Documentos de Académico
Documentos de Profesional
Documentos de Cultura
S/ 333.94 S/ 4,007.28
S/ 42.00 S/ 2,520.00
S/ 4.94 S/ 3,952.00
S/ 305.15 S/ 2,441.20
S/ 46.53 S/ 1,861.20
S/ 4.94 S/ 2,470.00
S/ 279.22 S/ 2,512.98
S/ 33.07 S/ 3,968.40
S/ 4.94 S/ 3,458.00
S/ 2.67 S/ 2,723.40 S/ 29,914.46
S/ 48.84 S/ 1,465.20
S/ 76.09 S/ 3,652.32 S/ 5,117.52
S/ 35,031.98
S/ 5,254.80
S/ 3,503.20
S/ 43,789.98
S/ 7,882.20
51,672.17
FORMULA POLINOMICA
OBRA AMPLIACION DE OFICINAS
CONTRATISTA
ESPECIALIDA TFO
R=V(K-1)
R= - 21.89
A POLINOMICA
P.B= 43789.98
FECHA= DS #011-79-VC
AREA GEOGRAFICA 03
Obra : CHOSA
Contratista : LOS TERRIBLES DE LA CONSTRUCCION
Supervisor : VIGILNTE DE CACHINA
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
SALDO BRUTO POR VALORIZAR SIN IGV.
% ADELANTO MAXIMO PERMISIBLE>>>>>>>>>>>>> 20.00%
ADELANTO DE MATERIALES SOLICITADO>>>>>>>>> 20.00%
21 CEMENTO PORLANT T I
5 PIEDRA CHANCADA
17 LADRILLO DE ARCILLA
4 ARENA GRUESA
43 MADERA NACIONAL P/ENCOFRADO
3 ACERO CORRUGADO
Nota: el monto solicitado por el contratista CUMPLE con el porcentaje maximo por for,ula polinomica
pues solicita la suma de s/.8,758.00
ONTRATISTA
Supervision
MONTO S/.
S/ 29,914.46
S/ 5,117.52
S/ 35,031.98
S/ 5,254.80
S/ 3,503.20
S/ 43,789.98
S/ 43,789.98
> 20.00% S/ 8,758.00
20.00%
Imo = mes que elavoraron el proye
Ima = mes del adelanto de material
Monto Maximo = Coef. Inc. X Porc. Inc. X Saldo Bruto por Valorizar X Ima/Imo
Coef. De Porcentaje de Saldo Bruto Por Indices Unificados Supervision Monto
Incidencia Incidencia valorizar
Imo () Ima () Maximo
0.133 0.729 459.4 460.02 S/ 4,253.22
0.133 0.173 251.25 453.21 S/ 1,816.41
0.109 0.119 603.05 604.55 S/ 570.85
S/ 43,789.98
0.109 0.881 553.18 555.21 S/ 4,219.10
0.103 0.893 708.34 705.22 S/ 4,010.92
0.17 1.000 453.51 456.59 S/ 7,494.85
S/ 22,365.36
>>>>>>>>>>>>>>
zar X Ima/Imo
Contratista
Solicitado
S/ 1,665.51
S/ 711.28
S/ 223.54
S/ 1,652.15
S/ 1,570.62
S/ 2,934.89
S/ 8,758.00