Está en la página 1de 116

FORMATO PRESUPUESTO PROYECTO MEJORAMIENTO PAVIMENTO CALLE GALVEZ 180 días de corrido

ITEM DESCRIPCION UN CANTIDAD


P. UNITARIO P. TOTAL
A OBRAS DE INICIO DE FAENA
1 INSTALACION DE FAENAS GL 1 22,795,205 22,795,205
2 SEÑALIZACIONES PROVISORIAS GL 1 377,210 377,210
3 LABORATORIO DE CONTROL TECNICO uni 6 1,500,000 9,000,000
SUBTOTAL ITEM A 32,172,415

B OBRAS DE PAVIMENTACION
1 EXCAVACION Y TRANSPORTE BOTADERO M3 6,221 5,891 36,649,197
2 RELLENOS COMPACTADOS M3 249 24,558 6,114,942
3 PREPARACION DE LA SUBRASANTE M2 8,700 3,171 27,585,090
4 SUMINISTRO Y COLOCACION DE SOLERAS tipo A ML 2,320 8,589 19,926,387
5 SUBBASE GRANULAR CBR> 60 E= 15 cm M2 8,700 7,280 63,336,000
6 BASE GRANULAR CBR >60 E= 30cm M2 8,700 10,704 93,120,450
7 PAVIMENTO HCV E=18cm M2 7,540 14,476 109,145,546
8 SELLO DE JUNTAS GL 1 2,671,200 2,671,200

13 OBRAS DE DEMARCACION M2 81 20,302 1,644,422


14 SEÑALETICA VERTICAL CEDA EL PASO UN 10 488,200 4,882,000
15 SUMINISTRO Y COLOCACION SEÑALETICA 2 LEYEN UN 20 800,428 16,008,550
16 SEÑALETICA VERTICAL PARADERO UN 2 160,151 320,301
17 SEÑALETICA LIMITE DE VELOCIDAD UN 4 202,130 808,520
Sub Total B 382,212,605

Sub-Total (A+B) 414,385,020


Gastos Generales 23.28% 96,468,833
Utilidades 8.42% 34,891,219
Total Neto 545,745,071
I.V.A. 19% 103,691,564
TOTAL 649,436,635
ITEM DESCRIPCION UN CANTIDAD
A OBRAS DE INICIO DE FAENA
1 INSTALACION DE FAENAS GL 1
2 SEÑALIZACIONES PROVISORIAS GL 1
3 LABORATORIO DE CONTROL TECNICO uni 6

B OBRAS DE PAVIMENTACION
1 EXCAVACION Y TRANSPORTE BOTADERO M3 6221
2 RELLENOS COMPACTADOS M3 249
3 PREPARACION DE LA SUBRASANTE M2 8700
4 SUMINISTRO Y COLOCACION DE SOLERAS tipo A ML 2320
5 SUBBASE GRANULAR CBR> 60 E= 15 cm M2 8700
6 BASE GRANULAR CBR >60 E= 30cm M2 8700
7 PAVIMENTO HCV E=18cm M2 7540
8 SELLO DE JUNTAS GL 1

13 OBRAS DE DEMARCACION M2 81
14 SEÑALETICA VERTICAL CEDA EL PASO UN 10
15 SUMINISTRO Y COLOCACION SEÑALETICA 2 LEYENDAS UN 20
16 SEÑALETICA VERTICAL PARADERO UN 2
17 SEÑALETICA LIMITE DE VELOCIDAD UN 4

Sub-Total (A+B)
Gastos Generales
Utilidades
Total Neto
I.V.A.
TOTAL

N° PARCIAL ACUMULADO
1 $ 2,822,940 $ 2,822,940
2 $ 5,969,691 $ 8,792,632
3 $ 6,126,485 $ 14,919,116
4 $ 7,067,245 $ 21,986,361
5 $ 8,969,665 $ 30,956,026
6 $ 16,899,507 $ 47,855,534
7 $ 22,296,974 $ 70,152,507
8 $ 28,719,074 $ 98,871,581
9 $ 24,411,937 $ 123,283,518
10 $ 16,029,504 $ 139,313,023
11 $ 16,029,504 $ 155,342,527
12 $ 27,924,318 $ 183,266,846
13 $ 28,156,787 $ 211,423,633
14 $ 28,626,112 $ 240,049,745
15 $ 25,751,879 $ 265,801,624
16 $ 25,751,879 $ 291,553,502
17 $ 25,751,879 $ 317,305,381
18 $ 27,251,879 $ 344,557,260
19 $ 21,383,879 $ 365,941,138
20 $ 18,081,571 $ 384,022,709
21 $ 22,593,861 $ 406,616,570
22 $ 7,768,450 $ 414,385,020
23 $ 414,385,020
7/1/2020 7/2/2020 7/3/2020
Lunes Martes Miercoles
P. UNITARIOP. TOTAL DURACIÓN Valor dia 1 2 3

$22,795,205 $ 22,795,205 154 $ 148,021 $ 148,021 $ 148,021 $ 148,021


$ 377,210 $ 377,210 5 $ 75,442 $ 75,442 $ 75,442 $ 75,442
$ 1,500,000 $ 9,000,000 6 $1,500,000

$ 5,891 $ 36,649,197 52 $ 704,792


$ 24,558 $ 6,114,942 39 $ 156,793
$ 3,171 $ 27,585,090 29 $ 951,210
$ 8,589 $ 19,926,387 58 $ 343,558
$ 7,280 $ 63,336,000 87 $ 728,000
$ 10,704 $ 93,120,450 87 $1,070,350
$ 14,476 $ 109,145,546 63 $1,732,469
$ 2,671,200 $ 2,671,200 12 $ 222,600

$ 20,302 $ 1,644,422 10 $ 164,442


$ 488,200 $ 4,882,000 3 $1,627,333
$ 800,428 $ 16,008,550 10 $1,600,855
$ 160,151 $ 320,301 1 $ 320,301
$ 202,130 $ 808,520 1 $ 808,520

$ 223,463 $ 223,463 $ 223,463

$ 414,385,020
23.28% $ 96,468,833
8.4% $ 34,891,219
$ 545,745,071
19% $ 103,691,564
$ 649,436,635
7/4/2020 7/5/2020 7/8/2020 7/9/2020 7/10/2020 7/11/2020 7/12/2020
Jueves Viernes Lunes Martes Miercoles Jueves Viernes
4 5 6 7 8 9 10

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021


$ 75,442 $ 75,442

$ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792

$ 223,463 $ 223,463 $ 852,813 $ 852,813 $ 852,813 $ 852,813 $ 852,813


N°1 ESTADO DE PAGO $ 2,822,940
TOTAL NETO $ 2,822,940
IVA 19% $ 536,359
TOTAL A PAGAR $ 3,359,299
7/15/2020 7/16/2020 7/17/2020 7/18/2020 7/19/2020 7/22/2020 7/23/2020 7/24/2020
Lunes Martes Miercoles Jueves Viernes Lunes Martes Miercoles
11 12 13 14 15 16 17 18

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792

$ 852,813 $ 852,813 $ 852,813 $ 852,813 $ 852,813 $ 852,813 $ 852,813 $ 852,813


N°2 ESTADO DE $5,969,691
TOTAL NETO$5,969,691
IVA 19% $1,134,241
TOTAL A P $7,103,933
7/25/2020 7/26/2020 7/29/2020 7/30/2020 7/31/2020 8/1/2020 8/2/2020 8/5/2020
Jueves Viernes Lunes Martes Miercoles Jueves Viernes Lunes
19 20 21 22 23 24 25 26

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792


$ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793

$ 852,813 $ 852,813 $ 1,009,606 $ 1,009,606 $ 1,009,606 $ 1,009,606 $ 1,009,606 $ 1,009,606


N°3 ESTADO DE $6,126,485 N°4
TOTAL NETO$6,126,485
IVA 19% $1,164,032
TOTAL A P $7,290,517
8/6/2020 8/7/2020 8/8/2020 8/9/2020 8/12/2020 8/13/2020 8/14/2020 8/15/2020
Martes Miercoles Jueves Viernes Lunes Martes Miercoles Jueves
27 28 29 30 31 32 33 34

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792


$ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793
$ 951,210

$ 1,009,606 $ 1,009,606 $ 1,009,606 $ 1,009,606 $ 1,009,606 $ 1,009,606 $ 1,009,606 $ 1,960,816


ESTADO DE $7,067,245 N°5 ESTADO DE
TOTAL NETO$7,067,245 TOTAL NETO
IVA 19% $1,342,777 IVA 19%
TOTAL A P $8,410,022 TOTAL A P
8/16/2020 8/19/2020 8/20/2020 8/21/2020 8/22/2020 8/23/2020 8/26/2020
Viernes Lunes Martes Miercoles Jueves Viernes Lunes
35 36 37 38 39 40 41

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792


$ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793
$ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210
$ 343,558 $ 343,558 $ 343,558 $ 343,558
$ 728,000

$ 1,960,816 $ 1,960,816 $ 1,960,816 $ 2,304,375 $ 2,304,375 $ 2,304,375 $ 3,032,375


$ 8,969,665 N°6 ESTADO DE PAGO
$ 8,969,665 TOTAL NETO
$ 1,704,236 IVA 19%
$ 10,673,901 TOTAL A PAGAR
8/27/2020 8/28/2020 8/29/2020 8/30/2020 9/2/2020 9/3/2020 9/4/2020
Martes Miercoles Jueves Viernes Lunes Martes Miercoles
42 43 44 45 46 47 48

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792


$ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793
$ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210
$ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558
$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000

$ 3,032,375 $ 3,032,375 $ 3,032,375 $ 3,032,375 $ 3,032,375 $ 3,032,375 $ 3,032,375


$ 16,899,507 N°7 ESTADO DE PAGO
$ 16,899,507 TOTAL NETO
$ 3,210,906 IVA 19%
$ 20,110,413 TOTAL A PAGAR
9/5/2020 9/6/2020 9/9/2020 9/10/2020 9/11/2020 9/12/2020 9/13/2020
Jueves Viernes Lunes Martes Miercoles Jueves Viernes
49 50 51 52 53 54 55

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792 $ 704,792


$ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793 $ 156,793
$ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210
$ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558
$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000
$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350

$ 4,102,725 $ 4,102,725 $ 4,102,725 $ 4,102,725 $ 4,102,725 $ 4,102,725 $ 4,102,725


$ 22,296,974 N°8 ESTADO DE PAGO
$ 22,296,974 TOTAL NETO
$ 4,236,425 IVA 19%
$ 26,533,399 TOTAL A PAGAR
9/16/2020 9/17/2020 9/18/2020 9/19/2020 9/20/2020 9/23/2020 9/24/2020
Lunes Martes Miercoles Jueves Viernes Lunes Martes
56 57 58 59 60 61 62

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 1,500,000

$ 704,792 $ 704,792
$ 156,793 $ 156,793 $ 156,793 $ 156,793
$ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210 $ 951,210
$ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558
$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000
$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350

$ 4,102,725 $ 4,102,725 $ 3,397,933 $ 3,397,933 $ 3,241,139 $ 3,241,139 $ 4,741,139


$ 28,719,074 N°9 ESTADO DE PAGO
$ 28,719,074 TOTAL NETO
$ 5,456,624 IVA 19%
$ 34,175,698 TOTAL A PAGAR
9/25/2020 9/26/2020 9/27/2020 9/30/2020 10/1/2020 10/2/2020 10/3/2020
Miercoles Jueves Viernes Lunes Martes Miercoles Jueves
63 64 65 66 67 68 69

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558


$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000
$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350

$ 2,289,929 $ 2,289,929 $ 2,289,929 $ 2,289,929 $ 2,289,929 $ 2,289,929 $ 2,289,929


$ 24,411,937 N°10 ESTADO DE PAGO
$ 24,411,937 TOTAL NETO
$ 4,638,268 IVA 19%
$ 29,050,205 TOTAL A PAGAR
10/4/2020 10/7/2020 10/8/2020 10/9/2020 10/10/2020 10/11/2020 10/14/2020
Viernes Lunes Martes Miercoles Jueves Viernes Lunes
70 71 72 73 74 75 76

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558


$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000
$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350

$ 2,289,929 $ 2,289,929 $ 2,289,929 $ 2,289,929 $ 2,289,929 $ 2,289,929 $ 2,289,929


$ 16,029,504 N°11 ESTADO DE PAGO
$ 16,029,504 TOTAL NETO
$ 3,045,606 IVA 19%
$ 19,075,110 TOTAL A PAGAR
10/15/2020 10/16/2020 10/17/2020 10/18/2020 10/21/2020 10/22/2020 10/23/2020
Martes Miercoles Jueves Viernes Lunes Martes Miercoles
77 78 79 80 81 82 83

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$1,500,000

$ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558


$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000
$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350
$1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469

$ 2,289,929 $ 2,289,929 $ 4,022,398 $ 4,022,398 $ 5,522,398 $ 4,022,398 $ 4,022,398


$ 16,029,504 N°12 ESTADO DE PAGO
$ 16,029,504 TOTAL NETO
$ 3,045,606 IVA 19%
$ 19,075,110 TOTAL A PAGAR
10/24/2020 10/25/2020 10/28/2020 10/29/2020 10/30/2020 10/31/2020 11/1/2020
Jueves Viernes Lunes Martes Miercoles Jueves Viernes
84 85 86 87 88 89 90

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558


$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000
$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350
$ 1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469

$ 4,022,398 $ 4,022,398 $ 4,022,398 $ 4,022,398 $ 4,022,398 $ 4,022,398 $ 4,022,398


$ 27,924,318 N°13 ESTADO DE PAGO
$ 27,924,318 TOTAL NETO
$ 5,305,620 IVA 19%
$ 33,229,939 TOTAL A PAGAR
11/4/2020 11/5/2020 11/6/2020 11/7/2020 11/8/2020 11/11/2020 11/12/2020
Lunes Martes Miercoles Jueves Viernes Lunes Martes
91 92 93 94 95 96 97

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$1,500,000

$ 343,558 $ 343,558 $ 343,558 $ 343,558 $ 343,558


$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000
$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350
$ 1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469

$ 4,022,398 $ 5,522,398 $ 4,022,398 $ 4,022,398 $ 4,022,398 $ 3,678,840 $ 3,678,840


$ 28,156,787 N°14 ESTADO DE PAGO
$ 28,156,787 TOTAL NETO
$ 5,349,790 IVA 19%
$ 33,506,577 TOTAL A PAGAR
11/13/2020 11/14/2020 11/15/2020 11/18/2020 11/19/2020 11/20/2020 11/21/2020
Miercoles Jueves Viernes Lunes Martes Miercoles Jueves
98 99 100 101 102 103 104

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000


$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350
$ 1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469

$ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840


$ 28,626,112 N°15 ESTADO DE PAGO
$ 28,626,112 TOTAL NETO
$ 5,438,961 IVA 19%
$ 34,065,074 TOTAL A PAGAR
11/22/2020 11/25/2020 11/26/2020 11/27/2020 11/28/2020 11/29/2020 12/2/2020
Viernes Lunes Martes Miercoles Jueves Viernes Lunes
105 106 107 108 109 110 111

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000


$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350
$ 1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469

$ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840


$ 25,751,879 N°16 ESTADO DE PAGO
$ 25,751,879 TOTAL NETO
$ 4,892,857 IVA 19%
$ 30,644,736 TOTAL A PAGAR
12/3/2020 12/4/2020 12/5/2020 12/6/2020 12/9/2020 12/10/2020 12/11/2020
Martes Miercoles Jueves Viernes Lunes Martes Miercoles
112 113 114 115 116 117 118

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000


$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350
$ 1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469

$ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840


$ 25,751,879 N°17 ESTADO DE PAGO
$ 25,751,879 TOTAL NETO
$ 4,892,857 IVA 19%
$ 30,644,736 TOTAL A PAGAR
12/12/2020 12/13/2020 12/16/2020 12/17/2020 12/18/2020 12/19/2020 12/20/2020
Jueves Viernes Lunes Martes Miercoles Jueves Viernes
119 120 121 122 123 124 125

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$1,500,000

$ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000 $ 728,000


$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350
$ 1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469

$ 3,678,840 $ 5,178,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840 $ 3,678,840


$ 25,751,879 N°18 ESTADO DE PAGO
$ 25,751,879 TOTAL NETO
$ 4,892,857 IVA 19%
$ 30,644,736 TOTAL A PAGAR
12/23/2020 12/24/2020 12/25/2020 12/26/2020 12/27/2020 12/30/2020 12/31/2020
Lunes Martes Miercoles Jueves Viernes Lunes Martes
126 127 128 129 130 131 132

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 728,000 $ 728,000
$ 1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $1,070,350 $ 1,070,350
$ 1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469

$ 3,678,840 $ 3,678,840 $ 2,950,840 $ 2,950,840 $ 2,950,840 $ 2,950,840 $ 2,950,840


$ 27,251,879 N°19 ESTADO DE PAGO
$ 27,251,879 TOTAL NETO
$ 5,177,857 IVA 19%
$ 32,429,736 TOTAL A PAGAR
1/1/2021 1/2/2021 1/3/2021 1/6/2021 1/7/2021 1/8/2021 1/9/2021
Miercoles Jueves Viernes Lunes Martes Miercoles Jueves
133 134 135 136 137 138 139

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$1,500,000

$ 1,070,350 $1,070,350 $1,070,350


$ 1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $1,732,469 $ 1,732,469
$ 222,600 $ 222,600 $ 222,600 $ 222,600

$ 2,950,840 $ 4,450,840 $ 2,950,840 $ 2,103,090 $ 2,103,090 $ 2,103,090 $ 2,103,090


$ 21,383,879 N°20 ESTADO DE PAGO
$ 21,383,879 TOTAL NETO
$ 4,062,937 IVA 19%
$ 25,446,816 TOTAL A PAGAR
1/10/2021 1/13/2021 1/14/2021 1/15/2021 1/16/2021 1/17/2021 1/20/2021
Viernes Lunes Martes Miercoles Jueves Viernes Lunes
140 $ 141 142 143 144 145 146

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$1,500,000

$ 1,732,469 $1,732,469
$ 222,600 $ 222,600 $ 222,600 $ 222,600 $ 222,600 $ 222,600 $ 222,600

$ 164,442 $ 164,442 $ 164,442 $ 164,442 $ 164,442 $ 164,442 $ 164,442


$1,627,333 $1,627,333 $1,627,333
$1,600,855 $1,600,855 $1,600,855 $1,600,855 $ 1,600,855
$ 320,301
$ 808,520

$ 2,267,532 $ 3,767,532 $ 2,135,918 $ 3,763,251 $ 3,763,251 $ 3,763,251 $ 3,264,739


$ 18,081,571 N°21 ESTADO DE PAGO
$ 18,081,571 TOTAL NETO
$ 3,435,498 IVA 19%
$ 21,517,069 TOTAL A PAGAR
1/21/2021 1/22/2021 1/23/2021 1/24/2021 1/27/2021 1/28/2021 1/29/2021
Martes Miercoles Jueves Viernes Lunes Martes Miercoles
147 148 149 150 151 152 153

$ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021 $ 148,021

$ 222,600

$ 164,442 $ 164,442 $ 164,442

$ 1,600,855 $1,600,855 $1,600,855 $1,600,855 $1,600,855

$ 2,135,918 $ 1,913,318 $ 1,913,318 $ 1,748,876 $ 1,748,876 $ 148,021 $ 148,021


$ 22,593,861 N°22 ESTADO DE PAGO
$ 22,593,861 TOTAL NETO
$ 4,292,834 IVA 19%
$ 26,886,695 TOTAL A PAGAR
1/30/2021
Jueves
154

$ 148,021

$ 148,021
$ 7,768,450
$ 7,768,450
$ 1,476,005
$ 9,244,455
ITEM DESCRIPCION UNCANTIDADP. UNITARIO P. TOTAL
A OBRAS DE INICIO DE FAENA
1 INSTALACION DE FAENAS (4,2%) GL 1 22,795,205 22,795,205
2 SEÑALIZACIONES PROVISORIAS (1%) GL 1 377,210 377,210
3 LABORATORIO DE CONTROL TECNICO (2%) GL 1 1,500,000 9,000,000
B OBRAS DE PAVIMENTACION
1 EXCAVACION Y TRANSPORTE BOTADERO M3 6,221 5,891 36,649,197
2 RELLENOS COMPACTADOS M3 249 24,558 6,114,942
3 PREPARACION DE LA SUBRASANTE M2 8,700 3,171 27,585,090
4 SUMINISTRO Y COLOCACION DE SOLERAS tipML 2,320 8,589 19,926,387
5 SUBBASE GRANULAR CBR> 60 E= 15 cm M2 8,700 7,280 63,336,000
6 BASE GRANULAR CBR >60 E= 30cm M2 8,700 10,704 93,120,450
7 PAVIMENTO HCV E=18cm M2 7,540 14,476 109,145,546
SELLO DE JUNTAS GL 1 2,671,200 2,671,200
13 OBRAS DE DEMARCACION M2 81 20,302 1,644,422
14 SEÑALETICA VERTICAL CEDA EL PASO UN 10 488,200 4,882,000
15 SUMINISTRO Y COLOCACION SEÑALETICA 2 UN 20 800,428 16,008,550
16 SEÑALETICA VERTICAL PARADERO UN 2 160,151 320,301
17 SEÑALETICA LIMITE DE VELOCIDAD UN 4 202,130 808,520
Sub Total B 382,212,605

Sub-Total (A+B 414,385,020


Gastos Generales 23.28% 96,468,833
Utilidades 8.42% 34,891,219
Total Neto 545,745,071
I.V.A. 19% 103,691,564
TOTAL 649,436,635
N° Dias
1 2 3 4 5 6 7
154 x x x x x x x
5
6

52 1
39
29
58
87
87
63
12
10
3
10
1
1
8 9 10 11 12 13 14 15
x x x x x x x x
16 17 18 19 20 21 22 23
x x x x x x x x

1
24 25 26 27 28 29 30 31
x x x x x x x x
32 33 34 35 36 37 38 39
x x x x x x x x

1
1

85
40 41 42 43 44 45 46 47
x x x x x x x x

1 2
48 49 50 51 52 53 54 55
x x x x x x x x

1
56 57 58 59 60 61 62 63
x x x x x x x x

52
39
29

1 2 3 4 5
64 65 66 67 68 69 70 71
x x x x x x x x
72 73 74 75 76 77 78 79
x x x x x x x x

1
80 81 82 83 84 85 86 87
x x x x x x x x

1
88 89 90 91 92 93 94 95
x x x x x x x x

58
96 97 98 99 100 101 102 103
x x x x x x x
104 105 106 107 108 109 110 111
x x x x x x x x
112 113 114 115 116 117 118 119
x x x x x x x x
120 121 122 123 124 125 126 127
x x x x x x x x

87
128 129 130 131 132 133 134 135
x x x x x x x x

87

182
136 137 138 139 140 141 142 143
x x x x x x x x

63
1
1
1
1 2
144 145 146 147 148 149 150 151
x x x x x x x x

12
10
2 3
3 4 5 6 7 8 9 10
1
1
152 153 154
x x x
Estados de pago semanal
1a7
8 a 14
15 a 21
22 a 28
29 a 35
36 a 42
43 a 49
50 a 56
57 a 63
64 a 70
71 a 77
78 a 84
85 a 91
92 a 98
99 a 105
106 a 112
113 a 119
120 a 126
127 a 133
134 a 140
141 a 147
148 a 154

Estados de pago semanal


1a7
8 a 14
15 a 21
22 a 28
29 a 35
36 a 42
43 a 49
50 a 56
57 a 63
64 a 70
71 a 77
78 a 84
85 a 91
92 a 98
99 a 105
106 a 112
113 a 119
120 a 126
127 a 133
134 a 140
141 a 147
148 a 154

ITEM

1
2
3

1
2
3
4
5
6
7

13
14
15
16
17
ITEM

1
2
3

1
2
3
4
5
6
7

13
14
15
16
17

ITEM

1
2
3

1
2
3
4
5
6
7

13
14
15
16
17

ITEM

1
2
3

1
2
3
4
5
6
7

13
14
15
16
17
ITEM

1
2
3

1
2
3
4
5
6
7

13
14
15
16
17

ITEM

1
2
3
1
2
3
4
5
6
7

13
14
15
16
17
Avance financiero acumulado
$ 2,822,940
Avance financiero
$ 8,792,632
$450,000,000
$ 14,919,116
$ 21,986,361
$400,000,000
$ 30,956,026
$ 47,855,534
$350,000,000
$ 70,152,507
$ 98,871,581

Avance financiero acumulado


$300,000,000
$ 123,283,518
$ 139,313,023 $250,000,000
$ 155,342,527
$ 183,266,846 $200,000,000
$ 211,423,633
$ 240,049,745 $150,000,000
$
$ 265,801,624
$98,871,581
$ 291,553,502 $100,000,000
$70,152,507
$ 317,305,381
$47,855,534
$ 344,557,260 $50,000,000 $30,956,026
$21,986,361
$14,919,116
$ 365,941,138 $2,822,940$8,792,632
$-
$ 384,022,709 1a7 8 a 14 15 a 21 22 a 28 29 a 35 36 a 42 43 a 49 50 a 56
$ 406,616,570
$ 414,385,020

Estados de pago
$ 2,822,940
$ 5,969,691
$ 6,126,485
$ 7,067,245
$ 8,969,665
$ 16,899,507 $35,000,000
$ 22,296,974
$ 28,719,074 $30,000,000

$ 24,411,937
$25,000,000
$ 16,029,504 $22,29
$ 16,029,504 $20,000,000
Costos

$ 27,924,318 $16,899,507
$15,000,000
$ 28,156,787
$ 28,626,112 $10,000,000
$8,969,665
$7,067,245
$6,126,485
$5,969,691
$5,000,000
$2,822,940
$-
$20,000,000

Costos
$16,899,507
$15,000,000

$10,000,000
$8,969,665
$ 25,751,879 $7,067,245
$6,126,485
$5,969,691
$ 25,751,879 $5,000,000
$2,822,940
$ 25,751,879
$-
$ 27,251,879 1a7 8 a 14 15 a 21 22 a 28 29 a 35 36 a 42 43 a 49 50
$ 21,383,879
$ 18,081,571
$ 22,593,861
$ 7,768,450

ESTADO DE PAGO A LOS 30 DÍAS (1 a 28)


DESCRIPCION UN N° Dias
A OBRAS DE INICIO DE FAENA
INSTALACION DE FAENAS (4,2%) GL 154
SEÑALIZACIONES PROVISORIAS (1%) GL 5
LABORATORIO DE CONTROL TECNICO (2%) GL 6
B OBRAS DE PAVIMENTACION
EXCAVACION Y TRANSPORTE BOTADERO M3 52
RELLENOS COMPACTADOS M3 39
PREPARACION DE LA SUBRASANTE M2 29
SUMINISTRO Y COLOCACION DE SOLERAS tipo A ML 58
SUBBASE GRANULAR CBR> 60 E= 15 cm M2 87
BASE GRANULAR CBR >60 E= 30cm M2 87
PAVIMENTO HCV E=18cm M2 63
SELLO DE JUNTAS GL 12
OBRAS DE DEMARCACION M2 10
SEÑALETICA VERTICAL CEDA EL PASO UN 3
SUMINISTRO Y COLOCACION SEÑALETICA 2 LEYENDAS UN 10
SEÑALETICA VERTICAL PARADERO UN 1
SEÑALETICA LIMITE DE VELOCIDAD UN 1
ESTADO DE PAGO A LOS 60 DÍAS (29 a 56)
DESCRIPCION UN N° Dias
A OBRAS DE INICIO DE FAENA
INSTALACION DE FAENAS (4,2%) GL 154
SEÑALIZACIONES PROVISORIAS (1%) GL 5
LABORATORIO DE CONTROL TECNICO (2%) GL 6
B OBRAS DE PAVIMENTACION
EXCAVACION Y TRANSPORTE BOTADERO M3 52
RELLENOS COMPACTADOS M3 39
PREPARACION DE LA SUBRASANTE M2 29
SUMINISTRO Y COLOCACION DE SOLERAS tipo A ML 58
SUBBASE GRANULAR CBR> 60 E= 15 cm M2 87
BASE GRANULAR CBR >60 E= 30cm M2 87
PAVIMENTO HCV E=18cm M2 63
SELLO DE JUNTAS GL 12
OBRAS DE DEMARCACION M2 10
SEÑALETICA VERTICAL CEDA EL PASO UN 3
SUMINISTRO Y COLOCACION SEÑALETICA 2 LEYENDAS UN 10
SEÑALETICA VERTICAL PARADERO UN 1
SEÑALETICA LIMITE DE VELOCIDAD UN 1

ESTADO DE PAGO A LOS 90 DÍAS (57 a 84)


DESCRIPCION UN N° Dias
A OBRAS DE INICIO DE FAENA
INSTALACION DE FAENAS (4,2%) GL 154
SEÑALIZACIONES PROVISORIAS (1%) GL 5
LABORATORIO DE CONTROL TECNICO (2%) GL 6
B OBRAS DE PAVIMENTACION
EXCAVACION Y TRANSPORTE BOTADERO M3 52
RELLENOS COMPACTADOS M3 39
PREPARACION DE LA SUBRASANTE M2 29
SUMINISTRO Y COLOCACION DE SOLERAS tipo A ML 58
SUBBASE GRANULAR CBR> 60 E= 15 cm M2 87
BASE GRANULAR CBR >60 E= 30cm M2 87
PAVIMENTO HCV E=18cm M2 63
SELLO DE JUNTAS GL 12
OBRAS DE DEMARCACION M2 10
SEÑALETICA VERTICAL CEDA EL PASO UN 3
SUMINISTRO Y COLOCACION SEÑALETICA 2 LEYENDAS UN 10
SEÑALETICA VERTICAL PARADERO UN 1
SEÑALETICA LIMITE DE VELOCIDAD UN 1

ESTADO DE PAGO A LOS 120 DÍAS (85 a 112)


DESCRIPCION UN N° Dias
A OBRAS DE INICIO DE FAENA
INSTALACION DE FAENAS (4,2%) GL 154
SEÑALIZACIONES PROVISORIAS (1%) GL 5
LABORATORIO DE CONTROL TECNICO (2%) GL 6
B OBRAS DE PAVIMENTACION
EXCAVACION Y TRANSPORTE BOTADERO M3 52
RELLENOS COMPACTADOS M3 39
PREPARACION DE LA SUBRASANTE M2 29
SUMINISTRO Y COLOCACION DE SOLERAS tipo A ML 58
SUBBASE GRANULAR CBR> 60 E= 15 cm M2 87
BASE GRANULAR CBR >60 E= 30cm M2 87
PAVIMENTO HCV E=18cm M2 63
SELLO DE JUNTAS GL 12
OBRAS DE DEMARCACION M2 10
SEÑALETICA VERTICAL CEDA EL PASO UN 3
SUMINISTRO Y COLOCACION SEÑALETICA 2 LEYENDAS UN 10
SEÑALETICA VERTICAL PARADERO UN 1
SEÑALETICA LIMITE DE VELOCIDAD UN 1
ESTADO DE PAGO A LOS 150 DÍAS (113 a 140)
DESCRIPCION UN N° Dias
A OBRAS DE INICIO DE FAENA
INSTALACION DE FAENAS (4,2%) GL 154
SEÑALIZACIONES PROVISORIAS (1%) GL 5
LABORATORIO DE CONTROL TECNICO (2%) GL 6
B OBRAS DE PAVIMENTACION
EXCAVACION Y TRANSPORTE BOTADERO M3 52
RELLENOS COMPACTADOS M3 39
PREPARACION DE LA SUBRASANTE M2 29
SUMINISTRO Y COLOCACION DE SOLERAS tipo A ML 58
SUBBASE GRANULAR CBR> 60 E= 15 cm M2 87
BASE GRANULAR CBR >60 E= 30cm M2 87
PAVIMENTO HCV E=18cm M2 63
SELLO DE JUNTAS GL 12
OBRAS DE DEMARCACION M2 10
SEÑALETICA VERTICAL CEDA EL PASO UN 3
SUMINISTRO Y COLOCACION SEÑALETICA 2 LEYENDAS UN 10
SEÑALETICA VERTICAL PARADERO UN 1
SEÑALETICA LIMITE DE VELOCIDAD UN 1

ESTADO DE PAGO A LOS 180 DÍAS (141 a 154)


DESCRIPCION UN N° Dias
A OBRAS DE INICIO DE FAENA
INSTALACION DE FAENAS (4,2%) GL 154
SEÑALIZACIONES PROVISORIAS (1%) GL 5
LABORATORIO DE CONTROL TECNICO (2%) GL 6
B OBRAS DE PAVIMENTACION
EXCAVACION Y TRANSPORTE BOTADERO M3 52
RELLENOS COMPACTADOS M3 39
PREPARACION DE LA SUBRASANTE M2 29
SUMINISTRO Y COLOCACION DE SOLERAS tipo A ML 58
SUBBASE GRANULAR CBR> 60 E= 15 cm M2 87
BASE GRANULAR CBR >60 E= 30cm M2 87
PAVIMENTO HCV E=18cm M2 63
SELLO DE JUNTAS GL 12
OBRAS DE DEMARCACION M2 10
SEÑALETICA VERTICAL CEDA EL PASO UN 3
SUMINISTRO Y COLOCACION SEÑALETICA 2 LEYENDAS UN 10
SEÑALETICA VERTICAL PARADERO UN 1
SEÑALETICA LIMITE DE VELOCIDAD UN 1
Avance financiero acumulado

$384,
$365,941,138
$344,557,260
$317,305,381
$291,553,502
$265,801,624
$240,049,745
$211,423,633
$183,266,846
$155,342,527
$139,313,023
$123,283,518
$98,871,581
$70,152,507
$47,855,534
0,956,026

29 a 35 36 a 42 43 a 49 50 a 56 57 a 63 64 a 70 71 a 77 78 a 84 85 a 91 92 a 98 99 a 105 106 a 112 113 a 119 120 a 126 127 a 133 134

Estados de pago semanal

Estados de pago

$28,719,074 $28,626,112
$28,156,787
$27,924,318 $27,251,879
$25,751,879
$25,751,879
$25,751,879
$24,411,937
$22,296,974 $
$21,383,879
$18,081,57
$16,899,507
$16,029,504
$16,029,504

$8,969,665
$7,067,245
6,126,485
$18,081,57
$16,899,507
$16,029,504
$16,029,504

$8,969,665
$7,067,245
6,126,485

22 a 28 29 a 35 36 a 42 43 a 49 50 a 56 57 a 63 64 a 70 71 a 77 78 a 84 85 a 91 92 a 98 99 a 105 106 a 113 a 120 a 127 a 134 a 141 a


112 119 126 133 140 147

Estados de pago

PAGO A LOS 30 DÍAS (1 a 28)


P. TOTAL avance acumulado anterior avance actual parcial avance acumulado

$ 22,795,205 0% 18% 18%


$ 377,210 0% 100% 100%
$ 1,500,000 100% 0% 100%
0%
$ 36,649,197 0% 44% 44%
$ 6,114,942 0% 20.60% 20.60%
$ 27,585,090 0% 0% 0%
$ 19,926,387 0% 0% 0%
$ 63,336,000 0% 0% 0%
$ 93,120,450 0% 0% 0%
$ 109,145,546 0% 0% 0%
$ 2,671,200 0% 0% 0%
$ 1,644,422 0% 0% 0%
$ 4,882,000 0% 0% 0%
$ 16,008,550 0% 0% 0%
$ 320,301 0% 0% 0%
$ 808,520 0% 0% 0%
ESTADO DE PAGO
Retenciones 5%
TOTAL NETO
IVA 19%
GASTOS GENERALES 10%
UTILIDADES 15%
TOTAL A PAGO
PAGO A LOS 60 DÍAS (29 a 56)
P. TOTAL avance acumulado anterior avance actual parcial avance acumulado

$ 22,795,205 18% 18% 36%


$ 377,210 100% 0% 100%
$ 1,500,000 0% 0% 0%

$ 36,649,197 44% 54% 98%


$ 6,114,942 21% 72% 93%
$ 27,585,090 0% 79% 79%
$ 19,926,387 0% 33% 33%
$ 63,336,000 0% 18% 18%
$ 93,120,450 0% 9% 9%
$ 109,145,546 0% 0% 0%
$ 2,671,200 0% 0% 0%
$ 1,644,422 0% 0% 0%
$ 4,882,000 0% 0% 0%
$ 16,008,550 0 0% 0%
$ 320,301 0% 0% 0%
$ 808,520 0% 0% 0%
ESTADO DE PAGO
Retenciones 5%
TOTAL NETO
IVA 19%
GASTOS GENERALES 10%
UTILIDADES 15%
TOTAL A PAGO

PAGO A LOS 90 DÍAS (57 a 84)


P. TOTAL avance acumulado anterior avance actual parcial avance acumulado

$ 22,795,205 36% 18% 55%


$ 377,210 100% 0% 100%
$ 1,500,000 0% 17% 33%

$ 36,649,197 98% 2% 100%


$ 6,114,942 93% 8% 101%
$ 27,585,090 79% 21% 100%
$ 19,926,387 33% 48% 81%
$ 63,336,000 18% 32% 51%
$ 93,120,450 9% 32% 41%
$ 109,145,546 0% 10% 10%
$ 2,671,200 0% 0% 0%
$ 1,644,422 0% 0% 0%
$ 4,882,000 0% 0% 0%
$ 16,008,550 0 0% 0%
$ 320,301 0% 0% 0%
$ 808,520 0% 0% 0%
ESTADO DE PAGO
Retenciones 5%
TOTAL NETO
IVA 19%
GASTOS GENERALES 10%
UTILIDADES 15%
TOTAL A PAGO

AGO A LOS 120 DÍAS (85 a 112)


P. TOTAL avance acumulado anterior avance actual parcial avance acumulado

$ 22,795,205 55% 18% 73%


$ 377,210 100% 0% 100%
$ 1,500,000 33% 17% 50%

$ 36,649,197 100% 0% 100%


$ 6,114,942 101% 0% 101%
$ 27,585,090 100% 0% 100%
$ 19,926,387 81% 19% 100%
$ 63,336,000 51% 32% 83%
$ 93,120,450 41% 32% 74%
$ 109,145,546 10% 45% 54%
$ 2,671,200 0% 0% 0%
$ 1,644,422 0% 0% 0%
$ 4,882,000 0% 0% 0%
$ 16,008,550 0% 0% 0%
$ 320,301 0% 0% 0%
$ 808,520 0% 0% 0%
ESTADO DE PAGO
Retenciones 5%
TOTAL NETO
IVA 19%
GASTOS GENERALES 10%
UTILIDADES 15%
TOTAL A PAGO

AGO A LOS 150 DÍAS (113 a 140)


P. TOTAL avance acumulado anterior avance actual parcial avance acumulado

$ 22,795,205 73% 18% 91%


$ 377,210 100% 0% 100%
$ 1,500,000 50% 33% 83%
0%
$ 36,649,197 100% 0% 100%
$ 6,114,942 101% 0% 101%
$ 27,585,090 100% 0% 100%
$ 19,926,387 100% 0% 100%
$ 63,336,000 83% 17% 100%
$ 93,120,450 74% 26% 100%
$ 109,145,546 54% 45% 99%
$ 2,671,200 0% 42% 42%
$ 1,644,422 0% 10% 10%
$ 4,882,000 0% 0% 0%
$ 16,008,550 0% 0% 0%
$ 320,301 0% 0% 0%
$ 808,520 0% 0% 0%
ESTADO DE PAGO
Retenciones 5%
TOTAL NETO
IVA 19%
GASTOS GENERALES 10%
UTILIDADES 15%
TOTAL A PAGO

AGO A LOS 180 DÍAS (141 a 154)


P. TOTAL avance acumulado anterior avance actual parcial avance acumulado

$ 22,795,205 91% 9% 100%


$ 377,210 100% 0% 100%
$ 1,500,000 83% 17% 100%
$ 36,649,197 100% 0% 100%
$ 6,114,942 101% 0% 101%
$ 27,585,090 100% 0% 100%
$ 19,926,387 100% 0% 100%
$ 63,336,000 100% 0% 100%
$ 93,120,450 100% 0% 100%
$ 109,145,546 99% 2% 100%
$ 2,671,200 42% 58% 100%
$ 1,644,422 10% 90% 100%
$ 4,882,000 0% 100% 100%
$ 16,008,550 0% 100% 100%
$ 320,301 0% 100% 100%
$ 808,520 0% 100% 100%
ESTADO DE PAGO
Retenciones 5%
TOTAL NETO
IVA 19%
GASTOS GENERALES 10%
UTILIDADES 15%
TOTAL A PAGO
$414,385,020
$406,616,570
$384,022,709
$365,941,138
$344,557,260
$317,305,381
02

113 a 119 120 a 126 127 a 133 134 a 140 141 a 147 148 a 154

$27,251,879
$25,751,879
79
$22,593,861
$21,383,879
$18,081,571

$7,768,450
$18,081,571

$7,768,450

a 120 a 127 a 134 a 141 a 148 a


126 133 140 147 154

estado de pago

$ 4,144,583
$ 377,210

$ 16,210,222
$ 1,259,385

$ 21,991,399
$ 1,099,570
$ 20,891,829
$ 3,969,448
$ 2,089,183
$ 3,133,774
$ 30,084,234
estado de pago

$ 4,144,583
$ -
$ -
$ -
$ 19,734,183
$ 4,407,846
$ 21,877,830
$ 6,527,610
$ 11,648,000
$ 8,562,800
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ 76,902,851
$ 3,845,143
$ 73,057,709
$ 13,880,965
$ 7,305,771
$ 10,958,656
$ 105,203,101

estado de pago

$ 4,144,583
$ -
$ 250,000
$ -
$ 704,792
$ 472,269
$ 5,707,260
$ 9,619,635
$ 20,384,000
$ 29,969,800
$ 10,422,386
$ -
$ -
$ -
$ -
$ -
$ -
$ 81,674,726
$ 4,083,736
$ 77,590,989
$ 14,742,288
$ 7,759,099
$ 11,638,648
$ 111,731,025

estado de pago

$ 4,144,583
$ -
$ 250,000
$ -
$ -
$ -
$ -
$ 3,779,142
$ 20,384,000
$ 29,969,800
$ 48,637,803
$ -
$ -
$ -
$ -
$ -
$ -
$ 107,165,328
$ 5,358,266
$ 101,807,062
$ 19,343,342
$ 10,180,706
$ 15,271,059
$ 146,602,169

estado de pago

$ 4,144,583
$ -
$ 500,000
$ -
$ -
$ -
$ -
$ -
$ 10,920,000
$ 24,618,050
$ 48,637,803
$ 1,113,000
$ 162,412
$ -
$ -
$ -
$ -
$ 90,095,848
$ 4,504,792
$ 85,591,055
$ 16,262,301
$ 8,559,106
$ 12,838,658
$ 123,251,120

estado de pago

$ 2,072,291
$ -
$ 250,000
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ 1,737,064
$ 1,558,200
$ 1,479,979
$ 4,882,000
$ 16,008,550
$ 320,301
$ 808,520
$ 29,116,906
$ 1,455,845
$ 27,661,061
$ 5,255,602
$ 2,766,106
$ 4,149,159
$ 39,831,928
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
DURACIÓN
PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO 6.00
ALBORADA
COMUNA : RINCONADA X
PARTIDA : INSTALACION DE FAENAITEM : A.1
UNIDAD : GL FECHA : 11-05-2017
TOTAL : 1
ESPECIFICACION MATERIALUNIDAD CANT. P. U. ($) TOTAL ($)
BOTIQUIN uni 1,0000 30.000 30,000 ESPECIFICACION MATERIAL
ARRIENDO DUCHAS mes 6.00 85.000 510 NETO
ARRIENDO VIVIENDA mes 6.00 300.000 1,800 GASTOS GE
ARRIENDO BODEGA mes 6.00 450.000 2,700,000 UTILIDADE
LETRERO DE OBRA uni 1,0000 350.000 #VALUE! TOTAL
CONSUMO AGUA POTA mes 6.00 100.000 600,000
CONSUMO ELECTRICID mes 6.00 100.000 600
BAÑOS QUIMICOS mes 6.00 90.000 540
DERECHOS DE INSPECC gl 1.00 9,674,445 9,674,445

A) TOTAL MATERIALES $ 16,804,445

MANO DE OBRA UNIDAD RENDIM. VALOR TOTAL ($) ESPECIFICACION MANO DE OBRA
JORNAL DE PATIO mes 6.00 374,000 2,244,000 NETO
NOCHERO mes 6.00 400.000 2,400,000 GASTOS GE
LEYES SOCIALES (O.C.) % 30.00 1,346,760 UTILIDADE
TOTAL
---
B) TOTAL MANO DE OBRA $ 5,990,760

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)


ESPECIFICACION MAQUINARIA
0 NETO
0 GASTOS GE
0 UTILIDADE
C) TOTAL MAQUINARIA $ 0 TOTAL

TOTAL COSTO (A + B + C) $ 22,795,205


GASTOS GENERALES 23.28 % 5,306,724
UTILIDADES 8 % 1,823,616
SUB TOTAL GENERAL $ 29,925,545
IVA 19 % 5,685,854
TOTAL $ 35,611,399
DURACIÓN
DIA 1 GL
DIA? 1

6 Meses

ECIFICACION MATERIAL
16,804,445
3912075
1344355.6
22,060,875

FICACION MANO DE OBRA


5,990,760
1394648.93
479260.8
7,864,670

CIFICACION MAQUINARIA
0
0
0
0
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
DURACIÓN
PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO 0.10
ALBORADA
COMUNA : RINCONADA x
PARTIDA : SEÑALIZACION PROVIS ITEM : A.2
UNIDAD : GL FECHA : 11 MAYO 2017
TOTAL : 1
ESPECIFICACION MATERIALUNIDAD CANT. P. U. ($) TOTAL ($)
LETREROS DE SEÑALI uni 50.00 7.500 375,000
ESPECIFICACION MATERIAL
NETO
GASTOS GE
UTILIDADE
TOTAL
A) TOTAL MATERIALES $ 375,000

MANO DE OBRA UNIDAD RENDIM. VALOR TOTAL ($) ESPECIFICACION MANO DE OBRA
JORNAL Dia 0.10 17,000 1,700 NETO
LEYES SOCIALES % 30.00 510 GASTOS GE
UTILIDADE
--- TOTAL
B) TOTAL MANO DE OBRA $ 2,210

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($) ESPECIFICACION MAQUINARIA


NETO
0 GASTOS GE
0 UTILIDADE
0 TOTAL
C) TOTAL MAQUINARIA $ 0

TOTAL COSTO (A + B + C) $ 377,210


GASTOS GENERALES 23.28 % 87,814
UTILIDADES 8 % 30,177
SUB TOTAL GENERAL $ 495,201
IVA 19 % 94,088
TOTAL $ 589,290 74850
DURACIÓN
dia 5 Dia
dia?

5 Días Total

ECIFICACION MATERIAL
375,000
87300
30000
492,300

FICACION MANO DE OBRA


2,210
514.488
176.8
2,901

CIFICACION MAQUINARIA
0
0
0
0
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO
ALBORADA
COMUNA : RINCONADA
PARTIDA : LABORATORIO CONTROL TECNICO ITEM : A.3
UNIDAD : GL FECHA : 11-05-2017

ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($)


ENSAYOS DE LABORATORIO gl 5,0000 1500000

A) TOTAL MATERIALES $

MANO DE OBRA UNIDAD RENDIM. VALOR HD

LEYES SOCIALES % 0.00 ---


B) TOTAL MANO DE OBRA $

MAQUINARIA UNIDAD RENDIM. VALOR ($)

C) TOTAL MAQUINARIA $

TOTAL COSTO (A + B + C) $
GASTOS GENERALES 23.28 %
UTILIDADES 8 %
SUB TOTAL GENERAL $
IVA 19 %
TOTAL $
ARIOS
DURACIÓN
VALPARAISO 0.00 dia 1 gl
RINCONADA x dia? 1
A.3
11-05-2017 6 Días Total

TOTAL ($)
7,500,000
ESPECIFICACION MATERIAL
NETO 7,500,000
GASTOS GE 1746000
UTILIDADE 600000
TOTAL 9,846,000
7,500,000

TOTAL ($)
ESPECIFICACION MANO DE OBRA
NETO 0
GASTOS GE 0
UTILIDADE 0
0 TOTAL 0
0

TOTAL ($) ESPECIFICACION MAQUINARIA


NETO 0
0 GASTOS GE 0
0 UTILIDADE 0
0 TOTAL 0
0

7,500,000
1,746,000
600,000
9,846,000
1,870,740
11,716,740
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO
ALBORADA
COMUNA : RINCONADA
PARTIDA : EXCAVACION Y TRANSPORTE BOTADERO ITEM : B.1
UNIDAD : M3 FECHA : 11-05-2017
TOTAL : 6,221
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
CAL(34,4m3/Sac) sac 2.00 2.050 4,090
estaca PINO 2x2"(45m3/m3 uni 0.02 750 17

A) TOTAL MATERIALES $ 4,107

MANO DE OBRA UNIDAD RENDIM. VALOR TOTAL ($)


MAESTRO(128m3/dia) dia 0.0078 25,000 195
JORNAL dia 0,0078 17,000 133
LEYES SOCIALES (O.C.) % 30.00 98

LEYES SOCIALES % 56.00 ---


B) TOTAL MANO DE OBRA $ 426

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)


EXCAVADORA(20m3/dia) hor 0.01 14,000 117
RETIRO DE ESCOMBROS m3 0.14 9,200 1,242
0
0
C) TOTAL MAQUINARIA $ 1,359

TOTAL COSTO (A + B + C) $ 5,891


GASTOS GENERALES 23.28 % 1,371
UTILIDADES 8 % 471
SUB TOTAL GENERAL $ 7,734
IVA 19 % 1,469
TOTAL $ 9,203
DURACIÓN
0.01 dia 1 m3
x dia? 6221

52 Días Total

ESPECIFICACION MATERIAL
NETO 4,107
GASTOS GE 956
UTILIDADE 329 Bulldozer
TOTAL 5,391 bulldozer 0.04 hora
R.Excavador 0.05 hora

ESPECIFICACION MANO DE OBRA 0.09 hora


NETO 426 0.99 dia
GASTOS GE 99
UTILIDADE 34
TOTAL 559

ESPECIFICACION MAQUINARIA
NETO 1,359
GASTOS GE 316 0.05
UTILIDADE 109
TOTAL 1,784
m3
m3

m3
0.5
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO
PROYECTO : REGION : VALPARAISO
CALLE ALBORADA
COMUNA : RINCONADA
PARTIDA : RELLENOS COMPACTADOS ITEM : B.2
UNIDAD : M3 FECHA : 11-05-2017
TOTAL : 249
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
INTEGRAL DE RIO+flete m3 1.20 16500 19,800

A) TOTAL MATERIALES $ 19,800

MANO DE OBRA UNIDAD RENDIM. VALOR TOTAL ($)


JORNAL dia 0.20 15,000 3,000
LEYES SOCIALES (O.C.) % 30 900

---
B) TOTAL MANO DE OBRA $ 3,900

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)


RODILLO COMPACTAD dia 0.1560 5,500 858
0
0
0
C) TOTAL MAQUINARIA $ 858

TOTAL COSTO (A + B + C) $ 24,558


GASTOS GENERALES 23.28 % 5,717
UTILIDADES 8 % 1,965
SUB TOTAL GENERAL $ 32,240
IVA 19 % 6,126
TOTAL $ 38,365
DURACIÓN
0.16 dia 1 m3
x dia? 249

39 Días Total

ESPECIFICACION MATERIALES ESPECIFICACION MAQUINARIA


NETO 19,800 NETO 858
GASTOS GENERALES 4,609 GASTOS GENERAL 200
UTILIDADES 1,584 UTILIDADES 69
TOTAL 25,993 TOTAL 1,126

ESPECIFICACION MANO DE OBRA


NETO 3,900
GASTOS GENERALES 908
UTILIDADES 312
TOTAL 5,120
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO
ALBORADA
COMUNA : RINCONADA
PARTIDA : PREPARACION DE LA SUBRASANTE ITEM : B.3
UNIDAD : M2 FECHA : 11-05-2017
TOTAL : 8,700
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)

A) TOTAL MATERIALES $

MANO DE OBRA UNIDAD RENDIM. VALOR TOTAL ($)

JORNAL dia 0.090 17,000 1,530


LEYES SOCIALES (O.C.) % 30.00 444

---
B) TOTAL MANO DE OBRA $ 1,974

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)

CAMION ALJIBE hr 0.16 7,350 1,176


RODILLO COMPACTADOR(300m2/dia) dia 0.003 6,300 21

C) TOTAL MAQUINARIA $ 1,197

TOTAL COSTO (A + B + C) $ 3,171


GASTOS GENERALES 23.28 % 738
UTILIDADES 8 % 254
SUB TOTAL GENERAL $ 4,162
IVA 19 % 791
TOTAL $ 4,953
DURACIÓN
0.0033 dia 1 m2
x dia? 8700

29 Días Total

ESPECIFICACION MATERIALES ESPECIFICACION MAQUINARIA


NETO 0 NETO 1,197
GASTOS GENERALES 0 GASTOS GENERALES 279
UTILIDADES 0 UTILIDADES 96
TOTAL 0 TOTAL 1,571

ESPECIFICACION MAANO DE OBRA


NETO 1,974
GASTOS GENERALES 459
UTILIDADES 158
TOTAL 2,591
FORMATO DE ANALISIS DE PRECIOS UNITARIOS

PROYECTO : REGION : VALPARAISO


MEJORAMIENTO PAVIMENTO CALLE ALBORADA
COMUNA : RINCONADA
PARTIDA : SUMINISTRO Y COLOCACION SOLERAS TIPO A ITEM : B.4
UNIDAD : ML FECHA :
TOTAL : 2,320
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
SOLERA TIPO A uni 1,0500 3.580 3,759
ESTABILIZADO EN PLANTA m3 0,0390 6.000 #VALUE!
HORMIGON HS04004005 m3 0.04 50,424 2,017
ARENA m3 0,0150 14.000 #VALUE!
SIKACURE 116 (TAMBOR) tam 0,0004 300,000 #VALUE!

A) TOTAL MATERIALES $ 6,340

MANO DE OBRA UNIDAD RENDIM. VALOR HD TOTAL ($)


MAESTRO dia 0.03 25,000 625
JORNAL dia 0,0650 17,000 1,105
LEYES SOCIALES (O.C.) % 30.00 519

---
B) TOTAL MANO DE OBRA $ 2,249

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)

C) TOTAL MAQUINARIA $

TOTAL COSTO (A + B + C) $ 8,589


GASTOS GENERALES 23.28 % 2,000
UTILIDADES 8 % 687
SUB TOTAL GENERAL $ 11,276
IVA 19 % 2,142
TOTAL $ 13,418
23.28
DURACIÓN
0.03 dia 1 ml
x dia? 2320

58 Días Total

ESPECIFICACION MATERIALES ESPECIFICACION MAQUINARIA


NETO 6,340 NETO 0
GASTOS GENERALES 1,476 GASTOS GENERALES 0
UTILIDADES 507 UTILIDADES 0
TOTAL 8,323 TOTAL 0

ESPECIFICACION MANO DE OBRA


NETO 2,249
GASTOS GENERALES 524
UTILIDADES 180
TOTAL 2,952
FORMATO DE ANALISIS DE PRECIOS UNITARIOS

PROYECTO : REGION : VALPARAISO


MEJORAMIENTO PAVIMENTO CALLE ALBORADA
COMUNA : RINCONADA
PARTIDA : SUBBASE GRANULAR CBR>60 E=15cm ITEM : B.5
UNIDAD : M2 FECHA :
TOTAL : 8,700
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
estabilizado chancado +Flete m3 1.20 4500 5,400

A) TOTAL MATERIALES $ 5,400

MANO DE OBRA UNIDAD RENDIM. VALOR HD TOTAL ($)

JORNAL dia 0.06 15,000 900


LEYES SOCIALES (O.C.) % 30.00 270

B) TOTAL MANO DE OBRA $ 1,170

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)


RODILLO COMPACTADOR 10 ton hor 0.010 25,000 250
MOTONIVELADORA hor 0.016 25,000 400
CAMION ALJIBE hor 0,0080 7,500 #VALUE!

C) TOTAL MAQUINARIA $ 710

TOTAL COSTO (A + B + C) $ 7,280


GASTOS GENERALES 23.28 % 1,695
UTILIDADES 8 % 582
SUB TOTAL GENERAL $ 9,557
IVA 19 % 1,816
TOTAL $ 6,995
DURACIÓN
0.01 dia 1 m2
x dia? 8700

87 Días Total

ESPECIFICACION MATERIALES ESPECIFICACION MAQUINARIA


NETO 5,400 NETO 710
GASTOS GENERALES 1,257 GASTOS GENERALES 165
UTILIDADES 432 UTILIDADES 57
TOTAL 7,089 TOTAL 932

ESPECIFICACION MANO DE OBRA


NETO 1,170
GASTOS GENERALES 272
UTILIDADES 94
TOTAL 1,536
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO
ALBORADA
COMUNA : RINCONADA
PARTIDA : BASE GRANULAR CBR>60 E=30cm ITEM : B.6
UNIDAD : M2 FECHA :
TOTAL : 8,700
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
Estabilizadp + Flete m3 1.30 6.000 7,800

A) TOTAL MATERIALES $ 7,800

MANO DE OBRA UNIDAD RENDIM. VALOR HD TOTAL ($)


MAESTRO dia 0,0340 25,000 850
JORNAL dia 0,0340 15,000 510
LEYES SOCIALES (O.C.) % 30.00 408

---
B) TOTAL MANO DE OBRA $ 1,768

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)


RODILLO COMPACTADOR dia 0.01 6,300 63
MOTONIVELADORA hor 0.033 25,000 825
CAMION ALJIBE hor 0.03 7,500 248

C) TOTAL MAQUINARIA $ 1,136

TOTAL COSTO (A + B + C) $ 10,704


GASTOS GENERALES 23.28 % 2,492
UTILIDADES 8 % 856
SUB TOTAL GENERAL $ 14,052
IVA 19 % 2,670
TOTAL $ 16,721
DURACIÓN
0.01 dia 1 m2
x dia? 8700

87 Días Total

ESPECIFICACION MATERIALES ESPECIFICACION MAQUINARIA


NETO 7,800 NETO 1,136
GASTOS GENERALES 1,816 GASTOS GENERALE 264
UTILIDADES 624 UTILIDADES 91
TOTAL 10,240 TOTAL 1,491

ESPECIFICACION MANO DE OBRA


NETO 1,768
GASTOS GENERALES 412
UTILIDADES 141
TOTAL 2,321
FORMATO DE ANALISIS DE PRECIOS UNITARIOS

PROYECTO MEJORAMIENTO
: PAVIMENTO CALLE
REGION : VALPARAISO
ALBORADA
COMUNA : RINCONADA m3
PARTIDA : PAVIMENTO HCV E=18cm ITEM : B.7 418.9
UNIDAD : M2 FECHA : 11-05-2017 7540.2
TOTAL : 7,540 m2
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
HORMIGON HF5.0(90)40-06--(5,3) m3 0.190 65,932 12,527
PERMANIT 3,5 MM pla 0.01 6.500 0
SIKACURE 116 (TAMBOR) tam 0,0016 320,000 #VALUE!
PINO BRUTO pul 0,0100 2.564 #VALUE!

A) TOTAL MATERIALES $ 13,130

MANO DE OBRA UNIDAD RENDIM. VALOR TOTAL ($)


Cuadrilla Hormigonera(80m2/dia) dia 0.01 100,000 833

LEYES SOCIALES (O.C.) % 30.00 250

---
B) TOTAL MANO DE OBRA $ 1,083

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)


VIBRADOR DE INMERSION(66,5m2/dia) dia 0.02 5,000 75
CERCHA VIBRADORA(400m2/sem) sem 0,0025 15.000 #VALUE!
PULVERIZADORA(110m2/dia) dia 0.01 10.000 0
MOLDES DE CALZADA 15x18(70m2/dia) mes 0.02 4,000 60
C) TOTAL MAQUINARIA $ 263

TOTAL COSTO (A + B + C) $ 14,476


GASTOS GENERALES 23.28 % 3,370
UTILIDADES 8 % 1,158
SUB TOTAL GENERAL $ 19,003
IVA 19 % 3,611
TOTAL $ 22,614
DURACIÓN
0.01 dia 1 m2
x dia? 7540

63 Días Total

m3 m2 R/Dia
ESPECIFICACION MATERIALES 0.190 1 0.01
NETO 13,130 15.2
GASTOS GENERAL 3,057
UTILIDADES 1,050
TOTAL 13,130
Camiones Necesarios 55.8533333
Load Camion Mixer 7.5
ESPECIFICACION MANO DE OBRA m2 x Camion 39.4736842
NETO 1,083 Rend. Cuadrilla x m2 0.01
GASTOS GENERAL 252 Rend. Cuadrilla x dia 120
UTILIDADES 87 Cap.Max -N°Camion x Dia 3.04
TOTAL 1,422

27,618,878

ESPECIFICACION MAQUINARIA
NETO 263
GASTOS GENERAL 61
UTILIDADES 21
TOTAL 345
https://portal.ondac.com/601/w3-article-117820.html

https://tienda.melon.cl/
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO
ALBORADA
COMUNA : RINCONADA
PARTIDA : OBRAS DE DEMARCACION ITEM : B.14
UNIDAD : M2 FECHA :
TOTAL : 81
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
PINTURA TERMOPLASTICA galon 0.42 25,000 10,462

A) TOTAL MATERIALES $ 10,462

MANO DE OBRA UNIDAD RENDIM. VALOR HD TOTAL ($)


MAESTRO dia 0.13 25,000 3,125
JORNAL dia 0.13 17,000 2,125
LEYES SOCIALES % 30.00 2,940

---
B) TOTAL MANO DE OBRA $ 8,190

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)


MAQUINA PINTA BANDA dia 0.10 16,500 1,650

C) TOTAL MAQUINARIA $ 1,650

TOTAL COSTO (A + B + C) $ 20,302


GASTOS GENERALES 23.28 % 4,726
UTILIDADES 8 % 1,624
SUB TOTAL GENERAL $ 26,652
IVA 19 % 5,064
TOTAL $ 31,716
DURACIÓN
0.13 dia 1 m2
x dia? 81

10.125 Días Total

ESPECIFICACION MATERIALES ESPECIFICACION MAQUINARIA


NETO 10,462 NETO 1,650
GASTOS GENERALES 2,435 GASTOS GENERALES 384
UTILIDADES 837 UTILIDADES 132
TOTAL 13,734 TOTAL 2,166

ESPECIFICACION MANO DE OBRA


NETO 8,190
GASTOS GENERALES 1,907
UTILIDADES 655
TOTAL 10,752
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO
PROYECTO : REGION : VALPARAISO
CALLE ALBORADA
COMUNA : RINCONADA
PARTIDA : SELLO DE JUNTAS ITEM : B.7.1
UNIDAD : GL FECHA :
TOTAL : 1
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
EMULSION ASFALTICA CSS-1H(5,4-9,1 kg tam 7,0000 110500 773,500
JAC-200 KG tam 20.00 80,000 1,600,000
GUANTES CABRITILLA uni 25,0000 1.300 #VALUE!

A) TOTAL MATERIALES $ 2,406,000

MANO DE OBRA UNIDAD RENDIM. VALOR HD TOTAL ($)


JORNAL DIA 12.00 17,000 204,000
LEYES SOCIALES (O.C.) % 30.00 61,200

B) TOTAL MANO DE OBRA $ 265,200

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)

C) TOTAL MAQUINARIA $

TOTAL COSTO (A + B + C) $ 2,671,200


GASTOS GENERALES 23.28 % 621,855
UTILIDADES 8 % 213,696
SUB TOTAL GENERAL $ 3,506,751
IVA 19 % 666,283
TOTAL $ 4,173,034
DURACIÓN
12.00 DIA 1 gl
x DIA? 1

12 DIA Total

Tambor
Kgs x M2
m2 x tambor
M2 totales
Tambores

ESPECIFICACION MANO DE OBRA ESPECIFICACION MATERIALES


NETO 265,200 NETO 2,406,000
GASTOS GENERALES 61,739 GASTOS GENERALES 560,117
UTILIDADES 21,216 UTILIDADES 192,480
TOTAL 348,155 TOTAL 3,158,597

ESPECIFICACION MAQUINARIA
NETO 0
GASTOS GENERALES 0
UTILIDADES 0
TOTAL 0
https://www.mercadopublico.cl/PurchaseOrder/Modules/PO/DetailsPurchaseOrder.aspx

200
7
29
200
7
es/PO/DetailsPurchaseOrder.aspx?qs=GIAK7rqCecupsq7/+RHbqw==
FORMATO DE ANALISIS DE PRECIOS UNITARIOS

PROYECTO : MEJORAMIENTO PAVIMENTO CALLE REGION : VALPARAISO


ALBORADA
COMUNA : RINCONADA
PARTIDA : SEÑALETICA TRANSITO ITEM : B.15
UNIDAD : UN FECHA :
CANTIDAD 10
DURACIÓN 3
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($)
POSTE OMEGA uni 10.00 12000
SEÑALETICA uni 10.00 29,528
HORMIGON HN30802005 m3 0.96 57,000

A) TOTAL MATERIALES $

MANO DE OBRA UNIDAD RENDIM. VALOR HD


JORNAL dia 0.33 17,000
MAESTRO dia 0.33 25,000
LEYES SOCIALES (O.C.) % 30%

B) TOTAL MANO DE OBRA $

MAQUINARIA UNIDAD RENDIM. VALOR ($)

C) TOTAL MAQUINARIA $

TOTAL COSTO (A + B + C) $
GASTOS GENERALES 23.28 %
UTILIDADES 8 %
SUB TOTAL GENERAL $
IVA 19 %
TOTAL $
RIOS

VALPARAISO
RINCONADA
B.15

TOTAL ($) ESPECIFICACION MATERIAL MAQUINARIA


120,000 NETO 470,000 NETO 0
295,280 G.G 47000.0 G.G 0.0
54,720 UTILIDADES 70500.0 UTILIDADE 0.0
TOTAL NETO 587,500.0 TOTAL NET 0.0

470,000 MANO DE OBRA


NETO 18,200
TOTAL ($) G.G 1820.0
5,667 UTILIDADES 2730.0
8,333 TOTAL NETO 22,750.0
4,200

18,200

TOTAL ($)

488,200
113,653
39,056
640,909
121,773
762,682
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
PROYECTO : REGION :
MEJORAMIENTO PAVIMENTO CALLE ALBORADA
COMUNA :
PARTIDA : MODIFICACION DE LETREROS ITEM :
UNIDAD : GL FECHA :
Cantidad 20
Duracion 10.00
ESPECIFICACION MATERIAL UNIDAD CANT.
DISCO CORTE 7" uni 10,0000
GUANTES CABRITILLA uni 6,0000
HORMIGON HS04004005 m3 5,0000
ESMALTE SINTETICO gal 3,0000
POSTE 50X50 uni 5,0000

A) TOTAL MATERIALES

MANO DE OBRA UNIDAD RENDIM.


JORNAL dia 0.50
SOLDADOR dia 5,0000
LEYES SOCIALES % 30%

LEYES SOCIALES %
B) TOTAL MANO DE OBRA

MAQUINARIA UNIDAD RENDIM.


RETIRO DE ESCOMBROS m3 5,0000
RETROEXCAVADORA hor 6,0000
VIBRADOR DE INMERSION dia 5,0000

C) TOTAL MAQUINARIA

TOTAL COSTO (A + B + C)
GASTOS GENERALES 23.28
UTILIDADES 8
SUB TOTAL GENERAL
IVA 19
TOTAL
NITARIOS
VALPARAISO
RINCONADA
D.1

P. U. ($) TOTAL ($)


1.600 16,000
1.300 #VALUE!
47.500 #VALUE!
25.000 #VALUE!
15.000 #VALUE!

$ 387,500

VALOR HD TOTAL ($)


13,334 133,340
16.667 83,335
65,003

---
$ 281,678

VALOR ($) TOTAL ($)


3.750 18,750
15.000 #VALUE!
4.500 #VALUE!

$ 131,250

$ 800,428
% 186,340
% 64,034
$ 1,050,801
% 199,652
$ 1,250,453
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO
ALBORADA
COMUNA : RINCONADA
PARTIDA : SEÑALETICA VERTICAL PARADERO ITEM : B.15
UNIDAD : UN FECHA :
CANTIDAD 2
DURACIÓN 1.0
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($) TOTAL ($)
POSTE OMEGA uni 2.00 25.000 50,000
SEÑALETICA uni 2.00 39,528 79,056
HORMIGON HN30802005 m3 0.19 57,000 10,944

A) TOTAL MATERIALES $ 140,000

MANO DE OBRA UNIDAD RENDIM. VALOR HD TOTAL ($)


JORNAL dia 0.50 13.334 6,667
MAESTRO dia 0.50 17.667 8,834
LEYES SOCIALES (O.C.) % 30% 4,650

---
B) TOTAL MANO DE OBRA $ 20,151

MAQUINARIA UNIDAD RENDIM. VALOR ($) TOTAL ($)

C) TOTAL MAQUINARIA $

TOTAL COSTO (A + B + C) $ 160,151


GASTOS GENERALES 23.28 % 37,283
UTILIDADES 8 % 12,812
SUB TOTAL GENERAL $ 210,246
IVA 19 % 39,947
TOTAL $ 250,192
ESPECIFICACION MATERIAL
NETO 140,000
G.G 14000.0
UTILIDADE 21000.0
TOTAL NETO 175,000.0

MANO DE OBRA
NETO 20,151
G.G 2015.1
UTILIDADE 3022.6
TOTAL NET 25,188.3

MAQUINARIA
NETO 0
G.G 0.0
UTILIDADE 0.0
TOTAL NET 0.0
FORMATO DE ANALISIS DE PRECIOS UNITARIOS
MEJORAMIENTO PAVIMENTO CALLE
PROYECTO : REGION : VALPARAISO
ALBORADA
COMUNA : RINCONADA
PARTIDA : SEÑALETICA LIMITE DE VELOCIDAD ITEM : B.15
UNIDAD : UN FECHA :
CANTIDAD 4
DURACIÓN 1
ESPECIFICACION MATERIAL UNIDAD CANT. P. U. ($)
POSTE OMEGA uni 4.00 15000
SEÑALETICA uni 4.00 29,528
HORMIGON HN30802005 m3 0.38 27,000

A) TOTAL MATERIALES $

MANO DE OBRA UNIDAD RENDIM. VALOR HD


JORNAL dia 0.25 17,000
MAESTRO dia 0.25 25,000
LEYES SOCIALES (O.C.) % 30%

---
B) TOTAL MANO DE OBRA $

MAQUINARIA UNIDAD RENDIM. VALOR ($)

C) TOTAL MAQUINARIA $

TOTAL COSTO (A + B + C) $
GASTOS GENERALES 23.28 %
UTILIDADES 8 %
SUB TOTAL GENERAL $
IVA 19 %
TOTAL $
ARIOS

VALPARAISO
RINCONADA
B.15

TOTAL ($) ESPECIFICACION MATERIAL


60,000 NETO 188,480
118,112 G.G 18848.0
10,368 UTILIDADES 28272.0
TOTAL NETO 235,600.0

188,480 MANO DE OBRA


NETO 13,650
TOTAL ($) G.G 1365.0
4,250 UTILIDADES 2047.5
6,250 TOTAL NETO 17,062.5
3,150

13,650 MAQUINARIA
NETO 0
TOTAL ($) G.G 0.0
UTILIDADES 0.0
TOTAL NETO 0.0

202,130
47,056
16,170
265,356
50,418
315,774

También podría gustarte