DIAGRAMA DE CARGA (PI-03) DERIVACION A PLANTA

PROCESADORA "AGROINDUSTRIA D*MATEO SAC"


NDO DE DERIVACION 41947

DERV AGROINDUSTRIA
D*MATEO S.A.C.
22.9 kV
u(L1)=99.12 %
u(L2)=98.75 %
u(L3)=99.02 %

L-001
AAAC 3 35 22.9KV
2.83 km
P(L1)=40.999 kW
Q(L1)=21.427 kvar
Ploss(L1)=0.002 kW
Qloss(L1)=-0.073 kvar
P(L2)=40.891 kW
Q(L2)=21.265 kvar
Ploss(L2)=0.002 kW
Qloss(L2)=-0.073 kvar
P(L3)=41.004 kW
Q(L3)=21.324 kvar
Ploss(L3)=0.001 kW
Qloss(L3)=-0.073 kvar
Carga=2.21 %

Ndo SS.EE. Agroindustria


D*MATEO S.A.C.
22.9 kV
u(L1)=99.11 %
u(L2)=98.74 %
u(L3)=99.02 %

SS.EE. AGROINDUSTRIA
D*MATEO S.A.C.
0.050MVA 22.9/0.380
Tap=3

Ndo Carga Agroindustria


D*MATEO SAC
0.38 kV
u(L1)=96.14 %
u(L2)=96.03 %
u(L3)=96.16 %
Carga Agroindustria
D*MATEO SAC
CARGA RSTN
P(L1)=40.000 kW
PF(L1)=0.900
P(L2)=40.000 kW
PF(L2)=0.900
P(L3)=40.000 kW
PF(L3)=0.900

Project: C A C H I M A Y O - 03 creado J.L.C.J.

modificado
modificado

Variant: DIAGRAMA DE CARGA modificado


modificado

DERIVACION A AGROINDUSTRIA
D*MATEO SAC – CACHIMAYO "

BCP Busarello + Cott + Partner Date: 01-Mayo-2018