1 PRELIMINARES
1,1 CAMPAMENTO 18 M2 UN 2.102.295 2.106.933 2.096.995 2.108.920 2.102.958 2.104.282 2.106.270 2.104.945 2.094.345
1,2 CAMPAMENTO 9 M2 UN 1.233.437 1.235.755 1.230.786 1.236.749 1.233.768 1.234.430 1.235.424 1.234.762 1.229.462
1,3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 15.338 15.338 15.338 15.338 15.338 15.338 15.338 15.338 15.338
1,4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 17.188 17.188 17.188 17.188 17.188 17.188 17.188 17.188 17.188
1,5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 19.908 19.908 19.908 19.908 19.908 19.908 19.908 19.908 19.908
1,6 CERCA EN TABLA H=2.30 M ML 69.391 69.391 69.391 69.391 69.391 69.391 69.391 69.391 69.391
1,7 CERCA EN TEJA DE ZINC H=1.80 M ML 48.544 48.594 48.486 48.616 48.551 48.565 48.587 48.573 48.457
1,8 CERCA EN TELA VERDE H = 2.10 M ML 22.526 22.577 22.468 22.598 22.533 22.548 22.570 22.555 22.439
1,9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 89.652 89.652 89.652 89.652 89.652 89.652 89.652 89.652 89.652
1,10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 7.015 7.015 7.015 7.015 7.015 7.015 7.015 7.015 7.015
1,11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 9.939 9.939 9.939 9.939 9.939 9.939 9.939 9.939 9.939
1,12 DEMOLICIÓN ENCHAPE MURO M2 7.614 7.614 7.614 7.614 7.614 7.614 7.614 7.614 7.614
1,13 DEMOLICIÓN PAÑETE MURO M2 8.255 8.255 8.255 8.255 8.255 8.255 8.255 8.255 8.255
1,14 DEMOLICIÓN CIELO RASO FALSO M2 9.970 9.970 9.970 9.970 9.970 9.970 9.970 9.970 9.970
1,15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 9.968 9.968 9.968 9.968 9.968 9.968 9.968 9.968 9.968
1,16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 14.927 14.927 14.927 14.927 14.927 14.927 14.927 14.927 14.927
1,17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 20.354 20.354 20.354 20.354 20.354 20.354 20.354 20.354 20.354
1,18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 30.325 30.325 30.325 30.325 30.325 30.325 30.325 30.325 30.325
1,19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 44.152 44.152 44.152 44.152 44.152 44.152 44.152 44.152 44.152
1,20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 54.656 54.656 54.656 54.656 54.656 54.656 54.656 54.656 54.656
1,21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 45.611 45.611 45.611 45.611 45.611 45.611 45.611 45.611 45.611
1,22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 64.065 64.065 64.065 64.065 64.065 64.065 64.065 64.065 64.065
1,23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 75.854 75.854 75.854 75.854 75.854 75.854 75.854 75.854 75.854
1,24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 92.967 92.967 92.967 92.967 92.967 92.967 92.967 92.967 92.967
1,25 DEMOLICIÓN PLACA PISO 0.05 M M2 10.144 10.144 10.144 10.144 10.144 10.144 10.144 10.144 10.144
1,26 DEMOLICIÓN PLACA PISO 0.10 M M2 16.388 16.388 16.388 16.388 16.388 16.388 16.388 16.388 16.388
1,27 DEMOLICIÓN PLACA PISO 0.15 M M2 24.955 24.955 24.955 24.955 24.955 24.955 24.955 24.955 24.955
1,28 DEMOLICIÓN PLACA PISO 0.20 M M2 40.949 40.949 40.949 40.949 40.949 40.949 40.949 40.949 40.949
1,29 DEMOLICIÓN VIGAS Y COLUMNAS M3 256.784 256.784 256.784 256.784 256.784 256.784 256.784 256.784 256.784
1,30 DESCAPOTE A MAQUINA E=0.20 M M2 1.626 1.626 1.626 1.626 1.626 1.626 1.626 1.626 1.626
1,31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 6.474 6.474 6.474 6.474 6.474 6.474 6.474 6.474 6.474
1,32 DESMONTE APARATOS SANITARIOS UN 23.144 23.144 23.144 23.144 23.144 23.144 23.144 23.144 23.144
1,33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 12.640 12.640 12.640 12.640 12.640 12.640 12.640 12.640 12.640
1,34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 12.502 12.502 12.502 12.502 12.502 12.502 12.502 12.502 12.502
1,35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 11.572 11.572 11.572 11.572 11.572 11.572 11.572 11.572 11.572
1,36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 10.811 10.811 10.811 10.811 10.811 10.811 10.811 10.811 10.811
1,37 DESMONTE MUROS SECOS M2 17.208 17.208 17.208 17.208 17.208 17.208 17.208 17.208 17.208
1,38 DESMONTE MARCOS Y PUERTAS UN 14.776 14.776 14.776 14.776 14.776 14.776 14.776 14.776 14.776
1,39 DESMONTE VENTANAS M2 12.640 12.640 12.640 12.640 12.640 12.640 12.640 12.640 12.640
1,40 LETRINA DE 2.0x1.0 UN 946.920 947.626 946.341 947.644 947.192 947.635 946.857 947.210 946.051
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1,41 M2 10.832 10.832 10.832 10.832 10.832 10.832 10.832 10.832 10.832
PRESICIÓN
1,42 REPLANTEO MANUAL DE CIMIENTOS M2 3.970 3.970 3.970 3.970 3.970 3.970 3.970 3.970 3.970
1,43 RED ELÉCTRICA PROVISIONAL L=50M UN 2.823.298 2.823.298 2.823.298 2.823.298 2.823.298 2.823.298 2.823.298 2.823.298 2.823.298
1,44 RED TELEFÓNICA PROVISIONAL UN 263.229 263.229 263.229 263.229 263.229 263.229 263.229 263.229 263.229
1,45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 9.709 9.709 9.709 9.709 9.709 9.709 9.709 9.709 9.709
2 CIMIENTOS
2,1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 75.666 81.818 78.196 78.196 81.818 87.250 69.141 72.763 78.196
2,2 BASE ARENA CEMENTO 1:20 M3 153.356 155.971 150.368 157.092 153.730 154.477 155.597 154.850 148.874
2,3 DEMOLICIÓN CABEZAS DE PILOTES M3 327.256 327.256 327.256 327.256 327.256 327.256 327.256 327.256 327.256
2,4 DEMOLICIÓN CIMIENTO ENTERRADO M3 227.512 227.512 227.512 227.512 227.512 227.512 227.512 227.512 227.512
2,5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 23.415 23.415 23.415 23.415 23.415 23.415 23.415 23.415 23.415
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
2,6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 CONSTRUCCIÓN
652.683 657.650 647.008 659.778 653.393 654.811 656.940 655.521 644.171
2,7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 655.046 660.206 649.149 662.417 655.784 657.257 659.468 657.994 646.202
2,8 ZAPATAS EN CONCRETO 3500 PSI M3 611.038 615.869 605.516 617.940 611.729 613.108 615.178 613.798 602.756
2,9 PILOTE DE MADERA D=20 CM ML 52.502 52.502 52.502 52.502 52.502 52.502 52.502 52.502 52.502
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,10 ML 162.298 162.298 162.298 162.298 162.298 162.298 162.298 162.298 162.298
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,11 ML 201.813 201.813 201.813 201.813 201.813 201.813 201.813 201.813 201.813
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,12 ML 249.599 249.599 249.599 249.599 249.599 249.599 249.599 249.599 249.599
DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2,13 ML 313.926 313.926 313.926 313.926 313.926 313.926 313.926 313.926 313.926
DISTANCIA MENOR DE 5 KM)
2,14 PILOTE HINCADO 25X25 ML 108.872 109.225 108.469 109.377 108.923 109.024 109.175 109.074 108.267
2,15 PILOTE HINCADO 30X30 ML 133.682 134.194 133.098 134.413 133.756 133.902 134.121 133.975 132.806
2,16 DADOS EN CONCRETO 3500PSI M3 595.140 599.971 589.618 602.042 595.831 597.210 599.280 597.900 586.858
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2,17 ML 97.327 97.327 97.327 97.327 97.327 97.327 97.327 97.327 97.327
MENOR DE 5 KM)
3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS
3,1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 40.649 40.665 40.630 40.672 40.651 40.656 40.663 40.658 40.621
3,2 SIFÓN EN PVC 6" UN 207.515 207.532 207.497 207.539 207.518 207.522 207.529 207.525 207.488
3,3 CAJA DE INSPECCIÓN DE 100X100 UN 464.382 467.645 462.540 466.684 466.264 469.202 461.634 465.303 461.619
3,4 CAJA DE INSPECCIÓN DE 40X40 UN 237.692 238.387 237.057 238.486 237.911 238.279 237.820 238.010 236.740
3,5 CAJA DE INSPECCIÓN DE 60X60 UN 267.539 268.629 266.542 268.784 267.882 268.460 267.739 268.037 266.044
3,6 CAJA DE INSPECCIÓN DE 80X80 UN 347.182 348.878 345.495 349.291 347.612 348.362 347.901 348.026 344.651
3,7 DUCTO ELÉCTRICO PVC 4" ML 115.070 115.090 115.070 115.070 115.090 115.120 115.021 115.070 115.070
3,8 POZO SÉPTICO ETERNIT 1000 LT UN 1.343.424 1.343.623 1.343.424 1.343.424 1.343.623 1.343.921 1.342.926 1.343.424 1.343.424
3,9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 119.731 119.911 119.526 119.988 119.757 119.808 119.885 119.834 119.424
3,10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 75.253 75.347 75.144 75.388 75.266 75.293 75.334 75.307 75.090
3,11 TUBERÍA DRENAJE PVC 110 ML 29.466 29.560 29.358 29.600 29.479 29.506 29.546 29.519 29.304
3,12 TUBERÍA DRENAJE PVC 160 ML 47.268 47.363 47.161 47.403 47.282 47.309 47.349 47.322 47.107
3,13 TUBERÍA DRENAJE PVC 200 ML 61.827 61.959 61.676 62.015 61.846 61.884 61.940 61.902 61.601
3,14 TUBERÍA DRENAJE PVC 250 ML 84.420 84.571 84.248 84.635 84.441 84.485 84.549 84.506 84.161
3,15 TUBERÍA DRENAJE PVC 315 ML 116.667 116.799 116.517 116.856 116.686 116.724 116.780 116.743 116.441
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3,16 UN 999.113 1.000.621 997.389 1.001.267 999.328 999.759 1.000.405 999.975 996.528
FILTRANTE)
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
3,17 UN 1.405.766 1.408.781 1.402.319 1.410.074 1.406.197 1.407.058 1.408.351 1.407.489 1.400.596
FILTRANTE)
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3,18 UN 1.820.828 1.826.858 1.813.933 1.829.444 1.821.688 1.823.412 1.825.997 1.824.274 1.810.487
FILTRANTE)
4 ESTRUCTURAS EN CONCRETO
4,1 CASETÓN DE LONA 0.8 X 0.35 M2 44.771 44.771 44.771 44.771 44.771 44.771 44.771 44.771 44.771
4,2 CASETÓN DE LONA 0.80X0.70 M2 58.846 58.846 58.846 58.846 58.846 58.846 58.846 58.846 58.846
4,3 COLUMNAS 3500 PSI M3 833.996 838.828 828.474 840.898 834.687 836.066 838.136 836.756 825.715
4,4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 242.085 248.578 236.814 247.421 244.625 244.271 242.696 244.303 234.178
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4,5 M2 101.122 101.591 100.586 101.792 101.189 101.323 101.524 101.390 100.318
REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4,6 M2 118.958 119.521 118.315 119.763 119.039 119.200 119.441 119.280 117.994
REFUERZO, CONCRETO DE 3500 PSI
4,7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 134.001 134.751 133.143 135.073 134.108 134.323 134.644 134.430 132.715
4,8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 141.314 142.112 140.403 142.453 141.428 141.656 141.998 141.770 139.947
4,9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 161.129 162.114 160.003 162.536 161.270 161.551 161.973 161.692 159.441
4,10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 178.892 180.018 177.606 180.500 179.053 179.375 179.857 179.535 176.963
4,11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 198.438 199.705 196.991 200.247 198.619 198.981 199.524 199.162 196.267
4,12 ENTREPISO VIGUETA PLACA M2 105.037 105.101 104.963 105.129 105.046 105.064 105.092 105.073 104.926
4,13 ESCALERA MACIZA 3500 PSI M3 991.535 996.367 986.013 998.437 992.226 993.605 995.675 994.295 983.254
4,14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 100.231 100.301 100.150 100.331 100.241 100.261 100.291 100.271 100.110
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
4,15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 CONSTRUCCIÓN
81.306 81.789 80.754 81.996 81.375 81.513 81.720 81.582 80.478
4,16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 91.060 91.652 90.385 91.905 91.145 91.314 91.567 91.398 90.047
4,17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 105.602 106.343 104.755 106.661 105.708 105.920 106.237 106.026 104.332
4,18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 727.436 732.268 721.914 734.338 728.127 729.506 731.577 730.197 719.155
4,19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 52.904 53.053 52.733 53.117 52.925 52.968 53.032 52.989 52.648
4,20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 285.476 287.634 283.010 288.558 285.784 286.400 287.325 286.709 281.777
4,21 ACERO FIGURADO 37000 PSI KG 4.415 4.415 4.415 4.415 4.415 4.415 4.415 4.415 4.415
4,22 ACERO FIGURADO 60000 PSI KG 4.631 4.631 4.631 4.631 4.631 4.631 4.631 4.631 4.631
4,23 REFUERZO MALLA ELECTROSOLDADA KG 6.621 6.621 6.621 6.621 6.621 6.621 6.621 6.621 6.621
4,24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 890.753 895.584 885.231 897.655 891.444 892.823 894.893 893.513 882.472
4,25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 801.646 806.934 795.603 809.199 802.402 803.912 806.177 804.667 792.583
4,26 VIGA AÉREA 3500 PSI M3 878.409 883.241 872.887 885.311 879.100 880.479 882.550 881.169 870.128
4,27 VIGA CINTA 3500 PSI M3 855.811 860.643 850.289 862.713 856.502 857.881 859.951 858.571 847.530
4,28 VIGA CANAL EN CONCRETO 3500 PSI M3 1.091.488 1.096.319 1.085.966 1.098.390 1.092.179 1.093.558 1.095.628 1.094.248 1.083.206
4,29 BASE EN CONCRETO POBRE 1500 PSI M3 304.547 309.854 298.481 312.129 305.306 306.821 309.096 307.580 295.449
5 MAMPOSTERÍA
5,1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 31.539 31.654 31.406 31.704 31.555 31.588 31.638 31.605 31.340
5,2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 54.340 54.455 54.207 54.505 54.356 54.389 54.439 54.406 54.141
5,3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 37.894 37.910 37.875 37.917 37.896 37.901 37.908 37.903 37.866
5,4 ARCOS EN LADRILLO PRENSADO ML 178.168 178.200 178.131 178.214 178.172 178.182 178.196 178.186 178.112
5,5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 47.106 47.255 46.935 47.319 47.127 47.170 47.234 47.191 46.850
5,6 DINTELES EN BLOQUE 0.15 M ML 29.085 29.156 29.005 29.186 29.095 29.115 29.146 29.125 28.965
5,7 ENCHAPES LADRILLO PRENSADO M2 103.953 104.018 103.879 104.046 103.963 103.981 104.009 103.991 103.842
5,8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 93.886 94.384 93.317 94.597 93.957 94.099 94.312 94.170 93.033
5,9 MURO DRYWALL DOBLE CARA 0.12 M M2 98.242 98.242 98.242 98.242 98.242 98.242 98.242 98.242 98.242
5,10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 58.024 58.024 58.024 58.024 58.024 58.024 58.024 58.024 58.024
5,11 MURO DRYWALL DOBLE CARA 0.10 M M2 94.719 94.719 94.719 94.719 94.719 94.719 94.719 94.719 94.719
5,12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 56.262 56.262 56.262 56.262 56.262 56.262 56.262 56.262 56.262
5,13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 109.099 109.099 109.099 109.099 109.099 109.099 109.099 109.099 109.099
5,14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 64.937 64.937 64.937 64.937 64.937 64.937 64.937 64.937 64.937
5,15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 121.058 121.058 121.058 121.058 121.058 121.058 121.058 121.058 121.058
5,16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 70.917 70.917 70.917 70.917 70.917 70.917 70.917 70.917 70.917
5,17 MURO EN BLOQUE Nº 5 E=0.12 M M2 43.141 43.173 43.103 43.187 43.145 43.155 43.169 43.159 43.085
5,18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 26.417 26.434 26.399 26.441 26.420 26.424 26.431 26.427 26.389
5,19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 56.143 56.165 56.118 56.174 56.146 56.152 56.162 56.155 56.106
5,20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 34.116 34.126 34.103 34.131 34.117 34.120 34.125 34.122 34.097
5,21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 63.246 63.268 63.221 63.277 63.249 63.255 63.264 63.258 63.208
5,22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 38.424 38.435 38.411 38.439 38.425 38.428 38.433 38.430 38.405
5,23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 103.684 103.793 103.560 103.839 103.699 103.731 103.777 103.746 103.497
5,24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 62.043 62.098 61.981 62.121 62.051 62.066 62.090 62.074 61.950
5,25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 39.774 39.795 39.749 39.805 39.777 39.783 39.792 39.786 39.736
5,26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 24.360 24.370 24.347 24.375 24.361 24.364 24.369 24.366 24.341
5,27 MURO EN BLOQUE Nº 5 E=0.23 M M2 78.756 78.799 78.706 78.818 78.762 78.774 78.793 78.781 78.681
5,28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 47.986 48.008 47.961 48.017 47.989 47.995 48.005 47.998 47.949
5,29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 93.168 93.239 93.088 93.269 93.179 93.199 93.229 93.209 93.048
5,30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 57.077 57.112 57.037 57.127 57.082 57.092 57.107 57.097 57.017
5,31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 190.199 190.351 190.025 190.417 190.221 190.264 190.330 190.286 189.938
5,32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 115.767 115.843 115.680 115.876 115.778 115.800 115.832 115.810 115.636
5,33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 94.049 94.116 93.971 94.145 94.058 94.078 94.107 94.087 93.933
5,34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 57.517 57.551 57.478 57.565 57.522 57.532 57.546 57.536 57.459
5,35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 49.285 49.334 49.230 49.355 49.292 49.306 49.327 49.313 49.202
5,36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 30.371 30.396 30.344 30.406 30.375 30.382 30.392 30.385 30.330
5,37 MURO TOLETE COMÚN 0.06 M M2 36.057 36.079 36.032 36.088 36.060 36.066 36.075 36.069 36.019
5,38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 22.192 22.203 22.180 22.208 22.194 22.197 22.201 22.198 22.174
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
5,39 MURO TOLETE COMÚN 0.12 M M2 CONSTRUCCIÓN
53.733 53.776 53.683 53.795 53.739 53.751 53.770 53.758 53.658
5,40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 33.362 33.384 33.337 33.393 33.365 33.371 33.380 33.374 33.324
5,41 MURO TOLETE COMÚN 0.25 M M2 103.765 103.830 103.690 103.858 103.774 103.793 103.821 103.802 103.653
5,42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 63.959 63.992 63.922 64.006 63.964 63.973 63.987 63.978 63.903
5,43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 75.945 75.988 75.895 76.007 75.951 75.963 75.982 75.970 75.870
5,44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 46.335 46.357 46.310 46.366 46.338 46.344 46.354 46.347 46.298
5,45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 157.979 158.131 157.804 158.196 158.000 158.044 158.109 158.066 157.717
5,46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 97.344 97.421 97.257 97.453 97.355 97.377 97.410 97.388 97.214
5,47 REMATES LADRILLO PRENSADO ML 33.961 33.978 33.943 33.985 33.964 33.968 33.975 33.971 33.934
5,48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 37.984 38.033 37.929 38.054 37.991 38.005 38.026 38.012 37.901
5,49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 64.632 64.697 64.557 64.724 64.641 64.659 64.687 64.669 64.520
5,50 LAVADA DE FACHADA M2 5.850 5.850 5.850 5.850 5.850 5.850 5.850 5.850 5.850
5,51 PASAMANOS EN CONCRETO 2500 PSI ML 54.735 54.851 54.602 54.900 54.751 54.784 54.834 54.801 54.536
5,52 DOVELA, GROUTING 3000 PSI ML 11.725 11.725 11.725 11.725 11.725 11.725 11.725 11.725 11.725
5,53 ANCLAJE 3/8" L=30CM UN 15.319 15.319 15.319 15.319 15.319 15.319 15.319 15.319 15.319
5,54 ANCLAJE 1/2" L=50CM UN 19.963 19.963 19.963 19.963 19.963 19.963 19.963 19.963 19.963
5,55 ANCLAJE 5/8" L=70CM UN 27.651 27.651 27.651 27.651 27.651 27.651 27.651 27.651 27.651
5,56 ANCLAJE 3/4" L=70CM UN 40.835 40.835 40.835 40.835 40.835 40.835 40.835 40.835 40.835
5,57 ANCLAJE 1" L= 70CM UN 5.089 5.125 5.047 5.140 5.094 5.104 5.119 5.109 5.027

6 PAÑETES, REVOQUES Y REPELLOS


6,1 ENTRAMADO MADERA CIELO RASO M2 17.886 17.886 17.886 17.886 17.886 17.886 17.886 17.886 17.886
6,2 FILOS O DILATACIONES B/PLACA ML 6.006 6.022 5.988 6.029 6.009 6.013 6.020 6.016 5.978
6,3 FILOS O DILATACIONES S/MURO ML 7.339 7.355 7.320 7.362 7.341 7.346 7.353 7.348 7.311
6,4 GOTERA EN MORTERO 1:4 ML 8.698 8.714 8.680 8.721 8.701 8.705 8.712 8.708 8.670
6,5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 7.324 7.324 7.324 7.324 7.324 7.324 7.324 7.324 7.324
6,6 MALLA BAJO ENTRAMADO M2 15.048 15.048 15.048 15.048 15.048 15.048 15.048 15.048 15.048
6,7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 25.639 25.686 25.585 25.707 25.646 25.659 25.679 25.666 25.558
6,8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 15.734 15.758 15.707 15.768 15.737 15.744 15.754 15.748 15.693
6,9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 22.207 22.253 22.155 22.272 22.213 22.226 22.246 22.233 22.129
6,10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 13.670 13.692 13.643 13.702 13.673 13.679 13.689 13.683 13.630
6,11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 21.267 21.314 21.213 21.335 21.274 21.287 21.308 21.294 21.186
6,12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 13.200 13.223 13.173 13.233 13.203 13.210 13.220 13.213 13.159
6,13 PAÑETE CULATAS 1:4, E=2 CM M2 22.207 22.253 22.155 22.272 22.213 22.226 22.246 22.233 22.129
6,14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 13.670 13.692 13.643 13.702 13.673 13.679 13.689 13.683 13.630
6,15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 22.700 22.734 22.661 22.748 22.705 22.714 22.729 22.719 22.642
6,16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 13.915 13.932 13.896 13.939 13.917 13.922 13.929 13.925 13.886
6,17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 18.585 18.620 18.545 18.635 18.590 18.600 18.615 18.605 18.525
6,18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 11.535 11.552 11.515 11.559 11.537 11.542 11.549 11.544 11.505
6,19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 17.869 17.905 17.828 17.920 17.874 17.884 17.900 17.889 17.807
6,20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 11.176 11.195 11.156 11.202 11.179 11.184 11.192 11.187 11.145
6,21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 23.081 23.127 23.029 23.147 23.088 23.101 23.120 23.107 23.003
6,22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 14.084 14.107 14.058 14.117 14.088 14.094 14.104 14.097 14.045
6,23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 22.141 22.189 22.087 22.209 22.148 22.162 22.182 22.168 22.060
6,24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 13.614 13.638 13.587 13.648 13.618 13.624 13.635 13.628 13.574
6,25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 18.555 18.591 18.513 18.606 18.560 18.570 18.586 18.575 18.493
6,26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 11.499 11.517 11.479 11.525 11.502 11.507 11.515 11.510 11.468
6,27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 23.141 23.188 23.086 23.208 23.147 23.161 23.181 23.168 23.059
6,28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 14.568 14.592 14.541 14.602 14.572 14.578 14.589 14.582 14.528

7 CUBIERTAS
7,1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 27.977 28.042 27.902 28.070 27.986 28.005 28.033 28.014 27.865
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7,2 M2 86.813 87.062 86.528 87.168 86.848 86.920 87.026 86.955 86.386
TELA IMPERMEABLE)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
7,3 BAJANTE PVC (AMAZONAS, RAINGO) ML CONSTRUCCIÓN
58.600 58.600 58.600 58.600 58.600 58.600 58.600 58.600 58.600
7,4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 23.764 23.764 23.764 23.764 23.764 23.764 23.764 23.764 23.764
7,5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 37.168 37.168 37.168 37.168 37.168 37.168 37.168 37.168 37.168
7,6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 85.273 85.273 85.273 85.273 85.273 85.273 85.273 85.273 85.273
7,7 CABALLETE FIJO TEJA FIBROCEMENTO ML 67.033 67.033 67.033 67.033 67.033 67.033 67.033 67.033 67.033
7,8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 39.482 39.482 39.482 39.482 39.482 39.482 39.482 39.482 39.482
7,9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 89.312 89.312 89.312 89.312 89.312 89.312 89.312 89.312 89.312
7,10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 106.417 106.417 106.417 106.417 106.417 106.417 106.417 106.417 106.417
7,11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 155.833 155.833 155.833 155.833 155.833 155.833 155.833 155.833 155.833
7,12 CABALLETE CUBIERTA TERMOACÚSTICA ML 62.449 62.449 62.449 62.449 62.449 62.449 62.449 62.449 62.449
7,13 CANAL PVC AMAZONAS ML 87.259 87.259 87.259 87.259 87.259 87.259 87.259 87.259 87.259
7,14 CANAL PVC RAINGO ML 79.545 79.545 79.545 79.545 79.545 79.545 79.545 79.545 79.545
7,15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 139.084 139.084 139.084 139.084 139.084 139.084 139.084 139.084 139.084
7,16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 80.946 80.946 80.946 80.946 80.946 80.946 80.946 80.946 80.946
7,17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 59.715 59.715 59.715 59.715 59.715 59.715 59.715 59.715 59.715
7,18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 34.997 34.997 34.997 34.997 34.997 34.997 34.997 34.997 34.997
7,19 TEJA DE BARRO M2 62.480 62.561 62.387 62.596 62.491 62.515 62.549 62.526 62.341
7,20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 49.748 49.748 49.748 49.748 49.748 49.748 49.748 49.748 49.748
7,21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 45.671 45.671 45.671 45.671 45.671 45.671 45.671 45.671 45.671
7,22 TEJA FIBROCEMENTO Nº4 M2 39.249 39.249 39.249 39.249 39.249 39.249 39.249 39.249 39.249
7,23 TEJA FIBROCEMENTO No. 6 M2 38.368 38.368 38.368 38.368 38.368 38.368 38.368 38.368 38.368
7,24 TEJA FIBROCEMENTO No. 8 M2 38.647 38.647 38.647 38.647 38.647 38.647 38.647 38.647 38.647
7,25 TEJA TERMOACÚSTICA M2 53.794 53.794 53.794 53.794 53.794 53.794 53.794 53.794 53.794
7,26 TEJA PLÁSTICA No.6 M2 47.440 47.440 47.440 47.440 47.440 47.440 47.440 47.440 47.440
7,27 TEJA ESPAÑOLA ETERNIT M2 85.994 85.994 85.994 85.994 85.994 85.994 85.994 85.994 85.994
7,28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 157.748 157.748 157.748 157.748 157.748 157.748 157.748 157.748 157.748
7,29 TEJA SIN TRASLAPO M2 71.307 71.307 71.307 71.307 71.307 71.307 71.307 71.307 71.307
7,30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 46.433 46.433 46.433 46.433 46.433 46.433 46.433 46.433 46.433
7,31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 36.103 36.103 36.103 36.103 36.103 36.103 36.103 36.103 36.103
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7,32 M2 61.775 61.775 61.775 61.775 61.775 61.775 61.775 61.775 61.775
ABIERTO 4"x2", 15 MM)
7,33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 21.913 21.913 21.913 21.913 21.913 21.913 21.913 21.913 21.913
7,34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 26.118 26.118 26.118 26.118 26.118 26.118 26.118 26.118 26.118
7,35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 28.116 28.116 28.116 28.116 28.116 28.116 28.116 28.116 28.116
7,36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 35.879 35.879 35.879 35.879 35.879 35.879 35.879 35.879 35.879
7,37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 23.985 23.985 23.985 23.985 23.985 23.985 23.985 23.985 23.985
7,38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 56.309 56.309 56.309 56.309 56.309 56.309 56.309 56.309 56.309
7,39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 371.499 371.499 371.499 371.499 371.499 371.499 371.499 371.499 371.499
7,40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 443.020 443.020 443.020 443.020 443.020 443.020 443.020 443.020 443.020
7,41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 286.639 286.639 286.639 286.639 286.639 286.639 286.639 286.639 286.639
7,42 CORTASOL CELOSIA C-23 EN ALUZINC M2 305.023 305.023 305.023 305.023 305.023 305.023 305.023 305.023 305.023

8 MORTEROS Y CONCRETOS
8,1 CONCRETO 4000 PSI M3 442.508 447.624 436.661 449.816 443.239 444.700 446.893 445.431 433.739
8,2 CONCRETO 3500 PSI M3 385.305 389.996 379.944 392.006 385.976 387.315 389.325 387.985 377.265
8,3 CONCRETO 3000 PSI M3 382.542 387.364 377.032 389.430 383.231 384.608 386.675 385.297 374.278
8,4 CONCRETO 2500 PSI M3 336.052 341.029 330.363 343.162 336.763 338.185 340.318 338.896 327.520
8,5 CONCRETO 2000 PSI M3 310.746 315.813 304.954 317.985 311.470 312.917 315.089 313.641 302.059
8,6 CONCRETO 1500 PSI M3 278.698 283.851 272.809 286.059 279.435 280.906 283.115 281.643 269.865
8,7 MORTERO SECO 1:10 M3 207.130 209.371 204.568 210.331 207.450 208.090 209.051 208.410 203.288
8,8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 432.905 435.082 430.418 436.014 433.216 433.838 434.771 434.149 429.175
8,9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 388.145 390.402 385.565 391.369 388.467 389.112 390.079 389.434 384.275
8,10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 455.070 457.181 452.657 458.086 455.372 455.975 456.880 456.276 451.451
8,11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 690.090 692.201 687.677 693.106 690.392 690.995 691.900 691.296 686.471
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
CONSTRUCCIÓN
9 CARPINTERÍA EN MADERA
9,1 BARANDA EN MADERA CEDRO MACHO ML 131.188 131.188 131.188 131.188 131.188 131.188 131.188 131.188 131.188
9,2 CHAZOS PARA CARPINTERÍA EN MADERA UN 3.940 3.956 3.921 3.963 3.942 3.947 3.954 3.949 3.912
9,3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 147.702 147.702 147.702 147.702 147.702 147.702 147.702 147.702 147.702
9,4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 179.873 179.873 179.873 179.873 179.873 179.873 179.873 179.873 179.873
9,5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 257.618 257.618 257.618 257.618 257.618 257.618 257.618 257.618 257.618
9,6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 286.499 286.499 286.499 286.499 286.499 286.499 286.499 286.499 286.499
9,7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 315.417 315.417 315.417 315.417 315.417 315.417 315.417 315.417 315.417
9,8 HOJA PUERTA FORTEC 0.81 UN 208.915 208.915 208.915 208.915 208.915 208.915 208.915 208.915 208.915
9,9 HOJA PUERTA FORTEC 0.91 UN 236.668 236.668 236.668 236.668 236.668 236.668 236.668 236.668 236.668
9,10 HOJA PUERTA FORTEC 1.50 UN 347.679 347.679 347.679 347.679 347.679 347.679 347.679 347.679 347.679
9,11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 132.594 132.594 132.594 132.594 132.594 132.594 132.594 132.594 132.594
9,12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 175.611 175.611 175.611 175.611 175.611 175.611 175.611 175.611 175.611
9,13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 195.038 195.038 195.038 195.038 195.038 195.038 195.038 195.038 195.038
9,14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 494.771 494.771 494.771 494.771 494.771 494.771 494.771 494.771 494.771
9,15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 45.132 45.132 45.132 45.132 45.132 45.132 45.132 45.132 45.132
9,16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 28.637 28.637 28.637 28.637 28.637 28.637 28.637 28.637 28.637
9,17 VENTANERÍA EN MADERA CEDRO MACHO M2 106.782 106.782 106.782 106.782 106.782 106.782 106.782 106.782 106.782
9,18 CERRADURA DE ENTRADA PRINCIPAL UN 126.914 126.914 126.914 126.914 126.914 126.914 126.914 126.914 126.914
9,19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 98.744 98.744 98.744 98.744 98.744 98.744 98.744 98.744 98.744
9,20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 31.082 31.082 31.082 31.082 31.082 31.082 31.082 31.082 31.082
9,21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 31.082 31.082 31.082 31.082 31.082 31.082 31.082 31.082 31.082
9,22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 29.500 29.500 29.500 29.500 29.500 29.500 29.500 29.500 29.500
9,23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 45.306 45.306 45.306 45.306 45.306 45.306 45.306 45.306 45.306
9,24 ESPEJO BISELADO INCOLORO 4 MM M2 55.818 55.818 55.818 55.818 55.818 55.818 55.818 55.818 55.818
9,25 VIDRIO ESMERILADO INCOLORO 4 MM M2 67.030 67.030 67.030 67.030 67.030 67.030 67.030 67.030 67.030
9,26 VIDRIO ESMERILADO INCOLORO 5 MM M2 80.345 80.345 80.345 80.345 80.345 80.345 80.345 80.345 80.345
9,27 VIDRIO TEMPLADO PULIDO 10 MM M2 374.865 374.865 374.865 374.865 374.865 374.865 374.865 374.865 374.865
9,28 VIDRIO TEMPLADO PULIDO 8 MM M2 262.743 262.743 262.743 262.743 262.743 262.743 262.743 262.743 262.743
9,29 VIDRIO TRANSPARENTE 3 MM M2 36.196 36.196 36.196 36.196 36.196 36.196 36.196 36.196 36.196
9,30 VIDRIO TRANSPARENTE 4 MM M2 46.007 46.007 46.007 46.007 46.007 46.007 46.007 46.007 46.007
9,31 VIDRIO TRANSPARENTE 5 MM M2 55.818 55.818 55.818 55.818 55.818 55.818 55.818 55.818 55.818
9,32 VIDRIO TRANSPARENTE 6 MM M2 69.833 69.833 69.833 69.833 69.833 69.833 69.833 69.833 69.833

10 CARPINTERÍA METÁLICA
10,1 CAJA CONTADOR DE AGUA UN 81.292 81.292 81.292 81.292 81.292 81.292 81.292 81.292 81.292
10,2 CELOSÍA ALUMINIO 100CM X 60 CM M2 222.230 222.230 222.230 222.230 222.230 222.230 222.230 222.230 222.230
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10,3 ML 86.670 86.670 86.670 86.670 86.670 86.670 86.670 86.670 86.670
ANTICORROSIVO)
10,4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 157.195 157.195 157.195 157.195 157.195 157.195 157.195 157.195 157.195
10,5 MARCO TAPA CAJA DE INSPECCIÓN UN 146.350 146.350 146.350 146.350 146.350 146.350 146.350 146.350 146.350
10,6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 96.130 96.130 96.130 96.130 96.130 96.130 96.130 96.130 96.130
10,7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 225.432 225.432 225.432 225.432 225.432 225.432 225.432 225.432 225.432
10,8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 118.080 118.080 118.080 118.080 118.080 118.080 118.080 118.080 118.080
10,9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 7.123 7.123 7.123 7.123 7.123 7.123 7.123 7.123 7.123
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10,10 M2 108.832 108.832 108.832 108.832 108.832 108.832 108.832 108.832 108.832
ESTRUCTURAL GALVANIZADO 2")
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00
10,10(1) M2 128.659 128.659 128.659 128.659 128.659 128.659 128.659 128.659 128.659
MTS
10,11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 44.748 44.748 44.748 44.748 44.748 44.748 44.748 44.748 44.748
10,12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 565.046 565.046 565.046 565.046 565.046 565.046 565.046 565.046 565.046
10,13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 204.518 204.518 204.518 204.518 204.518 204.518 204.518 204.518 204.518
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

10,14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 CONSTRUCCIÓN
231.918 231.918 231.918 231.918 231.918 231.918 231.918 231.918 231.918
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10,15 M2 516.685 516.685 516.685 516.685 516.685 516.685 516.685 516.685 516.685
ACCESORIOS)
10,16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 139.655 139.655 139.655 139.655 139.655 139.655 139.655 139.655 139.655
10,17 PUERTA CORTINA INCLUYE ESMALTE M2 411.357 411.357 411.357 411.357 411.357 411.357 411.357 411.357 411.357
10,18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 6.492 6.492 6.492 6.492 6.492 6.492 6.492 6.492 6.492
10,19 VENTANA EN ALUMINIO CORREDIZA M2 290.887 290.887 290.887 290.887 290.887 290.887 290.887 290.887 290.887
10,20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 132.466 132.466 132.466 132.466 132.466 132.466 132.466 132.466 132.466
10,21 REJILLA PISO 0.30 M M2 91.969 91.969 91.969 91.969 91.969 91.969 91.969 91.969 91.969
10,22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 95.292 95.292 95.292 95.292 95.292 95.292 95.292 95.292 95.292
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10,23 KG 11.403 11.403 11.403 11.403 11.403 11.403 11.403 11.403 11.403
TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN,
SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10,24 KG 12.607 12.607 12.607 12.607 12.607 12.607 12.607 12.607 12.607
AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10,25 KG 10.108 10.108 10.108 10.108 10.108 10.108 10.108 10.108 10.108
COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11,1 ACOMETIDA EN PVC 1/2" 5M UN 240.182 240.182 240.182 240.182 240.182 240.182 240.182 240.182 240.182
11,2 ACOMETIDA EN PVC 3/4" 5M UN 287.535 287.535 287.535 287.535 287.535 287.535 287.535 287.535 287.535
11,3 BAJANTE AGUAS LLUVIAS PVC 3" ML 23.764 23.764 23.764 23.764 23.764 23.764 23.764 23.764 23.764
11,4 BAJANTE AGUAS LLUVIAS PVC 4" ML 37.168 37.168 37.168 37.168 37.168 37.168 37.168 37.168 37.168
11,5 BAJANTE AGUAS RESIDUALES PVC 3" ML 35.904 35.904 35.904 35.904 35.904 35.904 35.904 35.904 35.904
11,6 BAJANTE AGUAS RESIDUALES PVC 4" ML 45.795 45.795 45.795 45.795 45.795 45.795 45.795 45.795 45.795
11,7 BAJANTE AGUAS RESIDUALES PVC 6" ML 93.764 93.764 93.764 93.764 93.764 93.764 93.764 93.764 93.764
11,8 CONEXIÓN TANQUE ELEVADO PVC UN 241.592 241.592 241.592 241.592 241.592 241.592 241.592 241.592 241.592
11,9 INSTALACIÓN APARATO SANITARIO UN 49.667 49.667 49.667 49.667 49.667 49.667 49.667 49.667 49.667
11,10 INSTALACIÓN BOMBAS AGUA UN 692.518 692.518 692.518 692.518 692.518 692.518 692.518 692.518 692.518
11,11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 1.425.773 1.425.773 1.425.773 1.425.773 1.425.773 1.425.773 1.425.773 1.425.773 1.425.773
11,12 LLAVE MANGUERA UN 38.168 38.168 38.168 38.168 38.168 38.168 38.168 38.168 38.168
11,13 NIPLE PASAMURO 2" UN 73.454 73.454 73.454 73.454 73.454 73.454 73.454 73.454 73.454
11,14 NIPLE PASAMURO 4" UN 109.494 109.494 109.494 109.494 109.494 109.494 109.494 109.494 109.494
11,15 PUNTO AGUA CALIENTE CPVC UN 91.557 91.557 91.557 91.557 91.557 91.557 91.557 91.557 91.557
11,16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 67.916 67.916 67.916 67.916 67.916 67.916 67.916 67.916 67.916
11,17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 71.978 71.978 71.978 71.978 71.978 71.978 71.978 71.978 71.978
11,18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 90.895 90.895 90.895 90.895 90.895 90.895 90.895 90.895 90.895
11,19 SALIDA SANITARIA PVC-S/PARAL 2" UN 72.535 72.535 72.535 72.535 72.535 72.535 72.535 72.535 72.535
11,20 SALIDA SANITARIA PVC-S/PARAL 3" UN 89.871 89.871 89.871 89.871 89.871 89.871 89.871 89.871 89.871
11,21 SALIDA SANITARIA PVC-S/PARAL 4" UN 95.877 95.877 95.877 95.877 95.877 95.877 95.877 95.877 95.877
11,22 SALIDA SANITARIA PVC-S/SIFON 3" UN 78.475 78.475 78.475 78.475 78.475 78.475 78.475 78.475 78.475
11,23 RED SUMINISTRO CPVC 1/2" ML 13.395 13.395 13.395 13.395 13.395 13.395 13.395 13.395 13.395
11,24 RED SUMINISTRO CPVC 3/4" ML 18.687 18.687 18.687 18.687 18.687 18.687 18.687 18.687 18.687
11,25 RED SUMINISTRO PVC 1 1/2" ML 24.434 24.434 24.434 24.434 24.434 24.434 24.434 24.434 24.434
11,26 RED SUMINISTRO PVC 1" ML 15.200 15.200 15.200 15.200 15.200 15.200 15.200 15.200 15.200
11,27 RED SUMINISTRO PVC 1/2" ML 9.153 9.153 9.153 9.153 9.153 9.153 9.153 9.153 9.153
11,28 RED SUMINISTRO PVC 2 1/2" ML 53.998 53.998 53.998 53.998 53.998 53.998 53.998 53.998 53.998
11,29 RED SUMINISTRO PVC 2" ML 34.684 34.684 34.684 34.684 34.684 34.684 34.684 34.684 34.684
11,30 RED SUMINISTRO PVC 3/4" ML 11.412 11.412 11.412 11.412 11.412 11.412 11.412 11.412 11.412
11,31 RED SANITARIA PVC-S 2" ML 26.953 26.953 26.953 26.953 26.953 26.953 26.953 26.953 26.953
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
11,32 RED SANITARIA PVC-S 3" ML CONSTRUCCIÓN
37.261 37.261 37.261 37.261 37.261 37.261 37.261 37.261 37.261
11,33 RED SANITARIA PVC-S 4" ML 50.474 50.474 50.474 50.474 50.474 50.474 50.474 50.474 50.474
11,34 RED SANITARIA PVC-S 6" ML 93.430 93.430 93.430 93.430 93.430 93.430 93.430 93.430 93.430
11,35 REGISTRO 1" UN 114.296 114.296 114.296 114.296 114.296 114.296 114.296 114.296 114.296
11,36 REGISTRO 1/2" UN 63.861 63.861 63.861 63.861 63.861 63.861 63.861 63.861 63.861
11,37 REGISTRO 3/4" UN 80.957 80.957 80.957 80.957 80.957 80.957 80.957 80.957 80.957
11,38 REGISTRO 1 1/2" UN 194.503 194.503 194.503 194.503 194.503 194.503 194.503 194.503 194.503
11,39 REGISTRO 2 1/2" UN 399.414 399.414 399.414 399.414 399.414 399.414 399.414 399.414 399.414
11,40 REGISTRO 2" UN 295.778 295.778 295.778 295.778 295.778 295.778 295.778 295.778 295.778
11,41 REVENTILACIÓN 2" ML 18.887 18.887 18.887 18.887 18.887 18.887 18.887 18.887 18.887
11,42 REVENTILACIÓN 3" ML 23.799 23.799 23.799 23.799 23.799 23.799 23.799 23.799 23.799
11,43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 184.929 184.929 184.929 184.929 184.929 184.929 184.929 184.929 184.929

11,44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 299.488 299.488 299.488 299.488 299.488 299.488 299.488 299.488 299.488

11,45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 497.245 497.245 497.245 497.245 497.245 497.245 497.245 497.245 497.245
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
11,46 ML 42.712 42.712 42.712 42.712 42.712 42.712 42.712 42.712 42.712
SOPORTES)
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y
11,47 ML 50.349 50.349 50.349 50.349 50.349 50.349 50.349 50.349 50.349
SOPORTES)
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,48 ML 65.079 65.079 65.079 65.079 65.079 65.079 65.079 65.079 65.079
SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11,49 ML 73.494 73.494 73.494 73.494 73.494 73.494 73.494 73.494 73.494
SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y
11,50 ML 94.673 94.673 94.673 94.673 94.673 94.673 94.673 94.673 94.673
SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11,51 ML 110.459 110.459 110.459 110.459 110.459 110.459 110.459 110.459 110.459
SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
11,52 ML 163.520 163.520 163.520 163.520 163.520 163.520 163.520 163.520 163.520
SOPORTES)
11,53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 66.569 66.569 66.569 66.569 66.569 66.569 66.569 66.569 66.569
11,54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 66.831 66.831 66.831 66.831 66.831 66.831 66.831 66.831 66.831
11,55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 42.514 42.514 42.514 42.514 42.514 42.514 42.514 42.514 42.514
11,56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 52.172 52.172 52.172 52.172 52.172 52.172 52.172 52.172 52.172
11,57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 4.375 4.375 4.375 4.375 4.375 4.375 4.375 4.375 4.375
11,58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 6.875 6.875 6.875 6.875 6.875 6.875 6.875 6.875 6.875
11,59 GABINETE TIPO III UN 1.067.138 1.067.138 1.067.138 1.067.138 1.067.138 1.067.138 1.067.138 1.067.138 1.067.138
11,60 GABINETE TIPO I UN 817.638 817.638 817.638 817.638 817.638 817.638 817.638 817.638 817.638
11,61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 2.727.603 2.727.603 2.727.603 2.727.603 2.727.603 2.727.603 2.727.603 2.727.603 2.727.603
11,62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 2.276.249 2.276.249 2.276.249 2.276.249 2.276.249 2.276.249 2.276.249 2.276.249 2.276.249
11,63 VÁLVULA MARIPOSA 3" UN 669.068 669.068 669.068 669.068 669.068 669.068 669.068 669.068 669.068
11,64 VÁLVULA MARIPOSA 4" UN 862.229 862.229 862.229 862.229 862.229 862.229 862.229 862.229 862.229
11,65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 328.289 328.289 328.289 328.289 328.289 328.289 328.289 328.289 328.289

12 INSTALACIONES ELÉCTRICAS
12,1 ACOMETIDA AÉREA 10 M. PVC UN 384.838 384.838 384.838 384.838 384.838 384.838 384.838 384.838 384.838
12,2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 61.121 61.121 61.121 61.121 61.121 61.121 61.121 61.121 61.121
12,3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 72.171 72.171 72.171 72.171 72.171 72.171 72.171 72.171 72.171
12,4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 80.353 80.353 80.353 80.353 80.353 80.353 80.353 80.353 80.353
12,5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 94.401 94.401 94.401 94.401 94.401 94.401 94.401 94.401 94.401
12,6 SALIDA TELÉFONO PVC COMPLETA UN 57.583 57.583 57.583 57.583 57.583 57.583 57.583 57.583 57.583
12,7 SALIDA TIMBRE PVC COMPLETA UN 65.541 65.541 65.541 65.541 65.541 65.541 65.541 65.541 65.541
12,8 STRIP TELEFÓNICO 10 PARES UN 152.528 152.528 152.528 152.528 152.528 152.528 152.528 152.528 152.528
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
12,9 SALIDA TOMA DOBLE PVC COMPLETA UN CONSTRUCCIÓN
59.040 59.040 59.040 59.040 59.040 59.040 59.040 59.040 59.040
12,10 SALIDA TRIFÁSICA PVC COMPLETA UN 135.420 135.420 135.420 135.420 135.420 135.420 135.420 135.420 135.420
12,11 SALIDA T.V PVC COMPLETA. UN 81.198 81.198 81.198 81.198 81.198 81.198 81.198 81.198 81.198
12,12 SALIDA BIFÁSICA C.N. UN 48.118 48.118 48.118 48.118 48.118 48.118 48.118 48.118 48.118
12,13 TABLERO PARCIAL 4 CIRCUITOS UN 101.982 101.982 101.982 101.982 101.982 101.982 101.982 101.982 101.982
12,14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 436.007 436.007 436.007 436.007 436.007 436.007 436.007 436.007 436.007
12,15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 579.574 579.574 579.574 579.574 579.574 579.574 579.574 579.574 579.574
12,16 TUBERÍA PVC CONDUIT 1/2" ML 3.748 3.748 3.748 3.748 3.748 3.748 3.748 3.748 3.748
12,17 TUBERÍA PVC CONDUIT 3/4" ML 4.956 4.956 4.956 4.956 4.956 4.956 4.956 4.956 4.956
12,18 TUBERÍA PVC CONDUIT 1" ML 7.691 7.691 7.691 7.691 7.691 7.691 7.691 7.691 7.691
12,19 TUBERÍA PVC CONDUIT 1 1/2" ML 13.774 13.774 13.774 13.774 13.774 13.774 13.774 13.774 13.774
12,20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 288.837 288.837 288.837 288.837 288.837 288.837 288.837 288.837 288.837
12,21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 82.014 82.014 82.014 82.014 82.014 82.014 82.014 82.014 82.014
12,22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 110.347 110.347 110.347 110.347 110.347 110.347 110.347 110.347 110.347
12,23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 46.168 46.168 46.168 46.168 46.168 46.168 46.168 46.168 46.168
12,24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.487.745 1.487.745 1.487.745 1.487.745 1.487.745 1.487.745 1.487.745 1.487.745 1.487.745
12,25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.102.479 1.102.479 1.102.479 1.102.479 1.102.479 1.102.479 1.102.479 1.102.479 1.102.479
12,26 POSTE METÁLICO 6M UN 1.358.711 1.358.711 1.358.711 1.358.711 1.358.711 1.358.711 1.358.711 1.358.711 1.358.711
12,27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 630.150 630.150 630.150 630.150 630.150 630.150 630.150 630.150 630.150
12,28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 116.517 116.517 116.517 116.517 116.517 116.517 116.517 116.517 116.517
12,29 LUMINARIA 70W SODIO UN 528.260 528.260 528.260 528.260 528.260 528.260 528.260 528.260 528.260
12,30 LUMINARIA 150W SODIO UN 660.262 660.262 660.262 660.262 660.262 660.262 660.262 660.262 660.262
12,31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.739.886 1.739.886 1.739.886 1.739.886 1.739.886 1.739.886 1.739.886 1.739.886 1.739.886
12,32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.281.962 1.281.962 1.281.962 1.281.962 1.281.962 1.281.962 1.281.962 1.281.962 1.281.962

13 PISOS BASES
13,1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 41.018 41.099 40.925 41.134 41.029 41.053 41.087 41.064 40.879
13,2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 40.182 40.263 40.089 40.298 40.194 40.217 40.252 40.229 40.043
13,3 ALISTADO PARA LISTÓN M2 15.807 15.823 15.789 15.830 15.810 15.814 15.821 15.817 15.779
13,4 ALISTADO PISOS 1:3, E=0.04 M2 26.305 26.467 26.119 26.537 26.328 26.375 26.444 26.398 26.027
13,5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 86.177 86.340 85.992 86.409 86.200 86.247 86.316 86.270 85.899
13,6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 28.849 28.950 28.733 28.994 28.863 28.892 28.936 28.907 28.675
13,7 CONCRETO BASE GRADAS 2500 PSI M2 58.982 59.480 58.413 59.693 59.053 59.195 59.409 59.266 58.129
13,8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 80.419 81.215 79.509 81.557 80.533 80.760 81.102 80.874 79.054
13,9 MANTO FIBERGLASS 600X1 M2 32.498 32.498 32.498 32.498 32.498 32.498 32.498 32.498 32.498
13,10 PEGANTE MORTERO-CONCRETO M2 25.077 25.077 25.077 25.077 25.077 25.077 25.077 25.077 25.077
13,11 PERMA PLY 2 CAPAS M2 29.595 29.595 29.595 29.595 29.595 29.595 29.595 29.595 29.595
13,12 PLACA BASE CONCRETO 0.08 2500 PSI M2 47.534 47.982 47.022 48.174 47.598 47.726 47.918 47.790 46.766
13,13 PLACA BASE CONCRETO 0.10 2500 PSI M2 55.425 55.973 54.799 56.207 55.503 55.660 55.894 55.738 54.487
13,14 PLACA BASE CONCRETO 0.15 2500 PSI M2 79.620 80.466 78.653 80.829 79.741 79.983 80.345 80.104 78.170
13,15 TRITURADO FINO 1/2 M3 79.882 83.377 75.888 84.875 80.382 81.380 82.878 81.880 73.892
13,16 TRITURADO GRUESO 3/4 M3 90.986 95.099 87.194 95.725 92.255 94.397 91.839 92.881 85.298

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14,1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 60.894 60.926 60.857 60.940 60.898 60.908 60.922 60.912 60.838
14,2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 36.817 36.833 36.799 36.840 36.820 36.824 36.831 36.826 36.789
14,3 ADOQUÍN CONCRETO 6CM M2 68.641 68.722 68.548 68.757 68.652 68.675 68.710 68.687 68.501
14,4 ADOQUÍN CONCRETO 8CM M2 72.091 72.172 71.998 72.207 72.102 72.125 72.160 72.137 71.951
14,5 ADOQUÍN GRES PEATONAL M2 76.665 76.746 76.572 76.781 76.677 76.700 76.735 76.711 76.526
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14,6 M2 79.816 79.849 79.779 79.862 79.821 79.830 79.844 79.835 79.760
INCLUYE ALISTADO
14,7 GRAVILLA PARA GRADAS ML 41.423 41.476 41.362 41.498 41.430 41.446 41.468 41.453 41.332
14,8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 171.424 171.570 171.257 171.633 171.445 171.486 171.549 171.507 171.173
14,9 ACABADO EN GRAVILLA LAVADA M2 50.417 50.539 50.278 50.592 50.435 50.470 50.522 50.487 50.208
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
14,10 GUARDAESCOBA EN GRANITO ML CONSTRUCCIÓN
48.461 48.461 48.461 48.461 48.461 48.461 48.461 48.461 48.461
14,11 GUARDAESCOBA EN GRAVILLA ML 10.870 10.923 10.810 10.946 10.878 10.893 10.916 10.901 10.780
14,12 GUARDAESCOBA PVC CARAMELO ML 9.945 9.945 9.945 9.945 9.945 9.945 9.945 9.945 9.945
14,13 GUARDAESCOBA PVC CEDRO ML 13.306 13.306 13.306 13.306 13.306 13.306 13.306 13.306 13.306
14,14 GUARDAESCOBA PINO CARIBE ML 11.457 11.457 11.457 11.457 11.457 11.457 11.457 11.457 11.457
14,15 GUARDAESCOBA CEDRO BLANCO ML 18.888 18.888 18.888 18.888 18.888 18.888 18.888 18.888 18.888
14,16 GUARDAESCOBA EN MADERA SAPAN ML 36.373 36.373 36.373 36.373 36.373 36.373 36.373 36.373 36.373
14,17 GUARDAESCOBA GRES Y CERÁMICA ML 10.348 10.348 10.348 10.348 10.348 10.348 10.348 10.348 10.348
14,18 LISTÓN M.H. AMARILLO M2 80.502 80.502 80.502 80.502 80.502 80.502 80.502 80.502 80.502
14,19 PASO ESCALERA GRANITO ML 126.280 126.394 126.150 126.443 126.296 126.329 126.378 126.345 126.085
14,20 PIRLANES ALUMINIO ML 8.546 8.546 8.546 8.546 8.546 8.546 8.546 8.546 8.546
14,21 PIRLANES LADRILLO ML 34.658 34.691 34.621 34.705 34.663 34.672 34.686 34.677 34.603
14,22 PISO VINILO TRÁFICO RESIDENCIAL M2 49.023 49.023 49.023 49.023 49.023 49.023 49.023 49.023 49.023
14,23 PISO VINILO TRÁFICO PESADO M2 56.761 56.761 56.761 56.761 56.761 56.761 56.761 56.761 56.761
14,24 PULIDA LACADA PISO MADERA M2 53.602 53.602 53.602 53.602 53.602 53.602 53.602 53.602 53.602
14,25 TABLETA DE GRES 25X25 M2 52.862 52.894 52.824 52.908 52.866 52.875 52.889 52.880 52.806
14,26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 59.207 59.240 59.170 59.254 59.212 59.221 59.235 59.226 59.152
14,27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 12.155 12.155 12.155 12.155 12.155 12.155 12.155 12.155 12.155
14,28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 52.623 52.672 52.568 52.693 52.630 52.644 52.665 52.651 52.540
14,29 JABONERA PORCELANA ACUARIO UN 22.090 22.090 22.090 22.090 22.090 22.090 22.090 22.090 22.090
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14,30 UN 131.374 131.374 131.374 131.374 131.374 131.374 131.374 131.374 131.374
Y PERCHA SIMPLE)
14,31 REJILLA PLÁSTICA SOSCO 3X2 UN 11.070 11.070 11.070 11.070 11.070 11.070 11.070 11.070 11.070
14,32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 24.227 24.227 24.227 24.227 24.227 24.227 24.227 24.227 24.227
14,33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 15.788 15.788 15.788 15.788 15.788 15.788 15.788 15.788 15.788
14,34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 15.358 15.358 15.358 15.358 15.358 15.358 15.358 15.358 15.358
14,35 REMATES BOCEL ALUMINIO ML 9.573 9.573 9.573 9.573 9.573 9.573 9.573 9.573 9.573
14,36 REMATES BOCEL PORCELANA ML 9.731 9.731 9.731 9.731 9.731 9.731 9.731 9.731 9.731
14,37 TAPA REGISTRO 20X20 UN 20.630 20.630 20.630 20.630 20.630 20.630 20.630 20.630 20.630
14,38 TAPA REGISTRO 6X6 UN 18.861 18.861 18.861 18.861 18.861 18.861 18.861 18.861 18.861
14,39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 19.566 19.566 19.566 19.566 19.566 19.566 19.566 19.566 19.566
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN
14,40 M2 22.619 22.619 22.619 22.619 22.619 22.619 22.619 22.619 22.619
SITIO
14,41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 69.044 69.076 69.007 69.090 69.048 69.058 69.072 69.062 68.988
14,42 MEDIA CAÑA EN GRANITO ML 81.859 81.859 81.859 81.859 81.859 81.859 81.859 81.859 81.859
14,43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 38.620 38.620 38.620 38.620 38.620 38.620 38.620 38.620 38.620
14,44 PINTURA ACRÍLICA PARA PISOS M2 14.407 14.407 14.407 14.407 14.407 14.407 14.407 14.407 14.407
14,45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 106.807 106.807 106.807 106.807 106.807 106.807 106.807 106.807 106.807
14,46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 129.905 129.905 129.905 129.905 129.905 129.905 129.905 129.905 129.905

15 CIELO RASO
15,1 APLIQUE YESO ML 77.007 77.007 77.007 77.007 77.007 77.007 77.007 77.007 77.007
15,2 ARMADURA MADERA Y MALLA M2 40.015 40.015 40.015 40.015 40.015 40.015 40.015 40.015 40.015
15,3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 60.163 60.163 60.163 60.163 60.163 60.163 60.163 60.163 60.163
15,4 CIELO RASO DURACUSTIC M2 73.334 73.334 73.334 73.334 73.334 73.334 73.334 73.334 73.334
15,5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 54.926 54.926 54.926 54.926 54.926 54.926 54.926 54.926 54.926
15,6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 100.948 100.948 100.948 100.948 100.948 100.948 100.948 100.948 100.948
15,7 CORNISAS YESO ML 51.557 51.557 51.557 51.557 51.557 51.557 51.557 51.557 51.557
15,8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 111.109 111.109 111.109 111.109 111.109 111.109 111.109 111.109 111.109
15,9 MALLA CON VENA M2 14.948 14.948 14.948 14.948 14.948 14.948 14.948 14.948 14.948

16 EXCAVACIONES Y RELLENOS
16,1 EXPLANACIÓN Y EXTENDIDA M3 5.946 5.946 5.946 5.946 5.946 5.946 5.946 5.946 5.946
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

16,2
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
M3 CONSTRUCCIÓN
18.928 18.928 18.928 18.928 18.928 18.928 18.928 18.928 18.928
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 29.108 29.108 29.108 29.108 29.108 29.108 29.108 29.108 29.108
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16,4 M3 48.310 48.310 48.310 48.310 48.310 48.310 48.310 48.310 48.310
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16,5 M3 55.367 55.367 55.367 55.367 55.367 55.367 55.367 55.367 55.367
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16,6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 94.475 94.475 94.475 94.475 94.475 94.475 94.475 94.475 94.475
16,7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 20.944 20.944 20.944 20.944 20.944 20.944 20.944 20.944 20.944
16,8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 78.196 81.818 78.196 78.196 81.818 87.250 69.141 78.196 78.196
16,9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 89.779 93.820 85.161 95.552 90.356 91.511 93.243 92.089 82.852
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16,10 M3 119.848 118.037 148.822 143.390 168.742 128.902 121.659 130.713 172.364
MECÁNICAMENTE
16,11 AFRIMADO (NORMA INVIAS 311) M3 64.039 70.190 66.568 66.568 70.190 75.623 57.514 61.136 66.568
16,12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 110.543 108.732 139.517 134.085 159.437 119.598 112.354 121.408 128.652
16,13 BASE GRANULAR (NORMA INVIAS 330) M3 115.748 113.937 144.722 139.290 164.642 124.802 117.559 126.613 168.264

17 APARATOS SANITARIOS
17,1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 320.259 320.259 320.259 320.259 320.259 320.259 320.259 320.259 320.259
17,2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 936.409 936.409 936.409 936.409 936.409 936.409 936.409 936.409 936.409
17,3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 509.038 509.038 509.038 509.038 509.038 509.038 509.038 509.038 509.038
17,4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 150.999 150.999 150.999 150.999 150.999 150.999 150.999 150.999 150.999
17,5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 209.108 209.108 209.108 209.108 209.108 209.108 209.108 209.108 209.108
17,6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 194.496 194.496 194.496 194.496 194.496 194.496 194.496 194.496 194.496
17,7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 423.142 423.142 423.142 423.142 423.142 423.142 423.142 423.142 423.142
17,8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 1.076.203 1.076.203 1.076.203 1.076.203 1.076.203 1.076.203 1.076.203 1.076.203 1.076.203
17,9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 308.522 308.522 308.522 308.522 308.522 308.522 308.522 308.522 308.522
17,10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 220.243 220.243 220.243 220.243 220.243 220.243 220.243 220.243 220.243
17,11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 89.967 89.967 89.967 89.967 89.967 89.967 89.967 89.967 89.967
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17,12 UN 265.228 265.228 265.228 265.228 265.228 265.228 265.228 265.228 265.228
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17,13 UN 388.729 388.729 388.729 388.729 388.729 388.729 388.729 388.729 388.729
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

18 PINTURAS
18,1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 9.142 9.142 9.142 9.142 9.142 9.142 9.142 9.142 9.142
18,2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 3.357 3.357 3.357 3.357 3.357 3.357 3.357 3.357 3.357
18,3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 12.343 12.343 12.343 12.343 12.343 12.343 12.343 12.343 12.343
18,4 BARNIZ SOBRE MUEBLES M2 45.925 45.925 45.925 45.925 45.925 45.925 45.925 45.925 45.925
18,5 CARBURO SOBRE PAÑETES M2 6.459 6.459 6.459 6.459 6.459 6.459 6.459 6.459 6.459
18,6 COLORPLAST FACHADA SOBRE FACHADA M2 69.228 69.228 69.228 69.228 69.228 69.228 69.228 69.228 69.228
18,7 DEMARCACIÓN CON MARMOLINA ML 3.867 3.867 3.867 3.867 3.867 3.867 3.867 3.867 3.867
18,8 ESMALTE SOBRE LÁMINA LINEAL ML 3.025 3.025 3.025 3.025 3.025 3.025 3.025 3.025 3.025
18,9 ESMALTE SOBRE LÁMINA LLENA M2 15.309 15.309 15.309 15.309 15.309 15.309 15.309 15.309 15.309
18,10 ESMALTE SOBRE MADERA LINEAL ML 4.412 4.412 4.412 4.412 4.412 4.412 4.412 4.412 4.412
18,11 ESMALTE SOBRE MADERA LLENA M2 16.131 16.131 16.131 16.131 16.131 16.131 16.131 16.131 16.131
18,12 ESMALTE SOBRE MARCOS LÁMINA M2 6.167 6.167 6.167 6.167 6.167 6.167 6.167 6.167 6.167
18,13 ESMALTE SOBRE MARCOS MADERA M2 7.050 7.050 7.050 7.050 7.050 7.050 7.050 7.050 7.050
18,14 ESTUCO M2 7.813 7.813 7.813 7.813 7.813 7.813 7.813 7.813 7.813
18,15 ESTUCO (LINEAL) ML 4.912 4.912 4.912 4.912 4.912 4.912 4.912 4.912 4.912
18,16 ESTUCO Y VINILO 3 MANOS M2 17.083 17.083 17.083 17.083 17.083 17.083 17.083 17.083 17.083
18,17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 10.653 10.653 10.653 10.653 10.653 10.653 10.653 10.653 10.653
18,18 LACA PISOS MADERA M2 25.313 25.313 25.313 25.313 25.313 25.313 25.313 25.313 25.313
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
18,19 LÍNEAS TRÁFICO 0.10 ML CONSTRUCCIÓN
2.967 2.967 2.967 2.967 2.967 2.967 2.967 2.967 2.967
18,20 MARMOLINA SOBRE PAÑETE M2 13.114 13.114 13.114 13.114 13.114 13.114 13.114 13.114 13.114
18,21 TINTILLA SOBRE MADERA LINEAL ML 3.548 3.548 3.548 3.548 3.548 3.548 3.548 3.548 3.548
18,22 TINTILLA SOBRE MADERA LLENA M2 13.806 13.806 13.806 13.806 13.806 13.806 13.806 13.806 13.806
18,23 VINILO SOBRE PAÑETE 2 MANOS M2 7.788 7.788 7.788 7.788 7.788 7.788 7.788 7.788 7.788
18,24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML 4.928 4.928 4.928 4.928 4.928 4.928 4.928 4.928 4.928
18,25 WASH-PRIMER SOBRE ALUMNIO M2 23.571 23.571 23.571 23.571 23.571 23.571 23.571 23.571 23.571
18,26 PINTURA EPÓXICA M2 14.019 14.019 14.019 14.019 14.019 14.019 14.019 14.019 14.019
18,27 PINTURA EPÓXICA (LINEAL) ML 8.706 8.706 8.706 8.706 8.706 8.706 8.706 8.706 8.706

19 DOTACIONES DEPORTIVAS
19,1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 6.352.040 6.352.040 6.352.040 6.352.040 6.352.040 6.352.040 6.352.040 6.352.040 6.352.040
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19,2 UN 11.223.172 11.223.172 11.223.172 11.223.172 11.223.172 11.223.172 11.223.172 11.223.172 11.223.172
CILINDRO PARA MOVILIZAR (PAR)
19,3 CANCHA PARA MICROFÚTBOL (PAR) UN 2.937.584 2.937.584 2.937.584 2.937.584 2.937.584 2.937.584 2.937.584 2.937.584 2.937.584
19,4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 9.599.115 9.599.115 9.599.115 9.599.115 9.599.115 9.599.115 9.599.115 9.599.115 9.599.115
19,5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.986.885 8.986.885 8.986.885 8.986.885 8.986.885 8.986.885 8.986.885 8.986.885 8.986.885
19,6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2.967 2.967 2.967 2.967 2.967 2.967 2.967 2.967 2.967
19,7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 903.995 903.995 903.995 903.995 903.995 903.995 903.995 903.995 903.995
19,8 MALLA NYLON PETROLIZADA VOLEIBOL UN 89.981 89.981 89.981 89.981 89.981 89.981 89.981 89.981 89.981
19,9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.631.697 1.631.748 1.631.638 1.631.770 1.631.704 1.631.719 1.631.741 1.631.726 1.631.609
19,10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 705.463 706.669 704.086 707.185 705.635 705.980 706.496 706.152 703.397

20 INSTALACIONES RED GASES


20,1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 31.117 31.117 31.117 31.117 31.117 31.117 31.117 31.117 31.117
20,2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 46.100 46.100 46.100 46.100 46.100 46.100 46.100 46.100 46.100
20,3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 57.121 57.121 57.121 57.121 57.121 57.121 57.121 57.121 57.121
20,4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 18.781 18.781 18.781 18.781 18.781 18.781 18.781 18.781 18.781
20,5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 22.729 22.729 22.729 22.729 22.729 22.729 22.729 22.729 22.729
20,6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 30.929 30.929 30.929 30.929 30.929 30.929 30.929 30.929 30.929
20,7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 27.757 27.757 27.757 27.757 27.757 27.757 27.757 27.757 27.757
20,8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 29.285 29.285 29.285 29.285 29.285 29.285 29.285 29.285 29.285
20,9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 36.582 36.582 36.582 36.582 36.582 36.582 36.582 36.582 36.582
20,10 VÁLVULA DE BOLA GAS 1/2" UN 18.750 18.750 18.750 18.750 18.750 18.750 18.750 18.750 18.750
20,11 VÁLVULA DE BOLA GAS 3/4" UN 24.512 24.512 24.512 24.512 24.512 24.512 24.512 24.512 24.512
20,12 VÁLVULA DE BOLA GAS 1" UN 37.559 37.559 37.559 37.559 37.559 37.559 37.559 37.559 37.559
20,13 VÁLVULA POLIETILENO GAS 1/2" UN 285.939 285.939 285.939 285.939 285.939 285.939 285.939 285.939 285.939
20,14 VÁLVULA POLIETILENO GAS 3/4" UN 328.973 328.973 328.973 328.973 328.973 328.973 328.973 328.973 328.973
20,15 VÁLVULA POLIETILENO GAS 1" UN 343.297 343.297 343.297 343.297 343.297 343.297 343.297 343.297 343.297
20,16 ACOMETIDA GAS 1/2" ML 319.665 319.665 319.665 319.665 319.665 319.665 319.665 319.665 319.665

21,1 INSTALACIONES RED VOZ Y DATOS


21,1 SENSOR DE HUMO FOTOELÉCTRICO UN 233.610 233.610 233.610 233.610 233.610 233.610 233.610 233.610 233.610
21,2 CABLE DETECTOR LINEAL DE CALOR ML 35.600 35.600 35.600 35.600 35.600 35.600 35.600 35.600 35.600
21,3 SIRENA DE 110 V UN 109.725 109.725 109.725 109.725 109.725 109.725 109.725 109.725 109.725
21,4 CÁMARA CCTV UN 283.874 283.874 283.874 283.874 283.874 283.874 283.874 283.874 283.874
21,5 PARLANTE-CIELO FALSO UN 55.870 55.870 55.870 55.870 55.870 55.870 55.870 55.870 55.870
21,6 AMPLIFICADOR 100W UN 606.833 606.833 606.833 606.833 606.833 606.833 606.833 606.833 606.833
21,7 AMPLIFICADOR 300W UN 1.493.116 1.493.116 1.493.116 1.493.116 1.493.116 1.493.116 1.493.116 1.493.116 1.493.116
21,8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 50.247 50.247 50.247 50.247 50.247 50.247 50.247 50.247 50.247
21,9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 232.985 232.985 232.985 232.985 232.985 232.985 232.985 232.985 232.985
21,10 TOMA PARA MICRÓFONO UN 47.689 47.689 47.689 47.689 47.689 47.689 47.689 47.689 47.689
21,11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 4.008 4.008 4.008 4.008 4.008 4.008 4.008 4.008 4.008
21,12 SPLITERS UN 6.651 6.651 6.651 6.651 6.651 6.651 6.651 6.651 6.651
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
21,13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML CONSTRUCCIÓN
20.587 20.587 20.587 20.587 20.587 20.587 20.587 20.587 20.587
21,14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 26.828 26.828 26.828 26.828 26.828 26.828 26.828 26.828 26.828
21,15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 34.775 34.775 34.775 34.775 34.775 34.775 34.775 34.775 34.775
21,16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 129.720 129.720 129.720 129.720 129.720 129.720 129.720 129.720 129.720
21,17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 33.874 33.874 33.874 33.874 33.874 33.874 33.874 33.874 33.874
21,18 BANDEJA PORTACABLES PARA RACK UN 110.177 110.177 110.177 110.177 110.177 110.177 110.177 110.177 110.177
21,19 RACK 2' X 24" UN 199.557 199.557 199.557 199.557 199.557 199.557 199.557 199.557 199.557
21,20 RACK 3' X 24" UN 309.182 309.182 309.182 309.182 309.182 309.182 309.182 309.182 309.182
21,21 RACK 5' X 24" UN 386.064 386.064 386.064 386.064 386.064 386.064 386.064 386.064 386.064
21,22 RACK 7' X 24" UN 420.756 420.756 420.756 420.756 420.756 420.756 420.756 420.756 420.756
21,23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 622.400 622.400 622.400 622.400 622.400 622.400 622.400 622.400 622.400
21,24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 368.447 368.447 368.447 368.447 368.447 368.447 368.447 368.447 368.447
21,25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 110.006 110.006 110.006 110.006 110.006 110.006 110.006 110.006 110.006
21,26 PATCH CORD 2M CATEGORÍA 6A UN 14.556 14.556 14.556 14.556 14.556 14.556 14.556 14.556 14.556
21,27 PATCH CORD 5M CATEGORÍA 6A UN 29.681 29.681 29.681 29.681 29.681 29.681 29.681 29.681 29.681
21,28 CABLE UTP CATEGORÍA 6A ML 5.379 5.379 5.379 5.379 5.379 5.379 5.379 5.379 5.379
21,29 CANALETA METÁLICA 4X6 CMS ML 38.177 38.177 38.177 38.177 38.177 38.177 38.177 38.177 38.177
21,30 CANALETA METÁLICA 4X10 CMS ML 39.831 39.831 39.831 39.831 39.831 39.831 39.831 39.831 39.831
21,31 CANALETA METÁLICA 6X10 CMS ML 40.657 40.657 40.657 40.657 40.657 40.657 40.657 40.657 40.657
21,32 CANALETA PLÁSTICA 13X7 MM ML 26.556 26.556 26.556 26.556 26.556 26.556 26.556 26.556 26.556
21,33 CANALETA PLÁSTICA 20X12 MM ML 29.275 29.275 29.275 29.275 29.275 29.275 29.275 29.275 29.275
21,34 CANALETA PLÁSTICA 32X12 MM ML 30.418 30.418 30.418 30.418 30.418 30.418 30.418 30.418 30.418
21,35 CANALETA PLÁSTICA 40X60 MM ML 50.506 50.506 50.506 50.506 50.506 50.506 50.506 50.506 50.506
21,36 SWITCH 10/100/1000 24 PUERTOS UN 649.157 649.157 649.157 649.157 649.157 649.157 649.157 649.157 649.157
21,37 SWITCH 10/100/1000 16 PUERTOS UN 335.266 335.266 335.266 335.266 335.266 335.266 335.266 335.266 335.266
21,38 SWITCH 10/100/1000 8 PUERTOS UN 96.310 96.310 96.310 96.310 96.310 96.310 96.310 96.310 96.310
21,39 CABLE TELEFÓNICO 2 PARES ML 1.984 1.984 1.984 1.984 1.984 1.984 1.984 1.984 1.984
21,40 CABLE TELEFÓNICO 10 PARES ML 9.130 9.130 9.130 9.130 9.130 9.130 9.130 9.130 9.130
21,41 CABLE TELEFÓNICO 20 PARES ML 13.496 13.496 13.496 13.496 13.496 13.496 13.496 13.496 13.496
21,42 CABLE TELEFÓNICO 40 PARES ML 22.428 22.428 22.428 22.428 22.428 22.428 22.428 22.428 22.428
21,43 CABLE TELEVISIÓN RG6 ML 4.201 4.201 4.201 4.201 4.201 4.201 4.201 4.201 4.201
21,44 ACOMETIDA TELEFÓNICA 1/2" ML 24.830 24.830 24.830 24.830 24.830 24.830 24.830 24.830 24.830
21,45 ACOMETIDA TELEFÓNICA 1" ML 35.809 35.809 35.809 35.809 35.809 35.809 35.809 35.809 35.809
21,46 ACOMETIDA TELEVISIÓN 1" RG6" ML 21.132 21.132 21.132 21.132 21.132 21.132 21.132 21.132 21.132
21,47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 16.522 16.522 16.522 16.522 16.522 16.522 16.522 16.522 16.522
21,48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 650.656 650.656 650.656 650.656 650.656 650.656 650.656 650.656 650.656
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
CONSTRUCCIÓN
URBANISMO
1 ACUEDUCTO
1,1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 28.705 28.705 28.705 28.705 28.705 28.705 28.705 28.705 28.705
1,2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 95.379 95.379 95.379 95.379 95.379 95.379 95.379 95.379 95.379
1,3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 534.765 534.765 534.765 534.765 534.765 534.765 534.765 534.765 534.765
1,4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 1.141.221 1.141.221 1.141.221 1.141.221 1.141.221 1.141.221 1.141.221 1.141.221 1.141.221
1,5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 131.185 131.185 131.185 131.185 131.185 131.185 131.185 131.185 131.185
1,6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 796.399 796.399 796.399 796.399 796.399 796.399 796.399 796.399 796.399
1,7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1.712.398 1.712.398 1.712.398 1.712.398 1.712.398 1.712.398 1.712.398 1.712.398 1.712.398
1,8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 14.177 14.177 14.177 14.177 14.177 14.177 14.177 14.177 14.177
1,9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 17.365 17.365 17.365 17.365 17.365 17.365 17.365 17.365 17.365
1,10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 21.671 21.671 21.671 21.671 21.671 21.671 21.671 21.671 21.671
1,11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 23.669 23.669 23.669 23.669 23.669 23.669 23.669 23.669 23.669
1,12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 28.272 28.272 28.272 28.272 28.272 28.272 28.272 28.272 28.272
1,13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 28.272 28.272 28.272 28.272 28.272 28.272 28.272 28.272 28.272
1,14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 111.950 111.950 111.950 111.950 111.950 111.950 111.950 111.950 111.950
1,15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 129.741 129.741 129.741 129.741 129.741 129.741 129.741 129.741 129.741
1,16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 401.195 401.195 401.195 401.195 401.195 401.195 401.195 401.195 401.195
1,17 TEE PVC UNIÓN MECÁNICA 2" UN 150.555 150.555 150.555 150.555 150.555 150.555 150.555 150.555 150.555
1,18 TEE PVC UNIÓN MECÁNICA 4" UN 248.195 248.195 248.195 248.195 248.195 248.195 248.195 248.195 248.195
1,19 TEE PVC UNIÓN MECÁNICA 8" UN 1.096.687 1.096.687 1.096.687 1.096.687 1.096.687 1.096.687 1.096.687 1.096.687 1.096.687
1,20 TEE PVC UNIÓN MECÁNICA 10" UN 1.263.344 1.263.344 1.263.344 1.263.344 1.263.344 1.263.344 1.263.344 1.263.344 1.263.344
1,21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 15.203 15.203 15.203 15.203 15.203 15.203 15.203 15.203 15.203
1,22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 13.462 13.462 13.462 13.462 13.462 13.462 13.462 13.462 13.462
1,23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 32.316 32.316 32.316 32.316 32.316 32.316 32.316 32.316 32.316
1,24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 129.326 129.326 129.326 129.326 129.326 129.326 129.326 129.326 129.326
1,25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 191.934 191.934 191.934 191.934 191.934 191.934 191.934 191.934 191.934
1,26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 31.682 31.682 31.682 31.682 31.682 31.682 31.682 31.682 31.682
1,27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 108.633 108.633 108.633 108.633 108.633 108.633 108.633 108.633 108.633
1,28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 160.337 160.337 160.337 160.337 160.337 160.337 160.337 160.337 160.337
1,29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 31.881 31.881 31.881 31.881 31.881 31.881 31.881 31.881 31.881
1,30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 65.579 65.579 65.579 65.579 65.579 65.579 65.579 65.579 65.579
1,31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 262.776 262.776 262.776 262.776 262.776 262.776 262.776 262.776 262.776
1,32 UNIÓN REPARACION PVC 4" UN 76.403 76.403 76.403 76.403 76.403 76.403 76.403 76.403 76.403
1,33 UNIÓN REPARACIÓN PVC 8" UN 305.516 305.516 305.516 305.516 305.516 305.516 305.516 305.516 305.516
1,34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 184.767 184.767 184.767 184.767 184.767 184.767 184.767 184.767 184.767
1,35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 521.463 521.463 521.463 521.463 521.463 521.463 521.463 521.463 521.463
1,36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1.391.198 1.391.198 1.391.198 1.391.198 1.391.198 1.391.198 1.391.198 1.391.198 1.391.198
1,37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 2.055.402 2.055.402 2.055.402 2.055.402 2.055.402 2.055.402 2.055.402 2.055.402 2.055.402

2 ALCANTARILLADO - EXCAVACIONES
2,1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835
2,2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 27.144 27.144 27.144 27.144 27.144 27.144 27.144 27.144 27.144
2,3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 20.944 20.944 20.944 20.944 20.944 20.944 20.944 20.944 20.944
2,4 RELLENO TIPO 1 "GRAVILLA" M3 70.080 73.938 65.672 75.590 70.631 71.734 73.386 72.285 63.468
2,5 RELLENO TIPO 2 "RECEBO" M3 72.627 76.249 72.627 72.627 76.249 81.681 63.572 72.627 72.627
2,6 RELLENO TIPO 4 "SUBBASE B-200" M3 70.097 76.249 72.627 72.627 76.249 81.681 63.572 67.194 72.627
2,7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 53.655 65.677 54.680 60.829 63.904 60.829 53.655 59.805 79.212
2,8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 60.844 69.202 56.665 62.934 66.068 62.934 55.620 61.889 54.576
2,9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 53.339 55.450 50.926 56.355 53.640 54.244 55.148 54.545 49.720

3 ALCANTARILLADO - TUBERÍA
3,1 CODO 45 PVC ALCANTARILLADO 8" UN 119.646 119.646 119.646 119.646 119.646 119.646 119.646 119.646 119.646
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
3,2 CODO 45 PVC ALCANTARILLADO 16" UN CONSTRUCCIÓN
1.243.891 1.243.891 1.243.891 1.243.891 1.243.891 1.243.891 1.243.891 1.243.891 1.243.891
3,3 CODO 90 PVC ALCANTARILLADO 8" UN 156.237 156.237 156.237 156.237 156.237 156.237 156.237 156.237 156.237
3,4 CODO 90 PVC ALCANTARILLADO 16" UN 1.440.660 1.440.660 1.440.660 1.440.660 1.440.660 1.440.660 1.440.660 1.440.660 1.440.660
3,5 CODO 90 PVC ALCANTARILLADO 24" UN 1.004.414 1.004.414 1.004.414 1.004.414 1.004.414 1.004.414 1.004.414 1.004.414 1.004.414
3,6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 63.667 63.667 63.667 63.667 63.667 63.667 63.667 63.667 63.667
3,7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 118.773 118.773 118.773 118.773 118.773 118.773 118.773 118.773 118.773
3,8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 280.060 280.060 280.060 280.060 280.060 280.060 280.060 280.060 280.060
3,9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 280.053 280.053 280.053 280.053 280.053 280.053 280.053 280.053 280.053
3,10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 449.434 449.434 449.434 449.434 449.434 449.434 449.434 449.434 449.434
3,11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 118.823 118.823 118.823 118.823 118.823 118.823 118.823 118.823 118.823
3,12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 118.823 118.823 118.823 118.823 118.823 118.823 118.823 118.823 118.823
3,13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 280.060 280.060 280.060 280.060 280.060 280.060 280.060 280.060 280.060
3,14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 280.060 280.060 280.060 280.060 280.060 280.060 280.060 280.060 280.060
3,15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 449.434 449.434 449.434 449.434 449.434 449.434 449.434 449.434 449.434
3,16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 452.700 452.700 452.700 452.700 452.700 452.700 452.700 452.700 452.700
3,17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 733.783 733.783 733.783 733.783 733.783 733.783 733.783 733.783 733.783
3,18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 1.177.316 1.177.316 1.177.316 1.177.316 1.177.316 1.177.316 1.177.316 1.177.316 1.177.316
3,19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 72.984 72.984 72.984 72.984 72.984 72.984 72.984 72.984 72.984
3,20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 379.155 379.155 379.155 379.155 379.155 379.155 379.155 379.155 379.155
3,21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 424.098 424.098 424.098 424.098 424.098 424.098 424.098 424.098 424.098
3,22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 1.172.740 1.172.740 1.172.740 1.172.740 1.172.740 1.172.740 1.172.740 1.172.740 1.172.740
3,23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 68.470 68.492 68.446 68.502 68.474 68.480 68.489 68.483 68.433
3,24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 343.911 343.911 343.911 343.911 343.911 343.911 343.911 343.911 343.911
3,25 TUBERÍA PVC ALCANTARILLADO 8" ML 52.404 52.404 52.404 52.404 52.404 52.404 52.404 52.404 52.404
3,26 TUBERÍA PVC ALCANTARILLADO 10" ML 73.964 73.964 73.964 73.964 73.964 73.964 73.964 73.964 73.964
3,27 TUBERÍA PVC ALCANTARILLADO 12" ML 106.569 106.569 106.569 106.569 106.569 106.569 106.569 106.569 106.569
3,28 TUBERÍA PVC ALCANTARILLADO 16" ML 163.507 163.507 163.507 163.507 163.507 163.507 163.507 163.507 163.507
3,29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 262.462 262.462 262.462 262.462 262.462 262.462 262.462 262.462 262.462
3,30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 381.380 381.380 381.380 381.380 381.380 381.380 381.380 381.380 381.380
3,31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 482.407 482.407 482.407 482.407 482.407 482.407 482.407 482.407 482.407
3,32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 634.227 634.227 634.227 634.227 634.227 634.227 634.227 634.227 634.227
3,33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 871.699 871.699 871.699 871.699 871.699 871.699 871.699 871.699 871.699

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4,1 UN 693.657 696.550 690.351 697.790 694.071 694.897 696.137 695.310 688.699
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE
4,2 ML 665.539 666.573 664.357 667.017 665.687 665.982 666.426 666.130 663.766
INTERNO E=1.5CM Y CAÑUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,3 UN 742.955 744.884 740.751 745.711 743.231 743.782 744.609 744.057 739.650
(INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4,4 UN 820.504 824.120 816.371 825.670 821.020 822.053 823.603 822.570 814.306
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE
4,5 ML 940.009 941.466 938.344 942.090 940.217 940.633 941.258 940.841 937.512
INTERNO E=1.5CM Y CAÑUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4,6 UN 853.593 856.245 850.563 857.382 853.972 854.730 855.866 855.109 849.048
(INCLUYE ARO Y TAPA HF)
4,7 SUMIDERO EN LADRILLO SL-100 UN 1.070.245 1.071.318 1.069.015 1.071.781 1.070.398 1.070.703 1.071.166 1.070.860 1.068.400
4,8 SUMIDERO EN LADRILLO SL-250 UN 1.530.555 1.534.092 1.526.505 1.535.612 1.531.059 1.532.068 1.533.588 1.532.579 1.524.481
4,9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 2.060.071 2.067.766 2.051.276 2.071.063 2.061.172 2.063.368 2.066.665 2.064.467 2.046.882
4,10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.717.920 2.730.712 2.703.301 2.736.193 2.719.750 2.723.401 2.728.882 2.725.228 2.695.996
4,11 SUMIDERO PREFABRICADO SL-100 UN 1.925.810 1.925.810 1.925.810 1.925.810 1.925.810 1.925.810 1.925.810 1.925.810 1.925.810
4,12 SUMIDERO PREFABRICADO SL-250 UN 4.057.264 4.057.264 4.057.264 4.057.264 4.057.264 4.057.264 4.057.264 4.057.264 4.057.264
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4,13 UN 148.517 148.559 148.468 148.577 148.523 148.535 148.553 148.541 148.444
H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
5,1 ADOQUÍN DE ARCILLA 20X10X6CM M2 CONSTRUCCIÓN
75.395 75.508 75.265 75.557 75.411 75.443 75.492 75.460 75.200
5,2 ADOQUÍN DE ARCILLA 20X10X8CM M2 89.435 89.548 89.305 89.597 89.451 89.483 89.532 89.500 89.240
5,3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 56.340 56.863 55.743 57.087 56.415 56.564 56.788 56.639 55.444
5,4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 61.222 61.728 60.643 61.945 61.294 61.439 61.656 61.511 60.354
5,5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 61.512 62.004 60.949 62.215 61.582 61.723 61.934 61.793 60.668
5,6 BORDE SEPARADOR VERDE A-170 ML 263.540 263.582 263.492 263.601 263.546 263.558 263.576 263.564 263.468
5,7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 19.834 19.897 19.763 19.924 19.843 19.861 19.888 19.870 19.727
5,8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 40.468 40.836 40.047 40.994 40.521 40.626 40.784 40.679 39.837
5,9 CAÑUELA PREFABRICADA TIPO A-120 ML 87.733 87.756 87.707 87.765 87.736 87.743 87.752 87.746 87.694
5,10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 582.990 583.759 582.112 584.088 583.100 583.320 583.649 583.429 581.673
5,11 LOSETA PREFABRICADA A-40 M2 64.236 64.332 64.125 64.374 64.250 64.277 64.319 64.291 64.070
5,12 LOSETA PREFABRICADA A-60 M2 92.997 93.094 92.887 93.135 93.011 93.038 93.080 93.052 92.831
5,13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 34.563 34.766 34.332 34.852 34.592 34.650 34.737 34.679 34.216
5,14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 54.685 55.095 54.217 55.270 54.743 54.860 55.036 54.919 53.982
5,15 SARDINEL PREFABRICADO A-10 ML 98.064 97.887 101.222 100.683 103.440 99.068 98.282 99.271 103.796
5,16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 62.584 62.642 62.517 62.667 62.592 62.609 62.634 62.617 62.484

6 MOBILIARIO URBANO
6,1 BANCA EN CONCRETO M-40 UN 211.851 212.092 211.575 212.195 211.885 211.954 212.057 211.988 211.438
6,2 BANCA EN CONCRETO M-30 UN 693.543 693.880 693.157 694.025 693.591 693.687 693.832 693.735 692.964
6,3 BOLARDO M-63 ALTO/HIERRO UN 225.732 225.783 225.674 225.805 225.740 225.754 225.776 225.761 225.645
6,4 BOLARDO M-60 CONCRETO UN 169.552 169.842 169.222 169.966 169.594 169.676 169.800 169.718 169.056
6,5 BOLARDO M-61 BAJO/CONCRETO UN 171.651 171.940 171.320 172.064 171.692 171.775 171.899 171.816 171.155
6,6 BOLARDO M-62 BAJO/HIERRO UN 200.657 200.962 200.310 201.092 200.701 200.788 200.918 200.831 200.136
6,7 BORDE CONTENEDOR DE RAICES A-70 ML 61.472 61.559 61.372 61.596 61.484 61.509 61.547 61.522 61.323
6,8 BORDILLO PREFABRICADO A-80 ML 69.358 69.455 69.247 69.497 69.372 69.400 69.442 69.414 69.191
6,9 CANECA M-120 UN 324.678 324.700 324.653 324.709 324.681 324.688 324.697 324.691 324.641
6,10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 857.571 857.716 857.406 857.778 857.592 857.633 857.695 857.654 857.323
6,11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.504.725 3.504.821 3.504.615 3.504.863 3.504.739 3.504.766 3.504.808 3.504.780 3.504.560
6,12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 3.605.169 3.605.265 3.605.059 3.605.307 3.605.183 3.605.210 3.605.252 3.605.224 3.605.004
6,13 CICLOPARQUEADERO M100 TIPO 1 UN 504.387 504.488 504.271 504.532 504.401 504.430 504.474 504.445 504.213
6,14 CICLOPARQUEADERO M101 TIPO 2 UN 666.517 666.922 666.053 667.096 666.575 666.690 666.864 666.748 665.822
6,15 BANCA EN MADERA M-50 UN 556.603 556.603 556.603 556.603 556.603 556.603 556.603 556.603 556.603
6,16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 260.374 260.519 260.209 260.581 260.395 260.436 260.498 260.457 260.127
6,17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 596.775 596.829 596.712 596.852 596.782 596.798 596.821 596.806 596.681
6,18 POSTE HISTÓRICO M-131 UN 6.655.318 6.656.042 6.654.492 6.656.351 6.655.422 6.655.628 6.655.938 6.655.732 6.654.079

7 SEÑALIZACIÓN
7,1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 4.185 4.185 4.185 4.185 4.185 4.185 4.185 4.185 4.185
7,2 MARCA VIAL CON PINTURA EN FRÍO M2 45.467 45.467 45.467 45.467 45.467 45.467 45.467 45.467 45.467
7,3 SEÑAL DOBLE DE CICLORUTA UN 326.682 326.704 326.658 326.713 326.685 326.691 326.701 326.695 326.646
7,4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 513.870 514.072 513.638 514.159 513.899 513.957 514.043 513.985 513.522
7,5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 245.769 245.790 245.744 245.799 245.772 245.778 245.787 245.781 245.732
7,6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 260.839 260.860 260.814 260.869 260.842 260.848 260.857 260.851 260.802
7,7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 272.251 272.272 272.226 272.281 272.254 272.260 272.269 272.263 272.214
7,8 TACHAS REFLECTIVAS UN 14.140 14.140 14.140 14.140 14.140 14.140 14.140 14.140 14.140
7,9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 15.089 15.089 15.089 15.089 15.089 15.089 15.089 15.089 15.089
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7,10 UN 122.534 122.534 122.534 122.534 122.534 122.534 122.534 122.534 122.534
SUMINISTRO E INSTALACIÓN)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
CONSTRUCCIÓN
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1,1 201 P M3 163.004 163.004 163.004 163.004 163.004 163.004 163.004 163.004 163.004
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES
1,2 201 P M3 57.239 57.239 57.239 57.239 57.239 57.239 57.239 57.239 57.239
A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1,3 200.1 HA 2.781.770 2.781.770 2.781.770 2.781.770 2.781.770 2.781.770 2.781.770 2.781.770 2.781.770
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1,4 200.2 HA 1.007.734 1.007.734 1.007.734 1.007.734 1.007.734 1.007.734 1.007.734 1.007.734 1.007.734
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1,5 201.7 M3 95.420 95.420 95.420 95.420 95.420 95.420 95.420 95.420 95.420
UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1,6 *** M3-KM 1.393 1.393 1.393 1.393 1.393 1.393 1.393 1.393 1.393
SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2,1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 10.141 10.141 10.141 10.141 10.141 10.141 10.141 10.141 10.141
2,2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 36.674 36.674 36.674 36.674 36.674 36.674 36.674 36.674 36.674
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2,3 210.2.2 M3 9.296 9.296 9.296 9.296 9.296 9.296 9.296 9.296 9.296
PRÉSTAMOS
2,4 220.1 TERRAPLENES M3 15.828 15.828 15.828 15.828 15.828 15.828 15.828 15.828 15.828
2,5 221.1 PEDRAPLÉN COMPACTO M3 13.840 13.840 13.840 13.840 13.840 13.840 13.840 13.840 13.840
2,6 221.2 PEDRAPLÉN SUELTO M3 7.955 7.955 7.955 7.955 7.955 7.955 7.955 7.955 7.955
2,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 510 510 510 510 510 510 510 510 510
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2,8 230.2 M3 13.601 13.601 13.601 13.601 13.601 13.601 13.601 13.601 13.601
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
2,9 600.1 M3 22.199 22.199 22.199 22.199 22.199 22.199 22.199 22.199 22.199
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A
2,10 600.2 M3 67.955 67.955 67.955 67.955 67.955 67.955 67.955 67.955 67.955
UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES
2,11 600.3 M3 83.575 83.575 83.575 83.575 83.575 83.575 83.575 83.575 83.575
A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE
2,12 600.4 M3 20.181 20.181 20.181 20.181 20.181 20.181 20.181 20.181 20.181
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE
2,13 600.4 P M3 43.705 43.705 43.705 43.705 43.705 43.705 43.705 43.705 43.705
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO
2,14 600.5 M3 33.128 33.128 33.128 33.128 33.128 33.128 33.128 33.128 33.128
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE
2,15 600.5 P M3 59.178 59.178 59.178 59.178 59.178 59.178 59.178 59.178 59.178
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3,1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 5.763 5.763 5.763 5.763 5.763 5.763 5.763 5.763 5.763
3,2 320.1 SUBBASE GRANULAR M3 110.543 108.732 139.517 134.085 159.437 119.598 112.354 121.408 128.652
3,3 330.1 BASE GRANULAR M3 115.748 113.937 144.722 139.290 164.642 124.802 117.559 126.613 168.264
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3,4 365.1 M3 147.793 147.793 147.793 147.793 147.793 147.793 147.793 147.793 147.793
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
3,5 420.1 RIEGO DE IMPRIMACIÓN M2 3.345 3.345 3.345 3.345 3.345 3.345 3.345 3.345 3.345
3,6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1.174 1.174 1.174 1.174 1.174 1.174 1.174 1.174 1.174
3,7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 229.139 230.181 227.949 230.627 229.288 229.586 230.032 229.735 227.354
3,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 66.360 66.532 66.163 66.606 66.385 66.434 66.508 66.459 66.064
3,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 559.408 573.338 561.149 580.303 573.338 562.891 562.891 562.891 562.891
3,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 565.858 579.788 567.599 586.753 579.788 569.341 569.341 569.341 569.341
3,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 606.448 620.378 608.189 627.343 620.378 609.930 609.930 609.930 609.930
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
3,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 CONSTRUCCIÓN
572.309 586.239 574.051 593.204 586.239 575.792 575.792 575.792 575.792
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 389.396 381.365 400.761 374.895 374.287 392.346 375.279 379.592 396.435
3,13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 268.416 266.605 297.391 291.958 317.311 277.471 270.227 279.282 320.932
3,14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 262.166 260.356 291.141 285.708 311.061 271.221 263.977 273.032 280.275
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 45.190 45.190 45.190 45.190 45.190 45.190 45.190 45.190 45.190
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 177.399 177.399 177.399 177.399 177.399 177.399 177.399 177.399 177.399
3,15 311.1 AFIRMADO M3 64.039 70.190 66.568 66.568 70.190 75.623 57.514 61.136 66.568
3,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11.831 11.905 11.747 11.936 11.842 11.863 11.894 11.873 11.705
3,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4.714 4.750 4.672 4.766 4.719 4.729 4.745 4.735 4.651
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3,18 500.1 M3 643.083 647.715 637.790 649.700 643.745 645.068 647.053 645.730 635.144
ACERO DE TRANSFERENCIA Y UNIÓN
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y
3,19 500.1 M3 674.911 679.750 669.381 681.824 675.603 676.985 679.059 677.676 666.616
ACERO DE TRANSFERENCIA Y UNIÓN
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y
3,20 500.1 M3 696.140 701.118 690.450 703.252 696.851 698.273 700.407 698.985 687.606
ACERO DE TRANSFERENCIA Y UNIÓN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
3,21 *** ML 7.653 7.653 7.653 7.653 7.653 7.653 7.653 7.653 7.653
LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
3,22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 94.286 106.544 88.157 97.350 101.947 97.350 86.624 95.818 85.092

4 NORMA INV OBRAS DE ARTE


4,1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 940.224 945.478 934.219 947.729 940.975 942.475 944.727 943.226 931.218
4,2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 801.269 806.436 795.363 808.650 802.007 803.482 805.697 804.221 792.412
4,3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 850.825 856.197 844.686 858.498 851.593 853.127 855.429 853.894 841.618
4,4 630 P CONCRETOS f´c =3500 psi (bases) M3 570.716 575.454 565.302 577.484 571.394 572.746 574.776 573.423 562.596
4,5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 675.113 680.039 669.484 682.149 675.818 677.223 679.334 677.927 666.671
4,6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 567.926 572.796 562.360 574.882 568.621 570.012 572.100 570.708 559.579
4,7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 672.212 677.275 666.426 679.444 672.935 674.381 676.551 675.105 663.535
4,8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 740.703 745.573 735.138 747.660 741.399 742.790 744.877 743.485 732.356
4,9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 587.235 592.298 581.449 594.467 587.958 589.404 591.574 590.128 578.558
4,10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 787.861 792.924 782.075 795.093 788.584 790.030 792.200 790.754 779.184
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4,11 650 P KG 12.753 12.753 12.753 12.753 12.753 12.753 12.753 12.753 12.753
ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4,12 650 P KG 16.232 16.232 16.232 16.232 16.232 16.232 16.232 16.232 16.232
ACERO A-588 GRADO B
4,13 641.1 ACERO DE PREESFUERZO TON-M 1.907 1.907 1.907 1.907 1.907 1.907 1.907 1.907 1.907
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO
4,14 621.1 ML 2.810.243 2.810.243 2.810.243 2.810.243 2.810.243 2.810.243 2.810.243 2.810.243 2.810.243
TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN
4,15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML 4.375.729 4.384.716 4.365.458 4.388.567 4.377.014 4.379.580 4.383.432 4.380.864 4.360.324
REFUERZO Y ANILLOS)

4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.800.400 1.805.222 1.794.890 1.807.288 1.801.089 1.802.466 1.804.533 1.803.155 1.792.136

4,17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 91.505 91.505 91.505 91.505 91.505 91.505 91.505 91.505 91.505
4,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 378.926 379.505 378.265 379.753 379.009 379.174 379.422 379.257 377.934
4,19 632 P BARANDA METÁLICA ML 449.351 449.351 449.351 449.351 449.351 449.351 449.351 449.351 449.351
4,20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 17.851 17.851 17.851 17.851 17.851 17.851 17.851 17.851 17.851
4,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 465.103 474.015 460.800 473.983 469.621 474.429 465.482 466.246 457.872
4,22 673.1 MATERIAL GRANULAR FILTRANTE M3 68.572 80.973 70.105 79.298 83.895 79.298 68.572 77.766 95.428
4,23 610.1 RELLENO PARA ESTRUCTURAS M3 77.912 81.255 77.912 77.912 81.255 86.270 69.554 77.912 77.912
4,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 365.222 370.340 359.373 372.534 365.954 367.415 369.609 368.146 356.449
4,25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 366.685 374.183 360.981 372.143 369.905 369.102 366.505 368.979 358.130
4,26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 375.430 382.928 369.726 380.888 378.651 377.847 375.250 377.724 366.875
4,27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 381.869 389.312 376.226 387.249 385.081 384.263 381.642 384.132 373.406
4,28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 390.614 398.058 384.972 395.994 393.826 393.008 390.387 392.877 382.151
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
4,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 CONSTRUCCIÓN
515.105 520.132 509.359 522.286 515.823 517.259 519.413 517.977 506.487
4,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 617.531 622.757 611.558 624.997 618.278 619.771 622.011 620.518 608.573
4,31 681.1 GAVIÓN M3 189.142 200.843 183.291 192.067 196.455 192.067 181.829 190.605 180.366
4,32 681.1 GAVIÓN MALLA PVC M3 193.443 205.145 187.593 196.369 200.757 196.369 186.130 194.906 184.667
4,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 43.431 43.739 43.078 43.871 43.475 43.563 43.695 43.607 42.902
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500
4,34 672.1 ML 16.225 16.379 16.048 16.445 16.247 16.291 16.357 16.313 15.960
PSI
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
4,35 *** M2 10.669 10.669 10.669 10.669 10.669 10.669 10.669 10.669 10.669
(RESISTENCIA ÚLTIMA 25 KN)
4,36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 15.109 15.109 15.109 15.109 15.109 15.109 15.109 15.109 15.109

4,37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 20.252 20.252 20.252 20.252 20.252 20.252 20.252 20.252 20.252
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4,38 *** M2 24.229 24.229 24.229 24.229 24.229 24.229 24.229 24.229 24.229
(RESISTENCIA ÚLTIMA 100 KN)
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4,39 *** M2 31.066 31.066 31.066 31.066 31.066 31.066 31.066 31.066 31.066
(RESISTENCIA ÚLTIMA 165 KN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,
4,40 *** M2 7.656 7.656 7.656 7.656 7.656 7.656 7.656 7.656 7.656
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,
4,41 *** M2 8.700 8.700 8.700 8.700 8.700 8.700 8.700 8.700 8.700
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN,
4,42 *** M2 9.037 9.037 9.037 9.037 9.037 9.037 9.037 9.037 9.037
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,
4,43 *** M2 6.487 6.487 6.487 6.487 6.487 6.487 6.487 6.487 6.487
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,
4,44 *** M2 9.683 9.683 9.683 9.683 9.683 9.683 9.683 9.683 9.683
FILTRO Y SEPARACIÓN)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2020)
PROVINCIA: SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá

4,45 ***
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,
M2
CONSTRUCCIÓN
7.928 7.928 7.928 7.928 7.928 7.928 7.928 7.928 7.928
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN,
4,46 *** M2 9.683 9.683 9.683 9.683 9.683 9.683 9.683 9.683 9.683
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN,
4,47 *** M2 18.446 18.446 18.446 18.446 18.446 18.446 18.446 18.446 18.446
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36"
4,48 661.1 ML 657.375 657.446 657.294 657.476 657.385 657.405 657.436 657.416 657.253
CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600
4,49 660.3 ML 367.334 368.389 366.127 368.842 367.484 367.786 368.238 367.937 365.524
MM
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO
4,50 *** ML 917.879 917.879 917.879 917.879 917.879 917.879 917.879 917.879 917.879
36"
4,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 138.067 143.982 140.499 140.499 143.982 149.206 131.793 135.276 140.499
4,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.631 4.631 4.631 4.631 4.631 4.631 4.631 4.631 4.631
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4,53 *** ML 89.178 89.178 89.178 89.178 89.178 89.178 89.178 89.178 89.178
INSTALACIÓN)
GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4,54 *** ML 135.803 135.803 135.803 135.803 135.803 135.803 135.803 135.803 135.803
INSTALACIÓN)
4,55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 516.749 521.975 510.775 524.214 517.495 518.989 521.228 519.735 507.790
4,56 682.1 P COLCHONETA RENO M3 206.646 218.347 200.796 209.571 213.959 209.571 199.333 208.109 197.870
4,57 *** TRINCHO EN MADERA M2 70.725 70.725 70.725 70.725 70.725 70.725 70.725 70.725 70.725

5 NORMA INV SEÑALIZACIÓN


5,1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 4.185 4.185 4.185 4.185 4.185 4.185 4.185 4.185 4.185
5,2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 45.467 45.467 45.467 45.467 45.467 45.467 45.467 45.467 45.467
5,3 730.3 TOPE DEFENSA METÁLICA UN 87.037 87.037 87.037 87.037 87.037 87.037 87.037 87.037 87.037
5,4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 72.495 72.495 72.495 72.495 72.495 72.495 72.495 72.495 72.495
5,5 730.1 DEFENSA METÁLICA ML 152.880 153.133 152.592 153.241 152.917 152.989 153.097 153.025 152.448
5,6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 14.140 14.140 14.140 14.140 14.140 14.140 14.140 14.140 14.140

6 NORMA INV MANTENIMIENTO VIAL


6,1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 887 887 887 887 887 887 887 887 887
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36",
6,2 801.6 INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN 148.188 148.188 148.188 148.188 148.188 148.188 148.188 148.188 148.188
DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE
6,3 801.7 ML 28.660 28.660 28.660 28.660 28.660 28.660 28.660 28.660 28.660
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
6,4 211.1 REMOCIÓN DE DERRUMBES M3 8.833 8.833 8.833 8.833 8.833 8.833 8.833 8.833 8.833
6,5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 499.759 499.759 499.759 499.759 499.759 499.759 499.759 499.759 499.759
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6,6 801.4 M2 1.917 1.917 1.917 1.917 1.917 1.917 1.917 1.917 1.917
SOBRANTES A UNA DISTANCIA DE 5 KM)
6,7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 16.289 16.289 16.289 16.289 16.289 16.289 16.289 16.289 16.289
6,8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 26.160 26.160 26.160 26.160 26.160 26.160 26.160 26.160 26.160
6,9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 10.693 10.693 10.693 10.693 10.693 10.693 10.693 10.693 10.693
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.