N° Partida Descripción de la partida Unid. Metrado C.U. P.

Parcial
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2 EXCAVACIONES
OE.2.1.2.2 Excavaciomes Manuales m3 100.00 16.20 1,620.00
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.1 Cimiento Corridos C°1:10+30%P.M. m3 100.00 91.43 9,143.00
OE.2.2.6 SOBRECIMIENTOS
OE.2.2.6.1 Concreto en sobrecimientos m3 50.00 131.98 6,599.00
OE.2.2.6.2 Encofrado y desencofrado m2 20.00 22.20 444.00
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.7 COLUMNAS
OE.2.3.7.1 Concreto f'c=175kg/cm2 m3 10.00 207.41 2,074.10
OE.2.3.7.2 Encofrado y desencofrado m2 3.00 25.91 77.73
OE.2.3.7.3 Acero Fy=4200 Kg/cm2 Kg 100.00 2.56 256.00
OE.3 ARQUITECTURA
OE.3.1 MUROS Y TABIQUES DE ALNAÑILERIA
OE.3.1.1 Muro de ladrillo KK Artesanal Soga m2 200.00 27.34 5,468.00
COSTO DIRECTO 25,681.83
G.G Y Utilidad (15%) 3851.8395
Sub Total 29,530.77
IGV (18%) 5,316.14
TOTAL PRESUPUESTO 34,850.24

IU
MANO DE OBRA 47
CEMENTO PORTLAND TIPO I 21
INDICE GENERAL 39
BLOQUE Y LADRILLO 17
AGREGADO GRUESO 5
HORMIGON 38
MADERA NACIONAL E° y C° 43
HERRAMIENTA MANUAL 37
AGREGADO FINO 4
ACERO CORRUGADO 3
ACERO LISO 2

MONOMIO DESCRIPCION
MO J MANO DE OBRA
C C CEMENTO PORTLAND TIPO I
L L LADRILLO KK
AG AH AGREGADO GRUESO
A HORMIGON
IPC UG INDICE GENERAL
INDICE UNIFICADO
47 17 4 43 21

1,573.00

2,552.00 3,900.00

2,800.00 2,372.50
162.80 260.80

715.20 75.00 1,007.50


42.96 29.88
86.00

2,446.00 2,340.00 96.00 248.00 260.00


10,377.96 2,340.00 171.00 538.68 7,540.00
0.35143 0.07924 0.00579 0.01824 0.25533
35.14% 7.92% 0.58% 1.82% 25.53%
1 4 9 7 2

IMPORTE % INCIDENCIA 1° AGRUPAMIENTO COEF° ACUM AGRUPAMIENTO


10,377.96 0.35143 1 0.35143 MO
7,540.00 0.25533 2 0.26146 C
3,851.84 0.13043 3 0.13043 UG
2,340.00 0.07924 4 0.10824 L
2,120.00 0.07179 5 0.07758 AH
2,092.50 0.07086 6 0.07086
538.68 0.01824 4 1.00000
317.59 0.01075 4
171.00 0.00579 5
158.00 0.00535 2
23.20 0.00079 2

DESCRIPCION IU COEFICIENTE INCIDENCIA % INCIDENCIA


MANO DE OBRA 47 0.351 100%
EMENTO PORTLAND TIPO I 21 0.261 100%
LADRILLO KK 17 0.108 100%
AGREGADO GRUESO 5 52.26
0.148
HORMIGON 38 47.74
INDICE GENERAL 39 0.130 100%
1.000

K= 0.351Jr/Jo + 0.261Cr/Co + 0.108Lr/Lo + 0.148AHr/Aho + 0.130UGr/Ugo


CE UNIFICADO
37 2 5 38 3 39

47.00

77.00 1,250.00 1,365.00

84.00 615.00 727.50


4.8 15.60

21.50 255.00
1.29 3.60
8.00 4.00 158.00

74.00
317.59 23.20 2,120.00 2,092.50 158.00 3851.8395 29,530.77
0.01075 0.00079 0.07179 0.07086 0.00535 0.13043 1.00000
1.08% 0.08% 7.18% 7.09% 0.54% 13.04%
8 11 5 6 10 3

COEF° ACUM ORDEN M.


0.351 1
0.261 2
0.130 5
0.108 3
0.148 4
1.000
o + 0.130UGr/Ugo