+000.00  0.0000  3.94  0.00 
6037+020.00  0.0000  10.00  0.00 
6037+040.00  0.0000  10.00  0.00 
6037+060.00  0.0000  10.00  0.00 
6037+080.00  0.0000  10.00  0.00 
6037+100.00  0.0000  10.00  0.00 
6037+120.00  0.0000  10.00  0.00 
6037+140.00  0.0000  10.00  0.00 
6037+142.12  0.0000  1.06  0.00 
6037+160.00  0.0000  8.94  0.00 
6037+180.00  0.0000  10.00  0.00 
6037+200.00  0.0000  10.00  0.00 
6037+220.00  0.0000  10.00  0.00 
6037+240.00  0.0000  10.00  0.00 
6037+260.00  0.0000  10.00  0.00 
6037+280.00  0.0000  10.00  0.00 
6037+300.00  0.0000  10.00  0.00 
6037+316.55  0.0000  8.28  0.00 

147 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6037+320.00  0.0000  1.72  0.00 
6037+340.00  1.2290  10.00  12.29 
6037+360.00  0.0000  10.00  12.29 
6037+380.00  0.0000  10.00  0.00 
6037+400.00  0.0000  10.00  0.00 
6037+420.00  0.0000  10.00  0.00 
6037+440.00  0.0000  10.00  0.00 
6037+460.00  0.0000  10.00  0.00 
6037+466.55  0.0000  3.28  0.00 
6037+480.00  0.0000  6.72  0.00 
6037+500.00  0.0000  10.00  0.00 
6037+520.00  4.6710  10.00  46.71 
6037+540.00  0.0000  10.00  46.71 
6037+560.00  0.0000  10.00  0.00 
6037+580.00  0.0000  10.00  0.00 
6037+600.00  0.0000  10.00  0.00 
6037+620.00  0.0000  10.00  0.00 
6037+640.00  0.0000  10.00  0.00 
6037+660.00  0.0000  10.00  0.00 
6037+680.00  0.0000  10.00  0.00 
6037+700.00  0.0000  10.00  0.00 
6037+720.00  1.4190  10.00  14.19 
6037+740.00  0.0000  10.00  14.19 
6037+760.00  0.0000  10.00  0.00 
6037+780.00  0.7160  10.00  7.16 
6037+800.00  0.0000  10.00  7.16 
6037+820.00  0.0000  10.00  0.00 
6037+840.00  0.0000  10.00  0.00 
6037+860.00  0.0000  10.00  0.00 
6037+880.00  0.0000  10.00  0.00 
6037+900.00  0.3220  10.00  3.22 
6037+920.00  0.7470  10.00  10.69 
6037+940.00  0.0000  10.00  7.47 
6037+960.00  0.0000  10.00  0.00 
6037+980.00  0.0000  10.00  0.00 
6038+000.00  0.0000  10.00  0.00 
6038+020.00  0.0000  10.00  0.00 
6038+040.00  0.0000  10.00  0.00 
6038+060.00  0.0000  10.00  0.00 
6038+080.00  0.0000  10.00  0.00 
6038+100.00  0.0000  10.00  0.00 
6038+120.00  0.6600  10.00  6.60 
6038+140.00  0.4720  10.00  11.32 
6038+160.00  0.0000  10.00  4.72 
6038+180.00  0.0000  10.00  0.00 
6038+200.00  2.3180  10.00  23.18 
6038+220.00  13.6560  10.00  159.74 
6038+240.00  4.0860  10.00  177.42 

148 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6038+260.00  0.0000  10.00  40.86 
6038+280.00  0.0000  10.00  0.00 
6038+300.00  0.0000  10.00  0.00 
6038+320.00  0.0000  10.00  0.00 
6038+340.00  0.0000  10.00  0.00 
6038+360.00  0.0000  10.00  0.00 
6038+380.00  0.0000  10.00  0.00 
6038+400.00  2.0040  10.00  20.04 
6038+420.00  0.0000  10.00  20.04 
6038+440.00  1.0780  10.00  10.78 
6038+460.00  0.0000  10.00  10.78 
6038+480.00  0.0000  10.00  0.00 
6038+500.00  0.0000  10.00  0.00 
6038+520.00  0.0000  10.00  0.00 
6038+540.00  0.0000  10.00  0.00 
6038+560.00  0.0000  10.00  0.00 
6038+580.00  0.4520  10.00  4.52 
6038+600.00  0.0000  10.00  4.52 
6038+620.00  0.0000  10.00  0.00 
6038+640.00  0.0000  10.00  0.00 
6038+660.00  0.0000  10.00  0.00 
6038+680.00  0.0000  10.00  0.00 
6038+700.00  0.0000  10.00  0.00 
6038+720.00  0.0000  10.00  0.00 
6038+740.00  0.0000  10.00  0.00 
6038+760.00  0.0000  10.00  0.00 
6038+780.00  0.0000  10.00  0.00 
6038+800.00  0.0000  10.00  0.00 
6038+820.00  0.0000  10.00  0.00 
6038+840.00  0.8760  10.00  8.76 
6038+860.00  1.3970  10.00  22.73 
6038+880.00  0.6470  10.00  20.44 
6038+900.00  0.0000  10.00  6.47 
6038+920.00  0.0000  10.00  0.00 
6038+940.00  0.0000  10.00  0.00 
6038+960.00  0.0000  10.00  0.00 
6038+980.00  0.0000  10.00  0.00 
6039+000.00  0.0000  10.00  0.00 
6039+020.00  0.0000  10.00  0.00 
6039+040.00  0.0000  10.00  0.00 
6039+060.00  0.0000  10.00  0.00 
6039+080.00  0.0000  10.00  0.00 
6039+100.00  0.0000  10.00  0.00 
6039+120.00  0.0000  10.00  0.00 
6039+140.00  0.0000  10.00  0.00 
6039+160.00  0.0000  10.00  0.00 
6039+180.00  0.0000  10.00  0.00 
6039+200.00  0.0000  10.00  0.00 

149 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6039+220.00  0.0000  10.00  0.00 
6039+240.00  0.0000  10.00  0.00 
6039+260.00  0.0000  10.00  0.00 
6039+280.00  0.0000  10.00  0.00 
6039+300.00  0.0000  10.00  0.00 
6039+320.00  0.0000  10.00  0.00 
6039+340.00  0.0000  10.00  0.00 
6039+360.00  0.0000  10.00  0.00 
6039+380.00  0.0000  10.00  0.00 
6039+400.00  0.0000  10.00  0.00 
6039+420.00  1.8530  10.00  18.53 
6039+440.00  0.0000  10.00  18.53 
6039+460.00  0.0000  10.00  0.00 
6039+480.00  0.0000  10.00  0.00 
6039+500.00  0.0000  10.00  0.00 
6039+520.00  0.0000  10.00  0.00 
6039+540.00  0.0000  10.00  0.00 
6039+560.00  0.0000  10.00  0.00 
6039+580.00  0.0000  10.00  0.00 
6039+600.00  0.0000  10.00  0.00 
6039+620.00  0.4500  10.00  4.50 
6039+640.00  10.0160  10.00  104.66 
6039+660.00  1.3590  10.00  113.75 
6039+680.00  0.0000  10.00  13.59 
6039+700.00  0.0000  10.00  0.00 
6039+720.00  0.0000  10.00  0.00 
6039+722.65  0.0000  1.33  0.00 
6039+730.00  0.0000  3.67  0.00 
6039+740.00  0.0000  5.00  0.00 
6039+742.65  0.0000  1.33  0.00 
6039+750.00  0.0000  3.67  0.00 
6039+760.00  0.0000  5.00  0.00 
6039+770.00  0.0000  5.00  0.00 
6039+780.00  0.0000  5.00  0.00 
6039+790.00  0.0000  5.00  0.00 
6039+800.00  0.0000  5.00  0.00 
6039+810.00  0.0000  5.00  0.00 
6039+820.00  0.0000  5.00  0.00 
6039+830.00  0.0000  5.00  0.00 
6039+840.00  0.0000  5.00  0.00 
6039+850.00  0.0000  5.00  0.00 
6039+860.00  0.0000  5.00  0.00 
6039+870.00  0.0000  5.00  0.00 
6039+880.00  0.0000  5.00  0.00 
6039+890.00  0.0000  5.00  0.00 
6039+900.00  0.0000  5.00  0.00 
6039+910.00  0.0000  5.00  0.00 
6039+920.00  0.0000  5.00  0.00 

150 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6039+940.00  0.0000  10.00  0.00 
6039+960.00  0.0000  10.00  0.00 
6039+980.00  0.0000  10.00  0.00 
6040+000.00  0.0000  10.00  0.00 
6040+020.00  0.0000  10.00  0.00 
6040+040.00  0.0000  10.00  0.00 
6040+060.00  0.0000  10.00  0.00 
6040+080.00  0.5670  10.00  5.67 
6040+100.00  5.0980  10.00  56.65 
6040+120.00  2.4220  10.00  75.20 
6040+140.00  1.5140  10.00  39.36 
6040+160.00  0.0000  10.00  15.14 
6040+180.00  0.0000  10.00  0.00 
6040+200.00  0.0000  10.00  0.00 
6040+220.00  0.0000  10.00  0.00 
6040+240.00  0.0000  10.00  0.00 
6040+260.00  0.0000  10.00  0.00 
6040+280.00  0.0000  10.00  0.00 
6040+300.00  0.0000  10.00  0.00 
6040+320.00  0.0000  10.00  0.00 
6040+333.37  0.0000  6.69  0.00 
6040+340.00  0.0000  3.31  0.00 
6040+360.00  0.0000  10.00  0.00 
6040+380.00  0.0000  10.00  0.00 
6040+400.00  0.0000  10.00  0.00 
6040+420.00  0.0000  10.00  0.00 
6040+440.00  0.0000  10.00  0.00 
6040+460.00  0.0000  10.00  0.00 
6040+480.00  0.0000  10.00  0.00 
6040+483.37  0.0000  1.69  0.00 
6040+500.00  0.0000  8.31  0.00 
6040+520.00  0.0000  10.00  0.00 
6040+540.00  0.0000  10.00  0.00 
6040+560.00  0.0000  10.00  0.00 
6040+580.00  0.0000  10.00  0.00 
6040+600.00  0.0000  10.00  0.00 
6040+620.00  0.0000  10.00  0.00 
6040+640.00  0.0000  10.00  0.00 
6040+660.00  0.0000  10.00  0.00 
6040+680.00  0.0000  10.00  0.00 
6040+700.00  0.0000  10.00  0.00 
6040+720.00  0.0000  10.00  0.00 
6040+740.00  0.0000  10.00  0.00 
6040+760.00  0.0000  10.00  0.00 
6040+780.00  0.0000  10.00  0.00 
6040+781.48  0.0000  0.74  0.00 
6040+800.00  0.0000  9.26  0.00 
6040+820.00  0.0000  10.00  0.00 

151 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6040+840.00  0.0000  10.00  0.00 
6040+860.00  0.0000  10.00  0.00 
6040+880.00  0.0000  10.00  0.00 
6040+900.00  0.0000  10.00  0.00 
6040+920.00  0.0000  10.00  0.00 
6040+931.48  0.0000  5.74  0.00 
6040+940.00  0.0000  4.26  0.00 
6040+960.00  0.0000  10.00  0.00 
6040+980.00  0.0000  10.00  0.00 
6041+000.00  0.0000  10.00  0.00 
6041+020.00  0.0000  10.00  0.00 
6041+040.00  0.0000  10.00  0.00 
6041+060.00  0.0000  10.00  0.00 
6041+080.00  0.0000  10.00  0.00 
6041+100.00  0.0000  10.00  0.00 
6041+120.00  0.0000  10.00  0.00 
6041+140.00  0.0000  10.00  0.00 
6041+160.00  0.0000  10.00  0.00 
6041+180.00  0.0000  10.00  0.00 
6041+200.00  0.0000  10.00  0.00 
6041+220.00  0.0000  10.00  0.00 
6041+240.00  0.0000  10.00  0.00 
6041+260.00  0.0000  10.00  0.00 
6041+280.00  0.0000  10.00  0.00 
6041+300.00  0.0000  10.00  0.00 
6041+320.00  0.0000  10.00  0.00 
6041+340.00  0.0000  10.00  0.00 
6041+360.00  0.0000  10.00  0.00 
6041+380.00  0.0000  10.00  0.00 
6041+390.00  0.0000  5.00  0.00 
6041+400.00  0.0000  5.00  0.00 
6041+410.00  0.0000  5.00  0.00 
6041+420.00  0.0000  5.00  0.00 
6041+430.00  0.0000  5.00  0.00 
6041+440.00  0.0000  5.00  0.00 
6041+450.00  0.0000  5.00  0.00 
6041+460.00  0.0000  5.00  0.00 
6041+470.00  0.0000  5.00  0.00 
6041+480.00  0.0000  5.00  0.00 
6041+490.00  0.0000  5.00  0.00 
6041+500.00  0.0000  5.00  0.00 
6041+510.00  0.0000  5.00  0.00 
6041+520.00  0.0000  5.00  0.00 
6041+530.00  0.0000  5.00  0.00 
6041+540.00  0.0000  5.00  0.00 
6041+550.00  0.0000  5.00  0.00 
6041+560.00  0.0000  5.00  0.00 
6041+564.54  0.0000  2.27  0.00 

152 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6041+570.00  0.0000  2.73  0.00 
6041+580.00  0.0000  5.00  0.00 
6041+584.54  0.0000  2.27  0.00 
6041+600.00  0.0000  7.73  0.00 
6041+620.00  0.0000  10.00  0.00 
6041+640.00  0.0000  10.00  0.00 
6041+660.00  0.0000  10.00  0.00 
6041+680.00  0.0000  10.00  0.00 
6041+700.00  0.0000  10.00  0.00 
6041+720.00  0.0000  10.00  0.00 
6041+740.00  0.0000  10.00  0.00 
6041+760.00  0.0000  10.00  0.00 
6041+780.00  0.0000  10.00  0.00 
6041+800.00  0.0000  10.00  0.00 
6041+820.00  0.0000  10.00  0.00 
6041+840.00  0.0000  10.00  0.00 
6041+860.00  0.0000  10.00  0.00 
6041+880.00  0.0000  10.00  0.00 
6041+900.00  0.0000  10.00  0.00 
6041+920.00  0.0000  10.00  0.00 
6041+940.00  0.0000  10.00  0.00 
6041+960.00  0.0000  10.00  0.00 
6041+980.00  0.4870  10.00  4.87 
6042+000.00  0.0000  10.00  4.87 
6042+020.00  0.0000  10.00  0.00 
6042+040.00  0.0000  10.00  0.00 
6042+060.00  0.5720  10.00  5.72 
6042+080.00  0.0000  10.00  5.72 
6042+100.00  0.0000  10.00  0.00 
6042+120.00  0.0000  10.00  0.00 
6042+140.00  1.3680  10.00  13.68 
6042+160.00  10.5830  10.00  119.51 
6042+180.00  18.2450  10.00  288.28 
6042+200.00  5.1350  10.00  233.80 
6042+220.00  0.0000  10.00  51.35 
6042+240.00  0.0000  10.00  0.00 
6042+260.00  0.0000  10.00  0.00 
6042+280.00  0.0000  10.00  0.00 
6042+300.00  0.0000  10.00  0.00 
6042+320.00  0.0000  10.00  0.00 
6042+340.00  1.6810  10.00  16.81 
6042+360.00  0.8180  10.00  24.99 
6042+380.00  0.0000  10.00  8.18 
6042+400.00  0.0000  10.00  0.00 
6042+420.00  0.0000  10.00  0.00 
6042+440.00  0.0000  10.00  0.00 
6042+460.00  0.0000  10.00  0.00 
6042+480.00  0.0000  10.00  0.00 

153 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6042+500.00  0.0000  10.00  0.00 
6042+520.00  0.0000  10.00  0.00 
6042+540.00  0.0000  10.00  0.00 
6042+560.00  0.0000  10.00  0.00 
6042+580.00  0.0000  10.00  0.00 
6042+600.00  0.0000  10.00  0.00 
6042+620.00  0.0000  10.00  0.00 
6042+640.00  0.0000  10.00  0.00 
6042+660.00  0.0000  10.00  0.00 
6042+680.00  0.0000  10.00  0.00 
6042+700.00  0.0000  10.00  0.00 
6042+720.00  0.0000  10.00  0.00 
6042+740.00  0.0000  10.00  0.00 
6042+760.00  0.0000  10.00  0.00 
6042+780.00  0.0000  10.00  0.00 
6042+800.00  0.0000  10.00  0.00 
6042+820.00  0.0000  10.00  0.00 
6042+840.00  0.0000  10.00  0.00 
6042+860.00  0.0000  10.00  0.00 
6042+880.00  0.0000  10.00  0.00 
6042+900.00  0.0000  10.00  0.00 
6042+920.00  0.0000  10.00  0.00 
6042+940.00  0.0000  10.00  0.00 
6042+960.00  0.0000  10.00  0.00 
6042+980.00  0.0000  10.00  0.00 
6043+000.00  0.0000  10.00  0.00 
6043+020.00  0.3440  10.00  3.44 
6043+040.00  1.9560  10.00  23.00 
6043+060.00  0.0000  10.00  19.56 
6043+080.00  0.0000  10.00  0.00 
6043+100.00  0.0000  10.00  0.00 
6043+120.00  0.0000  10.00  0.00 
6043+140.00  0.0000  10.00  0.00 
6043+160.00  0.0000  10.00  0.00 
6043+180.00  0.0000  10.00  0.00 
6043+200.00  0.0000  10.00  0.00 
6043+220.00  0.0000  10.00  0.00 
6043+240.00  0.0000  10.00  0.00 
6043+260.00  0.0000  10.00  0.00 
6043+280.00  0.0000  10.00  0.00 
6043+300.00  0.0000  10.00  0.00 
6043+320.00  0.0000  10.00  0.00 
6043+340.00  0.0000  10.00  0.00 
6043+360.00  0.0000  10.00  0.00 
6043+380.00  0.0000  10.00  0.00 
6043+400.00  0.0000  10.00  0.00 
6043+420.00  0.0000  10.00  0.00 
6043+440.00  0.0000  10.00  0.00 

154 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6043+460.00  0.0000  10.00  0.00 
6043+480.00  0.0000  10.00  0.00 
6043+500.00  0.0000  10.00  0.00 
6043+520.00  0.0000  10.00  0.00 
6043+540.00  0.0000  10.00  0.00 
6043+560.00  0.0000  10.00  0.00 
6043+580.00  0.0000  10.00  0.00 
6043+600.00  0.0000  10.00  0.00 
6043+620.00  0.0000  10.00  0.00 
6043+640.00  0.0000  10.00  0.00 
6043+660.00  0.0000  10.00  0.00 
6043+680.00  0.0000  10.00  0.00 
6043+700.00  1.3170  10.00  13.17 
6043+720.00  0.0000  10.00  13.17 
6043+740.00  0.0000  10.00  0.00 
6043+760.00  0.0000  10.00  0.00 
6043+780.00  0.0000  10.00  0.00 
6043+800.00  0.0000  10.00  0.00 
6043+820.00  0.0000  10.00  0.00 
6043+840.00  0.0000  10.00  0.00 
6043+860.00  0.0000  10.00  0.00 
6043+880.00  0.0000  10.00  0.00 
6043+900.00  0.0000  10.00  0.00 
6043+920.00  0.0000  10.00  0.00 
6043+940.00  0.0000  10.00  0.00 
6043+960.00  0.0000  10.00  0.00 
6043+980.00  0.0000  10.00  0.00 
6044+000.00  0.0000  10.00  0.00 
6044+020.00  0.0000  10.00  0.00 
6044+040.00  0.0000  10.00  0.00 
6044+060.00  0.0000  10.00  0.00 
6044+080.00  0.0000  10.00  0.00 
6044+100.00  0.0000  10.00  0.00 
6044+120.00  0.0000  10.00  0.00 
6044+140.00  0.0000  10.00  0.00 
6044+160.00  0.0000  10.00  0.00 
6044+180.00  0.0000  10.00  0.00 
6044+185.00  0.0000  2.50  0.00 
6044+185.00  0.0000  0.00  0.00 
6044+200.00  0.0000  7.50  0.00 
6044+220.00  0.0000  10.00  0.00 
6044+240.00  0.0000  10.00  0.00 
6044+260.00  0.0000  10.00  0.00 
6044+280.00  0.0000  10.00  0.00 
6044+300.00  0.0000  10.00  0.00 
6044+320.00  0.0000  10.00  0.00 
6044+320.00  0.0000  0.00  0.00 
6044+340.00  0.0000  10.00  0.00 

155 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6044+360.00  0.0000  10.00  0.00 
6044+370.00  0.0000  5.00  0.00 
6044+380.00  0.0000  5.00  0.00 
6044+400.00  0.0020  10.00  0.02 
6044+420.00  0.0000  10.00  0.02 
6044+440.00  0.0000  10.00  0.00 
6044+460.00  0.0010  10.00  0.01 
6044+480.00  0.0010  10.00  0.02 
6044+500.00  0.0000  10.00  0.01 
6044+520.00  0.0000  10.00  0.00 
6044+540.00  0.0000  10.00  0.00 
6044+560.00  0.0000  10.00  0.00 
6044+580.00  0.0000  10.00  0.00 
6044+600.00  0.0010  10.00  0.01 
6044+620.00  0.0000  10.00  0.01 
6044+640.00  0.0000  10.00  0.00 
6044+660.00  0.0020  10.00  0.02 
6044+680.00  0.0010  10.00  0.03 
6044+700.00  0.0010  10.00  0.02 
6044+720.00  0.0000  10.00  0.01 
6044+740.00  0.0000  10.00  0.00 
6044+760.00  0.0000  10.00  0.00 
6044+780.00  0.0010  10.00  0.01 
6044+800.00  0.0030  10.00  0.04 
6044+820.00  0.0000  10.00  0.03 
6044+840.00  0.0000  10.00  0.00 
6044+860.00  0.0000  10.00  0.00 
6044+880.00  0.0020  10.00  0.02 
6044+900.00  0.0010  10.00  0.03 
6044+920.00  0.0000  10.00  0.01 
6044+940.00  0.0000  10.00  0.00 
6044+960.00  0.0000  10.00  0.00 
6044+980.00  0.0000  10.00  0.00 
6045+000.00  0.0020  10.00  0.02 
6045+020.00  0.0000  10.00  0.02 
6045+040.00  0.0000  10.00  0.00 
6045+060.00  0.0000  10.00  0.00 
6045+080.00  0.0000  10.00  0.00 
6045+100.00  0.0010  10.00  0.01 
6045+120.00  0.0000  10.00  0.01 
6045+140.00  0.0000  10.00  0.00 
6045+160.00  0.0010  10.00  0.01 
6045+180.00  0.0000  10.00  0.01 
6045+200.00  0.0000  10.00  0.00 
6045+220.00  0.0000  10.00  0.00 
6045+240.00  0.0010  10.00  0.01 
6045+260.00  0.0010  10.00  0.02 
6045+280.00  0.0000  10.00  0.01 

156 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6045+300.00  0.0000  10.00  0.00 
6045+320.00  0.0010  10.00  0.01 
6045+340.00  0.0000  10.00  0.01 
6045+360.00  0.0010  10.00  0.01 
6045+380.00  0.0000  10.00  0.01 
6045+400.00  0.0000  10.00  0.00 
6045+420.00  0.0010  10.00  0.01 
6045+440.00  0.0000  10.00  0.01 
6045+460.00  0.0000  10.00  0.00 
6045+480.00  0.0000  10.00  0.00 
6045+500.00  0.0000  10.00  0.00 
6045+520.00  0.0000  10.00  0.00 
6045+540.00  0.0000  10.00  0.00 
6045+560.00  0.0010  10.00  0.01 
6045+580.00  0.0000  10.00  0.01 
6045+600.00  0.0000  10.00  0.00 
6045+620.00  0.0010  10.00  0.01 
6045+640.00  0.0000  10.00  0.01 
6045+660.00  0.0000  10.00  0.00 
6045+680.00  0.0000  10.00  0.00 
6045+700.00  0.0000  10.00  0.00 
6045+720.00  0.0010  10.00  0.01 
6045+740.00  0.0000  10.00  0.01 
6045+760.00  0.0010  10.00  0.01 
6045+780.00  0.0000  10.00  0.01 
6045+800.00  0.0010  10.00  0.01 
6045+820.00  0.0000  10.00  0.01 
6045+840.00  0.0000  10.00  0.00 
6045+860.00  0.0020  10.00  0.02 
6045+880.00  0.0000  10.00  0.02 
6045+900.00  0.0010  10.00  0.01 
6045+920.00  0.0000  10.00  0.01 
6045+940.00  0.0010  10.00  0.01 
6045+960.00  0.0000  10.00  0.01 
6045+980.00  0.0010  10.00  0.01 
6046+000.00  0.0010  10.00  0.02 
6046+020.00  0.0000  10.00  0.01 
6046+040.00  0.0000  10.00  0.00 
6046+060.00  0.0010  10.00  0.01 
6046+080.00  0.0000  10.00  0.01 
6046+100.00  0.0010  10.00  0.01 
6046+120.00  0.0000  10.00  0.01 
6046+140.00  0.0010  10.00  0.01 
6046+160.00  0.0000  10.00  0.01 
6046+180.00  0.0000  10.00  0.00 
6046+200.00  0.0010  10.00  0.01 
6046+220.00  0.0020  10.00  0.03 
6046+240.00  0.0000  10.00  0.02 

157 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6046+260.00  0.0000  10.00  0.00 
6046+280.00  0.0000  10.00  0.00 
6046+300.00  0.0010  10.00  0.01 
6046+320.00  0.0000  10.00  0.01 
6046+340.00  0.0000  10.00  0.00 
6046+360.00  0.0010  10.00  0.01 
6046+380.00  0.0000  10.00  0.01 
6046+400.00  0.0010  10.00  0.01 
6046+420.00  0.0000  10.00  0.01 
6046+440.00  0.0010  10.00  0.01 
6046+460.00  0.0020  10.00  0.03 
6046+480.00  0.0000  10.00  0.02 
6046+500.00  0.0000  10.00  0.00 
6046+520.00  0.0020  10.00  0.02 
6046+540.00  0.0000  10.00  0.02 
6046+560.00  0.0010  10.00  0.01 
6046+580.00  0.0000  10.00  0.01 
6046+600.00  0.0010  10.00  0.01 
6046+620.00  0.0000  10.00  0.01 
6046+640.00  0.0010  10.00  0.01 
6046+660.00  0.0010  10.00  0.02 
6046+680.00  0.0000  10.00  0.01 
6046+700.00  0.0010  10.00  0.01 
6046+720.00  0.0000  10.00  0.01 
6046+740.00  0.0000  10.00  0.00 
6046+760.00  0.0000  10.00  0.00 
6046+780.00  0.0010  10.00  0.01 
6046+800.00  0.0010  10.00  0.02 
6046+820.00  0.0000  10.00  0.01 
6046+840.00  0.0000  10.00  0.00 
6046+860.00  0.2760  10.00  2.76 
6046+880.00  0.0000  10.00  2.76 
6046+900.00  0.0000  10.00  0.00 
6046+920.00  0.0000  10.00  0.00 
6046+940.00  0.0000  10.00  0.00 
6046+960.00  0.0000  10.00  0.00 
6046+980.00  0.0000  10.00  0.00 
6047+000.00  0.0000  10.00  0.00 
6047+000.00  0.0000  0.00  0.00 
6047+020.00  0.0000  10.00  0.00 
6047+040.00  0.0000  10.00  0.00 
6047+060.00  0.0000  10.00  0.00 
6047+060.00  0.0000  0.00  0.00 
6047+080.00  0.0000  10.00  0.00 
6047+100.00  0.0000  10.00  0.00 
6047+120.00  0.0000  10.00  0.00 
6047+140.00  0.0000  10.00  0.00 
6047+160.00  0.0000  10.00  0.00 

158 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6047+180.00  0.0000  10.00  0.00 
6047+200.00  0.0000  10.00  0.00 
6047+220.00  0.0000  10.00  0.00 
6047+240.00  0.0000  10.00  0.00 
6047+260.00  0.0000  10.00  0.00 
6047+280.00  0.0000  10.00  0.00 
6047+300.00  0.0000  10.00  0.00 
6047+320.00  0.0000  10.00  0.00 
6047+340.00  0.0000  10.00  0.00 
6047+360.00  0.0000  10.00  0.00 
6047+380.00  0.0000  10.00  0.00 
6047+400.00  0.0000  10.00  0.00 
6047+420.00  0.0000  10.00  0.00 
6047+440.00  0.0000  10.00  0.00 
6047+460.00  0.0000  10.00  0.00 
6047+480.00  0.0000  10.00  0.00 
6047+500.00  0.0000  10.00  0.00 
6047+510.00  0.0000  5.00  0.00 
6047+510.00  0.0000  0.00  0.00 
6047+520.00  0.0000  5.00  0.00 
6047+540.00  0.0000  10.00  0.00 
6047+560.00  0.0000  10.00  0.00 
6047+580.00  0.0000  10.00  0.00 
6047+580.00  0.0000  0.00  0.00 
6047+600.00  0.0000  10.00  0.00 
6047+620.00  0.6890  10.00  6.89 
6047+640.00  0.0000  10.00  6.89 
6047+660.00  0.0000  10.00  0.00 
6047+680.00  0.0000  10.00  0.00 
6047+700.00  0.0000  10.00  0.00 
6047+720.00  0.0000  10.00  0.00 
6047+740.00  0.0000  10.00  0.00 
6047+760.00  0.0000  10.00  0.00 
6047+780.00  0.0000  10.00  0.00 
6047+800.00  0.0000  10.00  0.00 
6047+820.00  0.0000  10.00  0.00 
6047+840.00  0.0000  10.00  0.00 
6047+860.00  0.0000  10.00  0.00 
6047+880.00  0.0000  10.00  0.00 
6047+900.00  0.0000  10.00  0.00 
6047+920.00  0.0000  10.00  0.00 
6047+940.00  0.0000  10.00  0.00 
6047+960.00  0.0000  10.00  0.00 
6047+980.00  0.0000  10.00  0.00 
6048+000.00  0.0000  10.00  0.00 
6048+020.00  0.0000  10.00  0.00 
6048+040.00  0.0000  10.00  0.00 
6048+060.00  0.0000  10.00  0.00 

159 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6048+080.00  0.0000  10.00  0.00 
6048+100.00  0.0000  10.00  0.00 
6048+120.00  0.0000  10.00  0.00 
6048+140.00  0.0000  10.00  0.00 
6048+160.00  0.0000  10.00  0.00 
6048+180.00  0.0000  10.00  0.00 
6048+200.00  0.0000  10.00  0.00 
6048+220.00  0.0000  10.00  0.00 
6048+240.00  0.0000  10.00  0.00 
6048+260.00  0.0000  10.00  0.00 
6048+280.00  0.0000  10.00  0.00 
6048+300.00  0.0000  10.00  0.00 
6048+320.00  0.0000  10.00  0.00 
6048+340.00  0.0000  10.00  0.00 
6048+360.00  0.0000  10.00  0.00 
6048+380.00  0.0000  10.00  0.00 
6048+400.00  0.0000  10.00  0.00 
6048+420.00  0.0000  10.00  0.00 
6048+440.00  0.0000  10.00  0.00 
6048+460.00  0.0000  10.00  0.00 
6048+480.00  0.0000  10.00  0.00 
6048+500.00  0.0000  10.00  0.00 
6048+520.00  0.0000  10.00  0.00 
6048+540.00  9.7960  10.00  97.96 
6048+560.00  4.5330  10.00  143.29 
6048+580.00  0.0000  10.00  45.33 
6048+600.00  0.0000  10.00  0.00 
6048+620.00  0.5840  10.00  5.84 
6048+640.00  0.0000  10.00  5.84 
6048+660.00  1.6920  10.00  16.92 
6048+680.00  1.5090  10.00  32.01 
6048+700.00  0.0000  10.00  15.09 
6048+720.00  7.2500  10.00  72.50 
6048+740.00  9.3690  10.00  166.19 
6048+760.00  0.0000  10.00  93.69 
6048+780.00  0.0000  10.00  0.00 
6048+800.00  0.0000  10.00  0.00 
6048+820.00  0.0000  10.00  0.00 
6048+840.00  0.0000  10.00  0.00 
6048+860.00  0.0000  10.00  0.00 
6048+880.00  0.0000  10.00  0.00 
6048+900.00  0.0000  10.00  0.00 
6048+920.00  0.0000  10.00  0.00 
6048+940.00  0.8310  10.00  8.31 
6048+960.00  0.0000  10.00  8.31 
6048+980.00  0.0000  10.00  0.00 
6049+000.00  0.0000  10.00  0.00 
6049+020.00  0.0000  10.00  0.00 

160 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6049+040.00  0.0000  10.00  0.00 
6049+060.00  0.0000  10.00  0.00 
6049+080.00  0.0000  10.00  0.00 
6049+100.00  2.2420  10.00  22.42 
6049+120.00  0.0000  10.00  22.42 
6049+140.00  0.0000  10.00  0.00 
6049+160.00  0.0000  10.00  0.00 
6049+180.00  0.0000  10.00  0.00 
6049+200.00  0.0000  10.00  0.00 
6049+220.00  1.6180  10.00  16.18 
6049+240.00  0.0000  10.00  16.18 
6049+260.00  0.0000  10.00  0.00 
6049+280.00  0.0000  10.00  0.00 
6049+300.00  0.0000  10.00  0.00 
6049+320.00  0.0000  10.00  0.00 
6049+340.00  0.0000  10.00  0.00 
6049+360.00  0.0000  10.00  0.00 
6049+380.00  0.0000  10.00  0.00 
6049+400.00  0.0000  10.00  0.00 
6049+420.00  0.0000  10.00  0.00 
6049+440.00  0.0000  10.00  0.00 
6049+460.00  0.0000  10.00  0.00 
6049+480.00  0.0000  10.00  0.00 
6049+500.00  0.0000  10.00  0.00 
6049+520.00  0.0000  10.00  0.00 
6049+540.00  0.0000  10.00  0.00 
6049+560.00  0.0000  10.00  0.00 
6049+580.00  0.0000  10.00  0.00 
6049+600.00  0.0000  10.00  0.00 
6049+620.00  0.0000  10.00  0.00 
6049+640.00  0.0000  10.00  0.00 
6049+660.00  0.0000  10.00  0.00 
6049+680.00  0.0000  10.00  0.00 
6049+700.00  0.0000  10.00  0.00 
6049+720.00  0.0000  10.00  0.00 
6049+740.00  0.0000  10.00  0.00 
6049+760.00  0.0000  10.00  0.00 
6049+780.00  0.0000  10.00  0.00 
6049+800.00  0.0000  10.00  0.00 
6049+820.00  0.0000  10.00  0.00 
6049+840.00  0.0000  10.00  0.00 
6049+860.00  2.5240  10.00  25.24 
6049+880.00  2.9730  10.00  54.97 
6049+900.00  1.2930  10.00  42.66 
6049+920.00  0.5810  10.00  18.74 
6049+940.00  0.0000  10.00  5.81 
6049+960.00  0.0000  10.00  0.00 
6049+980.00  0.0000  10.00  0.00 

161 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6050+000.00  0.0000  10.00  0.00 
6050+020.00  1.1900  10.00  11.90 
6050+040.00  0.0000  10.00  11.90 
6050+060.00  0.0000  10.00  0.00 
6050+080.00  0.0000  10.00  0.00 
6050+100.00  0.0000  10.00  0.00 
6050+120.00  0.0000  10.00  0.00 
6050+140.00  0.0000  10.00  0.00 
6050+160.00  0.0000  10.00  0.00 
6050+180.00  0.0000  10.00  0.00 
6050+200.00  0.0000  10.00  0.00 
6050+220.00  0.0000  10.00  0.00 
6050+240.00  0.0000  10.00  0.00 
6050+260.00  0.0000  10.00  0.00 
6050+280.00  0.0000  10.00  0.00 
6050+300.00  0.0000  10.00  0.00 
6050+320.00  0.0000  10.00  0.00 
6050+340.00  0.0000  10.00  0.00 
6050+360.00  0.0000  10.00  0.00 
6050+380.00  0.0000  10.00  0.00 
6050+400.00  0.0000  10.00  0.00 
6050+420.00  0.0000  10.00  0.00 
6050+440.00  0.0000  10.00  0.00 
6050+460.00  0.0000  10.00  0.00 
6050+480.00  0.0000  10.00  0.00 
6050+500.00  0.0000  10.00  0.00 
6050+520.00  0.0000  10.00  0.00 
6050+540.00  0.0000  10.00  0.00 
6050+560.00  0.0000  10.00  0.00 
6050+580.00  0.0000  10.00  0.00 
6050+600.00  0.0000  10.00  0.00 
6050+620.00  0.4110  10.00  4.11 
6050+640.00  0.5680  10.00  9.79 
6050+660.00  1.7290  10.00  22.97 
6050+680.00  0.0000  10.00  17.29 
6050+700.00  0.0000  10.00  0.00 
6050+720.00  1.3150  10.00  13.15 
6050+740.00  2.2910  10.00  36.06 
6050+760.00  0.0000  10.00  22.91 
6050+780.00  0.0000  10.00  0.00 
6050+800.00  0.0000  10.00  0.00 
6050+820.00  0.7200  10.00  7.20 
6050+840.00  0.0000  10.00  7.20 
6050+860.00  0.0000  10.00  0.00 
6050+880.00  0.0000  10.00  0.00 
6050+900.00  0.4170  10.00  4.17 
6050+920.00  0.0000  10.00  4.17 
6050+940.00  0.0000  10.00  0.00 

162 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6050+960.00  0.0000  10.00  0.00 
6050+980.00  0.0000  10.00  0.00 
6051+000.00  0.0000  10.00  0.00 
6051+020.00  0.0000  10.00  0.00 
6051+040.00  0.0000  10.00  0.00 
6051+060.00  0.0000  10.00  0.00 
6051+080.00  0.0000  10.00  0.00 
6051+100.00  0.0000  10.00  0.00 
6051+120.00  0.0000  10.00  0.00 
6051+140.00  0.0000  10.00  0.00 
6051+160.00  0.0000  10.00  0.00 
6051+180.00  0.0000  10.00  0.00 
6051+200.00  0.0000  10.00  0.00 
6051+220.00  0.0000  10.00  0.00 
6051+240.00  0.0000  10.00  0.00 
6051+260.00  0.0000  10.00  0.00 
6051+280.00  0.0000  10.00  0.00 
6051+300.00  0.0000  10.00  0.00 
6051+320.00  6.8510  10.00  68.51 
6051+340.00  15.4340  10.00  222.85 
6051+360.00  4.5120  10.00  199.46 
6051+380.00  0.7650  10.00  52.77 
6051+400.00  0.0000  10.00  7.65 
6051+420.00  0.0000  10.00  0.00 
6051+440.00  0.0000  10.00  0.00 
6051+460.00  0.0000  10.00  0.00 
6051+480.00  1.3310  10.00  13.31 
6051+500.00  0.3740  10.00  17.05 
6051+520.00  0.0000  10.00  3.74 
6051+540.00  0.0000  10.00  0.00 
6051+560.00  0.5750  10.00  5.75 
6051+580.00  0.0000  10.00  5.75 
6051+600.00  0.0000  10.00  0.00 
6051+620.00  0.0000  10.00  0.00 
6051+640.00  0.5610  10.00  5.61 
6051+660.00  0.4800  10.00  10.41 
6051+680.00  0.0000  10.00  4.80 
6051+700.00  0.0000  10.00  0.00 
6051+720.00  0.0000  10.00  0.00 
6051+740.00  0.0000  10.00  0.00 
6051+760.00  0.0000  10.00  0.00 
6051+780.00  0.0000  10.00  0.00 
6051+800.00  0.0000  10.00  0.00 
6051+820.00  0.0000  10.00  0.00 
6051+840.00  0.0000  10.00  0.00 
6051+860.00  0.0000  10.00  0.00 
6051+880.00  0.0000  10.00  0.00 
6051+900.00  0.0000  10.00  0.00 

163 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6051+920.00  0.0000  10.00  0.00 
6051+940.00  0.0000  10.00  0.00 
6051+960.00  0.0000  10.00  0.00 
6051+980.00  0.0000  10.00  0.00 
6052+000.00  0.0000  10.00  0.00 
6052+020.00  0.0000  10.00  0.00 
6052+040.00  0.0000  10.00  0.00 
6052+060.00  0.0000  10.00  0.00 
6052+080.00  0.0000  10.00  0.00 
6052+100.00  0.0000  10.00  0.00 
6052+120.00  0.0000  10.00  0.00 
6052+140.00  0.0000  10.00  0.00 
6052+160.00  0.0000  10.00  0.00 
6052+180.00  0.0000  10.00  0.00 
6052+200.00  0.0000  10.00  0.00 
6052+220.00  0.0000  10.00  0.00 
6052+240.00  0.0000  10.00  0.00 
6052+260.00  0.0000  10.00  0.00 
6052+280.00  0.0000  10.00  0.00 
6052+300.00  0.0000  10.00  0.00 
6052+320.00  0.0000  10.00  0.00 
6052+340.00  0.0000  10.00  0.00 
6052+360.00  0.0000  10.00  0.00 
6052+380.00  0.0000  10.00  0.00 
6052+400.00  0.0000  10.00  0.00 
6052+420.00  0.0000  10.00  0.00 
6052+420.00  0.0000  0.00  0.00 
6052+440.00  0.0000  10.00  0.00 
6052+460.00  0.0000  10.00  0.00 
6052+480.00  0.0000  10.00  0.00 
6052+490.00  0.0000  5.00  0.00 
6052+490.00  0.0000  0.00  0.00 
6052+500.00  0.0000  5.00  0.00 
6052+520.00  0.0000  10.00  0.00 
6052+540.00  0.0000  10.00  0.00 
6052+560.00  0.0000  10.00  0.00 
6052+580.00  0.0000  10.00  0.00 
6052+600.00  0.0000  10.00  0.00 
6052+620.00  0.0000  10.00  0.00 
6052+640.00  0.0000  10.00  0.00 
6052+660.00  0.0000  10.00  0.00 
6052+680.00  0.0000  10.00  0.00 
6052+700.00  0.0000  10.00  0.00 
6052+720.00  0.0000  10.00  0.00 
6052+740.00  0.0000  10.00  0.00 
6052+760.00  0.0000  10.00  0.00 
6052+780.00  0.0000  10.00  0.00 
6052+800.00  0.0000  10.00  0.00 

164 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6052+820.00  0.0000  10.00  0.00 
6052+840.00  0.0000  10.00  0.00 
6052+860.00  0.0000  10.00  0.00 
6052+880.00  0.0000  10.00  0.00 
6052+900.00  0.0000  10.00  0.00 
6052+920.00  0.0000  10.00  0.00 
6052+940.00  0.0000  10.00  0.00 
6052+960.00  0.0000  10.00  0.00 
6052+980.00  0.0000  10.00  0.00 
6053+000.00  0.0000  10.00  0.00 
6053+020.00  0.0000  10.00  0.00 
6053+040.00  0.0000  10.00  0.00 
6053+060.00  0.0000  10.00  0.00 
6053+080.00  0.9170  10.00  9.17 
6053+100.00  0.0000  10.00  9.17 
6053+120.00  0.0000  10.00  0.00 
6053+140.00  0.0000  10.00  0.00 
6053+160.00  0.0000  10.00  0.00 
6053+180.00  0.0000  10.00  0.00 
6053+200.00  0.0000  10.00  0.00 
6053+220.00  0.0000  10.00  0.00 
6053+240.00  0.0000  10.00  0.00 
6053+260.00  0.0000  10.00  0.00 
6053+280.00  0.0000  10.00  0.00 
6053+300.00  0.0000  10.00  0.00 
6053+320.00  0.0000  10.00  0.00 
6053+340.00  8.7520  10.00  87.52 
6053+360.00  0.0000  10.00  87.52 
6053+380.00  0.0000  10.00  0.00 
6053+400.00  0.0000  10.00  0.00 
6053+420.00  0.0000  10.00  0.00 
6053+440.00  0.0000  10.00  0.00 
6053+460.00  0.0000  10.00  0.00 
6053+480.00  0.0000  10.00  0.00 
6053+500.00  0.0000  10.00  0.00 
6053+520.00  0.0000  10.00  0.00 
6053+540.00  0.0000  10.00  0.00 
6053+560.00  0.0000  10.00  0.00 
6053+580.00  0.0000  10.00  0.00 
6053+600.00  0.0000  10.00  0.00 
6053+620.00  0.0000  10.00  0.00 
6053+640.00  0.0000  10.00  0.00 
6053+660.00  0.0000  10.00  0.00 
6053+680.00  0.0000  10.00  0.00 
6053+700.00  0.0000  10.00  0.00 
6053+720.00  0.0000  10.00  0.00 
6053+740.00  0.0000  10.00  0.00 
6053+760.00  0.0000  10.00  0.00 

165 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6053+780.00  0.0000  10.00  0.00 
6053+800.00  0.0000  10.00  0.00 
6053+820.00  0.0000  10.00  0.00 
6053+840.00  0.0000  10.00  0.00 
6053+860.00  0.0000  10.00  0.00 
6053+880.00  0.0000  10.00  0.00 
6053+900.00  0.0000  10.00  0.00 
6053+920.00  0.0000  10.00  0.00 
6053+940.00  0.0000  10.00  0.00 
6053+960.00  0.0000  10.00  0.00 
6053+980.00  0.0000  10.00  0.00 
6054+000.00  0.0000  10.00  0.00 
6054+020.00  0.0000  10.00  0.00 
6054+040.00  0.0000  10.00  0.00 
6054+060.00  0.0000  10.00  0.00 
6054+080.00  0.0000  10.00  0.00 
6054+100.00  0.0000  10.00  0.00 
6054+120.00  0.0000  10.00  0.00 
6054+140.00  0.0000  10.00  0.00 
6054+160.00  0.0000  10.00  0.00 
6054+180.00  0.0000  10.00  0.00 
6054+200.00  0.0000  10.00  0.00 
6054+220.00  0.0000  10.00  0.00 
6054+240.00  0.0000  10.00  0.00 
6054+260.00  0.0000  10.00  0.00 
6054+280.00  0.0000  10.00  0.00 
6054+300.00  0.0000  10.00  0.00 
6054+320.00  0.0000  10.00  0.00 
6054+340.00  0.5840  10.00  5.84 
6054+360.00  0.0000  10.00  5.84 
6054+380.00  0.0000  10.00  0.00 
6054+400.00  0.0000  10.00  0.00 
6054+420.00  0.0000  10.00  0.00 
6054+440.00  0.7880  10.00  7.88 
6054+460.00  1.4340  10.00  22.22 
6054+480.00  5.7780  10.00  72.12 
6054+500.00  3.4670  10.00  92.45 
6054+520.00  0.0000  10.00  34.67 
6054+540.00  0.7710  10.00  7.71 
6054+560.00  0.0000  10.00  7.71 
6054+580.00  0.0000  10.00  0.00 
6054+600.00  0.0000  10.00  0.00 
6054+620.00  0.0000  10.00  0.00 
6054+640.00  0.0000  10.00  0.00 
6054+660.00  0.7820  10.00  7.82 
6054+680.00  0.0000  10.00  7.82 
6054+700.00  0.0000  10.00  0.00 
6054+720.00  0.0000  10.00  0.00 

166 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6054+740.00  0.0000  10.00  0.00 
6054+760.00  0.3820  10.00  3.82 
6054+780.00  0.0000  10.00  3.82 
6054+800.00  0.0000  10.00  0.00 
6054+820.00  0.0000  10.00  0.00 
6054+840.00  0.0000  10.00  0.00 
6054+860.00  0.0000  10.00  0.00 
6054+880.00  0.0000  10.00  0.00 
6054+900.00  0.0000  10.00  0.00 
6054+920.00  0.0000  10.00  0.00 
6054+940.00  0.0000  10.00  0.00 
6054+960.00  0.0000  10.00  0.00 
6054+980.00  0.0000  10.00  0.00 
6055+000.00  0.0000  10.00  0.00 
6055+020.00  0.0000  10.00  0.00 
6055+040.00  0.0000  10.00  0.00 
6055+060.00  0.0000  10.00  0.00 
6055+080.00  0.0000  10.00  0.00 
6055+100.00  0.0000  10.00  0.00 
6055+120.00  0.0000  10.00  0.00 
6055+140.00  0.0000  10.00  0.00 
6055+160.00  0.0000  10.00  0.00 
6055+180.00  0.0000  10.00  0.00 
6055+200.00  0.0000  10.00  0.00 
6055+220.00  0.0000  10.00  0.00 
6055+240.00  0.0000  10.00  0.00 
6055+260.00  0.0000  10.00  0.00 
6055+280.00  0.0000  10.00  0.00 
6055+300.00  1.0540  10.00  10.54 
6055+320.00  0.0000  10.00  10.54 
6055+340.00  0.0000  10.00  0.00 
6055+360.00  0.0000  10.00  0.00 
6055+380.00  0.0000  10.00  0.00 
6055+400.00  0.0000  10.00  0.00 
6055+420.00  0.0000  10.00  0.00 
6055+440.00  0.0000  10.00  0.00 
6055+460.00  0.0000  10.00  0.00 
6055+480.00  0.0000  10.00  0.00 
6055+500.00  0.0000  10.00  0.00 
6055+520.00  0.0000  10.00  0.00 
6055+540.00  0.0000  10.00  0.00 
6055+560.00  0.0000  10.00  0.00 
6055+580.00  0.0000  10.00  0.00 
6055+600.00  0.0000  10.00  0.00 
6055+620.00  0.0000  10.00  0.00 
6055+640.00  0.0000  10.00  0.00 
6055+660.00  0.0000  10.00  0.00 
6055+680.00  0.0000  10.00  0.00 

167 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6055+700.00  0.0000  10.00  0.00 
6055+720.00  0.0000  10.00  0.00 
6055+740.00  0.0000  10.00  0.00 
6055+760.00  0.0000  10.00  0.00 
6055+780.00  0.0000  10.00  0.00 
6055+800.00  0.0000  10.00  0.00 
6055+820.00  0.8600  10.00  8.60 
6055+840.00  0.0000  10.00  8.60 
6055+860.00  0.0000  10.00  0.00 
6055+880.00  0.0000  10.00  0.00 
6055+900.00  0.0000  10.00  0.00 
6055+920.00  0.0000  10.00  0.00 
6055+940.00  0.0000  10.00  0.00 
6055+960.00  0.0000  10.00  0.00 
6055+980.00  0.0000  10.00  0.00 
6056+000.00  0.0000  10.00  0.00 
6056+020.00  0.0000  10.00  0.00 
6056+040.00  0.0000  10.00  0.00 
6056+060.00  0.0000  10.00  0.00 
6056+080.00  2.6120  10.00  26.12 
6056+100.00  0.0000  10.00  26.12 
6056+120.00  0.0000  10.00  0.00 
6056+140.00  0.0000  10.00  0.00 
6056+160.00  0.0000  10.00  0.00 
6056+170.00  0.0000  5.00  0.00 
6056+170.00  0.0000  0.00  0.00 
6056+180.00  0.0000  5.00  0.00 
6056+200.00  0.0000  10.00  0.00 
6056+220.00  0.0000  10.00  0.00 
6056+240.00  0.0000  10.00  0.00 
6056+260.00  0.0000  10.00  0.00 
6056+280.00  0.0000  10.00  0.00 
6056+300.00  0.0000  10.00  0.00 
6056+300.00  0.0000  0.00  0.00 
6056+320.00  0.0000  10.00  0.00 
6056+340.00  0.0000  10.00  0.00 
6056+360.00  0.0000  10.00  0.00 
6056+380.00  0.0000  10.00  0.00 
6056+400.00  0.0000  10.00  0.00 
6056+420.00  0.0000  10.00  0.00 
6056+440.00  0.0000  10.00  0.00 
6056+460.00  0.0000  10.00  0.00 
6056+480.00  0.0000  10.00  0.00 
6056+500.00  0.0000  10.00  0.00 
6056+520.00  0.0000  10.00  0.00 
6056+540.00  0.0000  10.00  0.00 
6056+560.00  0.0000  10.00  0.00 
6056+580.00  0.0000  10.00  0.00 

168 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6056+600.00  0.0000  10.00  0.00 
6056+614.06  0.9210  7.03  6.48 
6056+620.00  1.0910  2.97  5.97 
6056+640.00  0.0000  10.00  10.91 
6056+644.06  0.0000  2.03  0.00 
6056+660.00  0.0000  7.97  0.00 
6056+680.00  0.0000  10.00  0.00 
6056+700.00  0.0000  10.00  0.00 
6056+720.00  0.0000  10.00  0.00 
6056+734.82  0.0000  7.41  0.00 
6056+740.00  0.0000  2.59  0.00 
6056+760.00  0.8840  10.00  8.84 
6056+764.82  0.0000  2.41  2.13 
6056+770.00  0.0000  2.59  0.00 
6056+770.00  0.0000  0.00  0.00 
6056+780.00  0.0000  5.00  0.00 
6056+800.00  1.7590  10.00  17.59 
6056+820.00  4.2030  10.00  59.62 
6056+840.00  0.0000  10.00  42.03 
6056+860.00  0.0000  10.00  0.00 
6056+860.00  0.0000  0.00  0.00 
6056+880.00  0.0000  10.00  0.00 
6056+900.00  0.0000  10.00  0.00 
6056+920.00  0.0000  10.00  0.00 
6056+940.00  0.8460  10.00  8.46 
6056+960.00  1.2990  10.00  21.45 
6056+980.00  0.0000  10.00  12.99 
6057+000.00  0.0000  10.00  0.00 
6057+020.00  0.0000  10.00  0.00 
6057+040.00  0.0000  10.00  0.00 
6057+060.00  0.0000  10.00  0.00 
6057+080.00  0.0000  10.00  0.00 
6057+100.00  0.0000  10.00  0.00 
6057+120.00  0.0000  10.00  0.00 
6057+140.00  0.0000  10.00  0.00 
6057+160.00  0.0000  10.00  0.00 
6057+180.00  0.0000  10.00  0.00 
6057+200.00  0.0000  10.00  0.00 
6057+220.00  0.0000  10.00  0.00 
6057+240.00  0.0000  10.00  0.00 
6057+260.00  0.0000  10.00  0.00 
6057+270.00  0.0000  5.00  0.00 
6057+270.00  0.0000  0.00  0.00 
6057+280.00  0.0000  5.00  0.00 
6057+300.00  0.0000  10.00  0.00 
6057+320.00  0.0000  10.00  0.00 
6057+340.00  0.0000  10.00  0.00 
6057+340.00  0.0000  0.00  0.00 

169 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6057+360.00  0.0000  10.00  0.00 
6057+380.00  2.9950  10.00  29.95 
6057+400.00  2.4960  10.00  54.91 
6057+420.00  3.9680  10.00  64.64 
6057+440.00  10.6690  10.00  146.37 
6057+460.00  18.1080  10.00  287.77 
6057+480.00  0.0000  10.00  181.08 
6057+500.00  0.0000  10.00  0.00 
6057+520.00  0.0000  10.00  0.00 
6057+540.00  0.0000  10.00  0.00 
6057+560.00  0.6600  10.00  6.60 
6057+580.00  0.0000  10.00  6.60 
6057+600.00  0.0000  10.00  0.00 
6057+620.00  0.0000  10.00  0.00 
6057+640.00  0.0000  10.00  0.00 
6057+660.00  0.0000  10.00  0.00 
6057+680.00  0.0000  10.00  0.00 
6057+700.00  0.0000  10.00  0.00 
6057+720.00  0.0000  10.00  0.00 
6057+740.00  0.0000  10.00  0.00 
6057+760.00  0.0000  10.00  0.00 
6057+780.00  0.0000  10.00  0.00 
6057+800.00  0.0000  10.00  0.00 
6057+820.00  0.0000  10.00  0.00 
6057+840.00  0.0000  10.00  0.00 
6057+860.00  3.7220  10.00  37.22 
6057+880.00  0.0000  10.00  37.22 
6057+900.00  0.0000  10.00  0.00 
6057+920.00  0.0000  10.00  0.00 
6057+940.00  0.0000  10.00  0.00 
6057+960.00  0.0000  10.00  0.00 
6057+980.00  0.5720  10.00  5.72 
6058+000.00  0.4630  10.00  10.35 
6058+020.00  0.0000  10.00  4.63 
6058+040.00  0.0000  10.00  0.00 
6058+060.00  0.5140  10.00  5.14 
6058+080.00  0.0000  10.00  5.14 
6058+100.00  0.0000  10.00  0.00 
6058+120.00  0.5130  10.00  5.13 
6058+140.00  0.0000  10.00  5.13 
6058+160.00  0.5400  10.00  5.40 
6058+180.00  0.0000  10.00  5.40 
6058+200.00  0.0000  10.00  0.00 
6058+220.00  0.0000  10.00  0.00 
6058+240.00  0.0000  10.00  0.00 
6058+260.00  0.0000  10.00  0.00 
6058+280.00  0.0000  10.00  0.00 
6058+300.00  0.0000  10.00  0.00 

170 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6058+320.00  0.0000  10.00  0.00 
6058+340.00  0.0000  10.00  0.00 
6058+360.00  0.9140  10.00  9.14 
6058+380.00  0.0000  10.00  9.14 
6058+400.00  0.0000  10.00  0.00 
6058+420.00  0.0000  10.00  0.00 
6058+440.00  0.0000  10.00  0.00 
6058+460.00  0.0000  10.00  0.00 
6058+480.00  0.0000  10.00  0.00 
6058+500.00  0.0000  10.00  0.00 
6058+520.00  0.0000  10.00  0.00 
6058+540.00  0.0000  10.00  0.00 
6058+560.00  1.1970  10.00  11.97 
6058+580.00  0.0000  10.00  11.97 
6058+600.00  0.0000  10.00  0.00 
6058+620.00  0.0000  10.00  0.00 
6058+640.00  0.0000  10.00  0.00 
6058+660.00  0.0000  10.00  0.00 
6058+680.00  0.0000  10.00  0.00 
6058+700.00  1.1390  10.00  11.39 
6058+720.00  1.3390  10.00  24.78 
6058+740.00  0.0000  10.00  13.39 
6058+760.00  0.0000  10.00  0.00 
6058+780.00  0.9770  10.00  9.77 
6058+800.00  0.0000  10.00  9.77 
6058+820.00  0.0000  10.00  0.00 
6058+840.00  4.8450  10.00  48.45 
6058+860.00  9.6970  10.00  145.42 
6058+880.00  9.3200  10.00  190.17 
6058+900.00  0.0000  10.00  93.20 
6058+920.00  0.0000  10.00  0.00 
6058+940.00  0.0000  10.00  0.00 
6058+960.00  0.0000  10.00  0.00 
6058+980.00  0.0000  10.00  0.00 
6059+000.00  0.0000  10.00  0.00 
6059+020.00  0.0000  10.00  0.00 
6059+040.00  0.6140  10.00  6.14 
6059+060.00  0.0000  10.00  6.14 
6059+080.00  0.0000  10.00  0.00 
6059+100.00  0.0000  10.00  0.00 
6059+120.00  0.7300  10.00  7.30 
6059+140.00  0.5620  10.00  12.92 
6059+160.00  0.0000  10.00  5.62 
6059+180.00  0.5970  10.00  5.97 
6059+200.00  0.0000  10.00  5.97 
6059+220.00  0.0000  10.00  0.00 
6059+240.00  0.0000  10.00  0.00 
6059+260.00  1.9900  10.00  19.90 

171 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6059+280.00  0.0000  10.00  19.90 
6059+300.00  1.6140  10.00  16.14 
6059+320.00  0.0000  10.00  16.14 
6059+340.00  0.0000  10.00  0.00 
6059+360.00  0.0000  10.00  0.00 
6059+380.00  0.0000  10.00  0.00 
6059+400.00  0.0000  10.00  0.00 
6059+420.00  0.0000  10.00  0.00 
6059+440.00  0.0000  10.00  0.00 
6059+460.00  0.0000  10.00  0.00 
6059+480.00  1.0310  10.00  10.31 
6059+500.00  0.6140  10.00  16.45 
6059+520.00  0.0000  10.00  6.14 
6059+540.00  0.0000  10.00  0.00 
6059+560.00  0.0000  10.00  0.00 
6059+580.00  0.0000  10.00  0.00 
6059+600.00  0.0000  10.00  0.00 
6059+620.00  0.0000  10.00  0.00 
6059+640.00  0.0000  10.00  0.00 
6059+660.00  0.0000  10.00  0.00 
6059+680.00  1.0530  10.00  10.53 
6059+700.00  0.5260  10.00  15.79 
6059+720.00  0.0000  10.00  5.26 
6059+740.00  0.0000  10.00  0.00 
6059+760.00  0.0000  10.00  0.00 
6059+780.00  0.0000  10.00  0.00 
6059+800.00  0.0000  10.00  0.00 
6059+820.00  1.0080  10.00  10.08 
6059+840.00  0.0000  10.00  10.08 
6059+860.00  0.5340  10.00  5.34 
6059+880.00  0.0000  10.00  5.34 
6059+900.00  0.0000  10.00  0.00 
6059+920.00  0.0000  10.00  0.00 
6059+940.00  0.0000  10.00  0.00 
6059+960.00  0.0000  10.00  0.00 
6059+980.00  0.0000  10.00  0.00 
6060+000.00  0.0000  10.00  0.00 
6060+020.00  0.0000  10.00  0.00 
6060+040.00  0.0000  10.00  0.00 
6060+060.00  0.0000  10.00  0.00 
6060+080.00  0.0000  10.00  0.00 
6060+100.00  0.0000  10.00  0.00 
6060+120.00  0.0000  10.00  0.00 
6060+140.00  0.0000  10.00  0.00 
6060+160.00  0.0000  10.00  0.00 
6060+180.00  0.0000  10.00  0.00 
6060+200.00  1.6740  10.00  16.74 
6060+220.00  0.5850  10.00  22.59 

172 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6060+240.00  0.0000  10.00  5.85 
6060+260.00  0.0000  10.00  0.00 
6060+280.00  0.0000  10.00  0.00 
6060+300.00  0.0000  10.00  0.00 
6060+320.00  0.0000  10.00  0.00 
6060+340.00  0.0000  10.00  0.00 
6060+360.00  1.4300  10.00  14.30 
6060+380.00  5.1460  10.00  65.76 
6060+400.00  0.0000  10.00  51.46 
6060+420.00  0.0000  10.00  0.00 
6060+440.00  0.0000  10.00  0.00 
6060+460.00  0.0000  10.00  0.00 
6060+480.00  0.0000  10.00  0.00 
6060+500.00  0.0000  10.00  0.00 
6060+520.00  0.0000  10.00  0.00 
6060+540.00  0.6890  10.00  6.89 
6060+560.00  0.0000  10.00  6.89 
6060+580.00  0.0000  10.00  0.00 
6060+600.00  0.4450  10.00  4.45 
6060+620.00  0.0000  10.00  4.45 
6060+640.00  0.0000  10.00  0.00 
6060+660.00  0.0000  10.00  0.00 
6060+680.00  0.0000  10.00  0.00 
6060+700.00  0.0000  10.00  0.00 
6060+720.00  0.5830  10.00  5.83 
6060+740.00  0.0000  10.00  5.83 
6060+760.00  8.8200  10.00  88.20 
6060+780.00  2.1840  10.00  110.04 
6060+800.00  0.0000  10.00  21.84 
6060+820.00  5.9050  10.00  59.05 
6060+840.00  0.0000  10.00  59.05 
6060+860.00  0.0000  10.00  0.00 
6060+880.00  0.0000  10.00  0.00 
6060+900.00  0.0000  10.00  0.00 
6060+920.00  0.0000  10.00  0.00 
6060+940.00  0.0000  10.00  0.00 
6060+960.00  0.0000  10.00  0.00 
6060+980.00  0.0000  10.00  0.00 
6061+000.00  0.0000  10.00  0.00 
6061+020.00  0.0000  10.00  0.00 
6061+040.00  0.0000  10.00  0.00 
6061+060.00  0.0000  10.00  0.00 
6061+080.00  0.0000  10.00  0.00 
6061+100.00  0.0000  10.00  0.00 
6061+120.00  0.0000  10.00  0.00 
6061+140.00  0.0000  10.00  0.00 
6061+160.00  0.5150  10.00  5.15 
6061+180.00  0.0000  10.00  5.15 

173 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6061+200.00  0.0000  10.00  0.00 
6061+220.00  0.0000  10.00  0.00 
6061+240.00  0.0000  10.00  0.00 
6061+260.00  0.0000  10.00  0.00 
6061+280.00  0.0000  10.00  0.00 
6061+300.00  0.0000  10.00  0.00 
6061+320.00  0.0000  10.00  0.00 
6061+340.00  0.0000  10.00  0.00 
6061+360.00  0.0000  10.00  0.00 
6061+380.00  0.0000  10.00  0.00 
6061+400.00  0.0000  10.00  0.00 
6061+420.00  0.0000  10.00  0.00 
6061+440.00  0.0000  10.00  0.00 
6061+460.00  0.0000  10.00  0.00 
6061+480.00  0.0000  10.00  0.00 
6061+500.00  0.5600  10.00  5.60 
6061+520.00  0.0000  10.00  5.60 
6061+540.00  0.0000  10.00  0.00 
6061+560.00  0.0000  10.00  0.00 
6061+580.00  0.7700  10.00  7.70 
6061+600.00  2.1860  10.00  29.56 
6061+620.00  0.0000  10.00  21.86 
6061+640.00  0.0000  10.00  0.00 
6061+660.00  0.0000  10.00  0.00 
6061+680.00  0.0000  10.00  0.00 
6061+700.00  0.0000  10.00  0.00 
6061+720.00  0.0000  10.00  0.00 
6061+740.00  0.0000  10.00  0.00 
6061+760.00  0.0000  10.00  0.00 
6061+780.00  0.0000  10.00  0.00 
6061+800.00  0.0000  10.00  0.00 
6061+820.00  0.0000  10.00  0.00 
6061+840.00  0.0000  10.00  0.00 
6061+860.00  0.0000  10.00  0.00 
6061+880.00  0.0000  10.00  0.00 
6061+900.00  0.0000  10.00  0.00 
6061+920.00  0.0000  10.00  0.00 
6061+940.00  0.0000  10.00  0.00 
6061+960.00  0.0000  10.00  0.00 
6061+980.00  0.0000  10.00  0.00 
6062+000.00  0.0000  10.00  0.00 
6062+020.00  0.0000  10.00  0.00 
6062+040.00  0.0000  10.00  0.00 
6062+060.00  1.3860  10.00  13.86 
6062+080.00  1.5140  10.00  29.00 
6062+100.00  0.0000  10.00  15.14 
6062+120.00  0.0000  10.00  0.00 
6062+140.00  0.0000  10.00  0.00 

174 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6062+160.00  0.0000  10.00  0.00 
6062+180.00  0.0000  10.00  0.00 
6062+200.00  0.0000  10.00  0.00 
6062+220.00  0.0000  10.00  0.00 
6062+240.00  0.0000  10.00  0.00 
6062+260.00  0.0000  10.00  0.00 
6062+280.00  0.0000  10.00  0.00 
6062+300.00  0.0000  10.00  0.00 
6062+320.00  0.0000  10.00  0.00 
6062+340.00  0.0000  10.00  0.00 
6062+360.00  0.0000  10.00  0.00 
6062+380.00  0.0000  10.00  0.00 
6062+400.00  0.0000  10.00  0.00 
6062+420.00  0.0000  10.00  0.00 
6062+440.00  0.0000  10.00  0.00 
6062+460.00  0.0000  10.00  0.00 
6062+480.00  0.0000  10.00  0.00 
6062+500.00  0.0000  10.00  0.00 
6062+520.00  0.0000  10.00  0.00 
6062+540.00  0.0000  10.00  0.00 
6062+560.00  0.0000  10.00  0.00 
6062+580.00  0.0000  10.00  0.00 
6062+600.00  0.0000  10.00  0.00 
6062+620.00  0.0000  10.00  0.00 
6062+640.00  0.0000  10.00  0.00 
6062+660.00  0.6140  10.00  6.14 
6062+680.00  0.0000  10.00  6.14 
6062+700.00  0.9450  10.00  9.45 
6062+720.00  0.0000  10.00  9.45 
6062+740.00  0.0000  10.00  0.00 
6062+760.00  0.0000  10.00  0.00 
6062+780.00  0.0000  10.00  0.00 
6062+800.00  0.0000  10.00  0.00 
6062+820.00  0.7150  10.00  7.15 
6062+840.00  9.9780  10.00  106.93 
6062+860.00  11.9720  10.00  219.50 
6062+880.00  0.9420  10.00  129.14 
6062+900.00  0.0000  10.00  9.42 
6062+920.00  0.0000  10.00  0.00 
6062+940.00  0.0000  10.00  0.00 
6062+960.00  0.0000  10.00  0.00 
6062+980.00  0.6730  10.00  6.73 
6063+000.00  0.0000  10.00  6.73 
6063+020.00  0.0000  10.00  0.00 
6063+040.00  0.0000  10.00  0.00 
6063+060.00  0.0000  10.00  0.00 
6063+080.00  0.0000  10.00  0.00 
6063+100.00  3.6500  10.00  36.50 

175 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6063+120.00  4.0550  10.00  77.05 
6063+140.00  0.0000  10.00  40.55 
6063+160.00  0.0000  10.00  0.00 
6063+180.00  0.0000  10.00  0.00 
6063+200.00  0.0000  10.00  0.00 
6063+220.00  0.0000  10.00  0.00 
6063+240.00  0.0000  10.00  0.00 
6063+260.00  0.0000  10.00  0.00 
6063+280.00  0.0000  10.00  0.00 
6063+300.00  0.0000  10.00  0.00 
6063+320.00  0.0000  10.00  0.00 
6063+340.00  0.0000  10.00  0.00 
6063+360.00  0.0000  10.00  0.00 
6063+380.00  0.0000  10.00  0.00 
6063+400.00  0.0000  10.00  0.00 
6063+420.00  0.0000  10.00  0.00 
6063+440.00  1.6870  10.00  16.87 
6063+460.00  0.7880  10.00  24.75 
6063+480.00  0.0000  10.00  7.88 
6063+500.00  0.0000  10.00  0.00 
6063+520.00  3.2020  10.00  32.02 
6063+540.00  5.6150  10.00  88.17 
6063+560.00  0.0000  10.00  56.15 
6063+580.00  0.0000  10.00  0.00 
6063+600.00  0.0000  10.00  0.00 
6063+620.00  0.0000  10.00  0.00 
6063+640.00  0.0000  10.00  0.00 
6063+660.00  0.0000  10.00  0.00 
6063+680.00  0.0000  10.00  0.00 
6063+700.00  0.0000  10.00  0.00 
6063+720.00  0.0000  10.00  0.00 
6063+740.00  1.8300  10.00  18.30 
6063+760.00  0.0000  10.00  18.30 
6063+780.00  0.0000  10.00  0.00 
6063+800.00  0.0000  10.00  0.00 
6063+820.00  0.0000  10.00  0.00 
6063+840.00  0.0000  10.00  0.00 
6063+860.00  0.0000  10.00  0.00 
6063+880.00  0.0000  10.00  0.00 
6063+900.00  1.2300  10.00  12.30 
6063+920.00  0.0000  10.00  12.30 
6063+940.00  0.0000  10.00  0.00 
6063+960.00  0.0000  10.00  0.00 
6063+980.00  0.0000  10.00  0.00 
6064+000.00  0.0000  10.00  0.00 
6064+020.00  0.0000  10.00  0.00 
6064+040.00  0.0000  10.00  0.00 
6064+060.00  0.0000  10.00  0.00 

176 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6064+080.00  0.4430  10.00  4.43 
6064+100.00  0.0000  10.00  4.43 
6064+120.00  0.0000  10.00  0.00 
6064+140.00  0.0000  10.00  0.00 
6064+160.00  1.1190  10.00  11.19 
6064+180.00  0.0000  10.00  11.19 
6064+200.00  0.0000  10.00  0.00 
6064+220.00  0.0000  10.00  0.00 
6064+240.00  0.0000  10.00  0.00 
6064+260.00  0.6000  10.00  6.00 
6064+280.00  4.2360  10.00  48.36 
6064+300.00  13.4450  10.00  176.81 
6064+320.00  1.1680  10.00  146.13 
6064+340.00  0.0000  10.00  11.68 
6064+360.00  0.0000  10.00  0.00 
6064+380.00  0.0000  10.00  0.00 
6064+400.00  0.0000  10.00  0.00 
6064+420.00  0.0000  10.00  0.00 
6064+440.00  0.0000  10.00  0.00 
6064+460.00  1.0840  10.00  10.84 
6064+480.00  2.0020  10.00  30.86 
6064+500.00  0.0000  10.00  20.02 
6064+520.00  0.0000  10.00  0.00 
6064+540.00  0.0000  10.00  0.00 
6064+560.00  0.0000  10.00  0.00 
6064+580.00  0.0000  10.00  0.00 
6064+600.00  0.0000  10.00  0.00 
6064+620.00  0.0000  10.00  0.00 
6064+640.00  11.5560  10.00  115.56 
6064+660.00  0.0000  10.00  115.56 
6064+680.00  0.0000  10.00  0.00 
6064+700.00  0.0000  10.00  0.00 
6064+720.00  0.0000  10.00  0.00 
6064+740.00  0.0000  10.00  0.00 
6064+760.00  0.0000  10.00  0.00 
6064+780.00  0.0000  10.00  0.00 
6064+800.00  0.0000  10.00  0.00 
6064+820.00  0.0000  10.00  0.00 
6064+840.00  0.0000  10.00  0.00 
6064+860.00  0.0000  10.00  0.00 
6064+880.00  0.0000  10.00  0.00 
6064+900.00  0.0000  10.00  0.00 
6064+920.00  0.0000  10.00  0.00 
6064+940.00  0.0000  10.00  0.00 
6064+960.00  0.0000  10.00  0.00 
6064+980.00  0.0000  10.00  0.00 
6065+000.00  0.0000  10.00  0.00 
6065+020.00  0.0000  10.00  0.00 

177 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6065+040.00  0.0000  10.00  0.00 
6065+060.00  1.8850  10.00  18.85 
6065+080.00  0.9520  10.00  28.37 
6065+100.00  0.0000  10.00  9.52 
6065+120.00  0.0000  10.00  0.00 
6065+140.00  0.0000  10.00  0.00 
6065+160.00  0.0000  10.00  0.00 
6065+180.00  0.5030  10.00  5.03 
6065+200.00  0.0000  10.00  5.03 
6065+220.00  0.0000  10.00  0.00 
6065+240.00  0.9040  10.00  9.04 
6065+260.00  0.3670  10.00  12.71 
6065+280.00  0.0000  10.00  3.67 
6065+300.00  0.0000  10.00  0.00 
6065+320.00  0.0000  10.00  0.00 
6065+340.00  0.0000  10.00  0.00 
6065+360.00  0.0000  10.00  0.00 
6065+380.00  0.0000  10.00  0.00 
6065+400.00  0.0000  10.00  0.00 
6065+420.00  0.6050  10.00  6.05 
6065+440.00  1.7910  10.00  23.96 
6065+460.00  0.0000  10.00  17.91 
6065+480.00  0.0000  10.00  0.00 
6065+500.00  0.0000  10.00  0.00 
6065+520.00  0.0000  10.00  0.00 
6065+540.00  0.0000  10.00  0.00 
6065+560.00  0.0000  10.00  0.00 
6065+560.00  0.0000  0.00  0.00 
6065+580.00  0.0000  10.00  0.00 
6065+600.00  1.0140  10.00  10.14 
6065+620.00  0.0000  10.00  10.14 
6065+640.00  0.4280  10.00  4.28 
6065+660.00  1.0290  10.00  14.57 
6065+680.00  0.0000  10.00  10.29 
6065+700.00  0.0000  10.00  0.00 
6065+710.00  0.7670  5.00  3.84 
6065+710.00  0.8000  0.00  0.00 
6065+720.00  0.3550  5.00  5.78 
6065+740.00  0.0000  10.00  3.55 
6065+760.00  0.0000  10.00  0.00 
6065+780.00  0.0000  10.00  0.00 
6065+800.00  0.0000  10.00  0.00 
6065+820.00  0.0000  10.00  0.00 
6065+840.00  0.0000  10.00  0.00 
6065+860.00  0.7460  10.00  7.46 
6065+880.00  8.4700  10.00  92.16 
6065+900.00  2.5990  10.00  110.69 
6065+920.00  0.0000  10.00  25.99 

178 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6065+940.00  0.0000  10.00  0.00 
6065+960.00  0.0000  10.00  0.00 
6065+980.00  0.0000  10.00  0.00 
6066+000.00  0.0000  10.00  0.00 
6066+020.00  0.0000  10.00  0.00 
6066+040.00  0.0000  10.00  0.00 
6066+060.00  1.1150  10.00  11.15 
6066+080.00  0.9870  10.00  21.02 
6066+100.00  0.6140  10.00  16.01 
6066+120.00  0.0000  10.00  6.14 
6066+140.00  0.5880  10.00  5.88 
6066+160.00  0.0000  10.00  5.88 
6066+180.00  0.0000  10.00  0.00 
6066+200.00  0.0000  10.00  0.00 
6066+220.00  0.0000  10.00  0.00 
6066+240.00  0.0000  10.00  0.00 
6066+260.00  0.0000  10.00  0.00 
6066+280.00  0.0000  10.00  0.00 
6066+300.00  0.0000  10.00  0.00 
6066+320.00  0.0000  10.00  0.00 
6066+340.00  0.0000  10.00  0.00 
6066+360.00  0.0000  10.00  0.00 
6066+380.00  0.0000  10.00  0.00 
6066+400.00  0.0000  10.00  0.00 
6066+420.00  0.0000  10.00  0.00 
6066+440.00  0.0000  10.00  0.00 
6066+460.00  0.4570  10.00  4.57 
6066+480.00  0.0000  10.00  4.57 
6066+500.00  5.0350  10.00  50.35 
6066+520.00  6.4750  10.00  115.10 
6066+540.00  1.1940  10.00  76.69 
6066+560.00  0.0000  10.00  11.94 
6066+580.00  0.0000  10.00  0.00 
6066+600.00  0.0000  10.00  0.00 
6066+620.00  0.0000  10.00  0.00 
6066+640.00  0.0000  10.00  0.00 
6066+660.00  0.0000  10.00  0.00 
6066+680.00  0.0000  10.00  0.00 
6066+700.00  0.0000  10.00  0.00 
6066+720.00  0.0000  10.00  0.00 
6066+740.00  0.0000  10.00  0.00 
6066+760.00  0.0000  10.00  0.00 
6066+780.00  0.0000  10.00  0.00 
6066+800.00  1.7940  10.00  17.94 
6066+820.00  0.0000  10.00  17.94 
6066+840.00  1.3950  10.00  13.95 
6066+860.00  0.0000  10.00  13.95 
6066+880.00  0.0000  10.00  0.00 

179 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Semi‐  Volumen 


Cadenamiento
Corte  distancia  Corte 
6066+900.00  0.0000  10.00  0.00 
6066+920.00  0.0000  10.00  0.00 
6066+940.00  0.0000  10.00  0.00 
6066+960.00  0.0000  10.00  0.00 
6066+980.00  0.0000  10.00  0.00 
6067+000.00  0.0000  10.00  0.00 
 

5.5.1. Cortes en zonas de la vía del FIT 
En las zonas en donde el trazado de la vía proyectada coincida con la antigua línea del FIT, como se 
muestra  en  la  Figura  5  se  tiene  previsto  la  excavación  y  remoción  de  la  plataforma  ferroviaria 
existente, para lo cual se sustituirá ese material excavado con material competente de relleno que 
cumpla con la normativa SCT. 

 
FIGURA 5 SECCIÓN TRANSVERSAL DE ZONAS DONDE INTERACTÚA LA LÍNEA DEL FIT CON EL TRAZADO DEL TRAMO 3 

Para el material de relleno se tiene previsto realizar tratamiento necesario del volumen excavado 
de la plataforma existente del FIT para cumplir con la calidad establecida por la normativa SCT. De 
no ser posible utilizar el material retirado se utilizará material de relleno producto de los bancos de 
préstamos autorizados. 

5.6. REVEGETACIÓN DE TALUDES 
A  lo  largo  del  trazado  ferroviario  se  reutilizará  la  tierra  vegetal  producto  de  despalme  para  el 
extendido y compactado de los taludes de terraplén en aquellas zonas no propensas a inundaciones 
tal  como  se  muestra  en  la  Figura  6.  Esto  con  la  finalidad  de  proteger  contra  el  intemperismo  y 
degradación  a  las  capas  de  material  que  conforman  el  terraplén  y  dotarlo  de  cierta  estabilidad 
adicional. 

180 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
FIGURA 6 PROPUESTA DE REVEGETACIÓN DE TALUDES 

El material restante del despalme se reutilizará para el relleno del camino de servicio, aplicándole 
un tratamiento de 1% de cal para mejorar las propiedades del terreno y con una pendiente del 3% 
para que desagüe en dirección opuesta a la plataforma del tren. 

Una  vez  realizados  la  revegetación  de  taludes  y  el  camino  de  servicio,  el  material  restante  del 
despalme  se  utilizará  para  revegetar  el  pie  de  terraplén  opuesto  al  lado  del  camino  de  servicio, 
aplicando la misma pendiente del 3% con el objetivo de que sirva para evitar acumulaciones de agua 
en el pie del terraplén. 

5.7. ZONAS ENCHARCABLES 
Tras haber realizado los análisis hidráulicos correspondientes, determinamos que en el Tramo 3 del 
Tren Maya no existen zonas inundables. Sí existen sin embargo zonas de acumulación de agua, en 
las que debido a las características topográficas de la zona se pudiera presentar una lámina de agua 
en eventos de lluvia.  

En  estas  zonas,  y  siguiendo  normativas  internacionales  (ADIF:  Pliego  General  de  Prescripciones 
Técnicas Tipo para los proyectos de plataforma) se busca evitar el ascenso de agua por capilaridad 
desde la cimentación del terraplén hasta las capas superiores de la plataforma, para ello, y siguiendo 
estas normativas, se propone lo siguiente, citado textualmente: 

Una  capa  de  hasta  2  m  de  espesor  formada  por  materiales  que  cumplan  las 
prescripciones de los materiales a utilizar en coronación con la condición adicional de 
tener un contenido de finos (materiales pasantes por el tamiz 0,080 UNE) inferior al 15%. 

De acuerdo con estos criterios, tendríamos la siguiente sección tipo. 

181 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
FIGURA 7 SECCIÓN TIPO DE TERRAPLÉN EN ZONAS ENCHARCABLES 

En consecuencia, en las zonas encharcables, la cota roja ha de ser 2.438 metros superior a la cota 
de referencia. 

5.8. TERRENO NATURAL 
5.8.1. Desmonte 
El desmonte es la acción de remover toda la vegetación existente dentro del derecho de vía o la 
zona de actuación de un proyecto de obra civil. En algunos casos el desmonte incluye la replantación 
de algunas especies de árboles y arbustos. El desmonte incluye desde la tala de árboles y arbustos 
hasta el corte de maleza, siembra, zacate, etc.  

5.8.2. Despalme 
El despalme es la acción de remover o quitar la tierra vegetal y el material superficial del terreno. El 
espesor del despalme estará definido por el estudio geotécnico en campo realizado, pudiendo ser 
este variable a lo largo de los tramos. 

Para los tramos se presentan las siguientes tablas donde se definen los espesores de despalme. 

TABLA 21 ESPESOR DE DESPALME DEL [ADMINISTRADOR] 

Cadenamiento Espesor 
despalme 
Inicial  Final 
(m) 
4119+000 4119+450 0.99

182 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Cadenamiento Espesor 
despalme 
Inicial  Final 
(m) 
4119+450 4119+880 0.0
4119+880 4120+400 0.30
4120+400 4120+900 0.70
4120+900 4121+400 0.10
4121+400 5000+000 0
5000+000 5000+510 0.20
5000+510  5001+390  0.30 

5001+390  5002+890  0.10 

5002+890 5003+400 0.20


5003+400 5003+900 0.30
5003+900 5004+400 0.65
5004+400 5004+890 0.20
5004+890 5005+400 0.30
5005+400 5005+770 0
5005+770 5006+320 0.20
5006+320 5006+800 0.10
5006+800 5007+300 0.15
5007+300 5007+800 0.30
5007+800 5008+300 0.80

5008+300  5009+300  0.20 

5009+300  5010+420  0.70 


5010+420 5010+640 0.20
5010+640  5011+600  0.10 
5011+600 5012+000 0.40
5012+000  5013+000  0.20 
5013+000 5013+310 0.15
5013+310 5013+800 0.30
5013+800 5014+095 0.10
5014+095 5014+309 0.40
5014+309 5014+755 0.30
5014+755 5014+951,44 0.4
5014+951,44 5014+960 0.2
5014+960  5016+400  0.40 

183 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Cadenamiento Espesor 
despalme 
Inicial  Final 
(m) 

5016+400 5016+560 0.50


5016+560  5017+400  0.30 

5017+400  5018+500  0.40 

5018+500 5019+000 0.35


5019+000 5019+384,77 0.40
5019+384,77 5019+670 0.15
5019+670 5020+050 0.40
5020+050 5020+400 0.30
5020+400 5020+900 0.50
5020+900 5021+400 0.30
5021+400 5022+110 0.45
5022+110 5022+360 0.10
5022+360 5022+830 0.23

5022+830  5024+700  0.30 

5024+700  5026+903  0.20 

5026+903 5027+129,72 0.40


5027+129,72 5027+357 0.20
5027+357  5028+100  0.40 
5028+100 5028+357 0.60
5028+357 5028+600 0.50

5028+600  5029+600  0.40 

5029+600 5030+289 0.60


5030+289 5030+800 0.20
5030+800 5031+300 0.30
5031+300 5031+800 0.40
5031+800 5031+882 0.15

184 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Cadenamiento Espesor 
despalme 
Inicial  Final 
(m) 
5031+882 5032+200 0.20
5032+200 5032+600 0.30

5032+600  5034+200  0.40 

5034+200 5034+346 0.30


5034+346 5034+700 0.50
5034+700 5035+200 0.20
5035+200 5035+700 0.50
5035+700 5036+245 0.30
5036+245 5036+390 0.40

5036+390  5037+763  0.30 

5037+763  5039+400  0.20 

5039+400  5041+500  0.30 

5041+500 5042+025 0.20


5042+025 5042+630 0.15
5042+630 5043+000 0.35
 

TABLA 22 ESPESOR DE DESPALME DEL 5071+500 – 6006+000 

Cadenamiento  Espesor 
despalme 
Inicial  Final  (m) 
5070+100  5070+517  0.15 
5070+517  5070+600  0.1 
5070+600  5071+100  0.2 
5071+100  5071+480  0.1 
5071+480  5072+100  0.15 
5072+100  5072+600  0 
5072+600  5072+700  0.8 
5072+700  6000+300  0.3 

185 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Cadenamiento  Espesor 
despalme 
Inicial  Final  (m) 
6000+300  6000+600  0.4 
6000+600  6000+800  0.2 

6000+800  6001+300  0.14 

6001+300  6001+800  0.4 


6001+800  6002+156  0.3 
6002+122  6002+156  0.1 

6002+156  6003+380  0.3 

6003+380  6004+400  0.16 

6004+400  6004+900  0.3 

TABLA 23 ESPESOR DE DESPALME DEL TRAMO 6017+000 AL 6030+000 

Cadenamiento  Espesor 
Inicial  Final  despalme 
6018+000  6018+100  0.48 

6018+100  6019+618  0.25 

6019+618  6020+060  0.43 


6020+060  6020+440  0.32 
6020+440  6020+520  0.4 
6020+520  6020+900  0.35 
6020+900  6021+375  0.00 
6021+375  6021+764  0.30 
6021+764  6022+100  0.20 
6022+100  6022+650  0.63 

6022+650  6023+645  0.20 

6023+645  6025+100  0.35 

186 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Cadenamiento  Espesor 
Inicial  Final  despalme 

6025+100  6025+100  0.30 

6025+100  6025+342  0.4 


6025+342  6025+600  0.20 
6025+600  6026+100  0.25 
6026+100  6026+500  0.55 
6026+500  6027+000  0.3 
6027+000  6027+500  0.2 
6027+500  6027+961  0.27 
6027+961  6028+150  0.35 
6028+150  6028+600  0.30 
6028+600  6028+707  0.4 
6028+707  6029+000  0.20 
6029+000  6029+269  0.15 
6029+269  6029+526  0.20 
6029+526  6030+000  0.8 
 

   

187 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TABLA 24 ESPESOR DE DESPALME DEL TRAMO 6036+800– 6067+000 

Cadenamiento  Espesor 
despalme 
Inicial  Final  (m) 
6037+000  6037+185  0.70 
6037+185  6037+680  0.60 
6037+680  6038+180  0.50 
6038+180  6038+685  0 
6038+685  6038+935  0.37 
6038+935  6039+495  0.30 
6039+495  6039+970  0.70 

6039+970  6040+680  0.16 

6040+680  6041+090  0.05 


6041+090  6041+530  0.2 
6041+530  6041+970  0.05 

6041+970  6042+789  0.325 

6042+789  6043+300  0.20 

6043+300  6043+790  0.40 


6043+790  6044+102  0.30 

6044+102  6044+680  0.40 

6044+680  6045+750  0.30 

6045+750  6046+190  0.60 


6046+190  6046+643  0 
6046+643  6046+670  0.40 

6046+670  6048+015  0.30 

6048+015  6048+111  0.10 


6048+111  6048+530  0.35 
6048+530  6049+007  0.05 
6049+007  6049+390  0.30 
6049+390  6049+507  0.05 
6049+507  6049+730  0.60 

188 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Cadenamiento  Espesor 
despalme 
Inicial  Final  (m) 
6049+730  6050+240  0.30 

6050+240  6051+155  0.40 

6051+155  6051+650  0.30 


6051+650  6052+155  0.70 
6052+155  6052+737  0.4 
6052+737  6052+910  0.30 
6052+910  6053+335  0.20 
6053+335  6053+735  0.1 

6053+735  6054+190  0.532 

6054+190  6055+142  0.20 

6055+142  6055+355  0.35 


6055+355  6055+955  0.20 
6055+955  6056+217  0 

6056+217  6057+860  0.20 

6057+860  6058+425  0.60 


6058+425  6058+935  0.40 
6058+935  6059+500  0.3 
6059+500  6060+070  0.05 
6060+070  6060+585  0.35 

6060+585  6061+595  0.22 

6061+595  6061+975  0.3 


6061+975  6062+410  0.08 
6062+410  6062+960  0.11 
6062+960  6063+180  0.25 
6063+180  6063+650  0.40 

6063+650  6064+565  0.30 

6064+565  6065+080  0.35 


6065+080  6065+625  0.3 

189 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Cadenamiento  Espesor 
despalme 
Inicial  Final  (m) 
6065+625  6066+100  0.4 
6066+100  6066+585  0.51 
6066+585  6067+595  0.05 

6067+595  6067+993  0.30 

6067+993  6066+585  0.35 

6. CURVA MASA, ACARREOS Y DESPERDICIOS 

6.1. CÁLCULOS DE PRÉSTAMOS Y DESPERDICIOS  
Una vez desarrollado el proyecto de plata, perfil y secciones transversales del tramo se procede a 
calcular los volúmenes de corte y terraplén requeridos  

La ordenada de la curva masa en una estación, como lo establece Manual de Proyecto Geométrico 
de Carreteras 2018, determinada es la suma algebraica de los volúmenes de terraplén y de corte; 
estos últimos afectados por su coeficiente de variabilidad volumétrica, considerados los volúmenes 
desde un origen hasta esa estación; se establece que los volúmenes de corte son positivos y los de 
terraplén son negativos. Estas ordenadas sirven para dibujar el diagrama de masas en un sistema 
de coordenadas rectangulares. La Figura 8  muestra un ejemplo  de la gráfica  de Ordenada Curva 
Masa  donde  se  procede  a  trazar  una  línea  compensadora  para  la  obtención  del  balance  de 
préstamos y compensaciones. 
 

190 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
FIGURA 8 EJEMPLO DE GRÁFICA DE ORDENADA CURVA MASA. MANUAL DE PROYECTO GEOMÉTRICO DE CARRETERAS 
2018 

Basándose en la información geotécnica se estableció que todo el material producto de corte no 
sería aprovechable para compensar los rellenos y formaciones de terraplén por lo que la no existe 
la necesidad de una línea compensadora. En conclusión, los diagramas obtenidos serán únicamente 
diagramas de acarreos y desperdicios. 

6.1.1. Cálculo de acarreos para terraplén 
 

A continuación, se presenta las siguientes tablas por subtramo con los cálculos de la curva masa 
para las terracerías. 

TABLA 25 CÁLCULO DE CURVA MASA DEL TRAMO DEL [ADMINISTRADOR] 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5000+000.00  0.00  10.07                    1,300,000.00


5000+020.00  0.00  22.98  0.00  33.05  10.00  0.00  0.00  330.46  1,299,669.54
5000+040.00  0.00  15.34  0.00  38.31  10.00  0.00  0.00  383.13  1,299,286.41
5000+060.00  0.00  24.69  0.00  40.03  10.00  0.00  0.00  400.28  1,298,886.13
5000+080.00  0.00  29.70  0.00  54.39  10.00  0.00  0.00  543.87  1,298,342.26
5000+100.00  0.00  27.99  0.00  57.69  10.00  0.00  0.00  576.87  1,297,765.39
5000+120.00  0.00  27.52  0.00  55.51  10.00  0.00  0.00  555.11  1,297,210.28
5000+140.00  0.00  25.55  0.00  53.07  10.00  0.00  0.00  530.69  1,296,679.59

191 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5000+160.00  0.00  22.48  0.00  48.03  10.00  0.00  0.00  480.27  1,296,199.32
5000+180.00  0.00  27.87  0.00  50.35  10.00  0.00  0.00  503.45  1,295,695.87
5000+200.00  0.00  30.16  0.00  58.02  10.00  0.00  0.00  580.24  1,295,115.63
5000+220.00  0.00  31.51  0.00  61.66  10.00  0.00  0.00  616.63  1,294,499.00
5000+240.00  0.00  33.58  0.00  65.08  10.00  0.00  0.00  650.82  1,293,848.18
5000+260.00  0.00  40.93  0.00  74.51  10.00  0.00  0.00  745.08  1,293,103.10
5000+280.00  0.00  46.73  0.00  87.66  10.00  0.00  0.00  876.64  1,292,226.46
5000+300.00  0.00  33.53  0.00  80.26  10.00  0.00  0.00  802.62  1,291,423.84
5000+320.00  0.00  28.24  0.00  61.77  10.00  0.00  0.00  617.66  1,290,806.18
5000+340.00  0.00  30.39  0.00  58.63  10.00  0.00  0.00  586.29  1,290,219.89
5000+360.00  0.00  31.30  0.00  61.69  10.00  0.00  0.00  616.89  1,289,603.00
5000+380.00  0.00  26.72  0.00  58.02  10.00  0.00  0.00  580.15  1,289,022.85
5000+400.00  0.00  17.02  0.00  43.74  10.00  0.00  0.00  437.39  1,288,585.46
5000+420.00  0.00  25.41  0.00  42.43  10.00  0.00  0.00  424.32  1,288,161.14
5000+440.00  0.00  32.43  0.00  57.84  10.00  0.00  0.00  578.44  1,287,582.70
5000+440.00  0.00  31.27  0.00  63.70  0.00  0.00  0.00  0.00  1,287,582.70
5000+460.00  0.00  15.14  0.00  46.41  10.00  0.00  0.00  464.05  1,287,118.65
5000+480.00  0.00  18.85  0.00  33.99  10.00  0.00  0.00  339.90  1,286,778.75
5000+500.00  0.00  18.44  0.00  37.29  10.00  0.00  0.00  372.87  1,286,405.88
5000+520.00  0.00  24.90  0.00  43.34  10.00  0.00  0.00  433.38  1,285,972.50
5000+540.00  0.00  10.76  0.00  35.66  10.00  0.00  0.00  356.58  1,285,615.92
5000+560.00  0.00  13.12  0.00  23.88  10.00  0.00  0.00  238.76  1,285,377.16
5000+580.00  0.71  3.31  0.71  16.43  10.00  7.06  9.18  164.31  1,285,222.03
5000+600.00  0.00  12.83  0.71  16.14  10.00  7.06  9.18  161.43  1,285,069.78
5000+620.00  0.00  13.23  0.00  26.06  10.00  0.00  0.00  260.58  1,284,809.20
5000+640.00  0.00  13.26  0.00  26.49  10.00  0.00  0.00  264.91  1,284,544.29
5000+660.00  0.00  22.85  0.00  36.12  10.00  0.00  0.00  361.16  1,284,183.13
5000+680.00  0.00  28.52  0.00  51.37  10.00  0.00  0.00  513.72  1,283,669.41
5000+700.00  0.00  32.04  0.00  60.56  10.00  0.00  0.00  605.62  1,283,063.79
5000+720.00  0.00  35.28  0.00  67.32  10.00  0.00  0.00  673.24  1,282,390.55
5000+740.00  0.00  39.89  0.00  75.17  10.00  0.00  0.00  751.68  1,281,638.87
5000+760.00  0.00  44.22  0.00  84.11  10.00  0.00  0.00  841.09  1,280,797.78
5000+780.00  0.00  45.51  0.00  89.74  10.00  0.00  0.00  897.36  1,279,900.42
5000+800.00  0.00  43.21  0.00  88.72  10.00  0.00  0.00  887.23  1,279,013.19
5000+820.00  0.00  38.63  0.00  81.84  10.00  0.00  0.00  818.39  1,278,194.80
5000+840.00  0.00  30.27  0.00  68.90  10.00  0.00  0.00  688.98  1,277,505.82
5000+860.00  0.00  40.67  0.00  70.94  10.00  0.00  0.00  709.43  1,276,796.39
5000+880.00  0.00  23.80  0.00  64.47  10.00  0.00  0.00  644.71  1,276,151.68
5000+900.00  0.00  7.96  0.00  31.75  10.00  0.00  0.00  317.54  1,275,834.14
5000+920.00  0.00  13.60  0.00  21.55  10.00  0.00  0.00  215.52  1,275,618.62
5000+940.00  0.00  11.90  0.00  25.50  10.00  0.00  0.00  254.98  1,275,363.64
5000+960.00  0.00  18.37  0.00  30.27  10.00  0.00  0.00  302.73  1,275,060.91
5000+960.00  0.00  16.30  0.00  34.67  0.00  0.00  0.00  0.00  1,275,060.91
5000+980.00  0.00  6.68  0.00  22.98  10.00  0.00  0.00  229.79  1,274,831.12
5001+000.00  0.00  5.85  0.00  12.52  10.00  0.00  0.00  125.22  1,274,705.90

192 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5001+020.00  0.00  9.69  0.00  15.54  10.00  0.00  0.00  155.39  1,274,550.51
5001+040.00  0.00  12.96  0.00  22.65  10.00  0.00  0.00  226.49  1,274,324.02
5001+060.00  0.00  13.19  0.00  26.14  10.00  0.00  0.00  261.43  1,274,062.59
5001+080.00  0.00  15.69  0.00  28.88  10.00  0.00  0.00  288.75  1,273,773.84
5001+100.00  0.00  13.84  0.00  29.53  10.00  0.00  0.00  295.31  1,273,478.53
5001+120.00  0.00  25.68  0.00  39.53  10.00  0.00  0.00  395.26  1,273,083.27
5001+140.00  0.00  26.31  0.00  51.99  10.00  0.00  0.00  519.93  1,272,563.34
5001+160.00  0.00  23.54  0.00  49.85  10.00  0.00  0.00  498.53  1,272,064.81
5001+180.00  0.00  13.94  0.00  37.48  10.00  0.00  0.00  374.84  1,271,689.97
5001+200.00  0.00  8.16  0.00  22.11  10.00  0.00  0.00  221.05  1,271,468.92
5001+220.00  0.00  26.63  0.00  34.79  10.00  0.00  0.00  347.93  1,271,120.99
5001+240.00  0.00  27.75  0.00  54.38  10.00  0.00  0.00  543.77  1,270,577.22
5001+260.00  0.00  16.10  0.00  43.84  10.00  0.00  0.00  438.44  1,270,138.78
5001+280.00  0.00  8.60  0.00  24.70  10.00  0.00  0.00  246.99  1,269,891.79
5001+300.00  0.00  5.08  0.00  13.68  10.00  0.00  0.00  136.84  1,269,754.95
5001+320.00  0.00  13.29  0.00  18.37  10.00  0.00  0.00  183.71  1,269,571.24
5001+340.00  0.00  13.03  0.00  26.32  10.00  0.00  0.00  263.15  1,269,308.09
5001+360.00  0.00  18.80  0.00  31.83  10.00  0.00  0.00  318.25  1,268,989.84
5001+380.00  0.00  17.32  0.00  36.12  10.00  0.00  0.00  361.23  1,268,628.61
5001+400.00  0.00  16.43  0.00  33.76  10.00  0.00  0.00  337.58  1,268,291.03
5001+420.00  0.00  13.82  0.00  30.25  10.00  0.00  0.00  302.50  1,267,988.53
5001+440.00  0.00  15.06  0.00  28.88  10.00  0.00  0.00  288.75  1,267,699.78
5001+460.00  0.00  13.28  0.00  28.34  10.00  0.00  0.00  283.35  1,267,416.43
5001+480.00  0.00  10.87  0.00  24.15  10.00  0.00  0.00  241.50  1,267,174.93
5001+500.00  0.00  10.30  0.00  21.17  10.00  0.00  0.00  211.74  1,266,963.19
5001+520.00  1.45  4.44  1.45  14.74  10.00  14.48  18.82  147.35  1,266,834.66
5001+540.00  0.00  4.69  1.45  9.12  10.00  14.48  18.82  91.23  1,266,762.25
5001+560.00  0.98  3.79  0.98  8.47  10.00  9.81  12.75  84.74  1,266,690.27
5001+580.00  1.09  0.92  2.07  4.71  10.00  20.74  26.96  47.07  1,266,670.16
5001+600.00  0.00  6.04  1.09  6.96  10.00  10.93  14.21  69.59  1,266,614.78
5001+620.00  0.00  10.48  0.00  16.52  10.00  0.00  0.00  165.20  1,266,449.58
5001+640.00  0.00  10.92  0.00  21.40  10.00  0.00  0.00  214.04  1,266,235.54
5001+660.00  0.00  12.85  0.00  23.77  10.00  0.00  0.00  237.74  1,265,997.80
5001+680.00  0.00  12.91  0.00  25.76  10.00  0.00  0.00  257.63  1,265,740.17
5001+700.00  0.00  12.75  0.00  25.66  10.00  0.00  0.00  256.61  1,265,483.56
5001+720.00  0.00  6.98  0.00  19.73  10.00  0.00  0.00  197.28  1,265,286.28
5001+740.00  0.00  8.20  0.00  15.18  10.00  0.00  0.00  151.78  1,265,134.50
5001+760.00  3.14  6.06  3.14  14.26  10.00  31.36  40.77  142.61  1,265,032.66
5001+780.00  0.00  3.19  3.14  9.25  10.00  31.36  40.77  92.52  1,264,980.90
5001+800.00  0.00  9.85  0.00  13.04  10.00  0.00  0.00  130.38  1,264,850.52
5001+820.00  0.00  12.00  0.00  21.85  10.00  0.00  0.00  218.47  1,264,632.05
5001+840.00  0.00  11.22  0.00  23.22  10.00  0.00  0.00  232.19  1,264,399.86
5001+860.00  0.00  9.21  0.00  20.43  10.00  0.00  0.00  204.28  1,264,195.58
5001+880.00  5.69  1.35  5.69  10.56  10.00  56.89  73.96  105.55  1,264,163.99
5001+900.00  2.35  3.77  8.04  5.12  10.00  80.36  104.47  51.18  1,264,217.28

193 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5001+920.00  0.00  9.04  2.35  12.81  10.00  23.47  30.51  128.08  1,264,119.71
5001+940.00  0.88  3.60  0.88  12.63  10.00  8.81  11.45  126.34  1,264,004.82
5001+960.00  0.82  3.59  1.70  7.19  10.00  16.98  22.07  71.89  1,263,955.01
5001+980.00  0.00  8.08  0.82  11.67  10.00  8.17  10.62  116.69  1,263,848.94
5002+000.00  0.00  5.88  0.00  13.96  10.00  0.00  0.00  139.55  1,263,709.39
5002+020.00  0.00  7.76  0.00  13.64  10.00  0.00  0.00  136.38  1,263,573.01
5002+040.00  0.00  6.64  0.00  14.40  10.00  0.00  0.00  143.97  1,263,429.04
5002+060.00  0.00  4.80  0.00  11.43  10.00  0.00  0.00  114.32  1,263,314.72
5002+080.00  0.00  7.87  0.00  12.67  10.00  0.00  0.00  126.69  1,263,188.03
5002+100.00  0.00  12.13  0.00  20.01  10.00  0.00  0.00  200.07  1,262,987.96
5002+120.00  0.00  10.23  0.00  22.37  10.00  0.00  0.00  223.68  1,262,764.28
5002+140.00  0.00  6.10  0.00  16.34  10.00  0.00  0.00  163.35  1,262,600.93
5002+160.00  0.00  10.27  0.00  16.37  10.00  0.00  0.00  163.74  1,262,437.19
5002+180.00  0.00  8.83  0.00  19.11  10.00  0.00  0.00  191.07  1,262,246.12
5002+200.00  0.00  11.08  0.00  19.91  10.00  0.00  0.00  199.10  1,262,047.02
5002+220.00  0.00  8.02  0.00  19.10  10.00  0.00  0.00  191.00  1,261,856.02
5002+240.00  0.91  2.40  0.91  10.43  10.00  9.08  11.80  104.26  1,261,763.56
5002+260.00  0.79  1.87  1.70  4.27  10.00  17.00  22.10  42.67  1,261,742.99
5002+280.00  0.97  1.18  1.76  3.05  10.00  17.63  22.92  30.45  1,261,735.46
5002+300.00  1.26  3.18  2.23  4.36  10.00  22.34  29.04  43.63  1,261,720.87
5002+320.00  0.00  9.64  1.26  12.82  10.00  12.63  16.42  128.18  1,261,609.11
5002+340.00  0.00  12.07  0.00  21.70  10.00  0.00  0.00  217.03  1,261,392.08
5002+360.00  0.00  11.92  0.00  23.98  10.00  0.00  0.00  239.84  1,261,152.24
5002+380.00  0.00  13.28  0.00  25.19  10.00  0.00  0.00  251.93  1,260,900.31
5002+400.00  0.00  14.93  0.00  28.21  10.00  0.00  0.00  282.11  1,260,618.20
5002+420.00  0.00  10.23  0.00  25.17  10.00  0.00  0.00  251.67  1,260,366.53
5002+440.00  0.00  8.58  0.00  18.81  10.00  0.00  0.00  188.09  1,260,178.44
5002+460.00  0.76  2.72  0.76  11.30  10.00  7.60  9.88  113.00  1,260,075.32
5002+480.00  0.68  2.15  1.44  4.87  10.00  14.38  18.69  48.71  1,260,045.31
5002+500.00  0.00  9.57  0.68  11.71  10.00  6.78  8.81  117.13  1,259,936.99
5002+520.00  0.00  12.61  0.00  22.18  10.00  0.00  0.00  221.80  1,259,715.19
5002+540.00  0.00  11.76  0.00  24.37  10.00  0.00  0.00  243.70  1,259,471.49
5002+560.00  0.00  8.33  0.00  20.09  10.00  0.00  0.00  200.90  1,259,270.59
5002+580.00  0.00  7.66  0.00  15.99  10.00  0.00  0.00  159.91  1,259,110.68
5002+600.00  0.00  11.76  0.00  19.42  10.00  0.00  0.00  194.16  1,258,916.52
5002+620.00  0.00  9.96  0.00  21.72  10.00  0.00  0.00  217.16  1,258,699.36
5002+640.00  0.00  4.32  0.00  14.28  10.00  0.00  0.00  142.81  1,258,556.55
5002+660.00  0.00  9.13  0.00  13.46  10.00  0.00  0.00  134.56  1,258,421.99
5002+680.00  0.00  6.25  0.00  15.38  10.00  0.00  0.00  153.81  1,258,268.18
5002+700.00  0.90  2.94  0.90  9.19  10.00  8.99  11.69  91.92  1,258,187.95
5002+720.00  0.00  7.37  0.90  10.31  10.00  8.99  11.69  103.10  1,258,096.53
5002+740.00  0.00  4.05  0.00  11.41  10.00  0.00  0.00  114.13  1,257,982.40
5002+745.00  0.00  4.30  0.00  8.35  2.50  0.00  0.00  20.87  1,257,961.53
5002+745.00  0.00  4.90  0.00  9.20  0.00  0.00  0.00  0.00  1,257,961.53
5002+760.00  0.00  5.65  0.00  10.55  7.50  0.00  0.00  79.11  1,257,882.42

194 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5002+780.00  0.00  5.29  0.00  10.94  10.00  0.00  0.00  109.40  1,257,773.02
5002+800.00  0.00  7.12  0.00  12.41  10.00  0.00  0.00  124.09  1,257,648.93
5002+820.00  0.00  8.76  0.00  15.89  10.00  0.00  0.00  158.85  1,257,490.08
5002+840.00  0.00  8.49  0.00  17.25  10.00  0.00  0.00  172.53  1,257,317.55
5002+860.00  0.00  9.24  0.00  17.73  10.00  0.00  0.00  177.25  1,257,140.30
5002+880.00  0.00  8.88  0.00  18.12  10.00  0.00  0.00  181.19  1,256,959.11
5002+900.00  0.00  12.42  0.00  21.30  10.00  0.00  0.00  213.03  1,256,746.08
5002+920.00  0.00  13.65  0.00  26.07  10.00  0.00  0.00  260.73  1,256,485.35
5002+940.00  0.00  8.30  0.00  21.95  10.00  0.00  0.00  219.53  1,256,265.82
5002+960.00  0.00  11.14  0.00  19.44  10.00  0.00  0.00  194.41  1,256,071.41
5002+980.00  0.00  6.41  0.00  17.55  10.00  0.00  0.00  175.49  1,255,895.92
5003+000.00  0.00  4.57  0.00  10.98  10.00  0.00  0.00  109.76  1,255,786.16
5003+020.00  0.00  3.96  0.00  8.53  10.00  0.00  0.00  85.33  1,255,700.83
5003+040.00  0.00  7.11  0.00  11.08  10.00  0.00  0.00  110.78  1,255,590.05
5003+060.00  0.00  8.88  0.00  15.99  10.00  0.00  0.00  159.91  1,255,430.14
5003+080.00  0.00  8.68  0.00  17.55  10.00  0.00  0.00  175.52  1,255,254.62
5003+100.00  0.00  11.19  0.00  19.86  10.00  0.00  0.00  198.60  1,255,056.02
5003+120.00  0.00  11.25  0.00  22.43  10.00  0.00  0.00  224.33  1,254,831.69
5003+140.00  0.00  11.18  0.00  22.43  10.00  0.00  0.00  224.29  1,254,607.40
5003+160.00  0.00  11.03  0.00  22.21  10.00  0.00  0.00  222.07  1,254,385.33
5003+180.00  0.00  12.19  0.00  23.22  10.00  0.00  0.00  232.19  1,254,153.14
5003+200.00  0.00  13.28  0.00  25.47  10.00  0.00  0.00  254.68  1,253,898.46
5003+220.00  0.00  14.16  0.00  27.44  10.00  0.00  0.00  274.35  1,253,624.11
5003+240.00  0.00  14.36  0.00  28.52  10.00  0.00  0.00  285.17  1,253,338.94
5003+260.00  0.00  13.00  0.00  27.36  10.00  0.00  0.00  273.55  1,253,065.39
5003+280.00  0.00  14.72  0.00  27.72  10.00  0.00  0.00  277.15  1,252,788.24
5003+300.00  0.00  16.78  0.00  31.50  10.00  0.00  0.00  315.01  1,252,473.23
5003+320.00  0.00  21.35  0.00  38.13  10.00  0.00  0.00  381.29  1,252,091.94
5003+340.00  0.00  21.91  0.00  43.26  10.00  0.00  0.00  432.57  1,251,659.37
5003+360.00  0.00  26.21  0.00  48.13  10.00  0.00  0.00  481.26  1,251,178.11
5003+380.00  0.00  27.18  0.00  53.39  10.00  0.00  0.00  533.91  1,250,644.20
5003+400.00  0.00  24.85  0.00  52.03  10.00  0.00  0.00  520.29  1,250,123.91
5003+420.00  0.00  26.16  0.00  51.01  10.00  0.00  0.00  510.12  1,249,613.79
5003+440.00  0.00  34.20  0.00  60.36  10.00  0.00  0.00  603.58  1,249,010.21
5003+460.00  0.00  37.33  0.00  71.53  10.00  0.00  0.00  715.31  1,248,294.90
5003+480.00  0.00  38.94  0.00  76.27  10.00  0.00  0.00  762.74  1,247,532.16
5003+490.00  0.00  38.27  0.00  77.22  5.00  0.00  0.00  386.08  1,247,146.09
5003+490.00  0.00  43.36  0.00  81.63  0.00  0.00  0.00  0.00  1,247,146.09
5003+500.00  0.00  42.51  0.00  85.86  5.00  0.00  0.00  429.30  1,246,716.79
5003+520.00  0.00  45.76  0.00  88.27  10.00  0.00  0.00  882.67  1,245,834.12
5003+540.00  0.00  45.80  0.00  91.56  10.00  0.00  0.00  915.60  1,244,918.52
5003+560.00  0.00  44.53  0.00  90.33  10.00  0.00  0.00  903.25  1,244,015.27
5003+580.00  0.00  35.39  0.00  79.92  10.00  0.00  0.00  799.15  1,243,216.12
5003+600.00  0.00  32.97  0.00  68.35  10.00  0.00  0.00  683.53  1,242,532.59
5003+620.00  0.00  33.65  0.00  66.62  10.00  0.00  0.00  666.17  1,241,866.42

195 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5003+640.00  0.00  28.78  0.00  62.44  10.00  0.00  0.00  624.36  1,241,242.06
5003+660.00  0.00  28.60  0.00  57.39  10.00  0.00  0.00  573.88  1,240,668.18
5003+680.00  0.00  27.06  0.00  55.67  10.00  0.00  0.00  556.67  1,240,111.51
5003+700.00  0.00  28.58  0.00  55.65  10.00  0.00  0.00  556.47  1,239,555.04
5003+720.00  0.00  24.08  0.00  52.67  10.00  0.00  0.00  526.65  1,239,028.39
5003+740.00  0.00  23.29  0.00  47.37  10.00  0.00  0.00  473.71  1,238,554.68
5003+760.00  0.00  21.56  0.00  44.85  10.00  0.00  0.00  448.50  1,238,106.18
5003+780.00  0.00  17.31  0.00  38.87  10.00  0.00  0.00  388.67  1,237,717.51
5003+800.00  0.00  13.32  0.00  30.63  10.00  0.00  0.00  306.28  1,237,411.23
5003+820.00  0.00  13.83  0.00  27.15  10.00  0.00  0.00  271.52  1,237,139.71
5003+840.00  0.00  20.29  0.00  34.12  10.00  0.00  0.00  341.24  1,236,798.47
5003+860.00  0.00  20.95  0.00  41.24  10.00  0.00  0.00  412.41  1,236,386.06
5003+880.00  0.00  18.44  0.00  39.39  10.00  0.00  0.00  393.90  1,235,992.16
5003+900.00  0.00  10.53  0.00  28.97  10.00  0.00  0.00  289.73  1,235,702.43
5003+920.00  0.00  10.89  0.00  21.43  10.00  0.00  0.00  214.25  1,235,488.18
5003+940.00  0.00  13.03  0.00  23.92  10.00  0.00  0.00  239.21  1,235,248.97
5003+960.00  0.00  13.86  0.00  26.89  10.00  0.00  0.00  268.91  1,234,980.06
5003+980.00  0.00  12.64  0.00  26.50  10.00  0.00  0.00  265.01  1,234,715.05
5004+000.00  0.00  10.43  0.00  23.07  10.00  0.00  0.00  230.65  1,234,484.40
5004+020.00  0.00  6.37  0.00  16.79  10.00  0.00  0.00  167.93  1,234,316.47
5004+040.00  0.18  5.84  0.18  12.20  10.00  1.78  2.31  122.03  1,234,196.75
5004+060.00  0.00  8.43  0.18  14.27  10.00  1.78  2.31  142.72  1,234,056.34
5004+080.00  0.39  4.53  0.39  12.96  10.00  3.91  5.08  129.64  1,233,931.79
5004+100.00  0.50  4.77  0.89  9.30  10.00  8.87  11.53  92.97  1,233,850.35
5004+120.00  0.38  5.79  0.88  10.55  10.00  8.75  11.38  105.54  1,233,756.18
5004+140.00  0.77  3.19  1.15  8.97  10.00  11.51  14.96  89.73  1,233,681.42
5004+160.00  0.33  6.18  1.11  9.37  10.00  11.05  14.37  93.68  1,233,602.10
5004+180.00  0.17  6.36  0.50  12.54  10.00  4.98  6.47  125.38  1,233,483.20
5004+200.00  0.00  9.56  0.17  15.92  10.00  1.65  2.15  159.17  1,233,326.17
5004+220.00  0.00  9.81  0.00  19.37  10.00  0.00  0.00  193.67  1,233,132.50
5004+240.00  0.00  9.60  0.00  19.41  10.00  0.00  0.00  194.10  1,232,938.40
5004+260.00  0.00  8.82  0.00  18.42  10.00  0.00  0.00  184.21  1,232,754.19
5004+280.00  0.00  7.82  0.00  16.63  10.00  0.00  0.00  166.32  1,232,587.87
5004+300.00  0.28  7.66  0.28  15.47  10.00  2.80  3.64  154.73  1,232,436.78
5004+310.00  0.25  7.54  0.53  15.20  5.00  2.65  3.45  75.99  1,232,364.24
5004+310.00  0.32  6.92  0.57  14.46  0.00  0.00  0.00  0.00  1,232,364.24
5004+320.00  0.29  6.77  0.61  13.69  5.00  3.06  3.97  68.46  1,232,299.75
5004+340.00  0.45  9.36  0.74  16.13  10.00  7.41  9.63  161.32  1,232,148.07
5004+360.00  0.00  11.02  0.45  20.39  10.00  4.48  5.82  203.86  1,231,950.03
5004+380.00  0.00  6.76  0.00  17.78  10.00  0.00  0.00  177.77  1,231,772.26
5004+400.00  0.25  6.44  0.25  13.20  10.00  2.49  3.24  131.99  1,231,643.51
5004+420.00  0.00  14.26  0.25  20.70  10.00  2.49  3.24  207.02  1,231,439.72
5004+440.00  0.00  11.59  0.00  25.85  10.00  0.00  0.00  258.47  1,231,181.25
5004+460.00  0.15  5.71  0.15  17.29  10.00  1.48  1.92  172.94  1,231,010.24
5004+480.00  0.00  9.87  0.15  15.58  10.00  1.48  1.92  155.75  1,230,856.41

196 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5004+490.00  0.00  9.27  0.00  19.14  5.00  0.00  0.00  95.71  1,230,760.71
5004+490.00  0.00  6.56  0.00  15.83  0.00  0.00  0.00  0.00  1,230,760.71
5004+500.00  0.91  5.88  0.91  12.44  5.00  4.54  5.90  62.19  1,230,704.41
5004+520.00  0.00  7.52  0.91  13.41  10.00  9.07  11.79  134.06  1,230,582.14
5004+540.00  0.00  11.08  0.00  18.60  10.00  0.00  0.00  186.04  1,230,396.10
5004+560.00  0.00  12.03  0.00  23.11  10.00  0.00  0.00  231.11  1,230,164.99
5004+580.00  0.00  12.62  0.00  24.65  10.00  0.00  0.00  246.54  1,229,918.45
5004+600.00  0.00  13.21  0.00  25.83  10.00  0.00  0.00  258.31  1,229,660.14
5004+620.00  0.00  14.09  0.00  27.29  10.00  0.00  0.00  272.93  1,229,387.21
5004+640.00  0.00  12.27  0.00  26.35  10.00  0.00  0.00  263.52  1,229,123.69
5004+660.00  0.00  8.33  0.00  20.60  10.00  0.00  0.00  206.00  1,228,917.69
5004+680.00  0.00  11.71  0.00  20.04  10.00  0.00  0.00  200.39  1,228,717.30
5004+700.00  0.00  17.72  0.00  29.43  10.00  0.00  0.00  294.28  1,228,423.02
5004+720.00  0.00  18.52  0.00  36.24  10.00  0.00  0.00  362.41  1,228,060.61
5004+740.00  0.00  16.20  0.00  34.72  10.00  0.00  0.00  347.18  1,227,713.43
5004+760.00  0.00  14.64  0.00  30.84  10.00  0.00  0.00  308.37  1,227,405.06
5004+780.00  0.00  13.11  0.00  27.75  10.00  0.00  0.00  277.52  1,227,127.54
5004+800.00  0.00  11.40  0.00  24.51  10.00  0.00  0.00  245.12  1,226,882.42
5004+800.00  0.00  12.06  0.00  23.45  0.00  0.00  0.00  0.00  1,226,882.42
5004+820.00  0.00  11.05  0.00  23.10  10.00  0.00  0.00  231.04  1,226,651.38
5004+840.00  0.00  10.41  0.00  21.46  10.00  0.00  0.00  214.57  1,226,436.81
5004+860.00  0.00  11.96  0.00  22.37  10.00  0.00  0.00  223.68  1,226,213.13
5004+880.00  0.00  13.83  0.00  25.79  10.00  0.00  0.00  257.89  1,225,955.24
5004+900.00  0.00  14.30  0.00  28.13  10.00  0.00  0.00  281.28  1,225,673.96
5004+920.00  0.00  13.68  0.00  27.98  10.00  0.00  0.00  279.81  1,225,394.15
5004+940.00  0.00  12.05  0.00  25.73  10.00  0.00  0.00  257.32  1,225,136.83
5004+960.00  0.00  11.56  0.00  23.61  10.00  0.00  0.00  236.14  1,224,900.69
5004+980.00  0.00  21.49  0.00  33.05  10.00  0.00  0.00  330.50  1,224,570.19
5004+980.00  0.00  22.24  0.00  43.72  0.00  0.00  0.00  0.00  1,224,570.19
5005+000.00  0.00  22.34  0.00  44.57  10.00  0.00  0.00  445.74  1,224,124.45
5005+020.00  0.00  22.49  0.00  44.83  10.00  0.00  0.00  448.27  1,223,676.18
5005+040.00  0.00  21.05  0.00  43.54  10.00  0.00  0.00  435.37  1,223,240.81
5005+060.00  0.00  19.72  0.00  40.77  10.00  0.00  0.00  407.66  1,222,833.15
5005+080.00  0.00  16.93  0.00  36.65  10.00  0.00  0.00  366.46  1,222,466.69
5005+100.00  0.00  13.14  0.00  30.07  10.00  0.00  0.00  300.67  1,222,166.02
5005+120.00  0.00  10.20  0.00  23.34  10.00  0.00  0.00  233.36  1,221,932.66
5005+140.00  0.00  10.62  0.00  20.82  10.00  0.00  0.00  208.21  1,221,724.45
5005+160.00  0.00  10.71  0.00  21.33  10.00  0.00  0.00  213.29  1,221,511.16
5005+180.00  0.00  8.85  0.00  19.55  10.00  0.00  0.00  195.50  1,221,315.66
5005+200.00  0.00  16.07  0.00  24.92  10.00  0.00  0.00  249.19  1,221,066.47
5005+220.00  0.00  17.19  0.00  33.27  10.00  0.00  0.00  332.67  1,220,733.80
5005+240.00  0.00  13.90  0.00  31.10  10.00  0.00  0.00  310.96  1,220,422.84
5005+260.00  0.00  9.34  0.00  23.25  10.00  0.00  0.00  232.47  1,220,190.37
5005+280.00  0.00  6.56  0.00  15.91  10.00  0.00  0.00  159.08  1,220,031.29
5005+300.00  0.00  8.86  0.00  15.42  10.00  0.00  0.00  154.21  1,219,877.08

197 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5005+320.00  0.00  9.05  0.00  17.91  10.00  0.00  0.00  179.11  1,219,697.97
5005+340.00  0.00  10.37  0.00  19.43  10.00  0.00  0.00  194.25  1,219,503.72
5005+360.00  0.00  8.09  0.00  18.46  10.00  0.00  0.00  184.61  1,219,319.11
5005+380.00  0.00  7.38  0.00  15.47  10.00  0.00  0.00  154.74  1,219,164.37
5005+400.00  0.44  7.21  0.44  14.59  10.00  4.38  5.69  145.93  1,219,024.14
5005+420.00  0.46  6.39  0.90  13.60  10.00  8.98  11.67  135.96  1,218,899.85
5005+440.00  0.00  5.75  0.46  12.13  10.00  4.60  5.98  121.32  1,218,784.51
5005+460.00  0.00  9.33  0.00  15.07  10.00  0.00  0.00  150.74  1,218,633.77
5005+480.00  0.00  13.44  0.00  22.76  10.00  0.00  0.00  227.64  1,218,406.13
5005+500.00  0.00  17.50  0.00  30.94  10.00  0.00  0.00  309.39  1,218,096.74
5005+520.00  0.00  22.16  0.00  39.67  10.00  0.00  0.00  396.66  1,217,700.08
5005+540.00  0.00  26.06  0.00  48.22  10.00  0.00  0.00  482.17  1,217,217.91
5005+560.00  0.00  18.19  0.00  44.25  10.00  0.00  0.00  442.47  1,216,775.44
5005+580.00  0.00  25.36  0.00  43.56  10.00  0.00  0.00  435.55  1,216,339.89
5005+600.00  0.00  30.51  0.00  55.88  10.00  0.00  0.00  558.75  1,215,781.14
5005+620.00  0.00  30.98  0.00  61.49  10.00  0.00  0.00  614.93  1,215,166.21
5005+640.00  0.00  29.36  0.00  60.34  10.00  0.00  0.00  603.37  1,214,562.84
5005+660.00  0.00  31.81  0.00  61.17  10.00  0.00  0.00  611.70  1,213,951.14
5005+680.00  0.00  36.62  0.00  68.44  10.00  0.00  0.00  684.36  1,213,266.78
5005+680.00  0.00  33.16  0.00  69.78  0.00  0.00  0.00  0.00  1,213,266.78
5005+700.00  0.00  36.38  0.00  69.53  10.00  0.00  0.00  695.34  1,212,571.44
5005+720.00  0.00  35.85  0.00  72.23  10.00  0.00  0.00  722.28  1,211,849.16
5005+740.00  0.00  34.35  0.00  70.20  10.00  0.00  0.00  702.00  1,211,147.16
5005+760.00  0.00  39.09  0.00  73.44  10.00  0.00  0.00  734.42  1,210,412.74
5005+780.00  0.00  44.24  0.00  83.33  10.00  0.00  0.00  833.31  1,209,579.43
5005+800.00  0.00  40.15  0.00  84.39  10.00  0.00  0.00  843.93  1,208,735.50
5005+820.00  0.00  33.13  0.00  73.28  10.00  0.00  0.00  732.82  1,208,002.68
5005+840.00  0.00  32.62  0.00  65.75  10.00  0.00  0.00  657.50  1,207,345.18
5005+860.00  0.00  33.26  0.00  65.88  10.00  0.00  0.00  658.84  1,206,686.34
5005+880.00  0.00  32.30  0.00  65.56  10.00  0.00  0.00  655.59  1,206,030.75
5005+890.00  0.00  32.56  0.00  64.85  5.00  0.00  0.00  324.26  1,205,706.49
5005+890.00  0.00  33.43  0.00  65.99  0.00  0.00  0.00  0.00  1,205,706.49
5005+900.00  0.00  33.71  0.00  67.14  5.00  0.00  0.00  335.71  1,205,370.79
5005+920.00  0.00  33.84  0.00  67.56  10.00  0.00  0.00  675.55  1,204,695.24
5005+940.00  0.00  33.90  0.00  67.74  10.00  0.00  0.00  677.43  1,204,017.81
5005+960.00  0.00  35.06  0.00  68.96  10.00  0.00  0.00  689.61  1,203,328.20
5005+980.00  0.00  35.29  0.00  70.35  10.00  0.00  0.00  703.47  1,202,624.73
5006+000.00  0.00  36.60  0.00  71.89  10.00  0.00  0.00  718.88  1,201,905.85
5006+020.00  0.00  35.85  0.00  72.46  10.00  0.00  0.00  724.57  1,201,181.28
5006+040.00  0.00  31.83  0.00  67.68  10.00  0.00  0.00  676.79  1,200,504.49
5006+060.00  0.00  29.14  0.00  60.96  10.00  0.00  0.00  609.61  1,199,894.88
5006+080.00  0.00  27.99  0.00  57.13  10.00  0.00  0.00  571.30  1,199,323.58
5006+100.00  0.00  24.02  0.00  52.02  10.00  0.00  0.00  520.18  1,198,803.40
5006+120.00  0.00  18.49  0.00  42.52  10.00  0.00  0.00  425.17  1,198,378.23
5006+140.00  0.00  18.16  0.00  36.66  10.00  0.00  0.00  366.57  1,198,011.66

198 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5006+160.00  0.00  14.81  0.00  32.98  10.00  0.00  0.00  329.78  1,197,681.88
5006+180.00  0.00  16.89  0.00  31.70  10.00  0.00  0.00  317.04  1,197,364.84
5006+200.00  0.00  17.46  0.00  34.35  10.00  0.00  0.00  343.50  1,197,021.34
5006+220.00  0.00  20.45  0.00  37.91  10.00  0.00  0.00  379.14  1,196,642.20
5006+240.00  0.00  24.52  0.00  44.98  10.00  0.00  0.00  449.78  1,196,192.42
5006+260.00  0.00  26.89  0.00  51.41  10.00  0.00  0.00  514.11  1,195,678.31
5006+280.00  0.00  27.34  0.00  54.23  10.00  0.00  0.00  542.30  1,195,136.01
5006+300.00  0.00  20.93  0.00  48.28  10.00  0.00  0.00  482.76  1,194,653.25
5006+310.00  0.00  17.26  0.00  38.19  5.00  0.00  0.00  190.97  1,194,462.28
5006+310.00  0.00  17.26  0.00  34.52  0.00  0.00  0.00  0.02  1,194,462.26
5006+320.00  0.00  13.76  0.00  31.03  5.00  0.00  0.00  155.11  1,194,307.15
5006+340.00  0.00  13.00  0.00  26.76  10.00  0.00  0.00  267.61  1,194,039.54
5006+360.00  0.00  17.40  0.00  30.40  10.00  0.00  0.00  303.98  1,193,735.56
5006+380.00  0.00  23.20  0.00  40.60  10.00  0.00  0.00  405.98  1,193,329.58
5006+400.00  0.00  21.11  0.00  44.31  10.00  0.00  0.00  443.09  1,192,886.49
5006+420.00  0.00  20.24  0.00  41.35  10.00  0.00  0.00  413.47  1,192,473.02
5006+440.00  0.00  19.83  0.00  40.07  10.00  0.00  0.00  400.65  1,192,072.37
5006+460.00  0.00  20.18  0.00  40.01  10.00  0.00  0.00  400.09  1,191,672.28
5006+480.00  0.00  11.72  0.00  31.90  10.00  0.00  0.00  318.99  1,191,353.29
5006+500.00  0.00  15.22  0.00  26.94  10.00  0.00  0.00  269.43  1,191,083.86
5006+520.00  0.00  8.60  0.00  23.82  10.00  0.00  0.00  238.22  1,190,845.64
5006+540.00  0.00  15.40  0.00  23.99  10.00  0.00  0.00  239.94  1,190,605.70
5006+560.00  0.00  17.49  0.00  32.89  10.00  0.00  0.00  328.89  1,190,276.81
5006+580.00  0.00  16.93  0.00  34.43  10.00  0.00  0.00  344.25  1,189,932.56
5006+600.00  0.00  17.01  0.00  33.95  10.00  0.00  0.00  339.45  1,189,593.11
5006+620.00  0.00  6.44  0.00  23.45  10.00  0.00  0.00  234.54  1,189,358.57
5006+640.00  0.00  7.68  0.00  14.12  10.00  0.00  0.00  141.23  1,189,217.34
5006+660.00  0.00  14.02  0.00  21.70  10.00  0.00  0.00  217.04  1,189,000.30
5006+680.00  0.00  4.89  0.00  18.91  10.00  0.00  0.00  189.06  1,188,811.24
5006+700.00  0.00  5.29  0.00  10.17  10.00  0.00  0.00  101.74  1,188,709.50
5006+720.00  1.57  0.71  1.57  6.00  10.00  15.65  20.35  59.95  1,188,669.89
5006+740.00  0.70  2.92  2.27  3.62  10.00  22.69  29.50  36.22  1,188,663.17
5006+760.00  0.66  2.74  1.37  5.66  10.00  13.68  17.78  56.60  1,188,624.35
5006+780.00  0.00  4.16  0.66  6.90  10.00  6.64  8.63  69.04  1,188,563.95
5006+790.00  0.77  2.89  0.77  7.05  5.00  3.84  4.99  35.25  1,188,533.69
5006+800.00  0.57  2.05  1.34  4.94  5.00  6.70  8.71  24.68  1,188,517.72
5006+810.00  9.45  0.04  10.02  2.09  5.00  50.11  65.14  10.45  1,188,572.41
5006+820.00  0.00  3.79  9.45  3.83  5.00  47.25  61.42  19.17  1,188,614.66
5006+830.00  0.00  7.06  0.00  10.85  5.00  0.00  0.00  54.26  1,188,560.40
5006+840.00  0.00  10.74  0.00  17.80  5.00  0.00  0.00  89.02  1,188,471.38
5006+850.00  0.00  10.98  0.00  21.72  5.00  0.00  0.00  108.62  1,188,362.76
5006+860.00  0.00  11.19  0.00  22.17  5.00  0.00  0.00  110.87  1,188,251.89
5006+870.00  0.00  10.84  0.00  22.03  5.00  0.00  0.00  110.15  1,188,141.75
5006+880.00  0.00  10.45  0.00  21.29  5.00  0.00  0.00  106.45  1,188,035.30
5006+890.00  0.00  11.14  0.00  21.59  5.00  0.00  0.00  107.96  1,187,927.34

199 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5006+900.00  0.00  11.85  0.00  22.99  5.00  0.00  0.00  114.97  1,187,812.37
5006+910.00  0.00  11.98  0.00  23.84  5.00  0.00  0.00  119.18  1,187,693.20
5006+920.00  0.00  12.20  0.00  24.18  5.00  0.00  0.00  120.89  1,187,572.31
5006+930.00  0.00  11.83  0.00  24.03  5.00  0.00  0.00  120.13  1,187,452.18
5006+940.00  0.00  11.38  0.00  23.21  5.00  0.00  0.00  116.06  1,187,336.12
5006+950.00  0.00  10.80  0.00  22.19  5.00  0.00  0.00  110.94  1,187,225.19
5006+960.00  0.00  10.62  0.00  21.43  5.00  0.00  0.00  107.13  1,187,118.06
5006+970.00  0.00  11.55  0.00  22.17  5.00  0.00  0.00  110.84  1,187,007.22
5006+980.00  0.00  12.22  0.00  23.76  5.00  0.00  0.00  118.82  1,186,888.40
5007+000.00  0.00  12.62  0.00  24.83  10.00  0.00  0.00  248.34  1,186,640.06
5007+020.00  0.00  14.34  0.00  26.96  10.00  0.00  0.00  269.56  1,186,370.50
5007+040.00  0.00  12.08  0.00  26.42  10.00  0.00  0.00  264.17  1,186,106.33
5007+060.00  0.00  9.78  0.00  21.85  10.00  0.00  0.00  218.52  1,185,887.81
5007+080.00  0.00  16.91  0.00  26.68  10.00  0.00  0.00  266.81  1,185,621.00
5007+100.00  0.00  19.92  0.00  36.82  10.00  0.00  0.00  368.21  1,185,252.79
5007+120.00  0.00  15.08  0.00  35.00  10.00  0.00  0.00  349.96  1,184,902.83
5007+140.00  0.00  14.85  0.00  29.93  10.00  0.00  0.00  299.26  1,184,603.57
5007+160.00  0.00  12.59  0.00  27.44  10.00  0.00  0.00  274.38  1,184,329.19
5007+180.00  0.00  12.09  0.00  24.68  10.00  0.00  0.00  246.79  1,184,082.40
5007+180.00  0.00  13.51  0.00  25.60  0.00  0.00  0.00  0.00  1,184,082.40
5007+200.00  0.00  16.20  0.00  29.71  10.00  0.00  0.00  297.11  1,183,785.29
5007+220.00  0.00  18.59  0.00  34.79  10.00  0.00  0.00  347.87  1,183,437.42
5007+240.00  0.00  10.88  0.00  29.46  10.00  0.00  0.00  294.63  1,183,142.79
5007+260.00  0.00  12.37  0.00  23.25  10.00  0.00  0.00  232.47  1,182,910.32
5007+280.00  0.00  14.14  0.00  26.51  10.00  0.00  0.00  265.12  1,182,645.20
5007+300.00  0.00  13.14  0.00  27.28  10.00  0.00  0.00  272.77  1,182,372.43
5007+320.00  0.00  16.10  0.00  29.24  10.00  0.00  0.00  292.38  1,182,080.05
5007+340.00  0.00  17.39  0.00  33.49  10.00  0.00  0.00  334.92  1,181,745.13
5007+360.00  0.00  18.10  0.00  35.49  10.00  0.00  0.00  354.87  1,181,390.26
5007+360.00  0.00  23.99  0.00  42.09  0.00  0.00  0.00  0.00  1,181,390.26
5007+380.00  0.00  17.73  0.00  41.72  10.00  0.00  0.00  417.22  1,180,973.04
5007+400.00  0.00  26.75  0.00  44.48  10.00  0.00  0.00  444.81  1,180,528.23
5007+420.00  0.00  30.31  0.00  57.06  10.00  0.00  0.00  570.63  1,179,957.60
5007+440.00  0.00  25.36  0.00  55.67  10.00  0.00  0.00  556.71  1,179,400.89
5007+460.00  0.00  23.88  0.00  49.24  10.00  0.00  0.00  492.42  1,178,908.47
5007+480.00  0.00  22.95  0.00  46.83  10.00  0.00  0.00  468.33  1,178,440.14
5007+500.00  0.00  26.37  0.00  49.32  10.00  0.00  0.00  493.18  1,177,946.96
5007+520.00  0.00  29.48  0.00  55.85  10.00  0.00  0.00  558.48  1,177,388.48
5007+540.00  0.00  30.90  0.00  60.38  10.00  0.00  0.00  603.79  1,176,784.69
5007+560.00  0.00  32.49  0.00  63.39  10.00  0.00  0.00  633.85  1,176,150.84
5007+580.00  0.00  35.23  0.00  67.72  10.00  0.00  0.00  677.17  1,175,473.67
5007+600.00  0.00  32.46  0.00  67.69  10.00  0.00  0.00  676.89  1,174,796.78
5007+620.00  0.00  21.20  0.00  53.65  10.00  0.00  0.00  536.53  1,174,260.25
5007+640.00  0.00  14.72  0.00  35.92  10.00  0.00  0.00  359.15  1,173,901.10
5007+660.00  0.00  20.10  0.00  34.82  10.00  0.00  0.00  348.20  1,173,552.90

200 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5007+680.00  0.00  17.38  0.00  37.48  10.00  0.00  0.00  374.84  1,173,178.06
5007+700.00  0.00  20.26  0.00  37.64  10.00  0.00  0.00  376.44  1,172,801.62
5007+720.00  0.00  46.91  0.00  67.17  10.00  0.00  0.00  671.67  1,172,129.95
5007+740.00  0.00  48.23  0.00  95.13  10.00  0.00  0.00  951.31  1,171,178.64
5007+760.00  0.00  41.73  0.00  89.95  10.00  0.00  0.00  899.54  1,170,279.10
5007+780.00  0.00  27.56  0.00  69.29  10.00  0.00  0.00  692.89  1,169,586.21
5007+800.00  0.00  30.29  0.00  57.85  10.00  0.00  0.00  578.54  1,169,007.67
5007+820.00  0.00  34.09  0.00  64.39  10.00  0.00  0.00  643.86  1,168,363.81
5007+840.00  0.00  29.58  0.00  63.67  10.00  0.00  0.00  636.68  1,167,727.13
5007+860.00  0.00  27.78  0.00  57.36  10.00  0.00  0.00  573.58  1,167,153.55
5007+880.00  0.00  21.81  0.00  49.59  10.00  0.00  0.00  495.87  1,166,657.68
5007+900.00  0.00  20.36  0.00  42.17  10.00  0.00  0.00  421.69  1,166,235.99
5007+920.00  0.00  19.40  0.00  39.76  10.00  0.00  0.00  397.63  1,165,838.36
5007+940.00  0.00  20.33  0.00  39.73  10.00  0.00  0.00  397.26  1,165,441.10
5007+960.00  0.00  18.80  0.00  39.13  10.00  0.00  0.00  391.27  1,165,049.83
5007+980.00  0.00  18.43  0.00  37.23  10.00  0.00  0.00  372.32  1,164,677.51
5008+000.00  0.00  25.99  0.00  44.43  10.00  0.00  0.00  444.25  1,164,233.26
5008+020.00  0.00  22.01  0.00  48.00  10.00  0.00  0.00  480.03  1,163,753.23
5008+040.00  0.00  13.96  0.00  35.97  10.00  0.00  0.00  359.72  1,163,393.51
5008+060.00  0.00  21.22  0.00  35.18  10.00  0.00  0.00  351.84  1,163,041.67
5008+080.00  0.00  24.38  0.00  45.60  10.00  0.00  0.00  455.99  1,162,585.68
5008+100.00  0.00  21.41  0.00  45.79  10.00  0.00  0.00  457.85  1,162,127.83
5008+120.00  0.00  16.60  0.00  38.01  10.00  0.00  0.00  380.08  1,161,747.75
5008+140.00  0.00  20.52  0.00  37.12  10.00  0.00  0.00  371.24  1,161,376.51
5008+155.00  0.00  24.59  0.00  45.11  7.50  0.00  0.00  338.36  1,161,038.16
5008+155.00  0.00  23.66  0.00  48.25  0.00  0.00  0.00  0.00  1,161,038.16
5008+160.00  0.00  25.08  0.00  48.73  2.50  0.00  0.00  121.83  1,160,916.33
5008+180.00  0.00  22.27  0.00  47.35  10.00  0.00  0.00  473.45  1,160,442.88
5008+200.00  0.00  22.23  0.00  44.50  10.00  0.00  0.00  444.96  1,159,997.92
5008+220.00  0.00  19.54  0.00  41.76  10.00  0.00  0.00  417.62  1,159,580.30
5008+240.00  0.13  12.48  0.13  32.02  10.00  1.34  1.74  320.17  1,159,261.87
5008+260.00  0.00  20.94  0.13  33.42  10.00  1.34  1.74  334.20  1,158,929.41
5008+280.00  0.00  19.77  0.00  40.71  10.00  0.00  0.00  407.05  1,158,522.36
5008+300.00  0.00  20.96  0.00  40.73  10.00  0.00  0.00  407.28  1,158,115.08
5008+320.00  0.00  19.15  0.00  40.11  10.00  0.00  0.00  401.10  1,157,713.98
5008+340.00  0.00  20.19  0.00  39.34  10.00  0.00  0.00  393.40  1,157,320.58
5008+360.00  0.00  17.71  0.00  37.90  10.00  0.00  0.00  378.97  1,156,941.61
5008+380.00  0.00  15.54  0.00  33.24  10.00  0.00  0.00  332.43  1,156,609.18
5008+380.00  0.00  10.34  0.00  25.88  0.00  0.00  0.00  0.00  1,156,609.18
5008+400.00  0.00  10.31  0.00  20.66  10.00  0.00  0.00  206.57  1,156,402.61
5008+420.00  0.00  13.14  0.00  23.45  10.00  0.00  0.00  234.50  1,156,168.11
5008+440.00  0.00  16.20  0.00  29.34  10.00  0.00  0.00  293.35  1,155,874.76
5008+460.00  0.00  10.67  0.00  26.87  10.00  0.00  0.00  268.67  1,155,606.09
5008+470.00  0.00  9.02  0.00  19.69  5.00  0.00  0.00  98.46  1,155,507.64
5008+480.00  0.64  7.47  0.64  16.49  5.00  3.20  4.16  82.46  1,155,429.34

201 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5008+490.00  0.00  10.54  0.64  18.01  5.00  3.20  4.16  90.05  1,155,343.46
5008+500.00  0.00  13.85  0.00  24.39  5.00  0.00  0.00  121.95  1,155,221.51
5008+510.00  0.00  17.51  0.00  31.36  5.00  0.00  0.00  156.81  1,155,064.70
5008+520.00  0.00  21.09  0.00  38.61  5.00  0.00  0.00  193.03  1,154,871.68
5008+530.00  0.00  21.56  0.00  42.65  5.00  0.00  0.00  213.27  1,154,658.41
5008+540.00  0.00  21.60  0.00  43.16  5.00  0.00  0.00  215.79  1,154,442.62
5008+550.00  0.00  20.92  0.00  42.52  5.00  0.00  0.00  212.58  1,154,230.05
5008+560.00  0.00  19.82  0.00  40.74  5.00  0.00  0.00  203.70  1,154,026.35
5008+570.00  0.00  18.17  0.00  37.99  5.00  0.00  0.00  189.95  1,153,836.41
5008+580.00  0.00  16.56  0.00  34.73  5.00  0.00  0.00  173.66  1,153,662.75
5008+590.00  0.00  15.75  0.00  32.31  5.00  0.00  0.00  161.56  1,153,501.19
5008+600.00  0.00  15.14  0.00  30.89  5.00  0.00  0.00  154.43  1,153,346.77
5008+610.00  0.00  15.72  0.00  30.86  5.00  0.00  0.00  154.28  1,153,192.49
5008+620.00  0.00  16.67  0.00  32.39  5.00  0.00  0.00  161.94  1,153,030.55
5008+629.97  0.00  15.46  0.00  32.12  4.98  0.00  0.00  160.13  1,152,870.42
5008+629.97  0.00  15.46  0.00  30.91  0.00  0.00  0.00  0.02  1,152,870.40
5008+640.00  0.00  14.77  0.00  30.22  5.01  0.00  0.00  151.55  1,152,718.86
5008+649.97  0.00  11.68  0.00  26.45  4.98  0.00  0.00  131.83  1,152,587.02
5008+649.97  0.00  11.68  0.00  23.36  0.00  0.00  0.00  0.01  1,152,587.01
5008+660.00  0.00  8.47  0.00  20.15  5.01  0.00  0.00  101.04  1,152,485.97
5008+680.00  0.00  8.22  0.00  16.69  10.00  0.00  0.00  166.92  1,152,319.05
5008+700.00  0.00  7.95  0.00  16.18  10.00  0.00  0.00  161.76  1,152,157.29
5008+720.00  0.57  2.33  0.57  10.28  10.00  5.72  7.44  102.83  1,152,061.90
5008+740.00  0.00  8.31  0.57  10.64  10.00  5.72  7.44  106.41  1,151,962.93
5008+760.00  0.00  8.86  0.00  17.17  10.00  0.00  0.00  171.73  1,151,791.20
5008+780.00  0.00  11.20  0.00  20.06  10.00  0.00  0.00  200.57  1,151,590.63
5008+800.00  0.00  15.37  0.00  26.56  10.00  0.00  0.00  265.61  1,151,325.02
5008+820.00  0.00  14.52  0.00  29.89  10.00  0.00  0.00  298.85  1,151,026.17
5008+840.00  0.00  15.85  0.00  30.37  10.00  0.00  0.00  303.66  1,150,722.51
5008+860.00  0.00  14.62  0.00  30.47  10.00  0.00  0.00  304.65  1,150,417.86
5008+880.00  0.00  12.22  0.00  26.84  10.00  0.00  0.00  268.38  1,150,149.48
5008+900.00  0.00  11.76  0.00  23.98  10.00  0.00  0.00  239.83  1,149,909.65
5008+920.00  0.00  13.73  0.00  25.50  10.00  0.00  0.00  254.98  1,149,654.67
5008+940.00  0.00  12.57  0.00  26.30  10.00  0.00  0.00  263.01  1,149,391.66
5008+960.00  0.00  12.58  0.00  25.15  10.00  0.00  0.00  251.47  1,149,140.19
5008+980.00  0.00  8.58  0.00  21.16  10.00  0.00  0.00  211.64  1,148,928.55
5009+000.00  0.00  5.02  0.00  13.61  10.00  0.00  0.00  136.06  1,148,792.49
5009+020.00  0.00  4.58  0.00  9.60  10.00  0.00  0.00  96.00  1,148,696.49
5009+040.00  0.00  13.22  0.00  17.80  10.00  0.00  0.00  177.95  1,148,518.54
5009+060.00  0.00  18.17  0.00  31.39  10.00  0.00  0.00  313.86  1,148,204.68
5009+080.00  0.00  17.93  0.00  36.10  10.00  0.00  0.00  360.99  1,147,843.69
5009+090.00  0.00  15.99  0.00  33.92  5.00  0.00  0.00  169.59  1,147,674.10
5009+090.00  0.00  15.99  0.00  31.97  0.00  0.00  0.00  0.00  1,147,674.10
5009+100.00  0.00  13.92  0.00  29.91  5.00  0.00  0.00  149.53  1,147,524.58
5009+120.00  0.00  32.23  0.00  46.15  10.00  0.00  0.00  461.51  1,147,063.07

202 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5009+130.00  0.00  36.94  0.00  69.18  5.00  0.00  0.00  345.88  1,146,717.19
5009+140.00  0.00  41.57  0.00  78.52  5.00  0.00  0.00  392.58  1,146,324.61
5009+160.00  0.00  42.25  0.00  83.82  10.00  0.00  0.00  838.19  1,145,486.42
5009+180.00  0.00  39.87  0.00  82.12  10.00  0.00  0.00  821.18  1,144,665.24
5009+200.00  0.00  28.57  0.00  68.44  10.00  0.00  0.00  684.36  1,143,980.88
5009+200.00  0.00  33.98  0.00  62.55  0.00  0.00  0.00  0.00  1,143,980.88
5009+220.00  0.00  27.36  0.00  61.34  10.00  0.00  0.00  613.42  1,143,367.46
5009+240.00  0.00  30.70  0.00  58.06  10.00  0.00  0.00  580.58  1,142,786.88
5009+260.00  0.00  29.21  0.00  59.91  10.00  0.00  0.00  599.12  1,142,187.76
5009+280.00  0.00  25.43  0.00  54.64  10.00  0.00  0.00  546.43  1,141,641.33
5009+300.00  0.00  18.86  0.00  44.29  10.00  0.00  0.00  442.90  1,141,198.43
5009+320.00  0.00  16.84  0.00  35.70  10.00  0.00  0.00  357.02  1,140,841.41
5009+340.00  0.00  16.67  0.00  33.51  10.00  0.00  0.00  335.12  1,140,506.29
5009+360.00  0.00  16.23  0.00  32.90  10.00  0.00  0.00  328.95  1,140,177.34
5009+380.00  0.00  13.72  0.00  29.94  10.00  0.00  0.00  299.43  1,139,877.91
5009+400.00  0.10  8.74  0.10  22.46  10.00  0.95  1.24  224.55  1,139,654.60
5009+420.00  0.00  15.49  0.10  24.23  10.00  0.95  1.24  242.25  1,139,413.58
5009+440.00  0.00  22.09  0.00  37.58  10.00  0.00  0.00  375.80  1,139,037.78
5009+460.00  0.00  22.42  0.00  44.51  10.00  0.00  0.00  445.14  1,138,592.64
5009+480.00  0.00  20.73  0.00  43.16  10.00  0.00  0.00  431.55  1,138,161.09
5009+500.00  0.00  18.72  0.00  39.45  10.00  0.00  0.00  394.53  1,137,766.56
5009+520.00  0.00  20.20  0.00  38.92  10.00  0.00  0.00  389.17  1,137,377.39
5009+540.00  0.00  21.58  0.00  41.78  10.00  0.00  0.00  417.80  1,136,959.59
5009+560.00  0.00  20.67  0.00  42.25  10.00  0.00  0.00  422.54  1,136,537.05
5009+580.00  0.00  21.51  0.00  42.18  10.00  0.00  0.00  421.78  1,136,115.27
5009+587.89  0.00  18.56  0.00  40.06  3.94  0.00  0.00  157.95  1,135,957.32
5009+600.00  0.00  14.29  0.00  32.84  6.06  0.00  0.00  198.95  1,135,758.37
5009+620.00  0.00  10.51  0.00  24.80  10.00  0.00  0.00  247.95  1,135,510.42
5009+640.00  0.17  10.00  0.17  20.51  10.00  1.70  2.21  205.09  1,135,307.54
5009+660.00  0.21  9.10  0.38  19.10  10.00  3.81  4.95  190.97  1,135,121.52
5009+680.00  0.00  11.63  0.21  20.72  10.00  2.11  2.74  207.24  1,134,917.03
5009+700.00  0.00  14.89  0.00  26.52  10.00  0.00  0.00  265.17  1,134,651.86
5009+717.89  0.00  14.62  0.00  29.51  8.94  0.00  0.00  263.89  1,134,387.96
5009+720.00  0.00  14.60  0.00  29.22  1.06  0.00  0.00  30.90  1,134,357.06
5009+740.00  0.00  14.33  0.00  28.93  10.00  0.00  0.00  289.32  1,134,067.74
5009+760.00  0.00  17.43  0.00  31.76  10.00  0.00  0.00  317.63  1,133,750.11
5009+780.00  0.00  20.38  0.00  37.81  10.00  0.00  0.00  378.13  1,133,371.98
5009+800.00  0.00  18.40  0.00  38.78  10.00  0.00  0.00  387.79  1,132,984.19
5009+817.42  0.00  16.63  0.00  35.03  8.71  0.00  0.00  305.06  1,132,679.13
5009+820.00  0.00  16.44  0.00  33.07  1.29  0.00  0.00  42.72  1,132,636.42
5009+840.00  0.00  11.70  0.00  28.14  10.00  0.00  0.00  281.38  1,132,355.04
5009+850.00  0.00  10.41  0.00  22.11  5.00  0.00  0.00  110.54  1,132,244.50
5009+850.00  0.00  7.40  0.00  17.81  0.00  0.00  0.00  0.00  1,132,244.50
5009+860.00  0.00  6.12  0.00  13.51  5.00  0.00  0.00  67.57  1,132,176.93
5009+880.00  0.00  6.32  0.00  12.44  10.00  0.00  0.00  124.35  1,132,052.58

203 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5009+900.00  0.00  7.59  0.00  13.91  10.00  0.00  0.00  139.06  1,131,913.52
5009+920.00  0.00  7.62  0.00  15.21  10.00  0.00  0.00  152.12  1,131,761.40
5009+940.00  0.00  16.41  0.00  24.04  10.00  0.00  0.00  240.37  1,131,521.03
5009+947.42  0.00  13.16  0.00  29.57  3.71  0.00  0.00  109.68  1,131,411.36
5009+960.00  0.00  7.69  0.00  20.86  6.29  0.00  0.00  131.21  1,131,280.15
5009+980.00  0.00  16.20  0.00  23.89  10.00  0.00  0.00  238.91  1,131,041.24
5010+000.00  0.00  15.15  0.00  31.35  10.00  0.00  0.00  313.46  1,130,727.78
5010+020.00  0.00  15.72  0.00  30.87  10.00  0.00  0.00  308.66  1,130,419.12
5010+040.00  0.00  15.42  0.00  31.13  10.00  0.00  0.00  311.33  1,130,107.79
5010+060.00  0.00  12.39  0.00  27.80  10.00  0.00  0.00  278.03  1,129,829.76
5010+080.00  0.00  12.66  0.00  25.05  10.00  0.00  0.00  250.46  1,129,579.30
5010+100.00  0.00  11.17  0.00  23.83  10.00  0.00  0.00  238.30  1,129,341.00
5010+120.00  0.00  9.20  0.00  20.38  10.00  0.00  0.00  203.75  1,129,137.25
5010+140.00  0.00  7.55  0.00  16.76  10.00  0.00  0.00  167.58  1,128,969.67
5010+160.00  0.00  12.09  0.00  19.64  10.00  0.00  0.00  196.41  1,128,773.26
5010+180.00  0.00  13.25  0.00  25.34  10.00  0.00  0.00  253.39  1,128,519.87
5010+200.00  0.00  12.18  0.00  25.43  10.00  0.00  0.00  254.27  1,128,265.60
5010+220.00  0.00  9.33  0.00  21.50  10.00  0.00  0.00  215.02  1,128,050.58
5010+240.00  0.00  11.12  0.00  20.44  10.00  0.00  0.00  204.42  1,127,846.16
5010+260.00  0.00  8.00  0.00  19.11  10.00  0.00  0.00  191.10  1,127,655.06
5010+280.00  0.69  5.59  0.69  13.58  10.00  6.89  8.96  135.82  1,127,528.20
5010+300.00  0.50  4.88  1.19  10.47  10.00  11.92  15.50  104.69  1,127,439.00
5010+320.00  0.54  3.89  1.05  8.77  10.00  10.46  13.60  87.74  1,127,364.86
5010+340.00  0.91  3.42  1.45  7.31  10.00  14.53  18.89  73.09  1,127,310.66
5010+360.00  0.83  5.07  1.74  8.48  10.00  17.37  22.58  84.82  1,127,248.42
5010+380.00  0.00  11.13  0.83  16.20  10.00  8.27  10.75  161.96  1,127,097.21
5010+400.00  0.00  9.81  0.00  20.94  10.00  0.00  0.00  209.36  1,126,887.85
5010+420.00  0.00  9.04  0.00  18.84  10.00  0.00  0.00  188.41  1,126,699.44
5010+440.00  0.00  7.05  0.00  16.09  10.00  0.00  0.00  160.86  1,126,538.58
5010+460.00  0.00  11.02  0.00  18.07  10.00  0.00  0.00  180.72  1,126,357.86
5010+480.00  0.00  13.90  0.00  24.92  10.00  0.00  0.00  249.23  1,126,108.63
5010+500.00  0.00  14.58  0.00  28.48  10.00  0.00  0.00  284.83  1,125,823.80
5010+520.00  0.00  9.68  0.00  24.26  10.00  0.00  0.00  242.59  1,125,581.21
5010+540.00  0.00  7.38  0.00  17.06  10.00  0.00  0.00  170.60  1,125,410.61
5010+560.00  0.00  7.14  0.00  14.52  10.00  0.00  0.00  145.20  1,125,265.41
5010+580.00  0.00  7.11  0.00  14.24  10.00  0.00  0.00  142.44  1,125,122.97
5010+600.00  0.00  10.21  0.00  17.32  10.00  0.00  0.00  173.20  1,124,949.77
5010+620.00  0.00  10.36  0.00  20.57  10.00  0.00  0.00  205.68  1,124,744.09
5010+640.00  0.00  7.99  0.00  18.35  10.00  0.00  0.00  183.49  1,124,560.60
5010+660.00  0.00  6.40  0.00  14.40  10.00  0.00  0.00  143.95  1,124,416.65
5010+680.00  0.00  6.56  0.00  12.96  10.00  0.00  0.00  129.64  1,124,287.01
5010+700.00  0.56  5.90  0.56  12.46  10.00  5.64  7.33  124.63  1,124,169.71
5010+720.00  0.00  10.04  0.56  15.94  10.00  5.64  7.33  159.38  1,124,017.66
5010+740.00  0.00  6.99  0.00  17.03  10.00  0.00  0.00  170.31  1,123,847.35
5010+760.00  0.62  4.99  0.62  11.98  10.00  6.16  8.01  119.81  1,123,735.55

204 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5010+780.00  0.81  4.50  1.43  9.48  10.00  14.30  18.59  94.84  1,123,659.30
5010+800.00  0.00  6.60  0.81  11.09  10.00  8.14  10.58  110.92  1,123,558.96
5010+820.00  0.00  7.27  0.00  13.87  10.00  0.00  0.00  138.69  1,123,420.27
5010+840.00  0.00  8.56  0.00  15.84  10.00  0.00  0.00  158.35  1,123,261.92
5010+860.00  0.00  9.42  0.00  17.99  10.00  0.00  0.00  179.85  1,123,082.07
5010+880.00  0.00  8.97  0.00  18.39  10.00  0.00  0.00  183.90  1,122,898.17
5010+900.00  0.00  12.08  0.00  21.05  10.00  0.00  0.00  210.50  1,122,687.67
5010+920.00  0.00  17.20  0.00  29.28  10.00  0.00  0.00  292.78  1,122,394.89
5010+940.00  0.00  17.02  0.00  34.21  10.00  0.00  0.00  342.14  1,122,052.75
5010+960.00  0.00  16.93  0.00  33.95  10.00  0.00  0.00  339.47  1,121,713.28
5010+980.00  0.00  19.21  0.00  36.14  10.00  0.00  0.00  361.35  1,121,351.93
5011+000.00  0.00  15.36  0.00  34.57  10.00  0.00  0.00  345.68  1,121,006.25
5011+020.00  0.00  9.81  0.00  25.17  10.00  0.00  0.00  251.66  1,120,754.59
5011+040.00  0.00  11.07  0.00  20.87  10.00  0.00  0.00  208.73  1,120,545.86
5011+060.00  0.00  12.52  0.00  23.59  10.00  0.00  0.00  235.87  1,120,309.99
5011+080.00  0.00  13.42  0.00  25.94  10.00  0.00  0.00  259.42  1,120,050.57
5011+100.00  0.00  6.23  0.00  19.65  10.00  0.00  0.00  196.51  1,119,854.06
5011+120.00  0.52  7.50  0.52  13.73  10.00  5.22  6.79  137.30  1,119,723.55
5011+140.00  0.00  5.93  0.52  13.43  10.00  5.22  6.79  134.29  1,119,596.05
5011+160.00  0.00  7.07  0.00  13.00  10.00  0.00  0.00  129.97  1,119,466.08
5011+180.00  1.39  3.48  1.39  10.55  10.00  13.87  18.03  105.51  1,119,378.60
5011+200.00  0.00  7.77  1.39  11.25  10.00  13.87  18.03  112.53  1,119,284.10
5011+220.00  0.00  6.93  0.00  14.70  10.00  0.00  0.00  147.00  1,119,137.10
5011+240.00  0.00  7.81  0.00  14.74  10.00  0.00  0.00  147.39  1,118,989.71
5011+260.00  0.00  7.47  0.00  15.28  10.00  0.00  0.00  152.78  1,118,836.93
5011+280.00  0.47  4.38  0.47  11.85  10.00  4.73  6.15  118.49  1,118,724.59
5011+300.00  0.00  6.67  0.47  11.05  10.00  4.73  6.15  110.47  1,118,620.27
5011+320.00  0.00  5.03  0.00  11.69  10.00  0.00  0.00  116.94  1,118,503.33
5011+340.00  0.00  5.00  0.00  10.03  10.00  0.00  0.00  100.33  1,118,403.00
5011+360.00  0.00  6.57  0.00  11.57  10.00  0.00  0.00  115.70  1,118,287.30
5011+380.00  0.00  8.62  0.00  15.19  10.00  0.00  0.00  151.87  1,118,135.43
5011+400.00  0.00  10.17  0.00  18.79  10.00  0.00  0.00  187.93  1,117,947.50
5011+420.00  0.00  8.60  0.00  18.77  10.00  0.00  0.00  187.67  1,117,759.83
5011+420.00  0.00  10.08  0.00  18.67  0.00  0.00  0.00  0.00  1,117,759.83
5011+440.00  0.00  10.04  0.00  20.12  10.00  0.00  0.00  201.19  1,117,558.64
5011+460.00  0.00  17.79  0.00  27.83  10.00  0.00  0.00  278.33  1,117,280.31
5011+480.00  0.00  24.02  0.00  41.81  10.00  0.00  0.00  418.09  1,116,862.22
5011+500.00  0.00  24.32  0.00  48.34  10.00  0.00  0.00  483.39  1,116,378.83
5011+520.00  0.00  24.51  0.00  48.83  10.00  0.00  0.00  488.27  1,115,890.56
5011+540.00  0.00  25.28  0.00  49.78  10.00  0.00  0.00  497.82  1,115,392.74
5011+560.00  0.00  24.86  0.00  50.14  10.00  0.00  0.00  501.35  1,114,891.39
5011+580.00  0.00  19.06  0.00  43.92  10.00  0.00  0.00  439.17  1,114,452.22
5011+600.00  0.00  21.01  0.00  40.07  10.00  0.00  0.00  400.65  1,114,051.57
5011+620.00  0.00  22.08  0.00  43.09  10.00  0.00  0.00  430.90  1,113,620.67
5011+640.00  0.00  23.68  0.00  45.77  10.00  0.00  0.00  457.66  1,113,163.01

205 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5011+660.00  0.00  28.71  0.00  52.39  10.00  0.00  0.00  523.93  1,112,639.08
5011+680.00  0.00  23.67  0.00  52.38  10.00  0.00  0.00  523.75  1,112,115.33
5011+700.00  0.00  23.34  0.00  47.01  10.00  0.00  0.00  470.06  1,111,645.27
5011+720.00  0.00  22.57  0.00  45.91  10.00  0.00  0.00  459.10  1,111,186.17
5011+740.00  0.00  30.83  0.00  53.40  10.00  0.00  0.00  534.04  1,110,652.13
5011+760.00  0.00  31.62  0.00  62.46  10.00  0.00  0.00  624.56  1,110,027.57
5011+780.00  0.00  34.22  0.00  65.84  10.00  0.00  0.00  658.38  1,109,369.19
5011+800.00  0.00  43.55  0.00  77.76  10.00  0.00  0.00  777.64  1,108,591.55
5011+820.00  0.00  44.95  0.00  88.49  10.00  0.00  0.00  884.93  1,107,706.62
5011+840.00  0.00  49.64  0.00  94.58  10.00  0.00  0.00  945.81  1,106,760.81
5011+860.00  0.00  52.41  0.00  102.05  10.00  0.00  0.00  1020.49  1,105,740.32
5011+880.00  0.00  48.31  0.00  100.72  10.00  0.00  0.00  1007.18  1,104,733.14
5011+900.00  0.00  52.36  0.00  100.67  10.00  0.00  0.00  1006.65  1,103,726.49
5011+920.00  0.00  51.62  0.00  103.98  10.00  0.00  0.00  1039.79  1,102,686.70
5011+940.00  0.00  46.65  0.00  98.26  10.00  0.00  0.00  982.64  1,101,704.06
5011+940.00  0.00  43.24  0.00  89.89  0.00  0.00  0.00  0.00  1,101,704.06
5011+960.00  0.00  40.89  0.00  84.13  10.00  0.00  0.00  841.27  1,100,862.79
5011+980.00  0.00  34.00  0.00  74.88  10.00  0.00  0.00  748.84  1,100,113.95
5012+000.00  0.00  39.19  0.00  73.19  10.00  0.00  0.00  731.87  1,099,382.08
5012+000.00  0.00  40.58  0.00  79.76  0.00  0.00  0.00  0.04  1,099,382.04
5012+020.00  0.00  34.96  0.00  75.53  10.00  0.00  0.00  755.30  1,098,626.73
5012+040.00  0.00  39.34  0.00  74.30  10.00  0.00  0.00  743.03  1,097,883.70
5012+060.00  0.00  36.30  0.00  75.65  10.00  0.00  0.00  756.48  1,097,127.22
5012+080.00  0.00  32.64  0.00  68.94  10.00  0.00  0.00  689.43  1,096,437.79
5012+100.00  0.00  34.39  0.00  67.03  10.00  0.00  0.00  670.32  1,095,767.47
5012+120.00  0.00  32.81  0.00  67.20  10.00  0.00  0.00  672.04  1,095,095.43
5012+140.00  0.00  32.80  0.00  65.61  10.00  0.00  0.00  656.10  1,094,439.33
5012+160.00  0.00  31.09  0.00  63.89  10.00  0.00  0.00  638.92  1,093,800.41
5012+180.00  0.00  32.07  0.00  63.16  10.00  0.00  0.00  631.64  1,093,168.77
5012+200.00  0.00  28.64  0.00  60.71  10.00  0.00  0.00  607.12  1,092,561.65
5012+220.00  0.00  25.01  0.00  53.65  10.00  0.00  0.00  536.49  1,092,025.16
5012+240.00  0.00  23.31  0.00  48.31  10.00  0.00  0.00  483.13  1,091,542.03
5012+260.00  0.00  21.10  0.00  44.40  10.00  0.00  0.00  444.02  1,091,098.01
5012+280.00  0.00  17.26  0.00  38.36  10.00  0.00  0.00  383.59  1,090,714.42
5012+300.00  0.00  15.40  0.00  32.66  10.00  0.00  0.00  326.57  1,090,387.85
5012+320.00  0.00  13.45  0.00  28.84  10.00  0.00  0.00  288.43  1,090,099.42
5012+340.00  0.00  11.61  0.00  25.06  10.00  0.00  0.00  250.57  1,089,848.85
5012+360.00  0.00  9.97  0.00  21.58  10.00  0.00  0.00  215.79  1,089,633.06
5012+380.00  0.00  10.16  0.00  20.13  10.00  0.00  0.00  201.32  1,089,431.74
5012+400.00  0.00  9.36  0.00  19.52  10.00  0.00  0.00  195.18  1,089,236.56
5012+420.00  0.00  8.49  0.00  17.84  10.00  0.00  0.00  178.42  1,089,058.14
5012+420.00  0.00  8.49  0.00  16.97  0.00  0.00  0.00  0.00  1,089,058.14
5012+440.00  0.00  7.93  0.00  16.42  10.00  0.00  0.00  164.19  1,088,893.95
5012+460.00  0.00  6.21  0.00  14.14  10.00  0.00  0.00  141.40  1,088,752.55
5012+480.00  0.03  5.55  0.03  11.76  10.00  0.25  0.33  117.60  1,088,635.28

206 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5012+500.00  0.00  5.74  0.03  11.29  10.00  0.25  0.33  112.94  1,088,522.66
5012+520.00  0.00  6.76  0.00  12.50  10.00  0.00  0.00  125.04  1,088,397.62
5012+540.00  0.00  6.32  0.00  13.08  10.00  0.00  0.00  130.78  1,088,266.84
5012+560.00  0.00  7.22  0.00  13.54  10.00  0.00  0.00  135.39  1,088,131.45
5012+580.00  0.00  6.40  0.00  13.62  10.00  0.00  0.00  136.24  1,087,995.21
5012+600.00  0.00  6.53  0.00  12.93  10.00  0.00  0.00  129.28  1,087,865.93
5012+600.00  0.00  5.87  0.00  12.40  0.00  0.00  0.00  0.00  1,087,865.93
5012+620.00  0.00  5.49  0.00  11.36  10.00  0.00  0.00  113.60  1,087,752.33
5012+640.00  0.00  5.73  0.00  11.22  10.00  0.00  0.00  112.22  1,087,640.11
5012+660.00  0.00  8.71  0.00  14.44  10.00  0.00  0.00  144.43  1,087,495.68
5012+680.00  0.00  9.84  0.00  18.55  10.00  0.00  0.00  185.52  1,087,310.16
5012+700.00  0.00  9.73  0.00  19.57  10.00  0.00  0.00  195.71  1,087,114.45
5012+720.00  0.00  5.41  0.00  15.15  10.00  0.00  0.00  151.45  1,086,963.00
5012+740.00  1.25  3.75  1.25  9.16  10.00  12.46  16.20  91.60  1,086,887.60
5012+760.00  0.78  4.96  2.03  8.71  10.00  20.28  26.36  87.06  1,086,826.91
5012+780.00  0.00  4.87  0.78  9.82  10.00  7.82  10.17  98.24  1,086,738.83
5012+800.00  0.00  8.16  0.00  13.03  10.00  0.00  0.00  130.29  1,086,608.54
5012+820.00  0.00  10.43  0.00  18.59  10.00  0.00  0.00  185.91  1,086,422.63
5012+840.00  0.00  10.22  0.00  20.65  10.00  0.00  0.00  206.45  1,086,216.18
5012+860.00  0.00  6.60  0.00  16.81  10.00  0.00  0.00  168.13  1,086,048.05
5012+880.00  0.00  9.06  0.00  15.65  10.00  0.00  0.00  156.54  1,085,891.51
5012+900.00  0.00  10.30  0.00  19.36  10.00  0.00  0.00  193.57  1,085,697.94
5012+920.00  0.00  11.54  0.00  21.84  10.00  0.00  0.00  218.38  1,085,479.56
5012+940.00  0.00  13.58  0.00  25.12  10.00  0.00  0.00  251.18  1,085,228.38
5012+960.00  0.00  12.57  0.00  26.15  10.00  0.00  0.00  261.48  1,084,966.90
5012+980.00  0.00  13.19  0.00  25.76  10.00  0.00  0.00  257.57  1,084,709.33
5013+000.00  0.00  15.50  0.00  28.69  10.00  0.00  0.00  286.89  1,084,422.44
5013+020.00  0.00  12.51  0.00  28.01  10.00  0.00  0.00  280.07  1,084,142.37
5013+040.00  0.00  12.64  0.00  25.15  10.00  0.00  0.00  251.45  1,083,890.92
5013+060.00  0.00  13.13  0.00  25.77  10.00  0.00  0.00  257.66  1,083,633.26
5013+080.00  0.00  21.30  0.00  34.43  10.00  0.00  0.00  344.27  1,083,288.99
5013+100.00  0.00  19.20  0.00  40.50  10.00  0.00  0.00  404.97  1,082,884.02
5013+120.00  0.00  22.61  0.00  41.80  10.00  0.00  0.00  418.02  1,082,466.00
5013+140.00  0.00  20.59  0.00  43.20  10.00  0.00  0.00  431.98  1,082,034.02
5013+160.00  0.00  21.55  0.00  42.14  10.00  0.00  0.00  421.42  1,081,612.60
5013+180.00  0.00  22.31  0.00  43.86  10.00  0.00  0.00  438.59  1,081,174.01
5013+200.00  0.00  23.84  0.00  46.15  10.00  0.00  0.00  461.46  1,080,712.55
5013+220.00  0.00  26.52  0.00  50.36  10.00  0.00  0.00  503.57  1,080,208.98
5013+235.00  0.00  27.61  0.00  54.13  7.50  0.00  0.00  405.98  1,079,803.00
5013+235.00  0.00  30.47  0.00  58.08  0.00  0.00  0.00  0.00  1,079,803.00
5013+240.00  0.00  30.54  0.00  61.01  2.50  0.00  0.00  152.53  1,079,650.47
5013+260.00  0.00  26.90  0.00  57.45  10.00  0.00  0.00  574.45  1,079,076.02
5013+280.00  0.00  34.94  0.00  61.84  10.00  0.00  0.00  618.43  1,078,457.59
5013+300.00  0.00  32.44  0.00  67.38  10.00  0.00  0.00  673.80  1,077,783.79
5013+320.00  0.00  33.22  0.00  65.66  10.00  0.00  0.00  656.62  1,077,127.17

207 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5013+340.00  0.00  29.75  0.00  62.98  10.00  0.00  0.00  629.76  1,076,497.41
5013+360.00  0.00  26.01  0.00  55.77  10.00  0.00  0.00  557.66  1,075,939.75
5013+380.00  0.00  18.38  0.00  44.39  10.00  0.00  0.00  443.89  1,075,495.86
5013+390.00  0.00  16.78  0.00  35.16  5.00  0.00  0.00  175.78  1,075,320.09
5013+390.00  0.00  15.25  0.00  32.03  0.00  0.00  0.00  0.00  1,075,320.09
5013+400.00  0.00  13.82  0.00  29.07  5.00  0.00  0.00  145.36  1,075,174.73
5013+420.00  0.00  13.52  0.00  27.34  10.00  0.00  0.00  273.38  1,074,901.35
5013+440.00  0.00  12.92  0.00  26.44  10.00  0.00  0.00  264.35  1,074,637.00
5013+460.00  0.00  15.71  0.00  28.63  10.00  0.00  0.00  286.29  1,074,350.71
5013+480.00  0.00  19.29  0.00  35.00  10.00  0.00  0.00  350.00  1,074,000.71
5013+500.00  0.00  12.72  0.00  32.01  10.00  0.00  0.00  320.05  1,073,680.66
5013+520.00  0.00  11.50  0.00  24.22  10.00  0.00  0.00  242.22  1,073,438.44
5013+540.00  0.00  8.42  0.00  19.93  10.00  0.00  0.00  199.28  1,073,239.16
5013+560.00  0.00  7.46  0.00  15.89  10.00  0.00  0.00  158.86  1,073,080.30
5013+580.00  0.00  6.71  0.00  14.17  10.00  0.00  0.00  141.72  1,072,938.58
5013+600.00  0.00  6.04  0.00  12.75  10.00  0.00  0.00  127.54  1,072,811.04
5013+620.00  0.00  5.18  0.00  11.22  10.00  0.00  0.00  112.22  1,072,698.82
5013+640.00  0.00  4.08  0.00  9.26  10.00  0.00  0.00  92.60  1,072,606.22
5013+660.00  0.00  6.61  0.00  10.69  10.00  0.00  0.00  106.92  1,072,499.30
5013+680.00  0.00  6.53  0.00  13.14  10.00  0.00  0.00  131.39  1,072,367.91
5013+700.00  0.00  4.29  0.00  10.82  10.00  0.00  0.00  108.22  1,072,259.69
5013+720.00  0.00  7.63  0.00  11.92  10.00  0.00  0.00  119.18  1,072,140.51
5013+740.00  0.00  5.14  0.00  12.76  10.00  0.00  0.00  127.62  1,072,012.89
5013+760.00  1.16  3.09  1.16  8.22  10.00  11.62  15.11  82.23  1,071,945.77
5013+780.00  1.42  4.64  2.59  7.73  10.00  25.85  33.61  77.30  1,071,902.07
5013+800.00  2.81  4.36  4.24  9.00  10.00  42.37  55.08  90.01  1,071,867.14
5013+820.00  0.00  5.04  2.81  9.40  10.00  28.14  36.58  93.98  1,071,809.74
5013+840.00  0.82  6.45  0.82  11.49  10.00  8.22  10.69  114.94  1,071,705.49
5013+860.00  0.00  6.64  0.82  13.09  10.00  8.22  10.69  130.90  1,071,585.28
5013+880.00  0.00  8.35  0.00  14.98  10.00  0.00  0.00  149.84  1,071,435.44
5013+900.00  0.00  11.44  0.00  19.79  10.00  0.00  0.00  197.85  1,071,237.59
5013+920.00  0.00  10.12  0.00  21.55  10.00  0.00  0.00  215.54  1,071,022.05
5013+940.00  0.00  8.25  0.00  18.37  10.00  0.00  0.00  183.68  1,070,838.37
5013+960.00  0.00  10.79  0.00  19.04  10.00  0.00  0.00  190.39  1,070,647.98
5013+980.00  0.00  16.81  0.00  27.60  10.00  0.00  0.00  276.01  1,070,371.97
5014+000.00  0.00  20.61  0.00  37.43  10.00  0.00  0.00  374.26  1,069,997.71
5014+020.00  0.00  25.84  0.00  46.45  10.00  0.00  0.00  464.47  1,069,533.24
5014+040.00  0.00  29.91  0.00  55.75  10.00  0.00  0.00  557.46  1,068,975.78
5014+060.00  0.00  33.33  0.00  63.24  10.00  0.00  0.00  632.44  1,068,343.34
5014+060.00  0.00  36.50  0.00  69.83  0.00  0.00  0.00  0.00  1,068,343.34
5014+080.00  0.00  34.84  0.00  71.34  10.00  0.00  0.00  713.35  1,067,629.99
5014+100.00  0.00  35.69  0.00  70.53  10.00  0.00  0.00  705.27  1,066,924.72
5014+120.00  0.00  29.42  0.00  65.11  10.00  0.00  0.00  651.09  1,066,273.63
5014+140.00  0.00  31.00  0.00  60.42  10.00  0.00  0.00  604.22  1,065,669.41
5014+160.00  0.00  26.03  0.00  57.03  10.00  0.00  0.00  570.33  1,065,099.08

208 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5014+180.00  0.00  19.18  0.00  45.21  10.00  0.00  0.00  452.06  1,064,647.02
5014+200.00  0.00  17.86  0.00  37.04  10.00  0.00  0.00  370.36  1,064,276.66
5014+220.00  0.00  12.34  0.00  30.20  10.00  0.00  0.00  301.96  1,063,974.70
5014+240.00  0.00  10.30  0.00  22.63  10.00  0.00  0.00  226.34  1,063,748.36
5014+260.00  0.00  11.50  0.00  21.79  10.00  0.00  0.00  217.92  1,063,530.44
5014+280.00  0.00  11.04  0.00  22.54  10.00  0.00  0.00  225.39  1,063,305.05
5014+300.00  0.00  11.01  0.00  22.05  10.00  0.00  0.00  220.51  1,063,084.54
5014+320.00  0.68  7.15  0.68  18.16  10.00  6.83  8.88  181.58  1,062,911.83
5014+340.00  0.38  6.44  1.06  13.59  10.00  10.63  13.82  135.93  1,062,789.72
5014+360.00  1.91  4.46  2.29  10.90  10.00  22.87  29.73  109.01  1,062,710.44
5014+380.00  0.00  6.52  1.91  10.98  10.00  19.07  24.79  109.78  1,062,625.46
5014+400.00  0.00  5.92  0.00  12.44  10.00  0.00  0.00  124.42  1,062,501.04
5014+420.00  0.00  5.67  0.00  11.59  10.00  0.00  0.00  115.88  1,062,385.16
5014+440.00  0.00  5.23  0.00  10.89  10.00  0.00  0.00  108.90  1,062,276.26
5014+460.00  0.00  8.17  0.00  13.40  10.00  0.00  0.00  133.97  1,062,142.29
5014+480.00  0.00  10.18  0.00  18.35  10.00  0.00  0.00  183.51  1,061,958.78
5014+500.00  0.00  8.68  0.00  18.86  10.00  0.00  0.00  188.56  1,061,770.22
5014+520.00  0.00  10.57  0.00  19.25  10.00  0.00  0.00  192.50  1,061,577.72
5014+540.00  0.00  10.49  0.00  21.06  10.00  0.00  0.00  210.64  1,061,367.08
5014+560.00  0.00  12.08  0.00  22.57  10.00  0.00  0.00  225.74  1,061,141.34
5014+580.00  0.00  11.99  0.00  24.07  10.00  0.00  0.00  240.74  1,060,900.60
5014+600.00  0.00  13.08  0.00  25.07  10.00  0.00  0.00  250.71  1,060,649.89
5014+620.00  0.00  12.83  0.00  25.91  10.00  0.00  0.00  259.08  1,060,390.81
5014+640.00  0.00  14.00  0.00  26.83  10.00  0.00  0.00  268.30  1,060,122.51
5014+660.00  0.00  16.45  0.00  30.45  10.00  0.00  0.00  304.54  1,059,817.97
5014+680.00  0.00  20.74  0.00  37.19  10.00  0.00  0.00  371.89  1,059,446.08
5014+700.00  0.00  20.82  0.00  41.56  10.00  0.00  0.00  415.59  1,059,030.49
5014+720.00  0.00  19.24  0.00  40.07  10.00  0.00  0.00  400.65  1,058,629.84
5014+740.00  0.00  20.39  0.00  39.63  10.00  0.00  0.00  396.34  1,058,233.50
5014+760.00  0.00  19.93  0.00  40.32  10.00  0.00  0.00  403.18  1,057,830.32
5014+780.00  0.00  24.99  0.00  44.92  10.00  0.00  0.00  449.20  1,057,381.12
5014+800.00  0.00  28.02  0.00  53.02  10.00  0.00  0.00  530.15  1,056,850.97
5014+820.00  0.00  26.68  0.00  54.70  10.00  0.00  0.00  547.04  1,056,303.93
5014+840.00  0.00  27.95  0.00  54.63  10.00  0.00  0.00  546.31  1,055,757.62
5014+860.00  0.00  27.52  0.00  55.47  10.00  0.00  0.00  554.72  1,055,202.90
5014+880.00  0.00  31.78  0.00  59.30  10.00  0.00  0.00  593.01  1,054,609.89
5014+900.00  0.00  32.01  0.00  63.79  10.00  0.00  0.00  637.92  1,053,971.97
5014+920.00  0.00  24.33  0.00  56.34  10.00  0.00  0.00  563.40  1,053,408.57
5014+940.00  0.00  36.10  0.00  60.42  10.00  0.00  0.00  604.23  1,052,804.34
5014+960.00  0.00  36.35  0.00  72.44  10.00  0.00  0.00  724.42  1,052,079.92
5014+980.00  0.00  37.97  0.00  74.31  10.00  0.00  0.00  743.12  1,051,336.80
5015+000.00  0.00  38.24  0.00  76.20  10.00  0.00  0.00  762.02  1,050,574.78
5015+020.00  0.00  34.26  0.00  72.50  10.00  0.00  0.00  724.97  1,049,849.81
5015+040.00  0.00  27.50  0.00  61.77  10.00  0.00  0.00  617.65  1,049,232.16
5015+060.00  0.00  22.98  0.00  50.48  10.00  0.00  0.00  504.82  1,048,727.34

209 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5015+080.00  0.00  25.35  0.00  48.33  10.00  0.00  0.00  483.32  1,048,244.02
5015+100.00  0.00  19.99  0.00  45.35  10.00  0.00  0.00  453.46  1,047,790.56
5015+120.00  0.00  12.72  0.00  32.72  10.00  0.00  0.00  327.16  1,047,463.40
5015+140.00  0.00  13.97  0.00  26.69  10.00  0.00  0.00  266.90  1,047,196.50
5015+160.00  0.00  13.31  0.00  27.27  10.00  0.00  0.00  272.74  1,046,923.76
5015+180.00  0.00  12.14  0.00  25.45  10.00  0.00  0.00  254.50  1,046,669.26
5015+200.00  0.00  9.69  0.00  21.83  10.00  0.00  0.00  218.32  1,046,450.94
5015+220.00  0.00  8.92  0.00  18.61  10.00  0.00  0.00  186.05  1,046,264.89
5015+240.00  0.00  6.65  0.00  15.57  10.00  0.00  0.00  155.68  1,046,109.21
5015+260.00  0.43  3.35  0.43  10.00  10.00  4.31  5.60  99.99  1,046,014.82
5015+280.00  0.00  6.73  0.43  10.08  10.00  4.31  5.60  100.79  1,045,919.63
5015+300.00  0.00  6.85  0.00  13.58  10.00  0.00  0.00  135.79  1,045,783.84
5015+320.00  0.52  6.22  0.52  13.07  10.00  5.15  6.70  130.69  1,045,659.85
5015+340.00  0.45  6.62  0.97  12.84  10.00  9.68  12.58  128.39  1,045,544.04
5015+360.00  0.00  8.47  0.45  15.09  10.00  4.53  5.89  150.91  1,045,399.02
5015+380.00  0.00  14.18  0.00  22.65  10.00  0.00  0.00  226.50  1,045,172.52
5015+400.00  0.00  17.97  0.00  32.14  10.00  0.00  0.00  321.41  1,044,851.11
5015+420.00  0.00  20.36  0.00  38.32  10.00  0.00  0.00  383.22  1,044,467.89
5015+440.00  0.00  12.68  0.00  33.04  10.00  0.00  0.00  330.37  1,044,137.52
5015+460.00  0.00  15.89  0.00  28.57  10.00  0.00  0.00  285.67  1,043,851.85
5015+480.00  0.00  20.28  0.00  36.17  10.00  0.00  0.00  361.68  1,043,490.17
5015+500.00  0.00  19.97  0.00  40.26  10.00  0.00  0.00  402.55  1,043,087.62
5015+520.00  0.00  23.90  0.00  43.88  10.00  0.00  0.00  438.77  1,042,648.85
5015+540.00  0.00  29.72  0.00  53.63  10.00  0.00  0.00  536.25  1,042,112.60
5015+560.00  0.00  35.42  0.00  65.14  10.00  0.00  0.00  651.38  1,041,461.22
5015+580.00  0.00  39.46  0.00  74.88  10.00  0.00  0.00  748.79  1,040,712.43
5015+600.00  0.00  31.31  0.00  70.77  10.00  0.00  0.00  707.72  1,040,004.71
5015+620.00  0.00  30.30  0.00  61.60  10.00  0.00  0.00  616.04  1,039,388.67
5015+640.00  0.00  30.45  0.00  60.74  10.00  0.00  0.00  607.42  1,038,781.25
5015+660.00  0.00  32.75  0.00  63.20  10.00  0.00  0.00  631.95  1,038,149.30
5015+680.00  0.00  35.92  0.00  68.66  10.00  0.00  0.00  686.63  1,037,462.67
5015+700.00  0.00  33.61  0.00  69.52  10.00  0.00  0.00  695.24  1,036,767.43
5015+720.00  0.00  35.99  0.00  69.60  10.00  0.00  0.00  695.96  1,036,071.47
5015+740.00  0.00  27.33  0.00  63.32  10.00  0.00  0.00  633.17  1,035,438.30
5015+760.00  0.00  26.75  0.00  54.08  10.00  0.00  0.00  540.82  1,034,897.48
5015+780.00  0.00  30.57  0.00  57.33  10.00  0.00  0.00  573.25  1,034,324.23
5015+800.00  0.00  29.94  0.00  60.52  10.00  0.00  0.00  605.15  1,033,719.08
5015+820.00  0.00  30.83  0.00  60.77  10.00  0.00  0.00  607.67  1,033,111.41
5015+830.00  0.00  27.61  0.00  58.44  5.00  0.00  0.00  292.20  1,032,819.21
5015+830.00  0.00  27.95  0.00  55.57  0.00  0.00  0.00  0.00  1,032,819.21
5015+840.00  0.00  24.82  0.00  52.78  5.00  0.00  0.00  263.89  1,032,555.33
5015+860.00  0.00  29.59  0.00  54.41  10.00  0.00  0.00  544.12  1,032,011.21
5015+880.00  0.00  33.49  0.00  63.08  10.00  0.00  0.00  630.82  1,031,380.39
5015+900.00  0.00  36.89  0.00  70.38  10.00  0.00  0.00  703.79  1,030,676.60
5015+920.00  0.00  26.38  0.00  63.26  10.00  0.00  0.00  632.61  1,030,043.99

210 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5015+940.00  0.00  27.03  0.00  53.40  10.00  0.00  0.00  534.01  1,029,509.98
5015+960.00  0.00  27.36  0.00  54.38  10.00  0.00  0.00  543.81  1,028,966.17
5015+980.00  0.00  30.36  0.00  57.72  10.00  0.00  0.00  577.19  1,028,388.98
5016+000.00  0.00  23.53  0.00  53.90  10.00  0.00  0.00  538.97  1,027,850.01
5016+020.00  0.00  27.27  0.00  50.80  10.00  0.00  0.00  508.00  1,027,342.01
5016+040.00  0.00  24.93  0.00  52.20  10.00  0.00  0.00  522.00  1,026,820.01
5016+060.00  0.00  22.65  0.00  47.59  10.00  0.00  0.00  475.87  1,026,344.14
5016+080.00  0.00  18.40  0.00  41.06  10.00  0.00  0.00  410.58  1,025,933.56
5016+100.00  0.00  15.88  0.00  34.28  10.00  0.00  0.00  342.80  1,025,590.76
5016+120.00  0.00  16.70  0.00  32.57  10.00  0.00  0.00  325.72  1,025,265.04
5016+140.00  0.00  19.22  0.00  35.91  10.00  0.00  0.00  359.11  1,024,905.93
5016+160.00  0.00  17.90  0.00  37.12  10.00  0.00  0.00  371.15  1,024,534.78
5016+180.00  0.00  24.25  0.00  42.15  10.00  0.00  0.00  421.49  1,024,113.29
5016+200.00  0.00  25.44  0.00  49.69  10.00  0.00  0.00  496.85  1,023,616.44
5016+220.00  0.00  25.55  0.00  50.98  10.00  0.00  0.00  509.84  1,023,106.60
5016+240.00  0.00  27.34  0.00  52.89  10.00  0.00  0.00  528.91  1,022,577.69
5016+260.00  0.00  33.75  0.00  61.09  10.00  0.00  0.00  610.93  1,021,966.76
5016+280.00  0.00  33.81  0.00  67.56  10.00  0.00  0.00  675.64  1,021,291.12
5016+300.00  0.00  25.16  0.00  58.97  10.00  0.00  0.00  589.72  1,020,701.40
5016+320.00  0.00  31.76  0.00  56.91  10.00  0.00  0.00  569.13  1,020,132.27
5016+340.00  0.00  28.66  0.00  60.41  10.00  0.00  0.00  604.14  1,019,528.13
5016+360.00  0.00  34.67  0.00  63.32  10.00  0.00  0.00  633.24  1,018,894.89
5016+380.00  0.00  35.75  0.00  70.41  10.00  0.00  0.00  704.12  1,018,190.77
5016+400.00  0.00  34.93  0.00  70.67  10.00  0.00  0.00  706.73  1,017,484.04
5016+420.00  0.00  32.75  0.00  67.68  10.00  0.00  0.00  676.77  1,016,807.27
5016+440.00  0.00  31.98  0.00  64.73  10.00  0.00  0.00  647.33  1,016,159.94
5016+460.00  0.00  29.15  0.00  61.13  10.00  0.00  0.00  611.27  1,015,548.67
5016+480.00  0.00  30.30  0.00  59.44  10.00  0.00  0.00  594.44  1,014,954.23
5016+500.00  0.00  38.18  0.00  68.48  10.00  0.00  0.00  684.80  1,014,269.43
5016+520.00  0.00  37.65  0.00  75.83  10.00  0.00  0.00  758.34  1,013,511.09
5016+520.00  0.00  35.97  0.00  73.62  0.00  0.00  0.00  0.00  1,013,511.09
5016+540.00  0.00  37.69  0.00  73.66  10.00  0.00  0.00  736.57  1,012,774.52
5016+560.00  0.00  37.13  0.00  74.82  10.00  0.00  0.00  748.21  1,012,026.31
5016+580.00  0.00  40.16  0.00  77.29  10.00  0.00  0.00  772.88  1,011,253.43
5016+600.00  0.00  35.80  0.00  75.96  10.00  0.00  0.00  759.60  1,010,493.83
5016+600.00  0.00  35.80  0.00  71.61  0.00  0.00  0.00  0.00  1,010,493.83
5016+620.00  0.00  27.33  0.00  63.14  10.00  0.00  0.00  631.38  1,009,862.45
5016+640.00  0.00  25.89  0.00  53.22  10.00  0.00  0.00  532.22  1,009,330.23
5016+660.00  0.00  26.39  0.00  52.28  10.00  0.00  0.00  522.78  1,008,807.45
5016+680.00  0.00  25.31  0.00  51.70  10.00  0.00  0.00  517.00  1,008,290.45
5016+700.00  0.00  26.15  0.00  51.46  10.00  0.00  0.00  514.61  1,007,775.84
5016+720.00  0.00  18.36  0.00  44.51  10.00  0.00  0.00  445.14  1,007,330.70
5016+740.00  0.00  11.39  0.00  29.75  10.00  0.00  0.00  297.54  1,007,033.16
5016+760.00  0.00  9.90  0.00  21.29  10.00  0.00  0.00  212.91  1,006,820.25
5016+780.00  5.80  6.10  5.80  16.00  10.00  57.97  75.36  160.04  1,006,735.57

211 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5016+800.00  7.68  6.86  13.47  12.96  10.00  134.74  175.16  129.60  1,006,781.13
5016+820.00  7.54  7.14  15.21  14.00  10.00  152.13  197.77  139.95  1,006,838.95
5016+840.00  7.56  7.29  15.10  14.43  10.00  150.99  196.29  144.27  1,006,890.97
5016+860.00  8.79  7.92  16.35  15.21  10.00  163.51  212.56  152.09  1,006,951.44
5016+880.00  1.09  10.94  9.88  18.86  10.00  98.78  128.41  188.58  1,006,891.28
5016+900.00  0.00  13.69  1.09  24.62  10.00  10.90  14.17  246.23  1,006,659.22
5016+920.00  0.00  20.98  0.00  34.67  10.00  0.00  0.00  346.66  1,006,312.56
5016+940.00  0.00  25.03  0.00  46.01  10.00  0.00  0.00  460.06  1,005,852.50
5016+960.00  0.00  33.21  0.00  58.23  10.00  0.00  0.00  582.31  1,005,270.19
5016+980.00  0.00  36.24  0.00  69.45  10.00  0.00  0.00  694.46  1,004,575.73
5017+000.00  0.00  38.29  0.00  74.53  10.00  0.00  0.00  745.31  1,003,830.42
5017+020.00  0.00  31.52  0.00  69.81  10.00  0.00  0.00  698.14  1,003,132.28
5017+040.00  0.00  30.52  0.00  62.04  10.00  0.00  0.00  620.43  1,002,511.85
5017+060.00  0.00  31.02  0.00  61.54  10.00  0.00  0.00  615.36  1,001,896.49
5017+080.00  0.00  29.33  0.00  60.35  10.00  0.00  0.00  603.46  1,001,293.03
5017+100.00  0.00  23.57  0.00  52.90  10.00  0.00  0.00  528.97  1,000,764.06
5017+120.00  0.00  21.90  0.00  45.46  10.00  0.00  0.00  454.64  1,000,309.42
5017+140.00  0.00  15.77  0.00  37.67  10.00  0.00  0.00  376.68  999,932.74 
5017+160.00  0.00  13.03  0.00  28.81  10.00  0.00  0.00  288.06  999,644.68 
5017+180.00  1.93  9.84  1.93  22.87  10.00  19.32  25.12  228.73  999,441.06 
5017+200.00  2.84  11.32  4.78  21.16  10.00  47.76  62.09  211.60  999,291.55 
5017+220.00  0.79  12.26  3.64  23.58  10.00  36.37  47.28  235.80  999,103.03 
5017+240.00  1.22  10.87  2.02  23.12  10.00  20.15  26.20  231.24  998,897.99 
5017+260.00  2.91  10.87  4.13  21.73  10.00  41.28  53.66  217.34  998,734.31 
5017+280.00  5.38  9.00  8.29  19.87  10.00  82.85  107.71  198.73  998,643.28 
5017+300.00  10.67  7.74  16.05  16.75  10.00  160.49  208.64  167.45  998,684.47 
5017+320.00  7.26  8.36  17.93  16.10  10.00  179.31  233.10  160.99  998,756.58 
5017+340.00  2.34  9.72  9.60  18.08  10.00  96.02  124.83  180.81  998,700.60 
5017+340.00  1.90  11.11  4.25  20.83  0.00  0.00  0.00  0.00  998,700.60 
5017+360.00  1.41  10.27  3.32  21.38  10.00  33.18  43.13  213.75  998,529.98 
5017+380.00  0.00  12.51  1.41  22.78  10.00  14.14  18.38  227.83  998,320.54 
5017+400.00  0.00  13.84  0.00  26.36  10.00  0.00  0.00  263.55  998,056.99 
5017+420.00  0.00  12.23  0.00  26.07  10.00  0.00  0.00  260.66  997,796.33 
5017+440.00  0.00  10.68  0.00  22.90  10.00  0.00  0.00  229.01  997,567.32 
5017+460.00  3.36  9.69  3.36  20.37  10.00  33.63  43.72  203.69  997,407.35 
5017+480.00  1.75  12.76  5.12  22.45  10.00  51.17  66.52  224.51  997,249.36 
5017+500.00  0.00  19.40  1.75  32.16  10.00  17.54  22.80  321.60  996,950.56 
5017+520.00  0.00  26.26  0.00  45.66  10.00  0.00  0.00  456.58  996,493.98 
5017+540.00  0.00  25.56  0.00  51.82  10.00  0.00  0.00  518.16  995,975.82 
5017+560.00  0.00  30.85  0.00  56.41  10.00  0.00  0.00  564.08  995,411.74 
5017+563.95  0.00  30.63  0.00  61.48  1.97  0.00  0.00  121.27  995,290.47 
5017+580.00  0.00  29.63  0.00  60.26  8.03  0.00  0.00  483.74  994,806.73 
5017+593.95  0.00  30.11  0.00  59.74  6.97  0.00  0.00  416.52  994,390.21 
5017+600.00  0.00  30.19  0.00  60.30  3.03  0.00  0.00  182.56  994,207.64 
5017+620.00  0.00  28.74  0.00  58.93  10.00  0.00  0.00  589.27  993,618.37 

212 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5017+640.00  0.00  26.77  0.00  55.51  10.00  0.00  0.00  555.10  993,063.27 
5017+660.00  0.00  22.89  0.00  49.66  10.00  0.00  0.00  496.59  992,566.68 
5017+678.40  0.00  22.88  0.00  45.77  9.20  0.00  0.00  421.06  992,145.62 
5017+680.00  0.00  22.74  0.00  45.62  0.80  0.00  0.00  36.49  992,109.13 
5017+680.00  0.00  22.74  0.00  45.47  0.00  0.00  0.00  0.00  992,109.13 
5017+700.00  0.00  15.02  0.00  37.75  10.00  0.00  0.00  377.53  991,731.60 
5017+708.40  0.00  13.49  0.00  28.51  4.20  0.00  0.00  119.73  991,611.87 
5017+720.00  0.00  12.08  0.00  25.57  5.80  0.00  0.00  148.32  991,463.55 
5017+740.00  0.00  13.20  0.00  25.28  10.00  0.00  0.00  252.83  991,210.72 
5017+760.00  0.00  12.49  0.00  25.69  10.00  0.00  0.00  256.91  990,953.81 
5017+780.00  0.00  13.49  0.00  25.98  10.00  0.00  0.00  259.79  990,694.02 
5017+800.00  0.00  21.34  0.00  34.83  10.00  0.00  0.00  348.33  990,345.69 
5017+820.00  0.00  21.64  0.00  42.98  10.00  0.00  0.00  429.81  989,915.88 
5017+840.00  0.00  20.29  0.00  41.93  10.00  0.00  0.00  419.28  989,496.60 
5017+860.00  0.00  14.22  0.00  34.51  10.00  0.00  0.00  345.12  989,151.48 
5017+880.00  0.00  17.48  0.00  31.70  10.00  0.00  0.00  317.01  988,834.47 
5017+900.00  0.00  20.96  0.00  38.44  10.00  0.00  0.00  384.38  988,450.09 
5017+920.00  0.00  24.30  0.00  45.26  10.00  0.00  0.00  452.58  987,997.51 
5017+940.00  0.00  27.07  0.00  51.36  10.00  0.00  0.00  513.64  987,483.87 
5017+960.00  0.00  24.19  0.00  51.25  10.00  0.00  0.00  512.54  986,971.33 
5017+980.00  0.00  28.21  0.00  52.40  10.00  0.00  0.00  523.99  986,447.34 
5018+000.00  0.00  28.14  0.00  56.35  10.00  0.00  0.00  563.46  985,883.88 
5018+020.00  0.00  34.18  0.00  62.31  10.00  0.00  0.00  623.13  985,260.75 
5018+040.00  0.00  37.78  0.00  71.95  10.00  0.00  0.00  719.53  984,541.22 
5018+040.00  0.00  36.14  0.00  73.91  0.00  0.00  0.00  0.00  984,541.22 
5018+060.00  0.00  29.68  0.00  65.82  10.00  0.00  0.00  658.15  983,883.07 
5018+080.00  0.00  29.09  0.00  58.77  10.00  0.00  0.00  587.70  983,295.37 
5018+100.00  0.00  30.87  0.00  59.96  10.00  0.00  0.00  599.63  982,695.74 
5018+120.00  0.00  30.81  0.00  61.68  10.00  0.00  0.00  616.83  982,078.91 
5018+140.00  0.00  27.30  0.00  58.12  10.00  0.00  0.00  581.16  981,497.75 
5018+160.00  0.00  28.05  0.00  55.36  10.00  0.00  0.00  553.57  980,944.18 
5018+180.00  0.00  27.96  0.00  56.01  10.00  0.00  0.00  560.13  980,384.05 
5018+200.00  0.00  23.34  0.00  51.30  10.00  0.00  0.00  512.99  979,871.06 
5018+220.00  0.00  22.97  0.00  46.31  10.00  0.00  0.00  463.12  979,407.94 
5018+240.00  0.00  21.00  0.00  43.98  10.00  0.00  0.00  439.75  978,968.19 
5018+260.00  0.00  16.87  0.00  37.87  10.00  0.00  0.00  378.68  978,589.51 
5018+280.00  0.76  7.66  0.76  24.52  10.00  7.58  9.85  245.23  978,354.14 
5018+300.00  0.55  5.15  1.31  12.81  10.00  13.09  17.02  128.10  978,243.05 
5018+320.00  0.00  6.09  0.55  11.24  10.00  5.51  7.16  112.38  978,137.84 
5018+340.00  0.00  11.58  0.00  17.67  10.00  0.00  0.00  176.70  977,961.14 
5018+360.00  0.00  11.45  0.00  23.04  10.00  0.00  0.00  230.38  977,730.76 
5018+380.00  0.00  10.80  0.00  22.25  10.00  0.00  0.00  222.50  977,508.26 
5018+400.00  0.00  7.52  0.00  18.32  10.00  0.00  0.00  183.15  977,325.11 
5018+420.00  0.00  6.95  0.00  14.46  10.00  0.00  0.00  144.64  977,180.47 
5018+440.00  0.00  6.54  0.00  13.48  10.00  0.00  0.00  134.82  977,045.65 

213 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5018+460.00  0.00  8.51  0.00  15.04  10.00  0.00  0.00  150.42  976,895.23 
5018+480.00  0.00  9.07  0.00  17.57  10.00  0.00  0.00  175.71  976,719.52 
5018+500.00  0.00  10.40  0.00  19.47  10.00  0.00  0.00  194.67  976,524.85 
5018+520.00  0.00  10.36  0.00  20.76  10.00  0.00  0.00  207.62  976,317.23 
5018+540.00  0.00  11.33  0.00  21.69  10.00  0.00  0.00  216.91  976,100.32 
5018+560.00  0.00  13.25  0.00  24.58  10.00  0.00  0.00  245.79  975,854.53 
5018+580.00  0.00  12.31  0.00  25.55  10.00  0.00  0.00  255.54  975,598.99 
5018+600.00  0.00  7.20  0.00  19.50  10.00  0.00  0.00  195.01  975,403.98 
5018+620.00  2.06  2.50  2.06  9.70  10.00  20.57  26.74  96.99  975,333.73 
5018+640.00  1.30  2.29  3.36  4.80  10.00  33.55  43.62  47.96  975,329.38 
5018+660.00  0.00  6.24  1.30  8.53  10.00  12.98  16.87  85.34  975,260.92 
5018+680.00  0.00  6.50  0.00  12.74  10.00  0.00  0.00  127.41  975,133.51 
5018+700.00  1.19  3.14  1.19  9.64  10.00  11.94  15.52  96.40  975,052.63 
5018+720.00  9.01  1.08  10.20  4.22  10.00  101.99  132.59  42.16  975,143.06 
5018+740.00  12.34  1.18  21.35  2.25  10.00  213.49  277.54  22.51  975,398.08 
5018+760.00  2.00  2.52  14.34  3.69  10.00  143.39  186.41  36.93  975,547.56 
5018+780.00  0.00  9.30  2.00  11.82  10.00  19.95  25.94  118.21  975,455.28 
5018+800.00  0.00  9.54  0.00  18.85  10.00  0.00  0.00  188.47  975,266.81 
5018+820.00  0.00  7.57  0.00  17.11  10.00  0.00  0.00  171.14  975,095.67 
5018+840.00  0.00  10.34  0.00  17.91  10.00  0.00  0.00  179.13  974,916.54 
5018+860.00  0.00  11.88  0.00  22.22  10.00  0.00  0.00  222.24  974,694.30 
5018+880.00  0.00  12.66  0.00  24.54  10.00  0.00  0.00  245.40  974,448.90 
5018+900.00  0.00  13.97  0.00  26.62  10.00  0.00  0.00  266.24  974,182.66 
5018+920.00  0.00  15.79  0.00  29.75  10.00  0.00  0.00  297.52  973,885.14 
5018+939.87  0.00  15.46  0.00  31.24  9.93  0.00  0.00  310.33  973,574.82 
5018+940.00  0.00  15.46  0.00  30.91  0.07  0.00  0.00  2.07  973,572.75 
5018+960.00  0.00  13.40  0.00  28.85  10.00  0.00  0.00  288.52  973,284.23 
5018+979.87  0.00  12.67  0.00  26.07  9.93  0.00  0.00  258.95  973,025.27 
5018+980.00  0.00  12.67  0.00  25.34  0.07  0.00  0.00  1.70  973,023.58 
5019+000.00  0.00  8.77  0.00  21.43  10.00  0.00  0.00  214.31  972,809.27 
5019+020.00  3.06  7.35  3.06  16.12  10.00  30.61  39.79  161.20  972,687.86 
5019+040.00  10.31  7.39  13.37  14.75  10.00  133.67  173.77  147.48  972,714.15 
5019+060.00  23.10  5.22  33.41  12.62  10.00  334.06  434.28  126.15  973,022.28 
5019+062.97  21.30  5.39  44.40  10.61  1.48  65.86  85.62  15.74  973,092.17 
5019+080.00  8.72  6.76  30.02  12.14  8.52  255.62  332.31  103.42  973,321.06 
5019+100.00  18.48  7.52  27.20  14.27  10.00  271.99  353.59  142.72  973,531.93 
5019+102.97  17.91  7.79  36.40  15.30  1.48  53.99  70.19  22.70  973,579.42 
5019+120.00  12.69  9.36  30.60  17.14  8.52  260.60  338.78  146.01  973,772.18 
5019+140.00  2.25  10.58  14.94  19.93  10.00  149.36  194.17  199.34  973,767.01 
5019+160.00  1.57  13.24  3.82  23.82  10.00  38.20  49.66  238.23  973,578.44 
5019+180.00  9.63  10.58  11.20  23.82  10.00  111.95  145.54  238.22  973,485.76 
5019+200.00  1.86  16.41  11.49  26.99  10.00  114.89  149.36  269.88  973,365.23 
5019+220.00  0.00  21.96  1.86  38.37  10.00  18.63  24.22  383.74  973,005.71 
5019+240.00  0.53  18.06  0.53  40.02  10.00  5.25  6.83  400.24  972,612.30 
5019+260.00  0.00  20.30  0.53  38.36  10.00  5.25  6.83  383.58  972,235.54 

214 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5019+280.00  2.21  21.35  2.21  41.65  10.00  22.14  28.78  416.46  971,847.86 
5019+300.00  0.00  23.47  2.21  44.82  10.00  22.14  28.78  448.19  971,428.46 
5019+320.00  0.00  22.03  0.00  45.50  10.00  0.00  0.00  455.00  970,973.46 
5019+340.00  0.00  27.41  0.00  49.44  10.00  0.00  0.00  494.42  970,479.04 
5019+360.00  0.00  27.05  0.00  54.46  10.00  0.00  0.00  544.60  969,934.44 
5019+380.00  0.00  27.33  0.00  54.38  10.00  0.00  0.00  543.78  969,390.66 
5019+400.00  0.00  22.36  0.00  49.69  10.00  0.00  0.00  496.86  968,893.80 
5019+420.00  8.41  15.42  8.41  37.77  10.00  84.07  109.29  377.72  968,625.37 
5019+440.00  3.84  20.56  12.25  35.97  10.00  122.51  159.26  359.74  968,424.89 
5019+450.00  0.00  23.51  3.84  44.07  5.00  19.22  24.99  220.35  968,229.53 
5019+450.00  0.00  0.00  0.00  23.51  0.00  0.00  0.00  0.00  968,229.53 
5019+450.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  968,229.53 
5019+460.00  0.00  0.00  0.00  0.00  5.00  0.00  0.00  0.00  968,229.53 
5019+478.00  0.00  0.00  0.00  0.00  9.00  0.00  0.00  0.00  968,229.53 
5019+478.00  0.00  50.20  0.00  50.20  0.00  0.00  0.00  0.00  968,229.53 
5019+478.00  0.00  43.91  0.00  94.11  0.00  0.00  0.00  0.05  968,229.48 
5019+480.00  0.00  45.10  0.00  89.01  1.00  0.00  0.00  88.97  968,140.51 
5019+500.00  0.00  70.27  0.00  115.37  10.00  0.00  0.00  1153.67  966,986.84 
5019+520.00  0.00  75.55  0.00  145.81  10.00  0.00  0.00  1458.14  965,528.70 
5019+540.00  0.00  73.99  0.00  149.54  10.00  0.00  0.00  1495.43  964,033.27 
5019+560.00  0.00  69.40  0.00  143.40  10.00  0.00  0.00  1433.96  962,599.31 
5019+580.00  0.00  72.63  0.00  142.03  10.00  0.00  0.00  1420.28  961,179.03 
5019+600.00  0.00  84.76  0.00  157.39  10.00  0.00  0.00  1573.89  959,605.14 
5019+620.00  0.00  103.02  0.00  187.78  10.00  0.00  0.00  1877.82  957,727.32 
5019+640.00  0.00  100.38  0.00  203.40  10.00  0.00  0.00  2033.95  955,693.37 
5019+660.00  0.00  106.71  0.00  207.09  10.00  0.00  0.00  2070.88  953,622.49 
5019+680.00  0.00  98.51  0.00  205.23  10.00  0.00  0.00  2052.25  951,570.24 
5019+700.00  0.00  81.30  0.00  179.81  10.00  0.00  0.00  1798.12  949,772.12 
5019+700.00  0.00  83.68  0.00  164.98  0.00  0.00  0.00  0.00  949,772.12 
5019+720.00  0.00  84.99  0.00  168.67  10.00  0.00  0.00  1686.69  948,085.43 
5019+740.00  0.00  84.46  0.00  169.45  10.00  0.00  0.00  1694.49  946,390.94 
5019+760.00  0.00  81.50  0.00  165.96  10.00  0.00  0.00  1659.61  944,731.33 
5019+780.00  0.00  67.39  0.00  148.90  10.00  0.00  0.00  1488.96  943,242.37 
5019+800.00  0.00  65.16  0.00  132.55  10.00  0.00  0.00  1325.53  941,916.84 
5019+820.00  0.00  69.17  0.00  134.33  10.00  0.00  0.00  1343.25  940,573.59 
5019+840.00  0.00  71.21  0.00  140.37  10.00  0.00  0.00  1403.74  939,169.85 
5019+860.00  0.00  59.06  0.00  130.26  10.00  0.00  0.00  1302.64  937,867.21 
5019+880.00  0.00  58.68  0.00  117.73  10.00  0.00  0.00  1177.31  936,689.90 
5019+900.00  0.00  47.88  0.00  106.55  10.00  0.00  0.00  1065.50  935,624.40 
5019+920.00  0.00  44.27  0.00  92.14  10.00  0.00  0.00  921.40  934,703.00 
5019+940.00  0.00  29.94  0.00  74.21  10.00  0.00  0.00  742.06  933,960.94 
5019+960.00  0.00  22.00  0.00  51.94  10.00  0.00  0.00  519.38  933,441.56 
5019+980.00  0.00  17.59  0.00  39.58  10.00  0.00  0.00  395.83  933,045.73 
5020+000.00  0.00  12.04  0.00  29.63  10.00  0.00  0.00  296.30  932,749.43 
5020+020.00  0.00  11.05  0.00  23.10  10.00  0.00  0.00  230.98  932,518.45 

215 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5020+040.00  0.00  18.01  0.00  29.06  10.00  0.00  0.00  290.64  932,227.81 
5020+060.00  0.00  21.06  0.00  39.07  10.00  0.00  0.00  390.65  931,837.16 
5020+080.00  0.00  17.82  0.00  38.88  10.00  0.00  0.00  388.79  931,448.37 
5020+100.00  0.00  14.76  0.00  32.58  10.00  0.00  0.00  325.80  931,122.57 
5020+120.00  0.00  14.18  0.00  28.93  10.00  0.00  0.00  289.34  930,833.23 
5020+140.00  0.00  15.89  0.00  30.07  10.00  0.00  0.00  300.71  930,532.52 
5020+160.00  0.00  16.84  0.00  32.73  10.00  0.00  0.00  327.30  930,205.22 
5020+180.00  0.00  16.31  0.00  33.14  10.00  0.00  0.00  331.42  929,873.80 
5020+200.00  0.00  19.04  0.00  35.35  10.00  0.00  0.00  353.48  929,520.32 
5020+220.00  0.00  21.91  0.00  40.95  10.00  0.00  0.00  409.50  929,110.82 
5020+240.00  0.00  21.39  0.00  43.30  10.00  0.00  0.00  432.97  928,677.85 
5020+260.00  0.00  29.49  0.00  50.88  10.00  0.00  0.00  508.78  928,169.07 
5020+280.00  0.00  28.46  0.00  57.94  10.00  0.00  0.00  579.44  927,589.63 
5020+300.00  0.00  27.41  0.00  55.86  10.00  0.00  0.00  558.62  927,031.01 
5020+320.00  0.00  28.07  0.00  55.47  10.00  0.00  0.00  554.74  926,476.27 
5020+340.00  0.00  18.36  0.00  46.43  10.00  0.00  0.00  464.25  926,012.02 
5020+360.00  0.00  14.23  0.00  32.59  10.00  0.00  0.00  325.91  925,686.11 
5020+380.00  1.80  9.56  1.80  23.80  10.00  17.95  23.34  237.95  925,471.50 
5020+400.00  0.47  9.58  2.27  19.14  10.00  22.68  29.48  191.36  925,309.62 
5020+420.00  3.28  4.56  3.75  14.13  10.00  37.49  48.74  141.33  925,217.03 
5020+440.00  8.98  1.80  12.25  6.35  10.00  122.51  159.26  63.53  925,312.76 
5020+460.00  19.83  0.79  28.80  2.58  10.00  288.01  374.41  25.84  925,661.34 
5020+480.00  20.61  0.97  40.43  1.76  10.00  404.34  525.64  17.60  926,169.38 
5020+500.00  19.77  0.64  40.38  1.61  10.00  403.80  524.94  16.06  926,678.26 
5020+520.00  13.92  1.63  33.69  2.27  10.00  336.90  437.97  22.69  927,093.54 
5020+540.00  9.15  2.04  23.07  3.68  10.00  230.65  299.85  36.75  927,356.63 
5020+560.00  3.13  2.68  12.27  4.73  10.00  122.72  159.54  47.25  927,468.92 
5020+580.00  2.29  3.44  5.42  6.12  10.00  54.17  70.42  61.21  927,478.13 
5020+600.00  4.79  3.70  7.08  7.13  10.00  70.80  92.04  71.34  927,498.83 
5020+620.00  2.03  2.83  6.82  6.53  10.00  68.18  88.63  65.28  927,522.18 
5020+640.00  1.45  2.32  3.48  5.15  10.00  34.82  45.27  51.46  927,515.99 
5020+660.00  2.91  2.49  4.36  4.80  10.00  43.59  56.67  48.02  927,524.64 
5020+680.00  2.57  2.53  5.48  5.02  10.00  54.76  71.19  50.21  927,545.61 
5020+700.00  2.76  2.13  5.33  4.67  10.00  53.28  69.26  46.68  927,568.20 
5020+720.00  0.75  2.94  3.51  5.07  10.00  35.08  45.60  50.72  927,563.08 
5020+740.00  0.82  4.21  1.57  7.15  10.00  15.68  20.38  71.47  927,512.00 
5020+760.00  0.00  9.09  0.82  13.30  10.00  8.19  10.65  133.03  927,389.61 
5020+780.00  0.00  10.97  0.00  20.06  10.00  0.00  0.00  200.60  927,189.01 
5020+800.00  0.00  15.47  0.00  26.44  10.00  0.00  0.00  264.36  926,924.65 
5020+820.00  0.00  13.38  0.00  28.85  10.00  0.00  0.00  288.46  926,636.19 
5020+840.00  0.00  13.02  0.00  26.39  10.00  0.00  0.00  263.92  926,372.27 
5020+860.00  0.00  17.10  0.00  30.11  10.00  0.00  0.00  301.12  926,071.15 
5020+880.00  0.00  14.25  0.00  31.35  10.00  0.00  0.00  313.45  925,757.70 
5020+900.00  0.00  9.33  0.00  23.58  10.00  0.00  0.00  235.75  925,521.95 
5020+920.00  0.41  5.63  0.41  14.95  10.00  4.12  5.36  149.53  925,377.78 

216 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5020+940.00  3.93  2.06  4.35  7.69  10.00  43.46  56.50  76.85  925,357.43 
5020+960.00  6.35  2.36  10.28  4.42  10.00  102.81  133.65  44.20  925,446.88 
5020+980.00  12.97  0.39  19.31  2.76  10.00  193.14  251.08  27.56  925,670.40 
5021+000.00  14.14  0.93  27.11  1.32  10.00  271.06  352.38  13.23  926,009.55 
5021+020.00  13.23  1.35  27.36  2.28  10.00  273.64  355.73  22.75  926,342.53 
5021+040.00  17.65  1.48  30.88  2.83  10.00  308.78  401.41  28.29  926,715.66 
5021+060.00  10.62  2.81  28.28  4.30  10.00  282.76  367.59  42.95  927,040.29 
5021+080.00  0.00  7.44  10.62  10.25  10.00  106.23  138.10  102.52  927,075.87 
5021+100.00  0.00  9.38  0.00  16.82  10.00  0.00  0.00  168.18  926,907.69 
5021+120.00  0.00  11.73  0.00  21.11  10.00  0.00  0.00  211.12  926,696.57 
5021+140.00  0.00  15.57  0.00  27.31  10.00  0.00  0.00  273.08  926,423.49 
5021+160.00  0.00  21.93  0.00  37.51  10.00  0.00  0.00  375.05  926,048.44 
5021+180.00  0.00  27.50  0.00  49.44  10.00  0.00  0.00  494.35  925,554.09 
5021+200.00  0.00  28.80  0.00  56.30  10.00  0.00  0.00  563.01  924,991.08 
5021+220.00  0.00  38.93  0.00  67.72  10.00  0.00  0.00  677.22  924,313.86 
5021+240.00  0.00  41.18  0.00  80.11  10.00  0.00  0.00  801.08  923,512.78 
5021+260.00  0.00  39.03  0.00  80.21  10.00  0.00  0.00  802.11  922,710.67 
5021+280.00  0.00  40.72  0.00  79.75  10.00  0.00  0.00  797.47  921,913.20 
5021+300.00  0.00  43.34  0.00  84.05  10.00  0.00  0.00  840.54  921,072.66 
5021+320.00  0.00  41.70  0.00  85.04  10.00  0.00  0.00  850.35  920,222.31 
5021+340.00  0.00  43.12  0.00  84.82  10.00  0.00  0.00  848.15  919,374.16 
5021+360.00  0.00  46.34  0.00  89.46  10.00  0.00  0.00  894.56  918,479.60 
5021+380.00  0.00  45.70  0.00  92.04  10.00  0.00  0.00  920.39  917,559.21 
5021+400.00  0.00  43.72  0.00  89.42  10.00  0.00  0.00  894.20  916,665.01 
5021+420.00  0.00  43.50  0.00  87.22  10.00  0.00  0.00  872.21  915,792.80 
5021+440.00  0.00  44.60  0.00  88.10  10.00  0.00  0.00  881.02  914,911.78 
5021+460.00  0.00  47.41  0.00  92.01  10.00  0.00  0.00  920.14  913,991.64 
5021+480.00  0.00  43.95  0.00  91.36  10.00  0.00  0.00  913.58  913,078.06 
5021+500.00  0.00  32.32  0.00  76.26  10.00  0.00  0.00  762.62  912,315.44 
5021+520.00  6.73  24.38  6.73  56.70  10.00  67.31  87.50  566.99  911,835.96 
5021+540.00  10.60  24.13  17.33  48.51  10.00  173.29  225.28  485.09  911,576.14 
5021+560.00  29.88  21.21  40.48  45.33  10.00  404.80  526.24  453.30  911,649.08 
5021+560.00  33.90  21.85  63.79  43.05  0.00  0.00  0.00  0.00  911,649.08 
5021+580.00  11.61  25.27  45.52  47.11  10.00  455.15  591.70  471.14  911,769.64 
5021+600.00  36.62  18.17  48.24  43.44  10.00  482.35  627.06  434.37  911,962.32 
5021+620.00  28.51  20.21  65.14  38.38  10.00  651.35  846.76  383.83  912,425.25 
5021+640.00  0.00  28.63  28.51  48.84  10.00  285.11  370.64  488.38  912,307.51 
5021+660.00  0.00  50.16  0.00  78.79  10.00  0.00  0.00  787.87  911,519.64 
5021+680.00  0.00  60.46  0.00  110.62  10.00  0.00  0.00  1106.19  910,413.45 
5021+700.00  0.00  71.84  0.00  132.30  10.00  0.00  0.00  1322.96  909,090.49 
5021+720.00  0.00  67.64  0.00  139.48  10.00  0.00  0.00  1394.78  907,695.71 
5021+740.00  0.00  71.25  0.00  138.89  10.00  0.00  0.00  1388.94  906,306.77 
5021+760.00  0.00  83.46  0.00  154.71  10.00  0.00  0.00  1547.11  904,759.66 
5021+780.00  0.00  89.17  0.00  172.62  10.00  0.00  0.00  1726.24  903,033.42 
5021+800.00  0.00  86.04  0.00  175.20  10.00  0.00  0.00  1752.03  901,281.39 

217 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5021+820.00  0.00  78.64  0.00  164.68  10.00  0.00  0.00  1646.75  899,634.64 
5021+840.00  0.00  82.94  0.00  161.58  10.00  0.00  0.00  1615.80  898,018.84 
5021+860.00  0.00  74.34  0.00  157.28  10.00  0.00  0.00  1572.84  896,446.00 
5021+880.00  0.00  80.32  0.00  154.67  10.00  0.00  0.00  1546.66  894,899.34 
5021+900.00  0.00  81.02  0.00  161.34  10.00  0.00  0.00  1613.42  893,285.92 
5021+920.00  0.00  79.67  0.00  160.69  10.00  0.00  0.00  1606.89  891,679.03 
5021+920.00  0.00  70.08  0.00  149.76  0.00  0.00  0.00  0.00  891,679.03 
5021+940.00  0.00  77.44  0.00  147.53  10.00  0.00  0.00  1475.26  890,203.77 
5021+960.00  0.00  81.29  0.00  158.74  10.00  0.00  0.00  1587.36  888,616.41 
5021+980.00  0.00  75.37  0.00  156.67  10.00  0.00  0.00  1566.67  887,049.74 
5022+000.00  0.00  49.61  0.00  124.98  10.00  0.00  0.00  1249.82  885,799.92 
5022+020.00  0.00  62.13  0.00  111.74  10.00  0.00  0.00  1117.36  884,682.56 
5022+040.00  0.00  60.76  0.00  122.88  10.00  0.00  0.00  1228.84  883,453.72 
5022+060.00  0.00  63.33  0.00  124.08  10.00  0.00  0.00  1240.82  882,212.90 
5022+080.00  0.00  65.70  0.00  129.02  10.00  0.00  0.00  1290.22  880,922.68 
5022+100.00  0.00  55.45  0.00  121.14  10.00  0.00  0.00  1211.42  879,711.26 
5022+120.00  0.00  58.28  0.00  113.72  10.00  0.00  0.00  1137.22  878,574.04 
5022+140.00  0.00  46.33  0.00  104.61  10.00  0.00  0.00  1046.11  877,527.93 
5022+160.00  0.00  39.34  0.00  85.68  10.00  0.00  0.00  856.76  876,671.17 
5022+180.00  0.00  41.53  0.00  80.88  10.00  0.00  0.00  808.75  875,862.42 
5022+200.00  0.00  26.99  0.00  68.52  10.00  0.00  0.00  685.18  875,177.24 
5022+220.00  0.00  25.91  0.00  52.90  10.00  0.00  0.00  528.98  874,648.26 
5022+240.00  0.00  21.98  0.00  47.90  10.00  0.00  0.00  478.97  874,169.29 
5022+260.00  0.00  22.27  0.00  44.25  10.00  0.00  0.00  442.50  873,726.79 
5022+280.00  0.00  16.69  0.00  38.96  10.00  0.00  0.00  389.56  873,337.23 
5022+280.00  0.00  18.82  0.00  35.51  0.00  0.00  0.00  0.00  873,337.23 
5022+300.00  0.00  21.20  0.00  40.02  10.00  0.00  0.00  400.20  872,937.03 
5022+320.00  0.00  17.34  0.00  38.54  10.00  0.00  0.00  385.37  872,551.66 
5022+340.00  0.00  14.77  0.00  32.11  10.00  0.00  0.00  321.07  872,230.59 
5022+360.00  0.00  12.68  0.00  27.45  10.00  0.00  0.00  274.50  871,956.09 
5022+380.00  0.00  12.78  0.00  25.45  10.00  0.00  0.00  254.54  871,701.55 
5022+400.00  0.00  12.30  0.00  25.08  10.00  0.00  0.00  250.77  871,450.78 
5022+420.00  0.00  10.56  0.00  22.86  10.00  0.00  0.00  228.56  871,222.22 
5022+440.00  0.00  7.55  0.00  18.11  10.00  0.00  0.00  181.06  871,041.16 
5022+460.00  0.01  6.37  0.01  13.92  10.00  0.10  0.13  139.18  870,902.11 
5022+480.00  0.26  5.00  0.27  11.36  10.00  2.72  3.54  113.62  870,792.03 
5022+490.00  0.31  4.37  0.57  9.36  5.00  2.84  3.69  46.82  870,748.90 
5022+490.00  0.07  5.05  0.38  9.41  0.00  0.00  0.00  0.00  870,748.90 
5022+500.00  0.09  4.43  0.16  9.47  5.00  0.82  1.07  47.37  870,702.61 
5022+520.00  0.03  3.92  0.12  8.35  10.00  1.23  1.60  83.51  870,620.69 
5022+540.00  0.21  3.26  0.24  7.18  10.00  2.40  3.12  71.83  870,551.98 
5022+560.00  0.23  3.83  0.43  7.09  10.00  4.34  5.64  70.90  870,486.73 
5022+580.00  0.00  7.85  0.23  11.68  10.00  2.26  2.94  116.75  870,372.91 
5022+600.00  0.00  7.51  0.00  15.36  10.00  0.00  0.00  153.56  870,219.35 
5022+620.00  0.00  6.38  0.00  13.89  10.00  0.00  0.00  138.86  870,080.49 

218 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5022+640.00  0.00  9.23  0.00  15.61  10.00  0.00  0.00  156.06  869,924.43 
5022+660.00  0.00  9.68  0.00  18.91  10.00  0.00  0.00  189.08  869,735.35 
5022+680.00  0.00  8.30  0.00  17.97  10.00  0.00  0.00  179.73  869,555.62 
5022+685.75  0.00  8.04  0.00  16.34  2.87  0.00  0.00  46.93  869,508.70 
5022+700.00  0.00  7.10  0.00  15.14  7.13  0.00  0.00  107.92  869,400.78 
5022+715.75  0.00  6.23  0.00  13.33  7.87  0.00  0.00  104.97  869,295.81 
5022+720.00  0.00  5.99  0.00  12.22  2.13  0.00  0.00  26.01  869,269.80 
5022+740.00  0.00  8.90  0.00  14.89  10.00  0.00  0.00  148.87  869,120.93 
5022+760.00  0.00  7.93  0.00  16.82  10.00  0.00  0.00  168.22  868,952.71 
5022+780.00  0.00  13.20  0.00  21.13  10.00  0.00  0.00  211.28  868,741.43 
5022+800.00  0.00  12.84  0.00  26.04  10.00  0.00  0.00  260.42  868,481.01 
5022+800.10  0.00  12.84  0.00  25.68  0.05  0.00  0.00  1.30  868,479.71 
5022+820.00  0.00  13.73  0.00  26.57  9.95  0.00  0.00  264.39  868,215.33 
5022+830.10  0.00  11.53  0.00  25.26  5.05  0.00  0.00  127.57  868,087.76 
5022+840.00  0.00  10.94  0.00  22.47  4.95  0.00  0.00  111.19  867,976.57 
5022+860.00  0.00  13.33  0.00  24.27  10.00  0.00  0.00  242.65  867,733.92 
5022+880.00  0.00  9.64  0.00  22.97  10.00  0.00  0.00  229.65  867,504.27 
5022+900.00  0.00  10.14  0.00  19.77  10.00  0.00  0.00  197.73  867,306.54 
5022+920.00  0.00  9.13  0.00  19.27  10.00  0.00  0.00  192.69  867,113.85 
5022+940.00  0.00  12.64  0.00  21.77  10.00  0.00  0.00  217.68  866,896.17 
5022+960.00  0.00  9.41  0.00  22.04  10.00  0.00  0.00  220.42  866,675.75 
5022+980.00  0.00  10.85  0.00  20.25  10.00  0.00  0.00  202.53  866,473.22 
5023+000.00  0.00  9.32  0.00  20.17  10.00  0.00  0.00  201.68  866,271.54 
5023+020.00  0.00  8.42  0.00  17.74  10.00  0.00  0.00  177.42  866,094.12 
5023+040.00  0.00  8.03  0.00  16.45  10.00  0.00  0.00  164.49  865,929.63 
5023+060.00  0.00  12.90  0.00  20.93  10.00  0.00  0.00  209.32  865,720.31 
5023+080.00  0.00  19.37  0.00  32.27  10.00  0.00  0.00  322.71  865,397.60 
5023+100.00  0.00  18.02  0.00  37.39  10.00  0.00  0.00  373.87  865,023.73 
5023+100.00  0.00  18.02  0.00  36.04  0.00  0.00  0.00  0.00  865,023.73 
5023+120.00  0.00  21.00  0.00  39.02  10.00  0.00  0.00  390.24  864,633.49 
5023+140.00  0.00  27.06  0.00  48.06  10.00  0.00  0.00  480.60  864,152.89 
5023+160.00  0.00  23.26  0.00  50.31  10.00  0.00  0.00  503.13  863,649.76 
5023+180.00  0.00  21.50  0.00  44.76  10.00  0.00  0.00  447.56  863,202.20 
5023+200.00  0.00  22.47  0.00  43.97  10.00  0.00  0.00  439.70  862,762.50 
5023+220.00  0.00  19.37  0.00  41.84  10.00  0.00  0.00  418.43  862,344.07 
5023+220.00  0.00  19.37  0.00  38.74  0.00  0.00  0.00  0.00  862,344.07 
5023+240.00  0.00  9.43  0.00  28.80  10.00  0.00  0.00  288.00  862,056.07 
5023+260.00  0.00  9.64  0.00  19.07  10.00  0.00  0.00  190.70  861,865.37 
5023+280.00  0.00  14.72  0.00  24.36  10.00  0.00  0.00  243.63  861,621.74 
5023+300.00  0.00  16.06  0.00  30.78  10.00  0.00  0.00  307.77  861,313.97 
5023+320.00  0.00  16.33  0.00  32.39  10.00  0.00  0.00  323.88  860,990.09 
5023+340.00  0.00  15.65  0.00  31.98  10.00  0.00  0.00  319.78  860,670.31 
5023+360.00  0.00  14.45  0.00  30.10  10.00  0.00  0.00  300.98  860,369.33 
5023+380.00  0.00  14.60  0.00  29.06  10.00  0.00  0.00  290.56  860,078.77 
5023+400.00  0.00  8.74  0.00  23.34  10.00  0.00  0.00  233.39  859,845.38 

219 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5023+420.00  0.00  6.47  0.00  15.20  10.00  0.00  0.00  152.01  859,693.37 
5023+440.00  0.00  6.34  0.00  12.81  10.00  0.00  0.00  128.09  859,565.28 
5023+460.00  0.00  6.57  0.00  12.91  10.00  0.00  0.00  129.10  859,436.18 
5023+480.00  0.00  8.91  0.00  15.47  10.00  0.00  0.00  154.72  859,281.46 
5023+500.00  0.00  12.86  0.00  21.77  10.00  0.00  0.00  217.66  859,063.80 
5023+520.00  0.00  9.73  0.00  22.59  10.00  0.00  0.00  225.89  858,837.91 
5023+540.00  0.00  9.00  0.00  18.72  10.00  0.00  0.00  187.23  858,650.68 
5023+560.00  0.75  7.74  0.75  16.73  10.00  7.52  9.78  167.30  858,493.16 
5023+580.00  0.00  7.12  0.75  14.85  10.00  7.52  9.78  148.51  858,354.42 
5023+600.00  0.00  9.00  0.00  16.11  10.00  0.00  0.00  161.11  858,193.31 
5023+620.00  0.00  9.97  0.00  18.97  10.00  0.00  0.00  189.69  858,003.62 
5023+640.00  0.00  13.74  0.00  23.72  10.00  0.00  0.00  237.18  857,766.44 
5023+660.00  0.00  12.82  0.00  26.56  10.00  0.00  0.00  265.63  857,500.81 
5023+680.00  0.00  14.56  0.00  27.38  10.00  0.00  0.00  273.75  857,227.06 
5023+700.00  0.00  15.65  0.00  30.21  10.00  0.00  0.00  302.05  856,925.01 
5023+720.00  0.00  11.61  0.00  27.26  10.00  0.00  0.00  272.61  856,652.40 
5023+740.00  0.00  12.06  0.00  23.68  10.00  0.00  0.00  236.75  856,415.65 
5023+760.00  0.00  8.76  0.00  20.82  10.00  0.00  0.00  208.22  856,207.43 
5023+770.00  0.00  7.57  0.00  16.33  5.00  0.00  0.00  81.63  856,125.80 
5023+770.00  0.00  7.57  0.00  15.13  0.00  0.00  0.00  0.00  856,125.80 
5023+780.00  0.00  7.09  0.00  14.66  5.00  0.00  0.00  73.30  856,052.51 
5023+800.00  0.00  8.90  0.00  15.99  10.00  0.00  0.00  159.92  855,892.59 
5023+820.00  0.00  6.79  0.00  15.69  10.00  0.00  0.00  156.92  855,735.67 
5023+840.00  0.00  9.65  0.00  16.44  10.00  0.00  0.00  164.41  855,571.26 
5023+860.00  0.00  13.03  0.00  22.68  10.00  0.00  0.00  226.76  855,344.50 
5023+880.00  0.00  9.21  0.00  22.24  10.00  0.00  0.00  222.37  855,122.13 
5023+900.00  0.00  15.11  0.00  24.32  10.00  0.00  0.00  243.16  854,878.97 
5023+900.00  0.00  15.11  0.00  30.21  0.00  0.00  0.00  0.00  854,878.97 
5023+920.00  0.00  15.99  0.00  31.09  10.00  0.00  0.00  310.94  854,568.03 
5023+940.00  0.16  4.44  0.16  20.43  10.00  1.63  2.12  204.28  854,365.87 
5023+960.00  1.25  2.39  1.42  6.83  10.00  14.16  18.41  68.31  854,315.96 
5023+980.00  0.17  5.53  1.42  7.92  10.00  14.21  18.47  79.20  854,255.24 
5024+000.00  1.10  3.12  1.27  8.65  10.00  12.71  16.52  86.48  854,185.28 
5024+007.22  1.16  4.10  2.26  7.22  3.61  8.17  10.62  26.07  854,169.83 
5024+020.00  1.22  6.22  2.37  10.32  6.39  15.17  19.72  65.95  854,123.59 
5024+040.00  0.50  8.48  1.72  14.71  10.00  17.15  22.30  147.08  853,998.80 
5024+060.00  0.02  7.71  0.52  16.19  10.00  5.16  6.71  161.94  853,843.57 
5024+080.00  0.00  10.93  0.02  18.64  10.00  0.16  0.21  186.37  853,657.41 
5024+100.00  0.00  12.32  0.00  23.25  10.00  0.00  0.00  232.51  853,424.90 
5024+120.00  0.57  2.85  0.57  15.17  10.00  5.69  7.40  151.74  853,280.56 
5024+137.22  0.94  2.51  1.51  5.36  8.61  12.96  16.85  46.14  853,251.26 
5024+140.00  1.02  2.42  1.95  4.92  1.39  2.71  3.52  6.84  853,247.95 
5024+160.00  0.50  2.63  1.51  5.04  10.00  15.13  19.67  50.40  853,217.22 
5024+180.00  0.00  5.91  0.50  8.54  10.00  4.98  6.47  85.35  853,138.34 
5024+200.00  0.56  8.20  0.56  14.11  10.00  5.61  7.29  141.10  853,004.54 

220 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5024+220.00  0.00  12.19  0.56  20.39  10.00  5.61  7.29  203.90  852,807.93 
5024+240.00  0.00  20.54  0.00  32.73  10.00  0.00  0.00  327.33  852,480.60 
5024+250.00  0.00  21.85  0.00  42.39  5.00  0.00  0.00  211.97  852,268.63 
5024+260.00  0.00  21.98  0.00  43.83  5.00  0.00  0.00  219.14  852,049.50 
5024+280.00  0.00  19.13  0.00  41.11  10.00  0.00  0.00  411.08  851,638.42 
5024+300.00  0.00  19.34  0.00  38.47  10.00  0.00  0.00  384.73  851,253.69 
5024+320.00  0.00  18.01  0.00  37.35  10.00  0.00  0.00  373.48  850,880.21 
5024+340.00  0.00  14.63  0.00  32.64  10.00  0.00  0.00  326.40  850,553.81 
5024+360.00  0.00  12.59  0.00  27.22  10.00  0.00  0.00  272.24  850,281.57 
5024+380.00  0.00  11.16  0.00  23.75  10.00  0.00  0.00  237.49  850,044.08 
5024+400.00  0.00  9.12  0.00  20.28  10.00  0.00  0.00  202.79  849,841.29 
5024+420.00  0.00  11.09  0.00  20.21  10.00  0.00  0.00  202.12  849,639.17 
5024+440.00  0.00  14.95  0.00  26.04  10.00  0.00  0.00  260.44  849,378.73 
5024+460.00  0.00  13.97  0.00  28.92  10.00  0.00  0.00  289.17  849,089.56 
5024+480.00  0.00  13.95  0.00  27.91  10.00  0.00  0.00  279.11  848,810.45 
5024+500.00  0.00  13.90  0.00  27.85  10.00  0.00  0.00  278.49  848,531.96 
5024+515.53  0.00  14.41  0.00  28.32  7.76  0.00  0.00  219.80  848,312.16 
5024+520.00  0.00  16.56  0.00  30.97  2.24  0.00  0.00  69.30  848,242.87 
5024+535.53  0.00  19.87  0.00  36.43  7.76  0.00  0.00  282.81  847,960.06 
5024+540.00  0.00  19.22  0.00  39.10  2.24  0.00  0.00  87.48  847,872.57 
5024+560.00  0.00  15.10  0.00  34.33  10.00  0.00  0.00  343.25  847,529.32 
5024+580.00  0.00  15.64  0.00  30.74  10.00  0.00  0.00  307.40  847,221.92 
5024+588.65  0.00  17.61  0.00  33.25  4.32  0.00  0.00  143.77  847,078.16 
5024+600.00  0.00  19.72  0.00  37.33  5.68  0.00  0.00  211.87  846,866.29 
5024+620.00  0.00  18.13  0.00  37.85  10.00  0.00  0.00  378.48  846,487.81 
5024+640.00  0.72  12.31  0.72  30.44  10.00  7.22  9.39  304.43  846,192.76 
5024+640.00  0.80  11.40  1.53  23.71  0.00  0.00  0.00  0.00  846,192.76 
5024+660.00  2.19  10.82  2.99  22.22  10.00  29.93  38.91  222.20  846,009.47 
5024+680.00  2.22  11.59  4.40  22.41  10.00  44.04  57.25  224.07  845,842.65 
5024+700.00  0.00  19.62  2.22  31.21  10.00  22.15  28.80  312.07  845,559.38 
5024+718.65  0.00  24.74  0.00  44.36  9.32  0.00  0.00  413.63  845,145.75 
5024+720.00  0.00  25.17  0.00  49.91  0.68  0.00  0.00  33.74  845,112.01 
5024+740.00  0.00  36.28  0.00  61.44  10.00  0.00  0.00  614.43  844,497.58 
5024+760.00  0.00  44.40  0.00  80.67  10.00  0.00  0.00  806.71  843,690.87 
5024+780.00  0.00  47.09  0.00  91.49  10.00  0.00  0.00  914.87  842,776.00 
5024+800.00  0.00  49.61  0.00  96.71  10.00  0.00  0.00  967.05  841,808.95 
5024+815.00  0.00  36.92  0.00  86.53  7.50  0.00  0.00  648.96  841,159.99 
5024+820.00  0.00  32.75  0.00  69.66  2.50  0.00  0.00  174.15  840,985.84 
5024+825.00  0.00  28.50  0.00  61.24  2.50  0.00  0.00  153.11  840,832.73 
5024+835.00  0.00  20.83  0.00  49.32  5.00  0.00  0.00  246.62  840,586.11 
5024+840.00  0.00  17.42  0.00  38.25  2.50  0.00  0.00  95.62  840,490.49 
5024+845.00  0.00  16.14  0.00  33.56  2.50  0.00  0.00  83.90  840,406.59 
5024+855.00  0.00  14.01  0.00  30.15  5.00  0.00  0.00  150.75  840,255.84 
5024+860.00  0.00  13.05  0.00  27.07  2.50  0.00  0.00  67.66  840,188.18 
5024+865.00  0.00  12.92  0.00  25.97  2.50  0.00  0.00  64.93  840,123.25 

221 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5024+875.00  0.00  12.75  0.00  25.67  5.00  0.00  0.00  128.35  839,994.90 
5024+880.00  0.00  12.69  0.00  25.44  2.50  0.00  0.00  63.60  839,931.30 
5024+885.00  0.00  14.43  0.00  27.12  2.50  0.00  0.00  67.81  839,863.49 
5024+895.00  0.00  18.14  0.00  32.57  5.00  0.00  0.00  162.85  839,700.65 
5024+900.00  0.00  20.11  0.00  38.25  2.50  0.00  0.00  95.62  839,605.03 
5024+905.00  0.00  21.61  0.00  41.72  2.50  0.00  0.00  104.31  839,500.72 
5024+915.00  0.00  24.62  0.00  46.23  5.00  0.00  0.00  231.17  839,269.55 
5024+920.00  0.00  26.03  0.00  50.65  2.50  0.00  0.00  126.62  839,142.93 
5024+925.00  0.00  25.69  0.00  51.72  2.50  0.00  0.00  129.30  839,013.63 
5024+935.00  0.00  24.78  0.00  50.47  5.00  0.00  0.00  252.35  838,761.28 
5024+940.00  0.00  24.25  0.00  49.03  2.50  0.00  0.00  122.58  838,638.70 
5024+945.00  0.00  23.58  0.00  47.83  2.50  0.00  0.00  119.58  838,519.12 
5024+955.00  0.00  22.26  0.00  45.84  5.00  0.00  0.00  229.20  838,289.92 
5024+960.00  0.00  21.62  0.00  43.88  2.50  0.00  0.00  109.70  838,180.22 
5024+980.00  0.00  14.00  0.00  35.62  10.00  0.00  0.00  356.17  837,824.05 
5025+000.00  0.00  8.23  0.00  22.22  10.00  0.00  0.00  222.23  837,601.82 
5025+000.00  0.00  7.13  0.00  15.35  0.00  0.00  0.00  0.00  837,601.82 
5025+020.00  1.56  9.62  1.56  16.74  10.00  15.56  20.23  167.44  837,454.61 
5025+040.00  3.68  8.97  5.24  18.59  10.00  52.37  68.08  185.92  837,336.77 
5025+060.00  3.33  3.66  7.01  12.63  10.00  70.10  91.13  126.30  837,301.60 
5025+080.00  2.66  8.15  5.99  11.81  10.00  59.93  77.91  118.09  837,261.42 
5025+100.00  0.64  10.20  3.31  18.35  10.00  33.08  43.00  183.53  837,120.89 
5025+120.00  0.96  5.60  1.60  15.80  10.00  15.99  20.79  157.97  836,983.71 
5025+140.00  1.20  5.57  2.16  11.16  10.00  21.58  28.05  111.62  836,900.14 
5025+160.00  0.62  7.18  1.83  12.75  10.00  18.26  23.74  127.49  836,796.39 
5025+180.00  2.46  7.17  3.08  14.35  10.00  30.81  40.05  143.50  836,692.94 
5025+200.00  2.88  9.31  5.33  16.48  10.00  53.33  69.33  164.80  836,597.47 
5025+220.00  1.59  10.89  4.47  20.21  10.00  44.68  58.08  202.07  836,453.49 
5025+240.00  2.11  10.23  3.70  21.13  10.00  37.01  48.11  211.25  836,290.35 
5025+260.00  3.22  9.96  5.33  20.19  10.00  53.31  69.30  201.86  836,157.79 
5025+270.00  3.06  9.70  6.29  19.66  5.00  31.43  40.86  98.28  836,100.38 
5025+280.00  3.00  9.30  6.07  19.00  5.00  30.33  39.42  95.02  836,044.78 
5025+290.00  2.52  8.41  5.52  17.71  5.00  27.62  35.90  88.57  835,992.11 
5025+300.00  2.89  7.17  5.41  15.57  5.00  27.04  35.15  77.87  835,949.39 
5025+310.00  3.11  5.93  6.00  13.10  5.00  29.98  38.97  65.48  835,922.88 
5025+320.00  3.41  4.80  6.52  10.73  5.00  32.62  42.40  53.65  835,911.63 
5025+330.00  4.01  4.34  7.42  9.14  5.00  37.12  48.26  45.70  835,914.19 
5025+340.00  4.37  3.89  8.38  8.24  5.00  41.89  54.45  41.18  835,927.46 
5025+350.00  1.99  3.56  6.36  7.46  5.00  31.79  41.33  37.28  835,931.51 
5025+360.00  0.14  4.15  2.13  7.71  5.00  10.65  13.85  38.55  835,906.81 
5025+370.00  0.23  4.26  0.37  8.40  5.00  1.86  2.41  42.02  835,867.20 
5025+380.00  0.33  4.62  0.56  8.88  5.00  2.81  3.65  44.40  835,826.45 
5025+390.00  0.24  4.87  0.57  9.49  5.00  2.86  3.72  47.47  835,782.70 
5025+400.00  0.16  5.33  0.40  10.20  5.00  2.02  2.62  50.99  835,734.34 
5025+420.00  0.00  5.53  0.16  10.86  10.00  1.60  2.08  108.57  835,627.85 

222 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5025+440.00  0.00  7.84  0.00  13.37  10.00  0.00  0.00  133.66  835,494.19 
5025+460.00  0.00  10.45  0.00  18.29  10.00  0.00  0.00  182.89  835,311.30 
5025+480.00  0.00  7.02  0.00  17.47  10.00  0.00  0.00  174.73  835,136.57 
5025+500.00  0.00  9.46  0.00  16.48  10.00  0.00  0.00  164.82  834,971.75 
5025+520.00  0.00  8.07  0.00  17.54  10.00  0.00  0.00  175.35  834,796.40 
5025+521.36  0.00  8.15  0.00  16.22  0.68  0.00  0.00  11.01  834,785.39 
5025+540.00  0.27  7.32  0.27  15.47  9.32  2.49  3.24  144.18  834,644.44 
5025+541.36  0.42  7.33  0.69  14.65  0.68  0.47  0.61  9.95  834,635.10 
5025+550.36  0.39  7.27  0.81  14.60  4.50  3.64  4.73  65.71  834,574.13 
5025+560.00  0.34  7.27  0.73  14.54  4.82  3.51  4.57  70.11  834,508.59 
5025+580.00  0.00  6.82  0.34  14.09  10.00  3.40  4.42  140.92  834,372.09 
5025+600.00  0.00  6.31  0.00  13.13  10.00  0.00  0.00  131.27  834,240.82 
5025+620.00  0.00  6.34  0.00  12.65  10.00  0.00  0.00  126.52  834,114.30 
5025+640.00  0.00  8.98  0.00  15.32  10.00  0.00  0.00  153.24  833,961.06 
5025+640.36  0.00  9.07  0.00  18.05  0.18  0.00  0.00  3.24  833,957.82 
5025+660.00  0.00  14.52  0.00  23.59  9.82  0.00  0.00  231.70  833,726.12 
5025+680.00  0.00  15.25  0.00  29.77  10.00  0.00  0.00  297.69  833,428.43 
5025+700.00  0.00  17.96  0.00  33.21  10.00  0.00  0.00  332.09  833,096.34 
5025+720.00  0.00  18.36  0.00  36.32  10.00  0.00  0.00  363.19  832,733.15 
5025+733.68  0.00  15.56  0.00  33.92  6.84  0.00  0.00  231.97  832,501.19 
5025+740.00  0.00  14.53  0.00  30.09  3.16  0.00  0.00  95.11  832,406.08 
5025+760.00  0.00  18.00  0.00  32.53  10.00  0.00  0.00  325.31  832,080.77 
5025+780.00  0.00  19.18  0.00  37.18  10.00  0.00  0.00  371.82  831,708.95 
5025+800.00  0.00  13.57  0.00  32.74  10.00  0.00  0.00  327.44  831,381.51 
5025+820.00  0.00  10.77  0.00  24.34  10.00  0.00  0.00  243.38  831,138.13 
5025+823.68  0.00  10.86  0.00  21.63  1.84  0.00  0.00  39.78  831,098.35 
5025+840.00  0.00  11.14  0.00  22.00  8.16  0.00  0.00  179.52  830,918.83 
5025+860.00  0.00  8.89  0.00  20.03  10.00  0.00  0.00  200.26  830,718.57 
5025+880.00  0.00  9.62  0.00  18.51  10.00  0.00  0.00  185.06  830,533.51 
5025+882.88  0.00  9.74  0.00  19.36  1.44  0.00  0.00  27.91  830,505.60 
5025+900.00  0.00  10.14  0.00  19.88  8.56  0.00  0.00  170.11  830,335.50 
5025+920.00  0.00  14.34  0.00  24.47  10.00  0.00  0.00  244.74  830,090.76 
5025+940.00  0.00  14.80  0.00  29.14  10.00  0.00  0.00  291.38  829,799.38 
5025+960.00  0.79  6.03  0.79  20.83  10.00  7.88  10.24  208.27  829,601.35 
5025+980.00  2.89  1.80  3.68  7.83  10.00  36.77  47.80  78.27  829,570.88 
5026+000.00  3.36  2.01  6.25  3.81  10.00  62.47  81.21  38.05  829,614.04 
5026+020.00  0.00  4.47  3.36  6.48  10.00  33.58  43.65  64.75  829,592.95 
5026+040.00  0.00  16.23  0.00  20.70  10.00  0.00  0.00  207.00  829,385.95 
5026+060.00  0.00  10.78  0.00  27.01  10.00  0.00  0.00  270.10  829,115.85 
5026+080.00  0.00  4.71  0.00  15.49  10.00  0.00  0.00  154.85  828,961.00 
5026+100.00  0.00  9.47  0.00  14.18  10.00  0.00  0.00  141.76  828,819.24 
5026+100.00  0.00  9.17  0.00  18.64  0.00  0.00  0.00  0.00  828,819.24 
5026+120.00  0.00  21.93  0.00  31.10  10.00  0.00  0.00  310.99  828,508.25 
5026+140.00  0.00  22.67  0.00  44.60  10.00  0.00  0.00  446.00  828,062.25 
5026+160.00  0.00  21.27  0.00  43.93  10.00  0.00  0.00  439.34  827,622.91 

223 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5026+180.00  0.00  12.80  0.00  34.07  10.00  0.00  0.00  340.72  827,282.19 
5026+200.00  1.09  3.60  1.09  16.40  10.00  10.93  14.21  164.03  827,132.37 
5026+220.00  1.53  2.22  2.62  5.82  10.00  26.21  34.07  58.20  827,108.24 
5026+240.00  0.00  3.25  1.53  5.47  10.00  15.28  19.86  54.67  827,073.43 
5026+260.00  0.00  17.12  0.00  20.37  10.00  0.00  0.00  203.70  826,869.73 
5026+280.00  0.00  27.58  0.00  44.70  10.00  0.00  0.00  447.02  826,422.71 
5026+300.00  0.00  29.46  0.00  57.04  10.00  0.00  0.00  570.42  825,852.29 
5026+320.00  0.00  28.58  0.00  58.04  10.00  0.00  0.00  580.40  825,271.89 
5026+340.00  0.00  17.64  0.00  46.22  10.00  0.00  0.00  462.19  824,809.70 
5026+360.00  0.00  24.13  0.00  41.77  10.00  0.00  0.00  417.72  824,391.98 
5026+380.00  0.00  13.21  0.00  37.34  10.00  0.00  0.00  373.36  824,018.62 
5026+400.00  0.00  9.09  0.00  22.30  10.00  0.00  0.00  223.01  823,795.61 
5026+420.00  0.00  7.15  0.00  16.24  10.00  0.00  0.00  162.42  823,633.19 
5026+440.00  0.44  3.13  0.44  10.28  10.00  4.43  5.76  102.79  823,536.16 
5026+460.00  1.84  2.44  2.28  5.57  10.00  22.82  29.67  55.73  823,510.10 
5026+480.00  3.61  2.61  5.45  5.05  10.00  54.47  70.81  50.54  823,530.37 
5026+500.00  0.00  8.45  3.61  11.06  10.00  36.08  46.90  110.63  823,466.64 
5026+520.00  0.00  13.59  0.00  22.04  10.00  0.00  0.00  220.41  823,246.23 
5026+540.00  0.00  22.19  0.00  35.78  10.00  0.00  0.00  357.82  822,888.41 
5026+560.00  0.00  30.14  0.00  52.33  10.00  0.00  0.00  523.28  822,365.13 
5026+580.00  0.00  35.91  0.00  66.05  10.00  0.00  0.00  660.49  821,704.64 
5026+600.00  0.00  36.76  0.00  72.67  10.00  0.00  0.00  726.73  820,977.91 
5026+620.00  0.00  36.49  0.00  73.25  10.00  0.00  0.00  732.54  820,245.37 
5026+623.09  0.00  35.56  0.00  72.06  1.54  0.00  0.00  111.18  820,134.19 
5026+640.00  0.00  30.87  0.00  66.43  8.46  0.00  0.00  561.79  819,572.40 
5026+660.00  0.00  29.96  0.00  60.83  10.00  0.00  0.00  608.30  818,964.10 
5026+680.00  0.00  29.10  0.00  59.07  10.00  0.00  0.00  590.67  818,373.43 
5026+683.09  0.00  28.71  0.00  57.81  1.54  0.00  0.00  89.20  818,284.23 
5026+700.00  0.00  26.46  0.00  55.16  8.46  0.00  0.00  466.49  817,817.74 
5026+720.00  0.00  31.10  0.00  57.55  10.00  0.00  0.00  575.50  817,242.24 
5026+740.00  0.00  10.70  0.00  41.79  10.00  0.00  0.00  417.90  816,824.34 
5026+760.00  0.00  36.19  0.00  46.89  10.00  0.00  0.00  468.86  816,355.48 
5026+771.35  0.00  35.84  0.00  72.03  5.68  0.00  0.00  408.83  815,946.65 
5026+780.00  0.00  35.42  0.00  71.27  4.32  0.00  0.00  308.19  815,638.46 
5026+800.00  0.00  19.00  0.00  54.42  10.00  0.00  0.00  544.23  815,094.23 
5026+820.00  0.00  13.60  0.00  32.60  10.00  0.00  0.00  326.04  814,768.19 
5026+831.35  0.00  16.19  0.00  29.80  5.68  0.00  0.00  169.11  814,599.08 
5026+840.00  0.00  18.37  0.00  34.56  4.32  0.00  0.00  149.47  814,449.61 
5026+860.00  0.00  34.02  0.00  52.39  10.00  0.00  0.00  523.88  813,925.73 
5026+880.00  0.00  42.48  0.00  76.50  10.00  0.00  0.00  764.99  813,160.74 
5026+900.00  0.00  48.85  0.00  91.33  10.00  0.00  0.00  913.33  812,247.41 
5026+920.00  0.00  51.02  0.00  99.87  10.00  0.00  0.00  998.71  811,248.70 
5026+940.00  0.00  43.99  0.00  95.01  10.00  0.00  0.00  950.05  810,298.65 
5026+960.00  0.00  37.03  0.00  81.02  10.00  0.00  0.00  810.19  809,488.46 
5026+980.00  0.00  30.25  0.00  67.28  10.00  0.00  0.00  672.83  808,815.63 

224 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5027+000.00  0.00  37.38  0.00  67.63  10.00  0.00  0.00  676.34  808,139.29 
5027+020.00  0.00  32.14  0.00  69.52  10.00  0.00  0.00  695.22  807,444.07 
5027+020.00  0.00  33.66  0.00  65.80  0.00  0.00  0.00  0.00  807,444.07 
5027+040.00  0.00  28.91  0.00  62.57  10.00  0.00  0.00  625.65  806,818.42 
5027+060.00  0.00  21.55  0.00  50.46  10.00  0.00  0.00  504.56  806,313.86 
5027+080.00  0.00  19.22  0.00  40.77  10.00  0.00  0.00  407.70  805,906.16 
5027+100.00  0.00  16.00  0.00  35.22  10.00  0.00  0.00  352.22  805,553.94 
5027+120.00  0.00  12.80  0.00  28.80  10.00  0.00  0.00  287.97  805,265.97 
5027+140.00  0.00  12.88  0.00  25.68  10.00  0.00  0.00  256.77  805,009.20 
5027+160.00  0.00  10.99  0.00  23.87  10.00  0.00  0.00  238.67  804,770.53 
5027+180.00  0.00  14.78  0.00  25.76  10.00  0.00  0.00  257.63  804,512.90 
5027+200.00  0.00  14.41  0.00  29.19  10.00  0.00  0.00  291.86  804,221.04 
5027+220.00  0.00  22.22  0.00  36.63  10.00  0.00  0.00  366.33  803,854.71 
5027+240.00  0.00  19.04  0.00  41.26  10.00  0.00  0.00  412.64  803,442.07 
5027+260.00  0.00  20.77  0.00  39.81  10.00  0.00  0.00  398.07  803,044.00 
5027+280.00  0.00  15.84  0.00  36.60  10.00  0.00  0.00  366.02  802,677.98 
5027+300.00  0.00  18.28  0.00  34.12  10.00  0.00  0.00  341.18  802,336.80 
5027+320.00  0.00  22.07  0.00  40.35  10.00  0.00  0.00  403.52  801,933.28 
5027+340.00  0.00  34.69  0.00  56.76  10.00  0.00  0.00  567.57  801,365.71 
5027+360.00  0.00  36.93  0.00  71.62  10.00  0.00  0.00  716.21  800,649.50 
5027+380.00  0.00  28.29  0.00  65.23  10.00  0.00  0.00  652.25  799,997.25 
5027+400.00  0.00  15.95  0.00  44.24  10.00  0.00  0.00  442.44  799,554.81 
5027+420.00  0.00  12.61  0.00  28.56  10.00  0.00  0.00  285.64  799,269.17 
5027+440.00  0.00  18.28  0.00  30.89  10.00  0.00  0.00  308.89  798,960.28 
5027+460.00  0.00  16.01  0.00  34.29  10.00  0.00  0.00  342.91  798,617.37 
5027+480.00  0.00  20.03  0.00  36.04  10.00  0.00  0.00  360.38  798,256.99 
5027+500.00  0.00  23.78  0.00  43.81  10.00  0.00  0.00  438.07  797,818.92 
5027+520.00  0.00  20.50  0.00  44.29  10.00  0.00  0.00  442.85  797,376.07 
5027+540.00  0.00  18.40  0.00  38.90  10.00  0.00  0.00  389.03  796,987.04 
5027+560.00  0.00  23.22  0.00  41.62  10.00  0.00  0.00  416.24  796,570.80 
5027+580.00  0.00  23.94  0.00  47.16  10.00  0.00  0.00  471.60  796,099.20 
5027+600.00  0.00  24.21  0.00  48.15  10.00  0.00  0.00  481.50  795,617.70 
5027+620.00  0.00  17.08  0.00  41.29  10.00  0.00  0.00  412.90  795,204.80 
5027+640.00  0.00  15.18  0.00  32.25  10.00  0.00  0.00  322.53  794,882.27 
5027+660.00  0.00  12.17  0.00  27.35  10.00  0.00  0.00  273.49  794,608.78 
5027+680.00  0.00  12.19  0.00  24.37  10.00  0.00  0.00  243.66  794,365.12 
5027+700.00  0.00  5.31  0.00  17.50  10.00  0.00  0.00  175.01  794,190.11 
5027+720.00  0.00  8.23  0.00  13.54  10.00  0.00  0.00  135.41  794,054.70 
5027+740.00  0.00  10.31  0.00  18.54  10.00  0.00  0.00  185.39  793,869.31 
5027+750.00  0.00  8.23  0.00  18.54  5.00  0.00  0.00  92.68  793,776.64 
5027+750.00  0.00  12.06  0.00  20.29  0.00  0.00  0.00  0.00  793,776.64 
5027+760.00  0.00  9.76  0.00  21.81  5.00  0.00  0.00  109.07  793,667.57 
5027+780.00  0.59  5.51  0.59  15.26  10.00  5.91  7.68  152.63  793,522.62 
5027+800.00  0.96  5.88  1.55  11.39  10.00  15.46  20.10  113.85  793,428.87 
5027+820.00  2.63  4.42  3.58  10.30  10.00  35.83  46.58  103.01  793,372.44 

225 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5027+840.00  2.95  3.98  5.58  8.40  10.00  55.77  72.50  84.01  793,360.93 
5027+860.00  0.37  7.83  3.32  11.80  10.00  33.16  43.11  118.02  793,286.02 
5027+880.00  0.30  10.91  0.66  18.73  10.00  6.64  8.63  187.32  793,107.33 
5027+900.00  0.20  9.89  0.50  20.80  10.00  4.98  6.47  207.99  792,905.81 
5027+920.00  3.89  3.79  4.09  13.68  10.00  40.92  53.20  136.81  792,822.20 
5027+940.00  1.05  6.53  4.94  10.32  10.00  49.36  64.17  103.16  792,783.21 
5027+960.00  0.00  11.72  1.05  18.24  10.00  10.45  13.59  182.43  792,614.36 
5027+980.00  0.00  14.20  0.00  25.92  10.00  0.00  0.00  259.17  792,355.19 
5028+000.00  0.00  15.53  0.00  29.73  10.00  0.00  0.00  297.31  792,057.88 
5028+020.00  0.00  10.75  0.00  26.28  10.00  0.00  0.00  262.79  791,795.09 
5028+040.00  0.00  13.54  0.00  24.29  10.00  0.00  0.00  242.89  791,552.20 
5028+060.00  0.00  19.53  0.00  33.07  10.00  0.00  0.00  330.65  791,221.55 
5028+080.00  0.00  20.83  0.00  40.36  10.00  0.00  0.00  403.57  790,817.98 
5028+100.00  0.00  20.51  0.00  41.34  10.00  0.00  0.00  413.39  790,404.59 
5028+120.00  0.00  18.28  0.00  38.79  10.00  0.00  0.00  387.91  790,016.68 
5028+140.00  0.00  17.02  0.00  35.31  10.00  0.00  0.00  353.08  789,663.60 
5028+160.00  0.00  19.59  0.00  36.61  10.00  0.00  0.00  366.12  789,297.48 
5028+180.00  0.00  24.42  0.00  44.01  10.00  0.00  0.00  440.08  788,857.40 
5028+200.00  0.00  27.09  0.00  51.51  10.00  0.00  0.00  515.14  788,342.26 
5028+220.00  0.00  25.66  0.00  52.75  10.00  0.00  0.00  527.53  787,814.73 
5028+240.00  0.00  16.99  0.00  42.65  10.00  0.00  0.00  426.48  787,388.25 
5028+260.00  0.00  11.23  0.00  28.22  10.00  0.00  0.00  282.18  787,106.07 
5028+280.00  0.00  16.98  0.00  28.21  10.00  0.00  0.00  282.09  786,823.98 
5028+300.00  0.00  13.75  0.00  30.73  10.00  0.00  0.00  307.30  786,516.68 
5028+320.00  0.00  13.04  0.00  26.79  10.00  0.00  0.00  267.86  786,248.82 
5028+340.00  0.00  11.79  0.00  24.83  10.00  0.00  0.00  248.25  786,000.57 
5028+360.00  0.00  13.88  0.00  25.67  10.00  0.00  0.00  256.67  785,743.90 
5028+380.00  0.00  9.67  0.00  23.54  10.00  0.00  0.00  235.44  785,508.46 
5028+400.00  0.00  10.33  0.00  19.99  10.00  0.00  0.00  199.91  785,308.55 
5028+420.00  0.00  15.76  0.00  26.08  10.00  0.00  0.00  260.84  785,047.71 
5028+440.00  0.00  21.35  0.00  37.11  10.00  0.00  0.00  371.07  784,676.64 
5028+460.00  0.00  23.55  0.00  44.89  10.00  0.00  0.00  448.93  784,227.71 
5028+480.00  0.00  25.87  0.00  49.41  10.00  0.00  0.00  494.10  783,733.61 
5028+490.00  0.00  28.46  0.00  54.33  5.00  0.00  0.00  271.63  783,461.98 
5028+490.00  0.00  25.82  0.00  54.28  0.00  0.00  0.00  0.00  783,461.98 
5028+500.00  0.00  28.47  0.00  54.29  5.00  0.00  0.00  271.44  783,190.55 
5028+520.00  0.00  28.56  0.00  57.02  10.00  0.00  0.00  570.23  782,620.32 
5028+540.00  0.00  31.84  0.00  60.40  10.00  0.00  0.00  603.96  782,016.36 
5028+560.00  0.00  22.36  0.00  54.20  10.00  0.00  0.00  541.97  781,474.39 
5028+580.00  0.00  15.34  0.00  37.70  10.00  0.00  0.00  376.99  781,097.40 
5028+600.00  0.00  17.12  0.00  32.46  10.00  0.00  0.00  324.64  780,772.76 
5028+620.00  0.00  15.77  0.00  32.89  10.00  0.00  0.00  328.93  780,443.83 
5028+640.00  0.00  15.23  0.00  31.00  10.00  0.00  0.00  309.96  780,133.87 
5028+660.00  0.00  17.02  0.00  32.24  10.00  0.00  0.00  322.41  779,811.46 
5028+680.00  0.00  24.15  0.00  41.17  10.00  0.00  0.00  411.67  779,399.79 

226 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5028+700.00  0.00  25.78  0.00  49.93  10.00  0.00  0.00  499.30  778,900.49 
5028+720.00  0.00  22.67  0.00  48.45  10.00  0.00  0.00  484.45  778,416.04 
5028+740.00  0.00  18.77  0.00  41.44  10.00  0.00  0.00  414.38  778,001.66 
5028+760.00  0.00  23.08  0.00  41.85  10.00  0.00  0.00  418.50  777,583.16 
5028+780.00  0.00  23.28  0.00  46.36  10.00  0.00  0.00  463.58  777,119.58 
5028+800.00  0.00  21.63  0.00  44.91  10.00  0.00  0.00  449.11  776,670.47 
5028+820.00  0.00  20.49  0.00  42.12  10.00  0.00  0.00  421.18  776,249.29 
5028+840.00  0.00  16.18  0.00  36.66  10.00  0.00  0.00  366.62  775,882.67 
5028+860.00  0.00  15.95  0.00  32.13  10.00  0.00  0.00  321.29  775,561.38 
5028+880.00  0.00  19.66  0.00  35.61  10.00  0.00  0.00  356.09  775,205.29 
5028+900.00  0.00  20.25  0.00  39.91  10.00  0.00  0.00  399.05  774,806.24 
5028+920.00  0.00  21.13  0.00  41.37  10.00  0.00  0.00  413.74  774,392.50 
5028+920.00  0.00  22.83  0.00  43.96  0.00  0.00  0.00  0.00  774,392.50 
5028+940.00  0.00  15.90  0.00  38.73  10.00  0.00  0.00  387.29  774,005.21 
5028+960.00  0.00  20.10  0.00  35.99  10.00  0.00  0.00  359.92  773,645.29 
5028+980.00  0.00  14.61  0.00  34.71  10.00  0.00  0.00  347.08  773,298.21 
5029+000.00  0.00  16.76  0.00  31.37  10.00  0.00  0.00  313.69  772,984.52 
5029+020.00  0.00  22.16  0.00  38.92  10.00  0.00  0.00  389.18  772,595.34 
5029+040.00  0.00  21.07  0.00  43.23  10.00  0.00  0.00  432.28  772,163.06 
5029+060.00  0.00  19.21  0.00  40.28  10.00  0.00  0.00  402.76  771,760.30 
5029+080.00  0.00  19.48  0.00  38.69  10.00  0.00  0.00  386.85  771,373.45 
5029+100.00  0.00  13.41  0.00  32.89  10.00  0.00  0.00  328.86  771,044.59 
5029+120.00  0.00  12.22  0.00  25.63  10.00  0.00  0.00  256.31  770,788.28 
5029+140.00  0.00  12.92  0.00  25.14  10.00  0.00  0.00  251.44  770,536.84 
5029+160.00  0.00  11.30  0.00  24.22  10.00  0.00  0.00  242.22  770,294.62 
5029+180.00  0.38  8.08  0.38  19.38  10.00  3.77  4.90  193.82  770,105.70 
5029+200.00  0.00  9.25  0.38  17.34  10.00  3.77  4.90  173.36  769,937.24 
5029+220.00  0.00  12.36  0.00  21.61  10.00  0.00  0.00  216.11  769,721.13 
5029+240.00  0.00  12.29  0.00  24.65  10.00  0.00  0.00  246.48  769,474.65 
5029+260.00  0.46  9.63  0.46  21.92  10.00  4.56  5.93  219.24  769,261.34 
5029+280.00  0.00  13.79  0.46  23.43  10.00  4.56  5.93  234.27  769,032.99 
5029+285.11  0.00  16.16  0.00  29.96  2.56  0.00  0.00  76.56  768,956.44 
5029+300.00  0.00  20.69  0.00  36.85  7.44  0.00  0.00  274.33  768,682.11 
5029+320.00  0.00  23.56  0.00  44.25  10.00  0.00  0.00  442.45  768,239.66 
5029+340.00  0.00  20.61  0.00  44.17  10.00  0.00  0.00  441.69  767,797.97 
5029+360.00  0.00  18.70  0.00  39.31  10.00  0.00  0.00  393.14  767,404.83 
5029+380.00  0.00  17.56  0.00  36.26  10.00  0.00  0.00  362.61  767,042.22 
5029+400.00  0.00  13.25  0.00  30.81  10.00  0.00  0.00  308.12  766,734.10 
5029+420.00  0.00  8.67  0.00  21.92  10.00  0.00  0.00  219.22  766,514.88 
5029+435.11  0.00  13.38  0.00  22.05  7.56  0.00  0.00  166.61  766,348.27 
5029+440.00  0.00  15.02  0.00  28.41  2.44  0.00  0.00  69.44  766,278.83 
5029+440.00  0.00  16.43  0.00  31.45  0.00  0.00  0.00  0.00  766,278.83 
5029+460.00  0.00  19.93  0.00  36.36  10.00  0.00  0.00  363.59  765,915.24 
5029+480.00  0.02  15.57  0.02  35.50  10.00  0.19  0.25  355.01  765,560.47 
5029+500.00  0.25  17.26  0.27  32.83  10.00  2.67  3.47  328.32  765,235.62 

227 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5029+520.00  0.39  14.43  0.64  31.69  10.00  6.40  8.32  316.85  764,927.09 
5029+540.00  0.50  7.25  0.89  21.67  10.00  8.90  11.57  216.72  764,721.94 
5029+560.00  0.49  6.67  0.99  13.91  10.00  9.92  12.90  139.14  764,595.70 
5029+580.00  0.54  9.67  1.04  16.34  10.00  10.35  13.46  163.35  764,445.80 
5029+600.00  0.64  8.65  1.18  18.32  10.00  11.76  15.29  183.19  764,277.90 
5029+620.00  0.66  6.82  1.29  15.47  10.00  12.93  16.81  154.74  764,139.97 
5029+640.00  0.49  11.63  1.15  18.46  10.00  11.50  14.95  184.55  763,970.37 
5029+660.00  0.44  10.39  0.93  22.03  10.00  9.34  12.14  220.25  763,762.26 
5029+680.00  0.23  14.29  0.67  24.68  10.00  6.70  8.71  246.80  763,524.17 
5029+700.00  0.00  14.36  0.23  28.65  10.00  2.28  2.96  286.45  763,240.69 
5029+720.00  0.29  8.21  0.29  22.57  10.00  2.88  3.74  225.69  763,018.74 
5029+740.00  1.63  5.43  1.92  13.64  10.00  19.16  24.91  136.40  762,907.25 
5029+740.00  1.63  5.43  3.26  10.86  0.00  0.00  0.00  0.00  762,907.25 
5029+740.36  1.64  5.41  3.27  10.84  0.18  0.59  0.77  1.96  762,906.06 
5029+760.00  2.77  4.79  4.41  10.21  9.82  43.32  56.32  100.21  762,862.16 
5029+780.00  0.00  11.01  2.77  15.80  10.00  27.70  36.01  158.01  762,740.16 
5029+800.00  0.00  22.19  0.00  33.19  10.00  0.00  0.00  331.93  762,408.23 
5029+820.00  0.00  25.16  0.00  47.35  10.00  0.00  0.00  473.46  761,934.77 
5029+840.00  0.00  25.26  0.00  50.42  10.00  0.00  0.00  504.17  761,430.60 
5029+860.00  0.00  27.56  0.00  52.82  10.00  0.00  0.00  528.18  760,902.42 
5029+880.00  0.00  31.52  0.00  59.08  10.00  0.00  0.00  590.84  760,311.58 
5029+890.36  0.00  32.26  0.00  63.79  5.18  0.00  0.00  330.50  759,981.08 
5029+900.00  0.00  32.93  0.00  65.20  4.82  0.00  0.00  314.15  759,666.93 
5029+920.00  0.00  35.56  0.00  68.49  10.00  0.00  0.00  684.94  758,981.99 
5029+940.00  0.00  33.95  0.00  69.51  10.00  0.00  0.00  695.06  758,286.93 
5029+960.00  0.00  31.26  0.00  65.20  10.00  0.00  0.00  652.04  757,634.89 
5029+980.00  0.00  28.18  0.00  59.44  10.00  0.00  0.00  594.36  757,040.53 
5030+000.00  0.00  30.45  0.00  58.62  10.00  0.00  0.00  586.23  756,454.30 
5030+020.00  0.00  31.98  0.00  62.43  10.00  0.00  0.00  624.30  755,830.00 
5030+040.00  0.00  29.90  0.00  61.88  10.00  0.00  0.00  618.84  755,211.16 
5030+060.00  0.00  27.53  0.00  57.43  10.00  0.00  0.00  574.32  754,636.84 
5030+065.00  0.00  26.51  0.00  54.04  2.50  0.00  0.00  135.09  754,501.75 
5030+065.00  0.00  20.95  0.00  47.45  0.00  0.00  0.00  0.00  754,501.75 
5030+080.00  0.00  18.11  0.00  39.06  7.50  0.00  0.00  292.95  754,208.80 
5030+100.00  0.00  16.15  0.00  34.26  10.00  0.00  0.00  342.64  753,866.16 
5030+120.00  0.00  17.42  0.00  33.57  10.00  0.00  0.00  335.67  753,530.49 
5030+140.00  0.00  17.79  0.00  35.20  10.00  0.00  0.00  352.04  753,178.45 
5030+160.00  0.00  18.31  0.00  36.10  10.00  0.00  0.00  360.98  752,817.47 
5030+180.00  0.00  17.40  0.00  35.71  10.00  0.00  0.00  357.11  752,460.36 
5030+200.00  0.00  16.07  0.00  33.48  10.00  0.00  0.00  334.76  752,125.60 
5030+220.00  0.00  12.12  0.00  28.20  10.00  0.00  0.00  281.96  751,843.64 
5030+240.00  0.00  10.21  0.00  22.34  10.00  0.00  0.00  223.36  751,620.28 
5030+260.00  0.00  9.57  0.00  19.78  10.00  0.00  0.00  197.80  751,422.48 
5030+280.00  0.00  13.75  0.00  23.32  10.00  0.00  0.00  233.18  751,189.30 
5030+300.00  0.00  13.12  0.00  26.87  10.00  0.00  0.00  268.74  750,920.56 

228 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5030+320.00  0.00  15.39  0.00  28.51  10.00  0.00  0.00  285.08  750,635.48 
5030+340.00  0.00  13.58  0.00  28.97  10.00  0.00  0.00  289.66  750,345.82 
5030+360.00  0.00  11.43  0.00  25.01  10.00  0.00  0.00  250.12  750,095.70 
5030+380.00  0.00  12.04  0.00  23.48  10.00  0.00  0.00  234.75  749,860.95 
5030+400.00  0.00  10.18  0.00  22.23  10.00  0.00  0.00  222.26  749,638.69 
5030+420.00  0.00  10.64  0.00  20.82  10.00  0.00  0.00  208.22  749,430.47 
5030+440.00  0.00  13.01  0.00  23.65  10.00  0.00  0.00  236.51  749,193.96 
5030+460.00  0.00  13.41  0.00  26.42  10.00  0.00  0.00  264.22  748,929.74 
5030+480.00  0.00  15.04  0.00  28.45  10.00  0.00  0.00  284.46  748,645.28 
5030+500.00  0.00  18.30  0.00  33.33  10.00  0.00  0.00  333.31  748,311.97 
5030+520.00  0.00  18.50  0.00  36.80  10.00  0.00  0.00  367.96  747,944.01 
5030+540.00  0.00  19.21  0.00  37.71  10.00  0.00  0.00  377.10  747,566.91 
5030+560.00  0.00  21.76  0.00  40.97  10.00  0.00  0.00  409.68  747,157.23 
5030+580.00  0.00  22.92  0.00  44.68  10.00  0.00  0.00  446.76  746,710.47 
5030+600.00  0.00  25.88  0.00  48.80  10.00  0.00  0.00  487.99  746,222.48 
5030+620.00  0.00  21.60  0.00  47.49  10.00  0.00  0.00  474.85  745,747.63 
5030+640.00  0.00  18.56  0.00  40.16  10.00  0.00  0.00  401.61  745,346.02 
5030+660.00  0.00  22.08  0.00  40.64  10.00  0.00  0.00  406.35  744,939.67 
5030+680.00  0.00  20.03  0.00  42.11  10.00  0.00  0.00  421.10  744,518.57 
5030+700.00  0.00  19.73  0.00  39.76  10.00  0.00  0.00  397.61  744,120.96 
5030+713.58  0.00  20.99  0.00  40.71  6.79  0.00  0.00  276.44  743,844.52 
5030+720.00  0.00  21.60  0.00  42.59  3.21  0.00  0.00  136.71  743,707.81 
5030+740.00  0.00  19.78  0.00  41.38  10.00  0.00  0.00  413.83  743,293.98 
5030+743.58  0.00  18.87  0.00  38.65  1.79  0.00  0.00  69.18  743,224.80 
5030+760.00  0.00  15.09  0.00  33.95  8.21  0.00  0.00  278.75  742,946.05 
5030+780.00  0.00  12.23  0.00  27.32  10.00  0.00  0.00  273.17  742,672.88 
5030+800.00  0.00  13.15  0.00  25.38  10.00  0.00  0.00  253.84  742,419.04 
5030+820.00  0.00  15.76  0.00  28.91  10.00  0.00  0.00  289.07  742,129.97 
5030+831.05  0.00  17.03  0.00  32.78  5.52  0.00  0.00  181.11  741,948.86 
5030+840.00  0.00  18.12  0.00  35.15  4.48  0.00  0.00  157.30  741,791.55 
5030+860.00  0.00  19.47  0.00  37.59  10.00  0.00  0.00  375.90  741,415.65 
5030+861.05  0.00  19.55  0.00  39.02  0.52  0.00  0.00  20.47  741,395.19 
5030+880.00  0.00  21.57  0.00  41.12  9.48  0.00  0.00  389.59  741,005.59 
5030+900.00  0.00  18.40  0.00  39.97  10.00  0.00  0.00  399.68  740,605.91 
5030+920.00  0.00  18.85  0.00  37.25  10.00  0.00  0.00  372.54  740,233.37 
5030+940.00  0.00  16.54  0.00  35.39  10.00  0.00  0.00  353.90  739,879.47 
5030+940.00  0.00  17.13  0.00  33.67  0.00  0.00  0.00  0.00  739,879.47 
5030+960.00  0.00  14.62  0.00  31.75  10.00  0.00  0.00  317.51  739,561.96 
5030+980.00  0.00  18.04  0.00  32.66  10.00  0.00  0.00  326.55  739,235.41 
5031+000.00  0.00  20.96  0.00  39.00  10.00  0.00  0.00  389.96  738,845.45 
5031+020.00  0.00  20.82  0.00  41.78  10.00  0.00  0.00  417.77  738,427.68 
5031+040.00  0.00  19.99  0.00  40.80  10.00  0.00  0.00  408.01  738,019.67 
5031+060.00  0.00  20.09  0.00  40.07  10.00  0.00  0.00  400.72  737,618.95 
5031+080.00  0.00  23.37  0.00  43.45  10.00  0.00  0.00  434.52  737,184.43 
5031+100.00  0.00  21.58  0.00  44.95  10.00  0.00  0.00  449.45  736,734.98 

229 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5031+120.00  0.00  22.24  0.00  43.82  10.00  0.00  0.00  438.20  736,296.78 
5031+140.00  0.00  26.47  0.00  48.71  10.00  0.00  0.00  487.11  735,809.67 
5031+160.00  0.00  24.73  0.00  51.20  10.00  0.00  0.00  512.04  735,297.63 
5031+180.00  0.00  24.94  0.00  49.68  10.00  0.00  0.00  496.76  734,800.87 
5031+200.00  0.00  27.66  0.00  52.61  10.00  0.00  0.00  526.06  734,274.81 
5031+220.00  0.00  27.04  0.00  54.70  10.00  0.00  0.00  547.02  733,727.79 
5031+240.00  0.00  26.92  0.00  53.96  10.00  0.00  0.00  539.59  733,188.20 
5031+260.00  0.00  24.57  0.00  51.49  10.00  0.00  0.00  514.93  732,673.27 
5031+280.00  0.00  23.74  0.00  48.31  10.00  0.00  0.00  483.10  732,190.17 
5031+300.00  0.00  26.95  0.00  50.69  10.00  0.00  0.00  506.90  731,683.27 
5031+320.00  0.00  27.92  0.00  54.87  10.00  0.00  0.00  548.68  731,134.59 
5031+340.00  0.00  27.85  0.00  55.76  10.00  0.00  0.00  557.64  730,576.95 
5031+360.00  0.00  27.29  0.00  55.14  10.00  0.00  0.00  551.39  730,025.56 
5031+380.00  0.00  26.94  0.00  54.23  10.00  0.00  0.00  542.31  729,483.25 
5031+400.00  0.00  23.86  0.00  50.80  10.00  0.00  0.00  508.00  728,975.25 
5031+420.00  0.00  21.49  0.00  45.35  10.00  0.00  0.00  453.51  728,521.74 
5031+440.00  0.00  20.84  0.00  42.33  10.00  0.00  0.00  423.33  728,098.41 
5031+460.00  0.00  18.62  0.00  39.46  10.00  0.00  0.00  394.58  727,703.83 
5031+480.00  0.00  16.24  0.00  34.85  10.00  0.00  0.00  348.52  727,355.31 
5031+500.00  0.00  13.28  0.00  29.52  10.00  0.00  0.00  295.17  727,060.14 
5031+520.00  0.00  10.75  0.00  24.03  10.00  0.00  0.00  240.32  726,819.82 
5031+540.00  0.00  13.66  0.00  24.41  10.00  0.00  0.00  244.06  726,575.76 
5031+560.00  0.00  17.74  0.00  31.40  10.00  0.00  0.00  313.95  726,261.81 
5031+580.00  0.00  20.01  0.00  37.75  10.00  0.00  0.00  377.46  725,884.35 
5031+600.00  0.00  20.29  0.00  40.29  10.00  0.00  0.00  402.92  725,481.43 
5031+620.00  0.00  20.45  0.00  40.73  10.00  0.00  0.00  407.31  725,074.12 
5031+640.00  0.00  21.90  0.00  42.35  10.00  0.00  0.00  423.46  724,650.66 
5031+660.00  0.00  20.22  0.00  42.12  10.00  0.00  0.00  421.20  724,229.46 
5031+680.00  0.00  20.11  0.00  40.33  10.00  0.00  0.00  403.31  723,826.15 
5031+700.00  0.00  19.40  0.00  39.51  10.00  0.00  0.00  395.09  723,431.06 
5031+720.00  0.00  21.45  0.00  40.85  10.00  0.00  0.00  408.45  723,022.61 
5031+740.00  0.00  24.53  0.00  45.98  10.00  0.00  0.00  459.75  722,562.86 
5031+760.00  0.00  26.04  0.00  50.57  10.00  0.00  0.00  505.65  722,057.21 
5031+780.00  0.00  24.16  0.00  50.20  10.00  0.00  0.00  501.97  721,555.24 
5031+800.00  0.00  20.00  0.00  44.16  10.00  0.00  0.00  441.61  721,113.63 
5031+820.00  0.00  19.70  0.00  39.70  10.00  0.00  0.00  396.98  720,716.65 
5031+840.00  0.00  19.58  0.00  39.28  10.00  0.00  0.00  392.78  720,323.87 
5031+860.00  0.00  24.78  0.00  44.36  10.00  0.00  0.00  443.56  719,880.31 
5031+880.00  0.00  29.98  0.00  54.76  10.00  0.00  0.00  547.55  719,332.76 
5031+900.00  0.00  28.58  0.00  58.56  10.00  0.00  0.00  585.62  718,747.14 
5031+920.00  0.00  27.81  0.00  56.40  10.00  0.00  0.00  563.96  718,183.18 
5031+940.00  0.00  28.16  0.00  55.97  10.00  0.00  0.00  559.72  717,623.46 
5031+960.00  0.00  23.35  0.00  51.51  10.00  0.00  0.00  515.06  717,108.40 
5031+980.00  0.00  17.12  0.00  40.47  10.00  0.00  0.00  404.68  716,703.72 
5032+000.00  0.00  17.40  0.00  34.52  10.00  0.00  0.00  345.24  716,358.48 

230 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5032+020.00  0.00  20.80  0.00  38.21  10.00  0.00  0.00  382.06  715,976.42 
5032+040.00  0.00  21.23  0.00  42.03  10.00  0.00  0.00  420.33  715,556.09 
5032+060.00  0.00  18.73  0.00  39.96  10.00  0.00  0.00  399.60  715,156.49 
5032+080.00  0.00  19.92  0.00  38.65  10.00  0.00  0.00  386.50  714,769.99 
5032+100.00  0.00  19.04  0.00  38.97  10.00  0.00  0.00  389.65  714,380.34 
5032+120.00  0.00  17.83  0.00  36.88  10.00  0.00  0.00  368.76  714,011.58 
5032+140.00  0.00  20.41  0.00  38.24  10.00  0.00  0.00  382.39  713,629.19 
5032+160.00  0.00  21.85  0.00  42.25  10.00  0.00  0.00  422.52  713,206.67 
5032+180.00  0.00  21.56  0.00  43.41  10.00  0.00  0.00  434.09  712,772.58 
5032+200.00  0.00  18.41  0.00  39.98  10.00  0.00  0.00  399.77  712,372.81 
5032+220.00  0.00  11.71  0.00  30.12  10.00  0.00  0.00  301.21  712,071.60 
5032+240.00  0.30  9.86  0.30  21.57  10.00  3.00  3.90  215.65  711,859.85 
5032+260.00  0.00  10.95  0.30  20.81  10.00  3.00  3.90  208.11  711,655.64 
5032+280.00  0.00  12.58  0.00  23.53  10.00  0.00  0.00  235.31  711,420.33 
5032+300.00  0.00  17.29  0.00  29.87  10.00  0.00  0.00  298.67  711,121.66 
5032+320.00  0.00  25.35  0.00  42.64  10.00  0.00  0.00  426.42  710,695.24 
5032+340.00  0.00  25.02  0.00  50.38  10.00  0.00  0.00  503.76  710,191.48 
5032+360.00  0.00  22.51  0.00  47.53  10.00  0.00  0.00  475.29  709,716.19 
5032+380.00  0.00  24.84  0.00  47.34  10.00  0.00  0.00  473.41  709,242.78 
5032+400.00  0.00  25.01  0.00  49.85  10.00  0.00  0.00  498.50  708,744.28 
5032+420.00  0.00  24.92  0.00  49.94  10.00  0.00  0.00  499.36  708,244.92 
5032+440.00  0.00  22.79  0.00  47.71  10.00  0.00  0.00  477.12  707,767.80 
5032+460.00  0.00  24.94  0.00  47.73  10.00  0.00  0.00  477.30  707,290.50 
5032+480.00  0.00  27.77  0.00  52.71  10.00  0.00  0.00  527.08  706,763.42 
5032+500.00  0.00  26.13  0.00  53.90  10.00  0.00  0.00  538.96  706,224.46 
5032+520.00  0.00  24.31  0.00  50.43  10.00  0.00  0.00  504.33  705,720.13 
5032+540.00  0.00  24.57  0.00  48.87  10.00  0.00  0.00  488.70  705,231.43 
5032+560.00  0.00  27.32  0.00  51.88  10.00  0.00  0.00  518.80  704,712.63 
5032+580.00  0.00  31.56  0.00  58.88  10.00  0.00  0.00  588.78  704,123.85 
5032+600.00  0.00  30.75  0.00  62.32  10.00  0.00  0.00  623.16  703,500.69 
5032+620.00  0.00  26.92  0.00  57.68  10.00  0.00  0.00  576.77  702,923.92 
5032+640.00  0.00  27.57  0.00  54.50  10.00  0.00  0.00  544.96  702,378.96 
5032+660.00  0.00  32.02  0.00  59.59  10.00  0.00  0.00  595.87  701,783.09 
5032+680.00  0.00  32.79  0.00  64.80  10.00  0.00  0.00  648.00  701,135.09 
5032+700.00  0.00  29.88  0.00  62.66  10.00  0.00  0.00  626.63  700,508.46 
5032+720.00  0.00  24.07  0.00  53.94  10.00  0.00  0.00  539.43  699,969.03 
5032+740.00  0.00  21.15  0.00  45.21  10.00  0.00  0.00  452.14  699,516.89 
5032+760.00  0.00  23.19  0.00  44.33  10.00  0.00  0.00  443.34  699,073.55 
5032+780.00  0.00  25.23  0.00  48.42  10.00  0.00  0.00  484.17  698,589.38 
5032+800.00  0.00  25.97  0.00  51.20  10.00  0.00  0.00  511.97  698,077.41 
5032+820.00  0.00  28.29  0.00  54.25  10.00  0.00  0.00  542.53  697,534.88 
5032+840.00  0.00  25.89  0.00  54.18  10.00  0.00  0.00  541.82  696,993.06 
5032+860.00  0.00  22.77  0.00  48.66  10.00  0.00  0.00  486.60  696,506.46 
5032+880.00  0.00  26.85  0.00  49.62  10.00  0.00  0.00  496.18  696,010.28 
5032+900.00  0.00  29.56  0.00  56.41  10.00  0.00  0.00  564.12  695,446.16 

231 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5032+920.00  0.00  26.36  0.00  55.92  10.00  0.00  0.00  559.20  694,886.96 
5032+940.00  0.00  26.80  0.00  53.16  10.00  0.00  0.00  531.62  694,355.34 
5032+960.00  0.00  26.24  0.00  53.04  10.00  0.00  0.00  530.41  693,824.93 
5032+980.00  0.00  26.78  0.00  53.02  10.00  0.00  0.00  530.23  693,294.70 
5033+000.00  0.00  31.52  0.00  58.30  10.00  0.00  0.00  583.00  692,711.70 
5033+020.00  0.00  34.78  0.00  66.30  10.00  0.00  0.00  662.98  692,048.72 
5033+040.00  0.00  30.66  0.00  65.44  10.00  0.00  0.00  654.44  691,394.28 
5033+060.00  0.00  25.64  0.00  56.30  10.00  0.00  0.00  562.98  690,831.30 
5033+080.00  0.00  20.94  0.00  46.58  10.00  0.00  0.00  465.78  690,365.52 
5033+100.00  0.00  25.19  0.00  46.13  10.00  0.00  0.00  461.29  689,904.23 
5033+120.00  0.00  32.53  0.00  57.72  10.00  0.00  0.00  577.20  689,327.03 
5033+140.00  0.00  33.10  0.00  65.63  10.00  0.00  0.00  656.28  688,670.75 
5033+160.00  0.00  32.95  0.00  66.05  10.00  0.00  0.00  660.45  688,010.30 
5033+180.00  0.00  31.18  0.00  64.13  10.00  0.00  0.00  641.31  687,368.99 
5033+200.00  0.00  27.42  0.00  58.61  10.00  0.00  0.00  586.05  686,782.94 
5033+220.00  0.00  28.39  0.00  55.81  10.00  0.00  0.00  558.10  686,224.84 
5033+240.00  0.00  31.91  0.00  60.30  10.00  0.00  0.00  603.00  685,621.84 
5033+260.00  0.00  31.17  0.00  63.09  10.00  0.00  0.00  630.86  684,990.98 
5033+280.00  0.00  27.28  0.00  58.45  10.00  0.00  0.00  584.47  684,406.51 
5033+300.00  0.00  28.67  0.00  55.94  10.00  0.00  0.00  559.43  683,847.08 
5033+320.00  0.00  32.73  0.00  61.40  10.00  0.00  0.00  613.97  683,233.11 
5033+340.00  0.00  35.75  0.00  68.48  10.00  0.00  0.00  684.80  682,548.31 
5033+360.00  0.00  31.69  0.00  67.44  10.00  0.00  0.00  674.42  681,873.89 
5033+380.00  0.00  26.29  0.00  57.98  10.00  0.00  0.00  579.81  681,294.08 
5033+400.00  0.00  25.74  0.00  52.03  10.00  0.00  0.00  520.26  680,773.82 
5033+420.00  0.00  24.61  0.00  50.35  10.00  0.00  0.00  503.50  680,270.32 
5033+440.00  0.00  19.44  0.00  44.06  10.00  0.00  0.00  440.55  679,829.77 
5033+460.00  0.00  20.85  0.00  40.29  10.00  0.00  0.00  402.88  679,426.89 
5033+480.00  0.00  25.50  0.00  46.35  10.00  0.00  0.00  463.46  678,963.43 
5033+500.00  0.00  28.99  0.00  54.49  10.00  0.00  0.00  544.89  678,418.54 
5033+520.00  0.00  28.25  0.00  57.24  10.00  0.00  0.00  572.35  677,846.19 
5033+540.00  0.00  26.01  0.00  54.25  10.00  0.00  0.00  542.52  677,303.67 
5033+560.00  0.00  25.06  0.00  51.07  10.00  0.00  0.00  510.66  676,793.01 
5033+580.00  0.00  23.03  0.00  48.09  10.00  0.00  0.00  480.93  676,312.08 
5033+600.00  0.00  21.04  0.00  44.07  10.00  0.00  0.00  440.73  675,871.35 
5033+620.00  0.00  21.35  0.00  42.39  10.00  0.00  0.00  423.92  675,447.43 
5033+640.00  0.00  20.36  0.00  41.71  10.00  0.00  0.00  417.09  675,030.34 
5033+660.00  0.00  23.67  0.00  44.03  10.00  0.00  0.00  440.25  674,590.09 
5033+680.00  0.00  20.73  0.00  44.40  10.00  0.00  0.00  443.97  674,146.12 
5033+700.00  0.00  18.01  0.00  38.74  10.00  0.00  0.00  387.38  673,758.74 
5033+720.00  0.00  18.72  0.00  36.73  10.00  0.00  0.00  367.27  673,391.47 
5033+740.00  0.00  22.93  0.00  41.64  10.00  0.00  0.00  416.42  672,975.05 
5033+750.00  0.00  25.81  0.00  48.74  5.00  0.00  0.00  243.68  672,731.37 
5033+760.00  0.00  28.68  0.00  54.49  5.00  0.00  0.00  272.44  672,458.93 
5033+763.47  0.00  28.22  0.00  56.90  1.74  0.00  0.00  98.80  672,360.13 

232 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5033+780.00  0.00  26.26  0.00  54.48  8.26  0.00  0.00  450.19  671,909.94 
5033+793.47  0.00  25.94  0.00  52.20  6.74  0.00  0.00  351.66  671,558.29 
5033+800.00  0.00  25.85  0.00  51.79  3.26  0.00  0.00  169.02  671,389.26 
5033+820.00  0.00  24.01  0.00  49.86  10.00  0.00  0.00  498.58  670,890.68 
5033+840.00  0.00  26.89  0.00  50.90  10.00  0.00  0.00  509.02  670,381.66 
5033+860.00  0.00  28.85  0.00  55.74  10.00  0.00  0.00  557.40  669,824.26 
5033+877.83  0.00  28.92  0.00  57.77  8.92  0.00  0.00  515.05  669,309.21 
5033+880.00  0.00  28.93  0.00  57.85  1.08  0.00  0.00  62.74  669,246.48 
5033+900.00  0.00  28.07  0.00  56.99  10.00  0.00  0.00  569.93  668,676.55 
5033+907.83  0.00  26.10  0.00  54.16  3.92  0.00  0.00  212.08  668,464.47 
5033+920.00  0.00  23.30  0.00  49.40  6.08  0.00  0.00  300.57  668,163.89 
5033+940.00  0.00  21.81  0.00  45.12  10.00  0.00  0.00  451.17  667,712.72 
5033+960.00  0.00  26.01  0.00  47.83  10.00  0.00  0.00  478.25  667,234.47 
5033+980.00  0.00  30.55  0.00  56.56  10.00  0.00  0.00  565.63  666,668.84 
5034+000.00  0.00  27.72  0.00  58.27  10.00  0.00  0.00  582.73  666,086.11 
5034+020.00  0.00  27.15  0.00  54.87  10.00  0.00  0.00  548.68  665,537.43 
5034+040.00  0.00  30.51  0.00  57.65  10.00  0.00  0.00  576.53  664,960.90 
5034+060.00  0.00  23.87  0.00  54.38  10.00  0.00  0.00  543.76  664,417.14 
5034+080.00  0.00  19.66  0.00  43.53  10.00  0.00  0.00  435.26  663,981.88 
5034+100.00  0.00  16.77  0.00  36.43  10.00  0.00  0.00  364.26  663,617.62 
5034+120.00  0.00  16.19  0.00  32.96  10.00  0.00  0.00  329.60  663,288.02 
5034+140.00  0.00  20.09  0.00  36.28  10.00  0.00  0.00  362.80  662,925.22 
5034+160.00  0.00  26.91  0.00  47.00  10.00  0.00  0.00  469.97  662,455.25 
5034+180.00  0.00  28.21  0.00  55.11  10.00  0.00  0.00  551.12  661,904.13 
5034+200.00  0.00  17.54  0.00  45.75  10.00  0.00  0.00  457.48  661,446.65 
5034+200.00  0.00  17.69  0.00  35.24  0.00  0.00  0.00  0.00  661,446.65 
5034+220.00  0.00  10.85  0.00  28.54  10.00  0.00  0.00  285.40  661,161.25 
5034+240.00  0.00  13.77  0.00  24.62  10.00  0.00  0.00  246.15  660,915.10 
5034+260.00  0.00  20.48  0.00  34.25  10.00  0.00  0.00  342.48  660,572.62 
5034+280.00  0.00  23.44  0.00  43.92  10.00  0.00  0.00  439.15  660,133.47 
5034+290.00  0.00  25.95  0.00  49.38  5.00  0.00  0.00  246.91  659,886.56 
5034+290.00  0.00  28.62  0.00  54.57  0.00  0.00  0.00  0.00  659,886.56 
5034+300.00  0.00  30.65  0.00  59.27  5.00  0.00  0.00  296.34  659,590.22 
5034+320.00  0.00  31.85  0.00  62.50  10.00  0.00  0.00  624.97  658,965.25 
5034+340.00  0.00  34.91  0.00  66.76  10.00  0.00  0.00  667.62  658,297.63 
5034+360.00  0.00  35.57  0.00  70.49  10.00  0.00  0.00  704.86  657,592.77 
5034+380.00  0.00  26.98  0.00  62.55  10.00  0.00  0.00  625.50  656,967.27 
5034+400.00  0.00  25.01  0.00  51.99  10.00  0.00  0.00  519.89  656,447.38 
5034+420.00  0.00  20.26  0.00  45.27  10.00  0.00  0.00  452.68  655,994.70 
5034+440.00  0.00  12.32  0.00  32.58  10.00  0.00  0.00  325.75  655,668.95 
5034+450.00  0.00  11.10  0.00  23.42  5.00  0.00  0.00  117.08  655,551.87 
5034+460.00  0.00  9.90  0.00  21.00  5.00  0.00  0.00  104.99  655,446.88 
5034+480.00  0.00  12.58  0.00  22.48  10.00  0.00  0.00  224.76  655,222.12 
5034+500.00  0.00  17.05  0.00  29.62  10.00  0.00  0.00  296.24  654,925.88 
5034+520.00  0.00  19.60  0.00  36.65  10.00  0.00  0.00  366.52  654,559.36 

233 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5034+540.00  0.00  18.62  0.00  38.22  10.00  0.00  0.00  382.21  654,177.15 
5034+560.00  0.00  14.22  0.00  32.84  10.00  0.00  0.00  328.37  653,848.78 
5034+580.00  0.00  11.86  0.00  26.08  10.00  0.00  0.00  260.75  653,588.03 
5034+600.00  0.00  11.94  0.00  23.79  10.00  0.00  0.00  237.90  653,350.13 
5034+620.00  0.00  14.52  0.00  26.45  10.00  0.00  0.00  264.51  653,085.62 
5034+640.00  0.00  17.53  0.00  32.04  10.00  0.00  0.00  320.41  652,765.21 
5034+660.00  0.00  22.77  0.00  40.30  10.00  0.00  0.00  402.98  652,362.23 
5034+680.00  0.00  25.48  0.00  48.25  10.00  0.00  0.00  482.52  651,879.71 
5034+700.00  0.00  28.21  0.00  53.69  10.00  0.00  0.00  536.89  651,342.82 
5034+720.00  0.00  31.00  0.00  59.21  10.00  0.00  0.00  592.08  650,750.74 
5034+740.00  0.00  27.14  0.00  58.14  10.00  0.00  0.00  581.39  650,169.35 
5034+760.00  0.00  19.43  0.00  46.57  10.00  0.00  0.00  465.68  649,703.67 
5034+780.00  0.00  19.14  0.00  38.56  10.00  0.00  0.00  385.63  649,318.04 
5034+800.00  0.00  20.56  0.00  39.70  10.00  0.00  0.00  396.96  648,921.08 
5034+820.00  0.00  27.12  0.00  47.68  10.00  0.00  0.00  476.75  648,444.33 
5034+840.00  0.00  30.05  0.00  57.17  10.00  0.00  0.00  571.69  647,872.64 
5034+860.00  0.00  28.74  0.00  58.79  10.00  0.00  0.00  587.91  647,284.73 
5034+880.00  0.00  24.12  0.00  52.86  10.00  0.00  0.00  528.61  646,756.12 
5034+900.00  0.00  18.03  0.00  42.16  10.00  0.00  0.00  421.57  646,334.55 
5034+920.00  0.00  17.48  0.00  35.52  10.00  0.00  0.00  355.17  645,979.38 
5034+940.00  0.00  18.46  0.00  35.95  10.00  0.00  0.00  359.47  645,619.91 
5034+960.00  0.00  15.37  0.00  33.83  10.00  0.00  0.00  338.32  645,281.59 
5034+980.00  0.00  11.45  0.00  26.82  10.00  0.00  0.00  268.20  645,013.39 
5035+000.00  0.00  10.85  0.00  22.30  10.00  0.00  0.00  223.03  644,790.36 
5035+020.00  0.00  10.51  0.00  21.36  10.00  0.00  0.00  213.64  644,576.72 
5035+028.75  1.15  7.39  1.15  17.90  4.38  5.01  6.52  78.34  644,504.89 
5035+040.00  6.68  5.78  7.82  13.17  5.62  43.99  57.19  74.04  644,488.04 
5035+058.75  0.00  13.40  6.68  19.18  9.38  62.62  81.41  179.82  644,389.62 
5035+060.00  0.00  14.43  0.00  27.83  0.62  0.00  0.00  17.34  644,372.28 
5035+080.00  0.00  19.45  0.00  33.89  10.00  0.00  0.00  338.88  644,033.40 
5035+100.00  0.00  18.25  0.00  37.70  10.00  0.00  0.00  377.00  643,656.40 
5035+100.00  0.00  17.48  0.00  35.72  0.00  0.00  0.00  0.00  643,656.40 
5035+120.00  0.00  12.90  0.00  30.38  10.00  0.00  0.00  303.76  643,352.64 
5035+140.00  0.00  8.67  0.00  21.57  10.00  0.00  0.00  215.72  643,136.92 
5035+143.04  0.00  8.32  0.00  16.99  1.52  0.00  0.00  25.86  643,111.07 
5035+160.00  0.00  6.73  0.00  15.05  8.48  0.00  0.00  127.63  642,983.44 
5035+173.04  0.00  8.31  0.00  15.04  6.52  0.00  0.00  98.08  642,885.36 
5035+180.00  0.00  9.28  0.00  17.59  3.48  0.00  0.00  61.18  642,824.18 
5035+200.00  0.00  12.82  0.00  22.10  10.00  0.00  0.00  220.96  642,603.22 
5035+220.00  0.00  10.85  0.00  23.67  10.00  0.00  0.00  236.67  642,366.55 
5035+240.00  0.00  8.38  0.00  19.23  10.00  0.00  0.00  192.30  642,174.25 
5035+260.00  6.46  4.25  6.46  12.63  10.00  64.57  83.94  126.26  642,131.94 
5035+280.00  14.08  4.03  20.54  8.28  10.00  205.38  266.99  82.82  642,316.11 
5035+300.00  5.05  5.04  19.13  9.08  10.00  191.28  248.66  90.78  642,473.99 
5035+320.00  0.00  11.56  5.05  16.61  10.00  50.47  65.61  166.08  642,373.52 

234 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5035+340.00  0.00  16.88  0.00  28.45  10.00  0.00  0.00  284.48  642,089.04 
5035+360.00  0.00  24.07  0.00  40.95  10.00  0.00  0.00  409.53  641,679.51 
5035+380.00  0.00  25.51  0.00  49.57  10.00  0.00  0.00  495.74  641,183.77 
5035+400.00  0.00  27.20  0.00  52.71  10.00  0.00  0.00  527.09  640,656.68 
5035+420.00  0.00  25.90  0.00  53.10  10.00  0.00  0.00  531.03  640,125.65 
5035+440.00  0.00  24.07  0.00  49.97  10.00  0.00  0.00  499.67  639,625.98 
5035+460.00  0.00  21.01  0.00  45.08  10.00  0.00  0.00  450.75  639,175.23 
5035+480.00  0.00  23.16  0.00  44.16  10.00  0.00  0.00  441.63  638,733.60 
5035+500.00  0.00  26.17  0.00  49.32  10.00  0.00  0.00  493.24  638,240.36 
5035+520.00  0.00  20.45  0.00  46.62  10.00  0.00  0.00  466.18  637,774.18 
5035+540.00  0.00  15.26  0.00  35.71  10.00  0.00  0.00  357.13  637,417.05 
5035+560.00  0.00  12.94  0.00  28.20  10.00  0.00  0.00  281.99  637,135.06 
5035+580.00  0.00  13.27  0.00  26.21  10.00  0.00  0.00  262.09  636,872.97 
5035+600.00  0.00  13.55  0.00  26.82  10.00  0.00  0.00  268.18  636,604.79 
5035+620.00  0.00  11.49  0.00  25.04  10.00  0.00  0.00  250.36  636,354.43 
5035+640.00  0.00  9.67  0.00  21.16  10.00  0.00  0.00  211.57  636,142.86 
5035+660.00  0.00  7.65  0.00  17.32  10.00  0.00  0.00  173.20  635,969.66 
5035+680.00  0.00  8.29  0.00  15.95  10.00  0.00  0.00  159.46  635,810.20 
5035+700.00  0.00  11.84  0.00  20.13  10.00  0.00  0.00  201.32  635,608.88 
5035+720.00  0.00  15.09  0.00  26.93  10.00  0.00  0.00  269.26  635,339.62 
5035+740.00  0.00  13.71  0.00  28.79  10.00  0.00  0.00  287.93  635,051.69 
5035+760.00  0.00  8.51  0.00  22.21  10.00  0.00  0.00  222.13  634,829.56 
5035+780.00  1.33  2.89  1.33  11.39  10.00  13.30  17.29  113.91  634,732.94 
5035+800.00  5.80  1.80  7.13  4.68  10.00  71.26  92.64  46.83  634,778.75 
5035+820.00  2.91  1.98  8.70  3.78  10.00  87.03  113.14  37.78  634,854.11 
5035+840.00  1.53  2.80  4.44  4.78  10.00  44.41  57.73  47.75  634,864.09 
5035+860.00  0.94  3.51  2.48  6.31  10.00  24.78  32.21  63.05  634,833.26 
5035+880.00  0.00  6.25  0.94  9.76  10.00  9.44  12.27  97.58  634,747.95 
5035+900.00  0.00  11.51  0.00  17.76  10.00  0.00  0.00  177.59  634,570.36 
5035+920.00  0.00  10.34  0.00  21.85  10.00  0.00  0.00  218.54  634,351.82 
5035+940.00  0.00  7.93  0.00  18.27  10.00  0.00  0.00  182.70  634,169.12 
5035+960.00  0.00  8.80  0.00  16.73  10.00  0.00  0.00  167.26  634,001.86 
5035+980.00  0.00  17.37  0.00  26.17  10.00  0.00  0.00  261.72  633,740.14 
5036+000.00  0.00  24.75  0.00  42.13  10.00  0.00  0.00  421.26  633,318.88 
5036+000.00  0.00  22.97  0.00  47.73  0.00  0.00  0.00  0.00  633,318.88 
5036+020.00  0.00  16.05  0.00  39.02  10.00  0.00  0.00  390.24  632,928.64 
5036+040.00  0.00  7.21  0.00  23.26  10.00  0.00  0.00  232.64  632,696.00 
5036+060.00  1.82  3.86  1.82  11.08  10.00  18.18  23.63  110.76  632,608.87 
5036+080.00  2.09  2.80  3.91  6.67  10.00  39.05  50.77  66.67  632,592.97 
5036+100.00  0.99  3.86  3.07  6.66  10.00  30.72  39.94  66.61  632,566.30 
5036+120.00  0.82  4.34  1.80  8.20  10.00  18.04  23.45  81.98  632,507.77 
5036+140.00  0.51  5.08  1.32  9.42  10.00  13.24  17.21  94.20  632,430.78 
5036+160.00  0.00  8.50  0.51  13.58  10.00  5.05  6.57  135.75  632,301.59 
5036+180.00  0.00  9.87  0.00  18.37  10.00  0.00  0.00  183.67  632,117.92 
5036+200.00  0.00  12.91  0.00  22.78  10.00  0.00  0.00  227.79  631,890.13 

235 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5036+220.00  0.00  12.67  0.00  25.58  10.00  0.00  0.00  255.76  631,634.37 
5036+240.00  0.00  14.16  0.00  26.83  10.00  0.00  0.00  268.26  631,366.11 
5036+260.00  0.00  17.35  0.00  31.50  10.00  0.00  0.00  315.04  631,051.07 
5036+280.00  0.00  16.00  0.00  33.35  10.00  0.00  0.00  333.50  630,717.57 
5036+300.00  0.00  16.32  0.00  32.33  10.00  0.00  0.00  323.28  630,394.29 
5036+320.00  0.00  21.24  0.00  37.57  10.00  0.00  0.00  375.68  630,018.61 
5036+340.00  0.00  20.36  0.00  41.61  10.00  0.00  0.00  416.08  629,602.53 
5036+360.00  0.00  16.12  0.00  36.48  10.00  0.00  0.00  364.81  629,237.72 
5036+360.00  0.00  17.56  0.00  33.67  0.00  0.00  0.00  0.00  629,237.72 
5036+380.00  0.00  27.83  0.00  45.38  10.00  0.00  0.00  453.82  628,783.90 
5036+400.00  0.00  34.77  0.00  62.59  10.00  0.00  0.00  625.94  628,157.96 
5036+420.00  0.00  32.07  0.00  66.84  10.00  0.00  0.00  668.37  627,489.59 
5036+440.00  0.00  28.70  0.00  60.77  10.00  0.00  0.00  607.66  626,881.93 
5036+460.00  0.00  25.40  0.00  54.10  10.00  0.00  0.00  540.99  626,340.94 
5036+480.00  0.00  26.86  0.00  52.27  10.00  0.00  0.00  522.66  625,818.28 
5036+500.00  0.00  26.36  0.00  53.23  10.00  0.00  0.00  532.25  625,286.03 
5036+500.00  0.00  23.85  0.00  50.22  0.00  0.00  0.00  0.00  625,286.03 
5036+520.00  0.00  21.50  0.00  45.35  10.00  0.00  0.00  453.50  624,832.53 
5036+540.00  0.00  21.40  0.00  42.90  10.00  0.00  0.00  429.00  624,403.53 
5036+560.00  0.00  23.48  0.00  44.88  10.00  0.00  0.00  448.81  623,954.72 
5036+580.00  0.00  20.38  0.00  43.86  10.00  0.00  0.00  438.58  623,516.14 
5036+600.00  0.00  15.23  0.00  35.61  10.00  0.00  0.00  356.11  623,160.03 
5036+620.00  0.00  16.88  0.00  32.11  10.00  0.00  0.00  321.11  622,838.92 
5036+640.00  0.00  24.23  0.00  41.11  10.00  0.00  0.00  411.06  622,427.86 
5036+660.00  0.00  25.10  0.00  49.32  10.00  0.00  0.00  493.21  621,934.65 
5036+680.00  0.00  23.09  0.00  48.19  10.00  0.00  0.00  481.87  621,452.78 
5036+700.00  0.00  19.24  0.00  42.33  10.00  0.00  0.00  423.29  621,029.49 
5036+720.00  0.00  17.81  0.00  37.05  10.00  0.00  0.00  370.52  620,658.97 
5036+740.00  0.00  18.85  0.00  36.66  10.00  0.00  0.00  366.62  620,292.35 
5036+760.00  0.00  19.53  0.00  38.38  10.00  0.00  0.00  383.75  619,908.60 
5036+780.00  0.00  17.96  0.00  37.48  10.00  0.00  0.00  374.82  619,533.78 
5036+800.00  0.00  18.14  0.00  36.09  10.00  0.00  0.00  360.94  619,172.84 
5036+820.00  0.00  19.50  0.00  37.64  10.00  0.00  0.00  376.39  618,796.45 
5036+840.00  0.00  21.40  0.00  40.90  10.00  0.00  0.00  408.98  618,387.47 
5036+860.00  0.00  24.19  0.00  45.58  10.00  0.00  0.00  455.84  617,931.63 
5036+880.00  0.00  25.79  0.00  49.97  10.00  0.00  0.00  499.74  617,431.89 
5036+900.00  0.00  27.56  0.00  53.35  10.00  0.00  0.00  533.48  616,898.41 
5036+920.00  0.00  26.36  0.00  53.92  10.00  0.00  0.00  539.17  616,359.24 
5036+940.00  0.00  22.61  0.00  48.97  10.00  0.00  0.00  489.70  615,869.54 
5036+960.00  0.00  23.81  0.00  46.43  10.00  0.00  0.00  464.26  615,405.28 
5036+980.00  0.00  20.31  0.00  44.12  10.00  0.00  0.00  441.21  614,964.07 
5037+000.00  0.00  16.48  0.00  36.79  10.00  0.00  0.00  367.90  614,596.17 
5037+020.00  0.00  13.12  0.00  29.60  10.00  0.00  0.00  296.00  614,300.17 
5037+040.00  0.00  15.84  0.00  28.96  10.00  0.00  0.00  289.59  614,010.58 
5037+060.00  0.00  18.51  0.00  34.35  10.00  0.00  0.00  343.51  613,667.07 

236 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5037+080.00  0.00  13.95  0.00  32.46  10.00  0.00  0.00  324.59  613,342.48 
5037+100.00  0.00  14.66  0.00  28.61  10.00  0.00  0.00  286.12  613,056.36 
5037+120.00  0.00  16.45  0.00  31.11  10.00  0.00  0.00  311.13  612,745.23 
5037+140.00  0.00  16.32  0.00  32.77  10.00  0.00  0.00  327.70  612,417.53 
5037+160.00  0.00  14.99  0.00  31.31  10.00  0.00  0.00  313.10  612,104.43 
5037+180.00  0.00  14.96  0.00  29.95  10.00  0.00  0.00  299.48  611,804.95 
5037+200.00  0.00  12.86  0.00  27.82  10.00  0.00  0.00  278.21  611,526.74 
5037+220.00  0.00  11.91  0.00  24.78  10.00  0.00  0.00  247.77  611,278.97 
5037+240.00  0.00  14.42  0.00  26.33  10.00  0.00  0.00  263.31  611,015.66 
5037+260.00  0.00  17.34  0.00  31.76  10.00  0.00  0.00  317.61  610,698.05 
5037+280.00  0.00  17.68  0.00  35.02  10.00  0.00  0.00  350.21  610,347.84 
5037+300.00  0.00  19.96  0.00  37.64  10.00  0.00  0.00  376.40  609,971.44 
5037+320.00  0.00  22.51  0.00  42.47  10.00  0.00  0.00  424.69  609,546.75 
5037+340.00  0.00  22.55  0.00  45.06  10.00  0.00  0.00  450.60  609,096.15 
5037+360.00  0.00  22.89  0.00  45.44  10.00  0.00  0.00  454.39  608,641.76 
5037+380.00  0.00  19.12  0.00  42.00  10.00  0.00  0.00  420.02  608,221.74 
5037+400.00  0.00  15.66  0.00  34.77  10.00  0.00  0.00  347.74  607,874.00 
5037+420.00  0.00  16.72  0.00  32.38  10.00  0.00  0.00  323.77  607,550.23 
5037+440.00  0.00  20.76  0.00  37.48  10.00  0.00  0.00  374.76  607,175.47 
5037+460.00  0.00  21.63  0.00  42.39  10.00  0.00  0.00  423.85  606,751.62 
5037+480.00  0.00  19.20  0.00  40.82  10.00  0.00  0.00  408.24  606,343.38 
5037+500.00  0.00  19.10  0.00  38.30  10.00  0.00  0.00  382.95  605,960.43 
5037+520.00  0.00  16.16  0.00  35.26  10.00  0.00  0.00  352.56  605,607.87 
5037+540.00  0.00  13.08  0.00  29.23  10.00  0.00  0.00  292.32  605,315.55 
5037+560.00  0.00  18.63  0.00  31.70  10.00  0.00  0.00  317.03  604,998.52 
5037+580.00  0.00  20.74  0.00  39.37  10.00  0.00  0.00  393.66  604,604.86 
5037+600.00  0.00  19.70  0.00  40.44  10.00  0.00  0.00  404.41  604,200.45 
5037+620.00  0.00  18.97  0.00  38.67  10.00  0.00  0.00  386.69  603,813.76 
5037+640.00  0.00  22.14  0.00  41.10  10.00  0.00  0.00  411.04  603,402.72 
5037+660.00  0.00  24.00  0.00  46.14  10.00  0.00  0.00  461.36  602,941.36 
5037+680.00  0.00  25.56  0.00  49.56  10.00  0.00  0.00  495.56  602,445.80 
5037+700.00  0.00  25.97  0.00  51.52  10.00  0.00  0.00  515.22  601,930.58 
5037+720.00  0.00  28.64  0.00  54.60  10.00  0.00  0.00  546.02  601,384.56 
5037+740.00  0.00  31.79  0.00  60.43  10.00  0.00  0.00  604.26  600,780.30 
5037+760.00  0.00  37.55  0.00  69.34  10.00  0.00  0.00  693.38  600,086.92 
5037+780.00  0.00  41.32  0.00  78.87  10.00  0.00  0.00  788.68  599,298.24 
5037+800.00  0.00  41.43  0.00  82.75  10.00  0.00  0.00  827.51  598,470.73 
5037+820.00  0.00  43.03  0.00  84.46  10.00  0.00  0.00  844.64  597,626.09 
5037+840.00  0.00  40.49  0.00  83.52  10.00  0.00  0.00  835.23  596,790.86 
5037+860.00  0.00  40.23  0.00  80.72  10.00  0.00  0.00  807.19  595,983.67 
5037+880.00  0.00  40.28  0.00  80.51  10.00  0.00  0.00  805.06  595,178.61 
5037+900.00  0.00  41.58  0.00  81.86  10.00  0.00  0.00  818.58  594,360.03 
5037+920.00  0.00  42.05  0.00  83.63  10.00  0.00  0.00  836.29  593,523.74 
5037+940.00  0.00  43.64  0.00  85.68  10.00  0.00  0.00  856.84  592,666.90 
5037+960.00  0.00  45.05  0.00  88.69  10.00  0.00  0.00  886.86  591,780.04 

237 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5037+980.00  0.00  44.66  0.00  89.71  10.00  0.00  0.00  897.06  590,882.98 
5038+000.00  0.00  42.40  0.00  87.06  10.00  0.00  0.00  870.56  590,012.42 
5038+020.00  0.00  36.71  0.00  79.11  10.00  0.00  0.00  791.09  589,221.33 
5038+040.00  0.00  32.88  0.00  69.58  10.00  0.00  0.00  695.83  588,525.50 
5038+060.00  0.00  31.54  0.00  64.42  10.00  0.00  0.00  644.15  587,881.35 
5038+080.00  0.00  31.18  0.00  62.72  10.00  0.00  0.00  627.15  587,254.20 
5038+100.00  0.00  32.54  0.00  63.72  10.00  0.00  0.00  637.18  586,617.02 
5038+120.00  0.00  32.86  0.00  65.40  10.00  0.00  0.00  654.04  585,962.98 
5038+140.00  0.00  34.61  0.00  67.47  10.00  0.00  0.00  674.69  585,288.29 
5038+160.00  0.00  31.16  0.00  65.77  10.00  0.00  0.00  657.70  584,630.59 
5038+180.00  0.00  27.92  0.00  59.08  10.00  0.00  0.00  590.79  584,039.80 
5038+200.00  0.00  26.28  0.00  54.19  10.00  0.00  0.00  541.93  583,497.87 
5038+220.00  0.00  24.17  0.00  50.45  10.00  0.00  0.00  504.45  582,993.42 
5038+240.00  0.00  20.19  0.00  44.35  10.00  0.00  0.00  443.54  582,549.88 
5038+260.00  0.00  18.43  0.00  38.61  10.00  0.00  0.00  386.13  582,163.75 
5038+280.00  0.00  17.11  0.00  35.53  10.00  0.00  0.00  355.33  581,808.42 
5038+300.00  0.00  14.57  0.00  31.67  10.00  0.00  0.00  316.73  581,491.69 
5038+320.00  0.00  12.16  0.00  26.73  10.00  0.00  0.00  267.32  581,224.37 
5038+340.00  0.00  11.07  0.00  23.23  10.00  0.00  0.00  232.32  580,992.05 
5038+360.00  0.00  13.75  0.00  24.82  10.00  0.00  0.00  248.20  580,743.85 
5038+380.00  0.00  15.60  0.00  29.35  10.00  0.00  0.00  293.52  580,450.33 
5038+400.00  0.00  13.08  0.00  28.68  10.00  0.00  0.00  286.84  580,163.49 
5038+420.00  0.00  12.29  0.00  25.37  10.00  0.00  0.00  253.72  579,909.77 
5038+440.00  0.00  13.01  0.00  25.30  10.00  0.00  0.00  252.98  579,656.79 
5038+460.00  0.00  15.91  0.00  28.92  10.00  0.00  0.00  289.24  579,367.55 
5038+480.00  0.00  15.44  0.00  31.35  10.00  0.00  0.00  313.53  579,054.02 
5038+500.00  0.00  16.41  0.00  31.85  10.00  0.00  0.00  318.51  578,735.51 
5038+520.00  0.00  15.32  0.00  31.74  10.00  0.00  0.00  317.36  578,418.15 
5038+540.00  0.00  16.56  0.00  31.88  10.00  0.00  0.00  318.79  578,099.36 
5038+560.00  0.00  19.28  0.00  35.84  10.00  0.00  0.00  358.37  577,740.99 
5038+580.00  0.00  15.82  0.00  35.10  10.00  0.00  0.00  351.02  577,389.97 
5038+600.00  0.00  10.28  0.00  26.10  10.00  0.00  0.00  261.04  577,128.93 
5038+620.00  0.00  9.91  0.00  20.20  10.00  0.00  0.00  201.96  576,926.97 
5038+640.00  0.00  9.80  0.00  19.71  10.00  0.00  0.00  197.12  576,729.85 
5038+660.00  0.00  9.99  0.00  19.79  10.00  0.00  0.00  197.86  576,531.99 
5038+680.00  0.00  11.09  0.00  21.07  10.00  0.00  0.00  210.72  576,321.27 
5038+700.00  0.00  10.17  0.00  21.26  10.00  0.00  0.00  212.58  576,108.69 
5038+720.00  0.00  12.32  0.00  22.49  10.00  0.00  0.00  224.88  575,883.81 
5038+740.00  0.00  18.31  0.00  30.63  10.00  0.00  0.00  306.25  575,577.56 
5038+760.00  0.00  20.87  0.00  39.18  10.00  0.00  0.00  391.82  575,185.74 
5038+780.00  0.00  21.05  0.00  41.93  10.00  0.00  0.00  419.26  574,766.48 
5038+800.00  0.00  23.57  0.00  44.63  10.00  0.00  0.00  446.27  574,320.21 
5038+820.00  0.00  24.76  0.00  48.34  10.00  0.00  0.00  483.35  573,836.86 
5038+840.00  0.00  25.27  0.00  50.03  10.00  0.00  0.00  500.29  573,336.57 
5038+860.00  0.00  25.01  0.00  50.28  10.00  0.00  0.00  502.76  572,833.81 

238 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5038+880.00  0.00  26.00  0.00  51.01  10.00  0.00  0.00  510.08  572,323.73 
5038+900.00  0.00  24.06  0.00  50.06  10.00  0.00  0.00  500.55  571,823.18 
5038+920.00  0.00  19.87  0.00  43.92  10.00  0.00  0.00  439.20  571,383.98 
5038+940.00  0.00  17.29  0.00  37.15  10.00  0.00  0.00  371.51  571,012.47 
5038+960.00  0.00  17.44  0.00  34.73  10.00  0.00  0.00  347.29  570,665.18 
5038+980.00  0.00  20.76  0.00  38.21  10.00  0.00  0.00  382.06  570,283.12 
5039+000.00  0.00  21.06  0.00  41.82  10.00  0.00  0.00  418.18  569,864.94 
5039+020.00  0.00  21.03  0.00  42.09  10.00  0.00  0.00  420.85  569,444.09 
5039+040.00  0.00  21.86  0.00  42.89  10.00  0.00  0.00  428.88  569,015.21 
5039+060.00  0.00  23.28  0.00  45.14  10.00  0.00  0.00  451.36  568,563.85 
5039+080.00  0.00  24.93  0.00  48.21  10.00  0.00  0.00  482.07  568,081.78 
5039+100.00  0.00  30.36  0.00  55.29  10.00  0.00  0.00  552.90  567,528.88 
5039+120.00  0.00  30.48  0.00  60.84  10.00  0.00  0.00  608.42  566,920.46 
5039+140.00  0.00  25.42  0.00  55.90  10.00  0.00  0.00  559.03  566,361.43 
5039+160.00  0.00  28.73  0.00  54.16  10.00  0.00  0.00  541.56  565,819.87 
5039+180.00  0.00  30.96  0.00  59.69  10.00  0.00  0.00  596.93  565,222.94 
5039+200.00  0.00  25.29  0.00  56.24  10.00  0.00  0.00  562.44  564,660.50 
5039+220.00  0.00  21.00  0.00  46.28  10.00  0.00  0.00  462.82  564,197.68 
5039+240.00  0.00  21.57  0.00  42.57  10.00  0.00  0.00  425.71  563,771.97 
5039+260.00  0.00  22.32  0.00  43.90  10.00  0.00  0.00  438.96  563,333.01 
5039+280.00  0.00  17.70  0.00  40.02  10.00  0.00  0.00  400.23  562,932.78 
5039+300.00  0.00  16.02  0.00  33.72  10.00  0.00  0.00  337.22  562,595.56 
5039+301.44  0.00  15.88  0.00  31.90  0.72  0.00  0.00  22.95  562,572.62 
5039+320.00  0.00  13.66  0.00  29.54  9.28  0.00  0.00  274.12  562,298.50 
5039+340.00  0.00  11.35  0.00  25.02  10.00  0.00  0.00  250.16  562,048.34 
5039+351.44  0.00  11.76  0.00  23.11  5.72  0.00  0.00  132.18  561,916.15 
5039+360.00  0.00  11.91  0.00  23.66  4.28  0.00  0.00  101.29  561,814.86 
5039+380.00  0.38  9.02  0.38  20.93  10.00  3.80  4.94  209.27  561,610.53 
5039+400.00  1.12  8.04  1.50  17.06  10.00  15.02  19.53  170.58  561,459.48 
5039+420.00  0.94  7.20  2.06  15.24  10.00  20.59  26.77  152.41  561,333.83 
5039+440.00  0.00  8.66  0.94  15.87  10.00  9.37  12.18  158.65  561,187.36 
5039+441.77  0.00  8.66  0.00  17.32  0.88  0.00  0.00  15.29  561,172.07 
5039+460.00  0.00  8.76  0.00  17.41  9.12  0.00  0.00  158.75  561,013.33 
5039+480.00  0.00  9.18  0.00  17.94  10.00  0.00  0.00  179.35  560,833.98 
5039+491.77  0.00  10.78  0.00  19.96  5.88  0.00  0.00  117.41  560,716.57 
5039+500.00  0.00  11.80  0.00  22.57  4.12  0.00  0.00  92.94  560,623.63 
5039+520.00  0.00  14.20  0.00  26.00  10.00  0.00  0.00  259.95  560,363.68 
5039+540.00  0.00  12.14  0.00  26.34  10.00  0.00  0.00  263.42  560,100.26 
5039+560.00  0.00  11.99  0.00  24.14  10.00  0.00  0.00  241.35  559,858.91 
5039+580.00  0.00  15.75  0.00  27.74  10.00  0.00  0.00  277.44  559,581.47 
5039+600.00  0.00  15.57  0.00  31.33  10.00  0.00  0.00  313.25  559,268.22 
5039+620.00  0.00  12.60  0.00  28.17  10.00  0.00  0.00  281.74  558,986.48 
5039+640.00  0.00  14.21  0.00  26.81  10.00  0.00  0.00  268.09  558,718.39 
5039+660.00  0.00  17.11  0.00  31.31  10.00  0.00  0.00  313.14  558,405.25 
5039+680.00  0.00  16.80  0.00  33.90  10.00  0.00  0.00  339.00  558,066.25 

239 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5039+700.00  0.00  9.82  0.00  26.61  10.00  0.00  0.00  266.10  557,800.15 
5039+720.00  0.00  9.54  0.00  19.35  10.00  0.00  0.00  193.53  557,606.62 
5039+740.00  0.00  11.17  0.00  20.71  10.00  0.00  0.00  207.11  557,399.51 
5039+760.00  0.00  14.48  0.00  25.65  10.00  0.00  0.00  256.50  557,143.01 
5039+780.00  0.00  15.31  0.00  29.78  10.00  0.00  0.00  297.83  556,845.18 
5039+800.00  0.00  13.68  0.00  28.99  10.00  0.00  0.00  289.87  556,555.31 
5039+820.00  0.00  10.61  0.00  24.29  10.00  0.00  0.00  242.89  556,312.42 
5039+840.00  0.00  6.57  0.00  17.18  10.00  0.00  0.00  171.79  556,140.63 
5039+860.00  0.00  6.99  0.00  13.56  10.00  0.00  0.00  135.59  556,005.04 
5039+880.00  0.00  11.28  0.00  18.27  10.00  0.00  0.00  182.71  555,822.33 
5039+900.00  0.00  10.39  0.00  21.67  10.00  0.00  0.00  216.74  555,605.59 
5039+920.00  0.00  10.26  0.00  20.65  10.00  0.00  0.00  206.54  555,399.05 
5039+940.00  0.00  12.61  0.00  22.87  10.00  0.00  0.00  228.71  555,170.34 
5039+960.00  0.00  14.18  0.00  26.78  10.00  0.00  0.00  267.83  554,902.51 
5039+980.00  0.00  11.43  0.00  25.60  10.00  0.00  0.00  256.00  554,646.51 
5040+000.00  0.00  11.41  0.00  22.84  10.00  0.00  0.00  228.38  554,418.13 
5040+020.00  0.00  11.01  0.00  22.43  10.00  0.00  0.00  224.27  554,193.86 
5040+040.00  1.03  6.78  1.03  17.79  10.00  10.34  13.44  177.89  554,029.42 
5040+060.00  0.81  4.68  1.85  11.45  10.00  18.45  23.99  114.54  553,938.86 
5040+080.00  0.89  3.78  1.71  8.45  10.00  17.05  22.17  84.54  553,876.49 
5040+100.00  9.46  1.99  10.36  5.77  10.00  103.57  134.64  57.65  553,953.48 
5040+120.00  6.73  3.01  16.20  5.00  10.00  161.97  210.56  50.02  554,114.02 
5040+140.00  0.00  12.65  6.73  15.66  10.00  67.34  87.54  156.60  554,044.96 
5040+160.00  0.00  14.07  0.00  26.72  10.00  0.00  0.00  267.15  553,777.81 
5040+180.00  0.00  12.65  0.00  26.72  10.00  0.00  0.00  267.20  553,510.61 
5040+200.00  0.00  11.16  0.00  23.81  10.00  0.00  0.00  238.10  553,272.51 
5040+220.00  0.00  15.05  0.00  26.21  10.00  0.00  0.00  262.05  553,010.46 
5040+240.00  0.00  18.63  0.00  33.67  10.00  0.00  0.00  336.73  552,673.73 
5040+260.00  0.00  18.05  0.00  36.68  10.00  0.00  0.00  366.79  552,306.94 
5040+280.00  0.00  19.96  0.00  38.01  10.00  0.00  0.00  380.11  551,926.83 
5040+300.00  0.00  22.91  0.00  42.87  10.00  0.00  0.00  428.65  551,498.18 
5040+320.00  0.00  15.05  0.00  37.96  10.00  0.00  0.00  379.58  551,118.60 
5040+340.00  0.00  17.54  0.00  32.59  10.00  0.00  0.00  325.90  550,792.70 
5040+360.00  0.00  26.82  0.00  44.36  10.00  0.00  0.00  443.62  550,349.08 
5040+380.00  0.00  36.66  0.00  63.48  10.00  0.00  0.00  634.77  549,714.31 
5040+400.00  0.00  40.15  0.00  76.81  10.00  0.00  0.00  768.07  548,946.24 
5040+420.00  0.00  37.95  0.00  78.10  10.00  0.00  0.00  781.04  548,165.20 
5040+440.00  0.00  39.60  0.00  77.55  10.00  0.00  0.00  775.49  547,389.71 
5040+460.00  0.00  67.58  0.00  107.17  10.00  0.00  0.00  1071.73  546,317.98 
5040+480.00  0.00  95.67  0.00  163.25  10.00  0.00  0.00  1632.50  544,685.48 
5040+500.00  0.00  87.87  0.00  183.54  10.00  0.00  0.00  1835.41  542,850.07 
5040+520.00  0.00  68.46  0.00  156.33  10.00  0.00  0.00  1563.31  541,286.76 
5040+540.00  0.00  49.93  0.00  118.40  10.00  0.00  0.00  1183.95  540,102.81 
5040+540.00  0.00  0.00  0.00  49.93  0.00  0.00  0.00  0.00  540,102.81 
5040+540.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  540,102.81 

240 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5040+560.00  0.00  0.00  0.00  0.00  10.00  0.00  0.00  0.00  540,102.81 
5040+571.00  0.00  0.00  0.00  0.00  5.50  0.00  0.00  0.00  540,102.81 
5040+571.00  0.00  53.12  0.00  53.12  0.00  0.00  0.00  0.00  540,102.81 
5040+571.00  0.00  48.49  0.00  101.61  0.00  0.00  0.00  0.05  540,102.76 
5040+580.00  0.00  51.36  0.00  99.85  4.50  0.00  0.00  449.26  539,653.50 
5040+600.00  0.00  56.58  0.00  107.94  10.00  0.00  0.00  1079.40  538,574.10 
5040+620.00  0.00  56.17  0.00  112.75  10.00  0.00  0.00  1127.51  537,446.59 
5040+640.00  0.00  54.18  0.00  110.34  10.00  0.00  0.00  1103.44  536,343.15 
5040+660.00  0.00  52.07  0.00  106.24  10.00  0.00  0.00  1062.43  535,280.72 
5040+680.00  0.00  50.50  0.00  102.57  10.00  0.00  0.00  1025.72  534,255.00 
5040+700.00  0.00  42.64  0.00  93.15  10.00  0.00  0.00  931.46  533,323.54 
5040+720.00  0.00  33.35  0.00  75.99  10.00  0.00  0.00  759.93  532,563.61 
5040+740.00  0.00  34.19  0.00  67.54  10.00  0.00  0.00  675.36  531,888.25 
5040+760.00  0.00  44.34  0.00  78.53  10.00  0.00  0.00  785.26  531,102.99 
5040+780.00  0.00  51.07  0.00  95.41  10.00  0.00  0.00  954.06  530,148.93 
5040+800.00  0.00  48.40  0.00  99.46  10.00  0.00  0.00  994.61  529,154.32 
5040+820.00  0.00  49.76  0.00  98.15  10.00  0.00  0.00  981.51  528,172.81 
5040+840.00  0.00  55.27  0.00  105.03  10.00  0.00  0.00  1050.26  527,122.55 
5040+860.00  0.00  51.21  0.00  106.49  10.00  0.00  0.00  1064.85  526,057.70 
5040+880.00  0.00  46.12  0.00  97.34  10.00  0.00  0.00  973.36  525,084.34 
5040+900.00  0.00  43.93  0.00  90.06  10.00  0.00  0.00  900.56  524,183.78 
5040+920.00  0.00  41.43  0.00  85.36  10.00  0.00  0.00  853.60  523,330.18 
5040+940.00  0.00  31.14  0.00  72.57  10.00  0.00  0.00  725.69  522,604.49 
5040+960.00  0.00  28.68  0.00  59.82  10.00  0.00  0.00  598.24  522,006.25 
5040+980.00  0.00  36.32  0.00  65.00  10.00  0.00  0.00  649.96  521,356.29 
5041+000.00  0.00  46.29  0.00  82.60  10.00  0.00  0.00  826.02  520,530.27 
5041+020.00  0.00  49.41  0.00  95.70  10.00  0.00  0.00  956.98  519,573.29 
5041+040.00  0.00  48.95  0.00  98.37  10.00  0.00  0.00  983.65  518,589.64 
5041+060.00  0.00  49.68  0.00  98.63  10.00  0.00  0.00  986.34  517,603.30 
5041+080.00  0.00  49.58  0.00  99.26  10.00  0.00  0.00  992.58  516,610.72 
5041+100.00  0.00  45.09  0.00  94.67  10.00  0.00  0.00  946.68  515,664.04 
5041+120.00  0.00  39.70  0.00  84.79  10.00  0.00  0.00  847.94  514,816.10 
5041+140.00  0.00  35.93  0.00  75.63  10.00  0.00  0.00  756.31  514,059.79 
5041+160.00  0.00  37.95  0.00  73.87  10.00  0.00  0.00  738.74  513,321.05 
5041+180.00  0.00  40.69  0.00  78.63  10.00  0.00  0.00  786.33  512,534.72 
5041+200.00  0.00  46.69  0.00  87.38  10.00  0.00  0.00  873.77  511,660.95 
5041+200.00  0.00  47.73  0.00  94.43  0.00  0.00  0.00  0.00  511,660.95 
5041+220.00  0.00  49.71  0.00  97.45  10.00  0.00  0.00  974.46  510,686.49 
5041+235.00  0.00  42.97  0.00  92.68  7.50  0.00  0.00  695.10  509,991.39 
5041+235.00  0.00  0.00  0.00  42.97  0.00  0.00  0.00  0.00  509,991.39 
5041+235.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  509,991.39 
5041+240.00  0.00  0.00  0.00  0.00  2.50  0.00  0.00  0.00  509,991.39 
5041+250.00  0.00  0.00  0.00  0.00  5.00  0.00  0.00  0.00  509,991.39 
5041+250.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  509,991.39 
5041+260.00  0.00  0.00  0.00  0.00  5.00  0.00  0.00  0.00  509,991.39 

241 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5041+268.00  0.00  0.00  0.00  0.00  4.00  0.00  0.00  0.00  509,991.39 
5041+268.00  0.00  34.78  0.00  34.78  0.00  0.00  0.00  0.00  509,991.39 
5041+268.00  0.00  29.43  0.00  64.22  0.00  0.00  0.00  0.03  509,991.36 
5041+280.00  0.00  29.61  0.00  59.04  6.00  0.00  0.00  354.23  509,637.13 
5041+300.00  0.00  39.42  0.00  69.03  10.00  0.00  0.00  690.30  508,946.83 
5041+320.00  0.00  44.62  0.00  84.04  10.00  0.00  0.00  840.39  508,106.44 
5041+340.00  0.00  45.58  0.00  90.19  10.00  0.00  0.00  901.94  507,204.50 
5041+360.00  0.00  45.69  0.00  91.26  10.00  0.00  0.00  912.61  506,291.89 
5041+370.00  0.00  45.86  0.00  91.54  5.00  0.00  0.00  457.72  505,834.17 
5041+370.00  0.00  0.00  0.00  45.86  0.00  0.00  0.00  0.00  505,834.17 
5041+370.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  505,834.17 
5041+380.00  0.00  0.00  0.00  0.00  5.00  0.00  0.00  0.00  505,834.17 
5041+400.00  0.00  0.00  0.00  0.00  10.00  0.00  0.00  0.00  505,834.17 
5041+402.00  0.00  0.00  0.00  0.00  1.00  0.00  0.00  0.00  505,834.17 
5041+402.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  505,834.17 
5041+402.00  0.00  53.09  0.00  53.09  0.00  0.00  0.00  0.00  505,834.17 
5041+402.00  0.00  46.75  0.00  99.84  0.00  0.00  0.00  0.05  505,834.12 
5041+420.00  0.00  44.64  0.00  91.40  9.00  0.00  0.00  822.53  505,011.59 
5041+440.00  0.00  39.66  0.00  84.30  10.00  0.00  0.00  843.04  504,168.55 
5041+460.00  0.00  41.86  0.00  81.52  10.00  0.00  0.00  815.23  503,353.32 
5041+480.00  0.00  42.22  0.00  84.08  10.00  0.00  0.00  840.84  502,512.48 
5041+500.00  0.00  40.11  0.00  82.33  10.00  0.00  0.00  823.26  501,689.22 
5041+520.00  0.00  37.44  0.00  77.55  10.00  0.00  0.00  775.46  500,913.76 
5041+540.00  0.00  26.99  0.00  64.43  10.00  0.00  0.00  644.31  500,269.45 
5041+560.00  0.00  28.42  0.00  55.41  10.00  0.00  0.00  554.07  499,715.38 
5041+580.00  0.00  35.19  0.00  63.61  10.00  0.00  0.00  636.08  499,079.30 
5041+600.00  0.00  36.53  0.00  71.72  10.00  0.00  0.00  717.19  498,362.11 
5041+620.00  0.00  33.57  0.00  70.10  10.00  0.00  0.00  700.98  497,661.13 
5041+640.00  0.00  30.68  0.00  64.25  10.00  0.00  0.00  642.51  497,018.62 
5041+660.00  0.00  26.26  0.00  56.94  10.00  0.00  0.00  569.42  496,449.20 
5041+680.00  0.00  20.00  0.00  46.26  10.00  0.00  0.00  462.59  495,986.61 
5041+700.00  0.00  17.95  0.00  37.95  10.00  0.00  0.00  379.47  495,607.14 
5041+720.00  0.00  19.49  0.00  37.44  10.00  0.00  0.00  374.37  495,232.77 
5041+740.00  0.00  16.85  0.00  36.34  10.00  0.00  0.00  363.36  494,869.41 
5041+760.00  0.00  13.67  0.00  30.52  10.00  0.00  0.00  305.15  494,564.26 
5041+780.00  0.00  12.02  0.00  25.69  10.00  0.00  0.00  256.86  494,307.40 
5041+800.00  0.00  7.72  0.00  19.74  10.00  0.00  0.00  197.43  494,109.97 
5041+820.00  0.00  8.21  0.00  15.93  10.00  0.00  0.00  159.33  493,950.64 
5041+840.00  0.00  9.32  0.00  17.53  10.00  0.00  0.00  175.28  493,775.36 
5041+860.00  0.00  10.00  0.00  19.31  10.00  0.00  0.00  193.14  493,582.22 
5041+880.00  0.00  12.24  0.00  22.24  10.00  0.01  0.01  222.36  493,359.88 
5041+900.00  0.00  9.05  0.00  21.29  10.00  0.02  0.03  212.94  493,146.96 
5041+920.00  0.00  9.03  0.00  18.08  10.00  0.03  0.04  180.81  492,966.19 
5041+940.00  0.00  7.46  0.01  16.48  10.00  0.05  0.07  164.83  492,801.43 
5041+960.00  0.01  6.96  0.01  14.41  10.00  0.10  0.13  144.13  492,657.43 

242 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5041+980.00  0.04  6.66  0.05  13.62  10.00  0.45  0.59  136.16  492,521.85 
5042+000.00  0.03  9.15  0.06  15.81  10.00  0.64  0.83  158.11  492,364.57 
5042+002.37  0.02  9.30  0.05  18.46  1.18  0.06  0.08  21.86  492,342.79 
5042+020.00  0.01  10.39  0.03  19.69  8.82  0.30  0.39  173.60  492,169.58 
5042+032.37  0.01  10.70  0.02  21.10  6.18  0.14  0.18  130.46  492,039.30 
5042+040.00  0.02  10.81  0.03  21.52  3.82  0.11  0.14  82.09  491,957.35 
5042+060.00  0.03  6.80  0.05  17.61  10.00  0.47  0.61  176.11  491,781.85 
5042+080.00  0.03  5.85  0.06  12.65  10.00  0.61  0.79  126.53  491,656.11 
5042+100.00  0.01  7.94  0.04  13.80  10.00  0.41  0.53  137.97  491,518.68 
5042+120.00  0.01  6.70  0.02  14.65  10.00  0.24  0.31  146.47  491,372.52 
5042+120.89  0.01  6.58  0.03  13.28  0.44  0.01  0.01  5.90  491,366.63 
5042+140.00  0.03  4.13  0.05  10.70  9.56  0.44  0.57  102.24  491,264.96 
5042+150.89  0.00  4.32  0.04  8.45  5.44  0.20  0.25  45.98  491,219.23 
5042+160.00  0.00  4.48  0.00  8.80  4.56  0.01  0.02  40.10  491,179.15 
5042+180.00  0.00  3.41  0.00  7.89  10.00  0.00  0.00  78.86  491,100.29 
5042+200.00  0.69  1.95  0.69  5.36  10.00  6.91  8.98  53.55  491,055.72 
5042+220.00  0.00  3.72  0.69  5.67  10.00  6.91  8.98  56.71  491,007.99 
5042+240.00  0.00  7.00  0.00  10.72  10.00  0.02  0.03  107.19  490,900.83 
5042+260.00  0.00  8.99  0.00  15.99  10.00  0.02  0.03  159.91  490,740.95 
5042+280.00  0.00  9.60  0.00  18.59  10.00  0.00  0.00  185.88  490,555.07 
5042+300.00  0.00  7.21  0.00  16.80  10.00  0.00  0.00  168.03  490,387.04 
5042+320.00  0.00  4.86  0.00  12.07  10.00  0.00  0.00  120.65  490,266.39 
5042+340.00  0.64  5.65  0.64  10.51  10.00  6.41  8.33  105.10  490,169.62 
5042+360.00  0.00  7.21  0.64  12.87  10.00  6.41  8.33  128.66  490,049.29 
5042+380.00  0.00  4.25  0.00  11.46  10.00  0.00  0.00  114.58  489,934.71 
5042+400.00  0.68  4.20  0.68  8.45  10.00  6.75  8.78  84.48  489,859.01 
5042+420.00  0.00  4.86  0.68  9.06  10.00  6.75  8.78  90.64  489,777.14 
5042+440.00  0.00  8.17  0.00  13.03  10.00  0.00  0.00  130.29  489,646.85 
5042+460.00  0.00  7.65  0.00  15.81  10.00  0.00  0.00  158.13  489,488.72 
5042+460.03  0.00  7.64  0.00  15.29  0.01  0.00  0.00  0.22  489,488.50 
5042+470.00  0.00  6.14  0.00  13.78  4.99  0.00  0.00  68.71  489,419.80 
5042+480.00  0.57  4.93  0.57  11.07  5.00  2.87  3.73  55.36  489,368.17 
5042+480.03  0.58  4.93  1.15  9.86  0.01  0.02  0.02  0.14  489,368.05 
5042+490.00  0.74  4.25  1.31  9.18  4.99  6.55  8.52  45.76  489,330.81 
5042+500.00  0.88  3.74  1.62  7.99  5.00  8.10  10.53  39.93  489,301.41 
5042+510.00  0.00  4.38  0.88  8.12  5.00  4.41  5.73  40.59  489,266.55 
5042+520.00  0.00  5.03  0.00  9.41  5.00  0.00  0.00  47.05  489,219.50 
5042+530.00  0.00  5.18  0.00  10.21  5.00  0.00  0.00  51.04  489,168.47 
5042+540.00  0.00  5.75  0.00  10.93  5.00  0.00  0.00  54.64  489,113.83 
5042+550.00  0.00  6.15  0.00  11.90  5.00  0.00  0.00  59.48  489,054.35 
5042+560.00  0.04  6.70  0.04  12.85  5.00  0.18  0.23  64.24  488,990.34 
5042+570.00  0.00  9.49  0.04  16.18  5.00  0.18  0.23  80.92  488,909.65 
5042+580.00  0.00  12.74  0.00  22.23  5.00  0.00  0.00  111.15  488,798.51 
5042+590.00  0.00  13.04  0.00  25.79  5.00  0.00  0.00  128.94  488,669.57 
5042+600.00  0.00  14.13  0.00  27.17  5.00  0.02  0.02  135.86  488,533.73 

243 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000  

5042+600.00  0.00  17.30  0.00  31.43  0.00  0.00  0.00  0.00  488,533.73 
5042+610.00  0.00  19.23  0.00  36.53  5.00  0.00  0.00  182.67  488,351.07 
5042+620.00  0.00  16.44  0.00  35.67  5.00  0.00  0.00  178.34  488,172.73 
5042+630.00  0.86  5.84  0.86  22.27  5.00  4.31  5.60  111.37  488,066.97 
5042+640.00  0.94  7.01  1.80  12.85  5.00  8.99  11.68  64.26  488,014.39 
5042+650.00  0.36  6.24  1.30  13.25  5.00  6.49  8.43  66.26  487,956.57 
5042+660.00  0.34  6.04  0.70  12.28  5.00  3.49  4.53  61.40  487,899.70 
5042+680.00  0.19  5.95  0.53  12.00  10.00  5.29  6.88  119.96  487,786.62 
5042+700.00  0.35  6.04  0.54  11.99  10.00  5.42  7.05  119.90  487,673.77 
5042+720.00  0.00  9.17  0.35  15.20  10.00  3.48  4.52  152.04  487,526.25 
5042+740.00  0.00  12.95  0.00  22.12  10.00  0.00  0.00  221.20  487,305.05 
5042+760.00  0.64  7.92  0.64  20.87  10.00  6.43  8.36  208.74  487,104.67 
5042+780.00  0.00  7.61  0.64  15.53  10.00  6.43  8.36  155.32  486,957.71 
5042+800.00  0.01  8.61  0.01  16.22  10.00  0.06  0.08  162.20  486,795.59 
5042+800.00  0.01  8.61  0.01  17.22  0.00  0.00  0.00  0.00  486,795.59 
5042+820.00  0.01  10.93  0.01  19.54  10.00  0.14  0.18  195.40  486,600.37 
5042+840.00  0.00  10.95  0.01  21.88  10.00  0.08  0.10  218.78  486,381.69 
5042+860.00  0.00  12.37  0.00  23.32  10.00  0.00  0.00  233.22  486,148.47 
5042+862.97  0.00  11.70  0.00  24.08  1.48  0.00  0.00  35.76  486,112.72 
5042+880.00  0.00  8.22  0.00  19.92  8.52  0.02  0.02  169.64  485,943.10 
5042+900.00  0.00  9.22  0.00  17.44  10.00  0.02  0.03  174.43  485,768.69 
5042+920.00  0.00  14.79  0.00  24.01  10.00  0.00  0.00  240.09  485,528.60 
5042+940.00  0.00  14.27  0.00  29.06  10.00  0.00  0.00  290.55  485,238.05 
5042+960.00  0.00  16.26  0.00  30.53  10.00  0.00  0.00  305.30  484,932.75 
5042+980.00  0.00  14.85  0.00  31.11  10.00  0.00  0.00  311.12  484,621.63 
5043+000.00  0.00  20.21  0.00  35.06  10.00  0.00  0.00  350.63  484,271.00 
 

TABLA 26 CÁLCULO DE CURVA MASA DEL TRAMO DEL 5071+500 – 6006+000 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

5071+500.00  0.0000  8.6420                    1,300,000.00


5071+520.00  0.0000  8.7430  0.00  17.39  10.00  0.00  0.00  173.85  1,299,826.15
5071+540.00  0.0000  13.5420  0.00  22.29  10.00  0.00  0.00  222.85  1,299,603.30
5071+560.00  0.0000  10.9670  0.00  24.51  10.00  0.00  0.00  245.09  1,299,358.21
5071+580.00  1.1220  1.4210  1.12  12.39  10.00  11.22  14.59  123.88  1,299,248.92
5071+580.00  0.7150  3.3620  1.84  4.78  0.00  0.00  0.00  0.00  1,299,248.92
5071+600.00  0.0000  6.5530  0.72  9.92  10.00  7.15  9.30  99.15  1,299,159.06
5071+620.00  0.0000  12.1090  0.00  18.66  10.00  0.00  0.00  186.62  1,298,972.44
5071+640.00  0.0000  14.5190  0.00  26.63  10.00  0.00  0.00  266.28  1,298,706.16
5071+660.00  0.0000  16.4730  0.00  30.99  10.00  0.00  0.00  309.92  1,298,396.24

244 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

5071+660.00  0.0000  16.4720  0.00  32.95  0.00  0.00  0.00  0.02  1,298,396.22
5071+680.00  0.0000  15.8670  0.00  32.34  10.00  0.00  0.00  323.37  1,298,072.85
5071+700.00  0.0000  15.9280  0.00  31.80  10.00  0.00  0.00  317.95  1,297,754.90
5071+720.00  0.0000  12.7050  0.00  28.63  10.00  0.00  0.00  286.33  1,297,468.57
5071+740.00  0.0000  12.1130  0.00  24.82  10.00  0.00  0.00  248.18  1,297,220.39
5071+760.00  0.0000  20.7980  0.00  32.91  10.00  0.00  0.00  329.11  1,296,891.28
5071+780.00  0.0000  20.5030  0.00  41.30  10.00  0.00  0.00  413.01  1,296,478.27
5071+800.00  0.0000  15.6350  0.00  36.14  10.00  0.00  0.00  361.38  1,296,116.89
5071+820.00  0.0000  13.8470  0.00  29.48  10.00  0.00  0.00  294.82  1,295,822.07
5071+840.00  0.0000  16.3400  0.00  30.19  10.00  0.00  0.00  301.87  1,295,520.20
5071+860.00  5.3450  0.1790  5.35  16.52  10.00  53.45  69.49  165.19  1,295,424.50
5071+880.00  3.8310  0.1860  9.18  0.37  10.00  91.76  119.29  3.65  1,295,540.13
5071+900.00  0.0000  20.4640  3.83  20.65  10.00  38.31  49.80  206.50  1,295,383.44
5071+920.00  0.0000  36.0740  0.00  56.54  10.00  0.00  0.00  565.38  1,294,818.06
5071+940.00  0.0000  39.6380  0.00  75.71  10.00  0.00  0.00  757.12  1,294,060.94
5071+960.00  0.0000  34.5980  0.00  74.24  10.00  0.00  0.00  742.36  1,293,318.58
5071+980.00  0.0000  32.4420  0.00  67.04  10.00  0.00  0.00  670.40  1,292,648.18
5072+000.00  0.0000  43.2850  0.00  75.73  10.00  0.00  0.00  757.27  1,291,890.91
5072+020.00  0.0000  44.6750  0.00  87.96  10.00  0.00  0.00  879.60  1,291,011.31
5072+040.00  0.0000  37.2710  0.00  81.95  10.00  0.00  0.00  819.46  1,290,191.85
5072+060.00  0.0000  29.0060  0.00  66.28  10.00  0.00  0.00  662.77  1,289,529.08
5072+080.00  0.0000  30.4080  0.00  59.41  10.00  0.00  0.00  594.14  1,288,934.94
5072+100.00  0.0000  29.8730  0.00  60.28  10.00  0.00  0.00  602.81  1,288,332.13
5072+120.00  0.0000  41.0770  0.00  70.95  10.00  0.00  0.00  709.50  1,287,622.63
5072+140.00  0.0000  42.7540  0.00  83.83  10.00  0.00  0.00  838.31  1,286,784.32
5072+145.35  0.0000  42.5960  0.00  85.35  2.67  0.00  0.00  228.18  1,286,556.13
5072+160.00  0.0000  37.3200  0.00  79.92  7.33  0.00  0.00  585.50  1,285,970.63
5072+165.35  0.0000  33.8710  0.00  71.19  2.67  0.00  0.00  190.33  1,285,780.30
5072+175.00  0.0000  28.6060  0.00  62.48  4.83  0.00  0.00  301.55  1,285,478.75
5072+180.00  0.0000  30.3300  0.00  58.94  2.50  0.00  0.00  147.34  1,285,331.41
5072+185.00  0.0000  32.2760  0.00  62.61  2.50  0.00  0.00  156.52  1,285,174.90
5072+195.00  0.0000  36.0640  0.00  68.34  5.00  0.00  0.00  341.70  1,284,833.20
5072+200.00  0.0000  34.9130  0.00  70.98  2.50  0.00  0.00  177.44  1,284,655.76
5072+205.00  0.0000  34.0760  0.00  68.99  2.50  0.00  0.00  172.47  1,284,483.28
5072+215.00  0.0000  34.1800  0.00  68.26  5.00  0.00  0.00  341.28  1,284,142.00
5072+220.00  0.0000  35.2970  0.00  69.48  2.50  0.00  0.00  173.69  1,283,968.31
5072+225.00  0.0000  36.3780  0.00  71.68  2.50  0.00  0.00  179.19  1,283,789.12
5072+235.00  0.0000  37.8450  0.00  74.22  5.00  0.00  0.00  371.12  1,283,418.01
5072+240.00  0.0000  36.7120  0.00  74.56  2.50  0.00  0.00  186.39  1,283,231.62
5072+245.00  0.0000  35.4430  0.00  72.16  2.50  0.00  0.00  180.39  1,283,051.23
5072+255.00  0.0000  31.1130  0.00  66.56  5.00  0.00  0.00  332.78  1,282,718.45
5072+260.00  0.0000  26.8480  0.00  57.96  2.50  0.00  0.00  144.90  1,282,573.55
5072+265.00  0.0000  23.2330  0.00  50.08  2.50  0.00  0.00  125.20  1,282,448.34
5072+275.00  0.0000  21.5150  0.00  44.75  5.00  0.00  0.00  223.74  1,282,224.60
5072+280.00  0.0000  25.1440  0.00  46.66  2.50  0.00  0.00  116.65  1,282,107.96

245 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

5072+285.00  0.0000  28.7550  0.00  53.90  2.50  0.00  0.00  134.75  1,281,973.21
5072+295.00  0.0000  35.0720  0.00  63.83  5.00  0.00  0.00  319.14  1,281,654.07
5072+300.00  0.0000  36.8020  0.00  71.87  2.50  0.00  0.00  179.69  1,281,474.39
5072+305.00  0.0000  38.8590  0.00  75.66  2.50  0.00  0.00  189.15  1,281,285.24
5072+315.00  0.0000  41.5650  0.00  80.42  5.00  0.00  0.00  402.12  1,280,883.12
5072+320.00  0.0000  42.3490  0.00  83.91  2.50  0.00  0.00  209.79  1,280,673.33
5072+325.00  0.0000  43.4710  0.00  85.82  2.50  0.00  0.00  214.55  1,280,458.78
5072+335.00  0.0000  43.5700  0.00  87.04  5.00  0.00  0.00  435.21  1,280,023.58
5072+340.00  0.0000  40.6970  0.00  84.27  2.50  0.00  0.00  210.67  1,279,812.91
5072+360.00  0.0000  34.1330  0.00  74.83  10.00  0.00  0.00  748.30  1,279,064.61
5072+380.00  0.0000  43.2380  0.00  77.37  10.00  0.00  0.00  773.71  1,278,290.90
5072+400.00  0.0000  43.6300  0.00  86.87  10.00  0.00  0.00  868.68  1,277,422.22
5072+420.00  0.0000  39.0690  0.00  82.70  10.00  0.00  0.00  826.99  1,276,595.23
5072+440.00  0.0000  39.3840  0.00  78.45  10.00  0.00  0.00  784.53  1,275,810.70
5072+460.00  0.0000  33.8360  0.00  73.22  10.00  0.00  0.00  732.20  1,275,078.50
5072+480.00  0.0000  25.7100  0.00  59.55  10.00  0.00  0.00  595.46  1,274,483.04
5072+500.00  0.0000  26.9420  0.00  52.65  10.00  0.00  0.00  526.52  1,273,956.52
5072+520.00  0.0000  19.8750  0.00  46.82  10.00  0.00  0.00  468.17  1,273,488.35
5072+540.00  0.7740  7.4670  0.77  27.34  10.00  7.74  10.06  273.42  1,273,224.99
5072+560.00  0.0000  14.8630  0.77  22.33  10.00  7.74  10.06  223.30  1,273,011.75
5072+580.00  0.0000  20.5390  0.00  35.40  10.00  0.00  0.00  354.02  1,272,657.73
5072+600.00  0.0000  21.0200  0.00  41.56  10.00  0.00  0.00  415.59  1,272,242.14
5072+620.00  0.0000  23.1710  0.00  44.19  10.00  0.00  0.00  441.91  1,271,800.23
5072+640.00  0.0000  26.3210  0.00  49.49  10.00  0.00  0.00  494.92  1,271,305.31
5072+660.00  0.0000  29.5590  0.00  55.88  10.00  0.00  0.00  558.80  1,270,746.51
5072+660.00  0.0000  39.0950  0.00  68.65  0.00  0.00  0.00  0.00  1,270,746.51
5072+680.00  0.0000  32.4530  0.00  71.55  10.00  0.00  0.00  715.48  1,270,031.03
5072+700.00  0.0000  30.3350  0.00  62.79  10.00  0.00  0.00  627.88  1,269,403.15
5072+720.00  0.0000  23.9650  0.00  54.30  10.00  0.00  0.00  543.00  1,268,860.15
5072+740.00  0.0000  18.0020  0.00  41.97  10.00  0.00  0.00  419.67  1,268,440.48
5072+760.00  0.0000  28.1320  0.00  46.13  10.00  0.00  0.00  461.34  1,267,979.14
5072+760.00  0.0000  21.9650  0.00  50.10  0.00  0.00  0.00  0.00  1,267,979.14
5072+780.00  0.0000  25.0610  0.00  47.03  10.00  0.00  0.00  470.26  1,267,508.88
5072+795.00  0.0000  23.1880  0.00  48.25  7.50  0.00  0.00  361.87  1,267,147.02
5072+800.00  0.0000  24.5390  0.00  47.73  2.50  0.00  0.00  119.32  1,267,027.70
5072+820.00  0.0000  25.5480  0.00  50.09  10.00  0.00  0.00  500.87  1,266,526.83
5072+840.00  0.0000  19.6140  0.00  45.16  10.00  0.00  0.00  451.62  1,266,075.21
5072+860.00  0.0000  20.8840  0.00  40.50  10.00  0.00  0.00  404.98  1,265,670.23
5072+880.00  0.0000  20.1110  0.00  41.00  10.00  0.00  0.00  409.95  1,265,260.28
5072+900.00  0.2740  14.3450  0.27  34.46  10.00  2.74  3.56  344.56  1,264,919.28
5072+920.00  0.4150  10.7970  0.69  25.14  10.00  6.89  8.96  251.42  1,264,676.82
5072+940.00  0.3110  15.0220  0.73  25.82  10.00  7.26  9.44  258.19  1,264,428.07
5072+960.00  0.3730  9.6320  0.68  24.65  10.00  6.84  8.89  246.54  1,264,190.42
5072+980.00  0.0000  20.4290  0.37  30.06  10.00  3.73  4.85  300.61  1,263,894.66
5073+000.00  0.0000  29.7320  0.00  50.16  10.00  0.00  0.00  501.61  1,263,393.05

246 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

5073+020.00  0.0000  19.2120  0.00  48.94  10.00  0.00  0.00  489.44  1,262,903.61
5073+040.00  0.0000  27.9680  0.00  47.18  10.00  0.00  0.00  471.80  1,262,431.81
5073+060.00  0.0000  29.6790  0.00  57.65  10.00  0.00  0.00  576.47  1,261,855.34
5073+080.00  0.0000  24.2560  0.00  53.94  10.00  0.00  0.00  539.35  1,261,315.99
5073+100.00  0.0000  11.2710  0.00  35.53  10.00  0.00  0.00  355.27  1,260,960.72
5073+120.00  0.2490  11.2230  0.25  22.49  10.00  2.49  3.24  224.94  1,260,739.01
5073+140.00  0.0000  18.5420  0.25  29.77  10.00  2.49  3.24  297.65  1,260,444.60
5073+160.00  0.0000  15.0150  0.00  33.56  10.00  0.00  0.00  335.57  1,260,109.03
5073+180.00  0.1960  12.9100  0.20  27.93  10.00  1.96  2.55  279.25  1,259,832.33
5073+200.00  0.0000  16.6990  0.20  29.61  10.00  1.96  2.55  296.09  1,259,538.79
5073+220.00  0.3640  9.4400  0.36  26.14  10.00  3.64  4.73  261.39  1,259,282.13
5073+240.00  0.0000  13.3140  0.36  22.75  10.00  3.64  4.73  227.54  1,259,059.32
5073+260.00  0.0000  25.5920  0.00  38.91  10.00  0.00  0.00  389.06  1,258,670.26
5073+280.00  0.0000  30.1630  0.00  55.76  10.00  0.00  0.00  557.55  1,258,112.71
5073+300.00  0.0000  24.0410  0.00  54.20  10.00  0.00  0.00  542.04  1,257,570.67
5073+320.00  0.0000  22.4530  0.00  46.49  10.00  0.00  0.00  464.94  1,257,105.73
5073+340.00  0.0000  17.4390  0.00  39.89  10.00  0.00  0.00  398.92  1,256,706.81
5073+360.00  0.7870  11.6910  0.79  29.13  10.00  7.87  10.23  291.30  1,256,425.74
5073+380.00  1.1710  8.5120  1.96  20.20  10.00  19.58  25.45  202.03  1,256,249.17
5073+400.00  0.0000  18.1500  1.17  26.66  10.00  11.71  15.22  266.62  1,255,997.77
5073+420.00  0.0000  22.5580  0.00  40.71  10.00  0.00  0.00  407.08  1,255,590.69
5073+440.00  0.0000  18.0990  0.00  40.66  10.00  0.00  0.00  406.57  1,255,184.12
5073+460.00  0.0000  17.3310  0.00  35.43  10.00  0.00  0.00  354.30  1,254,829.82
5073+480.00  0.0000  23.1830  0.00  40.51  10.00  0.00  0.00  405.14  1,254,424.68
5073+500.00  0.0000  18.3820  0.00  41.57  10.00  0.00  0.00  415.65  1,254,009.03
5073+520.00  0.4730  10.7060  0.47  29.09  10.00  4.73  6.15  290.88  1,253,724.30
5073+540.00  0.3650  10.9070  0.84  21.61  10.00  8.38  10.89  216.13  1,253,519.06
5073+560.00  0.6220  8.5260  0.99  19.43  10.00  9.87  12.83  194.33  1,253,337.56
5073+580.00  0.8640  7.6440  1.49  16.17  10.00  14.86  19.32  161.70  1,253,195.18
5073+600.00  0.0000  18.4070  0.86  26.05  10.00  8.64  11.23  260.51  1,252,945.90
5073+620.00  0.0000  22.1600  0.00  40.57  10.00  0.00  0.00  405.67  1,252,540.23
5073+640.00  0.0000  20.7180  0.00  42.88  10.00  0.00  0.00  428.78  1,252,111.45
5073+660.00  0.0000  19.8150  0.00  40.53  10.00  0.00  0.00  405.33  1,251,706.12
5073+680.00  0.0000  16.4330  0.00  36.25  10.00  0.00  0.00  362.48  1,251,343.64
5073+700.00  0.0000  13.7090  0.00  30.14  10.00  0.00  0.00  301.42  1,251,042.22
5073+720.00  0.0000  11.7610  0.00  25.47  10.00  0.00  0.00  254.70  1,250,787.52
5073+740.00  0.1960  9.2280  0.20  20.99  10.00  1.96  2.55  209.89  1,250,580.18
5073+760.00  0.1720  10.6240  0.37  19.85  10.00  3.68  4.78  198.52  1,250,386.44
5073+780.00  0.0000  11.5570  0.17  22.18  10.00  1.72  2.24  221.81  1,250,166.87
5073+800.00  0.0000  16.9110  0.00  28.47  10.00  0.00  0.00  284.68  1,249,882.19
5073+815.00  0.0000  26.5930  0.00  43.50  7.50  0.00  0.00  326.28  1,249,555.91
5073+820.00  0.0000  26.6880  0.00  53.28  2.50  0.00  0.00  133.20  1,249,422.71
5073+825.00  0.0000  27.0020  0.00  53.69  2.50  0.00  0.00  134.23  1,249,288.48
5073+835.00  0.0000  26.2780  0.00  53.28  5.00  0.00  0.00  266.40  1,249,022.08
5073+840.00  0.0000  24.1650  0.00  50.44  2.50  0.00  0.00  126.11  1,248,895.98

247 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

5073+845.00  0.0000  22.0810  0.00  46.25  2.50  0.00  0.00  115.62  1,248,780.36
5073+855.00  0.0000  19.4340  0.00  41.52  5.00  0.00  0.00  207.58  1,248,572.79
5073+860.00  0.0000  19.7510  0.00  39.19  2.50  0.00  0.00  97.96  1,248,474.82
5073+865.00  0.0000  19.9790  0.00  39.73  2.50  0.00  0.00  99.33  1,248,375.50
5073+875.00  0.0000  20.3810  0.00  40.36  5.00  0.00  0.00  201.80  1,248,173.70
5073+880.00  0.0000  20.0290  0.00  40.41  2.50  0.00  0.00  101.03  1,248,072.67
5073+885.00  0.0000  19.3160  0.00  39.35  2.50  0.00  0.00  98.36  1,247,974.31
5073+895.00  0.0000  16.6850  0.00  36.00  5.00  0.00  0.00  180.01  1,247,794.31
5073+900.00  0.0000  16.1640  0.00  32.85  2.50  0.00  0.00  82.12  1,247,712.18
5073+905.00  0.0000  16.1490  0.00  32.31  2.50  0.00  0.00  80.78  1,247,631.40
5073+915.00  0.0000  17.6840  0.00  33.83  5.00  0.00  0.00  169.17  1,247,462.24
5073+920.00  0.0000  19.2100  0.00  36.89  2.50  0.00  0.00  92.24  1,247,370.00
5073+925.00  0.0000  19.1070  0.00  38.32  2.50  0.00  0.00  95.79  1,247,274.21
5073+935.00  0.0000  16.3230  0.00  35.43  5.00  0.00  0.00  177.15  1,247,097.06
5073+940.00  0.0000  13.2060  0.00  29.53  2.50  0.00  0.00  73.82  1,247,023.24
5073+945.00  0.0000  10.2120  0.00  23.42  2.50  0.00  0.00  58.55  1,246,964.69
5073+955.00  0.6400  5.6390  0.64  15.85  5.00  3.20  4.16  79.26  1,246,889.60
5073+960.00  0.7160  3.9090  1.36  9.55  2.50  3.39  4.41  23.87  1,246,870.13
5073+965.00  1.0900  3.2630  1.81  7.17  2.50  4.52  5.87  17.93  1,246,858.07
5073+975.00  1.0250  5.5840  2.12  8.85  5.00  10.58  13.75  44.24  1,246,827.58
5073+980.00  0.3920  8.2750  1.42  13.86  2.50  3.54  4.61  34.65  1,246,797.54
5073+985.32  0.0000  9.9770  0.39  18.25  2.66  1.04  1.35  48.52  1,246,750.37
5074+000.00  0.0000  12.8910  0.00  22.87  7.34  0.00  0.00  167.89  1,246,582.49
5074+005.32  0.0000  14.5190  0.00  27.41  2.66  0.00  0.00  72.87  1,246,509.62
5074+020.00  0.0000  15.3010  0.00  29.82  7.34  0.00  0.00  218.92  1,246,290.70
5074+040.00  0.0000  13.5330  0.00  28.83  10.00  0.00  0.00  288.34  1,246,002.36
5074+060.00  0.0000  17.0100  0.00  30.54  10.00  0.00  0.00  305.43  1,245,696.93
5074+080.00  0.0000  17.5490  0.00  34.56  10.00  0.00  0.00  345.59  1,245,351.34
5074+100.00  0.0000  17.9990  0.00  35.55  10.00  0.00  0.00  355.48  1,244,995.86
5074+120.00  0.0000  18.1240  0.00  36.12  10.00  0.00  0.00  361.23  1,244,634.63
5074+140.00  0.0000  23.0000  0.00  41.12  10.00  0.00  0.00  411.24  1,244,223.39
5074+160.00  0.0000  19.3160  0.00  42.32  10.00  0.00  0.00  423.16  1,243,800.23
5074+180.00  0.0000  15.9120  0.00  35.23  10.00  0.00  0.00  352.28  1,243,447.95
5074+200.00  0.0000  23.2960  0.00  39.21  10.00  0.00  0.00  392.08  1,243,055.87
5074+220.00  0.0000  17.1230  0.00  40.42  10.00  0.00  0.00  404.19  1,242,651.68
5074+240.00  0.0000  16.6740  0.00  33.80  10.00  0.00  0.00  337.97  1,242,313.71
5074+260.00  0.0000  13.9730  0.00  30.65  10.00  0.00  0.00  306.47  1,242,007.24
5074+280.00  0.0000  19.8230  0.00  33.80  10.00  0.00  0.00  337.96  1,241,669.28
5074+300.00  0.0000  18.4520  0.00  38.28  10.00  0.00  0.00  382.75  1,241,286.53
5074+320.00  0.0000  13.6210  0.00  32.07  10.00  0.00  0.00  320.73  1,240,965.80
5074+340.00  0.0000  6.7360  0.00  20.36  10.00  0.00  0.00  203.57  1,240,762.23
5074+360.00  0.9530  2.2510  0.95  8.99  10.00  9.53  12.39  89.87  1,240,684.74
5074+380.00  0.8130  3.6390  1.77  5.89  10.00  17.66  22.96  58.90  1,240,648.80
5074+400.00  1.2050  2.9880  2.02  6.63  10.00  20.18  26.23  66.27  1,240,608.77
5074+400.19  1.2200  2.9490  2.43  5.94  0.09  0.23  0.30  0.56  1,240,608.50

248 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

6000+617.91  1.2200  2.9490                    1,300,000.00


6000+620.00  1.4260  2.5480  2.65  5.50  1.04  2.76  3.59  5.74  1,299,997.85
6000+640.00  1.6120  1.9860  3.04  4.53  10.00  30.38  39.49  45.34  1,299,992.01
6000+660.00  0.4610  5.0990  2.07  7.09  10.00  20.73  26.95  70.85  1,299,948.11
6000+680.00  0.0000  6.8550  0.46  11.95  10.00  4.61  5.99  119.54  1,299,834.56
6000+700.00  0.0000  12.8100  0.00  19.67  10.00  0.00  0.00  196.65  1,299,637.91
6000+700.01  0.0000  12.8150  0.00  25.63  0.00  0.00  0.00  0.13  1,299,637.78
6000+720.00  0.0000  16.0690  0.00  28.88  10.00  0.00  0.00  288.70  1,299,349.09
6000+740.00  0.0000  10.0480  0.00  26.12  10.00  0.00  0.00  261.17  1,299,087.92
6000+760.00  0.0000  10.3710  0.00  20.42  10.00  0.00  0.00  204.19  1,298,883.73
6000+780.00  0.0000  18.3870  0.00  28.76  10.00  0.00  0.00  287.58  1,298,596.15
6000+800.00  0.0000  15.4230  0.00  33.81  10.00  0.00  0.00  338.10  1,298,258.05
6000+800.00  0.0000  11.8820  0.00  27.31  0.00  0.00  0.00  0.00  1,298,258.05
6000+820.00  0.0000  5.1060  0.00  16.99  10.00  0.00  0.00  169.88  1,298,088.17
6000+840.00  1.3660  4.1620  1.37  9.27  10.00  13.66  17.76  92.68  1,298,013.24
6000+860.00  0.0000  10.7510  1.37  14.91  10.00  13.66  17.76  149.13  1,297,881.87
6000+880.00  0.0000  12.9590  0.00  23.71  10.00  0.00  0.00  237.10  1,297,644.77
6000+880.00  0.0000  13.6380  0.00  26.60  0.00  0.00  0.00  0.00  1,297,644.77
6000+900.00  0.0000  12.0630  0.00  25.70  10.00  0.00  0.00  257.01  1,297,387.76
6000+920.00  0.0000  12.6160  0.00  24.68  10.00  0.00  0.00  246.79  1,297,140.97
6000+940.00  0.0000  14.4180  0.00  27.03  10.00  0.00  0.00  270.34  1,296,870.63
6000+960.00  0.0000  14.5990  0.00  29.02  10.00  0.00  0.00  290.17  1,296,580.46
6000+980.00  0.0000  10.4850  0.00  25.08  10.00  0.00  0.00  250.84  1,296,329.62
6001+000.00  0.5590  5.6860  0.56  16.17  10.00  5.59  7.27  161.71  1,296,175.18
6001+020.00  1.9110  0.7790  2.47  6.47  10.00  24.70  32.11  64.65  1,296,142.64
6001+040.00  0.7380  3.4980  2.65  4.28  10.00  26.49  34.44  42.77  1,296,134.31
6001+060.00  0.0000  11.0900  0.74  14.59  10.00  7.38  9.59  145.88  1,295,998.02
6001+080.00  0.0000  10.0120  0.00  21.10  10.00  0.00  0.00  211.02  1,295,787.00
6001+100.00  0.0000  10.7920  0.00  20.80  10.00  0.00  0.00  208.04  1,295,578.96
6001+120.00  0.0000  12.2380  0.00  23.03  10.00  0.00  0.00  230.30  1,295,348.66
6001+140.00  0.0000  10.6640  0.00  22.90  10.00  0.00  0.00  229.02  1,295,119.64
6001+160.00  0.0000  11.3210  0.00  21.99  10.00  0.00  0.00  219.85  1,294,899.79
6001+180.00  0.0000  12.0520  0.00  23.37  10.00  0.00  0.00  233.73  1,294,666.06
6001+200.00  0.0000  12.1210  0.00  24.17  10.00  0.00  0.00  241.73  1,294,424.33
6001+220.00  0.0000  11.4690  0.00  23.59  10.00  0.00  0.00  235.90  1,294,188.43
6001+240.00  0.0000  9.4790  0.00  20.95  10.00  0.00  0.00  209.48  1,293,978.95
6001+260.00  0.0000  9.2960  0.00  18.78  10.00  0.00  0.00  187.75  1,293,791.20
6001+280.00  0.0000  6.9300  0.00  16.23  10.00  0.00  0.00  162.26  1,293,628.94
6001+300.00  2.1170  1.3740  2.12  8.30  10.00  21.17  27.52  83.04  1,293,573.42
6001+320.00  0.0000  8.3040  2.12  9.68  10.00  21.17  27.52  96.78  1,293,504.16
6001+340.00  0.0000  11.5120  0.00  19.82  10.00  0.00  0.00  198.16  1,293,306.00
6001+360.00  0.0000  14.6170  0.00  26.13  10.00  0.00  0.00  261.29  1,293,044.71
6001+380.00  0.0000  8.4430  0.00  23.06  10.00  0.00  0.00  230.60  1,292,814.11
6001+400.00  5.3940  0.3520  5.39  8.80  10.00  53.94  70.12  87.95  1,292,796.28
6001+420.00  2.6330  1.1720  8.03  1.52  10.00  80.27  104.35  15.24  1,292,885.39

249 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

6001+440.00  0.0000  10.2170  2.63  11.39  10.00  26.33  34.23  113.89  1,292,805.73
6001+460.00  0.0000  15.5560  0.00  25.77  10.00  0.00  0.00  257.73  1,292,548.00
6001+480.00  0.0000  10.8370  0.00  26.39  10.00  0.00  0.00  263.93  1,292,284.07
6001+500.00  0.0000  9.1560  0.00  19.99  10.00  0.00  0.00  199.93  1,292,084.14
6001+520.00  0.0000  8.2600  0.00  17.42  10.00  0.00  0.00  174.16  1,291,909.98
6001+540.00  0.7150  8.3710  0.72  16.63  10.00  7.15  9.30  166.31  1,291,752.97
6001+560.00  0.0000  19.4540  0.72  27.83  10.00  7.15  9.30  278.25  1,291,484.01
6001+580.00  0.0000  25.2910  0.00  44.75  10.00  0.00  0.00  447.45  1,291,036.56
6001+600.00  0.0000  28.2400  0.00  53.53  10.00  0.00  0.00  535.31  1,290,501.25
6001+620.00  0.0000  27.4410  0.00  55.68  10.00  0.00  0.00  556.81  1,289,944.44
6001+640.00  0.0000  24.4600  0.00  51.90  10.00  0.00  0.00  519.01  1,289,425.43
6001+660.00  0.0000  23.7520  0.00  48.21  10.00  0.00  0.00  482.12  1,288,943.31
6001+680.00  0.0000  25.1930  0.00  48.95  10.00  0.00  0.00  489.45  1,288,453.86
6001+700.00  0.0000  29.1740  0.00  54.37  10.00  0.00  0.00  543.67  1,287,910.19
6001+720.00  0.0000  29.2910  0.00  58.47  10.00  0.00  0.00  584.65  1,287,325.54
6001+740.00  0.0000  27.0410  0.00  56.33  10.00  0.00  0.00  563.32  1,286,762.22
6001+760.00  0.0000  18.2280  0.00  45.27  10.00  0.00  0.00  452.69  1,286,309.53
6001+780.00  0.0000  25.7460  0.00  43.97  10.00  0.00  0.00  439.74  1,285,869.79
6001+800.00  0.0000  32.8130  0.00  58.56  10.00  0.00  0.00  585.59  1,285,284.20
6001+820.00  0.0000  36.3050  0.00  69.12  10.00  0.00  0.00  691.18  1,284,593.02
6001+840.00  0.0000  30.0000  0.00  66.31  10.00  0.00  0.00  663.05  1,283,929.97
6001+860.00  0.0000  19.0330  0.00  49.03  10.00  0.00  0.00  490.33  1,283,439.64
6001+880.00  0.0000  28.4490  0.00  47.48  10.00  0.00  0.00  474.82  1,282,964.82
6001+900.00  0.0000  31.3930  0.00  59.84  10.00  0.00  0.00  598.42  1,282,366.40
6001+920.00  0.0000  31.6980  0.00  63.09  10.00  0.00  0.00  630.91  1,281,735.49
6001+940.00  0.0000  23.6070  0.00  55.31  10.00  0.00  0.00  553.05  1,281,182.44
6001+960.00  0.0000  24.3180  0.00  47.93  10.00  0.00  0.00  479.25  1,280,703.19
6001+980.00  0.0000  19.8550  0.00  44.17  10.00  0.00  0.00  441.73  1,280,261.46
6002+000.00  0.0000  20.6620  0.00  40.52  10.00  0.00  0.00  405.17  1,279,856.29
6002+020.00  0.0000  13.1740  0.00  33.84  10.00  0.00  0.00  338.36  1,279,517.93
6002+040.00  0.0000  12.0400  0.00  25.21  10.00  0.00  0.00  252.14  1,279,265.79
6002+060.00  0.0000  16.5490  0.00  28.59  10.00  0.00  0.00  285.89  1,278,979.90
6002+080.00  0.0000  12.8850  0.00  29.43  10.00  0.00  0.00  294.34  1,278,685.56
6002+100.00  0.0000  14.0820  0.00  26.97  10.00  0.00  0.00  269.67  1,278,415.89
6002+120.00  0.0000  9.2760  0.00  23.36  10.00  0.00  0.00  233.58  1,278,182.31
6002+140.00  0.9960  2.9540  1.00  12.23  10.00  9.96  12.95  122.30  1,278,072.96
6002+160.00  0.0000  13.2930  1.00  16.25  10.00  9.96  12.95  162.47  1,277,923.44
6002+180.00  0.0000  12.8760  0.00  26.17  10.00  0.00  0.00  261.69  1,277,661.75
6002+200.00  0.0000  11.2500  0.00  24.13  10.00  0.00  0.00  241.26  1,277,420.49
6002+220.00  8.8940  0.1300  8.89  11.38  10.00  88.94  115.62  113.80  1,277,422.31
6002+240.00  8.1100  0.1160  17.00  0.25  10.00  170.04  221.05  2.46  1,277,640.90
6002+260.00  0.0000  8.5860  8.11  8.70  10.00  81.10  105.43  87.02  1,277,659.31
6002+280.00  0.0000  9.9600  0.00  18.55  10.00  0.00  0.00  185.46  1,277,473.85
6002+300.00  0.9450  3.8100  0.95  13.77  10.00  9.45  12.29  137.70  1,277,348.44
6002+320.00  0.6980  4.7840  1.64  8.59  10.00  16.43  21.36  85.94  1,277,283.86

250 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

6002+340.00  0.0000  4.2190  0.70  9.00  10.00  6.98  9.07  90.03  1,277,202.90
6002+360.00  0.0000  4.6260  0.00  8.85  10.00  0.00  0.00  88.45  1,277,114.45
6002+380.00  2.0680  3.5870  2.07  8.21  10.00  20.68  26.88  82.13  1,277,059.21
6002+400.00  0.0000  7.8230  2.07  11.41  10.00  20.68  26.88  114.10  1,276,971.99
6002+420.00  0.0000  14.2050  0.00  22.03  10.00  0.00  0.00  220.28  1,276,751.71
6002+440.00  0.0000  8.1460  0.00  22.35  10.00  0.00  0.00  223.51  1,276,528.20
6002+460.00  0.0000  11.8800  0.00  20.03  10.00  0.00  0.00  200.26  1,276,327.94
6002+480.00  0.0000  17.0720  0.00  28.95  10.00  0.00  0.00  289.52  1,276,038.42
6002+500.00  0.0000  20.9680  0.00  38.04  10.00  0.00  0.00  380.40  1,275,658.02
6002+520.00  0.0000  22.6020  0.00  43.57  10.00  0.00  0.00  435.70  1,275,222.32
6002+540.00  0.0000  19.7760  0.00  42.38  10.00  0.00  0.00  423.78  1,274,798.54
6002+560.00  0.0000  16.7460  0.00  36.52  10.00  0.00  0.00  365.22  1,274,433.32
6002+580.00  0.0000  2.7130  0.00  19.46  10.00  0.00  0.00  194.59  1,274,238.73
6002+600.00  4.3490  0.1190  4.35  2.83  10.00  43.49  56.54  28.32  1,274,266.95
6002+620.00  0.0000  3.6400  4.35  3.76  10.00  43.49  56.54  37.59  1,274,285.89
6002+640.00  0.0000  7.5510  0.00  11.19  10.00  0.00  0.00  111.91  1,274,173.98
6002+660.00  0.0000  15.6170  0.00  23.17  10.00  0.00  0.00  231.68  1,273,942.30
6002+680.00  0.0000  19.2510  0.00  34.87  10.00  0.00  0.00  348.68  1,273,593.62
6002+700.00  0.0000  15.1840  0.00  34.44  10.00  0.00  0.00  344.35  1,273,249.27
6002+720.00  0.0000  13.2570  0.00  28.44  10.00  0.00  0.00  284.41  1,272,964.86
6002+740.00  0.0000  14.5540  0.00  27.81  10.00  0.00  0.00  278.11  1,272,686.75
6002+760.00  0.0000  29.6150  0.00  44.17  10.00  0.00  0.00  441.69  1,272,245.06
6002+780.00  0.0000  39.6190  0.00  69.23  10.00  0.00  0.00  692.34  1,271,552.72
6002+800.00  0.0000  36.0680  0.00  75.69  10.00  0.00  0.00  756.87  1,270,795.85
6002+820.00  0.0000  30.0730  0.00  66.14  10.00  0.00  0.00  661.41  1,270,134.44
6002+830.00  0.0000  26.5680  0.00  56.64  5.00  0.00  0.00  283.21  1,269,851.24
6002+830.00  0.0000  26.2380  0.00  52.81  0.00  0.00  0.00  0.00  1,269,851.24
6002+840.00  0.0000  25.1160  0.00  51.35  5.00  0.00  0.00  256.77  1,269,594.47
6002+860.00  0.0000  30.7800  0.00  55.90  10.00  0.00  0.00  558.96  1,269,035.51
6002+880.00  0.0000  46.9540  0.00  77.73  10.00  0.00  0.00  777.34  1,268,258.17
6002+900.00  0.0000  52.4360  0.00  99.39  10.00  0.00  0.00  993.90  1,267,264.27
6002+920.00  0.0000  46.1800  0.00  98.62  10.00  0.00  0.00  986.16  1,266,278.11
6002+940.00  0.0000  53.4870  0.00  99.67  10.00  0.00  0.00  996.67  1,265,281.44
6002+960.00  0.0000  56.8810  0.00  110.37  10.00  0.00  0.00  1,103.68  1,264,177.76
6002+980.00  0.0000  66.9380  0.00  123.82  10.00  0.00  0.00  1,238.19  1,262,939.57
6002+980.00  0.0000  65.5870  0.00  132.53  0.00  0.00  0.00  0.00  1,262,939.57
6003+000.00  0.0000  82.4310  0.00  148.02  10.00  0.00  0.00  1,480.18  1,261,459.39
6003+020.00  0.0000  85.6110  0.00  168.04  10.00  0.00  0.00  1,680.42  1,259,778.97
6003+040.00  0.0000  83.3580  0.00  168.97  10.00  0.00  0.00  1,689.69  1,258,089.28
6003+060.00  0.0000  85.9220  0.00  169.28  10.00  0.00  0.00  1,692.80  1,256,396.48
6003+080.00  0.0000  92.3740  0.00  178.30  10.00  0.00  0.00  1,782.96  1,254,613.52
6003+100.00  0.0000  88.0510  0.00  180.43  10.00  0.00  0.00  1,804.25  1,252,809.27
6003+120.00  0.0000  93.3160  0.00  181.37  10.00  0.00  0.00  1,813.67  1,250,995.60
6003+140.00  0.0000  118.7060  0.00  212.02  10.00  0.00  0.00  2,120.22  1,248,875.38
6003+160.00  0.0000  131.7280  0.00  250.43  10.00  0.00  0.00  2,504.34  1,246,371.04

251 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

6003+180.00  0.0000  138.5300  0.00  270.26  10.00  0.00  0.00  2,702.58  1,243,668.46
6003+200.00  0.0000  147.9830  0.00  286.51  10.00  0.00  0.00  2,865.13  1,240,803.33
6003+220.00  0.0000  162.6560  0.00  310.64  10.00  0.00  0.00  3,106.39  1,237,696.94
6003+240.00  0.0000  172.5680  0.00  335.22  10.00  0.00  0.00  3,352.24  1,234,344.70
6003+260.00  0.0000  175.8010  0.00  348.37  10.00  0.00  0.00  3,483.69  1,230,861.01
6003+280.00  0.0000  169.8310  0.00  345.63  10.00  0.00  0.00  3,456.32  1,227,404.69
6003+300.00  0.0000  172.2230  0.00  342.05  10.00  0.00  0.00  3,420.54  1,223,984.15
6003+320.00  0.0000  186.8240  0.00  359.05  10.00  0.00  0.00  3,590.47  1,220,393.68
6003+340.00  0.0000  204.1510  0.00  390.98  10.00  0.00  0.00  3,909.75  1,216,483.93
6003+360.00  0.0000  205.6240  0.00  409.78  10.00  0.00  0.00  4,097.75  1,212,386.18
6003+380.00  0.0000  202.4300  0.00  408.05  10.00  0.00  0.00  4,080.54  1,208,305.64
6003+400.00  0.0000  214.8940  0.00  417.32  10.00  0.00  0.00  4,173.24  1,204,132.40
6003+420.00  0.0000  213.6920  0.00  428.59  10.00  0.00  0.00  4,285.86  1,199,846.54
6003+440.00  0.0000  217.4200  0.00  431.11  10.00  0.00  0.00  4,311.12  1,195,535.42
6003+460.00  0.0000  196.0490  0.00  413.47  10.00  0.00  0.00  4,134.69  1,191,400.73
6003+480.00  0.0000  199.8150  0.00  395.86  10.00  0.00  0.00  3,958.64  1,187,442.09
6003+500.00  0.0000  203.5800  0.00  403.40  10.00  0.00  0.00  4,033.95  1,183,408.14
6003+520.00  0.0000  216.3160  0.00  419.90  10.00  0.00  0.00  4,198.96  1,179,209.18
6003+536.24  0.0000  215.9320  0.00  432.25  8.12  0.00  0.00  3,509.85  1,175,699.32
6003+536.24  0.0000  0.0000  0.00  215.93  0.00  0.00  0.00  0.00  1,175,699.32
6003+536.24  0.0000  0.0000  0.00  0.00  0.00  0.00  0.00  0.00  1,175,699.32
6003+540.00  0.0000  0.0000  0.00  0.00  1.88  0.00  0.00  0.00  1,175,699.32
6003+560.00  0.0000  0.0000  0.00  0.00  10.00  0.00  0.00  0.00  1,175,699.32
6003+568.24  0.0000  0.0000  0.00  0.00  4.12  0.00  0.00  0.00  1,175,699.32
6003+568.24  0.0000  0.0000  0.00  0.00  0.00  0.00  0.00  0.00  1,175,699.32
6003+568.24  0.0000  199.9440  0.00  199.94  0.00  0.00  0.00  0.00  1,175,699.32
6003+580.00  0.0000  204.8750  0.00  404.82  5.88  0.00  0.00  2,380.34  1,173,318.99
6003+600.00  0.0000  207.1120  0.00  411.99  10.00  0.00  0.00  4,119.87  1,169,199.12
6003+620.00  0.0000  229.2610  0.00  436.37  10.00  0.00  0.00  4,363.73  1,164,835.39
6003+640.00  0.0000  223.1120  0.00  452.37  10.00  0.00  0.00  4,523.73  1,160,311.66
6003+660.00  0.0000  207.7280  0.00  430.84  10.00  0.00  0.00  4,308.40  1,156,003.26
6003+680.00  0.0000  210.5410  0.00  418.27  10.00  0.00  0.00  4,182.69  1,151,820.57
6003+700.00  0.0000  202.6030  0.00  413.14  10.00  0.00  0.00  4,131.44  1,147,689.13
6003+720.00  0.0000  199.9320  0.00  402.54  10.00  0.00  0.00  4,025.35  1,143,663.78
6003+740.00  0.0000  198.3050  0.00  398.24  10.00  0.00  0.00  3,982.37  1,139,681.41
6003+760.00  0.0000  186.3820  0.00  384.69  10.00  0.00  0.00  3,846.87  1,135,834.54
6003+780.00  0.0000  176.0450  0.00  362.43  10.00  0.00  0.00  3,624.27  1,132,210.27
6003+800.00  0.0000  173.2440  0.00  349.29  10.00  0.00  0.00  3,492.89  1,128,717.38
6003+820.00  0.0000  188.6680  0.00  361.91  10.00  0.00  0.00  3,619.12  1,125,098.26
6003+840.00  0.0000  191.7460  0.00  380.41  10.00  0.00  0.00  3,804.14  1,121,294.12
6003+860.00  0.0000  177.0530  0.00  368.80  10.00  0.00  0.00  3,687.99  1,117,606.13
6003+880.00  0.0000  170.0200  0.00  347.07  10.00  0.00  0.00  3,470.73  1,114,135.40
6003+900.00  0.0000  148.3460  0.00  318.37  10.00  0.00  0.00  3,183.66  1,110,951.74
6003+900.00  0.0000  153.6650  0.00  302.01  0.00  0.00  0.00  0.00  1,110,951.74
6003+920.00  0.0000  141.7640  0.00  295.43  10.00  0.00  0.00  2,954.29  1,107,997.45

252 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

6003+940.00  0.0000  134.9770  0.00  276.74  10.00  0.00  0.00  2,767.41  1,105,230.04
6003+960.00  0.0000  122.8850  0.00  257.86  10.00  0.00  0.00  2,578.62  1,102,651.42
6003+974.92  0.0000  117.4730  0.00  240.36  7.46  0.00  0.00  1,793.31  1,100,858.11
6003+980.00  0.0000  113.3200  0.00  230.79  2.54  0.00  0.00  585.98  1,100,272.12
6004+000.00  0.0000  103.4850  0.00  216.81  10.00  0.00  0.00  2,168.05  1,098,104.07
6004+020.00  0.0000  97.1750  0.00  200.66  10.00  0.00  0.00  2,006.60  1,096,097.47
6004+040.00  0.0000  91.5790  0.00  188.75  10.00  0.00  0.00  1,887.54  1,094,209.93
6004+060.00  0.0000  95.1670  0.00  186.75  10.00  0.00  0.00  1,867.46  1,092,342.47
6004+080.00  0.0000  91.4110  0.00  186.58  10.00  0.00  0.00  1,865.78  1,090,476.69
6004+100.00  0.0000  84.0630  0.00  175.47  10.00  0.00  0.00  1,754.74  1,088,721.95
6004+120.00  0.0000  75.4990  0.00  159.56  10.00  0.00  0.00  1,595.62  1,087,126.33
6004+124.92  0.0000  74.3290  0.00  149.83  2.46  0.00  0.00  368.73  1,086,757.61
6004+140.00  0.0000  61.6460  0.00  135.98  7.54  0.00  0.00  1,025.12  1,085,732.49
6004+160.00  0.0000  56.1070  0.00  117.75  10.00  0.00  0.00  1,177.53  1,084,554.96
6004+180.00  0.0000  64.2690  0.00  120.38  10.00  0.00  0.00  1,203.76  1,083,351.20
6004+200.00  0.0000  65.9000  0.00  130.17  10.00  0.00  0.00  1,301.69  1,082,049.51
6004+220.00  0.0000  51.9120  0.00  117.81  10.00  0.00  0.00  1,178.12  1,080,871.39
6004+240.00  0.0000  33.2440  0.00  85.16  10.00  0.00  0.00  851.56  1,080,019.83
6004+260.00  0.0000  14.8090  0.00  48.05  10.00  0.00  0.00  480.53  1,079,539.30
6004+280.00  0.0000  13.9780  0.00  28.79  10.00  0.00  0.00  287.87  1,079,251.43
6004+300.00  0.0000  27.1190  0.00  41.10  10.00  0.00  0.00  410.97  1,078,840.46
6004+320.00  0.0000  14.3400  0.00  41.46  10.00  0.00  0.00  414.59  1,078,425.87
6004+340.00  0.0000  23.1300  0.00  37.47  10.00  0.00  0.00  374.70  1,078,051.17
6004+355.41  0.0000  25.3080  0.00  48.44  7.71  0.00  0.00  373.31  1,077,677.86
6004+360.00  0.0000  24.2370  0.00  49.55  2.29  0.00  0.00  113.61  1,077,564.25
6004+380.00  0.0000  10.4830  0.00  34.72  10.00  0.00  0.00  347.20  1,077,217.05
6004+400.00  0.5980  3.8590  0.60  14.34  10.00  5.98  7.77  143.42  1,077,081.41
6004+420.00  0.0000  10.7040  0.60  14.56  10.00  5.98  7.77  145.63  1,076,943.55
6004+440.00  0.0000  10.1480  0.00  20.85  10.00  0.00  0.00  208.52  1,076,735.03
6004+460.00  0.0000  13.6870  0.00  23.84  10.00  0.00  0.00  238.35  1,076,496.68
6004+480.00  0.0000  12.6200  0.00  26.31  10.00  0.00  0.00  263.07  1,076,233.61
6004+500.00  0.0000  9.1600  0.00  21.78  10.00  0.00  0.00  217.80  1,076,015.81
6004+505.41  0.0000  10.1680  0.00  19.33  2.71  0.00  0.00  52.32  1,075,963.49
6004+520.00  0.0000  10.3270  0.00  20.50  7.29  0.00  0.00  149.47  1,075,814.02
6004+540.00  1.3320  0.6510  1.33  10.98  10.00  13.32  17.32  109.78  1,075,721.56
6004+560.00  0.0000  10.2310  1.33  10.88  10.00  13.32  17.32  108.82  1,075,630.05
6004+580.00  0.0000  14.1590  0.00  24.39  10.00  0.00  0.00  243.90  1,075,386.15
6004+600.00  0.0000  8.3740  0.00  22.53  10.00  0.00  0.00  225.33  1,075,160.82
6004+615.00  0.4110  3.6290  0.41  12.00  7.50  3.08  4.01  90.02  1,075,074.81
6004+615.00  0.4690  3.1640  0.88  6.79  0.00  0.00  0.00  0.00  1,075,074.81
6004+620.00  0.7050  2.7060  1.17  5.87  2.50  2.94  3.82  14.68  1,075,063.95
6004+640.00  0.7740  4.4170  1.48  7.12  10.00  14.79  19.23  71.23  1,075,011.95
6004+660.00  0.0000  7.6750  0.77  12.09  10.00  7.74  10.06  120.92  1,074,901.09
6004+680.00  0.7740  4.6600  0.77  12.34  10.00  7.74  10.06  123.35  1,074,787.80
6004+700.00  0.5880  4.4910  1.36  9.15  10.00  13.62  17.71  91.51  1,074,714.00

253 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

6004+720.00  0.0000  9.4290  0.59  13.92  10.00  5.88  7.64  139.20  1,074,582.44
6004+740.00  0.0000  8.5610  0.00  17.99  10.00  0.00  0.00  179.90  1,074,402.54
6004+760.00  0.0000  10.8870  0.00  19.45  10.00  0.00  0.00  194.48  1,074,208.06
6004+780.00  0.0000  8.4720  0.00  19.36  10.00  0.00  0.00  193.59  1,074,014.47
6004+800.00  0.0000  8.4020  0.00  16.87  10.00  0.00  0.00  168.74  1,073,845.73
6004+820.00  0.0000  10.3730  0.00  18.78  10.00  0.00  0.00  187.75  1,073,657.98
6004+840.00  0.0000  12.3060  0.00  22.68  10.00  0.00  0.00  226.79  1,073,431.19
6004+860.00  0.0000  12.1570  0.00  24.46  10.00  0.00  0.00  244.63  1,073,186.56
6004+880.00  0.0000  8.5960  0.00  20.75  10.00  0.00  0.00  207.53  1,072,979.03
6004+900.00  0.0000  7.9110  0.00  16.51  10.00  0.00  0.00  165.07  1,072,813.96
6004+920.00  0.0000  10.2320  0.00  18.14  10.00  0.00  0.00  181.43  1,072,632.53
6004+940.00  0.0000  9.7890  0.00  20.02  10.00  0.00  0.00  200.21  1,072,432.32
6004+960.00  0.0000  10.8960  0.00  20.69  10.00  0.00  0.00  206.85  1,072,225.47
6004+980.00  0.0000  10.3070  0.00  21.20  10.00  0.00  0.00  212.03  1,072,013.44
6005+000.00  0.4450  4.8220  0.45  15.13  10.00  4.45  5.79  151.29  1,071,867.93
6005+020.00  0.5170  3.9270  0.96  8.75  10.00  9.62  12.51  87.49  1,071,792.95
6005+040.00  0.0000  4.1370  0.52  8.06  10.00  5.17  6.72  80.64  1,071,719.03
6005+060.00  0.3830  6.3670  0.38  10.50  10.00  3.83  4.98  105.04  1,071,618.97
6005+080.00  0.0000  9.5310  0.38  15.90  10.00  3.83  4.98  158.98  1,071,464.97
6005+100.00  0.0000  6.7230  0.00  16.25  10.00  0.00  0.00  162.54  1,071,302.43
6005+104.49  0.0000  5.8840  0.00  12.61  2.24  0.00  0.00  28.30  1,071,274.13
6005+120.00  0.0000  7.9010  0.00  13.79  7.76  0.00  0.00  106.91  1,071,167.22
6005+140.00  0.0000  9.4310  0.00  17.33  10.00  0.00  0.00  173.32  1,070,993.90
6005+160.00  0.4320  5.6460  0.43  15.08  10.00  4.32  5.62  150.77  1,070,848.75
6005+180.00  0.4880  4.0140  0.92  9.66  10.00  9.20  11.96  96.60  1,070,764.11
6005+200.00  0.0000  7.0890  0.49  11.10  10.00  4.88  6.34  111.03  1,070,659.42
6005+220.00  0.0000  9.5550  0.00  16.64  10.00  0.00  0.00  166.44  1,070,492.98
6005+240.00  0.0000  12.8180  0.00  22.37  10.00  0.00  0.00  223.73  1,070,269.25
6005+254.49  0.0000  14.6630  0.00  27.48  7.24  0.00  0.00  199.09  1,070,070.17
6005+260.00  0.0000  13.2110  0.00  27.87  2.76  0.00  0.00  76.81  1,069,993.36
6005+280.00  0.0000  11.4600  0.00  24.67  10.00  0.00  0.00  246.71  1,069,746.65
6005+300.00  0.0000  15.7580  0.00  27.22  10.00  0.00  0.00  272.18  1,069,474.47
6005+320.00  0.0000  14.9070  0.00  30.67  10.00  0.00  0.00  306.65  1,069,167.82
6005+340.00  0.3990  5.8220  0.40  20.73  10.00  3.99  5.19  207.29  1,068,965.72
6005+360.00  0.4990  5.1540  0.90  10.98  10.00  8.98  11.67  109.76  1,068,867.63
6005+361.69  0.0000  6.1460  0.50  11.30  0.85  0.42  0.55  9.57  1,068,858.62
6005+380.00  0.0000  12.8880  0.00  19.03  9.15  0.00  0.00  174.23  1,068,684.39
6005+400.00  0.0000  13.2810  0.00  26.17  10.00  0.00  0.00  261.69  1,068,422.70
6005+420.00  0.0000  11.1480  0.00  24.43  10.00  0.00  0.00  244.29  1,068,178.41
6005+440.00  0.0000  9.2450  0.00  20.39  10.00  0.00  0.00  203.93  1,067,974.48
6005+460.00  0.0000  8.2950  0.00  17.54  10.00  0.00  0.00  175.40  1,067,799.08
6005+480.00  0.0000  9.7440  0.00  18.04  10.00  0.00  0.00  180.39  1,067,618.69
6005+500.00  0.0000  13.2070  0.00  22.95  10.00  0.00  0.00  229.51  1,067,389.18
6005+511.69  0.0000  13.7900  0.00  27.00  5.85  0.00  0.00  157.84  1,067,231.34
6005+520.00  0.0000  13.8830  0.00  27.67  4.15  0.00  0.00  114.94  1,067,116.40

254 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM.  5071+500 AL 6006+000.00  

6005+540.00  0.0000  11.3010  0.00  25.18  10.00  0.00  0.00  251.84  1,066,864.56
6005+560.00  0.0000  9.6930  0.00  20.99  10.00  0.00  0.00  209.94  1,066,654.62
6005+580.00  0.0000  11.7830  0.00  21.48  10.00  0.00  0.00  214.76  1,066,439.86
6005+600.00  0.0000  15.8820  0.00  27.67  10.00  0.00  0.00  276.65  1,066,163.21
6005+620.00  0.0000  13.6720  0.00  29.55  10.00  0.00  0.00  295.54  1,065,867.67
6005+640.00  0.0000  8.2980  0.00  21.97  10.00  0.00  0.00  219.70  1,065,647.97
6005+660.00  0.0000  15.2750  0.00  23.57  10.00  0.00  0.00  235.73  1,065,412.24
6005+680.00  0.0000  15.1280  0.00  30.40  10.00  0.00  0.00  304.03  1,065,108.21
6005+700.00  0.0000  13.6740  0.00  28.80  10.00  0.00  0.00  288.02  1,064,820.19
6005+720.00  0.0000  9.9690  0.00  23.64  10.00  0.00  0.00  236.43  1,064,583.76
6005+740.00  0.9650  2.8270  0.97  12.80  10.00  9.65  12.55  127.96  1,064,468.34
6005+760.00  0.8960  2.4690  1.86  5.30  10.00  18.61  24.19  52.96  1,064,439.58
6005+780.00  0.5910  5.4010  1.49  7.87  10.00  14.87  19.33  78.70  1,064,380.21
6005+800.00  0.5190  8.7070  1.11  14.11  10.00  11.10  14.43  141.08  1,064,253.56
6005+820.00  0.7460  7.1830  1.27  15.89  10.00  12.65  16.45  158.90  1,064,111.10
6005+840.00  1.2150  3.4310  1.96  10.61  10.00  19.61  25.49  106.14  1,064,030.46
6005+860.00  0.0000  6.6390  1.22  10.07  10.00  12.15  15.80  100.70  1,063,945.55
6005+880.00  0.0000  15.5980  0.00  22.24  10.00  0.00  0.00  222.37  1,063,723.18
6005+900.00  0.0000  15.9290  0.00  31.53  10.00  0.00  0.00  315.27  1,063,407.91
6005+920.00  0.0000  13.9650  0.00  29.89  10.00  0.00  0.00  298.94  1,063,108.97
6005+940.00  0.8690  2.8010  0.87  16.77  10.00  8.69  11.30  167.66  1,062,952.61
6005+960.00  7.2690  0.5790  8.14  3.38  10.00  81.38  105.79  33.80  1,063,024.60
6005+980.00  0.3430  10.3890  7.61  10.97  10.00  76.12  98.96  109.68  1,063,013.88
6006+000.00  0.0000  11.0360  0.34  21.43  10.00  3.43  4.46  214.25  1,062,804.09
 

TABLA 27 CÁLCULO DE CURVA MASA DEL TRAMO DEL 6017+000 AL 6030+000 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6017+000.00  0.0000  92.5140                    1,300,000.00


6017+020.00  0.0000  102.5180  0.00  195.03  10.00  0.00  0.00  1,950.32  1,298,049.68
6017+027.24  0.0000  102.2080  0.00  204.73  3.62  0.00  0.00  741.01  1,297,308.67
6017+040.00  0.0000  102.6650  0.00  204.87  6.38  0.00  0.00  1,307.19  1,296,001.48
6017+060.00  0.0000  105.4640  0.00  208.13  10.00  0.00  0.00  2,081.29  1,293,920.19
6017+080.00  0.0000  108.6900  0.00  214.15  10.00  0.00  0.00  2,141.54  1,291,778.65
6017+100.00  0.0000  114.6820  0.00  223.37  10.00  0.00  0.00  2,233.72  1,289,544.93
6017+120.00  0.0000  104.8350  0.00  219.52  10.00  0.00  0.00  2,195.17  1,287,349.76
6017+140.00  0.0000  116.8970  0.00  221.73  10.00  0.00  0.00  2,217.32  1,285,132.44
6017+160.00  0.0000  116.0300  0.00  232.93  10.00  0.00  0.00  2,329.27  1,282,803.17
6017+180.00  0.0000  109.9230  0.00  225.95  10.00  0.00  0.00  2,259.53  1,280,543.64
6017+200.00  0.0000  93.7710  0.00  203.69  10.00  0.00  0.00  2,036.94  1,278,506.70

255 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6017+220.00  0.0000  103.9260  0.00  197.70  10.00  0.00  0.00  1,976.97  1,276,529.73
6017+240.00  0.0000  126.9090  0.00  230.84  10.00  0.00  0.00  2,308.35  1,274,221.38
6017+260.00  0.0000  136.2950  0.00  263.20  10.00  0.00  0.00  2,632.04  1,271,589.34
6017+280.00  0.0000  135.5900  0.00  271.89  10.00  0.00  0.00  2,718.85  1,268,870.49
6017+300.00  0.0000  167.7680  0.00  303.36  10.00  0.00  0.00  3,033.58  1,265,836.91
6017+320.00  0.0000  192.1060  0.00  359.87  10.00  0.00  0.00  3,598.74  1,262,238.17
6017+340.00  0.0000  203.7660  0.00  395.87  10.00  0.00  0.00  3,958.72  1,258,279.45
6017+360.00  0.0000  216.1980  0.00  419.96  10.00  0.00  0.00  4,199.64  1,254,079.81
6017+380.00  0.0000  207.2560  0.00  423.45  10.00  0.00  0.00  4,234.54  1,249,845.27
6017+400.00  0.0000  182.4970  0.00  389.75  10.00  0.00  0.00  3,897.53  1,245,947.74
6017+420.00  0.0000  220.1490  0.00  402.65  10.00  0.00  0.00  4,026.46  1,241,921.28
6017+440.00  0.0000  237.6310  0.00  457.78  10.00  0.00  0.00  4,577.80  1,237,343.48
6017+460.00  0.0000  212.7670  0.00  450.40  10.00  0.00  0.00  4,503.98  1,232,839.50
6017+480.00  0.0000  201.9600  0.00  414.73  10.00  0.00  0.00  4,147.27  1,228,692.23
6017+500.00  0.0000  244.4530  0.00  446.41  10.00  0.00  0.00  4,464.13  1,224,228.10
6017+520.00  0.0000  245.4420  0.00  489.90  10.00  0.00  0.00  4,898.95  1,219,329.15
6017+540.00  0.0000  262.5590  0.00  508.00  10.00  0.00  0.00  5,080.01  1,214,249.14
6017+560.00  0.0000  264.3190  0.00  526.88  10.00  0.00  0.00  5,268.78  1,208,980.36
6017+579.55  0.0000  270.9720  0.00  535.29  9.78  0.00  0.00  5,233.27  1,203,747.09
6017+580.00  0.0000  270.9140  0.00  541.89  0.22  0.00  0.00  121.11  1,203,625.98
6017+600.00  0.0000  264.4060  0.00  535.32  10.00  0.00  0.00  5,353.20  1,198,272.78
6017+606.68  0.0000  249.6630  0.00  514.07  3.34  0.00  0.00  1,717.50  1,196,555.27
6017+606.68  0.0000  0.0000  0.00  249.66  0.00  0.00  0.00  0.00  1,196,555.27
6017+606.68  0.0000  0.0000  0.00  0.00  0.00  0.00  0.00  0.00  1,196,555.27
6017+620.00  0.0000  0.0000  0.00  0.00  6.66  0.00  0.00  0.00  1,196,555.27
6017+640.00  0.0000  0.0000  0.00  0.00  10.00  0.00  0.00  0.00  1,196,555.27
6017+660.00  0.0000  0.0000  0.00  0.00  10.00  0.00  0.00  0.00  1,196,555.27
6017+670.68  0.0000  0.0000  0.00  0.00  5.34  0.00  0.00  0.00  1,196,555.27
6017+670.68  0.0000  0.0000  0.00  0.00  0.00  0.00  0.00  0.00  1,196,555.27
6017+670.68  0.0000  245.8970  0.00  245.90  0.00  0.00  0.00  0.00  1,196,555.27
6017+680.00  0.0000  249.8420  0.00  495.74  4.66  0.00  0.00  2,309.65  1,194,245.63
6017+700.00  0.0000  239.9860  0.00  489.83  10.00  0.00  0.00  4,898.28  1,189,347.35
6017+720.00  0.0000  239.6410  0.00  479.63  10.00  0.00  0.00  4,796.27  1,184,551.08
6017+729.55  0.0000  249.6130  0.00  489.25  4.78  0.00  0.00  2,336.92  1,182,214.15
6017+740.00  0.0000  256.7890  0.00  506.40  5.22  0.00  0.00  2,645.19  1,179,568.96
6017+760.00  0.0000  255.1160  0.00  511.91  10.00  0.00  0.00  5,119.05  1,174,449.91
6017+780.00  0.0000  249.1410  0.00  504.26  10.00  0.00  0.00  5,042.57  1,169,407.34
6017+800.00  0.0000  241.4590  0.00  490.60  10.00  0.00  0.00  4,906.00  1,164,501.34
6017+820.00  0.0000  230.2960  0.00  471.76  10.00  0.00  0.00  4,717.55  1,159,783.79
6017+840.00  0.0000  215.7380  0.00  446.03  10.00  0.00  0.00  4,460.34  1,155,323.45
6017+860.00  0.0000  223.0310  0.00  438.77  10.00  0.00  0.00  4,387.69  1,150,935.76
6017+880.00  0.0000  229.4310  0.00  452.46  10.00  0.00  0.00  4,524.62  1,146,411.14
6017+900.00  0.0000  224.8500  0.00  454.28  10.00  0.00  0.00  4,542.81  1,141,868.33
6017+902.74  0.0000  224.2190  0.00  449.07  1.37  0.00  0.00  615.67  1,141,252.66
6017+920.00  0.0000  217.5840  0.00  441.80  8.63  0.00  0.00  3,812.32  1,137,440.34

256 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6017+940.00  0.0000  208.7380  0.00  426.32  10.00  0.00  0.00  4,263.22  1,133,177.12
6017+960.00  0.0000  207.9430  0.00  416.68  10.00  0.00  0.00  4,166.81  1,129,010.31
6017+980.00  0.0000  195.1810  0.00  403.12  10.00  0.00  0.00  4,031.24  1,124,979.07
6018+000.00  0.0000  182.3480  0.00  377.53  10.00  0.00  0.00  3,775.29  1,121,203.78
6018+020.00  0.0000  178.7030  0.00  361.05  10.00  0.00  0.00  3,610.51  1,117,593.27
6018+040.00  0.0000  164.5970  0.00  343.30  10.00  0.00  0.00  3,433.00  1,114,160.27
6018+052.74  0.0000  159.2340  0.00  323.83  6.37  0.00  0.00  2,063.29  1,112,096.98
6018+060.00  0.0000  155.6160  0.00  314.85  3.63  0.00  0.00  1,142.43  1,110,954.55
6018+080.00  0.0000  144.0570  0.00  299.67  10.00  0.00  0.00  2,996.73  1,107,957.82
6018+100.00  0.0000  144.6500  0.00  288.71  10.00  0.00  0.00  2,887.07  1,105,070.75
6018+120.00  0.0000  127.4580  0.00  272.11  10.00  0.00  0.00  2,721.08  1,102,349.67
6018+140.00  0.0000  128.6420  0.00  256.10  10.00  0.00  0.00  2,561.00  1,099,788.67
6018+160.00  0.0000  117.4620  0.00  246.10  10.00  0.00  0.00  2,461.04  1,097,327.63
6018+180.00  0.0000  111.4280  0.00  228.89  10.00  0.00  0.00  2,288.90  1,095,038.73
6018+200.00  0.0000  97.5990  0.00  209.03  10.00  0.00  0.00  2,090.27  1,092,948.46
6018+220.00  0.0000  90.3840  0.00  187.98  10.00  0.00  0.00  1,879.83  1,091,068.63
6018+240.00  0.0000  82.2900  0.00  172.67  10.00  0.00  0.00  1,726.74  1,089,341.89
6018+250.00  0.0000  85.3440  0.00  167.63  5.00  0.00  0.00  838.17  1,088,503.72
6018+250.00  0.0000  85.3450  0.00  170.69  0.00  0.00  0.00  0.09  1,088,503.63
6018+260.00  0.0000  83.7100  0.00  169.06  5.00  0.00  0.00  845.19  1,087,658.44
6018+280.00  0.0000  68.9460  0.00  152.66  10.00  0.00  0.00  1,526.56  1,086,131.88
6018+300.00  0.0000  61.9660  0.00  130.91  10.00  0.00  0.00  1,309.12  1,084,822.76
6018+320.00  0.0000  51.1200  0.00  113.09  10.00  0.00  0.00  1,130.86  1,083,691.90
6018+340.00  0.0000  48.3590  0.00  99.48  10.00  0.00  0.00  994.79  1,082,697.11
6018+360.00  0.0000  51.3250  0.00  99.68  10.00  0.00  0.00  996.84  1,081,700.27
6018+380.00  0.0000  50.7860  0.00  102.11  10.00  0.00  0.00  1,021.11  1,080,679.16
6018+400.00  0.0000  47.6840  0.00  98.47  10.00  0.00  0.00  984.70  1,079,694.46
6018+420.00  0.0000  44.9740  0.00  92.66  10.00  0.00  0.00  926.58  1,078,767.88
6018+440.00  0.0000  38.5770  0.00  83.55  10.00  0.00  0.00  835.51  1,077,932.37
6018+460.00  0.0000  33.1120  0.00  71.69  10.00  0.00  0.00  716.89  1,077,215.48
6018+480.00  0.0000  26.0270  0.00  59.14  10.00  0.00  0.00  591.39  1,076,624.09
6018+500.00  0.0000  27.7920  0.00  53.82  10.00  0.00  0.00  538.19  1,076,085.90
6018+520.00  0.0000  31.8420  0.00  59.63  10.00  0.00  0.00  596.34  1,075,489.56
6018+540.00  0.0000  29.6520  0.00  61.49  10.00  0.00  0.00  614.94  1,074,874.62
6018+560.00  0.0000  21.9980  0.00  51.65  10.00  0.00  0.00  516.50  1,074,358.12
6018+580.00  0.0000  18.1360  0.00  40.13  10.00  0.00  0.00  401.34  1,073,956.78
6018+600.00  0.0000  19.2840  0.00  37.42  10.00  0.00  0.00  374.20  1,073,582.58
6018+620.00  0.0000  20.4120  0.00  39.70  10.00  0.00  0.00  396.96  1,073,185.62
6018+640.00  0.0000  16.4620  0.00  36.87  10.00  0.00  0.00  368.74  1,072,816.88
6018+660.00  0.0000  15.6250  0.00  32.09  10.00  0.00  0.00  320.87  1,072,496.01
6018+680.00  0.0000  12.7060  0.00  28.33  10.00  0.00  0.00  283.31  1,072,212.70
6018+700.00  0.0000  18.3990  0.00  31.11  10.00  0.00  0.00  311.05  1,071,901.65
6018+720.00  0.0000  19.7230  0.00  38.12  10.00  0.00  0.00  381.22  1,071,520.43
6018+727.00  0.0000  17.9190  0.00  37.64  3.50  0.00  0.00  131.75  1,071,388.69
6018+740.00  0.0000  16.6790  0.00  34.60  6.50  0.00  0.00  224.89  1,071,163.80

257 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6018+747.00  0.0000  16.9900  0.00  33.67  3.50  0.00  0.00  117.84  1,071,045.96
6018+757.00  0.0000  16.9340  0.00  33.92  5.00  0.00  0.00  169.62  1,070,876.34
6018+760.00  0.0000  17.5950  0.00  34.53  1.50  0.00  0.00  51.79  1,070,824.54
6018+767.00  0.0000  19.5490  0.00  37.14  3.50  0.00  0.00  130.00  1,070,694.54
6018+777.00  0.0000  22.4920  0.00  42.04  5.00  0.00  0.00  210.21  1,070,484.34
6018+780.00  0.0000  20.7440  0.00  43.24  1.50  0.00  0.00  64.85  1,070,419.48
6018+787.00  0.0000  16.5480  0.00  37.29  3.50  0.00  0.00  130.52  1,070,288.96
6018+797.00  0.0000  11.6140  0.00  28.16  5.00  0.00  0.00  140.81  1,070,148.15
6018+800.00  0.0000  12.7020  0.00  24.32  1.50  0.00  0.00  36.47  1,070,111.68
6018+807.00  0.0000  15.4740  0.00  28.18  3.50  0.00  0.00  98.62  1,070,013.06
6018+817.00  0.0000  19.7500  0.00  35.22  5.00  0.00  0.00  176.12  1,069,836.94
6018+820.00  0.0000  20.1880  0.00  39.94  1.50  0.00  0.00  59.91  1,069,777.03
6018+827.00  0.0000  21.1980  0.00  41.39  3.50  0.00  0.00  144.85  1,069,632.18
6018+837.00  0.0000  22.2040  0.00  43.40  5.00  0.00  0.00  217.01  1,069,415.17
6018+840.00  0.0000  21.8170  0.00  44.02  1.50  0.00  0.00  66.03  1,069,349.14
6018+847.00  0.0000  20.6220  0.00  42.44  3.50  0.00  0.00  148.54  1,069,200.60
6018+857.00  0.0000  17.9170  0.00  38.54  5.00  0.00  0.00  192.70  1,069,007.91
6018+860.00  0.0000  16.9310  0.00  34.85  1.50  0.00  0.00  52.27  1,068,955.64
6018+867.00  0.4990  14.8600  0.50  31.79  3.50  1.75  2.27  111.27  1,068,846.64
6018+880.00  0.6620  12.4490  1.16  27.31  6.50  7.55  9.81  177.51  1,068,678.94
6018+900.00  0.0000  15.3360  0.66  27.79  10.00  6.62  8.61  277.85  1,068,409.70
6018+920.00  1.1380  6.3890  1.14  21.73  10.00  11.38  14.79  217.25  1,068,207.24
6018+940.00  5.3100  0.2410  6.45  6.63  10.00  64.48  83.82  66.30  1,068,224.76
6018+960.00  7.1060  0.2400  12.42  0.48  10.00  124.16  161.41  4.81  1,068,381.36
6018+980.00  1.0190  6.5070  8.13  6.75  10.00  81.25  105.63  67.47  1,068,419.52
6019+000.00  0.0000  6.9970  1.02  13.50  10.00  10.19  13.25  135.04  1,068,297.72
6019+020.00  0.0000  13.9790  0.00  20.98  10.00  0.00  0.00  209.76  1,068,087.96
6019+040.00  0.0000  14.2020  0.00  28.18  10.00  0.00  0.00  281.81  1,067,806.15
6019+060.00  0.0000  22.3530  0.00  36.56  10.00  0.00  0.00  365.55  1,067,440.60
6019+070.00  0.0000  23.9730  0.00  46.33  5.00  0.00  0.00  231.63  1,067,208.97
6019+070.00  0.0000  21.8850  0.00  45.86  0.00  0.00  0.00  0.00  1,067,208.97
6019+080.00  0.0000  21.9090  0.00  43.79  5.00  0.00  0.00  218.97  1,066,990.00
6019+100.00  0.0000  18.3340  0.00  40.24  10.00  0.00  0.00  402.43  1,066,587.57
6019+120.00  0.0000  26.4460  0.00  44.78  10.00  0.00  0.00  447.80  1,066,139.77
6019+140.00  0.0000  29.7420  0.00  56.19  10.00  0.00  0.00  561.88  1,065,577.89
6019+160.00  0.0000  31.5600  0.00  61.30  10.00  0.00  0.00  613.02  1,064,964.87
6019+160.00  0.0000  33.6030  0.00  65.16  0.00  0.00  0.00  0.00  1,064,964.87
6019+180.00  0.0000  26.4490  0.00  60.05  10.00  0.00  0.00  600.52  1,064,364.35
6019+200.00  6.8150  0.2220  6.82  26.67  10.00  68.15  88.60  266.71  1,064,186.24
6019+220.00  9.5370  0.2140  16.35  0.44  10.00  163.52  212.58  4.36  1,064,394.45
6019+240.00  0.0000  12.8710  9.54  13.09  10.00  95.37  123.98  130.85  1,064,387.59
6019+247.00  0.0000  15.6670  0.00  28.54  3.50  0.00  0.00  99.88  1,064,287.70
6019+257.00  0.0000  19.7290  0.00  35.40  5.00  0.00  0.00  176.98  1,064,110.72
6019+260.00  0.0000  21.1440  0.00  40.87  1.50  0.00  0.00  61.31  1,064,049.41
6019+267.00  0.0000  23.6400  0.00  44.78  3.50  0.00  0.00  156.74  1,063,892.67

258 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6019+277.00  0.0000  23.2830  0.00  46.92  5.00  0.00  0.00  234.62  1,063,658.05
6019+280.00  0.0000  23.2850  0.00  46.57  1.50  0.00  0.00  69.85  1,063,588.20
6019+287.00  0.0000  23.2100  0.00  46.50  3.50  0.00  0.00  162.73  1,063,425.47
6019+297.00  0.0000  22.4450  0.00  45.66  5.00  0.00  0.00  228.28  1,063,197.19
6019+300.00  0.0000  21.6740  0.00  44.12  1.50  0.00  0.00  66.18  1,063,131.02
6019+307.00  0.0000  19.7530  0.00  41.43  3.50  0.00  0.00  144.99  1,062,986.02
6019+317.00  0.0000  17.3170  0.00  37.07  5.00  0.00  0.00  185.35  1,062,800.67
6019+320.00  0.0000  18.1450  0.00  35.46  1.50  0.00  0.00  53.19  1,062,747.48
6019+327.00  0.0000  19.8940  0.00  38.04  3.50  0.00  0.00  133.14  1,062,614.34
6019+337.00  0.0000  21.8730  0.00  41.77  5.00  0.00  0.00  208.84  1,062,405.51
6019+340.00  0.0000  21.8480  0.00  43.72  1.50  0.00  0.00  65.58  1,062,339.93
6019+347.00  0.0000  21.6800  0.00  43.53  3.50  0.00  0.00  152.35  1,062,187.58
6019+357.00  0.0000  21.6310  0.00  43.31  5.00  0.00  0.00  216.56  1,061,971.02
6019+360.00  0.0000  22.2620  0.00  43.89  1.50  0.00  0.00  65.84  1,061,905.18
6019+366.83  0.0000  23.7820  0.00  46.04  3.42  0.00  0.00  157.31  1,061,747.87
6019+380.00  0.0000  25.8240  0.00  49.61  6.58  0.00  0.00  326.58  1,061,421.29
6019+386.83  0.0000  26.2160  0.00  52.04  3.42  0.00  0.00  177.79  1,061,243.50
6019+400.00  0.0000  26.3320  0.00  52.55  6.58  0.00  0.00  345.95  1,060,897.55
6019+420.00  0.0000  23.8240  0.00  50.16  10.00  0.00  0.00  501.56  1,060,395.99
6019+440.00  0.0000  16.5750  0.00  40.40  10.00  0.00  0.00  403.99  1,059,992.00
6019+460.00  0.0000  16.0370  0.00  32.61  10.00  0.00  0.00  326.12  1,059,665.88
6019+480.00  0.0000  9.4250  0.00  25.46  10.00  0.00  0.00  254.62  1,059,411.26
6019+500.00  0.0000  15.7860  0.00  25.21  10.00  0.00  0.00  252.11  1,059,159.15
6019+520.00  0.0000  21.4550  0.00  37.24  10.00  0.00  0.00  372.41  1,058,786.74
6019+540.00  0.0000  22.6850  0.00  44.14  10.00  0.00  0.00  441.40  1,058,345.34
6019+560.00  0.0000  21.6610  0.00  44.35  10.00  0.00  0.00  443.46  1,057,901.88
6019+570.00  0.0000  18.2220  0.00  39.88  5.00  0.00  0.00  199.42  1,057,702.46
6019+580.00  0.0000  15.8050  0.00  34.03  5.00  0.00  0.00  170.14  1,057,532.33
6019+590.00  0.0000  15.4480  0.00  31.25  5.00  0.00  0.00  156.27  1,057,376.06
6019+600.00  0.0000  15.5750  0.00  31.02  5.00  0.00  0.00  155.12  1,057,220.95
6019+610.00  0.0000  14.4200  0.00  30.00  5.00  0.00  0.00  149.98  1,057,070.97
6019+620.00  0.0000  14.7360  0.00  29.16  5.00  0.00  0.00  145.78  1,056,925.19
6019+630.00  0.0000  17.8540  0.00  32.59  5.00  0.00  0.00  162.95  1,056,762.24
6019+640.00  0.0000  21.5460  0.00  39.40  5.00  0.00  0.00  197.00  1,056,565.24
6019+650.00  0.0000  25.3210  0.00  46.87  5.00  0.00  0.00  234.34  1,056,330.91
6019+660.00  0.0000  27.9000  0.00  53.22  5.00  0.00  0.00  266.11  1,056,064.80
6019+670.00  0.0000  28.8320  0.00  56.73  5.00  0.00  0.00  283.66  1,055,781.14
6019+680.00  0.0000  28.2020  0.00  57.03  5.00  0.00  0.00  285.17  1,055,495.97
6019+690.00  0.0000  24.4450  0.00  52.65  5.00  0.00  0.00  263.24  1,055,232.74
6019+700.00  0.0000  22.6900  0.00  47.14  5.00  0.00  0.00  235.68  1,054,997.06
6019+710.00  0.0000  24.5980  0.00  47.29  5.00  0.00  0.00  236.44  1,054,760.62
6019+720.00  0.0000  25.8720  0.00  50.47  5.00  0.00  0.00  252.35  1,054,508.27
6019+730.00  0.0000  25.9420  0.00  51.81  5.00  0.00  0.00  259.07  1,054,249.20
6019+740.00  0.0000  22.7820  0.00  48.72  5.00  0.00  0.00  243.62  1,054,005.58
6019+750.00  0.0000  14.0370  0.00  36.82  5.00  0.00  0.00  184.10  1,053,821.49

259 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6019+760.00  0.3390  6.5520  0.34  20.59  5.00  1.70  2.20  102.95  1,053,720.75
6019+770.00  1.5150  1.3260  1.85  7.88  5.00  9.27  12.05  39.39  1,053,693.41
6019+780.00  1.5010  3.2030  3.02  4.53  5.00  15.08  19.60  22.65  1,053,690.37
6019+800.00  0.0000  23.9430  1.50  27.15  10.00  15.01  19.51  271.46  1,053,438.42
6019+820.00  0.0000  32.3080  0.00  56.25  10.00  0.00  0.00  562.51  1,052,875.91
6019+840.00  0.0000  29.3070  0.00  61.62  10.00  0.00  0.00  616.15  1,052,259.76
6019+860.00  0.0000  32.2450  0.00  61.55  10.00  0.00  0.00  615.52  1,051,644.24
6019+880.00  0.0000  30.7510  0.00  63.00  10.00  0.00  0.00  629.96  1,051,014.28
6019+900.00  0.0000  24.3220  0.00  55.07  10.00  0.00  0.00  550.73  1,050,463.55
6019+920.00  0.0000  30.9230  0.00  55.25  10.00  0.00  0.00  552.45  1,049,911.10
6019+940.00  0.0000  33.7010  0.00  64.62  10.00  0.00  0.00  646.24  1,049,264.86
6019+960.00  0.0000  28.5140  0.00  62.22  10.00  0.00  0.00  622.15  1,048,642.71
6019+980.00  0.0000  26.0240  0.00  54.54  10.00  0.00  0.00  545.38  1,048,097.33
6020+000.00  0.0000  32.3550  0.00  58.38  10.00  0.00  0.00  583.79  1,047,513.54
6020+020.00  0.0000  25.8860  0.00  58.24  10.00  0.00  0.00  582.41  1,046,931.13
6020+040.00  0.0000  11.0870  0.00  36.97  10.00  0.00  0.00  369.73  1,046,561.40
6020+060.00  2.7910  2.4150  2.79  13.50  10.00  27.91  36.28  135.02  1,046,462.66
6020+080.00  0.5060  10.1460  3.30  12.56  10.00  32.97  42.86  125.61  1,046,379.91
6020+100.00  0.0000  15.8620  0.51  26.01  10.00  5.06  6.58  260.08  1,046,126.41
6020+120.00  0.0000  23.4420  0.00  39.30  10.00  0.00  0.00  393.04  1,045,733.37
6020+140.00  0.0000  31.0640  0.00  54.51  10.00  0.00  0.00  545.06  1,045,188.31
6020+160.00  0.0000  33.8470  0.00  64.91  10.00  0.00  0.00  649.11  1,044,539.20
6020+180.00  0.0000  24.2580  0.00  58.11  10.00  0.00  0.00  581.05  1,043,958.15
6020+200.00  0.0000  29.0650  0.00  53.32  10.00  0.00  0.00  533.23  1,043,424.92
6020+220.00  0.0000  17.9700  0.00  47.04  10.00  0.00  0.00  470.35  1,042,954.57
6020+240.00  0.0000  25.0680  0.00  43.04  10.00  0.00  0.00  430.38  1,042,524.19
6020+260.00  0.0000  34.0590  0.00  59.13  10.00  0.00  0.00  591.27  1,041,932.92
6020+280.00  0.0000  37.7420  0.00  71.80  10.00  0.00  0.00  718.01  1,041,214.91
6020+300.00  0.0000  20.0190  0.00  57.76  10.00  0.00  0.00  577.61  1,040,637.30
6020+320.00  0.0000  14.4340  0.00  34.45  10.00  0.00  0.00  344.53  1,040,292.77
6020+340.00  0.0000  26.8820  0.00  41.32  10.00  0.00  0.00  413.16  1,039,879.61
6020+360.00  0.0000  36.4580  0.00  63.34  10.00  0.00  0.00  633.40  1,039,246.21
6020+380.00  0.0000  29.3230  0.00  65.78  10.00  0.00  0.00  657.81  1,038,588.40
6020+400.00  0.0000  38.1040  0.00  67.43  10.00  0.00  0.00  674.27  1,037,914.13
6020+420.00  0.0000  41.5100  0.00  79.61  10.00  0.00  0.00  796.14  1,037,117.99
6020+440.00  0.0000  47.6700  0.00  89.18  10.00  0.00  0.00  891.80  1,036,226.19
6020+460.00  0.0000  50.7100  0.00  98.38  10.00  0.00  0.00  983.80  1,035,242.39
6020+480.00  0.0000  30.9000  0.00  81.61  10.00  0.00  0.00  816.10  1,034,426.29
6020+500.00  0.0000  33.1950  0.00  64.10  10.00  0.00  0.00  640.95  1,033,785.34
6020+520.00  0.0000  35.1210  0.00  68.32  10.00  0.00  0.00  683.16  1,033,102.18
6020+540.00  0.0000  34.7950  0.00  69.92  10.00  0.00  0.00  699.16  1,032,403.02
6020+560.00  0.0000  38.6890  0.00  73.48  10.00  0.00  0.00  734.84  1,031,668.18
6020+580.00  0.0000  32.2390  0.00  70.93  10.00  0.00  0.00  709.28  1,030,958.90
6020+600.00  0.0000  28.9060  0.00  61.15  10.00  0.00  0.00  611.45  1,030,347.45
6020+620.00  0.0000  40.5840  0.00  69.49  10.00  0.00  0.00  694.90  1,029,652.55

260 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6020+640.00  0.0000  33.9510  0.00  74.54  10.00  0.00  0.00  745.35  1,028,907.20
6020+660.00  0.0000  23.8220  0.00  57.77  10.00  0.00  0.00  577.73  1,028,329.47
6020+680.00  0.0000  16.0510  0.00  39.87  10.00  0.00  0.00  398.73  1,027,930.74
6020+700.00  0.0000  21.9810  0.00  38.03  10.00  0.00  0.00  380.32  1,027,550.42
6020+720.00  0.0000  28.4060  0.00  50.39  10.00  0.00  0.00  503.87  1,027,046.55
6020+740.00  0.0000  30.2650  0.00  58.67  10.00  0.00  0.00  586.71  1,026,459.84
6020+760.00  0.0000  38.8740  0.00  69.14  10.00  0.00  0.00  691.39  1,025,768.45
6020+780.00  0.0000  25.8950  0.00  64.77  10.00  0.00  0.00  647.69  1,025,120.76
6020+800.00  0.0000  27.6670  0.00  53.56  10.00  0.00  0.00  535.62  1,024,585.14
6020+820.00  0.0000  31.6400  0.00  59.31  10.00  0.00  0.00  593.07  1,023,992.07
6020+840.00  0.0000  23.7800  0.00  55.42  10.00  0.00  0.00  554.20  1,023,437.87
6020+860.00  0.6620  14.0530  0.66  37.83  10.00  6.62  8.61  378.33  1,023,068.15
6020+880.00  0.0000  22.1690  0.66  36.22  10.00  6.62  8.61  362.22  1,022,714.53
6020+880.00  0.0000  21.2490  0.00  43.42  0.00  0.00  0.00  0.00  1,022,714.53
6020+900.00  0.0000  32.0190  0.00  53.27  10.00  0.00  0.00  532.68  1,022,181.85
6020+920.00  0.0000  36.2770  0.00  68.30  10.00  0.00  0.00  682.96  1,021,498.89
6020+940.00  0.0000  32.8740  0.00  69.15  10.00  0.00  0.00  691.51  1,020,807.38
6020+960.00  0.0000  33.5420  0.00  66.42  10.00  0.00  0.00  664.16  1,020,143.22
6020+980.00  0.0000  31.8590  0.00  65.40  10.00  0.00  0.00  654.01  1,019,489.21
6021+000.00  0.0000  35.1010  0.00  66.96  10.00  0.00  0.00  669.60  1,018,819.61
6021+020.00  0.0000  17.5560  0.00  52.66  10.00  0.00  0.00  526.57  1,018,293.04
6021+040.00  0.0000  6.2530  0.00  23.81  10.00  0.00  0.00  238.09  1,018,054.95
6021+060.00  9.0650  0.1840  9.07  6.44  10.00  90.65  117.85  64.37  1,018,108.43
6021+080.00  3.8180  0.6140  12.88  0.80  10.00  128.83  167.48  7.98  1,018,267.93
6021+100.00  0.0000  21.1560  3.82  21.77  10.00  38.18  49.63  217.70  1,018,099.86
6021+120.00  0.0000  24.4840  0.00  45.64  10.00  0.00  0.00  456.40  1,017,643.46
6021+140.00  0.0000  23.8030  0.00  48.29  10.00  0.00  0.00  482.87  1,017,160.59
6021+160.00  0.0000  26.7500  0.00  50.55  10.00  0.00  0.00  505.53  1,016,655.06
6021+180.00  0.0000  39.1770  0.00  65.93  10.00  0.00  0.00  659.27  1,015,995.79
6021+200.00  0.0000  32.6200  0.00  71.80  10.00  0.00  0.00  717.97  1,015,277.82
6021+220.00  0.0000  20.5760  0.00  53.20  10.00  0.00  0.00  531.96  1,014,745.86
6021+240.00  0.0000  28.3770  0.00  48.95  10.00  0.00  0.00  489.53  1,014,256.33
6021+250.00  0.0000  31.3170  0.00  59.69  5.00  0.00  0.00  298.47  1,013,957.86
6021+260.00  0.0000  32.5130  0.00  63.83  5.00  0.00  0.00  319.15  1,013,638.71
6021+270.00  0.0000  31.8780  0.00  64.39  5.00  0.00  0.00  321.96  1,013,316.76
6021+280.00  0.0000  28.3530  0.00  60.23  5.00  0.00  0.00  301.16  1,013,015.60
6021+290.00  0.0000  23.4590  0.00  51.81  5.00  0.00  0.00  259.06  1,012,756.54
6021+300.00  0.0000  25.9970  0.00  49.46  5.00  0.00  0.00  247.28  1,012,509.26
6021+310.00  0.0000  32.6930  0.00  58.69  5.00  0.00  0.00  293.45  1,012,215.81
6021+320.00  0.0000  31.5210  0.00  64.21  5.00  0.00  0.00  321.07  1,011,894.74
6021+330.00  0.0000  27.5040  0.00  59.03  5.00  0.00  0.00  295.13  1,011,599.62
6021+340.00  0.0000  19.7050  0.00  47.21  5.00  0.00  0.00  236.05  1,011,363.57
6021+350.00  0.0000  15.5890  0.00  35.29  5.00  0.00  0.00  176.47  1,011,187.10
6021+360.00  0.0000  17.8710  0.00  33.46  5.00  0.00  0.00  167.30  1,011,019.80
6021+370.00  0.0000  17.3270  0.00  35.20  5.00  0.00  0.00  175.99  1,010,843.81

261 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6021+380.00  0.0000  11.5220  0.00  28.85  5.00  0.00  0.00  144.25  1,010,699.57
6021+390.00  0.0000  11.1050  0.00  22.63  5.00  0.00  0.00  113.14  1,010,586.43
6021+400.00  0.0000  15.4190  0.00  26.52  5.00  0.00  0.00  132.62  1,010,453.81
6021+409.97  0.0000  18.1180  0.00  33.54  4.99  0.00  0.00  167.20  1,010,286.61
6021+420.00  0.0000  19.6300  0.00  37.75  5.01  0.00  0.00  189.29  1,010,097.33
6021+429.97  0.0000  18.0620  0.00  37.69  4.99  0.00  0.00  187.91  1,009,909.41
6021+440.00  0.0000  15.3680  0.00  33.43  5.01  0.00  0.00  167.63  1,009,741.78
6021+455.00  0.0000  14.0990  0.00  29.47  7.50  0.00  0.00  221.00  1,009,520.78
6021+455.00  0.0000  12.7390  0.00  26.84  0.00  0.00  0.00  0.00  1,009,520.78
6021+460.00  0.0000  12.7530  0.00  25.49  2.50  0.00  0.00  63.73  1,009,457.05
6021+480.00  0.0000  12.0950  0.00  24.85  10.00  0.00  0.00  248.48  1,009,208.57
6021+500.00  0.0000  20.3050  0.00  32.40  10.00  0.00  0.00  324.00  1,008,884.57
6021+520.00  0.0000  24.3460  0.00  44.65  10.00  0.00  0.00  446.51  1,008,438.06
6021+540.00  0.0000  21.4110  0.00  45.76  10.00  0.00  0.00  457.57  1,007,980.49
6021+560.00  0.0000  16.1850  0.00  37.60  10.00  0.00  0.00  375.96  1,007,604.53
6021+580.00  0.0000  19.1900  0.00  35.38  10.00  0.00  0.00  353.75  1,007,250.78
6021+600.00  0.0000  15.2210  0.00  34.41  10.00  0.00  0.00  344.11  1,006,906.67
6021+620.00  0.0000  19.1650  0.00  34.39  10.00  0.00  0.00  343.86  1,006,562.81
6021+640.00  0.0000  19.3570  0.00  38.52  10.00  0.00  0.00  385.22  1,006,177.59
6021+660.00  0.0000  18.6210  0.00  37.98  10.00  0.00  0.00  379.78  1,005,797.81
6021+680.00  0.0000  23.4090  0.00  42.03  10.00  0.00  0.00  420.30  1,005,377.51
6021+700.00  0.0000  27.4830  0.00  50.89  10.00  0.00  0.00  508.92  1,004,868.59
6021+702.74  0.0000  27.1610  0.00  54.64  1.37  0.00  0.00  74.89  1,004,793.70
6021+720.00  0.0000  22.2720  0.00  49.43  8.63  0.00  0.00  426.58  1,004,367.11
6021+740.00  0.0000  20.6090  0.00  42.88  10.00  0.00  0.00  428.81  1,003,938.30
6021+760.00  0.0000  31.2510  0.00  51.86  10.00  0.00  0.00  518.60  1,003,419.70
6021+775.00  0.0000  38.0990  0.00  69.35  7.50  0.00  0.00  520.13  1,002,899.58
6021+775.00  0.0000  38.0990  0.00  76.20  0.00  0.00  0.00  0.00  1,002,899.58
6021+780.00  0.0000  37.8580  0.00  75.96  2.50  0.00  0.00  189.89  1,002,709.69
6021+800.00  0.0000  33.4830  0.00  71.34  10.00  0.00  0.00  713.41  1,001,996.28
6021+820.00  0.0000  28.6890  0.00  62.17  10.00  0.00  0.00  621.72  1,001,374.56
6021+840.00  0.0000  27.4910  0.00  56.18  10.00  0.00  0.00  561.80  1,000,812.76
6021+852.74  0.0000  26.7070  0.00  54.20  6.37  0.00  0.00  345.30  1,000,467.46
6021+860.00  0.0000  25.5980  0.00  52.31  3.63  0.00  0.00  189.81  1,000,277.65
6021+880.00  0.0000  19.5120  0.00  45.11  10.00  0.00  0.00  451.10  999,826.55 
6021+900.00  0.0000  10.7410  0.00  30.25  10.00  0.00  0.00  302.53  999,524.02 
6021+920.00  0.0000  21.8540  0.00  32.60  10.00  0.00  0.00  325.95  999,198.07 
6021+940.00  0.0000  29.3650  0.00  51.22  10.00  0.00  0.00  512.19  998,685.88 
6021+960.00  0.0000  32.6670  0.00  62.03  10.00  0.00  0.00  620.32  998,065.56 
6021+980.00  0.0000  17.8010  0.00  50.47  10.00  0.00  0.00  504.68  997,560.88 
6022+000.00  0.0000  25.5260  0.00  43.33  10.00  0.00  0.00  433.27  997,127.61 
6022+020.00  0.0000  28.7980  0.00  54.32  10.00  0.00  0.00  543.24  996,584.37 
6022+040.00  0.0000  24.0390  0.00  52.84  10.00  0.00  0.00  528.37  996,056.00 
6022+060.00  0.0000  15.7830  0.00  39.82  10.00  0.00  0.00  398.22  995,657.78 
6022+080.00  0.0000  16.1060  0.00  31.89  10.00  0.00  0.00  318.89  995,338.89 

262 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6022+095.00  0.0000  16.0220  0.00  32.13  7.50  0.00  0.00  240.96  995,097.93 
6022+095.00  0.0000  19.1100  0.00  35.13  0.00  0.00  0.00  0.00  995,097.93 
6022+100.00  0.0000  16.6090  0.00  35.72  2.50  0.00  0.00  89.30  995,008.63 
6022+100.00  0.0000  16.6090  0.00  33.22  0.00  0.00  0.00  0.02  995,008.61 
6022+120.00  0.0000  6.5400  0.00  23.15  10.00  0.00  0.00  231.48  994,777.13 
6022+140.00  1.8880  1.3320  1.89  7.87  10.00  18.88  24.54  78.72  994,722.96 
6022+160.00  0.0000  6.9110  1.89  8.24  10.00  18.88  24.54  82.43  994,665.07 
6022+170.00  1.3870  0.8920  1.39  7.80  5.00  6.94  9.02  39.02  994,635.07 
6022+170.00  1.4700  0.6530  2.86  1.55  0.00  0.00  0.00  0.00  994,635.07 
6022+180.00  5.7060  0.2800  7.18  0.93  5.00  35.88  46.64  4.67  994,677.05 
6022+200.00  0.8130  4.5340  6.52  4.81  10.00  65.19  84.75  48.14  994,713.66 
6022+220.00  0.0000  8.0480  0.81  12.58  10.00  8.13  10.57  125.82  994,598.41 
6022+240.00  0.3170  5.1250  0.32  13.17  10.00  3.17  4.12  131.73  994,470.80 
6022+260.00  0.0000  9.7810  0.32  14.91  10.00  3.17  4.12  149.06  994,325.86 
6022+280.00  0.0000  13.5470  0.00  23.33  10.00  0.00  0.00  233.28  994,092.58 
6022+300.00  0.0000  18.6600  0.00  32.21  10.00  0.00  0.00  322.07  993,770.51 
6022+320.00  0.0000  19.2310  0.00  37.89  10.00  0.00  0.00  378.91  993,391.60 
6022+340.00  0.0000  14.5470  0.00  33.78  10.00  0.00  0.00  337.78  993,053.82 
6022+360.00  0.0000  12.3000  0.00  26.85  10.00  0.00  0.00  268.47  992,785.35 
6022+380.00  0.0000  16.9620  0.00  29.26  10.00  0.00  0.00  292.62  992,492.73 
6022+400.00  0.0000  22.5280  0.00  39.49  10.00  0.00  0.00  394.90  992,097.83 
6022+420.00  0.0000  0.0040  0.00  22.53  10.00  0.00  0.00  225.32  991,872.51 
6022+440.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,872.43 
6022+460.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,872.34 
6022+480.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  991,872.24 
6022+500.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,872.15 
6022+520.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,872.06 
6022+540.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  991,871.96 
6022+560.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,871.87 
6022+580.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,871.78 
6022+600.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  991,871.70 
6022+620.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  991,871.62 
6022+640.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  991,871.55 
6022+660.00  0.0010  0.0050  0.00  0.01  10.00  0.02  0.03  0.09  991,871.48 
6022+680.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  991,871.41 
6022+700.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,871.32 
6022+720.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,871.23 
6022+740.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,871.15 
6022+760.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,871.07 
6022+780.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,870.98 
6022+800.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,870.89 
6022+820.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,870.81 
6022+840.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,870.73 
6022+860.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,870.66 
6022+880.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,870.59 

263 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6022+900.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,870.51 
6022+920.00  0.0010  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  991,870.44 
6022+940.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.09  991,870.37 
6022+960.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  991,870.32 
6022+980.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,870.25 
6023+000.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,870.18 
6023+020.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  991,870.13 
6023+040.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,870.06 
6023+060.00  0.0010  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  991,869.99 
6023+080.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.09  991,869.92 
6023+100.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,869.85 
6023+120.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,869.77 
6023+140.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,869.68 
6023+160.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  991,869.58 
6023+180.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,869.49 
6023+200.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,869.41 
6023+220.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,869.33 
6023+240.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,869.24 
6023+260.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,869.15 
6023+280.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,869.07 
6023+300.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,868.99 
6023+320.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,868.91 
6023+340.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,868.85 
6023+360.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,868.78 
6023+380.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,868.69 
6023+400.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,868.60 
6023+420.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,868.52 
6023+440.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,868.44 
6023+460.00  0.0000  0.0060  0.00  0.01  10.00  0.00  0.00  0.10  991,868.34 
6023+480.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.10  991,868.24 
6023+500.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,868.17 
6023+520.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  991,868.10 
6023+540.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,868.01 
6023+560.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,867.93 
6023+580.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,867.85 
6023+600.00  0.0010  0.0060  0.00  0.01  10.00  0.01  0.01  0.10  991,867.76 
6023+620.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.10  991,867.69 
6023+640.00  0.0010  0.0050  0.00  0.01  10.00  0.02  0.03  0.09  991,867.62 
6023+660.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  991,867.54 
6023+680.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,867.46 
6023+700.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,867.40 
6023+720.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,867.33 
6023+740.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,867.26 
6023+760.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,867.20 
6023+780.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,867.12 

264 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6023+800.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,867.05 
6023+820.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  991,866.98 
6023+840.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  991,866.90 
6023+860.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  991,866.81 
6023+880.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  991,866.72 
6023+880.00  0.0010  0.0040  0.00  0.01  0.00  0.00  0.00  0.00  991,866.72 
6023+900.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  991,866.65 
6023+920.00  0.0000  24.1310  0.00  24.14  10.00  0.00  0.00  241.36  991,625.29 
6023+940.00  0.0000  26.1610  0.00  50.29  10.00  0.00  0.00  502.92  991,122.37 
6023+960.00  0.0000  23.7450  0.00  49.91  10.00  0.00  0.00  499.06  990,623.31 
6023+980.00  0.0000  24.4690  0.00  48.21  10.00  0.00  0.00  482.14  990,141.17 
6024+000.00  0.0000  25.1910  0.00  49.66  10.00  0.00  0.00  496.60  989,644.57 
6024+020.00  0.0000  11.9660  0.00  37.16  10.00  0.00  0.00  371.57  989,273.00 
6024+040.00  0.0000  15.7570  0.00  27.72  10.00  0.00  0.00  277.23  988,995.77 
6024+049.07  0.0000  12.1250  0.00  27.88  4.54  0.00  0.00  126.46  988,869.31 
6024+060.00  0.0000  16.5920  0.00  28.72  5.46  0.00  0.00  156.92  988,712.38 
6024+080.00  0.0000  28.2640  0.00  44.86  10.00  0.00  0.00  448.56  988,263.82 
6024+100.00  0.0000  29.2280  0.00  57.49  10.00  0.00  0.00  574.92  987,688.90 
6024+120.00  0.0000  29.8150  0.00  59.04  10.00  0.00  0.00  590.43  987,098.47 
6024+140.00  0.0000  34.3190  0.00  64.13  10.00  0.00  0.00  641.34  986,457.13 
6024+160.00  0.0000  37.0580  0.00  71.38  10.00  0.00  0.00  713.77  985,743.36 
6024+180.00  0.0000  30.5700  0.00  67.63  10.00  0.00  0.00  676.28  985,067.08 
6024+199.07  0.0000  10.5940  0.00  41.16  9.54  0.00  0.00  392.52  984,674.56 
6024+200.00  0.0000  9.4800  0.00  20.07  0.46  0.00  0.00  9.32  984,665.24 
6024+220.00  4.7210  0.2320  4.72  9.71  10.00  47.21  61.37  97.12  984,629.49 
6024+240.00  0.4020  3.5980  5.12  3.83  10.00  51.23  66.60  38.30  984,657.79 
6024+260.00  0.0000  11.4590  0.40  15.06  10.00  4.02  5.23  150.57  984,512.45 
6024+270.00  0.0000  13.4540  0.00  24.91  5.00  0.00  0.00  124.57  984,387.88 
6024+270.00  0.0000  12.0890  0.00  25.54  0.00  0.00  0.00  0.00  984,387.88 
6024+280.00  0.0000  16.3300  0.00  28.42  5.00  0.00  0.00  142.10  984,245.79 
6024+300.00  0.0000  16.6670  0.00  33.00  10.00  0.00  0.00  329.97  983,915.82 
6024+316.48  0.0000  16.9190  0.00  33.59  8.24  0.00  0.00  276.82  983,639.00 
6024+320.00  0.0000  17.9920  0.00  34.91  1.76  0.00  0.00  61.37  983,577.63 
6024+340.00  0.0000  16.0790  0.00  34.07  10.00  0.00  0.00  340.71  983,236.92 
6024+360.00  0.0000  12.2100  0.00  28.29  10.00  0.00  0.00  282.89  982,954.03 
6024+376.40  0.0000  14.4020  0.00  26.61  8.20  0.00  0.00  218.23  982,735.80 
6024+376.40  0.0000  18.4950                    1,300,000.00
6024+380.00  0.0000  19.2910  0.00  37.79  1.80  0.00  0.00  68.00  1,299,932.00
6024+400.00  0.0000  16.9820  0.00  36.27  10.00  0.00  0.00  362.73  1,299,569.27
6024+420.00  0.0000  13.3590  0.00  30.34  10.00  0.00  0.00  303.41  1,299,265.86
6024+440.00  0.0000  11.7480  0.00  25.11  10.00  0.00  0.00  251.07  1,299,014.79
6024+460.00  0.0000  16.2160  0.00  27.96  10.00  0.00  0.00  279.64  1,298,735.15
6024+480.00  0.0000  29.5570  0.00  45.77  10.00  0.00  0.00  457.73  1,298,277.42
6024+500.00  0.0000  32.0310  0.00  61.59  10.00  0.00  0.00  615.88  1,297,661.54
6024+520.00  0.0000  14.9940  0.00  47.03  10.00  0.00  0.00  470.25  1,297,191.29

265 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6024+540.00  0.0000  11.5240  0.00  26.52  10.00  0.00  0.00  265.18  1,296,926.11
6024+560.00  0.0000  13.6040  0.00  25.13  10.00  0.00  0.00  251.28  1,296,674.83
6024+580.00  0.0000  24.1930  0.00  37.80  10.00  0.00  0.00  377.97  1,296,296.86
6024+600.00  0.0000  26.9690  0.00  51.16  10.00  0.00  0.00  511.62  1,295,785.24
6024+620.00  0.0000  26.9230  0.00  53.89  10.00  0.00  0.00  538.92  1,295,246.32
6024+640.00  0.0000  16.6840  0.00  43.61  10.00  0.00  0.00  436.07  1,294,810.25
6024+660.00  0.7600  11.8650  0.76  28.55  10.00  7.60  9.88  285.49  1,294,534.64
6024+680.00  0.0000  16.6720  0.76  28.54  10.00  7.60  9.88  285.37  1,294,259.15
6024+700.00  0.0000  22.9990  0.00  39.67  10.00  0.00  0.00  396.71  1,293,862.44
6024+720.00  0.0000  24.3060  0.00  47.31  10.00  0.00  0.00  473.05  1,293,389.39
6024+740.00  0.0000  30.9970  0.00  55.30  10.00  0.00  0.00  553.03  1,292,836.36
6024+760.00  0.0000  26.5780  0.00  57.58  10.00  0.00  0.00  575.75  1,292,260.61
6024+780.00  0.0000  32.5330  0.00  59.11  10.00  0.00  0.00  591.11  1,291,669.50
6024+800.00  0.0000  28.2760  0.00  60.81  10.00  0.00  0.00  608.09  1,291,061.41
6024+820.00  0.0000  21.9940  0.00  50.27  10.00  0.00  0.00  502.70  1,290,558.71
6024+840.00  0.0000  26.3930  0.00  48.39  10.00  0.00  0.00  483.87  1,290,074.84
6024+860.00  0.0000  19.0270  0.00  45.42  10.00  0.00  0.00  454.20  1,289,620.64
6024+880.00  0.0000  18.1300  0.00  37.16  10.00  0.00  0.00  371.57  1,289,249.07
6024+900.00  0.0000  20.5420  0.00  38.67  10.00  0.00  0.00  386.72  1,288,862.35
6024+920.00  0.0000  23.6660  0.00  44.21  10.00  0.00  0.00  442.08  1,288,420.27
6024+940.00  0.0000  27.3040  0.00  50.97  10.00  0.00  0.00  509.70  1,287,910.57
6024+960.00  0.0000  27.9140  0.00  55.22  10.00  0.00  0.00  552.18  1,287,358.39
6024+980.00  0.0000  25.2360  0.00  53.15  10.00  0.00  0.00  531.50  1,286,826.89
6025+000.00  0.0000  26.4230  0.00  51.66  10.00  0.00  0.00  516.59  1,286,310.30
6025+020.00  0.0000  32.6180  0.00  59.04  10.00  0.00  0.00  590.41  1,285,719.89
6025+040.00  0.0000  28.9310  0.00  61.55  10.00  0.00  0.00  615.49  1,285,104.40
6025+060.00  0.0000  17.8560  0.00  46.79  10.00  0.00  0.00  467.87  1,284,636.53
6025+080.00  0.0000  14.4010  0.00  32.26  10.00  0.00  0.00  322.57  1,284,313.96
6025+100.00  0.0000  18.3810  0.00  32.78  10.00  0.00  0.00  327.82  1,283,986.14
6025+120.00  0.0000  27.0450  0.00  45.43  10.00  0.00  0.00  454.26  1,283,531.88
6025+140.00  0.0000  28.0780  0.00  55.12  10.00  0.00  0.00  551.23  1,282,980.65
6025+160.00  0.0000  31.5390  0.00  59.62  10.00  0.00  0.00  596.17  1,282,384.48
6025+180.00  0.0000  26.0120  0.00  57.55  10.00  0.00  0.00  575.51  1,281,808.97
6025+200.00  0.0000  14.4510  0.00  40.46  10.00  0.00  0.00  404.63  1,281,404.34
6025+220.00  0.0000  20.5790  0.00  35.03  10.00  0.00  0.00  350.30  1,281,054.04
6025+240.00  0.0000  27.2420  0.00  47.82  10.00  0.00  0.00  478.21  1,280,575.83
6025+260.00  0.0000  37.4420  0.00  64.68  10.00  0.00  0.00  646.84  1,279,928.99
6025+280.00  0.0000  35.2090  0.00  72.65  10.00  0.00  0.00  726.51  1,279,202.48
6025+300.00  0.0000  36.3870  0.00  71.60  10.00  0.00  0.00  715.96  1,278,486.52
6025+320.00  0.0000  35.2830  0.00  71.67  10.00  0.00  0.00  716.70  1,277,769.82
6025+340.00  0.0000  41.2720  0.00  76.56  10.00  0.00  0.00  765.55  1,277,004.27
6025+360.00  0.0000  40.7630  0.00  82.04  10.00  0.00  0.00  820.35  1,276,183.92
6025+380.00  0.0000  32.7150  0.00  73.48  10.00  0.00  0.00  734.78  1,275,449.14
6025+400.00  0.0000  28.9010  0.00  61.62  10.00  0.00  0.00  616.16  1,274,832.98
6025+420.00  0.0000  22.8320  0.00  51.73  10.00  0.00  0.00  517.33  1,274,315.65

266 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6025+440.00  0.0000  21.1810  0.00  44.01  10.00  0.00  0.00  440.13  1,273,875.52
6025+460.00  0.0000  27.4260  0.00  48.61  10.00  0.00  0.00  486.07  1,273,389.45
6025+480.00  0.0000  22.8600  0.00  50.29  10.00  0.00  0.00  502.86  1,272,886.59
6025+500.00  0.0000  30.1990  0.00  53.06  10.00  0.00  0.00  530.59  1,272,356.00
6025+520.00  0.0000  27.7290  0.00  57.93  10.00  0.00  0.00  579.28  1,271,776.72
6025+540.00  0.0000  36.1940  0.00  63.92  10.00  0.00  0.00  639.23  1,271,137.49
6025+560.00  0.0000  29.1140  0.00  65.31  10.00  0.00  0.00  653.08  1,270,484.41
6025+580.00  0.0000  26.2360  0.00  55.35  10.00  0.00  0.00  553.50  1,269,930.91
6025+580.00  0.0000  24.6300  0.00  50.87  0.00  0.00  0.00  0.00  1,269,930.91
6025+600.00  0.0000  20.2100  0.00  44.84  10.00  0.00  0.00  448.40  1,269,482.51
6025+620.00  0.0000  13.8210  0.00  34.03  10.00  0.00  0.00  340.31  1,269,142.20
6025+640.00  0.0000  15.6320  0.00  29.45  10.00  0.00  0.00  294.53  1,268,847.67
6025+660.00  0.0000  13.2670  0.00  28.90  10.00  0.00  0.00  288.99  1,268,558.68
6025+660.00  0.0000  14.9070  0.00  28.17  0.00  0.00  0.00  0.00  1,268,558.68
6025+680.00  0.0000  20.3280  0.00  35.24  10.00  0.00  0.00  352.35  1,268,206.33
6025+700.00  0.0000  33.4080  0.00  53.74  10.00  0.00  0.00  537.36  1,267,668.97
6025+720.00  0.0000  31.0430  0.00  64.45  10.00  0.00  0.00  644.51  1,267,024.46
6025+740.00  0.0000  30.0100  0.00  61.05  10.00  0.00  0.00  610.53  1,266,413.93
6025+760.00  0.0000  24.9910  0.00  55.00  10.00  0.00  0.00  550.01  1,265,863.92
6025+780.00  0.0000  18.6250  0.00  43.62  10.00  0.00  0.00  436.16  1,265,427.76
6025+800.00  0.0000  23.0550  0.00  41.68  10.00  0.00  0.00  416.80  1,265,010.96
6025+820.00  0.0000  22.9700  0.00  46.03  10.00  0.00  0.00  460.25  1,264,550.71
6025+840.00  0.0000  21.0740  0.00  44.04  10.00  0.00  0.00  440.44  1,264,110.27
6025+860.00  0.0000  24.9580  0.00  46.03  10.00  0.00  0.00  460.32  1,263,649.95
6025+880.00  0.0000  26.0910  0.00  51.05  10.00  0.00  0.00  510.49  1,263,139.46
6025+900.00  0.0000  27.3680  0.00  53.46  10.00  0.00  0.00  534.59  1,262,604.87
6025+920.00  0.0000  31.3060  0.00  58.67  10.00  0.00  0.00  586.74  1,262,018.13
6025+940.00  0.0000  29.4610  0.00  60.77  10.00  0.00  0.00  607.67  1,261,410.46
6025+960.00  0.0000  30.4060  0.00  59.87  10.00  0.00  0.00  598.67  1,260,811.79
6025+980.00  0.0000  32.7420  0.00  63.15  10.00  0.00  0.00  631.48  1,260,180.31
6026+000.00  0.0000  32.9530  0.00  65.70  10.00  0.00  0.00  656.95  1,259,523.36
6026+020.00  0.0000  25.0160  0.00  57.97  10.00  0.00  0.00  579.69  1,258,943.67
6026+040.00  0.0000  14.7100  0.00  39.73  10.00  0.00  0.00  397.26  1,258,546.41
6026+060.00  0.0000  18.8360  0.00  33.55  10.00  0.00  0.00  335.46  1,258,210.95
6026+080.00  0.0000  24.7810  0.00  43.62  10.00  0.00  0.00  436.17  1,257,774.78
6026+100.00  0.0000  27.6360  0.00  52.42  10.00  0.00  0.00  524.17  1,257,250.61
6026+120.00  0.0000  22.3240  0.00  49.96  10.00  0.00  0.00  499.60  1,256,751.01
6026+140.00  0.0000  35.2060  0.00  57.53  10.00  0.00  0.00  575.30  1,256,175.71
6026+160.00  0.0000  27.5380  0.00  62.74  10.00  0.00  0.00  627.44  1,255,548.27
6026+180.00  0.0000  24.5500  0.00  52.09  10.00  0.00  0.00  520.88  1,255,027.39
6026+200.00  0.7750  13.5580  0.78  38.11  10.00  7.75  10.08  381.08  1,254,656.39
6026+220.00  0.0000  30.4150  0.78  43.97  10.00  7.75  10.08  439.73  1,254,226.73
6026+240.00  0.0000  39.0640  0.00  69.48  10.00  0.00  0.00  694.79  1,253,531.94
6026+260.00  0.0000  38.8780  0.00  77.94  10.00  0.00  0.00  779.42  1,252,752.52
6026+280.00  0.0000  34.0380  0.00  72.92  10.00  0.00  0.00  729.16  1,252,023.36

267 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6026+290.99  0.0000  34.7310  0.00  68.77  5.49  0.00  0.00  377.82  1,251,645.55
6026+300.00  0.0000  32.9380  0.00  67.67  4.51  0.00  0.00  304.92  1,251,340.63
6026+320.00  0.0000  28.7980  0.00  61.74  10.00  0.00  0.00  617.36  1,250,723.27
6026+320.99  0.0000  28.8040  0.00  57.60  0.49  0.00  0.00  28.46  1,250,694.82
6026+340.00  0.0000  37.0170  0.00  65.82  9.51  0.00  0.00  625.69  1,250,069.12
6026+360.00  0.0000  27.3380  0.00  64.36  10.00  0.00  0.00  643.55  1,249,425.57
6026+380.00  0.4430  15.3960  0.44  42.73  10.00  4.43  5.76  427.34  1,249,003.99
6026+400.00  0.0000  19.3930  0.44  34.79  10.00  4.43  5.76  347.89  1,248,661.86
6026+407.71  0.0000  22.5780  0.00  41.97  3.85  0.00  0.00  161.76  1,248,500.10
6026+420.00  0.0000  24.3140  0.00  46.89  6.15  0.00  0.00  288.20  1,248,211.90
6026+437.71  0.0000  26.7630  0.00  51.08  8.85  0.00  0.00  452.24  1,247,759.67
6026+440.00  0.0000  27.4350  0.00  54.20  1.15  0.00  0.00  62.11  1,247,697.56
6026+460.00  0.0000  32.2960  0.00  59.73  10.00  0.00  0.00  597.31  1,247,100.25
6026+480.00  0.0000  26.3480  0.00  58.64  10.00  0.00  0.00  586.44  1,246,513.81
6026+500.00  0.0000  19.2620  0.00  45.61  10.00  0.00  0.00  456.10  1,246,057.71
6026+520.00  0.0000  33.8890  0.00  53.15  10.00  0.00  0.00  531.51  1,245,526.20
6026+540.00  0.0000  25.0760  0.00  58.97  10.00  0.00  0.00  589.65  1,244,936.55
6026+560.00  0.0000  15.2730  0.00  40.35  10.00  0.00  0.00  403.49  1,244,533.06
6026+580.00  0.0000  29.4000  0.00  44.67  10.00  0.00  0.00  446.73  1,244,086.33
6026+600.00  0.0000  34.3630  0.00  63.76  10.00  0.00  0.00  637.63  1,243,448.70
6026+620.00  0.0000  28.3950  0.00  62.76  10.00  0.00  0.00  627.58  1,242,821.12
6026+640.00  0.0000  30.3600  0.00  58.76  10.00  0.00  0.00  587.55  1,242,233.57
6026+660.00  0.0000  26.7610  0.00  57.12  10.00  0.00  0.00  571.21  1,241,662.36
6026+680.00  0.0000  22.7680  0.00  49.53  10.00  0.00  0.00  495.29  1,241,167.07
6026+700.00  0.0000  32.3800  0.00  55.15  10.00  0.00  0.00  551.48  1,240,615.59
6026+720.00  0.0000  31.4450  0.00  63.83  10.00  0.00  0.00  638.25  1,239,977.34
6026+740.00  0.0000  31.1500  0.00  62.60  10.00  0.00  0.00  625.95  1,239,351.39
6026+760.00  0.0000  31.6540  0.00  62.80  10.00  0.00  0.00  628.04  1,238,723.35
6026+780.00  0.0000  29.1670  0.00  60.82  10.00  0.00  0.00  608.21  1,238,115.14
6026+800.00  0.0000  19.2240  0.00  48.39  10.00  0.00  0.00  483.91  1,237,631.23
6026+820.00  0.0000  13.4450  0.00  32.67  10.00  0.00  0.00  326.69  1,237,304.54
6026+840.00  0.0000  20.7030  0.00  34.15  10.00  0.00  0.00  341.48  1,236,963.06
6026+860.00  0.0000  24.5230  0.00  45.23  10.00  0.00  0.00  452.26  1,236,510.80
6026+880.00  0.0000  31.0860  0.00  55.61  10.00  0.00  0.00  556.09  1,235,954.71
6026+900.00  0.0000  24.1840  0.00  55.27  10.00  0.00  0.00  552.70  1,235,402.01
6026+920.00  0.0000  23.1060  0.00  47.29  10.00  0.00  0.00  472.90  1,234,929.11
6026+940.00  0.0000  25.9210  0.00  49.03  10.00  0.00  0.00  490.27  1,234,438.84
6026+960.00  0.0000  34.0610  0.00  59.98  10.00  0.00  0.00  599.82  1,233,839.02
6026+980.00  0.0000  32.5820  0.00  66.64  10.00  0.00  0.00  666.43  1,233,172.59
6027+000.00  0.0000  24.6670  0.00  57.25  10.00  0.00  0.00  572.49  1,232,600.10
6027+020.00  0.0000  28.7630  0.00  53.43  10.00  0.00  0.00  534.30  1,232,065.80
6027+040.00  0.0000  26.9420  0.00  55.71  10.00  0.00  0.00  557.05  1,231,508.75
6027+060.00  0.0000  35.2320  0.00  62.17  10.00  0.00  0.00  621.74  1,230,887.01
6027+080.00  0.0000  27.1550  0.00  62.39  10.00  0.00  0.00  623.87  1,230,263.14
6027+100.00  0.0000  24.9420  0.00  52.10  10.00  0.00  0.00  520.97  1,229,742.17

268 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6027+120.00  0.0000  21.8040  0.00  46.75  10.00  0.00  0.00  467.46  1,229,274.71
6027+140.00  0.0000  14.9730  0.00  36.78  10.00  0.00  0.00  367.77  1,228,906.94
6027+160.00  0.0000  12.3260  0.00  27.30  10.00  0.00  0.00  272.99  1,228,633.95
6027+180.00  0.8610  9.9270  0.86  22.25  10.00  8.61  11.19  222.53  1,228,422.61
6027+200.00  0.0000  19.8220  0.86  29.75  10.00  8.61  11.19  297.49  1,228,136.31
6027+220.00  0.0000  21.3350  0.00  41.16  10.00  0.00  0.00  411.57  1,227,724.74
6027+240.00  0.0000  25.6250  0.00  46.96  10.00  0.00  0.00  469.60  1,227,255.14
6027+260.00  0.0000  16.7060  0.00  42.33  10.00  0.00  0.00  423.31  1,226,831.83
6027+280.00  0.0000  19.6450  0.00  36.35  10.00  0.00  0.00  363.51  1,226,468.32
6027+300.00  0.0000  15.8960  0.00  35.54  10.00  0.00  0.00  355.41  1,226,112.91
6027+320.00  0.0000  17.8370  0.00  33.73  10.00  0.00  0.00  337.33  1,225,775.58
6027+340.00  0.0000  20.1730  0.00  38.01  10.00  0.00  0.00  380.10  1,225,395.48
6027+360.00  2.5230  9.7130  2.52  29.89  10.00  25.23  32.80  298.86  1,225,129.42
6027+380.00  4.6760  4.5610  7.20  14.27  10.00  71.99  93.59  142.74  1,225,080.27
6027+400.00  0.0000  16.6480  4.68  21.21  10.00  46.76  60.79  212.09  1,224,928.97
6027+420.00  0.0000  25.0520  0.00  41.70  10.00  0.00  0.00  417.00  1,224,511.97
6027+440.00  0.0000  27.0240  0.00  52.08  10.00  0.00  0.00  520.76  1,223,991.21
6027+460.00  0.0000  29.0230  0.00  56.05  10.00  0.00  0.00  560.47  1,223,430.74
6027+480.00  0.0000  36.2890  0.00  65.31  10.00  0.00  0.00  653.12  1,222,777.62
6027+500.00  0.0000  33.9780  0.00  70.27  10.00  0.00  0.00  702.67  1,222,074.95
6027+520.00  0.0000  29.4660  0.00  63.44  10.00  0.00  0.00  634.44  1,221,440.51
6027+540.00  0.0000  19.5900  0.00  49.06  10.00  0.00  0.00  490.56  1,220,949.95
6027+560.00  0.0000  26.0760  0.00  45.67  10.00  0.00  0.00  456.66  1,220,493.29
6027+565.00  0.0000  29.4520  0.00  55.53  2.50  0.00  0.00  138.82  1,220,354.47
6027+565.00  0.0000  29.4520  0.00  58.90  0.00  0.00  0.00  0.00  1,220,354.47
6027+580.00  0.0000  34.3000  0.00  63.75  7.50  0.00  0.00  478.14  1,219,876.33
6027+600.00  0.0000  24.2410  0.00  58.54  10.00  0.00  0.00  585.41  1,219,290.92
6027+620.00  0.0000  25.9000  0.00  50.14  10.00  0.00  0.00  501.41  1,218,789.51
6027+640.00  0.0000  32.2200  0.00  58.12  10.00  0.00  0.00  581.20  1,218,208.31
6027+660.00  0.0000  21.4000  0.00  53.62  10.00  0.00  0.00  536.20  1,217,672.11
6027+680.00  0.0000  30.7310  0.00  52.13  10.00  0.00  0.00  521.31  1,217,150.80
6027+700.00  0.0000  34.1170  0.00  64.85  10.00  0.00  0.00  648.48  1,216,502.32
6027+720.00  0.0000  34.1850  0.00  68.30  10.00  0.00  0.00  683.02  1,215,819.30
6027+740.00  0.0000  37.4990  0.00  71.68  10.00  0.00  0.00  716.84  1,215,102.46
6027+760.00  0.0000  32.2280  0.00  69.73  10.00  0.00  0.00  697.27  1,214,405.19
6027+780.00  0.0000  33.5960  0.00  65.82  10.00  0.00  0.00  658.24  1,213,746.95
6027+800.00  0.0000  22.7810  0.00  56.38  10.00  0.00  0.00  563.77  1,213,183.18
6027+820.00  0.0000  22.5520  0.00  45.33  10.00  0.00  0.00  453.33  1,212,729.85
6027+840.00  0.0000  23.3070  0.00  45.86  10.00  0.00  0.00  458.59  1,212,271.26
6027+860.00  0.0000  24.5740  0.00  47.88  10.00  0.00  0.00  478.81  1,211,792.45
6027+880.00  0.0000  24.9030  0.00  49.48  10.00  0.00  0.00  494.77  1,211,297.68
6027+900.00  0.0000  19.1890  0.00  44.09  10.00  0.00  0.00  440.92  1,210,856.76
6027+920.00  0.0000  15.2590  0.00  34.45  10.00  0.00  0.00  344.48  1,210,512.28
6027+940.00  0.0000  14.9190  0.00  30.18  10.00  0.00  0.00  301.78  1,210,210.50
6027+960.00  0.0000  18.9210  0.00  33.84  10.00  0.00  0.00  338.40  1,209,872.10

269 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6027+980.00  0.0000  22.3200  0.00  41.24  10.00  0.00  0.00  412.41  1,209,459.69
6027+990.00  0.0000  23.0800  0.00  45.40  5.00  0.00  0.00  227.00  1,209,232.69
6027+990.00  0.0000  23.8400  0.00  46.92  0.00  0.00  0.00  0.00  1,209,232.69
6028+000.00  0.0000  23.3260  0.00  47.17  5.00  0.00  0.00  235.83  1,208,996.86
6028+000.00  0.0000  23.3260  0.00  46.65  0.00  0.00  0.00  0.00  1,208,996.86
6028+020.00  0.0000  20.8380  0.00  44.16  10.00  0.00  0.00  441.64  1,208,555.22
6028+040.00  1.4840  11.1680  1.48  32.01  10.00  14.84  19.29  320.06  1,208,254.45
6028+060.00  0.0000  19.4650  1.48  30.63  10.00  14.84  19.29  306.33  1,207,967.41
6028+080.00  0.0000  21.6240  0.00  41.09  10.00  0.00  0.00  410.89  1,207,556.52
6028+100.00  0.0000  18.1460  0.00  39.77  10.00  0.00  0.00  397.70  1,207,158.82
6028+120.00  0.0000  19.1770  0.00  37.32  10.00  0.00  0.00  373.23  1,206,785.59
6028+140.00  0.0000  21.5640  0.00  40.74  10.00  0.00  0.00  407.41  1,206,378.18
6028+140.00  0.0000  21.5640  0.00  43.13  0.00  0.00  0.00  0.00  1,206,378.18
6028+160.00  0.0000  25.1440  0.00  46.71  10.00  0.00  0.00  467.08  1,205,911.10
6028+180.00  0.0000  25.7490  0.00  50.89  10.00  0.00  0.00  508.93  1,205,402.17
6028+200.00  0.0000  31.6450  0.00  57.39  10.00  0.00  0.00  573.94  1,204,828.23
6028+220.00  0.0000  30.1010  0.00  61.75  10.00  0.00  0.00  617.46  1,204,210.77
6028+240.00  0.0000  31.3580  0.00  61.46  10.00  0.00  0.00  614.59  1,203,596.18
6028+260.00  0.0000  28.5630  0.00  59.92  10.00  0.00  0.00  599.21  1,202,996.97
6028+280.00  0.0000  27.6620  0.00  56.23  10.00  0.00  0.00  562.25  1,202,434.72
6028+300.00  0.0000  31.4830  0.00  59.15  10.00  0.00  0.00  591.45  1,201,843.27
6028+320.00  0.0000  27.2530  0.00  58.74  10.00  0.00  0.00  587.36  1,201,255.91
6028+340.00  0.0000  23.7530  0.00  51.01  10.00  0.00  0.00  510.06  1,200,745.85
6028+360.00  0.0000  26.3710  0.00  50.12  10.00  0.00  0.00  501.24  1,200,244.61
6028+380.00  0.0000  28.3840  0.00  54.76  10.00  0.00  0.00  547.55  1,199,697.06
6028+400.00  0.0000  25.1630  0.00  53.55  10.00  0.00  0.00  535.47  1,199,161.59
6028+420.00  0.0000  25.7060  0.00  50.87  10.00  0.00  0.00  508.69  1,198,652.90
6028+440.00  0.0000  25.2820  0.00  50.99  10.00  0.00  0.00  509.88  1,198,143.02
6028+460.00  0.0000  29.3640  0.00  54.65  10.00  0.00  0.00  546.46  1,197,596.56
6028+480.00  0.0000  31.4000  0.00  60.76  10.00  0.00  0.00  607.64  1,196,988.92
6028+500.00  0.0000  29.7910  0.00  61.19  10.00  0.00  0.00  611.91  1,196,377.01
6028+520.00  0.0000  33.7000  0.00  63.49  10.00  0.00  0.00  634.91  1,195,742.10
6028+540.00  0.0000  28.0440  0.00  61.74  10.00  0.00  0.00  617.44  1,195,124.66
6028+560.00  0.0000  25.5560  0.00  53.60  10.00  0.00  0.00  536.00  1,194,588.66
6028+580.00  0.0000  30.4030  0.00  55.96  10.00  0.00  0.00  559.59  1,194,029.07
6028+600.00  0.0000  33.8000  0.00  64.20  10.00  0.00  0.00  642.03  1,193,387.04
6028+620.00  0.0000  35.1830  0.00  68.98  10.00  0.00  0.00  689.83  1,192,697.21
6028+640.00  0.0000  37.4430  0.00  72.63  10.00  0.00  0.00  726.26  1,191,970.95
6028+660.00  0.0000  33.7600  0.00  71.20  10.00  0.00  0.00  712.03  1,191,258.92
6028+680.00  0.0000  35.5720  0.00  69.33  10.00  0.00  0.00  693.32  1,190,565.60
6028+700.00  0.0000  39.6960  0.00  75.27  10.00  0.00  0.00  752.68  1,189,812.92
6028+720.00  0.0000  40.4130  0.00  80.11  10.00  0.00  0.00  801.09  1,189,011.83
6028+740.00  0.0000  40.2180  0.00  80.63  10.00  0.00  0.00  806.31  1,188,205.52
6028+760.00  0.0000  39.0730  0.00  79.29  10.00  0.00  0.00  792.91  1,187,412.61
6028+780.00  0.0000  36.9570  0.00  76.03  10.00  0.00  0.00  760.30  1,186,652.31

270 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6028+800.00  0.0000  39.1220  0.00  76.08  10.00  0.00  0.00  760.79  1,185,891.52
6028+820.00  0.0000  40.3590  0.00  79.48  10.00  0.00  0.00  794.81  1,185,096.71
6028+840.00  0.0000  39.1100  0.00  79.47  10.00  0.00  0.00  794.69  1,184,302.02
6028+860.00  0.0000  34.5360  0.00  73.65  10.00  0.00  0.00  736.46  1,183,565.56
6028+880.00  0.0000  32.0570  0.00  66.59  10.00  0.00  0.00  665.93  1,182,899.63
6028+900.00  0.0000  36.8430  0.00  68.90  10.00  0.00  0.00  689.00  1,182,210.63
6028+920.00  0.0000  37.1880  0.00  74.03  10.00  0.00  0.00  740.31  1,181,470.32
6028+940.00  0.0000  29.4780  0.00  66.67  10.00  0.00  0.00  666.66  1,180,803.66
6028+960.00  0.0000  21.7770  0.00  51.26  10.00  0.00  0.00  512.55  1,180,291.11
6028+980.00  0.0000  23.6380  0.00  45.42  10.00  0.00  0.00  454.15  1,179,836.96
6029+000.00  0.0000  24.4090  0.00  48.05  10.00  0.00  0.00  480.47  1,179,356.49
6029+020.00  0.0000  24.8480  0.00  49.26  10.00  0.00  0.00  492.57  1,178,863.92
6029+040.00  0.0000  23.7070  0.00  48.56  10.00  0.00  0.00  485.55  1,178,378.37
6029+060.00  0.0000  23.9490  0.00  47.66  10.00  0.00  0.00  476.56  1,177,901.81
6029+080.00  0.0000  29.7590  0.00  53.71  10.00  0.00  0.00  537.08  1,177,364.73
6029+100.00  0.0000  31.0270  0.00  60.79  10.00  0.00  0.00  607.86  1,176,756.87
6029+120.00  0.0000  30.9890  0.00  62.02  10.00  0.00  0.00  620.16  1,176,136.71
6029+140.00  0.0000  29.5070  0.00  60.50  10.00  0.00  0.00  604.96  1,175,531.75
6029+160.00  0.0000  23.0850  0.00  52.59  10.00  0.00  0.00  525.92  1,175,005.83
6029+180.00  0.0000  23.1430  0.00  46.23  10.00  0.00  0.00  462.28  1,174,543.55
6029+200.00  0.0000  28.5950  0.00  51.74  10.00  0.00  0.00  517.38  1,174,026.17
6029+220.00  0.0000  27.1910  0.00  55.79  10.00  0.00  0.00  557.86  1,173,468.31
6029+240.00  0.0000  23.5340  0.00  50.73  10.00  0.00  0.00  507.25  1,172,961.06
6029+255.00  0.0000  17.3570  0.00  40.89  7.50  0.00  0.00  306.68  1,172,654.38
6029+255.00  0.0000  14.3180  0.00  31.68  0.00  0.00  0.00  0.00  1,172,654.38
6029+260.00  0.0000  14.8510  0.00  29.17  2.50  0.00  0.00  72.92  1,172,581.46
6029+280.00  0.0000  16.8520  0.00  31.70  10.00  0.00  0.00  317.03  1,172,264.43
6029+300.00  0.0000  25.7790  0.00  42.63  10.00  0.00  0.00  426.31  1,171,838.12
6029+320.00  0.0000  28.2630  0.00  54.04  10.00  0.00  0.00  540.42  1,171,297.70
6029+340.00  0.0000  30.8520  0.00  59.12  10.00  0.00  0.00  591.15  1,170,706.55
6029+340.00  0.0000  38.0460  0.00  68.90  0.00  0.00  0.00  0.00  1,170,706.55
6029+360.00  0.0000  35.8340  0.00  73.88  10.00  0.00  0.00  738.80  1,169,967.75
6029+380.00  0.0000  28.0490  0.00  63.88  10.00  0.00  0.00  638.83  1,169,328.92
6029+400.00  0.0000  27.9010  0.00  55.95  10.00  0.00  0.00  559.50  1,168,769.42
6029+420.00  0.0000  37.4680  0.00  65.37  10.00  0.00  0.00  653.69  1,168,115.73
6029+440.00  0.0000  36.0630  0.00  73.53  10.00  0.00  0.00  735.31  1,167,380.42
6029+449.97  0.0000  33.0710  0.00  69.13  4.98  0.00  0.00  344.46  1,167,035.96
6029+460.00  0.0000  29.8420  0.00  62.91  5.02  0.00  0.00  315.67  1,166,720.29
6029+480.00  0.0000  23.2730  0.00  53.12  10.00  0.00  0.00  531.15  1,166,189.14
6029+500.00  0.0000  32.6230  0.00  55.90  10.00  0.00  0.00  558.96  1,165,630.18
6029+520.00  0.0000  36.7840  0.00  69.41  10.00  0.00  0.00  694.07  1,164,936.11
6029+540.00  0.0000  43.3890  0.00  80.17  10.00  0.00  0.00  801.73  1,164,134.38
6029+560.00  0.0000  49.5710  0.00  92.96  10.00  0.00  0.00  929.60  1,163,204.78
6029+580.00  0.0000  37.4790  0.00  87.05  10.00  0.00  0.00  870.50  1,162,334.28
6029+599.97  0.0000  40.7110  0.00  78.19  9.98  0.00  0.00  780.53  1,161,553.75

271 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Áreas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000  

6029+600.00  0.0000  40.7130  0.00  81.42  0.02  0.00  0.00  1.42  1,161,552.32
6029+620.00  0.0000  33.9750  0.00  74.69  10.00  0.00  0.00  746.88  1,160,805.44
6029+620.00  0.0000  39.9260  0.00  73.90  0.00  0.00  0.00  0.00  1,160,805.44
6029+640.00  0.0000  29.4560  0.00  69.38  10.00  0.00  0.00  693.82  1,160,111.62
6029+660.00  0.0000  38.6280  0.00  68.08  10.00  0.00  0.00  680.84  1,159,430.78
6029+680.00  0.0000  39.8340  0.00  78.46  10.00  0.00  0.00  784.62  1,158,646.16
6029+700.00  0.0000  37.9490  0.00  77.78  10.00  0.00  0.00  777.83  1,157,868.33
6029+720.00  0.0000  29.6400  0.00  67.59  10.00  0.00  0.00  675.89  1,157,192.44
6029+740.00  0.0000  35.8800  0.00  65.52  10.00  0.00  0.00  655.20  1,156,537.24
6029+760.00  0.0000  46.8700  0.00  82.75  10.00  0.00  0.00  827.50  1,155,709.74
6029+780.00  0.0000  41.2350  0.00  88.11  10.00  0.00  0.00  881.05  1,154,828.69
6029+800.00  0.0000  50.9280  0.00  92.16  10.00  0.00  0.00  921.63  1,153,907.06
6029+820.00  0.0000  52.7510  0.00  103.68  10.00  0.00  0.00  1,036.79  1,152,870.27
6029+840.00  0.0000  44.7120  0.00  97.46  10.00  0.00  0.00  974.63  1,151,895.64
6029+860.00  0.0000  43.5190  0.00  88.23  10.00  0.00  0.00  882.31  1,151,013.33
6029+880.00  0.0000  37.9330  0.00  81.45  10.00  0.00  0.00  814.52  1,150,198.81
6029+900.00  0.0000  47.3090  0.00  85.24  10.00  0.00  0.00  852.42  1,149,346.39
6029+920.00  0.0000  47.6250  0.00  94.93  10.00  0.00  0.00  949.34  1,148,397.05
6029+940.00  0.0000  46.6630  0.00  94.29  10.00  0.00  0.00  942.88  1,147,454.17
6029+960.00  0.0000  43.6220  0.00  90.29  10.00  0.00  0.00  902.85  1,146,551.32
6029+980.00  0.0000  32.2430  0.00  75.87  10.00  0.00  0.00  758.65  1,145,792.67
6030+000.00  0.0000  21.7420  0.00  53.99  10.00  0.00  0.00  539.85  1,145,252.82
 

TABLA 28 CÁLCULO DE CURVA MASA DEL TRAMO DEL 6036+800– 6067+000 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6036+800.00  0.0000  47.4690                    1,300,000.00


6036+820.00  0.0000  36.1660  0.00  83.64  10.00  0.00  0.00  836.35  1,299,163.65
6036+840.00  0.0000  37.9500  0.00  74.12  10.00  0.00  0.00  741.16  1,298,422.49
6036+860.00  0.0000  35.9050  0.00  73.86  10.00  0.00  0.00  738.55  1,297,683.94
6036+880.00  0.0000  39.4590  0.00  75.36  10.00  0.00  0.00  753.64  1,296,930.30
6036+900.00  0.0000  54.0400  0.00  93.50  10.00  0.00  0.00  934.99  1,295,995.31
6036+920.00  0.0000  48.5020  0.00  102.54  10.00  0.00  0.00  1,025.42  1,294,969.89
6036+940.00  0.0000  37.6910  0.00  86.19  10.00  0.00  0.00  861.93  1,294,107.96
6036+960.00  0.0000  41.5360  0.00  79.23  10.00  0.00  0.00  792.27  1,293,315.69
6036+980.00  0.0000  43.2100  0.00  84.75  10.00  0.00  0.00  847.46  1,292,468.23
6036+992.12  0.0000  38.0480  0.00  81.26  6.06  0.00  0.00  492.34  1,291,975.89
6037+000.00  0.0000  33.8560  0.00  71.90  3.94  0.00  0.00  283.37  1,291,692.51
6037+020.00  0.0000  37.2120  0.00  71.07  10.00  0.00  0.00  710.68  1,290,981.83
6037+040.00  0.0000  36.8560  0.00  74.07  10.00  0.00  0.00  740.68  1,290,241.15

272 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6037+060.00  0.0000  41.1700  0.00  78.03  10.00  0.00  0.00  780.26  1,289,460.89
6037+080.00  0.0000  39.5640  0.00  80.73  10.00  0.00  0.00  807.34  1,288,653.55
6037+100.00  0.0000  38.8360  0.00  78.40  10.00  0.00  0.00  784.00  1,287,869.55
6037+120.00  0.0000  27.0550  0.00  65.89  10.00  0.00  0.00  658.91  1,287,210.64
6037+140.00  0.0000  15.8240  0.00  42.88  10.00  0.00  0.00  428.79  1,286,781.85
6037+142.12  0.0000  17.5320  0.00  33.36  1.06  0.00  0.00  35.32  1,286,746.53
6037+160.00  0.0000  32.5560  0.00  50.09  8.94  0.00  0.00  447.84  1,286,298.69
6037+180.00  0.0000  38.2400  0.00  70.80  10.00  0.00  0.00  707.96  1,285,590.73
6037+200.00  0.0000  26.8390  0.00  65.08  10.00  0.00  0.00  650.79  1,284,939.94
6037+220.00  0.0000  20.0160  0.00  46.86  10.00  0.00  0.00  468.55  1,284,471.39
6037+240.00  0.0000  11.4080  0.00  31.42  10.00  0.00  0.00  314.24  1,284,157.15
6037+260.00  0.0000  11.2410  0.00  22.65  10.00  0.00  0.00  226.49  1,283,930.66
6037+280.00  0.0000  22.3960  0.00  33.64  10.00  0.00  0.00  336.37  1,283,594.29
6037+300.00  0.0000  26.8800  0.00  49.28  10.00  0.00  0.00  492.76  1,283,101.53
6037+316.55  0.0000  20.7820  0.00  47.66  8.28  0.00  0.00  394.50  1,282,707.03
6037+320.00  0.0000  18.5950  0.00  39.38  1.72  0.00  0.00  67.85  1,282,639.19
6037+340.00  1.2290  2.8820  1.23  21.48  10.00  12.29  15.98  214.77  1,282,440.40
6037+360.00  0.0000  19.8330  1.23  22.72  10.00  12.29  15.98  227.15  1,282,229.22
6037+380.00  0.0000  33.5430  0.00  53.38  10.00  0.00  0.00  533.76  1,281,695.46
6037+400.00  0.0000  28.5390  0.00  62.08  10.00  0.00  0.00  620.82  1,281,074.64
6037+420.00  0.0000  17.9960  0.00  46.54  10.00  0.00  0.00  465.35  1,280,609.29
6037+440.00  0.0000  25.4060  0.00  43.40  10.00  0.00  0.00  434.02  1,280,175.27
6037+460.00  0.0000  29.0280  0.00  54.43  10.00  0.00  0.00  544.34  1,279,630.93
6037+466.55  0.0000  26.3830  0.00  55.41  3.28  0.00  0.00  181.55  1,279,449.38
6037+480.00  0.0000  21.3590  0.00  47.74  6.72  0.00  0.00  320.99  1,279,128.38
6037+500.00  0.0000  22.4810  0.00  43.84  10.00  0.00  0.00  438.40  1,278,689.98
6037+520.00  4.6710  0.1950  4.67  22.68  10.00  46.71  60.72  226.76  1,278,523.95
6037+540.00  0.0000  15.9350  4.67  16.13  10.00  46.71  60.72  161.30  1,278,423.37
6037+560.00  0.0000  20.7540  0.00  36.69  10.00  0.00  0.00  366.89  1,278,056.48
6037+580.00  0.0000  27.1270  0.00  47.88  10.00  0.00  0.00  478.81  1,277,577.67
6037+600.00  0.0000  30.7070  0.00  57.83  10.00  0.00  0.00  578.34  1,276,999.33
6037+620.00  0.0000  34.8150  0.00  65.52  10.00  0.00  0.00  655.22  1,276,344.11
6037+640.00  0.0000  33.5060  0.00  68.32  10.00  0.00  0.00  683.21  1,275,660.90
6037+660.00  0.0000  23.5280  0.00  57.03  10.00  0.00  0.00  570.34  1,275,090.56
6037+680.00  0.0000  32.8530  0.00  56.38  10.00  0.00  0.00  563.81  1,274,526.75
6037+700.00  0.0000  19.5110  0.00  52.36  10.00  0.00  0.00  523.64  1,274,003.11
6037+720.00  1.4190  3.8680  1.42  23.38  10.00  14.19  18.45  233.79  1,273,787.77
6037+740.00  0.0000  12.2710  1.42  16.14  10.00  14.19  18.45  161.39  1,273,644.82
6037+760.00  0.0000  14.8670  0.00  27.14  10.00  0.00  0.00  271.38  1,273,373.44
6037+780.00  0.7160  4.1190  0.72  18.99  10.00  7.16  9.31  189.86  1,273,192.89
6037+800.00  0.0000  14.7170  0.72  18.84  10.00  7.16  9.31  188.36  1,273,013.84
6037+820.00  0.0000  10.0550  0.00  24.77  10.00  0.00  0.00  247.72  1,272,766.12
6037+840.00  0.0000  22.8570  0.00  32.91  10.00  0.00  0.00  329.12  1,272,437.00
6037+860.00  0.0000  19.2580  0.00  42.12  10.00  0.00  0.00  421.15  1,272,015.85
6037+880.00  0.0000  20.0630  0.00  39.32  10.00  0.00  0.00  393.21  1,271,622.64

273 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6037+900.00  0.3220  11.4930  0.32  31.56  10.00  3.22  4.19  315.56  1,271,311.27
6037+920.00  0.7470  9.7650  1.07  21.26  10.00  10.69  13.90  212.58  1,271,112.58
6037+940.00  0.0000  9.5860  0.75  19.35  10.00  7.47  9.71  193.51  1,270,928.78
6037+960.00  0.0000  16.6700  0.00  26.26  10.00  0.00  0.00  262.56  1,270,666.22
6037+980.00  0.0000  18.9660  0.00  35.64  10.00  0.00  0.00  356.36  1,270,309.86
6038+000.00  0.0000  17.7860  0.00  36.75  10.00  0.00  0.00  367.52  1,269,942.34
6038+020.00  0.0000  19.3830  0.00  37.17  10.00  0.00  0.00  371.69  1,269,570.65
6038+040.00  0.0000  24.4300  0.00  43.81  10.00  0.00  0.00  438.13  1,269,132.52
6038+060.00  0.0000  25.8360  0.00  50.27  10.00  0.00  0.00  502.66  1,268,629.86
6038+080.00  0.0000  21.6800  0.00  47.52  10.00  0.00  0.00  475.16  1,268,154.70
6038+100.00  0.0000  20.2650  0.00  41.95  10.00  0.00  0.00  419.45  1,267,735.25
6038+120.00  0.6600  6.8890  0.66  27.15  10.00  6.60  8.58  271.54  1,267,472.29
6038+140.00  0.4720  11.0630  1.13  17.95  10.00  11.32  14.72  179.52  1,267,307.49
6038+160.00  0.0000  15.2170  0.47  26.28  10.00  4.72  6.14  262.80  1,267,050.83
6038+180.00  0.0000  15.2370  0.00  30.45  10.00  0.00  0.00  304.54  1,266,746.29
6038+200.00  2.3180  0.8530  2.32  16.09  10.00  23.18  30.13  160.90  1,266,615.52
6038+220.00  13.6560  0.2370  15.97  1.09  10.00  159.74  207.66  10.90  1,266,812.28
6038+240.00  4.0860  0.8540  17.74  1.09  10.00  177.42  230.65  10.91  1,267,032.02
6038+260.00  0.0000  15.5030  4.09  16.36  10.00  40.86  53.12  163.57  1,266,921.57
6038+280.00  0.0000  19.0450  0.00  34.55  10.00  0.00  0.00  345.48  1,266,576.09
6038+300.00  0.0000  19.9110  0.00  38.96  10.00  0.00  0.00  389.56  1,266,186.53
6038+320.00  0.0000  20.2210  0.00  40.13  10.00  0.00  0.00  401.32  1,265,785.21
6038+340.00  0.0000  16.7020  0.00  36.92  10.00  0.00  0.00  369.23  1,265,415.98
6038+360.00  0.0000  19.0320  0.00  35.73  10.00  0.00  0.00  357.34  1,265,058.64
6038+380.00  0.0000  9.3070  0.00  28.34  10.00  0.00  0.00  283.39  1,264,775.25
6038+400.00  2.0040  1.8680  2.00  11.18  10.00  20.04  26.05  111.75  1,264,689.55
6038+420.00  0.0000  13.7420  2.00  15.61  10.00  20.04  26.05  156.10  1,264,559.50
6038+440.00  1.0780  3.0490  1.08  16.79  10.00  10.78  14.01  167.91  1,264,405.60
6038+460.00  0.0000  17.2850  1.08  20.33  10.00  10.78  14.01  203.34  1,264,216.28
6038+480.00  0.0000  18.3580  0.00  35.64  10.00  0.00  0.00  356.43  1,263,859.85
6038+500.00  0.0000  19.1130  0.00  37.47  10.00  0.00  0.00  374.71  1,263,485.14
6038+520.00  0.0000  15.5210  0.00  34.63  10.00  0.00  0.00  346.34  1,263,138.80
6038+540.00  0.0000  18.7440  0.00  34.27  10.00  0.00  0.00  342.65  1,262,796.15
6038+560.00  0.0000  12.8510  0.00  31.60  10.00  0.00  0.00  315.95  1,262,480.20
6038+580.00  0.4520  10.7530  0.45  23.60  10.00  4.52  5.88  236.04  1,262,250.03
6038+600.00  0.0000  14.4960  0.45  25.25  10.00  4.52  5.88  252.49  1,262,003.42
6038+620.00  0.0000  21.3620  0.00  35.86  10.00  0.00  0.00  358.58  1,261,644.84
6038+640.00  0.0000  23.9260  0.00  45.29  10.00  0.00  0.00  452.88  1,261,191.96
6038+660.00  0.0000  20.6650  0.00  44.59  10.00  0.00  0.00  445.91  1,260,746.05
6038+680.00  0.0000  16.8030  0.00  37.47  10.00  0.00  0.00  374.68  1,260,371.37
6038+700.00  0.0000  20.0320  0.00  36.84  10.00  0.00  0.00  368.35  1,260,003.02
6038+720.00  0.0000  29.9170  0.00  49.95  10.00  0.00  0.00  499.49  1,259,503.53
6038+740.00  0.0000  31.8530  0.00  61.77  10.00  0.00  0.00  617.70  1,258,885.83
6038+760.00  0.0000  25.6040  0.00  57.46  10.00  0.00  0.00  574.57  1,258,311.26
6038+780.00  0.0000  21.9310  0.00  47.54  10.00  0.00  0.00  475.35  1,257,835.91

274 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6038+800.00  0.0000  12.6020  0.00  34.53  10.00  0.00  0.00  345.33  1,257,490.58
6038+820.00  0.0000  23.2930  0.00  35.90  10.00  0.00  0.00  358.95  1,257,131.63
6038+840.00  0.8760  16.5460  0.88  39.84  10.00  8.76  11.39  398.39  1,256,744.63
6038+860.00  1.3970  9.1470  2.27  25.69  10.00  22.73  29.55  256.93  1,256,517.25
6038+880.00  0.6470  3.1190  2.04  12.27  10.00  20.44  26.57  122.66  1,256,421.16
6038+900.00  0.0000  22.2950  0.65  25.41  10.00  6.47  8.41  254.14  1,256,175.43
6038+920.00  0.0000  32.4630  0.00  54.76  10.00  0.00  0.00  547.58  1,255,627.85
6038+940.00  0.0000  32.7540  0.00  65.22  10.00  0.00  0.00  652.17  1,254,975.68
6038+960.00  0.0000  32.9160  0.00  65.67  10.00  0.00  0.00  656.70  1,254,318.98
6038+980.00  0.0000  30.2330  0.00  63.15  10.00  0.00  0.00  631.49  1,253,687.49
6039+000.00  0.0000  40.5440  0.00  70.78  10.00  0.00  0.00  707.77  1,252,979.72
6039+020.00  0.0000  33.5350  0.00  74.08  10.00  0.00  0.00  740.79  1,252,238.93
6039+040.00  0.0000  30.7880  0.00  64.32  10.00  0.00  0.00  643.23  1,251,595.70
6039+060.00  0.0000  28.9280  0.00  59.72  10.00  0.00  0.00  597.16  1,250,998.54
6039+080.00  0.0000  26.0520  0.00  54.98  10.00  0.00  0.00  549.80  1,250,448.74
6039+100.00  0.0000  23.9560  0.00  50.01  10.00  0.00  0.00  500.08  1,249,948.66
6039+120.00  0.0000  22.4020  0.00  46.36  10.00  0.00  0.00  463.58  1,249,485.08
6039+140.00  0.0000  21.1810  0.00  43.58  10.00  0.00  0.00  435.83  1,249,049.25
6039+160.00  0.0000  16.3220  0.00  37.50  10.00  0.00  0.00  375.03  1,248,674.22
6039+180.00  0.0000  10.9510  0.00  27.27  10.00  0.00  0.00  272.73  1,248,401.49
6039+200.00  0.0000  27.9030  0.00  38.85  10.00  0.00  0.00  388.54  1,248,012.95
6039+220.00  0.0000  35.4150  0.00  63.32  10.00  0.00  0.00  633.18  1,247,379.77
6039+240.00  0.0000  26.7060  0.00  62.12  10.00  0.00  0.00  621.21  1,246,758.56
6039+260.00  0.0000  20.0020  0.00  46.71  10.00  0.00  0.00  467.08  1,246,291.48
6039+280.00  0.0000  21.4340  0.00  41.44  10.00  0.00  0.00  414.36  1,245,877.12
6039+300.00  0.0000  21.1400  0.00  42.57  10.00  0.00  0.00  425.74  1,245,451.38
6039+320.00  0.0000  40.6180  0.00  61.76  10.00  0.00  0.00  617.58  1,244,833.80
6039+340.00  0.0000  40.9870  0.00  81.61  10.00  0.00  0.00  816.05  1,244,017.75
6039+360.00  0.0000  23.8960  0.00  64.88  10.00  0.00  0.00  648.83  1,243,368.92
6039+380.00  0.0000  16.7480  0.00  40.64  10.00  0.00  0.00  406.44  1,242,962.48
6039+400.00  0.0000  14.5380  0.00  31.29  10.00  0.00  0.00  312.86  1,242,649.62
6039+420.00  1.8530  9.5530  1.85  24.09  10.00  18.53  24.09  240.91  1,242,432.80
6039+440.00  0.0000  14.0170  1.85  23.57  10.00  18.53  24.09  235.70  1,242,221.19
6039+460.00  0.0000  24.6800  0.00  38.70  10.00  0.00  0.00  386.97  1,241,834.22
6039+480.00  0.0000  21.0150  0.00  45.70  10.00  0.00  0.00  456.95  1,241,377.27
6039+500.00  0.0000  25.6680  0.00  46.68  10.00  0.00  0.00  466.83  1,240,910.44
6039+520.00  0.0000  17.9440  0.00  43.61  10.00  0.00  0.00  436.12  1,240,474.32
6039+540.00  0.0000  17.3070  0.00  35.25  10.00  0.00  0.00  352.51  1,240,121.81
6039+560.00  0.0000  17.4100  0.00  34.72  10.00  0.00  0.00  347.17  1,239,774.64
6039+580.00  0.0000  20.0060  0.00  37.42  10.00  0.00  0.00  374.16  1,239,400.48
6039+600.00  0.0000  15.2060  0.00  35.21  10.00  0.00  0.00  352.12  1,239,048.36
6039+620.00  0.4500  9.3070  0.45  24.51  10.00  4.50  5.85  245.13  1,238,809.08
6039+640.00  10.0160  0.2080  10.47  9.52  10.00  104.66  136.06  95.15  1,238,849.99
6039+660.00  1.3590  1.8870  11.38  2.10  10.00  113.75  147.88  20.95  1,238,976.91
6039+680.00  0.0000  14.0760  1.36  15.96  10.00  13.59  17.67  159.63  1,238,834.95

275 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6039+700.00  0.0000  22.1910  0.00  36.27  10.00  0.00  0.00  362.67  1,238,472.28
6039+720.00  0.0000  35.3500  0.00  57.54  10.00  0.00  0.00  575.41  1,237,896.87
6039+722.65  0.0000  34.8590  0.00  70.21  1.33  0.00  0.00  93.17  1,237,803.70
6039+730.00  0.0000  32.6580  0.00  67.52  3.67  0.00  0.00  247.99  1,237,555.71
6039+740.00  0.0000  30.7430  0.00  63.40  5.00  0.00  0.00  317.01  1,237,238.71
6039+742.65  0.0000  31.5690  0.00  62.31  1.33  0.00  0.00  82.69  1,237,156.02
6039+750.00  0.0000  33.0630  0.00  64.63  3.67  0.00  0.00  237.39  1,236,918.63
6039+760.00  0.0000  33.7100  0.00  66.77  5.00  0.00  0.00  333.87  1,236,584.76
6039+770.00  0.0000  21.9530  0.00  55.66  5.00  0.00  0.00  278.32  1,236,306.45
6039+780.00  0.0000  16.5620  0.00  38.52  5.00  0.00  0.00  192.58  1,236,113.87
6039+790.00  0.0000  26.2280  0.00  42.79  5.00  0.00  0.00  213.95  1,235,899.92
6039+800.00  0.0000  35.6470  0.00  61.88  5.00  0.00  0.00  309.38  1,235,590.55
6039+810.00  0.0000  36.7690  0.00  72.42  5.00  0.00  0.00  362.08  1,235,228.47
6039+820.00  0.0000  35.1050  0.00  71.87  5.00  0.00  0.00  359.37  1,234,869.10
6039+830.00  0.0000  29.7370  0.00  64.84  5.00  0.00  0.00  324.21  1,234,544.89
6039+840.00  0.0000  25.9180  0.00  55.66  5.00  0.00  0.00  278.28  1,234,266.61
6039+850.00  0.0000  27.3680  0.00  53.29  5.00  0.00  0.00  266.43  1,234,000.18
6039+860.00  0.0000  28.0740  0.00  55.44  5.00  0.00  0.00  277.21  1,233,722.97
6039+870.00  0.0000  26.6200  0.00  54.69  5.00  0.00  0.00  273.47  1,233,449.50
6039+880.00  0.0000  26.3090  0.00  52.93  5.00  0.00  0.00  264.65  1,233,184.86
6039+890.00  0.0000  24.5920  0.00  50.90  5.00  0.00  0.00  254.51  1,232,930.35
6039+900.00  0.0000  21.9460  0.00  46.54  5.00  0.00  0.00  232.69  1,232,697.66
6039+910.00  0.0000  28.9380  0.00  50.88  5.00  0.00  0.00  254.42  1,232,443.24
6039+920.00  0.0000  40.3130  0.00  69.25  5.00  0.00  0.00  346.26  1,232,096.99
6039+940.00  0.0000  38.4170  0.00  78.73  10.00  0.00  0.00  787.30  1,231,309.69
6039+960.00  0.0000  25.7650  0.00  64.18  10.00  0.00  0.00  641.82  1,230,667.87
6039+980.00  0.0000  25.9890  0.00  51.75  10.00  0.00  0.00  517.54  1,230,150.33
6040+000.00  0.0000  14.7880  0.00  40.78  10.00  0.00  0.00  407.77  1,229,742.56
6040+020.00  0.0000  27.3970  0.00  42.19  10.00  0.00  0.00  421.85  1,229,320.71
6040+040.00  0.0000  37.0690  0.00  64.47  10.00  0.00  0.00  644.66  1,228,676.05
6040+060.00  0.0000  32.7940  0.00  69.86  10.00  0.00  0.00  698.63  1,227,977.42
6040+080.00  0.5670  18.5470  0.57  51.34  10.00  5.67  7.37  513.41  1,227,471.38
6040+100.00  5.0980  13.8990  5.67  32.45  10.00  56.65  73.65  324.46  1,227,220.56
6040+120.00  2.4220  17.9930  7.52  31.89  10.00  75.20  97.76  318.92  1,226,999.40
6040+140.00  1.5140  25.7750  3.94  43.77  10.00  39.36  51.17  437.68  1,226,612.89
6040+160.00  0.0000  39.1520  1.51  64.93  10.00  15.14  19.68  649.27  1,225,983.30
6040+180.00  0.0000  22.0700  0.00  61.22  10.00  0.00  0.00  612.22  1,225,371.08
6040+200.00  0.0000  17.5460  0.00  39.62  10.00  0.00  0.00  396.16  1,224,974.92
6040+220.00  0.0000  42.6840  0.00  60.23  10.00  0.00  0.00  602.30  1,224,372.62
6040+240.00  0.0000  40.2540  0.00  82.94  10.00  0.00  0.00  829.38  1,223,543.24
6040+260.00  0.0000  41.0070  0.00  81.26  10.00  0.00  0.00  812.61  1,222,730.63
6040+280.00  0.0000  44.9490  0.00  85.96  10.00  0.00  0.00  859.56  1,221,871.07
6040+300.00  0.0000  42.3580  0.00  87.31  10.00  0.00  0.00  873.07  1,220,998.00
6040+320.00  0.0000  35.6920  0.00  78.05  10.00  0.00  0.00  780.50  1,220,217.50
6040+333.37  0.0000  34.4170  0.00  70.11  6.69  0.00  0.00  468.68  1,219,748.82

276 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6040+340.00  0.0000  35.2360  0.00  69.65  3.31  0.00  0.00  230.90  1,219,517.92
6040+360.00  0.0000  40.2600  0.00  75.50  10.00  0.00  0.00  754.96  1,218,762.96
6040+380.00  0.0000  44.1730  0.00  84.43  10.00  0.00  0.00  844.33  1,217,918.63
6040+400.00  0.0000  47.1210  0.00  91.29  10.00  0.00  0.00  912.94  1,217,005.69
6040+420.00  0.0000  48.6560  0.00  95.78  10.00  0.00  0.00  957.77  1,216,047.92
6040+440.00  0.0000  52.6750  0.00  101.33  10.00  0.00  0.00  1,013.31  1,215,034.61
6040+460.00  0.0000  41.1270  0.00  93.80  10.00  0.00  0.00  938.02  1,214,096.59
6040+480.00  0.0000  35.7680  0.00  76.90  10.00  0.00  0.00  768.95  1,213,327.64
6040+483.37  0.0000  30.3770  0.00  66.15  1.69  0.00  0.00  111.49  1,213,216.16
6040+500.00  0.0000  21.8310  0.00  52.21  8.31  0.00  0.00  434.08  1,212,782.07
6040+520.00  0.0000  43.7970  0.00  65.63  10.00  0.00  0.00  656.28  1,212,125.79
6040+540.00  0.0000  40.4020  0.00  84.20  10.00  0.00  0.00  841.99  1,211,283.80
6040+560.00  0.0000  47.0470  0.00  87.45  10.00  0.00  0.00  874.49  1,210,409.31
6040+580.00  0.0000  42.7260  0.00  89.77  10.00  0.00  0.00  897.73  1,209,511.58
6040+600.00  0.0000  39.8190  0.00  82.55  10.00  0.00  0.00  825.45  1,208,686.13
6040+620.00  0.0000  34.9770  0.00  74.80  10.00  0.00  0.00  747.96  1,207,938.17
6040+640.00  0.0000  33.5230  0.00  68.50  10.00  0.00  0.00  685.00  1,207,253.17
6040+660.00  0.0000  38.4230  0.00  71.95  10.00  0.00  0.00  719.46  1,206,533.71
6040+680.00  0.0000  42.6070  0.00  81.03  10.00  0.00  0.00  810.30  1,205,723.41
6040+700.00  0.0000  54.4270  0.00  97.03  10.00  0.00  0.00  970.34  1,204,753.07
6040+720.00  0.0000  48.3120  0.00  102.74  10.00  0.00  0.00  1,027.39  1,203,725.68
6040+740.00  0.0000  46.6440  0.00  94.96  10.00  0.00  0.00  949.56  1,202,776.12
6040+760.00  0.0000  34.5350  0.00  81.18  10.00  0.00  0.00  811.79  1,201,964.33
6040+780.00  0.0000  44.7670  0.00  79.30  10.00  0.00  0.00  793.02  1,201,171.31
6040+781.48  0.0000  45.7950  0.00  90.56  0.74  0.00  0.00  67.02  1,201,104.30
6040+800.00  0.0000  52.6810  0.00  98.48  9.26  0.00  0.00  911.89  1,200,192.41
6040+820.00  0.0000  35.7200  0.00  88.40  10.00  0.00  0.00  884.01  1,199,308.40
6040+840.00  0.0000  27.5250  0.00  63.25  10.00  0.00  0.00  632.45  1,198,675.95
6040+860.00  0.0000  34.7680  0.00  62.29  10.00  0.00  0.00  622.93  1,198,053.02
6040+880.00  0.0000  39.6840  0.00  74.45  10.00  0.00  0.00  744.52  1,197,308.50
6040+900.00  0.0000  43.1720  0.00  82.86  10.00  0.00  0.00  828.56  1,196,479.94
6040+920.00  0.0000  39.7260  0.00  82.90  10.00  0.00  0.00  828.98  1,195,650.96
6040+931.48  0.0000  35.2850  0.00  75.01  5.74  0.00  0.00  430.56  1,195,220.40
6040+940.00  0.0000  31.8920  0.00  67.18  4.26  0.00  0.00  286.17  1,194,934.22
6040+960.00  0.0000  36.4780  0.00  68.37  10.00  0.00  0.00  683.70  1,194,250.52
6040+980.00  0.0000  46.5210  0.00  83.00  10.00  0.00  0.00  829.99  1,193,420.53
6041+000.00  0.0000  45.8060  0.00  92.33  10.00  0.00  0.00  923.27  1,192,497.26
6041+020.00  0.0000  45.1240  0.00  90.93  10.00  0.00  0.00  909.30  1,191,587.96
6041+040.00  0.0000  57.8090  0.00  102.93  10.00  0.00  0.00  1,029.33  1,190,558.63
6041+060.00  0.0000  62.4450  0.00  120.25  10.00  0.00  0.00  1,202.54  1,189,356.09
6041+080.00  0.0000  48.5200  0.00  110.97  10.00  0.00  0.00  1,109.65  1,188,246.44
6041+100.00  0.0000  62.5430  0.00  111.06  10.00  0.00  0.00  1,110.63  1,187,135.81
6041+120.00  0.0000  45.3980  0.00  107.94  10.00  0.00  0.00  1,079.41  1,186,056.40
6041+140.00  0.0000  48.9620  0.00  94.36  10.00  0.00  0.00  943.60  1,185,112.80
6041+160.00  0.0000  46.0430  0.00  95.01  10.00  0.00  0.00  950.05  1,184,162.75

277 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6041+180.00  0.0000  48.9570  0.00  95.00  10.00  0.00  0.00  950.00  1,183,212.75
6041+200.00  0.0000  52.5160  0.00  101.47  10.00  0.00  0.00  1,014.73  1,182,198.02
6041+220.00  0.0000  62.1670  0.00  114.68  10.00  0.00  0.00  1,146.83  1,181,051.19
6041+240.00  0.0000  56.6810  0.00  118.85  10.00  0.00  0.00  1,188.48  1,179,862.71
6041+260.00  0.0000  42.3090  0.00  98.99  10.00  0.00  0.00  989.90  1,178,872.81
6041+280.00  0.0000  57.7800  0.00  100.09  10.00  0.00  0.00  1,000.89  1,177,871.92
6041+300.00  0.0000  50.2770  0.00  108.06  10.00  0.00  0.00  1,080.57  1,176,791.35
6041+320.00  0.0000  51.5030  0.00  101.78  10.00  0.00  0.00  1,017.80  1,175,773.55
6041+340.00  0.0000  62.0360  0.00  113.54  10.00  0.00  0.00  1,135.39  1,174,638.16
6041+360.00  0.0000  52.8020  0.00  114.84  10.00  0.00  0.00  1,148.38  1,173,489.78
6041+380.00  0.0000  69.7860  0.00  122.59  10.00  0.00  0.00  1,225.88  1,172,263.90
6041+390.00  0.0000  58.7000  0.00  128.49  5.00  0.00  0.00  642.43  1,171,621.47
6041+400.00  0.0000  47.6870  0.00  106.39  5.00  0.00  0.00  531.94  1,171,089.54
6041+410.00  0.0000  53.1750  0.00  100.86  5.00  0.00  0.00  504.31  1,170,585.23
6041+420.00  0.0000  57.2610  0.00  110.44  5.00  0.00  0.00  552.18  1,170,033.05
6041+430.00  0.0000  61.6150  0.00  118.88  5.00  0.00  0.00  594.38  1,169,438.67
6041+440.00  0.0000  65.6160  0.00  127.23  5.00  0.00  0.00  636.16  1,168,802.51
6041+450.00  0.0000  61.5140  0.00  127.13  5.00  0.00  0.00  635.65  1,168,166.86
6041+460.00  0.0000  62.4580  0.00  123.97  5.00  0.00  0.00  619.86  1,167,547.00
6041+470.00  0.0000  62.2890  0.00  124.75  5.00  0.00  0.00  623.74  1,166,923.27
6041+480.00  0.0000  60.3790  0.00  122.67  5.00  0.00  0.00  613.34  1,166,309.93
6041+490.00  0.0000  50.0170  0.00  110.40  5.00  0.00  0.00  551.98  1,165,757.95
6041+500.00  0.0000  41.9230  0.00  91.94  5.00  0.00  0.00  459.70  1,165,298.25
6041+510.00  0.0000  42.6180  0.00  84.54  5.00  0.00  0.00  422.71  1,164,875.54
6041+520.00  0.0000  44.5420  0.00  87.16  5.00  0.00  0.00  435.80  1,164,439.74
6041+530.00  0.0000  49.3790  0.00  93.92  5.00  0.00  0.00  469.61  1,163,970.14
6041+540.00  0.0000  51.2530  0.00  100.63  5.00  0.00  0.00  503.16  1,163,466.98
6041+550.00  0.0000  46.2120  0.00  97.47  5.00  0.00  0.00  487.33  1,162,979.65
6041+560.00  0.0000  40.6870  0.00  86.90  5.00  0.00  0.00  434.50  1,162,545.16
6041+564.54  0.0000  38.9090  0.00  79.60  2.27  0.00  0.00  180.84  1,162,364.31
6041+570.00  0.0000  35.6840  0.00  74.59  2.73  0.00  0.00  203.49  1,162,160.82
6041+580.00  0.0000  30.8840  0.00  66.57  5.00  0.00  0.00  332.84  1,161,827.98
6041+584.54  0.0000  32.1220  0.00  63.01  2.27  0.00  0.00  143.15  1,161,684.83
6041+600.00  0.0000  36.5630  0.00  68.69  7.73  0.00  0.00  530.80  1,161,154.04
6041+620.00  0.0000  48.9810  0.00  85.54  10.00  0.00  0.00  855.44  1,160,298.60
6041+640.00  0.0000  58.4370  0.00  107.42  10.00  0.00  0.00  1,074.18  1,159,224.42
6041+660.00  0.0000  57.9800  0.00  116.42  10.00  0.00  0.00  1,164.17  1,158,060.25
6041+680.00  0.0000  28.5640  0.00  86.54  10.00  0.00  0.00  865.44  1,157,194.81
6041+700.00  0.0000  18.1490  0.00  46.71  10.00  0.00  0.00  467.13  1,156,727.68
6041+720.00  0.0000  34.4800  0.00  52.63  10.00  0.00  0.00  526.29  1,156,201.39
6041+740.00  0.0000  31.6640  0.00  66.14  10.00  0.00  0.00  661.44  1,155,539.95
6041+760.00  0.0000  49.5260  0.00  81.19  10.00  0.00  0.00  811.90  1,154,728.05
6041+780.00  0.0000  49.8960  0.00  99.42  10.00  0.00  0.00  994.22  1,153,733.83
6041+800.00  0.0000  55.3310  0.00  105.23  10.00  0.00  0.00  1,052.27  1,152,681.56
6041+820.00  0.0000  51.9770  0.00  107.31  10.00  0.00  0.00  1,073.08  1,151,608.48

278 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6041+840.00  0.0000  41.3410  0.00  93.32  10.00  0.00  0.00  933.18  1,150,675.30
6041+860.00  0.0000  24.2310  0.00  65.57  10.00  0.00  0.00  655.72  1,150,019.58
6041+880.00  0.0000  19.3770  0.00  43.61  10.00  0.00  0.00  436.08  1,149,583.50
6041+900.00  0.0000  45.1880  0.00  64.57  10.00  0.00  0.00  645.65  1,148,937.85
6041+920.00  0.0000  40.0920  0.00  85.28  10.00  0.00  0.00  852.80  1,148,085.05
6041+940.00  0.0000  40.7380  0.00  80.83  10.00  0.00  0.00  808.30  1,147,276.75
6041+960.00  0.0000  26.4170  0.00  67.16  10.00  0.00  0.00  671.55  1,146,605.20
6041+980.00  0.4870  8.4680  0.49  34.89  10.00  4.87  6.33  348.85  1,146,262.68
6042+000.00  0.0000  39.5020  0.49  47.97  10.00  4.87  6.33  479.70  1,145,789.31
6042+020.00  0.0000  32.3200  0.00  71.82  10.00  0.00  0.00  718.22  1,145,071.09
6042+040.00  0.0000  21.4130  0.00  53.73  10.00  0.00  0.00  537.33  1,144,533.76
6042+060.00  0.5720  15.4640  0.57  36.88  10.00  5.72  7.44  368.77  1,144,172.43
6042+080.00  0.0000  21.3400  0.57  36.80  10.00  5.72  7.44  368.04  1,143,811.82
6042+100.00  0.0000  37.1110  0.00  58.45  10.00  0.00  0.00  584.51  1,143,227.31
6042+120.00  0.0000  43.9080  0.00  81.02  10.00  0.00  0.00  810.19  1,142,417.12
6042+140.00  1.3680  12.6380  1.37  56.55  10.00  13.68  17.78  565.46  1,141,869.45
6042+160.00  10.5830  0.4860  11.95  13.12  10.00  119.51  155.36  131.24  1,141,893.57
6042+180.00  18.2450  0.2180  28.83  0.70  10.00  288.28  374.76  7.04  1,142,261.29
6042+200.00  5.1350  0.3360  23.38  0.55  10.00  233.80  303.94  5.54  1,142,559.69
6042+220.00  0.0000  16.8820  5.14  17.22  10.00  51.35  66.76  172.18  1,142,454.27
6042+240.00  0.0000  30.8090  0.00  47.69  10.00  0.00  0.00  476.91  1,141,977.36
6042+260.00  0.0000  36.8450  0.00  67.65  10.00  0.00  0.00  676.54  1,141,300.82
6042+280.00  0.0000  35.7710  0.00  72.62  10.00  0.00  0.00  726.16  1,140,574.66
6042+300.00  0.0000  25.9000  0.00  61.67  10.00  0.00  0.00  616.71  1,139,957.95
6042+320.00  0.0000  29.2830  0.00  55.18  10.00  0.00  0.00  551.83  1,139,406.12
6042+340.00  1.6810  0.7610  1.68  30.04  10.00  16.81  21.85  300.44  1,139,127.53
6042+360.00  0.8180  1.9630  2.50  2.72  10.00  24.99  32.49  27.24  1,139,132.78
6042+380.00  0.0000  32.1800  0.82  34.14  10.00  8.18  10.63  341.43  1,138,801.98
6042+400.00  0.0000  19.0620  0.00  51.24  10.00  0.00  0.00  512.42  1,138,289.56
6042+420.00  0.0000  18.7560  0.00  37.82  10.00  0.00  0.00  378.18  1,137,911.38
6042+440.00  0.0000  30.4100  0.00  49.17  10.00  0.00  0.00  491.66  1,137,419.72
6042+460.00  0.0000  28.6770  0.00  59.09  10.00  0.00  0.00  590.87  1,136,828.85
6042+480.00  0.0000  39.0900  0.00  67.77  10.00  0.00  0.00  677.67  1,136,151.18
6042+500.00  0.0000  40.0090  0.00  79.10  10.00  0.00  0.00  790.99  1,135,360.19
6042+520.00  0.0000  30.9830  0.00  70.99  10.00  0.00  0.00  709.92  1,134,650.27
6042+540.00  0.0000  27.8780  0.00  58.86  10.00  0.00  0.00  588.61  1,134,061.66
6042+560.00  0.0000  28.0580  0.00  55.94  10.00  0.00  0.00  559.36  1,133,502.30
6042+580.00  0.0000  35.5650  0.00  63.62  10.00  0.00  0.00  636.23  1,132,866.07
6042+600.00  0.0000  42.9900  0.00  78.56  10.00  0.00  0.00  785.55  1,132,080.52
6042+620.00  0.0000  39.1530  0.00  82.14  10.00  0.00  0.00  821.43  1,131,259.09
6042+640.00  0.0000  41.2090  0.00  80.36  10.00  0.00  0.00  803.62  1,130,455.47
6042+660.00  0.0000  35.2170  0.00  76.43  10.00  0.00  0.00  764.26  1,129,691.21
6042+680.00  0.0000  46.6230  0.00  81.84  10.00  0.00  0.00  818.40  1,128,872.81
6042+700.00  0.0000  26.2310  0.00  72.85  10.00  0.00  0.00  728.54  1,128,144.27
6042+720.00  0.0000  31.7500  0.00  57.98  10.00  0.00  0.00  579.81  1,127,564.46

279 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6042+740.00  0.0000  49.3880  0.00  81.14  10.00  0.00  0.00  811.38  1,126,753.08
6042+760.00  0.0000  35.6770  0.00  85.07  10.00  0.00  0.00  850.65  1,125,902.43
6042+780.00  0.0000  22.7890  0.00  58.47  10.00  0.00  0.00  584.66  1,125,317.77
6042+800.00  0.0000  32.6060  0.00  55.40  10.00  0.00  0.00  553.95  1,124,763.82
6042+820.00  0.0000  28.3370  0.00  60.94  10.00  0.00  0.00  609.43  1,124,154.39
6042+840.00  0.0000  34.7800  0.00  63.12  10.00  0.00  0.00  631.17  1,123,523.22
6042+860.00  0.0000  32.1820  0.00  66.96  10.00  0.00  0.00  669.62  1,122,853.60
6042+880.00  0.0000  17.1690  0.00  49.35  10.00  0.00  0.00  493.51  1,122,360.09
6042+900.00  0.0000  31.3210  0.00  48.49  10.00  0.00  0.00  484.90  1,121,875.19
6042+920.00  0.0000  28.7580  0.00  60.08  10.00  0.00  0.00  600.79  1,121,274.40
6042+940.00  0.0000  31.1270  0.00  59.89  10.00  0.00  0.00  598.85  1,120,675.55
6042+960.00  0.0000  33.5270  0.00  64.65  10.00  0.00  0.00  646.54  1,120,029.01
6042+980.00  0.0000  23.7970  0.00  57.32  10.00  0.00  0.00  573.24  1,119,455.77
6043+000.00  0.0000  24.4960  0.00  48.29  10.00  0.00  0.00  482.93  1,118,972.84
6043+020.00  0.3440  11.3830  0.34  35.88  10.00  3.44  4.47  358.79  1,118,618.52
6043+040.00  1.9560  0.7110  2.30  12.09  10.00  23.00  29.90  120.94  1,118,527.48
6043+060.00  0.0000  33.1460  1.96  33.86  10.00  19.56  25.43  338.57  1,118,214.34
6043+080.00  0.0000  24.0540  0.00  57.20  10.00  0.00  0.00  572.00  1,117,642.34
6043+100.00  0.0000  34.6260  0.00  58.68  10.00  0.00  0.00  586.80  1,117,055.54
6043+120.00  0.0000  23.1730  0.00  57.80  10.00  0.00  0.00  577.99  1,116,477.55
6043+140.00  0.0000  27.7110  0.00  50.88  10.00  0.00  0.00  508.84  1,115,968.71
6043+160.00  0.0000  35.0110  0.00  62.72  10.00  0.00  0.00  627.22  1,115,341.49
6043+180.00  0.0000  37.3050  0.00  72.32  10.00  0.00  0.00  723.16  1,114,618.33
6043+200.00  0.0000  38.9830  0.00  76.29  10.00  0.00  0.00  762.88  1,113,855.45
6043+220.00  0.0000  38.6200  0.00  77.60  10.00  0.00  0.00  776.03  1,113,079.42
6043+240.00  0.0000  29.4500  0.00  68.07  10.00  0.00  0.00  680.70  1,112,398.72
6043+260.00  0.0000  21.7380  0.00  51.19  10.00  0.00  0.00  511.88  1,111,886.84
6043+280.00  0.0000  24.4690  0.00  46.21  10.00  0.00  0.00  462.07  1,111,424.77
6043+300.00  0.0000  16.6900  0.00  41.16  10.00  0.00  0.00  411.59  1,111,013.18
6043+320.00  0.0000  20.3630  0.00  37.05  10.00  0.00  0.00  370.53  1,110,642.65
6043+340.00  0.0000  23.5460  0.00  43.91  10.00  0.00  0.00  439.09  1,110,203.56
6043+360.00  0.0000  29.5900  0.00  53.14  10.00  0.00  0.00  531.36  1,109,672.20
6043+380.00  0.0000  22.4100  0.00  52.00  10.00  0.00  0.00  520.00  1,109,152.20
6043+400.00  0.0000  28.4270  0.00  50.84  10.00  0.00  0.00  508.37  1,108,643.83
6043+420.00  0.0000  40.2460  0.00  68.67  10.00  0.00  0.00  686.73  1,107,957.10
6043+440.00  0.0000  36.0630  0.00  76.31  10.00  0.00  0.00  763.09  1,107,194.01
6043+460.00  0.0000  30.5480  0.00  66.61  10.00  0.00  0.00  666.11  1,106,527.90
6043+480.00  0.0000  36.0780  0.00  66.63  10.00  0.00  0.00  666.26  1,105,861.64
6043+500.00  0.0000  41.3920  0.00  77.47  10.00  0.00  0.00  774.70  1,105,086.94
6043+520.00  0.0000  41.0580  0.00  82.45  10.00  0.00  0.00  824.50  1,104,262.44
6043+540.00  0.0000  44.4260  0.00  85.48  10.00  0.00  0.00  854.84  1,103,407.60
6043+560.00  0.0000  41.0930  0.00  85.52  10.00  0.00  0.00  855.19  1,102,552.41
6043+580.00  0.0000  42.3790  0.00  83.47  10.00  0.00  0.00  834.72  1,101,717.69
6043+600.00  0.0000  39.3930  0.00  81.77  10.00  0.00  0.00  817.72  1,100,899.97
6043+620.00  0.0000  38.8800  0.00  78.27  10.00  0.00  0.00  782.73  1,100,117.24

280 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6043+640.00  0.0000  35.9020  0.00  74.78  10.00  0.00  0.00  747.82  1,099,369.42
6043+660.00  0.0000  19.3410  0.00  55.24  10.00  0.00  0.00  552.43  1,098,816.99
6043+680.00  0.0000  24.4190  0.00  43.76  10.00  0.00  0.00  437.60  1,098,379.39
6043+700.00  1.3170  5.3880  1.32  29.81  10.00  13.17  17.12  298.07  1,098,098.44
6043+720.00  0.0000  22.0110  1.32  27.40  10.00  13.17  17.12  273.99  1,097,841.57
6043+740.00  0.0000  36.5020  0.00  58.51  10.00  0.00  0.00  585.13  1,097,256.44
6043+760.00  0.0000  39.7530  0.00  76.26  10.00  0.00  0.00  762.55  1,096,493.89
6043+780.00  0.0000  36.0910  0.00  75.84  10.00  0.00  0.00  758.44  1,095,735.45
6043+800.00  0.0000  31.2430  0.00  67.33  10.00  0.00  0.00  673.34  1,095,062.11
6043+820.00  0.0000  29.6900  0.00  60.93  10.00  0.00  0.00  609.33  1,094,452.78
6043+840.00  0.0000  38.0270  0.00  67.72  10.00  0.00  0.00  677.17  1,093,775.61
6043+860.00  0.0000  27.6330  0.00  65.66  10.00  0.00  0.00  656.60  1,093,119.01
6043+880.00  0.0000  30.9880  0.00  58.62  10.00  0.00  0.00  586.21  1,092,532.80
6043+900.00  0.0000  35.6410  0.00  66.63  10.00  0.00  0.00  666.29  1,091,866.51
6043+920.00  0.0000  37.2800  0.00  72.92  10.00  0.00  0.00  729.21  1,091,137.30
6043+940.00  0.0000  28.0290  0.00  65.31  10.00  0.00  0.00  653.09  1,090,484.21
6043+960.00  0.0000  31.5720  0.00  59.60  10.00  0.00  0.00  596.01  1,089,888.20
6043+980.00  0.0000  31.0410  0.00  62.61  10.00  0.00  0.00  626.13  1,089,262.07
6044+000.00  0.0000  37.8700  0.00  68.91  10.00  0.00  0.00  689.11  1,088,572.96
6044+020.00  0.0000  35.7390  0.00  73.61  10.00  0.00  0.00  736.09  1,087,836.87
6044+040.00  0.0000  40.5110  0.00  76.25  10.00  0.00  0.00  762.50  1,087,074.37
6044+060.00  0.0000  49.3250  0.00  89.84  10.00  0.00  0.00  898.36  1,086,176.01
6044+080.00  0.0000  31.1210  0.00  80.45  10.00  0.00  0.00  804.46  1,085,371.55
6044+100.00  0.0000  24.1620  0.00  55.28  10.00  0.00  0.00  552.83  1,084,818.72
6044+120.00  0.0000  28.5590  0.00  52.72  10.00  0.00  0.00  527.21  1,084,291.51
6044+140.00  0.0000  16.4050  0.00  44.96  10.00  0.00  0.00  449.64  1,083,841.87
6044+160.00  0.0000  34.1990  0.00  50.60  10.00  0.00  0.00  506.04  1,083,335.83
6044+180.00  0.0000  25.3070  0.00  59.51  10.00  0.00  0.00  595.06  1,082,740.77
6044+185.00  0.0000  21.5400  0.00  46.85  2.50  0.00  0.00  117.12  1,082,623.66
6044+185.00  0.0000  21.7310  0.00  43.27  0.00  0.00  0.00  0.00  1,082,623.66
6044+200.00  0.0000  17.6930  0.00  39.42  7.50  0.00  0.00  295.68  1,082,327.98
6044+220.00  0.0000  33.0110  0.00  50.70  10.00  0.00  0.00  507.04  1,081,820.94
6044+240.00  0.0000  33.8510  0.00  66.86  10.00  0.00  0.00  668.62  1,081,152.32
6044+260.00  0.0000  27.6130  0.00  61.46  10.00  0.00  0.00  614.64  1,080,537.68
6044+280.00  0.0000  32.3360  0.00  59.95  10.00  0.00  0.00  599.49  1,079,938.19
6044+300.00  0.0000  28.6600  0.00  61.00  10.00  0.00  0.00  609.96  1,079,328.23
6044+320.00  0.0000  27.7730  0.00  56.43  10.00  0.00  0.00  564.33  1,078,763.90
6044+320.00  0.0000  27.7730  0.00  55.55  0.00  0.00  0.00  0.00  1,078,763.90
6044+340.00  0.0000  17.4640  0.00  45.24  10.00  0.00  0.00  452.37  1,078,311.53
6044+360.00  0.0000  22.0250  0.00  39.49  10.00  0.00  0.00  394.89  1,077,916.64
6044+370.00  0.0000  22.1210  0.00  44.15  5.00  0.00  0.00  220.73  1,077,695.91
6044+380.00  0.0000  0.0060  0.00  22.13  5.00  0.00  0.00  110.64  1,077,585.27
6044+400.00  0.0020  0.0040  0.00  0.01  10.00  0.02  0.03  0.10  1,077,585.20
6044+420.00  0.0000  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,585.14
6044+440.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,585.06

281 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6044+460.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,585.00
6044+480.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,584.94
6044+500.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,584.87
6044+520.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,584.79
6044+540.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  1,077,584.70
6044+560.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  1,077,584.61
6044+580.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,584.53
6044+600.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,584.47
6044+620.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,584.40
6044+640.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  1,077,584.31
6044+660.00  0.0020  0.0040  0.00  0.01  10.00  0.02  0.03  0.09  1,077,584.25
6044+680.00  0.0010  0.0040  0.00  0.01  10.00  0.03  0.04  0.08  1,077,584.21
6044+700.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,584.15
6044+720.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,584.08
6044+740.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,584.00
6044+760.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,583.92
6044+780.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,583.86
6044+800.00  0.0030  0.0040  0.00  0.01  10.00  0.04  0.05  0.08  1,077,583.83
6044+820.00  0.0000  0.0040  0.00  0.01  10.00  0.03  0.04  0.08  1,077,583.79
6044+840.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,583.71
6044+860.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,583.63
6044+880.00  0.0020  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,583.57
6044+900.00  0.0010  0.0040  0.00  0.01  10.00  0.03  0.04  0.08  1,077,583.53
6044+920.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,583.47
6044+940.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,583.39
6044+960.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,583.31
6044+980.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  1,077,583.22
6045+000.00  0.0020  0.0040  0.00  0.01  10.00  0.02  0.03  0.09  1,077,583.15
6045+020.00  0.0000  0.0050  0.00  0.01  10.00  0.02  0.03  0.09  1,077,583.09
6045+040.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  1,077,582.99
6045+060.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  1,077,582.89
6045+080.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  1,077,582.80
6045+100.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,582.73
6045+120.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,582.66
6045+140.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,582.58
6045+160.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,582.52
6045+180.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  1,077,582.44
6045+200.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  1,077,582.34
6045+220.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  1,077,582.25
6045+240.00  0.0010  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  1,077,582.17
6045+260.00  0.0010  0.0050  0.00  0.01  10.00  0.02  0.03  0.10  1,077,582.10
6045+280.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.10  1,077,582.01
6045+300.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  1,077,581.92
6045+320.00  0.0010  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  1,077,581.85
6045+340.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  1,077,581.77

282 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6045+360.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,581.70
6045+380.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,581.63
6045+400.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,581.55
6045+420.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,581.49
6045+440.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,581.42
6045+460.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,581.34
6045+480.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,581.26
6045+500.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,581.18
6045+520.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,581.10
6045+540.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,581.02
6045+560.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,580.95
6045+580.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,580.89
6045+600.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,580.81
6045+620.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,580.74
6045+640.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,580.67
6045+660.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  1,077,580.58
6045+680.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  1,077,580.48
6045+700.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  1,077,580.38
6045+720.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  1,077,580.31
6045+740.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  1,077,580.23
6045+760.00  0.0010  0.0050  0.00  0.01  10.00  0.01  0.01  0.10  1,077,580.14
6045+780.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  1,077,580.06
6045+800.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,580.00
6045+820.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.93
6045+840.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,579.85
6045+860.00  0.0020  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,579.80
6045+880.00  0.0000  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,579.74
6045+900.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.68
6045+920.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.61
6045+940.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.54
6045+960.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.47
6045+980.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.41
6046+000.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,579.35
6046+020.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.29
6046+040.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,579.21
6046+060.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.14
6046+080.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.07
6046+100.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,579.01
6046+120.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  1,077,578.93
6046+140.00  0.0010  0.0050  0.00  0.01  10.00  0.01  0.01  0.10  1,077,578.84
6046+160.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  1,077,578.76
6046+180.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.09  1,077,578.67
6046+200.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  1,077,578.60
6046+220.00  0.0020  0.0040  0.00  0.01  10.00  0.03  0.04  0.08  1,077,578.56
6046+240.00  0.0000  0.0050  0.00  0.01  10.00  0.02  0.03  0.09  1,077,578.49

283 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6046+260.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.09  1,077,578.40
6046+280.00  0.0000  0.0060  0.00  0.01  10.00  0.00  0.00  0.10  1,077,578.30
6046+300.00  0.0010  0.0050  0.00  0.01  10.00  0.01  0.01  0.11  1,077,578.21
6046+320.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  1,077,578.13
6046+340.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,578.05
6046+360.00  0.0010  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  1,077,577.97
6046+380.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  1,077,577.89
6046+400.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,577.83
6046+420.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,577.76
6046+440.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,577.69
6046+460.00  0.0020  0.0040  0.00  0.01  10.00  0.03  0.04  0.08  1,077,577.65
6046+480.00  0.0000  0.0050  0.00  0.01  10.00  0.02  0.03  0.09  1,077,577.59
6046+500.00  0.0000  0.0050  0.00  0.01  10.00  0.00  0.00  0.10  1,077,577.49
6046+520.00  0.0020  0.0040  0.00  0.01  10.00  0.02  0.03  0.09  1,077,577.42
6046+540.00  0.0000  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,577.37
6046+560.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,577.30
6046+580.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,577.24
6046+600.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,577.17
6046+620.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  1,077,577.09
6046+640.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.09  1,077,577.02
6046+660.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,576.96
6046+680.00  0.0000  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,576.89
6046+700.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,576.83
6046+720.00  0.0000  0.0060  0.00  0.01  10.00  0.01  0.01  0.10  1,077,576.74
6046+740.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.10  1,077,576.64
6046+760.00  0.0000  0.0040  0.00  0.01  10.00  0.00  0.00  0.08  1,077,576.56
6046+780.00  0.0010  0.0040  0.00  0.01  10.00  0.01  0.01  0.08  1,077,576.49
6046+800.00  0.0010  0.0040  0.00  0.01  10.00  0.02  0.03  0.08  1,077,576.44
6046+820.00  0.0000  0.0050  0.00  0.01  10.00  0.01  0.01  0.09  1,077,576.36
6046+840.00  0.0000  28.0620  0.00  28.07  10.00  0.00  0.00  280.67  1,077,295.69
6046+860.00  0.2760  10.7150  0.28  38.78  10.00  2.76  3.59  387.77  1,076,911.51
6046+880.00  0.0000  40.9420  0.28  51.66  10.00  2.76  3.59  516.57  1,076,398.53
6046+900.00  0.0000  28.1880  0.00  69.13  10.00  0.00  0.00  691.30  1,075,707.23
6046+920.00  0.0000  26.2620  0.00  54.45  10.00  0.00  0.00  544.50  1,075,162.73
6046+940.00  0.0000  44.8870  0.00  71.15  10.00  0.00  0.00  711.49  1,074,451.24
6046+960.00  0.0000  46.0380  0.00  90.93  10.00  0.00  0.00  909.25  1,073,541.99
6046+980.00  0.0000  51.4790  0.00  97.52  10.00  0.00  0.00  975.17  1,072,566.82
6047+000.00  0.0000  30.2820  0.00  81.76  10.00  0.00  0.00  817.61  1,071,749.21
6047+000.00  0.0000  31.2890  0.00  61.57  0.00  0.00  0.00  0.00  1,071,749.21
6047+020.00  0.0000  30.0130  0.00  61.30  10.00  0.00  0.00  613.02  1,071,136.19
6047+040.00  0.0000  38.4010  0.00  68.41  10.00  0.00  0.00  684.14  1,070,452.05
6047+060.00  0.0000  29.8100  0.00  68.21  10.00  0.00  0.00  682.11  1,069,769.94
6047+060.00  0.0000  29.8100  0.00  59.62  0.00  0.00  0.00  0.00  1,069,769.94
6047+080.00  0.0000  42.6670  0.00  72.48  10.00  0.00  0.00  724.77  1,069,045.17
6047+100.00  0.0000  28.0530  0.00  70.72  10.00  0.00  0.00  707.20  1,068,337.97

284 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6047+120.00  0.0000  28.1490  0.00  56.20  10.00  0.00  0.00  562.02  1,067,775.95
6047+140.00  0.0000  40.8260  0.00  68.98  10.00  0.00  0.00  689.75  1,067,086.20
6047+160.00  0.0000  39.1440  0.00  79.97  10.00  0.00  0.00  799.70  1,066,286.50
6047+180.00  0.0000  34.4440  0.00  73.59  10.00  0.00  0.00  735.88  1,065,550.62
6047+200.00  0.0000  27.4040  0.00  61.85  10.00  0.00  0.00  618.48  1,064,932.14
6047+220.00  0.0000  44.7830  0.00  72.19  10.00  0.00  0.00  721.87  1,064,210.27
6047+240.00  0.0000  44.5730  0.00  89.36  10.00  0.00  0.00  893.56  1,063,316.71
6047+260.00  0.0000  34.9650  0.00  79.54  10.00  0.00  0.00  795.38  1,062,521.33
6047+280.00  0.0000  32.6680  0.00  67.63  10.00  0.00  0.00  676.33  1,061,845.00
6047+300.00  0.0000  30.8900  0.00  63.56  10.00  0.00  0.00  635.58  1,061,209.42
6047+320.00  0.0000  33.5620  0.00  64.45  10.00  0.00  0.00  644.52  1,060,564.90
6047+340.00  0.0000  30.0500  0.00  63.61  10.00  0.00  0.00  636.12  1,059,928.78
6047+360.00  0.0000  36.0200  0.00  66.07  10.00  0.00  0.00  660.70  1,059,268.08
6047+380.00  0.0000  26.0130  0.00  62.03  10.00  0.00  0.00  620.33  1,058,647.75
6047+400.00  0.0000  17.2720  0.00  43.29  10.00  0.00  0.00  432.85  1,058,214.90
6047+420.00  0.0000  16.5650  0.00  33.84  10.00  0.00  0.00  338.37  1,057,876.53
6047+440.00  0.0000  35.5030  0.00  52.07  10.00  0.00  0.00  520.68  1,057,355.85
6047+460.00  0.0000  31.2810  0.00  66.78  10.00  0.00  0.00  667.84  1,056,688.01
6047+480.00  0.0000  10.8110  0.00  42.09  10.00  0.00  0.00  420.92  1,056,267.09
6047+500.00  0.0000  8.8540  0.00  19.67  10.00  0.00  0.00  196.65  1,056,070.44
6047+510.00  0.0000  18.2140  0.00  27.07  5.00  0.00  0.00  135.34  1,055,935.10
6047+510.00  0.0000  16.3800  0.00  34.59  0.00  0.00  0.00  0.00  1,055,935.10
6047+520.00  0.0000  29.7090  0.00  46.09  5.00  0.00  0.00  230.45  1,055,704.65
6047+540.00  0.0000  18.9350  0.00  48.64  10.00  0.00  0.00  486.44  1,055,218.21
6047+560.00  0.0000  20.1010  0.00  39.04  10.00  0.00  0.00  390.36  1,054,827.85
6047+580.00  0.0000  28.5640  0.00  48.67  10.00  0.00  0.00  486.65  1,054,341.20
6047+580.00  0.0000  28.7620  0.00  57.33  0.00  0.00  0.00  0.00  1,054,341.20
6047+600.00  0.0000  17.7420  0.00  46.50  10.00  0.00  0.00  465.04  1,053,876.16
6047+620.00  0.6890  18.0260  0.69  35.77  10.00  6.89  8.96  357.68  1,053,527.44
6047+640.00  0.0000  28.3610  0.69  46.39  10.00  6.89  8.96  463.87  1,053,072.53
6047+660.00  0.0000  25.6960  0.00  54.06  10.00  0.00  0.00  540.57  1,052,531.96
6047+680.00  0.0000  27.5740  0.00  53.27  10.00  0.00  0.00  532.70  1,051,999.26
6047+700.00  0.0000  26.7030  0.00  54.28  10.00  0.00  0.00  542.77  1,051,456.49
6047+720.00  0.0000  22.4490  0.00  49.15  10.00  0.00  0.00  491.52  1,050,964.97
6047+740.00  0.0000  14.7650  0.00  37.21  10.00  0.00  0.00  372.14  1,050,592.83
6047+760.00  0.0000  27.2390  0.00  42.00  10.00  0.00  0.00  420.04  1,050,172.79
6047+780.00  0.0000  14.4230  0.00  41.66  10.00  0.00  0.00  416.62  1,049,756.17
6047+800.00  0.0000  23.6340  0.00  38.06  10.00  0.00  0.00  380.57  1,049,375.60
6047+820.00  0.0000  20.1680  0.00  43.80  10.00  0.00  0.00  438.02  1,048,937.58
6047+840.00  0.0000  30.4000  0.00  50.57  10.00  0.00  0.00  505.68  1,048,431.90
6047+860.00  0.0000  27.7990  0.00  58.20  10.00  0.00  0.00  581.99  1,047,849.91
6047+880.00  0.0000  32.8070  0.00  60.61  10.00  0.00  0.00  606.06  1,047,243.85
6047+900.00  0.0000  31.9890  0.00  64.80  10.00  0.00  0.00  647.96  1,046,595.89
6047+920.00  0.0000  35.0640  0.00  67.05  10.00  0.00  0.00  670.53  1,045,925.36
6047+940.00  0.0000  43.7100  0.00  78.77  10.00  0.00  0.00  787.74  1,045,137.62

285 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6047+960.00  0.0000  35.0120  0.00  78.72  10.00  0.00  0.00  787.22  1,044,350.40
6047+980.00  0.0000  36.0560  0.00  71.07  10.00  0.00  0.00  710.68  1,043,639.72
6048+000.00  0.0000  34.9120  0.00  70.97  10.00  0.00  0.00  709.68  1,042,930.04
6048+020.00  0.0000  40.1340  0.00  75.05  10.00  0.00  0.00  750.46  1,042,179.58
6048+040.00  0.0000  49.3370  0.00  89.47  10.00  0.00  0.00  894.71  1,041,284.87
6048+060.00  0.0000  55.3590  0.00  104.70  10.00  0.00  0.00  1,046.96  1,040,237.91
6048+080.00  0.0000  55.8360  0.00  111.20  10.00  0.00  0.00  1,111.95  1,039,125.96
6048+100.00  0.0000  50.7990  0.00  106.64  10.00  0.00  0.00  1,066.35  1,038,059.61
6048+120.00  0.0000  54.1400  0.00  104.94  10.00  0.00  0.00  1,049.39  1,037,010.22
6048+140.00  0.0000  40.6390  0.00  94.78  10.00  0.00  0.00  947.79  1,036,062.43
6048+160.00  0.0000  38.9090  0.00  79.55  10.00  0.00  0.00  795.48  1,035,266.95
6048+180.00  0.0000  49.6670  0.00  88.58  10.00  0.00  0.00  885.76  1,034,381.19
6048+200.00  0.0000  46.2340  0.00  95.90  10.00  0.00  0.00  959.01  1,033,422.18
6048+220.00  0.0000  50.5610  0.00  96.80  10.00  0.00  0.00  967.95  1,032,454.23
6048+240.00  0.0000  37.2430  0.00  87.80  10.00  0.00  0.00  878.04  1,031,576.19
6048+260.00  0.0000  31.9230  0.00  69.17  10.00  0.00  0.00  691.66  1,030,884.53
6048+280.00  0.0000  38.3870  0.00  70.31  10.00  0.00  0.00  703.10  1,030,181.43
6048+300.00  0.0000  40.4170  0.00  78.80  10.00  0.00  0.00  788.04  1,029,393.39
6048+320.00  0.0000  32.6200  0.00  73.04  10.00  0.00  0.00  730.37  1,028,663.02
6048+340.00  0.0000  37.5840  0.00  70.20  10.00  0.00  0.00  702.04  1,027,960.98
6048+360.00  0.0000  32.7720  0.00  70.36  10.00  0.00  0.00  703.56  1,027,257.42
6048+380.00  0.0000  23.1870  0.00  55.96  10.00  0.00  0.00  559.59  1,026,697.83
6048+400.00  0.0000  36.3250  0.00  59.51  10.00  0.00  0.00  595.12  1,026,102.71
6048+420.00  0.0000  32.0800  0.00  68.41  10.00  0.00  0.00  684.05  1,025,418.66
6048+440.00  0.0000  35.2930  0.00  67.37  10.00  0.00  0.00  673.73  1,024,744.93
6048+460.00  0.0000  35.4660  0.00  70.76  10.00  0.00  0.00  707.59  1,024,037.34
6048+480.00  0.0000  17.2710  0.00  52.74  10.00  0.00  0.00  527.37  1,023,509.97
6048+500.00  0.0000  24.9040  0.00  42.18  10.00  0.00  0.00  421.75  1,023,088.22
6048+520.00  0.0000  18.1060  0.00  43.01  10.00  0.00  0.00  430.10  1,022,658.12
6048+540.00  9.7960  0.1670  9.80  18.27  10.00  97.96  127.35  182.73  1,022,602.74
6048+560.00  4.5330  0.2100  14.33  0.38  10.00  143.29  186.28  3.77  1,022,785.24
6048+580.00  0.0000  13.1440  4.53  13.35  10.00  45.33  58.93  133.54  1,022,710.63
6048+600.00  0.0000  14.9200  0.00  28.06  10.00  0.00  0.00  280.64  1,022,429.99
6048+620.00  0.5840  13.2210  0.58  28.14  10.00  5.84  7.59  281.41  1,022,156.17
6048+640.00  0.0000  16.1040  0.58  29.33  10.00  5.84  7.59  293.25  1,021,870.52
6048+660.00  1.6920  3.6780  1.69  19.78  10.00  16.92  22.00  197.82  1,021,694.69
6048+680.00  1.5090  3.3080  3.20  6.99  10.00  32.01  41.61  69.86  1,021,666.44
6048+700.00  0.0000  13.7320  1.51  17.04  10.00  15.09  19.62  170.40  1,021,515.66
6048+720.00  7.2500  0.1730  7.25  13.91  10.00  72.50  94.25  139.05  1,021,470.86
6048+740.00  9.3690  0.1730  16.62  0.35  10.00  166.19  216.05  3.46  1,021,683.45
6048+760.00  0.0000  14.1060  9.37  14.28  10.00  93.69  121.80  142.79  1,021,662.46
6048+780.00  0.0000  17.1860  0.00  31.29  10.00  0.00  0.00  312.92  1,021,349.54
6048+800.00  0.0000  19.9790  0.00  37.17  10.00  0.00  0.00  371.65  1,020,977.89
6048+820.00  0.0000  13.3320  0.00  33.31  10.00  0.00  0.00  333.11  1,020,644.78
6048+840.00  0.0000  18.0880  0.00  31.42  10.00  0.00  0.00  314.20  1,020,330.58

286 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6048+860.00  0.0000  9.6620  0.00  27.75  10.00  0.00  0.00  277.50  1,020,053.08
6048+880.00  0.0000  13.6040  0.00  23.27  10.00  0.00  0.00  232.66  1,019,820.42
6048+900.00  0.0000  16.3550  0.00  29.96  10.00  0.00  0.00  299.59  1,019,520.83
6048+920.00  0.0000  12.8570  0.00  29.21  10.00  0.00  0.00  292.12  1,019,228.71
6048+940.00  0.8310  10.0430  0.83  22.90  10.00  8.31  10.80  229.00  1,019,010.51
6048+960.00  0.0000  24.6720  0.83  34.72  10.00  8.31  10.80  347.15  1,018,674.16
6048+980.00  0.0000  30.2510  0.00  54.92  10.00  0.00  0.00  549.23  1,018,124.93
6049+000.00  0.0000  23.1660  0.00  53.42  10.00  0.00  0.00  534.17  1,017,590.76
6049+020.00  0.0000  27.3920  0.00  50.56  10.00  0.00  0.00  505.58  1,017,085.18
6049+040.00  0.0000  25.0380  0.00  52.43  10.00  0.00  0.00  524.30  1,016,560.88
6049+060.00  0.0000  27.1880  0.00  52.23  10.00  0.00  0.00  522.26  1,016,038.62
6049+080.00  0.0000  25.7670  0.00  52.96  10.00  0.00  0.00  529.55  1,015,509.07
6049+100.00  2.2420  3.4400  2.24  29.21  10.00  22.42  29.15  292.07  1,015,246.15
6049+120.00  0.0000  21.2240  2.24  24.66  10.00  22.42  29.15  246.64  1,015,028.65
6049+140.00  0.0000  26.5050  0.00  47.73  10.00  0.00  0.00  477.29  1,014,551.36
6049+160.00  0.0000  28.4640  0.00  54.97  10.00  0.00  0.00  549.69  1,014,001.67
6049+180.00  0.0000  25.7080  0.00  54.17  10.00  0.00  0.00  541.72  1,013,459.95
6049+200.00  0.0000  30.9620  0.00  56.67  10.00  0.00  0.00  566.70  1,012,893.25
6049+220.00  1.6180  6.9810  1.62  37.94  10.00  16.18  21.03  379.43  1,012,534.86
6049+240.00  0.0000  25.6800  1.62  32.66  10.00  16.18  21.03  326.61  1,012,229.28
6049+260.00  0.0000  40.1560  0.00  65.84  10.00  0.00  0.00  658.36  1,011,570.92
6049+280.00  0.0000  37.5420  0.00  77.70  10.00  0.00  0.00  776.98  1,010,793.94
6049+300.00  0.0000  35.8150  0.00  73.36  10.00  0.00  0.00  733.57  1,010,060.37
6049+320.00  0.0000  36.8200  0.00  72.64  10.00  0.00  0.00  726.35  1,009,334.02
6049+340.00  0.0000  28.1250  0.00  64.95  10.00  0.00  0.00  649.45  1,008,684.57
6049+360.00  0.0000  45.3150  0.00  73.44  10.00  0.00  0.00  734.40  1,007,950.17
6049+380.00  0.0000  42.1820  0.00  87.50  10.00  0.00  0.00  874.97  1,007,075.20
6049+400.00  0.0000  43.9940  0.00  86.18  10.00  0.00  0.00  861.76  1,006,213.44
6049+420.00  0.0000  50.1440  0.00  94.14  10.00  0.00  0.00  941.38  1,005,272.06
6049+440.00  0.0000  55.0860  0.00  105.23  10.00  0.00  0.00  1,052.30  1,004,219.76
6049+460.00  0.0000  54.6950  0.00  109.78  10.00  0.00  0.00  1,097.81  1,003,121.95
6049+480.00  0.0000  47.7450  0.00  102.44  10.00  0.00  0.00  1,024.40  1,002,097.55
6049+500.00  0.0000  44.8620  0.00  92.61  10.00  0.00  0.00  926.07  1,001,171.48
6049+520.00  0.0000  51.1820  0.00  96.04  10.00  0.00  0.00  960.44  1,000,211.04
6049+540.00  0.0000  49.2290  0.00  100.41  10.00  0.00  0.00  1,004.11  999,206.93 
6049+560.00  0.0000  47.8160  0.00  97.05  10.00  0.00  0.00  970.45  998,236.48 
6049+580.00  0.0000  50.7240  0.00  98.54  10.00  0.00  0.00  985.40  997,251.08 
6049+600.00  0.0000  51.0290  0.00  101.75  10.00  0.00  0.00  1,017.53  996,233.55 
6049+620.00  0.0000  46.6820  0.00  97.71  10.00  0.00  0.00  977.11  995,256.44 
6049+640.00  0.0000  38.7320  0.00  85.41  10.00  0.00  0.00  854.14  994,402.30 
6049+660.00  0.0000  39.9420  0.00  78.67  10.00  0.00  0.00  786.74  993,615.56 
6049+680.00  0.0000  41.6070  0.00  81.55  10.00  0.00  0.00  815.49  992,800.07 
6049+700.00  0.0000  36.3230  0.00  77.93  10.00  0.00  0.00  779.30  992,020.77 
6049+720.00  0.0000  40.3470  0.00  76.67  10.00  0.00  0.00  766.70  991,254.07 
6049+740.00  0.0000  43.9100  0.00  84.26  10.00  0.00  0.00  842.57  990,411.50 

287 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6049+760.00  0.0000  38.6910  0.00  82.60  10.00  0.00  0.00  826.01  989,585.49 
6049+780.00  0.0000  40.8000  0.00  79.49  10.00  0.00  0.00  794.91  988,790.58 
6049+800.00  0.0000  42.3220  0.00  83.12  10.00  0.00  0.00  831.22  987,959.36 
6049+820.00  0.0000  39.9670  0.00  82.29  10.00  0.00  0.00  822.89  987,136.47 
6049+840.00  0.0000  22.8600  0.00  62.83  10.00  0.00  0.00  628.27  986,508.20 
6049+860.00  2.5240  10.2870  2.52  33.15  10.00  25.24  32.81  331.47  986,209.54 
6049+880.00  2.9730  9.0640  5.50  19.35  10.00  54.97  71.46  193.51  986,087.49 
6049+900.00  1.2930  3.4250  4.27  12.49  10.00  42.66  55.46  124.89  986,018.06 
6049+920.00  0.5810  6.4840  1.87  9.91  10.00  18.74  24.36  99.09  985,943.33 
6049+940.00  0.0000  15.5490  0.58  22.03  10.00  5.81  7.55  220.33  985,730.56 
6049+960.00  0.0000  34.6550  0.00  50.20  10.00  0.00  0.00  502.04  985,228.52 
6049+980.00  0.0000  33.8550  0.00  68.51  10.00  0.00  0.00  685.10  984,543.42 
6050+000.00  0.0000  24.1990  0.00  58.05  10.00  0.00  0.00  580.54  983,962.88 
6050+020.00  1.1900  18.4220  1.19  42.62  10.00  11.90  15.47  426.21  983,552.14 
6050+040.00  0.0000  31.2940  1.19  49.72  10.00  11.90  15.47  497.16  983,070.45 
6050+060.00  0.0000  33.4740  0.00  64.77  10.00  0.00  0.00  647.68  982,422.77 
6050+080.00  0.0000  35.0460  0.00  68.52  10.00  0.00  0.00  685.20  981,737.57 
6050+100.00  0.0000  32.7210  0.00  67.77  10.00  0.00  0.00  677.67  981,059.90 
6050+120.00  0.0000  33.9470  0.00  66.67  10.00  0.00  0.00  666.68  980,393.22 
6050+140.00  0.0000  27.4340  0.00  61.38  10.00  0.00  0.00  613.81  979,779.41 
6050+160.00  0.0000  20.7420  0.00  48.18  10.00  0.00  0.00  481.76  979,297.65 
6050+180.00  0.0000  22.3800  0.00  43.12  10.00  0.00  0.00  431.22  978,866.43 
6050+200.00  0.0000  31.7230  0.00  54.10  10.00  0.00  0.00  541.03  978,325.40 
6050+220.00  0.0000  31.2850  0.00  63.01  10.00  0.00  0.00  630.08  977,695.32 
6050+240.00  0.0000  34.8770  0.00  66.16  10.00  0.00  0.00  661.62  977,033.70 
6050+260.00  0.0000  35.9350  0.00  70.81  10.00  0.00  0.00  708.12  976,325.58 
6050+280.00  0.0000  37.8380  0.00  73.77  10.00  0.00  0.00  737.73  975,587.85 
6050+300.00  0.0000  37.9020  0.00  75.74  10.00  0.00  0.00  757.40  974,830.45 
6050+320.00  0.0000  33.2080  0.00  71.11  10.00  0.00  0.00  711.10  974,119.35 
6050+340.00  0.0000  33.2580  0.00  66.47  10.00  0.00  0.00  664.66  973,454.69 
6050+360.00  0.0000  29.2190  0.00  62.48  10.00  0.00  0.00  624.77  972,829.92 
6050+380.00  0.0000  28.2910  0.00  57.51  10.00  0.00  0.00  575.10  972,254.82 
6050+400.00  0.0000  24.4950  0.00  52.79  10.00  0.00  0.00  527.86  971,726.96 
6050+420.00  0.0000  29.0930  0.00  53.59  10.00  0.00  0.00  535.88  971,191.08 
6050+440.00  0.0000  32.1600  0.00  61.25  10.00  0.00  0.00  612.53  970,578.55 
6050+460.00  0.0000  25.2960  0.00  57.46  10.00  0.00  0.00  574.56  970,003.99 
6050+480.00  0.0000  17.0110  0.00  42.31  10.00  0.00  0.00  423.07  969,580.92 
6050+500.00  0.0000  23.3700  0.00  40.38  10.00  0.00  0.00  403.81  969,177.11 
6050+520.00  0.0000  22.6630  0.00  46.03  10.00  0.00  0.00  460.33  968,716.78 
6050+540.00  0.0000  20.8480  0.00  43.51  10.00  0.00  0.00  435.11  968,281.67 
6050+560.00  0.0000  17.0130  0.00  37.86  10.00  0.00  0.00  378.61  967,903.06 
6050+580.00  0.0000  22.5790  0.00  39.59  10.00  0.00  0.00  395.92  967,507.14 
6050+600.00  0.0000  15.3270  0.00  37.91  10.00  0.00  0.00  379.06  967,128.08 
6050+620.00  0.4110  10.7730  0.41  26.10  10.00  4.11  5.34  261.00  966,872.42 
6050+640.00  0.5680  7.3450  0.98  18.12  10.00  9.79  12.73  181.18  966,703.97 

288 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6050+660.00  1.7290  2.9380  2.30  10.28  10.00  22.97  29.86  102.83  966,631.00 
6050+680.00  0.0000  15.6160  1.73  18.55  10.00  17.29  22.48  185.54  966,467.94 
6050+700.00  0.0000  14.6230  0.00  30.24  10.00  0.00  0.00  302.39  966,165.55 
6050+720.00  1.3150  6.3480  1.32  20.97  10.00  13.15  17.10  209.71  965,972.93 
6050+740.00  2.2910  4.2230  3.61  10.57  10.00  36.06  46.88  105.71  965,914.10 
6050+760.00  0.0000  16.4750  2.29  20.70  10.00  22.91  29.78  206.98  965,736.90 
6050+780.00  0.0000  24.2460  0.00  40.72  10.00  0.00  0.00  407.21  965,329.69 
6050+800.00  0.0000  22.2670  0.00  46.51  10.00  0.00  0.00  465.13  964,864.56 
6050+820.00  0.7200  8.1620  0.72  30.43  10.00  7.20  9.36  304.29  964,569.63 
6050+840.00  0.0000  13.7400  0.72  21.90  10.00  7.20  9.36  219.02  964,359.97 
6050+860.00  0.0000  10.9340  0.00  24.67  10.00  0.00  0.00  246.74  964,113.23 
6050+880.00  0.0000  23.5500  0.00  34.48  10.00  0.00  0.00  344.84  963,768.39 
6050+900.00  0.4170  4.6990  0.42  28.25  10.00  4.17  5.42  282.49  963,491.32 
6050+920.00  0.0000  20.4160  0.42  25.12  10.00  4.17  5.42  251.15  963,245.59 
6050+940.00  0.0000  26.8080  0.00  47.22  10.00  0.00  0.00  472.24  962,773.35 
6050+960.00  0.0000  29.9030  0.00  56.71  10.00  0.00  0.00  567.11  962,206.24 
6050+980.00  0.0000  36.1360  0.00  66.04  10.00  0.00  0.00  660.39  961,545.85 
6051+000.00  0.0000  36.9170  0.00  73.05  10.00  0.00  0.00  730.53  960,815.32 
6051+020.00  0.0000  34.3310  0.00  71.25  10.00  0.00  0.00  712.48  960,102.84 
6051+040.00  0.0000  29.8570  0.00  64.19  10.00  0.00  0.00  641.88  959,460.96 
6051+060.00  0.0000  9.7340  0.00  39.59  10.00  0.00  0.00  395.91  959,065.05 
6051+080.00  0.0000  28.7250  0.00  38.46  10.00  0.00  0.00  384.59  958,680.46 
6051+100.00  0.0000  34.2400  0.00  62.97  10.00  0.00  0.00  629.65  958,050.81 
6051+120.00  0.0000  38.4330  0.00  72.67  10.00  0.00  0.00  726.73  957,324.08 
6051+140.00  0.0000  39.8740  0.00  78.31  10.00  0.00  0.00  783.07  956,541.01 
6051+160.00  0.0000  37.7140  0.00  77.59  10.00  0.00  0.00  775.88  955,765.13 
6051+180.00  0.0000  35.3880  0.00  73.10  10.00  0.00  0.00  731.02  955,034.11 
6051+200.00  0.0000  36.4060  0.00  71.79  10.00  0.00  0.00  717.94  954,316.17 
6051+220.00  0.0000  38.0240  0.00  74.43  10.00  0.00  0.00  744.30  953,571.87 
6051+240.00  0.0000  38.0970  0.00  76.12  10.00  0.00  0.00  761.21  952,810.66 
6051+260.00  0.0000  39.5980  0.00  77.70  10.00  0.00  0.00  776.95  952,033.71 
6051+280.00  0.0000  32.1790  0.00  71.78  10.00  0.00  0.00  717.77  951,315.94 
6051+300.00  0.0000  19.6840  0.00  51.86  10.00  0.00  0.00  518.63  950,797.31 
6051+320.00  6.8510  0.2810  6.85  19.97  10.00  68.51  89.06  199.65  950,686.73 
6051+340.00  15.4340  0.1520  22.29  0.43  10.00  222.85  289.71  4.33  950,972.10 
6051+360.00  4.5120  2.1160  19.95  2.27  10.00  199.46  259.30  22.68  951,208.72 
6051+380.00  0.7650  4.8510  5.28  6.97  10.00  52.77  68.60  69.67  951,207.65 
6051+400.00  0.0000  10.0340  0.77  14.89  10.00  7.65  9.95  148.85  951,068.75 
6051+420.00  0.0000  9.9220  0.00  19.96  10.00  0.00  0.00  199.56  950,869.19 
6051+440.00  0.0000  25.7700  0.00  35.69  10.00  0.00  0.00  356.92  950,512.27 
6051+460.00  0.0000  14.0990  0.00  39.87  10.00  0.00  0.00  398.69  950,113.58 
6051+480.00  1.3310  6.5150  1.33  20.61  10.00  13.31  17.30  206.14  949,924.74 
6051+500.00  0.3740  9.1990  1.71  15.71  10.00  17.05  22.17  157.14  949,789.76 
6051+520.00  0.0000  18.4270  0.37  27.63  10.00  3.74  4.86  276.26  949,518.37 
6051+540.00  0.0000  16.3470  0.00  34.77  10.00  0.00  0.00  347.74  949,170.63 

289 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6051+560.00  0.5750  13.6190  0.58  29.97  10.00  5.75  7.48  299.66  948,878.44 
6051+580.00  0.0000  24.7930  0.58  38.41  10.00  5.75  7.48  384.12  948,501.80 
6051+600.00  0.0000  27.4490  0.00  52.24  10.00  0.00  0.00  522.42  947,979.38 
6051+620.00  0.0000  25.5520  0.00  53.00  10.00  0.00  0.00  530.01  947,449.37 
6051+640.00  0.5610  4.9650  0.56  30.52  10.00  5.61  7.29  305.17  947,151.49 
6051+660.00  0.4800  15.0610  1.04  20.03  10.00  10.41  13.53  200.26  946,964.76 
6051+680.00  0.0000  29.6050  0.48  44.67  10.00  4.80  6.24  446.66  946,524.34 
6051+700.00  0.0000  26.8070  0.00  56.41  10.00  0.00  0.00  564.12  945,960.22 
6051+720.00  0.0000  24.7390  0.00  51.55  10.00  0.00  0.00  515.46  945,444.76 
6051+740.00  0.0000  34.8950  0.00  59.63  10.00  0.00  0.00  596.34  944,848.42 
6051+760.00  0.0000  29.1720  0.00  64.07  10.00  0.00  0.00  640.67  944,207.75 
6051+780.00  0.0000  38.8430  0.00  68.02  10.00  0.00  0.00  680.15  943,527.60 
6051+800.00  0.0000  28.5320  0.00  67.38  10.00  0.00  0.00  673.75  942,853.85 
6051+820.00  0.0000  27.2610  0.00  55.79  10.00  0.00  0.00  557.93  942,295.92 
6051+840.00  0.0000  27.2550  0.00  54.52  10.00  0.00  0.00  545.16  941,750.76 
6051+860.00  0.0000  33.4010  0.00  60.66  10.00  0.00  0.00  606.56  941,144.20 
6051+880.00  0.0000  28.1060  0.00  61.51  10.00  0.00  0.00  615.07  940,529.13 
6051+900.00  0.0000  22.9860  0.00  51.09  10.00  0.00  0.00  510.92  940,018.21 
6051+920.00  0.0000  34.7420  0.00  57.73  10.00  0.00  0.00  577.28  939,440.93 
6051+940.00  0.0000  33.7870  0.00  68.53  10.00  0.00  0.00  685.29  938,755.64 
6051+960.00  0.0000  40.9460  0.00  74.73  10.00  0.00  0.00  747.33  938,008.31 
6051+980.00  0.0000  41.8860  0.00  82.83  10.00  0.00  0.00  828.32  937,179.99 
6052+000.00  0.0000  36.0140  0.00  77.90  10.00  0.00  0.00  779.00  936,400.99 
6052+020.00  0.0000  34.6890  0.00  70.70  10.00  0.00  0.00  707.03  935,693.96 
6052+040.00  0.0000  28.9140  0.00  63.60  10.00  0.00  0.00  636.03  935,057.93 
6052+060.00  0.0000  45.5660  0.00  74.48  10.00  0.00  0.00  744.80  934,313.13 
6052+080.00  0.0000  39.2210  0.00  84.79  10.00  0.00  0.00  847.87  933,465.26 
6052+100.00  0.0000  13.0760  0.00  52.30  10.00  0.00  0.00  522.97  932,942.29 
6052+120.00  0.0000  32.3500  0.00  45.43  10.00  0.00  0.00  454.26  932,488.03 
6052+140.00  0.0000  40.2110  0.00  72.56  10.00  0.00  0.00  725.61  931,762.42 
6052+160.00  0.0000  47.7820  0.00  87.99  10.00  0.00  0.00  879.93  930,882.49 
6052+180.00  0.0000  50.0670  0.00  97.85  10.00  0.00  0.00  978.49  929,904.00 
6052+200.00  0.0000  50.1450  0.00  100.21  10.00  0.00  0.00  1,002.12  928,901.88 
6052+220.00  0.0000  49.7850  0.00  99.93  10.00  0.00  0.00  999.30  927,902.58 
6052+240.00  0.0000  39.7880  0.00  89.57  10.00  0.00  0.00  895.73  927,006.85 
6052+260.00  0.0000  35.9200  0.00  75.71  10.00  0.00  0.00  757.08  926,249.77 
6052+280.00  0.0000  43.6720  0.00  79.59  10.00  0.00  0.00  795.92  925,453.85 
6052+300.00  0.0000  41.6180  0.00  85.29  10.00  0.00  0.00  852.90  924,600.95 
6052+320.00  0.0000  37.6700  0.00  79.29  10.00  0.00  0.00  792.88  923,808.07 
6052+340.00  0.0000  39.9610  0.00  77.63  10.00  0.00  0.00  776.31  923,031.76 
6052+360.00  0.0000  48.0230  0.00  87.98  10.00  0.00  0.00  879.84  922,151.92 
6052+380.00  0.0000  45.3420  0.00  93.37  10.00  0.00  0.00  933.65  921,218.27 
6052+400.00  0.0000  19.6040  0.00  64.95  10.00  0.00  0.00  649.46  920,568.81 
6052+420.00  0.0000  31.6700  0.00  51.27  10.00  0.00  0.00  512.74  920,056.07 
6052+420.00  0.0000  39.4620  0.00  71.13  0.00  0.00  0.00  0.00  920,056.07 

290 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6052+440.00  0.0000  35.5970  0.00  75.06  10.00  0.00  0.00  750.59  919,305.48 
6052+460.00  0.0000  34.3200  0.00  69.92  10.00  0.00  0.00  699.17  918,606.31 
6052+480.00  0.0000  45.4020  0.00  79.72  10.00  0.00  0.00  797.22  917,809.09 
6052+490.00  0.0000  44.2000  0.00  89.60  5.00  0.00  0.00  448.01  917,361.08 
6052+490.00  0.0000  36.8680  0.00  81.07  0.00  0.00  0.00  0.00  917,361.08 
6052+500.00  0.0000  36.3580  0.00  73.23  5.00  0.00  0.00  366.13  916,994.95 
6052+520.00  0.0000  43.8920  0.00  80.25  10.00  0.00  0.00  802.50  916,192.45 
6052+540.00  0.0000  35.1850  0.00  79.08  10.00  0.00  0.00  790.77  915,401.68 
6052+560.00  0.0000  33.5420  0.00  68.73  10.00  0.00  0.00  687.27  914,714.41 
6052+580.00  0.0000  25.0910  0.00  58.63  10.00  0.00  0.00  586.33  914,128.08 
6052+600.00  0.0000  29.7800  0.00  54.87  10.00  0.00  0.00  548.71  913,579.37 
6052+620.00  0.0000  40.3130  0.00  70.09  10.00  0.00  0.00  700.93  912,878.44 
6052+640.00  0.0000  37.7070  0.00  78.02  10.00  0.00  0.00  780.20  912,098.24 
6052+660.00  0.0000  53.8810  0.00  91.59  10.00  0.00  0.00  915.88  911,182.36 
6052+680.00  0.0000  53.0250  0.00  106.91  10.00  0.00  0.00  1,069.06  910,113.30 
6052+700.00  0.0000  44.2110  0.00  97.24  10.00  0.00  0.00  972.36  909,140.94 
6052+720.00  0.0000  44.3810  0.00  88.59  10.00  0.00  0.00  885.92  908,255.02 
6052+740.00  0.0000  37.6730  0.00  82.05  10.00  0.00  0.00  820.54  907,434.48 
6052+760.00  0.0000  34.7150  0.00  72.39  10.00  0.00  0.00  723.88  906,710.60 
6052+780.00  0.0000  12.5660  0.00  47.28  10.00  0.00  0.00  472.81  906,237.79 
6052+800.00  0.0000  16.2320  0.00  28.80  10.00  0.00  0.00  287.98  905,949.81 
6052+820.00  0.0000  25.9910  0.00  42.22  10.00  0.00  0.00  422.23  905,527.58 
6052+840.00  0.0000  17.1860  0.00  43.18  10.00  0.00  0.00  431.77  905,095.81 
6052+860.00  0.0000  33.1540  0.00  50.34  10.00  0.00  0.00  503.40  904,592.41 
6052+880.00  0.0000  28.6770  0.00  61.83  10.00  0.00  0.00  618.31  903,974.10 
6052+900.00  0.0000  38.7820  0.00  67.46  10.00  0.00  0.00  674.59  903,299.51 
6052+920.00  0.0000  21.7490  0.00  60.53  10.00  0.00  0.00  605.31  902,694.20 
6052+940.00  0.0000  46.2050  0.00  67.95  10.00  0.00  0.00  679.54  902,014.66 
6052+960.00  0.0000  44.4020  0.00  90.61  10.00  0.00  0.00  906.07  901,108.59 
6052+980.00  0.0000  38.4410  0.00  82.84  10.00  0.00  0.00  828.43  900,280.16 
6053+000.00  0.0000  40.9710  0.00  79.41  10.00  0.00  0.00  794.12  899,486.04 
6053+020.00  0.0000  28.9730  0.00  69.94  10.00  0.00  0.00  699.44  898,786.60 
6053+040.00  0.0000  30.3190  0.00  59.29  10.00  0.00  0.00  592.92  898,193.68 
6053+060.00  0.0000  22.1860  0.00  52.51  10.00  0.00  0.00  525.05  897,668.63 
6053+080.00  0.9170  10.8790  0.92  33.07  10.00  9.17  11.92  330.65  897,349.90 
6053+100.00  0.0000  26.0190  0.92  36.90  10.00  9.17  11.92  368.98  896,992.84 
6053+120.00  0.0000  25.0050  0.00  51.02  10.00  0.00  0.00  510.24  896,482.60 
6053+140.00  0.0000  23.7210  0.00  48.73  10.00  0.00  0.00  487.26  895,995.34 
6053+160.00  0.0000  31.0890  0.00  54.81  10.00  0.00  0.00  548.10  895,447.24 
6053+180.00  0.0000  14.1680  0.00  45.26  10.00  0.00  0.00  452.57  894,994.67 
6053+200.00  0.0000  12.3910  0.00  26.56  10.00  0.00  0.00  265.59  894,729.08 
6053+220.00  0.0000  24.1100  0.00  36.50  10.00  0.00  0.00  365.01  894,364.07 
6053+240.00  0.0000  36.7440  0.00  60.85  10.00  0.00  0.00  608.54  893,755.53 
6053+260.00  0.0000  37.0740  0.00  73.82  10.00  0.00  0.00  738.18  893,017.35 
6053+280.00  0.0000  31.6800  0.00  68.75  10.00  0.00  0.00  687.54  892,329.81 

291 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6053+300.00  0.0000  33.2920  0.00  64.97  10.00  0.00  0.00  649.72  891,680.09 
6053+320.00  0.0000  23.6030  0.00  56.90  10.00  0.00  0.00  568.95  891,111.14 
6053+340.00  8.7520  0.1690  8.75  23.77  10.00  87.52  113.78  237.72  890,987.20 
6053+360.00  0.0000  23.2210  8.75  23.39  10.00  87.52  113.78  233.90  890,867.08 
6053+380.00  0.0000  34.0740  0.00  57.30  10.00  0.00  0.00  572.95  890,294.13 
6053+400.00  0.0000  23.8800  0.00  57.95  10.00  0.00  0.00  579.54  889,714.59 
6053+420.00  0.0000  22.1160  0.00  46.00  10.00  0.00  0.00  459.96  889,254.63 
6053+440.00  0.0000  39.8910  0.00  62.01  10.00  0.00  0.00  620.07  888,634.56 
6053+460.00  0.0000  29.5030  0.00  69.39  10.00  0.00  0.00  693.94  887,940.62 
6053+480.00  0.0000  38.6760  0.00  68.18  10.00  0.00  0.00  681.79  887,258.83 
6053+500.00  0.0000  36.4780  0.00  75.15  10.00  0.00  0.00  751.54  886,507.29 
6053+520.00  0.0000  24.4630  0.00  60.94  10.00  0.00  0.00  609.41  885,897.88 
6053+540.00  0.0000  44.1240  0.00  68.59  10.00  0.00  0.00  685.87  885,212.01 
6053+560.00  0.0000  42.7980  0.00  86.92  10.00  0.00  0.00  869.22  884,342.79 
6053+580.00  0.0000  51.6540  0.00  94.45  10.00  0.00  0.00  944.52  883,398.27 
6053+600.00  0.0000  48.3730  0.00  100.03  10.00  0.00  0.00  1,000.27  882,398.00 
6053+620.00  0.0000  43.0470  0.00  91.42  10.00  0.00  0.00  914.20  881,483.80 
6053+640.00  0.0000  17.4280  0.00  60.48  10.00  0.00  0.00  604.75  880,879.05 
6053+660.00  0.0000  15.8380  0.00  33.27  10.00  0.00  0.00  332.66  880,546.39 
6053+680.00  0.0000  46.0490  0.00  61.89  10.00  0.00  0.00  618.87  879,927.52 
6053+700.00  0.0000  42.8620  0.00  88.91  10.00  0.00  0.00  889.11  879,038.41 
6053+720.00  0.0000  39.9190  0.00  82.78  10.00  0.00  0.00  827.81  878,210.60 
6053+740.00  0.0000  47.2160  0.00  87.14  10.00  0.00  0.00  871.35  877,339.25 
6053+760.00  0.0000  38.8010  0.00  86.02  10.00  0.00  0.00  860.17  876,479.08 
6053+780.00  0.0000  35.5070  0.00  74.31  10.00  0.00  0.00  743.08  875,736.00 
6053+800.00  0.0000  34.2520  0.00  69.76  10.00  0.00  0.00  697.59  875,038.41 
6053+820.00  0.0000  39.0380  0.00  73.29  10.00  0.00  0.00  732.90  874,305.51 
6053+840.00  0.0000  48.2310  0.00  87.27  10.00  0.00  0.00  872.69  873,432.82 
6053+860.00  0.0000  56.7460  0.00  104.98  10.00  0.00  0.00  1,049.77  872,383.05 
6053+880.00  0.0000  56.9990  0.00  113.75  10.00  0.00  0.00  1,137.45  871,245.60 
6053+900.00  0.0000  55.7500  0.00  112.75  10.00  0.00  0.00  1,127.49  870,118.11 
6053+920.00  0.0000  50.6930  0.00  106.44  10.00  0.00  0.00  1,064.43  869,053.68 
6053+940.00  0.0000  33.8310  0.00  84.52  10.00  0.00  0.00  845.24  868,208.44 
6053+960.00  0.0000  38.8880  0.00  72.72  10.00  0.00  0.00  727.19  867,481.25 
6053+980.00  0.0000  39.9770  0.00  78.87  10.00  0.00  0.00  788.65  866,692.60 
6054+000.00  0.0000  43.7480  0.00  83.73  10.00  0.00  0.00  837.25  865,855.35 
6054+020.00  0.0000  42.1780  0.00  85.93  10.00  0.00  0.00  859.26  864,996.09 
6054+040.00  0.0000  40.8570  0.00  83.04  10.00  0.00  0.00  830.35  864,165.74 
6054+060.00  0.0000  21.7930  0.00  62.65  10.00  0.00  0.00  626.50  863,539.24 
6054+080.00  0.0000  28.5040  0.00  50.30  10.00  0.00  0.00  502.97  863,036.27 
6054+100.00  0.0000  28.6710  0.00  57.18  10.00  0.00  0.00  571.75  862,464.52 
6054+120.00  0.0000  25.8560  0.00  54.53  10.00  0.00  0.00  545.27  861,919.25 
6054+140.00  0.0000  19.5110  0.00  45.37  10.00  0.00  0.00  453.67  861,465.58 
6054+160.00  0.0000  27.7400  0.00  47.25  10.00  0.00  0.00  472.51  860,993.07 
6054+180.00  0.0000  17.2770  0.00  45.02  10.00  0.00  0.00  450.17  860,542.90 

292 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6054+200.00  0.0000  13.6110  0.00  30.89  10.00  0.00  0.00  308.88  860,234.02 
6054+220.00  0.0000  26.2700  0.00  39.88  10.00  0.00  0.00  398.81  859,835.21 
6054+240.00  0.0000  18.7420  0.00  45.01  10.00  0.00  0.00  450.12  859,385.09 
6054+260.00  0.0000  24.8340  0.00  43.58  10.00  0.00  0.00  435.76  858,949.33 
6054+280.00  0.0000  24.9660  0.00  49.80  10.00  0.00  0.00  498.00  858,451.33 
6054+300.00  0.0000  29.7870  0.00  54.75  10.00  0.00  0.00  547.53  857,903.80 
6054+320.00  0.0000  29.7960  0.00  59.58  10.00  0.00  0.00  595.83  857,307.97 
6054+340.00  0.5840  19.2290  0.58  49.03  10.00  5.84  7.59  490.25  856,825.31 
6054+360.00  0.0000  23.8270  0.58  43.06  10.00  5.84  7.59  430.56  856,402.34 
6054+380.00  0.0000  21.3830  0.00  45.21  10.00  0.00  0.00  452.10  855,950.24 
6054+400.00  0.0000  18.3640  0.00  39.75  10.00  0.00  0.00  397.47  855,552.77 
6054+420.00  0.0000  17.5960  0.00  35.96  10.00  0.00  0.00  359.60  855,193.17 
6054+440.00  0.7880  7.5590  0.79  25.16  10.00  7.88  10.24  251.55  854,951.86 
6054+460.00  1.4340  6.7370  2.22  14.30  10.00  22.22  28.89  142.96  854,837.79 
6054+480.00  5.7780  0.2400  7.21  6.98  10.00  72.12  93.76  69.77  854,861.78 
6054+500.00  3.4670  1.4810  9.25  1.72  10.00  92.45  120.19  17.21  854,964.75 
6054+520.00  0.0000  16.7030  3.47  18.18  10.00  34.67  45.07  181.84  854,827.98 
6054+540.00  0.7710  9.5710  0.77  26.27  10.00  7.71  10.02  262.74  854,575.26 
6054+560.00  0.0000  20.3910  0.77  29.96  10.00  7.71  10.02  299.62  854,285.67 
6054+580.00  0.0000  22.3090  0.00  42.70  10.00  0.00  0.00  427.00  853,858.67 
6054+600.00  0.0000  21.4800  0.00  43.79  10.00  0.00  0.00  437.89  853,420.78 
6054+620.00  0.0000  9.7800  0.00  31.26  10.00  0.00  0.00  312.60  853,108.18 
6054+640.00  0.0000  15.9160  0.00  25.70  10.00  0.00  0.00  256.96  852,851.22 
6054+660.00  0.7820  5.8930  0.78  21.81  10.00  7.82  10.17  218.09  852,643.29 
6054+680.00  0.0000  10.3970  0.78  16.29  10.00  7.82  10.17  162.90  852,490.56 
6054+700.00  0.0000  13.0450  0.00  23.44  10.00  0.00  0.00  234.42  852,256.14 
6054+720.00  0.0000  11.2890  0.00  24.33  10.00  0.00  0.00  243.34  852,012.80 
6054+740.00  0.0000  19.6740  0.00  30.96  10.00  0.00  0.00  309.63  851,703.17 
6054+760.00  0.3820  13.6480  0.38  33.32  10.00  3.82  4.97  333.22  851,374.92 
6054+780.00  0.0000  18.6470  0.38  32.30  10.00  3.82  4.97  322.95  851,056.93 
6054+800.00  0.0000  30.4930  0.00  49.14  10.00  0.00  0.00  491.40  850,565.53 
6054+820.00  0.0000  33.2170  0.00  63.71  10.00  0.00  0.00  637.10  849,928.43 
6054+840.00  0.0000  31.2350  0.00  64.45  10.00  0.00  0.00  644.52  849,283.91 
6054+860.00  0.0000  14.0710  0.00  45.31  10.00  0.00  0.00  453.06  848,830.85 
6054+880.00  0.0000  42.3040  0.00  56.38  10.00  0.00  0.00  563.75  848,267.10 
6054+900.00  0.0000  46.8180  0.00  89.12  10.00  0.00  0.00  891.22  847,375.88 
6054+920.00  0.0000  29.0810  0.00  75.90  10.00  0.00  0.00  758.99  846,616.89 
6054+940.00  0.0000  31.5580  0.00  60.64  10.00  0.00  0.00  606.39  846,010.50 
6054+960.00  0.0000  38.9520  0.00  70.51  10.00  0.00  0.00  705.10  845,305.40 
6054+980.00  0.0000  37.6530  0.00  76.61  10.00  0.00  0.00  766.05  844,539.35 
6055+000.00  0.0000  46.2460  0.00  83.90  10.00  0.00  0.00  838.99  843,700.36 
6055+020.00  0.0000  19.5590  0.00  65.81  10.00  0.00  0.00  658.05  843,042.31 
6055+040.00  0.0000  6.7980  0.00  26.36  10.00  0.00  0.00  263.57  842,778.74 
6055+060.00  0.0000  41.4120  0.00  48.21  10.00  0.00  0.00  482.10  842,296.64 
6055+080.00  0.0000  53.8200  0.00  95.23  10.00  0.00  0.00  952.32  841,344.32 

293 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6055+100.00  0.0000  55.0790  0.00  108.90  10.00  0.00  0.00  1,088.99  840,255.33 
6055+120.00  0.0000  50.0290  0.00  105.11  10.00  0.00  0.00  1,051.08  839,204.25 
6055+140.00  0.0000  28.3070  0.00  78.34  10.00  0.00  0.00  783.36  838,420.89 
6055+160.00  0.0000  9.8500  0.00  38.16  10.00  0.00  0.00  381.57  838,039.32 
6055+180.00  0.0000  37.3510  0.00  47.20  10.00  0.00  0.00  472.01  837,567.31 
6055+200.00  0.0000  14.7770  0.00  52.13  10.00  0.00  0.00  521.28  837,046.03 
6055+220.00  0.0000  20.1750  0.00  34.95  10.00  0.00  0.00  349.52  836,696.51 
6055+240.00  0.0000  34.4440  0.00  54.62  10.00  0.00  0.00  546.19  836,150.32 
6055+260.00  0.0000  16.7860  0.00  51.23  10.00  0.00  0.00  512.30  835,638.02 
6055+280.00  0.0000  24.2560  0.00  41.04  10.00  0.00  0.00  410.42  835,227.60 
6055+300.00  1.0540  14.5570  1.05  38.81  10.00  10.54  13.70  388.13  834,853.17 
6055+320.00  0.0000  36.0550  1.05  50.61  10.00  10.54  13.70  506.12  834,360.76 
6055+340.00  0.0000  32.3580  0.00  68.41  10.00  0.00  0.00  684.13  833,676.63 
6055+360.00  0.0000  31.2380  0.00  63.60  10.00  0.00  0.00  635.96  833,040.67 
6055+380.00  0.0000  18.2510  0.00  49.49  10.00  0.00  0.00  494.89  832,545.78 
6055+400.00  0.0000  47.2250  0.00  65.48  10.00  0.00  0.00  654.76  831,891.02 
6055+420.00  0.0000  45.3410  0.00  92.57  10.00  0.00  0.00  925.66  830,965.36 
6055+440.00  0.0000  37.0670  0.00  82.41  10.00  0.00  0.00  824.08  830,141.28 
6055+460.00  0.0000  46.5840  0.00  83.65  10.00  0.00  0.00  836.51  829,304.77 
6055+480.00  0.0000  32.2710  0.00  78.86  10.00  0.00  0.00  788.55  828,516.22 
6055+500.00  0.0000  34.6190  0.00  66.89  10.00  0.00  0.00  668.90  827,847.32 
6055+520.00  0.0000  46.9470  0.00  81.57  10.00  0.00  0.00  815.66  827,031.66 
6055+540.00  0.0000  33.6970  0.00  80.64  10.00  0.00  0.00  806.44  826,225.22 
6055+560.00  0.0000  46.4180  0.00  80.12  10.00  0.00  0.00  801.15  825,424.07 
6055+580.00  0.0000  49.8830  0.00  96.30  10.00  0.00  0.00  963.01  824,461.06 
6055+600.00  0.0000  32.3210  0.00  82.20  10.00  0.00  0.00  822.04  823,639.02 
6055+620.00  0.0000  11.5610  0.00  43.88  10.00  0.00  0.00  438.82  823,200.20 
6055+640.00  0.0000  40.0730  0.00  51.63  10.00  0.00  0.00  516.34  822,683.86 
6055+660.00  0.0000  44.7720  0.00  84.85  10.00  0.00  0.00  848.45  821,835.41 
6055+680.00  0.0000  46.9030  0.00  91.68  10.00  0.00  0.00  916.75  820,918.66 
6055+700.00  0.0000  50.7030  0.00  97.61  10.00  0.00  0.00  976.06  819,942.60 
6055+720.00  0.0000  25.0790  0.00  75.78  10.00  0.00  0.00  757.82  819,184.78 
6055+740.00  0.0000  5.8560  0.00  30.94  10.00  0.00  0.00  309.35  818,875.43 
6055+760.00  0.0000  28.9480  0.00  34.80  10.00  0.00  0.00  348.04  818,527.39 
6055+780.00  0.0000  35.9540  0.00  64.90  10.00  0.00  0.00  649.02  817,878.37 
6055+800.00  0.0000  22.5950  0.00  58.55  10.00  0.00  0.00  585.49  817,292.88 
6055+820.00  0.8600  15.6890  0.86  38.28  10.00  8.60  11.18  382.84  816,921.22 
6055+840.00  0.0000  27.8040  0.86  43.49  10.00  8.60  11.18  434.93  816,497.47 
6055+860.00  0.0000  37.4140  0.00  65.22  10.00  0.00  0.00  652.18  815,845.29 
6055+880.00  0.0000  46.0040  0.00  83.42  10.00  0.00  0.00  834.18  815,011.11 
6055+900.00  0.0000  53.0100  0.00  99.01  10.00  0.00  0.00  990.14  814,020.97 
6055+920.00  0.0000  57.2980  0.00  110.31  10.00  0.00  0.00  1,103.08  812,917.89 
6055+940.00  0.0000  31.3950  0.00  88.69  10.00  0.00  0.00  886.93  812,030.96 
6055+960.00  0.0000  26.1070  0.00  57.50  10.00  0.00  0.00  575.02  811,455.94 
6055+980.00  0.0000  29.9020  0.00  56.01  10.00  0.00  0.00  560.09  810,895.85 

294 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6056+000.00  0.0000  36.2520  0.00  66.15  10.00  0.00  0.00  661.54  810,234.31 
6056+020.00  0.0000  35.9950  0.00  72.25  10.00  0.00  0.00  722.47  809,511.84 
6056+040.00  0.0000  24.2250  0.00  60.22  10.00  0.00  0.00  602.20  808,909.64 
6056+060.00  0.0000  22.2010  0.00  46.43  10.00  0.00  0.00  464.26  808,445.38 
6056+080.00  2.6120  12.2800  2.61  34.48  10.00  26.12  33.96  344.81  808,134.52 
6056+100.00  0.0000  19.1500  2.61  31.43  10.00  26.12  33.96  314.30  807,854.18 
6056+120.00  0.0000  30.6690  0.00  49.82  10.00  0.00  0.00  498.19  807,355.99 
6056+140.00  0.0000  42.5600  0.00  73.23  10.00  0.00  0.00  732.29  806,623.70 
6056+160.00  0.0000  50.9750  0.00  93.54  10.00  0.00  0.00  935.35  805,688.35 
6056+170.00  0.0000  50.5730  0.00  101.55  5.00  0.00  0.00  507.74  805,180.61 
6056+170.00  0.0000  47.1560  0.00  97.73  0.00  0.00  0.00  0.00  805,180.61 
6056+180.00  0.0000  44.7130  0.00  91.87  5.00  0.00  0.00  459.35  804,721.26 
6056+200.00  0.0000  46.6510  0.00  91.36  10.00  0.00  0.00  913.64  803,807.62 
6056+220.00  0.0000  30.3240  0.00  76.98  10.00  0.00  0.00  769.75  803,037.87 
6056+240.00  0.0000  18.4060  0.00  48.73  10.00  0.00  0.00  487.30  802,550.57 
6056+260.00  0.0000  33.3560  0.00  51.76  10.00  0.00  0.00  517.62  802,032.95 
6056+280.00  0.0000  27.0730  0.00  60.43  10.00  0.00  0.00  604.29  801,428.66 
6056+300.00  0.0000  29.4210  0.00  56.49  10.00  0.00  0.00  564.94  800,863.72 
6056+300.00  0.0000  27.4160  0.00  56.84  0.00  0.00  0.00  0.00  800,863.72 
6056+320.00  0.0000  31.9730  0.00  59.39  10.00  0.00  0.00  593.89  800,269.83 
6056+340.00  0.0000  28.0370  0.00  60.01  10.00  0.00  0.00  600.10  799,669.73 
6056+360.00  0.0000  14.7440  0.00  42.78  10.00  0.00  0.00  427.81  799,241.92 
6056+380.00  0.0000  23.8740  0.00  38.62  10.00  0.00  0.00  386.18  798,855.74 
6056+400.00  0.0000  18.4080  0.00  42.28  10.00  0.00  0.00  422.82  798,432.92 
6056+420.00  0.0000  25.8670  0.00  44.28  10.00  0.00  0.00  442.75  797,990.17 
6056+440.00  0.0000  27.3210  0.00  53.19  10.00  0.00  0.00  531.88  797,458.29 
6056+460.00  0.0000  27.2080  0.00  54.53  10.00  0.00  0.00  545.29  796,913.00 
6056+480.00  0.0000  13.6700  0.00  40.88  10.00  0.00  0.00  408.78  796,504.22 
6056+500.00  0.0000  19.0840  0.00  32.75  10.00  0.00  0.00  327.54  796,176.68 
6056+520.00  0.0000  20.7120  0.00  39.80  10.00  0.00  0.00  397.96  795,778.72 
6056+540.00  0.0000  15.4700  0.00  36.18  10.00  0.00  0.00  361.82  795,416.90 
6056+560.00  0.0000  13.9900  0.00  29.46  10.00  0.00  0.00  294.60  795,122.30 
6056+580.00  0.0000  23.4840  0.00  37.47  10.00  0.00  0.00  374.74  794,747.56 
6056+600.00  0.0000  29.5000  0.00  52.98  10.00  0.00  0.00  529.84  794,217.72 
6056+614.06  0.9210  18.7300  0.92  48.23  7.03  6.48  8.42  339.15  793,886.99 
6056+620.00  1.0910  14.9080  2.01  33.64  2.97  5.97  7.76  99.84  793,794.91 
6056+640.00  0.0000  32.9320  1.09  47.84  10.00  10.91  14.18  478.40  793,330.70 
6056+644.06  0.0000  33.1660  0.00  66.10  2.03  0.00  0.00  134.31  793,196.39 
6056+660.00  0.0000  24.3370  0.00  57.50  7.97  0.00  0.00  458.18  792,738.20 
6056+680.00  0.0000  43.7080  0.00  68.05  10.00  0.00  0.00  680.45  792,057.75 
6056+700.00  0.0000  46.4260  0.00  90.13  10.00  0.00  0.00  901.34  791,156.41 
6056+720.00  0.0000  34.2990  0.00  80.73  10.00  0.00  0.00  807.25  790,349.16 
6056+734.82  0.0000  29.2840  0.00  63.58  7.41  0.00  0.00  471.05  789,878.11 
6056+740.00  0.0000  27.3080  0.00  56.59  2.59  0.00  0.00  146.66  789,731.45 
6056+760.00  0.8840  4.2920  0.88  31.60  10.00  8.84  11.49  316.00  789,426.94 

295 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6056+764.82  0.0000  6.0700  0.88  10.36  2.41  2.13  2.77  24.96  789,404.75 
6056+770.00  0.0000  8.9470  0.00  15.02  2.59  0.00  0.00  38.92  789,365.84 
6056+770.00  0.0000  7.1270  0.00  16.07  0.00  0.00  0.00  0.00  789,365.84 
6056+780.00  0.0000  13.0870  0.00  20.21  5.00  0.00  0.00  101.07  789,264.77 
6056+800.00  1.7590  8.5580  1.76  21.65  10.00  17.59  22.87  216.45  789,071.18 
6056+820.00  4.2030  4.7780  5.96  13.34  10.00  59.62  77.51  133.36  789,015.33 
6056+840.00  0.0000  28.9510  4.20  33.73  10.00  42.03  54.64  337.29  788,732.68 
6056+860.00  0.0000  32.0800  0.00  61.03  10.00  0.00  0.00  610.31  788,122.37 
6056+860.00  0.0000  36.3230  0.00  68.40  0.00  0.00  0.00  0.00  788,122.37 
6056+880.00  0.0000  42.3030  0.00  78.63  10.00  0.00  0.00  786.26  787,336.11 
6056+900.00  0.0000  39.4270  0.00  81.73  10.00  0.00  0.00  817.30  786,518.81 
6056+920.00  0.0000  31.7830  0.00  71.21  10.00  0.00  0.00  712.10  785,806.71 
6056+940.00  0.8460  10.6500  0.85  42.43  10.00  8.46  11.00  424.33  785,393.38 
6056+960.00  1.2990  14.0270  2.15  24.68  10.00  21.45  27.89  246.77  785,174.49 
6056+980.00  0.0000  31.4540  1.30  45.48  10.00  12.99  16.89  454.81  784,736.57 
6057+000.00  0.0000  35.3910  0.00  66.85  10.00  0.00  0.00  668.45  784,068.12 
6057+020.00  0.0000  35.7710  0.00  71.16  10.00  0.00  0.00  711.62  783,356.50 
6057+040.00  0.0000  26.8210  0.00  62.59  10.00  0.00  0.00  625.92  782,730.58 
6057+060.00  0.0000  27.6780  0.00  54.50  10.00  0.00  0.00  544.99  782,185.59 
6057+080.00  0.0000  21.8840  0.00  49.56  10.00  0.00  0.00  495.62  781,689.97 
6057+100.00  0.0000  21.2260  0.00  43.11  10.00  0.00  0.00  431.10  781,258.87 
6057+120.00  0.0000  26.5000  0.00  47.73  10.00  0.00  0.00  477.26  780,781.61 
6057+140.00  0.0000  25.5400  0.00  52.04  10.00  0.00  0.00  520.40  780,261.21 
6057+160.00  0.0000  23.5180  0.00  49.06  10.00  0.00  0.00  490.58  779,770.63 
6057+180.00  0.0000  31.4570  0.00  54.98  10.00  0.00  0.00  549.75  779,220.88 
6057+200.00  0.0000  14.8490  0.00  46.31  10.00  0.00  0.00  463.06  778,757.82 
6057+220.00  0.0000  26.8470  0.00  41.70  10.00  0.00  0.00  416.96  778,340.86 
6057+240.00  0.0000  35.6570  0.00  62.50  10.00  0.00  0.00  625.04  777,715.82 
6057+260.00  0.0000  21.0090  0.00  56.67  10.00  0.00  0.00  566.66  777,149.16 
6057+270.00  0.0000  9.3390  0.00  30.35  5.00  0.00  0.00  151.74  776,997.42 
6057+270.00  0.0000  7.5390  0.00  16.88  0.00  0.00  0.00  0.00  776,997.42 
6057+280.00  0.0000  7.9880  0.00  15.53  5.00  0.00  0.00  77.64  776,919.78 
6057+300.00  0.0000  28.3130  0.00  36.30  10.00  0.00  0.00  363.01  776,556.77 
6057+320.00  0.0000  28.8430  0.00  57.16  10.00  0.00  0.00  571.56  775,985.21 
6057+340.00  0.0000  17.7920  0.00  46.64  10.00  0.00  0.00  466.35  775,518.86 
6057+340.00  0.0000  20.9540  0.00  38.75  0.00  0.00  0.00  0.00  775,518.86 
6057+360.00  0.0000  15.6540  0.00  36.61  10.00  0.00  0.00  366.08  775,152.78 
6057+380.00  2.9950  7.3080  3.00  22.96  10.00  29.95  38.94  229.62  774,962.10 
6057+400.00  2.4960  9.7660  5.49  17.07  10.00  54.91  71.38  170.74  774,862.74 
6057+420.00  3.9680  0.1380  6.46  9.90  10.00  64.64  84.03  99.04  774,847.73 
6057+440.00  10.6690  0.1310  14.64  0.27  10.00  146.37  190.28  2.69  775,035.32 
6057+460.00  18.1080  0.1400  28.78  0.27  10.00  287.77  374.10  2.71  775,406.71 
6057+480.00  0.0000  21.2320  18.11  21.37  10.00  181.08  235.40  213.72  775,428.40 
6057+500.00  0.0000  25.1720  0.00  46.40  10.00  0.00  0.00  464.04  774,964.36 
6057+520.00  0.0000  27.9210  0.00  53.09  10.00  0.00  0.00  530.93  774,433.43 

296 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6057+540.00  0.0000  19.1780  0.00  47.10  10.00  0.00  0.00  470.99  773,962.44 
6057+560.00  0.6600  10.3530  0.66  29.53  10.00  6.60  8.58  295.31  773,675.71 
6057+580.00  0.0000  10.6820  0.66  21.04  10.00  6.60  8.58  210.35  773,473.94 
6057+600.00  0.0000  16.9990  0.00  27.68  10.00  0.00  0.00  276.81  773,197.13 
6057+620.00  0.0000  17.0230  0.00  34.02  10.00  0.00  0.00  340.22  772,856.91 
6057+640.00  0.0000  22.9940  0.00  40.02  10.00  0.00  0.00  400.17  772,456.74 
6057+660.00  0.0000  29.9050  0.00  52.90  10.00  0.00  0.00  528.99  771,927.75 
6057+680.00  0.0000  21.8470  0.00  51.75  10.00  0.00  0.00  517.52  771,410.23 
6057+700.00  0.0000  32.5110  0.00  54.36  10.00  0.00  0.00  543.58  770,866.65 
6057+720.00  0.0000  21.1410  0.00  53.65  10.00  0.00  0.00  536.52  770,330.13 
6057+740.00  0.0000  33.1100  0.00  54.25  10.00  0.00  0.00  542.51  769,787.62 
6057+760.00  0.0000  34.7350  0.00  67.85  10.00  0.00  0.00  678.45  769,109.17 
6057+780.00  0.0000  30.6610  0.00  65.40  10.00  0.00  0.00  653.96  768,455.21 
6057+800.00  0.0000  29.9950  0.00  60.66  10.00  0.00  0.00  606.56  767,848.65 
6057+820.00  0.0000  31.4250  0.00  61.42  10.00  0.00  0.00  614.20  767,234.45 
6057+840.00  0.0000  29.1540  0.00  60.58  10.00  0.00  0.00  605.79  766,628.66 
6057+860.00  3.7220  7.9700  3.72  37.12  10.00  37.22  48.39  371.24  766,305.80 
6057+880.00  0.0000  13.5640  3.72  21.53  10.00  37.22  48.39  215.34  766,138.85 
6057+900.00  0.0000  18.5990  0.00  32.16  10.00  0.00  0.00  321.63  765,817.22 
6057+920.00  0.0000  33.2720  0.00  51.87  10.00  0.00  0.00  518.71  765,298.51 
6057+940.00  0.0000  35.6880  0.00  68.96  10.00  0.00  0.00  689.60  764,608.91 
6057+960.00  0.0000  22.4800  0.00  58.17  10.00  0.00  0.00  581.68  764,027.23 
6057+980.00  0.5720  5.5500  0.57  28.03  10.00  5.72  7.44  280.30  763,754.37 
6058+000.00  0.4630  9.7210  1.04  15.27  10.00  10.35  13.46  152.71  763,615.11 
6058+020.00  0.0000  14.2830  0.46  24.00  10.00  4.63  6.02  240.04  763,381.09 
6058+040.00  0.0000  27.5310  0.00  41.81  10.00  0.00  0.00  418.14  762,962.95 
6058+060.00  0.5140  11.0360  0.51  38.57  10.00  5.14  6.68  385.67  762,583.96 
6058+080.00  0.0000  10.9100  0.51  21.95  10.00  5.14  6.68  219.46  762,371.18 
6058+100.00  0.0000  12.1260  0.00  23.04  10.00  0.00  0.00  230.36  762,140.82 
6058+120.00  0.5130  3.8620  0.51  15.99  10.00  5.13  6.67  159.88  761,987.61 
6058+140.00  0.0000  23.6020  0.51  27.46  10.00  5.13  6.67  274.64  761,719.64 
6058+160.00  0.5400  4.6750  0.54  28.28  10.00  5.40  7.02  282.77  761,443.89 
6058+180.00  0.0000  15.7310  0.54  20.41  10.00  5.40  7.02  204.06  761,246.85 
6058+200.00  0.0000  19.9420  0.00  35.67  10.00  0.00  0.00  356.73  760,890.12 
6058+220.00  0.0000  18.3120  0.00  38.25  10.00  0.00  0.00  382.54  760,507.58 
6058+240.00  0.0000  16.8500  0.00  35.16  10.00  0.00  0.00  351.62  760,155.96 
6058+260.00  0.0000  34.2110  0.00  51.06  10.00  0.00  0.00  510.61  759,645.35 
6058+280.00  0.0000  32.9350  0.00  67.15  10.00  0.00  0.00  671.46  758,973.89 
6058+300.00  0.0000  9.3230  0.00  42.26  10.00  0.00  0.00  422.58  758,551.31 
6058+320.00  0.0000  13.9140  0.00  23.24  10.00  0.00  0.00  232.37  758,318.94 
6058+340.00  0.0000  21.5690  0.00  35.48  10.00  0.00  0.00  354.83  757,964.11 
6058+360.00  0.9140  15.2840  0.91  36.85  10.00  9.14  11.88  368.53  757,607.46 
6058+380.00  0.0000  30.3800  0.91  45.66  10.00  9.14  11.88  456.64  757,162.71 
6058+400.00  0.0000  33.5690  0.00  63.95  10.00  0.00  0.00  639.49  756,523.22 
6058+420.00  0.0000  33.5930  0.00  67.16  10.00  0.00  0.00  671.62  755,851.60 

297 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6058+440.00  0.0000  18.3570  0.00  51.95  10.00  0.00  0.00  519.50  755,332.10 
6058+460.00  0.0000  19.3220  0.00  37.68  10.00  0.00  0.00  376.79  754,955.31 
6058+480.00  0.0000  25.4890  0.00  44.81  10.00  0.00  0.00  448.11  754,507.20 
6058+500.00  0.0000  15.0580  0.00  40.55  10.00  0.00  0.00  405.47  754,101.73 
6058+520.00  0.0000  23.1340  0.00  38.19  10.00  0.00  0.00  381.92  753,719.81 
6058+540.00  0.0000  12.9660  0.00  36.10  10.00  0.00  0.00  361.00  753,358.81 
6058+560.00  1.1970  5.1030  1.20  18.07  10.00  11.97  15.56  180.69  753,193.68 
6058+580.00  0.0000  21.1770  1.20  26.28  10.00  11.97  15.56  262.80  752,946.44 
6058+600.00  0.0000  19.2620  0.00  40.44  10.00  0.00  0.00  404.39  752,542.05 
6058+620.00  0.0000  16.2760  0.00  35.54  10.00  0.00  0.00  355.38  752,186.67 
6058+640.00  0.0000  13.3320  0.00  29.61  10.00  0.00  0.00  296.08  751,890.59 
6058+660.00  0.0000  27.7280  0.00  41.06  10.00  0.00  0.00  410.60  751,479.99 
6058+680.00  0.0000  19.9940  0.00  47.72  10.00  0.00  0.00  477.22  751,002.77 
6058+700.00  1.1390  13.5170  1.14  33.51  10.00  11.39  14.81  335.11  750,682.47 
6058+720.00  1.3390  6.8410  2.48  20.36  10.00  24.78  32.21  203.58  750,511.10 
6058+740.00  0.0000  20.6680  1.34  27.51  10.00  13.39  17.41  275.09  750,253.42 
6058+760.00  0.0000  21.5700  0.00  42.24  10.00  0.00  0.00  422.38  749,831.04 
6058+780.00  0.9770  3.3580  0.98  24.93  10.00  9.77  12.70  249.28  749,594.46 
6058+800.00  0.0000  20.5380  0.98  23.90  10.00  9.77  12.70  238.96  749,368.20 
6058+820.00  0.0000  19.0080  0.00  39.55  10.00  0.00  0.00  395.46  748,972.74 
6058+840.00  4.8450  0.1360  4.85  19.14  10.00  48.45  62.99  191.44  748,844.28 
6058+860.00  9.6970  0.1250  14.54  0.26  10.00  145.42  189.05  2.61  749,030.72 
6058+880.00  9.3200  0.1340  19.02  0.26  10.00  190.17  247.22  2.59  749,275.35 
6058+900.00  0.0000  17.2100  9.32  17.34  10.00  93.20  121.16  173.44  749,223.07 
6058+920.00  0.0000  24.9430  0.00  42.15  10.00  0.00  0.00  421.53  748,801.54 
6058+940.00  0.0000  22.8560  0.00  47.80  10.00  0.00  0.00  477.99  748,323.55 
6058+960.00  0.0000  19.6210  0.00  42.48  10.00  0.00  0.00  424.77  747,898.78 
6058+980.00  0.0000  17.9670  0.00  37.59  10.00  0.00  0.00  375.88  747,522.90 
6059+000.00  0.0000  17.6320  0.00  35.60  10.00  0.00  0.00  355.99  747,166.91 
6059+020.00  0.0000  19.5530  0.00  37.19  10.00  0.00  0.00  371.85  746,795.06 
6059+040.00  0.6140  14.9500  0.61  34.50  10.00  6.14  7.98  345.03  746,458.01 
6059+060.00  0.0000  21.6680  0.61  36.62  10.00  6.14  7.98  366.18  746,099.81 
6059+080.00  0.0000  18.8690  0.00  40.54  10.00  0.00  0.00  405.37  745,694.44 
6059+100.00  0.0000  19.9120  0.00  38.78  10.00  0.00  0.00  387.81  745,306.63 
6059+120.00  0.7300  15.4590  0.73  35.37  10.00  7.30  9.49  353.71  744,962.41 
6059+140.00  0.5620  13.9020  1.29  29.36  10.00  12.92  16.80  293.61  744,685.60 
6059+160.00  0.0000  19.2380  0.56  33.14  10.00  5.62  7.31  331.40  744,361.51 
6059+180.00  0.5970  11.7430  0.60  30.98  10.00  5.97  7.76  309.81  744,059.46 
6059+200.00  0.0000  21.7510  0.60  33.49  10.00  5.97  7.76  334.94  743,732.28 
6059+220.00  0.0000  16.2860  0.00  38.04  10.00  0.00  0.00  380.37  743,351.91 
6059+240.00  0.0000  23.4090  0.00  39.70  10.00  0.00  0.00  396.95  742,954.96 
6059+260.00  1.9900  0.4290  1.99  23.84  10.00  19.90  25.87  238.38  742,742.45 
6059+280.00  0.0000  12.3780  1.99  12.81  10.00  19.90  25.87  128.07  742,640.25 
6059+300.00  1.6140  7.3390  1.61  19.72  10.00  16.14  20.98  197.17  742,464.06 
6059+320.00  0.0000  23.3380  1.61  30.68  10.00  16.14  20.98  306.77  742,178.27 

298 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6059+340.00  0.0000  32.3110  0.00  55.65  10.00  0.00  0.00  556.49  741,621.78 
6059+360.00  0.0000  33.9050  0.00  66.22  10.00  0.00  0.00  662.16  740,959.62 
6059+380.00  0.0000  29.6460  0.00  63.55  10.00  0.00  0.00  635.51  740,324.11 
6059+400.00  0.0000  17.0910  0.00  46.74  10.00  0.00  0.00  467.37  739,856.74 
6059+420.00  0.0000  7.4510  0.00  24.54  10.00  0.00  0.00  245.42  739,611.32 
6059+440.00  0.0000  9.1700  0.00  16.62  10.00  0.00  0.00  166.21  739,445.11 
6059+460.00  0.0000  11.7070  0.00  20.88  10.00  0.00  0.00  208.77  739,236.34 
6059+480.00  1.0310  10.5800  1.03  22.29  10.00  10.31  13.40  222.87  739,026.88 
6059+500.00  0.6140  10.8880  1.65  21.47  10.00  16.45  21.39  214.68  738,833.58 
6059+520.00  0.0000  9.2940  0.61  20.18  10.00  6.14  7.98  201.82  738,639.74 
6059+540.00  0.0000  19.4030  0.00  28.70  10.00  0.00  0.00  286.97  738,352.77 
6059+560.00  0.0000  27.3570  0.00  46.76  10.00  0.00  0.00  467.60  737,885.17 
6059+580.00  0.0000  24.2290  0.00  51.59  10.00  0.00  0.00  515.86  737,369.31 
6059+600.00  0.0000  22.0720  0.00  46.30  10.00  0.00  0.00  463.01  736,906.30 
6059+620.00  0.0000  21.3830  0.00  43.46  10.00  0.00  0.00  434.55  736,471.75 
6059+640.00  0.0000  22.0540  0.00  43.44  10.00  0.00  0.00  434.37  736,037.38 
6059+660.00  0.0000  18.2830  0.00  40.34  10.00  0.00  0.00  403.37  735,634.01 
6059+680.00  1.0530  7.9540  1.05  26.24  10.00  10.53  13.69  262.37  735,385.33 
6059+700.00  0.5260  8.8810  1.58  16.84  10.00  15.79  20.53  168.35  735,237.51 
6059+720.00  0.0000  10.2590  0.53  19.14  10.00  5.26  6.84  191.40  735,052.95 
6059+740.00  0.0000  11.0190  0.00  21.28  10.00  0.00  0.00  212.78  734,840.17 
6059+760.00  0.0000  14.1630  0.00  25.18  10.00  0.00  0.00  251.82  734,588.35 
6059+780.00  0.0000  8.5200  0.00  22.68  10.00  0.00  0.00  226.83  734,361.52 
6059+800.00  0.0000  7.7760  0.00  16.30  10.00  0.00  0.00  162.96  734,198.56 
6059+820.00  1.0080  9.7530  1.01  17.53  10.00  10.08  13.10  175.29  734,036.37 
6059+840.00  0.0000  15.7360  1.01  25.49  10.00  10.08  13.10  254.89  733,794.58 
6059+860.00  0.5340  13.7970  0.53  29.53  10.00  5.34  6.94  295.33  733,506.20 
6059+880.00  0.0000  22.1080  0.53  35.91  10.00  5.34  6.94  359.05  733,154.09 
6059+900.00  0.0000  16.6470  0.00  38.76  10.00  0.00  0.00  387.55  732,766.54 
6059+920.00  0.0000  9.8310  0.00  26.48  10.00  0.00  0.00  264.78  732,501.76 
6059+940.00  0.0000  19.2800  0.00  29.11  10.00  0.00  0.00  291.11  732,210.65 
6059+960.00  0.0000  17.3250  0.00  36.61  10.00  0.00  0.00  366.05  731,844.60 
6059+980.00  0.0000  13.9970  0.00  31.32  10.00  0.00  0.00  313.22  731,531.38 
6060+000.00  0.0000  24.3040  0.00  38.30  10.00  0.00  0.00  383.01  731,148.37 
6060+020.00  0.0000  25.4920  0.00  49.80  10.00  0.00  0.00  497.96  730,650.41 
6060+040.00  0.0000  24.1260  0.00  49.62  10.00  0.00  0.00  496.18  730,154.23 
6060+060.00  0.0000  18.5160  0.00  42.64  10.00  0.00  0.00  426.42  729,727.81 
6060+080.00  0.0000  15.8530  0.00  34.37  10.00  0.00  0.00  343.69  729,384.12 
6060+100.00  0.0000  20.6930  0.00  36.55  10.00  0.00  0.00  365.46  729,018.66 
6060+120.00  0.0000  13.8660  0.00  34.56  10.00  0.00  0.00  345.59  728,673.07 
6060+140.00  0.0000  16.5270  0.00  30.39  10.00  0.00  0.00  303.93  728,369.14 
6060+160.00  0.0000  13.8830  0.00  30.41  10.00  0.00  0.00  304.10  728,065.04 
6060+180.00  0.0000  19.6940  0.00  33.58  10.00  0.00  0.00  335.77  727,729.27 
6060+200.00  1.6740  8.5380  1.67  28.23  10.00  16.74  21.76  282.32  727,468.71 
6060+220.00  0.5850  15.4970  2.26  24.04  10.00  22.59  29.37  240.35  727,257.73 

299 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6060+240.00  0.0000  31.6120  0.59  47.11  10.00  5.85  7.61  471.09  726,794.24 
6060+260.00  0.0000  38.8550  0.00  70.47  10.00  0.00  0.00  704.67  726,089.57 
6060+280.00  0.0000  37.3180  0.00  76.17  10.00  0.00  0.00  761.73  725,327.84 
6060+300.00  0.0000  29.1700  0.00  66.49  10.00  0.00  0.00  664.88  724,662.96 
6060+320.00  0.0000  30.7450  0.00  59.92  10.00  0.00  0.00  599.15  724,063.81 
6060+340.00  0.0000  18.3890  0.00  49.13  10.00  0.00  0.00  491.34  723,572.47 
6060+360.00  1.4300  3.4770  1.43  21.87  10.00  14.30  18.59  218.66  723,372.40 
6060+380.00  5.1460  0.1300  6.58  3.61  10.00  65.76  85.49  36.07  723,421.82 
6060+400.00  0.0000  17.1000  5.15  17.23  10.00  51.46  66.90  172.30  723,316.42 
6060+420.00  0.0000  24.2800  0.00  41.38  10.00  0.00  0.00  413.80  722,902.62 
6060+440.00  0.0000  12.0160  0.00  36.30  10.00  0.00  0.00  362.96  722,539.66 
6060+460.00  0.0000  9.3420  0.00  21.36  10.00  0.00  0.00  213.58  722,326.08 
6060+480.00  0.0000  12.8380  0.00  22.18  10.00  0.00  0.00  221.80  722,104.28 
6060+500.00  0.0000  13.9130  0.00  26.75  10.00  0.00  0.00  267.51  721,836.77 
6060+520.00  0.0000  17.0900  0.00  31.00  10.00  0.00  0.00  310.03  721,526.74 
6060+540.00  0.6890  16.8710  0.69  33.96  10.00  6.89  8.96  339.61  721,196.09 
6060+560.00  0.0000  31.2150  0.69  48.09  10.00  6.89  8.96  480.86  720,724.18 
6060+580.00  0.0000  17.3180  0.00  48.53  10.00  0.00  0.00  485.33  720,238.85 
6060+600.00  0.4450  8.2740  0.45  25.59  10.00  4.45  5.79  255.92  719,988.72 
6060+620.00  0.0000  21.6790  0.45  29.95  10.00  4.45  5.79  299.53  719,694.97 
6060+640.00  0.0000  27.0990  0.00  48.78  10.00  0.00  0.00  487.78  719,207.19 
6060+660.00  0.0000  9.7600  0.00  36.86  10.00  0.00  0.00  368.59  718,838.60 
6060+680.00  0.0000  21.4000  0.00  31.16  10.00  0.00  0.00  311.60  718,527.00 
6060+700.00  0.0000  17.5910  0.00  38.99  10.00  0.00  0.00  389.91  718,137.09 
6060+720.00  0.5830  13.3760  0.58  30.97  10.00  5.83  7.58  309.67  717,835.00 
6060+740.00  0.0000  13.1110  0.58  26.49  10.00  5.83  7.58  264.87  717,577.71 
6060+760.00  8.8200  0.1430  8.82  13.25  10.00  88.20  114.66  132.54  717,559.83 
6060+780.00  2.1840  5.5680  11.00  5.71  10.00  110.04  143.05  57.11  717,645.77 
6060+800.00  0.0000  17.6320  2.18  23.20  10.00  21.84  28.39  232.00  717,442.16 
6060+820.00  5.9050  0.1180  5.91  17.75  10.00  59.05  76.77  177.50  717,341.43 
6060+840.00  0.0000  10.3640  5.91  10.48  10.00  59.05  76.77  104.82  717,313.37 
6060+860.00  0.0000  20.6590  0.00  31.02  10.00  0.00  0.00  310.23  717,003.14 
6060+880.00  0.0000  13.8340  0.00  34.49  10.00  0.00  0.00  344.93  716,658.21 
6060+900.00  0.0000  23.9530  0.00  37.79  10.00  0.00  0.00  377.87  716,280.34 
6060+920.00  0.0000  27.2240  0.00  51.18  10.00  0.00  0.00  511.77  715,768.57 
6060+940.00  0.0000  21.9920  0.00  49.22  10.00  0.00  0.00  492.16  715,276.41 
6060+960.00  0.0000  19.0850  0.00  41.08  10.00  0.00  0.00  410.77  714,865.64 
6060+980.00  0.0000  28.3520  0.00  47.44  10.00  0.00  0.00  474.37  714,391.27 
6061+000.00  0.0000  32.5110  0.00  60.86  10.00  0.00  0.00  608.63  713,782.64 
6061+020.00  0.0000  23.4320  0.00  55.94  10.00  0.00  0.00  559.43  713,223.21 
6061+040.00  0.0000  24.3170  0.00  47.75  10.00  0.00  0.00  477.49  712,745.72 
6061+060.00  0.0000  22.9080  0.00  47.23  10.00  0.00  0.00  472.25  712,273.47 
6061+080.00  0.0000  34.5790  0.00  57.49  10.00  0.00  0.00  574.87  711,698.60 
6061+100.00  0.0000  29.6940  0.00  64.27  10.00  0.00  0.00  642.73  711,055.87 
6061+120.00  0.0000  22.0190  0.00  51.71  10.00  0.00  0.00  517.13  710,538.74 

300 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6061+140.00  0.0000  12.3490  0.00  34.37  10.00  0.00  0.00  343.68  710,195.06 
6061+160.00  0.5150  11.1640  0.52  23.51  10.00  5.15  6.70  235.13  709,966.63 
6061+180.00  0.0000  11.7270  0.52  22.89  10.00  5.15  6.70  228.91  709,744.41 
6061+200.00  0.0000  31.5330  0.00  43.26  10.00  0.00  0.00  432.60  709,311.81 
6061+220.00  0.0000  34.1670  0.00  65.70  10.00  0.00  0.00  657.00  708,654.81 
6061+240.00  0.0000  25.9860  0.00  60.15  10.00  0.00  0.00  601.53  708,053.28 
6061+260.00  0.0000  32.8250  0.00  58.81  10.00  0.00  0.00  588.11  707,465.17 
6061+280.00  0.0000  20.8890  0.00  53.71  10.00  0.00  0.00  537.14  706,928.03 
6061+300.00  0.0000  22.1560  0.00  43.05  10.00  0.00  0.00  430.45  706,497.58 
6061+320.00  0.0000  26.2140  0.00  48.37  10.00  0.00  0.00  483.70  706,013.88 
6061+340.00  0.0000  26.5500  0.00  52.76  10.00  0.00  0.00  527.64  705,486.24 
6061+360.00  0.0000  20.1290  0.00  46.68  10.00  0.00  0.00  466.79  705,019.45 
6061+380.00  0.0000  15.5500  0.00  35.68  10.00  0.00  0.00  356.79  704,662.66 
6061+400.00  0.0000  18.1150  0.00  33.67  10.00  0.00  0.00  336.65  704,326.01 
6061+420.00  0.0000  23.0600  0.00  41.18  10.00  0.00  0.00  411.75  703,914.26 
6061+440.00  0.0000  15.6320  0.00  38.69  10.00  0.00  0.00  386.92  703,527.34 
6061+460.00  0.0000  14.7460  0.00  30.38  10.00  0.00  0.00  303.78  703,223.56 
6061+480.00  0.0000  23.9280  0.00  38.67  10.00  0.00  0.00  386.74  702,836.82 
6061+500.00  0.5600  10.4530  0.56  34.38  10.00  5.60  7.28  343.81  702,500.29 
6061+520.00  0.0000  21.4430  0.56  31.90  10.00  5.60  7.28  318.96  702,188.61 
6061+540.00  0.0000  28.5230  0.00  49.97  10.00  0.00  0.00  499.66  701,688.95 
6061+560.00  0.0000  23.8700  0.00  52.39  10.00  0.00  0.00  523.93  701,165.02 
6061+580.00  0.7700  8.8130  0.77  32.68  10.00  7.70  10.01  326.83  700,848.20 
6061+600.00  2.1860  3.7490  2.96  12.56  10.00  29.56  38.43  125.62  700,761.01 
6061+620.00  0.0000  17.3600  2.19  21.11  10.00  21.86  28.42  211.09  700,578.34 
6061+640.00  0.0000  23.3670  0.00  40.73  10.00  0.00  0.00  407.27  700,171.07 
6061+660.00  0.0000  12.1720  0.00  35.54  10.00  0.00  0.00  355.39  699,815.68 
6061+680.00  0.0000  27.1410  0.00  39.31  10.00  0.00  0.00  393.13  699,422.55 
6061+700.00  0.0000  22.4350  0.00  49.58  10.00  0.00  0.00  495.76  698,926.79 
6061+720.00  0.0000  11.8690  0.00  34.30  10.00  0.00  0.00  343.04  698,583.75 
6061+740.00  0.0000  26.4370  0.00  38.31  10.00  0.00  0.00  383.06  698,200.69 
6061+760.00  0.0000  34.9140  0.00  61.35  10.00  0.00  0.00  613.51  697,587.18 
6061+780.00  0.0000  29.1010  0.00  64.02  10.00  0.00  0.00  640.15  696,947.03 
6061+800.00  0.0000  34.6450  0.00  63.75  10.00  0.00  0.00  637.46  696,309.57 
6061+820.00  0.0000  55.7460  0.00  90.39  10.00  0.00  0.00  903.91  695,405.66 
6061+840.00  0.0000  56.3210  0.00  112.07  10.00  0.00  0.00  1,120.67  694,284.99 
6061+860.00  0.0000  52.9050  0.00  109.23  10.00  0.00  0.00  1,092.26  693,192.73 
6061+880.00  0.0000  45.3660  0.00  98.27  10.00  0.00  0.00  982.71  692,210.02 
6061+900.00  0.0000  44.2510  0.00  89.62  10.00  0.00  0.00  896.17  691,313.85 
6061+920.00  0.0000  62.3930  0.00  106.64  10.00  0.00  0.00  1,066.44  690,247.41 
6061+940.00  0.0000  60.2400  0.00  122.63  10.00  0.00  0.00  1,226.33  689,021.08 
6061+960.00  0.0000  47.0930  0.00  107.33  10.00  0.00  0.00  1,073.33  687,947.75 
6061+980.00  0.0000  32.6540  0.00  79.75  10.00  0.00  0.00  797.47  687,150.28 
6062+000.00  0.0000  22.9470  0.00  55.60  10.00  0.00  0.00  556.01  686,594.27 
6062+020.00  0.0000  14.5560  0.00  37.50  10.00  0.00  0.00  375.03  686,219.24 

301 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6062+040.00  0.0000  17.7420  0.00  32.30  10.00  0.00  0.00  322.98  685,896.26 
6062+060.00  1.3860  7.7930  1.39  25.54  10.00  13.86  18.02  255.35  685,658.93 
6062+080.00  1.5140  7.7030  2.90  15.50  10.00  29.00  37.70  154.96  685,541.67 
6062+100.00  0.0000  26.9740  1.51  34.68  10.00  15.14  19.68  346.77  685,214.58 
6062+120.00  0.0000  33.6440  0.00  60.62  10.00  0.00  0.00  606.18  684,608.40 
6062+140.00  0.0000  32.2830  0.00  65.93  10.00  0.00  0.00  659.27  683,949.13 
6062+160.00  0.0000  28.8380  0.00  61.12  10.00  0.00  0.00  611.21  683,337.92 
6062+180.00  0.0000  29.3730  0.00  58.21  10.00  0.00  0.00  582.11  682,755.81 
6062+200.00  0.0000  26.3940  0.00  55.77  10.00  0.00  0.00  557.67  682,198.14 
6062+220.00  0.0000  19.8870  0.00  46.28  10.00  0.00  0.00  462.81  681,735.33 
6062+240.00  0.0000  22.0610  0.00  41.95  10.00  0.00  0.00  419.48  681,315.85 
6062+260.00  0.0000  28.6190  0.00  50.68  10.00  0.00  0.00  506.80  680,809.05 
6062+280.00  0.0000  31.5450  0.00  60.16  10.00  0.00  0.00  601.64  680,207.41 
6062+300.00  0.0000  28.6890  0.00  60.23  10.00  0.00  0.00  602.34  679,605.07 
6062+320.00  0.0000  27.0700  0.00  55.76  10.00  0.00  0.00  557.59  679,047.48 
6062+340.00  0.0000  27.5610  0.00  54.63  10.00  0.00  0.00  546.31  678,501.17 
6062+360.00  0.0000  19.4910  0.00  47.05  10.00  0.00  0.00  470.52  678,030.65 
6062+380.00  0.0000  10.5690  0.00  30.06  10.00  0.00  0.00  300.60  677,730.05 
6062+400.00  0.0000  20.5340  0.00  31.10  10.00  0.00  0.00  311.03  677,419.02 
6062+420.00  0.0000  29.5900  0.00  50.12  10.00  0.00  0.00  501.24  676,917.78 
6062+440.00  0.0000  31.8690  0.00  61.46  10.00  0.00  0.00  614.59  676,303.19 
6062+460.00  0.0000  32.2380  0.00  64.11  10.00  0.00  0.00  641.07  675,662.12 
6062+480.00  0.0000  27.9880  0.00  60.23  10.00  0.00  0.00  602.26  675,059.86 
6062+500.00  0.0000  24.9630  0.00  52.95  10.00  0.00  0.00  529.51  674,530.35 
6062+520.00  0.0000  25.5550  0.00  50.52  10.00  0.00  0.00  505.18  674,025.17 
6062+540.00  0.0000  34.9270  0.00  60.48  10.00  0.00  0.00  604.82  673,420.35 
6062+560.00  0.0000  38.4440  0.00  73.37  10.00  0.00  0.00  733.71  672,686.64 
6062+580.00  0.0000  37.7900  0.00  76.23  10.00  0.00  0.00  762.34  671,924.30 
6062+600.00  0.0000  35.4510  0.00  73.24  10.00  0.00  0.00  732.41  671,191.89 
6062+620.00  0.0000  27.1210  0.00  62.57  10.00  0.00  0.00  625.72  670,566.17 
6062+640.00  0.0000  24.8030  0.00  51.92  10.00  0.00  0.00  519.24  670,046.93 
6062+660.00  0.6140  9.9160  0.61  34.72  10.00  6.14  7.98  347.19  669,707.72 
6062+680.00  0.0000  22.9370  0.61  32.85  10.00  6.14  7.98  328.53  669,387.17 
6062+700.00  0.9450  8.9200  0.95  31.86  10.00  9.45  12.29  318.57  669,080.89 
6062+720.00  0.0000  20.5190  0.95  29.44  10.00  9.45  12.29  294.39  668,798.78 
6062+740.00  0.0000  39.9690  0.00  60.49  10.00  0.00  0.00  604.88  668,193.90 
6062+760.00  0.0000  43.2010  0.00  83.17  10.00  0.00  0.00  831.70  667,362.20 
6062+780.00  0.0000  37.1840  0.00  80.39  10.00  0.00  0.00  803.85  666,558.35 
6062+800.00  0.0000  24.5640  0.00  61.75  10.00  0.00  0.00  617.48  665,940.87 
6062+820.00  0.7150  4.9790  0.72  29.54  10.00  7.15  9.30  295.43  665,654.74 
6062+840.00  9.9780  0.4580  10.69  5.44  10.00  106.93  139.01  54.37  665,739.38 
6062+860.00  11.9720  0.1420  21.95  0.60  10.00  219.50  285.35  6.00  666,018.73 
6062+880.00  0.9420  9.3210  12.91  9.46  10.00  129.14  167.88  94.63  666,091.98 
6062+900.00  0.0000  19.7360  0.94  29.06  10.00  9.42  12.25  290.57  665,813.66 
6062+920.00  0.0000  23.0020  0.00  42.74  10.00  0.00  0.00  427.38  665,386.28 

302 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6062+940.00  0.0000  22.4520  0.00  45.45  10.00  0.00  0.00  454.54  664,931.74 
6062+960.00  0.0000  12.5530  0.00  35.01  10.00  0.00  0.00  350.05  664,581.69 
6062+980.00  0.6730  13.3300  0.67  25.88  10.00  6.73  8.75  258.83  664,331.61 
6063+000.00  0.0000  22.7520  0.67  36.08  10.00  6.73  8.75  360.82  663,979.53 
6063+020.00  0.0000  22.5450  0.00  45.30  10.00  0.00  0.00  452.97  663,526.56 
6063+040.00  0.0000  12.5330  0.00  35.08  10.00  0.00  0.00  350.78  663,175.78 
6063+060.00  0.0000  9.0420  0.00  21.58  10.00  0.00  0.00  215.75  662,960.03 
6063+080.00  0.0000  15.1080  0.00  24.15  10.00  0.00  0.00  241.50  662,718.53 
6063+100.00  3.6500  9.6060  3.65  24.71  10.00  36.50  47.45  247.14  662,518.84 
6063+120.00  4.0550  2.6730  7.71  12.28  10.00  77.05  100.17  122.79  662,496.22 
6063+140.00  0.0000  27.6680  4.06  30.34  10.00  40.55  52.72  303.41  662,245.52 
6063+160.00  0.0000  41.5190  0.00  69.19  10.00  0.00  0.00  691.87  661,553.65 
6063+180.00  0.0000  33.3420  0.00  74.86  10.00  0.00  0.00  748.61  660,805.04 
6063+200.00  0.0000  26.2130  0.00  59.56  10.00  0.00  0.00  595.55  660,209.49 
6063+220.00  0.0000  35.6690  0.00  61.88  10.00  0.00  0.00  618.82  659,590.67 
6063+240.00  0.0000  38.8630  0.00  74.53  10.00  0.00  0.00  745.32  658,845.35 
6063+260.00  0.0000  33.6650  0.00  72.53  10.00  0.00  0.00  725.28  658,120.07 
6063+280.00  0.0000  23.6300  0.00  57.30  10.00  0.00  0.00  572.95  657,547.12 
6063+300.00  0.0000  25.3790  0.00  49.01  10.00  0.00  0.00  490.09  657,057.03 
6063+320.00  0.0000  20.2760  0.00  45.66  10.00  0.00  0.00  456.55  656,600.48 
6063+340.00  0.0000  38.5830  0.00  58.86  10.00  0.00  0.00  588.59  656,011.89 
6063+360.00  0.0000  28.0170  0.00  66.60  10.00  0.00  0.00  666.00  655,345.89 
6063+380.00  0.0000  26.8390  0.00  54.86  10.00  0.00  0.00  548.56  654,797.33 
6063+400.00  0.0000  25.1800  0.00  52.02  10.00  0.00  0.00  520.19  654,277.14 
6063+420.00  0.0000  27.3040  0.00  52.48  10.00  0.00  0.00  524.84  653,752.30 
6063+440.00  1.6870  4.1020  1.69  31.41  10.00  16.87  21.93  314.06  653,460.18 
6063+460.00  0.7880  7.0250  2.48  11.13  10.00  24.75  32.18  111.27  653,381.08 
6063+480.00  0.0000  21.5490  0.79  28.57  10.00  7.88  10.24  285.74  653,105.58 
6063+500.00  0.0000  27.2270  0.00  48.78  10.00  0.00  0.00  487.76  652,617.82 
6063+520.00  3.2020  5.5630  3.20  32.79  10.00  32.02  41.63  327.90  652,331.55 
6063+540.00  5.6150  1.4050  8.82  6.97  10.00  88.17  114.62  69.68  652,376.49 
6063+560.00  0.0000  21.0800  5.62  22.49  10.00  56.15  73.00  224.85  652,224.64 
6063+580.00  0.0000  35.5560  0.00  56.64  10.00  0.00  0.00  566.36  651,658.28 
6063+600.00  0.0000  35.3970  0.00  70.95  10.00  0.00  0.00  709.53  650,948.75 
6063+620.00  0.0000  33.9660  0.00  69.36  10.00  0.00  0.00  693.63  650,255.12 
6063+640.00  0.0000  33.3560  0.00  67.32  10.00  0.00  0.00  673.22  649,581.90 
6063+660.00  0.0000  26.9100  0.00  60.27  10.00  0.00  0.00  602.66  648,979.24 
6063+680.00  0.0000  24.3940  0.00  51.30  10.00  0.00  0.00  513.04  648,466.20 
6063+700.00  0.0000  23.0860  0.00  47.48  10.00  0.00  0.00  474.80  647,991.40 
6063+720.00  0.0000  19.8620  0.00  42.95  10.00  0.00  0.00  429.48  647,561.92 
6063+740.00  1.8300  13.2820  1.83  33.14  10.00  18.30  23.79  331.44  647,254.27 
6063+760.00  0.0000  24.8410  1.83  38.12  10.00  18.30  23.79  381.23  646,896.83 
6063+780.00  0.0000  19.6940  0.00  44.54  10.00  0.00  0.00  445.35  646,451.48 
6063+800.00  0.0000  21.7240  0.00  41.42  10.00  0.00  0.00  414.18  646,037.30 
6063+820.00  0.0000  22.7140  0.00  44.44  10.00  0.00  0.00  444.38  645,592.92 

303 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6063+840.00  0.0000  21.0440  0.00  43.76  10.00  0.00  0.00  437.58  645,155.34 
6063+860.00  0.0000  30.5580  0.00  51.60  10.00  0.00  0.00  516.02  644,639.32 
6063+880.00  0.0000  13.9280  0.00  44.49  10.00  0.00  0.00  444.86  644,194.46 
6063+900.00  1.2300  3.1250  1.23  17.05  10.00  12.30  15.99  170.53  644,039.92 
6063+920.00  0.0000  28.4370  1.23  31.56  10.00  12.30  15.99  315.62  643,740.29 
6063+940.00  0.0000  23.1000  0.00  51.54  10.00  0.00  0.00  515.37  643,224.92 
6063+960.00  0.0000  23.0100  0.00  46.11  10.00  0.00  0.00  461.10  642,763.82 
6063+980.00  0.0000  32.6020  0.00  55.61  10.00  0.00  0.00  556.12  642,207.70 
6064+000.00  0.0000  34.2330  0.00  66.84  10.00  0.00  0.00  668.35  641,539.35 
6064+020.00  0.0000  27.4190  0.00  61.65  10.00  0.00  0.00  616.52  640,922.83 
6064+040.00  0.0000  12.6980  0.00  40.12  10.00  0.00  0.00  401.17  640,521.66 
6064+060.00  0.0000  7.9260  0.00  20.62  10.00  0.00  0.00  206.24  640,315.42 
6064+080.00  0.4430  15.1640  0.44  23.09  10.00  4.43  5.76  230.90  640,090.28 
6064+100.00  0.0000  15.4180  0.44  30.58  10.00  4.43  5.76  305.82  639,790.21 
6064+120.00  0.0000  21.0750  0.00  36.49  10.00  0.00  0.00  364.93  639,425.28 
6064+140.00  0.0000  18.1490  0.00  39.22  10.00  0.00  0.00  392.24  639,033.04 
6064+160.00  1.1190  12.1800  1.12  30.33  10.00  11.19  14.55  303.29  638,744.30 
6064+180.00  0.0000  17.6640  1.12  29.84  10.00  11.19  14.55  298.44  638,460.41 
6064+200.00  0.0000  22.0920  0.00  39.76  10.00  0.00  0.00  397.56  638,062.85 
6064+220.00  0.0000  20.4850  0.00  42.58  10.00  0.00  0.00  425.77  637,637.08 
6064+240.00  0.0000  22.5520  0.00  43.04  10.00  0.00  0.00  430.37  637,206.71 
6064+260.00  0.6000  19.4440  0.60  42.00  10.00  6.00  7.80  419.96  636,794.55 
6064+280.00  4.2360  5.8960  4.84  25.34  10.00  48.36  62.87  253.40  636,604.02 
6064+300.00  13.4450  0.1360  17.68  6.03  10.00  176.81  229.85  60.32  636,773.55 
6064+320.00  1.1680  9.3540  14.61  9.49  10.00  146.13  189.97  94.90  636,868.62 
6064+340.00  0.0000  24.1770  1.17  33.53  10.00  11.68  15.18  335.31  636,548.49 
6064+360.00  0.0000  19.7490  0.00  43.93  10.00  0.00  0.00  439.26  636,109.23 
6064+380.00  0.0000  12.6380  0.00  32.39  10.00  0.00  0.00  323.87  635,785.36 
6064+400.00  0.0000  22.6560  0.00  35.29  10.00  0.00  0.00  352.94  635,432.42 
6064+420.00  0.0000  14.4100  0.00  37.07  10.00  0.00  0.00  370.66  635,061.76 
6064+440.00  0.0000  19.9190  0.00  34.33  10.00  0.00  0.00  343.29  634,718.47 
6064+460.00  1.0840  7.9780  1.08  27.90  10.00  10.84  14.09  278.97  634,453.59 
6064+480.00  2.0020  14.8790  3.09  22.86  10.00  30.86  40.12  228.57  634,265.14 
6064+500.00  0.0000  31.9080  2.00  46.79  10.00  20.02  26.03  467.87  633,823.30 
6064+520.00  0.0000  36.2890  0.00  68.20  10.00  0.00  0.00  681.97  633,141.33 
6064+540.00  0.0000  31.0860  0.00  67.38  10.00  0.00  0.00  673.75  632,467.58 
6064+560.00  0.0000  28.4940  0.00  59.58  10.00  0.00  0.00  595.80  631,871.78 
6064+580.00  0.0000  12.7730  0.00  41.27  10.00  0.00  0.00  412.67  631,459.11 
6064+600.00  0.0000  28.4820  0.00  41.26  10.00  0.00  0.00  412.55  631,046.56 
6064+620.00  0.0000  24.2880  0.00  52.77  10.00  0.00  0.00  527.70  630,518.86 
6064+640.00  11.5560  0.0820  11.56  24.37  10.00  115.56  150.23  243.70  630,425.39 
6064+660.00  0.0000  12.9760  11.56  13.06  10.00  115.56  150.23  130.58  630,445.03 
6064+680.00  0.0000  29.7360  0.00  42.71  10.00  0.00  0.00  427.12  630,017.91 
6064+700.00  0.0000  32.6280  0.00  62.36  10.00  0.00  0.00  623.64  629,394.27 
6064+720.00  0.0000  30.7070  0.00  63.34  10.00  0.00  0.00  633.35  628,760.92 

304 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6064+740.00  0.0000  28.9530  0.00  59.66  10.00  0.00  0.00  596.60  628,164.32 
6064+760.00  0.0000  22.5640  0.00  51.52  10.00  0.00  0.00  515.17  627,649.15 
6064+780.00  0.0000  21.8420  0.00  44.41  10.00  0.00  0.00  444.06  627,205.09 
6064+800.00  0.0000  18.6910  0.00  40.53  10.00  0.00  0.00  405.33  626,799.76 
6064+820.00  0.0000  7.0290  0.00  25.72  10.00  0.00  0.00  257.20  626,542.56 
6064+840.00  0.0000  20.6330  0.00  27.66  10.00  0.00  0.00  276.62  626,265.94 
6064+860.00  0.0000  32.4610  0.00  53.09  10.00  0.00  0.00  530.94  625,735.00 
6064+880.00  0.0000  25.9450  0.00  58.41  10.00  0.00  0.00  584.06  625,150.94 
6064+900.00  0.0000  27.7990  0.00  53.74  10.00  0.00  0.00  537.44  624,613.50 
6064+920.00  0.0000  37.3800  0.00  65.18  10.00  0.00  0.00  651.79  623,961.71 
6064+940.00  0.0000  30.4570  0.00  67.84  10.00  0.00  0.00  678.37  623,283.34 
6064+960.00  0.0000  25.3060  0.00  55.76  10.00  0.00  0.00  557.63  622,725.71 
6064+980.00  0.0000  23.2850  0.00  48.59  10.00  0.00  0.00  485.91  622,239.80 
6065+000.00  0.0000  25.3550  0.00  48.64  10.00  0.00  0.00  486.40  621,753.40 
6065+020.00  0.0000  27.2420  0.00  52.60  10.00  0.00  0.00  525.97  621,227.43 
6065+040.00  0.0000  21.3570  0.00  48.60  10.00  0.00  0.00  485.99  620,741.44 
6065+060.00  1.8850  5.1880  1.89  26.55  10.00  18.85  24.51  265.45  620,500.50 
6065+080.00  0.9520  5.7030  2.84  10.89  10.00  28.37  36.88  108.91  620,428.47 
6065+100.00  0.0000  23.4310  0.95  29.13  10.00  9.52  12.38  291.34  620,149.51 
6065+120.00  0.0000  28.5450  0.00  51.98  10.00  0.00  0.00  519.76  619,629.75 
6065+140.00  0.0000  32.1400  0.00  60.69  10.00  0.00  0.00  606.85  619,022.90 
6065+160.00  0.0000  28.9440  0.00  61.08  10.00  0.00  0.00  610.84  618,412.06 
6065+180.00  0.5030  8.9090  0.50  37.85  10.00  5.03  6.54  378.53  618,040.07 
6065+200.00  0.0000  14.9290  0.50  23.84  10.00  5.03  6.54  238.38  617,808.22 
6065+220.00  0.0000  19.7190  0.00  34.65  10.00  0.00  0.00  346.48  617,461.74 
6065+240.00  0.9040  5.2060  0.90  24.93  10.00  9.04  11.75  249.25  617,224.25 
6065+260.00  0.3670  4.4180  1.27  9.62  10.00  12.71  16.52  96.24  617,144.53 
6065+280.00  0.0000  28.2380  0.37  32.66  10.00  3.67  4.77  326.56  616,822.74 
6065+300.00  0.0000  33.3930  0.00  61.63  10.00  0.00  0.00  616.31  616,206.43 
6065+320.00  0.0000  32.2610  0.00  65.65  10.00  0.00  0.00  656.54  615,549.89 
6065+340.00  0.0000  36.4250  0.00  68.69  10.00  0.00  0.00  686.86  614,863.03 
6065+360.00  0.0000  16.3120  0.00  52.74  10.00  0.00  0.00  527.37  614,335.66 
6065+380.00  0.0000  17.6760  0.00  33.99  10.00  0.00  0.00  339.88  613,995.78 
6065+400.00  0.0000  18.8000  0.00  36.48  10.00  0.00  0.00  364.76  613,631.02 
6065+420.00  0.6050  12.3820  0.61  31.18  10.00  6.05  7.87  311.82  613,327.07 
6065+440.00  1.7910  4.7650  2.40  17.15  10.00  23.96  31.15  171.47  613,186.74 
6065+460.00  0.0000  10.3460  1.79  15.11  10.00  17.91  23.28  151.11  613,058.92 
6065+480.00  0.0000  15.6210  0.00  25.97  10.00  0.00  0.00  259.67  612,799.25 
6065+500.00  0.0000  16.1080  0.00  31.73  10.00  0.00  0.00  317.29  612,481.96 
6065+520.00  0.0000  20.2710  0.00  36.38  10.00  0.00  0.00  363.79  612,118.17 
6065+540.00  0.0000  19.5940  0.00  39.87  10.00  0.00  0.00  398.65  611,719.52 
6065+560.00  0.0000  17.8510  0.00  37.45  10.00  0.00  0.00  374.45  611,345.07 
6065+560.00  0.0000  18.9430  0.00  36.79  0.00  0.00  0.00  0.00  611,345.07 
6065+580.00  0.0000  9.4700  0.00  28.41  10.00  0.00  0.00  284.13  611,060.94 
6065+600.00  1.0140  15.0740  1.01  24.54  10.00  10.14  13.18  245.44  610,828.68 

305 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6065+620.00  0.0000  15.7070  1.01  30.78  10.00  10.14  13.18  307.81  610,534.05 
6065+640.00  0.4280  11.3500  0.43  27.06  10.00  4.28  5.56  270.57  610,269.04 
6065+660.00  1.0290  6.5750  1.46  17.93  10.00  14.57  18.94  179.25  610,108.74 
6065+680.00  0.0000  19.3910  1.03  25.97  10.00  10.29  13.38  259.66  609,862.45 
6065+700.00  0.0000  12.6040  0.00  32.00  10.00  0.00  0.00  319.95  609,542.50 
6065+710.00  0.7670  7.9500  0.77  20.55  5.00  3.84  4.99  102.77  609,444.72 
6065+710.00  0.8000  7.5870  1.57  15.54  0.00  0.00  0.00  0.00  609,444.72 
6065+720.00  0.3550  12.9880  1.16  20.58  5.00  5.78  7.51  102.88  609,349.35 
6065+740.00  0.0000  22.4420  0.36  35.43  10.00  3.55  4.62  354.30  608,999.67 
6065+760.00  0.0000  23.4220  0.00  45.86  10.00  0.00  0.00  458.64  608,541.03 
6065+780.00  0.0000  21.9600  0.00  45.38  10.00  0.00  0.00  453.82  608,087.21 
6065+800.00  0.0000  24.0950  0.00  46.06  10.00  0.00  0.00  460.55  607,626.66 
6065+820.00  0.0000  25.1550  0.00  49.25  10.00  0.00  0.00  492.50  607,134.16 
6065+840.00  0.0000  22.1470  0.00  47.30  10.00  0.00  0.00  473.02  606,661.14 
6065+860.00  0.7460  7.6660  0.75  29.81  10.00  7.46  9.70  298.13  606,372.70 
6065+880.00  8.4700  0.1650  9.22  7.83  10.00  92.16  119.81  78.31  606,414.20 
6065+900.00  2.5990  1.2240  11.07  1.39  10.00  110.69  143.90  13.89  606,544.21 
6065+920.00  0.0000  13.4070  2.60  14.63  10.00  25.99  33.79  146.31  606,431.69 
6065+940.00  0.0000  19.8320  0.00  33.24  10.00  0.00  0.00  332.39  606,099.30 
6065+960.00  0.0000  28.5050  0.00  48.34  10.00  0.00  0.00  483.37  605,615.93 
6065+980.00  0.0000  27.7670  0.00  56.27  10.00  0.00  0.00  562.72  605,053.21 
6066+000.00  0.0000  20.1680  0.00  47.94  10.00  0.00  0.00  479.35  604,573.86 
6066+020.00  0.0000  19.1670  0.00  39.34  10.00  0.00  0.00  393.35  604,180.51 
6066+040.00  0.0000  13.0850  0.00  32.25  10.00  0.00  0.00  322.52  603,857.99 
6066+060.00  1.1150  9.5490  1.12  22.63  10.00  11.15  14.50  226.34  603,646.14 
6066+080.00  0.9870  10.7200  2.10  20.27  10.00  21.02  27.33  202.69  603,470.78 
6066+100.00  0.6140  6.0870  1.60  16.81  10.00  16.01  20.81  168.07  603,323.52 
6066+120.00  0.0000  6.4710  0.61  12.56  10.00  6.14  7.98  125.58  603,205.92 
6066+140.00  0.5880  9.3150  0.59  15.79  10.00  5.88  7.64  157.86  603,055.71 
6066+160.00  0.0000  18.5230  0.59  27.84  10.00  5.88  7.64  278.38  602,784.97 
6066+180.00  0.0000  21.8640  0.00  40.39  10.00  0.00  0.00  403.87  602,381.10 
6066+200.00  0.0000  21.6190  0.00  43.48  10.00  0.00  0.00  434.83  601,946.27 
6066+220.00  0.0000  24.5560  0.00  46.18  10.00  0.00  0.00  461.75  601,484.52 
6066+240.00  0.0000  20.0910  0.00  44.65  10.00  0.00  0.00  446.47  601,038.05 
6066+260.00  0.0000  9.3270  0.00  29.42  10.00  0.00  0.00  294.18  600,743.87 
6066+280.00  0.0000  28.4600  0.00  37.79  10.00  0.00  0.00  377.87  600,366.00 
6066+300.00  0.0000  27.6810  0.00  56.14  10.00  0.00  0.00  561.41  599,804.59 
6066+320.00  0.0000  28.9700  0.00  56.65  10.00  0.00  0.00  566.51  599,238.08 
6066+340.00  0.0000  29.6830  0.00  58.65  10.00  0.00  0.00  586.53  598,651.55 
6066+360.00  0.0000  20.7020  0.00  50.39  10.00  0.00  0.00  503.85  598,147.70 
6066+380.00  0.0000  20.3440  0.00  41.05  10.00  0.00  0.00  410.46  597,737.24 
6066+400.00  0.0000  30.4640  0.00  50.81  10.00  0.00  0.00  508.08  597,229.16 
6066+420.00  0.0000  31.8730  0.00  62.34  10.00  0.00  0.00  623.37  596,605.79 
6066+440.00  0.0000  30.1600  0.00  62.03  10.00  0.00  0.00  620.33  595,985.46 
6066+460.00  0.4570  11.2860  0.46  41.45  10.00  4.57  5.94  414.46  595,576.94 

306 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  Areas  a1+a2  Semi‐  Volumen  Abundamiento Volumen  Ordenada 


Cadenamiento 
Corte  Relleno  Corte  Relleno  distancia  Corte  30%  Relleno  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000  

6066+480.00  0.0000  18.0850  0.46  29.37  10.00  4.57  5.94  293.71  595,289.17 
6066+500.00  5.0350  0.7050  5.04  18.79  10.00  50.35  65.46  187.90  595,166.73 
6066+520.00  6.4750  4.1300  11.51  4.84  10.00  115.10  149.63  48.35  595,268.01 
6066+540.00  1.1940  13.9270  7.67  18.06  10.00  76.69  99.70  180.57  595,187.13 
6066+560.00  0.0000  22.8670  1.19  36.79  10.00  11.94  15.52  367.94  594,834.72 
6066+580.00  0.0000  11.9830  0.00  34.85  10.00  0.00  0.00  348.50  594,486.22 
6066+600.00  0.0000  21.8620  0.00  33.85  10.00  0.00  0.00  338.45  594,147.77 
6066+620.00  0.0000  29.2380  0.00  51.10  10.00  0.00  0.00  511.00  593,636.77 
6066+640.00  0.0000  28.8180  0.00  58.06  10.00  0.00  0.00  580.56  593,056.21 
6066+660.00  0.0000  25.9040  0.00  54.72  10.00  0.00  0.00  547.22  592,508.99 
6066+680.00  0.0000  30.2870  0.00  56.19  10.00  0.00  0.00  561.91  591,947.08 
6066+700.00  0.0000  21.2020  0.00  51.49  10.00  0.00  0.00  514.89  591,432.19 
6066+720.00  0.0000  27.8460  0.00  49.05  10.00  0.00  0.00  490.48  590,941.71 
6066+740.00  0.0000  18.6100  0.00  46.46  10.00  0.00  0.00  464.56  590,477.15 
6066+760.00  0.0000  16.3710  0.00  34.98  10.00  0.00  0.00  349.81  590,127.34 
6066+780.00  0.0000  13.5400  0.00  29.91  10.00  0.00  0.00  299.11  589,828.23 
6066+800.00  1.7940  8.8680  1.79  22.41  10.00  17.94  23.32  224.08  589,627.47 
6066+820.00  0.0000  17.0120  1.79  25.88  10.00  17.94  23.32  258.80  589,391.99 
6066+840.00  1.3950  1.3350  1.40  18.35  10.00  13.95  18.14  183.47  589,226.65 
6066+860.00  0.0000  18.6830  1.40  20.02  10.00  13.95  18.14  200.18  589,044.61 
6066+880.00  0.0000  38.2600  0.00  56.94  10.00  0.00  0.00  569.43  588,475.18 
6066+900.00  0.0000  29.8680  0.00  68.13  10.00  0.00  0.00  681.28  587,793.90 
6066+920.00  0.0000  32.6280  0.00  62.50  10.00  0.00  0.00  624.96  587,168.94 
6066+940.00  0.0000  22.5450  0.00  55.17  10.00  0.00  0.00  551.73  586,617.21 
6066+960.00  0.0000  32.9210  0.00  55.47  10.00  0.00  0.00  554.66  586,062.55 
6066+980.00  0.0000  5.8170  0.00  38.74  10.00  0.00  0.00  387.38  585,675.17 
6067+000.00  0.0000  27.0200  0.00  32.84  10.00  0.00  0.00  328.37  585,346.80 
 

6.1.2. Cálculo de acarreos para subrasante 
A continuación, se presentan los cálculos en las siguientes tablas del cálculo del acarreo del material 
para la construcción de la capa de subrasante. 

TABLA 29 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO [ADMINISTRADOR] 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5000+000.00  4.16  4.16        1,300,000.00 


5000+020.00  4.16  8.32  10.00  83.22  1,299,916.78 
5000+040.00  4.16  8.32  10.00  83.22  1,299,833.56 
5000+060.00  4.16  8.32  10.00  83.22  1,299,750.34 

307 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5000+080.00  4.16  8.32  10.00  83.22  1,299,667.12 


5000+100.00  4.16  8.32  10.00  83.22  1,299,583.90 
5000+120.00  4.16  8.32  10.00  83.22  1,299,500.68 
5000+140.00  4.16  8.32  10.00  83.22  1,299,417.46 
5000+160.00  4.16  8.32  10.00  83.22  1,299,334.24 
5000+180.00  4.16  8.32  10.00  83.22  1,299,251.02 
5000+200.00  4.16  8.32  10.00  83.22  1,299,167.80 
5000+220.00  4.16  8.32  10.00  83.22  1,299,084.58 
5000+240.00  4.16  8.32  10.00  83.22  1,299,001.36 
5000+260.00  4.16  8.32  10.00  83.22  1,298,918.14 
5000+280.00  4.16  8.32  10.00  83.22  1,298,834.92 
5000+300.00  4.16  8.32  10.00  83.22  1,298,751.70 
5000+320.00  4.16  8.32  10.00  83.22  1,298,668.48 
5000+340.00  4.16  8.32  10.00  83.22  1,298,585.26 
5000+360.00  4.16  8.32  10.00  83.22  1,298,502.04 
5000+380.00  4.16  8.32  10.00  83.22  1,298,418.82 
5000+400.00  4.16  8.32  10.00  83.22  1,298,335.60 
5000+420.00  4.16  8.32  10.00  83.22  1,298,252.38 
5000+440.00  4.16  8.32  10.00  83.22  1,298,169.16 
5000+440.00  4.16  8.32  0.00  0.00  1,298,169.16 
5000+460.00  4.16  8.32  10.00  83.22  1,298,085.94 
5000+480.00  4.16  8.32  10.00  83.22  1,298,002.72 
5000+500.00  4.16  8.32  10.00  83.22  1,297,919.50 
5000+520.00  4.16  8.32  10.00  83.22  1,297,836.28 
5000+540.00  4.16  8.32  10.00  83.22  1,297,753.06 
5000+560.00  4.16  8.32  10.00  83.22  1,297,669.84 
5000+580.00  4.16  8.32  10.00  83.22  1,297,586.62 
5000+600.00  4.16  8.32  10.00  83.22  1,297,503.40 
5000+620.00  4.16  8.32  10.00  83.22  1,297,420.18 
5000+640.00  4.16  8.32  10.00  83.22  1,297,336.96 
5000+660.00  4.16  8.32  10.00  83.22  1,297,253.74 
5000+680.00  4.16  8.32  10.00  83.22  1,297,170.52 
5000+700.00  4.16  8.32  10.00  83.22  1,297,087.30 
5000+720.00  4.16  8.32  10.00  83.22  1,297,004.08 
5000+740.00  4.16  8.32  10.00  83.22  1,296,920.86 
5000+760.00  4.16  8.32  10.00  83.22  1,296,837.64 
5000+780.00  4.16  8.32  10.00  83.22  1,296,754.42 
5000+800.00  4.16  8.32  10.00  83.22  1,296,671.20 
5000+820.00  4.16  8.32  10.00  83.22  1,296,587.98 
5000+840.00  4.16  8.32  10.00  83.22  1,296,504.76 
5000+860.00  4.16  8.32  10.00  83.22  1,296,421.54 
5000+880.00  4.16  8.32  10.00  83.22  1,296,338.32 
5000+900.00  4.16  8.32  10.00  83.22  1,296,255.10 
5000+920.00  4.16  8.32  10.00  83.22  1,296,171.88 
5000+940.00  4.16  8.32  10.00  83.22  1,296,088.66 

308 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5000+960.00  4.16  8.32  10.00  83.22  1,296,005.44 


5000+960.00  4.16  8.32  0.00  0.00  1,296,005.44 
5000+980.00  4.16  8.32  10.00  83.22  1,295,922.22 
5001+000.00  4.16  8.32  10.00  83.22  1,295,839.00 
5001+020.00  4.16  8.32  10.00  83.22  1,295,755.78 
5001+040.00  4.16  8.32  10.00  83.22  1,295,672.56 
5001+060.00  4.16  8.32  10.00  83.22  1,295,589.34 
5001+080.00  4.16  8.32  10.00  83.22  1,295,506.12 
5001+100.00  4.16  8.32  10.00  83.22  1,295,422.90 
5001+120.00  4.16  8.32  10.00  83.22  1,295,339.68 
5001+140.00  4.16  8.32  10.00  83.22  1,295,256.46 
5001+160.00  4.16  8.32  10.00  83.22  1,295,173.24 
5001+180.00  4.16  8.32  10.00  83.22  1,295,090.02 
5001+200.00  4.16  8.32  10.00  83.22  1,295,006.80 
5001+220.00  4.16  8.32  10.00  83.22  1,294,923.58 
5001+240.00  4.16  8.32  10.00  83.22  1,294,840.36 
5001+260.00  4.16  8.32  10.00  83.22  1,294,757.14 
5001+280.00  4.16  8.32  10.00  83.22  1,294,673.92 
5001+300.00  4.16  8.32  10.00  83.22  1,294,590.70 
5001+320.00  4.16  8.32  10.00  83.22  1,294,507.48 
5001+340.00  4.16  8.32  10.00  83.22  1,294,424.26 
5001+360.00  4.16  8.32  10.00  83.22  1,294,341.04 
5001+380.00  4.16  8.32  10.00  83.22  1,294,257.82 
5001+400.00  4.16  8.32  10.00  83.22  1,294,174.60 
5001+420.00  4.16  8.32  10.00  83.22  1,294,091.38 
5001+440.00  4.16  8.32  10.00  83.22  1,294,008.16 
5001+460.00  4.16  8.32  10.00  83.22  1,293,924.94 
5001+480.00  4.16  8.32  10.00  83.22  1,293,841.72 
5001+500.00  4.16  8.32  10.00  83.22  1,293,758.50 
5001+520.00  4.16  8.32  10.00  83.22  1,293,675.28 
5001+540.00  4.16  8.32  10.00  83.22  1,293,592.06 
5001+560.00  4.16  8.32  10.00  83.22  1,293,508.84 
5001+580.00  4.16  8.32  10.00  83.22  1,293,425.62 
5001+600.00  4.16  8.32  10.00  83.22  1,293,342.40 
5001+620.00  4.16  8.32  10.00  83.22  1,293,259.18 
5001+640.00  4.16  8.32  10.00  83.22  1,293,175.96 
5001+660.00  4.16  8.32  10.00  83.22  1,293,092.74 
5001+680.00  4.16  8.32  10.00  83.22  1,293,009.52 
5001+700.00  4.16  8.32  10.00  83.22  1,292,926.30 
5001+720.00  4.16  8.32  10.00  83.22  1,292,843.08 
5001+740.00  4.16  8.32  10.00  83.22  1,292,759.86 
5001+760.00  4.16  8.32  10.00  83.22  1,292,676.64 
5001+780.00  4.16  8.32  10.00  83.22  1,292,593.42 
5001+800.00  4.16  8.32  10.00  83.22  1,292,510.20 
5001+820.00  4.16  8.32  10.00  83.22  1,292,426.98 

309 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5001+840.00  4.16  8.32  10.00  83.22  1,292,343.76 


5001+860.00  4.16  8.32  10.00  83.22  1,292,260.54 
5001+880.00  4.16  8.32  10.00  83.22  1,292,177.32 
5001+900.00  4.16  8.32  10.00  83.22  1,292,094.10 
5001+920.00  4.16  8.32  10.00  83.22  1,292,010.88 
5001+940.00  4.16  8.32  10.00  83.22  1,291,927.66 
5001+960.00  4.16  8.32  10.00  83.22  1,291,844.44 
5001+980.00  4.16  8.32  10.00  83.22  1,291,761.22 
5002+000.00  4.16  8.32  10.00  83.22  1,291,678.00 
5002+020.00  4.16  8.32  10.00  83.22  1,291,594.78 
5002+040.00  4.16  8.32  10.00  83.22  1,291,511.56 
5002+060.00  4.16  8.32  10.00  83.22  1,291,428.34 
5002+080.00  4.16  8.32  10.00  83.22  1,291,345.12 
5002+100.00  4.16  8.32  10.00  83.22  1,291,261.90 
5002+120.00  4.16  8.32  10.00  83.22  1,291,178.68 
5002+140.00  4.16  8.32  10.00  83.22  1,291,095.46 
5002+160.00  4.16  8.32  10.00  83.22  1,291,012.24 
5002+180.00  4.16  8.32  10.00  83.22  1,290,929.02 
5002+200.00  4.16  8.32  10.00  83.22  1,290,845.80 
5002+220.00  4.16  8.32  10.00  83.22  1,290,762.58 
5002+240.00  4.16  8.32  10.00  83.22  1,290,679.36 
5002+260.00  4.16  8.32  10.00  83.22  1,290,596.14 
5002+280.00  4.16  8.32  10.00  83.22  1,290,512.92 
5002+300.00  4.16  8.32  10.00  83.22  1,290,429.70 
5002+320.00  4.16  8.32  10.00  83.22  1,290,346.48 
5002+340.00  4.16  8.32  10.00  83.22  1,290,263.26 
5002+360.00  4.16  8.32  10.00  83.22  1,290,180.04 
5002+380.00  4.16  8.32  10.00  83.22  1,290,096.82 
5002+400.00  4.16  8.32  10.00  83.22  1,290,013.60 
5002+420.00  4.16  8.32  10.00  83.22  1,289,930.38 
5002+440.00  4.16  8.32  10.00  83.22  1,289,847.16 
5002+460.00  4.16  8.32  10.00  83.22  1,289,763.94 
5002+480.00  4.16  8.32  10.00  83.22  1,289,680.72 
5002+500.00  4.16  8.32  10.00  83.22  1,289,597.50 
5002+520.00  4.16  8.32  10.00  83.22  1,289,514.28 
5002+540.00  4.16  8.32  10.00  83.22  1,289,431.06 
5002+560.00  4.16  8.32  10.00  83.22  1,289,347.84 
5002+580.00  4.16  8.32  10.00  83.22  1,289,264.62 
5002+600.00  4.16  8.32  10.00  83.22  1,289,181.40 
5002+620.00  4.16  8.32  10.00  83.22  1,289,098.18 
5002+640.00  4.16  8.32  10.00  83.22  1,289,014.96 
5002+660.00  4.16  8.32  10.00  83.22  1,288,931.74 
5002+680.00  4.16  8.32  10.00  83.22  1,288,848.52 
5002+700.00  4.16  8.32  10.00  83.22  1,288,765.30 
5002+720.00  4.16  8.32  10.00  83.22  1,288,682.08 

310 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5002+740.00  4.16  8.32  10.00  83.22  1,288,598.86 


5002+745.00  4.16  8.32  2.50  20.81  1,288,578.06 
5002+745.00  4.16  8.32  0.00  0.00  1,288,578.06 
5002+760.00  4.16  8.32  7.50  62.42  1,288,515.64 
5002+780.00  4.16  8.32  10.00  83.22  1,288,432.42 
5002+800.00  4.16  8.32  10.00  83.22  1,288,349.20 
5002+820.00  4.16  8.32  10.00  83.22  1,288,265.98 
5002+840.00  4.16  8.32  10.00  83.22  1,288,182.76 
5002+860.00  4.16  8.32  10.00  83.22  1,288,099.54 
5002+880.00  4.16  8.32  10.00  83.22  1,288,016.32 
5002+900.00  4.16  8.32  10.00  83.22  1,287,933.10 
5002+920.00  4.16  8.32  10.00  83.22  1,287,849.88 
5002+940.00  4.16  8.32  10.00  83.22  1,287,766.66 
5002+960.00  4.16  8.32  10.00  83.22  1,287,683.44 
5002+980.00  4.16  8.32  10.00  83.22  1,287,600.22 
5003+000.00  4.16  8.32  10.00  83.22  1,287,517.00 
5003+020.00  4.16  8.32  10.00  83.22  1,287,433.78 
5003+040.00  4.16  8.32  10.00  83.22  1,287,350.56 
5003+060.00  4.16  8.32  10.00  83.22  1,287,267.34 
5003+080.00  4.16  8.32  10.00  83.22  1,287,184.12 
5003+100.00  4.16  8.32  10.00  83.22  1,287,100.90 
5003+120.00  4.16  8.32  10.00  83.22  1,287,017.68 
5003+140.00  4.16  8.32  10.00  83.22  1,286,934.46 
5003+160.00  4.16  8.32  10.00  83.22  1,286,851.24 
5003+180.00  4.16  8.32  10.00  83.22  1,286,768.02 
5003+200.00  4.16  8.32  10.00  83.22  1,286,684.80 
5003+220.00  4.16  8.32  10.00  83.22  1,286,601.58 
5003+240.00  4.16  8.32  10.00  83.22  1,286,518.36 
5003+260.00  4.16  8.32  10.00  83.22  1,286,435.14 
5003+280.00  4.16  8.32  10.00  83.22  1,286,351.92 
5003+300.00  4.16  8.32  10.00  83.22  1,286,268.70 
5003+320.00  4.16  8.32  10.00  83.22  1,286,185.48 
5003+340.00  4.16  8.32  10.00  83.22  1,286,102.26 
5003+360.00  4.16  8.32  10.00  83.22  1,286,019.04 
5003+380.00  4.16  8.32  10.00  83.22  1,285,935.82 
5003+400.00  4.16  8.32  10.00  83.22  1,285,852.60 
5003+420.00  4.16  8.32  10.00  83.22  1,285,769.38 
5003+440.00  4.16  8.32  10.00  83.22  1,285,686.16 
5003+460.00  4.16  8.32  10.00  83.22  1,285,602.94 
5003+480.00  4.16  8.32  10.00  83.22  1,285,519.72 
5003+490.00  4.16  8.32  5.00  41.61  1,285,478.11 
5003+490.00  4.16  8.32  0.00  0.00  1,285,478.11 
5003+500.00  4.16  8.32  5.00  41.61  1,285,436.50 
5003+520.00  4.16  8.32  10.00  83.22  1,285,353.28 
5003+540.00  4.16  8.32  10.00  83.22  1,285,270.06 

311 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5003+560.00  4.16  8.32  10.00  83.22  1,285,186.84 


5003+580.00  4.16  8.32  10.00  83.22  1,285,103.62 
5003+600.00  4.16  8.32  10.00  83.22  1,285,020.40 
5003+620.00  4.16  8.32  10.00  83.22  1,284,937.18 
5003+640.00  4.16  8.32  10.00  83.22  1,284,853.96 
5003+660.00  4.16  8.32  10.00  83.22  1,284,770.74 
5003+680.00  4.16  8.32  10.00  83.22  1,284,687.52 
5003+700.00  4.16  8.32  10.00  83.22  1,284,604.30 
5003+720.00  4.16  8.32  10.00  83.22  1,284,521.08 
5003+740.00  4.16  8.32  10.00  83.22  1,284,437.86 
5003+760.00  4.16  8.32  10.00  83.22  1,284,354.64 
5003+780.00  4.16  8.32  10.00  83.22  1,284,271.42 
5003+800.00  4.16  8.32  10.00  83.22  1,284,188.20 
5003+820.00  4.16  8.32  10.00  83.22  1,284,104.98 
5003+840.00  4.16  8.32  10.00  83.22  1,284,021.76 
5003+860.00  4.16  8.32  10.00  83.22  1,283,938.54 
5003+880.00  4.16  8.32  10.00  83.22  1,283,855.32 
5003+900.00  4.16  8.32  10.00  83.22  1,283,772.10 
5003+920.00  4.16  8.32  10.00  83.22  1,283,688.88 
5003+940.00  4.16  8.32  10.00  83.22  1,283,605.66 
5003+960.00  4.16  8.32  10.00  83.22  1,283,522.44 
5003+980.00  4.16  8.32  10.00  83.22  1,283,439.22 
5004+000.00  4.16  8.32  10.00  83.22  1,283,356.00 
5004+020.00  4.16  8.32  10.00  83.22  1,283,272.78 
5004+040.00  4.16  8.32  10.00  83.22  1,283,189.56 
5004+060.00  4.16  8.32  10.00  83.22  1,283,106.34 
5004+080.00  4.16  8.32  10.00  83.22  1,283,023.12 
5004+100.00  4.16  8.32  10.00  83.22  1,282,939.90 
5004+120.00  4.16  8.32  10.00  83.22  1,282,856.68 
5004+140.00  4.16  8.32  10.00  83.22  1,282,773.46 
5004+160.00  4.16  8.32  10.00  83.22  1,282,690.24 
5004+180.00  4.16  8.32  10.00  83.22  1,282,607.02 
5004+200.00  4.16  8.32  10.00  83.22  1,282,523.80 
5004+220.00  4.16  8.32  10.00  83.22  1,282,440.58 
5004+240.00  4.16  8.32  10.00  83.22  1,282,357.36 
5004+260.00  4.16  8.32  10.00  83.22  1,282,274.14 
5004+280.00  4.16  8.32  10.00  83.22  1,282,190.92 
5004+300.00  4.16  8.32  10.00  83.22  1,282,107.70 
5004+310.00  4.16  8.32  5.00  41.61  1,282,066.09 
5004+310.00  4.16  8.32  0.00  0.00  1,282,066.09 
5004+320.00  4.16  8.32  5.00  41.61  1,282,024.48 
5004+340.00  4.16  8.32  10.00  83.22  1,281,941.26 
5004+360.00  4.16  8.32  10.00  83.22  1,281,858.04 
5004+380.00  4.16  8.32  10.00  83.22  1,281,774.82 
5004+400.00  4.16  8.32  10.00  83.22  1,281,691.60 

312 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5004+420.00  4.16  8.32  10.00  83.22  1,281,608.38 


5004+440.00  4.16  8.32  10.00  83.22  1,281,525.16 
5004+460.00  4.16  8.32  10.00  83.22  1,281,441.94 
5004+480.00  4.16  8.32  10.00  83.22  1,281,358.72 
5004+490.00  4.16  8.32  5.00  41.61  1,281,317.11 
5004+490.00  4.16  8.32  0.00  0.00  1,281,317.11 
5004+500.00  4.16  8.32  5.00  41.61  1,281,275.50 
5004+520.00  4.16  8.32  10.00  83.22  1,281,192.28 
5004+540.00  4.16  8.32  10.00  83.22  1,281,109.06 
5004+560.00  4.16  8.32  10.00  83.22  1,281,025.84 
5004+580.00  4.16  8.32  10.00  83.22  1,280,942.62 
5004+600.00  4.16  8.32  10.00  83.22  1,280,859.40 
5004+620.00  4.16  8.32  10.00  83.22  1,280,776.18 
5004+640.00  4.16  8.32  10.00  83.22  1,280,692.96 
5004+660.00  4.16  8.32  10.00  83.22  1,280,609.74 
5004+680.00  4.16  8.32  10.00  83.22  1,280,526.52 
5004+700.00  4.16  8.32  10.00  83.22  1,280,443.30 
5004+720.00  4.16  8.32  10.00  83.22  1,280,360.08 
5004+740.00  4.16  8.32  10.00  83.22  1,280,276.86 
5004+760.00  4.16  8.32  10.00  83.22  1,280,193.64 
5004+780.00  4.16  8.32  10.00  83.22  1,280,110.42 
5004+800.00  4.16  8.32  10.00  83.22  1,280,027.20 
5004+800.00  4.16  8.32  0.00  0.00  1,280,027.20 
5004+820.00  4.16  8.32  10.00  83.22  1,279,943.98 
5004+840.00  4.16  8.32  10.00  83.22  1,279,860.76 
5004+860.00  4.16  8.32  10.00  83.22  1,279,777.54 
5004+880.00  4.16  8.32  10.00  83.22  1,279,694.32 
5004+900.00  4.16  8.32  10.00  83.22  1,279,611.10 
5004+920.00  4.16  8.32  10.00  83.22  1,279,527.88 
5004+940.00  4.16  8.32  10.00  83.22  1,279,444.66 
5004+960.00  4.16  8.32  10.00  83.22  1,279,361.44 
5004+980.00  4.16  8.32  10.00  83.22  1,279,278.22 
5004+980.00  4.16  8.32  0.00  0.00  1,279,278.22 
5005+000.00  4.16  8.32  10.00  83.22  1,279,195.00 
5005+020.00  4.16  8.32  10.00  83.22  1,279,111.78 
5005+040.00  4.16  8.32  10.00  83.22  1,279,028.56 
5005+060.00  4.16  8.32  10.00  83.22  1,278,945.34 
5005+080.00  4.16  8.32  10.00  83.22  1,278,862.12 
5005+100.00  4.16  8.32  10.00  83.22  1,278,778.90 
5005+120.00  4.16  8.32  10.00  83.22  1,278,695.68 
5005+140.00  4.16  8.32  10.00  83.22  1,278,612.46 
5005+160.00  4.16  8.32  10.00  83.22  1,278,529.24 
5005+180.00  4.16  8.32  10.00  83.22  1,278,446.02 
5005+200.00  4.16  8.32  10.00  83.22  1,278,362.80 
5005+220.00  4.16  8.32  10.00  83.22  1,278,279.58 

313 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5005+240.00  4.16  8.32  10.00  83.22  1,278,196.36 


5005+260.00  4.16  8.32  10.00  83.22  1,278,113.14 
5005+280.00  4.16  8.32  10.00  83.22  1,278,029.92 
5005+300.00  4.16  8.32  10.00  83.22  1,277,946.70 
5005+320.00  4.16  8.32  10.00  83.22  1,277,863.48 
5005+340.00  4.16  8.32  10.00  83.22  1,277,780.26 
5005+360.00  4.16  8.32  10.00  83.22  1,277,697.04 
5005+380.00  4.16  8.32  10.00  83.22  1,277,613.82 
5005+400.00  4.16  8.32  10.00  83.22  1,277,530.60 
5005+420.00  4.16  8.32  10.00  83.22  1,277,447.38 
5005+440.00  4.16  8.32  10.00  83.22  1,277,364.16 
5005+460.00  4.16  8.32  10.00  83.22  1,277,280.94 
5005+480.00  4.16  8.32  10.00  83.22  1,277,197.72 
5005+500.00  4.16  8.32  10.00  83.22  1,277,114.50 
5005+520.00  4.16  8.32  10.00  83.22  1,277,031.28 
5005+540.00  4.16  8.32  10.00  83.22  1,276,948.06 
5005+560.00  4.16  8.32  10.00  83.22  1,276,864.84 
5005+580.00  4.16  8.32  10.00  83.22  1,276,781.62 
5005+600.00  4.16  8.32  10.00  83.22  1,276,698.40 
5005+620.00  4.16  8.32  10.00  83.22  1,276,615.18 
5005+640.00  4.16  8.32  10.00  83.22  1,276,531.96 
5005+660.00  4.16  8.32  10.00  83.22  1,276,448.74 
5005+680.00  4.16  8.32  10.00  83.22  1,276,365.52 
5005+680.00  4.16  8.32  0.00  0.00  1,276,365.52 
5005+700.00  4.16  8.32  10.00  83.22  1,276,282.30 
5005+720.00  4.16  8.32  10.00  83.22  1,276,199.08 
5005+740.00  4.16  8.32  10.00  83.22  1,276,115.86 
5005+760.00  4.16  8.32  10.00  83.22  1,276,032.64 
5005+780.00  4.16  8.32  10.00  83.22  1,275,949.42 
5005+800.00  4.16  8.32  10.00  83.22  1,275,866.20 
5005+820.00  4.16  8.32  10.00  83.22  1,275,782.98 
5005+840.00  4.16  8.32  10.00  83.22  1,275,699.76 
5005+860.00  4.16  8.32  10.00  83.22  1,275,616.54 
5005+880.00  4.16  8.32  10.00  83.22  1,275,533.32 
5005+890.00  4.16  8.32  5.00  41.61  1,275,491.71 
5005+890.00  4.16  8.32  0.00  0.00  1,275,491.71 
5005+900.00  4.16  8.32  5.00  41.61  1,275,450.10 
5005+920.00  4.16  8.32  10.00  83.22  1,275,366.88 
5005+940.00  4.16  8.32  10.00  83.22  1,275,283.66 
5005+960.00  4.16  8.32  10.00  83.22  1,275,200.44 
5005+980.00  4.16  8.32  10.00  83.22  1,275,117.22 
5006+000.00  4.16  8.32  10.00  83.22  1,275,034.00 
5006+020.00  4.16  8.32  10.00  83.22  1,274,950.78 
5006+040.00  4.16  8.32  10.00  83.22  1,274,867.56 
5006+060.00  4.16  8.32  10.00  83.22  1,274,784.34 

314 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5006+080.00  4.16  8.32  10.00  83.22  1,274,701.12 


5006+100.00  4.16  8.32  10.00  83.22  1,274,617.90 
5006+120.00  4.16  8.32  10.00  83.22  1,274,534.68 
5006+140.00  4.16  8.32  10.00  83.22  1,274,451.46 
5006+160.00  4.16  8.32  10.00  83.22  1,274,368.24 
5006+180.00  4.16  8.32  10.00  83.22  1,274,285.02 
5006+200.00  4.16  8.32  10.00  83.22  1,274,201.80 
5006+220.00  4.16  8.32  10.00  83.22  1,274,118.58 
5006+240.00  4.16  8.32  10.00  83.22  1,274,035.36 
5006+260.00  4.16  8.32  10.00  83.22  1,273,952.14 
5006+280.00  4.16  8.32  10.00  83.22  1,273,868.92 
5006+300.00  4.16  8.32  10.00  83.22  1,273,785.70 
5006+310.00  4.16  8.32  5.00  41.61  1,273,744.09 
5006+310.00  4.16  8.32  0.00  0.00  1,273,744.09 
5006+320.00  4.16  8.32  5.00  41.61  1,273,702.48 
5006+340.00  4.16  8.32  10.00  83.22  1,273,619.26 
5006+360.00  4.16  8.32  10.00  83.22  1,273,536.04 
5006+380.00  4.16  8.32  10.00  83.22  1,273,452.82 
5006+400.00  4.16  8.32  10.00  83.22  1,273,369.60 
5006+420.00  4.16  8.32  10.00  83.22  1,273,286.38 
5006+440.00  4.16  8.32  10.00  83.22  1,273,203.16 
5006+460.00  4.16  8.32  10.00  83.22  1,273,119.94 
5006+480.00  4.16  8.32  10.00  83.22  1,273,036.72 
5006+500.00  4.16  8.32  10.00  83.22  1,272,953.50 
5006+520.00  4.16  8.32  10.00  83.22  1,272,870.28 
5006+540.00  4.16  8.32  10.00  83.22  1,272,787.06 
5006+560.00  4.16  8.32  10.00  83.22  1,272,703.84 
5006+580.00  4.16  8.32  10.00  83.22  1,272,620.62 
5006+600.00  4.16  8.32  10.00  83.22  1,272,537.40 
5006+620.00  4.16  8.32  10.00  83.22  1,272,454.18 
5006+640.00  4.16  8.32  10.00  83.22  1,272,370.96 
5006+660.00  4.16  8.32  10.00  83.22  1,272,287.74 
5006+680.00  4.16  8.32  10.00  83.22  1,272,204.52 
5006+700.00  4.16  8.32  10.00  83.22  1,272,121.30 
5006+720.00  4.16  8.32  10.00  83.22  1,272,038.08 
5006+740.00  4.16  8.32  10.00  83.22  1,271,954.86 
5006+760.00  4.16  8.32  10.00  83.22  1,271,871.64 
5006+780.00  4.16  8.32  10.00  83.22  1,271,788.42 
5006+790.00  4.16  8.32  5.00  41.61  1,271,746.81 
5006+800.00  4.25  8.42  5.00  42.08  1,271,704.74 
5006+810.00  4.37  8.62  5.00  43.12  1,271,661.62 
5006+820.00  4.39  8.76  5.00  43.78  1,271,617.85 
5006+830.00  4.44  8.82  5.00  44.11  1,271,573.74 
5006+840.00  4.52  8.96  5.00  44.79  1,271,528.95 
5006+850.00  4.64  9.16  5.00  45.80  1,271,483.15 

315 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5006+860.00  4.79  9.43  5.00  47.16  1,271,436.00 


5006+870.00  4.98  9.77  5.00  48.85  1,271,387.15 
5006+880.00  5.18  10.16  5.00  50.80  1,271,336.35 
5006+890.00  5.38  10.57  5.00  52.83  1,271,283.53 
5006+900.00  5.59  10.97  5.00  54.86  1,271,228.67 
5006+910.00  5.79  11.38  5.00  56.89  1,271,171.79 
5006+920.00  5.98  11.77  5.00  58.84  1,271,112.95 
5006+930.00  6.13  12.11  5.00  60.53  1,271,052.42 
5006+940.00  6.25  12.38  5.00  61.88  1,270,990.54 
5006+950.00  6.33  12.58  5.00  62.90  1,270,927.65 
5006+960.00  6.38  12.72  5.00  63.58  1,270,864.07 
5006+970.00  6.40  12.78  5.00  63.91  1,270,800.16 
5006+980.00  6.40  12.80  5.00  63.99  1,270,736.17 
5007+000.00  6.40  12.80  10.00  127.98  1,270,608.19 
5007+020.00  6.40  12.80  10.00  127.98  1,270,480.21 
5007+040.00  6.40  12.80  10.00  127.98  1,270,352.23 
5007+060.00  6.40  12.80  10.00  127.98  1,270,224.25 
5007+080.00  6.40  12.80  10.00  127.98  1,270,096.27 
5007+100.00  6.40  12.80  10.00  127.98  1,269,968.29 
5007+120.00  6.40  12.80  10.00  127.98  1,269,840.31 
5007+140.00  6.40  12.80  10.00  127.98  1,269,712.33 
5007+160.00  6.40  12.80  10.00  127.98  1,269,584.35 
5007+180.00  6.40  12.80  10.00  127.98  1,269,456.37 
5007+180.00  6.40  12.80  0.00  0.00  1,269,456.37 
5007+200.00  6.40  12.80  10.00  127.98  1,269,328.39 
5007+220.00  6.40  12.80  10.00  127.98  1,269,200.41 
5007+240.00  6.40  12.80  10.00  127.98  1,269,072.43 
5007+260.00  6.40  12.80  10.00  127.98  1,268,944.45 
5007+280.00  6.40  12.80  10.00  127.98  1,268,816.47 
5007+300.00  6.40  12.80  10.00  127.98  1,268,688.49 
5007+320.00  6.40  12.80  10.00  127.98  1,268,560.51 
5007+340.00  6.40  12.80  10.00  127.98  1,268,432.53 
5007+360.00  6.40  12.80  10.00  127.98  1,268,304.55 
5007+360.00  6.40  12.80  0.00  0.00  1,268,304.55 
5007+380.00  6.40  12.80  10.00  127.98  1,268,176.57 
5007+400.00  6.40  12.80  10.00  127.98  1,268,048.59 
5007+420.00  6.40  12.80  10.00  127.98  1,267,920.61 
5007+440.00  6.40  12.80  10.00  127.98  1,267,792.63 
5007+460.00  6.40  12.80  10.00  127.98  1,267,664.65 
5007+480.00  6.40  12.80  10.00  127.98  1,267,536.67 
5007+500.00  6.40  12.80  10.00  127.98  1,267,408.69 
5007+520.00  6.40  12.80  10.00  127.98  1,267,280.71 
5007+540.00  6.40  12.80  10.00  127.98  1,267,152.73 
5007+560.00  6.40  12.80  10.00  127.98  1,267,024.75 
5007+580.00  6.40  12.80  10.00  127.98  1,266,896.77 

316 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5007+600.00  6.40  12.80  10.00  127.98  1,266,768.79 


5007+620.00  6.40  12.80  10.00  127.98  1,266,640.81 
5007+640.00  6.40  12.80  10.00  127.98  1,266,512.83 
5007+660.00  6.40  12.80  10.00  127.98  1,266,384.85 
5007+680.00  6.40  12.80  10.00  127.98  1,266,256.87 
5007+700.00  6.40  12.80  10.00  127.98  1,266,128.89 
5007+720.00  6.40  12.80  10.00  127.98  1,266,000.91 
5007+740.00  6.40  12.80  10.00  127.98  1,265,872.93 
5007+760.00  6.40  12.80  10.00  127.98  1,265,744.95 
5007+780.00  6.40  12.80  10.00  127.98  1,265,616.97 
5007+800.00  6.40  12.80  10.00  127.98  1,265,488.99 
5007+820.00  6.40  12.80  10.00  127.98  1,265,361.01 
5007+840.00  6.40  12.80  10.00  127.98  1,265,233.03 
5007+860.00  6.40  12.80  10.00  127.98  1,265,105.05 
5007+880.00  6.40  12.80  10.00  127.98  1,264,977.07 
5007+900.00  6.40  12.80  10.00  127.98  1,264,849.09 
5007+920.00  6.40  12.80  10.00  127.98  1,264,721.11 
5007+940.00  6.40  12.80  10.00  127.98  1,264,593.13 
5007+960.00  6.40  12.80  10.00  127.98  1,264,465.15 
5007+980.00  6.40  12.80  10.00  127.98  1,264,337.17 
5008+000.00  6.40  12.80  10.00  127.98  1,264,209.19 
5008+020.00  6.40  12.80  10.00  127.98  1,264,081.21 
5008+040.00  6.40  12.80  10.00  127.98  1,263,953.23 
5008+060.00  6.40  12.80  10.00  127.98  1,263,825.25 
5008+080.00  6.40  12.80  10.00  127.98  1,263,697.27 
5008+100.00  6.40  12.80  10.00  127.98  1,263,569.29 
5008+120.00  6.40  12.80  10.00  127.98  1,263,441.31 
5008+140.00  6.40  12.80  10.00  127.98  1,263,313.33 
5008+155.00  6.40  12.80  7.50  95.99  1,263,217.35 
5008+155.00  6.40  12.80  0.00  0.00  1,263,217.35 
5008+160.00  6.40  12.80  2.50  32.00  1,263,185.35 
5008+180.00  6.40  12.80  10.00  127.98  1,263,057.37 
5008+200.00  6.40  12.80  10.00  127.98  1,262,929.39 
5008+220.00  6.40  12.80  10.00  127.98  1,262,801.41 
5008+240.00  6.40  12.80  10.00  127.98  1,262,673.43 
5008+260.00  6.40  12.80  10.00  127.98  1,262,545.45 
5008+280.00  6.40  12.80  10.00  127.98  1,262,417.47 
5008+300.00  6.40  12.80  10.00  127.98  1,262,289.49 
5008+320.00  6.40  12.80  10.00  127.98  1,262,161.51 
5008+340.00  6.40  12.80  10.00  127.98  1,262,033.53 
5008+360.00  6.40  12.80  10.00  127.98  1,261,905.55 
5008+380.00  6.40  12.80  10.00  127.98  1,261,777.57 
5008+380.00  6.40  12.80  0.00  0.00  1,261,777.57 
5008+400.00  6.40  12.80  10.00  127.98  1,261,649.59 
5008+420.00  6.40  12.80  10.00  127.98  1,261,521.61 

317 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5008+440.00  6.40  12.80  10.00  127.98  1,261,393.63 


5008+460.00  6.40  12.80  10.00  127.98  1,261,265.65 
5008+470.00  6.40  12.80  5.00  63.99  1,261,201.66 
5008+480.00  6.38  12.78  5.00  63.91  1,261,137.75 
5008+490.00  6.33  12.72  5.00  63.58  1,261,074.18 
5008+500.00  6.25  12.58  5.00  62.90  1,261,011.28 
5008+510.00  6.13  12.38  5.00  61.88  1,260,949.41 
5008+520.00  5.98  12.10  5.00  60.52  1,260,888.89 
5008+530.00  5.79  11.77  5.00  58.83  1,260,830.06 
5008+540.00  5.59  11.38  5.00  56.89  1,260,773.17 
5008+550.00  5.38  10.97  5.00  54.86  1,260,718.32 
5008+560.00  5.18  10.57  5.00  52.83  1,260,665.49 
5008+570.00  4.98  10.16  5.00  50.80  1,260,614.70 
5008+580.00  4.79  9.77  5.00  48.85  1,260,565.85 
5008+590.00  4.64  9.43  5.00  47.16  1,260,518.69 
5008+600.00  4.52  9.16  5.00  45.80  1,260,472.89 
5008+610.00  4.44  8.96  5.00  44.79  1,260,428.11 
5008+620.00  4.39  8.82  5.00  44.11  1,260,384.00 
5008+629.97  4.37  8.75  4.98  43.64  1,260,340.36 
5008+629.97  4.37  8.74  0.00  0.00  1,260,340.36 
5008+640.00  4.25  8.62  5.01  43.24  1,260,297.12 
5008+649.97  4.16  8.42  4.98  41.95  1,260,255.17 
5008+649.97  4.16  8.32  0.00  0.00  1,260,255.16 
5008+660.00  4.16  8.32  5.01  41.73  1,260,213.43 
5008+680.00  4.16  8.32  10.00  83.22  1,260,130.21 
5008+700.00  4.16  8.32  10.00  83.22  1,260,046.99 
5008+720.00  4.16  8.32  10.00  83.22  1,259,963.77 
5008+740.00  4.16  8.32  10.00  83.22  1,259,880.55 
5008+760.00  4.16  8.32  10.00  83.22  1,259,797.33 
5008+780.00  4.16  8.32  10.00  83.22  1,259,714.11 
5008+800.00  4.16  8.32  10.00  83.22  1,259,630.89 
5008+820.00  4.16  8.32  10.00  83.22  1,259,547.67 
5008+840.00  4.16  8.32  10.00  83.22  1,259,464.45 
5008+860.00  4.16  8.32  10.00  83.22  1,259,381.23 
5008+880.00  4.16  8.32  10.00  83.22  1,259,298.01 
5008+900.00  4.16  8.32  10.00  83.22  1,259,214.79 
5008+920.00  4.16  8.32  10.00  83.22  1,259,131.57 
5008+940.00  4.16  8.32  10.00  83.22  1,259,048.35 
5008+960.00  4.16  8.32  10.00  83.22  1,258,965.13 
5008+980.00  4.16  8.32  10.00  83.22  1,258,881.91 
5009+000.00  4.16  8.32  10.00  83.22  1,258,798.69 
5009+020.00  4.16  8.32  10.00  83.22  1,258,715.47 
5009+040.00  4.16  8.32  10.00  83.22  1,258,632.25 
5009+060.00  4.16  8.32  10.00  83.22  1,258,549.03 
5009+080.00  4.16  8.32  10.00  83.22  1,258,465.81 

318 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5009+090.00  4.16  8.32  5.00  41.61  1,258,424.20 


5009+090.00  4.16  8.32  0.00  0.00  1,258,424.20 
5009+100.00  4.16  8.32  5.00  41.61  1,258,382.59 
5009+120.00  4.16  8.32  10.00  83.22  1,258,299.37 
5009+130.00  4.16  8.32  5.00  41.61  1,258,257.76 
5009+140.00  4.16  8.32  5.00  41.61  1,258,216.15 
5009+160.00  4.16  8.32  10.00  83.22  1,258,132.93 
5009+180.00  4.16  8.32  10.00  83.22  1,258,049.71 
5009+200.00  4.16  8.32  10.00  83.22  1,257,966.49 
5009+200.00  4.16  8.32  0.00  0.00  1,257,966.49 
5009+220.00  4.16  8.32  10.00  83.22  1,257,883.27 
5009+240.00  4.16  8.32  10.00  83.22  1,257,800.05 
5009+260.00  4.16  8.32  10.00  83.22  1,257,716.83 
5009+280.00  4.16  8.32  10.00  83.22  1,257,633.61 
5009+300.00  4.16  8.32  10.00  83.22  1,257,550.39 
5009+320.00  4.16  8.32  10.00  83.22  1,257,467.17 
5009+340.00  4.16  8.32  10.00  83.22  1,257,383.95 
5009+360.00  4.16  8.32  10.00  83.22  1,257,300.73 
5009+380.00  4.16  8.32  10.00  83.22  1,257,217.51 
5009+400.00  4.16  8.32  10.00  83.22  1,257,134.29 
5009+420.00  4.16  8.32  10.00  83.22  1,257,051.07 
5009+440.00  4.16  8.32  10.00  83.22  1,256,967.85 
5009+460.00  4.16  8.32  10.00  83.22  1,256,884.63 
5009+480.00  4.16  8.32  10.00  83.22  1,256,801.41 
5009+500.00  4.16  8.32  10.00  83.22  1,256,718.19 
5009+520.00  4.16  8.32  10.00  83.22  1,256,634.97 
5009+540.00  4.16  8.32  10.00  83.22  1,256,551.75 
5009+560.00  4.16  8.32  10.00  83.22  1,256,468.53 
5009+580.00  4.16  8.32  10.00  83.22  1,256,385.31 
5009+587.89  4.16  8.32  3.94  32.81  1,256,352.50 
5009+600.00  4.16  8.32  6.06  50.41  1,256,302.09 
5009+620.00  4.16  8.32  10.00  83.22  1,256,218.87 
5009+640.00  4.16  8.32  10.00  83.22  1,256,135.65 
5009+660.00  4.16  8.32  10.00  83.22  1,256,052.43 
5009+680.00  4.16  8.32  10.00  83.22  1,255,969.21 
5009+700.00  4.16  8.32  10.00  83.22  1,255,885.99 
5009+717.89  4.16  8.32  8.94  74.42  1,255,811.57 
5009+720.00  4.16  8.32  1.06  8.80  1,255,802.77 
5009+740.00  4.16  8.32  10.00  83.22  1,255,719.55 
5009+760.00  4.16  8.32  10.00  83.22  1,255,636.33 
5009+780.00  4.16  8.32  10.00  83.22  1,255,553.11 
5009+800.00  4.16  8.32  10.00  83.22  1,255,469.89 
5009+817.42  4.16  8.32  8.71  72.47  1,255,397.42 
5009+820.00  4.16  8.32  1.29  10.75  1,255,386.67 
5009+840.00  4.16  8.32  10.00  83.22  1,255,303.45 

319 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5009+850.00  4.16  8.32  5.00  41.61  1,255,261.84 


5009+850.00  4.16  8.32  0.00  0.00  1,255,261.84 
5009+860.00  4.16  8.32  5.00  41.61  1,255,220.23 
5009+880.00  4.16  8.32  10.00  83.22  1,255,137.01 
5009+900.00  4.16  8.32  10.00  83.22  1,255,053.79 
5009+920.00  4.16  8.32  10.00  83.22  1,254,970.57 
5009+940.00  4.16  8.32  10.00  83.22  1,254,887.35 
5009+947.42  4.16  8.32  3.71  30.86  1,254,856.49 
5009+960.00  4.16  8.32  6.29  52.36  1,254,804.13 
5009+980.00  4.16  8.32  10.00  83.22  1,254,720.91 
5010+000.00  4.16  8.32  10.00  83.22  1,254,637.69 
5010+020.00  4.16  8.32  10.00  83.22  1,254,554.47 
5010+040.00  4.16  8.32  10.00  83.22  1,254,471.25 
5010+060.00  4.16  8.32  10.00  83.22  1,254,388.03 
5010+080.00  4.16  8.32  10.00  83.22  1,254,304.81 
5010+100.00  4.16  8.32  10.00  83.22  1,254,221.59 
5010+120.00  4.16  8.32  10.00  83.22  1,254,138.37 
5010+140.00  4.16  8.32  10.00  83.22  1,254,055.15 
5010+160.00  4.16  8.32  10.00  83.22  1,253,971.93 
5010+180.00  4.16  8.32  10.00  83.22  1,253,888.71 
5010+200.00  4.16  8.32  10.00  83.22  1,253,805.49 
5010+220.00  4.16  8.32  10.00  83.22  1,253,722.27 
5010+240.00  4.16  8.32  10.00  83.22  1,253,639.05 
5010+260.00  4.16  8.32  10.00  83.22  1,253,555.83 
5010+280.00  4.16  8.32  10.00  83.22  1,253,472.61 
5010+300.00  4.16  8.32  10.00  83.22  1,253,389.39 
5010+320.00  4.16  8.32  10.00  83.22  1,253,306.17 
5010+340.00  4.16  8.32  10.00  83.22  1,253,222.95 
5010+360.00  4.16  8.32  10.00  83.22  1,253,139.73 
5010+380.00  4.16  8.32  10.00  83.22  1,253,056.51 
5010+400.00  4.16  8.32  10.00  83.22  1,252,973.29 
5010+420.00  4.16  8.32  10.00  83.22  1,252,890.07 
5010+440.00  4.16  8.32  10.00  83.22  1,252,806.85 
5010+460.00  4.16  8.32  10.00  83.22  1,252,723.63 
5010+480.00  4.16  8.32  10.00  83.22  1,252,640.41 
5010+500.00  4.16  8.32  10.00  83.22  1,252,557.19 
5010+520.00  4.16  8.32  10.00  83.22  1,252,473.97 
5010+540.00  4.16  8.32  10.00  83.22  1,252,390.75 
5010+560.00  4.16  8.32  10.00  83.22  1,252,307.53 
5010+580.00  4.16  8.32  10.00  83.22  1,252,224.31 
5010+600.00  4.16  8.32  10.00  83.22  1,252,141.09 
5010+620.00  4.16  8.32  10.00  83.22  1,252,057.87 
5010+640.00  4.16  8.32  10.00  83.22  1,251,974.65 
5010+660.00  4.16  8.32  10.00  83.22  1,251,891.43 
5010+680.00  4.16  8.32  10.00  83.22  1,251,808.21 

320 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5010+700.00  4.16  8.32  10.00  83.22  1,251,724.99 


5010+720.00  4.16  8.32  10.00  83.22  1,251,641.77 
5010+740.00  4.16  8.32  10.00  83.22  1,251,558.55 
5010+760.00  4.16  8.32  10.00  83.22  1,251,475.33 
5010+780.00  4.16  8.32  10.00  83.22  1,251,392.11 
5010+800.00  4.16  8.32  10.00  83.22  1,251,308.89 
5010+820.00  4.16  8.32  10.00  83.22  1,251,225.67 
5010+840.00  4.16  8.32  10.00  83.22  1,251,142.45 
5010+860.00  4.16  8.32  10.00  83.22  1,251,059.23 
5010+880.00  4.16  8.32  10.00  83.22  1,250,976.01 
5010+900.00  4.16  8.32  10.00  83.22  1,250,892.79 
5010+920.00  4.16  8.32  10.00  83.22  1,250,809.57 
5010+940.00  4.16  8.32  10.00  83.22  1,250,726.35 
5010+960.00  4.16  8.32  10.00  83.22  1,250,643.13 
5010+980.00  4.16  8.32  10.00  83.22  1,250,559.91 
5011+000.00  4.16  8.32  10.00  83.22  1,250,476.69 
5011+020.00  4.16  8.32  10.00  83.22  1,250,393.47 
5011+040.00  4.16  8.32  10.00  83.22  1,250,310.25 
5011+060.00  4.16  8.32  10.00  83.22  1,250,227.03 
5011+080.00  4.16  8.32  10.00  83.22  1,250,143.81 
5011+100.00  4.16  8.32  10.00  83.22  1,250,060.59 
5011+120.00  4.16  8.32  10.00  83.22  1,249,977.37 
5011+140.00  4.16  8.32  10.00  83.22  1,249,894.15 
5011+160.00  4.16  8.32  10.00  83.22  1,249,810.93 
5011+180.00  4.16  8.32  10.00  83.22  1,249,727.71 
5011+200.00  4.16  8.32  10.00  83.22  1,249,644.49 
5011+220.00  4.16  8.32  10.00  83.22  1,249,561.27 
5011+240.00  4.16  8.32  10.00  83.22  1,249,478.05 
5011+260.00  4.16  8.32  10.00  83.22  1,249,394.83 
5011+280.00  4.16  8.32  10.00  83.22  1,249,311.61 
5011+300.00  4.16  8.32  10.00  83.22  1,249,228.39 
5011+320.00  4.16  8.32  10.00  83.22  1,249,145.17 
5011+340.00  4.16  8.32  10.00  83.22  1,249,061.95 
5011+360.00  4.16  8.32  10.00  83.22  1,248,978.73 
5011+380.00  4.16  8.32  10.00  83.22  1,248,895.51 
5011+400.00  4.16  8.32  10.00  83.22  1,248,812.29 
5011+420.00  4.16  8.32  10.00  83.22  1,248,729.07 
5011+420.00  4.16  8.32  0.00  0.00  1,248,729.07 
5011+440.00  4.16  8.32  10.00  83.22  1,248,645.85 
5011+460.00  4.16  8.32  10.00  83.22  1,248,562.63 
5011+480.00  4.16  8.32  10.00  83.22  1,248,479.41 
5011+500.00  4.16  8.32  10.00  83.22  1,248,396.19 
5011+520.00  4.16  8.32  10.00  83.22  1,248,312.97 
5011+540.00  4.16  8.32  10.00  83.22  1,248,229.75 
5011+560.00  4.16  8.32  10.00  83.22  1,248,146.53 

321 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5011+580.00  4.16  8.32  10.00  83.22  1,248,063.31 


5011+600.00  4.16  8.32  10.00  83.22  1,247,980.09 
5011+620.00  4.16  8.32  10.00  83.22  1,247,896.87 
5011+640.00  4.16  8.32  10.00  83.22  1,247,813.65 
5011+660.00  4.16  8.32  10.00  83.22  1,247,730.43 
5011+680.00  4.16  8.32  10.00  83.22  1,247,647.21 
5011+700.00  4.16  8.32  10.00  83.22  1,247,563.99 
5011+720.00  4.16  8.32  10.00  83.22  1,247,480.77 
5011+740.00  4.16  8.32  10.00  83.22  1,247,397.55 
5011+760.00  4.16  8.32  10.00  83.22  1,247,314.33 
5011+780.00  4.16  8.32  10.00  83.22  1,247,231.11 
5011+800.00  4.16  8.32  10.00  83.22  1,247,147.89 
5011+820.00  4.16  8.32  10.00  83.22  1,247,064.67 
5011+840.00  4.16  8.32  10.00  83.22  1,246,981.45 
5011+860.00  4.16  8.32  10.00  83.22  1,246,898.23 
5011+880.00  4.16  8.32  10.00  83.22  1,246,815.01 
5011+900.00  4.16  8.32  10.00  83.22  1,246,731.79 
5011+920.00  4.16  8.32  10.00  83.22  1,246,648.57 
5011+940.00  4.16  8.32  10.00  83.22  1,246,565.35 
5011+940.00  4.16  8.32  0.00  0.00  1,246,565.35 
5011+960.00  4.16  8.32  10.00  83.22  1,246,482.13 
5011+980.00  4.16  8.32  10.00  83.22  1,246,398.91 
5012+000.00  4.16  8.32  10.00  83.22  1,246,315.69 
5012+000.00  4.32  8.48  0.00  0.00  1,246,315.69 
5012+020.00  4.32  8.64  10.00  86.42  1,246,229.27 
5012+040.00  4.32  8.64  10.00  86.42  1,246,142.85 
5012+060.00  4.32  8.64  10.00  86.42  1,246,056.43 
5012+080.00  4.32  8.64  10.00  86.42  1,245,970.01 
5012+100.00  4.32  8.64  10.00  86.42  1,245,883.59 
5012+120.00  4.32  8.64  10.00  86.42  1,245,797.17 
5012+140.00  4.32  8.64  10.00  86.42  1,245,710.75 
5012+160.00  4.32  8.64  10.00  86.42  1,245,624.33 
5012+180.00  4.32  8.64  10.00  86.42  1,245,537.91 
5012+200.00  4.32  8.64  10.00  86.42  1,245,451.49 
5012+220.00  4.32  8.64  10.00  86.42  1,245,365.07 
5012+240.00  4.32  8.64  10.00  86.42  1,245,278.65 
5012+260.00  4.32  8.64  10.00  86.42  1,245,192.23 
5012+280.00  4.32  8.64  10.00  86.42  1,245,105.81 
5012+300.00  4.32  8.64  10.00  86.42  1,245,019.39 
5012+320.00  4.32  8.64  10.00  86.42  1,244,932.97 
5012+340.00  4.32  8.64  10.00  86.42  1,244,846.55 
5012+360.00  4.32  8.64  10.00  86.42  1,244,760.13 
5012+380.00  4.32  8.64  10.00  86.42  1,244,673.71 
5012+400.00  4.32  8.64  10.00  86.42  1,244,587.29 
5012+420.00  4.32  8.64  10.00  86.42  1,244,500.87 

322 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5012+420.00  4.32  8.64  0.00  0.00  1,244,500.87 


5012+440.00  4.32  8.64  10.00  86.42  1,244,414.45 
5012+460.00  4.32  8.64  10.00  86.42  1,244,328.03 
5012+480.00  4.32  8.64  10.00  86.42  1,244,241.61 
5012+500.00  4.32  8.64  10.00  86.42  1,244,155.19 
5012+520.00  4.32  8.64  10.00  86.42  1,244,068.77 
5012+540.00  4.32  8.64  10.00  86.42  1,243,982.35 
5012+560.00  4.32  8.64  10.00  86.42  1,243,895.93 
5012+580.00  4.32  8.64  10.00  86.42  1,243,809.51 
5012+600.00  4.32  8.64  10.00  86.42  1,243,723.09 
5012+600.00  4.32  8.64  0.00  0.00  1,243,723.09 
5012+620.00  4.32  8.64  10.00  86.42  1,243,636.67 
5012+640.00  4.32  8.64  10.00  86.42  1,243,550.25 
5012+660.00  4.32  8.64  10.00  86.42  1,243,463.83 
5012+680.00  4.32  8.64  10.00  86.42  1,243,377.41 
5012+700.00  4.32  8.64  10.00  86.42  1,243,290.99 
5012+720.00  4.32  8.64  10.00  86.42  1,243,204.57 
5012+740.00  4.32  8.64  10.00  86.42  1,243,118.15 
5012+760.00  4.32  8.64  10.00  86.42  1,243,031.73 
5012+780.00  4.32  8.64  10.00  86.42  1,242,945.31 
5012+800.00  4.32  8.64  10.00  86.42  1,242,858.89 
5012+820.00  4.32  8.64  10.00  86.42  1,242,772.47 
5012+840.00  4.32  8.64  10.00  86.42  1,242,686.05 
5012+860.00  4.32  8.64  10.00  86.42  1,242,599.63 
5012+880.00  4.32  8.64  10.00  86.42  1,242,513.21 
5012+900.00  4.32  8.64  10.00  86.42  1,242,426.79 
5012+920.00  4.32  8.64  10.00  86.42  1,242,340.37 
5012+940.00  4.32  8.64  10.00  86.42  1,242,253.95 
5012+960.00  4.32  8.64  10.00  86.42  1,242,167.53 
5012+980.00  4.32  8.64  10.00  86.42  1,242,081.11 
5013+000.00  4.32  8.64  10.00  86.42  1,241,994.69 
5013+020.00  4.32  8.64  10.00  86.42  1,241,908.27 
5013+040.00  4.32  8.64  10.00  86.42  1,241,821.85 
5013+060.00  4.32  8.64  10.00  86.42  1,241,735.43 
5013+080.00  4.32  8.64  10.00  86.42  1,241,649.01 
5013+100.00  4.32  8.64  10.00  86.42  1,241,562.59 
5013+120.00  4.32  8.64  10.00  86.42  1,241,476.17 
5013+140.00  4.32  8.64  10.00  86.42  1,241,389.75 
5013+160.00  4.32  8.64  10.00  86.42  1,241,303.33 
5013+180.00  4.32  8.64  10.00  86.42  1,241,216.91 
5013+200.00  4.32  8.64  10.00  86.42  1,241,130.49 
5013+220.00  4.32  8.64  10.00  86.42  1,241,044.07 
5013+235.00  4.32  8.64  7.50  64.82  1,240,979.26 
5013+235.00  4.32  8.64  0.00  0.00  1,240,979.26 
5013+240.00  4.32  8.64  2.50  21.61  1,240,957.65 

323 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5013+260.00  4.32  8.64  10.00  86.42  1,240,871.23 


5013+280.00  4.32  8.64  10.00  86.42  1,240,784.81 
5013+300.00  4.32  8.64  10.00  86.42  1,240,698.39 
5013+320.00  4.32  8.64  10.00  86.42  1,240,611.97 
5013+340.00  4.32  8.64  10.00  86.42  1,240,525.55 
5013+360.00  4.32  8.64  10.00  86.42  1,240,439.13 
5013+380.00  4.32  8.64  10.00  86.42  1,240,352.71 
5013+390.00  4.32  8.64  5.00  43.21  1,240,309.50 
5013+390.00  4.32  8.64  0.00  0.00  1,240,309.50 
5013+400.00  4.32  8.64  5.00  43.21  1,240,266.29 
5013+420.00  4.32  8.64  10.00  86.42  1,240,179.87 
5013+440.00  4.32  8.64  10.00  86.42  1,240,093.45 
5013+460.00  4.32  8.64  10.00  86.42  1,240,007.03 
5013+480.00  4.32  8.64  10.00  86.42  1,239,920.61 
5013+500.00  4.32  8.64  10.00  86.42  1,239,834.19 
5013+520.00  4.32  8.64  10.00  86.42  1,239,747.77 
5013+540.00  4.32  8.64  10.00  86.42  1,239,661.35 
5013+560.00  4.32  8.64  10.00  86.42  1,239,574.93 
5013+580.00  4.32  8.64  10.00  86.42  1,239,488.51 
5013+600.00  4.32  8.64  10.00  86.42  1,239,402.09 
5013+620.00  4.32  8.64  10.00  86.42  1,239,315.67 
5013+640.00  4.32  8.64  10.00  86.42  1,239,229.25 
5013+660.00  4.32  8.64  10.00  86.42  1,239,142.83 
5013+680.00  4.32  8.64  10.00  86.42  1,239,056.41 
5013+700.00  4.32  8.64  10.00  86.42  1,238,969.99 
5013+720.00  4.32  8.64  10.00  86.42  1,238,883.57 
5013+740.00  4.32  8.64  10.00  86.42  1,238,797.15 
5013+760.00  4.32  8.64  10.00  86.42  1,238,710.73 
5013+780.00  4.32  8.64  10.00  86.42  1,238,624.31 
5013+800.00  4.32  8.64  10.00  86.42  1,238,537.89 
5013+820.00  4.32  8.64  10.00  86.42  1,238,451.47 
5013+840.00  4.32  8.64  10.00  86.42  1,238,365.05 
5013+860.00  4.32  8.64  10.00  86.42  1,238,278.63 
5013+880.00  4.32  8.64  10.00  86.42  1,238,192.21 
5013+900.00  4.32  8.64  10.00  86.42  1,238,105.79 
5013+920.00  4.32  8.64  10.00  86.42  1,238,019.37 
5013+940.00  4.32  8.64  10.00  86.42  1,237,932.95 
5013+960.00  4.32  8.64  10.00  86.42  1,237,846.53 
5013+980.00  4.32  8.64  10.00  86.42  1,237,760.11 
5014+000.00  4.32  8.64  10.00  86.42  1,237,673.69 
5014+020.00  4.32  8.64  10.00  86.42  1,237,587.27 
5014+040.00  4.32  8.64  10.00  86.42  1,237,500.85 
5014+060.00  4.32  8.64  10.00  86.42  1,237,414.43 
5014+060.00  4.32  8.64  0.00  0.00  1,237,414.43 
5014+080.00  4.32  8.64  10.00  86.42  1,237,328.01 

324 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5014+100.00  4.32  8.64  10.00  86.42  1,237,241.59 


5014+120.00  4.32  8.64  10.00  86.42  1,237,155.17 
5014+140.00  4.32  8.64  10.00  86.42  1,237,068.75 
5014+160.00  4.32  8.64  10.00  86.42  1,236,982.33 
5014+180.00  4.32  8.64  10.00  86.42  1,236,895.91 
5014+200.00  4.32  8.64  10.00  86.42  1,236,809.49 
5014+220.00  4.32  8.64  10.00  86.42  1,236,723.07 
5014+240.00  4.32  8.64  10.00  86.42  1,236,636.65 
5014+260.00  4.32  8.64  10.00  86.42  1,236,550.23 
5014+280.00  4.32  8.64  10.00  86.42  1,236,463.81 
5014+300.00  4.32  8.64  10.00  86.42  1,236,377.39 
5014+320.00  4.32  8.64  10.00  86.42  1,236,290.97 
5014+340.00  4.32  8.64  10.00  86.42  1,236,204.55 
5014+360.00  4.32  8.64  10.00  86.42  1,236,118.13 
5014+380.00  4.32  8.64  10.00  86.42  1,236,031.71 
5014+400.00  4.32  8.64  10.00  86.42  1,235,945.29 
5014+420.00  4.32  8.64  10.00  86.42  1,235,858.87 
5014+440.00  4.32  8.64  10.00  86.42  1,235,772.45 
5014+460.00  4.32  8.64  10.00  86.42  1,235,686.03 
5014+480.00  4.32  8.64  10.00  86.42  1,235,599.61 
5014+500.00  4.32  8.64  10.00  86.42  1,235,513.19 
5014+520.00  4.32  8.64  10.00  86.42  1,235,426.77 
5014+540.00  4.32  8.64  10.00  86.42  1,235,340.35 
5014+560.00  4.32  8.64  10.00  86.42  1,235,253.93 
5014+580.00  4.32  8.64  10.00  86.42  1,235,167.51 
5014+600.00  4.32  8.64  10.00  86.42  1,235,081.09 
5014+620.00  4.32  8.64  10.00  86.42  1,234,994.67 
5014+640.00  4.32  8.64  10.00  86.42  1,234,908.25 
5014+660.00  4.32  8.64  10.00  86.42  1,234,821.83 
5014+680.00  4.32  8.64  10.00  86.42  1,234,735.41 
5014+700.00  4.32  8.64  10.00  86.42  1,234,648.99 
5014+720.00  4.32  8.64  10.00  86.42  1,234,562.57 
5014+740.00  4.32  8.64  10.00  86.42  1,234,476.15 
5014+760.00  4.32  8.64  10.00  86.42  1,234,389.73 
5014+780.00  4.32  8.64  10.00  86.42  1,234,303.31 
5014+800.00  4.32  8.64  10.00  86.42  1,234,216.89 
5014+820.00  4.32  8.64  10.00  86.42  1,234,130.47 
5014+840.00  4.32  8.64  10.00  86.42  1,234,044.05 
5014+860.00  4.32  8.64  10.00  86.42  1,233,957.63 
5014+880.00  4.32  8.64  10.00  86.42  1,233,871.21 
5014+900.00  4.32  8.64  10.00  86.42  1,233,784.79 
5014+920.00  4.32  8.64  10.00  86.42  1,233,698.37 
5014+940.00  4.32  8.64  10.00  86.42  1,233,611.95 
5014+960.00  4.32  8.64  10.00  86.42  1,233,525.53 
5014+980.00  4.32  8.64  10.00  86.42  1,233,439.11 

325 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5015+000.00  4.32  8.64  10.00  86.42  1,233,352.69 


5015+020.00  4.32  8.64  10.00  86.42  1,233,266.27 
5015+040.00  4.32  8.64  10.00  86.42  1,233,179.85 
5015+060.00  4.32  8.64  10.00  86.42  1,233,093.43 
5015+080.00  4.32  8.64  10.00  86.42  1,233,007.01 
5015+100.00  4.32  8.64  10.00  86.42  1,232,920.59 
5015+120.00  4.32  8.64  10.00  86.42  1,232,834.17 
5015+140.00  4.32  8.64  10.00  86.42  1,232,747.75 
5015+160.00  4.32  8.64  10.00  86.42  1,232,661.33 
5015+180.00  4.32  8.64  10.00  86.42  1,232,574.91 
5015+200.00  4.32  8.64  10.00  86.42  1,232,488.49 
5015+220.00  4.32  8.64  10.00  86.42  1,232,402.07 
5015+240.00  4.32  8.64  10.00  86.42  1,232,315.65 
5015+260.00  4.32  8.64  10.00  86.42  1,232,229.23 
5015+280.00  4.32  8.64  10.00  86.42  1,232,142.81 
5015+300.00  4.32  8.64  10.00  86.42  1,232,056.39 
5015+320.00  4.32  8.64  10.00  86.42  1,231,969.97 
5015+340.00  4.32  8.64  10.00  86.42  1,231,883.55 
5015+360.00  4.32  8.64  10.00  86.42  1,231,797.13 
5015+380.00  4.32  8.64  10.00  86.42  1,231,710.71 
5015+400.00  4.32  8.64  10.00  86.42  1,231,624.29 
5015+420.00  4.32  8.64  10.00  86.42  1,231,537.87 
5015+440.00  4.32  8.64  10.00  86.42  1,231,451.45 
5015+460.00  4.32  8.64  10.00  86.42  1,231,365.03 
5015+480.00  4.32  8.64  10.00  86.42  1,231,278.61 
5015+500.00  4.32  8.64  10.00  86.42  1,231,192.19 
5015+520.00  4.32  8.64  10.00  86.42  1,231,105.77 
5015+540.00  4.32  8.64  10.00  86.42  1,231,019.35 
5015+560.00  4.32  8.64  10.00  86.42  1,230,932.93 
5015+580.00  4.32  8.64  10.00  86.42  1,230,846.51 
5015+600.00  4.32  8.64  10.00  86.42  1,230,760.09 
5015+620.00  4.32  8.64  10.00  86.42  1,230,673.67 
5015+640.00  4.32  8.64  10.00  86.42  1,230,587.25 
5015+660.00  4.32  8.64  10.00  86.42  1,230,500.83 
5015+680.00  4.32  8.64  10.00  86.42  1,230,414.41 
5015+700.00  4.32  8.64  10.00  86.42  1,230,327.99 
5015+720.00  4.32  8.64  10.00  86.42  1,230,241.57 
5015+740.00  4.32  8.64  10.00  86.42  1,230,155.15 
5015+760.00  4.32  8.64  10.00  86.42  1,230,068.73 
5015+780.00  4.32  8.64  10.00  86.42  1,229,982.31 
5015+800.00  4.32  8.64  10.00  86.42  1,229,895.89 
5015+820.00  4.32  8.64  10.00  86.42  1,229,809.47 
5015+830.00  4.32  8.64  5.00  43.21  1,229,766.26 
5015+830.00  4.32  8.64  0.00  0.00  1,229,766.26 
5015+840.00  4.32  8.64  5.00  43.21  1,229,723.05 

326 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5015+860.00  4.32  8.64  10.00  86.42  1,229,636.63 


5015+880.00  4.32  8.64  10.00  86.42  1,229,550.21 
5015+900.00  4.32  8.64  10.00  86.42  1,229,463.79 
5015+920.00  4.32  8.64  10.00  86.42  1,229,377.37 
5015+940.00  4.32  8.64  10.00  86.42  1,229,290.95 
5015+960.00  4.32  8.64  10.00  86.42  1,229,204.53 
5015+980.00  4.32  8.64  10.00  86.42  1,229,118.11 
5016+000.00  4.32  8.64  10.00  86.42  1,229,031.69 
5016+020.00  4.32  8.64  10.00  86.42  1,228,945.27 
5016+040.00  4.32  8.64  10.00  86.42  1,228,858.85 
5016+060.00  4.32  8.64  10.00  86.42  1,228,772.43 
5016+080.00  4.32  8.64  10.00  86.42  1,228,686.01 
5016+100.00  4.32  8.64  10.00  86.42  1,228,599.59 
5016+120.00  4.32  8.64  10.00  86.42  1,228,513.17 
5016+140.00  4.32  8.64  10.00  86.42  1,228,426.75 
5016+160.00  4.32  8.64  10.00  86.42  1,228,340.33 
5016+180.00  4.32  8.64  10.00  86.42  1,228,253.91 
5016+200.00  4.32  8.64  10.00  86.42  1,228,167.49 
5016+220.00  4.32  8.64  10.00  86.42  1,228,081.07 
5016+240.00  4.32  8.64  10.00  86.42  1,227,994.65 
5016+260.00  4.32  8.64  10.00  86.42  1,227,908.23 
5016+280.00  4.32  8.64  10.00  86.42  1,227,821.81 
5016+300.00  4.32  8.64  10.00  86.42  1,227,735.39 
5016+320.00  4.32  8.64  10.00  86.42  1,227,648.97 
5016+340.00  4.32  8.64  10.00  86.42  1,227,562.55 
5016+360.00  4.32  8.64  10.00  86.42  1,227,476.13 
5016+380.00  4.32  8.64  10.00  86.42  1,227,389.71 
5016+400.00  4.32  8.64  10.00  86.42  1,227,303.29 
5016+420.00  4.32  8.64  10.00  86.42  1,227,216.87 
5016+440.00  4.32  8.64  10.00  86.42  1,227,130.45 
5016+460.00  4.32  8.64  10.00  86.42  1,227,044.03 
5016+480.00  4.32  8.64  10.00  86.42  1,226,957.61 
5016+500.00  4.32  8.64  10.00  86.42  1,226,871.19 
5016+520.00  4.32  8.64  10.00  86.42  1,226,784.77 
5016+520.00  4.32  8.64  0.00  0.00  1,226,784.77 
5016+540.00  4.32  8.64  10.00  86.42  1,226,698.35 
5016+560.00  4.32  8.64  10.00  86.42  1,226,611.93 
5016+580.00  4.32  8.64  10.00  86.42  1,226,525.51 
5016+600.00  4.32  8.64  10.00  86.42  1,226,439.09 
5016+600.00  4.32  8.64  0.00  0.00  1,226,439.09 
5016+620.00  4.32  8.64  10.00  86.42  1,226,352.67 
5016+640.00  4.32  8.64  10.00  86.42  1,226,266.25 
5016+660.00  4.32  8.64  10.00  86.42  1,226,179.83 
5016+680.00  4.32  8.64  10.00  86.42  1,226,093.41 
5016+700.00  4.32  8.64  10.00  86.42  1,226,006.99 

327 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5016+720.00  4.32  8.64  10.00  86.42  1,225,920.57 


5016+740.00  4.32  8.64  10.00  86.42  1,225,834.15 
5016+760.00  4.32  8.64  10.00  86.42  1,225,747.73 
5016+780.00  4.32  8.64  10.00  86.42  1,225,661.31 
5016+800.00  4.32  8.64  10.00  86.42  1,225,574.89 
5016+820.00  4.32  8.64  10.00  86.42  1,225,488.47 
5016+840.00  4.32  8.64  10.00  86.42  1,225,402.05 
5016+860.00  4.32  8.64  10.00  86.42  1,225,315.63 
5016+880.00  4.32  8.64  10.00  86.42  1,225,229.21 
5016+900.00  4.32  8.64  10.00  86.42  1,225,142.79 
5016+920.00  4.32  8.64  10.00  86.42  1,225,056.37 
5016+940.00  4.32  8.64  10.00  86.42  1,224,969.95 
5016+960.00  4.32  8.64  10.00  86.42  1,224,883.53 
5016+980.00  4.32  8.64  10.00  86.42  1,224,797.11 
5017+000.00  4.32  8.64  10.00  86.42  1,224,710.69 
5017+020.00  4.32  8.64  10.00  86.42  1,224,624.27 
5017+040.00  4.32  8.64  10.00  86.42  1,224,537.85 
5017+060.00  4.32  8.64  10.00  86.42  1,224,451.43 
5017+080.00  4.32  8.64  10.00  86.42  1,224,365.01 
5017+100.00  4.32  8.64  10.00  86.42  1,224,278.59 
5017+120.00  4.32  8.64  10.00  86.42  1,224,192.17 
5017+140.00  4.32  8.64  10.00  86.42  1,224,105.75 
5017+160.00  4.32  8.64  10.00  86.42  1,224,019.33 
5017+180.00  4.32  8.64  10.00  86.42  1,223,932.91 
5017+200.00  4.32  8.64  10.00  86.42  1,223,846.49 
5017+220.00  4.32  8.64  10.00  86.42  1,223,760.07 
5017+240.00  4.32  8.64  10.00  86.42  1,223,673.65 
5017+260.00  4.32  8.64  10.00  86.42  1,223,587.23 
5017+280.00  4.32  8.64  10.00  86.42  1,223,500.81 
5017+300.00  4.32  8.64  10.00  86.42  1,223,414.39 
5017+320.00  4.32  8.64  10.00  86.42  1,223,327.97 
5017+340.00  4.32  8.64  10.00  86.42  1,223,241.55 
5017+340.00  4.32  8.64  0.00  0.00  1,223,241.55 
5017+360.00  4.32  8.64  10.00  86.42  1,223,155.13 
5017+380.00  4.32  8.64  10.00  86.42  1,223,068.71 
5017+400.00  4.32  8.64  10.00  86.42  1,222,982.29 
5017+420.00  4.32  8.64  10.00  86.42  1,222,895.87 
5017+440.00  4.32  8.64  10.00  86.42  1,222,809.45 
5017+460.00  4.32  8.64  10.00  86.42  1,222,723.03 
5017+480.00  4.32  8.64  10.00  86.42  1,222,636.61 
5017+500.00  4.32  8.64  10.00  86.42  1,222,550.19 
5017+520.00  4.32  8.64  10.00  86.42  1,222,463.77 
5017+540.00  4.32  8.64  10.00  86.43  1,222,377.34 
5017+560.00  4.32  8.64  10.00  86.43  1,222,290.91 
5017+563.95  4.32  8.64  1.97  17.05  1,222,273.87 

328 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5017+580.00  4.32  8.64  8.03  69.37  1,222,204.49 


5017+593.95  4.32  8.64  6.97  60.26  1,222,144.24 
5017+600.00  4.32  8.64  3.03  26.16  1,222,118.07 
5017+620.00  4.32  8.64  10.00  86.42  1,222,031.65 
5017+640.00  4.32  8.64  10.00  86.42  1,221,945.23 
5017+660.00  4.32  8.64  10.00  86.42  1,221,858.81 
5017+678.40  4.32  8.64  9.20  79.51  1,221,779.31 
5017+680.00  4.32  8.64  0.80  6.91  1,221,772.39 
5017+680.00  4.32  8.64  0.00  0.00  1,221,772.39 
5017+700.00  4.32  8.64  10.00  86.42  1,221,685.97 
5017+708.40  4.32  8.64  4.20  36.30  1,221,649.68 
5017+720.00  4.32  8.64  5.80  50.12  1,221,599.55 
5017+740.00  4.32  8.64  10.00  86.42  1,221,513.13 
5017+760.00  4.32  8.64  10.00  86.42  1,221,426.71 
5017+780.00  4.32  8.64  10.00  86.42  1,221,340.29 
5017+800.00  4.32  8.64  10.00  86.42  1,221,253.87 
5017+820.00  4.32  8.64  10.00  86.42  1,221,167.45 
5017+840.00  4.32  8.64  10.00  86.42  1,221,081.03 
5017+860.00  4.32  8.64  10.00  86.42  1,220,994.61 
5017+880.00  4.32  8.64  10.00  86.42  1,220,908.19 
5017+900.00  4.32  8.64  10.00  86.42  1,220,821.77 
5017+920.00  4.32  8.64  10.00  86.42  1,220,735.35 
5017+940.00  4.32  8.64  10.00  86.42  1,220,648.93 
5017+960.00  4.32  8.64  10.00  86.42  1,220,562.51 
5017+980.00  4.32  8.64  10.00  86.42  1,220,476.09 
5018+000.00  4.32  8.64  10.00  86.43  1,220,389.66 
5018+020.00  4.32  8.64  10.00  86.43  1,220,303.23 
5018+040.00  4.32  8.64  10.00  86.42  1,220,216.81 
5018+040.00  4.32  8.64  0.00  0.00  1,220,216.81 
5018+060.00  4.32  8.64  10.00  86.42  1,220,130.39 
5018+080.00  4.32  8.64  10.00  86.42  1,220,043.97 
5018+100.00  4.32  8.64  10.00  86.42  1,219,957.55 
5018+120.00  4.32  8.64  10.00  86.42  1,219,871.13 
5018+140.00  4.32  8.64  10.00  86.42  1,219,784.71 
5018+160.00  4.32  8.64  10.00  86.42  1,219,698.29 
5018+180.00  4.32  8.64  10.00  86.42  1,219,611.87 
5018+200.00  4.32  8.64  10.00  86.42  1,219,525.45 
5018+220.00  4.32  8.64  10.00  86.42  1,219,439.03 
5018+240.00  4.32  8.64  10.00  86.42  1,219,352.61 
5018+260.00  4.32  8.64  10.00  86.42  1,219,266.19 
5018+280.00  4.32  8.64  10.00  86.42  1,219,179.77 
5018+300.00  4.32  8.64  10.00  86.42  1,219,093.35 
5018+320.00  4.32  8.64  10.00  86.42  1,219,006.93 
5018+340.00  4.32  8.64  10.00  86.42  1,218,920.51 
5018+360.00  4.32  8.64  10.00  86.42  1,218,834.09 

329 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5018+380.00  4.32  8.64  10.00  86.42  1,218,747.67 


5018+400.00  4.32  8.64  10.00  86.42  1,218,661.25 
5018+420.00  4.32  8.64  10.00  86.42  1,218,574.83 
5018+440.00  4.32  8.64  10.00  86.42  1,218,488.41 
5018+460.00  4.32  8.64  10.00  86.42  1,218,401.99 
5018+480.00  4.32  8.64  10.00  86.42  1,218,315.57 
5018+500.00  4.32  8.64  10.00  86.43  1,218,229.14 
5018+520.00  4.32  8.64  10.00  86.43  1,218,142.71 
5018+540.00  4.32  8.64  10.00  86.42  1,218,056.29 
5018+560.00  4.32  8.64  10.00  86.42  1,217,969.87 
5018+580.00  4.32  8.64  10.00  86.42  1,217,883.45 
5018+600.00  4.32  8.64  10.00  86.42  1,217,797.03 
5018+620.00  4.32  8.64  10.00  86.42  1,217,710.61 
5018+640.00  4.32  8.64  10.00  86.42  1,217,624.19 
5018+660.00  4.32  8.64  10.00  86.42  1,217,537.77 
5018+680.00  4.32  8.64  10.00  86.42  1,217,451.35 
5018+700.00  4.32  8.64  10.00  86.43  1,217,364.92 
5018+720.00  4.32  8.64  10.00  86.43  1,217,278.49 
5018+740.00  4.32  8.64  10.00  86.43  1,217,192.06 
5018+760.00  4.32  8.64  10.00  86.43  1,217,105.63 
5018+780.00  4.32  8.64  10.00  86.42  1,217,019.21 
5018+800.00  4.32  8.64  10.00  86.42  1,216,932.79 
5018+820.00  4.32  8.64  10.00  86.42  1,216,846.37 
5018+840.00  4.32  8.64  10.00  86.42  1,216,759.95 
5018+860.00  4.32  8.64  10.00  86.42  1,216,673.53 
5018+880.00  4.32  8.64  10.00  86.42  1,216,587.11 
5018+900.00  4.32  8.64  10.00  86.42  1,216,500.69 
5018+920.00  4.32  8.64  10.00  86.42  1,216,414.27 
5018+939.87  4.32  8.64  9.93  85.84  1,216,328.43 
5018+940.00  4.32  8.64  0.07  0.58  1,216,327.85 
5018+960.00  4.32  8.64  10.00  86.42  1,216,241.43 
5018+979.87  4.32  8.64  9.93  85.84  1,216,155.59 
5018+980.00  4.32  8.64  0.07  0.58  1,216,155.01 
5019+000.00  4.32  8.64  10.00  86.42  1,216,068.59 
5019+020.00  4.32  8.64  10.00  86.42  1,215,982.17 
5019+040.00  4.32  8.64  10.00  86.42  1,215,895.75 
5019+060.00  4.32  8.64  10.00  86.42  1,215,809.33 
5019+062.97  4.32  8.64  1.48  12.82  1,215,796.51 
5019+080.00  4.32  8.64  8.52  73.61  1,215,722.90 
5019+100.00  4.32  8.64  10.00  86.43  1,215,636.47 
5019+102.97  4.32  8.64  1.48  12.82  1,215,623.65 
5019+120.00  4.32  8.64  8.52  73.60  1,215,550.05 
5019+140.00  4.32  8.64  10.00  86.42  1,215,463.63 
5019+160.00  4.32  8.64  10.00  86.42  1,215,377.21 
5019+180.00  4.32  8.64  10.00  86.42  1,215,290.79 

330 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5019+200.00  4.32  8.64  10.00  86.42  1,215,204.37 


5019+220.00  4.32  8.64  10.00  86.42  1,215,117.95 
5019+240.00  4.32  8.64  10.00  86.42  1,215,031.53 
5019+260.00  4.32  8.64  10.00  86.42  1,214,945.11 
5019+280.00  4.32  8.64  10.00  86.42  1,214,858.69 
5019+300.00  4.32  8.64  10.00  86.42  1,214,772.27 
5019+320.00  4.32  8.64  10.00  86.42  1,214,685.85 
5019+340.00  4.32  8.64  10.00  86.42  1,214,599.43 
5019+360.00  4.32  8.64  10.00  86.42  1,214,513.01 
5019+380.00  4.32  8.64  10.00  86.42  1,214,426.59 
5019+400.00  4.32  8.64  10.00  86.42  1,214,340.17 
5019+420.00  4.32  8.64  10.00  86.42  1,214,253.75 
5019+440.00  4.32  8.64  10.00  86.42  1,214,167.33 
5019+450.00  4.14  8.46  5.00  42.31  1,214,125.02 
5019+450.00  4.14  8.28  0.00  0.00  1,214,125.02 
5019+450.00  0.00  4.14  0.00  0.00  1,214,125.02 
5019+460.00  0.00  0.00  5.00  0.00  1,214,125.02 
5019+478.00  0.00  0.00  9.00  0.00  1,214,125.02 
5019+478.00  0.00  0.00  0.00  0.00  1,214,125.02 
5019+478.00  4.32  4.32  0.00  0.00  1,214,125.02 
5019+480.00  4.32  8.64  1.00  8.64  1,214,116.38 
5019+500.00  4.32  8.64  10.00  86.42  1,214,029.96 
5019+520.00  4.32  8.64  10.00  86.42  1,213,943.54 
5019+540.00  4.32  8.64  10.00  86.42  1,213,857.12 
5019+560.00  4.32  8.64  10.00  86.42  1,213,770.70 
5019+580.00  4.32  8.64  10.00  86.42  1,213,684.28 
5019+600.00  4.32  8.64  10.00  86.42  1,213,597.86 
5019+620.00  4.32  8.64  10.00  86.42  1,213,511.44 
5019+640.00  4.32  8.64  10.00  86.42  1,213,425.02 
5019+660.00  4.32  8.64  10.00  86.42  1,213,338.60 
5019+680.00  4.32  8.64  10.00  86.42  1,213,252.18 
5019+700.00  4.32  8.64  10.00  86.42  1,213,165.76 
5019+700.00  4.32  8.64  0.00  0.00  1,213,165.76 
5019+720.00  4.32  8.64  10.00  86.42  1,213,079.34 
5019+740.00  4.32  8.64  10.00  86.42  1,212,992.92 
5019+760.00  4.32  8.64  10.00  86.42  1,212,906.50 
5019+780.00  4.32  8.64  10.00  86.42  1,212,820.08 
5019+800.00  4.32  8.64  10.00  86.42  1,212,733.66 
5019+820.00  4.32  8.64  10.00  86.42  1,212,647.24 
5019+840.00  4.32  8.64  10.00  86.42  1,212,560.82 
5019+860.00  4.32  8.64  10.00  86.42  1,212,474.40 
5019+880.00  4.32  8.64  10.00  86.42  1,212,387.98 
5019+900.00  4.32  8.64  10.00  86.42  1,212,301.56 
5019+920.00  4.32  8.64  10.00  86.42  1,212,215.14 
5019+940.00  4.32  8.64  10.00  86.42  1,212,128.72 

331 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5019+960.00  4.32  8.64  10.00  86.42  1,212,042.30 


5019+980.00  4.32  8.64  10.00  86.42  1,211,955.88 
5020+000.00  4.32  8.64  10.00  86.42  1,211,869.46 
5020+020.00  4.32  8.64  10.00  86.42  1,211,783.04 
5020+040.00  4.32  8.64  10.00  86.42  1,211,696.62 
5020+060.00  4.32  8.64  10.00  86.42  1,211,610.20 
5020+080.00  4.32  8.64  10.00  86.42  1,211,523.78 
5020+100.00  4.32  8.64  10.00  86.42  1,211,437.36 
5020+120.00  4.32  8.64  10.00  86.42  1,211,350.94 
5020+140.00  4.32  8.64  10.00  86.42  1,211,264.52 
5020+160.00  4.32  8.64  10.00  86.42  1,211,178.10 
5020+180.00  4.32  8.64  10.00  86.42  1,211,091.68 
5020+200.00  4.32  8.64  10.00  86.42  1,211,005.26 
5020+220.00  4.32  8.64  10.00  86.42  1,210,918.84 
5020+240.00  4.32  8.64  10.00  86.42  1,210,832.42 
5020+260.00  4.32  8.64  10.00  86.42  1,210,746.00 
5020+280.00  4.32  8.64  10.00  86.42  1,210,659.58 
5020+300.00  4.32  8.64  10.00  86.42  1,210,573.16 
5020+320.00  4.32  8.64  10.00  86.42  1,210,486.74 
5020+340.00  4.32  8.64  10.00  86.42  1,210,400.32 
5020+360.00  4.32  8.64  10.00  86.42  1,210,313.90 
5020+380.00  4.32  8.64  10.00  86.42  1,210,227.48 
5020+400.00  4.32  8.64  10.00  86.42  1,210,141.06 
5020+420.00  4.32  8.64  10.00  86.42  1,210,054.64 
5020+440.00  4.32  8.64  10.00  86.42  1,209,968.22 
5020+460.00  4.32  8.64  10.00  86.42  1,209,881.80 
5020+480.00  4.32  8.64  10.00  86.42  1,209,795.38 
5020+500.00  4.32  8.64  10.00  86.42  1,209,708.96 
5020+520.00  4.32  8.64  10.00  86.42  1,209,622.54 
5020+540.00  4.32  8.64  10.00  86.42  1,209,536.12 
5020+560.00  4.32  8.64  10.00  86.42  1,209,449.70 
5020+580.00  4.32  8.64  10.00  86.42  1,209,363.28 
5020+600.00  4.32  8.64  10.00  86.42  1,209,276.86 
5020+620.00  4.32  8.64  10.00  86.42  1,209,190.44 
5020+640.00  4.32  8.64  10.00  86.42  1,209,104.02 
5020+660.00  4.32  8.64  10.00  86.42  1,209,017.60 
5020+680.00  4.32  8.64  10.00  86.42  1,208,931.18 
5020+700.00  4.32  8.64  10.00  86.42  1,208,844.76 
5020+720.00  4.32  8.64  10.00  86.42  1,208,758.34 
5020+740.00  4.32  8.64  10.00  86.42  1,208,671.92 
5020+760.00  4.32  8.64  10.00  86.42  1,208,585.50 
5020+780.00  4.32  8.64  10.00  86.42  1,208,499.08 
5020+800.00  4.32  8.64  10.00  86.42  1,208,412.66 
5020+820.00  4.32  8.64  10.00  86.42  1,208,326.24 
5020+840.00  4.32  8.64  10.00  86.42  1,208,239.82 

332 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5020+860.00  4.32  8.64  10.00  86.42  1,208,153.40 


5020+880.00  4.32  8.64  10.00  86.42  1,208,066.98 
5020+900.00  4.32  8.64  10.00  86.42  1,207,980.56 
5020+920.00  4.32  8.64  10.00  86.42  1,207,894.14 
5020+940.00  4.32  8.64  10.00  86.42  1,207,807.72 
5020+960.00  4.32  8.64  10.00  86.42  1,207,721.30 
5020+980.00  4.32  8.64  10.00  86.42  1,207,634.88 
5021+000.00  4.32  8.64  10.00  86.42  1,207,548.46 
5021+020.00  4.32  8.64  10.00  86.42  1,207,462.04 
5021+040.00  4.32  8.64  10.00  86.42  1,207,375.62 
5021+060.00  4.32  8.64  10.00  86.42  1,207,289.20 
5021+080.00  4.32  8.64  10.00  86.42  1,207,202.78 
5021+100.00  4.32  8.64  10.00  86.42  1,207,116.36 
5021+120.00  4.32  8.64  10.00  86.42  1,207,029.94 
5021+140.00  4.32  8.64  10.00  86.42  1,206,943.52 
5021+160.00  4.32  8.64  10.00  86.42  1,206,857.10 
5021+180.00  4.32  8.64  10.00  86.42  1,206,770.68 
5021+200.00  4.32  8.64  10.00  86.42  1,206,684.26 
5021+220.00  4.32  8.64  10.00  86.42  1,206,597.84 
5021+240.00  4.32  8.64  10.00  86.42  1,206,511.42 
5021+260.00  4.32  8.64  10.00  86.42  1,206,425.00 
5021+280.00  4.32  8.64  10.00  86.42  1,206,338.58 
5021+300.00  4.32  8.64  10.00  86.42  1,206,252.16 
5021+320.00  4.32  8.64  10.00  86.42  1,206,165.74 
5021+340.00  4.32  8.64  10.00  86.42  1,206,079.32 
5021+360.00  4.32  8.64  10.00  86.42  1,205,992.90 
5021+380.00  4.32  8.64  10.00  86.42  1,205,906.48 
5021+400.00  4.32  8.64  10.00  86.42  1,205,820.06 
5021+420.00  4.32  8.64  10.00  86.42  1,205,733.64 
5021+440.00  4.32  8.64  10.00  86.42  1,205,647.22 
5021+460.00  4.32  8.64  10.00  86.42  1,205,560.80 
5021+480.00  4.32  8.64  10.00  86.42  1,205,474.38 
5021+500.00  4.32  8.64  10.00  86.42  1,205,387.96 
5021+520.00  4.32  8.64  10.00  86.42  1,205,301.54 
5021+540.00  4.32  8.64  10.00  86.42  1,205,215.12 
5021+560.00  4.32  8.64  10.00  86.42  1,205,128.70 
5021+560.00  4.32  8.64  0.00  0.00  1,205,128.70 
5021+580.00  4.32  8.64  10.00  86.42  1,205,042.28 
5021+600.00  4.32  8.64  10.00  86.42  1,204,955.86 
5021+620.00  4.32  8.64  10.00  86.42  1,204,869.44 
5021+640.00  4.32  8.64  10.00  86.42  1,204,783.02 
5021+660.00  4.32  8.64  10.00  86.42  1,204,696.60 
5021+680.00  4.32  8.64  10.00  86.42  1,204,610.18 
5021+700.00  4.32  8.64  10.00  86.42  1,204,523.76 
5021+720.00  4.32  8.64  10.00  86.42  1,204,437.34 

333 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5021+740.00  4.32  8.64  10.00  86.42  1,204,350.92 


5021+760.00  4.32  8.64  10.00  86.42  1,204,264.50 
5021+780.00  4.32  8.64  10.00  86.42  1,204,178.08 
5021+800.00  4.32  8.64  10.00  86.42  1,204,091.66 
5021+820.00  4.32  8.64  10.00  86.42  1,204,005.24 
5021+840.00  4.32  8.64  10.00  86.42  1,203,918.82 
5021+860.00  4.32  8.64  10.00  86.42  1,203,832.40 
5021+880.00  4.32  8.64  10.00  86.42  1,203,745.98 
5021+900.00  4.32  8.64  10.00  86.42  1,203,659.56 
5021+920.00  4.32  8.64  10.00  86.42  1,203,573.14 
5021+920.00  4.32  8.64  0.00  0.00  1,203,573.14 
5021+940.00  4.32  8.64  10.00  86.42  1,203,486.72 
5021+960.00  4.32  8.64  10.00  86.42  1,203,400.30 
5021+980.00  4.32  8.64  10.00  86.42  1,203,313.88 
5022+000.00  4.32  8.64  10.00  86.42  1,203,227.46 
5022+020.00  4.32  8.64  10.00  86.42  1,203,141.04 
5022+040.00  4.32  8.64  10.00  86.42  1,203,054.62 
5022+060.00  4.32  8.64  10.00  86.42  1,202,968.20 
5022+080.00  4.32  8.64  10.00  86.42  1,202,881.78 
5022+100.00  4.32  8.64  10.00  86.42  1,202,795.36 
5022+120.00  4.32  8.64  10.00  86.42  1,202,708.94 
5022+140.00  4.32  8.64  10.00  86.42  1,202,622.52 
5022+160.00  4.32  8.64  10.00  86.42  1,202,536.10 
5022+180.00  4.32  8.64  10.00  86.42  1,202,449.68 
5022+200.00  4.32  8.64  10.00  86.42  1,202,363.26 
5022+220.00  4.32  8.64  10.00  86.42  1,202,276.84 
5022+240.00  4.32  8.64  10.00  86.42  1,202,190.42 
5022+260.00  4.32  8.64  10.00  86.42  1,202,104.00 
5022+280.00  4.32  8.64  10.00  86.42  1,202,017.58 
5022+280.00  4.32  8.64  0.00  0.00  1,202,017.58 
5022+300.00  4.32  8.64  10.00  86.42  1,201,931.16 
5022+320.00  4.32  8.64  10.00  86.42  1,201,844.74 
5022+340.00  4.32  8.64  10.00  86.42  1,201,758.32 
5022+360.00  4.32  8.64  10.00  86.42  1,201,671.90 
5022+380.00  4.32  8.64  10.00  86.42  1,201,585.48 
5022+400.00  4.32  8.64  10.00  86.42  1,201,499.06 
5022+420.00  4.32  8.64  10.00  86.42  1,201,412.64 
5022+440.00  4.32  8.64  10.00  86.42  1,201,326.22 
5022+460.00  4.32  8.64  10.00  86.42  1,201,239.80 
5022+480.00  4.32  8.64  10.00  86.42  1,201,153.38 
5022+490.00  4.32  8.64  5.00  43.21  1,201,110.17 
5022+490.00  4.32  8.64  0.00  0.00  1,201,110.17 
5022+500.00  4.32  8.64  5.00  43.21  1,201,066.96 
5022+520.00  4.32  8.64  10.00  86.42  1,200,980.54 
5022+540.00  4.32  8.64  10.00  86.42  1,200,894.12 

334 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5022+560.00  4.32  8.64  10.00  86.42  1,200,807.70 


5022+580.00  4.32  8.64  10.00  86.42  1,200,721.28 
5022+600.00  4.32  8.64  10.00  86.42  1,200,634.86 
5022+620.00  4.32  8.64  10.00  86.42  1,200,548.44 
5022+640.00  4.32  8.64  10.00  86.42  1,200,462.02 
5022+660.00  4.32  8.64  10.00  86.42  1,200,375.60 
5022+680.00  4.32  8.64  10.00  86.42  1,200,289.18 
5022+685.75  4.32  8.64  2.87  24.82  1,200,264.36 
5022+700.00  4.32  8.64  7.13  61.60  1,200,202.76 
5022+715.75  4.32  8.64  7.87  68.03  1,200,134.73 
5022+720.00  4.32  8.64  2.13  18.39  1,200,116.34 
5022+740.00  4.32  8.64  10.00  86.42  1,200,029.92 
5022+760.00  4.32  8.64  10.00  86.42  1,199,943.50 
5022+780.00  4.32  8.64  10.00  86.42  1,199,857.08 
5022+800.00  4.32  8.64  10.00  86.42  1,199,770.66 
5022+800.10  4.32  8.64  0.05  0.44  1,199,770.23 
5022+820.00  4.32  8.64  9.95  85.98  1,199,684.24 
5022+830.10  4.32  8.64  5.05  43.65  1,199,640.60 
5022+840.00  4.32  8.64  4.95  42.77  1,199,597.82 
5022+860.00  4.32  8.64  10.00  86.42  1,199,511.40 
5022+880.00  4.32  8.64  10.00  86.42  1,199,424.98 
5022+900.00  4.32  8.64  10.00  86.42  1,199,338.56 
5022+920.00  4.32  8.64  10.00  86.42  1,199,252.14 
5022+940.00  4.32  8.64  10.00  86.42  1,199,165.72 
5022+960.00  4.32  8.64  10.00  86.42  1,199,079.30 
5022+980.00  4.32  8.64  10.00  86.42  1,198,992.88 
5023+000.00  4.32  8.64  10.00  86.42  1,198,906.46 
5023+020.00  4.32  8.64  10.00  86.42  1,198,820.04 
5023+040.00  4.32  8.64  10.00  86.42  1,198,733.62 
5023+060.00  4.32  8.64  10.00  86.42  1,198,647.20 
5023+080.00  4.32  8.64  10.00  86.42  1,198,560.78 
5023+100.00  4.32  8.64  10.00  86.42  1,198,474.36 
5023+100.00  4.32  8.64  0.00  0.00  1,198,474.36 
5023+120.00  4.32  8.64  10.00  86.42  1,198,387.94 
5023+140.00  4.32  8.64  10.00  86.42  1,198,301.52 
5023+160.00  4.32  8.64  10.00  86.42  1,198,215.10 
5023+180.00  4.32  8.64  10.00  86.42  1,198,128.68 
5023+200.00  4.32  8.64  10.00  86.42  1,198,042.26 
5023+220.00  4.32  8.64  10.00  86.42  1,197,955.84 
5023+220.00  4.32  8.64  0.00  0.00  1,197,955.84 
5023+240.00  4.32  8.64  10.00  86.42  1,197,869.42 
5023+260.00  4.32  8.64  10.00  86.42  1,197,783.00 
5023+280.00  4.32  8.64  10.00  86.42  1,197,696.58 
5023+300.00  4.32  8.64  10.00  86.42  1,197,610.16 
5023+320.00  4.32  8.64  10.00  86.42  1,197,523.74 

335 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5023+340.00  4.32  8.64  10.00  86.42  1,197,437.32 


5023+360.00  4.32  8.64  10.00  86.42  1,197,350.90 
5023+380.00  4.32  8.64  10.00  86.42  1,197,264.48 
5023+400.00  4.32  8.64  10.00  86.42  1,197,178.06 
5023+420.00  4.32  8.64  10.00  86.42  1,197,091.64 
5023+440.00  4.32  8.64  10.00  86.42  1,197,005.22 
5023+460.00  4.32  8.64  10.00  86.42  1,196,918.80 
5023+480.00  4.32  8.64  10.00  86.42  1,196,832.38 
5023+500.00  4.32  8.64  10.00  86.42  1,196,745.96 
5023+520.00  4.32  8.64  10.00  86.42  1,196,659.54 
5023+540.00  4.32  8.64  10.00  86.42  1,196,573.12 
5023+560.00  4.32  8.64  10.00  86.42  1,196,486.70 
5023+580.00  4.32  8.64  10.00  86.42  1,196,400.28 
5023+600.00  4.32  8.64  10.00  86.42  1,196,313.86 
5023+620.00  4.32  8.64  10.00  86.42  1,196,227.44 
5023+640.00  4.32  8.64  10.00  86.42  1,196,141.02 
5023+660.00  4.32  8.64  10.00  86.42  1,196,054.60 
5023+680.00  4.32  8.64  10.00  86.42  1,195,968.18 
5023+700.00  4.32  8.64  10.00  86.42  1,195,881.76 
5023+720.00  4.32  8.64  10.00  86.42  1,195,795.34 
5023+740.00  4.32  8.64  10.00  86.42  1,195,708.92 
5023+760.00  4.32  8.64  10.00  86.42  1,195,622.50 
5023+770.00  4.32  8.64  5.00  43.21  1,195,579.29 
5023+770.00  4.32  8.64  0.00  0.00  1,195,579.29 
5023+780.00  4.32  8.64  5.00  43.21  1,195,536.08 
5023+800.00  4.32  8.64  10.00  86.42  1,195,449.66 
5023+820.00  4.32  8.64  10.00  86.42  1,195,363.24 
5023+840.00  4.32  8.64  10.00  86.42  1,195,276.82 
5023+860.00  4.32  8.64  10.00  86.42  1,195,190.40 
5023+880.00  4.32  8.64  10.00  86.42  1,195,103.98 
5023+900.00  4.32  8.64  10.00  86.42  1,195,017.56 
5023+900.00  4.32  8.64  0.00  0.00  1,195,017.56 
5023+920.00  4.32  8.64  10.00  86.42  1,194,931.14 
5023+940.00  4.32  8.64  10.00  86.42  1,194,844.72 
5023+960.00  4.32  8.64  10.00  86.42  1,194,758.30 
5023+980.00  4.32  8.64  10.00  86.42  1,194,671.88 
5024+000.00  4.32  8.64  10.00  86.42  1,194,585.46 
5024+007.22  4.32  8.64  3.61  31.21  1,194,554.25 
5024+020.00  4.32  8.64  6.39  55.21  1,194,499.04 
5024+040.00  4.32  8.64  10.00  86.42  1,194,412.62 
5024+060.00  4.32  8.64  10.00  86.42  1,194,326.20 
5024+080.00  4.32  8.64  10.00  86.42  1,194,239.78 
5024+100.00  4.32  8.64  10.00  86.42  1,194,153.36 
5024+120.00  4.32  8.64  10.00  86.42  1,194,066.94 
5024+137.22  4.32  8.64  8.61  74.42  1,193,992.52 

336 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5024+140.00  4.32  8.64  1.39  12.00  1,193,980.52 


5024+160.00  4.32  8.64  10.00  86.42  1,193,894.10 
5024+180.00  4.32  8.64  10.00  86.42  1,193,807.68 
5024+200.00  4.32  8.64  10.00  86.42  1,193,721.26 
5024+220.00  4.32  8.64  10.00  86.42  1,193,634.84 
5024+240.00  4.32  8.64  10.00  86.42  1,193,548.42 
5024+250.00  4.32  8.64  5.00  43.21  1,193,505.21 
5024+260.00  4.32  8.64  5.00  43.21  1,193,462.00 
5024+280.00  4.32  8.64  10.00  86.42  1,193,375.58 
5024+300.00  4.32  8.64  10.00  86.42  1,193,289.16 
5024+320.00  4.32  8.64  10.00  86.42  1,193,202.74 
5024+340.00  4.32  8.64  10.00  86.42  1,193,116.32 
5024+360.00  4.32  8.64  10.00  86.42  1,193,029.90 
5024+380.00  4.32  8.64  10.00  86.42  1,192,943.48 
5024+400.00  4.32  8.64  10.00  86.42  1,192,857.06 
5024+420.00  4.32  8.64  10.00  86.42  1,192,770.64 
5024+440.00  4.32  8.64  10.00  86.42  1,192,684.22 
5024+460.00  4.32  8.64  10.00  86.42  1,192,597.80 
5024+480.00  4.32  8.64  10.00  86.42  1,192,511.38 
5024+500.00  4.32  8.64  10.00  86.42  1,192,424.96 
5024+515.53  4.32  8.64  7.76  67.08  1,192,357.88 
5024+520.00  4.77  9.09  2.24  20.35  1,192,337.53 
5024+535.53  6.34  11.11  7.76  86.24  1,192,251.29 
5024+540.00  6.34  12.68  2.24  28.36  1,192,222.93 
5024+560.00  6.34  12.68  10.00  126.76  1,192,096.17 
5024+580.00  6.34  12.68  10.00  126.76  1,191,969.41 
5024+588.65  6.34  12.68  4.32  54.81  1,191,914.60 
5024+600.00  6.34  12.68  5.68  71.95  1,191,842.64 
5024+620.00  6.34  12.68  10.00  126.77  1,191,715.87 
5024+640.00  6.34  12.68  10.00  126.76  1,191,589.11 
5024+640.00  6.34  12.68  0.00  0.00  1,191,589.11 
5024+660.00  6.34  12.68  10.00  126.76  1,191,462.35 
5024+680.00  6.34  12.68  10.00  126.77  1,191,335.58 
5024+700.00  6.34  12.68  10.00  126.77  1,191,208.81 
5024+718.65  6.34  12.68  9.32  118.19  1,191,090.62 
5024+720.00  6.34  12.68  0.68  8.57  1,191,082.05 
5024+740.00  6.34  12.68  10.00  126.76  1,190,955.29 
5024+760.00  6.34  12.68  10.00  126.76  1,190,828.53 
5024+780.00  6.34  12.68  10.00  126.76  1,190,701.77 
5024+800.00  6.34  12.68  10.00  126.76  1,190,575.01 
5024+815.00  6.34  12.68  7.50  95.07  1,190,479.94 
5024+820.00  6.34  12.68  2.50  31.69  1,190,448.25 
5024+825.00  6.34  12.68  2.50  31.69  1,190,416.56 
5024+835.00  6.37  12.70  5.00  63.52  1,190,353.04 
5024+840.00  6.42  12.78  2.50  31.96  1,190,321.09 

337 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5024+845.00  6.47  12.89  2.50  32.21  1,190,288.87 


5024+855.00  6.65  13.12  5.00  65.58  1,190,223.30 
5024+860.00  6.77  13.42  2.50  33.55  1,190,189.75 
5024+865.00  6.90  13.67  2.50  34.18  1,190,155.57 
5024+875.00  7.17  14.06  5.00  70.32  1,190,085.26 
5024+880.00  7.30  14.46  2.50  36.16  1,190,049.10 
5024+885.00  7.43  14.73  2.50  36.83  1,190,012.27 
5024+895.00  7.70  15.13  5.00  75.66  1,189,936.61 
5024+900.00  7.83  15.53  2.50  38.82  1,189,897.79 
5024+905.00  7.96  15.79  2.50  39.48  1,189,858.31 
5024+915.00  8.16  16.12  5.00  80.62  1,189,777.69 
5024+920.00  8.23  16.39  2.50  40.97  1,189,736.72 
5024+925.00  8.29  16.52  2.50  41.29  1,189,695.43 
5024+935.00  8.34  16.63  5.00  83.13  1,189,612.30 
5024+940.00  8.34  16.68  2.50  41.69  1,189,570.62 
5024+945.00  8.34  16.68  2.50  41.69  1,189,528.93 
5024+955.00  8.34  16.68  5.00  83.38  1,189,445.55 
5024+960.00  8.34  16.68  2.50  41.69  1,189,403.86 
5024+980.00  8.34  16.68  10.00  166.76  1,189,237.10 
5025+000.00  8.34  16.68  10.00  166.76  1,189,070.34 
5025+000.00  8.34  16.68  0.00  0.00  1,189,070.34 
5025+020.00  8.34  16.68  10.00  166.76  1,188,903.58 
5025+040.00  8.34  16.68  10.00  166.76  1,188,736.82 
5025+060.00  8.34  16.68  10.00  166.76  1,188,570.06 
5025+080.00  8.34  16.68  10.00  166.76  1,188,403.30 
5025+100.00  8.34  16.68  10.00  166.76  1,188,236.54 
5025+120.00  8.34  16.68  10.00  166.76  1,188,069.78 
5025+140.00  8.34  16.68  10.00  166.76  1,187,903.02 
5025+160.00  8.34  16.68  10.00  166.76  1,187,736.26 
5025+180.00  8.34  16.68  10.00  166.76  1,187,569.50 
5025+200.00  8.34  16.68  10.00  166.76  1,187,402.74 
5025+220.00  8.34  16.68  10.00  166.76  1,187,235.98 
5025+240.00  8.34  16.68  10.00  166.76  1,187,069.22 
5025+260.00  8.34  16.68  10.00  166.76  1,186,902.46 
5025+270.00  8.34  16.68  5.00  83.38  1,186,819.08 
5025+280.00  8.32  16.66  5.00  83.29  1,186,735.79 
5025+290.00  8.23  16.55  5.00  82.74  1,186,653.06 
5025+300.00  8.06  16.29  5.00  81.44  1,186,571.62 
5025+310.00  7.82  15.88  5.00  79.38  1,186,492.24 
5025+320.00  7.55  15.37  5.00  76.84  1,186,415.41 
5025+330.00  7.28  14.83  5.00  74.17  1,186,341.24 
5025+340.00  7.02  14.30  5.00  71.50  1,186,269.75 
5025+350.00  6.75  13.77  5.00  68.84  1,186,200.91 
5025+360.00  6.54  13.29  5.00  66.45  1,186,134.47 
5025+370.00  6.40  12.94  5.00  64.70  1,186,069.77 

338 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5025+380.00  6.34  12.74  5.00  63.71  1,186,006.06 


5025+390.00  6.34  12.68  5.00  63.40  1,185,942.67 
5025+400.00  6.34  12.68  5.00  63.38  1,185,879.29 
5025+420.00  6.34  12.68  10.00  126.76  1,185,752.53 
5025+440.00  6.34  12.68  10.00  126.76  1,185,625.77 
5025+460.00  6.34  12.68  10.00  126.76  1,185,499.01 
5025+480.00  6.34  12.68  10.00  126.76  1,185,372.25 
5025+500.00  6.34  12.68  10.00  126.76  1,185,245.49 
5025+520.00  6.34  12.68  10.00  126.76  1,185,118.73 
5025+521.36  6.34  12.68  0.68  8.61  1,185,110.12 
5025+540.00  4.46  10.80  9.32  100.63  1,185,009.49 
5025+541.36  4.32  8.78  0.68  5.96  1,185,003.53 
5025+550.36  4.32  8.64  4.50  38.89  1,184,964.64 
5025+560.00  4.32  8.64  4.82  41.66  1,184,922.98 
5025+580.00  4.32  8.64  10.00  86.42  1,184,836.56 
5025+600.00  4.32  8.64  10.00  86.42  1,184,750.14 
5025+620.00  4.32  8.64  10.00  86.42  1,184,663.72 
5025+640.00  4.32  8.64  10.00  86.42  1,184,577.30 
5025+640.36  4.32  8.64  0.18  1.55  1,184,575.75 
5025+660.00  4.32  8.64  9.82  84.88  1,184,490.87 
5025+680.00  4.32  8.64  10.00  86.43  1,184,404.44 
5025+700.00  4.32  8.64  10.00  86.43  1,184,318.01 
5025+720.00  4.32  8.64  10.00  86.43  1,184,231.58 
5025+733.68  4.32  8.64  6.84  59.10  1,184,172.47 
5025+740.00  4.32  8.64  3.16  27.32  1,184,145.16 
5025+760.00  4.32  8.64  10.00  86.42  1,184,058.74 
5025+780.00  4.32  8.64  10.00  86.42  1,183,972.32 
5025+800.00  4.32  8.64  10.00  86.42  1,183,885.90 
5025+820.00  4.32  8.64  10.00  86.42  1,183,799.48 
5025+823.68  4.32  8.64  1.84  15.89  1,183,783.58 
5025+840.00  4.32  8.64  8.16  70.53  1,183,713.06 
5025+860.00  4.32  8.64  10.00  86.42  1,183,626.64 
5025+880.00  4.32  8.64  10.00  86.42  1,183,540.22 
5025+882.88  4.32  8.64  1.44  12.46  1,183,527.76 
5025+900.00  4.32  8.64  8.56  73.96  1,183,453.80 
5025+920.00  4.32  8.64  10.00  86.42  1,183,367.38 
5025+940.00  4.32  8.64  10.00  86.42  1,183,280.96 
5025+960.00  4.32  8.64  10.00  86.42  1,183,194.54 
5025+980.00  4.32  8.64  10.00  86.42  1,183,108.12 
5026+000.00  4.32  8.64  10.00  86.42  1,183,021.70 
5026+020.00  4.32  8.64  10.00  86.42  1,182,935.28 
5026+040.00  4.32  8.64  10.00  86.42  1,182,848.86 
5026+060.00  4.32  8.64  10.00  86.42  1,182,762.44 
5026+080.00  4.32  8.64  10.00  86.42  1,182,676.02 
5026+100.00  4.32  8.64  10.00  86.42  1,182,589.60 

339 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5026+100.00  4.32  8.64  0.00  0.00  1,182,589.60 


5026+120.00  4.32  8.64  10.00  86.42  1,182,503.18 
5026+140.00  4.32  8.64  10.00  86.42  1,182,416.76 
5026+160.00  4.32  8.64  10.00  86.42  1,182,330.34 
5026+180.00  4.32  8.64  10.00  86.42  1,182,243.92 
5026+200.00  4.32  8.64  10.00  86.42  1,182,157.50 
5026+220.00  4.32  8.64  10.00  86.42  1,182,071.08 
5026+240.00  4.32  8.64  10.00  86.42  1,181,984.66 
5026+260.00  4.32  8.64  10.00  86.42  1,181,898.24 
5026+280.00  4.32  8.64  10.00  86.42  1,181,811.82 
5026+300.00  4.32  8.64  10.00  86.42  1,181,725.40 
5026+320.00  4.32  8.64  10.00  86.42  1,181,638.98 
5026+340.00  4.32  8.64  10.00  86.42  1,181,552.56 
5026+360.00  4.32  8.64  10.00  86.42  1,181,466.14 
5026+380.00  4.32  8.64  10.00  86.42  1,181,379.72 
5026+400.00  4.32  8.64  10.00  86.42  1,181,293.30 
5026+420.00  4.32  8.64  10.00  86.42  1,181,206.88 
5026+440.00  4.32  8.64  10.00  86.42  1,181,120.46 
5026+460.00  4.32  8.64  10.00  86.42  1,181,034.04 
5026+480.00  4.32  8.64  10.00  86.42  1,180,947.62 
5026+500.00  4.32  8.64  10.00  86.42  1,180,861.20 
5026+520.00  4.32  8.64  10.00  86.42  1,180,774.78 
5026+540.00  4.32  8.64  10.00  86.42  1,180,688.36 
5026+560.00  4.32  8.64  10.00  86.42  1,180,601.94 
5026+580.00  4.32  8.64  10.00  86.42  1,180,515.52 
5026+600.00  4.32  8.64  10.00  86.42  1,180,429.10 
5026+620.00  4.32  8.64  10.00  86.42  1,180,342.68 
5026+623.09  4.32  8.64  1.54  13.33  1,180,329.34 
5026+640.00  4.32  8.64  8.46  73.09  1,180,256.26 
5026+660.00  4.32  8.64  10.00  86.42  1,180,169.84 
5026+680.00  4.32  8.64  10.00  86.42  1,180,083.42 
5026+683.09  4.32  8.64  1.54  13.33  1,180,070.08 
5026+700.00  4.32  8.64  8.46  73.09  1,179,997.00 
5026+720.00  4.32  8.64  10.00  86.42  1,179,910.58 
5026+740.00  4.32  8.64  10.00  86.42  1,179,824.16 
5026+760.00  4.32  8.64  10.00  86.42  1,179,737.74 
5026+771.35  4.32  8.64  5.68  49.05  1,179,688.69 
5026+780.00  4.32  8.64  4.32  37.37  1,179,651.32 
5026+800.00  4.32  8.64  10.00  86.42  1,179,564.90 
5026+820.00  4.32  8.64  10.00  86.42  1,179,478.48 
5026+831.35  4.32  8.64  5.68  49.05  1,179,429.43 
5026+840.00  4.32  8.64  4.32  37.37  1,179,392.06 
5026+860.00  4.32  8.64  10.00  86.42  1,179,305.64 
5026+880.00  4.32  8.64  10.00  86.42  1,179,219.22 
5026+900.00  4.32  8.64  10.00  86.42  1,179,132.80 

340 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5026+920.00  4.32  8.64  10.00  86.42  1,179,046.38 


5026+940.00  4.32  8.64  10.00  86.42  1,178,959.96 
5026+960.00  4.32  8.64  10.00  86.42  1,178,873.54 
5026+980.00  4.32  8.64  10.00  86.42  1,178,787.12 
5027+000.00  4.32  8.64  10.00  86.42  1,178,700.70 
5027+020.00  4.32  8.64  10.00  86.42  1,178,614.28 
5027+020.00  4.32  8.64  0.00  0.00  1,178,614.28 
5027+040.00  4.32  8.64  10.00  86.42  1,178,527.86 
5027+060.00  4.32  8.64  10.00  86.42  1,178,441.44 
5027+080.00  4.32  8.64  10.00  86.42  1,178,355.02 
5027+100.00  4.32  8.64  10.00  86.42  1,178,268.60 
5027+120.00  4.32  8.64  10.00  86.42  1,178,182.18 
5027+140.00  4.32  8.64  10.00  86.42  1,178,095.76 
5027+160.00  4.32  8.64  10.00  86.42  1,178,009.34 
5027+180.00  4.32  8.64  10.00  86.42  1,177,922.92 
5027+200.00  4.32  8.64  10.00  86.42  1,177,836.50 
5027+220.00  4.32  8.64  10.00  86.42  1,177,750.08 
5027+240.00  4.32  8.64  10.00  86.42  1,177,663.66 
5027+260.00  4.32  8.64  10.00  86.42  1,177,577.24 
5027+280.00  4.32  8.64  10.00  86.42  1,177,490.82 
5027+300.00  4.32  8.64  10.00  86.42  1,177,404.40 
5027+320.00  4.32  8.64  10.00  86.42  1,177,317.98 
5027+340.00  4.32  8.64  10.00  86.42  1,177,231.56 
5027+360.00  4.32  8.64  10.00  86.42  1,177,145.14 
5027+380.00  4.32  8.64  10.00  86.42  1,177,058.72 
5027+400.00  4.32  8.64  10.00  86.42  1,176,972.30 
5027+420.00  4.32  8.64  10.00  86.42  1,176,885.88 
5027+440.00  4.32  8.64  10.00  86.42  1,176,799.46 
5027+460.00  4.32  8.64  10.00  86.42  1,176,713.04 
5027+480.00  4.32  8.64  10.00  86.42  1,176,626.62 
5027+500.00  4.32  8.64  10.00  86.42  1,176,540.20 
5027+520.00  4.32  8.64  10.00  86.42  1,176,453.78 
5027+540.00  4.32  8.64  10.00  86.42  1,176,367.36 
5027+560.00  4.32  8.64  10.00  86.42  1,176,280.94 
5027+580.00  4.32  8.64  10.00  86.42  1,176,194.52 
5027+600.00  4.32  8.64  10.00  86.42  1,176,108.10 
5027+620.00  4.32  8.64  10.00  86.42  1,176,021.68 
5027+640.00  4.32  8.64  10.00  86.42  1,175,935.26 
5027+660.00  4.32  8.64  10.00  86.42  1,175,848.84 
5027+680.00  4.32  8.64  10.00  86.42  1,175,762.42 
5027+700.00  4.32  8.64  10.00  86.42  1,175,676.00 
5027+720.00  4.32  8.64  10.00  86.42  1,175,589.58 
5027+740.00  4.32  8.64  10.00  86.42  1,175,503.16 
5027+750.00  4.32  8.64  5.00  43.21  1,175,459.95 
5027+750.00  4.32  8.64  0.00  0.00  1,175,459.95 

341 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5027+760.00  4.32  8.64  5.00  43.21  1,175,416.74 


5027+780.00  4.32  8.64  10.00  86.42  1,175,330.32 
5027+800.00  4.32  8.64  10.00  86.42  1,175,243.90 
5027+820.00  4.32  8.64  10.00  86.42  1,175,157.48 
5027+840.00  4.32  8.64  10.00  86.42  1,175,071.06 
5027+860.00  4.32  8.64  10.00  86.42  1,174,984.64 
5027+880.00  4.32  8.64  10.00  86.42  1,174,898.22 
5027+900.00  4.32  8.64  10.00  86.42  1,174,811.80 
5027+920.00  4.32  8.64  10.00  86.42  1,174,725.38 
5027+940.00  4.32  8.64  10.00  86.42  1,174,638.96 
5027+960.00  4.32  8.64  10.00  86.42  1,174,552.54 
5027+980.00  4.32  8.64  10.00  86.42  1,174,466.12 
5028+000.00  4.32  8.64  10.00  86.42  1,174,379.70 
5028+020.00  4.32  8.64  10.00  86.42  1,174,293.28 
5028+040.00  4.32  8.64  10.00  86.42  1,174,206.86 
5028+060.00  4.32  8.64  10.00  86.42  1,174,120.44 
5028+080.00  4.32  8.64  10.00  86.42  1,174,034.02 
5028+100.00  4.32  8.64  10.00  86.42  1,173,947.60 
5028+120.00  4.32  8.64  10.00  86.42  1,173,861.18 
5028+140.00  4.32  8.64  10.00  86.42  1,173,774.76 
5028+160.00  4.32  8.64  10.00  86.42  1,173,688.34 
5028+180.00  4.32  8.64  10.00  86.42  1,173,601.92 
5028+200.00  4.32  8.64  10.00  86.42  1,173,515.50 
5028+220.00  4.32  8.64  10.00  86.42  1,173,429.08 
5028+240.00  4.32  8.64  10.00  86.42  1,173,342.66 
5028+260.00  4.32  8.64  10.00  86.42  1,173,256.24 
5028+280.00  4.32  8.64  10.00  86.42  1,173,169.82 
5028+300.00  4.32  8.64  10.00  86.42  1,173,083.40 
5028+320.00  4.32  8.64  10.00  86.42  1,172,996.98 
5028+340.00  4.32  8.64  10.00  86.42  1,172,910.56 
5028+360.00  4.32  8.64  10.00  86.42  1,172,824.14 
5028+380.00  4.32  8.64  10.00  86.42  1,172,737.72 
5028+400.00  4.32  8.64  10.00  86.42  1,172,651.30 
5028+420.00  4.32  8.64  10.00  86.42  1,172,564.88 
5028+440.00  4.32  8.64  10.00  86.42  1,172,478.46 
5028+460.00  4.32  8.64  10.00  86.42  1,172,392.04 
5028+480.00  4.32  8.64  10.00  86.42  1,172,305.62 
5028+490.00  4.32  8.64  5.00  43.21  1,172,262.41 
5028+490.00  4.32  8.64  0.00  0.00  1,172,262.41 
5028+500.00  4.32  8.64  5.00  43.21  1,172,219.20 
5028+520.00  4.32  8.64  10.00  86.42  1,172,132.78 
5028+540.00  4.32  8.64  10.00  86.42  1,172,046.36 
5028+560.00  4.32  8.64  10.00  86.42  1,171,959.94 
5028+580.00  4.32  8.64  10.00  86.42  1,171,873.52 
5028+600.00  4.32  8.64  10.00  86.42  1,171,787.10 

342 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5028+620.00  4.32  8.64  10.00  86.42  1,171,700.68 


5028+640.00  4.32  8.64  10.00  86.42  1,171,614.26 
5028+660.00  4.32  8.64  10.00  86.42  1,171,527.84 
5028+680.00  4.32  8.64  10.00  86.42  1,171,441.42 
5028+700.00  4.32  8.64  10.00  86.42  1,171,355.00 
5028+720.00  4.32  8.64  10.00  86.42  1,171,268.58 
5028+740.00  4.32  8.64  10.00  86.42  1,171,182.16 
5028+760.00  4.32  8.64  10.00  86.42  1,171,095.74 
5028+780.00  4.32  8.64  10.00  86.42  1,171,009.32 
5028+800.00  4.32  8.64  10.00  86.42  1,170,922.90 
5028+820.00  4.32  8.64  10.00  86.42  1,170,836.48 
5028+840.00  4.32  8.64  10.00  86.42  1,170,750.06 
5028+860.00  4.32  8.64  10.00  86.42  1,170,663.64 
5028+880.00  4.32  8.64  10.00  86.42  1,170,577.22 
5028+900.00  4.32  8.64  10.00  86.42  1,170,490.80 
5028+920.00  4.32  8.64  10.00  86.42  1,170,404.38 
5028+920.00  4.32  8.64  0.00  0.00  1,170,404.38 
5028+940.00  4.32  8.64  10.00  86.42  1,170,317.96 
5028+960.00  4.32  8.64  10.00  86.42  1,170,231.54 
5028+980.00  4.32  8.64  10.00  86.42  1,170,145.12 
5029+000.00  4.32  8.64  10.00  86.42  1,170,058.70 
5029+020.00  4.32  8.64  10.00  86.42  1,169,972.28 
5029+040.00  4.32  8.64  10.00  86.42  1,169,885.86 
5029+060.00  4.32  8.64  10.00  86.42  1,169,799.44 
5029+080.00  4.32  8.64  10.00  86.42  1,169,713.02 
5029+100.00  4.32  8.64  10.00  86.42  1,169,626.60 
5029+120.00  4.32  8.64  10.00  86.42  1,169,540.18 
5029+140.00  4.32  8.64  10.00  86.42  1,169,453.76 
5029+160.00  4.32  8.64  10.00  86.42  1,169,367.34 
5029+180.00  4.32  8.64  10.00  86.42  1,169,280.92 
5029+200.00  4.32  8.64  10.00  86.42  1,169,194.50 
5029+220.00  4.32  8.64  10.00  86.42  1,169,108.08 
5029+240.00  4.32  8.64  10.00  86.42  1,169,021.66 
5029+260.00  4.32  8.64  10.00  86.42  1,168,935.24 
5029+280.00  4.32  8.64  10.00  86.42  1,168,848.82 
5029+285.11  4.32  8.64  2.56  22.08  1,168,826.73 
5029+300.00  4.32  8.64  7.44  64.34  1,168,762.40 
5029+320.00  4.32  8.64  10.00  86.42  1,168,675.98 
5029+340.00  4.32  8.64  10.00  86.42  1,168,589.56 
5029+360.00  4.32  8.64  10.00  86.42  1,168,503.14 
5029+380.00  4.32  8.64  10.00  86.43  1,168,416.71 
5029+400.00  4.32  8.64  10.00  86.43  1,168,330.28 
5029+420.00  4.32  8.64  10.00  86.42  1,168,243.86 
5029+435.11  4.32  8.64  7.56  65.29  1,168,178.56 
5029+440.00  4.32  8.64  2.44  21.13  1,168,157.44 

343 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5029+440.00  4.32  8.64  0.00  0.00  1,168,157.44 


5029+460.00  4.32  8.64  10.00  86.42  1,168,071.02 
5029+480.00  4.32  8.64  10.00  86.42  1,167,984.60 
5029+500.00  4.32  8.64  10.00  86.42  1,167,898.18 
5029+520.00  4.32  8.64  10.00  86.42  1,167,811.76 
5029+540.00  4.32  8.64  10.00  86.42  1,167,725.34 
5029+560.00  4.32  8.64  10.00  86.42  1,167,638.92 
5029+580.00  4.32  8.64  10.00  86.42  1,167,552.50 
5029+600.00  4.32  8.64  10.00  86.42  1,167,466.08 
5029+620.00  4.32  8.64  10.00  86.42  1,167,379.66 
5029+640.00  4.32  8.64  10.00  86.42  1,167,293.24 
5029+660.00  4.32  8.64  10.00  86.42  1,167,206.82 
5029+680.00  4.32  8.64  10.00  86.42  1,167,120.40 
5029+700.00  4.32  8.64  10.00  86.42  1,167,033.98 
5029+720.00  4.32  8.64  10.00  86.42  1,166,947.56 
5029+740.00  4.32  8.64  10.00  86.42  1,166,861.14 
5029+740.00  4.32  8.64  0.00  0.00  1,166,861.14 
5029+740.36  4.32  8.64  0.18  1.56  1,166,859.57 
5029+760.00  4.32  8.64  9.82  84.86  1,166,774.72 
5029+780.00  4.32  8.64  10.00  86.42  1,166,688.30 
5029+800.00  4.32  8.64  10.00  86.42  1,166,601.88 
5029+820.00  4.32  8.64  10.00  86.42  1,166,515.46 
5029+840.00  4.32  8.64  10.00  86.42  1,166,429.04 
5029+860.00  4.32  8.64  10.00  86.42  1,166,342.62 
5029+880.00  4.32  8.64  10.00  86.42  1,166,256.20 
5029+890.36  4.32  8.64  5.18  44.78  1,166,211.42 
5029+900.00  4.32  8.64  4.82  41.64  1,166,169.78 
5029+920.00  4.32  8.64  10.00  86.42  1,166,083.36 
5029+940.00  4.32  8.64  10.00  86.42  1,165,996.94 
5029+960.00  4.32  8.64  10.00  86.42  1,165,910.52 
5029+980.00  4.32  8.64  10.00  86.42  1,165,824.10 
5030+000.00  4.32  8.64  10.00  86.42  1,165,737.68 
5030+020.00  4.32  8.64  10.00  86.42  1,165,651.26 
5030+040.00  4.32  8.64  10.00  86.42  1,165,564.84 
5030+060.00  4.32  8.64  10.00  86.42  1,165,478.42 
5030+065.00  4.32  8.64  2.50  21.61  1,165,456.81 
5030+065.00  4.32  8.64  0.00  0.00  1,165,456.81 
5030+080.00  4.32  8.64  7.50  64.82  1,165,392.00 
5030+100.00  4.32  8.64  10.00  86.42  1,165,305.58 
5030+120.00  4.32  8.64  10.00  86.42  1,165,219.16 
5030+140.00  4.32  8.64  10.00  86.42  1,165,132.74 
5030+160.00  4.32  8.64  10.00  86.42  1,165,046.32 
5030+180.00  4.32  8.64  10.00  86.42  1,164,959.90 
5030+200.00  4.32  8.64  10.00  86.42  1,164,873.48 
5030+220.00  4.32  8.64  10.00  86.42  1,164,787.06 

344 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5030+240.00  4.32  8.64  10.00  86.42  1,164,700.64 


5030+260.00  4.32  8.64  10.00  86.42  1,164,614.22 
5030+280.00  4.32  8.64  10.00  86.42  1,164,527.80 
5030+300.00  4.32  8.64  10.00  86.42  1,164,441.38 
5030+320.00  4.32  8.64  10.00  86.42  1,164,354.96 
5030+340.00  4.32  8.64  10.00  86.42  1,164,268.54 
5030+360.00  4.32  8.64  10.00  86.42  1,164,182.12 
5030+380.00  4.32  8.64  10.00  86.42  1,164,095.70 
5030+400.00  4.32  8.64  10.00  86.42  1,164,009.28 
5030+420.00  4.32  8.64  10.00  86.42  1,163,922.86 
5030+440.00  4.32  8.64  10.00  86.42  1,163,836.44 
5030+460.00  4.32  8.64  10.00  86.42  1,163,750.02 
5030+480.00  4.32  8.64  10.00  86.42  1,163,663.60 
5030+500.00  4.32  8.64  10.00  86.42  1,163,577.18 
5030+520.00  4.32  8.64  10.00  86.42  1,163,490.76 
5030+540.00  4.32  8.64  10.00  86.42  1,163,404.34 
5030+560.00  4.32  8.64  10.00  86.42  1,163,317.92 
5030+580.00  4.32  8.64  10.00  86.42  1,163,231.50 
5030+600.00  4.32  8.64  10.00  86.42  1,163,145.08 
5030+620.00  4.32  8.64  10.00  86.42  1,163,058.66 
5030+640.00  4.32  8.64  10.00  86.42  1,162,972.24 
5030+660.00  4.32  8.64  10.00  86.42  1,162,885.82 
5030+680.00  4.32  8.64  10.00  86.42  1,162,799.40 
5030+700.00  4.32  8.64  10.00  86.42  1,162,712.98 
5030+713.58  4.32  8.64  6.79  58.68  1,162,654.30 
5030+720.00  4.32  8.64  3.21  27.74  1,162,626.56 
5030+740.00  4.32  8.64  10.00  86.42  1,162,540.14 
5030+743.58  4.32  8.64  1.79  15.47  1,162,524.67 
5030+760.00  4.32  8.64  8.21  70.95  1,162,453.72 
5030+780.00  4.32  8.64  10.00  86.42  1,162,367.30 
5030+800.00  4.32  8.64  10.00  86.42  1,162,280.88 
5030+820.00  4.32  8.64  10.00  86.42  1,162,194.46 
5030+831.05  4.32  8.64  5.52  47.74  1,162,146.71 
5030+840.00  4.32  8.64  4.48  38.68  1,162,108.04 
5030+860.00  4.32  8.64  10.00  86.42  1,162,021.62 
5030+861.05  4.32  8.64  0.52  4.53  1,162,017.08 
5030+880.00  4.32  8.64  9.48  81.89  1,161,935.20 
5030+900.00  4.32  8.64  10.00  86.42  1,161,848.78 
5030+920.00  4.32  8.64  10.00  86.42  1,161,762.36 
5030+940.00  4.32  8.64  10.00  86.42  1,161,675.94 
5030+940.00  4.32  8.64  0.00  0.00  1,161,675.94 
5030+960.00  4.32  8.64  10.00  86.42  1,161,589.52 
5030+980.00  4.32  8.64  10.00  86.42  1,161,503.10 
5031+000.00  4.32  8.64  10.00  86.42  1,161,416.68 
5031+020.00  4.32  8.64  10.00  86.42  1,161,330.26 

345 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5031+040.00  4.32  8.64  10.00  86.42  1,161,243.84 


5031+060.00  4.32  8.64  10.00  86.42  1,161,157.42 
5031+080.00  4.32  8.64  10.00  86.42  1,161,071.00 
5031+100.00  4.32  8.64  10.00  86.42  1,160,984.58 
5031+120.00  4.32  8.64  10.00  86.42  1,160,898.16 
5031+140.00  4.32  8.64  10.00  86.42  1,160,811.74 
5031+160.00  4.32  8.64  10.00  86.42  1,160,725.32 
5031+180.00  4.32  8.64  10.00  86.42  1,160,638.90 
5031+200.00  4.32  8.64  10.00  86.42  1,160,552.48 
5031+220.00  4.32  8.64  10.00  86.42  1,160,466.06 
5031+240.00  4.32  8.64  10.00  86.42  1,160,379.64 
5031+260.00  4.32  8.64  10.00  86.42  1,160,293.22 
5031+280.00  4.32  8.64  10.00  86.42  1,160,206.80 
5031+300.00  4.32  8.64  10.00  86.42  1,160,120.38 
5031+320.00  4.32  8.64  10.00  86.42  1,160,033.96 
5031+340.00  4.32  8.64  10.00  86.42  1,159,947.54 
5031+360.00  4.32  8.64  10.00  86.42  1,159,861.12 
5031+380.00  4.32  8.64  10.00  86.42  1,159,774.70 
5031+400.00  4.32  8.64  10.00  86.42  1,159,688.28 
5031+420.00  4.32  8.64  10.00  86.42  1,159,601.86 
5031+440.00  4.32  8.64  10.00  86.42  1,159,515.44 
5031+460.00  4.32  8.64  10.00  86.42  1,159,429.02 
5031+480.00  4.32  8.64  10.00  86.42  1,159,342.60 
5031+500.00  4.32  8.64  10.00  86.42  1,159,256.18 
5031+520.00  4.32  8.64  10.00  86.42  1,159,169.76 
5031+540.00  4.32  8.64  10.00  86.42  1,159,083.34 
5031+560.00  4.32  8.64  10.00  86.42  1,158,996.92 
5031+580.00  4.32  8.64  10.00  86.42  1,158,910.50 
5031+600.00  4.32  8.64  10.00  86.42  1,158,824.08 
5031+620.00  4.32  8.64  10.00  86.42  1,158,737.66 
5031+640.00  4.32  8.64  10.00  86.42  1,158,651.24 
5031+660.00  4.32  8.64  10.00  86.42  1,158,564.82 
5031+680.00  4.32  8.64  10.00  86.42  1,158,478.40 
5031+700.00  4.32  8.64  10.00  86.42  1,158,391.98 
5031+720.00  4.32  8.64  10.00  86.42  1,158,305.56 
5031+740.00  4.32  8.64  10.00  86.42  1,158,219.14 
5031+760.00  4.32  8.64  10.00  86.42  1,158,132.72 
5031+780.00  4.32  8.64  10.00  86.42  1,158,046.30 
5031+800.00  4.32  8.64  10.00  86.42  1,157,959.88 
5031+820.00  4.32  8.64  10.00  86.42  1,157,873.46 
5031+840.00  4.32  8.64  10.00  86.42  1,157,787.04 
5031+860.00  4.32  8.64  10.00  86.42  1,157,700.62 
5031+880.00  4.32  8.64  10.00  86.42  1,157,614.20 
5031+900.00  4.32  8.64  10.00  86.42  1,157,527.78 
5031+920.00  4.32  8.64  10.00  86.42  1,157,441.36 

346 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5031+940.00  4.32  8.64  10.00  86.42  1,157,354.94 


5031+960.00  4.32  8.64  10.00  86.42  1,157,268.52 
5031+980.00  4.32  8.64  10.00  86.42  1,157,182.10 
5032+000.00  4.32  8.64  10.00  86.42  1,157,095.68 
5032+020.00  4.32  8.64  10.00  86.42  1,157,009.26 
5032+040.00  4.32  8.64  10.00  86.42  1,156,922.84 
5032+060.00  4.32  8.64  10.00  86.42  1,156,836.42 
5032+080.00  4.32  8.64  10.00  86.42  1,156,750.00 
5032+100.00  4.32  8.64  10.00  86.42  1,156,663.58 
5032+120.00  4.32  8.64  10.00  86.42  1,156,577.16 
5032+140.00  4.32  8.64  10.00  86.42  1,156,490.74 
5032+160.00  4.32  8.64  10.00  86.42  1,156,404.32 
5032+180.00  4.32  8.64  10.00  86.42  1,156,317.90 
5032+200.00  4.32  8.64  10.00  86.42  1,156,231.48 
5032+220.00  4.32  8.64  10.00  86.42  1,156,145.06 
5032+240.00  4.32  8.64  10.00  86.42  1,156,058.64 
5032+260.00  4.32  8.64  10.00  86.42  1,155,972.22 
5032+280.00  4.32  8.64  10.00  86.42  1,155,885.80 
5032+300.00  4.32  8.64  10.00  86.42  1,155,799.38 
5032+320.00  4.32  8.64  10.00  86.42  1,155,712.96 
5032+340.00  4.32  8.64  10.00  86.42  1,155,626.54 
5032+360.00  4.32  8.64  10.00  86.42  1,155,540.12 
5032+380.00  4.32  8.64  10.00  86.42  1,155,453.70 
5032+400.00  4.32  8.64  10.00  86.42  1,155,367.28 
5032+420.00  4.32  8.64  10.00  86.42  1,155,280.86 
5032+440.00  4.32  8.64  10.00  86.42  1,155,194.44 
5032+460.00  4.32  8.64  10.00  86.42  1,155,108.02 
5032+480.00  4.32  8.64  10.00  86.42  1,155,021.60 
5032+500.00  4.32  8.64  10.00  86.42  1,154,935.18 
5032+520.00  4.32  8.64  10.00  86.42  1,154,848.76 
5032+540.00  4.32  8.64  10.00  86.42  1,154,762.34 
5032+560.00  4.32  8.64  10.00  86.42  1,154,675.92 
5032+580.00  4.32  8.64  10.00  86.42  1,154,589.50 
5032+600.00  4.32  8.64  10.00  86.42  1,154,503.08 
5032+620.00  4.32  8.64  10.00  86.42  1,154,416.66 
5032+640.00  4.32  8.64  10.00  86.42  1,154,330.24 
5032+660.00  4.32  8.64  10.00  86.42  1,154,243.82 
5032+680.00  4.32  8.64  10.00  86.42  1,154,157.40 
5032+700.00  4.32  8.64  10.00  86.42  1,154,070.98 
5032+720.00  4.32  8.64  10.00  86.42  1,153,984.56 
5032+740.00  4.32  8.64  10.00  86.42  1,153,898.14 
5032+760.00  4.32  8.64  10.00  86.42  1,153,811.72 
5032+780.00  4.32  8.64  10.00  86.42  1,153,725.30 
5032+800.00  4.32  8.64  10.00  86.42  1,153,638.88 
5032+820.00  4.32  8.64  10.00  86.42  1,153,552.46 

347 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5032+840.00  4.32  8.64  10.00  86.42  1,153,466.04 


5032+860.00  4.32  8.64  10.00  86.42  1,153,379.62 
5032+880.00  4.32  8.64  10.00  86.42  1,153,293.20 
5032+900.00  4.32  8.64  10.00  86.42  1,153,206.78 
5032+920.00  4.32  8.64  10.00  86.42  1,153,120.36 
5032+940.00  4.32  8.64  10.00  86.42  1,153,033.94 
5032+960.00  4.32  8.64  10.00  86.42  1,152,947.52 
5032+980.00  4.32  8.64  10.00  86.42  1,152,861.10 
5033+000.00  4.32  8.64  10.00  86.42  1,152,774.68 
5033+020.00  4.32  8.64  10.00  86.42  1,152,688.26 
5033+040.00  4.32  8.64  10.00  86.42  1,152,601.84 
5033+060.00  4.32  8.64  10.00  86.42  1,152,515.42 
5033+080.00  4.32  8.64  10.00  86.42  1,152,429.00 
5033+100.00  4.32  8.64  10.00  86.42  1,152,342.58 
5033+120.00  4.32  8.64  10.00  86.42  1,152,256.16 
5033+140.00  4.32  8.64  10.00  86.42  1,152,169.74 
5033+160.00  4.32  8.64  10.00  86.42  1,152,083.32 
5033+180.00  4.32  8.64  10.00  86.42  1,151,996.90 
5033+200.00  4.32  8.64  10.00  86.42  1,151,910.48 
5033+220.00  4.32  8.64  10.00  86.42  1,151,824.06 
5033+240.00  4.32  8.64  10.00  86.42  1,151,737.64 
5033+260.00  4.32  8.64  10.00  86.42  1,151,651.22 
5033+280.00  4.32  8.64  10.00  86.42  1,151,564.80 
5033+300.00  4.32  8.64  10.00  86.42  1,151,478.38 
5033+320.00  4.32  8.64  10.00  86.42  1,151,391.96 
5033+340.00  4.32  8.64  10.00  86.42  1,151,305.54 
5033+360.00  4.32  8.64  10.00  86.42  1,151,219.12 
5033+380.00  4.32  8.64  10.00  86.42  1,151,132.70 
5033+400.00  4.32  8.64  10.00  86.42  1,151,046.28 
5033+420.00  4.32  8.64  10.00  86.42  1,150,959.86 
5033+440.00  4.32  8.64  10.00  86.42  1,150,873.44 
5033+460.00  4.32  8.64  10.00  86.42  1,150,787.02 
5033+480.00  4.32  8.64  10.00  86.42  1,150,700.60 
5033+500.00  4.32  8.64  10.00  86.42  1,150,614.18 
5033+520.00  4.32  8.64  10.00  86.42  1,150,527.76 
5033+540.00  4.32  8.64  10.00  86.42  1,150,441.34 
5033+560.00  4.32  8.64  10.00  86.42  1,150,354.92 
5033+580.00  4.32  8.64  10.00  86.42  1,150,268.50 
5033+600.00  4.32  8.64  10.00  86.42  1,150,182.08 
5033+620.00  4.32  8.64  10.00  86.42  1,150,095.66 
5033+640.00  4.32  8.64  10.00  86.42  1,150,009.24 
5033+660.00  4.32  8.64  10.00  86.42  1,149,922.82 
5033+680.00  4.32  8.64  10.00  86.42  1,149,836.40 
5033+700.00  4.32  8.64  10.00  86.42  1,149,749.98 
5033+720.00  4.32  8.64  10.00  86.42  1,149,663.56 

348 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5033+740.00  4.32  8.64  10.00  86.42  1,149,577.14 


5033+750.00  4.32  8.64  5.00  43.21  1,149,533.93 
5033+760.00  4.32  8.64  5.00  43.21  1,149,490.72 
5033+763.47  4.32  8.64  1.74  15.01  1,149,475.71 
5033+780.00  4.32  8.64  8.26  71.41  1,149,404.30 
5033+793.47  4.32  8.64  6.74  58.22  1,149,346.08 
5033+800.00  4.32  8.64  3.26  28.20  1,149,317.88 
5033+820.00  4.32  8.64  10.00  86.42  1,149,231.46 
5033+840.00  4.32  8.64  10.00  86.42  1,149,145.04 
5033+860.00  4.32  8.64  10.00  86.42  1,149,058.62 
5033+877.83  4.32  8.64  8.92  77.05  1,148,981.57 
5033+880.00  4.32  8.64  1.08  9.37  1,148,972.20 
5033+900.00  4.32  8.64  10.00  86.42  1,148,885.78 
5033+907.83  4.32  8.64  3.92  33.84  1,148,851.94 
5033+920.00  4.32  8.64  6.08  52.58  1,148,799.36 
5033+940.00  4.32  8.64  10.00  86.42  1,148,712.94 
5033+960.00  4.32  8.64  10.00  86.42  1,148,626.52 
5033+980.00  4.32  8.64  10.00  86.42  1,148,540.10 
5034+000.00  4.32  8.64  10.00  86.42  1,148,453.68 
5034+020.00  4.32  8.64  10.00  86.42  1,148,367.26 
5034+040.00  4.32  8.64  10.00  86.42  1,148,280.84 
5034+060.00  4.32  8.64  10.00  86.42  1,148,194.42 
5034+080.00  4.32  8.64  10.00  86.42  1,148,108.00 
5034+100.00  4.32  8.64  10.00  86.42  1,148,021.58 
5034+120.00  4.32  8.64  10.00  86.42  1,147,935.16 
5034+140.00  4.32  8.64  10.00  86.42  1,147,848.74 
5034+160.00  4.32  8.64  10.00  86.42  1,147,762.32 
5034+180.00  4.32  8.64  10.00  86.42  1,147,675.90 
5034+200.00  4.32  8.64  10.00  86.42  1,147,589.48 
5034+200.00  4.32  8.64  0.00  0.00  1,147,589.48 
5034+220.00  4.32  8.64  10.00  86.42  1,147,503.06 
5034+240.00  4.32  8.64  10.00  86.42  1,147,416.64 
5034+260.00  4.32  8.64  10.00  86.42  1,147,330.22 
5034+280.00  4.32  8.64  10.00  86.42  1,147,243.80 
5034+290.00  4.32  8.64  5.00  43.21  1,147,200.59 
5034+290.00  4.32  8.64  0.00  0.00  1,147,200.59 
5034+300.00  4.32  8.64  5.00  43.21  1,147,157.38 
5034+320.00  4.32  8.64  10.00  86.42  1,147,070.96 
5034+340.00  4.32  8.64  10.00  86.42  1,146,984.54 
5034+360.00  4.32  8.64  10.00  86.42  1,146,898.12 
5034+380.00  4.32  8.64  10.00  86.42  1,146,811.70 
5034+400.00  4.32  8.64  10.00  86.42  1,146,725.28 
5034+420.00  4.32  8.64  10.00  86.42  1,146,638.86 
5034+440.00  4.32  8.64  10.00  86.42  1,146,552.44 
5034+450.00  4.32  8.64  5.00  43.21  1,146,509.23 

349 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5034+460.00  4.32  8.64  5.00  43.21  1,146,466.02 


5034+480.00  4.32  8.64  10.00  86.42  1,146,379.60 
5034+500.00  4.32  8.64  10.00  86.42  1,146,293.18 
5034+520.00  4.32  8.64  10.00  86.42  1,146,206.76 
5034+540.00  4.32  8.64  10.00  86.42  1,146,120.34 
5034+560.00  4.32  8.64  10.00  86.42  1,146,033.92 
5034+580.00  4.32  8.64  10.00  86.42  1,145,947.50 
5034+600.00  4.32  8.64  10.00  86.42  1,145,861.08 
5034+620.00  4.32  8.64  10.00  86.42  1,145,774.66 
5034+640.00  4.32  8.64  10.00  86.42  1,145,688.24 
5034+660.00  4.32  8.64  10.00  86.42  1,145,601.82 
5034+680.00  4.32  8.64  10.00  86.42  1,145,515.40 
5034+700.00  4.32  8.64  10.00  86.42  1,145,428.98 
5034+720.00  4.32  8.64  10.00  86.42  1,145,342.56 
5034+740.00  4.32  8.64  10.00  86.42  1,145,256.14 
5034+760.00  4.32  8.64  10.00  86.42  1,145,169.72 
5034+780.00  4.32  8.64  10.00  86.42  1,145,083.30 
5034+800.00  4.32  8.64  10.00  86.42  1,144,996.88 
5034+820.00  4.32  8.64  10.00  86.42  1,144,910.46 
5034+840.00  4.32  8.64  10.00  86.42  1,144,824.04 
5034+860.00  4.32  8.64  10.00  86.42  1,144,737.62 
5034+880.00  4.32  8.64  10.00  86.42  1,144,651.20 
5034+900.00  4.32  8.64  10.00  86.42  1,144,564.78 
5034+920.00  4.32  8.64  10.00  86.42  1,144,478.36 
5034+940.00  4.32  8.64  10.00  86.42  1,144,391.94 
5034+960.00  4.32  8.64  10.00  86.42  1,144,305.52 
5034+980.00  4.32  8.64  10.00  86.42  1,144,219.10 
5035+000.00  4.32  8.64  10.00  86.42  1,144,132.68 
5035+020.00  4.32  8.64  10.00  86.42  1,144,046.26 
5035+028.75  4.32  8.64  4.38  37.83  1,144,008.43 
5035+040.00  4.32  8.64  5.62  48.59  1,143,959.84 
5035+058.75  4.32  8.64  9.38  81.04  1,143,878.80 
5035+060.00  4.32  8.64  0.62  5.38  1,143,873.42 
5035+080.00  4.32  8.64  10.00  86.42  1,143,787.00 
5035+100.00  4.32  8.64  10.00  86.42  1,143,700.58 
5035+100.00  4.32  8.64  0.00  0.00  1,143,700.58 
5035+120.00  4.32  8.64  10.00  86.42  1,143,614.16 
5035+140.00  4.32  8.64  10.00  86.42  1,143,527.74 
5035+143.04  4.32  8.64  1.52  13.15  1,143,514.59 
5035+160.00  4.32  8.64  8.48  73.27  1,143,441.32 
5035+173.04  4.32  8.64  6.52  56.36  1,143,384.96 
5035+180.00  4.32  8.64  3.48  30.06  1,143,354.90 
5035+200.00  4.32  8.64  10.00  86.42  1,143,268.48 
5035+220.00  4.32  8.64  10.00  86.42  1,143,182.06 
5035+240.00  4.32  8.64  10.00  86.42  1,143,095.64 

350 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5035+260.00  4.32  8.64  10.00  86.42  1,143,009.22 


5035+280.00  4.32  8.64  10.00  86.42  1,142,922.80 
5035+300.00  4.32  8.64  10.00  86.42  1,142,836.38 
5035+320.00  4.32  8.64  10.00  86.42  1,142,749.96 
5035+340.00  4.32  8.64  10.00  86.42  1,142,663.54 
5035+360.00  4.32  8.64  10.00  86.42  1,142,577.12 
5035+380.00  4.32  8.64  10.00  86.42  1,142,490.70 
5035+400.00  4.32  8.64  10.00  86.42  1,142,404.28 
5035+420.00  4.32  8.64  10.00  86.42  1,142,317.86 
5035+440.00  4.32  8.64  10.00  86.42  1,142,231.44 
5035+460.00  4.32  8.64  10.00  86.42  1,142,145.02 
5035+480.00  4.32  8.64  10.00  86.42  1,142,058.60 
5035+500.00  4.32  8.64  10.00  86.42  1,141,972.18 
5035+520.00  4.32  8.64  10.00  86.42  1,141,885.76 
5035+540.00  4.32  8.64  10.00  86.42  1,141,799.34 
5035+560.00  4.32  8.64  10.00  86.42  1,141,712.92 
5035+580.00  4.32  8.64  10.00  86.42  1,141,626.50 
5035+600.00  4.32  8.64  10.00  86.42  1,141,540.08 
5035+620.00  4.32  8.64  10.00  86.42  1,141,453.66 
5035+640.00  4.32  8.64  10.00  86.42  1,141,367.24 
5035+660.00  4.32  8.64  10.00  86.42  1,141,280.82 
5035+680.00  4.32  8.64  10.00  86.42  1,141,194.40 
5035+700.00  4.32  8.64  10.00  86.42  1,141,107.98 
5035+720.00  4.32  8.64  10.00  86.42  1,141,021.56 
5035+740.00  4.32  8.64  10.00  86.42  1,140,935.14 
5035+760.00  4.32  8.64  10.00  86.42  1,140,848.72 
5035+780.00  4.32  8.64  10.00  86.42  1,140,762.30 
5035+800.00  4.32  8.64  10.00  86.42  1,140,675.88 
5035+820.00  4.32  8.64  10.00  86.42  1,140,589.46 
5035+840.00  4.32  8.64  10.00  86.42  1,140,503.04 
5035+860.00  4.32  8.64  10.00  86.42  1,140,416.62 
5035+880.00  4.32  8.64  10.00  86.42  1,140,330.20 
5035+900.00  4.32  8.64  10.00  86.42  1,140,243.78 
5035+920.00  4.32  8.64  10.00  86.42  1,140,157.36 
5035+940.00  4.32  8.64  10.00  86.42  1,140,070.94 
5035+960.00  4.32  8.64  10.00  86.42  1,139,984.52 
5035+980.00  4.32  8.64  10.00  86.42  1,139,898.10 
5036+000.00  4.32  8.64  10.00  86.42  1,139,811.68 
5036+000.00  4.32  8.64  0.00  0.00  1,139,811.68 
5036+020.00  4.32  8.64  10.00  86.42  1,139,725.26 
5036+040.00  4.32  8.64  10.00  86.42  1,139,638.84 
5036+060.00  4.32  8.64  10.00  86.42  1,139,552.42 
5036+080.00  4.32  8.64  10.00  86.42  1,139,466.00 
5036+100.00  4.32  8.64  10.00  86.42  1,139,379.58 
5036+120.00  4.32  8.64  10.00  86.42  1,139,293.16 

351 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5036+140.00  4.32  8.64  10.00  86.42  1,139,206.74 


5036+160.00  4.32  8.64  10.00  86.42  1,139,120.32 
5036+180.00  4.32  8.64  10.00  86.42  1,139,033.90 
5036+200.00  4.32  8.64  10.00  86.42  1,138,947.48 
5036+220.00  4.32  8.64  10.00  86.42  1,138,861.06 
5036+240.00  4.32  8.64  10.00  86.42  1,138,774.64 
5036+260.00  4.32  8.64  10.00  86.42  1,138,688.22 
5036+280.00  4.32  8.64  10.00  86.42  1,138,601.80 
5036+300.00  4.32  8.64  10.00  86.42  1,138,515.38 
5036+320.00  4.32  8.64  10.00  86.42  1,138,428.96 
5036+340.00  4.32  8.64  10.00  86.42  1,138,342.54 
5036+360.00  4.32  8.64  10.00  86.42  1,138,256.12 
5036+360.00  4.32  8.64  0.00  0.00  1,138,256.12 
5036+380.00  4.32  8.64  10.00  86.42  1,138,169.70 
5036+400.00  4.32  8.64  10.00  86.42  1,138,083.28 
5036+420.00  4.32  8.64  10.00  86.42  1,137,996.86 
5036+440.00  4.32  8.64  10.00  86.42  1,137,910.44 
5036+460.00  4.32  8.64  10.00  86.42  1,137,824.02 
5036+480.00  4.32  8.64  10.00  86.42  1,137,737.60 
5036+500.00  4.32  8.64  10.00  86.42  1,137,651.18 
5036+500.00  4.32  8.64  0.00  0.00  1,137,651.18 
5036+520.00  4.32  8.64  10.00  86.42  1,137,564.76 
5036+540.00  4.32  8.64  10.00  86.42  1,137,478.34 
5036+560.00  4.32  8.64  10.00  86.42  1,137,391.92 
5036+580.00  4.32  8.64  10.00  86.42  1,137,305.50 
5036+600.00  4.32  8.64  10.00  86.42  1,137,219.08 
5036+620.00  4.32  8.64  10.00  86.42  1,137,132.66 
5036+640.00  4.32  8.64  10.00  86.42  1,137,046.24 
5036+660.00  4.32  8.64  10.00  86.42  1,136,959.82 
5036+680.00  4.32  8.64  10.00  86.42  1,136,873.40 
5036+700.00  4.32  8.64  10.00  86.42  1,136,786.98 
5036+720.00  4.32  8.64  10.00  86.42  1,136,700.56 
5036+740.00  4.32  8.64  10.00  86.42  1,136,614.14 
5036+760.00  4.32  8.64  10.00  86.42  1,136,527.72 
5036+780.00  4.32  8.64  10.00  86.42  1,136,441.30 
5036+800.00  4.32  8.64  10.00  86.42  1,136,354.88 
5036+820.00  4.32  8.64  10.00  86.42  1,136,268.46 
5036+840.00  4.32  8.64  10.00  86.42  1,136,182.04 
5036+860.00  4.32  8.64  10.00  86.42  1,136,095.62 
5036+880.00  4.32  8.64  10.00  86.42  1,136,009.20 
5036+900.00  4.32  8.64  10.00  86.42  1,135,922.78 
5036+920.00  4.32  8.64  10.00  86.42  1,135,836.36 
5036+940.00  4.32  8.64  10.00  86.42  1,135,749.94 
5036+960.00  4.32  8.64  10.00  86.42  1,135,663.52 
5036+980.00  4.32  8.64  10.00  86.42  1,135,577.10 

352 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5037+000.00  4.32  8.64  10.00  86.42  1,135,490.68 


5037+020.00  4.32  8.64  10.00  86.42  1,135,404.26 
5037+040.00  4.32  8.64  10.00  86.42  1,135,317.84 
5037+060.00  4.32  8.64  10.00  86.42  1,135,231.42 
5037+080.00  4.32  8.64  10.00  86.42  1,135,145.00 
5037+100.00  4.32  8.64  10.00  86.42  1,135,058.58 
5037+120.00  4.32  8.64  10.00  86.42  1,134,972.16 
5037+140.00  4.32  8.64  10.00  86.42  1,134,885.74 
5037+160.00  4.32  8.64  10.00  86.42  1,134,799.32 
5037+180.00  4.32  8.64  10.00  86.42  1,134,712.90 
5037+200.00  4.32  8.64  10.00  86.42  1,134,626.48 
5037+220.00  4.32  8.64  10.00  86.42  1,134,540.06 
5037+240.00  4.32  8.64  10.00  86.42  1,134,453.64 
5037+260.00  4.32  8.64  10.00  86.42  1,134,367.22 
5037+280.00  4.32  8.64  10.00  86.42  1,134,280.80 
5037+300.00  4.32  8.64  10.00  86.42  1,134,194.38 
5037+320.00  4.32  8.64  10.00  86.42  1,134,107.96 
5037+340.00  4.32  8.64  10.00  86.42  1,134,021.54 
5037+360.00  4.32  8.64  10.00  86.42  1,133,935.12 
5037+380.00  4.32  8.64  10.00  86.42  1,133,848.70 
5037+400.00  4.32  8.64  10.00  86.42  1,133,762.28 
5037+420.00  4.32  8.64  10.00  86.42  1,133,675.86 
5037+440.00  4.32  8.64  10.00  86.42  1,133,589.44 
5037+460.00  4.32  8.64  10.00  86.42  1,133,503.02 
5037+480.00  4.32  8.64  10.00  86.42  1,133,416.60 
5037+500.00  4.32  8.64  10.00  86.42  1,133,330.18 
5037+520.00  4.32  8.64  10.00  86.42  1,133,243.76 
5037+540.00  4.32  8.64  10.00  86.42  1,133,157.34 
5037+560.00  4.32  8.64  10.00  86.42  1,133,070.92 
5037+580.00  4.32  8.64  10.00  86.42  1,132,984.50 
5037+600.00  4.32  8.64  10.00  86.42  1,132,898.08 
5037+620.00  4.32  8.64  10.00  86.42  1,132,811.66 
5037+640.00  4.32  8.64  10.00  86.42  1,132,725.24 
5037+660.00  4.32  8.64  10.00  86.42  1,132,638.82 
5037+680.00  4.32  8.64  10.00  86.42  1,132,552.40 
5037+700.00  4.32  8.64  10.00  86.42  1,132,465.98 
5037+720.00  4.32  8.64  10.00  86.42  1,132,379.56 
5037+740.00  4.32  8.64  10.00  86.42  1,132,293.14 
5037+760.00  4.32  8.64  10.00  86.42  1,132,206.72 
5037+780.00  4.32  8.64  10.00  86.42  1,132,120.30 
5037+800.00  4.32  8.64  10.00  86.42  1,132,033.88 
5037+820.00  4.32  8.64  10.00  86.42  1,131,947.46 
5037+840.00  4.32  8.64  10.00  86.42  1,131,861.04 
5037+860.00  4.32  8.64  10.00  86.42  1,131,774.62 
5037+880.00  4.32  8.64  10.00  86.42  1,131,688.20 

353 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5037+900.00  4.32  8.64  10.00  86.42  1,131,601.78 


5037+920.00  4.32  8.64  10.00  86.42  1,131,515.36 
5037+940.00  4.32  8.64  10.00  86.42  1,131,428.94 
5037+960.00  4.32  8.64  10.00  86.42  1,131,342.52 
5037+980.00  4.32  8.64  10.00  86.42  1,131,256.10 
5038+000.00  4.32  8.64  10.00  86.42  1,131,169.68 
5038+020.00  4.32  8.64  10.00  86.42  1,131,083.26 
5038+040.00  4.32  8.64  10.00  86.42  1,130,996.84 
5038+060.00  4.32  8.64  10.00  86.42  1,130,910.42 
5038+080.00  4.32  8.64  10.00  86.42  1,130,824.00 
5038+100.00  4.32  8.64  10.00  86.42  1,130,737.58 
5038+120.00  4.32  8.64  10.00  86.42  1,130,651.16 
5038+140.00  4.32  8.64  10.00  86.42  1,130,564.74 
5038+160.00  4.32  8.64  10.00  86.42  1,130,478.32 
5038+180.00  4.32  8.64  10.00  86.42  1,130,391.90 
5038+200.00  4.32  8.64  10.00  86.42  1,130,305.48 
5038+220.00  4.32  8.64  10.00  86.42  1,130,219.06 
5038+240.00  4.32  8.64  10.00  86.42  1,130,132.64 
5038+260.00  4.32  8.64  10.00  86.42  1,130,046.22 
5038+280.00  4.32  8.64  10.00  86.42  1,129,959.80 
5038+300.00  4.32  8.64  10.00  86.42  1,129,873.38 
5038+320.00  4.32  8.64  10.00  86.42  1,129,786.96 
5038+340.00  4.32  8.64  10.00  86.42  1,129,700.54 
5038+360.00  4.32  8.64  10.00  86.42  1,129,614.12 
5038+380.00  4.32  8.64  10.00  86.42  1,129,527.70 
5038+400.00  4.32  8.64  10.00  86.42  1,129,441.28 
5038+420.00  4.32  8.64  10.00  86.42  1,129,354.86 
5038+440.00  4.32  8.64  10.00  86.42  1,129,268.44 
5038+460.00  4.32  8.64  10.00  86.42  1,129,182.02 
5038+480.00  4.32  8.64  10.00  86.42  1,129,095.60 
5038+500.00  4.32  8.64  10.00  86.42  1,129,009.18 
5038+520.00  4.32  8.64  10.00  86.42  1,128,922.76 
5038+540.00  4.32  8.64  10.00  86.42  1,128,836.34 
5038+560.00  4.32  8.64  10.00  86.42  1,128,749.92 
5038+580.00  4.32  8.64  10.00  86.42  1,128,663.50 
5038+600.00  4.32  8.64  10.00  86.42  1,128,577.08 
5038+620.00  4.32  8.64  10.00  86.42  1,128,490.66 
5038+640.00  4.32  8.64  10.00  86.42  1,128,404.24 
5038+660.00  4.32  8.64  10.00  86.42  1,128,317.82 
5038+680.00  4.32  8.64  10.00  86.42  1,128,231.40 
5038+700.00  4.32  8.64  10.00  86.42  1,128,144.98 
5038+720.00  4.32  8.64  10.00  86.42  1,128,058.56 
5038+740.00  4.32  8.64  10.00  86.42  1,127,972.14 
5038+760.00  4.32  8.64  10.00  86.42  1,127,885.72 
5038+780.00  4.32  8.64  10.00  86.42  1,127,799.30 

354 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5038+800.00  4.32  8.64  10.00  86.42  1,127,712.88 


5038+820.00  4.32  8.64  10.00  86.42  1,127,626.46 
5038+840.00  4.32  8.64  10.00  86.42  1,127,540.04 
5038+860.00  4.32  8.64  10.00  86.42  1,127,453.62 
5038+880.00  4.32  8.64  10.00  86.42  1,127,367.20 
5038+900.00  4.32  8.64  10.00  86.42  1,127,280.78 
5038+920.00  4.32  8.64  10.00  86.42  1,127,194.36 
5038+940.00  4.32  8.64  10.00  86.42  1,127,107.94 
5038+960.00  4.32  8.64  10.00  86.42  1,127,021.52 
5038+980.00  4.32  8.64  10.00  86.42  1,126,935.10 
5039+000.00  4.32  8.64  10.00  86.42  1,126,848.68 
5039+020.00  4.32  8.64  10.00  86.42  1,126,762.26 
5039+040.00  4.32  8.64  10.00  86.42  1,126,675.84 
5039+060.00  4.32  8.64  10.00  86.42  1,126,589.42 
5039+080.00  4.32  8.64  10.00  86.42  1,126,503.00 
5039+100.00  4.32  8.64  10.00  86.42  1,126,416.58 
5039+120.00  4.32  8.64  10.00  86.42  1,126,330.16 
5039+140.00  4.32  8.64  10.00  86.42  1,126,243.74 
5039+160.00  4.32  8.64  10.00  86.42  1,126,157.32 
5039+180.00  4.32  8.64  10.00  86.42  1,126,070.90 
5039+200.00  4.32  8.64  10.00  86.42  1,125,984.48 
5039+220.00  4.32  8.64  10.00  86.42  1,125,898.06 
5039+240.00  4.32  8.64  10.00  86.42  1,125,811.64 
5039+260.00  4.32  8.64  10.00  86.42  1,125,725.22 
5039+280.00  4.32  8.64  10.00  86.42  1,125,638.80 
5039+300.00  4.32  8.64  10.00  86.42  1,125,552.38 
5039+301.44  4.32  8.64  0.72  6.22  1,125,546.16 
5039+320.00  4.32  8.64  9.28  80.20  1,125,465.96 
5039+340.00  4.32  8.64  10.00  86.42  1,125,379.54 
5039+351.44  4.32  8.64  5.72  49.43  1,125,330.11 
5039+360.00  4.32  8.64  4.28  36.99  1,125,293.12 
5039+380.00  4.32  8.64  10.00  86.42  1,125,206.70 
5039+400.00  4.32  8.64  10.00  86.42  1,125,120.28 
5039+420.00  4.32  8.64  10.00  86.42  1,125,033.86 
5039+440.00  4.32  8.64  10.00  86.42  1,124,947.44 
5039+441.77  4.32  8.64  0.88  7.63  1,124,939.81 
5039+460.00  4.32  8.64  9.12  78.79  1,124,861.02 
5039+480.00  4.32  8.64  10.00  86.42  1,124,774.60 
5039+491.77  4.32  8.64  5.88  50.84  1,124,723.76 
5039+500.00  4.32  8.64  4.12  35.58  1,124,688.18 
5039+520.00  4.32  8.64  10.00  86.42  1,124,601.76 
5039+540.00  4.32  8.64  10.00  86.42  1,124,515.34 
5039+560.00  4.32  8.64  10.00  86.42  1,124,428.92 
5039+580.00  4.32  8.64  10.00  86.42  1,124,342.50 
5039+600.00  4.32  8.64  10.00  86.42  1,124,256.08 

355 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5039+620.00  4.32  8.64  10.00  86.42  1,124,169.66 


5039+640.00  4.32  8.64  10.00  86.42  1,124,083.24 
5039+660.00  4.32  8.64  10.00  86.42  1,123,996.82 
5039+680.00  4.32  8.64  10.00  86.42  1,123,910.40 
5039+700.00  4.32  8.64  10.00  86.42  1,123,823.98 
5039+720.00  4.32  8.64  10.00  86.42  1,123,737.56 
5039+740.00  4.32  8.64  10.00  86.42  1,123,651.14 
5039+760.00  4.32  8.64  10.00  86.42  1,123,564.72 
5039+780.00  4.32  8.64  10.00  86.42  1,123,478.30 
5039+800.00  4.32  8.64  10.00  86.42  1,123,391.88 
5039+820.00  4.32  8.64  10.00  86.42  1,123,305.46 
5039+840.00  4.32  8.64  10.00  86.42  1,123,219.04 
5039+860.00  4.32  8.64  10.00  86.42  1,123,132.62 
5039+880.00  4.32  8.64  10.00  86.42  1,123,046.20 
5039+900.00  4.32  8.64  10.00  86.42  1,122,959.78 
5039+920.00  4.32  8.64  10.00  86.42  1,122,873.36 
5039+940.00  4.32  8.64  10.00  86.42  1,122,786.94 
5039+960.00  4.32  8.64  10.00  86.42  1,122,700.52 
5039+980.00  4.32  8.64  10.00  86.42  1,122,614.10 
5040+000.00  4.32  8.64  10.00  86.42  1,122,527.68 
5040+020.00  4.32  8.64  10.00  86.42  1,122,441.26 
5040+040.00  4.32  8.64  10.00  86.42  1,122,354.84 
5040+060.00  4.32  8.64  10.00  86.42  1,122,268.42 
5040+080.00  4.32  8.64  10.00  86.42  1,122,182.00 
5040+100.00  4.32  8.64  10.00  86.42  1,122,095.58 
5040+120.00  4.32  8.64  10.00  86.42  1,122,009.16 
5040+140.00  4.32  8.64  10.00  86.42  1,121,922.74 
5040+160.00  4.32  8.64  10.00  86.42  1,121,836.32 
5040+180.00  4.32  8.64  10.00  86.42  1,121,749.90 
5040+200.00  4.32  8.64  10.00  86.42  1,121,663.48 
5040+220.00  4.32  8.64  10.00  86.42  1,121,577.06 
5040+240.00  4.32  8.64  10.00  86.42  1,121,490.64 
5040+260.00  4.32  8.64  10.00  86.42  1,121,404.22 
5040+280.00  4.32  8.64  10.00  86.42  1,121,317.80 
5040+300.00  4.32  8.64  10.00  86.42  1,121,231.38 
5040+320.00  4.32  8.64  10.00  86.42  1,121,144.96 
5040+340.00  4.32  8.64  10.00  86.42  1,121,058.54 
5040+360.00  4.32  8.64  10.00  86.42  1,120,972.12 
5040+380.00  4.32  8.64  10.00  86.42  1,120,885.70 
5040+400.00  4.32  8.64  10.00  86.42  1,120,799.28 
5040+420.00  4.32  8.64  10.00  86.42  1,120,712.86 
5040+440.00  4.32  8.64  10.00  86.42  1,120,626.44 
5040+460.00  4.32  8.64  10.00  86.42  1,120,540.02 
5040+480.00  4.32  8.64  10.00  86.42  1,120,453.60 
5040+500.00  4.32  8.64  10.00  86.42  1,120,367.18 

356 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5040+520.00  4.32  8.64  10.00  86.42  1,120,280.76 


5040+540.00  4.32  8.64  10.00  86.42  1,120,194.34 
5040+540.00  4.32  8.64  0.00  0.00  1,120,194.34 
5040+540.00  0.00  4.32  0.00  0.00  1,120,194.34 
5040+560.00  0.00  0.00  10.00  0.00  1,120,194.34 
5040+571.00  0.00  0.00  5.50  0.00  1,120,194.34 
5040+571.00  0.00  0.00  0.00  0.00  1,120,194.34 
5040+571.00  4.32  4.32  0.00  0.00  1,120,194.33 
5040+580.00  4.32  8.64  4.50  38.88  1,120,155.45 
5040+600.00  4.32  8.64  10.00  86.42  1,120,069.03 
5040+620.00  4.32  8.64  10.00  86.42  1,119,982.61 
5040+640.00  4.32  8.64  10.00  86.42  1,119,896.19 
5040+660.00  4.32  8.64  10.00  86.42  1,119,809.77 
5040+680.00  4.32  8.64  10.00  86.42  1,119,723.35 
5040+700.00  4.32  8.64  10.00  86.42  1,119,636.93 
5040+720.00  4.32  8.64  10.00  86.42  1,119,550.51 
5040+740.00  4.32  8.64  10.00  86.42  1,119,464.09 
5040+760.00  4.32  8.64  10.00  86.42  1,119,377.67 
5040+780.00  4.32  8.64  10.00  86.42  1,119,291.25 
5040+800.00  4.32  8.64  10.00  86.42  1,119,204.83 
5040+820.00  4.32  8.64  10.00  86.42  1,119,118.41 
5040+840.00  4.32  8.64  10.00  86.42  1,119,031.99 
5040+860.00  4.32  8.64  10.00  86.42  1,118,945.57 
5040+880.00  4.32  8.64  10.00  86.42  1,118,859.15 
5040+900.00  4.32  8.64  10.00  86.42  1,118,772.73 
5040+920.00  4.32  8.64  10.00  86.42  1,118,686.31 
5040+940.00  4.32  8.64  10.00  86.42  1,118,599.89 
5040+960.00  4.32  8.64  10.00  86.42  1,118,513.47 
5040+980.00  4.32  8.64  10.00  86.42  1,118,427.05 
5041+000.00  4.32  8.64  10.00  86.42  1,118,340.63 
5041+020.00  4.32  8.64  10.00  86.42  1,118,254.21 
5041+040.00  4.32  8.64  10.00  86.42  1,118,167.79 
5041+060.00  4.32  8.64  10.00  86.42  1,118,081.37 
5041+080.00  4.32  8.64  10.00  86.42  1,117,994.95 
5041+100.00  4.32  8.64  10.00  86.42  1,117,908.53 
5041+120.00  4.32  8.64  10.00  86.42  1,117,822.11 
5041+140.00  4.32  8.64  10.00  86.42  1,117,735.69 
5041+160.00  4.32  8.64  10.00  86.42  1,117,649.27 
5041+180.00  4.32  8.64  10.00  86.42  1,117,562.85 
5041+200.00  4.32  8.64  10.00  86.42  1,117,476.43 
5041+200.00  4.32  8.64  0.00  0.00  1,117,476.43 
5041+220.00  4.32  8.64  10.00  86.42  1,117,390.01 
5041+235.00  4.32  8.64  7.50  64.82  1,117,325.19 
5041+235.00  4.32  8.64  0.00  0.00  1,117,325.19 
5041+235.00  0.00  4.32  0.00  0.00  1,117,325.19 

357 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5041+240.00  0.00  0.00  2.50  0.00  1,117,325.19 


5041+250.00  0.00  0.00  5.00  0.00  1,117,325.19 
5041+250.00  0.00  0.00  0.00  0.00  1,117,325.19 
5041+260.00  0.00  0.00  5.00  0.00  1,117,325.19 
5041+268.00  0.00  0.00  4.00  0.00  1,117,325.19 
5041+268.00  0.00  0.00  0.00  0.00  1,117,325.19 
5041+268.00  4.32  4.32  0.00  0.00  1,117,325.19 
5041+280.00  4.32  8.64  6.00  51.85  1,117,273.34 
5041+300.00  4.32  8.64  10.00  86.42  1,117,186.92 
5041+320.00  4.32  8.64  10.00  86.42  1,117,100.50 
5041+340.00  4.32  8.64  10.00  86.42  1,117,014.08 
5041+360.00  4.32  8.64  10.00  86.42  1,116,927.66 
5041+370.00  4.32  8.64  5.00  43.21  1,116,884.45 
5041+370.00  4.32  8.64  0.00  0.00  1,116,884.45 
5041+370.00  0.00  4.32  0.00  0.00  1,116,884.45 
5041+380.00  0.00  0.00  5.00  0.00  1,116,884.45 
5041+400.00  0.00  0.00  10.00  0.00  1,116,884.45 
5041+402.00  0.00  0.00  1.00  0.00  1,116,884.45 
5041+402.00  0.00  0.00  0.00  0.00  1,116,884.45 
5041+402.00  0.00  0.00  0.00  0.00  1,116,884.45 
5041+402.00  4.32  4.32  0.00  0.00  1,116,884.45 
5041+420.00  4.32  8.64  9.00  77.77  1,116,806.67 
5041+440.00  4.32  8.64  10.00  86.42  1,116,720.25 
5041+460.00  4.32  8.64  10.00  86.42  1,116,633.83 
5041+480.00  4.32  8.64  10.00  86.42  1,116,547.41 
5041+500.00  4.32  8.64  10.00  86.42  1,116,460.99 
5041+520.00  4.32  8.64  10.00  86.42  1,116,374.57 
5041+540.00  4.32  8.64  10.00  86.42  1,116,288.15 
5041+560.00  4.32  8.64  10.00  86.42  1,116,201.73 
5041+580.00  4.32  8.64  10.00  86.42  1,116,115.31 
5041+600.00  4.32  8.64  10.00  86.42  1,116,028.89 
5041+620.00  4.32  8.64  10.00  86.42  1,115,942.47 
5041+640.00  4.32  8.64  10.00  86.42  1,115,856.05 
5041+660.00  4.32  8.64  10.00  86.42  1,115,769.63 
5041+680.00  4.32  8.64  10.00  86.42  1,115,683.21 
5041+700.00  4.32  8.64  10.00  86.42  1,115,596.79 
5041+720.00  4.32  8.64  10.00  86.42  1,115,510.37 
5041+740.00  4.32  8.64  10.00  86.42  1,115,423.95 
5041+760.00  4.32  8.64  10.00  86.42  1,115,337.53 
5041+780.00  4.32  8.64  10.00  86.42  1,115,251.11 
5041+800.00  4.32  8.64  10.00  86.42  1,115,164.69 
5041+820.00  4.32  8.64  10.00  86.42  1,115,078.27 
5041+840.00  4.32  8.64  10.00  86.42  1,114,991.85 
5041+860.00  4.32  8.64  10.00  86.42  1,114,905.43 
5041+880.00  4.32  8.64  10.00  86.42  1,114,819.01 

358 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5041+900.00  4.32  8.64  10.00  86.42  1,114,732.59 


5041+920.00  4.32  8.64  10.00  86.42  1,114,646.17 
5041+940.00  4.32  8.64  10.00  86.42  1,114,559.75 
5041+960.00  4.32  8.64  10.00  86.42  1,114,473.33 
5041+980.00  4.32  8.64  10.00  86.42  1,114,386.91 
5042+000.00  4.32  8.64  10.00  86.42  1,114,300.49 
5042+002.37  4.32  8.64  1.18  10.24  1,114,290.26 
5042+020.00  4.32  8.64  8.82  76.18  1,114,214.07 
5042+032.37  4.32  8.64  6.18  53.45  1,114,160.63 
5042+040.00  4.32  8.64  3.82  32.97  1,114,127.65 
5042+060.00  4.32  8.64  10.00  86.42  1,114,041.23 
5042+080.00  4.32  8.64  10.00  86.42  1,113,954.81 
5042+100.00  4.32  8.64  10.00  86.42  1,113,868.39 
5042+120.00  4.32  8.64  10.00  86.42  1,113,781.97 
5042+120.89  4.32  8.64  0.44  3.84  1,113,778.13 
5042+140.00  4.32  8.64  9.56  82.58  1,113,695.55 
5042+150.89  4.32  8.64  5.44  47.05  1,113,648.50 
5042+160.00  4.32  8.64  4.56  39.37  1,113,609.13 
5042+180.00  4.32  8.64  10.00  86.42  1,113,522.71 
5042+200.00  4.32  8.64  10.00  86.42  1,113,436.29 
5042+220.00  4.32  8.64  10.00  86.42  1,113,349.87 
5042+240.00  4.32  8.64  10.00  86.42  1,113,263.45 
5042+260.00  4.32  8.64  10.00  86.42  1,113,177.03 
5042+280.00  4.32  8.64  10.00  86.42  1,113,090.61 
5042+300.00  4.32  8.64  10.00  86.42  1,113,004.19 
5042+320.00  4.32  8.64  10.00  86.42  1,112,917.77 
5042+340.00  4.32  8.64  10.00  86.42  1,112,831.35 
5042+360.00  4.32  8.64  10.00  86.42  1,112,744.93 
5042+380.00  4.32  8.64  10.00  86.42  1,112,658.51 
5042+400.00  4.32  8.64  10.00  86.42  1,112,572.09 
5042+420.00  4.32  8.64  10.00  86.42  1,112,485.67 
5042+440.00  4.32  8.64  10.00  86.42  1,112,399.25 
5042+460.00  4.32  8.64  10.00  86.42  1,112,312.83 
5042+460.03  4.32  8.64  0.01  0.13  1,112,312.71 
5042+470.00  4.33  8.66  4.99  43.15  1,112,269.56 
5042+480.00  4.37  8.70  5.00  43.51  1,112,226.05 
5042+480.03  4.37  8.74  0.01  0.13  1,112,225.92 
5042+490.00  4.39  8.76  4.99  43.65  1,112,182.27 
5042+500.00  4.44  8.82  5.00  44.11  1,112,138.16 
5042+510.00  4.52  8.96  5.00  44.79  1,112,093.38 
5042+520.00  4.64  9.16  5.00  45.80  1,112,047.58 
5042+530.00  4.79  9.43  5.00  47.16  1,112,000.42 
5042+540.00  4.98  9.77  5.00  48.85  1,111,951.57 
5042+550.00  5.18  10.16  5.00  50.80  1,111,900.78 
5042+560.00  5.38  10.57  5.00  52.83  1,111,847.95 

359 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5042+570.00  5.59  10.97  5.00  54.86  1,111,793.10 


5042+580.00  5.79  11.38  5.00  56.89  1,111,736.21 
5042+590.00  5.98  11.77  5.00  58.84  1,111,677.38 
5042+600.00  6.13  12.11  5.00  60.53  1,111,616.85 
5042+600.00  6.13  12.26  0.00  0.00  1,111,616.85 
5042+610.00  6.25  12.38  5.00  61.88  1,111,554.97 
5042+620.00  6.33  12.58  5.00  62.90  1,111,492.07 
5042+630.00  6.38  12.72  5.00  63.58  1,111,428.50 
5042+640.00  6.40  12.78  5.00  63.91  1,111,364.59 
5042+650.00  6.40  12.80  5.00  63.99  1,111,300.60 
5042+660.00  6.40  12.80  5.00  63.99  1,111,236.61 
5042+680.00  6.40  12.80  10.00  127.98  1,111,108.63 
5042+700.00  6.40  12.80  10.00  127.98  1,110,980.65 
5042+720.00  6.40  12.80  10.00  127.98  1,110,852.67 
5042+740.00  6.40  12.80  10.00  127.98  1,110,724.69 
5042+760.00  6.40  12.80  10.00  127.98  1,110,596.71 
5042+780.00  6.40  12.80  10.00  127.98  1,110,468.73 
5042+800.00  6.40  12.80  10.00  127.98  1,110,340.75 
5042+800.00  6.40  12.80  0.00  0.00  1,110,340.75 
5042+820.00  6.40  12.80  10.00  127.98  1,110,212.77 
5042+840.00  6.40  12.80  10.00  127.98  1,110,084.79 
5042+860.00  6.40  12.80  10.00  127.98  1,109,956.81 
5042+862.97  6.40  12.80  1.48  19.01  1,109,937.80 
5042+880.00  6.41  12.81  8.52  109.04  1,109,828.76 
5042+900.00  6.42  12.82  10.00  128.22  1,109,700.54 
5042+920.00  6.42  12.84  10.00  128.39  1,109,572.15 
5042+940.00  6.43  12.86  10.00  128.55  1,109,443.60 
5042+960.00  6.44  12.87  10.00  128.71  1,109,314.89 
5042+980.00  6.45  12.89  10.00  128.89  1,109,186.00 
5043+000.00  6.46  12.91  10.00  129.07  1,109,056.93 
 

TABLA 30 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 5071+500 – 6006+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

5071+500.00  4.16  4.16        1,300,000.00 


5071+520.00  4.16  8.32  10.00  83.22  1,299,916.78 
5071+540.00  4.16  8.32  10.00  83.22  1,299,833.56 
5071+560.00  4.16  8.32  10.00  83.22  1,299,750.34 
5071+580.00  4.16  8.32  10.00  83.22  1,299,667.12 
5071+580.00  4.16  8.32  0.00  0.00  1,299,667.12 

360 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

5071+600.00  4.16  8.32  10.00  83.22  1,299,583.90 


5071+620.00  4.16  8.32  10.00  83.22  1,299,500.68 
5071+640.00  4.16  8.32  10.00  83.22  1,299,417.46 
5071+660.00  4.16  8.32  10.00  83.22  1,299,334.24 
5071+660.00  4.16  8.32  0.00  0.00  1,299,334.24 
5071+680.00  4.16  8.32  10.00  83.22  1,299,251.02 
5071+700.00  4.16  8.32  10.00  83.22  1,299,167.80 
5071+720.00  4.16  8.32  10.00  83.22  1,299,084.58 
5071+740.00  4.16  8.32  10.00  83.22  1,299,001.36 
5071+760.00  4.16  8.32  10.00  83.22  1,298,918.14 
5071+780.00  4.16  8.32  10.00  83.22  1,298,834.92 
5071+800.00  4.16  8.32  10.00  83.22  1,298,751.70 
5071+820.00  4.16  8.32  10.00  83.22  1,298,668.48 
5071+840.00  4.16  8.32  10.00  83.22  1,298,585.26 
5071+860.00  4.16  8.32  10.00  83.22  1,298,502.04 
5071+880.00  4.16  8.32  10.00  83.22  1,298,418.82 
5071+900.00  4.16  8.32  10.00  83.22  1,298,335.60 
5071+920.00  4.16  8.32  10.00  83.22  1,298,252.38 
5071+940.00  4.16  8.32  10.00  83.22  1,298,169.16 
5071+960.00  4.16  8.32  10.00  83.22  1,298,085.94 
5071+980.00  4.16  8.32  10.00  83.22  1,298,002.72 
5072+000.00  4.16  8.32  10.00  83.22  1,297,919.50 
5072+020.00  4.16  8.32  10.00  83.22  1,297,836.28 
5072+040.00  4.16  8.32  10.00  83.22  1,297,753.06 
5072+060.00  4.16  8.32  10.00  83.22  1,297,669.84 
5072+080.00  4.16  8.32  10.00  83.22  1,297,586.62 
5072+100.00  4.16  8.32  10.00  83.22  1,297,503.40 
5072+120.00  4.16  8.32  10.00  83.22  1,297,420.18 
5072+140.00  4.16  8.32  10.00  83.22  1,297,336.96 
5072+145.35  4.16  8.32  2.67  22.25  1,297,314.71 
5072+160.00  4.30  8.46  7.33  61.97  1,297,252.74 
5072+165.35  4.37  8.67  2.67  23.17  1,297,229.57 
5072+175.00  4.38  8.75  4.83  42.25  1,297,187.32 
5072+180.00  4.41  8.79  2.50  21.98  1,297,165.34 
5072+185.00  4.43  8.84  2.50  22.11  1,297,143.23 
5072+195.00  4.52  8.95  5.00  44.76  1,297,098.47 
5072+200.00  4.58  9.10  2.50  22.74  1,297,075.73 
5072+205.00  4.64  9.21  2.50  23.03  1,297,052.70 
5072+215.00  4.79  9.42  5.00  47.11  1,297,005.60 
5072+220.00  4.88  9.67  2.50  24.16  1,296,981.43 
5072+225.00  4.97  9.85  2.50  24.63  1,296,956.81 
5072+235.00  5.18  10.15  5.00  50.74  1,296,906.07 
5072+240.00  5.28  10.45  2.50  26.13  1,296,879.94 
5072+245.00  5.38  10.65  2.50  26.64  1,296,853.31 
5072+255.00  5.58  10.96  5.00  54.79  1,296,798.52 

361 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

5072+260.00  5.68  11.26  2.50  28.16  1,296,770.36 


5072+265.00  5.78  11.47  2.50  28.66  1,296,741.70 
5072+275.00  5.97  11.75  5.00  58.77  1,296,682.93 
5072+280.00  6.05  12.02  2.50  30.05  1,296,652.88 
5072+285.00  6.13  12.17  2.50  30.43  1,296,622.45 
5072+295.00  6.24  12.37  5.00  61.85  1,296,560.61 
5072+300.00  6.29  12.53  2.50  31.33  1,296,529.28 
5072+305.00  6.33  12.62  2.50  31.54  1,296,497.74 
5072+315.00  6.38  12.71  5.00  63.56  1,296,434.18 
5072+320.00  6.39  12.77  2.50  31.93  1,296,402.24 
5072+325.00  6.40  12.79  2.50  31.98  1,296,370.27 
5072+335.00  6.40  12.80  5.00  64.00  1,296,306.27 
5072+340.00  6.40  12.80  2.50  32.00  1,296,274.28 
5072+360.00  6.40  12.80  10.00  127.99  1,296,146.29 
5072+380.00  6.40  12.80  10.00  127.99  1,296,018.30 
5072+400.00  6.40  12.80  10.00  127.99  1,295,890.31 
5072+420.00  6.40  12.80  10.00  128.00  1,295,762.31 
5072+440.00  6.40  12.80  10.00  128.00  1,295,634.31 
5072+460.00  6.40  12.80  10.00  128.00  1,295,506.31 
5072+480.00  6.40  12.80  10.00  127.99  1,295,378.32 
5072+500.00  6.40  12.80  10.00  127.99  1,295,250.33 
5072+520.00  6.40  12.80  10.00  127.99  1,295,122.34 
5072+540.00  6.40  12.80  10.00  127.99  1,294,994.35 
5072+560.00  6.40  12.80  10.00  127.99  1,294,866.36 
5072+580.00  6.40  12.80  10.00  127.99  1,294,738.37 
5072+600.00  6.40  12.80  10.00  128.00  1,294,610.37 
5072+620.00  6.40  12.80  10.00  128.00  1,294,482.37 
5072+640.00  6.40  12.80  10.00  128.00  1,294,354.37 
5072+660.00  6.40  12.80  10.00  127.99  1,294,226.38 
5072+660.00  6.40  12.80  0.00  0.00  1,294,226.38 
5072+680.00  6.40  12.80  10.00  127.99  1,294,098.39 
5072+700.00  6.40  12.80  10.00  127.99  1,293,970.40 
5072+720.00  6.40  12.80  10.00  127.98  1,293,842.42 
5072+740.00  6.40  12.80  10.00  127.99  1,293,714.43 
5072+760.00  6.40  12.80  10.00  128.00  1,293,586.43 
5072+760.00  6.40  12.80  0.00  0.00  1,293,586.43 
5072+780.00  6.40  12.80  10.00  127.99  1,293,458.44 
5072+795.00  6.40  12.80  7.50  95.99  1,293,362.45 
5072+800.00  6.40  12.80  2.50  32.00  1,293,330.45 
5072+820.00  6.40  12.80  10.00  127.99  1,293,202.46 
5072+840.00  6.40  12.80  10.00  127.98  1,293,074.48 
5072+860.00  6.40  12.80  10.00  127.98  1,292,946.50 
5072+880.00  6.40  12.80  10.00  127.98  1,292,818.52 
5072+900.00  6.40  12.80  10.00  127.98  1,292,690.54 
5072+920.00  6.40  12.80  10.00  127.98  1,292,562.56 

362 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

5072+940.00  6.40  12.80  10.00  127.98  1,292,434.58 


5072+960.00  6.40  12.80  10.00  127.98  1,292,306.60 
5072+980.00  6.40  12.80  10.00  127.98  1,292,178.62 
5073+000.00  6.40  12.80  10.00  127.98  1,292,050.64 
5073+020.00  6.40  12.80  10.00  127.98  1,291,922.66 
5073+040.00  6.40  12.80  10.00  127.98  1,291,794.68 
5073+060.00  6.40  12.80  10.00  127.98  1,291,666.70 
5073+080.00  6.40  12.80  10.00  127.98  1,291,538.72 
5073+100.00  6.40  12.80  10.00  127.98  1,291,410.74 
5073+120.00  6.40  12.80  10.00  127.98  1,291,282.76 
5073+140.00  6.40  12.80  10.00  127.98  1,291,154.78 
5073+160.00  6.40  12.80  10.00  127.98  1,291,026.80 
5073+180.00  6.40  12.80  10.00  127.98  1,290,898.82 
5073+200.00  6.40  12.80  10.00  127.98  1,290,770.84 
5073+220.00  6.40  12.80  10.00  127.98  1,290,642.86 
5073+240.00  6.40  12.80  10.00  127.98  1,290,514.88 
5073+260.00  6.40  12.80  10.00  127.98  1,290,386.90 
5073+280.00  6.40  12.80  10.00  127.98  1,290,258.92 
5073+300.00  6.40  12.80  10.00  127.98  1,290,130.94 
5073+320.00  6.40  12.80  10.00  127.98  1,290,002.96 
5073+340.00  6.40  12.80  10.00  127.98  1,289,874.98 
5073+360.00  6.40  12.80  10.00  127.99  1,289,746.99 
5073+380.00  6.40  12.80  10.00  127.99  1,289,619.00 
5073+400.00  6.40  12.80  10.00  127.99  1,289,491.01 
5073+420.00  6.40  12.80  10.00  128.00  1,289,363.01 
5073+440.00  6.40  12.80  10.00  128.00  1,289,235.01 
5073+460.00  6.40  12.80  10.00  128.00  1,289,107.01 
5073+480.00  6.40  12.80  10.00  127.99  1,288,979.02 
5073+500.00  6.40  12.80  10.00  127.99  1,288,851.03 
5073+520.00  6.40  12.80  10.00  128.00  1,288,723.03 
5073+540.00  6.40  12.80  10.00  127.99  1,288,595.04 
5073+560.00  6.40  12.80  10.00  127.98  1,288,467.06 
5073+580.00  6.40  12.80  10.00  127.99  1,288,339.07 
5073+600.00  6.40  12.80  10.00  128.00  1,288,211.07 
5073+620.00  6.40  12.80  10.00  127.99  1,288,083.08 
5073+640.00  6.40  12.80  10.00  127.98  1,287,955.10 
5073+660.00  6.40  12.80  10.00  127.99  1,287,827.11 
5073+680.00  6.40  12.80  10.00  128.00  1,287,699.11 
5073+700.00  6.40  12.80  10.00  128.00  1,287,571.11 
5073+720.00  6.40  12.80  10.00  128.00  1,287,443.11 
5073+740.00  6.40  12.80  10.00  127.99  1,287,315.12 
5073+760.00  6.40  12.80  10.00  127.99  1,287,187.13 
5073+780.00  6.40  12.80  10.00  127.99  1,287,059.14 
5073+800.00  6.40  12.80  10.00  127.98  1,286,931.16 
5073+815.00  6.40  12.80  7.50  95.99  1,286,835.18 

363 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

5073+820.00  6.40  12.80  2.50  32.00  1,286,803.18 


5073+825.00  6.40  12.80  2.50  32.00  1,286,771.19 
5073+835.00  6.38  12.78  5.00  63.92  1,286,707.27 
5073+840.00  6.36  12.74  2.50  31.86  1,286,675.42 
5073+845.00  6.33  12.69  2.50  31.73  1,286,643.68 
5073+855.00  6.25  12.58  5.00  62.92  1,286,580.76 
5073+860.00  6.19  12.44  2.50  31.11  1,286,549.66 
5073+865.00  6.13  12.33  2.50  30.81  1,286,518.85 
5073+875.00  5.98  12.12  5.00  60.58  1,286,458.27 
5073+880.00  5.89  11.87  2.50  29.68  1,286,428.59 
5073+885.00  5.80  11.69  2.50  29.22  1,286,399.38 
5073+895.00  5.59  11.39  5.00  56.96  1,286,342.42 
5073+900.00  5.49  11.09  2.50  27.72  1,286,314.71 
5073+905.00  5.39  10.88  2.50  27.21  1,286,287.50 
5073+915.00  5.19  10.58  5.00  52.90  1,286,234.61 
5073+920.00  5.09  10.27  2.50  25.69  1,286,208.92 
5073+925.00  4.99  10.07  2.50  25.18  1,286,183.74 
5073+935.00  4.80  9.78  5.00  48.91  1,286,134.83 
5073+940.00  4.72  9.52  2.50  23.80  1,286,111.04 
5073+945.00  4.64  9.37  2.50  23.41  1,286,087.63 
5073+955.00  4.52  9.17  5.00  45.84  1,286,041.79 
5073+960.00  4.48  9.01  2.50  22.51  1,286,019.27 
5073+965.00  4.44  8.92  2.50  22.30  1,285,996.97 
5073+975.00  4.39  8.83  5.00  44.13  1,285,952.85 
5073+980.00  4.38  8.76  2.50  21.91  1,285,930.94 
5073+985.32  4.37  8.75  2.66  23.25  1,285,907.68 
5074+000.00  4.21  8.58  7.34  62.99  1,285,844.69 
5074+005.32  4.16  8.37  2.66  22.26  1,285,822.44 
5074+020.00  4.16  8.32  7.34  61.10  1,285,761.34 
5074+040.00  4.16  8.32  10.00  83.22  1,285,678.12 
5074+060.00  4.16  8.32  10.00  83.22  1,285,594.90 
5074+080.00  4.16  8.32  10.00  83.22  1,285,511.68 
5074+100.00  4.16  8.32  10.00  83.22  1,285,428.46 
5074+120.00  4.16  8.32  10.00  83.22  1,285,345.24 
5074+140.00  4.16  8.32  10.00  83.22  1,285,262.02 
5074+160.00  4.16  8.32  10.00  83.22  1,285,178.80 
5074+180.00  4.16  8.32  10.00  83.22  1,285,095.58 
5074+200.00  4.16  8.32  10.00  83.22  1,285,012.36 
5074+220.00  4.16  8.32  10.00  83.22  1,284,929.14 
5074+240.00  4.16  8.32  10.00  83.22  1,284,845.92 
5074+260.00  4.16  8.32  10.00  83.22  1,284,762.70 
5074+280.00  4.16  8.32  10.00  83.22  1,284,679.48 
5074+300.00  4.16  8.32  10.00  83.22  1,284,596.26 
5074+320.00  4.16  8.32  10.00  83.22  1,284,513.04 
5074+340.00  4.16  8.32  10.00  83.22  1,284,429.82 

364 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

5074+360.00  4.16  8.32  10.00  83.22  1,284,346.60 


5074+380.00  4.16  8.32  10.00  83.22  1,284,263.38 
5074+400.00  4.16  8.32  10.00  83.22  1,284,180.16 
5074+400.19  4.16  8.32  0.09  0.79  1,284,179.38 
6000+617.91  4.16  4.16        1,300,000.00 
6000+620.00  4.16  8.32  1.04  8.68  1,299,991.32 
6000+640.00  4.16  8.32  10.00  83.22  1,299,908.10 
6000+660.00  4.16  8.32  10.00  83.22  1,299,824.88 
6000+680.00  4.16  8.32  10.00  83.22  1,299,741.66 
6000+700.00  4.16  8.32  10.00  83.22  1,299,658.44 
6000+700.01  4.16  8.32  0.00  0.04  1,299,658.39 
6000+720.00  4.16  8.32  10.00  83.18  1,299,575.22 
6000+740.00  4.16  8.32  10.00  83.22  1,299,492.00 
6000+760.00  4.16  8.32  10.00  83.22  1,299,408.78 
6000+780.00  4.16  8.32  10.00  83.22  1,299,325.56 
6000+800.00  4.16  8.32  10.00  83.22  1,299,242.34 
6000+800.00  4.16  8.32  0.00  0.00  1,299,242.34 
6000+820.00  4.16  8.32  10.00  83.22  1,299,159.12 
6000+840.00  4.16  8.32  10.00  83.22  1,299,075.90 
6000+860.00  4.16  8.32  10.00  83.22  1,298,992.68 
6000+880.00  4.16  8.32  10.00  83.22  1,298,909.46 
6000+880.00  4.16  8.32  0.00  0.00  1,298,909.46 
6000+900.00  4.16  8.32  10.00  83.22  1,298,826.24 
6000+920.00  4.16  8.32  10.00  83.22  1,298,743.02 
6000+940.00  4.16  8.32  10.00  83.22  1,298,659.80 
6000+960.00  4.16  8.32  10.00  83.22  1,298,576.58 
6000+980.00  4.16  8.32  10.00  83.22  1,298,493.36 
6001+000.00  4.16  8.32  10.00  83.22  1,298,410.14 
6001+020.00  4.16  8.32  10.00  83.22  1,298,326.92 
6001+040.00  4.16  8.32  10.00  83.22  1,298,243.70 
6001+060.00  4.16  8.32  10.00  83.22  1,298,160.48 
6001+080.00  4.16  8.32  10.00  83.22  1,298,077.26 
6001+100.00  4.16  8.32  10.00  83.22  1,297,994.04 
6001+120.00  4.16  8.32  10.00  83.22  1,297,910.82 
6001+140.00  4.16  8.32  10.00  83.22  1,297,827.60 
6001+160.00  4.16  8.32  10.00  83.22  1,297,744.38 
6001+180.00  4.16  8.32  10.00  83.22  1,297,661.16 
6001+200.00  4.16  8.32  10.00  83.22  1,297,577.94 
6001+220.00  4.16  8.32  10.00  83.22  1,297,494.72 
6001+240.00  4.16  8.32  10.00  83.22  1,297,411.50 
6001+260.00  4.16  8.32  10.00  83.22  1,297,328.28 
6001+280.00  4.16  8.32  10.00  83.22  1,297,245.06 
6001+300.00  4.16  8.32  10.00  83.22  1,297,161.84 
6001+320.00  4.16  8.32  10.00  83.22  1,297,078.62 
6001+340.00  4.16  8.32  10.00  83.22  1,296,995.40 

365 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

6001+360.00  4.16  8.32  10.00  83.22  1,296,912.18 


6001+380.00  4.16  8.32  10.00  83.22  1,296,828.96 
6001+400.00  4.16  8.32  10.00  83.22  1,296,745.74 
6001+420.00  4.16  8.32  10.00  83.22  1,296,662.52 
6001+440.00  4.16  8.32  10.00  83.22  1,296,579.30 
6001+460.00  4.16  8.32  10.00  83.22  1,296,496.08 
6001+480.00  4.16  8.32  10.00  83.22  1,296,412.86 
6001+500.00  4.16  8.32  10.00  83.22  1,296,329.64 
6001+520.00  4.16  8.32  10.00  83.22  1,296,246.42 
6001+540.00  4.16  8.32  10.00  83.22  1,296,163.20 
6001+560.00  4.16  8.32  10.00  83.22  1,296,079.98 
6001+580.00  4.16  8.32  10.00  83.22  1,295,996.76 
6001+600.00  4.16  8.32  10.00  83.22  1,295,913.54 
6001+620.00  4.16  8.32  10.00  83.22  1,295,830.32 
6001+640.00  4.16  8.32  10.00  83.22  1,295,747.10 
6001+660.00  4.16  8.32  10.00  83.22  1,295,663.88 
6001+680.00  4.16  8.32  10.00  83.22  1,295,580.66 
6001+700.00  4.16  8.32  10.00  83.22  1,295,497.44 
6001+720.00  4.16  8.32  10.00  83.22  1,295,414.22 
6001+740.00  4.16  8.32  10.00  83.22  1,295,331.00 
6001+760.00  4.16  8.32  10.00  83.22  1,295,247.78 
6001+780.00  4.16  8.32  10.00  83.22  1,295,164.56 
6001+800.00  4.16  8.32  10.00  83.22  1,295,081.34 
6001+820.00  4.16  8.32  10.00  83.22  1,294,998.12 
6001+840.00  4.16  8.32  10.00  83.22  1,294,914.90 
6001+860.00  4.16  8.32  10.00  83.22  1,294,831.68 
6001+880.00  4.16  8.32  10.00  83.22  1,294,748.46 
6001+900.00  4.16  8.32  10.00  83.22  1,294,665.24 
6001+920.00  4.16  8.32  10.00  83.22  1,294,582.02 
6001+940.00  4.16  8.32  10.00  83.22  1,294,498.80 
6001+960.00  4.16  8.32  10.00  83.22  1,294,415.58 
6001+980.00  4.16  8.32  10.00  83.22  1,294,332.36 
6002+000.00  4.16  8.32  10.00  83.22  1,294,249.14 
6002+020.00  4.16  8.32  10.00  83.22  1,294,165.92 
6002+040.00  4.16  8.32  10.00  83.22  1,294,082.70 
6002+060.00  4.16  8.32  10.00  83.22  1,293,999.48 
6002+080.00  4.16  8.32  10.00  83.22  1,293,916.26 
6002+100.00  4.16  8.32  10.00  83.22  1,293,833.04 
6002+120.00  4.16  8.32  10.00  83.22  1,293,749.82 
6002+140.00  4.16  8.32  10.00  83.22  1,293,666.60 
6002+160.00  4.16  8.32  10.00  83.22  1,293,583.38 
6002+180.00  4.16  8.32  10.00  83.22  1,293,500.16 
6002+200.00  4.16  8.32  10.00  83.22  1,293,416.94 
6002+220.00  4.16  8.32  10.00  83.22  1,293,333.72 
6002+240.00  4.16  8.32  10.00  83.22  1,293,250.50 

366 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

6002+260.00  4.16  8.32  10.00  83.22  1,293,167.28 


6002+280.00  4.16  8.32  10.00  83.22  1,293,084.06 
6002+300.00  4.16  8.32  10.00  83.22  1,293,000.84 
6002+320.00  4.16  8.32  10.00  83.22  1,292,917.62 
6002+340.00  4.16  8.32  10.00  83.22  1,292,834.40 
6002+360.00  4.16  8.32  10.00  83.22  1,292,751.18 
6002+380.00  4.16  8.32  10.00  83.22  1,292,667.96 
6002+400.00  4.16  8.32  10.00  83.22  1,292,584.74 
6002+420.00  4.16  8.32  10.00  83.22  1,292,501.52 
6002+440.00  4.16  8.32  10.00  83.22  1,292,418.30 
6002+460.00  4.16  8.32  10.00  83.22  1,292,335.08 
6002+480.00  4.16  8.32  10.00  83.22  1,292,251.86 
6002+500.00  4.16  8.32  10.00  83.22  1,292,168.64 
6002+520.00  4.16  8.32  10.00  83.22  1,292,085.42 
6002+540.00  4.16  8.32  10.00  83.22  1,292,002.20 
6002+560.00  4.16  8.32  10.00  83.22  1,291,918.98 
6002+580.00  4.16  8.32  10.00  83.22  1,291,835.76 
6002+600.00  4.16  8.32  10.00  83.22  1,291,752.54 
6002+620.00  4.16  8.32  10.00  83.22  1,291,669.32 
6002+640.00  4.16  8.32  10.00  83.22  1,291,586.10 
6002+660.00  4.16  8.32  10.00  83.22  1,291,502.88 
6002+680.00  4.16  8.32  10.00  83.22  1,291,419.66 
6002+700.00  4.16  8.32  10.00  83.22  1,291,336.44 
6002+720.00  4.16  8.32  10.00  83.22  1,291,253.22 
6002+740.00  4.16  8.32  10.00  83.22  1,291,170.00 
6002+760.00  4.16  8.32  10.00  83.22  1,291,086.78 
6002+780.00  4.16  8.32  10.00  83.22  1,291,003.56 
6002+800.00  4.16  8.32  10.00  83.22  1,290,920.34 
6002+820.00  4.16  8.32  10.00  83.22  1,290,837.12 
6002+830.00  4.16  8.32  5.00  41.61  1,290,795.51 
6002+830.00  4.16  8.32  0.00  0.00  1,290,795.51 
6002+840.00  4.16  8.32  5.00  41.61  1,290,753.90 
6002+860.00  4.16  8.32  10.00  83.22  1,290,670.68 
6002+880.00  4.16  8.32  10.00  83.22  1,290,587.46 
6002+900.00  4.16  8.32  10.00  83.22  1,290,504.24 
6002+920.00  4.16  8.32  10.00  83.22  1,290,421.02 
6002+940.00  4.16  8.32  10.00  83.22  1,290,337.80 
6002+960.00  4.16  8.32  10.00  83.22  1,290,254.58 
6002+980.00  4.16  8.32  10.00  83.22  1,290,171.36 
6002+980.00  4.16  8.32  0.00  0.00  1,290,171.36 
6003+000.00  4.16  8.32  10.00  83.22  1,290,088.14 
6003+020.00  4.16  8.32  10.00  83.22  1,290,004.92 
6003+040.00  4.16  8.32  10.00  83.22  1,289,921.70 
6003+060.00  4.16  8.32  10.00  83.22  1,289,838.48 
6003+080.00  4.16  8.32  10.00  83.22  1,289,755.26 

367 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

6003+100.00  4.16  8.32  10.00  83.22  1,289,672.04 


6003+120.00  4.16  8.32  10.00  83.22  1,289,588.82 
6003+140.00  4.16  8.32  10.00  83.22  1,289,505.60 
6003+160.00  4.16  8.32  10.00  83.22  1,289,422.38 
6003+180.00  4.16  8.32  10.00  83.22  1,289,339.16 
6003+200.00  4.16  8.32  10.00  83.22  1,289,255.94 
6003+220.00  4.16  8.32  10.00  83.22  1,289,172.72 
6003+240.00  4.16  8.32  10.00  83.22  1,289,089.50 
6003+260.00  4.16  8.32  10.00  83.22  1,289,006.28 
6003+280.00  4.16  8.32  10.00  83.22  1,288,923.06 
6003+300.00  4.16  8.32  10.00  83.22  1,288,839.84 
6003+320.00  4.16  8.32  10.00  83.22  1,288,756.62 
6003+340.00  4.16  8.32  10.00  83.22  1,288,673.40 
6003+360.00  4.16  8.32  10.00  83.22  1,288,590.18 
6003+380.00  4.16  8.32  10.00  83.22  1,288,506.96 
6003+400.00  4.16  8.32  10.00  83.22  1,288,423.74 
6003+420.00  4.16  8.32  10.00  83.22  1,288,340.52 
6003+440.00  4.16  8.32  10.00  83.22  1,288,257.30 
6003+460.00  4.16  8.32  10.00  83.22  1,288,174.08 
6003+480.00  4.16  8.32  10.00  83.22  1,288,090.86 
6003+500.00  4.16  8.32  10.00  83.22  1,288,007.64 
6003+520.00  4.16  8.32  10.00  83.22  1,287,924.42 
6003+536.24  4.16  8.32  8.12  67.57  1,287,856.84 
6003+536.24  0.00  4.16  0.00  0.00  1,287,856.84 
6003+536.24  0.00  0.00  0.00  0.00  1,287,856.84 
6003+540.00  0.00  0.00  1.88  0.00  1,287,856.84 
6003+560.00  0.00  0.00  10.00  0.00  1,287,856.84 
6003+568.24  0.00  0.00  4.12  0.00  1,287,856.84 
6003+568.24  0.00  0.00  0.00  0.00  1,287,856.84 
6003+568.24  4.16  4.16  0.00  0.00  1,287,856.84 
6003+580.00  4.16  8.32  5.88  48.93  1,287,807.91 
6003+600.00  4.16  8.32  10.00  83.22  1,287,724.69 
6003+620.00  4.16  8.32  10.00  83.22  1,287,641.47 
6003+640.00  4.16  8.32  10.00  83.22  1,287,558.25 
6003+660.00  4.16  8.32  10.00  83.22  1,287,475.03 
6003+680.00  4.16  8.32  10.00  83.22  1,287,391.81 
6003+700.00  4.16  8.32  10.00  83.22  1,287,308.59 
6003+720.00  4.16  8.32  10.00  83.22  1,287,225.37 
6003+740.00  4.16  8.32  10.00  83.22  1,287,142.15 
6003+760.00  4.16  8.32  10.00  83.22  1,287,058.93 
6003+780.00  4.16  8.32  10.00  83.22  1,286,975.71 
6003+800.00  4.16  8.32  10.00  83.22  1,286,892.49 
6003+820.00  4.16  8.32  10.00  83.22  1,286,809.27 
6003+840.00  4.16  8.32  10.00  83.22  1,286,726.05 
6003+860.00  4.16  8.32  10.00  83.22  1,286,642.83 

368 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

6003+880.00  4.16  8.32  10.00  83.22  1,286,559.61 


6003+900.00  4.16  8.32  10.00  83.22  1,286,476.39 
6003+900.00  4.16  8.32  0.00  0.00  1,286,476.39 
6003+920.00  4.16  8.32  10.00  83.22  1,286,393.17 
6003+940.00  4.16  8.32  10.00  83.22  1,286,309.95 
6003+960.00  4.16  8.32  10.00  83.22  1,286,226.73 
6003+974.92  4.16  8.32  7.46  62.09  1,286,164.64 
6003+980.00  4.16  8.32  2.54  21.13  1,286,143.51 
6004+000.00  4.16  8.32  10.00  83.22  1,286,060.29 
6004+020.00  4.16  8.32  10.00  83.22  1,285,977.07 
6004+040.00  4.16  8.32  10.00  83.22  1,285,893.85 
6004+060.00  4.16  8.32  10.00  83.22  1,285,810.63 
6004+080.00  4.16  8.32  10.00  83.22  1,285,727.41 
6004+100.00  4.16  8.32  10.00  83.22  1,285,644.19 
6004+120.00  4.16  8.32  10.00  83.22  1,285,560.97 
6004+124.92  4.16  8.32  2.46  20.48  1,285,540.49 
6004+140.00  4.16  8.32  7.54  62.74  1,285,477.75 
6004+160.00  4.16  8.32  10.00  83.22  1,285,394.53 
6004+180.00  4.16  8.32  10.00  83.22  1,285,311.31 
6004+200.00  4.16  8.32  10.00  83.22  1,285,228.09 
6004+220.00  4.16  8.32  10.00  83.22  1,285,144.87 
6004+240.00  4.16  8.32  10.00  83.22  1,285,061.65 
6004+260.00  4.16  8.32  10.00  83.22  1,284,978.43 
6004+280.00  4.16  8.32  10.00  83.22  1,284,895.21 
6004+300.00  4.16  8.32  10.00  83.22  1,284,811.99 
6004+320.00  4.16  8.32  10.00  83.22  1,284,728.77 
6004+340.00  4.16  8.32  10.00  83.22  1,284,645.55 
6004+355.41  4.16  8.32  7.71  64.14  1,284,581.41 
6004+360.00  4.16  8.32  2.29  19.08  1,284,562.33 
6004+380.00  4.16  8.32  10.00  83.22  1,284,479.11 
6004+400.00  4.16  8.32  10.00  83.22  1,284,395.89 
6004+420.00  4.16  8.32  10.00  83.23  1,284,312.66 
6004+440.00  4.16  8.32  10.00  83.23  1,284,229.43 
6004+460.00  4.16  8.32  10.00  83.22  1,284,146.21 
6004+480.00  4.16  8.32  10.00  83.22  1,284,062.99 
6004+500.00  4.16  8.32  10.00  83.22  1,283,979.77 
6004+505.41  4.16  8.32  2.71  22.53  1,283,957.24 
6004+520.00  4.16  8.32  7.29  60.69  1,283,896.55 
6004+540.00  4.16  8.32  10.00  83.22  1,283,813.33 
6004+560.00  4.16  8.32  10.00  83.22  1,283,730.11 
6004+580.00  4.16  8.32  10.00  83.22  1,283,646.89 
6004+600.00  4.16  8.32  10.00  83.22  1,283,563.67 
6004+615.00  4.16  8.32  7.50  62.42  1,283,501.25 
6004+615.00  4.16  8.32  0.00  0.00  1,283,501.25 
6004+620.00  4.16  8.32  2.50  20.81  1,283,480.45 

369 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

6004+640.00  4.16  8.32  10.00  83.22  1,283,397.23 


6004+660.00  4.16  8.32  10.00  83.22  1,283,314.01 
6004+680.00  4.16  8.32  10.00  83.22  1,283,230.79 
6004+700.00  4.16  8.32  10.00  83.22  1,283,147.57 
6004+720.00  4.16  8.32  10.00  83.22  1,283,064.35 
6004+740.00  4.16  8.32  10.00  83.22  1,282,981.13 
6004+760.00  4.16  8.32  10.00  83.22  1,282,897.91 
6004+780.00  4.16  8.32  10.00  83.22  1,282,814.69 
6004+800.00  4.16  8.32  10.00  83.22  1,282,731.47 
6004+820.00  4.16  8.32  10.00  83.22  1,282,648.25 
6004+840.00  4.16  8.32  10.00  83.22  1,282,565.03 
6004+860.00  4.16  8.32  10.00  83.22  1,282,481.81 
6004+880.00  4.16  8.32  10.00  83.22  1,282,398.59 
6004+900.00  4.16  8.32  10.00  83.22  1,282,315.37 
6004+920.00  4.16  8.32  10.00  83.22  1,282,232.15 
6004+940.00  4.16  8.32  10.00  83.22  1,282,148.93 
6004+960.00  4.16  8.32  10.00  83.22  1,282,065.71 
6004+980.00  4.16  8.32  10.00  83.22  1,281,982.49 
6005+000.00  4.16  8.32  10.00  83.22  1,281,899.27 
6005+020.00  4.16  8.32  10.00  83.22  1,281,816.05 
6005+040.00  4.16  8.32  10.00  83.22  1,281,732.83 
6005+060.00  4.16  8.32  10.00  83.22  1,281,649.61 
6005+080.00  4.16  8.32  10.00  83.22  1,281,566.39 
6005+100.00  4.16  8.32  10.00  83.22  1,281,483.17 
6005+104.49  4.16  8.32  2.24  18.68  1,281,464.49 
6005+120.00  4.16  8.32  7.76  64.54  1,281,399.95 
6005+140.00  4.16  8.32  10.00  83.22  1,281,316.73 
6005+160.00  4.16  8.32  10.00  83.22  1,281,233.51 
6005+180.00  4.16  8.32  10.00  83.22  1,281,150.29 
6005+200.00  4.16  8.32  10.00  83.22  1,281,067.07 
6005+220.00  4.16  8.32  10.00  83.22  1,280,983.85 
6005+240.00  4.16  8.32  10.00  83.22  1,280,900.63 
6005+254.49  4.16  8.32  7.24  60.29  1,280,840.34 
6005+260.00  4.16  8.32  2.76  22.93  1,280,817.41 
6005+280.00  4.16  8.32  10.00  83.22  1,280,734.19 
6005+300.00  4.16  8.32  10.00  83.22  1,280,650.97 
6005+320.00  4.16  8.32  10.00  83.22  1,280,567.75 
6005+340.00  4.16  8.32  10.00  83.22  1,280,484.53 
6005+360.00  4.16  8.32  10.00  83.22  1,280,401.31 
6005+361.69  4.16  8.32  0.85  7.04  1,280,394.26 
6005+380.00  4.16  8.32  9.15  76.18  1,280,318.09 
6005+400.00  4.16  8.32  10.00  83.22  1,280,234.87 
6005+420.00  4.16  8.32  10.00  83.22  1,280,151.65 
6005+440.00  4.16  8.32  10.00  83.22  1,280,068.43 
6005+460.00  4.16  8.32  10.00  83.22  1,279,985.21 

370 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6000+617.91 AL 6006+000.00   

6005+480.00  4.16  8.32  10.00  83.22  1,279,901.99 


6005+500.00  4.16  8.32  10.00  83.22  1,279,818.77 
6005+511.69  4.16  8.32  5.85  48.65  1,279,770.11 
6005+520.00  4.16  8.32  4.15  34.57  1,279,735.55 
6005+540.00  4.16  8.32  10.00  83.22  1,279,652.33 
6005+560.00  4.16  8.32  10.00  83.22  1,279,569.11 
6005+580.00  4.16  8.32  10.00  83.22  1,279,485.89 
6005+600.00  4.16  8.32  10.00  83.22  1,279,402.67 
6005+620.00  4.16  8.32  10.00  83.22  1,279,319.45 
6005+640.00  4.16  8.32  10.00  83.22  1,279,236.23 
6005+660.00  4.16  8.32  10.00  83.22  1,279,153.01 
6005+680.00  4.16  8.32  10.00  83.22  1,279,069.79 
6005+700.00  4.16  8.32  10.00  83.22  1,278,986.57 
6005+720.00  4.16  8.32  10.00  83.22  1,278,903.35 
6005+740.00  4.16  8.32  10.00  83.22  1,278,820.13 
6005+760.00  4.16  8.32  10.00  83.22  1,278,736.91 
6005+780.00  4.16  8.32  10.00  83.22  1,278,653.69 
6005+800.00  4.16  8.32  10.00  83.22  1,278,570.47 
6005+820.00  4.16  8.32  10.00  83.22  1,278,487.25 
6005+840.00  4.16  8.32  10.00  83.22  1,278,404.03 
6005+860.00  4.16  8.32  10.00  83.22  1,278,320.81 
6005+880.00  4.16  8.32  10.00  83.22  1,278,237.59 
6005+900.00  4.16  8.32  10.00  83.22  1,278,154.37 
6005+920.00  4.16  8.32  10.00  83.22  1,278,071.15 
6005+940.00  4.16  8.32  10.00  83.22  1,277,987.93 
6005+960.00  4.16  8.32  10.00  83.22  1,277,904.71 
6005+980.00  4.16  8.32  10.00  83.22  1,277,821.49 
6006+000.00  4.16  8.32  10.00  83.22  1,277,738.27 
 

TABLA 31 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 5043+000 – 5051+000 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5043+000.00  6.32  6.32     0.00  1,103,768.03 


5043+020.00  6.32  12.64  10.00  126.42  1,103,641.61 
5043+040.00  6.32  12.64  10.00  126.42  1,103,515.19 
5043+060.00  6.32  12.64  10.00  126.42  1,103,388.77 
5043+080.00  6.32  12.64  10.00  126.42  1,103,262.35 
5043+100.00  6.32  12.64  10.00  126.42  1,103,135.93 
5043+120.00  6.32  12.64  10.00  126.42  1,103,009.51 
5043+140.00  6.32  12.64  10.00  126.42  1,102,883.09 

371 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5043+160.00  6.32  12.64  10.00  126.42  1,102,756.67 


5043+180.00  6.32  12.64  10.00  126.42  1,102,630.25 
5043+200.00  6.32  12.64  10.00  126.42  1,102,503.83 
5043+220.00  6.32  12.64  10.00  126.42  1,102,377.41 
5043+240.00  6.32  12.64  10.00  126.42  1,102,250.99 
5043+260.00  6.32  12.64  10.00  126.42  1,102,124.57 
5043+280.00  6.32  12.64  10.00  126.42  1,101,998.15 
5043+300.00  6.32  12.64  10.00  126.42  1,101,871.73 
5043+320.00  6.32  12.64  10.00  126.42  1,101,745.31 
5043+340.00  6.32  12.64  10.00  126.42  1,101,618.89 
5043+360.00  6.32  12.64  10.00  126.42  1,101,492.47 
5043+380.00  6.32  12.64  10.00  126.42  1,101,366.05 
5043+400.00  6.32  12.64  10.00  126.42  1,101,239.63 
5043+420.00  6.32  12.64  10.00  126.42  1,101,113.21 
5043+440.00  6.32  12.64  10.00  126.42  1,100,986.79 
5043+460.00  6.32  12.64  10.00  126.42  1,100,860.37 
5043+480.00  6.32  12.64  10.00  126.42  1,100,733.95 
5043+500.00  6.32  12.64  10.00  126.42  1,100,607.53 
5043+520.00  6.32  12.64  10.00  126.42  1,100,481.11 
5043+540.00  6.32  12.64  10.00  126.42  1,100,354.69 
5043+560.00  6.32  12.64  10.00  126.42  1,100,228.27 
5043+580.00  6.32  12.64  10.00  126.42  1,100,101.85 
5043+600.00  6.32  12.64  10.00  126.42  1,099,975.43 
5043+620.00  6.32  12.64  10.00  126.42  1,099,849.01 
5043+640.00  6.32  12.64  10.00  126.42  1,099,722.59 
5043+660.00  6.32  12.64  10.00  126.42  1,099,596.17 
5043+680.00  6.32  12.64  10.00  126.42  1,099,469.75 
5043+700.00  6.32  12.64  10.00  126.42  1,099,343.33 
5043+720.00  6.32  12.64  10.00  126.42  1,099,216.91 
5043+740.00  6.32  12.64  10.00  126.42  1,099,090.49 
5043+760.00  6.32  12.64  10.00  126.42  1,098,964.07 
5043+780.00  6.32  12.64  10.00  126.42  1,098,837.65 
5043+800.00  6.32  12.64  10.00  126.42  1,098,711.23 
5043+820.00  6.32  12.64  10.00  126.42  1,098,584.81 
5043+840.00  6.32  12.64  10.00  126.42  1,098,458.39 
5043+860.00  6.32  12.64  10.00  126.42  1,098,331.97 
5043+880.00  6.32  12.64  10.00  126.42  1,098,205.55 
5043+900.00  6.32  12.64  10.00  126.42  1,098,079.13 
5043+920.00  6.32  12.64  10.00  126.42  1,097,952.71 
5043+940.00  6.32  12.64  10.00  126.42  1,097,826.29 
5043+960.00  6.32  12.64  10.00  126.42  1,097,699.87 
5043+980.00  6.32  12.64  10.00  126.42  1,097,573.45 
5044+000.00  6.32  12.64  10.00  126.42  1,097,447.03 
5044+020.00  6.32  12.64  10.00  126.42  1,097,320.61 
5044+040.00  6.32  12.64  10.00  126.42  1,097,194.19 

372 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5044+060.00  6.32  12.64  10.00  126.42  1,097,067.77 


5044+080.00  6.32  12.64  10.00  126.42  1,096,941.35 
5044+100.00  6.32  12.64  10.00  126.42  1,096,814.93 
5044+120.00  6.32  12.64  10.00  126.42  1,096,688.51 
5044+140.00  6.32  12.64  10.00  126.42  1,096,562.09 
5044+160.00  6.32  12.64  10.00  126.42  1,096,435.67 
5044+180.00  6.32  12.64  10.00  126.42  1,096,309.25 
5044+200.00  6.32  12.64  10.00  126.42  1,096,182.83 
5044+220.00  6.32  12.64  10.00  126.42  1,096,056.41 
5044+240.00  6.32  12.64  10.00  126.42  1,095,929.99 
5044+260.00  6.32  12.64  10.00  126.42  1,095,803.57 
5044+280.00  6.32  12.64  10.00  126.42  1,095,677.15 
5044+300.00  6.32  12.64  10.00  126.42  1,095,550.73 
5044+320.00  4.32  10.64  10.00  106.42  1,095,444.31 
5044+340.00  4.32  8.64  10.00  86.42  1,095,357.89 
5044+360.00  4.32  8.64  10.00  86.42  1,095,271.47 
5044+380.00  4.32  8.64  10.00  86.42  1,095,185.05 
5044+400.00  4.32  8.64  10.00  86.42  1,095,098.63 
5044+420.00  4.32  8.64  10.00  86.42  1,095,012.21 
5044+440.00  4.32  8.64  10.00  86.42  1,094,925.79 
5044+460.00  4.32  8.64  10.00  86.42  1,094,839.37 
5044+480.00  4.32  8.64  10.00  86.42  1,094,752.95 
5044+500.00  4.32  8.64  10.00  86.42  1,094,666.53 
5044+520.00  4.32  8.64  10.00  86.42  1,094,580.11 
5044+540.00  4.32  8.64  10.00  86.42  1,094,493.69 
5044+560.00  4.32  8.64  10.00  86.43  1,094,407.26 
5044+580.00  4.32  8.64  10.00  86.43  1,094,320.83 
5044+600.00  4.32  8.64  10.00  86.42  1,094,234.41 
5044+620.00  4.32  8.64  10.00  86.42  1,094,147.99 
5044+640.00  4.32  8.64  10.00  86.42  1,094,061.57 
5044+660.00  4.32  8.64  10.00  86.42  1,093,975.15 
5044+680.00  4.32  8.64  10.00  86.42  1,093,888.73 
5044+700.00  4.32  8.64  10.00  86.42  1,093,802.31 
5044+720.00  4.32  8.64  10.00  86.42  1,093,715.89 
5044+740.00  4.32  8.64  10.00  86.43  1,093,629.46 
5044+760.00  4.32  8.64  10.00  86.43  1,093,543.03 
5044+780.00  4.32  8.64  10.00  86.42  1,093,456.61 
5044+800.00  4.32  8.64  10.00  86.42  1,093,370.19 
5044+820.00  4.32  8.64  10.00  86.42  1,093,283.77 
5044+840.00  4.32  8.64  10.00  86.42  1,093,197.35 
5044+860.00  4.32  8.64  10.00  86.42  1,093,110.93 
5044+880.00  4.32  8.64  10.00  86.42  1,093,024.51 
5044+900.00  4.32  8.64  10.00  86.42  1,092,938.09 
5044+920.00  4.32  8.64  10.00  86.43  1,092,851.66 
5044+940.00  4.32  8.64  10.00  86.43  1,092,765.23 

373 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5044+960.00  4.32  8.64  10.00  86.42  1,092,678.81 


5044+980.00  4.32  8.64  10.00  86.42  1,092,592.39 
5045+000.00  4.32  8.64  10.00  86.42  1,092,505.97 
5045+020.00  4.32  8.64  10.00  86.42  1,092,419.55 
5045+040.00  4.32  8.64  10.00  86.42  1,092,333.13 
5045+060.00  4.32  8.64  10.00  86.42  1,092,246.71 
5045+080.00  4.32  8.64  10.00  86.42  1,092,160.29 
5045+100.00  4.32  8.64  10.00  86.42  1,092,073.87 
5045+120.00  4.32  8.64  10.00  86.42  1,091,987.45 
5045+140.00  4.32  8.64  10.00  86.42  1,091,901.03 
5045+160.00  4.32  8.64  10.00  86.42  1,091,814.61 
5045+180.00  4.32  8.64  10.00  86.42  1,091,728.19 
5045+200.00  4.32  8.64  10.00  86.43  1,091,641.76 
5045+220.00  4.32  8.64  10.00  86.44  1,091,555.32 
5045+240.00  4.32  8.64  10.00  86.44  1,091,468.88 
5045+260.00  4.32  8.64  10.00  86.44  1,091,382.44 
5045+280.00  4.32  8.64  10.00  86.44  1,091,296.00 
5045+300.00  4.32  8.64  10.00  86.44  1,091,209.56 
5045+320.00  4.32  8.64  10.00  86.44  1,091,123.12 
5045+340.00  4.32  8.64  10.00  86.44  1,091,036.68 
5045+360.00  4.32  8.64  10.00  86.44  1,090,950.24 
5045+380.00  4.32  8.64  10.00  86.43  1,090,863.81 
5045+400.00  4.32  8.64  10.00  86.42  1,090,777.39 
5045+420.00  4.32  8.64  10.00  86.42  1,090,690.97 
5045+440.00  4.32  8.64  10.00  86.42  1,090,604.55 
5045+460.00  4.32  8.64  10.00  86.42  1,090,518.13 
5045+480.00  4.32  8.64  10.00  86.42  1,090,431.71 
5045+500.00  4.32  8.64  10.00  86.42  1,090,345.29 
5045+520.00  4.32  8.64  10.00  86.42  1,090,258.87 
5045+540.00  4.32  8.64  10.00  86.42  1,090,172.45 
5045+560.00  4.32  8.64  10.00  86.42  1,090,086.03 
5045+580.00  4.32  8.64  10.00  86.42  1,089,999.61 
5045+600.00  4.32  8.64  10.00  86.42  1,089,913.19 
5045+620.00  4.32  8.64  10.00  86.42  1,089,826.77 
5045+640.00  4.32  8.64  10.00  86.42  1,089,740.35 
5045+660.00  4.32  8.64  10.00  86.42  1,089,653.93 
5045+680.00  4.32  8.64  10.00  86.42  1,089,567.51 
5045+700.00  4.32  8.64  10.00  86.42  1,089,481.09 
5045+720.00  4.32  8.64  10.00  86.42  1,089,394.67 
5045+740.00  4.32  8.64  10.00  86.42  1,089,308.25 
5045+760.00  4.32  8.64  10.00  86.42  1,089,221.83 
5045+780.00  4.32  8.64  10.00  86.42  1,089,135.41 
5045+800.00  4.32  8.64  10.00  86.42  1,089,048.99 
5045+820.00  4.32  8.64  10.00  86.42  1,088,962.57 
5045+840.00  4.32  8.64  10.00  86.42  1,088,876.15 

374 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5045+860.00  4.32  8.64  10.00  86.42  1,088,789.73 


5045+880.00  4.32  8.64  10.00  86.42  1,088,703.31 
5045+900.00  4.32  8.64  10.00  86.42  1,088,616.89 
5045+920.00  4.32  8.64  10.00  86.42  1,088,530.47 
5045+940.00  4.32  8.64  10.00  86.42  1,088,444.05 
5045+960.00  4.32  8.64  10.00  86.42  1,088,357.63 
5045+980.00  4.32  8.64  10.00  86.42  1,088,271.21 
5046+000.00  4.32  8.64  10.00  86.42  1,088,184.79 
5046+020.00  4.32  8.64  10.00  86.42  1,088,098.37 
5046+040.00  4.32  8.64  10.00  86.42  1,088,011.95 
5046+060.00  4.32  8.64  10.00  86.42  1,087,925.53 
5046+080.00  4.32  8.64  10.00  86.42  1,087,839.11 
5046+100.00  4.32  8.64  10.00  86.42  1,087,752.69 
5046+120.00  4.32  8.64  10.00  86.42  1,087,666.27 
5046+140.00  4.32  8.64  10.00  86.42  1,087,579.85 
5046+160.00  4.32  8.64  10.00  86.42  1,087,493.43 
5046+180.00  4.32  8.64  10.00  86.42  1,087,407.01 
5046+200.00  4.32  8.64  10.00  86.42  1,087,320.59 
5046+220.00  4.32  8.64  10.00  86.42  1,087,234.17 
5046+240.00  4.32  8.64  10.00  86.42  1,087,147.75 
5046+260.00  4.32  8.64  10.00  86.42  1,087,061.33 
5046+280.00  4.32  8.64  10.00  86.42  1,086,974.91 
5046+300.00  4.32  8.64  10.00  86.42  1,086,888.49 
5046+320.00  4.32  8.64  10.00  86.42  1,086,802.07 
5046+340.00  4.32  8.64  10.00  86.42  1,086,715.65 
5046+360.00  4.32  8.64  10.00  86.42  1,086,629.23 
5046+380.00  4.32  8.64  10.00  86.42  1,086,542.81 
5046+400.00  4.32  8.64  10.00  86.42  1,086,456.39 
5046+420.00  4.32  8.64  10.00  86.42  1,086,369.97 
5046+440.00  4.32  8.64  10.00  86.42  1,086,283.55 
5046+460.00  4.32  8.64  10.00  86.42  1,086,197.13 
5046+480.00  4.32  8.64  10.00  86.42  1,086,110.71 
5046+500.00  4.32  8.64  10.00  86.42  1,086,024.29 
5046+520.00  4.32  8.64  10.00  86.42  1,085,937.87 
5046+540.00  4.32  8.64  10.00  86.42  1,085,851.45 
5046+560.00  4.32  8.64  10.00  86.42  1,085,765.03 
5046+580.00  4.32  8.64  10.00  86.42  1,085,678.61 
5046+600.00  4.32  8.64  10.00  86.42  1,085,592.19 
5046+620.00  4.32  8.64  10.00  86.42  1,085,505.77 
5046+640.00  4.32  8.64  10.00  86.42  1,085,419.35 
5046+660.00  4.32  8.64  10.00  86.42  1,085,332.93 
5046+680.00  4.32  8.64  10.00  86.42  1,085,246.51 
5046+700.00  4.32  8.64  10.00  86.42  1,085,160.09 
5046+720.00  4.32  8.64  10.00  86.42  1,085,073.67 
5046+740.00  4.32  8.64  10.00  86.42  1,084,987.25 

375 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5046+760.00  4.32  8.64  10.00  86.42  1,084,900.83 


5046+780.00  4.32  8.64  10.00  86.42  1,084,814.41 
5046+800.00  4.32  8.64  10.00  86.42  1,084,727.99 
5046+820.00  4.32  8.64  10.00  86.42  1,084,641.57 
5046+840.00  4.32  8.64  10.00  86.42  1,084,555.15 
5046+860.00  4.32  8.64  10.00  86.42  1,084,468.73 
5046+880.00  4.32  8.64  10.00  86.42  1,084,382.31 
5046+900.00  4.32  8.64  10.00  86.42  1,084,295.89 
5046+920.00  4.32  8.64  10.00  86.42  1,084,209.47 
5046+940.00  4.32  8.64  10.00  86.42  1,084,123.05 
5046+960.00  4.32  8.64  10.00  86.42  1,084,036.63 
5046+980.00  4.32  8.64  10.00  86.42  1,083,950.21 
5047+000.00  4.32  8.64  10.00  86.42  1,083,863.79 
5047+020.00  4.32  8.64  10.00  86.42  1,083,777.37 
5047+040.00  4.32  8.64  10.00  86.42  1,083,690.95 
5047+060.00  4.32  8.64  10.00  86.42  1,083,604.53 
5047+080.00  4.32  8.64  10.00  86.42  1,083,518.11 
5047+100.00  4.32  8.64  10.00  86.42  1,083,431.69 
5047+120.00  4.32  8.64  10.00  86.42  1,083,345.27 
5047+140.00  4.32  8.64  10.00  86.42  1,083,258.85 
5047+160.00  4.32  8.64  10.00  86.42  1,083,172.43 
5047+180.00  4.32  8.64  10.00  86.42  1,083,086.01 
5047+200.00  4.32  8.64  10.00  86.42  1,082,999.59 
5047+220.00  4.32  8.64  10.00  86.42  1,082,913.17 
5047+240.00  4.32  8.64  10.00  86.42  1,082,826.75 
5047+260.00  4.32  8.64  10.00  86.42  1,082,740.33 
5047+280.00  4.32  8.64  10.00  86.42  1,082,653.91 
5047+300.00  4.32  8.64  10.00  86.42  1,082,567.49 
5047+320.00  4.32  8.64  10.00  86.42  1,082,481.07 
5047+340.00  4.32  8.64  10.00  86.42  1,082,394.65 
5047+360.00  4.32  8.64  10.00  86.42  1,082,308.23 
5047+380.00  4.32  8.64  10.00  86.42  1,082,221.81 
5047+400.00  4.32  8.64  10.00  86.42  1,082,135.39 
5047+420.00  4.32  8.64  10.00  86.42  1,082,048.97 
5047+440.00  4.32  8.64  10.00  86.42  1,081,962.55 
5047+460.00  4.32  8.64  10.00  86.42  1,081,876.13 
5047+480.00  4.32  8.64  10.00  86.42  1,081,789.71 
5047+500.00  4.32  8.64  10.00  86.42  1,081,703.29 
5047+520.00  4.32  8.64  10.00  86.42  1,081,616.87 
5047+540.00  4.32  8.64  10.00  86.42  1,081,530.45 
5047+560.00  4.32  8.64  10.00  86.42  1,081,444.03 
5047+580.00  4.32  8.64  10.00  86.42  1,081,357.61 
5047+600.00  4.32  8.64  10.00  86.42  1,081,271.19 
5047+620.00  4.32  8.64  10.00  86.42  1,081,184.77 
5047+640.00  4.32  8.64  10.00  86.42  1,081,098.35 

376 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5047+660.00  4.32  8.64  10.00  86.42  1,081,011.93 


5047+680.00  4.32  8.64  10.00  86.42  1,080,925.51 
5047+700.00  4.32  8.64  10.00  86.42  1,080,839.09 
5047+720.00  4.32  8.64  10.00  86.42  1,080,752.67 
5047+740.00  4.32  8.64  10.00  86.42  1,080,666.25 
5047+760.00  4.32  8.64  10.00  86.42  1,080,579.83 
5047+780.00  4.32  8.64  10.00  86.42  1,080,493.41 
5047+800.00  4.32  8.64  10.00  86.42  1,080,406.99 
5047+820.00  4.32  8.64  10.00  86.42  1,080,320.57 
5047+840.00  4.32  8.64  10.00  86.42  1,080,234.15 
5047+860.00  4.32  8.64  10.00  86.42  1,080,147.73 
5047+880.00  4.32  8.64  10.00  86.42  1,080,061.31 
5047+900.00  4.32  8.64  10.00  86.42  1,079,974.89 
5047+920.00  4.32  8.64  10.00  86.42  1,079,888.47 
5047+940.00  4.32  8.64  10.00  86.42  1,079,802.05 
5047+960.00  4.32  8.64  10.00  86.42  1,079,715.63 
5047+980.00  4.32  8.64  10.00  86.42  1,079,629.21 
5048+000.00  4.32  8.64  10.00  86.42  1,079,542.79 
5048+020.00  4.32  8.64  10.00  86.42  1,079,456.37 
5048+040.00  4.32  8.64  10.00  86.42  1,079,369.95 
5048+060.00  4.32  8.64  10.00  86.42  1,079,283.53 
5048+080.00  4.32  8.64  10.00  86.42  1,079,197.11 
5048+100.00  4.32  8.64  10.00  86.42  1,079,110.69 
5048+120.00  4.32  8.64  10.00  86.42  1,079,024.27 
5048+140.00  4.32  8.64  10.00  86.42  1,078,937.85 
5048+160.00  4.32  8.64  10.00  86.42  1,078,851.43 
5048+180.00  4.32  8.64  10.00  86.42  1,078,765.01 
5048+200.00  4.32  8.64  10.00  86.42  1,078,678.59 
5048+220.00  4.32  8.64  10.00  86.42  1,078,592.17 
5048+240.00  4.32  8.64  10.00  86.42  1,078,505.75 
5048+260.00  4.32  8.64  10.00  86.42  1,078,419.33 
5048+280.00  4.32  8.64  10.00  86.42  1,078,332.91 
5048+300.00  4.32  8.64  10.00  86.42  1,078,246.49 
5048+320.00  4.32  8.64  10.00  86.42  1,078,160.07 
5048+340.00  4.32  8.64  10.00  86.42  1,078,073.65 
5048+360.00  4.32  8.64  10.00  86.42  1,077,987.23 
5048+380.00  4.32  8.64  10.00  86.42  1,077,900.81 
5048+400.00  4.32  8.64  10.00  86.42  1,077,814.39 
5048+420.00  4.32  8.64  10.00  86.42  1,077,727.97 
5048+440.00  4.32  8.64  10.00  86.42  1,077,641.55 
5048+460.00  4.32  8.64  10.00  86.42  1,077,555.13 
5048+480.00  4.32  8.64  10.00  86.42  1,077,468.71 
5048+500.00  4.32  8.64  10.00  86.42  1,077,382.29 
5048+520.00  4.32  8.64  10.00  86.42  1,077,295.87 
5048+540.00  4.32  8.64  10.00  86.42  1,077,209.45 

377 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5048+560.00  4.32  8.64  10.00  86.42  1,077,123.03 


5048+580.00  4.32  8.64  10.00  86.42  1,077,036.61 
5048+600.00  4.32  8.64  10.00  86.42  1,076,950.19 
5048+620.00  4.32  8.64  10.00  86.42  1,076,863.77 
5048+640.00  4.32  8.64  10.00  86.42  1,076,777.35 
5048+660.00  4.32  8.64  10.00  86.42  1,076,690.93 
5048+680.00  4.32  8.64  10.00  86.42  1,076,604.51 
5048+700.00  4.32  8.64  10.00  86.42  1,076,518.09 
5048+720.00  4.32  8.64  10.00  86.42  1,076,431.67 
5048+740.00  4.32  8.64  10.00  86.42  1,076,345.25 
5048+760.00  4.32  8.64  10.00  86.42  1,076,258.83 
5048+780.00  4.32  8.64  10.00  86.42  1,076,172.41 
5048+800.00  4.32  8.64  10.00  86.42  1,076,085.99 
5048+820.00  4.32  8.64  10.00  86.42  1,075,999.57 
5048+840.00  4.32  8.64  10.00  86.42  1,075,913.15 
5048+860.00  4.32  8.64  10.00  86.42  1,075,826.73 
5048+880.00  4.32  8.64  10.00  86.42  1,075,740.31 
5048+900.00  4.32  8.64  10.00  86.42  1,075,653.89 
5048+920.00  4.32  8.64  10.00  86.42  1,075,567.47 
5048+940.00  4.32  8.64  10.00  86.42  1,075,481.05 
5048+960.00  4.32  8.64  10.00  86.42  1,075,394.63 
5048+980.00  4.32  8.64  10.00  86.42  1,075,308.21 
5049+000.00  4.32  8.64  10.00  86.42  1,075,221.79 
5049+020.00  4.32  8.64  10.00  86.42  1,075,135.37 
5049+040.00  4.32  8.64  10.00  86.42  1,075,048.95 
5049+060.00  4.32  8.64  10.00  86.42  1,074,962.53 
5049+080.00  4.32  8.64  10.00  86.42  1,074,876.11 
5049+100.00  4.32  8.64  10.00  86.42  1,074,789.69 
5049+120.00  4.32  8.64  10.00  86.42  1,074,703.27 
5049+140.00  4.32  8.64  10.00  86.42  1,074,616.85 
5049+160.00  4.32  8.64  10.00  86.42  1,074,530.43 
5049+180.00  4.32  8.64  10.00  86.42  1,074,444.01 
5049+200.00  4.32  8.64  10.00  86.42  1,074,357.59 
5049+220.00  4.32  8.64  10.00  86.42  1,074,271.17 
5049+240.00  4.32  8.64  10.00  86.42  1,074,184.75 
5049+260.00  4.32  8.64  10.00  86.42  1,074,098.33 
5049+280.00  4.32  8.64  10.00  86.42  1,074,011.91 
5049+300.00  4.32  8.64  10.00  86.42  1,073,925.49 
5049+320.00  4.32  8.64  10.00  86.42  1,073,839.07 
5049+340.00  4.32  8.64  10.00  86.42  1,073,752.65 
5049+360.00  4.32  8.64  10.00  86.42  1,073,666.23 
5049+380.00  4.32  8.64  10.00  86.42  1,073,579.81 
5049+400.00  4.32  8.64  10.00  86.42  1,073,493.39 
5049+420.00  4.32  8.64  10.00  86.42  1,073,406.97 
5049+440.00  4.32  8.64  10.00  86.42  1,073,320.55 

378 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5049+460.00  4.32  8.64  10.00  86.42  1,073,234.13 


5049+480.00  4.32  8.64  10.00  86.42  1,073,147.71 
5049+500.00  4.32  8.64  10.00  86.42  1,073,061.29 
5049+520.00  4.32  8.64  10.00  86.42  1,072,974.87 
5049+540.00  4.32  8.64  10.00  86.42  1,072,888.45 
5049+560.00  4.32  8.64  10.00  86.42  1,072,802.03 
5049+580.00  4.32  8.64  10.00  86.42  1,072,715.61 
5049+600.00  4.32  8.64  10.00  86.42  1,072,629.19 
5049+620.00  4.32  8.64  10.00  86.42  1,072,542.77 
5049+640.00  4.32  8.64  10.00  86.42  1,072,456.35 
5049+660.00  4.32  8.64  10.00  86.42  1,072,369.93 
5049+680.00  4.32  8.64  10.00  86.42  1,072,283.51 
5049+700.00  4.32  8.64  10.00  86.42  1,072,197.09 
5049+720.00  4.32  8.64  10.00  86.42  1,072,110.67 
5049+740.00  4.32  8.64  10.00  86.42  1,072,024.25 
5049+760.00  4.32  8.64  10.00  86.42  1,071,937.83 
5049+780.00  4.32  8.64  10.00  86.42  1,071,851.41 
5049+800.00  4.32  8.64  10.00  86.42  1,071,764.99 
5049+820.00  4.32  8.64  10.00  86.42  1,071,678.57 
5049+840.00  4.32  8.64  10.00  86.42  1,071,592.15 
5049+860.00  4.32  8.64  10.00  86.42  1,071,505.73 
5049+880.00  4.32  8.64  10.00  86.42  1,071,419.31 
5049+900.00  4.32  8.64  10.00  86.42  1,071,332.89 
5049+920.00  4.32  8.64  10.00  86.42  1,071,246.47 
5049+940.00  4.32  8.64  10.00  86.42  1,071,160.05 
5049+960.00  4.32  8.64  10.00  86.42  1,071,073.63 
5049+980.00  4.32  8.64  10.00  86.42  1,070,987.21 
5050+000.00  4.32  8.64  10.00  86.42  1,070,900.79 
5050+020.00  4.32  8.64  10.00  86.42  1,070,814.37 
5050+040.00  4.32  8.64  10.00  86.42  1,070,727.95 
5050+060.00  4.32  8.64  10.00  86.42  1,070,641.53 
5050+080.00  4.32  8.64  10.00  86.42  1,070,555.11 
5050+100.00  4.32  8.64  10.00  86.42  1,070,468.69 
5050+120.00  4.32  8.64  10.00  86.42  1,070,382.27 
5050+140.00  4.32  8.64  10.00  86.42  1,070,295.85 
5050+160.00  4.32  8.64  10.00  86.42  1,070,209.43 
5050+180.00  4.32  8.64  10.00  86.42  1,070,123.01 
5050+200.00  4.32  8.64  10.00  86.42  1,070,036.59 
5050+220.00  4.32  8.64  10.00  86.42  1,069,950.17 
5050+240.00  4.32  8.64  10.00  86.42  1,069,863.75 
5050+260.00  4.32  8.64  10.00  86.42  1,069,777.33 
5050+280.00  4.32  8.64  10.00  86.42  1,069,690.91 
5050+300.00  4.32  8.64  10.00  86.42  1,069,604.49 
5050+320.00  4.32  8.64  10.00  86.42  1,069,518.07 
5050+340.00  4.32  8.64  10.00  86.42  1,069,431.65 

379 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5043+000 al 5051+000  

5050+360.00  4.32  8.64  10.00  86.42  1,069,345.23 


5050+380.00  4.32  8.64  10.00  86.42  1,069,258.81 
5050+400.00  4.32  8.64  10.00  86.42  1,069,172.39 
5050+420.00  4.32  8.64  10.00  86.42  1,069,085.97 
5050+440.00  4.32  8.64  10.00  86.42  1,068,999.55 
5050+460.00  4.32  8.64  10.00  86.42  1,068,913.13 
5050+480.00  4.32  8.64  10.00  86.42  1,068,826.71 
5050+500.00  4.32  8.64  10.00  86.42  1,068,740.29 
5050+520.00  4.32  8.64  10.00  86.42  1,068,653.87 
5050+540.00  4.32  8.64  10.00  86.42  1,068,567.45 
5050+560.00  4.32  8.64  10.00  86.42  1,068,481.03 
5050+580.00  4.32  8.64  10.00  86.42  1,068,394.61 
5050+600.00  4.32  8.64  10.00  86.42  1,068,308.19 
5050+620.00  4.32  8.64  10.00  86.42  1,068,221.77 
5050+640.00  4.32  8.64  10.00  86.42  1,068,135.35 
5050+660.00  4.32  8.64  10.00  86.42  1,068,048.93 
5050+680.00  4.32  8.64  10.00  86.42  1,067,962.51 
5050+700.00  4.32  8.64  10.00  86.42  1,067,876.09 
5050+720.00  4.32  8.64  10.00  86.42  1,067,789.67 
5050+740.00  4.32  8.64  10.00  86.42  1,067,703.25 
5050+760.00  4.32  8.64  10.00  86.42  1,067,616.83 
5050+780.00  4.32  8.64  10.00  86.42  1,067,530.41 
5050+800.00  4.32  8.64  10.00  86.42  1,067,443.99 
5050+820.00  4.32  8.64  10.00  86.42  1,067,357.57 
5050+840.00  4.32  8.64  10.00  86.42  1,067,271.15 
5050+860.00  4.32  8.64  10.00  86.42  1,067,184.73 
5050+880.00  4.32  8.64  10.00  86.42  1,067,098.31 
5050+900.00  4.32  8.64  10.00  86.42  1,067,011.89 
5050+920.00  4.32  8.64  10.00  86.42  1,066,925.47 
5050+940.00  4.32  8.64  10.00  86.42  1,066,839.05 
5050+960.00  4.32  8.64  10.00  86.42  1,066,752.63 
5050+980.00  4.32  8.64  10.00  86.42  1,066,666.21 
5051+000.00  4.32  8.64  10.00  86.42  1,066,579.79 
 

TABLA 32 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 5051+000 – 5070+000 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5051+000.00  4.32  4.32        1,066,596.82 


5051+020.00  4.32  8.64  10.00  86.42  1,066,510.40 
5051+040.00  4.32  8.64  10.00  86.42  1,066,423.98 

380 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5051+060.00  4.32  8.64  10.00  86.42  1,066,337.56 


5051+080.00  4.32  8.64  10.00  86.42  1,066,251.14 
5051+100.00  4.32  8.64  10.00  86.42  1,066,164.72 
5051+120.00  4.32  8.64  10.00  86.42  1,066,078.30 
5051+140.00  4.32  8.64  10.00  86.42  1,065,991.88 
5051+160.00  4.32  8.64  10.00  86.42  1,065,905.46 
5051+180.00  4.32  8.64  10.00  86.42  1,065,819.04 
5051+200.00  4.32  8.64  10.00  86.42  1,065,732.62 
5051+220.00  4.32  8.64  10.00  86.42  1,065,646.20 
5051+240.00  4.32  8.64  10.00  86.42  1,065,559.78 
5051+260.00  4.32  8.64  10.00  86.42  1,065,473.36 
5051+280.00  4.32  8.64  10.00  86.42  1,065,386.94 
5051+300.00  4.32  8.64  10.00  86.42  1,065,300.52 
5051+320.00  4.32  8.64  10.00  86.42  1,065,214.10 
5051+340.00  4.32  8.64  10.00  86.42  1,065,127.68 
5051+360.00  4.32  8.64  10.00  86.42  1,065,041.26 
5051+380.00  4.32  8.64  10.00  86.42  1,064,954.84 
5051+400.00  4.32  8.64  10.00  86.42  1,064,868.42 
5051+420.00  4.32  8.64  10.00  86.42  1,064,782.00 
5051+440.00  4.32  8.64  10.00  86.42  1,064,695.58 
5051+460.00  4.32  8.64  10.00  86.42  1,064,609.16 
5051+480.00  4.32  8.64  10.00  86.42  1,064,522.74 
5051+500.00  4.32  8.64  10.00  86.42  1,064,436.32 
5051+520.00  4.32  8.64  10.00  86.42  1,064,349.90 
5051+540.00  4.32  8.64  10.00  86.42  1,064,263.48 
5051+560.00  4.32  8.64  10.00  86.42  1,064,177.06 
5051+580.00  4.32  8.64  10.00  86.42  1,064,090.64 
5051+600.00  4.32  8.64  10.00  86.42  1,064,004.22 
5051+620.00  4.32  8.64  10.00  86.42  1,063,917.80 
5051+640.00  4.32  8.64  10.00  86.42  1,063,831.38 
5051+660.00  4.32  8.64  10.00  86.42  1,063,744.96 
5051+680.00  4.32  8.64  10.00  86.42  1,063,658.54 
5051+700.00  4.32  8.64  10.00  86.42  1,063,572.12 
5051+720.00  4.32  8.64  10.00  86.42  1,063,485.70 
5051+740.00  4.32  8.64  10.00  86.42  1,063,399.28 
5051+760.00  4.32  8.64  10.00  86.42  1,063,312.86 
5051+780.00  4.32  8.64  10.00  86.42  1,063,226.44 
5051+800.00  4.32  8.64  10.00  86.42  1,063,140.02 
5051+820.00  4.32  8.64  10.00  86.42  1,063,053.60 
5051+840.00  4.32  8.64  10.00  86.42  1,062,967.18 
5051+860.00  4.32  8.64  10.00  86.42  1,062,880.76 
5051+880.00  4.32  8.64  10.00  86.42  1,062,794.34 
5051+900.00  4.32  8.64  10.00  86.42  1,062,707.92 
5051+920.00  4.32  8.64  10.00  86.42  1,062,621.50 
5051+940.00  4.32  8.64  10.00  86.42  1,062,535.08 

381 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5051+960.00  4.32  8.64  10.00  86.42  1,062,448.66 


5051+980.00  4.32  8.64  10.00  86.42  1,062,362.24 
5052+000.00  4.32  8.64  10.00  86.42  1,062,275.82 
5052+020.00  4.32  8.64  10.00  86.42  1,062,189.40 
5052+040.00  4.32  8.64  10.00  86.42  1,062,102.98 
5052+060.00  4.32  8.64  10.00  86.42  1,062,016.56 
5052+080.00  4.32  8.64  10.00  86.42  1,061,930.14 
5052+100.00  4.32  8.64  10.00  86.42  1,061,843.72 
5052+120.00  4.32  8.64  10.00  86.42  1,061,757.30 
5052+140.00  4.32  8.64  10.00  86.42  1,061,670.88 
5052+160.00  4.32  8.64  10.00  86.42  1,061,584.46 
5052+180.00  4.32  8.64  10.00  86.42  1,061,498.04 
5052+200.00  4.32  8.64  10.00  86.42  1,061,411.62 
5052+220.00  4.32  8.64  10.00  86.42  1,061,325.20 
5052+240.00  4.32  8.64  10.00  86.42  1,061,238.78 
5052+260.00  4.32  8.64  10.00  86.42  1,061,152.36 
5052+280.00  4.32  8.64  10.00  86.42  1,061,065.94 
5052+300.00  4.32  8.64  10.00  86.42  1,060,979.52 
5052+320.00  4.32  8.64  10.00  86.42  1,060,893.10 
5052+340.00  4.32  8.64  10.00  86.42  1,060,806.68 
5052+360.00  4.32  8.64  10.00  86.42  1,060,720.26 
5052+380.00  4.32  8.64  10.00  86.42  1,060,633.84 
5052+400.00  4.32  8.64  10.00  86.42  1,060,547.42 
5052+420.00  4.32  8.64  10.00  86.42  1,060,461.00 
5052+440.00  4.32  8.64  10.00  86.42  1,060,374.58 
5052+460.00  4.32  8.64  10.00  86.42  1,060,288.16 
5052+480.00  4.32  8.64  10.00  86.42  1,060,201.74 
5052+500.00  4.32  8.64  10.00  86.42  1,060,115.32 
5052+520.00  4.32  8.64  10.00  86.42  1,060,028.90 
5052+540.00  4.32  8.64  10.00  86.42  1,059,942.48 
5052+560.00  4.32  8.64  10.00  86.42  1,059,856.06 
5052+580.00  4.32  8.64  10.00  86.42  1,059,769.64 
5052+600.00  4.32  8.64  10.00  86.42  1,059,683.22 
5052+620.00  4.32  8.64  10.00  86.42  1,059,596.80 
5052+640.00  4.32  8.64  10.00  86.42  1,059,510.38 
5052+660.00  4.32  8.64  10.00  86.42  1,059,423.96 
5052+680.00  4.32  8.64  10.00  86.42  1,059,337.54 
5052+700.00  4.32  8.64  10.00  86.42  1,059,251.12 
5052+720.00  4.32  8.64  10.00  86.42  1,059,164.70 
5052+740.00  4.32  8.64  10.00  86.42  1,059,078.28 
5052+760.00  4.32  8.64  10.00  86.42  1,058,991.86 
5052+780.00  4.32  8.64  10.00  86.42  1,058,905.44 
5052+800.00  4.32  8.64  10.00  86.42  1,058,819.02 
5052+820.00  4.32  8.64  10.00  86.42  1,058,732.60 
5052+840.00  4.32  8.64  10.00  86.42  1,058,646.18 

382 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5052+860.00  4.32  8.64  10.00  86.42  1,058,559.76 


5052+880.00  4.32  8.64  10.00  86.42  1,058,473.34 
5052+900.00  4.32  8.64  10.00  86.42  1,058,386.92 
5052+920.00  4.32  8.64  10.00  86.42  1,058,300.50 
5052+940.00  4.32  8.64  10.00  86.42  1,058,214.08 
5052+960.00  4.32  8.64  10.00  86.42  1,058,127.66 
5052+980.00  4.32  8.64  10.00  86.42  1,058,041.24 
5053+000.00  4.32  8.64  10.00  86.42  1,057,954.82 
5053+020.00  4.32  8.64  10.00  86.42  1,057,868.40 
5053+040.00  0.00  4.32  10.00  43.21  1,057,825.19 
5053+060.00  0.00  0.00  10.00  0.00  1,057,825.19 
5053+080.00  0.00  0.00  10.00  0.00  1,057,825.19 
5053+100.00  0.00  0.00  10.00  0.00  1,057,825.19 
5053+120.00  4.32  4.32  10.00  43.21  1,057,781.98 
5053+140.00  4.32  8.64  10.00  86.42  1,057,695.56 
5053+160.00  4.32  8.64  10.00  86.42  1,057,609.14 
5053+180.00  4.32  8.64  10.00  86.42  1,057,522.72 
5053+200.00  4.32  8.64  10.00  86.42  1,057,436.30 
5053+220.00  4.32  8.64  10.00  86.42  1,057,349.88 
5053+240.00  4.32  8.64  10.00  86.42  1,057,263.46 
5053+260.00  4.32  8.64  10.00  86.42  1,057,177.04 
5053+280.00  4.32  8.64  10.00  86.42  1,057,090.62 
5053+300.00  4.32  8.64  10.00  86.42  1,057,004.20 
5053+320.00  4.32  8.64  10.00  86.42  1,056,917.78 
5053+340.00  4.32  8.64  10.00  86.42  1,056,831.36 
5053+360.00  4.32  8.64  10.00  86.42  1,056,744.94 
5053+380.00  4.32  8.64  10.00  86.42  1,056,658.52 
5053+400.00  4.32  8.64  10.00  86.42  1,056,572.10 
5053+420.00  4.32  8.64  10.00  86.42  1,056,485.68 
5053+440.00  4.32  8.64  10.00  86.42  1,056,399.26 
5053+460.00  4.32  8.64  10.00  86.42  1,056,312.84 
5053+480.00  4.32  8.64  10.00  86.42  1,056,226.42 
5053+500.00  4.32  8.64  10.00  86.42  1,056,140.00 
5053+520.00  4.32  8.64  10.00  86.43  1,056,053.57 
5053+540.00  4.32  8.64  10.00  86.44  1,055,967.13 
5053+560.00  4.32  8.64  10.00  86.43  1,055,880.70 
5053+580.00  0.00  4.32  10.00  43.21  1,055,837.49 
5053+600.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+620.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+640.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+660.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+680.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+700.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+720.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+740.00  0.00  0.00  10.00  0.00  1,055,837.49 

383 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5053+760.00  0.00  0.00  10.00  0.00  1,055,837.49 


5053+780.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+800.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+820.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+840.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+860.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+880.00  0.00  0.00  10.00  0.00  1,055,837.49 
5053+900.00  3.39  3.39  10.00  33.92  1,055,803.57 
5053+920.00  3.39  6.78  10.00  67.84  1,055,735.73 
5053+940.00  3.39  6.79  10.00  67.85  1,055,667.88 
5053+960.00  3.39  6.79  10.00  67.85  1,055,600.03 
5053+980.00  3.39  6.78  10.00  67.84  1,055,532.19 
5054+000.00  3.39  6.79  10.00  67.85  1,055,464.34 
5054+020.00  3.39  6.79  10.00  67.86  1,055,396.48 
5054+040.00  3.39  6.79  10.00  67.86  1,055,328.62 
5054+060.00  3.39  6.79  10.00  67.86  1,055,260.76 
5054+080.00  3.39  6.79  10.00  67.86  1,055,192.90 
5054+100.00  3.39  6.79  10.00  67.86  1,055,125.04 
5054+120.00  3.39  6.79  10.00  67.86  1,055,057.18 
5054+140.00  3.39  6.79  10.00  67.86  1,054,989.32 
5054+160.00  3.39  6.79  10.00  67.86  1,054,921.46 
5054+180.00  3.39  6.79  10.00  67.86  1,054,853.60 
5054+200.00  3.39  6.79  10.00  67.86  1,054,785.74 
5054+220.00  3.39  6.79  10.00  67.86  1,054,717.88 
5054+240.00  3.39  6.79  10.00  67.86  1,054,650.02 
5054+260.00  3.39  6.79  10.00  67.87  1,054,582.15 
5054+280.00  3.39  6.79  10.00  67.88  1,054,514.27 
5054+300.00  3.39  6.79  10.00  67.88  1,054,446.39 
5054+320.00  3.39  6.79  10.00  67.88  1,054,378.51 
5054+340.00  3.39  6.79  10.00  67.88  1,054,310.63 
5054+360.00  3.39  6.79  10.00  67.88  1,054,242.75 
5054+380.00  3.39  6.79  10.00  67.88  1,054,174.87 
5054+400.00  3.39  6.79  10.00  67.88  1,054,106.99 
5054+420.00  3.40  6.79  10.00  67.89  1,054,039.10 
5054+440.00  3.40  6.79  10.00  67.90  1,053,971.20 
5054+460.00  3.40  6.79  10.00  67.90  1,053,903.30 
5054+480.00  3.40  6.79  10.00  67.90  1,053,835.40 
5054+500.00  3.40  6.79  10.00  67.91  1,053,767.49 
5054+520.00  3.40  6.79  10.00  67.93  1,053,699.56 
5054+540.00  3.48  6.88  10.00  68.76  1,053,630.80 
5054+560.00  3.50  6.98  10.00  69.82  1,053,560.98 
5054+580.00  3.52  7.02  10.00  70.18  1,053,490.80 
5054+600.00  3.39  6.91  10.00  69.06  1,053,421.74 
5054+620.00  3.39  6.78  10.00  67.83  1,053,353.91 
5054+640.00  3.39  6.78  10.00  67.84  1,053,286.07 

384 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5054+660.00  3.39  6.78  10.00  67.83  1,053,218.24 


5054+680.00  3.39  6.78  10.00  67.83  1,053,150.41 
5054+700.00  3.39  6.78  10.00  67.84  1,053,082.57 
5054+720.00  3.39  6.78  10.00  67.84  1,053,014.73 
5054+740.00  3.39  6.78  10.00  67.84  1,052,946.89 
5054+760.00  3.52  6.91  10.00  69.08  1,052,877.81 
5054+780.00  3.52  7.03  10.00  70.32  1,052,807.49 
5054+800.00  3.45  6.97  10.00  69.70  1,052,737.79 
5054+820.00  3.44  6.90  10.00  68.98  1,052,668.81 
5054+840.00  3.40  6.84  10.00  68.41  1,052,600.40 
5054+860.00  3.40  6.79  10.00  67.93  1,052,532.47 
5054+880.00  3.40  6.79  10.00  67.91  1,052,464.56 
5054+900.00  3.40  6.79  10.00  67.90  1,052,396.66 
5054+920.00  3.40  6.79  10.00  67.90  1,052,328.76 
5054+940.00  3.40  6.79  10.00  67.90  1,052,260.86 
5054+960.00  3.40  6.79  10.00  67.90  1,052,192.96 
5054+980.00  3.40  6.79  10.00  67.90  1,052,125.06 
5055+000.00  3.40  6.79  10.00  67.90  1,052,057.16 
5055+020.00  3.40  6.79  10.00  67.90  1,051,989.26 
5055+040.00  3.40  6.79  10.00  67.91  1,051,921.35 
5055+060.00  3.40  6.79  10.00  67.92  1,051,853.43 
5055+080.00  3.40  6.79  10.00  67.92  1,051,785.51 
5055+100.00  3.40  6.79  10.00  67.94  1,051,717.57 
5055+120.00  3.45  6.85  10.00  68.45  1,051,649.12 
5055+140.00  3.45  6.89  10.00  68.94  1,051,580.18 
5055+160.00  3.45  6.90  10.00  69.00  1,051,511.18 
5055+180.00  3.45  6.91  10.00  69.06  1,051,442.12 
5055+200.00  3.45  6.91  10.00  69.06  1,051,373.06 
5055+220.00  3.51  6.96  10.00  69.60  1,051,303.46 
5055+240.00  3.51  7.01  10.00  70.14  1,051,233.32 
5055+260.00  3.51  7.01  10.00  70.14  1,051,163.18 
5055+280.00  3.51  7.01  10.00  70.14  1,051,093.04 
5055+300.00  3.51  7.01  10.00  70.14  1,051,022.90 
5055+320.00  3.46  6.97  10.00  69.65  1,050,953.25 
5055+340.00  3.45  6.91  10.00  69.10  1,050,884.15 
5055+360.00  3.44  6.89  10.00  68.93  1,050,815.22 
5055+380.00  3.45  6.89  10.00  68.89  1,050,746.33 
5055+400.00  3.45  6.90  10.00  68.96  1,050,677.37 
5055+420.00  3.45  6.90  10.00  68.96  1,050,608.41 
5055+440.00  3.45  6.90  10.00  68.96  1,050,539.45 
5055+460.00  3.45  6.90  10.00  68.96  1,050,470.49 
5055+480.00  3.46  6.91  10.00  69.08  1,050,401.41 
5055+500.00  3.45  6.91  10.00  69.09  1,050,332.32 
5055+520.00  3.45  6.90  10.00  68.97  1,050,263.35 
5055+540.00  3.44  6.89  10.00  68.85  1,050,194.50 

385 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5055+560.00  3.43  6.87  10.00  68.65  1,050,125.85 


5055+580.00  3.41  6.83  10.00  68.33  1,050,057.52 
5055+600.00  3.40  6.80  10.00  68.02  1,049,989.50 
5055+620.00  3.40  6.79  10.00  67.94  1,049,921.56 
5055+640.00  3.40  6.79  10.00  67.94  1,049,853.62 
5055+660.00  3.40  6.79  10.00  67.94  1,049,785.68 
5055+680.00  3.40  6.79  10.00  67.94  1,049,717.74 
5055+700.00  3.40  6.79  10.00  67.94  1,049,649.80 
5055+720.00  3.40  6.79  10.00  67.94  1,049,581.86 
5055+740.00  3.40  6.79  10.00  67.93  1,049,513.93 
5055+760.00  3.40  6.79  10.00  67.92  1,049,446.01 
5055+780.00  3.40  6.79  10.00  67.92  1,049,378.09 
5055+800.00  3.40  6.79  10.00  67.92  1,049,310.17 
5055+820.00  3.40  6.79  10.00  67.92  1,049,242.25 
5055+840.00  3.40  6.79  10.00  67.92  1,049,174.33 
5055+860.00  3.40  6.79  10.00  67.92  1,049,106.41 
5055+880.00  3.40  6.79  10.00  67.92  1,049,038.49 
5055+900.00  3.40  6.79  10.00  67.91  1,048,970.58 
5055+920.00  3.40  6.79  10.00  67.90  1,048,902.68 
5055+940.00  3.40  6.79  10.00  67.90  1,048,834.78 
5055+960.00  3.40  6.79  10.00  67.90  1,048,766.88 
5055+980.00  3.40  6.79  10.00  67.90  1,048,698.98 
5056+000.00  3.40  6.79  10.00  67.90  1,048,631.08 
5056+020.00  3.40  6.79  10.00  67.90  1,048,563.18 
5056+040.00  3.40  6.79  10.00  67.90  1,048,495.28 
5056+060.00  3.40  6.79  10.00  67.90  1,048,427.38 
5056+080.00  3.40  6.79  10.00  67.90  1,048,359.48 
5056+100.00  3.40  6.79  10.00  67.90  1,048,291.58 
5056+120.00  3.40  6.79  10.00  67.91  1,048,223.67 
5056+140.00  3.40  6.79  10.00  67.92  1,048,155.75 
5056+160.00  3.40  6.79  10.00  67.92  1,048,087.83 
5056+180.00  3.40  6.79  10.00  67.92  1,048,019.91 
5056+200.00  3.40  6.79  10.00  67.93  1,047,951.98 
5056+220.00  3.40  6.79  10.00  67.94  1,047,884.04 
5056+240.00  3.40  6.79  10.00  67.94  1,047,816.10 
5056+260.00  3.41  6.81  10.00  68.09  1,047,748.01 
5056+280.00  3.44  6.85  10.00  68.50  1,047,679.51 
5056+300.00  3.45  6.88  10.00  68.84  1,047,610.67 
5056+320.00  3.46  6.90  10.00  69.02  1,047,541.65 
5056+340.00  3.46  6.92  10.00  69.16  1,047,472.49 
5056+360.00  3.47  6.93  10.00  69.32  1,047,403.17 
5056+380.00  3.47  6.94  10.00  69.44  1,047,333.73 
5056+400.00  3.51  6.98  10.00  69.78  1,047,263.95 
5056+420.00  3.49  7.00  10.00  70.00  1,047,193.95 
5056+440.00  3.48  6.97  10.00  69.73  1,047,124.22 

386 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5056+460.00  3.47  6.95  10.00  69.46  1,047,054.76 


5056+480.00  3.45  6.92  10.00  69.21  1,046,985.55 
5056+500.00  3.46  6.91  10.00  69.09  1,046,916.46 
5056+520.00  3.46  6.91  10.00  69.10  1,046,847.36 
5056+540.00  3.46  6.91  10.00  69.11  1,046,778.25 
5056+560.00  3.45  6.91  10.00  69.08  1,046,709.17 
5056+580.00  3.41  6.86  10.00  68.62  1,046,640.55 
5056+600.00  3.40  6.81  10.00  68.07  1,046,572.48 
5056+620.00  3.40  6.79  10.00  67.94  1,046,504.54 
5056+640.00  3.40  6.79  10.00  67.94  1,046,436.60 
5056+660.00  3.40  6.79  10.00  67.94  1,046,368.66 
5056+680.00  3.40  6.79  10.00  67.93  1,046,300.73 
5056+700.00  3.40  6.79  10.00  67.92  1,046,232.81 
5056+720.00  3.40  6.79  10.00  67.92  1,046,164.89 
5056+740.00  3.40  6.79  10.00  67.92  1,046,096.97 
5056+760.00  3.40  6.79  10.00  67.92  1,046,029.05 
5056+780.00  3.40  6.79  10.00  67.92  1,045,961.13 
5056+800.00  3.40  6.79  10.00  67.91  1,045,893.22 
5056+820.00  3.40  6.79  10.00  67.90  1,045,825.32 
5056+840.00  3.40  6.79  10.00  67.91  1,045,757.41 
5056+860.00  3.40  6.79  10.00  67.92  1,045,689.49 
5056+880.00  3.40  6.79  10.00  67.92  1,045,621.57 
5056+900.00  3.40  6.79  10.00  67.92  1,045,553.65 
5056+920.00  3.40  6.79  10.00  67.92  1,045,485.73 
5056+940.00  3.40  6.79  10.00  67.92  1,045,417.81 
5056+960.00  3.40  6.79  10.00  67.92  1,045,349.89 
5056+980.00  3.40  6.79  10.00  67.92  1,045,281.97 
5057+000.00  3.40  6.79  10.00  67.92  1,045,214.05 
5057+020.00  3.40  6.79  10.00  67.92  1,045,146.13 
5057+040.00  3.40  6.79  10.00  67.93  1,045,078.20 
5057+060.00  3.40  6.79  10.00  67.94  1,045,010.26 
5057+080.00  3.41  6.81  10.00  68.11  1,044,942.15 
5057+100.00  3.44  6.86  10.00  68.56  1,044,873.59 
5057+120.00  3.51  6.95  10.00  69.52  1,044,804.07 
5057+140.00  3.54  7.05  10.00  70.49  1,044,733.58 
5057+160.00  3.52  7.06  10.00  70.58  1,044,663.00 
5057+180.00  3.50  7.02  10.00  70.18  1,044,592.82 
5057+200.00  3.47  6.97  10.00  69.72  1,044,523.10 
5057+220.00  3.48  6.95  10.00  69.48  1,044,453.62 
5057+240.00  3.47  6.95  10.00  69.48  1,044,384.14 
5057+260.00  3.47  6.95  10.00  69.46  1,044,314.68 
5057+280.00  3.44  6.92  10.00  69.17  1,044,245.51 
5057+300.00  3.42  6.86  10.00  68.64  1,044,176.87 
5057+320.00  3.40  6.82  10.00  68.17  1,044,108.70 
5057+340.00  3.40  6.79  10.00  67.93  1,044,040.77 

387 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5057+360.00  3.40  6.79  10.00  67.92  1,043,972.85 


5057+380.00  3.40  6.79  10.00  67.92  1,043,904.93 
5057+400.00  3.40  6.79  10.00  67.92  1,043,837.01 
5057+420.00  3.40  6.79  10.00  67.92  1,043,769.09 
5057+440.00  3.40  6.79  10.00  67.91  1,043,701.18 
5057+460.00  3.40  6.79  10.00  67.90  1,043,633.28 
5057+480.00  3.40  6.79  10.00  67.90  1,043,565.38 
5057+500.00  3.40  6.79  10.00  67.91  1,043,497.47 
5057+520.00  3.40  6.79  10.00  67.92  1,043,429.55 
5057+540.00  3.40  6.79  10.00  67.92  1,043,361.63 
5057+560.00  3.40  6.79  10.00  67.92  1,043,293.71 
5057+580.00  3.40  6.79  10.00  67.92  1,043,225.79 
5057+600.00  3.40  6.79  10.00  67.93  1,043,157.86 
5057+620.00  3.40  6.79  10.00  67.94  1,043,089.92 
5057+640.00  3.40  6.79  10.00  67.93  1,043,021.99 
5057+660.00  3.40  6.79  10.00  67.93  1,042,954.06 
5057+680.00  3.40  6.79  10.00  67.94  1,042,886.12 
5057+700.00  3.40  6.79  10.00  67.94  1,042,818.18 
5057+720.00  3.40  6.79  10.00  67.94  1,042,750.24 
5057+740.00  3.40  6.79  10.00  67.94  1,042,682.30 
5057+760.00  3.40  6.79  10.00  67.94  1,042,614.36 
5057+780.00  3.40  6.79  10.00  67.94  1,042,546.42 
5057+800.00  3.40  6.79  10.00  67.94  1,042,478.48 
5057+820.00  3.40  6.79  10.00  67.94  1,042,410.54 
5057+840.00  3.40  6.79  10.00  67.93  1,042,342.61 
5057+860.00  3.40  6.79  10.00  67.92  1,042,274.69 
5057+880.00  3.40  6.79  10.00  67.92  1,042,206.77 
5057+900.00  3.40  6.79  10.00  67.92  1,042,138.85 
5057+920.00  3.40  6.79  10.00  67.91  1,042,070.94 
5057+940.00  3.40  6.79  10.00  67.90  1,042,003.04 
5057+960.00  3.40  6.79  10.00  67.90  1,041,935.14 
5057+980.00  3.40  6.79  10.00  67.90  1,041,867.24 
5058+000.00  3.40  6.79  10.00  67.90  1,041,799.34 
5058+020.00  3.40  6.79  10.00  67.90  1,041,731.44 
5058+040.00  3.40  6.79  10.00  67.91  1,041,663.53 
5058+060.00  3.40  6.79  10.00  67.92  1,041,595.61 
5058+080.00  3.40  6.79  10.00  67.92  1,041,527.69 
5058+100.00  3.40  6.79  10.00  67.92  1,041,459.77 
5058+120.00  3.40  6.79  10.00  67.92  1,041,391.85 
5058+140.00  3.40  6.79  10.00  67.92  1,041,323.93 
5058+160.00  3.40  6.79  10.00  67.92  1,041,256.01 
5058+180.00  3.40  6.79  10.00  67.92  1,041,188.09 
5058+200.00  3.40  6.79  10.00  67.93  1,041,120.16 
5058+220.00  3.40  6.79  10.00  67.94  1,041,052.22 
5058+240.00  3.40  6.79  10.00  67.94  1,040,984.28 

388 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5058+260.00  3.40  6.79  10.00  67.94  1,040,916.34 


5058+280.00  3.40  6.79  10.00  67.93  1,040,848.41 
5058+300.00  3.40  6.79  10.00  67.93  1,040,780.48 
5058+320.00  3.40  6.79  10.00  67.94  1,040,712.54 
5058+340.00  3.40  6.79  10.00  67.93  1,040,644.61 
5058+360.00  3.40  6.79  10.00  67.92  1,040,576.69 
5058+380.00  3.40  6.79  10.00  67.93  1,040,508.76 
5058+400.00  3.40  6.79  10.00  67.93  1,040,440.83 
5058+420.00  3.40  6.79  10.00  67.92  1,040,372.91 
5058+440.00  3.40  6.79  10.00  67.92  1,040,304.99 
5058+460.00  3.40  6.79  10.00  67.93  1,040,237.06 
5058+480.00  3.40  6.79  10.00  67.94  1,040,169.12 
5058+500.00  3.41  6.81  10.00  68.07  1,040,101.05 
5058+520.00  3.43  6.84  10.00  68.42  1,040,032.63 
5058+540.00  3.45  6.88  10.00  68.82  1,039,963.81 
5058+560.00  3.47  6.92  10.00  69.16  1,039,894.65 
5058+580.00  3.47  6.93  10.00  69.33  1,039,825.32 
5058+600.00  3.45  6.92  10.00  69.19  1,039,756.13 
5058+620.00  3.46  6.91  10.00  69.12  1,039,687.01 
5058+640.00  3.46  6.92  10.00  69.22  1,039,617.79 
5058+660.00  3.44  6.90  10.00  68.99  1,039,548.80 
5058+680.00  3.43  6.87  10.00  68.71  1,039,480.09 
5058+700.00  3.41  6.84  10.00  68.43  1,039,411.66 
5058+720.00  3.39  6.80  10.00  68.00  1,039,343.66 
5058+740.00  3.40  6.79  10.00  67.88  1,039,275.78 
5058+760.00  3.40  6.79  10.00  67.94  1,039,207.84 
5058+780.00  3.40  6.79  10.00  67.94  1,039,139.90 
5058+800.00  3.40  6.79  10.00  67.94  1,039,071.96 
5058+820.00  3.40  6.79  10.00  67.94  1,039,004.02 
5058+840.00  3.40  6.79  10.00  67.94  1,038,936.08 
5058+860.00  3.40  6.79  10.00  67.94  1,038,868.14 
5058+880.00  3.40  6.79  10.00  67.94  1,038,800.20 
5058+900.00  3.40  6.79  10.00  67.94  1,038,732.26 
5058+920.00  3.40  6.79  10.00  67.94  1,038,664.32 
5058+940.00  3.40  6.79  10.00  67.94  1,038,596.38 
5058+960.00  3.40  6.79  10.00  67.94  1,038,528.44 
5058+980.00  3.40  6.80  10.00  67.95  1,038,460.49 
5059+000.00  3.40  6.80  10.00  67.95  1,038,392.54 
5059+020.00  3.40  6.79  10.00  67.94  1,038,324.60 
5059+040.00  3.40  6.79  10.00  67.94  1,038,256.66 
5059+060.00  3.40  6.79  10.00  67.94  1,038,188.72 
5059+080.00  3.41  6.81  10.00  68.06  1,038,120.66 
5059+100.00  3.40  6.81  10.00  68.13  1,038,052.53 
5059+120.00  3.40  6.81  10.00  68.06  1,037,984.47 
5059+140.00  3.41  6.81  10.00  68.08  1,037,916.39 

389 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5059+160.00  3.41  6.81  10.00  68.13  1,037,848.26 


5059+180.00  3.41  6.82  10.00  68.17  1,037,780.09 
5059+200.00  3.42  6.83  10.00  68.32  1,037,711.77 
5059+220.00  3.44  6.86  10.00  68.57  1,037,643.20 
5059+240.00  3.43  6.87  10.00  68.68  1,037,574.52 
5059+260.00  3.44  6.87  10.00  68.72  1,037,505.80 
5059+280.00  3.46  6.90  10.00  69.02  1,037,436.78 
5059+300.00  3.47  6.93  10.00  69.28  1,037,367.50 
5059+320.00  3.46  6.93  10.00  69.28  1,037,298.22 
5059+340.00  3.47  6.94  10.00  69.35  1,037,228.87 
5059+360.00  3.49  6.96  10.00  69.58  1,037,159.29 
5059+380.00  3.49  6.97  10.00  69.72  1,037,089.57 
5059+400.00  3.49  6.97  10.00  69.71  1,037,019.86 
5059+420.00  3.48  6.96  10.00  69.64  1,036,950.22 
5059+440.00  3.47  6.95  10.00  69.51  1,036,880.71 
5059+460.00  3.49  6.96  10.00  69.62  1,036,811.09 
5059+480.00  3.49  6.98  10.00  69.83  1,036,741.26 
5059+500.00  3.47  6.97  10.00  69.65  1,036,671.61 
5059+520.00  3.47  6.94  10.00  69.37  1,036,602.24 
5059+540.00  3.47  6.93  10.00  69.31  1,036,532.93 
5059+560.00  3.46  6.93  10.00  69.28  1,036,463.65 
5059+580.00  3.46  6.92  10.00  69.18  1,036,394.47 
5059+600.00  3.43  6.88  10.00  68.82  1,036,325.65 
5059+620.00  3.40  6.83  10.00  68.30  1,036,257.35 
5059+640.00  3.40  6.80  10.00  68.01  1,036,189.34 
5059+660.00  3.40  6.79  10.00  67.94  1,036,121.40 
5059+680.00  3.40  6.79  10.00  67.93  1,036,053.47 
5059+700.00  3.40  6.79  10.00  67.92  1,035,985.55 
5059+720.00  3.40  6.79  10.00  67.92  1,035,917.63 
5059+740.00  3.40  6.79  10.00  67.92  1,035,849.71 
5059+760.00  3.40  6.79  10.00  67.92  1,035,781.79 
5059+780.00  3.40  6.79  10.00  67.92  1,035,713.87 
5059+800.00  3.40  6.79  10.00  67.92  1,035,645.95 
5059+820.00  3.40  6.79  10.00  67.92  1,035,578.03 
5059+840.00  3.40  6.79  10.00  67.92  1,035,510.11 
5059+860.00  3.40  6.79  10.00  67.92  1,035,442.19 
5059+880.00  3.40  6.79  10.00  67.92  1,035,374.27 
5059+900.00  3.40  6.79  10.00  67.93  1,035,306.34 
5059+920.00  3.40  6.79  10.00  67.94  1,035,238.40 
5059+940.00  3.40  6.79  10.00  67.94  1,035,170.46 
5059+960.00  3.40  6.79  10.00  67.94  1,035,102.52 
5059+980.00  3.40  6.79  10.00  67.94  1,035,034.58 
5060+000.00  3.40  6.79  10.00  67.94  1,034,966.64 
5060+020.00  3.40  6.79  10.00  67.94  1,034,898.70 
5060+040.00  3.41  6.81  10.00  68.07  1,034,830.63 

390 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5060+060.00  3.42  6.83  10.00  68.26  1,034,762.37 


5060+080.00  3.42  6.84  10.00  68.37  1,034,694.00 
5060+100.00  3.42  6.85  10.00  68.45  1,034,625.55 
5060+120.00  3.43  6.85  10.00  68.50  1,034,557.05 
5060+140.00  3.42  6.85  10.00  68.50  1,034,488.55 
5060+160.00  3.42  6.84  10.00  68.40  1,034,420.15 
5060+180.00  3.43  6.84  10.00  68.43  1,034,351.72 
5060+200.00  3.43  6.86  10.00  68.55  1,034,283.17 
5060+220.00  3.44  6.87  10.00  68.70  1,034,214.47 
5060+240.00  3.48  6.92  10.00  69.22  1,034,145.25 
5060+260.00  3.45  6.93  10.00  69.32  1,034,075.93 
5060+280.00  3.43  6.88  10.00  68.84  1,034,007.09 
5060+300.00  3.43  6.86  10.00  68.60  1,033,938.49 
5060+320.00  3.43  6.86  10.00  68.59  1,033,869.90 
5060+340.00  3.43  6.86  10.00  68.63  1,033,801.27 
5060+360.00  3.43  6.86  10.00  68.59  1,033,732.68 
5060+380.00  3.43  6.86  10.00  68.56  1,033,664.12 
5060+400.00  3.43  6.86  10.00  68.61  1,033,595.51 
5060+420.00  3.43  6.86  10.00  68.59  1,033,526.92 
5060+440.00  3.42  6.85  10.00  68.51  1,033,458.41 
5060+460.00  3.42  6.85  10.00  68.47  1,033,389.94 
5060+480.00  3.42  6.85  10.00  68.46  1,033,321.48 
5060+500.00  3.42  6.85  10.00  68.47  1,033,253.01 
5060+520.00  3.42  6.85  10.00  68.45  1,033,184.56 
5060+540.00  3.42  6.84  10.00  68.42  1,033,116.14 
5060+560.00  3.42  6.84  10.00  68.42  1,033,047.72 
5060+580.00  3.42  6.84  10.00  68.42  1,032,979.30 
5060+600.00  3.42  6.84  10.00  68.42  1,032,910.88 
5060+620.00  3.42  6.84  10.00  68.42  1,032,842.46 
5060+640.00  3.42  6.84  10.00  68.42  1,032,774.04 
5060+660.00  3.42  6.84  10.00  68.42  1,032,705.62 
5060+680.00  3.42  6.84  10.00  68.42  1,032,637.20 
5060+700.00  3.43  6.85  10.00  68.46  1,032,568.74 
5060+720.00  3.43  6.85  10.00  68.51  1,032,500.23 
5060+740.00  3.43  6.85  10.00  68.52  1,032,431.71 
5060+760.00  3.43  6.85  10.00  68.53  1,032,363.18 
5060+780.00  3.43  6.86  10.00  68.58  1,032,294.60 
5060+800.00  3.42  6.85  10.00  68.53  1,032,226.07 
5060+820.00  3.42  6.84  10.00  68.44  1,032,157.63 
5060+840.00  3.43  6.85  10.00  68.49  1,032,089.14 
5060+860.00  3.43  6.85  10.00  68.53  1,032,020.61 
5060+880.00  3.42  6.85  10.00  68.48  1,031,952.13 
5060+900.00  3.42  6.84  10.00  68.44  1,031,883.69 
5060+920.00  3.42  6.84  10.00  68.44  1,031,815.25 
5060+940.00  3.42  6.84  10.00  68.43  1,031,746.82 

391 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5060+960.00  3.42  6.84  10.00  68.43  1,031,678.39 


5060+980.00  3.42  6.84  10.00  68.44  1,031,609.95 
5061+000.00  3.43  6.85  10.00  68.49  1,031,541.46 
5061+020.00  3.43  6.85  10.00  68.54  1,031,472.92 
5061+040.00  3.45  6.88  10.00  68.79  1,031,404.13 
5061+060.00  3.43  6.88  10.00  68.77  1,031,335.36 
5061+080.00  3.42  6.85  10.00  68.47  1,031,266.89 
5061+100.00  3.42  6.84  10.00  68.44  1,031,198.45 
5061+120.00  3.42  6.84  10.00  68.43  1,031,130.02 
5061+140.00  3.42  6.84  10.00  68.42  1,031,061.60 
5061+160.00  3.42  6.84  10.00  68.42  1,030,993.18 
5061+180.00  3.42  6.84  10.00  68.42  1,030,924.76 
5061+200.00  3.42  6.84  10.00  68.42  1,030,856.34 
5061+220.00  3.42  6.84  10.00  68.42  1,030,787.92 
5061+240.00  3.42  6.84  10.00  68.42  1,030,719.50 
5061+260.00  3.42  6.84  10.00  68.42  1,030,651.08 
5061+280.00  3.42  6.84  10.00  68.42  1,030,582.66 
5061+300.00  3.42  6.84  10.00  68.42  1,030,514.24 
5061+320.00  3.42  6.84  10.00  68.42  1,030,445.82 
5061+340.00  3.42  6.84  10.00  68.42  1,030,377.40 
5061+360.00  3.42  6.84  10.00  68.42  1,030,308.98 
5061+380.00  3.42  6.84  10.00  68.42  1,030,240.56 
5061+400.00  3.42  6.84  10.00  68.42  1,030,172.14 
5061+420.00  3.42  6.84  10.00  68.42  1,030,103.72 
5061+440.00  3.42  6.84  10.00  68.42  1,030,035.30 
5061+460.00  3.42  6.84  10.00  68.42  1,029,966.88 
5061+480.00  3.42  6.84  10.00  68.39  1,029,898.49 
5061+500.00  3.42  6.84  10.00  68.36  1,029,830.13 
5061+520.00  3.42  6.84  10.00  68.36  1,029,761.77 
5061+540.00  3.42  6.84  10.00  68.35  1,029,693.42 
5061+560.00  3.40  6.82  10.00  68.16  1,029,625.26 
5061+580.00  3.42  6.82  10.00  68.20  1,029,557.06 
5061+600.00  3.42  6.84  10.00  68.42  1,029,488.64 
5061+620.00  3.42  6.84  10.00  68.42  1,029,420.22 
5061+640.00  3.42  6.84  10.00  68.39  1,029,351.83 
5061+660.00  3.43  6.84  10.00  68.43  1,029,283.40 
5061+680.00  3.46  6.88  10.00  68.82  1,029,214.58 
5061+700.00  3.48  6.93  10.00  69.34  1,029,145.24 
5061+720.00  3.48  6.95  10.00  69.53  1,029,075.71 
5061+740.00  3.48  6.95  10.00  69.52  1,029,006.19 
5061+760.00  3.47  6.95  10.00  69.45  1,028,936.74 
5061+780.00  3.45  6.92  10.00  69.17  1,028,867.57 
5061+800.00  3.44  6.89  10.00  68.88  1,028,798.69 
5061+820.00  3.43  6.87  10.00  68.69  1,028,730.00 
5061+840.00  3.42  6.85  10.00  68.50  1,028,661.50 

392 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5061+860.00  3.42  6.84  10.00  68.38  1,028,593.12 


5061+880.00  3.40  6.82  10.00  68.19  1,028,524.93 
5061+900.00  3.40  6.80  10.00  67.98  1,028,456.95 
5061+920.00  3.40  6.79  10.00  67.92  1,028,389.03 
5061+940.00  3.40  6.79  10.00  67.92  1,028,321.11 
5061+960.00  3.40  6.79  10.00  67.92  1,028,253.19 
5061+980.00  3.40  6.79  10.00  67.92  1,028,185.27 
5062+000.00  3.39  6.78  10.00  67.82  1,028,117.45 
5062+020.00  3.39  6.77  10.00  67.72  1,028,049.73 
5062+040.00  3.40  6.78  10.00  67.82  1,027,981.91 
5062+060.00  3.40  6.79  10.00  67.92  1,027,913.99 
5062+080.00  3.40  6.79  10.00  67.92  1,027,846.07 
5062+100.00  3.40  6.79  10.00  67.92  1,027,778.15 
5062+120.00  3.40  6.79  10.00  67.92  1,027,710.23 
5062+140.00  3.40  6.79  10.00  67.92  1,027,642.31 
5062+160.00  3.40  6.79  10.00  67.92  1,027,574.39 
5062+180.00  3.41  6.80  10.00  68.02  1,027,506.37 
5062+200.00  3.42  6.83  10.00  68.29  1,027,438.08 
5062+220.00  3.43  6.86  10.00  68.55  1,027,369.53 
5062+240.00  3.46  6.89  10.00  68.90  1,027,300.63 
5062+260.00  3.49  6.95  10.00  69.45  1,027,231.18 
5062+280.00  3.50  6.98  10.00  69.83  1,027,161.35 
5062+300.00  3.52  7.01  10.00  70.14  1,027,091.21 
5062+320.00  3.54  7.06  10.00  70.58  1,027,020.63 
5062+340.00  3.54  7.08  10.00  70.83  1,026,949.80 
5062+360.00  3.55  7.09  10.00  70.89  1,026,878.91 
5062+380.00  3.55  7.09  10.00  70.92  1,026,807.99 
5062+400.00  3.57  7.12  10.00  71.16  1,026,736.83 
5062+420.00  3.51  7.08  10.00  70.77  1,026,666.06 
5062+440.00  3.49  6.99  10.00  69.94  1,026,596.12 
5062+460.00  3.49  6.97  10.00  69.74  1,026,526.38 
5062+480.00  3.48  6.97  10.00  69.68  1,026,456.70 
5062+500.00  3.46  6.95  10.00  69.45  1,026,387.25 
5062+520.00  3.45  6.92  10.00  69.15  1,026,318.10 
5062+540.00  3.44  6.89  10.00  68.94  1,026,249.16 
5062+560.00  3.43  6.88  10.00  68.77  1,026,180.39 
5062+580.00  3.42  6.86  10.00  68.56  1,026,111.83 
5062+600.00  3.40  6.82  10.00  68.19  1,026,043.64 
5062+620.00  3.40  6.79  10.00  67.94  1,025,975.70 
5062+640.00  3.40  6.79  10.00  67.94  1,025,907.76 
5062+660.00  3.40  6.79  10.00  67.94  1,025,839.82 
5062+680.00  3.40  6.79  10.00  67.93  1,025,771.89 
5062+700.00  3.40  6.79  10.00  67.92  1,025,703.97 
5062+720.00  3.40  6.79  10.00  67.92  1,025,636.05 
5062+740.00  3.40  6.79  10.00  67.92  1,025,568.13 

393 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5062+760.00  3.40  6.79  10.00  67.92  1,025,500.21 


5062+780.00  3.40  6.79  10.00  67.93  1,025,432.28 
5062+800.00  3.40  6.79  10.00  67.94  1,025,364.34 
5062+820.00  3.40  6.80  10.00  67.97  1,025,296.37 
5062+840.00  3.44  6.84  10.00  68.40  1,025,227.97 
5062+860.00  3.47  6.91  10.00  69.14  1,025,158.83 
5062+880.00  3.49  6.96  10.00  69.64  1,025,089.19 
5062+900.00  3.49  6.98  10.00  69.78  1,025,019.41 
5062+920.00  3.49  6.97  10.00  69.74  1,024,949.67 
5062+940.00  3.48  6.97  10.00  69.70  1,024,879.97 
5062+960.00  3.48  6.97  10.00  69.68  1,024,810.29 
5062+980.00  3.48  6.97  10.00  69.68  1,024,740.61 
5063+000.00  3.48  6.97  10.00  69.68  1,024,670.93 
5063+020.00  3.48  6.97  10.00  69.68  1,024,601.25 
5063+040.00  3.49  6.97  10.00  69.69  1,024,531.56 
5063+060.00  3.49  6.97  10.00  69.70  1,024,461.86 
5063+080.00  3.49  6.97  10.00  69.71  1,024,392.15 
5063+100.00  3.45  6.93  10.00  69.31  1,024,322.84 
5063+120.00  3.43  6.87  10.00  68.73  1,024,254.11 
5063+140.00  3.43  6.86  10.00  68.56  1,024,185.55 
5063+160.00  3.43  6.86  10.00  68.57  1,024,116.98 
5063+180.00  3.43  6.86  10.00  68.59  1,024,048.39 
5063+200.00  3.43  6.86  10.00  68.60  1,023,979.79 
5063+220.00  3.43  6.86  10.00  68.61  1,023,911.18 
5063+240.00  3.43  6.86  10.00  68.63  1,023,842.55 
5063+260.00  3.43  6.86  10.00  68.64  1,023,773.91 
5063+280.00  3.43  6.87  10.00  68.65  1,023,705.26 
5063+300.00  3.43  6.87  10.00  68.66  1,023,636.60 
5063+320.00  3.43  6.87  10.00  68.67  1,023,567.93 
5063+340.00  3.47  6.90  10.00  69.04  1,023,498.89 
5063+360.00  3.48  6.95  10.00  69.52  1,023,429.37 
5063+380.00  3.48  6.96  10.00  69.57  1,023,359.80 
5063+400.00  3.49  6.97  10.00  69.67  1,023,290.13 
5063+420.00  3.46  6.95  10.00  69.51  1,023,220.62 
5063+440.00  3.44  6.90  10.00  68.97  1,023,151.65 
5063+460.00  3.41  6.85  10.00  68.49  1,023,083.16 
5063+480.00  3.40  6.81  10.00  68.08  1,023,015.08 
5063+500.00  3.40  6.79  10.00  67.93  1,022,947.15 
5063+520.00  3.40  6.79  10.00  67.93  1,022,879.22 
5063+540.00  3.40  6.79  10.00  67.94  1,022,811.28 
5063+560.00  3.40  6.79  10.00  67.94  1,022,743.34 
5063+580.00  3.40  6.79  10.00  67.94  1,022,675.40 
5063+600.00  3.40  6.79  10.00  67.94  1,022,607.46 
5063+620.00  3.40  6.79  10.00  67.94  1,022,539.52 
5063+640.00  3.40  6.79  10.00  67.94  1,022,471.58 

394 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5063+660.00  3.40  6.79  10.00  67.93  1,022,403.65 


5063+680.00  3.40  6.79  10.00  67.92  1,022,335.73 
5063+700.00  3.40  6.79  10.00  67.92  1,022,267.81 
5063+720.00  3.40  6.79  10.00  67.92  1,022,199.89 
5063+740.00  3.40  6.79  10.00  67.92  1,022,131.97 
5063+760.00  3.40  6.79  10.00  67.92  1,022,064.05 
5063+780.00  3.40  6.79  10.00  67.92  1,021,996.13 
5063+800.00  3.40  6.79  10.00  67.92  1,021,928.21 
5063+820.00  3.40  6.79  10.00  67.92  1,021,860.29 
5063+840.00  3.40  6.79  10.00  67.91  1,021,792.38 
5063+860.00  3.40  6.79  10.00  67.90  1,021,724.48 
5063+880.00  3.40  6.79  10.00  67.91  1,021,656.57 
5063+900.00  3.40  6.79  10.00  67.92  1,021,588.65 
5063+920.00  3.40  6.79  10.00  67.92  1,021,520.73 
5063+940.00  3.40  6.79  10.00  67.92  1,021,452.81 
5063+960.00  3.40  6.79  10.00  67.92  1,021,384.89 
5063+980.00  3.40  6.79  10.00  67.92  1,021,316.97 
5064+000.00  3.40  6.79  10.00  67.92  1,021,249.05 
5064+020.00  3.41  6.80  10.00  68.04  1,021,181.01 
5064+040.00  3.40  6.80  10.00  68.04  1,021,112.97 
5064+060.00  3.40  6.79  10.00  67.92  1,021,045.05 
5064+080.00  3.40  6.79  10.00  67.92  1,020,977.13 
5064+100.00  3.40  6.79  10.00  67.92  1,020,909.21 
5064+120.00  3.40  6.79  10.00  67.92  1,020,841.29 
5064+140.00  3.40  6.79  10.00  67.92  1,020,773.37 
5064+160.00  3.40  6.79  10.00  67.92  1,020,705.45 
5064+180.00  3.40  6.79  10.00  67.92  1,020,637.53 
5064+200.00  3.40  6.79  10.00  67.92  1,020,569.61 
5064+220.00  3.40  6.79  10.00  67.92  1,020,501.69 
5064+240.00  3.40  6.79  10.00  67.92  1,020,433.77 
5064+260.00  3.40  6.79  10.00  67.92  1,020,365.85 
5064+280.00  3.40  6.79  10.00  67.92  1,020,297.93 
5064+300.00  3.40  6.79  10.00  67.92  1,020,230.01 
5064+320.00  3.40  6.79  10.00  67.91  1,020,162.10 
5064+340.00  3.40  6.79  10.00  67.90  1,020,094.20 
5064+360.00  3.40  6.79  10.00  67.91  1,020,026.29 
5064+380.00  3.40  6.79  10.00  67.91  1,019,958.38 
5064+400.00  3.40  6.79  10.00  67.90  1,019,890.48 
5064+420.00  3.40  6.79  10.00  67.90  1,019,822.58 
5064+440.00  3.39  6.79  10.00  67.89  1,019,754.69 
5064+460.00  3.39  6.79  10.00  67.88  1,019,686.81 
5064+480.00  3.39  6.79  10.00  67.88  1,019,618.93 
5064+500.00  3.39  6.79  10.00  67.88  1,019,551.05 
5064+520.00  3.39  6.79  10.00  67.88  1,019,483.17 
5064+540.00  3.39  6.79  10.00  67.88  1,019,415.29 

395 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5064+560.00  3.39  6.79  10.00  67.87  1,019,347.42 


5064+580.00  3.39  6.79  10.00  67.87  1,019,279.55 
5064+600.00  3.39  6.79  10.00  67.87  1,019,211.68 
5064+620.00  3.39  6.79  10.00  67.86  1,019,143.82 
5064+640.00  3.39  6.79  10.00  67.86  1,019,075.96 
5064+660.00  3.39  6.79  10.00  67.86  1,019,008.10 
5064+680.00  3.39  6.79  10.00  67.86  1,018,940.24 
5064+700.00  3.39  6.79  10.00  67.86  1,018,872.38 
5064+720.00  3.39  6.79  10.00  67.86  1,018,804.52 
5064+740.00  3.39  6.79  10.00  67.86  1,018,736.66 
5064+760.00  3.39  6.79  10.00  67.85  1,018,668.81 
5064+780.00  3.39  6.78  10.00  67.84  1,018,600.97 
5064+800.00  3.39  6.78  10.00  67.84  1,018,533.13 
5064+820.00  3.39  6.78  10.00  67.84  1,018,465.29 
5064+840.00  3.39  6.78  10.00  67.84  1,018,397.45 
5064+860.00  3.39  6.78  10.00  67.84  1,018,329.61 
5064+880.00  3.39  6.79  10.00  67.85  1,018,261.76 
5064+900.00  3.39  6.79  10.00  67.86  1,018,193.90 
5064+920.00  3.39  6.79  10.00  67.85  1,018,126.05 
5064+940.00  3.39  6.78  10.00  67.84  1,018,058.21 
5064+960.00  3.39  6.78  10.00  67.84  1,017,990.37 
5064+980.00  3.39  6.78  10.00  67.84  1,017,922.53 
5065+000.00  0.00  3.39  10.00  33.92  1,017,888.61 
5065+020.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+040.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+060.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+080.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+100.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+120.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+140.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+160.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+180.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+200.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+220.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+240.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+260.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+280.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+300.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+320.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+340.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+360.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+380.00  0.00  0.00  10.00  0.00  1,017,888.61 
5065+400.00  4.32  4.32  10.00  43.21  1,017,845.40 
5065+420.00  4.32  8.64  10.00  86.42  1,017,758.98 
5065+440.00  4.32  8.64  10.00  86.42  1,017,672.56 

396 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5065+460.00  4.32  8.64  10.00  86.42  1,017,586.14 


5065+480.00  4.32  8.64  10.00  86.42  1,017,499.72 
5065+500.00  4.32  8.64  10.00  86.42  1,017,413.30 
5065+520.00  4.32  8.64  10.00  86.42  1,017,326.88 
5065+540.00  4.32  8.64  10.00  86.42  1,017,240.46 
5065+560.00  0.00  4.32  10.00  43.21  1,017,197.25 
5065+580.00  4.32  4.32  10.00  43.21  1,017,154.04 
5065+600.00  4.32  8.64  10.00  86.42  1,017,067.62 
5065+620.00  4.32  8.64  10.00  86.42  1,016,981.20 
5065+640.00  4.32  8.64  10.00  86.42  1,016,894.78 
5065+660.00  4.32  8.64  10.00  86.42  1,016,808.36 
5065+680.00  4.32  8.64  10.00  86.42  1,016,721.94 
5065+700.00  4.32  8.64  10.00  86.42  1,016,635.52 
5065+720.00  4.32  8.64  10.00  86.42  1,016,549.10 
5065+740.00  4.32  8.64  10.00  86.42  1,016,462.68 
5065+760.00  4.32  8.64  10.00  86.42  1,016,376.26 
5065+780.00  4.32  8.64  10.00  86.42  1,016,289.84 
5065+800.00  4.32  8.64  10.00  86.42  1,016,203.42 
5065+820.00  4.32  8.64  10.00  86.42  1,016,117.00 
5065+840.00  0.00  4.32  10.00  43.21  1,016,073.79 
5065+860.00  4.32  4.32  10.00  43.21  1,016,030.58 
5065+880.00  4.32  8.64  10.00  86.42  1,015,944.16 
5065+900.00  4.32  8.64  10.00  86.42  1,015,857.74 
5065+920.00  4.32  8.64  10.00  86.42  1,015,771.32 
5065+940.00  4.32  8.64  10.00  86.42  1,015,684.90 
5065+960.00  4.32  8.64  10.00  86.42  1,015,598.48 
5065+980.00  4.32  8.64  10.00  86.42  1,015,512.06 
5066+000.00  4.32  8.64  10.00  86.42  1,015,425.64 
5066+020.00  4.32  8.64  10.00  86.42  1,015,339.22 
5066+040.00  4.32  8.64  10.00  86.42  1,015,252.80 
5066+060.00  4.32  8.64  10.00  86.42  1,015,166.38 
5066+080.00  4.32  8.64  10.00  86.42  1,015,079.96 
5066+100.00  4.32  8.64  10.00  86.42  1,014,993.54 
5066+120.00  4.32  8.64  10.00  86.42  1,014,907.12 
5066+140.00  4.32  8.64  10.00  86.42  1,014,820.70 
5066+160.00  4.32  8.64  10.00  86.42  1,014,734.28 
5066+180.00  4.32  8.64  10.00  86.42  1,014,647.86 
5066+200.00  4.32  8.64  10.00  86.42  1,014,561.44 
5066+220.00  4.32  8.64  10.00  86.42  1,014,475.02 
5066+240.00  4.32  8.64  10.00  86.42  1,014,388.60 
5066+260.00  4.32  8.64  10.00  86.42  1,014,302.18 
5066+280.00  4.32  8.64  10.00  86.42  1,014,215.76 
5066+300.00  4.32  8.64  10.00  86.42  1,014,129.34 
5066+320.00  4.32  8.64  10.00  86.42  1,014,042.92 
5066+340.00  4.32  8.64  10.00  86.42  1,013,956.50 

397 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5066+360.00  4.32  8.64  10.00  86.42  1,013,870.08 


5066+380.00  4.32  8.64  10.00  86.42  1,013,783.66 
5066+400.00  4.32  8.64  10.00  86.42  1,013,697.24 
5066+420.00  4.32  8.64  10.00  86.42  1,013,610.82 
5066+440.00  4.32  8.64  10.00  86.42  1,013,524.40 
5066+460.00  4.32  8.64  10.00  86.42  1,013,437.98 
5066+480.00  4.32  8.64  10.00  86.42  1,013,351.56 
5066+500.00  4.32  8.64  10.00  86.42  1,013,265.14 
5066+520.00  4.32  8.64  10.00  86.42  1,013,178.72 
5066+540.00  4.32  8.64  10.00  86.42  1,013,092.30 
5066+560.00  4.32  8.64  10.00  86.42  1,013,005.88 
5066+580.00  4.32  8.64  10.00  86.42  1,012,919.46 
5066+600.00  4.32  8.64  10.00  86.42  1,012,833.04 
5066+620.00  4.32  8.64  10.00  86.42  1,012,746.62 
5066+640.00  4.32  8.64  10.00  86.42  1,012,660.20 
5066+660.00  4.32  8.64  10.00  86.42  1,012,573.78 
5066+680.00  4.32  8.64  10.00  86.42  1,012,487.36 
5066+700.00  4.32  8.64  10.00  86.42  1,012,400.94 
5066+720.00  4.32  8.64  10.00  86.42  1,012,314.52 
5066+740.00  4.32  8.64  10.00  86.42  1,012,228.10 
5066+760.00  4.32  8.64  10.00  86.42  1,012,141.68 
5066+780.00  4.32  8.64  10.00  86.42  1,012,055.26 
5066+800.00  4.32  8.64  10.00  86.42  1,011,968.84 
5066+820.00  4.32  8.64  10.00  86.42  1,011,882.42 
5066+840.00  4.32  8.64  10.00  86.42  1,011,796.00 
5066+860.00  4.32  8.64  10.00  86.42  1,011,709.58 
5066+880.00  4.32  8.64  10.00  86.42  1,011,623.16 
5066+900.00  4.32  8.64  10.00  86.42  1,011,536.74 
5066+920.00  4.32  8.64  10.00  86.42  1,011,450.32 
5066+940.00  4.32  8.64  10.00  86.42  1,011,363.90 
5066+960.00  4.32  8.64  10.00  86.42  1,011,277.48 
5066+980.00  4.32  8.64  10.00  86.42  1,011,191.06 
5067+000.00  4.32  8.64  10.00  86.42  1,011,104.64 
5067+020.00  4.32  8.64  10.00  86.42  1,011,018.22 
5067+040.00  4.32  8.64  10.00  86.42  1,010,931.80 
5067+060.00  4.32  8.64  10.00  86.42  1,010,845.38 
5067+080.00  4.32  8.64  10.00  86.42  1,010,758.96 
5067+100.00  4.32  8.64  10.00  86.42  1,010,672.54 
5067+120.00  4.32  8.64  10.00  86.42  1,010,586.12 
5067+140.00  4.32  8.64  10.00  86.42  1,010,499.70 
5067+160.00  4.32  8.64  10.00  86.42  1,010,413.28 
5067+180.00  4.32  8.64  10.00  86.42  1,010,326.86 
5067+200.00  4.32  8.64  10.00  86.42  1,010,240.44 
5067+220.00  4.32  8.64  10.00  86.42  1,010,154.02 
5067+240.00  4.32  8.64  10.00  86.42  1,010,067.60 

398 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5067+260.00  4.32  8.64  10.00  86.42  1,009,981.18 


5067+280.00  4.32  8.64  10.00  86.42  1,009,894.76 
5067+300.00  4.32  8.64  10.00  86.42  1,009,808.34 
5067+320.00  4.32  8.64  10.00  86.42  1,009,721.92 
5067+340.00  4.32  8.64  10.00  86.42  1,009,635.50 
5067+360.00  4.32  8.64  10.00  86.42  1,009,549.08 
5067+380.00  4.32  8.64  10.00  86.42  1,009,462.66 
5067+400.00  4.32  8.64  10.00  86.42  1,009,376.24 
5067+420.00  4.32  8.64  10.00  86.42  1,009,289.82 
5067+440.00  4.32  8.64  10.00  86.42  1,009,203.40 
5067+460.00  4.32  8.64  10.00  86.42  1,009,116.98 
5067+480.00  4.32  8.64  10.00  86.42  1,009,030.56 
5067+500.00  4.32  8.64  10.00  86.42  1,008,944.14 
5067+520.00  4.32  8.64  10.00  86.42  1,008,857.72 
5067+540.00  4.32  8.64  10.00  86.42  1,008,771.30 
5067+560.00  4.32  8.64  10.00  86.42  1,008,684.88 
5067+580.00  4.32  8.64  10.00  86.42  1,008,598.46 
5067+600.00  4.32  8.64  10.00  86.42  1,008,512.04 
5067+620.00  4.32  8.64  10.00  86.42  1,008,425.62 
5067+640.00  4.32  8.64  10.00  86.42  1,008,339.20 
5067+660.00  4.32  8.64  10.00  86.42  1,008,252.78 
5067+680.00  4.32  8.64  10.00  86.42  1,008,166.36 
5067+700.00  4.32  8.64  10.00  86.42  1,008,079.94 
5067+720.00  4.32  8.64  10.00  86.42  1,007,993.52 
5067+740.00  4.32  8.64  10.00  86.42  1,007,907.10 
5067+760.00  4.32  8.64  10.00  86.42  1,007,820.68 
5067+780.00  4.32  8.64  10.00  86.42  1,007,734.26 
5067+800.00  4.32  8.64  10.00  86.42  1,007,647.84 
5067+820.00  4.32  8.64  10.00  86.42  1,007,561.42 
5067+840.00  4.32  8.64  10.00  86.42  1,007,475.00 
5067+860.00  4.32  8.64  10.00  86.42  1,007,388.58 
5067+880.00  4.32  8.64  10.00  86.42  1,007,302.16 
5067+900.00  4.32  8.64  10.00  86.42  1,007,215.74 
5067+920.00  4.32  8.64  10.00  86.42  1,007,129.32 
5067+940.00  4.32  8.64  10.00  86.42  1,007,042.90 
5067+960.00  4.32  8.64  10.00  86.42  1,006,956.48 
5067+980.00  4.32  8.64  10.00  86.42  1,006,870.06 
5068+000.00  4.32  8.64  10.00  86.42  1,006,783.64 
5068+020.00  4.32  8.64  10.00  86.42  1,006,697.22 
5068+040.00  4.32  8.64  10.00  86.42  1,006,610.80 
5068+060.00  4.32  8.64  10.00  86.42  1,006,524.38 
5068+080.00  4.32  8.64  10.00  86.42  1,006,437.96 
5068+100.00  4.32  8.64  10.00  86.42  1,006,351.54 
5068+120.00  4.32  8.64  10.00  86.42  1,006,265.12 
5068+140.00  4.32  8.64  10.00  86.42  1,006,178.70 

399 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5068+160.00  4.32  8.64  10.00  86.42  1,006,092.28 


5068+180.00  4.32  8.64  10.00  86.42  1,006,005.86 
5068+200.00  4.32  8.64  10.00  86.42  1,005,919.44 
5068+220.00  4.32  8.64  10.00  86.42  1,005,833.02 
5068+240.00  4.32  8.64  10.00  86.42  1,005,746.60 
5068+260.00  4.32  8.64  10.00  86.42  1,005,660.18 
5068+280.00  4.32  8.64  10.00  86.42  1,005,573.76 
5068+300.00  4.32  8.64  10.00  86.42  1,005,487.34 
5068+320.00  4.32  8.64  10.00  86.42  1,005,400.92 
5068+340.00  4.32  8.64  10.00  86.42  1,005,314.50 
5068+360.00  4.32  8.64  10.00  86.42  1,005,228.08 
5068+380.00  4.32  8.64  10.00  86.42  1,005,141.66 
5068+400.00  4.32  8.64  10.00  86.42  1,005,055.24 
5068+420.00  4.32  8.64  10.00  86.42  1,004,968.82 
5068+440.00  4.32  8.64  10.00  86.42  1,004,882.40 
5068+460.00  4.32  8.64  10.00  86.42  1,004,795.98 
5068+480.00  4.32  8.64  10.00  86.42  1,004,709.56 
5068+500.00  4.32  8.64  10.00  86.42  1,004,623.14 
5068+520.00  4.32  8.64  10.00  86.42  1,004,536.72 
5068+540.00  4.32  8.64  10.00  86.42  1,004,450.30 
5068+560.00  4.32  8.64  10.00  86.42  1,004,363.88 
5068+580.00  4.32  8.64  10.00  86.42  1,004,277.46 
5068+600.00  4.32  8.64  10.00  86.42  1,004,191.04 
5068+620.00  4.32  8.64  10.00  86.42  1,004,104.62 
5068+640.00  4.32  8.64  10.00  86.42  1,004,018.20 
5068+660.00  4.32  8.64  10.00  86.42  1,003,931.78 
5068+680.00  4.32  8.64  10.00  86.42  1,003,845.36 
5068+700.00  4.32  8.64  10.00  86.42  1,003,758.94 
5068+720.00  4.32  8.64  10.00  86.42  1,003,672.52 
5068+740.00  4.32  8.64  10.00  86.42  1,003,586.10 
5068+760.00  4.32  8.64  10.00  86.42  1,003,499.68 
5068+780.00  4.32  8.64  10.00  86.42  1,003,413.26 
5068+800.00  4.32  8.64  10.00  86.42  1,003,326.84 
5068+820.00  4.32  8.64  10.00  86.42  1,003,240.42 
5068+840.00  4.32  8.64  10.00  86.42  1,003,154.00 
5068+860.00  4.32  8.64  10.00  86.42  1,003,067.58 
5068+880.00  4.32  8.64  10.00  86.42  1,002,981.16 
5068+900.00  4.32  8.64  10.00  86.42  1,002,894.74 
5068+920.00  4.32  8.64  10.00  86.42  1,002,808.32 
5068+940.00  4.32  8.64  10.00  86.42  1,002,721.90 
5068+960.00  4.32  8.64  10.00  86.42  1,002,635.48 
5068+980.00  4.32  8.64  10.00  86.42  1,002,549.06 
5069+000.00  4.32  8.64  10.00  86.42  1,002,462.64 
5069+020.00  4.32  8.64  10.00  86.43  1,002,376.21 
5069+040.00  4.32  8.64  10.00  86.44  1,002,289.77 

400 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5069+060.00  4.32  8.64  10.00  86.44  1,002,203.33 


5069+080.00  4.32  8.64  10.00  86.44  1,002,116.89 
5069+100.00  4.32  8.64  10.00  86.44  1,002,030.45 
5069+120.00  4.32  8.64  10.00  86.44  1,001,944.01 
5069+140.00  4.32  8.64  10.00  86.44  1,001,857.57 
5069+160.00  4.32  8.64  10.00  86.44  1,001,771.13 
5069+180.00  4.32  8.64  10.00  86.44  1,001,684.69 
5069+200.00  4.32  8.64  10.00  86.44  1,001,598.25 
5069+220.00  4.32  8.64  10.00  86.44  1,001,511.81 
5069+240.00  4.32  8.64  10.00  86.44  1,001,425.37 
5069+260.00  4.32  8.64  10.00  86.44  1,001,338.93 
5069+280.00  4.32  8.64  10.00  86.44  1,001,252.49 
5069+300.00  4.32  8.64  10.00  86.44  1,001,166.05 
5069+320.00  4.32  8.64  10.00  86.44  1,001,079.61 
5069+340.00  4.32  8.64  10.00  86.44  1,000,993.17 
5069+360.00  4.32  8.64  10.00  86.44  1,000,906.73 
5069+380.00  4.32  8.64  10.00  86.44  1,000,820.29 
5069+400.00  4.32  8.64  10.00  86.44  1,000,733.85 
5069+420.00  4.32  8.64  10.00  86.44  1,000,647.41 
5069+440.00  4.32  8.64  10.00  86.44  1,000,560.97 
5069+460.00  4.32  8.64  10.00  86.44  1,000,474.53 
5069+480.00  4.32  8.64  10.00  86.44  1,000,388.09 
5069+500.00  4.32  8.64  10.00  86.44  1,000,301.65 
5069+520.00  4.32  8.64  10.00  86.44  1,000,215.21 
5069+540.00  4.32  8.64  10.00  86.44  1,000,128.77 
5069+560.00  4.32  8.64  10.00  86.44  1,000,042.33 
5069+580.00  4.32  8.64  10.00  86.44  999,955.89 
5069+600.00  4.32  8.64  10.00  86.44  999,869.45 
5069+620.00  4.32  8.64  10.00  86.44  999,783.01 
5069+640.00  4.32  8.64  10.00  86.44  999,696.57 
5069+660.00  4.32  8.64  10.00  86.44  999,610.13 
5069+680.00  4.32  8.64  10.00  86.43  999,523.70 
5069+700.00  4.32  8.64  10.00  86.42  999,437.28 
5069+720.00  4.32  8.64  10.00  86.42  999,350.86 
5069+740.00  4.32  8.64  10.00  86.42  999,264.44 
5069+760.00  4.32  8.64  10.00  86.42  999,178.02 
5069+780.00  4.32  8.64  10.00  86.42  999,091.60 
5069+800.00  4.32  8.64  10.00  86.42  999,005.18 
5069+820.00  4.32  8.64  10.00  86.42  998,918.76 
5069+840.00  4.32  8.64  10.00  86.42  998,832.34 
5069+860.00  4.32  8.64  10.00  86.42  998,745.92 
5069+880.00  4.32  8.64  10.00  86.42  998,659.50 
5069+900.00  4.32  8.64  10.00  86.42  998,573.08 
5069+920.00  4.32  8.64  10.00  86.42  998,486.66 
5069+940.00  4.32  8.64  10.00  86.42  998,400.24 

401 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5051+000 al 5070+000  

5069+960.00  4.32  8.64  10.00  86.42  998,313.82 


5069+980.00  4.32  8.64  10.00  86.42  998,227.40 
5070+000.00  4.32  8.64  10.00  86.42  998,140.98 
 

TABLA 33 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 5070+000 – 6005+000 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

5070+000.00  4.32  4.32        998,145.41 


5070+020.00  4.32  8.64  10.00  86.42  998,058.99 
5070+040.00  4.32  8.64  10.00  86.42  997,972.57 
5070+060.00  4.32  8.64  10.00  86.42  997,886.15 
5070+080.00  4.32  8.64  10.00  86.42  997,799.73 
5070+100.00  4.32  8.64  10.00  86.42  997,713.31 
5070+120.00  4.32  8.64  10.00  86.42  997,626.89 
5070+140.00  4.32  8.64  10.00  86.42  997,540.47 
5070+160.00  4.32  8.64  10.00  86.42  997,454.05 
5070+180.00  4.32  8.64  10.00  86.42  997,367.63 
5070+200.00  4.32  8.64  10.00  86.42  997,281.21 
5070+220.00  4.32  8.64  10.00  86.42  997,194.79 
5070+240.00  4.32  8.64  10.00  86.42  997,108.37 
5070+260.00  4.32  8.64  10.00  86.42  997,021.95 
5070+280.00  4.32  8.64  10.00  86.42  996,935.53 
5070+300.00  4.32  8.64  10.00  86.42  996,849.11 
5070+320.00  4.32  8.64  10.00  86.42  996,762.69 
5070+340.00  4.32  8.64  10.00  86.42  996,676.27 
5070+360.00  4.32  8.64  10.00  86.42  996,589.85 
5070+380.00  4.32  8.64  10.00  86.42  996,503.43 
5070+400.00  4.32  8.64  10.00  86.42  996,417.01 
5070+420.00  4.32  8.64  10.00  86.42  996,330.59 
5070+440.00  4.32  8.64  10.00  86.42  996,244.17 
5070+460.00  4.32  8.64  10.00  86.42  996,157.75 
5070+480.00  4.32  8.64  10.00  86.42  996,071.33 
5070+500.00  4.32  8.64  10.00  86.42  995,984.91 
5070+520.00  4.32  8.64  10.00  86.42  995,898.49 
5070+540.00  4.32  8.64  10.00  86.42  995,812.07 
5070+560.00  6.32  10.64  10.00  106.42  995,705.65 
5070+580.00  6.32  12.64  10.00  126.42  995,579.23 
5070+600.00  6.32  12.64  10.00  126.42  995,452.81 
5070+620.00  6.32  12.64  10.00  126.42  995,326.39 
5070+640.00  6.32  12.64  10.00  126.42  995,199.97 

402 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

5070+660.00  6.32  12.64  10.00  126.42  995,073.55 


5070+680.00  6.32  12.64  10.00  126.42  994,947.13 
5070+700.00  6.32  12.64  10.00  126.42  994,820.71 
5070+720.00  6.32  12.64  10.00  126.42  994,694.29 
5070+740.00  6.32  12.64  10.00  126.42  994,567.87 
5070+760.00  6.32  12.64  10.00  126.42  994,441.45 
5070+780.00  6.32  12.64  10.00  126.42  994,315.03 
5070+800.00  6.32  12.64  10.00  126.42  994,188.61 
5070+820.00  6.32  12.64  10.00  126.42  994,062.19 
5070+840.00  6.32  12.64  10.00  126.42  993,935.77 
5070+860.00  6.32  12.64  10.00  126.42  993,809.35 
5070+880.00  6.32  12.64  10.00  126.42  993,682.93 
5070+900.00  6.32  12.64  10.00  126.42  993,556.51 
5070+920.00  6.32  12.64  10.00  126.42  993,430.09 
5070+940.00  6.32  12.64  10.00  126.42  993,303.67 
5070+960.00  6.32  12.64  10.00  126.42  993,177.25 
5070+980.00  6.32  12.64  10.00  126.42  993,050.83 
5071+000.00  6.32  12.64  10.00  126.42  992,924.41 
5071+020.00  6.32  12.64  10.00  126.42  992,797.99 
5071+040.00  6.32  12.64  10.00  126.42  992,671.57 
5071+060.00  6.32  12.64  10.00  126.42  992,545.15 
5071+080.00  6.32  12.64  10.00  126.42  992,418.73 
5071+100.00  6.32  12.64  10.00  126.42  992,292.31 
5071+120.00  6.32  12.64  10.00  126.42  992,165.89 
5071+140.00  6.32  12.64  10.00  126.42  992,039.47 
5071+160.00  6.32  12.64  10.00  126.42  991,913.05 
5071+180.00  6.32  12.64  10.00  126.42  991,786.63 
5071+200.00  6.32  12.64  10.00  126.42  991,660.21 
5071+220.00  6.32  12.64  10.00  126.42  991,533.79 
5071+240.00  6.32  12.64  10.00  126.42  991,407.37 
5071+260.00  6.32  12.64  10.00  126.42  991,280.95 
5071+280.00  6.32  12.64  10.00  126.42  991,154.53 
5071+300.00  6.32  12.64  10.00  126.42  991,028.11 
5071+320.00  6.32  12.64  10.00  126.42  990,901.69 
5071+340.00  6.32  12.64  10.00  126.42  990,775.27 
5071+360.00  6.32  12.64  10.00  126.42  990,648.85 
5071+380.00  6.32  12.64  10.00  126.42  990,522.43 
5071+400.00  6.32  12.64  10.00  126.42  990,396.01 
5071+420.00  6.32  12.64  10.00  126.42  990,269.59 
5071+440.00  6.32  12.64  10.00  126.42  990,143.17 
5071+460.00  6.32  12.64  10.00  126.42  990,016.75 
5071+480.00  6.32  12.64  10.00  126.42  989,890.33 
5071+500.00  6.32  12.64  10.00  126.42  989,763.91 
5071+520.00  6.32  12.64  10.00  126.42  989,637.49 
5071+540.00  6.32  12.64  10.00  126.42  989,511.07 

403 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

5071+560.00  6.32  12.64  10.00  126.42  989,384.65 


5071+580.00  6.32  12.64  10.00  126.42  989,258.23 
5071+600.00  6.32  12.64  10.00  126.42  989,131.81 
5071+620.00  6.32  12.64  10.00  126.42  989,005.39 
5071+640.00  6.32  12.64  10.00  126.42  988,878.97 
5071+660.00  6.32  12.64  10.00  126.42  988,752.55 
5071+680.00  6.32  12.64  10.00  126.42  988,626.13 
5071+700.00  6.32  12.64  10.00  126.42  988,499.71 
5071+720.00  6.32  12.64  10.00  126.42  988,373.29 
5071+740.00  6.32  12.64  10.00  126.42  988,246.87 
5071+760.00  6.32  12.64  10.00  126.42  988,120.45 
5071+780.00  6.32  12.64  10.00  126.42  987,994.03 
5071+800.00  6.32  12.64  10.00  126.42  987,867.61 
5071+820.00  6.32  12.64  10.00  126.42  987,741.19 
5071+840.00  6.32  12.64  10.00  126.42  987,614.77 
5071+860.00  6.32  12.64  10.00  126.42  987,488.35 
5071+880.00  6.32  12.64  10.00  126.42  987,361.93 
5071+900.00  6.32  12.64  10.00  126.42  987,235.51 
5071+920.00  6.32  12.64  10.00  126.42  987,109.09 
5071+940.00  6.32  12.64  10.00  126.42  986,982.67 
5071+960.00  6.32  12.64  10.00  126.42  986,856.25 
5071+980.00  6.32  12.64  10.00  126.42  986,729.83 
5072+000.00  6.32  12.64  10.00  126.42  986,603.41 
5072+020.00  6.32  12.64  10.00  126.42  986,476.99 
5072+040.00  6.32  12.64  10.00  126.42  986,350.57 
5072+060.00  6.32  12.64  10.00  126.42  986,224.15 
5072+080.00  6.32  12.64  10.00  126.42  986,097.73 
5072+100.00  6.32  12.64  10.00  126.42  985,971.31 
5072+120.00  6.32  12.64  10.00  126.42  985,844.89 
5072+140.00  6.32  12.64  10.00  126.42  985,718.47 
5072+160.00  6.32  12.64  10.00  126.42  985,592.05 
5072+180.00  6.32  12.64  10.00  126.42  985,465.63 
5072+200.00  6.32  12.64  10.00  126.42  985,339.21 
5072+220.00  6.32  12.64  10.00  126.42  985,212.79 
5072+240.00  6.32  12.64  10.00  126.42  985,086.37 
5072+260.00  6.32  12.64  10.00  126.42  984,959.95 
5072+280.00  6.32  12.64  10.00  126.42  984,833.53 
5072+300.00  6.32  12.64  10.00  126.42  984,707.11 
5072+320.00  6.32  12.64  10.00  126.42  984,580.69 
5072+340.00  6.32  12.64  10.00  126.42  984,454.27 
5072+360.00  6.32  12.64  10.00  126.42  984,327.85 
5072+380.00  4.32  10.64  10.00  106.42  984,221.43 
5072+400.00  4.32  8.64  10.00  86.42  984,135.01 
5072+420.00  4.32  8.64  10.00  86.42  984,048.59 
5072+440.00  4.32  8.64  10.00  86.42  983,962.17 

404 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

5072+460.00  4.32  8.64  10.00  86.42  983,875.75 


5072+480.00  4.32  8.64  10.00  86.42  983,789.33 
5072+500.00  4.32  8.64  10.00  86.42  983,702.91 
5072+520.00  4.32  8.64  10.00  86.42  983,616.49 
5072+540.00  4.32  8.64  10.00  86.42  983,530.07 
5072+560.00  4.32  8.64  10.00  86.42  983,443.65 
5072+580.00  4.32  8.64  10.00  86.42  983,357.23 
5072+600.00  4.32  8.64  10.00  86.42  983,270.81 
5072+620.00  4.32  8.64  10.00  86.42  983,184.39 
5072+640.00  4.32  8.64  10.00  86.42  983,097.97 
5072+660.00  4.32  8.64  10.00  86.42  983,011.55 
5072+680.00  4.32  8.64  10.00  86.42  982,925.13 
5072+700.00  4.32  8.64  10.00  86.42  982,838.71 
5072+720.00  4.32  8.64  10.00  86.42  982,752.29 
5072+740.00  4.32  8.64  10.00  86.42  982,665.87 
5072+760.00  4.32  8.64  10.00  86.42  982,579.45 
5072+780.00  4.32  8.64  10.00  86.42  982,493.03 
5072+794.84  4.32  8.64  7.42  64.13  982,428.90 
6000+000.00  4.32  8.64     0.00  1,000,000.00 
6000+020.00  4.32  8.64  10.00  86.42  999,913.58 
6000+040.00  4.32  8.64  10.00  86.42  999,827.16 
6000+060.00  4.32  8.64  10.00  86.42  999,740.74 
6000+080.00  4.32  8.64  10.00  86.42  999,654.32 
6000+100.00  4.32  8.64  10.00  86.42  999,567.90 
6000+120.00  4.32  8.64  10.00  86.42  999,481.48 
6000+140.00  4.32  8.64  10.00  86.42  999,395.06 
6000+160.00  4.32  8.64  10.00  86.42  999,308.64 
6000+180.00  4.32  8.64  10.00  86.42  999,222.22 
6000+200.00  4.32  8.64  10.00  86.42  999,135.80 
6000+220.00  4.32  8.64  10.00  86.42  999,049.38 
6000+240.00  4.32  8.64  10.00  86.42  998,962.96 
6000+260.00  4.32  8.64  10.00  86.42  998,876.54 
6000+280.00  4.32  8.64  10.00  86.42  998,790.12 
6000+300.00  4.32  8.64  10.00  86.42  998,703.70 
6000+320.00  4.32  8.64  10.00  86.42  998,617.28 
6000+340.00  4.32  8.64  10.00  86.42  998,530.86 
6000+360.00  4.32  8.64  10.00  86.42  998,444.44 
6000+380.00  4.32  8.64  10.00  86.42  998,358.02 
6000+400.00  4.32  8.64  10.00  86.42  998,271.60 
6000+420.00  4.32  8.64  10.00  86.42  998,185.18 
6000+440.00  4.32  8.64  10.00  86.42  998,098.76 
6000+460.00  4.32  8.64  10.00  86.42  998,012.34 
6000+480.00  4.32  8.64  10.00  86.42  997,925.92 
6000+500.00  4.32  8.64  10.00  86.42  997,839.50 
6000+520.00  4.32  8.64  10.00  86.42  997,753.08 

405 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

6000+540.00  4.32  8.64  10.00  86.42  997,666.66 


6000+560.00  4.32  8.64  10.00  86.42  997,580.24 
6000+580.00  4.32  8.64  10.00  86.42  997,493.82 
6000+600.00  4.32  8.64  10.00  86.42  997,407.40 
6000+620.00  4.32  8.64  10.00  86.42  997,320.98 
6000+640.00  4.32  8.64  10.00  86.42  997,234.56 
6000+660.00  4.32  8.64  10.00  86.42  997,148.14 
6000+680.00  4.32  8.64  10.00  86.42  997,061.72 
6000+700.00  4.32  8.64  10.00  86.42  996,975.30 
6000+720.00  4.32  8.64  10.00  86.42  996,888.88 
6000+740.00  4.32  8.64  10.00  86.42  996,802.46 
6000+760.00  4.32  8.64  10.00  86.42  996,716.04 
6000+780.00  4.32  8.64  10.00  86.42  996,629.62 
6000+800.00  4.32  8.64  10.00  86.42  996,543.20 
6000+820.00  4.32  8.64  10.00  86.42  996,456.78 
6000+840.00  4.32  8.64  10.00  86.42  996,370.36 
6000+860.00  4.32  8.64  10.00  86.42  996,283.94 
6000+880.00  4.32  8.64  10.00  86.42  996,197.52 
6000+900.00  4.32  8.64  10.00  86.42  996,111.10 
6000+920.00  4.32  8.64  10.00  86.42  996,024.68 
6000+940.00  4.32  8.64  10.00  86.42  995,938.26 
6000+960.00  4.32  8.64  10.00  86.42  995,851.84 
6000+980.00  4.32  8.64  10.00  86.42  995,765.42 
6001+000.00  4.32  8.64  10.00  86.42  995,679.00 
6001+020.00  4.32  8.64  10.00  86.42  995,592.58 
6001+040.00  4.32  8.64  10.00  86.42  995,506.16 
6001+060.00  4.32  8.64  10.00  86.42  995,419.74 
6001+080.00  4.32  8.64  10.00  86.42  995,333.32 
6001+100.00  4.32  8.64  10.00  86.42  995,246.90 
6001+120.00  4.32  8.64  10.00  86.42  995,160.48 
6001+140.00  4.32  8.64  10.00  86.42  995,074.06 
6001+160.00  4.32  8.64  10.00  86.42  994,987.64 
6001+180.00  4.32  8.64  10.00  86.42  994,901.22 
6001+200.00  4.32  8.64  10.00  86.42  994,814.80 
6001+220.00  4.32  8.64  10.00  86.42  994,728.38 
6001+240.00  4.32  8.64  10.00  86.42  994,641.96 
6001+260.00  4.32  8.64  10.00  86.42  994,555.54 
6001+280.00  4.32  8.64  10.00  86.42  994,469.12 
6001+300.00  4.32  8.64  10.00  86.42  994,382.70 
6001+320.00  4.32  8.64  10.00  86.42  994,296.28 
6001+340.00  4.32  8.64  10.00  86.42  994,209.86 
6001+360.00  4.32  8.64  10.00  86.42  994,123.44 
6001+380.00  4.32  8.64  10.00  86.42  994,037.02 
6001+400.00  4.32  8.64  10.00  86.42  993,950.60 
6001+420.00  4.32  8.64  10.00  86.42  993,864.18 

406 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

6001+440.00  4.32  8.64  10.00  86.42  993,777.76 


6001+460.00  4.32  8.64  10.00  86.42  993,691.34 
6001+480.00  4.32  8.64  10.00  86.42  993,604.92 
6001+500.00  4.32  8.64  10.00  86.42  993,518.50 
6001+520.00  4.32  8.64  10.00  86.42  993,432.08 
6001+540.00  4.32  8.64  10.00  86.42  993,345.66 
6001+560.00  4.32  8.64  10.00  86.42  993,259.24 
6001+580.00  4.32  8.64  10.00  86.42  993,172.82 
6001+600.00  4.32  8.64  10.00  86.42  993,086.40 
6001+620.00  4.32  8.64  10.00  86.42  992,999.98 
6001+640.00  4.32  8.64  10.00  86.42  992,913.56 
6001+660.00  4.32  8.64  10.00  86.42  992,827.14 
6001+680.00  4.32  8.64  10.00  86.42  992,740.72 
6001+700.00  4.32  8.64  10.00  86.42  992,654.30 
6001+720.00  4.32  8.64  10.00  86.42  992,567.88 
6001+740.00  4.32  8.64  10.00  86.42  992,481.46 
6001+760.00  4.32  8.64  10.00  86.42  992,395.04 
6001+780.00  4.32  8.64  10.00  86.42  992,308.62 
6001+800.00  4.32  8.64  10.00  86.42  992,222.20 
6001+820.00  4.32  8.64  10.00  86.42  992,135.78 
6001+840.00  4.32  8.64  10.00  86.42  992,049.36 
6001+860.00  4.32  8.64  10.00  86.42  991,962.94 
6001+880.00  4.32  8.64  10.00  86.42  991,876.52 
6001+900.00  4.32  8.64  10.00  86.42  991,790.10 
6001+920.00  4.32  8.64  10.00  86.42  991,703.68 
6001+940.00  4.32  8.64  10.00  86.42  991,617.26 
6001+960.00  4.32  8.64  10.00  86.42  991,530.84 
6001+980.00  4.32  8.64  10.00  86.42  991,444.42 
6002+000.00  4.32  8.64  10.00  86.42  991,358.00 
6002+020.00  4.32  8.64  10.00  86.42  991,271.58 
6002+040.00  4.32  8.64  10.00  86.42  991,185.16 
6002+060.00  4.32  8.64  10.00  86.42  991,098.74 
6002+080.00  4.32  8.64  10.00  86.42  991,012.32 
6002+100.00  4.32  8.64  10.00  86.42  990,925.90 
6002+120.00  4.32  8.64  10.00  86.42  990,839.48 
6002+140.00  4.32  8.64  10.00  86.42  990,753.06 
6002+160.00  4.32  8.64  10.00  86.42  990,666.64 
6002+180.00  4.32  8.64  10.00  86.42  990,580.22 
6002+200.00  4.32  8.64  10.00  86.42  990,493.80 
6002+220.00  4.32  8.64  10.00  86.42  990,407.38 
6002+240.00  4.32  8.64  10.00  86.42  990,320.96 
6002+260.00  4.32  8.64  10.00  86.42  990,234.54 
6002+280.00  4.32  8.64  10.00  86.42  990,148.12 
6002+300.00  4.32  8.64  10.00  86.42  990,061.70 
6002+320.00  4.32  8.64  10.00  86.42  989,975.28 

407 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

6002+340.00  4.32  8.64  10.00  86.42  989,888.86 


6002+360.00  4.32  8.64  10.00  86.42  989,802.44 
6002+380.00  4.32  8.64  10.00  86.42  989,716.02 
6002+400.00  4.32  8.64  10.00  86.42  989,629.60 
6002+420.00  4.32  8.64  10.00  86.42  989,543.18 
6002+440.00  4.32  8.64  10.00  86.42  989,456.76 
6002+460.00  4.32  8.64  10.00  86.42  989,370.34 
6002+480.00  4.32  8.64  10.00  86.42  989,283.92 
6002+500.00  4.32  8.64  10.00  86.42  989,197.50 
6002+520.00  4.32  8.64  10.00  86.42  989,111.08 
6002+540.00  4.32  8.64  10.00  86.42  989,024.66 
6002+560.00  4.32  8.64  10.00  86.42  988,938.24 
6002+580.00  4.32  8.64  10.00  86.42  988,851.82 
6002+600.00  4.32  8.64  10.00  86.42  988,765.40 
6002+620.00  4.32  8.64  10.00  86.42  988,678.98 
6002+640.00  4.32  8.64  10.00  86.42  988,592.56 
6002+660.00  4.32  8.64  10.00  86.42  988,506.14 
6002+680.00  4.32  8.64  10.00  86.42  988,419.72 
6002+700.00  4.32  8.64  10.00  86.42  988,333.30 
6002+720.00  4.32  8.64  10.00  86.42  988,246.88 
6002+740.00  4.32  8.64  10.00  86.42  988,160.46 
6002+760.00  4.32  8.64  10.00  86.42  988,074.04 
6002+780.00  4.32  8.64  10.00  86.42  987,987.62 
6002+800.00  4.32  8.64  10.00  86.42  987,901.20 
6002+820.00  4.32  8.64  10.00  86.42  987,814.78 
6002+840.00  4.32  8.64  10.00  86.42  987,728.36 
6002+860.00  4.32  8.64  10.00  86.42  987,641.94 
6002+880.00  4.32  8.64  10.00  86.42  987,555.52 
6002+900.00  4.32  8.64  10.00  86.42  987,469.10 
6002+920.00  4.32  8.64  10.00  86.42  987,382.68 
6002+940.00  4.32  8.64  10.00  86.42  987,296.26 
6002+960.00  4.32  8.64  10.00  86.42  987,209.84 
6002+980.00  4.32  8.64  10.00  86.42  987,123.42 
6003+000.00  4.32  8.64  10.00  86.42  987,037.00 
6003+020.00  4.32  8.64  10.00  86.42  986,950.58 
6003+040.00  4.32  8.64  10.00  86.42  986,864.16 
6003+060.00  4.32  8.64  10.00  86.42  986,777.74 
6003+080.00  4.32  8.64  10.00  86.42  986,691.32 
6003+100.00  4.32  8.64  10.00  86.42  986,604.90 
6003+120.00  4.32  8.64  10.00  86.42  986,518.48 
6003+140.00  4.32  8.64  10.00  86.42  986,432.06 
6003+160.00  4.32  8.64  10.00  86.42  986,345.64 
6003+180.00  4.32  8.64  10.00  86.42  986,259.22 
6003+200.00  4.32  8.64  10.00  86.42  986,172.80 
6003+220.00  4.32  8.64  10.00  86.42  986,086.38 

408 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

6003+240.00  4.32  8.64  10.00  86.42  985,999.96 


6003+260.00  4.32  8.64  10.00  86.42  985,913.54 
6003+280.00  4.32  8.64  10.00  86.42  985,827.12 
6003+300.00  4.32  8.64  10.00  86.42  985,740.70 
6003+320.00  4.32  8.64  10.00  86.42  985,654.28 
6003+340.00  4.32  8.64  10.00  86.42  985,567.86 
6003+360.00  4.32  8.64  10.00  86.42  985,481.44 
6003+380.00  4.32  8.64  10.00  86.42  985,395.02 
6003+400.00  4.32  8.64  10.00  86.42  985,308.60 
6003+420.00  4.32  8.64  10.00  86.42  985,222.18 
6003+440.00  4.32  8.64  10.00  86.42  985,135.76 
6003+460.00  4.32  8.64  10.00  86.42  985,049.34 
6003+480.00  4.32  8.64  10.00  86.42  984,962.92 
6003+500.00  4.32  8.64  10.00  86.42  984,876.50 
6003+520.00  4.32  8.64  10.00  86.42  984,790.08 
6003+540.00  4.32  8.64  10.00  86.42  984,703.66 
6003+560.00  4.32  8.64  10.00  86.42  984,617.24 
6003+580.00  4.32  8.64  10.00  86.42  984,530.82 
6003+600.00  4.32  8.64  10.00  86.42  984,444.40 
6003+620.00  4.32  8.64  10.00  86.42  984,357.98 
6003+640.00  4.32  8.64  10.00  86.42  984,271.56 
6003+660.00  4.32  8.64  10.00  86.42  984,185.14 
6003+680.00  4.32  8.64  10.00  86.42  984,098.72 
6003+700.00  4.32  8.64  10.00  86.42  984,012.30 
6003+720.00  4.32  8.64  10.00  86.42  983,925.88 
6003+740.00  4.32  8.64  10.00  86.42  983,839.46 
6003+760.00  4.32  8.64  10.00  86.42  983,753.04 
6003+780.00  4.32  8.64  10.00  86.42  983,666.62 
6003+800.00  4.32  8.64  10.00  86.42  983,580.20 
6003+820.00  4.32  8.64  10.00  86.42  983,493.78 
6003+840.00  4.32  8.64  10.00  86.42  983,407.36 
6003+860.00  4.32  8.64  10.00  86.42  983,320.94 
6003+880.00  4.32  8.64  10.00  86.42  983,234.52 
6003+900.00  4.32  8.64  10.00  86.42  983,148.10 
6003+920.00  4.32  8.64  10.00  86.42  983,061.68 
6003+940.00  4.32  8.64  10.00  86.42  982,975.26 
6003+960.00  4.32  8.64  10.00  86.42  982,888.84 
6003+980.00  4.32  8.64  10.00  86.42  982,802.42 
6004+000.00  4.32  8.64  10.00  86.42  982,716.00 
6004+020.00  4.32  8.64  10.00  86.42  982,629.58 
6004+040.00  4.32  8.64  10.00  86.42  982,543.16 
6004+060.00  4.32  8.64  10.00  86.42  982,456.74 
6004+080.00  4.32  8.64  10.00  86.42  982,370.32 
6004+100.00  4.32  8.64  10.00  86.42  982,283.90 
6004+120.00  4.32  8.64  10.00  86.42  982,197.48 

409 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen 


Cadenamiento  a1+a2  Ordenada 
Subrasante distancia  Subrasante 
 
TRAMO DEL KM. 5070+000 AL 6005+000  

6004+140.00  4.32  8.64  10.00  86.42  982,111.06 


6004+160.00  4.32  8.64  10.00  86.42  982,024.64 
6004+180.00  4.32  8.64  10.00  86.42  981,938.22 
6004+200.00  4.32  8.64  10.00  86.42  981,851.80 
6004+220.00  4.32  8.64  10.00  86.42  981,765.38 
6004+240.00  4.32  8.64  10.00  86.42  981,678.96 
6004+260.00  4.32  8.64  10.00  86.42  981,592.54 
6004+280.00  4.32  8.64  10.00  86.42  981,506.12 
6004+300.00  4.32  8.64  10.00  86.42  981,419.70 
6004+320.00  4.32  8.64  10.00  86.42  981,333.28 
6004+340.00  4.32  8.64  10.00  86.42  981,246.86 
6004+360.00  4.32  8.64  10.00  86.42  981,160.44 
6004+380.00  4.32  8.64  10.00  86.42  981,074.02 
6004+400.00  4.32  8.64  10.00  86.42  980,987.60 
6004+420.00  4.32  8.64  10.00  86.42  980,901.18 
6004+440.00  4.32  8.64  10.00  86.42  980,814.76 
6004+460.00  4.32  8.64  10.00  86.42  980,728.34 
6004+480.00  4.32  8.64  10.00  86.42  980,641.92 
6004+500.00  4.32  8.64  10.00  86.42  980,555.50 
6004+520.00  4.32  8.64  10.00  86.42  980,469.08 
6004+540.00  4.32  8.64  10.00  86.42  980,382.66 
6004+560.00  4.32  8.64  10.00  86.42  980,296.24 
6004+580.00  4.32  8.64  10.00  86.42  980,209.82 
6004+600.00  4.32  8.64  10.00  86.42  980,123.40 
6004+620.00  4.32  8.64  10.00  86.42  980,036.98 
6004+640.00  4.32  8.64  10.00  86.42  979,950.56 
6004+660.00  4.32  8.64  10.00  86.42  979,864.14 
6004+680.00  4.32  8.64  10.00  86.42  979,777.72 
6004+700.00  4.32  8.64  10.00  86.42  979,691.30 
6004+720.00  4.32  8.64  10.00  86.42  979,604.88 
6004+740.00  4.32  8.64  10.00  86.42  979,518.46 
6004+760.00  4.32  8.64  10.00  86.42  979,432.04 
6004+780.00  4.32  8.64  10.00  86.42  979,345.62 
6004+800.00  4.32  8.64  10.00  86.42  979,259.20 
6004+820.00  4.32  8.64  10.00  86.42  979,172.78 
6004+840.00  4.32  8.64  10.00  86.42  979,086.36 
6004+860.00  4.32  8.64  10.00  86.42  978,999.94 
6004+880.00  4.32  8.64  10.00  86.42  978,913.52 
6004+900.00  4.32  8.64  10.00  86.42  978,827.10 
6004+920.00  4.32  8.64  10.00  86.42  978,740.68 
6004+940.00  4.32  8.64  10.00  86.42  978,654.26 
6004+960.00  4.32  8.64  10.00  86.42  978,567.84 
6004+980.00  4.32  8.64  10.00  86.42  978,481.42 
6005+000.00  4.32  8.64  10.00  86.42  978,395.00 
 

410 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TABLA 34 CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 6017+000 AL 6030+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6017+000.00  4.16  4.16        1,300,000.00 


6017+020.00  4.16  8.32  10.00  83.22  1,299,916.78 
6017+027.24  4.16  8.32  3.62  30.12  1,299,886.66 
6017+040.00  4.16  8.32  6.38  53.10  1,299,833.56 
6017+060.00  4.16  8.32  10.00  83.22  1,299,750.34 
6017+080.00  4.16  8.32  10.00  83.22  1,299,667.12 
6017+100.00  4.16  8.32  10.00  83.22  1,299,583.90 
6017+120.00  4.16  8.32  10.00  83.22  1,299,500.68 
6017+140.00  4.16  8.32  10.00  83.22  1,299,417.46 
6017+160.00  4.16  8.32  10.00  83.22  1,299,334.24 
6017+180.00  4.16  8.32  10.00  83.22  1,299,251.02 
6017+200.00  4.16  8.32  10.00  83.22  1,299,167.80 
6017+220.00  4.16  8.32  10.00  83.22  1,299,084.58 
6017+240.00  4.16  8.32  10.00  83.22  1,299,001.36 
6017+260.00  4.16  8.32  10.00  83.22  1,298,918.14 
6017+280.00  4.16  8.32  10.00  83.22  1,298,834.92 
6017+300.00  4.16  8.32  10.00  83.22  1,298,751.70 
6017+320.00  4.16  8.32  10.00  83.22  1,298,668.48 
6017+340.00  4.16  8.32  10.00  83.22  1,298,585.26 
6017+360.00  4.16  8.32  10.00  83.22  1,298,502.04 
6017+380.00  4.16  8.32  10.00  83.22  1,298,418.82 
6017+400.00  4.16  8.32  10.00  83.22  1,298,335.60 
6017+420.00  4.16  8.32  10.00  83.22  1,298,252.38 
6017+440.00  4.16  8.32  10.00  83.22  1,298,169.16 
6017+460.00  4.16  8.32  10.00  83.22  1,298,085.94 
6017+480.00  4.16  8.32  10.00  83.22  1,298,002.72 
6017+500.00  4.16  8.32  10.00  83.22  1,297,919.50 
6017+520.00  4.16  8.32  10.00  83.22  1,297,836.28 
6017+540.00  4.16  8.32  10.00  83.22  1,297,753.06 
6017+560.00  4.16  8.32  10.00  83.22  1,297,669.84 
6017+579.55  4.16  8.32  9.78  81.36  1,297,588.48 
6017+580.00  4.16  8.32  0.22  1.86  1,297,586.62 
6017+600.00  4.16  8.32  10.00  83.22  1,297,503.40 
6017+606.68  4.16  8.32  3.34  27.80  1,297,475.60 
6017+606.68  0.00  4.16  0.00  0.00  1,297,475.60 
6017+606.68  0.00  0.00  0.00  0.00  1,297,475.60 
6017+620.00  0.00  0.00  6.66  0.00  1,297,475.60 
6017+640.00  0.00  0.00  10.00  0.00  1,297,475.60 
6017+660.00  0.00  0.00  10.00  0.00  1,297,475.60 
6017+670.68  0.00  0.00  5.34  0.00  1,297,475.60 
6017+670.68  0.00  0.00  0.00  0.00  1,297,475.60 
6017+670.68  4.16  4.16  0.00  0.00  1,297,475.60 
6017+680.00  4.16  8.32  4.66  38.77  1,297,436.82 

411 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6017+700.00  4.16  8.32  10.00  83.22  1,297,353.60 


6017+720.00  4.16  8.32  10.00  83.22  1,297,270.38 
6017+729.55  4.16  8.32  4.78  39.75  1,297,230.63 
6017+740.00  4.16  8.32  5.22  43.47  1,297,187.16 
6017+760.00  4.16  8.32  10.00  83.22  1,297,103.94 
6017+780.00  4.16  8.32  10.00  83.22  1,297,020.72 
6017+800.00  4.16  8.32  10.00  83.22  1,296,937.50 
6017+820.00  4.16  8.32  10.00  83.22  1,296,854.28 
6017+840.00  4.16  8.32  10.00  83.22  1,296,771.06 
6017+860.00  4.16  8.32  10.00  83.22  1,296,687.84 
6017+880.00  4.16  8.32  10.00  83.22  1,296,604.62 
6017+900.00  4.16  8.32  10.00  83.22  1,296,521.40 
6017+902.74  4.16  8.32  1.37  11.41  1,296,509.99 
6017+920.00  4.16  8.32  8.63  71.81  1,296,438.18 
6017+940.00  4.16  8.32  10.00  83.22  1,296,354.96 
6017+960.00  4.16  8.32  10.00  83.22  1,296,271.74 
6017+980.00  4.16  8.32  10.00  83.22  1,296,188.52 
6018+000.00  4.16  8.32  10.00  83.22  1,296,105.30 
6018+020.00  4.16  8.32  10.00  83.22  1,296,022.08 
6018+040.00  4.16  8.32  10.00  83.22  1,295,938.86 
6018+052.74  4.16  8.32  6.37  53.02  1,295,885.84 
6018+060.00  4.16  8.32  3.63  30.20  1,295,855.64 
6018+080.00  4.16  8.32  10.00  83.22  1,295,772.42 
6018+100.00  4.16  8.32  10.00  83.22  1,295,689.20 
6018+120.00  4.16  8.32  10.00  83.22  1,295,605.98 
6018+140.00  4.16  8.32  10.00  83.22  1,295,522.76 
6018+160.00  4.16  8.32  10.00  83.22  1,295,439.54 
6018+180.00  4.16  8.32  10.00  83.22  1,295,356.32 
6018+200.00  4.16  8.32  10.00  83.22  1,295,273.10 
6018+220.00  4.16  8.32  10.00  83.22  1,295,189.88 
6018+240.00  4.16  8.32  10.00  83.22  1,295,106.66 
6018+250.00  4.16  8.32  5.00  41.61  1,295,065.05 
6018+250.00  4.16  8.32  0.00  0.00  1,295,065.05 
6018+260.00  4.16  8.32  5.00  41.61  1,295,023.44 
6018+280.00  4.16  8.32  10.00  83.22  1,294,940.22 
6018+300.00  4.16  8.32  10.00  83.22  1,294,857.00 
6018+320.00  4.16  8.32  10.00  83.22  1,294,773.78 
6018+340.00  4.16  8.32  10.00  83.22  1,294,690.56 
6018+360.00  4.16  8.32  10.00  83.22  1,294,607.34 
6018+380.00  4.16  8.32  10.00  83.22  1,294,524.12 
6018+400.00  4.16  8.32  10.00  83.22  1,294,440.90 
6018+420.00  4.16  8.32  10.00  83.22  1,294,357.68 
6018+440.00  4.16  8.32  10.00  83.22  1,294,274.46 
6018+460.00  4.16  8.32  10.00  83.22  1,294,191.24 
6018+480.00  4.16  8.32  10.00  83.22  1,294,108.02 

412 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6018+500.00  4.16  8.32  10.00  83.22  1,294,024.80 


6018+520.00  4.16  8.32  10.00  83.22  1,293,941.58 
6018+540.00  4.16  8.32  10.00  83.22  1,293,858.36 
6018+560.00  4.16  8.32  10.00  83.22  1,293,775.14 
6018+580.00  4.16  8.32  10.00  83.22  1,293,691.92 
6018+600.00  4.16  8.32  10.00  83.22  1,293,608.70 
6018+620.00  4.16  8.32  10.00  83.22  1,293,525.48 
6018+640.00  4.16  8.32  10.00  83.22  1,293,442.26 
6018+660.00  4.16  8.32  10.00  83.22  1,293,359.04 
6018+680.00  4.16  8.32  10.00  83.22  1,293,275.82 
6018+700.00  4.16  8.32  10.00  83.22  1,293,192.60 
6018+720.00  4.16  8.32  10.00  83.22  1,293,109.38 
6018+727.00  4.20  8.36  3.50  29.25  1,293,080.13 
6018+740.00  4.31  8.51  6.50  55.28  1,293,024.85 
6018+747.00  4.37  8.68  3.50  30.37  1,292,994.48 
6018+757.00  4.41  8.78  5.00  43.88  1,292,950.60 
6018+760.00  4.44  8.85  1.50  13.27  1,292,937.33 
6018+767.00  4.52  8.97  3.50  31.38  1,292,905.95 
6018+777.00  4.72  9.24  5.00  46.20  1,292,859.75 
6018+780.00  4.80  9.51  1.50  14.27  1,292,845.48 
6018+787.00  4.98  9.77  3.50  34.21  1,292,811.27 
6018+797.00  5.25  10.23  5.00  51.14  1,292,760.13 
6018+800.00  5.33  10.58  1.50  15.87  1,292,744.26 
6018+807.00  5.52  10.85  3.50  37.98  1,292,706.28 
6018+817.00  5.79  11.31  5.00  56.57  1,292,649.71 
6018+820.00  5.87  11.66  1.50  17.49  1,292,632.22 
6018+827.00  6.05  11.92  3.50  41.73  1,292,590.49 
6018+837.00  6.25  12.30  5.00  61.50  1,292,528.99 
6018+840.00  6.28  12.53  1.50  18.79  1,292,510.20 
6018+847.00  6.36  12.64  3.50  44.25  1,292,465.96 
6018+857.00  6.40  12.76  5.00  63.81  1,292,402.15 
6018+860.00  6.40  12.80  1.50  19.20  1,292,382.95 
6018+867.00  6.40  12.80  3.50  44.79  1,292,338.16 
6018+880.00  6.40  12.80  6.50  83.19  1,292,254.97 
6018+900.00  6.40  12.80  10.00  127.98  1,292,126.99 
6018+920.00  6.40  12.80  10.00  127.98  1,291,999.01 
6018+940.00  6.40  12.80  10.00  127.98  1,291,871.03 
6018+960.00  6.40  12.80  10.00  127.98  1,291,743.05 
6018+980.00  6.40  12.80  10.00  127.98  1,291,615.07 
6019+000.00  6.40  12.80  10.00  127.98  1,291,487.09 
6019+020.00  6.40  12.80  10.00  127.98  1,291,359.11 
6019+040.00  6.40  12.80  10.00  127.98  1,291,231.13 
6019+060.00  6.40  12.80  10.00  127.98  1,291,103.15 
6019+070.00  6.40  12.80  5.00  63.99  1,291,039.16 
6019+070.00  6.40  12.80  0.00  0.00  1,291,039.16 

413 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6019+080.00  6.40  12.80  5.00  63.99  1,290,975.17 


6019+100.00  6.40  12.80  10.00  127.98  1,290,847.19 
6019+120.00  6.40  12.80  10.00  127.98  1,290,719.21 
6019+140.00  6.40  12.80  10.00  127.98  1,290,591.23 
6019+160.00  6.40  12.80  10.00  127.98  1,290,463.25 
6019+160.00  6.40  12.80  0.00  0.00  1,290,463.25 
6019+180.00  6.40  12.80  10.00  127.98  1,290,335.27 
6019+200.00  6.40  12.80  10.00  127.98  1,290,207.29 
6019+220.00  6.40  12.80  10.00  127.98  1,290,079.31 
6019+240.00  6.40  12.80  10.00  127.98  1,289,951.33 
6019+247.00  6.40  12.80  3.50  44.79  1,289,906.54 
6019+257.00  6.40  12.80  5.00  63.99  1,289,842.55 
6019+260.00  6.39  12.79  1.50  19.18  1,289,823.37 
6019+267.00  6.36  12.75  3.50  44.62  1,289,778.75 
6019+277.00  6.24  12.60  5.00  63.02  1,289,715.73 
6019+280.00  6.19  12.43  1.50  18.64  1,289,697.09 
6019+287.00  6.05  12.23  3.50  42.82  1,289,654.27 
6019+297.00  5.79  11.84  5.00  59.18  1,289,595.09 
6019+300.00  5.71  11.49  1.50  17.24  1,289,577.85 
6019+307.00  5.52  11.22  3.50  39.28  1,289,538.57 
6019+317.00  5.25  10.76  5.00  53.81  1,289,484.77 
6019+320.00  5.16  10.41  1.50  15.61  1,289,469.16 
6019+327.00  4.97  10.14  3.50  35.48  1,289,433.67 
6019+337.00  4.71  9.69  5.00  48.44  1,289,385.24 
6019+340.00  4.66  9.37  1.50  14.05  1,289,371.18 
6019+347.00  4.52  9.18  3.50  32.12  1,289,339.06 
6019+357.00  4.41  8.93  5.00  44.64  1,289,294.43 
6019+360.00  4.40  8.80  1.50  13.20  1,289,281.23 
6019+366.83  4.37  8.76  3.42  29.94  1,289,251.29 
6019+380.00  4.23  8.59  6.58  56.58  1,289,194.71 
6019+386.83  4.16  8.39  3.42  28.65  1,289,166.06 
6019+400.00  4.16  8.32  6.58  54.79  1,289,111.27 
6019+420.00  4.16  8.32  10.00  83.22  1,289,028.05 
6019+440.00  4.16  8.32  10.00  83.22  1,288,944.83 
6019+460.00  4.16  8.32  10.00  83.22  1,288,861.61 
6019+480.00  4.16  8.32  10.00  83.22  1,288,778.39 
6019+500.00  4.16  8.32  10.00  83.22  1,288,695.17 
6019+520.00  4.16  8.32  10.00  83.22  1,288,611.95 
6019+540.00  4.16  8.32  10.00  83.22  1,288,528.73 
6019+560.00  4.16  8.32  10.00  83.22  1,288,445.51 
6019+570.00  4.16  8.32  5.00  41.61  1,288,403.90 
6019+580.00  4.25  8.42  5.00  42.08  1,288,361.82 
6019+590.00  4.37  8.62  5.00  43.12  1,288,318.71 
6019+600.00  4.39  8.76  5.00  43.78  1,288,274.93 
6019+610.00  4.44  8.82  5.00  44.11  1,288,230.82 

414 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6019+620.00  4.52  8.96  5.00  44.79  1,288,186.04 


6019+630.00  4.64  9.16  5.00  45.80  1,288,140.24 
6019+640.00  4.79  9.43  5.00  47.16  1,288,093.08 
6019+650.00  4.98  9.77  5.00  48.85  1,288,044.23 
6019+660.00  5.18  10.16  5.00  50.80  1,287,993.43 
6019+670.00  5.38  10.57  5.00  52.83  1,287,940.60 
6019+680.00  5.59  10.97  5.00  54.86  1,287,885.75 
6019+690.00  5.79  11.38  5.00  56.89  1,287,828.86 
6019+700.00  5.98  11.77  5.00  58.84  1,287,770.03 
6019+710.00  6.13  12.11  5.00  60.53  1,287,709.50 
6019+720.00  6.25  12.38  5.00  61.88  1,287,647.62 
6019+730.00  6.33  12.58  5.00  62.90  1,287,584.72 
6019+740.00  6.38  12.72  5.00  63.58  1,287,521.15 
6019+750.00  6.40  12.78  5.00  63.91  1,287,457.24 
6019+760.00  6.40  12.80  5.00  63.99  1,287,393.25 
6019+770.00  6.40  12.80  5.00  63.99  1,287,329.26 
6019+780.00  6.40  12.80  5.00  63.99  1,287,265.27 
6019+800.00  6.40  12.80  10.00  127.98  1,287,137.29 
6019+820.00  6.40  12.80  10.00  127.98  1,287,009.31 
6019+840.00  6.40  12.80  10.00  127.98  1,286,881.33 
6019+860.00  6.40  12.80  10.00  127.98  1,286,753.35 
6019+880.00  6.40  12.80  10.00  127.98  1,286,625.37 
6019+900.00  6.40  12.80  10.00  127.98  1,286,497.39 
6019+920.00  6.40  12.80  10.00  127.98  1,286,369.41 
6019+940.00  6.40  12.80  10.00  127.98  1,286,241.43 
6019+960.00  6.40  12.80  10.00  127.98  1,286,113.45 
6019+980.00  6.40  12.80  10.00  127.98  1,285,985.47 
6020+000.00  6.40  12.80  10.00  127.98  1,285,857.49 
6020+020.00  6.40  12.80  10.00  127.98  1,285,729.51 
6020+040.00  6.40  12.80  10.00  127.98  1,285,601.53 
6020+060.00  6.40  12.80  10.00  127.98  1,285,473.55 
6020+080.00  6.40  12.80  10.00  127.98  1,285,345.57 
6020+100.00  6.40  12.80  10.00  127.98  1,285,217.59 
6020+120.00  6.40  12.80  10.00  127.98  1,285,089.61 
6020+140.00  6.40  12.80  10.00  127.98  1,284,961.63 
6020+160.00  6.40  12.80  10.00  127.98  1,284,833.65 
6020+180.00  6.40  12.80  10.00  127.98  1,284,705.67 
6020+200.00  6.40  12.80  10.00  127.98  1,284,577.69 
6020+220.00  6.40  12.80  10.00  127.98  1,284,449.71 
6020+240.00  6.40  12.80  10.00  127.98  1,284,321.73 
6020+260.00  6.40  12.80  10.00  127.98  1,284,193.75 
6020+280.00  6.40  12.80  10.00  127.98  1,284,065.77 
6020+300.00  6.40  12.80  10.00  127.98  1,283,937.79 
6020+320.00  6.40  12.80  10.00  127.98  1,283,809.81 
6020+340.00  6.40  12.80  10.00  127.98  1,283,681.83 

415 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6020+360.00  6.40  12.80  10.00  127.98  1,283,553.85 


6020+380.00  6.40  12.80  10.00  127.98  1,283,425.87 
6020+400.00  6.40  12.80  10.00  127.98  1,283,297.89 
6020+420.00  6.40  12.80  10.00  127.98  1,283,169.91 
6020+440.00  6.40  12.80  10.00  127.98  1,283,041.93 
6020+460.00  6.40  12.80  10.00  127.98  1,282,913.95 
6020+480.00  6.40  12.80  10.00  127.99  1,282,785.96 
6020+500.00  6.40  12.80  10.00  127.99  1,282,657.97 
6020+520.00  6.40  12.80  10.00  127.99  1,282,529.98 
6020+540.00  6.40  12.80  10.00  128.00  1,282,401.98 
6020+560.00  6.40  12.80  10.00  127.99  1,282,273.99 
6020+580.00  6.40  12.80  10.00  127.98  1,282,146.01 
6020+600.00  6.40  12.80  10.00  127.99  1,282,018.02 
6020+620.00  6.40  12.80  10.00  128.00  1,281,890.02 
6020+640.00  6.40  12.80  10.00  128.00  1,281,762.02 
6020+660.00  6.40  12.80  10.00  127.99  1,281,634.03 
6020+680.00  6.40  12.80  10.00  127.99  1,281,506.04 
6020+700.00  6.40  12.80  10.00  128.00  1,281,378.04 
6020+720.00  6.40  12.80  10.00  127.99  1,281,250.05 
6020+740.00  6.40  12.80  10.00  127.99  1,281,122.06 
6020+760.00  6.40  12.80  10.00  128.00  1,280,994.06 
6020+780.00  6.40  12.80  10.00  127.99  1,280,866.07 
6020+800.00  6.40  12.80  10.00  127.99  1,280,738.08 
6020+820.00  6.40  12.80  10.00  128.00  1,280,610.08 
6020+840.00  6.40  12.80  10.00  128.00  1,280,482.08 
6020+860.00  6.40  12.80  10.00  127.99  1,280,354.09 
6020+880.00  6.40  12.80  10.00  127.99  1,280,226.10 
6020+880.00  6.40  12.80  0.00  0.00  1,280,226.10 
6020+900.00  6.40  12.80  10.00  128.00  1,280,098.10 
6020+920.00  6.40  12.80  10.00  127.99  1,279,970.11 
6020+940.00  6.40  12.80  10.00  127.99  1,279,842.12 
6020+960.00  6.40  12.80  10.00  128.00  1,279,714.12 
6020+980.00  6.40  12.80  10.00  128.00  1,279,586.12 
6021+000.00  6.40  12.80  10.00  127.99  1,279,458.13 
6021+020.00  6.40  12.80  10.00  127.99  1,279,330.14 
6021+040.00  6.40  12.80  10.00  128.00  1,279,202.14 
6021+060.00  6.40  12.80  10.00  127.99  1,279,074.15 
6021+080.00  6.40  12.80  10.00  127.99  1,278,946.16 
6021+100.00  6.40  12.80  10.00  128.00  1,278,818.16 
6021+120.00  6.40  12.80  10.00  127.99  1,278,690.17 
6021+140.00  6.40  12.80  10.00  127.98  1,278,562.19 
6021+160.00  6.40  12.80  10.00  127.98  1,278,434.21 
6021+180.00  6.40  12.80  10.00  127.99  1,278,306.22 
6021+200.00  6.40  12.80  10.00  128.00  1,278,178.22 
6021+220.00  6.40  12.80  10.00  127.99  1,278,050.23 

416 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6021+240.00  6.40  12.80  10.00  127.99  1,277,922.24 


6021+250.00  6.40  12.80  5.00  64.00  1,277,858.24 
6021+260.00  6.38  12.78  5.00  63.92  1,277,794.32 
6021+270.00  6.33  12.72  5.00  63.58  1,277,730.75 
6021+280.00  6.25  12.58  5.00  62.90  1,277,667.85 
6021+290.00  6.13  12.38  5.00  61.88  1,277,605.97 
6021+300.00  5.98  12.11  5.00  60.53  1,277,545.45 
6021+310.00  5.79  11.77  5.00  58.83  1,277,486.62 
6021+320.00  5.59  11.38  5.00  56.89  1,277,429.73 
6021+330.00  5.38  10.97  5.00  54.86  1,277,374.88 
6021+340.00  5.18  10.57  5.00  52.83  1,277,322.05 
6021+350.00  4.98  10.16  5.00  50.80  1,277,271.26 
6021+360.00  4.79  9.77  5.00  48.85  1,277,222.41 
6021+370.00  4.64  9.43  5.00  47.16  1,277,175.25 
6021+380.00  4.52  9.16  5.00  45.80  1,277,129.46 
6021+390.00  4.44  8.96  5.00  44.78  1,277,084.68 
6021+400.00  4.39  8.82  5.00  44.11  1,277,040.57 
6021+409.97  4.37  8.76  4.99  43.65  1,276,996.92 
6021+420.00  4.25  8.62  5.01  43.24  1,276,953.68 
6021+429.97  4.16  8.42  4.99  41.95  1,276,911.73 
6021+440.00  4.16  8.32  5.01  41.73  1,276,870.00 
6021+455.00  4.16  8.32  7.50  62.42  1,276,807.58 
6021+455.00  4.16  8.32  0.00  0.00  1,276,807.58 
6021+460.00  4.16  8.32  2.50  20.81  1,276,786.78 
6021+480.00  4.16  8.32  10.00  83.22  1,276,703.56 
6021+500.00  4.16  8.32  10.00  83.22  1,276,620.34 
6021+520.00  4.16  8.32  10.00  83.22  1,276,537.12 
6021+540.00  4.16  8.32  10.00  83.22  1,276,453.90 
6021+560.00  4.16  8.32  10.00  83.22  1,276,370.68 
6021+580.00  4.16  8.32  10.00  83.22  1,276,287.46 
6021+600.00  4.16  8.32  10.00  83.22  1,276,204.24 
6021+620.00  4.16  8.32  10.00  83.22  1,276,121.02 
6021+640.00  4.16  8.32  10.00  83.22  1,276,037.80 
6021+660.00  4.16  8.32  10.00  83.22  1,275,954.58 
6021+680.00  4.16  8.32  10.00  83.22  1,275,871.36 
6021+700.00  4.16  8.32  10.00  83.22  1,275,788.14 
6021+702.74  4.16  8.32  1.37  11.41  1,275,776.73 
6021+720.00  4.16  8.32  8.63  71.81  1,275,704.92 
6021+740.00  4.16  8.32  10.00  83.22  1,275,621.70 
6021+760.00  4.16  8.32  10.00  83.22  1,275,538.48 
6021+775.00  4.16  8.32  7.50  62.42  1,275,476.06 
6021+775.00  4.16  8.32  0.00  0.00  1,275,476.06 
6021+780.00  4.16  8.32  2.50  20.81  1,275,455.26 
6021+800.00  4.16  8.32  10.00  83.22  1,275,372.04 
6021+820.00  4.16  8.32  10.00  83.22  1,275,288.82 

417 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6021+840.00  4.16  8.32  10.00  83.22  1,275,205.60 


6021+852.74  4.16  8.32  6.37  53.02  1,275,152.58 
6021+860.00  4.16  8.32  3.63  30.20  1,275,122.38 
6021+880.00  4.16  8.32  10.00  83.22  1,275,039.16 
6021+900.00  4.16  8.32  10.00  83.22  1,274,955.94 
6021+920.00  4.16  8.32  10.00  83.22  1,274,872.72 
6021+940.00  4.16  8.32  10.00  83.22  1,274,789.50 
6021+960.00  4.16  8.32  10.00  83.22  1,274,706.28 
6021+980.00  4.16  8.32  10.00  83.22  1,274,623.06 
6022+000.00  4.16  8.32  10.00  83.22  1,274,539.84 
6022+020.00  4.16  8.32  10.00  83.22  1,274,456.62 
6022+040.00  4.16  8.32  10.00  83.22  1,274,373.40 
6022+060.00  4.16  8.32  10.00  83.22  1,274,290.18 
6022+080.00  4.16  8.32  10.00  83.22  1,274,206.96 
6022+095.00  4.16  8.32  7.50  62.42  1,274,144.54 
6022+095.00  4.16  8.32  0.00  0.00  1,274,144.54 
6022+100.00  4.16  8.32  2.50  20.81  1,274,123.74 
6022+100.00  4.16  8.32  0.00  0.00  1,274,123.73 
6022+120.00  4.16  8.32  10.00  83.22  1,274,040.52 
6022+140.00  4.16  8.32  10.00  83.22  1,273,957.30 
6022+160.00  4.16  8.32  10.00  83.22  1,273,874.08 
6022+170.00  4.16  8.32  5.00  41.61  1,273,832.47 
6022+170.00  4.16  8.32  0.00  0.00  1,273,832.47 
6022+180.00  4.16  8.32  5.00  41.61  1,273,790.86 
6022+200.00  4.16  8.32  10.00  83.22  1,273,707.64 
6022+220.00  4.16  8.32  10.00  83.22  1,273,624.42 
6022+240.00  4.16  8.32  10.00  83.22  1,273,541.20 
6022+260.00  4.16  8.32  10.00  83.22  1,273,457.98 
6022+280.00  4.16  8.32  10.00  83.22  1,273,374.76 
6022+300.00  4.16  8.32  10.00  83.22  1,273,291.54 
6022+320.00  4.16  8.32  10.00  83.22  1,273,208.32 
6022+340.00  4.16  8.32  10.00  83.22  1,273,125.10 
6022+360.00  4.16  8.32  10.00  83.22  1,273,041.88 
6022+380.00  4.16  8.32  10.00  83.22  1,272,958.66 
6022+400.00  4.16  8.32  10.00  83.22  1,272,875.44 
6022+420.00  4.16  8.32  10.00  83.22  1,272,792.22 
6022+440.00  4.16  8.32  10.00  83.22  1,272,709.00 
6022+460.00  4.16  8.32  10.00  83.22  1,272,625.78 
6022+480.00  4.16  8.32  10.00  83.22  1,272,542.56 
6022+500.00  4.16  8.32  10.00  83.22  1,272,459.34 
6022+520.00  4.16  8.32  10.00  83.22  1,272,376.12 
6022+540.00  4.16  8.32  10.00  83.22  1,272,292.90 
6022+560.00  4.16  8.32  10.00  83.22  1,272,209.68 
6022+580.00  4.16  8.32  10.00  83.22  1,272,126.46 
6022+600.00  4.16  8.32  10.00  83.22  1,272,043.24 

418 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6022+620.00  4.16  8.32  10.00  83.22  1,271,960.02 


6022+640.00  4.16  8.32  10.00  83.22  1,271,876.80 
6022+660.00  4.16  8.32  10.00  83.22  1,271,793.58 
6022+680.00  4.16  8.32  10.00  83.22  1,271,710.36 
6022+700.00  4.16  8.32  10.00  83.22  1,271,627.14 
6022+720.00  4.16  8.32  10.00  83.22  1,271,543.92 
6022+740.00  4.16  8.32  10.00  83.22  1,271,460.70 
6022+760.00  4.16  8.32  10.00  83.22  1,271,377.48 
6022+780.00  4.16  8.32  10.00  83.22  1,271,294.26 
6022+800.00  4.16  8.32  10.00  83.22  1,271,211.04 
6022+820.00  4.16  8.32  10.00  83.22  1,271,127.82 
6022+840.00  4.16  8.32  10.00  83.22  1,271,044.60 
6022+860.00  4.16  8.32  10.00  83.22  1,270,961.38 
6022+880.00  4.16  8.32  10.00  83.22  1,270,878.16 
6022+900.00  4.16  8.32  10.00  83.22  1,270,794.94 
6022+920.00  4.16  8.32  10.00  83.22  1,270,711.72 
6022+940.00  4.16  8.32  10.00  83.22  1,270,628.50 
6022+960.00  4.16  8.32  10.00  83.22  1,270,545.28 
6022+980.00  4.16  8.32  10.00  83.22  1,270,462.06 
6023+000.00  4.16  8.32  10.00  83.22  1,270,378.84 
6023+020.00  4.16  8.32  10.00  83.22  1,270,295.62 
6023+040.00  4.16  8.32  10.00  83.22  1,270,212.40 
6023+060.00  4.16  8.32  10.00  83.22  1,270,129.18 
6023+080.00  4.16  8.32  10.00  83.22  1,270,045.96 
6023+100.00  4.16  8.32  10.00  83.22  1,269,962.74 
6023+120.00  4.16  8.32  10.00  83.22  1,269,879.52 
6023+140.00  4.16  8.32  10.00  83.22  1,269,796.30 
6023+160.00  4.16  8.32  10.00  83.22  1,269,713.08 
6023+180.00  4.16  8.32  10.00  83.22  1,269,629.86 
6023+200.00  4.16  8.32  10.00  83.22  1,269,546.64 
6023+220.00  4.16  8.32  10.00  83.22  1,269,463.42 
6023+240.00  4.16  8.32  10.00  83.22  1,269,380.20 
6023+260.00  4.16  8.32  10.00  83.22  1,269,296.98 
6023+280.00  4.16  8.32  10.00  83.22  1,269,213.76 
6023+300.00  4.16  8.32  10.00  83.22  1,269,130.54 
6023+320.00  4.16  8.32  10.00  83.22  1,269,047.32 
6023+340.00  4.16  8.32  10.00  83.22  1,268,964.10 
6023+360.00  4.16  8.32  10.00  83.22  1,268,880.88 
6023+380.00  4.16  8.32  10.00  83.22  1,268,797.66 
6023+400.00  4.16  8.32  10.00  83.22  1,268,714.44 
6023+420.00  4.16  8.32  10.00  83.22  1,268,631.22 
6023+440.00  4.16  8.32  10.00  83.22  1,268,548.00 
6023+460.00  4.16  8.32  10.00  83.22  1,268,464.78 
6023+480.00  4.16  8.32  10.00  83.22  1,268,381.56 
6023+500.00  4.16  8.32  10.00  83.22  1,268,298.34 

419 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6023+520.00  4.16  8.32  10.00  83.22  1,268,215.12 


6023+540.00  4.16  8.32  10.00  83.22  1,268,131.90 
6023+560.00  4.16  8.32  10.00  83.22  1,268,048.68 
6023+580.00  4.16  8.32  10.00  83.22  1,267,965.46 
6023+600.00  4.16  8.32  10.00  83.22  1,267,882.24 
6023+620.00  4.16  8.32  10.00  83.22  1,267,799.02 
6023+640.00  4.16  8.32  10.00  83.22  1,267,715.80 
6023+660.00  4.16  8.32  10.00  83.22  1,267,632.58 
6023+680.00  4.16  8.32  10.00  83.22  1,267,549.36 
6023+700.00  4.16  8.32  10.00  83.22  1,267,466.14 
6023+720.00  4.16  8.32  10.00  83.22  1,267,382.92 
6023+740.00  4.16  8.32  10.00  83.22  1,267,299.70 
6023+760.00  4.16  8.32  10.00  83.22  1,267,216.48 
6023+780.00  4.16  8.32  10.00  83.22  1,267,133.26 
6023+800.00  4.16  8.32  10.00  83.22  1,267,050.04 
6023+820.00  4.16  8.32  10.00  83.22  1,266,966.82 
6023+840.00  4.16  8.32  10.00  83.22  1,266,883.60 
6023+860.00  4.16  8.32  10.00  83.22  1,266,800.38 
6023+880.00  4.16  8.32  10.00  83.22  1,266,717.16 
6023+880.00  4.32  8.48  0.00  0.00  1,266,717.15 
6023+900.00  4.32  8.64  10.00  86.42  1,266,630.74 
6023+920.00  4.32  8.64  10.00  86.42  1,266,544.32 
6023+940.00  4.32  8.64  10.00  86.42  1,266,457.90 
6023+960.00  4.32  8.64  10.00  86.42  1,266,371.48 
6023+980.00  4.32  8.64  10.00  86.42  1,266,285.06 
6024+000.00  4.32  8.64  10.00  86.42  1,266,198.64 
6024+020.00  4.32  8.64  10.00  86.42  1,266,112.22 
6024+040.00  4.32  8.64  10.00  86.42  1,266,025.80 
6024+049.07  4.32  8.64  4.54  39.20  1,265,986.60 
6024+060.00  4.32  8.64  5.46  47.22  1,265,939.38 
6024+080.00  4.32  8.64  10.00  86.42  1,265,852.96 
6024+100.00  4.32  8.64  10.00  86.42  1,265,766.54 
6024+120.00  4.32  8.64  10.00  86.42  1,265,680.12 
6024+140.00  4.32  8.64  10.00  86.42  1,265,593.70 
6024+160.00  4.32  8.64  10.00  86.42  1,265,507.28 
6024+180.00  4.32  8.64  10.00  86.42  1,265,420.86 
6024+199.07  4.32  8.64  9.54  82.41  1,265,338.45 
6024+200.00  4.32  8.64  0.46  4.01  1,265,334.44 
6024+220.00  4.32  8.64  10.00  86.42  1,265,248.02 
6024+240.00  4.32  8.64  10.00  86.42  1,265,161.60 
6024+260.00  4.32  8.64  10.00  86.42  1,265,075.18 
6024+270.00  4.32  8.64  5.00  43.21  1,265,031.97 
6024+270.00  4.32  8.64  0.00  0.00  1,265,031.97 
6024+280.00  4.32  8.64  5.00  43.21  1,264,988.76 
6024+300.00  4.32  8.64  10.00  86.42  1,264,902.34 

420 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6024+316.48  4.32  8.64  8.24  71.23  1,264,831.11 


6024+320.00  4.32  8.64  1.76  15.19  1,264,815.92 
6024+340.00  4.32  8.64  10.00  86.42  1,264,729.50 
6024+360.00  4.32  8.64  10.00  86.42  1,264,643.08 
6024+376.40  4.32  8.64  8.20  70.87  1,264,572.21 
6024+376.40  6.35  6.35        1,300,000.00 
6024+380.00  6.35  12.70  1.80  22.85  1,299,977.15 
6024+400.00  6.35  12.70  10.00  126.96  1,299,850.19 
6024+420.00  6.35  12.70  10.00  126.96  1,299,723.23 
6024+440.00  6.35  12.70  10.00  126.96  1,299,596.27 
6024+460.00  6.35  12.70  10.00  126.96  1,299,469.31 
6024+480.00  6.35  12.70  10.00  126.96  1,299,342.35 
6024+500.00  6.35  12.70  10.00  126.96  1,299,215.39 
6024+520.00  6.35  12.70  10.00  126.96  1,299,088.43 
6024+540.00  6.35  12.70  10.00  126.96  1,298,961.47 
6024+560.00  6.35  12.70  10.00  126.96  1,298,834.51 
6024+580.00  6.35  12.70  10.00  126.96  1,298,707.55 
6024+600.00  6.35  12.70  10.00  126.96  1,298,580.59 
6024+620.00  6.35  12.70  10.00  126.96  1,298,453.63 
6024+640.00  6.35  12.70  10.00  126.96  1,298,326.67 
6024+660.00  6.35  12.70  10.00  126.96  1,298,199.71 
6024+680.00  6.35  12.70  10.00  126.96  1,298,072.75 
6024+700.00  6.35  12.70  10.00  126.96  1,297,945.79 
6024+720.00  6.35  12.70  10.00  126.96  1,297,818.83 
6024+740.00  6.35  12.70  10.00  126.96  1,297,691.87 
6024+760.00  6.35  12.70  10.00  126.96  1,297,564.91 
6024+780.00  6.35  12.70  10.00  126.96  1,297,437.95 
6024+800.00  6.35  12.70  10.00  126.96  1,297,310.99 
6024+820.00  6.35  12.70  10.00  126.96  1,297,184.03 
6024+840.00  6.35  12.70  10.00  126.97  1,297,057.06 
6024+860.00  6.35  12.70  10.00  126.97  1,296,930.09 
6024+880.00  6.35  12.70  10.00  126.96  1,296,803.13 
6024+900.00  6.35  12.70  10.00  126.96  1,296,676.17 
6024+920.00  6.35  12.70  10.00  126.97  1,296,549.20 
6024+940.00  6.35  12.70  10.00  126.97  1,296,422.23 
6024+960.00  6.35  12.70  10.00  126.96  1,296,295.27 
6024+980.00  6.35  12.70  10.00  126.96  1,296,168.31 
6025+000.00  6.35  12.70  10.00  126.96  1,296,041.35 
6025+020.00  6.35  12.70  10.00  126.97  1,295,914.38 
6025+040.00  6.35  12.70  10.00  126.97  1,295,787.41 
6025+060.00  6.35  12.70  10.00  126.96  1,295,660.45 
6025+080.00  6.35  12.70  10.00  126.97  1,295,533.48 
6025+100.00  6.35  12.70  10.00  126.98  1,295,406.50 
6025+120.00  6.35  12.70  10.00  126.97  1,295,279.53 
6025+140.00  6.35  12.70  10.00  126.96  1,295,152.57 

421 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6025+160.00  6.35  12.70  10.00  126.97  1,295,025.60 


6025+180.00  6.35  12.70  10.00  126.97  1,294,898.63 
6025+200.00  6.35  12.70  10.00  126.97  1,294,771.66 
6025+220.00  6.35  12.70  10.00  126.97  1,294,644.69 
6025+240.00  6.35  12.70  10.00  126.96  1,294,517.73 
6025+260.00  6.35  12.70  10.00  126.96  1,294,390.77 
6025+280.00  6.35  12.70  10.00  126.96  1,294,263.81 
6025+300.00  6.35  12.70  10.00  126.96  1,294,136.85 
6025+320.00  6.35  12.70  10.00  126.96  1,294,009.89 
6025+340.00  6.35  12.70  10.00  126.96  1,293,882.93 
6025+360.00  6.35  12.70  10.00  126.96  1,293,755.97 
6025+380.00  6.35  12.70  10.00  126.96  1,293,629.01 
6025+400.00  6.35  12.70  10.00  126.96  1,293,502.05 
6025+420.00  6.35  12.70  10.00  126.96  1,293,375.09 
6025+440.00  6.35  12.70  10.00  126.96  1,293,248.13 
6025+460.00  6.35  12.70  10.00  126.96  1,293,121.17 
6025+480.00  6.35  12.70  10.00  126.96  1,292,994.21 
6025+500.00  6.35  12.70  10.00  126.96  1,292,867.25 
6025+520.00  6.35  12.70  10.00  126.96  1,292,740.29 
6025+540.00  6.35  12.70  10.00  126.96  1,292,613.33 
6025+560.00  6.35  12.70  10.00  126.96  1,292,486.37 
6025+580.00  6.35  12.70  10.00  126.96  1,292,359.41 
6025+580.00  6.35  12.70  0.00  0.00  1,292,359.41 
6025+600.00  6.35  12.70  10.00  126.96  1,292,232.45 
6025+620.00  6.35  12.70  10.00  126.96  1,292,105.49 
6025+640.00  6.35  12.70  10.00  126.96  1,291,978.53 
6025+660.00  6.35  12.70  10.00  126.96  1,291,851.57 
6025+660.00  6.35  12.70  0.00  0.00  1,291,851.57 
6025+680.00  6.35  12.70  10.00  126.96  1,291,724.61 
6025+700.00  6.35  12.70  10.00  126.96  1,291,597.65 
6025+720.00  6.35  12.70  10.00  126.96  1,291,470.69 
6025+740.00  6.35  12.70  10.00  126.96  1,291,343.73 
6025+760.00  6.35  12.70  10.00  126.96  1,291,216.77 
6025+780.00  6.35  12.70  10.00  126.96  1,291,089.81 
6025+800.00  6.35  12.70  10.00  126.96  1,290,962.85 
6025+820.00  6.35  12.70  10.00  126.96  1,290,835.89 
6025+840.00  6.35  12.70  10.00  126.96  1,290,708.93 
6025+860.00  6.35  12.70  10.00  126.96  1,290,581.97 
6025+880.00  6.35  12.70  10.00  126.96  1,290,455.01 
6025+900.00  6.35  12.70  10.00  126.96  1,290,328.05 
6025+920.00  6.35  12.70  10.00  126.96  1,290,201.09 
6025+940.00  6.35  12.70  10.00  126.96  1,290,074.13 
6025+960.00  6.35  12.70  10.00  126.96  1,289,947.17 
6025+980.00  6.35  12.70  10.00  126.96  1,289,820.21 
6026+000.00  6.35  12.70  10.00  126.96  1,289,693.25 

422 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6026+020.00  6.35  12.70  10.00  126.96  1,289,566.29 


6026+040.00  6.35  12.70  10.00  126.97  1,289,439.32 
6026+060.00  6.35  12.70  10.00  126.97  1,289,312.35 
6026+080.00  6.35  12.70  10.00  126.96  1,289,185.39 
6026+100.00  6.35  12.70  10.00  126.96  1,289,058.43 
6026+120.00  6.35  12.70  10.00  126.96  1,288,931.47 
6026+140.00  6.35  12.70  10.00  126.96  1,288,804.51 
6026+160.00  6.35  12.70  10.00  126.96  1,288,677.55 
6026+180.00  6.35  12.70  10.00  126.96  1,288,550.59 
6026+200.00  6.35  12.70  10.00  126.96  1,288,423.63 
6026+220.00  6.35  12.70  10.00  126.97  1,288,296.66 
6026+240.00  6.35  12.70  10.00  126.98  1,288,169.68 
6026+260.00  6.35  12.70  10.00  126.98  1,288,042.70 
6026+280.00  6.35  12.70  10.00  126.98  1,287,915.72 
6026+290.99  6.35  12.70  5.49  69.76  1,287,845.97 
6026+300.00  6.35  12.70  4.51  57.21  1,287,788.76 
6026+320.00  6.35  12.70  10.00  126.96  1,287,661.80 
6026+320.99  6.35  12.70  0.49  6.27  1,287,655.53 
6026+340.00  6.35  12.70  9.51  120.71  1,287,534.82 
6026+360.00  6.35  12.70  10.00  126.98  1,287,407.84 
6026+380.00  6.35  12.70  10.00  126.97  1,287,280.87 
6026+400.00  6.35  12.70  10.00  126.96  1,287,153.91 
6026+407.71  6.35  12.70  3.85  48.93  1,287,104.98 
6026+420.00  6.35  12.70  6.15  78.03  1,287,026.95 
6026+437.71  6.35  12.70  8.85  112.42  1,286,914.53 
6026+440.00  6.35  12.70  1.15  14.55  1,286,899.98 
6026+460.00  6.35  12.70  10.00  126.96  1,286,773.02 
6026+480.00  6.35  12.70  10.00  126.96  1,286,646.06 
6026+500.00  6.35  12.70  10.00  126.96  1,286,519.10 
6026+520.00  6.35  12.70  10.00  126.96  1,286,392.14 
6026+540.00  6.35  12.70  10.00  126.96  1,286,265.18 
6026+560.00  6.35  12.70  10.00  126.96  1,286,138.22 
6026+580.00  6.35  12.70  10.00  126.96  1,286,011.26 
6026+600.00  6.35  12.70  10.00  126.96  1,285,884.30 
6026+620.00  6.35  12.70  10.00  126.96  1,285,757.34 
6026+640.00  6.35  12.70  10.00  126.96  1,285,630.38 
6026+660.00  6.35  12.70  10.00  126.96  1,285,503.42 
6026+680.00  6.35  12.70  10.00  126.96  1,285,376.46 
6026+700.00  6.35  12.70  10.00  126.96  1,285,249.50 
6026+720.00  6.35  12.70  10.00  126.96  1,285,122.54 
6026+740.00  6.35  12.70  10.00  126.96  1,284,995.58 
6026+760.00  6.35  12.70  10.00  126.96  1,284,868.62 
6026+780.00  6.35  12.70  10.00  126.96  1,284,741.66 
6026+800.00  6.35  12.70  10.00  126.96  1,284,614.70 
6026+820.00  6.35  12.70  10.00  126.96  1,284,487.74 

423 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6026+840.00  6.35  12.70  10.00  126.96  1,284,360.78 


6026+860.00  6.35  12.70  10.00  126.96  1,284,233.82 
6026+880.00  6.35  12.70  10.00  126.96  1,284,106.86 
6026+900.00  6.35  12.70  10.00  126.96  1,283,979.90 
6026+920.00  6.35  12.70  10.00  126.96  1,283,852.94 
6026+940.00  6.35  12.70  10.00  126.96  1,283,725.98 
6026+960.00  6.35  12.70  10.00  126.96  1,283,599.02 
6026+980.00  6.35  12.70  10.00  126.96  1,283,472.06 
6027+000.00  6.35  12.70  10.00  126.96  1,283,345.10 
6027+020.00  6.35  12.70  10.00  126.96  1,283,218.14 
6027+040.00  6.35  12.70  10.00  126.96  1,283,091.18 
6027+060.00  6.35  12.70  10.00  126.96  1,282,964.22 
6027+080.00  6.35  12.70  10.00  126.96  1,282,837.26 
6027+100.00  6.35  12.70  10.00  126.96  1,282,710.30 
6027+120.00  6.35  12.70  10.00  126.96  1,282,583.34 
6027+140.00  6.35  12.70  10.00  126.96  1,282,456.38 
6027+160.00  6.35  12.70  10.00  126.96  1,282,329.42 
6027+180.00  6.35  12.70  10.00  126.96  1,282,202.46 
6027+200.00  6.35  12.70  10.00  126.96  1,282,075.50 
6027+220.00  6.35  12.70  10.00  126.96  1,281,948.54 
6027+240.00  6.35  12.70  10.00  126.96  1,281,821.58 
6027+260.00  6.35  12.70  10.00  126.96  1,281,694.62 
6027+280.00  6.35  12.70  10.00  126.96  1,281,567.66 
6027+300.00  6.35  12.70  10.00  126.96  1,281,440.70 
6027+320.00  6.35  12.70  10.00  126.96  1,281,313.74 
6027+340.00  6.35  12.70  10.00  126.96  1,281,186.78 
6027+360.00  6.35  12.70  10.00  126.96  1,281,059.82 
6027+380.00  6.35  12.70  10.00  126.96  1,280,932.86 
6027+400.00  6.35  12.70  10.00  126.96  1,280,805.90 
6027+420.00  6.35  12.70  10.00  126.96  1,280,678.94 
6027+440.00  6.35  12.70  10.00  126.96  1,280,551.98 
6027+460.00  6.35  12.70  10.00  126.96  1,280,425.02 
6027+480.00  6.35  12.70  10.00  126.96  1,280,298.06 
6027+500.00  6.35  12.70  10.00  126.96  1,280,171.10 
6027+520.00  6.35  12.70  10.00  126.96  1,280,044.14 
6027+540.00  6.35  12.70  10.00  126.97  1,279,917.17 
6027+560.00  6.35  12.70  10.00  126.97  1,279,790.20 
6027+565.00  6.35  12.70  2.50  31.74  1,279,758.46 
6027+565.00  6.35  12.70  0.00  0.00  1,279,758.46 
6027+580.00  6.35  12.70  7.50  95.23  1,279,663.23 
6027+600.00  6.35  12.70  10.00  126.98  1,279,536.25 
6027+620.00  6.35  12.70  10.00  126.97  1,279,409.28 
6027+640.00  6.35  12.70  10.00  126.97  1,279,282.31 
6027+660.00  6.35  12.70  10.00  126.98  1,279,155.33 
6027+680.00  6.35  12.70  10.00  126.98  1,279,028.35 

424 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6027+700.00  6.35  12.70  10.00  126.97  1,278,901.38 


6027+720.00  6.35  12.70  10.00  126.96  1,278,774.42 
6027+740.00  6.35  12.70  10.00  126.97  1,278,647.45 
6027+760.00  6.35  12.70  10.00  126.97  1,278,520.48 
6027+780.00  6.35  12.70  10.00  126.96  1,278,393.52 
6027+800.00  6.35  12.70  10.00  126.97  1,278,266.55 
6027+820.00  6.35  12.70  10.00  126.97  1,278,139.58 
6027+840.00  6.35  12.70  10.00  126.96  1,278,012.62 
6027+860.00  6.35  12.70  10.00  126.97  1,277,885.65 
6027+880.00  6.35  12.70  10.00  126.97  1,277,758.68 
6027+900.00  6.35  12.70  10.00  126.96  1,277,631.72 
6027+920.00  6.35  12.70  10.00  126.96  1,277,504.76 
6027+940.00  6.35  12.70  10.00  126.97  1,277,377.79 
6027+960.00  6.35  12.70  10.00  126.97  1,277,250.82 
6027+980.00  6.35  12.70  10.00  126.96  1,277,123.86 
6027+990.00  6.35  12.70  5.00  63.49  1,277,060.38 
6027+990.00  6.35  12.70  0.00  0.00  1,277,060.38 
6028+000.00  6.35  12.70  5.00  63.49  1,276,996.89 
6028+000.00  6.35  12.70  0.00  0.00  1,276,996.89 
6028+020.00  6.35  12.70  10.00  126.96  1,276,869.93 
6028+040.00  6.35  12.70  10.00  126.96  1,276,742.97 
6028+060.00  6.35  12.70  10.00  126.96  1,276,616.01 
6028+080.00  6.35  12.70  10.00  126.96  1,276,489.05 
6028+100.00  6.35  12.70  10.00  126.96  1,276,362.09 
6028+120.00  6.35  12.70  10.00  126.96  1,276,235.13 
6028+140.00  6.35  12.70  10.00  126.96  1,276,108.17 
6028+140.00  6.35  12.70  0.00  0.00  1,276,108.17 
6028+160.00  6.35  12.70  10.00  126.96  1,275,981.21 
6028+180.00  6.35  12.70  10.00  126.96  1,275,854.25 
6028+200.00  6.35  12.70  10.00  126.96  1,275,727.29 
6028+220.00  6.35  12.70  10.00  126.96  1,275,600.33 
6028+240.00  6.35  12.70  10.00  126.96  1,275,473.37 
6028+260.00  6.35  12.70  10.00  126.96  1,275,346.41 
6028+280.00  6.35  12.70  10.00  126.96  1,275,219.45 
6028+300.00  6.35  12.70  10.00  126.96  1,275,092.49 
6028+320.00  6.35  12.70  10.00  126.97  1,274,965.52 
6028+340.00  6.35  12.70  10.00  126.97  1,274,838.55 
6028+360.00  6.35  12.70  10.00  126.96  1,274,711.59 
6028+380.00  6.35  12.70  10.00  126.95  1,274,584.64 
6028+400.00  6.35  12.70  10.00  126.96  1,274,457.68 
6028+420.00  6.35  12.70  10.00  126.98  1,274,330.70 
6028+440.00  6.35  12.70  10.00  126.97  1,274,203.73 
6028+460.00  6.35  12.70  10.00  126.96  1,274,076.77 
6028+480.00  6.35  12.70  10.00  126.96  1,273,949.81 
6028+500.00  6.35  12.70  10.00  126.96  1,273,822.85 

425 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6028+520.00  6.35  12.70  10.00  126.97  1,273,695.88 


6028+540.00  6.35  12.70  10.00  126.97  1,273,568.91 
6028+560.00  6.35  12.70  10.00  126.96  1,273,441.95 
6028+580.00  6.35  12.70  10.00  126.96  1,273,314.99 
6028+600.00  6.35  12.70  10.00  126.97  1,273,188.02 
6028+620.00  6.35  12.70  10.00  126.97  1,273,061.05 
6028+640.00  6.35  12.70  10.00  126.96  1,272,934.09 
6028+660.00  6.35  12.70  10.00  126.96  1,272,807.13 
6028+680.00  6.35  12.70  10.00  126.97  1,272,680.16 
6028+700.00  6.35  12.70  10.00  126.97  1,272,553.19 
6028+720.00  6.35  12.70  10.00  126.96  1,272,426.23 
6028+740.00  6.35  12.70  10.00  126.96  1,272,299.27 
6028+760.00  6.35  12.70  10.00  126.96  1,272,172.31 
6028+780.00  6.35  12.70  10.00  126.97  1,272,045.34 
6028+800.00  6.35  12.70  10.00  126.97  1,271,918.37 
6028+820.00  6.35  12.70  10.00  126.97  1,271,791.40 
6028+840.00  6.35  12.70  10.00  126.97  1,271,664.43 
6028+860.00  6.35  12.70  10.00  126.97  1,271,537.46 
6028+880.00  6.35  12.70  10.00  126.97  1,271,410.49 
6028+900.00  6.35  12.70  10.00  126.97  1,271,283.52 
6028+920.00  6.35  12.70  10.00  126.97  1,271,156.55 
6028+940.00  6.35  12.70  10.00  126.97  1,271,029.58 
6028+960.00  6.35  12.70  10.00  126.97  1,270,902.61 
6028+980.00  6.35  12.70  10.00  126.97  1,270,775.64 
6029+000.00  6.35  12.70  10.00  126.97  1,270,648.67 
6029+020.00  6.35  12.70  10.00  126.97  1,270,521.70 
6029+040.00  6.35  12.70  10.00  126.97  1,270,394.73 
6029+060.00  6.35  12.70  10.00  126.97  1,270,267.76 
6029+080.00  6.35  12.70  10.00  126.97  1,270,140.79 
6029+100.00  6.35  12.70  10.00  126.97  1,270,013.82 
6029+120.00  6.35  12.70  10.00  126.97  1,269,886.85 
6029+140.00  6.35  12.70  10.00  126.97  1,269,759.88 
6029+160.00  6.35  12.70  10.00  126.97  1,269,632.91 
6029+180.00  6.35  12.70  10.00  126.97  1,269,505.94 
6029+200.00  6.35  12.70  10.00  126.97  1,269,378.97 
6029+220.00  6.35  12.70  10.00  126.97  1,269,252.00 
6029+240.00  6.35  12.70  10.00  126.97  1,269,125.03 
6029+255.00  6.35  12.70  7.50  95.22  1,269,029.81 
6029+255.00  6.35  12.70  0.00  0.00  1,269,029.81 
6029+260.00  6.35  12.70  2.50  31.74  1,268,998.07 
6029+280.00  6.35  12.70  10.00  126.97  1,268,871.10 
6029+300.00  6.35  12.70  10.00  126.97  1,268,744.13 
6029+320.00  6.35  12.70  10.00  126.97  1,268,617.16 
6029+340.00  6.35  12.70  10.00  126.97  1,268,490.19 
6029+340.00  6.35  12.70  0.00  0.00  1,268,490.19 

426 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6029+360.00  6.35  12.70  10.00  126.97  1,268,363.22 


6029+380.00  6.35  12.70  10.00  126.97  1,268,236.25 
6029+400.00  6.35  12.70  10.00  126.97  1,268,109.28 
6029+420.00  6.35  12.70  10.00  126.97  1,267,982.31 
6029+440.00  6.35  12.70  10.00  126.97  1,267,855.34 
6029+449.97  6.35  12.70  4.98  63.26  1,267,792.08 
6029+460.00  6.35  12.70  5.02  63.71  1,267,728.37 
6029+480.00  6.35  12.70  10.00  126.96  1,267,601.41 
6029+500.00  6.35  12.70  10.00  126.96  1,267,474.45 
6029+520.00  6.35  12.70  10.00  126.96  1,267,347.49 
6029+540.00  6.35  12.70  10.00  126.96  1,267,220.53 
6029+560.00  6.35  12.70  10.00  126.96  1,267,093.57 
6029+580.00  6.35  12.70  10.00  126.96  1,266,966.61 
6029+599.97  6.35  12.70  9.98  126.74  1,266,839.87 
6029+600.00  6.35  12.70  0.02  0.22  1,266,839.65 
6029+620.00  6.35  12.70  10.00  126.97  1,266,712.68 
6029+620.00  6.35  12.70  0.00  0.00  1,266,712.68 
6029+640.00  6.35  12.70  10.00  126.96  1,266,585.72 
6029+660.00  6.35  12.70  10.00  126.96  1,266,458.76 
6029+680.00  6.35  12.70  10.00  126.97  1,266,331.79 
6029+700.00  6.35  12.70  10.00  126.96  1,266,204.83 
6029+720.00  6.35  12.70  10.00  126.96  1,266,077.87 
6029+740.00  6.35  12.70  10.00  126.96  1,265,950.91 
6029+760.00  6.35  12.70  10.00  126.97  1,265,823.94 
6029+780.00  6.35  12.70  10.00  126.97  1,265,696.97 
6029+800.00  6.35  12.70  10.00  126.97  1,265,570.00 
6029+820.00  6.35  12.70  10.00  126.97  1,265,443.03 
6029+840.00  6.35  12.70  10.00  126.96  1,265,316.07 
6029+860.00  6.35  12.70  10.00  126.97  1,265,189.10 
6029+880.00  6.35  12.70  10.00  126.97  1,265,062.13 
6029+900.00  6.35  12.70  10.00  126.97  1,264,935.16 
6029+920.00  6.35  12.70  10.00  126.97  1,264,808.19 
6029+940.00  6.35  12.70  10.00  126.97  1,264,681.22 
6029+960.00  6.35  12.70  10.00  126.97  1,264,554.25 
6029+980.00  6.35  12.70  10.00  126.96  1,264,427.29 
6030+000.00  6.35  12.70  10.00  126.97  1,264,300.32 
 

TABLA 35  CÁLCULO DE ACARREOS DE SUBRASANTE DEL TRAMO 6036+800– 6067+000 

Areas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subrasante     distancia  Subrasante  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

427 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6036+800.00  6.35  6.35        1,300,000.00 


6036+820.00  6.35  12.70  10.00  126.96  1,299,873.04 
6036+840.00  6.35  12.70  10.00  126.96  1,299,746.08 
6036+860.00  6.35  12.70  10.00  126.96  1,299,619.12 
6036+880.00  6.35  12.70  10.00  126.96  1,299,492.16 
6036+900.00  6.35  12.70  10.00  126.96  1,299,365.20 
6036+920.00  6.35  12.70  10.00  126.96  1,299,238.24 
6036+940.00  6.35  12.70  10.00  126.96  1,299,111.28 
6036+960.00  6.35  12.70  10.00  126.96  1,298,984.32 
6036+980.00  6.35  12.70  10.00  126.96  1,298,857.36 
6036+992.12  6.35  12.70  6.06  76.93  1,298,780.43 
6037+000.00  6.35  12.70  3.94  50.03  1,298,730.40 
6037+020.00  6.35  12.70  10.00  126.96  1,298,603.44 
6037+040.00  6.35  12.70  10.00  126.96  1,298,476.48 
6037+060.00  6.35  12.70  10.00  126.96  1,298,349.52 
6037+080.00  6.35  12.70  10.00  126.97  1,298,222.55 
6037+100.00  6.35  12.70  10.00  126.97  1,298,095.58 
6037+120.00  6.35  12.70  10.00  126.96  1,297,968.62 
6037+140.00  6.35  12.70  10.00  126.97  1,297,841.65 
6037+142.12  6.35  12.70  1.06  13.45  1,297,828.20 
6037+160.00  6.35  12.70  8.94  113.53  1,297,714.67 
6037+180.00  6.35  12.70  10.00  126.98  1,297,587.69 
6037+200.00  6.35  12.70  10.00  126.98  1,297,460.71 
6037+220.00  6.35  12.70  10.00  126.98  1,297,333.73 
6037+240.00  6.35  12.70  10.00  126.98  1,297,206.75 
6037+260.00  6.35  12.70  10.00  126.98  1,297,079.77 
6037+280.00  6.35  12.70  10.00  126.98  1,296,952.79 
6037+300.00  6.35  12.70  10.00  126.98  1,296,825.81 
6037+316.55  6.35  12.70  8.28  105.10  1,296,720.71 
6037+320.00  6.35  12.70  1.72  21.88  1,296,698.83 
6037+340.00  6.35  12.70  10.00  126.96  1,296,571.87 
6037+360.00  6.35  12.70  10.00  126.97  1,296,444.90 
6037+380.00  6.35  12.70  10.00  126.97  1,296,317.93 
6037+400.00  6.35  12.70  10.00  126.96  1,296,190.97 
6037+420.00  6.35  12.70  10.00  126.97  1,296,064.00 
6037+440.00  6.35  12.70  10.00  126.97  1,295,937.03 
6037+460.00  6.35  12.70  10.00  126.96  1,295,810.07 
6037+466.55  6.35  12.70  3.28  41.60  1,295,768.47 
6037+480.00  6.35  12.70  6.72  85.36  1,295,683.11 
6037+500.00  6.35  12.70  10.00  126.96  1,295,556.15 
6037+520.00  6.35  12.70  10.00  126.96  1,295,429.19 
6037+540.00  6.35  12.70  10.00  126.96  1,295,302.23 
6037+560.00  6.35  12.70  10.00  126.96  1,295,175.27 
6037+580.00  6.35  12.70  10.00  126.96  1,295,048.31 
6037+600.00  6.35  12.70  10.00  126.96  1,294,921.35 
6037+620.00  6.35  12.70  10.00  126.96  1,294,794.39 
6037+640.00  6.35  12.70  10.00  126.96  1,294,667.43 
6037+660.00  6.35  12.70  10.00  126.96  1,294,540.47 
6037+680.00  6.35  12.70  10.00  126.96  1,294,413.51 
6037+700.00  6.35  12.70  10.00  126.96  1,294,286.55 

428 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6037+720.00  6.35  12.70  10.00  126.96  1,294,159.59 


6037+740.00  6.35  12.70  10.00  126.96  1,294,032.63 
6037+760.00  6.35  12.70  10.00  126.96  1,293,905.67 
6037+780.00  6.35  12.70  10.00  126.96  1,293,778.71 
6037+800.00  6.35  12.70  10.00  126.96  1,293,651.75 
6037+820.00  6.35  12.70  10.00  126.96  1,293,524.79 
6037+840.00  6.35  12.70  10.00  126.96  1,293,397.83 
6037+860.00  6.35  12.70  10.00  126.96  1,293,270.87 
6037+880.00  6.35  12.70  10.00  126.96  1,293,143.91 
6037+900.00  6.35  12.70  10.00  126.96  1,293,016.95 
6037+920.00  6.35  12.70  10.00  126.96  1,292,889.99 
6037+940.00  6.35  12.70  10.00  126.96  1,292,763.03 
6037+960.00  6.35  12.70  10.00  126.96  1,292,636.07 
6037+980.00  6.35  12.70  10.00  126.96  1,292,509.11 
6038+000.00  6.35  12.70  10.00  126.96  1,292,382.15 
6038+020.00  6.35  12.70  10.00  126.96  1,292,255.19 
6038+040.00  6.35  12.70  10.00  126.96  1,292,128.23 
6038+060.00  6.35  12.70  10.00  126.96  1,292,001.27 
6038+080.00  6.35  12.70  10.00  126.96  1,291,874.31 
6038+100.00  6.35  12.70  10.00  126.96  1,291,747.35 
6038+120.00  6.35  12.70  10.00  126.96  1,291,620.39 
6038+140.00  6.35  12.70  10.00  126.96  1,291,493.43 
6038+160.00  6.35  12.70  10.00  126.96  1,291,366.47 
6038+180.00  6.35  12.70  10.00  126.96  1,291,239.51 
6038+200.00  6.35  12.70  10.00  126.96  1,291,112.55 
6038+220.00  6.35  12.70  10.00  126.96  1,290,985.59 
6038+240.00  6.35  12.70  10.00  126.96  1,290,858.63 
6038+260.00  6.35  12.70  10.00  126.96  1,290,731.67 
6038+280.00  6.35  12.70  10.00  126.96  1,290,604.71 
6038+300.00  6.35  12.70  10.00  126.96  1,290,477.75 
6038+320.00  6.35  12.70  10.00  126.96  1,290,350.79 
6038+340.00  6.35  12.70  10.00  126.96  1,290,223.83 
6038+360.00  6.35  12.70  10.00  126.96  1,290,096.87 
6038+380.00  6.35  12.70  10.00  126.96  1,289,969.91 
6038+400.00  6.35  12.70  10.00  126.96  1,289,842.95 
6038+420.00  6.35  12.70  10.00  126.96  1,289,715.99 
6038+440.00  6.35  12.70  10.00  126.96  1,289,589.03 
6038+460.00  6.35  12.70  10.00  126.96  1,289,462.07 
6038+480.00  6.35  12.70  10.00  126.96  1,289,335.11 
6038+500.00  6.35  12.70  10.00  126.96  1,289,208.15 
6038+520.00  6.35  12.70  10.00  126.96  1,289,081.19 
6038+540.00  6.35  12.70  10.00  126.96  1,288,954.23 
6038+560.00  6.35  12.70  10.00  126.96  1,288,827.27 
6038+580.00  6.35  12.70  10.00  126.96  1,288,700.31 
6038+600.00  6.35  12.70  10.00  126.96  1,288,573.35 
6038+620.00  6.35  12.70  10.00  126.96  1,288,446.39 
6038+640.00  6.35  12.70  10.00  126.96  1,288,319.43 
6038+660.00  6.35  12.70  10.00  126.96  1,288,192.47 
6038+680.00  6.35  12.70  10.00  126.96  1,288,065.51 
6038+700.00  6.35  12.70  10.00  126.96  1,287,938.55 
6038+720.00  6.35  12.70  10.00  126.96  1,287,811.59 

429 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6038+740.00  6.35  12.70  10.00  126.96  1,287,684.63 


6038+760.00  6.35  12.70  10.00  126.96  1,287,557.67 
6038+780.00  6.35  12.70  10.00  126.96  1,287,430.71 
6038+800.00  6.35  12.70  10.00  126.96  1,287,303.75 
6038+820.00  6.35  12.70  10.00  126.96  1,287,176.79 
6038+840.00  6.35  12.70  10.00  126.96  1,287,049.83 
6038+860.00  6.35  12.70  10.00  126.96  1,286,922.87 
6038+880.00  6.35  12.70  10.00  126.96  1,286,795.91 
6038+900.00  6.35  12.70  10.00  126.96  1,286,668.95 
6038+920.00  6.35  12.70  10.00  126.96  1,286,541.99 
6038+940.00  6.35  12.70  10.00  126.96  1,286,415.03 
6038+960.00  6.35  12.70  10.00  126.96  1,286,288.07 
6038+980.00  6.35  12.70  10.00  126.96  1,286,161.11 
6039+000.00  6.35  12.70  10.00  126.96  1,286,034.15 
6039+020.00  6.35  12.70  10.00  126.96  1,285,907.19 
6039+040.00  6.35  12.70  10.00  126.96  1,285,780.23 
6039+060.00  6.35  12.70  10.00  126.96  1,285,653.27 
6039+080.00  6.35  12.70  10.00  126.96  1,285,526.31 
6039+100.00  6.35  12.70  10.00  126.96  1,285,399.35 
6039+120.00  6.35  12.70  10.00  126.96  1,285,272.39 
6039+140.00  6.35  12.70  10.00  126.96  1,285,145.43 
6039+160.00  6.35  12.70  10.00  126.96  1,285,018.47 
6039+180.00  6.35  12.70  10.00  126.96  1,284,891.51 
6039+200.00  6.35  12.70  10.00  126.96  1,284,764.55 
6039+220.00  6.35  12.70  10.00  126.96  1,284,637.59 
6039+240.00  6.35  12.70  10.00  126.96  1,284,510.63 
6039+260.00  6.35  12.70  10.00  126.96  1,284,383.67 
6039+280.00  6.35  12.70  10.00  126.96  1,284,256.71 
6039+300.00  6.35  12.70  10.00  126.96  1,284,129.75 
6039+320.00  6.35  12.70  10.00  126.97  1,284,002.78 
6039+340.00  6.35  12.70  10.00  126.97  1,283,875.81 
6039+360.00  6.35  12.70  10.00  126.96  1,283,748.85 
6039+380.00  6.35  12.70  10.00  126.96  1,283,621.89 
6039+400.00  6.35  12.70  10.00  126.96  1,283,494.93 
6039+420.00  6.35  12.70  10.00  126.96  1,283,367.97 
6039+440.00  6.35  12.70  10.00  126.96  1,283,241.01 
6039+460.00  6.35  12.70  10.00  126.96  1,283,114.05 
6039+480.00  6.35  12.70  10.00  126.96  1,282,987.09 
6039+500.00  6.35  12.70  10.00  126.97  1,282,860.12 
6039+520.00  6.35  12.70  10.00  126.97  1,282,733.15 
6039+540.00  6.35  12.70  10.00  126.96  1,282,606.19 
6039+560.00  6.35  12.70  10.00  126.96  1,282,479.23 
6039+580.00  6.35  12.70  10.00  126.96  1,282,352.27 
6039+600.00  6.35  12.70  10.00  126.96  1,282,225.31 
6039+620.00  6.35  12.70  10.00  126.96  1,282,098.35 
6039+640.00  6.35  12.70  10.00  126.96  1,281,971.39 
6039+660.00  6.35  12.70  10.00  126.96  1,281,844.43 
6039+680.00  6.35  12.70  10.00  126.96  1,281,717.47 
6039+700.00  6.35  12.70  10.00  126.96  1,281,590.51 
6039+720.00  6.35  12.70  10.00  126.96  1,281,463.55 
6039+722.65  6.35  12.70  1.33  16.85  1,281,446.70 

430 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6039+730.00  6.35  12.69  3.67  46.63  1,281,400.08 


6039+740.00  6.34  12.69  5.00  63.43  1,281,336.65 
6039+742.65  6.34  12.68  1.33  16.83  1,281,319.83 
6039+750.00  6.35  12.69  3.67  46.61  1,281,273.22 
6039+760.00  6.39  12.74  5.00  63.69  1,281,209.53 
6039+770.00  6.46  12.85  5.00  64.26  1,281,145.27 
6039+780.00  6.57  13.03  5.00  65.17  1,281,080.10 
6039+790.00  6.71  13.28  5.00  66.42  1,281,013.69 
6039+800.00  6.89  13.60  5.00  68.00  1,280,945.69 
6039+810.00  7.09  13.97  5.00  69.87  1,280,875.83 
6039+820.00  7.29  14.37  5.00  71.86  1,280,803.97 
6039+830.00  7.49  14.77  5.00  73.86  1,280,730.11 
6039+840.00  7.69  15.17  5.00  75.86  1,280,654.26 
6039+850.00  7.88  15.56  5.00  77.82  1,280,576.44 
6039+860.00  8.04  15.91  5.00  79.57  1,280,496.88 
6039+870.00  8.16  16.20  5.00  80.99  1,280,415.89 
6039+880.00  8.25  16.42  5.00  82.08  1,280,333.82 
6039+890.00  8.31  16.57  5.00  82.83  1,280,250.99 
6039+900.00  8.34  16.65  5.00  83.24  1,280,167.75 
6039+910.00  8.34  16.68  5.00  83.38  1,280,084.38 
6039+920.00  8.34  16.68  5.00  83.39  1,280,000.99 
6039+940.00  8.34  16.68  10.00  166.78  1,279,834.21 
6039+960.00  8.34  16.68  10.00  166.78  1,279,667.43 
6039+980.00  8.34  16.68  10.00  166.78  1,279,500.65 
6040+000.00  8.34  16.68  10.00  166.78  1,279,333.87 
6040+020.00  8.34  16.68  10.00  166.77  1,279,167.10 
6040+040.00  8.34  16.68  10.00  166.77  1,279,000.33 
6040+060.00  8.34  16.68  10.00  166.78  1,278,833.55 
6040+080.00  8.34  16.68  10.00  166.78  1,278,666.77 
6040+100.00  8.34  16.68  10.00  166.78  1,278,499.99 
6040+120.00  8.34  16.68  10.00  166.78  1,278,333.21 
6040+140.00  8.34  16.68  10.00  166.78  1,278,166.43 
6040+160.00  8.34  16.68  10.00  166.78  1,277,999.65 
6040+180.00  8.34  16.68  10.00  166.78  1,277,832.87 
6040+200.00  8.34  16.68  10.00  166.78  1,277,666.09 
6040+220.00  8.34  16.68  10.00  166.78  1,277,499.31 
6040+240.00  8.34  16.68  10.00  166.78  1,277,332.53 
6040+260.00  8.34  16.68  10.00  166.78  1,277,165.75 
6040+280.00  8.34  16.68  10.00  166.78  1,276,998.97 
6040+300.00  8.34  16.68  10.00  166.78  1,276,832.19 
6040+320.00  8.34  16.68  10.00  166.78  1,276,665.41 
6040+333.37  8.34  16.68  6.69  111.49  1,276,553.92 
6040+340.00  8.34  16.68  3.31  55.29  1,276,498.63 
6040+360.00  8.34  16.68  10.00  166.77  1,276,331.86 
6040+380.00  8.34  16.68  10.00  166.77  1,276,165.09 
6040+400.00  8.34  16.68  10.00  166.77  1,275,998.32 
6040+420.00  8.34  16.68  10.00  166.77  1,275,831.55 
6040+440.00  8.34  16.68  10.00  166.77  1,275,664.78 
6040+460.00  8.34  16.68  10.00  166.77  1,275,498.01 
6040+480.00  8.34  16.68  10.00  166.78  1,275,331.23 
6040+483.37  8.34  16.68  1.69  28.11  1,275,303.12 

431 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6040+500.00  8.34  16.68  8.31  138.65  1,275,164.47 


6040+520.00  8.34  16.68  10.00  166.76  1,274,997.71 
6040+540.00  8.34  16.68  10.00  166.76  1,274,830.95 
6040+560.00  8.34  16.68  10.00  166.76  1,274,664.19 
6040+580.00  8.34  16.68  10.00  166.76  1,274,497.43 
6040+600.00  8.34  16.68  10.00  166.76  1,274,330.67 
6040+620.00  8.34  16.68  10.00  166.76  1,274,163.91 
6040+640.00  8.34  16.68  10.00  166.76  1,273,997.15 
6040+660.00  8.34  16.68  10.00  166.76  1,273,830.39 
6040+680.00  8.34  16.68  10.00  166.76  1,273,663.63 
6040+700.00  8.34  16.68  10.00  166.76  1,273,496.87 
6040+720.00  8.34  16.68  10.00  166.76  1,273,330.11 
6040+740.00  8.34  16.68  10.00  166.76  1,273,163.35 
6040+760.00  8.34  16.68  10.00  166.76  1,272,996.59 
6040+780.00  8.34  16.68  10.00  166.76  1,272,829.83 
6040+781.48  8.34  16.68  0.74  12.34  1,272,817.49 
6040+800.00  8.34  16.68  9.26  154.43  1,272,663.06 
6040+820.00  8.34  16.68  10.00  166.77  1,272,496.29 
6040+840.00  8.34  16.68  10.00  166.77  1,272,329.52 
6040+860.00  8.34  16.68  10.00  166.77  1,272,162.75 
6040+880.00  8.34  16.68  10.00  166.77  1,271,995.98 
6040+900.00  8.34  16.68  10.00  166.77  1,271,829.21 
6040+920.00  8.34  16.68  10.00  166.76  1,271,662.45 
6040+931.48  8.34  16.68  5.74  95.73  1,271,566.73 
6040+940.00  8.34  16.68  4.26  71.05  1,271,495.68 
6040+960.00  8.34  16.68  10.00  166.78  1,271,328.90 
6040+980.00  8.34  16.68  10.00  166.78  1,271,162.12 
6041+000.00  8.34  16.68  10.00  166.78  1,270,995.34 
6041+020.00  8.34  16.68  10.00  166.78  1,270,828.56 
6041+040.00  8.34  16.68  10.00  166.78  1,270,661.78 
6041+060.00  8.34  16.68  10.00  166.78  1,270,495.00 
6041+080.00  8.34  16.68  10.00  166.78  1,270,328.22 
6041+100.00  8.34  16.68  10.00  166.78  1,270,161.44 
6041+120.00  8.34  16.68  10.00  166.78  1,269,994.66 
6041+140.00  8.34  16.68  10.00  166.78  1,269,827.88 
6041+160.00  8.34  16.68  10.00  166.78  1,269,661.10 
6041+180.00  8.34  16.68  10.00  166.78  1,269,494.32 
6041+200.00  8.34  16.68  10.00  166.78  1,269,327.54 
6041+220.00  8.34  16.68  10.00  166.78  1,269,160.76 
6041+240.00  8.34  16.68  10.00  166.78  1,268,993.98 
6041+260.00  8.34  16.68  10.00  166.78  1,268,827.20 
6041+280.00  8.34  16.68  10.00  166.78  1,268,660.42 
6041+300.00  8.34  16.68  10.00  166.78  1,268,493.64 
6041+320.00  8.34  16.68  10.00  166.78  1,268,326.86 
6041+340.00  8.34  16.68  10.00  166.78  1,268,160.08 
6041+360.00  8.34  16.68  10.00  166.78  1,267,993.30 
6041+380.00  8.34  16.68  10.00  166.78  1,267,826.52 
6041+390.00  8.34  16.68  5.00  83.39  1,267,743.13 
6041+400.00  8.34  16.68  5.00  83.39  1,267,659.74 
6041+410.00  8.33  16.67  5.00  83.37  1,267,576.37 
6041+420.00  8.30  16.63  5.00  83.17  1,267,493.21 

432 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6041+430.00  8.23  16.53  5.00  82.65  1,267,410.56 


6041+440.00  8.13  16.36  5.00  81.81  1,267,328.75 
6041+450.00  8.00  16.13  5.00  80.63  1,267,248.13 
6041+460.00  7.83  15.82  5.00  79.11  1,267,169.02 
6041+470.00  7.63  15.46  5.00  77.28  1,267,091.74 
6041+480.00  7.43  15.06  5.00  75.30  1,267,016.44 
6041+490.00  7.23  14.66  5.00  73.30  1,266,943.14 
6041+500.00  7.03  14.26  5.00  71.30  1,266,871.84 
6041+510.00  6.84  13.87  5.00  69.33  1,266,802.52 
6041+520.00  6.67  13.51  5.00  67.53  1,266,734.99 
6041+530.00  6.54  13.21  5.00  66.04  1,266,668.95 
6041+540.00  6.44  12.98  5.00  64.89  1,266,604.06 
6041+550.00  6.37  12.81  5.00  64.07  1,266,539.99 
6041+560.00  6.34  12.72  5.00  63.58  1,266,476.41 
6041+564.54  6.34  12.68  2.27  28.82  1,266,447.60 
6041+570.00  6.34  12.68  2.73  34.60  1,266,413.00 
6041+580.00  6.35  12.69  5.00  63.44  1,266,349.57 
6041+584.54  6.35  12.69  2.27  28.84  1,266,320.73 
6041+600.00  6.35  12.70  7.73  98.11  1,266,222.61 
6041+620.00  6.35  12.70  10.00  126.96  1,266,095.65 
6041+640.00  6.35  12.70  10.00  126.96  1,265,968.69 
6041+660.00  6.35  12.70  10.00  126.96  1,265,841.73 
6041+680.00  6.35  12.70  10.00  126.96  1,265,714.77 
6041+700.00  6.35  12.70  10.00  126.96  1,265,587.81 
6041+720.00  6.35  12.70  10.00  126.96  1,265,460.85 
6041+740.00  6.35  12.70  10.00  126.96  1,265,333.89 
6041+760.00  6.35  12.70  10.00  126.96  1,265,206.93 
6041+780.00  6.35  12.70  10.00  126.96  1,265,079.97 
6041+800.00  6.35  12.70  10.00  126.96  1,264,953.01 
6041+820.00  6.35  12.70  10.00  126.96  1,264,826.05 
6041+840.00  6.35  12.70  10.00  126.96  1,264,699.09 
6041+860.00  6.35  12.70  10.00  126.96  1,264,572.13 
6041+880.00  6.35  12.70  10.00  126.96  1,264,445.17 
6041+900.00  6.35  12.70  10.00  126.96  1,264,318.21 
6041+920.00  6.35  12.70  10.00  126.96  1,264,191.25 
6041+940.00  6.35  12.70  10.00  126.96  1,264,064.29 
6041+960.00  6.35  12.70  10.00  126.96  1,263,937.33 
6041+980.00  6.35  12.70  10.00  126.96  1,263,810.37 
6042+000.00  6.35  12.70  10.00  126.96  1,263,683.41 
6042+020.00  6.35  12.70  10.00  126.96  1,263,556.45 
6042+040.00  6.35  12.70  10.00  126.96  1,263,429.49 
6042+060.00  6.35  12.70  10.00  126.97  1,263,302.52 
6042+080.00  6.35  12.70  10.00  126.98  1,263,175.54 
6042+100.00  6.35  12.70  10.00  126.97  1,263,048.57 
6042+120.00  6.35  12.70  10.00  126.97  1,262,921.60 
6042+140.00  6.35  12.70  10.00  126.97  1,262,794.63 
6042+160.00  6.35  12.70  10.00  126.96  1,262,667.67 
6042+180.00  6.35  12.70  10.00  126.97  1,262,540.70 
6042+200.00  6.35  12.70  10.00  126.97  1,262,413.73 
6042+220.00  6.35  12.70  10.00  126.96  1,262,286.77 
6042+240.00  6.35  12.70  10.00  126.96  1,262,159.81 

433 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6042+260.00  6.35  12.70  10.00  126.97  1,262,032.84 


6042+280.00  6.35  12.70  10.00  126.97  1,261,905.87 
6042+300.00  6.35  12.70  10.00  126.96  1,261,778.91 
6042+320.00  6.35  12.70  10.00  126.96  1,261,651.95 
6042+340.00  6.35  12.70  10.00  126.96  1,261,524.99 
6042+360.00  6.35  12.70  10.00  126.96  1,261,398.03 
6042+380.00  6.35  12.70  10.00  126.96  1,261,271.07 
6042+400.00  6.35  12.70  10.00  126.96  1,261,144.11 
6042+420.00  6.35  12.70  10.00  126.96  1,261,017.15 
6042+440.00  6.35  12.70  10.00  126.97  1,260,890.18 
6042+460.00  6.35  12.70  10.00  126.98  1,260,763.20 
6042+480.00  6.35  12.70  10.00  126.97  1,260,636.23 
6042+500.00  6.35  12.70  10.00  126.96  1,260,509.27 
6042+520.00  6.35  12.70  10.00  126.96  1,260,382.31 
6042+540.00  6.35  12.70  10.00  126.96  1,260,255.35 
6042+560.00  6.35  12.70  10.00  126.96  1,260,128.39 
6042+580.00  6.35  12.70  10.00  126.96  1,260,001.43 
6042+600.00  6.35  12.70  10.00  126.96  1,259,874.47 
6042+620.00  6.35  12.70  10.00  126.96  1,259,747.51 
6042+640.00  6.35  12.70  10.00  126.96  1,259,620.55 
6042+660.00  6.35  12.70  10.00  126.96  1,259,493.59 
6042+680.00  6.35  12.70  10.00  126.96  1,259,366.63 
6042+700.00  6.35  12.70  10.00  126.96  1,259,239.67 
6042+720.00  6.35  12.70  10.00  126.97  1,259,112.70 
6042+740.00  6.35  12.70  10.00  126.97  1,258,985.73 
6042+760.00  6.35  12.70  10.00  126.96  1,258,858.77 
6042+780.00  6.35  12.70  10.00  126.97  1,258,731.80 
6042+800.00  6.35  12.70  10.00  126.98  1,258,604.82 
6042+820.00  6.35  12.70  10.00  126.98  1,258,477.84 
6042+840.00  6.35  12.70  10.00  126.97  1,258,350.87 
6042+860.00  6.35  12.70  10.00  126.96  1,258,223.91 
6042+880.00  6.35  12.70  10.00  126.97  1,258,096.94 
6042+900.00  6.35  12.70  10.00  126.97  1,257,969.97 
6042+920.00  6.35  12.70  10.00  126.96  1,257,843.01 
6042+940.00  6.35  12.70  10.00  126.97  1,257,716.04 
6042+960.00  6.35  12.70  10.00  126.98  1,257,589.06 
6042+980.00  6.35  12.70  10.00  126.97  1,257,462.09 
6043+000.00  6.35  12.70  10.00  126.96  1,257,335.13 
6043+020.00  6.35  12.70  10.00  126.96  1,257,208.17 
6043+040.00  6.35  12.70  10.00  126.97  1,257,081.20 
6043+060.00  6.35  12.70  10.00  126.97  1,256,954.23 
6043+080.00  6.35  12.70  10.00  126.96  1,256,827.27 
6043+100.00  6.35  12.70  10.00  126.96  1,256,700.31 
6043+120.00  6.35  12.70  10.00  126.97  1,256,573.34 
6043+140.00  6.35  12.70  10.00  126.98  1,256,446.36 
6043+160.00  6.35  12.70  10.00  126.97  1,256,319.39 
6043+180.00  6.35  12.70  10.00  126.96  1,256,192.43 
6043+200.00  6.35  12.70  10.00  126.96  1,256,065.47 
6043+220.00  6.35  12.70  10.00  126.96  1,255,938.51 
6043+240.00  6.35  12.70  10.00  126.96  1,255,811.55 
6043+260.00  6.35  12.70  10.00  126.96  1,255,684.59 

434 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6043+280.00  6.35  12.70  10.00  126.96  1,255,557.63 


6043+300.00  6.35  12.70  10.00  126.96  1,255,430.67 
6043+320.00  6.35  12.70  10.00  126.96  1,255,303.71 
6043+340.00  6.35  12.70  10.00  126.96  1,255,176.75 
6043+360.00  6.35  12.70  10.00  126.96  1,255,049.79 
6043+380.00  6.35  12.70  10.00  126.96  1,254,922.83 
6043+400.00  6.35  12.70  10.00  126.96  1,254,795.87 
6043+420.00  6.35  12.70  10.00  126.96  1,254,668.91 
6043+440.00  6.35  12.70  10.00  126.96  1,254,541.95 
6043+460.00  6.35  12.70  10.00  126.96  1,254,414.99 
6043+480.00  6.35  12.70  10.00  126.96  1,254,288.03 
6043+500.00  6.35  12.70  10.00  126.96  1,254,161.07 
6043+520.00  6.35  12.70  10.00  126.96  1,254,034.11 
6043+540.00  6.35  12.70  10.00  126.96  1,253,907.15 
6043+560.00  6.35  12.70  10.00  126.96  1,253,780.19 
6043+580.00  6.35  12.70  10.00  126.96  1,253,653.23 
6043+600.00  6.35  12.70  10.00  126.96  1,253,526.27 
6043+620.00  6.35  12.70  10.00  126.96  1,253,399.31 
6043+640.00  6.35  12.70  10.00  126.96  1,253,272.35 
6043+660.00  6.35  12.70  10.00  126.96  1,253,145.39 
6043+680.00  6.35  12.70  10.00  126.96  1,253,018.43 
6043+700.00  6.35  12.70  10.00  126.96  1,252,891.47 
6043+720.00  6.35  12.70  10.00  126.96  1,252,764.51 
6043+740.00  6.35  12.70  10.00  126.96  1,252,637.55 
6043+760.00  6.35  12.70  10.00  126.96  1,252,510.59 
6043+780.00  6.35  12.70  10.00  126.96  1,252,383.63 
6043+800.00  6.35  12.70  10.00  126.96  1,252,256.67 
6043+820.00  6.35  12.70  10.00  126.96  1,252,129.71 
6043+840.00  6.35  12.70  10.00  126.96  1,252,002.75 
6043+860.00  6.35  12.70  10.00  126.96  1,251,875.79 
6043+880.00  6.35  12.70  10.00  126.96  1,251,748.83 
6043+900.00  6.35  12.70  10.00  126.96  1,251,621.87 
6043+920.00  6.35  12.70  10.00  126.96  1,251,494.91 
6043+940.00  6.35  12.70  10.00  126.96  1,251,367.95 
6043+960.00  6.35  12.70  10.00  126.96  1,251,240.99 
6043+980.00  6.35  12.70  10.00  126.96  1,251,114.03 
6044+000.00  6.35  12.70  10.00  126.97  1,250,987.06 
6044+020.00  6.35  12.70  10.00  126.97  1,250,860.09 
6044+040.00  6.35  12.70  10.00  126.97  1,250,733.12 
6044+060.00  6.35  12.70  10.00  126.98  1,250,606.14 
6044+080.00  6.35  12.70  10.00  126.97  1,250,479.17 
6044+100.00  6.35  12.70  10.00  126.96  1,250,352.21 
6044+120.00  6.35  12.70  10.00  126.96  1,250,225.25 
6044+140.00  6.35  12.70  10.00  126.96  1,250,098.29 
6044+160.00  6.35  12.70  10.00  126.96  1,249,971.33 
6044+180.00  6.35  12.70  10.00  126.97  1,249,844.36 
6044+185.00  6.35  12.70  2.50  31.75  1,249,812.62 
6044+185.00  6.35  12.70  0.00  0.00  1,249,812.62 
6044+200.00  6.35  12.70  7.50  95.24  1,249,717.38 
6044+220.00  6.35  12.70  10.00  126.98  1,249,590.40 
6044+240.00  6.35  12.70  10.00  126.98  1,249,463.42 

435 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6044+260.00  6.35  12.70  10.00  126.97  1,249,336.45 


6044+280.00  6.35  12.70  10.00  126.96  1,249,209.49 
6044+300.00  6.35  12.70  10.00  126.96  1,249,082.53 
6044+320.00  6.35  12.70  10.00  126.96  1,248,955.57 
6044+320.00  6.35  12.70  0.00  0.00  1,248,955.57 
6044+340.00  6.35  12.70  10.00  126.97  1,248,828.60 
6044+360.00  6.35  12.70  10.00  126.97  1,248,701.63 
6044+370.00  6.35  12.70  5.00  63.48  1,248,638.15 
6044+380.00  6.35  12.70  5.00  63.49  1,248,574.67 
6044+400.00  6.35  12.70  10.00  126.97  1,248,447.70 
6044+420.00  6.35  12.70  10.00  126.97  1,248,320.73 
6044+440.00  6.35  12.70  10.00  126.97  1,248,193.76 
6044+460.00  6.35  12.70  10.00  126.96  1,248,066.80 
6044+480.00  6.35  12.70  10.00  126.96  1,247,939.84 
6044+500.00  6.35  12.70  10.00  126.96  1,247,812.88 
6044+520.00  6.35  12.70  10.00  126.96  1,247,685.92 
6044+540.00  6.35  12.70  10.00  126.96  1,247,558.96 
6044+560.00  6.35  12.70  10.00  126.96  1,247,432.00 
6044+580.00  6.35  12.70  10.00  126.96  1,247,305.04 
6044+600.00  6.35  12.70  10.00  126.96  1,247,178.08 
6044+620.00  6.35  12.70  10.00  126.96  1,247,051.12 
6044+640.00  6.35  12.70  10.00  126.96  1,246,924.16 
6044+660.00  6.35  12.70  10.00  126.96  1,246,797.20 
6044+680.00  6.35  12.70  10.00  126.96  1,246,670.24 
6044+700.00  6.35  12.70  10.00  126.96  1,246,543.28 
6044+720.00  6.35  12.70  10.00  126.96  1,246,416.32 
6044+740.00  6.35  12.70  10.00  126.96  1,246,289.36 
6044+760.00  6.35  12.70  10.00  126.96  1,246,162.40 
6044+780.00  6.35  12.70  10.00  126.96  1,246,035.44 
6044+800.00  6.35  12.70  10.00  126.96  1,245,908.48 
6044+820.00  6.35  12.70  10.00  126.96  1,245,781.52 
6044+840.00  6.35  12.70  10.00  126.96  1,245,654.56 
6044+860.00  6.35  12.70  10.00  126.96  1,245,527.60 
6044+880.00  6.35  12.70  10.00  126.96  1,245,400.64 
6044+900.00  6.35  12.70  10.00  126.96  1,245,273.68 
6044+920.00  6.35  12.70  10.00  126.96  1,245,146.72 
6044+940.00  6.35  12.70  10.00  126.96  1,245,019.76 
6044+960.00  6.35  12.70  10.00  126.96  1,244,892.80 
6044+980.00  6.35  12.70  10.00  126.96  1,244,765.84 
6045+000.00  6.35  12.70  10.00  126.96  1,244,638.88 
6045+020.00  6.35  12.70  10.00  126.96  1,244,511.92 
6045+040.00  6.35  12.70  10.00  126.96  1,244,384.96 
6045+060.00  6.35  12.70  10.00  126.96  1,244,258.00 
6045+080.00  6.35  12.70  10.00  126.96  1,244,131.04 
6045+100.00  6.35  12.70  10.00  126.96  1,244,004.08 
6045+120.00  6.35  12.70  10.00  126.96  1,243,877.12 
6045+140.00  6.35  12.70  10.00  126.96  1,243,750.16 
6045+160.00  6.35  12.70  10.00  126.96  1,243,623.20 
6045+180.00  6.35  12.70  10.00  126.96  1,243,496.24 
6045+200.00  6.35  12.70  10.00  126.96  1,243,369.28 
6045+220.00  6.35  12.70  10.00  126.96  1,243,242.32 

436 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6045+240.00  6.35  12.70  10.00  126.96  1,243,115.36 


6045+260.00  6.35  12.70  10.00  126.96  1,242,988.40 
6045+280.00  6.35  12.70  10.00  126.96  1,242,861.44 
6045+300.00  6.35  12.70  10.00  126.96  1,242,734.48 
6045+320.00  6.35  12.70  10.00  126.96  1,242,607.52 
6045+340.00  6.35  12.70  10.00  126.96  1,242,480.56 
6045+360.00  6.35  12.70  10.00  126.96  1,242,353.60 
6045+380.00  6.35  12.70  10.00  126.96  1,242,226.64 
6045+400.00  6.35  12.70  10.00  126.96  1,242,099.68 
6045+420.00  6.35  12.70  10.00  126.96  1,241,972.72 
6045+440.00  6.35  12.70  10.00  126.96  1,241,845.76 
6045+460.00  6.35  12.70  10.00  126.96  1,241,718.80 
6045+480.00  6.35  12.70  10.00  126.96  1,241,591.84 
6045+500.00  6.35  12.70  10.00  126.96  1,241,464.88 
6045+520.00  6.35  12.70  10.00  126.96  1,241,337.92 
6045+540.00  6.35  12.70  10.00  126.96  1,241,210.96 
6045+560.00  6.35  12.70  10.00  126.96  1,241,084.00 
6045+580.00  6.35  12.70  10.00  126.96  1,240,957.04 
6045+600.00  6.35  12.70  10.00  126.96  1,240,830.08 
6045+620.00  6.35  12.70  10.00  126.96  1,240,703.12 
6045+640.00  6.35  12.70  10.00  126.96  1,240,576.16 
6045+660.00  6.35  12.70  10.00  126.96  1,240,449.20 
6045+680.00  6.35  12.70  10.00  126.96  1,240,322.24 
6045+700.00  6.35  12.70  10.00  126.96  1,240,195.28 
6045+720.00  6.35  12.70  10.00  126.96  1,240,068.32 
6045+740.00  6.35  12.70  10.00  126.96  1,239,941.36 
6045+760.00  6.35  12.70  10.00  126.96  1,239,814.40 
6045+780.00  6.35  12.70  10.00  126.96  1,239,687.44 
6045+800.00  6.35  12.70  10.00  126.96  1,239,560.48 
6045+820.00  6.35  12.70  10.00  126.96  1,239,433.52 
6045+840.00  6.35  12.70  10.00  126.96  1,239,306.56 
6045+860.00  6.35  12.70  10.00  126.96  1,239,179.60 
6045+880.00  6.35  12.70  10.00  126.96  1,239,052.64 
6045+900.00  6.35  12.70  10.00  126.96  1,238,925.68 
6045+920.00  6.35  12.70  10.00  126.96  1,238,798.72 
6045+940.00  6.35  12.70  10.00  126.96  1,238,671.76 
6045+960.00  6.35  12.70  10.00  126.96  1,238,544.80 
6045+980.00  6.35  12.70  10.00  126.96  1,238,417.84 
6046+000.00  6.35  12.70  10.00  126.96  1,238,290.88 
6046+020.00  6.35  12.70  10.00  126.96  1,238,163.92 
6046+040.00  6.35  12.70  10.00  126.96  1,238,036.96 
6046+060.00  6.35  12.70  10.00  126.96  1,237,910.00 
6046+080.00  6.35  12.70  10.00  126.96  1,237,783.04 
6046+100.00  6.35  12.70  10.00  126.96  1,237,656.08 
6046+120.00  6.35  12.70  10.00  126.96  1,237,529.12 
6046+140.00  6.35  12.70  10.00  126.96  1,237,402.16 
6046+160.00  6.35  12.70  10.00  126.96  1,237,275.20 
6046+180.00  6.35  12.70  10.00  126.96  1,237,148.24 
6046+200.00  6.35  12.70  10.00  126.96  1,237,021.28 
6046+220.00  6.35  12.70  10.00  126.96  1,236,894.32 
6046+240.00  6.35  12.70  10.00  126.96  1,236,767.36 

437 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6046+260.00  6.35  12.70  10.00  126.96  1,236,640.40 


6046+280.00  6.35  12.70  10.00  126.96  1,236,513.44 
6046+300.00  6.35  12.70  10.00  126.96  1,236,386.48 
6046+320.00  6.35  12.70  10.00  126.96  1,236,259.52 
6046+340.00  6.35  12.70  10.00  126.96  1,236,132.56 
6046+360.00  6.35  12.70  10.00  126.96  1,236,005.60 
6046+380.00  6.35  12.70  10.00  126.96  1,235,878.64 
6046+400.00  6.35  12.70  10.00  126.96  1,235,751.68 
6046+420.00  6.35  12.70  10.00  126.96  1,235,624.72 
6046+440.00  6.35  12.70  10.00  126.96  1,235,497.76 
6046+460.00  6.35  12.70  10.00  126.96  1,235,370.80 
6046+480.00  6.35  12.70  10.00  126.96  1,235,243.84 
6046+500.00  6.35  12.70  10.00  126.96  1,235,116.88 
6046+520.00  6.35  12.70  10.00  126.96  1,234,989.92 
6046+540.00  6.35  12.70  10.00  126.96  1,234,862.96 
6046+560.00  6.35  12.70  10.00  126.96  1,234,736.00 
6046+580.00  6.35  12.70  10.00  126.96  1,234,609.04 
6046+600.00  6.35  12.70  10.00  126.96  1,234,482.08 
6046+620.00  6.35  12.70  10.00  126.96  1,234,355.12 
6046+640.00  6.35  12.70  10.00  126.96  1,234,228.16 
6046+660.00  6.35  12.70  10.00  126.96  1,234,101.20 
6046+680.00  6.35  12.70  10.00  126.96  1,233,974.24 
6046+700.00  6.35  12.70  10.00  126.96  1,233,847.28 
6046+720.00  6.35  12.70  10.00  126.96  1,233,720.32 
6046+740.00  6.35  12.70  10.00  126.96  1,233,593.36 
6046+760.00  6.35  12.70  10.00  126.96  1,233,466.40 
6046+780.00  6.35  12.70  10.00  126.96  1,233,339.44 
6046+800.00  6.35  12.70  10.00  126.96  1,233,212.48 
6046+820.00  6.35  12.70  10.00  126.96  1,233,085.52 
6046+840.00  6.35  12.70  10.00  126.96  1,232,958.56 
6046+860.00  6.35  12.70  10.00  126.96  1,232,831.60 
6046+880.00  6.35  12.70  10.00  126.96  1,232,704.64 
6046+900.00  6.35  12.70  10.00  126.96  1,232,577.68 
6046+920.00  6.35  12.70  10.00  126.96  1,232,450.72 
6046+940.00  6.35  12.70  10.00  126.96  1,232,323.76 
6046+960.00  6.35  12.70  10.00  126.96  1,232,196.80 
6046+980.00  6.35  12.70  10.00  126.96  1,232,069.84 
6047+000.00  6.35  12.70  10.00  126.96  1,231,942.88 
6047+000.00  6.35  12.70  0.00  0.00  1,231,942.88 
6047+020.00  6.35  12.70  10.00  126.96  1,231,815.92 
6047+040.00  6.35  12.70  10.00  126.96  1,231,688.96 
6047+060.00  6.35  12.70  10.00  126.96  1,231,562.00 
6047+060.00  6.35  12.70  0.00  0.00  1,231,562.00 
6047+080.00  6.35  12.70  10.00  126.96  1,231,435.04 
6047+100.00  6.35  12.70  10.00  126.96  1,231,308.08 
6047+120.00  6.35  12.70  10.00  126.96  1,231,181.12 
6047+140.00  6.35  12.70  10.00  126.96  1,231,054.16 
6047+160.00  6.35  12.70  10.00  126.96  1,230,927.20 
6047+180.00  6.35  12.70  10.00  126.96  1,230,800.24 
6047+200.00  6.35  12.70  10.00  126.96  1,230,673.28 
6047+220.00  6.35  12.70  10.00  126.96  1,230,546.32 

438 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6047+240.00  6.35  12.70  10.00  126.96  1,230,419.36 


6047+260.00  6.35  12.70  10.00  126.96  1,230,292.40 
6047+280.00  6.35  12.70  10.00  126.96  1,230,165.44 
6047+300.00  6.35  12.70  10.00  126.96  1,230,038.48 
6047+320.00  6.35  12.70  10.00  126.96  1,229,911.52 
6047+340.00  6.35  12.70  10.00  126.96  1,229,784.56 
6047+360.00  6.35  12.70  10.00  126.96  1,229,657.60 
6047+380.00  6.35  12.70  10.00  126.96  1,229,530.64 
6047+400.00  6.35  12.70  10.00  126.96  1,229,403.68 
6047+420.00  6.35  12.70  10.00  126.96  1,229,276.72 
6047+440.00  6.35  12.70  10.00  126.96  1,229,149.76 
6047+460.00  6.35  12.70  10.00  126.96  1,229,022.80 
6047+480.00  6.35  12.70  10.00  126.96  1,228,895.84 
6047+500.00  6.35  12.70  10.00  126.96  1,228,768.88 
6047+510.00  6.35  12.70  5.00  63.48  1,228,705.40 
6047+510.00  6.35  12.70  0.00  0.00  1,228,705.40 
6047+520.00  6.35  12.70  5.00  63.48  1,228,641.92 
6047+540.00  6.35  12.70  10.00  126.96  1,228,514.96 
6047+560.00  6.35  12.70  10.00  126.96  1,228,388.00 
6047+580.00  6.35  12.70  10.00  126.96  1,228,261.04 
6047+580.00  6.35  12.70  0.00  0.00  1,228,261.04 
6047+600.00  6.35  12.70  10.00  126.96  1,228,134.08 
6047+620.00  6.35  12.70  10.00  126.97  1,228,007.11 
6047+640.00  6.35  12.70  10.00  126.98  1,227,880.13 
6047+660.00  6.35  12.70  10.00  126.98  1,227,753.15 
6047+680.00  6.35  12.70  10.00  126.97  1,227,626.18 
6047+700.00  6.35  12.70  10.00  126.96  1,227,499.22 
6047+720.00  6.35  12.70  10.00  126.96  1,227,372.26 
6047+740.00  6.35  12.70  10.00  126.96  1,227,245.30 
6047+760.00  6.35  12.70  10.00  126.96  1,227,118.34 
6047+780.00  6.35  12.70  10.00  126.96  1,226,991.38 
6047+800.00  6.35  12.70  10.00  126.96  1,226,864.42 
6047+820.00  6.35  12.70  10.00  126.96  1,226,737.46 
6047+840.00  6.35  12.70  10.00  126.97  1,226,610.49 
6047+860.00  6.35  12.70  10.00  126.97  1,226,483.52 
6047+880.00  6.35  12.70  10.00  126.96  1,226,356.56 
6047+900.00  6.35  12.70  10.00  126.96  1,226,229.60 
6047+920.00  6.35  12.70  10.00  126.96  1,226,102.64 
6047+940.00  6.35  12.70  10.00  126.97  1,225,975.67 
6047+960.00  6.35  12.70  10.00  126.97  1,225,848.70 
6047+980.00  6.35  12.70  10.00  126.96  1,225,721.74 
6048+000.00  6.35  12.70  10.00  126.96  1,225,594.78 
6048+020.00  6.35  12.70  10.00  126.96  1,225,467.82 
6048+040.00  6.35  12.70  10.00  126.96  1,225,340.86 
6048+060.00  6.35  12.70  10.00  126.96  1,225,213.90 
6048+080.00  6.35  12.70  10.00  126.96  1,225,086.94 
6048+100.00  6.35  12.70  10.00  126.96  1,224,959.98 
6048+120.00  6.35  12.70  10.00  126.96  1,224,833.02 
6048+140.00  6.35  12.70  10.00  126.96  1,224,706.06 
6048+160.00  6.35  12.70  10.00  126.96  1,224,579.10 
6048+180.00  6.35  12.70  10.00  126.96  1,224,452.14 

439 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6048+200.00  6.35  12.70  10.00  126.96  1,224,325.18 


6048+220.00  6.35  12.70  10.00  126.96  1,224,198.22 
6048+240.00  6.35  12.70  10.00  126.96  1,224,071.26 
6048+260.00  6.35  12.70  10.00  126.96  1,223,944.30 
6048+280.00  6.35  12.70  10.00  126.96  1,223,817.34 
6048+300.00  6.35  12.70  10.00  126.96  1,223,690.38 
6048+320.00  6.35  12.70  10.00  126.96  1,223,563.42 
6048+340.00  6.35  12.70  10.00  126.96  1,223,436.46 
6048+360.00  6.35  12.70  10.00  126.96  1,223,309.50 
6048+380.00  6.35  12.70  10.00  126.96  1,223,182.54 
6048+400.00  6.35  12.70  10.00  126.96  1,223,055.58 
6048+420.00  6.35  12.70  10.00  126.96  1,222,928.62 
6048+440.00  6.35  12.70  10.00  126.96  1,222,801.66 
6048+460.00  6.35  12.70  10.00  126.96  1,222,674.70 
6048+480.00  6.35  12.70  10.00  126.96  1,222,547.74 
6048+500.00  6.35  12.70  10.00  126.96  1,222,420.78 
6048+520.00  6.35  12.70  10.00  126.96  1,222,293.82 
6048+540.00  6.35  12.70  10.00  126.96  1,222,166.86 
6048+560.00  6.35  12.70  10.00  126.96  1,222,039.90 
6048+580.00  6.35  12.70  10.00  126.96  1,221,912.94 
6048+600.00  6.35  12.70  10.00  126.96  1,221,785.98 
6048+620.00  6.35  12.70  10.00  126.96  1,221,659.02 
6048+640.00  6.35  12.70  10.00  126.96  1,221,532.06 
6048+660.00  6.35  12.70  10.00  126.96  1,221,405.10 
6048+680.00  6.35  12.70  10.00  126.96  1,221,278.14 
6048+700.00  6.35  12.70  10.00  126.96  1,221,151.18 
6048+720.00  6.35  12.70  10.00  126.96  1,221,024.22 
6048+740.00  6.35  12.70  10.00  126.97  1,220,897.25 
6048+760.00  6.35  12.70  10.00  126.97  1,220,770.28 
6048+780.00  6.35  12.70  10.00  126.96  1,220,643.32 
6048+800.00  6.35  12.70  10.00  126.96  1,220,516.36 
6048+820.00  6.35  12.70  10.00  126.96  1,220,389.40 
6048+840.00  6.35  12.70  10.00  126.96  1,220,262.44 
6048+860.00  6.35  12.70  10.00  126.96  1,220,135.48 
6048+880.00  6.35  12.70  10.00  126.96  1,220,008.52 
6048+900.00  6.35  12.70  10.00  126.96  1,219,881.56 
6048+920.00  6.35  12.70  10.00  126.96  1,219,754.60 
6048+940.00  6.35  12.70  10.00  126.96  1,219,627.64 
6048+960.00  6.35  12.70  10.00  126.96  1,219,500.68 
6048+980.00  6.35  12.70  10.00  126.97  1,219,373.71 
6049+000.00  6.35  12.70  10.00  126.97  1,219,246.74 
6049+020.00  6.35  12.70  10.00  126.97  1,219,119.77 
6049+040.00  6.35  12.70  10.00  126.97  1,218,992.80 
6049+060.00  6.35  12.70  10.00  126.97  1,218,865.83 
6049+080.00  6.35  12.70  10.00  126.97  1,218,738.86 
6049+100.00  6.35  12.70  10.00  126.97  1,218,611.89 
6049+120.00  6.35  12.70  10.00  126.97  1,218,484.92 
6049+140.00  6.35  12.70  10.00  126.97  1,218,357.95 
6049+160.00  6.35  12.70  10.00  126.97  1,218,230.98 
6049+180.00  6.35  12.70  10.00  126.97  1,218,104.01 
6049+200.00  6.35  12.70  10.00  126.97  1,217,977.04 

440 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6049+220.00  6.35  12.70  10.00  126.97  1,217,850.07 


6049+240.00  6.35  12.70  10.00  126.97  1,217,723.10 
6049+260.00  6.35  12.70  10.00  126.97  1,217,596.13 
6049+280.00  6.35  12.70  10.00  126.97  1,217,469.16 
6049+300.00  6.35  12.70  10.00  126.97  1,217,342.19 
6049+320.00  6.35  12.70  10.00  126.97  1,217,215.22 
6049+340.00  6.35  12.70  10.00  126.97  1,217,088.25 
6049+360.00  6.35  12.70  10.00  126.98  1,216,961.27 
6049+380.00  6.35  12.70  10.00  126.98  1,216,834.29 
6049+400.00  6.35  12.70  10.00  126.97  1,216,707.32 
6049+420.00  6.35  12.70  10.00  126.96  1,216,580.36 
6049+440.00  6.35  12.70  10.00  126.97  1,216,453.39 
6049+460.00  6.35  12.70  10.00  126.98  1,216,326.41 
6049+480.00  6.35  12.70  10.00  126.97  1,216,199.44 
6049+500.00  6.35  12.70  10.00  126.96  1,216,072.48 
6049+520.00  6.35  12.70  10.00  126.96  1,215,945.52 
6049+540.00  6.35  12.70  10.00  126.96  1,215,818.56 
6049+560.00  6.35  12.70  10.00  126.96  1,215,691.60 
6049+580.00  6.35  12.70  10.00  126.96  1,215,564.64 
6049+600.00  6.35  12.70  10.00  126.96  1,215,437.68 
6049+620.00  6.35  12.70  10.00  126.96  1,215,310.72 
6049+640.00  6.35  12.70  10.00  126.96  1,215,183.76 
6049+660.00  6.35  12.70  10.00  126.96  1,215,056.80 
6049+680.00  6.35  12.70  10.00  126.96  1,214,929.84 
6049+700.00  6.35  12.70  10.00  126.96  1,214,802.88 
6049+720.00  6.35  12.70  10.00  126.96  1,214,675.92 
6049+740.00  6.35  12.70  10.00  126.96  1,214,548.96 
6049+760.00  6.35  12.70  10.00  126.96  1,214,422.00 
6049+780.00  6.35  12.70  10.00  126.96  1,214,295.04 
6049+800.00  6.35  12.70  10.00  126.96  1,214,168.08 
6049+820.00  6.35  12.70  10.00  126.96  1,214,041.12 
6049+840.00  6.35  12.70  10.00  126.96  1,213,914.16 
6049+860.00  6.35  12.70  10.00  126.96  1,213,787.20 
6049+880.00  6.35  12.70  10.00  126.96  1,213,660.24 
6049+900.00  6.35  12.70  10.00  126.96  1,213,533.28 
6049+920.00  6.35  12.70  10.00  126.96  1,213,406.32 
6049+940.00  6.35  12.70  10.00  126.96  1,213,279.36 
6049+960.00  6.35  12.70  10.00  126.96  1,213,152.40 
6049+980.00  6.35  12.70  10.00  126.96  1,213,025.44 
6050+000.00  6.35  12.70  10.00  126.96  1,212,898.48 
6050+020.00  6.35  12.70  10.00  126.96  1,212,771.52 
6050+040.00  6.35  12.70  10.00  126.96  1,212,644.56 
6050+060.00  6.35  12.70  10.00  126.96  1,212,517.60 
6050+080.00  6.35  12.70  10.00  126.96  1,212,390.64 
6050+100.00  6.35  12.70  10.00  126.96  1,212,263.68 
6050+120.00  6.35  12.70  10.00  126.96  1,212,136.72 
6050+140.00  6.35  12.70  10.00  126.96  1,212,009.76 
6050+160.00  6.35  12.70  10.00  126.96  1,211,882.80 
6050+180.00  6.35  12.70  10.00  126.96  1,211,755.84 
6050+200.00  6.35  12.70  10.00  126.96  1,211,628.88 
6050+220.00  6.35  12.70  10.00  126.96  1,211,501.92 

441 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6050+240.00  6.35  12.70  10.00  126.96  1,211,374.96 


6050+260.00  6.35  12.70  10.00  126.96  1,211,248.00 
6050+280.00  6.35  12.70  10.00  126.96  1,211,121.04 
6050+300.00  6.35  12.70  10.00  126.96  1,210,994.08 
6050+320.00  6.35  12.70  10.00  126.96  1,210,867.12 
6050+340.00  6.35  12.70  10.00  126.96  1,210,740.16 
6050+360.00  6.35  12.70  10.00  126.96  1,210,613.20 
6050+380.00  6.35  12.70  10.00  126.96  1,210,486.24 
6050+400.00  6.35  12.70  10.00  126.96  1,210,359.28 
6050+420.00  6.35  12.70  10.00  126.96  1,210,232.32 
6050+440.00  6.35  12.70  10.00  126.96  1,210,105.36 
6050+460.00  6.35  12.70  10.00  126.96  1,209,978.40 
6050+480.00  6.35  12.70  10.00  126.97  1,209,851.43 
6050+500.00  6.35  12.70  10.00  126.97  1,209,724.46 
6050+520.00  6.35  12.70  10.00  126.97  1,209,597.49 
6050+540.00  6.35  12.70  10.00  126.97  1,209,470.52 
6050+560.00  6.35  12.70  10.00  126.96  1,209,343.56 
6050+580.00  6.35  12.70  10.00  126.96  1,209,216.60 
6050+600.00  6.35  12.70  10.00  126.96  1,209,089.64 
6050+620.00  6.35  12.70  10.00  126.96  1,208,962.68 
6050+640.00  6.35  12.70  10.00  126.97  1,208,835.71 
6050+660.00  6.35  12.70  10.00  126.97  1,208,708.74 
6050+680.00  6.35  12.70  10.00  126.96  1,208,581.78 
6050+700.00  6.35  12.70  10.00  126.96  1,208,454.82 
6050+720.00  6.35  12.70  10.00  126.97  1,208,327.85 
6050+740.00  6.35  12.70  10.00  126.97  1,208,200.88 
6050+760.00  6.35  12.70  10.00  126.97  1,208,073.91 
6050+780.00  6.35  12.70  10.00  126.97  1,207,946.94 
6050+800.00  6.35  12.70  10.00  126.96  1,207,819.98 
6050+820.00  6.35  12.70  10.00  126.97  1,207,693.01 
6050+840.00  6.35  12.70  10.00  126.97  1,207,566.04 
6050+860.00  6.35  12.70  10.00  126.97  1,207,439.07 
6050+880.00  6.35  12.70  10.00  126.97  1,207,312.10 
6050+900.00  6.35  12.70  10.00  126.96  1,207,185.14 
6050+920.00  6.35  12.70  10.00  126.96  1,207,058.18 
6050+940.00  6.35  12.70  10.00  126.96  1,206,931.22 
6050+960.00  6.35  12.70  10.00  126.96  1,206,804.26 
6050+980.00  6.35  12.70  10.00  126.96  1,206,677.30 
6051+000.00  6.35  12.70  10.00  126.96  1,206,550.34 
6051+020.00  6.35  12.70  10.00  126.96  1,206,423.38 
6051+040.00  6.35  12.70  10.00  126.96  1,206,296.42 
6051+060.00  6.35  12.70  10.00  126.96  1,206,169.46 
6051+080.00  6.35  12.70  10.00  126.96  1,206,042.50 
6051+100.00  6.35  12.70  10.00  126.96  1,205,915.54 
6051+120.00  6.35  12.70  10.00  126.96  1,205,788.58 
6051+140.00  6.35  12.70  10.00  126.96  1,205,661.62 
6051+160.00  6.35  12.70  10.00  126.96  1,205,534.66 
6051+180.00  6.35  12.70  10.00  126.96  1,205,407.70 
6051+200.00  6.35  12.70  10.00  126.96  1,205,280.74 
6051+220.00  6.35  12.70  10.00  126.96  1,205,153.78 
6051+240.00  6.35  12.70  10.00  126.96  1,205,026.82 

442 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6051+260.00  6.35  12.70  10.00  126.96  1,204,899.86 


6051+280.00  6.35  12.70  10.00  126.96  1,204,772.90 
6051+300.00  6.35  12.70  10.00  126.96  1,204,645.94 
6051+320.00  6.35  12.70  10.00  126.96  1,204,518.98 
6051+340.00  6.35  12.70  10.00  126.96  1,204,392.02 
6051+360.00  6.35  12.70  10.00  126.96  1,204,265.06 
6051+380.00  6.35  12.70  10.00  126.96  1,204,138.10 
6051+400.00  6.35  12.70  10.00  126.96  1,204,011.14 
6051+420.00  6.35  12.70  10.00  126.96  1,203,884.18 
6051+440.00  6.35  12.70  10.00  126.96  1,203,757.22 
6051+460.00  6.35  12.70  10.00  126.96  1,203,630.26 
6051+480.00  6.35  12.70  10.00  126.96  1,203,503.30 
6051+500.00  6.35  12.70  10.00  126.96  1,203,376.34 
6051+520.00  6.35  12.70  10.00  126.96  1,203,249.38 
6051+540.00  6.35  12.70  10.00  126.96  1,203,122.42 
6051+560.00  6.35  12.70  10.00  126.96  1,202,995.46 
6051+580.00  6.35  12.70  10.00  126.96  1,202,868.50 
6051+600.00  6.35  12.70  10.00  126.96  1,202,741.54 
6051+620.00  6.35  12.70  10.00  126.96  1,202,614.58 
6051+640.00  6.35  12.70  10.00  126.96  1,202,487.62 
6051+660.00  6.35  12.70  10.00  126.96  1,202,360.66 
6051+680.00  6.35  12.70  10.00  126.96  1,202,233.70 
6051+700.00  6.35  12.70  10.00  126.96  1,202,106.74 
6051+720.00  6.35  12.70  10.00  126.96  1,201,979.78 
6051+740.00  6.35  12.70  10.00  126.96  1,201,852.82 
6051+760.00  6.35  12.70  10.00  126.96  1,201,725.86 
6051+780.00  6.35  12.70  10.00  126.96  1,201,598.90 
6051+800.00  6.35  12.70  10.00  126.96  1,201,471.94 
6051+820.00  6.35  12.70  10.00  126.96  1,201,344.98 
6051+840.00  6.35  12.70  10.00  126.96  1,201,218.02 
6051+860.00  6.35  12.70  10.00  126.96  1,201,091.06 
6051+880.00  6.35  12.70  10.00  126.96  1,200,964.10 
6051+900.00  6.35  12.70  10.00  126.96  1,200,837.14 
6051+920.00  6.35  12.70  10.00  126.96  1,200,710.18 
6051+940.00  6.35  12.70  10.00  126.96  1,200,583.22 
6051+960.00  6.35  12.70  10.00  126.96  1,200,456.26 
6051+980.00  6.35  12.70  10.00  126.96  1,200,329.30 
6052+000.00  6.35  12.70  10.00  126.96  1,200,202.34 
6052+020.00  6.35  12.70  10.00  126.96  1,200,075.38 
6052+040.00  6.35  12.70  10.00  126.96  1,199,948.42 
6052+060.00  6.35  12.70  10.00  126.96  1,199,821.46 
6052+080.00  6.35  12.70  10.00  126.96  1,199,694.50 
6052+100.00  6.35  12.70  10.00  126.96  1,199,567.54 
6052+120.00  6.35  12.70  10.00  126.96  1,199,440.58 
6052+140.00  6.35  12.70  10.00  126.96  1,199,313.62 
6052+160.00  6.35  12.70  10.00  126.96  1,199,186.66 
6052+180.00  6.35  12.70  10.00  126.96  1,199,059.70 
6052+200.00  6.35  12.70  10.00  126.96  1,198,932.74 
6052+220.00  6.35  12.70  10.00  126.96  1,198,805.78 
6052+240.00  6.35  12.70  10.00  126.96  1,198,678.82 
6052+260.00  6.35  12.70  10.00  126.96  1,198,551.86 

443 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6052+280.00  6.35  12.70  10.00  126.96  1,198,424.90 


6052+300.00  6.35  12.70  10.00  126.96  1,198,297.94 
6052+320.00  6.35  12.70  10.00  126.96  1,198,170.98 
6052+340.00  6.35  12.70  10.00  126.96  1,198,044.02 
6052+360.00  6.35  12.70  10.00  126.96  1,197,917.06 
6052+380.00  6.35  12.70  10.00  126.96  1,197,790.10 
6052+400.00  6.35  12.70  10.00  126.96  1,197,663.14 
6052+420.00  6.35  12.70  10.00  126.96  1,197,536.18 
6052+420.00  6.35  12.70  0.00  0.00  1,197,536.18 
6052+440.00  6.35  12.70  10.00  126.96  1,197,409.22 
6052+460.00  6.35  12.70  10.00  126.96  1,197,282.26 
6052+480.00  6.35  12.70  10.00  126.96  1,197,155.30 
6052+490.00  6.35  12.70  5.00  63.48  1,197,091.82 
6052+490.00  6.35  12.70  0.00  0.00  1,197,091.82 
6052+500.00  6.35  12.70  5.00  63.48  1,197,028.34 
6052+520.00  6.35  12.70  10.00  126.96  1,196,901.38 
6052+540.00  6.35  12.70  10.00  126.96  1,196,774.42 
6052+560.00  6.35  12.70  10.00  126.96  1,196,647.46 
6052+580.00  6.35  12.70  10.00  126.96  1,196,520.50 
6052+600.00  6.35  12.70  10.00  126.96  1,196,393.54 
6052+620.00  6.35  12.70  10.00  126.96  1,196,266.58 
6052+640.00  6.35  12.70  10.00  126.96  1,196,139.62 
6052+660.00  6.35  12.70  10.00  126.96  1,196,012.66 
6052+680.00  6.35  12.70  10.00  126.96  1,195,885.70 
6052+700.00  6.35  12.70  10.00  126.96  1,195,758.74 
6052+720.00  6.35  12.70  10.00  126.96  1,195,631.78 
6052+740.00  6.35  12.70  10.00  126.96  1,195,504.82 
6052+760.00  6.35  12.70  10.00  126.96  1,195,377.86 
6052+780.00  6.35  12.70  10.00  126.96  1,195,250.90 
6052+800.00  6.35  12.70  10.00  126.96  1,195,123.94 
6052+820.00  6.35  12.70  10.00  126.96  1,194,996.98 
6052+840.00  6.35  12.70  10.00  126.96  1,194,870.02 
6052+860.00  6.35  12.70  10.00  126.96  1,194,743.06 
6052+880.00  6.35  12.70  10.00  126.96  1,194,616.10 
6052+900.00  6.35  12.70  10.00  126.96  1,194,489.14 
6052+920.00  6.35  12.70  10.00  126.96  1,194,362.18 
6052+940.00  6.35  12.70  10.00  126.96  1,194,235.22 
6052+960.00  6.35  12.70  10.00  126.96  1,194,108.26 
6052+980.00  6.35  12.70  10.00  126.96  1,193,981.30 
6053+000.00  6.35  12.70  10.00  126.96  1,193,854.34 
6053+020.00  6.35  12.70  10.00  126.96  1,193,727.38 
6053+040.00  6.35  12.70  10.00  126.96  1,193,600.42 
6053+060.00  6.35  12.70  10.00  126.96  1,193,473.46 
6053+080.00  6.35  12.70  10.00  126.96  1,193,346.50 
6053+100.00  6.35  12.70  10.00  126.96  1,193,219.54 
6053+120.00  6.35  12.70  10.00  126.96  1,193,092.58 
6053+140.00  6.35  12.70  10.00  126.96  1,192,965.62 
6053+160.00  6.35  12.70  10.00  126.96  1,192,838.66 
6053+180.00  6.35  12.70  10.00  126.96  1,192,711.70 
6053+200.00  6.35  12.70  10.00  126.96  1,192,584.74 
6053+220.00  6.35  12.70  10.00  126.96  1,192,457.78 

444 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6053+240.00  6.35  12.70  10.00  126.96  1,192,330.82 


6053+260.00  6.35  12.70  10.00  126.96  1,192,203.86 
6053+280.00  6.35  12.70  10.00  126.96  1,192,076.90 
6053+300.00  6.35  12.70  10.00  126.96  1,191,949.94 
6053+320.00  6.35  12.70  10.00  126.96  1,191,822.98 
6053+340.00  6.35  12.70  10.00  126.96  1,191,696.02 
6053+360.00  6.35  12.70  10.00  126.97  1,191,569.05 
6053+380.00  6.35  12.70  10.00  126.97  1,191,442.08 
6053+400.00  6.35  12.70  10.00  126.96  1,191,315.12 
6053+420.00  6.35  12.70  10.00  126.96  1,191,188.16 
6053+440.00  6.35  12.70  10.00  126.96  1,191,061.20 
6053+460.00  6.35  12.70  10.00  126.97  1,190,934.23 
6053+480.00  6.35  12.70  10.00  126.98  1,190,807.25 
6053+500.00  6.35  12.70  10.00  126.98  1,190,680.27 
6053+520.00  6.35  12.70  10.00  126.97  1,190,553.30 
6053+540.00  6.35  12.70  10.00  126.96  1,190,426.34 
6053+560.00  6.35  12.70  10.00  126.96  1,190,299.38 
6053+580.00  6.35  12.70  10.00  126.96  1,190,172.42 
6053+600.00  6.35  12.70  10.00  126.97  1,190,045.45 
6053+620.00  6.35  12.70  10.00  126.98  1,189,918.47 
6053+640.00  6.35  12.70  10.00  126.97  1,189,791.50 
6053+660.00  6.35  12.70  10.00  126.96  1,189,664.54 
6053+680.00  6.35  12.70  10.00  126.96  1,189,537.58 
6053+700.00  6.35  12.70  10.00  126.96  1,189,410.62 
6053+720.00  6.35  12.70  10.00  126.97  1,189,283.65 
6053+740.00  6.35  12.70  10.00  126.98  1,189,156.67 
6053+760.00  6.35  12.70  10.00  126.97  1,189,029.70 
6053+780.00  6.35  12.70  10.00  126.96  1,188,902.74 
6053+800.00  6.35  12.70  10.00  126.97  1,188,775.77 
6053+820.00  6.35  12.70  10.00  126.97  1,188,648.80 
6053+840.00  6.35  12.70  10.00  126.96  1,188,521.84 
6053+860.00  6.35  12.70  10.00  126.96  1,188,394.88 
6053+880.00  6.35  12.70  10.00  126.96  1,188,267.92 
6053+900.00  6.35  12.70  10.00  126.97  1,188,140.95 
6053+920.00  6.35  12.70  10.00  126.97  1,188,013.98 
6053+940.00  6.35  12.70  10.00  126.96  1,187,887.02 
6053+960.00  6.35  12.70  10.00  126.96  1,187,760.06 
6053+980.00  6.35  12.70  10.00  126.96  1,187,633.10 
6054+000.00  6.35  12.70  10.00  126.97  1,187,506.13 
6054+020.00  6.35  12.70  10.00  126.97  1,187,379.16 
6054+040.00  6.35  12.70  10.00  126.97  1,187,252.19 
6054+060.00  6.35  12.70  10.00  126.97  1,187,125.22 
6054+080.00  6.35  12.70  10.00  126.96  1,186,998.26 
6054+100.00  6.35  12.70  10.00  126.97  1,186,871.29 
6054+120.00  6.35  12.70  10.00  126.97  1,186,744.32 
6054+140.00  6.35  12.70  10.00  126.97  1,186,617.35 
6054+160.00  6.35  12.70  10.00  126.98  1,186,490.37 
6054+180.00  6.35  12.70  10.00  126.97  1,186,363.40 
6054+200.00  6.35  12.70  10.00  126.96  1,186,236.44 
6054+220.00  6.35  12.70  10.00  126.96  1,186,109.48 
6054+240.00  6.35  12.70  10.00  126.97  1,185,982.51 

445 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6054+260.00  6.35  12.70  10.00  126.97  1,185,855.54 


6054+280.00  6.35  12.70  10.00  126.96  1,185,728.58 
6054+300.00  6.35  12.70  10.00  126.96  1,185,601.62 
6054+320.00  6.35  12.70  10.00  126.96  1,185,474.66 
6054+340.00  6.35  12.70  10.00  126.96  1,185,347.70 
6054+360.00  6.35  12.70  10.00  126.96  1,185,220.74 
6054+380.00  6.35  12.70  10.00  126.96  1,185,093.78 
6054+400.00  6.35  12.70  10.00  126.96  1,184,966.82 
6054+420.00  6.35  12.70  10.00  126.96  1,184,839.86 
6054+440.00  6.35  12.70  10.00  126.96  1,184,712.90 
6054+460.00  6.35  12.70  10.00  126.96  1,184,585.94 
6054+480.00  6.35  12.70  10.00  126.96  1,184,458.98 
6054+500.00  6.35  12.70  10.00  126.96  1,184,332.02 
6054+520.00  6.35  12.70  10.00  126.96  1,184,205.06 
6054+540.00  6.35  12.70  10.00  126.96  1,184,078.10 
6054+560.00  6.35  12.70  10.00  126.96  1,183,951.14 
6054+580.00  6.35  12.70  10.00  126.96  1,183,824.18 
6054+600.00  6.35  12.70  10.00  126.96  1,183,697.22 
6054+620.00  6.35  12.70  10.00  126.96  1,183,570.26 
6054+640.00  6.35  12.70  10.00  126.96  1,183,443.30 
6054+660.00  6.35  12.70  10.00  126.96  1,183,316.34 
6054+680.00  6.35  12.70  10.00  126.96  1,183,189.38 
6054+700.00  6.35  12.70  10.00  126.96  1,183,062.42 
6054+720.00  6.35  12.70  10.00  126.97  1,182,935.45 
6054+740.00  6.35  12.70  10.00  126.97  1,182,808.48 
6054+760.00  6.35  12.70  10.00  126.97  1,182,681.51 
6054+780.00  6.35  12.70  10.00  126.98  1,182,554.53 
6054+800.00  6.35  12.70  10.00  126.97  1,182,427.56 
6054+820.00  6.35  12.70  10.00  126.96  1,182,300.60 
6054+840.00  6.35  12.70  10.00  126.96  1,182,173.64 
6054+860.00  6.35  12.70  10.00  126.97  1,182,046.67 
6054+880.00  6.35  12.70  10.00  126.98  1,181,919.69 
6054+900.00  6.35  12.70  10.00  126.97  1,181,792.72 
6054+920.00  6.35  12.70  10.00  126.96  1,181,665.76 
6054+940.00  6.35  12.70  10.00  126.96  1,181,538.80 
6054+960.00  6.35  12.70  10.00  126.97  1,181,411.83 
6054+980.00  6.35  12.70  10.00  126.98  1,181,284.85 
6055+000.00  6.35  12.70  10.00  126.97  1,181,157.88 
6055+020.00  6.35  12.70  10.00  126.96  1,181,030.92 
6055+040.00  6.35  12.70  10.00  126.96  1,180,903.96 
6055+060.00  6.35  12.70  10.00  126.96  1,180,777.00 
6055+080.00  6.35  12.70  10.00  126.97  1,180,650.03 
6055+100.00  6.35  12.70  10.00  126.97  1,180,523.06 
6055+120.00  6.35  12.70  10.00  126.96  1,180,396.10 
6055+140.00  6.35  12.70  10.00  126.97  1,180,269.13 
6055+160.00  6.35  12.70  10.00  126.97  1,180,142.16 
6055+180.00  6.35  12.70  10.00  126.96  1,180,015.20 
6055+200.00  6.35  12.70  10.00  126.96  1,179,888.24 
6055+220.00  6.35  12.70  10.00  126.96  1,179,761.28 
6055+240.00  6.35  12.70  10.00  126.96  1,179,634.32 
6055+260.00  6.35  12.70  10.00  126.96  1,179,507.36 

446 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6055+280.00  6.35  12.70  10.00  126.96  1,179,380.40 


6055+300.00  6.35  12.70  10.00  126.96  1,179,253.44 
6055+320.00  6.35  12.70  10.00  126.96  1,179,126.48 
6055+340.00  6.35  12.70  10.00  126.96  1,178,999.52 
6055+360.00  6.35  12.70  10.00  126.96  1,178,872.56 
6055+380.00  6.35  12.70  10.00  126.96  1,178,745.60 
6055+400.00  6.35  12.70  10.00  126.96  1,178,618.64 
6055+420.00  6.35  12.70  10.00  126.96  1,178,491.68 
6055+440.00  6.35  12.70  10.00  126.96  1,178,364.72 
6055+460.00  6.35  12.70  10.00  126.96  1,178,237.76 
6055+480.00  6.35  12.70  10.00  126.96  1,178,110.80 
6055+500.00  6.35  12.70  10.00  126.96  1,177,983.84 
6055+520.00  6.35  12.70  10.00  126.96  1,177,856.88 
6055+540.00  6.35  12.70  10.00  126.96  1,177,729.92 
6055+560.00  6.35  12.70  10.00  126.96  1,177,602.96 
6055+580.00  6.35  12.70  10.00  126.96  1,177,476.00 
6055+600.00  6.35  12.70  10.00  126.96  1,177,349.04 
6055+620.00  6.35  12.70  10.00  126.96  1,177,222.08 
6055+640.00  6.35  12.70  10.00  126.96  1,177,095.12 
6055+660.00  6.35  12.70  10.00  126.96  1,176,968.16 
6055+680.00  6.35  12.70  10.00  126.96  1,176,841.20 
6055+700.00  6.35  12.70  10.00  126.96  1,176,714.24 
6055+720.00  6.35  12.70  10.00  126.96  1,176,587.28 
6055+740.00  6.35  12.70  10.00  126.96  1,176,460.32 
6055+760.00  6.35  12.70  10.00  126.96  1,176,333.36 
6055+780.00  6.35  12.70  10.00  126.96  1,176,206.40 
6055+800.00  6.35  12.70  10.00  126.96  1,176,079.44 
6055+820.00  6.35  12.70  10.00  126.97  1,175,952.47 
6055+840.00  6.35  12.70  10.00  126.98  1,175,825.49 
6055+860.00  6.35  12.70  10.00  126.97  1,175,698.52 
6055+880.00  6.35  12.70  10.00  126.96  1,175,571.56 
6055+900.00  6.35  12.70  10.00  126.97  1,175,444.59 
6055+920.00  6.35  12.70  10.00  126.98  1,175,317.61 
6055+940.00  6.35  12.70  10.00  126.98  1,175,190.63 
6055+960.00  6.35  12.70  10.00  126.98  1,175,063.65 
6055+980.00  6.35  12.70  10.00  126.97  1,174,936.68 
6056+000.00  6.35  12.70  10.00  126.96  1,174,809.72 
6056+020.00  6.35  12.70  10.00  126.96  1,174,682.76 
6056+040.00  6.35  12.70  10.00  126.96  1,174,555.80 
6056+060.00  6.35  12.70  10.00  126.96  1,174,428.84 
6056+080.00  6.35  12.70  10.00  126.97  1,174,301.87 
6056+100.00  6.35  12.70  10.00  126.97  1,174,174.90 
6056+120.00  6.35  12.70  10.00  126.96  1,174,047.94 
6056+140.00  6.35  12.70  10.00  126.96  1,173,920.98 
6056+160.00  6.35  12.70  10.00  126.96  1,173,794.02 
6056+170.00  6.35  12.70  5.00  63.49  1,173,730.53 
6056+170.00  6.35  12.70  0.00  0.00  1,173,730.53 
6056+180.00  6.35  12.70  5.00  63.49  1,173,667.05 
6056+200.00  6.35  12.70  10.00  126.97  1,173,540.08 
6056+220.00  6.35  12.70  10.00  126.97  1,173,413.11 
6056+240.00  6.35  12.70  10.00  126.97  1,173,286.14 

447 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6056+260.00  6.35  12.70  10.00  126.97  1,173,159.17 


6056+280.00  6.35  12.70  10.00  126.96  1,173,032.21 
6056+300.00  6.35  12.70  10.00  126.96  1,172,905.25 
6056+300.00  6.35  12.70  0.00  0.00  1,172,905.25 
6056+320.00  6.35  12.70  10.00  126.97  1,172,778.28 
6056+340.00  6.35  12.70  10.00  126.98  1,172,651.30 
6056+360.00  6.35  12.70  10.00  126.98  1,172,524.32 
6056+380.00  6.35  12.70  10.00  126.98  1,172,397.34 
6056+400.00  6.35  12.70  10.00  126.98  1,172,270.36 
6056+420.00  6.35  12.70  10.00  126.98  1,172,143.38 
6056+440.00  6.35  12.70  10.00  126.98  1,172,016.40 
6056+460.00  6.35  12.70  10.00  126.98  1,171,889.42 
6056+480.00  6.35  12.70  10.00  126.98  1,171,762.44 
6056+500.00  6.35  12.70  10.00  126.98  1,171,635.46 
6056+520.00  6.35  12.70  10.00  126.98  1,171,508.48 
6056+540.00  6.35  12.70  10.00  126.98  1,171,381.50 
6056+560.00  6.35  12.70  10.00  126.97  1,171,254.53 
6056+580.00  6.35  12.70  10.00  126.96  1,171,127.57 
6056+600.00  6.35  12.70  10.00  126.96  1,171,000.61 
6056+614.06  6.35  12.70  7.03  89.29  1,170,911.32 
6056+620.00  6.35  12.70  2.97  37.68  1,170,873.64 
6056+640.00  6.35  12.70  10.00  126.96  1,170,746.68 
6056+644.06  6.35  12.70  2.03  25.80  1,170,720.88 
6056+660.00  6.35  12.70  7.97  101.16  1,170,619.72 
6056+680.00  6.35  12.70  10.00  126.96  1,170,492.76 
6056+700.00  6.35  12.70  10.00  126.96  1,170,365.80 
6056+720.00  6.35  12.70  10.00  126.96  1,170,238.84 
6056+734.82  6.35  12.70  7.41  94.06  1,170,144.78 
6056+740.00  6.35  12.70  2.59  32.90  1,170,111.88 
6056+760.00  6.35  12.70  10.00  126.96  1,169,984.92 
6056+764.82  6.35  12.70  2.41  30.58  1,169,954.33 
6056+770.00  6.35  12.70  2.59  32.91  1,169,921.43 
6056+770.00  6.35  12.70  0.00  0.00  1,169,921.43 
6056+780.00  6.35  12.70  5.00  63.49  1,169,857.94 
6056+800.00  6.35  12.70  10.00  126.96  1,169,730.98 
6056+820.00  6.35  12.70  10.00  126.96  1,169,604.02 
6056+840.00  6.35  12.70  10.00  126.96  1,169,477.06 
6056+860.00  6.35  12.70  10.00  126.96  1,169,350.10 
6056+860.00  6.35  12.70  0.00  0.00  1,169,350.10 
6056+880.00  6.35  12.70  10.00  126.96  1,169,223.14 
6056+900.00  6.35  12.70  10.00  126.96  1,169,096.18 
6056+920.00  6.35  12.70  10.00  126.96  1,168,969.22 
6056+940.00  6.35  12.70  10.00  126.97  1,168,842.25 
6056+960.00  6.35  12.70  10.00  126.98  1,168,715.27 
6056+980.00  6.35  12.70  10.00  126.98  1,168,588.29 
6057+000.00  6.35  12.70  10.00  126.98  1,168,461.31 
6057+020.00  6.35  12.70  10.00  126.98  1,168,334.33 
6057+040.00  6.35  12.70  10.00  126.98  1,168,207.35 
6057+060.00  6.35  12.70  10.00  126.98  1,168,080.37 
6057+080.00  6.35  12.70  10.00  126.98  1,167,953.39 
6057+100.00  6.35  12.70  10.00  126.98  1,167,826.41 

448 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6057+120.00  6.35  12.70  10.00  126.98  1,167,699.43 


6057+140.00  6.35  12.70  10.00  126.98  1,167,572.45 
6057+160.00  6.35  12.70  10.00  126.98  1,167,445.47 
6057+180.00  6.35  12.70  10.00  126.97  1,167,318.50 
6057+200.00  6.35  12.70  10.00  126.96  1,167,191.54 
6057+220.00  6.35  12.70  10.00  126.96  1,167,064.58 
6057+240.00  6.35  12.70  10.00  126.96  1,166,937.62 
6057+260.00  6.35  12.70  10.00  126.96  1,166,810.66 
6057+270.00  6.35  12.70  5.00  63.49  1,166,747.18 
6057+270.00  6.35  12.70  0.00  0.00  1,166,747.18 
6057+280.00  6.35  12.70  5.00  63.49  1,166,683.69 
6057+300.00  6.35  12.70  10.00  126.96  1,166,556.73 
6057+320.00  6.35  12.70  10.00  126.96  1,166,429.77 
6057+340.00  6.35  12.70  10.00  126.96  1,166,302.81 
6057+340.00  6.35  12.70  0.00  0.00  1,166,302.81 
6057+360.00  6.35  12.70  10.00  126.96  1,166,175.85 
6057+380.00  6.35  12.70  10.00  126.96  1,166,048.89 
6057+400.00  6.35  12.70  10.00  126.96  1,165,921.93 
6057+420.00  6.35  12.70  10.00  126.96  1,165,794.97 
6057+440.00  6.35  12.70  10.00  126.96  1,165,668.01 
6057+460.00  6.35  12.70  10.00  126.96  1,165,541.05 
6057+480.00  6.35  12.70  10.00  126.96  1,165,414.09 
6057+500.00  6.35  12.70  10.00  126.97  1,165,287.12 
6057+520.00  6.35  12.70  10.00  126.98  1,165,160.14 
6057+540.00  6.35  12.70  10.00  126.98  1,165,033.16 
6057+560.00  6.35  12.70  10.00  126.97  1,164,906.19 
6057+580.00  6.35  12.70  10.00  126.96  1,164,779.23 
6057+600.00  6.35  12.70  10.00  126.97  1,164,652.26 
6057+620.00  6.35  12.70  10.00  126.97  1,164,525.29 
6057+640.00  6.35  12.70  10.00  126.96  1,164,398.33 
6057+660.00  6.35  12.70  10.00  126.96  1,164,271.37 
6057+680.00  6.35  12.70  10.00  126.96  1,164,144.41 
6057+700.00  6.35  12.70  10.00  126.96  1,164,017.45 
6057+720.00  6.35  12.70  10.00  126.97  1,163,890.48 
6057+740.00  6.35  12.70  10.00  126.98  1,163,763.50 
6057+760.00  6.35  12.70  10.00  126.98  1,163,636.52 
6057+780.00  6.35  12.70  10.00  126.97  1,163,509.55 
6057+800.00  6.35  12.70  10.00  126.96  1,163,382.59 
6057+820.00  6.35  12.70  10.00  126.96  1,163,255.63 
6057+840.00  6.35  12.70  10.00  126.97  1,163,128.66 
6057+860.00  6.35  12.70  10.00  126.97  1,163,001.69 
6057+880.00  6.35  12.70  10.00  126.97  1,162,874.72 
6057+900.00  6.35  12.70  10.00  126.97  1,162,747.75 
6057+920.00  6.35  12.70  10.00  126.97  1,162,620.78 
6057+940.00  6.35  12.70  10.00  126.97  1,162,493.81 
6057+960.00  6.35  12.70  10.00  126.96  1,162,366.85 
6057+980.00  6.35  12.70  10.00  126.96  1,162,239.89 
6058+000.00  6.35  12.70  10.00  126.96  1,162,112.93 
6058+020.00  6.35  12.70  10.00  126.96  1,161,985.97 
6058+040.00  6.35  12.70  10.00  126.96  1,161,859.01 
6058+060.00  6.35  12.70  10.00  126.96  1,161,732.05 

449 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6058+080.00  6.35  12.70  10.00  126.96  1,161,605.09 


6058+100.00  6.35  12.70  10.00  126.96  1,161,478.13 
6058+120.00  6.35  12.70  10.00  126.96  1,161,351.17 
6058+140.00  6.35  12.70  10.00  126.96  1,161,224.21 
6058+160.00  6.35  12.70  10.00  126.96  1,161,097.25 
6058+180.00  6.35  12.70  10.00  126.96  1,160,970.29 
6058+200.00  6.35  12.70  10.00  126.96  1,160,843.33 
6058+220.00  6.35  12.70  10.00  126.96  1,160,716.37 
6058+240.00  6.35  12.70  10.00  126.96  1,160,589.41 
6058+260.00  6.35  12.70  10.00  126.96  1,160,462.45 
6058+280.00  6.35  12.70  10.00  126.96  1,160,335.49 
6058+300.00  6.35  12.70  10.00  126.96  1,160,208.53 
6058+320.00  6.35  12.70  10.00  126.96  1,160,081.57 
6058+340.00  6.35  12.70  10.00  126.96  1,159,954.61 
6058+360.00  6.35  12.70  10.00  126.96  1,159,827.65 
6058+380.00  6.35  12.70  10.00  126.96  1,159,700.69 
6058+400.00  6.35  12.70  10.00  126.96  1,159,573.73 
6058+420.00  6.35  12.70  10.00  126.96  1,159,446.77 
6058+440.00  6.35  12.70  10.00  126.96  1,159,319.81 
6058+460.00  6.35  12.70  10.00  126.96  1,159,192.85 
6058+480.00  6.35  12.70  10.00  126.96  1,159,065.89 
6058+500.00  6.35  12.70  10.00  126.96  1,158,938.93 
6058+520.00  6.35  12.70  10.00  126.96  1,158,811.97 
6058+540.00  6.35  12.70  10.00  126.96  1,158,685.01 
6058+560.00  6.35  12.70  10.00  126.96  1,158,558.05 
6058+580.00  6.35  12.70  10.00  126.96  1,158,431.09 
6058+600.00  6.35  12.70  10.00  126.96  1,158,304.13 
6058+620.00  6.35  12.70  10.00  126.96  1,158,177.17 
6058+640.00  6.35  12.70  10.00  126.96  1,158,050.21 
6058+660.00  6.35  12.70  10.00  126.96  1,157,923.25 
6058+680.00  6.35  12.70  10.00  126.96  1,157,796.29 
6058+700.00  6.35  12.70  10.00  126.96  1,157,669.33 
6058+720.00  6.35  12.70  10.00  126.96  1,157,542.37 
6058+740.00  6.35  12.70  10.00  126.96  1,157,415.41 
6058+760.00  6.35  12.70  10.00  126.96  1,157,288.45 
6058+780.00  6.35  12.70  10.00  126.96  1,157,161.49 
6058+800.00  6.35  12.70  10.00  126.96  1,157,034.53 
6058+820.00  6.35  12.70  10.00  126.96  1,156,907.57 
6058+840.00  6.35  12.70  10.00  126.96  1,156,780.61 
6058+860.00  6.35  12.70  10.00  126.96  1,156,653.65 
6058+880.00  6.35  12.70  10.00  126.96  1,156,526.69 
6058+900.00  6.35  12.70  10.00  126.96  1,156,399.73 
6058+920.00  6.35  12.70  10.00  126.96  1,156,272.77 
6058+940.00  6.35  12.70  10.00  126.96  1,156,145.81 
6058+960.00  6.35  12.70  10.00  126.96  1,156,018.85 
6058+980.00  6.35  12.70  10.00  126.96  1,155,891.89 
6059+000.00  6.35  12.70  10.00  126.96  1,155,764.93 
6059+020.00  6.35  12.70  10.00  126.96  1,155,637.97 
6059+040.00  6.35  12.70  10.00  126.96  1,155,511.01 
6059+060.00  6.35  12.70  10.00  126.96  1,155,384.05 
6059+080.00  6.35  12.70  10.00  126.96  1,155,257.09 

450 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6059+100.00  6.35  12.70  10.00  126.96  1,155,130.13 


6059+120.00  6.35  12.70  10.00  126.96  1,155,003.17 
6059+140.00  6.35  12.70  10.00  126.96  1,154,876.21 
6059+160.00  6.35  12.70  10.00  126.96  1,154,749.25 
6059+180.00  6.35  12.70  10.00  126.96  1,154,622.29 
6059+200.00  6.35  12.70  10.00  126.96  1,154,495.33 
6059+220.00  6.35  12.70  10.00  126.96  1,154,368.37 
6059+240.00  6.35  12.70  10.00  126.96  1,154,241.41 
6059+260.00  6.35  12.70  10.00  126.96  1,154,114.45 
6059+280.00  6.35  12.70  10.00  126.96  1,153,987.49 
6059+300.00  6.35  12.70  10.00  126.96  1,153,860.53 
6059+320.00  6.35  12.70  10.00  126.96  1,153,733.57 
6059+340.00  6.35  12.70  10.00  126.96  1,153,606.61 
6059+360.00  6.35  12.70  10.00  126.96  1,153,479.65 
6059+380.00  6.35  12.70  10.00  126.96  1,153,352.69 
6059+400.00  6.35  12.70  10.00  126.96  1,153,225.73 
6059+420.00  6.35  12.70  10.00  126.96  1,153,098.77 
6059+440.00  6.35  12.70  10.00  126.96  1,152,971.81 
6059+460.00  6.35  12.70  10.00  126.96  1,152,844.85 
6059+480.00  6.35  12.70  10.00  126.96  1,152,717.89 
6059+500.00  6.35  12.70  10.00  126.96  1,152,590.93 
6059+520.00  6.35  12.70  10.00  126.96  1,152,463.97 
6059+540.00  6.35  12.70  10.00  126.96  1,152,337.01 
6059+560.00  6.35  12.70  10.00  126.96  1,152,210.05 
6059+580.00  6.35  12.70  10.00  126.96  1,152,083.09 
6059+600.00  6.35  12.70  10.00  126.96  1,151,956.13 
6059+620.00  6.35  12.70  10.00  126.96  1,151,829.17 
6059+640.00  6.35  12.70  10.00  126.96  1,151,702.21 
6059+660.00  6.35  12.70  10.00  126.96  1,151,575.25 
6059+680.00  6.35  12.70  10.00  126.96  1,151,448.29 
6059+700.00  6.35  12.70  10.00  126.96  1,151,321.33 
6059+720.00  6.35  12.70  10.00  126.96  1,151,194.37 
6059+740.00  6.35  12.70  10.00  126.96  1,151,067.41 
6059+760.00  6.35  12.70  10.00  126.97  1,150,940.44 
6059+780.00  6.35  12.70  10.00  126.97  1,150,813.47 
6059+800.00  6.35  12.70  10.00  126.96  1,150,686.51 
6059+820.00  6.35  12.70  10.00  126.96  1,150,559.55 
6059+840.00  6.35  12.70  10.00  126.96  1,150,432.59 
6059+860.00  6.35  12.70  10.00  126.96  1,150,305.63 
6059+880.00  6.35  12.70  10.00  126.96  1,150,178.67 
6059+900.00  6.35  12.70  10.00  126.96  1,150,051.71 
6059+920.00  6.35  12.70  10.00  126.96  1,149,924.75 
6059+940.00  6.35  12.70  10.00  126.96  1,149,797.79 
6059+960.00  6.35  12.70  10.00  126.96  1,149,670.83 
6059+980.00  6.35  12.70  10.00  126.96  1,149,543.87 
6060+000.00  6.35  12.70  10.00  126.96  1,149,416.91 
6060+020.00  6.35  12.70  10.00  126.96  1,149,289.95 
6060+040.00  6.35  12.70  10.00  126.96  1,149,162.99 
6060+060.00  6.35  12.70  10.00  126.96  1,149,036.03 
6060+080.00  6.35  12.70  10.00  126.96  1,148,909.07 
6060+100.00  6.35  12.70  10.00  126.96  1,148,782.11 

451 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6060+120.00  6.35  12.70  10.00  126.96  1,148,655.15 


6060+140.00  6.35  12.70  10.00  126.96  1,148,528.19 
6060+160.00  6.35  12.70  10.00  126.96  1,148,401.23 
6060+180.00  6.35  12.70  10.00  126.96  1,148,274.27 
6060+200.00  6.35  12.70  10.00  126.96  1,148,147.31 
6060+220.00  6.35  12.70  10.00  126.96  1,148,020.35 
6060+240.00  6.35  12.70  10.00  126.96  1,147,893.39 
6060+260.00  6.35  12.70  10.00  126.96  1,147,766.43 
6060+280.00  6.35  12.70  10.00  126.96  1,147,639.47 
6060+300.00  6.35  12.70  10.00  126.96  1,147,512.51 
6060+320.00  6.35  12.70  10.00  126.96  1,147,385.55 
6060+340.00  6.35  12.70  10.00  126.96  1,147,258.59 
6060+360.00  6.35  12.70  10.00  126.96  1,147,131.63 
6060+380.00  6.35  12.70  10.00  126.96  1,147,004.67 
6060+400.00  6.35  12.70  10.00  126.96  1,146,877.71 
6060+420.00  6.35  12.70  10.00  126.96  1,146,750.75 
6060+440.00  6.35  12.70  10.00  126.96  1,146,623.79 
6060+460.00  6.35  12.70  10.00  126.96  1,146,496.83 
6060+480.00  6.35  12.70  10.00  126.96  1,146,369.87 
6060+500.00  6.35  12.70  10.00  126.96  1,146,242.91 
6060+520.00  6.35  12.70  10.00  126.96  1,146,115.95 
6060+540.00  6.35  12.70  10.00  126.96  1,145,988.99 
6060+560.00  6.35  12.70  10.00  126.96  1,145,862.03 
6060+580.00  6.35  12.70  10.00  126.96  1,145,735.07 
6060+600.00  6.35  12.70  10.00  126.96  1,145,608.11 
6060+620.00  6.35  12.70  10.00  126.96  1,145,481.15 
6060+640.00  6.35  12.70  10.00  126.96  1,145,354.19 
6060+660.00  6.35  12.70  10.00  126.96  1,145,227.23 
6060+680.00  6.35  12.70  10.00  126.96  1,145,100.27 
6060+700.00  6.35  12.70  10.00  126.96  1,144,973.31 
6060+720.00  6.35  12.70  10.00  126.96  1,144,846.35 
6060+740.00  6.35  12.70  10.00  126.96  1,144,719.39 
6060+760.00  6.35  12.70  10.00  126.96  1,144,592.43 
6060+780.00  6.35  12.70  10.00  126.96  1,144,465.47 
6060+800.00  6.35  12.70  10.00  126.96  1,144,338.51 
6060+820.00  6.35  12.70  10.00  126.96  1,144,211.55 
6060+840.00  6.35  12.70  10.00  126.96  1,144,084.59 
6060+860.00  6.35  12.70  10.00  126.96  1,143,957.63 
6060+880.00  6.35  12.70  10.00  126.96  1,143,830.67 
6060+900.00  6.35  12.70  10.00  126.96  1,143,703.71 
6060+920.00  6.35  12.70  10.00  126.96  1,143,576.75 
6060+940.00  6.35  12.70  10.00  126.96  1,143,449.79 
6060+960.00  6.35  12.70  10.00  126.96  1,143,322.83 
6060+980.00  6.35  12.70  10.00  126.96  1,143,195.87 
6061+000.00  6.35  12.70  10.00  126.96  1,143,068.91 
6061+020.00  6.35  12.70  10.00  126.96  1,142,941.95 
6061+040.00  6.35  12.70  10.00  126.96  1,142,814.99 
6061+060.00  6.35  12.70  10.00  126.96  1,142,688.03 
6061+080.00  6.35  12.70  10.00  126.96  1,142,561.07 
6061+100.00  6.35  12.70  10.00  126.96  1,142,434.11 
6061+120.00  6.35  12.70  10.00  126.96  1,142,307.15 

452 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6061+140.00  6.35  12.70  10.00  126.96  1,142,180.19 


6061+160.00  6.35  12.70  10.00  126.96  1,142,053.23 
6061+180.00  6.35  12.70  10.00  126.96  1,141,926.27 
6061+200.00  6.35  12.70  10.00  126.96  1,141,799.31 
6061+220.00  6.35  12.70  10.00  126.96  1,141,672.35 
6061+240.00  6.35  12.70  10.00  126.96  1,141,545.39 
6061+260.00  6.35  12.70  10.00  126.96  1,141,418.43 
6061+280.00  6.35  12.70  10.00  126.96  1,141,291.47 
6061+300.00  6.35  12.70  10.00  126.96  1,141,164.51 
6061+320.00  6.35  12.70  10.00  126.96  1,141,037.55 
6061+340.00  6.35  12.70  10.00  126.96  1,140,910.59 
6061+360.00  6.35  12.70  10.00  126.96  1,140,783.63 
6061+380.00  6.35  12.70  10.00  126.96  1,140,656.67 
6061+400.00  6.35  12.70  10.00  126.96  1,140,529.71 
6061+420.00  6.35  12.70  10.00  126.96  1,140,402.75 
6061+440.00  6.35  12.70  10.00  126.96  1,140,275.79 
6061+460.00  6.35  12.70  10.00  126.96  1,140,148.83 
6061+480.00  6.35  12.70  10.00  126.96  1,140,021.87 
6061+500.00  6.35  12.70  10.00  126.96  1,139,894.91 
6061+520.00  6.35  12.70  10.00  126.96  1,139,767.95 
6061+540.00  6.35  12.70  10.00  126.96  1,139,640.99 
6061+560.00  6.35  12.70  10.00  126.96  1,139,514.03 
6061+580.00  6.35  12.70  10.00  126.96  1,139,387.07 
6061+600.00  6.35  12.70  10.00  126.96  1,139,260.11 
6061+620.00  6.35  12.70  10.00  126.96  1,139,133.15 
6061+640.00  6.35  12.70  10.00  126.96  1,139,006.19 
6061+660.00  6.35  12.70  10.00  126.96  1,138,879.23 
6061+680.00  6.35  12.70  10.00  126.96  1,138,752.27 
6061+700.00  6.35  12.70  10.00  126.96  1,138,625.31 
6061+720.00  6.35  12.70  10.00  126.96  1,138,498.35 
6061+740.00  6.35  12.70  10.00  126.96  1,138,371.39 
6061+760.00  6.35  12.70  10.00  126.96  1,138,244.43 
6061+780.00  6.35  12.70  10.00  126.96  1,138,117.47 
6061+800.00  6.35  12.70  10.00  126.96  1,137,990.51 
6061+820.00  6.35  12.70  10.00  126.96  1,137,863.55 
6061+840.00  6.35  12.70  10.00  126.96  1,137,736.59 
6061+860.00  6.35  12.70  10.00  126.96  1,137,609.63 
6061+880.00  6.35  12.70  10.00  126.96  1,137,482.67 
6061+900.00  6.35  12.70  10.00  126.96  1,137,355.71 
6061+920.00  6.35  12.70  10.00  126.96  1,137,228.75 
6061+940.00  6.35  12.70  10.00  126.96  1,137,101.79 
6061+960.00  6.35  12.70  10.00  126.96  1,136,974.83 
6061+980.00  6.35  12.70  10.00  126.96  1,136,847.87 
6062+000.00  6.35  12.70  10.00  126.96  1,136,720.91 
6062+020.00  6.35  12.70  10.00  126.96  1,136,593.95 
6062+040.00  6.35  12.70  10.00  126.96  1,136,466.99 
6062+060.00  6.35  12.70  10.00  126.96  1,136,340.03 
6062+080.00  6.35  12.70  10.00  126.96  1,136,213.07 
6062+100.00  6.35  12.70  10.00  126.96  1,136,086.11 
6062+120.00  6.35  12.70  10.00  126.96  1,135,959.15 
6062+140.00  6.35  12.70  10.00  126.96  1,135,832.19 

453 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6062+160.00  6.35  12.70  10.00  126.96  1,135,705.23 


6062+180.00  6.35  12.70  10.00  126.96  1,135,578.27 
6062+200.00  6.35  12.70  10.00  126.96  1,135,451.31 
6062+220.00  6.35  12.70  10.00  126.96  1,135,324.35 
6062+240.00  6.35  12.70  10.00  126.96  1,135,197.39 
6062+260.00  6.35  12.70  10.00  126.96  1,135,070.43 
6062+280.00  6.35  12.70  10.00  126.96  1,134,943.47 
6062+300.00  6.35  12.70  10.00  126.96  1,134,816.51 
6062+320.00  6.35  12.70  10.00  126.96  1,134,689.55 
6062+340.00  6.35  12.70  10.00  126.96  1,134,562.59 
6062+360.00  6.35  12.70  10.00  126.96  1,134,435.63 
6062+380.00  6.35  12.70  10.00  126.96  1,134,308.67 
6062+400.00  6.35  12.70  10.00  126.96  1,134,181.71 
6062+420.00  6.35  12.70  10.00  126.96  1,134,054.75 
6062+440.00  6.35  12.70  10.00  126.96  1,133,927.79 
6062+460.00  6.35  12.70  10.00  126.97  1,133,800.82 
6062+480.00  6.35  12.70  10.00  126.97  1,133,673.85 
6062+500.00  6.35  12.70  10.00  126.97  1,133,546.88 
6062+520.00  6.35  12.70  10.00  126.97  1,133,419.91 
6062+540.00  6.35  12.70  10.00  126.97  1,133,292.94 
6062+560.00  6.35  12.70  10.00  126.97  1,133,165.97 
6062+580.00  6.35  12.70  10.00  126.96  1,133,039.01 
6062+600.00  6.35  12.70  10.00  126.96  1,132,912.05 
6062+620.00  6.35  12.70  10.00  126.96  1,132,785.09 
6062+640.00  6.35  12.70  10.00  126.96  1,132,658.13 
6062+660.00  6.35  12.70  10.00  126.96  1,132,531.17 
6062+680.00  6.35  12.70  10.00  126.97  1,132,404.20 
6062+700.00  6.35  12.70  10.00  126.98  1,132,277.22 
6062+720.00  6.35  12.70  10.00  126.97  1,132,150.25 
6062+740.00  6.35  12.70  10.00  126.96  1,132,023.29 
6062+760.00  6.35  12.70  10.00  126.97  1,131,896.32 
6062+780.00  6.35  12.70  10.00  126.97  1,131,769.35 
6062+800.00  6.35  12.70  10.00  126.97  1,131,642.38 
6062+820.00  6.35  12.70  10.00  126.97  1,131,515.41 
6062+840.00  6.35  12.70  10.00  126.96  1,131,388.45 
6062+860.00  6.35  12.70  10.00  126.96  1,131,261.49 
6062+880.00  6.35  12.70  10.00  126.96  1,131,134.53 
6062+900.00  6.35  12.70  10.00  126.96  1,131,007.57 
6062+920.00  6.35  12.70  10.00  126.96  1,130,880.61 
6062+940.00  6.35  12.70  10.00  126.96  1,130,753.65 
6062+960.00  6.35  12.70  10.00  126.96  1,130,626.69 
6062+980.00  6.35  12.70  10.00  126.96  1,130,499.73 
6063+000.00  6.35  12.70  10.00  126.96  1,130,372.77 
6063+020.00  6.35  12.70  10.00  126.96  1,130,245.81 
6063+040.00  6.35  12.70  10.00  126.96  1,130,118.85 
6063+060.00  6.35  12.70  10.00  126.96  1,129,991.89 
6063+080.00  6.35  12.70  10.00  126.96  1,129,864.93 
6063+100.00  6.35  12.70  10.00  126.96  1,129,737.97 
6063+120.00  6.35  12.70  10.00  126.96  1,129,611.01 
6063+140.00  6.35  12.70  10.00  126.96  1,129,484.05 
6063+160.00  6.35  12.70  10.00  126.96  1,129,357.09 

454 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6063+180.00  6.35  12.70  10.00  126.96  1,129,230.13 


6063+200.00  6.35  12.70  10.00  126.96  1,129,103.17 
6063+220.00  6.35  12.70  10.00  126.96  1,128,976.21 
6063+240.00  6.35  12.70  10.00  126.96  1,128,849.25 
6063+260.00  6.35  12.70  10.00  126.96  1,128,722.29 
6063+280.00  6.35  12.70  10.00  126.96  1,128,595.33 
6063+300.00  6.35  12.70  10.00  126.96  1,128,468.37 
6063+320.00  6.35  12.70  10.00  126.96  1,128,341.41 
6063+340.00  6.35  12.70  10.00  126.96  1,128,214.45 
6063+360.00  6.35  12.70  10.00  126.96  1,128,087.49 
6063+380.00  6.35  12.70  10.00  126.96  1,127,960.53 
6063+400.00  6.35  12.70  10.00  126.96  1,127,833.57 
6063+420.00  6.35  12.70  10.00  126.96  1,127,706.61 
6063+440.00  6.35  12.70  10.00  126.96  1,127,579.65 
6063+460.00  6.35  12.70  10.00  126.96  1,127,452.69 
6063+480.00  6.35  12.70  10.00  126.96  1,127,325.73 
6063+500.00  6.35  12.70  10.00  126.96  1,127,198.77 
6063+520.00  6.35  12.70  10.00  126.96  1,127,071.81 
6063+540.00  6.35  12.70  10.00  126.96  1,126,944.85 
6063+560.00  6.35  12.70  10.00  126.96  1,126,817.89 
6063+580.00  6.35  12.70  10.00  126.96  1,126,690.93 
6063+600.00  6.35  12.70  10.00  126.96  1,126,563.97 
6063+620.00  6.35  12.70  10.00  126.96  1,126,437.01 
6063+640.00  6.35  12.70  10.00  126.96  1,126,310.05 
6063+660.00  6.35  12.70  10.00  126.96  1,126,183.09 
6063+680.00  6.35  12.70  10.00  126.96  1,126,056.13 
6063+700.00  6.35  12.70  10.00  126.96  1,125,929.17 
6063+720.00  6.35  12.70  10.00  126.96  1,125,802.21 
6063+740.00  6.35  12.70  10.00  126.96  1,125,675.25 
6063+760.00  6.35  12.70  10.00  126.96  1,125,548.29 
6063+780.00  6.35  12.70  10.00  126.96  1,125,421.33 
6063+800.00  6.35  12.70  10.00  126.96  1,125,294.37 
6063+820.00  6.35  12.70  10.00  126.96  1,125,167.41 
6063+840.00  6.35  12.70  10.00  126.96  1,125,040.45 
6063+860.00  6.35  12.70  10.00  126.96  1,124,913.49 
6063+880.00  6.35  12.70  10.00  126.96  1,124,786.53 
6063+900.00  6.35  12.70  10.00  126.96  1,124,659.57 
6063+920.00  6.35  12.70  10.00  126.96  1,124,532.61 
6063+940.00  6.35  12.70  10.00  126.96  1,124,405.65 
6063+960.00  6.35  12.70  10.00  126.96  1,124,278.69 
6063+980.00  6.35  12.70  10.00  126.96  1,124,151.73 
6064+000.00  6.35  12.70  10.00  126.96  1,124,024.77 
6064+020.00  6.35  12.70  10.00  126.96  1,123,897.81 
6064+040.00  6.35  12.70  10.00  126.96  1,123,770.85 
6064+060.00  6.35  12.70  10.00  126.96  1,123,643.89 
6064+080.00  6.35  12.70  10.00  126.96  1,123,516.93 
6064+100.00  6.35  12.70  10.00  126.96  1,123,389.97 
6064+120.00  6.35  12.70  10.00  126.96  1,123,263.01 
6064+140.00  6.35  12.70  10.00  126.97  1,123,136.04 
6064+160.00  6.35  12.70  10.00  126.98  1,123,009.06 
6064+180.00  6.35  12.70  10.00  126.98  1,122,882.08 

455 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6064+200.00  6.35  12.70  10.00  126.97  1,122,755.11 


6064+220.00  6.35  12.70  10.00  126.96  1,122,628.15 
6064+240.00  6.35  12.70  10.00  126.96  1,122,501.19 
6064+260.00  6.35  12.70  10.00  126.97  1,122,374.22 
6064+280.00  6.35  12.70  10.00  126.97  1,122,247.25 
6064+300.00  6.35  12.70  10.00  126.96  1,122,120.29 
6064+320.00  6.35  12.70  10.00  126.96  1,121,993.33 
6064+340.00  6.35  12.70  10.00  126.96  1,121,866.37 
6064+360.00  6.35  12.70  10.00  126.97  1,121,739.40 
6064+380.00  6.35  12.70  10.00  126.97  1,121,612.43 
6064+400.00  6.35  12.70  10.00  126.96  1,121,485.47 
6064+420.00  6.35  12.70  10.00  126.96  1,121,358.51 
6064+440.00  6.35  12.70  10.00  126.96  1,121,231.55 
6064+460.00  6.35  12.70  10.00  126.96  1,121,104.59 
6064+480.00  6.35  12.70  10.00  126.97  1,120,977.62 
6064+500.00  6.35  12.70  10.00  126.97  1,120,850.65 
6064+520.00  6.35  12.70  10.00  126.96  1,120,723.69 
6064+540.00  6.35  12.70  10.00  126.96  1,120,596.73 
6064+560.00  6.35  12.70  10.00  126.96  1,120,469.77 
6064+580.00  6.35  12.70  10.00  126.97  1,120,342.80 
6064+600.00  6.35  12.70  10.00  126.98  1,120,215.82 
6064+620.00  6.35  12.70  10.00  126.97  1,120,088.85 
6064+640.00  6.35  12.70  10.00  126.96  1,119,961.89 
6064+660.00  6.35  12.70  10.00  126.96  1,119,834.93 
6064+680.00  6.35  12.70  10.00  126.96  1,119,707.97 
6064+700.00  6.35  12.70  10.00  126.96  1,119,581.01 
6064+720.00  6.35  12.70  10.00  126.96  1,119,454.05 
6064+740.00  6.35  12.70  10.00  126.96  1,119,327.09 
6064+760.00  6.35  12.70  10.00  126.96  1,119,200.13 
6064+780.00  6.35  12.70  10.00  126.97  1,119,073.16 
6064+800.00  6.35  12.70  10.00  126.97  1,118,946.19 
6064+820.00  6.35  12.70  10.00  126.97  1,118,819.22 
6064+840.00  6.35  12.70  10.00  126.98  1,118,692.24 
6064+860.00  6.35  12.70  10.00  126.97  1,118,565.27 
6064+880.00  6.35  12.70  10.00  126.96  1,118,438.31 
6064+900.00  6.35  12.70  10.00  126.96  1,118,311.35 
6064+920.00  6.35  12.70  10.00  126.96  1,118,184.39 
6064+940.00  6.35  12.70  10.00  126.96  1,118,057.43 
6064+960.00  6.35  12.70  10.00  126.96  1,117,930.47 
6064+980.00  6.35  12.70  10.00  126.96  1,117,803.51 
6065+000.00  6.35  12.70  10.00  126.96  1,117,676.55 
6065+020.00  6.35  12.70  10.00  126.96  1,117,549.59 
6065+040.00  6.35  12.70  10.00  126.96  1,117,422.63 
6065+060.00  6.35  12.70  10.00  126.96  1,117,295.67 
6065+080.00  6.35  12.70  10.00  126.96  1,117,168.71 
6065+100.00  6.35  12.70  10.00  126.96  1,117,041.75 
6065+120.00  6.35  12.70  10.00  126.96  1,116,914.79 
6065+140.00  6.35  12.70  10.00  126.96  1,116,787.83 
6065+160.00  6.35  12.70  10.00  126.96  1,116,660.87 
6065+180.00  6.35  12.70  10.00  126.96  1,116,533.91 
6065+200.00  6.35  12.70  10.00  126.96  1,116,406.95 

456 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6065+220.00  6.35  12.70  10.00  126.96  1,116,279.99 


6065+240.00  6.35  12.70  10.00  126.96  1,116,153.03 
6065+260.00  6.35  12.70  10.00  126.96  1,116,026.07 
6065+280.00  6.35  12.70  10.00  126.96  1,115,899.11 
6065+300.00  6.35  12.70  10.00  126.96  1,115,772.15 
6065+320.00  6.35  12.70  10.00  126.96  1,115,645.19 
6065+340.00  6.35  12.70  10.00  126.96  1,115,518.23 
6065+360.00  6.35  12.70  10.00  126.96  1,115,391.27 
6065+380.00  6.35  12.70  10.00  126.96  1,115,264.31 
6065+400.00  6.35  12.70  10.00  126.96  1,115,137.35 
6065+420.00  6.35  12.70  10.00  126.96  1,115,010.39 
6065+440.00  6.35  12.70  10.00  126.96  1,114,883.43 
6065+460.00  6.35  12.70  10.00  126.96  1,114,756.47 
6065+480.00  6.35  12.70  10.00  126.96  1,114,629.51 
6065+500.00  6.35  12.70  10.00  126.96  1,114,502.55 
6065+520.00  6.35  12.70  10.00  126.96  1,114,375.59 
6065+540.00  6.35  12.70  10.00  126.96  1,114,248.63 
6065+560.00  6.35  12.70  10.00  126.96  1,114,121.67 
6065+560.00  6.35  12.70  0.00  0.00  1,114,121.67 
6065+580.00  6.35  12.70  10.00  126.97  1,113,994.70 
6065+600.00  6.35  12.70  10.00  126.98  1,113,867.72 
6065+620.00  6.35  12.70  10.00  126.98  1,113,740.74 
6065+640.00  6.35  12.70  10.00  126.97  1,113,613.77 
6065+660.00  6.35  12.70  10.00  126.97  1,113,486.80 
6065+680.00  6.35  12.70  10.00  126.98  1,113,359.82 
6065+700.00  6.35  12.70  10.00  126.97  1,113,232.85 
6065+710.00  6.35  12.70  5.00  63.48  1,113,169.37 
6065+710.00  6.35  12.70  0.00  0.00  1,113,169.37 
6065+720.00  6.35  12.70  5.00  63.48  1,113,105.89 
6065+740.00  6.35  12.70  10.00  126.96  1,112,978.93 
6065+760.00  6.35  12.70  10.00  126.97  1,112,851.96 
6065+780.00  6.35  12.70  10.00  126.97  1,112,724.99 
6065+800.00  6.35  12.70  10.00  126.96  1,112,598.03 
6065+820.00  6.35  12.70  10.00  126.96  1,112,471.07 
6065+840.00  6.35  12.70  10.00  126.96  1,112,344.11 
6065+860.00  6.35  12.70  10.00  126.96  1,112,217.15 
6065+880.00  6.35  12.70  10.00  126.96  1,112,090.19 
6065+900.00  6.35  12.70  10.00  126.95  1,111,963.24 
6065+920.00  6.35  12.70  10.00  126.96  1,111,836.28 
6065+940.00  6.35  12.70  10.00  126.97  1,111,709.31 
6065+960.00  6.35  12.70  10.00  126.96  1,111,582.35 
6065+980.00  6.35  12.70  10.00  126.97  1,111,455.38 
6066+000.00  6.35  12.70  10.00  126.98  1,111,328.40 
6066+020.00  6.35  12.70  10.00  126.98  1,111,201.42 
6066+040.00  6.35  12.70  10.00  126.98  1,111,074.44 
6066+060.00  6.35  12.70  10.00  126.98  1,110,947.46 
6066+080.00  6.35  12.70  10.00  126.98  1,110,820.48 
6066+100.00  6.35  12.70  10.00  126.98  1,110,693.50 
6066+120.00  6.35  12.70  10.00  126.98  1,110,566.52 
6066+140.00  6.35  12.70  10.00  126.98  1,110,439.54 
6066+160.00  6.35  12.70  10.00  126.98  1,110,312.56 

457 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6066+180.00  6.35  12.70  10.00  126.98  1,110,185.58 


6066+200.00  6.35  12.70  10.00  126.98  1,110,058.60 
6066+220.00  6.35  12.70  10.00  126.98  1,109,931.62 
6066+240.00  6.35  12.70  10.00  126.98  1,109,804.64 
6066+260.00  6.35  12.70  10.00  126.98  1,109,677.66 
6066+280.00  6.35  12.70  10.00  126.98  1,109,550.68 
6066+300.00  6.35  12.70  10.00  126.98  1,109,423.70 
6066+320.00  6.35  12.70  10.00  126.98  1,109,296.72 
6066+340.00  6.35  12.70  10.00  126.98  1,109,169.74 
6066+360.00  6.35  12.70  10.00  126.98  1,109,042.76 
6066+380.00  6.35  12.70  10.00  126.98  1,108,915.78 
6066+400.00  6.35  12.70  10.00  126.98  1,108,788.80 
6066+420.00  6.35  12.70  10.00  126.98  1,108,661.82 
6066+440.00  6.35  12.70  10.00  126.98  1,108,534.84 
6066+460.00  6.35  12.70  10.00  126.98  1,108,407.86 
6066+480.00  6.35  12.70  10.00  126.98  1,108,280.88 
6066+500.00  6.35  12.70  10.00  126.98  1,108,153.90 
6066+520.00  6.35  12.70  10.00  126.98  1,108,026.92 
6066+540.00  6.35  12.70  10.00  126.98  1,107,899.94 
6066+560.00  6.35  12.70  10.00  126.98  1,107,772.96 
6066+580.00  6.35  12.70  10.00  126.98  1,107,645.98 
6066+600.00  6.35  12.70  10.00  126.98  1,107,519.00 
6066+620.00  6.35  12.70  10.00  126.98  1,107,392.02 
6066+640.00  6.35  12.70  10.00  126.98  1,107,265.04 
6066+660.00  6.35  12.70  10.00  126.98  1,107,138.06 
6066+680.00  6.35  12.70  10.00  126.98  1,107,011.08 
6066+700.00  6.35  12.70  10.00  126.98  1,106,884.10 
6066+720.00  6.35  12.70  10.00  126.98  1,106,757.12 
6066+740.00  6.35  12.70  10.00  126.98  1,106,630.14 
6066+760.00  6.35  12.70  10.00  126.98  1,106,503.16 
6066+780.00  6.35  12.70  10.00  126.98  1,106,376.18 
6066+800.00  6.35  12.70  10.00  126.97  1,106,249.21 
6066+820.00  6.35  12.70  10.00  126.96  1,106,122.25 
6066+840.00  6.35  12.70  10.00  126.96  1,105,995.29 
6066+860.00  6.35  12.70  10.00  126.96  1,105,868.33 
6066+880.00  6.35  12.70  10.00  126.96  1,105,741.37 
6066+900.00  6.35  12.70  10.00  126.96  1,105,614.41 
6066+920.00  6.35  12.70  10.00  126.96  1,105,487.45 
6066+940.00  6.35  12.70  10.00  126.96  1,105,360.49 
6066+960.00  6.35  12.70  10.00  126.97  1,105,233.52 
6066+980.00  6.35  12.70  10.00  126.97  1,105,106.55 
6067+000.00  6.35  12.70  10.00  126.96  1,104,979.59 
 

6.1.3.  Cálculo de acarreos para sub‐balasto 
A continuación, se presentan los cálculos en las siguientes tablas del cálculo del acarreo del material 
para la construcción de la capa de sub‐balasto. 

458 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TABLA 36 CÁLCULO DE ACARREOS DE SUB‐BALASTO DEL TRAMO [ADMINISTRADOR] 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5000+000.00  2.81  2.81        1,300,000.00 


5000+020.00  2.81  5.61  10.00  56.10  1,299,943.90 
5000+040.00  2.81  5.61  10.00  56.10  1,299,887.80 
5000+060.00  2.81  5.61  10.00  56.10  1,299,831.70 
5000+080.00  2.81  5.61  10.00  56.10  1,299,775.60 
5000+100.00  2.81  5.61  10.00  56.10  1,299,719.50 
5000+120.00  2.81  5.61  10.00  56.10  1,299,663.40 
5000+140.00  2.81  5.61  10.00  56.10  1,299,607.30 
5000+160.00  2.81  5.61  10.00  56.10  1,299,551.20 
5000+180.00  2.81  5.61  10.00  56.10  1,299,495.10 
5000+200.00  2.81  5.61  10.00  56.10  1,299,439.00 
5000+220.00  2.81  5.61  10.00  56.10  1,299,382.90 
5000+240.00  2.81  5.61  10.00  56.10  1,299,326.80 
5000+260.00  2.81  5.61  10.00  56.11  1,299,270.69 
5000+280.00  2.81  5.61  10.00  56.11  1,299,214.58 
5000+300.00  2.81  5.61  10.00  56.11  1,299,158.47 
5000+320.00  2.81  5.61  10.00  56.12  1,299,102.35 
5000+340.00  2.81  5.61  10.00  56.11  1,299,046.24 
5000+360.00  2.81  5.61  10.00  56.10  1,298,990.14 
5000+380.00  2.81  5.61  10.00  56.11  1,298,934.03 
5000+400.00  2.81  5.61  10.00  56.12  1,298,877.91 
5000+420.00  2.81  5.61  10.00  56.11  1,298,821.80 
5000+440.00  2.81  5.61  10.00  56.11  1,298,765.69 
5000+440.00  2.81  5.61  0.00  0.00  1,298,765.69 
5000+460.00  2.81  5.61  10.00  56.12  1,298,709.57 
5000+480.00  2.81  5.61  10.00  56.12  1,298,653.45 
5000+500.00  2.81  5.61  10.00  56.12  1,298,597.33 
5000+520.00  2.81  5.61  10.00  56.11  1,298,541.22 
5000+540.00  2.81  5.61  10.00  56.11  1,298,485.11 
5000+560.00  2.81  5.61  10.00  56.12  1,298,428.99 
5000+580.00  2.81  5.61  10.00  56.12  1,298,372.87 
5000+600.00  2.81  5.61  10.00  56.11  1,298,316.76 
5000+620.00  2.81  5.61  10.00  56.11  1,298,260.65 
5000+640.00  2.81  5.61  10.00  56.11  1,298,204.54 
5000+660.00  2.81  5.61  10.00  56.11  1,298,148.43 
5000+680.00  2.81  5.61  10.00  56.11  1,298,092.32 
5000+700.00  2.81  5.61  10.00  56.11  1,298,036.21 
5000+720.00  2.81  5.61  10.00  56.12  1,297,980.09 
5000+740.00  2.81  5.61  10.00  56.12  1,297,923.97 
5000+760.00  2.81  5.61  10.00  56.12  1,297,867.85 
5000+780.00  2.81  5.61  10.00  56.12  1,297,811.73 
5000+800.00  2.81  5.61  10.00  56.12  1,297,755.61 
5000+820.00  2.81  5.61  10.00  56.12  1,297,699.49 

459 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5000+840.00  2.81  5.61  10.00  56.12  1,297,643.37 


5000+860.00  2.81  5.61  10.00  56.12  1,297,587.25 
5000+880.00  2.81  5.61  10.00  56.12  1,297,531.13 
5000+900.00  2.81  5.61  10.00  56.11  1,297,475.02 
5000+920.00  2.81  5.61  10.00  56.11  1,297,418.91 
5000+940.00  2.81  5.61  10.00  56.11  1,297,362.80 
5000+960.00  2.81  5.61  10.00  56.10  1,297,306.70 
5000+960.00  2.81  5.61  0.00  0.00  1,297,306.70 
5000+980.00  2.81  5.61  10.00  56.11  1,297,250.59 
5001+000.00  2.81  5.61  10.00  56.11  1,297,194.48 
5001+020.00  2.81  5.61  10.00  56.10  1,297,138.38 
5001+040.00  2.81  5.61  10.00  56.11  1,297,082.27 
5001+060.00  2.81  5.61  10.00  56.11  1,297,026.16 
5001+080.00  2.81  5.61  10.00  56.10  1,296,970.06 
5001+100.00  2.81  5.61  10.00  56.10  1,296,913.96 
5001+120.00  2.81  5.61  10.00  56.11  1,296,857.85 
5001+140.00  2.81  5.61  10.00  56.11  1,296,801.74 
5001+160.00  2.81  5.61  10.00  56.10  1,296,745.64 
5001+180.00  2.81  5.61  10.00  56.10  1,296,689.54 
5001+200.00  2.81  5.61  10.00  56.10  1,296,633.44 
5001+220.00  2.81  5.61  10.00  56.10  1,296,577.34 
5001+240.00  2.81  5.61  10.00  56.10  1,296,521.24 
5001+260.00  2.81  5.61  10.00  56.10  1,296,465.14 
5001+280.00  2.81  5.61  10.00  56.10  1,296,409.04 
5001+300.00  2.81  5.61  10.00  56.10  1,296,352.94 
5001+320.00  2.81  5.61  10.00  56.10  1,296,296.84 
5001+340.00  2.81  5.61  10.00  56.11  1,296,240.73 
5001+360.00  2.81  5.61  10.00  56.12  1,296,184.61 
5001+380.00  2.81  5.61  10.00  56.12  1,296,128.49 
5001+400.00  2.81  5.61  10.00  56.12  1,296,072.37 
5001+420.00  2.81  5.61  10.00  56.12  1,296,016.25 
5001+440.00  2.81  5.61  10.00  56.12  1,295,960.13 
5001+460.00  2.81  5.61  10.00  56.12  1,295,904.01 
5001+480.00  2.81  5.61  10.00  56.12  1,295,847.89 
5001+500.00  2.81  5.61  10.00  56.12  1,295,791.77 
5001+520.00  2.81  5.61  10.00  56.12  1,295,735.65 
5001+540.00  2.81  5.61  10.00  56.12  1,295,679.53 
5001+560.00  2.81  5.61  10.00  56.12  1,295,623.41 
5001+580.00  2.81  5.61  10.00  56.12  1,295,567.29 
5001+600.00  2.81  5.61  10.00  56.12  1,295,511.17 
5001+620.00  2.81  5.61  10.00  56.12  1,295,455.05 
5001+640.00  2.81  5.61  10.00  56.12  1,295,398.93 
5001+660.00  2.81  5.61  10.00  56.12  1,295,342.81 
5001+680.00  2.81  5.61  10.00  56.12  1,295,286.69 
5001+700.00  2.81  5.61  10.00  56.12  1,295,230.57 
5001+720.00  2.81  5.61  10.00  56.12  1,295,174.45 
5001+740.00  2.81  5.61  10.00  56.12  1,295,118.33 
5001+760.00  2.81  5.61  10.00  56.12  1,295,062.21 
5001+780.00  2.81  5.61  10.00  56.12  1,295,006.09 
5001+800.00  2.81  5.61  10.00  56.12  1,294,949.97 
5001+820.00  2.81  5.61  10.00  56.12  1,294,893.85 

460 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5001+840.00  2.81  5.61  10.00  56.12  1,294,837.73 


5001+860.00  2.81  5.61  10.00  56.12  1,294,781.61 
5001+880.00  2.81  5.61  10.00  56.12  1,294,725.49 
5001+900.00  2.81  5.61  10.00  56.12  1,294,669.37 
5001+920.00  2.81  5.61  10.00  56.12  1,294,613.25 
5001+940.00  2.81  5.61  10.00  56.12  1,294,557.13 
5001+960.00  2.81  5.61  10.00  56.12  1,294,501.01 
5001+980.00  2.81  5.61  10.00  56.12  1,294,444.89 
5002+000.00  2.81  5.61  10.00  56.12  1,294,388.77 
5002+020.00  2.81  5.61  10.00  56.12  1,294,332.65 
5002+040.00  2.81  5.61  10.00  56.12  1,294,276.53 
5002+060.00  2.81  5.61  10.00  56.12  1,294,220.41 
5002+080.00  2.81  5.61  10.00  56.12  1,294,164.29 
5002+100.00  2.81  5.61  10.00  56.12  1,294,108.17 
5002+120.00  2.81  5.61  10.00  56.12  1,294,052.05 
5002+140.00  2.81  5.61  10.00  56.12  1,293,995.93 
5002+160.00  2.81  5.61  10.00  56.12  1,293,939.81 
5002+180.00  2.81  5.61  10.00  56.12  1,293,883.69 
5002+200.00  2.81  5.61  10.00  56.12  1,293,827.57 
5002+220.00  2.81  5.61  10.00  56.12  1,293,771.45 
5002+240.00  2.81  5.61  10.00  56.12  1,293,715.33 
5002+260.00  2.81  5.61  10.00  56.12  1,293,659.21 
5002+280.00  2.81  5.61  10.00  56.12  1,293,603.09 
5002+300.00  2.81  5.61  10.00  56.12  1,293,546.97 
5002+320.00  2.81  5.61  10.00  56.12  1,293,490.85 
5002+340.00  2.81  5.61  10.00  56.12  1,293,434.73 
5002+360.00  2.81  5.61  10.00  56.12  1,293,378.61 
5002+380.00  2.81  5.61  10.00  56.12  1,293,322.49 
5002+400.00  2.81  5.61  10.00  56.12  1,293,266.37 
5002+420.00  2.81  5.61  10.00  56.12  1,293,210.25 
5002+440.00  2.81  5.61  10.00  56.12  1,293,154.13 
5002+460.00  2.81  5.61  10.00  56.12  1,293,098.01 
5002+480.00  2.81  5.61  10.00  56.12  1,293,041.89 
5002+500.00  2.81  5.61  10.00  56.12  1,292,985.77 
5002+520.00  2.81  5.61  10.00  56.12  1,292,929.65 
5002+540.00  2.81  5.61  10.00  56.12  1,292,873.53 
5002+560.00  2.81  5.61  10.00  56.12  1,292,817.41 
5002+580.00  2.81  5.61  10.00  56.12  1,292,761.29 
5002+600.00  2.81  5.61  10.00  56.12  1,292,705.17 
5002+620.00  2.81  5.61  10.00  56.12  1,292,649.05 
5002+640.00  2.81  5.61  10.00  56.12  1,292,592.93 
5002+660.00  2.81  5.61  10.00  56.12  1,292,536.81 
5002+680.00  2.81  5.61  10.00  56.12  1,292,480.69 
5002+700.00  2.81  5.61  10.00  56.12  1,292,424.57 
5002+720.00  2.81  5.61  10.00  56.12  1,292,368.45 
5002+740.00  2.81  5.61  10.00  56.12  1,292,312.33 
5002+745.00  2.81  5.61  2.50  14.03  1,292,298.30 
5002+745.00  2.81  5.61  0.00  0.00  1,292,298.30 
5002+760.00  2.81  5.61  7.50  42.09  1,292,256.21 
5002+780.00  2.81  5.61  10.00  56.12  1,292,200.09 
5002+800.00  2.81  5.61  10.00  56.12  1,292,143.97 

461 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5002+820.00  2.81  5.61  10.00  56.12  1,292,087.85 


5002+840.00  2.81  5.61  10.00  56.12  1,292,031.73 
5002+860.00  2.81  5.61  10.00  56.12  1,291,975.61 
5002+880.00  2.81  5.61  10.00  56.12  1,291,919.49 
5002+900.00  2.81  5.61  10.00  56.12  1,291,863.37 
5002+920.00  2.81  5.61  10.00  56.12  1,291,807.25 
5002+940.00  2.81  5.61  10.00  56.12  1,291,751.13 
5002+960.00  2.81  5.61  10.00  56.12  1,291,695.01 
5002+980.00  2.81  5.61  10.00  56.12  1,291,638.89 
5003+000.00  2.81  5.61  10.00  56.12  1,291,582.77 
5003+020.00  2.81  5.61  10.00  56.12  1,291,526.65 
5003+040.00  2.81  5.61  10.00  56.12  1,291,470.53 
5003+060.00  2.81  5.61  10.00  56.12  1,291,414.41 
5003+080.00  2.81  5.61  10.00  56.12  1,291,358.29 
5003+100.00  2.81  5.61  10.00  56.12  1,291,302.17 
5003+120.00  2.81  5.61  10.00  56.12  1,291,246.05 
5003+140.00  2.81  5.61  10.00  56.12  1,291,189.93 
5003+160.00  2.81  5.61  10.00  56.12  1,291,133.81 
5003+180.00  2.81  5.61  10.00  56.12  1,291,077.69 
5003+200.00  2.81  5.61  10.00  56.11  1,291,021.58 
5003+220.00  2.81  5.61  10.00  56.10  1,290,965.48 
5003+240.00  2.81  5.61  10.00  56.10  1,290,909.38 
5003+260.00  2.81  5.61  10.00  56.10  1,290,853.28 
5003+280.00  2.81  5.61  10.00  56.10  1,290,797.18 
5003+300.00  2.81  5.61  10.00  56.10  1,290,741.08 
5003+320.00  2.81  5.61  10.00  56.10  1,290,684.98 
5003+340.00  2.81  5.61  10.00  56.10  1,290,628.88 
5003+360.00  2.81  5.61  10.00  56.11  1,290,572.77 
5003+380.00  2.81  5.61  10.00  56.12  1,290,516.65 
5003+400.00  2.81  5.61  10.00  56.11  1,290,460.54 
5003+420.00  2.81  5.61  10.00  56.10  1,290,404.44 
5003+440.00  2.81  5.61  10.00  56.10  1,290,348.34 
5003+460.00  2.81  5.61  10.00  56.10  1,290,292.24 
5003+480.00  2.81  5.61  10.00  56.10  1,290,236.14 
5003+490.00  2.81  5.61  5.00  28.05  1,290,208.09 
5003+490.00  2.81  5.61  0.00  0.00  1,290,208.09 
5003+500.00  2.81  5.61  5.00  28.06  1,290,180.03 
5003+520.00  2.81  5.61  10.00  56.12  1,290,123.91 
5003+540.00  2.81  5.61  10.00  56.12  1,290,067.79 
5003+560.00  2.81  5.61  10.00  56.12  1,290,011.67 
5003+580.00  2.81  5.61  10.00  56.12  1,289,955.55 
5003+600.00  2.81  5.61  10.00  56.11  1,289,899.44 
5003+620.00  2.81  5.61  10.00  56.10  1,289,843.34 
5003+640.00  2.81  5.61  10.00  56.10  1,289,787.24 
5003+660.00  2.81  5.61  10.00  56.10  1,289,731.14 
5003+680.00  2.81  5.61  10.00  56.10  1,289,675.04 
5003+700.00  2.81  5.61  10.00  56.11  1,289,618.93 
5003+720.00  2.81  5.61  10.00  56.11  1,289,562.82 
5003+740.00  2.81  5.61  10.00  56.10  1,289,506.72 
5003+760.00  2.81  5.61  10.00  56.11  1,289,450.61 
5003+780.00  2.81  5.61  10.00  56.11  1,289,394.50 

462 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5003+800.00  2.81  5.61  10.00  56.11  1,289,338.39 


5003+820.00  2.81  5.61  10.00  56.11  1,289,282.28 
5003+840.00  2.81  5.61  10.00  56.10  1,289,226.18 
5003+860.00  2.81  5.61  10.00  56.11  1,289,170.07 
5003+880.00  2.81  5.61  10.00  56.12  1,289,113.95 
5003+900.00  2.81  5.61  10.00  56.11  1,289,057.84 
5003+920.00  2.81  5.61  10.00  56.10  1,289,001.74 
5003+940.00  2.81  5.61  10.00  56.11  1,288,945.63 
5003+960.00  2.81  5.61  10.00  56.11  1,288,889.52 
5003+980.00  2.81  5.61  10.00  56.11  1,288,833.41 
5004+000.00  2.81  5.61  10.00  56.12  1,288,777.29 
5004+020.00  2.81  5.61  10.00  56.12  1,288,721.17 
5004+040.00  2.81  5.61  10.00  56.12  1,288,665.05 
5004+060.00  2.81  5.61  10.00  56.12  1,288,608.93 
5004+080.00  2.81  5.61  10.00  56.12  1,288,552.81 
5004+100.00  2.81  5.61  10.00  56.12  1,288,496.69 
5004+120.00  2.81  5.61  10.00  56.12  1,288,440.57 
5004+140.00  2.81  5.61  10.00  56.12  1,288,384.45 
5004+160.00  2.81  5.61  10.00  56.12  1,288,328.33 
5004+180.00  2.81  5.61  10.00  56.12  1,288,272.21 
5004+200.00  2.81  5.61  10.00  56.12  1,288,216.09 
5004+220.00  2.81  5.61  10.00  56.12  1,288,159.97 
5004+240.00  2.81  5.61  10.00  56.12  1,288,103.85 
5004+260.00  2.81  5.61  10.00  56.12  1,288,047.73 
5004+280.00  2.81  5.61  10.00  56.12  1,287,991.61 
5004+300.00  2.81  5.61  10.00  56.12  1,287,935.49 
5004+310.00  2.81  5.61  5.00  28.06  1,287,907.43 
5004+310.00  2.81  5.61  0.00  0.00  1,287,907.43 
5004+320.00  2.81  5.61  5.00  28.06  1,287,879.37 
5004+340.00  2.81  5.61  10.00  56.12  1,287,823.25 
5004+360.00  2.81  5.61  10.00  56.12  1,287,767.13 
5004+380.00  2.81  5.61  10.00  56.12  1,287,711.01 
5004+400.00  2.81  5.61  10.00  56.12  1,287,654.89 
5004+420.00  2.81  5.61  10.00  56.12  1,287,598.77 
5004+440.00  2.81  5.61  10.00  56.12  1,287,542.65 
5004+460.00  2.81  5.61  10.00  56.12  1,287,486.53 
5004+480.00  2.81  5.61  10.00  56.12  1,287,430.41 
5004+490.00  2.81  5.61  5.00  28.06  1,287,402.35 
5004+490.00  2.81  5.61  0.00  0.00  1,287,402.35 
5004+500.00  2.81  5.61  5.00  28.06  1,287,374.29 
5004+520.00  2.81  5.61  10.00  56.12  1,287,318.17 
5004+540.00  2.81  5.61  10.00  56.12  1,287,262.05 
5004+560.00  2.81  5.61  10.00  56.12  1,287,205.93 
5004+580.00  2.81  5.61  10.00  56.12  1,287,149.81 
5004+600.00  2.81  5.61  10.00  56.12  1,287,093.69 
5004+620.00  2.81  5.61  10.00  56.12  1,287,037.57 
5004+640.00  2.81  5.61  10.00  56.12  1,286,981.45 
5004+660.00  2.81  5.61  10.00  56.12  1,286,925.33 
5004+680.00  2.81  5.61  10.00  56.12  1,286,869.21 
5004+700.00  2.81  5.61  10.00  56.12  1,286,813.09 
5004+720.00  2.81  5.61  10.00  56.12  1,286,756.97 

463 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5004+740.00  2.81  5.61  10.00  56.12  1,286,700.85 


5004+760.00  2.81  5.61  10.00  56.12  1,286,644.73 
5004+780.00  2.81  5.61  10.00  56.12  1,286,588.61 
5004+800.00  2.81  5.61  10.00  56.12  1,286,532.49 
5004+800.00  2.81  5.61  0.00  0.00  1,286,532.49 
5004+820.00  2.81  5.61  10.00  56.12  1,286,476.37 
5004+840.00  2.81  5.61  10.00  56.12  1,286,420.25 
5004+860.00  2.81  5.61  10.00  56.12  1,286,364.13 
5004+880.00  2.81  5.61  10.00  56.12  1,286,308.01 
5004+900.00  2.81  5.61  10.00  56.12  1,286,251.89 
5004+920.00  2.81  5.61  10.00  56.12  1,286,195.77 
5004+940.00  2.81  5.61  10.00  56.12  1,286,139.65 
5004+960.00  2.81  5.61  10.00  56.12  1,286,083.53 
5004+980.00  2.81  5.61  10.00  56.12  1,286,027.41 
5004+980.00  2.81  5.61  0.00  0.00  1,286,027.41 
5005+000.00  2.81  5.61  10.00  56.12  1,285,971.29 
5005+020.00  2.81  5.61  10.00  56.12  1,285,915.17 
5005+040.00  2.81  5.61  10.00  56.12  1,285,859.05 
5005+060.00  2.81  5.61  10.00  56.12  1,285,802.93 
5005+080.00  2.81  5.61  10.00  56.12  1,285,746.81 
5005+100.00  2.81  5.61  10.00  56.12  1,285,690.69 
5005+120.00  2.81  5.61  10.00  56.12  1,285,634.57 
5005+140.00  2.81  5.61  10.00  56.12  1,285,578.45 
5005+160.00  2.81  5.61  10.00  56.12  1,285,522.33 
5005+180.00  2.81  5.61  10.00  56.12  1,285,466.21 
5005+200.00  2.81  5.61  10.00  56.12  1,285,410.09 
5005+220.00  2.81  5.61  10.00  56.12  1,285,353.97 
5005+240.00  2.81  5.61  10.00  56.12  1,285,297.85 
5005+260.00  2.81  5.61  10.00  56.12  1,285,241.73 
5005+280.00  2.81  5.61  10.00  56.12  1,285,185.61 
5005+300.00  2.81  5.61  10.00  56.12  1,285,129.49 
5005+320.00  2.81  5.61  10.00  56.12  1,285,073.37 
5005+340.00  2.81  5.61  10.00  56.12  1,285,017.25 
5005+360.00  2.81  5.61  10.00  56.11  1,284,961.14 
5005+380.00  2.81  5.61  10.00  56.11  1,284,905.03 
5005+400.00  2.81  5.61  10.00  56.12  1,284,848.91 
5005+420.00  2.81  5.61  10.00  56.11  1,284,792.80 
5005+440.00  2.81  5.61  10.00  56.11  1,284,736.69 
5005+460.00  2.81  5.61  10.00  56.11  1,284,680.58 
5005+480.00  2.81  5.61  10.00  56.10  1,284,624.48 
5005+500.00  2.81  5.61  10.00  56.11  1,284,568.37 
5005+520.00  2.81  5.61  10.00  56.11  1,284,512.26 
5005+540.00  2.81  5.61  10.00  56.10  1,284,456.16 
5005+560.00  2.81  5.61  10.00  56.10  1,284,400.06 
5005+580.00  2.81  5.61  10.00  56.11  1,284,343.95 
5005+600.00  2.81  5.61  10.00  56.11  1,284,287.84 
5005+620.00  2.81  5.61  10.00  56.10  1,284,231.74 
5005+640.00  2.81  5.61  10.00  56.10  1,284,175.64 
5005+660.00  2.81  5.61  10.00  56.11  1,284,119.53 
5005+680.00  2.81  5.61  10.00  56.12  1,284,063.41 
5005+680.00  2.81  5.61  0.00  0.00  1,284,063.41 

464 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5005+700.00  2.81  5.61  10.00  56.11  1,284,007.30 


5005+720.00  2.81  5.61  10.00  56.11  1,283,951.19 
5005+740.00  2.81  5.61  10.00  56.11  1,283,895.08 
5005+760.00  2.81  5.61  10.00  56.10  1,283,838.98 
5005+780.00  2.81  5.61  10.00  56.10  1,283,782.88 
5005+800.00  2.81  5.61  10.00  56.11  1,283,726.77 
5005+820.00  2.81  5.61  10.00  56.12  1,283,670.65 
5005+840.00  2.81  5.61  10.00  56.12  1,283,614.53 
5005+860.00  2.81  5.61  10.00  56.12  1,283,558.41 
5005+880.00  2.81  5.61  10.00  56.12  1,283,502.29 
5005+890.00  2.81  5.61  5.00  28.06  1,283,474.23 
5005+890.00  2.81  5.61  0.00  0.00  1,283,474.23 
5005+900.00  2.81  5.61  5.00  28.06  1,283,446.17 
5005+920.00  2.81  5.61  10.00  56.12  1,283,390.05 
5005+940.00  2.81  5.61  10.00  56.12  1,283,333.93 
5005+960.00  2.81  5.61  10.00  56.12  1,283,277.81 
5005+980.00  2.81  5.61  10.00  56.12  1,283,221.69 
5006+000.00  2.81  5.61  10.00  56.12  1,283,165.57 
5006+020.00  2.81  5.61  10.00  56.12  1,283,109.45 
5006+040.00  2.81  5.61  10.00  56.12  1,283,053.33 
5006+060.00  2.81  5.61  10.00  56.12  1,282,997.21 
5006+080.00  2.81  5.61  10.00  56.12  1,282,941.09 
5006+100.00  2.81  5.61  10.00  56.12  1,282,884.97 
5006+120.00  2.81  5.61  10.00  56.12  1,282,828.85 
5006+140.00  2.81  5.61  10.00  56.12  1,282,772.73 
5006+160.00  2.81  5.61  10.00  56.12  1,282,716.61 
5006+180.00  2.81  5.61  10.00  56.12  1,282,660.49 
5006+200.00  2.81  5.61  10.00  56.12  1,282,604.37 
5006+220.00  2.81  5.61  10.00  56.12  1,282,548.25 
5006+240.00  2.81  5.61  10.00  56.12  1,282,492.13 
5006+260.00  2.81  5.61  10.00  56.12  1,282,436.01 
5006+280.00  2.81  5.61  10.00  56.12  1,282,379.89 
5006+300.00  2.81  5.61  10.00  56.12  1,282,323.77 
5006+310.00  2.81  5.61  5.00  28.06  1,282,295.71 
5006+310.00  2.81  5.61  0.00  0.00  1,282,295.71 
5006+320.00  2.81  5.61  5.00  28.06  1,282,267.65 
5006+340.00  2.81  5.61  10.00  56.12  1,282,211.53 
5006+360.00  2.81  5.61  10.00  56.12  1,282,155.41 
5006+380.00  2.81  5.61  10.00  56.12  1,282,099.29 
5006+400.00  2.81  5.61  10.00  56.12  1,282,043.17 
5006+420.00  2.81  5.61  10.00  56.12  1,281,987.05 
5006+440.00  2.81  5.61  10.00  56.12  1,281,930.93 
5006+460.00  2.81  5.61  10.00  56.12  1,281,874.81 
5006+480.00  2.81  5.61  10.00  56.12  1,281,818.69 
5006+500.00  2.81  5.61  10.00  56.12  1,281,762.57 
5006+520.00  2.81  5.61  10.00  56.12  1,281,706.45 
5006+540.00  2.81  5.61  10.00  56.12  1,281,650.33 
5006+560.00  2.81  5.61  10.00  56.12  1,281,594.21 
5006+580.00  2.81  5.61  10.00  56.12  1,281,538.09 
5006+600.00  2.81  5.61  10.00  56.12  1,281,481.97 
5006+620.00  2.81  5.61  10.00  56.12  1,281,425.85 

465 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5006+640.00  2.81  5.61  10.00  56.12  1,281,369.73 


5006+660.00  2.81  5.61  10.00  56.12  1,281,313.61 
5006+680.00  2.81  5.61  10.00  56.12  1,281,257.49 
5006+700.00  2.81  5.61  10.00  56.12  1,281,201.37 
5006+720.00  2.81  5.61  10.00  56.12  1,281,145.25 
5006+740.00  2.81  5.61  10.00  56.12  1,281,089.13 
5006+760.00  2.81  5.61  10.00  56.12  1,281,033.01 
5006+780.00  2.81  5.61  10.00  56.12  1,280,976.89 
5006+790.00  2.81  5.61  5.00  28.06  1,280,948.83 
5006+800.00  2.87  5.67  5.00  28.37  1,280,920.46 
5006+810.00  2.93  5.80  5.00  29.00  1,280,891.46 
5006+820.00  2.94  5.88  5.00  29.38  1,280,862.08 
5006+830.00  2.98  5.93  5.00  29.63  1,280,832.45 
5006+840.00  3.04  6.03  5.00  30.13  1,280,802.32 
5006+850.00  3.13  6.18  5.00  30.88  1,280,771.44 
5006+860.00  3.24  6.38  5.00  31.88  1,280,739.56 
5006+870.00  3.38  6.63  5.00  33.13  1,280,706.43 
5006+880.00  3.53  6.91  5.00  34.57  1,280,671.86 
5006+890.00  3.68  7.21  5.00  36.07  1,280,635.79 
5006+900.00  3.83  7.51  5.00  37.57  1,280,598.22 
5006+910.00  3.98  7.81  5.00  39.07  1,280,559.15 
5006+920.00  4.12  8.10  5.00  40.51  1,280,518.65 
5006+930.00  4.23  8.35  5.00  41.76  1,280,476.89 
5006+940.00  4.32  8.55  5.00  42.76  1,280,434.14 
5006+950.00  4.38  8.70  5.00  43.51  1,280,390.63 
5006+960.00  4.42  8.80  5.00  44.01  1,280,346.63 
5006+970.00  4.43  8.85  5.00  44.26  1,280,302.37 
5006+980.00  4.43  8.86  5.00  44.32  1,280,258.05 
5007+000.00  4.43  8.86  10.00  88.64  1,280,169.41 
5007+020.00  4.43  8.86  10.00  88.64  1,280,080.77 
5007+040.00  4.43  8.86  10.00  88.64  1,279,992.13 
5007+060.00  4.43  8.86  10.00  88.64  1,279,903.49 
5007+080.00  4.43  8.86  10.00  88.64  1,279,814.85 
5007+100.00  4.43  8.86  10.00  88.64  1,279,726.21 
5007+120.00  4.43  8.86  10.00  88.64  1,279,637.57 
5007+140.00  4.43  8.86  10.00  88.64  1,279,548.93 
5007+160.00  4.43  8.86  10.00  88.64  1,279,460.29 
5007+180.00  4.43  8.86  10.00  88.64  1,279,371.65 
5007+180.00  4.43  8.86  0.00  0.00  1,279,371.65 
5007+200.00  4.43  8.86  10.00  88.64  1,279,283.01 
5007+220.00  4.43  8.86  10.00  88.64  1,279,194.37 
5007+240.00  4.43  8.86  10.00  88.64  1,279,105.73 
5007+260.00  4.43  8.86  10.00  88.64  1,279,017.09 
5007+280.00  4.43  8.86  10.00  88.64  1,278,928.45 
5007+300.00  4.43  8.86  10.00  88.64  1,278,839.81 
5007+320.00  4.43  8.86  10.00  88.64  1,278,751.17 
5007+340.00  4.43  8.86  10.00  88.64  1,278,662.53 
5007+360.00  4.43  8.86  10.00  88.64  1,278,573.89 
5007+360.00  4.43  8.86  0.00  0.00  1,278,573.89 
5007+380.00  4.43  8.86  10.00  88.64  1,278,485.25 
5007+400.00  4.43  8.86  10.00  88.64  1,278,396.61 

466 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5007+420.00  4.43  8.86  10.00  88.64  1,278,307.97 


5007+440.00  4.43  8.86  10.00  88.64  1,278,219.33 
5007+460.00  4.43  8.86  10.00  88.64  1,278,130.69 
5007+480.00  4.43  8.86  10.00  88.64  1,278,042.05 
5007+500.00  4.43  8.86  10.00  88.64  1,277,953.41 
5007+520.00  4.43  8.86  10.00  88.64  1,277,864.77 
5007+540.00  4.43  8.86  10.00  88.64  1,277,776.13 
5007+560.00  4.43  8.86  10.00  88.64  1,277,687.49 
5007+580.00  4.43  8.86  10.00  88.64  1,277,598.85 
5007+600.00  4.43  8.86  10.00  88.64  1,277,510.21 
5007+620.00  4.43  8.86  10.00  88.64  1,277,421.57 
5007+640.00  4.43  8.86  10.00  88.64  1,277,332.93 
5007+660.00  4.43  8.86  10.00  88.64  1,277,244.29 
5007+680.00  4.43  8.86  10.00  88.64  1,277,155.65 
5007+700.00  4.43  8.86  10.00  88.64  1,277,067.01 
5007+720.00  4.43  8.86  10.00  88.64  1,276,978.37 
5007+740.00  4.43  8.86  10.00  88.64  1,276,889.73 
5007+760.00  4.43  8.86  10.00  88.64  1,276,801.09 
5007+780.00  4.43  8.86  10.00  88.64  1,276,712.45 
5007+800.00  4.43  8.86  10.00  88.64  1,276,623.81 
5007+820.00  4.43  8.86  10.00  88.64  1,276,535.17 
5007+840.00  4.43  8.86  10.00  88.64  1,276,446.53 
5007+860.00  4.43  8.86  10.00  88.64  1,276,357.89 
5007+880.00  4.43  8.86  10.00  88.64  1,276,269.25 
5007+900.00  4.43  8.86  10.00  88.64  1,276,180.61 
5007+920.00  4.43  8.86  10.00  88.64  1,276,091.97 
5007+940.00  4.43  8.86  10.00  88.64  1,276,003.33 
5007+960.00  4.43  8.86  10.00  88.64  1,275,914.69 
5007+980.00  4.43  8.86  10.00  88.64  1,275,826.05 
5008+000.00  4.43  8.86  10.00  88.64  1,275,737.41 
5008+020.00  4.43  8.86  10.00  88.64  1,275,648.77 
5008+040.00  4.43  8.86  10.00  88.64  1,275,560.13 
5008+060.00  4.43  8.86  10.00  88.64  1,275,471.49 
5008+080.00  4.43  8.86  10.00  88.64  1,275,382.85 
5008+100.00  4.43  8.86  10.00  88.64  1,275,294.21 
5008+120.00  4.43  8.86  10.00  88.64  1,275,205.57 
5008+140.00  4.43  8.86  10.00  88.64  1,275,116.93 
5008+155.00  4.43  8.86  7.50  66.48  1,275,050.45 
5008+155.00  4.43  8.86  0.00  0.00  1,275,050.45 
5008+160.00  4.43  8.86  2.50  22.16  1,275,028.29 
5008+180.00  4.43  8.86  10.00  88.64  1,274,939.65 
5008+200.00  4.43  8.86  10.00  88.64  1,274,851.01 
5008+220.00  4.43  8.86  10.00  88.64  1,274,762.37 
5008+240.00  4.43  8.86  10.00  88.64  1,274,673.73 
5008+260.00  4.43  8.86  10.00  88.64  1,274,585.09 
5008+280.00  4.43  8.86  10.00  88.64  1,274,496.45 
5008+300.00  4.43  8.86  10.00  88.64  1,274,407.81 
5008+320.00  4.43  8.86  10.00  88.64  1,274,319.17 
5008+340.00  4.43  8.86  10.00  88.64  1,274,230.53 
5008+360.00  4.43  8.86  10.00  88.64  1,274,141.89 
5008+380.00  4.43  8.86  10.00  88.64  1,274,053.25 

467 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5008+380.00  4.43  8.86  0.00  0.00  1,274,053.25 


5008+400.00  4.43  8.86  10.00  88.64  1,273,964.61 
5008+420.00  4.43  8.86  10.00  88.64  1,273,875.97 
5008+440.00  4.43  8.86  10.00  88.64  1,273,787.33 
5008+460.00  4.43  8.86  10.00  88.64  1,273,698.69 
5008+470.00  4.43  8.86  5.00  44.32  1,273,654.37 
5008+480.00  4.42  8.85  5.00  44.26  1,273,610.12 
5008+490.00  4.38  8.80  5.00  44.01  1,273,566.11 
5008+500.00  4.32  8.70  5.00  43.51  1,273,522.61 
5008+510.00  4.23  8.55  5.00  42.75  1,273,479.86 
5008+520.00  4.12  8.35  5.00  41.75  1,273,438.11 
5008+530.00  3.98  8.10  5.00  40.50  1,273,397.61 
5008+540.00  3.83  7.81  5.00  39.06  1,273,358.55 
5008+550.00  3.68  7.51  5.00  37.56  1,273,320.99 
5008+560.00  3.53  7.21  5.00  36.06  1,273,284.93 
5008+570.00  3.38  6.91  5.00  34.56  1,273,250.37 
5008+580.00  3.24  6.63  5.00  33.13  1,273,217.24 
5008+590.00  3.13  6.38  5.00  31.88  1,273,185.37 
5008+600.00  3.04  6.18  5.00  30.88  1,273,154.49 
5008+610.00  2.98  6.03  5.00  30.13  1,273,124.37 
5008+620.00  2.94  5.93  5.00  29.63  1,273,094.74 
5008+629.97  2.93  5.88  4.98  29.29  1,273,065.45 
5008+629.97  2.93  5.86  0.00  0.00  1,273,065.45 
5008+640.00  2.87  5.80  5.01  29.08  1,273,036.37 
5008+649.97  2.81  5.67  4.98  28.28  1,273,008.08 
5008+649.97  2.81  5.61  0.00  0.00  1,273,008.08 
5008+660.00  2.81  5.61  5.01  28.14  1,272,979.94 
5008+680.00  2.81  5.61  10.00  56.12  1,272,923.82 
5008+700.00  2.81  5.61  10.00  56.12  1,272,867.70 
5008+720.00  2.81  5.61  10.00  56.12  1,272,811.58 
5008+740.00  2.81  5.61  10.00  56.11  1,272,755.47 
5008+760.00  2.81  5.61  10.00  56.11  1,272,699.36 
5008+780.00  2.81  5.61  10.00  56.11  1,272,643.25 
5008+800.00  2.81  5.61  10.00  56.11  1,272,587.14 
5008+820.00  2.81  5.61  10.00  56.11  1,272,531.03 
5008+840.00  2.81  5.61  10.00  56.11  1,272,474.92 
5008+860.00  2.81  5.61  10.00  56.11  1,272,418.81 
5008+880.00  2.81  5.61  10.00  56.11  1,272,362.70 
5008+900.00  2.81  5.61  10.00  56.11  1,272,306.59 
5008+920.00  2.81  5.61  10.00  56.11  1,272,250.48 
5008+940.00  2.81  5.61  10.00  56.12  1,272,194.36 
5008+960.00  2.81  5.61  10.00  56.12  1,272,138.24 
5008+980.00  2.81  5.61  10.00  56.12  1,272,082.12 
5009+000.00  2.81  5.61  10.00  56.12  1,272,026.00 
5009+020.00  2.81  5.61  10.00  56.12  1,271,969.88 
5009+040.00  2.81  5.61  10.00  56.12  1,271,913.76 
5009+060.00  2.81  5.61  10.00  56.11  1,271,857.65 
5009+080.00  2.81  5.61  10.00  56.11  1,271,801.54 
5009+090.00  2.81  5.61  5.00  28.06  1,271,773.48 
5009+090.00  2.81  5.61  0.00  0.00  1,271,773.48 
5009+100.00  2.81  5.61  5.00  28.05  1,271,745.43 

468 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5009+120.00  2.81  5.61  10.00  56.11  1,271,689.32 


5009+130.00  2.81  5.61  5.00  28.06  1,271,661.27 
5009+140.00  2.81  5.61  5.00  28.05  1,271,633.22 
5009+160.00  2.81  5.61  10.00  56.11  1,271,577.11 
5009+180.00  2.81  5.61  10.00  56.11  1,271,521.00 
5009+200.00  2.81  5.61  10.00  56.11  1,271,464.89 
5009+200.00  2.81  5.61  0.00  0.00  1,271,464.89 
5009+220.00  2.81  5.61  10.00  56.12  1,271,408.77 
5009+240.00  2.81  5.61  10.00  56.12  1,271,352.65 
5009+260.00  2.81  5.61  10.00  56.12  1,271,296.53 
5009+280.00  2.81  5.61  10.00  56.12  1,271,240.41 
5009+300.00  2.81  5.61  10.00  56.12  1,271,184.29 
5009+320.00  2.81  5.61  10.00  56.12  1,271,128.17 
5009+340.00  2.81  5.61  10.00  56.12  1,271,072.05 
5009+360.00  2.81  5.61  10.00  56.12  1,271,015.93 
5009+380.00  2.81  5.61  10.00  56.12  1,270,959.81 
5009+400.00  2.81  5.61  10.00  56.12  1,270,903.69 
5009+420.00  2.81  5.61  10.00  56.12  1,270,847.57 
5009+440.00  2.81  5.61  10.00  56.12  1,270,791.45 
5009+460.00  2.81  5.61  10.00  56.12  1,270,735.33 
5009+480.00  2.81  5.61  10.00  56.12  1,270,679.21 
5009+500.00  2.81  5.61  10.00  56.12  1,270,623.09 
5009+520.00  2.81  5.61  10.00  56.12  1,270,566.97 
5009+540.00  2.81  5.61  10.00  56.12  1,270,510.85 
5009+560.00  2.81  5.61  10.00  56.12  1,270,454.73 
5009+580.00  2.81  5.61  10.00  56.12  1,270,398.61 
5009+587.89  2.81  5.61  3.94  22.13  1,270,376.48 
5009+600.00  2.81  5.61  6.06  33.99  1,270,342.49 
5009+620.00  2.81  5.61  10.00  56.12  1,270,286.37 
5009+640.00  2.81  5.61  10.00  56.11  1,270,230.26 
5009+660.00  2.81  5.61  10.00  56.10  1,270,174.16 
5009+680.00  2.81  5.61  10.00  56.10  1,270,118.06 
5009+700.00  2.81  5.61  10.00  56.11  1,270,061.95 
5009+717.89  2.81  5.61  8.94  50.18  1,270,011.77 
5009+720.00  2.81  5.61  1.06  5.93  1,270,005.84 
5009+740.00  2.81  5.61  10.00  56.10  1,269,949.74 
5009+760.00  2.81  5.61  10.00  56.10  1,269,893.64 
5009+780.00  2.81  5.61  10.00  56.10  1,269,837.54 
5009+800.00  2.81  5.61  10.00  56.10  1,269,781.44 
5009+817.42  2.81  5.61  8.71  48.85  1,269,732.58 
5009+820.00  2.81  5.61  1.29  7.25  1,269,725.34 
5009+840.00  2.81  5.61  10.00  56.11  1,269,669.23 
5009+850.00  2.81  5.61  5.00  28.06  1,269,641.17 
5009+850.00  2.81  5.61  0.00  0.00  1,269,641.17 
5009+860.00  2.81  5.61  5.00  28.06  1,269,613.12 
5009+880.00  2.81  5.61  10.00  56.11  1,269,557.01 
5009+900.00  2.81  5.61  10.00  56.10  1,269,500.91 
5009+920.00  2.81  5.61  10.00  56.10  1,269,444.81 
5009+940.00  2.81  5.61  10.00  56.10  1,269,388.71 
5009+947.42  2.81  5.61  3.71  20.81  1,269,367.90 
5009+960.00  2.81  5.61  6.29  35.31  1,269,332.59 

469 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5009+980.00  2.81  5.61  10.00  56.12  1,269,276.47 


5010+000.00  2.81  5.61  10.00  56.12  1,269,220.35 
5010+020.00  2.81  5.61  10.00  56.12  1,269,164.23 
5010+040.00  2.81  5.61  10.00  56.12  1,269,108.11 
5010+060.00  2.81  5.61  10.00  56.12  1,269,051.99 
5010+080.00  2.81  5.61  10.00  56.12  1,268,995.87 
5010+100.00  2.81  5.61  10.00  56.12  1,268,939.75 
5010+120.00  2.81  5.61  10.00  56.12  1,268,883.63 
5010+140.00  2.81  5.61  10.00  56.12  1,268,827.51 
5010+160.00  2.81  5.61  10.00  56.12  1,268,771.39 
5010+180.00  2.81  5.61  10.00  56.12  1,268,715.27 
5010+200.00  2.81  5.61  10.00  56.12  1,268,659.15 
5010+220.00  2.81  5.61  10.00  56.12  1,268,603.03 
5010+240.00  2.81  5.61  10.00  56.12  1,268,546.91 
5010+260.00  2.81  5.61  10.00  56.12  1,268,490.79 
5010+280.00  2.81  5.61  10.00  56.12  1,268,434.67 
5010+300.00  2.81  5.61  10.00  56.12  1,268,378.55 
5010+320.00  2.81  5.61  10.00  56.12  1,268,322.43 
5010+340.00  2.81  5.61  10.00  56.12  1,268,266.31 
5010+360.00  2.81  5.61  10.00  56.12  1,268,210.19 
5010+380.00  2.81  5.61  10.00  56.12  1,268,154.07 
5010+400.00  2.81  5.61  10.00  56.12  1,268,097.95 
5010+420.00  2.81  5.61  10.00  56.12  1,268,041.83 
5010+440.00  2.81  5.61  10.00  56.12  1,267,985.71 
5010+460.00  2.81  5.61  10.00  56.12  1,267,929.59 
5010+480.00  2.81  5.61  10.00  56.12  1,267,873.47 
5010+500.00  2.81  5.61  10.00  56.12  1,267,817.35 
5010+520.00  2.81  5.61  10.00  56.12  1,267,761.23 
5010+540.00  2.81  5.61  10.00  56.12  1,267,705.11 
5010+560.00  2.81  5.61  10.00  56.12  1,267,648.99 
5010+580.00  2.81  5.61  10.00  56.12  1,267,592.87 
5010+600.00  2.81  5.61  10.00  56.12  1,267,536.75 
5010+620.00  2.81  5.61  10.00  56.12  1,267,480.63 
5010+640.00  2.81  5.61  10.00  56.12  1,267,424.51 
5010+660.00  2.81  5.61  10.00  56.12  1,267,368.39 
5010+680.00  2.81  5.61  10.00  56.12  1,267,312.27 
5010+700.00  2.81  5.61  10.00  56.12  1,267,256.15 
5010+720.00  2.81  5.61  10.00  56.12  1,267,200.03 
5010+740.00  2.81  5.61  10.00  56.11  1,267,143.92 
5010+760.00  2.81  5.61  10.00  56.11  1,267,087.81 
5010+780.00  2.81  5.61  10.00  56.12  1,267,031.69 
5010+800.00  2.81  5.61  10.00  56.11  1,266,975.58 
5010+820.00  2.81  5.61  10.00  56.10  1,266,919.48 
5010+840.00  2.81  5.61  10.00  56.10  1,266,863.38 
5010+860.00  2.81  5.61  10.00  56.11  1,266,807.27 
5010+880.00  2.81  5.61  10.00  56.11  1,266,751.16 
5010+900.00  2.81  5.61  10.00  56.10  1,266,695.06 
5010+920.00  2.81  5.61  10.00  56.10  1,266,638.96 
5010+940.00  2.81  5.61  10.00  56.10  1,266,582.86 
5010+960.00  2.81  5.61  10.00  56.11  1,266,526.75 
5010+980.00  2.81  5.61  10.00  56.11  1,266,470.64 

470 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5011+000.00  2.81  5.61  10.00  56.10  1,266,414.54 


5011+020.00  2.81  5.61  10.00  56.11  1,266,358.43 
5011+040.00  2.81  5.61  10.00  56.11  1,266,302.32 
5011+060.00  2.81  5.61  10.00  56.11  1,266,246.21 
5011+080.00  2.81  5.61  10.00  56.12  1,266,190.09 
5011+100.00  2.81  5.61  10.00  56.11  1,266,133.98 
5011+120.00  2.81  5.61  10.00  56.10  1,266,077.88 
5011+140.00  2.81  5.61  10.00  56.10  1,266,021.78 
5011+160.00  2.81  5.61  10.00  56.11  1,265,965.67 
5011+180.00  2.81  5.61  10.00  56.11  1,265,909.56 
5011+200.00  2.81  5.61  10.00  56.11  1,265,853.45 
5011+220.00  2.81  5.61  10.00  56.12  1,265,797.33 
5011+240.00  2.81  5.61  10.00  56.12  1,265,741.21 
5011+260.00  2.81  5.61  10.00  56.12  1,265,685.09 
5011+280.00  2.81  5.61  10.00  56.12  1,265,628.97 
5011+300.00  2.81  5.61  10.00  56.12  1,265,572.85 
5011+320.00  2.81  5.61  10.00  56.12  1,265,516.73 
5011+340.00  2.81  5.61  10.00  56.12  1,265,460.61 
5011+360.00  2.81  5.61  10.00  56.12  1,265,404.49 
5011+380.00  2.81  5.61  10.00  56.12  1,265,348.37 
5011+400.00  2.81  5.61  10.00  56.12  1,265,292.25 
5011+420.00  2.81  5.61  10.00  56.11  1,265,236.14 
5011+420.00  2.81  5.61  0.00  0.00  1,265,236.14 
5011+440.00  2.81  5.61  10.00  56.10  1,265,180.04 
5011+460.00  2.81  5.61  10.00  56.11  1,265,123.93 
5011+480.00  2.81  5.61  10.00  56.11  1,265,067.82 
5011+500.00  2.81  5.61  10.00  56.10  1,265,011.72 
5011+520.00  2.81  5.61  10.00  56.10  1,264,955.62 
5011+540.00  2.81  5.61  10.00  56.10  1,264,899.52 
5011+560.00  2.81  5.61  10.00  56.10  1,264,843.42 
5011+580.00  2.81  5.61  10.00  56.10  1,264,787.32 
5011+600.00  2.81  5.61  10.00  56.10  1,264,731.22 
5011+620.00  2.81  5.61  10.00  56.10  1,264,675.12 
5011+640.00  2.81  5.61  10.00  56.11  1,264,619.01 
5011+660.00  2.81  5.61  10.00  56.11  1,264,562.90 
5011+680.00  2.81  5.61  10.00  56.10  1,264,506.80 
5011+700.00  2.81  5.61  10.00  56.11  1,264,450.69 
5011+720.00  2.81  5.61  10.00  56.12  1,264,394.57 
5011+740.00  2.81  5.61  10.00  56.11  1,264,338.46 
5011+760.00  2.81  5.61  10.00  56.10  1,264,282.36 
5011+780.00  2.81  5.61  10.00  56.11  1,264,226.25 
5011+800.00  2.81  5.61  10.00  56.11  1,264,170.14 
5011+820.00  2.81  5.61  10.00  56.10  1,264,114.04 
5011+840.00  2.81  5.61  10.00  56.10  1,264,057.94 
5011+860.00  2.81  5.61  10.00  56.10  1,264,001.84 
5011+880.00  2.81  5.61  10.00  56.11  1,263,945.73 
5011+900.00  2.81  5.61  10.00  56.11  1,263,889.62 
5011+920.00  2.81  5.61  10.00  56.11  1,263,833.51 
5011+940.00  2.81  5.61  10.00  56.12  1,263,777.39 
5011+940.00  2.81  5.61  0.00  0.00  1,263,777.39 
5011+960.00  2.81  5.61  10.00  56.11  1,263,721.28 

471 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5011+980.00  2.81  5.61  10.00  56.10  1,263,665.18 


5012+000.00  2.81  5.61  10.00  56.10  1,263,609.08 
5012+000.00  2.93  5.73  0.00  0.00  1,263,609.08 
5012+020.00  2.93  5.85  10.00  58.51  1,263,550.57 
5012+040.00  2.93  5.85  10.00  58.52  1,263,492.05 
5012+060.00  2.93  5.85  10.00  58.51  1,263,433.54 
5012+080.00  2.93  5.85  10.00  58.50  1,263,375.04 
5012+100.00  2.93  5.85  10.00  58.50  1,263,316.54 
5012+120.00  2.93  5.85  10.00  58.50  1,263,258.04 
5012+140.00  2.93  5.85  10.00  58.50  1,263,199.54 
5012+160.00  2.93  5.85  10.00  58.51  1,263,141.03 
5012+180.00  2.93  5.85  10.00  58.52  1,263,082.51 
5012+200.00  2.93  5.85  10.00  58.51  1,263,024.00 
5012+220.00  2.93  5.85  10.00  58.50  1,262,965.50 
5012+240.00  2.93  5.85  10.00  58.51  1,262,906.99 
5012+260.00  2.93  5.85  10.00  58.51  1,262,848.48 
5012+280.00  2.93  5.85  10.00  58.50  1,262,789.98 
5012+300.00  2.93  5.85  10.00  58.50  1,262,731.48 
5012+320.00  2.93  5.85  10.00  58.51  1,262,672.97 
5012+340.00  2.93  5.85  10.00  58.51  1,262,614.46 
5012+360.00  2.93  5.85  10.00  58.50  1,262,555.96 
5012+380.00  2.93  5.85  10.00  58.50  1,262,497.46 
5012+400.00  2.93  5.85  10.00  58.51  1,262,438.95 
5012+420.00  2.93  5.85  10.00  58.52  1,262,380.43 
5012+420.00  2.93  5.85  0.00  0.00  1,262,380.43 
5012+440.00  2.93  5.85  10.00  58.51  1,262,321.92 
5012+460.00  2.93  5.85  10.00  58.50  1,262,263.42 
5012+480.00  2.93  5.85  10.00  58.50  1,262,204.92 
5012+500.00  2.93  5.85  10.00  58.50  1,262,146.42 
5012+520.00  2.93  5.85  10.00  58.51  1,262,087.91 
5012+540.00  2.93  5.85  10.00  58.52  1,262,029.39 
5012+560.00  2.93  5.85  10.00  58.52  1,261,970.87 
5012+580.00  2.93  5.85  10.00  58.51  1,261,912.36 
5012+600.00  2.93  5.85  10.00  58.50  1,261,853.86 
5012+600.00  2.93  5.85  0.00  0.00  1,261,853.86 
5012+620.00  2.93  5.85  10.00  58.50  1,261,795.36 
5012+640.00  2.93  5.85  10.00  58.51  1,261,736.85 
5012+660.00  2.93  5.85  10.00  58.51  1,261,678.34 
5012+680.00  2.93  5.85  10.00  58.51  1,261,619.83 
5012+700.00  2.93  5.85  10.00  58.51  1,261,561.32 
5012+720.00  2.93  5.85  10.00  58.50  1,261,502.82 
5012+740.00  2.93  5.85  10.00  58.50  1,261,444.32 
5012+760.00  2.93  5.85  10.00  58.50  1,261,385.82 
5012+780.00  2.93  5.85  10.00  58.51  1,261,327.31 
5012+800.00  2.93  5.85  10.00  58.52  1,261,268.79 
5012+820.00  2.93  5.85  10.00  58.51  1,261,210.28 
5012+840.00  2.93  5.85  10.00  58.50  1,261,151.78 
5012+860.00  2.93  5.85  10.00  58.50  1,261,093.28 
5012+880.00  2.93  5.85  10.00  58.50  1,261,034.78 
5012+900.00  2.93  5.85  10.00  58.51  1,260,976.27 
5012+920.00  2.93  5.85  10.00  58.52  1,260,917.75 

472 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5012+940.00  2.93  5.85  10.00  58.51  1,260,859.24 


5012+960.00  2.93  5.85  10.00  58.50  1,260,800.74 
5012+980.00  2.93  5.85  10.00  58.50  1,260,742.24 
5013+000.00  2.93  5.85  10.00  58.50  1,260,683.74 
5013+020.00  2.93  5.85  10.00  58.51  1,260,625.23 
5013+040.00  2.93  5.85  10.00  58.52  1,260,566.71 
5013+060.00  2.93  5.85  10.00  58.51  1,260,508.20 
5013+080.00  2.93  5.85  10.00  58.50  1,260,449.70 
5013+100.00  2.93  5.85  10.00  58.50  1,260,391.20 
5013+120.00  2.93  5.85  10.00  58.50  1,260,332.70 
5013+140.00  2.93  5.85  10.00  58.51  1,260,274.19 
5013+160.00  2.93  5.85  10.00  58.51  1,260,215.68 
5013+180.00  2.93  5.85  10.00  58.51  1,260,157.17 
5013+200.00  2.93  5.85  10.00  58.51  1,260,098.66 
5013+220.00  2.93  5.85  10.00  58.50  1,260,040.16 
5013+235.00  2.93  5.85  7.50  43.88  1,259,996.29 
5013+235.00  2.93  5.85  0.00  0.00  1,259,996.29 
5013+240.00  2.93  5.85  2.50  14.63  1,259,981.66 
5013+260.00  2.93  5.85  10.00  58.50  1,259,923.16 
5013+280.00  2.93  5.85  10.00  58.50  1,259,864.66 
5013+300.00  2.93  5.85  10.00  58.50  1,259,806.16 
5013+320.00  2.93  5.85  10.00  58.50  1,259,747.66 
5013+340.00  2.93  5.85  10.00  58.50  1,259,689.16 
5013+360.00  2.93  5.85  10.00  58.50  1,259,630.66 
5013+380.00  2.93  5.85  10.00  58.50  1,259,572.16 
5013+390.00  2.93  5.85  5.00  29.25  1,259,542.91 
5013+390.00  2.93  5.85  0.00  0.00  1,259,542.91 
5013+400.00  2.93  5.85  5.00  29.25  1,259,513.66 
5013+420.00  2.93  5.85  10.00  58.50  1,259,455.16 
5013+440.00  2.93  5.85  10.00  58.51  1,259,396.65 
5013+460.00  2.93  5.85  10.00  58.51  1,259,338.14 
5013+480.00  2.93  5.85  10.00  58.51  1,259,279.63 
5013+500.00  2.93  5.85  10.00  58.51  1,259,221.12 
5013+520.00  2.93  5.85  10.00  58.50  1,259,162.62 
5013+540.00  2.93  5.85  10.00  58.50  1,259,104.12 
5013+560.00  2.93  5.85  10.00  58.50  1,259,045.62 
5013+580.00  2.93  5.85  10.00  58.50  1,258,987.12 
5013+600.00  2.93  5.85  10.00  58.51  1,258,928.61 
5013+620.00  2.93  5.85  10.00  58.51  1,258,870.10 
5013+640.00  2.93  5.85  10.00  58.50  1,258,811.60 
5013+660.00  2.93  5.85  10.00  58.50  1,258,753.10 
5013+680.00  2.93  5.85  10.00  58.50  1,258,694.60 
5013+700.00  2.93  5.85  10.00  58.50  1,258,636.10 
5013+720.00  2.93  5.85  10.00  58.51  1,258,577.59 
5013+740.00  2.93  5.85  10.00  58.52  1,258,519.07 
5013+760.00  2.93  5.85  10.00  58.51  1,258,460.56 
5013+780.00  2.93  5.85  10.00  58.51  1,258,402.05 
5013+800.00  2.93  5.85  10.00  58.52  1,258,343.53 
5013+820.00  2.93  5.85  10.00  58.51  1,258,285.02 
5013+840.00  2.93  5.85  10.00  58.50  1,258,226.52 
5013+860.00  2.93  5.85  10.00  58.50  1,258,168.02 

473 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5013+880.00  2.93  5.85  10.00  58.50  1,258,109.52 


5013+900.00  2.93  5.85  10.00  58.50  1,258,051.02 
5013+920.00  2.93  5.85  10.00  58.50  1,257,992.52 
5013+940.00  2.93  5.85  10.00  58.50  1,257,934.02 
5013+960.00  2.93  5.85  10.00  58.50  1,257,875.52 
5013+980.00  2.93  5.85  10.00  58.50  1,257,817.02 
5014+000.00  2.93  5.85  10.00  58.50  1,257,758.52 
5014+020.00  2.93  5.85  10.00  58.50  1,257,700.02 
5014+040.00  2.93  5.85  10.00  58.50  1,257,641.52 
5014+060.00  2.93  5.85  10.00  58.51  1,257,583.01 
5014+060.00  2.93  5.85  0.00  0.00  1,257,583.01 
5014+080.00  2.93  5.85  10.00  58.51  1,257,524.50 
5014+100.00  2.93  5.85  10.00  58.50  1,257,466.00 
5014+120.00  2.93  5.85  10.00  58.50  1,257,407.50 
5014+140.00  2.93  5.85  10.00  58.50  1,257,349.00 
5014+160.00  2.93  5.85  10.00  58.51  1,257,290.49 
5014+180.00  2.93  5.85  10.00  58.51  1,257,231.98 
5014+200.00  2.93  5.85  10.00  58.50  1,257,173.48 
5014+220.00  2.93  5.85  10.00  58.50  1,257,114.98 
5014+240.00  2.93  5.85  10.00  58.50  1,257,056.48 
5014+260.00  2.93  5.85  10.00  58.51  1,256,997.97 
5014+280.00  2.93  5.85  10.00  58.52  1,256,939.45 
5014+300.00  2.93  5.85  10.00  58.51  1,256,880.94 
5014+320.00  2.93  5.85  10.00  58.51  1,256,822.43 
5014+340.00  2.93  5.85  10.00  58.52  1,256,763.91 
5014+360.00  2.93  5.85  10.00  58.51  1,256,705.40 
5014+380.00  2.93  5.85  10.00  58.50  1,256,646.90 
5014+400.00  2.93  5.85  10.00  58.50  1,256,588.40 
5014+420.00  2.93  5.85  10.00  58.50  1,256,529.90 
5014+440.00  2.93  5.85  10.00  58.50  1,256,471.40 
5014+460.00  2.93  5.85  10.00  58.50  1,256,412.90 
5014+480.00  2.93  5.85  10.00  58.50  1,256,354.40 
5014+500.00  2.93  5.85  10.00  58.50  1,256,295.90 
5014+520.00  2.93  5.85  10.00  58.50  1,256,237.40 
5014+540.00  2.93  5.85  10.00  58.51  1,256,178.89 
5014+560.00  2.93  5.85  10.00  58.51  1,256,120.38 
5014+580.00  2.93  5.85  10.00  58.51  1,256,061.87 
5014+600.00  2.93  5.85  10.00  58.51  1,256,003.36 
5014+620.00  2.93  5.85  10.00  58.51  1,255,944.85 
5014+640.00  2.93  5.85  10.00  58.51  1,255,886.34 
5014+660.00  2.93  5.85  10.00  58.51  1,255,827.83 
5014+680.00  2.93  5.85  10.00  58.51  1,255,769.32 
5014+700.00  2.93  5.85  10.00  58.50  1,255,710.82 
5014+720.00  2.93  5.85  10.00  58.50  1,255,652.32 
5014+740.00  2.93  5.85  10.00  58.50  1,255,593.82 
5014+760.00  2.93  5.85  10.00  58.51  1,255,535.31 
5014+780.00  2.93  5.85  10.00  58.51  1,255,476.80 
5014+800.00  2.93  5.85  10.00  58.50  1,255,418.30 
5014+820.00  2.93  5.85  10.00  58.51  1,255,359.79 
5014+840.00  2.93  5.85  10.00  58.51  1,255,301.28 
5014+860.00  2.93  5.85  10.00  58.51  1,255,242.77 

474 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5014+880.00  2.93  5.85  10.00  58.51  1,255,184.26 


5014+900.00  2.93  5.85  10.00  58.51  1,255,125.75 
5014+920.00  2.93  5.85  10.00  58.51  1,255,067.24 
5014+940.00  2.93  5.85  10.00  58.50  1,255,008.74 
5014+960.00  2.93  5.85  10.00  58.51  1,254,950.23 
5014+980.00  2.93  5.85  10.00  58.51  1,254,891.72 
5015+000.00  2.93  5.85  10.00  58.51  1,254,833.21 
5015+020.00  2.93  5.85  10.00  58.51  1,254,774.70 
5015+040.00  2.93  5.85  10.00  58.50  1,254,716.20 
5015+060.00  2.93  5.85  10.00  58.50  1,254,657.70 
5015+080.00  2.93  5.85  10.00  58.51  1,254,599.19 
5015+100.00  2.93  5.85  10.00  58.51  1,254,540.68 
5015+120.00  2.93  5.85  10.00  58.50  1,254,482.18 
5015+140.00  2.93  5.85  10.00  58.50  1,254,423.68 
5015+160.00  2.93  5.85  10.00  58.50  1,254,365.18 
5015+180.00  2.93  5.85  10.00  58.50  1,254,306.68 
5015+200.00  2.93  5.85  10.00  58.51  1,254,248.17 
5015+220.00  2.93  5.85  10.00  58.51  1,254,189.66 
5015+240.00  2.93  5.85  10.00  58.50  1,254,131.16 
5015+260.00  2.93  5.85  10.00  58.51  1,254,072.65 
5015+280.00  2.93  5.85  10.00  58.52  1,254,014.13 
5015+300.00  2.93  5.85  10.00  58.51  1,253,955.62 
5015+320.00  2.93  5.85  10.00  58.50  1,253,897.12 
5015+340.00  2.93  5.85  10.00  58.51  1,253,838.61 
5015+360.00  2.93  5.85  10.00  58.51  1,253,780.10 
5015+380.00  2.93  5.85  10.00  58.50  1,253,721.60 
5015+400.00  2.93  5.85  10.00  58.51  1,253,663.09 
5015+420.00  2.93  5.85  10.00  58.51  1,253,604.58 
5015+440.00  2.93  5.85  10.00  58.50  1,253,546.08 
5015+460.00  2.93  5.85  10.00  58.51  1,253,487.57 
5015+480.00  2.93  5.85  10.00  58.51  1,253,429.06 
5015+500.00  2.93  5.85  10.00  58.51  1,253,370.55 
5015+520.00  2.93  5.85  10.00  58.52  1,253,312.03 
5015+540.00  2.93  5.85  10.00  58.51  1,253,253.52 
5015+560.00  2.93  5.85  10.00  58.50  1,253,195.02 
5015+580.00  2.93  5.85  10.00  58.51  1,253,136.51 
5015+600.00  2.93  5.85  10.00  58.51  1,253,078.00 
5015+620.00  2.93  5.85  10.00  58.50  1,253,019.50 
5015+640.00  2.93  5.85  10.00  58.50  1,252,961.00 
5015+660.00  2.93  5.85  10.00  58.50  1,252,902.50 
5015+680.00  2.93  5.85  10.00  58.51  1,252,843.99 
5015+700.00  2.93  5.85  10.00  58.51  1,252,785.48 
5015+720.00  2.93  5.85  10.00  58.51  1,252,726.97 
5015+740.00  2.93  5.85  10.00  58.51  1,252,668.46 
5015+760.00  2.93  5.85  10.00  58.51  1,252,609.95 
5015+780.00  2.93  5.85  10.00  58.51  1,252,551.44 
5015+800.00  2.93  5.85  10.00  58.51  1,252,492.93 
5015+820.00  2.93  5.85  10.00  58.51  1,252,434.42 
5015+830.00  2.93  5.85  5.00  29.25  1,252,405.17 
5015+830.00  2.93  5.85  0.00  0.00  1,252,405.17 
5015+840.00  2.93  5.85  5.00  29.25  1,252,375.92 

475 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5015+860.00  2.93  5.85  10.00  58.50  1,252,317.42 


5015+880.00  2.93  5.85  10.00  58.50  1,252,258.92 
5015+900.00  2.93  5.85  10.00  58.51  1,252,200.41 
5015+920.00  2.93  5.85  10.00  58.51  1,252,141.90 
5015+940.00  2.93  5.85  10.00  58.50  1,252,083.40 
5015+960.00  2.93  5.85  10.00  58.50  1,252,024.90 
5015+980.00  2.93  5.85  10.00  58.51  1,251,966.39 
5016+000.00  2.93  5.85  10.00  58.51  1,251,907.88 
5016+020.00  2.93  5.85  10.00  58.50  1,251,849.38 
5016+040.00  2.93  5.85  10.00  58.50  1,251,790.88 
5016+060.00  2.93  5.85  10.00  58.50  1,251,732.38 
5016+080.00  2.93  5.85  10.00  58.50  1,251,673.88 
5016+100.00  2.93  5.85  10.00  58.50  1,251,615.38 
5016+120.00  2.93  5.85  10.00  58.50  1,251,556.88 
5016+140.00  2.93  5.85  10.00  58.50  1,251,498.38 
5016+160.00  2.93  5.85  10.00  58.50  1,251,439.88 
5016+180.00  2.93  5.85  10.00  58.51  1,251,381.37 
5016+200.00  2.93  5.85  10.00  58.51  1,251,322.86 
5016+220.00  2.93  5.85  10.00  58.50  1,251,264.36 
5016+240.00  2.93  5.85  10.00  58.51  1,251,205.85 
5016+260.00  2.93  5.85  10.00  58.51  1,251,147.34 
5016+280.00  2.93  5.85  10.00  58.50  1,251,088.84 
5016+300.00  2.93  5.85  10.00  58.51  1,251,030.33 
5016+320.00  2.93  5.85  10.00  58.51  1,250,971.82 
5016+340.00  2.93  5.85  10.00  58.50  1,250,913.32 
5016+360.00  2.93  5.85  10.00  58.50  1,250,854.82 
5016+380.00  2.93  5.85  10.00  58.51  1,250,796.31 
5016+400.00  2.93  5.85  10.00  58.51  1,250,737.80 
5016+420.00  2.93  5.85  10.00  58.50  1,250,679.30 
5016+440.00  2.93  5.85  10.00  58.50  1,250,620.80 
5016+460.00  2.93  5.85  10.00  58.50  1,250,562.30 
5016+480.00  2.93  5.85  10.00  58.51  1,250,503.79 
5016+500.00  2.93  5.85  10.00  58.51  1,250,445.28 
5016+520.00  2.93  5.85  10.00  58.51  1,250,386.77 
5016+520.00  2.93  5.85  0.00  0.00  1,250,386.77 
5016+540.00  2.93  5.85  10.00  58.51  1,250,328.26 
5016+560.00  2.93  5.85  10.00  58.51  1,250,269.75 
5016+580.00  2.93  5.85  10.00  58.51  1,250,211.24 
5016+600.00  2.93  5.85  10.00  58.50  1,250,152.74 
5016+600.00  2.93  5.85  0.00  0.00  1,250,152.74 
5016+620.00  2.93  5.85  10.00  58.50  1,250,094.24 
5016+640.00  2.93  5.85  10.00  58.50  1,250,035.74 
5016+660.00  2.93  5.85  10.00  58.50  1,249,977.24 
5016+680.00  2.93  5.85  10.00  58.50  1,249,918.74 
5016+700.00  2.93  5.85  10.00  58.50  1,249,860.24 
5016+720.00  2.93  5.85  10.00  58.50  1,249,801.74 
5016+740.00  2.93  5.85  10.00  58.50  1,249,743.24 
5016+760.00  2.93  5.85  10.00  58.51  1,249,684.73 
5016+780.00  2.93  5.85  10.00  58.51  1,249,626.22 
5016+800.00  2.93  5.85  10.00  58.50  1,249,567.72 
5016+820.00  2.93  5.85  10.00  58.50  1,249,509.22 

476 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5016+840.00  2.93  5.85  10.00  58.51  1,249,450.71 


5016+860.00  2.93  5.85  10.00  58.52  1,249,392.19 
5016+880.00  2.93  5.85  10.00  58.51  1,249,333.68 
5016+900.00  2.93  5.85  10.00  58.50  1,249,275.18 
5016+920.00  2.93  5.85  10.00  58.50  1,249,216.68 
5016+940.00  2.93  5.85  10.00  58.50  1,249,158.18 
5016+960.00  2.93  5.85  10.00  58.50  1,249,099.68 
5016+980.00  2.93  5.85  10.00  58.51  1,249,041.17 
5017+000.00  2.93  5.85  10.00  58.51  1,248,982.66 
5017+020.00  2.93  5.85  10.00  58.50  1,248,924.16 
5017+040.00  2.93  5.85  10.00  58.50  1,248,865.66 
5017+060.00  2.93  5.85  10.00  58.50  1,248,807.16 
5017+080.00  2.93  5.85  10.00  58.50  1,248,748.66 
5017+100.00  2.93  5.85  10.00  58.51  1,248,690.15 
5017+120.00  2.93  5.85  10.00  58.51  1,248,631.64 
5017+140.00  2.93  5.85  10.00  58.50  1,248,573.14 
5017+160.00  2.93  5.85  10.00  58.51  1,248,514.63 
5017+180.00  2.93  5.85  10.00  58.51  1,248,456.12 
5017+200.00  2.93  5.85  10.00  58.50  1,248,397.62 
5017+220.00  2.93  5.85  10.00  58.51  1,248,339.11 
5017+240.00  2.93  5.85  10.00  58.52  1,248,280.59 
5017+260.00  2.93  5.85  10.00  58.51  1,248,222.08 
5017+280.00  2.93  5.85  10.00  58.50  1,248,163.58 
5017+300.00  2.93  5.85  10.00  58.51  1,248,105.07 
5017+320.00  2.93  5.85  10.00  58.51  1,248,046.56 
5017+340.00  2.93  5.85  10.00  58.50  1,247,988.06 
5017+340.00  2.93  5.85  0.00  0.00  1,247,988.06 
5017+360.00  2.93  5.85  10.00  58.51  1,247,929.55 
5017+380.00  2.93  5.85  10.00  58.51  1,247,871.04 
5017+400.00  2.93  5.85  10.00  58.50  1,247,812.54 
5017+420.00  2.93  5.85  10.00  58.50  1,247,754.04 
5017+440.00  2.93  5.85  10.00  58.51  1,247,695.53 
5017+460.00  2.93  5.85  10.00  58.51  1,247,637.02 
5017+480.00  2.93  5.85  10.00  58.50  1,247,578.52 
5017+500.00  2.93  5.85  10.00  58.51  1,247,520.01 
5017+520.00  2.93  5.85  10.00  58.51  1,247,461.50 
5017+540.00  2.93  5.85  10.00  58.50  1,247,403.00 
5017+560.00  2.93  5.85  10.00  58.50  1,247,344.50 
5017+563.95  2.93  5.85  1.97  11.54  1,247,332.96 
5017+580.00  2.93  5.85  8.03  46.96  1,247,286.00 
5017+593.95  2.93  5.85  6.97  40.80  1,247,245.21 
5017+600.00  2.93  5.85  3.03  17.71  1,247,227.49 
5017+620.00  2.93  5.85  10.00  58.50  1,247,168.99 
5017+640.00  2.93  5.85  10.00  58.50  1,247,110.49 
5017+660.00  2.93  5.85  10.00  58.50  1,247,051.99 
5017+678.40  2.93  5.85  9.20  53.82  1,246,998.17 
5017+680.00  2.93  5.85  0.80  4.68  1,246,993.49 
5017+680.00  2.93  5.85  0.00  0.00  1,246,993.49 
5017+700.00  2.93  5.85  10.00  58.50  1,246,934.99 
5017+708.40  2.93  5.85  4.20  24.57  1,246,910.42 
5017+720.00  2.93  5.85  5.80  33.93  1,246,876.49 

477 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5017+740.00  2.93  5.85  10.00  58.51  1,246,817.98 


5017+760.00  2.93  5.85  10.00  58.51  1,246,759.47 
5017+780.00  2.93  5.85  10.00  58.50  1,246,700.97 
5017+800.00  2.93  5.85  10.00  58.50  1,246,642.47 
5017+820.00  2.93  5.85  10.00  58.51  1,246,583.96 
5017+840.00  2.93  5.85  10.00  58.51  1,246,525.45 
5017+860.00  2.93  5.85  10.00  58.50  1,246,466.95 
5017+880.00  2.93  5.85  10.00  58.50  1,246,408.45 
5017+900.00  2.93  5.85  10.00  58.50  1,246,349.95 
5017+920.00  2.93  5.85  10.00  58.51  1,246,291.44 
5017+940.00  2.93  5.85  10.00  58.51  1,246,232.93 
5017+960.00  2.93  5.85  10.00  58.50  1,246,174.43 
5017+980.00  2.93  5.85  10.00  58.50  1,246,115.93 
5018+000.00  2.93  5.85  10.00  58.50  1,246,057.43 
5018+020.00  2.93  5.85  10.00  58.50  1,245,998.93 
5018+040.00  2.93  5.85  10.00  58.51  1,245,940.42 
5018+040.00  2.93  5.85  0.00  0.00  1,245,940.42 
5018+060.00  2.93  5.85  10.00  58.51  1,245,881.91 
5018+080.00  2.93  5.85  10.00  58.50  1,245,823.41 
5018+100.00  2.93  5.85  10.00  58.51  1,245,764.90 
5018+120.00  2.93  5.85  10.00  58.52  1,245,706.38 
5018+140.00  2.93  5.85  10.00  58.51  1,245,647.87 
5018+160.00  2.93  5.85  10.00  58.50  1,245,589.37 
5018+180.00  2.93  5.85  10.00  58.50  1,245,530.87 
5018+200.00  2.93  5.85  10.00  58.50  1,245,472.37 
5018+220.00  2.93  5.85  10.00  58.50  1,245,413.87 
5018+240.00  2.93  5.85  10.00  58.50  1,245,355.37 
5018+260.00  2.93  5.85  10.00  58.50  1,245,296.87 
5018+280.00  2.93  5.85  10.00  58.50  1,245,238.37 
5018+300.00  2.93  5.85  10.00  58.50  1,245,179.87 
5018+320.00  2.93  5.85  10.00  58.51  1,245,121.36 
5018+340.00  2.93  5.85  10.00  58.51  1,245,062.85 
5018+360.00  2.93  5.85  10.00  58.50  1,245,004.35 
5018+380.00  2.93  5.85  10.00  58.51  1,244,945.84 
5018+400.00  2.93  5.85  10.00  58.51  1,244,887.33 
5018+420.00  2.93  5.85  10.00  58.51  1,244,828.82 
5018+440.00  2.93  5.85  10.00  58.51  1,244,770.31 
5018+460.00  2.93  5.85  10.00  58.50  1,244,711.81 
5018+480.00  2.93  5.85  10.00  58.50  1,244,653.31 
5018+500.00  2.93  5.85  10.00  58.50  1,244,594.81 
5018+520.00  2.93  5.85  10.00  58.50  1,244,536.31 
5018+540.00  2.93  5.85  10.00  58.51  1,244,477.80 
5018+560.00  2.93  5.85  10.00  58.51  1,244,419.29 
5018+580.00  2.93  5.85  10.00  58.50  1,244,360.79 
5018+600.00  2.93  5.85  10.00  58.50  1,244,302.29 
5018+620.00  2.93  5.85  10.00  58.51  1,244,243.78 
5018+640.00  2.93  5.85  10.00  58.51  1,244,185.27 
5018+660.00  2.93  5.85  10.00  58.51  1,244,126.76 
5018+680.00  2.93  5.85  10.00  58.51  1,244,068.25 
5018+700.00  2.93  5.85  10.00  58.50  1,244,009.75 
5018+720.00  2.93  5.85  10.00  58.50  1,243,951.25 

478 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5018+740.00  2.92  5.85  10.00  58.49  1,243,892.76 


5018+760.00  2.93  5.85  10.00  58.49  1,243,834.27 
5018+780.00  2.93  5.85  10.00  58.51  1,243,775.76 
5018+800.00  2.93  5.85  10.00  58.51  1,243,717.25 
5018+820.00  2.93  5.85  10.00  58.50  1,243,658.75 
5018+840.00  2.93  5.85  10.00  58.51  1,243,600.24 
5018+860.00  2.93  5.85  10.00  58.51  1,243,541.73 
5018+880.00  2.93  5.85  10.00  58.51  1,243,483.22 
5018+900.00  2.93  5.85  10.00  58.52  1,243,424.70 
5018+920.00  2.93  5.85  10.00  58.51  1,243,366.19 
5018+939.87  2.93  5.85  9.93  58.11  1,243,308.08 
5018+940.00  2.93  5.85  0.07  0.39  1,243,307.69 
5018+960.00  2.93  5.85  10.00  58.50  1,243,249.19 
5018+979.87  2.93  5.85  9.93  58.12  1,243,191.07 
5018+980.00  2.93  5.85  0.07  0.39  1,243,190.68 
5019+000.00  2.93  5.85  10.00  58.50  1,243,132.18 
5019+020.00  2.93  5.85  10.00  58.51  1,243,073.67 
5019+040.00  2.93  5.85  10.00  58.51  1,243,015.16 
5019+060.00  2.93  5.85  10.00  58.50  1,242,956.66 
5019+062.97  2.93  5.85  1.48  8.68  1,242,947.98 
5019+080.00  2.93  5.85  8.52  49.82  1,242,898.16 
5019+100.00  2.93  5.85  10.00  58.50  1,242,839.66 
5019+102.97  2.93  5.85  1.48  8.68  1,242,830.98 
5019+120.00  2.93  5.85  8.52  49.83  1,242,781.15 
5019+140.00  2.93  5.85  10.00  58.51  1,242,722.64 
5019+160.00  2.93  5.85  10.00  58.50  1,242,664.14 
5019+180.00  2.93  5.85  10.00  58.50  1,242,605.64 
5019+200.00  2.93  5.85  10.00  58.50  1,242,547.14 
5019+220.00  2.93  5.85  10.00  58.50  1,242,488.64 
5019+240.00  2.93  5.85  10.00  58.50  1,242,430.14 
5019+260.00  2.93  5.85  10.00  58.50  1,242,371.64 
5019+280.00  2.93  5.85  10.00  58.50  1,242,313.14 
5019+300.00  2.93  5.85  10.00  58.50  1,242,254.64 
5019+320.00  2.93  5.85  10.00  58.50  1,242,196.14 
5019+340.00  2.93  5.85  10.00  58.51  1,242,137.63 
5019+360.00  2.93  5.85  10.00  58.51  1,242,079.12 
5019+380.00  2.93  5.85  10.00  58.51  1,242,020.61 
5019+400.00  2.93  5.85  10.00  58.51  1,241,962.10 
5019+420.00  2.93  5.85  10.00  58.51  1,241,903.59 
5019+440.00  2.93  5.85  10.00  58.52  1,241,845.07 
5019+450.00  2.79  5.72  5.00  28.58  1,241,816.49 
5019+450.00  2.79  5.58  0.00  0.00  1,241,816.49 
5019+450.00  0.00  2.79  0.00  0.00  1,241,816.49 
5019+460.00  0.00  0.00  5.00  0.00  1,241,816.49 
5019+478.00  0.00  0.00  9.00  0.00  1,241,816.49 
5019+478.00  0.00  0.00  0.00  0.00  1,241,816.49 
5019+478.00  2.93  2.93  0.00  0.00  1,241,816.49 
5019+480.00  2.93  5.85  1.00  5.85  1,241,810.64 
5019+500.00  2.93  5.85  10.00  58.51  1,241,752.13 
5019+520.00  2.93  5.85  10.00  58.52  1,241,693.61 
5019+540.00  2.93  5.85  10.00  58.51  1,241,635.10 

479 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5019+560.00  2.93  5.85  10.00  58.50  1,241,576.60 


5019+580.00  2.93  5.85  10.00  58.50  1,241,518.10 
5019+600.00  2.93  5.85  10.00  58.50  1,241,459.60 
5019+620.00  2.93  5.85  10.00  58.50  1,241,401.10 
5019+640.00  2.93  5.85  10.00  58.51  1,241,342.59 
5019+660.00  2.93  5.85  10.00  58.52  1,241,284.07 
5019+680.00  2.93  5.85  10.00  58.51  1,241,225.56 
5019+700.00  2.93  5.85  10.00  58.50  1,241,167.06 
5019+700.00  2.93  5.85  0.00  0.00  1,241,167.06 
5019+720.00  2.93  5.85  10.00  58.50  1,241,108.56 
5019+740.00  2.93  5.85  10.00  58.50  1,241,050.06 
5019+760.00  2.93  5.85  10.00  58.50  1,240,991.56 
5019+780.00  2.93  5.85  10.00  58.51  1,240,933.05 
5019+800.00  2.93  5.85  10.00  58.52  1,240,874.53 
5019+820.00  2.93  5.85  10.00  58.51  1,240,816.02 
5019+840.00  2.93  5.85  10.00  58.50  1,240,757.52 
5019+860.00  2.93  5.85  10.00  58.50  1,240,699.02 
5019+880.00  2.93  5.85  10.00  58.50  1,240,640.52 
5019+900.00  2.93  5.85  10.00  58.50  1,240,582.02 
5019+920.00  2.93  5.85  10.00  58.50  1,240,523.52 
5019+940.00  2.93  5.85  10.00  58.51  1,240,465.01 
5019+960.00  2.93  5.85  10.00  58.51  1,240,406.50 
5019+980.00  2.93  5.85  10.00  58.50  1,240,348.00 
5020+000.00  2.93  5.85  10.00  58.51  1,240,289.49 
5020+020.00  2.93  5.85  10.00  58.51  1,240,230.98 
5020+040.00  2.93  5.85  10.00  58.50  1,240,172.48 
5020+060.00  2.93  5.85  10.00  58.50  1,240,113.98 
5020+080.00  2.93  5.85  10.00  58.50  1,240,055.48 
5020+100.00  2.93  5.85  10.00  58.51  1,239,996.97 
5020+120.00  2.93  5.85  10.00  58.51  1,239,938.46 
5020+140.00  2.93  5.85  10.00  58.50  1,239,879.96 
5020+160.00  2.93  5.85  10.00  58.50  1,239,821.46 
5020+180.00  2.93  5.85  10.00  58.50  1,239,762.96 
5020+200.00  2.93  5.85  10.00  58.50  1,239,704.46 
5020+220.00  2.93  5.85  10.00  58.51  1,239,645.95 
5020+240.00  2.93  5.85  10.00  58.52  1,239,587.43 
5020+260.00  2.93  5.85  10.00  58.52  1,239,528.91 
5020+280.00  2.93  5.85  10.00  58.52  1,239,470.39 
5020+300.00  2.93  5.85  10.00  58.52  1,239,411.87 
5020+320.00  2.93  5.85  10.00  58.52  1,239,353.35 
5020+340.00  2.93  5.85  10.00  58.52  1,239,294.83 
5020+360.00  2.93  5.85  10.00  58.52  1,239,236.31 
5020+380.00  2.93  5.85  10.00  58.52  1,239,177.79 
5020+400.00  2.93  5.85  10.00  58.51  1,239,119.28 
5020+420.00  2.93  5.85  10.00  58.51  1,239,060.77 
5020+440.00  2.93  5.85  10.00  58.52  1,239,002.25 
5020+460.00  2.93  5.85  10.00  58.51  1,238,943.74 
5020+480.00  2.93  5.85  10.00  58.51  1,238,885.23 
5020+500.00  2.93  5.85  10.00  58.52  1,238,826.71 
5020+520.00  2.93  5.85  10.00  58.51  1,238,768.20 
5020+540.00  2.93  5.85  10.00  58.50  1,238,709.70 

480 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5020+560.00  2.93  5.85  10.00  58.50  1,238,651.20 


5020+580.00  2.93  5.85  10.00  58.51  1,238,592.69 
5020+600.00  2.93  5.85  10.00  58.51  1,238,534.18 
5020+620.00  2.93  5.85  10.00  58.50  1,238,475.68 
5020+640.00  2.93  5.85  10.00  58.50  1,238,417.18 
5020+660.00  2.93  5.85  10.00  58.50  1,238,358.68 
5020+680.00  2.93  5.85  10.00  58.51  1,238,300.17 
5020+700.00  2.93  5.85  10.00  58.51  1,238,241.66 
5020+720.00  2.93  5.85  10.00  58.51  1,238,183.15 
5020+740.00  2.93  5.85  10.00  58.51  1,238,124.64 
5020+760.00  2.93  5.85  10.00  58.50  1,238,066.14 
5020+780.00  2.93  5.85  10.00  58.51  1,238,007.63 
5020+800.00  2.93  5.85  10.00  58.51  1,237,949.12 
5020+820.00  2.93  5.85  10.00  58.50  1,237,890.62 
5020+840.00  2.93  5.85  10.00  58.50  1,237,832.12 
5020+860.00  2.93  5.85  10.00  58.50  1,237,773.62 
5020+880.00  2.93  5.85  10.00  58.51  1,237,715.11 
5020+900.00  2.93  5.85  10.00  58.51  1,237,656.60 
5020+920.00  2.93  5.85  10.00  58.50  1,237,598.10 
5020+940.00  2.93  5.85  10.00  58.51  1,237,539.59 
5020+960.00  2.93  5.85  10.00  58.51  1,237,481.08 
5020+980.00  2.93  5.85  10.00  58.51  1,237,422.57 
5021+000.00  2.93  5.85  10.00  58.51  1,237,364.06 
5021+020.00  2.93  5.85  10.00  58.50  1,237,305.56 
5021+040.00  2.93  5.85  10.00  58.50  1,237,247.06 
5021+060.00  2.93  5.85  10.00  58.50  1,237,188.56 
5021+080.00  2.93  5.85  10.00  58.51  1,237,130.05 
5021+100.00  2.93  5.85  10.00  58.51  1,237,071.54 
5021+120.00  2.93  5.85  10.00  58.51  1,237,013.03 
5021+140.00  2.93  5.85  10.00  58.51  1,236,954.52 
5021+160.00  2.93  5.85  10.00  58.51  1,236,896.01 
5021+180.00  2.93  5.85  10.00  58.51  1,236,837.50 
5021+200.00  2.93  5.85  10.00  58.51  1,236,778.99 
5021+220.00  2.93  5.85  10.00  58.51  1,236,720.48 
5021+240.00  2.93  5.85  10.00  58.51  1,236,661.97 
5021+260.00  2.93  5.85  10.00  58.51  1,236,603.46 
5021+280.00  2.93  5.85  10.00  58.51  1,236,544.95 
5021+300.00  2.93  5.85  10.00  58.51  1,236,486.44 
5021+320.00  2.93  5.85  10.00  58.51  1,236,427.93 
5021+340.00  2.93  5.85  10.00  58.52  1,236,369.41 
5021+360.00  2.93  5.85  10.00  58.52  1,236,310.89 
5021+380.00  2.93  5.85  10.00  58.52  1,236,252.37 
5021+400.00  2.93  5.85  10.00  58.51  1,236,193.86 
5021+420.00  2.93  5.85  10.00  58.51  1,236,135.35 
5021+440.00  2.93  5.85  10.00  58.51  1,236,076.84 
5021+460.00  2.93  5.85  10.00  58.50  1,236,018.34 
5021+480.00  2.93  5.85  10.00  58.51  1,235,959.83 
5021+500.00  2.93  5.85  10.00  58.51  1,235,901.32 
5021+520.00  2.93  5.85  10.00  58.50  1,235,842.82 
5021+540.00  2.93  5.85  10.00  58.50  1,235,784.32 
5021+560.00  2.93  5.85  10.00  58.51  1,235,725.81 

481 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5021+560.00  2.93  5.85  0.00  0.00  1,235,725.81 


5021+580.00  2.93  5.85  10.00  58.51  1,235,667.30 
5021+600.00  2.93  5.85  10.00  58.51  1,235,608.79 
5021+620.00  2.93  5.85  10.00  58.51  1,235,550.28 
5021+640.00  2.93  5.85  10.00  58.50  1,235,491.78 
5021+660.00  2.93  5.85  10.00  58.50  1,235,433.28 
5021+680.00  2.93  5.85  10.00  58.50  1,235,374.78 
5021+700.00  2.93  5.85  10.00  58.50  1,235,316.28 
5021+720.00  2.93  5.85  10.00  58.51  1,235,257.77 
5021+740.00  2.93  5.85  10.00  58.52  1,235,199.25 
5021+760.00  2.93  5.85  10.00  58.51  1,235,140.74 
5021+780.00  2.93  5.85  10.00  58.51  1,235,082.23 
5021+800.00  2.93  5.85  10.00  58.52  1,235,023.71 
5021+820.00  2.93  5.85  10.00  58.52  1,234,965.19 
5021+840.00  2.93  5.85  10.00  58.51  1,234,906.68 
5021+860.00  2.93  5.85  10.00  58.50  1,234,848.18 
5021+880.00  2.93  5.85  10.00  58.50  1,234,789.68 
5021+900.00  2.93  5.85  10.00  58.50  1,234,731.18 
5021+920.00  2.93  5.85  10.00  58.50  1,234,672.68 
5021+920.00  2.93  5.85  0.00  0.00  1,234,672.68 
5021+940.00  2.93  5.85  10.00  58.50  1,234,614.18 
5021+960.00  2.93  5.85  10.00  58.50  1,234,555.68 
5021+980.00  2.93  5.85  10.00  58.50  1,234,497.18 
5022+000.00  2.93  5.85  10.00  58.50  1,234,438.68 
5022+020.00  2.93  5.85  10.00  58.50  1,234,380.18 
5022+040.00  2.93  5.85  10.00  58.50  1,234,321.68 
5022+060.00  2.93  5.85  10.00  58.50  1,234,263.18 
5022+080.00  2.93  5.85  10.00  58.51  1,234,204.67 
5022+100.00  2.93  5.85  10.00  58.52  1,234,146.15 
5022+120.00  2.93  5.85  10.00  58.52  1,234,087.63 
5022+140.00  2.93  5.85  10.00  58.52  1,234,029.11 
5022+160.00  2.93  5.85  10.00  58.52  1,233,970.59 
5022+180.00  2.93  5.85  10.00  58.52  1,233,912.07 
5022+200.00  2.93  5.85  10.00  58.51  1,233,853.56 
5022+220.00  2.93  5.85  10.00  58.50  1,233,795.06 
5022+240.00  2.93  5.85  10.00  58.51  1,233,736.55 
5022+260.00  2.93  5.85  10.00  58.51  1,233,678.04 
5022+280.00  2.93  5.85  10.00  58.50  1,233,619.54 
5022+280.00  2.93  5.85  0.00  0.00  1,233,619.54 
5022+300.00  2.93  5.85  10.00  58.51  1,233,561.03 
5022+320.00  2.93  5.85  10.00  58.51  1,233,502.52 
5022+340.00  2.93  5.85  10.00  58.50  1,233,444.02 
5022+360.00  2.93  5.85  10.00  58.50  1,233,385.52 
5022+380.00  2.93  5.85  10.00  58.51  1,233,327.01 
5022+400.00  2.93  5.85  10.00  58.51  1,233,268.50 
5022+420.00  2.93  5.85  10.00  58.50  1,233,210.00 
5022+440.00  2.93  5.85  10.00  58.50  1,233,151.50 
5022+460.00  2.93  5.85  10.00  58.50  1,233,093.00 
5022+480.00  2.93  5.85  10.00  58.51  1,233,034.49 
5022+490.00  2.93  5.85  5.00  29.26  1,233,005.24 
5022+490.00  2.93  5.85  0.00  0.00  1,233,005.24 

482 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5022+500.00  2.93  5.85  5.00  29.25  1,232,975.99 


5022+520.00  2.93  5.85  10.00  58.50  1,232,917.49 
5022+540.00  2.93  5.85  10.00  58.50  1,232,858.99 
5022+560.00  2.93  5.85  10.00  58.51  1,232,800.48 
5022+580.00  2.93  5.85  10.00  58.51  1,232,741.97 
5022+600.00  2.93  5.85  10.00  58.51  1,232,683.46 
5022+620.00  2.93  5.85  10.00  58.51  1,232,624.95 
5022+640.00  2.93  5.85  10.00  58.51  1,232,566.44 
5022+660.00  2.93  5.85  10.00  58.51  1,232,507.93 
5022+680.00  2.93  5.85  10.00  58.51  1,232,449.42 
5022+685.75  2.93  5.85  2.87  16.81  1,232,432.61 
5022+700.00  2.93  5.85  7.13  41.70  1,232,390.91 
5022+715.75  2.93  5.85  7.87  46.05  1,232,344.85 
5022+720.00  2.93  5.85  2.13  12.45  1,232,332.40 
5022+740.00  2.93  5.85  10.00  58.51  1,232,273.89 
5022+760.00  2.93  5.85  10.00  58.51  1,232,215.38 
5022+780.00  2.93  5.85  10.00  58.51  1,232,156.87 
5022+800.00  2.93  5.85  10.00  58.51  1,232,098.36 
5022+800.10  2.93  5.85  0.05  0.30  1,232,098.07 
5022+820.00  2.93  5.85  9.95  58.20  1,232,039.86 
5022+830.10  2.93  5.85  5.05  29.55  1,232,010.32 
5022+840.00  2.93  5.85  4.95  28.96  1,231,981.36 
5022+860.00  2.93  5.85  10.00  58.51  1,231,922.85 
5022+880.00  2.93  5.85  10.00  58.51  1,231,864.34 
5022+900.00  2.93  5.85  10.00  58.51  1,231,805.83 
5022+920.00  2.93  5.85  10.00  58.51  1,231,747.32 
5022+940.00  2.93  5.85  10.00  58.51  1,231,688.81 
5022+960.00  2.93  5.85  10.00  58.51  1,231,630.30 
5022+980.00  2.93  5.85  10.00  58.51  1,231,571.79 
5023+000.00  2.93  5.85  10.00  58.51  1,231,513.28 
5023+020.00  2.93  5.85  10.00  58.51  1,231,454.77 
5023+040.00  2.93  5.85  10.00  58.51  1,231,396.26 
5023+060.00  2.93  5.85  10.00  58.51  1,231,337.75 
5023+080.00  2.93  5.85  10.00  58.51  1,231,279.24 
5023+100.00  2.93  5.85  10.00  58.51  1,231,220.73 
5023+100.00  2.93  5.85  0.00  0.00  1,231,220.73 
5023+120.00  2.93  5.85  10.00  58.50  1,231,162.23 
5023+140.00  2.93  5.85  10.00  58.50  1,231,103.73 
5023+160.00  2.93  5.85  10.00  58.50  1,231,045.23 
5023+180.00  2.93  5.85  10.00  58.50  1,230,986.73 
5023+200.00  2.93  5.85  10.00  58.50  1,230,928.23 
5023+220.00  2.93  5.85  10.00  58.50  1,230,869.73 
5023+220.00  2.93  5.85  0.00  0.00  1,230,869.73 
5023+240.00  2.93  5.85  10.00  58.50  1,230,811.23 
5023+260.00  2.93  5.85  10.00  58.50  1,230,752.73 
5023+280.00  2.93  5.85  10.00  58.50  1,230,694.23 
5023+300.00  2.93  5.85  10.00  58.50  1,230,635.73 
5023+320.00  2.93  5.85  10.00  58.51  1,230,577.22 
5023+340.00  2.93  5.85  10.00  58.51  1,230,518.71 
5023+360.00  2.93  5.85  10.00  58.50  1,230,460.21 
5023+380.00  2.93  5.85  10.00  58.51  1,230,401.70 

483 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5023+400.00  2.93  5.85  10.00  58.51  1,230,343.19 


5023+420.00  2.93  5.85  10.00  58.50  1,230,284.69 
5023+440.00  2.93  5.85  10.00  58.50  1,230,226.19 
5023+460.00  2.93  5.85  10.00  58.50  1,230,167.69 
5023+480.00  2.93  5.85  10.00  58.51  1,230,109.18 
5023+500.00  2.93  5.85  10.00  58.51  1,230,050.67 
5023+520.00  2.93  5.85  10.00  58.50  1,229,992.17 
5023+540.00  2.93  5.85  10.00  58.50  1,229,933.67 
5023+560.00  2.93  5.85  10.00  58.50  1,229,875.17 
5023+580.00  2.93  5.85  10.00  58.51  1,229,816.66 
5023+600.00  2.93  5.85  10.00  58.52  1,229,758.14 
5023+620.00  2.93  5.85  10.00  58.52  1,229,699.62 
5023+640.00  2.93  5.85  10.00  58.52  1,229,641.10 
5023+660.00  2.93  5.85  10.00  58.52  1,229,582.58 
5023+680.00  2.93  5.85  10.00  58.52  1,229,524.06 
5023+700.00  2.93  5.85  10.00  58.52  1,229,465.54 
5023+720.00  2.93  5.85  10.00  58.52  1,229,407.02 
5023+740.00  2.93  5.85  10.00  58.52  1,229,348.50 
5023+760.00  2.93  5.85  10.00  58.52  1,229,289.98 
5023+770.00  2.93  5.85  5.00  29.26  1,229,260.72 
5023+770.00  2.93  5.85  0.00  0.00  1,229,260.72 
5023+780.00  2.93  5.85  5.00  29.26  1,229,231.46 
5023+800.00  2.93  5.85  10.00  58.52  1,229,172.94 
5023+820.00  2.93  5.85  10.00  58.52  1,229,114.42 
5023+840.00  2.93  5.85  10.00  58.52  1,229,055.90 
5023+860.00  2.93  5.85  10.00  58.52  1,228,997.38 
5023+880.00  2.93  5.85  10.00  58.52  1,228,938.86 
5023+900.00  2.93  5.85  10.00  58.52  1,228,880.34 
5023+900.00  2.93  5.85  0.00  0.00  1,228,880.34 
5023+920.00  2.93  5.85  10.00  58.52  1,228,821.82 
5023+940.00  2.93  5.85  10.00  58.52  1,228,763.30 
5023+960.00  2.93  5.85  10.00  58.52  1,228,704.78 
5023+980.00  2.93  5.85  10.00  58.52  1,228,646.26 
5024+000.00  2.93  5.85  10.00  58.52  1,228,587.74 
5024+007.22  2.93  5.85  3.61  21.13  1,228,566.60 
5024+020.00  2.93  5.85  6.39  37.39  1,228,529.22 
5024+040.00  2.93  5.85  10.00  58.52  1,228,470.70 
5024+060.00  2.93  5.85  10.00  58.52  1,228,412.18 
5024+080.00  2.93  5.85  10.00  58.51  1,228,353.67 
5024+100.00  2.93  5.85  10.00  58.50  1,228,295.17 
5024+120.00  2.93  5.85  10.00  58.50  1,228,236.67 
5024+137.22  2.93  5.85  8.61  50.39  1,228,186.28 
5024+140.00  2.93  5.85  1.39  8.13  1,228,178.16 
5024+160.00  2.93  5.85  10.00  58.52  1,228,119.64 
5024+180.00  2.93  5.85  10.00  58.52  1,228,061.12 
5024+200.00  2.93  5.85  10.00  58.52  1,228,002.60 
5024+220.00  2.93  5.85  10.00  58.52  1,227,944.08 
5024+240.00  2.93  5.85  10.00  58.52  1,227,885.56 
5024+250.00  2.93  5.85  5.00  29.26  1,227,856.30 
5024+260.00  2.93  5.85  5.00  29.26  1,227,827.04 
5024+280.00  2.93  5.85  10.00  58.52  1,227,768.52 

484 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5024+300.00  2.93  5.85  10.00  58.52  1,227,710.00 


5024+320.00  2.93  5.85  10.00  58.52  1,227,651.48 
5024+340.00  2.93  5.85  10.00  58.52  1,227,592.96 
5024+360.00  2.93  5.85  10.00  58.52  1,227,534.44 
5024+380.00  2.93  5.85  10.00  58.52  1,227,475.92 
5024+400.00  2.93  5.85  10.00  58.52  1,227,417.40 
5024+420.00  2.93  5.85  10.00  58.52  1,227,358.88 
5024+440.00  2.93  5.85  10.00  58.52  1,227,300.36 
5024+460.00  2.93  5.85  10.00  58.52  1,227,241.84 
5024+480.00  2.93  5.85  10.00  58.52  1,227,183.32 
5024+500.00  2.93  5.85  10.00  58.52  1,227,124.80 
5024+515.53  2.93  5.85  7.76  45.43  1,227,079.37 
5024+520.00  3.26  6.19  2.24  13.85  1,227,065.53 
5024+535.53  4.43  7.69  7.76  59.70  1,227,005.82 
5024+540.00  4.43  8.86  2.24  19.82  1,226,986.00 
5024+560.00  4.43  8.86  10.00  88.58  1,226,897.42 
5024+580.00  4.43  8.86  10.00  88.58  1,226,808.84 
5024+588.65  4.43  8.86  4.32  38.30  1,226,770.54 
5024+600.00  4.43  8.86  5.68  50.28  1,226,720.26 
5024+620.00  4.43  8.86  10.00  88.58  1,226,631.68 
5024+640.00  4.43  8.86  10.00  88.58  1,226,543.10 
5024+640.00  4.43  8.86  0.00  0.00  1,226,543.10 
5024+660.00  4.43  8.86  10.00  88.58  1,226,454.52 
5024+680.00  4.43  8.86  10.00  88.58  1,226,365.94 
5024+700.00  4.43  8.86  10.00  88.58  1,226,277.36 
5024+718.65  4.43  8.86  9.32  82.59  1,226,194.77 
5024+720.00  4.43  8.86  0.68  5.99  1,226,188.78 
5024+740.00  4.43  8.86  10.00  88.58  1,226,100.20 
5024+760.00  4.43  8.86  10.00  88.58  1,226,011.62 
5024+780.00  4.43  8.86  10.00  88.58  1,225,923.04 
5024+800.00  4.43  8.86  10.00  88.58  1,225,834.46 
5024+815.00  4.43  8.86  7.50  66.44  1,225,768.03 
5024+820.00  4.43  8.86  2.50  22.15  1,225,745.88 
5024+825.00  4.43  8.86  2.50  22.15  1,225,723.74 
5024+835.00  4.45  8.88  5.00  44.40  1,225,679.34 
5024+840.00  4.49  8.94  2.50  22.35  1,225,657.00 
5024+845.00  4.53  9.01  2.50  22.54  1,225,634.46 
5024+855.00  4.66  9.19  5.00  45.94  1,225,588.53 
5024+860.00  4.76  9.42  2.50  23.54  1,225,564.99 
5024+865.00  4.85  9.60  2.50  24.01  1,225,540.98 
5024+875.00  5.05  9.90  5.00  49.49  1,225,491.49 
5024+880.00  5.15  10.20  2.50  25.50  1,225,465.99 
5024+885.00  5.25  10.40  2.50  26.00  1,225,440.00 
5024+895.00  5.45  10.70  5.00  53.50  1,225,386.50 
5024+900.00  5.55  11.00  2.50  27.49  1,225,359.01 
5024+905.00  5.65  11.19  2.50  27.98  1,225,331.03 
5024+915.00  5.80  11.44  5.00  57.22  1,225,273.81 
5024+920.00  5.85  11.64  2.50  29.11  1,225,244.70 
5024+925.00  5.89  11.74  2.50  29.34  1,225,215.36 
5024+935.00  5.93  11.82  5.00  59.10  1,225,156.27 
5024+940.00  5.93  11.86  2.50  29.64  1,225,126.62 

485 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5024+945.00  5.93  11.86  2.50  29.64  1,225,096.98 


5024+955.00  5.93  11.86  5.00  59.28  1,225,037.70 
5024+960.00  5.93  11.86  2.50  29.64  1,225,008.06 
5024+980.00  5.93  11.86  10.00  118.56  1,224,889.50 
5025+000.00  5.93  11.86  10.00  118.56  1,224,770.94 
5025+000.00  5.93  11.86  0.00  0.00  1,224,770.94 
5025+020.00  5.93  11.86  10.00  118.56  1,224,652.38 
5025+040.00  5.93  11.86  10.00  118.56  1,224,533.82 
5025+060.00  5.93  11.86  10.00  118.56  1,224,415.26 
5025+080.00  5.93  11.86  10.00  118.56  1,224,296.70 
5025+100.00  5.93  11.86  10.00  118.56  1,224,178.14 
5025+120.00  5.93  11.86  10.00  118.56  1,224,059.58 
5025+140.00  5.93  11.86  10.00  118.56  1,223,941.02 
5025+160.00  5.93  11.86  10.00  118.56  1,223,822.46 
5025+180.00  5.93  11.86  10.00  118.56  1,223,703.90 
5025+200.00  5.93  11.86  10.00  118.56  1,223,585.34 
5025+220.00  5.93  11.86  10.00  118.56  1,223,466.78 
5025+240.00  5.93  11.86  10.00  118.56  1,223,348.22 
5025+260.00  5.93  11.86  10.00  118.56  1,223,229.66 
5025+270.00  5.93  11.86  5.00  59.28  1,223,170.38 
5025+280.00  5.92  11.84  5.00  59.22  1,223,111.17 
5025+290.00  5.85  11.76  5.00  58.81  1,223,052.36 
5025+300.00  5.72  11.57  5.00  57.83  1,222,994.53 
5025+310.00  5.54  11.26  5.00  56.29  1,222,938.25 
5025+320.00  5.34  10.88  5.00  54.38  1,222,883.87 
5025+330.00  5.14  10.48  5.00  52.38  1,222,831.50 
5025+340.00  4.94  10.07  5.00  50.37  1,222,781.13 
5025+350.00  4.74  9.68  5.00  48.38  1,222,732.75 
5025+360.00  4.58  9.32  5.00  46.59  1,222,686.17 
5025+370.00  4.48  9.06  5.00  45.28  1,222,640.89 
5025+380.00  4.43  8.91  5.00  44.54  1,222,596.36 
5025+390.00  4.43  8.86  5.00  44.30  1,222,552.06 
5025+400.00  4.43  8.86  5.00  44.29  1,222,507.77 
5025+420.00  4.43  8.86  10.00  88.58  1,222,419.19 
5025+440.00  4.43  8.86  10.00  88.58  1,222,330.61 
5025+460.00  4.43  8.86  10.00  88.58  1,222,242.03 
5025+480.00  4.43  8.86  10.00  88.58  1,222,153.45 
5025+500.00  4.43  8.86  10.00  88.58  1,222,064.87 
5025+520.00  4.43  8.86  10.00  88.58  1,221,976.29 
5025+521.36  4.43  8.86  0.68  6.01  1,221,970.27 
5025+540.00  3.03  7.46  9.32  69.50  1,221,900.77 
5025+541.36  2.93  5.95  0.68  4.04  1,221,896.73 
5025+550.36  2.93  5.85  4.50  26.34  1,221,870.40 
5025+560.00  2.93  5.85  4.82  28.20  1,221,842.19 
5025+580.00  2.93  5.85  10.00  58.50  1,221,783.69 
5025+600.00  2.93  5.85  10.00  58.51  1,221,725.18 
5025+620.00  2.93  5.85  10.00  58.52  1,221,666.66 
5025+640.00  2.93  5.85  10.00  58.52  1,221,608.14 
5025+640.36  2.93  5.85  0.18  1.05  1,221,607.09 
5025+660.00  2.93  5.85  9.82  57.45  1,221,549.64 
5025+680.00  2.93  5.85  10.00  58.50  1,221,491.14 

486 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5025+700.00  2.93  5.85  10.00  58.50  1,221,432.64 


5025+720.00  2.93  5.85  10.00  58.51  1,221,374.13 
5025+733.68  2.93  5.85  6.84  40.02  1,221,334.11 
5025+740.00  2.93  5.85  3.16  18.50  1,221,315.61 
5025+760.00  2.93  5.85  10.00  58.51  1,221,257.10 
5025+780.00  2.93  5.85  10.00  58.50  1,221,198.60 
5025+800.00  2.93  5.85  10.00  58.50  1,221,140.10 
5025+820.00  2.93  5.85  10.00  58.50  1,221,081.60 
5025+823.68  2.93  5.85  1.84  10.76  1,221,070.84 
5025+840.00  2.93  5.85  8.16  47.74  1,221,023.10 
5025+860.00  2.93  5.85  10.00  58.50  1,220,964.60 
5025+880.00  2.93  5.85  10.00  58.51  1,220,906.09 
5025+882.88  2.93  5.85  1.44  8.44  1,220,897.66 
5025+900.00  2.93  5.85  8.56  50.08  1,220,847.58 
5025+920.00  2.93  5.85  10.00  58.50  1,220,789.08 
5025+940.00  2.93  5.85  10.00  58.51  1,220,730.57 
5025+960.00  2.93  5.85  10.00  58.51  1,220,672.06 
5025+980.00  2.93  5.85  10.00  58.50  1,220,613.56 
5026+000.00  2.93  5.85  10.00  58.51  1,220,555.05 
5026+020.00  2.93  5.85  10.00  58.51  1,220,496.54 
5026+040.00  2.93  5.85  10.00  58.50  1,220,438.04 
5026+060.00  2.93  5.85  10.00  58.51  1,220,379.53 
5026+080.00  2.93  5.85  10.00  58.51  1,220,321.02 
5026+100.00  2.93  5.85  10.00  58.50  1,220,262.52 
5026+100.00  2.93  5.85  0.00  0.00  1,220,262.52 
5026+120.00  2.93  5.85  10.00  58.51  1,220,204.01 
5026+140.00  2.93  5.85  10.00  58.52  1,220,145.49 
5026+160.00  2.93  5.85  10.00  58.52  1,220,086.97 
5026+180.00  2.93  5.85  10.00  58.51  1,220,028.46 
5026+200.00  2.93  5.85  10.00  58.50  1,219,969.96 
5026+220.00  2.93  5.85  10.00  58.50  1,219,911.46 
5026+240.00  2.93  5.85  10.00  58.51  1,219,852.95 
5026+260.00  2.93  5.85  10.00  58.52  1,219,794.43 
5026+280.00  2.93  5.85  10.00  58.52  1,219,735.91 
5026+300.00  2.93  5.85  10.00  58.52  1,219,677.39 
5026+320.00  2.93  5.85  10.00  58.52  1,219,618.87 
5026+340.00  2.93  5.85  10.00  58.52  1,219,560.35 
5026+360.00  2.93  5.85  10.00  58.52  1,219,501.83 
5026+380.00  2.93  5.85  10.00  58.52  1,219,443.31 
5026+400.00  2.93  5.85  10.00  58.52  1,219,384.79 
5026+420.00  2.93  5.85  10.00  58.52  1,219,326.27 
5026+440.00  2.93  5.85  10.00  58.52  1,219,267.75 
5026+460.00  2.93  5.85  10.00  58.52  1,219,209.23 
5026+480.00  2.93  5.85  10.00  58.52  1,219,150.71 
5026+500.00  2.93  5.85  10.00  58.52  1,219,092.19 
5026+520.00  2.93  5.85  10.00  58.52  1,219,033.67 
5026+540.00  2.93  5.85  10.00  58.52  1,218,975.15 
5026+560.00  2.93  5.85  10.00  58.52  1,218,916.63 
5026+580.00  2.93  5.85  10.00  58.52  1,218,858.11 
5026+600.00  2.93  5.85  10.00  58.52  1,218,799.59 
5026+620.00  2.93  5.85  10.00  58.52  1,218,741.07 

487 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5026+623.09  2.93  5.85  1.54  9.03  1,218,732.04 


5026+640.00  2.93  5.85  8.46  49.48  1,218,682.56 
5026+660.00  2.93  5.85  10.00  58.50  1,218,624.06 
5026+680.00  2.93  5.85  10.00  58.51  1,218,565.55 
5026+683.09  2.93  5.85  1.54  9.03  1,218,556.52 
5026+700.00  2.93  5.85  8.46  49.49  1,218,507.03 
5026+720.00  2.93  5.85  10.00  58.52  1,218,448.51 
5026+740.00  2.93  5.85  10.00  58.52  1,218,389.99 
5026+760.00  2.93  5.85  10.00  58.52  1,218,331.47 
5026+771.35  2.93  5.85  5.68  33.21  1,218,298.25 
5026+780.00  2.93  5.85  4.32  25.31  1,218,272.95 
5026+800.00  2.93  5.85  10.00  58.51  1,218,214.44 
5026+820.00  2.93  5.85  10.00  58.50  1,218,155.94 
5026+831.35  2.93  5.85  5.68  33.21  1,218,122.73 
5026+840.00  2.93  5.85  4.32  25.31  1,218,097.42 
5026+860.00  2.93  5.85  10.00  58.52  1,218,038.90 
5026+880.00  2.93  5.85  10.00  58.52  1,217,980.38 
5026+900.00  2.93  5.85  10.00  58.52  1,217,921.86 
5026+920.00  2.93  5.85  10.00  58.52  1,217,863.34 
5026+940.00  2.93  5.85  10.00  58.52  1,217,804.82 
5026+960.00  2.93  5.85  10.00  58.52  1,217,746.30 
5026+980.00  2.93  5.85  10.00  58.52  1,217,687.78 
5027+000.00  2.93  5.85  10.00  58.51  1,217,629.27 
5027+020.00  2.93  5.85  10.00  58.51  1,217,570.76 
5027+020.00  2.93  5.85  0.00  0.00  1,217,570.76 
5027+040.00  2.93  5.85  10.00  58.51  1,217,512.25 
5027+060.00  2.93  5.85  10.00  58.50  1,217,453.75 
5027+080.00  2.93  5.85  10.00  58.50  1,217,395.25 
5027+100.00  2.93  5.85  10.00  58.50  1,217,336.75 
5027+120.00  2.93  5.85  10.00  58.50  1,217,278.25 
5027+140.00  2.93  5.85  10.00  58.51  1,217,219.74 
5027+160.00  2.93  5.85  10.00  58.51  1,217,161.23 
5027+180.00  2.93  5.85  10.00  58.50  1,217,102.73 
5027+200.00  2.93  5.85  10.00  58.51  1,217,044.22 
5027+220.00  2.93  5.85  10.00  58.51  1,216,985.71 
5027+240.00  2.93  5.85  10.00  58.51  1,216,927.20 
5027+260.00  2.93  5.85  10.00  58.51  1,216,868.69 
5027+280.00  2.93  5.85  10.00  58.50  1,216,810.19 
5027+300.00  2.93  5.85  10.00  58.50  1,216,751.69 
5027+320.00  2.93  5.85  10.00  58.50  1,216,693.19 
5027+340.00  2.93  5.85  10.00  58.51  1,216,634.68 
5027+360.00  2.93  5.85  10.00  58.52  1,216,576.16 
5027+380.00  2.93  5.85  10.00  58.51  1,216,517.65 
5027+400.00  2.93  5.85  10.00  58.50  1,216,459.15 
5027+420.00  2.93  5.85  10.00  58.50  1,216,400.65 
5027+440.00  2.93  5.85  10.00  58.51  1,216,342.14 
5027+460.00  2.93  5.85  10.00  58.51  1,216,283.63 
5027+480.00  2.93  5.85  10.00  58.50  1,216,225.13 
5027+500.00  2.93  5.85  10.00  58.51  1,216,166.62 
5027+520.00  2.93  5.85  10.00  58.51  1,216,108.11 
5027+540.00  2.93  5.85  10.00  58.50  1,216,049.61 

488 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5027+560.00  2.93  5.85  10.00  58.51  1,215,991.10 


5027+580.00  2.93  5.85  10.00  58.51  1,215,932.59 
5027+600.00  2.93  5.85  10.00  58.50  1,215,874.09 
5027+620.00  2.93  5.85  10.00  58.51  1,215,815.58 
5027+640.00  2.93  5.85  10.00  58.51  1,215,757.07 
5027+660.00  2.93  5.85  10.00  58.50  1,215,698.57 
5027+680.00  2.93  5.85  10.00  58.51  1,215,640.06 
5027+700.00  2.93  5.85  10.00  58.51  1,215,581.55 
5027+720.00  2.93  5.85  10.00  58.50  1,215,523.05 
5027+740.00  2.93  5.85  10.00  58.51  1,215,464.54 
5027+750.00  2.93  5.85  5.00  29.26  1,215,435.29 
5027+750.00  2.93  5.85  0.00  0.00  1,215,435.29 
5027+760.00  2.93  5.85  5.00  29.25  1,215,406.04 
5027+780.00  2.93  5.85  10.00  58.50  1,215,347.54 
5027+800.00  2.93  5.85  10.00  58.51  1,215,289.03 
5027+820.00  2.93  5.85  10.00  58.51  1,215,230.52 
5027+840.00  2.93  5.85  10.00  58.50  1,215,172.02 
5027+860.00  2.93  5.85  10.00  58.51  1,215,113.51 
5027+880.00  2.93  5.85  10.00  58.51  1,215,055.00 
5027+900.00  2.93  5.85  10.00  58.50  1,214,996.50 
5027+920.00  2.93  5.85  10.00  58.51  1,214,937.99 
5027+940.00  2.93  5.85  10.00  58.51  1,214,879.48 
5027+960.00  2.93  5.85  10.00  58.50  1,214,820.98 
5027+980.00  2.93  5.85  10.00  58.50  1,214,762.48 
5028+000.00  2.93  5.85  10.00  58.50  1,214,703.98 
5028+020.00  2.93  5.85  10.00  58.50  1,214,645.48 
5028+040.00  2.93  5.85  10.00  58.51  1,214,586.97 
5028+060.00  2.93  5.85  10.00  58.51  1,214,528.46 
5028+080.00  2.93  5.85  10.00  58.50  1,214,469.96 
5028+100.00  2.93  5.85  10.00  58.51  1,214,411.45 
5028+120.00  2.93  5.85  10.00  58.51  1,214,352.94 
5028+140.00  2.93  5.85  10.00  58.50  1,214,294.44 
5028+160.00  2.93  5.85  10.00  58.51  1,214,235.93 
5028+180.00  2.93  5.85  10.00  58.51  1,214,177.42 
5028+200.00  2.93  5.85  10.00  58.50  1,214,118.92 
5028+220.00  2.93  5.85  10.00  58.51  1,214,060.41 
5028+240.00  2.93  5.85  10.00  58.51  1,214,001.90 
5028+260.00  2.93  5.85  10.00  58.50  1,213,943.40 
5028+280.00  2.93  5.85  10.00  58.51  1,213,884.89 
5028+300.00  2.93  5.85  10.00  58.51  1,213,826.38 
5028+320.00  2.93  5.85  10.00  58.50  1,213,767.88 
5028+340.00  2.93  5.85  10.00  58.51  1,213,709.37 
5028+360.00  2.93  5.85  10.00  58.51  1,213,650.86 
5028+380.00  2.93  5.85  10.00  58.50  1,213,592.36 
5028+400.00  2.93  5.85  10.00  58.51  1,213,533.85 
5028+420.00  2.93  5.85  10.00  58.52  1,213,475.33 
5028+440.00  2.93  5.85  10.00  58.51  1,213,416.82 
5028+460.00  2.93  5.85  10.00  58.51  1,213,358.31 
5028+480.00  2.93  5.85  10.00  58.51  1,213,299.80 
5028+490.00  2.93  5.85  5.00  29.26  1,213,270.54 
5028+490.00  2.93  5.85  0.00  0.00  1,213,270.54 

489 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5028+500.00  2.93  5.85  5.00  29.26  1,213,241.29 


5028+520.00  2.93  5.85  10.00  58.51  1,213,182.78 
5028+540.00  2.93  5.85  10.00  58.51  1,213,124.27 
5028+560.00  2.93  5.85  10.00  58.50  1,213,065.77 
5028+580.00  2.93  5.85  10.00  58.51  1,213,007.26 
5028+600.00  2.93  5.85  10.00  58.51  1,212,948.75 
5028+620.00  2.93  5.85  10.00  58.50  1,212,890.25 
5028+640.00  2.93  5.85  10.00  58.50  1,212,831.75 
5028+660.00  2.93  5.85  10.00  58.51  1,212,773.24 
5028+680.00  2.93  5.85  10.00  58.52  1,212,714.72 
5028+700.00  2.93  5.85  10.00  58.51  1,212,656.21 
5028+720.00  2.93  5.85  10.00  58.50  1,212,597.71 
5028+740.00  2.93  5.85  10.00  58.50  1,212,539.21 
5028+760.00  2.93  5.85  10.00  58.50  1,212,480.71 
5028+780.00  2.93  5.85  10.00  58.50  1,212,422.21 
5028+800.00  2.93  5.85  10.00  58.50  1,212,363.71 
5028+820.00  2.93  5.85  10.00  58.51  1,212,305.20 
5028+840.00  2.93  5.85  10.00  58.52  1,212,246.68 
5028+860.00  2.93  5.85  10.00  58.52  1,212,188.16 
5028+880.00  2.93  5.85  10.00  58.51  1,212,129.65 
5028+900.00  2.93  5.85  10.00  58.50  1,212,071.15 
5028+920.00  2.93  5.85  10.00  58.50  1,212,012.65 
5028+920.00  2.93  5.85  0.00  0.00  1,212,012.65 
5028+940.00  2.93  5.85  10.00  58.51  1,211,954.14 
5028+960.00  2.93  5.85  10.00  58.52  1,211,895.62 
5028+980.00  2.93  5.85  10.00  58.51  1,211,837.11 
5029+000.00  2.93  5.85  10.00  58.50  1,211,778.61 
5029+020.00  2.93  5.85  10.00  58.50  1,211,720.11 
5029+040.00  2.93  5.85  10.00  58.50  1,211,661.61 
5029+060.00  2.93  5.85  10.00  58.50  1,211,603.11 
5029+080.00  2.93  5.85  10.00  58.50  1,211,544.61 
5029+100.00  2.93  5.85  10.00  58.50  1,211,486.11 
5029+120.00  2.93  5.85  10.00  58.50  1,211,427.61 
5029+140.00  2.93  5.85  10.00  58.50  1,211,369.11 
5029+160.00  2.93  5.85  10.00  58.50  1,211,310.61 
5029+180.00  2.93  5.85  10.00  58.50  1,211,252.11 
5029+200.00  2.93  5.85  10.00  58.50  1,211,193.61 
5029+220.00  2.93  5.85  10.00  58.50  1,211,135.11 
5029+240.00  2.93  5.85  10.00  58.50  1,211,076.61 
5029+260.00  2.93  5.85  10.00  58.50  1,211,018.11 
5029+280.00  2.93  5.85  10.00  58.50  1,210,959.61 
5029+285.11  2.93  5.85  2.56  14.95  1,210,944.66 
5029+300.00  2.93  5.85  7.44  43.55  1,210,901.11 
5029+320.00  2.93  5.85  10.00  58.50  1,210,842.61 
5029+340.00  2.93  5.85  10.00  58.50  1,210,784.11 
5029+360.00  2.93  5.85  10.00  58.50  1,210,725.61 
5029+380.00  2.93  5.85  10.00  58.50  1,210,667.11 
5029+400.00  2.93  5.85  10.00  58.50  1,210,608.61 
5029+420.00  2.93  5.85  10.00  58.51  1,210,550.10 
5029+435.11  2.93  5.85  7.56  44.21  1,210,505.89 
5029+440.00  2.93  5.85  2.44  14.30  1,210,491.59 

490 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5029+440.00  2.93  5.85  0.00  0.00  1,210,491.59 


5029+460.00  2.93  5.85  10.00  58.51  1,210,433.08 
5029+480.00  2.93  5.85  10.00  58.52  1,210,374.56 
5029+500.00  2.93  5.85  10.00  58.51  1,210,316.05 
5029+520.00  2.93  5.85  10.00  58.50  1,210,257.55 
5029+540.00  2.93  5.85  10.00  58.50  1,210,199.05 
5029+560.00  2.93  5.85  10.00  58.51  1,210,140.54 
5029+580.00  2.93  5.85  10.00  58.52  1,210,082.02 
5029+600.00  2.93  5.85  10.00  58.51  1,210,023.51 
5029+620.00  2.93  5.85  10.00  58.50  1,209,965.01 
5029+640.00  2.93  5.85  10.00  58.50  1,209,906.51 
5029+660.00  2.93  5.85  10.00  58.51  1,209,848.00 
5029+680.00  2.93  5.85  10.00  58.52  1,209,789.48 
5029+700.00  2.93  5.85  10.00  58.51  1,209,730.97 
5029+720.00  2.93  5.85  10.00  58.50  1,209,672.47 
5029+740.00  2.93  5.85  10.00  58.50  1,209,613.97 
5029+740.00  2.93  5.85  0.00  0.00  1,209,613.97 
5029+740.36  2.93  5.85  0.18  1.06  1,209,612.91 
5029+760.00  2.93  5.85  9.82  57.44  1,209,555.47 
5029+780.00  2.93  5.85  10.00  58.51  1,209,496.96 
5029+800.00  2.93  5.85  10.00  58.51  1,209,438.45 
5029+820.00  2.93  5.85  10.00  58.50  1,209,379.95 
5029+840.00  2.93  5.85  10.00  58.51  1,209,321.44 
5029+860.00  2.93  5.85  10.00  58.51  1,209,262.93 
5029+880.00  2.93  5.85  10.00  58.50  1,209,204.43 
5029+890.36  2.93  5.85  5.18  30.31  1,209,174.12 
5029+900.00  2.93  5.85  4.82  28.19  1,209,145.93 
5029+920.00  2.93  5.85  10.00  58.50  1,209,087.43 
5029+940.00  2.93  5.85  10.00  58.50  1,209,028.93 
5029+960.00  2.93  5.85  10.00  58.51  1,208,970.42 
5029+980.00  2.93  5.85  10.00  58.52  1,208,911.90 
5030+000.00  2.93  5.85  10.00  58.51  1,208,853.39 
5030+020.00  2.93  5.85  10.00  58.50  1,208,794.89 
5030+040.00  2.93  5.85  10.00  58.50  1,208,736.39 
5030+060.00  2.93  5.85  10.00  58.51  1,208,677.88 
5030+065.00  2.93  5.85  2.50  14.63  1,208,663.25 
5030+065.00  2.93  5.85  0.00  0.00  1,208,663.25 
5030+080.00  2.93  5.85  7.50  43.89  1,208,619.36 
5030+100.00  2.93  5.85  10.00  58.51  1,208,560.85 
5030+120.00  2.93  5.85  10.00  58.50  1,208,502.35 
5030+140.00  2.93  5.85  10.00  58.50  1,208,443.85 
5030+160.00  2.93  5.85  10.00  58.51  1,208,385.34 
5030+180.00  2.93  5.85  10.00  58.52  1,208,326.82 
5030+200.00  2.93  5.85  10.00  58.51  1,208,268.31 
5030+220.00  2.93  5.85  10.00  58.50  1,208,209.81 
5030+240.00  2.93  5.85  10.00  58.50  1,208,151.31 
5030+260.00  2.93  5.85  10.00  58.51  1,208,092.80 
5030+280.00  2.93  5.85  10.00  58.52  1,208,034.28 
5030+300.00  2.93  5.85  10.00  58.51  1,207,975.77 
5030+320.00  2.93  5.85  10.00  58.50  1,207,917.27 
5030+340.00  2.93  5.85  10.00  58.50  1,207,858.77 

491 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5030+360.00  2.93  5.85  10.00  58.51  1,207,800.26 


5030+380.00  2.93  5.85  10.00  58.52  1,207,741.74 
5030+400.00  2.93  5.85  10.00  58.51  1,207,683.23 
5030+420.00  2.93  5.85  10.00  58.50  1,207,624.73 
5030+440.00  2.93  5.85  10.00  58.50  1,207,566.23 
5030+460.00  2.93  5.85  10.00  58.51  1,207,507.72 
5030+480.00  2.93  5.85  10.00  58.52  1,207,449.20 
5030+500.00  2.93  5.85  10.00  58.51  1,207,390.69 
5030+520.00  2.93  5.85  10.00  58.50  1,207,332.19 
5030+540.00  2.93  5.85  10.00  58.50  1,207,273.69 
5030+560.00  2.93  5.85  10.00  58.50  1,207,215.19 
5030+580.00  2.93  5.85  10.00  58.50  1,207,156.69 
5030+600.00  2.93  5.85  10.00  58.50  1,207,098.19 
5030+620.00  2.93  5.85  10.00  58.50  1,207,039.69 
5030+640.00  2.93  5.85  10.00  58.50  1,206,981.19 
5030+660.00  2.93  5.85  10.00  58.50  1,206,922.69 
5030+680.00  2.93  5.85  10.00  58.50  1,206,864.19 
5030+700.00  2.93  5.85  10.00  58.50  1,206,805.69 
5030+713.58  2.93  5.85  6.79  39.72  1,206,765.97 
5030+720.00  2.93  5.85  3.21  18.78  1,206,747.19 
5030+740.00  2.93  5.85  10.00  58.50  1,206,688.69 
5030+743.58  2.93  5.85  1.79  10.47  1,206,678.22 
5030+760.00  2.93  5.85  8.21  48.03  1,206,630.19 
5030+780.00  2.93  5.85  10.00  58.50  1,206,571.69 
5030+800.00  2.93  5.85  10.00  58.50  1,206,513.19 
5030+820.00  2.93  5.85  10.00  58.50  1,206,454.69 
5030+831.05  2.93  5.85  5.52  32.32  1,206,422.37 
5030+840.00  2.93  5.85  4.48  26.18  1,206,396.19 
5030+860.00  2.93  5.85  10.00  58.50  1,206,337.69 
5030+861.05  2.93  5.85  0.52  3.07  1,206,334.62 
5030+880.00  2.93  5.85  9.48  55.44  1,206,279.18 
5030+900.00  2.93  5.85  10.00  58.52  1,206,220.66 
5030+920.00  2.93  5.85  10.00  58.51  1,206,162.15 
5030+940.00  2.93  5.85  10.00  58.50  1,206,103.65 
5030+940.00  2.93  5.85  0.00  0.00  1,206,103.65 
5030+960.00  2.93  5.85  10.00  58.50  1,206,045.15 
5030+980.00  2.93  5.85  10.00  58.51  1,205,986.64 
5031+000.00  2.93  5.85  10.00  58.52  1,205,928.12 
5031+020.00  2.93  5.85  10.00  58.51  1,205,869.61 
5031+040.00  2.93  5.85  10.00  58.50  1,205,811.11 
5031+060.00  2.93  5.85  10.00  58.50  1,205,752.61 
5031+080.00  2.93  5.85  10.00  58.51  1,205,694.10 
5031+100.00  2.93  5.85  10.00  58.52  1,205,635.58 
5031+120.00  2.93  5.85  10.00  58.51  1,205,577.07 
5031+140.00  2.93  5.85  10.00  58.50  1,205,518.57 
5031+160.00  2.93  5.85  10.00  58.50  1,205,460.07 
5031+180.00  2.93  5.85  10.00  58.51  1,205,401.56 
5031+200.00  2.93  5.85  10.00  58.52  1,205,343.04 
5031+220.00  2.93  5.85  10.00  58.51  1,205,284.53 
5031+240.00  2.93  5.85  10.00  58.50  1,205,226.03 
5031+260.00  2.93  5.85  10.00  58.50  1,205,167.53 

492 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5031+280.00  2.93  5.85  10.00  58.51  1,205,109.02 


5031+300.00  2.93  5.85  10.00  58.52  1,205,050.50 
5031+320.00  2.93  5.85  10.00  58.51  1,204,991.99 
5031+340.00  2.93  5.85  10.00  58.50  1,204,933.49 
5031+360.00  2.93  5.85  10.00  58.50  1,204,874.99 
5031+380.00  2.93  5.85  10.00  58.51  1,204,816.48 
5031+400.00  2.93  5.85  10.00  58.52  1,204,757.96 
5031+420.00  2.93  5.85  10.00  58.51  1,204,699.45 
5031+440.00  2.93  5.85  10.00  58.50  1,204,640.95 
5031+460.00  2.93  5.85  10.00  58.50  1,204,582.45 
5031+480.00  2.93  5.85  10.00  58.51  1,204,523.94 
5031+500.00  2.93  5.85  10.00  58.52  1,204,465.42 
5031+520.00  2.93  5.85  10.00  58.51  1,204,406.91 
5031+540.00  2.93  5.85  10.00  58.50  1,204,348.41 
5031+560.00  2.93  5.85  10.00  58.50  1,204,289.91 
5031+580.00  2.93  5.85  10.00  58.51  1,204,231.40 
5031+600.00  2.93  5.85  10.00  58.52  1,204,172.88 
5031+620.00  2.93  5.85  10.00  58.51  1,204,114.37 
5031+640.00  2.93  5.85  10.00  58.50  1,204,055.87 
5031+660.00  2.93  5.85  10.00  58.50  1,203,997.37 
5031+680.00  2.93  5.85  10.00  58.51  1,203,938.86 
5031+700.00  2.93  5.85  10.00  58.52  1,203,880.34 
5031+720.00  2.93  5.85  10.00  58.51  1,203,821.83 
5031+740.00  2.93  5.85  10.00  58.50  1,203,763.33 
5031+760.00  2.93  5.85  10.00  58.50  1,203,704.83 
5031+780.00  2.93  5.85  10.00  58.51  1,203,646.32 
5031+800.00  2.93  5.85  10.00  58.52  1,203,587.80 
5031+820.00  2.93  5.85  10.00  58.51  1,203,529.29 
5031+840.00  2.93  5.85  10.00  58.50  1,203,470.79 
5031+860.00  2.93  5.85  10.00  58.50  1,203,412.29 
5031+880.00  2.93  5.85  10.00  58.50  1,203,353.79 
5031+900.00  2.93  5.85  10.00  58.50  1,203,295.29 
5031+920.00  2.93  5.85  10.00  58.51  1,203,236.78 
5031+940.00  2.93  5.85  10.00  58.52  1,203,178.26 
5031+960.00  2.93  5.85  10.00  58.52  1,203,119.74 
5031+980.00  2.93  5.85  10.00  58.51  1,203,061.23 
5032+000.00  2.93  5.85  10.00  58.51  1,203,002.72 
5032+020.00  2.93  5.85  10.00  58.51  1,202,944.21 
5032+040.00  2.93  5.85  10.00  58.50  1,202,885.71 
5032+060.00  2.93  5.85  10.00  58.51  1,202,827.20 
5032+080.00  2.93  5.85  10.00  58.51  1,202,768.69 
5032+100.00  2.93  5.85  10.00  58.50  1,202,710.19 
5032+120.00  2.93  5.85  10.00  58.51  1,202,651.68 
5032+140.00  2.93  5.85  10.00  58.51  1,202,593.17 
5032+160.00  2.93  5.85  10.00  58.50  1,202,534.67 
5032+180.00  2.93  5.85  10.00  58.51  1,202,476.16 
5032+200.00  2.93  5.85  10.00  58.52  1,202,417.64 
5032+220.00  2.93  5.85  10.00  58.51  1,202,359.13 
5032+240.00  2.93  5.85  10.00  58.50  1,202,300.63 
5032+260.00  2.93  5.85  10.00  58.50  1,202,242.13 
5032+280.00  2.93  5.85  10.00  58.51  1,202,183.62 

493 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5032+300.00  2.93  5.85  10.00  58.52  1,202,125.10 


5032+320.00  2.93  5.85  10.00  58.52  1,202,066.58 
5032+340.00  2.93  5.85  10.00  58.52  1,202,008.06 
5032+360.00  2.93  5.85  10.00  58.52  1,201,949.54 
5032+380.00  2.93  5.85  10.00  58.52  1,201,891.02 
5032+400.00  2.93  5.85  10.00  58.52  1,201,832.50 
5032+420.00  2.93  5.85  10.00  58.52  1,201,773.98 
5032+440.00  2.93  5.85  10.00  58.52  1,201,715.46 
5032+460.00  2.93  5.85  10.00  58.52  1,201,656.94 
5032+480.00  2.93  5.85  10.00  58.52  1,201,598.42 
5032+500.00  2.93  5.85  10.00  58.52  1,201,539.90 
5032+520.00  2.93  5.85  10.00  58.52  1,201,481.38 
5032+540.00  2.93  5.85  10.00  58.52  1,201,422.86 
5032+560.00  2.93  5.85  10.00  58.52  1,201,364.34 
5032+580.00  2.93  5.85  10.00  58.52  1,201,305.82 
5032+600.00  2.93  5.85  10.00  58.52  1,201,247.30 
5032+620.00  2.93  5.85  10.00  58.52  1,201,188.78 
5032+640.00  2.93  5.85  10.00  58.52  1,201,130.26 
5032+660.00  2.93  5.85  10.00  58.52  1,201,071.74 
5032+680.00  2.93  5.85  10.00  58.52  1,201,013.22 
5032+700.00  2.93  5.85  10.00  58.52  1,200,954.70 
5032+720.00  2.93  5.85  10.00  58.52  1,200,896.18 
5032+740.00  2.93  5.85  10.00  58.52  1,200,837.66 
5032+760.00  2.93  5.85  10.00  58.52  1,200,779.14 
5032+780.00  2.93  5.85  10.00  58.52  1,200,720.62 
5032+800.00  2.93  5.85  10.00  58.52  1,200,662.10 
5032+820.00  2.93  5.85  10.00  58.52  1,200,603.58 
5032+840.00  2.93  5.85  10.00  58.52  1,200,545.06 
5032+860.00  2.93  5.85  10.00  58.51  1,200,486.55 
5032+880.00  2.93  5.85  10.00  58.50  1,200,428.05 
5032+900.00  2.93  5.85  10.00  58.51  1,200,369.54 
5032+920.00  2.93  5.85  10.00  58.51  1,200,311.03 
5032+940.00  2.93  5.85  10.00  58.50  1,200,252.53 
5032+960.00  2.93  5.85  10.00  58.51  1,200,194.02 
5032+980.00  2.93  5.85  10.00  58.51  1,200,135.51 
5033+000.00  2.93  5.85  10.00  58.50  1,200,077.01 
5033+020.00  2.93  5.85  10.00  58.51  1,200,018.50 
5033+040.00  2.93  5.85  10.00  58.51  1,199,959.99 
5033+060.00  2.93  5.85  10.00  58.50  1,199,901.49 
5033+080.00  2.93  5.85  10.00  58.51  1,199,842.98 
5033+100.00  2.93  5.85  10.00  58.51  1,199,784.47 
5033+120.00  2.93  5.85  10.00  58.51  1,199,725.96 
5033+140.00  2.93  5.85  10.00  58.51  1,199,667.45 
5033+160.00  2.93  5.85  10.00  58.50  1,199,608.95 
5033+180.00  2.93  5.85  10.00  58.50  1,199,550.45 
5033+200.00  2.93  5.85  10.00  58.50  1,199,491.95 
5033+220.00  2.93  5.85  10.00  58.50  1,199,433.45 
5033+240.00  2.93  5.85  10.00  58.50  1,199,374.95 
5033+260.00  2.93  5.85  10.00  58.50  1,199,316.45 
5033+280.00  2.93  5.85  10.00  58.50  1,199,257.95 
5033+300.00  2.93  5.85  10.00  58.50  1,199,199.45 

494 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5033+320.00  2.93  5.85  10.00  58.50  1,199,140.95 


5033+340.00  2.93  5.85  10.00  58.50  1,199,082.45 
5033+360.00  2.93  5.85  10.00  58.51  1,199,023.94 
5033+380.00  2.93  5.85  10.00  58.52  1,198,965.42 
5033+400.00  2.93  5.85  10.00  58.51  1,198,906.91 
5033+420.00  2.93  5.85  10.00  58.50  1,198,848.41 
5033+440.00  2.93  5.85  10.00  58.50  1,198,789.91 
5033+460.00  2.93  5.85  10.00  58.51  1,198,731.40 
5033+480.00  2.93  5.85  10.00  58.52  1,198,672.88 
5033+500.00  2.93  5.85  10.00  58.51  1,198,614.37 
5033+520.00  2.93  5.85  10.00  58.50  1,198,555.87 
5033+540.00  2.93  5.85  10.00  58.50  1,198,497.37 
5033+560.00  2.93  5.85  10.00  58.50  1,198,438.87 
5033+580.00  2.93  5.85  10.00  58.51  1,198,380.36 
5033+600.00  2.93  5.85  10.00  58.51  1,198,321.85 
5033+620.00  2.93  5.85  10.00  58.50  1,198,263.35 
5033+640.00  2.93  5.85  10.00  58.51  1,198,204.84 
5033+660.00  2.93  5.85  10.00  58.52  1,198,146.32 
5033+680.00  2.93  5.85  10.00  58.52  1,198,087.80 
5033+700.00  2.93  5.85  10.00  58.52  1,198,029.28 
5033+720.00  2.93  5.85  10.00  58.52  1,197,970.76 
5033+740.00  2.93  5.85  10.00  58.52  1,197,912.24 
5033+750.00  2.93  5.85  5.00  29.26  1,197,882.98 
5033+760.00  2.93  5.85  5.00  29.26  1,197,853.72 
5033+763.47  2.93  5.85  1.74  10.16  1,197,843.56 
5033+780.00  2.93  5.85  8.26  48.36  1,197,795.20 
5033+793.47  2.93  5.85  6.74  39.42  1,197,755.78 
5033+800.00  2.93  5.85  3.26  19.10  1,197,736.68 
5033+820.00  2.93  5.85  10.00  58.52  1,197,678.16 
5033+840.00  2.93  5.85  10.00  58.52  1,197,619.64 
5033+860.00  2.93  5.85  10.00  58.52  1,197,561.12 
5033+877.83  2.93  5.85  8.92  52.17  1,197,508.95 
5033+880.00  2.93  5.85  1.08  6.35  1,197,502.60 
5033+900.00  2.93  5.85  10.00  58.52  1,197,444.08 
5033+907.83  2.93  5.85  3.92  22.91  1,197,421.17 
5033+920.00  2.93  5.85  6.08  35.61  1,197,385.56 
5033+940.00  2.93  5.85  10.00  58.52  1,197,327.04 
5033+960.00  2.93  5.85  10.00  58.52  1,197,268.52 
5033+980.00  2.93  5.85  10.00  58.52  1,197,210.00 
5034+000.00  2.93  5.85  10.00  58.52  1,197,151.48 
5034+020.00  2.93  5.85  10.00  58.52  1,197,092.96 
5034+040.00  2.93  5.85  10.00  58.51  1,197,034.45 
5034+060.00  2.93  5.85  10.00  58.50  1,196,975.95 
5034+080.00  2.93  5.85  10.00  58.51  1,196,917.44 
5034+100.00  2.93  5.85  10.00  58.51  1,196,858.93 
5034+120.00  2.93  5.85  10.00  58.50  1,196,800.43 
5034+140.00  2.93  5.85  10.00  58.50  1,196,741.93 
5034+160.00  2.93  5.85  10.00  58.51  1,196,683.42 
5034+180.00  2.93  5.85  10.00  58.52  1,196,624.90 
5034+200.00  2.93  5.85  10.00  58.51  1,196,566.39 
5034+200.00  2.93  5.85  0.00  0.00  1,196,566.39 

495 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5034+220.00  2.93  5.85  10.00  58.51  1,196,507.88 


5034+240.00  2.93  5.85  10.00  58.51  1,196,449.37 
5034+260.00  2.93  5.85  10.00  58.51  1,196,390.86 
5034+280.00  2.93  5.85  10.00  58.51  1,196,332.35 
5034+290.00  2.93  5.85  5.00  29.25  1,196,303.10 
5034+290.00  2.93  5.85  0.00  0.00  1,196,303.10 
5034+300.00  2.93  5.85  5.00  29.26  1,196,273.85 
5034+320.00  2.93  5.85  10.00  58.51  1,196,215.34 
5034+340.00  2.93  5.85  10.00  58.51  1,196,156.83 
5034+360.00  2.93  5.85  10.00  58.51  1,196,098.32 
5034+380.00  2.93  5.85  10.00  58.50  1,196,039.82 
5034+400.00  2.93  5.85  10.00  58.50  1,195,981.32 
5034+420.00  2.93  5.85  10.00  58.50  1,195,922.82 
5034+440.00  2.93  5.85  10.00  58.51  1,195,864.31 
5034+450.00  2.93  5.85  5.00  29.26  1,195,835.05 
5034+460.00  2.93  5.85  5.00  29.26  1,195,805.79 
5034+480.00  2.93  5.85  10.00  58.50  1,195,747.29 
5034+500.00  2.93  5.85  10.00  58.51  1,195,688.78 
5034+520.00  2.93  5.85  10.00  58.52  1,195,630.26 
5034+540.00  2.93  5.85  10.00  58.52  1,195,571.74 
5034+560.00  2.93  5.85  10.00  58.52  1,195,513.22 
5034+580.00  2.93  5.85  10.00  58.52  1,195,454.70 
5034+600.00  2.93  5.85  10.00  58.52  1,195,396.18 
5034+620.00  2.93  5.85  10.00  58.52  1,195,337.66 
5034+640.00  2.93  5.85  10.00  58.52  1,195,279.14 
5034+660.00  2.93  5.85  10.00  58.52  1,195,220.62 
5034+680.00  2.93  5.85  10.00  58.52  1,195,162.10 
5034+700.00  2.93  5.85  10.00  58.52  1,195,103.58 
5034+720.00  2.93  5.85  10.00  58.52  1,195,045.06 
5034+740.00  2.93  5.85  10.00  58.52  1,194,986.54 
5034+760.00  2.93  5.85  10.00  58.52  1,194,928.02 
5034+780.00  2.93  5.85  10.00  58.52  1,194,869.50 
5034+800.00  2.93  5.85  10.00  58.52  1,194,810.98 
5034+820.00  2.93  5.85  10.00  58.52  1,194,752.46 
5034+840.00  2.93  5.85  10.00  58.52  1,194,693.94 
5034+860.00  2.93  5.85  10.00  58.52  1,194,635.42 
5034+880.00  2.93  5.85  10.00  58.52  1,194,576.90 
5034+900.00  2.93  5.85  10.00  58.52  1,194,518.38 
5034+920.00  2.93  5.85  10.00  58.52  1,194,459.86 
5034+940.00  2.93  5.85  10.00  58.52  1,194,401.34 
5034+960.00  2.93  5.85  10.00  58.52  1,194,342.82 
5034+980.00  2.93  5.85  10.00  58.52  1,194,284.30 
5035+000.00  2.93  5.85  10.00  58.52  1,194,225.78 
5035+020.00  2.93  5.85  10.00  58.52  1,194,167.26 
5035+028.75  2.93  5.85  4.38  25.61  1,194,141.65 
5035+040.00  2.93  5.85  5.62  32.91  1,194,108.74 
5035+058.75  2.93  5.85  9.38  54.87  1,194,053.87 
5035+060.00  2.93  5.85  0.62  3.65  1,194,050.22 
5035+080.00  2.93  5.85  10.00  58.52  1,193,991.70 
5035+100.00  2.93  5.85  10.00  58.52  1,193,933.18 
5035+100.00  2.93  5.85  0.00  0.00  1,193,933.18 

496 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5035+120.00  2.93  5.85  10.00  58.52  1,193,874.66 


5035+140.00  2.93  5.85  10.00  58.52  1,193,816.14 
5035+143.04  2.93  5.85  1.52  8.90  1,193,807.24 
5035+160.00  2.93  5.85  8.48  49.62  1,193,757.62 
5035+173.04  2.93  5.85  6.52  38.16  1,193,719.46 
5035+180.00  2.93  5.85  3.48  20.36  1,193,699.10 
5035+200.00  2.93  5.85  10.00  58.52  1,193,640.58 
5035+220.00  2.93  5.85  10.00  58.52  1,193,582.06 
5035+240.00  2.93  5.85  10.00  58.52  1,193,523.54 
5035+260.00  2.93  5.85  10.00  58.52  1,193,465.02 
5035+280.00  2.93  5.85  10.00  58.52  1,193,406.50 
5035+300.00  2.93  5.85  10.00  58.52  1,193,347.98 
5035+320.00  2.93  5.85  10.00  58.52  1,193,289.46 
5035+340.00  2.93  5.85  10.00  58.52  1,193,230.94 
5035+360.00  2.93  5.85  10.00  58.52  1,193,172.42 
5035+380.00  2.93  5.85  10.00  58.52  1,193,113.90 
5035+400.00  2.93  5.85  10.00  58.52  1,193,055.38 
5035+420.00  2.93  5.85  10.00  58.51  1,192,996.87 
5035+440.00  2.93  5.85  10.00  58.50  1,192,938.37 
5035+460.00  2.93  5.85  10.00  58.51  1,192,879.86 
5035+480.00  2.93  5.85  10.00  58.51  1,192,821.35 
5035+500.00  2.93  5.85  10.00  58.50  1,192,762.85 
5035+520.00  2.93  5.85  10.00  58.50  1,192,704.35 
5035+540.00  2.93  5.85  10.00  58.51  1,192,645.84 
5035+560.00  2.93  5.85  10.00  58.52  1,192,587.32 
5035+580.00  2.93  5.85  10.00  58.51  1,192,528.81 
5035+600.00  2.93  5.85  10.00  58.51  1,192,470.30 
5035+620.00  2.93  5.85  10.00  58.51  1,192,411.79 
5035+640.00  2.93  5.85  10.00  58.51  1,192,353.28 
5035+660.00  2.93  5.85  10.00  58.51  1,192,294.77 
5035+680.00  2.93  5.85  10.00  58.51  1,192,236.26 
5035+700.00  2.93  5.85  10.00  58.51  1,192,177.75 
5035+720.00  2.93  5.85  10.00  58.51  1,192,119.24 
5035+740.00  2.93  5.85  10.00  58.51  1,192,060.73 
5035+760.00  2.93  5.85  10.00  58.50  1,192,002.23 
5035+780.00  2.93  5.85  10.00  58.50  1,191,943.73 
5035+800.00  2.93  5.85  10.00  58.50  1,191,885.23 
5035+820.00  2.93  5.85  10.00  58.51  1,191,826.72 
5035+840.00  2.93  5.85  10.00  58.51  1,191,768.21 
5035+860.00  2.93  5.85  10.00  58.50  1,191,709.71 
5035+880.00  2.93  5.85  10.00  58.51  1,191,651.20 
5035+900.00  2.93  5.85  10.00  58.52  1,191,592.68 
5035+920.00  2.93  5.85  10.00  58.52  1,191,534.16 
5035+940.00  2.93  5.85  10.00  58.52  1,191,475.64 
5035+960.00  2.93  5.85  10.00  58.52  1,191,417.12 
5035+980.00  2.93  5.85  10.00  58.52  1,191,358.60 
5036+000.00  2.93  5.85  10.00  58.52  1,191,300.08 
5036+000.00  2.93  5.85  0.00  0.00  1,191,300.08 
5036+020.00  2.93  5.85  10.00  58.52  1,191,241.56 
5036+040.00  2.93  5.85  10.00  58.52  1,191,183.04 
5036+060.00  2.93  5.85  10.00  58.52  1,191,124.52 

497 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5036+080.00  2.93  5.85  10.00  58.52  1,191,066.00 


5036+100.00  2.93  5.85  10.00  58.52  1,191,007.48 
5036+120.00  2.93  5.85  10.00  58.52  1,190,948.96 
5036+140.00  2.93  5.85  10.00  58.52  1,190,890.44 
5036+160.00  2.93  5.85  10.00  58.52  1,190,831.92 
5036+180.00  2.93  5.85  10.00  58.52  1,190,773.40 
5036+200.00  2.93  5.85  10.00  58.52  1,190,714.88 
5036+220.00  2.93  5.85  10.00  58.52  1,190,656.36 
5036+240.00  2.93  5.85  10.00  58.52  1,190,597.84 
5036+260.00  2.93  5.85  10.00  58.52  1,190,539.32 
5036+280.00  2.93  5.85  10.00  58.52  1,190,480.80 
5036+300.00  2.93  5.85  10.00  58.52  1,190,422.28 
5036+320.00  2.93  5.85  10.00  58.52  1,190,363.76 
5036+340.00  2.93  5.85  10.00  58.52  1,190,305.24 
5036+360.00  2.93  5.85  10.00  58.52  1,190,246.72 
5036+360.00  2.93  5.85  0.00  0.00  1,190,246.72 
5036+380.00  2.93  5.85  10.00  58.52  1,190,188.20 
5036+400.00  2.93  5.85  10.00  58.52  1,190,129.68 
5036+420.00  2.93  5.85  10.00  58.52  1,190,071.16 
5036+440.00  2.93  5.85  10.00  58.52  1,190,012.64 
5036+460.00  2.93  5.85  10.00  58.52  1,189,954.12 
5036+480.00  2.93  5.85  10.00  58.52  1,189,895.60 
5036+500.00  2.93  5.85  10.00  58.52  1,189,837.08 
5036+500.00  2.93  5.85  0.00  0.00  1,189,837.08 
5036+520.00  2.93  5.85  10.00  58.52  1,189,778.56 
5036+540.00  2.93  5.85  10.00  58.52  1,189,720.04 
5036+560.00  2.93  5.85  10.00  58.52  1,189,661.52 
5036+580.00  2.93  5.85  10.00  58.52  1,189,603.00 
5036+600.00  2.93  5.85  10.00  58.52  1,189,544.48 
5036+620.00  2.93  5.85  10.00  58.52  1,189,485.96 
5036+640.00  2.93  5.85  10.00  58.52  1,189,427.44 
5036+660.00  2.93  5.85  10.00  58.52  1,189,368.92 
5036+680.00  2.93  5.85  10.00  58.52  1,189,310.40 
5036+700.00  2.93  5.85  10.00  58.52  1,189,251.88 
5036+720.00  2.93  5.85  10.00  58.52  1,189,193.36 
5036+740.00  2.93  5.85  10.00  58.52  1,189,134.84 
5036+760.00  2.93  5.85  10.00  58.52  1,189,076.32 
5036+780.00  2.93  5.85  10.00  58.52  1,189,017.80 
5036+800.00  2.93  5.85  10.00  58.52  1,188,959.28 
5036+820.00  2.93  5.85  10.00  58.52  1,188,900.76 
5036+840.00  2.93  5.85  10.00  58.52  1,188,842.24 
5036+860.00  2.93  5.85  10.00  58.52  1,188,783.72 
5036+880.00  2.93  5.85  10.00  58.52  1,188,725.20 
5036+900.00  2.93  5.85  10.00  58.52  1,188,666.68 
5036+920.00  2.93  5.85  10.00  58.52  1,188,608.16 
5036+940.00  2.93  5.85  10.00  58.52  1,188,549.64 
5036+960.00  2.93  5.85  10.00  58.52  1,188,491.12 
5036+980.00  2.93  5.85  10.00  58.52  1,188,432.60 
5037+000.00  2.93  5.85  10.00  58.52  1,188,374.08 
5037+020.00  2.93  5.85  10.00  58.52  1,188,315.56 
5037+040.00  2.93  5.85  10.00  58.52  1,188,257.04 

498 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5037+060.00  2.93  5.85  10.00  58.52  1,188,198.52 


5037+080.00  2.93  5.85  10.00  58.52  1,188,140.00 
5037+100.00  2.93  5.85  10.00  58.52  1,188,081.48 
5037+120.00  2.93  5.85  10.00  58.52  1,188,022.96 
5037+140.00  2.93  5.85  10.00  58.52  1,187,964.44 
5037+160.00  2.93  5.85  10.00  58.52  1,187,905.92 
5037+180.00  2.93  5.85  10.00  58.52  1,187,847.40 
5037+200.00  2.93  5.85  10.00  58.52  1,187,788.88 
5037+220.00  2.93  5.85  10.00  58.52  1,187,730.36 
5037+240.00  2.93  5.85  10.00  58.52  1,187,671.84 
5037+260.00  2.93  5.85  10.00  58.52  1,187,613.32 
5037+280.00  2.93  5.85  10.00  58.52  1,187,554.80 
5037+300.00  2.93  5.85  10.00  58.52  1,187,496.28 
5037+320.00  2.93  5.85  10.00  58.52  1,187,437.76 
5037+340.00  2.93  5.85  10.00  58.52  1,187,379.24 
5037+360.00  2.93  5.85  10.00  58.52  1,187,320.72 
5037+380.00  2.93  5.85  10.00  58.52  1,187,262.20 
5037+400.00  2.93  5.85  10.00  58.52  1,187,203.68 
5037+420.00  2.93  5.85  10.00  58.52  1,187,145.16 
5037+440.00  2.93  5.85  10.00  58.52  1,187,086.64 
5037+460.00  2.93  5.85  10.00  58.52  1,187,028.12 
5037+480.00  2.93  5.85  10.00  58.52  1,186,969.60 
5037+500.00  2.93  5.85  10.00  58.52  1,186,911.08 
5037+520.00  2.93  5.85  10.00  58.52  1,186,852.56 
5037+540.00  2.93  5.85  10.00  58.52  1,186,794.04 
5037+560.00  2.93  5.85  10.00  58.51  1,186,735.53 
5037+580.00  2.93  5.85  10.00  58.50  1,186,677.03 
5037+600.00  2.93  5.85  10.00  58.50  1,186,618.53 
5037+620.00  2.93  5.85  10.00  58.51  1,186,560.02 
5037+640.00  2.93  5.85  10.00  58.51  1,186,501.51 
5037+660.00  2.93  5.85  10.00  58.51  1,186,443.00 
5037+680.00  2.93  5.85  10.00  58.52  1,186,384.48 
5037+700.00  2.93  5.85  10.00  58.51  1,186,325.97 
5037+720.00  2.93  5.85  10.00  58.51  1,186,267.46 
5037+740.00  2.93  5.85  10.00  58.51  1,186,208.95 
5037+760.00  2.93  5.85  10.00  58.50  1,186,150.45 
5037+780.00  2.93  5.85  10.00  58.50  1,186,091.95 
5037+800.00  2.93  5.85  10.00  58.50  1,186,033.45 
5037+820.00  2.93  5.85  10.00  58.50  1,185,974.95 
5037+840.00  2.93  5.85  10.00  58.50  1,185,916.45 
5037+860.00  2.93  5.85  10.00  58.50  1,185,857.95 
5037+880.00  2.93  5.85  10.00  58.50  1,185,799.45 
5037+900.00  2.93  5.85  10.00  58.51  1,185,740.94 
5037+920.00  2.93  5.85  10.00  58.51  1,185,682.43 
5037+940.00  2.93  5.85  10.00  58.50  1,185,623.93 
5037+960.00  2.93  5.85  10.00  58.50  1,185,565.43 
5037+980.00  2.93  5.85  10.00  58.51  1,185,506.92 
5038+000.00  2.93  5.85  10.00  58.51  1,185,448.41 
5038+020.00  2.93  5.85  10.00  58.50  1,185,389.91 
5038+040.00  2.93  5.85  10.00  58.51  1,185,331.40 
5038+060.00  2.93  5.85  10.00  58.51  1,185,272.89 

499 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5038+080.00  2.93  5.85  10.00  58.50  1,185,214.39 


5038+100.00  2.93  5.85  10.00  58.51  1,185,155.88 
5038+120.00  2.93  5.85  10.00  58.51  1,185,097.37 
5038+140.00  2.93  5.85  10.00  58.50  1,185,038.87 
5038+160.00  2.93  5.85  10.00  58.50  1,184,980.37 
5038+180.00  2.93  5.85  10.00  58.50  1,184,921.87 
5038+200.00  2.93  5.85  10.00  58.50  1,184,863.37 
5038+220.00  2.93  5.85  10.00  58.50  1,184,804.87 
5038+240.00  2.93  5.85  10.00  58.50  1,184,746.37 
5038+260.00  2.93  5.85  10.00  58.50  1,184,687.87 
5038+280.00  2.93  5.85  10.00  58.50  1,184,629.37 
5038+300.00  2.93  5.85  10.00  58.51  1,184,570.86 
5038+320.00  2.93  5.85  10.00  58.52  1,184,512.34 
5038+340.00  2.93  5.85  10.00  58.51  1,184,453.83 
5038+360.00  2.93  5.85  10.00  58.51  1,184,395.32 
5038+380.00  2.93  5.85  10.00  58.52  1,184,336.80 
5038+400.00  2.93  5.85  10.00  58.52  1,184,278.28 
5038+420.00  2.93  5.85  10.00  58.52  1,184,219.76 
5038+440.00  2.93  5.85  10.00  58.52  1,184,161.24 
5038+460.00  2.93  5.85  10.00  58.52  1,184,102.72 
5038+480.00  2.93  5.85  10.00  58.52  1,184,044.20 
5038+500.00  2.93  5.85  10.00  58.52  1,183,985.68 
5038+520.00  2.93  5.85  10.00  58.52  1,183,927.16 
5038+540.00  2.93  5.85  10.00  58.52  1,183,868.64 
5038+560.00  2.93  5.85  10.00  58.52  1,183,810.12 
5038+580.00  2.93  5.85  10.00  58.52  1,183,751.60 
5038+600.00  2.93  5.85  10.00  58.52  1,183,693.08 
5038+620.00  2.93  5.85  10.00  58.52  1,183,634.56 
5038+640.00  2.93  5.85  10.00  58.52  1,183,576.04 
5038+660.00  2.93  5.85  10.00  58.52  1,183,517.52 
5038+680.00  2.93  5.85  10.00  58.52  1,183,459.00 
5038+700.00  2.93  5.85  10.00  58.52  1,183,400.48 
5038+720.00  2.93  5.85  10.00  58.52  1,183,341.96 
5038+740.00  2.93  5.85  10.00  58.52  1,183,283.44 
5038+760.00  2.93  5.85  10.00  58.51  1,183,224.93 
5038+780.00  2.93  5.85  10.00  58.50  1,183,166.43 
5038+800.00  2.93  5.85  10.00  58.51  1,183,107.92 
5038+820.00  2.93  5.85  10.00  58.52  1,183,049.40 
5038+840.00  2.93  5.85  10.00  58.52  1,182,990.88 
5038+860.00  2.93  5.85  10.00  58.51  1,182,932.37 
5038+880.00  2.93  5.85  10.00  58.50  1,182,873.87 
5038+900.00  2.93  5.85  10.00  58.51  1,182,815.36 
5038+920.00  2.93  5.85  10.00  58.52  1,182,756.84 
5038+940.00  2.93  5.85  10.00  58.52  1,182,698.32 
5038+960.00  2.93  5.85  10.00  58.52  1,182,639.80 
5038+980.00  2.93  5.85  10.00  58.52  1,182,581.28 
5039+000.00  2.93  5.85  10.00  58.52  1,182,522.76 
5039+020.00  2.93  5.85  10.00  58.52  1,182,464.24 
5039+040.00  2.93  5.85  10.00  58.52  1,182,405.72 
5039+060.00  2.93  5.85  10.00  58.52  1,182,347.20 
5039+080.00  2.93  5.85  10.00  58.51  1,182,288.69 

500 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5039+100.00  2.93  5.85  10.00  58.50  1,182,230.19 


5039+120.00  2.93  5.85  10.00  58.51  1,182,171.68 
5039+140.00  2.93  5.85  10.00  58.52  1,182,113.16 
5039+160.00  2.93  5.85  10.00  58.52  1,182,054.64 
5039+180.00  2.93  5.85  10.00  58.51  1,181,996.13 
5039+200.00  2.93  5.85  10.00  58.50  1,181,937.63 
5039+220.00  2.93  5.85  10.00  58.51  1,181,879.12 
5039+240.00  2.93  5.85  10.00  58.52  1,181,820.60 
5039+260.00  2.93  5.85  10.00  58.52  1,181,762.08 
5039+280.00  2.93  5.85  10.00  58.52  1,181,703.56 
5039+300.00  2.93  5.85  10.00  58.52  1,181,645.04 
5039+301.44  2.93  5.85  0.72  4.21  1,181,640.83 
5039+320.00  2.93  5.85  9.28  54.30  1,181,586.53 
5039+340.00  2.93  5.85  10.00  58.50  1,181,528.03 
5039+351.44  2.93  5.85  5.72  33.46  1,181,494.57 
5039+360.00  2.93  5.85  4.28  25.04  1,181,469.53 
5039+380.00  2.93  5.85  10.00  58.50  1,181,411.03 
5039+400.00  2.93  5.85  10.00  58.50  1,181,352.53 
5039+420.00  2.93  5.85  10.00  58.50  1,181,294.03 
5039+440.00  2.93  5.85  10.00  58.50  1,181,235.53 
5039+441.77  2.93  5.85  0.88  5.17  1,181,230.37 
5039+460.00  2.93  5.85  9.12  53.33  1,181,177.03 
5039+480.00  2.93  5.85  10.00  58.51  1,181,118.52 
5039+491.77  2.93  5.85  5.88  34.43  1,181,084.09 
5039+500.00  2.93  5.85  4.12  24.09  1,181,060.00 
5039+520.00  2.93  5.85  10.00  58.52  1,181,001.48 
5039+540.00  2.93  5.85  10.00  58.52  1,180,942.96 
5039+560.00  2.93  5.85  10.00  58.52  1,180,884.44 
5039+580.00  2.93  5.85  10.00  58.52  1,180,825.92 
5039+600.00  2.93  5.85  10.00  58.52  1,180,767.40 
5039+620.00  2.93  5.85  10.00  58.52  1,180,708.88 
5039+640.00  2.93  5.85  10.00  58.52  1,180,650.36 
5039+660.00  2.93  5.85  10.00  58.52  1,180,591.84 
5039+680.00  2.93  5.85  10.00  58.52  1,180,533.32 
5039+700.00  2.93  5.85  10.00  58.52  1,180,474.80 
5039+720.00  2.93  5.85  10.00  58.52  1,180,416.28 
5039+740.00  2.93  5.85  10.00  58.52  1,180,357.76 
5039+760.00  2.93  5.85  10.00  58.52  1,180,299.24 
5039+780.00  2.93  5.85  10.00  58.52  1,180,240.72 
5039+800.00  2.93  5.85  10.00  58.52  1,180,182.20 
5039+820.00  2.93  5.85  10.00  58.52  1,180,123.68 
5039+840.00  2.93  5.85  10.00  58.52  1,180,065.16 
5039+860.00  2.93  5.85  10.00  58.52  1,180,006.64 
5039+880.00  2.93  5.85  10.00  58.52  1,179,948.12 
5039+900.00  2.93  5.85  10.00  58.52  1,179,889.60 
5039+920.00  2.93  5.85  10.00  58.52  1,179,831.08 
5039+940.00  2.93  5.85  10.00  58.52  1,179,772.56 
5039+960.00  2.93  5.85  10.00  58.52  1,179,714.04 
5039+980.00  2.93  5.85  10.00  58.52  1,179,655.52 
5040+000.00  2.93  5.85  10.00  58.52  1,179,597.00 
5040+020.00  2.93  5.85  10.00  58.52  1,179,538.48 

501 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5040+040.00  2.93  5.85  10.00  58.52  1,179,479.96 


5040+060.00  2.93  5.85  10.00  58.52  1,179,421.44 
5040+080.00  2.93  5.85  10.00  58.52  1,179,362.92 
5040+100.00  2.93  5.85  10.00  58.52  1,179,304.40 
5040+120.00  2.93  5.85  10.00  58.51  1,179,245.89 
5040+140.00  2.93  5.85  10.00  58.50  1,179,187.39 
5040+160.00  2.93  5.85  10.00  58.51  1,179,128.88 
5040+180.00  2.93  5.85  10.00  58.52  1,179,070.36 
5040+200.00  2.93  5.85  10.00  58.51  1,179,011.85 
5040+220.00  2.93  5.85  10.00  58.50  1,178,953.35 
5040+240.00  2.93  5.85  10.00  58.51  1,178,894.84 
5040+260.00  2.93  5.85  10.00  58.51  1,178,836.33 
5040+280.00  2.93  5.85  10.00  58.50  1,178,777.83 
5040+300.00  2.93  5.85  10.00  58.50  1,178,719.33 
5040+320.00  2.93  5.85  10.00  58.50  1,178,660.83 
5040+340.00  2.93  5.85  10.00  58.51  1,178,602.32 
5040+360.00  2.93  5.85  10.00  58.52  1,178,543.80 
5040+380.00  2.93  5.85  10.00  58.51  1,178,485.29 
5040+400.00  2.93  5.85  10.00  58.50  1,178,426.79 
5040+420.00  2.93  5.85  10.00  58.50  1,178,368.29 
5040+440.00  2.93  5.85  10.00  58.50  1,178,309.79 
5040+460.00  2.93  5.85  10.00  58.50  1,178,251.29 
5040+480.00  2.93  5.85  10.00  58.50  1,178,192.79 
5040+500.00  2.93  5.85  10.00  58.51  1,178,134.28 
5040+520.00  2.93  5.85  10.00  58.51  1,178,075.77 
5040+540.00  2.93  5.85  10.00  58.50  1,178,017.27 
5040+540.00  2.93  5.85  0.00  0.00  1,178,017.27 
5040+540.00  0.00  2.93  0.00  0.00  1,178,017.27 
5040+560.00  0.00  0.00  10.00  0.00  1,178,017.27 
5040+571.00  0.00  0.00  5.50  0.00  1,178,017.27 
5040+571.00  0.00  0.00  0.00  0.00  1,178,017.27 
5040+571.00  2.93  2.93  0.00  0.00  1,178,017.27 
5040+580.00  2.93  5.85  4.50  26.33  1,177,990.94 
5040+600.00  2.93  5.85  10.00  58.52  1,177,932.42 
5040+620.00  2.93  5.85  10.00  58.52  1,177,873.90 
5040+640.00  2.93  5.85  10.00  58.52  1,177,815.38 
5040+660.00  2.93  5.85  10.00  58.52  1,177,756.86 
5040+680.00  2.93  5.85  10.00  58.52  1,177,698.34 
5040+700.00  2.93  5.85  10.00  58.52  1,177,639.82 
5040+720.00  2.93  5.85  10.00  58.52  1,177,581.30 
5040+740.00  2.93  5.85  10.00  58.52  1,177,522.78 
5040+760.00  2.93  5.85  10.00  58.52  1,177,464.26 
5040+780.00  2.93  5.85  10.00  58.52  1,177,405.74 
5040+800.00  2.93  5.85  10.00  58.52  1,177,347.22 
5040+820.00  2.93  5.85  10.00  58.52  1,177,288.70 
5040+840.00  2.93  5.85  10.00  58.52  1,177,230.18 
5040+860.00  2.93  5.85  10.00  58.52  1,177,171.66 
5040+880.00  2.93  5.85  10.00  58.52  1,177,113.14 
5040+900.00  2.93  5.85  10.00  58.52  1,177,054.62 
5040+920.00  2.93  5.85  10.00  58.52  1,176,996.10 
5040+940.00  2.93  5.85  10.00  58.52  1,176,937.58 

502 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5040+960.00  2.93  5.85  10.00  58.52  1,176,879.06 


5040+980.00  2.93  5.85  10.00  58.52  1,176,820.54 
5041+000.00  2.93  5.85  10.00  58.52  1,176,762.02 
5041+020.00  2.93  5.85  10.00  58.52  1,176,703.50 
5041+040.00  2.93  5.85  10.00  58.52  1,176,644.98 
5041+060.00  2.93  5.85  10.00  58.52  1,176,586.46 
5041+080.00  2.93  5.85  10.00  58.52  1,176,527.94 
5041+100.00  2.93  5.85  10.00  58.52  1,176,469.42 
5041+120.00  2.93  5.85  10.00  58.52  1,176,410.90 
5041+140.00  2.93  5.85  10.00  58.52  1,176,352.38 
5041+160.00  2.93  5.85  10.00  58.52  1,176,293.86 
5041+180.00  2.93  5.85  10.00  58.52  1,176,235.34 
5041+200.00  2.93  5.85  10.00  58.52  1,176,176.82 
5041+200.00  2.93  5.85  0.00  0.00  1,176,176.82 
5041+220.00  2.93  5.85  10.00  58.52  1,176,118.30 
5041+235.00  2.93  5.85  7.50  43.89  1,176,074.41 
5041+235.00  2.93  5.85  0.00  0.00  1,176,074.41 
5041+235.00  0.00  2.93  0.00  0.00  1,176,074.41 
5041+240.00  0.00  0.00  2.50  0.00  1,176,074.41 
5041+250.00  0.00  0.00  5.00  0.00  1,176,074.41 
5041+250.00  0.00  0.00  0.00  0.00  1,176,074.41 
5041+260.00  0.00  0.00  5.00  0.00  1,176,074.41 
5041+268.00  0.00  0.00  4.00  0.00  1,176,074.41 
5041+268.00  0.00  0.00  0.00  0.00  1,176,074.41 
5041+268.00  2.93  2.93  0.00  0.00  1,176,074.40 
5041+280.00  2.93  5.85  6.00  35.11  1,176,039.29 
5041+300.00  2.93  5.85  10.00  58.52  1,175,980.77 
5041+320.00  2.93  5.85  10.00  58.52  1,175,922.25 
5041+340.00  2.93  5.85  10.00  58.52  1,175,863.73 
5041+360.00  2.93  5.85  10.00  58.52  1,175,805.21 
5041+370.00  2.93  5.85  5.00  29.26  1,175,775.95 
5041+370.00  2.93  5.85  0.00  0.00  1,175,775.95 
5041+370.00  0.00  2.93  0.00  0.00  1,175,775.95 
5041+380.00  0.00  0.00  5.00  0.00  1,175,775.95 
5041+400.00  0.00  0.00  10.00  0.00  1,175,775.95 
5041+402.00  0.00  0.00  1.00  0.00  1,175,775.95 
5041+402.00  0.00  0.00  0.00  0.00  1,175,775.95 
5041+402.00  0.00  0.00  0.00  0.00  1,175,775.95 
5041+402.00  2.93  2.93  0.00  0.00  1,175,775.95 
5041+420.00  2.93  5.85  9.00  52.65  1,175,723.30 
5041+440.00  2.93  5.85  10.00  58.50  1,175,664.80 
5041+460.00  2.93  5.85  10.00  58.50  1,175,606.30 
5041+480.00  2.93  5.85  10.00  58.50  1,175,547.80 
5041+500.00  2.93  5.85  10.00  58.50  1,175,489.30 
5041+520.00  2.93  5.85  10.00  58.50  1,175,430.80 
5041+540.00  2.93  5.85  10.00  58.50  1,175,372.30 
5041+560.00  2.93  5.85  10.00  58.50  1,175,313.80 
5041+580.00  2.93  5.85  10.00  58.50  1,175,255.30 
5041+600.00  2.93  5.85  10.00  58.51  1,175,196.79 
5041+620.00  2.93  5.85  10.00  58.52  1,175,138.27 
5041+640.00  2.93  5.85  10.00  58.52  1,175,079.75 

503 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5041+660.00  2.93  5.85  10.00  58.51  1,175,021.24 


5041+680.00  2.93  5.85  10.00  58.50  1,174,962.74 
5041+700.00  2.93  5.85  10.00  58.50  1,174,904.24 
5041+720.00  2.93  5.85  10.00  58.50  1,174,845.74 
5041+740.00  2.93  5.85  10.00  58.50  1,174,787.24 
5041+760.00  2.93  5.85  10.00  58.50  1,174,728.74 
5041+780.00  2.93  5.85  10.00  58.50  1,174,670.24 
5041+800.00  2.93  5.85  10.00  58.50  1,174,611.74 
5041+820.00  2.93  5.85  10.00  58.50  1,174,553.24 
5041+840.00  2.93  5.85  10.00  58.50  1,174,494.74 
5041+860.00  2.93  5.85  10.00  58.50  1,174,436.24 
5041+880.00  2.93  5.85  10.00  58.50  1,174,377.74 
5041+900.00  2.93  5.85  10.00  58.51  1,174,319.23 
5041+920.00  2.93  5.85  10.00  58.52  1,174,260.71 
5041+940.00  2.93  5.85  10.00  58.52  1,174,202.19 
5041+960.00  2.93  5.85  10.00  58.52  1,174,143.67 
5041+980.00  2.93  5.85  10.00  58.52  1,174,085.15 
5042+000.00  2.93  5.85  10.00  58.52  1,174,026.63 
5042+002.37  2.93  5.85  1.18  6.93  1,174,019.70 
5042+020.00  2.93  5.85  8.82  51.59  1,173,968.11 
5042+032.37  2.93  5.85  6.18  36.19  1,173,931.92 
5042+040.00  2.93  5.85  3.82  22.33  1,173,909.59 
5042+060.00  2.93  5.85  10.00  58.52  1,173,851.07 
5042+080.00  2.93  5.85  10.00  58.52  1,173,792.55 
5042+100.00  2.93  5.85  10.00  58.52  1,173,734.03 
5042+120.00  2.93  5.85  10.00  58.52  1,173,675.51 
5042+120.89  2.93  5.85  0.44  2.60  1,173,672.91 
5042+140.00  2.93  5.85  9.56  55.92  1,173,616.99 
5042+150.89  2.93  5.85  5.44  31.86  1,173,585.13 
5042+160.00  2.93  5.85  4.56  26.66  1,173,558.47 
5042+180.00  2.93  5.85  10.00  58.52  1,173,499.95 
5042+200.00  2.93  5.85  10.00  58.52  1,173,441.43 
5042+220.00  2.93  5.85  10.00  58.52  1,173,382.91 
5042+240.00  2.93  5.85  10.00  58.52  1,173,324.39 
5042+260.00  2.93  5.85  10.00  58.52  1,173,265.87 
5042+280.00  2.93  5.85  10.00  58.52  1,173,207.35 
5042+300.00  2.93  5.85  10.00  58.52  1,173,148.83 
5042+320.00  2.93  5.85  10.00  58.52  1,173,090.31 
5042+340.00  2.93  5.85  10.00  58.52  1,173,031.79 
5042+360.00  2.93  5.85  10.00  58.52  1,172,973.27 
5042+380.00  2.93  5.85  10.00  58.52  1,172,914.75 
5042+400.00  2.93  5.85  10.00  58.52  1,172,856.23 
5042+420.00  2.93  5.85  10.00  58.52  1,172,797.71 
5042+440.00  2.93  5.85  10.00  58.52  1,172,739.19 
5042+460.00  2.93  5.85  10.00  58.52  1,172,680.67 
5042+460.03  2.93  5.85  0.01  0.08  1,172,680.59 
5042+470.00  2.93  5.85  4.99  29.19  1,172,651.40 
5042+480.00  2.93  5.86  5.00  29.30  1,172,622.11 
5042+480.03  2.93  5.86  0.01  0.09  1,172,622.02 
5042+490.00  2.94  5.88  4.99  29.29  1,172,592.73 
5042+500.00  2.98  5.93  5.00  29.63  1,172,563.10 

504 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

5042+510.00  3.04  6.03  5.00  30.13  1,172,532.97 


5042+520.00  3.13  6.18  5.00  30.88  1,172,502.09 
5042+530.00  3.24  6.38  5.00  31.88  1,172,470.22 
5042+540.00  3.38  6.63  5.00  33.13  1,172,437.09 
5042+550.00  3.53  6.91  5.00  34.57  1,172,402.52 
5042+560.00  3.68  7.21  5.00  36.07  1,172,366.45 
5042+570.00  3.83  7.51  5.00  37.56  1,172,328.89 
5042+580.00  3.98  7.81  5.00  39.06  1,172,289.83 
5042+590.00  4.12  8.10  5.00  40.50  1,172,249.33 
5042+600.00  4.23  8.35  5.00  41.76  1,172,207.58 
5042+600.00  4.23  8.46  0.00  0.00  1,172,207.58 
5042+610.00  4.32  8.55  5.00  42.76  1,172,164.82 
5042+620.00  4.38  8.70  5.00  43.51  1,172,121.32 
5042+630.00  4.42  8.80  5.00  44.01  1,172,077.31 
5042+640.00  4.43  8.85  5.00  44.26  1,172,033.06 
5042+650.00  4.43  8.86  5.00  44.32  1,171,988.74 
5042+660.00  4.43  8.86  5.00  44.32  1,171,944.42 
5042+680.00  4.43  8.86  10.00  88.64  1,171,855.78 
5042+700.00  4.43  8.86  10.00  88.64  1,171,767.14 
5042+720.00  4.43  8.86  10.00  88.64  1,171,678.50 
5042+740.00  4.43  8.86  10.00  88.64  1,171,589.86 
5042+760.00  4.43  8.86  10.00  88.64  1,171,501.22 
5042+780.00  4.43  8.86  10.00  88.64  1,171,412.58 
5042+800.00  4.43  8.86  10.00  88.64  1,171,323.94 
5042+800.00  4.43  8.86  0.00  0.00  1,171,323.94 
5042+820.00  4.43  8.86  10.00  88.64  1,171,235.30 
5042+840.00  4.43  8.86  10.00  88.64  1,171,146.66 
5042+860.00  4.43  8.86  10.00  88.64  1,171,058.02 
5042+862.97  4.43  8.86  1.48  13.16  1,171,044.86 
5042+880.00  4.43  8.86  8.52  75.47  1,170,969.39 
5042+900.00  4.43  8.86  10.00  88.63  1,170,880.76 
5042+920.00  4.43  8.86  10.00  88.63  1,170,792.13 
5042+940.00  4.43  8.86  10.00  88.63  1,170,703.50 
5042+960.00  4.43  8.86  10.00  88.63  1,170,614.87 
5042+980.00  4.43  8.86  10.00  88.63  1,170,526.24 
5043+000.00  4.43  8.86  10.00  88.63  1,170,437.61 
 

TABLA 37 CÁLCULO DE ACARREOS DE SUB‐BALASTO DEL TRAMO 5071+500 – 6006+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5071+500.00  2.81  2.81        1,300,000.00 


5071+520.00  2.81  5.61  10.00  56.12  1,299,943.88 
5071+540.00  2.81  5.61  10.00  56.12  1,299,887.76 
5071+560.00  2.81  5.61  10.00  56.12  1,299,831.64 
5071+580.00  2.81  5.61  10.00  56.12  1,299,775.52 

505 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5071+580.00  2.81  5.61  0.00  0.00  1,299,775.52 


5071+600.00  2.81  5.61  10.00  56.12  1,299,719.40 
5071+620.00  2.81  5.61  10.00  56.11  1,299,663.29 
5071+640.00  2.81  5.61  10.00  56.10  1,299,607.19 
5071+660.00  2.81  5.61  10.00  56.10  1,299,551.09 
5071+660.00  2.81  5.61  0.00  0.00  1,299,551.09 
5071+680.00  2.81  5.61  10.00  56.10  1,299,494.99 
5071+700.00  2.81  5.61  10.00  56.11  1,299,438.88 
5071+720.00  2.81  5.61  10.00  56.11  1,299,382.77 
5071+740.00  2.81  5.61  10.00  56.11  1,299,326.66 
5071+760.00  2.81  5.61  10.00  56.12  1,299,270.54 
5071+780.00  2.81  5.61  10.00  56.11  1,299,214.43 
5071+800.00  2.81  5.61  10.00  56.11  1,299,158.32 
5071+820.00  2.81  5.61  10.00  56.11  1,299,102.21 
5071+840.00  2.81  5.61  10.00  56.11  1,299,046.10 
5071+860.00  2.81  5.61  10.00  56.11  1,298,989.99 
5071+880.00  2.81  5.61  10.00  56.11  1,298,933.88 
5071+900.00  2.81  5.61  10.00  56.11  1,298,877.77 
5071+920.00  2.81  5.61  10.00  56.10  1,298,821.67 
5071+940.00  2.81  5.61  10.00  56.10  1,298,765.57 
5071+960.00  2.81  5.61  10.00  56.11  1,298,709.46 
5071+980.00  2.81  5.61  10.00  56.12  1,298,653.34 
5072+000.00  2.81  5.61  10.00  56.11  1,298,597.23 
5072+020.00  2.81  5.61  10.00  56.10  1,298,541.13 
5072+040.00  2.81  5.61  10.00  56.10  1,298,485.03 
5072+060.00  2.81  5.61  10.00  56.10  1,298,428.93 
5072+080.00  2.81  5.61  10.00  56.10  1,298,372.83 
5072+100.00  2.81  5.61  10.00  56.10  1,298,316.73 
5072+120.00  2.81  5.61  10.00  56.10  1,298,260.63 
5072+140.00  2.81  5.61  10.00  56.10  1,298,204.53 
5072+145.35  2.81  5.61  2.67  15.00  1,298,189.53 
5072+160.00  2.90  5.70  7.33  41.78  1,298,147.75 
5072+165.35  2.93  5.83  2.67  15.58  1,298,132.16 
5072+175.00  2.94  5.87  4.83  28.35  1,298,103.81 
5072+180.00  2.96  5.90  2.50  14.76  1,298,089.05 
5072+185.00  2.98  5.94  2.50  14.85  1,298,074.20 
5072+195.00  3.04  6.02  5.00  30.11  1,298,044.10 
5072+200.00  3.09  6.13  2.50  15.32  1,298,028.78 
5072+205.00  3.13  6.21  2.50  15.53  1,298,013.25 
5072+215.00  3.24  6.37  5.00  31.84  1,297,981.41 
5072+220.00  3.31  6.55  2.50  16.37  1,297,965.04 
5072+225.00  3.38  6.68  2.50  16.71  1,297,948.33 
5072+235.00  3.53  6.90  5.00  34.51  1,297,913.82 
5072+240.00  3.60  7.13  2.50  17.82  1,297,896.00 
5072+245.00  3.68  7.28  2.50  18.19  1,297,877.81 

506 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5072+255.00  3.83  7.50  5.00  37.52  1,297,840.29 


5072+260.00  3.90  7.73  2.50  19.32  1,297,820.97 
5072+265.00  3.98  7.88  2.50  19.70  1,297,801.28 
5072+275.00  4.11  8.09  5.00  40.45  1,297,760.83 
5072+280.00  4.17  8.29  2.50  20.71  1,297,740.11 
5072+285.00  4.23  8.40  2.50  21.00  1,297,719.12 
5072+295.00  4.32  8.55  5.00  42.73  1,297,676.39 
5072+300.00  4.35  8.67  2.50  21.66  1,297,654.73 
5072+305.00  4.38  8.73  2.50  21.82  1,297,632.91 
5072+315.00  4.42  8.80  5.00  43.99  1,297,588.92 
5072+320.00  4.43  8.84  2.50  22.11  1,297,566.81 
5072+325.00  4.43  8.86  2.50  22.14  1,297,544.67 
5072+335.00  4.43  8.86  5.00  44.32  1,297,500.36 
5072+340.00  4.43  8.86  2.50  22.16  1,297,478.20 
5072+360.00  4.43  8.86  10.00  88.63  1,297,389.57 
5072+380.00  4.43  8.86  10.00  88.63  1,297,300.94 
5072+400.00  4.43  8.86  10.00  88.63  1,297,212.31 
5072+420.00  4.43  8.86  10.00  88.62  1,297,123.69 
5072+440.00  4.43  8.86  10.00  88.62  1,297,035.07 
5072+460.00  4.43  8.86  10.00  88.62  1,296,946.45 
5072+480.00  4.43  8.86  10.00  88.63  1,296,857.82 
5072+500.00  4.43  8.86  10.00  88.63  1,296,769.19 
5072+520.00  4.43  8.86  10.00  88.63  1,296,680.56 
5072+540.00  4.43  8.86  10.00  88.63  1,296,591.93 
5072+560.00  4.43  8.86  10.00  88.63  1,296,503.30 
5072+580.00  4.43  8.86  10.00  88.63  1,296,414.67 
5072+600.00  4.43  8.86  10.00  88.62  1,296,326.05 
5072+620.00  4.43  8.86  10.00  88.62  1,296,237.43 
5072+640.00  4.43  8.86  10.00  88.62  1,296,148.81 
5072+660.00  4.43  8.86  10.00  88.63  1,296,060.18 
5072+660.00  4.43  8.86  0.00  0.00  1,296,060.18 
5072+680.00  4.43  8.86  10.00  88.63  1,295,971.55 
5072+700.00  4.43  8.86  10.00  88.63  1,295,882.92 
5072+720.00  4.43  8.86  10.00  88.64  1,295,794.28 
5072+740.00  4.43  8.86  10.00  88.63  1,295,705.65 
5072+760.00  4.43  8.86  10.00  88.62  1,295,617.03 
5072+760.00  4.43  8.86  0.00  0.00  1,295,617.03 
5072+780.00  4.43  8.86  10.00  88.63  1,295,528.40 
5072+795.00  4.43  8.86  7.50  66.48  1,295,461.92 
5072+800.00  4.43  8.86  2.50  22.16  1,295,439.76 
5072+820.00  4.43  8.86  10.00  88.63  1,295,351.13 
5072+840.00  4.43  8.86  10.00  88.64  1,295,262.49 
5072+860.00  4.43  8.86  10.00  88.64  1,295,173.85 
5072+880.00  4.43  8.86  10.00  88.64  1,295,085.21 
5072+900.00  4.43  8.86  10.00  88.64  1,294,996.57 

507 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5072+920.00  4.43  8.86  10.00  88.64  1,294,907.93 


5072+940.00  4.43  8.86  10.00  88.64  1,294,819.29 
5072+960.00  4.43  8.86  10.00  88.64  1,294,730.65 
5072+980.00  4.43  8.86  10.00  88.64  1,294,642.01 
5073+000.00  4.43  8.86  10.00  88.64  1,294,553.37 
5073+020.00  4.43  8.86  10.00  88.64  1,294,464.73 
5073+040.00  4.43  8.86  10.00  88.64  1,294,376.09 
5073+060.00  4.43  8.86  10.00  88.64  1,294,287.45 
5073+080.00  4.43  8.86  10.00  88.64  1,294,198.81 
5073+100.00  4.43  8.86  10.00  88.64  1,294,110.17 
5073+120.00  4.43  8.86  10.00  88.64  1,294,021.53 
5073+140.00  4.43  8.86  10.00  88.64  1,293,932.89 
5073+160.00  4.43  8.86  10.00  88.64  1,293,844.25 
5073+180.00  4.43  8.86  10.00  88.64  1,293,755.61 
5073+200.00  4.43  8.86  10.00  88.64  1,293,666.97 
5073+220.00  4.43  8.86  10.00  88.64  1,293,578.33 
5073+240.00  4.43  8.86  10.00  88.64  1,293,489.69 
5073+260.00  4.43  8.86  10.00  88.64  1,293,401.05 
5073+280.00  4.43  8.86  10.00  88.64  1,293,312.41 
5073+300.00  4.43  8.86  10.00  88.64  1,293,223.77 
5073+320.00  4.43  8.86  10.00  88.64  1,293,135.13 
5073+340.00  4.43  8.86  10.00  88.64  1,293,046.49 
5073+360.00  4.43  8.86  10.00  88.63  1,292,957.86 
5073+380.00  4.43  8.86  10.00  88.63  1,292,869.23 
5073+400.00  4.43  8.86  10.00  88.63  1,292,780.60 
5073+420.00  4.43  8.86  10.00  88.62  1,292,691.98 
5073+440.00  4.43  8.86  10.00  88.62  1,292,603.36 
5073+460.00  4.43  8.86  10.00  88.63  1,292,514.73 
5073+480.00  4.43  8.86  10.00  88.64  1,292,426.09 
5073+500.00  4.43  8.86  10.00  88.63  1,292,337.46 
5073+520.00  4.43  8.86  10.00  88.62  1,292,248.84 
5073+540.00  4.43  8.86  10.00  88.63  1,292,160.21 
5073+560.00  4.43  8.86  10.00  88.64  1,292,071.57 
5073+580.00  4.43  8.86  10.00  88.63  1,291,982.94 
5073+600.00  4.43  8.86  10.00  88.62  1,291,894.32 
5073+620.00  4.43  8.86  10.00  88.63  1,291,805.69 
5073+640.00  4.43  8.86  10.00  88.64  1,291,717.05 
5073+660.00  4.43  8.86  10.00  88.63  1,291,628.42 
5073+680.00  4.43  8.86  10.00  88.62  1,291,539.80 
5073+700.00  4.43  8.86  10.00  88.62  1,291,451.18 
5073+720.00  4.43  8.86  10.00  88.62  1,291,362.56 
5073+740.00  4.43  8.86  10.00  88.63  1,291,273.93 
5073+760.00  4.43  8.86  10.00  88.63  1,291,185.30 
5073+780.00  4.43  8.86  10.00  88.63  1,291,096.67 
5073+800.00  4.43  8.86  10.00  88.64  1,291,008.03 

508 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5073+815.00  4.43  8.86  7.50  66.48  1,290,941.55 


5073+820.00  4.43  8.86  2.50  22.16  1,290,919.39 
5073+825.00  4.43  8.86  2.50  22.16  1,290,897.23 
5073+835.00  4.42  8.85  5.00  44.26  1,290,852.97 
5073+840.00  4.40  8.82  2.50  22.06  1,290,830.91 
5073+845.00  4.38  8.79  2.50  21.96  1,290,808.95 
5073+855.00  4.32  8.71  5.00  43.53  1,290,765.43 
5073+860.00  4.28  8.60  2.50  21.50  1,290,743.93 
5073+865.00  4.24  8.51  2.50  21.28  1,290,722.64 
5073+875.00  4.12  8.36  5.00  41.79  1,290,680.85 
5073+880.00  4.06  8.18  2.50  20.45  1,290,660.41 
5073+885.00  3.99  8.04  2.50  20.10  1,290,640.31 
5073+895.00  3.84  7.82  5.00  39.11  1,290,601.20 
5073+900.00  3.76  7.60  2.50  18.99  1,290,582.20 
5073+905.00  3.69  7.45  2.50  18.62  1,290,563.59 
5073+915.00  3.54  7.22  5.00  36.12  1,290,527.47 
5073+920.00  3.46  7.00  2.50  17.50  1,290,509.97 
5073+925.00  3.39  6.85  2.50  17.12  1,290,492.85 
5073+935.00  3.25  6.64  5.00  33.18  1,290,459.68 
5073+940.00  3.19  6.44  2.50  16.10  1,290,443.58 
5073+945.00  3.14  6.33  2.50  15.82  1,290,427.76 
5073+955.00  3.05  6.18  5.00  30.91  1,290,396.85 
5073+960.00  3.02  6.06  2.50  15.16  1,290,381.69 
5073+965.00  2.98  6.00  2.50  15.00  1,290,366.70 
5073+975.00  2.95  5.93  5.00  29.64  1,290,337.06 
5073+980.00  2.94  5.88  2.50  14.71  1,290,322.35 
5073+985.32  2.93  5.87  2.66  15.61  1,290,306.75 
5074+000.00  2.84  5.77  7.34  42.37  1,290,264.38 
5074+005.32  2.81  5.65  2.66  15.01  1,290,249.37 
5074+020.00  2.81  5.61  7.34  41.20  1,290,208.17 
5074+040.00  2.81  5.61  10.00  56.12  1,290,152.05 
5074+060.00  2.81  5.61  10.00  56.12  1,290,095.93 
5074+080.00  2.81  5.61  10.00  56.12  1,290,039.81 
5074+100.00  2.81  5.61  10.00  56.12  1,289,983.69 
5074+120.00  2.81  5.61  10.00  56.12  1,289,927.57 
5074+140.00  2.81  5.61  10.00  56.12  1,289,871.45 
5074+160.00  2.81  5.61  10.00  56.12  1,289,815.33 
5074+180.00  2.81  5.61  10.00  56.12  1,289,759.21 
5074+200.00  2.81  5.61  10.00  56.12  1,289,703.09 
5074+220.00  2.81  5.61  10.00  56.12  1,289,646.97 
5074+240.00  2.81  5.61  10.00  56.12  1,289,590.85 
5074+260.00  2.81  5.61  10.00  56.12  1,289,534.73 
5074+280.00  2.81  5.61  10.00  56.12  1,289,478.61 
5074+300.00  2.81  5.61  10.00  56.12  1,289,422.49 
5074+320.00  2.81  5.61  10.00  56.12  1,289,366.37 

509 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5074+340.00  2.81  5.61  10.00  56.12  1,289,310.25 


5074+360.00  2.81  5.61  10.00  56.12  1,289,254.13 
5074+380.00  2.81  5.61  10.00  56.12  1,289,198.01 
5074+400.00  2.81  5.61  10.00  56.12  1,289,141.89 
5074+400.19  2.81  5.61  0.09  0.53  1,289,141.36 
6000+617.91  2.81  2.81        1,300,000.00 
6000+620.00  2.81  5.61  1.04  5.86  1,299,994.14 
6000+640.00  2.81  5.61  10.00  56.12  1,299,938.02 
6000+660.00  2.81  5.61  10.00  56.12  1,299,881.90 
6000+680.00  2.81  5.61  10.00  56.12  1,299,825.78 
6000+700.00  2.81  5.61  10.00  56.12  1,299,769.66 
6000+700.01  2.81  5.61  0.00  0.03  1,299,769.64 
6000+720.00  2.81  5.61  10.00  56.09  1,299,713.54 
6000+740.00  2.81  5.61  10.00  56.12  1,299,657.42 
6000+760.00  2.81  5.61  10.00  56.12  1,299,601.30 
6000+780.00  2.81  5.61  10.00  56.12  1,299,545.18 
6000+800.00  2.81  5.61  10.00  56.12  1,299,489.06 
6000+800.00  2.81  5.61  0.00  0.00  1,299,489.06 
6000+820.00  2.81  5.61  10.00  56.12  1,299,432.94 
6000+840.00  2.81  5.61  10.00  56.12  1,299,376.82 
6000+860.00  2.81  5.61  10.00  56.12  1,299,320.70 
6000+880.00  2.81  5.61  10.00  56.12  1,299,264.58 
6000+880.00  2.81  5.61  0.00  0.00  1,299,264.58 
6000+900.00  2.81  5.61  10.00  56.12  1,299,208.46 
6000+920.00  2.81  5.61  10.00  56.12  1,299,152.34 
6000+940.00  2.81  5.61  10.00  56.12  1,299,096.22 
6000+960.00  2.81  5.61  10.00  56.12  1,299,040.10 
6000+980.00  2.81  5.61  10.00  56.12  1,298,983.98 
6001+000.00  2.81  5.61  10.00  56.12  1,298,927.86 
6001+020.00  2.81  5.61  10.00  56.12  1,298,871.74 
6001+040.00  2.81  5.61  10.00  56.12  1,298,815.62 
6001+060.00  2.81  5.61  10.00  56.12  1,298,759.50 
6001+080.00  2.81  5.61  10.00  56.12  1,298,703.38 
6001+100.00  2.81  5.61  10.00  56.12  1,298,647.26 
6001+120.00  2.81  5.61  10.00  56.12  1,298,591.14 
6001+140.00  2.81  5.61  10.00  56.12  1,298,535.02 
6001+160.00  2.81  5.61  10.00  56.12  1,298,478.90 
6001+180.00  2.81  5.61  10.00  56.12  1,298,422.78 
6001+200.00  2.81  5.61  10.00  56.12  1,298,366.66 
6001+220.00  2.81  5.61  10.00  56.12  1,298,310.54 
6001+240.00  2.81  5.61  10.00  56.12  1,298,254.42 
6001+260.00  2.81  5.61  10.00  56.12  1,298,198.30 
6001+280.00  2.81  5.61  10.00  56.12  1,298,142.18 
6001+300.00  2.81  5.61  10.00  56.12  1,298,086.06 
6001+320.00  2.81  5.61  10.00  56.12  1,298,029.94 

510 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6001+340.00  2.81  5.61  10.00  56.12  1,297,973.82 


6001+360.00  2.81  5.61  10.00  56.12  1,297,917.70 
6001+380.00  2.81  5.61  10.00  56.12  1,297,861.58 
6001+400.00  2.81  5.61  10.00  56.12  1,297,805.46 
6001+420.00  2.81  5.61  10.00  56.12  1,297,749.34 
6001+440.00  2.81  5.61  10.00  56.11  1,297,693.23 
6001+460.00  2.81  5.61  10.00  56.10  1,297,637.13 
6001+480.00  2.81  5.61  10.00  56.11  1,297,581.02 
6001+500.00  2.81  5.61  10.00  56.11  1,297,524.91 
6001+520.00  2.81  5.61  10.00  56.11  1,297,468.80 
6001+540.00  2.81  5.61  10.00  56.11  1,297,412.69 
6001+560.00  2.81  5.61  10.00  56.10  1,297,356.59 
6001+580.00  2.81  5.61  10.00  56.11  1,297,300.48 
6001+600.00  2.81  5.61  10.00  56.12  1,297,244.36 
6001+620.00  2.81  5.61  10.00  56.11  1,297,188.25 
6001+640.00  2.81  5.61  10.00  56.10  1,297,132.15 
6001+660.00  2.81  5.61  10.00  56.10  1,297,076.05 
6001+680.00  2.81  5.61  10.00  56.11  1,297,019.94 
6001+700.00  2.81  5.61  10.00  56.12  1,296,963.82 
6001+720.00  2.81  5.61  10.00  56.11  1,296,907.71 
6001+740.00  2.81  5.61  10.00  56.10  1,296,851.61 
6001+760.00  2.81  5.61  10.00  56.10  1,296,795.51 
6001+780.00  2.81  5.61  10.00  56.10  1,296,739.41 
6001+800.00  2.81  5.61  10.00  56.10  1,296,683.31 
6001+820.00  2.81  5.61  10.00  56.11  1,296,627.20 
6001+840.00  2.81  5.61  10.00  56.11  1,296,571.09 
6001+860.00  2.81  5.61  10.00  56.10  1,296,514.99 
6001+880.00  2.81  5.61  10.00  56.10  1,296,458.89 
6001+900.00  2.81  5.61  10.00  56.10  1,296,402.79 
6001+920.00  2.81  5.61  10.00  56.10  1,296,346.69 
6001+940.00  2.81  5.61  10.00  56.11  1,296,290.58 
6001+960.00  2.81  5.61  10.00  56.11  1,296,234.47 
6001+980.00  2.81  5.61  10.00  56.11  1,296,178.36 
6002+000.00  2.81  5.61  10.00  56.11  1,296,122.25 
6002+020.00  2.81  5.61  10.00  56.11  1,296,066.14 
6002+040.00  2.81  5.61  10.00  56.11  1,296,010.03 
6002+060.00  2.81  5.61  10.00  56.10  1,295,953.93 
6002+080.00  2.81  5.61  10.00  56.10  1,295,897.83 
6002+100.00  2.81  5.61  10.00  56.11  1,295,841.72 
6002+120.00  2.81  5.61  10.00  56.11  1,295,785.61 
6002+140.00  2.81  5.61  10.00  56.10  1,295,729.51 
6002+160.00  2.81  5.61  10.00  56.10  1,295,673.41 
6002+180.00  2.81  5.61  10.00  56.11  1,295,617.30 
6002+200.00  2.81  5.61  10.00  56.11  1,295,561.19 
6002+220.00  2.81  5.61  10.00  56.10  1,295,505.09 

511 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6002+240.00  2.81  5.61  10.00  56.11  1,295,448.98 


6002+260.00  2.81  5.61  10.00  56.12  1,295,392.86 
6002+280.00  2.81  5.61  10.00  56.12  1,295,336.74 
6002+300.00  2.81  5.61  10.00  56.12  1,295,280.62 
6002+320.00  2.81  5.61  10.00  56.12  1,295,224.50 
6002+340.00  2.81  5.61  10.00  56.12  1,295,168.38 
6002+360.00  2.81  5.61  10.00  56.12  1,295,112.26 
6002+380.00  2.81  5.61  10.00  56.12  1,295,056.14 
6002+400.00  2.81  5.61  10.00  56.12  1,295,000.02 
6002+420.00  2.81  5.61  10.00  56.12  1,294,943.90 
6002+440.00  2.81  5.61  10.00  56.12  1,294,887.78 
6002+460.00  2.81  5.61  10.00  56.12  1,294,831.66 
6002+480.00  2.81  5.61  10.00  56.12  1,294,775.54 
6002+500.00  2.81  5.61  10.00  56.12  1,294,719.42 
6002+520.00  2.81  5.61  10.00  56.12  1,294,663.30 
6002+540.00  2.81  5.61  10.00  56.12  1,294,607.18 
6002+560.00  2.81  5.61  10.00  56.11  1,294,551.07 
6002+580.00  2.81  5.61  10.00  56.11  1,294,494.96 
6002+600.00  2.81  5.61  10.00  56.11  1,294,438.85 
6002+620.00  2.81  5.61  10.00  56.10  1,294,382.75 
6002+640.00  2.81  5.61  10.00  56.10  1,294,326.65 
6002+660.00  2.81  5.61  10.00  56.10  1,294,270.55 
6002+680.00  2.81  5.61  10.00  56.10  1,294,214.45 
6002+700.00  2.81  5.61  10.00  56.11  1,294,158.34 
6002+720.00  2.81  5.61  10.00  56.11  1,294,102.23 
6002+740.00  2.81  5.61  10.00  56.10  1,294,046.13 
6002+760.00  2.81  5.61  10.00  56.11  1,293,990.02 
6002+780.00  2.81  5.61  10.00  56.12  1,293,933.90 
6002+800.00  2.81  5.61  10.00  56.11  1,293,877.79 
6002+820.00  2.81  5.61  10.00  56.10  1,293,821.69 
6002+830.00  2.81  5.61  5.00  28.05  1,293,793.64 
6002+830.00  2.81  5.61  0.00  0.00  1,293,793.64 
6002+840.00  2.81  5.61  5.00  28.05  1,293,765.59 
6002+860.00  2.81  5.61  10.00  56.10  1,293,709.49 
6002+880.00  2.81  5.61  10.00  56.10  1,293,653.39 
6002+900.00  2.81  5.61  10.00  56.10  1,293,597.29 
6002+920.00  2.81  5.61  10.00  56.11  1,293,541.18 
6002+940.00  2.81  5.61  10.00  56.11  1,293,485.07 
6002+960.00  2.81  5.61  10.00  56.10  1,293,428.97 
6002+980.00  2.81  5.61  10.00  56.10  1,293,372.87 
6002+980.00  2.81  5.61  0.00  0.00  1,293,372.87 
6003+000.00  2.81  5.61  10.00  56.11  1,293,316.76 
6003+020.00  2.81  5.61  10.00  56.11  1,293,260.65 
6003+040.00  2.81  5.61  10.00  56.10  1,293,204.55 
6003+060.00  2.81  5.61  10.00  56.10  1,293,148.45 

512 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6003+080.00  2.81  5.61  10.00  56.11  1,293,092.34 


6003+100.00  2.81  5.61  10.00  56.11  1,293,036.23 
6003+120.00  2.81  5.61  10.00  56.10  1,292,980.13 
6003+140.00  2.81  5.61  10.00  56.10  1,292,924.03 
6003+160.00  2.81  5.61  10.00  56.11  1,292,867.92 
6003+180.00  2.81  5.61  10.00  56.11  1,292,811.81 
6003+200.00  2.81  5.61  10.00  56.10  1,292,755.71 
6003+220.00  2.81  5.61  10.00  56.11  1,292,699.60 
6003+240.00  2.81  5.61  10.00  56.11  1,292,643.49 
6003+260.00  2.81  5.61  10.00  56.10  1,292,587.39 
6003+280.00  2.81  5.61  10.00  56.10  1,292,531.29 
6003+300.00  2.81  5.61  10.00  56.11  1,292,475.18 
6003+320.00  2.81  5.61  10.00  56.12  1,292,419.06 
6003+340.00  2.81  5.61  10.00  56.11  1,292,362.95 
6003+360.00  2.81  5.61  10.00  56.10  1,292,306.85 
6003+380.00  2.81  5.61  10.00  56.11  1,292,250.74 
6003+400.00  2.81  5.61  10.00  56.12  1,292,194.62 
6003+420.00  2.81  5.61  10.00  56.11  1,292,138.51 
6003+440.00  2.81  5.61  10.00  56.10  1,292,082.41 
6003+460.00  2.81  5.61  10.00  56.11  1,292,026.30 
6003+480.00  2.81  5.61  10.00  56.12  1,291,970.18 
6003+500.00  2.81  5.61  10.00  56.11  1,291,914.07 
6003+520.00  2.81  5.61  10.00  56.10  1,291,857.97 
6003+536.24  2.81  5.61  8.12  45.56  1,291,812.41 
6003+536.24  0.00  2.81  0.00  0.00  1,291,812.41 
6003+536.24  0.00  0.00  0.00  0.00  1,291,812.41 
6003+540.00  0.00  0.00  1.88  0.00  1,291,812.41 
6003+560.00  0.00  0.00  10.00  0.00  1,291,812.41 
6003+568.24  0.00  0.00  4.12  0.00  1,291,812.41 
6003+568.24  0.00  0.00  0.00  0.00  1,291,812.41 
6003+568.24  2.81  2.81  0.00  0.00  1,291,812.41 
6003+580.00  2.81  5.61  5.88  32.99  1,291,779.42 
6003+600.00  2.81  5.61  10.00  56.10  1,291,723.32 
6003+620.00  2.81  5.61  10.00  56.11  1,291,667.21 
6003+640.00  2.81  5.61  10.00  56.12  1,291,611.09 
6003+660.00  2.81  5.61  10.00  56.11  1,291,554.98 
6003+680.00  2.81  5.61  10.00  56.10  1,291,498.88 
6003+700.00  2.81  5.61  10.00  56.11  1,291,442.77 
6003+720.00  2.81  5.61  10.00  56.12  1,291,386.65 
6003+740.00  2.81  5.61  10.00  56.11  1,291,330.54 
6003+760.00  2.81  5.61  10.00  56.10  1,291,274.44 
6003+780.00  2.81  5.61  10.00  56.10  1,291,218.34 
6003+800.00  2.81  5.61  10.00  56.10  1,291,162.24 
6003+820.00  2.81  5.61  10.00  56.10  1,291,106.14 
6003+840.00  2.81  5.61  10.00  56.11  1,291,050.03 

513 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6003+860.00  2.81  5.61  10.00  56.11  1,290,993.92 


6003+880.00  2.81  5.61  10.00  56.10  1,290,937.82 
6003+900.00  2.81  5.61  10.00  56.11  1,290,881.71 
6003+900.00  2.81  5.61  0.00  0.00  1,290,881.71 
6003+920.00  2.81  5.61  10.00  56.12  1,290,825.59 
6003+940.00  2.81  5.61  10.00  56.11  1,290,769.48 
6003+960.00  2.81  5.61  10.00  56.10  1,290,713.38 
6003+974.92  2.81  5.61  7.46  41.86  1,290,671.52 
6003+980.00  2.81  5.61  2.54  14.24  1,290,657.28 
6004+000.00  2.81  5.61  10.00  56.10  1,290,601.18 
6004+020.00  2.81  5.61  10.00  56.11  1,290,545.07 
6004+040.00  2.81  5.61  10.00  56.11  1,290,488.96 
6004+060.00  2.81  5.61  10.00  56.11  1,290,432.85 
6004+080.00  2.81  5.61  10.00  56.11  1,290,376.74 
6004+100.00  2.81  5.61  10.00  56.11  1,290,320.63 
6004+120.00  2.81  5.61  10.00  56.11  1,290,264.52 
6004+124.92  2.81  5.61  2.46  13.81  1,290,250.71 
6004+140.00  2.81  5.61  7.54  42.30  1,290,208.41 
6004+160.00  2.81  5.61  10.00  56.12  1,290,152.29 
6004+180.00  2.81  5.61  10.00  56.11  1,290,096.18 
6004+200.00  2.81  5.61  10.00  56.10  1,290,040.08 
6004+220.00  2.81  5.61  10.00  56.10  1,289,983.98 
6004+240.00  2.81  5.61  10.00  56.10  1,289,927.88 
6004+260.00  2.81  5.61  10.00  56.10  1,289,871.78 
6004+280.00  2.81  5.61  10.00  56.11  1,289,815.67 
6004+300.00  2.81  5.61  10.00  56.11  1,289,759.56 
6004+320.00  2.81  5.61  10.00  56.10  1,289,703.46 
6004+340.00  2.81  5.61  10.00  56.11  1,289,647.35 
6004+355.41  2.81  5.61  7.71  43.24  1,289,604.11 
6004+360.00  2.81  5.61  2.29  12.86  1,289,591.24 
6004+380.00  2.81  5.61  10.00  56.11  1,289,535.13 
6004+400.00  2.81  5.61  10.00  56.12  1,289,479.01 
6004+420.00  2.81  5.61  10.00  56.11  1,289,422.90 
6004+440.00  2.81  5.61  10.00  56.10  1,289,366.80 
6004+460.00  2.81  5.61  10.00  56.10  1,289,310.70 
6004+480.00  2.81  5.61  10.00  56.10  1,289,254.60 
6004+500.00  2.81  5.61  10.00  56.10  1,289,198.50 
6004+505.41  2.81  5.61  2.71  15.19  1,289,183.32 
6004+520.00  2.81  5.61  7.29  40.91  1,289,142.40 
6004+540.00  2.81  5.61  10.00  56.10  1,289,086.30 
6004+560.00  2.81  5.61  10.00  56.10  1,289,030.20 
6004+580.00  2.81  5.61  10.00  56.10  1,288,974.10 
6004+600.00  2.81  5.61  10.00  56.10  1,288,918.00 
6004+615.00  2.81  5.61  7.50  42.08  1,288,875.93 
6004+615.00  2.81  5.61  0.00  0.00  1,288,875.93 

514 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6004+620.00  2.81  5.61  2.50  14.03  1,288,861.90 


6004+640.00  2.81  5.61  10.00  56.10  1,288,805.80 
6004+660.00  2.81  5.61  10.00  56.10  1,288,749.70 
6004+680.00  2.81  5.61  10.00  56.10  1,288,693.60 
6004+700.00  2.81  5.61  10.00  56.10  1,288,637.50 
6004+720.00  2.81  5.61  10.00  56.11  1,288,581.39 
6004+740.00  2.81  5.61  10.00  56.11  1,288,525.28 
6004+760.00  2.81  5.61  10.00  56.11  1,288,469.17 
6004+780.00  2.81  5.61  10.00  56.11  1,288,413.06 
6004+800.00  2.81  5.61  10.00  56.10  1,288,356.96 
6004+820.00  2.81  5.61  10.00  56.10  1,288,300.86 
6004+840.00  2.81  5.61  10.00  56.11  1,288,244.75 
6004+860.00  2.81  5.61  10.00  56.11  1,288,188.64 
6004+880.00  2.81  5.61  10.00  56.11  1,288,132.53 
6004+900.00  2.81  5.61  10.00  56.11  1,288,076.42 
6004+920.00  2.81  5.61  10.00  56.10  1,288,020.32 
6004+940.00  2.81  5.61  10.00  56.11  1,287,964.21 
6004+960.00  2.81  5.61  10.00  56.11  1,287,908.10 
6004+980.00  2.81  5.61  10.00  56.10  1,287,852.00 
6005+000.00  2.81  5.61  10.00  56.11  1,287,795.89 
6005+020.00  2.81  5.61  10.00  56.11  1,287,739.78 
6005+040.00  2.81  5.61  10.00  56.10  1,287,683.68 
6005+060.00  2.81  5.61  10.00  56.11  1,287,627.57 
6005+080.00  2.81  5.61  10.00  56.11  1,287,571.46 
6005+100.00  2.81  5.61  10.00  56.10  1,287,515.36 
6005+104.49  2.81  5.61  2.24  12.59  1,287,502.77 
6005+120.00  2.81  5.61  7.76  43.52  1,287,459.25 
6005+140.00  2.81  5.61  10.00  56.11  1,287,403.14 
6005+160.00  2.81  5.61  10.00  56.11  1,287,347.03 
6005+180.00  2.81  5.61  10.00  56.10  1,287,290.93 
6005+200.00  2.81  5.61  10.00  56.11  1,287,234.82 
6005+220.00  2.81  5.61  10.00  56.11  1,287,178.71 
6005+240.00  2.81  5.61  10.00  56.10  1,287,122.61 
6005+254.49  2.81  5.61  7.24  40.64  1,287,081.97 
6005+260.00  2.81  5.61  2.76  15.46  1,287,066.51 
6005+280.00  2.81  5.61  10.00  56.10  1,287,010.41 
6005+300.00  2.81  5.61  10.00  56.10  1,286,954.31 
6005+320.00  2.81  5.61  10.00  56.10  1,286,898.21 
6005+340.00  2.81  5.61  10.00  56.10  1,286,842.11 
6005+360.00  2.81  5.61  10.00  56.10  1,286,786.01 
6005+361.69  2.81  5.61  0.85  4.75  1,286,781.27 
6005+380.00  2.81  5.61  9.15  51.35  1,286,729.91 
6005+400.00  2.81  5.61  10.00  56.10  1,286,673.81 
6005+420.00  2.81  5.61  10.00  56.10  1,286,617.71 
6005+440.00  2.81  5.61  10.00  56.11  1,286,561.60 

515 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6005+460.00  2.81  5.61  10.00  56.11  1,286,505.49 


6005+480.00  2.81  5.61  10.00  56.10  1,286,449.39 
6005+500.00  2.81  5.61  10.00  56.11  1,286,393.28 
6005+511.69  2.81  5.61  5.85  32.81  1,286,360.47 
6005+520.00  2.81  5.61  4.15  23.31  1,286,337.16 
6005+540.00  2.81  5.61  10.00  56.12  1,286,281.04 
6005+560.00  2.81  5.61  10.00  56.12  1,286,224.92 
6005+580.00  2.81  5.61  10.00  56.12  1,286,168.80 
6005+600.00  2.81  5.61  10.00  56.12  1,286,112.68 
6005+620.00  2.81  5.61  10.00  56.12  1,286,056.56 
6005+640.00  2.81  5.61  10.00  56.12  1,286,000.44 
6005+660.00  2.81  5.61  10.00  56.12  1,285,944.32 
6005+680.00  2.81  5.61  10.00  56.12  1,285,888.20 
6005+700.00  2.81  5.61  10.00  56.12  1,285,832.08 
6005+720.00  2.81  5.61  10.00  56.12  1,285,775.96 
6005+740.00  2.81  5.61  10.00  56.12  1,285,719.84 
6005+760.00  2.81  5.61  10.00  56.12  1,285,663.72 
6005+780.00  2.81  5.61  10.00  56.12  1,285,607.60 
6005+800.00  2.81  5.61  10.00  56.12  1,285,551.48 
6005+820.00  2.81  5.61  10.00  56.12  1,285,495.36 
6005+840.00  2.81  5.61  10.00  56.12  1,285,439.24 
6005+860.00  2.81  5.61  10.00  56.12  1,285,383.12 
6005+880.00  2.81  5.61  10.00  56.12  1,285,327.00 
6005+900.00  2.81  5.61  10.00  56.12  1,285,270.88 
6005+920.00  2.81  5.61  10.00  56.12  1,285,214.76 
6005+940.00  2.81  5.61  10.00  56.12  1,285,158.64 
6005+960.00  2.81  5.61  10.00  56.12  1,285,102.52 
6005+980.00  2.81  5.61  10.00  56.12  1,285,046.40 
6006+000.00  2.81  5.61  10.00  56.12  1,284,990.28 
 

TABLA 38 CÁLCULO DE ACARREOS DE SUB‐BALASTO DEL TRAMO 6017+000 AL 6030+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6017+000.00  4.16  4.16        1,300,000.00 


6017+020.00  4.16  8.32  10.00  83.22  1,299,916.78 
6017+027.24  4.16  8.32  3.62  30.12  1,299,886.66 
6017+040.00  4.16  8.32  6.38  53.10  1,299,833.56 
6017+060.00  4.16  8.32  10.00  83.22  1,299,750.34 
6017+080.00  4.16  8.32  10.00  83.22  1,299,667.12 
6017+100.00  4.16  8.32  10.00  83.22  1,299,583.90 

516 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6017+120.00  4.16  8.32  10.00  83.22  1,299,500.68 


6017+140.00  4.16  8.32  10.00  83.22  1,299,417.46 
6017+160.00  4.16  8.32  10.00  83.22  1,299,334.24 
6017+180.00  4.16  8.32  10.00  83.22  1,299,251.02 
6017+200.00  4.16  8.32  10.00  83.22  1,299,167.80 
6017+220.00  4.16  8.32  10.00  83.22  1,299,084.58 
6017+240.00  4.16  8.32  10.00  83.22  1,299,001.36 
6017+260.00  4.16  8.32  10.00  83.22  1,298,918.14 
6017+280.00  4.16  8.32  10.00  83.22  1,298,834.92 
6017+300.00  4.16  8.32  10.00  83.22  1,298,751.70 
6017+320.00  4.16  8.32  10.00  83.22  1,298,668.48 
6017+340.00  4.16  8.32  10.00  83.22  1,298,585.26 
6017+360.00  4.16  8.32  10.00  83.22  1,298,502.04 
6017+380.00  4.16  8.32  10.00  83.22  1,298,418.82 
6017+400.00  4.16  8.32  10.00  83.22  1,298,335.60 
6017+420.00  4.16  8.32  10.00  83.22  1,298,252.38 
6017+440.00  4.16  8.32  10.00  83.22  1,298,169.16 
6017+460.00  4.16  8.32  10.00  83.22  1,298,085.94 
6017+480.00  4.16  8.32  10.00  83.22  1,298,002.72 
6017+500.00  4.16  8.32  10.00  83.22  1,297,919.50 
6017+520.00  4.16  8.32  10.00  83.22  1,297,836.28 
6017+540.00  4.16  8.32  10.00  83.22  1,297,753.06 
6017+560.00  4.16  8.32  10.00  83.22  1,297,669.84 
6017+579.55  4.16  8.32  9.78  81.36  1,297,588.48 
6017+580.00  4.16  8.32  0.22  1.86  1,297,586.62 
6017+600.00  4.16  8.32  10.00  83.22  1,297,503.40 
6017+606.68  4.16  8.32  3.34  27.80  1,297,475.60 
6017+606.68  0.00  4.16  0.00  0.00  1,297,475.60 
6017+606.68  0.00  0.00  0.00  0.00  1,297,475.60 
6017+620.00  0.00  0.00  6.66  0.00  1,297,475.60 
6017+640.00  0.00  0.00  10.00  0.00  1,297,475.60 
6017+660.00  0.00  0.00  10.00  0.00  1,297,475.60 
6017+670.68  0.00  0.00  5.34  0.00  1,297,475.60 
6017+670.68  0.00  0.00  0.00  0.00  1,297,475.60 
6017+670.68  4.16  4.16  0.00  0.00  1,297,475.60 
6017+680.00  4.16  8.32  4.66  38.77  1,297,436.82 
6017+700.00  4.16  8.32  10.00  83.22  1,297,353.60 
6017+720.00  4.16  8.32  10.00  83.22  1,297,270.38 
6017+729.55  4.16  8.32  4.78  39.75  1,297,230.63 
6017+740.00  4.16  8.32  5.22  43.47  1,297,187.16 
6017+760.00  4.16  8.32  10.00  83.22  1,297,103.94 
6017+780.00  4.16  8.32  10.00  83.22  1,297,020.72 
6017+800.00  4.16  8.32  10.00  83.22  1,296,937.50 
6017+820.00  4.16  8.32  10.00  83.22  1,296,854.28 
6017+840.00  4.16  8.32  10.00  83.22  1,296,771.06 

517 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6017+860.00  4.16  8.32  10.00  83.22  1,296,687.84 


6017+880.00  4.16  8.32  10.00  83.22  1,296,604.62 
6017+900.00  4.16  8.32  10.00  83.22  1,296,521.40 
6017+902.74  4.16  8.32  1.37  11.41  1,296,509.99 
6017+920.00  4.16  8.32  8.63  71.81  1,296,438.18 
6017+940.00  4.16  8.32  10.00  83.22  1,296,354.96 
6017+960.00  4.16  8.32  10.00  83.22  1,296,271.74 
6017+980.00  4.16  8.32  10.00  83.22  1,296,188.52 
6018+000.00  4.16  8.32  10.00  83.22  1,296,105.30 
6018+020.00  4.16  8.32  10.00  83.22  1,296,022.08 
6018+040.00  4.16  8.32  10.00  83.22  1,295,938.86 
6018+052.74  4.16  8.32  6.37  53.02  1,295,885.84 
6018+060.00  4.16  8.32  3.63  30.20  1,295,855.64 
6018+080.00  4.16  8.32  10.00  83.22  1,295,772.42 
6018+100.00  4.16  8.32  10.00  83.22  1,295,689.20 
6018+120.00  4.16  8.32  10.00  83.22  1,295,605.98 
6018+140.00  4.16  8.32  10.00  83.22  1,295,522.76 
6018+160.00  4.16  8.32  10.00  83.22  1,295,439.54 
6018+180.00  4.16  8.32  10.00  83.22  1,295,356.32 
6018+200.00  4.16  8.32  10.00  83.22  1,295,273.10 
6018+220.00  4.16  8.32  10.00  83.22  1,295,189.88 
6018+240.00  4.16  8.32  10.00  83.22  1,295,106.66 
6018+250.00  4.16  8.32  5.00  41.61  1,295,065.05 
6018+250.00  4.16  8.32  0.00  0.00  1,295,065.05 
6018+260.00  4.16  8.32  5.00  41.61  1,295,023.44 
6018+280.00  4.16  8.32  10.00  83.22  1,294,940.22 
6018+300.00  4.16  8.32  10.00  83.22  1,294,857.00 
6018+320.00  4.16  8.32  10.00  83.22  1,294,773.78 
6018+340.00  4.16  8.32  10.00  83.22  1,294,690.56 
6018+360.00  4.16  8.32  10.00  83.22  1,294,607.34 
6018+380.00  4.16  8.32  10.00  83.22  1,294,524.12 
6018+400.00  4.16  8.32  10.00  83.22  1,294,440.90 
6018+420.00  4.16  8.32  10.00  83.22  1,294,357.68 
6018+440.00  4.16  8.32  10.00  83.22  1,294,274.46 
6018+460.00  4.16  8.32  10.00  83.22  1,294,191.24 
6018+480.00  4.16  8.32  10.00  83.22  1,294,108.02 
6018+500.00  4.16  8.32  10.00  83.22  1,294,024.80 
6018+520.00  4.16  8.32  10.00  83.22  1,293,941.58 
6018+540.00  4.16  8.32  10.00  83.22  1,293,858.36 
6018+560.00  4.16  8.32  10.00  83.22  1,293,775.14 
6018+580.00  4.16  8.32  10.00  83.22  1,293,691.92 
6018+600.00  4.16  8.32  10.00  83.22  1,293,608.70 
6018+620.00  4.16  8.32  10.00  83.22  1,293,525.48 
6018+640.00  4.16  8.32  10.00  83.22  1,293,442.26 
6018+660.00  4.16  8.32  10.00  83.22  1,293,359.04 

518 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6018+680.00  4.16  8.32  10.00  83.22  1,293,275.82 


6018+700.00  4.16  8.32  10.00  83.22  1,293,192.60 
6018+720.00  4.16  8.32  10.00  83.22  1,293,109.38 
6018+727.00  4.20  8.36  3.50  29.25  1,293,080.13 
6018+740.00  4.31  8.51  6.50  55.28  1,293,024.85 
6018+747.00  4.37  8.68  3.50  30.37  1,292,994.48 
6018+757.00  4.41  8.78  5.00  43.88  1,292,950.60 
6018+760.00  4.44  8.85  1.50  13.27  1,292,937.33 
6018+767.00  4.52  8.97  3.50  31.38  1,292,905.95 
6018+777.00  4.72  9.24  5.00  46.20  1,292,859.75 
6018+780.00  4.80  9.51  1.50  14.27  1,292,845.48 
6018+787.00  4.98  9.77  3.50  34.21  1,292,811.27 
6018+797.00  5.25  10.23  5.00  51.14  1,292,760.13 
6018+800.00  5.33  10.58  1.50  15.87  1,292,744.26 
6018+807.00  5.52  10.85  3.50  37.98  1,292,706.28 
6018+817.00  5.79  11.31  5.00  56.57  1,292,649.71 
6018+820.00  5.87  11.66  1.50  17.49  1,292,632.22 
6018+827.00  6.05  11.92  3.50  41.73  1,292,590.49 
6018+837.00  6.25  12.30  5.00  61.50  1,292,528.99 
6018+840.00  6.28  12.53  1.50  18.79  1,292,510.20 
6018+847.00  6.36  12.64  3.50  44.25  1,292,465.96 
6018+857.00  6.40  12.76  5.00  63.81  1,292,402.15 
6018+860.00  6.40  12.80  1.50  19.20  1,292,382.95 
6018+867.00  6.40  12.80  3.50  44.79  1,292,338.16 
6018+880.00  6.40  12.80  6.50  83.19  1,292,254.97 
6018+900.00  6.40  12.80  10.00  127.98  1,292,126.99 
6018+920.00  6.40  12.80  10.00  127.98  1,291,999.01 
6018+940.00  6.40  12.80  10.00  127.98  1,291,871.03 
6018+960.00  6.40  12.80  10.00  127.98  1,291,743.05 
6018+980.00  6.40  12.80  10.00  127.98  1,291,615.07 
6019+000.00  6.40  12.80  10.00  127.98  1,291,487.09 
6019+020.00  6.40  12.80  10.00  127.98  1,291,359.11 
6019+040.00  6.40  12.80  10.00  127.98  1,291,231.13 
6019+060.00  6.40  12.80  10.00  127.98  1,291,103.15 
6019+070.00  6.40  12.80  5.00  63.99  1,291,039.16 
6019+070.00  6.40  12.80  0.00  0.00  1,291,039.16 
6019+080.00  6.40  12.80  5.00  63.99  1,290,975.17 
6019+100.00  6.40  12.80  10.00  127.98  1,290,847.19 
6019+120.00  6.40  12.80  10.00  127.98  1,290,719.21 
6019+140.00  6.40  12.80  10.00  127.98  1,290,591.23 
6019+160.00  6.40  12.80  10.00  127.98  1,290,463.25 
6019+160.00  6.40  12.80  0.00  0.00  1,290,463.25 
6019+180.00  6.40  12.80  10.00  127.98  1,290,335.27 
6019+200.00  6.40  12.80  10.00  127.98  1,290,207.29 
6019+220.00  6.40  12.80  10.00  127.98  1,290,079.31 

519 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6019+240.00  6.40  12.80  10.00  127.98  1,289,951.33 


6019+247.00  6.40  12.80  3.50  44.79  1,289,906.54 
6019+257.00  6.40  12.80  5.00  63.99  1,289,842.55 
6019+260.00  6.39  12.79  1.50  19.18  1,289,823.37 
6019+267.00  6.36  12.75  3.50  44.62  1,289,778.75 
6019+277.00  6.24  12.60  5.00  63.02  1,289,715.73 
6019+280.00  6.19  12.43  1.50  18.64  1,289,697.09 
6019+287.00  6.05  12.23  3.50  42.82  1,289,654.27 
6019+297.00  5.79  11.84  5.00  59.18  1,289,595.09 
6019+300.00  5.71  11.49  1.50  17.24  1,289,577.85 
6019+307.00  5.52  11.22  3.50  39.28  1,289,538.57 
6019+317.00  5.25  10.76  5.00  53.81  1,289,484.77 
6019+320.00  5.16  10.41  1.50  15.61  1,289,469.16 
6019+327.00  4.97  10.14  3.50  35.48  1,289,433.67 
6019+337.00  4.71  9.69  5.00  48.44  1,289,385.24 
6019+340.00  4.66  9.37  1.50  14.05  1,289,371.18 
6019+347.00  4.52  9.18  3.50  32.12  1,289,339.06 
6019+357.00  4.41  8.93  5.00  44.64  1,289,294.43 
6019+360.00  4.40  8.80  1.50  13.20  1,289,281.23 
6019+366.83  4.37  8.76  3.42  29.94  1,289,251.29 
6019+380.00  4.23  8.59  6.58  56.58  1,289,194.71 
6019+386.83  4.16  8.39  3.42  28.65  1,289,166.06 
6019+400.00  4.16  8.32  6.58  54.79  1,289,111.27 
6019+420.00  4.16  8.32  10.00  83.22  1,289,028.05 
6019+440.00  4.16  8.32  10.00  83.22  1,288,944.83 
6019+460.00  4.16  8.32  10.00  83.22  1,288,861.61 
6019+480.00  4.16  8.32  10.00  83.22  1,288,778.39 
6019+500.00  4.16  8.32  10.00  83.22  1,288,695.17 
6019+520.00  4.16  8.32  10.00  83.22  1,288,611.95 
6019+540.00  4.16  8.32  10.00  83.22  1,288,528.73 
6019+560.00  4.16  8.32  10.00  83.22  1,288,445.51 
6019+570.00  4.16  8.32  5.00  41.61  1,288,403.90 
6019+580.00  4.25  8.42  5.00  42.08  1,288,361.82 
6019+590.00  4.37  8.62  5.00  43.12  1,288,318.71 
6019+600.00  4.39  8.76  5.00  43.78  1,288,274.93 
6019+610.00  4.44  8.82  5.00  44.11  1,288,230.82 
6019+620.00  4.52  8.96  5.00  44.79  1,288,186.04 
6019+630.00  4.64  9.16  5.00  45.80  1,288,140.24 
6019+640.00  4.79  9.43  5.00  47.16  1,288,093.08 
6019+650.00  4.98  9.77  5.00  48.85  1,288,044.23 
6019+660.00  5.18  10.16  5.00  50.80  1,287,993.43 
6019+670.00  5.38  10.57  5.00  52.83  1,287,940.60 
6019+680.00  5.59  10.97  5.00  54.86  1,287,885.75 
6019+690.00  5.79  11.38  5.00  56.89  1,287,828.86 
6019+700.00  5.98  11.77  5.00  58.84  1,287,770.03 

520 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6019+710.00  6.13  12.11  5.00  60.53  1,287,709.50 


6019+720.00  6.25  12.38  5.00  61.88  1,287,647.62 
6019+730.00  6.33  12.58  5.00  62.90  1,287,584.72 
6019+740.00  6.38  12.72  5.00  63.58  1,287,521.15 
6019+750.00  6.40  12.78  5.00  63.91  1,287,457.24 
6019+760.00  6.40  12.80  5.00  63.99  1,287,393.25 
6019+770.00  6.40  12.80  5.00  63.99  1,287,329.26 
6019+780.00  6.40  12.80  5.00  63.99  1,287,265.27 
6019+800.00  6.40  12.80  10.00  127.98  1,287,137.29 
6019+820.00  6.40  12.80  10.00  127.98  1,287,009.31 
6019+840.00  6.40  12.80  10.00  127.98  1,286,881.33 
6019+860.00  6.40  12.80  10.00  127.98  1,286,753.35 
6019+880.00  6.40  12.80  10.00  127.98  1,286,625.37 
6019+900.00  6.40  12.80  10.00  127.98  1,286,497.39 
6019+920.00  6.40  12.80  10.00  127.98  1,286,369.41 
6019+940.00  6.40  12.80  10.00  127.98  1,286,241.43 
6019+960.00  6.40  12.80  10.00  127.98  1,286,113.45 
6019+980.00  6.40  12.80  10.00  127.98  1,285,985.47 
6020+000.00  6.40  12.80  10.00  127.98  1,285,857.49 
6020+020.00  6.40  12.80  10.00  127.98  1,285,729.51 
6020+040.00  6.40  12.80  10.00  127.98  1,285,601.53 
6020+060.00  6.40  12.80  10.00  127.98  1,285,473.55 
6020+080.00  6.40  12.80  10.00  127.98  1,285,345.57 
6020+100.00  6.40  12.80  10.00  127.98  1,285,217.59 
6020+120.00  6.40  12.80  10.00  127.98  1,285,089.61 
6020+140.00  6.40  12.80  10.00  127.98  1,284,961.63 
6020+160.00  6.40  12.80  10.00  127.98  1,284,833.65 
6020+180.00  6.40  12.80  10.00  127.98  1,284,705.67 
6020+200.00  6.40  12.80  10.00  127.98  1,284,577.69 
6020+220.00  6.40  12.80  10.00  127.98  1,284,449.71 
6020+240.00  6.40  12.80  10.00  127.98  1,284,321.73 
6020+260.00  6.40  12.80  10.00  127.98  1,284,193.75 
6020+280.00  6.40  12.80  10.00  127.98  1,284,065.77 
6020+300.00  6.40  12.80  10.00  127.98  1,283,937.79 
6020+320.00  6.40  12.80  10.00  127.98  1,283,809.81 
6020+340.00  6.40  12.80  10.00  127.98  1,283,681.83 
6020+360.00  6.40  12.80  10.00  127.98  1,283,553.85 
6020+380.00  6.40  12.80  10.00  127.98  1,283,425.87 
6020+400.00  6.40  12.80  10.00  127.98  1,283,297.89 
6020+420.00  6.40  12.80  10.00  127.98  1,283,169.91 
6020+440.00  6.40  12.80  10.00  127.98  1,283,041.93 
6020+460.00  6.40  12.80  10.00  127.98  1,282,913.95 
6020+480.00  6.40  12.80  10.00  127.99  1,282,785.96 
6020+500.00  6.40  12.80  10.00  127.99  1,282,657.97 
6020+520.00  6.40  12.80  10.00  127.99  1,282,529.98 

521 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6020+540.00  6.40  12.80  10.00  128.00  1,282,401.98 


6020+560.00  6.40  12.80  10.00  127.99  1,282,273.99 
6020+580.00  6.40  12.80  10.00  127.98  1,282,146.01 
6020+600.00  6.40  12.80  10.00  127.99  1,282,018.02 
6020+620.00  6.40  12.80  10.00  128.00  1,281,890.02 
6020+640.00  6.40  12.80  10.00  128.00  1,281,762.02 
6020+660.00  6.40  12.80  10.00  127.99  1,281,634.03 
6020+680.00  6.40  12.80  10.00  127.99  1,281,506.04 
6020+700.00  6.40  12.80  10.00  128.00  1,281,378.04 
6020+720.00  6.40  12.80  10.00  127.99  1,281,250.05 
6020+740.00  6.40  12.80  10.00  127.99  1,281,122.06 
6020+760.00  6.40  12.80  10.00  128.00  1,280,994.06 
6020+780.00  6.40  12.80  10.00  127.99  1,280,866.07 
6020+800.00  6.40  12.80  10.00  127.99  1,280,738.08 
6020+820.00  6.40  12.80  10.00  128.00  1,280,610.08 
6020+840.00  6.40  12.80  10.00  128.00  1,280,482.08 
6020+860.00  6.40  12.80  10.00  127.99  1,280,354.09 
6020+880.00  6.40  12.80  10.00  127.99  1,280,226.10 
6020+880.00  6.40  12.80  0.00  0.00  1,280,226.10 
6020+900.00  6.40  12.80  10.00  128.00  1,280,098.10 
6020+920.00  6.40  12.80  10.00  127.99  1,279,970.11 
6020+940.00  6.40  12.80  10.00  127.99  1,279,842.12 
6020+960.00  6.40  12.80  10.00  128.00  1,279,714.12 
6020+980.00  6.40  12.80  10.00  128.00  1,279,586.12 
6021+000.00  6.40  12.80  10.00  127.99  1,279,458.13 
6021+020.00  6.40  12.80  10.00  127.99  1,279,330.14 
6021+040.00  6.40  12.80  10.00  128.00  1,279,202.14 
6021+060.00  6.40  12.80  10.00  127.99  1,279,074.15 
6021+080.00  6.40  12.80  10.00  127.99  1,278,946.16 
6021+100.00  6.40  12.80  10.00  128.00  1,278,818.16 
6021+120.00  6.40  12.80  10.00  127.99  1,278,690.17 
6021+140.00  6.40  12.80  10.00  127.98  1,278,562.19 
6021+160.00  6.40  12.80  10.00  127.98  1,278,434.21 
6021+180.00  6.40  12.80  10.00  127.99  1,278,306.22 
6021+200.00  6.40  12.80  10.00  128.00  1,278,178.22 
6021+220.00  6.40  12.80  10.00  127.99  1,278,050.23 
6021+240.00  6.40  12.80  10.00  127.99  1,277,922.24 
6021+250.00  6.40  12.80  5.00  64.00  1,277,858.24 
6021+260.00  6.38  12.78  5.00  63.92  1,277,794.32 
6021+270.00  6.33  12.72  5.00  63.58  1,277,730.75 
6021+280.00  6.25  12.58  5.00  62.90  1,277,667.85 
6021+290.00  6.13  12.38  5.00  61.88  1,277,605.97 
6021+300.00  5.98  12.11  5.00  60.53  1,277,545.45 
6021+310.00  5.79  11.77  5.00  58.83  1,277,486.62 
6021+320.00  5.59  11.38  5.00  56.89  1,277,429.73 

522 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6021+330.00  5.38  10.97  5.00  54.86  1,277,374.88 


6021+340.00  5.18  10.57  5.00  52.83  1,277,322.05 
6021+350.00  4.98  10.16  5.00  50.80  1,277,271.26 
6021+360.00  4.79  9.77  5.00  48.85  1,277,222.41 
6021+370.00  4.64  9.43  5.00  47.16  1,277,175.25 
6021+380.00  4.52  9.16  5.00  45.80  1,277,129.46 
6021+390.00  4.44  8.96  5.00  44.78  1,277,084.68 
6021+400.00  4.39  8.82  5.00  44.11  1,277,040.57 
6021+409.97  4.37  8.76  4.99  43.65  1,276,996.92 
6021+420.00  4.25  8.62  5.01  43.24  1,276,953.68 
6021+429.97  4.16  8.42  4.99  41.95  1,276,911.73 
6021+440.00  4.16  8.32  5.01  41.73  1,276,870.00 
6021+455.00  4.16  8.32  7.50  62.42  1,276,807.58 
6021+455.00  4.16  8.32  0.00  0.00  1,276,807.58 
6021+460.00  4.16  8.32  2.50  20.81  1,276,786.78 
6021+480.00  4.16  8.32  10.00  83.22  1,276,703.56 
6021+500.00  4.16  8.32  10.00  83.22  1,276,620.34 
6021+520.00  4.16  8.32  10.00  83.22  1,276,537.12 
6021+540.00  4.16  8.32  10.00  83.22  1,276,453.90 
6021+560.00  4.16  8.32  10.00  83.22  1,276,370.68 
6021+580.00  4.16  8.32  10.00  83.22  1,276,287.46 
6021+600.00  4.16  8.32  10.00  83.22  1,276,204.24 
6021+620.00  4.16  8.32  10.00  83.22  1,276,121.02 
6021+640.00  4.16  8.32  10.00  83.22  1,276,037.80 
6021+660.00  4.16  8.32  10.00  83.22  1,275,954.58 
6021+680.00  4.16  8.32  10.00  83.22  1,275,871.36 
6021+700.00  4.16  8.32  10.00  83.22  1,275,788.14 
6021+702.74  4.16  8.32  1.37  11.41  1,275,776.73 
6021+720.00  4.16  8.32  8.63  71.81  1,275,704.92 
6021+740.00  4.16  8.32  10.00  83.22  1,275,621.70 
6021+760.00  4.16  8.32  10.00  83.22  1,275,538.48 
6021+775.00  4.16  8.32  7.50  62.42  1,275,476.06 
6021+775.00  4.16  8.32  0.00  0.00  1,275,476.06 
6021+780.00  4.16  8.32  2.50  20.81  1,275,455.26 
6021+800.00  4.16  8.32  10.00  83.22  1,275,372.04 
6021+820.00  4.16  8.32  10.00  83.22  1,275,288.82 
6021+840.00  4.16  8.32  10.00  83.22  1,275,205.60 
6021+852.74  4.16  8.32  6.37  53.02  1,275,152.58 
6021+860.00  4.16  8.32  3.63  30.20  1,275,122.38 
6021+880.00  4.16  8.32  10.00  83.22  1,275,039.16 
6021+900.00  4.16  8.32  10.00  83.22  1,274,955.94 
6021+920.00  4.16  8.32  10.00  83.22  1,274,872.72 
6021+940.00  4.16  8.32  10.00  83.22  1,274,789.50 
6021+960.00  4.16  8.32  10.00  83.22  1,274,706.28 
6021+980.00  4.16  8.32  10.00  83.22  1,274,623.06 

523 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6022+000.00  4.16  8.32  10.00  83.22  1,274,539.84 


6022+020.00  4.16  8.32  10.00  83.22  1,274,456.62 
6022+040.00  4.16  8.32  10.00  83.22  1,274,373.40 
6022+060.00  4.16  8.32  10.00  83.22  1,274,290.18 
6022+080.00  4.16  8.32  10.00  83.22  1,274,206.96 
6022+095.00  4.16  8.32  7.50  62.42  1,274,144.54 
6022+095.00  4.16  8.32  0.00  0.00  1,274,144.54 
6022+100.00  4.16  8.32  2.50  20.81  1,274,123.74 
6022+100.00  4.16  8.32  0.00  0.00  1,274,123.73 
6022+120.00  4.16  8.32  10.00  83.22  1,274,040.52 
6022+140.00  4.16  8.32  10.00  83.22  1,273,957.30 
6022+160.00  4.16  8.32  10.00  83.22  1,273,874.08 
6022+170.00  4.16  8.32  5.00  41.61  1,273,832.47 
6022+170.00  4.16  8.32  0.00  0.00  1,273,832.47 
6022+180.00  4.16  8.32  5.00  41.61  1,273,790.86 
6022+200.00  4.16  8.32  10.00  83.22  1,273,707.64 
6022+220.00  4.16  8.32  10.00  83.22  1,273,624.42 
6022+240.00  4.16  8.32  10.00  83.22  1,273,541.20 
6022+260.00  4.16  8.32  10.00  83.22  1,273,457.98 
6022+280.00  4.16  8.32  10.00  83.22  1,273,374.76 
6022+300.00  4.16  8.32  10.00  83.22  1,273,291.54 
6022+320.00  4.16  8.32  10.00  83.22  1,273,208.32 
6022+340.00  4.16  8.32  10.00  83.22  1,273,125.10 
6022+360.00  4.16  8.32  10.00  83.22  1,273,041.88 
6022+380.00  4.16  8.32  10.00  83.22  1,272,958.66 
6022+400.00  4.16  8.32  10.00  83.22  1,272,875.44 
6022+420.00  4.16  8.32  10.00  83.22  1,272,792.22 
6022+440.00  4.16  8.32  10.00  83.22  1,272,709.00 
6022+460.00  4.16  8.32  10.00  83.22  1,272,625.78 
6022+480.00  4.16  8.32  10.00  83.22  1,272,542.56 
6022+500.00  4.16  8.32  10.00  83.22  1,272,459.34 
6022+520.00  4.16  8.32  10.00  83.22  1,272,376.12 
6022+540.00  4.16  8.32  10.00  83.22  1,272,292.90 
6022+560.00  4.16  8.32  10.00  83.22  1,272,209.68 
6022+580.00  4.16  8.32  10.00  83.22  1,272,126.46 
6022+600.00  4.16  8.32  10.00  83.22  1,272,043.24 
6022+620.00  4.16  8.32  10.00  83.22  1,271,960.02 
6022+640.00  4.16  8.32  10.00  83.22  1,271,876.80 
6022+660.00  4.16  8.32  10.00  83.22  1,271,793.58 
6022+680.00  4.16  8.32  10.00  83.22  1,271,710.36 
6022+700.00  4.16  8.32  10.00  83.22  1,271,627.14 
6022+720.00  4.16  8.32  10.00  83.22  1,271,543.92 
6022+740.00  4.16  8.32  10.00  83.22  1,271,460.70 
6022+760.00  4.16  8.32  10.00  83.22  1,271,377.48 
6022+780.00  4.16  8.32  10.00  83.22  1,271,294.26 

524 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6022+800.00  4.16  8.32  10.00  83.22  1,271,211.04 


6022+820.00  4.16  8.32  10.00  83.22  1,271,127.82 
6022+840.00  4.16  8.32  10.00  83.22  1,271,044.60 
6022+860.00  4.16  8.32  10.00  83.22  1,270,961.38 
6022+880.00  4.16  8.32  10.00  83.22  1,270,878.16 
6022+900.00  4.16  8.32  10.00  83.22  1,270,794.94 
6022+920.00  4.16  8.32  10.00  83.22  1,270,711.72 
6022+940.00  4.16  8.32  10.00  83.22  1,270,628.50 
6022+960.00  4.16  8.32  10.00  83.22  1,270,545.28 
6022+980.00  4.16  8.32  10.00  83.22  1,270,462.06 
6023+000.00  4.16  8.32  10.00  83.22  1,270,378.84 
6023+020.00  4.16  8.32  10.00  83.22  1,270,295.62 
6023+040.00  4.16  8.32  10.00  83.22  1,270,212.40 
6023+060.00  4.16  8.32  10.00  83.22  1,270,129.18 
6023+080.00  4.16  8.32  10.00  83.22  1,270,045.96 
6023+100.00  4.16  8.32  10.00  83.22  1,269,962.74 
6023+120.00  4.16  8.32  10.00  83.22  1,269,879.52 
6023+140.00  4.16  8.32  10.00  83.22  1,269,796.30 
6023+160.00  4.16  8.32  10.00  83.22  1,269,713.08 
6023+180.00  4.16  8.32  10.00  83.22  1,269,629.86 
6023+200.00  4.16  8.32  10.00  83.22  1,269,546.64 
6023+220.00  4.16  8.32  10.00  83.22  1,269,463.42 
6023+240.00  4.16  8.32  10.00  83.22  1,269,380.20 
6023+260.00  4.16  8.32  10.00  83.22  1,269,296.98 
6023+280.00  4.16  8.32  10.00  83.22  1,269,213.76 
6023+300.00  4.16  8.32  10.00  83.22  1,269,130.54 
6023+320.00  4.16  8.32  10.00  83.22  1,269,047.32 
6023+340.00  4.16  8.32  10.00  83.22  1,268,964.10 
6023+360.00  4.16  8.32  10.00  83.22  1,268,880.88 
6023+380.00  4.16  8.32  10.00  83.22  1,268,797.66 
6023+400.00  4.16  8.32  10.00  83.22  1,268,714.44 
6023+420.00  4.16  8.32  10.00  83.22  1,268,631.22 
6023+440.00  4.16  8.32  10.00  83.22  1,268,548.00 
6023+460.00  4.16  8.32  10.00  83.22  1,268,464.78 
6023+480.00  4.16  8.32  10.00  83.22  1,268,381.56 
6023+500.00  4.16  8.32  10.00  83.22  1,268,298.34 
6023+520.00  4.16  8.32  10.00  83.22  1,268,215.12 
6023+540.00  4.16  8.32  10.00  83.22  1,268,131.90 
6023+560.00  4.16  8.32  10.00  83.22  1,268,048.68 
6023+580.00  4.16  8.32  10.00  83.22  1,267,965.46 
6023+600.00  4.16  8.32  10.00  83.22  1,267,882.24 
6023+620.00  4.16  8.32  10.00  83.22  1,267,799.02 
6023+640.00  4.16  8.32  10.00  83.22  1,267,715.80 
6023+660.00  4.16  8.32  10.00  83.22  1,267,632.58 
6023+680.00  4.16  8.32  10.00  83.22  1,267,549.36 

525 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6023+700.00  4.16  8.32  10.00  83.22  1,267,466.14 


6023+720.00  4.16  8.32  10.00  83.22  1,267,382.92 
6023+740.00  4.16  8.32  10.00  83.22  1,267,299.70 
6023+760.00  4.16  8.32  10.00  83.22  1,267,216.48 
6023+780.00  4.16  8.32  10.00  83.22  1,267,133.26 
6023+800.00  4.16  8.32  10.00  83.22  1,267,050.04 
6023+820.00  4.16  8.32  10.00  83.22  1,266,966.82 
6023+840.00  4.16  8.32  10.00  83.22  1,266,883.60 
6023+860.00  4.16  8.32  10.00  83.22  1,266,800.38 
6023+880.00  4.16  8.32  10.00  83.22  1,266,717.16 
6023+880.00  4.32  8.48  0.00  0.00  1,266,717.15 
6023+900.00  4.32  8.64  10.00  86.42  1,266,630.74 
6023+920.00  4.32  8.64  10.00  86.42  1,266,544.32 
6023+940.00  4.32  8.64  10.00  86.42  1,266,457.90 
6023+960.00  4.32  8.64  10.00  86.42  1,266,371.48 
6023+980.00  4.32  8.64  10.00  86.42  1,266,285.06 
6024+000.00  4.32  8.64  10.00  86.42  1,266,198.64 
6024+020.00  4.32  8.64  10.00  86.42  1,266,112.22 
6024+040.00  4.32  8.64  10.00  86.42  1,266,025.80 
6024+049.07  4.32  8.64  4.54  39.20  1,265,986.60 
6024+060.00  4.32  8.64  5.46  47.22  1,265,939.38 
6024+080.00  4.32  8.64  10.00  86.42  1,265,852.96 
6024+100.00  4.32  8.64  10.00  86.42  1,265,766.54 
6024+120.00  4.32  8.64  10.00  86.42  1,265,680.12 
6024+140.00  4.32  8.64  10.00  86.42  1,265,593.70 
6024+160.00  4.32  8.64  10.00  86.42  1,265,507.28 
6024+180.00  4.32  8.64  10.00  86.42  1,265,420.86 
6024+199.07  4.32  8.64  9.54  82.41  1,265,338.45 
6024+200.00  4.32  8.64  0.46  4.01  1,265,334.44 
6024+220.00  4.32  8.64  10.00  86.42  1,265,248.02 
6024+240.00  4.32  8.64  10.00  86.42  1,265,161.60 
6024+260.00  4.32  8.64  10.00  86.42  1,265,075.18 
6024+270.00  4.32  8.64  5.00  43.21  1,265,031.97 
6024+270.00  4.32  8.64  0.00  0.00  1,265,031.97 
6024+280.00  4.32  8.64  5.00  43.21  1,264,988.76 
6024+300.00  4.32  8.64  10.00  86.42  1,264,902.34 
6024+316.48  4.32  8.64  8.24  71.23  1,264,831.11 
6024+320.00  4.32  8.64  1.76  15.19  1,264,815.92 
6024+340.00  4.32  8.64  10.00  86.42  1,264,729.50 
6024+360.00  4.32  8.64  10.00  86.42  1,264,643.08 
6024+376.40  4.32  8.64  8.20  70.87  1,264,572.21 
6024+376.40     0.00        1,300,000.00 
6024+380.00     0.00  1.80  0.00  1,300,000.00 
6024+400.00     0.00  10.00  0.00  1,300,000.00 
6024+420.00     0.00  10.00  0.00  1,300,000.00 

526 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6024+440.00     0.00  10.00  0.00  1,300,000.00 


6024+460.00     0.00  10.00  0.00  1,300,000.00 
6024+480.00     0.00  10.00  0.00  1,300,000.00 
6024+500.00     0.00  10.00  0.00  1,300,000.00 
6024+520.00     0.00  10.00  0.00  1,300,000.00 
6024+540.00     0.00  10.00  0.00  1,300,000.00 
6024+560.00     0.00  10.00  0.00  1,300,000.00 
6024+580.00     0.00  10.00  0.00  1,300,000.00 
6024+600.00     0.00  10.00  0.00  1,300,000.00 
6024+620.00     0.00  10.00  0.00  1,300,000.00 
6024+640.00     0.00  10.00  0.00  1,300,000.00 
6024+660.00     0.00  10.00  0.00  1,300,000.00 
6024+680.00     0.00  10.00  0.00  1,300,000.00 
6024+700.00     0.00  10.00  0.00  1,300,000.00 
6024+720.00     0.00  10.00  0.00  1,300,000.00 
6024+740.00     0.00  10.00  0.00  1,300,000.00 
6024+760.00     0.00  10.00  0.00  1,300,000.00 
6024+780.00     0.00  10.00  0.00  1,300,000.00 
6024+800.00     0.00  10.00  0.00  1,300,000.00 
6024+820.00     0.00  10.00  0.00  1,300,000.00 
6024+840.00     0.00  10.00  0.00  1,300,000.00 
6024+860.00     0.00  10.00  0.00  1,300,000.00 
6024+880.00     0.00  10.00  0.00  1,300,000.00 
6024+900.00     0.00  10.00  0.00  1,300,000.00 
6024+920.00     0.00  10.00  0.00  1,300,000.00 
6024+940.00     0.00  10.00  0.00  1,300,000.00 
6024+960.00     0.00  10.00  0.00  1,300,000.00 
6024+980.00     0.00  10.00  0.00  1,300,000.00 
6025+000.00     0.00  10.00  0.00  1,300,000.00 
6025+020.00     0.00  10.00  0.00  1,300,000.00 
6025+040.00     0.00  10.00  0.00  1,300,000.00 
6025+060.00     0.00  10.00  0.00  1,300,000.00 
6025+080.00     0.00  10.00  0.00  1,300,000.00 
6025+100.00     0.00  10.00  0.00  1,300,000.00 
6025+120.00     0.00  10.00  0.00  1,300,000.00 
6025+140.00     0.00  10.00  0.00  1,300,000.00 
6025+160.00     0.00  10.00  0.00  1,300,000.00 
6025+180.00     0.00  10.00  0.00  1,300,000.00 
6025+200.00     0.00  10.00  0.00  1,300,000.00 
6025+220.00     0.00  10.00  0.00  1,300,000.00 
6025+240.00     0.00  10.00  0.00  1,300,000.00 
6025+260.00     0.00  10.00  0.00  1,300,000.00 
6025+280.00     0.00  10.00  0.00  1,300,000.00 
6025+300.00     0.00  10.00  0.00  1,300,000.00 
6025+320.00     0.00  10.00  0.00  1,300,000.00 

527 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6025+340.00     0.00  10.00  0.00  1,300,000.00 


6025+360.00     0.00  10.00  0.00  1,300,000.00 
6025+380.00     0.00  10.00  0.00  1,300,000.00 
6025+400.00     0.00  10.00  0.00  1,300,000.00 
6025+420.00     0.00  10.00  0.00  1,300,000.00 
6025+440.00     0.00  10.00  0.00  1,300,000.00 
6025+460.00     0.00  10.00  0.00  1,300,000.00 
6025+480.00     0.00  10.00  0.00  1,300,000.00 
6025+500.00     0.00  10.00  0.00  1,300,000.00 
6025+520.00     0.00  10.00  0.00  1,300,000.00 
6025+540.00     0.00  10.00  0.00  1,300,000.00 
6025+560.00     0.00  10.00  0.00  1,300,000.00 
6025+580.00     0.00  10.00  0.00  1,300,000.00 
6025+580.00     0.00  0.00  0.00  1,300,000.00 
6025+600.00     0.00  10.00  0.00  1,300,000.00 
6025+620.00     0.00  10.00  0.00  1,300,000.00 
6025+640.00     0.00  10.00  0.00  1,300,000.00 
6025+660.00     0.00  10.00  0.00  1,300,000.00 
6025+660.00     0.00  0.00  0.00  1,300,000.00 
6025+680.00     0.00  10.00  0.00  1,300,000.00 
6025+700.00     0.00  10.00  0.00  1,300,000.00 
6025+720.00     0.00  10.00  0.00  1,300,000.00 
6025+740.00     0.00  10.00  0.00  1,300,000.00 
6025+760.00     0.00  10.00  0.00  1,300,000.00 
6025+780.00     0.00  10.00  0.00  1,300,000.00 
6025+800.00     0.00  10.00  0.00  1,300,000.00 
6025+820.00     0.00  10.00  0.00  1,300,000.00 
6025+840.00     0.00  10.00  0.00  1,300,000.00 
6025+860.00     0.00  10.00  0.00  1,300,000.00 
6025+880.00     0.00  10.00  0.00  1,300,000.00 
6025+900.00     0.00  10.00  0.00  1,300,000.00 
6025+920.00     0.00  10.00  0.00  1,300,000.00 
6025+940.00     0.00  10.00  0.00  1,300,000.00 
6025+960.00     0.00  10.00  0.00  1,300,000.00 
6025+980.00     0.00  10.00  0.00  1,300,000.00 
6026+000.00     0.00  10.00  0.00  1,300,000.00 
6026+020.00     0.00  10.00  0.00  1,300,000.00 
6026+040.00     0.00  10.00  0.00  1,300,000.00 
6026+060.00     0.00  10.00  0.00  1,300,000.00 
6026+080.00     0.00  10.00  0.00  1,300,000.00 
6026+100.00     0.00  10.00  0.00  1,300,000.00 
6026+120.00     0.00  10.00  0.00  1,300,000.00 
6026+140.00     0.00  10.00  0.00  1,300,000.00 
6026+160.00     0.00  10.00  0.00  1,300,000.00 
6026+180.00     0.00  10.00  0.00  1,300,000.00 

528 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6026+200.00     0.00  10.00  0.00  1,300,000.00 


6026+220.00     0.00  10.00  0.00  1,300,000.00 
6026+240.00     0.00  10.00  0.00  1,300,000.00 
6026+260.00     0.00  10.00  0.00  1,300,000.00 
6026+280.00     0.00  10.00  0.00  1,300,000.00 
6026+290.99     0.00  5.49  0.00  1,300,000.00 
6026+300.00     0.00  4.51  0.00  1,300,000.00 
6026+320.00     0.00  10.00  0.00  1,300,000.00 
6026+320.99     0.00  0.49  0.00  1,300,000.00 
6026+340.00     0.00  9.51  0.00  1,300,000.00 
6026+360.00     0.00  10.00  0.00  1,300,000.00 
6026+380.00     0.00  10.00  0.00  1,300,000.00 
6026+400.00     0.00  10.00  0.00  1,300,000.00 
6026+407.71     0.00  3.85  0.00  1,300,000.00 
6026+420.00     0.00  6.15  0.00  1,300,000.00 
6026+437.71     0.00  8.85  0.00  1,300,000.00 
6026+440.00     0.00  1.15  0.00  1,300,000.00 
6026+460.00     0.00  10.00  0.00  1,300,000.00 
6026+480.00     0.00  10.00  0.00  1,300,000.00 
6026+500.00     0.00  10.00  0.00  1,300,000.00 
6026+520.00     0.00  10.00  0.00  1,300,000.00 
6026+540.00     0.00  10.00  0.00  1,300,000.00 
6026+560.00     0.00  10.00  0.00  1,300,000.00 
6026+580.00     0.00  10.00  0.00  1,300,000.00 
6026+600.00     0.00  10.00  0.00  1,300,000.00 
6026+620.00     0.00  10.00  0.00  1,300,000.00 
6026+640.00     0.00  10.00  0.00  1,300,000.00 
6026+660.00     0.00  10.00  0.00  1,300,000.00 
6026+680.00     0.00  10.00  0.00  1,300,000.00 
6026+700.00     0.00  10.00  0.00  1,300,000.00 
6026+720.00     0.00  10.00  0.00  1,300,000.00 
6026+740.00     0.00  10.00  0.00  1,300,000.00 
6026+760.00     0.00  10.00  0.00  1,300,000.00 
6026+780.00     0.00  10.00  0.00  1,300,000.00 
6026+800.00     0.00  10.00  0.00  1,300,000.00 
6026+820.00     0.00  10.00  0.00  1,300,000.00 
6026+840.00     0.00  10.00  0.00  1,300,000.00 
6026+860.00     0.00  10.00  0.00  1,300,000.00 
6026+880.00     0.00  10.00  0.00  1,300,000.00 
6026+900.00     0.00  10.00  0.00  1,300,000.00 
6026+920.00     0.00  10.00  0.00  1,300,000.00 
6026+940.00     0.00  10.00  0.00  1,300,000.00 
6026+960.00     0.00  10.00  0.00  1,300,000.00 
6026+980.00     0.00  10.00  0.00  1,300,000.00 
6027+000.00     0.00  10.00  0.00  1,300,000.00 

529 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6027+020.00     0.00  10.00  0.00  1,300,000.00 


6027+040.00     0.00  10.00  0.00  1,300,000.00 
6027+060.00     0.00  10.00  0.00  1,300,000.00 
6027+080.00     0.00  10.00  0.00  1,300,000.00 
6027+100.00     0.00  10.00  0.00  1,300,000.00 
6027+120.00     0.00  10.00  0.00  1,300,000.00 
6027+140.00     0.00  10.00  0.00  1,300,000.00 
6027+160.00     0.00  10.00  0.00  1,300,000.00 
6027+180.00     0.00  10.00  0.00  1,300,000.00 
6027+200.00     0.00  10.00  0.00  1,300,000.00 
6027+220.00     0.00  10.00  0.00  1,300,000.00 
6027+240.00     0.00  10.00  0.00  1,300,000.00 
6027+260.00     0.00  10.00  0.00  1,300,000.00 
6027+280.00     0.00  10.00  0.00  1,300,000.00 
6027+300.00     0.00  10.00  0.00  1,300,000.00 
6027+320.00     0.00  10.00  0.00  1,300,000.00 
6027+340.00     0.00  10.00  0.00  1,300,000.00 
6027+360.00     0.00  10.00  0.00  1,300,000.00 
6027+380.00     0.00  10.00  0.00  1,300,000.00 
6027+400.00     0.00  10.00  0.00  1,300,000.00 
6027+420.00     0.00  10.00  0.00  1,300,000.00 
6027+440.00     0.00  10.00  0.00  1,300,000.00 
6027+460.00     0.00  10.00  0.00  1,300,000.00 
6027+480.00     0.00  10.00  0.00  1,300,000.00 
6027+500.00     0.00  10.00  0.00  1,300,000.00 
6027+520.00     0.00  10.00  0.00  1,300,000.00 
6027+540.00     0.00  10.00  0.00  1,300,000.00 
6027+560.00     0.00  10.00  0.00  1,300,000.00 
6027+565.00     0.00  2.50  0.00  1,300,000.00 
6027+565.00     0.00  0.00  0.00  1,300,000.00 
6027+580.00     0.00  7.50  0.00  1,300,000.00 
6027+600.00     0.00  10.00  0.00  1,300,000.00 
6027+620.00     0.00  10.00  0.00  1,300,000.00 
6027+640.00     0.00  10.00  0.00  1,300,000.00 
6027+660.00     0.00  10.00  0.00  1,300,000.00 
6027+680.00     0.00  10.00  0.00  1,300,000.00 
6027+700.00     0.00  10.00  0.00  1,300,000.00 
6027+720.00     0.00  10.00  0.00  1,300,000.00 
6027+740.00     0.00  10.00  0.00  1,300,000.00 
6027+760.00     0.00  10.00  0.00  1,300,000.00 
6027+780.00     0.00  10.00  0.00  1,300,000.00 
6027+800.00     0.00  10.00  0.00  1,300,000.00 
6027+820.00     0.00  10.00  0.00  1,300,000.00 
6027+840.00     0.00  10.00  0.00  1,300,000.00 
6027+860.00     0.00  10.00  0.00  1,300,000.00 

530 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6027+880.00     0.00  10.00  0.00  1,300,000.00 


6027+900.00     0.00  10.00  0.00  1,300,000.00 
6027+920.00     0.00  10.00  0.00  1,300,000.00 
6027+940.00     0.00  10.00  0.00  1,300,000.00 
6027+960.00     0.00  10.00  0.00  1,300,000.00 
6027+980.00     0.00  10.00  0.00  1,300,000.00 
6027+990.00     0.00  5.00  0.00  1,300,000.00 
6027+990.00     0.00  0.00  0.00  1,300,000.00 
6028+000.00     0.00  5.00  0.00  1,300,000.00 
6028+000.00     0.00  0.00  0.00  1,300,000.00 
6028+020.00     0.00  10.00  0.00  1,300,000.00 
6028+040.00     0.00  10.00  0.00  1,300,000.00 
6028+060.00     0.00  10.00  0.00  1,300,000.00 
6028+080.00     0.00  10.00  0.00  1,300,000.00 
6028+100.00     0.00  10.00  0.00  1,300,000.00 
6028+120.00     0.00  10.00  0.00  1,300,000.00 
6028+140.00     0.00  10.00  0.00  1,300,000.00 
6028+140.00     0.00  0.00  0.00  1,300,000.00 
6028+160.00     0.00  10.00  0.00  1,300,000.00 
6028+180.00     0.00  10.00  0.00  1,300,000.00 
6028+200.00     0.00  10.00  0.00  1,300,000.00 
6028+220.00     0.00  10.00  0.00  1,300,000.00 
6028+240.00     0.00  10.00  0.00  1,300,000.00 
6028+260.00     0.00  10.00  0.00  1,300,000.00 
6028+280.00     0.00  10.00  0.00  1,300,000.00 
6028+300.00     0.00  10.00  0.00  1,300,000.00 
6028+320.00     0.00  10.00  0.00  1,300,000.00 
6028+340.00     0.00  10.00  0.00  1,300,000.00 
6028+360.00     0.00  10.00  0.00  1,300,000.00 
6028+380.00     0.00  10.00  0.00  1,300,000.00 
6028+400.00     0.00  10.00  0.00  1,300,000.00 
6028+420.00     0.00  10.00  0.00  1,300,000.00 
6028+440.00     0.00  10.00  0.00  1,300,000.00 
6028+460.00     0.00  10.00  0.00  1,300,000.00 
6028+480.00     0.00  10.00  0.00  1,300,000.00 
6028+500.00     0.00  10.00  0.00  1,300,000.00 
6028+520.00     0.00  10.00  0.00  1,300,000.00 
6028+540.00     0.00  10.00  0.00  1,300,000.00 
6028+560.00     0.00  10.00  0.00  1,300,000.00 
6028+580.00     0.00  10.00  0.00  1,300,000.00 
6028+600.00     0.00  10.00  0.00  1,300,000.00 
6028+620.00     0.00  10.00  0.00  1,300,000.00 
6028+640.00     0.00  10.00  0.00  1,300,000.00 
6028+660.00     0.00  10.00  0.00  1,300,000.00 
6028+680.00     0.00  10.00  0.00  1,300,000.00 

531 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6028+700.00     0.00  10.00  0.00  1,300,000.00 


6028+720.00     0.00  10.00  0.00  1,300,000.00 
6028+740.00     0.00  10.00  0.00  1,300,000.00 
6028+760.00     0.00  10.00  0.00  1,300,000.00 
6028+780.00     0.00  10.00  0.00  1,300,000.00 
6028+800.00     0.00  10.00  0.00  1,300,000.00 
6028+820.00     0.00  10.00  0.00  1,300,000.00 
6028+840.00     0.00  10.00  0.00  1,300,000.00 
6028+860.00     0.00  10.00  0.00  1,300,000.00 
6028+880.00     0.00  10.00  0.00  1,300,000.00 
6028+900.00     0.00  10.00  0.00  1,300,000.00 
6028+920.00     0.00  10.00  0.00  1,300,000.00 
6028+940.00     0.00  10.00  0.00  1,300,000.00 
6028+960.00     0.00  10.00  0.00  1,300,000.00 
6028+980.00     0.00  10.00  0.00  1,300,000.00 
6029+000.00     0.00  10.00  0.00  1,300,000.00 
6029+020.00     0.00  10.00  0.00  1,300,000.00 
6029+040.00     0.00  10.00  0.00  1,300,000.00 
6029+060.00     0.00  10.00  0.00  1,300,000.00 
6029+080.00     0.00  10.00  0.00  1,300,000.00 
6029+100.00     0.00  10.00  0.00  1,300,000.00 
6029+120.00     0.00  10.00  0.00  1,300,000.00 
6029+140.00     0.00  10.00  0.00  1,300,000.00 
6029+160.00     0.00  10.00  0.00  1,300,000.00 
6029+180.00     0.00  10.00  0.00  1,300,000.00 
6029+200.00     0.00  10.00  0.00  1,300,000.00 
6029+220.00     0.00  10.00  0.00  1,300,000.00 
6029+240.00     0.00  10.00  0.00  1,300,000.00 
6029+255.00     0.00  7.50  0.00  1,300,000.00 
6029+255.00     0.00  0.00  0.00  1,300,000.00 
6029+260.00     0.00  2.50  0.00  1,300,000.00 
6029+280.00     0.00  10.00  0.00  1,300,000.00 
6029+300.00     0.00  10.00  0.00  1,300,000.00 
6029+320.00     0.00  10.00  0.00  1,300,000.00 
6029+340.00     0.00  10.00  0.00  1,300,000.00 
6029+340.00     0.00  0.00  0.00  1,300,000.00 
6029+360.00     0.00  10.00  0.00  1,300,000.00 
6029+380.00     0.00  10.00  0.00  1,300,000.00 
6029+400.00     0.00  10.00  0.00  1,300,000.00 
6029+420.00     0.00  10.00  0.00  1,300,000.00 
6029+440.00     0.00  10.00  0.00  1,300,000.00 
6029+449.97     0.00  4.98  0.00  1,300,000.00 
6029+460.00     0.00  5.02  0.00  1,300,000.00 
6029+480.00     0.00  10.00  0.00  1,300,000.00 
6029+500.00     0.00  10.00  0.00  1,300,000.00 

532 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6029+520.00     0.00  10.00  0.00  1,300,000.00 


6029+540.00     0.00  10.00  0.00  1,300,000.00 
6029+560.00     0.00  10.00  0.00  1,300,000.00 
6029+580.00     0.00  10.00  0.00  1,300,000.00 
6029+599.97     0.00  9.98  0.00  1,300,000.00 
6029+600.00     0.00  0.02  0.00  1,300,000.00 
6029+620.00     0.00  10.00  0.00  1,300,000.00 
6029+620.00     0.00  0.00  0.00  1,300,000.00 
6029+640.00     0.00  10.00  0.00  1,300,000.00 
6029+660.00     0.00  10.00  0.00  1,300,000.00 
6029+680.00     0.00  10.00  0.00  1,300,000.00 
6029+700.00     0.00  10.00  0.00  1,300,000.00 
6029+720.00     0.00  10.00  0.00  1,300,000.00 
6029+740.00     0.00  10.00  0.00  1,300,000.00 
6029+760.00     0.00  10.00  0.00  1,300,000.00 
6029+780.00     0.00  10.00  0.00  1,300,000.00 
6029+800.00     0.00  10.00  0.00  1,300,000.00 
6029+820.00     0.00  10.00  0.00  1,300,000.00 
6029+840.00     0.00  10.00  0.00  1,300,000.00 
6029+860.00     0.00  10.00  0.00  1,300,000.00 
6029+880.00     0.00  10.00  0.00  1,300,000.00 
6029+900.00     0.00  10.00  0.00  1,300,000.00 
6029+920.00     0.00  10.00  0.00  1,300,000.00 
6029+940.00     0.00  10.00  0.00  1,300,000.00 
6029+960.00     0.00  10.00  0.00  1,300,000.00 
6029+980.00     0.00  10.00  0.00  1,300,000.00 
6030+000.00     0.00  10.00  0.00  1,300,000.00 
 

TABLA 39 CÁLCULO DE ACARREOS DE SUB‐BALASTO DEL TRAMO 6036+800– 6067+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Subbalasto     distancia  Subbalasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6036+800.00     0.00        1,300,000.00 


6036+820.00     0.00  10.00  0.00  1,300,000.00 
6036+840.00     0.00  10.00  0.00  1,300,000.00 
6036+860.00     0.00  10.00  0.00  1,300,000.00 
6036+880.00     0.00  10.00  0.00  1,300,000.00 
6036+900.00     0.00  10.00  0.00  1,300,000.00 
6036+920.00     0.00  10.00  0.00  1,300,000.00 
6036+940.00     0.00  10.00  0.00  1,300,000.00 
6036+960.00     0.00  10.00  0.00  1,300,000.00 

533 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6036+980.00     0.00  10.00  0.00  1,300,000.00 


6036+992.12     0.00  6.06  0.00  1,300,000.00 
6037+000.00     0.00  3.94  0.00  1,300,000.00 
6037+020.00     0.00  10.00  0.00  1,300,000.00 
6037+040.00     0.00  10.00  0.00  1,300,000.00 
6037+060.00     0.00  10.00  0.00  1,300,000.00 
6037+080.00     0.00  10.00  0.00  1,300,000.00 
6037+100.00     0.00  10.00  0.00  1,300,000.00 
6037+120.00     0.00  10.00  0.00  1,300,000.00 
6037+140.00     0.00  10.00  0.00  1,300,000.00 
6037+142.12     0.00  1.06  0.00  1,300,000.00 
6037+160.00     0.00  8.94  0.00  1,300,000.00 
6037+180.00     0.00  10.00  0.00  1,300,000.00 
6037+200.00     0.00  10.00  0.00  1,300,000.00 
6037+220.00     0.00  10.00  0.00  1,300,000.00 
6037+240.00     0.00  10.00  0.00  1,300,000.00 
6037+260.00     0.00  10.00  0.00  1,300,000.00 
6037+280.00     0.00  10.00  0.00  1,300,000.00 
6037+300.00     0.00  10.00  0.00  1,300,000.00 
6037+316.55     0.00  8.28  0.00  1,300,000.00 
6037+320.00     0.00  1.72  0.00  1,300,000.00 
6037+340.00     0.00  10.00  0.00  1,300,000.00 
6037+360.00     0.00  10.00  0.00  1,300,000.00 
6037+380.00     0.00  10.00  0.00  1,300,000.00 
6037+400.00     0.00  10.00  0.00  1,300,000.00 
6037+420.00     0.00  10.00  0.00  1,300,000.00 
6037+440.00     0.00  10.00  0.00  1,300,000.00 
6037+460.00     0.00  10.00  0.00  1,300,000.00 
6037+466.55     0.00  3.28  0.00  1,300,000.00 
6037+480.00     0.00  6.72  0.00  1,300,000.00 
6037+500.00     0.00  10.00  0.00  1,300,000.00 
6037+520.00     0.00  10.00  0.00  1,300,000.00 
6037+540.00     0.00  10.00  0.00  1,300,000.00 
6037+560.00     0.00  10.00  0.00  1,300,000.00 
6037+580.00     0.00  10.00  0.00  1,300,000.00 
6037+600.00     0.00  10.00  0.00  1,300,000.00 
6037+620.00     0.00  10.00  0.00  1,300,000.00 
6037+640.00     0.00  10.00  0.00  1,300,000.00 
6037+660.00     0.00  10.00  0.00  1,300,000.00 
6037+680.00     0.00  10.00  0.00  1,300,000.00 
6037+700.00     0.00  10.00  0.00  1,300,000.00 
6037+720.00     0.00  10.00  0.00  1,300,000.00 
6037+740.00     0.00  10.00  0.00  1,300,000.00 
6037+760.00     0.00  10.00  0.00  1,300,000.00 
6037+780.00     0.00  10.00  0.00  1,300,000.00 
6037+800.00     0.00  10.00  0.00  1,300,000.00 
6037+820.00     0.00  10.00  0.00  1,300,000.00 
6037+840.00     0.00  10.00  0.00  1,300,000.00 
6037+860.00     0.00  10.00  0.00  1,300,000.00 
6037+880.00     0.00  10.00  0.00  1,300,000.00 
6037+900.00     0.00  10.00  0.00  1,300,000.00 

534 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6037+920.00     0.00  10.00  0.00  1,300,000.00 


6037+940.00     0.00  10.00  0.00  1,300,000.00 
6037+960.00     0.00  10.00  0.00  1,300,000.00 
6037+980.00     0.00  10.00  0.00  1,300,000.00 
6038+000.00     0.00  10.00  0.00  1,300,000.00 
6038+020.00     0.00  10.00  0.00  1,300,000.00 
6038+040.00     0.00  10.00  0.00  1,300,000.00 
6038+060.00     0.00  10.00  0.00  1,300,000.00 
6038+080.00     0.00  10.00  0.00  1,300,000.00 
6038+100.00     0.00  10.00  0.00  1,300,000.00 
6038+120.00     0.00  10.00  0.00  1,300,000.00 
6038+140.00     0.00  10.00  0.00  1,300,000.00 
6038+160.00     0.00  10.00  0.00  1,300,000.00 
6038+180.00     0.00  10.00  0.00  1,300,000.00 
6038+200.00     0.00  10.00  0.00  1,300,000.00 
6038+220.00     0.00  10.00  0.00  1,300,000.00 
6038+240.00     0.00  10.00  0.00  1,300,000.00 
6038+260.00     0.00  10.00  0.00  1,300,000.00 
6038+280.00     0.00  10.00  0.00  1,300,000.00 
6038+300.00     0.00  10.00  0.00  1,300,000.00 
6038+320.00     0.00  10.00  0.00  1,300,000.00 
6038+340.00     0.00  10.00  0.00  1,300,000.00 
6038+360.00     0.00  10.00  0.00  1,300,000.00 
6038+380.00     0.00  10.00  0.00  1,300,000.00 
6038+400.00     0.00  10.00  0.00  1,300,000.00 
6038+420.00     0.00  10.00  0.00  1,300,000.00 
6038+440.00     0.00  10.00  0.00  1,300,000.00 
6038+460.00     0.00  10.00  0.00  1,300,000.00 
6038+480.00     0.00  10.00  0.00  1,300,000.00 
6038+500.00     0.00  10.00  0.00  1,300,000.00 
6038+520.00     0.00  10.00  0.00  1,300,000.00 
6038+540.00     0.00  10.00  0.00  1,300,000.00 
6038+560.00     0.00  10.00  0.00  1,300,000.00 
6038+580.00     0.00  10.00  0.00  1,300,000.00 
6038+600.00     0.00  10.00  0.00  1,300,000.00 
6038+620.00     0.00  10.00  0.00  1,300,000.00 
6038+640.00     0.00  10.00  0.00  1,300,000.00 
6038+660.00     0.00  10.00  0.00  1,300,000.00 
6038+680.00     0.00  10.00  0.00  1,300,000.00 
6038+700.00     0.00  10.00  0.00  1,300,000.00 
6038+720.00     0.00  10.00  0.00  1,300,000.00 
6038+740.00     0.00  10.00  0.00  1,300,000.00 
6038+760.00     0.00  10.00  0.00  1,300,000.00 
6038+780.00     0.00  10.00  0.00  1,300,000.00 
6038+800.00     0.00  10.00  0.00  1,300,000.00 
6038+820.00     0.00  10.00  0.00  1,300,000.00 
6038+840.00     0.00  10.00  0.00  1,300,000.00 
6038+860.00     0.00  10.00  0.00  1,300,000.00 
6038+880.00     0.00  10.00  0.00  1,300,000.00 
6038+900.00     0.00  10.00  0.00  1,300,000.00 
6038+920.00     0.00  10.00  0.00  1,300,000.00 

535 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6038+940.00     0.00  10.00  0.00  1,300,000.00 


6038+960.00     0.00  10.00  0.00  1,300,000.00 
6038+980.00     0.00  10.00  0.00  1,300,000.00 
6039+000.00     0.00  10.00  0.00  1,300,000.00 
6039+020.00     0.00  10.00  0.00  1,300,000.00 
6039+040.00     0.00  10.00  0.00  1,300,000.00 
6039+060.00     0.00  10.00  0.00  1,300,000.00 
6039+080.00     0.00  10.00  0.00  1,300,000.00 
6039+100.00     0.00  10.00  0.00  1,300,000.00 
6039+120.00     0.00  10.00  0.00  1,300,000.00 
6039+140.00     0.00  10.00  0.00  1,300,000.00 
6039+160.00     0.00  10.00  0.00  1,300,000.00 
6039+180.00     0.00  10.00  0.00  1,300,000.00 
6039+200.00     0.00  10.00  0.00  1,300,000.00 
6039+220.00     0.00  10.00  0.00  1,300,000.00 
6039+240.00     0.00  10.00  0.00  1,300,000.00 
6039+260.00     0.00  10.00  0.00  1,300,000.00 
6039+280.00     0.00  10.00  0.00  1,300,000.00 
6039+300.00     0.00  10.00  0.00  1,300,000.00 
6039+320.00     0.00  10.00  0.00  1,300,000.00 
6039+340.00     0.00  10.00  0.00  1,300,000.00 
6039+360.00     0.00  10.00  0.00  1,300,000.00 
6039+380.00     0.00  10.00  0.00  1,300,000.00 
6039+400.00     0.00  10.00  0.00  1,300,000.00 
6039+420.00     0.00  10.00  0.00  1,300,000.00 
6039+440.00     0.00  10.00  0.00  1,300,000.00 
6039+460.00     0.00  10.00  0.00  1,300,000.00 
6039+480.00     0.00  10.00  0.00  1,300,000.00 
6039+500.00     0.00  10.00  0.00  1,300,000.00 
6039+520.00     0.00  10.00  0.00  1,300,000.00 
6039+540.00     0.00  10.00  0.00  1,300,000.00 
6039+560.00     0.00  10.00  0.00  1,300,000.00 
6039+580.00     0.00  10.00  0.00  1,300,000.00 
6039+600.00     0.00  10.00  0.00  1,300,000.00 
6039+620.00     0.00  10.00  0.00  1,300,000.00 
6039+640.00     0.00  10.00  0.00  1,300,000.00 
6039+660.00     0.00  10.00  0.00  1,300,000.00 
6039+680.00     0.00  10.00  0.00  1,300,000.00 
6039+700.00     0.00  10.00  0.00  1,300,000.00 
6039+720.00     0.00  10.00  0.00  1,300,000.00 
6039+722.65     0.00  1.33  0.00  1,300,000.00 
6039+730.00     0.00  3.67  0.00  1,300,000.00 
6039+740.00     0.00  5.00  0.00  1,300,000.00 
6039+742.65     0.00  1.33  0.00  1,300,000.00 
6039+750.00     0.00  3.67  0.00  1,300,000.00 
6039+760.00     0.00  5.00  0.00  1,300,000.00 
6039+770.00     0.00  5.00  0.00  1,300,000.00 
6039+780.00     0.00  5.00  0.00  1,300,000.00 
6039+790.00     0.00  5.00  0.00  1,300,000.00 
6039+800.00     0.00  5.00  0.00  1,300,000.00 
6039+810.00     0.00  5.00  0.00  1,300,000.00 

536 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6039+820.00     0.00  5.00  0.00  1,300,000.00 


6039+830.00     0.00  5.00  0.00  1,300,000.00 
6039+840.00     0.00  5.00  0.00  1,300,000.00 
6039+850.00     0.00  5.00  0.00  1,300,000.00 
6039+860.00     0.00  5.00  0.00  1,300,000.00 
6039+870.00     0.00  5.00  0.00  1,300,000.00 
6039+880.00     0.00  5.00  0.00  1,300,000.00 
6039+890.00     0.00  5.00  0.00  1,300,000.00 
6039+900.00     0.00  5.00  0.00  1,300,000.00 
6039+910.00     0.00  5.00  0.00  1,300,000.00 
6039+920.00     0.00  5.00  0.00  1,300,000.00 
6039+940.00     0.00  10.00  0.00  1,300,000.00 
6039+960.00     0.00  10.00  0.00  1,300,000.00 
6039+980.00     0.00  10.00  0.00  1,300,000.00 
6040+000.00     0.00  10.00  0.00  1,300,000.00 
6040+020.00     0.00  10.00  0.00  1,300,000.00 
6040+040.00     0.00  10.00  0.00  1,300,000.00 
6040+060.00     0.00  10.00  0.00  1,300,000.00 
6040+080.00     0.00  10.00  0.00  1,300,000.00 
6040+100.00     0.00  10.00  0.00  1,300,000.00 
6040+120.00     0.00  10.00  0.00  1,300,000.00 
6040+140.00     0.00  10.00  0.00  1,300,000.00 
6040+160.00     0.00  10.00  0.00  1,300,000.00 
6040+180.00     0.00  10.00  0.00  1,300,000.00 
6040+200.00     0.00  10.00  0.00  1,300,000.00 
6040+220.00     0.00  10.00  0.00  1,300,000.00 
6040+240.00     0.00  10.00  0.00  1,300,000.00 
6040+260.00     0.00  10.00  0.00  1,300,000.00 
6040+280.00     0.00  10.00  0.00  1,300,000.00 
6040+300.00     0.00  10.00  0.00  1,300,000.00 
6040+320.00     0.00  10.00  0.00  1,300,000.00 
6040+333.37     0.00  6.69  0.00  1,300,000.00 
6040+340.00     0.00  3.31  0.00  1,300,000.00 
6040+360.00     0.00  10.00  0.00  1,300,000.00 
6040+380.00     0.00  10.00  0.00  1,300,000.00 
6040+400.00     0.00  10.00  0.00  1,300,000.00 
6040+420.00     0.00  10.00  0.00  1,300,000.00 
6040+440.00     0.00  10.00  0.00  1,300,000.00 
6040+460.00     0.00  10.00  0.00  1,300,000.00 
6040+480.00     0.00  10.00  0.00  1,300,000.00 
6040+483.37     0.00  1.69  0.00  1,300,000.00 
6040+500.00     0.00  8.31  0.00  1,300,000.00 
6040+520.00     0.00  10.00  0.00  1,300,000.00 
6040+540.00     0.00  10.00  0.00  1,300,000.00 
6040+560.00     0.00  10.00  0.00  1,300,000.00 
6040+580.00     0.00  10.00  0.00  1,300,000.00 
6040+600.00     0.00  10.00  0.00  1,300,000.00 
6040+620.00     0.00  10.00  0.00  1,300,000.00 
6040+640.00     0.00  10.00  0.00  1,300,000.00 
6040+660.00     0.00  10.00  0.00  1,300,000.00 
6040+680.00     0.00  10.00  0.00  1,300,000.00 

537 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6040+700.00     0.00  10.00  0.00  1,300,000.00 


6040+720.00     0.00  10.00  0.00  1,300,000.00 
6040+740.00     0.00  10.00  0.00  1,300,000.00 
6040+760.00     0.00  10.00  0.00  1,300,000.00 
6040+780.00     0.00  10.00  0.00  1,300,000.00 
6040+781.48     0.00  0.74  0.00  1,300,000.00 
6040+800.00     0.00  9.26  0.00  1,300,000.00 
6040+820.00     0.00  10.00  0.00  1,300,000.00 
6040+840.00     0.00  10.00  0.00  1,300,000.00 
6040+860.00     0.00  10.00  0.00  1,300,000.00 
6040+880.00     0.00  10.00  0.00  1,300,000.00 
6040+900.00     0.00  10.00  0.00  1,300,000.00 
6040+920.00     0.00  10.00  0.00  1,300,000.00 
6040+931.48     0.00  5.74  0.00  1,300,000.00 
6040+940.00     0.00  4.26  0.00  1,300,000.00 
6040+960.00     0.00  10.00  0.00  1,300,000.00 
6040+980.00     0.00  10.00  0.00  1,300,000.00 
6041+000.00     0.00  10.00  0.00  1,300,000.00 
6041+020.00     0.00  10.00  0.00  1,300,000.00 
6041+040.00     0.00  10.00  0.00  1,300,000.00 
6041+060.00     0.00  10.00  0.00  1,300,000.00 
6041+080.00     0.00  10.00  0.00  1,300,000.00 
6041+100.00     0.00  10.00  0.00  1,300,000.00 
6041+120.00     0.00  10.00  0.00  1,300,000.00 
6041+140.00     0.00  10.00  0.00  1,300,000.00 
6041+160.00     0.00  10.00  0.00  1,300,000.00 
6041+180.00     0.00  10.00  0.00  1,300,000.00 
6041+200.00     0.00  10.00  0.00  1,300,000.00 
6041+220.00     0.00  10.00  0.00  1,300,000.00 
6041+240.00     0.00  10.00  0.00  1,300,000.00 
6041+260.00     0.00  10.00  0.00  1,300,000.00 
6041+280.00     0.00  10.00  0.00  1,300,000.00 
6041+300.00     0.00  10.00  0.00  1,300,000.00 
6041+320.00     0.00  10.00  0.00  1,300,000.00 
6041+340.00     0.00  10.00  0.00  1,300,000.00 
6041+360.00     0.00  10.00  0.00  1,300,000.00 
6041+380.00     0.00  10.00  0.00  1,300,000.00 
6041+390.00     0.00  5.00  0.00  1,300,000.00 
6041+400.00     0.00  5.00  0.00  1,300,000.00 
6041+410.00     0.00  5.00  0.00  1,300,000.00 
6041+420.00     0.00  5.00  0.00  1,300,000.00 
6041+430.00     0.00  5.00  0.00  1,300,000.00 
6041+440.00     0.00  5.00  0.00  1,300,000.00 
6041+450.00     0.00  5.00  0.00  1,300,000.00 
6041+460.00     0.00  5.00  0.00  1,300,000.00 
6041+470.00     0.00  5.00  0.00  1,300,000.00 
6041+480.00     0.00  5.00  0.00  1,300,000.00 
6041+490.00     0.00  5.00  0.00  1,300,000.00 
6041+500.00     0.00  5.00  0.00  1,300,000.00 
6041+510.00     0.00  5.00  0.00  1,300,000.00 
6041+520.00     0.00  5.00  0.00  1,300,000.00 

538 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6041+530.00     0.00  5.00  0.00  1,300,000.00 


6041+540.00     0.00  5.00  0.00  1,300,000.00 
6041+550.00     0.00  5.00  0.00  1,300,000.00 
6041+560.00     0.00  5.00  0.00  1,300,000.00 
6041+564.54     0.00  2.27  0.00  1,300,000.00 
6041+570.00     0.00  2.73  0.00  1,300,000.00 
6041+580.00     0.00  5.00  0.00  1,300,000.00 
6041+584.54     0.00  2.27  0.00  1,300,000.00 
6041+600.00     0.00  7.73  0.00  1,300,000.00 
6041+620.00     0.00  10.00  0.00  1,300,000.00 
6041+640.00     0.00  10.00  0.00  1,300,000.00 
6041+660.00     0.00  10.00  0.00  1,300,000.00 
6041+680.00     0.00  10.00  0.00  1,300,000.00 
6041+700.00     0.00  10.00  0.00  1,300,000.00 
6041+720.00     0.00  10.00  0.00  1,300,000.00 
6041+740.00     0.00  10.00  0.00  1,300,000.00 
6041+760.00     0.00  10.00  0.00  1,300,000.00 
6041+780.00     0.00  10.00  0.00  1,300,000.00 
6041+800.00     0.00  10.00  0.00  1,300,000.00 
6041+820.00     0.00  10.00  0.00  1,300,000.00 
6041+840.00     0.00  10.00  0.00  1,300,000.00 
6041+860.00     0.00  10.00  0.00  1,300,000.00 
6041+880.00     0.00  10.00  0.00  1,300,000.00 
6041+900.00     0.00  10.00  0.00  1,300,000.00 
6041+920.00     0.00  10.00  0.00  1,300,000.00 
6041+940.00     0.00  10.00  0.00  1,300,000.00 
6041+960.00     0.00  10.00  0.00  1,300,000.00 
6041+980.00     0.00  10.00  0.00  1,300,000.00 
6042+000.00     0.00  10.00  0.00  1,300,000.00 
6042+020.00     0.00  10.00  0.00  1,300,000.00 
6042+040.00     0.00  10.00  0.00  1,300,000.00 
6042+060.00     0.00  10.00  0.00  1,300,000.00 
6042+080.00     0.00  10.00  0.00  1,300,000.00 
6042+100.00     0.00  10.00  0.00  1,300,000.00 
6042+120.00     0.00  10.00  0.00  1,300,000.00 
6042+140.00     0.00  10.00  0.00  1,300,000.00 
6042+160.00     0.00  10.00  0.00  1,300,000.00 
6042+180.00     0.00  10.00  0.00  1,300,000.00 
6042+200.00     0.00  10.00  0.00  1,300,000.00 
6042+220.00     0.00  10.00  0.00  1,300,000.00 
6042+240.00     0.00  10.00  0.00  1,300,000.00 
6042+260.00     0.00  10.00  0.00  1,300,000.00 
6042+280.00     0.00  10.00  0.00  1,300,000.00 
6042+300.00     0.00  10.00  0.00  1,300,000.00 
6042+320.00     0.00  10.00  0.00  1,300,000.00 
6042+340.00     0.00  10.00  0.00  1,300,000.00 
6042+360.00     0.00  10.00  0.00  1,300,000.00 
6042+380.00     0.00  10.00  0.00  1,300,000.00 
6042+400.00     0.00  10.00  0.00  1,300,000.00 
6042+420.00     0.00  10.00  0.00  1,300,000.00 
6042+440.00     0.00  10.00  0.00  1,300,000.00 

539 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6042+460.00     0.00  10.00  0.00  1,300,000.00 


6042+480.00     0.00  10.00  0.00  1,300,000.00 
6042+500.00     0.00  10.00  0.00  1,300,000.00 
6042+520.00     0.00  10.00  0.00  1,300,000.00 
6042+540.00     0.00  10.00  0.00  1,300,000.00 
6042+560.00     0.00  10.00  0.00  1,300,000.00 
6042+580.00     0.00  10.00  0.00  1,300,000.00 
6042+600.00     0.00  10.00  0.00  1,300,000.00 
6042+620.00     0.00  10.00  0.00  1,300,000.00 
6042+640.00     0.00  10.00  0.00  1,300,000.00 
6042+660.00     0.00  10.00  0.00  1,300,000.00 
6042+680.00     0.00  10.00  0.00  1,300,000.00 
6042+700.00     0.00  10.00  0.00  1,300,000.00 
6042+720.00     0.00  10.00  0.00  1,300,000.00 
6042+740.00     0.00  10.00  0.00  1,300,000.00 
6042+760.00     0.00  10.00  0.00  1,300,000.00 
6042+780.00     0.00  10.00  0.00  1,300,000.00 
6042+800.00     0.00  10.00  0.00  1,300,000.00 
6042+820.00     0.00  10.00  0.00  1,300,000.00 
6042+840.00     0.00  10.00  0.00  1,300,000.00 
6042+860.00     0.00  10.00  0.00  1,300,000.00 
6042+880.00     0.00  10.00  0.00  1,300,000.00 
6042+900.00     0.00  10.00  0.00  1,300,000.00 
6042+920.00     0.00  10.00  0.00  1,300,000.00 
6042+940.00     0.00  10.00  0.00  1,300,000.00 
6042+960.00     0.00  10.00  0.00  1,300,000.00 
6042+980.00     0.00  10.00  0.00  1,300,000.00 
6043+000.00     0.00  10.00  0.00  1,300,000.00 
6043+020.00     0.00  10.00  0.00  1,300,000.00 
6043+040.00     0.00  10.00  0.00  1,300,000.00 
6043+060.00     0.00  10.00  0.00  1,300,000.00 
6043+080.00     0.00  10.00  0.00  1,300,000.00 
6043+100.00     0.00  10.00  0.00  1,300,000.00 
6043+120.00     0.00  10.00  0.00  1,300,000.00 
6043+140.00     0.00  10.00  0.00  1,300,000.00 
6043+160.00     0.00  10.00  0.00  1,300,000.00 
6043+180.00     0.00  10.00  0.00  1,300,000.00 
6043+200.00     0.00  10.00  0.00  1,300,000.00 
6043+220.00     0.00  10.00  0.00  1,300,000.00 
6043+240.00     0.00  10.00  0.00  1,300,000.00 
6043+260.00     0.00  10.00  0.00  1,300,000.00 
6043+280.00     0.00  10.00  0.00  1,300,000.00 
6043+300.00     0.00  10.00  0.00  1,300,000.00 
6043+320.00     0.00  10.00  0.00  1,300,000.00 
6043+340.00     0.00  10.00  0.00  1,300,000.00 
6043+360.00     0.00  10.00  0.00  1,300,000.00 
6043+380.00     0.00  10.00  0.00  1,300,000.00 
6043+400.00     0.00  10.00  0.00  1,300,000.00 
6043+420.00     0.00  10.00  0.00  1,300,000.00 
6043+440.00     0.00  10.00  0.00  1,300,000.00 
6043+460.00     0.00  10.00  0.00  1,300,000.00 

540 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6043+480.00     0.00  10.00  0.00  1,300,000.00 


6043+500.00     0.00  10.00  0.00  1,300,000.00 
6043+520.00     0.00  10.00  0.00  1,300,000.00 
6043+540.00     0.00  10.00  0.00  1,300,000.00 
6043+560.00     0.00  10.00  0.00  1,300,000.00 
6043+580.00     0.00  10.00  0.00  1,300,000.00 
6043+600.00     0.00  10.00  0.00  1,300,000.00 
6043+620.00     0.00  10.00  0.00  1,300,000.00 
6043+640.00     0.00  10.00  0.00  1,300,000.00 
6043+660.00     0.00  10.00  0.00  1,300,000.00 
6043+680.00     0.00  10.00  0.00  1,300,000.00 
6043+700.00     0.00  10.00  0.00  1,300,000.00 
6043+720.00     0.00  10.00  0.00  1,300,000.00 
6043+740.00     0.00  10.00  0.00  1,300,000.00 
6043+760.00     0.00  10.00  0.00  1,300,000.00 
6043+780.00     0.00  10.00  0.00  1,300,000.00 
6043+800.00     0.00  10.00  0.00  1,300,000.00 
6043+820.00     0.00  10.00  0.00  1,300,000.00 
6043+840.00     0.00  10.00  0.00  1,300,000.00 
6043+860.00     0.00  10.00  0.00  1,300,000.00 
6043+880.00     0.00  10.00  0.00  1,300,000.00 
6043+900.00     0.00  10.00  0.00  1,300,000.00 
6043+920.00     0.00  10.00  0.00  1,300,000.00 
6043+940.00     0.00  10.00  0.00  1,300,000.00 
6043+960.00     0.00  10.00  0.00  1,300,000.00 
6043+980.00     0.00  10.00  0.00  1,300,000.00 
6044+000.00     0.00  10.00  0.00  1,300,000.00 
6044+020.00     0.00  10.00  0.00  1,300,000.00 
6044+040.00     0.00  10.00  0.00  1,300,000.00 
6044+060.00     0.00  10.00  0.00  1,300,000.00 
6044+080.00     0.00  10.00  0.00  1,300,000.00 
6044+100.00     0.00  10.00  0.00  1,300,000.00 
6044+120.00     0.00  10.00  0.00  1,300,000.00 
6044+140.00     0.00  10.00  0.00  1,300,000.00 
6044+160.00     0.00  10.00  0.00  1,300,000.00 
6044+180.00     0.00  10.00  0.00  1,300,000.00 
6044+185.00     0.00  2.50  0.00  1,300,000.00 
6044+185.00     0.00  0.00  0.00  1,300,000.00 
6044+200.00     0.00  7.50  0.00  1,300,000.00 
6044+220.00     0.00  10.00  0.00  1,300,000.00 
6044+240.00     0.00  10.00  0.00  1,300,000.00 
6044+260.00     0.00  10.00  0.00  1,300,000.00 
6044+280.00     0.00  10.00  0.00  1,300,000.00 
6044+300.00     0.00  10.00  0.00  1,300,000.00 
6044+320.00     0.00  10.00  0.00  1,300,000.00 
6044+320.00     0.00  0.00  0.00  1,300,000.00 
6044+340.00     0.00  10.00  0.00  1,300,000.00 
6044+360.00     0.00  10.00  0.00  1,300,000.00 
6044+370.00     0.00  5.00  0.00  1,300,000.00 
6044+380.00     0.00  5.00  0.00  1,300,000.00 
6044+400.00     0.00  10.00  0.00  1,300,000.00 

541 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6044+420.00     0.00  10.00  0.00  1,300,000.00 


6044+440.00     0.00  10.00  0.00  1,300,000.00 
6044+460.00     0.00  10.00  0.00  1,300,000.00 
6044+480.00     0.00  10.00  0.00  1,300,000.00 
6044+500.00     0.00  10.00  0.00  1,300,000.00 
6044+520.00     0.00  10.00  0.00  1,300,000.00 
6044+540.00     0.00  10.00  0.00  1,300,000.00 
6044+560.00     0.00  10.00  0.00  1,300,000.00 
6044+580.00     0.00  10.00  0.00  1,300,000.00 
6044+600.00     0.00  10.00  0.00  1,300,000.00 
6044+620.00     0.00  10.00  0.00  1,300,000.00 
6044+640.00     0.00  10.00  0.00  1,300,000.00 
6044+660.00     0.00  10.00  0.00  1,300,000.00 
6044+680.00     0.00  10.00  0.00  1,300,000.00 
6044+700.00     0.00  10.00  0.00  1,300,000.00 
6044+720.00     0.00  10.00  0.00  1,300,000.00 
6044+740.00     0.00  10.00  0.00  1,300,000.00 
6044+760.00     0.00  10.00  0.00  1,300,000.00 
6044+780.00     0.00  10.00  0.00  1,300,000.00 
6044+800.00     0.00  10.00  0.00  1,300,000.00 
6044+820.00     0.00  10.00  0.00  1,300,000.00 
6044+840.00     0.00  10.00  0.00  1,300,000.00 
6044+860.00     0.00  10.00  0.00  1,300,000.00 
6044+880.00     0.00  10.00  0.00  1,300,000.00 
6044+900.00     0.00  10.00  0.00  1,300,000.00 
6044+920.00     0.00  10.00  0.00  1,300,000.00 
6044+940.00     0.00  10.00  0.00  1,300,000.00 
6044+960.00     0.00  10.00  0.00  1,300,000.00 
6044+980.00     0.00  10.00  0.00  1,300,000.00 
6045+000.00     0.00  10.00  0.00  1,300,000.00 
6045+020.00     0.00  10.00  0.00  1,300,000.00 
6045+040.00     0.00  10.00  0.00  1,300,000.00 
6045+060.00     0.00  10.00  0.00  1,300,000.00 
6045+080.00     0.00  10.00  0.00  1,300,000.00 
6045+100.00     0.00  10.00  0.00  1,300,000.00 
6045+120.00     0.00  10.00  0.00  1,300,000.00 
6045+140.00     0.00  10.00  0.00  1,300,000.00 
6045+160.00     0.00  10.00  0.00  1,300,000.00 
6045+180.00     0.00  10.00  0.00  1,300,000.00 
6045+200.00     0.00  10.00  0.00  1,300,000.00 
6045+220.00     0.00  10.00  0.00  1,300,000.00 
6045+240.00     0.00  10.00  0.00  1,300,000.00 
6045+260.00     0.00  10.00  0.00  1,300,000.00 
6045+280.00     0.00  10.00  0.00  1,300,000.00 
6045+300.00     0.00  10.00  0.00  1,300,000.00 
6045+320.00     0.00  10.00  0.00  1,300,000.00 
6045+340.00     0.00  10.00  0.00  1,300,000.00 
6045+360.00     0.00  10.00  0.00  1,300,000.00 
6045+380.00     0.00  10.00  0.00  1,300,000.00 
6045+400.00     0.00  10.00  0.00  1,300,000.00 
6045+420.00     0.00  10.00  0.00  1,300,000.00 

542 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6045+440.00     0.00  10.00  0.00  1,300,000.00 


6045+460.00     0.00  10.00  0.00  1,300,000.00 
6045+480.00     0.00  10.00  0.00  1,300,000.00 
6045+500.00     0.00  10.00  0.00  1,300,000.00 
6045+520.00     0.00  10.00  0.00  1,300,000.00 
6045+540.00     0.00  10.00  0.00  1,300,000.00 
6045+560.00     0.00  10.00  0.00  1,300,000.00 
6045+580.00     0.00  10.00  0.00  1,300,000.00 
6045+600.00     0.00  10.00  0.00  1,300,000.00 
6045+620.00     0.00  10.00  0.00  1,300,000.00 
6045+640.00     0.00  10.00  0.00  1,300,000.00 
6045+660.00     0.00  10.00  0.00  1,300,000.00 
6045+680.00     0.00  10.00  0.00  1,300,000.00 
6045+700.00     0.00  10.00  0.00  1,300,000.00 
6045+720.00     0.00  10.00  0.00  1,300,000.00 
6045+740.00     0.00  10.00  0.00  1,300,000.00 
6045+760.00     0.00  10.00  0.00  1,300,000.00 
6045+780.00     0.00  10.00  0.00  1,300,000.00 
6045+800.00     0.00  10.00  0.00  1,300,000.00 
6045+820.00     0.00  10.00  0.00  1,300,000.00 
6045+840.00     0.00  10.00  0.00  1,300,000.00 
6045+860.00     0.00  10.00  0.00  1,300,000.00 
6045+880.00     0.00  10.00  0.00  1,300,000.00 
6045+900.00     0.00  10.00  0.00  1,300,000.00 
6045+920.00     0.00  10.00  0.00  1,300,000.00 
6045+940.00     0.00  10.00  0.00  1,300,000.00 
6045+960.00     0.00  10.00  0.00  1,300,000.00 
6045+980.00     0.00  10.00  0.00  1,300,000.00 
6046+000.00     0.00  10.00  0.00  1,300,000.00 
6046+020.00     0.00  10.00  0.00  1,300,000.00 
6046+040.00     0.00  10.00  0.00  1,300,000.00 
6046+060.00     0.00  10.00  0.00  1,300,000.00 
6046+080.00     0.00  10.00  0.00  1,300,000.00 
6046+100.00     0.00  10.00  0.00  1,300,000.00 
6046+120.00     0.00  10.00  0.00  1,300,000.00 
6046+140.00     0.00  10.00  0.00  1,300,000.00 
6046+160.00     0.00  10.00  0.00  1,300,000.00 
6046+180.00     0.00  10.00  0.00  1,300,000.00 
6046+200.00     0.00  10.00  0.00  1,300,000.00 
6046+220.00     0.00  10.00  0.00  1,300,000.00 
6046+240.00     0.00  10.00  0.00  1,300,000.00 
6046+260.00     0.00  10.00  0.00  1,300,000.00 
6046+280.00     0.00  10.00  0.00  1,300,000.00 
6046+300.00     0.00  10.00  0.00  1,300,000.00 
6046+320.00     0.00  10.00  0.00  1,300,000.00 
6046+340.00     0.00  10.00  0.00  1,300,000.00 
6046+360.00     0.00  10.00  0.00  1,300,000.00 
6046+380.00     0.00  10.00  0.00  1,300,000.00 
6046+400.00     0.00  10.00  0.00  1,300,000.00 
6046+420.00     0.00  10.00  0.00  1,300,000.00 
6046+440.00     0.00  10.00  0.00  1,300,000.00 

543 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6046+460.00     0.00  10.00  0.00  1,300,000.00 


6046+480.00     0.00  10.00  0.00  1,300,000.00 
6046+500.00     0.00  10.00  0.00  1,300,000.00 
6046+520.00     0.00  10.00  0.00  1,300,000.00 
6046+540.00     0.00  10.00  0.00  1,300,000.00 
6046+560.00     0.00  10.00  0.00  1,300,000.00 
6046+580.00     0.00  10.00  0.00  1,300,000.00 
6046+600.00     0.00  10.00  0.00  1,300,000.00 
6046+620.00     0.00  10.00  0.00  1,300,000.00 
6046+640.00     0.00  10.00  0.00  1,300,000.00 
6046+660.00     0.00  10.00  0.00  1,300,000.00 
6046+680.00     0.00  10.00  0.00  1,300,000.00 
6046+700.00     0.00  10.00  0.00  1,300,000.00 
6046+720.00     0.00  10.00  0.00  1,300,000.00 
6046+740.00     0.00  10.00  0.00  1,300,000.00 
6046+760.00     0.00  10.00  0.00  1,300,000.00 
6046+780.00     0.00  10.00  0.00  1,300,000.00 
6046+800.00     0.00  10.00  0.00  1,300,000.00 
6046+820.00     0.00  10.00  0.00  1,300,000.00 
6046+840.00     0.00  10.00  0.00  1,300,000.00 
6046+860.00     0.00  10.00  0.00  1,300,000.00 
6046+880.00     0.00  10.00  0.00  1,300,000.00 
6046+900.00     0.00  10.00  0.00  1,300,000.00 
6046+920.00     0.00  10.00  0.00  1,300,000.00 
6046+940.00     0.00  10.00  0.00  1,300,000.00 
6046+960.00     0.00  10.00  0.00  1,300,000.00 
6046+980.00     0.00  10.00  0.00  1,300,000.00 
6047+000.00     0.00  10.00  0.00  1,300,000.00 
6047+000.00     0.00  0.00  0.00  1,300,000.00 
6047+020.00     0.00  10.00  0.00  1,300,000.00 
6047+040.00     0.00  10.00  0.00  1,300,000.00 
6047+060.00     0.00  10.00  0.00  1,300,000.00 
6047+060.00     0.00  0.00  0.00  1,300,000.00 
6047+080.00     0.00  10.00  0.00  1,300,000.00 
6047+100.00     0.00  10.00  0.00  1,300,000.00 
6047+120.00     0.00  10.00  0.00  1,300,000.00 
6047+140.00     0.00  10.00  0.00  1,300,000.00 
6047+160.00     0.00  10.00  0.00  1,300,000.00 
6047+180.00     0.00  10.00  0.00  1,300,000.00 
6047+200.00     0.00  10.00  0.00  1,300,000.00 
6047+220.00     0.00  10.00  0.00  1,300,000.00 
6047+240.00     0.00  10.00  0.00  1,300,000.00 
6047+260.00     0.00  10.00  0.00  1,300,000.00 
6047+280.00     0.00  10.00  0.00  1,300,000.00 
6047+300.00     0.00  10.00  0.00  1,300,000.00 
6047+320.00     0.00  10.00  0.00  1,300,000.00 
6047+340.00     0.00  10.00  0.00  1,300,000.00 
6047+360.00     0.00  10.00  0.00  1,300,000.00 
6047+380.00     0.00  10.00  0.00  1,300,000.00 
6047+400.00     0.00  10.00  0.00  1,300,000.00 
6047+420.00     0.00  10.00  0.00  1,300,000.00 

544 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6047+440.00     0.00  10.00  0.00  1,300,000.00 


6047+460.00     0.00  10.00  0.00  1,300,000.00 
6047+480.00     0.00  10.00  0.00  1,300,000.00 
6047+500.00     0.00  10.00  0.00  1,300,000.00 
6047+510.00     0.00  5.00  0.00  1,300,000.00 
6047+510.00     0.00  0.00  0.00  1,300,000.00 
6047+520.00     0.00  5.00  0.00  1,300,000.00 
6047+540.00     0.00  10.00  0.00  1,300,000.00 
6047+560.00     0.00  10.00  0.00  1,300,000.00 
6047+580.00     0.00  10.00  0.00  1,300,000.00 
6047+580.00     0.00  0.00  0.00  1,300,000.00 
6047+600.00     0.00  10.00  0.00  1,300,000.00 
6047+620.00     0.00  10.00  0.00  1,300,000.00 
6047+640.00     0.00  10.00  0.00  1,300,000.00 
6047+660.00     0.00  10.00  0.00  1,300,000.00 
6047+680.00     0.00  10.00  0.00  1,300,000.00 
6047+700.00     0.00  10.00  0.00  1,300,000.00 
6047+720.00     0.00  10.00  0.00  1,300,000.00 
6047+740.00     0.00  10.00  0.00  1,300,000.00 
6047+760.00     0.00  10.00  0.00  1,300,000.00 
6047+780.00     0.00  10.00  0.00  1,300,000.00 
6047+800.00     0.00  10.00  0.00  1,300,000.00 
6047+820.00     0.00  10.00  0.00  1,300,000.00 
6047+840.00     0.00  10.00  0.00  1,300,000.00 
6047+860.00     0.00  10.00  0.00  1,300,000.00 
6047+880.00     0.00  10.00  0.00  1,300,000.00 
6047+900.00     0.00  10.00  0.00  1,300,000.00 
6047+920.00     0.00  10.00  0.00  1,300,000.00 
6047+940.00     0.00  10.00  0.00  1,300,000.00 
6047+960.00     0.00  10.00  0.00  1,300,000.00 
6047+980.00     0.00  10.00  0.00  1,300,000.00 
6048+000.00     0.00  10.00  0.00  1,300,000.00 
6048+020.00     0.00  10.00  0.00  1,300,000.00 
6048+040.00     0.00  10.00  0.00  1,300,000.00 
6048+060.00     0.00  10.00  0.00  1,300,000.00 
6048+080.00     0.00  10.00  0.00  1,300,000.00 
6048+100.00     0.00  10.00  0.00  1,300,000.00 
6048+120.00     0.00  10.00  0.00  1,300,000.00 
6048+140.00     0.00  10.00  0.00  1,300,000.00 
6048+160.00     0.00  10.00  0.00  1,300,000.00 
6048+180.00     0.00  10.00  0.00  1,300,000.00 
6048+200.00     0.00  10.00  0.00  1,300,000.00 
6048+220.00     0.00  10.00  0.00  1,300,000.00 
6048+240.00     0.00  10.00  0.00  1,300,000.00 
6048+260.00     0.00  10.00  0.00  1,300,000.00 
6048+280.00     0.00  10.00  0.00  1,300,000.00 
6048+300.00     0.00  10.00  0.00  1,300,000.00 
6048+320.00     0.00  10.00  0.00  1,300,000.00 
6048+340.00     0.00  10.00  0.00  1,300,000.00 
6048+360.00     0.00  10.00  0.00  1,300,000.00 
6048+380.00     0.00  10.00  0.00  1,300,000.00 

545 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6048+400.00     0.00  10.00  0.00  1,300,000.00 


6048+420.00     0.00  10.00  0.00  1,300,000.00 
6048+440.00     0.00  10.00  0.00  1,300,000.00 
6048+460.00     0.00  10.00  0.00  1,300,000.00 
6048+480.00     0.00  10.00  0.00  1,300,000.00 
6048+500.00     0.00  10.00  0.00  1,300,000.00 
6048+520.00     0.00  10.00  0.00  1,300,000.00 
6048+540.00     0.00  10.00  0.00  1,300,000.00 
6048+560.00     0.00  10.00  0.00  1,300,000.00 
6048+580.00     0.00  10.00  0.00  1,300,000.00 
6048+600.00     0.00  10.00  0.00  1,300,000.00 
6048+620.00     0.00  10.00  0.00  1,300,000.00 
6048+640.00     0.00  10.00  0.00  1,300,000.00 
6048+660.00     0.00  10.00  0.00  1,300,000.00 
6048+680.00     0.00  10.00  0.00  1,300,000.00 
6048+700.00     0.00  10.00  0.00  1,300,000.00 
6048+720.00     0.00  10.00  0.00  1,300,000.00 
6048+740.00     0.00  10.00  0.00  1,300,000.00 
6048+760.00     0.00  10.00  0.00  1,300,000.00 
6048+780.00     0.00  10.00  0.00  1,300,000.00 
6048+800.00     0.00  10.00  0.00  1,300,000.00 
6048+820.00     0.00  10.00  0.00  1,300,000.00 
6048+840.00     0.00  10.00  0.00  1,300,000.00 
6048+860.00     0.00  10.00  0.00  1,300,000.00 
6048+880.00     0.00  10.00  0.00  1,300,000.00 
6048+900.00     0.00  10.00  0.00  1,300,000.00 
6048+920.00     0.00  10.00  0.00  1,300,000.00 
6048+940.00     0.00  10.00  0.00  1,300,000.00 
6048+960.00     0.00  10.00  0.00  1,300,000.00 
6048+980.00     0.00  10.00  0.00  1,300,000.00 
6049+000.00     0.00  10.00  0.00  1,300,000.00 
6049+020.00     0.00  10.00  0.00  1,300,000.00 
6049+040.00     0.00  10.00  0.00  1,300,000.00 
6049+060.00     0.00  10.00  0.00  1,300,000.00 
6049+080.00     0.00  10.00  0.00  1,300,000.00 
6049+100.00     0.00  10.00  0.00  1,300,000.00 
6049+120.00     0.00  10.00  0.00  1,300,000.00 
6049+140.00     0.00  10.00  0.00  1,300,000.00 
6049+160.00     0.00  10.00  0.00  1,300,000.00 
6049+180.00     0.00  10.00  0.00  1,300,000.00 
6049+200.00     0.00  10.00  0.00  1,300,000.00 
6049+220.00     0.00  10.00  0.00  1,300,000.00 
6049+240.00     0.00  10.00  0.00  1,300,000.00 
6049+260.00     0.00  10.00  0.00  1,300,000.00 
6049+280.00     0.00  10.00  0.00  1,300,000.00 
6049+300.00     0.00  10.00  0.00  1,300,000.00 
6049+320.00     0.00  10.00  0.00  1,300,000.00 
6049+340.00     0.00  10.00  0.00  1,300,000.00 
6049+360.00     0.00  10.00  0.00  1,300,000.00 
6049+380.00     0.00  10.00  0.00  1,300,000.00 
6049+400.00     0.00  10.00  0.00  1,300,000.00 

546 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6049+420.00     0.00  10.00  0.00  1,300,000.00 


6049+440.00     0.00  10.00  0.00  1,300,000.00 
6049+460.00     0.00  10.00  0.00  1,300,000.00 
6049+480.00     0.00  10.00  0.00  1,300,000.00 
6049+500.00     0.00  10.00  0.00  1,300,000.00 
6049+520.00     0.00  10.00  0.00  1,300,000.00 
6049+540.00     0.00  10.00  0.00  1,300,000.00 
6049+560.00     0.00  10.00  0.00  1,300,000.00 
6049+580.00     0.00  10.00  0.00  1,300,000.00 
6049+600.00     0.00  10.00  0.00  1,300,000.00 
6049+620.00     0.00  10.00  0.00  1,300,000.00 
6049+640.00     0.00  10.00  0.00  1,300,000.00 
6049+660.00     0.00  10.00  0.00  1,300,000.00 
6049+680.00     0.00  10.00  0.00  1,300,000.00 
6049+700.00     0.00  10.00  0.00  1,300,000.00 
6049+720.00     0.00  10.00  0.00  1,300,000.00 
6049+740.00     0.00  10.00  0.00  1,300,000.00 
6049+760.00     0.00  10.00  0.00  1,300,000.00 
6049+780.00     0.00  10.00  0.00  1,300,000.00 
6049+800.00     0.00  10.00  0.00  1,300,000.00 
6049+820.00     0.00  10.00  0.00  1,300,000.00 
6049+840.00     0.00  10.00  0.00  1,300,000.00 
6049+860.00     0.00  10.00  0.00  1,300,000.00 
6049+880.00     0.00  10.00  0.00  1,300,000.00 
6049+900.00     0.00  10.00  0.00  1,300,000.00 
6049+920.00     0.00  10.00  0.00  1,300,000.00 
6049+940.00     0.00  10.00  0.00  1,300,000.00 
6049+960.00     0.00  10.00  0.00  1,300,000.00 
6049+980.00     0.00  10.00  0.00  1,300,000.00 
6050+000.00     0.00  10.00  0.00  1,300,000.00 
6050+020.00     0.00  10.00  0.00  1,300,000.00 
6050+040.00     0.00  10.00  0.00  1,300,000.00 
6050+060.00     0.00  10.00  0.00  1,300,000.00 
6050+080.00     0.00  10.00  0.00  1,300,000.00 
6050+100.00     0.00  10.00  0.00  1,300,000.00 
6050+120.00     0.00  10.00  0.00  1,300,000.00 
6050+140.00     0.00  10.00  0.00  1,300,000.00 
6050+160.00     0.00  10.00  0.00  1,300,000.00 
6050+180.00     0.00  10.00  0.00  1,300,000.00 
6050+200.00     0.00  10.00  0.00  1,300,000.00 
6050+220.00     0.00  10.00  0.00  1,300,000.00 
6050+240.00     0.00  10.00  0.00  1,300,000.00 
6050+260.00     0.00  10.00  0.00  1,300,000.00 
6050+280.00     0.00  10.00  0.00  1,300,000.00 
6050+300.00     0.00  10.00  0.00  1,300,000.00 
6050+320.00     0.00  10.00  0.00  1,300,000.00 
6050+340.00     0.00  10.00  0.00  1,300,000.00 
6050+360.00     0.00  10.00  0.00  1,300,000.00 
6050+380.00     0.00  10.00  0.00  1,300,000.00 
6050+400.00     0.00  10.00  0.00  1,300,000.00 
6050+420.00     0.00  10.00  0.00  1,300,000.00 

547 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6050+440.00     0.00  10.00  0.00  1,300,000.00 


6050+460.00     0.00  10.00  0.00  1,300,000.00 
6050+480.00     0.00  10.00  0.00  1,300,000.00 
6050+500.00     0.00  10.00  0.00  1,300,000.00 
6050+520.00     0.00  10.00  0.00  1,300,000.00 
6050+540.00     0.00  10.00  0.00  1,300,000.00 
6050+560.00     0.00  10.00  0.00  1,300,000.00 
6050+580.00     0.00  10.00  0.00  1,300,000.00 
6050+600.00     0.00  10.00  0.00  1,300,000.00 
6050+620.00     0.00  10.00  0.00  1,300,000.00 
6050+640.00     0.00  10.00  0.00  1,300,000.00 
6050+660.00     0.00  10.00  0.00  1,300,000.00 
6050+680.00     0.00  10.00  0.00  1,300,000.00 
6050+700.00     0.00  10.00  0.00  1,300,000.00 
6050+720.00     0.00  10.00  0.00  1,300,000.00 
6050+740.00     0.00  10.00  0.00  1,300,000.00 
6050+760.00     0.00  10.00  0.00  1,300,000.00 
6050+780.00     0.00  10.00  0.00  1,300,000.00 
6050+800.00     0.00  10.00  0.00  1,300,000.00 
6050+820.00     0.00  10.00  0.00  1,300,000.00 
6050+840.00     0.00  10.00  0.00  1,300,000.00 
6050+860.00     0.00  10.00  0.00  1,300,000.00 
6050+880.00     0.00  10.00  0.00  1,300,000.00 
6050+900.00     0.00  10.00  0.00  1,300,000.00 
6050+920.00     0.00  10.00  0.00  1,300,000.00 
6050+940.00     0.00  10.00  0.00  1,300,000.00 
6050+960.00     0.00  10.00  0.00  1,300,000.00 
6050+980.00     0.00  10.00  0.00  1,300,000.00 
6051+000.00     0.00  10.00  0.00  1,300,000.00 
6051+020.00     0.00  10.00  0.00  1,300,000.00 
6051+040.00     0.00  10.00  0.00  1,300,000.00 
6051+060.00     0.00  10.00  0.00  1,300,000.00 
6051+080.00     0.00  10.00  0.00  1,300,000.00 
6051+100.00     0.00  10.00  0.00  1,300,000.00 
6051+120.00     0.00  10.00  0.00  1,300,000.00 
6051+140.00     0.00  10.00  0.00  1,300,000.00 
6051+160.00     0.00  10.00  0.00  1,300,000.00 
6051+180.00     0.00  10.00  0.00  1,300,000.00 
6051+200.00     0.00  10.00  0.00  1,300,000.00 
6051+220.00     0.00  10.00  0.00  1,300,000.00 
6051+240.00     0.00  10.00  0.00  1,300,000.00 
6051+260.00     0.00  10.00  0.00  1,300,000.00 
6051+280.00     0.00  10.00  0.00  1,300,000.00 
6051+300.00     0.00  10.00  0.00  1,300,000.00 
6051+320.00     0.00  10.00  0.00  1,300,000.00 
6051+340.00     0.00  10.00  0.00  1,300,000.00 
6051+360.00     0.00  10.00  0.00  1,300,000.00 
6051+380.00     0.00  10.00  0.00  1,300,000.00 
6051+400.00     0.00  10.00  0.00  1,300,000.00 
6051+420.00     0.00  10.00  0.00  1,300,000.00 
6051+440.00     0.00  10.00  0.00  1,300,000.00 

548 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6051+460.00     0.00  10.00  0.00  1,300,000.00 


6051+480.00     0.00  10.00  0.00  1,300,000.00 
6051+500.00     0.00  10.00  0.00  1,300,000.00 
6051+520.00     0.00  10.00  0.00  1,300,000.00 
6051+540.00     0.00  10.00  0.00  1,300,000.00 
6051+560.00     0.00  10.00  0.00  1,300,000.00 
6051+580.00     0.00  10.00  0.00  1,300,000.00 
6051+600.00     0.00  10.00  0.00  1,300,000.00 
6051+620.00     0.00  10.00  0.00  1,300,000.00 
6051+640.00     0.00  10.00  0.00  1,300,000.00 
6051+660.00     0.00  10.00  0.00  1,300,000.00 
6051+680.00     0.00  10.00  0.00  1,300,000.00 
6051+700.00     0.00  10.00  0.00  1,300,000.00 
6051+720.00     0.00  10.00  0.00  1,300,000.00 
6051+740.00     0.00  10.00  0.00  1,300,000.00 
6051+760.00     0.00  10.00  0.00  1,300,000.00 
6051+780.00     0.00  10.00  0.00  1,300,000.00 
6051+800.00     0.00  10.00  0.00  1,300,000.00 
6051+820.00     0.00  10.00  0.00  1,300,000.00 
6051+840.00     0.00  10.00  0.00  1,300,000.00 
6051+860.00     0.00  10.00  0.00  1,300,000.00 
6051+880.00     0.00  10.00  0.00  1,300,000.00 
6051+900.00     0.00  10.00  0.00  1,300,000.00 
6051+920.00     0.00  10.00  0.00  1,300,000.00 
6051+940.00     0.00  10.00  0.00  1,300,000.00 
6051+960.00     0.00  10.00  0.00  1,300,000.00 
6051+980.00     0.00  10.00  0.00  1,300,000.00 
6052+000.00     0.00  10.00  0.00  1,300,000.00 
6052+020.00     0.00  10.00  0.00  1,300,000.00 
6052+040.00     0.00  10.00  0.00  1,300,000.00 
6052+060.00     0.00  10.00  0.00  1,300,000.00 
6052+080.00     0.00  10.00  0.00  1,300,000.00 
6052+100.00     0.00  10.00  0.00  1,300,000.00 
6052+120.00     0.00  10.00  0.00  1,300,000.00 
6052+140.00     0.00  10.00  0.00  1,300,000.00 
6052+160.00     0.00  10.00  0.00  1,300,000.00 
6052+180.00     0.00  10.00  0.00  1,300,000.00 
6052+200.00     0.00  10.00  0.00  1,300,000.00 
6052+220.00     0.00  10.00  0.00  1,300,000.00 
6052+240.00     0.00  10.00  0.00  1,300,000.00 
6052+260.00     0.00  10.00  0.00  1,300,000.00 
6052+280.00     0.00  10.00  0.00  1,300,000.00 
6052+300.00     0.00  10.00  0.00  1,300,000.00 
6052+320.00     0.00  10.00  0.00  1,300,000.00 
6052+340.00     0.00  10.00  0.00  1,300,000.00 
6052+360.00     0.00  10.00  0.00  1,300,000.00 
6052+380.00     0.00  10.00  0.00  1,300,000.00 
6052+400.00     0.00  10.00  0.00  1,300,000.00 
6052+420.00     0.00  10.00  0.00  1,300,000.00 
6052+420.00     0.00  0.00  0.00  1,300,000.00 
6052+440.00     0.00  10.00  0.00  1,300,000.00 

549 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6052+460.00     0.00  10.00  0.00  1,300,000.00 


6052+480.00     0.00  10.00  0.00  1,300,000.00 
6052+490.00     0.00  5.00  0.00  1,300,000.00 
6052+490.00     0.00  0.00  0.00  1,300,000.00 
6052+500.00     0.00  5.00  0.00  1,300,000.00 
6052+520.00     0.00  10.00  0.00  1,300,000.00 
6052+540.00     0.00  10.00  0.00  1,300,000.00 
6052+560.00     0.00  10.00  0.00  1,300,000.00 
6052+580.00     0.00  10.00  0.00  1,300,000.00 
6052+600.00     0.00  10.00  0.00  1,300,000.00 
6052+620.00     0.00  10.00  0.00  1,300,000.00 
6052+640.00     0.00  10.00  0.00  1,300,000.00 
6052+660.00     0.00  10.00  0.00  1,300,000.00 
6052+680.00     0.00  10.00  0.00  1,300,000.00 
6052+700.00     0.00  10.00  0.00  1,300,000.00 
6052+720.00     0.00  10.00  0.00  1,300,000.00 
6052+740.00     0.00  10.00  0.00  1,300,000.00 
6052+760.00     0.00  10.00  0.00  1,300,000.00 
6052+780.00     0.00  10.00  0.00  1,300,000.00 
6052+800.00     0.00  10.00  0.00  1,300,000.00 
6052+820.00     0.00  10.00  0.00  1,300,000.00 
6052+840.00     0.00  10.00  0.00  1,300,000.00 
6052+860.00     0.00  10.00  0.00  1,300,000.00 
6052+880.00     0.00  10.00  0.00  1,300,000.00 
6052+900.00     0.00  10.00  0.00  1,300,000.00 
6052+920.00     0.00  10.00  0.00  1,300,000.00 
6052+940.00     0.00  10.00  0.00  1,300,000.00 
6052+960.00     0.00  10.00  0.00  1,300,000.00 
6052+980.00     0.00  10.00  0.00  1,300,000.00 
6053+000.00     0.00  10.00  0.00  1,300,000.00 
6053+020.00     0.00  10.00  0.00  1,300,000.00 
6053+040.00     0.00  10.00  0.00  1,300,000.00 
6053+060.00     0.00  10.00  0.00  1,300,000.00 
6053+080.00     0.00  10.00  0.00  1,300,000.00 
6053+100.00     0.00  10.00  0.00  1,300,000.00 
6053+120.00     0.00  10.00  0.00  1,300,000.00 
6053+140.00     0.00  10.00  0.00  1,300,000.00 
6053+160.00     0.00  10.00  0.00  1,300,000.00 
6053+180.00     0.00  10.00  0.00  1,300,000.00 
6053+200.00     0.00  10.00  0.00  1,300,000.00 
6053+220.00     0.00  10.00  0.00  1,300,000.00 
6053+240.00     0.00  10.00  0.00  1,300,000.00 
6053+260.00     0.00  10.00  0.00  1,300,000.00 
6053+280.00     0.00  10.00  0.00  1,300,000.00 
6053+300.00     0.00  10.00  0.00  1,300,000.00 
6053+320.00     0.00  10.00  0.00  1,300,000.00 
6053+340.00     0.00  10.00  0.00  1,300,000.00 
6053+360.00     0.00  10.00  0.00  1,300,000.00 
6053+380.00     0.00  10.00  0.00  1,300,000.00 
6053+400.00     0.00  10.00  0.00  1,300,000.00 
6053+420.00     0.00  10.00  0.00  1,300,000.00 

550 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6053+440.00     0.00  10.00  0.00  1,300,000.00 


6053+460.00     0.00  10.00  0.00  1,300,000.00 
6053+480.00     0.00  10.00  0.00  1,300,000.00 
6053+500.00     0.00  10.00  0.00  1,300,000.00 
6053+520.00     0.00  10.00  0.00  1,300,000.00 
6053+540.00     0.00  10.00  0.00  1,300,000.00 
6053+560.00     0.00  10.00  0.00  1,300,000.00 
6053+580.00     0.00  10.00  0.00  1,300,000.00 
6053+600.00     0.00  10.00  0.00  1,300,000.00 
6053+620.00     0.00  10.00  0.00  1,300,000.00 
6053+640.00     0.00  10.00  0.00  1,300,000.00 
6053+660.00     0.00  10.00  0.00  1,300,000.00 
6053+680.00     0.00  10.00  0.00  1,300,000.00 
6053+700.00     0.00  10.00  0.00  1,300,000.00 
6053+720.00     0.00  10.00  0.00  1,300,000.00 
6053+740.00     0.00  10.00  0.00  1,300,000.00 
6053+760.00     0.00  10.00  0.00  1,300,000.00 
6053+780.00     0.00  10.00  0.00  1,300,000.00 
6053+800.00     0.00  10.00  0.00  1,300,000.00 
6053+820.00     0.00  10.00  0.00  1,300,000.00 
6053+840.00     0.00  10.00  0.00  1,300,000.00 
6053+860.00     0.00  10.00  0.00  1,300,000.00 
6053+880.00     0.00  10.00  0.00  1,300,000.00 
6053+900.00     0.00  10.00  0.00  1,300,000.00 
6053+920.00     0.00  10.00  0.00  1,300,000.00 
6053+940.00     0.00  10.00  0.00  1,300,000.00 
6053+960.00     0.00  10.00  0.00  1,300,000.00 
6053+980.00     0.00  10.00  0.00  1,300,000.00 
6054+000.00     0.00  10.00  0.00  1,300,000.00 
6054+020.00     0.00  10.00  0.00  1,300,000.00 
6054+040.00     0.00  10.00  0.00  1,300,000.00 
6054+060.00     0.00  10.00  0.00  1,300,000.00 
6054+080.00     0.00  10.00  0.00  1,300,000.00 
6054+100.00     0.00  10.00  0.00  1,300,000.00 
6054+120.00     0.00  10.00  0.00  1,300,000.00 
6054+140.00     0.00  10.00  0.00  1,300,000.00 
6054+160.00     0.00  10.00  0.00  1,300,000.00 
6054+180.00     0.00  10.00  0.00  1,300,000.00 
6054+200.00     0.00  10.00  0.00  1,300,000.00 
6054+220.00     0.00  10.00  0.00  1,300,000.00 
6054+240.00     0.00  10.00  0.00  1,300,000.00 
6054+260.00     0.00  10.00  0.00  1,300,000.00 
6054+280.00     0.00  10.00  0.00  1,300,000.00 
6054+300.00     0.00  10.00  0.00  1,300,000.00 
6054+320.00     0.00  10.00  0.00  1,300,000.00 
6054+340.00     0.00  10.00  0.00  1,300,000.00 
6054+360.00     0.00  10.00  0.00  1,300,000.00 
6054+380.00     0.00  10.00  0.00  1,300,000.00 
6054+400.00     0.00  10.00  0.00  1,300,000.00 
6054+420.00     0.00  10.00  0.00  1,300,000.00 
6054+440.00     0.00  10.00  0.00  1,300,000.00 

551 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6054+460.00     0.00  10.00  0.00  1,300,000.00 


6054+480.00     0.00  10.00  0.00  1,300,000.00 
6054+500.00     0.00  10.00  0.00  1,300,000.00 
6054+520.00     0.00  10.00  0.00  1,300,000.00 
6054+540.00     0.00  10.00  0.00  1,300,000.00 
6054+560.00     0.00  10.00  0.00  1,300,000.00 
6054+580.00     0.00  10.00  0.00  1,300,000.00 
6054+600.00     0.00  10.00  0.00  1,300,000.00 
6054+620.00     0.00  10.00  0.00  1,300,000.00 
6054+640.00     0.00  10.00  0.00  1,300,000.00 
6054+660.00     0.00  10.00  0.00  1,300,000.00 
6054+680.00     0.00  10.00  0.00  1,300,000.00 
6054+700.00     0.00  10.00  0.00  1,300,000.00 
6054+720.00     0.00  10.00  0.00  1,300,000.00 
6054+740.00     0.00  10.00  0.00  1,300,000.00 
6054+760.00     0.00  10.00  0.00  1,300,000.00 
6054+780.00     0.00  10.00  0.00  1,300,000.00 
6054+800.00     0.00  10.00  0.00  1,300,000.00 
6054+820.00     0.00  10.00  0.00  1,300,000.00 
6054+840.00     0.00  10.00  0.00  1,300,000.00 
6054+860.00     0.00  10.00  0.00  1,300,000.00 
6054+880.00     0.00  10.00  0.00  1,300,000.00 
6054+900.00     0.00  10.00  0.00  1,300,000.00 
6054+920.00     0.00  10.00  0.00  1,300,000.00 
6054+940.00     0.00  10.00  0.00  1,300,000.00 
6054+960.00     0.00  10.00  0.00  1,300,000.00 
6054+980.00     0.00  10.00  0.00  1,300,000.00 
6055+000.00     0.00  10.00  0.00  1,300,000.00 
6055+020.00     0.00  10.00  0.00  1,300,000.00 
6055+040.00     0.00  10.00  0.00  1,300,000.00 
6055+060.00     0.00  10.00  0.00  1,300,000.00 
6055+080.00     0.00  10.00  0.00  1,300,000.00 
6055+100.00     0.00  10.00  0.00  1,300,000.00 
6055+120.00     0.00  10.00  0.00  1,300,000.00 
6055+140.00     0.00  10.00  0.00  1,300,000.00 
6055+160.00     0.00  10.00  0.00  1,300,000.00 
6055+180.00     0.00  10.00  0.00  1,300,000.00 
6055+200.00     0.00  10.00  0.00  1,300,000.00 
6055+220.00     0.00  10.00  0.00  1,300,000.00 
6055+240.00     0.00  10.00  0.00  1,300,000.00 
6055+260.00     0.00  10.00  0.00  1,300,000.00 
6055+280.00     0.00  10.00  0.00  1,300,000.00 
6055+300.00     0.00  10.00  0.00  1,300,000.00 
6055+320.00     0.00  10.00  0.00  1,300,000.00 
6055+340.00     0.00  10.00  0.00  1,300,000.00 
6055+360.00     0.00  10.00  0.00  1,300,000.00 
6055+380.00     0.00  10.00  0.00  1,300,000.00 
6055+400.00     0.00  10.00  0.00  1,300,000.00 
6055+420.00     0.00  10.00  0.00  1,300,000.00 
6055+440.00     0.00  10.00  0.00  1,300,000.00 
6055+460.00     0.00  10.00  0.00  1,300,000.00 

552 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6055+480.00     0.00  10.00  0.00  1,300,000.00 


6055+500.00     0.00  10.00  0.00  1,300,000.00 
6055+520.00     0.00  10.00  0.00  1,300,000.00 
6055+540.00     0.00  10.00  0.00  1,300,000.00 
6055+560.00     0.00  10.00  0.00  1,300,000.00 
6055+580.00     0.00  10.00  0.00  1,300,000.00 
6055+600.00     0.00  10.00  0.00  1,300,000.00 
6055+620.00     0.00  10.00  0.00  1,300,000.00 
6055+640.00     0.00  10.00  0.00  1,300,000.00 
6055+660.00     0.00  10.00  0.00  1,300,000.00 
6055+680.00     0.00  10.00  0.00  1,300,000.00 
6055+700.00     0.00  10.00  0.00  1,300,000.00 
6055+720.00     0.00  10.00  0.00  1,300,000.00 
6055+740.00     0.00  10.00  0.00  1,300,000.00 
6055+760.00     0.00  10.00  0.00  1,300,000.00 
6055+780.00     0.00  10.00  0.00  1,300,000.00 
6055+800.00     0.00  10.00  0.00  1,300,000.00 
6055+820.00     0.00  10.00  0.00  1,300,000.00 
6055+840.00     0.00  10.00  0.00  1,300,000.00 
6055+860.00     0.00  10.00  0.00  1,300,000.00 
6055+880.00     0.00  10.00  0.00  1,300,000.00 
6055+900.00     0.00  10.00  0.00  1,300,000.00 
6055+920.00     0.00  10.00  0.00  1,300,000.00 
6055+940.00     0.00  10.00  0.00  1,300,000.00 
6055+960.00     0.00  10.00  0.00  1,300,000.00 
6055+980.00     0.00  10.00  0.00  1,300,000.00 
6056+000.00     0.00  10.00  0.00  1,300,000.00 
6056+020.00     0.00  10.00  0.00  1,300,000.00 
6056+040.00     0.00  10.00  0.00  1,300,000.00 
6056+060.00     0.00  10.00  0.00  1,300,000.00 
6056+080.00     0.00  10.00  0.00  1,300,000.00 
6056+100.00     0.00  10.00  0.00  1,300,000.00 
6056+120.00     0.00  10.00  0.00  1,300,000.00 
6056+140.00     0.00  10.00  0.00  1,300,000.00 
6056+160.00     0.00  10.00  0.00  1,300,000.00 
6056+170.00     0.00  5.00  0.00  1,300,000.00 
6056+170.00     0.00  0.00  0.00  1,300,000.00 
6056+180.00     0.00  5.00  0.00  1,300,000.00 
6056+200.00     0.00  10.00  0.00  1,300,000.00 
6056+220.00     0.00  10.00  0.00  1,300,000.00 
6056+240.00     0.00  10.00  0.00  1,300,000.00 
6056+260.00     0.00  10.00  0.00  1,300,000.00 
6056+280.00     0.00  10.00  0.00  1,300,000.00 
6056+300.00     0.00  10.00  0.00  1,300,000.00 
6056+300.00     0.00  0.00  0.00  1,300,000.00 
6056+320.00     0.00  10.00  0.00  1,300,000.00 
6056+340.00     0.00  10.00  0.00  1,300,000.00 
6056+360.00     0.00  10.00  0.00  1,300,000.00 
6056+380.00     0.00  10.00  0.00  1,300,000.00 
6056+400.00     0.00  10.00  0.00  1,300,000.00 
6056+420.00     0.00  10.00  0.00  1,300,000.00 

553 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6056+440.00     0.00  10.00  0.00  1,300,000.00 


6056+460.00     0.00  10.00  0.00  1,300,000.00 
6056+480.00     0.00  10.00  0.00  1,300,000.00 
6056+500.00     0.00  10.00  0.00  1,300,000.00 
6056+520.00     0.00  10.00  0.00  1,300,000.00 
6056+540.00     0.00  10.00  0.00  1,300,000.00 
6056+560.00     0.00  10.00  0.00  1,300,000.00 
6056+580.00     0.00  10.00  0.00  1,300,000.00 
6056+600.00     0.00  10.00  0.00  1,300,000.00 
6056+614.06     0.00  7.03  0.00  1,300,000.00 
6056+620.00     0.00  2.97  0.00  1,300,000.00 
6056+640.00     0.00  10.00  0.00  1,300,000.00 
6056+644.06     0.00  2.03  0.00  1,300,000.00 
6056+660.00     0.00  7.97  0.00  1,300,000.00 
6056+680.00     0.00  10.00  0.00  1,300,000.00 
6056+700.00     0.00  10.00  0.00  1,300,000.00 
6056+720.00     0.00  10.00  0.00  1,300,000.00 
6056+734.82     0.00  7.41  0.00  1,300,000.00 
6056+740.00     0.00  2.59  0.00  1,300,000.00 
6056+760.00     0.00  10.00  0.00  1,300,000.00 
6056+764.82     0.00  2.41  0.00  1,300,000.00 
6056+770.00     0.00  2.59  0.00  1,300,000.00 
6056+770.00     0.00  0.00  0.00  1,300,000.00 
6056+780.00     0.00  5.00  0.00  1,300,000.00 
6056+800.00     0.00  10.00  0.00  1,300,000.00 
6056+820.00     0.00  10.00  0.00  1,300,000.00 
6056+840.00     0.00  10.00  0.00  1,300,000.00 
6056+860.00     0.00  10.00  0.00  1,300,000.00 
6056+860.00     0.00  0.00  0.00  1,300,000.00 
6056+880.00     0.00  10.00  0.00  1,300,000.00 
6056+900.00     0.00  10.00  0.00  1,300,000.00 
6056+920.00     0.00  10.00  0.00  1,300,000.00 
6056+940.00     0.00  10.00  0.00  1,300,000.00 
6056+960.00     0.00  10.00  0.00  1,300,000.00 
6056+980.00     0.00  10.00  0.00  1,300,000.00 
6057+000.00     0.00  10.00  0.00  1,300,000.00 
6057+020.00     0.00  10.00  0.00  1,300,000.00 
6057+040.00     0.00  10.00  0.00  1,300,000.00 
6057+060.00     0.00  10.00  0.00  1,300,000.00 
6057+080.00     0.00  10.00  0.00  1,300,000.00 
6057+100.00     0.00  10.00  0.00  1,300,000.00 
6057+120.00     0.00  10.00  0.00  1,300,000.00 
6057+140.00     0.00  10.00  0.00  1,300,000.00 
6057+160.00     0.00  10.00  0.00  1,300,000.00 
6057+180.00     0.00  10.00  0.00  1,300,000.00 
6057+200.00     0.00  10.00  0.00  1,300,000.00 
6057+220.00     0.00  10.00  0.00  1,300,000.00 
6057+240.00     0.00  10.00  0.00  1,300,000.00 
6057+260.00     0.00  10.00  0.00  1,300,000.00 
6057+270.00     0.00  5.00  0.00  1,300,000.00 
6057+270.00     0.00  0.00  0.00  1,300,000.00 

554 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6057+280.00     0.00  5.00  0.00  1,300,000.00 


6057+300.00     0.00  10.00  0.00  1,300,000.00 
6057+320.00     0.00  10.00  0.00  1,300,000.00 
6057+340.00     0.00  10.00  0.00  1,300,000.00 
6057+340.00     0.00  0.00  0.00  1,300,000.00 
6057+360.00     0.00  10.00  0.00  1,300,000.00 
6057+380.00     0.00  10.00  0.00  1,300,000.00 
6057+400.00     0.00  10.00  0.00  1,300,000.00 
6057+420.00     0.00  10.00  0.00  1,300,000.00 
6057+440.00     0.00  10.00  0.00  1,300,000.00 
6057+460.00     0.00  10.00  0.00  1,300,000.00 
6057+480.00     0.00  10.00  0.00  1,300,000.00 
6057+500.00     0.00  10.00  0.00  1,300,000.00 
6057+520.00     0.00  10.00  0.00  1,300,000.00 
6057+540.00     0.00  10.00  0.00  1,300,000.00 
6057+560.00     0.00  10.00  0.00  1,300,000.00 
6057+580.00     0.00  10.00  0.00  1,300,000.00 
6057+600.00     0.00  10.00  0.00  1,300,000.00 
6057+620.00     0.00  10.00  0.00  1,300,000.00 
6057+640.00     0.00  10.00  0.00  1,300,000.00 
6057+660.00     0.00  10.00  0.00  1,300,000.00 
6057+680.00     0.00  10.00  0.00  1,300,000.00 
6057+700.00     0.00  10.00  0.00  1,300,000.00 
6057+720.00     0.00  10.00  0.00  1,300,000.00 
6057+740.00     0.00  10.00  0.00  1,300,000.00 
6057+760.00     0.00  10.00  0.00  1,300,000.00 
6057+780.00     0.00  10.00  0.00  1,300,000.00 
6057+800.00     0.00  10.00  0.00  1,300,000.00 
6057+820.00     0.00  10.00  0.00  1,300,000.00 
6057+840.00     0.00  10.00  0.00  1,300,000.00 
6057+860.00     0.00  10.00  0.00  1,300,000.00 
6057+880.00     0.00  10.00  0.00  1,300,000.00 
6057+900.00     0.00  10.00  0.00  1,300,000.00 
6057+920.00     0.00  10.00  0.00  1,300,000.00 
6057+940.00     0.00  10.00  0.00  1,300,000.00 
6057+960.00     0.00  10.00  0.00  1,300,000.00 
6057+980.00     0.00  10.00  0.00  1,300,000.00 
6058+000.00     0.00  10.00  0.00  1,300,000.00 
6058+020.00     0.00  10.00  0.00  1,300,000.00 
6058+040.00     0.00  10.00  0.00  1,300,000.00 
6058+060.00     0.00  10.00  0.00  1,300,000.00 
6058+080.00     0.00  10.00  0.00  1,300,000.00 
6058+100.00     0.00  10.00  0.00  1,300,000.00 
6058+120.00     0.00  10.00  0.00  1,300,000.00 
6058+140.00     0.00  10.00  0.00  1,300,000.00 
6058+160.00     0.00  10.00  0.00  1,300,000.00 
6058+180.00     0.00  10.00  0.00  1,300,000.00 
6058+200.00     0.00  10.00  0.00  1,300,000.00 
6058+220.00     0.00  10.00  0.00  1,300,000.00 
6058+240.00     0.00  10.00  0.00  1,300,000.00 
6058+260.00     0.00  10.00  0.00  1,300,000.00 

555 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6058+280.00     0.00  10.00  0.00  1,300,000.00 


6058+300.00     0.00  10.00  0.00  1,300,000.00 
6058+320.00     0.00  10.00  0.00  1,300,000.00 
6058+340.00     0.00  10.00  0.00  1,300,000.00 
6058+360.00     0.00  10.00  0.00  1,300,000.00 
6058+380.00     0.00  10.00  0.00  1,300,000.00 
6058+400.00     0.00  10.00  0.00  1,300,000.00 
6058+420.00     0.00  10.00  0.00  1,300,000.00 
6058+440.00     0.00  10.00  0.00  1,300,000.00 
6058+460.00     0.00  10.00  0.00  1,300,000.00 
6058+480.00     0.00  10.00  0.00  1,300,000.00 
6058+500.00     0.00  10.00  0.00  1,300,000.00 
6058+520.00     0.00  10.00  0.00  1,300,000.00 
6058+540.00     0.00  10.00  0.00  1,300,000.00 
6058+560.00     0.00  10.00  0.00  1,300,000.00 
6058+580.00     0.00  10.00  0.00  1,300,000.00 
6058+600.00     0.00  10.00  0.00  1,300,000.00 
6058+620.00     0.00  10.00  0.00  1,300,000.00 
6058+640.00     0.00  10.00  0.00  1,300,000.00 
6058+660.00     0.00  10.00  0.00  1,300,000.00 
6058+680.00     0.00  10.00  0.00  1,300,000.00 
6058+700.00     0.00  10.00  0.00  1,300,000.00 
6058+720.00     0.00  10.00  0.00  1,300,000.00 
6058+740.00     0.00  10.00  0.00  1,300,000.00 
6058+760.00     0.00  10.00  0.00  1,300,000.00 
6058+780.00     0.00  10.00  0.00  1,300,000.00 
6058+800.00     0.00  10.00  0.00  1,300,000.00 
6058+820.00     0.00  10.00  0.00  1,300,000.00 
6058+840.00     0.00  10.00  0.00  1,300,000.00 
6058+860.00     0.00  10.00  0.00  1,300,000.00 
6058+880.00     0.00  10.00  0.00  1,300,000.00 
6058+900.00     0.00  10.00  0.00  1,300,000.00 
6058+920.00     0.00  10.00  0.00  1,300,000.00 
6058+940.00     0.00  10.00  0.00  1,300,000.00 
6058+960.00     0.00  10.00  0.00  1,300,000.00 
6058+980.00     0.00  10.00  0.00  1,300,000.00 
6059+000.00     0.00  10.00  0.00  1,300,000.00 
6059+020.00     0.00  10.00  0.00  1,300,000.00 
6059+040.00     0.00  10.00  0.00  1,300,000.00 
6059+060.00     0.00  10.00  0.00  1,300,000.00 
6059+080.00     0.00  10.00  0.00  1,300,000.00 
6059+100.00     0.00  10.00  0.00  1,300,000.00 
6059+120.00     0.00  10.00  0.00  1,300,000.00 
6059+140.00     0.00  10.00  0.00  1,300,000.00 
6059+160.00     0.00  10.00  0.00  1,300,000.00 
6059+180.00     0.00  10.00  0.00  1,300,000.00 
6059+200.00     0.00  10.00  0.00  1,300,000.00 
6059+220.00     0.00  10.00  0.00  1,300,000.00 
6059+240.00     0.00  10.00  0.00  1,300,000.00 
6059+260.00     0.00  10.00  0.00  1,300,000.00 
6059+280.00     0.00  10.00  0.00  1,300,000.00 

556 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6059+300.00     0.00  10.00  0.00  1,300,000.00 


6059+320.00     0.00  10.00  0.00  1,300,000.00 
6059+340.00     0.00  10.00  0.00  1,300,000.00 
6059+360.00     0.00  10.00  0.00  1,300,000.00 
6059+380.00     0.00  10.00  0.00  1,300,000.00 
6059+400.00     0.00  10.00  0.00  1,300,000.00 
6059+420.00     0.00  10.00  0.00  1,300,000.00 
6059+440.00     0.00  10.00  0.00  1,300,000.00 
6059+460.00     0.00  10.00  0.00  1,300,000.00 
6059+480.00     0.00  10.00  0.00  1,300,000.00 
6059+500.00     0.00  10.00  0.00  1,300,000.00 
6059+520.00     0.00  10.00  0.00  1,300,000.00 
6059+540.00     0.00  10.00  0.00  1,300,000.00 
6059+560.00     0.00  10.00  0.00  1,300,000.00 
6059+580.00     0.00  10.00  0.00  1,300,000.00 
6059+600.00     0.00  10.00  0.00  1,300,000.00 
6059+620.00     0.00  10.00  0.00  1,300,000.00 
6059+640.00     0.00  10.00  0.00  1,300,000.00 
6059+660.00     0.00  10.00  0.00  1,300,000.00 
6059+680.00     0.00  10.00  0.00  1,300,000.00 
6059+700.00     0.00  10.00  0.00  1,300,000.00 
6059+720.00     0.00  10.00  0.00  1,300,000.00 
6059+740.00     0.00  10.00  0.00  1,300,000.00 
6059+760.00     0.00  10.00  0.00  1,300,000.00 
6059+780.00     0.00  10.00  0.00  1,300,000.00 
6059+800.00     0.00  10.00  0.00  1,300,000.00 
6059+820.00     0.00  10.00  0.00  1,300,000.00 
6059+840.00     0.00  10.00  0.00  1,300,000.00 
6059+860.00     0.00  10.00  0.00  1,300,000.00 
6059+880.00     0.00  10.00  0.00  1,300,000.00 
6059+900.00     0.00  10.00  0.00  1,300,000.00 
6059+920.00     0.00  10.00  0.00  1,300,000.00 
6059+940.00     0.00  10.00  0.00  1,300,000.00 
6059+960.00     0.00  10.00  0.00  1,300,000.00 
6059+980.00     0.00  10.00  0.00  1,300,000.00 
6060+000.00     0.00  10.00  0.00  1,300,000.00 
6060+020.00     0.00  10.00  0.00  1,300,000.00 
6060+040.00     0.00  10.00  0.00  1,300,000.00 
6060+060.00     0.00  10.00  0.00  1,300,000.00 
6060+080.00     0.00  10.00  0.00  1,300,000.00 
6060+100.00     0.00  10.00  0.00  1,300,000.00 
6060+120.00     0.00  10.00  0.00  1,300,000.00 
6060+140.00     0.00  10.00  0.00  1,300,000.00 
6060+160.00     0.00  10.00  0.00  1,300,000.00 
6060+180.00     0.00  10.00  0.00  1,300,000.00 
6060+200.00     0.00  10.00  0.00  1,300,000.00 
6060+220.00     0.00  10.00  0.00  1,300,000.00 
6060+240.00     0.00  10.00  0.00  1,300,000.00 
6060+260.00     0.00  10.00  0.00  1,300,000.00 
6060+280.00     0.00  10.00  0.00  1,300,000.00 
6060+300.00     0.00  10.00  0.00  1,300,000.00 

557 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6060+320.00     0.00  10.00  0.00  1,300,000.00 


6060+340.00     0.00  10.00  0.00  1,300,000.00 
6060+360.00     0.00  10.00  0.00  1,300,000.00 
6060+380.00     0.00  10.00  0.00  1,300,000.00 
6060+400.00     0.00  10.00  0.00  1,300,000.00 
6060+420.00     0.00  10.00  0.00  1,300,000.00 
6060+440.00     0.00  10.00  0.00  1,300,000.00 
6060+460.00     0.00  10.00  0.00  1,300,000.00 
6060+480.00     0.00  10.00  0.00  1,300,000.00 
6060+500.00     0.00  10.00  0.00  1,300,000.00 
6060+520.00     0.00  10.00  0.00  1,300,000.00 
6060+540.00     0.00  10.00  0.00  1,300,000.00 
6060+560.00     0.00  10.00  0.00  1,300,000.00 
6060+580.00     0.00  10.00  0.00  1,300,000.00 
6060+600.00     0.00  10.00  0.00  1,300,000.00 
6060+620.00     0.00  10.00  0.00  1,300,000.00 
6060+640.00     0.00  10.00  0.00  1,300,000.00 
6060+660.00     0.00  10.00  0.00  1,300,000.00 
6060+680.00     0.00  10.00  0.00  1,300,000.00 
6060+700.00     0.00  10.00  0.00  1,300,000.00 
6060+720.00     0.00  10.00  0.00  1,300,000.00 
6060+740.00     0.00  10.00  0.00  1,300,000.00 
6060+760.00     0.00  10.00  0.00  1,300,000.00 
6060+780.00     0.00  10.00  0.00  1,300,000.00 
6060+800.00     0.00  10.00  0.00  1,300,000.00 
6060+820.00     0.00  10.00  0.00  1,300,000.00 
6060+840.00     0.00  10.00  0.00  1,300,000.00 
6060+860.00     0.00  10.00  0.00  1,300,000.00 
6060+880.00     0.00  10.00  0.00  1,300,000.00 
6060+900.00     0.00  10.00  0.00  1,300,000.00 
6060+920.00     0.00  10.00  0.00  1,300,000.00 
6060+940.00     0.00  10.00  0.00  1,300,000.00 
6060+960.00     0.00  10.00  0.00  1,300,000.00 
6060+980.00     0.00  10.00  0.00  1,300,000.00 
6061+000.00     0.00  10.00  0.00  1,300,000.00 
6061+020.00     0.00  10.00  0.00  1,300,000.00 
6061+040.00     0.00  10.00  0.00  1,300,000.00 
6061+060.00     0.00  10.00  0.00  1,300,000.00 
6061+080.00     0.00  10.00  0.00  1,300,000.00 
6061+100.00     0.00  10.00  0.00  1,300,000.00 
6061+120.00     0.00  10.00  0.00  1,300,000.00 
6061+140.00     0.00  10.00  0.00  1,300,000.00 
6061+160.00     0.00  10.00  0.00  1,300,000.00 
6061+180.00     0.00  10.00  0.00  1,300,000.00 
6061+200.00     0.00  10.00  0.00  1,300,000.00 
6061+220.00     0.00  10.00  0.00  1,300,000.00 
6061+240.00     0.00  10.00  0.00  1,300,000.00 
6061+260.00     0.00  10.00  0.00  1,300,000.00 
6061+280.00     0.00  10.00  0.00  1,300,000.00 
6061+300.00     0.00  10.00  0.00  1,300,000.00 
6061+320.00     0.00  10.00  0.00  1,300,000.00 

558 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6061+340.00     0.00  10.00  0.00  1,300,000.00 


6061+360.00     0.00  10.00  0.00  1,300,000.00 
6061+380.00     0.00  10.00  0.00  1,300,000.00 
6061+400.00     0.00  10.00  0.00  1,300,000.00 
6061+420.00     0.00  10.00  0.00  1,300,000.00 
6061+440.00     0.00  10.00  0.00  1,300,000.00 
6061+460.00     0.00  10.00  0.00  1,300,000.00 
6061+480.00     0.00  10.00  0.00  1,300,000.00 
6061+500.00     0.00  10.00  0.00  1,300,000.00 
6061+520.00     0.00  10.00  0.00  1,300,000.00 
6061+540.00     0.00  10.00  0.00  1,300,000.00 
6061+560.00     0.00  10.00  0.00  1,300,000.00 
6061+580.00     0.00  10.00  0.00  1,300,000.00 
6061+600.00     0.00  10.00  0.00  1,300,000.00 
6061+620.00     0.00  10.00  0.00  1,300,000.00 
6061+640.00     0.00  10.00  0.00  1,300,000.00 
6061+660.00     0.00  10.00  0.00  1,300,000.00 
6061+680.00     0.00  10.00  0.00  1,300,000.00 
6061+700.00     0.00  10.00  0.00  1,300,000.00 
6061+720.00     0.00  10.00  0.00  1,300,000.00 
6061+740.00     0.00  10.00  0.00  1,300,000.00 
6061+760.00     0.00  10.00  0.00  1,300,000.00 
6061+780.00     0.00  10.00  0.00  1,300,000.00 
6061+800.00     0.00  10.00  0.00  1,300,000.00 
6061+820.00     0.00  10.00  0.00  1,300,000.00 
6061+840.00     0.00  10.00  0.00  1,300,000.00 
6061+860.00     0.00  10.00  0.00  1,300,000.00 
6061+880.00     0.00  10.00  0.00  1,300,000.00 
6061+900.00     0.00  10.00  0.00  1,300,000.00 
6061+920.00     0.00  10.00  0.00  1,300,000.00 
6061+940.00     0.00  10.00  0.00  1,300,000.00 
6061+960.00     0.00  10.00  0.00  1,300,000.00 
6061+980.00     0.00  10.00  0.00  1,300,000.00 
6062+000.00     0.00  10.00  0.00  1,300,000.00 
6062+020.00     0.00  10.00  0.00  1,300,000.00 
6062+040.00     0.00  10.00  0.00  1,300,000.00 
6062+060.00     0.00  10.00  0.00  1,300,000.00 
6062+080.00     0.00  10.00  0.00  1,300,000.00 
6062+100.00     0.00  10.00  0.00  1,300,000.00 
6062+120.00     0.00  10.00  0.00  1,300,000.00 
6062+140.00     0.00  10.00  0.00  1,300,000.00 
6062+160.00     0.00  10.00  0.00  1,300,000.00 
6062+180.00     0.00  10.00  0.00  1,300,000.00 
6062+200.00     0.00  10.00  0.00  1,300,000.00 
6062+220.00     0.00  10.00  0.00  1,300,000.00 
6062+240.00     0.00  10.00  0.00  1,300,000.00 
6062+260.00     0.00  10.00  0.00  1,300,000.00 
6062+280.00     0.00  10.00  0.00  1,300,000.00 
6062+300.00     0.00  10.00  0.00  1,300,000.00 
6062+320.00     0.00  10.00  0.00  1,300,000.00 
6062+340.00     0.00  10.00  0.00  1,300,000.00 

559 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6062+360.00     0.00  10.00  0.00  1,300,000.00 


6062+380.00     0.00  10.00  0.00  1,300,000.00 
6062+400.00     0.00  10.00  0.00  1,300,000.00 
6062+420.00     0.00  10.00  0.00  1,300,000.00 
6062+440.00     0.00  10.00  0.00  1,300,000.00 
6062+460.00     0.00  10.00  0.00  1,300,000.00 
6062+480.00     0.00  10.00  0.00  1,300,000.00 
6062+500.00     0.00  10.00  0.00  1,300,000.00 
6062+520.00     0.00  10.00  0.00  1,300,000.00 
6062+540.00     0.00  10.00  0.00  1,300,000.00 
6062+560.00     0.00  10.00  0.00  1,300,000.00 
6062+580.00     0.00  10.00  0.00  1,300,000.00 
6062+600.00     0.00  10.00  0.00  1,300,000.00 
6062+620.00     0.00  10.00  0.00  1,300,000.00 
6062+640.00     0.00  10.00  0.00  1,300,000.00 
6062+660.00     0.00  10.00  0.00  1,300,000.00 
6062+680.00     0.00  10.00  0.00  1,300,000.00 
6062+700.00     0.00  10.00  0.00  1,300,000.00 
6062+720.00     0.00  10.00  0.00  1,300,000.00 
6062+740.00     0.00  10.00  0.00  1,300,000.00 
6062+760.00     0.00  10.00  0.00  1,300,000.00 
6062+780.00     0.00  10.00  0.00  1,300,000.00 
6062+800.00     0.00  10.00  0.00  1,300,000.00 
6062+820.00     0.00  10.00  0.00  1,300,000.00 
6062+840.00     0.00  10.00  0.00  1,300,000.00 
6062+860.00     0.00  10.00  0.00  1,300,000.00 
6062+880.00     0.00  10.00  0.00  1,300,000.00 
6062+900.00     0.00  10.00  0.00  1,300,000.00 
6062+920.00     0.00  10.00  0.00  1,300,000.00 
6062+940.00     0.00  10.00  0.00  1,300,000.00 
6062+960.00     0.00  10.00  0.00  1,300,000.00 
6062+980.00     0.00  10.00  0.00  1,300,000.00 
6063+000.00     0.00  10.00  0.00  1,300,000.00 
6063+020.00     0.00  10.00  0.00  1,300,000.00 
6063+040.00     0.00  10.00  0.00  1,300,000.00 
6063+060.00     0.00  10.00  0.00  1,300,000.00 
6063+080.00     0.00  10.00  0.00  1,300,000.00 
6063+100.00     0.00  10.00  0.00  1,300,000.00 
6063+120.00     0.00  10.00  0.00  1,300,000.00 
6063+140.00     0.00  10.00  0.00  1,300,000.00 
6063+160.00     0.00  10.00  0.00  1,300,000.00 
6063+180.00     0.00  10.00  0.00  1,300,000.00 
6063+200.00     0.00  10.00  0.00  1,300,000.00 
6063+220.00     0.00  10.00  0.00  1,300,000.00 
6063+240.00     0.00  10.00  0.00  1,300,000.00 
6063+260.00     0.00  10.00  0.00  1,300,000.00 
6063+280.00     0.00  10.00  0.00  1,300,000.00 
6063+300.00     0.00  10.00  0.00  1,300,000.00 
6063+320.00     0.00  10.00  0.00  1,300,000.00 
6063+340.00     0.00  10.00  0.00  1,300,000.00 
6063+360.00     0.00  10.00  0.00  1,300,000.00 

560 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6063+380.00     0.00  10.00  0.00  1,300,000.00 


6063+400.00     0.00  10.00  0.00  1,300,000.00 
6063+420.00     0.00  10.00  0.00  1,300,000.00 
6063+440.00     0.00  10.00  0.00  1,300,000.00 
6063+460.00     0.00  10.00  0.00  1,300,000.00 
6063+480.00     0.00  10.00  0.00  1,300,000.00 
6063+500.00     0.00  10.00  0.00  1,300,000.00 
6063+520.00     0.00  10.00  0.00  1,300,000.00 
6063+540.00     0.00  10.00  0.00  1,300,000.00 
6063+560.00     0.00  10.00  0.00  1,300,000.00 
6063+580.00     0.00  10.00  0.00  1,300,000.00 
6063+600.00     0.00  10.00  0.00  1,300,000.00 
6063+620.00     0.00  10.00  0.00  1,300,000.00 
6063+640.00     0.00  10.00  0.00  1,300,000.00 
6063+660.00     0.00  10.00  0.00  1,300,000.00 
6063+680.00     0.00  10.00  0.00  1,300,000.00 
6063+700.00     0.00  10.00  0.00  1,300,000.00 
6063+720.00     0.00  10.00  0.00  1,300,000.00 
6063+740.00     0.00  10.00  0.00  1,300,000.00 
6063+760.00     0.00  10.00  0.00  1,300,000.00 
6063+780.00     0.00  10.00  0.00  1,300,000.00 
6063+800.00     0.00  10.00  0.00  1,300,000.00 
6063+820.00     0.00  10.00  0.00  1,300,000.00 
6063+840.00     0.00  10.00  0.00  1,300,000.00 
6063+860.00     0.00  10.00  0.00  1,300,000.00 
6063+880.00     0.00  10.00  0.00  1,300,000.00 
6063+900.00     0.00  10.00  0.00  1,300,000.00 
6063+920.00     0.00  10.00  0.00  1,300,000.00 
6063+940.00     0.00  10.00  0.00  1,300,000.00 
6063+960.00     0.00  10.00  0.00  1,300,000.00 
6063+980.00     0.00  10.00  0.00  1,300,000.00 
6064+000.00     0.00  10.00  0.00  1,300,000.00 
6064+020.00     0.00  10.00  0.00  1,300,000.00 
6064+040.00     0.00  10.00  0.00  1,300,000.00 
6064+060.00     0.00  10.00  0.00  1,300,000.00 
6064+080.00     0.00  10.00  0.00  1,300,000.00 
6064+100.00     0.00  10.00  0.00  1,300,000.00 
6064+120.00     0.00  10.00  0.00  1,300,000.00 
6064+140.00     0.00  10.00  0.00  1,300,000.00 
6064+160.00     0.00  10.00  0.00  1,300,000.00 
6064+180.00     0.00  10.00  0.00  1,300,000.00 
6064+200.00     0.00  10.00  0.00  1,300,000.00 
6064+220.00     0.00  10.00  0.00  1,300,000.00 
6064+240.00     0.00  10.00  0.00  1,300,000.00 
6064+260.00     0.00  10.00  0.00  1,300,000.00 
6064+280.00     0.00  10.00  0.00  1,300,000.00 
6064+300.00     0.00  10.00  0.00  1,300,000.00 
6064+320.00     0.00  10.00  0.00  1,300,000.00 
6064+340.00     0.00  10.00  0.00  1,300,000.00 
6064+360.00     0.00  10.00  0.00  1,300,000.00 
6064+380.00     0.00  10.00  0.00  1,300,000.00 

561 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6064+400.00     0.00  10.00  0.00  1,300,000.00 


6064+420.00     0.00  10.00  0.00  1,300,000.00 
6064+440.00     0.00  10.00  0.00  1,300,000.00 
6064+460.00     0.00  10.00  0.00  1,300,000.00 
6064+480.00     0.00  10.00  0.00  1,300,000.00 
6064+500.00     0.00  10.00  0.00  1,300,000.00 
6064+520.00     0.00  10.00  0.00  1,300,000.00 
6064+540.00     0.00  10.00  0.00  1,300,000.00 
6064+560.00     0.00  10.00  0.00  1,300,000.00 
6064+580.00     0.00  10.00  0.00  1,300,000.00 
6064+600.00     0.00  10.00  0.00  1,300,000.00 
6064+620.00     0.00  10.00  0.00  1,300,000.00 
6064+640.00     0.00  10.00  0.00  1,300,000.00 
6064+660.00     0.00  10.00  0.00  1,300,000.00 
6064+680.00     0.00  10.00  0.00  1,300,000.00 
6064+700.00     0.00  10.00  0.00  1,300,000.00 
6064+720.00     0.00  10.00  0.00  1,300,000.00 
6064+740.00     0.00  10.00  0.00  1,300,000.00 
6064+760.00     0.00  10.00  0.00  1,300,000.00 
6064+780.00     0.00  10.00  0.00  1,300,000.00 
6064+800.00     0.00  10.00  0.00  1,300,000.00 
6064+820.00     0.00  10.00  0.00  1,300,000.00 
6064+840.00     0.00  10.00  0.00  1,300,000.00 
6064+860.00     0.00  10.00  0.00  1,300,000.00 
6064+880.00     0.00  10.00  0.00  1,300,000.00 
6064+900.00     0.00  10.00  0.00  1,300,000.00 
6064+920.00     0.00  10.00  0.00  1,300,000.00 
6064+940.00     0.00  10.00  0.00  1,300,000.00 
6064+960.00     0.00  10.00  0.00  1,300,000.00 
6064+980.00     0.00  10.00  0.00  1,300,000.00 
6065+000.00     0.00  10.00  0.00  1,300,000.00 
6065+020.00     0.00  10.00  0.00  1,300,000.00 
6065+040.00     0.00  10.00  0.00  1,300,000.00 
6065+060.00     0.00  10.00  0.00  1,300,000.00 
6065+080.00     0.00  10.00  0.00  1,300,000.00 
6065+100.00     0.00  10.00  0.00  1,300,000.00 
6065+120.00     0.00  10.00  0.00  1,300,000.00 
6065+140.00     0.00  10.00  0.00  1,300,000.00 
6065+160.00     0.00  10.00  0.00  1,300,000.00 
6065+180.00     0.00  10.00  0.00  1,300,000.00 
6065+200.00     0.00  10.00  0.00  1,300,000.00 
6065+220.00     0.00  10.00  0.00  1,300,000.00 
6065+240.00     0.00  10.00  0.00  1,300,000.00 
6065+260.00     0.00  10.00  0.00  1,300,000.00 
6065+280.00     0.00  10.00  0.00  1,300,000.00 
6065+300.00     0.00  10.00  0.00  1,300,000.00 
6065+320.00     0.00  10.00  0.00  1,300,000.00 
6065+340.00     0.00  10.00  0.00  1,300,000.00 
6065+360.00     0.00  10.00  0.00  1,300,000.00 
6065+380.00     0.00  10.00  0.00  1,300,000.00 
6065+400.00     0.00  10.00  0.00  1,300,000.00 

562 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6065+420.00     0.00  10.00  0.00  1,300,000.00 


6065+440.00     0.00  10.00  0.00  1,300,000.00 
6065+460.00     0.00  10.00  0.00  1,300,000.00 
6065+480.00     0.00  10.00  0.00  1,300,000.00 
6065+500.00     0.00  10.00  0.00  1,300,000.00 
6065+520.00     0.00  10.00  0.00  1,300,000.00 
6065+540.00     0.00  10.00  0.00  1,300,000.00 
6065+560.00     0.00  10.00  0.00  1,300,000.00 
6065+560.00     0.00  0.00  0.00  1,300,000.00 
6065+580.00     0.00  10.00  0.00  1,300,000.00 
6065+600.00     0.00  10.00  0.00  1,300,000.00 
6065+620.00     0.00  10.00  0.00  1,300,000.00 
6065+640.00     0.00  10.00  0.00  1,300,000.00 
6065+660.00     0.00  10.00  0.00  1,300,000.00 
6065+680.00     0.00  10.00  0.00  1,300,000.00 
6065+700.00     0.00  10.00  0.00  1,300,000.00 
6065+710.00     0.00  5.00  0.00  1,300,000.00 
6065+710.00     0.00  0.00  0.00  1,300,000.00 
6065+720.00     0.00  5.00  0.00  1,300,000.00 
6065+740.00     0.00  10.00  0.00  1,300,000.00 
6065+760.00     0.00  10.00  0.00  1,300,000.00 
6065+780.00     0.00  10.00  0.00  1,300,000.00 
6065+800.00     0.00  10.00  0.00  1,300,000.00 
6065+820.00     0.00  10.00  0.00  1,300,000.00 
6065+840.00     0.00  10.00  0.00  1,300,000.00 
6065+860.00     0.00  10.00  0.00  1,300,000.00 
6065+880.00     0.00  10.00  0.00  1,300,000.00 
6065+900.00     0.00  10.00  0.00  1,300,000.00 
6065+920.00     0.00  10.00  0.00  1,300,000.00 
6065+940.00     0.00  10.00  0.00  1,300,000.00 
6065+960.00     0.00  10.00  0.00  1,300,000.00 
6065+980.00     0.00  10.00  0.00  1,300,000.00 
6066+000.00     0.00  10.00  0.00  1,300,000.00 
6066+020.00     0.00  10.00  0.00  1,300,000.00 
6066+040.00     0.00  10.00  0.00  1,300,000.00 
6066+060.00     0.00  10.00  0.00  1,300,000.00 
6066+080.00     0.00  10.00  0.00  1,300,000.00 
6066+100.00     0.00  10.00  0.00  1,300,000.00 
6066+120.00     0.00  10.00  0.00  1,300,000.00 
6066+140.00     0.00  10.00  0.00  1,300,000.00 
6066+160.00     0.00  10.00  0.00  1,300,000.00 
6066+180.00     0.00  10.00  0.00  1,300,000.00 
6066+200.00     0.00  10.00  0.00  1,300,000.00 
6066+220.00     0.00  10.00  0.00  1,300,000.00 
6066+240.00     0.00  10.00  0.00  1,300,000.00 
6066+260.00     0.00  10.00  0.00  1,300,000.00 
6066+280.00     0.00  10.00  0.00  1,300,000.00 
6066+300.00     0.00  10.00  0.00  1,300,000.00 
6066+320.00     0.00  10.00  0.00  1,300,000.00 
6066+340.00     0.00  10.00  0.00  1,300,000.00 
6066+360.00     0.00  10.00  0.00  1,300,000.00 

563 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

6066+380.00     0.00  10.00  0.00  1,300,000.00 


6066+400.00     0.00  10.00  0.00  1,300,000.00 
6066+420.00     0.00  10.00  0.00  1,300,000.00 
6066+440.00     0.00  10.00  0.00  1,300,000.00 
6066+460.00     0.00  10.00  0.00  1,300,000.00 
6066+480.00     0.00  10.00  0.00  1,300,000.00 
6066+500.00     0.00  10.00  0.00  1,300,000.00 
6066+520.00     0.00  10.00  0.00  1,300,000.00 
6066+540.00     0.00  10.00  0.00  1,300,000.00 
6066+560.00     0.00  10.00  0.00  1,300,000.00 
6066+580.00     0.00  10.00  0.00  1,300,000.00 
6066+600.00     0.00  10.00  0.00  1,300,000.00 
6066+620.00     0.00  10.00  0.00  1,300,000.00 
6066+640.00     0.00  10.00  0.00  1,300,000.00 
6066+660.00     0.00  10.00  0.00  1,300,000.00 
6066+680.00     0.00  10.00  0.00  1,300,000.00 
6066+700.00     0.00  10.00  0.00  1,300,000.00 
6066+720.00     0.00  10.00  0.00  1,300,000.00 
6066+740.00     0.00  10.00  0.00  1,300,000.00 
6066+760.00     0.00  10.00  0.00  1,300,000.00 
6066+780.00     0.00  10.00  0.00  1,300,000.00 
6066+800.00     0.00  10.00  0.00  1,300,000.00 
6066+820.00     0.00  10.00  0.00  1,300,000.00 
6066+840.00     0.00  10.00  0.00  1,300,000.00 
6066+860.00     0.00  10.00  0.00  1,300,000.00 
6066+880.00     0.00  10.00  0.00  1,300,000.00 
6066+900.00     0.00  10.00  0.00  1,300,000.00 
6066+920.00     0.00  10.00  0.00  1,300,000.00 
6066+940.00     0.00  10.00  0.00  1,300,000.00 
6066+960.00     0.00  10.00  0.00  1,300,000.00 
6066+980.00     0.00  10.00  0.00  1,300,000.00 
6067+000.00     0.00  10.00  0.00  1,300,000.00 
 

6.1.4. Cálculo de acarreos para balasto 
A diferencia de las terracerías, el cálculo de la sección de balasto se diferenció en vía principal y vías 
secundarías  siendo  estas  últimas  los  laderos,  culatones  (colas  de  maniobra),  vía  izquierda  y/o 
derecha de estaciones, etc. 

A continuación, se presentan los cálculos en las siguientes tablas para el acarreo del material para 
la construcción de la capa de balasto. 

564 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TABLA 40 CÁLCULO DE ACARREOS DE BALASTO VÍA PRINCIPAL DEL TRAMO [ADMINISTRADOR] 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5000+000.00  2.29  2.29        1,300,000.00 


5000+020.00  2.29  4.59  10.00  45.88  1,299,954.12 
5000+040.00  2.29  4.59  10.00  45.88  1,299,908.24 
5000+060.00  2.29  4.59  10.00  45.88  1,299,862.36 
5000+080.00  2.29  4.59  10.00  45.88  1,299,816.48 
5000+100.00  2.29  4.59  10.00  45.88  1,299,770.60 
5000+120.00  2.29  4.59  10.00  45.88  1,299,724.72 
5000+140.00  2.29  4.59  10.00  45.88  1,299,678.84 
5000+160.00  2.29  4.59  10.00  45.88  1,299,632.96 
5000+180.00  2.29  4.59  10.00  45.88  1,299,587.08 
5000+200.00  2.29  4.59  10.00  45.88  1,299,541.20 
5000+220.00  2.29  4.59  10.00  45.88  1,299,495.32 
5000+240.00  2.29  4.59  10.00  45.88  1,299,449.44 
5000+260.00  2.30  4.59  10.00  45.89  1,299,403.55 
5000+280.00  2.30  4.59  10.00  45.90  1,299,357.65 
5000+300.00  2.30  4.59  10.00  45.90  1,299,311.75 
5000+320.00  2.29  4.59  10.00  45.89  1,299,265.86 
5000+340.00  2.30  4.59  10.00  45.89  1,299,219.97 
5000+360.00  2.30  4.59  10.00  45.90  1,299,174.07 
5000+380.00  2.30  4.59  10.00  45.90  1,299,128.17 
5000+400.00  2.29  4.59  10.00  45.89  1,299,082.28 
5000+420.00  2.29  4.59  10.00  45.88  1,299,036.40 
5000+440.00  2.29  4.59  10.00  45.88  1,298,990.52 
5000+440.00  2.29  4.59  0.00  0.00  1,298,990.52 
5000+460.00  2.29  4.59  10.00  45.88  1,298,944.64 
5000+480.00  2.29  4.59  10.00  45.88  1,298,898.76 
5000+500.00  2.29  4.59  10.00  45.88  1,298,852.88 
5000+520.00  2.29  4.59  10.00  45.88  1,298,807.00 
5000+540.00  2.29  4.59  10.00  45.88  1,298,761.12 
5000+560.00  2.29  4.59  10.00  45.88  1,298,715.24 
5000+580.00  2.29  4.59  10.00  45.88  1,298,669.36 
5000+600.00  2.30  4.59  10.00  45.89  1,298,623.47 
5000+620.00  2.29  4.59  10.00  45.89  1,298,577.58 
5000+640.00  2.29  4.59  10.00  45.88  1,298,531.70 
5000+660.00  2.29  4.59  10.00  45.88  1,298,485.82 
5000+680.00  2.30  4.59  10.00  45.89  1,298,439.93 
5000+700.00  2.29  4.59  10.00  45.89  1,298,394.04 
5000+720.00  2.29  4.59  10.00  45.88  1,298,348.16 
5000+740.00  2.29  4.59  10.00  45.88  1,298,302.28 
5000+760.00  2.29  4.59  10.00  45.88  1,298,256.40 
5000+780.00  2.29  4.59  10.00  45.88  1,298,210.52 
5000+800.00  2.29  4.59  10.00  45.88  1,298,164.64 
5000+820.00  2.29  4.59  10.00  45.88  1,298,118.76 

565 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5000+840.00  2.29  4.59  10.00  45.88  1,298,072.88 


5000+860.00  2.29  4.59  10.00  45.88  1,298,027.00 
5000+880.00  2.29  4.59  10.00  45.88  1,297,981.12 
5000+900.00  2.29  4.59  10.00  45.88  1,297,935.24 
5000+920.00  2.29  4.59  10.00  45.88  1,297,889.36 
5000+940.00  2.30  4.59  10.00  45.89  1,297,843.47 
5000+960.00  2.30  4.59  10.00  45.90  1,297,797.57 
5000+960.00  2.30  4.59  0.00  0.00  1,297,797.57 
5000+980.00  2.29  4.59  10.00  45.89  1,297,751.68 
5001+000.00  2.30  4.59  10.00  45.89  1,297,705.79 
5001+020.00  2.30  4.59  10.00  45.90  1,297,659.89 
5001+040.00  2.29  4.59  10.00  45.89  1,297,614.00 
5001+060.00  2.30  4.59  10.00  45.89  1,297,568.11 
5001+080.00  2.30  4.59  10.00  45.90  1,297,522.21 
5001+100.00  2.30  4.59  10.00  45.90  1,297,476.31 
5001+120.00  2.29  4.59  10.00  45.89  1,297,430.42 
5001+140.00  2.30  4.59  10.00  45.89  1,297,384.53 
5001+160.00  2.30  4.59  10.00  45.90  1,297,338.63 
5001+180.00  2.30  4.59  10.00  45.90  1,297,292.73 
5001+200.00  2.29  4.59  10.00  45.89  1,297,246.84 
5001+220.00  2.30  4.59  10.00  45.89  1,297,200.95 
5001+240.00  2.30  4.59  10.00  45.90  1,297,155.05 
5001+260.00  2.30  4.59  10.00  45.90  1,297,109.15 
5001+280.00  2.30  4.59  10.00  45.90  1,297,063.25 
5001+300.00  2.30  4.59  10.00  45.90  1,297,017.35 
5001+320.00  2.30  4.59  10.00  45.90  1,296,971.45 
5001+340.00  2.29  4.59  10.00  45.89  1,296,925.56 
5001+360.00  2.29  4.59  10.00  45.88  1,296,879.68 
5001+380.00  2.29  4.59  10.00  45.88  1,296,833.80 
5001+400.00  2.29  4.59  10.00  45.88  1,296,787.92 
5001+420.00  2.29  4.59  10.00  45.88  1,296,742.04 
5001+440.00  2.29  4.59  10.00  45.88  1,296,696.16 
5001+460.00  2.29  4.59  10.00  45.88  1,296,650.28 
5001+480.00  2.29  4.59  10.00  45.88  1,296,604.40 
5001+500.00  2.29  4.59  10.00  45.88  1,296,558.52 
5001+520.00  2.29  4.59  10.00  45.88  1,296,512.64 
5001+540.00  2.29  4.59  10.00  45.88  1,296,466.76 
5001+560.00  2.29  4.59  10.00  45.88  1,296,420.88 
5001+580.00  2.29  4.59  10.00  45.88  1,296,375.00 
5001+600.00  2.29  4.59  10.00  45.88  1,296,329.12 
5001+620.00  2.29  4.59  10.00  45.88  1,296,283.24 
5001+640.00  2.29  4.59  10.00  45.88  1,296,237.36 
5001+660.00  2.29  4.59  10.00  45.88  1,296,191.48 
5001+680.00  2.29  4.59  10.00  45.88  1,296,145.60 
5001+700.00  2.29  4.59  10.00  45.88  1,296,099.72 

566 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5001+720.00  2.29  4.59  10.00  45.88  1,296,053.84 


5001+740.00  2.29  4.59  10.00  45.88  1,296,007.96 
5001+760.00  2.29  4.59  10.00  45.88  1,295,962.08 
5001+780.00  2.29  4.59  10.00  45.88  1,295,916.20 
5001+800.00  2.29  4.59  10.00  45.88  1,295,870.32 
5001+820.00  2.29  4.59  10.00  45.88  1,295,824.44 
5001+840.00  2.29  4.59  10.00  45.88  1,295,778.56 
5001+860.00  2.29  4.59  10.00  45.88  1,295,732.68 
5001+880.00  2.29  4.59  10.00  45.88  1,295,686.80 
5001+900.00  2.29  4.59  10.00  45.88  1,295,640.92 
5001+920.00  2.29  4.59  10.00  45.88  1,295,595.04 
5001+940.00  2.29  4.59  10.00  45.88  1,295,549.16 
5001+960.00  2.29  4.59  10.00  45.88  1,295,503.28 
5001+980.00  2.29  4.59  10.00  45.88  1,295,457.40 
5002+000.00  2.29  4.59  10.00  45.88  1,295,411.52 
5002+020.00  2.29  4.59  10.00  45.88  1,295,365.64 
5002+040.00  2.29  4.59  10.00  45.88  1,295,319.76 
5002+060.00  2.29  4.59  10.00  45.88  1,295,273.88 
5002+080.00  2.29  4.59  10.00  45.88  1,295,228.00 
5002+100.00  2.29  4.59  10.00  45.88  1,295,182.12 
5002+120.00  2.29  4.59  10.00  45.88  1,295,136.24 
5002+140.00  2.29  4.59  10.00  45.88  1,295,090.36 
5002+160.00  2.29  4.59  10.00  45.88  1,295,044.48 
5002+180.00  2.29  4.59  10.00  45.88  1,294,998.60 
5002+200.00  2.29  4.59  10.00  45.88  1,294,952.72 
5002+220.00  2.29  4.59  10.00  45.88  1,294,906.84 
5002+240.00  2.29  4.59  10.00  45.88  1,294,860.96 
5002+260.00  2.29  4.59  10.00  45.88  1,294,815.08 
5002+280.00  2.29  4.59  10.00  45.88  1,294,769.20 
5002+300.00  2.29  4.59  10.00  45.88  1,294,723.32 
5002+320.00  2.29  4.59  10.00  45.88  1,294,677.44 
5002+340.00  2.29  4.59  10.00  45.88  1,294,631.56 
5002+360.00  2.29  4.59  10.00  45.88  1,294,585.68 
5002+380.00  2.29  4.59  10.00  45.88  1,294,539.80 
5002+400.00  2.29  4.59  10.00  45.88  1,294,493.92 
5002+420.00  2.29  4.59  10.00  45.88  1,294,448.04 
5002+440.00  2.29  4.59  10.00  45.88  1,294,402.16 
5002+460.00  2.29  4.59  10.00  45.88  1,294,356.28 
5002+480.00  2.29  4.59  10.00  45.88  1,294,310.40 
5002+500.00  2.29  4.59  10.00  45.88  1,294,264.52 
5002+520.00  2.29  4.59  10.00  45.88  1,294,218.64 
5002+540.00  2.29  4.59  10.00  45.88  1,294,172.76 
5002+560.00  2.29  4.59  10.00  45.88  1,294,126.88 
5002+580.00  2.29  4.59  10.00  45.88  1,294,081.00 
5002+600.00  2.29  4.59  10.00  45.88  1,294,035.12 

567 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5002+620.00  2.29  4.59  10.00  45.88  1,293,989.24 


5002+640.00  2.29  4.59  10.00  45.88  1,293,943.36 
5002+660.00  2.29  4.59  10.00  45.88  1,293,897.48 
5002+680.00  2.29  4.59  10.00  45.88  1,293,851.60 
5002+700.00  2.29  4.59  10.00  45.88  1,293,805.72 
5002+720.00  2.29  4.59  10.00  45.88  1,293,759.84 
5002+740.00  2.29  4.59  10.00  45.88  1,293,713.96 
5002+745.00  2.29  4.59  2.50  11.47  1,293,702.49 
5002+745.00  2.29  4.59  0.00  0.00  1,293,702.49 
5002+760.00  2.29  4.59  7.50  34.41  1,293,668.08 
5002+780.00  2.29  4.59  10.00  45.88  1,293,622.20 
5002+800.00  2.29  4.59  10.00  45.88  1,293,576.32 
5002+820.00  2.29  4.59  10.00  45.88  1,293,530.44 
5002+840.00  2.29  4.59  10.00  45.88  1,293,484.56 
5002+860.00  2.29  4.59  10.00  45.88  1,293,438.68 
5002+880.00  2.29  4.59  10.00  45.88  1,293,392.80 
5002+900.00  2.29  4.59  10.00  45.88  1,293,346.92 
5002+920.00  2.29  4.59  10.00  45.88  1,293,301.04 
5002+940.00  2.29  4.59  10.00  45.88  1,293,255.16 
5002+960.00  2.29  4.59  10.00  45.88  1,293,209.28 
5002+980.00  2.29  4.59  10.00  45.88  1,293,163.40 
5003+000.00  2.29  4.59  10.00  45.88  1,293,117.52 
5003+020.00  2.29  4.59  10.00  45.88  1,293,071.64 
5003+040.00  2.29  4.59  10.00  45.88  1,293,025.76 
5003+060.00  2.29  4.59  10.00  45.88  1,292,979.88 
5003+080.00  2.29  4.59  10.00  45.88  1,292,934.00 
5003+100.00  2.29  4.59  10.00  45.88  1,292,888.12 
5003+120.00  2.29  4.59  10.00  45.88  1,292,842.24 
5003+140.00  2.29  4.59  10.00  45.88  1,292,796.36 
5003+160.00  2.29  4.59  10.00  45.88  1,292,750.48 
5003+180.00  2.30  4.59  10.00  45.89  1,292,704.59 
5003+200.00  2.30  4.59  10.00  45.90  1,292,658.69 
5003+220.00  2.30  4.59  10.00  45.90  1,292,612.79 
5003+240.00  2.30  4.59  10.00  45.90  1,292,566.89 
5003+260.00  2.30  4.59  10.00  45.90  1,292,520.99 
5003+280.00  2.30  4.59  10.00  45.90  1,292,475.09 
5003+300.00  2.30  4.59  10.00  45.90  1,292,429.19 
5003+320.00  2.30  4.59  10.00  45.90  1,292,383.29 
5003+340.00  2.30  4.59  10.00  45.90  1,292,337.39 
5003+360.00  2.29  4.59  10.00  45.89  1,292,291.50 
5003+380.00  2.29  4.59  10.00  45.88  1,292,245.62 
5003+400.00  2.29  4.59  10.00  45.88  1,292,199.74 
5003+420.00  2.30  4.59  10.00  45.89  1,292,153.85 
5003+440.00  2.30  4.59  10.00  45.90  1,292,107.95 
5003+460.00  2.30  4.59  10.00  45.90  1,292,062.05 

568 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5003+480.00  2.30  4.59  10.00  45.90  1,292,016.15 


5003+490.00  2.30  4.59  5.00  22.95  1,291,993.20 
5003+490.00  2.30  4.59  0.00  0.00  1,291,993.20 
5003+500.00  2.29  4.59  5.00  22.95  1,291,970.26 
5003+520.00  2.29  4.59  10.00  45.88  1,291,924.38 
5003+540.00  2.29  4.59  10.00  45.88  1,291,878.50 
5003+560.00  2.29  4.59  10.00  45.88  1,291,832.62 
5003+580.00  2.29  4.59  10.00  45.88  1,291,786.74 
5003+600.00  2.30  4.59  10.00  45.89  1,291,740.85 
5003+620.00  2.30  4.59  10.00  45.90  1,291,694.95 
5003+640.00  2.30  4.59  10.00  45.90  1,291,649.05 
5003+660.00  2.29  4.59  10.00  45.89  1,291,603.16 
5003+680.00  2.30  4.59  10.00  45.89  1,291,557.27 
5003+700.00  2.29  4.59  10.00  45.89  1,291,511.38 
5003+720.00  2.30  4.59  10.00  45.89  1,291,465.49 
5003+740.00  2.30  4.59  10.00  45.90  1,291,419.59 
5003+760.00  2.29  4.59  10.00  45.89  1,291,373.70 
5003+780.00  2.30  4.59  10.00  45.89  1,291,327.81 
5003+800.00  2.29  4.59  10.00  45.89  1,291,281.92 
5003+820.00  2.30  4.59  10.00  45.89  1,291,236.03 
5003+840.00  2.30  4.59  10.00  45.90  1,291,190.13 
5003+860.00  2.29  4.59  10.00  45.89  1,291,144.24 
5003+880.00  2.29  4.59  10.00  45.88  1,291,098.36 
5003+900.00  2.30  4.59  10.00  45.89  1,291,052.47 
5003+920.00  2.30  4.59  10.00  45.90  1,291,006.57 
5003+940.00  2.29  4.59  10.00  45.89  1,290,960.68 
5003+960.00  2.30  4.59  10.00  45.89  1,290,914.79 
5003+980.00  2.29  4.59  10.00  45.89  1,290,868.90 
5004+000.00  2.29  4.59  10.00  45.88  1,290,823.02 
5004+020.00  2.29  4.59  10.00  45.88  1,290,777.14 
5004+040.00  2.29  4.59  10.00  45.88  1,290,731.26 
5004+060.00  2.29  4.59  10.00  45.88  1,290,685.38 
5004+080.00  2.29  4.59  10.00  45.88  1,290,639.50 
5004+100.00  2.29  4.59  10.00  45.88  1,290,593.62 
5004+120.00  2.29  4.59  10.00  45.88  1,290,547.74 
5004+140.00  2.29  4.59  10.00  45.88  1,290,501.86 
5004+160.00  2.29  4.59  10.00  45.88  1,290,455.98 
5004+180.00  2.29  4.59  10.00  45.88  1,290,410.10 
5004+200.00  2.29  4.59  10.00  45.88  1,290,364.22 
5004+220.00  2.29  4.59  10.00  45.88  1,290,318.34 
5004+240.00  2.29  4.59  10.00  45.88  1,290,272.46 
5004+260.00  2.29  4.59  10.00  45.88  1,290,226.58 
5004+280.00  2.29  4.59  10.00  45.88  1,290,180.70 
5004+300.00  2.29  4.59  10.00  45.88  1,290,134.82 
5004+310.00  2.29  4.59  5.00  22.94  1,290,111.88 

569 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5004+310.00  2.29  4.59  0.00  0.00  1,290,111.88 


5004+320.00  2.29  4.59  5.00  22.94  1,290,088.94 
5004+340.00  2.29  4.59  10.00  45.88  1,290,043.06 
5004+360.00  2.29  4.59  10.00  45.88  1,289,997.18 
5004+380.00  2.29  4.59  10.00  45.88  1,289,951.30 
5004+400.00  2.29  4.59  10.00  45.88  1,289,905.42 
5004+420.00  2.29  4.59  10.00  45.88  1,289,859.54 
5004+440.00  2.29  4.59  10.00  45.88  1,289,813.66 
5004+460.00  2.29  4.59  10.00  45.88  1,289,767.78 
5004+480.00  2.29  4.59  10.00  45.88  1,289,721.90 
5004+490.00  2.29  4.59  5.00  22.94  1,289,698.96 
5004+490.00  2.29  4.59  0.00  0.00  1,289,698.96 
5004+500.00  2.29  4.59  5.00  22.94  1,289,676.02 
5004+520.00  2.29  4.59  10.00  45.88  1,289,630.14 
5004+540.00  2.29  4.59  10.00  45.88  1,289,584.26 
5004+560.00  2.29  4.59  10.00  45.88  1,289,538.38 
5004+580.00  2.29  4.59  10.00  45.88  1,289,492.50 
5004+600.00  2.29  4.59  10.00  45.88  1,289,446.62 
5004+620.00  2.29  4.59  10.00  45.88  1,289,400.74 
5004+640.00  2.29  4.59  10.00  45.88  1,289,354.86 
5004+660.00  2.29  4.59  10.00  45.88  1,289,308.98 
5004+680.00  2.29  4.59  10.00  45.88  1,289,263.10 
5004+700.00  2.29  4.59  10.00  45.88  1,289,217.22 
5004+720.00  2.29  4.59  10.00  45.88  1,289,171.34 
5004+740.00  2.29  4.59  10.00  45.88  1,289,125.46 
5004+760.00  2.29  4.59  10.00  45.88  1,289,079.58 
5004+780.00  2.29  4.59  10.00  45.88  1,289,033.70 
5004+800.00  2.29  4.59  10.00  45.88  1,288,987.82 
5004+800.00  2.29  4.59  0.00  0.00  1,288,987.82 
5004+820.00  2.29  4.59  10.00  45.88  1,288,941.94 
5004+840.00  2.29  4.59  10.00  45.88  1,288,896.06 
5004+860.00  2.29  4.59  10.00  45.88  1,288,850.18 
5004+880.00  2.29  4.59  10.00  45.88  1,288,804.30 
5004+900.00  2.29  4.59  10.00  45.88  1,288,758.42 
5004+920.00  2.29  4.59  10.00  45.88  1,288,712.54 
5004+940.00  2.29  4.59  10.00  45.88  1,288,666.66 
5004+960.00  2.29  4.59  10.00  45.88  1,288,620.78 
5004+980.00  2.29  4.59  10.00  45.88  1,288,574.90 
5004+980.00  2.29  4.59  0.00  0.00  1,288,574.90 
5005+000.00  2.29  4.59  10.00  45.88  1,288,529.02 
5005+020.00  2.29  4.59  10.00  45.88  1,288,483.14 
5005+040.00  2.29  4.59  10.00  45.88  1,288,437.26 
5005+060.00  2.29  4.59  10.00  45.88  1,288,391.38 
5005+080.00  2.29  4.59  10.00  45.88  1,288,345.50 
5005+100.00  2.29  4.59  10.00  45.88  1,288,299.62 

570 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5005+120.00  2.29  4.59  10.00  45.88  1,288,253.74 


5005+140.00  2.29  4.59  10.00  45.88  1,288,207.86 
5005+160.00  2.29  4.59  10.00  45.88  1,288,161.98 
5005+180.00  2.29  4.59  10.00  45.88  1,288,116.10 
5005+200.00  2.29  4.59  10.00  45.88  1,288,070.22 
5005+220.00  2.29  4.59  10.00  45.88  1,288,024.34 
5005+240.00  2.29  4.59  10.00  45.88  1,287,978.46 
5005+260.00  2.29  4.59  10.00  45.88  1,287,932.58 
5005+280.00  2.29  4.59  10.00  45.88  1,287,886.70 
5005+300.00  2.29  4.59  10.00  45.88  1,287,840.82 
5005+320.00  2.29  4.59  10.00  45.88  1,287,794.94 
5005+340.00  2.29  4.59  10.00  45.88  1,287,749.06 
5005+360.00  2.30  4.59  10.00  45.89  1,287,703.17 
5005+380.00  2.29  4.59  10.00  45.89  1,287,657.28 
5005+400.00  2.29  4.59  10.00  45.88  1,287,611.40 
5005+420.00  2.30  4.59  10.00  45.89  1,287,565.51 
5005+440.00  2.29  4.59  10.00  45.89  1,287,519.62 
5005+460.00  2.30  4.59  10.00  45.89  1,287,473.73 
5005+480.00  2.29  4.59  10.00  45.89  1,287,427.84 
5005+500.00  2.29  4.59  10.00  45.88  1,287,381.96 
5005+520.00  2.30  4.59  10.00  45.89  1,287,336.07 
5005+540.00  2.30  4.59  10.00  45.90  1,287,290.17 
5005+560.00  2.30  4.59  10.00  45.90  1,287,244.27 
5005+580.00  2.29  4.59  10.00  45.89  1,287,198.38 
5005+600.00  2.30  4.59  10.00  45.89  1,287,152.49 
5005+620.00  2.30  4.59  10.00  45.90  1,287,106.59 
5005+640.00  2.30  4.59  10.00  45.90  1,287,060.69 
5005+660.00  2.29  4.59  10.00  45.89  1,287,014.80 
5005+680.00  2.29  4.59  10.00  45.88  1,286,968.92 
5005+680.00  2.29  4.59  0.00  0.00  1,286,968.92 
5005+700.00  2.30  4.59  10.00  45.89  1,286,923.03 
5005+720.00  2.29  4.59  10.00  45.89  1,286,877.14 
5005+740.00  2.30  4.59  10.00  45.89  1,286,831.25 
5005+760.00  2.30  4.59  10.00  45.90  1,286,785.35 
5005+780.00  2.30  4.59  10.00  45.90  1,286,739.45 
5005+800.00  2.29  4.59  10.00  45.89  1,286,693.56 
5005+820.00  2.29  4.59  10.00  45.88  1,286,647.68 
5005+840.00  2.29  4.59  10.00  45.88  1,286,601.80 
5005+860.00  2.29  4.59  10.00  45.88  1,286,555.92 
5005+880.00  2.29  4.59  10.00  45.88  1,286,510.04 
5005+890.00  2.29  4.59  5.00  22.94  1,286,487.10 
5005+890.00  2.29  4.59  0.00  0.00  1,286,487.10 
5005+900.00  2.29  4.59  5.00  22.94  1,286,464.16 
5005+920.00  2.29  4.59  10.00  45.88  1,286,418.28 
5005+940.00  2.29  4.59  10.00  45.88  1,286,372.40 

571 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5005+960.00  2.29  4.59  10.00  45.88  1,286,326.52 


5005+980.00  2.29  4.59  10.00  45.88  1,286,280.64 
5006+000.00  2.29  4.59  10.00  45.88  1,286,234.76 
5006+020.00  2.29  4.59  10.00  45.88  1,286,188.88 
5006+040.00  2.29  4.59  10.00  45.88  1,286,143.00 
5006+060.00  2.29  4.59  10.00  45.88  1,286,097.12 
5006+080.00  2.29  4.59  10.00  45.88  1,286,051.24 
5006+100.00  2.29  4.59  10.00  45.88  1,286,005.36 
5006+120.00  2.29  4.59  10.00  45.88  1,285,959.48 
5006+140.00  2.29  4.59  10.00  45.88  1,285,913.60 
5006+160.00  2.29  4.59  10.00  45.88  1,285,867.72 
5006+180.00  2.29  4.59  10.00  45.88  1,285,821.84 
5006+200.00  2.29  4.59  10.00  45.88  1,285,775.96 
5006+220.00  2.29  4.59  10.00  45.88  1,285,730.08 
5006+240.00  2.29  4.59  10.00  45.88  1,285,684.20 
5006+260.00  2.29  4.59  10.00  45.88  1,285,638.32 
5006+280.00  2.29  4.59  10.00  45.88  1,285,592.44 
5006+300.00  2.29  4.59  10.00  45.88  1,285,546.56 
5006+310.00  2.29  4.59  5.00  22.94  1,285,523.62 
5006+310.00  2.29  4.59  0.00  0.00  1,285,523.61 
5006+320.00  2.29  4.59  5.00  22.94  1,285,500.68 
5006+340.00  2.29  4.59  10.00  45.88  1,285,454.80 
5006+360.00  2.29  4.59  10.00  45.88  1,285,408.92 
5006+380.00  2.29  4.59  10.00  45.88  1,285,363.04 
5006+400.00  2.29  4.59  10.00  45.88  1,285,317.16 
5006+420.00  2.29  4.59  10.00  45.88  1,285,271.28 
5006+440.00  2.29  4.59  10.00  45.88  1,285,225.40 
5006+460.00  2.29  4.59  10.00  45.88  1,285,179.52 
5006+480.00  2.29  4.59  10.00  45.88  1,285,133.64 
5006+500.00  2.29  4.59  10.00  45.88  1,285,087.76 
5006+520.00  2.29  4.59  10.00  45.88  1,285,041.88 
5006+540.00  2.29  4.59  10.00  45.88  1,284,996.00 
5006+560.00  2.29  4.59  10.00  45.88  1,284,950.12 
5006+580.00  2.29  4.59  10.00  45.88  1,284,904.24 
5006+600.00  2.29  4.59  10.00  45.88  1,284,858.36 
5006+620.00  2.29  4.59  10.00  45.88  1,284,812.48 
5006+640.00  2.29  4.59  10.00  45.88  1,284,766.60 
5006+660.00  2.29  4.59  10.00  45.88  1,284,720.72 
5006+680.00  2.29  4.59  10.00  45.88  1,284,674.84 
5006+700.00  2.29  4.59  10.00  45.88  1,284,628.96 
5006+720.00  2.29  4.59  10.00  45.88  1,284,583.08 
5006+740.00  2.29  4.59  10.00  45.88  1,284,537.20 
5006+760.00  2.29  4.59  10.00  45.88  1,284,491.32 
5006+780.00  2.29  4.59  10.00  45.88  1,284,445.44 
5006+790.00  2.29  4.59  5.00  22.94  1,284,422.50 

572 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5006+800.00  2.32  4.61  5.00  23.05  1,284,399.45 


5006+810.00  2.30  4.61  5.00  23.05  1,284,376.40 
5006+820.00  2.30  4.59  5.00  22.95  1,284,353.45 
5006+830.00  2.30  4.59  5.00  22.95  1,284,330.50 
5006+840.00  2.30  4.59  5.00  22.95  1,284,307.55 
5006+850.00  2.30  4.59  5.00  22.95  1,284,284.60 
5006+860.00  2.30  4.59  5.00  22.95  1,284,261.65 
5006+870.00  2.30  4.59  5.00  22.95  1,284,238.70 
5006+880.00  2.30  4.59  5.00  22.95  1,284,215.75 
5006+890.00  2.30  4.59  5.00  22.95  1,284,192.80 
5006+900.00  2.30  4.59  5.00  22.95  1,284,169.85 
5006+910.00  2.30  4.59  5.00  22.95  1,284,146.90 
5006+920.00  2.30  4.59  5.00  22.95  1,284,123.95 
5006+930.00  2.30  4.59  5.00  22.95  1,284,101.00 
5006+940.00  2.30  4.59  5.00  22.95  1,284,078.05 
5006+950.00  2.30  4.59  5.00  22.95  1,284,055.10 
5006+960.00  2.30  4.59  5.00  22.95  1,284,032.15 
5006+970.00  2.30  4.59  5.00  22.95  1,284,009.20 
5006+980.00  2.30  4.59  5.00  22.95  1,283,986.25 
5007+000.00  2.30  4.59  10.00  45.90  1,283,940.35 
5007+020.00  2.30  4.59  10.00  45.90  1,283,894.45 
5007+040.00  2.30  4.59  10.00  45.90  1,283,848.55 
5007+060.00  2.30  4.59  10.00  45.90  1,283,802.65 
5007+080.00  2.30  4.59  10.00  45.90  1,283,756.75 
5007+100.00  2.30  4.59  10.00  45.90  1,283,710.85 
5007+120.00  2.30  4.59  10.00  45.90  1,283,664.95 
5007+140.00  2.30  4.59  10.00  45.90  1,283,619.05 
5007+160.00  2.30  4.59  10.00  45.90  1,283,573.15 
5007+180.00  2.30  4.59  10.00  45.90  1,283,527.25 
5007+180.00  2.30  4.59  0.00  0.00  1,283,527.25 
5007+200.00  2.30  4.59  10.00  45.90  1,283,481.35 
5007+220.00  2.30  4.59  10.00  45.90  1,283,435.45 
5007+240.00  2.30  4.59  10.00  45.90  1,283,389.55 
5007+260.00  2.30  4.59  10.00  45.90  1,283,343.65 
5007+280.00  2.30  4.59  10.00  45.90  1,283,297.75 
5007+300.00  2.30  4.59  10.00  45.90  1,283,251.85 
5007+320.00  2.30  4.59  10.00  45.90  1,283,205.95 
5007+340.00  2.30  4.59  10.00  45.90  1,283,160.05 
5007+360.00  2.30  4.59  10.00  45.90  1,283,114.15 
5007+360.00  2.30  4.59  0.00  0.00  1,283,114.15 
5007+380.00  2.30  4.59  10.00  45.90  1,283,068.25 
5007+400.00  2.30  4.59  10.00  45.90  1,283,022.35 
5007+420.00  2.30  4.59  10.00  45.90  1,282,976.45 
5007+440.00  2.30  4.59  10.00  45.90  1,282,930.55 
5007+460.00  2.30  4.59  10.00  45.90  1,282,884.65 

573 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5007+480.00  2.30  4.59  10.00  45.90  1,282,838.75 


5007+500.00  2.30  4.59  10.00  45.90  1,282,792.85 
5007+520.00  2.30  4.59  10.00  45.90  1,282,746.95 
5007+540.00  2.30  4.59  10.00  45.90  1,282,701.05 
5007+560.00  2.30  4.59  10.00  45.90  1,282,655.15 
5007+580.00  2.30  4.59  10.00  45.90  1,282,609.25 
5007+600.00  2.30  4.59  10.00  45.90  1,282,563.35 
5007+620.00  2.30  4.59  10.00  45.90  1,282,517.45 
5007+640.00  2.30  4.59  10.00  45.90  1,282,471.55 
5007+660.00  2.30  4.59  10.00  45.90  1,282,425.65 
5007+680.00  2.30  4.59  10.00  45.90  1,282,379.75 
5007+700.00  2.30  4.59  10.00  45.90  1,282,333.85 
5007+720.00  2.30  4.59  10.00  45.90  1,282,287.95 
5007+740.00  2.30  4.59  10.00  45.90  1,282,242.05 
5007+760.00  2.30  4.59  10.00  45.90  1,282,196.15 
5007+780.00  2.30  4.59  10.00  45.90  1,282,150.25 
5007+800.00  2.30  4.59  10.00  45.90  1,282,104.35 
5007+820.00  2.30  4.59  10.00  45.90  1,282,058.45 
5007+840.00  2.30  4.59  10.00  45.90  1,282,012.55 
5007+860.00  2.30  4.59  10.00  45.90  1,281,966.65 
5007+880.00  2.30  4.59  10.00  45.90  1,281,920.75 
5007+900.00  2.30  4.59  10.00  45.90  1,281,874.85 
5007+920.00  2.30  4.59  10.00  45.90  1,281,828.95 
5007+940.00  2.30  4.59  10.00  45.90  1,281,783.05 
5007+960.00  2.30  4.59  10.00  45.90  1,281,737.15 
5007+980.00  2.30  4.59  10.00  45.90  1,281,691.25 
5008+000.00  2.30  4.59  10.00  45.90  1,281,645.35 
5008+020.00  2.30  4.59  10.00  45.90  1,281,599.45 
5008+040.00  2.30  4.59  10.00  45.90  1,281,553.55 
5008+060.00  2.30  4.59  10.00  45.90  1,281,507.65 
5008+080.00  2.30  4.59  10.00  45.90  1,281,461.75 
5008+100.00  2.30  4.59  10.00  45.90  1,281,415.85 
5008+120.00  2.30  4.59  10.00  45.90  1,281,369.95 
5008+140.00  2.30  4.59  10.00  45.90  1,281,324.05 
5008+155.00  2.30  4.59  7.50  34.43  1,281,289.63 
5008+155.00  2.30  4.59  0.00  0.00  1,281,289.63 
5008+160.00  2.30  4.59  2.50  11.48  1,281,278.15 
5008+180.00  2.30  4.59  10.00  45.90  1,281,232.25 
5008+200.00  2.30  4.59  10.00  45.90  1,281,186.35 
5008+220.00  2.30  4.59  10.00  45.90  1,281,140.45 
5008+240.00  2.30  4.59  10.00  45.90  1,281,094.55 
5008+260.00  2.30  4.59  10.00  45.90  1,281,048.65 
5008+280.00  2.30  4.59  10.00  45.90  1,281,002.75 
5008+300.00  2.30  4.59  10.00  45.90  1,280,956.85 
5008+320.00  2.30  4.59  10.00  45.90  1,280,910.95 

574 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5008+340.00  2.30  4.59  10.00  45.90  1,280,865.05 


5008+360.00  2.30  4.59  10.00  45.90  1,280,819.15 
5008+380.00  2.30  4.59  10.00  45.90  1,280,773.25 
5008+380.00  2.30  4.59  0.00  0.00  1,280,773.25 
5008+400.00  2.30  4.59  10.00  45.90  1,280,727.35 
5008+420.00  2.30  4.59  10.00  45.90  1,280,681.45 
5008+440.00  2.30  4.59  10.00  45.90  1,280,635.55 
5008+460.00  2.30  4.59  10.00  45.90  1,280,589.65 
5008+470.00  2.30  4.59  5.00  22.95  1,280,566.70 
5008+480.00  2.30  4.59  5.00  22.95  1,280,543.75 
5008+490.00  2.30  4.59  5.00  22.95  1,280,520.80 
5008+500.00  2.30  4.59  5.00  22.95  1,280,497.85 
5008+510.00  2.30  4.59  5.00  22.95  1,280,474.90 
5008+520.00  2.30  4.59  5.00  22.95  1,280,451.95 
5008+530.00  2.30  4.59  5.00  22.95  1,280,429.00 
5008+540.00  2.30  4.59  5.00  22.95  1,280,406.05 
5008+550.00  2.30  4.59  5.00  22.95  1,280,383.10 
5008+560.00  2.30  4.59  5.00  22.95  1,280,360.15 
5008+570.00  2.30  4.59  5.00  22.95  1,280,337.20 
5008+580.00  2.30  4.59  5.00  22.95  1,280,314.25 
5008+590.00  2.30  4.59  5.00  22.95  1,280,291.30 
5008+600.00  2.30  4.59  5.00  22.95  1,280,268.35 
5008+610.00  2.30  4.59  5.00  22.95  1,280,245.40 
5008+620.00  2.30  4.59  5.00  22.95  1,280,222.45 
5008+629.97  2.30  4.59  4.98  22.88  1,280,199.57 
5008+629.97  2.30  4.59  0.00  0.00  1,280,199.57 
5008+640.00  2.32  4.61  5.01  23.12  1,280,176.44 
5008+649.97  2.29  4.61  4.98  22.98  1,280,153.46 
5008+649.97  2.29  4.59  0.00  0.00  1,280,153.46 
5008+660.00  2.29  4.59  5.01  23.01  1,280,130.46 
5008+680.00  2.29  4.59  10.00  45.88  1,280,084.58 
5008+700.00  2.29  4.59  10.00  45.88  1,280,038.70 
5008+720.00  2.29  4.59  10.00  45.88  1,279,992.82 
5008+740.00  2.30  4.59  10.00  45.89  1,279,946.93 
5008+760.00  2.29  4.59  10.00  45.89  1,279,901.04 
5008+780.00  2.30  4.59  10.00  45.89  1,279,855.15 
5008+800.00  2.29  4.59  10.00  45.89  1,279,809.26 
5008+820.00  2.30  4.59  10.00  45.89  1,279,763.37 
5008+840.00  2.29  4.59  10.00  45.89  1,279,717.48 
5008+860.00  2.30  4.59  10.00  45.89  1,279,671.59 
5008+880.00  2.29  4.59  10.00  45.89  1,279,625.70 
5008+900.00  2.29  4.59  10.00  45.88  1,279,579.82 
5008+920.00  2.29  4.59  10.00  45.88  1,279,533.94 
5008+940.00  2.29  4.59  10.00  45.88  1,279,488.06 
5008+960.00  2.29  4.59  10.00  45.88  1,279,442.18 

575 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5008+980.00  2.29  4.59  10.00  45.88  1,279,396.30 


5009+000.00  2.29  4.59  10.00  45.88  1,279,350.42 
5009+020.00  2.29  4.59  10.00  45.88  1,279,304.54 
5009+040.00  2.29  4.59  10.00  45.88  1,279,258.66 
5009+060.00  2.30  4.59  10.00  45.89  1,279,212.77 
5009+080.00  2.29  4.59  10.00  45.89  1,279,166.88 
5009+090.00  2.30  4.59  5.00  22.95  1,279,143.93 
5009+090.00  2.30  4.59  0.00  0.00  1,279,143.93 
5009+100.00  2.30  4.59  5.00  22.95  1,279,120.98 
5009+120.00  2.29  4.59  10.00  45.89  1,279,075.09 
5009+130.00  2.30  4.59  5.00  22.95  1,279,052.15 
5009+140.00  2.30  4.59  5.00  22.95  1,279,029.20 
5009+160.00  2.29  4.59  10.00  45.89  1,278,983.31 
5009+180.00  2.30  4.59  10.00  45.89  1,278,937.42 
5009+200.00  2.29  4.59  10.00  45.89  1,278,891.53 
5009+200.00  2.29  4.59  0.00  0.00  1,278,891.53 
5009+220.00  2.29  4.59  10.00  45.88  1,278,845.65 
5009+240.00  2.29  4.59  10.00  45.88  1,278,799.77 
5009+260.00  2.29  4.59  10.00  45.88  1,278,753.89 
5009+280.00  2.29  4.59  10.00  45.88  1,278,708.01 
5009+300.00  2.29  4.59  10.00  45.88  1,278,662.13 
5009+320.00  2.29  4.59  10.00  45.88  1,278,616.25 
5009+340.00  2.29  4.59  10.00  45.88  1,278,570.37 
5009+360.00  2.29  4.59  10.00  45.88  1,278,524.49 
5009+380.00  2.29  4.59  10.00  45.88  1,278,478.61 
5009+400.00  2.29  4.59  10.00  45.88  1,278,432.73 
5009+420.00  2.29  4.59  10.00  45.88  1,278,386.85 
5009+440.00  2.29  4.59  10.00  45.88  1,278,340.97 
5009+460.00  2.29  4.59  10.00  45.88  1,278,295.09 
5009+480.00  2.29  4.59  10.00  45.88  1,278,249.21 
5009+500.00  2.29  4.59  10.00  45.88  1,278,203.33 
5009+520.00  2.29  4.59  10.00  45.88  1,278,157.45 
5009+540.00  2.29  4.59  10.00  45.88  1,278,111.57 
5009+560.00  2.29  4.59  10.00  45.88  1,278,065.69 
5009+580.00  2.29  4.59  10.00  45.88  1,278,019.81 
5009+587.89  2.29  4.59  3.94  18.09  1,278,001.72 
5009+600.00  2.27  4.57  6.06  27.66  1,277,974.05 
5009+620.00  2.24  4.51  10.00  45.10  1,277,928.95 
5009+640.00  2.20  4.44  10.00  44.40  1,277,884.55 
5009+660.00  2.19  4.39  10.00  43.92  1,277,840.63 
5009+680.00  2.22  4.41  10.00  44.10  1,277,796.53 
5009+700.00  2.25  4.47  10.00  44.74  1,277,751.79 
5009+717.89  2.28  4.54  8.94  40.56  1,277,711.23 
5009+720.00  2.28  4.57  1.06  4.83  1,277,706.40 
5009+740.00  2.28  4.57  10.00  45.66  1,277,660.74 

576 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5009+760.00  2.28  4.57  10.00  45.66  1,277,615.08 


5009+780.00  2.28  4.57  10.00  45.66  1,277,569.42 
5009+800.00  2.28  4.57  10.00  45.66  1,277,523.76 
5009+817.42  2.28  4.57  8.71  39.76  1,277,484.00 
5009+820.00  2.28  4.56  1.29  5.89  1,277,478.11 
5009+840.00  2.25  4.53  10.00  45.25  1,277,432.86 
5009+850.00  2.23  4.48  5.00  22.38  1,277,410.48 
5009+850.00  2.23  4.46  0.00  0.00  1,277,410.48 
5009+860.00  2.21  4.44  5.00  22.22  1,277,388.26 
5009+880.00  2.18  4.40  10.00  43.95  1,277,344.31 
5009+900.00  2.21  4.39  10.00  43.92  1,277,300.39 
5009+920.00  2.25  4.46  10.00  44.56  1,277,255.83 
5009+940.00  2.28  4.53  10.00  45.27  1,277,210.56 
5009+947.42  2.29  4.58  3.71  16.97  1,277,193.59 
5009+960.00  2.29  4.59  6.29  28.87  1,277,164.73 
5009+980.00  2.29  4.59  10.00  45.88  1,277,118.85 
5010+000.00  2.29  4.59  10.00  45.88  1,277,072.97 
5010+020.00  2.29  4.59  10.00  45.88  1,277,027.09 
5010+040.00  2.29  4.59  10.00  45.88  1,276,981.21 
5010+060.00  2.29  4.59  10.00  45.88  1,276,935.33 
5010+080.00  2.29  4.59  10.00  45.88  1,276,889.45 
5010+100.00  2.29  4.59  10.00  45.88  1,276,843.57 
5010+120.00  2.29  4.59  10.00  45.88  1,276,797.69 
5010+140.00  2.29  4.59  10.00  45.88  1,276,751.81 
5010+160.00  2.29  4.59  10.00  45.88  1,276,705.93 
5010+180.00  2.29  4.59  10.00  45.88  1,276,660.05 
5010+200.00  2.29  4.59  10.00  45.88  1,276,614.17 
5010+220.00  2.29  4.59  10.00  45.88  1,276,568.29 
5010+240.00  2.29  4.59  10.00  45.88  1,276,522.41 
5010+260.00  2.29  4.59  10.00  45.88  1,276,476.53 
5010+280.00  2.29  4.59  10.00  45.88  1,276,430.65 
5010+300.00  2.29  4.59  10.00  45.88  1,276,384.77 
5010+320.00  2.29  4.59  10.00  45.88  1,276,338.89 
5010+340.00  2.29  4.59  10.00  45.88  1,276,293.01 
5010+360.00  2.29  4.59  10.00  45.88  1,276,247.13 
5010+380.00  2.29  4.59  10.00  45.88  1,276,201.25 
5010+400.00  2.29  4.59  10.00  45.88  1,276,155.37 
5010+420.00  2.29  4.59  10.00  45.88  1,276,109.49 
5010+440.00  2.29  4.59  10.00  45.88  1,276,063.61 
5010+460.00  2.29  4.59  10.00  45.88  1,276,017.73 
5010+480.00  2.29  4.59  10.00  45.88  1,275,971.85 
5010+500.00  2.29  4.59  10.00  45.88  1,275,925.97 
5010+520.00  2.29  4.59  10.00  45.88  1,275,880.09 
5010+540.00  2.29  4.59  10.00  45.88  1,275,834.21 
5010+560.00  2.29  4.59  10.00  45.88  1,275,788.33 

577 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5010+580.00  2.29  4.59  10.00  45.88  1,275,742.45 


5010+600.00  2.29  4.59  10.00  45.88  1,275,696.57 
5010+620.00  2.29  4.59  10.00  45.88  1,275,650.69 
5010+640.00  2.29  4.59  10.00  45.88  1,275,604.81 
5010+660.00  2.29  4.59  10.00  45.88  1,275,558.93 
5010+680.00  2.29  4.59  10.00  45.88  1,275,513.05 
5010+700.00  2.29  4.59  10.00  45.88  1,275,467.17 
5010+720.00  2.29  4.59  10.00  45.88  1,275,421.29 
5010+740.00  2.30  4.59  10.00  45.89  1,275,375.40 
5010+760.00  2.29  4.59  10.00  45.89  1,275,329.51 
5010+780.00  2.29  4.59  10.00  45.88  1,275,283.63 
5010+800.00  2.30  4.59  10.00  45.89  1,275,237.74 
5010+820.00  2.30  4.59  10.00  45.90  1,275,191.84 
5010+840.00  2.30  4.59  10.00  45.90  1,275,145.94 
5010+860.00  2.30  4.59  10.00  45.90  1,275,100.04 
5010+880.00  2.30  4.59  10.00  45.90  1,275,054.14 
5010+900.00  2.30  4.59  10.00  45.90  1,275,008.24 
5010+920.00  2.30  4.59  10.00  45.90  1,274,962.34 
5010+940.00  2.30  4.59  10.00  45.90  1,274,916.44 
5010+960.00  2.29  4.59  10.00  45.89  1,274,870.55 
5010+980.00  2.30  4.59  10.00  45.89  1,274,824.66 
5011+000.00  2.30  4.59  10.00  45.90  1,274,778.76 
5011+020.00  2.29  4.59  10.00  45.89  1,274,732.87 
5011+040.00  2.30  4.59  10.00  45.89  1,274,686.98 
5011+060.00  2.29  4.59  10.00  45.89  1,274,641.09 
5011+080.00  2.29  4.59  10.00  45.88  1,274,595.21 
5011+100.00  2.30  4.59  10.00  45.89  1,274,549.32 
5011+120.00  2.30  4.59  10.00  45.90  1,274,503.42 
5011+140.00  2.29  4.59  10.00  45.89  1,274,457.53 
5011+160.00  2.29  4.59  10.00  45.88  1,274,411.65 
5011+180.00  2.30  4.59  10.00  45.89  1,274,365.76 
5011+200.00  2.29  4.59  10.00  45.89  1,274,319.87 
5011+220.00  2.29  4.59  10.00  45.88  1,274,273.99 
5011+240.00  2.29  4.59  10.00  45.88  1,274,228.11 
5011+260.00  2.29  4.59  10.00  45.88  1,274,182.23 
5011+280.00  2.29  4.59  10.00  45.88  1,274,136.35 
5011+300.00  2.29  4.59  10.00  45.88  1,274,090.47 
5011+320.00  2.29  4.59  10.00  45.88  1,274,044.59 
5011+340.00  2.29  4.59  10.00  45.88  1,273,998.71 
5011+360.00  2.29  4.59  10.00  45.88  1,273,952.83 
5011+380.00  2.29  4.59  10.00  45.88  1,273,906.95 
5011+400.00  2.29  4.59  10.00  45.88  1,273,861.07 
5011+420.00  2.30  4.59  10.00  45.89  1,273,815.18 
5011+420.00  2.30  4.59  0.00  0.00  1,273,815.18 
5011+440.00  2.30  4.59  10.00  45.90  1,273,769.28 

578 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5011+460.00  2.29  4.59  10.00  45.89  1,273,723.39 


5011+480.00  2.30  4.59  10.00  45.89  1,273,677.50 
5011+500.00  2.30  4.59  10.00  45.90  1,273,631.60 
5011+520.00  2.30  4.59  10.00  45.90  1,273,585.70 
5011+540.00  2.29  4.59  10.00  45.89  1,273,539.81 
5011+560.00  2.30  4.59  10.00  45.89  1,273,493.92 
5011+580.00  2.30  4.59  10.00  45.90  1,273,448.02 
5011+600.00  2.30  4.59  10.00  45.90  1,273,402.12 
5011+620.00  2.30  4.59  10.00  45.90  1,273,356.22 
5011+640.00  2.29  4.59  10.00  45.89  1,273,310.33 
5011+660.00  2.30  4.59  10.00  45.89  1,273,264.44 
5011+680.00  2.30  4.59  10.00  45.90  1,273,218.54 
5011+700.00  2.29  4.59  10.00  45.89  1,273,172.65 
5011+720.00  2.29  4.59  10.00  45.88  1,273,126.77 
5011+740.00  2.30  4.59  10.00  45.89  1,273,080.88 
5011+760.00  2.30  4.59  10.00  45.90  1,273,034.98 
5011+780.00  2.29  4.59  10.00  45.89  1,272,989.09 
5011+800.00  2.30  4.59  10.00  45.89  1,272,943.20 
5011+820.00  2.30  4.59  10.00  45.90  1,272,897.30 
5011+840.00  2.30  4.59  10.00  45.90  1,272,851.40 
5011+860.00  2.30  4.59  10.00  45.90  1,272,805.50 
5011+880.00  2.29  4.59  10.00  45.89  1,272,759.61 
5011+900.00  2.30  4.59  10.00  45.89  1,272,713.72 
5011+920.00  2.30  4.59  10.00  45.90  1,272,667.82 
5011+940.00  2.29  4.59  10.00  45.89  1,272,621.93 
5011+940.00  2.29  4.59  0.00  0.00  1,272,621.93 
5011+960.00  2.29  4.59  10.00  45.88  1,272,576.05 
5011+980.00  2.30  4.59  10.00  45.89  1,272,530.16 
5012+000.00  2.30  4.59  10.00  45.90  1,272,484.26 
5012+000.00  2.30  4.59  0.00  0.00  1,272,484.26 
5012+020.00  2.29  4.59  10.00  45.89  1,272,438.37 
5012+040.00  2.29  4.59  10.00  45.88  1,272,392.49 
5012+060.00  2.30  4.59  10.00  45.89  1,272,346.60 
5012+080.00  2.30  4.59  10.00  45.90  1,272,300.70 
5012+100.00  2.30  4.59  10.00  45.90  1,272,254.80 
5012+120.00  2.30  4.59  10.00  45.90  1,272,208.90 
5012+140.00  2.30  4.59  10.00  45.90  1,272,163.00 
5012+160.00  2.29  4.59  10.00  45.89  1,272,117.11 
5012+180.00  2.30  4.59  10.00  45.89  1,272,071.22 
5012+200.00  2.30  4.59  10.00  45.90  1,272,025.32 
5012+220.00  2.30  4.59  10.00  45.90  1,271,979.42 
5012+240.00  2.29  4.59  10.00  45.89  1,271,933.53 
5012+260.00  2.30  4.59  10.00  45.89  1,271,887.64 
5012+280.00  2.30  4.59  10.00  45.90  1,271,841.74 
5012+300.00  2.30  4.59  10.00  45.90  1,271,795.84 

579 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5012+320.00  2.30  4.59  10.00  45.90  1,271,749.94 


5012+340.00  2.30  4.59  10.00  45.90  1,271,704.04 
5012+360.00  2.30  4.59  10.00  45.90  1,271,658.14 
5012+380.00  2.30  4.59  10.00  45.90  1,271,612.24 
5012+400.00  2.29  4.59  10.00  45.89  1,271,566.35 
5012+420.00  2.29  4.59  10.00  45.88  1,271,520.47 
5012+420.00  2.29  4.59  0.00  0.00  1,271,520.47 
5012+440.00  2.30  4.59  10.00  45.89  1,271,474.58 
5012+460.00  2.30  4.59  10.00  45.90  1,271,428.68 
5012+480.00  2.30  4.59  10.00  45.90  1,271,382.78 
5012+500.00  2.30  4.59  10.00  45.90  1,271,336.88 
5012+520.00  2.30  4.59  10.00  45.90  1,271,290.98 
5012+540.00  2.29  4.59  10.00  45.89  1,271,245.09 
5012+560.00  2.30  4.59  10.00  45.89  1,271,199.20 
5012+580.00  2.30  4.59  10.00  45.90  1,271,153.30 
5012+600.00  2.30  4.59  10.00  45.90  1,271,107.40 
5012+600.00  2.30  4.59  0.00  0.00  1,271,107.40 
5012+620.00  2.30  4.59  10.00  45.90  1,271,061.50 
5012+640.00  2.30  4.59  10.00  45.90  1,271,015.60 
5012+660.00  2.29  4.59  10.00  45.89  1,270,969.71 
5012+680.00  2.29  4.59  10.00  45.88  1,270,923.83 
5012+700.00  2.30  4.59  10.00  45.89  1,270,877.94 
5012+720.00  2.30  4.59  10.00  45.90  1,270,832.04 
5012+740.00  2.30  4.59  10.00  45.90  1,270,786.14 
5012+760.00  2.30  4.59  10.00  45.90  1,270,740.24 
5012+780.00  2.29  4.59  10.00  45.89  1,270,694.35 
5012+800.00  2.29  4.59  10.00  45.88  1,270,648.47 
5012+820.00  2.30  4.59  10.00  45.89  1,270,602.58 
5012+840.00  2.30  4.59  10.00  45.90  1,270,556.68 
5012+860.00  2.30  4.59  10.00  45.90  1,270,510.78 
5012+880.00  2.30  4.59  10.00  45.90  1,270,464.88 
5012+900.00  2.29  4.59  10.00  45.89  1,270,418.99 
5012+920.00  2.29  4.59  10.00  45.88  1,270,373.11 
5012+940.00  2.30  4.59  10.00  45.89  1,270,327.22 
5012+960.00  2.30  4.59  10.00  45.90  1,270,281.32 
5012+980.00  2.30  4.59  10.00  45.90  1,270,235.42 
5013+000.00  2.30  4.59  10.00  45.90  1,270,189.52 
5013+020.00  2.30  4.59  10.00  45.90  1,270,143.62 
5013+040.00  2.29  4.59  10.00  45.89  1,270,097.73 
5013+060.00  2.30  4.59  10.00  45.89  1,270,051.84 
5013+080.00  2.30  4.59  10.00  45.90  1,270,005.94 
5013+100.00  2.30  4.59  10.00  45.90  1,269,960.04 
5013+120.00  2.30  4.59  10.00  45.90  1,269,914.14 
5013+140.00  2.30  4.59  10.00  45.90  1,269,868.24 
5013+160.00  2.29  4.59  10.00  45.89  1,269,822.35 

580 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5013+180.00  2.29  4.59  10.00  45.88  1,269,776.47 


5013+200.00  2.30  4.59  10.00  45.89  1,269,730.58 
5013+220.00  2.30  4.59  10.00  45.90  1,269,684.68 
5013+235.00  2.30  4.59  7.50  34.43  1,269,650.25 
5013+235.00  2.30  4.59  0.00  0.00  1,269,650.25 
5013+240.00  2.29  4.59  2.50  11.47  1,269,638.78 
5013+260.00  2.30  4.59  10.00  45.89  1,269,592.89 
5013+280.00  2.30  4.59  10.00  45.90  1,269,546.99 
5013+300.00  2.30  4.59  10.00  45.90  1,269,501.09 
5013+320.00  2.30  4.59  10.00  45.90  1,269,455.19 
5013+340.00  2.30  4.59  10.00  45.90  1,269,409.29 
5013+360.00  2.30  4.59  10.00  45.90  1,269,363.39 
5013+380.00  2.30  4.59  10.00  45.90  1,269,317.49 
5013+390.00  2.30  4.59  5.00  22.95  1,269,294.54 
5013+390.00  2.30  4.59  0.00  0.00  1,269,294.54 
5013+400.00  2.30  4.59  5.00  22.95  1,269,271.59 
5013+420.00  2.30  4.59  10.00  45.90  1,269,225.69 
5013+440.00  2.29  4.59  10.00  45.89  1,269,179.80 
5013+460.00  2.30  4.59  10.00  45.89  1,269,133.91 
5013+480.00  2.29  4.59  10.00  45.89  1,269,088.02 
5013+500.00  2.30  4.59  10.00  45.89  1,269,042.13 
5013+520.00  2.30  4.59  10.00  45.90  1,268,996.23 
5013+540.00  2.29  4.59  10.00  45.89  1,268,950.34 
5013+560.00  2.30  4.59  10.00  45.89  1,268,904.45 
5013+580.00  2.30  4.59  10.00  45.90  1,268,858.55 
5013+600.00  2.29  4.59  10.00  45.89  1,268,812.66 
5013+620.00  2.30  4.59  10.00  45.89  1,268,766.77 
5013+640.00  2.30  4.59  10.00  45.90  1,268,720.87 
5013+660.00  2.30  4.59  10.00  45.90  1,268,674.97 
5013+680.00  2.30  4.59  10.00  45.90  1,268,629.07 
5013+700.00  2.30  4.59  10.00  45.90  1,268,583.17 
5013+720.00  2.29  4.59  10.00  45.89  1,268,537.28 
5013+740.00  2.29  4.59  10.00  45.88  1,268,491.40 
5013+760.00  2.30  4.59  10.00  45.89  1,268,445.51 
5013+780.00  2.30  4.59  10.00  45.90  1,268,399.61 
5013+800.00  2.30  4.59  10.00  45.90  1,268,353.71 
5013+820.00  2.30  4.59  10.00  45.90  1,268,307.81 
5013+840.00  2.30  4.59  10.00  45.90  1,268,261.91 
5013+860.00  2.30  4.59  10.00  45.90  1,268,216.01 
5013+880.00  2.30  4.59  10.00  45.90  1,268,170.11 
5013+900.00  2.30  4.59  10.00  45.90  1,268,124.21 
5013+920.00  2.30  4.59  10.00  45.90  1,268,078.31 
5013+940.00  2.30  4.59  10.00  45.90  1,268,032.41 
5013+960.00  2.30  4.59  10.00  45.90  1,267,986.51 
5013+980.00  2.30  4.59  10.00  45.90  1,267,940.61 

581 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5014+000.00  2.30  4.59  10.00  45.90  1,267,894.71 


5014+020.00  2.30  4.59  10.00  45.90  1,267,848.81 
5014+040.00  2.30  4.59  10.00  45.90  1,267,802.91 
5014+060.00  2.29  4.59  10.00  45.89  1,267,757.02 
5014+060.00  2.29  4.59  0.00  0.00  1,267,757.02 
5014+080.00  2.30  4.59  10.00  45.89  1,267,711.13 
5014+100.00  2.30  4.59  10.00  45.90  1,267,665.23 
5014+120.00  2.30  4.59  10.00  45.90  1,267,619.33 
5014+140.00  2.30  4.59  10.00  45.90  1,267,573.43 
5014+160.00  2.29  4.59  10.00  45.89  1,267,527.54 
5014+180.00  2.30  4.59  10.00  45.89  1,267,481.65 
5014+200.00  2.30  4.59  10.00  45.90  1,267,435.75 
5014+220.00  2.30  4.59  10.00  45.90  1,267,389.85 
5014+240.00  2.30  4.59  10.00  45.90  1,267,343.95 
5014+260.00  2.30  4.59  10.00  45.90  1,267,298.05 
5014+280.00  2.29  4.59  10.00  45.89  1,267,252.16 
5014+300.00  2.29  4.59  10.00  45.88  1,267,206.28 
5014+320.00  2.29  4.59  10.00  45.88  1,267,160.40 
5014+340.00  2.29  4.59  10.00  45.88  1,267,114.52 
5014+360.00  2.30  4.59  10.00  45.89  1,267,068.63 
5014+380.00  2.30  4.59  10.00  45.90  1,267,022.73 
5014+400.00  2.30  4.59  10.00  45.90  1,266,976.83 
5014+420.00  2.30  4.59  10.00  45.90  1,266,930.93 
5014+440.00  2.29  4.59  10.00  45.89  1,266,885.04 
5014+460.00  2.30  4.59  10.00  45.89  1,266,839.15 
5014+480.00  2.30  4.59  10.00  45.90  1,266,793.25 
5014+500.00  2.30  4.59  10.00  45.90  1,266,747.35 
5014+520.00  2.30  4.59  10.00  45.90  1,266,701.45 
5014+540.00  2.29  4.59  10.00  45.89  1,266,655.56 
5014+560.00  2.30  4.59  10.00  45.89  1,266,609.67 
5014+580.00  2.29  4.59  10.00  45.89  1,266,563.78 
5014+600.00  2.30  4.59  10.00  45.89  1,266,517.89 
5014+620.00  2.29  4.59  10.00  45.89  1,266,472.00 
5014+640.00  2.30  4.59  10.00  45.89  1,266,426.11 
5014+660.00  2.29  4.59  10.00  45.89  1,266,380.22 
5014+680.00  2.30  4.59  10.00  45.89  1,266,334.33 
5014+700.00  2.30  4.59  10.00  45.90  1,266,288.43 
5014+720.00  2.30  4.59  10.00  45.90  1,266,242.53 
5014+740.00  2.30  4.59  10.00  45.90  1,266,196.63 
5014+760.00  2.29  4.59  10.00  45.89  1,266,150.74 
5014+780.00  2.30  4.59  10.00  45.89  1,266,104.85 
5014+800.00  2.30  4.59  10.00  45.90  1,266,058.95 
5014+820.00  2.29  4.59  10.00  45.89  1,266,013.06 
5014+840.00  2.30  4.59  10.00  45.89  1,265,967.17 
5014+860.00  2.29  4.59  10.00  45.89  1,265,921.28 

582 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5014+880.00  2.30  4.59  10.00  45.89  1,265,875.39 


5014+900.00  2.29  4.59  10.00  45.89  1,265,829.50 
5014+920.00  2.30  4.59  10.00  45.89  1,265,783.61 
5014+940.00  2.30  4.59  10.00  45.90  1,265,737.71 
5014+960.00  2.30  4.59  10.00  45.90  1,265,691.81 
5014+980.00  2.30  4.59  10.00  45.90  1,265,645.91 
5015+000.00  2.30  4.59  10.00  45.90  1,265,600.01 
5015+020.00  2.30  4.59  10.00  45.90  1,265,554.11 
5015+040.00  2.30  4.59  10.00  45.90  1,265,508.21 
5015+060.00  2.30  4.59  10.00  45.90  1,265,462.31 
5015+080.00  2.29  4.59  10.00  45.89  1,265,416.42 
5015+100.00  2.30  4.59  10.00  45.89  1,265,370.53 
5015+120.00  2.30  4.59  10.00  45.90  1,265,324.63 
5015+140.00  2.29  4.59  10.00  45.89  1,265,278.74 
5015+160.00  2.30  4.59  10.00  45.89  1,265,232.85 
5015+180.00  2.30  4.59  10.00  45.90  1,265,186.95 
5015+200.00  2.29  4.59  10.00  45.89  1,265,141.06 
5015+220.00  2.30  4.59  10.00  45.89  1,265,095.17 
5015+240.00  2.30  4.59  10.00  45.90  1,265,049.27 
5015+260.00  2.29  4.59  10.00  45.89  1,265,003.38 
5015+280.00  2.30  4.59  10.00  45.89  1,264,957.49 
5015+300.00  2.30  4.59  10.00  45.90  1,264,911.59 
5015+320.00  2.30  4.59  10.00  45.90  1,264,865.69 
5015+340.00  2.29  4.59  10.00  45.89  1,264,819.80 
5015+360.00  2.30  4.59  10.00  45.89  1,264,773.91 
5015+380.00  2.30  4.59  10.00  45.90  1,264,728.01 
5015+400.00  2.29  4.59  10.00  45.89  1,264,682.12 
5015+420.00  2.30  4.59  10.00  45.89  1,264,636.23 
5015+440.00  2.30  4.59  10.00  45.90  1,264,590.33 
5015+460.00  2.29  4.59  10.00  45.89  1,264,544.44 
5015+480.00  2.30  4.59  10.00  45.89  1,264,498.55 
5015+500.00  2.29  4.59  10.00  45.89  1,264,452.66 
5015+520.00  2.29  4.59  10.00  45.88  1,264,406.78 
5015+540.00  2.30  4.59  10.00  45.89  1,264,360.89 
5015+560.00  2.30  4.59  10.00  45.90  1,264,314.99 
5015+580.00  2.29  4.59  10.00  45.89  1,264,269.10 
5015+600.00  2.30  4.59  10.00  45.89  1,264,223.21 
5015+620.00  2.30  4.59  10.00  45.90  1,264,177.31 
5015+640.00  2.29  4.59  10.00  45.89  1,264,131.42 
5015+660.00  2.30  4.59  10.00  45.89  1,264,085.53 
5015+680.00  2.30  4.59  10.00  45.90  1,264,039.63 
5015+700.00  2.30  4.59  10.00  45.90  1,263,993.73 
5015+720.00  2.29  4.59  10.00  45.89  1,263,947.84 
5015+740.00  2.30  4.59  10.00  45.89  1,263,901.95 
5015+760.00  2.29  4.59  10.00  45.89  1,263,856.06 

583 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5015+780.00  2.30  4.59  10.00  45.89  1,263,810.17 


5015+800.00  2.29  4.59  10.00  45.89  1,263,764.28 
5015+820.00  2.30  4.59  10.00  45.89  1,263,718.39 
5015+830.00  2.30  4.59  5.00  22.95  1,263,695.44 
5015+830.00  2.30  4.59  0.00  0.00  1,263,695.44 
5015+840.00  2.30  4.59  5.00  22.95  1,263,672.49 
5015+860.00  2.30  4.59  10.00  45.90  1,263,626.59 
5015+880.00  2.30  4.59  10.00  45.90  1,263,580.69 
5015+900.00  2.29  4.59  10.00  45.89  1,263,534.80 
5015+920.00  2.30  4.59  10.00  45.89  1,263,488.91 
5015+940.00  2.29  4.59  10.00  45.89  1,263,443.02 
5015+960.00  2.30  4.59  10.00  45.89  1,263,397.13 
5015+980.00  2.29  4.59  10.00  45.89  1,263,351.24 
5016+000.00  2.30  4.59  10.00  45.89  1,263,305.35 
5016+020.00  2.30  4.59  10.00  45.90  1,263,259.45 
5016+040.00  2.30  4.59  10.00  45.90  1,263,213.55 
5016+060.00  2.30  4.59  10.00  45.90  1,263,167.65 
5016+080.00  2.30  4.59  10.00  45.90  1,263,121.75 
5016+100.00  2.30  4.59  10.00  45.90  1,263,075.85 
5016+120.00  2.30  4.59  10.00  45.90  1,263,029.95 
5016+140.00  2.30  4.59  10.00  45.90  1,262,984.05 
5016+160.00  2.30  4.59  10.00  45.90  1,262,938.15 
5016+180.00  2.29  4.59  10.00  45.89  1,262,892.26 
5016+200.00  2.30  4.59  10.00  45.89  1,262,846.37 
5016+220.00  2.30  4.59  10.00  45.90  1,262,800.47 
5016+240.00  2.29  4.59  10.00  45.89  1,262,754.58 
5016+260.00  2.30  4.59  10.00  45.89  1,262,708.69 
5016+280.00  2.30  4.59  10.00  45.90  1,262,662.79 
5016+300.00  2.30  4.59  10.00  45.90  1,262,616.89 
5016+320.00  2.30  4.59  10.00  45.90  1,262,570.99 
5016+340.00  2.30  4.59  10.00  45.90  1,262,525.09 
5016+360.00  2.30  4.59  10.00  45.90  1,262,479.19 
5016+380.00  2.29  4.59  10.00  45.89  1,262,433.30 
5016+400.00  2.30  4.59  10.00  45.89  1,262,387.41 
5016+420.00  2.30  4.59  10.00  45.90  1,262,341.51 
5016+440.00  2.30  4.59  10.00  45.90  1,262,295.61 
5016+460.00  2.30  4.59  10.00  45.90  1,262,249.71 
5016+480.00  2.30  4.59  10.00  45.90  1,262,203.81 
5016+500.00  2.30  4.59  10.00  45.90  1,262,157.91 
5016+520.00  2.29  4.59  10.00  45.89  1,262,112.02 
5016+520.00  2.29  4.59  0.00  0.00  1,262,112.02 
5016+540.00  2.30  4.59  10.00  45.89  1,262,066.13 
5016+560.00  2.29  4.59  10.00  45.89  1,262,020.24 
5016+580.00  2.30  4.59  10.00  45.89  1,261,974.35 
5016+600.00  2.30  4.59  10.00  45.90  1,261,928.45 

584 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5016+600.00  2.30  4.59  0.00  0.00  1,261,928.45 


5016+620.00  2.30  4.59  10.00  45.90  1,261,882.55 
5016+640.00  2.30  4.59  10.00  45.90  1,261,836.65 
5016+660.00  2.30  4.59  10.00  45.90  1,261,790.75 
5016+680.00  2.30  4.59  10.00  45.90  1,261,744.85 
5016+700.00  2.30  4.59  10.00  45.90  1,261,698.95 
5016+720.00  2.30  4.59  10.00  45.90  1,261,653.05 
5016+740.00  2.30  4.59  10.00  45.90  1,261,607.15 
5016+760.00  2.29  4.59  10.00  45.89  1,261,561.26 
5016+780.00  2.30  4.59  10.00  45.89  1,261,515.37 
5016+800.00  2.30  4.59  10.00  45.90  1,261,469.47 
5016+820.00  2.30  4.59  10.00  45.90  1,261,423.57 
5016+840.00  2.29  4.59  10.00  45.89  1,261,377.68 
5016+860.00  2.29  4.59  10.00  45.88  1,261,331.80 
5016+880.00  2.30  4.59  10.00  45.89  1,261,285.91 
5016+900.00  2.30  4.59  10.00  45.90  1,261,240.01 
5016+920.00  2.29  4.59  10.00  45.89  1,261,194.12 
5016+940.00  2.29  4.59  10.00  45.88  1,261,148.24 
5016+960.00  2.30  4.59  10.00  45.89  1,261,102.35 
5016+980.00  2.29  4.59  10.00  45.89  1,261,056.46 
5017+000.00  2.30  4.59  10.00  45.89  1,261,010.57 
5017+020.00  2.30  4.59  10.00  45.90  1,260,964.67 
5017+040.00  2.30  4.59  10.00  45.90  1,260,918.77 
5017+060.00  2.29  4.59  10.00  45.89  1,260,872.88 
5017+080.00  2.30  4.59  10.00  45.89  1,260,826.99 
5017+100.00  2.29  4.59  10.00  45.89  1,260,781.10 
5017+120.00  2.30  4.59  10.00  45.89  1,260,735.21 
5017+140.00  2.30  4.59  10.00  45.90  1,260,689.31 
5017+160.00  2.29  4.59  10.00  45.89  1,260,643.42 
5017+180.00  2.30  4.59  10.00  45.89  1,260,597.53 
5017+200.00  2.30  4.59  10.00  45.90  1,260,551.63 
5017+220.00  2.29  4.59  10.00  45.89  1,260,505.74 
5017+240.00  2.29  4.59  10.00  45.88  1,260,459.86 
5017+260.00  2.30  4.59  10.00  45.89  1,260,413.97 
5017+280.00  2.30  4.59  10.00  45.90  1,260,368.07 
5017+300.00  2.29  4.59  10.00  45.89  1,260,322.18 
5017+320.00  2.30  4.59  10.00  45.89  1,260,276.29 
5017+340.00  2.30  4.59  10.00  45.90  1,260,230.39 
5017+340.00  2.30  4.59  0.00  0.00  1,260,230.39 
5017+360.00  2.29  4.59  10.00  45.89  1,260,184.50 
5017+380.00  2.30  4.59  10.00  45.89  1,260,138.61 
5017+400.00  2.30  4.59  10.00  45.90  1,260,092.71 
5017+420.00  2.30  4.59  10.00  45.90  1,260,046.81 
5017+440.00  2.29  4.59  10.00  45.89  1,260,000.92 
5017+460.00  2.30  4.59  10.00  45.89  1,259,955.03 

585 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5017+480.00  2.30  4.59  10.00  45.90  1,259,909.13 


5017+500.00  2.29  4.59  10.00  45.89  1,259,863.24 
5017+520.00  2.30  4.59  10.00  45.89  1,259,817.35 
5017+540.00  2.30  4.59  10.00  45.90  1,259,771.45 
5017+560.00  2.30  4.59  10.00  45.90  1,259,725.55 
5017+563.95  2.30  4.59  1.97  9.05  1,259,716.50 
5017+580.00  2.30  4.59  8.03  36.85  1,259,679.65 
5017+593.95  2.29  4.59  6.97  32.00  1,259,647.65 
5017+600.00  2.30  4.59  3.03  13.89  1,259,633.76 
5017+620.00  2.30  4.59  10.00  45.90  1,259,587.86 
5017+640.00  2.30  4.59  10.00  45.90  1,259,541.96 
5017+660.00  2.30  4.59  10.00  45.90  1,259,496.06 
5017+678.40  2.30  4.59  9.20  42.23  1,259,453.83 
5017+680.00  2.30  4.59  0.80  3.67  1,259,450.16 
5017+680.00  2.30  4.59  0.00  0.00  1,259,450.16 
5017+700.00  2.30  4.59  10.00  45.90  1,259,404.26 
5017+708.40  2.29  4.59  4.20  19.27  1,259,384.99 
5017+720.00  2.30  4.59  5.80  26.62  1,259,358.37 
5017+740.00  2.29  4.59  10.00  45.89  1,259,312.48 
5017+760.00  2.30  4.59  10.00  45.89  1,259,266.59 
5017+780.00  2.29  4.59  10.00  45.89  1,259,220.70 
5017+800.00  2.30  4.59  10.00  45.89  1,259,174.81 
5017+820.00  2.29  4.59  10.00  45.89  1,259,128.92 
5017+840.00  2.30  4.59  10.00  45.89  1,259,083.03 
5017+860.00  2.30  4.59  10.00  45.90  1,259,037.13 
5017+880.00  2.30  4.59  10.00  45.90  1,258,991.23 
5017+900.00  2.30  4.59  10.00  45.90  1,258,945.33 
5017+920.00  2.29  4.59  10.00  45.89  1,258,899.44 
5017+940.00  2.30  4.59  10.00  45.89  1,258,853.55 
5017+960.00  2.30  4.59  10.00  45.90  1,258,807.65 
5017+980.00  2.30  4.59  10.00  45.90  1,258,761.75 
5018+000.00  2.29  4.59  10.00  45.89  1,258,715.86 
5018+020.00  2.30  4.59  10.00  45.89  1,258,669.97 
5018+040.00  2.29  4.59  10.00  45.89  1,258,624.08 
5018+040.00  2.29  4.59  0.00  0.00  1,258,624.08 
5018+060.00  2.30  4.59  10.00  45.89  1,258,578.19 
5018+080.00  2.30  4.59  10.00  45.90  1,258,532.29 
5018+100.00  2.29  4.59  10.00  45.89  1,258,486.40 
5018+120.00  2.29  4.59  10.00  45.88  1,258,440.52 
5018+140.00  2.30  4.59  10.00  45.89  1,258,394.63 
5018+160.00  2.30  4.59  10.00  45.90  1,258,348.73 
5018+180.00  2.30  4.59  10.00  45.90  1,258,302.83 
5018+200.00  2.29  4.59  10.00  45.89  1,258,256.94 
5018+220.00  2.30  4.59  10.00  45.89  1,258,211.05 
5018+240.00  2.30  4.59  10.00  45.90  1,258,165.15 

586 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5018+260.00  2.30  4.59  10.00  45.90  1,258,119.25 


5018+280.00  2.29  4.59  10.00  45.89  1,258,073.36 
5018+300.00  2.30  4.59  10.00  45.89  1,258,027.47 
5018+320.00  2.29  4.59  10.00  45.89  1,257,981.58 
5018+340.00  2.30  4.59  10.00  45.89  1,257,935.69 
5018+360.00  2.30  4.59  10.00  45.90  1,257,889.79 
5018+380.00  2.29  4.59  10.00  45.89  1,257,843.90 
5018+400.00  2.30  4.59  10.00  45.89  1,257,798.01 
5018+420.00  2.29  4.59  10.00  45.89  1,257,752.12 
5018+440.00  2.30  4.59  10.00  45.89  1,257,706.23 
5018+460.00  2.30  4.59  10.00  45.90  1,257,660.33 
5018+480.00  2.30  4.59  10.00  45.90  1,257,614.43 
5018+500.00  2.30  4.59  10.00  45.90  1,257,568.53 
5018+520.00  2.30  4.59  10.00  45.90  1,257,522.63 
5018+540.00  2.29  4.59  10.00  45.89  1,257,476.74 
5018+560.00  2.30  4.59  10.00  45.89  1,257,430.85 
5018+580.00  2.29  4.59  10.00  45.89  1,257,384.96 
5018+600.00  2.30  4.59  10.00  45.89  1,257,339.07 
5018+620.00  2.29  4.59  10.00  45.89  1,257,293.18 
5018+640.00  2.30  4.59  10.00  45.89  1,257,247.29 
5018+660.00  2.29  4.59  10.00  45.89  1,257,201.40 
5018+680.00  2.30  4.59  10.00  45.89  1,257,155.51 
5018+700.00  2.30  4.59  10.00  45.90  1,257,109.61 
5018+720.00  2.30  4.59  10.00  45.90  1,257,063.71 
5018+740.00  2.30  4.59  10.00  45.90  1,257,017.81 
5018+760.00  2.30  4.59  10.00  45.90  1,256,971.91 
5018+780.00  2.29  4.59  10.00  45.89  1,256,926.02 
5018+800.00  2.30  4.59  10.00  45.89  1,256,880.13 
5018+820.00  2.30  4.59  10.00  45.90  1,256,834.23 
5018+840.00  2.29  4.59  10.00  45.89  1,256,788.34 
5018+860.00  2.30  4.59  10.00  45.89  1,256,742.45 
5018+880.00  2.29  4.59  10.00  45.89  1,256,696.56 
5018+900.00  2.29  4.59  10.00  45.88  1,256,650.68 
5018+920.00  2.30  4.59  10.00  45.89  1,256,604.79 
5018+939.87  2.30  4.59  9.93  45.59  1,256,559.20 
5018+940.00  2.30  4.59  0.07  0.31  1,256,558.89 
5018+960.00  2.27  4.56  10.00  45.62  1,256,513.27 
5018+979.87  2.24  4.51  9.93  44.77  1,256,468.50 
5018+980.00  2.24  4.48  0.07  0.30  1,256,468.20 
5019+000.00  2.24  4.48  10.00  44.80  1,256,423.40 
5019+020.00  2.24  4.48  10.00  44.80  1,256,378.60 
5019+040.00  2.24  4.48  10.00  44.80  1,256,333.80 
5019+060.00  2.24  4.48  10.00  44.80  1,256,289.00 
5019+062.97  2.24  4.48  1.48  6.65  1,256,282.36 
5019+080.00  2.26  4.50  8.52  38.35  1,256,244.01 

587 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5019+100.00  2.29  4.55  10.00  45.54  1,256,198.47 


5019+102.97  2.29  4.59  1.48  6.80  1,256,191.67 
5019+120.00  2.29  4.59  8.52  39.07  1,256,152.59 
5019+140.00  2.30  4.59  10.00  45.89  1,256,106.70 
5019+160.00  2.30  4.59  10.00  45.90  1,256,060.80 
5019+180.00  2.30  4.59  10.00  45.90  1,256,014.90 
5019+200.00  2.29  4.59  10.00  45.89  1,255,969.01 
5019+220.00  2.30  4.59  10.00  45.89  1,255,923.12 
5019+240.00  2.30  4.59  10.00  45.90  1,255,877.22 
5019+260.00  2.30  4.59  10.00  45.90  1,255,831.32 
5019+280.00  2.30  4.59  10.00  45.90  1,255,785.42 
5019+300.00  2.30  4.59  10.00  45.90  1,255,739.52 
5019+320.00  2.29  4.59  10.00  45.89  1,255,693.63 
5019+340.00  2.29  4.59  10.00  45.88  1,255,647.75 
5019+360.00  2.30  4.59  10.00  45.89  1,255,601.86 
5019+380.00  2.29  4.59  10.00  45.89  1,255,555.97 
5019+400.00  2.30  4.59  10.00  45.89  1,255,510.08 
5019+420.00  2.29  4.59  10.00  45.89  1,255,464.19 
5019+440.00  2.29  4.59  10.00  45.88  1,255,418.31 
5019+450.00  2.30  4.59  5.00  22.95  1,255,395.37 
5019+450.00  2.30  4.59  0.00  0.00  1,255,395.37 
5019+450.00  2.51  4.80  0.00  0.00  1,255,395.36 
5019+460.00  2.51  5.02  5.00  25.08  1,255,370.29 
5019+478.00  2.51  5.02  9.00  45.14  1,255,325.14 
5019+478.00  2.51  5.02  0.00  0.00  1,255,325.14 
5019+478.00  2.30  4.80  0.00  0.00  1,255,325.14 
5019+480.00  2.30  4.59  1.00  4.59  1,255,320.55 
5019+500.00  2.29  4.59  10.00  45.89  1,255,274.66 
5019+520.00  2.29  4.59  10.00  45.88  1,255,228.78 
5019+540.00  2.30  4.59  10.00  45.89  1,255,182.89 
5019+560.00  2.30  4.59  10.00  45.90  1,255,136.99 
5019+580.00  2.30  4.59  10.00  45.90  1,255,091.09 
5019+600.00  2.30  4.59  10.00  45.90  1,255,045.19 
5019+620.00  2.30  4.59  10.00  45.90  1,254,999.29 
5019+640.00  2.29  4.59  10.00  45.89  1,254,953.40 
5019+660.00  2.29  4.59  10.00  45.88  1,254,907.52 
5019+680.00  2.30  4.59  10.00  45.89  1,254,861.63 
5019+700.00  2.30  4.59  10.00  45.90  1,254,815.73 
5019+700.00  2.30  4.59  0.00  0.00  1,254,815.73 
5019+720.00  2.30  4.59  10.00  45.90  1,254,769.83 
5019+740.00  2.30  4.59  10.00  45.90  1,254,723.93 
5019+760.00  2.30  4.59  10.00  45.90  1,254,678.03 
5019+780.00  2.29  4.59  10.00  45.89  1,254,632.14 
5019+800.00  2.29  4.59  10.00  45.88  1,254,586.26 
5019+820.00  2.30  4.59  10.00  45.89  1,254,540.37 

588 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5019+840.00  2.30  4.59  10.00  45.90  1,254,494.47 


5019+860.00  2.30  4.59  10.00  45.90  1,254,448.57 
5019+880.00  2.30  4.59  10.00  45.90  1,254,402.67 
5019+900.00  2.29  4.59  10.00  45.89  1,254,356.78 
5019+920.00  2.30  4.59  10.00  45.89  1,254,310.89 
5019+940.00  2.29  4.59  10.00  45.89  1,254,265.00 
5019+960.00  2.30  4.59  10.00  45.89  1,254,219.11 
5019+980.00  2.30  4.59  10.00  45.90  1,254,173.21 
5020+000.00  2.29  4.59  10.00  45.89  1,254,127.32 
5020+020.00  2.30  4.59  10.00  45.89  1,254,081.43 
5020+040.00  2.30  4.59  10.00  45.90  1,254,035.53 
5020+060.00  2.30  4.59  10.00  45.90  1,253,989.63 
5020+080.00  2.30  4.59  10.00  45.90  1,253,943.73 
5020+100.00  2.30  4.59  10.00  45.90  1,253,897.83 
5020+120.00  2.30  4.59  10.00  45.90  1,253,851.93 
5020+140.00  2.30  4.59  10.00  45.90  1,253,806.03 
5020+160.00  2.30  4.59  10.00  45.90  1,253,760.13 
5020+180.00  2.30  4.59  10.00  45.90  1,253,714.23 
5020+200.00  2.30  4.59  10.00  45.90  1,253,668.33 
5020+220.00  2.29  4.59  10.00  45.89  1,253,622.44 
5020+240.00  2.29  4.59  10.00  45.88  1,253,576.56 
5020+260.00  2.29  4.59  10.00  45.88  1,253,530.68 
5020+280.00  2.29  4.59  10.00  45.88  1,253,484.80 
5020+300.00  2.29  4.59  10.00  45.88  1,253,438.92 
5020+320.00  2.29  4.59  10.00  45.88  1,253,393.04 
5020+340.00  2.29  4.59  10.00  45.88  1,253,347.16 
5020+360.00  2.29  4.59  10.00  45.88  1,253,301.28 
5020+380.00  2.29  4.59  10.00  45.88  1,253,255.40 
5020+400.00  2.30  4.59  10.00  45.89  1,253,209.51 
5020+420.00  2.29  4.59  10.00  45.89  1,253,163.62 
5020+440.00  2.29  4.59  10.00  45.88  1,253,117.74 
5020+460.00  2.29  4.59  10.00  45.88  1,253,071.86 
5020+480.00  2.29  4.59  10.00  45.88  1,253,025.98 
5020+500.00  2.29  4.59  10.00  45.88  1,252,980.10 
5020+520.00  2.30  4.59  10.00  45.89  1,252,934.21 
5020+540.00  2.30  4.59  10.00  45.90  1,252,888.31 
5020+560.00  2.30  4.59  10.00  45.90  1,252,842.41 
5020+580.00  2.29  4.59  10.00  45.89  1,252,796.52 
5020+600.00  2.30  4.59  10.00  45.89  1,252,750.63 
5020+620.00  2.30  4.59  10.00  45.90  1,252,704.73 
5020+640.00  2.29  4.59  10.00  45.89  1,252,658.84 
5020+660.00  2.30  4.59  10.00  45.89  1,252,612.95 
5020+680.00  2.30  4.59  10.00  45.90  1,252,567.05 
5020+700.00  2.30  4.59  10.00  45.90  1,252,521.15 
5020+720.00  2.29  4.59  10.00  45.89  1,252,475.26 

589 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5020+740.00  2.30  4.59  10.00  45.89  1,252,429.37 


5020+760.00  2.30  4.59  10.00  45.90  1,252,383.47 
5020+780.00  2.29  4.59  10.00  45.89  1,252,337.58 
5020+800.00  2.30  4.59  10.00  45.89  1,252,291.69 
5020+820.00  2.30  4.59  10.00  45.90  1,252,245.79 
5020+840.00  2.30  4.59  10.00  45.90  1,252,199.89 
5020+860.00  2.30  4.59  10.00  45.90  1,252,153.99 
5020+880.00  2.29  4.59  10.00  45.89  1,252,108.10 
5020+900.00  2.30  4.59  10.00  45.89  1,252,062.21 
5020+920.00  2.30  4.59  10.00  45.90  1,252,016.31 
5020+940.00  2.30  4.59  10.00  45.90  1,251,970.41 
5020+960.00  2.30  4.59  10.00  45.90  1,251,924.51 
5020+980.00  2.29  4.59  10.00  45.89  1,251,878.62 
5021+000.00  2.30  4.59  10.00  45.89  1,251,832.73 
5021+020.00  2.30  4.59  10.00  45.90  1,251,786.83 
5021+040.00  2.30  4.59  10.00  45.90  1,251,740.93 
5021+060.00  2.30  4.59  10.00  45.90  1,251,695.03 
5021+080.00  2.29  4.59  10.00  45.89  1,251,649.14 
5021+100.00  2.30  4.59  10.00  45.89  1,251,603.25 
5021+120.00  2.29  4.59  10.00  45.89  1,251,557.36 
5021+140.00  2.30  4.59  10.00  45.89  1,251,511.47 
5021+160.00  2.29  4.59  10.00  45.89  1,251,465.58 
5021+180.00  2.30  4.59  10.00  45.89  1,251,419.69 
5021+200.00  2.29  4.59  10.00  45.89  1,251,373.80 
5021+220.00  2.30  4.59  10.00  45.89  1,251,327.91 
5021+240.00  2.30  4.59  10.00  45.90  1,251,282.01 
5021+260.00  2.30  4.59  10.00  45.90  1,251,236.11 
5021+280.00  2.30  4.59  10.00  45.90  1,251,190.21 
5021+300.00  2.30  4.59  10.00  45.90  1,251,144.31 
5021+320.00  2.30  4.59  10.00  45.90  1,251,098.41 
5021+340.00  2.29  4.59  10.00  45.89  1,251,052.52 
5021+360.00  2.29  4.59  10.00  45.88  1,251,006.64 
5021+380.00  2.29  4.59  10.00  45.88  1,250,960.76 
5021+400.00  2.30  4.59  10.00  45.89  1,250,914.87 
5021+420.00  2.29  4.59  10.00  45.89  1,250,868.98 
5021+440.00  2.30  4.59  10.00  45.89  1,250,823.09 
5021+460.00  2.30  4.59  10.00  45.90  1,250,777.19 
5021+480.00  2.29  4.59  10.00  45.89  1,250,731.30 
5021+500.00  2.30  4.59  10.00  45.89  1,250,685.41 
5021+520.00  2.30  4.59  10.00  45.90  1,250,639.51 
5021+540.00  2.30  4.59  10.00  45.90  1,250,593.61 
5021+560.00  2.30  4.59  10.00  45.90  1,250,547.71 
5021+560.00  2.30  4.59  0.00  0.00  1,250,547.71 
5021+580.00  2.30  4.59  10.00  45.90  1,250,501.81 
5021+600.00  2.29  4.59  10.00  45.89  1,250,455.92 

590 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5021+620.00  2.30  4.59  10.00  45.89  1,250,410.03 


5021+640.00  2.30  4.59  10.00  45.90  1,250,364.13 
5021+660.00  2.30  4.59  10.00  45.90  1,250,318.23 
5021+680.00  2.30  4.59  10.00  45.90  1,250,272.33 
5021+700.00  2.30  4.59  10.00  45.90  1,250,226.43 
5021+720.00  2.29  4.59  10.00  45.89  1,250,180.54 
5021+740.00  2.29  4.59  10.00  45.88  1,250,134.66 
5021+760.00  2.29  4.59  10.00  45.88  1,250,088.78 
5021+780.00  2.29  4.59  10.00  45.88  1,250,042.90 
5021+800.00  2.29  4.59  10.00  45.88  1,249,997.02 
5021+820.00  2.30  4.59  10.00  45.89  1,249,951.13 
5021+840.00  2.30  4.59  10.00  45.90  1,249,905.23 
5021+860.00  2.30  4.59  10.00  45.90  1,249,859.33 
5021+880.00  2.30  4.59  10.00  45.90  1,249,813.43 
5021+900.00  2.30  4.59  10.00  45.90  1,249,767.53 
5021+920.00  2.30  4.59  10.00  45.90  1,249,721.63 
5021+920.00  2.30  4.59  0.00  0.00  1,249,721.63 
5021+940.00  2.30  4.59  10.00  45.90  1,249,675.73 
5021+960.00  2.30  4.59  10.00  45.90  1,249,629.83 
5021+980.00  2.30  4.59  10.00  45.90  1,249,583.93 
5022+000.00  2.30  4.59  10.00  45.90  1,249,538.03 
5022+020.00  2.30  4.59  10.00  45.90  1,249,492.13 
5022+040.00  2.30  4.59  10.00  45.90  1,249,446.23 
5022+060.00  2.30  4.59  10.00  45.90  1,249,400.33 
5022+080.00  2.29  4.59  10.00  45.89  1,249,354.44 
5022+100.00  2.29  4.59  10.00  45.88  1,249,308.56 
5022+120.00  2.29  4.59  10.00  45.88  1,249,262.68 
5022+140.00  2.29  4.59  10.00  45.88  1,249,216.80 
5022+160.00  2.29  4.59  10.00  45.88  1,249,170.92 
5022+180.00  2.29  4.59  10.00  45.88  1,249,125.04 
5022+200.00  2.30  4.59  10.00  45.89  1,249,079.15 
5022+220.00  2.30  4.59  10.00  45.90  1,249,033.25 
5022+240.00  2.29  4.59  10.00  45.89  1,248,987.36 
5022+260.00  2.30  4.59  10.00  45.89  1,248,941.47 
5022+280.00  2.30  4.59  10.00  45.90  1,248,895.57 
5022+280.00  2.30  4.59  0.00  0.00  1,248,895.57 
5022+300.00  2.29  4.59  10.00  45.89  1,248,849.68 
5022+320.00  2.30  4.59  10.00  45.89  1,248,803.79 
5022+340.00  2.30  4.59  10.00  45.90  1,248,757.89 
5022+360.00  2.30  4.59  10.00  45.90  1,248,711.99 
5022+380.00  2.29  4.59  10.00  45.89  1,248,666.10 
5022+400.00  2.30  4.59  10.00  45.89  1,248,620.21 
5022+420.00  2.30  4.59  10.00  45.90  1,248,574.31 
5022+440.00  2.30  4.59  10.00  45.90  1,248,528.41 
5022+460.00  2.30  4.59  10.00  45.90  1,248,482.51 

591 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5022+480.00  2.29  4.59  10.00  45.89  1,248,436.62 


5022+490.00  2.30  4.59  5.00  22.95  1,248,413.68 
5022+490.00  2.30  4.59  0.00  0.00  1,248,413.68 
5022+500.00  2.30  4.59  5.00  22.95  1,248,390.73 
5022+520.00  2.30  4.59  10.00  45.90  1,248,344.83 
5022+540.00  2.30  4.59  10.00  45.90  1,248,298.93 
5022+560.00  2.29  4.59  10.00  45.89  1,248,253.04 
5022+580.00  2.30  4.59  10.00  45.89  1,248,207.15 
5022+600.00  2.29  4.59  10.00  45.89  1,248,161.26 
5022+620.00  2.30  4.59  10.00  45.89  1,248,115.37 
5022+640.00  2.29  4.59  10.00  45.89  1,248,069.48 
5022+660.00  2.30  4.59  10.00  45.89  1,248,023.59 
5022+680.00  2.29  4.59  10.00  45.89  1,247,977.70 
5022+685.75  2.29  4.59  2.87  13.18  1,247,964.52 
5022+700.00  2.30  4.59  7.13  32.71  1,247,931.81 
5022+715.75  2.30  4.59  7.87  36.13  1,247,895.68 
5022+720.00  2.29  4.59  2.13  9.76  1,247,885.91 
5022+740.00  2.30  4.59  10.00  45.89  1,247,840.02 
5022+760.00  2.29  4.59  10.00  45.89  1,247,794.13 
5022+780.00  2.30  4.59  10.00  45.89  1,247,748.24 
5022+800.00  2.29  4.59  10.00  45.89  1,247,702.35 
5022+800.10  2.30  4.59  0.05  0.23  1,247,702.12 
5022+820.00  2.30  4.59  9.95  45.67  1,247,656.45 
5022+830.10  2.30  4.59  5.05  23.18  1,247,633.27 
5022+840.00  2.29  4.59  4.95  22.71  1,247,610.56 
5022+860.00  2.30  4.59  10.00  45.89  1,247,564.67 
5022+880.00  2.29  4.59  10.00  45.89  1,247,518.78 
5022+900.00  2.30  4.59  10.00  45.89  1,247,472.89 
5022+920.00  2.29  4.59  10.00  45.89  1,247,427.00 
5022+940.00  2.30  4.59  10.00  45.89  1,247,381.11 
5022+960.00  2.29  4.59  10.00  45.89  1,247,335.22 
5022+980.00  2.30  4.59  10.00  45.89  1,247,289.33 
5023+000.00  2.29  4.59  10.00  45.89  1,247,243.44 
5023+020.00  2.30  4.59  10.00  45.89  1,247,197.55 
5023+040.00  2.29  4.59  10.00  45.89  1,247,151.66 
5023+060.00  2.30  4.59  10.00  45.89  1,247,105.77 
5023+080.00  2.29  4.59  10.00  45.89  1,247,059.88 
5023+100.00  2.30  4.59  10.00  45.89  1,247,013.99 
5023+100.00  2.30  4.59  0.00  0.00  1,247,013.99 
5023+120.00  2.30  4.59  10.00  45.90  1,246,968.09 
5023+140.00  2.30  4.59  10.00  45.90  1,246,922.19 
5023+160.00  2.30  4.59  10.00  45.90  1,246,876.29 
5023+180.00  2.30  4.59  10.00  45.90  1,246,830.39 
5023+200.00  2.30  4.59  10.00  45.90  1,246,784.49 
5023+220.00  2.30  4.59  10.00  45.90  1,246,738.59 

592 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5023+220.00  2.30  4.59  0.00  0.00  1,246,738.59 


5023+240.00  2.30  4.59  10.00  45.90  1,246,692.69 
5023+260.00  2.30  4.59  10.00  45.90  1,246,646.79 
5023+280.00  2.30  4.59  10.00  45.90  1,246,600.89 
5023+300.00  2.30  4.59  10.00  45.90  1,246,554.99 
5023+320.00  2.29  4.59  10.00  45.89  1,246,509.10 
5023+340.00  2.30  4.59  10.00  45.89  1,246,463.21 
5023+360.00  2.30  4.59  10.00  45.90  1,246,417.31 
5023+380.00  2.29  4.59  10.00  45.89  1,246,371.42 
5023+400.00  2.30  4.59  10.00  45.89  1,246,325.53 
5023+420.00  2.30  4.59  10.00  45.90  1,246,279.63 
5023+440.00  2.30  4.59  10.00  45.90  1,246,233.73 
5023+460.00  2.30  4.59  10.00  45.90  1,246,187.83 
5023+480.00  2.29  4.59  10.00  45.89  1,246,141.94 
5023+500.00  2.30  4.59  10.00  45.89  1,246,096.05 
5023+520.00  2.30  4.59  10.00  45.90  1,246,050.15 
5023+540.00  2.30  4.59  10.00  45.90  1,246,004.25 
5023+560.00  2.30  4.59  10.00  45.90  1,245,958.35 
5023+580.00  2.29  4.59  10.00  45.89  1,245,912.46 
5023+600.00  2.29  4.59  10.00  45.88  1,245,866.58 
5023+620.00  2.29  4.59  10.00  45.88  1,245,820.70 
5023+640.00  2.29  4.59  10.00  45.88  1,245,774.82 
5023+660.00  2.29  4.59  10.00  45.88  1,245,728.94 
5023+680.00  2.29  4.59  10.00  45.88  1,245,683.06 
5023+700.00  2.29  4.59  10.00  45.88  1,245,637.18 
5023+720.00  2.29  4.59  10.00  45.88  1,245,591.30 
5023+740.00  2.29  4.59  10.00  45.88  1,245,545.42 
5023+760.00  2.29  4.59  10.00  45.88  1,245,499.54 
5023+770.00  2.29  4.59  5.00  22.94  1,245,476.60 
5023+770.00  2.29  4.59  0.00  0.00  1,245,476.60 
5023+780.00  2.29  4.59  5.00  22.94  1,245,453.66 
5023+800.00  2.29  4.59  10.00  45.88  1,245,407.78 
5023+820.00  2.29  4.59  10.00  45.88  1,245,361.90 
5023+840.00  2.29  4.59  10.00  45.88  1,245,316.02 
5023+860.00  2.29  4.59  10.00  45.88  1,245,270.14 
5023+880.00  2.29  4.59  10.00  45.88  1,245,224.26 
5023+900.00  2.29  4.59  10.00  45.88  1,245,178.38 
5023+900.00  2.29  4.59  0.00  0.00  1,245,178.38 
5023+920.00  2.29  4.59  10.00  45.88  1,245,132.50 
5023+940.00  2.29  4.59  10.00  45.88  1,245,086.62 
5023+960.00  2.29  4.59  10.00  45.88  1,245,040.74 
5023+980.00  2.29  4.59  10.00  45.88  1,244,994.86 
5024+000.00  2.29  4.59  10.00  45.88  1,244,948.98 
5024+007.22  2.29  4.59  3.61  16.57  1,244,932.41 
5024+020.00  2.27  4.56  6.39  29.16  1,244,903.25 

593 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5024+040.00  2.23  4.50  10.00  45.02  1,244,858.23 


5024+060.00  2.20  4.43  10.00  44.28  1,244,813.95 
5024+080.00  2.20  4.39  10.00  43.93  1,244,770.02 
5024+100.00  2.23  4.43  10.00  44.28  1,244,725.74 
5024+120.00  2.27  4.50  10.00  44.97  1,244,680.77 
5024+137.22  2.30  4.56  8.61  39.29  1,244,641.49 
5024+140.00  2.30  4.59  1.39  6.38  1,244,635.11 
5024+160.00  2.30  4.59  10.00  45.92  1,244,589.19 
5024+180.00  2.30  4.59  10.00  45.92  1,244,543.27 
5024+200.00  2.30  4.59  10.00  45.92  1,244,497.35 
5024+220.00  2.30  4.59  10.00  45.92  1,244,451.43 
5024+240.00  2.30  4.59  10.00  45.92  1,244,405.51 
5024+250.00  2.30  4.59  5.00  22.96  1,244,382.55 
5024+260.00  2.30  4.59  5.00  22.96  1,244,359.59 
5024+280.00  2.30  4.59  10.00  45.92  1,244,313.67 
5024+300.00  2.30  4.59  10.00  45.92  1,244,267.75 
5024+320.00  2.30  4.59  10.00  45.92  1,244,221.83 
5024+340.00  2.30  4.59  10.00  45.92  1,244,175.91 
5024+360.00  2.30  4.59  10.00  45.92  1,244,129.99 
5024+380.00  2.30  4.59  10.00  45.92  1,244,084.07 
5024+400.00  2.30  4.59  10.00  45.92  1,244,038.15 
5024+420.00  2.30  4.59  10.00  45.92  1,243,992.23 
5024+440.00  2.30  4.59  10.00  45.92  1,243,946.31 
5024+460.00  2.30  4.59  10.00  45.92  1,243,900.39 
5024+480.00  2.30  4.59  10.00  45.92  1,243,854.47 
5024+500.00  2.30  4.59  10.00  45.92  1,243,808.55 
5024+515.53  2.30  4.59  7.76  35.65  1,243,772.90 
5024+520.00  2.34  4.63  2.24  10.36  1,243,762.54 
5024+535.53  2.48  4.82  7.76  37.38  1,243,725.16 
5024+540.00  2.48  4.96  2.24  11.10  1,243,714.06 
5024+560.00  2.48  4.96  10.00  49.62  1,243,664.44 
5024+580.00  2.48  4.96  10.00  49.62  1,243,614.82 
5024+588.65  2.48  4.96  4.32  21.46  1,243,593.36 
5024+600.00  2.46  4.94  5.68  28.03  1,243,565.33 
5024+620.00  2.42  4.88  10.00  48.76  1,243,516.57 
5024+640.00  2.38  4.80  10.00  47.96  1,243,468.61 
5024+640.00  2.38  4.76  0.00  0.00  1,243,468.61 
5024+660.00  2.34  4.72  10.00  47.18  1,243,421.43 
5024+680.00  2.30  4.64  10.00  46.42  1,243,375.01 
5024+700.00  2.27  4.57  10.00  45.68  1,243,329.33 
5024+718.65  2.23  4.50  9.32  41.95  1,243,287.38 
5024+720.00  2.23  4.47  0.68  3.02  1,243,284.36 
5024+740.00  2.23  4.47  10.00  44.66  1,243,239.70 
5024+760.00  2.23  4.47  10.00  44.66  1,243,195.04 
5024+780.00  2.23  4.47  10.00  44.66  1,243,150.38 

594 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5024+800.00  2.23  4.47  10.00  44.66  1,243,105.72 


5024+815.00  2.23  4.47  7.50  33.50  1,243,072.22 
5024+820.00  2.23  4.47  2.50  11.17  1,243,061.06 
5024+825.00  2.23  4.47  2.50  11.17  1,243,049.89 
5024+835.00  2.23  4.47  5.00  22.33  1,243,027.56 
5024+840.00  2.23  4.47  2.50  11.17  1,243,016.40 
5024+845.00  2.23  4.47  2.50  11.17  1,243,005.23 
5024+855.00  2.23  4.47  5.00  22.33  1,242,982.90 
5024+860.00  2.23  4.47  2.50  11.17  1,242,971.74 
5024+865.00  2.23  4.47  2.50  11.17  1,242,960.57 
5024+875.00  2.23  4.47  5.00  22.33  1,242,938.24 
5024+880.00  2.23  4.47  2.50  11.17  1,242,927.08 
5024+885.00  2.23  4.47  2.50  11.17  1,242,915.91 
5024+895.00  2.23  4.47  5.00  22.33  1,242,893.58 
5024+900.00  2.23  4.47  2.50  11.17  1,242,882.42 
5024+905.00  2.23  4.47  2.50  11.17  1,242,871.25 
5024+915.00  2.23  4.47  5.00  22.33  1,242,848.92 
5024+920.00  2.23  4.47  2.50  11.17  1,242,837.76 
5024+925.00  2.23  4.47  2.50  11.17  1,242,826.59 
5024+935.00  2.23  4.47  5.00  22.33  1,242,804.26 
5024+940.00  2.23  4.47  2.50  11.17  1,242,793.10 
5024+945.00  2.23  4.47  2.50  11.17  1,242,781.93 
5024+955.00  2.23  4.47  5.00  22.34  1,242,759.59 
5024+960.00  2.23  4.47  2.50  11.17  1,242,748.42 
5024+980.00  2.23  4.47  10.00  44.68  1,242,703.74 
5025+000.00  2.23  4.47  10.00  44.68  1,242,659.06 
5025+000.00  2.23  4.47  0.00  0.00  1,242,659.06 
5025+020.00  2.23  4.47  10.00  44.68  1,242,614.38 
5025+040.00  2.23  4.47  10.00  44.68  1,242,569.70 
5025+060.00  2.23  4.47  10.00  44.68  1,242,525.02 
5025+080.00  2.23  4.47  10.00  44.68  1,242,480.34 
5025+100.00  2.23  4.47  10.00  44.68  1,242,435.66 
5025+120.00  2.23  4.47  10.00  44.68  1,242,390.98 
5025+140.00  2.23  4.47  10.00  44.68  1,242,346.30 
5025+160.00  2.23  4.47  10.00  44.68  1,242,301.62 
5025+180.00  2.23  4.47  10.00  44.68  1,242,256.94 
5025+200.00  2.23  4.47  10.00  44.68  1,242,212.26 
5025+220.00  2.23  4.47  10.00  44.68  1,242,167.58 
5025+240.00  2.23  4.47  10.00  44.68  1,242,122.90 
5025+260.00  2.23  4.47  10.00  44.68  1,242,078.22 
5025+270.00  2.23  4.47  5.00  22.34  1,242,055.88 
5025+280.00  2.23  4.47  5.00  22.34  1,242,033.55 
5025+290.00  2.23  4.47  5.00  22.33  1,242,011.22 
5025+300.00  2.23  4.47  5.00  22.33  1,241,988.89 
5025+310.00  2.23  4.47  5.00  22.33  1,241,966.56 

595 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5025+320.00  2.23  4.47  5.00  22.33  1,241,944.23 


5025+330.00  2.23  4.47  5.00  22.33  1,241,921.90 
5025+340.00  2.23  4.47  5.00  22.33  1,241,899.57 
5025+350.00  2.23  4.47  5.00  22.33  1,241,877.24 
5025+360.00  2.23  4.47  5.00  22.33  1,241,854.91 
5025+370.00  2.23  4.47  5.00  22.33  1,241,832.58 
5025+380.00  2.23  4.47  5.00  22.33  1,241,810.25 
5025+390.00  2.23  4.47  5.00  22.33  1,241,787.92 
5025+400.00  2.23  4.47  5.00  22.33  1,241,765.59 
5025+420.00  2.23  4.47  10.00  44.66  1,241,720.93 
5025+440.00  2.23  4.47  10.00  44.66  1,241,676.27 
5025+460.00  2.23  4.47  10.00  44.66  1,241,631.61 
5025+480.00  2.23  4.47  10.00  44.66  1,241,586.95 
5025+500.00  2.23  4.47  10.00  44.66  1,241,542.29 
5025+520.00  2.23  4.47  10.00  44.66  1,241,497.63 
5025+521.36  2.23  4.47  0.68  3.03  1,241,494.59 
5025+540.00  2.29  4.52  9.32  42.16  1,241,452.43 
5025+541.36  2.29  4.58  0.68  3.11  1,241,449.32 
5025+550.36  2.29  4.59  4.50  20.65  1,241,428.67 
5025+560.00  2.28  4.57  4.82  22.04  1,241,406.63 
5025+580.00  2.25  4.52  10.00  45.24  1,241,361.39 
5025+600.00  2.21  4.46  10.00  44.57  1,241,316.82 
5025+620.00  2.18  4.39  10.00  43.92  1,241,272.90 
5025+640.00  2.21  4.39  10.00  43.87  1,241,229.03 
5025+640.36  2.21  4.42  0.18  0.79  1,241,228.24 
5025+660.00  2.21  4.42  9.82  43.37  1,241,184.87 
5025+680.00  2.21  4.42  10.00  44.16  1,241,140.71 
5025+700.00  2.21  4.42  10.00  44.16  1,241,096.55 
5025+720.00  2.21  4.42  10.00  44.16  1,241,052.39 
5025+733.68  2.21  4.42  6.84  30.20  1,241,022.19 
5025+740.00  2.20  4.41  3.16  13.93  1,241,008.26 
5025+760.00  2.19  4.39  10.00  43.89  1,240,964.37 
5025+780.00  2.22  4.41  10.00  44.12  1,240,920.25 
5025+800.00  2.26  4.48  10.00  44.77  1,240,875.48 
5025+820.00  2.29  4.54  10.00  45.44  1,240,830.04 
5025+823.68  2.30  4.58  1.84  8.43  1,240,821.61 
5025+840.00  2.30  4.59  8.16  37.46  1,240,784.15 
5025+860.00  2.30  4.59  10.00  45.90  1,240,738.25 
5025+880.00  2.29  4.59  10.00  45.89  1,240,692.36 
5025+882.88  2.29  4.59  1.44  6.61  1,240,685.75 
5025+900.00  2.30  4.59  8.56  39.27  1,240,646.47 
5025+920.00  2.30  4.59  10.00  45.90  1,240,600.57 
5025+940.00  2.29  4.59  10.00  45.89  1,240,554.68 
5025+960.00  2.30  4.59  10.00  45.89  1,240,508.79 
5025+980.00  2.30  4.59  10.00  45.90  1,240,462.89 

596 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5026+000.00  2.29  4.59  10.00  45.89  1,240,417.00 


5026+020.00  2.30  4.59  10.00  45.89  1,240,371.11 
5026+040.00  2.30  4.59  10.00  45.90  1,240,325.21 
5026+060.00  2.29  4.59  10.00  45.89  1,240,279.32 
5026+080.00  2.30  4.59  10.00  45.89  1,240,233.43 
5026+100.00  2.30  4.59  10.00  45.90  1,240,187.53 
5026+100.00  2.30  4.59  0.00  0.00  1,240,187.53 
5026+120.00  2.29  4.59  10.00  45.89  1,240,141.64 
5026+140.00  2.29  4.59  10.00  45.88  1,240,095.76 
5026+160.00  2.29  4.59  10.00  45.88  1,240,049.88 
5026+180.00  2.30  4.59  10.00  45.89  1,240,003.99 
5026+200.00  2.30  4.59  10.00  45.90  1,239,958.09 
5026+220.00  2.30  4.59  10.00  45.90  1,239,912.19 
5026+240.00  2.29  4.59  10.00  45.89  1,239,866.30 
5026+260.00  2.29  4.59  10.00  45.88  1,239,820.42 
5026+280.00  2.29  4.59  10.00  45.88  1,239,774.54 
5026+300.00  2.29  4.59  10.00  45.88  1,239,728.66 
5026+320.00  2.29  4.59  10.00  45.88  1,239,682.78 
5026+340.00  2.29  4.59  10.00  45.88  1,239,636.90 
5026+360.00  2.29  4.59  10.00  45.88  1,239,591.02 
5026+380.00  2.29  4.59  10.00  45.88  1,239,545.14 
5026+400.00  2.29  4.59  10.00  45.88  1,239,499.26 
5026+420.00  2.29  4.59  10.00  45.88  1,239,453.38 
5026+440.00  2.29  4.59  10.00  45.88  1,239,407.50 
5026+460.00  2.29  4.59  10.00  45.88  1,239,361.62 
5026+480.00  2.29  4.59  10.00  45.88  1,239,315.74 
5026+500.00  2.29  4.59  10.00  45.88  1,239,269.86 
5026+520.00  2.29  4.59  10.00  45.88  1,239,223.98 
5026+540.00  2.29  4.59  10.00  45.88  1,239,178.10 
5026+560.00  2.29  4.59  10.00  45.88  1,239,132.22 
5026+580.00  2.29  4.59  10.00  45.88  1,239,086.34 
5026+600.00  2.29  4.59  10.00  45.88  1,239,040.46 
5026+620.00  2.29  4.59  10.00  45.88  1,238,994.58 
5026+623.09  2.29  4.59  1.54  7.08  1,238,987.50 
5026+640.00  2.31  4.61  8.46  38.97  1,238,948.53 
5026+660.00  2.34  4.65  10.00  46.52  1,238,902.01 
5026+680.00  2.36  4.70  10.00  47.00  1,238,855.01 
5026+683.09  2.37  4.73  1.54  7.30  1,238,847.72 
5026+700.00  2.37  4.73  8.46  40.02  1,238,807.70 
5026+720.00  2.37  4.73  10.00  47.32  1,238,760.38 
5026+740.00  2.37  4.73  10.00  47.32  1,238,713.06 
5026+760.00  2.37  4.73  10.00  47.32  1,238,665.74 
5026+771.35  2.37  4.73  5.68  26.86  1,238,638.88 
5026+780.00  2.36  4.72  4.32  20.42  1,238,618.47 
5026+800.00  2.33  4.69  10.00  46.87  1,238,571.60 

597 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5026+820.00  2.31  4.64  10.00  46.40  1,238,525.20 


5026+831.35  2.29  4.60  5.68  26.12  1,238,499.08 
5026+840.00  2.29  4.59  4.32  19.84  1,238,479.24 
5026+860.00  2.29  4.59  10.00  45.88  1,238,433.36 
5026+880.00  2.29  4.59  10.00  45.88  1,238,387.48 
5026+900.00  2.29  4.59  10.00  45.88  1,238,341.60 
5026+920.00  2.29  4.59  10.00  45.88  1,238,295.72 
5026+940.00  2.29  4.59  10.00  45.88  1,238,249.84 
5026+960.00  2.29  4.59  10.00  45.88  1,238,203.96 
5026+980.00  2.29  4.59  10.00  45.88  1,238,158.08 
5027+000.00  2.30  4.59  10.00  45.89  1,238,112.19 
5027+020.00  2.30  4.59  10.00  45.90  1,238,066.29 
5027+020.00  2.30  4.59  0.00  0.00  1,238,066.29 
5027+040.00  2.30  4.59  10.00  45.90  1,238,020.39 
5027+060.00  2.30  4.59  10.00  45.90  1,237,974.49 
5027+080.00  2.30  4.59  10.00  45.90  1,237,928.59 
5027+100.00  2.30  4.59  10.00  45.90  1,237,882.69 
5027+120.00  2.30  4.59  10.00  45.90  1,237,836.79 
5027+140.00  2.29  4.59  10.00  45.89  1,237,790.90 
5027+160.00  2.30  4.59  10.00  45.89  1,237,745.01 
5027+180.00  2.30  4.59  10.00  45.90  1,237,699.11 
5027+200.00  2.29  4.59  10.00  45.89  1,237,653.22 
5027+220.00  2.30  4.59  10.00  45.89  1,237,607.33 
5027+240.00  2.30  4.59  10.00  45.90  1,237,561.43 
5027+260.00  2.30  4.59  10.00  45.90  1,237,515.53 
5027+280.00  2.30  4.59  10.00  45.90  1,237,469.63 
5027+300.00  2.30  4.59  10.00  45.90  1,237,423.73 
5027+320.00  2.30  4.59  10.00  45.90  1,237,377.83 
5027+340.00  2.29  4.59  10.00  45.89  1,237,331.94 
5027+360.00  2.29  4.59  10.00  45.88  1,237,286.06 
5027+380.00  2.30  4.59  10.00  45.89  1,237,240.17 
5027+400.00  2.30  4.59  10.00  45.90  1,237,194.27 
5027+420.00  2.30  4.59  10.00  45.90  1,237,148.37 
5027+440.00  2.29  4.59  10.00  45.89  1,237,102.48 
5027+460.00  2.30  4.59  10.00  45.89  1,237,056.59 
5027+480.00  2.30  4.59  10.00  45.90  1,237,010.69 
5027+500.00  2.29  4.59  10.00  45.89  1,236,964.80 
5027+520.00  2.30  4.59  10.00  45.89  1,236,918.91 
5027+540.00  2.30  4.59  10.00  45.90  1,236,873.01 
5027+560.00  2.29  4.59  10.00  45.89  1,236,827.12 
5027+580.00  2.30  4.59  10.00  45.89  1,236,781.23 
5027+600.00  2.30  4.59  10.00  45.90  1,236,735.33 
5027+620.00  2.29  4.59  10.00  45.89  1,236,689.44 
5027+640.00  2.30  4.59  10.00  45.89  1,236,643.55 
5027+660.00  2.30  4.59  10.00  45.90  1,236,597.65 

598 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5027+680.00  2.29  4.59  10.00  45.89  1,236,551.76 


5027+700.00  2.30  4.59  10.00  45.89  1,236,505.87 
5027+720.00  2.30  4.59  10.00  45.90  1,236,459.97 
5027+740.00  2.29  4.59  10.00  45.89  1,236,414.08 
5027+750.00  2.30  4.59  5.00  22.95  1,236,391.13 
5027+750.00  2.30  4.59  0.00  0.00  1,236,391.13 
5027+760.00  2.30  4.59  5.00  22.95  1,236,368.18 
5027+780.00  2.30  4.59  10.00  45.90  1,236,322.28 
5027+800.00  2.29  4.59  10.00  45.89  1,236,276.39 
5027+820.00  2.30  4.59  10.00  45.89  1,236,230.50 
5027+840.00  2.30  4.59  10.00  45.90  1,236,184.60 
5027+860.00  2.29  4.59  10.00  45.89  1,236,138.71 
5027+880.00  2.30  4.59  10.00  45.89  1,236,092.82 
5027+900.00  2.30  4.59  10.00  45.90  1,236,046.92 
5027+920.00  2.29  4.59  10.00  45.89  1,236,001.03 
5027+940.00  2.30  4.59  10.00  45.89  1,235,955.14 
5027+960.00  2.30  4.59  10.00  45.90  1,235,909.24 
5027+980.00  2.29  4.59  10.00  45.89  1,235,863.35 
5028+000.00  2.30  4.59  10.00  45.89  1,235,817.46 
5028+020.00  2.30  4.59  10.00  45.90  1,235,771.56 
5028+040.00  2.29  4.59  10.00  45.89  1,235,725.67 
5028+060.00  2.30  4.59  10.00  45.89  1,235,679.78 
5028+080.00  2.30  4.59  10.00  45.90  1,235,633.88 
5028+100.00  2.29  4.59  10.00  45.89  1,235,587.99 
5028+120.00  2.30  4.59  10.00  45.89  1,235,542.10 
5028+140.00  2.30  4.59  10.00  45.90  1,235,496.20 
5028+160.00  2.29  4.59  10.00  45.89  1,235,450.31 
5028+180.00  2.30  4.59  10.00  45.89  1,235,404.42 
5028+200.00  2.30  4.59  10.00  45.90  1,235,358.52 
5028+220.00  2.29  4.59  10.00  45.89  1,235,312.63 
5028+240.00  2.30  4.59  10.00  45.89  1,235,266.74 
5028+260.00  2.30  4.59  10.00  45.90  1,235,220.84 
5028+280.00  2.29  4.59  10.00  45.89  1,235,174.95 
5028+300.00  2.30  4.59  10.00  45.89  1,235,129.06 
5028+320.00  2.30  4.59  10.00  45.90  1,235,083.16 
5028+340.00  2.29  4.59  10.00  45.89  1,235,037.27 
5028+360.00  2.30  4.59  10.00  45.89  1,234,991.38 
5028+380.00  2.30  4.59  10.00  45.90  1,234,945.48 
5028+400.00  2.29  4.59  10.00  45.89  1,234,899.59 
5028+420.00  2.30  4.59  10.00  45.89  1,234,853.70 
5028+440.00  2.30  4.59  10.00  45.90  1,234,807.80 
5028+460.00  2.29  4.59  10.00  45.89  1,234,761.91 
5028+480.00  2.30  4.59  10.00  45.89  1,234,716.02 
5028+490.00  2.29  4.59  5.00  22.95  1,234,693.08 
5028+490.00  2.29  4.59  0.00  0.00  1,234,693.08 

599 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5028+500.00  2.30  4.59  5.00  22.95  1,234,670.13 


5028+520.00  2.29  4.59  10.00  45.89  1,234,624.24 
5028+540.00  2.30  4.59  10.00  45.89  1,234,578.35 
5028+560.00  2.30  4.59  10.00  45.90  1,234,532.45 
5028+580.00  2.29  4.59  10.00  45.89  1,234,486.56 
5028+600.00  2.30  4.59  10.00  45.89  1,234,440.67 
5028+620.00  2.30  4.59  10.00  45.90  1,234,394.77 
5028+640.00  2.30  4.59  10.00  45.90  1,234,348.87 
5028+660.00  2.29  4.59  10.00  45.89  1,234,302.98 
5028+680.00  2.30  4.59  10.00  45.89  1,234,257.09 
5028+700.00  2.30  4.59  10.00  45.90  1,234,211.19 
5028+720.00  2.30  4.59  10.00  45.90  1,234,165.29 
5028+740.00  2.30  4.59  10.00  45.90  1,234,119.39 
5028+760.00  2.29  4.59  10.00  45.89  1,234,073.50 
5028+780.00  2.30  4.59  10.00  45.89  1,234,027.61 
5028+800.00  2.30  4.59  10.00  45.90  1,233,981.71 
5028+820.00  2.29  4.59  10.00  45.89  1,233,935.82 
5028+840.00  2.30  4.59  10.00  45.89  1,233,889.93 
5028+860.00  2.29  4.59  10.00  45.89  1,233,844.04 
5028+880.00  2.30  4.59  10.00  45.89  1,233,798.15 
5028+900.00  2.30  4.59  10.00  45.90  1,233,752.25 
5028+920.00  2.30  4.59  10.00  45.90  1,233,706.35 
5028+920.00  2.30  4.59  0.00  0.00  1,233,706.35 
5028+940.00  2.29  4.59  10.00  45.89  1,233,660.46 
5028+960.00  2.29  4.59  10.00  45.88  1,233,614.58 
5028+980.00  2.30  4.59  10.00  45.89  1,233,568.69 
5029+000.00  2.30  4.59  10.00  45.90  1,233,522.79 
5029+020.00  2.30  4.59  10.00  45.90  1,233,476.89 
5029+040.00  2.30  4.59  10.00  45.90  1,233,430.99 
5029+060.00  2.29  4.59  10.00  45.89  1,233,385.10 
5029+080.00  2.30  4.59  10.00  45.89  1,233,339.21 
5029+100.00  2.30  4.59  10.00  45.90  1,233,293.31 
5029+120.00  2.30  4.59  10.00  45.90  1,233,247.41 
5029+140.00  2.30  4.59  10.00  45.90  1,233,201.51 
5029+160.00  2.29  4.59  10.00  45.89  1,233,155.62 
5029+180.00  2.30  4.59  10.00  45.89  1,233,109.73 
5029+200.00  2.30  4.59  10.00  45.90  1,233,063.83 
5029+220.00  2.30  4.59  10.00  45.90  1,233,017.93 
5029+240.00  2.30  4.59  10.00  45.90  1,232,972.03 
5029+260.00  2.29  4.59  10.00  45.89  1,232,926.14 
5029+280.00  2.30  4.59  10.00  45.89  1,232,880.25 
5029+285.11  2.30  4.59  2.56  11.73  1,232,868.52 
5029+300.00  2.32  4.62  7.44  34.38  1,232,834.14 
5029+320.00  2.36  4.68  10.00  46.84  1,232,787.30 
5029+340.00  2.40  4.76  10.00  47.61  1,232,739.69 

600 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5029+360.00  2.44  4.84  10.00  48.39  1,232,691.30 


5029+380.00  2.48  4.92  10.00  49.20  1,232,642.10 
5029+400.00  2.52  5.00  10.00  50.03  1,232,592.07 
5029+420.00  2.56  5.09  10.00  50.86  1,232,541.21 
5029+435.11  2.60  5.16  7.56  38.99  1,232,502.22 
5029+440.00  2.60  5.19  2.44  12.70  1,232,489.52 
5029+440.00  2.60  5.19  0.00  0.00  1,232,489.52 
5029+460.00  2.60  5.19  10.00  51.94  1,232,437.58 
5029+480.00  2.60  5.19  10.00  51.94  1,232,385.64 
5029+500.00  2.60  5.19  10.00  51.94  1,232,333.70 
5029+520.00  2.60  5.19  10.00  51.94  1,232,281.76 
5029+540.00  2.60  5.19  10.00  51.94  1,232,229.82 
5029+560.00  2.60  5.19  10.00  51.94  1,232,177.88 
5029+580.00  2.60  5.19  10.00  51.94  1,232,125.94 
5029+600.00  2.60  5.19  10.00  51.94  1,232,074.00 
5029+620.00  2.60  5.19  10.00  51.94  1,232,022.06 
5029+640.00  2.60  5.19  10.00  51.94  1,231,970.12 
5029+660.00  2.60  5.19  10.00  51.94  1,231,918.18 
5029+680.00  2.60  5.19  10.00  51.94  1,231,866.24 
5029+700.00  2.60  5.19  10.00  51.94  1,231,814.30 
5029+720.00  2.60  5.19  10.00  51.94  1,231,762.36 
5029+740.00  2.60  5.19  10.00  51.94  1,231,710.42 
5029+740.00  2.60  5.19  0.00  0.00  1,231,710.42 
5029+740.36  2.60  5.19  0.18  0.94  1,231,709.48 
5029+760.00  2.56  5.15  9.82  50.59  1,231,658.89 
5029+780.00  2.51  5.07  10.00  50.67  1,231,608.22 
5029+800.00  2.47  4.98  10.00  49.83  1,231,558.39 
5029+820.00  2.43  4.90  10.00  49.02  1,231,509.37 
5029+840.00  2.39  4.82  10.00  48.22  1,231,461.15 
5029+860.00  2.35  4.74  10.00  47.43  1,231,413.72 
5029+880.00  2.31  4.67  10.00  46.66  1,231,367.06 
5029+890.36  2.30  4.61  5.18  23.88  1,231,343.18 
5029+900.00  2.30  4.59  4.82  22.12  1,231,321.07 
5029+920.00  2.30  4.59  10.00  45.90  1,231,275.17 
5029+940.00  2.30  4.59  10.00  45.90  1,231,229.27 
5029+960.00  2.29  4.59  10.00  45.89  1,231,183.38 
5029+980.00  2.29  4.59  10.00  45.88  1,231,137.50 
5030+000.00  2.30  4.59  10.00  45.89  1,231,091.61 
5030+020.00  2.30  4.59  10.00  45.90  1,231,045.71 
5030+040.00  2.30  4.59  10.00  45.90  1,230,999.81 
5030+060.00  2.29  4.59  10.00  45.89  1,230,953.92 
5030+065.00  2.29  4.59  2.50  11.47  1,230,942.45 
5030+065.00  2.29  4.59  0.00  0.00  1,230,942.45 
5030+080.00  2.29  4.59  7.50  34.41  1,230,908.04 
5030+100.00  2.30  4.59  10.00  45.89  1,230,862.15 

601 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5030+120.00  2.30  4.59  10.00  45.90  1,230,816.25 


5030+140.00  2.30  4.59  10.00  45.90  1,230,770.35 
5030+160.00  2.29  4.59  10.00  45.89  1,230,724.46 
5030+180.00  2.29  4.59  10.00  45.88  1,230,678.58 
5030+200.00  2.30  4.59  10.00  45.89  1,230,632.69 
5030+220.00  2.30  4.59  10.00  45.90  1,230,586.79 
5030+240.00  2.30  4.59  10.00  45.90  1,230,540.89 
5030+260.00  2.29  4.59  10.00  45.89  1,230,495.00 
5030+280.00  2.29  4.59  10.00  45.88  1,230,449.12 
5030+300.00  2.30  4.59  10.00  45.89  1,230,403.23 
5030+320.00  2.30  4.59  10.00  45.90  1,230,357.33 
5030+340.00  2.30  4.59  10.00  45.90  1,230,311.43 
5030+360.00  2.29  4.59  10.00  45.89  1,230,265.54 
5030+380.00  2.29  4.59  10.00  45.88  1,230,219.66 
5030+400.00  2.30  4.59  10.00  45.89  1,230,173.77 
5030+420.00  2.30  4.59  10.00  45.90  1,230,127.87 
5030+440.00  2.30  4.59  10.00  45.90  1,230,081.97 
5030+460.00  2.29  4.59  10.00  45.89  1,230,036.08 
5030+480.00  2.29  4.59  10.00  45.88  1,229,990.20 
5030+500.00  2.30  4.59  10.00  45.89  1,229,944.31 
5030+520.00  2.30  4.59  10.00  45.90  1,229,898.41 
5030+540.00  2.30  4.59  10.00  45.90  1,229,852.51 
5030+560.00  2.30  4.59  10.00  45.90  1,229,806.61 
5030+580.00  2.29  4.59  10.00  45.89  1,229,760.72 
5030+600.00  2.30  4.59  10.00  45.89  1,229,714.83 
5030+620.00  2.30  4.59  10.00  45.90  1,229,668.93 
5030+640.00  2.30  4.59  10.00  45.90  1,229,623.03 
5030+660.00  2.30  4.59  10.00  45.90  1,229,577.13 
5030+680.00  2.29  4.59  10.00  45.89  1,229,531.24 
5030+700.00  2.30  4.59  10.00  45.89  1,229,485.35 
5030+713.58  2.30  4.59  6.79  31.17  1,229,454.18 
5030+720.00  2.30  4.59  3.21  14.73  1,229,439.45 
5030+740.00  2.30  4.59  10.00  45.90  1,229,393.55 
5030+743.58  2.30  4.59  1.79  8.22  1,229,385.33 
5030+760.00  2.30  4.59  8.21  37.68  1,229,347.65 
5030+780.00  2.29  4.59  10.00  45.89  1,229,301.76 
5030+800.00  2.30  4.59  10.00  45.89  1,229,255.87 
5030+820.00  2.30  4.59  10.00  45.90  1,229,209.97 
5030+831.05  2.30  4.59  5.52  25.36  1,229,184.61 
5030+840.00  2.30  4.59  4.48  20.54  1,229,164.07 
5030+860.00  2.30  4.59  10.00  45.90  1,229,118.17 
5030+861.05  2.30  4.59  0.52  2.41  1,229,115.76 
5030+880.00  2.29  4.59  9.48  43.48  1,229,072.28 
5030+900.00  2.30  4.59  10.00  45.89  1,229,026.39 
5030+920.00  2.30  4.59  10.00  45.90  1,228,980.49 

602 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5030+940.00  2.30  4.59  10.00  45.90  1,228,934.59 


5030+940.00  2.30  4.59  0.00  0.00  1,228,934.59 
5030+960.00  2.30  4.59  10.00  45.90  1,228,888.69 
5030+980.00  2.29  4.59  10.00  45.89  1,228,842.80 
5031+000.00  2.30  4.59  10.00  45.89  1,228,796.91 
5031+020.00  2.30  4.59  10.00  45.90  1,228,751.01 
5031+040.00  2.30  4.59  10.00  45.90  1,228,705.11 
5031+060.00  2.30  4.59  10.00  45.90  1,228,659.21 
5031+080.00  2.29  4.59  10.00  45.89  1,228,613.32 
5031+100.00  2.30  4.59  10.00  45.89  1,228,567.43 
5031+120.00  2.30  4.59  10.00  45.90  1,228,521.53 
5031+140.00  2.30  4.59  10.00  45.90  1,228,475.63 
5031+160.00  2.30  4.59  10.00  45.90  1,228,429.73 
5031+180.00  2.29  4.59  10.00  45.89  1,228,383.84 
5031+200.00  2.30  4.59  10.00  45.89  1,228,337.95 
5031+220.00  2.30  4.59  10.00  45.90  1,228,292.05 
5031+240.00  2.30  4.59  10.00  45.90  1,228,246.15 
5031+260.00  2.30  4.59  10.00  45.90  1,228,200.25 
5031+280.00  2.29  4.59  10.00  45.89  1,228,154.36 
5031+300.00  2.29  4.59  10.00  45.88  1,228,108.48 
5031+320.00  2.30  4.59  10.00  45.89  1,228,062.59 
5031+340.00  2.30  4.59  10.00  45.90  1,228,016.69 
5031+360.00  2.30  4.59  10.00  45.90  1,227,970.79 
5031+380.00  2.29  4.59  10.00  45.89  1,227,924.90 
5031+400.00  2.29  4.59  10.00  45.88  1,227,879.02 
5031+420.00  2.30  4.59  10.00  45.89  1,227,833.13 
5031+440.00  2.30  4.59  10.00  45.90  1,227,787.23 
5031+460.00  2.30  4.59  10.00  45.90  1,227,741.33 
5031+480.00  2.29  4.59  10.00  45.89  1,227,695.44 
5031+500.00  2.29  4.59  10.00  45.88  1,227,649.56 
5031+520.00  2.30  4.59  10.00  45.89  1,227,603.67 
5031+540.00  2.30  4.59  10.00  45.90  1,227,557.77 
5031+560.00  2.30  4.59  10.00  45.90  1,227,511.87 
5031+580.00  2.29  4.59  10.00  45.89  1,227,465.98 
5031+600.00  2.29  4.59  10.00  45.88  1,227,420.10 
5031+620.00  2.30  4.59  10.00  45.89  1,227,374.21 
5031+640.00  2.30  4.59  10.00  45.90  1,227,328.31 
5031+660.00  2.30  4.59  10.00  45.90  1,227,282.41 
5031+680.00  2.29  4.59  10.00  45.89  1,227,236.52 
5031+700.00  2.29  4.59  10.00  45.88  1,227,190.64 
5031+720.00  2.30  4.59  10.00  45.89  1,227,144.75 
5031+740.00  2.30  4.59  10.00  45.90  1,227,098.85 
5031+760.00  2.30  4.59  10.00  45.90  1,227,052.95 
5031+780.00  2.29  4.59  10.00  45.89  1,227,007.06 
5031+800.00  2.29  4.59  10.00  45.88  1,226,961.18 

603 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5031+820.00  2.30  4.59  10.00  45.89  1,226,915.29 


5031+840.00  2.30  4.59  10.00  45.90  1,226,869.39 
5031+860.00  2.30  4.59  10.00  45.90  1,226,823.49 
5031+880.00  2.30  4.59  10.00  45.90  1,226,777.59 
5031+900.00  2.30  4.59  10.00  45.90  1,226,731.69 
5031+920.00  2.29  4.59  10.00  45.89  1,226,685.80 
5031+940.00  2.29  4.59  10.00  45.88  1,226,639.92 
5031+960.00  2.29  4.59  10.00  45.88  1,226,594.04 
5031+980.00  2.30  4.59  10.00  45.89  1,226,548.15 
5032+000.00  2.30  4.59  10.00  45.90  1,226,502.25 
5032+020.00  2.30  4.59  10.00  45.90  1,226,456.35 
5032+040.00  2.30  4.59  10.00  45.90  1,226,410.45 
5032+060.00  2.29  4.59  10.00  45.89  1,226,364.56 
5032+080.00  2.30  4.59  10.00  45.89  1,226,318.67 
5032+100.00  2.30  4.59  10.00  45.90  1,226,272.77 
5032+120.00  2.29  4.59  10.00  45.89  1,226,226.88 
5032+140.00  2.30  4.59  10.00  45.89  1,226,180.99 
5032+160.00  2.29  4.59  10.00  45.89  1,226,135.10 
5032+180.00  2.29  4.59  10.00  45.88  1,226,089.22 
5032+200.00  2.29  4.59  10.00  45.88  1,226,043.34 
5032+220.00  2.30  4.59  10.00  45.89  1,225,997.45 
5032+240.00  2.30  4.59  10.00  45.90  1,225,951.55 
5032+260.00  2.30  4.59  10.00  45.90  1,225,905.65 
5032+280.00  2.29  4.59  10.00  45.89  1,225,859.76 
5032+300.00  2.29  4.59  10.00  45.88  1,225,813.88 
5032+320.00  2.29  4.59  10.00  45.88  1,225,768.00 
5032+340.00  2.29  4.59  10.00  45.88  1,225,722.12 
5032+360.00  2.29  4.59  10.00  45.88  1,225,676.24 
5032+380.00  2.29  4.59  10.00  45.88  1,225,630.36 
5032+400.00  2.29  4.59  10.00  45.88  1,225,584.48 
5032+420.00  2.29  4.59  10.00  45.88  1,225,538.60 
5032+440.00  2.29  4.59  10.00  45.88  1,225,492.72 
5032+460.00  2.29  4.59  10.00  45.88  1,225,446.84 
5032+480.00  2.29  4.59  10.00  45.88  1,225,400.96 
5032+500.00  2.29  4.59  10.00  45.88  1,225,355.08 
5032+520.00  2.29  4.59  10.00  45.88  1,225,309.20 
5032+540.00  2.29  4.59  10.00  45.88  1,225,263.32 
5032+560.00  2.29  4.59  10.00  45.88  1,225,217.44 
5032+580.00  2.29  4.59  10.00  45.88  1,225,171.56 
5032+600.00  2.29  4.59  10.00  45.88  1,225,125.68 
5032+620.00  2.29  4.59  10.00  45.88  1,225,079.80 
5032+640.00  2.29  4.59  10.00  45.88  1,225,033.92 
5032+660.00  2.29  4.59  10.00  45.88  1,224,988.04 
5032+680.00  2.29  4.59  10.00  45.88  1,224,942.16 
5032+700.00  2.29  4.59  10.00  45.88  1,224,896.28 

604 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5032+720.00  2.29  4.59  10.00  45.88  1,224,850.40 


5032+740.00  2.29  4.59  10.00  45.88  1,224,804.52 
5032+760.00  2.29  4.59  10.00  45.88  1,224,758.64 
5032+780.00  2.29  4.59  10.00  45.88  1,224,712.76 
5032+800.00  2.29  4.59  10.00  45.88  1,224,666.88 
5032+820.00  2.29  4.59  10.00  45.88  1,224,621.00 
5032+840.00  2.29  4.59  10.00  45.88  1,224,575.12 
5032+860.00  2.30  4.59  10.00  45.89  1,224,529.23 
5032+880.00  2.30  4.59  10.00  45.90  1,224,483.33 
5032+900.00  2.29  4.59  10.00  45.89  1,224,437.44 
5032+920.00  2.30  4.59  10.00  45.89  1,224,391.55 
5032+940.00  2.30  4.59  10.00  45.90  1,224,345.65 
5032+960.00  2.30  4.59  10.00  45.90  1,224,299.75 
5032+980.00  2.30  4.59  10.00  45.90  1,224,253.85 
5033+000.00  2.30  4.59  10.00  45.90  1,224,207.95 
5033+020.00  2.29  4.59  10.00  45.89  1,224,162.06 
5033+040.00  2.30  4.59  10.00  45.89  1,224,116.17 
5033+060.00  2.30  4.59  10.00  45.90  1,224,070.27 
5033+080.00  2.29  4.59  10.00  45.89  1,224,024.38 
5033+100.00  2.30  4.59  10.00  45.89  1,223,978.49 
5033+120.00  2.29  4.59  10.00  45.89  1,223,932.60 
5033+140.00  2.30  4.59  10.00  45.89  1,223,886.71 
5033+160.00  2.30  4.59  10.00  45.90  1,223,840.81 
5033+180.00  2.30  4.59  10.00  45.90  1,223,794.91 
5033+200.00  2.30  4.59  10.00  45.90  1,223,749.01 
5033+220.00  2.30  4.59  10.00  45.90  1,223,703.11 
5033+240.00  2.30  4.59  10.00  45.90  1,223,657.21 
5033+260.00  2.30  4.59  10.00  45.90  1,223,611.31 
5033+280.00  2.30  4.59  10.00  45.90  1,223,565.41 
5033+300.00  2.30  4.59  10.00  45.90  1,223,519.51 
5033+320.00  2.30  4.59  10.00  45.90  1,223,473.61 
5033+340.00  2.30  4.59  10.00  45.90  1,223,427.71 
5033+360.00  2.29  4.59  10.00  45.89  1,223,381.82 
5033+380.00  2.30  4.59  10.00  45.89  1,223,335.93 
5033+400.00  2.30  4.59  10.00  45.90  1,223,290.03 
5033+420.00  2.30  4.59  10.00  45.90  1,223,244.13 
5033+440.00  2.30  4.59  10.00  45.90  1,223,198.23 
5033+460.00  2.29  4.59  10.00  45.89  1,223,152.34 
5033+480.00  2.29  4.59  10.00  45.88  1,223,106.46 
5033+500.00  2.30  4.59  10.00  45.89  1,223,060.57 
5033+520.00  2.30  4.59  10.00  45.90  1,223,014.67 
5033+540.00  2.30  4.59  10.00  45.90  1,222,968.77 
5033+560.00  2.30  4.59  10.00  45.90  1,222,922.87 
5033+580.00  2.29  4.59  10.00  45.89  1,222,876.98 
5033+600.00  2.30  4.59  10.00  45.89  1,222,831.09 

605 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5033+620.00  2.30  4.59  10.00  45.90  1,222,785.19 


5033+640.00  2.29  4.59  10.00  45.89  1,222,739.30 
5033+660.00  2.29  4.59  10.00  45.88  1,222,693.42 
5033+680.00  2.29  4.59  10.00  45.88  1,222,647.54 
5033+700.00  2.29  4.59  10.00  45.88  1,222,601.66 
5033+720.00  2.29  4.59  10.00  45.88  1,222,555.78 
5033+740.00  2.29  4.59  10.00  45.88  1,222,509.90 
5033+750.00  2.29  4.59  5.00  22.94  1,222,486.96 
5033+760.00  2.29  4.59  5.00  22.94  1,222,464.02 
5033+763.47  2.29  4.59  1.74  7.97  1,222,456.05 
5033+780.00  2.29  4.59  8.26  37.91  1,222,418.14 
5033+793.47  2.29  4.59  6.74  30.91  1,222,387.23 
5033+800.00  2.29  4.59  3.26  14.97  1,222,372.26 
5033+820.00  2.29  4.59  10.00  45.88  1,222,326.38 
5033+840.00  2.29  4.59  10.00  45.88  1,222,280.50 
5033+860.00  2.29  4.59  10.00  45.88  1,222,234.62 
5033+877.83  2.29  4.59  8.92  40.90  1,222,193.71 
5033+880.00  2.29  4.59  1.08  4.98  1,222,188.74 
5033+900.00  2.29  4.59  10.00  45.88  1,222,142.86 
5033+907.83  2.29  4.59  3.92  17.96  1,222,124.89 
5033+920.00  2.29  4.59  6.08  27.92  1,222,096.98 
5033+940.00  2.29  4.59  10.00  45.88  1,222,051.10 
5033+960.00  2.29  4.59  10.00  45.88  1,222,005.22 
5033+980.00  2.29  4.59  10.00  45.88  1,221,959.34 
5034+000.00  2.29  4.59  10.00  45.88  1,221,913.46 
5034+020.00  2.29  4.59  10.00  45.88  1,221,867.58 
5034+040.00  2.30  4.59  10.00  45.89  1,221,821.69 
5034+060.00  2.30  4.59  10.00  45.90  1,221,775.79 
5034+080.00  2.30  4.59  10.00  45.90  1,221,729.89 
5034+100.00  2.30  4.59  10.00  45.90  1,221,683.99 
5034+120.00  2.30  4.59  10.00  45.90  1,221,638.09 
5034+140.00  2.30  4.59  10.00  45.90  1,221,592.19 
5034+160.00  2.29  4.59  10.00  45.89  1,221,546.30 
5034+180.00  2.29  4.59  10.00  45.88  1,221,500.42 
5034+200.00  2.30  4.59  10.00  45.89  1,221,454.53 
5034+200.00  2.30  4.59  0.00  0.00  1,221,454.53 
5034+220.00  2.29  4.59  10.00  45.89  1,221,408.64 
5034+240.00  2.30  4.59  10.00  45.89  1,221,362.75 
5034+260.00  2.29  4.59  10.00  45.89  1,221,316.86 
5034+280.00  2.30  4.59  10.00  45.89  1,221,270.97 
5034+290.00  2.30  4.59  5.00  22.95  1,221,248.02 
5034+290.00  2.30  4.59  0.00  0.00  1,221,248.02 
5034+300.00  2.29  4.59  5.00  22.95  1,221,225.07 
5034+320.00  2.30  4.59  10.00  45.89  1,221,179.18 
5034+340.00  2.29  4.59  10.00  45.89  1,221,133.29 

606 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5034+360.00  2.30  4.59  10.00  45.89  1,221,087.40 


5034+380.00  2.30  4.59  10.00  45.90  1,221,041.50 
5034+400.00  2.30  4.59  10.00  45.90  1,220,995.60 
5034+420.00  2.30  4.59  10.00  45.90  1,220,949.70 
5034+440.00  2.29  4.59  10.00  45.89  1,220,903.81 
5034+450.00  2.29  4.59  5.00  22.94  1,220,880.87 
5034+460.00  2.30  4.59  5.00  22.95  1,220,857.93 
5034+480.00  2.30  4.59  10.00  45.90  1,220,812.03 
5034+500.00  2.29  4.59  10.00  45.89  1,220,766.14 
5034+520.00  2.29  4.59  10.00  45.88  1,220,720.26 
5034+540.00  2.29  4.59  10.00  45.88  1,220,674.38 
5034+560.00  2.29  4.59  10.00  45.88  1,220,628.50 
5034+580.00  2.29  4.59  10.00  45.88  1,220,582.62 
5034+600.00  2.29  4.59  10.00  45.88  1,220,536.74 
5034+620.00  2.29  4.59  10.00  45.88  1,220,490.86 
5034+640.00  2.29  4.59  10.00  45.88  1,220,444.98 
5034+660.00  2.29  4.59  10.00  45.88  1,220,399.10 
5034+680.00  2.29  4.59  10.00  45.88  1,220,353.22 
5034+700.00  2.29  4.59  10.00  45.88  1,220,307.34 
5034+720.00  2.29  4.59  10.00  45.88  1,220,261.46 
5034+740.00  2.29  4.59  10.00  45.88  1,220,215.58 
5034+760.00  2.29  4.59  10.00  45.88  1,220,169.70 
5034+780.00  2.29  4.59  10.00  45.88  1,220,123.82 
5034+800.00  2.29  4.59  10.00  45.88  1,220,077.94 
5034+820.00  2.29  4.59  10.00  45.88  1,220,032.06 
5034+840.00  2.29  4.59  10.00  45.88  1,219,986.18 
5034+860.00  2.29  4.59  10.00  45.88  1,219,940.30 
5034+880.00  2.29  4.59  10.00  45.88  1,219,894.42 
5034+900.00  2.29  4.59  10.00  45.88  1,219,848.54 
5034+920.00  2.29  4.59  10.00  45.88  1,219,802.66 
5034+940.00  2.29  4.59  10.00  45.88  1,219,756.78 
5034+960.00  2.29  4.59  10.00  45.88  1,219,710.90 
5034+980.00  2.29  4.59  10.00  45.88  1,219,665.02 
5035+000.00  2.29  4.59  10.00  45.88  1,219,619.14 
5035+020.00  2.29  4.59  10.00  45.88  1,219,573.26 
5035+028.75  2.29  4.59  4.38  20.08  1,219,553.17 
5035+040.00  2.29  4.59  5.62  25.80  1,219,527.38 
5035+058.75  2.29  4.59  9.38  43.02  1,219,484.35 
5035+060.00  2.29  4.59  0.62  2.86  1,219,481.50 
5035+080.00  2.29  4.59  10.00  45.88  1,219,435.62 
5035+100.00  2.29  4.59  10.00  45.88  1,219,389.74 
5035+100.00  2.29  4.59  0.00  0.00  1,219,389.74 
5035+120.00  2.29  4.59  10.00  45.88  1,219,343.86 
5035+140.00  2.29  4.59  10.00  45.88  1,219,297.98 
5035+143.04  2.29  4.59  1.52  6.98  1,219,290.99 

607 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5035+160.00  2.29  4.59  8.48  38.90  1,219,252.10 


5035+173.04  2.29  4.59  6.52  29.92  1,219,222.17 
5035+180.00  2.29  4.59  3.48  15.96  1,219,206.22 
5035+200.00  2.29  4.59  10.00  45.88  1,219,160.34 
5035+220.00  2.29  4.59  10.00  45.88  1,219,114.46 
5035+240.00  2.29  4.59  10.00  45.88  1,219,068.58 
5035+260.00  2.29  4.59  10.00  45.88  1,219,022.70 
5035+280.00  2.29  4.59  10.00  45.88  1,218,976.82 
5035+300.00  2.29  4.59  10.00  45.88  1,218,930.94 
5035+320.00  2.29  4.59  10.00  45.88  1,218,885.06 
5035+340.00  2.29  4.59  10.00  45.88  1,218,839.18 
5035+360.00  2.29  4.59  10.00  45.88  1,218,793.30 
5035+380.00  2.29  4.59  10.00  45.88  1,218,747.42 
5035+400.00  2.29  4.59  10.00  45.88  1,218,701.54 
5035+420.00  2.30  4.59  10.00  45.89  1,218,655.65 
5035+440.00  2.30  4.59  10.00  45.90  1,218,609.75 
5035+460.00  2.30  4.59  10.00  45.90  1,218,563.85 
5035+480.00  2.30  4.59  10.00  45.90  1,218,517.95 
5035+500.00  2.30  4.59  10.00  45.90  1,218,472.05 
5035+520.00  2.30  4.59  10.00  45.90  1,218,426.15 
5035+540.00  2.29  4.59  10.00  45.89  1,218,380.26 
5035+560.00  2.29  4.59  10.00  45.88  1,218,334.38 
5035+580.00  2.30  4.59  10.00  45.89  1,218,288.49 
5035+600.00  2.29  4.59  10.00  45.89  1,218,242.60 
5035+620.00  2.30  4.59  10.00  45.89  1,218,196.71 
5035+640.00  2.29  4.59  10.00  45.89  1,218,150.82 
5035+660.00  2.30  4.59  10.00  45.89  1,218,104.93 
5035+680.00  2.29  4.59  10.00  45.89  1,218,059.04 
5035+700.00  2.30  4.59  10.00  45.89  1,218,013.15 
5035+720.00  2.29  4.59  10.00  45.89  1,217,967.26 
5035+740.00  2.30  4.59  10.00  45.89  1,217,921.37 
5035+760.00  2.30  4.59  10.00  45.90  1,217,875.47 
5035+780.00  2.30  4.59  10.00  45.90  1,217,829.57 
5035+800.00  2.30  4.59  10.00  45.90  1,217,783.67 
5035+820.00  2.29  4.59  10.00  45.89  1,217,737.78 
5035+840.00  2.30  4.59  10.00  45.89  1,217,691.89 
5035+860.00  2.30  4.59  10.00  45.90  1,217,645.99 
5035+880.00  2.29  4.59  10.00  45.89  1,217,600.10 
5035+900.00  2.29  4.59  10.00  45.88  1,217,554.22 
5035+920.00  2.29  4.59  10.00  45.88  1,217,508.34 
5035+940.00  2.29  4.59  10.00  45.88  1,217,462.46 
5035+960.00  2.29  4.59  10.00  45.88  1,217,416.58 
5035+980.00  2.29  4.59  10.00  45.88  1,217,370.70 
5036+000.00  2.29  4.59  10.00  45.88  1,217,324.82 
5036+000.00  2.29  4.59  0.00  0.00  1,217,324.82 

608 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5036+020.00  2.29  4.59  10.00  45.88  1,217,278.94 


5036+040.00  2.29  4.59  10.00  45.88  1,217,233.06 
5036+060.00  2.29  4.59  10.00  45.88  1,217,187.18 
5036+080.00  2.29  4.59  10.00  45.88  1,217,141.30 
5036+100.00  2.29  4.59  10.00  45.88  1,217,095.42 
5036+120.00  2.29  4.59  10.00  45.88  1,217,049.54 
5036+140.00  2.29  4.59  10.00  45.88  1,217,003.66 
5036+160.00  2.29  4.59  10.00  45.88  1,216,957.78 
5036+180.00  2.29  4.59  10.00  45.88  1,216,911.90 
5036+200.00  2.29  4.59  10.00  45.88  1,216,866.02 
5036+220.00  2.29  4.59  10.00  45.88  1,216,820.14 
5036+240.00  2.29  4.59  10.00  45.88  1,216,774.26 
5036+260.00  2.29  4.59  10.00  45.88  1,216,728.38 
5036+280.00  2.29  4.59  10.00  45.88  1,216,682.50 
5036+300.00  2.29  4.59  10.00  45.88  1,216,636.62 
5036+320.00  2.29  4.59  10.00  45.88  1,216,590.74 
5036+340.00  2.29  4.59  10.00  45.88  1,216,544.86 
5036+360.00  2.29  4.59  10.00  45.88  1,216,498.98 
5036+360.00  2.29  4.59  0.00  0.00  1,216,498.98 
5036+380.00  2.29  4.59  10.00  45.88  1,216,453.10 
5036+400.00  2.29  4.59  10.00  45.88  1,216,407.22 
5036+420.00  2.29  4.59  10.00  45.88  1,216,361.34 
5036+440.00  2.29  4.59  10.00  45.88  1,216,315.46 
5036+460.00  2.29  4.59  10.00  45.88  1,216,269.58 
5036+480.00  2.29  4.59  10.00  45.88  1,216,223.70 
5036+500.00  2.29  4.59  10.00  45.88  1,216,177.82 
5036+500.00  2.29  4.59  0.00  0.00  1,216,177.82 
5036+520.00  2.29  4.59  10.00  45.88  1,216,131.94 
5036+540.00  2.29  4.59  10.00  45.88  1,216,086.06 
5036+560.00  2.29  4.59  10.00  45.88  1,216,040.18 
5036+580.00  2.29  4.59  10.00  45.88  1,215,994.30 
5036+600.00  2.29  4.59  10.00  45.88  1,215,948.42 
5036+620.00  2.29  4.59  10.00  45.88  1,215,902.54 
5036+640.00  2.29  4.59  10.00  45.88  1,215,856.66 
5036+660.00  2.29  4.59  10.00  45.88  1,215,810.78 
5036+680.00  2.29  4.59  10.00  45.88  1,215,764.90 
5036+700.00  2.29  4.59  10.00  45.88  1,215,719.02 
5036+720.00  2.29  4.59  10.00  45.88  1,215,673.14 
5036+740.00  2.29  4.59  10.00  45.88  1,215,627.26 
5036+760.00  2.29  4.59  10.00  45.88  1,215,581.38 
5036+780.00  2.29  4.59  10.00  45.88  1,215,535.50 
5036+800.00  2.29  4.59  10.00  45.88  1,215,489.62 
5036+820.00  2.29  4.59  10.00  45.88  1,215,443.74 
5036+840.00  2.29  4.59  10.00  45.88  1,215,397.86 
5036+860.00  2.29  4.59  10.00  45.88  1,215,351.98 

609 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5036+880.00  2.29  4.59  10.00  45.88  1,215,306.10 


5036+900.00  2.29  4.59  10.00  45.88  1,215,260.22 
5036+920.00  2.29  4.59  10.00  45.88  1,215,214.34 
5036+940.00  2.29  4.59  10.00  45.88  1,215,168.46 
5036+960.00  2.29  4.59  10.00  45.88  1,215,122.58 
5036+980.00  2.29  4.59  10.00  45.88  1,215,076.70 
5037+000.00  2.29  4.59  10.00  45.88  1,215,030.82 
5037+020.00  2.29  4.59  10.00  45.88  1,214,984.94 
5037+040.00  2.29  4.59  10.00  45.88  1,214,939.06 
5037+060.00  2.29  4.59  10.00  45.88  1,214,893.18 
5037+080.00  2.29  4.59  10.00  45.88  1,214,847.30 
5037+100.00  2.29  4.59  10.00  45.88  1,214,801.42 
5037+120.00  2.29  4.59  10.00  45.88  1,214,755.54 
5037+140.00  2.29  4.59  10.00  45.88  1,214,709.66 
5037+160.00  2.29  4.59  10.00  45.88  1,214,663.78 
5037+180.00  2.29  4.59  10.00  45.88  1,214,617.90 
5037+200.00  2.29  4.59  10.00  45.88  1,214,572.02 
5037+220.00  2.29  4.59  10.00  45.88  1,214,526.14 
5037+240.00  2.29  4.59  10.00  45.88  1,214,480.26 
5037+260.00  2.29  4.59  10.00  45.88  1,214,434.38 
5037+280.00  2.29  4.59  10.00  45.88  1,214,388.50 
5037+300.00  2.29  4.59  10.00  45.88  1,214,342.62 
5037+320.00  2.29  4.59  10.00  45.88  1,214,296.74 
5037+340.00  2.29  4.59  10.00  45.88  1,214,250.86 
5037+360.00  2.29  4.59  10.00  45.88  1,214,204.98 
5037+380.00  2.29  4.59  10.00  45.88  1,214,159.10 
5037+400.00  2.29  4.59  10.00  45.88  1,214,113.22 
5037+420.00  2.29  4.59  10.00  45.88  1,214,067.34 
5037+440.00  2.29  4.59  10.00  45.88  1,214,021.46 
5037+460.00  2.29  4.59  10.00  45.88  1,213,975.58 
5037+480.00  2.29  4.59  10.00  45.88  1,213,929.70 
5037+500.00  2.29  4.59  10.00  45.88  1,213,883.82 
5037+520.00  2.29  4.59  10.00  45.88  1,213,837.94 
5037+540.00  2.29  4.59  10.00  45.88  1,213,792.06 
5037+560.00  2.30  4.59  10.00  45.89  1,213,746.17 
5037+580.00  2.30  4.59  10.00  45.90  1,213,700.27 
5037+600.00  2.29  4.59  10.00  45.89  1,213,654.38 
5037+620.00  2.29  4.59  10.00  45.88  1,213,608.50 
5037+640.00  2.30  4.59  10.00  45.89  1,213,562.61 
5037+660.00  2.29  4.59  10.00  45.89  1,213,516.72 
5037+680.00  2.29  4.59  10.00  45.88  1,213,470.84 
5037+700.00  2.30  4.59  10.00  45.89  1,213,424.95 
5037+720.00  2.29  4.59  10.00  45.89  1,213,379.06 
5037+740.00  2.30  4.59  10.00  45.89  1,213,333.17 
5037+760.00  2.30  4.59  10.00  45.90  1,213,287.27 

610 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5037+780.00  2.30  4.59  10.00  45.90  1,213,241.37 


5037+800.00  2.30  4.59  10.00  45.90  1,213,195.47 
5037+820.00  2.29  4.59  10.00  45.89  1,213,149.58 
5037+840.00  2.30  4.59  10.00  45.89  1,213,103.69 
5037+860.00  2.30  4.59  10.00  45.90  1,213,057.79 
5037+880.00  2.30  4.59  10.00  45.90  1,213,011.89 
5037+900.00  2.29  4.59  10.00  45.89  1,212,966.00 
5037+920.00  2.30  4.59  10.00  45.89  1,212,920.11 
5037+940.00  2.30  4.59  10.00  45.90  1,212,874.21 
5037+960.00  2.30  4.59  10.00  45.90  1,212,828.31 
5037+980.00  2.29  4.59  10.00  45.89  1,212,782.42 
5038+000.00  2.30  4.59  10.00  45.89  1,212,736.53 
5038+020.00  2.30  4.59  10.00  45.90  1,212,690.63 
5038+040.00  2.29  4.59  10.00  45.89  1,212,644.74 
5038+060.00  2.30  4.59  10.00  45.89  1,212,598.85 
5038+080.00  2.30  4.59  10.00  45.90  1,212,552.95 
5038+100.00  2.29  4.59  10.00  45.89  1,212,507.06 
5038+120.00  2.30  4.59  10.00  45.89  1,212,461.17 
5038+140.00  2.30  4.59  10.00  45.90  1,212,415.27 
5038+160.00  2.29  4.59  10.00  45.89  1,212,369.38 
5038+180.00  2.30  4.59  10.00  45.89  1,212,323.49 
5038+200.00  2.30  4.59  10.00  45.90  1,212,277.59 
5038+220.00  2.30  4.59  10.00  45.90  1,212,231.69 
5038+240.00  2.30  4.59  10.00  45.90  1,212,185.79 
5038+260.00  2.30  4.59  10.00  45.90  1,212,139.89 
5038+280.00  2.30  4.59  10.00  45.90  1,212,093.99 
5038+300.00  2.30  4.59  10.00  45.90  1,212,048.09 
5038+320.00  2.29  4.59  10.00  45.89  1,212,002.20 
5038+340.00  2.30  4.59  10.00  45.89  1,211,956.31 
5038+360.00  2.29  4.59  10.00  45.89  1,211,910.42 
5038+380.00  2.29  4.59  10.00  45.88  1,211,864.54 
5038+400.00  2.29  4.59  10.00  45.88  1,211,818.66 
5038+420.00  2.29  4.59  10.00  45.88  1,211,772.78 
5038+440.00  2.29  4.59  10.00  45.88  1,211,726.90 
5038+460.00  2.29  4.59  10.00  45.88  1,211,681.02 
5038+480.00  2.29  4.59  10.00  45.88  1,211,635.14 
5038+500.00  2.29  4.59  10.00  45.88  1,211,589.26 
5038+520.00  2.29  4.59  10.00  45.88  1,211,543.38 
5038+540.00  2.29  4.59  10.00  45.88  1,211,497.50 
5038+560.00  2.29  4.59  10.00  45.88  1,211,451.62 
5038+580.00  2.29  4.59  10.00  45.88  1,211,405.74 
5038+600.00  2.29  4.59  10.00  45.88  1,211,359.86 
5038+620.00  2.29  4.59  10.00  45.88  1,211,313.98 
5038+640.00  2.29  4.59  10.00  45.88  1,211,268.10 
5038+660.00  2.29  4.59  10.00  45.88  1,211,222.22 

611 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5038+680.00  2.29  4.59  10.00  45.88  1,211,176.34 


5038+700.00  2.29  4.59  10.00  45.88  1,211,130.46 
5038+720.00  2.29  4.59  10.00  45.88  1,211,084.58 
5038+740.00  2.29  4.59  10.00  45.88  1,211,038.70 
5038+760.00  2.30  4.59  10.00  45.89  1,210,992.81 
5038+780.00  2.30  4.59  10.00  45.90  1,210,946.91 
5038+800.00  2.29  4.59  10.00  45.89  1,210,901.02 
5038+820.00  2.29  4.59  10.00  45.88  1,210,855.14 
5038+840.00  2.29  4.59  10.00  45.88  1,210,809.26 
5038+860.00  2.30  4.59  10.00  45.89  1,210,763.37 
5038+880.00  2.30  4.59  10.00  45.90  1,210,717.47 
5038+900.00  2.29  4.59  10.00  45.89  1,210,671.58 
5038+920.00  2.29  4.59  10.00  45.88  1,210,625.70 
5038+940.00  2.29  4.59  10.00  45.88  1,210,579.82 
5038+960.00  2.29  4.59  10.00  45.88  1,210,533.94 
5038+980.00  2.29  4.59  10.00  45.88  1,210,488.06 
5039+000.00  2.29  4.59  10.00  45.88  1,210,442.18 
5039+020.00  2.29  4.59  10.00  45.88  1,210,396.30 
5039+040.00  2.29  4.59  10.00  45.88  1,210,350.42 
5039+060.00  2.29  4.59  10.00  45.88  1,210,304.54 
5039+080.00  2.30  4.59  10.00  45.89  1,210,258.65 
5039+100.00  2.30  4.59  10.00  45.90  1,210,212.75 
5039+120.00  2.29  4.59  10.00  45.89  1,210,166.86 
5039+140.00  2.29  4.59  10.00  45.88  1,210,120.98 
5039+160.00  2.29  4.59  10.00  45.88  1,210,075.10 
5039+180.00  2.30  4.59  10.00  45.89  1,210,029.21 
5039+200.00  2.30  4.59  10.00  45.90  1,209,983.31 
5039+220.00  2.29  4.59  10.00  45.89  1,209,937.42 
5039+240.00  2.29  4.59  10.00  45.88  1,209,891.54 
5039+260.00  2.29  4.59  10.00  45.88  1,209,845.66 
5039+280.00  2.29  4.59  10.00  45.88  1,209,799.78 
5039+300.00  2.29  4.59  10.00  45.88  1,209,753.90 
5039+301.44  2.29  4.59  0.72  3.30  1,209,750.59 
5039+320.00  2.27  4.57  9.28  42.39  1,209,708.20 
5039+340.00  2.25  4.53  10.00  45.27  1,209,662.93 
5039+351.44  2.24  4.49  5.72  25.70  1,209,637.23 
5039+360.00  2.24  4.48  4.28  19.18  1,209,618.06 
5039+380.00  2.24  4.48  10.00  44.80  1,209,573.26 
5039+400.00  2.24  4.48  10.00  44.80  1,209,528.46 
5039+420.00  2.24  4.48  10.00  44.80  1,209,483.66 
5039+440.00  2.24  4.48  10.00  44.80  1,209,438.86 
5039+441.77  2.24  4.48  0.88  3.96  1,209,434.90 
5039+460.00  2.26  4.50  9.12  41.03  1,209,393.87 
5039+480.00  2.28  4.54  10.00  45.41  1,209,348.46 
5039+491.77  2.29  4.58  5.88  26.91  1,209,321.55 

612 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5039+500.00  2.29  4.59  4.12  18.89  1,209,302.66 


5039+520.00  2.29  4.59  10.00  45.88  1,209,256.78 
5039+540.00  2.29  4.59  10.00  45.88  1,209,210.90 
5039+560.00  2.29  4.59  10.00  45.88  1,209,165.02 
5039+580.00  2.29  4.59  10.00  45.88  1,209,119.14 
5039+600.00  2.29  4.59  10.00  45.88  1,209,073.26 
5039+620.00  2.29  4.59  10.00  45.88  1,209,027.38 
5039+640.00  2.29  4.59  10.00  45.88  1,208,981.50 
5039+660.00  2.29  4.59  10.00  45.88  1,208,935.62 
5039+680.00  2.29  4.59  10.00  45.88  1,208,889.74 
5039+700.00  2.29  4.59  10.00  45.88  1,208,843.86 
5039+720.00  2.29  4.59  10.00  45.88  1,208,797.98 
5039+740.00  2.29  4.59  10.00  45.88  1,208,752.10 
5039+760.00  2.29  4.59  10.00  45.88  1,208,706.22 
5039+780.00  2.29  4.59  10.00  45.88  1,208,660.34 
5039+800.00  2.29  4.59  10.00  45.88  1,208,614.46 
5039+820.00  2.29  4.59  10.00  45.88  1,208,568.58 
5039+840.00  2.29  4.59  10.00  45.88  1,208,522.70 
5039+860.00  2.29  4.59  10.00  45.88  1,208,476.82 
5039+880.00  2.29  4.59  10.00  45.88  1,208,430.94 
5039+900.00  2.29  4.59  10.00  45.88  1,208,385.06 
5039+920.00  2.29  4.59  10.00  45.88  1,208,339.18 
5039+940.00  2.29  4.59  10.00  45.88  1,208,293.30 
5039+960.00  2.29  4.59  10.00  45.88  1,208,247.42 
5039+980.00  2.29  4.59  10.00  45.88  1,208,201.54 
5040+000.00  2.29  4.59  10.00  45.88  1,208,155.66 
5040+020.00  2.29  4.59  10.00  45.88  1,208,109.78 
5040+040.00  2.29  4.59  10.00  45.88  1,208,063.90 
5040+060.00  2.29  4.59  10.00  45.88  1,208,018.02 
5040+080.00  2.29  4.59  10.00  45.88  1,207,972.14 
5040+100.00  2.29  4.59  10.00  45.88  1,207,926.26 
5040+120.00  2.30  4.59  10.00  45.89  1,207,880.37 
5040+140.00  2.30  4.59  10.00  45.90  1,207,834.47 
5040+160.00  2.29  4.59  10.00  45.89  1,207,788.58 
5040+180.00  2.29  4.59  10.00  45.88  1,207,742.70 
5040+200.00  2.30  4.59  10.00  45.89  1,207,696.81 
5040+220.00  2.30  4.59  10.00  45.90  1,207,650.91 
5040+240.00  2.29  4.59  10.00  45.89  1,207,605.02 
5040+260.00  2.30  4.59  10.00  45.89  1,207,559.13 
5040+280.00  2.30  4.59  10.00  45.90  1,207,513.23 
5040+300.00  2.30  4.59  10.00  45.90  1,207,467.33 
5040+320.00  2.30  4.59  10.00  45.90  1,207,421.43 
5040+340.00  2.29  4.59  10.00  45.89  1,207,375.54 
5040+360.00  2.29  4.59  10.00  45.88  1,207,329.66 
5040+380.00  2.30  4.59  10.00  45.89  1,207,283.77 

613 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5040+400.00  2.30  4.59  10.00  45.90  1,207,237.87 


5040+420.00  2.30  4.59  10.00  45.90  1,207,191.97 
5040+440.00  2.29  4.59  10.00  45.89  1,207,146.08 
5040+460.00  2.30  4.59  10.00  45.89  1,207,100.19 
5040+480.00  2.30  4.59  10.00  45.90  1,207,054.29 
5040+500.00  2.30  4.59  10.00  45.90  1,207,008.39 
5040+520.00  2.30  4.59  10.00  45.90  1,206,962.49 
5040+540.00  2.30  4.59  10.00  45.90  1,206,916.59 
5040+540.00  2.30  4.59  0.00  0.00  1,206,916.59 
5040+540.00  2.51  4.80  0.00  0.00  1,206,916.59 
5040+560.00  2.51  5.02  10.00  50.16  1,206,866.43 
5040+571.00  2.51  5.02  5.50  27.59  1,206,838.84 
5040+571.00  2.51  5.02  0.00  0.00  1,206,838.84 
5040+571.00  2.30  4.80  0.00  0.00  1,206,838.84 
5040+580.00  2.29  4.59  4.50  20.65  1,206,818.19 
5040+600.00  2.29  4.59  10.00  45.88  1,206,772.31 
5040+620.00  2.29  4.59  10.00  45.88  1,206,726.43 
5040+640.00  2.29  4.59  10.00  45.88  1,206,680.55 
5040+660.00  2.29  4.59  10.00  45.88  1,206,634.67 
5040+680.00  2.29  4.59  10.00  45.88  1,206,588.79 
5040+700.00  2.29  4.59  10.00  45.88  1,206,542.91 
5040+720.00  2.29  4.59  10.00  45.88  1,206,497.03 
5040+740.00  2.29  4.59  10.00  45.88  1,206,451.15 
5040+760.00  2.29  4.59  10.00  45.88  1,206,405.27 
5040+780.00  2.29  4.59  10.00  45.88  1,206,359.39 
5040+800.00  2.29  4.59  10.00  45.88  1,206,313.51 
5040+820.00  2.29  4.59  10.00  45.88  1,206,267.63 
5040+840.00  2.29  4.59  10.00  45.88  1,206,221.75 
5040+860.00  2.29  4.59  10.00  45.88  1,206,175.87 
5040+880.00  2.29  4.59  10.00  45.88  1,206,129.99 
5040+900.00  2.29  4.59  10.00  45.88  1,206,084.11 
5040+920.00  2.29  4.59  10.00  45.88  1,206,038.23 
5040+940.00  2.29  4.59  10.00  45.88  1,205,992.35 
5040+960.00  2.29  4.59  10.00  45.88  1,205,946.47 
5040+980.00  2.29  4.59  10.00  45.88  1,205,900.59 
5041+000.00  2.29  4.59  10.00  45.88  1,205,854.71 
5041+020.00  2.29  4.59  10.00  45.88  1,205,808.83 
5041+040.00  2.29  4.59  10.00  45.88  1,205,762.95 
5041+060.00  2.29  4.59  10.00  45.88  1,205,717.07 
5041+080.00  2.29  4.59  10.00  45.88  1,205,671.19 
5041+100.00  2.29  4.59  10.00  45.88  1,205,625.31 
5041+120.00  2.29  4.59  10.00  45.88  1,205,579.43 
5041+140.00  2.29  4.59  10.00  45.88  1,205,533.55 
5041+160.00  2.29  4.59  10.00  45.88  1,205,487.67 
5041+180.00  2.29  4.59  10.00  45.88  1,205,441.79 

614 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5041+200.00  2.29  4.59  10.00  45.88  1,205,395.91 


5041+200.00  2.29  4.59  0.00  0.00  1,205,395.91 
5041+220.00  2.29  4.59  10.00  45.88  1,205,350.03 
5041+235.00  2.29  4.59  7.50  34.41  1,205,315.62 
5041+235.00  2.29  4.59  0.00  0.00  1,205,315.62 
5041+235.00  2.51  4.80  0.00  0.00  1,205,315.62 
5041+240.00  2.51  5.02  2.50  12.54  1,205,303.08 
5041+250.00  2.51  5.02  5.00  25.08  1,205,278.00 
5041+250.00  2.51  5.02  0.00  0.00  1,205,278.00 
5041+260.00  2.51  5.02  5.00  25.08  1,205,252.92 
5041+268.00  2.51  5.02  4.00  20.06  1,205,232.86 
5041+268.00  2.51  5.02  0.00  0.00  1,205,232.86 
5041+268.00  2.29  4.80  0.00  0.00  1,205,232.86 
5041+280.00  2.29  4.59  6.00  27.53  1,205,205.33 
5041+300.00  2.29  4.59  10.00  45.88  1,205,159.45 
5041+320.00  2.29  4.59  10.00  45.88  1,205,113.57 
5041+340.00  2.29  4.59  10.00  45.88  1,205,067.69 
5041+360.00  2.29  4.59  10.00  45.88  1,205,021.81 
5041+370.00  2.29  4.59  5.00  22.94  1,204,998.87 
5041+370.00  2.29  4.59  0.00  0.00  1,204,998.87 
5041+370.00  2.51  4.80  0.00  0.00  1,204,998.87 
5041+380.00  2.51  5.02  5.00  25.08  1,204,973.79 
5041+400.00  2.51  5.02  10.00  50.16  1,204,923.63 
5041+402.00  2.51  5.02  1.00  5.01  1,204,918.62 
5041+402.00  2.51  5.02  0.00  0.00  1,204,918.61 
5041+402.00  2.51  5.02  0.00  0.00  1,204,918.61 
5041+402.00  2.30  4.80  0.00  0.00  1,204,918.61 
5041+420.00  2.30  4.59  9.00  41.31  1,204,877.30 
5041+440.00  2.30  4.59  10.00  45.90  1,204,831.40 
5041+460.00  2.30  4.59  10.00  45.90  1,204,785.50 
5041+480.00  2.30  4.59  10.00  45.90  1,204,739.60 
5041+500.00  2.30  4.59  10.00  45.90  1,204,693.70 
5041+520.00  2.30  4.59  10.00  45.90  1,204,647.80 
5041+540.00  2.30  4.59  10.00  45.90  1,204,601.90 
5041+560.00  2.30  4.59  10.00  45.90  1,204,556.00 
5041+580.00  2.30  4.59  10.00  45.90  1,204,510.10 
5041+600.00  2.29  4.59  10.00  45.89  1,204,464.21 
5041+620.00  2.29  4.59  10.00  45.88  1,204,418.33 
5041+640.00  2.29  4.59  10.00  45.88  1,204,372.45 
5041+660.00  2.30  4.59  10.00  45.89  1,204,326.56 
5041+680.00  2.30  4.59  10.00  45.90  1,204,280.66 
5041+700.00  2.30  4.59  10.00  45.90  1,204,234.76 
5041+720.00  2.30  4.59  10.00  45.90  1,204,188.86 
5041+740.00  2.30  4.59  10.00  45.90  1,204,142.96 
5041+760.00  2.30  4.59  10.00  45.90  1,204,097.06 

615 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5041+780.00  2.30  4.59  10.00  45.90  1,204,051.16 


5041+800.00  2.30  4.59  10.00  45.90  1,204,005.26 
5041+820.00  2.30  4.59  10.00  45.90  1,203,959.36 
5041+840.00  2.30  4.59  10.00  45.90  1,203,913.46 
5041+860.00  2.30  4.59  10.00  45.90  1,203,867.56 
5041+880.00  2.30  4.59  10.00  45.90  1,203,821.66 
5041+900.00  2.29  4.59  10.00  45.89  1,203,775.77 
5041+920.00  2.29  4.59  10.00  45.88  1,203,729.89 
5041+940.00  2.29  4.59  10.00  45.88  1,203,684.01 
5041+960.00  2.29  4.59  10.00  45.88  1,203,638.13 
5041+980.00  2.29  4.59  10.00  45.88  1,203,592.25 
5042+000.00  2.29  4.59  10.00  45.88  1,203,546.37 
5042+002.37  2.29  4.59  1.18  5.43  1,203,540.94 
5042+020.00  2.29  4.59  8.82  40.45  1,203,500.49 
5042+032.37  2.29  4.59  6.18  28.37  1,203,472.12 
5042+040.00  2.29  4.59  3.82  17.51  1,203,454.61 
5042+060.00  2.29  4.59  10.00  45.88  1,203,408.73 
5042+080.00  2.29  4.59  10.00  45.88  1,203,362.85 
5042+100.00  2.29  4.59  10.00  45.88  1,203,316.97 
5042+120.00  2.29  4.59  10.00  45.88  1,203,271.09 
5042+120.89  2.29  4.59  0.44  2.04  1,203,269.05 
5042+140.00  2.29  4.59  9.56  43.84  1,203,225.21 
5042+150.89  2.29  4.59  5.44  24.98  1,203,200.23 
5042+160.00  2.29  4.59  4.56  20.90  1,203,179.33 
5042+180.00  2.29  4.59  10.00  45.88  1,203,133.45 
5042+200.00  2.29  4.59  10.00  45.88  1,203,087.57 
5042+220.00  2.29  4.59  10.00  45.88  1,203,041.69 
5042+240.00  2.29  4.59  10.00  45.88  1,202,995.81 
5042+260.00  2.29  4.59  10.00  45.88  1,202,949.93 
5042+280.00  2.29  4.59  10.00  45.88  1,202,904.05 
5042+300.00  2.29  4.59  10.00  45.88  1,202,858.17 
5042+320.00  2.29  4.59  10.00  45.88  1,202,812.29 
5042+340.00  2.29  4.59  10.00  45.88  1,202,766.41 
5042+360.00  2.29  4.59  10.00  45.88  1,202,720.53 
5042+380.00  2.29  4.59  10.00  45.88  1,202,674.65 
5042+400.00  2.29  4.59  10.00  45.88  1,202,628.77 
5042+420.00  2.29  4.59  10.00  45.88  1,202,582.89 
5042+440.00  2.29  4.59  10.00  45.88  1,202,537.01 
5042+460.00  2.29  4.59  10.00  45.88  1,202,491.13 
5042+460.03  2.29  4.59  0.01  0.07  1,202,491.07 
5042+470.00  2.32  4.61  4.99  22.98  1,202,468.09 
5042+480.00  2.30  4.61  5.00  23.05  1,202,445.04 
5042+480.03  2.30  4.59  0.01  0.07  1,202,444.97 
5042+490.00  2.30  4.59  4.99  22.88  1,202,422.09 
5042+500.00  2.30  4.59  5.00  22.95  1,202,399.14 

616 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5000+000 AL 5043+000   

5042+510.00  2.30  4.59  5.00  22.95  1,202,376.19 


5042+520.00  2.30  4.59  5.00  22.95  1,202,353.24 
5042+530.00  2.30  4.59  5.00  22.95  1,202,330.29 
5042+540.00  2.30  4.59  5.00  22.95  1,202,307.34 
5042+550.00  2.30  4.59  5.00  22.95  1,202,284.39 
5042+560.00  2.30  4.59  5.00  22.95  1,202,261.44 
5042+570.00  2.30  4.59  5.00  22.95  1,202,238.49 
5042+580.00  2.30  4.59  5.00  22.95  1,202,215.54 
5042+590.00  2.30  4.59  5.00  22.95  1,202,192.59 
5042+600.00  2.30  4.59  5.00  22.95  1,202,169.64 
5042+600.00  2.30  4.59  0.00  0.00  1,202,169.64 
5042+610.00  2.30  4.59  5.00  22.95  1,202,146.69 
5042+620.00  2.30  4.59  5.00  22.95  1,202,123.74 
5042+630.00  2.30  4.59  5.00  22.95  1,202,100.79 
5042+640.00  2.30  4.59  5.00  22.95  1,202,077.84 
5042+650.00  2.30  4.59  5.00  22.95  1,202,054.89 
5042+660.00  2.30  4.59  5.00  22.95  1,202,031.94 
5042+680.00  2.30  4.59  10.00  45.90  1,201,986.04 
5042+700.00  2.30  4.59  10.00  45.90  1,201,940.14 
5042+720.00  2.30  4.59  10.00  45.90  1,201,894.24 
5042+740.00  2.30  4.59  10.00  45.90  1,201,848.34 
5042+760.00  2.30  4.59  10.00  45.90  1,201,802.44 
5042+780.00  2.30  4.59  10.00  45.90  1,201,756.54 
5042+800.00  2.30  4.59  10.00  45.90  1,201,710.64 
5042+800.00  2.30  4.59  0.00  0.00  1,201,710.64 
5042+820.00  2.30  4.59  10.00  45.90  1,201,664.74 
5042+840.00  2.30  4.59  10.00  45.90  1,201,618.84 
5042+860.00  2.30  4.59  10.00  45.90  1,201,572.94 
5042+862.97  2.30  4.59  1.48  6.82  1,201,566.12 
5042+880.00  2.33  4.62  8.52  39.36  1,201,526.77 
5042+900.00  2.37  4.69  10.00  46.92  1,201,479.85 
5042+920.00  2.41  4.77  10.00  47.70  1,201,432.15 
5042+940.00  2.45  4.85  10.00  48.50  1,201,383.65 
5042+960.00  2.49  4.93  10.00  49.31  1,201,334.34 
5042+980.00  2.53  5.01  10.00  50.13  1,201,284.21 
5043+000.00  2.57  5.10  10.00  50.97  1,201,233.24 
 

617 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TABLA 41 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 5007+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.17   

0+009.48  0.02  0.02        1,300,000.00 


0+010.00  0.02  0.04  0.26  0.01  1,299,999.99 
0+018.10  0.06  0.08  4.05  0.34  1,299,999.65 
0+020.00  0.08  0.14  0.95  0.13  1,299,999.52 
0+020.00  0.08  0.16  0.00  0.00  1,299,999.52 
0+026.06  0.13  0.21  3.03  0.64  1,299,998.88 
0+030.00  0.18  0.31  1.97  0.61  1,299,998.28 
0+033.49  0.22  0.40  1.75  0.69  1,299,997.59 
0+040.00  0.32  0.54  3.25  1.74  1,299,995.84 
0+040.01  0.32  0.63  0.00  0.00  1,299,995.84 
0+040.49  0.32  0.64  0.24  0.15  1,299,995.68 
0+041.50  0.34  0.67  0.51  0.34  1,299,995.35 
0+046.72  0.44  0.78  2.61  2.02  1,299,993.32 
0+050.01  0.50  0.94  1.65  1.54  1,299,991.78 
0+052.57  0.56  1.06  1.28  1.35  1,299,990.43 
0+055.87  0.63  1.19  1.65  1.95  1,299,988.48 
0+057.77  0.68  1.31  0.95  1.24  1,299,987.24 
0+059.92  0.73  1.41  1.07  1.51  1,299,985.73 
0+060.00  0.73  1.46  0.04  0.06  1,299,985.67 
0+060.03  0.73  1.46  0.01  0.02  1,299,985.65 
0+062.24  0.79  1.52  1.11  1.69  1,299,983.97 
0+064.02  0.84  1.62  0.89  1.44  1,299,982.52 
0+067.52  0.93  1.76  1.75  3.09  1,299,979.44 
0+070.04  0.99  1.92  1.26  2.41  1,299,977.03 
0+073.35  1.08  2.07  1.66  3.43  1,299,973.59 
0+077.97  1.20  2.28  2.31  5.27  1,299,968.32 
0+079.83  1.25  2.46  0.93  2.28  1,299,966.04 
0+080.00  1.26  2.51  0.08  0.21  1,299,965.83 
0+080.05  1.26  2.52  0.02  0.06  1,299,965.76 
0+088.91  1.50  2.76  4.43  12.24  1,299,953.52 
0+090.06  1.54  3.04  0.57  1.75  1,299,951.78 
0+098.16  1.76  3.30  4.05  13.35  1,299,938.43 
0+100.00  1.82  3.58  0.92  3.30  1,299,935.13 
0+100.08  1.82  3.63  0.04  0.14  1,299,935.00 
0+100.17  1.82  3.64  0.05  0.17  1,299,934.83 
0+107.56  1.99  3.81  3.69  14.06  1,299,920.76 
0+110.09  2.03  4.02  1.26  5.08  1,299,915.68 
0+117.14  2.13  4.16  3.53  14.68  1,299,901.00 
0+120.00  2.16  4.29  1.43  6.14  1,299,894.85 
0+120.09  2.16  4.32  0.05  0.20  1,299,894.65 
0+126.84  2.22  4.38  3.37  14.77  1,299,879.88 
0+130.10  2.23  4.45  1.63  7.24  1,299,872.64 
0+136.65  2.26  4.49  3.27  14.72  1,299,857.92 

618 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.17   

0+140.00  2.27  4.53  1.68  7.59  1,299,850.33 


0+140.10  2.27  4.54  0.05  0.22  1,299,850.11 
0+146.53  2.28  4.55  3.22  14.65  1,299,835.46 
0+150.10  2.29  4.57  1.78  8.15  1,299,827.31 
0+156.50  2.29  4.58  3.20  14.66  1,299,812.65 
0+160.00  2.29  4.59  1.75  8.04  1,299,804.62 
0+160.09  2.29  4.59  0.04  0.19  1,299,804.42 
0+160.10  2.29  4.59  0.01  0.03  1,299,804.39 
0+166.51  2.29  4.59  3.21  14.71  1,299,789.68 
0+170.10  2.29  4.59  1.79  8.23  1,299,781.45 
0+180.00  2.29  4.59  4.95  22.71  1,299,758.74 
0+182.92  2.29  4.59  1.46  6.70  1,299,752.04 
0+190.10  2.29  4.59  3.59  16.47  1,299,735.57 
0+200.00  2.29  4.59  4.95  22.71  1,299,712.86 
0+202.92  2.29  4.59  1.46  6.70  1,299,706.16 
0+210.10  2.29  4.59  3.59  16.47  1,299,689.69 
0+220.00  2.29  4.59  4.95  22.71  1,299,666.98 
0+222.92  2.29  4.59  1.46  6.70  1,299,660.28 
0+230.10  2.29  4.59  3.59  16.47  1,299,643.81 
0+240.00  2.29  4.59  4.95  22.71  1,299,621.10 
0+242.92  2.29  4.59  1.46  6.70  1,299,614.40 
0+250.10  2.29  4.59  3.59  16.47  1,299,597.93 
0+260.00  2.29  4.59  4.95  22.71  1,299,575.22 
0+262.92  2.29  4.59  1.46  6.70  1,299,568.52 
0+270.10  2.29  4.59  3.59  16.47  1,299,552.05 
0+280.00  2.29  4.59  4.95  22.71  1,299,529.34 
0+282.92  2.29  4.59  1.46  6.70  1,299,522.64 
0+290.10  2.29  4.59  3.59  16.47  1,299,506.17 
0+300.00  2.29  4.59  4.95  22.71  1,299,483.46 
0+302.92  2.29  4.59  1.46  6.70  1,299,476.76 
0+310.10  2.29  4.59  3.59  16.47  1,299,460.29 
0+320.00  2.29  4.59  4.95  22.71  1,299,437.58 
0+322.92  2.29  4.59  1.46  6.70  1,299,430.88 
0+330.10  2.29  4.59  3.59  16.47  1,299,414.41 
0+340.00  2.29  4.59  4.95  22.71  1,299,391.70 
0+342.92  2.29  4.59  1.46  6.70  1,299,385.00 
0+350.10  2.29  4.59  3.59  16.47  1,299,368.53 
0+360.00  2.29  4.59  4.95  22.71  1,299,345.82 
0+362.92  2.29  4.59  1.46  6.70  1,299,339.12 
0+370.10  2.29  4.59  3.59  16.47  1,299,322.65 
0+380.00  2.29  4.59  4.95  22.71  1,299,299.94 
0+382.92  2.29  4.59  1.46  6.70  1,299,293.24 
0+390.10  2.29  4.59  3.59  16.47  1,299,276.77 
0+400.00  2.29  4.59  4.95  22.71  1,299,254.06 
0+402.92  2.29  4.59  1.46  6.70  1,299,247.36 

619 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.17   

0+410.10  2.29  4.59  3.59  16.47  1,299,230.89 


0+420.00  2.29  4.59  4.95  22.71  1,299,208.18 
0+422.92  2.29  4.59  1.46  6.70  1,299,201.48 
0+430.10  2.29  4.59  3.59  16.47  1,299,185.01 
0+440.00  2.29  4.59  4.95  22.71  1,299,162.30 
0+442.92  2.29  4.59  1.46  6.70  1,299,155.60 
0+450.10  2.29  4.59  3.59  16.47  1,299,139.13 
0+460.00  2.29  4.59  4.95  22.71  1,299,116.42 
0+462.92  2.29  4.59  1.46  6.70  1,299,109.72 
0+470.10  2.29  4.59  3.59  16.47  1,299,093.25 
0+480.00  2.29  4.59  4.95  22.71  1,299,070.54 
0+482.92  2.29  4.59  1.46  6.70  1,299,063.84 
0+490.10  2.29  4.59  3.59  16.47  1,299,047.37 
0+500.00  2.29  4.59  4.95  22.71  1,299,024.66 
0+502.92  2.29  4.59  1.46  6.70  1,299,017.96 
0+510.10  2.29  4.59  3.59  16.47  1,299,001.49 
0+520.00  2.29  4.59  4.95  22.71  1,298,978.78 
0+522.92  2.29  4.59  1.46  6.70  1,298,972.08 
0+530.10  2.29  4.59  3.59  16.47  1,298,955.61 
0+540.00  2.29  4.59  4.95  22.71  1,298,932.90 
0+542.92  2.29  4.59  1.46  6.70  1,298,926.20 
0+550.10  2.29  4.59  3.59  16.47  1,298,909.73 
0+560.00  2.29  4.59  4.95  22.71  1,298,887.02 
0+562.92  2.29  4.59  1.46  6.70  1,298,880.32 
0+570.10  2.29  4.59  3.59  16.47  1,298,863.85 
0+580.00  2.29  4.59  4.95  22.71  1,298,841.14 
0+582.92  2.29  4.59  1.46  6.70  1,298,834.44 
0+590.10  2.29  4.59  3.59  16.47  1,298,817.97 
0+600.00  2.29  4.59  4.95  22.71  1,298,795.26 
0+602.92  2.29  4.59  1.46  6.70  1,298,788.56 
0+610.10  2.29  4.59  3.59  16.47  1,298,772.09 
0+620.00  2.29  4.59  4.95  22.71  1,298,749.38 
0+622.92  2.29  4.59  1.46  6.70  1,298,742.68 
0+630.10  2.29  4.59  3.59  16.47  1,298,726.21 
0+640.00  2.29  4.59  4.95  22.71  1,298,703.50 
0+642.92  2.29  4.59  1.46  6.70  1,298,696.80 
0+650.10  2.29  4.59  3.59  16.47  1,298,680.33 
0+660.00  2.29  4.59  4.95  22.71  1,298,657.62 
0+662.92  2.29  4.59  1.46  6.70  1,298,650.92 
0+670.10  2.29  4.59  3.59  16.47  1,298,634.45 
0+680.00  2.29  4.59  4.95  22.71  1,298,611.74 
0+682.92  2.29  4.59  1.46  6.70  1,298,605.04 
0+690.10  2.29  4.59  3.59  16.47  1,298,588.57 
0+700.00  2.29  4.59  4.95  22.71  1,298,565.86 
0+702.92  2.29  4.59  1.46  6.70  1,298,559.16 

620 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.17   

0+710.10  2.29  4.59  3.59  16.47  1,298,542.69 


0+720.00  2.29  4.59  4.95  22.71  1,298,519.98 
0+722.92  2.29  4.59  1.46  6.70  1,298,513.28 
0+730.10  2.29  4.59  3.59  16.47  1,298,496.81 
0+740.00  2.29  4.59  4.95  22.71  1,298,474.10 
0+742.92  2.29  4.59  1.46  6.70  1,298,467.40 
0+750.10  2.29  4.59  3.59  16.47  1,298,450.93 
0+760.00  2.29  4.59  4.95  22.71  1,298,428.22 
0+762.92  2.29  4.59  1.46  6.70  1,298,421.52 
0+770.10  2.29  4.59  3.59  16.47  1,298,405.05 
0+780.00  2.29  4.59  4.95  22.71  1,298,382.34 
0+782.92  2.29  4.59  1.46  6.70  1,298,375.64 
0+790.10  2.29  4.59  3.59  16.47  1,298,359.17 
0+800.00  2.29  4.59  4.95  22.71  1,298,336.46 
0+802.92  2.29  4.59  1.46  6.70  1,298,329.76 
0+810.10  2.29  4.59  3.59  16.47  1,298,313.29 
0+820.00  2.29  4.59  4.95  22.71  1,298,290.58 
0+822.92  2.29  4.59  1.46  6.70  1,298,283.88 
0+830.10  2.29  4.59  3.59  16.47  1,298,267.41 
0+840.00  2.29  4.59  4.95  22.71  1,298,244.70 
0+842.92  2.29  4.59  1.46  6.70  1,298,238.00 
0+850.10  2.29  4.59  3.59  16.47  1,298,221.53 
0+860.00  2.29  4.59  4.95  22.71  1,298,198.82 
0+862.92  2.29  4.59  1.46  6.70  1,298,192.12 
0+870.10  2.29  4.59  3.59  16.47  1,298,175.65 
0+880.00  2.29  4.59  4.95  22.71  1,298,152.94 
0+882.92  2.29  4.59  1.46  6.70  1,298,146.24 
0+890.10  2.29  4.59  3.59  16.47  1,298,129.77 
0+900.00  2.29  4.59  4.95  22.71  1,298,107.06 
0+902.92  2.29  4.59  1.46  6.70  1,298,100.36 
0+910.10  2.29  4.59  3.59  16.47  1,298,083.89 
0+920.00  2.29  4.59  4.95  22.71  1,298,061.18 
0+922.92  2.29  4.59  1.46  6.70  1,298,054.48 
0+930.10  2.29  4.59  3.59  16.47  1,298,038.01 
0+940.00  2.29  4.59  4.95  22.71  1,298,015.30 
0+942.92  2.29  4.59  1.46  6.70  1,298,008.60 
0+950.10  2.29  4.59  3.59  16.47  1,297,992.13 
0+960.00  2.29  4.59  4.95  22.71  1,297,969.42 
0+962.92  2.29  4.59  1.46  6.70  1,297,962.72 
0+970.10  2.29  4.59  3.59  16.47  1,297,946.25 
0+980.00  2.29  4.59  4.95  22.71  1,297,923.54 
0+982.92  2.29  4.59  1.46  6.70  1,297,916.84 
0+990.10  2.29  4.59  3.59  16.47  1,297,900.37 
1+000.00  2.29  4.59  4.95  22.71  1,297,877.66 
1+002.92  2.29  4.59  1.46  6.70  1,297,870.96 

621 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.17   

1+010.10  2.29  4.59  3.59  16.47  1,297,854.49 


1+020.00  2.29  4.59  4.95  22.71  1,297,831.78 
1+022.92  2.29  4.59  1.46  6.70  1,297,825.08 
1+030.10  2.29  4.59  3.59  16.47  1,297,808.61 
1+040.00  2.29  4.59  4.95  22.71  1,297,785.90 
1+042.92  2.29  4.59  1.46  6.70  1,297,779.20 
1+050.10  2.29  4.59  3.59  16.47  1,297,762.73 
1+060.00  2.29  4.59  4.95  22.71  1,297,740.02 
1+062.92  2.29  4.59  1.46  6.70  1,297,733.32 
1+070.10  2.29  4.59  3.59  16.47  1,297,716.85 
1+080.00  2.29  4.59  4.95  22.71  1,297,694.14 
1+082.92  2.29  4.59  1.46  6.70  1,297,687.44 
1+090.10  2.29  4.59  3.59  16.47  1,297,670.97 
1+100.00  2.29  4.59  4.95  22.71  1,297,648.26 
1+102.92  2.29  4.59  1.46  6.70  1,297,641.56 
1+110.10  2.29  4.59  3.59  16.47  1,297,625.09 
1+120.00  2.29  4.59  4.95  22.71  1,297,602.38 
1+122.92  2.29  4.59  1.46  6.70  1,297,595.68 
1+130.10  2.29  4.59  3.59  16.47  1,297,579.21 
1+140.00  2.29  4.59  4.95  22.71  1,297,556.50 
1+142.92  2.29  4.59  1.46  6.70  1,297,549.80 
1+150.10  2.29  4.59  3.59  16.47  1,297,533.33 
1+160.00  2.29  4.59  4.95  22.71  1,297,510.62 
1+162.92  2.29  4.59  1.46  6.70  1,297,503.92 
1+170.10  2.29  4.59  3.59  16.47  1,297,487.45 
1+180.00  2.29  4.59  4.95  22.71  1,297,464.74 
1+182.92  2.29  4.59  1.46  6.70  1,297,458.04 
1+190.10  2.29  4.59  3.59  16.47  1,297,441.57 
1+200.00  2.29  4.59  4.95  22.71  1,297,418.86 
1+202.92  2.29  4.59  1.46  6.70  1,297,412.16 
1+210.10  2.29  4.59  3.59  16.47  1,297,395.69 
1+220.00  2.29  4.59  4.95  22.71  1,297,372.98 
1+222.92  2.29  4.59  1.46  6.70  1,297,366.28 
1+230.10  2.29  4.59  3.59  16.47  1,297,349.81 
1+240.00  2.29  4.59  4.95  22.71  1,297,327.10 
1+242.92  2.29  4.59  1.46  6.70  1,297,320.40 
1+250.10  2.29  4.59  3.59  16.47  1,297,303.93 
1+260.00  2.29  4.59  4.95  22.71  1,297,281.22 
1+262.92  2.29  4.59  1.46  6.70  1,297,274.52 
1+270.10  2.29  4.59  3.59  16.47  1,297,258.05 
1+280.00  2.29  4.59  4.95  22.71  1,297,235.34 
1+282.92  2.29  4.59  1.46  6.70  1,297,228.64 
1+290.10  2.29  4.59  3.59  16.47  1,297,212.17 
1+300.00  2.29  4.59  4.95  22.71  1,297,189.46 
1+302.92  2.29  4.59  1.46  6.70  1,297,182.76 

622 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.17   

1+310.10  2.29  4.59  3.59  16.47  1,297,166.29 


1+320.00  2.29  4.59  4.95  22.71  1,297,143.58 
1+322.92  2.29  4.59  1.46  6.70  1,297,136.88 
1+330.10  2.29  4.59  3.59  16.47  1,297,120.41 
1+339.72  2.29  4.59  4.81  22.06  1,297,098.35 
1+340.00  2.29  4.59  0.14  0.65  1,297,097.70 
1+345.10  2.29  4.59  2.55  11.70  1,297,086.00 
1+348.31  2.29  4.59  1.60  7.35  1,297,078.64 
1+350.10  2.29  4.59  0.90  4.12  1,297,074.53 
1+360.00  2.29  4.59  4.95  22.71  1,297,051.82 
1+362.92  2.29  4.59  1.46  6.70  1,297,045.12 
1+370.10  2.29  4.59  3.59  16.47  1,297,028.65 
1+380.00  2.29  4.59  4.95  22.71  1,297,005.94 
1+382.92  2.29  4.59  1.46  6.70  1,296,999.24 
1+390.10  2.29  4.59  3.59  16.47  1,296,982.77 
1+400.00  2.29  4.59  4.95  22.71  1,296,960.06 
1+402.92  2.29  4.59  1.46  6.70  1,296,953.36 
1+410.10  2.29  4.59  3.59  16.47  1,296,936.89 
1+420.00  2.29  4.59  4.95  22.71  1,296,914.18 
1+422.92  2.29  4.59  1.46  6.70  1,296,907.48 
1+430.10  2.29  4.59  3.59  16.47  1,296,891.01 
1+440.00  2.29  4.59  4.95  22.71  1,296,868.30 
1+442.92  2.29  4.59  1.46  6.70  1,296,861.60 
1+450.10  2.29  4.59  3.59  16.47  1,296,845.13 
1+460.00  2.29  4.59  4.95  22.71  1,296,822.42 
1+462.92  2.29  4.59  1.46  6.70  1,296,815.72 
1+470.10  2.29  4.59  3.59  16.47  1,296,799.25 
1+480.00  2.29  4.59  4.95  22.71  1,296,776.54 
1+482.92  2.29  4.59  1.46  6.70  1,296,769.84 
1+490.10  2.29  4.59  3.59  16.47  1,296,753.37 
1+500.00  2.29  4.59  4.95  22.71  1,296,730.66 
1+502.92  2.29  4.59  1.46  6.70  1,296,723.96 
1+510.10  2.29  4.59  3.59  16.47  1,296,707.49 
1+520.00  2.29  4.59  4.95  22.71  1,296,684.78 
1+522.92  2.29  4.59  1.46  6.70  1,296,678.08 
1+530.10  2.29  4.59  3.59  16.47  1,296,661.61 
1+540.00  2.29  4.59  4.95  22.71  1,296,638.90 
1+542.92  2.29  4.59  1.46  6.70  1,296,632.20 
1+550.10  2.29  4.59  3.59  16.47  1,296,615.73 
1+560.00  2.29  4.59  4.95  22.71  1,296,593.02 
1+562.92  2.29  4.59  1.46  6.70  1,296,586.32 
1+570.10  2.29  4.59  3.59  16.47  1,296,569.85 
1+580.00  2.29  4.59  4.95  22.71  1,296,547.14 
1+582.92  2.29  4.59  1.46  6.70  1,296,540.44 
1+590.10  2.29  4.59  3.59  16.47  1,296,523.97 

623 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.17   

1+600.00  2.29  4.59  4.95  22.71  1,296,501.26 


1+602.92  2.29  4.59  1.46  6.70  1,296,494.56 
1+610.10  2.29  4.59  3.59  16.47  1,296,478.09 
1+620.00  2.29  4.59  4.95  22.71  1,296,455.38 
1+622.92  2.29  4.59  1.46  6.70  1,296,448.68 
1+630.10  2.29  4.59  3.59  16.47  1,296,432.21 
1+640.00  2.29  4.59  4.95  22.71  1,296,409.50 
1+642.92  2.29  4.59  1.46  6.70  1,296,402.80 
1+650.10  2.29  4.59  3.59  16.47  1,296,386.33 
1+656.51  2.29  4.59  3.21  14.71  1,296,371.62 
1+660.00  2.29  4.59  1.74  8.00  1,296,363.62 
1+660.09  2.29  4.59  0.04  0.19  1,296,363.42 
1+660.10  2.29  4.59  0.01  0.03  1,296,363.39 
1+666.54  2.29  4.59  3.22  14.76  1,296,348.63 
1+670.10  2.29  4.58  1.78  8.16  1,296,340.47 
1+676.65  2.28  4.57  3.27  14.95  1,296,325.52 
1+680.00  2.27  4.55  1.68  7.62  1,296,317.91 
1+680.10  2.27  4.54  0.05  0.23  1,296,317.68 
1+686.85  2.25  4.52  3.37  15.24  1,296,302.43 
1+690.10  2.23  4.48  1.63  7.29  1,296,295.15 
1+697.15  2.19  4.42  3.52  15.58  1,296,279.56 
1+700.00  2.16  4.35  1.42  6.19  1,296,273.37 
1+700.11  2.16  4.33  0.05  0.23  1,296,273.14 
1+707.59  2.07  4.23  3.74  15.84  1,296,257.30 
1+710.11  2.03  4.10  1.26  5.19  1,296,252.12 
1+718.20  1.87  3.90  4.04  15.75  1,296,236.36 
1+720.00  1.82  3.69  0.90  3.32  1,296,233.04 
1+720.00  1.82  3.64  0.00  0.00  1,296,233.04 
1+720.13  1.82  3.64  0.06  0.23  1,296,232.81 
1+728.99  1.57  3.38  4.43  14.99  1,296,217.82 
1+730.14  1.53  3.10  0.57  1.78  1,296,216.04 
1+739.94  1.27  2.80  4.90  13.71  1,296,202.33 
1+740.00  1.26  2.53  0.03  0.08  1,296,202.25 
1+740.15  1.26  2.52  0.08  0.19  1,296,202.06 
1+742.20  1.20  2.46  1.02  2.52  1,296,199.54 
1+750.16  0.99  2.19  3.98  8.74  1,296,190.80 
1+756.15  0.84  1.83  3.00  5.47  1,296,185.33 
1+760.00  0.74  1.57  1.92  3.02  1,296,182.31 
1+760.18  0.73  1.47  0.09  0.13  1,296,182.18 
1+760.25  0.73  1.46  0.04  0.06  1,296,182.13 
1+764.30  0.63  1.36  2.02  2.75  1,296,179.37 
1+770.19  0.50  1.13  2.94  3.32  1,296,176.05 
1+778.67  0.34  0.84  4.24  3.57  1,296,172.49 
1+780.00  0.32  0.66  0.67  0.44  1,296,172.04 
1+780.19  0.32  0.64  0.10  0.06  1,296,171.98 

624 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.17   

1+781.52  0.30  0.61  0.67  0.41  1,296,171.58 


1+790.20  0.18  0.47  4.34  2.04  1,296,169.53 
1+797.12  0.10  0.28  3.46  0.97  1,296,168.57 
1+800.00  0.08  0.18  1.44  0.26  1,296,168.31 
1+800.20  0.08  0.16  0.10  0.02  1,296,168.29 
1+809.55  0.02  0.10  4.67  0.46  1,296,167.83 
1+810.20  0.02  0.04  0.33  0.01  1,296,167.81 
1+819.42  0.00  0.02  4.61  0.09  1,296,167.73 
1+820.17  15.05  15.05  0.38  5.68  1,296,162.05 
 

TABLA 42 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 5043+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.45 AL 0+520.00   

0+009.45  0.02  0.02        1,300,000.00 


0+009.97  0.02  0.04  0.26  0.01  1,299,999.99 
0+018.07  0.06  0.08  4.05  0.34  1,299,999.65 
0+019.97  0.08  0.14  0.95  0.14  1,299,999.52 
0+020.00  0.08  0.16  0.01  0.00  1,299,999.52 
0+026.03  0.13  0.21  3.02  0.63  1,299,998.88 
0+029.97  0.18  0.31  1.97  0.61  1,299,998.28 
0+033.47  0.22  0.40  1.75  0.69  1,299,997.59 
0+039.98  0.32  0.54  3.26  1.75  1,299,995.84 
0+040.00  0.32  0.63  0.01  0.01  1,299,995.83 
0+040.47  0.32  0.64  0.23  0.15  1,299,995.68 
0+041.49  0.34  0.67  0.51  0.34  1,299,995.35 
0+046.70  0.44  0.78  2.61  2.02  1,299,993.32 
0+049.99  0.50  0.94  1.64  1.54  1,299,991.79 
0+052.55  0.56  1.06  1.28  1.35  1,299,990.43 
0+055.85  0.63  1.19  1.65  1.96  1,299,988.48 
0+057.75  0.68  1.31  0.95  1.24  1,299,987.24 
0+059.92  0.73  1.40  1.08  1.52  1,299,985.72 
0+060.00  0.73  1.46  0.04  0.06  1,299,985.66 
0+060.00  0.73  1.46  0.00  0.00  1,299,985.66 
0+062.22  0.79  1.52  1.11  1.69  1,299,983.97 
0+064.00  0.84  1.62  0.89  1.45  1,299,982.52 
0+067.50  0.93  1.76  1.75  3.08  1,299,979.44 
0+070.01  0.99  1.92  1.25  2.40  1,299,977.04 
0+073.33  1.08  2.07  1.66  3.44  1,299,973.60 
0+077.96  1.20  2.28  2.32  5.28  1,299,968.32 
0+079.81  1.25  2.46  0.92  2.26  1,299,966.05 

625 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.45 AL 0+520.00   

0+080.00  1.26  2.51  0.10  0.24  1,299,965.81 


0+080.02  1.26  2.52  0.01  0.03  1,299,965.78 
0+088.89  1.50  2.76  4.43  12.24  1,299,953.54 
0+090.03  1.54  3.04  0.57  1.75  1,299,951.80 
0+098.13  1.76  3.30  4.05  13.35  1,299,938.45 
0+100.00  1.82  3.58  0.94  3.35  1,299,935.10 
0+100.05  1.82  3.63  0.02  0.08  1,299,935.02 
0+100.17  1.82  3.64  0.06  0.22  1,299,934.79 
0+107.53  1.99  3.81  3.68  14.01  1,299,920.78 
0+110.06  2.03  4.02  1.26  5.08  1,299,915.70 
0+117.11  2.13  4.16  3.53  14.68  1,299,901.02 
0+120.00  2.16  4.29  1.45  6.21  1,299,894.82 
0+120.06  2.16  4.32  0.03  0.14  1,299,894.68 
0+126.81  2.22  4.38  3.38  14.77  1,299,879.91 
0+130.07  2.23  4.45  1.63  7.24  1,299,872.67 
0+136.62  2.26  4.49  3.27  14.72  1,299,857.95 
0+140.00  2.27  4.53  1.69  7.66  1,299,850.29 
0+140.07  2.27  4.54  0.03  0.16  1,299,850.13 
0+146.51  2.28  4.55  3.22  14.65  1,299,835.49 
0+150.07  2.29  4.57  1.78  8.15  1,299,827.34 
0+156.47  2.29  4.58  3.20  14.66  1,299,812.68 
0+160.00  2.29  4.59  1.77  8.10  1,299,804.58 
0+160.07  2.29  4.59  0.04  0.16  1,299,804.42 
0+160.09  2.29  4.59  0.01  0.03  1,299,804.38 
0+166.48  2.29  4.59  3.20  14.67  1,299,789.71 
0+170.07  2.29  4.59  1.80  8.24  1,299,781.48 
0+176.48  2.29  4.59  3.21  14.70  1,299,766.77 
0+180.00  2.29  4.59  1.76  8.07  1,299,758.70 
0+180.07  2.29  4.59  0.04  0.16  1,299,758.54 
0+192.89  2.29  4.59  6.41  29.41  1,299,729.13 
0+200.00  2.29  4.59  3.55  16.31  1,299,712.82 
0+200.07  2.29  4.59  0.04  0.16  1,299,712.66 
0+212.89  2.29  4.59  6.41  29.41  1,299,683.25 
0+220.00  2.29  4.59  3.55  16.31  1,299,666.94 
0+220.07  2.29  4.59  0.04  0.16  1,299,666.78 
0+232.89  2.29  4.59  6.41  29.41  1,299,637.37 
0+240.00  2.29  4.59  3.55  16.31  1,299,621.06 
0+240.07  2.29  4.59  0.04  0.16  1,299,620.90 
0+252.89  2.29  4.59  6.41  29.41  1,299,591.49 
0+260.00  2.30  4.59  3.55  16.31  1,299,575.18 
0+260.07  2.30  4.59  0.04  0.16  1,299,575.01 
0+272.89  2.29  4.59  6.41  29.42  1,299,545.60 
0+280.00  2.29  4.59  3.55  16.31  1,299,529.29 
0+280.07  2.29  4.59  0.04  0.16  1,299,529.13 
0+292.89  2.29  4.59  6.41  29.41  1,299,499.72 

626 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.45 AL 0+520.00   

0+300.00  2.29  4.59  3.55  16.31  1,299,483.41 


0+300.07  2.29  4.59  0.04  0.16  1,299,483.25 
0+312.89  2.29  4.59  6.41  29.41  1,299,453.84 
0+320.00  2.29  4.59  3.55  16.31  1,299,437.53 
0+320.07  2.29  4.59  0.04  0.16  1,299,437.37 
0+332.89  2.29  4.59  6.41  29.41  1,299,407.96 
0+340.00  2.29  4.59  3.55  16.31  1,299,391.65 
0+340.07  2.29  4.59  0.04  0.16  1,299,391.49 
0+352.89  2.29  4.59  6.41  29.41  1,299,362.08 
0+360.00  2.29  4.59  3.55  16.31  1,299,345.77 
0+360.07  2.29  4.59  0.04  0.16  1,299,345.61 
0+372.89  2.29  4.59  6.41  29.41  1,299,316.20 
0+380.00  2.29  4.59  3.55  16.31  1,299,299.89 
0+380.07  2.29  4.59  0.04  0.16  1,299,299.73 
0+381.98  2.29  4.59  0.95  4.37  1,299,295.36 
0+383.04  2.29  4.59  0.53  2.45  1,299,292.91 
0+383.14  2.29  4.59  0.05  0.23  1,299,292.69 
0+393.94  2.29  4.59  5.40  24.77  1,299,267.91 
0+400.00  2.30  4.59  3.03  13.91  1,299,254.01 
0+400.07  2.30  4.59  0.03  0.16  1,299,253.85 
0+412.85  2.29  4.59  6.39  29.31  1,299,224.54 
0+420.00  2.29  4.59  3.58  16.41  1,299,208.13 
0+420.06  2.29  4.59  0.03  0.13  1,299,208.00 
0+432.82  2.29  4.59  6.38  29.26  1,299,178.74 
0+440.00  2.29  4.59  3.59  16.48  1,299,162.26 
0+440.04  2.29  4.59  0.02  0.09  1,299,162.17 
0+452.78  2.29  4.59  6.37  29.20  1,299,132.97 
0+460.00  2.29  4.59  3.61  16.57  1,299,116.40 
0+460.02  2.29  4.59  0.01  0.03  1,299,116.37 
0+472.73  2.29  4.59  6.36  29.14  1,299,087.22 
0+479.98  2.29  4.58  3.63  16.63  1,299,070.60 
0+480.00  2.29  4.59  0.01  0.04  1,299,070.55 
0+492.67  2.29  4.58  6.34  29.04  1,299,041.52 
0+499.94  2.29  4.58  3.63  16.66  1,299,024.86 
0+500.00  2.29  4.59  0.03  0.14  1,299,024.72 
0+512.61  2.29  4.58  6.30  28.89  1,298,995.84 
0+519.89  2.29  4.58  3.64  16.69  1,298,979.15 
0+520.00  16.96  19.25  0.05  1.04  1,298,978.11 
 

627 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TABLA 43 CÁLCULO DE ACARREOS DE BALASTO DE ESTACIÓN MAXCANU VÍA DERECHA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+007.69 AL 0+480.00   

0+007.69  0.03  0.03        1,300,000.00 


0+008.48  0.04  0.07  0.39  0.03  1,299,999.97 
0+012.45  0.08  0.12  1.99  0.24  1,299,999.73 
0+013.48  0.10  0.18  0.52  0.09  1,299,999.64 
0+016.64  0.15  0.24  1.58  0.39  1,299,999.26 
0+018.48  0.18  0.33  0.92  0.30  1,299,998.95 
0+020.00  0.21  0.40  0.76  0.30  1,299,998.65 
0+022.03  0.26  0.47  1.02  0.48  1,299,998.17 
0+027.44  0.40  0.66  2.71  1.79  1,299,996.38 
0+027.99  0.42  0.83  0.27  0.23  1,299,996.15 
0+028.49  0.44  0.86  0.25  0.21  1,299,995.94 
0+031.53  0.54  0.97  1.52  1.48  1,299,994.46 
0+033.50  0.61  1.14  0.99  1.13  1,299,993.34 
0+034.77  0.65  1.26  0.64  0.80  1,299,992.54 
0+034.99  0.66  1.32  0.11  0.14  1,299,992.39 
0+037.00  0.74  1.40  1.01  1.41  1,299,990.98 
0+037.83  0.77  1.51  0.41  0.62  1,299,990.36 
0+038.51  0.80  1.57  0.34  0.54  1,299,989.82 
0+040.00  0.86  1.66  0.75  1.24  1,299,988.58 
0+041.32  0.91  1.77  0.66  1.17  1,299,987.41 
0+043.01  0.98  1.89  0.84  1.59  1,299,985.82 
0+046.08  1.10  2.08  1.53  3.18  1,299,982.64 
0+048.53  1.20  2.29  1.23  2.81  1,299,979.83 
0+050.54  1.28  2.47  1.00  2.48  1,299,977.35 
0+053.54  1.40  2.68  1.50  4.02  1,299,973.33 
0+054.12  1.42  2.82  0.29  0.81  1,299,972.51 
0+055.57  1.48  2.90  0.72  2.10  1,299,970.41 
0+058.35  1.59  3.07  1.39  4.28  1,299,966.14 
0+058.55  1.60  3.20  0.10  0.33  1,299,965.81 
0+060.00  1.66  3.26  0.72  2.36  1,299,963.45 
0+067.00  1.95  3.61  3.50  12.65  1,299,950.80 
0+068.58  2.02  3.97  0.79  3.12  1,299,947.68 
0+072.56  2.17  4.19  1.99  8.34  1,299,939.33 
0+073.59  2.21  4.38  0.51  2.25  1,299,937.08 
0+075.07  2.26  4.47  0.74  3.31  1,299,933.77 
0+077.36  2.33  4.59  1.14  5.25  1,299,928.52 
0+078.60  2.36  4.69  0.62  2.91  1,299,925.62 
0+080.00  2.39  4.75  0.70  3.33  1,299,922.28 
0+085.54  2.50  4.89  2.77  13.55  1,299,908.74 
0+088.61  2.53  5.03  1.53  7.71  1,299,901.02 
0+092.00  2.56  5.10  1.69  8.64  1,299,892.39 
0+093.61  2.58  5.14  0.81  4.15  1,299,888.24 
0+096.93  2.59  5.17  1.66  8.57  1,299,879.67 

628 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+007.69 AL 0+480.00   

0+098.62  2.60  5.19  0.84  4.37  1,299,875.29 


0+100.00  2.61  5.21  0.69  3.60  1,299,871.69 
0+105.12  2.62  5.22  2.56  13.37  1,299,858.31 
0+108.62  2.62  5.23  1.75  9.14  1,299,849.18 
0+110.06  2.62  5.24  0.72  3.77  1,299,845.41 
0+111.88  2.62  5.24  0.91  4.78  1,299,840.62 
0+113.62  2.62  5.24  0.87  4.54  1,299,836.09 
0+116.88  2.62  5.24  1.63  8.56  1,299,827.53 
0+118.62  2.62  5.24  0.87  4.53  1,299,823.00 
0+120.00  2.62  5.24  0.69  3.62  1,299,819.37 
0+125.15  2.62  5.24  2.58  13.49  1,299,805.89 
0+128.62  2.62  5.24  1.73  9.07  1,299,796.82 
0+131.88  2.62  5.24  1.63  8.56  1,299,788.26 
0+133.62  2.62  5.24  0.87  4.53  1,299,783.73 
0+140.00  2.62  5.24  3.19  16.71  1,299,767.01 
0+146.69  2.62  5.24  3.34  17.51  1,299,749.51 
0+153.62  2.62  5.24  3.46  18.14  1,299,731.37 
0+160.00  2.62  5.24  3.19  16.71  1,299,714.65 
0+166.69  2.62  5.24  3.34  17.51  1,299,697.15 
0+173.62  2.62  5.24  3.46  18.14  1,299,679.01 
0+180.00  2.62  5.24  3.19  16.71  1,299,662.29 
0+186.69  2.62  5.24  3.34  17.51  1,299,644.79 
0+193.62  2.62  5.24  3.46  18.14  1,299,626.65 
0+200.00  2.62  5.24  3.19  16.71  1,299,609.93 
0+206.69  2.62  5.24  3.34  17.51  1,299,592.43 
0+213.62  2.62  5.24  3.46  18.14  1,299,574.29 
0+220.00  2.62  5.24  3.19  16.71  1,299,557.57 
0+226.69  2.62  5.24  3.34  17.51  1,299,540.07 
0+233.62  2.62  5.24  3.46  18.14  1,299,521.93 
0+240.00  2.62  5.24  3.19  16.71  1,299,505.21 
0+246.69  2.62  5.24  3.34  17.51  1,299,487.71 
0+253.62  2.62  5.24  3.46  18.14  1,299,469.57 
0+260.00  2.62  5.24  3.19  16.71  1,299,452.85 
0+266.69  2.62  5.24  3.34  17.51  1,299,435.35 
0+273.62  2.62  5.24  3.46  18.14  1,299,417.21 
0+280.00  2.62  5.24  3.19  16.71  1,299,400.49 
0+286.69  2.62  5.24  3.34  17.51  1,299,382.99 
0+293.62  2.62  5.24  3.46  18.14  1,299,364.85 
0+300.00  2.62  5.24  3.19  16.71  1,299,348.13 
0+306.69  2.62  5.24  3.34  17.51  1,299,330.63 
0+313.62  2.62  5.24  3.46  18.14  1,299,312.49 
0+320.00  2.62  5.24  3.19  16.71  1,299,295.77 
0+326.69  2.62  5.24  3.34  17.51  1,299,278.27 
0+333.62  2.62  5.24  3.46  18.14  1,299,260.13 
0+340.00  2.62  5.24  3.19  16.71  1,299,243.41 

629 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+007.69 AL 0+480.00   

0+346.69  2.62  5.24  3.34  17.51  1,299,225.91 


0+353.62  2.62  5.24  3.46  18.14  1,299,207.77 
0+360.00  2.62  5.24  3.19  16.71  1,299,191.05 
0+366.69  2.62  5.24  3.34  17.51  1,299,173.55 
0+370.06  2.62  5.24  1.68  8.82  1,299,164.73 
0+373.62  2.62  5.23  1.78  9.31  1,299,155.41 
0+380.00  2.61  5.22  3.19  16.67  1,299,138.75 
0+387.51  2.57  5.17  3.75  19.42  1,299,119.33 
0+393.62  2.51  5.08  3.06  15.52  1,299,103.81 
0+400.00  2.40  4.90  3.19  15.63  1,299,088.18 
0+405.05  2.26  4.66  2.52  11.74  1,299,076.43 
0+411.15  2.03  4.29  3.05  13.09  1,299,063.34 
0+413.66  1.93  3.96  1.26  4.98  1,299,058.36 
0+420.00  1.67  3.60  3.17  11.39  1,299,046.96 
0+424.55  1.48  3.15  2.27  7.15  1,299,039.81 
0+433.71  1.11  2.59  4.58  11.87  1,299,027.94 
0+437.10  0.98  2.09  1.70  3.55  1,299,024.40 
0+440.00  0.86  1.84  1.45  2.67  1,299,021.73 
0+442.18  0.78  1.64  1.09  1.79  1,299,019.94 
0+443.11  0.74  1.52  0.46  0.70  1,299,019.24 
0+443.73  0.72  1.46  0.31  0.45  1,299,018.79 
0+445.13  0.66  1.38  0.70  0.97  1,299,017.82 
0+452.67  0.40  1.07  3.77  4.02  1,299,013.80 
0+453.75  0.37  0.78  0.54  0.42  1,299,013.39 
0+456.08  0.31  0.68  1.17  0.80  1,299,012.59 
0+460.00  0.22  0.53  1.96  1.03  1,299,011.56 
0+463.75  0.14  0.36  1.88  0.67  1,299,010.89 
0+473.10  0.03  0.17  4.67  0.79  1,299,010.10 
0+473.76  0.02  0.05  0.33  0.02  1,299,010.09 
0+480.00  0.00  0.02  3.12  0.07  1,299,010.02 
 

TABLA 44 CÁLCULO DE ACARREOS DE BALASTO DE ESTACIÓN MAXCANU VÍA IZQUIERDA 

Áreas a1+a2 Semi- Volumen Ordenada


Cadenamiento
Balasto distancia Balasto curva masa

TRAMO DEL KM. 0+008.22 AL 0+630.28

0+008.22 0.04 0.04 1,300,000.00


0+010.00 0.05 0.09 0.89 0.08 1,299,999.92
0+019.71 0.21 0.26 4.85 1.26 1,299,998.66
0+020.00 0.21 0.42 0.15 0.06 1,299,998.60
0+027.46 0.40 0.62 3.73 2.30 1,299,996.30
0+028.36 0.43 0.84 0.45 0.38 1,299,995.92

630 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas a1+a2 Semi- Volumen Ordenada


Cadenamiento
Balasto distancia Balasto curva masa

TRAMO DEL KM. 0+008.22 AL 0+630.28

0+030.02 0.48 0.92 0.83 0.76 1,299,995.16


0+034.89 0.66 1.14 2.44 2.78 1,299,992.38
0+034.99 0.66 1.32 0.05 0.07 1,299,992.31
0+037.01 0.74 1.40 1.01 1.42 1,299,990.89
0+040.00 0.86 1.60 1.49 2.39 1,299,988.50
0+040.02 0.86 1.72 0.01 0.02 1,299,988.49
0+043.02 0.98 1.84 1.50 2.75 1,299,985.73
0+045.73 1.08 2.06 1.36 2.79 1,299,982.94
0+050.06 1.26 2.34 2.16 5.07 1,299,977.87
0+053.07 1.38 2.64 1.50 3.96 1,299,973.91
0+055.58 1.48 2.86 1.26 3.59 1,299,970.33
0+060.00 1.66 3.14 2.21 6.95 1,299,963.38
0+063.92 1.82 3.48 1.96 6.83 1,299,956.55
0+065.09 1.87 3.70 0.59 2.17 1,299,954.38
0+069.45 2.05 3.93 2.18 8.56 1,299,945.82
0+070.10 2.08 4.13 0.33 1.34 1,299,944.48
0+074.24 2.23 4.31 2.07 8.91 1,299,935.57
0+075.07 2.26 4.49 0.41 1.86 1,299,933.70
0+075.12 2.26 4.52 0.02 0.10 1,299,933.60
0+080.00 2.39 4.65 2.44 11.36 1,299,922.24
0+082.67 2.45 4.84 1.33 6.46 1,299,915.78
0+085.13 2.49 4.94 1.23 6.08 1,299,909.70
0+088.71 2.53 5.02 1.79 8.98 1,299,900.72
0+090.14 2.55 5.08 0.71 3.63 1,299,897.09
0+093.59 2.58 5.12 1.73 8.84 1,299,888.25
0+095.14 2.58 5.16 0.78 4.00 1,299,884.25
0+100.00 2.60 5.19 2.43 12.61 1,299,871.64
0+101.77 2.61 5.21 0.88 4.61 1,299,867.03
0+105.14 2.62 5.22 1.69 8.81 1,299,858.22
0+108.41 2.62 5.23 1.64 8.56 1,299,849.66
0+110.06 2.62 5.24 0.82 4.31 1,299,845.35
0+110.14 2.62 5.24 0.04 0.22 1,299,845.13
0+113.41 2.62 5.24 1.63 8.56 1,299,836.58
0+115.14 2.62 5.24 0.87 4.53 1,299,832.04
0+120.00 2.62 5.24 2.43 12.72 1,299,819.32
0+121.68 2.62 5.24 0.84 4.39 1,299,814.93
0+125.14 2.62 5.24 1.73 9.07 1,299,805.86
0+128.41 2.62 5.24 1.63 8.56 1,299,797.31
0+130.14 2.62 5.24 0.87 4.53 1,299,792.77
0+133.41 2.62 5.24 1.63 8.56 1,299,784.22
0+135.14 2.62 5.24 0.87 4.53 1,299,779.68
0+140.00 2.62 5.24 2.43 12.72 1,299,766.96
0+141.68 2.62 5.24 0.84 4.39 1,299,762.57
0+145.14 2.62 5.24 1.73 9.07 1,299,753.50
0+148.41 2.62 5.24 1.63 8.56 1,299,744.95

631 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas a1+a2 Semi- Volumen Ordenada


Cadenamiento
Balasto distancia Balasto curva masa

TRAMO DEL KM. 0+008.22 AL 0+630.28

0+150.14 2.62 5.24 0.87 4.53 1,299,740.41


0+153.41 2.62 5.24 1.63 8.56 1,299,731.86
0+155.14 2.62 5.24 0.87 4.53 1,299,727.32
0+160.00 2.62 5.24 2.43 12.72 1,299,714.60
0+161.68 2.62 5.24 0.84 4.39 1,299,710.21
0+165.14 2.62 5.24 1.73 9.07 1,299,701.14
0+168.41 2.62 5.24 1.63 8.56 1,299,692.59
0+170.14 2.62 5.24 0.87 4.53 1,299,688.05
0+173.41 2.62 5.24 1.63 8.56 1,299,679.50
0+175.14 2.62 5.24 0.87 4.53 1,299,674.96
0+180.00 2.62 5.24 2.43 12.72 1,299,662.24
0+181.68 2.62 5.24 0.84 4.39 1,299,657.85
0+185.14 2.62 5.24 1.73 9.07 1,299,648.78
0+188.41 2.62 5.24 1.63 8.56 1,299,640.23
0+190.14 2.62 5.24 0.87 4.53 1,299,635.69
0+193.41 2.62 5.24 1.63 8.56 1,299,627.14
0+195.14 2.62 5.24 0.87 4.53 1,299,622.60
0+200.00 2.62 5.24 2.43 12.72 1,299,609.88
0+201.68 2.62 5.24 0.84 4.39 1,299,605.49
0+205.14 2.62 5.24 1.73 9.07 1,299,596.42
0+208.41 2.62 5.24 1.63 8.56 1,299,587.87
0+210.14 2.62 5.24 0.87 4.53 1,299,583.33
0+220.00 2.62 5.24 4.93 25.81 1,299,557.52
0+223.21 2.62 5.24 1.61 8.41 1,299,549.11
0+230.14 2.62 5.24 3.46 18.13 1,299,530.97
0+240.00 2.62 5.24 4.93 25.81 1,299,505.16
0+243.21 2.62 5.24 1.61 8.41 1,299,496.75
0+250.14 2.62 5.24 3.46 18.13 1,299,478.61
0+260.00 2.62 5.24 4.93 25.81 1,299,452.80
0+263.21 2.62 5.24 1.61 8.41 1,299,444.39
0+270.14 2.62 5.24 3.46 18.13 1,299,426.25
0+280.00 2.62 5.24 4.93 25.81 1,299,400.44
0+283.21 2.62 5.24 1.61 8.41 1,299,392.03
0+290.14 2.62 5.24 3.46 18.13 1,299,373.89
0+300.00 2.62 5.24 4.93 25.81 1,299,348.08
0+303.21 2.62 5.24 1.61 8.41 1,299,339.67
0+310.14 2.62 5.24 3.46 18.13 1,299,321.53
0+320.00 2.62 5.24 4.93 25.81 1,299,295.72
0+323.21 2.62 5.24 1.61 8.41 1,299,287.31
0+330.14 2.62 5.24 3.46 18.13 1,299,269.17
0+340.00 2.62 5.24 4.93 25.81 1,299,243.36
0+343.21 2.62 5.24 1.61 8.41 1,299,234.95
0+350.14 2.62 5.24 3.46 18.13 1,299,216.81
0+360.00 2.62 5.24 4.93 25.81 1,299,191.00
0+363.21 2.62 5.24 1.61 8.41 1,299,182.59

632 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas a1+a2 Semi- Volumen Ordenada


Cadenamiento
Balasto distancia Balasto curva masa

TRAMO DEL KM. 0+008.22 AL 0+630.28

0+370.14 2.62 5.24 3.46 18.13 1,299,164.45


0+380.00 2.62 5.24 4.93 25.81 1,299,138.64
0+383.21 2.62 5.24 1.61 8.41 1,299,130.23
0+390.14 2.62 5.24 3.46 18.13 1,299,112.09
0+400.00 2.62 5.24 4.93 25.81 1,299,086.28
0+403.21 2.62 5.24 1.61 8.41 1,299,077.87
0+410.14 2.62 5.24 3.46 18.13 1,299,059.73
0+420.00 2.62 5.24 4.93 25.81 1,299,033.92
0+423.21 2.62 5.24 1.61 8.41 1,299,025.51
0+430.14 2.62 5.24 3.46 18.13 1,299,007.37
0+440.00 2.62 5.24 4.93 25.81 1,298,981.56
0+443.21 2.62 5.24 1.61 8.41 1,298,973.15
0+450.14 2.62 5.24 3.46 18.13 1,298,955.01
0+460.00 2.62 5.24 4.93 25.81 1,298,929.20
0+463.21 2.62 5.24 1.61 8.41 1,298,920.79
0+470.14 2.62 5.24 3.46 18.13 1,298,902.65
0+480.00 2.62 5.24 4.93 25.81 1,298,876.84
0+483.21 2.62 5.24 1.61 8.41 1,298,868.43
0+490.14 2.62 5.24 3.46 18.13 1,298,850.29
0+500.00 2.62 5.24 4.93 25.81 1,298,824.48
0+503.21 2.62 5.24 1.61 8.41 1,298,816.07
0+510.14 2.62 5.24 3.46 18.13 1,298,797.93
0+516.68 2.62 5.24 3.27 17.11 1,298,780.82
0+520.00 2.62 5.24 1.66 8.70 1,298,772.12
0+520.14 2.62 5.24 0.07 0.37 1,298,771.75
0+523.11 2.62 5.24 1.48 7.76 1,298,763.99
0+526.70 2.62 5.23 1.79 9.39 1,298,754.60
0+530.14 2.61 5.23 1.72 9.01 1,298,745.59
0+536.91 2.59 5.20 3.39 17.61 1,298,727.98
0+540.00 2.57 5.16 1.54 7.97 1,298,720.01
0+540.14 2.57 5.14 0.07 0.37 1,298,719.64
0+547.37 2.50 5.07 3.61 18.30 1,298,701.34
0+550.15 2.45 4.95 1.39 6.90 1,298,694.43
0+558.10 2.26 4.71 3.97 18.72 1,298,675.72
0+558.15 2.26 4.52 0.03 0.12 1,298,675.60
0+560.00 2.19 4.45 0.93 4.12 1,298,671.48
0+560.17 2.19 4.38 0.09 0.37 1,298,671.10
0+569.23 1.82 4.01 4.53 18.18 1,298,652.92
0+570.19 1.78 3.61 0.48 1.73 1,298,651.19
0+577.59 1.48 3.26 3.70 12.08 1,298,639.12
0+580.00 1.38 2.86 1.20 3.45 1,298,635.67
0+580.22 1.37 2.76 0.11 0.30 1,298,635.37
0+590.15 0.98 2.35 4.97 11.68 1,298,623.70
0+590.24 0.97 1.95 0.04 0.09 1,298,623.61
0+596.16 0.74 1.71 2.96 5.07 1,298,618.54

633 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas a1+a2 Semi- Volumen Ordenada


Cadenamiento
Balasto distancia Balasto curva masa

TRAMO DEL KM. 0+008.22 AL 0+630.28

0+598.18 0.66 1.40 1.01 1.42 1,298,617.12


0+600.00 0.59 1.26 0.91 1.14 1,298,615.98
0+600.26 0.58 1.18 0.13 0.15 1,298,615.82
0+605.71 0.40 0.99 2.73 2.69 1,298,613.13
0+610.27 0.28 0.68 2.28 1.56 1,298,611.57
0+616.67 0.15 0.43 3.20 1.36 1,298,610.21
0+620.00 0.09 0.24 1.67 0.39 1,298,609.82
0+620.28 0.09 0.18 0.14 0.03 1,298,609.79
0+630.16 0.01 0.09 4.94 0.46 1,298,609.33
0+630.28 0.00 0.01 0.06 0.00 1,298,609.33
 

TABLA 45 CÁLCULO DE ACARREOS DE BALASTO DE CULATÓN DERECHO 

Areas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 0+324.92   

0+000.00  2.62  2.62        1,300,000.00 


0+003.56  2.62  5.24  1.78  9.32  1,299,990.68 
0+016.63  2.62  5.24  6.54  34.22  1,299,956.46 
0+020.00  2.62  5.24  1.68  8.82  1,299,947.64 
0+023.56  2.62  5.24  1.78  9.32  1,299,938.32 
0+036.63  2.62  5.24  6.54  34.22  1,299,904.10 
0+040.00  2.62  5.24  1.68  8.82  1,299,895.28 
0+043.56  2.62  5.24  1.78  9.32  1,299,885.96 
0+056.63  2.62  5.24  6.54  34.22  1,299,851.74 
0+060.00  2.62  5.24  1.68  8.82  1,299,842.92 
0+063.56  2.62  5.24  1.78  9.32  1,299,833.60 
0+070.10  2.62  5.24  3.27  17.11  1,299,816.49 
0+073.56  2.62  5.24  1.73  9.07  1,299,807.42 
0+080.00  2.62  5.24  3.22  16.86  1,299,790.56 
0+080.10  2.62  5.24  0.05  0.25  1,299,790.31 
0+083.56  2.62  5.24  1.73  9.07  1,299,781.24 
0+090.10  2.62  5.24  3.27  17.11  1,299,764.13 
0+093.56  2.62  5.24  1.73  9.07  1,299,755.06 
0+100.00  2.62  5.24  3.22  16.86  1,299,738.20 
0+100.10  2.62  5.24  0.05  0.25  1,299,737.95 
0+103.56  2.62  5.24  1.73  9.07  1,299,728.88 
0+110.10  2.62  5.24  3.27  17.11  1,299,711.77 
0+113.56  2.62  5.24  1.73  9.07  1,299,702.70 
0+120.00  2.62  5.24  3.22  16.86  1,299,685.84 
0+120.10  2.62  5.24  0.05  0.25  1,299,685.59 
0+123.56  2.62  5.24  1.73  9.07  1,299,676.52 

634 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Areas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 0+324.92   

0+130.10  2.62  5.24  3.27  17.11  1,299,659.41 


0+133.56  2.62  5.24  1.73  9.07  1,299,650.34 
0+140.00  2.62  5.24  3.22  16.86  1,299,633.48 
0+140.10  2.62  5.24  0.05  0.25  1,299,633.23 
0+143.56  2.62  5.24  1.73  9.07  1,299,624.16 
0+150.10  2.62  5.24  3.27  17.11  1,299,607.05 
0+153.56  2.62  5.24  1.73  9.07  1,299,597.98 
0+160.00  2.62  5.24  3.22  16.86  1,299,581.12 
0+160.10  2.62  5.24  0.05  0.25  1,299,580.87 
0+163.56  2.62  5.24  1.73  9.07  1,299,571.80 
0+170.10  2.62  5.24  3.27  17.11  1,299,554.69 
0+173.56  2.62  5.24  1.73  9.07  1,299,545.62 
0+180.00  2.62  5.24  3.22  16.86  1,299,528.76 
0+180.10  2.62  5.24  0.05  0.25  1,299,528.51 
0+183.56  2.62  5.24  1.73  9.07  1,299,519.44 
0+190.10  2.62  5.24  3.27  17.11  1,299,502.33 
0+193.56  2.62  5.24  1.73  9.07  1,299,493.26 
0+200.00  2.62  5.24  3.22  16.86  1,299,476.40 
0+200.10  2.62  5.24  0.05  0.25  1,299,476.15 
0+203.56  2.62  5.24  1.73  9.07  1,299,467.08 
0+216.63  2.62  5.24  6.54  34.23  1,299,432.86 
0+220.00  2.62  5.24  1.68  8.82  1,299,424.04 
0+223.56  2.62  5.24  1.78  9.32  1,299,414.72 
0+236.63  2.62  5.24  6.54  34.23  1,299,380.50 
0+240.00  2.62  5.24  1.68  8.82  1,299,371.68 
0+243.56  2.62  5.24  1.78  9.32  1,299,362.36 
0+256.63  2.62  5.24  6.54  34.23  1,299,328.14 
0+260.00  2.62  5.24  1.68  8.82  1,299,319.32 
0+263.56  2.62  5.24  1.78  9.32  1,299,310.00 
0+276.63  2.62  5.24  6.54  34.23  1,299,275.78 
0+280.00  2.62  5.24  1.68  8.82  1,299,266.96 
0+283.56  2.62  5.24  1.78  9.32  1,299,257.64 
0+296.63  2.62  5.24  6.54  34.23  1,299,223.42 
0+300.00  2.62  5.24  1.68  8.82  1,299,214.60 
0+303.56  2.62  5.24  1.78  9.32  1,299,205.28 
0+316.63  2.62  5.24  6.54  34.23  1,299,171.05 
0+320.00  2.62  5.24  1.68  8.81  1,299,162.24 
0+323.56  2.62  5.24  1.78  9.32  1,299,152.92 
0+324.45  2.62  5.24  0.44  2.32  1,299,150.60 
0+324.92  2.62  5.24  0.23  1.23  1,299,149.37 
 

TABLA 46 CÁLCULO DE ACARREOS DE BALASTO DE CULATÓN IZQUIERDO 

Cadenamiento Áreas a1+a2 Semi- Volumen Ordenada

635 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Balasto distancia Balasto curva masa

TRAMO DEL KM. 0+000.00 AL 0+324.92

0+000.00 2.60 2.60 1,300,000.00


0+003.04 2.60 5.21 1.52 7.90 1,299,992.10
0+004.50 2.60 5.21 0.73 3.80 1,299,988.30
0+017.95 2.61 5.22 6.73 35.09 1,299,953.20
0+020.00 2.61 5.22 1.03 5.35 1,299,947.85
0+024.58 2.60 5.21 2.29 11.95 1,299,935.90
0+038.04 2.61 5.22 6.73 35.09 1,299,900.81
0+040.00 2.61 5.22 0.98 5.12 1,299,895.69
0+044.67 2.60 5.21 2.34 12.18 1,299,883.51
0+050.53 2.61 5.21 2.93 15.26 1,299,868.25
0+053.36 2.60 5.21 1.41 7.36 1,299,860.89
0+053.42 2.60 5.21 0.03 0.15 1,299,860.73
0+060.00 2.61 5.21 3.29 17.15 1,299,843.58
0+061.02 2.61 5.22 0.51 2.65 1,299,840.92
0+064.76 2.61 5.21 1.87 9.76 1,299,831.17
0+078.12 2.61 5.22 6.68 34.86 1,299,796.31
0+080.00 2.61 5.23 0.94 4.92 1,299,791.39
0+084.83 2.61 5.22 2.42 12.62 1,299,778.76
0+098.13 2.62 5.23 6.65 34.74 1,299,744.03
0+100.00 2.62 5.23 0.93 4.89 1,299,739.14
0+104.90 2.61 5.23 2.45 12.79 1,299,726.35
0+118.13 2.62 5.23 6.62 34.60 1,299,691.74
0+120.00 2.62 5.23 0.93 4.89 1,299,686.86
0+124.94 2.61 5.23 2.47 12.92 1,299,673.94
0+138.12 2.62 5.23 6.59 34.47 1,299,639.47
0+140.00 2.62 5.23 0.94 4.92 1,299,634.55
0+144.98 2.62 5.23 2.49 13.02 1,299,621.53
0+158.09 2.62 5.23 6.56 34.33 1,299,587.20
0+160.00 2.62 5.24 0.95 4.99 1,299,582.21
0+164.99 2.62 5.24 2.50 13.07 1,299,569.14
0+177.18 2.62 5.24 6.09 31.89 1,299,537.24
0+180.00 2.62 5.24 1.41 7.39 1,299,529.86
0+183.65 2.62 5.24 1.82 9.55 1,299,520.31
0+183.85 2.62 5.24 0.10 0.52 1,299,519.78
0+184.53 2.62 5.24 0.34 1.79 1,299,517.99
0+185.00 2.62 5.24 0.23 1.23 1,299,516.77
0+198.07 2.62 5.24 6.54 34.22 1,299,482.55
0+200.00 2.62 5.24 0.96 5.05 1,299,477.50
0+205.00 2.62 5.24 2.50 13.09 1,299,464.41
0+218.07 2.62 5.24 6.54 34.22 1,299,430.19
0+220.00 2.62 5.24 0.96 5.05 1,299,425.14
0+225.00 2.62 5.24 2.50 13.09 1,299,412.05
0+238.07 2.62 5.24 6.54 34.22 1,299,377.83
0+240.00 2.62 5.24 0.96 5.05 1,299,372.78
0+245.00 2.62 5.24 2.50 13.09 1,299,359.69
0+258.07 2.62 5.24 6.54 34.22 1,299,325.47

636 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

0+260.00 2.62 5.24 0.96 5.05 1,299,320.42


0+265.00 2.62 5.24 2.50 13.09 1,299,307.33
0+274.80 2.62 5.24 4.90 25.66 1,299,281.66
0+280.00 2.62 5.24 2.60 13.61 1,299,268.06
0+283.27 2.62 5.24 1.63 8.56 1,299,259.50
0+285.00 2.62 5.24 0.87 4.53 1,299,254.97
0+288.27 2.62 5.24 1.63 8.56 1,299,246.41
0+290.00 2.62 5.24 0.87 4.53 1,299,241.88
0+296.54 2.62 5.24 3.27 17.11 1,299,224.77
0+300.00 2.62 5.24 1.73 9.07 1,299,215.70
0+303.27 2.62 5.24 1.63 8.56 1,299,207.14
0+305.00 2.62 5.24 0.87 4.53 1,299,202.61
0+308.27 2.62 5.24 1.63 8.56 1,299,194.05
0+310.00 2.62 5.24 0.87 4.53 1,299,189.52
0+316.54 2.62 5.24 3.27 17.11 1,299,172.41
0+320.00 2.62 5.24 1.73 9.07 1,299,163.34
0+323.27 2.62 5.24 1.63 8.56 1,299,154.78
0+324.92 2.62 5.24 0.82 4.31 1,299,150.47
 

TABLA 47 CÁLCULO DE ACARREOS DE BALASTO DEL TRAMO 5071+500 – 6006+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5071+500.00  2.29  2.29        1,300,000.00 


5071+520.00  2.29  4.59  10.00  45.88  1,299,954.12 
5071+540.00  2.29  4.59  10.00  45.88  1,299,908.24 
5071+560.00  2.29  4.59  10.00  45.88  1,299,862.36 
5071+580.00  2.29  4.59  10.00  45.88  1,299,816.48 
5071+580.00  2.29  4.59  0.00  0.00  1,299,816.48 
5071+600.00  2.29  4.59  10.00  45.88  1,299,770.60 
5071+620.00  2.30  4.59  10.00  45.89  1,299,724.71 
5071+640.00  2.30  4.59  10.00  45.90  1,299,678.81 
5071+660.00  2.30  4.59  10.00  45.90  1,299,632.91 
5071+660.00  2.30  4.59  0.00  0.00  1,299,632.91 
5071+680.00  2.30  4.59  10.00  45.90  1,299,587.01 
5071+700.00  2.29  4.59  10.00  45.89  1,299,541.12 
5071+720.00  2.30  4.59  10.00  45.89  1,299,495.23 
5071+740.00  2.30  4.59  10.00  45.90  1,299,449.33 
5071+760.00  2.29  4.59  10.00  45.89  1,299,403.44 
5071+780.00  2.30  4.59  10.00  45.89  1,299,357.55 
5071+800.00  2.29  4.59  10.00  45.89  1,299,311.66 
5071+820.00  2.30  4.59  10.00  45.89  1,299,265.77 
5071+840.00  2.30  4.59  10.00  45.90  1,299,219.87 
5071+860.00  2.30  4.59  10.00  45.90  1,299,173.97 
5071+880.00  2.30  4.59  10.00  45.90  1,299,128.07 
5071+900.00  2.30  4.59  10.00  45.90  1,299,082.17 

637 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5071+920.00  2.30  4.59  10.00  45.90  1,299,036.27 


5071+940.00  2.30  4.59  10.00  45.90  1,298,990.37 
5071+960.00  2.29  4.59  10.00  45.89  1,298,944.48 
5071+980.00  2.29  4.59  10.00  45.88  1,298,898.60 
5072+000.00  2.30  4.59  10.00  45.89  1,298,852.71 
5072+020.00  2.30  4.59  10.00  45.90  1,298,806.81 
5072+040.00  2.30  4.59  10.00  45.90  1,298,760.91 
5072+060.00  2.30  4.59  10.00  45.90  1,298,715.01 
5072+080.00  2.30  4.59  10.00  45.90  1,298,669.11 
5072+100.00  2.30  4.59  10.00  45.90  1,298,623.21 
5072+120.00  2.29  4.59  10.00  45.89  1,298,577.32 
5072+140.00  2.30  4.59  10.00  45.89  1,298,531.43 
5072+145.35  2.30  4.59  2.67  12.27  1,298,519.16 
5072+160.00  2.30  4.60  7.33  33.68  1,298,485.48 
5072+165.35  2.30  4.60  2.67  12.29  1,298,473.19 
5072+175.00  2.30  4.59  4.83  22.15  1,298,451.04 
5072+180.00  2.30  4.59  2.50  11.48  1,298,439.56 
5072+185.00  2.30  4.59  2.50  11.48  1,298,428.09 
5072+195.00  2.30  4.59  5.00  22.95  1,298,405.14 
5072+200.00  2.30  4.59  2.50  11.48  1,298,393.66 
5072+205.00  2.30  4.59  2.50  11.48  1,298,382.19 
5072+215.00  2.30  4.59  5.00  22.95  1,298,359.24 
5072+220.00  2.30  4.59  2.50  11.48  1,298,347.76 
5072+225.00  2.30  4.59  2.50  11.48  1,298,336.29 
5072+235.00  2.30  4.59  5.00  22.95  1,298,313.34 
5072+240.00  2.30  4.59  2.50  11.48  1,298,301.86 
5072+245.00  2.30  4.59  2.50  11.48  1,298,290.39 
5072+255.00  2.30  4.59  5.00  22.95  1,298,267.44 
5072+260.00  2.30  4.59  2.50  11.48  1,298,255.96 
5072+265.00  2.30  4.59  2.50  11.48  1,298,244.48 
5072+275.00  2.30  4.59  5.00  22.96  1,298,221.53 
5072+280.00  2.30  4.59  2.50  11.48  1,298,210.05 
5072+285.00  2.30  4.59  2.50  11.48  1,298,198.58 
5072+295.00  2.30  4.59  5.00  22.95  1,298,175.63 
5072+300.00  2.30  4.59  2.50  11.48  1,298,164.15 
5072+305.00  2.30  4.59  2.50  11.48  1,298,152.68 
5072+315.00  2.30  4.59  5.00  22.96  1,298,129.72 
5072+320.00  2.30  4.59  2.50  11.48  1,298,118.25 
5072+325.00  2.30  4.59  2.50  11.48  1,298,106.77 
5072+335.00  2.30  4.59  5.00  22.95  1,298,083.82 
5072+340.00  2.30  4.59  2.50  11.48  1,298,072.35 
5072+360.00  2.30  4.59  10.00  45.90  1,298,026.45 
5072+380.00  2.30  4.59  10.00  45.90  1,297,980.55 
5072+400.00  2.30  4.59  10.00  45.90  1,297,934.65 
5072+420.00  2.30  4.59  10.00  45.90  1,297,888.75 

638 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5072+440.00  2.30  4.59  10.00  45.91  1,297,842.84 


5072+460.00  2.30  4.59  10.00  45.91  1,297,796.93 
5072+480.00  2.30  4.59  10.00  45.90  1,297,751.03 
5072+500.00  2.30  4.59  10.00  45.90  1,297,705.13 
5072+520.00  2.30  4.59  10.00  45.90  1,297,659.23 
5072+540.00  2.30  4.59  10.00  45.90  1,297,613.33 
5072+560.00  2.30  4.59  10.00  45.90  1,297,567.43 
5072+580.00  2.30  4.59  10.00  45.90  1,297,521.53 
5072+600.00  2.30  4.59  10.00  45.90  1,297,475.63 
5072+620.00  2.30  4.59  10.00  45.90  1,297,429.73 
5072+640.00  2.30  4.59  10.00  45.90  1,297,383.83 
5072+660.00  2.30  4.59  10.00  45.90  1,297,337.93 
5072+660.00  2.30  4.59  0.00  0.00  1,297,337.93 
5072+680.00  2.30  4.59  10.00  45.90  1,297,292.03 
5072+700.00  2.30  4.59  10.00  45.90  1,297,246.13 
5072+720.00  2.30  4.59  10.00  45.90  1,297,200.23 
5072+740.00  2.30  4.59  10.00  45.90  1,297,154.33 
5072+760.00  2.30  4.59  10.00  45.90  1,297,108.43 
5072+760.00  2.30  4.59  0.00  0.00  1,297,108.43 
5072+780.00  2.30  4.59  10.00  45.90  1,297,062.53 
5072+795.00  2.30  4.59  7.50  34.43  1,297,028.10 
5072+800.00  2.30  4.59  2.50  11.48  1,297,016.63 
5072+820.00  2.30  4.59  10.00  45.90  1,296,970.73 
5072+840.00  2.30  4.59  10.00  45.90  1,296,924.83 
5072+860.00  2.30  4.59  10.00  45.90  1,296,878.93 
5072+880.00  2.30  4.59  10.00  45.90  1,296,833.03 
5072+900.00  2.30  4.59  10.00  45.90  1,296,787.13 
5072+920.00  2.30  4.59  10.00  45.90  1,296,741.23 
5072+940.00  2.30  4.59  10.00  45.90  1,296,695.33 
5072+960.00  2.30  4.59  10.00  45.90  1,296,649.43 
5072+980.00  2.30  4.59  10.00  45.90  1,296,603.53 
5073+000.00  2.30  4.59  10.00  45.90  1,296,557.63 
5073+020.00  2.30  4.59  10.00  45.90  1,296,511.73 
5073+040.00  2.30  4.59  10.00  45.90  1,296,465.83 
5073+060.00  2.30  4.59  10.00  45.90  1,296,419.93 
5073+080.00  2.30  4.59  10.00  45.90  1,296,374.03 
5073+100.00  2.30  4.59  10.00  45.90  1,296,328.13 
5073+120.00  2.30  4.59  10.00  45.90  1,296,282.23 
5073+140.00  2.30  4.59  10.00  45.90  1,296,236.33 
5073+160.00  2.30  4.59  10.00  45.90  1,296,190.43 
5073+180.00  2.30  4.59  10.00  45.90  1,296,144.53 
5073+200.00  2.30  4.59  10.00  45.90  1,296,098.63 
5073+220.00  2.30  4.59  10.00  45.90  1,296,052.73 
5073+240.00  2.30  4.59  10.00  45.90  1,296,006.83 
5073+260.00  2.30  4.59  10.00  45.90  1,295,960.93 

639 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5073+280.00  2.30  4.59  10.00  45.90  1,295,915.03 


5073+300.00  2.30  4.59  10.00  45.90  1,295,869.13 
5073+320.00  2.30  4.59  10.00  45.90  1,295,823.23 
5073+340.00  2.30  4.59  10.00  45.90  1,295,777.33 
5073+360.00  2.30  4.59  10.00  45.90  1,295,731.43 
5073+380.00  2.30  4.59  10.00  45.90  1,295,685.53 
5073+400.00  2.30  4.59  10.00  45.90  1,295,639.63 
5073+420.00  2.30  4.59  10.00  45.90  1,295,593.73 
5073+440.00  2.30  4.59  10.00  45.90  1,295,547.83 
5073+460.00  2.30  4.59  10.00  45.90  1,295,501.93 
5073+480.00  2.30  4.59  10.00  45.90  1,295,456.03 
5073+500.00  2.30  4.59  10.00  45.90  1,295,410.13 
5073+520.00  2.30  4.59  10.00  45.90  1,295,364.23 
5073+540.00  2.30  4.59  10.00  45.91  1,295,318.32 
5073+560.00  2.30  4.59  10.00  45.91  1,295,272.41 
5073+580.00  2.30  4.59  10.00  45.90  1,295,226.51 
5073+600.00  2.30  4.59  10.00  45.90  1,295,180.61 
5073+620.00  2.30  4.59  10.00  45.91  1,295,134.70 
5073+640.00  2.30  4.59  10.00  45.91  1,295,088.79 
5073+660.00  2.30  4.59  10.00  45.90  1,295,042.89 
5073+680.00  2.30  4.59  10.00  45.90  1,294,996.99 
5073+700.00  2.30  4.59  10.00  45.90  1,294,951.09 
5073+720.00  2.30  4.59  10.00  45.90  1,294,905.19 
5073+740.00  2.30  4.59  10.00  45.90  1,294,859.29 
5073+760.00  2.30  4.59  10.00  45.90  1,294,813.39 
5073+780.00  2.30  4.59  10.00  45.90  1,294,767.49 
5073+800.00  2.30  4.59  10.00  45.90  1,294,721.59 
5073+815.00  2.30  4.59  7.50  34.43  1,294,687.16 
5073+820.00  2.30  4.59  2.50  11.48  1,294,675.69 
5073+825.00  2.30  4.59  2.50  11.48  1,294,664.21 
5073+835.00  2.30  4.59  5.00  22.95  1,294,641.26 
5073+840.00  2.30  4.59  2.50  11.48  1,294,629.79 
5073+845.00  2.30  4.59  2.50  11.48  1,294,618.31 
5073+855.00  2.30  4.59  5.00  22.95  1,294,595.36 
5073+860.00  2.30  4.59  2.50  11.48  1,294,583.89 
5073+865.00  2.30  4.59  2.50  11.48  1,294,572.41 
5073+875.00  2.30  4.59  5.00  22.95  1,294,549.46 
5073+880.00  2.30  4.59  2.50  11.48  1,294,537.99 
5073+885.00  2.30  4.59  2.50  11.48  1,294,526.51 
5073+895.00  2.30  4.59  5.00  22.95  1,294,503.56 
5073+900.00  2.30  4.59  2.50  11.48  1,294,492.09 
5073+905.00  2.30  4.59  2.50  11.48  1,294,480.61 
5073+915.00  2.30  4.59  5.00  22.95  1,294,457.66 
5073+920.00  2.30  4.59  2.50  11.48  1,294,446.19 
5073+925.00  2.30  4.59  2.50  11.48  1,294,434.71 

640 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

5073+935.00  2.30  4.59  5.00  22.95  1,294,411.76 


5073+940.00  2.30  4.59  2.50  11.48  1,294,400.29 
5073+945.00  2.30  4.59  2.50  11.48  1,294,388.81 
5073+955.00  2.30  4.59  5.00  22.95  1,294,365.86 
5073+960.00  2.30  4.59  2.50  11.48  1,294,354.39 
5073+965.00  2.30  4.59  2.50  11.48  1,294,342.91 
5073+975.00  2.30  4.59  5.00  22.95  1,294,319.96 
5073+980.00  2.30  4.59  2.50  11.48  1,294,308.49 
5073+985.32  2.30  4.59  2.66  12.20  1,294,296.28 
5074+000.00  2.32  4.61  7.34  33.84  1,294,262.44 
5074+005.32  2.29  4.61  2.66  12.25  1,294,250.19 
5074+020.00  2.29  4.59  7.34  33.68  1,294,216.50 
5074+040.00  2.29  4.59  10.00  45.88  1,294,170.62 
5074+060.00  2.29  4.59  10.00  45.88  1,294,124.74 
5074+080.00  2.29  4.59  10.00  45.88  1,294,078.86 
5074+100.00  2.29  4.59  10.00  45.88  1,294,032.98 
5074+120.00  2.29  4.59  10.00  45.88  1,293,987.10 
5074+140.00  2.29  4.59  10.00  45.88  1,293,941.22 
5074+160.00  2.29  4.59  10.00  45.88  1,293,895.34 
5074+180.00  2.29  4.59  10.00  45.88  1,293,849.46 
5074+200.00  2.29  4.59  10.00  45.88  1,293,803.58 
5074+220.00  2.29  4.59  10.00  45.88  1,293,757.70 
5074+240.00  2.29  4.59  10.00  45.88  1,293,711.82 
5074+260.00  2.29  4.59  10.00  45.88  1,293,665.94 
5074+280.00  2.29  4.59  10.00  45.88  1,293,620.06 
5074+300.00  2.29  4.59  10.00  45.88  1,293,574.18 
5074+320.00  2.29  4.59  10.00  45.88  1,293,528.30 
5074+340.00  2.29  4.59  10.00  45.88  1,293,482.42 
5074+360.00  2.29  4.59  10.00  45.88  1,293,436.54 
5074+380.00  2.29  4.59  10.00  45.88  1,293,390.66 
5074+400.00  2.29  4.59  10.00  45.88  1,293,344.78 
5074+400.19  2.29  4.59  0.09  0.43  1,293,344.35 
6000+617.91  2.29  2.29        1,300,000.00 
6000+620.00  2.29  4.59  1.04  4.79  1,299,995.21 
6000+640.00  2.29  4.59  10.00  45.88  1,299,949.33 
6000+660.00  2.29  4.59  10.00  45.88  1,299,903.45 
6000+680.00  2.29  4.59  10.00  45.88  1,299,857.57 
6000+700.00  2.29  4.59  10.00  45.88  1,299,811.69 
6000+700.01  2.29  4.59  0.00  0.02  1,299,811.67 
6000+720.00  2.29  4.59  10.00  45.86  1,299,765.81 
6000+740.00  2.29  4.59  10.00  45.88  1,299,719.93 
6000+760.00  2.29  4.59  10.00  45.88  1,299,674.05 
6000+780.00  2.29  4.59  10.00  45.88  1,299,628.17 
6000+800.00  2.29  4.59  10.00  45.88  1,299,582.29 
6000+800.00  2.29  4.59  0.00  0.00  1,299,582.29 

641 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6000+820.00  2.29  4.59  10.00  45.88  1,299,536.41 


6000+840.00  2.29  4.59  10.00  45.88  1,299,490.53 
6000+860.00  2.29  4.59  10.00  45.88  1,299,444.65 
6000+880.00  2.29  4.59  10.00  45.88  1,299,398.77 
6000+880.00  2.29  4.59  0.00  0.00  1,299,398.77 
6000+900.00  2.29  4.59  10.00  45.88  1,299,352.89 
6000+920.00  2.29  4.59  10.00  45.88  1,299,307.01 
6000+940.00  2.29  4.59  10.00  45.88  1,299,261.13 
6000+960.00  2.29  4.59  10.00  45.88  1,299,215.25 
6000+980.00  2.29  4.59  10.00  45.88  1,299,169.37 
6001+000.00  2.29  4.59  10.00  45.88  1,299,123.49 
6001+020.00  2.29  4.59  10.00  45.88  1,299,077.61 
6001+040.00  2.29  4.59  10.00  45.88  1,299,031.73 
6001+060.00  2.29  4.59  10.00  45.88  1,298,985.85 
6001+080.00  2.29  4.59  10.00  45.88  1,298,939.97 
6001+100.00  2.29  4.59  10.00  45.88  1,298,894.09 
6001+120.00  2.29  4.59  10.00  45.88  1,298,848.21 
6001+140.00  2.29  4.59  10.00  45.88  1,298,802.33 
6001+160.00  2.29  4.59  10.00  45.88  1,298,756.45 
6001+180.00  2.29  4.59  10.00  45.88  1,298,710.57 
6001+200.00  2.29  4.59  10.00  45.88  1,298,664.69 
6001+220.00  2.29  4.59  10.00  45.88  1,298,618.81 
6001+240.00  2.29  4.59  10.00  45.88  1,298,572.93 
6001+260.00  2.29  4.59  10.00  45.88  1,298,527.05 
6001+280.00  2.29  4.59  10.00  45.88  1,298,481.17 
6001+300.00  2.29  4.59  10.00  45.88  1,298,435.29 
6001+320.00  2.29  4.59  10.00  45.88  1,298,389.41 
6001+340.00  2.29  4.59  10.00  45.88  1,298,343.53 
6001+360.00  2.29  4.59  10.00  45.88  1,298,297.65 
6001+380.00  2.29  4.59  10.00  45.88  1,298,251.77 
6001+400.00  2.29  4.59  10.00  45.88  1,298,205.89 
6001+420.00  2.29  4.59  10.00  45.88  1,298,160.01 
6001+440.00  2.30  4.59  10.00  45.89  1,298,114.12 
6001+460.00  2.30  4.59  10.00  45.90  1,298,068.22 
6001+480.00  2.29  4.59  10.00  45.89  1,298,022.33 
6001+500.00  2.30  4.59  10.00  45.89  1,297,976.44 
6001+520.00  2.29  4.59  10.00  45.89  1,297,930.55 
6001+540.00  2.30  4.59  10.00  45.89  1,297,884.66 
6001+560.00  2.30  4.59  10.00  45.90  1,297,838.76 
6001+580.00  2.29  4.59  10.00  45.89  1,297,792.87 
6001+600.00  2.29  4.59  10.00  45.88  1,297,746.99 
6001+620.00  2.30  4.59  10.00  45.89  1,297,701.10 
6001+640.00  2.30  4.59  10.00  45.90  1,297,655.20 
6001+660.00  2.30  4.59  10.00  45.90  1,297,609.30 
6001+680.00  2.30  4.59  10.00  45.90  1,297,563.40 

642 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6001+700.00  2.29  4.59  10.00  45.89  1,297,517.51 


6001+720.00  2.30  4.59  10.00  45.89  1,297,471.62 
6001+740.00  2.30  4.59  10.00  45.90  1,297,425.72 
6001+760.00  2.30  4.59  10.00  45.90  1,297,379.82 
6001+780.00  2.30  4.59  10.00  45.90  1,297,333.92 
6001+800.00  2.30  4.59  10.00  45.90  1,297,288.02 
6001+820.00  2.29  4.59  10.00  45.89  1,297,242.13 
6001+840.00  2.30  4.59  10.00  45.89  1,297,196.24 
6001+860.00  2.30  4.59  10.00  45.90  1,297,150.34 
6001+880.00  2.30  4.59  10.00  45.90  1,297,104.44 
6001+900.00  2.30  4.59  10.00  45.90  1,297,058.54 
6001+920.00  2.30  4.59  10.00  45.90  1,297,012.64 
6001+940.00  2.29  4.59  10.00  45.89  1,296,966.75 
6001+960.00  2.30  4.59  10.00  45.89  1,296,920.86 
6001+980.00  2.29  4.59  10.00  45.89  1,296,874.97 
6002+000.00  2.30  4.59  10.00  45.89  1,296,829.08 
6002+020.00  2.29  4.59  10.00  45.89  1,296,783.19 
6002+040.00  2.30  4.59  10.00  45.89  1,296,737.30 
6002+060.00  2.30  4.59  10.00  45.90  1,296,691.40 
6002+080.00  2.30  4.59  10.00  45.90  1,296,645.50 
6002+100.00  2.29  4.59  10.00  45.89  1,296,599.61 
6002+120.00  2.30  4.59  10.00  45.89  1,296,553.72 
6002+140.00  2.30  4.59  10.00  45.90  1,296,507.82 
6002+160.00  2.30  4.59  10.00  45.90  1,296,461.92 
6002+180.00  2.29  4.59  10.00  45.89  1,296,416.03 
6002+200.00  2.30  4.59  10.00  45.89  1,296,370.14 
6002+220.00  2.30  4.59  10.00  45.90  1,296,324.24 
6002+240.00  2.29  4.59  10.00  45.89  1,296,278.35 
6002+260.00  2.29  4.59  10.00  45.88  1,296,232.47 
6002+280.00  2.29  4.59  10.00  45.88  1,296,186.59 
6002+300.00  2.29  4.59  10.00  45.88  1,296,140.71 
6002+320.00  2.29  4.59  10.00  45.88  1,296,094.83 
6002+340.00  2.29  4.59  10.00  45.88  1,296,048.95 
6002+360.00  2.29  4.59  10.00  45.88  1,296,003.07 
6002+380.00  2.29  4.59  10.00  45.88  1,295,957.19 
6002+400.00  2.29  4.59  10.00  45.88  1,295,911.31 
6002+420.00  2.29  4.59  10.00  45.88  1,295,865.43 
6002+440.00  2.29  4.59  10.00  45.88  1,295,819.55 
6002+460.00  2.29  4.59  10.00  45.88  1,295,773.67 
6002+480.00  2.29  4.59  10.00  45.88  1,295,727.79 
6002+500.00  2.29  4.59  10.00  45.88  1,295,681.91 
6002+520.00  2.29  4.59  10.00  45.88  1,295,636.03 
6002+540.00  2.29  4.59  10.00  45.88  1,295,590.15 
6002+560.00  2.30  4.59  10.00  45.89  1,295,544.26 
6002+580.00  2.29  4.59  10.00  45.89  1,295,498.37 

643 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6002+600.00  2.30  4.59  10.00  45.89  1,295,452.48 


6002+620.00  2.30  4.59  10.00  45.90  1,295,406.58 
6002+640.00  2.30  4.59  10.00  45.90  1,295,360.68 
6002+660.00  2.30  4.59  10.00  45.90  1,295,314.78 
6002+680.00  2.30  4.59  10.00  45.90  1,295,268.88 
6002+700.00  2.29  4.59  10.00  45.89  1,295,222.99 
6002+720.00  2.30  4.59  10.00  45.89  1,295,177.10 
6002+740.00  2.30  4.59  10.00  45.90  1,295,131.20 
6002+760.00  2.29  4.59  10.00  45.89  1,295,085.31 
6002+780.00  2.29  4.59  10.00  45.88  1,295,039.43 
6002+800.00  2.30  4.59  10.00  45.89  1,294,993.54 
6002+820.00  2.30  4.59  10.00  45.90  1,294,947.64 
6002+830.00  2.30  4.59  5.00  22.95  1,294,924.69 
6002+830.00  2.30  4.59  0.00  0.00  1,294,924.69 
6002+840.00  2.30  4.59  5.00  22.95  1,294,901.74 
6002+860.00  2.30  4.59  10.00  45.90  1,294,855.84 
6002+880.00  2.30  4.59  10.00  45.90  1,294,809.94 
6002+900.00  2.30  4.59  10.00  45.90  1,294,764.04 
6002+920.00  2.29  4.59  10.00  45.89  1,294,718.15 
6002+940.00  2.30  4.59  10.00  45.89  1,294,672.26 
6002+960.00  2.30  4.59  10.00  45.90  1,294,626.36 
6002+980.00  2.30  4.59  10.00  45.90  1,294,580.46 
6002+980.00  2.30  4.59  0.00  0.00  1,294,580.46 
6003+000.00  2.29  4.59  10.00  45.89  1,294,534.57 
6003+020.00  2.30  4.59  10.00  45.89  1,294,488.68 
6003+040.00  2.30  4.59  10.00  45.90  1,294,442.78 
6003+060.00  2.30  4.59  10.00  45.90  1,294,396.88 
6003+080.00  2.29  4.59  10.00  45.89  1,294,350.99 
6003+100.00  2.30  4.59  10.00  45.89  1,294,305.10 
6003+120.00  2.30  4.59  10.00  45.90  1,294,259.20 
6003+140.00  2.30  4.59  10.00  45.90  1,294,213.30 
6003+160.00  2.29  4.59  10.00  45.89  1,294,167.41 
6003+180.00  2.30  4.59  10.00  45.89  1,294,121.52 
6003+200.00  2.30  4.59  10.00  45.90  1,294,075.62 
6003+220.00  2.30  4.59  10.00  45.90  1,294,029.72 
6003+240.00  2.30  4.59  10.00  45.90  1,293,983.82 
6003+260.00  2.30  4.59  10.00  45.90  1,293,937.92 
6003+280.00  2.30  4.59  10.00  45.90  1,293,892.02 
6003+300.00  2.30  4.59  10.00  45.90  1,293,846.12 
6003+320.00  2.30  4.59  10.00  45.90  1,293,800.22 
6003+340.00  2.30  4.59  10.00  45.90  1,293,754.32 
6003+360.00  2.30  4.59  10.00  45.90  1,293,708.42 
6003+380.00  2.30  4.59  10.00  45.90  1,293,662.52 
6003+400.00  2.29  4.59  10.00  45.89  1,293,616.63 
6003+420.00  2.30  4.59  10.00  45.89  1,293,570.74 

644 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6003+440.00  2.30  4.59  10.00  45.90  1,293,524.84 


6003+460.00  2.29  4.59  10.00  45.89  1,293,478.95 
6003+480.00  2.29  4.59  10.00  45.88  1,293,433.07 
6003+500.00  2.30  4.59  10.00  45.89  1,293,387.18 
6003+520.00  2.30  4.59  10.00  45.90  1,293,341.28 
6003+536.24  2.29  4.59  8.12  37.26  1,293,304.02 
6003+536.24  2.30  4.59  0.00  0.00  1,293,304.02 
6003+536.24  2.51  4.80  0.00  0.00  1,293,304.02 
6003+540.00  2.51  5.02  1.88  9.43  1,293,294.59 
6003+560.00  2.51  5.02  10.00  50.16  1,293,244.43 
6003+568.24  2.51  5.02  4.12  20.66  1,293,223.77 
6003+568.24  2.29  4.80  0.00  0.00  1,293,223.76 
6003+568.24  2.29  4.59  0.00  0.00  1,293,223.76 
6003+580.00  2.30  4.59  5.88  26.98  1,293,196.78 
6003+600.00  2.30  4.59  10.00  45.90  1,293,150.88 
6003+620.00  2.29  4.59  10.00  45.89  1,293,104.99 
6003+640.00  2.29  4.59  10.00  45.88  1,293,059.11 
6003+660.00  2.30  4.59  10.00  45.89  1,293,013.22 
6003+680.00  2.30  4.59  10.00  45.90  1,292,967.32 
6003+700.00  2.29  4.59  10.00  45.89  1,292,921.43 
6003+720.00  2.29  4.59  10.00  45.88  1,292,875.55 
6003+740.00  2.30  4.59  10.00  45.89  1,292,829.66 
6003+760.00  2.30  4.59  10.00  45.90  1,292,783.76 
6003+780.00  2.30  4.59  10.00  45.90  1,292,737.86 
6003+800.00  2.30  4.59  10.00  45.90  1,292,691.96 
6003+820.00  2.30  4.59  10.00  45.90  1,292,646.06 
6003+840.00  2.30  4.59  10.00  45.90  1,292,600.16 
6003+860.00  2.30  4.59  10.00  45.90  1,292,554.26 
6003+880.00  2.30  4.59  10.00  45.90  1,292,508.36 
6003+900.00  2.29  4.59  10.00  45.89  1,292,462.47 
6003+900.00  2.29  4.59  0.00  0.00  1,292,462.47 
6003+920.00  2.29  4.59  10.00  45.88  1,292,416.59 
6003+940.00  2.30  4.59  10.00  45.89  1,292,370.70 
6003+960.00  2.30  4.59  10.00  45.90  1,292,324.80 
6003+974.92  2.30  4.59  7.46  34.25  1,292,290.55 
6003+980.00  2.30  4.60  2.54  11.67  1,292,278.89 
6004+000.00  2.32  4.62  10.00  46.24  1,292,232.65 
6004+020.00  2.35  4.67  10.00  46.68  1,292,185.97 
6004+040.00  2.37  4.71  10.00  47.14  1,292,138.83 
6004+060.00  2.39  4.76  10.00  47.61  1,292,091.22 
6004+080.00  2.42  4.81  10.00  48.08  1,292,043.14 
6004+100.00  2.44  4.86  10.00  48.56  1,291,994.58 
6004+120.00  2.46  4.90  10.00  49.04  1,291,945.54 
6004+124.92  2.47  4.93  2.46  12.14  1,291,933.39 
6004+140.00  2.47  4.94  7.54  37.24  1,291,896.15 

645 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6004+160.00  2.47  4.94  10.00  49.40  1,291,846.75 


6004+180.00  2.47  4.94  10.00  49.40  1,291,797.35 
6004+200.00  2.47  4.94  10.00  49.40  1,291,747.95 
6004+220.00  2.47  4.94  10.00  49.41  1,291,698.54 
6004+240.00  2.47  4.94  10.00  49.41  1,291,649.13 
6004+260.00  2.47  4.94  10.00  49.40  1,291,599.73 
6004+280.00  2.47  4.94  10.00  49.40  1,291,550.33 
6004+300.00  2.47  4.94  10.00  49.41  1,291,500.92 
6004+320.00  2.47  4.94  10.00  49.41  1,291,451.51 
6004+340.00  2.47  4.94  10.00  49.40  1,291,402.11 
6004+355.41  2.47  4.94  7.71  38.08  1,291,364.03 
6004+360.00  2.47  4.94  2.29  11.32  1,291,352.71 
6004+380.00  2.44  4.91  10.00  49.05  1,291,303.66 
6004+400.00  2.42  4.86  10.00  48.56  1,291,255.10 
6004+420.00  2.39  4.81  10.00  48.09  1,291,207.01 
6004+440.00  2.37  4.76  10.00  47.63  1,291,159.38 
6004+460.00  2.35  4.72  10.00  47.16  1,291,112.22 
6004+480.00  2.32  4.67  10.00  46.69  1,291,065.53 
6004+500.00  2.30  4.62  10.00  46.24  1,291,019.29 
6004+505.41  2.30  4.60  2.71  12.44  1,291,006.85 
6004+520.00  2.30  4.59  7.29  33.47  1,290,973.38 
6004+540.00  2.30  4.59  10.00  45.90  1,290,927.48 
6004+560.00  2.29  4.59  10.00  45.89  1,290,881.59 
6004+580.00  2.29  4.59  10.00  45.88  1,290,835.71 
6004+600.00  2.29  4.59  10.00  45.88  1,290,789.83 
6004+615.00  2.29  4.59  7.50  34.41  1,290,755.42 
6004+615.00  2.29  4.59  0.00  0.00  1,290,755.42 
6004+620.00  2.29  4.59  2.50  11.47  1,290,743.95 
6004+640.00  2.29  4.59  10.00  45.88  1,290,698.07 
6004+660.00  2.29  4.59  10.00  45.88  1,290,652.19 
6004+680.00  2.29  4.59  10.00  45.88  1,290,606.31 
6004+700.00  2.29  4.59  10.00  45.88  1,290,560.43 
6004+720.00  2.29  4.59  10.00  45.88  1,290,514.55 
6004+740.00  2.29  4.59  10.00  45.88  1,290,468.67 
6004+760.00  2.29  4.59  10.00  45.88  1,290,422.79 
6004+780.00  2.30  4.59  10.00  45.89  1,290,376.90 
6004+800.00  2.30  4.59  10.00  45.90  1,290,331.00 
6004+820.00  2.30  4.59  10.00  45.90  1,290,285.10 
6004+840.00  2.29  4.59  10.00  45.89  1,290,239.21 
6004+860.00  2.30  4.59  10.00  45.89  1,290,193.32 
6004+880.00  2.30  4.59  10.00  45.90  1,290,147.42 
6004+900.00  2.30  4.59  10.00  45.90  1,290,101.52 
6004+920.00  2.30  4.59  10.00  45.90  1,290,055.62 
6004+940.00  2.29  4.59  10.00  45.89  1,290,009.73 
6004+960.00  2.30  4.59  10.00  45.89  1,289,963.84 

646 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6004+980.00  2.30  4.59  10.00  45.90  1,289,917.94 


6005+000.00  2.29  4.59  10.00  45.89  1,289,872.05 
6005+020.00  2.30  4.59  10.00  45.89  1,289,826.16 
6005+040.00  2.30  4.59  10.00  45.90  1,289,780.26 
6005+060.00  2.29  4.59  10.00  45.89  1,289,734.37 
6005+080.00  2.30  4.59  10.00  45.89  1,289,688.48 
6005+100.00  2.30  4.59  10.00  45.90  1,289,642.58 
6005+104.49  2.29  4.59  2.24  10.30  1,289,632.28 
6005+120.00  2.28  4.58  7.76  35.48  1,289,596.79 
6005+140.00  2.26  4.54  10.00  45.43  1,289,551.36 
6005+160.00  2.24  4.51  10.00  45.06  1,289,506.30 
6005+180.00  2.23  4.47  10.00  44.70  1,289,461.60 
6005+200.00  2.21  4.43  10.00  44.34  1,289,417.26 
6005+220.00  2.19  4.40  10.00  43.99  1,289,373.27 
6005+240.00  2.18  4.38  10.00  43.75  1,289,329.52 
6005+254.49  2.20  4.38  7.24  31.73  1,289,297.79 
6005+260.00  2.20  4.39  2.76  12.10  1,289,285.69 
6005+280.00  2.20  4.39  10.00  43.92  1,289,241.77 
6005+300.00  2.20  4.39  10.00  43.92  1,289,197.85 
6005+320.00  2.20  4.39  10.00  43.92  1,289,153.93 
6005+340.00  2.20  4.39  10.00  43.92  1,289,110.01 
6005+360.00  2.20  4.39  10.00  43.92  1,289,066.09 
6005+361.69  2.20  4.39  0.85  3.72  1,289,062.37 
6005+380.00  2.18  4.38  9.15  40.06  1,289,022.31 
6005+400.00  2.19  4.38  10.00  43.75  1,288,978.56 
6005+420.00  2.21  4.41  10.00  44.06  1,288,934.50 
6005+440.00  2.23  4.44  10.00  44.41  1,288,890.09 
6005+460.00  2.25  4.48  10.00  44.76  1,288,845.33 
6005+480.00  2.27  4.51  10.00  45.12  1,288,800.21 
6005+500.00  2.28  4.55  10.00  45.49  1,288,754.72 
6005+511.69  2.29  4.58  5.85  26.77  1,288,727.95 
6005+520.00  2.29  4.59  4.15  19.06  1,288,708.90 
6005+540.00  2.29  4.59  10.00  45.88  1,288,663.02 
6005+560.00  2.29  4.59  10.00  45.88  1,288,617.14 
6005+580.00  2.29  4.59  10.00  45.88  1,288,571.26 
6005+600.00  2.29  4.59  10.00  45.88  1,288,525.38 
6005+620.00  2.29  4.59  10.00  45.88  1,288,479.50 
6005+640.00  2.29  4.59  10.00  45.88  1,288,433.62 
6005+660.00  2.29  4.59  10.00  45.88  1,288,387.74 
6005+680.00  2.29  4.59  10.00  45.88  1,288,341.86 
6005+700.00  2.29  4.59  10.00  45.88  1,288,295.98 
6005+720.00  2.29  4.59  10.00  45.88  1,288,250.10 
6005+740.00  2.29  4.59  10.00  45.88  1,288,204.22 
6005+760.00  2.29  4.59  10.00  45.88  1,288,158.34 
6005+780.00  2.29  4.59  10.00  45.88  1,288,112.46 

647 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 6006+000.00   

6005+800.00  2.29  4.59  10.00  45.88  1,288,066.58 


6005+820.00  2.29  4.59  10.00  45.88  1,288,020.70 
6005+840.00  2.29  4.59  10.00  45.88  1,287,974.82 
6005+860.00  2.29  4.59  10.00  45.88  1,287,928.94 
6005+880.00  2.29  4.59  10.00  45.88  1,287,883.06 
6005+900.00  2.29  4.59  10.00  45.88  1,287,837.18 
6005+920.00  2.29  4.59  10.00  45.88  1,287,791.30 
6005+940.00  2.29  4.59  10.00  45.88  1,287,745.42 
6005+960.00  2.29  4.59  10.00  45.88  1,287,699.54 
6005+980.00  2.29  4.59  10.00  45.88  1,287,653.66 
6006+000.00  2.29  4.59  10.00  45.88  1,287,607.78 
 

TABLA 48 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 5073+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 5074+400.19   

0+020.00  0.08  0.08        1,300,000.00 


0+040.00  0.32  0.39  10.00  3.94  1,299,996.06 
0+059.92  0.73  1.05  9.96  10.41  1,299,985.65 
0+060.00  0.73  1.46  0.04  0.06  1,299,985.59 
0+080.00  1.26  1.99  10.00  19.89  1,299,965.70 
0+100.00  1.81  3.07  10.00  30.72  1,299,934.98 
0+100.17  1.82  3.63  0.08  0.31  1,299,934.68 
0+120.00  2.16  3.98  9.92  39.44  1,299,895.23 
0+140.00  2.27  4.43  10.00  44.28  1,299,850.95 
0+160.00  2.29  4.56  10.00  45.61  1,299,805.34 
0+160.09  2.29  4.59  0.04  0.19  1,299,805.15 
0+180.00  2.29  4.59  9.96  45.69  1,299,759.46 
0+200.00  2.29  4.59  10.00  45.88  1,299,713.58 
0+220.00  2.29  4.59  10.00  45.87  1,299,667.71 
0+240.00  2.29  4.59  10.00  45.87  1,299,621.84 
0+260.00  2.29  4.59  10.00  45.88  1,299,575.96 
0+280.00  2.29  4.59  10.00  45.88  1,299,530.08 
0+300.00  2.29  4.59  10.00  45.88  1,299,484.20 
0+320.00  2.29  4.59  10.00  45.88  1,299,438.32 
0+340.00  2.29  4.59  10.00  45.88  1,299,392.44 
0+360.00  2.29  4.59  10.00  45.88  1,299,346.56 
0+380.00  2.29  4.59  10.00  45.88  1,299,300.68 
0+400.00  2.29  4.59  10.00  45.88  1,299,254.80 
0+420.00  2.29  4.59  10.00  45.88  1,299,208.92 
0+440.00  2.29  4.59  10.00  45.88  1,299,163.04 

648 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 5074+400.19   

0+460.00  2.30  4.59  10.00  45.89  1,299,117.15 


0+480.00  2.29  4.59  10.00  45.89  1,299,071.26 
0+500.00  2.29  4.59  10.00  45.86  1,299,025.40 
0+520.00  2.29  4.58  10.00  45.84  1,298,979.56 
0+540.00  2.29  4.58  10.00  45.84  1,298,933.72 
0+560.00  2.29  4.58  10.00  45.84  1,298,887.88 
0+580.00  2.29  4.58  10.00  45.84  1,298,842.04 
0+600.00  2.29  4.58  10.00  45.84  1,298,796.20 
0+620.00  2.29  4.59  10.00  45.85  1,298,750.35 
0+640.00  2.29  4.59  10.00  45.85  1,298,704.50 
0+660.00  2.29  4.59  10.00  45.86  1,298,658.64 
0+680.00  2.29  4.59  10.00  45.88  1,298,612.76 
0+700.00  2.29  4.59  10.00  45.88  1,298,566.88 
0+720.00  2.29  4.59  10.00  45.88  1,298,521.00 
0+740.00  2.29  4.59  10.00  45.88  1,298,475.12 
0+760.00  2.29  4.59  10.00  45.88  1,298,429.24 
0+780.00  2.29  4.59  10.00  45.88  1,298,383.36 
0+800.00  2.29  4.59  10.00  45.88  1,298,337.48 
0+820.00  2.29  4.59  10.00  45.88  1,298,291.60 
0+840.00  2.29  4.59  10.00  45.88  1,298,245.72 
0+860.00  2.29  4.59  10.00  45.88  1,298,199.84 
0+880.00  2.29  4.59  10.00  45.88  1,298,153.96 
0+900.00  2.29  4.59  10.00  45.88  1,298,108.08 
0+920.00  2.29  4.59  10.00  45.88  1,298,062.20 
0+940.00  2.29  4.59  10.00  45.88  1,298,016.32 
0+960.00  2.29  4.59  10.00  45.88  1,297,970.44 
0+980.00  2.29  4.59  10.00  45.88  1,297,924.56 
1+000.00  2.29  4.59  10.00  45.88  1,297,878.68 
1+020.00  2.29  4.59  10.00  45.88  1,297,832.80 
1+040.00  2.29  4.59  10.00  45.88  1,297,786.92 
1+060.00  2.29  4.59  10.00  45.88  1,297,741.04 
1+080.00  2.29  4.59  10.00  45.88  1,297,695.16 
1+100.00  2.29  4.59  10.00  45.88  1,297,649.28 
1+120.00  2.29  4.59  10.00  45.88  1,297,603.40 
1+140.00  2.29  4.59  10.00  45.88  1,297,557.52 
1+160.00  2.29  4.59  10.00  45.88  1,297,511.64 
1+180.00  2.29  4.59  10.00  45.86  1,297,465.78 
1+200.00  2.29  4.58  10.00  45.84  1,297,419.94 
1+220.00  2.29  4.58  10.00  45.84  1,297,374.10 
1+240.00  2.29  4.58  10.00  45.84  1,297,328.26 
1+260.00  2.29  4.58  10.00  45.84  1,297,282.42 
1+280.00  2.29  4.58  10.00  45.84  1,297,236.58 
1+300.00  2.30  4.59  10.00  45.87  1,297,190.71 
1+320.00  2.30  4.59  10.00  45.90  1,297,144.81 
1+340.00  2.30  4.59  10.00  45.90  1,297,098.91 

649 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 5071+500 AL 5074+400.19   

1+360.00  2.29  4.59  10.00  45.89  1,297,053.02 


1+380.00  2.30  4.59  10.00  45.89  1,297,007.13 
1+400.00  2.30  4.59  10.00  45.90  1,296,961.23 
1+420.00  2.30  4.59  10.00  45.90  1,296,915.33 
1+440.00  2.29  4.59  10.00  45.89  1,296,869.44 
1+460.00  2.30  4.59  10.00  45.89  1,296,823.55 
1+480.00  2.30  4.59  10.00  45.90  1,296,777.65 
1+500.00  2.30  4.59  10.00  45.92  1,296,731.73 
1+520.00  2.30  4.59  10.00  45.94  1,296,685.79 
1+540.00  2.30  4.59  10.00  45.94  1,296,639.85 
1+560.00  2.30  4.59  10.00  45.94  1,296,593.91 
1+580.00  2.30  4.59  10.00  45.94  1,296,547.97 
1+600.00  2.30  4.59  10.00  45.94  1,296,502.03 
1+620.00  2.29  4.59  10.00  45.91  1,296,456.12 
1+640.00  2.29  4.59  10.00  45.88  1,296,410.24 
1+660.00  2.29  4.59  10.00  45.88  1,296,364.36 
1+660.09  2.29  4.59  0.04  0.19  1,296,364.17 
1+680.00  2.27  4.56  9.96  45.45  1,296,318.72 
1+700.00  2.16  4.43  10.00  44.33  1,296,274.39 
1+720.00  1.82  3.98  10.00  39.82  1,296,234.57 
1+720.00  1.82  3.64  0.00  0.00  1,296,234.57 
1+740.00  1.26  3.08  10.00  30.82  1,296,203.75 
1+760.00  0.74  2.00  10.00  19.99  1,296,183.76 
1+760.25  0.73  1.47  0.13  0.19  1,296,183.57 
1+780.00  0.32  1.05  9.87  10.35  1,296,173.23 
1+800.00  0.08  0.40  10.00  3.98  1,296,169.25 
1+820.00  0.00  0.08  10.00  0.79  1,296,168.46 
 

TABLA 49 CÁLCULO DE ACARREOS DE BALASTO DEL TRAMO 6017+000 AL 6030+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6017+000.00  2.35  2.35        1,300,000.00 


6017+020.00  2.31  4.65  10.00  46.54  1,299,953.46 
6017+027.24  2.29  4.60  3.62  16.66  1,299,936.80 
6017+040.00  2.29  4.59  6.38  29.27  1,299,907.53 
6017+060.00  2.29  4.59  10.00  45.88  1,299,861.65 
6017+080.00  2.29  4.59  10.00  45.88  1,299,815.77 
6017+100.00  2.29  4.59  10.00  45.88  1,299,769.89 
6017+120.00  2.29  4.59  10.00  45.88  1,299,724.01 
6017+140.00  2.29  4.59  10.00  45.88  1,299,678.13 

650 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6017+160.00  2.29  4.59  10.00  45.88  1,299,632.25 


6017+180.00  2.29  4.59  10.00  45.88  1,299,586.37 
6017+200.00  2.29  4.59  10.00  45.88  1,299,540.49 
6017+220.00  2.29  4.59  10.00  45.88  1,299,494.61 
6017+240.00  2.29  4.59  10.00  45.88  1,299,448.73 
6017+260.00  2.29  4.59  10.00  45.88  1,299,402.85 
6017+280.00  2.29  4.59  10.00  45.88  1,299,356.97 
6017+300.00  2.29  4.59  10.00  45.88  1,299,311.09 
6017+320.00  2.29  4.59  10.00  45.88  1,299,265.21 
6017+340.00  2.30  4.59  10.00  45.89  1,299,219.32 
6017+360.00  2.29  4.59  10.00  45.89  1,299,173.43 
6017+380.00  2.30  4.59  10.00  45.89  1,299,127.54 
6017+400.00  2.29  4.59  10.00  45.89  1,299,081.65 
6017+420.00  2.29  4.59  10.00  45.88  1,299,035.77 
6017+440.00  2.30  4.59  10.00  45.89  1,298,989.88 
6017+460.00  2.30  4.59  10.00  45.90  1,298,943.98 
6017+480.00  2.30  4.59  10.00  45.90  1,298,898.08 
6017+500.00  2.30  4.59  10.00  45.90  1,298,852.18 
6017+520.00  2.29  4.59  10.00  45.89  1,298,806.29 
6017+540.00  2.29  4.59  10.00  45.88  1,298,760.41 
6017+560.00  2.30  4.59  10.00  45.89  1,298,714.52 
6017+579.55  2.30  4.59  9.78  44.87  1,298,669.65 
6017+580.00  2.30  4.59  0.22  1.03  1,298,668.62 
6017+600.00  2.33  4.63  10.00  46.29  1,298,622.33 
6017+606.68  2.35  4.68  3.34  15.63  1,298,606.70 
6017+606.68  2.35  4.69  0.00  0.00  1,298,606.70 
6017+606.68  2.35  4.69  0.00  0.00  1,298,606.69 
6017+620.00  2.37  4.72  6.66  31.41  1,298,575.29 
6017+640.00  2.41  4.78  10.00  47.82  1,298,527.47 
6017+660.00  2.45  4.86  10.00  48.62  1,298,478.85 
6017+670.68  2.47  4.92  5.34  26.30  1,298,452.55 
6017+670.68  2.47  4.95  0.00  0.00  1,298,452.55 
6017+670.68  2.47  4.95  0.00  0.00  1,298,452.55 
6017+680.00  2.49  4.97  4.66  23.13  1,298,429.42 
6017+700.00  2.53  5.03  10.00  50.25  1,298,379.17 
6017+720.00  2.58  5.11  10.00  51.09  1,298,328.08 
6017+729.55  2.60  5.17  4.78  24.71  1,298,303.37 
6017+740.00  2.60  5.19  5.22  27.13  1,298,276.24 
6017+760.00  2.60  5.19  10.00  51.94  1,298,224.30 
6017+780.00  2.60  5.19  10.00  51.94  1,298,172.36 
6017+800.00  2.60  5.19  10.00  51.94  1,298,120.42 
6017+820.00  2.60  5.19  10.00  51.94  1,298,068.48 
6017+840.00  2.60  5.19  10.00  51.94  1,298,016.54 
6017+860.00  2.60  5.19  10.00  51.94  1,297,964.60 
6017+880.00  2.60  5.19  10.00  51.94  1,297,912.66 

651 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6017+900.00  2.60  5.19  10.00  51.94  1,297,860.72 


6017+902.74  2.60  5.19  1.37  7.12  1,297,853.59 
6017+920.00  2.56  5.16  8.63  44.50  1,297,809.09 
6017+940.00  2.52  5.08  10.00  50.78  1,297,758.31 
6017+960.00  2.48  4.99  10.00  49.94  1,297,708.37 
6017+980.00  2.44  4.91  10.00  49.11  1,297,659.26 
6018+000.00  2.40  4.83  10.00  48.31  1,297,610.95 
6018+020.00  2.36  4.75  10.00  47.53  1,297,563.42 
6018+040.00  2.32  4.68  10.00  46.75  1,297,516.67 
6018+052.74  2.30  4.61  6.37  29.39  1,297,487.28 
6018+060.00  2.30  4.59  3.63  16.65  1,297,470.63 
6018+080.00  2.30  4.59  10.00  45.90  1,297,424.73 
6018+100.00  2.29  4.59  10.00  45.89  1,297,378.84 
6018+120.00  2.30  4.59  10.00  45.89  1,297,332.95 
6018+140.00  2.30  4.59  10.00  45.90  1,297,287.05 
6018+160.00  2.30  4.59  10.00  45.90  1,297,241.15 
6018+180.00  2.29  4.59  10.00  45.89  1,297,195.26 
6018+200.00  2.29  4.59  10.00  45.88  1,297,149.38 
6018+220.00  2.30  4.59  10.00  45.89  1,297,103.49 
6018+240.00  2.30  4.59  10.00  45.90  1,297,057.59 
6018+250.00  2.30  4.59  5.00  22.95  1,297,034.64 
6018+250.00  2.30  4.59  0.00  0.00  1,297,034.64 
6018+260.00  2.30  4.59  5.00  22.95  1,297,011.69 
6018+280.00  2.29  4.59  10.00  45.89  1,296,965.80 
6018+300.00  2.30  4.59  10.00  45.89  1,296,919.91 
6018+320.00  2.30  4.59  10.00  45.90  1,296,874.01 
6018+340.00  2.30  4.59  10.00  45.90  1,296,828.11 
6018+360.00  2.29  4.59  10.00  45.89  1,296,782.22 
6018+380.00  2.30  4.59  10.00  45.89  1,296,736.33 
6018+400.00  2.30  4.59  10.00  45.90  1,296,690.43 
6018+420.00  2.29  4.59  10.00  45.89  1,296,644.54 
6018+440.00  2.29  4.59  10.00  45.88  1,296,598.66 
6018+460.00  2.29  4.59  10.00  45.88  1,296,552.78 
6018+480.00  2.29  4.59  10.00  45.88  1,296,506.90 
6018+500.00  2.29  4.59  10.00  45.88  1,296,461.02 
6018+520.00  2.30  4.59  10.00  45.89  1,296,415.13 
6018+540.00  2.30  4.59  10.00  45.90  1,296,369.23 
6018+560.00  2.30  4.59  10.00  45.90  1,296,323.33 
6018+580.00  2.29  4.59  10.00  45.89  1,296,277.44 
6018+600.00  2.30  4.59  10.00  45.89  1,296,231.55 
6018+620.00  2.29  4.59  10.00  45.89  1,296,185.66 
6018+640.00  2.30  4.59  10.00  45.89  1,296,139.77 
6018+660.00  2.30  4.59  10.00  45.90  1,296,093.87 
6018+680.00  2.29  4.59  10.00  45.89  1,296,047.98 
6018+700.00  2.29  4.59  10.00  45.88  1,296,002.10 

652 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6018+720.00  2.29  4.59  10.00  45.88  1,295,956.22 


6018+727.00  2.30  4.59  3.50  16.06  1,295,940.16 
6018+740.00  2.30  4.59  6.50  29.84  1,295,910.32 
6018+747.00  2.30  4.59  3.50  16.07  1,295,894.26 
6018+757.00  2.30  4.59  5.00  22.95  1,295,871.31 
6018+760.00  2.30  4.59  1.50  6.89  1,295,864.42 
6018+767.00  2.30  4.59  3.50  16.07  1,295,848.36 
6018+777.00  2.30  4.59  5.00  22.95  1,295,825.41 
6018+780.00  2.30  4.59  1.50  6.89  1,295,818.52 
6018+787.00  2.30  4.59  3.50  16.07  1,295,802.46 
6018+797.00  2.30  4.59  5.00  22.95  1,295,779.51 
6018+800.00  2.30  4.59  1.50  6.89  1,295,772.62 
6018+807.00  2.30  4.59  3.50  16.07  1,295,756.56 
6018+817.00  2.30  4.59  5.00  22.95  1,295,733.61 
6018+820.00  2.30  4.59  1.50  6.89  1,295,726.72 
6018+827.00  2.30  4.59  3.50  16.07  1,295,710.66 
6018+837.00  2.30  4.59  5.00  22.95  1,295,687.71 
6018+840.00  2.30  4.59  1.50  6.89  1,295,680.82 
6018+847.00  2.30  4.59  3.50  16.07  1,295,664.76 
6018+857.00  2.30  4.59  5.00  22.95  1,295,641.81 
6018+860.00  2.30  4.59  1.50  6.89  1,295,634.92 
6018+867.00  2.30  4.59  3.50  16.07  1,295,618.86 
6018+880.00  2.30  4.59  6.50  29.84  1,295,589.02 
6018+900.00  2.30  4.59  10.00  45.90  1,295,543.12 
6018+920.00  2.30  4.59  10.00  45.90  1,295,497.22 
6018+940.00  2.30  4.59  10.00  45.90  1,295,451.32 
6018+960.00  2.30  4.59  10.00  45.90  1,295,405.42 
6018+980.00  2.30  4.59  10.00  45.90  1,295,359.52 
6019+000.00  2.30  4.59  10.00  45.90  1,295,313.62 
6019+020.00  2.30  4.59  10.00  45.90  1,295,267.72 
6019+040.00  2.30  4.59  10.00  45.90  1,295,221.82 
6019+060.00  2.30  4.59  10.00  45.90  1,295,175.92 
6019+070.00  2.30  4.59  5.00  22.95  1,295,152.97 
6019+070.00  2.30  4.59  0.00  0.00  1,295,152.97 
6019+080.00  2.30  4.59  5.00  22.95  1,295,130.02 
6019+100.00  2.30  4.59  10.00  45.90  1,295,084.12 
6019+120.00  2.30  4.59  10.00  45.90  1,295,038.22 
6019+140.00  2.30  4.59  10.00  45.90  1,294,992.32 
6019+160.00  2.30  4.59  10.00  45.90  1,294,946.42 
6019+160.00  2.30  4.59  0.00  0.00  1,294,946.42 
6019+180.00  2.30  4.59  10.00  45.90  1,294,900.52 
6019+200.00  2.30  4.59  10.00  45.90  1,294,854.62 
6019+220.00  2.30  4.59  10.00  45.90  1,294,808.72 
6019+240.00  2.30  4.59  10.00  45.90  1,294,762.82 
6019+247.00  2.30  4.59  3.50  16.07  1,294,746.76 

653 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6019+257.00  2.30  4.59  5.00  22.95  1,294,723.81 


6019+260.00  2.30  4.59  1.50  6.89  1,294,716.92 
6019+267.00  2.30  4.59  3.50  16.07  1,294,700.86 
6019+277.00  2.30  4.59  5.00  22.95  1,294,677.91 
6019+280.00  2.30  4.59  1.50  6.89  1,294,671.02 
6019+287.00  2.30  4.59  3.50  16.07  1,294,654.96 
6019+297.00  2.30  4.59  5.00  22.95  1,294,632.01 
6019+300.00  2.30  4.59  1.50  6.89  1,294,625.12 
6019+307.00  2.30  4.59  3.50  16.07  1,294,609.06 
6019+317.00  2.30  4.59  5.00  22.95  1,294,586.11 
6019+320.00  2.30  4.59  1.50  6.89  1,294,579.22 
6019+327.00  2.30  4.59  3.50  16.07  1,294,563.16 
6019+337.00  2.30  4.59  5.00  22.95  1,294,540.21 
6019+340.00  2.30  4.59  1.50  6.89  1,294,533.32 
6019+347.00  2.30  4.59  3.50  16.07  1,294,517.26 
6019+357.00  2.30  4.59  5.00  22.95  1,294,494.31 
6019+360.00  2.30  4.59  1.50  6.89  1,294,487.42 
6019+366.83  2.30  4.59  3.42  15.68  1,294,471.74 
6019+380.00  2.32  4.62  6.58  30.38  1,294,441.36 
6019+386.83  2.29  4.61  3.42  15.76  1,294,425.59 
6019+400.00  2.29  4.59  6.58  30.21  1,294,395.39 
6019+420.00  2.29  4.59  10.00  45.88  1,294,349.51 
6019+440.00  2.29  4.59  10.00  45.88  1,294,303.63 
6019+460.00  2.29  4.59  10.00  45.88  1,294,257.75 
6019+480.00  2.29  4.59  10.00  45.88  1,294,211.87 
6019+500.00  2.29  4.59  10.00  45.88  1,294,165.99 
6019+520.00  2.29  4.59  10.00  45.88  1,294,120.11 
6019+540.00  2.29  4.59  10.00  45.88  1,294,074.23 
6019+560.00  2.29  4.59  10.00  45.88  1,294,028.35 
6019+570.00  2.29  4.59  5.00  22.94  1,294,005.41 
6019+580.00  2.32  4.61  5.00  23.05  1,293,982.36 
6019+590.00  2.30  4.61  5.00  23.05  1,293,959.31 
6019+600.00  2.30  4.59  5.00  22.95  1,293,936.36 
6019+610.00  2.30  4.59  5.00  22.95  1,293,913.41 
6019+620.00  2.30  4.59  5.00  22.95  1,293,890.46 
6019+630.00  2.30  4.59  5.00  22.95  1,293,867.51 
6019+640.00  2.30  4.59  5.00  22.95  1,293,844.56 
6019+650.00  2.30  4.59  5.00  22.95  1,293,821.61 
6019+660.00  2.30  4.59  5.00  22.95  1,293,798.66 
6019+670.00  2.30  4.59  5.00  22.95  1,293,775.71 
6019+680.00  2.30  4.59  5.00  22.95  1,293,752.76 
6019+690.00  2.30  4.59  5.00  22.95  1,293,729.81 
6019+700.00  2.30  4.59  5.00  22.95  1,293,706.86 
6019+710.00  2.30  4.59  5.00  22.95  1,293,683.91 
6019+720.00  2.30  4.59  5.00  22.95  1,293,660.96 

654 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6019+730.00  2.30  4.59  5.00  22.95  1,293,638.01 


6019+740.00  2.30  4.59  5.00  22.95  1,293,615.06 
6019+750.00  2.30  4.59  5.00  22.95  1,293,592.11 
6019+760.00  2.30  4.59  5.00  22.95  1,293,569.16 
6019+770.00  2.30  4.59  5.00  22.95  1,293,546.21 
6019+780.00  2.30  4.59  5.00  22.95  1,293,523.26 
6019+800.00  2.30  4.59  10.00  45.90  1,293,477.36 
6019+820.00  2.30  4.59  10.00  45.90  1,293,431.46 
6019+840.00  2.30  4.59  10.00  45.90  1,293,385.56 
6019+860.00  2.30  4.59  10.00  45.90  1,293,339.66 
6019+880.00  2.30  4.59  10.00  45.90  1,293,293.76 
6019+900.00  2.30  4.59  10.00  45.90  1,293,247.86 
6019+920.00  2.30  4.59  10.00  45.90  1,293,201.96 
6019+940.00  2.30  4.59  10.00  45.90  1,293,156.06 
6019+960.00  2.30  4.59  10.00  45.90  1,293,110.16 
6019+980.00  2.30  4.59  10.00  45.90  1,293,064.26 
6020+000.00  2.30  4.59  10.00  45.90  1,293,018.36 
6020+020.00  2.30  4.59  10.00  45.90  1,292,972.46 
6020+040.00  2.30  4.59  10.00  45.90  1,292,926.56 
6020+060.00  2.30  4.59  10.00  45.90  1,292,880.66 
6020+080.00  2.30  4.59  10.00  45.90  1,292,834.76 
6020+100.00  2.30  4.59  10.00  45.90  1,292,788.86 
6020+120.00  2.30  4.59  10.00  45.90  1,292,742.96 
6020+140.00  2.30  4.59  10.00  45.90  1,292,697.06 
6020+160.00  2.30  4.59  10.00  45.90  1,292,651.16 
6020+180.00  2.30  4.59  10.00  45.90  1,292,605.26 
6020+200.00  2.30  4.59  10.00  45.90  1,292,559.36 
6020+220.00  2.30  4.59  10.00  45.90  1,292,513.46 
6020+240.00  2.30  4.59  10.00  45.90  1,292,467.56 
6020+260.00  2.30  4.59  10.00  45.90  1,292,421.66 
6020+280.00  2.30  4.59  10.00  45.90  1,292,375.76 
6020+300.00  2.30  4.59  10.00  45.90  1,292,329.86 
6020+320.00  2.30  4.59  10.00  45.90  1,292,283.96 
6020+340.00  2.30  4.59  10.00  45.90  1,292,238.06 
6020+360.00  2.30  4.59  10.00  45.90  1,292,192.16 
6020+380.00  2.30  4.59  10.00  45.90  1,292,146.26 
6020+400.00  2.30  4.59  10.00  45.90  1,292,100.36 
6020+420.00  2.30  4.59  10.00  45.90  1,292,054.46 
6020+440.00  2.30  4.59  10.00  45.90  1,292,008.56 
6020+460.00  2.30  4.59  10.00  45.90  1,291,962.66 
6020+480.00  2.30  4.59  10.00  45.90  1,291,916.76 
6020+500.00  2.30  4.59  10.00  45.90  1,291,870.86 
6020+520.00  2.30  4.59  10.00  45.90  1,291,824.96 
6020+540.00  2.30  4.59  10.00  45.90  1,291,779.06 
6020+560.00  2.30  4.59  10.00  45.90  1,291,733.16 

655 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6020+580.00  2.30  4.59  10.00  45.90  1,291,687.26 


6020+600.00  2.30  4.59  10.00  45.90  1,291,641.36 
6020+620.00  2.30  4.59  10.00  45.90  1,291,595.46 
6020+640.00  2.30  4.59  10.00  45.90  1,291,549.56 
6020+660.00  2.30  4.59  10.00  45.90  1,291,503.66 
6020+680.00  2.30  4.59  10.00  45.90  1,291,457.76 
6020+700.00  2.30  4.59  10.00  45.90  1,291,411.86 
6020+720.00  2.30  4.59  10.00  45.90  1,291,365.96 
6020+740.00  2.30  4.59  10.00  45.90  1,291,320.06 
6020+760.00  2.30  4.59  10.00  45.90  1,291,274.16 
6020+780.00  2.30  4.59  10.00  45.90  1,291,228.26 
6020+800.00  2.30  4.59  10.00  45.90  1,291,182.36 
6020+820.00  2.30  4.59  10.00  45.90  1,291,136.46 
6020+840.00  2.30  4.59  10.00  45.90  1,291,090.56 
6020+860.00  2.30  4.59  10.00  45.90  1,291,044.66 
6020+880.00  2.30  4.59  10.00  45.90  1,290,998.76 
6020+880.00  2.30  4.59  0.00  0.00  1,290,998.76 
6020+900.00  2.30  4.59  10.00  45.90  1,290,952.86 
6020+920.00  2.30  4.59  10.00  45.90  1,290,906.96 
6020+940.00  2.30  4.59  10.00  45.90  1,290,861.06 
6020+960.00  2.30  4.59  10.00  45.90  1,290,815.16 
6020+980.00  2.30  4.59  10.00  45.90  1,290,769.26 
6021+000.00  2.30  4.59  10.00  45.90  1,290,723.36 
6021+020.00  2.30  4.59  10.00  45.90  1,290,677.46 
6021+040.00  2.30  4.59  10.00  45.90  1,290,631.56 
6021+060.00  2.30  4.59  10.00  45.90  1,290,585.66 
6021+080.00  2.30  4.59  10.00  45.90  1,290,539.76 
6021+100.00  2.30  4.59  10.00  45.90  1,290,493.86 
6021+120.00  2.30  4.59  10.00  45.90  1,290,447.96 
6021+140.00  2.30  4.59  10.00  45.90  1,290,402.06 
6021+160.00  2.30  4.59  10.00  45.90  1,290,356.16 
6021+180.00  2.30  4.59  10.00  45.90  1,290,310.26 
6021+200.00  2.30  4.59  10.00  45.90  1,290,264.36 
6021+220.00  2.30  4.59  10.00  45.90  1,290,218.46 
6021+240.00  2.30  4.59  10.00  45.90  1,290,172.56 
6021+250.00  2.30  4.59  5.00  22.95  1,290,149.61 
6021+260.00  2.30  4.59  5.00  22.95  1,290,126.66 
6021+270.00  2.30  4.59  5.00  22.95  1,290,103.71 
6021+280.00  2.30  4.59  5.00  22.95  1,290,080.76 
6021+290.00  2.30  4.59  5.00  22.95  1,290,057.81 
6021+300.00  2.30  4.59  5.00  22.95  1,290,034.86 
6021+310.00  2.30  4.59  5.00  22.95  1,290,011.91 
6021+320.00  2.30  4.59  5.00  22.95  1,289,988.96 
6021+330.00  2.30  4.59  5.00  22.95  1,289,966.01 
6021+340.00  2.30  4.59  5.00  22.95  1,289,943.06 

656 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6021+350.00  2.30  4.59  5.00  22.95  1,289,920.11 


6021+360.00  2.30  4.59  5.00  22.95  1,289,897.16 
6021+370.00  2.30  4.59  5.00  22.95  1,289,874.21 
6021+380.00  2.30  4.59  5.00  22.95  1,289,851.26 
6021+390.00  2.30  4.59  5.00  22.95  1,289,828.31 
6021+400.00  2.30  4.59  5.00  22.95  1,289,805.36 
6021+409.97  2.30  4.59  4.99  22.88  1,289,782.48 
6021+420.00  2.32  4.61  5.01  23.12  1,289,759.36 
6021+429.97  2.29  4.61  4.99  22.98  1,289,736.37 
6021+440.00  2.29  4.59  5.01  23.01  1,289,713.37 
6021+455.00  2.29  4.59  7.50  34.41  1,289,678.96 
6021+455.00  2.29  4.59  0.00  0.00  1,289,678.96 
6021+460.00  2.29  4.59  2.50  11.47  1,289,667.49 
6021+480.00  2.29  4.59  10.00  45.88  1,289,621.61 
6021+500.00  2.29  4.59  10.00  45.88  1,289,575.73 
6021+520.00  2.29  4.59  10.00  45.88  1,289,529.85 
6021+540.00  2.29  4.59  10.00  45.88  1,289,483.97 
6021+560.00  2.29  4.59  10.00  45.88  1,289,438.09 
6021+580.00  2.29  4.59  10.00  45.88  1,289,392.21 
6021+600.00  2.29  4.59  10.00  45.88  1,289,346.33 
6021+620.00  2.29  4.59  10.00  45.88  1,289,300.45 
6021+640.00  2.29  4.59  10.00  45.88  1,289,254.57 
6021+660.00  2.29  4.59  10.00  45.88  1,289,208.69 
6021+680.00  2.29  4.59  10.00  45.88  1,289,162.81 
6021+700.00  2.29  4.59  10.00  45.88  1,289,116.93 
6021+702.74  2.29  4.59  1.37  6.29  1,289,110.64 
6021+720.00  2.26  4.56  8.63  39.32  1,289,071.32 
6021+740.00  2.23  4.49  10.00  44.90  1,289,026.42 
6021+760.00  2.19  4.42  10.00  44.19  1,288,982.23 
6021+775.00  2.19  4.38  7.50  32.87  1,288,949.35 
6021+775.00  2.19  4.38  0.00  0.00  1,288,949.35 
6021+780.00  2.20  4.39  2.50  10.98  1,288,938.38 
6021+800.00  2.23  4.43  10.00  44.31  1,288,894.07 
6021+820.00  2.27  4.50  10.00  44.98  1,288,849.09 
6021+840.00  2.30  4.57  10.00  45.66  1,288,803.43 
6021+852.74  2.32  4.62  6.37  29.45  1,288,773.98 
6021+860.00  2.32  4.64  3.63  16.85  1,288,757.13 
6021+880.00  2.32  4.64  10.00  46.44  1,288,710.69 
6021+900.00  2.32  4.64  10.00  46.44  1,288,664.25 
6021+920.00  2.32  4.64  10.00  46.44  1,288,617.81 
6021+940.00  2.32  4.64  10.00  46.44  1,288,571.37 
6021+960.00  2.32  4.64  10.00  46.44  1,288,524.93 
6021+980.00  2.32  4.64  10.00  46.44  1,288,478.49 
6022+000.00  2.32  4.64  10.00  46.44  1,288,432.05 
6022+020.00  2.32  4.64  10.00  46.44  1,288,385.61 

657 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6022+040.00  2.32  4.64  10.00  46.44  1,288,339.17 


6022+060.00  2.32  4.64  10.00  46.44  1,288,292.73 
6022+080.00  2.32  4.64  10.00  46.44  1,288,246.29 
6022+095.00  2.32  4.64  7.50  34.83  1,288,211.46 
6022+095.00  2.32  4.64  0.00  0.00  1,288,211.46 
6022+100.00  2.32  4.64  2.50  11.61  1,288,199.85 
6022+100.00  2.32  4.64  0.00  0.00  1,288,199.85 
6022+120.00  2.32  4.64  10.00  46.44  1,288,153.41 
6022+140.00  2.32  4.64  10.00  46.44  1,288,106.97 
6022+160.00  2.32  4.64  10.00  46.44  1,288,060.53 
6022+170.00  2.32  4.64  5.00  23.22  1,288,037.31 
6022+170.00  2.32  4.64  0.00  0.00  1,288,037.31 
6022+180.00  2.32  4.64  5.00  23.22  1,288,014.09 
6022+200.00  2.32  4.64  10.00  46.44  1,287,967.65 
6022+220.00  2.32  4.64  10.00  46.44  1,287,921.21 
6022+240.00  2.32  4.64  10.00  46.44  1,287,874.77 
6022+260.00  2.32  4.64  10.00  46.44  1,287,828.33 
6022+280.00  2.32  4.64  10.00  46.44  1,287,781.89 
6022+300.00  2.32  4.64  10.00  46.44  1,287,735.45 
6022+320.00  2.32  4.64  10.00  46.44  1,287,689.01 
6022+340.00  2.32  4.64  10.00  46.44  1,287,642.57 
6022+360.00  2.32  4.64  10.00  46.44  1,287,596.13 
6022+380.00  2.32  4.64  10.00  46.44  1,287,549.69 
6022+400.00  2.32  4.64  10.00  46.44  1,287,503.25 
6022+420.00  2.32  4.64  10.00  46.44  1,287,456.81 
6022+440.00  2.32  4.64  10.00  46.44  1,287,410.37 
6022+460.00  2.32  4.64  10.00  46.44  1,287,363.93 
6022+480.00  2.32  4.64  10.00  46.44  1,287,317.49 
6022+500.00  2.32  4.64  10.00  46.44  1,287,271.05 
6022+520.00  2.32  4.64  10.00  46.44  1,287,224.61 
6022+540.00  2.32  4.64  10.00  46.44  1,287,178.17 
6022+560.00  2.32  4.64  10.00  46.44  1,287,131.73 
6022+580.00  2.32  4.64  10.00  46.44  1,287,085.29 
6022+600.00  2.32  4.64  10.00  46.44  1,287,038.85 
6022+620.00  2.32  4.64  10.00  46.44  1,286,992.41 
6022+640.00  2.32  4.64  10.00  46.44  1,286,945.97 
6022+660.00  2.32  4.64  10.00  46.44  1,286,899.53 
6022+680.00  2.32  4.64  10.00  46.44  1,286,853.09 
6022+700.00  2.32  4.64  10.00  46.44  1,286,806.65 
6022+720.00  2.32  4.64  10.00  46.44  1,286,760.21 
6022+740.00  2.32  4.64  10.00  46.44  1,286,713.77 
6022+760.00  2.32  4.64  10.00  46.44  1,286,667.33 
6022+780.00  2.32  4.64  10.00  46.44  1,286,620.89 
6022+800.00  2.32  4.64  10.00  46.44  1,286,574.45 
6022+820.00  2.32  4.64  10.00  46.44  1,286,528.01 

658 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6022+840.00  2.32  4.64  10.00  46.44  1,286,481.57 


6022+860.00  2.32  4.64  10.00  46.44  1,286,435.13 
6022+880.00  2.32  4.64  10.00  46.44  1,286,388.69 
6022+900.00  2.32  4.64  10.00  46.44  1,286,342.25 
6022+920.00  2.32  4.64  10.00  46.44  1,286,295.81 
6022+940.00  2.32  4.64  10.00  46.44  1,286,249.37 
6022+960.00  2.32  4.64  10.00  46.44  1,286,202.93 
6022+980.00  2.32  4.64  10.00  46.44  1,286,156.49 
6023+000.00  2.32  4.64  10.00  46.44  1,286,110.05 
6023+020.00  2.32  4.64  10.00  46.44  1,286,063.61 
6023+040.00  2.32  4.64  10.00  46.44  1,286,017.17 
6023+060.00  2.32  4.64  10.00  46.44  1,285,970.73 
6023+080.00  2.32  4.64  10.00  46.44  1,285,924.29 
6023+100.00  2.32  4.64  10.00  46.44  1,285,877.85 
6023+120.00  2.32  4.64  10.00  46.44  1,285,831.41 
6023+140.00  2.32  4.64  10.00  46.44  1,285,784.97 
6023+160.00  2.32  4.64  10.00  46.44  1,285,738.53 
6023+180.00  2.32  4.64  10.00  46.44  1,285,692.09 
6023+200.00  2.32  4.64  10.00  46.44  1,285,645.65 
6023+220.00  2.32  4.64  10.00  46.44  1,285,599.21 
6023+240.00  2.32  4.64  10.00  46.44  1,285,552.77 
6023+260.00  2.32  4.64  10.00  46.44  1,285,506.33 
6023+280.00  2.32  4.64  10.00  46.44  1,285,459.89 
6023+300.00  2.32  4.64  10.00  46.44  1,285,413.45 
6023+320.00  2.32  4.64  10.00  46.44  1,285,367.01 
6023+340.00  2.32  4.64  10.00  46.44  1,285,320.57 
6023+360.00  2.32  4.64  10.00  46.44  1,285,274.13 
6023+380.00  2.32  4.64  10.00  46.44  1,285,227.69 
6023+400.00  2.32  4.64  10.00  46.44  1,285,181.25 
6023+420.00  2.32  4.64  10.00  46.44  1,285,134.81 
6023+440.00  2.32  4.64  10.00  46.44  1,285,088.37 
6023+460.00  2.32  4.64  10.00  46.44  1,285,041.93 
6023+480.00  2.32  4.64  10.00  46.44  1,284,995.49 
6023+500.00  2.32  4.64  10.00  46.44  1,284,949.05 
6023+520.00  2.32  4.64  10.00  46.44  1,284,902.61 
6023+540.00  2.32  4.64  10.00  46.44  1,284,856.17 
6023+560.00  2.32  4.64  10.00  46.44  1,284,809.73 
6023+580.00  2.32  4.64  10.00  46.44  1,284,763.29 
6023+600.00  2.32  4.64  10.00  46.44  1,284,716.85 
6023+620.00  2.32  4.64  10.00  46.44  1,284,670.41 
6023+640.00  2.32  4.64  10.00  46.44  1,284,623.97 
6023+660.00  2.32  4.64  10.00  46.44  1,284,577.53 
6023+680.00  2.32  4.64  10.00  46.44  1,284,531.09 
6023+700.00  2.32  4.64  10.00  46.44  1,284,484.65 
6023+720.00  2.32  4.64  10.00  46.44  1,284,438.21 

659 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6023+740.00  2.32  4.64  10.00  46.44  1,284,391.77 


6023+760.00  2.32  4.64  10.00  46.44  1,284,345.33 
6023+780.00  2.32  4.64  10.00  46.44  1,284,298.89 
6023+800.00  2.32  4.64  10.00  46.44  1,284,252.45 
6023+820.00  2.32  4.64  10.00  46.44  1,284,206.01 
6023+840.00  2.32  4.64  10.00  46.44  1,284,159.57 
6023+860.00  2.32  4.64  10.00  46.44  1,284,113.13 
6023+880.00  2.32  4.64  10.00  46.44  1,284,066.69 
6023+880.00  2.32  4.64  0.00  0.00  1,284,066.69 
6023+900.00  2.32  4.64  10.00  46.44  1,284,020.25 
6023+920.00  2.32  4.64  10.00  46.44  1,283,973.81 
6023+940.00  2.32  4.64  10.00  46.44  1,283,927.37 
6023+960.00  2.32  4.64  10.00  46.44  1,283,880.93 
6023+980.00  2.32  4.64  10.00  46.44  1,283,834.49 
6024+000.00  2.32  4.64  10.00  46.44  1,283,788.05 
6024+020.00  2.32  4.64  10.00  46.44  1,283,741.61 
6024+040.00  2.32  4.64  10.00  46.44  1,283,695.17 
6024+049.07  2.32  4.64  4.54  21.06  1,283,674.11 
6024+060.00  2.30  4.63  5.46  25.28  1,283,648.83 
6024+080.00  2.27  4.57  10.00  45.73  1,283,603.10 
6024+100.00  2.24  4.50  10.00  45.04  1,283,558.06 
6024+120.00  2.20  4.44  10.00  44.37  1,283,513.69 
6024+140.00  2.19  4.39  10.00  43.91  1,283,469.78 
6024+160.00  2.22  4.41  10.00  44.13  1,283,425.65 
6024+180.00  2.26  4.48  10.00  44.84  1,283,380.81 
6024+199.07  2.29  4.55  9.54  43.42  1,283,337.38 
6024+200.00  2.29  4.59  0.46  2.13  1,283,335.25 
6024+220.00  2.29  4.59  10.00  45.88  1,283,289.37 
6024+240.00  2.29  4.59  10.00  45.88  1,283,243.49 
6024+260.00  2.29  4.59  10.00  45.88  1,283,197.61 
6024+270.00  2.29  4.59  5.00  22.94  1,283,174.67 
6024+270.00  2.29  4.59  0.00  0.00  1,283,174.67 
6024+280.00  2.29  4.59  5.00  22.94  1,283,151.73 
6024+300.00  2.29  4.59  10.00  45.88  1,283,105.85 
6024+316.48  2.29  4.59  8.24  37.81  1,283,068.04 
6024+320.00  2.29  4.59  1.76  8.07  1,283,059.97 
6024+340.00  2.29  4.59  10.00  45.88  1,283,014.09 
6024+360.00  2.29  4.59  10.00  45.88  1,282,968.21 
6024+376.40  2.29  4.59  8.20  37.62  1,282,930.59 
6024+376.40  4.59  4.59        1,300,000.00 
6024+380.00  4.59  9.18  1.80  16.52  1,299,983.48 
6024+400.00  4.59  9.18  10.00  91.82  1,299,891.66 
6024+420.00  4.59  9.18  10.00  91.82  1,299,799.84 
6024+440.00  4.59  9.18  10.00  91.82  1,299,708.02 
6024+460.00  4.59  9.18  10.00  91.82  1,299,616.20 

660 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6024+480.00  4.59  9.18  10.00  91.82  1,299,524.38 


6024+500.00  4.59  9.18  10.00  91.82  1,299,432.56 
6024+520.00  4.59  9.18  10.00  91.82  1,299,340.74 
6024+540.00  4.59  9.18  10.00  91.82  1,299,248.92 
6024+560.00  4.59  9.18  10.00  91.82  1,299,157.10 
6024+580.00  4.59  9.18  10.00  91.82  1,299,065.28 
6024+600.00  4.59  9.18  10.00  91.82  1,298,973.46 
6024+620.00  4.59  9.18  10.00  91.82  1,298,881.64 
6024+640.00  4.59  9.18  10.00  91.82  1,298,789.82 
6024+660.00  4.59  9.18  10.00  91.82  1,298,698.00 
6024+680.00  4.59  9.18  10.00  91.82  1,298,606.18 
6024+700.00  4.59  9.18  10.00  91.82  1,298,514.36 
6024+720.00  4.59  9.18  10.00  91.82  1,298,422.54 
6024+740.00  4.59  9.18  10.00  91.82  1,298,330.72 
6024+760.00  4.59  9.18  10.00  91.82  1,298,238.90 
6024+780.00  4.59  9.18  10.00  91.82  1,298,147.08 
6024+800.00  4.59  9.18  10.00  91.81  1,298,055.27 
6024+820.00  4.59  9.18  10.00  91.80  1,297,963.47 
6024+840.00  4.59  9.18  10.00  91.81  1,297,871.66 
6024+860.00  4.59  9.18  10.00  91.81  1,297,779.85 
6024+880.00  4.59  9.18  10.00  91.81  1,297,688.04 
6024+900.00  4.59  9.18  10.00  91.82  1,297,596.22 
6024+920.00  4.59  9.18  10.00  91.82  1,297,504.40 
6024+940.00  4.59  9.18  10.00  91.82  1,297,412.58 
6024+960.00  4.59  9.18  10.00  91.82  1,297,320.76 
6024+980.00  4.59  9.18  10.00  91.82  1,297,228.94 
6025+000.00  4.59  9.18  10.00  91.81  1,297,137.13 
6025+020.00  4.59  9.18  10.00  91.81  1,297,045.32 
6025+040.00  4.59  9.18  10.00  91.82  1,296,953.50 
6025+060.00  4.59  9.18  10.00  91.81  1,296,861.69 
6025+080.00  4.59  9.18  10.00  91.81  1,296,769.88 
6025+100.00  4.59  9.18  10.00  91.82  1,296,678.06 
6025+120.00  4.59  9.18  10.00  91.81  1,296,586.25 
6025+140.00  4.59  9.18  10.00  91.81  1,296,494.44 
6025+160.00  4.59  9.18  10.00  91.82  1,296,402.62 
6025+180.00  4.59  9.18  10.00  91.81  1,296,310.81 
6025+200.00  4.59  9.18  10.00  91.81  1,296,219.00 
6025+220.00  4.59  9.18  10.00  91.82  1,296,127.18 
6025+240.00  4.59  9.18  10.00  91.82  1,296,035.36 
6025+260.00  4.59  9.18  10.00  91.82  1,295,943.54 
6025+280.00  4.59  9.18  10.00  91.82  1,295,851.72 
6025+300.00  4.59  9.18  10.00  91.82  1,295,759.90 
6025+320.00  4.59  9.18  10.00  91.82  1,295,668.08 
6025+340.00  4.59  9.18  10.00  91.82  1,295,576.26 
6025+360.00  4.59  9.18  10.00  91.82  1,295,484.44 

661 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6025+380.00  4.59  9.18  10.00  91.82  1,295,392.62 


6025+400.00  4.59  9.18  10.00  91.82  1,295,300.80 
6025+420.00  4.59  9.18  10.00  91.82  1,295,208.98 
6025+440.00  4.59  9.18  10.00  91.82  1,295,117.16 
6025+460.00  4.59  9.18  10.00  91.82  1,295,025.34 
6025+480.00  4.59  9.18  10.00  91.82  1,294,933.52 
6025+500.00  4.59  9.18  10.00  91.82  1,294,841.70 
6025+520.00  4.59  9.18  10.00  91.82  1,294,749.88 
6025+540.00  4.59  9.18  10.00  91.82  1,294,658.06 
6025+560.00  4.59  9.18  10.00  91.82  1,294,566.24 
6025+580.00  4.59  9.18  10.00  91.82  1,294,474.42 
6025+580.00  4.59  9.18  0.00  0.00  1,294,474.42 
6025+600.00  4.59  9.18  10.00  91.82  1,294,382.60 
6025+620.00  4.59  9.18  10.00  91.82  1,294,290.78 
6025+640.00  4.59  9.18  10.00  91.82  1,294,198.96 
6025+660.00  4.59  9.18  10.00  91.82  1,294,107.14 
6025+660.00  4.59  9.18  0.00  0.00  1,294,107.14 
6025+680.00  4.59  9.18  10.00  91.82  1,294,015.32 
6025+700.00  4.59  9.18  10.00  91.82  1,293,923.50 
6025+720.00  4.59  9.18  10.00  91.82  1,293,831.68 
6025+740.00  4.59  9.18  10.00  91.82  1,293,739.86 
6025+760.00  4.59  9.18  10.00  91.82  1,293,648.04 
6025+780.00  4.59  9.18  10.00  91.82  1,293,556.22 
6025+800.00  4.59  9.18  10.00  91.82  1,293,464.40 
6025+820.00  4.59  9.18  10.00  91.82  1,293,372.58 
6025+840.00  4.59  9.18  10.00  91.82  1,293,280.76 
6025+860.00  4.59  9.18  10.00  91.82  1,293,188.94 
6025+880.00  4.59  9.18  10.00  91.82  1,293,097.12 
6025+900.00  4.59  9.18  10.00  91.82  1,293,005.30 
6025+920.00  4.59  9.18  10.00  91.82  1,292,913.48 
6025+940.00  4.59  9.18  10.00  91.82  1,292,821.66 
6025+960.00  4.59  9.18  10.00  91.82  1,292,729.84 
6025+980.00  4.59  9.18  10.00  91.82  1,292,638.02 
6026+000.00  4.59  9.18  10.00  91.81  1,292,546.21 
6026+020.00  4.59  9.18  10.00  91.81  1,292,454.40 
6026+040.00  4.59  9.18  10.00  91.82  1,292,362.58 
6026+060.00  4.59  9.18  10.00  91.81  1,292,270.77 
6026+080.00  4.59  9.18  10.00  91.81  1,292,178.96 
6026+100.00  4.59  9.18  10.00  91.81  1,292,087.15 
6026+120.00  4.59  9.18  10.00  91.81  1,291,995.34 
6026+140.00  4.59  9.18  10.00  91.81  1,291,903.53 
6026+160.00  4.59  9.18  10.00  91.80  1,291,811.73 
6026+180.00  4.59  9.18  10.00  91.81  1,291,719.92 
6026+200.00  4.59  9.18  10.00  91.82  1,291,628.10 
6026+220.00  4.59  9.18  10.00  91.82  1,291,536.28 

662 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6026+240.00  4.59  9.18  10.00  91.82  1,291,444.46 


6026+260.00  4.59  9.18  10.00  91.82  1,291,352.64 
6026+280.00  4.59  9.18  10.00  91.82  1,291,260.82 
6026+290.99  4.59  9.18  5.49  50.45  1,291,210.37 
6026+300.00  4.59  9.18  4.51  41.37  1,291,169.00 
6026+320.00  4.59  9.18  10.00  91.81  1,291,077.19 
6026+320.99  4.59  9.18  0.49  4.54  1,291,072.65 
6026+340.00  4.59  9.18  9.51  87.28  1,290,985.37 
6026+360.00  4.59  9.18  10.00  91.82  1,290,893.55 
6026+380.00  4.59  9.18  10.00  91.82  1,290,801.73 
6026+400.00  4.59  9.18  10.00  91.82  1,290,709.91 
6026+407.71  4.59  9.18  3.85  35.39  1,290,674.52 
6026+420.00  4.59  9.18  6.15  56.43  1,290,618.09 
6026+437.71  4.59  9.18  8.85  81.29  1,290,536.81 
6026+440.00  4.59  9.18  1.15  10.52  1,290,526.28 
6026+460.00  4.59  9.18  10.00  91.81  1,290,434.47 
6026+480.00  4.59  9.18  10.00  91.81  1,290,342.66 
6026+500.00  4.59  9.18  10.00  91.82  1,290,250.84 
6026+520.00  4.59  9.18  10.00  91.82  1,290,159.02 
6026+540.00  4.59  9.18  10.00  91.82  1,290,067.20 
6026+560.00  4.59  9.18  10.00  91.82  1,289,975.38 
6026+580.00  4.59  9.18  10.00  91.82  1,289,883.56 
6026+600.00  4.59  9.18  10.00  91.82  1,289,791.74 
6026+620.00  4.59  9.18  10.00  91.82  1,289,699.92 
6026+640.00  4.59  9.18  10.00  91.82  1,289,608.10 
6026+660.00  4.59  9.18  10.00  91.82  1,289,516.28 
6026+680.00  4.59  9.18  10.00  91.82  1,289,424.46 
6026+700.00  4.59  9.18  10.00  91.82  1,289,332.64 
6026+720.00  4.59  9.18  10.00  91.82  1,289,240.82 
6026+740.00  4.59  9.18  10.00  91.82  1,289,149.00 
6026+760.00  4.59  9.18  10.00  91.82  1,289,057.18 
6026+780.00  4.59  9.18  10.00  91.82  1,288,965.36 
6026+800.00  4.59  9.18  10.00  91.82  1,288,873.54 
6026+820.00  4.59  9.18  10.00  91.82  1,288,781.72 
6026+840.00  4.59  9.18  10.00  91.82  1,288,689.90 
6026+860.00  4.59  9.18  10.00  91.82  1,288,598.08 
6026+880.00  4.59  9.18  10.00  91.82  1,288,506.26 
6026+900.00  4.59  9.18  10.00  91.82  1,288,414.44 
6026+920.00  4.59  9.18  10.00  91.82  1,288,322.62 
6026+940.00  4.59  9.18  10.00  91.82  1,288,230.80 
6026+960.00  4.59  9.18  10.00  91.82  1,288,138.98 
6026+980.00  4.59  9.18  10.00  91.82  1,288,047.16 
6027+000.00  4.59  9.18  10.00  91.82  1,287,955.34 
6027+020.00  4.59  9.18  10.00  91.82  1,287,863.52 
6027+040.00  4.59  9.18  10.00  91.82  1,287,771.70 

663 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6027+060.00  4.59  9.18  10.00  91.82  1,287,679.88 


6027+080.00  4.59  9.18  10.00  91.82  1,287,588.06 
6027+100.00  4.59  9.18  10.00  91.82  1,287,496.24 
6027+120.00  4.59  9.18  10.00  91.82  1,287,404.42 
6027+140.00  4.59  9.18  10.00  91.82  1,287,312.60 
6027+160.00  4.59  9.18  10.00  91.82  1,287,220.78 
6027+180.00  4.59  9.18  10.00  91.82  1,287,128.96 
6027+200.00  4.59  9.18  10.00  91.82  1,287,037.14 
6027+220.00  4.59  9.18  10.00  91.82  1,286,945.32 
6027+240.00  4.59  9.18  10.00  91.82  1,286,853.50 
6027+260.00  4.59  9.18  10.00  91.82  1,286,761.68 
6027+280.00  4.59  9.18  10.00  91.82  1,286,669.86 
6027+300.00  4.59  9.18  10.00  91.82  1,286,578.04 
6027+320.00  4.59  9.18  10.00  91.82  1,286,486.22 
6027+340.00  4.59  9.18  10.00  91.82  1,286,394.40 
6027+360.00  4.59  9.18  10.00  91.82  1,286,302.58 
6027+380.00  4.59  9.18  10.00  91.82  1,286,210.76 
6027+400.00  4.59  9.18  10.00  91.82  1,286,118.94 
6027+420.00  4.59  9.18  10.00  91.82  1,286,027.12 
6027+440.00  4.59  9.18  10.00  91.82  1,285,935.30 
6027+460.00  4.59  9.18  10.00  91.82  1,285,843.48 
6027+480.00  4.59  9.18  10.00  91.82  1,285,751.66 
6027+500.00  4.59  9.18  10.00  91.82  1,285,659.84 
6027+520.00  4.59  9.18  10.00  91.82  1,285,568.02 
6027+540.00  4.59  9.18  10.00  91.82  1,285,476.20 
6027+560.00  4.59  9.18  10.00  91.81  1,285,384.39 
6027+565.00  4.59  9.18  2.50  22.95  1,285,361.44 
6027+565.00  4.59  9.18  0.00  0.00  1,285,361.44 
6027+580.00  4.59  9.18  7.50  68.87  1,285,292.57 
6027+600.00  4.59  9.18  10.00  91.82  1,285,200.75 
6027+620.00  4.59  9.18  10.00  91.81  1,285,108.94 
6027+640.00  4.59  9.18  10.00  91.81  1,285,017.13 
6027+660.00  4.59  9.18  10.00  91.82  1,284,925.31 
6027+680.00  4.59  9.18  10.00  91.82  1,284,833.49 
6027+700.00  4.59  9.18  10.00  91.81  1,284,741.68 
6027+720.00  4.59  9.18  10.00  91.81  1,284,649.87 
6027+740.00  4.59  9.18  10.00  91.82  1,284,558.05 
6027+760.00  4.59  9.18  10.00  91.81  1,284,466.24 
6027+780.00  4.59  9.18  10.00  91.81  1,284,374.43 
6027+800.00  4.59  9.18  10.00  91.82  1,284,282.61 
6027+820.00  4.59  9.18  10.00  91.81  1,284,190.80 
6027+840.00  4.59  9.18  10.00  91.81  1,284,098.99 
6027+860.00  4.59  9.18  10.00  91.82  1,284,007.17 
6027+880.00  4.59  9.18  10.00  91.81  1,283,915.36 
6027+900.00  4.59  9.18  10.00  91.81  1,283,823.55 

664 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6027+920.00  4.59  9.18  10.00  91.82  1,283,731.73 


6027+940.00  4.59  9.18  10.00  91.82  1,283,639.91 
6027+960.00  4.59  9.18  10.00  91.81  1,283,548.10 
6027+980.00  4.59  9.18  10.00  91.80  1,283,456.30 
6027+990.00  4.59  9.18  5.00  45.91  1,283,410.40 
6027+990.00  4.59  9.18  0.00  0.00  1,283,410.40 
6028+000.00  4.59  9.18  5.00  45.91  1,283,364.49 
6028+000.00  4.59  9.18  0.00  0.00  1,283,364.49 
6028+020.00  4.59  9.18  10.00  91.82  1,283,272.67 
6028+040.00  4.59  9.18  10.00  91.82  1,283,180.85 
6028+060.00  4.59  9.18  10.00  91.82  1,283,089.03 
6028+080.00  4.59  9.18  10.00  91.82  1,282,997.21 
6028+100.00  4.59  9.18  10.00  91.82  1,282,905.39 
6028+120.00  4.59  9.18  10.00  91.82  1,282,813.57 
6028+140.00  4.59  9.18  10.00  91.82  1,282,721.75 
6028+140.00  4.59  9.18  0.00  0.00  1,282,721.75 
6028+160.00  4.59  9.18  10.00  91.82  1,282,629.93 
6028+180.00  4.59  9.18  10.00  91.82  1,282,538.11 
6028+200.00  4.59  9.18  10.00  91.82  1,282,446.29 
6028+220.00  4.59  9.18  10.00  91.82  1,282,354.47 
6028+240.00  4.59  9.18  10.00  91.82  1,282,262.65 
6028+260.00  4.59  9.18  10.00  91.82  1,282,170.83 
6028+280.00  4.59  9.18  10.00  91.82  1,282,079.01 
6028+300.00  4.59  9.18  10.00  91.82  1,281,987.19 
6028+320.00  4.59  9.18  10.00  91.82  1,281,895.37 
6028+340.00  4.59  9.18  10.00  91.81  1,281,803.56 
6028+360.00  4.59  9.18  10.00  91.80  1,281,711.76 
6028+380.00  4.59  9.18  10.00  91.81  1,281,619.95 
6028+400.00  4.59  9.18  10.00  91.82  1,281,528.13 
6028+420.00  4.59  9.18  10.00  91.82  1,281,436.31 
6028+440.00  4.59  9.18  10.00  91.82  1,281,344.49 
6028+460.00  4.59  9.18  10.00  91.82  1,281,252.67 
6028+480.00  4.59  9.18  10.00  91.82  1,281,160.85 
6028+500.00  4.59  9.18  10.00  91.82  1,281,069.03 
6028+520.00  4.59  9.18  10.00  91.82  1,280,977.21 
6028+540.00  4.59  9.18  10.00  91.82  1,280,885.39 
6028+560.00  4.59  9.18  10.00  91.82  1,280,793.57 
6028+580.00  4.59  9.18  10.00  91.81  1,280,701.76 
6028+600.00  4.59  9.18  10.00  91.81  1,280,609.95 
6028+620.00  4.59  9.18  10.00  91.82  1,280,518.13 
6028+640.00  4.59  9.18  10.00  91.82  1,280,426.31 
6028+660.00  4.59  9.18  10.00  91.82  1,280,334.49 
6028+680.00  4.59  9.18  10.00  91.82  1,280,242.67 
6028+700.00  4.59  9.18  10.00  91.82  1,280,150.85 
6028+720.00  4.59  9.18  10.00  91.82  1,280,059.03 

665 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6028+740.00  4.59  9.18  10.00  91.82  1,279,967.21 


6028+760.00  4.59  9.18  10.00  91.81  1,279,875.40 
6028+780.00  4.59  9.18  10.00  91.81  1,279,783.59 
6028+800.00  4.59  9.18  10.00  91.81  1,279,691.78 
6028+820.00  4.59  9.18  10.00  91.81  1,279,599.97 
6028+840.00  4.59  9.18  10.00  91.81  1,279,508.16 
6028+860.00  4.59  9.18  10.00  91.81  1,279,416.35 
6028+880.00  4.59  9.18  10.00  91.81  1,279,324.54 
6028+900.00  4.59  9.18  10.00  91.81  1,279,232.73 
6028+920.00  4.59  9.18  10.00  91.81  1,279,140.92 
6028+940.00  4.59  9.18  10.00  91.81  1,279,049.11 
6028+960.00  4.59  9.18  10.00  91.81  1,278,957.30 
6028+980.00  4.59  9.18  10.00  91.81  1,278,865.49 
6029+000.00  4.59  9.18  10.00  91.81  1,278,773.68 
6029+020.00  4.59  9.18  10.00  91.81  1,278,681.87 
6029+040.00  4.59  9.18  10.00  91.81  1,278,590.06 
6029+060.00  4.59  9.18  10.00  91.81  1,278,498.25 
6029+080.00  4.59  9.18  10.00  91.81  1,278,406.44 
6029+100.00  4.59  9.18  10.00  91.81  1,278,314.63 
6029+120.00  4.59  9.18  10.00  91.81  1,278,222.82 
6029+140.00  4.59  9.18  10.00  91.81  1,278,131.01 
6029+160.00  4.59  9.18  10.00  91.81  1,278,039.20 
6029+180.00  4.59  9.18  10.00  91.81  1,277,947.39 
6029+200.00  4.59  9.18  10.00  91.81  1,277,855.58 
6029+220.00  4.59  9.18  10.00  91.81  1,277,763.77 
6029+240.00  4.59  9.18  10.00  91.81  1,277,671.96 
6029+255.00  4.59  9.18  7.50  68.85  1,277,603.11 
6029+255.00  4.59  9.18  0.00  0.00  1,277,603.11 
6029+260.00  4.59  9.18  2.50  22.95  1,277,580.16 
6029+280.00  4.59  9.18  10.00  91.82  1,277,488.34 
6029+300.00  4.59  9.18  10.00  91.82  1,277,396.52 
6029+320.00  4.59  9.18  10.00  91.82  1,277,304.70 
6029+340.00  4.59  9.18  10.00  91.82  1,277,212.88 
6029+340.00  4.59  9.18  0.00  0.00  1,277,212.88 
6029+360.00  4.59  9.18  10.00  91.82  1,277,121.06 
6029+380.00  4.59  9.18  10.00  91.82  1,277,029.24 
6029+400.00  4.59  9.18  10.00  91.82  1,276,937.42 
6029+420.00  4.59  9.18  10.00  91.82  1,276,845.60 
6029+440.00  4.59  9.18  10.00  91.82  1,276,753.78 
6029+449.97  4.59  9.18  4.98  45.75  1,276,708.03 
6029+460.00  4.63  9.22  5.02  46.24  1,276,661.79 
6029+480.00  4.69  9.32  10.00  93.17  1,276,568.62 
6029+500.00  4.76  9.46  10.00  94.55  1,276,474.07 
6029+520.00  4.83  9.60  10.00  95.97  1,276,378.10 
6029+540.00  4.91  9.74  10.00  97.41  1,276,280.69 

666 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6030+000   

6029+560.00  4.98  9.89  10.00  98.89  1,276,181.80 


6029+580.00  5.06  10.04  10.00  100.40  1,276,081.40 
6029+599.97  5.14  10.19  9.98  101.75  1,275,979.65 
6029+600.00  5.14  10.27  0.02  0.18  1,275,979.47 
6029+620.00  5.14  10.27  10.00  102.71  1,275,876.76 
6029+620.00  5.14  10.27  0.00  0.00  1,275,876.76 
6029+640.00  5.14  10.27  10.00  102.71  1,275,774.05 
6029+660.00  5.14  10.27  10.00  102.72  1,275,671.33 
6029+680.00  5.14  10.27  10.00  102.71  1,275,568.62 
6029+700.00  5.14  10.27  10.00  102.71  1,275,465.91 
6029+720.00  5.14  10.27  10.00  102.71  1,275,363.20 
6029+740.00  5.14  10.27  10.00  102.71  1,275,260.49 
6029+760.00  5.14  10.27  10.00  102.71  1,275,157.78 
6029+780.00  5.14  10.27  10.00  102.70  1,275,055.08 
6029+800.00  5.14  10.27  10.00  102.71  1,274,952.37 
6029+820.00  5.14  10.27  10.00  102.71  1,274,849.66 
6029+840.00  5.14  10.27  10.00  102.71  1,274,746.95 
6029+860.00  5.14  10.27  10.00  102.71  1,274,644.24 
6029+880.00  5.14  10.27  10.00  102.71  1,274,541.53 
6029+900.00  5.14  10.27  10.00  102.72  1,274,438.81 
6029+920.00  5.14  10.27  10.00  102.71  1,274,336.10 
6029+940.00  5.14  10.27  10.00  102.71  1,274,233.39 
6029+960.00  5.14  10.27  10.00  102.71  1,274,130.68 
6029+980.00  5.14  10.27  10.00  102.71  1,274,027.97 
6030+000.00  5.14  10.27  10.00  102.71  1,273,925.26 
 

TABLA 50 CÁLCULO DE ACARREOS DE BALASTO DE LA BASE DE MANTENIMIENTO 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM.  0+008.94 AL 0+619.69   

0+008.94  0.04  0.04        1,300,000.00 


0+010.00  0.04  0.08  0.53  0.04  1,299,999.96 
0+012.39  0.07  0.11  1.20  0.13  1,299,999.82 
0+013.00  0.08  0.14  0.31  0.04  1,299,999.78 
0+017.24  0.13  0.21  2.12  0.44  1,299,999.34 
0+020.00  0.18  0.31  1.38  0.43  1,299,998.91 
0+020.01  0.18  0.36  0.00  0.00  1,299,998.91 
0+022.99  0.24  0.42  1.49  0.62  1,299,998.29 
0+027.46  0.34  0.58  2.23  1.29  1,299,997.00 
0+028.79  0.38  0.72  0.67  0.48  1,299,996.53 
0+030.02  0.41  0.78  0.61  0.48  1,299,996.05 

667 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM.  0+008.94 AL 0+619.69   

0+031.77  0.46  0.87  0.88  0.76  1,299,995.29 


0+033.02  0.50  0.96  0.63  0.60  1,299,994.68 
0+034.80  0.56  1.05  0.89  0.93  1,299,993.75 
0+034.99  0.56  1.12  0.10  0.11  1,299,993.64 
0+037.01  0.63  1.19  1.01  1.20  1,299,992.44 
0+038.41  0.68  1.31  0.70  0.91  1,299,991.53 
0+040.00  0.73  1.41  0.80  1.12  1,299,990.41 
0+040.04  0.73  1.46  0.02  0.03  1,299,990.38 
0+041.90  0.80  1.53  0.93  1.42  1,299,988.96 
0+043.02  0.83  1.63  0.56  0.91  1,299,988.04 
0+046.61  0.96  1.79  1.80  3.22  1,299,984.82 
0+050.06  1.08  2.04  1.72  3.51  1,299,981.31 
0+050.82  1.11  2.19  0.38  0.84  1,299,980.47 
0+053.07  1.19  2.30  1.12  2.58  1,299,977.90 
0+053.23  1.19  2.38  0.08  0.20  1,299,977.70 
0+053.48  1.20  2.40  0.12  0.30  1,299,977.40 
0+059.48  1.42  2.63  3.00  7.87  1,299,969.53 
0+060.00  1.44  2.86  0.26  0.75  1,299,968.78 
0+060.08  1.44  2.89  0.04  0.12  1,299,968.66 
0+068.18  1.75  3.19  4.05  12.92  1,299,955.74 
0+070.10  1.82  3.57  0.96  3.44  1,299,952.31 
0+072.45  1.90  3.72  1.17  4.36  1,299,947.94 
0+073.11  1.92  3.82  0.33  1.26  1,299,946.68 
0+075.07  1.98  3.90  0.98  3.82  1,299,942.86 
0+078.20  2.06  4.04  1.56  6.32  1,299,936.54 
0+080.00  2.10  4.16  0.90  3.76  1,299,932.78 
0+080.12  2.10  4.20  0.06  0.26  1,299,932.52 
0+086.87  2.20  4.31  3.37  14.52  1,299,918.01 
0+090.14  2.23  4.44  1.64  7.25  1,299,910.75 
0+092.14  2.25  4.48  1.00  4.48  1,299,906.28 
0+093.14  2.25  4.50  0.50  2.26  1,299,904.02 
0+097.67  2.27  4.53  2.27  10.25  1,299,893.77 
0+100.00  2.28  4.55  1.17  5.31  1,299,888.46 
0+100.14  2.28  4.56  0.07  0.32  1,299,888.14 
0+106.52  2.29  4.57  3.19  14.59  1,299,873.55 
0+110.06  2.29  4.59  1.77  8.11  1,299,865.44 
0+110.14  2.29  4.59  0.04  0.19  1,299,865.25 
0+112.06  2.29  4.59  0.96  4.41  1,299,860.84 
0+113.14  2.29  4.59  0.54  2.47  1,299,858.37 
0+117.63  2.29  4.59  2.24  10.29  1,299,848.08 
0+120.00  2.29  4.59  1.19  5.44  1,299,842.64 
0+120.14  2.29  4.59  0.07  0.32  1,299,842.31 
0+128.48  2.29  4.59  4.17  19.12  1,299,823.19 
0+133.14  2.29  4.59  2.33  10.70  1,299,812.49 
0+140.00  2.29  4.59  3.43  15.73  1,299,796.76 

668 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM.  0+008.94 AL 0+619.69   

0+145.96  2.29  4.59  2.98  13.68  1,299,783.08 


0+153.14  2.29  4.59  3.59  16.47  1,299,766.61 
0+160.00  2.29  4.59  3.43  15.73  1,299,750.88 
0+165.96  2.29  4.59  2.98  13.68  1,299,737.20 
0+173.14  2.29  4.59  3.59  16.47  1,299,720.73 
0+180.00  2.29  4.59  3.43  15.73  1,299,705.00 
0+185.96  2.29  4.59  2.98  13.68  1,299,691.32 
0+193.14  2.29  4.59  3.59  16.47  1,299,674.85 
0+200.00  2.29  4.59  3.43  15.73  1,299,659.12 
0+205.96  2.29  4.59  2.98  13.68  1,299,645.44 
0+213.14  2.29  4.59  3.59  16.47  1,299,628.97 
0+220.00  2.29  4.59  3.43  15.73  1,299,613.24 
0+225.96  2.29  4.59  2.98  13.68  1,299,599.56 
0+233.14  2.29  4.59  3.59  16.47  1,299,583.09 
0+240.00  2.29  4.59  3.43  15.73  1,299,567.36 
0+245.96  2.29  4.59  2.98  13.68  1,299,553.68 
0+253.14  2.29  4.59  3.59  16.47  1,299,537.21 
0+260.00  2.29  4.59  3.43  15.73  1,299,521.48 
0+265.96  2.29  4.59  2.98  13.68  1,299,507.80 
0+273.14  2.29  4.59  3.59  16.47  1,299,491.33 
0+280.00  2.29  4.59  3.43  15.73  1,299,475.60 
0+285.96  2.29  4.59  2.98  13.68  1,299,461.92 
0+293.14  2.29  4.59  3.59  16.47  1,299,445.45 
0+300.00  2.29  4.59  3.43  15.73  1,299,429.72 
0+305.96  2.29  4.59  2.98  13.68  1,299,416.04 
0+313.14  2.29  4.59  3.59  16.47  1,299,399.57 
0+319.55  2.29  4.59  3.21  14.71  1,299,384.86 
0+320.00  2.29  4.59  0.22  1.03  1,299,383.84 
0+323.14  2.29  4.59  1.57  7.21  1,299,376.63 
0+329.55  2.29  4.59  3.21  14.71  1,299,361.92 
0+333.14  2.29  4.59  1.79  8.23  1,299,353.69 
0+340.00  2.29  4.59  3.43  15.73  1,299,337.96 
0+345.96  2.29  4.59  2.98  13.68  1,299,324.28 
0+353.14  2.29  4.59  3.59  16.47  1,299,307.81 
0+360.00  2.29  4.59  3.43  15.73  1,299,292.08 
0+365.96  2.29  4.59  2.98  13.68  1,299,278.40 
0+373.14  2.29  4.59  3.59  16.47  1,299,261.93 
0+380.00  2.29  4.59  3.43  15.73  1,299,246.20 
0+385.96  2.29  4.59  2.98  13.68  1,299,232.52 
0+393.14  2.29  4.59  3.59  16.47  1,299,216.05 
0+400.00  2.29  4.59  3.43  15.73  1,299,200.32 
0+405.96  2.29  4.59  2.98  13.68  1,299,186.64 
0+413.14  2.29  4.59  3.59  16.47  1,299,170.17 
0+420.00  2.29  4.59  3.43  15.73  1,299,154.44 
0+425.96  2.29  4.59  2.98  13.68  1,299,140.76 

669 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM.  0+008.94 AL 0+619.69   

0+433.14  2.29  4.59  3.59  16.47  1,299,124.29 


0+440.00  2.29  4.59  3.43  15.73  1,299,108.56 
0+445.96  2.29  4.59  2.98  13.68  1,299,094.88 
0+453.14  2.29  4.59  3.59  16.47  1,299,078.41 
0+460.00  2.29  4.59  3.43  15.73  1,299,062.68 
0+465.96  2.29  4.59  2.98  13.68  1,299,049.00 
0+473.14  2.29  4.59  3.59  16.47  1,299,032.53 
0+480.00  2.29  4.59  3.43  15.73  1,299,016.80 
0+485.96  2.29  4.59  2.98  13.68  1,299,003.12 
0+493.14  2.29  4.59  3.59  16.47  1,298,986.65 
0+497.63  2.29  4.59  2.24  10.29  1,298,976.36 
0+500.00  2.29  4.59  1.19  5.44  1,298,970.92 
0+500.14  2.29  4.59  0.07  0.32  1,298,970.59 
0+506.55  2.29  4.59  3.21  14.71  1,298,955.88 
0+510.06  2.29  4.59  1.75  8.04  1,298,947.84 
0+510.14  2.29  4.59  0.04  0.19  1,298,947.65 
0+512.07  2.29  4.59  0.96  4.41  1,298,943.24 
0+513.14  2.29  4.59  0.54  2.47  1,298,940.77 
0+517.67  2.29  4.58  2.27  10.37  1,298,930.40 
0+520.00  2.28  4.57  1.16  5.31  1,298,925.08 
0+520.14  2.28  4.56  0.07  0.32  1,298,924.76 
0+526.88  2.25  4.53  3.37  15.28  1,298,909.48 
0+530.15  2.23  4.49  1.63  7.32  1,298,902.16 
0+532.21  2.21  4.45  1.03  4.60  1,298,897.57 
0+533.15  2.21  4.42  0.47  2.06  1,298,895.50 
0+538.23  2.14  4.34  2.54  11.03  1,298,884.47 
0+540.00  2.10  4.24  0.88  3.75  1,298,880.72 
0+540.16  2.10  4.20  0.08  0.33  1,298,880.39 
0+545.05  1.98  4.08  2.44  9.97  1,298,870.42 
0+548.26  1.88  3.86  1.61  6.20  1,298,864.22 
0+550.18  1.81  3.69  0.96  3.55  1,298,860.67 
0+552.70  1.72  3.53  1.26  4.45  1,298,856.22 
0+553.19  1.70  3.42  0.24  0.83  1,298,855.39 
0+559.61  1.46  3.16  3.21  10.15  1,298,845.24 
0+560.00  1.45  2.91  0.20  0.57  1,298,844.67 
0+560.20  1.44  2.88  0.10  0.29  1,298,844.38 
0+566.64  1.20  2.64  3.22  8.50  1,298,835.88 
0+570.22  1.08  2.28  1.79  4.08  1,298,831.80 
0+571.67  1.02  2.10  0.72  1.52  1,298,830.28 
0+573.23  0.97  1.99  0.78  1.55  1,298,828.73 
0+577.10  0.83  1.80  1.93  3.49  1,298,825.24 
0+580.00  0.74  1.57  1.45  2.28  1,298,822.96 
0+580.25  0.73  1.46  0.12  0.18  1,298,822.78 
0+583.10  0.63  1.36  1.43  1.94  1,298,820.85 
0+585.13  0.56  1.19  1.01  1.20  1,298,819.64 

670 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM.  0+008.94 AL 0+619.69   

0+590.27  0.40  0.97  2.57  2.48  1,298,817.16 


0+592.66  0.34  0.74  1.20  0.89  1,298,816.27 
0+593.27  0.33  0.67  0.30  0.20  1,298,816.07 
0+593.88  0.31  0.64  0.30  0.19  1,298,815.88 
0+600.00  0.18  0.49  3.06  1.50  1,298,814.37 
0+600.28  0.18  0.36  0.14  0.05  1,298,814.32 
0+608.49  0.06  0.24  4.11  0.97  1,298,813.35 
0+610.28  0.04  0.10  0.90  0.09  1,298,813.26 
0+613.09  0.02  0.07  1.40  0.09  1,298,813.17 
0+613.28  0.02  0.04  0.10  0.00  1,298,813.17 
0+619.69  0.00  0.02  3.21  0.07  1,298,813.09 
 

TABLA 51 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 6020+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.00   

0+009.48  0.02  0.02        1,300,000.00 


0+010.00  0.02  0.04  0.26  0.01  1,299,999.99 
0+018.10  0.06  0.08  4.05  0.34  1,299,999.65 
0+020.00  0.08  0.14  0.95  0.13  1,299,999.52 
0+020.00  0.08  0.16  0.00  0.00  1,299,999.52 
0+026.06  0.13  0.21  3.03  0.64  1,299,998.88 
0+030.00  0.18  0.31  1.97  0.61  1,299,998.28 
0+033.49  0.22  0.40  1.74  0.69  1,299,997.59 
0+040.00  0.32  0.54  3.25  1.74  1,299,995.84 
0+040.01  0.32  0.63  0.00  0.00  1,299,995.84 
0+040.49  0.32  0.64  0.24  0.15  1,299,995.68 
0+041.50  0.34  0.67  0.51  0.34  1,299,995.35 
0+046.72  0.44  0.78  2.61  2.02  1,299,993.32 
0+050.01  0.50  0.94  1.65  1.54  1,299,991.78 
0+052.57  0.56  1.06  1.28  1.35  1,299,990.44 
0+055.86  0.63  1.19  1.65  1.95  1,299,988.48 
0+057.77  0.68  1.31  0.95  1.24  1,299,987.24 
0+059.92  0.73  1.41  1.07  1.51  1,299,985.73 
0+060.00  0.73  1.46  0.04  0.06  1,299,985.67 
0+060.03  0.73  1.46  0.01  0.02  1,299,985.65 
0+062.24  0.79  1.52  1.11  1.69  1,299,983.97 
0+064.02  0.84  1.62  0.89  1.44  1,299,982.52 
0+067.52  0.93  1.76  1.75  3.09  1,299,979.44 
0+070.04  0.99  1.92  1.26  2.41  1,299,977.03 
0+073.35  1.08  2.07  1.66  3.43  1,299,973.59 

671 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.00   

0+077.97  1.20  2.28  2.31  5.27  1,299,968.32 


0+079.83  1.25  2.46  0.93  2.28  1,299,966.03 
0+080.00  1.26  2.51  0.08  0.21  1,299,965.82 
0+080.05  1.26  2.52  0.02  0.06  1,299,965.76 
0+088.91  1.50  2.76  4.43  12.24  1,299,953.52 
0+090.06  1.54  3.04  0.57  1.75  1,299,951.77 
0+098.16  1.76  3.30  4.05  13.35  1,299,938.43 
0+100.00  1.82  3.58  0.92  3.30  1,299,935.13 
0+100.08  1.82  3.63  0.04  0.14  1,299,934.99 
0+100.17  1.82  3.64  0.05  0.17  1,299,934.82 
0+107.56  1.99  3.81  3.69  14.06  1,299,920.76 
0+110.09  2.03  4.02  1.26  5.08  1,299,915.67 
0+117.14  2.13  4.16  3.53  14.68  1,299,900.99 
0+120.00  2.16  4.29  1.43  6.14  1,299,894.85 
0+120.09  2.16  4.32  0.05  0.20  1,299,894.65 
0+126.84  2.22  4.38  3.38  14.77  1,299,879.88 
0+130.10  2.23  4.45  1.63  7.24  1,299,872.64 
0+136.65  2.26  4.49  3.27  14.72  1,299,857.92 
0+140.00  2.27  4.53  1.68  7.60  1,299,850.33 
0+140.10  2.27  4.54  0.05  0.22  1,299,850.10 
0+146.53  2.28  4.55  3.22  14.65  1,299,835.46 
0+150.10  2.29  4.57  1.78  8.15  1,299,827.31 
0+156.50  2.29  4.58  3.20  14.66  1,299,812.65 
0+160.00  2.29  4.59  1.75  8.04  1,299,804.61 
0+160.09  2.29  4.59  0.04  0.19  1,299,804.42 
0+160.10  2.29  4.59  0.01  0.03  1,299,804.38 
0+166.51  2.29  4.59  3.21  14.71  1,299,789.68 
0+170.10  2.29  4.59  1.79  8.23  1,299,781.44 
0+176.51  2.29  4.59  3.21  14.71  1,299,766.74 
0+180.00  2.29  4.59  1.74  8.00  1,299,758.73 
0+180.10  2.29  4.59  0.05  0.23  1,299,758.50 
0+186.51  2.29  4.59  3.21  14.71  1,299,743.80 
0+190.10  2.29  4.59  1.79  8.23  1,299,735.56 
0+200.00  2.29  4.59  4.95  22.71  1,299,712.85 
0+202.92  2.29  4.59  1.46  6.70  1,299,706.15 
0+210.10  2.29  4.59  3.59  16.47  1,299,689.68 
0+220.00  2.29  4.59  4.95  22.71  1,299,666.97 
0+222.92  2.29  4.59  1.46  6.70  1,299,660.27 
0+230.10  2.29  4.59  3.59  16.47  1,299,643.80 
0+240.00  2.29  4.59  4.95  22.71  1,299,621.09 
0+242.92  2.29  4.59  1.46  6.70  1,299,614.39 
0+250.10  2.29  4.59  3.59  16.47  1,299,597.92 
0+260.00  2.29  4.59  4.95  22.71  1,299,575.21 
0+262.92  2.29  4.59  1.46  6.70  1,299,568.51 
0+270.10  2.29  4.59  3.59  16.47  1,299,552.04 

672 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.00   

0+280.00  2.29  4.59  4.95  22.71  1,299,529.33 


0+282.92  2.29  4.59  1.46  6.70  1,299,522.63 
0+290.10  2.29  4.59  3.59  16.47  1,299,506.16 
0+300.00  2.29  4.59  4.95  22.71  1,299,483.45 
0+302.92  2.29  4.59  1.46  6.70  1,299,476.75 
0+310.10  2.29  4.59  3.59  16.47  1,299,460.28 
0+320.00  2.29  4.59  4.95  22.71  1,299,437.57 
0+322.92  2.29  4.59  1.46  6.70  1,299,430.87 
0+330.10  2.29  4.59  3.59  16.47  1,299,414.40 
0+340.00  2.29  4.59  4.95  22.71  1,299,391.69 
0+342.92  2.29  4.59  1.46  6.70  1,299,384.99 
0+350.10  2.29  4.59  3.59  16.47  1,299,368.52 
0+360.00  2.29  4.59  4.95  22.71  1,299,345.81 
0+362.92  2.29  4.59  1.46  6.70  1,299,339.11 
0+370.10  2.29  4.59  3.59  16.47  1,299,322.64 
0+380.00  2.29  4.59  4.95  22.71  1,299,299.93 
0+382.92  2.29  4.59  1.46  6.70  1,299,293.23 
0+390.10  2.29  4.59  3.59  16.47  1,299,276.76 
0+400.00  2.29  4.59  4.95  22.71  1,299,254.05 
0+402.92  2.29  4.59  1.46  6.70  1,299,247.35 
0+410.10  2.29  4.59  3.59  16.47  1,299,230.88 
0+420.00  2.29  4.59  4.95  22.71  1,299,208.17 
0+422.92  2.29  4.59  1.46  6.70  1,299,201.47 
0+430.10  2.29  4.59  3.59  16.47  1,299,185.00 
0+440.00  2.29  4.59  4.95  22.71  1,299,162.29 
0+442.92  2.29  4.59  1.46  6.70  1,299,155.59 
0+450.10  2.29  4.59  3.59  16.47  1,299,139.12 
0+460.00  2.29  4.59  4.95  22.71  1,299,116.41 
0+462.92  2.29  4.59  1.46  6.70  1,299,109.71 
0+470.10  2.29  4.59  3.59  16.47  1,299,093.24 
0+480.00  2.29  4.59  4.95  22.71  1,299,070.53 
0+482.92  2.29  4.59  1.46  6.70  1,299,063.83 
0+490.10  2.29  4.59  3.59  16.47  1,299,047.36 
0+500.00  2.29  4.59  4.95  22.71  1,299,024.65 
0+502.92  2.29  4.59  1.46  6.70  1,299,017.95 
0+510.10  2.29  4.59  3.59  16.47  1,299,001.48 
0+520.00  2.29  4.59  4.95  22.71  1,298,978.77 
0+522.92  2.29  4.59  1.46  6.70  1,298,972.07 
0+530.10  2.29  4.59  3.59  16.47  1,298,955.60 
0+540.00  2.29  4.59  4.95  22.71  1,298,932.89 
0+542.92  2.29  4.59  1.46  6.70  1,298,926.19 
0+550.10  2.29  4.59  3.59  16.47  1,298,909.72 
0+560.00  2.29  4.59  4.95  22.71  1,298,887.01 
0+562.92  2.29  4.59  1.46  6.70  1,298,880.31 
0+570.10  2.29  4.59  3.59  16.47  1,298,863.84 

673 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.00   

0+580.00  2.29  4.59  4.95  22.71  1,298,841.13 


0+582.92  2.29  4.59  1.46  6.70  1,298,834.43 
0+590.10  2.29  4.59  3.59  16.47  1,298,817.96 
0+600.00  2.29  4.59  4.95  22.71  1,298,795.25 
0+602.92  2.29  4.59  1.46  6.70  1,298,788.55 
0+610.10  2.29  4.59  3.59  16.47  1,298,772.08 
0+620.00  2.29  4.59  4.95  22.71  1,298,749.37 
0+622.92  2.29  4.59  1.46  6.70  1,298,742.67 
0+630.10  2.29  4.59  3.59  16.47  1,298,726.20 
0+640.00  2.29  4.59  4.95  22.71  1,298,703.49 
0+642.92  2.29  4.59  1.46  6.70  1,298,696.79 
0+650.10  2.29  4.59  3.59  16.47  1,298,680.32 
0+660.00  2.29  4.59  4.95  22.71  1,298,657.61 
0+662.92  2.29  4.59  1.46  6.70  1,298,650.91 
0+670.10  2.29  4.59  3.59  16.47  1,298,634.44 
0+680.00  2.29  4.59  4.95  22.71  1,298,611.73 
0+682.92  2.29  4.59  1.46  6.70  1,298,605.03 
0+690.10  2.29  4.59  3.59  16.47  1,298,588.56 
0+700.00  2.29  4.59  4.95  22.71  1,298,565.85 
0+702.92  2.29  4.59  1.46  6.70  1,298,559.15 
0+710.10  2.29  4.59  3.59  16.47  1,298,542.68 
0+720.00  2.29  4.59  4.95  22.71  1,298,519.97 
0+722.92  2.29  4.59  1.46  6.70  1,298,513.27 
0+730.10  2.29  4.59  3.59  16.47  1,298,496.80 
0+740.00  2.29  4.59  4.95  22.71  1,298,474.09 
0+742.92  2.29  4.59  1.46  6.70  1,298,467.39 
0+750.10  2.29  4.59  3.59  16.47  1,298,450.92 
0+760.00  2.29  4.59  4.95  22.71  1,298,428.21 
0+762.92  2.29  4.59  1.46  6.70  1,298,421.51 
0+770.10  2.29  4.59  3.59  16.47  1,298,405.04 
0+780.00  2.29  4.59  4.95  22.71  1,298,382.33 
0+782.92  2.29  4.59  1.46  6.70  1,298,375.63 
0+790.10  2.29  4.59  3.59  16.47  1,298,359.16 
0+800.00  2.29  4.59  4.95  22.71  1,298,336.45 
0+802.92  2.29  4.59  1.46  6.70  1,298,329.75 
0+810.10  2.29  4.59  3.59  16.47  1,298,313.28 
0+820.00  2.29  4.59  4.95  22.71  1,298,290.57 
0+822.92  2.29  4.59  1.46  6.70  1,298,283.87 
0+830.10  2.29  4.59  3.59  16.47  1,298,267.40 
0+840.00  2.29  4.59  4.95  22.71  1,298,244.69 
0+842.92  2.29  4.59  1.46  6.70  1,298,237.99 
0+850.10  2.29  4.59  3.59  16.47  1,298,221.52 
0+860.00  2.29  4.59  4.95  22.71  1,298,198.81 
0+862.92  2.29  4.59  1.46  6.70  1,298,192.11 
0+870.10  2.29  4.59  3.59  16.47  1,298,175.64 

674 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.00   

0+880.00  2.30  4.59  4.95  22.72  1,298,152.92 


0+882.92  2.30  4.59  1.46  6.71  1,298,146.22 
0+890.10  2.30  4.59  3.59  16.48  1,298,129.74 
0+900.00  2.30  4.59  4.95  22.73  1,298,107.01 
0+902.92  2.30  4.59  1.46  6.71  1,298,100.31 
0+910.10  2.30  4.59  3.59  16.48  1,298,083.83 
0+920.00  2.30  4.59  4.95  22.73  1,298,061.10 
0+922.92  2.30  4.59  1.46  6.71  1,298,054.39 
0+930.10  2.30  4.59  3.59  16.48  1,298,037.92 
0+940.00  2.30  4.59  4.95  22.73  1,298,015.19 
0+942.92  2.30  4.59  1.46  6.71  1,298,008.48 
0+950.10  2.30  4.59  3.59  16.48  1,297,992.00 
0+960.00  2.30  4.59  4.95  22.73  1,297,969.28 
0+962.92  2.30  4.59  1.46  6.71  1,297,962.57 
0+970.10  2.30  4.59  3.59  16.48  1,297,946.09 
0+980.00  2.30  4.59  4.95  22.73  1,297,923.37 
0+982.92  2.30  4.59  1.46  6.71  1,297,916.66 
0+990.10  2.29  4.59  3.59  16.48  1,297,900.18 
1+000.00  2.29  4.59  4.95  22.71  1,297,877.47 
1+002.92  2.29  4.59  1.46  6.70  1,297,870.77 
1+010.10  2.30  4.59  3.59  16.47  1,297,854.30 
1+020.00  2.29  4.59  4.95  22.72  1,297,831.59 
1+022.92  2.30  4.59  1.46  6.70  1,297,824.88 
1+030.10  2.30  4.59  3.59  16.48  1,297,808.41 
1+040.00  2.30  4.59  4.95  22.72  1,297,785.69 
1+042.92  2.30  4.59  1.46  6.70  1,297,778.98 
1+050.10  2.29  4.59  3.59  16.47  1,297,762.51 
1+060.00  2.29  4.59  4.95  22.71  1,297,739.80 
1+062.92  2.29  4.59  1.46  6.70  1,297,733.10 
1+070.10  2.29  4.59  3.59  16.47  1,297,716.63 
1+080.00  2.29  4.59  4.95  22.71  1,297,693.92 
1+082.92  2.30  4.59  1.46  6.70  1,297,687.22 
1+090.10  2.30  4.59  3.59  16.48  1,297,670.74 
1+100.00  2.30  4.59  4.95  22.72  1,297,648.02 
1+102.92  2.30  4.59  1.46  6.70  1,297,641.32 
1+110.10  2.30  4.59  3.59  16.48  1,297,624.84 
1+120.00  2.30  4.59  4.95  22.72  1,297,602.12 
1+122.92  2.30  4.59  1.46  6.70  1,297,595.42 
1+130.10  2.29  4.59  3.59  16.47  1,297,578.95 
1+140.00  2.29  4.59  4.95  22.71  1,297,556.24 
1+142.92  2.29  4.59  1.46  6.70  1,297,549.53 
1+150.10  2.30  4.59  3.59  16.47  1,297,533.06 
1+160.00  2.30  4.59  4.95  22.72  1,297,510.34 
1+162.92  2.30  4.59  1.46  6.70  1,297,503.64 
1+170.10  2.30  4.59  3.59  16.48  1,297,487.16 

675 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.00   

1+180.00  2.30  4.59  4.95  22.72  1,297,464.44 


1+182.92  2.30  4.59  1.46  6.70  1,297,457.74 
1+190.10  2.29  4.59  3.59  16.47  1,297,441.27 
1+200.00  2.29  4.59  4.95  22.71  1,297,418.56 
1+202.92  2.29  4.59  1.46  6.70  1,297,411.85 
1+210.10  2.30  4.59  3.59  16.47  1,297,395.38 
1+220.00  2.29  4.59  4.95  22.72  1,297,372.67 
1+222.92  2.30  4.59  1.46  6.70  1,297,365.96 
1+230.10  2.30  4.59  3.59  16.48  1,297,349.49 
1+240.00  2.30  4.59  4.95  22.72  1,297,326.77 
1+242.92  2.30  4.59  1.46  6.70  1,297,320.06 
1+250.10  2.30  4.59  3.59  16.48  1,297,303.59 
1+260.00  2.30  4.59  4.95  22.72  1,297,280.87 
1+262.92  2.30  4.59  1.46  6.70  1,297,274.16 
1+270.10  2.29  4.59  3.59  16.47  1,297,257.69 
1+280.00  2.29  4.59  4.95  22.71  1,297,234.98 
1+282.92  2.29  4.59  1.46  6.70  1,297,228.28 
1+290.10  2.30  4.59  3.59  16.47  1,297,211.81 
1+300.00  2.30  4.59  4.95  22.72  1,297,189.09 
1+302.92  2.30  4.59  1.46  6.70  1,297,182.38 
1+310.10  2.30  4.59  3.59  16.48  1,297,165.91 
1+320.00  2.30  4.59  4.95  22.72  1,297,143.19 
1+322.92  2.30  4.59  1.46  6.70  1,297,136.48 
1+330.10  2.29  4.59  3.59  16.47  1,297,120.01 
1+340.00  2.29  4.59  4.95  22.71  1,297,097.30 
1+342.92  2.29  4.59  1.46  6.70  1,297,090.60 
1+350.10  2.30  4.59  3.59  16.47  1,297,074.13 
1+360.00  2.29  4.59  4.95  22.72  1,297,051.41 
1+362.92  2.30  4.59  1.46  6.70  1,297,044.71 
1+370.10  2.30  4.59  3.59  16.48  1,297,028.23 
1+380.00  2.30  4.59  4.95  22.72  1,297,005.51 
1+382.92  2.30  4.59  1.46  6.70  1,296,998.81 
1+390.10  2.29  4.59  3.59  16.47  1,296,982.34 
1+400.00  2.29  4.59  4.95  22.71  1,296,959.63 
1+402.92  2.29  4.59  1.46  6.70  1,296,952.93 
1+410.10  2.29  4.59  3.59  16.47  1,296,936.46 
1+420.00  2.29  4.59  4.95  22.71  1,296,913.75 
1+422.92  2.29  4.59  1.46  6.70  1,296,907.05 
1+430.10  2.30  4.59  3.59  16.47  1,296,890.57 
1+440.00  2.30  4.59  4.95  22.72  1,296,867.85 
1+442.92  2.30  4.59  1.46  6.70  1,296,861.15 
1+450.10  2.30  4.59  3.59  16.48  1,296,844.67 
1+460.00  2.30  4.59  4.95  22.72  1,296,821.95 
1+462.92  2.30  4.59  1.46  6.70  1,296,815.25 
1+470.10  2.29  4.59  3.59  16.47  1,296,798.78 

676 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.00   

1+480.00  2.29  4.59  4.95  22.71  1,296,776.07 


1+482.92  2.29  4.59  1.46  6.70  1,296,769.37 
1+490.10  2.30  4.59  3.59  16.47  1,296,752.89 
1+500.00  2.30  4.59  4.95  22.72  1,296,730.17 
1+502.92  2.30  4.59  1.46  6.70  1,296,723.47 
1+510.10  2.30  4.59  3.59  16.48  1,296,706.99 
1+520.00  2.30  4.59  4.95  22.72  1,296,684.27 
1+522.92  2.30  4.59  1.46  6.70  1,296,677.57 
1+530.10  2.29  4.59  3.59  16.47  1,296,661.10 
1+540.00  2.29  4.59  4.95  22.71  1,296,638.39 
1+542.92  2.29  4.59  1.46  6.70  1,296,631.69 
1+550.10  2.30  4.59  3.59  16.47  1,296,615.21 
1+560.00  2.29  4.59  4.95  22.71  1,296,592.50 
1+562.92  2.29  4.59  1.46  6.70  1,296,585.81 
1+570.10  2.29  4.59  3.59  16.47  1,296,569.34 
1+580.00  2.29  4.59  4.95  22.71  1,296,546.64 
1+582.92  2.29  4.59  1.46  6.70  1,296,539.94 
1+590.10  2.30  4.59  3.59  16.47  1,296,523.47 
1+600.00  2.29  4.59  4.95  22.71  1,296,500.76 
1+602.92  2.29  4.59  1.46  6.70  1,296,494.06 
1+610.10  2.30  4.59  3.59  16.47  1,296,477.59 
1+620.00  2.29  4.59  4.95  22.71  1,296,454.88 
1+622.92  2.29  4.59  1.46  6.70  1,296,448.18 
1+630.10  2.29  4.59  3.59  16.47  1,296,431.71 
1+640.00  2.29  4.59  4.95  22.71  1,296,409.01 
1+642.92  2.29  4.59  1.46  6.70  1,296,402.31 
1+650.10  2.30  4.59  3.59  16.47  1,296,385.84 
1+656.51  2.29  4.59  3.21  14.71  1,296,371.13 
1+660.00  2.30  4.59  1.75  8.01  1,296,363.13 
1+660.09  2.30  4.59  0.04  0.20  1,296,362.93 
1+660.10  2.30  4.59  0.01  0.03  1,296,362.90 
1+666.53  2.29  4.59  3.22  14.75  1,296,348.14 
1+670.10  2.29  4.58  1.78  8.16  1,296,339.98 
1+676.65  2.28  4.57  3.27  14.95  1,296,325.03 
1+680.00  2.27  4.55  1.68  7.62  1,296,317.41 
1+680.10  2.27  4.54  0.05  0.23  1,296,317.18 
1+686.85  2.25  4.52  3.37  15.24  1,296,301.94 
1+690.10  2.23  4.48  1.63  7.29  1,296,294.65 
1+697.15  2.19  4.42  3.52  15.59  1,296,279.06 
1+700.00  2.16  4.35  1.42  6.19  1,296,272.87 
1+700.11  2.16  4.33  0.05  0.23  1,296,272.64 
1+707.59  2.07  4.23  3.74  15.84  1,296,256.80 
1+710.11  2.03  4.10  1.26  5.19  1,296,251.62 
1+718.20  1.87  3.90  4.04  15.75  1,296,235.87 
1+720.00  1.82  3.69  0.90  3.33  1,296,232.54 

677 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+009.48 AL 1+820.00   

1+720.00  1.82  3.64  0.00  0.00  1,296,232.54 


1+720.13  1.82  3.64  0.06  0.22  1,296,232.31 
1+728.99  1.57  3.38  4.43  14.99  1,296,217.33 
1+730.14  1.53  3.10  0.57  1.78  1,296,215.55 
1+739.93  1.27  2.80  4.90  13.71  1,296,201.84 
1+740.00  1.26  2.53  0.03  0.08  1,296,201.75 
1+740.15  1.26  2.52  0.08  0.19  1,296,201.56 
1+742.20  1.20  2.46  1.03  2.53  1,296,199.04 
1+750.16  0.99  2.19  3.98  8.73  1,296,190.30 
1+756.16  0.84  1.83  3.00  5.48  1,296,184.83 
1+760.00  0.74  1.57  1.92  3.02  1,296,181.81 
1+760.18  0.73  1.47  0.09  0.13  1,296,181.68 
1+760.26  0.73  1.46  0.04  0.06  1,296,181.63 
1+764.31  0.63  1.36  2.03  2.76  1,296,178.87 
1+770.19  0.50  1.13  2.94  3.32  1,296,175.55 
1+778.68  0.34  0.84  4.25  3.57  1,296,171.98 
1+780.00  0.32  0.66  0.66  0.44  1,296,171.54 
1+780.19  0.32  0.64  0.10  0.06  1,296,171.48 
1+781.52  0.30  0.61  0.66  0.40  1,296,171.08 
1+790.20  0.18  0.47  4.34  2.04  1,296,169.03 
1+797.11  0.10  0.28  3.46  0.97  1,296,168.07 
1+800.00  0.08  0.18  1.45  0.26  1,296,167.80 
1+800.20  0.08  0.16  0.10  0.02  1,296,167.79 
1+809.54  0.02  0.10  4.67  0.47  1,296,167.32 
1+810.20  0.02  0.04  0.33  0.01  1,296,167.30 
1+820.00  0.00  0.02  4.90  0.09  1,296,167.21 
 

TABLA 52 CÁLCULO DE ACARREOS DE BALASTO DEL TRAMO 6036+800– 6067+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6036+800.00  4.59  4.59        1,300,000.00 


6036+820.00  4.59  9.18  10.00  91.82  1,299,908.18 
6036+840.00  4.59  9.18  10.00  91.82  1,299,816.36 
6036+860.00  4.59  9.18  10.00  91.82  1,299,724.54 
6036+880.00  4.59  9.18  10.00  91.82  1,299,632.72 
6036+900.00  4.59  9.18  10.00  91.82  1,299,540.90 
6036+920.00  4.59  9.18  10.00  91.82  1,299,449.08 
6036+940.00  4.59  9.18  10.00  91.82  1,299,357.26 
6036+960.00  4.59  9.18  10.00  91.82  1,299,265.44 
6036+980.00  4.59  9.18  10.00  91.82  1,299,173.62 

678 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6036+992.12  4.59  9.18  6.06  55.63  1,299,117.99 


6037+000.00  4.61  9.20  3.94  36.26  1,299,081.73 
6037+020.00  4.66  9.27  10.00  92.66  1,298,989.07 
6037+040.00  4.71  9.36  10.00  93.61  1,298,895.46 
6037+060.00  4.75  9.46  10.00  94.58  1,298,800.88 
6037+080.00  4.80  9.56  10.00  95.56  1,298,705.32 
6037+100.00  4.85  9.66  10.00  96.57  1,298,608.75 
6037+120.00  4.91  9.76  10.00  97.59  1,298,511.16 
6037+140.00  4.96  9.86  10.00  98.62  1,298,412.54 
6037+142.12  4.96  9.92  1.06  10.51  1,298,402.03 
6037+160.00  4.96  9.93  8.94  88.75  1,298,313.28 
6037+180.00  4.96  9.93  10.00  99.26  1,298,214.02 
6037+200.00  4.96  9.93  10.00  99.26  1,298,114.76 
6037+220.00  4.96  9.93  10.00  99.26  1,298,015.50 
6037+240.00  4.96  9.93  10.00  99.26  1,297,916.24 
6037+260.00  4.96  9.93  10.00  99.26  1,297,816.98 
6037+280.00  4.96  9.93  10.00  99.26  1,297,717.72 
6037+300.00  4.96  9.93  10.00  99.26  1,297,618.46 
6037+316.55  4.96  9.93  8.28  82.16  1,297,536.30 
6037+320.00  4.95  9.92  1.72  17.09  1,297,519.22 
6037+340.00  4.90  9.86  10.00  98.55  1,297,420.67 
6037+360.00  4.85  9.75  10.00  97.51  1,297,323.16 
6037+380.00  4.80  9.65  10.00  96.50  1,297,226.66 
6037+400.00  4.75  9.55  10.00  95.51  1,297,131.15 
6037+420.00  4.70  9.45  10.00  94.52  1,297,036.63 
6037+440.00  4.65  9.35  10.00  93.54  1,296,943.09 
6037+460.00  4.61  9.26  10.00  92.60  1,296,850.49 
6037+466.55  4.59  9.20  3.28  30.14  1,296,820.35 
6037+480.00  4.59  9.18  6.72  61.74  1,296,758.61 
6037+500.00  4.59  9.18  10.00  91.82  1,296,666.79 
6037+520.00  4.59  9.18  10.00  91.82  1,296,574.97 
6037+540.00  4.59  9.18  10.00  91.82  1,296,483.15 
6037+560.00  4.59  9.18  10.00  91.82  1,296,391.33 
6037+580.00  4.59  9.18  10.00  91.82  1,296,299.51 
6037+600.00  4.59  9.18  10.00  91.82  1,296,207.69 
6037+620.00  4.59  9.18  10.00  91.82  1,296,115.87 
6037+640.00  4.59  9.18  10.00  91.82  1,296,024.05 
6037+660.00  4.59  9.18  10.00  91.82  1,295,932.23 
6037+680.00  4.59  9.18  10.00  91.82  1,295,840.41 
6037+700.00  4.59  9.18  10.00  91.82  1,295,748.59 
6037+720.00  4.59  9.18  10.00  91.82  1,295,656.77 
6037+740.00  4.59  9.18  10.00  91.82  1,295,564.95 
6037+760.00  4.59  9.18  10.00  91.82  1,295,473.13 
6037+780.00  4.59  9.18  10.00  91.82  1,295,381.31 
6037+800.00  4.59  9.18  10.00  91.82  1,295,289.49 

679 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6037+820.00  4.59  9.18  10.00  91.82  1,295,197.67 


6037+840.00  4.59  9.18  10.00  91.82  1,295,105.85 
6037+860.00  4.59  9.18  10.00  91.82  1,295,014.03 
6037+880.00  4.59  9.18  10.00  91.82  1,294,922.21 
6037+900.00  4.59  9.18  10.00  91.82  1,294,830.39 
6037+920.00  4.59  9.18  10.00  91.82  1,294,738.57 
6037+940.00  4.59  9.18  10.00  91.82  1,294,646.75 
6037+960.00  4.59  9.18  10.00  91.82  1,294,554.93 
6037+980.00  4.59  9.18  10.00  91.82  1,294,463.11 
6038+000.00  4.59  9.18  10.00  91.82  1,294,371.29 
6038+020.00  4.59  9.18  10.00  91.82  1,294,279.47 
6038+040.00  4.59  9.18  10.00  91.82  1,294,187.65 
6038+060.00  4.59  9.18  10.00  91.82  1,294,095.83 
6038+080.00  4.59  9.18  10.00  91.82  1,294,004.01 
6038+100.00  4.59  9.18  10.00  91.82  1,293,912.19 
6038+120.00  4.59  9.18  10.00  91.82  1,293,820.37 
6038+140.00  4.59  9.18  10.00  91.82  1,293,728.55 
6038+160.00  4.59  9.18  10.00  91.82  1,293,636.73 
6038+180.00  4.59  9.18  10.00  91.82  1,293,544.91 
6038+200.00  4.59  9.18  10.00  91.82  1,293,453.09 
6038+220.00  4.59  9.18  10.00  91.82  1,293,361.27 
6038+240.00  4.59  9.18  10.00  91.82  1,293,269.45 
6038+260.00  4.59  9.18  10.00  91.82  1,293,177.63 
6038+280.00  4.59  9.18  10.00  91.82  1,293,085.81 
6038+300.00  4.59  9.18  10.00  91.82  1,292,993.99 
6038+320.00  4.59  9.18  10.00  91.82  1,292,902.17 
6038+340.00  4.59  9.18  10.00  91.82  1,292,810.35 
6038+360.00  4.59  9.18  10.00  91.82  1,292,718.53 
6038+380.00  4.59  9.18  10.00  91.82  1,292,626.71 
6038+400.00  4.59  9.18  10.00  91.82  1,292,534.89 
6038+420.00  4.59  9.18  10.00  91.82  1,292,443.07 
6038+440.00  4.59  9.18  10.00  91.82  1,292,351.25 
6038+460.00  4.59  9.18  10.00  91.82  1,292,259.43 
6038+480.00  4.59  9.18  10.00  91.82  1,292,167.61 
6038+500.00  4.59  9.18  10.00  91.82  1,292,075.79 
6038+520.00  4.59  9.18  10.00  91.82  1,291,983.97 
6038+540.00  4.59  9.18  10.00  91.82  1,291,892.15 
6038+560.00  4.59  9.18  10.00  91.82  1,291,800.33 
6038+580.00  4.59  9.18  10.00  91.82  1,291,708.51 
6038+600.00  4.59  9.18  10.00  91.82  1,291,616.69 
6038+620.00  4.59  9.18  10.00  91.82  1,291,524.87 
6038+640.00  4.59  9.18  10.00  91.82  1,291,433.05 
6038+660.00  4.59  9.18  10.00  91.82  1,291,341.23 
6038+680.00  4.59  9.18  10.00  91.82  1,291,249.41 
6038+700.00  4.59  9.18  10.00  91.82  1,291,157.59 

680 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6038+720.00  4.59  9.18  10.00  91.82  1,291,065.77 


6038+740.00  4.59  9.18  10.00  91.82  1,290,973.95 
6038+760.00  4.59  9.18  10.00  91.82  1,290,882.13 
6038+780.00  4.59  9.18  10.00  91.82  1,290,790.31 
6038+800.00  4.59  9.18  10.00  91.82  1,290,698.49 
6038+820.00  4.59  9.18  10.00  91.82  1,290,606.67 
6038+840.00  4.59  9.18  10.00  91.82  1,290,514.85 
6038+860.00  4.59  9.18  10.00  91.82  1,290,423.03 
6038+880.00  4.59  9.18  10.00  91.82  1,290,331.21 
6038+900.00  4.59  9.18  10.00  91.82  1,290,239.39 
6038+920.00  4.59  9.18  10.00  91.82  1,290,147.57 
6038+940.00  4.59  9.18  10.00  91.82  1,290,055.75 
6038+960.00  4.59  9.18  10.00  91.82  1,289,963.93 
6038+980.00  4.59  9.18  10.00  91.82  1,289,872.11 
6039+000.00  4.59  9.18  10.00  91.82  1,289,780.29 
6039+020.00  4.59  9.18  10.00  91.82  1,289,688.47 
6039+040.00  4.59  9.18  10.00  91.82  1,289,596.65 
6039+060.00  4.59  9.18  10.00  91.82  1,289,504.83 
6039+080.00  4.59  9.18  10.00  91.82  1,289,413.01 
6039+100.00  4.59  9.18  10.00  91.82  1,289,321.19 
6039+120.00  4.59  9.18  10.00  91.82  1,289,229.37 
6039+140.00  4.59  9.18  10.00  91.82  1,289,137.55 
6039+160.00  4.59  9.18  10.00  91.82  1,289,045.73 
6039+180.00  4.59  9.18  10.00  91.82  1,288,953.91 
6039+200.00  4.59  9.18  10.00  91.82  1,288,862.09 
6039+220.00  4.59  9.18  10.00  91.82  1,288,770.27 
6039+240.00  4.59  9.18  10.00  91.82  1,288,678.45 
6039+260.00  4.59  9.18  10.00  91.82  1,288,586.63 
6039+280.00  4.59  9.18  10.00  91.82  1,288,494.81 
6039+300.00  4.59  9.18  10.00  91.82  1,288,402.99 
6039+320.00  4.59  9.18  10.00  91.82  1,288,311.17 
6039+340.00  4.59  9.18  10.00  91.82  1,288,219.35 
6039+360.00  4.59  9.18  10.00  91.82  1,288,127.53 
6039+380.00  4.59  9.18  10.00  91.82  1,288,035.71 
6039+400.00  4.59  9.18  10.00  91.82  1,287,943.89 
6039+420.00  4.59  9.18  10.00  91.82  1,287,852.07 
6039+440.00  4.59  9.18  10.00  91.82  1,287,760.25 
6039+460.00  4.59  9.18  10.00  91.82  1,287,668.43 
6039+480.00  4.59  9.18  10.00  91.82  1,287,576.61 
6039+500.00  4.59  9.18  10.00  91.82  1,287,484.79 
6039+520.00  4.59  9.18  10.00  91.82  1,287,392.97 
6039+540.00  4.59  9.18  10.00  91.82  1,287,301.15 
6039+560.00  4.59  9.18  10.00  91.82  1,287,209.33 
6039+580.00  4.59  9.18  10.00  91.82  1,287,117.51 
6039+600.00  4.59  9.18  10.00  91.82  1,287,025.69 

681 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6039+620.00  4.59  9.18  10.00  91.82  1,286,933.87 


6039+640.00  4.59  9.18  10.00  91.82  1,286,842.05 
6039+660.00  4.59  9.18  10.00  91.82  1,286,750.23 
6039+680.00  4.59  9.18  10.00  91.82  1,286,658.41 
6039+700.00  4.59  9.18  10.00  91.82  1,286,566.59 
6039+720.00  4.59  9.18  10.00  91.82  1,286,474.77 
6039+722.65  4.59  9.18  1.33  12.18  1,286,462.59 
6039+730.00  4.83  9.42  3.67  34.59  1,286,428.00 
6039+740.00  4.92  9.75  5.00  48.75  1,286,379.25 
6039+742.65  4.85  9.77  1.33  12.97  1,286,366.29 
6039+750.00  4.85  9.70  3.67  35.63  1,286,330.66 
6039+760.00  4.85  9.70  5.00  48.50  1,286,282.16 
6039+770.00  4.85  9.70  5.00  48.50  1,286,233.67 
6039+780.00  4.85  9.70  5.00  48.50  1,286,185.17 
6039+790.00  4.85  9.70  5.00  48.50  1,286,136.68 
6039+800.00  4.85  9.70  5.00  48.50  1,286,088.18 
6039+810.00  4.85  9.70  5.00  48.50  1,286,039.69 
6039+820.00  4.85  9.70  5.00  48.50  1,285,991.19 
6039+830.00  4.85  9.70  5.00  48.50  1,285,942.70 
6039+840.00  4.85  9.70  5.00  48.50  1,285,894.20 
6039+850.00  4.85  9.70  5.00  48.50  1,285,845.71 
6039+860.00  4.85  9.70  5.00  48.50  1,285,797.21 
6039+870.00  4.85  9.70  5.00  48.50  1,285,748.72 
6039+880.00  4.85  9.70  5.00  48.50  1,285,700.22 
6039+890.00  4.85  9.70  5.00  48.49  1,285,651.73 
6039+900.00  4.85  9.70  5.00  48.50  1,285,603.24 
6039+910.00  4.85  9.70  5.00  48.50  1,285,554.74 
6039+920.00  4.85  9.70  5.00  48.50  1,285,506.25 
6039+940.00  4.85  9.70  10.00  96.99  1,285,409.26 
6039+960.00  4.85  9.70  10.00  96.98  1,285,312.28 
6039+980.00  4.85  9.70  10.00  96.98  1,285,215.30 
6040+000.00  4.85  9.70  10.00  96.99  1,285,118.31 
6040+020.00  4.85  9.70  10.00  97.00  1,285,021.31 
6040+040.00  4.85  9.70  10.00  96.99  1,284,924.32 
6040+060.00  4.85  9.70  10.00  96.98  1,284,827.34 
6040+080.00  4.85  9.70  10.00  96.98  1,284,730.36 
6040+100.00  4.85  9.70  10.00  96.98  1,284,633.38 
6040+120.00  4.85  9.70  10.00  96.98  1,284,536.40 
6040+140.00  4.85  9.70  10.00  96.98  1,284,439.42 
6040+160.00  4.85  9.70  10.00  96.98  1,284,342.44 
6040+180.00  4.85  9.70  10.00  96.98  1,284,245.46 
6040+200.00  4.85  9.70  10.00  96.98  1,284,148.48 
6040+220.00  4.85  9.70  10.00  96.98  1,284,051.50 
6040+240.00  4.85  9.70  10.00  96.98  1,283,954.52 
6040+260.00  4.85  9.70  10.00  96.98  1,283,857.54 

682 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6040+280.00  4.85  9.70  10.00  96.98  1,283,760.56 


6040+300.00  4.85  9.70  10.00  96.98  1,283,663.58 
6040+320.00  4.85  9.70  10.00  96.98  1,283,566.60 
6040+333.37  4.85  9.70  6.69  64.83  1,283,501.77 
6040+340.00  4.87  9.72  3.31  32.23  1,283,469.54 
6040+360.00  4.95  9.82  10.00  98.19  1,283,371.35 
6040+380.00  5.02  9.97  10.00  99.65  1,283,271.70 
6040+400.00  5.10  10.11  10.00  101.14  1,283,170.56 
6040+420.00  5.17  10.27  10.00  102.66  1,283,067.90 
6040+440.00  5.25  10.42  10.00  104.21  1,282,963.69 
6040+460.00  5.33  10.58  10.00  105.80  1,282,857.89 
6040+480.00  5.41  10.74  10.00  107.41  1,282,750.48 
6040+483.37  5.43  10.84  1.69  18.26  1,282,732.21 
6040+500.00  5.43  10.85  8.31  90.21  1,282,642.00 
6040+520.00  5.43  10.85  10.00  108.50  1,282,533.50 
6040+540.00  5.43  10.85  10.00  108.50  1,282,425.00 
6040+560.00  5.43  10.85  10.00  108.50  1,282,316.50 
6040+580.00  5.43  10.85  10.00  108.50  1,282,208.00 
6040+600.00  5.43  10.85  10.00  108.50  1,282,099.50 
6040+620.00  5.43  10.85  10.00  108.50  1,281,991.00 
6040+640.00  5.43  10.85  10.00  108.50  1,281,882.50 
6040+660.00  5.43  10.85  10.00  108.50  1,281,774.00 
6040+680.00  5.43  10.85  10.00  108.50  1,281,665.50 
6040+700.00  5.43  10.85  10.00  108.50  1,281,557.00 
6040+720.00  5.43  10.85  10.00  108.50  1,281,448.50 
6040+740.00  5.43  10.85  10.00  108.50  1,281,340.00 
6040+760.00  5.43  10.85  10.00  108.50  1,281,231.50 
6040+780.00  5.43  10.85  10.00  108.50  1,281,123.00 
6040+781.48  5.43  10.85  0.74  8.03  1,281,114.97 
6040+800.00  5.35  10.78  9.26  99.78  1,281,015.20 
6040+820.00  5.27  10.62  10.00  106.20  1,280,909.00 
6040+840.00  5.19  10.46  10.00  104.61  1,280,804.39 
6040+860.00  5.11  10.30  10.00  103.04  1,280,701.35 
6040+880.00  5.04  10.15  10.00  101.51  1,280,599.84 
6040+900.00  4.96  10.00  10.00  100.01  1,280,499.83 
6040+920.00  4.89  9.85  10.00  98.54  1,280,401.29 
6040+931.48  4.85  9.74  5.74  55.91  1,280,345.38 
6040+940.00  4.85  9.70  4.26  41.31  1,280,304.06 
6040+960.00  4.85  9.70  10.00  96.98  1,280,207.08 
6040+980.00  4.85  9.70  10.00  96.98  1,280,110.10 
6041+000.00  4.85  9.70  10.00  96.98  1,280,013.12 
6041+020.00  4.85  9.70  10.00  96.98  1,279,916.14 
6041+040.00  4.85  9.70  10.00  96.98  1,279,819.16 
6041+060.00  4.85  9.70  10.00  96.98  1,279,722.18 
6041+080.00  4.85  9.70  10.00  96.98  1,279,625.20 

683 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6041+100.00  4.85  9.70  10.00  96.98  1,279,528.22 


6041+120.00  4.85  9.70  10.00  96.98  1,279,431.24 
6041+140.00  4.85  9.70  10.00  96.98  1,279,334.26 
6041+160.00  4.85  9.70  10.00  96.98  1,279,237.28 
6041+180.00  4.85  9.70  10.00  96.98  1,279,140.30 
6041+200.00  4.85  9.70  10.00  96.98  1,279,043.32 
6041+220.00  4.85  9.70  10.00  96.98  1,278,946.34 
6041+240.00  4.85  9.70  10.00  96.98  1,278,849.36 
6041+260.00  4.85  9.70  10.00  96.98  1,278,752.38 
6041+280.00  4.85  9.70  10.00  96.98  1,278,655.40 
6041+300.00  4.85  9.70  10.00  96.98  1,278,558.42 
6041+320.00  4.85  9.70  10.00  96.98  1,278,461.44 
6041+340.00  4.85  9.70  10.00  96.98  1,278,364.46 
6041+360.00  4.85  9.70  10.00  96.98  1,278,267.48 
6041+380.00  4.85  9.70  10.00  96.98  1,278,170.50 
6041+390.00  4.85  9.70  5.00  48.49  1,278,122.01 
6041+400.00  4.85  9.70  5.00  48.49  1,278,073.52 
6041+410.00  4.85  9.70  5.00  48.49  1,278,025.03 
6041+420.00  4.85  9.70  5.00  48.49  1,277,976.54 
6041+430.00  4.85  9.70  5.00  48.49  1,277,928.05 
6041+440.00  4.85  9.70  5.00  48.49  1,277,879.56 
6041+450.00  4.85  9.70  5.00  48.49  1,277,831.07 
6041+460.00  4.85  9.70  5.00  48.49  1,277,782.58 
6041+470.00  4.85  9.70  5.00  48.49  1,277,734.09 
6041+480.00  4.85  9.70  5.00  48.49  1,277,685.60 
6041+490.00  4.85  9.70  5.00  48.49  1,277,637.11 
6041+500.00  4.85  9.70  5.00  48.49  1,277,588.62 
6041+510.00  4.85  9.70  5.00  48.49  1,277,540.13 
6041+520.00  4.85  9.70  5.00  48.49  1,277,491.64 
6041+530.00  4.85  9.70  5.00  48.49  1,277,443.15 
6041+540.00  4.85  9.70  5.00  48.49  1,277,394.66 
6041+550.00  4.85  9.70  5.00  48.49  1,277,346.17 
6041+560.00  4.85  9.70  5.00  48.49  1,277,297.68 
6041+564.54  4.85  9.70  2.27  22.03  1,277,275.65 
6041+570.00  5.01  9.86  2.73  26.89  1,277,248.76 
6041+580.00  4.74  9.75  5.00  48.74  1,277,200.02 
6041+584.54  4.59  9.33  2.27  21.20  1,277,178.82 
6041+600.00  4.59  9.18  7.73  70.96  1,277,107.86 
6041+620.00  4.59  9.18  10.00  91.82  1,277,016.04 
6041+640.00  4.59  9.18  10.00  91.82  1,276,924.22 
6041+660.00  4.59  9.18  10.00  91.82  1,276,832.40 
6041+680.00  4.59  9.18  10.00  91.82  1,276,740.58 
6041+700.00  4.59  9.18  10.00  91.82  1,276,648.76 
6041+720.00  4.59  9.18  10.00  91.82  1,276,556.94 
6041+740.00  4.59  9.18  10.00  91.82  1,276,465.12 

684 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6041+760.00  4.59  9.18  10.00  91.82  1,276,373.30 


6041+780.00  4.59  9.18  10.00  91.82  1,276,281.48 
6041+800.00  4.59  9.18  10.00  91.82  1,276,189.66 
6041+820.00  4.59  9.18  10.00  91.82  1,276,097.84 
6041+840.00  4.59  9.18  10.00  91.82  1,276,006.02 
6041+860.00  4.59  9.18  10.00  91.82  1,275,914.20 
6041+880.00  4.59  9.18  10.00  91.82  1,275,822.38 
6041+900.00  4.59  9.18  10.00  91.82  1,275,730.56 
6041+920.00  4.59  9.18  10.00  91.82  1,275,638.74 
6041+940.00  4.59  9.18  10.00  91.82  1,275,546.92 
6041+960.00  4.59  9.18  10.00  91.82  1,275,455.10 
6041+980.00  4.59  9.18  10.00  91.82  1,275,363.28 
6042+000.00  4.59  9.18  10.00  91.82  1,275,271.46 
6042+020.00  4.59  9.18  10.00  91.81  1,275,179.65 
6042+040.00  4.59  9.18  10.00  91.81  1,275,087.84 
6042+060.00  4.59  9.18  10.00  91.82  1,274,996.02 
6042+080.00  4.59  9.18  10.00  91.82  1,274,904.20 
6042+100.00  4.59  9.18  10.00  91.81  1,274,812.39 
6042+120.00  4.59  9.18  10.00  91.81  1,274,720.58 
6042+140.00  4.59  9.18  10.00  91.82  1,274,628.76 
6042+160.00  4.59  9.18  10.00  91.82  1,274,536.94 
6042+180.00  4.59  9.18  10.00  91.82  1,274,445.12 
6042+200.00  4.59  9.18  10.00  91.81  1,274,353.31 
6042+220.00  4.59  9.18  10.00  91.81  1,274,261.50 
6042+240.00  4.59  9.18  10.00  91.82  1,274,169.68 
6042+260.00  4.59  9.18  10.00  91.82  1,274,077.86 
6042+280.00  4.59  9.18  10.00  91.82  1,273,986.04 
6042+300.00  4.59  9.18  10.00  91.82  1,273,894.22 
6042+320.00  4.59  9.18  10.00  91.82  1,273,802.40 
6042+340.00  4.59  9.18  10.00  91.81  1,273,710.59 
6042+360.00  4.59  9.18  10.00  91.80  1,273,618.79 
6042+380.00  4.59  9.18  10.00  91.81  1,273,526.98 
6042+400.00  4.59  9.18  10.00  91.82  1,273,435.16 
6042+420.00  4.59  9.18  10.00  91.81  1,273,343.35 
6042+440.00  4.59  9.18  10.00  91.81  1,273,251.54 
6042+460.00  4.59  9.18  10.00  91.82  1,273,159.72 
6042+480.00  4.59  9.18  10.00  91.82  1,273,067.90 
6042+500.00  4.59  9.18  10.00  91.82  1,272,976.08 
6042+520.00  4.59  9.18  10.00  91.82  1,272,884.26 
6042+540.00  4.59  9.18  10.00  91.82  1,272,792.44 
6042+560.00  4.59  9.18  10.00  91.82  1,272,700.62 
6042+580.00  4.59  9.18  10.00  91.82  1,272,608.80 
6042+600.00  4.59  9.18  10.00  91.82  1,272,516.98 
6042+620.00  4.59  9.18  10.00  91.82  1,272,425.16 
6042+640.00  4.59  9.18  10.00  91.82  1,272,333.34 

685 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6042+660.00  4.59  9.18  10.00  91.82  1,272,241.52 


6042+680.00  4.59  9.18  10.00  91.82  1,272,149.70 
6042+700.00  4.59  9.18  10.00  91.82  1,272,057.88 
6042+720.00  4.59  9.18  10.00  91.82  1,271,966.06 
6042+740.00  4.59  9.18  10.00  91.82  1,271,874.24 
6042+760.00  4.59  9.18  10.00  91.82  1,271,782.42 
6042+780.00  4.59  9.18  10.00  91.82  1,271,690.60 
6042+800.00  4.59  9.18  10.00  91.82  1,271,598.78 
6042+820.00  4.59  9.18  10.00  91.82  1,271,506.96 
6042+840.00  4.59  9.18  10.00  91.82  1,271,415.14 
6042+860.00  4.59  9.18  10.00  91.82  1,271,323.32 
6042+880.00  4.59  9.18  10.00  91.82  1,271,231.50 
6042+900.00  4.59  9.18  10.00  91.82  1,271,139.68 
6042+920.00  4.59  9.18  10.00  91.82  1,271,047.86 
6042+940.00  4.59  9.18  10.00  91.82  1,270,956.04 
6042+960.00  4.59  9.18  10.00  91.82  1,270,864.22 
6042+980.00  4.59  9.18  10.00  91.81  1,270,772.41 
6043+000.00  4.59  9.18  10.00  91.81  1,270,680.60 
6043+020.00  4.59  9.18  10.00  91.82  1,270,588.78 
6043+040.00  4.59  9.18  10.00  91.82  1,270,496.96 
6043+060.00  4.59  9.18  10.00  91.81  1,270,405.15 
6043+080.00  4.59  9.18  10.00  91.81  1,270,313.34 
6043+100.00  4.59  9.18  10.00  91.82  1,270,221.52 
6043+120.00  4.59  9.18  10.00  91.82  1,270,129.70 
6043+140.00  4.59  9.18  10.00  91.82  1,270,037.88 
6043+160.00  4.59  9.18  10.00  91.82  1,269,946.06 
6043+180.00  4.59  9.18  10.00  91.82  1,269,854.24 
6043+200.00  4.59  9.18  10.00  91.82  1,269,762.42 
6043+220.00  4.59  9.18  10.00  91.82  1,269,670.60 
6043+240.00  4.59  9.18  10.00  91.82  1,269,578.78 
6043+260.00  4.59  9.18  10.00  91.82  1,269,486.96 
6043+280.00  4.59  9.18  10.00  91.82  1,269,395.14 
6043+300.00  4.59  9.18  10.00  91.82  1,269,303.32 
6043+320.00  4.59  9.18  10.00  91.82  1,269,211.50 
6043+340.00  4.59  9.18  10.00  91.82  1,269,119.68 
6043+360.00  4.59  9.18  10.00  91.82  1,269,027.86 
6043+380.00  4.59  9.18  10.00  91.82  1,268,936.04 
6043+400.00  4.59  9.18  10.00  91.82  1,268,844.22 
6043+420.00  4.59  9.18  10.00  91.82  1,268,752.40 
6043+440.00  4.59  9.18  10.00  91.82  1,268,660.58 
6043+460.00  4.59  9.18  10.00  91.82  1,268,568.76 
6043+480.00  4.59  9.18  10.00  91.82  1,268,476.94 
6043+500.00  4.59  9.18  10.00  91.82  1,268,385.12 
6043+520.00  4.59  9.18  10.00  91.82  1,268,293.30 
6043+540.00  4.59  9.18  10.00  91.82  1,268,201.48 

686 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6043+560.00  4.59  9.18  10.00  91.82  1,268,109.66 


6043+580.00  4.59  9.18  10.00  91.82  1,268,017.84 
6043+600.00  4.59  9.18  10.00  91.82  1,267,926.02 
6043+620.00  4.59  9.18  10.00  91.82  1,267,834.20 
6043+640.00  4.59  9.18  10.00  91.82  1,267,742.38 
6043+660.00  4.59  9.18  10.00  91.82  1,267,650.56 
6043+680.00  4.59  9.18  10.00  91.82  1,267,558.74 
6043+700.00  4.59  9.18  10.00  91.82  1,267,466.92 
6043+720.00  4.59  9.18  10.00  91.82  1,267,375.10 
6043+740.00  4.59  9.18  10.00  91.82  1,267,283.28 
6043+760.00  4.59  9.18  10.00  91.82  1,267,191.46 
6043+780.00  4.59  9.18  10.00  91.82  1,267,099.64 
6043+800.00  4.59  9.18  10.00  91.82  1,267,007.82 
6043+820.00  4.59  9.18  10.00  91.82  1,266,916.00 
6043+840.00  4.59  9.18  10.00  91.82  1,266,824.18 
6043+860.00  4.59  9.18  10.00  91.82  1,266,732.36 
6043+880.00  4.59  9.18  10.00  91.82  1,266,640.54 
6043+900.00  4.59  9.18  10.00  91.82  1,266,548.72 
6043+920.00  4.59  9.18  10.00  91.82  1,266,456.90 
6043+940.00  4.59  9.18  10.00  91.82  1,266,365.08 
6043+960.00  4.59  9.18  10.00  91.82  1,266,273.26 
6043+980.00  4.59  9.18  10.00  91.82  1,266,181.44 
6044+000.00  4.59  9.18  10.00  91.82  1,266,089.62 
6044+020.00  4.59  9.18  10.00  91.82  1,265,997.80 
6044+040.00  4.59  9.18  10.00  91.82  1,265,905.98 
6044+060.00  4.59  9.18  10.00  91.82  1,265,814.16 
6044+080.00  4.59  9.18  10.00  91.82  1,265,722.34 
6044+100.00  4.59  9.18  10.00  91.82  1,265,630.52 
6044+120.00  4.59  9.18  10.00  91.82  1,265,538.70 
6044+140.00  4.59  9.18  10.00  91.82  1,265,446.88 
6044+160.00  4.59  9.18  10.00  91.82  1,265,355.06 
6044+180.00  4.59  9.18  10.00  91.82  1,265,263.24 
6044+185.00  4.59  9.18  2.50  22.96  1,265,240.29 
6044+185.00  4.59  9.18  0.00  0.00  1,265,240.29 
6044+200.00  4.59  9.18  7.50  68.87  1,265,171.42 
6044+220.00  4.59  9.18  10.00  91.82  1,265,079.60 
6044+240.00  4.59  9.18  10.00  91.82  1,264,987.78 
6044+260.00  4.59  9.18  10.00  91.82  1,264,895.96 
6044+280.00  4.59  9.18  10.00  91.81  1,264,804.15 
6044+300.00  4.59  9.18  10.00  91.80  1,264,712.35 
6044+320.00  4.59  9.18  10.00  91.80  1,264,620.55 
6044+320.00  4.59  9.18  0.00  0.00  1,264,620.55 
6044+340.00  4.59  9.18  10.00  91.81  1,264,528.74 
6044+360.00  4.59  9.18  10.00  91.82  1,264,436.92 
6044+370.00  4.59  9.18  5.00  45.91  1,264,391.02 

687 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6044+380.00  4.59  9.18  5.00  45.91  1,264,345.11 


6044+400.00  4.59  9.18  10.00  91.82  1,264,253.29 
6044+420.00  4.59  9.18  10.00  91.82  1,264,161.47 
6044+440.00  4.59  9.18  10.00  91.82  1,264,069.65 
6044+460.00  4.59  9.18  10.00  91.82  1,263,977.83 
6044+480.00  4.59  9.18  10.00  91.82  1,263,886.01 
6044+500.00  4.59  9.18  10.00  91.82  1,263,794.19 
6044+520.00  4.59  9.18  10.00  91.82  1,263,702.37 
6044+540.00  4.59  9.18  10.00  91.82  1,263,610.55 
6044+560.00  4.59  9.18  10.00  91.82  1,263,518.73 
6044+580.00  4.59  9.18  10.00  91.82  1,263,426.91 
6044+600.00  4.59  9.18  10.00  91.82  1,263,335.09 
6044+620.00  4.59  9.18  10.00  91.82  1,263,243.27 
6044+640.00  4.59  9.18  10.00  91.82  1,263,151.45 
6044+660.00  4.59  9.18  10.00  91.82  1,263,059.63 
6044+680.00  4.59  9.18  10.00  91.82  1,262,967.81 
6044+700.00  4.59  9.18  10.00  91.82  1,262,875.99 
6044+720.00  4.59  9.18  10.00  91.82  1,262,784.17 
6044+740.00  4.59  9.18  10.00  91.82  1,262,692.35 
6044+760.00  4.59  9.18  10.00  91.82  1,262,600.53 
6044+780.00  4.59  9.18  10.00  91.82  1,262,508.71 
6044+800.00  4.59  9.18  10.00  91.82  1,262,416.89 
6044+820.00  4.59  9.18  10.00  91.82  1,262,325.07 
6044+840.00  4.59  9.18  10.00  91.82  1,262,233.25 
6044+860.00  4.59  9.18  10.00  91.82  1,262,141.43 
6044+880.00  4.59  9.18  10.00  91.82  1,262,049.61 
6044+900.00  4.59  9.18  10.00  91.82  1,261,957.79 
6044+920.00  4.59  9.18  10.00  91.82  1,261,865.97 
6044+940.00  4.59  9.18  10.00  91.82  1,261,774.15 
6044+960.00  4.59  9.18  10.00  91.82  1,261,682.33 
6044+980.00  4.59  9.18  10.00  91.82  1,261,590.51 
6045+000.00  4.59  9.18  10.00  91.82  1,261,498.69 
6045+020.00  4.59  9.18  10.00  91.82  1,261,406.87 
6045+040.00  4.59  9.18  10.00  91.82  1,261,315.05 
6045+060.00  4.59  9.18  10.00  91.82  1,261,223.23 
6045+080.00  4.59  9.18  10.00  91.82  1,261,131.41 
6045+100.00  4.59  9.18  10.00  91.82  1,261,039.59 
6045+120.00  4.59  9.18  10.00  91.82  1,260,947.77 
6045+140.00  4.59  9.18  10.00  91.82  1,260,855.95 
6045+160.00  4.59  9.18  10.00  91.82  1,260,764.13 
6045+180.00  4.59  9.18  10.00  91.82  1,260,672.31 
6045+200.00  4.59  9.18  10.00  91.82  1,260,580.49 
6045+220.00  4.59  9.18  10.00  91.82  1,260,488.67 
6045+240.00  4.59  9.18  10.00  91.82  1,260,396.85 
6045+260.00  4.59  9.18  10.00  91.82  1,260,305.03 

688 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6045+280.00  4.59  9.18  10.00  91.82  1,260,213.21 


6045+300.00  4.59  9.18  10.00  91.82  1,260,121.39 
6045+320.00  4.59  9.18  10.00  91.82  1,260,029.57 
6045+340.00  4.59  9.18  10.00  91.82  1,259,937.75 
6045+360.00  4.59  9.18  10.00  91.82  1,259,845.93 
6045+380.00  4.59  9.18  10.00  91.82  1,259,754.11 
6045+400.00  4.59  9.18  10.00  91.82  1,259,662.29 
6045+420.00  4.59  9.18  10.00  91.82  1,259,570.47 
6045+440.00  4.59  9.18  10.00  91.82  1,259,478.65 
6045+460.00  4.59  9.18  10.00  91.82  1,259,386.83 
6045+480.00  4.59  9.18  10.00  91.82  1,259,295.01 
6045+500.00  4.59  9.18  10.00  91.82  1,259,203.19 
6045+520.00  4.59  9.18  10.00  91.82  1,259,111.37 
6045+540.00  4.59  9.18  10.00  91.82  1,259,019.55 
6045+560.00  4.59  9.18  10.00  91.82  1,258,927.73 
6045+580.00  4.59  9.18  10.00  91.82  1,258,835.91 
6045+600.00  4.59  9.18  10.00  91.82  1,258,744.09 
6045+620.00  4.59  9.18  10.00  91.82  1,258,652.27 
6045+640.00  4.59  9.18  10.00  91.82  1,258,560.45 
6045+660.00  4.59  9.18  10.00  91.82  1,258,468.63 
6045+680.00  4.59  9.18  10.00  91.82  1,258,376.81 
6045+700.00  4.59  9.18  10.00  91.82  1,258,284.99 
6045+720.00  4.59  9.18  10.00  91.82  1,258,193.17 
6045+740.00  4.59  9.18  10.00  91.82  1,258,101.35 
6045+760.00  4.59  9.18  10.00  91.82  1,258,009.53 
6045+780.00  4.59  9.18  10.00  91.82  1,257,917.71 
6045+800.00  4.59  9.18  10.00  91.82  1,257,825.89 
6045+820.00  4.59  9.18  10.00  91.82  1,257,734.07 
6045+840.00  4.59  9.18  10.00  91.82  1,257,642.25 
6045+860.00  4.59  9.18  10.00  91.82  1,257,550.43 
6045+880.00  4.59  9.18  10.00  91.82  1,257,458.61 
6045+900.00  4.59  9.18  10.00  91.82  1,257,366.79 
6045+920.00  4.59  9.18  10.00  91.82  1,257,274.97 
6045+940.00  4.59  9.18  10.00  91.82  1,257,183.15 
6045+960.00  4.59  9.18  10.00  91.82  1,257,091.33 
6045+980.00  4.59  9.18  10.00  91.82  1,256,999.51 
6046+000.00  4.59  9.18  10.00  91.82  1,256,907.69 
6046+020.00  4.59  9.18  10.00  91.82  1,256,815.87 
6046+040.00  4.59  9.18  10.00  91.82  1,256,724.05 
6046+060.00  4.59  9.18  10.00  91.82  1,256,632.23 
6046+080.00  4.59  9.18  10.00  91.82  1,256,540.41 
6046+100.00  4.59  9.18  10.00  91.82  1,256,448.59 
6046+120.00  4.59  9.18  10.00  91.82  1,256,356.77 
6046+140.00  4.59  9.18  10.00  91.82  1,256,264.95 
6046+160.00  4.59  9.18  10.00  91.82  1,256,173.13 

689 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6046+180.00  4.59  9.18  10.00  91.82  1,256,081.31 


6046+200.00  4.59  9.18  10.00  91.82  1,255,989.49 
6046+220.00  4.59  9.18  10.00  91.82  1,255,897.67 
6046+240.00  4.59  9.18  10.00  91.82  1,255,805.85 
6046+260.00  4.59  9.18  10.00  91.82  1,255,714.03 
6046+280.00  4.59  9.18  10.00  91.82  1,255,622.21 
6046+300.00  4.59  9.18  10.00  91.82  1,255,530.39 
6046+320.00  4.59  9.18  10.00  91.82  1,255,438.57 
6046+340.00  4.59  9.18  10.00  91.82  1,255,346.75 
6046+360.00  4.59  9.18  10.00  91.82  1,255,254.93 
6046+380.00  4.59  9.18  10.00  91.82  1,255,163.11 
6046+400.00  4.59  9.18  10.00  91.82  1,255,071.29 
6046+420.00  4.59  9.18  10.00  91.82  1,254,979.47 
6046+440.00  4.59  9.18  10.00  91.82  1,254,887.65 
6046+460.00  4.59  9.18  10.00  91.82  1,254,795.83 
6046+480.00  4.59  9.18  10.00  91.82  1,254,704.01 
6046+500.00  4.59  9.18  10.00  91.82  1,254,612.19 
6046+520.00  4.59  9.18  10.00  91.82  1,254,520.37 
6046+540.00  4.59  9.18  10.00  91.82  1,254,428.55 
6046+560.00  4.59  9.18  10.00  91.82  1,254,336.73 
6046+580.00  4.59  9.18  10.00  91.82  1,254,244.91 
6046+600.00  4.59  9.18  10.00  91.82  1,254,153.09 
6046+620.00  4.59  9.18  10.00  91.82  1,254,061.27 
6046+640.00  4.59  9.18  10.00  91.82  1,253,969.45 
6046+660.00  4.59  9.18  10.00  91.82  1,253,877.63 
6046+680.00  4.59  9.18  10.00  91.82  1,253,785.81 
6046+700.00  4.59  9.18  10.00  91.82  1,253,693.99 
6046+720.00  4.59  9.18  10.00  91.82  1,253,602.17 
6046+740.00  4.59  9.18  10.00  91.82  1,253,510.35 
6046+760.00  4.59  9.18  10.00  91.82  1,253,418.53 
6046+780.00  4.59  9.18  10.00  91.82  1,253,326.71 
6046+800.00  4.59  9.18  10.00  91.82  1,253,234.89 
6046+820.00  4.59  9.18  10.00  91.82  1,253,143.07 
6046+840.00  4.59  9.18  10.00  91.82  1,253,051.25 
6046+860.00  4.59  9.18  10.00  91.82  1,252,959.43 
6046+880.00  4.59  9.18  10.00  91.82  1,252,867.61 
6046+900.00  4.59  9.18  10.00  91.82  1,252,775.79 
6046+920.00  4.59  9.18  10.00  91.82  1,252,683.97 
6046+940.00  4.59  9.18  10.00  91.82  1,252,592.15 
6046+960.00  4.59  9.18  10.00  91.82  1,252,500.33 
6046+980.00  4.59  9.18  10.00  91.82  1,252,408.51 
6047+000.00  4.59  9.18  10.00  91.82  1,252,316.69 
6047+000.00  4.59  9.18  0.00  0.00  1,252,316.69 
6047+020.00  4.59  9.18  10.00  91.82  1,252,224.87 
6047+040.00  4.59  9.18  10.00  91.82  1,252,133.05 

690 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6047+060.00  4.59  9.18  10.00  91.82  1,252,041.23 


6047+060.00  4.59  9.18  0.00  0.00  1,252,041.23 
6047+080.00  4.59  9.18  10.00  91.82  1,251,949.41 
6047+100.00  4.59  9.18  10.00  91.82  1,251,857.59 
6047+120.00  4.59  9.18  10.00  91.82  1,251,765.77 
6047+140.00  4.59  9.18  10.00  91.82  1,251,673.95 
6047+160.00  4.59  9.18  10.00  91.82  1,251,582.13 
6047+180.00  4.59  9.18  10.00  91.82  1,251,490.31 
6047+200.00  4.59  9.18  10.00  91.82  1,251,398.49 
6047+220.00  4.59  9.18  10.00  91.82  1,251,306.67 
6047+240.00  4.59  9.18  10.00  91.82  1,251,214.85 
6047+260.00  4.59  9.18  10.00  91.82  1,251,123.03 
6047+280.00  4.59  9.18  10.00  91.82  1,251,031.21 
6047+300.00  4.59  9.18  10.00  91.82  1,250,939.39 
6047+320.00  4.59  9.18  10.00  91.82  1,250,847.57 
6047+340.00  4.59  9.18  10.00  91.82  1,250,755.75 
6047+360.00  4.59  9.18  10.00  91.82  1,250,663.93 
6047+380.00  4.59  9.18  10.00  91.82  1,250,572.11 
6047+400.00  4.59  9.18  10.00  91.82  1,250,480.29 
6047+420.00  4.59  9.18  10.00  91.82  1,250,388.47 
6047+440.00  4.59  9.18  10.00  91.82  1,250,296.65 
6047+460.00  4.59  9.18  10.00  91.82  1,250,204.83 
6047+480.00  4.59  9.18  10.00  91.82  1,250,113.01 
6047+500.00  4.59  9.18  10.00  91.82  1,250,021.19 
6047+510.00  4.59  9.18  5.00  45.91  1,249,975.28 
6047+510.00  4.59  9.18  0.00  0.00  1,249,975.28 
6047+520.00  4.59  9.18  5.00  45.91  1,249,929.37 
6047+540.00  4.59  9.18  10.00  91.82  1,249,837.55 
6047+560.00  4.59  9.18  10.00  91.82  1,249,745.73 
6047+580.00  4.59  9.18  10.00  91.82  1,249,653.91 
6047+580.00  4.59  9.18  0.00  0.00  1,249,653.91 
6047+600.00  4.59  9.18  10.00  91.82  1,249,562.09 
6047+620.00  4.59  9.18  10.00  91.82  1,249,470.27 
6047+640.00  4.59  9.18  10.00  91.82  1,249,378.45 
6047+660.00  4.59  9.18  10.00  91.82  1,249,286.63 
6047+680.00  4.59  9.18  10.00  91.81  1,249,194.82 
6047+700.00  4.59  9.18  10.00  91.80  1,249,103.02 
6047+720.00  4.59  9.18  10.00  91.81  1,249,011.21 
6047+740.00  4.59  9.18  10.00  91.82  1,248,919.39 
6047+760.00  4.59  9.18  10.00  91.82  1,248,827.57 
6047+780.00  4.59  9.18  10.00  91.81  1,248,735.76 
6047+800.00  4.59  9.18  10.00  91.81  1,248,643.95 
6047+820.00  4.59  9.18  10.00  91.81  1,248,552.14 
6047+840.00  4.59  9.18  10.00  91.81  1,248,460.33 
6047+860.00  4.59  9.18  10.00  91.82  1,248,368.51 

691 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6047+880.00  4.59  9.18  10.00  91.82  1,248,276.69 


6047+900.00  4.59  9.18  10.00  91.82  1,248,184.87 
6047+920.00  4.59  9.18  10.00  91.82  1,248,093.05 
6047+940.00  4.59  9.18  10.00  91.82  1,248,001.23 
6047+960.00  4.59  9.18  10.00  91.81  1,247,909.42 
6047+980.00  4.59  9.18  10.00  91.81  1,247,817.61 
6048+000.00  4.59  9.18  10.00  91.82  1,247,725.79 
6048+020.00  4.59  9.18  10.00  91.82  1,247,633.97 
6048+040.00  4.59  9.18  10.00  91.81  1,247,542.16 
6048+060.00  4.59  9.18  10.00  91.80  1,247,450.36 
6048+080.00  4.59  9.18  10.00  91.81  1,247,358.55 
6048+100.00  4.59  9.18  10.00  91.82  1,247,266.73 
6048+120.00  4.59  9.18  10.00  91.82  1,247,174.91 
6048+140.00  4.59  9.18  10.00  91.82  1,247,083.09 
6048+160.00  4.59  9.18  10.00  91.82  1,246,991.27 
6048+180.00  4.59  9.18  10.00  91.82  1,246,899.45 
6048+200.00  4.59  9.18  10.00  91.82  1,246,807.63 
6048+220.00  4.59  9.18  10.00  91.82  1,246,715.81 
6048+240.00  4.59  9.18  10.00  91.82  1,246,623.99 
6048+260.00  4.59  9.18  10.00  91.82  1,246,532.17 
6048+280.00  4.59  9.18  10.00  91.82  1,246,440.35 
6048+300.00  4.59  9.18  10.00  91.82  1,246,348.53 
6048+320.00  4.59  9.18  10.00  91.82  1,246,256.71 
6048+340.00  4.59  9.18  10.00  91.82  1,246,164.89 
6048+360.00  4.59  9.18  10.00  91.82  1,246,073.07 
6048+380.00  4.59  9.18  10.00  91.82  1,245,981.25 
6048+400.00  4.59  9.18  10.00  91.82  1,245,889.43 
6048+420.00  4.59  9.18  10.00  91.82  1,245,797.61 
6048+440.00  4.59  9.18  10.00  91.82  1,245,705.79 
6048+460.00  4.59  9.18  10.00  91.82  1,245,613.97 
6048+480.00  4.59  9.18  10.00  91.82  1,245,522.15 
6048+500.00  4.59  9.18  10.00  91.82  1,245,430.33 
6048+520.00  4.59  9.18  10.00  91.82  1,245,338.51 
6048+540.00  4.59  9.18  10.00  91.82  1,245,246.69 
6048+560.00  4.59  9.18  10.00  91.82  1,245,154.87 
6048+580.00  4.59  9.18  10.00  91.82  1,245,063.05 
6048+600.00  4.59  9.18  10.00  91.82  1,244,971.23 
6048+620.00  4.59  9.18  10.00  91.82  1,244,879.41 
6048+640.00  4.59  9.18  10.00  91.82  1,244,787.59 
6048+660.00  4.59  9.18  10.00  91.82  1,244,695.77 
6048+680.00  4.59  9.18  10.00  91.82  1,244,603.95 
6048+700.00  4.59  9.18  10.00  91.82  1,244,512.13 
6048+720.00  4.59  9.18  10.00  91.82  1,244,420.31 
6048+740.00  4.59  9.18  10.00  91.82  1,244,328.49 
6048+760.00  4.59  9.18  10.00  91.82  1,244,236.67 

692 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6048+780.00  4.59  9.18  10.00  91.82  1,244,144.85 


6048+800.00  4.59  9.18  10.00  91.82  1,244,053.03 
6048+820.00  4.59  9.18  10.00  91.82  1,243,961.21 
6048+840.00  4.59  9.18  10.00  91.82  1,243,869.39 
6048+860.00  4.59  9.18  10.00  91.81  1,243,777.58 
6048+880.00  4.59  9.18  10.00  91.81  1,243,685.77 
6048+900.00  4.59  9.18  10.00  91.82  1,243,593.95 
6048+920.00  4.59  9.18  10.00  91.82  1,243,502.13 
6048+940.00  4.59  9.18  10.00  91.82  1,243,410.31 
6048+960.00  4.59  9.18  10.00  91.82  1,243,318.49 
6048+980.00  4.59  9.18  10.00  91.82  1,243,226.67 
6049+000.00  4.59  9.18  10.00  91.82  1,243,134.85 
6049+020.00  4.59  9.18  10.00  91.82  1,243,043.03 
6049+040.00  4.59  9.18  10.00  91.82  1,242,951.21 
6049+060.00  4.59  9.18  10.00  91.82  1,242,859.39 
6049+080.00  4.59  9.18  10.00  91.82  1,242,767.57 
6049+100.00  4.59  9.18  10.00  91.82  1,242,675.75 
6049+120.00  4.59  9.18  10.00  91.82  1,242,583.93 
6049+140.00  4.59  9.18  10.00  91.82  1,242,492.11 
6049+160.00  4.59  9.18  10.00  91.81  1,242,400.30 
6049+180.00  4.59  9.18  10.00  91.81  1,242,308.49 
6049+200.00  4.59  9.18  10.00  91.81  1,242,216.68 
6049+220.00  4.59  9.18  10.00  91.81  1,242,124.87 
6049+240.00  4.59  9.18  10.00  91.81  1,242,033.06 
6049+260.00  4.59  9.18  10.00  91.81  1,241,941.25 
6049+280.00  4.59  9.18  10.00  91.81  1,241,849.44 
6049+300.00  4.59  9.18  10.00  91.81  1,241,757.63 
6049+320.00  4.59  9.18  10.00  91.81  1,241,665.82 
6049+340.00  4.59  9.18  10.00  91.81  1,241,574.01 
6049+360.00  4.59  9.18  10.00  91.82  1,241,482.19 
6049+380.00  4.59  9.18  10.00  91.82  1,241,390.37 
6049+400.00  4.59  9.18  10.00  91.81  1,241,298.56 
6049+420.00  4.59  9.18  10.00  91.80  1,241,206.76 
6049+440.00  4.59  9.18  10.00  91.81  1,241,114.95 
6049+460.00  4.59  9.18  10.00  91.82  1,241,023.13 
6049+480.00  4.59  9.18  10.00  91.82  1,240,931.31 
6049+500.00  4.59  9.18  10.00  91.82  1,240,839.49 
6049+520.00  4.59  9.18  10.00  91.82  1,240,747.67 
6049+540.00  4.59  9.18  10.00  91.82  1,240,655.85 
6049+560.00  4.59  9.18  10.00  91.82  1,240,564.03 
6049+580.00  4.59  9.18  10.00  91.82  1,240,472.21 
6049+600.00  4.59  9.18  10.00  91.82  1,240,380.39 
6049+620.00  4.59  9.18  10.00  91.82  1,240,288.57 
6049+640.00  4.59  9.18  10.00  91.82  1,240,196.75 
6049+660.00  4.59  9.18  10.00  91.82  1,240,104.93 

693 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6049+680.00  4.59  9.18  10.00  91.82  1,240,013.11 


6049+700.00  4.59  9.18  10.00  91.82  1,239,921.29 
6049+720.00  4.59  9.18  10.00  91.82  1,239,829.47 
6049+740.00  4.59  9.18  10.00  91.82  1,239,737.65 
6049+760.00  4.59  9.18  10.00  91.82  1,239,645.83 
6049+780.00  4.59  9.18  10.00  91.82  1,239,554.01 
6049+800.00  4.59  9.18  10.00  91.82  1,239,462.19 
6049+820.00  4.59  9.18  10.00  91.82  1,239,370.37 
6049+840.00  4.59  9.18  10.00  91.82  1,239,278.55 
6049+860.00  4.59  9.18  10.00  91.82  1,239,186.73 
6049+880.00  4.59  9.18  10.00  91.82  1,239,094.91 
6049+900.00  4.59  9.18  10.00  91.82  1,239,003.09 
6049+920.00  4.59  9.18  10.00  91.82  1,238,911.27 
6049+940.00  4.59  9.18  10.00  91.82  1,238,819.45 
6049+960.00  4.59  9.18  10.00  91.82  1,238,727.63 
6049+980.00  4.59  9.18  10.00  91.82  1,238,635.81 
6050+000.00  4.59  9.18  10.00  91.82  1,238,543.99 
6050+020.00  4.59  9.18  10.00  91.82  1,238,452.17 
6050+040.00  4.59  9.18  10.00  91.82  1,238,360.35 
6050+060.00  4.59  9.18  10.00  91.82  1,238,268.53 
6050+080.00  4.59  9.18  10.00  91.82  1,238,176.71 
6050+100.00  4.59  9.18  10.00  91.82  1,238,084.89 
6050+120.00  4.59  9.18  10.00  91.82  1,237,993.07 
6050+140.00  4.59  9.18  10.00  91.82  1,237,901.25 
6050+160.00  4.59  9.18  10.00  91.82  1,237,809.43 
6050+180.00  4.59  9.18  10.00  91.82  1,237,717.61 
6050+200.00  4.59  9.18  10.00  91.82  1,237,625.79 
6050+220.00  4.59  9.18  10.00  91.82  1,237,533.97 
6050+240.00  4.59  9.18  10.00  91.82  1,237,442.15 
6050+260.00  4.59  9.18  10.00  91.82  1,237,350.33 
6050+280.00  4.59  9.18  10.00  91.82  1,237,258.51 
6050+300.00  4.59  9.18  10.00  91.82  1,237,166.69 
6050+320.00  4.59  9.18  10.00  91.82  1,237,074.87 
6050+340.00  4.59  9.18  10.00  91.82  1,236,983.05 
6050+360.00  4.59  9.18  10.00  91.82  1,236,891.23 
6050+380.00  4.59  9.18  10.00  91.82  1,236,799.41 
6050+400.00  4.59  9.18  10.00  91.82  1,236,707.59 
6050+420.00  4.59  9.18  10.00  91.82  1,236,615.77 
6050+440.00  4.59  9.18  10.00  91.82  1,236,523.95 
6050+460.00  4.59  9.18  10.00  91.82  1,236,432.13 
6050+480.00  4.59  9.18  10.00  91.82  1,236,340.31 
6050+500.00  4.59  9.18  10.00  91.82  1,236,248.49 
6050+520.00  4.59  9.18  10.00  91.82  1,236,156.67 
6050+540.00  4.59  9.18  10.00  91.82  1,236,064.85 
6050+560.00  4.59  9.18  10.00  91.82  1,235,973.03 

694 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6050+580.00  4.59  9.18  10.00  91.82  1,235,881.21 


6050+600.00  4.59  9.18  10.00  91.82  1,235,789.39 
6050+620.00  4.59  9.18  10.00  91.81  1,235,697.58 
6050+640.00  4.59  9.18  10.00  91.81  1,235,605.77 
6050+660.00  4.59  9.18  10.00  91.82  1,235,513.95 
6050+680.00  4.59  9.18  10.00  91.82  1,235,422.13 
6050+700.00  4.59  9.18  10.00  91.81  1,235,330.32 
6050+720.00  4.59  9.18  10.00  91.81  1,235,238.51 
6050+740.00  4.59  9.18  10.00  91.82  1,235,146.69 
6050+760.00  4.59  9.18  10.00  91.82  1,235,054.87 
6050+780.00  4.59  9.18  10.00  91.81  1,234,963.06 
6050+800.00  4.59  9.18  10.00  91.81  1,234,871.25 
6050+820.00  4.59  9.18  10.00  91.82  1,234,779.43 
6050+840.00  4.59  9.18  10.00  91.81  1,234,687.62 
6050+860.00  4.59  9.18  10.00  91.81  1,234,595.81 
6050+880.00  4.59  9.18  10.00  91.81  1,234,504.00 
6050+900.00  4.59  9.18  10.00  91.81  1,234,412.19 
6050+920.00  4.59  9.18  10.00  91.82  1,234,320.37 
6050+940.00  4.59  9.18  10.00  91.82  1,234,228.55 
6050+960.00  4.59  9.18  10.00  91.82  1,234,136.73 
6050+980.00  4.59  9.18  10.00  91.82  1,234,044.91 
6051+000.00  4.59  9.18  10.00  91.82  1,233,953.09 
6051+020.00  4.59  9.18  10.00  91.82  1,233,861.27 
6051+040.00  4.59  9.18  10.00  91.82  1,233,769.45 
6051+060.00  4.59  9.18  10.00  91.82  1,233,677.63 
6051+080.00  4.59  9.18  10.00  91.82  1,233,585.81 
6051+100.00  4.59  9.18  10.00  91.82  1,233,493.99 
6051+120.00  4.59  9.18  10.00  91.82  1,233,402.17 
6051+140.00  4.59  9.18  10.00  91.82  1,233,310.35 
6051+160.00  4.59  9.18  10.00  91.82  1,233,218.53 
6051+180.00  4.59  9.18  10.00  91.82  1,233,126.71 
6051+200.00  4.59  9.18  10.00  91.82  1,233,034.89 
6051+220.00  4.59  9.18  10.00  91.82  1,232,943.07 
6051+240.00  4.59  9.18  10.00  91.82  1,232,851.25 
6051+260.00  4.59  9.18  10.00  91.82  1,232,759.43 
6051+280.00  4.59  9.18  10.00  91.82  1,232,667.61 
6051+300.00  4.59  9.18  10.00  91.82  1,232,575.79 
6051+320.00  4.59  9.18  10.00  91.82  1,232,483.97 
6051+340.00  4.59  9.18  10.00  91.82  1,232,392.15 
6051+360.00  4.59  9.18  10.00  91.82  1,232,300.33 
6051+380.00  4.59  9.18  10.00  91.82  1,232,208.51 
6051+400.00  4.59  9.18  10.00  91.82  1,232,116.69 
6051+420.00  4.59  9.18  10.00  91.82  1,232,024.87 
6051+440.00  4.59  9.18  10.00  91.82  1,231,933.05 
6051+460.00  4.59  9.18  10.00  91.82  1,231,841.23 

695 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6051+480.00  4.59  9.18  10.00  91.82  1,231,749.41 


6051+500.00  4.59  9.18  10.00  91.82  1,231,657.59 
6051+520.00  4.59  9.18  10.00  91.82  1,231,565.77 
6051+540.00  4.59  9.18  10.00  91.82  1,231,473.95 
6051+560.00  4.59  9.18  10.00  91.82  1,231,382.13 
6051+580.00  4.59  9.18  10.00  91.82  1,231,290.31 
6051+600.00  4.59  9.18  10.00  91.82  1,231,198.49 
6051+620.00  4.59  9.18  10.00  91.82  1,231,106.67 
6051+640.00  4.59  9.18  10.00  91.82  1,231,014.85 
6051+660.00  4.59  9.18  10.00  91.82  1,230,923.03 
6051+680.00  4.59  9.18  10.00  91.82  1,230,831.21 
6051+700.00  4.59  9.18  10.00  91.82  1,230,739.39 
6051+720.00  4.59  9.18  10.00  91.82  1,230,647.57 
6051+740.00  4.59  9.18  10.00  91.82  1,230,555.75 
6051+760.00  4.59  9.18  10.00  91.82  1,230,463.93 
6051+780.00  4.59  9.18  10.00  91.82  1,230,372.11 
6051+800.00  4.59  9.18  10.00  91.82  1,230,280.29 
6051+820.00  4.59  9.18  10.00  91.82  1,230,188.47 
6051+840.00  4.59  9.18  10.00  91.82  1,230,096.65 
6051+860.00  4.59  9.18  10.00  91.82  1,230,004.83 
6051+880.00  4.59  9.18  10.00  91.82  1,229,913.01 
6051+900.00  4.59  9.18  10.00  91.82  1,229,821.19 
6051+920.00  4.59  9.18  10.00  91.82  1,229,729.37 
6051+940.00  4.59  9.18  10.00  91.82  1,229,637.55 
6051+960.00  4.59  9.18  10.00  91.82  1,229,545.73 
6051+980.00  4.59  9.18  10.00  91.82  1,229,453.91 
6052+000.00  4.59  9.18  10.00  91.82  1,229,362.09 
6052+020.00  4.59  9.18  10.00  91.82  1,229,270.27 
6052+040.00  4.59  9.18  10.00  91.82  1,229,178.45 
6052+060.00  4.59  9.18  10.00  91.82  1,229,086.63 
6052+080.00  4.59  9.18  10.00  91.82  1,228,994.81 
6052+100.00  4.59  9.18  10.00  91.82  1,228,902.99 
6052+120.00  4.59  9.18  10.00  91.82  1,228,811.17 
6052+140.00  4.59  9.18  10.00  91.82  1,228,719.35 
6052+160.00  4.59  9.18  10.00  91.82  1,228,627.53 
6052+180.00  4.59  9.18  10.00  91.82  1,228,535.71 
6052+200.00  4.59  9.18  10.00  91.82  1,228,443.89 
6052+220.00  4.59  9.18  10.00  91.82  1,228,352.07 
6052+240.00  4.59  9.18  10.00  91.82  1,228,260.25 
6052+260.00  4.59  9.18  10.00  91.82  1,228,168.43 
6052+280.00  4.59  9.18  10.00  91.82  1,228,076.61 
6052+300.00  4.59  9.18  10.00  91.82  1,227,984.79 
6052+320.00  4.59  9.18  10.00  91.82  1,227,892.97 
6052+340.00  4.59  9.18  10.00  91.82  1,227,801.15 
6052+360.00  4.59  9.18  10.00  91.82  1,227,709.33 

696 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6052+380.00  4.59  9.18  10.00  91.82  1,227,617.51 


6052+400.00  4.59  9.18  10.00  91.82  1,227,525.69 
6052+420.00  4.59  9.18  10.00  91.82  1,227,433.87 
6052+420.00  4.59  9.18  0.00  0.00  1,227,433.87 
6052+440.00  4.59  9.18  10.00  91.82  1,227,342.05 
6052+460.00  4.59  9.18  10.00  91.82  1,227,250.23 
6052+480.00  4.59  9.18  10.00  91.82  1,227,158.41 
6052+490.00  4.59  9.18  5.00  45.91  1,227,112.50 
6052+490.00  4.59  9.18  0.00  0.00  1,227,112.50 
6052+500.00  4.59  9.18  5.00  45.91  1,227,066.59 
6052+520.00  4.59  9.18  10.00  91.82  1,226,974.77 
6052+540.00  4.59  9.18  10.00  91.82  1,226,882.95 
6052+560.00  4.59  9.18  10.00  91.82  1,226,791.13 
6052+580.00  4.59  9.18  10.00  91.82  1,226,699.31 
6052+600.00  4.59  9.18  10.00  91.82  1,226,607.49 
6052+620.00  4.59  9.18  10.00  91.82  1,226,515.67 
6052+640.00  4.59  9.18  10.00  91.82  1,226,423.85 
6052+660.00  4.59  9.18  10.00  91.82  1,226,332.03 
6052+680.00  4.59  9.18  10.00  91.82  1,226,240.21 
6052+700.00  4.59  9.18  10.00  91.82  1,226,148.39 
6052+720.00  4.59  9.18  10.00  91.82  1,226,056.57 
6052+740.00  4.59  9.18  10.00  91.82  1,225,964.75 
6052+760.00  4.59  9.18  10.00  91.82  1,225,872.93 
6052+780.00  4.59  9.18  10.00  91.82  1,225,781.11 
6052+800.00  4.59  9.18  10.00  91.82  1,225,689.29 
6052+820.00  4.59  9.18  10.00  91.82  1,225,597.47 
6052+840.00  4.59  9.18  10.00  91.82  1,225,505.65 
6052+860.00  4.59  9.18  10.00  91.82  1,225,413.83 
6052+880.00  4.59  9.18  10.00  91.82  1,225,322.01 
6052+900.00  4.59  9.18  10.00  91.82  1,225,230.19 
6052+920.00  4.59  9.18  10.00  91.82  1,225,138.37 
6052+940.00  4.59  9.18  10.00  91.82  1,225,046.55 
6052+960.00  4.59  9.18  10.00  91.82  1,224,954.73 
6052+980.00  4.59  9.18  10.00  91.82  1,224,862.91 
6053+000.00  4.59  9.18  10.00  91.82  1,224,771.09 
6053+020.00  4.59  9.18  10.00  91.82  1,224,679.27 
6053+040.00  4.59  9.18  10.00  91.82  1,224,587.45 
6053+060.00  4.59  9.18  10.00  91.82  1,224,495.63 
6053+080.00  4.59  9.18  10.00  91.82  1,224,403.81 
6053+100.00  4.59  9.18  10.00  91.82  1,224,311.99 
6053+120.00  4.59  9.18  10.00  91.82  1,224,220.17 
6053+140.00  4.59  9.18  10.00  91.82  1,224,128.35 
6053+160.00  4.59  9.18  10.00  91.82  1,224,036.53 
6053+180.00  4.59  9.18  10.00  91.82  1,223,944.71 
6053+200.00  4.59  9.18  10.00  91.82  1,223,852.89 

697 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6053+220.00  4.59  9.18  10.00  91.82  1,223,761.07 


6053+240.00  4.59  9.18  10.00  91.82  1,223,669.25 
6053+260.00  4.59  9.18  10.00  91.82  1,223,577.43 
6053+280.00  4.59  9.18  10.00  91.82  1,223,485.61 
6053+300.00  4.59  9.18  10.00  91.82  1,223,393.79 
6053+320.00  4.59  9.18  10.00  91.82  1,223,301.97 
6053+340.00  4.59  9.18  10.00  91.81  1,223,210.16 
6053+360.00  4.59  9.18  10.00  91.81  1,223,118.35 
6053+380.00  4.59  9.18  10.00  91.82  1,223,026.53 
6053+400.00  4.59  9.18  10.00  91.82  1,222,934.71 
6053+420.00  4.59  9.18  10.00  91.82  1,222,842.89 
6053+440.00  4.59  9.18  10.00  91.82  1,222,751.07 
6053+460.00  4.59  9.18  10.00  91.82  1,222,659.25 
6053+480.00  4.59  9.18  10.00  91.82  1,222,567.43 
6053+500.00  4.59  9.18  10.00  91.82  1,222,475.61 
6053+520.00  4.59  9.18  10.00  91.82  1,222,383.79 
6053+540.00  4.59  9.18  10.00  91.82  1,222,291.97 
6053+560.00  4.59  9.18  10.00  91.81  1,222,200.16 
6053+580.00  4.59  9.18  10.00  91.81  1,222,108.35 
6053+600.00  4.59  9.18  10.00  91.82  1,222,016.53 
6053+620.00  4.59  9.18  10.00  91.82  1,221,924.71 
6053+640.00  4.59  9.18  10.00  91.82  1,221,832.89 
6053+660.00  4.59  9.18  10.00  91.82  1,221,741.07 
6053+680.00  4.59  9.18  10.00  91.81  1,221,649.26 
6053+700.00  4.59  9.18  10.00  91.81  1,221,557.45 
6053+720.00  4.59  9.18  10.00  91.82  1,221,465.63 
6053+740.00  4.59  9.18  10.00  91.82  1,221,373.81 
6053+760.00  4.59  9.18  10.00  91.82  1,221,281.99 
6053+780.00  4.59  9.18  10.00  91.82  1,221,190.17 
6053+800.00  4.59  9.18  10.00  91.82  1,221,098.35 
6053+820.00  4.59  9.18  10.00  91.82  1,221,006.53 
6053+840.00  4.59  9.18  10.00  91.81  1,220,914.72 
6053+860.00  4.59  9.18  10.00  91.81  1,220,822.91 
6053+880.00  4.59  9.18  10.00  91.81  1,220,731.10 
6053+900.00  4.59  9.18  10.00  91.81  1,220,639.29 
6053+920.00  4.59  9.18  10.00  91.81  1,220,547.48 
6053+940.00  4.59  9.18  10.00  91.81  1,220,455.67 
6053+960.00  4.59  9.18  10.00  91.82  1,220,363.85 
6053+980.00  4.59  9.18  10.00  91.82  1,220,272.03 
6054+000.00  4.59  9.18  10.00  91.82  1,220,180.21 
6054+020.00  4.59  9.18  10.00  91.81  1,220,088.40 
6054+040.00  4.59  9.18  10.00  91.81  1,219,996.59 
6054+060.00  4.59  9.18  10.00  91.82  1,219,904.77 
6054+080.00  4.59  9.18  10.00  91.82  1,219,812.95 
6054+100.00  4.59  9.18  10.00  91.82  1,219,721.13 

698 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6054+120.00  4.59  9.18  10.00  91.81  1,219,629.32 


6054+140.00  4.59  9.18  10.00  91.81  1,219,537.51 
6054+160.00  4.59  9.18  10.00  91.82  1,219,445.69 
6054+180.00  4.59  9.18  10.00  91.82  1,219,353.87 
6054+200.00  4.59  9.18  10.00  91.82  1,219,262.05 
6054+220.00  4.59  9.18  10.00  91.81  1,219,170.24 
6054+240.00  4.59  9.18  10.00  91.81  1,219,078.43 
6054+260.00  4.59  9.18  10.00  91.82  1,218,986.61 
6054+280.00  4.59  9.18  10.00  91.82  1,218,894.79 
6054+300.00  4.59  9.18  10.00  91.82  1,218,802.97 
6054+320.00  4.59  9.18  10.00  91.82  1,218,711.15 
6054+340.00  4.59  9.18  10.00  91.82  1,218,619.33 
6054+360.00  4.59  9.18  10.00  91.82  1,218,527.51 
6054+380.00  4.59  9.18  10.00  91.82  1,218,435.69 
6054+400.00  4.59  9.18  10.00  91.82  1,218,343.87 
6054+420.00  4.59  9.18  10.00  91.82  1,218,252.05 
6054+440.00  4.59  9.18  10.00  91.82  1,218,160.23 
6054+460.00  4.59  9.18  10.00  91.82  1,218,068.41 
6054+480.00  4.59  9.18  10.00  91.82  1,217,976.59 
6054+500.00  4.59  9.18  10.00  91.82  1,217,884.77 
6054+520.00  4.59  9.18  10.00  91.82  1,217,792.95 
6054+540.00  4.59  9.18  10.00  91.82  1,217,701.13 
6054+560.00  4.59  9.18  10.00  91.82  1,217,609.31 
6054+580.00  4.59  9.18  10.00  91.82  1,217,517.49 
6054+600.00  4.59  9.18  10.00  91.82  1,217,425.67 
6054+620.00  4.59  9.18  10.00  91.82  1,217,333.85 
6054+640.00  4.59  9.18  10.00  91.82  1,217,242.03 
6054+660.00  4.59  9.18  10.00  91.82  1,217,150.21 
6054+680.00  4.59  9.18  10.00  91.82  1,217,058.39 
6054+700.00  4.59  9.18  10.00  91.82  1,216,966.57 
6054+720.00  4.59  9.18  10.00  91.82  1,216,874.75 
6054+740.00  4.59  9.18  10.00  91.82  1,216,782.93 
6054+760.00  4.59  9.18  10.00  91.82  1,216,691.11 
6054+780.00  4.59  9.18  10.00  91.82  1,216,599.29 
6054+800.00  4.59  9.18  10.00  91.82  1,216,507.47 
6054+820.00  4.59  9.18  10.00  91.82  1,216,415.65 
6054+840.00  4.59  9.18  10.00  91.82  1,216,323.83 
6054+860.00  4.59  9.18  10.00  91.82  1,216,232.01 
6054+880.00  4.59  9.18  10.00  91.82  1,216,140.19 
6054+900.00  4.59  9.18  10.00  91.82  1,216,048.37 
6054+920.00  4.59  9.18  10.00  91.81  1,215,956.56 
6054+940.00  4.59  9.18  10.00  91.81  1,215,864.75 
6054+960.00  4.59  9.18  10.00  91.82  1,215,772.93 
6054+980.00  4.59  9.18  10.00  91.82  1,215,681.11 
6055+000.00  4.59  9.18  10.00  91.82  1,215,589.29 

699 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6055+020.00  4.59  9.18  10.00  91.82  1,215,497.47 


6055+040.00  4.59  9.18  10.00  91.82  1,215,405.65 
6055+060.00  4.59  9.18  10.00  91.82  1,215,313.83 
6055+080.00  4.59  9.18  10.00  91.82  1,215,222.01 
6055+100.00  4.59  9.18  10.00  91.82  1,215,130.19 
6055+120.00  4.59  9.18  10.00  91.82  1,215,038.37 
6055+140.00  4.59  9.18  10.00  91.82  1,214,946.55 
6055+160.00  4.59  9.18  10.00  91.81  1,214,854.74 
6055+180.00  4.59  9.18  10.00  91.81  1,214,762.93 
6055+200.00  4.59  9.18  10.00  91.82  1,214,671.11 
6055+220.00  4.59  9.18  10.00  91.82  1,214,579.29 
6055+240.00  4.59  9.18  10.00  91.82  1,214,487.47 
6055+260.00  4.59  9.18  10.00  91.82  1,214,395.65 
6055+280.00  4.59  9.18  10.00  91.82  1,214,303.83 
6055+300.00  4.59  9.18  10.00  91.81  1,214,212.02 
6055+320.00  4.59  9.18  10.00  91.80  1,214,120.22 
6055+340.00  4.59  9.18  10.00  91.80  1,214,028.42 
6055+360.00  4.59  9.18  10.00  91.80  1,213,936.62 
6055+380.00  4.59  9.18  10.00  91.80  1,213,844.82 
6055+400.00  4.59  9.18  10.00  91.80  1,213,753.02 
6055+420.00  4.59  9.18  10.00  91.80  1,213,661.22 
6055+440.00  4.59  9.18  10.00  91.80  1,213,569.42 
6055+460.00  4.59  9.18  10.00  91.80  1,213,477.62 
6055+480.00  4.59  9.18  10.00  91.80  1,213,385.82 
6055+500.00  4.59  9.18  10.00  91.80  1,213,294.02 
6055+520.00  4.59  9.18  10.00  91.81  1,213,202.21 
6055+540.00  4.59  9.18  10.00  91.82  1,213,110.39 
6055+560.00  4.59  9.18  10.00  91.82  1,213,018.57 
6055+580.00  4.59  9.18  10.00  91.82  1,212,926.75 
6055+600.00  4.59  9.18  10.00  91.82  1,212,834.93 
6055+620.00  4.59  9.18  10.00  91.82  1,212,743.11 
6055+640.00  4.59  9.18  10.00  91.82  1,212,651.29 
6055+660.00  4.59  9.18  10.00  91.82  1,212,559.47 
6055+680.00  4.59  9.18  10.00  91.82  1,212,467.65 
6055+700.00  4.59  9.18  10.00  91.82  1,212,375.83 
6055+720.00  4.59  9.18  10.00  91.81  1,212,284.02 
6055+740.00  4.59  9.18  10.00  91.81  1,212,192.21 
6055+760.00  4.59  9.18  10.00  91.81  1,212,100.40 
6055+780.00  4.59  9.18  10.00  91.81  1,212,008.59 
6055+800.00  4.59  9.18  10.00  91.82  1,211,916.77 
6055+820.00  4.59  9.18  10.00  91.82  1,211,824.95 
6055+840.00  4.59  9.18  10.00  91.82  1,211,733.13 
6055+860.00  4.59  9.18  10.00  91.81  1,211,641.32 
6055+880.00  4.59  9.18  10.00  91.81  1,211,549.51 
6055+900.00  4.59  9.18  10.00  91.82  1,211,457.69 

700 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6055+920.00  4.59  9.18  10.00  91.82  1,211,365.87 


6055+940.00  4.59  9.18  10.00  91.82  1,211,274.05 
6055+960.00  4.59  9.18  10.00  91.82  1,211,182.23 
6055+980.00  4.59  9.18  10.00  91.82  1,211,090.41 
6056+000.00  4.59  9.18  10.00  91.82  1,210,998.59 
6056+020.00  4.59  9.18  10.00  91.81  1,210,906.78 
6056+040.00  4.59  9.18  10.00  91.80  1,210,814.98 
6056+060.00  4.59  9.18  10.00  91.81  1,210,723.17 
6056+080.00  4.59  9.18  10.00  91.82  1,210,631.35 
6056+100.00  4.59  9.18  10.00  91.82  1,210,539.53 
6056+120.00  4.59  9.18  10.00  91.82  1,210,447.71 
6056+140.00  4.59  9.18  10.00  91.82  1,210,355.89 
6056+160.00  4.59  9.18  10.00  91.81  1,210,264.08 
6056+170.00  4.59  9.18  5.00  45.91  1,210,218.18 
6056+170.00  4.59  9.18  0.00  0.00  1,210,218.18 
6056+180.00  4.59  9.18  5.00  45.91  1,210,172.27 
6056+200.00  4.59  9.18  10.00  91.82  1,210,080.45 
6056+220.00  4.59  9.18  10.00  91.81  1,209,988.64 
6056+240.00  4.59  9.18  10.00  91.81  1,209,896.83 
6056+260.00  4.59  9.18  10.00  91.82  1,209,805.01 
6056+280.00  4.59  9.18  10.00  91.82  1,209,713.19 
6056+300.00  4.59  9.18  10.00  91.82  1,209,621.37 
6056+300.00  4.59  9.18  0.00  0.00  1,209,621.37 
6056+320.00  4.59  9.18  10.00  91.82  1,209,529.55 
6056+340.00  4.59  9.18  10.00  91.82  1,209,437.73 
6056+360.00  4.59  9.18  10.00  91.82  1,209,345.91 
6056+380.00  4.59  9.18  10.00  91.82  1,209,254.09 
6056+400.00  4.59  9.18  10.00  91.82  1,209,162.27 
6056+420.00  4.59  9.18  10.00  91.82  1,209,070.45 
6056+440.00  4.59  9.18  10.00  91.82  1,208,978.63 
6056+460.00  4.59  9.18  10.00  91.82  1,208,886.81 
6056+480.00  4.59  9.18  10.00  91.82  1,208,794.99 
6056+500.00  4.59  9.18  10.00  91.82  1,208,703.17 
6056+520.00  4.59  9.18  10.00  91.82  1,208,611.35 
6056+540.00  4.59  9.18  10.00  91.82  1,208,519.53 
6056+560.00  4.59  9.18  10.00  91.82  1,208,427.71 
6056+580.00  4.59  9.18  10.00  91.82  1,208,335.89 
6056+600.00  4.59  9.18  10.00  91.82  1,208,244.07 
6056+614.06  4.59  9.18  7.03  64.57  1,208,179.50 
6056+620.00  4.59  9.18  2.97  27.25  1,208,152.25 
6056+640.00  4.59  9.18  10.00  91.81  1,208,060.44 
6056+644.06  4.59  9.18  2.03  18.65  1,208,041.78 
6056+660.00  4.59  9.18  7.97  73.15  1,207,968.64 
6056+680.00  4.59  9.18  10.00  91.80  1,207,876.84 
6056+700.00  4.59  9.18  10.00  91.80  1,207,785.04 

701 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6056+720.00  4.59  9.18  10.00  91.80  1,207,693.24 


6056+734.82  4.59  9.18  7.41  68.02  1,207,625.22 
6056+740.00  4.59  9.18  2.59  23.79  1,207,601.43 
6056+760.00  4.59  9.18  10.00  91.80  1,207,509.63 
6056+764.82  4.59  9.18  2.41  22.11  1,207,487.51 
6056+770.00  4.59  9.18  2.59  23.80  1,207,463.72 
6056+770.00  4.59  9.18  0.00  0.00  1,207,463.72 
6056+780.00  4.59  9.18  5.00  45.91  1,207,417.81 
6056+800.00  4.59  9.18  10.00  91.82  1,207,325.99 
6056+820.00  4.59  9.18  10.00  91.82  1,207,234.17 
6056+840.00  4.59  9.18  10.00  91.82  1,207,142.35 
6056+860.00  4.59  9.18  10.00  91.82  1,207,050.53 
6056+860.00  4.59  9.18  0.00  0.00  1,207,050.53 
6056+880.00  4.59  9.18  10.00  91.82  1,206,958.71 
6056+900.00  4.59  9.18  10.00  91.82  1,206,866.89 
6056+920.00  4.59  9.18  10.00  91.82  1,206,775.07 
6056+940.00  4.59  9.18  10.00  91.82  1,206,683.25 
6056+960.00  4.59  9.18  10.00  91.82  1,206,591.43 
6056+980.00  4.59  9.18  10.00  91.82  1,206,499.61 
6057+000.00  4.59  9.18  10.00  91.82  1,206,407.79 
6057+020.00  4.59  9.18  10.00  91.82  1,206,315.97 
6057+040.00  4.59  9.18  10.00  91.82  1,206,224.15 
6057+060.00  4.59  9.18  10.00  91.82  1,206,132.33 
6057+080.00  4.59  9.18  10.00  91.82  1,206,040.51 
6057+100.00  4.59  9.18  10.00  91.82  1,205,948.69 
6057+120.00  4.59  9.18  10.00  91.82  1,205,856.87 
6057+140.00  4.59  9.18  10.00  91.82  1,205,765.05 
6057+160.00  4.59  9.18  10.00  91.82  1,205,673.23 
6057+180.00  4.59  9.18  10.00  91.82  1,205,581.41 
6057+200.00  4.59  9.18  10.00  91.82  1,205,489.59 
6057+220.00  4.59  9.18  10.00  91.82  1,205,397.77 
6057+240.00  4.59  9.18  10.00  91.81  1,205,305.96 
6057+260.00  4.59  9.18  10.00  91.80  1,205,214.16 
6057+270.00  4.59  9.18  5.00  45.91  1,205,168.25 
6057+270.00  4.59  9.18  0.00  0.00  1,205,168.25 
6057+280.00  4.59  9.18  5.00  45.91  1,205,122.35 
6057+300.00  4.59  9.18  10.00  91.80  1,205,030.55 
6057+320.00  4.59  9.18  10.00  91.80  1,204,938.75 
6057+340.00  4.59  9.18  10.00  91.80  1,204,846.95 
6057+340.00  4.59  9.18  0.00  0.00  1,204,846.95 
6057+360.00  4.59  9.18  10.00  91.80  1,204,755.15 
6057+380.00  4.59  9.18  10.00  91.81  1,204,663.34 
6057+400.00  4.59  9.18  10.00  91.82  1,204,571.52 
6057+420.00  4.59  9.18  10.00  91.82  1,204,479.70 
6057+440.00  4.59  9.18  10.00  91.82  1,204,387.88 

702 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6057+460.00  4.59  9.18  10.00  91.82  1,204,296.06 


6057+480.00  4.59  9.18  10.00  91.81  1,204,204.25 
6057+500.00  4.59  9.18  10.00  91.81  1,204,112.44 
6057+520.00  4.59  9.18  10.00  91.82  1,204,020.62 
6057+540.00  4.59  9.18  10.00  91.82  1,203,928.80 
6057+560.00  4.59  9.18  10.00  91.82  1,203,836.98 
6057+580.00  4.59  9.18  10.00  91.81  1,203,745.17 
6057+600.00  4.59  9.18  10.00  91.81  1,203,653.36 
6057+620.00  4.59  9.18  10.00  91.82  1,203,561.54 
6057+640.00  4.59  9.18  10.00  91.81  1,203,469.73 
6057+660.00  4.59  9.18  10.00  91.81  1,203,377.92 
6057+680.00  4.59  9.18  10.00  91.82  1,203,286.10 
6057+700.00  4.59  9.18  10.00  91.82  1,203,194.28 
6057+720.00  4.59  9.18  10.00  91.82  1,203,102.46 
6057+740.00  4.59  9.18  10.00  91.82  1,203,010.64 
6057+760.00  4.59  9.18  10.00  91.82  1,202,918.82 
6057+780.00  4.59  9.18  10.00  91.81  1,202,827.01 
6057+800.00  4.59  9.18  10.00  91.81  1,202,735.20 
6057+820.00  4.59  9.18  10.00  91.81  1,202,643.39 
6057+840.00  4.59  9.18  10.00  91.81  1,202,551.58 
6057+860.00  4.59  9.18  10.00  91.82  1,202,459.76 
6057+880.00  4.59  9.18  10.00  91.82  1,202,367.94 
6057+900.00  4.59  9.18  10.00  91.82  1,202,276.12 
6057+920.00  4.59  9.18  10.00  91.82  1,202,184.30 
6057+940.00  4.59  9.18  10.00  91.82  1,202,092.48 
6057+960.00  4.59  9.18  10.00  91.82  1,202,000.66 
6057+980.00  4.59  9.18  10.00  91.82  1,201,908.84 
6058+000.00  4.59  9.18  10.00  91.82  1,201,817.02 
6058+020.00  4.59  9.18  10.00  91.82  1,201,725.20 
6058+040.00  4.59  9.18  10.00  91.82  1,201,633.38 
6058+060.00  4.59  9.18  10.00  91.82  1,201,541.56 
6058+080.00  4.59  9.18  10.00  91.82  1,201,449.74 
6058+100.00  4.59  9.18  10.00  91.82  1,201,357.92 
6058+120.00  4.59  9.18  10.00  91.82  1,201,266.10 
6058+140.00  4.59  9.18  10.00  91.82  1,201,174.28 
6058+160.00  4.59  9.18  10.00  91.82  1,201,082.46 
6058+180.00  4.59  9.18  10.00  91.82  1,200,990.64 
6058+200.00  4.59  9.18  10.00  91.82  1,200,898.82 
6058+220.00  4.59  9.18  10.00  91.82  1,200,807.00 
6058+240.00  4.59  9.18  10.00  91.82  1,200,715.18 
6058+260.00  4.59  9.18  10.00  91.82  1,200,623.36 
6058+280.00  4.59  9.18  10.00  91.82  1,200,531.54 
6058+300.00  4.59  9.18  10.00  91.82  1,200,439.72 
6058+320.00  4.59  9.18  10.00  91.82  1,200,347.90 
6058+340.00  4.59  9.18  10.00  91.82  1,200,256.08 

703 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6058+360.00  4.59  9.18  10.00  91.82  1,200,164.26 


6058+380.00  4.59  9.18  10.00  91.82  1,200,072.44 
6058+400.00  4.59  9.18  10.00  91.82  1,199,980.62 
6058+420.00  4.59  9.18  10.00  91.82  1,199,888.80 
6058+440.00  4.59  9.18  10.00  91.82  1,199,796.98 
6058+460.00  4.59  9.18  10.00  91.82  1,199,705.16 
6058+480.00  4.59  9.18  10.00  91.82  1,199,613.34 
6058+500.00  4.59  9.18  10.00  91.82  1,199,521.52 
6058+520.00  4.59  9.18  10.00  91.82  1,199,429.70 
6058+540.00  4.59  9.18  10.00  91.82  1,199,337.88 
6058+560.00  4.59  9.18  10.00  91.82  1,199,246.06 
6058+580.00  4.59  9.18  10.00  91.82  1,199,154.24 
6058+600.00  4.59  9.18  10.00  91.82  1,199,062.42 
6058+620.00  4.59  9.18  10.00  91.82  1,198,970.60 
6058+640.00  4.59  9.18  10.00  91.82  1,198,878.78 
6058+660.00  4.59  9.18  10.00  91.82  1,198,786.96 
6058+680.00  4.59  9.18  10.00  91.82  1,198,695.14 
6058+700.00  4.59  9.18  10.00  91.82  1,198,603.32 
6058+720.00  4.59  9.18  10.00  91.82  1,198,511.50 
6058+740.00  4.59  9.18  10.00  91.82  1,198,419.68 
6058+760.00  4.59  9.18  10.00  91.82  1,198,327.86 
6058+780.00  4.59  9.18  10.00  91.82  1,198,236.04 
6058+800.00  4.59  9.18  10.00  91.82  1,198,144.22 
6058+820.00  4.59  9.18  10.00  91.82  1,198,052.40 
6058+840.00  4.59  9.18  10.00  91.82  1,197,960.58 
6058+860.00  4.59  9.18  10.00  91.82  1,197,868.76 
6058+880.00  4.59  9.18  10.00  91.82  1,197,776.94 
6058+900.00  4.59  9.18  10.00  91.82  1,197,685.12 
6058+920.00  4.59  9.18  10.00  91.82  1,197,593.30 
6058+940.00  4.59  9.18  10.00  91.82  1,197,501.48 
6058+960.00  4.59  9.18  10.00  91.82  1,197,409.66 
6058+980.00  4.59  9.18  10.00  91.82  1,197,317.84 
6059+000.00  4.59  9.18  10.00  91.82  1,197,226.02 
6059+020.00  4.59  9.18  10.00  91.82  1,197,134.20 
6059+040.00  4.59  9.18  10.00  91.82  1,197,042.38 
6059+060.00  4.59  9.18  10.00  91.82  1,196,950.56 
6059+080.00  4.59  9.18  10.00  91.82  1,196,858.74 
6059+100.00  4.59  9.18  10.00  91.82  1,196,766.92 
6059+120.00  4.59  9.18  10.00  91.82  1,196,675.10 
6059+140.00  4.59  9.18  10.00  91.82  1,196,583.28 
6059+160.00  4.59  9.18  10.00  91.82  1,196,491.46 
6059+180.00  4.59  9.18  10.00  91.82  1,196,399.64 
6059+200.00  4.59  9.18  10.00  91.82  1,196,307.82 
6059+220.00  4.59  9.18  10.00  91.82  1,196,216.00 
6059+240.00  4.59  9.18  10.00  91.82  1,196,124.18 

704 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6059+260.00  4.59  9.18  10.00  91.82  1,196,032.36 


6059+280.00  4.59  9.18  10.00  91.82  1,195,940.54 
6059+300.00  4.59  9.18  10.00  91.82  1,195,848.72 
6059+320.00  4.59  9.18  10.00  91.82  1,195,756.90 
6059+340.00  4.59  9.18  10.00  91.82  1,195,665.08 
6059+360.00  4.59  9.18  10.00  91.82  1,195,573.26 
6059+380.00  4.59  9.18  10.00  91.82  1,195,481.44 
6059+400.00  4.59  9.18  10.00  91.82  1,195,389.62 
6059+420.00  4.59  9.18  10.00  91.82  1,195,297.80 
6059+440.00  4.59  9.18  10.00  91.82  1,195,205.98 
6059+460.00  4.59  9.18  10.00  91.82  1,195,114.16 
6059+480.00  4.59  9.18  10.00  91.82  1,195,022.34 
6059+500.00  4.59  9.18  10.00  91.82  1,194,930.52 
6059+520.00  4.59  9.18  10.00  91.82  1,194,838.70 
6059+540.00  4.59  9.18  10.00  91.82  1,194,746.88 
6059+560.00  4.59  9.18  10.00  91.81  1,194,655.07 
6059+580.00  4.59  9.18  10.00  91.81  1,194,563.26 
6059+600.00  4.59  9.18  10.00  91.82  1,194,471.44 
6059+620.00  4.59  9.18  10.00  91.82  1,194,379.62 
6059+640.00  4.59  9.18  10.00  91.82  1,194,287.80 
6059+660.00  4.59  9.18  10.00  91.82  1,194,195.98 
6059+680.00  4.59  9.18  10.00  91.81  1,194,104.17 
6059+700.00  4.59  9.18  10.00  91.81  1,194,012.36 
6059+720.00  4.59  9.18  10.00  91.82  1,193,920.54 
6059+740.00  4.59  9.18  10.00  91.82  1,193,828.72 
6059+760.00  4.59  9.18  10.00  91.82  1,193,736.90 
6059+780.00  4.59  9.18  10.00  91.82  1,193,645.08 
6059+800.00  4.59  9.18  10.00  91.82  1,193,553.26 
6059+820.00  4.59  9.18  10.00  91.82  1,193,461.44 
6059+840.00  4.59  9.18  10.00  91.82  1,193,369.62 
6059+860.00  4.59  9.18  10.00  91.82  1,193,277.80 
6059+880.00  4.59  9.18  10.00  91.82  1,193,185.98 
6059+900.00  4.59  9.18  10.00  91.82  1,193,094.16 
6059+920.00  4.59  9.18  10.00  91.82  1,193,002.34 
6059+940.00  4.59  9.18  10.00  91.82  1,192,910.52 
6059+960.00  4.59  9.18  10.00  91.81  1,192,818.71 
6059+980.00  4.59  9.18  10.00  91.81  1,192,726.90 
6060+000.00  4.59  9.18  10.00  91.82  1,192,635.08 
6060+020.00  4.59  9.18  10.00  91.82  1,192,543.26 
6060+040.00  4.59  9.18  10.00  91.81  1,192,451.45 
6060+060.00  4.59  9.18  10.00  91.81  1,192,359.64 
6060+080.00  4.59  9.18  10.00  91.82  1,192,267.82 
6060+100.00  4.59  9.18  10.00  91.82  1,192,176.00 
6060+120.00  4.59  9.18  10.00  91.82  1,192,084.18 
6060+140.00  4.59  9.18  10.00  91.82  1,191,992.36 

705 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6060+160.00  4.59  9.18  10.00  91.82  1,191,900.54 


6060+180.00  4.59  9.18  10.00  91.82  1,191,808.72 
6060+200.00  4.59  9.18  10.00  91.82  1,191,716.90 
6060+220.00  4.59  9.18  10.00  91.82  1,191,625.08 
6060+240.00  4.59  9.18  10.00  91.82  1,191,533.26 
6060+260.00  4.59  9.18  10.00  91.82  1,191,441.44 
6060+280.00  4.59  9.18  10.00  91.82  1,191,349.62 
6060+300.00  4.59  9.18  10.00  91.82  1,191,257.80 
6060+320.00  4.59  9.18  10.00  91.82  1,191,165.98 
6060+340.00  4.59  9.18  10.00  91.82  1,191,074.16 
6060+360.00  4.59  9.18  10.00  91.82  1,190,982.34 
6060+380.00  4.59  9.18  10.00  91.82  1,190,890.52 
6060+400.00  4.59  9.18  10.00  91.82  1,190,798.70 
6060+420.00  4.59  9.18  10.00  91.82  1,190,706.88 
6060+440.00  4.59  9.18  10.00  91.82  1,190,615.06 
6060+460.00  4.59  9.18  10.00  91.82  1,190,523.24 
6060+480.00  4.59  9.18  10.00  91.82  1,190,431.42 
6060+500.00  4.59  9.18  10.00  91.82  1,190,339.60 
6060+520.00  4.59  9.18  10.00  91.82  1,190,247.78 
6060+540.00  4.59  9.18  10.00  91.82  1,190,155.96 
6060+560.00  4.59  9.18  10.00  91.82  1,190,064.14 
6060+580.00  4.59  9.18  10.00  91.82  1,189,972.32 
6060+600.00  4.59  9.18  10.00  91.82  1,189,880.50 
6060+620.00  4.59  9.18  10.00  91.82  1,189,788.68 
6060+640.00  4.59  9.18  10.00  91.82  1,189,696.86 
6060+660.00  4.59  9.18  10.00  91.82  1,189,605.04 
6060+680.00  4.59  9.18  10.00  91.82  1,189,513.22 
6060+700.00  4.59  9.18  10.00  91.82  1,189,421.40 
6060+720.00  4.59  9.18  10.00  91.82  1,189,329.58 
6060+740.00  4.59  9.18  10.00  91.82  1,189,237.76 
6060+760.00  4.59  9.18  10.00  91.82  1,189,145.94 
6060+780.00  4.59  9.18  10.00  91.82  1,189,054.12 
6060+800.00  4.59  9.18  10.00  91.82  1,188,962.30 
6060+820.00  4.59  9.18  10.00  91.82  1,188,870.48 
6060+840.00  4.59  9.18  10.00  91.82  1,188,778.66 
6060+860.00  4.59  9.18  10.00  91.82  1,188,686.84 
6060+880.00  4.59  9.18  10.00  91.82  1,188,595.02 
6060+900.00  4.59  9.18  10.00  91.82  1,188,503.20 
6060+920.00  4.59  9.18  10.00  91.82  1,188,411.38 
6060+940.00  4.59  9.18  10.00  91.82  1,188,319.56 
6060+960.00  4.59  9.18  10.00  91.82  1,188,227.74 
6060+980.00  4.59  9.18  10.00  91.82  1,188,135.92 
6061+000.00  4.59  9.18  10.00  91.82  1,188,044.10 
6061+020.00  4.59  9.18  10.00  91.82  1,187,952.28 
6061+040.00  4.59  9.18  10.00  91.82  1,187,860.46 

706 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6061+060.00  4.59  9.18  10.00  91.82  1,187,768.64 


6061+080.00  4.59  9.18  10.00  91.82  1,187,676.82 
6061+100.00  4.59  9.18  10.00  91.82  1,187,585.00 
6061+120.00  4.59  9.18  10.00  91.82  1,187,493.18 
6061+140.00  4.59  9.18  10.00  91.82  1,187,401.36 
6061+160.00  4.59  9.18  10.00  91.82  1,187,309.54 
6061+180.00  4.59  9.18  10.00  91.82  1,187,217.72 
6061+200.00  4.59  9.18  10.00  91.82  1,187,125.90 
6061+220.00  4.59  9.18  10.00  91.82  1,187,034.08 
6061+240.00  4.59  9.18  10.00  91.82  1,186,942.26 
6061+260.00  4.59  9.18  10.00  91.82  1,186,850.44 
6061+280.00  4.59  9.18  10.00  91.82  1,186,758.62 
6061+300.00  4.59  9.18  10.00  91.82  1,186,666.80 
6061+320.00  4.59  9.18  10.00  91.82  1,186,574.98 
6061+340.00  4.59  9.18  10.00  91.82  1,186,483.16 
6061+360.00  4.59  9.18  10.00  91.82  1,186,391.34 
6061+380.00  4.59  9.18  10.00  91.82  1,186,299.52 
6061+400.00  4.59  9.18  10.00  91.82  1,186,207.70 
6061+420.00  4.59  9.18  10.00  91.82  1,186,115.88 
6061+440.00  4.59  9.18  10.00  91.82  1,186,024.06 
6061+460.00  4.59  9.18  10.00  91.82  1,185,932.24 
6061+480.00  4.59  9.18  10.00  91.82  1,185,840.42 
6061+500.00  4.59  9.18  10.00  91.82  1,185,748.60 
6061+520.00  4.59  9.18  10.00  91.82  1,185,656.78 
6061+540.00  4.59  9.18  10.00  91.82  1,185,564.96 
6061+560.00  4.59  9.18  10.00  91.82  1,185,473.14 
6061+580.00  4.59  9.18  10.00  91.82  1,185,381.32 
6061+600.00  4.59  9.18  10.00  91.82  1,185,289.50 
6061+620.00  4.59  9.18  10.00  91.82  1,185,197.68 
6061+640.00  4.59  9.18  10.00  91.82  1,185,105.86 
6061+660.00  4.59  9.18  10.00  91.82  1,185,014.04 
6061+680.00  4.59  9.18  10.00  91.82  1,184,922.22 
6061+700.00  4.59  9.18  10.00  91.82  1,184,830.40 
6061+720.00  4.59  9.18  10.00  91.82  1,184,738.58 
6061+740.00  4.59  9.18  10.00  91.82  1,184,646.76 
6061+760.00  4.59  9.18  10.00  91.82  1,184,554.94 
6061+780.00  4.59  9.18  10.00  91.82  1,184,463.12 
6061+800.00  4.59  9.18  10.00  91.82  1,184,371.30 
6061+820.00  4.59  9.18  10.00  91.82  1,184,279.48 
6061+840.00  4.59  9.18  10.00  91.82  1,184,187.66 
6061+860.00  4.59  9.18  10.00  91.82  1,184,095.84 
6061+880.00  4.59  9.18  10.00  91.82  1,184,004.02 
6061+900.00  4.59  9.18  10.00  91.82  1,183,912.20 
6061+920.00  4.59  9.18  10.00  91.82  1,183,820.38 
6061+940.00  4.59  9.18  10.00  91.82  1,183,728.56 

707 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6061+960.00  4.59  9.18  10.00  91.82  1,183,636.74 


6061+980.00  4.59  9.18  10.00  91.82  1,183,544.92 
6062+000.00  4.59  9.18  10.00  91.82  1,183,453.10 
6062+020.00  4.59  9.18  10.00  91.82  1,183,361.28 
6062+040.00  4.59  9.18  10.00  91.82  1,183,269.46 
6062+060.00  4.59  9.18  10.00  91.82  1,183,177.64 
6062+080.00  4.59  9.18  10.00  91.82  1,183,085.82 
6062+100.00  4.59  9.18  10.00  91.82  1,182,994.00 
6062+120.00  4.59  9.18  10.00  91.82  1,182,902.18 
6062+140.00  4.59  9.18  10.00  91.82  1,182,810.36 
6062+160.00  4.59  9.18  10.00  91.82  1,182,718.54 
6062+180.00  4.59  9.18  10.00  91.82  1,182,626.72 
6062+200.00  4.59  9.18  10.00  91.82  1,182,534.90 
6062+220.00  4.59  9.18  10.00  91.82  1,182,443.08 
6062+240.00  4.59  9.18  10.00  91.82  1,182,351.26 
6062+260.00  4.59  9.18  10.00  91.82  1,182,259.44 
6062+280.00  4.59  9.18  10.00  91.82  1,182,167.62 
6062+300.00  4.59  9.18  10.00  91.82  1,182,075.80 
6062+320.00  4.59  9.18  10.00  91.82  1,181,983.98 
6062+340.00  4.59  9.18  10.00  91.82  1,181,892.16 
6062+360.00  4.59  9.18  10.00  91.82  1,181,800.34 
6062+380.00  4.59  9.18  10.00  91.82  1,181,708.52 
6062+400.00  4.59  9.18  10.00  91.82  1,181,616.70 
6062+420.00  4.59  9.18  10.00  91.82  1,181,524.88 
6062+440.00  4.59  9.18  10.00  91.81  1,181,433.07 
6062+460.00  4.59  9.18  10.00  91.81  1,181,341.26 
6062+480.00  4.59  9.18  10.00  91.81  1,181,249.45 
6062+500.00  4.59  9.18  10.00  91.81  1,181,157.64 
6062+520.00  4.59  9.18  10.00  91.81  1,181,065.83 
6062+540.00  4.59  9.18  10.00  91.81  1,180,974.02 
6062+560.00  4.59  9.18  10.00  91.82  1,180,882.20 
6062+580.00  4.59  9.18  10.00  91.81  1,180,790.39 
6062+600.00  4.59  9.18  10.00  91.80  1,180,698.59 
6062+620.00  4.59  9.18  10.00  91.81  1,180,606.78 
6062+640.00  4.59  9.18  10.00  91.82  1,180,514.96 
6062+660.00  4.59  9.18  10.00  91.82  1,180,423.14 
6062+680.00  4.59  9.18  10.00  91.82  1,180,331.32 
6062+700.00  4.59  9.18  10.00  91.82  1,180,239.50 
6062+720.00  4.59  9.18  10.00  91.82  1,180,147.68 
6062+740.00  4.59  9.18  10.00  91.81  1,180,055.87 
6062+760.00  4.59  9.18  10.00  91.81  1,179,964.06 
6062+780.00  4.59  9.18  10.00  91.81  1,179,872.25 
6062+800.00  4.59  9.18  10.00  91.81  1,179,780.44 
6062+820.00  4.59  9.18  10.00  91.82  1,179,688.62 
6062+840.00  4.59  9.18  10.00  91.82  1,179,596.80 

708 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6062+860.00  4.59  9.18  10.00  91.82  1,179,504.98 


6062+880.00  4.59  9.18  10.00  91.82  1,179,413.16 
6062+900.00  4.59  9.18  10.00  91.82  1,179,321.34 
6062+920.00  4.59  9.18  10.00  91.82  1,179,229.52 
6062+940.00  4.59  9.18  10.00  91.82  1,179,137.70 
6062+960.00  4.59  9.18  10.00  91.82  1,179,045.88 
6062+980.00  4.59  9.18  10.00  91.82  1,178,954.06 
6063+000.00  4.59  9.18  10.00  91.82  1,178,862.24 
6063+020.00  4.59  9.18  10.00  91.82  1,178,770.42 
6063+040.00  4.59  9.18  10.00  91.82  1,178,678.60 
6063+060.00  4.59  9.18  10.00  91.82  1,178,586.78 
6063+080.00  4.59  9.18  10.00  91.82  1,178,494.96 
6063+100.00  4.59  9.18  10.00  91.82  1,178,403.14 
6063+120.00  4.59  9.18  10.00  91.82  1,178,311.32 
6063+140.00  4.59  9.18  10.00  91.82  1,178,219.50 
6063+160.00  4.59  9.18  10.00  91.82  1,178,127.68 
6063+180.00  4.59  9.18  10.00  91.82  1,178,035.86 
6063+200.00  4.59  9.18  10.00  91.82  1,177,944.04 
6063+220.00  4.59  9.18  10.00  91.82  1,177,852.22 
6063+240.00  4.59  9.18  10.00  91.82  1,177,760.40 
6063+260.00  4.59  9.18  10.00  91.82  1,177,668.58 
6063+280.00  4.59  9.18  10.00  91.82  1,177,576.76 
6063+300.00  4.59  9.18  10.00  91.82  1,177,484.94 
6063+320.00  4.59  9.18  10.00  91.82  1,177,393.12 
6063+340.00  4.59  9.18  10.00  91.82  1,177,301.30 
6063+360.00  4.59  9.18  10.00  91.82  1,177,209.48 
6063+380.00  4.59  9.18  10.00  91.82  1,177,117.66 
6063+400.00  4.59  9.18  10.00  91.82  1,177,025.84 
6063+420.00  4.59  9.18  10.00  91.82  1,176,934.02 
6063+440.00  4.59  9.18  10.00  91.82  1,176,842.20 
6063+460.00  4.59  9.18  10.00  91.82  1,176,750.38 
6063+480.00  4.59  9.18  10.00  91.82  1,176,658.56 
6063+500.00  4.59  9.18  10.00  91.82  1,176,566.74 
6063+520.00  4.59  9.18  10.00  91.82  1,176,474.92 
6063+540.00  4.59  9.18  10.00  91.82  1,176,383.10 
6063+560.00  4.59  9.18  10.00  91.82  1,176,291.28 
6063+580.00  4.59  9.18  10.00  91.82  1,176,199.46 
6063+600.00  4.59  9.18  10.00  91.82  1,176,107.64 
6063+620.00  4.59  9.18  10.00  91.82  1,176,015.82 
6063+640.00  4.59  9.18  10.00  91.82  1,175,924.00 
6063+660.00  4.59  9.18  10.00  91.82  1,175,832.18 
6063+680.00  4.59  9.18  10.00  91.82  1,175,740.36 
6063+700.00  4.59  9.18  10.00  91.82  1,175,648.54 
6063+720.00  4.59  9.18  10.00  91.82  1,175,556.72 
6063+740.00  4.59  9.18  10.00  91.82  1,175,464.90 

709 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6063+760.00  4.59  9.18  10.00  91.82  1,175,373.08 


6063+780.00  4.59  9.18  10.00  91.82  1,175,281.26 
6063+800.00  4.59  9.18  10.00  91.82  1,175,189.44 
6063+820.00  4.59  9.18  10.00  91.82  1,175,097.62 
6063+840.00  4.59  9.18  10.00  91.82  1,175,005.80 
6063+860.00  4.59  9.18  10.00  91.82  1,174,913.98 
6063+880.00  4.59  9.18  10.00  91.82  1,174,822.16 
6063+900.00  4.59  9.18  10.00  91.82  1,174,730.34 
6063+920.00  4.59  9.18  10.00  91.82  1,174,638.52 
6063+940.00  4.59  9.18  10.00  91.82  1,174,546.70 
6063+960.00  4.59  9.18  10.00  91.82  1,174,454.88 
6063+980.00  4.59  9.18  10.00  91.82  1,174,363.06 
6064+000.00  4.59  9.18  10.00  91.82  1,174,271.24 
6064+020.00  4.59  9.18  10.00  91.82  1,174,179.42 
6064+040.00  4.59  9.18  10.00  91.82  1,174,087.60 
6064+060.00  4.59  9.18  10.00  91.82  1,173,995.78 
6064+080.00  4.59  9.18  10.00  91.81  1,173,903.97 
6064+100.00  4.59  9.18  10.00  91.80  1,173,812.17 
6064+120.00  4.59  9.18  10.00  91.81  1,173,720.36 
6064+140.00  4.59  9.18  10.00  91.82  1,173,628.54 
6064+160.00  4.59  9.18  10.00  91.82  1,173,536.72 
6064+180.00  4.59  9.18  10.00  91.82  1,173,444.90 
6064+200.00  4.59  9.18  10.00  91.82  1,173,353.08 
6064+220.00  4.59  9.18  10.00  91.81  1,173,261.27 
6064+240.00  4.59  9.18  10.00  91.81  1,173,169.46 
6064+260.00  4.59  9.18  10.00  91.82  1,173,077.64 
6064+280.00  4.59  9.18  10.00  91.81  1,172,985.83 
6064+300.00  4.59  9.18  10.00  91.81  1,172,894.02 
6064+320.00  4.59  9.18  10.00  91.82  1,172,802.20 
6064+340.00  4.59  9.18  10.00  91.82  1,172,710.38 
6064+360.00  4.59  9.18  10.00  91.82  1,172,618.56 
6064+380.00  4.59  9.18  10.00  91.81  1,172,526.75 
6064+400.00  4.59  9.18  10.00  91.81  1,172,434.94 
6064+420.00  4.59  9.18  10.00  91.82  1,172,343.12 
6064+440.00  4.59  9.18  10.00  91.82  1,172,251.30 
6064+460.00  4.59  9.18  10.00  91.82  1,172,159.48 
6064+480.00  4.59  9.18  10.00  91.82  1,172,067.66 
6064+500.00  4.59  9.18  10.00  91.82  1,171,975.84 
6064+520.00  4.59  9.18  10.00  91.81  1,171,884.03 
6064+540.00  4.59  9.18  10.00  91.81  1,171,792.22 
6064+560.00  4.59  9.18  10.00  91.82  1,171,700.40 
6064+580.00  4.59  9.18  10.00  91.82  1,171,608.58 
6064+600.00  4.59  9.18  10.00  91.82  1,171,516.76 
6064+620.00  4.59  9.18  10.00  91.82  1,171,424.94 
6064+640.00  4.59  9.18  10.00  91.82  1,171,333.12 

710 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6064+660.00  4.59  9.18  10.00  91.82  1,171,241.30 


6064+680.00  4.59  9.18  10.00  91.81  1,171,149.49 
6064+700.00  4.59  9.18  10.00  91.80  1,171,057.69 
6064+720.00  4.59  9.18  10.00  91.80  1,170,965.89 
6064+740.00  4.59  9.18  10.00  91.80  1,170,874.09 
6064+760.00  4.59  9.18  10.00  91.81  1,170,782.28 
6064+780.00  4.59  9.18  10.00  91.82  1,170,690.46 
6064+800.00  4.59  9.18  10.00  91.82  1,170,598.64 
6064+820.00  4.59  9.18  10.00  91.82  1,170,506.82 
6064+840.00  4.59  9.18  10.00  91.82  1,170,415.00 
6064+860.00  4.59  9.18  10.00  91.82  1,170,323.18 
6064+880.00  4.59  9.18  10.00  91.82  1,170,231.36 
6064+900.00  4.59  9.18  10.00  91.82  1,170,139.54 
6064+920.00  4.59  9.18  10.00  91.82  1,170,047.72 
6064+940.00  4.59  9.18  10.00  91.82  1,169,955.90 
6064+960.00  4.59  9.18  10.00  91.82  1,169,864.08 
6064+980.00  4.59  9.18  10.00  91.82  1,169,772.26 
6065+000.00  4.59  9.18  10.00  91.82  1,169,680.44 
6065+020.00  4.59  9.18  10.00  91.82  1,169,588.62 
6065+040.00  4.59  9.18  10.00  91.82  1,169,496.80 
6065+060.00  4.59  9.18  10.00  91.82  1,169,404.98 
6065+080.00  4.59  9.18  10.00  91.82  1,169,313.16 
6065+100.00  4.59  9.18  10.00  91.82  1,169,221.34 
6065+120.00  4.59  9.18  10.00  91.82  1,169,129.52 
6065+140.00  4.59  9.18  10.00  91.82  1,169,037.70 
6065+160.00  4.59  9.18  10.00  91.82  1,168,945.88 
6065+180.00  4.59  9.18  10.00  91.82  1,168,854.06 
6065+200.00  4.59  9.18  10.00  91.82  1,168,762.24 
6065+220.00  4.59  9.18  10.00  91.82  1,168,670.42 
6065+240.00  4.59  9.18  10.00  91.82  1,168,578.60 
6065+260.00  4.59  9.18  10.00  91.82  1,168,486.78 
6065+280.00  4.59  9.18  10.00  91.82  1,168,394.96 
6065+300.00  4.59  9.18  10.00  91.82  1,168,303.14 
6065+320.00  4.59  9.18  10.00  91.82  1,168,211.32 
6065+340.00  4.59  9.18  10.00  91.82  1,168,119.50 
6065+360.00  4.59  9.18  10.00  91.82  1,168,027.68 
6065+380.00  4.59  9.18  10.00  91.82  1,167,935.86 
6065+400.00  4.59  9.18  10.00  91.82  1,167,844.04 
6065+420.00  4.59  9.18  10.00  91.82  1,167,752.22 
6065+440.00  4.59  9.18  10.00  91.82  1,167,660.40 
6065+460.00  4.59  9.18  10.00  91.82  1,167,568.58 
6065+480.00  4.59  9.18  10.00  91.82  1,167,476.76 
6065+500.00  4.59  9.18  10.00  91.82  1,167,384.94 
6065+520.00  4.59  9.18  10.00  91.81  1,167,293.13 
6065+540.00  4.59  9.18  10.00  91.80  1,167,201.33 

711 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6065+560.00  4.59  9.18  10.00  91.81  1,167,109.52 


6065+560.00  4.59  9.18  0.00  0.00  1,167,109.52 
6065+580.00  4.59  9.18  10.00  91.82  1,167,017.70 
6065+600.00  4.59  9.18  10.00  91.82  1,166,925.88 
6065+620.00  4.59  9.18  10.00  91.82  1,166,834.06 
6065+640.00  4.59  9.18  10.00  91.82  1,166,742.24 
6065+660.00  4.59  9.18  10.00  91.82  1,166,650.42 
6065+680.00  4.59  9.18  10.00  91.82  1,166,558.60 
6065+700.00  4.59  9.18  10.00  91.82  1,166,466.78 
6065+710.00  4.59  9.18  5.00  45.91  1,166,420.87 
6065+710.00  4.59  9.18  0.00  0.00  1,166,420.87 
6065+720.00  4.59  9.18  5.00  45.91  1,166,374.97 
6065+740.00  4.59  9.18  10.00  91.82  1,166,283.15 
6065+760.00  4.59  9.18  10.00  91.82  1,166,191.33 
6065+780.00  4.59  9.18  10.00  91.82  1,166,099.51 
6065+800.00  4.59  9.18  10.00  91.82  1,166,007.69 
6065+820.00  4.59  9.18  10.00  91.82  1,165,915.87 
6065+840.00  4.59  9.18  10.00  91.81  1,165,824.06 
6065+860.00  4.59  9.18  10.00  91.81  1,165,732.25 
6065+880.00  4.59  9.18  10.00  91.82  1,165,640.43 
6065+900.00  4.59  9.18  10.00  91.82  1,165,548.61 
6065+920.00  4.59  9.18  10.00  91.82  1,165,456.79 
6065+940.00  4.59  9.18  10.00  91.82  1,165,364.97 
6065+960.00  4.59  9.18  10.00  91.82  1,165,273.15 
6065+980.00  4.59  9.18  10.00  91.82  1,165,181.33 
6066+000.00  4.59  9.18  10.00  91.82  1,165,089.51 
6066+020.00  4.59  9.18  10.00  91.82  1,164,997.69 
6066+040.00  4.59  9.18  10.00  91.82  1,164,905.87 
6066+060.00  4.59  9.18  10.00  91.82  1,164,814.05 
6066+080.00  4.59  9.18  10.00  91.82  1,164,722.23 
6066+100.00  4.59  9.18  10.00  91.82  1,164,630.41 
6066+120.00  4.59  9.18  10.00  91.82  1,164,538.59 
6066+140.00  4.59  9.18  10.00  91.82  1,164,446.77 
6066+160.00  4.59  9.18  10.00  91.82  1,164,354.95 
6066+180.00  4.59  9.18  10.00  91.82  1,164,263.13 
6066+200.00  4.59  9.18  10.00  91.82  1,164,171.31 
6066+220.00  4.59  9.18  10.00  91.82  1,164,079.49 
6066+240.00  4.59  9.18  10.00  91.82  1,163,987.67 
6066+260.00  4.59  9.18  10.00  91.82  1,163,895.85 
6066+280.00  4.59  9.18  10.00  91.82  1,163,804.03 
6066+300.00  4.59  9.18  10.00  91.82  1,163,712.21 
6066+320.00  4.59  9.18  10.00  91.82  1,163,620.39 
6066+340.00  4.59  9.18  10.00  91.82  1,163,528.57 
6066+360.00  4.59  9.18  10.00  91.82  1,163,436.75 
6066+380.00  4.59  9.18  10.00  91.82  1,163,344.93 

712 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6066+400.00  4.59  9.18  10.00  91.82  1,163,253.11 


6066+420.00  4.59  9.18  10.00  91.82  1,163,161.29 
6066+440.00  4.59  9.18  10.00  91.82  1,163,069.47 
6066+460.00  4.59  9.18  10.00  91.82  1,162,977.65 
6066+480.00  4.59  9.18  10.00  91.82  1,162,885.83 
6066+500.00  4.59  9.18  10.00  91.82  1,162,794.01 
6066+520.00  4.59  9.18  10.00  91.82  1,162,702.19 
6066+540.00  4.59  9.18  10.00  91.82  1,162,610.37 
6066+560.00  4.59  9.18  10.00  91.82  1,162,518.55 
6066+580.00  4.59  9.18  10.00  91.82  1,162,426.73 
6066+600.00  4.59  9.18  10.00  91.82  1,162,334.91 
6066+620.00  4.59  9.18  10.00  91.82  1,162,243.09 
6066+640.00  4.59  9.18  10.00  91.82  1,162,151.27 
6066+660.00  4.59  9.18  10.00  91.82  1,162,059.45 
6066+680.00  4.59  9.18  10.00  91.82  1,161,967.63 
6066+700.00  4.59  9.18  10.00  91.82  1,161,875.81 
6066+720.00  4.59  9.18  10.00  91.82  1,161,783.99 
6066+740.00  4.59  9.18  10.00  91.82  1,161,692.17 
6066+760.00  4.59  9.18  10.00  91.82  1,161,600.35 
6066+780.00  4.59  9.18  10.00  91.82  1,161,508.53 
6066+800.00  4.59  9.18  10.00  91.82  1,161,416.71 
6066+820.00  4.59  9.18  10.00  91.82  1,161,324.89 
6066+840.00  4.59  9.18  10.00  91.82  1,161,233.07 
6066+860.00  4.59  9.18  10.00  91.82  1,161,141.25 
6066+880.00  4.59  9.18  10.00  91.82  1,161,049.43 
6066+900.00  4.59  9.18  10.00  91.82  1,160,957.61 
6066+920.00  4.59  9.18  10.00  91.82  1,160,865.79 
6066+940.00  4.59  9.18  10.00  91.82  1,160,773.97 
6066+960.00  4.59  9.18  10.00  91.82  1,160,682.15 
6066+980.00  4.59  9.18  10.00  91.82  1,160,590.33 
6067+000.00  4.59  9.18  10.00  91.82  1,160,498.51 
 

TABLA 53 CÁLCULO DE ACARREOS DE BALASTO DEL LADERO 6040+000 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

0+000.00  0.00  0.00        1,300,000.00 


0+000.00  0.00  0.00  0.00  0.00  1,300,000.00 
0+000.60  0.00  0.00  0.30  0.00  1,300,000.00 
0+007.13  0.01  0.02  3.27  0.05  1,299,999.95 
0+007.35  0.01  0.03  0.11  0.00  1,299,999.95 

713 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

0+015.89  0.06  0.07  4.27  0.32  1,299,999.63 


0+017.35  0.07  0.13  0.73  0.10  1,299,999.54 
0+020.00  0.09  0.17  1.33  0.22  1,299,999.32 
0+024.02  0.14  0.23  2.01  0.46  1,299,998.86 
0+027.35  0.18  0.31  1.66  0.52  1,299,998.34 
0+031.60  0.23  0.41  2.12  0.87  1,299,997.47 
0+037.35  0.33  0.56  2.88  1.62  1,299,995.85 
0+038.71  0.35  0.68  0.68  0.46  1,299,995.39 
0+040.00  0.38  0.73  0.64  0.47  1,299,994.92 
0+041.65  0.41  0.79  0.82  0.65  1,299,994.27 
0+045.16  0.48  0.89  1.76  1.56  1,299,992.71 
0+047.36  0.53  1.01  1.10  1.11  1,299,991.60 
0+051.07  0.62  1.15  1.85  2.13  1,299,989.47 
0+055.87  0.74  1.36  2.40  3.27  1,299,986.21 
0+056.56  0.76  1.50  0.35  0.52  1,299,985.69 
0+057.37  0.78  1.55  0.41  0.63  1,299,985.06 
0+059.92  0.86  1.64  1.27  2.09  1,299,982.97 
0+060.00  0.86  1.72  0.04  0.07  1,299,982.90 
0+061.06  0.89  1.75  0.53  0.93  1,299,981.97 
0+064.02  0.98  1.87  1.48  2.76  1,299,979.21 
0+066.12  1.04  2.02  1.05  2.12  1,299,977.09 
0+067.38  1.08  2.12  0.63  1.33  1,299,975.76 
0+072.39  1.23  2.30  2.50  5.77  1,299,969.99 
0+077.39  1.38  2.61  2.50  6.52  1,299,963.47 
0+078.66  1.42  2.79  0.63  1.76  1,299,961.71 
0+080.00  1.46  2.87  0.67  1.93  1,299,959.77 
0+080.77  1.48  2.94  0.38  1.12  1,299,958.65 
0+086.74  1.66  3.14  2.99  9.39  1,299,949.26 
0+087.41  1.68  3.35  0.33  1.11  1,299,948.15 
0+095.90  1.95  3.63  4.25  15.42  1,299,932.73 
0+097.42  1.99  3.94  0.76  2.99  1,299,929.74 
0+100.00  2.07  4.07  1.29  5.25  1,299,924.49 
0+100.17  2.08  4.15  0.08  0.35  1,299,924.14 
0+105.22  2.21  4.29  2.53  10.84  1,299,913.30 
0+107.43  2.26  4.48  1.11  4.95  1,299,908.35 
0+114.74  2.40  4.66  3.65  17.02  1,299,891.33 
0+117.44  2.43  4.83  1.35  6.51  1,299,884.82 
0+120.00  2.46  4.90  1.28  6.27  1,299,878.54 
0+124.40  2.51  4.97  2.20  10.93  1,299,867.61 
0+127.44  2.53  5.04  1.52  7.66  1,299,859.95 
0+134.17  2.57  5.10  3.36  17.16  1,299,842.79 
0+137.45  2.58  5.15  1.64  8.44  1,299,834.35 
0+140.00  2.59  5.17  1.28  6.61  1,299,827.74 
0+144.03  2.60  5.19  2.02  10.46  1,299,817.28 
0+147.45  2.61  5.21  1.71  8.89  1,299,808.38 

714 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

0+153.97  2.62  5.22  3.26  17.04  1,299,791.34 


0+157.45  2.62  5.23  1.74  9.09  1,299,782.25 
0+160.00  2.62  5.23  1.28  6.68  1,299,775.57 
0+160.09  2.62  5.23  0.04  0.22  1,299,775.35 
0+163.98  2.62  5.23  1.95  10.20  1,299,765.15 
0+167.45  2.62  5.24  1.73  9.07  1,299,756.08 
0+173.98  2.62  5.24  3.27  17.11  1,299,738.97 
0+177.45  2.62  5.24  1.73  9.06  1,299,729.91 
0+180.00  2.62  5.23  1.28  6.68  1,299,723.22 
0+190.52  2.62  5.23  5.26  27.52  1,299,695.71 
0+197.45  2.62  5.23  3.46  18.12  1,299,677.59 
0+200.00  2.62  5.23  1.28  6.68  1,299,670.91 
0+210.52  2.61  5.23  5.26  27.51  1,299,643.40 
0+217.45  2.62  5.23  3.46  18.11  1,299,625.28 
0+220.00  2.62  5.23  1.28  6.68  1,299,618.60 
0+230.52  2.61  5.23  5.26  27.51  1,299,591.09 
0+237.45  2.62  5.23  3.46  18.11  1,299,572.97 
0+240.00  2.62  5.23  1.28  6.68  1,299,566.29 
0+250.52  2.62  5.23  5.26  27.52  1,299,538.78 
0+257.45  2.62  5.23  3.46  18.12  1,299,520.66 
0+260.00  2.62  5.23  1.28  6.68  1,299,513.98 
0+270.52  2.61  5.23  5.26  27.51  1,299,486.47 
0+277.45  2.62  5.23  3.46  18.11  1,299,468.35 
0+280.00  2.62  5.23  1.28  6.68  1,299,461.67 
0+290.52  2.61  5.23  5.26  27.51  1,299,434.16 
0+297.45  2.62  5.23  3.46  18.11  1,299,416.04 
0+300.00  2.62  5.23  1.28  6.68  1,299,409.36 
0+310.52  2.62  5.23  5.26  27.53  1,299,381.83 
0+317.45  2.62  5.23  3.46  18.13  1,299,363.70 
0+320.00  2.62  5.23  1.28  6.68  1,299,357.02 
0+330.52  2.62  5.23  5.26  27.53  1,299,329.49 
0+337.45  2.62  5.23  3.46  18.13  1,299,311.36 
0+340.00  2.62  5.23  1.28  6.68  1,299,304.68 
0+350.52  2.62  5.23  5.26  27.53  1,299,277.15 
0+357.45  2.62  5.23  3.46  18.13  1,299,259.02 
0+360.00  2.62  5.23  1.28  6.68  1,299,252.34 
0+370.52  2.62  5.23  5.26  27.53  1,299,224.81 
0+377.45  2.62  5.23  3.46  18.13  1,299,206.68 
0+380.00  2.62  5.23  1.28  6.68  1,299,200.00 
0+390.52  2.62  5.23  5.26  27.53  1,299,172.47 
0+397.45  2.62  5.23  3.46  18.13  1,299,154.34 
0+400.00  2.62  5.23  1.28  6.68  1,299,147.66 
0+410.52  2.62  5.23  5.26  27.53  1,299,120.13 
0+417.45  2.62  5.23  3.46  18.13  1,299,102.00 
0+420.00  2.62  5.23  1.28  6.68  1,299,095.32 

715 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

0+430.52  2.62  5.23  5.26  27.53  1,299,067.79 


0+437.45  2.62  5.23  3.46  18.13  1,299,049.66 
0+440.00  2.62  5.23  1.28  6.68  1,299,042.98 
0+450.52  2.62  5.23  5.26  27.53  1,299,015.45 
0+457.45  2.62  5.23  3.46  18.13  1,298,997.32 
0+460.00  2.62  5.23  1.28  6.68  1,298,990.64 
0+470.52  2.62  5.23  5.26  27.53  1,298,963.11 
0+477.45  2.62  5.23  3.46  18.13  1,298,944.98 
0+480.00  2.62  5.23  1.28  6.68  1,298,938.30 
0+490.52  2.62  5.23  5.26  27.53  1,298,910.77 
0+497.45  2.62  5.23  3.46  18.13  1,298,892.64 
0+500.00  2.62  5.23  1.28  6.68  1,298,885.96 
0+510.52  2.62  5.23  5.26  27.53  1,298,858.43 
0+517.45  2.62  5.23  3.46  18.13  1,298,840.30 
0+520.00  2.62  5.23  1.28  6.68  1,298,833.62 
0+530.52  2.62  5.23  5.26  27.53  1,298,806.09 
0+537.45  2.62  5.23  3.46  18.13  1,298,787.96 
0+540.00  2.62  5.23  1.28  6.68  1,298,781.28 
0+550.52  2.62  5.23  5.26  27.53  1,298,753.75 
0+557.45  2.62  5.23  3.46  18.13  1,298,735.62 
0+560.00  2.62  5.23  1.28  6.68  1,298,728.94 
0+570.52  2.62  5.23  5.26  27.53  1,298,701.41 
0+577.45  2.62  5.23  3.46  18.13  1,298,683.28 
0+580.00  2.62  5.23  1.28  6.68  1,298,676.60 
0+586.19  2.62  5.23  3.09  16.19  1,298,660.41 
0+590.82  2.62  5.23  2.32  12.12  1,298,648.29 
0+590.94  2.62  5.23  0.06  0.33  1,298,647.96 
0+595.15  2.62  5.23  2.10  11.00  1,298,636.96 
0+597.45  2.62  5.24  1.15  6.02  1,298,630.94 
0+600.00  2.62  5.24  1.28  6.69  1,298,624.26 
0+610.49  2.62  5.24  5.24  27.44  1,298,596.81 
0+617.44  2.62  5.24  3.48  18.19  1,298,578.62 
0+620.00  2.62  5.24  1.28  6.71  1,298,571.91 
0+630.45  2.62  5.24  5.23  27.36  1,298,544.54 
0+637.42  2.62  5.24  3.48  18.23  1,298,526.31 
0+640.00  2.62  5.24  1.29  6.77  1,298,519.55 
0+650.41  2.62  5.24  5.20  27.24  1,298,492.31 
0+657.38  2.62  5.24  3.49  18.27  1,298,474.04 
0+660.00  2.62  5.24  1.31  6.85  1,298,467.19 
0+670.35  2.62  5.24  5.17  27.09  1,298,440.10 
0+677.34  2.62  5.24  3.50  18.30  1,298,421.79 
0+680.00  2.62  5.24  1.33  6.97  1,298,414.82 
0+690.28  2.62  5.24  5.14  26.91  1,298,387.92 
0+697.28  2.62  5.24  3.50  18.34  1,298,369.58 
0+700.00  2.62  5.24  1.36  7.11  1,298,362.47 

716 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

0+710.20  2.62  5.24  5.10  26.70  1,298,335.76 


0+717.22  2.62  5.24  3.51  18.37  1,298,317.39 
0+720.00  2.62  5.24  1.39  7.29  1,298,310.11 
0+730.11  2.62  5.24  5.05  26.46  1,298,283.65 
0+737.14  2.62  5.24  3.52  18.41  1,298,265.24 
0+739.30  2.62  5.24  1.08  5.66  1,298,259.58 
0+740.00  2.62  5.24  0.35  1.83  1,298,257.74 
0+740.50  2.62  5.24  0.25  1.30  1,298,256.44 
0+740.69  2.62  5.24  0.10  0.51  1,298,255.93 
0+751.19  2.62  5.24  5.25  27.50  1,298,228.43 
0+757.05  2.62  5.24  2.93  15.35  1,298,213.08 
0+760.00  2.62  5.24  1.47  7.72  1,298,205.36 
0+769.94  2.62  5.24  4.97  26.02  1,298,179.34 
0+776.97  2.62  5.24  3.51  18.40  1,298,160.94 
0+780.00  2.62  5.24  1.52  7.94  1,298,153.00 
0+789.86  2.62  5.24  4.93  25.80  1,298,127.20 
0+796.88  2.62  5.24  3.51  18.40  1,298,108.80 
0+800.00  2.62  5.24  1.56  8.17  1,298,100.64 
0+809.77  2.62  5.24  4.88  25.57  1,298,075.06 
0+816.80  2.62  5.24  3.51  18.40  1,298,056.66 
0+820.00  2.62  5.24  1.60  8.39  1,298,048.28 
0+829.69  2.62  5.24  4.84  25.35  1,298,022.92 
0+836.71  2.62  5.24  3.51  18.40  1,298,004.53 
0+840.00  2.62  5.24  1.64  8.61  1,297,995.91 
0+849.60  2.62  5.24  4.80  25.13  1,297,970.79 
0+856.63  2.62  5.24  3.51  18.40  1,297,952.39 
0+860.00  2.62  5.24  1.69  8.84  1,297,943.55 
0+869.51  2.62  5.24  4.76  24.90  1,297,918.65 
0+876.54  2.62  5.24  3.51  18.40  1,297,900.25 
0+880.00  2.62  5.24  1.73  9.06  1,297,891.19 
0+889.43  2.62  5.24  4.71  24.68  1,297,866.51 
0+896.45  2.62  5.24  3.51  18.40  1,297,848.11 
0+900.00  2.62  5.24  1.77  9.29  1,297,838.83 
0+909.34  2.62  5.24  4.67  24.45  1,297,814.37 
0+916.37  2.62  5.24  3.51  18.40  1,297,795.98 
0+920.00  2.62  5.24  1.82  9.51  1,297,786.46 
0+929.26  2.62  5.24  4.63  24.23  1,297,762.24 
0+936.28  2.62  5.24  3.51  18.40  1,297,743.84 
0+940.00  2.62  5.24  1.86  9.74  1,297,734.10 
0+949.17  2.62  5.24  4.58  24.00  1,297,710.10 
0+956.20  2.62  5.24  3.51  18.40  1,297,691.70 
0+960.00  2.62  5.24  1.90  9.96  1,297,681.74 
0+969.09  2.62  5.24  4.54  23.78  1,297,657.96 
0+976.11  2.62  5.24  3.51  18.40  1,297,639.56 
0+980.00  2.62  5.24  1.94  10.19  1,297,629.38 

717 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

0+989.00  2.62  5.24  4.50  23.55  1,297,605.82 


0+996.03  2.62  5.24  3.51  18.40  1,297,587.42 
1+000.00  2.62  5.24  1.99  10.41  1,297,577.01 
1+008.91  2.62  5.24  4.46  23.33  1,297,553.68 
1+015.94  2.62  5.24  3.51  18.40  1,297,535.29 
1+020.00  2.62  5.24  2.03  10.64  1,297,524.65 
1+028.83  2.62  5.24  4.41  23.11  1,297,501.54 
1+035.85  2.62  5.24  3.51  18.40  1,297,483.15 
1+036.80  2.62  5.24  0.47  2.48  1,297,480.66 
1+037.13  2.62  5.24  0.16  0.86  1,297,479.80 
1+037.33  2.62  5.24  0.10  0.51  1,297,479.29 
1+040.00  2.62  5.24  1.34  7.00  1,297,472.28 
1+049.28  2.62  5.24  4.64  24.29  1,297,447.99 
1+055.77  2.62  5.24  3.25  17.02  1,297,430.98 
1+060.00  2.62  5.24  2.11  11.07  1,297,419.91 
1+068.71  2.62  5.24  4.36  22.80  1,297,397.11 
1+075.70  2.62  5.24  3.50  18.31  1,297,378.80 
1+080.00  2.62  5.24  2.15  11.25  1,297,367.55 
1+088.67  2.62  5.24  4.33  22.69  1,297,344.86 
1+095.65  2.62  5.24  3.49  18.27  1,297,326.60 
1+100.00  2.62  5.24  2.18  11.40  1,297,315.19 
1+108.63  2.62  5.24  4.32  22.60  1,297,292.59 
1+115.60  2.62  5.24  3.48  18.24  1,297,274.35 
1+120.00  2.62  5.24  2.20  11.52  1,297,262.83 
1+128.61  2.62  5.24  4.31  22.55  1,297,240.28 
1+135.56  2.62  5.24  3.48  18.20  1,297,222.08 
1+140.00  2.62  5.24  2.22  11.62  1,297,210.46 
1+148.60  2.62  5.24  4.30  22.51  1,297,187.95 
1+155.54  2.62  5.24  3.47  18.16  1,297,169.79 
1+160.00  2.62  5.24  2.23  11.68  1,297,158.11 
1+168.60  2.62  5.24  4.30  22.52  1,297,135.59 
1+175.53  2.62  5.24  3.46  18.13  1,297,117.46 
1+180.00  2.62  5.24  2.24  11.71  1,297,105.76 
1+183.03  2.62  5.24  1.52  7.94  1,297,097.82 
1+186.88  2.62  5.23  1.92  10.07  1,297,087.75 
1+187.01  2.62  5.23  0.06  0.33  1,297,087.42 
1+192.58  2.62  5.23  2.78  14.57  1,297,072.85 
1+195.53  2.62  5.23  1.48  7.72  1,297,065.12 
1+200.00  2.62  5.23  2.24  11.71  1,297,053.42 
1+208.60  2.62  5.23  4.30  22.51  1,297,030.91 
1+215.53  2.62  5.23  3.46  18.13  1,297,012.78 
1+220.00  2.62  5.23  2.24  11.71  1,297,001.08 
1+228.60  2.62  5.23  4.30  22.51  1,296,978.57 
1+235.53  2.62  5.23  3.46  18.13  1,296,960.44 
1+240.00  2.62  5.23  2.24  11.71  1,296,948.74 

718 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

1+248.60  2.62  5.23  4.30  22.51  1,296,926.23 


1+255.53  2.62  5.23  3.46  18.13  1,296,908.10 
1+260.00  2.62  5.23  2.24  11.71  1,296,896.40 
1+268.60  2.62  5.23  4.30  22.51  1,296,873.89 
1+275.53  2.62  5.23  3.46  18.13  1,296,855.76 
1+280.00  2.62  5.23  2.24  11.71  1,296,844.06 
1+288.60  2.62  5.23  4.30  22.51  1,296,821.55 
1+295.53  2.62  5.23  3.46  18.13  1,296,803.42 
1+300.00  2.62  5.23  2.24  11.71  1,296,791.72 
1+308.60  2.62  5.23  4.30  22.51  1,296,769.21 
1+315.53  2.62  5.23  3.46  18.13  1,296,751.08 
1+320.00  2.62  5.23  2.24  11.71  1,296,739.38 
1+328.60  2.62  5.23  4.30  22.51  1,296,716.87 
1+335.53  2.62  5.23  3.46  18.13  1,296,698.74 
1+340.00  2.62  5.23  2.24  11.71  1,296,687.04 
1+348.60  2.62  5.23  4.30  22.51  1,296,664.53 
1+355.53  2.62  5.23  3.46  18.13  1,296,646.40 
1+360.00  2.62  5.23  2.24  11.71  1,296,634.70 
1+368.60  2.62  5.23  4.30  22.50  1,296,612.19 
1+375.53  2.62  5.23  3.46  18.13  1,296,594.06 
1+380.00  2.62  5.23  2.24  11.71  1,296,582.36 
1+388.60  2.62  5.23  4.30  22.51  1,296,559.85 
1+395.53  2.62  5.23  3.46  18.13  1,296,541.72 
1+400.00  2.62  5.23  2.24  11.71  1,296,530.02 
1+408.60  2.62  5.23  4.30  22.51  1,296,507.51 
1+415.53  2.62  5.23  3.46  18.13  1,296,489.38 
1+420.00  2.62  5.23  2.24  11.71  1,296,477.68 
1+428.60  2.62  5.23  4.30  22.51  1,296,455.17 
1+435.53  2.62  5.23  3.46  18.13  1,296,437.04 
1+440.00  2.62  5.23  2.24  11.71  1,296,425.34 
1+448.60  2.62  5.23  4.30  22.51  1,296,402.83 
1+455.53  2.62  5.23  3.46  18.13  1,296,384.70 
1+460.00  2.62  5.23  2.24  11.71  1,296,373.00 
1+468.60  2.62  5.23  4.30  22.50  1,296,350.49 
1+475.53  2.62  5.23  3.46  18.13  1,296,332.36 
1+480.00  2.62  5.23  2.24  11.71  1,296,320.66 
1+488.60  2.62  5.23  4.30  22.51  1,296,298.15 
1+495.53  2.62  5.23  3.46  18.13  1,296,280.02 
1+500.00  2.62  5.23  2.24  11.71  1,296,268.32 
1+508.60  2.62  5.23  4.30  22.51  1,296,245.81 
1+515.53  2.62  5.23  3.46  18.13  1,296,227.68 
1+520.00  2.62  5.23  2.24  11.71  1,296,215.98 
1+528.60  2.62  5.23  4.30  22.50  1,296,193.47 
1+535.53  2.62  5.23  3.46  18.13  1,296,175.34 
1+540.00  2.62  5.23  2.24  11.71  1,296,163.64 

719 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

1+548.60  2.62  5.23  4.30  22.51  1,296,141.13 


1+555.53  2.62  5.23  3.46  18.13  1,296,123.00 
1+560.00  2.62  5.23  2.24  11.71  1,296,111.30 
1+568.60  2.62  5.23  4.30  22.50  1,296,088.79 
1+575.53  2.62  5.23  3.46  18.13  1,296,070.66 
1+580.00  2.62  5.23  2.24  11.71  1,296,058.96 
1+588.60  2.62  5.23  4.30  22.50  1,296,036.45 
1+595.53  2.62  5.23  3.46  18.13  1,296,018.32 
1+600.00  2.62  5.23  2.24  11.71  1,296,006.62 
1+608.60  2.62  5.23  4.30  22.50  1,295,984.11 
1+615.53  2.62  5.23  3.46  18.13  1,295,965.98 
1+620.00  2.62  5.23  2.24  11.71  1,295,954.28 
1+628.60  2.62  5.23  4.30  22.50  1,295,931.77 
1+635.53  2.62  5.23  3.46  18.13  1,295,913.64 
1+640.00  2.62  5.23  2.24  11.71  1,295,901.94 
1+642.06  2.62  5.23  1.03  5.40  1,295,896.54 
1+645.53  2.62  5.23  1.73  9.06  1,295,887.47 
1+652.06  2.62  5.23  3.27  17.11  1,295,870.37 
1+655.53  2.62  5.23  1.73  9.06  1,295,861.30 
1+660.00  2.62  5.23  2.24  11.71  1,295,849.60 
1+660.09  2.62  5.23  0.04  0.22  1,295,849.37 
1+662.07  2.62  5.23  0.99  5.18  1,295,844.19 
1+665.53  2.62  5.23  1.73  9.06  1,295,835.14 
1+672.14  2.61  5.23  3.31  17.28  1,295,817.85 
1+675.53  2.60  5.21  1.69  8.82  1,295,809.03 
1+680.00  2.59  5.20  2.24  11.62  1,295,797.41 
1+682.31  2.59  5.18  1.15  5.97  1,295,791.44 
1+685.53  2.57  5.16  1.61  8.30  1,295,783.13 
1+692.57  2.53  5.10  3.52  17.98  1,295,765.16 
1+695.53  2.51  5.04  1.48  7.45  1,295,757.70 
1+700.00  2.46  4.97  2.23  11.11  1,295,746.59 
1+702.96  2.43  4.89  1.48  7.24  1,295,739.35 
1+705.54  2.39  4.82  1.29  6.21  1,295,733.14 
1+713.51  2.25  4.64  3.98  18.48  1,295,714.66 
1+715.55  2.20  4.44  1.02  4.54  1,295,710.13 
1+720.00  2.08  4.28  2.23  9.52  1,295,700.60 
1+720.00  2.08  4.16  0.00  0.00  1,295,700.60 
1+724.26  1.95  4.03  2.13  8.57  1,295,692.02 
1+725.56  1.91  3.85  0.65  2.50  1,295,689.52 
1+735.18  1.61  3.52  4.81  16.90  1,295,672.62 
1+735.57  1.60  3.21  0.20  0.63  1,295,671.99 
1+739.40  1.48  3.08  1.92  5.90  1,295,666.09 
1+740.00  1.46  2.94  0.30  0.88  1,295,665.21 
1+745.58  1.29  2.75  2.79  7.69  1,295,657.53 
1+754.77  1.02  2.31  4.59  10.61  1,295,646.91 

720 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  a1+a2  Semi‐  Volumen  Ordenada 


Cadenamiento 
Balasto     distancia  Balasto  curva masa 
 
TRAMO DEL KM. 0+000.00 AL 1+815.63   

1+755.60  0.99  2.01  0.41  0.83  1,295,646.09 


1+756.15  0.98  1.97  0.28  0.55  1,295,645.54 
1+758.37  0.91  1.89  1.11  2.10  1,295,643.44 
1+760.00  0.86  1.77  0.82  1.45  1,295,642.00 
1+760.25  0.86  1.72  0.13  0.22  1,295,641.78 
1+764.30  0.74  1.60  2.02  3.23  1,295,638.55 
1+765.61  0.71  1.45  0.65  0.95  1,295,637.60 
1+769.90  0.60  1.30  2.14  2.79  1,295,634.81 
1+775.62  0.47  1.06  2.86  3.04  1,295,631.77 
1+778.52  0.41  0.88  1.45  1.27  1,295,630.50 
1+780.00  0.38  0.79  0.74  0.58  1,295,629.91 
1+785.62  0.28  0.66  2.81  1.85  1,295,628.06 
1+790.58  0.20  0.48  2.48  1.20  1,295,626.87 
1+795.62  0.14  0.34  2.52  0.87  1,295,626.00 
1+800.00  0.09  0.23  2.19  0.51  1,295,625.49 
1+804.15  0.06  0.15  2.08  0.32  1,295,625.17 
1+805.63  0.05  0.11  0.74  0.08  1,295,625.09 
1+815.51  0.01  0.05  4.94  0.27  1,295,624.82 
1+815.63  0.01  0.01  0.06  0.00  1,295,624.82 
 

6.1.5. Cálculo de acarreos para rellenos de zonas encharcables 
A continuación, se presentan los cálculos en las siguientes tablas para el acarreo del material para 
la construcción de la capa de relleno en zonas encharcables 

 
TABLA 54 CÁLCULO DE ACARREOS DE BALASTO VÍA PRINCIPAL DEL TRAMO 6017+000 AL 6030+000 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6017+000.00  0.00  0.00        1,300,000.00 


6017+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+027.24  0.00  0.00  3.62  0.00  1,300,000.00 
6017+040.00  0.00  0.00  6.38  0.00  1,300,000.00 
6017+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+160.00  0.00  0.00  10.00  0.00  1,300,000.00 

721 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6017+180.00  0.00  0.00  10.00  0.00  1,300,000.00 


6017+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+579.55  0.00  0.00  9.78  0.00  1,300,000.00 
6017+580.00  0.00  0.00  0.22  0.00  1,300,000.00 
6017+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+606.68  0.00  0.00  3.34  0.00  1,300,000.00 
6017+606.68  0.00  0.00  0.00  0.00  1,300,000.00 
6017+606.68  0.00  0.00  0.00  0.00  1,300,000.00 
6017+620.00  0.00  0.00  6.66  0.00  1,300,000.00 
6017+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+670.68  0.00  0.00  5.34  0.00  1,300,000.00 
6017+670.68  0.00  0.00  0.00  0.00  1,300,000.00 
6017+670.68  0.00  0.00  0.00  0.00  1,300,000.00 
6017+680.00  0.00  0.00  4.66  0.00  1,300,000.00 
6017+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+729.55  0.00  0.00  4.78  0.00  1,300,000.00 
6017+740.00  0.00  0.00  5.22  0.00  1,300,000.00 
6017+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+780.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+900.00  0.00  0.00  10.00  0.00  1,300,000.00 

722 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6017+902.74  0.00  0.00  1.37  0.00  1,300,000.00 


6017+920.00  0.00  0.00  8.63  0.00  1,300,000.00 
6017+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6017+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+052.74  0.00  0.00  6.37  0.00  1,300,000.00 
6018+060.00  0.00  0.00  3.63  0.00  1,300,000.00 
6018+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+250.00  0.00  0.00  5.00  0.00  1,300,000.00 
6018+250.00  0.00  0.00  0.00  0.00  1,300,000.00 
6018+260.00  0.00  0.00  5.00  0.00  1,300,000.00 
6018+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+580.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+720.00  0.00  0.00  10.00  0.00  1,300,000.00 

723 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6018+727.00  0.00  0.00  3.50  0.00  1,300,000.00 


6018+740.00  0.00  0.00  6.50  0.00  1,300,000.00 
6018+747.00  0.00  0.00  3.50  0.00  1,300,000.00 
6018+757.00  0.00  0.00  5.00  0.00  1,300,000.00 
6018+760.00  0.00  0.00  1.50  0.00  1,300,000.00 
6018+767.00  0.00  0.00  3.50  0.00  1,300,000.00 
6018+777.00  0.00  0.00  5.00  0.00  1,300,000.00 
6018+780.00  0.00  0.00  1.50  0.00  1,300,000.00 
6018+787.00  0.00  0.00  3.50  0.00  1,300,000.00 
6018+797.00  0.00  0.00  5.00  0.00  1,300,000.00 
6018+800.00  0.00  0.00  1.50  0.00  1,300,000.00 
6018+807.00  0.00  0.00  3.50  0.00  1,300,000.00 
6018+817.00  0.00  0.00  5.00  0.00  1,300,000.00 
6018+820.00  0.00  0.00  1.50  0.00  1,300,000.00 
6018+827.00  0.00  0.00  3.50  0.00  1,300,000.00 
6018+837.00  0.00  0.00  5.00  0.00  1,300,000.00 
6018+840.00  0.00  0.00  1.50  0.00  1,300,000.00 
6018+847.00  0.00  0.00  3.50  0.00  1,300,000.00 
6018+857.00  0.00  0.00  5.00  0.00  1,300,000.00 
6018+860.00  0.00  0.00  1.50  0.00  1,300,000.00 
6018+867.00  0.00  0.00  3.50  0.00  1,300,000.00 
6018+880.00  0.00  0.00  6.50  0.00  1,300,000.00 
6018+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6018+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+070.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+070.00  0.00  0.00  0.00  0.00  1,300,000.00 
6019+080.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+160.00  0.00  0.00  0.00  0.00  1,300,000.00 
6019+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+247.00  0.00  0.00  3.50  0.00  1,300,000.00 
6019+257.00  0.00  0.00  5.00  0.00  1,300,000.00 

724 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6019+260.00  0.00  0.00  1.50  0.00  1,300,000.00 


6019+267.00  0.00  0.00  3.50  0.00  1,300,000.00 
6019+277.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+280.00  0.00  0.00  1.50  0.00  1,300,000.00 
6019+287.00  0.00  0.00  3.50  0.00  1,300,000.00 
6019+297.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+300.00  0.00  0.00  1.50  0.00  1,300,000.00 
6019+307.00  0.00  0.00  3.50  0.00  1,300,000.00 
6019+317.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+320.00  0.00  0.00  1.50  0.00  1,300,000.00 
6019+327.00  0.00  0.00  3.50  0.00  1,300,000.00 
6019+337.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+340.00  0.00  0.00  1.50  0.00  1,300,000.00 
6019+347.00  0.00  0.00  3.50  0.00  1,300,000.00 
6019+357.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+360.00  0.00  0.00  1.50  0.00  1,300,000.00 
6019+366.83  0.00  0.00  3.42  0.00  1,300,000.00 
6019+380.00  0.00  0.00  6.58  0.00  1,300,000.00 
6019+386.83  0.00  0.00  3.42  0.00  1,300,000.00 
6019+400.00  0.00  0.00  6.58  0.00  1,300,000.00 
6019+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+570.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+580.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+590.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+600.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+610.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+620.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+630.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+640.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+650.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+660.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+670.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+680.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+690.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+700.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+710.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+720.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+730.00  0.00  0.00  5.00  0.00  1,300,000.00 

725 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6019+740.00  0.00  0.00  5.00  0.00  1,300,000.00 


6019+750.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+760.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+770.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+780.00  0.00  0.00  5.00  0.00  1,300,000.00 
6019+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6019+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+580.00  0.00  0.00  10.00  0.00  1,300,000.00 

726 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6020+600.00  0.00  0.00  10.00  0.00  1,300,000.00 


6020+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+740.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+780.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+880.00  0.00  0.00  0.00  0.00  1,300,000.00 
6020+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6020+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+250.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+260.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+270.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+280.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+290.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+300.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+310.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+320.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+330.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+340.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+350.00  0.00  0.00  5.00  0.00  1,300,000.00 

727 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6021+360.00  0.00  0.00  5.00  0.00  1,300,000.00 


6021+370.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+380.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+390.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+400.00  0.00  0.00  5.00  0.00  1,300,000.00 
6021+409.97  0.00  0.00  4.99  0.00  1,300,000.00 
6021+420.00  0.00  0.00  5.01  0.00  1,300,000.00 
6021+429.97  0.00  0.00  4.99  0.00  1,300,000.00 
6021+440.00  0.00  0.00  5.01  0.00  1,300,000.00 
6021+455.00  0.00  0.00  7.50  0.00  1,300,000.00 
6021+455.00  0.00  0.00  0.00  0.00  1,300,000.00 
6021+460.00  0.00  0.00  2.50  0.00  1,300,000.00 
6021+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+580.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+702.74  0.00  0.00  1.37  0.00  1,300,000.00 
6021+720.00  0.00  0.00  8.63  0.00  1,300,000.00 
6021+740.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+775.00  0.00  0.00  7.50  0.00  1,300,000.00 
6021+775.00  0.00  0.00  0.00  0.00  1,300,000.00 
6021+780.00  0.00  0.00  2.50  0.00  1,300,000.00 
6021+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+852.74  0.00  0.00  6.37  0.00  1,300,000.00 
6021+860.00  0.00  0.00  3.63  0.00  1,300,000.00 
6021+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6021+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+040.00  0.00  0.00  10.00  0.00  1,300,000.00 

728 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6022+060.00  0.00  0.00  10.00  0.00  1,300,000.00 


6022+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+095.00  0.00  0.00  7.50  0.00  1,300,000.00 
6022+095.00  0.00  0.00  0.00  0.00  1,300,000.00 
6022+100.00  0.00  0.00  2.50  0.00  1,300,000.00 
6022+100.00  0.00  0.00  0.00  0.00  1,300,000.00 
6022+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+170.00  0.00  0.00  5.00  0.00  1,300,000.00 
6022+170.00  0.00  0.00  0.00  0.00  1,300,000.00 
6022+180.00  0.00  0.00  5.00  0.00  1,300,000.00 
6022+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6022+420.00  10.85  10.85  10.00  108.45  1,299,891.55 
6022+440.00  14.27  25.12  10.00  251.18  1,299,640.37 
6022+460.00  16.64  30.92  10.00  309.17  1,299,331.20 
6022+480.00  22.40  39.04  10.00  390.39  1,298,940.81 
6022+500.00  13.72  36.12  10.00  361.19  1,298,579.62 
6022+520.00  15.50  29.23  10.00  292.28  1,298,287.34 
6022+540.00  20.02  35.53  10.00  355.27  1,297,932.07 
6022+560.00  18.88  38.90  10.00  389.04  1,297,543.03 
6022+580.00  22.55  41.43  10.00  414.31  1,297,128.72 
6022+600.00  23.78  46.33  10.00  463.27  1,296,665.45 
6022+620.00  23.06  46.84  10.00  468.37  1,296,197.08 
6022+640.00  30.26  53.32  10.00  533.18  1,295,663.90 
6022+660.00  25.70  55.95  10.00  559.54  1,295,104.36 
6022+680.00  15.45  41.15  10.00  411.50  1,294,692.86 
6022+700.00  20.12  35.58  10.00  355.75  1,294,337.11 
6022+720.00  29.80  49.92  10.00  499.19  1,293,837.92 
6022+740.00  19.11  48.91  10.00  489.11  1,293,348.81 
6022+760.00  25.51  44.62  10.00  446.24  1,292,902.57 
6022+780.00  28.94  54.45  10.00  544.49  1,292,358.08 
6022+800.00  26.71  55.65  10.00  556.45  1,291,801.63 
6022+820.00  26.09  52.80  10.00  527.99  1,291,273.64 
6022+840.00  26.39  52.49  10.00  524.86  1,290,748.78 

729 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6022+860.00  25.19  51.58  10.00  515.84  1,290,232.94 


6022+880.00  30.43  55.62  10.00  556.22  1,289,676.72 
6022+900.00  27.33  57.76  10.00  577.63  1,289,099.09 
6022+920.00  35.93  63.26  10.00  632.57  1,288,466.52 
6022+940.00  31.27  67.19  10.00  671.94  1,287,794.58 
6022+960.00  27.65  58.91  10.00  589.13  1,287,205.45 
6022+980.00  21.85  49.49  10.00  494.91  1,286,710.54 
6023+000.00  20.48  42.33  10.00  423.26  1,286,287.28 
6023+020.00  12.48  32.96  10.00  329.59  1,285,957.69 
6023+040.00  19.23  31.71  10.00  317.12  1,285,640.57 
6023+060.00  22.51  41.74  10.00  417.44  1,285,223.13 
6023+080.00  26.24  48.76  10.00  487.55  1,284,735.58 
6023+100.00  28.46  54.71  10.00  547.07  1,284,188.51 
6023+120.00  25.15  53.61  10.00  536.08  1,283,652.43 
6023+140.00  26.61  51.75  10.00  517.53  1,283,134.90 
6023+160.00  24.65  51.26  10.00  512.58  1,282,622.32 
6023+180.00  26.58  51.23  10.00  512.26  1,282,110.06 
6023+200.00  29.18  55.75  10.00  557.51  1,281,552.55 
6023+220.00  21.52  50.69  10.00  506.92  1,281,045.63 
6023+240.00  22.01  43.53  10.00  435.31  1,280,610.32 
6023+260.00  11.89  33.90  10.00  339.03  1,280,271.29 
6023+280.00  20.72  32.61  10.00  326.06  1,279,945.23 
6023+300.00  15.78  36.50  10.00  365.00  1,279,580.23 
6023+320.00  15.66  31.44  10.00  314.41  1,279,265.82 
6023+340.00  9.31  24.97  10.00  249.70  1,279,016.12 
6023+360.00  18.14  27.45  10.00  274.53  1,278,741.59 
6023+380.00  27.67  45.81  10.00  458.11  1,278,283.48 
6023+400.00  30.22  57.89  10.00  578.87  1,277,704.61 
6023+420.00  25.27  55.49  10.00  554.88  1,277,149.73 
6023+440.00  17.28  42.55  10.00  425.52  1,276,724.21 
6023+460.00  19.94  37.22  10.00  372.18  1,276,352.03 
6023+480.00  17.72  37.66  10.00  376.59  1,275,975.44 
6023+500.00  26.36  44.08  10.00  440.84  1,275,534.60 
6023+520.00  31.61  57.97  10.00  579.70  1,274,954.90 
6023+540.00  22.93  54.54  10.00  545.37  1,274,409.53 
6023+560.00  11.55  34.48  10.00  344.83  1,274,064.70 
6023+580.00  16.97  28.52  10.00  285.20  1,273,779.50 
6023+600.00  32.88  49.85  10.00  498.47  1,273,281.03 
6023+620.00  29.05  61.93  10.00  619.28  1,272,661.75 
6023+640.00  36.93  65.97  10.00  659.74  1,272,002.01 
6023+660.00  37.31  74.24  10.00  742.36  1,271,259.65 
6023+680.00  35.76  73.07  10.00  730.65  1,270,529.00 
6023+700.00  33.02  68.77  10.00  687.72  1,269,841.28 
6023+720.00  27.41  60.42  10.00  604.22  1,269,237.06 
6023+740.00  14.34  41.74  10.00  417.43  1,268,819.63 

730 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
Encharcable     distancia Encharcable  curva masa 
 
TRAMO DEL KM. 6017+000 AL 6024+376.40   

6023+760.00  20.12  34.45  10.00  344.53  1,268,475.10 


6023+780.00  33.08  53.20  10.00  531.96  1,267,943.14 
6023+800.00  25.38  58.46  10.00  584.56  1,267,358.58 
6023+820.00  31.70  57.07  10.00  570.73  1,266,787.85 
6023+840.00  27.26  58.96  10.00  589.58  1,266,198.27 
6023+860.00  18.46  45.72  10.00  457.20  1,265,741.07 
6023+880.00  13.31  31.76  10.00  317.64  1,265,423.43 
6023+880.00  13.82  27.13  0.00  0.01  1,265,423.42 
6023+900.00  11.78  25.60  10.00  255.99  1,265,167.43 
6023+920.00  0.00  11.78  10.00  117.80  1,265,049.63 
6023+940.00  0.00  0.00  10.00  0.00  1,265,049.63 
6023+960.00  0.00  0.00  10.00  0.00  1,265,049.63 
6023+980.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+000.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+020.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+040.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+049.07  0.00  0.00  4.54  0.00  1,265,049.63 
6024+060.00  0.00  0.00  5.46  0.00  1,265,049.63 
6024+080.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+100.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+120.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+140.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+160.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+180.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+199.07  0.00  0.00  9.54  0.00  1,265,049.63 
6024+200.00  0.00  0.00  0.46  0.00  1,265,049.63 
6024+220.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+240.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+260.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+270.00  0.00  0.00  5.00  0.00  1,265,049.63 
6024+270.00  0.00  0.00  0.00  0.00  1,265,049.63 
6024+280.00  0.00  0.00  5.00  0.00  1,265,049.63 
6024+300.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+316.48  0.00  0.00  8.24  0.00  1,265,049.63 
6024+320.00  0.00  0.00  1.76  0.00  1,265,049.63 
6024+340.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+360.00  0.00  0.00  10.00  0.00  1,265,049.63 
6024+376.40  0.00  0.00  8.20  0.00  1,265,049.63 

731 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

 
TABLA 55 CÁLCULO DE ACARREOS DE BALASTO VÍA PRINCIPAL DEL TRAMO 6036+800– 6067+000 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6036+800.00  0.00  0.00        1,300,000.00 


6036+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6036+992.12  0.00  0.00  6.06  0.00  1,300,000.00 
6037+000.00  0.00  0.00  3.94  0.00  1,300,000.00 
6037+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+142.12  0.00  0.00  1.06  0.00  1,300,000.00 
6037+160.00  0.00  0.00  8.94  0.00  1,300,000.00 
6037+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+316.55  0.00  0.00  8.28  0.00  1,300,000.00 
6037+320.00  0.00  0.00  1.72  0.00  1,300,000.00 
6037+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+466.55  0.00  0.00  3.28  0.00  1,300,000.00 
6037+480.00  0.00  0.00  6.72  0.00  1,300,000.00 
6037+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+520.00  0.00  0.00  10.00  0.00  1,300,000.00 

732 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6037+540.00  0.00  0.00  10.00  0.00  1,300,000.00 


6037+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+580.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+740.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+780.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6037+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+420.00  0.00  0.00  10.00  0.00  1,300,000.00 

733 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6038+440.00  0.00  0.00  10.00  0.00  1,300,000.00 


6038+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+580.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+740.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+780.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6038+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+320.00  0.00  0.00  10.00  0.00  1,300,000.00 

734 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6039+340.00  0.00  0.00  10.00  0.00  1,300,000.00 


6039+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+580.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+722.65  0.00  0.00  1.33  0.00  1,300,000.00 
6039+730.00  0.00  0.00  3.67  0.00  1,300,000.00 
6039+740.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+742.65  0.00  0.00  1.33  0.00  1,300,000.00 
6039+750.00  0.00  0.00  3.67  0.00  1,300,000.00 
6039+760.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+770.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+780.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+790.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+800.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+810.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+820.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+830.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+840.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+850.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+860.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+870.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+880.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+890.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+900.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+910.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+920.00  0.00  0.00  5.00  0.00  1,300,000.00 
6039+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6039+980.00  0.00  0.00  10.00  0.00  1,300,000.00 

735 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6040+000.00  0.00  0.00  10.00  0.00  1,300,000.00 


6040+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+333.37  0.00  0.00  6.69  0.00  1,300,000.00 
6040+340.00  0.00  0.00  3.31  0.00  1,300,000.00 
6040+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+483.37  0.00  0.00  1.69  0.00  1,300,000.00 
6040+500.00  0.00  0.00  8.31  0.00  1,300,000.00 
6040+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+580.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+740.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+780.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+781.48  0.00  0.00  0.74  0.00  1,300,000.00 
6040+800.00  0.00  0.00  9.26  0.00  1,300,000.00 
6040+820.00  0.00  0.00  10.00  0.00  1,300,000.00 

736 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6040+840.00  0.00  0.00  10.00  0.00  1,300,000.00 


6040+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+931.48  0.00  0.00  5.74  0.00  1,300,000.00 
6040+940.00  0.00  0.00  4.26  0.00  1,300,000.00 
6040+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6040+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+390.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+400.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+410.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+420.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+430.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+440.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+450.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+460.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+470.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+480.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+490.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+500.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+510.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+520.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+530.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+540.00  0.00  0.00  5.00  0.00  1,300,000.00 

737 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6041+550.00  0.00  0.00  5.00  0.00  1,300,000.00 


6041+560.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+564.54  0.00  0.00  2.27  0.00  1,300,000.00 
6041+570.00  0.00  0.00  2.73  0.00  1,300,000.00 
6041+580.00  0.00  0.00  5.00  0.00  1,300,000.00 
6041+584.54  0.00  0.00  2.27  0.00  1,300,000.00 
6041+600.00  0.00  0.00  7.73  0.00  1,300,000.00 
6041+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+740.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+780.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6041+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+360.00  0.00  0.00  10.00  0.00  1,300,000.00 

738 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6042+380.00  0.00  0.00  10.00  0.00  1,300,000.00 


6042+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+580.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+740.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+780.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6042+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+160.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+180.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+200.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+260.00  0.00  0.00  10.00  0.00  1,300,000.00 

739 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6043+280.00  0.00  0.00  10.00  0.00  1,300,000.00 


6043+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+380.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+400.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+420.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+440.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+460.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+480.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+500.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+520.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+540.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+560.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+580.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+600.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+620.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+640.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+660.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+680.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+700.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+720.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+740.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+760.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+780.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+800.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+820.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+840.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+860.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+880.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+900.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+920.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+940.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+960.00  0.00  0.00  10.00  0.00  1,300,000.00 
6043+980.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+000.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+020.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+040.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+060.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+080.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+100.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+120.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+140.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+160.00  0.00  0.00  10.00  0.00  1,300,000.00 

740 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6044+180.00  0.00  0.00  10.00  0.00  1,300,000.00 


6044+185.00  0.00  0.00  2.50  0.00  1,300,000.00 
6044+185.00  0.00  0.00  0.00  0.00  1,300,000.00 
6044+200.00  0.00  0.00  7.50  0.00  1,300,000.00 
6044+220.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+240.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+260.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+280.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+300.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+320.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+320.00  0.00  0.00  0.00  0.00  1,300,000.00 
6044+340.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+360.00  0.00  0.00  10.00  0.00  1,300,000.00 
6044+370.00  0.00  0.00  5.00  0.00  1,300,000.00 
6044+380.00  13.30  13.30  5.00  66.52  1,299,933.49 
6044+400.00  3.61  16.91  10.00  169.10  1,299,764.39 
6044+420.00  3.92  7.52  10.00  75.22  1,299,689.17 
6044+440.00  17.77  21.69  10.00  216.89  1,299,472.28 
6044+460.00  22.23  40.01  10.00  400.06  1,299,072.22 
6044+480.00  15.91  38.15  10.00  381.46  1,298,690.76 
6044+500.00  22.71  38.63  10.00  386.27  1,298,304.49 
6044+520.00  35.82  58.53  10.00  585.31  1,297,719.18 
6044+540.00  35.98  71.80  10.00  717.99  1,297,001.19 
6044+560.00  28.98  64.96  10.00  649.63  1,296,351.56 
6044+580.00  25.87  54.85  10.00  548.53  1,295,803.03 
6044+600.00  25.41  51.29  10.00  512.85  1,295,290.18 
6044+620.00  29.30  54.72  10.00  547.15  1,294,743.03 
6044+640.00  35.12  64.42  10.00  644.19  1,294,098.84 
6044+660.00  28.90  64.02  10.00  640.21  1,293,458.63 
6044+680.00  32.84  61.74  10.00  617.41  1,292,841.22 
6044+700.00  34.47  67.31  10.00  673.10  1,292,168.12 
6044+720.00  25.52  59.99  10.00  599.87  1,291,568.25 
6044+740.00  23.86  49.38  10.00  493.77  1,291,074.48 
6044+760.00  21.91  45.77  10.00  457.67  1,290,616.81 
6044+780.00  23.63  45.53  10.00  455.32  1,290,161.49 
6044+800.00  16.81  40.44  10.00  404.40  1,289,757.09 
6044+820.00  23.14  39.95  10.00  399.53  1,289,357.56 
6044+840.00  15.11  38.25  10.00  382.45  1,288,975.11 
6044+860.00  9.14  24.24  10.00  242.41  1,288,732.70 
6044+880.00  25.59  34.72  10.00  347.23  1,288,385.47 
6044+900.00  29.66  55.25  10.00  552.47  1,287,833.00 
6044+920.00  28.37  58.03  10.00  580.31  1,287,252.69 
6044+940.00  27.32  55.69  10.00  556.90  1,286,695.79 
6044+960.00  25.42  52.74  10.00  527.41  1,286,168.38 
6044+980.00  28.59  54.01  10.00  540.09  1,285,628.29 

741 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6045+000.00  31.71  60.30  10.00  602.98  1,285,025.31 


6045+020.00  37.90  69.61  10.00  696.13  1,284,329.18 
6045+040.00  36.67  74.57  10.00  745.73  1,283,583.45 
6045+060.00  44.55  81.22  10.00  812.24  1,282,771.21 
6045+080.00  43.87  88.42  10.00  884.22  1,281,886.99 
6045+100.00  34.23  78.10  10.00  781.00  1,281,105.99 
6045+120.00  34.01  68.24  10.00  682.44  1,280,423.55 
6045+140.00  22.18  56.20  10.00  561.97  1,279,861.58 
6045+160.00  34.32  56.50  10.00  565.00  1,279,296.58 
6045+180.00  37.51  71.83  10.00  718.28  1,278,578.30 
6045+200.00  40.29  77.80  10.00  778.01  1,277,800.29 
6045+220.00  38.82  79.10  10.00  791.04  1,277,009.25 
6045+240.00  41.26  80.07  10.00  800.73  1,276,208.52 
6045+260.00  39.75  81.01  10.00  810.07  1,275,398.45 
6045+280.00  39.53  79.28  10.00  792.81  1,274,605.64 
6045+300.00  33.28  72.81  10.00  728.07  1,273,877.57 
6045+320.00  40.69  73.97  10.00  739.65  1,273,137.92 
6045+340.00  44.68  85.37  10.00  853.74  1,272,284.18 
6045+360.00  34.53  79.21  10.00  792.14  1,271,492.04 
6045+380.00  40.76  75.29  10.00  752.89  1,270,739.15 
6045+400.00  41.00  81.76  10.00  817.59  1,269,921.56 
6045+420.00  34.77  75.77  10.00  757.68  1,269,163.88 
6045+440.00  33.57  68.33  10.00  683.34  1,268,480.54 
6045+460.00  34.63  68.20  10.00  681.95  1,267,798.59 
6045+480.00  30.31  64.94  10.00  649.35  1,267,149.24 
6045+500.00  27.23  57.54  10.00  575.39  1,266,573.85 
6045+520.00  33.09  60.33  10.00  603.25  1,265,970.60 
6045+540.00  34.92  68.02  10.00  680.15  1,265,290.45 
6045+560.00  37.28  72.20  10.00  722.01  1,264,568.44 
6045+580.00  41.97  79.25  10.00  792.48  1,263,775.96 
6045+600.00  53.48  95.45  10.00  954.46  1,262,821.50 
6045+620.00  67.96  121.44  10.00  1214.37  1,261,607.13 
6045+640.00  42.26  110.22  10.00  1102.24  1,260,504.89 
6045+660.00  33.95  76.22  10.00  762.15  1,259,742.74 
6045+680.00  39.95  73.90  10.00  738.97  1,259,003.77 
6045+700.00  35.31  75.26  10.00  752.57  1,258,251.20 
6045+720.00  36.43  71.74  10.00  717.41  1,257,533.79 
6045+740.00  40.33  76.76  10.00  767.62  1,256,766.17 
6045+760.00  42.33  82.66  10.00  826.58  1,255,939.59 
6045+780.00  45.59  87.92  10.00  879.16  1,255,060.43 
6045+800.00  41.39  86.98  10.00  869.78  1,254,190.65 
6045+820.00  46.02  87.40  10.00  874.02  1,253,316.63 
6045+840.00  42.25  88.27  10.00  882.68  1,252,433.95 
6045+860.00  40.87  83.12  10.00  831.18  1,251,602.77 
6045+880.00  37.86  78.73  10.00  787.26  1,250,815.51 

742 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6045+900.00  26.28  64.14  10.00  641.36  1,250,174.15 


6045+920.00  19.81  46.08  10.00  460.82  1,249,713.33 
6045+940.00  35.05  54.86  10.00  548.61  1,249,164.72 
6045+960.00  38.07  73.12  10.00  731.22  1,248,433.50 
6045+980.00  37.16  75.22  10.00  752.23  1,247,681.27 
6046+000.00  40.88  78.03  10.00  780.33  1,246,900.94 
6046+020.00  41.02  81.90  10.00  819.02  1,246,081.92 
6046+040.00  37.03  78.05  10.00  780.50  1,245,301.42 
6046+060.00  44.44  81.46  10.00  814.61  1,244,486.81 
6046+080.00  43.97  88.40  10.00  884.04  1,243,602.77 
6046+100.00  47.96  91.93  10.00  919.28  1,242,683.49 
6046+120.00  49.53  97.49  10.00  974.86  1,241,708.63 
6046+140.00  50.21  99.74  10.00  997.37  1,240,711.26 
6046+160.00  42.31  92.52  10.00  925.24  1,239,786.02 
6046+180.00  36.35  78.67  10.00  786.67  1,238,999.35 
6046+200.00  46.84  83.20  10.00  831.96  1,238,167.39 
6046+220.00  49.95  96.79  10.00  967.89  1,237,199.50 
6046+240.00  56.39  106.34  10.00  1063.36  1,236,136.14 
6046+260.00  49.72  106.11  10.00  1061.07  1,235,075.07 
6046+280.00  40.42  90.13  10.00  901.33  1,234,173.74 
6046+300.00  44.28  84.69  10.00  846.92  1,233,326.82 
6046+320.00  45.77  90.05  10.00  900.47  1,232,426.35 
6046+340.00  47.19  92.96  10.00  929.61  1,231,496.74 
6046+360.00  43.51  90.70  10.00  907.01  1,230,589.73 
6046+380.00  47.00  90.51  10.00  905.13  1,229,684.60 
6046+400.00  44.92  91.92  10.00  919.21  1,228,765.39 
6046+420.00  38.37  83.29  10.00  832.89  1,227,932.50 
6046+440.00  42.58  80.95  10.00  809.49  1,227,123.01 
6046+460.00  47.28  89.86  10.00  898.60  1,226,224.41 
6046+480.00  39.00  86.28  10.00  862.80  1,225,361.61 
6046+500.00  28.72  67.72  10.00  677.22  1,224,684.39 
6046+520.00  33.63  62.36  10.00  623.57  1,224,060.82 
6046+540.00  34.00  67.63  10.00  676.31  1,223,384.51 
6046+560.00  35.05  69.04  10.00  690.44  1,222,694.07 
6046+580.00  38.03  73.08  10.00  730.81  1,221,963.26 
6046+600.00  45.36  83.40  10.00  833.98  1,221,129.28 
6046+620.00  43.15  88.52  10.00  885.18  1,220,244.10 
6046+640.00  28.19  71.35  10.00  713.48  1,219,530.62 
6046+660.00  31.37  59.56  10.00  595.62  1,218,935.00 
6046+680.00  18.09  49.45  10.00  494.53  1,218,440.47 
6046+700.00  37.26  55.35  10.00  553.47  1,217,887.00 
6046+720.00  34.04  71.30  10.00  713.03  1,217,173.97 
6046+740.00  35.91  69.95  10.00  699.46  1,216,474.51 
6046+760.00  40.50  76.41  10.00  764.09  1,215,710.42 
6046+780.00  38.37  78.87  10.00  788.69  1,214,921.73 

743 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6046+800.00  38.38  76.75  10.00  767.47  1,214,154.26 


6046+820.00  43.59  81.97  10.00  819.67  1,213,334.59 
6046+840.00  0.00  43.59  10.00  435.85  1,212,898.74 
6046+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6046+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6046+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6046+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6046+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6046+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6046+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+000.00  0.00  0.00  0.00  0.00  1,212,898.74 
6047+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+060.00  0.00  0.00  0.00  0.00  1,212,898.74 
6047+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+510.00  0.00  0.00  5.00  0.00  1,212,898.74 
6047+510.00  0.00  0.00  0.00  0.00  1,212,898.74 
6047+520.00  0.00  0.00  5.00  0.00  1,212,898.74 
6047+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+580.00  0.00  0.00  0.00  0.00  1,212,898.74 

744 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6047+600.00  0.00  0.00  10.00  0.00  1,212,898.74 


6047+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6047+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+480.00  0.00  0.00  10.00  0.00  1,212,898.74 

745 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6048+500.00  0.00  0.00  10.00  0.00  1,212,898.74 


6048+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6048+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+380.00  0.00  0.00  10.00  0.00  1,212,898.74 

746 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6049+400.00  0.00  0.00  10.00  0.00  1,212,898.74 


6049+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6049+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+280.00  0.00  0.00  10.00  0.00  1,212,898.74 

747 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6050+300.00  0.00  0.00  10.00  0.00  1,212,898.74 


6050+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6050+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+180.00  0.00  0.00  10.00  0.00  1,212,898.74 

748 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6051+200.00  0.00  0.00  10.00  0.00  1,212,898.74 


6051+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6051+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+080.00  0.00  0.00  10.00  0.00  1,212,898.74 

749 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6052+100.00  0.00  0.00  10.00  0.00  1,212,898.74 


6052+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+420.00  0.00  0.00  0.00  0.00  1,212,898.74 
6052+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+490.00  0.00  0.00  5.00  0.00  1,212,898.74 
6052+490.00  0.00  0.00  0.00  0.00  1,212,898.74 
6052+500.00  0.00  0.00  5.00  0.00  1,212,898.74 
6052+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+920.00  0.00  0.00  10.00  0.00  1,212,898.74 

750 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6052+940.00  0.00  0.00  10.00  0.00  1,212,898.74 


6052+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6052+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+820.00  0.00  0.00  10.00  0.00  1,212,898.74 

751 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6053+840.00  0.00  0.00  10.00  0.00  1,212,898.74 


6053+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6053+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+720.00  0.00  0.00  10.00  0.00  1,212,898.74 

752 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6054+740.00  0.00  0.00  10.00  0.00  1,212,898.74 


6054+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6054+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+620.00  0.00  0.00  10.00  0.00  1,212,898.74 

753 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6055+640.00  0.00  0.00  10.00  0.00  1,212,898.74 


6055+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6055+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+170.00  0.00  0.00  5.00  0.00  1,212,898.74 
6056+170.00  0.00  0.00  0.00  0.00  1,212,898.74 
6056+180.00  0.00  0.00  5.00  0.00  1,212,898.74 
6056+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+300.00  0.00  0.00  0.00  0.00  1,212,898.74 
6056+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+460.00  0.00  0.00  10.00  0.00  1,212,898.74 

754 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6056+480.00  0.00  0.00  10.00  0.00  1,212,898.74 


6056+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+614.06  0.00  0.00  7.03  0.00  1,212,898.74 
6056+620.00  0.00  0.00  2.97  0.00  1,212,898.74 
6056+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+644.06  0.00  0.00  2.03  0.00  1,212,898.74 
6056+660.00  0.00  0.00  7.97  0.00  1,212,898.74 
6056+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+734.82  0.00  0.00  7.41  0.00  1,212,898.74 
6056+740.00  0.00  0.00  2.59  0.00  1,212,898.74 
6056+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+764.82  0.00  0.00  2.41  0.00  1,212,898.74 
6056+770.00  0.00  0.00  2.59  0.00  1,212,898.74 
6056+770.00  0.00  0.00  0.00  0.00  1,212,898.74 
6056+780.00  0.00  0.00  5.00  0.00  1,212,898.74 
6056+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+860.00  0.00  0.00  0.00  0.00  1,212,898.74 
6056+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6056+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+220.00  0.00  0.00  10.00  0.00  1,212,898.74 

755 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6057+240.00  0.00  0.00  10.00  0.00  1,212,898.74 


6057+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+270.00  0.00  0.00  5.00  0.00  1,212,898.74 
6057+270.00  0.00  0.00  0.00  0.00  1,212,898.74 
6057+280.00  0.00  0.00  5.00  0.00  1,212,898.74 
6057+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+340.00  0.00  0.00  0.00  0.00  1,212,898.74 
6057+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6057+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+060.00  0.00  0.00  10.00  0.00  1,212,898.74 

756 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6058+080.00  0.00  0.00  10.00  0.00  1,212,898.74 


6058+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6058+960.00  0.00  0.00  10.00  0.00  1,212,898.74 

757 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6058+980.00  0.00  0.00  10.00  0.00  1,212,898.74 


6059+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+860.00  0.00  0.00  10.00  0.00  1,212,898.74 

758 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6059+880.00  0.00  0.00  10.00  0.00  1,212,898.74 


6059+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6059+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+760.00  0.00  0.00  10.00  0.00  1,212,898.74 

759 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6060+780.00  0.00  0.00  10.00  0.00  1,212,898.74 


6060+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6060+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+660.00  0.00  0.00  10.00  0.00  1,212,898.74 

760 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6061+680.00  0.00  0.00  10.00  0.00  1,212,898.74 


6061+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6061+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+560.00  0.00  0.00  10.00  0.00  1,212,898.74 

761 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6062+580.00  0.00  0.00  10.00  0.00  1,212,898.74 


6062+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6062+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+460.00  0.00  0.00  10.00  0.00  1,212,898.74 

762 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6063+480.00  0.00  0.00  10.00  0.00  1,212,898.74 


6063+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6063+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+360.00  0.00  0.00  10.00  0.00  1,212,898.74 

763 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6064+380.00  0.00  0.00  10.00  0.00  1,212,898.74 


6064+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6064+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+100.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+120.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+260.00  0.00  0.00  10.00  0.00  1,212,898.74 

764 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6065+280.00  0.00  0.00  10.00  0.00  1,212,898.74 


6065+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+560.00  0.00  0.00  0.00  0.00  1,212,898.74 
6065+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+710.00  0.00  0.00  5.00  0.00  1,212,898.74 
6065+710.00  0.00  0.00  0.00  0.00  1,212,898.74 
6065+720.00  0.00  0.00  5.00  0.00  1,212,898.74 
6065+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6065+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+000.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+020.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+040.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+060.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+080.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+100.00  0.00  0.00  10.00  0.00  1,212,898.74 

765 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

Áreas  Semi‐  Volumen  Ordenada 


Cadenamiento  Relleno en zona  a1+a2  Relleno en zona 
distancia curva masa 
Encharcable     Encharcable 
 
TRAMO DEL KM. 6036+800 AL 6067+000   

6066+120.00  0.00  0.00  10.00  0.00  1,212,898.74 


6066+140.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+160.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+180.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+200.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+220.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+240.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+260.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+280.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+300.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+320.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+340.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+360.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+380.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+400.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+420.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+440.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+460.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+480.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+500.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+520.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+540.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+560.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+580.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+600.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+620.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+640.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+660.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+680.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+700.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+720.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+740.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+760.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+780.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+800.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+820.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+840.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+860.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+880.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+900.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+920.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+940.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+960.00  0.00  0.00  10.00  0.00  1,212,898.74 
6066+980.00  0.00  0.00  10.00  0.00  1,212,898.74 
6067+000.00  0.00  0.00  10.00  0.00  1,212,898.74 

766 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

7. PROCEDIMIENTO CONSTRUCTIVO 

7.1. SECUENCIA CONSTRUCTIVA 
7.1.1. Desmonte 

7.1.1.1. Trabajos previos  
Visita de inspección  
Previamente  al  inicio  de  los  trabajos,  se  realizará  una  visita  de  inspección  para  programarlos  y 
determinar el tipo de equipo que se requiere de acuerdo con las características de la vegetación.  
 
Delimitación de las zonas de desmonte  
En  el  caso  de  carreteras,  el  desmonte  se  hará  en  el  derecho  de  vía  según  lo  establecido  en  el 
Proyecto.  

En canales, contracunetas, el desmonte se hará en la superficie limitada por las líneas trazadas a lo 
largo de los ceros de éstas.  

En el caso de zonas de bancos u otras fuera del derecho de vía, el desmonte se hará por lo menos 
hasta un (1) metro fuera del límite de dichas zonas.  

Trasplante de tierras vegetales  
Previamente  o  durante  el  desmonte,  si  así  lo  indica  el  Proyecto,  se  realizará  el  trasplante  de  los 
individuos vegetales, según lo indicado en la norma N‐CTR‐CAR‐1‐09‐003, “Trasplante de Especies 
Vegetales”, trasladándolos a los sitios que señale el proyecto.  

7.1.1.2. Trabajo a realizar 
Los  trabajos  se  realizarán  asegurando  de  que  todo  el  material  vegetal  quede  fuera  de  las  zonas 
destinadas a la construcción, evitando dañar árboles fuera del área indicada en el proyecto.  

Salvo la indicación del Proyecto el desenraice se ejecutará, por lo menos, dentro de las superficies 
limitadas por líneas trazadas a lo largo de los ceros de cortes, terraplenes con espesor menor de un 
(1) metro, canales, contracunetas y zonas de bancos, entre otras.  

El proyecto indicará los árboles o arbustos que deben respetarse, tomándose las medidas necesarias 
para no dañarlos y únicamente se cortarán las ramas que queden a menos de ocho (8) metros sobre 
la  corona  de  la  carretera,  procurando  conservar  la  simetría  y  buena  apariencia  del  árbol.  En 
cualquier caso, se respetarán los árboles y la vegetación adyacente a cuerpos de agua. 

767 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

7.1.2. Despalme 

7.1.2.1. Trabajos previos  
Visita de inspección  
Previamente  al  inicio  de  los  trabajos,  se  realizará  una  visita  de  inspección  para  programarlos  y 
determinar  el  tipo  de  equipo  que  se  requiere  de  acuerdo  con  las  características  del  material  de 
despalme.  

Delimitación de las zonas de despalme  
Previo al inicio del despalme y una vez ejecutado el desmonte como se indica en la norma N‐CTR‐
CAR‐1‐01‐001,  Desmonte,  se  delimitará  la  zona  de  despalme  de  acuerdo  con  lo  indicado  en  el 
proyecto.  

Trasplante de tierras vegetales  
Previamente  o  durante  el  desmonte,  si  así  lo  indica  el  Proyecto,  se  realizará  el  trasplante  de  los 
individuos vegetales, según lo indicado en la norma N‐CTR‐CAR‐1‐09‐003, “Trasplante de Especies 
Vegetales”, trasladándolos a los sitios que señale el proyecto.  

7.1.2.2. Trabajo a realizar 
El espesor del despalme será el que indique el proyecto a la vista de los materiales existentes en el 
lugar, de acuerdo con la estratigrafía del terreno o con la existencia de rellenos artificiales.  

Salvo  indicación  del  proyecto,  el  material  natural  producto  del  despalme  se  empleará  para  el 
recubrimiento  de  los  taludes  de  terraplenes,  así  como  de  los  pisos,  fondo  de  las  excavaciones  y 
taludes de los bancos al término de su explotación, o se distribuirá uniformemente en áreas donde 
no impida el drenaje o que no invada cuerpos de agua, para favorecer el desarrollo de vegetación, 
según lo indique el proyecto.  

Salvo  indicación  del  proyecto,  al  material  producto  del  despalme  colocado  en  taludes  de 
terraplenes, así como en los pisos, fondo de las excavaciones y taludes d ellos bancos o en las zonas 
en donde se distribuyó uniformemente, se le adicionarán semillas de pasto o de vegetación propia 
de la zona, adecuada al paisaje y que no impidan la buena visibilidad, según lo indique el proyecto 
y de acuerdo con la norma N‐CTR‐CAR‐1‐09‐002, “Plantación y Siembra de Especies Vegetales”.  

El retiro de rellenos artificiales se ejecutará cumpliendo con las leyes y reglamentos de protección 
ecológica vigentes. 

768 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

7.1.3. Corte 

7.1.3.1. Trabajos previos  
Desmonte  
Previo al inicio de los trabajos, la zona por cortar estará debidamente desmontada, considerando lo 
señalado en la Norma N‐CTR‐CAR‐1‐01‐001, “Desmonte”. 

Delimitación de la zona de corte  
Una vez terminado el desmonte se delimitará la zona de corte mediante estacas en las líneas de 
ceros, de acuerdo a lo indicado en el proyecto.  

Despalme  
Si el producto del corte se destina a la formación de terraplenes, previo al inicio de los trabajos, la 
zona delimitada para corte estará debidamente despalmada, considerando lo expuesto en la Norma 
N‐CTR‐CAR‐1‐01‐002, “Despalme”.  

7.1.3.2. Trabajos a realizar 
Los cortes se ejecutarán de acuerdo con las líneas de proyecto y sin alterar las áreas fuera de los 
límites de la construcción, indicados por las líneas de ceros en el proyecto.  

Los cortes se ejecutarán de manera que se permita el drenaje natural.  

Los cortes se ejecutarán con el talud establecido en el proyecto. En caso de que los materiales de 
los  taludes  resulten  fragmentados  o  la  superficie  irregular  o  inestable,  el  material  en  estas 
condiciones será removido.  

Cuando se requiera el uso de explosivos, se evitará aflojar el material de los taludes más allá de la 
superficie teórica establecida en el proyecto.  

Si así lo indica el proyecto, los materiales producto del corte se emplearán para construir terraplenes 
o arroparlos reduciendo la inclinación de sus taludes. Los materiales provenientes de derrumbes o 
deslizamientos recientes se retirarán del sitio de los trabajos para aprovecharse en el abatimiento 
de taludes o se depositarán, al igual que el material sobrante de los cortes, en el sitio y forma que 
indique el proyecto, para evitar alteraciones del paisaje, a cuerpos de agua y favorecer el desarrollo 
de vegetación, así como para no obstaculizar el drenaje natural.  

Las  cunetas  se  construirán  de  forma  que  su  desagüe  no  cause  perjuicio  a  los  cortes  ni  a  los 
terraplenes, considerando lo señalado en la Norma N‐CTYR‐CAR‐1‐03‐003, “Cunetas”.  

Salvo indicación del proyecto, las contracunetas se harán antes o simultáneamente con los cortes, 
considerando lo señalado en la Norma N‐CTR‐CAR‐1‐03‐004, “Contracunetas”. 

769 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

7.1.4. Terraplenes 

7.1.4.1. Trabajos previos 
Delimitación de terraplén 
Se delimitará la zona de desplante del terraplén mediante estacas u otras referencias, de acuerdo a 
lo indicado en el proyecto. 

Desmonte y despalme 

Previo al inicio d ellos trabajos, la zona de desplante del terraplén estará debidamente desmontada, 
considerando lo señalado en la Norma N‐CTR‐CAR‐1‐01‐001, “Desmonte”.  Cuando así lo establezca 
el  proyecto,  se  despalmará  de  acuerdo  con  lo  señalado  en  la  Norma  N‐CTR‐CAR‐1‐01‐002, 
“Despalme”. 

Salvo indicación del proyecto, cuando se encuentre material de calidad inaceptable en el área de 
desplante del terraplén, el material será sustituido por otro de mejor calidad, para lo cual se abrirá 
una caja de la profundidad necesaria como parte del despalme.  El proyecto indicará si es necesaria 
la  compactación  del  fondo  de  la  caja,  de  acuerdo  con  las  características  del  material.  La  caja  se 
rellenará con capas compactadas con el material y la compactación que indique el proyecto. 

Escalones de liga 

Salvo indicación del proyecto, en la ampliación de la corona o tendido de taludes en los que no se 
vaya a modificar el ancho de la corona de terraplenes existentes o en trabajos para la elevación de 
la subrasante, se excavarán escalones de liga conforme a lo establecido en el proyecto considerando 
lo señalado en la Norma N‐CTR‐CAR‐1‐01‐004, Escalones de Liga. 

Preparación de la superficie 

Salvo indicación del proyecto, antes de iniciar la construcción de los terraplenes, se rellenarán los 
huecos resultantes de los trabajos de desmonte y despalme con material compactado, asimismo se 
compactará el terreno natural o el despalmado, en el área de desplante, en un espesor mínimo de 
veinte (20) centímetros y a una compactación similar a la del terreno natural. 

En aquellas zonas en las que el trazo a ejecutar discurra por el trazo actual del FIT, una vez se haya 
despalmado y previamente a iniciar el relleno, se procederá a extender el subbalasto y balasto de la 
vía existente en la base del terraplén. 

7.1.4.2. Tendido y Conformación 
Aspectos generales 

770 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

El material proveniente de cortes o bancos se descargará sobre la superficie donde se extenderá, en 
cantidad prefijada por estación de veinte (20) metros, en tramos que no sean mayores a los que, en 
un turno de trabajo, se pueda tender, conformar y compactar o acomodar el material. 

En caso de material   compactable, éste   se preparará hasta   alcanzar el contenido   de agua de 
compactación que indique el proyecto y obtener la homogeneidad en granulometría y humedad, 
extendiéndolo parcialmente e incorporándole el agua necesaria para la compactación, por medio 
de riegos y mezclados sucesivos, o eliminando el agua excedente. 

Siempre que la topografía   del terreno lo permita   el material se extenderá en capas sucesivas 
sensiblemente horizontales en todo el ancho de la sección. 

Si así lo indica el proyecto, cuando la topografía del terreno presente lugares inaccesibles donde no 
sea posible la construcción por capas compactadas o acomodadas utilizando equipo mayor, dichos 
lugares  se  rellenarán  a  volteo  para  formar  una  plantilla  en  la  que  se  pueda  operar  el  equipo, 
prosiguiendo la construcción por capas compactadas de ese nivel en adelante.  El nivel de la plantilla 
será el que indique el proyecto. 

Cuando el nivel de desplante coincida sensiblemente con el nivel freático, se evitará desplantar el 
terraplén directamente sobre la superficie saturada, procediendo al abatimiento del nivel freático 
o  a  colocar  una  primera  capa  a  volteo  de  espesor  suficiente  para  que  soporte  al  equipo,  según 
indique el proyecto. 

Cuando el proyecto lo indique se asegurará la compactación de los hombros de los terraplenes, para 
lo  que  se  construirán  con  una  sección  más  ancha  que  la  teórica  de  proyecto,  respetando  la 
inclinación de los taludes señalada en el proyecto, como se muestra en la Figura 9,obteniéndose así 
los  sobre  anchos  laterales,  con  las  dimensiones  indicadas  en  el  proyecto,  en  los  cuales  la 
compactación podrá ser menor que la fijada. 

771 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

FIGURA 9 SECCIÓN TRANSVERSAL DE UN TERRAPLÉN. 

Salvo indicación del proyecto, como parte final del terraplén se construirán la capa subyacente y, 
por  último,  la  capa  subrogante,  como  se  muestra  en  la  figura  1,  con  los  espesores,  materiales  y 
grados de compactación que establezca el proyecto. 

Cuando el proyecto indique que la construcción de la capa subrasante se ejecute directamente bajo 
el nivel del piso de un corte y los materiales en ese sitio satisfacen las características establecidas 
en el apartado 5 de la presente Instrucción de Trabajo, dicha capa se formará sin necesidad   de una 
excavación  adicional,  escarificando  y  compactando  la  cama  del  corte,  con  el  espesor  y  grado  de 
compactación que establezca el proyecto. 

Tendido y conformación de material compactable 

Para el cuerpo del terraplén, la capa subyacente y a la capa subrasante, el material compactable se 
extenderá en todo el ancho del terraplén, en capas sucesivas, con un espesor no mayor que aquel 
que  el  equipo  sea  capaz  de  compactar  al  grado  indicado  en  el  proyecto,  como  se  indica  en  el 
apartado 9.4 

Compactación de la presente Instrucción de Trabajo, y se conformará de tal manera que se obtenga 
una capa de material sin compactar de espesor uniforme. 

Para la ampliación de las coronas o el tendido de los taludes de terraplenes existentes y previamente 
excavados los escalones de liga en los taludes, de acuerdo con lo indicado en la Norma N‐CTR‐CAR‐

772 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

1‐01‐004, Escalones de Liga, el material compactable se extenderá en todo el ancho de la ampliación 
y se conformará como se indica en el párrafo anterior. 

7.1.4.3. Compactación o acomodo 
Compactación 

Cada capa de material compactable, tendida y conformada como se indica en el inciso 9.3.2 de esta 
Instrucción de Trabajo, se compactará hasta alcanzar el grado indicado en el proyecto. 

La  compactación  se  hará  longitudinalmente,  de  las  orillas  hacia  el  centro  de  las  tangentes  y  del 
interior  al  exterior  en  las  curvas,  con  un  traslape  de  cuando  menos  la  mitad  del  ancho  del 
compactador en cada pasada. 

Acomodo de material no compactable 

Cada capa de material no compactable, tendida y conformada como se indica en el inciso 9.3.3 de 
la presente Instrucción de Trabajo, se acomodará mediante bandeo, ronceando un tractor montado 
sobre  orugas,  que  tenga  una  masa  mínima  de  treinta  y  seis  (36)  toneladas,  de  forma  que  pase 
cuando menos tres (3) veces por cada sitio. El número de pasadas podrá ser ajustado en la obra, 
dependiendo del equipo que se utilice 

El bandeo se hará longitudinalmente, de las orillas hacia el centro en las tangentes y del interior al 
exterior en las curvas, con un traslape de cuando menos la mitad del tractor en cada franja bandeada 

7.2. MAQUINARIA  
La maquinaría a utilizar de manera enunciativa más nunca limitativa se enlista en la Tabla 56. 

Cabe  mencionar  que  la  cantidad  de  maquinaría  será  la  acorde  al  procedimiento  constructivo 
mencionado en el apartado SECUENCIA CONSTRUCTIVA y será siempre la suficiente para abastecer 
todos los frentes de obra propuestos. 

773 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

TABLA 56 MAQUINARÍA PARA CONSTRUCCIÓN DE TERRACERÍAS 

Maquinaria  Uso 
Retroexcavadora  Excavaciones de poca profundidad y carga de material extraído. 

Excavadora  Excavación de mayor profundidad, corte en taludes y carga de material a camión. 

Camiones  para  Vehículos  para  el  acarreo  del  material  producto  de  excavación  y  el  material  de 
acarreo  aportación. 

Cargador Frontal  Carga de material en distancias cortas. 

Motoniveladora  Conformación de capas de terraplén, subrasante, transición, sub‐balasto y balasto. 

Motoescrepa  Cargar, transportar y verter el material suelto. 

Balastera  Serie  de  vagones  usados  para  transportar  y  distribuir  balasto  después  de  haber 
colocado durmientes y rieles 

Bateadora  Nivelación y alineación de la vía, dotada de bates vibrantes que se introducen en la 
capa de balasto y lo vibran enérgicamente bajo los durmientes para dotar a la vía 
de una posición exacta en planta y alzado 

Compactador  de  Compactación de capas terraplén, subrasante, transición y subbalasto 


rodillo 

Compactador  de  Compactación de capas terraplén, subrasante, transición y subbalasto 


pata de cabra 

   

774 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

8. VOLÚMENES GENERADOS 

A  continuación,  se  presentan  los  volúmenes  generados  por  subtramos  y  para  los  materiales  en 
estudio. 

TABLA 57 RESUMEN DE VOLÚMENES GENERADOS DEL TRAMO 3 
Corte  Relleno  Relleno para 
Subyacen
Balasto  Sub‐balasto  Subrasante  Corte  material  Relleno  material del  zonas  Despalme  Desmonte 
te 
Subtramo  Cadenamiento  del FIT  FIT  encharcables 
(m3)  (m3)  (m3)  (m3)  (m3)  (m3)  (m3)  (m3)  (m3)  (m3)   (ha) 

TRAMO 1  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

5000 + 000 – 
TRAMO 2  98,771.90  129,555.10  190,943.07  15,454.10  148,691.6 835,819.10  148,691.61  0.00  0.00  210,083.70  70.82 
5043+000 

TRAMO 3  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

TRAMO 4  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
5071+500 – 
TRAMO 5  19,048.60  25,867.10  38,082.35  1,737.50  0.00  298,846.20  0.00  0.00  0.00  44,699.70  14.46 
6006+000 
TRAMO 6  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
6017+000 AL 
TRAMO 7  43,145.90  49,060.90  71,127.47  1,506.00  25,503.68 473,969.10  25,503.68  8,823.50  34,950.40  90,431.50  25.72 
6030+000 
TRAMO 8  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
6036+800–  139,507.8
TRAMO 9  136,310.50  195,020.50  9,459.10  0.00  726,949.30  0.00  21,216.20  87,101.30  191,348.00  61.40 
6067+000  0 
TRAMO 10  VARIANTE  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
Ladero 
5007+720  3,833.10  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
5007 
Ladero 
5043+390  1,022.10  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
5043 
Maxcanú 
   990.10  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
derecha 

Maxcanú 
   1,390.70  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
izquierda 
Maxcanú 
culatón     850.60  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
derecho 
Maxcanú 
culatón     849.50  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
izquierdo 
Ladero 
5073+080  3,832.60  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
5073 
Via Aux BM     1,187.30  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
Ladero 
6020+500  3,833.20  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
6020 
Ladero 
6040+680  4,375.40  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 
6040 
TOTAL=  322,638.80  340,793.60  495,173.39  28,156.70  174,195.29  2,335,583.70  174,195.29  30,039.70  122,051.70  536,562.90  172.39 

775 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

En la  tabla anterior, en las vías auxiliares, laderos y estaciones, se puede observar que todas las 
cantidades excepto el balasto, aparecen como un guión (‐), esto es porque ya se ha considerado en 
la volumetría de cada uno de los tramos. 

9. CONCLUSIONES Y RECOMENDACIONES 

 La  zona  atravesada  por  el  tramo  3  del  Tren  Maya  constituye  hidrogeológicamente  una 
cuenca  criptorreica  en  donde  el  agua  de  pluviometría  es  rápidamente  infiltrada  por  el 
terreno, no existiendo una escorrentía superficial continua. 

 La hidrogeología subterránea está constituida por un acuífero complejo en el que interviene 
la karstificación del macizo rocoso, la acumulación de agua en zonas de suelos residuales 
granulares,  y  la  existencia  de  zonas  de  fallas  y  fracturas  que  constituyen  un  acuífero 
secundario asociado a los otros dos acuíferos, y son la principal causa de la infiltración del 
agua superficial hacia el subsuelo. 

 El espesor de la capa de balasto y sub‐balasto será de 30 cm y 30 cm respectivamente. El 
análisis y diseño de estos concluyen que con ese arreglo de espesores es más que suficiente 
para las cargas y condiciones estudiadas. 

 Se  incluyen  en  este  documento  las  tablas  con  las  recomendaciones  geotécnicas  que  se 
usarán para la construcción de la curva‐masa y las observaciones correspondientes 

 Se definen los lineamientos generales del procedimiento constructivo para las terracerías, 
así como la actuación del recubrimiento vegetal de taludes. 

 Se presenta un resumen de los volúmenes generados por los movimientos de tierras. 

 Se presentan los bancos de materiales que, derivado el análisis realizado por laboratorios 
certificados, han arrojado que su material es aprovechable pata terraplén, subrasante y sub‐
balasto.  Además,  se  han  presentado  únicamente  los  bancos  a  los  cuales  se  pudo  tener 
acceso. 

 Este informe de Terracerías implica los alcances de un Proyecto ejecutivo, sin embargo, no 
es  limitativo.  Cualquier  cambio  de  variantes  como,  tipo  de  material  rodante,  cambio  de 
trazado, variantes topográficas, entre otros, serán causa de modificaciones al proyecto y sus 
movimientos de tierras. 

   

776 
 
  
INFORME DE TERRACERÍAS 
PROYECTO EJECUTIVO TRAMO 3: TREN MAYA 

ANEXO 1: FICHAS DE BANCOS DE MATERIALES 

ANEXO 2: RESUMEN DE ANÁLSIS DE LOS MATERIALES 

ANEXO 3: ACTAS DE ENSAYOS DE LABORATORIO 

777 
 