Documentos de Académico
Documentos de Profesional
Documentos de Cultura
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 124,238 124,966 123,407 125,278 124,342 124,550
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 131,044 131,817 130,160 132,148 131,154 131,375
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 149,659 150,614 148,567 151,023 149,795 150,068
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 166,252 167,344 165,005 167,811 166,408 166,720
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 184,410 185,638 183,007 186,164 184,586 184,936
4.12 ENTREPISO VIGUETA PLACA M2 ### 97,838 97,901 97,766 97,928 97,847 97,865
4.13 ESCALERA MACIZA 3500 PSI M3 ### 918,262 922,946 912,908 924,954 918,931 920,269
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 93,930 93,998 93,852 94,027 93,940 93,959
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 75,896 76,365 75,361 76,566 75,963 76,097
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 85,055 85,628 84,400 85,874 85,137 85,301
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 98,775 99,494 97,954 99,802 98,878 99,083
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 672,270 676,954 666,916 678,962 672,939 674,277
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,292 48,437 48,127 48,499 48,313 48,354
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 266,617 268,709 264,225 269,605 266,916 267,513
4.21 ACERO FIGURADO 37000 PSI KG ### 4,141 4,141 4,141 4,141 4,141 4,141
4.22 ACERO FIGURADO 60000 PSI KG ### 4,343 4,343 4,343 4,343 4,343 4,343
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,118 6,118 6,118 6,118 6,118 6,118
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 818,940 823,625 813,586 825,632 819,610 820,948
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 740,600 745,726 734,740 747,923 741,332 742,797
4.26 VIGA AÉREA 3500 PSI M3 ### 812,720 817,404 807,366 819,411 813,389 814,727
4.27 VIGA CINTA 3500 PSI M3 ### 792,633 797,318 787,279 799,325 793,303 794,641
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,002,995 1,007,679 997,641 1,009,687 1,003,664 1,005,002
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 287,085 292,233 281,204 294,439 287,821 289,292
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 28,717 28,830 28,588 28,878 28,733 28,765
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,081 49,194 48,952 49,242 49,097 49,130
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 34,600 34,617 34,582 34,624 34,603 34,607
5.4 ARCOS EN LADRILLO PRENSADO ML ### 162,720 162,753 162,683 162,766 162,725 162,734
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,092 43,236 42,926 43,298 43,112 43,154
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,705 26,773 26,627 26,802 26,715 26,734
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 97,083 97,148 97,009 97,176 97,092 97,111
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 87,343 87,825 86,791 88,032 87,412 87,550
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 90,802 90,802 90,802 90,802 90,802 90,802
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,325 53,325 53,325 53,325 53,325 53,325
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 87,467 87,467 87,467 87,467 87,467 87,467
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,657 51,657 51,657 51,657 51,657 51,657
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 101,294 101,294 101,294 101,294 101,294 101,294
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 59,892 59,892 59,892 59,892 59,892 59,892
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 112,613 112,613 112,613 112,613 112,613 112,613
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 65,552 65,552 65,552 65,552 65,552 65,552
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 39,881 39,913 39,843 39,927 39,885 39,895
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,254 24,270 24,235 24,277 24,256 24,261
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 52,256 52,278 52,231 52,287 52,259 52,265
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 31,507 31,518 31,495 31,523 31,509 31,512
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 58,832 58,854 58,807 58,863 58,835 58,841
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 35,469 35,480 35,456 35,484 35,470 35,473
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 96,430 96,539 96,306 96,586 96,446 96,477
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 57,294 57,349 57,232 57,372 57,302 57,318
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 36,713 36,735 36,689 36,744 36,717 36,723
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,338 22,348 22,325 22,353 22,339 22,342
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 72,977 73,021 72,928 73,039 72,984 72,996
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,150 44,172 44,125 44,181 44,153 44,159
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 87,043 87,112 86,966 87,141 87,053 87,073
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 52,860 52,894 52,821 52,909 52,865 52,875
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 177,715 177,867 177,541 177,932 177,737 177,780
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 107,251 107,327 107,164 107,360 107,262 107,284
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 87,689 87,757 87,612 87,786 87,699 87,719
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 53,183 53,217 53,144 53,232 53,188 53,198
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 45,715 45,764 45,659 45,785 45,722 45,736
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 27,956 27,980 27,928 27,991 27,960 27,967
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,216 33,238 33,191 33,247 33,219 33,225
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,314 20,325 20,301 20,329 20,315 20,318
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 49,886 49,930 49,836 49,948 49,892 49,905
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 30,724 30,746 30,699 30,755 30,727 30,733
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 96,518 96,583 96,443 96,611 96,527 96,546
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 59,007 59,040 58,970 59,054 59,012 59,021
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 70,629 70,673 70,580 70,692 70,636 70,648
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 42,792 42,813 42,767 42,823 42,795 42,801
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 147,291 147,444 147,117 147,509 147,313 147,357
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 90,031 90,107 89,943 90,139 90,041 90,063
5.47 REMATES LADRILLO PRENSADO ML ### 31,305 31,322 31,287 31,329 31,308 31,312
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 35,146 35,195 35,091 35,216 35,153 35,167
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 59,749 59,814 59,675 59,842 59,758 59,777
5.50 LAVADA DE FACHADA M2 ### 5,242 5,242 5,242 5,242 5,242 5,242
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,441 49,554 49,312 49,602 49,457 49,490
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,592 10,592 10,592 10,592 10,592 10,592
5.53 ANCLAJE 3/8" L=30CM UN ### 13,937 13,937 13,937 13,937 13,937 13,937
5.54 ANCLAJE 1/2" L=50CM UN ### 18,196 18,196 18,196 18,196 18,196 18,196
5.55 ANCLAJE 5/8" L=70CM UN ### 25,375 25,375 25,375 25,375 25,375 25,375
5.56 ANCLAJE 3/4" L=70CM UN ### 37,707 37,707 37,707 37,707 37,707 37,707
5.57 ANCLAJE 1" L= 70CM UN ### 4,688 4,722 4,648 4,737 4,693 4,703
6 PAÑETES, REVOQUES Y REPELLOS
6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,113 16,113 16,113 16,113 16,113 16,113
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,435 5,451 5,416 5,458 5,437 5,442
6.3 FILOS O DILATACIONES S/MURO ML ### 6,621 6,637 6,602 6,644 6,623 6,628
6.4 GOTERA EN MORTERO 1:4 ML ### 7,886 7,903 7,868 7,910 7,889 7,893
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,783 6,783 6,783 6,783 6,783 6,783
6.6 MALLA BAJO ENTRAMADO M2 ### 13,649 13,649 13,649 13,649 13,649 13,649
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 23,192 23,240 23,138 23,260 23,199 23,213
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,190 14,214 14,163 14,224 14,194 14,200
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 20,189 20,235 20,137 20,254 20,196 20,209
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,378 12,401 12,352 12,411 12,382 12,388
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 19,301 19,349 19,247 19,369 19,308 19,322
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 11,935 11,958 11,907 11,968 11,938 11,945
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 20,189 20,235 20,137 20,254 20,196 20,209
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,378 12,401 12,352 12,411 12,382 12,388
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 20,758 20,791 20,719 20,806 20,763 20,772
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 12,662 12,678 12,642 12,686 12,664 12,669
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 16,864 16,899 16,825 16,914 16,869 16,879
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,428 10,445 10,408 10,452 10,430 10,435
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,188 16,224 16,147 16,240 16,193 16,204
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,089 10,108 10,069 10,115 10,092 10,097
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 20,967 21,013 20,915 21,033 20,974 20,987
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 12,747 12,770 12,721 12,780 12,751 12,757
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 20,080 20,127 20,025 20,147 20,086 20,100
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,304 12,327 12,277 12,338 12,307 12,314
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 16,798 16,835 16,757 16,850 16,804 16,814
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,377 10,395 10,356 10,403 10,379 10,385
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 20,969 21,016 20,915 21,037 20,976 20,989
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,153 13,176 13,126 13,186 13,156 13,163
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 25,506 25,572 25,432 25,600 25,516 25,534
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7.2 TELA IMPERMEABLE) M2 ### 80,958 81,199 80,682 81,303 80,992 81,061
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 54,800 54,800 54,800 54,800 54,800 54,800
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 21,970 21,970 21,970 21,970 21,970 21,970
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,451 34,451 34,451 34,451 34,451 34,451
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 79,961 79,961 79,961 79,961 79,961 79,961
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 62,698 62,698 62,698 62,698 62,698 62,698
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 36,626 36,626 36,626 36,626 36,626 36,626
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 83,784 83,784 83,784 83,784 83,784 83,784
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 99,972 99,972 99,972 99,972 99,972 99,972
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 146,739 146,739 146,739 146,739 146,739 146,739
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 58,252 58,252 58,252 58,252 58,252 58,252
7.13 CANAL PVC AMAZONAS ML ### 81,099 81,099 81,099 81,099 81,099 81,099
7.14 CANAL PVC RAINGO ML ### 73,799 73,799 73,799 73,799 73,799 73,799
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 130,313 130,313 130,313 130,313 130,313 130,313
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 76,015 76,015 76,015 76,015 76,015 76,015
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 55,922 55,922 55,922 55,922 55,922 55,922
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,174 32,174 32,174 32,174 32,174 32,174
7.19 TEJA DE BARRO M2 ### 57,501 57,582 57,408 57,617 57,513 57,536
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 46,607 46,607 46,607 46,607 46,607 46,607
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 42,748 42,748 42,748 42,748 42,748 42,748
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,299 36,299 36,299 36,299 36,299 36,299
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 35,521 35,521 35,521 35,521 35,521 35,521
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 35,787 35,787 35,787 35,787 35,787 35,787
7.25 TEJA TERMOACÚSTICA M2 ### 50,170 50,170 50,170 50,170 50,170 50,170
7.26 TEJA PLÁSTICA No.6 M2 ### 44,156 44,156 44,156 44,156 44,156 44,156
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 80,537 80,537 80,537 80,537 80,537 80,537
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 148,369 148,369 148,369 148,369 148,369 148,369
7.29 TEJA SIN TRASLAPO M2 ### 66,828 66,828 66,828 66,828 66,828 66,828
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,463 42,463 42,463 42,463 42,463 42,463
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,181 33,181 33,181 33,181 33,181 33,181
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM) M2 ### 57,478 57,478 57,478 57,478 57,478 57,478
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 19,991 19,991 19,991 19,991 19,991 19,991
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 23,971 23,971 23,971 23,971 23,971 23,971
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 25,913 25,913 25,913 25,913 25,913 25,913
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,260 33,260 33,260 33,260 33,260 33,260
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,054 22,054 22,054 22,054 22,054 22,054
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 51,870 51,870 51,870 51,870 51,870 51,870
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 350,798 350,798 350,798 350,798 350,798 350,798
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 407,970 407,970 407,970 407,970 407,970 407,970
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 267,955 267,955 267,955 267,955 267,955 267,955
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 285,904 285,904 285,904 285,904 285,904 285,904
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 418,538 423,498 412,870 425,623 419,246 420,664
8.2 CONCRETO 3500 PSI M3 ### 364,272 368,820 359,074 370,769 364,922 366,221
8.3 CONCRETO 3000 PSI M3 ### 361,719 366,394 356,376 368,398 362,387 363,723
8.4 CONCRETO 2500 PSI M3 ### 317,783 322,609 312,268 324,677 318,473 319,851
8.5 CONCRETO 2000 PSI M3 ### 293,886 298,800 288,271 300,906 294,588 295,992
8.6 CONCRETO 1500 PSI M3 ### 263,613 268,611 257,903 270,752 264,327 265,755
8.7 MORTERO SECO 1:10 M3 ### 195,537 197,778 192,976 198,739 195,857 196,498
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 405,523 407,699 403,036 408,632 405,834 406,456
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 363,252 365,510 360,672 366,477 363,575 364,220
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 426,434 428,545 424,021 429,450 426,735 427,339
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 648,854 650,965 646,441 651,870 649,155 649,759
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 122,127 122,127 122,127 122,127 122,127 122,127
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,648 3,664 3,629 3,671 3,650 3,655
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 136,943 136,943 136,943 136,943 136,943 136,943
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 167,390 167,390 167,390 167,390 167,390 167,390
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 242,122 242,122 242,122 242,122 242,122 242,122
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 269,413 269,413 269,413 269,413 269,413 269,413
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 296,737 296,737 296,737 296,737 296,737 296,737
9.8 HOJA PUERTA FORTEC 0.81 UN ### 196,889 196,889 196,889 196,889 196,889 196,889
9.9 HOJA PUERTA FORTEC 0.91 UN ### 223,154 223,154 223,154 223,154 223,154 223,154
9.10 HOJA PUERTA FORTEC 1.50 UN ### 328,214 328,214 328,214 328,214 328,214 328,214
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 124,659 124,659 124,659 124,659 124,659 124,659
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 165,370 165,370 165,370 165,370 165,370 165,370
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 183,756 183,756 183,756 183,756 183,756 183,756
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 467,421 467,421 467,421 467,421 467,421 467,421
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 41,826 41,826 41,826 41,826 41,826 41,826
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,215 26,215 26,215 26,215 26,215 26,215
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 98,909 98,909 98,909 98,909 98,909 98,909
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 119,680 119,680 119,680 119,680 119,680 119,680
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,021 93,021 93,021 93,021 93,021 93,021
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 28,986 28,986 28,986 28,986 28,986 28,986
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 28,986 28,986 28,986 28,986 28,986 28,986
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,489 27,489 27,489 27,489 27,489 27,489
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,100 42,100 42,100 42,100 42,100 42,100
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,049 52,049 52,049 52,049 52,049 52,049
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 62,660 62,660 62,660 62,660 62,660 62,660
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,261 75,261 75,261 75,261 75,261 75,261
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 353,388 353,388 353,388 353,388 353,388 353,388
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 247,277 247,277 247,277 247,277 247,277 247,277
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,479 33,479 33,479 33,479 33,479 33,479
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 42,764 42,764 42,764 42,764 42,764 42,764
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,049 52,049 52,049 52,049 52,049 52,049
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,312 65,312 65,312 65,312 65,312 65,312
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 75,514 75,514 75,514 75,514 75,514 75,514
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 208,895 208,895 208,895 208,895 208,895 208,895
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO) ML ### 80,128 80,128 80,128 80,128 80,128 80,128
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,033 144,033 144,033 144,033 144,033 144,033
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 135,659 135,659 135,659 135,659 135,659 135,659
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,083 89,083 89,083 89,083 89,083 89,083
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 209,609 209,609 209,609 209,609 209,609 209,609
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 109,383 109,383 109,383 109,383 109,383 109,383
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,574 6,574 6,574 6,574 6,574 6,574
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 99,448 99,448 99,448 99,448 99,448 99,448
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 128,111 128,111 128,111 128,111 128,111 128,111
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 387,884 387,884 387,884 387,884 387,884 387,884
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,001 6,001 6,001 6,001 6,001 6,001
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 273,264 273,264 273,264 273,264 273,264 273,264
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 121,815 121,815 121,815 121,815 121,815 121,815
10.21 REJILLA PISO 0.30 M M2 ### 85,540 85,540 85,540 85,540 85,540 85,540
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 88,408 88,408 88,408 88,408 88,408 88,408
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,555 10,555 10,555 10,555 10,555 10,555
SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,694 11,694 11,694 11,694 11,694 11,694
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 278,876 278,876 278,876 278,876 278,876 278,876
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 463,753 463,753 463,753 463,753 463,753 463,753
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,496 6,496 6,496 6,496 6,496 6,496
11.59 GABINETE TIPO III UN ### 1,005,145 1,005,145 1,005,145 1,005,145 1,005,145 1,005,145
11.60 GABINETE TIPO I UN ### 769,020 769,020 769,020 769,020 769,020 769,020
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,572,956 2,572,956 2,572,956 2,572,956 2,572,956 2,572,956
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,145,799 2,145,799 2,145,799 2,145,799 2,145,799 2,145,799
11.63 VÁLVULA MARIPOSA 3" UN ### 625,891 625,891 625,891 625,891 625,891 625,891
11.64 VÁLVULA MARIPOSA 4" UN ### 808,697 808,697 808,697 808,697 808,697 808,697
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 310,105 310,105 310,105 310,105 310,105 310,105
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 360,004 360,004 360,004 360,004 360,004 360,004
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 57,194 57,194 57,194 57,194 57,194 57,194
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 67,650 67,650 67,650 67,650 67,650 67,650
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 75,181 75,181 75,181 75,181 75,181 75,181
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 88,475 88,475 88,475 88,475 88,475 88,475
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 53,802 53,802 53,802 53,802 53,802 53,802
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,297 61,297 61,297 61,297 61,297 61,297
12.8 STRIP TELEFÓNICO 10 PARES UN ### 141,896 141,896 141,896 141,896 141,896 141,896
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 55,224 55,224 55,224 55,224 55,224 55,224
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 126,830 126,830 126,830 126,830 126,830 126,830
12.11 SALIDA T.V PVC COMPLETA. UN ### 75,914 75,914 75,914 75,914 75,914 75,914
12.12 SALIDA BIFÁSICA C.N. UN ### 45,005 45,005 45,005 45,005 45,005 45,005
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,038 95,038 95,038 95,038 95,038 95,038
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 405,964 405,964 405,964 405,964 405,964 405,964
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 540,377 540,377 540,377 540,377 540,377 540,377
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,497 3,497 3,497 3,497 3,497 3,497
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,621 4,621 4,621 4,621 4,621 4,621
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,183 7,183 7,183 7,183 7,183 7,183
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,853 12,853 12,853 12,853 12,853 12,853
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 269,881 269,881 269,881 269,881 269,881 269,881
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,377 76,377 76,377 76,377 76,377 76,377
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 103,191 103,191 103,191 103,191 103,191 103,191
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,453 42,453 42,453 42,453 42,453 42,453
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,386,468 1,386,468 1,386,468 1,386,468 1,386,468 1,386,468
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,027,690 1,027,690 1,027,690 1,027,690 1,027,690 1,027,690
12.26 POSTE METÁLICO 6M UN ### 1,279,036 1,279,036 1,279,036 1,279,036 1,279,036 1,279,036
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 594,089 594,089 594,089 594,089 594,089 594,089
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 108,904 108,904 108,904 108,904 108,904 108,904
12.29 LUMINARIA 70W SODIO UN ### 498,312 498,312 498,312 498,312 498,312 498,312
12.30 LUMINARIA 150W SODIO UN ### 623,238 623,238 623,238 623,238 623,238 623,238
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,644,905 1,644,905 1,644,905 1,644,905 1,644,905 1,644,905
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,211,529 1,211,529 1,211,529 1,211,529 1,211,529 1,211,529
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 37,855 37,937 37,763 37,971 37,867 37,890
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 37,426 37,508 37,334 37,542 37,438 37,461
13.3 ALISTADO PARA LISTÓN M2 ### 14,382 14,398 14,363 14,405 14,384 14,389
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 24,437 24,599 24,251 24,669 24,460 24,506
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 80,798 80,960 80,612 81,030 80,821 80,868
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,115 26,213 26,003 26,255 26,129 26,157
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 54,492 54,975 53,941 55,182 54,561 54,699
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 74,765 75,537 73,883 75,868 74,875 75,096
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,218 30,218 30,218 30,218 30,218 30,218
13.10 PEGANTE MORTERO-CONCRETO M2 ### 22,993 22,993 22,993 22,993 22,993 22,993
13.11 PERMA PLY 2 CAPAS M2 ### 27,032 27,032 27,032 27,032 27,032 27,032
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 44,052 44,486 43,556 44,673 44,114 44,238
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 51,449 51,980 50,843 52,208 51,525 51,677
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 74,169 74,990 73,232 75,341 74,286 74,521
13.15 TRITURADO FINO 1/2 M3 ### 75,896 79,286 72,021 80,740 76,380 77,349
13.16 TRITURADO GRUESO 3/4 M3 ### 86,846 90,861 83,168 91,444 88,102 90,216
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 56,398 56,431 56,361 56,445 56,403 56,412
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 33,870 33,887 33,852 33,894 33,873 33,877
14.3 ADOQUÍN CONCRETO 6CM M2 ### 63,546 63,628 63,454 63,662 63,558 63,581
14.4 ADOQUÍN CONCRETO 8CM M2 ### 66,796 66,878 66,704 66,912 66,808 66,831
14.5 ADOQUÍN GRES PEATONAL M2 ### 71,072 71,153 70,979 71,188 71,083 71,106
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO M2 ### 74,381 74,414 74,344 74,428 74,386 74,395
14.7 GRAVILLA PARA GRADAS ML ### 37,077 37,129 37,018 37,151 37,085 37,100
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 160,148 160,295 159,981 160,357 160,169 160,211
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 45,416 45,536 45,279 45,587 45,433 45,467
14.10 GUARDAESCOBA EN GRANITO ML ### 44,091 44,091 44,091 44,091 44,091 44,091
14.11 GUARDAESCOBA EN GRAVILLA ML ### 9,778 9,829 9,718 9,852 9,785 9,800
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,330 9,330 9,330 9,330 9,330 9,330
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,511 12,511 12,511 12,511 12,511 12,511
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,547 10,547 10,547 10,547 10,547 10,547
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,580 17,580 17,580 17,580 17,580 17,580
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,127 34,127 34,127 34,127 34,127 34,127
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,320 9,320 9,320 9,320 9,320 9,320
14.18 LISTÓN M.H. AMARILLO M2 ### 74,411 74,411 74,411 74,411 74,411 74,411
14.19 PASO ESCALERA GRANITO ML ### 116,324 116,437 116,194 116,486 116,340 116,372
14.20 PIRLANES ALUMINIO ML ### 7,642 7,642 7,642 7,642 7,642 7,642
14.21 PIRLANES LADRILLO ML ### 31,591 31,624 31,554 31,638 31,596 31,605
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 45,743 45,743 45,743 45,743 45,743 45,743
14.23 PISO VINILO TRÁFICO PESADO M2 ### 53,100 53,100 53,100 53,100 53,100 53,100
14.24 PULIDA LACADA PISO MADERA M2 ### 49,298 49,298 49,298 49,298 49,298 49,298
14.25 TABLETA DE GRES 25X25 M2 ### 48,870 48,902 48,833 48,916 48,875 48,884
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 54,876 54,908 54,839 54,922 54,881 54,890
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,030 11,030 11,030 11,030 11,030 11,030
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 48,659 48,707 48,603 48,728 48,666 48,680
14.29 JABONERA PORCELANA ACUARIO UN ### 20,569 20,569 20,569 20,569 20,569 20,569
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14.30 Y PERCHA SIMPLE) UN ### 122,853 122,853 122,853 122,853 122,853 122,853
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,032 10,032 10,032 10,032 10,032 10,032
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,485 22,485 22,485 22,485 22,485 22,485
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,497 14,497 14,497 14,497 14,497 14,497
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,090 14,090 14,090 14,090 14,090 14,090
14.35 REMATES BOCEL ALUMINIO ML ### 8,638 8,638 8,638 8,638 8,638 8,638
14.36 REMATES BOCEL PORCELANA ML ### 8,786 8,786 8,786 8,786 8,786 8,786
14.37 TAPA REGISTRO 20X20 UN ### 19,080 19,080 19,080 19,080 19,080 19,080
14.38 TAPA REGISTRO 6X6 UN ### 17,406 17,406 17,406 17,406 17,406 17,406
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,517 18,517 18,517 18,517 18,517 18,517
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO
14.40 EN SITIO M2 ### 21,406 21,406 21,406 21,406 21,406 21,406
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 64,382 64,415 64,345 64,429 64,387 64,396
14.42 MEDIA CAÑA EN GRANITO ML ### 76,997 76,997 76,997 76,997 76,997 76,997
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,577 34,577 34,577 34,577 34,577 34,577
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,291 13,291 13,291 13,291 13,291 13,291
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 100,932 100,932 100,932 100,932 100,932 100,932
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 122,336 122,336 122,336 122,336 122,336 122,336
15 CIELO RASO
15.1 APLIQUE YESO ML ### 72,371 72,371 72,371 72,371 72,371 72,371
15.2 ARMADURA MADERA Y MALLA M2 ### 36,241 36,241 36,241 36,241 36,241 36,241
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 55,517 55,517 55,517 55,517 55,517 55,517
15.4 CIELO RASO DURACUSTIC M2 ### 67,982 67,982 67,982 67,982 67,982 67,982
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 50,797 50,797 50,797 50,797 50,797 50,797
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 93,914 93,914 93,914 93,914 93,914 93,914
15.7 CORNISAS YESO ML ### 48,539 48,539 48,539 48,539 48,539 48,539
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 103,672 103,672 103,672 103,672 103,672 103,672
15.9 MALLA CON VENA M2 ### 13,555 13,555 13,555 13,555 13,555 13,555
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707 43,707
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 181,335 181,335 181,335 181,335 181,335 181,335
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 397,724 397,724 397,724 397,724 397,724 397,724
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,015,470 1,015,470 1,015,470 1,015,470 1,015,470 1,015,470
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 289,248 289,248 289,248 289,248 289,248 289,248
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 205,397 205,397 205,397 205,397 205,397 205,397
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,410 82,410 82,410 82,410 82,410 82,410
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 248,275 248,275 248,275 248,275 248,275 248,275
2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,105 35,105 35,105 35,105 35,105 35,105
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481 481 481
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 545,154 558,334 546,802 564,924 558,334 548,449
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 581,381 594,561 583,028 601,151 594,561 584,676
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 551,404 564,584 553,052 571,174 564,584 554,699
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 358,658 352,385 371,633 350,711 349,933 364,986
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 255,424 253,711 282,838 277,698 301,686 263,991
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 249,548 247,835 276,963 271,823 295,810 258,115
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 37,798 37,798 37,798 37,798 37,798 37,798
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 167,298 167,298 167,298 167,298 167,298 167,298
3.15 311.1 AFIRMADO M3 ### 61,819 67,004 63,577 63,577 67,004 72,144
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,196 11,267 11,115 11,298 11,206 11,227
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,465 4,501 4,425 4,516 4,470 4,481
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3.18 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 599,725 604,216 594,594 606,140 600,367 601,650
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,677,800 1,682,475 1,672,457 1,684,479 1,678,468 1,679,804
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,148 14,148 14,148 14,148 14,148 14,148
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,016 19,016 19,016 19,016 19,016 19,016
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 22,780 22,780 22,780 22,780 22,780 22,780
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,196 15,196 15,196 15,196 15,196 15,196
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,534 24,534 24,534 24,534 24,534 24,534
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,386 9,386 9,386 9,386 9,386 9,386
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
CONSTRUCCIÓN
#REF!
#REF!
4 #REF! #REF! 746.63 #REF! #REF!
5 #REF! #REF! 632.94 #REF! #REF!
6 #REF! #REF! 632.94 #REF! #REF!
#REF!
12 #REF! M3 7.02 $ 446,679 $ 3,135,687
SEÑALIZACIÓN
16 #REF! #REF! 1600.00 #REF! #REF!
17 #REF! #REF! 30.04 #REF! #REF!
COSTO DIRECTO $ 517,864,322
ADMINISTRACION % 20 $ 103,572,864
IMPREVISTOS % 5 $ 25,893,216
UTILIDAD % 5 $ 25,893,216
COSTOS INDIRECTOS % 30 $ 155,359,297
TOTAL OBRA $ 673,223,618
ITEMS PARA ELEABORACION DE ESTUDIOS Y DISEÑOS
ESTUDIOS Y DISEÑOS PARA VIA CANAVITA – ALPINA (JURIDICCION DE
18 GL 1.00 $ 39,444,708 $ 39,444,708
SOPÓ), (NO INCLUYE DISEÑOS DE ANDENES)
COSTO DIRECTO $ 39,444,708
IVA % 19 $ 7,494,495
COSTO TOTAL ESTUDIOS Y DISEÑOS $ 46,939,203
53 DE 63
PRESUPUESTO
C F-1a
Hoja 1 de 1
54 DE 63
Asfalto 0.13
Base 0.25
Subbase 0.25
Rajon 0.3
TOTAL 0.93
asfalto
mejoramiento 2400 13.75 75 2488.75 m2
parcheo de 2 x 2 7 28 m2
parcheo de 1 x 1 15 15 m2
total 2531.75 m2
l a espesor volumen
cuneta 39 1.5 0.12 7.02
bordillo 36
PROYECTO:
RECOPILACION Y ELABORACION DE
DURACION (meses): 2 ANALISIS DE ESTUDIOS Y DISEÑOS Y
INFORMACION APROBACIÓN
Vr. H/MES / VR.
PERSONAL ESPECIALISTA, PROFESIONAL O DE APOYO CANT Mes 1 Mes 2 TOTAL
UNIT
Director de Consultoria 1 $ 3,036,100 20% 100% 120%
Especialista en Tránsito y Transporte 1 $ 4,129,164 20% 30% 50%
Especialista en Geotecnia 1 $ 4,129,164 20% 30% 50%
Especialista en Pavimentos 1 $ 4,129,164 20% 30% 50%
Especialista en redes Hidrosanitarias 1 $ 4,129,164 20% 10% 30%
Especialista en redes electrica, gas, telefono, fibra optica 1 $ 4,129,164 20% 10% 30%
Ingeniero y/o Arquitecto (Costos, Presupuestos y Programacion) 1 $ 3,036,100 0% 20% 20%
Topografo 1 $ 3,036,100 50% 20% 70%
PERSONAL AUXILIAR TÉCNICO - CADENERO 1 1 $ 1,479,000 50% 20% 70%
SUBTOTAL 1
COSTOS OPERACIONALES
COSTO UNITARIO
ALQUILER EQUIPO, SUMINISTROS Y OTROS ELEMENTOS CANT Mes 1 Mes 2 TOTAL
SIN IVA ($)
ALQUILER - DISTANCIOMETRO (Incluyendo tránsito y Estación
1 $ 2,500,000 50% 50%
Total) - Capacidad de Lectura hasta 1500m
INFORMES, PLANOS, PAPELERIA, FOTOCOPIAS Y OTROS 1 $ 400,000 20% 20% 40%
SUBTOTAL 2
COSTO UNITARIO
ACTIVIDADES A PRECIO UNITARIO CANT Mes 1 Mes 2 TOTAL
SIN IVA($)
Ensayos de Laboratorio Geotecnia, CBR, Modulo resiliente de suelos
y agregados, Penetrometro dinamico de cono y los que se requieran 1 $ 5,870,000 1.00 1.00
para el diseño
SUBTOTAL 3
RECOPILACION Y ELABORACION DE
DURACION (meses): 2 ANALISIS DE ESTUDIOS Y DISEÑOS Y
INFORMACION APROBACIÓN
OBSERVACIONES:
PROYECTO:
FACTOR
COSTO ($) TOTAL
MULTIPLICADOR
2.00 $ 7,286,640
2.00 $ 4,129,164
2.00 $ 4,129,164
2.00 $ 4,129,164
2.00 $ 2,477,498
2.00 $ 2,477,498
2.00 $ 1,214,440
2.00 $ 4,250,540
2.00 $ 2,070,600
$ 32,164,708
FACTOR
COSTO ($) TOTAL
MULTIPLICADOR
1.00 $ 1,250,000
1.00 $ 160,000
$ 1,410,000
FACTOR
COSTO ($) TOTAL
MULTIPLICADOR
1.00 $ 5,870,000
$ 5,870,000
$ 39,444,708
$ 7,494,495
$ 46,939,203
PROYECTO:
RECOPILACION Y ELABORACION DE
DURACION (meses): 6 ANALISIS DE ESTUDIOS Y DISEÑOS CONSTRUCCION
INFORMACION Y APROBACIÓN
PERSONAL ESPECIALISTA, PROFESIONAL O DE APOYO / Mes Mes Mes Mes Mes Mes
CANTIDAD Vr. H/MES $ / VR. UNIT TOTAL
DESCRIPCION 1 2 3 4 5 6
COSTOS OPERACIONALES
COSTO
ALQUILER EQUIPO, SUMINISTROS Y OTROS
CANTIDAD UNIDAD UNITARIO SIN
Mes Mes Mes Mes Mes Mes
TOTAL
ELEMENTOS 1 2 3 4 5 6
IVA ($)
PERSONAL ESPECIALISTA, PROFESIONAL O DE APOYO / Mes Mes Mes Mes Mes Mes
CANTIDAD Vr. H/MES $ / VR. UNIT TOTAL
DESCRIPCION 1 2 3 4 5 6
OBSERVACIONES:
FACTOR
COSTO ($) TOTAL
MULTIPLICADOR
2.00 $ 4,554,150
2.00 $ 24,288,800
2.00 $ 1,651,666
2.00 $ 2,890,415
2.00 $ 4,129,164
2.00 $ 2,890,415
2.00 $ 2,890,415
2.00 $ 1,821,660
2.00 $ 1,821,660
$ 46,938,344
FACTOR
COSTO TOTAL
MULTIPLICADOR
1.00 $ 360,000
$ 360,000
1.00 $ 2,985,000
FACTOR
COSTO ($) TOTAL
MULTIPLICADOR
$ 2,985,000