Documentos de Académico
Documentos de Profesional
Documentos de Cultura
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,018 42,018 42,018 42,018
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 55,436 55,436 55,436 55,436
4.3 COLUMNAS 3500 PSI M3 ### 805,952 825,056 843,100 826,117
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 261,927 282,756 304,122 285,144
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI
M2 ### 98,211 100,066 101,817 100,169
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI M2 ### 115,798 118,024 120,126 118,147
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 129,548 132,515 135,318 132,680
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 136,684 139,837 142,815 140,012
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 156,600 160,496 164,174 160,712
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 174,176 178,627 182,831 178,874
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 193,312 198,320 203,050 198,598
4.12 ENTREPISO VIGUETA PLACA M2 ### 99,270 99,614 99,938 99,633
4.13 ESCALERA MACIZA 3500 PSI M3 ### 953,112 972,216 990,260 973,277
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 95,100 95,409 95,701 95,426
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 79,305 81,215 83,020 81,321
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 89,204 91,541 93,748 91,671
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 103,953 106,884 109,652 107,047
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 705,757 724,862 742,905 725,922
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 49,421 50,019 50,583 50,052
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 281,471 290,003 298,061 290,477
4.21 ACERO FIGURADO 37000 PSI KG ### 4,168 4,168 4,168 4,168
4.22 ACERO FIGURADO 60000 PSI KG ### 4,371 4,371 4,371 4,371
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,145 6,145 6,145 6,145
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 852,611 871,715 889,759 872,776
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 777,085 797,988 817,731 799,149
4.26 VIGA AÉREA 3500 PSI M3 ### 846,480 865,584 883,628 866,645
4.27 VIGA CINTA 3500 PSI M3 ### 826,397 845,501 863,545 846,562
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,036,830 1,055,935 1,073,978 1,056,995
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 319,851 340,377 359,762 341,517
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,747 30,247 30,718 30,274
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ###
i 50,121 50,620 51,092 50,648
p
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ###i 35,003 35,104 35,199 35,110
5.4 ARCOS EN LADRILLO PRENSADO ML ###o 163,829 164,031 164,222 164,042
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,216 44,814 45,378 44,847
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,422 27,731 28,023 27,748
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 98,793 99,197 99,578 99,219
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 91,077 93,069 94,950 93,180
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 91,219 91,219 91,219 91,219
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,533 53,533 53,533 53,533
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 87,859 87,859 87,859 87,859
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,853 51,853 51,853 51,853
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 101,818 101,818 101,818 101,818
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,154 60,154 60,154 60,154
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 113,220 113,220 113,220 113,220
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 65,855 65,855 65,855 65,855
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 40,656 40,859 41,050 40,870
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,642 24,743 24,839 24,749
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 52,932 53,067 53,195 53,075
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 31,845 31,913 31,977 31,917
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,548 59,683 59,811 59,691
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 35,827 35,894 35,958 35,898
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 98,952 99,628 100,266 99,665
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,555 58,893 59,212 58,912
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,279 37,414 37,542 37,421
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,620 22,688 22,752 22,692
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 74,118 74,389 74,644 74,404
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,720 44,855 44,983 44,863
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 88,144 88,453 88,745 88,470
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,410 53,565 53,711 53,574
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 181,522 182,468 183,362 182,521
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 109,155 109,628 110,075 109,654
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 90,655 91,300 91,910 91,336
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,666 54,989 55,293 55,007
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 46,820 47,123 47,408 47,139
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,509 28,660 28,803 28,668
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,762 33,898 34,025 33,905
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,587 20,655 20,718 20,658
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 50,954 51,224 51,480 51,239
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,258 31,393 31,521 31,401
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
5.41 MURO TOLETE COMÚN 0.25 M M2 ###
i 98,261 98,667 99,050 98,690
p
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ###i 59,879 60,082 60,273 60,093
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ###o 71,771 72,041 72,296 72,056
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,367 43,502 43,629 43,509
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 150,846 151,792 152,686 151,845
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 91,814 92,287 92,734 92,313
5.47 REMATES LADRILLO PRENSADO ML ### 31,733 31,834 31,929 31,839
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 37,098 37,563 38,001 37,588
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 62,403 63,022 63,606 63,056
5.50 LAVADA DE FACHADA M2 ### 5,245 5,245 5,245 5,245
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 50,482 50,981 51,453 51,009
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,601 10,601 10,601 10,601
5.53 ANCLAJE 3/8" L=30CM UN ### 13,964 13,964 13,964 13,964
5.54 ANCLAJE 1/2" L=50CM UN ### 18,235 18,235 18,235 18,235
5.55 ANCLAJE 5/8" L=70CM UN ### 25,455 25,455 25,455 25,455
5.56 ANCLAJE 3/4" L=70CM UN ### 37,859 37,859 37,859 37,859
5.57 ANCLAJE 1" L= 70CM UN ### 4,926 5,067 5,201 5,075
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 26,778 27,184 27,567 27,206
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE) M2 ### 83,054 84,050 84,990 84,105
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,131 55,131 55,131 55,131
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,071 22,071 22,071 22,071
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,622 34,622 34,622 34,622
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 80,469 80,469 80,469 80,469
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,078 63,078 63,078 63,078
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 36,812 36,812 36,812 36,812
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 84,319 84,319 84,319 84,319
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 100,628 100,628 100,628 100,628
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 147,742 147,742 147,742 147,742
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 58,586 58,586 58,586 58,586
7.13 CANAL PVC AMAZONAS ML ### 81,527 81,527 81,527 81,527
7.14 CANAL PVC RAINGO ML ### 74,174 74,174 74,174 74,174
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 131,126 131,126 131,126 131,126
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 76,510 76,510 76,510 76,510
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 56,268 56,268 56,268 56,268
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,302 32,302 32,302 32,302
7.19 TEJA DE BARRO M2 ### 59,229 59,733 60,210 59,761
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 46,898 46,898 46,898 46,898
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,010 43,010 43,010 43,010
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,470 36,470 36,470 36,470
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 35,693 35,693 35,693 35,693
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 35,960 35,960 35,960 35,960
7.25 TEJA TERMOACÚSTICA M2 ### 50,455 50,455 50,455 50,455
7.26 TEJA PLÁSTICA No.6 M2 ### 44,397 44,397 44,397 44,397
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 81,038 81,038 81,038 81,038
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 149,362 149,362 149,362 149,362
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
7.29 TEJA SIN TRASLAPO M2 ###
i 67,248 67,248 67,248 67,248
p
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ###i 42,606 42,606 42,606 42,606
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ###o 33,312 33,312 33,312 33,312
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2",
7.32 15 MM) M2 ### 57,788 57,788 57,788 57,788
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,052 20,052 20,052 20,052
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,061 24,061 24,061 24,061
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,023 26,023 26,023 26,023
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,424 33,424 33,424 33,424
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,142 22,142 22,142 22,142
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,089 52,089 52,089 52,089
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 353,312 353,312 353,312 353,312
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 409,286 409,286 409,286 409,286
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 269,558 269,558 269,558 269,558
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 287,695 287,695 287,695 287,695
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 455,180 475,650 494,983 476,787
8.2 CONCRETO 3500 PSI M3 ### 396,453 415,001 432,519 416,031
8.3 CONCRETO 3000 PSI M3 ### 393,701 412,605 430,460 413,656
8.4 CONCRETO 2500 PSI M3 ### 352,726 372,643 391,453 373,749
8.5 CONCRETO 2000 PSI M3 ### 327,614 347,602 366,480 348,712
8.6 CONCRETO 1500 PSI M3 ### 295,424 315,352 334,173 316,459
8.7 MORTERO SECO 1:10 M3 ### 237,902 251,825 264,973 252,598
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 447,910 461,429 474,197 462,180
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 448,344 469,846 490,154 471,041
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 506,649 526,759 545,752 527,877
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 730,709 750,819 769,812 751,937
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 122,796 122,796 122,796 122,796
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,962 4,063 4,159 4,069
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 137,627 137,627 137,627 137,627
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 168,300 168,300 168,300 168,300
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 243,718 243,718 243,718 243,718
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 271,207 271,207 271,207 271,207
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 298,729 298,729 298,729 298,729
9.8 HOJA PUERTA FORTEC 0.81 UN ### 198,254 198,254 198,254 198,254
9.9 HOJA PUERTA FORTEC 0.91 UN ### 224,714 224,714 224,714 224,714
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
9.10 HOJA PUERTA FORTEC 1.50 UN ###
i 330,554 330,554 330,554 330,554
p
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ###i 125,488 125,488 125,488 125,488
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ###o 166,501 166,501 166,501 166,501
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 185,023 185,023 185,023 185,023
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 470,794 470,794 470,794 470,794
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,032 42,032 42,032 42,032
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,305 26,305 26,305 26,305
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 99,389 99,389 99,389 99,389
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 120,518 120,518 120,518 120,518
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,661 93,661 93,661 93,661
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,151 29,151 29,151 29,151
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,151 29,151 29,151 29,151
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,643 27,643 27,643 27,643
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,322 42,322 42,322 42,322
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,344 52,344 52,344 52,344
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,033 63,033 63,033 63,033
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,728 75,728 75,728 75,728
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 355,850 355,850 355,850 355,850
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 248,951 248,951 248,951 248,951
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,636 33,636 33,636 33,636
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 42,990 42,990 42,990 42,990
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,344 52,344 52,344 52,344
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,706 65,706 65,706 65,706
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 75,909 75,909 75,909 75,909
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 210,280 210,280 210,280 210,280
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO) ML ### 80,503 80,503 80,503 80,503
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,547 144,547 144,547 144,547
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 136,338 136,338 136,338 136,338
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,523 89,523 89,523 89,523
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 210,728 210,728 210,728 210,728
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 109,917 109,917 109,917 109,917
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,603 6,603 6,603 6,603
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL
10.10 GALVANIZADO 2") M2 ### 99,771 99,771 99,771 99,771
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 120,590 120,590 120,590 120,590
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,066 41,066 41,066 41,066
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ###
i 535,821 535,821 535,821 535,821
p
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ###i 192,995 192,995 192,995 192,995
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ###o 217,124 217,124 217,124 217,124
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 488,889 488,889 488,889 488,889
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 128,586 128,586 128,586 128,586
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 390,597 390,597 390,597 390,597
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,029 6,029 6,029 6,029
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 275,055 275,055 275,055 275,055
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 122,302 122,302 122,302 122,302
10.21 REJILLA PISO 0.30 M M2 ### 85,999 85,999 85,999 85,999
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 88,857 88,857 88,857 88,857
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS,
10.23 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,591 10,591 10,591 10,591
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 11,739 11,739 11,739 11,739
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.25 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
KG ### 9,357 9,357 9,357 9,357
MONTAJE
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 89,146 89,146 89,146 89,146
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 103,501 103,501 103,501 103,501
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 153,176 153,176 153,176 153,176
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 61,809 61,809 61,809 61,809
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ###
i 62,059 62,059 62,059 62,059
p
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ###i 39,918 39,918 39,918 39,918
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ###o 49,126 49,126 49,126 49,126
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,155 4,155 4,155 4,155
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,539 6,539 6,539 6,539
11.59 GABINETE TIPO III UN ### 1,011,365 1,011,365 1,011,365 1,011,365
11.60 GABINETE TIPO I UN ### 773,488 773,488 773,488 773,488
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,591,036 2,591,036 2,591,036 2,591,036
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,160,708 2,160,708 2,160,708 2,160,708
11.63 VÁLVULA MARIPOSA 3" UN ### 629,510 629,510 629,510 629,510
11.64 VÁLVULA MARIPOSA 4" UN ### 813,673 813,673 813,673 813,673
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 312,322 312,322 312,322 312,322
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 362,201 362,201 362,201 362,201
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 57,544 57,544 57,544 57,544
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 68,076 68,076 68,076 68,076
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 75,637 75,637 75,637 75,637
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 89,027 89,027 89,027 89,027
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,133 54,133 54,133 54,133
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,676 61,676 61,676 61,676
12.8 STRIP TELEFÓNICO 10 PARES UN ### 142,660 142,660 142,660 142,660
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 55,559 55,559 55,559 55,559
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 127,623 127,623 127,623 127,623
12.11 SALIDA T.V PVC COMPLETA. UN ### 76,376 76,376 76,376 76,376
12.12 SALIDA BIFÁSICA C.N. UN ### 45,280 45,280 45,280 45,280
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,570 95,570 95,570 95,570
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 408,196 408,196 408,196 408,196
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 543,435 543,435 543,435 543,435
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,518 3,518 3,518 3,518
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,646 4,646 4,646 4,646
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,225 7,225 7,225 7,225
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,927 12,927 12,927 12,927
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 271,478 271,478 271,478 271,478
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,799 76,799 76,799 76,799
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 103,812 103,812 103,812 103,812
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,623 42,623 42,623 42,623
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,393,932 1,393,932 1,393,932 1,393,932
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,033,174 1,033,174 1,033,174 1,033,174
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
12.26 POSTE METÁLICO 6M UN ###
i 1,287,382 1,287,382 1,287,382 1,287,382
p
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ###i 598,233 598,233 598,233 598,233
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ###o 109,552 109,552 109,552 109,552
12.29 LUMINARIA 70W SODIO UN ### 501,821 501,821 501,821 501,821
12.30 LUMINARIA 150W SODIO UN ### 627,674 627,674 627,674 627,674
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,656,913 1,656,913 1,656,913 1,656,913
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,220,321 1,220,321 1,220,321 1,220,321
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,004 41,778 42,508 41,821
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 40,616 41,390 42,120 41,433
13.3 ALISTADO PARA LISTÓN M2 ### 15,017 15,171 15,317 15,180
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 30,528 32,075 33,536 32,161
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 87,277 88,824 90,285 88,910
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,801 27,201 27,578 27,223
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 58,003 59,995 61,876 60,105
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 80,381 83,568 86,578 83,745
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,379 30,379 30,379 30,379
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,077 23,077 23,077 23,077
13.11 PERMA PLY 2 CAPAS M2 ### 27,117 27,117 27,117 27,117
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 47,205 48,998 50,691 49,097
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 55,301 57,492 59,561 57,614
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 80,126 83,512 86,709 83,700
13.15 TRITURADO FINO 1/2 M3 ### 90,253 102,601 114,265 103,288
13.16 TRITURADO GRUESO 3/4 M3 ### 96,928 107,658 126,946 111,040
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,866 58,175 58,467 58,192
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,604 34,759 34,905 34,767
14.3 ADOQUÍN CONCRETO 6CM M2 ### 66,844 67,618 68,348 67,661
14.4 ADOQUÍN CONCRETO 8CM M2 ### 70,144 70,918 71,648 70,961
14.5 ADOQUÍN GRES PEATONAL M2 ### 74,404 75,178 75,908 75,221
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 75,989 76,299 76,591 76,316
14.7 GRAVILLA PARA GRADAS ML ### 37,928 38,227 38,510 38,244
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 166,444 167,836 169,151 167,914
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 47,729 48,482 49,194 48,524
14.10 GUARDAESCOBA EN GRANITO ML ### 44,207 44,207 44,207 44,207
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,614 10,914 11,196 10,930
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,390 9,390 9,390 9,390
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
14.13 GUARDAESCOBA PVC CEDRO ML ###
i 12,595 12,595 12,595 12,595
p
14.14 GUARDAESCOBA PINO CARIBE ML ###i 10,590 10,590 10,590 10,590
14.15 GUARDAESCOBA CEDRO BLANCO ML ###o 17,675 17,675 17,675 17,675
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,345 34,345 34,345 34,345
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,334 9,334 9,334 9,334
14.18 LISTÓN M.H. AMARILLO M2 ### 74,755 74,755 74,755 74,755
14.19 PASO ESCALERA GRANITO ML ### 120,981 122,064 123,086 122,124
14.20 PIRLANES ALUMINIO ML ### 7,647 7,647 7,647 7,647
14.21 PIRLANES LADRILLO ML ### 32,273 32,474 32,665 32,486
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 46,006 46,006 46,006 46,006
14.23 PISO VINILO TRÁFICO PESADO M2 ### 53,421 53,421 53,421 53,421
14.24 PULIDA LACADA PISO MADERA M2 ### 49,497 49,497 49,497 49,497
14.25 TABLETA DE GRES 25X25 M2 ### 50,290 50,599 50,891 50,616
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,341 56,650 56,942 56,667
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,056 11,056 11,056 11,056
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 49,779 50,082 50,368 50,099
14.29 JABONERA PORCELANA ACUARIO UN ### 20,681 20,681 20,681 20,681
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA
14.30 SIMPLE)
UN ### 123,591 123,591 123,591 123,591
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,054 10,054 10,054 10,054
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,600 22,600 22,600 22,600
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,553 14,553 14,553 14,553
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,143 14,143 14,143 14,143
14.35 REMATES BOCEL ALUMINIO ML ### 8,652 8,652 8,652 8,652
14.36 REMATES BOCEL PORCELANA ML ### 8,802 8,802 8,802 8,802
14.37 TAPA REGISTRO 20X20 UN ### 19,169 19,169 19,169 19,169
14.38 TAPA REGISTRO 6X6 UN ### 17,483 17,483 17,483 17,483
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,654 18,654 18,654 18,654
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 21,565 21,565 21,565 21,565
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 65,941 66,250 66,542 66,267
14.42 MEDIA CAÑA EN GRANITO ML ### 77,514 77,514 77,514 77,514
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,603 34,603 34,603 34,603
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,350 13,350 13,350 13,350
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 101,663 101,663 101,663 101,663
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 123,182 123,182 123,182 123,182
15 CIELO RASO
15.1 APLIQUE YESO ML ### 72,849 72,849 72,849 72,849
15.2 ARMADURA MADERA Y MALLA M2 ### 36,321 36,321 36,321 36,321
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ###
i 55,761 55,761 55,761 55,761
p
15.4 CIELO RASO DURACUSTIC M2 ###i 68,317 68,317 68,317 68,317
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ###o 51,034 51,034 51,034 51,034
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 94,423 94,423 94,423 94,423
15.7 CORNISAS YESO ML ### 48,869 48,869 48,869 48,869
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 104,270 104,270 104,270 104,270
15.9 MALLA CON VENA M2 ### 13,586 13,586 13,586 13,586
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
16.2 DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 84,264 84,264 123,672 96,258
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 111,264 127,181 142,214 128,066
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 170,484 203,038 240,733 209,892
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 75,956 75,956 115,364 87,950
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 159,995 146,288 230,244 171,989
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 167,453 200,008 237,702 206,861
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 302,265 302,265 302,265 302,265
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 889,371 889,371 889,371 889,371
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 482,250 482,250 482,250 482,250
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 140,548 140,548 140,548 140,548
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 196,292 196,292 196,292 196,292
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 182,361 182,361 182,361 182,361
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 400,356 400,356 400,356 400,356
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,022,652 1,022,652 1,022,652 1,022,652
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 291,075 291,075 291,075 291,075
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 206,566 206,566 206,566 206,566
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,701 82,701 82,701 82,701
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm
17.12 (INCLUYE ACCESORIOS Y GRIFERÍA) UN ###p 249,797 249,797 249,797 249,797
i
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60
17.13 UN ###o 367,545 367,545 367,545 367,545
cm (INCLUYE ACCESORIOS Y GRIFERÍA)
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,384 8,384 8,384 8,384
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,102 3,102 3,102 3,102
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,200 11,200 11,200 11,200
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,393 42,393 42,393 42,393
18.5 CARBURO SOBRE PAÑETES M2 ### 5,869 5,869 5,869 5,869
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 65,619 65,619 65,619 65,619
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,496 3,496 3,496 3,496
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,785 2,785 2,785 2,785
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,007 14,007 14,007 14,007
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,053 4,053 4,053 4,053
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,767 14,767 14,767 14,767
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,752 5,752 5,752 5,752
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,551 6,551 6,551 6,551
18.14 ESTUCO M2 ### 7,067 7,067 7,067 7,067
18.15 ESTUCO (LINEAL) ML ### 4,428 4,428 4,428 4,428
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,598 15,598 15,598 15,598
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,678 9,678 9,678 9,678
18.18 LACA PISOS MADERA M2 ### 22,913 22,913 22,913 22,913
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,701 2,701 2,701 2,701
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,197 12,197 12,197 12,197
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,292 3,292 3,292 3,292
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,653 12,653 12,653 12,653
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,119 7,119 7,119 7,119
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,480 4,480 4,480 4,480
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,860 21,860 21,860 21,860
18.26 PINTURA EPÓXICA M2 ### 12,754 12,754 12,754 12,754
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,886 7,886 7,886 7,886
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,051,426 6,051,426 6,051,426 6,051,426
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA
19.2 MOVILIZAR (PAR) UN ### 10,691,949 10,691,949 10,691,949 10,691,949
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,798,192 2,798,192 2,798,192 2,798,192
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ###
i 9,144,450 9,144,450 9,144,450 9,144,450
p
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ###i 8,563,030 8,563,030 8,563,030 8,563,030
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ###o 2,701 2,701 2,701 2,701
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 859,259 859,259 859,259 859,259
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 85,789 85,789 85,789 85,789
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,554,250 1,554,454 1,554,648 1,554,466
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 675,763 680,489 684,952 680,751
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 113,784 113,784 113,784 113,784
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,185,562 1,185,562 1,185,562 1,185,562
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 148,671 148,671 148,671 148,671
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,373,165 1,373,165 1,373,165 1,373,165
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 957,145 957,145 957,145 957,145
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,545 62,545 62,545 62,545
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 112,953 112,953 112,953 112,953
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 266,630 266,630 266,630 266,630
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 266,623 266,623 266,623 266,623
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 428,017 428,017 428,017 428,017
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 113,001 113,001 113,001 113,001
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 113,001 113,001 113,001 113,001
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 266,630 266,630 266,630 266,630
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 266,630 266,630 266,630 266,630
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 428,017 428,017 428,017 428,017
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 430,588 430,588 430,588 430,588
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 698,576 698,576 698,576 698,576
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,120,970 1,120,970 1,120,970 1,120,970
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 69,283 69,283 69,283 69,283
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 360,469 360,469 360,469 360,469
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 403,378 403,378 403,378 403,378
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,116,855 1,116,855 1,116,855 1,116,855
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 65,331 65,466 65,594 65,473
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 326,867 326,867 326,867 326,867
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 49,684 49,684 49,684 49,684
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ###
i 70,234 70,234 70,234 70,234
p
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ###i 101,316 101,316 101,316 101,316
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ###o 155,506 155,506 155,506 155,506
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 249,851 249,851 249,851 249,851
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 362,989 362,989 362,989 362,989
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 459,213 459,213 459,213 459,213
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 603,739 603,739 603,739 603,739
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 830,148 830,148 830,148 830,148
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 72,620 73,326 73,993 73,365
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 85,984 86,690 87,357 86,729
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 56,001 58,092 60,067 58,208
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 60,303 62,288 64,163 62,399
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 60,592 62,540 64,379 62,648
5.6 BORDE SEPARADOR VERDE A-170 ML ### 251,887 252,289 252,669 252,312
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,431 18,682 18,919 18,696
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,088 41,562 42,954 41,644
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 83,098 83,313 83,516 83,325
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 556,086 560,885 565,418 561,152
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
5.11 LOSETA PREFABRICADA A-40 M2 ###
i 63,451 64,372 65,241 64,423
p
5.12 LOSETA PREFABRICADA A-60 M2 ###i 91,252 92,172 93,042 92,224
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ###o 33,239 34,033 34,782 34,077
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 53,436 55,043 56,561 55,132
5.15 SARDINEL PREFABRICADO A-10 ML ### 99,223 103,219 107,800 104,027
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,605 61,162 61,688 61,193
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 201,213 202,158 203,051 202,211
6.2 BANCA EN CONCRETO M-30 UN ### 659,769 661,092 662,342 661,166
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 212,868 213,068 213,257 213,079
6.4 BOLARDO M-60 CONCRETO UN ### 160,731 161,865 162,936 161,928
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 162,599 163,733 164,804 163,796
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 190,529 191,728 192,861 191,795
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 58,352 58,892 59,403 58,922
6.8 BORDILLO PREFABRICADO A-80 ML ### 67,206 67,811 68,383 67,845
6.9 CANECA M-120 UN ### 308,475 308,610 308,738 308,617
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 813,833 814,400 814,936 814,432
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,336,230 3,336,608 3,336,965 3,336,629
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,431,994 3,432,372 3,432,729 3,432,393
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 480,038 480,438 480,816 480,460
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 636,073 637,672 639,183 637,761
6.15 BANCA EN MADERA M-50 UN ### 528,344 528,344 528,344 528,344
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 245,617 246,184 246,719 246,215
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 568,423 568,761 569,081 568,780
6.18 POSTE HISTÓRICO M-131 UN ### 6,342,007 6,344,842 6,347,520 6,345,000
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,987 3,987 3,987 3,987
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,946 42,946 42,946 42,946
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 310,272 310,473 310,663 310,484
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 488,772 489,572 490,327 489,616
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 232,900 233,101 233,291 233,112
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 247,268 247,469 247,659 247,480
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 258,148 258,349 258,539 258,360
7.8 TACHAS REFLECTIVAS UN ### 13,409 13,409 13,409 13,409
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,317 14,317 14,317 14,317
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 116,349 116,349 116,349 116,349
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
p
i
o
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS p INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.1 201 P DISTANCIA DE 5KM)
M3 ### 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.2 201 P DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.3 200.1 DISTANCIA DE 5KM) HA ### 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.4 200.2 UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA
1.5 201.7 DE 5KM) M3 ### 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES
M3-KM### 1,318 1,318 1,318 1,318
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,235 14,235 14,235 14,235
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,138 19,138 19,138 19,138
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA
4.38 *** 100 KN) M2 ### 22,930 22,930 22,930 22,930
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA
4.39 *** 165 KN)
M2 ### 29,450 29,450 29,450 29,450
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y
4.40 *** M2 ###p 7,178 7,178 7,178 7,178
SEPARACIÓN) i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y o
4.41 *** SEPARACIÓN) M2 ### 8,174 8,174 8,174 8,174
4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,063 6,063 6,063 6,063
4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,111 9,111 9,111 9,111
4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,437 7,437 7,437 7,437
4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,111 9,111 9,111 9,111
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
CONSTRUCCIÓN
APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,993,293 1,977,624 2,002,067 2,011,083 1,992,039
1.2 CAMPAMENTO 9 M2 UN ### 1,163,807 1,155,972 1,168,194 1,172,701 1,163,180
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,201 14,201 14,201 14,201 14,201
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,920 15,920 15,920 15,920 15,920
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,409 18,409 18,409 18,409 18,409
1.6 CERCA EN TABLA H=2.30 M ML ### 66,135 66,135 66,135 66,135 66,135
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,230 46,063 46,324 46,417 46,217
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,294 21,127 21,388 21,481 21,281
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 908,192 905,626 909,725 911,853 907,860
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,478 10,478 10,478 10,478 10,478
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,782 3,782 3,782 3,782 3,782
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,707,298 2,707,298 2,707,298 2,707,298 2,707,298
1.44 RED TELEFÓNICA PROVISIONAL UN ### 250,360 250,360 250,360 250,360 250,360
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 83,359 67,938 93,639 114,200 71,365
2.2 BASE ARENA CEMENTO 1:20 M3 ### 186,539 170,523 195,509 202,556 185,258
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,313 22,313 22,313 22,313 22,313
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 620,507 604,010 629,744 639,043 619,187
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 620,878 603,916 630,375 639,810 619,520
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 578,064 562,181 586,957 595,791 576,793
2.9 PILOTE DE MADERA D=20 CM ML ### 49,774 49,774 49,774 49,774 49,774
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM) ML ### 153,516 153,516 153,516 153,516 153,516
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 DISTANCIA MENOR DE 5 KM) ML ### 191,768 191,768 191,768 191,768 191,768
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 DISTANCIA MENOR DE 5 KM) ML ### 238,026 238,026 238,026 238,026 238,026
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 DISTANCIA MENOR DE 5 KM) ML ### 300,296 300,296 300,296 300,296 300,296
2.14 PILOTE HINCADO 25X25 ML ### 103,494 102,351 104,134 104,757 103,403
2.15 PILOTE HINCADO 30X30 ML ### 127,413 125,756 128,340 129,244 127,280
2.16 DADOS EN CONCRETO 3500PSI M3 ### 563,915 548,032 572,808 581,642 562,644
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.17 DE 5 KM) ML ### 91,875 91,875 91,875 91,875 91,875
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 961,363 956,388 964,148 966,480 960,965
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,554 42,554 42,554 42,554 42,554
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 56,192 56,192 56,192 56,192 56,192
4.3 COLUMNAS 3500 PSI M3 ### 785,155 769,273 794,048 802,883 783,884
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 247,353 233,352 247,236 254,667 244,862
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI M2 ### 96,721 95,179 97,584 98,442 96,597
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4.6 REFUERZO, CONCRETO DE 3500 PSI
M2 ### 114,027 112,176 115,063 116,092 113,879
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 126,389 123,922 127,771 129,143 126,192
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 133,326 130,705 134,794 136,252 133,116
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 152,396 149,158 154,210 156,011 152,137
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 169,349 165,648 171,421 173,480 169,053
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 187,857 183,694 190,188 192,504 187,524
4.12 ENTREPISO VIGUETA PLACA M2 ### 99,914 99,639 100,068 100,209 99,892
4.13 ESCALERA MACIZA 3500 PSI M3 ### 934,298 918,416 943,191 952,026 933,027
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ###
i 95,655 95,456 95,766 95,854 95,639
p
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### i 77,254 75,666 78,143 79,027 77,127
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### o 86,648 84,705 87,736 88,817 86,493
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 100,696 98,260 102,060 103,415 100,501
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 683,910 668,027 692,803 701,637 682,639
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,795 48,311 49,065 49,329 48,756
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 271,493 264,400 275,465 279,410 270,925
4.21 ACERO FIGURADO 37000 PSI KG ### 4,226 4,226 4,226 4,226 4,226
4.22 ACERO FIGURADO 60000 PSI KG ### 4,432 4,432 4,432 4,432 4,432
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,208 6,208 6,208 6,208 6,208
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 831,169 815,287 840,062 848,896 829,898
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 752,942 735,555 762,677 772,352 751,551
4.26 VIGA AÉREA 3500 PSI M3 ### 825,234 809,352 834,127 842,962 823,963
4.27 VIGA CINTA 3500 PSI M3 ### 805,159 789,276 814,052 822,886 803,888
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,015,746 999,863 1,024,639 1,033,473 1,014,475
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 297,843 279,910 307,884 318,202 296,408
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,215 28,793 29,451 29,670 29,181
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,608 49,186 49,844 50,064 49,574
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,184 35,085 35,240 35,284 35,176
5.4 ARCOS EN LADRILLO PRENSADO ML ### 164,849 164,650 164,960 165,048 164,833
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,578 43,095 43,849 44,112 43,539
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,900 26,701 27,012 27,099 26,884
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 99,808 99,410 100,031 100,206 99,776
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 88,921 87,309 89,823 90,702 88,792
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 92,176 92,176 92,176 92,176 92,176
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 54,012 54,012 54,012 54,012 54,012
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 88,761 88,761 88,761 88,761 88,761
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,304 52,304 52,304 52,304 52,304
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 102,987 102,987 102,987 102,987 102,987
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,738 60,738 60,738 60,738 60,738
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 114,574 114,574 114,574 114,574 114,574
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,532 66,532 66,532 66,532 66,532
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 40,926 40,726 41,038 41,126 40,910
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,777 24,677 24,833 24,877 24,769
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 53,463 53,329 53,537 53,596 53,452
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ###
i 32,111 32,044 32,148 32,177 32,105
p
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### i 60,158 60,025 60,233 60,291 60,147
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### o 36,132 36,065 36,169 36,198 36,126
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 99,613 98,946 99,986 100,280 99,560
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,886 58,552 59,072 59,219 58,859
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,547 37,414 37,622 37,681 37,537
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,754 22,688 22,792 22,821 22,749
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 74,731 74,464 74,880 74,997 74,710
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,027 44,893 45,101 45,160 45,016
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 88,533 88,334 88,644 88,732 88,517
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,605 53,505 53,661 53,704 53,597
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 183,281 182,348 183,804 184,214 183,206
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 110,034 109,568 110,296 110,501 109,997
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 90,585 90,106 90,854 91,065 90,547
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,631 54,391 54,765 54,871 54,612
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 47,123 46,825 47,290 47,421 47,099
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,660 28,511 28,744 28,809 28,648
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,998 33,864 34,072 34,131 33,987
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,705 20,638 20,742 20,771 20,699
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 51,369 51,102 51,518 51,635 51,347
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,465 31,332 31,540 31,599 31,455
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 99,203 98,803 99,427 99,603 99,171
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,350 60,150 60,462 60,550 60,334
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 72,393 72,127 72,543 72,660 72,372
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,687 43,554 43,762 43,821 43,677
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 151,972 151,039 152,494 152,905 151,897
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 92,390 91,924 92,652 92,857 92,353
5.47 REMATES LADRILLO PRENSADO ML ### 31,973 31,873 32,029 32,072 31,965
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,591 36,246 36,785 36,937 36,564
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,849 61,389 62,107 62,310 61,813
5.50 LAVADA DE FACHADA M2 ### 5,255 5,255 5,255 5,255 5,255
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,971 49,549 50,207 50,427 49,937
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,620 10,620 10,620 10,620 10,620
5.53 ANCLAJE 3/8" L=30CM UN ### 14,022 14,022 14,022 14,022 14,022
5.54 ANCLAJE 1/2" L=50CM UN ### 18,321 18,321 18,321 18,321 18,321
5.55 ANCLAJE 5/8" L=70CM UN ### 25,630 25,630 25,630 25,630 25,630
5.56 ANCLAJE 3/4" L=70CM UN ### 38,195 38,195 38,195 38,195 38,195
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
5.57 ANCLAJE 1" L= 70CM UN ###
i 4,769 4,649 4,835 4,903 4,759
p
i
6 PAÑETES, REVOQUES Y REPELLOS o
6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,191 16,191 16,191 16,191 16,191
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,696 5,597 5,752 5,796 5,688
6.3 FILOS O DILATACIONES S/MURO ML ### 6,882 6,783 6,938 6,982 6,874
6.4 GOTERA EN MORTERO 1:4 ML ### 8,170 8,071 8,226 8,270 8,162
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,889 6,889 6,889 6,889 6,889
6.6 MALLA BAJO ENTRAMADO M2 ### 13,752 13,752 13,752 13,752 13,752
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,228 23,892 24,416 24,564 24,201
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,708 14,540 14,802 14,876 14,695
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 20,995 20,715 21,152 21,275 20,973
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,781 12,641 12,860 12,921 12,770
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 20,337 20,001 20,525 20,673 20,310
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,452 12,285 12,546 12,620 12,439
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 20,995 20,715 21,152 21,275 20,973
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,781 12,641 12,860 12,921 12,770
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 21,612 21,372 21,746 21,851 21,592
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,089 12,969 13,156 13,208 13,079
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,478 17,265 17,598 17,692 17,461
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,735 10,628 10,794 10,841 10,726
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,977 16,721 17,121 17,233 16,957
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,484 10,356 10,556 10,612 10,474
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 21,773 21,493 21,930 22,053 21,751
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,150 13,010 13,229 13,290 13,139
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,115 20,780 21,303 21,451 21,089
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,822 12,654 12,916 12,989 12,808
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,588 17,332 17,731 17,843 17,567
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,771 10,643 10,843 10,899 10,761
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,005 21,669 22,193 22,341 21,978
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,671 13,503 13,765 13,838 13,657
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 26,658 26,258 26,882 27,058 26,626
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE) M2 ### 82,471 81,665 82,922 83,361 82,406
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,863 55,863 55,863 55,863 55,863
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ###
i 22,299 22,299 22,299 22,299 22,299
p
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### i 35,002 35,002 35,002 35,002 35,002
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### o 81,595 81,595 81,595 81,595 81,595
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,918 63,918 63,918 63,918 63,918
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,223 37,223 37,223 37,223 37,223
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 85,508 85,508 85,508 85,508 85,508
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 102,083 102,083 102,083 102,083 102,083
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 149,969 149,969 149,969 149,969 149,969
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 59,325 59,325 59,325 59,325 59,325
7.13 CANAL PVC AMAZONAS ML ### 82,483 82,483 82,483 82,483 82,483
7.14 CANAL PVC RAINGO ML ### 75,008 75,008 75,008 75,008 75,008
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 132,933 132,933 132,933 132,933 132,933
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 77,610 77,610 77,610 77,610 77,610
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 57,036 57,036 57,036 57,036 57,036
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,586 32,586 32,586 32,586 32,586
7.19 TEJA DE BARRO M2 ### 59,396 58,898 59,674 59,893 59,356
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 47,543 47,543 47,543 47,543 47,543
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,592 43,592 43,592 43,592 43,592
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,848 36,848 36,848 36,848 36,848
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 36,073 36,073 36,073 36,073 36,073
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 36,343 36,343 36,343 36,343 36,343
7.25 TEJA TERMOACÚSTICA M2 ### 51,090 51,090 51,090 51,090 51,090
7.26 TEJA PLÁSTICA No.6 M2 ### 44,933 44,933 44,933 44,933 44,933
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 82,144 82,144 82,144 82,144 82,144
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 151,567 151,567 151,567 151,567 151,567
7.29 TEJA SIN TRASLAPO M2 ### 68,178 68,178 68,178 68,178 68,178
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,921 42,921 42,921 42,921 42,921
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,602 33,602 33,602 33,602 33,602
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM)
M2 ### 58,479 58,479 58,479 58,479 58,479
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,187 20,187 20,187 20,187 20,187
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,262 24,262 24,262 24,262 24,262
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,271 26,271 26,271 26,271 26,271
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,795 33,795 33,795 33,795 33,795
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,338 22,338 22,338 22,338 22,338
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,574 52,574 52,574 52,574 52,574
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 358,894 358,894 358,894 358,894 358,894
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ###
i 412,206 412,206 412,206 412,206 412,206
p
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### i 273,114 273,114 273,114 273,114 273,114
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### o 291,690 291,690 291,690 291,690 291,690
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 429,045 412,481 438,320 447,353 427,720
8.2 CONCRETO 3500 PSI M3 ### 374,515 359,095 383,149 391,726 373,281
8.3 CONCRETO 3000 PSI M3 ### 372,561 356,544 381,529 390,557 371,279
8.4 CONCRETO 2500 PSI M3 ### 325,857 309,740 334,881 343,670 324,567
8.5 CONCRETO 2000 PSI M3 ### 302,933 286,220 312,292 321,626 301,596
8.6 CONCRETO 1500 PSI M3 ### 274,057 256,647 283,806 293,823 272,664
8.7 MORTERO SECO 1:10 M3 ### 231,178 217,450 238,866 244,907 230,080
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 443,899 430,568 451,364 457,229 442,832
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 412,579 396,590 421,533 428,568 411,300
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 474,483 459,529 482,857 489,437 473,287
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 702,223 687,269 710,597 717,177 701,027
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 124,282 124,282 124,282 124,282 124,282
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,931 3,832 3,987 4,031 3,923
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 139,146 139,146 139,146 139,146 139,146
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 170,321 170,321 170,321 170,321 170,321
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 247,268 247,268 247,268 247,268 247,268
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 275,197 275,197 275,197 275,197 275,197
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 303,158 303,158 303,158 303,158 303,158
9.8 HOJA PUERTA FORTEC 0.81 UN ### 201,285 201,285 201,285 201,285 201,285
9.9 HOJA PUERTA FORTEC 0.91 UN ### 228,179 228,179 228,179 228,179 228,179
9.10 HOJA PUERTA FORTEC 1.50 UN ### 335,752 335,752 335,752 335,752 335,752
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 127,329 127,329 127,329 127,329 127,329
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 169,013 169,013 169,013 169,013 169,013
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 187,839 187,839 187,839 187,839 187,839
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 478,287 478,287 478,287 478,287 478,287
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,490 42,490 42,490 42,490 42,490
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,506 26,506 26,506 26,506 26,506
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 100,459 100,459 100,459 100,459 100,459
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 122,380 122,380 122,380 122,380 122,380
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 95,083 95,083 95,083 95,083 95,083
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ###
i 29,517 29,517 29,517 29,517 29,517
p
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### i 29,517 29,517 29,517 29,517 29,517
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### o 27,984 27,984 27,984 27,984 27,984
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,814 42,814 42,814 42,814 42,814
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 53,000 53,000 53,000 53,000 53,000
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,865 63,865 63,865 63,865 63,865
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 76,767 76,767 76,767 76,767 76,767
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 361,318 361,318 361,318 361,318 361,318
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 252,669 252,669 252,669 252,669 252,669
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,987 33,987 33,987 33,987 33,987
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 43,493 43,493 43,493 43,493 43,493
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 53,000 53,000 53,000 53,000 53,000
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 66,582 66,582 66,582 66,582 66,582
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 76,784 76,784 76,784 76,784 76,784
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 213,355 213,355 213,355 213,355 213,355
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO) ML ### 81,329 81,329 81,329 81,329 81,329
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 145,691 145,691 145,691 145,691 145,691
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 137,835 137,835 137,835 137,835 137,835
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 90,498 90,498 90,498 90,498 90,498
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 213,212 213,212 213,212 213,212 213,212
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 111,105 111,105 111,105 111,105 111,105
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,668 6,668 6,668 6,668 6,668
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 100,487 100,487 100,487 100,487 100,487
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 122,087 122,087 122,087 122,087 122,087
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,371 41,371 41,371 41,371 41,371
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 543,925 543,925 543,925 543,925 543,925
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 195,695 195,695 195,695 195,695 195,695
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 219,759 219,759 219,759 219,759 219,759
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS)
M2 ### 496,035 496,035 496,035 496,035 496,035
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 129,642 129,642 129,642 129,642 129,642
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 396,624 396,624 396,624 396,624 396,624
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,091 6,091 6,091 6,091 6,091
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 279,033 279,033 279,033 279,033 279,033
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ###
i 123,388 123,388 123,388 123,388 123,388
p
10.21 REJILLA PISO 0.30 M M2 ### i 87,020 87,020 87,020 87,020 87,020
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### o 89,853 89,853 89,853 89,853 89,853
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,674 10,674 10,674 10,674 10,674
SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE,
10.24 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,840 11,840 11,840 11,840 11,840
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS,
10.25 VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA
KG ### 9,418 9,418 9,418 9,418 9,418
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 61,822 61,822 61,822 61,822 61,822
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 367,044 367,044 367,044 367,044 367,044
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 58,317 58,317 58,317 58,317 58,317
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 69,019 69,019 69,019 69,019 69,019
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 76,646 76,646 76,646 76,646 76,646
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 90,253 90,253 90,253 90,253 90,253
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,846 54,846 54,846 54,846 54,846
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 62,500 62,500 62,500 62,500 62,500
12.8 STRIP TELEFÓNICO 10 PARES UN ### 144,362 144,362 144,362 144,362 144,362
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 56,300 56,300 56,300 56,300 56,300
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 129,368 129,368 129,368 129,368 129,368
12.11 SALIDA T.V PVC COMPLETA. UN ### 77,389 77,389 77,389 77,389 77,389
12.12 SALIDA BIFÁSICA C.N. UN ### 45,884 45,884 45,884 45,884 45,884
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 96,752 96,752 96,752 96,752 96,752
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 413,152 413,152 413,152 413,152 413,152
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 550,227 550,227 550,227 550,227 550,227
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,563 3,563 3,563 3,563 3,563
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,704 4,704 4,704 4,704 4,704
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,318 7,318 7,318 7,318 7,318
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,091 13,091 13,091 13,091 13,091
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 275,025 275,025 275,025 275,025 275,025
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 77,735 77,735 77,735 77,735 77,735
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 105,191 105,191 105,191 105,191 105,191
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ###
i 43,000 43,000 43,000 43,000 43,000
p
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### i 1,410,512 1,410,512 1,410,512 1,410,512 1,410,512
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### o 1,045,355 1,045,355 1,045,355 1,045,355 1,045,355
12.26 POSTE METÁLICO 6M UN ### 1,305,919 1,305,919 1,305,919 1,305,919 1,305,919
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 607,437 607,437 607,437 607,437 607,437
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 110,992 110,992 110,992 110,992 110,992
12.29 LUMINARIA 70W SODIO UN ### 509,614 509,614 509,614 509,614 509,614
12.30 LUMINARIA 150W SODIO UN ### 637,527 637,527 637,527 637,527 637,527
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,683,597 1,683,597 1,683,597 1,683,597 1,683,597
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,239,857 1,239,857 1,239,857 1,239,857 1,239,857
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 39,912 39,337 40,235 40,488 39,866
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,612 39,037 39,934 40,187 39,566
13.3 ALISTADO PARA LISTÓN M2 ### 14,811 14,696 14,875 14,926 14,802
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 27,885 26,735 28,529 29,035 27,793
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 85,480 84,329 86,124 86,630 85,388
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,333 25,999 26,520 26,707 26,306
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 55,352 53,740 56,254 57,133 55,223
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 76,137 73,559 77,581 78,988 75,931
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,738 30,738 30,738 30,738 30,738
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,264 23,264 23,264 23,264 23,264
13.11 PERMA PLY 2 CAPAS M2 ### 27,311 27,311 27,311 27,311 27,311
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 44,805 43,354 45,617 46,408 44,689
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 52,363 50,591 53,356 54,323 52,222
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 75,594 72,854 77,128 78,622 75,374
13.15 TRITURADO FINO 1/2 M3 ### 88,892 75,443 96,423 102,342 87,817
13.16 TRITURADO GRUESO 3/4 M3 ### 95,863 81,338 104,379 114,284 94,192
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,889 57,659 58,018 58,119 57,871
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,616 34,501 34,681 34,732 34,607
14.3 ADOQUÍN CONCRETO 6CM M2 ### 66,026 65,451 66,348 66,601 65,980
14.4 ADOQUÍN CONCRETO 8CM M2 ### 69,426 68,851 69,748 70,001 69,380
14.5 ADOQUÍN GRES PEATONAL M2 ### 73,730 73,155 74,052 74,305 73,684
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO M2 ### 76,328 76,098 76,457 76,558 76,310
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
14.7 GRAVILLA PARA GRADAS ML ###
i 37,513 37,271 37,649 37,755 37,494
p
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### i 165,900 164,865 166,480 166,936 165,818
14.9 ACABADO EN GRAVILLA LAVADA M2 ### o 46,639 46,040 46,975 47,239 46,591
14.10 GUARDAESCOBA EN GRANITO ML ### 44,472 44,472 44,472 44,472 44,472
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,170 9,928 10,306 10,412 10,150
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,522 9,522 9,522 9,522 9,522
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,780 12,780 12,780 12,780 12,780
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,689 10,689 10,689 10,689 10,689
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,890 17,890 17,890 17,890 17,890
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,832 34,832 34,832 34,832 34,832
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,364 9,364 9,364 9,364 9,364
14.18 LISTÓN M.H. AMARILLO M2 ### 75,520 75,520 75,520 75,520 75,520
14.19 PASO ESCALERA GRANITO ML ### 120,018 119,212 120,468 120,823 119,953
14.20 PIRLANES ALUMINIO ML ### 7,659 7,659 7,659 7,659 7,659
14.21 PIRLANES LADRILLO ML ### 32,338 32,139 32,449 32,537 32,322
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 46,591 46,591 46,591 46,591 46,591
14.23 PISO VINILO TRÁFICO PESADO M2 ### 54,136 54,136 54,136 54,136 54,136
14.24 PULIDA LACADA PISO MADERA M2 ### 49,938 49,938 49,938 49,938 49,938
14.25 TABLETA DE GRES 25X25 M2 ### 50,209 49,979 50,338 50,439 50,191
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,358 56,128 56,487 56,588 56,340
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,115 11,115 11,115 11,115 11,115
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 50,069 49,771 50,237 50,368 50,046
14.29 JABONERA PORCELANA ACUARIO UN ### 20,932 20,932 20,932 20,932 20,932
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y
14.30 PERCHA SIMPLE) UN ### 125,232 125,232 125,232 125,232 125,232
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,105 10,105 10,105 10,105 10,105
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,855 22,855 22,855 22,855 22,855
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,677 14,677 14,677 14,677 14,677
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,260 14,260 14,260 14,260 14,260
14.35 REMATES BOCEL ALUMINIO ML ### 8,685 8,685 8,685 8,685 8,685
14.36 REMATES BOCEL PORCELANA ML ### 8,837 8,837 8,837 8,837 8,837
14.37 TAPA REGISTRO 20X20 UN ### 19,368 19,368 19,368 19,368 19,368
14.38 TAPA REGISTRO 6X6 UN ### 17,654 17,654 17,654 17,654 17,654
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,960 18,960 18,960 18,960 18,960
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN
14.40 SITIO M2 ### 21,918 21,918 21,918 21,918 21,918
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 66,167 65,937 66,296 66,397 66,148
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
14.42 MEDIA CAÑA EN GRANITO ML ###
i 78,660 78,660 78,660 78,660 78,660
p
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### i 34,660 34,660 34,660 34,660 34,660
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### o 13,480 13,480 13,480 13,480 13,480
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 103,289 103,289 103,289 103,289 103,289
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 125,038 125,038 125,038 125,038 125,038
15 CIELO RASO
15.1 APLIQUE YESO ML ### 73,910 73,910 73,910 73,910 73,910
15.2 ARMADURA MADERA Y MALLA M2 ### 36,494 36,494 36,494 36,494 36,494
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 56,300 56,300 56,300 56,300 56,300
15.4 CIELO RASO DURACUSTIC M2 ### 69,062 69,062 69,062 69,062 69,062
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,556 51,556 51,556 51,556 51,556
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 95,549 95,549 95,549 95,549 95,549
15.7 CORNISAS YESO ML ### 49,604 49,604 49,604 49,604 49,604
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 105,592 105,592 105,592 105,592 105,592
15.9 MALLA CON VENA M2 ### 13,656 13,656 13,656 13,656 13,656
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 100,493 85,072 110,773 131,334 97,066
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 92,843 78,841 100,682 106,843 91,722
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 120,540 105,120 154,808 161,662 142,815
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 73,265 57,844 83,545 104,106 61,271
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 107,380 91,959 141,648 148,502 129,654
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 117,510 102,089 151,778 158,631 139,784
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 306,507 306,507 306,507 306,507 306,507
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ###
i 903,144 903,144 903,144 903,144 903,144
p
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### i 489,438 489,438 489,438 489,438 489,438
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### o 142,064 142,064 142,064 142,064 142,064
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 198,799 198,799 198,799 198,799 198,799
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 184,640 184,640 184,640 184,640 184,640
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 406,203 406,203 406,203 406,203 406,203
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,038,607 1,038,607 1,038,607 1,038,607 1,038,607
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 295,134 295,134 295,134 295,134 295,134
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 209,163 209,163 209,163 209,163 209,163
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 83,349 83,349 83,349 83,349 83,349
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE
17.12 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 253,181 253,181 253,181 253,181 253,181
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE
17.13 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 372,856 372,856 372,856 372,856 372,856
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,445 8,445 8,445 8,445 8,445
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,130 3,130 3,130 3,130 3,130
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,254 11,254 11,254 11,254 11,254
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,768 42,768 42,768 42,768 42,768
18.5 CARBURO SOBRE PAÑETES M2 ### 5,899 5,899 5,899 5,899 5,899
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 66,606 66,606 66,606 66,606 66,606
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,509 3,509 3,509 3,509 3,509
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,808 2,808 2,808 2,808 2,808
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,101 14,101 14,101 14,101 14,101
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,084 4,084 4,084 4,084 4,084
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,869 14,869 14,869 14,869 14,869
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,817 5,817 5,817 5,817 5,817
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,620 6,620 6,620 6,620 6,620
18.14 ESTUCO M2 ### 7,094 7,094 7,094 7,094 7,094
18.15 ESTUCO (LINEAL) ML ### 4,442 4,442 4,442 4,442 4,442
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,695 15,695 15,695 15,695 15,695
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,727 9,727 9,727 9,727 9,727
18.18 LACA PISOS MADERA M2 ### 23,008 23,008 23,008 23,008 23,008
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,716 2,716 2,716 2,716 2,716
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,326 12,326 12,326 12,326 12,326
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,326 3,326 3,326 3,326 3,326
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,743 12,743 12,743 12,743 12,743
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ###
i 7,165 7,165 7,165 7,165 7,165
p
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### i 4,503 4,503 4,503 4,503 4,503
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### o 22,078 22,078 22,078 22,078 22,078
18.26 PINTURA EPÓXICA M2 ### 12,822 12,822 12,822 12,822 12,822
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,920 7,920 7,920 7,920 7,920
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,149,399 6,149,399 6,149,399 6,149,399 6,149,399
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR)
UN ### 10,865,035 10,865,035 10,865,035 10,865,035 10,865,035
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,843,411 2,843,411 2,843,411 2,843,411 2,843,411
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,292,411 9,292,411 9,292,411 9,292,411 9,292,411
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,702,001 8,702,001 8,702,001 8,702,001 8,702,001
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,716 2,716 2,716 2,716 2,716
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 872,721 872,721 872,721 872,721 872,721
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 87,194 87,194 87,194 87,194 87,194
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,578,948 1,578,783 1,579,041 1,579,132 1,578,935
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 678,074 674,070 680,316 682,573 677,754
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 115,579 115,579 115,579 115,579 115,579
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,204,880 1,204,880 1,204,880 1,204,880 1,204,880
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 151,038 151,038 151,038 151,038 151,038
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,395,554 1,395,554 1,395,554 1,395,554 1,395,554
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 972,702 972,702 972,702 972,702 972,702
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,754 62,754 62,754 62,754 62,754
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 114,735 114,735 114,735 114,735 114,735
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 270,907 270,907 270,907 270,907 270,907
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 270,901 270,901 270,901 270,901 270,901
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 434,913 434,913 434,913 434,913 434,913
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 114,784 114,784 114,784 114,784 114,784
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 114,784 114,784 114,784 114,784 114,784
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 270,907 270,907 270,907 270,907 270,907
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 270,907 270,907 270,907 270,907 270,907
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 434,913 434,913 434,913 434,913 434,913
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 436,970 436,970 436,970 436,970 436,970
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 709,345 709,345 709,345 709,345 709,345
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,138,400 1,138,400 1,138,400 1,138,400 1,138,400
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 70,347 70,347 70,347 70,347 70,347
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 365,703 365,703 365,703 365,703 365,703
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 409,760 409,760 409,760 409,760 409,760
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,134,274 1,134,274 1,134,274 1,134,274 1,134,274
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 66,218 66,084 66,292 66,351 66,207
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 331,551 331,551 331,551 331,551 331,551
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 50,432 50,432 50,432 50,432 50,432
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 71,318 71,318 71,318 71,318 71,318
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 102,909 102,909 102,909 102,909 102,909
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 157,963 157,963 157,963 157,963 157,963
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 253,852 253,852 253,852 253,852 253,852
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 368,499 368,499 368,499 368,499 368,499
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 466,276 466,276 466,276 466,276 466,276
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 613,060 613,060 613,060 613,060 613,060
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 843,176 843,176 843,176 843,176 843,176
4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 657,379 647,769 662,760 668,177 656,610
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO
4.2 E=1.5CM Y CAÑUELA) ML ### 649,201 641,874 653,304 656,528 648,615
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE
4.3 ARO Y TAPA HF) UN ### 706,720 700,314 710,308 713,919 706,208
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 779,743 767,731 786,469 793,240 778,782
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO
4.5 E=1.5CM Y CAÑUELA) ML ### 921,968 911,649 927,746 932,286 921,142
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.6 (INCLUYE ARO Y TAPA HF) UN ### 813,573 804,763 818,505 823,470 812,867
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 991,143 986,379 993,809 996,181 990,759
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,426,641 1,412,953 1,434,302 1,441,471 1,425,542
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,940,173 1,914,871 1,954,341 1,968,420 1,938,149
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,562,148 2,520,089 2,585,699 2,609,102 2,558,783
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,845,423 1,845,423 1,845,423 1,845,423 1,845,423
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,903,472 3,903,472 3,903,472 3,903,472 3,903,472
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE
4.13 PAÑETE INTERNO Y DEMOLICIÓN) UN ### 139,106 138,807 139,273 139,405 139,082
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 72,959 72,262 73,349 73,655 72,903
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 86,583 85,886 86,973 87,279 86,527
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 53,235 51,543 54,182 55,105 53,099
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###
i 58,139 56,457 59,080 60,028 58,004
p
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### i 58,344 56,725 59,250 60,151 58,214
5.6 BORDE SEPARADOR VERDE A-170 ML ### o 255,010 254,711 255,177 255,309 254,986
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,117 17,914 18,231 18,342 18,101
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 38,125 36,932 38,792 39,443 38,029
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 83,721 83,562 83,811 83,881 83,709
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 555,539 551,392 557,861 559,686 555,207
5.11 LOSETA PREFABRICADA A-40 M2 ### 62,384 61,699 62,767 63,068 62,329
5.12 LOSETA PREFABRICADA A-60 M2 ### 90,727 90,043 91,111 91,412 90,673
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 32,410 31,737 32,786 33,166 32,356
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 51,698 50,337 52,461 53,228 51,589
5.15 SARDINEL PREFABRICADO A-10 ML ### 95,114 93,164 99,184 100,050 97,689
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,229 59,815 60,461 60,643 60,196
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 202,618 201,817 203,067 203,518 202,554
6.2 BANCA EN CONCRETO M-30 UN ### 667,835 666,714 668,463 669,095 667,745
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 215,441 215,274 215,535 215,628 215,428
6.4 BOLARDO M-60 CONCRETO UN ### 161,095 160,134 161,634 162,175 161,019
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 162,963 162,002 163,501 164,043 162,886
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 191,234 190,231 191,795 192,355 191,154
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 58,471 57,938 58,770 59,004 58,428
6.8 BORDILLO PREFABRICADO A-80 ML ### 67,686 67,089 68,020 68,283 67,638
6.9 CANECA M-120 UN ### 313,083 312,949 313,157 313,216 313,072
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 825,257 824,776 825,526 825,797 825,219
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,388,953 3,388,632 3,389,132 3,389,313 3,388,927
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,486,286 3,485,965 3,486,465 3,486,646 3,486,260
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 486,956 486,622 487,143 487,330 486,929
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 643,645 642,308 644,394 645,140 643,538
6.15 BANCA EN MADERA M-50 UN ### 536,457 536,457 536,457 536,457 536,457
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 247,997 247,517 248,266 248,537 247,959
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 577,115 576,782 577,302 577,448 577,088
6.18 POSTE HISTÓRICO M-131 UN ### 6,439,321 6,436,918 6,440,666 6,442,020 6,439,128
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,050 4,050 4,050 4,050 4,050
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,489 43,489 43,489 43,489 43,489
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
7.3 SEÑAL DOBLE DE CICLORUTA UN ###
i 314,505 314,355 314,589 314,655 314,493
p
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### i 494,568 493,900 494,942 495,316 494,515
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### o 235,365 235,216 235,449 235,515 235,353
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 249,968 249,819 250,052 250,118 249,956
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 261,026 260,877 261,110 261,176 261,014
7.8 TACHAS REFLECTIVAS UN ### 13,594 13,594 13,594 13,594 13,594
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,517 14,517 14,517 14,517 14,517
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 118,130 118,130 118,130 118,130 118,130
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS p INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.2 201 P UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.3 200.1 UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.5 201.7 UNA DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,412 19,412 19,412 19,412 19,412
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN)
M2 ### 23,266 23,266 23,266 23,266 23,266
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 29,891 29,891 29,891 29,891 29,891
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y
4.40 *** SEPARACIÓN) M2 ### 7,267 7,267 7,267 7,267 7,267
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y
4.41 *** SEPARACIÓN) M2 ### 8,278 8,278 8,278 8,278 8,278
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 355,651 352,009 357,690 359,689 355,360
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 883,015 883,015 883,015 883,015 883,015
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 142,315 127,488 152,200 171,970 130,783
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,432 4,432 4,432 4,432 4,432
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 85,956 85,956 85,956 85,956 85,956
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 130,957 130,957 130,957 130,957 130,957
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 494,998 478,075 504,473 513,702 493,644
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
4.56 682.1 P COLCHONETA RENO M3 ###
i 228,049 215,594 208,675 218,362 222,514
p
4.57 *** TRINCHO EN MADERA M2 ### i 68,016 68,016 68,016 68,016 68,016
o
5 NORMA INV SEÑALIZACIÓN
5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,050 4,050 4,050 4,050 4,050
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,489 43,489 43,489 43,489 43,489
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 83,846 83,846 83,846 83,846 83,846
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 69,754 69,754 69,754 69,754 69,754
5.5 730.1 DEFENSA METÁLICA ML ### 147,031 146,210 147,491 147,852 146,965
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,594 13,594 13,594 13,594 13,594
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
CONSTRUCCIÓN
APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
CONSTRUCCIÓN p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 2,207,609
1.2 CAMPAMENTO 9 M2 UN ### 1,274,729
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,622
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,396
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,937
1.6 CERCA EN TABLA H=2.30 M ML ### 69,481
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 49,766
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 23,470
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 972,973
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,963
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,971
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,855,865
1.44 RED TELEFÓNICA PROVISIONAL UN ### 262,620
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 177,448
2.2 BASE ARENA CEMENTO 1:20 M3 ### 265,066
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 23,437
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 773,124
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 773,205
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 719,579
2.9 PILOTE DE MADERA D=20 CM ML ### 50,335
2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 155,339
2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 195,831
2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 244,798
2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 310,715
2.14 PILOTE HINCADO 25X25 ML ### 114,663
2.15 PILOTE HINCADO 30X30 ML ### 143,600
2.16 DADOS EN CONCRETO 3500PSI M3 ### 705,430
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 93,074
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 44,614
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 59,099
4.3 COLUMNAS 3500 PSI M3 ### 932,619
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 316,329
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.5 PSI M2 ### 113,081
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.6 PSI M2 ### 133,728
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 149,580
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 157,958
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 182,606
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 203,790
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 226,504
4.12 ENTREPISO VIGUETA PLACA M2 ### 106,124
4.13 ESCALERA MACIZA 3500 PSI M3 ### 1,089,403
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 101,490
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 92,109
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 104,640
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 123,053
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ###
i 827,312
p
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### i 53,497
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### o 334,678
4.21 ACERO FIGURADO 37000 PSI KG ### 4,453
4.22 ACERO FIGURADO 60000 PSI KG ### 4,670
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,449
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 976,141
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 908,876
4.26 VIGA AÉREA 3500 PSI M3 ### 970,965
4.27 VIGA CINTA 3500 PSI M3 ### 950,917
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,162,107
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 456,661
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 32,606
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 53,076
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,539
5.4 ARCOS EN LADRILLO PRENSADO ML ### 170,132
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 48,238
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,592
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 106,337
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 104,339
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,785
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,816
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 92,158
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,002
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 107,465
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,978
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 119,775
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 69,133
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 43,366
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,997
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 56,481
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,620
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 63,441
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,773
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 106,922
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ###
i 62,540
p
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### i 39,519
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### o 23,740
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 78,946
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 47,134
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 93,732
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 56,204
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 196,241
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 116,514
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 96,268
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 57,472
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 50,377
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 30,287
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 35,796
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,604
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 54,761
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 33,161
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 105,463
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 63,480
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 76,780
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,917
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 163,116
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 98,015
5.47 REMATES LADRILLO PRENSADO ML ### 33,545
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 39,074
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 65,631
5.50 LAVADA DE FACHADA M2 ### 5,292
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 53,448
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,692
5.53 ANCLAJE 3/8" L=30CM UN ### 14,248
5.54 ANCLAJE 1/2" L=50CM UN ### 18,654
5.55 ANCLAJE 5/8" L=70CM UN ### 26,309
5.56 ANCLAJE 3/4" L=70CM UN ### 39,497
5.57 ANCLAJE 1" L= 70CM UN ### 5,839
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 29,023
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### 92,114
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 58,694
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,174
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,469
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 85,945
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 67,170
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,812
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ###
i 90,102
p
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### i 107,707
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### o 158,572
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 62,190
7.13 CANAL PVC AMAZONAS ML ### 86,163
7.14 CANAL PVC RAINGO ML ### 78,222
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 139,912
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 81,857
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 60,004
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,684
7.19 TEJA DE BARRO M2 ### 63,563
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 50,038
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 45,840
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,310
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 37,543
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,831
7.25 TEJA TERMOACÚSTICA M2 ### 53,543
7.26 TEJA PLÁSTICA No.6 M2 ### 47,003
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 86,426
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 160,094
7.29 TEJA SIN TRASLAPO M2 ### 71,779
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,139
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,725
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 61,149
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,709
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,037
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,222
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,212
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,094
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,451
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 380,467
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 423,505
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 286,853
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 307,131
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 572,464
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
8.2 CONCRETO 3500 PSI M3 ###
i 510,921
p
8.3 CONCRETO 3000 PSI M3 ### i 515,985
8.4 CONCRETO 2500 PSI M3 ### o 459,517
8.5 CONCRETO 2000 PSI M3 ### 445,528
8.6 CONCRETO 1500 PSI M3 ### 428,249
8.7 MORTERO SECO 1:10 M3 ### 301,775
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 522,753
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 480,063
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 542,839
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 784,739
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 130,021
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,506
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 145,014
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 178,128
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 260,990
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 290,616
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 320,274
9.8 HOJA PUERTA FORTEC 0.81 UN ### 212,997
9.9 HOJA PUERTA FORTEC 0.91 UN ### 241,564
9.10 HOJA PUERTA FORTEC 1.50 UN ### 355,830
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 134,439
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 178,717
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 198,714
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 507,232
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,262
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,283
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,596
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 129,571
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 100,576
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,931
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,931
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 29,302
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,715
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 55,535
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 67,075
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ###
i 80,780
p
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### i 382,442
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### o 267,033
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,338
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,436
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 55,535
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 69,961
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 80,166
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 225,234
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 84,532
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 150,105
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 143,623
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 94,270
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 222,807
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,694
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,919
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 103,253
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 127,869
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,551
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 575,228
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 206,127
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 229,944
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 523,641
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 133,723
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 419,905
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,330
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 294,401
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 127,576
10.21 REJILLA PISO 0.30 M M2 ### 90,964
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,699
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,989
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, p
10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ###
i 12,228
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
o
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,656
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
12 INSTALACIONES ELÉCTRICAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
12.1 ACOMETIDA AÉREA 10 M. PVC UN ###
i 385,757
p
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### i 61,304
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### o 72,675
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 80,562
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 95,019
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 57,576
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 65,684
12.8 STRIP TELEFÓNICO 10 PARES UN ### 150,938
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 59,162
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 136,113
12.11 SALIDA T.V PVC COMPLETA. UN ### 81,281
12.12 SALIDA BIFÁSICA C.N. UN ### 48,217
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 101,319
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 432,302
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 576,472
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,735
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,929
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,679
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,726
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 288,726
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 81,355
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 110,519
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,459
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,474,559
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,092,411
12.26 POSTE METÁLICO 6M UN ### 1,377,528
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 642,990
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 116,555
12.29 LUMINARIA 70W SODIO UN ### 539,723
12.30 LUMINARIA 150W SODIO UN ### 675,594
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,786,657
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,315,313
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 43,103
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 43,141
13.3 ALISTADO PARA LISTÓN M2 ### 15,493
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ###
i 32,462
p
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### i 93,363
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### o 29,284
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 68,857
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 97,738
13.9 MANTO FIBERGLASS 600X1 M2 ### 32,122
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,986
13.11 PERMA PLY 2 CAPAS M2 ### 28,051
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 56,904
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 67,135
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 98,455
13.15 TRITURADO FINO 1/2 M3 ### 211,624
13.16 TRITURADO GRUESO 3/4 M3 ### 219,209
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 60,943
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 36,145
14.3 ADOQUÍN CONCRETO 6CM M2 ### 70,419
14.4 ADOQUÍN CONCRETO 8CM M2 ### 73,969
14.5 ADOQUÍN GRES PEATONAL M2 ### 78,497
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 80,603
14.7 GRAVILLA PARA GRADAS ML ### 38,864
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 177,136
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 49,818
14.10 GUARDAESCOBA EN GRANITO ML ### 45,497
14.11 GUARDAESCOBA EN GRAVILLA ML ### 11,402
14.12 GUARDAESCOBA PVC CARAMELO ML ### 10,035
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,494
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,061
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,711
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 36,708
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,482
14.18 LISTÓN M.H. AMARILLO M2 ### 78,476
14.19 PASO ESCALERA GRANITO ML ### 126,658
14.20 PIRLANES ALUMINIO ML ### 7,701
14.21 PIRLANES LADRILLO ML ### 33,985
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,850
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
14.23 PISO VINILO TRÁFICO PESADO M2 ###
i 56,897
p
14.24 PULIDA LACADA PISO MADERA M2 ### i 51,641
14.25 TABLETA DE GRES 25X25 M2 ### o 52,857
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 59,389
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,342
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 53,299
14.29 JABONERA PORCELANA ACUARIO UN ### 21,904
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 131,571
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,297
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,841
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,154
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,711
14.35 REMATES BOCEL ALUMINIO ML ### 8,810
14.36 REMATES BOCEL PORCELANA ML ### 8,972
14.37 TAPA REGISTRO 20X20 UN ### 20,138
14.38 TAPA REGISTRO 6X6 UN ### 18,317
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,139
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 23,282
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 70,001
14.42 MEDIA CAÑA EN GRANITO ML ### 83,089
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,880
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,981
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 109,568
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 132,232
15 CIELO RASO
15.1 APLIQUE YESO ML ### 78,009
15.2 ARMADURA MADERA Y MALLA M2 ### 37,166
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,384
15.4 CIELO RASO DURACUSTIC M2 ### 71,941
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,578
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,901
15.7 CORNISAS YESO ML ### 52,440
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 110,709
15.9 MALLA CON VENA M2 ### 13,925
16 EXCAVACIONES Y RELLENOS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
16.1 EXPLANACIÓN Y EXTENDIDA M3 ###
i 5,627
p
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA i
16.2 MENOR DE 5 KM) M3 ### 18,479
o
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 167,646
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 183,702
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 249,417
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 167,354
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 216,600
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 246,386
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 322,892
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 956,349
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 517,203
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 147,920
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 208,483
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 193,443
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 428,790
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,100,239
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 310,811
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 219,193
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 85,850
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA)
UN ### 266,246
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17.13 ACCESORIOS Y GRIFERÍA) UN ### 393,366
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,681
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,238
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ###
i 11,458
p
18.4 BARNIZ SOBRE MUEBLES M2 ### i 44,212
18.5 CARBURO SOBRE PAÑETES M2 ### o 6,014
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 70,416
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,560
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,897
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,464
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,205
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,259
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,068
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,883
18.14 ESTUCO M2 ### 7,202
18.15 ESTUCO (LINEAL) ML ### 4,496
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,071
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,914
18.18 LACA PISOS MADERA M2 ### 23,373
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,774
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,826
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,453
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,090
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,344
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,592
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,916
18.26 PINTURA EPÓXICA M2 ### 13,086
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,052
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,527,854
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR
19.2 (PAR)
UN ### 11,533,639
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,018,082
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,863,966
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,238,825
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,774
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 924,725
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 92,618
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,676,801
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ###
i 743,249
p
i
20 INSTALACIONES RED GASES o
20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,826
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 46,104
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 57,263
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,432
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,407
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,648
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,988
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,472
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,706
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,765
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,647
20.12 VÁLVULA DE BOLA GAS 1" UN ### 38,018
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 292,505
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 336,800
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 351,047
20.16 ACOMETIDA GAS 1/2" ML ### 324,903
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 122,519
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,279,502
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 160,183
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,482,038
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,032,797
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,557
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 121,621
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 287,423
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 287,416
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 461,550
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 121,672
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 121,672
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 287,423
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 287,423
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 461,550
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 461,624
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 750,944
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,205,727
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 74,460
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 385,923
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 434,411
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,201,561
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 70,586
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 349,646
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 53,326
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 75,507
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 109,059
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 167,454
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 269,310
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 389,786
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 493,563
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 649,067
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 893,499
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 79,209
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 93,613
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 67,484
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 73,413
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 72,882
5.6 BORDE SEPARADOR VERDE A-170 ML ### 270,925
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,896
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 48,111
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ###
i 88,186
p
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### i 590,871
5.11 LOSETA PREFABRICADA A-40 M2 ### o 67,049
5.12 LOSETA PREFABRICADA A-60 M2 ### 97,488
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 38,659
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 64,115
5.15 SARDINEL PREFABRICADO A-10 ML ### 115,306
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 64,106
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 219,299
6.2 BANCA EN CONCRETO M-30 UN ### 714,751
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 227,757
6.4 BOLARDO M-60 CONCRETO UN ### 176,009
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 177,877
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 208,231
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 62,706
6.8 BORDILLO PREFABRICADO A-80 ML ### 73,747
6.9 CANECA M-120 UN ### 331,823
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 876,139
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,597,119
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,700,506
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 518,435
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 691,929
6.15 BANCA EN MADERA M-50 UN ### 567,796
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 263,944
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 613,051
6.18 POSTE HISTÓRICO M-131 UN ### 6,848,993
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,294
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,586
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 332,783
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 526,473
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 246,814
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 262,325
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 274,072
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
7.8 TACHAS REFLECTIVAS UN ###
i 14,306
p
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### i 15,289
o
7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 125,010
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS p 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM) M3 ### 152,777
1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673
1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.4 200.2 DISTANCIA DE 5KM)
HA ### 933,801
1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y
1.6 *** DERRUMBES M3-KM### 1,318
4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,409
4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,699
4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,892
4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,699
4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 18,719
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO
SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
CONSTRUCCIÓN
2,129,295 2,214,136
1,235,572 1,277,992
14,622 14,622
16,396 16,396
18,937 18,937
69,481 69,481
48,960 49,833
22,664 23,537
80,242 80,242
6,261 6,261
8,882 8,882
6,813 6,813
7,419 7,419
8,964 8,964
9,084 9,084
13,497 13,497
18,477 18,477
27,441 27,441
39,898 39,898
49,367 49,367
40,806 40,806
57,319 57,319
67,872 67,872
83,193 83,193
9,103 9,103
14,736 14,736
22,422 22,422
36,746 36,746
233,157 233,157
1,539 1,539
5,807 5,807
20,960 20,960
11,490 11,490
11,307 11,307
10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
9,803 9,803
15,459 15,459
13,512 13,512
11,490 11,490
963,422 971,953
10,963 10,963
3,971 3,971
2,855,865 2,855,865
262,620 262,620
9,189 9,189
131,186 139,753
207,589 269,856
297,878 297,878
207,425 207,425
23,437 23,437
692,689 779,826
691,820 779,987
643,374 725,930
50,335 50,335
155,339 155,339
195,831 195,831
244,798 244,798
310,715 310,715
109,309 115,109
135,840 144,246
629,225 711,781
93,074 93,074
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
40,219 40,606
211,002 211,389
500,650 526,642
237,760 246,863
271,860 286,561
357,875 382,978
107,123 107,103
1,371,913 1,371,714
120,863 125,137
76,841 79,096
30,197 32,071
48,359 50,232
63,674 66,296
87,073 90,071
119,999 122,622
1,035,053 1,065,025
1,474,901 1,534,845
1,944,680 2,064,568
44,614 44,614
59,099 59,099
856,413 938,970
283,554 338,632
105,683 113,698
124,850 134,468
137,743 150,567
145,380 159,006
167,069 183,901
186,033 205,270
206,528 228,169
104,987 106,219
1,013,198 1,095,754
100,776 101,550
84,488 92,744
95,318 105,417
111,363 124,027
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
751,106 833,663
51,232 53,686
300,644 337,514
4,453 4,453
4,670 4,670
6,449 6,449
899,936 982,492
825,417 915,831
894,760 977,316
874,712 957,268
1,085,901 1,168,458
367,034 464,130
30,739 32,761
51,209 53,232
36,182 36,569
169,418 170,192
45,973 48,427
27,878 28,651
104,909 106,456
96,789 104,968
95,785 95,785
55,816 55,816
92,158 92,158
54,002 54,002
107,465 107,465
62,978 62,978
119,775 119,775
69,133 69,133
42,649 43,426
25,638 26,027
56,002 56,520
33,380 33,640
62,963 63,481
37,534 37,793
104,530 107,122
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
61,344 62,640
39,041 39,559
23,501 23,760
77,990 79,026
46,656 47,174
93,018 93,791
55,847 56,234
192,892 196,520
114,840 116,654
94,779 96,392
56,728 57,534
49,306 50,466
29,752 30,332
35,318 35,836
21,365 21,624
53,804 54,840
32,683 33,201
104,028 105,582
62,762 63,539
75,823 76,859
45,439 45,957
159,768 163,395
96,341 98,154
33,188 33,575
38,003 39,163
64,203 65,750
5,292 5,292
51,581 53,604
10,692 10,692
14,248 14,248
18,654 18,654
26,309 26,309
39,497 39,497
5,256 5,888
16,399 16,399
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
5,860 6,247
7,046 7,433
8,395 8,782
7,173 7,173
14,027 14,027
24,603 25,732
14,896 15,460
21,646 22,735
13,107 13,651
20,712 21,841
12,640 13,204
21,646 22,735
13,107 13,651
22,189 22,994
13,377 13,780
17,975 18,804
10,983 11,397
17,263 18,123
10,627 11,057
22,424 23,513
13,476 14,020
21,491 22,619
13,009 13,574
17,873 18,734
10,914 11,344
22,380 23,509
13,858 14,423
27,588 29,143
88,339 92,429
58,694 58,694
23,174 23,174
36,469 36,469
85,945 85,945
67,170 67,170
38,812 38,812
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
90,102 90,102
107,707 107,707
158,572 158,572
62,190 62,190
86,163 86,163
78,222 78,222
139,912 139,912
81,857 81,857
60,004 60,004
33,684 33,684
61,778 63,712
50,038 50,038
45,840 45,840
38,310 38,310
37,543 37,543
37,831 37,831
53,543 53,543
47,003 47,003
86,426 86,426
160,094 160,094
71,779 71,779
44,139 44,139
34,725 34,725
61,149 61,149
20,709 20,709
25,037 25,037
27,222 27,222
35,212 35,212
23,094 23,094
54,451 54,451
380,467 380,467
423,505 423,505
286,853 286,853
307,131 307,131
494,863 578,931
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
436,935 517,087
437,893 522,492
384,014 465,809
364,938 452,244
341,233 435,501
252,509 305,881
474,915 526,739
430,440 484,198
496,429 546,706
738,329 788,606
130,021 130,021
4,149 4,536
145,014 145,014
178,128 178,128
260,990 260,990
290,616 290,616
320,274 320,274
212,997 212,997
241,564 241,564
355,830 355,830
134,439 134,439
178,717 178,717
198,714 198,714
507,232 507,232
44,262 44,262
27,283 27,283
104,596 104,596
129,571 129,571
100,576 100,576
30,931 30,931
30,931 30,931
29,302 29,302
44,715 44,715
55,535 55,535
67,075 67,075
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
80,780 80,780
382,442 382,442
267,033 267,033
35,338 35,338
45,436 45,436
55,535 55,535
69,961 69,961
80,166 80,166
225,234 225,234
84,532 84,532
150,105 150,105
143,623 143,623
94,270 94,270
222,807 222,807
115,694 115,694
6,919 6,919
103,253 103,253
127,869 127,869
42,551 42,551
575,228 575,228
206,127 206,127
229,944 229,944
523,641 523,641
133,723 133,723
419,905 419,905
6,330 6,330
294,401 294,401
127,576 127,576
90,964 90,964
93,699 93,699
10,989 10,989
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
12,228 12,228
9,656 9,656
230,334 230,334
279,077 279,077
23,174 23,174
36,469 36,469
34,846 34,846
44,808 44,808
92,760 92,760
231,791 231,791
44,369 44,369
616,334 616,334
1,268,924 1,268,924
36,473 36,473
68,853 68,853
103,054 103,054
87,487 87,487
63,150 63,150
67,332 67,332
85,115 85,115
69,033 69,033
86,876 86,876
93,060 93,060
77,706 77,706
13,112 13,112
18,560 18,560
24,212 24,212
14,895 14,895
8,858 8,858
54,173 54,173
34,575 34,575
11,121 11,121
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
26,617 26,617
37,002 37,002
50,265 50,265
94,480 94,480
114,271 114,271
63,622 63,622
81,219 81,219
196,827 196,827
406,899 406,899
300,226 300,226
18,502 18,502
23,371 23,371
181,907 181,907
297,010 297,010
494,934 494,934
42,805 42,805
50,513 50,513
64,430 64,430
73,436 73,436
94,701 94,701
108,925 108,925
160,806 160,806
64,550 64,550
64,819 64,819
42,079 42,079
52,020 52,020
4,427 4,427
7,001 7,001
1,078,554 1,078,554
821,742 821,742
2,786,337 2,786,337
2,321,755 2,321,755
668,601 668,601
867,424 867,424
336,265 336,265
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
385,757 385,757
61,304 61,304
72,675 72,675
80,562 80,562
95,019 95,019
57,576 57,576
65,684 65,684
150,938 150,938
59,162 59,162
136,113 136,113
81,281 81,281
48,217 48,217
101,319 101,319
432,302 432,302
576,472 576,472
3,735 3,735
4,929 4,929
7,679 7,679
13,726 13,726
288,726 288,726
81,355 81,355
110,519 110,519
44,459 44,459
1,474,559 1,474,559
1,092,411 1,092,411
1,377,528 1,377,528
642,990 642,990
116,555 116,555
539,723 539,723
675,594 675,594
1,786,657 1,786,657
1,315,313 1,315,313
41,318 43,252
41,356 43,289
15,136 15,523
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
28,892 32,760
89,793 93,661
27,673 29,419
61,306 69,486
85,658 98,745
32,122 32,122
23,986 23,986
28,051 28,051
50,108 57,470
58,830 67,828
85,619 99,524
140,383 217,561
152,373 217,516
60,229 61,003
35,788 36,175
68,634 70,567
72,184 74,117
76,712 78,646
79,889 80,662
37,959 38,939
173,923 177,404
47,650 49,998
45,497 45,497
10,497 11,478
10,035 10,035
13,494 13,494
11,061 11,061
18,711 18,711
36,708 36,708
9,482 9,482
78,476 78,476
124,159 126,866
7,701 7,701
33,271 34,045
48,850 48,850
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
56,897 56,897
51,641 51,641
52,143 52,917
58,675 59,449
11,342 11,342
52,228 53,388
21,904 21,904
131,571 131,571
10,297 10,297
23,841 23,841
15,154 15,154
14,711 14,711
8,810 8,810
8,972 8,972
20,138 20,138
18,317 18,317
20,139 20,139
23,282 23,282
69,287 70,060
83,089 83,089
34,880 34,880
13,981 13,981
109,568 109,568
132,232 132,232
78,009 78,009
37,166 37,166
58,384 58,384
71,941 71,941
53,578 53,578
99,901 99,901
52,440 52,440
110,709 110,709
13,925 13,925
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
5,627 5,627
18,479 18,479
25,905 25,905
43,707 43,707
49,987 49,987
85,005 85,005
19,114 19,114
141,945 138,518
123,378 188,729
191,162 235,710
121,092 129,659
158,344 202,892
188,131 232,679
322,892 322,892
956,349 956,349
517,203 517,203
147,920 147,920
208,483 208,483
193,443 193,443
428,790 428,790
1,100,239 1,100,239
310,811 310,811
219,193 219,193
85,850 85,850
266,246 266,246
393,366 393,366
8,681 8,681
3,238 3,238
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
11,458 11,458
44,212 44,212
6,014 6,014
70,416 70,416
3,560 3,560
2,897 2,897
14,464 14,464
4,205 4,205
15,259 15,259
6,068 6,068
6,883 6,883
7,202 7,202
4,496 4,496
16,071 16,071
9,914 9,914
23,373 23,373
2,774 2,774
12,826 12,826
3,453 3,453
13,090 13,090
7,344 7,344
4,592 4,592
22,916 22,916
13,086 13,086
8,052 8,052
6,527,854 6,527,854
11,533,639 11,533,639
3,018,082 3,018,082
9,863,966 9,863,966
9,238,825 9,238,825
2,774 2,774
924,725 924,725
92,618 92,618
1,676,025 1,676,866
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
723,726 744,876
30,826 30,826
46,104 46,104
57,263 57,263
18,432 18,432
22,407 22,407
30,648 30,648
26,988 26,988
28,472 28,472
35,706 35,706
18,765 18,765
24,647 24,647
38,018 38,018
292,505 292,505
336,800 336,800
351,047 351,047
324,903 324,903
237,264 237,264
36,517 36,517
110,280 110,280
276,230 276,230
54,847 54,847
611,317 611,317
1,524,189 1,524,189
45,581 45,581
237,819 237,819
46,039 46,039
3,992 3,992
6,766 6,766
19,195 19,195
25,226 25,226
32,838 32,838
131,173 131,173
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
34,200 34,200
112,266 112,266
192,104 192,104
304,942 304,942
377,425 377,425
413,134 413,134
600,736 600,736
352,641 352,641
111,139 111,139
14,868 14,868
30,437 30,437
5,271 5,271
36,927 36,927
38,629 38,629
39,480 39,480
25,738 25,738
28,537 28,537
29,713 29,713
50,390 50,390
654,881 654,881
335,116 335,116
92,481 92,481
1,929 1,929
8,923 8,923
13,393 13,393
22,420 22,420
4,124 4,124
22,897 22,897
33,535 33,535
20,156 20,156
16,208 16,208
664,025 664,025
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
URBANISMO
9,712 9,712
97,119 97,119
548,328 548,328
1,170,447 1,170,447
133,974 133,974
817,630 817,630
1,760,474 1,760,474
13,749 13,749
17,030 17,030
21,462 21,462
23,519 23,519
28,256 28,256
28,256 28,256
114,598 114,598
132,699 132,699
410,843 410,843
154,334 154,334
254,413 254,413
1,126,719 1,126,719
1,298,260 1,298,260
15,016 15,016
13,224 13,224
33,179 33,179
131,006 131,006
195,449 195,449
31,767 31,767
109,707 109,707
162,927 162,927
32,183 32,183
66,445 66,445
268,367 268,367
77,587 77,587
312,359 312,359
186,383 186,383
532,995 532,995
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
1,430,788 1,430,788
2,114,291 2,114,291
11,086 11,086
25,273 25,273
19,114 19,114
85,792 136,714
136,911 133,484
126,152 134,719
139,131 139,131
116,864 140,893
95,153 145,431
122,519 122,519
1,279,502 1,279,502
160,183 160,183
1,482,038 1,482,038
1,032,797 1,032,797
63,557 63,557
121,621 121,621
287,423 287,423
287,416 287,416
461,550 461,550
121,672 121,672
121,672 121,672
287,423 287,423
287,423 287,423
461,550 461,550
461,624 461,624
750,944 750,944
1,205,727 1,205,727
74,460 74,460
385,923 385,923
434,411 434,411
1,201,561 1,201,561
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
70,108 70,626
349,646 349,646
53,326 53,326
75,507 75,507
109,059 109,059
167,454 167,454
269,310 269,310
389,786 389,786
493,563 493,563
649,067 649,067
893,499 893,499
712,263 763,023
677,427 702,063
757,564 791,403
847,997 911,446
965,755 1,000,446
876,952 923,482
1,022,585 1,043,518
1,493,667 1,558,642
2,084,544 2,216,122
2,769,093 2,987,807
1,945,707 1,945,707
4,126,623 4,126,623
143,343 144,349
76,710 79,417
91,114 93,821
59,557 68,145
65,214 74,097
65,113 73,529
269,997 271,002
18,945 19,975
42,523 48,576
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
87,690 88,228
577,576 591,979
64,925 67,226
95,364 97,665
35,379 38,932
57,477 64,668
108,044 113,755
62,821 64,213
215,395 219,625
709,284 715,206
226,952 227,825
171,323 176,399
173,191 178,267
203,396 208,634
60,793 62,866
71,605 73,926
331,345 331,863
873,796 876,334
3,595,557 3,597,249
3,698,944 3,700,636
516,823 518,569
685,481 692,466
567,796 567,796
261,601 264,139
611,855 613,150
6,837,279 6,849,969
4,294 4,294
45,586 45,586
332,319 332,822
523,249 526,742
246,350 246,853
261,861 262,364
273,608 274,111
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
14,306 14,306
15,289 15,289
125,010 125,010
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
GÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
152,777 152,777
53,673 53,673
2,613,971 2,613,971
933,801 933,801
89,524 89,524
1,318 1,318
9,548 9,548
36,119 36,119
8,749 8,749
14,967 14,967
13,068 13,068
7,499 7,499
481 481
12,832 12,832
20,948 20,948
65,971 65,971
80,744 80,744
19,035 19,035
39,738 39,738
31,203 31,203
53,644 53,644
5,366 5,366
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
158,344 202,892
188,131 232,679
139,125 139,125
3,397 3,397
1,161 1,161
232,253 245,731
69,128 72,902
639,814 712,304
666,589 739,079
704,584 777,074
674,027 746,517
178,402 251,603
345,982 390,530
314,721 359,270
40,406 40,406
180,729 180,729
121,092 129,659
12,033 13,003
4,851 5,336
673,737 749,853
708,343 787,866
730,826 812,259
7,235 7,235
153,710 187,055
950,681 1,037,021
822,879 907,787
870,208 958,479
605,340 686,294
702,895 787,055
606,308 691,753
703,901 792,730
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
765,339 850,784
626,890 715,718
810,389 899,218
12,202 12,202
15,762 15,762
1,850 1,850
2,800,780 2,800,780
4,225,071 4,372,757
1,767,957 1,852,556
91,751 91,751
373,927 384,079
438,687 438,687
17,763 17,763
542,906 632,427
175,833 175,833
137,157 133,994
414,306 502,485
404,996 469,505
413,639 478,148
416,442 477,644
425,085 486,287
545,852 628,465
641,290 727,175
242,185 274,015
246,613 278,443
44,141 49,212
17,295 19,830
10,607 10,607
15,177 15,177
20,471 20,471
24,565 24,565
31,601 31,601
7,612 7,612
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
8,687 8,687
9,033 9,033
6,409 6,409
9,699 9,699
7,892 7,892
9,699 9,699
18,719 18,719
665,227 666,008
385,322 403,789
933,337 933,337
188,393 196,630
4,670 4,670
90,969 90,969
138,659 138,659
558,138 644,023
258,363 290,193
71,885 71,885
4,294 4,294
45,586 45,586
88,714 88,714
73,746 73,746
155,133 158,233
14,306 14,306
851 851
131,984 131,984
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
25,566 25,566
8,310 8,310
448,890 448,890
1,804 1,804
16,222 16,222
26,374 26,374
9,829 9,829
ILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO
EÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
p CONSTRUCCIÓN
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ### o2,066,318 2,068,356 2,069,375 2,066,318 2,059,183 2,054,087 2,079,568 2,048,990
1.2 CAMPAMENTO 9 M2 UN ### 1,201,301 1,202,320 1,202,830 1,201,301 1,197,733 1,195,185 1,207,926 1,192,637
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,310 14,310 14,310 14,310 14,310 14,310 14,310 14,310
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,044 16,044 16,044 16,044 16,044 16,044 16,044 16,044
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,546 18,546 18,546 18,546 18,546 18,546 18,546 18,546
1.6 CERCA EN TABLA H=2.30 M ML ### 67,008 67,008 67,008 67,008 67,008 67,008 67,008 67,008
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 47,391 47,413 47,424 47,391 47,313 47,257 47,536 47,201
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,102 22,125 22,136 22,102 22,024 21,968 22,247 21,913
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2### 80,242 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2### 6,261 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2### 8,882 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2### 6,813 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2### 7,419 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2### 8,964 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2### 9,084 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2### 13,497 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2### 18,477 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2### 27,441 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2### 39,898 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2### 49,367 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2### 40,806 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2### 57,319 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2### 67,872 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2### 83,193 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2### 9,103 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2### 14,736 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2### 22,422 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2### 36,746 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3### 233,157 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2### 1,539 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2### 5,807 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2### 11,307 11,307 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2### 10,480 10,480 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2### i 9,803 9,803 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2###
i 15,459 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 926,538 927,259 926,077 925,444 924,762 923,209 925,502 922,650
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS
1.41 DE PRESICIÓN M2### 10,607 10,607 10,607 10,607 10,607 10,607 10,607 10,607
1.42 REPLANTEO MANUAL DE CIMIENTOS M2### 3,831 3,831 3,831 3,831 3,831 3,831 3,831 3,831
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,745,832 2,745,832 2,745,832 2,745,832 2,745,832 2,745,832 2,745,832 2,745,832
1.44 RED TELEFÓNICA PROVISIONAL UN ### 253,517 253,517 253,517 253,517 253,517 253,517 253,517 253,517
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE) M3### 9,189 9,189 9,189 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3### 104,250 109,390 88,829 87,116 81,976 78,549 92,256 71,695
2.2 BASE ARENA CEMENTO 1:20 M3### 259,126 261,508 262,697 259,126 250,793 244,841 274,603 238,889
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3### 297,878 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3### 207,425 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2### 22,604 22,604 22,604 22,604 22,604 22,604 22,604 22,604
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3### 682,422 684,607 685,701 682,422 674,768 669,303 696,634 663,836
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3### 685,903 688,176 689,314 685,903 677,942 672,257 700,684 666,571
2.8 ZAPATAS EN CONCRETO 3500 PSI M3### 638,662 640,791 641,856 638,662 631,208 625,885 652,504 620,561
2.9 PILOTE DE MADERA D=20 CM ML ### 49,919 49,919 49,919 49,919 49,919 49,919 49,919 49,919
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE
2.10 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 153,988 153,988 153,988 153,988 153,988 153,988 153,988 153,988
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE
2.11 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 192,819 192,819 192,819 192,819 192,819 192,819 192,819 192,819
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE
2.12 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 239,778 239,778 239,778 239,778 239,778 239,778 239,778 239,778
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE
2.13 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 302,992 302,992 302,992 302,992 302,992 302,992 302,992 302,992
2.14 PILOTE HINCADO 25X25 ML ### 108,366 108,521 108,599 108,366 107,820 107,431 109,378 107,041
2.15 PILOTE HINCADO 30X30 ML ### 134,473 134,699 134,811 134,473 133,682 133,118 135,941 132,553
2.16 DADOS EN CONCRETO 3500PSI M3### 624,513 626,642 627,707 624,513 617,059 611,736 638,354 606,412
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM) ML ### 92,185 92,185 92,185 92,185 92,185 92,185 92,185 92,185
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2### 43,093 43,093 43,093 43,093 43,093 43,093 43,093 43,093
4.2 CASETÓN DE LONA 0.80X0.70 M2### 56,952 56,952 56,952 56,952 56,952 56,952 56,952 56,952
4.3 COLUMNAS 3500 PSI M3### 847,298 849,427 850,492 847,298 839,844 834,521 861,139 829,197
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3### 273,658 277,410 273,436 270,733 265,123 260,340 280,078 256,392
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10
4.5 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2### 103,282 103,489 103,592 103,282 102,559 102,042 104,626 101,525
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12
4.6 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2### 121,918 122,166 122,290 121,918 121,050 120,429 123,531 119,809
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO) M2### 136,117 136,448 136,614 136,117 134,960 134,133 138,268 133,306
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2### 298,551 299,502 299,978 298,551 295,222 292,845 304,733 290,467
4.21 ACERO FIGURADO 37000 PSI KG ### 4,285 4,285 4,285 4,285 4,285 4,285 4,285 4,285
4.22 ACERO FIGURADO 60000 PSI KG ### 4,494 4,494 4,494 4,494 4,494 4,494 4,494 4,494
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,270 6,270 6,270 6,270 6,270 6,270 6,270 6,270
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3### 892,661 894,790 895,855 892,661 885,207 879,884 906,502 874,560
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3### 819,466 821,796 822,962 819,466 811,308 805,483 834,614 799,657
4.26 VIGA AÉREA 3500 PSI M3### 886,923 889,052 890,117 886,923 879,469 874,146 900,764 868,822
4.27 VIGA CINTA 3500 PSI M3### 866,854 868,983 870,048 866,854 859,400 854,077 880,695 848,753
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3### 1,077,599 1,079,728 1,080,793 1,077,599 1,070,145 1,064,821 1,091,440 1,059,497
4.29 BASE EN CONCRETO POBRE 1500 PSI M3### 358,910 361,243 362,409 358,910 350,745 344,913 374,075 339,080
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,973 31,032 31,062 30,973 30,768 30,621 31,355 30,474
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 51,387 51,446 51,475 51,387 51,181 51,035 51,769 50,888
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,859 35,874 35,882 35,859 35,808 35,771 35,956 35,734
5.4 ARCOS EN LADRILLO PRENSADO ML ### 166,867 166,897 166,912 166,867 166,764 166,690 167,060 166,616
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,619 45,685 45,718 45,619 45,389 45,224 46,048 45,059
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,105 28,137 28,152 28,105 27,995 27,916 28,310 27,838
5.7 ENCHAPES LADRILLO PRENSADO M2### 102,819 102,878 102,908 102,819 102,612 102,464 103,204 102,316
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2### 95,695 95,914 96,024 95,695 94,926 94,376 97,123 93,827
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2### 93,102 93,102 93,102 93,102 93,102 93,102 93,102 93,102
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### i 54,475 54,475 54,475 54,475 54,475 54,475 54,475 54,475
p
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2### i 89,632 89,632 89,632 89,632 89,632 89,632 89,632 89,632
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### o 52,740 52,740 52,740 52,740 52,740 52,740 52,740 52,740
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2### 104,138 104,138 104,138 104,138 104,138 104,138 104,138 104,138
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 61,314 61,314 61,314 61,314 61,314 61,314 61,314 61,314
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2### 115,915 115,915 115,915 115,915 115,915 115,915 115,915 115,915
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 67,202 67,202 67,202 67,202 67,202 67,202 67,202 67,202
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2### 42,204 42,234 42,249 42,204 42,100 42,026 42,398 41,952
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,416 25,431 25,438 25,416 25,364 25,327 25,513 25,290
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2### 54,687 54,707 54,717 54,687 54,618 54,568 54,816 54,519
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,723 32,733 32,738 32,723 32,688 32,663 32,787 32,639
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2### 61,435 61,455 61,465 61,435 61,366 61,317 61,564 61,267
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,770 36,780 36,785 36,770 36,736 36,711 36,835 36,686
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2### 103,688 103,788 103,837 103,688 103,342 103,094 104,333 102,846
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 60,923 60,973 60,998 60,923 60,750 60,626 61,245 60,502
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2### 38,483 38,503 38,513 38,483 38,414 38,365 38,612 38,315
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,223 23,232 23,237 23,223 23,188 23,163 23,287 23,138
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2### 76,678 76,718 76,737 76,678 76,539 76,440 76,936 76,341
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,000 46,020 46,030 46,000 45,931 45,881 46,129 45,832
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2### 90,658 90,689 90,705 90,658 90,548 90,469 90,862 90,390
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 54,667 54,683 54,691 54,667 54,612 54,573 54,770 54,534
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2### 189,684 189,823 189,892 189,684 189,199 188,852 190,586 188,505
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 113,236 113,305 113,340 113,236 112,993 112,820 113,687 112,646
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2### 93,170 93,232 93,262 93,170 92,954 92,800 93,571 92,646
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 55,923 55,954 55,970 55,923 55,815 55,738 56,124 55,661
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2### 48,948 48,992 49,015 48,948 48,793 48,682 49,237 48,571
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,573 29,595 29,606 29,573 29,495 29,440 29,717 29,384
5.37 MURO TOLETE COMÚN 0.06 M M2### 34,883 34,903 34,913 34,883 34,814 34,764 35,012 34,714
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,147 21,157 21,162 21,147 21,112 21,088 21,212 21,063
5.39 MURO TOLETE COMÚN 0.12 M M2### 53,090 53,129 53,149 53,090 52,951 52,852 53,347 52,753
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,326 32,346 32,355 32,326 32,256 32,207 32,455 32,157
5.41 MURO TOLETE COMÚN 0.25 M M2### 102,068 102,128 102,158 102,068 101,860 101,712 102,455 101,563
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 61,782 61,812 61,827 61,782 61,678 61,604 61,976 61,530
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2### 74,434 74,474 74,494 74,434 74,296 74,197 74,692 74,097
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
5.44 ML ### p 44,717 44,737 44,747 44,717 44,648 44,598 44,846 44,549
(LINEAL)
i
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2### o 157,977 158,116 158,185 157,977 157,492 157,145 158,879 156,798
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA
5.46 (LINEAL) ML ### 95,407 95,476 95,511 95,407 95,164 94,990 95,857 94,817
5.47 REMATES LADRILLO PRENSADO ML ### 32,705 32,719 32,727 32,705 32,653 32,616 32,801 32,579
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,041 38,085 38,107 38,041 37,885 37,775 38,329 37,664
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 63,906 63,965 63,995 63,906 63,699 63,551 64,291 63,403
5.50 LAVADA DE FACHADA M2### 5,265 5,265 5,265 5,265 5,265 5,265 5,265 5,265
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,753 51,811 51,841 51,753 51,547 51,400 52,134 51,253
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,639 10,639 10,639 10,639 10,639 10,639 10,639 10,639
5.53 ANCLAJE 3/8" L=30CM UN ### 14,081 14,081 14,081 14,081 14,081 14,081 14,081 14,081
5.54 ANCLAJE 1/2" L=50CM UN ### 18,407 18,407 18,407 18,407 18,407 18,407 18,407 18,407
5.55 ANCLAJE 5/8" L=70CM UN ### 25,806 25,806 25,806 25,806 25,806 25,806 25,806 25,806
5.56 ANCLAJE 3/4" L=70CM UN ### 38,533 38,533 38,533 38,533 38,533 38,533 38,533 38,533
5.57 ANCLAJE 1" L= 70CM UN ### 5,208 5,224 5,232 5,208 5,153 5,113 5,311 5,073
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,538 13,554 13,561 13,538 13,484 13,446 13,638 13,408
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2### 18,503 18,535 18,551 18,503 18,392 18,313 18,709 18,234
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,247 11,263 11,271 11,247 11,191 11,152 11,350 11,112
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2### i 17,852 17,885 17,902 17,852 17,737 17,655 18,066 17,573
p
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ###
i 10,922 10,938 10,946 10,922 10,864 10,823 11,028 10,782
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2### o 23,118 23,160 23,180 23,118 22,972 22,868 23,389 22,764
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,823 13,844 13,854 13,823 13,750 13,698 13,958 13,646
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2### 22,264 22,307 22,329 22,264 22,113 22,005 22,544 21,897
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,396 13,417 13,428 13,396 13,320 13,266 13,536 13,212
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2### 18,463 18,496 18,512 18,463 18,348 18,265 18,676 18,183
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,209 11,225 11,234 11,209 11,151 11,110 11,316 11,069
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2### 23,153 23,196 23,218 23,153 23,002 22,894 23,434 22,786
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,245 14,266 14,277 14,245 14,169 14,115 14,385 14,061
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2### 28,579 28,638 28,668 28,579 28,371 28,222 28,965 28,074
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN
7.2 ASFALTO (INCLUYE TELA IMPERMEABLE) M2### 86,359 86,469 86,524 86,359 85,975 85,700 87,073 85,426
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 56,595 56,595 56,595 56,595 56,595 56,595 56,595 56,595
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,526 22,526 22,526 22,526 22,526 22,526 22,526 22,526
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,383 35,383 35,383 35,383 35,383 35,383 35,383 35,383
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 82,721 82,721 82,721 82,721 82,721 82,721 82,721 82,721
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 64,760 64,760 64,760 64,760 64,760 64,760 64,760 64,760
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,636 37,636 37,636 37,636 37,636 37,636 37,636 37,636
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 86,700 86,700 86,700 86,700 86,700 86,700 86,700 86,700
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 103,539 103,539 103,539 103,539 103,539 103,539 103,539 103,539
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 152,197 152,197 152,197 152,197 152,197 152,197 152,197 152,197
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 60,071 60,071 60,071 60,071 60,071 60,071 60,071 60,071
7.13 CANAL PVC AMAZONAS ML ### 83,432 83,432 83,432 83,432 83,432 83,432 83,432 83,432
7.14 CANAL PVC RAINGO ML ### 75,837 75,837 75,837 75,837 75,837 75,837 75,837 75,837
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2### 134,740 134,740 134,740 134,740 134,740 134,740 134,740 134,740
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2### 78,709 78,709 78,709 78,709 78,709 78,709 78,709 78,709
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2### 57,804 57,804 57,804 57,804 57,804 57,804 57,804 57,804
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,870 32,870 32,870 32,870 32,870 32,870 32,870 32,870
7.19 TEJA DE BARRO M2### 62,096 62,170 62,207 62,096 61,837 61,652 62,577 61,468
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2### 48,190 48,190 48,190 48,190 48,190 48,190 48,190 48,190
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2### 44,175 44,175 44,175 44,175 44,175 44,175 44,175 44,175
7.22 TEJA FIBROCEMENTO Nº4 M2### 37,227 37,227 37,227 37,227 37,227 37,227 37,227 37,227
7.23 TEJA FIBROCEMENTO No. 6 M2### 36,453 36,453 36,453 36,453 36,453 36,453 36,453 36,453
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
7.24 TEJA FIBROCEMENTO No. 8 M2### i 36,729 36,729 36,729 36,729 36,729 36,729 36,729 36,729
p
7.25 TEJA TERMOACÚSTICA M2###
i 51,726 51,726 51,726 51,726 51,726 51,726 51,726 51,726
7.26 TEJA PLÁSTICA No.6 M2### o 45,469 45,469 45,469 45,469 45,469 45,469 45,469 45,469
7.27 TEJA ESPAÑOLA ETERNIT M2### 83,253 83,253 83,253 83,253 83,253 83,253 83,253 83,253
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO
7.28 INYECTADO 30MM M2### 153,776 153,776 153,776 153,776 153,776 153,776 153,776 153,776
7.29 TEJA SIN TRASLAPO M2### 69,114 69,114 69,114 69,114 69,114 69,114 69,114 69,114
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2### 43,236 43,236 43,236 43,236 43,236 43,236 43,236 43,236
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2### 33,892 33,892 33,892 33,892 33,892 33,892 33,892 33,892
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2### 59,171 59,171 59,171 59,171 59,171 59,171 59,171 59,171
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,322 20,322 20,322 20,322 20,322 20,322 20,322 20,322
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,462 24,462 24,462 24,462 24,462 24,462 24,462 24,462
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2### 26,517 26,517 26,517 26,517 26,517 26,517 26,517 26,517
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2### 34,161 34,161 34,161 34,161 34,161 34,161 34,161 34,161
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,533 22,533 22,533 22,533 22,533 22,533 22,533 22,533
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 53,060 53,060 53,060 53,060 53,060 53,060 53,060 53,060
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2### 364,486 364,486 364,486 364,486 364,486 364,486 364,486 364,486
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2### 415,137 415,137 415,137 415,137 415,137 415,137 415,137 415,137
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2### 276,675 276,675 276,675 276,675 276,675 276,675 276,675 276,675
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2### 295,688 295,688 295,688 295,688 295,688 295,688 295,688 295,688
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3### 494,840 497,098 498,227 494,840 486,936 481,292 509,518 475,646
8.2 CONCRETO 3500 PSI M3### 433,091 435,158 436,192 433,091 425,854 420,686 446,529 415,517
8.3 CONCRETO 3000 PSI M3### 431,433 433,555 434,617 431,433 424,002 418,696 445,231 413,389
8.4 CONCRETO 2500 PSI M3### 388,291 390,488 391,586 388,291 380,601 375,108 402,572 369,616
8.5 CONCRETO 2000 PSI M3### 364,218 366,451 367,568 364,218 356,402 350,821 378,733 345,238
8.6 CONCRETO 1500 PSI M3### 333,346 335,611 336,743 333,346 325,418 319,756 348,069 314,093
8.7 MORTERO SECO 1:10 M3### 294,284 296,325 297,345 294,284 287,141 282,039 307,550 276,937
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3### 507,943 509,924 510,915 507,943 501,007 496,053 520,824 491,099
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3### 467,268 469,324 470,351 467,268 460,073 454,935 480,630 449,796
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3### 527,040 528,963 529,924 527,040 520,311 515,505 539,537 510,699
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3### 758,440 760,363 761,324 758,440 751,711 746,905 770,937 742,099
9 CARPINTERÍA EN MADERA
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
9.1 BARANDA EN MADERA CEDRO MACHO ML ### i 125,767 125,767 125,767 125,767 125,767 125,767 125,767 125,767
p
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ###
i 4,404 4,419 4,426 4,404 4,352 4,315 4,500 4,278
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2### o 140,665 140,665 140,665 140,665 140,665 140,665 140,665 140,665
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2### 172,342 172,342 172,342 172,342 172,342 172,342 172,342 172,342
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 250,821 250,821 250,821 250,821 250,821 250,821 250,821 250,821
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 279,189 279,189 279,189 279,189 279,189 279,189 279,189 279,189
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 307,590 307,590 307,590 307,590 307,590 307,590 307,590 307,590
9.8 HOJA PUERTA FORTEC 0.81 UN ### 204,317 204,317 204,317 204,317 204,317 204,317 204,317 204,317
9.9 HOJA PUERTA FORTEC 0.91 UN ### 231,644 231,644 231,644 231,644 231,644 231,644 231,644 231,644
9.10 HOJA PUERTA FORTEC 1.50 UN ### 340,950 340,950 340,950 340,950 340,950 340,950 340,950 340,950
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 129,170 129,170 129,170 129,170 129,170 129,170 129,170 129,170
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 171,526 171,526 171,526 171,526 171,526 171,526 171,526 171,526
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 190,654 190,654 190,654 190,654 190,654 190,654 190,654 190,654
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 485,780 485,780 485,780 485,780 485,780 485,780 485,780 485,780
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,949 42,949 42,949 42,949 42,949 42,949 42,949 42,949
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,707 26,707 26,707 26,707 26,707 26,707 26,707 26,707
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2### 101,530 101,530 101,530 101,530 101,530 101,530 101,530 101,530
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 124,241 124,241 124,241 124,241 124,241 124,241 124,241 124,241
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 96,505 96,505 96,505 96,505 96,505 96,505 96,505 96,505
SUMINISTRO E INSTALACIÓN CERRADURA DE POMO
9.20 ENTRADA UN ### 29,883 29,883 29,883 29,883 29,883 29,883 29,883 29,883
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,883 29,883 29,883 29,883 29,883 29,883 29,883 29,883
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,325 28,325 28,325 28,325 28,325 28,325 28,325 28,325
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2### 43,306 43,306 43,306 43,306 43,306 43,306 43,306 43,306
9.24 ESPEJO BISELADO INCOLORO 4 MM M2### 53,657 53,657 53,657 53,657 53,657 53,657 53,657 53,657
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2### 64,696 64,696 64,696 64,696 64,696 64,696 64,696 64,696
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2### 77,806 77,806 77,806 77,806 77,806 77,806 77,806 77,806
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2### 366,787 366,787 366,787 366,787 366,787 366,787 366,787 366,787
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2### 256,387 256,387 256,387 256,387 256,387 256,387 256,387 256,387
9.29 VIDRIO TRANSPARENTE 3 MM M2### 34,336 34,336 34,336 34,336 34,336 34,336 34,336 34,336
9.30 VIDRIO TRANSPARENTE 4 MM M2### 43,996 43,996 43,996 43,996 43,996 43,996 43,996 43,996
9.31 VIDRIO TRANSPARENTE 5 MM M2### 53,657 53,657 53,657 53,657 53,657 53,657 53,657 53,657
9.32 VIDRIO TRANSPARENTE 6 MM M2### 67,456 67,456 67,456 67,456 67,456 67,456 67,456 67,456
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 77,659 77,659 77,659 77,659 77,659 77,659 77,659 77,659
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2### 216,430 216,430 216,430 216,430 216,430 216,430 216,430 216,430
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO i
10.3 DE 1" (INCLUYE ANTICORROSIVO)
ML ### p 82,160 82,160 82,160 82,160 82,160 82,160 82,160 82,160
i
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 146,833
o 146,833 146,833 146,833 146,833 146,833 146,833 146,833
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 139,330 139,330 139,330 139,330 139,330 139,330 139,330 139,330
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2### 91,475 91,475 91,475 91,475 91,475 91,475 91,475 91,475
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 215,695 215,695 215,695 215,695 215,695 215,695 215,695 215,695
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 112,294 112,294 112,294 112,294 112,294 112,294 112,294 112,294
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO
10.10 (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2### 101,203 101,203 101,203 101,203 101,203 101,203 101,203 101,203
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA
10,10(1) CLASICA) H: 2.00 MTS M2### 123,583 123,583 123,583 123,583 123,583 123,583 123,583 123,583
CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC.
10.11 ANTICORROSIVO ML ### 41,675 41,675 41,675 41,675 41,675 41,675 41,675 41,675
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10.12 E=6MM
M2### 552,028 552,028 552,028 552,028 552,028 552,028 552,028 552,028
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2### 198,396 198,396 198,396 198,396 198,396 198,396 198,396 198,396
10.17 PUERTA CORTINA INCLUYE ESMALTE M2### 402,651 402,651 402,651 402,651 402,651 402,651 402,651 402,651
SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC.
10.18 ANTICORROSIVO ML ### 6,152 6,152 6,152 6,152 6,152 6,152 6,152 6,152
10.19 VENTANA EN ALUMINIO CORREDIZA M2### 283,012 283,012 283,012 283,012 283,012 283,012 283,012 283,012
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2### 124,472 124,472 124,472 124,472 124,472 124,472 124,472 124,472
10.21 REJILLA PISO 0.30 M M2### 88,041 88,041 88,041 88,041 88,041 88,041 88,041 88,041
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 90,848 90,848 90,848 90,848 90,848 90,848 90,848 90,848
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS
10.23 DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,756 10,756 10,756 10,756 10,756 10,756 10,756 10,756
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO p
C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.24 COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### i 11,940 11,940 11,940 11,940 11,940 11,940 11,940 11,940
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, o
SUMINISTRO, MONTAJE
11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 225,018 225,018 225,018 225,018 225,018 225,018 225,018 225,018
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 271,641 271,641 271,641 271,641 271,641 271,641 271,641 271,641
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,526 22,526 22,526 22,526 22,526 22,526 22,526 22,526
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,383 35,383 35,383 35,383 35,383 35,383 35,383 35,383
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,918 33,918 33,918 33,918 33,918 33,918 33,918 33,918
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 43,510 43,510 43,510 43,510 43,510 43,510 43,510 43,510
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 89,774 89,774 89,774 89,774 89,774 89,774 89,774 89,774
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 226,411 226,411 226,411 226,411 226,411 226,411 226,411 226,411
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,316 44,316 44,316 44,316 44,316 44,316 44,316 44,316
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 35,670 35,670 35,670 35,670 35,670 35,670 35,670 35,670
11.13 NIPLE PASAMURO 2" UN ### 67,737 67,737 67,737 67,737 67,737 67,737 67,737 67,737
11.14 NIPLE PASAMURO 4" UN ### 101,256 101,256 101,256 101,256 101,256 101,256 101,256 101,256
11.15 PUNTO AGUA CALIENTE CPVC UN ### 85,563 85,563 85,563 85,563 85,563 85,563 85,563 85,563
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 62,280 62,280 62,280 62,280 62,280 62,280 62,280 62,280
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 66,279 66,279 66,279 66,279 66,279 66,279 66,279 66,279
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 83,761 83,761 83,761 83,761 83,761 83,761 83,761 83,761
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 67,597 67,597 67,597 67,597 67,597 67,597 67,597 67,597
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 84,667 84,667 84,667 84,667 84,667 84,667 84,667 84,667
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 90,582 90,582 90,582 90,582 90,582 90,582 90,582 90,582
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 75,184 75,184 75,184 75,184 75,184 75,184 75,184 75,184
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,731 12,731 12,731 12,731 12,731 12,731 12,731 12,731
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,941 17,941 17,941 17,941 17,941 17,941 17,941 17,941
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,422 23,422 23,422 23,422 23,422 23,422 23,422 23,422
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
11.26 RED SUMINISTRO PVC 1" ML ### i 14,457 14,457 14,457 14,457 14,457 14,457 14,457 14,457
p
11.27 RED SUMINISTRO PVC 1/2" ML ###
i 8,629 8,629 8,629 8,629 8,629 8,629 8,629 8,629
11.28 RED SUMINISTRO PVC 2 1/2" ML ### o 52,212 52,212 52,212 52,212 52,212 52,212 52,212 52,212
11.29 RED SUMINISTRO PVC 2" ML ### 33,386 33,386 33,386 33,386 33,386 33,386 33,386 33,386
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,811 10,811 10,811 10,811 10,811 10,811 10,811 10,811
11.31 RED SANITARIA PVC-S 2" ML ### 25,774 25,774 25,774 25,774 25,774 25,774 25,774 25,774
11.32 RED SANITARIA PVC-S 3" ML ### 35,771 35,771 35,771 35,771 35,771 35,771 35,771 35,771
11.33 RED SANITARIA PVC-S 4" ML ### 48,552 48,552 48,552 48,552 48,552 48,552 48,552 48,552
11.34 RED SANITARIA PVC-S 6" ML ### 90,847 90,847 90,847 90,847 90,847 90,847 90,847 90,847
11.35 REGISTRO 1" UN ### 110,247 110,247 110,247 110,247 110,247 110,247 110,247 110,247
11.36 REGISTRO 1/2" UN ### 61,445 61,445 61,445 61,445 61,445 61,445 61,445 61,445
11.37 REGISTRO 3/4" UN ### 78,278 78,278 78,278 78,278 78,278 78,278 78,278 78,278
11.38 REGISTRO 1 1/2" UN ### 189,220 189,220 189,220 189,220 189,220 189,220 189,220 189,220
11.39 REGISTRO 2 1/2" UN ### 390,407 390,407 390,407 390,407 390,407 390,407 390,407 390,407
11.40 REGISTRO 2" UN ### 288,365 288,365 288,365 288,365 288,365 288,365 288,365 288,365
11.41 REVENTILACIÓN 2" ML ### 17,960 17,960 17,960 17,960 17,960 17,960 17,960 17,960
11.42 REVENTILACIÓN 3" ML ### 22,670 22,670 22,670 22,670 22,670 22,670 22,670 22,670
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN) UN ### 176,352 176,352 176,352 176,352 176,352 176,352 176,352 176,352
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11.44 ISNTALACIÓN) UN ### 287,239 287,239 287,239 287,239 287,239 287,239 287,239 287,239
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11.45 INSTALACIÓN) UN ### 478,133 478,133 478,133 478,133 478,133 478,133 478,133 478,133
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE
11.46 ACCESORIOS Y SOPORTES) ML ### 41,349 41,349 41,349 41,349 41,349 41,349 41,349 41,349
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11.47 ACCESORIOS Y SOPORTES) ML ### 48,765 48,765 48,765 48,765 48,765 48,765 48,765 48,765
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE
11.48 ACCESORIOS Y SOPORTES) ML ### 62,497 62,497 62,497 62,497 62,497 62,497 62,497 62,497
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE
11.49 ACCESORIOS Y SOPORTES) ML ### 70,942 70,942 70,942 70,942 70,942 70,942 70,942 70,942
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11.50 ACCESORIOS Y SOPORTES) ML ### 91,431 91,431 91,431 91,431 91,431 91,431 91,431 91,431
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,935 62,935 62,935 62,935 62,935 62,935 62,935 62,935
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### i 63,193 63,193 63,193 63,193 63,193 63,193 63,193 63,193
p
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### i 40,806 40,806 40,806 40,806 40,806 40,806 40,806 40,806
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### o 50,316 50,316 50,316 50,316 50,316 50,316 50,316 50,316
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO
11.57 DE HASTA 2" ML ### 4,267 4,267 4,267 4,267 4,267 4,267 4,267 4,267
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 371,867 371,867 371,867 371,867 371,867 371,867 371,867 371,867
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,088 59,088 59,088 59,088 59,088 59,088 59,088 59,088
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 69,964 69,964 69,964 69,964 69,964 69,964 69,964 69,964
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 77,663 77,663 77,663 77,663 77,663 77,663 77,663 77,663
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 91,490 91,490 91,490 91,490 91,490 91,490 91,490 91,490
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,547 55,547 55,547 55,547 55,547 55,547 55,547 55,547
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 63,323 63,323 63,323 63,323 63,323 63,323 63,323 63,323
12.8 STRIP TELEFÓNICO 10 PARES UN ### 146,064 146,064 146,064 146,064 146,064 146,064 146,064 146,064
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 57,039 57,039 57,039 57,039 57,039 57,039 57,039 57,039
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 131,106 131,106 131,106 131,106 131,106 131,106 131,106 131,106
12.11 SALIDA T.V PVC COMPLETA. UN ### 78,400 78,400 78,400 78,400 78,400 78,400 78,400 78,400
12.12 SALIDA BIFÁSICA C.N. UN ### 46,486 46,486 46,486 46,486 46,486 46,486 46,486 46,486
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 97,934 97,934 97,934 97,934 97,934 97,934 97,934 97,934
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 418,108 418,108 418,108 418,108 418,108 418,108 418,108 418,108
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 557,020 557,020 557,020 557,020 557,020 557,020 557,020 557,020
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,607 3,607 3,607 3,607 3,607 3,607 3,607 3,607
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,762 4,762 4,762 4,762 4,762 4,762 4,762 4,762
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,411 7,411 7,411 7,411 7,411 7,411 7,411 7,411
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,255 13,255 13,255 13,255 13,255 13,255 13,255 13,255
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### p 278,573 278,573 278,573 278,573 278,573 278,573 278,573 278,573
i
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### o 78,672 78,672 78,672 78,672 78,672 78,672 78,672 78,672
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 106,569 106,569 106,569 106,569 106,569 106,569 106,569 106,569
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 43,377 43,377 43,377 43,377 43,377 43,377 43,377 43,377
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,427,092 1,427,092 1,427,092 1,427,092 1,427,092 1,427,092 1,427,092 1,427,092
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,057,537 1,057,537 1,057,537 1,057,537 1,057,537 1,057,537 1,057,537 1,057,537
12.26 POSTE METÁLICO 6M UN ### 1,324,457 1,324,457 1,324,457 1,324,457 1,324,457 1,324,457 1,324,457 1,324,457
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE
12.27 LUMINARIA) UN ### 616,641 616,641 616,641 616,641 616,641 616,641 616,641 616,641
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 112,433 112,433 112,433 112,433 112,433 112,433 112,433 112,433
12.29 LUMINARIA 70W SODIO UN ### 517,408 517,408 517,408 517,408 517,408 517,408 517,408 517,408
12.30 LUMINARIA 150W SODIO UN ### 647,381 647,381 647,381 647,381 647,381 647,381 647,381 647,381
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,710,277 1,710,277 1,710,277 1,710,277 1,710,277 1,710,277 1,710,277 1,710,277
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,259,389 1,259,389 1,259,389 1,259,389 1,259,389 1,259,389 1,259,389 1,259,389
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2### 42,081 42,155 42,192 42,081 41,822 41,637 42,561 41,452
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2### 41,866 41,940 41,977 41,866 41,608 41,423 42,347 41,238
13.3 ALISTADO PARA LISTÓN M2### 15,255 15,270 15,277 15,255 15,203 15,166 15,351 15,129
13.4 ALISTADO PISOS 1:3, E=0.04 M2### 31,743 31,891 31,965 31,743 31,226 30,856 32,705 30,486
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2### 90,202 90,350 90,424 90,202 89,684 89,314 91,163 88,945
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,585 27,629 27,652 27,585 27,428 27,317 27,875 27,205
13.7 CONCRETO BASE GRADAS 2500 PSI M2### 61,631 61,851 61,960 61,631 60,862 60,313 63,059 59,763
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2### 86,183 86,535 86,710 86,183 84,953 84,074 88,468 83,195
13.9 MANTO FIBERGLASS 600X1 M2### 31,096 31,096 31,096 31,096 31,096 31,096 31,096 31,096
13.10 PEGANTE MORTERO-CONCRETO M2### 23,451 23,451 23,451 23,451 23,451 23,451 23,451 23,451
13.11 PERMA PLY 2 CAPAS M2### 27,503 27,503 27,503 27,503 27,503 27,503 27,503 27,503
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2### 50,442 50,639 50,738 50,442 49,750 49,255 51,727 48,761
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2### 59,249 59,491 59,612 59,249 58,403 57,799 60,820 57,195
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2### 86,243 86,617 86,803 86,243 84,936 84,002 88,671 83,068
13.15 TRITURADO FINO 1/2 M3### 118,355 119,878 120,639 118,355 113,024 109,217 128,254 105,410
13.16 TRITURADO GRUESO 3/4 M3### 124,274 127,564 123,040 119,896 115,739 108,506 122,780 105,254
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2### 59,216 59,246 59,260 59,216 59,113 59,039 59,408 58,965
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA
14.2 ML ### p 35,280 35,295 35,303 35,280 35,229 35,192 35,377 35,155
(LINEAL)
i
14.3 ADOQUÍN CONCRETO 6CM M2### o 68,498 68,572 68,609 68,498 68,240 68,055 68,979 67,870
14.4 ADOQUÍN CONCRETO 8CM M2### 71,898 71,972 72,009 71,898 71,640 71,455 72,379 71,270
14.5 ADOQUÍN GRES PEATONAL M2### 76,297 76,371 76,407 76,297 76,038 75,853 76,777 75,668
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE
14.6 FONDO BLANCO. INCLUYE ALISTADO M2### 77,972 78,002 78,016 77,972 77,868 77,795 78,164 77,721
14.7 GRAVILLA PARA GRADAS ML ### 38,142 38,170 38,184 38,142 38,042 37,972 38,326 37,901
ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y
14.8 PULIDA) M2### 171,230 171,363 171,430 171,230 170,764 170,431 172,095 170,099
14.9 ACABADO EN GRAVILLA LAVADA M2### 48,286 48,358 48,393 48,286 48,036 47,857 48,751 47,679
14.10 GUARDAESCOBA EN GRANITO ML ### 44,740 44,740 44,740 44,740 44,740 44,740 44,740 44,740
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,766 10,795 10,809 10,766 10,667 10,596 10,951 10,525
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,655 9,655 9,655 9,655 9,655 9,655 9,655 9,655
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,965 12,965 12,965 12,965 12,965 12,965 12,965 12,965
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,785 10,785 10,785 10,785 10,785 10,785 10,785 10,785
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,102 18,102 18,102 18,102 18,102 18,102 18,102 18,102
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,318 35,318 35,318 35,318 35,318 35,318 35,318 35,318
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,395 9,395 9,395 9,395 9,395 9,395 9,395 9,395
14.18 LISTÓN M.H. AMARILLO M2### 76,285 76,285 76,285 76,285 76,285 76,285 76,285 76,285
14.19 PASO ESCALERA GRANITO ML ### 123,614 123,718 123,769 123,614 123,252 122,993 124,287 122,734
14.20 PIRLANES ALUMINIO ML ### 7,668 7,668 7,668 7,668 7,668 7,668 7,668 7,668
14.21 PIRLANES LADRILLO ML ### 33,416 33,446 33,461 33,416 33,313 33,239 33,609 33,165
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2### 47,176 47,176 47,176 47,176 47,176 47,176 47,176 47,176
14.23 PISO VINILO TRÁFICO PESADO M2### 54,851 54,851 54,851 54,851 54,851 54,851 54,851 54,851
14.24 PULIDA LACADA PISO MADERA M2### 50,379 50,379 50,379 50,379 50,379 50,379 50,379 50,379
14.25 TABLETA DE GRES 25X25 M2### 51,431 51,460 51,475 51,431 51,327 51,253 51,623 51,179
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2### 57,679 57,708 57,723 57,679 57,575 57,501 57,871 57,427
GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO
14.27 BLANCO ML ### 11,174 11,174 11,174 11,174 11,174 11,174 11,174 11,174
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2### 51,880 51,925 51,947 51,880 51,725 51,614 52,169 51,503
14.29 JABONERA PORCELANA ACUARIO UN ### 21,184 21,184 21,184 21,184 21,184 21,184 21,184 21,184
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 126,874 126,874 126,874 126,874 126,874 126,874 126,874 126,874
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,155 10,155 10,155 10,155 10,155 10,155 10,155 10,155
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,110 23,110 23,110 23,110 23,110 23,110 23,110 23,110
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,800 14,800 14,800 14,800 14,800 14,800 14,800 14,800
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,377 14,377 14,377 14,377 14,377 14,377 14,377 14,377
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
14.35 REMATES BOCEL ALUMINIO ML ### i 8,717 8,717 8,717 8,717 8,717 8,717 8,717 8,717
p
14.36 REMATES BOCEL PORCELANA ML ###
i 8,873 8,873 8,873 8,873 8,873 8,873 8,873 8,873
14.37 TAPA REGISTRO 20X20 UN ### o 19,568 19,568 19,568 19,568 19,568 19,568 19,568 19,568
14.38 TAPA REGISTRO 6X6 UN ### 17,826 17,826 17,826 17,826 17,826 17,826 17,826 17,826
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE
14.39 MÁRMOL N.5
M2### 19,265 19,265 19,265 19,265 19,265 19,265 19,265 19,265
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE
14.40 MÁRMOL FUNDIDO EN SITIO M2### 22,271 22,271 22,271 22,271 22,271 22,271 22,271 22,271
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2### 67,696 67,725 67,740 67,696 67,592 67,518 67,888 67,444
14.42 MEDIA CAÑA EN GRANITO ML ### 79,808 79,808 79,808 79,808 79,808 79,808 79,808 79,808
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2### 34,717 34,717 34,717 34,717 34,717 34,717 34,717 34,717
14.44 PINTURA ACRÍLICA PARA PISOS M2### 13,609 13,609 13,609 13,609 13,609 13,609 13,609 13,609
PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS
14.45 DEPORTIVOS M2### 104,915 104,915 104,915 104,915 104,915 104,915 104,915 104,915
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2### 126,906 126,906 126,906 126,906 126,906 126,906 126,906 126,906
15 CIELO RASO
15.1 APLIQUE YESO ML ### 74,971 74,971 74,971 74,971 74,971 74,971 74,971 74,971
15.2 ARMADURA MADERA Y MALLA M2### 36,668 36,668 36,668 36,668 36,668 36,668 36,668 36,668
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2### 56,838 56,838 56,838 56,838 56,838 56,838 56,838 56,838
15.4 CIELO RASO DURACUSTIC M2### 69,806 69,806 69,806 69,806 69,806 69,806 69,806 69,806
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2### 52,078 52,078 52,078 52,078 52,078 52,078 52,078 52,078
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2### 96,677 96,677 96,677 96,677 96,677 96,677 96,677 96,677
15.7 CORNISAS YESO ML ### 50,338 50,338 50,338 50,338 50,338 50,338 50,338 50,338
LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE
15.8 APOYO) M2### 106,918 106,918 106,918 106,918 106,918 106,918 106,918 106,918
15.9 MALLA CON VENA M2### 13,725 13,725 13,725 13,725 13,725 13,725 13,725 13,725
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3### 5,627 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE
16.2 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 18,479 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3### 25,905 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M
16.4 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3### 43,707 43,707 43,707 43,707 43,707 43,707 43,707 43,707
DE 5 KM)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M i
16.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3### p 49,987 49,987 49,987 49,987 49,987 49,987 49,987 49,987
DE 5 KM) i
o
EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN
16.6 EXPLOSIVOS) M3### 85,005 85,005 85,005 85,005 85,005 85,005 85,005 85,005
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3### 117,553 119,045 119,790 117,553 112,334 108,605 127,248 104,876
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3### 184,461 193,028 174,181 169,041 163,901 146,767 165,614 155,334
16.11 AFRIMADO (NORMA INVIAS 311) M3### 94,156 99,296 78,735 77,022 71,882 68,455 82,162 61,601
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3### 147,202 154,055 135,208 131,781 126,641 109,507 128,354 118,074
16.13 BASE GRANULAR (NORMA INVIAS 330) M3### 181,431 189,998 171,150 166,010 160,870 143,736 162,583 152,303
17 APARATOS SANITARIOS
SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE
17.1 GRIFERÍA) UN ### 310,749 310,749 310,749 310,749 310,749 310,749 310,749 310,749
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO
17.2 (INCLUYE GRIFERÍA) UN ### 916,918 916,918 916,918 916,918 916,918 916,918 916,918 916,918
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE
17.3 GRIFERÍA)
UN ### 496,626 496,626 496,626 496,626 496,626 496,626 496,626 496,626
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE
17.4 GRIFERÍA) UN ### 143,580 143,580 143,580 143,580 143,580 143,580 143,580 143,580
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL
17.5 (INCLUYE GRIFERÍA) UN ### 201,307 201,307 201,307 201,307 201,307 201,307 201,307 201,307
SUMINISTRO E INSTALACIÓN LAVAMANOS DE
17.6 EMPOTRAR(INCLUYE GRIFERÍA) UN ### 186,919 186,919 186,919 186,919 186,919 186,919 186,919 186,919
SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE
17.7 GRIFERÍA) UN ### 412,050 412,050 412,050 412,050 412,050 412,050 412,050 412,050
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO
17.8 (INCLUYE GRIFERÍA)
UN ### 1,054,562 1,054,562 1,054,562 1,054,562 1,054,562 1,054,562 1,054,562 1,054,562
SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE
17.9 GRIFERÍA) UN ### 299,192 299,192 299,192 299,192 299,192 299,192 299,192 299,192
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN
17.10 SALIDA A BAÑERA UN ### 211,759 211,759 211,759 211,759 211,759 211,759 211,759 211,759
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### p 83,996 83,996 83,996 83,996 83,996 83,996 83,996 83,996
i
o
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN
17.12 ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y UN ### 256,563 256,563 256,563 256,563 256,563 256,563 256,563 256,563
GRIFERÍA)
18 PINTURAS
IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O
18.1 SIMILAR M2### 8,506 8,506 8,506 8,506 8,506 8,506 8,506 8,506
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,158 3,158 3,158 3,158 3,158 3,158 3,158 3,158
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2### 11,306 11,306 11,306 11,306 11,306 11,306 11,306 11,306
18.4 BARNIZ SOBRE MUEBLES M2### 43,140 43,140 43,140 43,140 43,140 43,140 43,140 43,140
18.5 CARBURO SOBRE PAÑETES M2### 5,928 5,928 5,928 5,928 5,928 5,928 5,928 5,928
18.6 COLORPLAST FACHADA SOBRE FACHADA M2### 67,593 67,593 67,593 67,593 67,593 67,593 67,593 67,593
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,522 3,522 3,522 3,522 3,522 3,522 3,522 3,522
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,831 2,831 2,831 2,831 2,831 2,831 2,831 2,831
18.9 ESMALTE SOBRE LÁMINA LLENA M2### 14,195 14,195 14,195 14,195 14,195 14,195 14,195 14,195
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,115 4,115 4,115 4,115 4,115 4,115 4,115 4,115
18.11 ESMALTE SOBRE MADERA LLENA M2### 14,969 14,969 14,969 14,969 14,969 14,969 14,969 14,969
18.12 ESMALTE SOBRE MARCOS LÁMINA M2### 5,882 5,882 5,882 5,882 5,882 5,882 5,882 5,882
18.13 ESMALTE SOBRE MARCOS MADERA M2### 6,688 6,688 6,688 6,688 6,688 6,688 6,688 6,688
18.14 ESTUCO M2### 7,122 7,122 7,122 7,122 7,122 7,122 7,122 7,122
18.15 ESTUCO (LINEAL) ML ### 4,456 4,456 4,456 4,456 4,456 4,456 4,456 4,456
18.16 ESTUCO Y VINILO 3 MANOS M2### 15,793 15,793 15,793 15,793 15,793 15,793 15,793 15,793
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,775 9,775 9,775 9,775 9,775 9,775 9,775 9,775
18.18 LACA PISOS MADERA M2### 23,102 23,102 23,102 23,102 23,102 23,102 23,102 23,102
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,731 2,731 2,731 2,731 2,731 2,731 2,731 2,731
18.20 MARMOLINA SOBRE PAÑETE M2### 12,456 12,456 12,456 12,456 12,456 12,456 12,456 12,456
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,359 3,359 3,359 3,359 3,359 3,359 3,359 3,359
18.22 TINTILLA SOBRE MADERA LLENA M2### 12,832 12,832 12,832 12,832 12,832 12,832 12,832 12,832
18.23 VINILO SOBRE PAÑETE 2 MANOS M2### 7,211 7,211 7,211 7,211 7,211 7,211 7,211 7,211
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,526 4,526 4,526 4,526 4,526 4,526 4,526 4,526
18.25 WASH-PRIMER SOBRE ALUMNIO M2### 22,294 22,294 22,294 22,294 22,294 22,294 22,294 22,294
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
18.26 PINTURA EPÓXICA M2### i 12,891 12,891 12,891 12,891 12,891 12,891 12,891 12,891
p
18.27 PINTURA EPÓXICA (LINEAL) ML ###
i 7,955 7,955 7,955 7,955 7,955 7,955 7,955 7,955
o
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,247,372 6,247,372 6,247,372 6,247,372 6,247,372 6,247,372 6,247,372 6,247,372
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### ### 11,038,120 ### 11,038,120 ### 11,038,120 11,038,120 ###
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,888,629 2,888,629 2,888,629 2,888,629 2,888,629 2,888,629 2,888,629 2,888,629
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO
19.4 (PAR) UN ### 9,440,373 9,440,373 9,440,373 9,440,373 9,440,373 9,440,373 9,440,373 9,440,373
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,840,971 8,840,971 8,840,971 8,840,971 8,840,971 8,840,971 8,840,971 8,840,971
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,731 2,731 2,731 2,731 2,731 2,731 2,731 2,731
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 886,184 886,184 886,184 886,184 886,184 886,184 886,184 886,184
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 88,598 88,598 88,598 88,598 88,598 88,598 88,598 88,598
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,604,566 1,604,589 1,604,600 1,604,566 1,604,487 1,604,431 1,604,713 1,604,375
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 700,381 700,911 701,177 700,381 698,523 697,196 703,830 695,870
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 636,782 636,782 636,782 636,782 636,782 636,782 636,782 636,782
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### o 9,712 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 93,196 93,196 93,196 93,196 93,196 93,196 93,196 93,196
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 525,112 525,112 525,112 525,112 525,112 525,112 525,112 525,112
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,120,811 1,120,811 1,120,811 1,120,811 1,120,811 1,120,811 1,120,811 1,120,811
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 128,452 128,452 128,452 128,452 128,452 128,452 128,452 128,452
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 782,724 782,724 782,724 782,724 782,724 782,724 782,724 782,724
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,684,642 1,684,642 1,684,642 1,684,642 1,684,642 1,684,642 1,684,642 1,684,642
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,386 13,386 13,386 13,386 13,386 13,386 13,386 13,386
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,525 16,525 16,525 16,525 16,525 16,525 16,525 16,525
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,764 20,764 20,764 20,764 20,764 20,764 20,764 20,764
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,732 22,732 22,732 22,732 22,732 22,732 22,732 22,732
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,264 27,264 27,264 27,264 27,264 27,264 27,264 27,264
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,264 27,264 27,264 27,264 27,264 27,264 27,264 27,264
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 109,799 109,799 109,799 109,799 109,799 109,799 109,799 109,799
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 127,172 127,172 127,172 127,172 127,172 127,172 127,172 127,172
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 393,595 393,595 393,595 393,595 393,595 393,595 393,595 393,595
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 147,810 147,810 147,810 147,810 147,810 147,810 147,810 147,810
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 243,663 243,663 243,663 243,663 243,663 243,663 243,663 243,663
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,078,396 1,078,396 1,078,396 1,078,396 1,078,396 1,078,396 1,078,396 1,078,396
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,242,492 1,242,492 1,242,492 1,242,492 1,242,492 1,242,492 1,242,492 1,242,492
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,540 14,540 14,540 14,540 14,540 14,540 14,540 14,540
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,825 12,825 12,825 12,825 12,825 12,825 12,825 12,825
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,762 31,762 31,762 31,762 31,762 31,762 31,762 31,762
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 125,905 125,905 125,905 125,905 125,905 125,905 125,905 125,905
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 187,550 187,550 187,550 187,550 187,550 187,550 187,550 187,550
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,621 30,621 30,621 30,621 30,621 30,621 30,621 30,621
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 105,530 105,530 105,530 105,530 105,530 105,530 105,530 105,530
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 156,439 156,439 156,439 156,439 156,439 156,439 156,439 156,439
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,962 30,962 30,962 30,962 30,962 30,962 30,962 30,962
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 63,853 63,853 63,853 63,853 63,853 63,853 63,853 63,853
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 257,304 257,304 257,304 257,304 257,304 257,304 257,304 257,304
1.32 UNIÓN REPARACION PVC 4" UN ### 74,512 74,512 74,512 74,512 74,512 74,512 74,512 74,512
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 299,386 299,386 299,386 299,386 299,386 299,386 299,386 299,386
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### i 179,346 179,346 179,346 179,346 179,346 179,346 179,346 179,346
p
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 510,899
i 510,899 510,899 510,899 510,899 510,899 510,899 510,899
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### o1,369,010 1,369,010 1,369,010 1,369,010 1,369,010 1,369,010 1,369,010 1,369,010
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,022,891 2,022,891 2,022,891 2,022,891 2,022,891 2,022,891 2,022,891 2,022,891
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2### 10,909 10,909 10,909 10,909 10,909 10,909 10,909 10,909
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2### 24,915 24,915 24,915 24,915 24,915 24,915 24,915 24,915
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3### 95,488 96,874 97,568 95,488 90,635 87,169 104,500 83,703
2.5 RELLENO TIPO 2 "RECEBO" M3### 99,612 108,179 85,905 80,765 82,478 65,344 56,777 65,344
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3### 99,216 104,356 83,795 82,082 76,942 73,515 87,222 66,661
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3### 116,391 122,540 111,267 109,217 106,142 98,969 106,142 99,993
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3### 83,673 89,941 78,449 76,359 73,225 69,046 79,494 66,957
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3### 139,885 141,808 142,768 139,885 133,156 128,350 152,382 123,544
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 117,376 117,376 117,376 117,376 117,376 117,376 117,376 117,376
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,224,198 1,224,198 1,224,198 1,224,198 1,224,198 1,224,198 1,224,198 1,224,198
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 153,406 153,406 153,406 153,406 153,406 153,406 153,406 153,406
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,417,942 1,417,942 1,417,942 1,417,942 1,417,942 1,417,942 1,417,942 1,417,942
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 988,259 988,259 988,259 988,259 988,259 988,259 988,259 988,259
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,961 62,961 62,961 62,961 62,961 62,961 62,961 62,961
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 116,517 116,517 116,517 116,517 116,517 116,517 116,517 116,517
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 275,181 275,181 275,181 275,181 275,181 275,181 275,181 275,181
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 275,175 275,175 275,175 275,175 275,175 275,175 275,175 275,175
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 441,808 441,808 441,808 441,808 441,808 441,808 441,808 441,808
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 116,566 116,566 116,566 116,566 116,566 116,566 116,566 116,566
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 116,566 116,566 116,566 116,566 116,566 116,566 116,566 116,566
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 275,181 275,181 275,181 275,181 275,181 275,181 275,181 275,181
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 275,181 275,181 275,181 275,181 275,181 275,181 275,181 275,181
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 441,808 441,808 441,808 441,808 441,808 441,808 441,808 441,808
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 443,352 443,352 443,352 443,352 443,352 443,352 443,352 443,352
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 720,114 720,114 720,114 720,114 720,114 720,114 720,114 720,114
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,155,829 1,155,829 1,155,829 1,155,829 1,155,829 1,155,829 1,155,829 1,155,829
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 71,412 71,412 71,412 71,412 71,412 71,412 71,412 71,412
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 370,937 370,937 370,937 370,937 370,937 370,937 370,937 370,937
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24"
i
ML ### 416,142 416,142 416,142 416,142 416,142 416,142 416,142 416,142
p
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### i 1,151,693 1,151,693 1,151,693 1,151,693 1,151,693 1,151,693 1,151,693 1,151,693
o
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 67,785 67,805 67,815 67,785 67,716 67,666 67,914 67,617
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 336,235 336,235 336,235 336,235 336,235 336,235 336,235 336,235
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 51,182 51,182 51,182 51,182 51,182 51,182 51,182 51,182
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 72,402 72,402 72,402 72,402 72,402 72,402 72,402 72,402
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 104,501 104,501 104,501 104,501 104,501 104,501 104,501 104,501
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 160,420 160,420 160,420 160,420 160,420 160,420 160,420 160,420
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 257,854 257,854 257,854 257,854 257,854 257,854 257,854 257,854
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 374,010 374,010 374,010 374,010 374,010 374,010 374,010 374,010
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 473,340 473,340 473,340 473,340 473,340 473,340 473,340 473,340
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 622,382 622,382 622,382 622,382 622,382 622,382 622,382 622,382
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 856,203 856,203 856,203 856,203 856,203 856,203 856,203 856,203
5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2### i 76,830 76,934 76,985 76,830 76,468 76,209 77,503 75,950
p
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2###
i 90,662 90,766 90,817 90,662 90,300 90,041 91,335 89,782
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2### o 59,846 60,077 60,192 59,846 59,039 58,462 61,346 57,886
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2### 64,376 64,599 64,711 64,376 63,596 63,039 65,825 62,482
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2### 64,550 64,768 64,876 64,550 63,791 63,248 65,961 62,705
5.6 BORDE SEPARADOR VERDE A-170 ML ### 259,827 259,865 259,885 259,827 259,692 259,596 260,077 259,500
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,929 18,956 18,970 18,929 18,832 18,763 19,109 18,693
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 42,770 42,932 43,014 42,770 42,201 41,794 43,827 41,388
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 85,250 85,270 85,280 85,250 85,178 85,126 85,383 85,075
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 571,664 572,161 572,410 571,664 569,923 568,680 574,897 567,437
5.11 LOSETA PREFABRICADA A-40 M2### 65,180 65,268 65,312 65,180 64,872 64,652 65,752 64,432
5.12 LOSETA PREFABRICADA A-60 M2### 94,067 94,155 94,199 94,067 93,759 93,539 94,639 93,319
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE
5.13 3000 PSI ML ### 34,942 35,031 35,075 34,942 34,629 34,407 35,521 34,184
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 208,024 208,130 208,183 208,024 207,652 207,387 208,714 207,122
6.2 BANCA EN CONCRETO M-30 UN ### 681,503 681,652 681,726 681,503 680,983 680,612 682,469 680,240
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 218,873 218,895 218,906 218,873 218,795 218,739 219,018 218,683
6.4 BOLARDO M-60 CONCRETO UN ### 166,261 166,388 166,452 166,261 165,815 165,497 167,089 165,178
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 168,128 168,256 168,320 168,128 167,683 167,364 168,956 167,046
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 197,096 197,230 197,297 197,096 196,627 196,292 197,967 195,957
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 61,313 61,392 61,432 61,313 61,035 60,837 61,828 60,639
6.8 BORDILLO PREFABRICADO A-80 ML ### 71,202 71,291 71,336 71,202 70,892 70,670 71,779 70,448
6.9 CANECA M-120 UN ### 318,370 318,390 318,400 318,370 318,301 318,251 318,499 318,202
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 839,081 839,145 839,177 839,081 838,858 838,699 839,495 838,540
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,443,277 3,443,320 3,443,341 3,443,277 3,443,129 3,443,022 3,443,553 3,442,916
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,542,177 3,542,220 3,542,241 3,542,177 3,542,029 3,541,922 3,542,453 3,541,816
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 495,592 495,637 495,659 495,592 495,436 495,325 495,883 495,213
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 658,095 658,273 658,363 658,095 657,469 657,023 659,256 656,576
6.15 BANCA EN MADERA M-50 UN ### 544,569 544,569 544,569 544,569 544,569 544,569 544,569 544,569
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### i 252,778 252,841 252,873 252,778 252,555 252,395 253,192 252,236
p
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 587,508
i 587,558 587,583 587,508 587,335 587,211 587,830 587,087
6.18 POSTE HISTÓRICO M-131 UN ### o6,548,636 6,548,955 6,549,114 6,548,636 6,547,522 6,546,726 6,550,706 6,545,930
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,113 4,113 4,113 4,113 4,113 4,113 4,113 4,113
7.2 MARCA VIAL CON PINTURA EN FRÍO M2### 44,032 44,032 44,032 44,032 44,032 44,032 44,032 44,032
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 319,585 319,604 319,613 319,585 319,517 319,469 319,710 319,421
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 503,803 503,892 503,937 503,803 503,490 503,267 504,383 503,043
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 238,678 238,697 238,707 238,678 238,610 238,562 238,803 238,514
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 253,516 253,535 253,545 253,516 253,448 253,400 253,641 253,352
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 264,753 264,772 264,782 264,753 264,685 264,637 264,878 264,589
7.8 TACHAS REFLECTIVAS UN ### 13,778 13,778 13,778 13,778 13,778 13,778 13,778 13,778
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,716 14,716 14,716 14,716 14,716 14,716 14,716 14,716
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
ELEVACIONES M3### 400,563 405,066 399,937 396,872 390,601 385,144 407,163 380,739
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3### 406,363 410,845 405,704 402,673 396,477 391,073 412,823 386,723
CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA
4.28 630 P ELEVACIONES M3### 415,006 419,488 414,347 411,316 405,120 399,716 421,466 395,366
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3### 550,172 552,391 553,500 550,172 542,405 536,857 564,596 531,310
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3### 645,781 648,088 649,241 645,781 637,706 631,939 660,776 626,172
4.31 681.1 GAVIÓN M3### 206,512 214,816 199,593 196,825 192,673 187,138 200,977 184,370
4.32 681.1 GAVIÓN MALLA PVC M3### 210,748 219,051 203,828 201,061 196,909 191,373 205,212 188,605
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3### 162,433 167,375 147,605 145,958 141,015 137,720 150,900 131,130
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3### 561,091 563,398 564,551 561,091 553,016 547,249 576,086 541,482
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
4.56 682.1 P COLCHONETA RENO M3### i 222,498 230,802 215,579 212,811 208,659 203,124 216,963 200,356
p
4.57 *** TRINCHO EN MADERA M2###
i 69,017 69,017 69,017 69,017 69,017 69,017 69,017 69,017
o
NORMA SEÑALIZACIÓN
5 INV
5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,113 4,113 4,113 4,113 4,113 4,113 4,113 4,113
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2### 44,032 44,032 44,032 44,032 44,032 44,032 44,032 44,032
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 85,106 85,106 85,106 85,106 85,106 85,106 85,106 85,106
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 70,787 70,787 70,787 70,787 70,787 70,787 70,787 70,787
5.5 730.1 DEFENSA METÁLICA ML ### 151,210 151,310 151,360 151,210 150,860 150,610 151,860 150,360
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
UNIDIRECCIONALES UN ### 13,778 13,778 13,778 13,778 13,778 13,778 13,778 13,778
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMEND
FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
CONSTRUCCIÓN
ABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
CONSTRUCCIÓNp
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2
o
UN ### 2,093,398 2,065,343 2,076,717 2,098,706 2,107,047
1.2 CAMPAMENTO 9 M2 UN ### 1,217,209 1,203,182 1,208,869 1,219,863 1,224,034
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,576 14,576 14,576 14,576 14,576
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,344 16,344 16,344 16,344 16,344
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,879 18,879 18,879 18,879 18,879
1.6 CERCA EN TABLA H=2.30 M ML ### 69,115 69,115 69,115 69,115 69,115
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 48,516 48,208 48,333 48,575 48,666
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,368 22,060 22,185 22,426 22,518
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 954,129 949,258 950,507 953,219 953,836
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,910 10,910 10,910 10,910 10,910
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,949 3,949 3,949 3,949 3,949
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,839,532 2,839,532 2,839,532 2,839,532 2,839,532
1.44 RED TELEFÓNICA PROVISIONAL UN ### 261,262 261,262 261,262 261,262 261,262
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 105,381 74,540 74,540 79,680 74,540
2.2 BASE ARENA CEMENTO 1:20 M3 ### 226,430 195,317 207,930 232,316 241,566
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 23,314 23,314 23,314 23,314 23,314
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 667,894 637,756 649,974 673,597 682,557
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 670,021 638,642 651,363 675,957 685,285
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 623,085 593,703 605,614 628,644 637,379
2.9 PILOTE DE MADERA D=20 CM ML ### 50,273 50,273 50,273 50,273 50,273
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.10 MENOR DE 5 KM) ML ### 155,140 155,140 155,140 155,140 155,140
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.11 MENOR DE 5 KM) ML ### 195,386 195,386 195,386 195,386 195,386
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 MENOR DE 5 KM) ML ### 244,055 244,055 244,055 244,055 244,055
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.13 MENOR DE 5 KM) ML ### 309,572 309,572 309,572 309,572 309,572
2.14 PILOTE HINCADO 25X25 ML ### 108,060 105,907 106,780 108,467 109,107
2.15 PILOTE HINCADO 30X30 ML ### 134,029 130,910 132,174 134,620 135,547
2.16 DADOS EN CONCRETO 3500PSI M3 ### 608,936 579,554 591,465 614,495 623,229
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.17 KM) ML ### 92,943 92,943 92,943 92,943 92,943
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,869,122 1,836,829 1,849,920 1,875,232 1,884,832
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 44,394 44,394 44,394 44,394 44,394
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 58,788 58,788 58,788 58,788 58,788
4.3 COLUMNAS 3500 PSI M3 ### 835,473 806,091 818,002 841,032 849,767
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 259,687 247,031 243,493 256,843 263,059
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI M2 ### 103,426 100,574 101,730 103,966 104,814
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI
M2 ### 122,134 118,711 120,098 122,782 123,799
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 134,459 129,895 131,745 135,323 136,680
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 141,893 137,043 139,009 142,810 144,252
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 162,784 156,794 159,222 163,918 165,699
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 181,146 174,299 177,075 182,441 184,476
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 201,040 193,338 196,461 202,498 204,787
4.12 ENTREPISO VIGUETA PLACA M2 ### 104,388 103,902 104,099 104,480 104,625
4.13 ESCALERA MACIZA 3500 PSI M3 ### 991,425 962,043 973,954 996,984 1,005,718
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 100,674 100,235 100,413 100,757 100,888
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 82,383 79,445 80,636 82,939 83,812
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 92,763 89,168 90,625 93,443 94,511
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ###
i 108,181 103,674 105,501 109,034 110,373
p
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### i 730,611 701,229 713,140 736,170 744,904
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### o 50,709 49,799 50,168 50,882 51,153
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 291,585 278,463 283,783 294,068 297,969
4.21 ACERO FIGURADO 37000 PSI KG ### 4,428 4,428 4,428 4,428 4,428
4.22 ACERO FIGURADO 60000 PSI KG ### 4,644 4,644 4,644 4,644 4,644
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,423 6,423 6,423 6,423 6,423
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 879,264 849,883 861,793 884,823 893,558
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 803,014 770,861 783,895 809,098 818,656
4.26 VIGA AÉREA 3500 PSI M3 ### 874,005 844,624 856,535 879,564 888,299
4.27 VIGA CINTA 3500 PSI M3 ### 853,954 824,573 836,484 859,513 868,248
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,065,079 1,035,697 1,047,608 1,070,638 1,079,372
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 335,457 303,350 316,366 341,532 351,077
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,532 29,731 30,056 30,683 30,921
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 50,994 50,194 50,518 51,145 51,383
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,200 36,007 36,086 36,237 36,294
5.4 ARCOS EN LADRILLO PRENSADO ML ### 169,177 168,791 168,947 169,250 169,365
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,455 44,544 44,914 45,627 45,898
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,229 27,790 27,968 28,312 28,443
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 104,899 104,126 104,440 105,046 105,275
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 95,073 92,037 93,268 95,647 96,550
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,393 95,393 95,393 95,393 95,393
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,620 55,620 55,620 55,620 55,620
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 91,789 91,789 91,789 91,789 91,789
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 53,818 53,818 53,818 53,818 53,818
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 106,982 106,982 106,982 106,982 106,982
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,736 62,736 62,736 62,736 62,736
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 119,213 119,213 119,213 119,213 119,213
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,852 68,852 68,852 68,852 68,852
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,720 42,331 42,489 42,793 42,909
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,674 25,479 25,558 25,710 25,768
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 55,891 55,632 55,737 55,940 56,017
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,325 33,195 33,248 33,349 33,388
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 62,825 62,566 62,671 62,874 62,951
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,465 37,336 37,388 37,490 37,528
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ###
i 104,865 103,571 104,095 105,110 105,495
p
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### i 61,512 60,864 61,127 61,634 61,827
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### o 39,052 38,794 38,898 39,101 39,178
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,507 23,378 23,430 23,532 23,570
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 77,977 77,459 77,669 78,075 78,229
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,650 46,391 46,496 46,699 46,776
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 92,985 92,545 92,724 93,068 93,199
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 55,831 55,611 55,700 55,872 55,938
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 193,036 191,223 191,958 193,379 193,918
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 114,912 114,005 114,373 115,083 115,353
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 94,816 94,010 94,337 94,969 95,208
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,747 56,344 56,507 56,823 56,943
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 49,465 48,885 49,120 49,575 49,747
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,831 29,541 29,659 29,886 29,972
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 35,336 35,077 35,182 35,385 35,462
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,374 21,244 21,297 21,398 21,437
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 53,865 53,347 53,557 53,963 54,117
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,713 32,454 32,559 32,762 32,839
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 103,977 103,200 103,515 104,124 104,355
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,737 62,348 62,506 62,810 62,926
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 75,811 75,293 75,503 75,909 76,063
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,429 45,170 45,275 45,478 45,555
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 160,165 158,352 159,087 160,508 161,047
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 96,533 95,627 95,995 96,705 96,974
5.47 REMATES LADRILLO PRENSADO ML ### 33,182 32,989 33,067 33,219 33,276
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,214 37,634 37,869 38,324 38,496
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,433 63,660 63,973 64,579 64,809
5.50 LAVADA DE FACHADA M2 ### 5,288 5,288 5,288 5,288 5,288
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,365 50,564 50,889 51,516 51,754
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,684 10,684 10,684 10,684 10,684
5.53 ANCLAJE 3/8" L=30CM UN ### 14,223 14,223 14,223 14,223 14,223
5.54 ANCLAJE 1/2" L=50CM UN ### 18,617 18,617 18,617 18,617 18,617
5.55 ANCLAJE 5/8" L=70CM UN ### 26,235 26,235 26,235 26,235 26,235
5.56 ANCLAJE 3/4" L=70CM UN ### 39,354 39,354 39,354 39,354 39,354
5.57 ANCLAJE 1" L= 70CM UN ### 5,080 4,862 4,951 5,122 5,187
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 28,010 27,233 27,548 28,157 28,388
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE) M2 ### 87,265 85,748 86,363 87,553 88,004
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 58,382 58,382 58,382 58,382 58,382
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,078 23,078 23,078 23,078 23,078
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,309 36,309 36,309 36,309 36,309
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 85,469 85,469 85,469 85,469 85,469
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 66,813 66,813 66,813 66,813 66,813
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ###
i 38,640 38,640 38,640 38,640 38,640
p
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### i 89,600 89,600 89,600 89,600 89,600
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### o 107,092 107,092 107,092 107,092 107,092
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 157,631 157,631 157,631 157,631 157,631
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 61,877 61,877 61,877 61,877 61,877
7.13 CANAL PVC AMAZONAS ML ### 85,758 85,758 85,758 85,758 85,758
7.14 CANAL PVC RAINGO ML ### 77,867 77,867 77,867 77,867 77,867
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 139,148 139,148 139,148 139,148 139,148
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 81,392 81,392 81,392 81,392 81,392
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 59,679 59,679 59,679 59,679 59,679
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,564 33,564 33,564 33,564 33,564
7.19 TEJA DE BARRO M2 ### 62,167 61,201 61,593 62,350 62,637
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 49,764 49,764 49,764 49,764 49,764
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 45,594 45,594 45,594 45,594 45,594
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,150 38,150 38,150 38,150 38,150
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 37,381 37,381 37,381 37,381 37,381
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,667 37,667 37,667 37,667 37,667
7.25 TEJA TERMOACÚSTICA M2 ### 53,274 53,274 53,274 53,274 53,274
7.26 TEJA PLÁSTICA No.6 M2 ### 46,776 46,776 46,776 46,776 46,776
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 85,957 85,957 85,957 85,957 85,957
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 159,162 159,162 159,162 159,162 159,162
7.29 TEJA SIN TRASLAPO M2 ### 71,385 71,385 71,385 71,385 71,385
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,005 44,005 44,005 44,005 44,005
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,600 34,600 34,600 34,600 34,600
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO
7.32 4"x2", 15 MM)
M2 ### 60,859 60,859 60,859 60,859 60,859
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,651 20,651 20,651 20,651 20,651
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,952 24,952 24,952 24,952 24,952
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,117 27,117 27,117 27,117 27,117
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,057 35,057 35,057 35,057 35,057
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,011 23,011 23,011 23,011 23,011
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,245 54,245 54,245 54,245 54,245
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 378,104 378,104 378,104 378,104 378,104
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 422,267 422,267 422,267 422,267 422,267
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 285,348 285,348 285,348 285,348 285,348
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 305,454 305,454 305,454 305,454 305,454
8 MORTEROS Y CONCRETOS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
8.1 CONCRETO 4000 PSI M3 ###
i 478,778 447,579 460,226 484,681 493,956
p
8.2 CONCRETO 3500 PSI M3 ### i 417,346 388,820 400,384 422,743 431,223
8.3 CONCRETO 3000 PSI M3 ### o 414,335 385,075 396,937 419,872 428,571
8.4 CONCRETO 2500 PSI M3 ### 369,071 338,716 351,022 374,815 383,839
8.5 CONCRETO 2000 PSI M3 ### 343,361 312,562 325,048 349,189 358,345
8.6 CONCRETO 1500 PSI M3 ### 310,576 279,404 292,041 316,474 325,741
8.7 MORTERO SECO 1:10 M3 ### 268,269 241,600 252,411 273,314 281,242
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 488,967 463,071 473,569 493,866 501,564
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 445,445 418,583 429,472 450,526 458,512
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 509,829 484,706 494,890 514,582 522,050
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 750,169 725,046 735,230 754,922 762,390
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 129,393 129,393 129,393 129,393 129,393
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,257 4,064 4,142 4,294 4,351
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 144,372 144,372 144,372 144,372 144,372
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 177,274 177,274 177,274 177,274 177,274
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 259,493 259,493 259,493 259,493 259,493
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 288,932 288,932 288,932 288,932 288,932
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 318,405 318,405 318,405 318,405 318,405
9.8 HOJA PUERTA FORTEC 0.81 UN ### 211,715 211,715 211,715 211,715 211,715
9.9 HOJA PUERTA FORTEC 0.91 UN ### 240,098 240,098 240,098 240,098 240,098
9.10 HOJA PUERTA FORTEC 1.50 UN ### 353,632 353,632 353,632 353,632 353,632
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 133,661 133,661 133,661 133,661 133,661
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 177,655 177,655 177,655 177,655 177,655
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 197,523 197,523 197,523 197,523 197,523
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 504,063 504,063 504,063 504,063 504,063
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,069 44,069 44,069 44,069 44,069
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,199 27,199 27,199 27,199 27,199
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,146 104,146 104,146 104,146 104,146
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 128,783 128,783 128,783 128,783 128,783
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 99,974 99,974 99,974 99,974 99,974
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,776 30,776 30,776 30,776 30,776
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,776 30,776 30,776 30,776 30,776
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 29,158 29,158 29,158 29,158 29,158
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,507 44,507 44,507 44,507 44,507
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 55,257 55,257 55,257 55,257 55,257
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ###
i 66,724 66,724 66,724 66,724 66,724
p
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### i 80,341 80,341 80,341 80,341 80,341
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### o 380,129 380,129 380,129 380,129 380,129
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 265,460 265,460 265,460 265,460 265,460
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,191 35,191 35,191 35,191 35,191
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,224 45,224 45,224 45,224 45,224
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 55,257 55,257 55,257 55,257 55,257
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 69,591 69,591 69,591 69,591 69,591
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 79,796 79,796 79,796 79,796 79,796
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 223,933 223,933 223,933 223,933 223,933
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 84,182 84,182 84,182 84,182 84,182
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 149,624 149,624 149,624 149,624 149,624
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 142,992 142,992 142,992 142,992 142,992
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 93,857 93,857 93,857 93,857 93,857
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 221,757 221,757 221,757 221,757 221,757
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,193 115,193 115,193 115,193 115,193
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,892 6,892 6,892 6,892 6,892
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL
10.10 GALVANIZADO 2")
M2 ### 102,950 102,950 102,950 102,950 102,950
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 127,237 127,237 127,237 127,237 127,237
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,422 42,422 42,422 42,422 42,422
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 571,802 571,802 571,802 571,802 571,802
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 204,985 204,985 204,985 204,985 204,985
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 228,831 228,831 228,831 228,831 228,831
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS)
M2 ### 520,619 520,619 520,619 520,619 520,619
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 133,277 133,277 133,277 133,277 133,277
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 417,356 417,356 417,356 417,356 417,356
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,304 6,304 6,304 6,304 6,304
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 292,719 292,719 292,719 292,719 292,719
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 127,120 127,120 127,120 127,120 127,120
10.21 REJILLA PISO 0.30 M M2 ### 90,539 90,539 90,539 90,539 90,539
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,278 93,278 93,278 93,278 93,278
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, p
10.23 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ###
i 10,955 10,955 10,955 10,955 10,955
PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
o
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 12,186 12,186 12,186 12,186 12,186
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10.25 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 9,631 9,631 9,631 9,631 9,631
SUMINISTRO Y MONTAJE
11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 229,552 229,552 229,552 229,552 229,552
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 277,979 277,979 277,979 277,979 277,979
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,078 23,078 23,078 23,078 23,078
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 36,309 36,309 36,309 36,309 36,309
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,708 34,708 34,708 34,708 34,708
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,617 44,617 44,617 44,617 44,617
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 92,318 92,318 92,318 92,318 92,318
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 230,995 230,995 230,995 230,995 230,995
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,361 44,361 44,361 44,361 44,361
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 36,354 36,354 36,354 36,354 36,354
11.13 NIPLE PASAMURO 2" UN ### 68,688 68,688 68,688 68,688 68,688
11.14 NIPLE PASAMURO 4" UN ### 102,789 102,789 102,789 102,789 102,789
11.15 PUNTO AGUA CALIENTE CPVC UN ### 87,205 87,205 87,205 87,205 87,205
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 63,023 63,023 63,023 63,023 63,023
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 67,175 67,175 67,175 67,175 67,175
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 84,914 84,914 84,914 84,914 84,914
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 68,820 68,820 68,820 68,820 68,820
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 86,550 86,550 86,550 86,550 86,550
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 92,695 92,695 92,695 92,695 92,695
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 77,331 77,331 77,331 77,331 77,331
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,057 13,057 13,057 13,057 13,057
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,469 18,469 18,469 18,469 18,469
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 24,095 24,095 24,095 24,095 24,095
11.26 RED SUMINISTRO PVC 1" ML ### 14,831 14,831 14,831 14,831 14,831
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
11.27 RED SUMINISTRO PVC 1/2" ML ###
i 8,825 8,825 8,825 8,825 8,825
p
11.28 RED SUMINISTRO PVC 2 1/2" ML ### i 53,884 53,884 53,884 53,884 53,884
11.29 RED SUMINISTRO PVC 2" ML ### o 34,399 34,399 34,399 34,399 34,399
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,075 11,075 11,075 11,075 11,075
11.31 RED SANITARIA PVC-S 2" ML ### 26,492 26,492 26,492 26,492 26,492
11.32 RED SANITARIA PVC-S 3" ML ### 36,820 36,820 36,820 36,820 36,820
11.33 RED SANITARIA PVC-S 4" ML ### 50,012 50,012 50,012 50,012 50,012
11.34 RED SANITARIA PVC-S 6" ML ### 93,943 93,943 93,943 93,943 93,943
11.35 REGISTRO 1" UN ### 113,676 113,676 113,676 113,676 113,676
11.36 REGISTRO 1/2" UN ### 63,301 63,301 63,301 63,301 63,301
11.37 REGISTRO 3/4" UN ### 80,784 80,784 80,784 80,784 80,784
11.38 REGISTRO 1 1/2" UN ### 195,704 195,704 195,704 195,704 195,704
11.39 REGISTRO 2 1/2" UN ### 404,463 404,463 404,463 404,463 404,463
11.40 REGISTRO 2" UN ### 298,474 298,474 298,474 298,474 298,474
11.41 REVENTILACIÓN 2" ML ### 18,422 18,422 18,422 18,422 18,422
11.42 REVENTILACIÓN 3" ML ### 23,268 23,268 23,268 23,268 23,268
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 181,086 181,086 181,086 181,086 181,086
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 295,566 295,566 295,566 295,566 295,566
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 492,453 492,453 492,453 492,453 492,453
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 42,588 42,588 42,588 42,588 42,588
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 50,254 50,254 50,254 50,254 50,254
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 64,146 64,146 64,146 64,146 64,146
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 73,069 73,069 73,069 73,069 73,069
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 94,219 94,219 94,219 94,219 94,219
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 108,454 108,454 108,454 108,454 108,454
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 160,144 160,144 160,144 160,144 160,144
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,309 64,309 64,309 64,309 64,309
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,577 64,577 64,577 64,577 64,577
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,890 41,890 41,890 41,890 41,890
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 51,767 51,767 51,767 51,767 51,767
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,404 4,404 4,404 4,404 4,404
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,960 6,960 6,960 6,960 6,960
11.59 GABINETE TIPO III UN ### 1,072,712 1,072,712 1,072,712 1,072,712 1,072,712
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
11.60 GABINETE TIPO I UN ###
i 817,546 817,546 817,546 817,546 817,546
p
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### i 2,769,353 2,769,353 2,769,353 2,769,353 2,769,353
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### o 2,307,749 2,307,749 2,307,749 2,307,749 2,307,749
11.63 VÁLVULA MARIPOSA 3" UN ### 665,202 665,202 665,202 665,202 665,202
11.64 VÁLVULA MARIPOSA 4" UN ### 862,750 862,750 862,750 862,750 862,750
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 334,183 334,183 334,183 334,183 334,183
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 383,695 383,695 383,695 383,695 383,695
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 60,977 60,977 60,977 60,977 60,977
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 72,276 72,276 72,276 72,276 72,276
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 80,136 80,136 80,136 80,136 80,136
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 94,501 94,501 94,501 94,501 94,501
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 57,273 57,273 57,273 57,273 57,273
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 65,326 65,326 65,326 65,326 65,326
12.8 STRIP TELEFÓNICO 10 PARES UN ### 150,220 150,220 150,220 150,220 150,220
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 58,848 58,848 58,848 58,848 58,848
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 135,369 135,369 135,369 135,369 135,369
12.11 SALIDA T.V PVC COMPLETA. UN ### 80,850 80,850 80,850 80,850 80,850
12.12 SALIDA BIFÁSICA C.N. UN ### 47,958 47,958 47,958 47,958 47,958
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 100,817 100,817 100,817 100,817 100,817
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 430,198 430,198 430,198 430,198 430,198
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 573,588 573,588 573,588 573,588 573,588
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,715 3,715 3,715 3,715 3,715
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,903 4,903 4,903 4,903 4,903
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,640 7,640 7,640 7,640 7,640
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,656 13,656 13,656 13,656 13,656
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 287,227 287,227 287,227 287,227 287,227
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 80,957 80,957 80,957 80,957 80,957
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 109,934 109,934 109,934 109,934 109,934
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,297 44,297 44,297 44,297 44,297
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,467,548 1,467,548 1,467,548 1,467,548 1,467,548
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,087,260 1,087,260 1,087,260 1,087,260 1,087,260
12.26 POSTE METÁLICO 6M UN ### 1,369,689 1,369,689 1,369,689 1,369,689 1,369,689
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 639,098 639,098 639,098 639,098 639,098
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 115,946 115,946 115,946 115,946 115,946
12.29 LUMINARIA 70W SODIO UN ### 536,426 536,426 536,426 536,426 536,426
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
12.30 LUMINARIA 150W SODIO UN ###
i 671,426 671,426 671,426 671,426 671,426
p
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### i 1,775,377 1,775,377 1,775,377 1,775,377 1,775,377
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### o 1,307,053 1,307,053 1,307,053 1,307,053 1,307,053
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,773 40,807 41,198 41,956 42,243
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,771 40,805 41,197 41,954 42,241
13.3 ALISTADO PARA LISTÓN M2 ### 15,223 15,030 15,108 15,259 15,317
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 30,003 28,070 28,854 30,368 30,943
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 90,534 88,601 89,385 90,899 91,474
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,230 26,614 26,864 27,347 27,530
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 59,797 56,761 57,992 60,371 61,273
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 83,243 78,387 80,356 84,163 85,606
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,970 31,970 31,970 31,970 31,970
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,906 23,906 23,906 23,906 23,906
13.11 PERMA PLY 2 CAPAS M2 ### 27,970 27,970 27,970 27,970 27,970
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 48,756 46,024 47,131 49,273 50,085
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 57,179 53,840 55,193 57,811 58,803
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 83,064 77,903 79,995 84,040 85,574
13.15 TRITURADO FINO 1/2 M3 ### 98,621 77,833 86,260 102,555 108,735
13.16 TRITURADO GRUESO 3/4 M3 ### 108,544 83,619 90,819 105,935 110,021
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 60,215 59,829 59,986 60,288 60,403
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,781 35,588 35,666 35,818 35,875
14.3 ADOQUÍN CONCRETO 6CM M2 ### 68,936 67,970 68,362 69,119 69,406
14.4 ADOQUÍN CONCRETO 8CM M2 ### 72,486 71,520 71,912 72,669 72,956
14.5 ADOQUÍN GRES PEATONAL M2 ### 76,999 76,033 76,425 77,182 77,469
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE
14.6 ALISTADO
M2 ### 79,742 79,355 79,512 79,815 79,930
14.7 GRAVILLA PARA GRADAS ML ### 37,895 37,500 37,660 37,970 38,087
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 174,137 172,398 173,103 174,466 174,983
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 47,633 46,649 47,048 47,819 48,111
14.10 GUARDAESCOBA EN GRANITO ML ### 45,384 45,384 45,384 45,384 45,384
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,447 10,052 10,212 10,522 10,640
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,978 9,978 9,978 9,978 9,978
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,416 13,416 13,416 13,416 13,416
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,021 11,021 11,021 11,021 11,021
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
14.15 GUARDAESCOBA CEDRO BLANCO ML ###
i 18,620 18,620 18,620 18,620 18,620
p
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### i 36,501 36,501 36,501 36,501 36,501
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### o 9,469 9,469 9,469 9,469 9,469
14.18 LISTÓN M.H. AMARILLO M2 ### 78,152 78,152 78,152 78,152 78,152
14.19 PASO ESCALERA GRANITO ML ### 124,557 123,204 123,753 124,813 125,215
14.20 PIRLANES ALUMINIO ML ### 7,694 7,694 7,694 7,694 7,694
14.21 PIRLANES LADRILLO ML ### 33,432 33,046 33,203 33,505 33,620
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,602 48,602 48,602 48,602 48,602
14.23 PISO VINILO TRÁFICO PESADO M2 ### 56,594 56,594 56,594 56,594 56,594
14.24 PULIDA LACADA PISO MADERA M2 ### 51,455 51,455 51,455 51,455 51,455
14.25 TABLETA DE GRES 25X25 M2 ### 52,174 51,788 51,944 52,247 52,362
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,664 58,278 58,434 58,737 58,852
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,317 11,317 11,317 11,317 11,317
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 52,382 51,802 52,037 52,492 52,664
14.29 JABONERA PORCELANA ACUARIO UN ### 21,797 21,797 21,797 21,797 21,797
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA
14.30 SIMPLE) UN ### 130,877 130,877 130,877 130,877 130,877
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,276 10,276 10,276 10,276 10,276
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,732 23,732 23,732 23,732 23,732
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,102 15,102 15,102 15,102 15,102
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,662 14,662 14,662 14,662 14,662
14.35 REMATES BOCEL ALUMINIO ML ### 8,796 8,796 8,796 8,796 8,796
14.36 REMATES BOCEL PORCELANA ML ### 8,957 8,957 8,957 8,957 8,957
14.37 TAPA REGISTRO 20X20 UN ### 20,053 20,053 20,053 20,053 20,053
14.38 TAPA REGISTRO 6X6 UN ### 18,244 18,244 18,244 18,244 18,244
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,010 20,010 20,010 20,010 20,010
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 23,132 23,132 23,132 23,132 23,132
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 69,189 68,802 68,959 69,262 69,377
14.42 MEDIA CAÑA EN GRANITO ML ### 82,604 82,604 82,604 82,604 82,604
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,855 34,855 34,855 34,855 34,855
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,926 13,926 13,926 13,926 13,926
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 108,880 108,880 108,880 108,880 108,880
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 131,449 131,449 131,449 131,449 131,449
15 CIELO RASO
15.1 APLIQUE YESO ML ### 77,560 77,560 77,560 77,560 77,560
15.2 ARMADURA MADERA Y MALLA M2 ### 37,092 37,092 37,092 37,092 37,092
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ###
i 58,158 58,158 58,158 58,158 58,158
p
15.4 CIELO RASO DURACUSTIC M2 ### i 71,627 71,627 71,627 71,627 71,627
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### o 53,359 53,359 53,359 53,359 53,359
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,425 99,425 99,425 99,425 99,425
15.7 CORNISAS YESO ML ### 52,130 52,130 52,130 52,130 52,130
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 110,149 110,149 110,149 110,149 110,149
15.9 MALLA CON VENA M2 ### 13,895 13,895 13,895 13,895 13,895
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
16.2 UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 105,381 74,540 74,540 79,680 74,540
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 105,043 82,841 91,842 109,244 115,844
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 173,419 142,578 146,005 180,273 185,413
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 95,287 64,446 64,446 69,586 64,446
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 137,350 106,509 109,936 144,204 149,344
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 170,388 139,547 142,974 177,242 182,382
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 321,098 321,098 321,098 321,098 321,098
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 950,525 950,525 950,525 950,525 950,525
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 514,164 514,164 514,164 514,164 514,164
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 147,279 147,279 147,279 147,279 147,279
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 207,423 207,423 207,423 207,423 207,423
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 192,479 192,479 192,479 192,479 192,479
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 426,318 426,318 426,318 426,318 426,318
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,093,493 1,093,493 1,093,493 1,093,493 1,093,493
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 309,095 309,095 309,095 309,095 309,095
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 218,095 218,095 218,095 218,095 218,095
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO,n INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ###
i 85,576 85,576 85,576 85,576 85,576
p
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 i
17.12 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 264,817 264,817 264,817 264,817 264,817
o
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120
17.13 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 391,122 391,122 391,122 391,122 391,122
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,655 8,655 8,655 8,655 8,655
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,226 3,226 3,226 3,226 3,226
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,436 11,436 11,436 11,436 11,436
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,054 44,054 44,054 44,054 44,054
18.5 CARBURO SOBRE PAÑETES M2 ### 6,000 6,000 6,000 6,000 6,000
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 69,999 69,999 69,999 69,999 69,999
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,555 3,555 3,555 3,555 3,555
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,887 2,887 2,887 2,887 2,887
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,424 14,424 14,424 14,424 14,424
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,191 4,191 4,191 4,191 4,191
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,216 15,216 15,216 15,216 15,216
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,040 6,040 6,040 6,040 6,040
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,854 6,854 6,854 6,854 6,854
18.14 ESTUCO M2 ### 7,190 7,190 7,190 7,190 7,190
18.15 ESTUCO (LINEAL) ML ### 4,490 4,490 4,490 4,490 4,490
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,029 16,029 16,029 16,029 16,029
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,894 9,894 9,894 9,894 9,894
18.18 LACA PISOS MADERA M2 ### 23,333 23,333 23,333 23,333 23,333
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,768 2,768 2,768 2,768 2,768
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,771 12,771 12,771 12,771 12,771
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,439 3,439 3,439 3,439 3,439
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,052 13,052 13,052 13,052 13,052
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,324 7,324 7,324 7,324 7,324
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,583 4,583 4,583 4,583 4,583
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,825 22,825 22,825 22,825 22,825
18.26 PINTURA EPÓXICA M2 ### 13,057 13,057 13,057 13,057 13,057
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,038 8,038 8,038 8,038 8,038
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,486,425 6,486,425 6,486,425 6,486,425 6,486,425
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO
19.2 PARA MOVILIZAR (PAR)
UN ### p11,460,448 11,460,448 11,460,448 11,460,448 11,460,448
i
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### o 2,998,962 2,998,962 2,998,962 2,998,962 2,998,962
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,801,399 9,801,399 9,801,399 9,801,399 9,801,399
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,180,060 9,180,060 9,180,060 9,180,060 9,180,060
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,768 2,768 2,768 2,768 2,768
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 919,032 919,032 919,032 919,032 919,032
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 92,024 92,024 92,024 92,024 92,024
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,665,309 1,664,997 1,665,124 1,665,368 1,665,461
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 714,612 707,297 710,263 715,996 718,171
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 121,759 121,759 121,759 121,759 121,759
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,271,333 1,271,333 1,271,333 1,271,333 1,271,333
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 159,182 159,182 159,182 159,182 159,182
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,472,571 1,472,571 1,472,571 1,472,571 1,472,571
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,026,219 1,026,219 1,026,219 1,026,219 1,026,219
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,470 63,470 63,470 63,470 63,470
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 120,867 120,867 120,867 120,867 120,867
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 285,616 285,616 285,616 285,616 285,616
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 285,609 285,609 285,609 285,609 285,609
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 458,634 458,634 458,634 458,634 458,634
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 120,918 120,918 120,918 120,918 120,918
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 120,918 120,918 120,918 120,918 120,918
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 285,616 285,616 285,616 285,616 285,616
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 285,616 285,616 285,616 285,616 285,616
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 458,634 458,634 458,634 458,634 458,634
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 458,925 458,925 458,925 458,925 458,925
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 746,390 746,390 746,390 746,390 746,390
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,198,357 1,198,357 1,198,357 1,198,357 1,198,357
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 74,010 74,010 74,010 74,010 74,010
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 383,709 383,709 383,709 383,709 383,709
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 431,713 431,713 431,713 431,713 431,713
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,194,195 1,194,195 1,194,195 1,194,195 1,194,195
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 69,856 69,597 69,702 69,905 69,982
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 347,665 347,665 347,665 347,665 347,665
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 53,009 53,009 53,009 53,009 53,009
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 75,048 75,048 75,048 75,048 75,048
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 108,386 108,386 108,386 108,386 108,386
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 166,415 166,415 166,415 166,415 166,415
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 267,618 267,618 267,618 267,618 267,618
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 387,456 387,456 387,456 387,456 387,456
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 490,576 490,576 490,576 490,576 490,576
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 645,125 645,125 645,125 645,125 645,125
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 887,990 887,990 887,990 887,990 887,990
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 77,189 75,837 76,385 77,445 77,847
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 91,541 90,189 90,737 91,797 92,199
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 57,964 54,777 56,069 58,567 59,515
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 62,717 59,644 60,890 63,298 64,212
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 63,033 60,038 61,252 63,600 64,490
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
5.6 BORDE SEPARADOR VERDE A-170 ML ###
i 268,673 268,170 268,374 268,768 268,917
p
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### i 18,747 18,364 18,519 18,819 18,933
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### o 41,408 39,161 40,072 41,833 42,500
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 87,425 87,156 87,265 87,476 87,556
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 577,887 571,181 573,899 579,156 581,149
5.11 LOSETA PREFABRICADA A-40 M2 ### 65,375 64,226 64,692 65,593 65,935
5.12 LOSETA PREFABRICADA A-60 M2 ### 95,585 94,435 94,902 95,803 96,145
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 34,366 33,137 33,635 34,598 34,964
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 55,451 52,964 53,972 55,921 56,661
5.15 SARDINEL PREFABRICADO A-10 ML ### 106,748 102,898 103,404 107,595 108,272
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 62,976 62,281 62,563 63,108 63,315
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 213,176 211,713 212,306 213,453 213,888
6.2 BANCA EN CONCRETO M-30 UN ### 703,598 701,550 702,380 703,986 704,595
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 225,544 225,236 225,361 225,602 225,694
6.4 BOLARDO M-60 CONCRETO UN ### 169,219 167,463 168,175 169,551 170,073
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 171,087 169,331 170,043 171,419 171,941
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 201,177 199,330 200,079 201,527 202,077
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 61,236 60,200 60,620 61,432 61,740
6.8 BORDILLO PREFABRICADO A-80 ML ### 71,961 70,802 71,272 72,180 72,525
6.9 CANECA M-120 UN ### 329,520 329,261 329,366 329,569 329,646
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 867,990 867,112 867,468 868,156 868,417
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,572,612 3,572,027 3,572,264 3,572,723 3,572,897
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,675,337 3,674,752 3,674,989 3,675,448 3,675,622
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 513,257 512,641 512,891 513,374 513,557
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 679,718 677,254 678,253 680,184 680,917
6.15 BANCA EN MADERA M-50 UN ### 564,365 564,365 564,365 564,365 564,365
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 259,621 258,743 259,099 259,787 260,048
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 608,488 607,840 608,103 608,610 608,803
6.18 POSTE HISTÓRICO M-131 UN ### 6,791,256 6,786,867 6,788,646 6,792,086 6,793,391
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,267 4,267 4,267 4,267 4,267
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,357 45,357 45,357 45,357 45,357
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 330,526 330,275 330,377 330,574 330,649
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 519,517 518,285 518,785 519,750 520,117
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ###
i 245,306 245,054 245,156 245,353 245,428
p
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### i 260,718 260,466 260,568 260,765 260,840
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### o 272,389 272,137 272,239 272,436 272,511
7.8 TACHAS REFLECTIVAS UN ### 14,228 14,228 14,228 14,228 14,228
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,204 15,204 15,204 15,204 15,204
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 124,257 124,257 124,257 124,257 124,257
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
VÍAS (SEGÚN ESPECIFICACIONES p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.1 201 P UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.2 201 P DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.3 200.1 DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.5 201.7 DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES M3-KM### 1,318 1,318 1,318 1,318 1,318
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
U DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2
o
UN ### 2,103,026 2,082,218 2,083,759 2,089,924 2,087,612
1.2 CAMPAMENTO 9 M2 UN ### 1,222,103 1,211,699 1,212,469 1,215,552 1,214,396
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,583 14,583 14,583 14,583 14,583
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,353 16,353 16,353 16,353 16,353
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,889 18,889 18,889 18,889 18,889
1.6 CERCA EN TABLA H=2.30 M ML ### 69,185 69,185 69,185 69,185 69,185
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 48,618 48,394 48,411 48,477 48,452
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,444 22,221 22,237 22,304 22,279
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 9,803 9,803 9,803 9,803 9,803
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
1.37 DESMONTE MUROS SECOS M2 ###
i 15,459 15,459 15,459 15,459 15,459
p
1.38 DESMONTE MARCOS Y PUERTAS UN ### i 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### o 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 955,630 951,902 952,664 952,133 953,974
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 10,921 10,921 10,921 10,921 10,921
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,955 3,955 3,955 3,955 3,955
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,842,418 2,842,418 2,842,418 2,842,418 2,842,418
1.44 RED TELEFÓNICA PROVISIONAL UN ### 261,524 261,524 261,524 261,524 261,524
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 123,162 85,540 95,821 87,181 123,162
2.2 BASE ARENA CEMENTO 1:20 M3 ### 222,776 202,026 203,562 209,711 207,405
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 23,336 23,336 23,336 23,336 23,336
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 675,040 653,016 654,647 661,174 658,725
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 676,310 653,592 655,274 662,007 659,481
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 628,953 607,681 609,255 615,560 613,195
2.9 PILOTE DE MADERA D=20 CM ML ### 50,284 50,284 50,284 50,284 50,284
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM) ML ### 155,175 155,175 155,175 155,175 155,175
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 DISTANCIA MENOR DE 5 KM) ML ### 195,465 195,465 195,465 195,465 195,465
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 DISTANCIA MENOR DE 5 KM)
ML ### 244,188 244,188 244,188 244,188 244,188
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 DISTANCIA MENOR DE 5 KM) ML ### 309,776 309,776 309,776 309,776 309,776
2.14 PILOTE HINCADO 25X25 ML ### 108,407 106,869 106,983 107,439 107,268
2.15 PILOTE HINCADO 30X30 ML ### 134,534 132,304 132,469 133,130 132,882
2.16 DADOS EN CONCRETO 3500PSI M3 ### 614,804 593,531 595,106 601,411 599,046
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 92,966 92,966 92,966 92,966 92,966
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 44,438 44,438 44,438 44,438 44,438
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 58,849 58,849 58,849 58,849 58,849
4.3 COLUMNAS 3500 PSI M3 ### 841,459 820,187 821,762 828,066 825,702
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 263,167 249,614 251,036 254,216 261,904
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI M2 ### 104,046 101,980 102,133 102,745 102,516
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 122,878 120,399 120,583 121,317 121,042
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 135,396 132,091 132,336 133,315 132,948
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 142,887 139,376 139,636 140,677 140,287
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 164,009 159,672 159,993 161,278 160,796
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 182,543 177,587 177,953 179,423 178,871
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 202,611 197,035 197,447 199,100 198,480
4.12 ENTREPISO VIGUETA PLACA M2 ### 104,579 104,225 104,251 104,356 104,317
4.13 ESCALERA MACIZA 3500 PSI M3 ### 997,548 976,276 977,850 984,155 981,790
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 100,658 100,378 100,399 100,482 100,451
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ###
i 82,983 80,855 81,013 81,643 81,407
p
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### i 93,493 90,890 91,083 91,854 91,565
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### o 109,093 105,829 106,071 107,038 106,675
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 736,513 715,240 716,815 723,120 720,755
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 50,855 50,204 50,252 50,445 50,373
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 294,205 284,705 285,408 288,224 287,167
4.21 ACERO FIGURADO 37000 PSI KG ### 4,433 4,433 4,433 4,433 4,433
4.22 ACERO FIGURADO 60000 PSI KG ### 4,649 4,649 4,649 4,649 4,649
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,427 6,427 6,427 6,427 6,427
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 885,200 863,927 865,502 871,806 869,442
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 809,479 786,193 787,917 794,818 792,230
4.26 VIGA AÉREA 3500 PSI M3 ### 879,957 858,684 860,259 866,564 864,199
4.27 VIGA CINTA 3500 PSI M3 ### 859,906 838,634 840,209 846,513 844,148
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,071,043 1,049,771 1,051,346 1,057,650 1,055,285
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 344,683 320,869 322,633 329,689 327,043
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,601 30,039 30,080 30,247 30,185
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 51,065 50,502 50,544 50,711 50,648
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,205 36,076 36,086 36,124 36,110
5.4 ARCOS EN LADRILLO PRENSADO ML ### 169,230 168,972 168,991 169,068 169,039
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,599 44,949 44,997 45,190 45,117
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,122 27,842 27,863 27,946 27,915
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 104,917 104,402 104,440 104,593 104,535
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 95,552 93,383 93,544 94,186 93,945
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,463 95,463 95,463 95,463 95,463
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,655 55,655 55,655 55,655 55,655
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 91,854 91,854 91,854 91,854 91,854
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 53,851 53,851 53,851 53,851 53,851
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 107,071 107,071 107,071 107,071 107,071
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,780 62,780 62,780 62,780 62,780
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 119,314 119,314 119,314 119,314 119,314
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,902 68,902 68,902 68,902 68,902
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,704 42,445 42,465 42,541 42,513
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,666 25,536 25,546 25,584 25,570
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 55,916 55,744 55,757 55,808 55,789
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,338 33,251 33,258 33,283 33,274
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ###
i 62,851 62,678 62,691 62,742 62,723
p
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### i 37,478 37,392 37,398 37,424 37,414
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### o 104,798 103,935 103,999 104,255 104,159
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 61,478 61,047 61,078 61,206 61,158
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 39,051 38,878 38,891 38,942 38,923
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,506 23,420 23,426 23,452 23,442
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 77,976 77,631 77,657 77,759 77,721
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,649 46,477 46,489 46,541 46,521
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 92,955 92,675 92,696 92,779 92,748
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 55,816 55,676 55,686 55,728 55,712
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 193,086 191,877 191,966 192,325 192,190
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 114,937 114,332 114,377 114,556 114,489
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 95,098 94,514 94,557 94,730 94,665
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,888 56,595 56,617 56,704 56,671
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 49,403 49,016 49,045 49,159 49,116
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,800 29,607 29,621 29,678 29,657
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 35,339 35,166 35,179 35,230 35,211
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,375 21,289 21,295 21,321 21,311
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 53,866 53,520 53,546 53,648 53,610
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,714 32,541 32,554 32,605 32,586
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 104,014 103,496 103,534 103,687 103,630
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,755 62,496 62,515 62,592 62,563
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 75,815 75,470 75,495 75,598 75,559
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,431 45,259 45,272 45,323 45,304
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 160,092 158,883 158,972 159,331 159,196
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 96,498 95,893 95,938 96,117 96,050
5.47 REMATES LADRILLO PRENSADO ML ### 33,194 33,065 33,074 33,112 33,098
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,344 37,923 37,955 38,079 38,032
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,609 64,049 64,091 64,257 64,194
5.50 LAVADA DE FACHADA M2 ### 5,289 5,289 5,289 5,289 5,289
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,436 50,874 50,915 51,082 51,019
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,686 10,686 10,686 10,686 10,686
5.53 ANCLAJE 3/8" L=30CM UN ### 14,227 14,227 14,227 14,227 14,227
5.54 ANCLAJE 1/2" L=50CM UN ### 18,624 18,624 18,624 18,624 18,624
5.55 ANCLAJE 5/8" L=70CM UN ### 26,249 26,249 26,249 26,249 26,249
5.56 ANCLAJE 3/4" L=70CM UN ### 39,380 39,380 39,380 39,380 39,380
5.57 ANCLAJE 1" L= 70CM UN ### 5,131 4,972 4,984 5,031 5,013
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
p
6 PAÑETES, REVOQUES Y REPELLOS i
6.1 ENTRAMADO MADERA CIELO RASO M2 ### o 16,381 16,381 16,381 16,381 16,381
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,951 5,822 5,832 5,870 5,856
6.3 FILOS O DILATACIONES S/MURO ML ### 7,137 7,008 7,018 7,056 7,041
6.4 GOTERA EN MORTERO 1:4 ML ### 8,480 8,352 8,361 8,399 8,385
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,147 7,147 7,147 7,147 7,147
6.6 MALLA BAJO ENTRAMADO M2 ### 14,002 14,002 14,002 14,002 14,002
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,033 24,624 24,655 24,776 24,730
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,111 14,906 14,921 14,982 14,959
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,884 21,522 21,549 21,656 21,616
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,226 13,045 13,058 13,112 13,092
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,142 20,733 20,763 20,885 20,839
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,855 12,650 12,666 12,726 12,703
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,884 21,522 21,549 21,656 21,616
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,226 13,045 13,058 13,112 13,092
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,467 22,176 22,197 22,284 22,251
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,516 13,371 13,381 13,425 13,408
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,156 17,880 17,900 17,982 17,951
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,073 10,935 10,946 10,986 10,971
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,591 17,279 17,302 17,394 17,360
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,791 10,635 10,646 10,693 10,675
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,663 22,300 22,327 22,434 22,394
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,595 13,414 13,427 13,481 13,461
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,920 21,511 21,542 21,663 21,617
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,224 13,020 13,035 13,095 13,073
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,201 17,889 17,912 18,005 17,970
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,078 10,922 10,934 10,980 10,963
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,810 22,401 22,431 22,552 22,507
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,073 13,869 13,884 13,944 13,922
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 27,928 27,410 27,448 27,602 27,544
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7.2 TELA IMPERMEABLE) M2 ### 87,542 86,457 86,538 86,859 86,738
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 58,438 58,438 58,438 58,438 58,438
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,095 23,095 23,095 23,095 23,095
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ###
p 36,337 36,337 36,337 36,337 36,337
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### i 85,553 85,553 85,553 85,553 85,553
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### o 66,876 66,876 66,876 66,876 66,876
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,669 38,669 38,669 38,669 38,669
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 89,689 89,689 89,689 89,689 89,689
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 107,200 107,200 107,200 107,200 107,200
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 157,796 157,796 157,796 157,796 157,796
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 61,930 61,930 61,930 61,930 61,930
7.13 CANAL PVC AMAZONAS ML ### 85,827 85,827 85,827 85,827 85,827
7.14 CANAL PVC RAINGO ML ### 77,931 77,931 77,931 77,931 77,931
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 139,282 139,282 139,282 139,282 139,282
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 81,474 81,474 81,474 81,474 81,474
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 59,736 59,736 59,736 59,736 59,736
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,585 33,585 33,585 33,585 33,585
7.19 TEJA DE BARRO M2 ### 62,093 61,449 61,496 61,687 61,616
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 49,811 49,811 49,811 49,811 49,811
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 45,636 45,636 45,636 45,636 45,636
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,179 38,179 38,179 38,179 38,179
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 37,410 37,410 37,410 37,410 37,410
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,696 37,696 37,696 37,696 37,696
7.25 TEJA TERMOACÚSTICA M2 ### 53,322 53,322 53,322 53,322 53,322
7.26 TEJA PLÁSTICA No.6 M2 ### 46,816 46,816 46,816 46,816 46,816
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 86,040 86,040 86,040 86,040 86,040
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 159,326 159,326 159,326 159,326 159,326
7.29 TEJA SIN TRASLAPO M2 ### 71,455 71,455 71,455 71,455 71,455
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,028 44,028 44,028 44,028 44,028
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,622 34,622 34,622 34,622 34,622
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM) M2 ### 60,909 60,909 60,909 60,909 60,909
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,661 20,661 20,661 20,661 20,661
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,967 24,967 24,967 24,967 24,967
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,136 27,136 27,136 27,136 27,136
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,085 35,085 35,085 35,085 35,085
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,025 23,025 23,025 23,025 23,025
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,281 54,281 54,281 54,281 54,281
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 378,516 378,516 378,516 378,516 378,516
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 422,485 422,485 422,485 422,485 422,485
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ###
i 285,616 285,616 285,616 285,616 285,616
p
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### i 305,735 305,735 305,735 305,735 305,735
o
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 483,432 461,139 462,790 469,396 466,919
8.2 CONCRETO 3500 PSI M3 ### 423,022 402,369 403,898 410,019 407,723
8.3 CONCRETO 3000 PSI M3 ### 421,173 399,791 401,374 407,711 405,334
8.4 CONCRETO 2500 PSI M3 ### 373,458 351,768 353,374 359,802 357,391
8.5 CONCRETO 2000 PSI M3 ### 349,679 327,316 328,972 335,599 333,114
8.6 CONCRETO 1500 PSI M3 ### 319,533 296,413 298,125 304,976 302,407
8.7 MORTERO SECO 1:10 M3 ### 265,215 247,429 248,746 254,016 252,040
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 486,251 468,981 470,260 475,377 473,458
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 450,907 431,434 432,877 438,647 436,483
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 515,064 496,852 498,202 503,598 501,574
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 755,684 737,472 738,822 744,218 742,194
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 129,504 129,504 129,504 129,504 129,504
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,236 4,107 4,116 4,155 4,140
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 144,485 144,485 144,485 144,485 144,485
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 177,424 177,424 177,424 177,424 177,424
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 259,756 259,756 259,756 259,756 259,756
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 289,229 289,229 289,229 289,229 289,229
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 318,734 318,734 318,734 318,734 318,734
9.8 HOJA PUERTA FORTEC 0.81 UN ### 211,940 211,940 211,940 211,940 211,940
9.9 HOJA PUERTA FORTEC 0.91 UN ### 240,356 240,356 240,356 240,356 240,356
9.10 HOJA PUERTA FORTEC 1.50 UN ### 354,018 354,018 354,018 354,018 354,018
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 133,798 133,798 133,798 133,798 133,798
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 177,842 177,842 177,842 177,842 177,842
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 197,733 197,733 197,733 197,733 197,733
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 504,620 504,620 504,620 504,620 504,620
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,103 44,103 44,103 44,103 44,103
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,214 27,214 27,214 27,214 27,214
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,225 104,225 104,225 104,225 104,225
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 128,922 128,922 128,922 128,922 128,922
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 100,080 100,080 100,080 100,080 100,080
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,803 30,803 30,803 30,803 30,803
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ###
i 30,803 30,803 30,803 30,803 30,803
p
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### i 29,183 29,183 29,183 29,183 29,183
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### o 44,543 44,543 44,543 44,543 44,543
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 55,306 55,306 55,306 55,306 55,306
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 66,786 66,786 66,786 66,786 66,786
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 80,419 80,419 80,419 80,419 80,419
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 380,535 380,535 380,535 380,535 380,535
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 265,737 265,737 265,737 265,737 265,737
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,216 35,216 35,216 35,216 35,216
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,261 45,261 45,261 45,261 45,261
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 55,306 55,306 55,306 55,306 55,306
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 69,656 69,656 69,656 69,656 69,656
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 79,862 79,862 79,862 79,862 79,862
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 224,162 224,162 224,162 224,162 224,162
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 84,243 84,243 84,243 84,243 84,243
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 149,707 149,707 149,707 149,707 149,707
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 143,103 143,103 143,103 143,103 143,103
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 93,930 93,930 93,930 93,930 93,930
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 221,941 221,941 221,941 221,941 221,941
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,279 115,279 115,279 115,279 115,279
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,897 6,897 6,897 6,897 6,897
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2")
M2 ### 103,002 103,002 103,002 103,002 103,002
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00
10,10(1) MTS M2 ### 127,347 127,347 127,347 127,347 127,347
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,443 42,443 42,443 42,443 42,443
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 572,404 572,404 572,404 572,404 572,404
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 205,185 205,185 205,185 205,185 205,185
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 229,025 229,025 229,025 229,025 229,025
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS) M2 ### 521,150 521,150 521,150 521,150 521,150
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 133,357 133,357 133,357 133,357 133,357
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 417,804 417,804 417,804 417,804 417,804
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,309 6,309 6,309 6,309 6,309
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ###
i 293,014 293,014 293,014 293,014 293,014
p
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### i 127,199 127,199 127,199 127,199 127,199
10.21 REJILLA PISO 0.30 M M2 ### o 90,613 90,613 90,613 90,613 90,613
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,353 93,353 93,353 93,353 93,353
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,961 10,961 10,961 10,961 10,961
SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
KG ### 12,193 12,193 12,193 12,193 12,193
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,635 9,635 9,635 9,635 9,635
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 181,230 181,230 181,230 181,230 181,230
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 295,820 295,820 295,820 295,820 295,820
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 492,889 492,889 492,889 492,889 492,889
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 384,061 384,061 384,061 384,061 384,061
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 61,033 61,033 61,033 61,033 61,033
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 72,344 72,344 72,344 72,344 72,344
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 80,208 80,208 80,208 80,208 80,208
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 94,589 94,589 94,589 94,589 94,589
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 57,327 57,327 57,327 57,327 57,327
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 65,392 65,392 65,392 65,392 65,392
12.8 STRIP TELEFÓNICO 10 PARES UN ### 150,338 150,338 150,338 150,338 150,338
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 58,902 58,902 58,902 58,902 58,902
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 135,502 135,502 135,502 135,502 135,502
12.11 SALIDA T.V PVC COMPLETA. UN ### 80,927 80,927 80,927 80,927 80,927
12.12 SALIDA BIFÁSICA C.N. UN ### 48,002 48,002 48,002 48,002 48,002
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 100,906 100,906 100,906 100,906 100,906
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ###
i 430,570 430,570 430,570 430,570 430,570
p
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### i 574,098 574,098 574,098 574,098 574,098
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### o 3,719 3,719 3,719 3,719 3,719
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,908 4,908 4,908 4,908 4,908
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,647 7,647 7,647 7,647 7,647
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,668 13,668 13,668 13,668 13,668
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 287,490 287,490 287,490 287,490 287,490
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 81,027 81,027 81,027 81,027 81,027
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 110,036 110,036 110,036 110,036 110,036
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,326 44,326 44,326 44,326 44,326
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,468,779 1,468,779 1,468,779 1,468,779 1,468,779
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,088,165 1,088,165 1,088,165 1,088,165 1,088,165
12.26 POSTE METÁLICO 6M UN ### 1,371,066 1,371,066 1,371,066 1,371,066 1,371,066
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 639,782 639,782 639,782 639,782 639,782
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 116,053 116,053 116,053 116,053 116,053
12.29 LUMINARIA 70W SODIO UN ### 537,005 537,005 537,005 537,005 537,005
12.30 LUMINARIA 150W SODIO UN ### 672,157 672,157 672,157 672,157 672,157
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,777,357 1,777,357 1,777,357 1,777,357 1,777,357
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,308,501 1,308,501 1,308,501 1,308,501 1,308,501
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,983 41,282 41,334 41,542 41,464
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,991 41,290 41,342 41,550 41,472
13.3 ALISTADO PARA LISTÓN M2 ### 15,266 15,126 15,136 15,178 15,162
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 30,390 28,989 29,093 29,508 29,352
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 90,988 89,587 89,691 90,106 89,950
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,358 26,911 26,944 27,077 27,027
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 60,238 58,069 58,230 58,873 58,632
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 83,950 80,480 80,737 81,766 81,380
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,997 31,997 31,997 31,997 31,997
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,920 23,920 23,920 23,920 23,920
13.11 PERMA PLY 2 CAPAS M2 ### 27,985 27,985 27,985 27,985 27,985
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 49,152 47,200 47,345 47,923 47,706
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 57,663 55,277 55,454 56,161 55,895
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 83,812 80,125 80,398 81,491 81,081
13.15 TRITURADO FINO 1/2 M3 ### 110,795 94,196 95,424 100,344 98,499
13.16 TRITURADO GRUESO 3/4 M3 ### 118,746 98,594 102,032 101,459 108,241
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
p
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS i
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### o 60,335 60,055 60,075 60,158 60,127
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,841 35,701 35,711 35,753 35,737
14.3 ADOQUÍN CONCRETO 6CM M2 ### 69,170 68,470 68,522 68,729 68,651
14.4 ADOQUÍN CONCRETO 8CM M2 ### 72,720 72,020 72,072 72,279 72,201
14.5 ADOQUÍN GRES PEATONAL M2 ### 77,239 76,538 76,590 76,798 76,720
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO M2 ### 79,884 79,604 79,625 79,708 79,677
14.7 GRAVILLA PARA GRADAS ML ### 38,069 37,765 37,787 37,877 37,844
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 174,627 173,367 173,460 173,834 173,694
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 48,019 47,271 47,326 47,548 47,465
14.10 GUARDAESCOBA EN GRANITO ML ### 45,405 45,405 45,405 45,405 45,405
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,618 10,314 10,337 10,427 10,393
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,988 9,988 9,988 9,988 9,988
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,430 13,430 13,430 13,430 13,430
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,029 11,029 11,029 11,029 11,029
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,637 18,637 18,637 18,637 18,637
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 36,539 36,539 36,539 36,539 36,539
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,471 9,471 9,471 9,471 9,471
14.18 LISTÓN M.H. AMARILLO M2 ### 78,209 78,209 78,209 78,209 78,209
14.19 PASO ESCALERA GRANITO ML ### 124,896 123,916 123,988 124,279 124,170
14.20 PIRLANES ALUMINIO ML ### 7,694 7,694 7,694 7,694 7,694
14.21 PIRLANES LADRILLO ML ### 33,389 33,131 33,150 33,227 33,198
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,646 48,646 48,646 48,646 48,646
14.23 PISO VINILO TRÁFICO PESADO M2 ### 56,648 56,648 56,648 56,648 56,648
14.24 PULIDA LACADA PISO MADERA M2 ### 51,487 51,487 51,487 51,487 51,487
14.25 TABLETA DE GRES 25X25 M2 ### 52,286 52,006 52,027 52,110 52,079
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,783 58,503 58,524 58,607 58,576
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,321 11,321 11,321 11,321 11,321
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 52,349 51,962 51,991 52,105 52,062
14.29 JABONERA PORCELANA ACUARIO UN ### 21,816 21,816 21,816 21,816 21,816
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14.30 Y PERCHA SIMPLE)
UN ### 130,999 130,999 130,999 130,999 130,999
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,281 10,281 10,281 10,281 10,281
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,752 23,752 23,752 23,752 23,752
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,111 15,111 15,111 15,111 15,111
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ###
i 14,670 14,670 14,670 14,670 14,670
p
14.35 REMATES BOCEL ALUMINIO ML ### i 8,799 8,799 8,799 8,799 8,799
14.36 REMATES BOCEL PORCELANA ML ### o 8,960 8,960 8,960 8,960 8,960
14.37 TAPA REGISTRO 20X20 UN ### 20,068 20,068 20,068 20,068 20,068
14.38 TAPA REGISTRO 6X6 UN ### 18,257 18,257 18,257 18,257 18,257
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,033 20,033 20,033 20,033 20,033
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO
14.40 EN SITIO M2 ### 23,159 23,159 23,159 23,159 23,159
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 69,323 69,043 69,064 69,147 69,116
14.42 MEDIA CAÑA EN GRANITO ML ### 82,689 82,689 82,689 82,689 82,689
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,860 34,860 34,860 34,860 34,860
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,936 13,936 13,936 13,936 13,936
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 109,001 109,001 109,001 109,001 109,001
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 131,586 131,586 131,586 131,586 131,586
15 CIELO RASO
15.1 APLIQUE YESO ML ### 77,639 77,639 77,639 77,639 77,639
15.2 ARMADURA MADERA Y MALLA M2 ### 37,106 37,106 37,106 37,106 37,106
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,197 58,197 58,197 58,197 58,197
15.4 CIELO RASO DURACUSTIC M2 ### 71,682 71,682 71,682 71,682 71,682
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,396 53,396 53,396 53,396 53,396
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,510 99,510 99,510 99,510 99,510
15.7 CORNISAS YESO ML ### 52,184 52,184 52,184 52,184 52,184
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 110,250 110,250 110,250 110,250 110,250
15.9 MALLA CON VENA M2 ### 13,900 13,900 13,900 13,900 13,900
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 107,676 81,975 92,255 71,694 107,676
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ###
i 119,746 101,701 103,039 108,385 106,380
p
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO i
16.10 MECÁNICAMENTE M3 ### 147,095 147,095 148,809 145,382 183,077
o
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 113,068 75,446 85,727 77,087 113,068
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 137,084 137,084 138,797 135,370 173,065
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 144,065 144,065 145,778 142,351 180,046
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 321,413 321,413 321,413 321,413 321,413
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 951,548 951,548 951,548 951,548 951,548
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 514,698 514,698 514,698 514,698 514,698
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 147,391 147,391 147,391 147,391 147,391
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 207,609 207,609 207,609 207,609 207,609
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 192,648 192,648 192,648 192,648 192,648
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 426,752 426,752 426,752 426,752 426,752
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,094,678 1,094,678 1,094,678 1,094,678 1,094,678
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 309,396 309,396 309,396 309,396 309,396
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 218,288 218,288 218,288 218,288 218,288
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 85,624 85,624 85,624 85,624 85,624
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 265,068 265,068 265,068 265,068 265,068
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 391,517 391,517 391,517 391,517 391,517
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,660 8,660 8,660 8,660 8,660
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,229 3,229 3,229 3,229 3,229
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,440 11,440 11,440 11,440 11,440
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,083 44,083 44,083 44,083 44,083
18.5 CARBURO SOBRE PAÑETES M2 ### 6,003 6,003 6,003 6,003 6,003
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 70,071 70,071 70,071 70,071 70,071
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,556 3,556 3,556 3,556 3,556
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ###
i 2,889 2,889 2,889 2,889 2,889
p
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### i 14,432 14,432 14,432 14,432 14,432
18.10 ESMALTE SOBRE MADERA LINEAL ML ### o 4,194 4,194 4,194 4,194 4,194
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,224 15,224 15,224 15,224 15,224
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,045 6,045 6,045 6,045 6,045
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,859 6,859 6,859 6,859 6,859
18.14 ESTUCO M2 ### 7,192 7,192 7,192 7,192 7,192
18.15 ESTUCO (LINEAL) ML ### 4,491 4,491 4,491 4,491 4,491
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,037 16,037 16,037 16,037 16,037
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,897 9,897 9,897 9,897 9,897
18.18 LACA PISOS MADERA M2 ### 23,340 23,340 23,340 23,340 23,340
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,769 2,769 2,769 2,769 2,769
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,781 12,781 12,781 12,781 12,781
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,442 3,442 3,442 3,442 3,442
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,059 13,059 13,059 13,059 13,059
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,328 7,328 7,328 7,328 7,328
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,584 4,584 4,584 4,584 4,584
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,841 22,841 22,841 22,841 22,841
18.26 PINTURA EPÓXICA M2 ### 13,062 13,062 13,062 13,062 13,062
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,040 8,040 8,040 8,040 8,040
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,493,703 6,493,703 6,493,703 6,493,703 6,493,703
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR) UN ### 11,473,306 11,473,306 11,473,306 11,473,306 11,473,306
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,002,321 3,002,321 3,002,321 3,002,321 3,002,321
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,812,391 9,812,391 9,812,391 9,812,391 9,812,391
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,190,384 9,190,384 9,190,384 9,190,384 9,190,384
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,769 2,769 2,769 2,769 2,769
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 920,032 920,032 920,032 920,032 920,032
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 92,129 92,129 92,129 92,129 92,129
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,667,211 1,666,988 1,667,004 1,667,070 1,667,046
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 716,902 711,557 711,953 713,537 712,943
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 121,892 121,892 121,892 121,892 121,892
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,272,768 1,272,768 1,272,768 1,272,768 1,272,768
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 159,358 159,358 159,358 159,358 159,358
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,474,234 1,474,234 1,474,234 1,474,234 1,474,234
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,027,374 1,027,374 1,027,374 1,027,374 1,027,374
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,484 63,484 63,484 63,484 63,484
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 120,999 120,999 120,999 120,999 120,999
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 285,932 285,932 285,932 285,932 285,932
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 285,925 285,925 285,925 285,925 285,925
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 459,146 459,146 459,146 459,146 459,146
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 121,050 121,050 121,050 121,050 121,050
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 121,050 121,050 121,050 121,050 121,050
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 285,932 285,932 285,932 285,932 285,932
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 285,932 285,932 285,932 285,932 285,932
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 459,146 459,146 459,146 459,146 459,146
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 459,399 459,399 459,399 459,399 459,399
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 747,190 747,190 747,190 747,190 747,190
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,199,653 1,199,653 1,199,653 1,199,653 1,199,653
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 74,089 74,089 74,089 74,089 74,089
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 384,098 384,098 384,098 384,098 384,098
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 432,187 432,187 432,187 432,187 432,187
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,195,489 1,195,489 1,195,489 1,195,489 1,195,489
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 69,898 69,725 69,738 69,789 69,770
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 348,013 348,013 348,013 348,013 348,013
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 53,065 53,065 53,065 53,065 53,065
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 75,129 75,129 75,129 75,129 75,129
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 108,504 108,504 108,504 108,504 108,504
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 166,598 166,598 166,598 166,598 166,598
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 267,915 267,915 267,915 267,915 267,915
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 387,866 387,866 387,866 387,866 387,866
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 491,100 491,100 491,100 491,100 491,100
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 645,818 645,818 645,818 645,818 645,818
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 888,958 888,958 888,958 888,958 888,958
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 77,130 76,227 76,294 76,562 76,461
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 91,482 90,579 90,646 90,914 90,813
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 58,430 56,152 56,321 56,996 56,743
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###
i 63,440 61,195 61,361 62,026 61,777
p
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### i 63,634 61,465 61,626 62,269 62,028
5.6 BORDE SEPARADOR VERDE A-170 ML ### o 269,057 268,693 268,720 268,828 268,788
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,807 18,534 18,554 18,635 18,604
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 41,737 40,132 40,251 40,727 40,548
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 87,552 87,357 87,372 87,430 87,408
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 582,038 576,731 577,124 578,696 578,107
5.11 LOSETA PREFABRICADA A-40 M2 ### 65,642 64,809 64,870 65,117 65,025
5.12 LOSETA PREFABRICADA A-60 M2 ### 95,892 95,058 95,120 95,367 95,274
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 34,664 33,766 33,832 34,098 33,998
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 56,043 54,225 54,360 54,898 54,696
5.15 SARDINEL PREFABRICADO A-10 ML ### 103,673 103,478 103,691 103,351 107,708
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 63,159 62,655 62,692 62,841 62,785
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 213,701 212,632 212,711 213,028 212,909
6.2 BANCA EN CONCRETO M-30 UN ### 704,786 703,289 703,400 703,844 703,677
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 225,816 225,592 225,609 225,675 225,650
6.4 BOLARDO M-60 CONCRETO UN ### 169,750 168,467 168,562 168,942 168,800
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 171,618 170,335 170,430 170,810 170,668
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 201,719 200,377 200,476 200,874 200,725
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 61,148 60,457 60,509 60,713 60,636
6.8 BORDILLO PREFABRICADO A-80 ML ### 71,886 71,113 71,170 71,399 71,313
6.9 CANECA M-120 UN ### 329,838 329,665 329,678 329,729 329,710
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 869,091 868,450 868,497 868,687 868,616
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,576,697 3,576,269 3,576,301 3,576,428 3,576,380
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,679,538 3,679,110 3,679,142 3,679,269 3,679,221
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 513,935 513,487 513,521 513,653 513,603
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 680,933 679,144 679,276 679,806 679,607
6.15 BANCA EN MADERA M-50 UN ### 564,968 564,968 564,968 564,968 564,968
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 260,050 259,408 259,456 259,646 259,575
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 609,073 608,641 608,673 608,801 608,753
6.18 POSTE HISTÓRICO M-131 UN ### 6,799,745 6,796,538 6,796,776 6,797,726 6,797,370
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,272 4,272 4,272 4,272 4,272
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,397 45,397 45,397 45,397 45,397
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
7.3 SEÑAL DOBLE DE CICLORUTA UN ###
i 330,917 330,735 330,749 330,803 330,782
p
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### i 520,274 519,379 519,446 519,711 519,611
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### o 245,564 245,382 245,396 245,450 245,430
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 260,994 260,812 260,826 260,880 260,860
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 272,678 272,496 272,510 272,564 272,544
7.8 TACHAS REFLECTIVAS UN ### 14,242 14,242 14,242 14,242 14,242
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,219 15,219 15,219 15,219 15,219
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 124,389 124,389 124,389 124,389 124,389
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
VÍAS (SEGÚN ESPECIFICACIONESp TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES
1.2 201 P A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO
1.4 200.2 DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.5 201.7 UNA DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES M3-KM### 1,318 1,318 1,318 1,318 1,318
2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,055 36,055 36,055 36,055 36,055
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 12,832 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
2.9 600.1 UNA DISTANCIA MENOR DE 5 KM) M3 ### 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A
2.10 600.2 UNA DISTANCIA MENOR DE 5 KM) M3 ### 65,891 65,891 65,891 65,891 65,891
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 80,664 80,664 80,664 80,664 80,664
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE
2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 19,035 19,035 19,035 19,035 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE
2.13 600.4 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 39,738 39,738 39,738 39,738 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO
2.14 600.5 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 31,203 31,203 31,203 31,203 31,203
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE
2.15 600.5 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 53,644 53,644 53,644 53,644 53,644
i
o
3 NORMA INV ESTRUCTURA DE PAVIMENTO
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 137,084 137,084 138,797 135,370 173,065
3.3 330.1 BASE GRANULAR M3 ### 144,065 144,065 145,778 142,351 180,046
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,382 3,382 3,382 3,382 3,382
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,157 1,157 1,157 1,157 1,157
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 238,269 233,162 233,540 235,053 234,486
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 69,895 68,621 68,716 69,093 68,952
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 633,224 651,347 618,397 700,772 677,707
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 659,999 678,122 645,172 727,547 704,482
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 697,877 715,999 683,049 765,424 742,359
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 667,437 685,559 652,609 734,984 711,919
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 264,037 270,595 254,079 286,123 296,895
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 301,064 301,064 302,777 299,350 337,045
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 292,639 292,639 294,353 290,926 328,621
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 40,236 40,236 40,236 40,236 40,236
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 179,848 179,848 179,848 179,848 179,848
3.15 311.1 AFIRMADO M3 ### 113,068 75,446 85,727 77,087 113,068
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,493 12,123 12,151 12,260 12,219
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,082 4,898 4,911 4,966 4,946
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3.18 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 663,062 642,878 644,373 650,354 648,111
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y
3.19 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 697,109 676,022 677,583 683,832 681,489
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y
3.20 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 719,674 698,005 699,609 706,031 703,622
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,218 7,218 7,218 7,218 7,218
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 90,505 90,505 91,955 89,055 120,951
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,750,339 1,728,957 1,730,540 1,736,877 1,734,500
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 91,348 91,348 91,348 91,348 91,348
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 371,111 368,545 368,735 369,496 369,210
4.19 632 P BARANDA METÁLICA ML ### 437,295 437,295 437,295 437,295 437,295
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,690 17,690 17,690 17,690 17,690
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 527,095 481,602 489,582 490,886 510,545
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 74,542 74,542 75,991 73,092 104,987
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 105,524 81,800 91,290 72,310 105,524
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 398,894 376,308 377,980 384,673 382,164
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 372,857 359,439 360,960 363,882 373,989
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 381,500 368,082 369,603 372,525 382,632
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 387,124 374,110 375,601 378,404 388,555
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 395,767 382,753 384,244 387,047 397,198
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 535,191 513,284 514,906 521,398 518,963
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 630,206 607,432 609,118 615,868 613,336
4.31 681.1 GAVIÓN M3 ### 181,551 181,551 182,935 180,167 210,613
4.32 681.1 GAVIÓN MALLA PVC M3 ### 185,955 185,955 187,339 184,572 215,017
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### p 43,481 42,137 42,236 42,635 42,485
i
o
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500
4.34 672.1 PSI ML ### 16,963 16,290 16,340 16,539 16,465
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 15,110 15,110 15,110 15,110 15,110
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 20,375 20,375 20,375 20,375 20,375
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN)
M2 ### 24,448 24,448 24,448 24,448 24,448
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 31,447 31,447 31,447 31,447 31,447
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 180,678 144,503 154,388 146,080 180,678
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,649 4,649 4,649 4,649 4,649
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4.53 *** INSTALACIÓN) ML ### 90,516 90,516 90,516 90,516 90,516
GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4.54 *** INSTALACIÓN) ML ### 137,963 137,963 137,963 137,963 137,963
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 546,867 524,093 525,779 532,528 529,997
4.56 682.1 P COLCHONETA RENO M3 ### 197,706 197,706 199,090 196,322 226,768
4.57 *** TRINCHO EN MADERA M2 ### 71,536 71,536 71,536 71,536 71,536
2,068,344 2,079,906
1,204,762 1,210,543
14,583 14,583
16,353 16,353
18,889 18,889
69,185 69,185
48,245 48,370
22,072 22,196
80,242 80,242
6,261 6,261
8,882 8,882
6,813 6,813
7,419 7,419
8,964 8,964
9,084 9,084
13,497 13,497
18,477 18,477
27,441 27,441
39,898 39,898
49,367 49,367
40,806 40,806
57,319 57,319
67,872 67,872
83,193 83,193
9,103 9,103
14,736 14,736
22,422 22,422
36,746 36,746
1,539 1,539
5,807 5,807
20,960 20,960
11,490 11,490
11,307 11,307
10,480 10,480
9,803 9,803
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
15,459 15,459
13,512 13,512
11,490 11,490
950,908 950,161
10,921 10,921
3,955 3,955
2,842,418 2,842,418
261,524 261,524
9,189 9,189
106,028 71,760
188,193 199,721
297,878 297,878
207,425 207,425
23,336 23,336
638,332 650,569
638,445 651,067
593,497 605,317
50,284 50,284
155,175 155,175
195,465 195,465
244,188 244,188
309,776 309,776
105,844 106,698
130,818 132,057
579,348 591,168
92,966 92,966
39,957 40,029
209,871 209,942
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
463,186 451,464
231,003 231,158
261,751 262,110
343,317 345,457
106,647 106,448
1,362,113 1,360,123
119,162 119,954
75,854 76,271
28,713 28,937
46,784 47,008
61,474 61,788
84,480 84,838
117,506 117,820
1,008,086 1,011,667
1,423,618 1,430,781
1,846,932 1,861,258
44,438 44,438
58,849 58,849
806,004 817,823
248,937 248,109
100,603 101,751
118,747 120,124
129,888 131,724
137,036 138,986
156,780 159,190
174,282 177,036
193,317 196,415
103,989 104,186
962,093 973,912
100,191 100,347
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
79,437 80,619
89,155 90,601
103,654 105,467
701,057 712,877
49,770 50,132
278,370 283,649
4,433 4,433
4,649 4,649
6,427 6,427
849,744 861,563
770,668 783,606
844,501 856,320
824,451 836,270
1,035,588 1,047,407
304,992 318,223
29,664 29,976
50,127 50,440
35,990 36,062
168,800 168,944
44,515 44,876
27,655 27,811
104,058 104,344
91,937 93,142
95,463 95,463
55,655 55,655
91,854 91,854
53,851 53,851
107,071 107,071
62,780 62,780
119,314 119,314
68,902 68,902
42,273 42,417
25,450 25,522
55,629 55,725
33,194 33,242
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
62,563 62,659
37,334 37,382
103,359 103,839
60,759 60,999
38,763 38,859
23,362 23,410
77,401 77,593
46,362 46,458
92,488 92,644
55,583 55,660
191,071 191,743
113,929 114,265
94,124 94,449
56,401 56,563
48,758 48,973
29,478 29,585
35,051 35,147
21,231 21,279
53,290 53,482
32,426 32,522
103,150 103,438
62,323 62,467
75,239 75,431
45,144 45,240
158,077 158,748
95,491 95,826
32,979 33,050
37,643 37,877
63,676 63,987
5,289 5,289
50,498 50,811
10,686 10,686
14,227 14,227
18,624 18,624
26,249 26,249
39,380 39,380
4,865 4,954
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
16,381 16,381
5,736 5,808
6,922 6,994
8,266 8,337
7,147 7,147
14,002 14,002
24,352 24,579
14,770 14,883
21,280 21,481
12,924 13,025
20,461 20,688
12,514 12,628
21,280 21,481
12,924 13,025
21,981 22,143
13,273 13,354
17,696 17,849
10,843 10,920
17,071 17,244
10,531 10,618
22,058 22,260
13,293 13,394
21,239 21,466
12,883 12,997
17,682 17,855
10,818 10,905
22,128 22,355
13,732 13,846
27,065 27,353
85,734 86,337
58,438 58,438
23,095 23,095
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
36,337 36,337
85,553 85,553
66,876 66,876
38,669 38,669
89,689 89,689
107,200 107,200
157,796 157,796
61,930 61,930
85,827 85,827
77,931 77,931
139,282 139,282
81,474 81,474
59,736 59,736
33,585 33,585
61,019 61,377
49,811 49,811
45,636 45,636
38,179 38,179
37,410 37,410
37,696 37,696
53,322 53,322
46,816 46,816
86,040 86,040
159,326 159,326
71,455 71,455
44,028 44,028
34,622 34,622
60,909 60,909
20,661 20,661
24,967 24,967
27,136 27,136
35,085 35,085
23,025 23,025
54,281 54,281
378,516 378,516
422,485 422,485
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
285,616 285,616
305,735 305,735
446,277 458,662
388,599 400,074
385,535 397,415
337,308 349,358
312,407 324,832
280,998 293,844
235,572 245,453
457,468 467,062
418,453 429,272
484,712 494,830
725,332 735,450
129,504 129,504
4,021 4,093
144,485 144,485
177,424 177,424
259,756 259,756
289,229 289,229
318,734 318,734
211,940 211,940
240,356 240,356
354,018 354,018
133,798 133,798
177,842 177,842
197,733 197,733
504,620 504,620
44,103 44,103
27,214 27,214
104,225 104,225
128,922 128,922
100,080 100,080
30,803 30,803
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
30,803 30,803
29,183 29,183
44,543 44,543
55,306 55,306
66,786 66,786
80,419 80,419
380,535 380,535
265,737 265,737
35,216 35,216
45,261 45,261
55,306 55,306
69,656 69,656
79,862 79,862
224,162 224,162
84,243 84,243
149,707 149,707
143,103 143,103
93,930 93,930
221,941 221,941
115,279 115,279
6,897 6,897
103,002 103,002
127,347 127,347
42,443 42,443
572,404 572,404
205,185 205,185
229,025 229,025
521,150 521,150
133,357 133,357
417,804 417,804
6,309 6,309
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
293,014 293,014
127,199 127,199
90,613 90,613
93,353 93,353
10,961 10,961
12,193 12,193
9,635 9,635
229,687 229,687
278,169 278,169
23,095 23,095
36,337 36,337
34,733 34,733
44,651 44,651
92,397 92,397
231,136 231,136
44,362 44,362
616,334 616,334
1,268,924 1,268,924
36,375 36,375
68,717 68,717
102,835 102,835
87,255 87,255
63,045 63,045
67,203 67,203
84,952 84,952
68,858 68,858
86,607 86,607
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
92,758 92,758
77,399 77,399
13,067 13,067
18,484 18,484
24,116 24,116
14,842 14,842
8,830 8,830
53,934 53,934
34,429 34,429
11,082 11,082
26,514 26,514
36,852 36,852
50,056 50,056
94,038 94,038
113,780 113,780
63,356 63,356
80,861 80,861
195,901 195,901
404,891 404,891
298,782 298,782
18,437 18,437
23,286 23,286
181,230 181,230
295,820 295,820
492,889 492,889
42,627 42,627
50,301 50,301
64,195 64,195
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
73,134 73,134
94,303 94,303
108,537 108,537
160,260 160,260
64,353 64,353
64,622 64,622
41,924 41,924
51,812 51,812
4,408 4,408
6,967 6,967
1,073,737 1,073,737
818,282 818,282
2,772,337 2,772,337
2,310,210 2,310,210
665,799 665,799
863,571 863,571
334,549 334,549
384,061 384,061
61,033 61,033
72,344 72,344
80,208 80,208
94,589 94,589
57,327 57,327
65,392 65,392
150,338 150,338
58,902 58,902
135,502 135,502
80,927 80,927
48,002 48,002
100,906 100,906
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
430,570 430,570
574,098 574,098
3,719 3,719
4,908 4,908
7,647 7,647
13,668 13,668
287,490 287,490
81,027 81,027
110,036 110,036
44,326 44,326
1,468,779 1,468,779
1,088,165 1,088,165
1,371,066 1,371,066
639,782 639,782
116,053 116,053
537,005 537,005
672,157 672,157
1,777,357 1,777,357
1,308,501 1,308,501
40,815 41,205
40,823 41,212
15,032 15,110
28,055 28,833
88,653 89,431
26,613 26,861
56,623 57,828
78,166 80,094
31,997 31,997
23,920 23,920
27,985 27,985
45,899 46,983
53,686 55,012
77,667 79,715
83,128 92,351
91,129 91,048
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
59,868 60,024
35,608 35,685
68,003 68,392
71,553 71,942
76,072 76,461
79,417 79,573
37,562 37,731
172,526 173,227
46,772 47,188
45,405 45,405
10,112 10,281
9,988 9,988
13,430 13,430
11,029 11,029
18,637 18,637
36,539 36,539
9,471 9,471
78,209 78,209
123,262 123,807
7,694 7,694
32,959 33,102
48,646 48,646
56,648 56,648
51,487 51,487
51,819 51,975
58,316 58,472
11,321 11,321
51,704 51,919
21,816 21,816
130,999 130,999
10,281 10,281
23,752 23,752
15,111 15,111
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
14,670 14,670
8,799 8,799
8,960 8,960
20,068 20,068
18,257 18,257
20,033 20,033
23,159 23,159
68,856 69,012
82,689 82,689
34,860 34,860
13,936 13,936
109,001 109,001
131,586 131,586
77,639 77,639
37,106 37,106
58,197 58,197
71,682 71,682
53,396 53,396
99,510 99,510
52,184 52,184
110,250 110,250
13,900 13,900
5,627 5,627
18,479 18,479
25,905 25,905
43,707 43,707
49,987 49,987
85,005 85,005
19,114 19,114
90,542 56,274
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
89,671 99,697
181,363 147,095
95,934 61,666
162,276 137,084
178,333 144,065
321,413 321,413
951,548 951,548
514,698 514,698
147,391 147,391
207,609 207,609
192,648 192,648
426,752 426,752
1,094,678 1,094,678
309,396 309,396
218,288 218,288
85,624 85,624
265,068 265,068
391,517 391,517
8,660 8,660
3,229 3,229
11,440 11,440
44,083 44,083
6,003 6,003
70,071 70,071
3,556 3,556
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
2,889 2,889
14,432 14,432
4,194 4,194
15,224 15,224
6,045 6,045
6,859 6,859
7,192 7,192
4,491 4,491
16,037 16,037
9,897 9,897
23,340 23,340
2,769 2,769
12,781 12,781
3,442 3,442
13,059 13,059
7,328 7,328
4,584 4,584
22,841 22,841
13,062 13,062
8,040 8,040
6,493,703 6,493,703
11,473,306 11,473,306
3,002,321 3,002,321
9,812,391 9,812,391
9,190,384 9,190,384
2,769 2,769
920,032 920,032
92,129 92,129
1,666,839 1,666,963
707,993 710,963
30,723 30,723
45,927 45,927
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
57,035 57,035
18,378 18,378
22,333 22,333
30,540 30,540
26,928 26,928
28,408 28,408
35,618 35,618
18,683 18,683
24,535 24,535
37,838 37,838
291,041 291,041
335,103 335,103
349,296 349,296
323,341 323,341
236,118 236,118
36,328 36,328
109,786 109,786
275,309 275,309
54,647 54,647
608,535 608,535
1,516,564 1,516,564
45,546 45,546
236,629 236,629
45,898 45,898
3,976 3,976
6,733 6,733
19,160 19,160
25,175 25,175
32,764 32,764
130,559 130,559
34,043 34,043
111,711 111,711
191,538 191,538
303,779 303,779
376,104 376,104
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
411,624 411,624
598,908 598,908
351,676 351,676
110,615 110,615
14,794 14,794
30,280 30,280
5,252 5,252
36,815 36,815
38,509 38,509
39,354 39,354
25,656 25,656
28,440 28,440
29,611 29,611
50,177 50,177
651,869 651,869
333,682 333,682
92,217 92,217
1,922 1,922
8,891 8,891
13,338 13,338
22,324 22,324
4,109 4,109
22,866 22,866
33,469 33,469
20,103 20,103
16,150 16,150
660,708 660,708
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
URBANISMO
9,712 9,712
96,641 96,641
545,500 545,500
1,164,403 1,164,403
133,301 133,301
813,379 813,379
1,751,240 1,751,240
13,705 13,705
16,969 16,969
21,377 21,377
23,423 23,423
28,136 28,136
28,136 28,136
114,013 114,013
132,026 132,026
408,742 408,742
153,539 153,539
253,104 253,104
1,120,834 1,120,834
1,291,469 1,291,469
14,958 14,958
13,175 13,175
33,006 33,006
130,384 130,384
194,487 194,487
31,627 31,627
109,198 109,198
162,136 162,136
32,034 32,034
66,130 66,130
267,020 267,020
77,212 77,212
310,779 310,779
185,526 185,526
530,304 530,304
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
1,423,266 1,423,266
2,103,162 2,103,162
11,064 11,064
25,229 25,229
19,114 19,114
79,263 90,036
85,507 51,239
100,994 66,726
80,087 59,590
81,497 60,602
79,857 89,165
121,892 121,892
1,272,768 1,272,768
159,358 159,358
1,474,234 1,474,234
1,027,374 1,027,374
63,484 63,484
120,999 120,999
285,932 285,932
285,925 285,925
459,146 459,146
121,050 121,050
121,050 121,050
285,932 285,932
285,932 285,932
459,146 459,146
459,399 459,399
747,190 747,190
1,199,653 1,199,653
74,089 74,089
384,098 384,098
432,187 432,187
1,195,489 1,195,489
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
69,610 69,706
348,013 348,013
53,065 53,065
75,129 75,129
108,504 108,504
166,598 166,598
267,915 267,915
387,866 387,866
491,100 491,100
645,818 645,818
888,958 888,958
679,464 686,592
669,873 674,831
734,406 739,158
807,029 815,939
954,681 961,663
845,699 852,233
1,011,111 1,014,537
1,457,005 1,466,988
2,001,392 2,020,220
2,633,856 2,665,153
1,936,658 1,936,658
4,106,486 4,106,486
142,715 142,917
75,626 76,127
89,978 90,479
54,634 55,899
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
59,698 60,945
60,020 61,224
268,450 268,653
18,351 18,503
39,062 39,954
87,228 87,336
573,193 576,141
64,253 64,716
94,503 94,966
33,167 33,666
53,013 54,023
107,328 103,456
62,318 62,599
211,919 212,513
702,291 703,123
225,443 225,567
167,612 168,325
169,480 170,192
199,482 200,228
59,997 60,381
70,597 71,027
329,550 329,646
868,022 868,379
3,575,984 3,576,222
3,678,825 3,679,063
513,189 513,438
677,951 678,945
564,968 564,968
258,981 259,337
608,353 608,593
6,794,400 6,796,182
4,272 4,272
45,397 45,397
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
330,614 330,715
518,783 519,280
245,261 245,362
260,691 260,792
272,375 272,476
14,242 14,242
15,219 15,219
124,389 124,389
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
PECIFICACIONES TÉCNICAS INVIAS 2007)
152,777 152,777
53,673 53,673
2,613,971 2,613,971
933,801 933,801
89,524 89,524
1,318 1,318
9,548 9,548
36,055 36,055
8,749 8,749
14,967 14,967
13,068 13,068
7,499 7,499
481 481
12,832 12,832
20,948 20,948
65,891 65,891
80,664 80,664
19,035 19,035
39,738 39,738
31,203 31,203
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
53,644 53,644
5,366 5,366
162,276 137,084
178,333 144,065
139,125 139,125
3,382 3,382
1,157 1,157
229,757 232,594
67,772 68,480
671,117 651,347
697,892 678,122
735,769 715,999
705,329 685,559
275,221 288,987
335,332 301,064
317,832 292,639
40,236 40,236
179,848 179,848
95,934 61,666
11,877 12,082
4,775 4,877
629,422 640,636
661,963 673,679
683,558 695,597
7,218 7,218
119,501 90,505
900,647 913,367
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
773,775 786,284
819,193 832,197
556,489 568,079
652,110 664,159
553,394 565,393
648,893 661,367
712,425 724,424
571,914 584,388
755,414 767,888
12,175 12,175
15,716 15,716
1,845 1,845
2,791,003 2,791,003
4,135,946 4,157,705
1,714,701 1,726,581
91,348 91,348
366,834 368,260
437,295 437,295
17,690 17,690
479,316 470,640
103,538 74,542
89,708 58,076
361,249 373,799
361,038 357,949
369,681 366,592
375,978 372,664
384,621 381,307
498,679 510,850
592,249 604,901
209,229 181,551
213,633 185,955
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
41,240 41,987
15,842 16,215
10,564 10,564
15,110 15,110
20,375 20,375
24,448 24,448
31,447 31,447
7,582 7,582
8,651 8,651
8,994 8,994
6,384 6,384
9,657 9,657
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
7,860 7,860
9,657 9,657
18,629 18,629
661,955 662,112
373,062 375,750
928,796 928,796
164,203 131,253
4,649 4,649
90,516 90,516
137,963 137,963
508,910 521,562
225,384 197,706
71,536 71,536
4,272 4,272
45,397 45,397
88,275 88,275
73,385 73,385
153,983 154,627
14,242 14,242
851 851
131,984 131,984
25,566 25,566
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
8,310 8,310
448,890 448,890
1,804 1,804
16,155 16,155
26,253 26,253
9,800 9,800
APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
CONSTRUCCIÓN p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,970,650
1.2 CAMPAMENTO 9 M2 UN ### 1,152,377
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,189
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,907
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,394
1.6 CERCA EN TABLA H=2.30 M ML ### 66,040
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 45,993
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,094
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 910,145
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,468
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,776
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,702,927
1.44 RED TELEFÓNICA PROVISIONAL UN ### 250,021
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 183,592
2.2 BASE ARENA CEMENTO 1:20 M3 ### 165,405
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,280
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 601,366
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 602,999
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 561,356
2.9 PILOTE DE MADERA D=20 CM ML ### 49,757
2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 153,462
2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 191,648
2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 237,826
2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 299,989
2.14 PILOTE HINCADO 25X25 ML ### 102,427
2.15 PILOTE HINCADO 30X30 ML ### 125,866
2.16 DADOS EN CONCRETO 3500PSI M3 ### 547,207
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 91,839
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,489
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 56,101
4.3 COLUMNAS 3500 PSI M3 ### 768,275
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 235,320
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.5 PSI M2 ### 95,022
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.6 PSI
M2 ### 111,986
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 123,759
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 130,531
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 148,950
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 165,413
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 183,432
4.12 ENTREPISO VIGUETA PLACA M2 ### 99,391
4.13 ESCALERA MACIZA 3500 PSI M3 ### 917,187
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 95,617
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 75,562
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 84,584
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 98,114
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 667,147
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,343
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 264,032
4.21 ACERO FIGURADO 37000 PSI KG ### 4,219
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
4.22 ACERO FIGURADO 60000 PSI KG ###
i 4,425
p
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### i 6,200
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### o 814,357
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 734,573
4.26 VIGA AÉREA 3500 PSI M3 ### 808,401
4.27 VIGA CINTA 3500 PSI M3 ### 788,325
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 998,895
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 274,427
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 28,789
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,180
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,025
5.4 ARCOS EN LADRILLO PRENSADO ML ### 164,455
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,128
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,997
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 99,152
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 87,422
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 92,071
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,959
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 88,663
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,255
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 102,849
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,670
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 114,417
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,454
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 40,619
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,623
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 53,217
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 31,988
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,899
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,002
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 98,625
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,392
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,330
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,646
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 74,293
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ###
i 44,807
p
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### i 88,516
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### o 53,597
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 181,787
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 109,287
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 89,588
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,133
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 46,683
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,440
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,788
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,600
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 50,955
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,259
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 98,548
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,022
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 71,976
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,478
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 150,600
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 91,703
5.47 REMATES LADRILLO PRENSADO ML ### 31,807
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 35,931
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 60,956
5.50 LAVADA DE FACHADA M2 ### 5,254
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,543
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,618
5.53 ANCLAJE 3/8" L=30CM UN ### 14,015
5.54 ANCLAJE 1/2" L=50CM UN ### 18,311
5.55 ANCLAJE 5/8" L=70CM UN ### 25,610
5.56 ANCLAJE 3/4" L=70CM UN ### 38,156
5.57 ANCLAJE 1" L= 70CM UN ### 4,631
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 26,120
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### 81,670
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,780
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,273
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,959
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 81,465
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,823
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,177
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 85,373
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 101,917
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 149,715
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 59,243
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
7.13 CANAL PVC AMAZONAS ML ###
i 82,374
p
7.14 CANAL PVC RAINGO ML ### i 74,913
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### o 132,726
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 77,484
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 56,949
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,554
7.19 TEJA DE BARRO M2 ### 58,689
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 47,470
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,526
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,805
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 36,030
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 36,300
7.25 TEJA TERMOACÚSTICA M2 ### 51,018
7.26 TEJA PLÁSTICA No.6 M2 ### 44,872
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 82,018
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 151,317
7.29 TEJA SIN TRASLAPO M2 ### 68,073
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,883
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,568
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 58,401
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,171
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,239
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,242
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,751
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,315
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,519
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 358,258
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 411,875
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 272,707
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 291,229
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 414,120
8.2 CONCRETO 3500 PSI M3 ### 358,323
8.3 CONCRETO 3000 PSI M3 ### 354,122
8.4 CONCRETO 2500 PSI M3 ### 311,477
8.5 CONCRETO 2000 PSI M3 ### 285,000
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
8.6 CONCRETO 1500 PSI M3 ###
i 251,323
p
8.7 MORTERO SECO 1:10 M3 ### i 212,985
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### o 425,982
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 383,277
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 446,951
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 674,271
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 124,112
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,796
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 138,973
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 170,090
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 246,865
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 274,744
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 302,655
9.8 HOJA PUERTA FORTEC 0.81 UN ### 200,939
9.9 HOJA PUERTA FORTEC 0.91 UN ### 227,783
9.10 HOJA PUERTA FORTEC 1.50 UN ### 335,158
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 127,118
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 168,726
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 187,517
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 477,431
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,438
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,483
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 100,338
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 122,167
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 94,920
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,475
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,475
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,945
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,758
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,925
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,770
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 76,648
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 360,693
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 252,244
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,946
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
9.30 VIDRIO TRANSPARENTE 4 MM M2 ###
i 43,435
p
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### i 52,925
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### o 66,482
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 76,684
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 213,003
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 81,238
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 145,560
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 137,664
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 90,388
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 212,928
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 110,970
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,661
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 100,406
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 121,915
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,336
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 542,998
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 195,386
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 219,458
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 495,219
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 129,521
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 395,935
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,084
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 278,579
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 123,264
10.21 REJILLA PISO 0.30 M M2 ### 86,905
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 89,739
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,664
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,
10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,828
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,412
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO
i
p
11.1 ACOMETIDA EN PVC 1/2" 5M UN ### i 222,947
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### o 268,753
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,273
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 34,959
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,557
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 43,004
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 88,612
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 224,316
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,295
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924
11.12 LLAVE MANGUERA UN ### 35,357
11.13 NIPLE PASAMURO 2" UN ### 67,302
11.14 NIPLE PASAMURO 4" UN ### 100,557
11.15 PUNTO AGUA CALIENTE CPVC UN ### 84,813
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 61,942
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 65,872
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 83,236
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 67,036
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 83,805
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 89,617
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 74,201
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,583
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,700
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,114
11.26 RED SUMINISTRO PVC 1" ML ### 14,286
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,540
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 51,449
11.29 RED SUMINISTRO PVC 2" ML ### 32,923
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,691
11.31 RED SANITARIA PVC-S 2" ML ### 25,445
11.32 RED SANITARIA PVC-S 3" ML ### 35,291
11.33 RED SANITARIA PVC-S 4" ML ### 47,885
11.34 RED SANITARIA PVC-S 6" ML ### 89,433
11.35 REGISTRO 1" UN ### 108,680
11.36 REGISTRO 1/2" UN ### 60,598
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
11.37 REGISTRO 3/4" UN ###
i 77,134
p
11.38 REGISTRO 1 1/2" UN ### i 186,259
11.39 REGISTRO 2 1/2" UN ### o 383,988
11.40 REGISTRO 2" UN ### 283,748
11.41 REVENTILACIÓN 2" ML ### 17,748
11.42 REVENTILACIÓN 3" ML ### 22,396
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 174,189
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 283,436
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 471,593
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 40,783
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 48,085
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 61,745
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 69,971
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 90,160
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 104,489
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 154,567
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,307
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,561
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 40,311
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 49,653
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,204
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,623
11.59 GABINETE TIPO III UN ### 1,023,602
11.60 GABINETE TIPO I UN ### 782,276
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,626,606
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,190,039
11.63 VÁLVULA MARIPOSA 3" UN ### 636,630
11.64 VÁLVULA MARIPOSA 4" UN ### 823,463
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 316,683
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 366,502
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 58,230
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 68,919
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 76,533
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 90,123
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,751
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
12.7 SALIDA TIMBRE PVC COMPLETA UN ###
i 62,398
p
12.8 STRIP TELEFÓNICO 10 PARES UN ### i 144,171
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### o 56,217
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 129,176
12.11 SALIDA T.V PVC COMPLETA. UN ### 77,267
12.12 SALIDA BIFÁSICA C.N. UN ### 45,815
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 96,615
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 412,580
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 549,443
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,557
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,697
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,307
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,072
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 274,619
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 77,630
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 105,035
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,959
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,408,618
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,043,963
12.26 POSTE METÁLICO 6M UN ### 1,303,801
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 606,385
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 110,828
12.29 LUMINARIA 70W SODIO UN ### 508,727
12.30 LUMINARIA 150W SODIO UN ### 636,405
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,680,545
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,237,621
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 38,838
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 38,527
13.3 ALISTADO PARA LISTÓN M2 ### 14,594
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 25,783
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 83,284
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 25,971
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 53,910
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 73,831
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,697
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
13.10 PEGANTE MORTERO-CONCRETO M2 ###
i 23,243
p
13.11 PERMA PLY 2 CAPAS M2 ### i 27,289
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### o 43,509
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 50,780
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 73,145
13.15 TRITURADO FINO 1/2 M3 ### 59,433
13.16 TRITURADO GRUESO 3/4 M3 ### 93,830
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,407
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,375
14.3 ADOQUÍN CONCRETO 6CM M2 ### 64,934
14.4 ADOQUÍN CONCRETO 8CM M2 ### 68,284
14.5 ADOQUÍN GRES PEATONAL M2 ### 72,603
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 75,810
14.7 GRAVILLA PARA GRADAS ML ### 37,000
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 163,804
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 45,403
14.10 GUARDAESCOBA EN GRANITO ML ### 44,442
14.11 GUARDAESCOBA EN GRAVILLA ML ### 9,660
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,507
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,758
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,677
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,864
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,777
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,361
14.18 LISTÓN M.H. AMARILLO M2 ### 75,432
14.19 PASO ESCALERA GRANITO ML ### 118,446
14.20 PIRLANES ALUMINIO ML ### 7,658
14.21 PIRLANES LADRILLO ML ### 32,058
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 46,524
14.23 PISO VINILO TRÁFICO PESADO M2 ### 54,054
14.24 PULIDA LACADA PISO MADERA M2 ### 49,887
14.25 TABLETA DE GRES 25X25 M2 ### 49,738
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 55,875
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,108
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 49,624
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
14.29 JABONERA PORCELANA ACUARIO UN ###
i 20,904
p
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### i 125,045
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### o 10,098
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,825
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,663
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,247
14.35 REMATES BOCEL ALUMINIO ML ### 8,681
14.36 REMATES BOCEL PORCELANA ML ### 8,833
14.37 TAPA REGISTRO 20X20 UN ### 19,346
14.38 TAPA REGISTRO 6X6 UN ### 17,635
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,925
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 21,878
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 65,661
14.42 MEDIA CAÑA EN GRANITO ML ### 78,529
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,653
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,465
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 103,103
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 124,842
15 CIELO RASO
15.1 APLIQUE YESO ML ### 73,788
15.2 ARMADURA MADERA Y MALLA M2 ### 36,474
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 56,238
15.4 CIELO RASO DURACUSTIC M2 ### 68,977
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,496
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 95,421
15.7 CORNISAS YESO ML ### 49,520
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 105,443
15.9 MALLA CON VENA M2 ### 13,648
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16.2 MENOR DE 5 KM)
M3 ### 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 49,987
i
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### o 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 183,592
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 59,771
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 194,492
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 173,498
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 178,500
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 191,461
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 306,023
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 901,570
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 488,617
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 141,890
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 198,513
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 184,379
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 405,535
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,036,784
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 294,670
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 208,866
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 83,275
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA) UN ### 252,794
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17.13 ACCESORIOS Y GRIFERÍA) UN ### 372,249
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,438
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,126
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,247
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,724
18.5 CARBURO SOBRE PAÑETES M2 ### 5,895
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 66,492
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,507
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,806
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ###
i 14,090
p
18.10 ESMALTE SOBRE MADERA LINEAL ML ### i 4,081
18.11 ESMALTE SOBRE MADERA LLENA M2 ### o 14,857
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,810
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,612
18.14 ESTUCO M2 ### 7,091
18.15 ESTUCO (LINEAL) ML ### 4,441
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,684
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,721
18.18 LACA PISOS MADERA M2 ### 22,997
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,715
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,312
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,322
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,732
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,160
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,500
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,052
18.26 PINTURA EPÓXICA M2 ### 12,815
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,917
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,138,202
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR
19.2 (PAR) UN ### 10,845,253
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,838,243
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,275,501
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,686,118
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,715
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 871,183
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 87,033
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,575,947
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 672,591
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 115,375
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,202,671
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 150,767
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,392,994
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 970,924
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,730
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 114,531
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 270,417
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 270,411
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 434,126
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 114,580
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 114,580
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 270,417
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 270,417
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 434,126
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 436,240
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 708,115
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,136,408
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 70,226
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 365,104
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 409,031
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,132,283
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 65,932
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 331,015
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 50,347
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 71,194
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 102,726
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 157,682
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 253,396
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 367,870
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 465,470
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 611,995
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 841,688
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 71,993
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 85,513
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 51,719
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 56,197
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 56,638
5.6 BORDE SEPARADOR VERDE A-170 ML ### 254,029
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 17,931
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ###
i 37,056
p
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### i 83,316
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### o 547,003
5.11 LOSETA PREFABRICADA A-40 M2 ### 61,075
5.12 LOSETA PREFABRICADA A-60 M2 ### 89,356
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 31,624
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 50,120
5.15 SARDINEL PREFABRICADO A-10 ML ### 102,844
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 59,407
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 201,414
6.2 BANCA EN CONCRETO M-30 UN ### 665,453
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 214,939
6.4 BOLARDO M-60 CONCRETO UN ### 159,802
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 161,670
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 189,908
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 57,722
6.8 BORDILLO PREFABRICADO A-80 ML ### 66,806
6.9 CANECA M-120 UN ### 312,372
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 823,326
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,382,510
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,479,664
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 485,750
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 641,119
6.15 BANCA EN MADERA M-50 UN ### 535,530
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 247,099
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 575,662
6.18 POSTE HISTÓRICO M-131 UN ### 6,425,071
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,043
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,426
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 313,708
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 493,076
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 234,772
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 249,348
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ###
i 260,386
p
7.8 TACHAS REFLECTIVAS UN ### i 13,573
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### o 14,494
7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 117,926
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS p 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM) M3 ### 152,777
1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.3 200.1 5KM) HA ### 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.4 200.2 DISTANCIA DE 5KM)
HA ### 933,801
1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y
1.6 *** DERRUMBES M3-KM### 1,318
4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,125
4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,218
4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,519
4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,218
4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 17,693
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN
DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
CONSTRUCCIÓN
2,019,431
1,176,767
14,189
15,907
18,394
66,040
46,547
21,647
80,242
6,261
8,882
6,813
7,419
8,964
9,084
13,497
18,477
27,441
39,898
49,367
40,806
57,319
67,872
83,193
9,103
14,736
22,422
36,746
233,157
1,539
5,807
20,960
11,490
11,307
10,480
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
9,803
15,459
13,512
11,490
914,685
10,468
3,776
2,702,927
250,021
9,189
166,458
215,017
297,878
207,425
22,280
655,004
659,629
614,383
49,757
153,462
191,648
237,826
299,989
106,388
131,607
600,234
91,839
38,660
199,518
496,610
229,323
262,804
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
343,593
105,378
1,296,916
117,171
73,859
27,919
45,048
59,110
80,940
112,085
961,940
1,358,934
1,767,724
42,489
56,101
821,301
261,552
100,170
118,164
131,996
139,283
159,762
177,769
197,332
100,219
970,214
96,553
80,865
91,071
106,248
720,174
50,019
287,714
4,219
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
4,425
6,200
867,384
792,581
861,428
841,351
1,051,922
330,254
30,214
50,605
35,334
165,071
44,804
27,932
100,385
93,009
92,071
53,959
88,663
52,255
102,849
60,670
114,417
66,454
41,239
24,933
53,630
32,194
60,312
36,209
100,690
59,424
37,742
22,852
75,118
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
45,220
89,452
54,064
184,677
110,733
90,873
54,775
47,607
28,902
34,201
20,806
51,781
31,672
99,786
60,641
72,802
43,890
153,490
93,148
32,116
36,855
62,189
5,254
50,968
10,618
14,015
18,311
25,610
38,156
5,020
16,186
5,872
7,058
8,345
6,881
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
13,744
24,512
14,850
21,486
13,027
20,621
12,595
21,486
13,027
21,805
13,185
17,852
10,922
17,194
10,592
22,264
13,396
21,400
12,964
17,804
10,880
22,289
13,813
27,359
84,463
55,780
22,273
34,959
81,465
63,823
37,177
85,373
101,917
149,715
59,243
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
82,374
74,913
132,726
77,484
56,949
32,554
60,230
47,470
43,526
36,805
36,030
36,300
51,018
44,872
82,018
151,317
68,073
42,883
33,568
58,401
20,171
24,239
26,242
33,751
22,315
52,519
358,258
411,875
272,707
291,229
471,534
409,805
406,198
367,339
340,350
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
305,524
255,509
467,275
426,110
487,011
714,331
124,112
4,105
138,973
170,090
246,865
274,744
302,655
200,939
227,783
335,158
127,118
168,726
187,517
477,431
42,438
26,483
100,338
122,167
94,920
29,475
29,475
27,945
42,758
52,925
63,770
76,648
360,693
252,244
33,946
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
43,435
52,925
66,482
76,684
213,003
81,238
145,560
137,664
90,388
212,928
110,970
6,661
100,406
121,915
41,336
542,998
195,386
219,458
495,219
129,521
395,935
6,084
278,579
123,264
86,905
89,739
10,664
11,828
9,412
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
222,947
268,753
22,273
34,959
33,557
43,004
88,612
224,316
44,295
616,334
1,268,924
35,357
67,302
100,557
84,813
61,942
65,872
83,236
67,036
83,805
89,617
74,201
12,583
17,700
23,114
14,286
8,540
51,449
32,923
10,691
25,445
35,291
47,885
89,433
108,680
60,598
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
77,134
186,259
383,988
283,748
17,748
22,396
174,189
283,436
471,593
40,783
48,085
61,745
69,971
90,160
104,489
154,567
62,307
62,561
40,311
49,653
4,204
6,623
1,023,602
782,276
2,626,606
2,190,039
636,630
823,463
316,683
366,502
58,230
68,919
76,533
90,123
54,751
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
62,398
144,171
56,217
129,176
77,267
45,815
96,615
412,580
549,443
3,557
4,697
7,307
13,072
274,619
77,630
105,035
42,959
1,408,618
1,043,963
1,303,801
606,385
110,828
508,727
636,405
1,680,545
1,237,621
40,379
40,067
14,902
28,864
86,365
27,078
59,496
82,768
30,697
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
23,243
27,289
48,536
56,924
82,642
91,172
116,967
58,023
34,683
66,475
69,825
74,144
76,427
37,591
166,577
46,892
44,442
10,250
9,507
12,758
10,677
17,864
34,777
9,361
75,432
120,603
7,658
32,674
46,524
54,054
49,887
50,354
56,492
11,108
50,548
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
20,904
125,045
10,098
22,825
14,663
14,247
8,681
8,833
19,346
17,635
18,925
21,878
66,277
78,529
34,653
13,465
103,103
124,842
73,788
36,474
56,238
68,977
51,496
95,421
49,520
105,443
13,648
5,627
18,479
25,905
43,707
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
49,987
85,005
19,114
166,458
90,796
177,358
156,364
167,915
174,327
306,023
901,570
488,617
141,890
198,513
184,379
405,535
1,036,784
294,670
208,866
83,275
252,794
372,249
8,438
3,126
11,247
42,724
5,895
66,492
3,507
2,806
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
14,090
4,081
14,857
5,810
6,612
7,091
4,441
15,684
9,721
22,997
2,715
12,312
3,322
12,732
7,160
4,500
22,052
12,815
7,917
6,138,202
10,845,253
2,838,243
9,275,501
8,686,118
2,715
871,183
87,033
1,576,521
685,610
29,658
44,087
54,666
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
17,802
21,571
29,417
26,312
27,740
34,694
17,839
23,384
35,972
275,810
317,435
331,064
307,092
224,187
34,364
104,655
265,722
52,564
579,578
1,437,197
45,196
224,247
44,437
3,803
6,389
18,805
24,644
31,997
124,168
32,396
105,935
185,644
291,678
362,353
395,908
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
579,884
341,625
105,232
14,016
28,646
5,055
35,620
37,219
38,019
24,801
27,432
28,537
47,966
620,515
318,752
89,467
1,856
8,568
12,777
21,324
3,952
22,541
32,792
19,554
15,539
626,180
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
URBANISMO
9,712
91,669
516,075
1,101,492
126,302
769,138
1,655,127
13,245
16,328
20,493
22,425
26,877
26,877
107,931
125,022
386,881
145,271
239,478
1,059,588
1,220,786
14,355
12,670
31,210
123,919
184,476
30,176
103,904
153,914
30,487
62,845
252,997
73,314
294,336
176,607
502,300
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
1,344,964
1,987,316
10,840
24,776
19,114
79,524
161,423
161,423
135,467
91,939
105,553
115,375
1,202,671
150,767
1,392,994
970,924
62,730
114,531
270,417
270,411
434,126
114,580
114,580
270,417
270,417
434,126
436,240
708,115
1,136,408
70,226
365,104
409,031
1,132,283
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
66,345
331,015
50,347
71,194
102,726
157,682
253,396
367,870
465,470
611,995
841,688
677,100
654,874
719,446
804,405
929,852
831,263
998,849
1,452,575
1,996,716
2,657,113
1,842,456
3,896,870
139,255
74,150
87,670
57,584
61,665
62,043
254,830
18,635
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
41,189
83,744
557,749
62,908
91,190
33,812
54,546
101,282
60,517
204,018
669,099
215,493
162,927
164,794
193,229
59,374
68,655
312,785
824,888
3,383,551
3,480,705
486,857
645,547
535,530
248,662
576,695
6,432,882
4,043
43,426
314,109
495,290
235,172
249,748
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
260,786
13,573
14,494
117,926
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
ESPECIFICACIONES TÉCNICAS INVIAS 2007)
152,777
53,673
2,613,971
933,801
89,524
1,318
9,548
35,361
8,749
14,967
13,068
7,499
481
12,832
20,948
65,019
79,792
19,035
39,738
31,203
53,644
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
5,366
167,915
174,327
139,125
3,221
1,120
224,239
66,622
632,697
646,084
682,766
673,032
441,374
322,181
314,647
38,454
170,675
156,364
11,553
4,635
648,942
681,610
703,723
7,047
138,968
925,264
798,952
845,713
577,575
674,044
573,932
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
670,257
732,963
593,610
777,110
11,890
15,250
1,792
2,688,461
4,140,449
1,725,786
87,157
360,629
422,791
16,928
547,423
171,209
159,721
389,472
384,882
393,525
401,076
409,719
529,011
623,781
224,666
228,827
43,007
16,678
10,111
14,407
19,381
23,227
29,840
7,256
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
8,266
8,592
6,125
9,218
7,519
9,218
17,693
630,522
362,887
881,526
222,218
4,425
85,809
130,730
538,492
240,577
67,900
4,043
43,426
83,702
69,635
148,530
13,573
839
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
131,984
25,566
8,310
448,890
1,804
15,456
24,996
9,497
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
p CONSTRUCCIÓN
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2
o
UN ### 1,979,594 1,996,995 2,001,345 1,999,605 1,997,865 2,009,175 2,016,136
1.2 CAMPAMENTO 9 M2 UN ### 1,155,947 1,164,647 1,166,822 1,165,952 1,165,082 1,170,737 1,174,217
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,088 14,088 14,088 14,088 14,088 14,088 14,088
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,792 15,792 15,792 15,792 15,792 15,792 15,792
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,267 18,267 18,267 18,267 18,267 18,267 18,267
1.6 CERCA EN TABLA H=2.30 M ML ### 65,237 65,237 65,237 65,237 65,237 65,237 65,237
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 45,737 45,925 45,972 45,953 45,934 46,056 46,131
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,167 21,354 21,401 21,382 21,364 21,486 21,561
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 895,039 896,716 897,086 897,097 898,402 899,920 900,670
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,350 10,350 10,350 10,350 10,350 10,350 10,350
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,730 3,730 3,730 3,730 3,730 3,730 3,730
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,667,413 2,667,413 2,667,413 2,667,413 2,667,413 2,667,413 2,667,413
1.44 RED TELEFÓNICA PROVISIONAL UN ### 247,061 247,061 247,061 247,061 247,061 247,061 247,061
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 85,468 82,041 80,327 83,754 109,455 114,595 114,595
2.2 BASE ARENA CEMENTO 1:20 M3 ### 172,146 185,558 188,911 187,570 186,229 194,945 200,310
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,011 22,011 22,011 22,011 22,011 22,011 22,011
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 625,069 643,527 648,142 646,296 644,450 656,448 663,832
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 626,380 645,447 650,215 648,307 646,401 658,795 666,422
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 583,516 601,370 605,834 604,048 602,263 613,868 621,010
2.9 PILOTE DE MADERA D=20 CM ML ### 49,622 49,622 49,622 49,622 49,622 49,622 49,622
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM)
ML ### 153,026 153,026 153,026 153,026 153,026 153,026 153,026
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 DISTANCIA MENOR DE 5 KM) ML ### 190,676 190,676 190,676 190,676 190,676 190,676 190,676
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 DISTANCIA MENOR DE 5 KM) ML ### 236,206 236,206 236,206 236,206 236,206 236,206 236,206
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 DISTANCIA MENOR DE 5 KM)
ML ### 297,497 297,497 297,497 297,497 297,497 297,497 297,497
2.14 PILOTE HINCADO 25X25 ML ### 103,581 104,875 105,198 105,069 104,939 105,780 106,298
2.15 PILOTE HINCADO 30X30 ML ### 127,539 129,413 129,882 129,695 129,507 130,726 131,476
2.16 DADOS EN CONCRETO 3500PSI M3 ### 569,367 587,221 591,685 589,899 588,114 599,719 606,861
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 91,553 91,553 91,553 91,553 91,553 91,553 91,553
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 41,994 41,994 41,994 41,994 41,994 41,994 41,994
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 55,402 55,402 55,402 55,402 55,402 55,402 55,402
4.3 COLUMNAS 3500 PSI M3 ### 789,009 806,863 811,327 809,541 807,756 819,361 826,503
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 240,939 252,231 255,785 253,444 253,192 269,871 261,684
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI M2 ### 96,546 98,279 98,713 98,539 98,366 99,493 100,186
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 113,799 115,880 116,400 116,192 115,984 117,336 118,168
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 126,912 129,686 130,379 130,102 129,824 131,627 132,736
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 133,884 136,831 137,567 137,273 136,978 138,893 140,072
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 153,144 156,784 157,694 157,330 156,966 159,332 160,788
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 170,226 174,386 175,426 175,010 174,594 177,298 178,962
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### p 188,870 193,550 194,720 194,252 193,784 196,826 198,698
i
4.12 ENTREPISO VIGUETA PLACA M2 ### o 98,811 99,111 99,185 99,155 99,125 99,320 99,440
4.13 ESCALERA MACIZA 3500 PSI M3 ### 936,098 953,952 958,416 956,630 954,845 966,450 973,592
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 94,532 94,772 94,832 94,808 94,784 94,940 95,036
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 77,610 79,396 79,842 79,664 79,485 80,646 81,360
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 87,133 89,317 89,863 89,644 89,426 90,845 91,719
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 101,358 104,097 104,782 104,508 104,234 106,014 107,110
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 688,854 706,708 711,172 709,386 707,601 719,206 726,348
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,831 49,378 49,515 49,460 49,406 49,761 49,980
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 273,932 281,906 283,900 283,102 282,305 287,488 290,677
4.21 ACERO FIGURADO 37000 PSI KG ### 4,165 4,165 4,165 4,165 4,165 4,165 4,165
4.22 ACERO FIGURADO 60000 PSI KG ### 4,369 4,369 4,369 4,369 4,369 4,369 4,369
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,143 6,143 6,143 6,143 6,143 6,143 6,143
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 835,691 853,545 858,010 856,223 854,439 866,044 873,186
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 758,637 778,180 783,066 781,111 779,157 791,860 799,677
4.26 VIGA AÉREA 3500 PSI M3 ### 829,552 847,406 851,870 850,084 848,299 859,904 867,046
4.27 VIGA CINTA 3500 PSI M3 ### 809,469 827,323 831,787 830,001 828,216 839,821 846,963
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,019,896 1,037,750 1,042,214 1,040,428 1,038,643 1,050,248 1,057,390
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 305,389 325,303 330,282 328,290 326,299 339,243 347,209
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,212 29,660 29,772 29,727 29,682 29,974 30,153
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,585 50,033 50,145 50,100 50,056 50,347 50,526
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 34,859 34,942 34,963 34,955 34,947 35,001 35,034
5.4 ARCOS EN LADRILLO PRENSADO ML ### 163,507 163,674 163,716 163,699 163,682 163,790 163,857
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,626 44,173 44,310 44,256 44,201 44,556 44,775
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,896 27,136 27,196 27,172 27,148 27,304 27,400
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 98,195 98,528 98,611 98,578 98,545 98,761 98,895
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 89,112 90,936 91,392 91,210 91,027 92,213 92,943
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 91,183 91,183 91,183 91,183 91,183 91,183 91,183
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,515 53,515 53,515 53,515 53,515 53,515 53,515
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 87,825 87,825 87,825 87,825 87,825 87,825 87,825
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,836 51,836 51,836 51,836 51,836 51,836 51,836
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 101,774 101,774 101,774 101,774 101,774 101,774 101,774
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,132 60,132 60,132 60,132 60,132 60,132 60,132
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ###
i 113,168 113,168 113,168 113,168 113,168 113,168 113,168
p
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### i 65,829 65,829 65,829 65,829 65,829 65,829 65,829
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### o 40,354 40,521 40,563 40,547 40,530 40,639 40,706
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,491 24,574 24,595 24,587 24,579 24,633 24,667
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 52,713 52,824 52,852 52,841 52,830 52,902 52,947
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 31,736 31,791 31,805 31,800 31,794 31,831 31,853
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,328 59,440 59,468 59,457 59,446 59,518 59,563
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 35,717 35,773 35,787 35,781 35,776 35,812 35,834
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 97,953 98,511 98,650 98,594 98,539 98,901 99,125
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,055 58,334 58,404 58,376 58,348 58,530 58,641
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,073 37,185 37,212 37,201 37,190 37,263 37,307
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,517 22,573 22,587 22,581 22,576 22,612 22,634
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 73,706 73,929 73,985 73,962 73,940 74,085 74,174
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,514 44,626 44,654 44,642 44,631 44,704 44,748
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 87,583 87,823 87,883 87,859 87,835 87,991 88,087
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,130 53,250 53,280 53,268 53,256 53,334 53,382
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 180,171 180,953 181,148 181,070 180,992 181,500 181,812
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 108,480 108,870 108,968 108,929 108,890 109,144 109,300
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 89,573 90,074 90,199 90,149 90,099 90,424 90,624
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,125 54,375 54,438 54,413 54,388 54,551 54,651
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 46,388 46,638 46,700 46,675 46,650 46,813 46,913
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,293 28,417 28,449 28,436 28,424 28,505 28,555
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,569 33,681 33,709 33,698 33,687 33,759 33,804
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,490 20,546 20,560 20,555 20,549 20,585 20,608
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 50,568 50,791 50,847 50,825 50,802 50,947 51,037
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,065 31,177 31,204 31,193 31,182 31,255 31,299
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 97,683 98,017 98,101 98,068 98,034 98,252 98,386
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 59,589 59,757 59,799 59,782 59,765 59,874 59,941
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 71,384 71,607 71,663 71,641 71,619 71,764 71,853
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,173 43,284 43,312 43,301 43,290 43,363 43,407
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 149,494 150,275 150,471 150,393 150,314 150,822 151,135
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 91,137 91,528 91,626 91,587 91,548 91,802 91,958
5.47 REMATES LADRILLO PRENSADO ML ### 31,589 31,672 31,693 31,685 31,676 31,730 31,764
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,316 36,676 36,766 36,730 36,694 36,928 37,072
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,359 61,839 61,959 61,911 61,863 62,175 62,367
5.50 LAVADA DE FACHADA M2 ### 5,245 5,245 5,245 5,245 5,245 5,245 5,245
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,946 50,394 50,506 50,461 50,416 50,708 50,887
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
5.52 DOVELA, GROUTING 3000 PSI ML ###
i 10,600 10,600 10,600 10,600 10,600 10,600 10,600
p
5.53 ANCLAJE 3/8" L=30CM UN ### i 13,962 13,962 13,962 13,962 13,962 13,962 13,962
5.54 ANCLAJE 1/2" L=50CM UN ### o 18,232 18,232 18,232 18,232 18,232 18,232 18,232
5.55 ANCLAJE 5/8" L=70CM UN ### 25,448 25,448 25,448 25,448 25,448 25,448 25,448
5.56 ANCLAJE 3/4" L=70CM UN ### 37,847 37,847 37,847 37,847 37,847 37,847 37,847
5.57 ANCLAJE 1" L= 70CM UN ### 4,811 4,945 4,978 4,965 4,952 5,039 5,092
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 149,274 149,274 149,274 149,274 149,274 149,274 149,274
7.29 TEJA SIN TRASLAPO M2 ### 67,210 67,210 67,210 67,210 67,210 67,210 67,210
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,592 42,592 42,592 42,592 42,592 42,592 42,592
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,300 33,300 33,300 33,300 33,300 33,300 33,300
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 57,762 57,762 57,762 57,762 57,762 57,762 57,762
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,046 20,046 20,046 20,046 20,046 20,046 20,046
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ###
i 24,053 24,053 24,053 24,053 24,053 24,053 24,053
p
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### i 26,014 26,014 26,014 26,014 26,014 26,014 26,014
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### o 33,410 33,410 33,410 33,410 33,410 33,410 33,410
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,134 22,134 22,134 22,134 22,134 22,134 22,134
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,069 52,069 52,069 52,069 52,069 52,069 52,069
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 353,091 353,091 353,091 353,091 353,091 353,091 353,091
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 409,169 409,169 409,169 409,169 409,169 409,169 409,169
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 269,418 269,418 269,418 269,418 269,418 269,418 269,418
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 287,538 287,538 287,538 287,538 287,538 287,538 287,538
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 435,191 453,938 458,625 456,750 454,876 467,061 474,560
8.2 CONCRETO 3500 PSI M3 ### 380,074 397,408 401,742 400,008 398,275 409,542 416,476
8.3 CONCRETO 3000 PSI M3 ### 378,274 396,195 400,675 398,883 397,091 408,739 415,908
8.4 CONCRETO 2500 PSI M3 ### 333,277 351,518 356,078 354,254 352,430 364,286 371,583
8.5 CONCRETO 2000 PSI M3 ### 310,372 329,133 333,823 331,947 330,071 342,265 349,770
8.6 CONCRETO 1500 PSI M3 ### 281,383 300,717 305,551 303,617 301,684 314,251 321,985
8.7 MORTERO SECO 1:10 M3 ### 218,031 229,527 232,401 231,252 230,102 237,574 242,172
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 428,616 439,778 442,569 441,453 440,336 447,591 452,056
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 412,285 428,965 433,135 431,467 429,799 440,641 447,313
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 472,925 488,525 492,425 490,865 489,305 499,445 505,685
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 696,845 712,445 716,345 714,785 713,225 723,365 729,605
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 122,736 122,736 122,736 122,736 122,736 122,736 122,736
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,817 3,901 3,922 3,913 3,905 3,959 3,992
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 137,566 137,566 137,566 137,566 137,566 137,566 137,566
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 168,219 168,219 168,219 168,219 168,219 168,219 168,219
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 243,574 243,574 243,574 243,574 243,574 243,574 243,574
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 271,046 271,046 271,046 271,046 271,046 271,046 271,046
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 298,550 298,550 298,550 298,550 298,550 298,550 298,550
9.8 HOJA PUERTA FORTEC 0.81 UN ### 198,132 198,132 198,132 198,132 198,132 198,132 198,132
9.9 HOJA PUERTA FORTEC 0.91 UN ### 224,575 224,575 224,575 224,575 224,575 224,575 224,575
9.10 HOJA PUERTA FORTEC 1.50 UN ### 330,346 330,346 330,346 330,346 330,346 330,346 330,346
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 125,414 125,414 125,414 125,414 125,414 125,414 125,414
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 166,401 166,401 166,401 166,401 166,401 166,401 166,401
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 184,911 184,911 184,911 184,911 184,911 184,911 184,911
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ###
i 470,494 470,494 470,494 470,494 470,494 470,494 470,494
p
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### i 42,014 42,014 42,014 42,014 42,014 42,014 42,014
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### o 26,297 26,297 26,297 26,297 26,297 26,297 26,297
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 99,346 99,346 99,346 99,346 99,346 99,346 99,346
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 120,444 120,444 120,444 120,444 120,444 120,444 120,444
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,604 93,604 93,604 93,604 93,604 93,604 93,604
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,136 29,136 29,136 29,136 29,136 29,136 29,136
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,136 29,136 29,136 29,136 29,136 29,136 29,136
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,629 27,629 27,629 27,629 27,629 27,629 27,629
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,302 42,302 42,302 42,302 42,302 42,302 42,302
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,317 52,317 52,317 52,317 52,317 52,317 52,317
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,001 63,001 63,001 63,001 63,001 63,001 63,001
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,687 75,687 75,687 75,687 75,687 75,687 75,687
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 355,631 355,631 355,631 355,631 355,631 355,631 355,631
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 248,802 248,802 248,802 248,802 248,802 248,802 248,802
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,622 33,622 33,622 33,622 33,622 33,622 33,622
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 42,970 42,970 42,970 42,970 42,970 42,970 42,970
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,317 52,317 52,317 52,317 52,317 52,317 52,317
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,672 65,672 65,672 65,672 65,672 65,672 65,672
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 75,873 75,873 75,873 75,873 75,873 75,873 75,873
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 210,157 210,157 210,157 210,157 210,157 210,157 210,157
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO) ML ### 80,468 80,468 80,468 80,468 80,468 80,468 80,468
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,502 144,502 144,502 144,502 144,502 144,502 144,502
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 136,277 136,277 136,277 136,277 136,277 136,277 136,277
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,483 89,483 89,483 89,483 89,483 89,483 89,483
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 210,628 210,628 210,628 210,628 210,628 210,628 210,628
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 109,871 109,871 109,871 109,871 109,871 109,871 109,871
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,601 6,601 6,601 6,601 6,601 6,601 6,601
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 99,743 99,743 99,743 99,743 99,743 99,743 99,743
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H:
10,10(1) 2.00 MTS
M2 ### 120,530 120,530 120,530 120,530 120,530 120,530 120,530
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,054 41,054 41,054 41,054 41,054 41,054 41,054
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 535,497 535,497 535,497 535,497 535,497 535,497 535,497
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ###
i 192,886 192,886 192,886 192,886 192,886 192,886 192,886
p
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### i 217,016 217,016 217,016 217,016 217,016 217,016 217,016
o
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
10.15 PUERTAS Y ACCESORIOS) M2 ### 488,603 488,603 488,603 488,603 488,603 488,603 488,603
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 128,544 128,544 128,544 128,544 128,544 128,544 128,544
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 390,356 390,356 390,356 390,356 390,356 390,356 390,356
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,027 6,027 6,027 6,027 6,027 6,027 6,027
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 274,896 274,896 274,896 274,896 274,896 274,896 274,896
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 122,260 122,260 122,260 122,260 122,260 122,260 122,260
10.21 REJILLA PISO 0.30 M M2 ### 85,960 85,960 85,960 85,960 85,960 85,960 85,960
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 88,817 88,817 88,817 88,817 88,817 88,817 88,817
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,589 10,589 10,589 10,589 10,589 10,589 10,589
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,735 11,735 11,735 11,735 11,735 11,735 11,735
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,152 4,152 4,152 4,152 4,152 4,152 4,152
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,535 6,535 6,535 6,535 6,535 6,535 6,535
11.59 GABINETE TIPO III UN ### 1,010,813 1,010,813 1,010,813 1,010,813 1,010,813 1,010,813 1,010,813
11.60 GABINETE TIPO I UN ### 773,091 773,091 773,091 773,091 773,091 773,091 773,091
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,589,429 2,589,429 2,589,429 2,589,429 2,589,429 2,589,429 2,589,429
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,159,383 2,159,383 2,159,383 2,159,383 2,159,383 2,159,383 2,159,383
11.63 VÁLVULA MARIPOSA 3" UN ### 629,188 629,188 629,188 629,188 629,188 629,188 629,188
11.64 VÁLVULA MARIPOSA 4" UN ### 813,231 813,231 813,231 813,231 813,231 813,231 813,231
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 312,125 312,125 312,125 312,125 312,125 312,125 312,125
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 362,010 362,010 362,010 362,010 362,010 362,010 362,010
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 57,515 57,515 57,515 57,515 57,515 57,515 57,515
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 68,043 68,043 68,043 68,043 68,043 68,043 68,043
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 75,599 75,599 75,599 75,599 75,599 75,599 75,599
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 88,985 88,985 88,985 88,985 88,985 88,985 88,985
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,094 54,094 54,094 54,094 54,094 54,094 54,094
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,641 61,641 61,641 61,641 61,641 61,641 61,641
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
12.8 STRIP TELEFÓNICO 10 PARES UN ###
i 142,598 142,598 142,598 142,598 142,598 142,598 142,598
p
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### i 55,532 55,532 55,532 55,532 55,532 55,532 55,532
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### o 127,555 127,555 127,555 127,555 127,555 127,555 127,555
12.11 SALIDA T.V PVC COMPLETA. UN ### 76,332 76,332 76,332 76,332 76,332 76,332 76,332
12.12 SALIDA BIFÁSICA C.N. UN ### 45,257 45,257 45,257 45,257 45,257 45,257 45,257
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,522 95,522 95,522 95,522 95,522 95,522 95,522
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 407,996 407,996 407,996 407,996 407,996 407,996 407,996
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 543,161 543,161 543,161 543,161 543,161 543,161 543,161
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,516 3,516 3,516 3,516 3,516 3,516 3,516
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,644 4,644 4,644 4,644 4,644 4,644 4,644
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,221 7,221 7,221 7,221 7,221 7,221 7,221
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,920 12,920 12,920 12,920 12,920 12,920 12,920
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 271,336 271,336 271,336 271,336 271,336 271,336 271,336
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,760 76,760 76,760 76,760 76,760 76,760 76,760
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 103,755 103,755 103,755 103,755 103,755 103,755 103,755
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,606 42,606 42,606 42,606 42,606 42,606 42,606
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,393,269 1,393,269 1,393,269 1,393,269 1,393,269 1,393,269 1,393,269
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,032,687 1,032,687 1,032,687 1,032,687 1,032,687 1,032,687 1,032,687
12.26 POSTE METÁLICO 6M UN ### 1,286,640 1,286,640 1,286,640 1,286,640 1,286,640 1,286,640 1,286,640
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 597,865 597,865 597,865 597,865 597,865 597,865 597,865
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 109,495 109,495 109,495 109,495 109,495 109,495 109,495
12.29 LUMINARIA 70W SODIO UN ### 501,512 501,512 501,512 501,512 501,512 501,512 501,512
12.30 LUMINARIA 150W SODIO UN ### 627,282 627,282 627,282 627,282 627,282 627,282 627,282
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,655,849 1,655,849 1,655,849 1,655,849 1,655,849 1,655,849 1,655,849
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,219,541 1,219,541 1,219,541 1,219,541 1,219,541 1,219,541 1,219,541
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 39,704 40,304 40,454 40,394 40,334 40,724 40,964
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,311 39,911 40,061 40,001 39,941 40,331 40,571
13.3 ALISTADO PARA LISTÓN M2 ### 14,755 14,875 14,905 14,893 14,881 14,959 15,007
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 27,933 29,133 29,433 29,313 29,193 29,973 30,453
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 84,656 85,856 86,156 86,036 85,916 86,696 87,176
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,455 26,830 26,924 26,887 26,849 27,093 27,243
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 56,057 57,881 58,337 58,155 57,972 59,158 59,888
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 77,268 80,186 80,916 80,624 80,332 82,229 83,397
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,365 30,365 30,365 30,365 30,365 30,365 30,365
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,071 23,071 23,071 23,071 23,071 23,071 23,071
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
13.11 PERMA PLY 2 CAPAS M2 ###
i 27,110 27,110 27,110 27,110 27,110 27,110 27,110
p
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### i 45,454 47,096 47,506 47,342 47,178 48,245 48,902
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### o 53,161 55,168 55,669 55,469 55,268 56,572 57,375
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 76,818 79,919 80,695 80,385 80,074 82,090 83,330
13.15 TRITURADO FINO 1/2 M3 ### 90,319 104,053 107,487 106,113 104,740 113,667 119,161
13.16 TRITURADO GRUESO 3/4 M3 ### 94,357 105,295 107,831 107,453 112,250 121,071 125,764
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,326 57,566 57,626 57,602 57,578 57,734 57,830
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,334 34,454 34,484 34,472 34,460 34,538 34,586
14.3 ADOQUÍN CONCRETO 6CM M2 ### 65,497 66,097 66,247 66,187 66,127 66,517 66,757
14.4 ADOQUÍN CONCRETO 8CM M2 ### 68,797 69,397 69,547 69,487 69,427 69,817 70,057
14.5 ADOQUÍN GRES PEATONAL M2 ### 73,077 73,677 73,827 73,767 73,707 74,097 74,337
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO M2 ### 75,438 75,678 75,738 75,714 75,690 75,846 75,942
14.7 GRAVILLA PARA GRADAS ML ### 37,503 37,750 37,812 37,788 37,763 37,924 38,023
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 164,045 165,125 165,395 165,287 165,179 165,881 166,313
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 46,617 47,232 47,386 47,325 47,263 47,663 47,909
14.10 GUARDAESCOBA EN GRANITO ML ### 44,198 44,198 44,198 44,198 44,198 44,198 44,198
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,189 10,437 10,498 10,474 10,449 10,610 10,709
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,385 9,385 9,385 9,385 9,385 9,385 9,385
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,587 12,587 12,587 12,587 12,587 12,587 12,587
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,588 10,588 10,588 10,588 10,588 10,588 10,588
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,668 17,668 17,668 17,668 17,668 17,668 17,668
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,327 34,327 34,327 34,327 34,327 34,327 34,327
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,333 9,333 9,333 9,333 9,333 9,333 9,333
14.18 LISTÓN M.H. AMARILLO M2 ### 74,724 74,724 74,724 74,724 74,724 74,724 74,724
14.19 PASO ESCALERA GRANITO ML ### 119,133 119,973 120,183 120,099 120,015 120,561 120,897
14.20 PIRLANES ALUMINIO ML ### 7,646 7,646 7,646 7,646 7,646 7,646 7,646
14.21 PIRLANES LADRILLO ML ### 31,985 32,151 32,193 32,176 32,160 32,268 32,334
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 45,983 45,983 45,983 45,983 45,983 45,983 45,983
14.23 PISO VINILO TRÁFICO PESADO M2 ### 53,393 53,393 53,393 53,393 53,393 53,393 53,393
14.24 PULIDA LACADA PISO MADERA M2 ### 49,479 49,479 49,479 49,479 49,479 49,479 49,479
14.25 TABLETA DE GRES 25X25 M2 ### 49,754 49,994 50,054 50,030 50,006 50,162 50,258
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 55,801 56,041 56,101 56,077 56,053 56,209 56,305
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,054 11,054 11,054 11,054 11,054 11,054 11,054
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 49,331 49,581 49,644 49,619 49,594 49,756 49,856
14.29 JABONERA PORCELANA ACUARIO UN ### 20,671 20,671 20,671 20,671 20,671 20,671 20,671
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE)
UN ### p 123,526 123,526 123,526 123,526 123,526 123,526 123,526
i
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### o 10,052 10,052 10,052 10,052 10,052 10,052 10,052
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,590 22,590 22,590 22,590 22,590 22,590 22,590
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,548 14,548 14,548 14,548 14,548 14,548 14,548
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,138 14,138 14,138 14,138 14,138 14,138 14,138
14.35 REMATES BOCEL ALUMINIO ML ### 8,651 8,651 8,651 8,651 8,651 8,651 8,651
14.36 REMATES BOCEL PORCELANA ML ### 8,801 8,801 8,801 8,801 8,801 8,801 8,801
14.37 TAPA REGISTRO 20X20 UN ### 19,162 19,162 19,162 19,162 19,162 19,162 19,162
14.38 TAPA REGISTRO 6X6 UN ### 17,476 17,476 17,476 17,476 17,476 17,476 17,476
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,642 18,642 18,642 18,642 18,642 18,642 18,642
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO M2 ### 21,551 21,551 21,551 21,551 21,551 21,551 21,551
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 65,393 65,633 65,693 65,669 65,645 65,801 65,897
14.42 MEDIA CAÑA EN GRANITO ML ### 77,468 77,468 77,468 77,468 77,468 77,468 77,468
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,601 34,601 34,601 34,601 34,601 34,601 34,601
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,345 13,345 13,345 13,345 13,345 13,345 13,345
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 101,598 101,598 101,598 101,598 101,598 101,598 101,598
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 123,110 123,110 123,110 123,110 123,110 123,110 123,110
15 CIELO RASO
15.1 APLIQUE YESO ML ### 72,806 72,806 72,806 72,806 72,806 72,806 72,806
15.2 ARMADURA MADERA Y MALLA M2 ### 36,314 36,314 36,314 36,314 36,314 36,314 36,314
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 55,738 55,738 55,738 55,738 55,738 55,738 55,738
15.4 CIELO RASO DURACUSTIC M2 ### 68,287 68,287 68,287 68,287 68,287 68,287 68,287
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,011 51,011 51,011 51,011 51,011 51,011 51,011
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 94,378 94,378 94,378 94,378 94,378 94,378 94,378
15.7 CORNISAS YESO ML ### 48,840 48,840 48,840 48,840 48,840 48,840 48,840
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 104,217 104,217 104,217 104,217 104,217 104,217 104,217
15.9 MALLA CON VENA M2 ### 13,583 13,583 13,583 13,583 13,583 13,583 13,583
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 43,707 43,707 43,707 43,707 43,707 43,707 43,707
i
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 M3 ### o 49,987 49,987 49,987 49,987 49,987 49,987 49,987
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 76,028 72,602 70,888 74,315 100,016 105,156 105,156
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 93,018 107,054 110,563 109,159 107,755 116,879 122,493
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 144,687 144,687 144,687 182,381 144,687 144,687 182,381
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 75,374 71,947 70,233 73,660 99,361 104,501 104,501
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 135,927 135,927 135,927 173,622 135,927 135,927 173,622
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 141,656 141,656 141,656 179,351 141,656 141,656 179,351
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 302,096 302,096 302,096 302,096 302,096 302,096 302,096
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 GRIFERÍA) UN ### 888,820 888,820 888,820 888,820 888,820 888,820 888,820
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 481,963 481,963 481,963 481,963 481,963 481,963 481,963
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 140,487 140,487 140,487 140,487 140,487 140,487 140,487
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 196,192 196,192 196,192 196,192 196,192 196,192 196,192
SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
17.6 GRIFERÍA) UN ### 182,270 182,270 182,270 182,270 182,270 182,270 182,270
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 400,122 400,122 400,122 400,122 400,122 400,122 400,122
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
17.8 GRIFERÍA) UN ### 1,022,014 1,022,014 1,022,014 1,022,014 1,022,014 1,022,014 1,022,014
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 290,913 290,913 290,913 290,913 290,913 290,913 290,913
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 206,462 206,462 206,462 206,462 206,462 206,462 206,462
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,675 82,675 82,675 82,675 82,675 82,675 82,675
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 249,662 249,662 249,662 249,662 249,662 249,662 249,662
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 367,333 367,333 367,333 367,333 367,333 367,333 367,333
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
18 PINTURAS
i
p
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### i 8,382 8,382 8,382 8,382 8,382 8,382 8,382
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### o 3,100 3,100 3,100 3,100 3,100 3,100 3,100
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,198 11,198 11,198 11,198 11,198 11,198 11,198
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,377 42,377 42,377 42,377 42,377 42,377 42,377
18.5 CARBURO SOBRE PAÑETES M2 ### 5,868 5,868 5,868 5,868 5,868 5,868 5,868
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 65,580 65,580 65,580 65,580 65,580 65,580 65,580
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,495 3,495 3,495 3,495 3,495 3,495 3,495
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,785 2,785 2,785 2,785 2,785 2,785 2,785
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,003 14,003 14,003 14,003 14,003 14,003 14,003
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,052 4,052 4,052 4,052 4,052 4,052 4,052
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,763 14,763 14,763 14,763 14,763 14,763 14,763
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,750 5,750 5,750 5,750 5,750 5,750 5,750
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,549 6,549 6,549 6,549 6,549 6,549 6,549
18.14 ESTUCO M2 ### 7,066 7,066 7,066 7,066 7,066 7,066 7,066
18.15 ESTUCO (LINEAL) ML ### 4,428 4,428 4,428 4,428 4,428 4,428 4,428
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,595 15,595 15,595 15,595 15,595 15,595 15,595
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,676 9,676 9,676 9,676 9,676 9,676 9,676
18.18 LACA PISOS MADERA M2 ### 22,909 22,909 22,909 22,909 22,909 22,909 22,909
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,701 2,701 2,701 2,701 2,701 2,701 2,701
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,192 12,192 12,192 12,192 12,192 12,192 12,192
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,291 3,291 3,291 3,291 3,291 3,291 3,291
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,649 12,649 12,649 12,649 12,649 12,649 12,649
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,117 7,117 7,117 7,117 7,117 7,117 7,117
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,479 4,479 4,479 4,479 4,479 4,479 4,479
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,851 21,851 21,851 21,851 21,851 21,851 21,851
18.26 PINTURA EPÓXICA M2 ### 12,751 12,751 12,751 12,751 12,751 12,751 12,751
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,885 7,885 7,885 7,885 7,885 7,885 7,885
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,047,507 6,047,507 6,047,507 6,047,507 6,047,507 6,047,507 6,047,507
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES
19.2 Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,685,026 10,685,026 10,685,026 10,685,026 10,685,026 10,685,026 10,685,026
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,796,384 2,796,384 2,796,384 2,796,384 2,796,384 2,796,384 2,796,384
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,138,531 9,138,531 9,138,531 9,138,531 9,138,531 9,138,531 9,138,531
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,557,471 8,557,471 8,557,471 8,557,471 8,557,471 8,557,471 8,557,471
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,701 2,701 2,701 2,701 2,701 2,701 2,701
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 858,721 858,721 858,721 858,721 858,721 858,721 858,721
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ###
i 85,733 85,733 85,733 85,733 85,733 85,733 85,733
p
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### i 1,553,050 1,553,238 1,553,284 1,553,266 1,553,247 1,553,369 1,553,444
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### o 671,611 676,092 677,212 676,764 676,316 679,228 681,020
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,377 21,377 21,377 21,377 21,377 21,377 21,377
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,132 29,132 29,132 29,132 29,132 29,132 29,132
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,155 26,155 26,155 26,155 26,155 26,155 26,155
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,570 27,570 27,570 27,570 27,570 27,570 27,570
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,459 34,459 34,459 34,459 34,459 34,459 34,459
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,624 17,624 17,624 17,624 17,624 17,624 17,624
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,092 23,092 23,092 23,092 23,092 23,092 23,092
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,497 35,497 35,497 35,497 35,497 35,497 35,497
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 271,925 271,925 271,925 271,925 271,925 271,925 271,925
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 312,927 312,927 312,927 312,927 312,927 312,927 312,927
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 326,412 326,412 326,412 326,412 326,412 326,412 326,412
20.16 ACOMETIDA GAS 1/2" ML ### 302,948 302,948 302,948 302,948 302,948 302,948 302,948
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 113,711 113,711 113,711 113,711 113,711 113,711 113,711
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,184,788 1,184,788 1,184,788 1,184,788 1,184,788 1,184,788 1,184,788
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 148,576 148,576 148,576 148,576 148,576 148,576 148,576
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,372,268 1,372,268 1,372,268 1,372,268 1,372,268 1,372,268 1,372,268
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 956,522 956,522 956,522 956,522 956,522 956,522 956,522
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,536 62,536 62,536 62,536 62,536 62,536 62,536
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 112,880 112,880 112,880 112,880 112,880 112,880 112,880
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 266,458 266,458 266,458 266,458 266,458 266,458 266,458
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 266,452 266,452 266,452 266,452 266,452 266,452 266,452
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 427,740 427,740 427,740 427,740 427,740 427,740 427,740
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 112,928 112,928 112,928 112,928 112,928 112,928 112,928
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 112,928 112,928 112,928 112,928 112,928 112,928 112,928
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 266,458 266,458 266,458 266,458 266,458 266,458 266,458
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 266,458 266,458 266,458 266,458 266,458 266,458 266,458
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 427,740 427,740 427,740 427,740 427,740 427,740 427,740
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 430,333 430,333 430,333 430,333 430,333 430,333 430,333
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 698,145 698,145 698,145 698,145 698,145 698,145 698,145
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,120,274 1,120,274 1,120,274 1,120,274 1,120,274 1,120,274 1,120,274
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 69,240 69,240 69,240 69,240 69,240 69,240 69,240
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 360,259 360,259 360,259 360,259 360,259 360,259 360,259
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 403,123 403,123 403,123 403,123 403,123 403,123 403,123
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,116,159 1,116,159 1,116,159 1,116,159 1,116,159 1,116,159 1,116,159
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 65,101 65,212 65,240 65,229 65,218 65,290 65,335
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 326,679 326,679 326,679 326,679 326,679 326,679 326,679
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 49,653 49,653 49,653 49,653 49,653 49,653 49,653
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 70,190 70,190 70,190 70,190 70,190 70,190 70,190
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 101,252 101,252 101,252 101,252 101,252 101,252 101,252
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 155,407 155,407 155,407 155,407 155,407 155,407 155,407
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 249,691 249,691 249,691 249,691 249,691 249,691 249,691
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 362,768 362,768 362,768 362,768 362,768 362,768 362,768
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 458,931 458,931 458,931 458,931 458,931 458,931 458,931
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 603,367 603,367 603,367 603,367 603,367 603,367 603,367
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 829,628 829,628 829,628 829,628 829,628 829,628 829,628
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 71,612 72,195 72,341 72,283 72,224 72,603 72,837
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 84,976 85,559 85,705 85,647 85,588 85,967 86,201
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 53,957 55,872 56,351 56,159 55,968 57,213 57,979
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###
i 58,681 60,563 61,034 60,845 60,657 61,880 62,633
p
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### i 58,870 60,691 61,146 60,964 60,782 61,965 62,693
5.6 BORDE SEPARADOR VERDE A-170 ML ### o 251,062 251,374 251,452 251,420 251,389 251,592 251,717
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,186 18,415 18,473 18,450 18,427 18,576 18,668
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 38,649 39,999 40,336 40,201 40,066 40,943 41,483
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 82,699 82,865 82,907 82,890 82,874 82,982 83,049
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 550,514 554,754 555,814 555,390 554,966 557,722 559,418
5.11 LOSETA PREFABRICADA A-40 M2 ### 61,886 62,600 62,778 62,707 62,635 63,100 63,385
5.12 LOSETA PREFABRICADA A-60 M2 ### 89,665 90,379 90,557 90,486 90,414 90,878 91,164
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 32,590 33,343 33,531 33,456 33,381 33,870 34,171
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 52,124 53,648 54,029 53,876 53,724 54,714 55,323
5.15 SARDINEL PREFABRICADO A-10 ML ### 96,982 97,149 97,190 101,552 97,157 97,266 101,710
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 59,649 60,081 60,189 60,146 60,102 60,383 60,556
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 200,343 201,239 201,463 201,373 201,284 201,866 202,225
6.2 BANCA EN CONCRETO M-30 UN ### 658,308 659,563 659,876 659,751 659,625 660,441 660,942
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 212,584 212,771 212,818 212,799 212,781 212,902 212,977
6.4 BOLARDO M-60 CONCRETO UN ### 159,740 160,816 161,084 160,977 160,869 161,568 161,998
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 161,608 162,683 162,952 162,844 162,737 163,436 163,866
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 189,407 190,533 190,814 190,702 190,589 191,321 191,771
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 57,569 58,015 58,127 58,082 58,038 58,328 58,506
6.8 BORDILLO PREFABRICADO A-80 ML ### 66,310 66,810 66,935 66,885 66,835 67,160 67,360
6.9 CANECA M-120 UN ### 308,096 308,207 308,235 308,224 308,213 308,286 308,330
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 812,887 813,425 813,559 813,506 813,452 813,801 814,016
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,333,795 3,334,153 3,334,243 3,334,207 3,334,171 3,334,404 3,334,548
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,429,497 3,429,855 3,429,945 3,429,909 3,429,873 3,430,106 3,430,250
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 479,398 479,773 479,867 479,829 479,792 480,035 480,186
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 634,313 635,814 636,189 636,039 635,889 636,864 637,465
6.15 BANCA EN MADERA M-50 UN ### 528,019 528,019 528,019 528,019 528,019 528,019 528,019
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 245,034 245,571 245,706 245,652 245,598 245,948 246,163
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 567,589 567,868 567,938 567,910 567,882 568,063 568,175
6.18 POSTE HISTÓRICO M-131 UN ### 6,335,674 6,338,362 6,339,034 6,338,765 6,338,496 6,340,243 6,341,319
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,984 3,984 3,984 3,984 3,984 3,984 3,984
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ###
i 42,924 42,924 42,924 42,924 42,924 42,924 42,924
p
7.3 SEÑAL DOBLE DE CICLORUTA UN ### i 309,753 309,909 309,948 309,932 309,916 310,018 310,080
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### o 487,812 488,562 488,750 488,675 488,600 489,087 489,388
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 232,451 232,607 232,646 232,630 232,615 232,716 232,778
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 246,810 246,966 247,005 246,989 246,974 247,075 247,137
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 257,683 257,839 257,878 257,862 257,847 257,948 258,010
7.8 TACHAS REFLECTIVAS UN ### 13,402 13,402 13,402 13,402 13,402 13,402 13,402
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,309 14,309 14,309 14,309 14,309 14,309 14,309
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 116,278 116,278 116,278 116,278 116,278 116,278 116,278
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,227 14,227 14,227 14,227 14,227 14,227 14,227
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,128 19,128 19,128 19,128 19,128 19,128 19,128
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 22,917 22,917 22,917 22,917 22,917 22,917 22,917
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 29,432 29,432 29,432 29,432 29,432 29,432 29,432
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,
4.40 *** FILTRO Y SEPARACIÓN) M2 ### 7,175 7,175 7,175 7,175 7,175 7,175 7,175
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890 448,890 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,277 15,277 15,277 15,277 15,277 15,277 15,277
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,676 24,676 24,676 24,676 24,676 24,676 24,676
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,418 9,418 9,418 9,418 9,418 9,418 9,418
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
E BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 2,228,288 2,265,345 2,191,230 2,254,365 2,233,778
1.2 CAMPAMENTO 9 M2 UN ### 1,287,558 1,306,087 1,269,029 1,300,597 1,290,303
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,900 14,900 14,900 14,900 14,900
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,711 16,711 16,711 16,711 16,711
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,286 19,286 19,286 19,286 19,286
1.6 CERCA EN TABLA H=2.30 M ML ### 71,697 71,697 71,697 71,697 71,697
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 50,967 51,367 50,567 51,249 51,026
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 23,772 24,173 23,372 24,054 23,832
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 996,064 999,351 993,071 999,170 995,652
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 11,281 11,281 11,281 11,281 11,281
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 4,094 4,094 4,094 4,094 4,094
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,954,012 2,954,012 2,954,012 2,954,012 2,954,012
1.44 RED TELEFÓNICA PROVISIONAL UN ### 270,723 270,723 270,723 270,723 270,723
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 154,036 168,282 147,183 143,756 130,049
2.2 BASE ARENA CEMENTO 1:20 M3 ### 248,108 276,363 219,852 267,991 252,294
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 24,180 24,180 24,180 24,180 24,180
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 757,026 796,388 717,664 784,726 762,858
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 760,435 801,130 719,740 789,073 766,464
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 706,882 744,987 668,777 733,697 712,528
2.9 PILOTE DE MADERA D=20 CM ML ### 50,706 50,706 50,706 50,706 50,706
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.10 MENOR DE 5 KM)
ML ### 156,545 156,545 156,545 156,545 156,545
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.11 MENOR DE 5 KM) ML ### 198,517 198,517 198,517 198,517 198,517
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 MENOR DE 5 KM) ML ### 249,275 249,275 249,275 249,275 249,275
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.13 MENOR DE 5 KM) ML ### 317,602 317,602 317,602 317,602 317,602
2.14 PILOTE HINCADO 25X25 ML ### 115,072 117,836 112,308 117,017 115,482
2.15 PILOTE HINCADO 30X30 ML ### 144,193 148,199 140,187 147,012 144,786
2.16 DADOS EN CONCRETO 3500PSI M3 ### 692,733 730,838 654,627 719,548 698,379
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.17 KM) ML ### 93,867 93,867 93,867 93,867 93,867
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 2,037,135 2,082,279 1,991,991 2,068,903 2,043,823
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 45,984 45,984 45,984 45,984 45,984
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 61,030 61,030 61,030 61,030 61,030
4.3 COLUMNAS 3500 PSI M3 ### 923,859 961,964 885,753 950,674 929,504
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 314,826 345,735 290,186 332,785 318,167
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI M2 ### 113,581 117,281 109,882 116,185 114,129
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI M2 ### 134,372 138,811 129,932 137,496 135,029
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 148,408 154,328 142,489 152,574 149,285
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 156,707 162,996 150,418 161,133 157,639
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 180,916 188,685 173,147 186,383 182,067
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 201,803 210,681 192,924 208,051 203,118
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 224,204 234,192 214,215 231,233 225,684
4.12 ENTREPISO VIGUETA PLACA M2 ### 109,112 109,753 108,470 109,563 109,207
4.13 ESCALERA MACIZA 3500 PSI M3 ### 1,085,696 1,123,800 1,047,590 1,112,511 1,091,341
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 105,279 105,798 104,761 105,644 105,356
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ###
i 91,304 95,115 87,494 93,986 91,869
p
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### i 103,537 108,199 98,876 106,818 104,228
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### o 121,535 127,380 115,689 125,648 122,401
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 815,864 853,969 777,758 842,679 821,510
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 53,663 54,832 52,494 54,486 53,836
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 328,997 346,014 311,978 340,972 331,518
4.21 ACERO FIGURADO 37000 PSI KG ### 4,602 4,602 4,602 4,602 4,602
4.22 ACERO FIGURADO 60000 PSI KG ### 4,827 4,827 4,827 4,827 4,827
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,608 6,608 6,608 6,608 6,608
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 965,731 1,003,836 927,625 992,546 971,377
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 895,476 937,184 853,767 924,826 901,655
4.26 VIGA AÉREA 3500 PSI M3 ### 961,059 999,163 922,953 987,874 966,704
4.27 VIGA CINTA 3500 PSI M3 ### 941,029 979,134 902,923 967,844 946,675
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,152,618 1,190,723 1,114,513 1,179,433 1,158,264
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 423,169 465,579 380,759 453,013 429,452
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 32,457 33,412 31,502 33,129 32,598
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 52,978 53,933 52,023 53,650 53,120
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 37,018 37,193 36,842 37,141 37,044
5.4 ARCOS EN LADRILLO PRENSADO ML ### 172,785 173,136 172,434 173,032 172,837
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 48,376 49,545 47,206 49,198 48,549
5.6 DINTELES EN BLOQUE 0.15 M ML ### 29,643 30,161 29,125 30,008 29,720
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 108,970 109,672 108,268 109,464 109,074
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 104,719 108,617 100,821 107,462 105,296
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 98,182 98,182 98,182 98,182 98,182
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 57,015 57,015 57,015 57,015 57,015
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 94,414 94,414 94,414 94,414 94,414
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 55,131 55,131 55,131 55,131 55,131
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 110,441 110,441 110,441 110,441 110,441
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 64,465 64,465 64,465 64,465 64,465
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 123,228 123,228 123,228 123,228 123,228
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 70,859 70,859 70,859 70,859 70,859
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 44,121 44,474 43,768 44,369 44,173
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 26,374 26,551 26,198 26,498 26,400
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 57,885 58,120 57,650 58,050 57,920
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 34,322 34,439 34,204 34,404 34,339
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ###
i 65,031 65,267 64,796 65,197 65,066
p
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### i 38,568 38,686 38,451 38,651 38,586
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### o 108,874 110,050 107,698 109,701 109,048
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 63,516 64,104 62,928 63,930 63,603
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 40,248 40,483 40,013 40,413 40,283
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 24,105 24,222 23,987 24,188 24,122
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 80,594 81,065 80,124 80,925 80,664
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 47,958 48,193 47,723 48,124 47,993
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 97,099 97,617 96,580 97,463 97,175
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 57,888 58,147 57,629 58,070 57,926
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 200,892 202,538 199,246 202,051 201,136
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 118,840 119,663 118,017 119,419 118,962
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 100,148 101,229 99,067 100,909 100,308
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 59,412 59,953 58,872 59,793 59,493
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 51,234 51,760 50,707 51,604 51,312
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 30,716 30,979 30,452 30,901 30,755
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 36,414 36,649 36,178 36,579 36,449
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,913 22,030 21,795 21,995 21,930
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 55,860 56,330 55,389 56,191 55,929
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 33,711 33,946 33,476 33,876 33,746
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 107,892 108,598 107,187 108,389 107,997
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 64,694 65,047 64,342 64,943 64,747
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 78,541 79,011 78,071 78,872 78,611
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 46,822 47,057 46,587 46,987 46,857
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 166,477 168,123 164,831 167,635 166,721
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 99,730 100,553 98,907 100,309 99,852
5.47 REMATES LADRILLO PRENSADO ML ### 34,171 34,346 33,995 34,294 34,197
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 40,755 41,533 39,978 41,302 40,870
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 68,180 69,217 67,144 68,910 68,334
5.50 LAVADA DE FACHADA M2 ### 5,316 5,316 5,316 5,316 5,316
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 53,356 54,311 52,401 54,028 53,498
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,740 10,740 10,740 10,740 10,740
5.53 ANCLAJE 3/8" L=30CM UN ### 14,397 14,397 14,397 14,397 14,397
5.54 ANCLAJE 1/2" L=50CM UN ### 18,874 18,874 18,874 18,874 18,874
5.55 ANCLAJE 5/8" L=70CM UN ### 26,758 26,758 26,758 26,758 26,758
5.56 ANCLAJE 3/4" L=70CM UN ### 40,356 40,356 40,356 40,356 40,356
5.57 ANCLAJE 1" L= 70CM UN ### 5,699 5,984 5,414 5,900 5,741
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
p
6 PAÑETES, REVOQUES Y REPELLOS i
6.1 ENTRAMADO MADERA CIELO RASO M2 ### o 16,537 16,537 16,537 16,537 16,537
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,132 6,308 5,957 6,256 6,158
6.3 FILOS O DILATACIONES S/MURO ML ### 7,318 7,494 7,143 7,442 7,344
6.4 GOTERA EN MORTERO 1:4 ML ### 8,707 8,882 8,531 8,830 8,733
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,360 7,360 7,360 7,360 7,360
6.6 MALLA BAJO ENTRAMADO M2 ### 14,209 14,209 14,209 14,209 14,209
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 26,627 27,384 25,870 27,159 26,739
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,907 16,286 15,529 16,174 15,964
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,534 23,028 22,040 22,882 22,607
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,551 13,798 13,304 13,725 13,588
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 22,736 23,493 21,979 23,268 22,848
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,652 14,030 13,274 13,918 13,708
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,534 23,028 22,040 22,882 22,607
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,551 13,798 13,304 13,725 13,588
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 23,834 24,373 23,295 24,214 23,914
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 14,200 14,469 13,930 14,390 14,240
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,651 19,028 18,275 18,916 18,707
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,321 11,509 11,133 11,453 11,349
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 18,805 19,381 18,228 19,211 18,890
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,398 11,686 11,110 11,601 11,441
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 23,313 23,806 22,819 23,660 23,386
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,920 14,167 13,673 14,094 13,957
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 23,514 24,271 22,758 24,047 23,626
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,021 14,399 13,643 14,287 14,077
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 19,415 19,992 18,839 19,821 19,501
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,685 11,973 11,397 11,888 11,728
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 24,404 25,160 23,647 24,936 24,516
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,870 15,248 14,492 15,136 14,926
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 28,857 29,562 28,151 29,353 28,961
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE) M2 ### 93,575 95,524 91,626 94,946 93,863
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 60,564 60,564 60,564 60,564 60,564
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,754 23,754 23,754 23,754 23,754
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ###
p 37,440 37,440 37,440 37,440 37,440
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### i 88,821 88,821 88,821 88,821 88,821
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### o 69,318 69,318 69,318 69,318 69,318
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 39,865 39,865 39,865 39,865 39,865
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 93,141 93,141 93,141 93,141 93,141
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 111,426 111,426 111,426 111,426 111,426
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 164,262 164,262 164,262 164,262 164,262
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 64,079 64,079 64,079 64,079 64,079
7.13 CANAL PVC AMAZONAS ML ### 88,594 88,594 88,594 88,594 88,594
7.14 CANAL PVC RAINGO ML ### 80,347 80,347 80,347 80,347 80,347
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 144,527 144,527 144,527 144,527 144,527
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 84,666 84,666 84,666 84,666 84,666
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 61,966 61,966 61,966 61,966 61,966
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 34,410 34,410 34,410 34,410 34,410
7.19 TEJA DE BARRO M2 ### 64,162 65,040 63,285 64,780 64,292
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 51,685 51,685 51,685 51,685 51,685
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 47,325 47,325 47,325 47,325 47,325
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 39,278 39,278 39,278 39,278 39,278
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 38,514 38,514 38,514 38,514 38,514
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 38,813 38,813 38,813 38,813 38,813
7.25 TEJA TERMOACÚSTICA M2 ### 55,164 55,164 55,164 55,164 55,164
7.26 TEJA PLÁSTICA No.6 M2 ### 48,370 48,370 48,370 48,370 48,370
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 89,256 89,256 89,256 89,256 89,256
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 165,731 165,731 165,731 165,731 165,731
7.29 TEJA SIN TRASLAPO M2 ### 74,160 74,160 74,160 74,160 74,160
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,945 44,945 44,945 44,945 44,945
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 35,467 35,467 35,467 35,467 35,467
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO
7.32 4"x2", 15 MM) M2 ### 62,916 62,916 62,916 62,916 62,916
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,054 21,054 21,054 21,054 21,054
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,550 25,550 25,550 25,550 25,550
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,850 27,850 27,850 27,850 27,850
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 36,150 36,150 36,150 36,150 36,150
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,593 23,593 23,593 23,593 23,593
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 55,692 55,692 55,692 55,692 55,692
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 394,720 394,720 394,720 394,720 394,720
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 430,967 430,967 430,967 430,967 430,967
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ###
i 295,938 295,938 295,938 295,938 295,938
p
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### i 317,335 317,335 317,335 317,335 317,335
o
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 566,222 606,282 526,162 594,413 572,157
8.2 CONCRETO 3500 PSI M3 ### 497,940 534,935 460,944 523,974 503,421
8.3 CONCRETO 3000 PSI M3 ### 497,206 535,422 458,991 524,099 502,868
8.4 CONCRETO 2500 PSI M3 ### 449,712 488,689 410,734 477,140 455,486
8.5 CONCRETO 2000 PSI M3 ### 426,067 466,097 386,036 454,236 431,997
8.6 CONCRETO 1500 PSI M3 ### 395,733 436,908 354,558 424,708 401,833
8.7 MORTERO SECO 1:10 M3 ### 289,328 313,547 265,109 306,371 292,916
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 517,202 540,719 493,685 533,751 520,686
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 526,803 562,832 490,775 552,157 532,141
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 589,879 623,575 556,183 613,591 594,871
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 841,139 874,835 807,443 864,851 846,131
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 133,817 133,817 133,817 133,817 133,817
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,460 4,635 4,284 4,583 4,486
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 148,895 148,895 148,895 148,895 148,895
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 183,292 183,292 183,292 183,292 183,292
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 270,065 270,065 270,065 270,065 270,065
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 300,813 300,813 300,813 300,813 300,813
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 331,594 331,594 331,594 331,594 331,594
9.8 HOJA PUERTA FORTEC 0.81 UN ### 220,741 220,741 220,741 220,741 220,741
9.9 HOJA PUERTA FORTEC 0.91 UN ### 250,414 250,414 250,414 250,414 250,414
9.10 HOJA PUERTA FORTEC 1.50 UN ### 369,106 369,106 369,106 369,106 369,106
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 139,141 139,141 139,141 139,141 139,141
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 185,134 185,134 185,134 185,134 185,134
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 205,905 205,905 205,905 205,905 205,905
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 526,371 526,371 526,371 526,371 526,371
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 45,434 45,434 45,434 45,434 45,434
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,798 27,798 27,798 27,798 27,798
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 107,333 107,333 107,333 107,333 107,333
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 134,326 134,326 134,326 134,326 134,326
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 104,208 104,208 104,208 104,208 104,208
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 31,865 31,865 31,865 31,865 31,865
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ###
i 31,865 31,865 31,865 31,865 31,865
p
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### i 30,174 30,174 30,174 30,174 30,174
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### o 45,973 45,973 45,973 45,973 45,973
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 57,211 57,211 57,211 57,211 57,211
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 69,198 69,198 69,198 69,198 69,198
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 83,434 83,434 83,434 83,434 83,434
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 396,409 396,409 396,409 396,409 396,409
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 276,531 276,531 276,531 276,531 276,531
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 36,232 36,232 36,232 36,232 36,232
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 46,722 46,722 46,722 46,722 46,722
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 57,211 57,211 57,211 57,211 57,211
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 72,196 72,196 72,196 72,196 72,196
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 82,404 82,404 82,404 82,404 82,404
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 233,089 233,089 233,089 233,089 233,089
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 86,645 86,645 86,645 86,645 86,645
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 153,027 153,027 153,027 153,027 153,027
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 147,445 147,445 147,445 147,445 147,445
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 96,763 96,763 96,763 96,763 96,763
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 229,152 229,152 229,152 229,152 229,152
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 118,728 118,728 118,728 118,728 118,728
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 7,085 7,085 7,085 7,085 7,085
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 105,082 105,082 105,082 105,082 105,082
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 131,693 131,693 131,693 131,693 131,693
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 43,331 43,331 43,331 43,331 43,331
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 595,928 595,928 595,928 595,928 595,928
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 213,025 213,025 213,025 213,025 213,025
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 236,679 236,679 236,679 236,679 236,679
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS) M2 ### 541,896 541,896 541,896 541,896 541,896
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 136,423 136,423 136,423 136,423 136,423
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 435,299 435,299 435,299 435,299 435,299
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,490 6,490 6,490 6,490 6,490
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 304,562 304,562 304,562 304,562 304,562
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 130,349 130,349 130,349 130,349 130,349
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
10.21 REJILLA PISO 0.30 M M2 ###
i 93,577 93,577 93,577 93,577 93,577
p
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### i 96,244 96,244 96,244 96,244 96,244
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, o
10.23 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 11,198 11,198 11,198 11,198 11,198
PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 12,486 12,486 12,486 12,486 12,486
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10.25 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 9,814 9,814 9,814 9,814 9,814
SUMINISTRO Y MONTAJE
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 66,155 66,155 66,155 66,155 66,155
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 75,664 75,664 75,664 75,664 75,664
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y
11.50 SOPORTES) ML ### 97,618 97,618 97,618 97,618 97,618
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 111,774 111,774 111,774 111,774 111,774
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 164,814 164,814 164,814 164,814 164,814
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 65,988 65,988 65,988 65,988 65,988
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 66,268 66,268 66,268 66,268 66,268
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 43,213 43,213 43,213 43,213 43,213
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 53,539 53,539 53,539 53,539 53,539
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ###
i 4,571 4,571 4,571 4,571 4,571
p
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### i 7,243 7,243 7,243 7,243 7,243
11.59 GABINETE TIPO III UN ### o 1,113,845 1,113,845 1,113,845 1,113,845 1,113,845
11.60 GABINETE TIPO I UN ### 847,087 847,087 847,087 847,087 847,087
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,888,920 2,888,920 2,888,920 2,888,920 2,888,920
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,406,346 2,406,346 2,406,346 2,406,346 2,406,346
11.63 VÁLVULA MARIPOSA 3" UN ### 689,135 689,135 689,135 689,135 689,135
11.64 VÁLVULA MARIPOSA 4" UN ### 895,657 895,657 895,657 895,657 895,657
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 348,842 348,842 348,842 348,842 348,842
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 398,129 398,129 398,129 398,129 398,129
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 63,287 63,287 63,287 63,287 63,287
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 75,097 75,097 75,097 75,097 75,097
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 83,163 83,163 83,163 83,163 83,163
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 98,178 98,178 98,178 98,178 98,178
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 59,385 59,385 59,385 59,385 59,385
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 67,778 67,778 67,778 67,778 67,778
12.8 STRIP TELEFÓNICO 10 PARES UN ### 155,275 155,275 155,275 155,275 155,275
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 61,062 61,062 61,062 61,062 61,062
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 140,574 140,574 140,574 140,574 140,574
12.11 SALIDA T.V PVC COMPLETA. UN ### 83,866 83,866 83,866 83,866 83,866
12.12 SALIDA BIFÁSICA C.N. UN ### 49,763 49,763 49,763 49,763 49,763
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 104,339 104,339 104,339 104,339 104,339
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 444,964 444,964 444,964 444,964 444,964
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 593,825 593,825 593,825 593,825 593,825
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,849 3,849 3,849 3,849 3,849
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 5,076 5,076 5,076 5,076 5,076
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,917 7,917 7,917 7,917 7,917
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 14,145 14,145 14,145 14,145 14,145
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 297,788 297,788 297,788 297,788 297,788
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 83,746 83,746 83,746 83,746 83,746
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 114,039 114,039 114,039 114,039 114,039
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 45,421 45,421 45,421 45,421 45,421
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,516,909 1,516,909 1,516,909 1,516,909 1,516,909
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,123,527 1,123,527 1,123,527 1,123,527 1,123,527
12.26 POSTE METÁLICO 6M UN ### 1,424,879 1,424,879 1,424,879 1,424,879 1,424,879
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ###
i 666,499 666,499 666,499 666,499 666,499
p
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### i 120,234 120,234 120,234 120,234 120,234
12.29 LUMINARIA 70W SODIO UN ### o 559,632 559,632 559,632 559,632 559,632
12.30 LUMINARIA 150W SODIO UN ### 700,765 700,765 700,765 700,765 700,765
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,854,809 1,854,809 1,854,809 1,854,809 1,854,809
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,365,209 1,365,209 1,365,209 1,365,209 1,365,209
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 45,282 46,578 43,986 46,194 45,474
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 45,543 46,839 44,247 46,455 45,735
13.3 ALISTADO PARA LISTÓN M2 ### 15,961 16,220 15,701 16,143 15,999
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 35,648 38,240 33,056 37,472 36,032
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 98,716 101,308 96,124 100,540 99,100
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 28,961 29,761 28,160 29,524 29,079
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 67,967 71,865 64,069 70,710 68,544
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 96,311 102,548 90,075 100,700 97,235
13.9 MANTO FIBERGLASS 600X1 M2 ### 33,037 33,037 33,037 33,037 33,037
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,462 24,462 24,462 24,462 24,462
13.11 PERMA PLY 2 CAPAS M2 ### 28,540 28,540 28,540 28,540 28,540
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 56,066 59,574 52,558 58,535 56,586
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 66,102 70,390 61,815 69,119 66,737
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 96,879 103,505 90,252 101,541 97,860
13.15 TRITURADO FINO 1/2 M3 ### 158,344 187,405 129,282 178,795 162,649
13.16 TRITURADO GRUESO 3/4 M3 ### 150,615 172,578 129,825 169,241 150,273
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 62,991 63,510 62,473 63,356 63,068
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 37,170 37,430 36,911 37,353 37,209
14.3 ADOQUÍN CONCRETO 6CM M2 ### 73,360 74,656 72,064 74,272 73,552
14.4 ADOQUÍN CONCRETO 8CM M2 ### 77,110 78,406 75,814 78,022 77,302
14.5 ADOQUÍN GRES PEATONAL M2 ### 81,739 83,035 80,443 82,651 81,931
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE
14.6 ALISTADO M2 ### 83,457 83,976 82,939 83,822 83,534
14.7 GRAVILLA PARA GRADAS ML ### 38,982 39,501 38,464 39,347 39,059
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 184,701 187,034 182,369 186,343 185,047
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 50,387 51,683 49,091 51,299 50,579
14.10 GUARDAESCOBA EN GRANITO ML ### 46,175 46,175 46,175 46,175 46,175
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
14.11 GUARDAESCOBA EN GRAVILLA ML ###
i 11,445 11,964 10,927 11,810 11,522
p
14.12 GUARDAESCOBA PVC CARAMELO ML ### i 10,373 10,373 10,373 10,373 10,373
14.13 GUARDAESCOBA PVC CEDRO ML ### o 13,967 13,967 13,967 13,967 13,967
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,310 11,310 11,310 11,310 11,310
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 19,255 19,255 19,255 19,255 19,255
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 37,949 37,949 37,949 37,949 37,949
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,560 9,560 9,560 9,560 9,560
14.18 LISTÓN M.H. AMARILLO M2 ### 80,430 80,430 80,430 80,430 80,430
14.19 PASO ESCALERA GRANITO ML ### 131,159 132,973 129,345 132,436 131,428
14.20 PIRLANES ALUMINIO ML ### 7,727 7,727 7,727 7,727 7,727
14.21 PIRLANES LADRILLO ML ### 34,215 34,566 33,864 34,462 34,267
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 50,343 50,343 50,343 50,343 50,343
14.23 PISO VINILO TRÁFICO PESADO M2 ### 58,722 58,722 58,722 58,722 58,722
14.24 PULIDA LACADA PISO MADERA M2 ### 52,767 52,767 52,767 52,767 52,767
14.25 TABLETA DE GRES 25X25 M2 ### 54,637 55,155 54,119 55,002 54,714
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 61,423 61,941 60,904 61,787 61,499
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,492 11,492 11,492 11,492 11,492
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 54,146 54,673 53,620 54,517 54,224
14.29 JABONERA PORCELANA ACUARIO UN ### 22,544 22,544 22,544 22,544 22,544
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y
14.30 PERCHA SIMPLE) UN ### 135,763 135,763 135,763 135,763 135,763
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,425 10,425 10,425 10,425 10,425
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 24,493 24,493 24,493 24,493 24,493
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,469 15,469 15,469 15,469 15,469
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 15,009 15,009 15,009 15,009 15,009
14.35 REMATES BOCEL ALUMINIO ML ### 8,893 8,893 8,893 8,893 8,893
14.36 REMATES BOCEL PORCELANA ML ### 9,061 9,061 9,061 9,061 9,061
14.37 TAPA REGISTRO 20X20 UN ### 20,646 20,646 20,646 20,646 20,646
14.38 TAPA REGISTRO 6X6 UN ### 18,755 18,755 18,755 18,755 18,755
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,919 20,919 20,919 20,919 20,919
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 24,183 24,183 24,183 24,183 24,183
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 72,566 73,084 72,048 72,931 72,643
14.42 MEDIA CAÑA EN GRANITO ML ### 86,018 86,018 86,018 86,018 86,018
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 35,025 35,025 35,025 35,025 35,025
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,312 14,312 14,312 14,312 14,312
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 113,720 113,720 113,720 113,720 113,720
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ###
i 136,995 136,995 136,995 136,995 136,995
p
i
15 CIELO RASO o
15.1 APLIQUE YESO ML ### 80,719 80,719 80,719 80,719 80,719
15.2 ARMADURA MADERA Y MALLA M2 ### 37,611 37,611 37,611 37,611 37,611
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 59,766 59,766 59,766 59,766 59,766
15.4 CIELO RASO DURACUSTIC M2 ### 73,848 73,848 73,848 73,848 73,848
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 54,918 54,918 54,918 54,918 54,918
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 102,781 102,781 102,781 102,781 102,781
15.7 CORNISAS YESO ML ### 54,316 54,316 54,316 54,316 54,316
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 114,094 114,094 114,094 114,094 114,094
15.9 MALLA CON VENA M2 ### 14,102 14,102 14,102 14,102 14,102
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
16.2 UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 69,981 59,407 86,050 75,831 53,557
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 156,950 185,462 128,438 177,014 161,174
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 144,679 199,508 156,673 175,520 199,508
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 143,942 158,188 137,089 133,662 119,955
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 128,495 183,323 140,488 159,336 183,323
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 141,648 196,477 153,642 172,489 196,477
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 333,726 333,726 333,726 333,726 333,726
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 991,530 991,530 991,530 991,530 991,530
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 535,563 535,563 535,563 535,563 535,563
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 151,792 151,792 151,792 151,792 151,792
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 214,886 214,886 214,886 214,886 214,886
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ###
i 199,263 199,263 199,263 199,263 199,263
p
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### i 443,725 443,725 443,725 443,725 443,725
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### o 1,140,993 1,140,993 1,140,993 1,140,993 1,140,993
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 321,177 321,177 321,177 321,177 321,177
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 225,825 225,825 225,825 225,825 225,825
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 87,504 87,504 87,504 87,504 87,504
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X
17.12 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 274,888 274,888 274,888 274,888 274,888
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120
17.13 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 406,932 406,932 406,932 406,932 406,932
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,837 8,837 8,837 8,837 8,837
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,310 3,310 3,310 3,310 3,310
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,595 11,595 11,595 11,595 11,595
18.4 BARNIZ SOBRE MUEBLES M2 ### 45,170 45,170 45,170 45,170 45,170
18.5 CARBURO SOBRE PAÑETES M2 ### 6,089 6,089 6,089 6,089 6,089
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 72,936 72,936 72,936 72,936 72,936
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,594 3,594 3,594 3,594 3,594
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,956 2,956 2,956 2,956 2,956
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,705 14,705 14,705 14,705 14,705
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,284 4,284 4,284 4,284 4,284
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,517 15,517 15,517 15,517 15,517
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,234 6,234 6,234 6,234 6,234
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 7,057 7,057 7,057 7,057 7,057
18.14 ESTUCO M2 ### 7,273 7,273 7,273 7,273 7,273
18.15 ESTUCO (LINEAL) ML ### 4,531 4,531 4,531 4,531 4,531
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,319 16,319 16,319 16,319 16,319
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,038 10,038 10,038 10,038 10,038
18.18 LACA PISOS MADERA M2 ### 23,615 23,615 23,615 23,615 23,615
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,812 2,812 2,812 2,812 2,812
18.20 MARMOLINA SOBRE PAÑETE M2 ### 13,156 13,156 13,156 13,156 13,156
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,538 3,538 3,538 3,538 3,538
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,320 13,320 13,320 13,320 13,320
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,462 7,462 7,462 7,462 7,462
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,651 4,651 4,651 4,651 4,651
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 23,472 23,472 23,472 23,472 23,472
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
18.26 PINTURA EPÓXICA M2 ###
i 13,260 13,260 13,260 13,260 13,260
p
18.27 PINTURA EPÓXICA (LINEAL) ML ### i 8,139 8,139 8,139 8,139 8,139
o
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,778,105 6,778,105 6,778,105 6,778,105 6,778,105
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO
19.2 PARA MOVILIZAR (PAR) UN ### 11,975,748 11,975,748 11,975,748 11,975,748 11,975,748
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,133,583 3,133,583 3,133,583 3,133,583 3,133,583
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 10,241,902 10,241,902 10,241,902 10,241,902 10,241,902
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,593,796 9,593,796 9,593,796 9,593,796 9,593,796
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,812 2,812 2,812 2,812 2,812
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 959,112 959,112 959,112 959,112 959,112
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 96,205 96,205 96,205 96,205 96,205
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,740,495 1,740,895 1,740,094 1,740,777 1,740,554
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 757,922 767,476 748,368 764,645 759,338
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 127,107 127,107 127,107 127,107 127,107
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,328,846 1,328,846 1,328,846 1,328,846 1,328,846
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 166,230 166,230 166,230 166,230 166,230
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,539,226 1,539,226 1,539,226 1,539,226 1,539,226
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,072,534 1,072,534 1,072,534 1,072,534 1,072,534
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 64,091 64,091 64,091 64,091 64,091
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 126,176 126,176 126,176 126,176 126,176
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 298,347 298,347 298,347 298,347 298,347
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 298,340 298,340 298,340 298,340 298,340
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 479,165 479,165 479,165 479,165 479,165
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 126,229 126,229 126,229 126,229 126,229
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 126,229 126,229 126,229 126,229 126,229
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 298,347 298,347 298,347 298,347 298,347
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 298,347 298,347 298,347 298,347 298,347
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 479,165 479,165 479,165 479,165 479,165
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 477,926 477,926 477,926 477,926 477,926
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 778,450 778,450 778,450 778,450 778,450
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,250,248 1,250,248 1,250,248 1,250,248 1,250,248
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 77,179 77,179 77,179 77,179 77,179
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 399,293 399,293 399,293 399,293 399,293
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 450,711 450,711 450,711 450,711 450,711
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,246,055 1,246,055 1,246,055 1,246,055 1,246,055
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 72,898 73,133 72,662 73,063 72,932
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 361,612 361,612 361,612 361,612 361,612
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 55,239 55,239 55,239 55,239 55,239
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 78,276 78,276 78,276 78,276 78,276
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 113,126 113,126 113,126 113,126 113,126
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 173,731 173,731 173,731 173,731 173,731
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 279,531 279,531 279,531 279,531 279,531
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 403,862 403,862 403,862 403,862 403,862
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 511,606 511,606 511,606 511,606 511,606
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 672,875 672,875 672,875 672,875 672,875
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 926,773 926,773 926,773 926,773 926,773
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 905,184 933,846 876,523 925,354 909,430
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 80,351 81,580 79,123 81,216 80,533
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 95,327 96,556 94,099 96,192 95,509
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 66,597 70,689 62,504 69,477 67,203
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 71,583 75,596 67,571 74,407 72,178
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ###
i 71,661 75,545 67,776 74,394 72,236
p
5.6 BORDE SEPARADOR VERDE A-170 ML ### i 281,486 282,160 280,812 281,960 281,585
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### o 19,838 20,329 19,347 20,183 19,910
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 47,450 50,334 44,566 49,480 47,877
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 91,160 91,520 90,800 91,413 91,213
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 611,288 620,283 602,294 617,618 612,621
5.11 LOSETA PREFABRICADA A-40 M2 ### 70,235 71,777 68,693 71,320 70,463
5.12 LOSETA PREFABRICADA A-60 M2 ### 102,059 103,601 100,516 103,144 102,287
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 38,024 39,629 36,419 39,153 38,261
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 62,672 65,920 59,424 64,958 63,153
5.15 SARDINEL PREFABRICADO A-10 ML ### 107,354 114,082 108,387 111,190 113,776
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 66,725 67,658 65,792 67,382 66,863
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 224,648 226,559 222,738 225,993 224,932
6.2 BANCA EN CONCRETO M-30 UN ### 737,819 740,494 735,144 739,702 738,216
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 234,765 235,165 234,365 235,047 234,824
6.4 BOLARDO M-60 CONCRETO UN ### 179,052 181,345 176,759 180,666 179,392
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 180,920 183,213 178,627 182,533 181,260
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 212,647 215,049 210,245 214,337 213,003
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 63,198 64,139 62,258 63,860 63,338
6.8 BORDILLO PREFABRICADO A-80 ML ### 75,186 76,239 74,133 75,927 75,342
6.9 CANECA M-120 UN ### 343,639 343,874 343,404 343,804 343,674
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 906,375 907,522 905,229 907,182 906,545
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,732,495 3,733,259 3,731,730 3,733,032 3,732,608
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,839,887 3,840,651 3,839,122 3,840,424 3,840,000
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 536,974 537,775 536,174 537,538 537,093
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 714,755 717,957 711,552 717,008 715,229
6.15 BANCA EN MADERA M-50 UN ### 588,519 588,519 588,519 588,519 588,519
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 271,082 272,228 269,935 271,889 271,252
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 635,370 635,958 634,782 635,783 635,457
6.18 POSTE HISTÓRICO M-131 UN ### 7,102,844 7,108,577 7,097,112 7,106,878 7,103,694
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,456 4,456 4,456 4,456 4,456
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 46,973 46,973 46,973 46,973 46,973
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 344,888 345,225 344,551 345,125 344,938
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ###
i 543,019 544,621 541,418 544,146 543,257
p
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### i 254,403 254,740 254,066 254,640 254,453
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### o 270,515 270,852 270,178 270,752 270,565
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 282,717 283,054 282,380 282,954 282,767
7.8 TACHAS REFLECTIVAS UN ### 14,777 14,777 14,777 14,777 14,777
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,799 15,799 15,799 15,799 15,799
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 129,560 129,560 129,560 129,560 129,560
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
VÍAS (SEGÚN ESPECIFICACIONES p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.1 201 P UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.2 201 P DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.3 200.1 DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.5 201.7 DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
CONSTRUCCIÓN
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
999,730 996,412 1,003,208
11,281 11,281 11,281
4,094 4,094 4,094
2,954,012 2,954,012 2,954,012
270,723 270,723 270,723
9,189 9,189 9,189
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
218,760 218,662 218,987
520,964 503,672 525,911
250,979 247,621 255,829
292,120 286,596 300,317
393,158 384,610 408,411
108,052 107,942 107,881
1,418,161 1,417,067 1,416,450
127,488 126,411 130,002
81,001 80,432 82,327
31,747 31,355 32,662
50,572 50,180 51,486
66,727 66,179 68,007
91,151 90,524 92,614
125,203 124,655 126,484
1,083,400 1,077,130 1,098,030
1,552,160 1,539,620 1,581,420
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
93,562 91,445 98,502
106,300 103,710 112,342
124,998 121,751 132,576
838,445 817,275 887,841
54,356 53,706 55,872
339,081 329,627 361,141
4,602 4,602 4,602
4,827 4,827 4,827
6,608 6,608 6,608
988,312 967,142 1,037,708
920,192 897,021 974,258
983,639 962,470 1,033,035
963,610 942,440 1,013,006
1,175,199 1,154,029 1,224,595
448,301 424,740 503,277
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
65,171 65,040 65,476
38,638 38,573 38,790
109,571 108,917 111,095
63,864 63,538 64,626
40,387 40,257 40,692
24,174 24,109 24,327
80,873 80,612 81,483
48,098 47,967 48,402
97,406 97,118 98,078
58,041 57,897 58,377
201,868 200,953 204,002
119,328 118,871 120,395
100,789 100,188 102,190
59,733 59,432 60,433
51,546 51,253 52,228
30,872 30,725 31,213
36,553 36,422 36,858
21,982 21,917 22,135
56,138 55,877 56,748
33,850 33,719 34,155
108,310 107,918 109,225
64,903 64,707 65,361
78,820 78,559 79,430
46,961 46,831 47,266
167,452 166,538 169,586
100,218 99,760 101,285
34,275 34,177 34,502
41,216 40,784 42,224
68,795 68,219 70,139
5,316 5,316 5,316
53,922 53,392 55,160
10,740 10,740 10,740
14,397 14,397 14,397
18,874 18,874 18,874
26,758 26,758 26,758
40,356 40,356 40,356
5,868 5,710 6,238
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
37,440 37,440 37,440
88,821 88,821 88,821
69,318 69,318 69,318
39,865 39,865 39,865
93,141 93,141 93,141
111,426 111,426 111,426
164,262 164,262 164,262
64,079 64,079 64,079
88,594 88,594 88,594
80,347 80,347 80,347
144,527 144,527 144,527
84,666 84,666 84,666
61,966 61,966 61,966
34,410 34,410 34,410
64,682 64,195 65,820
51,685 51,685 51,685
47,325 47,325 47,325
39,278 39,278 39,278
38,514 38,514 38,514
38,813 38,813 38,813
55,164 55,164 55,164
48,370 48,370 48,370
89,256 89,256 89,256
165,731 165,731 165,731
74,160 74,160 74,160
44,945 44,945 44,945
35,467 35,467 35,467
62,916 62,916 62,916
21,054 21,054 21,054
25,550 25,550 25,550
27,850 27,850 27,850
36,150 36,150 36,150
23,593 23,593 23,593
55,692 55,692 55,692
394,720 394,720 394,720
430,967 430,967 430,967
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
295,938 295,938 295,938
317,335 317,335 317,335
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
31,865 31,865 31,865
30,174 30,174 30,174
45,973 45,973 45,973
57,211 57,211 57,211
69,198 69,198 69,198
83,434 83,434 83,434
396,409 396,409 396,409
276,531 276,531 276,531
36,232 36,232 36,232
46,722 46,722 46,722
57,211 57,211 57,211
72,196 72,196 72,196
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
93,577 93,577 93,577
96,244 96,244 96,244
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
24,918 24,918 24,918
15,286 15,286 15,286
9,062 9,062 9,062
55,923 55,923 55,923
35,635 35,635 35,635
11,396 11,396 11,396
27,369 27,369 27,369
38,101 38,101 38,101
51,793 51,793 51,793
97,721 97,721 97,721
117,860 117,860 117,860
65,564 65,564 65,564
83,842 83,842 83,842
203,615 203,615 203,615
421,613 421,613 421,613
310,809 310,809 310,809
18,986 18,986 18,986
23,999 23,999 23,999
186,863 186,863 186,863
305,727 305,727 305,727
509,925 509,925 509,925
44,102 44,102 44,102
52,072 52,072 52,072
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
4,571 4,571 4,571
7,243 7,243 7,243
1,113,845 1,113,845 1,113,845
847,087 847,087 847,087
2,888,920 2,888,920 2,888,920
2,406,346 2,406,346 2,406,346
689,135 689,135 689,135
895,657 895,657 895,657
348,842 348,842 348,842
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
666,499 666,499 666,499
120,234 120,234 120,234
559,632 559,632 559,632
700,765 700,765 700,765
1,854,809 1,854,809 1,854,809
1,365,209 1,365,209 1,365,209
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
11,752 11,464 12,424
10,373 10,373 10,373
13,967 13,967 13,967
11,310 11,310 11,310
19,255 19,255 19,255
37,949 37,949 37,949
9,560 9,560 9,560
80,430 80,430 80,430
132,234 131,226 134,586
7,727 7,727 7,727
34,423 34,228 34,878
50,343 50,343 50,343
58,722 58,722 58,722
52,767 52,767 52,767
54,944 54,656 55,616
61,730 61,442 62,402
11,492 11,492 11,492
54,458 54,166 55,141
22,544 22,544 22,544
135,763 135,763 135,763
10,425 10,425 10,425
24,493 24,493 24,493
15,469 15,469 15,469
15,009 15,009 15,009
8,893 8,893 8,893
9,061 9,061 9,061
20,646 20,646 20,646
18,755 18,755 18,755
20,919 20,919 20,919
24,183 24,183 24,183
72,873 72,585 73,545
86,018 86,018 86,018
35,025 35,025 35,025
14,312 14,312 14,312
113,720 113,720 113,720
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
136,995 136,995 136,995
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
199,263 199,263 199,263
443,725 443,725 443,725
1,140,993 1,140,993 1,140,993
321,177 321,177 321,177
225,825 225,825 225,825
87,504 87,504 87,504
274,888 274,888 274,888
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
13,260 13,260 13,260
8,139 8,139 8,139
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
113,893 113,893 113,893
282,979 282,979 282,979
56,312 56,312 56,312
631,701 631,701 631,701
1,580,058 1,580,058 1,580,058
45,827 45,827 45,827
246,536 246,536 246,536
47,068 47,068 47,068
4,114 4,114 4,114
7,008 7,008 7,008
19,445 19,445 19,445
25,600 25,600 25,600
33,379 33,379 33,379
135,672 135,672 135,672
35,360 35,360 35,360
116,331 116,331 116,331
196,253 196,253 196,253
313,460 313,460 313,460
387,106 387,106 387,106
424,197 424,197 424,197
614,128 614,128 614,128
359,716 359,716 359,716
114,919 114,919 114,919
15,416 15,416 15,416
31,588 31,588 31,588
5,409 5,409 5,409
37,770 37,770 37,770
39,538 39,538 39,538
40,421 40,421 40,421
26,338 26,338 26,338
29,246 29,246 29,246
30,468 30,468 30,468
51,944 51,944 51,944
676,952 676,952 676,952
345,626 345,626 345,626
94,417 94,417 94,417
1,975 1,975 1,975
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
9,150 9,150 9,150
13,788 13,788 13,788
23,124 23,124 23,124
4,235 4,235 4,235
23,126 23,126 23,126
34,009 34,009 34,009
20,541 20,541 20,541
16,639 16,639 16,639
688,330 688,330 688,330
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
URBANISMO
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
1,485,907 1,485,907 1,485,907
2,195,839 2,195,839 2,195,839
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
73,037 72,906 73,342
361,612 361,612 361,612
55,239 55,239 55,239
78,276 78,276 78,276
113,126 113,126 113,126
173,731 173,731 173,731
279,531 279,531 279,531
403,862 403,862 403,862
511,606 511,606 511,606
672,875 672,875 672,875
926,773 926,773 926,773
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
73,962 71,804 78,998
281,885 281,511 282,759
20,129 19,856 20,765
49,159 47,557 52,898
91,373 91,173 91,840
616,618 611,622 628,278
71,149 70,292 73,148
102,973 102,116 104,972
38,975 38,083 41,055
64,597 62,792 68,808
110,155 107,766 115,398
67,278 66,760 68,488
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
543,968 543,079 546,044
254,602 254,415 255,039
270,714 270,527 271,151
282,916 282,729 283,353
14,777 14,777 14,777
15,799 15,799 15,799
129,560 129,560 129,560
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
SPECIFICACIONES TÉCNICAS INVIAS 2007)
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
970,061 946,693 1,024,587
689,331 668,573 737,768
790,203 768,622 840,558
689,321 667,878 739,356
790,193 767,900 842,209
848,352 826,909 898,387
712,948 690,655 764,963
896,447 874,155 948,463
12,403 12,403 12,403
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
15,673 15,673 15,673
21,171 21,171 21,171
25,424 25,424 25,424
ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
46,973 46,973 46,973
91,934 91,934 91,934
76,385 76,385 76,385
164,876 163,868 167,228
14,777 14,777 14,777
DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,955,579 1,960,077 1,950,440 1,962,004 1,956,221 1,957,506
1.2 CAMPAMENTO 9 M2 UN ### 1,143,539 1,145,788 1,140,970 1,146,752 1,143,861 1,144,503
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,043 14,043 14,043 14,043 14,043 14,043
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,742 15,742 15,742 15,742 15,742 15,742
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,211 18,211 18,211 18,211 18,211 18,211
1.6 CERCA EN TABLA H=2.30 M ML ### 64,881 64,881 64,881 64,881 64,881 64,881
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 45,349 45,398 45,293 45,419 45,356 45,370
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 20,923 20,972 20,867 20,993 20,930 20,944
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 888,355 889,045 887,793 889,057 888,624 889,063
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,298 10,298 10,298 10,298 10,298 10,298
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,710 3,710 3,710 3,710 3,710 3,710
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,651,638 2,651,638 2,651,638 2,651,638 2,651,638 2,651,638
1.44 RED TELEFÓNICA PROVISIONAL UN ### 245,773 245,773 245,773 245,773 245,773 245,773
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 71,913 77,098 73,671 73,671 77,098 82,238
2.2 BASE ARENA CEMENTO 1:20 M3 ### 146,359 148,973 143,370 150,094 146,732 147,479
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 21,891 21,891 21,891 21,891 21,891 21,891
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 607,499 612,314 601,996 614,378 608,187 609,563
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 608,755 613,757 603,037 615,901 609,470 610,898
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 567,132 571,817 561,778 573,824 567,802 569,140
2.9 PILOTE DE MADERA D=20 CM ML ### 49,563 49,563 49,563 49,563 49,563 49,563
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM) ML ### 152,832 152,832 152,832 152,832 152,832 152,832
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 DISTANCIA MENOR DE 5 KM) ML ### 190,243 190,243 190,243 190,243 190,243 190,243
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 DISTANCIA MENOR DE 5 KM) ML ### 235,484 235,484 235,484 235,484 235,484 235,484
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 DISTANCIA MENOR DE 5 KM) ML ### 296,385 296,385 296,385 296,385 296,385 296,385
2.14 PILOTE HINCADO 25X25 ML ### 102,293 102,635 101,902 102,782 102,342 102,440
2.15 PILOTE HINCADO 30X30 ML ### 125,672 126,168 125,105 126,380 125,743 125,885
2.16 DADOS EN CONCRETO 3500PSI M3 ### 552,983 557,667 547,629 559,675 553,652 554,990
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 91,424 91,424 91,424 91,424 91,424 91,424
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 41,776 41,776 41,776 41,776 41,776 41,776
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 55,095 55,095 55,095 55,095 55,095 55,095
4.3 COLUMNAS 3500 PSI M3 ### 771,989 776,673 766,635 778,681 772,658 773,996
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 228,626 235,024 223,464 233,826 231,152 230,771
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI M2 ### 94,677 95,132 94,157 95,327 94,742 94,872
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 111,550 112,096 110,927 112,330 111,628 111,784
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 124,238 124,966 123,407 125,278 124,342 124,550
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 131,044 131,817 130,160 132,148 131,154 131,375
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 149,659 150,614 148,567 151,023 149,795 150,068
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 166,252 167,344 165,005 167,811 166,408 166,720
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 184,410 185,638 183,007 186,164 184,586 184,936
4.12 ENTREPISO VIGUETA PLACA M2 ### 97,838 97,901 97,766 97,928 97,847 97,865
4.13 ESCALERA MACIZA 3500 PSI M3 ### 918,262 922,946 912,908 924,954 918,931 920,269
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ###
i 93,930 93,998 93,852 94,027 93,940 93,959
p
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### i 75,896 76,365 75,361 76,566 75,963 76,097
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### o 85,055 85,628 84,400 85,874 85,137 85,301
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 98,775 99,494 97,954 99,802 98,878 99,083
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 672,270 676,954 666,916 678,962 672,939 674,277
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,292 48,437 48,127 48,499 48,313 48,354
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 266,617 268,709 264,225 269,605 266,916 267,513
4.21 ACERO FIGURADO 37000 PSI KG ### 4,141 4,141 4,141 4,141 4,141 4,141
4.22 ACERO FIGURADO 60000 PSI KG ### 4,343 4,343 4,343 4,343 4,343 4,343
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,118 6,118 6,118 6,118 6,118 6,118
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 818,940 823,625 813,586 825,632 819,610 820,948
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 740,600 745,726 734,740 747,923 741,332 742,797
4.26 VIGA AÉREA 3500 PSI M3 ### 812,720 817,404 807,366 819,411 813,389 814,727
4.27 VIGA CINTA 3500 PSI M3 ### 792,633 797,318 787,279 799,325 793,303 794,641
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,002,995 1,007,679 997,641 1,009,687 1,003,664 1,005,002
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 287,085 292,233 281,204 294,439 287,821 289,292
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 28,717 28,830 28,588 28,878 28,733 28,765
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,081 49,194 48,952 49,242 49,097 49,130
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 34,600 34,617 34,582 34,624 34,603 34,607
5.4 ARCOS EN LADRILLO PRENSADO ML ### 162,720 162,753 162,683 162,766 162,725 162,734
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,092 43,236 42,926 43,298 43,112 43,154
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,705 26,773 26,627 26,802 26,715 26,734
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 97,083 97,148 97,009 97,176 97,092 97,111
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 87,343 87,825 86,791 88,032 87,412 87,550
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 90,802 90,802 90,802 90,802 90,802 90,802
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,325 53,325 53,325 53,325 53,325 53,325
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 87,467 87,467 87,467 87,467 87,467 87,467
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,657 51,657 51,657 51,657 51,657 51,657
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 101,294 101,294 101,294 101,294 101,294 101,294
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 59,892 59,892 59,892 59,892 59,892 59,892
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 112,613 112,613 112,613 112,613 112,613 112,613
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 65,552 65,552 65,552 65,552 65,552 65,552
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 39,881 39,913 39,843 39,927 39,885 39,895
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,254 24,270 24,235 24,277 24,256 24,261
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 52,256 52,278 52,231 52,287 52,259 52,265
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ###
i 31,507 31,518 31,495 31,523 31,509 31,512
p
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### i 58,832 58,854 58,807 58,863 58,835 58,841
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### o 35,469 35,480 35,456 35,484 35,470 35,473
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 96,430 96,539 96,306 96,586 96,446 96,477
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 57,294 57,349 57,232 57,372 57,302 57,318
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 36,713 36,735 36,689 36,744 36,717 36,723
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,338 22,348 22,325 22,353 22,339 22,342
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 72,977 73,021 72,928 73,039 72,984 72,996
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,150 44,172 44,125 44,181 44,153 44,159
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 87,043 87,112 86,966 87,141 87,053 87,073
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 52,860 52,894 52,821 52,909 52,865 52,875
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 177,715 177,867 177,541 177,932 177,737 177,780
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 107,251 107,327 107,164 107,360 107,262 107,284
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 87,689 87,757 87,612 87,786 87,699 87,719
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 53,183 53,217 53,144 53,232 53,188 53,198
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 45,715 45,764 45,659 45,785 45,722 45,736
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 27,956 27,980 27,928 27,991 27,960 27,967
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,216 33,238 33,191 33,247 33,219 33,225
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,314 20,325 20,301 20,329 20,315 20,318
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 49,886 49,930 49,836 49,948 49,892 49,905
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 30,724 30,746 30,699 30,755 30,727 30,733
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 96,518 96,583 96,443 96,611 96,527 96,546
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 59,007 59,040 58,970 59,054 59,012 59,021
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 70,629 70,673 70,580 70,692 70,636 70,648
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 42,792 42,813 42,767 42,823 42,795 42,801
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 147,291 147,444 147,117 147,509 147,313 147,357
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 90,031 90,107 89,943 90,139 90,041 90,063
5.47 REMATES LADRILLO PRENSADO ML ### 31,305 31,322 31,287 31,329 31,308 31,312
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 35,146 35,195 35,091 35,216 35,153 35,167
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 59,749 59,814 59,675 59,842 59,758 59,777
5.50 LAVADA DE FACHADA M2 ### 5,242 5,242 5,242 5,242 5,242 5,242
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,441 49,554 49,312 49,602 49,457 49,490
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,592 10,592 10,592 10,592 10,592 10,592
5.53 ANCLAJE 3/8" L=30CM UN ### 13,937 13,937 13,937 13,937 13,937 13,937
5.54 ANCLAJE 1/2" L=50CM UN ### 18,196 18,196 18,196 18,196 18,196 18,196
5.55 ANCLAJE 5/8" L=70CM UN ### 25,375 25,375 25,375 25,375 25,375 25,375
5.56 ANCLAJE 3/4" L=70CM UN ### 37,707 37,707 37,707 37,707 37,707 37,707
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
5.57 ANCLAJE 1" L= 70CM UN ###
i 4,688 4,722 4,648 4,737 4,693 4,703
p
i
6 PAÑETES, REVOQUES Y REPELLOS o
6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,113 16,113 16,113 16,113 16,113 16,113
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,435 5,451 5,416 5,458 5,437 5,442
6.3 FILOS O DILATACIONES S/MURO ML ### 6,621 6,637 6,602 6,644 6,623 6,628
6.4 GOTERA EN MORTERO 1:4 ML ### 7,886 7,903 7,868 7,910 7,889 7,893
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,783 6,783 6,783 6,783 6,783 6,783
6.6 MALLA BAJO ENTRAMADO M2 ### 13,649 13,649 13,649 13,649 13,649 13,649
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 23,192 23,240 23,138 23,260 23,199 23,213
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,190 14,214 14,163 14,224 14,194 14,200
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 20,189 20,235 20,137 20,254 20,196 20,209
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,378 12,401 12,352 12,411 12,382 12,388
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 19,301 19,349 19,247 19,369 19,308 19,322
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 11,935 11,958 11,907 11,968 11,938 11,945
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 20,189 20,235 20,137 20,254 20,196 20,209
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,378 12,401 12,352 12,411 12,382 12,388
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 20,758 20,791 20,719 20,806 20,763 20,772
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 12,662 12,678 12,642 12,686 12,664 12,669
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 16,864 16,899 16,825 16,914 16,869 16,879
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,428 10,445 10,408 10,452 10,430 10,435
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,188 16,224 16,147 16,240 16,193 16,204
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,089 10,108 10,069 10,115 10,092 10,097
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 20,967 21,013 20,915 21,033 20,974 20,987
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 12,747 12,770 12,721 12,780 12,751 12,757
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 20,080 20,127 20,025 20,147 20,086 20,100
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,304 12,327 12,277 12,338 12,307 12,314
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 16,798 16,835 16,757 16,850 16,804 16,814
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,377 10,395 10,356 10,403 10,379 10,385
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 20,969 21,016 20,915 21,037 20,976 20,989
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,153 13,176 13,126 13,186 13,156 13,163
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 25,506 25,572 25,432 25,600 25,516 25,534
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7.2 TELA IMPERMEABLE) M2 ### 80,958 81,199 80,682 81,303 80,992 81,061
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 54,800 54,800 54,800 54,800 54,800 54,800
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ###
i 21,970 21,970 21,970 21,970 21,970 21,970
p
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### i 34,451 34,451 34,451 34,451 34,451 34,451
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### o 79,961 79,961 79,961 79,961 79,961 79,961
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 62,698 62,698 62,698 62,698 62,698 62,698
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 36,626 36,626 36,626 36,626 36,626 36,626
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 83,784 83,784 83,784 83,784 83,784 83,784
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 99,972 99,972 99,972 99,972 99,972 99,972
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 146,739 146,739 146,739 146,739 146,739 146,739
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 58,252 58,252 58,252 58,252 58,252 58,252
7.13 CANAL PVC AMAZONAS ML ### 81,099 81,099 81,099 81,099 81,099 81,099
7.14 CANAL PVC RAINGO ML ### 73,799 73,799 73,799 73,799 73,799 73,799
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 130,313 130,313 130,313 130,313 130,313 130,313
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 76,015 76,015 76,015 76,015 76,015 76,015
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 55,922 55,922 55,922 55,922 55,922 55,922
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,174 32,174 32,174 32,174 32,174 32,174
7.19 TEJA DE BARRO M2 ### 57,501 57,582 57,408 57,617 57,513 57,536
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 46,607 46,607 46,607 46,607 46,607 46,607
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 42,748 42,748 42,748 42,748 42,748 42,748
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,299 36,299 36,299 36,299 36,299 36,299
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 35,521 35,521 35,521 35,521 35,521 35,521
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 35,787 35,787 35,787 35,787 35,787 35,787
7.25 TEJA TERMOACÚSTICA M2 ### 50,170 50,170 50,170 50,170 50,170 50,170
7.26 TEJA PLÁSTICA No.6 M2 ### 44,156 44,156 44,156 44,156 44,156 44,156
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 80,537 80,537 80,537 80,537 80,537 80,537
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 148,369 148,369 148,369 148,369 148,369 148,369
7.29 TEJA SIN TRASLAPO M2 ### 66,828 66,828 66,828 66,828 66,828 66,828
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,463 42,463 42,463 42,463 42,463 42,463
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,181 33,181 33,181 33,181 33,181 33,181
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM) M2 ### 57,478 57,478 57,478 57,478 57,478 57,478
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 19,991 19,991 19,991 19,991 19,991 19,991
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 23,971 23,971 23,971 23,971 23,971 23,971
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 25,913 25,913 25,913 25,913 25,913 25,913
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,260 33,260 33,260 33,260 33,260 33,260
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,054 22,054 22,054 22,054 22,054 22,054
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 51,870 51,870 51,870 51,870 51,870 51,870
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 350,798 350,798 350,798 350,798 350,798 350,798
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ###
i 407,970 407,970 407,970 407,970 407,970 407,970
p
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### i 267,955 267,955 267,955 267,955 267,955 267,955
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### o 285,904 285,904 285,904 285,904 285,904 285,904
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 418,538 423,498 412,870 425,623 419,246 420,664
8.2 CONCRETO 3500 PSI M3 ### 364,272 368,820 359,074 370,769 364,922 366,221
8.3 CONCRETO 3000 PSI M3 ### 361,719 366,394 356,376 368,398 362,387 363,723
8.4 CONCRETO 2500 PSI M3 ### 317,783 322,609 312,268 324,677 318,473 319,851
8.5 CONCRETO 2000 PSI M3 ### 293,886 298,800 288,271 300,906 294,588 295,992
8.6 CONCRETO 1500 PSI M3 ### 263,613 268,611 257,903 270,752 264,327 265,755
8.7 MORTERO SECO 1:10 M3 ### 195,537 197,778 192,976 198,739 195,857 196,498
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 405,523 407,699 403,036 408,632 405,834 406,456
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 363,252 365,510 360,672 366,477 363,575 364,220
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 426,434 428,545 424,021 429,450 426,735 427,339
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 648,854 650,965 646,441 651,870 649,155 649,759
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 122,127 122,127 122,127 122,127 122,127 122,127
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,648 3,664 3,629 3,671 3,650 3,655
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 136,943 136,943 136,943 136,943 136,943 136,943
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 167,390 167,390 167,390 167,390 167,390 167,390
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 242,122 242,122 242,122 242,122 242,122 242,122
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 269,413 269,413 269,413 269,413 269,413 269,413
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 296,737 296,737 296,737 296,737 296,737 296,737
9.8 HOJA PUERTA FORTEC 0.81 UN ### 196,889 196,889 196,889 196,889 196,889 196,889
9.9 HOJA PUERTA FORTEC 0.91 UN ### 223,154 223,154 223,154 223,154 223,154 223,154
9.10 HOJA PUERTA FORTEC 1.50 UN ### 328,214 328,214 328,214 328,214 328,214 328,214
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 124,659 124,659 124,659 124,659 124,659 124,659
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 165,370 165,370 165,370 165,370 165,370 165,370
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 183,756 183,756 183,756 183,756 183,756 183,756
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 467,421 467,421 467,421 467,421 467,421 467,421
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 41,826 41,826 41,826 41,826 41,826 41,826
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,215 26,215 26,215 26,215 26,215 26,215
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 98,909 98,909 98,909 98,909 98,909 98,909
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 119,680 119,680 119,680 119,680 119,680 119,680
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,021 93,021 93,021 93,021 93,021 93,021
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ###
i 28,986 28,986 28,986 28,986 28,986 28,986
p
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### i 28,986 28,986 28,986 28,986 28,986 28,986
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### o 27,489 27,489 27,489 27,489 27,489 27,489
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,100 42,100 42,100 42,100 42,100 42,100
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,049 52,049 52,049 52,049 52,049 52,049
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 62,660 62,660 62,660 62,660 62,660 62,660
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,261 75,261 75,261 75,261 75,261 75,261
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 353,388 353,388 353,388 353,388 353,388 353,388
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 247,277 247,277 247,277 247,277 247,277 247,277
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,479 33,479 33,479 33,479 33,479 33,479
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 42,764 42,764 42,764 42,764 42,764 42,764
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,049 52,049 52,049 52,049 52,049 52,049
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,312 65,312 65,312 65,312 65,312 65,312
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 75,514 75,514 75,514 75,514 75,514 75,514
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 208,895 208,895 208,895 208,895 208,895 208,895
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO) ML ### 80,128 80,128 80,128 80,128 80,128 80,128
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,033 144,033 144,033 144,033 144,033 144,033
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 135,659 135,659 135,659 135,659 135,659 135,659
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,083 89,083 89,083 89,083 89,083 89,083
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 209,609 209,609 209,609 209,609 209,609 209,609
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 109,383 109,383 109,383 109,383 109,383 109,383
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,574 6,574 6,574 6,574 6,574 6,574
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 99,448 99,448 99,448 99,448 99,448 99,448
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00
10,10(1) MTS M2 ### 119,916 119,916 119,916 119,916 119,916 119,916
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 40,926 40,926 40,926 40,926 40,926 40,926
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 532,173 532,173 532,173 532,173 532,173 532,173
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 191,779 191,779 191,779 191,779 191,779 191,779
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 215,936 215,936 215,936 215,936 215,936 215,936
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS) M2 ### 485,671 485,671 485,671 485,671 485,671 485,671
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 128,111 128,111 128,111 128,111 128,111 128,111
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 387,884 387,884 387,884 387,884 387,884 387,884
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ###
i 6,001 6,001 6,001 6,001 6,001 6,001
p
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### i 273,264 273,264 273,264 273,264 273,264 273,264
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### o 121,815 121,815 121,815 121,815 121,815 121,815
10.21 REJILLA PISO 0.30 M M2 ### 85,540 85,540 85,540 85,540 85,540 85,540
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 88,408 88,408 88,408 88,408 88,408 88,408
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,555 10,555 10,555 10,555 10,555 10,555
SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,694 11,694 11,694 11,694 11,694 11,694
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,329 9,329 9,329 9,329 9,329 9,329
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 278,876 278,876 278,876 278,876 278,876 278,876
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 463,753 463,753 463,753 463,753 463,753 463,753
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 360,004 360,004 360,004 360,004 360,004 360,004
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 57,194 57,194 57,194 57,194 57,194 57,194
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 67,650 67,650 67,650 67,650 67,650 67,650
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 75,181 75,181 75,181 75,181 75,181 75,181
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 88,475 88,475 88,475 88,475 88,475 88,475
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 53,802 53,802 53,802 53,802 53,802 53,802
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,297 61,297 61,297 61,297 61,297 61,297
12.8 STRIP TELEFÓNICO 10 PARES UN ### 141,896 141,896 141,896 141,896 141,896 141,896
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 55,224 55,224 55,224 55,224 55,224 55,224
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 126,830 126,830 126,830 126,830 126,830 126,830
12.11 SALIDA T.V PVC COMPLETA. UN ### 75,914 75,914 75,914 75,914 75,914 75,914
12.12 SALIDA BIFÁSICA C.N. UN ### 45,005 45,005 45,005 45,005 45,005 45,005
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,038 95,038 95,038 95,038 95,038 95,038
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 405,964 405,964 405,964 405,964 405,964 405,964
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 540,377 540,377 540,377 540,377 540,377 540,377
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,497 3,497 3,497 3,497 3,497 3,497
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
12.17 TUBERÍA PVC CONDUIT 3/4" ML ###
i 4,621 4,621 4,621 4,621 4,621 4,621
p
12.18 TUBERÍA PVC CONDUIT 1" ML ### i 7,183 7,183 7,183 7,183 7,183 7,183
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### o 12,853 12,853 12,853 12,853 12,853 12,853
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 269,881 269,881 269,881 269,881 269,881 269,881
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,377 76,377 76,377 76,377 76,377 76,377
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 103,191 103,191 103,191 103,191 103,191 103,191
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,453 42,453 42,453 42,453 42,453 42,453
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,386,468 1,386,468 1,386,468 1,386,468 1,386,468 1,386,468
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,027,690 1,027,690 1,027,690 1,027,690 1,027,690 1,027,690
12.26 POSTE METÁLICO 6M UN ### 1,279,036 1,279,036 1,279,036 1,279,036 1,279,036 1,279,036
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 594,089 594,089 594,089 594,089 594,089 594,089
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 108,904 108,904 108,904 108,904 108,904 108,904
12.29 LUMINARIA 70W SODIO UN ### 498,312 498,312 498,312 498,312 498,312 498,312
12.30 LUMINARIA 150W SODIO UN ### 623,238 623,238 623,238 623,238 623,238 623,238
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,644,905 1,644,905 1,644,905 1,644,905 1,644,905 1,644,905
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,211,529 1,211,529 1,211,529 1,211,529 1,211,529 1,211,529
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 37,855 37,937 37,763 37,971 37,867 37,890
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 37,426 37,508 37,334 37,542 37,438 37,461
13.3 ALISTADO PARA LISTÓN M2 ### 14,382 14,398 14,363 14,405 14,384 14,389
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 24,437 24,599 24,251 24,669 24,460 24,506
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 80,798 80,960 80,612 81,030 80,821 80,868
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,115 26,213 26,003 26,255 26,129 26,157
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 54,492 54,975 53,941 55,182 54,561 54,699
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 74,765 75,537 73,883 75,868 74,875 75,096
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,218 30,218 30,218 30,218 30,218 30,218
13.10 PEGANTE MORTERO-CONCRETO M2 ### 22,993 22,993 22,993 22,993 22,993 22,993
13.11 PERMA PLY 2 CAPAS M2 ### 27,032 27,032 27,032 27,032 27,032 27,032
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 44,052 44,486 43,556 44,673 44,114 44,238
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 51,449 51,980 50,843 52,208 51,525 51,677
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 74,169 74,990 73,232 75,341 74,286 74,521
13.15 TRITURADO FINO 1/2 M3 ### 75,896 79,286 72,021 80,740 76,380 77,349
13.16 TRITURADO GRUESO 3/4 M3 ### 86,846 90,861 83,168 91,444 88,102 90,216
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 56,398 56,431 56,361 56,445 56,403 56,412
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ###
i 33,870 33,887 33,852 33,894 33,873 33,877
p
14.3 ADOQUÍN CONCRETO 6CM M2 ### i 63,546 63,628 63,454 63,662 63,558 63,581
14.4 ADOQUÍN CONCRETO 8CM M2 ### o 66,796 66,878 66,704 66,912 66,808 66,831
14.5 ADOQUÍN GRES PEATONAL M2 ### 71,072 71,153 70,979 71,188 71,083 71,106
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO
M2 ### 74,381 74,414 74,344 74,428 74,386 74,395
14.7 GRAVILLA PARA GRADAS ML ### 37,077 37,129 37,018 37,151 37,085 37,100
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 160,148 160,295 159,981 160,357 160,169 160,211
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 45,416 45,536 45,279 45,587 45,433 45,467
14.10 GUARDAESCOBA EN GRANITO ML ### 44,091 44,091 44,091 44,091 44,091 44,091
14.11 GUARDAESCOBA EN GRAVILLA ML ### 9,778 9,829 9,718 9,852 9,785 9,800
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,330 9,330 9,330 9,330 9,330 9,330
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,511 12,511 12,511 12,511 12,511 12,511
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,547 10,547 10,547 10,547 10,547 10,547
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,580 17,580 17,580 17,580 17,580 17,580
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,127 34,127 34,127 34,127 34,127 34,127
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,320 9,320 9,320 9,320 9,320 9,320
14.18 LISTÓN M.H. AMARILLO M2 ### 74,411 74,411 74,411 74,411 74,411 74,411
14.19 PASO ESCALERA GRANITO ML ### 116,324 116,437 116,194 116,486 116,340 116,372
14.20 PIRLANES ALUMINIO ML ### 7,642 7,642 7,642 7,642 7,642 7,642
14.21 PIRLANES LADRILLO ML ### 31,591 31,624 31,554 31,638 31,596 31,605
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 45,743 45,743 45,743 45,743 45,743 45,743
14.23 PISO VINILO TRÁFICO PESADO M2 ### 53,100 53,100 53,100 53,100 53,100 53,100
14.24 PULIDA LACADA PISO MADERA M2 ### 49,298 49,298 49,298 49,298 49,298 49,298
14.25 TABLETA DE GRES 25X25 M2 ### 48,870 48,902 48,833 48,916 48,875 48,884
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 54,876 54,908 54,839 54,922 54,881 54,890
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,030 11,030 11,030 11,030 11,030 11,030
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 48,659 48,707 48,603 48,728 48,666 48,680
14.29 JABONERA PORCELANA ACUARIO UN ### 20,569 20,569 20,569 20,569 20,569 20,569
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14.30 Y PERCHA SIMPLE) UN ### 122,853 122,853 122,853 122,853 122,853 122,853
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,032 10,032 10,032 10,032 10,032 10,032
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,485 22,485 22,485 22,485 22,485 22,485
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,497 14,497 14,497 14,497 14,497 14,497
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,090 14,090 14,090 14,090 14,090 14,090
14.35 REMATES BOCEL ALUMINIO ML ### 8,638 8,638 8,638 8,638 8,638 8,638
14.36 REMATES BOCEL PORCELANA ML ### 8,786 8,786 8,786 8,786 8,786 8,786
14.37 TAPA REGISTRO 20X20 UN ### 19,080 19,080 19,080 19,080 19,080 19,080
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
14.38 TAPA REGISTRO 6X6 UN ###
i 17,406 17,406 17,406 17,406 17,406 17,406
p
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### i 18,517 18,517 18,517 18,517 18,517 18,517
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO o
14.40 EN SITIO M2 ### 21,406 21,406 21,406 21,406 21,406 21,406
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 64,382 64,415 64,345 64,429 64,387 64,396
14.42 MEDIA CAÑA EN GRANITO ML ### 76,997 76,997 76,997 76,997 76,997 76,997
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,577 34,577 34,577 34,577 34,577 34,577
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,291 13,291 13,291 13,291 13,291 13,291
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 100,932 100,932 100,932 100,932 100,932 100,932
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 122,336 122,336 122,336 122,336 122,336 122,336
15 CIELO RASO
15.1 APLIQUE YESO ML ### 72,371 72,371 72,371 72,371 72,371 72,371
15.2 ARMADURA MADERA Y MALLA M2 ### 36,241 36,241 36,241 36,241 36,241 36,241
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 55,517 55,517 55,517 55,517 55,517 55,517
15.4 CIELO RASO DURACUSTIC M2 ### 67,982 67,982 67,982 67,982 67,982 67,982
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 50,797 50,797 50,797 50,797 50,797 50,797
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 93,914 93,914 93,914 93,914 93,914 93,914
15.7 CORNISAS YESO ML ### 48,539 48,539 48,539 48,539 48,539 48,539
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 103,672 103,672 103,672 103,672 103,672 103,672
15.9 MALLA CON VENA M2 ### 13,555 13,555 13,555 13,555 13,555 13,555
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 49,987 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 73,671 77,098 73,671 73,671 77,098 82,238
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 85,562 89,482 81,081 91,162 86,122 87,241
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 113,952 112,239 141,366 136,226 160,214 122,519
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 61,819 67,004 63,577 63,577 67,004 72,144
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ###
i 106,049 104,335 133,463 128,323 152,311 114,616
p
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### i 110,921 109,208 138,336 133,195 157,183 119,488
o
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 300,356 300,356 300,356 300,356 300,356 300,356
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 883,171 883,171 883,171 883,171 883,171 883,171
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 479,015 479,015 479,015 479,015 479,015 479,015
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 139,865 139,865 139,865 139,865 139,865 139,865
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 195,164 195,164 195,164 195,164 195,164 195,164
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 181,335 181,335 181,335 181,335 181,335 181,335
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 397,724 397,724 397,724 397,724 397,724 397,724
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,015,470 1,015,470 1,015,470 1,015,470 1,015,470 1,015,470
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 289,248 289,248 289,248 289,248 289,248 289,248
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 205,397 205,397 205,397 205,397 205,397 205,397
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,410 82,410 82,410 82,410 82,410 82,410
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 248,275 248,275 248,275 248,275 248,275 248,275
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 365,155 365,155 365,155 365,155 365,155 365,155
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,357 8,357 8,357 8,357 8,357 8,357
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,089 3,089 3,089 3,089 3,089 3,089
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,176 11,176 11,176 11,176 11,176 11,176
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,223 42,223 42,223 42,223 42,223 42,223
18.5 CARBURO SOBRE PAÑETES M2 ### 5,856 5,856 5,856 5,856 5,856 5,856
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 65,175 65,175 65,175 65,175 65,175 65,175
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,490 3,490 3,490 3,490 3,490 3,490
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,775 2,775 2,775 2,775 2,775 2,775
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 13,964 13,964 13,964 13,964 13,964 13,964
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,039 4,039 4,039 4,039 4,039 4,039
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,722 14,722 14,722 14,722 14,722 14,722
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,723 5,723 5,723 5,723 5,723 5,723
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,521 6,521 6,521 6,521 6,521 6,521
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
18.14 ESTUCO M2 ###
i 7,054 7,054 7,054 7,054 7,054 7,054
p
18.15 ESTUCO (LINEAL) ML ### i 4,422 4,422 4,422 4,422 4,422 4,422
18.16 ESTUCO Y VINILO 3 MANOS M2 ### o 15,555 15,555 15,555 15,555 15,555 15,555
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,656 9,656 9,656 9,656 9,656 9,656
18.18 LACA PISOS MADERA M2 ### 22,870 22,870 22,870 22,870 22,870 22,870
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,695 2,695 2,695 2,695 2,695 2,695
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,140 12,140 12,140 12,140 12,140 12,140
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,278 3,278 3,278 3,278 3,278 3,278
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,612 12,612 12,612 12,612 12,612 12,612
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,098 7,098 7,098 7,098 7,098 7,098
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,470 4,470 4,470 4,470 4,470 4,470
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,762 21,762 21,762 21,762 21,762 21,762
18.26 PINTURA EPÓXICA M2 ### 12,724 12,724 12,724 12,724 12,724 12,724
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,871 7,871 7,871 7,871 7,871 7,871
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,007,320 6,007,320 6,007,320 6,007,320 6,007,320 6,007,320
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR) UN ### 10,614,029 10,614,029 10,614,029 10,614,029 10,614,029 10,614,029
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,777,836 2,777,836 2,777,836 2,777,836 2,777,836 2,777,836
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,077,840 9,077,840 9,077,840 9,077,840 9,077,840 9,077,840
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,500,468 8,500,468 8,500,468 8,500,468 8,500,468 8,500,468
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,695 2,695 2,695 2,695 2,695 2,695
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 853,198 853,198 853,198 853,198 853,198 853,198
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 85,157 85,157 85,157 85,157 85,157 85,157
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,542,645 1,542,695 1,542,589 1,542,716 1,542,652 1,542,667
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 664,346 665,514 663,010 666,015 664,513 664,847
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 112,975 112,975 112,975 112,975 112,975 112,975
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,176,864 1,176,864 1,176,864 1,176,864 1,176,864 1,176,864
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 147,605 147,605 147,605 147,605 147,605 147,605
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,363,085 1,363,085 1,363,085 1,363,085 1,363,085 1,363,085
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 950,141 950,141 950,141 950,141 950,141 950,141
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,451 62,451 62,451 62,451 62,451 62,451
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 112,149 112,149 112,149 112,149 112,149 112,149
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 264,705 264,705 264,705 264,705 264,705 264,705
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 264,699 264,699 264,699 264,699 264,699 264,699
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 424,912 424,912 424,912 424,912 424,912 424,912
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 112,196 112,196 112,196 112,196 112,196 112,196
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 112,196 112,196 112,196 112,196 112,196 112,196
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 264,705 264,705 264,705 264,705 264,705 264,705
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 264,705 264,705 264,705 264,705 264,705 264,705
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 424,912 424,912 424,912 424,912 424,912 424,912
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 427,714 427,714 427,714 427,714 427,714 427,714
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 693,728 693,728 693,728 693,728 693,728 693,728
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,113,124 1,113,124 1,113,124 1,113,124 1,113,124 1,113,124
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 68,803 68,803 68,803 68,803 68,803 68,803
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 358,112 358,112 358,112 358,112 358,112 358,112
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 400,506 400,506 400,506 400,506 400,506 400,506
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,109,013 1,109,013 1,109,013 1,109,013 1,109,013 1,109,013
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 64,490 64,512 64,465 64,521 64,493 64,499
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 324,757 324,757 324,757 324,757 324,757 324,757
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 49,346 49,346 49,346 49,346 49,346 49,346
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 69,746 69,746 69,746 69,746 69,746 69,746
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 100,600 100,600 100,600 100,600 100,600 100,600
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 154,399 154,399 154,399 154,399 154,399 154,399
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 248,049 248,049 248,049 248,049 248,049 248,049
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 360,507 360,507 360,507 360,507 360,507 360,507
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 456,033 456,033 456,033 456,033 456,033 456,033
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 599,543 599,543 599,543 599,543 599,543 599,543
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 824,284 824,284 824,284 824,284 824,284 824,284
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 70,151 70,265 70,022 70,314 70,168 70,200
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 83,463 83,577 83,334 83,626 83,480 83,512
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 52,306 52,813 51,727 53,030 52,379 52,524
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###
i 56,920 57,411 56,359 57,621 56,990 57,130
p
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### i 57,188 57,665 56,642 57,870 57,256 57,392
5.6 BORDE SEPARADOR VERDE A-170 ML ### o 248,587 248,629 248,538 248,647 248,593 248,605
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 17,980 18,041 17,911 18,067 17,989 18,006
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 37,492 37,849 37,084 38,002 37,543 37,645
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 81,806 81,828 81,780 81,838 81,809 81,815
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 539,112 539,869 538,246 540,194 539,220 539,436
5.11 LOSETA PREFABRICADA A-40 M2 ### 59,601 59,697 59,490 59,739 59,615 59,642
5.12 LOSETA PREFABRICADA A-60 M2 ### 87,158 87,254 87,047 87,296 87,171 87,199
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 31,871 32,067 31,647 32,152 31,899 31,955
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 50,694 51,091 50,239 51,261 50,750 50,864
5.15 SARDINEL PREFABRICADO A-10 ML ### 92,543 92,367 95,701 95,162 97,919 93,548
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 58,152 58,210 58,085 58,235 58,160 58,177
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 198,506 198,740 198,239 198,840 198,540 198,606
6.2 BANCA EN CONCRETO M-30 UN ### 653,233 653,560 652,859 653,701 653,280 653,373
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 211,262 211,311 211,205 211,332 211,269 211,283
6.4 BOLARDO M-60 CONCRETO UN ### 158,077 158,357 157,756 158,478 158,117 158,197
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 159,945 160,225 159,624 160,345 159,985 160,065
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 187,521 187,816 187,184 187,942 187,563 187,647
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 56,530 56,617 56,431 56,654 56,542 56,567
6.8 BORDILLO PREFABRICADO A-80 ML ### 65,012 65,109 64,900 65,151 65,026 65,053
6.9 CANECA M-120 UN ### 305,959 305,981 305,934 305,990 305,962 305,968
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 807,445 807,585 807,284 807,645 807,465 807,505
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,311,664 3,311,757 3,311,557 3,311,797 3,311,677 3,311,704
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,406,723 3,406,816 3,406,616 3,406,856 3,406,736 3,406,763
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 476,028 476,126 475,916 476,168 476,042 476,070
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 629,078 629,471 628,629 629,640 629,134 629,247
6.15 BANCA EN MADERA M-50 UN ### 524,692 524,692 524,692 524,692 524,692 524,692
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 243,300 243,440 243,140 243,501 243,320 243,360
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 563,405 563,459 563,343 563,482 563,413 563,428
6.18 POSTE HISTÓRICO M-131 UN ### 6,291,973 6,292,675 6,291,172 6,292,975 6,292,074 6,292,274
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,958 3,958 3,958 3,958 3,958 3,958
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,701 42,701 42,701 42,701 42,701 42,701
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
7.3 SEÑAL DOBLE DE CICLORUTA UN ###
i 307,418 307,440 307,394 307,449 307,421 307,427
p
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### i 484,370 484,567 484,146 484,651 484,398 484,454
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### o 230,843 230,864 230,818 230,873 230,846 230,852
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 245,105 245,126 245,080 245,135 245,108 245,114
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 255,906 255,927 255,881 255,936 255,909 255,915
7.8 TACHAS REFLECTIVAS UN ### 13,327 13,327 13,327 13,327 13,327 13,327
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,227 14,227 14,227 14,227 14,227 14,227
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 115,547 115,547 115,547 115,547 115,547 115,547
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES
1.2 201 P A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO
1.4 200.2 DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.5 201.7 UNA DISTANCIA DE 5KM)
M3 ### 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318
2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,105 35,105 35,105 35,105 35,105 35,105
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832 12,832 12,832
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,677,800 1,682,475 1,672,457 1,684,479 1,678,468 1,679,804
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,148 14,148 14,148 14,148 14,148 14,148
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,016 19,016 19,016 19,016 19,016 19,016
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 22,780 22,780 22,780 22,780 22,780 22,780
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 29,251 29,251 29,251 29,251 29,251 29,251
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,
4.40 *** FILTRO Y SEPARACIÓN) M2 ### 7,137 7,137 7,137 7,137 7,137 7,137
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,
4.41 *** FILTRO Y SEPARACIÓN) M2 ### 8,126 8,126 8,126 8,126 8,126 8,126
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,196 15,196 15,196 15,196 15,196 15,196
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,534 24,534 24,534 24,534 24,534 24,534
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,386 9,386 9,386 9,386 9,386 9,386
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
CONSTRUCCIÓN
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 89,477 84,337 74,080 77,483 74,056 74,056 74,056
2.2 BASE ARENA CEMENTO 1:20 M3 ### 223,258 254,928 224,351 214,522 237,455 230,904 235,272
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,077 22,077 22,077 22,077 22,077 22,077 22,077
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 650,359 681,659 651,439 641,726 664,390 657,914 662,231
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 652,363 684,678 653,478 643,449 666,849 660,164 664,621
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 607,777 638,036 608,821 599,430 621,342 615,081 619,255
2.9 PILOTE DE MADERA D=20 CM ML ### 49,656 49,656 49,656 49,656 49,656 49,656 49,656
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM)
ML ### 153,134 153,134 153,134 153,134 153,134 153,134 153,134
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2.11 UNA DISTANCIA MENOR DE 5 KM) ML ### 190,916 190,916 190,916 190,916 190,916 190,916 190,916
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2.12 UNA DISTANCIA MENOR DE 5 KM) ML ### 236,606 236,606 236,606 236,606 236,606 236,606 236,606
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2.13 UNA DISTANCIA MENOR DE 5 KM)
ML ### 298,111 298,111 298,111 298,111 298,111 298,111 298,111
2.14 PILOTE HINCADO 25X25 ML ### 105,404 107,595 105,479 104,800 106,386 105,933 106,235
2.15 PILOTE HINCADO 30X30 ML ### 130,180 133,355 130,290 129,305 131,604 130,947 131,385
2.16 DADOS EN CONCRETO 3500PSI M3 ### 593,628 623,887 594,672 585,281 607,192 600,932 605,106
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM) ML ### 91,623 91,623 91,623 91,623 91,623 91,623 91,623
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,120 42,120 42,120 42,120 42,120 42,120 42,120
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 55,580 55,580 55,580 55,580 55,580 55,580 55,580
4.3 COLUMNAS 3500 PSI M3 ### 813,624 843,882 814,667 805,277 827,188 820,928 825,101
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 265,409 283,161 263,139 257,241 266,824 266,235 264,678
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4.5 DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 99,056 101,993 99,157 98,245 100,373 99,765 100,170
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
4.6 DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 116,817 120,342 116,938 115,844 118,397 117,668 118,154
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO) M2 ### 130,752 135,452 130,914 129,455 132,859 131,886 132,534
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 137,963 142,957 138,135 136,585 140,202 139,168 139,857
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 158,170 164,339 158,382 156,468 160,935 159,659 160,510
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### p 175,965 183,015 176,208 174,020 179,125 177,667 178,639
i
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN o
4.11 REFUERZO) M2 ### 195,321 203,252 195,594 193,132 198,876 197,235 198,329
4.12 ENTREPISO VIGUETA PLACA M2 ### 99,397 99,884 99,414 99,262 99,615 99,514 99,582
4.13 ESCALERA MACIZA 3500 PSI M3 ### 961,169 991,427 962,212 952,822 974,733 968,473 972,646
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 95,147 95,550 95,161 95,035 95,328 95,244 95,300
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 80,078 83,104 80,182 79,243 81,434 80,808 81,226
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 90,141 93,842 90,268 89,119 91,800 91,034 91,545
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 105,118 109,759 105,278 103,838 107,199 106,238 106,879
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 713,231 743,489 714,274 704,884 726,795 720,534 724,708
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4.19 M) UN ### 49,605 50,532 49,637 49,349 50,020 49,829 49,957
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 284,766 298,280 285,232 281,039 290,824 288,028 289,892
4.21 ACERO FIGURADO 37000 PSI KG ### 4,179 4,179 4,179 4,179 4,179 4,179 4,179
4.22 ACERO FIGURADO 60000 PSI KG ### 4,382 4,382 4,382 4,382 4,382 4,382 4,382
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,158 6,158 6,158 6,158 6,158 6,158 6,158
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 860,164 890,423 861,208 851,817 873,728 867,468 871,642
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 785,256 818,376 786,398 776,119 800,103 793,251 797,819
4.26 VIGA AÉREA 3500 PSI M3 ### 854,071 884,329 855,114 845,723 867,635 861,374 865,548
4.27 VIGA CINTA 3500 PSI M3 ### 833,989 864,247 835,032 825,642 847,553 841,293 845,466
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,044,452 1,074,710 1,045,495 1,036,105 1,058,016 1,051,755 1,055,929
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 332,111 365,907 333,277 322,788 347,261 340,268 344,930
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,032 30,847 30,060 29,808 30,397 30,229 30,341
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 50,410 51,224 50,438 50,185 50,775 50,606 50,719
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,219 35,415 35,225 35,164 35,307 35,266 35,293
5.4 ARCOS EN LADRILLO PRENSADO ML ### 164,390 164,783 164,403 164,281 164,566 164,485 164,539
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,398 45,324 44,430 44,142 44,813 44,621 44,749
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,245 27,648 27,259 27,133 27,426 27,342 27,398
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 99,695 100,482 99,723 99,478 100,048 99,885 99,994
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 91,677 94,766 91,783 90,825 93,062 92,423 92,849
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 91,425 91,425 91,425 91,425 91,425 91,425 91,425
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,636 53,636 53,636 53,636 53,636 53,636 53,636
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 88,055 88,055 88,055 88,055 88,055 88,055 88,055
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,951 51,951 51,951 51,951 51,951 51,951 51,951
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ###
i 102,043 102,043 102,043 102,043 102,043 102,043 102,043
p
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### i 60,266 60,266 60,266 60,266 60,266 60,266 60,266
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### o 113,479 113,479 113,479 113,479 113,479 113,479 113,479
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 65,985 65,985 65,985 65,985 65,985 65,985 65,985
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 41,078 41,473 41,092 40,969 41,255 41,174 41,228
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,853 25,050 24,860 24,798 24,941 24,901 24,928
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 53,277 53,541 53,286 53,205 53,395 53,341 53,377
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,018 32,150 32,022 31,982 32,077 32,050 32,068
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,906 60,170 59,915 59,834 60,025 59,970 60,006
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,006 36,138 36,010 35,970 36,065 36,038 36,056
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 100,308 101,626 100,353 99,944 100,898 100,626 100,808
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 59,233 59,892 59,256 59,051 59,528 59,392 59,483
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,569 37,833 37,578 37,496 37,687 37,633 37,669
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,765 22,897 22,770 22,729 22,824 22,797 22,815
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 74,729 75,257 74,748 74,584 74,966 74,857 74,929
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,026 45,289 45,035 44,953 45,144 45,090 45,126
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 88,156 88,560 88,170 88,045 88,337 88,254 88,309
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,417 53,618 53,424 53,361 53,507 53,465 53,493
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 183,555 185,400 183,618 183,046 184,382 184,000 184,255
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 110,171 111,094 110,203 109,917 110,585 110,394 110,521
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 90,115 90,880 90,142 89,905 90,458 90,300 90,405
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,396 54,778 54,409 54,291 54,567 54,488 54,541
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 47,434 48,024 47,454 47,271 47,698 47,576 47,658
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,815 29,110 28,826 28,734 28,948 28,887 28,927
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 34,063 34,326 34,072 33,990 34,181 34,126 34,163
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,737 20,869 20,742 20,701 20,796 20,769 20,787
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 51,542 52,069 51,560 51,396 51,778 51,669 51,742
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,552 31,815 31,561 31,479 31,670 31,615 31,652
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 99,214 100,005 99,242 98,996 99,569 99,405 99,514
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,355 60,751 60,369 60,246 60,533 60,451 60,505
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 72,366 72,893 72,384 72,221 72,603 72,494 72,566
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,666 43,930 43,675 43,593 43,784 43,730 43,766
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 152,754 154,599 152,817 152,245 153,581 153,199 153,454
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 92,770 93,693 92,802 92,516 93,184 92,993 93,120
5.47 REMATES LADRILLO PRENSADO ML ### 31,959 32,155 31,966 31,904 32,047 32,006 32,033
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,634 37,184 36,653 36,483 36,881 36,767 36,843
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,809 62,542 61,834 61,606 62,137 61,986 62,087
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
5.50 LAVADA DE FACHADA M2 ###
i 5,247 5,247 5,247 5,247 5,247 5,247 5,247
p
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### i 50,771 51,586 50,799 50,546 51,136 50,968 51,080
5.52 DOVELA, GROUTING 3000 PSI ML ### o 10,604 10,604 10,604 10,604 10,604 10,604 10,604
5.53 ANCLAJE 3/8" L=30CM UN ### 13,975 13,975 13,975 13,975 13,975 13,975 13,975
5.54 ANCLAJE 1/2" L=50CM UN ### 18,250 18,250 18,250 18,250 18,250 18,250 18,250
5.55 ANCLAJE 5/8" L=70CM UN ### 25,487 25,487 25,487 25,487 25,487 25,487 25,487
5.56 ANCLAJE 3/4" L=70CM UN ### 37,921 37,921 37,921 37,921 37,921 37,921 37,921
5.57 ANCLAJE 1" L= 70CM UN ### 4,992 5,219 5,000 4,930 5,094 5,047 5,078
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 460,599 492,348 461,694 451,841 474,831 468,262 472,642
8.2 CONCRETO 3500 PSI M3 ### 403,570 432,947 404,583 395,466 416,739 410,661 414,713
8.3 CONCRETO 3000 PSI M3 ### 402,538 432,926 403,586 394,156 416,160 409,873 414,064
8.4 CONCRETO 2500 PSI M3 ### 357,715 388,606 358,781 349,194 371,563 365,172 369,433
8.5 CONCRETO 2000 PSI M3 ### 335,517 367,318 336,614 326,745 349,773 343,193 347,580
8.6 CONCRETO 1500 PSI M3 ### 307,327 340,139 308,459 298,276 322,036 315,247 319,773
8.7 MORTERO SECO 1:10 M3 ### 261,998 289,144 262,935 254,510 274,167 268,551 272,295
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 471,808 498,167 472,717 464,537 483,624 478,171 481,807
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 424,448 449,921 425,326 417,421 435,867 430,597 434,110
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 484,554 508,377 485,375 477,982 495,233 490,305 493,590
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 709,314 733,137 710,135 702,742 719,993 715,065 718,350
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 123,075 123,075 123,075 123,075 123,075 123,075 123,075
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,141 4,338 4,148 4,087 4,229 4,188 4,215
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 137,913 137,913 137,913 137,913 137,913 137,913 137,913
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 168,681 168,681 168,681 168,681 168,681 168,681 168,681
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 244,386 244,386 244,386 244,386 244,386 244,386 244,386
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 271,959 271,959 271,959 271,959 271,959 271,959 271,959
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 299,563 299,563 299,563 299,563 299,563 299,563 299,563
9.8 HOJA PUERTA FORTEC 0.81 UN ### 198,825 198,825 198,825 198,825 198,825 198,825 198,825
9.9 HOJA PUERTA FORTEC 0.91 UN ### 225,367 225,367 225,367 225,367 225,367 225,367 225,367
9.10 HOJA PUERTA FORTEC 1.50 UN ### 331,534 331,534 331,534 331,534 331,534 331,534 331,534
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 125,835 125,835 125,835 125,835 125,835 125,835 125,835
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 166,975 166,975 166,975 166,975 166,975 166,975 166,975
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ###
i 185,554 185,554 185,554 185,554 185,554 185,554 185,554
p
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### i 472,207 472,207 472,207 472,207 472,207 472,207 472,207
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### o 42,118 42,118 42,118 42,118 42,118 42,118 42,118
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,343 26,343 26,343 26,343 26,343 26,343 26,343
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 99,590 99,590 99,590 99,590 99,590 99,590 99,590
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 120,869 120,869 120,869 120,869 120,869 120,869 120,869
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,929 93,929 93,929 93,929 93,929 93,929 93,929
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,220 29,220 29,220 29,220 29,220 29,220 29,220
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,220 29,220 29,220 29,220 29,220 29,220 29,220
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,707 27,707 27,707 27,707 27,707 27,707 27,707
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,415 42,415 42,415 42,415 42,415 42,415 42,415
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,468 52,468 52,468 52,468 52,468 52,468 52,468
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,191 63,191 63,191 63,191 63,191 63,191 63,191
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,924 75,924 75,924 75,924 75,924 75,924 75,924
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 356,881 356,881 356,881 356,881 356,881 356,881 356,881
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 249,652 249,652 249,652 249,652 249,652 249,652 249,652
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,703 33,703 33,703 33,703 33,703 33,703 33,703
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 43,085 43,085 43,085 43,085 43,085 43,085 43,085
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,468 52,468 52,468 52,468 52,468 52,468 52,468
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,872 65,872 65,872 65,872 65,872 65,872 65,872
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 76,074 76,074 76,074 76,074 76,074 76,074 76,074
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 210,859 210,859 210,859 210,859 210,859 210,859 210,859
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO) ML ### 80,660 80,660 80,660 80,660 80,660 80,660 80,660
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,762 144,762 144,762 144,762 144,762 144,762 144,762
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 136,622 136,622 136,622 136,622 136,622 136,622 136,622
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,707 89,707 89,707 89,707 89,707 89,707 89,707
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 211,196 211,196 211,196 211,196 211,196 211,196 211,196
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 110,141 110,141 110,141 110,141 110,141 110,141 110,141
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,616 6,616 6,616 6,616 6,616 6,616 6,616
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 99,907 99,907 99,907 99,907 99,907 99,907 99,907
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA)
10,10(1) H: 2.00 MTS
M2 ### 120,872 120,872 120,872 120,872 120,872 120,872 120,872
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,121 41,121 41,121 41,121 41,121 41,121 41,121
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### p 537,349 537,349 537,349 537,349 537,349 537,349 537,349
i
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### o 193,504 193,504 193,504 193,504 193,504 193,504 193,504
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA M2 ### 217,620 217,620 217,620 217,620 217,620 217,620 217,620
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 61,915 61,915 61,915 61,915 61,915 61,915 61,915
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,166 62,166 62,166 62,166 62,166 62,166 62,166
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 40,001 40,001 40,001 40,001 40,001 40,001 40,001
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 49,238 49,238 49,238 49,238 49,238 49,238 49,238
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE
11.57 HASTA 2" ML ### 4,165 4,165 4,165 4,165 4,165 4,165 4,165
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A
11.58 2" ML ### 6,557 6,557 6,557 6,557 6,557 6,557 6,557
11.59 GABINETE TIPO III UN ### 1,013,971 1,013,971 1,013,971 1,013,971 1,013,971 1,013,971 1,013,971
11.60 GABINETE TIPO I UN ### 775,359 775,359 775,359 775,359 775,359 775,359 775,359
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,598,608 2,598,608 2,598,608 2,598,608 2,598,608 2,598,608 2,598,608
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,166,952 2,166,952 2,166,952 2,166,952 2,166,952 2,166,952 2,166,952
11.63 VÁLVULA MARIPOSA 3" UN ### 631,026 631,026 631,026 631,026 631,026 631,026 631,026
11.64 VÁLVULA MARIPOSA 4" UN ### 815,757 815,757 815,757 815,757 815,757 815,757 815,757
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 313,250 313,250 313,250 313,250 313,250 313,250 313,250
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 363,108 363,108 363,108 363,108 363,108 363,108 363,108
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ###
i 57,691 57,691 57,691 57,691 57,691 57,691 57,691
p
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### i 68,255 68,255 68,255 68,255 68,255 68,255 68,255
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### o 75,833 75,833 75,833 75,833 75,833 75,833 75,833
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 89,263 89,263 89,263 89,263 89,263 89,263 89,263
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,261 54,261 54,261 54,261 54,261 54,261 54,261
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,833 61,833 61,833 61,833 61,833 61,833 61,833
12.8 STRIP TELEFÓNICO 10 PARES UN ### 142,980 142,980 142,980 142,980 142,980 142,980 142,980
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 55,700 55,700 55,700 55,700 55,700 55,700 55,700
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 127,950 127,950 127,950 127,950 127,950 127,950 127,950
12.11 SALIDA T.V PVC COMPLETA. UN ### 76,565 76,565 76,565 76,565 76,565 76,565 76,565
12.12 SALIDA BIFÁSICA C.N. UN ### 45,395 45,395 45,395 45,395 45,395 45,395 45,395
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,792 95,792 95,792 95,792 95,792 95,792 95,792
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 409,127 409,127 409,127 409,127 409,127 409,127 409,127
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 544,712 544,712 544,712 544,712 544,712 544,712 544,712
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,526 3,526 3,526 3,526 3,526 3,526 3,526
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,658 4,658 4,658 4,658 4,658 4,658 4,658
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,243 7,243 7,243 7,243 7,243 7,243 7,243
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,958 12,958 12,958 12,958 12,958 12,958 12,958
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 272,148 272,148 272,148 272,148 272,148 272,148 272,148
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,978 76,978 76,978 76,978 76,978 76,978 76,978
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 104,075 104,075 104,075 104,075 104,075 104,075 104,075
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,696 42,696 42,696 42,696 42,696 42,696 42,696
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,397,059 1,397,059 1,397,059 1,397,059 1,397,059 1,397,059 1,397,059
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,035,471 1,035,471 1,035,471 1,035,471 1,035,471 1,035,471 1,035,471
12.26 POSTE METÁLICO 6M UN ### 1,290,877 1,290,877 1,290,877 1,290,877 1,290,877 1,290,877 1,290,877
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 599,968 599,968 599,968 599,968 599,968 599,968 599,968
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 109,824 109,824 109,824 109,824 109,824 109,824 109,824
12.29 LUMINARIA 70W SODIO UN ### 503,291 503,291 503,291 503,291 503,291 503,291 503,291
12.30 LUMINARIA 150W SODIO UN ### 629,532 629,532 629,532 629,532 629,532 629,532 629,532
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,661,945 1,661,945 1,661,945 1,661,945 1,661,945 1,661,945 1,661,945
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,224,005 1,224,005 1,224,005 1,224,005 1,224,005 1,224,005 1,224,005
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 40,182 41,098 40,214 39,929 40,593 40,403 40,530
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,811 40,727 39,842 39,558 40,221 40,032 40,158
13.3 ALISTADO PARA LISTÓN M2 ### 14,854 15,037 14,860 14,803 14,936 14,898 14,924
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 28,796 30,629 28,859 28,291 29,618 29,239 29,491
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ###
i 85,704 87,537 85,768 85,199 86,526 86,147 86,400
p
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### i 26,964 27,600 26,986 26,789 27,249 27,118 27,205
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### o 58,509 61,598 58,616 57,657 59,894 59,255 59,681
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 81,190 86,132 81,360 79,827 83,406 82,383 83,065
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,447 30,447 30,447 30,447 30,447 30,447 30,447
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,113 23,113 23,113 23,113 23,113 23,113 23,113
13.11 PERMA PLY 2 CAPAS M2 ### 27,155 27,155 27,155 27,155 27,155 27,155 27,155
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 47,658 50,438 47,754 46,891 48,904 48,329 48,712
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 55,854 59,252 55,971 54,916 57,377 56,674 57,143
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 80,981 86,233 81,162 79,532 83,335 82,249 82,973
13.15 TRITURADO FINO 1/2 M3 ### 111,563 135,708 112,397 104,903 122,387 117,391 120,722
13.16 TRITURADO GRUESO 3/4 M3 ### 109,336 128,136 107,240 101,035 114,717 110,580 113,338
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,624 57,990 57,636 57,522 57,788 57,712 57,763
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,483 34,666 34,489 34,433 34,565 34,527 34,553
14.3 ADOQUÍN CONCRETO 6CM M2 ### 66,060 66,976 66,091 65,807 66,470 66,281 66,407
14.4 ADOQUÍN CONCRETO 8CM M2 ### 69,360 70,276 69,391 69,107 69,770 69,581 69,707
14.5 ADOQUÍN GRES PEATONAL M2 ### 73,661 74,577 73,692 73,408 74,071 73,882 74,008
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO M2 ### 75,807 76,173 75,819 75,706 75,971 75,895 75,946
14.7 GRAVILLA PARA GRADAS ML ### 37,800 38,211 37,815 37,687 37,984 37,899 37,956
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 165,234 166,883 165,290 164,779 165,973 165,632 165,859
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 47,301 48,305 47,336 47,024 47,751 47,543 47,682
14.10 GUARDAESCOBA EN GRANITO ML ### 44,257 44,257 44,257 44,257 44,257 44,257 44,257
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,481 10,891 10,495 10,368 10,665 10,580 10,637
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,415 9,415 9,415 9,415 9,415 9,415 9,415
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,629 12,629 12,629 12,629 12,629 12,629 12,629
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,609 10,609 10,609 10,609 10,609 10,609 10,609
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,715 17,715 17,715 17,715 17,715 17,715 17,715
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,436 34,436 34,436 34,436 34,436 34,436 34,436
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,339 9,339 9,339 9,339 9,339 9,339 9,339
14.18 LISTÓN M.H. AMARILLO M2 ### 74,900 74,900 74,900 74,900 74,900 74,900 74,900
14.19 PASO ESCALERA GRANITO ML ### 119,937 121,220 119,981 119,583 120,512 120,247 120,423
14.20 PIRLANES ALUMINIO ML ### 7,651 7,651 7,651 7,651 7,651 7,651 7,651
14.21 PIRLANES LADRILLO ML ### 32,655 33,048 32,669 32,547 32,831 32,750 32,804
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ###
i 46,117 46,117 46,117 46,117 46,117 46,117 46,117
p
14.23 PISO VINILO TRÁFICO PESADO M2 ### i 53,556 53,556 53,556 53,556 53,556 53,556 53,556
14.24 PULIDA LACADA PISO MADERA M2 ### o 49,580 49,580 49,580 49,580 49,580 49,580 49,580
14.25 TABLETA DE GRES 25X25 M2 ### 50,028 50,395 50,041 49,927 50,192 50,117 50,167
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,097 56,463 56,110 55,996 56,261 56,185 56,236
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,067 11,067 11,067 11,067 11,067 11,067 11,067
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 50,387 50,977 50,407 50,224 50,651 50,529 50,610
14.29 JABONERA PORCELANA ACUARIO UN ### 20,729 20,729 20,729 20,729 20,729 20,729 20,729
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE)
UN ### 123,901 123,901 123,901 123,901 123,901 123,901 123,901
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,065 10,065 10,065 10,065 10,065 10,065 10,065
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,648 22,648 22,648 22,648 22,648 22,648 22,648
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,576 14,576 14,576 14,576 14,576 14,576 14,576
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,165 14,165 14,165 14,165 14,165 14,165 14,165
14.35 REMATES BOCEL ALUMINIO ML ### 8,659 8,659 8,659 8,659 8,659 8,659 8,659
14.36 REMATES BOCEL PORCELANA ML ### 8,809 8,809 8,809 8,809 8,809 8,809 8,809
14.37 TAPA REGISTRO 20X20 UN ### 19,207 19,207 19,207 19,207 19,207 19,207 19,207
14.38 TAPA REGISTRO 6X6 UN ### 17,515 17,515 17,515 17,515 17,515 17,515 17,515
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL
14.39 N.5 M2 ### 18,712 18,712 18,712 18,712 18,712 18,712 18,712
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 65,737 66,103 65,749 65,635 65,901 65,825 65,876
14.42 MEDIA CAÑA EN GRANITO ML ### 77,730 77,730 77,730 77,730 77,730 77,730 77,730
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,614 34,614 34,614 34,614 34,614 34,614 34,614
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,374 13,374 13,374 13,374 13,374 13,374 13,374
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 101,969 101,969 101,969 101,969 101,969 101,969 101,969
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 123,539 123,539 123,539 123,539 123,539 123,539 123,539
15 CIELO RASO
15.1 APLIQUE YESO ML ### 73,049 73,049 73,049 73,049 73,049 73,049 73,049
15.2 ARMADURA MADERA Y MALLA M2 ### 36,354 36,354 36,354 36,354 36,354 36,354 36,354
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 55,861 55,861 55,861 55,861 55,861 55,861 55,861
15.4 CIELO RASO DURACUSTIC M2 ### 68,456 68,456 68,456 68,456 68,456 68,456 68,456
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,130 51,130 51,130 51,130 51,130 51,130 51,130
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 94,636 94,636 94,636 94,636 94,636 94,636 94,636
15.7 CORNISAS YESO ML ### 49,008 49,008 49,008 49,008 49,008 49,008 49,008
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ###
i 104,520 104,520 104,520 104,520 104,520 104,520 104,520
p
15.9 MALLA CON VENA M2 ### i 13,600 13,600 13,600 13,600 13,600 13,600 13,600
o
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
16.2 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 43,707 43,707 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 77,183 72,043 65,189 65,189 61,762 61,762 61,762
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 115,910 140,902 116,772 109,016 127,113 121,942 125,389
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 166,560 161,420 154,567 154,567 151,140 151,140 151,140
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 79,383 74,243 63,986 67,389 63,962 63,962 63,962
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 154,593 149,453 142,600 142,600 139,173 139,173 139,173
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 163,530 158,389 151,536 151,536 148,109 148,109 148,109
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 303,066 303,066 303,066 303,066 303,066 303,066 303,066
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 GRIFERÍA) UN ### 891,968 891,968 891,968 891,968 891,968 891,968 891,968
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 483,606 483,606 483,606 483,606 483,606 483,606 483,606
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE
17.4 GRIFERÍA) UN ### 140,834 140,834 140,834 140,834 140,834 140,834 140,834
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE
17.5 GRIFERÍA)
UN ### 196,765 196,765 196,765 196,765 196,765 196,765 196,765
SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
17.6 GRIFERÍA) UN ### 182,791 182,791 182,791 182,791 182,791 182,791 182,791
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 401,459 401,459 401,459 401,459 401,459 401,459 401,459
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
17.8 GRIFERÍA)
UN ### p 1,025,661 1,025,661 1,025,661 1,025,661 1,025,661 1,025,661 1,025,661
i
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### o 291,841 291,841 291,841 291,841 291,841 291,841 291,841
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A
17.10 BAÑERA UN ### 207,056 207,056 207,056 207,056 207,056 207,056 207,056
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,823 82,823 82,823 82,823 82,823 82,823 82,823
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 250,435 250,435 250,435 250,435 250,435 250,435 250,435
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 368,546 368,546 368,546 368,546 368,546 368,546 368,546
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,396 8,396 8,396 8,396 8,396 8,396 8,396
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,107 3,107 3,107 3,107 3,107 3,107 3,107
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,210 11,210 11,210 11,210 11,210 11,210 11,210
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,463 42,463 42,463 42,463 42,463 42,463 42,463
18.5 CARBURO SOBRE PAÑETES M2 ### 5,875 5,875 5,875 5,875 5,875 5,875 5,875
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 65,805 65,805 65,805 65,805 65,805 65,805 65,805
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,498 3,498 3,498 3,498 3,498 3,498 3,498
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,790 2,790 2,790 2,790 2,790 2,790 2,790
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,025 14,025 14,025 14,025 14,025 14,025 14,025
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,059 4,059 4,059 4,059 4,059 4,059 4,059
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,786 14,786 14,786 14,786 14,786 14,786 14,786
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,765 5,765 5,765 5,765 5,765 5,765 5,765
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,564 6,564 6,564 6,564 6,564 6,564 6,564
18.14 ESTUCO M2 ### 7,072 7,072 7,072 7,072 7,072 7,072 7,072
18.15 ESTUCO (LINEAL) ML ### 4,431 4,431 4,431 4,431 4,431 4,431 4,431
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,617 15,617 15,617 15,617 15,617 15,617 15,617
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,687 9,687 9,687 9,687 9,687 9,687 9,687
18.18 LACA PISOS MADERA M2 ### 22,931 22,931 22,931 22,931 22,931 22,931 22,931
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,704 2,704 2,704 2,704 2,704 2,704 2,704
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,221 12,221 12,221 12,221 12,221 12,221 12,221
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,299 3,299 3,299 3,299 3,299 3,299 3,299
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,670 12,670 12,670 12,670 12,670 12,670 12,670
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,128 7,128 7,128 7,128 7,128 7,128 7,128
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,484 4,484 4,484 4,484 4,484 4,484 4,484
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ###
i 21,901 21,901 21,901 21,901 21,901 21,901 21,901
p
18.26 PINTURA EPÓXICA M2 ### i 12,767 12,767 12,767 12,767 12,767 12,767 12,767
18.27 PINTURA EPÓXICA (LINEAL) ML ### o 7,893 7,893 7,893 7,893 7,893 7,893 7,893
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,069,901 6,069,901 6,069,901 6,069,901 6,069,901 6,069,901 6,069,901
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,724,588 ### 10,724,588 10,724,588 ### 10,724,588 10,724,588
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,806,719 2,806,719 2,806,719 2,806,719 2,806,719 2,806,719 2,806,719
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,172,351 9,172,351 9,172,351 9,172,351 9,172,351 9,172,351 9,172,351
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,589,236 8,589,236 8,589,236 8,589,236 8,589,236 8,589,236 8,589,236
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,704 2,704 2,704 2,704 2,704 2,704 2,704
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 861,798 861,798 861,798 861,798 861,798 861,798 861,798
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 86,054 86,054 86,054 86,054 86,054 86,054 86,054
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,559,009 1,559,327 1,559,020 1,558,921 1,559,151 1,559,086 1,559,130
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 679,399 686,996 679,661 677,303 682,804 681,232 682,280
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,202 29,202 29,202 29,202 29,202 29,202 29,202
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,194 26,194 26,194 26,194 26,194 26,194 26,194
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,613 27,613 27,613 27,613 27,613 27,613 27,613
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,517 34,517 34,517 34,517 34,517 34,517 34,517
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,677 17,677 17,677 17,677 17,677 17,677 17,677
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,164 23,164 23,164 23,164 23,164 23,164 23,164
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,615 35,615 35,615 35,615 35,615 35,615 35,615
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 272,884 272,884 272,884 272,884 272,884 272,884 272,884
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 314,040 314,040 314,040 314,040 314,040 314,040 314,040
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 327,561 327,561 327,561 327,561 327,561 327,561 327,561
20.16 ACOMETIDA GAS 1/2" ML ### 303,971 303,971 303,971 303,971 303,971 303,971 303,971
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
21.1 INSTALACIONES RED VOZ Y DATOS
i
p
21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### i 221,894 221,894 221,894 221,894 221,894 221,894 221,894
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### o 33,986 33,986 33,986 33,986 33,986 33,986 33,986
21.3 SIRENA DE 110 V UN ### 103,669 103,669 103,669 103,669 103,669 103,669 103,669
21.4 CÁMARA CCTV UN ### 263,881 263,881 263,881 263,881 263,881 263,881 263,881
21.5 PARLANTE-CIELO FALSO UN ### 52,164 52,164 52,164 52,164 52,164 52,164 52,164
21.6 AMPLIFICADOR 100W UN ### 574,015 574,015 574,015 574,015 574,015 574,015 574,015
21.7 AMPLIFICADOR 300W UN ### 1,421,949 1,421,949 1,421,949 1,421,949 1,421,949 1,421,949 1,421,949
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,129 45,129 45,129 45,129 45,129 45,129 45,129
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 221,867 221,867 221,867 221,867 221,867 221,867 221,867
21.10 TOMA PARA MICRÓFONO UN ### 44,156 44,156 44,156 44,156 44,156 44,156 44,156
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,770 3,770 3,770 3,770 3,770 3,770 3,770
21.12 SPLITERS UN ### 6,323 6,323 6,323 6,323 6,323 6,323 6,323
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,737 18,737 18,737 18,737 18,737 18,737 18,737
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,542 24,542 24,542 24,542 24,542 24,542 24,542
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 31,848 31,848 31,848 31,848 31,848 31,848 31,848
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 122,938 122,938 122,938 122,938 122,938 122,938 122,938
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,079 32,079 32,079 32,079 32,079 32,079 32,079
21.18 BANDEJA PORTACABLES PARA RACK UN ### 104,825 104,825 104,825 104,825 104,825 104,825 104,825
21.19 RACK 2' X 24" UN ### 184,512 184,512 184,512 184,512 184,512 184,512 184,512
21.20 RACK 3' X 24" UN ### 289,353 289,353 289,353 289,353 289,353 289,353 289,353
21.21 RACK 5' X 24" UN ### 359,711 359,711 359,711 359,711 359,711 359,711 359,711
21.22 RACK 7' X 24" UN ### 392,888 392,888 392,888 392,888 392,888 392,888 392,888
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 576,229 576,229 576,229 576,229 576,229 576,229 576,229
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 339,694 339,694 339,694 339,694 339,694 339,694 339,694
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 104,213 104,213 104,213 104,213 104,213 104,213 104,213
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 13,866 13,866 13,866 13,866 13,866 13,866 13,866
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,332 28,332 28,332 28,332 28,332 28,332 28,332
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,018 5,018 5,018 5,018 5,018 5,018 5,018
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,393 35,393 35,393 35,393 35,393 35,393 35,393
21.30 CANALETA METÁLICA 4X10 CMS ML ### 36,974 36,974 36,974 36,974 36,974 36,974 36,974
21.31 CANALETA METÁLICA 6X10 CMS ML ### 37,765 37,765 37,765 37,765 37,765 37,765 37,765
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,636 24,636 24,636 24,636 24,636 24,636 24,636
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,238 27,238 27,238 27,238 27,238 27,238 27,238
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,330 28,330 28,330 28,330 28,330 28,330 28,330
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 47,541 47,541 47,541 47,541 47,541 47,541 47,541
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
21.36 SWITCH 10/100/1000 24 PUERTOS UN ###
i 614,491 614,491 614,491 614,491 614,491 614,491 614,491
p
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### i 315,883 315,883 315,883 315,883 315,883 315,883 315,883
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### o 88,938 88,938 88,938 88,938 88,938 88,938 88,938
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,843 1,843 1,843 1,843 1,843 1,843 1,843
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,506 8,506 8,506 8,506 8,506 8,506 8,506
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,669 12,669 12,669 12,669 12,669 12,669 12,669
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,132 21,132 21,132 21,132 21,132 21,132 21,132
21.43 CABLE TELEVISIÓN RG6 ML ### 3,922 3,922 3,922 3,922 3,922 3,922 3,922
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,479 22,479 22,479 22,479 22,479 22,479 22,479
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,663 32,663 32,663 32,663 32,663 32,663 32,663
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,450 19,450 19,450 19,450 19,450 19,450 19,450
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN) ML ### 15,422 15,422 15,422 15,422 15,422 15,422 15,422
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 619,545 619,545 619,545 619,545 619,545 619,545 619,545
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 90,714 90,714 90,714 90,714 90,714 90,714 90,714
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 510,422 510,422 510,422 510,422 510,422 510,422 510,422
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,089,406 1,089,406 1,089,406 1,089,406 1,089,406 1,089,406 1,089,406
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 124,957 124,957 124,957 124,957 124,957 124,957 124,957
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 760,638 760,638 760,638 760,638 760,638 760,638 760,638
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,636,662 1,636,662 1,636,662 1,636,662 1,636,662 1,636,662 1,636,662
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,157 13,157 13,157 13,157 13,157 13,157 13,157
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,206 16,206 16,206 16,206 16,206 16,206 16,206
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,324 20,324 20,324 20,324 20,324 20,324 20,324
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,235 22,235 22,235 22,235 22,235 22,235 22,235
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,637 26,637 26,637 26,637 26,637 26,637 26,637
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,637 26,637 26,637 26,637 26,637 26,637 26,637
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 106,762 106,762 106,762 106,762 106,762 106,762 106,762
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 123,676 123,676 123,676 123,676 123,676 123,676 123,676
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 382,681 382,681 382,681 382,681 382,681 382,681 382,681
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 143,682 143,682 143,682 143,682 143,682 143,682 143,682
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 236,860 236,860 236,860 236,860 236,860 236,860 236,860
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,047,821 1,047,821 1,047,821 1,047,821 1,047,821 1,047,821 1,047,821
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,207,205 1,207,205 1,207,205 1,207,205 1,207,205 1,207,205 1,207,205
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,238 14,238 14,238 14,238 14,238 14,238 14,238
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,573 12,573 12,573 12,573 12,573 12,573 12,573
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 30,865 30,865 30,865 30,865 30,865 30,865 30,865
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 122,677 122,677 122,677 122,677 122,677 122,677 122,677
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 182,553 182,553 182,553 182,553 182,553 182,553 182,553
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 29,897 29,897 29,897 29,897 29,897 29,897 29,897
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 102,887 102,887 102,887 102,887 102,887 102,887 102,887
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 152,335 152,335 152,335 152,335 152,335 152,335 152,335
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,189 30,189 30,189 30,189 30,189 30,189 30,189
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 62,214 62,214 62,214 62,214 62,214 62,214 62,214
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 250,303 250,303 250,303 250,303 250,303 250,303 250,303
1.32 UNIÓN REPARACION PVC 4" UN ### 72,566 72,566 72,566 72,566 72,566 72,566 72,566
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 291,177 291,177 291,177 291,177 291,177 291,177 291,177
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 174,893 174,893 174,893 174,893 174,893 174,893 174,893
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 496,919 496,919 496,919 496,919 496,919 496,919 496,919
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
1.36 VÁLVULA COMPUERTA ELÁSTICA 6"
i
UN ### 1,329,921 1,329,921 1,329,921 1,329,921 1,329,921 1,329,921 1,329,921
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 1,965,059 1,965,059 1,965,059 1,965,059 1,965,059 1,965,059 1,965,059
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,797 10,797 10,797 10,797 10,797 10,797 10,797
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,689 24,689 24,689 24,689 24,689 24,689 24,689
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 99,110 123,723 99,959 92,320 110,143 105,051 108,446
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 72,148 67,008 60,155 60,155 56,728 56,728 56,728
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 84,443 79,302 69,045 72,449 69,022 69,022 69,022
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 77,071 73,996 80,384 107,358 67,847 67,847 67,847
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 93,053 89,919 85,740 85,740 75,293 83,651 73,203
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 113,036 138,608 113,919 105,982 124,499 119,210 122,737
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 114,123 114,123 114,123 114,123 114,123 114,123 114,123
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,189,204 1,189,204 1,189,204 1,189,204 1,189,204 1,189,204 1,189,204
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 149,117 149,117 149,117 149,117 149,117 149,117 149,117
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,377,386 1,377,386 1,377,386 1,377,386 1,377,386 1,377,386 1,377,386
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 960,078 960,078 960,078 960,078 960,078 960,078 960,078
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,584 62,584 62,584 62,584 62,584 62,584 62,584
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 113,289 113,289 113,289 113,289 113,289 113,289 113,289
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 267,436 267,436 267,436 267,436 267,436 267,436 267,436
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 267,429 267,429 267,429 267,429 267,429 267,429 267,429
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 429,318 429,318 429,318 429,318 429,318 429,318 429,318
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 113,337 113,337 113,337 113,337 113,337 113,337 113,337
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 113,337 113,337 113,337 113,337 113,337 113,337 113,337
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 267,436 267,436 267,436 267,436 267,436 267,436 267,436
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 267,436 267,436 267,436 267,436 267,436 267,436 267,436
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 429,318 429,318 429,318 429,318 429,318 429,318 429,318
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 431,791 431,791 431,791 431,791 431,791 431,791 431,791
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 700,607 700,607 700,607 700,607 700,607 700,607 700,607
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,124,257 1,124,257 1,124,257 1,124,257 1,124,257 1,124,257 1,124,257
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 69,484 69,484 69,484 69,484 69,484 69,484 69,484
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 361,455 361,455 361,455 361,455 361,455 361,455 361,455
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 404,582 404,582 404,582 404,582 404,582 404,582 404,582
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,120,140 1,120,140 1,120,140 1,120,140 1,120,140 1,120,140 1,120,140
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 65,745 66,008 65,754 65,672 65,863 65,808 65,845
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 327,750 327,750 327,750 327,750 327,750 327,750 327,750
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 49,824 49,824 49,824 49,824 49,824 49,824 49,824
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 70,438 70,438 70,438 70,438 70,438 70,438 70,438
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 101,616 101,616 101,616 101,616 101,616 101,616 101,616
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 155,969 155,969 155,969 155,969 155,969 155,969 155,969
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 250,606 250,606 250,606 250,606 250,606 250,606 250,606
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 364,028 364,028 364,028 364,028 364,028 364,028 364,028
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 460,545 460,545 460,545 460,545 460,545 460,545 460,545
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 605,497 605,497 605,497 605,497 605,497 605,497 605,497
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 832,606 832,606 832,606 832,606 832,606 832,606 832,606
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 73,981 75,357 74,028 73,601 74,598 74,313 74,503
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 87,397 88,773 87,444 87,017 88,014 87,729 87,919
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 56,535 59,779 56,647 55,640 57,989 57,318 57,765
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 61,241 64,432 61,351 60,361 62,672 62,012 62,452
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ###
i 61,350 64,434 61,456 60,499 62,733 62,094 62,520
p
5.6 BORDE SEPARADOR VERDE A-170 ML ### i 252,155 252,632 252,172 252,024 252,369 252,270 252,336
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### o 18,498 18,888 18,512 18,391 18,673 18,592 18,646
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,462 42,748 40,541 39,832 41,487 41,014 41,329
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 83,044 83,299 83,053 82,974 83,158 83,105 83,141
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 556,083 562,953 556,320 554,188 559,163 557,741 558,689
5.11 LOSETA PREFABRICADA A-40 M2 ### 62,516 63,606 62,554 62,215 63,005 62,779 62,930
5.12 LOSETA PREFABRICADA A-60 M2 ### 90,420 91,510 90,457 90,119 90,909 90,683 90,833
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 33,621 34,898 33,665 33,269 34,194 33,929 34,105
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 54,199 56,782 54,288 53,487 55,357 54,822 55,179
5.15 SARDINEL PREFABRICADO A-10 ML ### 101,234 100,892 99,850 99,771 99,558 99,505 99,540
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,090 60,750 60,113 59,908 60,386 60,249 60,340
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 202,119 203,638 202,171 201,700 202,800 202,486 202,695
6.2 BANCA EN CONCRETO M-30 UN ### 662,188 664,315 662,261 661,601 663,141 662,701 662,994
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 213,479 213,797 213,490 213,391 213,621 213,555 213,599
6.4 BOLARDO M-60 CONCRETO UN ### 161,569 163,392 161,632 161,066 162,386 162,009 162,261
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 163,437 165,260 163,500 162,934 164,254 163,877 164,128
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 191,415 193,323 191,481 190,889 192,270 191,875 192,139
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 59,360 60,415 59,397 59,070 59,833 59,615 59,760
6.8 BORDILLO PREFABRICADO A-80 ML ### 68,401 69,581 68,442 68,075 68,930 68,686 68,849
6.9 CANECA M-120 UN ### 309,591 309,854 309,600 309,518 309,709 309,654 309,691
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 816,371 817,283 816,403 816,120 816,780 816,591 816,717
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,346,428 3,347,036 3,346,449 3,346,261 3,346,701 3,346,575 3,346,659
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,442,488 3,443,096 3,442,509 3,442,321 3,442,761 3,442,635 3,442,719
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 481,594 482,230 481,616 481,419 481,880 481,748 481,836
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 638,506 641,050 638,593 637,804 639,646 639,120 639,471
6.15 BANCA EN MADERA M-50 UN ### 529,874 529,874 529,874 529,874 529,874 529,874 529,874
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 246,451 247,362 246,482 246,199 246,859 246,671 246,797
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 570,679 571,338 570,702 570,497 570,974 570,838 570,929
6.18 POSTE HISTÓRICO M-131 UN ### 6,362,281 6,366,839 6,362,438 6,361,024 6,364,324 6,363,381 6,364,010
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,999 3,999 3,999 3,999 3,999 3,999 3,999
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ###
i 43,048 43,048 43,048 43,048 43,048 43,048 43,048
p
7.3 SEÑAL DOBLE DE CICLORUTA UN ### i 310,909 311,148 310,918 310,844 311,016 310,967 311,000
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### o 490,367 491,640 490,411 490,017 490,938 490,675 490,850
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 233,205 233,443 233,213 233,139 233,311 233,262 233,295
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 247,617 247,855 247,625 247,551 247,723 247,674 247,707
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 258,531 258,769 258,539 258,465 258,637 258,588 258,621
7.8 TACHAS REFLECTIVAS UN ### 13,444 13,444 13,444 13,444 13,444 13,444 13,444
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,354 14,354 14,354 14,354 14,354 14,354 14,354
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 116,684 116,684 116,684 116,684 116,684 116,684 116,684
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO
1.1 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,228 35,228 35,228 35,228 35,228 35,228 35,228
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499 7,499 7,499
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 EXISTENTE M2 ### 481 481 481 481 481 481 481
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,271 14,271 14,271 14,271 14,271 14,271 14,271
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,189 19,189 19,189 19,189 19,189 19,189 19,189
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 148,168 143,225 133,363 136,635 133,340 133,340 133,340
SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000
4.52 640.1 PSI KG ### 4,382 4,382 4,382 4,382 4,382 4,382 4,382
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
CONSTRUCCIÓN
DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
i
CONSTRUCCIÓN p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,893,673
1.2 CAMPAMENTO 9 M2 UN ### 1,109,777
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 13,730
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,387
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 17,817
1.6 CERCA EN TABLA H=2.30 M ML ### 62,384
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 43,695
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 20,283
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 851,364
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 9,935
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,569
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,540,612
1.44 RED TELEFÓNICA PROVISIONAL UN ### 236,619
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 68,916
2.2 BASE ARENA CEMENTO 1:20 M3 ### 172,850
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 21,050
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 592,656
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 594,311
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 554,442
2.9 PILOTE DE MADERA D=20 CM ML ### 49,143
2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 151,470
2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 187,207
2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 230,425
2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 288,603
2.14 PILOTE HINCADO 25X25 ML ### 100,382
2.15 PILOTE HINCADO 30X30 ML ### 122,903
2.16 DADOS EN CONCRETO 3500PSI M3 ### 540,293
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 90,528
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 40,233
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 52,919
4.3 COLUMNAS 3500 PSI M3 ### 754,859
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 209,289
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.5 PSI M2 ### 91,486
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.6 PSI M2 ### 107,670
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 121,365
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 127,997
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 146,058
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 162,200
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 179,925
4.12 ENTREPISO VIGUETA PLACA M2 ### 94,722
4.13 ESCALERA MACIZA 3500 PSI M3 ### 895,422
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 90,228
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 74,102
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 82,995
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 96,344
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 658,171
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 47,497
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 260,961
4.21 ACERO FIGURADO 37000 PSI KG ### 3,972
4.22 ACERO FIGURADO 60000 PSI KG ### 4,166
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
4.23 REFUERZO MALLA ELECTROSOLDADA KG ###
i 5,937
p
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### i 803,669
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### o 726,017
4.26 VIGA AÉREA 3500 PSI M3 ### 796,882
4.27 VIGA CINTA 3500 PSI M3 ### 776,775
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 986,688
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 280,773
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 28,525
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 48,832
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 34,110
5.4 ARCOS EN LADRILLO PRENSADO ML ### 159,822
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 42,328
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,105
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 94,228
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 84,884
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 88,098
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 51,973
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 84,922
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 50,384
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 97,938
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 58,214
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 108,718
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 63,604
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 39,110
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 23,869
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 50,706
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 30,732
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 57,082
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 34,594
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 94,532
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 56,345
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 35,947
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 21,955
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 71,221
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 43,272
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ###
i 83,818
p
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### i 51,248
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### o 172,924
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 104,856
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 85,746
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 52,212
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 44,890
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 27,544
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 32,603
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,007
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 48,809
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 30,185
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 94,050
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 57,773
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 68,766
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 41,832
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 143,923
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 88,307
5.47 REMATES LADRILLO PRENSADO ML ### 30,650
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 34,985
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 59,185
5.50 LAVADA DE FACHADA M2 ### 5,213
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,186
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,538
5.53 ANCLAJE 3/8" L=30CM UN ### 13,769
5.54 ANCLAJE 1/2" L=50CM UN ### 17,948
5.55 ANCLAJE 5/8" L=70CM UN ### 24,868
5.56 ANCLAJE 3/4" L=70CM UN ### 36,736
5.57 ANCLAJE 1" L= 70CM UN ### 4,606
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 25,870
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### 78,290
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 52,685
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 21,315
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 33,355
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 76,712
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 60,269
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 35,439
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 80,353
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 95,769
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 140,309
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 56,115
7.13 CANAL PVC AMAZONAS ML ### 78,353
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
7.14 CANAL PVC RAINGO ML ###
i 71,397
p
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### i 125,097
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### o 72,841
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 53,705
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 31,354
7.19 TEJA DE BARRO M2 ### 57,048
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 44,744
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 41,069
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 35,206
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 34,423
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 34,675
7.25 TEJA TERMOACÚSTICA M2 ### 48,337
7.26 TEJA PLÁSTICA No.6 M2 ### 42,610
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 77,339
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 141,997
7.29 TEJA SIN TRASLAPO M2 ### 64,139
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 41,553
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 32,342
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 55,481
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 19,601
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 23,391
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 25,202
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 32,198
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 21,489
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 50,468
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 334,686
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 399,530
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 257,692
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 274,376
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 404,572
8.2 CONCRETO 3500 PSI M3 ### 352,689
8.3 CONCRETO 3000 PSI M3 ### 350,859
8.4 CONCRETO 2500 PSI M3 ### 308,518
8.5 CONCRETO 2000 PSI M3 ### 286,006
8.6 CONCRETO 1500 PSI M3 ### 257,484
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
8.7 MORTERO SECO 1:10 M3 ###
i 215,815
p
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### i 417,660
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### o 390,914
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 448,456
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 660,276
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 117,838
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,747
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 132,558
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 161,555
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 231,868
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 257,891
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 283,947
9.8 HOJA PUERTA FORTEC 0.81 UN ### 188,136
9.9 HOJA PUERTA FORTEC 0.91 UN ### 213,151
9.10 HOJA PUERTA FORTEC 1.50 UN ### 313,210
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 119,345
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 158,118
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 175,628
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 445,788
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 40,503
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 25,635
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 95,818
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 114,306
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 88,916
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 27,930
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 27,930
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 26,504
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 40,680
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 50,154
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 60,260
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 72,261
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 337,602
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 236,542
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 32,469
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 41,311
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
9.31 VIDRIO TRANSPARENTE 5 MM M2 ###
i 50,154
p
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### i 62,787
o
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 72,986
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 200,017
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 77,736
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 140,732
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 131,341
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 86,264
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 202,438
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 105,953
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,387
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 97,382
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 115,594
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 40,046
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 508,777
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 183,982
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 208,322
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 465,040
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 125,060
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 370,485
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 5,822
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 261,779
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 118,682
10.21 REJILLA PISO 0.30 M M2 ### 82,590
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 85,533
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,319
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,
10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,403
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,151
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 346,043
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 54,968
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 64,923
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 72,263
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 84,919
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 51,768
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 58,937
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
12.8 STRIP TELEFÓNICO 10 PARES UN ###
i 136,990
p
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### i 53,092
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### o 121,800
12.11 SALIDA T.V PVC COMPLETA. UN ### 72,998
12.12 SALIDA BIFÁSICA C.N. UN ### 43,269
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 91,625
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 391,652
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 520,763
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,369
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,454
12.18 TUBERÍA PVC CONDUIT 1" ML ### 6,914
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,379
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 259,641
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 73,672
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 99,210
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 41,363
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,338,603
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 992,522
12.26 POSTE METÁLICO 6M UN ### 1,225,519
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 567,518
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 104,746
12.29 LUMINARIA 70W SODIO UN ### 475,814
12.30 LUMINARIA 150W SODIO UN ### 594,792
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,567,877
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,155,133
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 38,281
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 37,601
13.3 ALISTADO PARA LISTÓN M2 ### 14,434
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 26,636
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 80,534
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 25,883
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 53,463
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 73,123
13.9 MANTO FIBERGLASS 600X1 M2 ### 29,184
13.10 PEGANTE MORTERO-CONCRETO M2 ### 22,454
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
13.11 PERMA PLY 2 CAPAS M2 ###
i 26,478
p
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### i 43,167
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### o 50,379
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 72,491
13.15 TRITURADO FINO 1/2 M3 ### 76,980
13.16 TRITURADO GRUESO 3/4 M3 ### 82,890
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 55,241
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 33,290
14.3 ADOQUÍN CONCRETO 6CM M2 ### 63,088
14.4 ADOQUÍN CONCRETO 8CM M2 ### 66,188
14.5 ADOQUÍN GRES PEATONAL M2 ### 70,316
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 72,311
14.7 GRAVILLA PARA GRADAS ML ### 37,066
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 156,803
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 45,599
14.10 GUARDAESCOBA EN GRANITO ML ### 43,323
14.11 GUARDAESCOBA EN GRAVILLA ML ### 9,854
14.12 GUARDAESCOBA PVC CARAMELO ML ### 8,946
14.13 GUARDAESCOBA PVC CEDRO ML ### 11,977
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,267
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 16,965
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 32,725
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,232
14.18 LISTÓN M.H. AMARILLO M2 ### 72,202
14.19 PASO ESCALERA GRANITO ML ### 115,293
14.20 PIRLANES ALUMINIO ML ### 7,613
14.21 PIRLANES LADRILLO ML ### 31,428
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 44,055
14.23 PISO VINILO TRÁFICO PESADO M2 ### 51,036
14.24 PULIDA LACADA PISO MADERA M2 ### 48,026
14.25 TABLETA DE GRES 25X25 M2 ### 48,015
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 53,736
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 10,860
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 47,838
14.29 JABONERA PORCELANA ACUARIO UN ### 19,844
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ###
i 118,115
p
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### i 9,888
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### o 21,748
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,141
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 13,753
14.35 REMATES BOCEL ALUMINIO ML ### 8,544
14.36 REMATES BOCEL PORCELANA ML ### 8,686
14.37 TAPA REGISTRO 20X20 UN ### 18,505
14.38 TAPA REGISTRO 6X6 UN ### 16,911
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 17,635
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 20,387
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 62,642
14.42 MEDIA CAÑA EN GRANITO ML ### 73,687
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,413
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 12,917
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 96,239
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 116,974
15 CIELO RASO
15.1 APLIQUE YESO ML ### 69,307
15.2 ARMADURA MADERA Y MALLA M2 ### 35,740
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 53,961
15.4 CIELO RASO DURACUSTIC M2 ### 65,831
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 49,288
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 90,664
15.7 CORNISAS YESO ML ### 46,419
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,850
15.9 MALLA CON VENA M2 ### 13,354
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16.2 MENOR DE 5 KM) M3 ### 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ###
i 85,005
p
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### i 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### o 55,331
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 65,606
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 141,665
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 58,822
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 121,996
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 138,635
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 288,111
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 843,407
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 458,264
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 135,489
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 187,926
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 174,756
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 380,843
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 969,408
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 277,532
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 197,901
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 80,540
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA) UN ### 238,509
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17.13 ACCESORIOS Y GRIFERÍA) UN ### 349,825
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,181
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,008
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,023
18.4 BARNIZ SOBRE MUEBLES M2 ### 41,145
18.5 CARBURO SOBRE PAÑETES M2 ### 5,770
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 62,328
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,451
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,709
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 13,693
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 3,949
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
18.11 ESMALTE SOBRE MADERA LLENA M2 ###
i 14,430
p
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### i 5,536
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### o 6,324
18.14 ESTUCO M2 ### 6,974
18.15 ESTUCO (LINEAL) ML ### 4,382
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,274
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,516
18.18 LACA PISOS MADERA M2 ### 22,597
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,652
18.20 MARMOLINA SOBRE PAÑETE M2 ### 11,765
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,182
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,353
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 6,965
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,403
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,136
18.26 PINTURA EPÓXICA M2 ### 12,527
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,773
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 5,724,476
19.2 CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,114,338
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,647,293
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 8,650,680
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,099,265
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,652
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 814,333
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 81,103
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,470,447
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 639,735
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 107,789
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,121,094
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 140,771
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,298,449
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 905,229
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 61,849
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 107,003
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 252,358
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 252,353
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 405,004
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 107,048
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 107,048
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 252,358
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 252,358
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 405,004
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 409,289
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 662,639
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,062,805
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 65,730
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 343,000
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 382,082
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,058,725
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 61,936
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 311,234
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 47,184
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 66,615
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 96,003
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 147,306
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 236,497
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 344,598
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 435,640
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 572,634
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 786,675
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 69,245
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 81,881
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 51,174
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 55,619
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 55,811
5.6 BORDE SEPARADOR VERDE A-170 ML ### 238,155
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 17,789
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 36,732
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ###
i 79,250
p
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### i 530,463
5.11 LOSETA PREFABRICADA A-40 M2 ### o 59,457
5.12 LOSETA PREFABRICADA A-60 M2 ### 85,448
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 31,239
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 49,594
5.15 SARDINEL PREFABRICADO A-10 ML ### 93,871
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 57,278
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 190,855
6.2 BANCA EN CONCRETO M-30 UN ### 624,914
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 203,044
6.4 BOLARDO M-60 CONCRETO UN ### 152,711
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 154,579
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 180,739
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 56,209
6.8 BORDILLO PREFABRICADO A-80 ML ### 63,664
6.9 CANECA M-120 UN ### 292,663
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 772,308
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,158,015
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,248,549
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 454,476
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 600,889
6.15 BANCA EN MADERA M-50 UN ### 501,269
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 234,271
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 538,325
6.18 POSTE HISTÓRICO M-131 UN ### 6,000,247
7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,776
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 41,134
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 294,490
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 464,473
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 223,017
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 236,601
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 246,887
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
7.8 TACHAS REFLECTIVAS UN ###
i 12,794
p
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### i 13,650
o
7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 110,404
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIASp 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM) M3 ### 152,777
1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673
1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.4 200.2 DISTANCIA DE 5KM)
HA ### 933,801
1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y
1.6 *** DERRUMBES M3-KM### 1,318
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2.11 600.3 5 KM) M3 ### 78,781
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 600.4 MENOR DE 5 KM)
M3 ### 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 600.4 P DISTANCIA MENOR DE 5 KM) M3 ### 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.14 600.5 DISTANCIA MENOR DE 5 KM) M3 ### 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.15 600.5 P DISTANCIA MENOR DE 5 KM) M3 ### 53,644
4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,706
4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,124
4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,706
4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 16,605
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE
4.48 661.1 EMBOQUILLADA ML ### 591,769
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 332,848
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 826,513
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 128,308
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,166
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 80,330
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 122,313
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 474,462
4.56 682.1 P COLCHONETA RENO M3 ### 179,724
4.57 *** TRINCHO EN MADERA M2 ### 63,673
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN
DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
CONSTRUCCIÓN
1,888,293
1,107,087
13,730
15,387
17,817
62,384
43,636
20,225
80,242
6,261
8,882
6,813
7,419
8,964
9,084
13,497
18,477
27,441
39,898
49,367
40,806
57,319
67,872
83,193
9,103
14,736
22,422
36,746
233,157
1,539
5,807
20,960
11,490
11,307
10,480
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
9,803
15,459
13,512
11,490
851,250
9,935
3,569
2,540,612
236,619
9,189
68,916
167,486
297,878
207,425
21,050
586,907
588,346
548,857
49,143
151,470
187,207
230,425
288,603
99,975
122,313
534,707
90,528
36,661
186,984
412,581
212,009
239,261
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
311,111
102,700
1,209,032
109,449
68,688
26,479
42,512
55,634
75,996
105,054
899,984
1,267,152
1,642,536
40,233
52,919
749,273
206,448
90,944
107,019
120,497
127,075
144,919
160,898
178,461
94,626
889,836
90,148
73,544
82,311
95,487
652,586
47,324
258,467
3,972
4,166
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
5,937
798,083
719,904
791,297
771,189
981,102
274,615
28,377
48,684
34,076
159,755
42,156
26,025
94,095
84,310
88,098
51,973
84,922
50,384
97,938
58,214
108,718
63,604
39,043
23,835
50,661
30,710
57,038
34,572
94,309
56,234
35,903
21,932
71,132
43,227
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
83,738
51,208
172,612
104,700
85,580
52,128
44,790
27,494
32,558
19,985
48,720
30,141
93,916
57,706
68,676
41,788
143,610
88,151
30,617
34,865
59,025
5,213
49,037
10,538
13,769
17,948
24,868
36,736
4,565
15,958
5,542
6,728
7,949
6,571
13,444
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
23,657
14,422
20,350
12,459
19,766
12,167
20,350
12,459
20,857
12,711
16,987
10,489
16,542
10,266
21,128
12,828
20,544
12,536
17,152
10,554
21,433
13,385
25,737
78,003
52,685
21,315
33,355
76,712
60,269
35,439
80,353
95,769
140,309
56,115
78,353
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
71,397
125,097
72,841
53,705
31,354
56,882
44,744
41,069
35,206
34,423
34,675
48,337
42,610
77,339
141,997
64,139
41,553
32,342
55,481
19,601
23,391
25,202
32,198
21,489
50,468
334,686
399,530
257,692
274,376
398,669
347,266
345,278
302,774
280,145
251,506
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
211,216
413,196
385,357
443,259
655,079
117,838
3,714
132,558
161,555
231,868
257,891
283,947
188,136
213,151
313,210
119,345
158,118
175,628
445,788
40,503
25,635
95,818
114,306
88,916
27,930
27,930
26,504
40,680
50,154
60,260
72,261
337,602
236,542
32,469
41,311
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
50,154
62,787
72,986
200,017
77,736
140,732
131,341
86,264
202,438
105,953
6,387
97,382
115,594
40,046
508,777
183,982
208,322
465,040
125,060
370,485
5,822
261,779
118,682
82,590
85,533
10,319
11,403
9,151
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
215,105
257,791
21,315
33,355
32,190
41,088
84,207
216,380
44,216
616,334
1,268,924
34,174
65,656
97,904
81,975
60,661
64,324
81,238
64,921
80,545
85,960
70,482
12,019
16,788
21,946
13,639
8,203
48,555
31,170
10,235
24,202
33,474
45,357
84,074
102,745
57,388
72,797
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
175,038
359,662
266,252
16,947
21,360
165,995
269,023
446,810
38,636
45,507
58,893
66,291
85,336
99,779
147,941
59,929
60,165
38,435
47,140
3,967
6,222
965,256
740,373
2,457,010
2,050,189
602,683
776,786
295,891
346,043
54,968
64,923
72,263
84,919
51,768
58,937
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
136,990
53,092
121,800
72,998
43,269
91,625
391,652
520,763
3,369
4,454
6,914
12,379
259,641
73,672
99,210
41,363
1,338,603
992,522
1,225,519
567,518
104,746
475,814
594,792
1,567,877
1,155,133
38,081
37,401
14,394
26,236
80,135
25,766
52,889
72,203
29,184
22,454
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
26,478
42,650
49,747
71,515
72,882
80,839
55,161
33,250
62,888
65,988
70,116
72,231
36,997
156,444
45,421
43,323
9,785
8,946
11,977
10,267
16,965
32,725
9,232
72,202
115,013
7,613
31,362
44,055
51,036
48,026
47,935
53,656
10,860
47,739
19,844
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
118,115
9,888
21,748
14,141
13,753
8,544
8,686
18,505
16,911
17,635
20,387
62,562
73,687
34,413
12,917
96,239
116,974
69,307
35,740
53,961
65,831
49,288
90,664
46,419
99,850
13,354
5,627
18,479
25,905
43,707
49,987
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
85,005
19,114
61,471
62,438
149,094
58,822
136,211
146,063
288,111
843,407
458,264
135,489
187,926
174,756
380,843
969,408
277,532
197,901
80,540
238,509
349,825
8,181
3,008
11,023
41,145
5,770
62,328
3,451
2,709
13,693
3,949
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
14,430
5,536
6,324
6,974
4,382
15,274
9,516
22,597
2,652
11,765
3,182
12,353
6,965
4,403
21,136
12,527
7,773
5,724,476
10,114,338
2,647,293
8,650,680
8,099,265
2,652
814,333
81,103
1,470,388
638,339
28,419
41,945
51,908
17,132
20,684
28,111
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
25,594
26,964
33,620
16,856
22,045
33,801
258,085
296,873
309,845
288,180
210,301
32,078
98,682
254,565
50,141
545,878
1,344,832
44,790
209,836
42,736
3,602
5,988
18,392
24,027
31,103
116,730
30,478
99,213
178,786
277,594
346,349
377,617
557,743
329,929
98,990
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
13,110
26,743
4,827
34,234
35,724
36,469
23,805
26,257
27,287
45,392
584,026
301,376
86,266
1,779
8,192
12,123
20,161
3,769
22,164
32,007
18,918
14,828
585,996
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
URBANISMO
9,712
85,882
481,831
1,028,280
118,155
717,650
1,543,272
12,710
15,583
19,464
21,265
25,414
25,414
100,852
116,871
361,439
135,648
223,620
988,311
1,138,525
13,652
12,082
29,120
116,394
172,825
28,487
97,743
144,346
28,684
59,023
236,678
68,778
275,200
166,227
469,708
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
1,253,839
1,852,497
10,578
24,249
19,114
59,927
56,437
63,882
56,377
51,648
71,948
107,789
1,121,094
140,771
1,298,449
905,229
61,849
107,003
252,358
252,353
405,004
107,048
107,048
252,358
252,358
405,004
409,289
662,639
1,062,805
65,730
343,000
382,082
1,058,725
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
61,892
311,234
47,184
66,615
96,003
147,306
236,497
344,598
435,640
572,634
786,675
623,478
614,560
668,100
737,760
868,733
767,801
962,145
1,378,112
1,848,459
2,446,778
1,732,826
3,652,923
134,277
69,012
81,648
50,570
55,033
55,242
238,051
17,716
36,307
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
79,194
529,075
59,219
85,210
31,004
49,120
95,088
57,134
190,576
624,523
202,986
152,376
154,244
180,388
56,030
63,464
292,619
772,140
3,157,903
3,248,437
454,359
600,420
501,269
234,104
538,214
5,999,410
3,776
41,134
294,438
464,239
222,965
236,549
246,835
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
12,794
13,650
110,404
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
SPECIFICACIONES TÉCNICAS INVIAS 2007)
152,777
53,673
2,613,971
933,801
89,524
1,318
9,548
34,556
8,749
14,967
13,068
7,499
481
12,832
20,948
64,007
78,781
19,035
39,738
31,203
53,644
5,366
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
136,211
146,063
139,125
3,034
1,335
209,182
61,638
523,482
553,232
595,581
582,982
360,883
283,295
272,697
36,380
159,998
58,822
12,737
5,120
579,089
607,767
626,864
6,847
79,348
848,890
724,972
769,204
514,024
607,992
512,016
605,904
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
671,047
529,644
713,144
11,558
14,706
1,730
2,569,362
3,966,313
1,653,790
82,279
343,239
405,909
16,041
420,882
65,426
62,727
328,665
327,079
335,722
340,657
349,300
463,800
555,988
164,097
167,974
38,899
14,571
9,585
13,588
18,224
21,809
27,972
6,879
7,821
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
8,123
5,825
8,706
7,124
8,706
16,605
591,688
331,572
826,513
128,308
4,166
80,330
122,313
468,431
179,724
63,673
3,776
41,134
78,379
65,271
138,085
12,794
823
131,984
25,566
8,310
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
448,890
1,804
14,638
23,534
9,143
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p CONSTRUCCIÓN
i
1 PRELIMINARES o
1.1 CAMPAMENTO 18 M2 UN ### 2,036,014 2,091,780 2,025,252 2,050,689 2,060,473 2,031,122 2,045,798
1.2 CAMPAMENTO 9 M2 UN ### 1,185,735 1,213,618 1,180,354 1,193,072 1,197,964 1,183,289 1,190,626
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,264 14,264 14,264 14,264 14,264 14,264 14,264
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,991 15,991 15,991 15,991 15,991 15,991 15,991
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,488 18,488 18,488 18,488 18,488 18,488 18,488
1.6 CERCA EN TABLA H=2.30 M ML ### 66,638 66,638 66,638 66,638 66,638 66,638 66,638
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,911 47,521 46,794 47,072 47,179 46,858 47,018
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,773 22,383 21,655 21,934 22,041 21,720 21,880
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### p 10,480 10,480 10,480 10,480 10,480 10,480 10,480
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
1.37 DESMONTE MUROS SECOS M2 ###
o 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 917,488 926,571 916,809 921,580 921,555 918,346 920,946
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,554 10,554 10,554 10,554 10,554 10,554 10,554
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,811 3,811 3,811 3,811 3,811 3,811 3,811
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,729,348 2,729,348 2,729,348 2,729,348 2,729,348 2,729,348 2,729,348
1.44 RED TELEFÓNICA PROVISIONAL UN ### 252,189 252,189 252,189 252,189 252,189 252,189 252,189
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 74,893 126,295 83,460 117,728 98,881 98,881 116,015
2.2 BASE ARENA CEMENTO 1:20 M3 ### 231,585 295,492 219,252 248,403 259,615 225,979 242,797
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,480 22,480 22,480 22,480 22,480 22,480 22,480
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 657,259 717,002 645,730 672,981 683,462 652,020 667,741
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 659,832 721,926 647,850 676,172 687,067 654,386 670,726
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 614,374 672,516 603,154 629,674 639,876 609,274 624,575
2.9 PILOTE DE MADERA D=20 CM ML ### 49,857 49,857 49,857 49,857 49,857 49,857 49,857
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM)
ML ### 153,787 153,787 153,787 153,787 153,787 153,787 153,787
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2.11 UNA DISTANCIA MENOR DE 5 KM) ML ### 192,371 192,371 192,371 192,371 192,371 192,371 192,371
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2.12 UNA DISTANCIA MENOR DE 5 KM) ML ### 239,031 239,031 239,031 239,031 239,031 239,031 239,031
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2.13 UNA DISTANCIA MENOR DE 5 KM)
ML ### 301,842 301,842 301,842 301,842 301,842 301,842 301,842
2.14 PILOTE HINCADO 25X25 ML ### 106,435 110,685 105,615 107,554 108,299 106,063 107,181
2.15 PILOTE HINCADO 30X30 ML ### 131,675 137,834 130,487 133,296 134,377 131,135 132,756
2.16 DADOS EN CONCRETO 3500PSI M3 ### 600,225 658,367 589,005 615,525 625,726 595,125 610,426
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 92,053 92,053 92,053 92,053 92,053 92,053 92,053
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS p
3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### i 39,040 39,437 38,964 39,145 39,214 39,005 39,110
3.2 SIFÓN EN PVC 6" UN ###
o 201,615 202,012 201,539 201,720 201,789 201,581 201,685
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 454,011 498,947 454,250 479,963 474,415 463,805 477,368
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 227,608 236,372 226,669 231,106 231,511 227,998 230,451
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 258,832 272,866 257,304 264,397 265,079 259,421 263,345
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 340,543 362,059 337,572 348,077 350,072 340,476 346,369
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 105,166 105,465 105,216 105,415 105,305 105,305 105,405
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,304,747 1,307,732 1,305,244 1,307,234 1,306,140 1,306,140 1,307,135
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 119,033 123,419 118,187 120,187 120,957 118,648 119,803
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 75,021 77,335 74,574 75,630 76,036 74,818 75,427
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,400 29,417 28,203 28,668 28,846 28,311 28,578
3.12 TUBERÍA DRENAJE PVC 160 ML ### 45,707 46,725 45,511 45,975 46,154 45,618 45,886
3.13 TUBERÍA DRENAJE PVC 200 ML ### 60,021 61,445 59,746 60,396 60,646 59,896 60,271
3.14 TUBERÍA DRENAJE PVC 250 ML ### 82,140 83,768 81,826 82,569 82,854 81,998 82,426
3.15 TUBERÍA DRENAJE PVC 315 ML ### 113,576 115,001 113,301 113,951 114,201 113,451 113,826
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 975,979 992,258 972,838 980,263 983,119 974,551 978,835
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,861 42,861 42,861 42,861 42,861 42,861 42,861
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 56,624 56,624 56,624 56,624 56,624 56,624 56,624
4.3 COLUMNAS 3500 PSI M3 ### 822,355 880,497 811,135 837,656 847,857 817,255 832,556
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 253,358 296,837 245,583 263,238 276,651 249,368 268,442
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4.5 DE REFUERZO, CONCRETO DE 3500 PSI
M2 ### 100,635 106,279 99,545 102,120 103,110 100,139 101,625
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
4.6 DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 118,734 125,508 117,427 120,517 121,705 118,140 119,923
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 132,208 141,240 130,465 134,585 136,170 131,416 133,793
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 139,507 149,104 137,655 142,033 143,716 138,666 141,191
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### i 160,000 171,854 157,712 163,119 165,199 158,960 162,079
o
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 178,026 191,573 175,411 181,591 183,968 176,837 180,403
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 197,604 212,845 194,663 201,615 204,289 196,267 200,278
4.12 ENTREPISO VIGUETA PLACA M2 ### 100,866 101,715 100,702 101,089 101,238 100,791 101,015
4.13 ESCALERA MACIZA 3500 PSI M3 ### 972,629 1,030,771 961,409 987,929 998,130 967,529 982,830
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 97,060 97,910 96,895 97,283 97,433 96,985 97,209
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 80,990 86,804 79,868 82,520 83,540 80,480 82,010
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 91,191 98,304 89,819 93,063 94,311 90,568 92,439
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 106,362 115,281 104,641 108,710 110,274 105,580 107,927
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 720,499 778,641 709,279 735,799 746,000 715,399 730,700
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4.19 M) UN ### 50,036 51,834 49,689 50,509 50,825 49,879 50,352
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 287,706 313,673 282,695 294,540 299,095 285,429 292,262
4.21 ACERO FIGURADO 37000 PSI KG ### 4,260 4,260 4,260 4,260 4,260 4,260 4,260
4.22 ACERO FIGURADO 60000 PSI KG ### 4,468 4,468 4,468 4,468 4,468 4,468 4,468
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,243 6,243 6,243 6,243 6,243 6,243 6,243
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 867,990 926,132 856,770 883,291 893,492 862,890 878,191
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 792,794 856,425 780,515 809,539 820,703 787,213 803,958
4.26 VIGA AÉREA 3500 PSI M3 ### 862,169 920,312 850,950 877,470 887,671 857,070 872,370
4.27 VIGA CINTA 3500 PSI M3 ### 842,098 900,240 830,878 857,398 867,599 836,998 852,299
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,052,776 1,110,919 1,041,557 1,068,077 1,078,278 1,047,677 1,062,977
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 333,764 397,586 321,448 350,559 361,756 328,166 344,961
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,288 31,883 29,980 30,708 30,988 30,148 30,568
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 50,693 52,288 50,385 51,113 51,393 50,553 50,973
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,590 35,987 35,513 35,694 35,764 35,555 35,660
5.4 ARCOS EN LADRILLO PRENSADO ML ### 166,047 166,841 165,894 166,256 166,395 165,977 166,186
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,814 46,611 44,467 45,287 45,602 44,656 45,129
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,678 28,529 27,514 27,902 28,051 27,604 27,828
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 101,556 103,144 101,250 101,974 102,253 101,417 101,835
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### p 93,021 99,013 91,864 94,598 95,649 92,495 94,072
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### i 92,707 92,707 92,707 92,707 92,707 92,707 92,707
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ###
o 54,277 54,277 54,277 54,277 54,277 54,277 54,277
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 89,260 89,260 89,260 89,260 89,260 89,260 89,260
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,553 52,553 52,553 52,553 52,553 52,553 52,553
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 103,651 103,651 103,651 103,651 103,651 103,651 103,651
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 61,071 61,071 61,071 61,071 61,071 61,071 61,071
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 115,347 115,347 115,347 115,347 115,347 115,347 115,347
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,919 66,919 66,919 66,919 66,919 66,919 66,919
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 41,708 42,506 41,554 41,918 42,058 41,638 41,848
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,168 25,567 25,091 25,273 25,343 25,133 25,238
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 54,189 54,721 54,086 54,329 54,422 54,142 54,282
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,474 32,740 32,422 32,544 32,590 32,450 32,520
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 60,911 61,443 60,808 61,051 61,144 60,864 61,004
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,508 36,774 36,457 36,578 36,625 36,485 36,555
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 102,091 104,750 101,578 102,791 103,257 101,858 102,557
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 60,124 61,454 59,868 60,474 60,708 60,008 60,358
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 38,109 38,641 38,006 38,249 38,342 38,062 38,202
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,035 23,301 22,984 23,105 23,152 23,012 23,082
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 75,920 76,983 75,714 76,199 76,386 75,826 76,106
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,621 46,153 45,518 45,761 45,854 45,574 45,714
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 89,841 90,691 89,677 90,065 90,214 89,766 89,990
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 54,259 54,684 54,177 54,371 54,445 54,222 54,334
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 187,122 190,846 186,404 188,102 188,755 186,796 187,776
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 111,955 113,817 111,596 112,445 112,772 111,792 112,282
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 90,968 92,091 90,751 91,264 91,461 90,870 91,165
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,823 55,384 54,714 54,970 55,069 54,773 54,921
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 48,242 49,433 48,013 48,556 48,765 48,138 48,451
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,220 29,815 29,105 29,376 29,481 29,168 29,324
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 34,545 35,077 34,442 34,685 34,778 34,498 34,638
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,978 21,244 20,927 21,048 21,095 20,955 21,025
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 52,433 53,496 52,227 52,713 52,899 52,339 52,619
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,997 32,529 31,895 32,137 32,231 31,951 32,091
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 100,976 102,572 100,669 101,396 101,676 100,836 101,256
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 61,236 62,034 61,082 61,446 61,586 61,166 61,376
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 73,649 74,713 73,444 73,929 74,116 73,556 73,836
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### p 44,321 44,853 44,218 44,461 44,554 44,274 44,414
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### i 155,669 159,392 154,950 156,649 157,302 155,342 156,322
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ###
o 94,247 96,108 93,887 94,737 95,063 94,083 94,573
5.47 REMATES LADRILLO PRENSADO ML ### 32,410 32,807 32,333 32,515 32,584 32,375 32,480
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,641 37,450 36,486 36,854 36,996 36,571 36,783
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,988 63,066 61,780 62,272 62,461 61,894 62,177
5.50 LAVADA DE FACHADA M2 ### 5,260 5,260 5,260 5,260 5,260 5,260 5,260
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,058 52,653 50,750 51,477 51,757 50,918 51,337
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,631 10,631 10,631 10,631 10,631 10,631 10,631
5.53 ANCLAJE 3/8" L=30CM UN ### 14,056 14,056 14,056 14,056 14,056 14,056 14,056
5.54 ANCLAJE 1/2" L=50CM UN ### 18,371 18,371 18,371 18,371 18,371 18,371 18,371
5.55 ANCLAJE 5/8" L=70CM UN ### 25,732 25,732 25,732 25,732 25,732 25,732 25,732
5.56 ANCLAJE 3/4" L=70CM UN ### 38,390 38,390 38,390 38,390 38,390 38,390 38,390
5.57 ANCLAJE 1" L= 70CM UN ### 5,030 5,463 4,946 5,144 5,220 4,992 5,106
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 27,841 29,437 27,533 28,261 28,541 27,701 28,121
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE)
M2 ### 84,806 87,802 84,228 85,595 86,120 84,543 85,332
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 56,282 56,282 56,282 56,282 56,282 56,282 56,282
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,429 22,429 22,429 22,429 22,429 22,429 22,429
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,220 35,220 35,220 35,220 35,220 35,220 35,220
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 82,240 82,240 82,240 82,240 82,240 82,240 82,240
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 64,402 64,402 64,402 64,402 64,402 64,402 64,402
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,460 37,460 37,460 37,460 37,460 37,460 37,460
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 86,191 86,191 86,191 86,191 86,191 86,191 86,191
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 102,919 102,919 102,919 102,919 102,919 102,919 102,919
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 151,248 151,248 151,248 151,248 151,248 151,248 151,248
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 59,755 59,755 59,755 59,755 59,755 59,755 59,755
7.13 CANAL PVC AMAZONAS ML ### 83,027 83,027 83,027 83,027 83,027 83,027 83,027
7.14 CANAL PVC RAINGO ML ### 75,484 75,484 75,484 75,484 75,484 75,484 75,484
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 133,968 133,968 133,968 133,968 133,968 133,968 133,968
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 78,240 78,240 78,240 78,240 78,240 78,240 78,240
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 57,477 57,477 57,477 57,477 57,477 57,477 57,477
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,749 32,749 32,749 32,749 32,749 32,749 32,749
7.19 TEJA DE BARRO M2 ### 61,052 63,037 60,669 61,574 61,922 60,878 61,400
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 47,915 47,915 47,915 47,915 47,915 47,915 47,915
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,927 43,927 43,927 43,927 43,927 43,927 43,927
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 37,065 37,065 37,065 37,065 37,065 37,065 37,065
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 36,292 36,292 36,292 36,292 36,292 36,292 36,292
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 36,565 36,565 36,565 36,565 36,565 36,565 36,565
7.25 TEJA TERMOACÚSTICA M2 ### 51,455 51,455 51,455 51,455 51,455 51,455 51,455
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
7.26 TEJA PLÁSTICA No.6 M2 ### p 45,241 45,241 45,241 45,241 45,241 45,241 45,241
7.27 TEJA ESPAÑOLA ETERNIT M2 ### i 82,781 82,781 82,781 82,781 82,781 82,781 82,781
o
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 152,835 152,835 152,835 152,835 152,835 152,835 152,835
7.29 TEJA SIN TRASLAPO M2 ### 68,714 68,714 68,714 68,714 68,714 68,714 68,714
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 43,101 43,101 43,101 43,101 43,101 43,101 43,101
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,768 33,768 33,768 33,768 33,768 33,768 33,768
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 58,877 58,877 58,877 58,877 58,877 58,877 58,877
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,264 20,264 20,264 20,264 20,264 20,264 20,264
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,377 24,377 24,377 24,377 24,377 24,377 24,377
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,410 26,410 26,410 26,410 26,410 26,410 26,410
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 34,002 34,002 34,002 34,002 34,002 34,002 34,002
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,450 22,450 22,450 22,450 22,450 22,450 22,450
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,853 52,853 52,853 52,853 52,853 52,853 52,853
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 362,102 362,102 362,102 362,102 362,102 362,102 362,102
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 413,890 413,890 413,890 413,890 413,890 413,890 413,890
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 275,159 275,159 275,159 275,159 275,159 275,159 275,159
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 293,982 293,982 293,982 293,982 293,982 293,982 293,982
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 468,883 530,472 456,998 485,091 495,896 463,481 479,689
8.2 CONCRETO 3500 PSI M3 ### 409,619 466,068 398,726 424,474 434,378 404,668 419,523
8.3 CONCRETO 3000 PSI M3 ### 407,528 465,531 396,335 422,792 432,968 402,441 417,704
8.4 CONCRETO 2500 PSI M3 ### 363,768 423,692 352,204 379,537 390,051 358,512 374,281
8.5 CONCRETO 2000 PSI M3 ### 339,676 400,657 327,909 355,724 366,422 334,328 350,375
8.6 CONCRETO 1500 PSI M3 ### 308,932 370,895 296,975 325,238 336,109 303,497 319,803
8.7 MORTERO SECO 1:10 M3 ### 270,257 325,035 259,686 284,673 294,283 265,452 279,867
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 483,345 536,535 473,081 497,343 506,675 478,679 492,677
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 407,644 445,084 400,419 417,496 424,066 404,360 414,212
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 470,627 505,643 463,870 479,842 485,986 467,556 476,770
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 700,467 735,483 693,710 709,682 715,826 697,396 706,610
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 125,134 125,134 125,134 125,134 125,134 125,134 125,134
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,225 4,622 4,148 4,329 4,399 4,190 4,295
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### p 140,017 140,017 140,017 140,017 140,017 140,017 140,017
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### i 171,480 171,480 171,480 171,480 171,480 171,480 171,480
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ###
o 249,310 249,310 249,310 249,310 249,310 249,310 249,310
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 277,490 277,490 277,490 277,490 277,490 277,490 277,490
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 305,703 305,703 305,703 305,703 305,703 305,703 305,703
9.8 HOJA PUERTA FORTEC 0.81 UN ### 203,024 203,024 203,024 203,024 203,024 203,024 203,024
9.9 HOJA PUERTA FORTEC 0.91 UN ### 230,166 230,166 230,166 230,166 230,166 230,166 230,166
9.10 HOJA PUERTA FORTEC 1.50 UN ### 338,732 338,732 338,732 338,732 338,732 338,732 338,732
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 128,384 128,384 128,384 128,384 128,384 128,384 128,384
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 170,454 170,454 170,454 170,454 170,454 170,454 170,454
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 189,453 189,453 189,453 189,453 189,453 189,453 189,453
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 482,584 482,584 482,584 482,584 482,584 482,584 482,584
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,755 42,755 42,755 42,755 42,755 42,755 42,755
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,622 26,622 26,622 26,622 26,622 26,622 26,622
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 101,075 101,075 101,075 101,075 101,075 101,075 101,075
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 123,447 123,447 123,447 123,447 123,447 123,447 123,447
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 95,898 95,898 95,898 95,898 95,898 95,898 95,898
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,727 29,727 29,727 29,727 29,727 29,727 29,727
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,727 29,727 29,727 29,727 29,727 29,727 29,727
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,180 28,180 28,180 28,180 28,180 28,180 28,180
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 43,096 43,096 43,096 43,096 43,096 43,096 43,096
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 53,377 53,377 53,377 53,377 53,377 53,377 53,377
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 64,341 64,341 64,341 64,341 64,341 64,341 64,341
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 77,363 77,363 77,363 77,363 77,363 77,363 77,363
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 364,453 364,453 364,453 364,453 364,453 364,453 364,453
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 254,802 254,802 254,802 254,802 254,802 254,802 254,802
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 34,187 34,187 34,187 34,187 34,187 34,187 34,187
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 43,782 43,782 43,782 43,782 43,782 43,782 43,782
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 53,377 53,377 53,377 53,377 53,377 53,377 53,377
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 67,083 67,083 67,083 67,083 67,083 67,083 67,083
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 77,286 77,286 77,286 77,286 77,286 77,286 77,286
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 215,118 215,118 215,118 215,118 215,118 215,118 215,118
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO) ML ### 81,806 81,806 81,806 81,806 81,806 81,806 81,806
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 146,346 146,346 146,346 146,346 146,346 146,346 146,346
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### p 138,693 138,693 138,693 138,693 138,693 138,693 138,693
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### i 91,058 91,058 91,058 91,058 91,058 91,058 91,058
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ###
o 214,637 214,637 214,637 214,637 214,637 214,637 214,637
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 111,787 111,787 111,787 111,787 111,787 111,787 111,787
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,705 6,705 6,705 6,705 6,705 6,705 6,705
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 100,897 100,897 100,897 100,897 100,897 100,897 100,897
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA)
10,10(1) H: 2.00 MTS M2 ### 122,945 122,945 122,945 122,945 122,945 122,945 122,945
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,546 41,546 41,546 41,546 41,546 41,546 41,546
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 548,571 548,571 548,571 548,571 548,571 548,571 548,571
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 197,244 197,244 197,244 197,244 197,244 197,244 197,244
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA M2 ### 221,272 221,272 221,272 221,272 221,272 221,272 221,272
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 130,249 130,249 130,249 130,249 130,249 130,249 130,249
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 400,080 400,080 400,080 400,080 400,080 400,080 400,080
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,126 6,126 6,126 6,126 6,126 6,126 6,126
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 281,315 281,315 281,315 281,315 281,315 281,315 281,315
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 124,009 124,009 124,009 124,009 124,009 124,009 124,009
10.21 REJILLA PISO 0.30 M M2 ### 87,611 87,611 87,611 87,611 87,611 87,611 87,611
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 90,424 90,424 90,424 90,424 90,424 90,424 90,424
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,721 10,721 10,721 10,721 10,721 10,721 10,721
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS
10.24 DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 11,897 11,897 11,897 11,897 11,897 11,897 11,897
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO,
MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA p
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, i
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### o 9,454 9,454 9,454 9,454 9,454 9,454 9,454
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,696 62,696 62,696 62,696 62,696 62,696 62,696
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,953 62,953 62,953 62,953 62,953 62,953 62,953
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### p 40,617 40,617 40,617 40,617 40,617 40,617 40,617
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### i 50,062 50,062 50,062 50,062 50,062 50,062 50,062
o
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA
11.57 2" ML ### 4,243 4,243 4,243 4,243 4,243 4,243 4,243
11.59 GABINETE TIPO III UN ### 1,033,105 1,033,105 1,033,105 1,033,105 1,033,105 1,033,105 1,033,105
11.60 GABINETE TIPO I UN ### 789,101 789,101 789,101 789,101 789,101 789,101 789,101
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,654,227 2,654,227 2,654,227 2,654,227 2,654,227 2,654,227 2,654,227
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,212,816 2,212,816 2,212,816 2,212,816 2,212,816 2,212,816 2,212,816
11.63 VÁLVULA MARIPOSA 3" UN ### 642,158 642,158 642,158 642,158 642,158 642,158 642,158
11.64 VÁLVULA MARIPOSA 4" UN ### 831,065 831,065 831,065 831,065 831,065 831,065 831,065
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 320,069 320,069 320,069 320,069 320,069 320,069 320,069
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 369,823 369,823 369,823 369,823 369,823 369,823 369,823
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 58,763 58,763 58,763 58,763 58,763 58,763 58,763
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 69,567 69,567 69,567 69,567 69,567 69,567 69,567
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 77,230 77,230 77,230 77,230 77,230 77,230 77,230
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 90,965 90,965 90,965 90,965 90,965 90,965 90,965
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,243 55,243 55,243 55,243 55,243 55,243 55,243
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 62,963 62,963 62,963 62,963 62,963 62,963 62,963
12.8 STRIP TELEFÓNICO 10 PARES UN ### 145,341 145,341 145,341 145,341 145,341 145,341 145,341
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 56,727 56,727 56,727 56,727 56,727 56,727 56,727
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 130,370 130,370 130,370 130,370 130,370 130,370 130,370
12.11 SALIDA T.V PVC COMPLETA. UN ### 77,955 77,955 77,955 77,955 77,955 77,955 77,955
12.12 SALIDA BIFÁSICA C.N. UN ### 46,232 46,232 46,232 46,232 46,232 46,232 46,232
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 97,429 97,429 97,429 97,429 97,429 97,429 97,429
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 415,993 415,993 415,993 415,993 415,993 415,993 415,993
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 554,121 554,121 554,121 554,121 554,121 554,121 554,121
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,588 3,588 3,588 3,588 3,588 3,588 3,588
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,738 4,738 4,738 4,738 4,738 4,738 4,738
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,372 7,372 7,372 7,372 7,372 7,372 7,372
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,185 13,185 13,185 13,185 13,185 13,185 13,185
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 277,059 277,059 277,059 277,059 277,059 277,059 277,059
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 78,271 78,271 78,271 78,271 78,271 78,271 78,271
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### p 105,980 105,980 105,980 105,980 105,980 105,980 105,980
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### i 43,214 43,214 43,214 43,214 43,214 43,214 43,214
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG
o
UN ### 1,420,020 1,420,020 1,420,020 1,420,020 1,420,020 1,420,020 1,420,020
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,052,341 1,052,341 1,052,341 1,052,341 1,052,341 1,052,341 1,052,341
12.26 POSTE METÁLICO 6M UN ### 1,316,549 1,316,549 1,316,549 1,316,549 1,316,549 1,316,549 1,316,549
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 612,714 612,714 612,714 612,714 612,714 612,714 612,714
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 111,818 111,818 111,818 111,818 111,818 111,818 111,818
12.29 LUMINARIA 70W SODIO UN ### 514,087 514,087 514,087 514,087 514,087 514,087 514,087
12.30 LUMINARIA 150W SODIO UN ### 643,181 643,181 643,181 643,181 643,181 643,181 643,181
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,698,893 1,698,893 1,698,893 1,698,893 1,698,893 1,698,893 1,698,893
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,251,057 1,251,057 1,251,057 1,251,057 1,251,057 1,251,057 1,251,057
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 39,847 41,194 39,587 40,201 40,438 39,729 40,083
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,597 40,943 39,337 39,951 40,187 39,479 39,833
13.3 ALISTADO PARA LISTÓN M2 ### 14,805 15,074 14,753 14,876 14,923 14,781 14,852
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 27,493 30,186 26,973 28,202 28,674 27,256 27,965
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 85,574 88,268 85,054 86,283 86,755 85,338 86,047
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,083 28,302 26,847 27,404 27,618 26,976 27,297
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 59,163 65,156 58,007 60,740 61,792 58,638 60,215
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 82,235 91,823 80,385 84,758 86,440 81,394 83,917
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,943 30,943 30,943 30,943 30,943 30,943 30,943
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,371 23,371 23,371 23,371 23,371 23,371 23,371
13.11 PERMA PLY 2 CAPAS M2 ### 27,419 27,419 27,419 27,419 27,419 27,419 27,419
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 48,227 53,620 47,186 49,646 50,592 47,754 49,173
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 56,544 63,136 55,272 58,278 59,435 55,966 57,700
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 82,059 92,246 80,093 84,740 86,527 81,166 83,846
13.15 TRITURADO FINO 1/2 M3 ### 106,952 150,758 98,499 118,480 126,166 103,110 114,638
13.16 TRITURADO GRUESO 3/4 M3 ### 105,615 153,369 100,693 124,989 126,895 108,045 121,450
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 58,128 58,667 58,024 58,270 58,365 58,081 58,223
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,736 35,005 34,684 34,807 34,854 34,713 34,783
14.3 ADOQUÍN CONCRETO 6CM M2 ### 66,173 67,519 65,913 66,527 66,763 66,055 66,409
14.4 ADOQUÍN CONCRETO 8CM M2 ### 69,573 70,919 69,313 69,927 70,163 69,455 69,809
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
14.5 ADOQUÍN GRES PEATONAL M2 ### p 73,904 75,250 73,644 74,258 74,494 73,786 74,140
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO i
14.6 BLANCO. INCLUYE ALISTADO M2 ### o 76,750 77,288 76,646 76,891 76,986 76,702 76,844
14.7 GRAVILLA PARA GRADAS ML ### 37,639 38,316 37,509 37,817 37,936 37,580 37,758
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 166,618 169,042 166,150 167,256 167,681 166,405 167,043
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 46,857 48,479 46,544 47,284 47,568 46,715 47,142
14.10 GUARDAESCOBA EN GRANITO ML ### 44,626 44,626 44,626 44,626 44,626 44,626 44,626
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,280 10,956 10,149 10,458 10,576 10,220 10,398
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,597 9,597 9,597 9,597 9,597 9,597 9,597
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,885 12,885 12,885 12,885 12,885 12,885 12,885
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,744 10,744 10,744 10,744 10,744 10,744 10,744
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,011 18,011 18,011 18,011 18,011 18,011 18,011
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,110 35,110 35,110 35,110 35,110 35,110 35,110
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,381 9,381 9,381 9,381 9,381 9,381 9,381
14.18 LISTÓN M.H. AMARILLO M2 ### 75,959 75,959 75,959 75,959 75,959 75,959 75,959
14.19 PASO ESCALERA GRANITO ML ### 120,261 122,147 119,897 120,757 121,088 120,096 120,592
14.20 PIRLANES ALUMINIO ML ### 7,664 7,664 7,664 7,664 7,664 7,664 7,664
14.21 PIRLANES LADRILLO ML ### 33,004 33,798 32,851 33,213 33,352 32,934 33,143
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 46,926 46,926 46,926 46,926 46,926 46,926 46,926
14.23 PISO VINILO TRÁFICO PESADO M2 ### 54,546 54,546 54,546 54,546 54,546 54,546 54,546
14.24 PULIDA LACADA PISO MADERA M2 ### 50,191 50,191 50,191 50,191 50,191 50,191 50,191
14.25 TABLETA DE GRES 25X25 M2 ### 50,386 50,925 50,282 50,528 50,623 50,339 50,481
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,593 57,132 56,489 56,735 56,829 56,546 56,688
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,149 11,149 11,149 11,149 11,149 11,149 11,149
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 51,173 52,363 50,943 51,486 51,695 51,068 51,381
14.29 JABONERA PORCELANA ACUARIO UN ### 21,077 21,077 21,077 21,077 21,077 21,077 21,077
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 126,174 126,174 126,174 126,174 126,174 126,174 126,174
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,133 10,133 10,133 10,133 10,133 10,133 10,133
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,000 23,000 23,000 23,000 23,000 23,000 23,000
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,747 14,747 14,747 14,747 14,747 14,747 14,747
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,327 14,327 14,327 14,327 14,327 14,327 14,327
14.35 REMATES BOCEL ALUMINIO ML ### 8,704 8,704 8,704 8,704 8,704 8,704 8,704
14.36 REMATES BOCEL PORCELANA ML ### 8,857 8,857 8,857 8,857 8,857 8,857 8,857
14.37 TAPA REGISTRO 20X20 UN ### 19,482 19,482 19,482 19,482 19,482 19,482 19,482
14.38 TAPA REGISTRO 6X6 UN ### 17,753 17,753 17,753 17,753 17,753 17,753 17,753
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### i 19,135 19,135 19,135 19,135 19,135 19,135 19,135
o
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO M2 ### 22,120 22,120 22,120 22,120 22,120 22,120 22,120
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 66,521 67,059 66,417 66,663 66,757 66,474 66,615
14.42 MEDIA CAÑA EN GRANITO ML ### 79,317 79,317 79,317 79,317 79,317 79,317 79,317
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,692 34,692 34,692 34,692 34,692 34,692 34,692
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,554 13,554 13,554 13,554 13,554 13,554 13,554
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 104,221 104,221 104,221 104,221 104,221 104,221 104,221
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 126,107 126,107 126,107 126,107 126,107 126,107 126,107
15 CIELO RASO
15.1 APLIQUE YESO ML ### 74,518 74,518 74,518 74,518 74,518 74,518 74,518
15.2 ARMADURA MADERA Y MALLA M2 ### 36,595 36,595 36,595 36,595 36,595 36,595 36,595
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 56,610 56,610 56,610 56,610 56,610 56,610 56,610
15.4 CIELO RASO DURACUSTIC M2 ### 69,490 69,490 69,490 69,490 69,490 69,490 69,490
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,856 51,856 51,856 51,856 51,856 51,856 51,856
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 96,198 96,198 96,198 96,198 96,198 96,198 96,198
15.7 CORNISAS YESO ML ### 50,025 50,025 50,025 50,025 50,025 50,025 50,025
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 106,355 106,355 106,355 106,355 106,355 106,355 106,355
15.9 MALLA CON VENA M2 ### 13,695 13,695 13,695 13,695 13,695 13,695 13,695
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
16.2 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 75,369 126,771 83,936 118,204 99,357 99,357 116,491
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### p 110,017 154,785 101,378 121,798 129,652 106,090 117,871
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO i
16.10 MECÁNICAMENTE M3 ### o 185,925 264,804 204,835 184,274 263,091 221,969 256,237
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 64,799 116,201 73,366 107,634 88,787 88,787 105,921
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 159,397 233,970 174,001 153,440 232,257 191,135 225,403
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 182,894 261,773 201,804 181,243 260,060 218,938 253,206
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 308,940 308,940 308,940 308,940 308,940 308,940 308,940
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 493,560 493,560 493,560 493,560 493,560 493,560 493,560
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 142,933 142,933 142,933 142,933 142,933 142,933 142,933
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 409,556 409,556 409,556 409,556 409,556 409,556 409,556
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 297,461 297,461 297,461 297,461 297,461 297,461 297,461
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,480 8,480 8,480 8,480 8,480 8,480 8,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### p 3,146 3,146 3,146 3,146 3,146 3,146 3,146
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### i 11,284 11,284 11,284 11,284 11,284 11,284 11,284
18.4 BARNIZ SOBRE MUEBLES M2 ###
o 42,981 42,981 42,981 42,981 42,981 42,981 42,981
18.5 CARBURO SOBRE PAÑETES M2 ### 5,916 5,916 5,916 5,916 5,916 5,916 5,916
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 67,173 67,173 67,173 67,173 67,173 67,173 67,173
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,516 3,516 3,516 3,516 3,516 3,516 3,516
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,822 2,822 2,822 2,822 2,822 2,822 2,822
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,155 14,155 14,155 14,155 14,155 14,155 14,155
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,102 4,102 4,102 4,102 4,102 4,102 4,102
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,926 14,926 14,926 14,926 14,926 14,926 14,926
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,854 5,854 5,854 5,854 5,854 5,854 5,854
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,659 6,659 6,659 6,659 6,659 6,659 6,659
18.14 ESTUCO M2 ### 7,110 7,110 7,110 7,110 7,110 7,110 7,110
18.15 ESTUCO (LINEAL) ML ### 4,450 4,450 4,450 4,450 4,450 4,450 4,450
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,751 15,751 15,751 15,751 15,751 15,751 15,751
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,754 9,754 9,754 9,754 9,754 9,754 9,754
18.18 LACA PISOS MADERA M2 ### 23,062 23,062 23,062 23,062 23,062 23,062 23,062
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,725 2,725 2,725 2,725 2,725 2,725 2,725
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,401 12,401 12,401 12,401 12,401 12,401 12,401
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,345 3,345 3,345 3,345 3,345 3,345 3,345
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,794 12,794 12,794 12,794 12,794 12,794 12,794
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,192 7,192 7,192 7,192 7,192 7,192 7,192
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,516 4,516 4,516 4,516 4,516 4,516 4,516
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,202 22,202 22,202 22,202 22,202 22,202 22,202
18.26 PINTURA EPÓXICA M2 ### 12,861 12,861 12,861 12,861 12,861 12,861 12,861
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,940 7,940 7,940 7,940 7,940 7,940 7,940
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,205,579 6,205,579 6,205,579 6,205,579 6,205,579 6,205,579 6,205,579
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,964,286 10,964,286 10,964,286 10,964,286 10,964,286 10,964,286 10,964,286
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,869,340 2,869,340 2,869,340 2,869,340 2,869,340 2,869,340 2,869,340
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,377,256 9,377,256 9,377,256 9,377,256 9,377,256 9,377,256 9,377,256
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,781,690 8,781,690 8,781,690 8,781,690 8,781,690 8,781,690 8,781,690
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,725 2,725 2,725 2,725 2,725 2,725 2,725
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 880,441 880,441 880,441 880,441 880,441 880,441 880,441
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 87,999 87,999 87,999 87,999 87,999 87,999 87,999
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### p 1,593,659 1,594,275 1,593,540 1,593,821 1,593,929 1,593,605 1,593,767
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### i 691,169 705,670 688,371 694,985 697,529 689,897 693,713
o
20 INSTALACIONES RED GASES
20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,860 29,860 29,860 29,860 29,860 29,860 29,860
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,436 44,436 44,436 44,436 44,436 44,436 44,436
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 55,115 55,115 55,115 55,115 55,115 55,115 55,115
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 17,910 17,910 17,910 17,910 17,910 17,910 17,910
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,715 21,715 21,715 21,715 21,715 21,715 21,715
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,630 29,630 29,630 29,630 29,630 29,630 29,630
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,429 26,429 26,429 26,429 26,429 26,429 26,429
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,867 27,867 27,867 27,867 27,867 27,867 27,867
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,870 34,870 34,870 34,870 34,870 34,870 34,870
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,998 17,998 17,998 17,998 17,998 17,998 17,998
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,602 23,602 23,602 23,602 23,602 23,602 23,602
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,325 36,325 36,325 36,325 36,325 36,325 36,325
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 278,697 278,697 278,697 278,697 278,697 278,697 278,697
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 320,783 320,783 320,783 320,783 320,783 320,783 320,783
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 334,519 334,519 334,519 334,519 334,519 334,519 334,519
20.16 ACOMETIDA GAS 1/2" ML ### 310,170 310,170 310,170 310,170 310,170 310,170 310,170
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,882 10,882 10,882 10,882 10,882 10,882 10,882
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,861 24,861 24,861 24,861 24,861 24,861 24,861
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 94,409 139,065 85,792 106,160 113,996 90,492 102,244
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 70,335 121,737 78,902 113,170 94,323 94,323 111,457
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 69,859 121,261 78,426 112,694 93,847 93,847 110,981
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 108,126 126,574 106,077 109,151 126,574 106,077 129,648
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 58,126 76,932 56,037 59,171 76,932 56,037 80,066
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 118,292 169,894 108,334 131,872 140,925 113,765 127,345
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 116,610 116,610 116,610 116,610 116,610 116,610 116,610
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,215,957 1,215,957 1,215,957 1,215,957 1,215,957 1,215,957 1,215,957
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 152,396 152,396 152,396 152,396 152,396 152,396 152,396
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,408,391 1,408,391 1,408,391 1,408,391 1,408,391 1,408,391 1,408,391
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 981,623 981,623 981,623 981,623 981,623 981,623 981,623
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,873 62,873 62,873 62,873 62,873 62,873 62,873
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 115,757 115,757 115,757 115,757 115,757 115,757 115,757
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 273,358 273,358 273,358 273,358 273,358 273,358 273,358
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 273,351 273,351 273,351 273,351 273,351 273,351 273,351
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 438,867 438,867 438,867 438,867 438,867 438,867 438,867
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 115,806 115,806 115,806 115,806 115,806 115,806 115,806
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 115,806 115,806 115,806 115,806 115,806 115,806 115,806
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 273,358 273,358 273,358 273,358 273,358 273,358 273,358
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 273,358 273,358 273,358 273,358 273,358 273,358 273,358
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 438,867 438,867 438,867 438,867 438,867 438,867 438,867
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 440,630 440,630 440,630 440,630 440,630 440,630 440,630
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 715,521 715,521 715,521 715,521 715,521 715,521 715,521
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,148,394 1,148,394 1,148,394 1,148,394 1,148,394 1,148,394 1,148,394
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 70,958 70,958 70,958 70,958 70,958 70,958 70,958
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 368,704 368,704 368,704 368,704 368,704 368,704 368,704
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### p 413,420 413,420 413,420 413,420 413,420 413,420 413,420
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### i 1,144,263 1,144,263 1,144,263 1,144,263 1,144,263 1,144,263 1,144,263
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
o 67,143 67,675 67,040 67,283 67,376 67,096 67,236
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 334,237 334,237 334,237 334,237 334,237 334,237 334,237
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 50,862 50,862 50,862 50,862 50,862 50,862 50,862
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 71,940 71,940 71,940 71,940 71,940 71,940 71,940
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 103,822 103,822 103,822 103,822 103,822 103,822 103,822
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 159,372 159,372 159,372 159,372 159,372 159,372 159,372
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 256,147 256,147 256,147 256,147 256,147 256,147 256,147
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 371,659 371,659 371,659 371,659 371,659 371,659 371,659
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 470,328 470,328 470,328 470,328 470,328 470,328 470,328
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 618,405 618,405 618,405 618,405 618,405 618,405 618,405
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 850,646 850,646 850,646 850,646 850,646 850,646 850,646
5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### p 75,356 78,134 74,819 76,087 76,574 75,112 75,843
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### i 89,084 91,862 88,547 89,815 90,302 88,840 89,571
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ###
o 57,247 63,539 56,033 58,903 60,007 56,695 58,351
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 61,842 67,932 60,667 63,445 64,513 61,308 62,910
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 62,061 67,989 60,918 63,621 64,661 61,542 63,101
5.6 BORDE SEPARADOR VERDE A-170 ML ### 257,093 257,793 256,957 257,277 257,400 257,031 257,215
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,610 19,365 18,464 18,808 18,941 18,544 18,742
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,945 45,379 40,089 42,112 42,890 40,556 41,723
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 84,235 84,609 84,162 84,333 84,399 84,202 84,300
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 559,090 569,996 556,986 561,960 563,874 558,134 561,004
5.11 LOSETA PREFABRICADA A-40 M2 ### 62,440 64,043 62,131 62,862 63,143 62,300 62,722
5.12 LOSETA PREFABRICADA A-60 M2 ### 91,095 92,698 90,786 91,517 91,798 90,955 91,376
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 33,914 36,350 33,444 34,555 34,982 33,700 34,341
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 54,706 59,636 53,754 56,003 56,868 54,273 55,571
5.15 SARDINEL PREFABRICADO A-10 ML ### 104,716 114,964 107,553 105,335 114,555 109,582 113,661
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,418 61,388 60,231 60,674 60,844 60,333 60,589
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 205,779 208,679 205,219 206,542 207,051 205,524 206,287
6.2 BANCA EN CONCRETO M-30 UN ### 675,757 679,817 674,973 676,825 677,538 675,401 676,469
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 217,425 218,035 217,307 217,586 217,693 217,372 217,532
6.4 BOLARDO M-60 CONCRETO UN ### 164,129 167,610 163,458 165,045 165,656 163,824 164,740
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 165,997 169,477 165,326 166,913 167,524 165,692 166,608
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 194,691 198,350 193,985 195,654 196,296 194,370 195,333
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 60,209 62,337 59,798 60,769 61,142 60,022 60,582
6.8 BORDILLO PREFABRICADO A-80 ML ### 69,835 72,216 69,375 70,461 70,879 69,626 70,252
6.9 CANECA M-120 UN ### 316,142 316,674 316,039 316,282 316,375 316,095 316,235
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 833,220 834,960 832,884 833,678 833,983 833,067 833,525
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,420,128 3,421,288 3,419,904 3,420,433 3,420,637 3,420,026 3,420,332
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,518,359 3,519,519 3,518,135 3,518,664 3,518,868 3,518,257 3,518,563
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 491,941 493,160 491,705 492,262 492,476 491,834 492,155
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 652,058 656,937 651,117 653,342 654,198 651,631 652,914
6.15 BANCA EN MADERA M-50 UN ### 541,109 541,109 541,109 541,109 541,109 541,109 541,109
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 250,774 252,515 250,439 251,232 251,538 250,622 251,080
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 583,143 584,473 582,887 583,493 583,727 583,027 583,377
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
6.18 POSTE HISTÓRICO M-131 UN ### p 6,502,187 6,510,887 6,500,508 6,504,476 6,506,003 6,501,424 6,503,713
i
7 SEÑALIZACIÓN
o
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,086 4,086 4,086 4,086 4,086 4,086 4,086
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,800 43,800 43,800 43,800 43,800 43,800 43,800
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 317,078 317,428 317,010 317,170 317,232 317,047 317,139
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 499,927 502,366 499,456 500,569 500,997 499,713 500,355
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 236,924 237,274 236,857 237,016 237,078 236,893 236,986
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 251,662 252,012 251,595 251,754 251,816 251,631 251,724
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 262,823 263,173 262,756 262,915 262,977 262,792 262,885
7.8 TACHAS REFLECTIVAS UN ### 13,700 13,700 13,700 13,700 13,700 13,700 13,700
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,632 14,632 14,632 14,632 14,632 14,632 14,632
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 119,151 119,151 119,151 119,151 119,151 119,151 119,151
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,493 35,493 35,493 35,493 35,493 35,493 35,493
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,540 14,540 14,540 14,540 14,540 14,540 14,540
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,569 19,569 19,569 19,569 19,569 19,569 19,569
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 23,458 23,458 23,458 23,458 23,458 23,458 23,458
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 30,144 30,144 30,144 30,144 30,144 30,144 30,144
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800
4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 7,318 7,318 7,318 7,318 7,318 7,318 7,318
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
CONSTRUCCIÓN
URBANISMO
E BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
p CONSTRUCCIÓN
i
1 PRELIMINARES o
1.1 CAMPAMENTO 18 M2 UN ### 2,027,566 2,036,962 2,007,991 2,034,613 2,043,226 2,014,795 2,034,613
1.2 CAMPAMENTO 9 M2 UN ### 1,180,598 1,185,296 1,170,811 1,184,122 1,188,428 1,174,213 1,184,122
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,162 14,162 14,162 14,162 14,162 14,162 14,162
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,876 15,876 15,876 15,876 15,876 15,876 15,876
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,360 18,360 18,360 18,360 18,360 18,360 18,360
1.6 CERCA EN TABLA H=2.30 M ML ### 65,829 65,829 65,829 65,829 65,829 65,829 65,829
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,418 46,506 46,235 46,484 46,564 46,330 46,484
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,607 21,695 21,424 21,673 21,753 21,520 21,673
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2### p 10,480 10,480 10,480 10,480 10,480 10,480 10,480
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2### i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
1.37 DESMONTE MUROS SECOS M2### o 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 908,595 909,969 905,275 909,053 911,051 908,715 909,750
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2### 10,434 10,434 10,434 10,434 10,434 10,434 10,434
1.42 REPLANTEO MANUAL DE CIMIENTOS M2### 3,763 3,763 3,763 3,763 3,763 3,763 3,763
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,693,416 2,693,416 2,693,416 2,693,416 2,693,416 2,693,416 2,693,416
1.44 RED TELEFÓNICA PROVISIONAL UN ### 249,178 249,178 249,178 249,178 249,178 249,178 249,178
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE) M3### 9,189 9,189 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3### 114,774 123,341 89,073 111,347 131,908 131,908 140,475
2.2 BASE ARENA CEMENTO 1:20 M3### 186,188 186,188 186,188 186,188 186,188 175,111 186,188
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2### 22,207 22,207 22,207 22,207 22,207 22,207 22,207
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3### 659,025 668,058 640,207 665,800 674,079 648,929 665,800
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3### 658,204 666,932 640,021 664,750 672,750 650,000 664,750
2.8 ZAPATAS EN CONCRETO 3500 PSI M3### 613,121 621,294 596,095 619,251 626,742 605,439 619,251
2.9 PILOTE DE MADERA D=20 CM ML ### 49,721 49,721 49,721 49,721 49,721 49,721 49,721
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM) ML ### 153,347 153,347 153,347 153,347 153,347 153,347 153,347
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2.11 UNA DISTANCIA MENOR DE 5 KM) ML ### 191,390 191,390 191,390 191,390 191,390 191,390 191,390
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2.12 UNA DISTANCIA MENOR DE 5 KM)
ML ### 237,396 237,396 237,396 237,396 237,396 237,396 237,396
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2.13 UNA DISTANCIA MENOR DE 5 KM) ML ### 299,327 299,327 299,327 299,327 299,327 299,327 299,327
2.14 PILOTE HINCADO 25X25 ML ### 105,652 106,185 104,541 106,051 106,540 105,313 106,051
2.15 PILOTE HINCADO 30X30 ML ### 130,540 131,312 128,930 131,119 131,827 130,049 131,119
2.16 DADOS EN CONCRETO 3500PSI M3### 598,972 607,145 581,946 605,101 612,593 591,290 605,101
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM) ML ### 91,763 91,763 91,763 91,763 91,763 91,763 91,763
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS p
3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### i 38,382 38,382 38,382 38,382 38,382 38,313 38,382
3.2 SIFÓN EN PVC 6" UN ### o 198,627 198,627 198,627 198,627 198,627 198,558 198,627
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 474,186 481,134 455,926 474,648 487,142 476,508 480,429
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 229,910 231,406 226,472 230,632 232,520 228,272 231,119
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 262,820 265,038 257,699 263,854 266,699 260,352 264,620
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 346,129 349,495 338,615 348,024 351,921 341,180 348,790
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 104,939 104,989 104,790 104,919 105,039 105,039 104,989
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,288,965 1,289,462 1,287,472 1,288,766 1,289,960 1,289,960 1,289,462
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 114,933 114,933 114,933 114,933 114,933 114,173 114,933
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 72,614 72,614 72,614 72,614 72,614 72,213 72,614
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,883 29,144 28,339 29,079 29,318 28,339 29,079
3.12 TUBERÍA DRENAJE PVC 160 ML ### 45,948 46,209 45,404 46,144 46,383 45,404 46,144
3.13 TUBERÍA DRENAJE PVC 200 ML ### 60,373 60,739 59,612 60,647 60,982 59,612 60,647
3.14 TUBERÍA DRENAJE PVC 250 ML ### 82,328 82,746 81,458 82,641 83,024 81,458 82,641
3.15 TUBERÍA DRENAJE PVC 315 ML ### 113,142 113,507 112,380 113,416 113,751 112,380 113,416
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3.16 MATERIAL FILTRANTE) UN ### 975,092 979,268 966,392 978,224 982,052 966,392 978,224
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3.17 MATERIAL FILTRANTE) UN ### 1,387,115 1,395,467 1,369,715 1,393,379 1,401,035 1,369,715 1,393,379
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3.18 MATERIAL FILTRANTE) UN ### 1,827,493 1,844,197 1,792,693 1,840,021 1,855,333 1,792,693 1,840,021
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2### 42,356 42,356 42,356 42,356 42,356 42,356 42,356
4.2 CASETÓN DE LONA 0.80X0.70 M2### 55,913 55,913 55,913 55,913 55,913 55,913 55,913
4.3 COLUMNAS 3500 PSI M3### 819,657 827,831 802,632 825,787 833,278 811,976 825,787
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3### 260,447 283,949 248,049 282,462 280,812 263,033 277,447
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4.5 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2### 99,879 100,673 98,226 100,475 101,202 99,134 100,475
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.
4.6 MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2### 117,811 118,763 115,828 118,525 119,398 116,916 118,525
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO) M2### 131,722 132,991 129,077 132,674 133,838 130,529 132,674
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN
4.8 REFUERZO) M2### 138,993 140,342 136,183 140,004 141,241 137,725 140,004
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN
4.9 REFUERZO)
M2### 159,417 161,083 155,945 160,666 162,194 157,850 160,666
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
M2### p 177,380
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN
4.10 REFUERZO) 179,284 173,413 178,808 180,554 175,590 178,808
i
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN o
4.11 REFUERZO) M2### 196,901 199,043 192,438 198,508 200,471 194,887 198,508
4.12 ENTREPISO VIGUETA PLACA M2### 99,805 99,893 99,623 99,871 99,951 99,658 99,871
4.13 ESCALERA MACIZA 3500 PSI M3### 968,084 976,257 951,058 974,214 981,705 960,403 974,214
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2### 95,228 95,228 95,228 95,228 95,228 95,530 95,228
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2### 80,694 81,511 78,991 81,307 82,056 79,926 81,307
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2### 90,873 91,873 88,791 91,623 92,540 89,934 91,623
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2### 106,013 107,267 103,401 106,953 108,102 104,835 106,953
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3### 718,789 726,962 701,763 724,919 732,410 711,108 724,919
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4.19 M) UN ### 49,706 49,932 49,236 49,875 50,082 49,563 49,875
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2### 287,151 290,801 279,547 289,888 293,234 283,720 289,888
4.21 ACERO FIGURADO 37000 PSI KG ### 4,205 4,205 4,205 4,205 4,205 4,205 4,205
4.22 ACERO FIGURADO 60000 PSI KG ### 4,410 4,410 4,410 4,410 4,410 4,410 4,410
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,185 6,185 6,185 6,185 6,185 6,185 6,185
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3### 865,899 874,073 848,874 872,029 879,520 858,218 872,029
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3### 791,291 800,253 772,621 798,012 806,227 782,822 798,012
4.26 VIGA AÉREA 3500 PSI M3### 859,894 868,067 842,869 866,024 873,515 852,213 866,024
4.27 VIGA CINTA 3500 PSI M3### 839,816 847,989 822,790 845,946 853,437 832,134 845,946
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3### 1,050,348 1,058,521 1,033,322 1,056,477 1,063,968 1,042,666 1,056,477
4.29 BASE EN CONCRETO POBRE 1500 PSI M3### 345,032 355,785 322,630 353,097 362,954 330,417 353,097
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,843 29,993 29,529 29,955 30,093 29,678 29,955
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 50,229 50,380 49,916 50,342 50,480 50,065 50,342
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,100 35,100 35,100 35,100 35,100 35,031 35,100
5.4 ARCOS EN LADRILLO PRENSADO ML ### 164,442 164,442 164,442 164,442 164,442 164,304 164,442
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,494 44,719 44,024 44,663 44,870 44,350 44,663
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,832 26,832 26,832 26,832 26,832 27,134 26,832
5.7 ENCHAPES LADRILLO PRENSADO M2### 99,299 99,299 99,299 99,299 99,299 99,024 99,299
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2### 91,984 92,735 90,418 92,547 93,236 91,506 92,547
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2### 91,843 91,843 91,843 91,843 91,843 91,843 91,843
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,845 53,845 53,845 53,845 53,845 53,845 53,845
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2### 88,447 88,447 88,447 88,447 88,447 88,447 88,447
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,147 52,147 52,147 52,147 52,147 52,147 52,147
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2### p 102,566 102,566 102,566 102,566 102,566 102,566 102,566
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### i 60,528 60,528 60,528 60,528 60,528 60,528 60,528
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2### o 114,087 114,087 114,087 114,087 114,087 114,087 114,087
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,289 66,289 66,289 66,289 66,289 66,289 66,289
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2### 40,792 40,792 40,792 40,792 40,792 40,654 40,792
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,710 24,710 24,710 24,710 24,710 24,641 24,710
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2### 53,250 53,250 53,250 53,250 53,250 53,158 53,250
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,005 32,005 32,005 32,005 32,005 31,958 32,005
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2### 59,906 59,906 59,906 59,906 59,906 59,814 59,906
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,006 36,006 36,006 36,006 36,006 35,960 36,006
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2### 99,237 99,237 99,237 99,237 99,237 98,776 99,237
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,698 58,698 58,698 58,698 58,698 58,467 58,698
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2### 37,418 37,418 37,418 37,418 37,418 37,326 37,418
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,690 22,690 22,690 22,690 22,690 22,644 22,690
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2### 74,465 74,465 74,465 74,465 74,465 74,280 74,465
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,894 44,894 44,894 44,894 44,894 44,801 44,894
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2### 88,161 88,161 88,161 88,161 88,161 88,464 88,161
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,419 53,419 53,419 53,419 53,419 53,570 53,419
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2### 182,469 182,469 182,469 182,469 182,469 181,824 182,469
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 109,628 109,628 109,628 109,628 109,628 109,306 109,628
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2### 89,874 89,874 89,874 89,874 89,874 89,670 89,874
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,275 54,275 54,275 54,275 54,275 54,174 54,275
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2### 46,976 46,976 46,976 46,976 46,976 46,770 46,976
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,587 28,587 28,587 28,587 28,587 28,483 28,587
5.37 MURO TOLETE COMÚN 0.06 M M2### 33,893 33,893 33,893 33,893 33,893 33,800 33,893
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,652 20,652 20,652 20,652 20,652 20,606 20,652
5.39 MURO TOLETE COMÚN 0.12 M M2### 51,177 51,177 51,177 51,177 51,177 50,993 51,177
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,370 31,370 31,370 31,370 31,370 31,277 31,370
5.41 MURO TOLETE COMÚN 0.25 M M2### 98,810 98,810 98,810 98,810 98,810 98,533 98,810
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,153 60,153 60,153 60,153 60,153 60,015 60,153
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2### 72,132 72,132 72,132 72,132 72,132 71,948 72,132
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,553 43,553 43,553 43,553 43,553 43,461 43,553
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2### 151,410 151,410 151,410 151,410 151,410 150,765 151,410
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 92,105 92,105 92,105 92,105 92,105 91,782 92,105
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
5.47 REMATES LADRILLO PRENSADO ML ### p 31,868 31,868 31,868 31,868 31,868 31,799 31,868
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### i 36,249 36,249 36,249 36,249 36,249 36,103 36,249
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### o 61,354 61,354 61,354 61,354 61,354 61,159 61,354
5.50 LAVADA DE FACHADA M2### 5,250 5,250 5,250 5,250 5,250 5,250 5,250
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 50,591 50,742 50,278 50,704 50,842 50,427 50,704
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,613 10,613 10,613 10,613 10,613 10,613 10,613
5.53 ANCLAJE 3/8" L=30CM UN ### 14,001 14,001 14,001 14,001 14,001 14,001 14,001
5.54 ANCLAJE 1/2" L=50CM UN ### 18,290 18,290 18,290 18,290 18,290 18,290 18,290
5.55 ANCLAJE 5/8" L=70CM UN ### 25,567 25,567 25,567 25,567 25,567 25,567 25,567
5.56 ANCLAJE 3/4" L=70CM UN ### 38,074 38,074 38,074 38,074 38,074 38,074 38,074
5.57 ANCLAJE 1" L= 70CM UN ### 5,051 5,117 4,915 5,100 5,160 4,978 5,100
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2### 26,618 26,618 26,618 26,618 26,618 26,342 26,618
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE)
M2### 83,827 84,203 83,044 84,109 84,454 83,589 84,109
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,598 55,598 55,598 55,598 55,598 55,598 55,598
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,216 22,216 22,216 22,216 22,216 22,216 22,216
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,865 34,865 34,865 34,865 34,865 34,865 34,865
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 81,189 81,189 81,189 81,189 81,189 81,189 81,189
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,615 63,615 63,615 63,615 63,615 63,615 63,615
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,076 37,076 37,076 37,076 37,076 37,076 37,076
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 85,081 85,081 85,081 85,081 85,081 85,081 85,081
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 101,558 101,558 101,558 101,558 101,558 101,558 101,558
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 149,166 149,166 149,166 149,166 149,166 149,166 149,166
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 59,063 59,063 59,063 59,063 59,063 59,063 59,063
7.13 CANAL PVC AMAZONAS ML ### 82,139 82,139 82,139 82,139 82,139 82,139 82,139
7.14 CANAL PVC RAINGO ML ### 74,707 74,707 74,707 74,707 74,707 74,707 74,707
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2### 132,281 132,281 132,281 132,281 132,281 132,281 132,281
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2### 77,213 77,213 77,213 77,213 77,213 77,213 77,213
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2### 56,759 56,759 56,759 56,759 56,759 56,759 56,759
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,484 32,484 32,484 32,484 32,484 32,484 32,484
7.19 TEJA DE BARRO M2### 59,242 59,242 59,242 59,242 59,242 58,898 59,242
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2### 47,311 47,311 47,311 47,311 47,311 47,311 47,311
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2### 43,383 43,383 43,383 43,383 43,383 43,383 43,383
7.22 TEJA FIBROCEMENTO Nº4 M2### 36,711 36,711 36,711 36,711 36,711 36,711 36,711
7.23 TEJA FIBROCEMENTO No. 6 M2### 35,936 35,936 35,936 35,936 35,936 35,936 35,936
7.24 TEJA FIBROCEMENTO No. 8 M2### 36,206 36,206 36,206 36,206 36,206 36,206 36,206
7.25 TEJA TERMOACÚSTICA M2### 50,862 50,862 50,862 50,862 50,862 50,862 50,862
7.26 TEJA PLÁSTICA No.6 M2### 44,740 44,740 44,740 44,740 44,740 44,740 44,740
7.27 TEJA ESPAÑOLA ETERNIT M2### 81,746 81,746 81,746 81,746 81,746 81,746 81,746
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7.28 30MM M2### 150,774 150,774 150,774 150,774 150,774 150,774 150,774
7.29 TEJA SIN TRASLAPO M2### 67,843 67,843 67,843 67,843 67,843 67,843 67,843
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2### p 42,805 42,805 42,805 42,805 42,805 42,805 42,805
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2### i 33,496 33,496 33,496 33,496 33,496 33,496 33,496
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO o
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2### 58,230 58,230 58,230 58,230 58,230 58,230 58,230
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,138 20,138 20,138 20,138 20,138 20,138 20,138
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,189 24,189 24,189 24,189 24,189 24,189 24,189
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2### 26,182 26,182 26,182 26,182 26,182 26,182 26,182
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2### 33,662 33,662 33,662 33,662 33,662 33,662 33,662
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,267 22,267 22,267 22,267 22,267 22,267 22,267
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,399 52,399 52,399 52,399 52,399 52,399 52,399
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2### 356,888 356,888 356,888 356,888 356,888 356,888 356,888
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2### 411,159 411,159 411,159 411,159 411,159 411,159 411,159
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2### 271,832 271,832 271,832 271,832 271,832 271,832 271,832
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2### 290,254 290,254 290,254 290,254 290,254 290,254 290,254
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3### 462,019 469,744 445,924 467,813 474,895 457,112 467,813
8.2 CONCRETO 3500 PSI M3### 408,642 416,577 392,112 414,593 421,866 401,184 414,593
8.3 CONCRETO 3000 PSI M3### 410,403 419,173 392,133 416,981 425,019 400,601 416,981
8.4 CONCRETO 2500 PSI M3### 358,388 365,905 342,728 364,026 370,916 353,614 364,026
8.5 CONCRETO 2000 PSI M3### 341,163 349,932 322,893 347,740 355,779 332,418 347,740
8.6 CONCRETO 1500 PSI M3### 319,872 330,312 298,122 327,702 337,272 305,682 327,702
8.7 MORTERO SECO 1:10 M3### 230,614 230,614 230,614 230,614 230,614 221,119 230,614
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3### 442,584 442,584 442,584 442,584 442,584 433,365 442,584
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3### 400,668 400,668 400,668 400,668 400,668 393,885 400,668
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3### 462,947 462,947 462,947 462,947 462,947 456,603 462,947
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3### 689,347 689,347 689,347 689,347 689,347 683,003 689,347
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 123,746 123,746 123,746 123,746 123,746 123,746 123,746
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,921 3,921 3,921 3,921 3,921 3,852 3,921
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2### 138,598 138,598 138,598 138,598 138,598 138,598 138,598
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2### 169,592 169,592 169,592 169,592 169,592 169,592 169,592
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 245,993 245,993 245,993 245,993 245,993 245,993 245,993
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 273,763 273,763 273,763 273,763 273,763 273,763 273,763
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 301,566 301,566 301,566 301,566 301,566 301,566 301,566
9.8 HOJA PUERTA FORTEC 0.81 UN ### 200,191 200,191 200,191 200,191 200,191 200,191 200,191
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
9.9 HOJA PUERTA FORTEC 0.91 UN ### p 226,929 226,929 226,929 226,929 226,929 226,929 226,929
9.10 HOJA PUERTA FORTEC 1.50 UN ### i 333,876 333,876 333,876 333,876 333,876 333,876 333,876
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### o 126,665 126,665 126,665 126,665 126,665 126,665 126,665
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 168,107 168,107 168,107 168,107 168,107 168,107 168,107
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 186,823 186,823 186,823 186,823 186,823 186,823 186,823
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 475,583 475,583 475,583 475,583 475,583 475,583 475,583
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,326 42,326 42,326 42,326 42,326 42,326 42,326
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,434 26,434 26,434 26,434 26,434 26,434 26,434
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2### 100,076 100,076 100,076 100,076 100,076 100,076 100,076
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 121,708 121,708 121,708 121,708 121,708 121,708 121,708
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 94,570 94,570 94,570 94,570 94,570 94,570 94,570
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,385 29,385 29,385 29,385 29,385 29,385 29,385
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,385 29,385 29,385 29,385 29,385 29,385 29,385
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,861 27,861 27,861 27,861 27,861 27,861 27,861
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2### 42,637 42,637 42,637 42,637 42,637 42,637 42,637
9.24 ESPEJO BISELADO INCOLORO 4 MM M2### 52,764 52,764 52,764 52,764 52,764 52,764 52,764
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2### 63,565 63,565 63,565 63,565 63,565 63,565 63,565
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2### 76,393 76,393 76,393 76,393 76,393 76,393 76,393
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2### 359,345 359,345 359,345 359,345 359,345 359,345 359,345
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2### 251,327 251,327 251,327 251,327 251,327 251,327 251,327
9.29 VIDRIO TRANSPARENTE 3 MM M2### 33,861 33,861 33,861 33,861 33,861 33,861 33,861
9.30 VIDRIO TRANSPARENTE 4 MM M2### 43,312 43,312 43,312 43,312 43,312 43,312 43,312
9.31 VIDRIO TRANSPARENTE 5 MM M2### 52,764 52,764 52,764 52,764 52,764 52,764 52,764
9.32 VIDRIO TRANSPARENTE 6 MM M2### 66,265 66,265 66,265 66,265 66,265 66,265 66,265
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 76,468 76,468 76,468 76,468 76,468 76,468 76,468
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2### 212,245 212,245 212,245 212,245 212,245 212,245 212,245
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO) ML ### 81,030 81,030 81,030 81,030 81,030 81,030 81,030
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 145,279 145,279 145,279 145,279 145,279 145,279 145,279
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 137,294 137,294 137,294 137,294 137,294 137,294 137,294
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2### 90,146 90,146 90,146 90,146 90,146 90,146 90,146
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 212,316 212,316 212,316 212,316 212,316 212,316 212,316
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 110,677 110,677 110,677 110,677 110,677 110,677 110,677
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,645 6,645 6,645 6,645 6,645 6,645 6,645
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
M2### p 100,229
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2") 100,229 100,229 100,229 100,229 100,229 100,229
i
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) o
10,10(1) H: 2.00 MTS M2### 121,546 121,546 121,546 121,546 121,546 121,546 121,546
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,261 41,261 41,261 41,261 41,261 41,261 41,261
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10.12 E=6MM M2### 541,001 541,001 541,001 541,001 541,001 541,001 541,001
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2### 194,721 194,721 194,721 194,721 194,721 194,721 194,721
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA M2### 218,807 218,807 218,807 218,807 218,807 218,807 218,807
11.59 GABINETE TIPO III UN ### 1,020,196 1,020,196 1,020,196 1,020,196 1,020,196 1,020,196 1,020,196
11.60 GABINETE TIPO I UN ### 779,830 779,830 779,830 779,830 779,830 779,830 779,830
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,616,706 2,616,706 2,616,706 2,616,706 2,616,706 2,616,706 2,616,706
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### p 2,181,876 2,181,876 2,181,876 2,181,876 2,181,876 2,181,876 2,181,876
11.63 VÁLVULA MARIPOSA 3" UN ### i 634,648 634,648 634,648 634,648 634,648 634,648 634,648
11.64 VÁLVULA MARIPOSA 4" UN ### o 820,738 820,738 820,738 820,738 820,738 820,738 820,738
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 315,469 315,469 315,469 315,469 315,469 315,469 315,469
12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 365,300 365,300 365,300 365,300 365,300 365,300 365,300
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 58,039 58,039 58,039 58,039 58,039 58,039 58,039
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 68,681 68,681 68,681 68,681 68,681 68,681 68,681
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 76,287 76,287 76,287 76,287 76,287 76,287 76,287
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 89,818 89,818 89,818 89,818 89,818 89,818 89,818
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,583 54,583 54,583 54,583 54,583 54,583 54,583
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 62,202 62,202 62,202 62,202 62,202 62,202 62,202
12.8 STRIP TELEFÓNICO 10 PARES UN ### 143,746 143,746 143,746 143,746 143,746 143,746 143,746
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 56,034 56,034 56,034 56,034 56,034 56,034 56,034
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 128,740 128,740 128,740 128,740 128,740 128,740 128,740
12.11 SALIDA T.V PVC COMPLETA. UN ### 77,016 77,016 77,016 77,016 77,016 77,016 77,016
12.12 SALIDA BIFÁSICA C.N. UN ### 45,666 45,666 45,666 45,666 45,666 45,666 45,666
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 96,324 96,324 96,324 96,324 96,324 96,324 96,324
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 411,360 411,360 411,360 411,360 411,360 411,360 411,360
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 547,771 547,771 547,771 547,771 547,771 547,771 547,771
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,546 3,546 3,546 3,546 3,546 3,546 3,546
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,683 4,683 4,683 4,683 4,683 4,683 4,683
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,284 7,284 7,284 7,284 7,284 7,284 7,284
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,031 13,031 13,031 13,031 13,031 13,031 13,031
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 273,746 273,746 273,746 273,746 273,746 273,746 273,746
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 77,400 77,400 77,400 77,400 77,400 77,400 77,400
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 104,696 104,696 104,696 104,696 104,696 104,696 104,696
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,867 42,867 42,867 42,867 42,867 42,867 42,867
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,404,530 1,404,530 1,404,530 1,404,530 1,404,530 1,404,530 1,404,530
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,040,960 1,040,960 1,040,960 1,040,960 1,040,960 1,040,960 1,040,960
12.26 POSTE METÁLICO 6M UN ### 1,299,231 1,299,231 1,299,231 1,299,231 1,299,231 1,299,231 1,299,231
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 604,116 604,116 604,116 604,116 604,116 604,116 604,116
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 110,473 110,473 110,473 110,473 110,473 110,473 110,473
12.29 LUMINARIA 70W SODIO UN ### 506,803 506,803 506,803 506,803 506,803 506,803 506,803
12.30 LUMINARIA 150W SODIO UN ### 633,973 633,973 633,973 633,973 633,973 633,973 633,973
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,673,969 1,673,969 1,673,969 1,673,969 1,673,969 1,673,969 1,673,969
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### p 1,232,805 1,232,805 1,232,805 1,232,805 1,232,805 1,232,805 1,232,805
i
13 PISOS BASES o
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2### 39,418 39,418 39,418 39,418 39,418 39,174 39,418
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2### 39,084 39,084 39,084 39,084 39,084 38,840 39,084
13.3 ALISTADO PARA LISTÓN M2### 14,707 14,707 14,707 14,707 14,707 14,658 14,707
13.4 ALISTADO PISOS 1:3, E=0.04 M2### 27,054 27,054 27,054 27,054 27,054 26,566 27,054
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2### 84,351 84,351 84,351 84,351 84,351 83,863 84,351
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,088 27,264 26,723 27,220 27,381 26,914 27,220
13.7 CONCRETO BASE GRADAS 2500 PSI M2### 58,593 59,344 57,027 59,157 59,846 58,115 59,157
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2### 81,323 82,526 78,817 82,225 83,328 80,559 82,225
13.9 MANTO FIBERGLASS 600X1 M2### 30,608 30,608 30,608 30,608 30,608 30,608 30,608
13.10 PEGANTE MORTERO-CONCRETO M2### 23,197 23,197 23,197 23,197 23,197 23,197 23,197
13.11 PERMA PLY 2 CAPAS M2### 27,242 27,242 27,242 27,242 27,242 27,242 27,242
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2### 47,726 48,403 46,317 48,234 48,854 47,297 48,234
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2### 55,936 56,763 54,213 56,556 57,314 55,411 56,556
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2### 81,112 82,390 78,450 82,070 83,242 80,300 82,070
13.15 TRITURADO FINO 1/2 M3### 133,660 144,413 111,257 141,725 151,582 111,257 141,725
13.16 TRITURADO GRUESO 3/4 M3### 140,465 151,643 115,355 146,560 159,757 125,305 149,346
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2### 57,525 57,525 57,525 57,525 57,525 57,427 57,525
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,434 34,434 34,434 34,434 34,434 34,385 34,434
14.3 ADOQUÍN CONCRETO 6CM M2### 65,441 65,441 65,441 65,441 65,441 65,197 65,441
14.4 ADOQUÍN CONCRETO 8CM M2### 68,791 68,791 68,791 68,791 68,791 68,547 68,791
14.5 ADOQUÍN GRES PEATONAL M2### 73,077 73,077 73,077 73,077 73,077 72,833 73,077
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO M2### 75,852 75,852 75,852 75,852 75,852 75,754 75,852
14.7 GRAVILLA PARA GRADAS ML ### 37,876 37,980 37,658 37,954 38,050 37,609 37,954
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2### 164,500 164,500 164,500 164,500 164,500 164,061 164,500
14.9 ACABADO EN GRAVILLA LAVADA M2### 47,279 47,488 46,844 47,436 47,627 46,698 47,436
14.10 GUARDAESCOBA EN GRANITO ML ### 44,378 44,378 44,378 44,378 44,378 44,378 44,378
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,542 10,647 10,325 10,620 10,716 10,276 10,620
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,474 9,474 9,474 9,474 9,474 9,474 9,474
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,713 12,713 12,713 12,713 12,713 12,713 12,713
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
14.14 GUARDAESCOBA PINO CARIBE ML ### p 10,653 10,653 10,653 10,653 10,653 10,653 10,653
14.15 GUARDAESCOBA CEDRO BLANCO ML ### i 17,812 17,812 17,812 17,812 17,812 17,812 17,812
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### o 34,656 34,656 34,656 34,656 34,656 34,656 34,656
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,353 9,353 9,353 9,353 9,353 9,353 9,353
14.18 LISTÓN M.H. AMARILLO M2### 75,243 75,243 75,243 75,243 75,243 75,243 75,243
14.19 PASO ESCALERA GRANITO ML ### 119,121 119,121 119,121 119,121 119,121 118,779 119,121
14.20 PIRLANES ALUMINIO ML ### 7,655 7,655 7,655 7,655 7,655 7,655 7,655
14.21 PIRLANES LADRILLO ML ### 32,283 32,283 32,283 32,283 32,283 32,146 32,283
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2### 46,380 46,380 46,380 46,380 46,380 46,380 46,380
14.23 PISO VINILO TRÁFICO PESADO M2### 53,878 53,878 53,878 53,878 53,878 53,878 53,878
14.24 PULIDA LACADA PISO MADERA M2### 49,779 49,779 49,779 49,779 49,779 49,779 49,779
14.25 TABLETA DE GRES 25X25 M2### 49,882 49,882 49,882 49,882 49,882 49,785 49,882
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2### 55,996 55,996 55,996 55,996 55,996 55,899 55,996
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,094 11,094 11,094 11,094 11,094 11,094 11,094
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2### 49,905 49,905 49,905 49,905 49,905 49,699 49,905
14.29 JABONERA PORCELANA ACUARIO UN ### 20,842 20,842 20,842 20,842 20,842 20,842 20,842
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 124,640 124,640 124,640 124,640 124,640 124,640 124,640
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,087 10,087 10,087 10,087 10,087 10,087 10,087
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,763 22,763 22,763 22,763 22,763 22,763 22,763
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,632 14,632 14,632 14,632 14,632 14,632 14,632
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,217 14,217 14,217 14,217 14,217 14,217 14,217
14.35 REMATES BOCEL ALUMINIO ML ### 8,674 8,674 8,674 8,674 8,674 8,674 8,674
14.36 REMATES BOCEL PORCELANA ML ### 8,825 8,825 8,825 8,825 8,825 8,825 8,825
14.37 TAPA REGISTRO 20X20 UN ### 19,296 19,296 19,296 19,296 19,296 19,296 19,296
14.38 TAPA REGISTRO 6X6 UN ### 17,592 17,592 17,592 17,592 17,592 17,592 17,592
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL
14.39 N.5 M2### 18,850 18,850 18,850 18,850 18,850 18,850 18,850
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO M2### 21,791 21,791 21,791 21,791 21,791 21,791 21,791
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2### 65,730 65,730 65,730 65,730 65,730 65,632 65,730
14.42 MEDIA CAÑA EN GRANITO ML ### 78,247 78,247 78,247 78,247 78,247 78,247 78,247
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2### 34,639 34,639 34,639 34,639 34,639 34,639 34,639
14.44 PINTURA ACRÍLICA PARA PISOS M2### 13,433 13,433 13,433 13,433 13,433 13,433 13,433
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2### 102,702 102,702 102,702 102,702 102,702 102,702 102,702
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2### p 124,374 124,374 124,374 124,374 124,374 124,374 124,374
i
15 CIELO RASO o
15.1 APLIQUE YESO ML ### 73,527 73,527 73,527 73,527 73,527 73,527 73,527
15.2 ARMADURA MADERA Y MALLA M2### 36,431 36,431 36,431 36,431 36,431 36,431 36,431
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2### 56,103 56,103 56,103 56,103 56,103 56,103 56,103
15.4 CIELO RASO DURACUSTIC M2### 68,792 68,792 68,792 68,792 68,792 68,792 68,792
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2### 51,365 51,365 51,365 51,365 51,365 51,365 51,365
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2### 95,143 95,143 95,143 95,143 95,143 95,143 95,143
15.7 CORNISAS YESO ML ### 49,339 49,339 49,339 49,339 49,339 49,339 49,339
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2### 105,114 105,114 105,114 105,114 105,114 105,114 105,114
15.9 MALLA CON VENA M2### 13,630 13,630 13,630 13,630 13,630 13,630 13,630
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE
16.2 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 43,707 43,707 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3### 49,987 49,987 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3### 85,005 85,005 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3### 114,774 123,341 89,073 111,347 131,908 131,908 123,341
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3### 142,463 153,947 118,538 151,076 161,603 118,538 151,076
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3### 136,640 212,029 119,506 200,035 170,908 170,908 215,456
16.11 AFRIMADO (NORMA INVIAS 311) M3### 104,680 113,247 78,979 101,253 121,814 121,814 130,381
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3### 136,718 186,407 109,953 174,413 153,852 145,285 189,834
16.13 BASE GRANULAR (NORMA INVIAS 330) M3### 133,609 208,998 116,475 197,005 167,877 167,877 212,425
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 304,976 304,976 304,976 304,976 304,976 304,976 304,976
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE p
17.2 GRIFERÍA) UN ### i 898,174 898,174 898,174 898,174 898,174 898,174 898,174
o
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE
17.3 GRIFERÍA) UN ### 486,845 486,845 486,845 486,845 486,845 486,845 486,845
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 404,093 404,093 404,093 404,093 404,093 404,093 404,093
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 293,669 293,669 293,669 293,669 293,669 293,669 293,669
18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2### 8,423 8,423 8,423 8,423 8,423 8,423 8,423
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,120 3,120 3,120 3,120 3,120 3,120 3,120
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2### 11,234 11,234 11,234 11,234 11,234 11,234 11,234
18.4 BARNIZ SOBRE MUEBLES M2### 42,632 42,632 42,632 42,632 42,632 42,632 42,632
18.5 CARBURO SOBRE PAÑETES M2### 5,889 5,889 5,889 5,889 5,889 5,889 5,889
18.6 COLORPLAST FACHADA SOBRE FACHADA M2### 66,249 66,249 66,249 66,249 66,249 66,249 66,249
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,504 3,504 3,504 3,504 3,504 3,504 3,504
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,800 2,800 2,800 2,800 2,800 2,800 2,800
18.9 ESMALTE SOBRE LÁMINA LLENA M2### 14,067 14,067 14,067 14,067 14,067 14,067 14,067
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,073 4,073 4,073 4,073 4,073 4,073 4,073
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
18.11 ESMALTE SOBRE MADERA LLENA M2### p 14,832 14,832 14,832 14,832 14,832 14,832 14,832
18.12 ESMALTE SOBRE MARCOS LÁMINA M2### i 5,794 5,794 5,794 5,794 5,794 5,794 5,794
18.13 ESMALTE SOBRE MARCOS MADERA M2### o 6,595 6,595 6,595 6,595 6,595 6,595 6,595
18.14 ESTUCO M2### 7,085 7,085 7,085 7,085 7,085 7,085 7,085
18.15 ESTUCO (LINEAL) ML ### 4,437 4,437 4,437 4,437 4,437 4,437 4,437
18.16 ESTUCO Y VINILO 3 MANOS M2### 15,660 15,660 15,660 15,660 15,660 15,660 15,660
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,709 9,709 9,709 9,709 9,709 9,709 9,709
18.18 LACA PISOS MADERA M2### 22,974 22,974 22,974 22,974 22,974 22,974 22,974
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,711 2,711 2,711 2,711 2,711 2,711 2,711
18.20 MARMOLINA SOBRE PAÑETE M2### 12,280 12,280 12,280 12,280 12,280 12,280 12,280
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,314 3,314 3,314 3,314 3,314 3,314 3,314
18.22 TINTILLA SOBRE MADERA LLENA M2### 12,710 12,710 12,710 12,710 12,710 12,710 12,710
18.23 VINILO SOBRE PAÑETE 2 MANOS M2### 7,149 7,149 7,149 7,149 7,149 7,149 7,149
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,495 4,495 4,495 4,495 4,495 4,495 4,495
18.25 WASH-PRIMER SOBRE ALUMNIO M2### 21,999 21,999 21,999 21,999 21,999 21,999 21,999
18.26 PINTURA EPÓXICA M2### 12,798 12,798 12,798 12,798 12,798 12,798 12,798
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,908 7,908 7,908 7,908 7,908 7,908 7,908
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,114,048 6,114,048 6,114,048 6,114,048 6,114,048 6,114,048 6,114,048
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,802,582 10,802,582 ### 10,802,582 10,802,582 10,802,582 10,802,582
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,827,095 2,827,095 2,827,095 2,827,095 2,827,095 2,827,095 2,827,095
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,239,024 9,239,024 9,239,024 9,239,024 9,239,024 9,239,024 9,239,024
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,651,858 8,651,858 8,651,858 8,651,858 8,651,858 8,651,858 8,651,858
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,711 2,711 2,711 2,711 2,711 2,711 2,711
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 867,864 867,864 867,864 867,864 867,864 867,864 867,864
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 86,687 86,687 86,687 86,687 86,687 86,687 86,687
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,570,272 1,570,349 1,570,111 1,570,330 1,570,400 1,570,223 1,570,330
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 684,780 686,973 680,213 686,425 688,434 682,330 686,425
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,341 29,341 29,341 29,341 29,341 29,341 29,341
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,270 26,270 26,270 26,270 26,270 26,270 26,270
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,696 27,696 27,696 27,696 27,696 27,696 27,696
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,632 34,632 34,632 34,632 34,632 34,632 34,632
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,782 17,782 17,782 17,782 17,782 17,782 17,782
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,307 23,307 23,307 23,307 23,307 23,307 23,307
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,846 35,846 35,846 35,846 35,846 35,846 35,846
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 274,776 274,776 274,776 274,776 274,776 274,776 274,776
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 316,234 316,234 316,234 316,234 316,234 316,234 316,234
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 329,825 329,825 329,825 329,825 329,825 329,825 329,825
20.16 ACOMETIDA GAS 1/2" ML ### 305,988 305,988 305,988 305,988 305,988 305,988 305,988
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2### 10,824 10,824 10,824 10,824 10,824 10,824 10,824
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2### 24,745 24,745 24,745 24,745 24,745 24,745 24,745
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3### 119,010 129,720 96,698 127,043 136,860 96,698 127,043
2.5 RELLENO TIPO 2 "RECEBO" M3### 109,739 118,306 84,038 106,312 126,873 126,873 118,306
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3### 109,739 118,306 84,038 106,312 126,873 126,873 135,440
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3### 112,431 142,151 112,431 165,723 134,977 143,176 148,300
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3### 62,967 106,846 62,967 106,846 89,085 89,085 94,309
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3### 82,647 82,647 82,647 82,647 82,647 73,703 82,647
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 114,931 114,931 114,931 114,931 114,931 114,931 114,931
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,197,909 1,197,909 1,197,909 1,197,909 1,197,909 1,197,909 1,197,909
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 150,184 150,184 150,184 150,184 150,184 150,184 150,184
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,387,475 1,387,475 1,387,475 1,387,475 1,387,475 1,387,475 1,387,475
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 967,089 967,089 967,089 967,089 967,089 967,089 967,089
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,679 62,679 62,679 62,679 62,679 62,679 62,679
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 114,092 114,092 114,092 114,092 114,092 114,092 114,092
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 269,363 269,363 269,363 269,363 269,363 269,363 269,363
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 269,357 269,357 269,357 269,357 269,357 269,357 269,357
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 432,426 432,426 432,426 432,426 432,426 432,426 432,426
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 114,140 114,140 114,140 114,140 114,140 114,140 114,140
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 114,140 114,140 114,140 114,140 114,140 114,140 114,140
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 269,363 269,363 269,363 269,363 269,363 269,363 269,363
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 269,363 269,363 269,363 269,363 269,363 269,363 269,363
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 432,426 432,426 432,426 432,426 432,426 432,426 432,426
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 434,668 434,668 434,668 434,668 434,668 434,668 434,668
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 705,459 705,459 705,459 705,459 705,459 705,459 705,459
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,132,111 1,132,111 1,132,111 1,132,111 1,132,111 1,132,111 1,132,111
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 69,963 69,963 69,963 69,963 69,963 69,963 69,963
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 363,815 363,815 363,815 363,815 363,815 363,815 363,815
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 407,457 407,457 407,457 407,457 407,457 407,457 407,457
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### p 1,127,989 1,127,989 1,127,989 1,127,989 1,127,989 1,127,989 1,127,989
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### i 65,870 65,870 65,870 65,870 65,870 65,778 65,870
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### o 329,861 329,861 329,861 329,861 329,861 329,861 329,861
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 50,162 50,162 50,162 50,162 50,162 50,162 50,162
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 70,927 70,927 70,927 70,927 70,927 70,927 70,927
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 102,334 102,334 102,334 102,334 102,334 102,334 102,334
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 157,076 157,076 157,076 157,076 157,076 157,076 157,076
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 252,409 252,409 252,409 252,409 252,409 252,409 252,409
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 366,511 366,511 366,511 366,511 366,511 366,511 366,511
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 463,728 463,728 463,728 463,728 463,728 463,728 463,728
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 609,698 609,698 609,698 609,698 609,698 609,698 609,698
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 838,476 838,476 838,476 838,476 838,476 838,476 838,476
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2### 72,708 72,708 72,708 72,708 72,708 72,227 72,708
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2### p 86,228 86,228 86,228 86,228 86,228 85,747 86,228
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2### i 56,631 57,420 54,987 57,223 57,947 56,130 57,223
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2### o 62,093 63,014 60,174 62,783 63,627 61,064 62,783
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2### 61,908 62,741 60,172 62,533 63,296 61,125 62,533
5.6 BORDE SEPARADOR VERDE A-170 ML ### 253,420 253,420 253,420 253,420 253,420 253,293 253,420
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,517 18,612 18,320 18,588 18,675 18,457 18,588
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,522 41,078 39,363 40,939 41,449 40,169 40,939
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 83,249 83,249 83,249 83,249 83,249 83,181 83,249
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 555,877 556,897 553,752 556,642 557,577 552,546 556,642
5.11 LOSETA PREFABRICADA A-40 M2### 61,706 61,706 61,706 61,706 61,706 61,416 61,706
5.12 LOSETA PREFABRICADA A-60 M2### 89,854 89,854 89,854 89,854 89,854 89,564 89,854
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000
5.13 PSI ML ### 33,976 34,344 33,209 34,252 34,590 33,564 34,252
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 54,892 55,637 53,339 55,451 56,134 54,058 55,451
5.15 SARDINEL PREFABRICADO A-10 ML ### 96,691 105,447 94,701 104,054 100,671 100,603 105,845
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2### 59,723 59,723 59,723 59,723 59,723 59,547 59,723
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 203,622 204,061 202,709 203,951 204,353 203,132 203,951
6.2 BANCA EN CONCRETO M-30 UN ### 667,040 667,654 665,761 667,501 668,063 666,354 667,501
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 214,806 214,893 214,623 214,872 214,952 214,718 214,872
6.4 BOLARDO M-60 CONCRETO UN ### 162,777 163,303 161,681 163,172 163,654 162,189 163,172
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 164,645 165,171 163,548 165,039 165,522 164,057 165,039
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 192,739 193,265 191,642 193,133 193,616 192,214 193,133
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 58,317 58,317 58,317 58,317 58,317 57,949 58,317
6.8 BORDILLO PREFABRICADO A-80 ML ### 67,388 67,388 67,388 67,388 67,388 66,976 67,388
6.9 CANECA M-120 UN ### 311,393 311,393 311,393 311,393 311,393 311,300 311,393
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 822,041 822,304 821,493 822,239 822,480 821,747 822,239
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,370,534 3,370,709 3,370,168 3,370,665 3,370,826 3,370,338 3,370,665
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,467,301 3,467,476 3,466,935 3,467,432 3,467,593 3,467,105 3,467,432
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 485,046 485,222 484,681 485,178 485,339 484,871 485,178
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 643,259 643,961 641,798 643,785 644,429 642,560 643,785
6.15 BANCA EN MADERA M-50 UN ### 533,529 533,529 533,529 533,529 533,529 533,529 533,529
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 248,045 248,308 247,497 248,242 248,483 247,751 248,242
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 573,910 573,910 573,910 573,910 573,910 573,680 573,910
6.18 POSTE HISTÓRICO M-131 UN ### 6,408,740 6,410,055 6,405,999 6,409,727 6,410,932 6,407,270 6,409,727
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
p
7 SEÑALIZACIÓN i
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### o 4,027 4,027 4,027 4,027 4,027 4,027 4,027
7.2 MARCA VIAL CON PINTURA EN FRÍO M2### 43,293 43,293 43,293 43,293 43,293 43,293 43,293
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 312,745 312,745 312,745 312,745 312,745 312,682 312,745
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 493,650 494,001 492,920 493,913 494,235 493,301 493,913
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 234,244 234,244 234,244 234,244 234,244 234,180 234,244
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 248,763 248,763 248,763 248,763 248,763 248,699 248,763
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 259,757 259,757 259,757 259,757 259,757 259,693 259,757
7.8 TACHAS REFLECTIVAS UN ### 13,527 13,527 13,527 13,527 13,527 13,527 13,527
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,445 14,445 14,445 14,445 14,445 14,445 14,445
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 117,487 117,487 117,487 117,487 117,487 117,487 117,487
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO
1.1 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3### 35,314 35,314 35,314 35,314 35,314 35,314 35,314
2.4 220.1 TERRAPLENES M3### 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3### 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3### 7,499 7,499 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXIST M2### 481 481 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3### 12,832 12,832 12,832 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3### 20,948 20,948 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 64,959 64,959 64,959 64,959 64,959 64,959 64,959
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 79,733 79,733 79,733 79,733 79,733 79,733 79,733
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO
2.12 600.4 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 19,035 19,035 19,035 19,035 19,035 19,035 19,035
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO
i
2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 M3### p 39,738 39,738 39,738 39,738 39,738 39,738 39,738
KM) i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE o
2.14 600.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 31,203 31,203 31,203 31,203 31,203 31,203 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO
2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 M3### 53,644 53,644 53,644 53,644 53,644 53,644 53,644
KM)
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2### 65,153 65,241 64,970 65,219 65,299 64,699 65,219
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO) M3### 601,169 599,522 579,752 602,817 642,357 624,234 665,422
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3.10 450.2 P ASFÁLTICO) M3### 607,119 605,472 585,702 608,767 648,307 630,184 671,372
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3.11 450.9 P ASFÁLTICO)
M3### 644,828 643,180 623,410 646,475 686,015 667,893 709,080
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3.12 450.3 P ASFÁLTICO) M3### 636,869 635,222 615,452 638,517 678,057 659,934 701,122
3,12(1) P MEZCLA ASFALTICA NATURAL M3### 346,849 323,650 332,157 339,451 350,412 361,654 312,781
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3### 296,856 372,245 279,722 360,251 331,124 331,124 375,672
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3### 298,302 347,991 271,536 335,997 315,436 306,869 351,417
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3### 38,332 38,332 38,332 38,332 38,332 38,332 38,332
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3### 170,051 170,051 170,051 170,051 170,051 170,051 170,051
3.15 311.1 AFIRMADO M3### 104,680 113,247 78,979 101,253 121,814 121,814 130,381
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2### 12,588 12,792 12,163 12,741 12,928 12,163 12,741
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2### 5,133 5,235 4,921 5,210 5,303 4,921 5,210
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3### 640,121 647,115 625,548 645,367 651,779 635,678 645,367
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE
3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3### 672,359 679,667 657,134 677,840 684,539 667,718 677,840
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
M3### p 693,224
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE
3.20 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN 700,637 677,782 698,784 705,578 688,820 698,784
i
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE o
3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,035 7,035 7,035 7,035 7,035 7,035 7,035
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3### 94,759 155,650 94,759 155,650 131,004 131,004 138,253
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2### 14,359 14,359 14,359 14,359 14,359 14,359 14,359
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2### 19,313 19,313 19,313 19,313 19,313 19,313 19,313
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2### 23,145 23,145 23,145 23,145 23,145 23,145 23,145
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN)
M2### 29,731 29,731 29,731 29,731 29,731 29,731 29,731
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800
4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 7,234 7,234 7,234 7,234 7,234 7,234 7,234
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3### 172,492 180,729 147,779 169,197 188,967 188,967 197,204
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
CONSTRUCCIÓN
URBANISMO
DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
p CONSTRUCCIÓN
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ### o 2,015,826 2,012,942 2,020,875 2,030,973 2,020,154 2,035,300 2,028,810
1.2 CAMPAMENTO 9 M2 UN ### 1,175,973 1,174,531 1,178,498 1,183,547 1,178,137 1,185,710 1,182,465
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,302 14,302 14,302 14,302 14,302 14,302 14,302
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,035 16,035 16,035 16,035 16,035 16,035 16,035
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,536 18,536 18,536 18,536 18,536 18,536 18,536
1.6 CERCA EN TABLA H=2.30 M ML ### 66,935 66,935 66,935 66,935 66,935 66,935 66,935
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,805 46,773 46,860 46,970 46,852 47,017 46,946
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,545 21,514 21,600 21,710 21,592 21,757 21,687
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2### 10,480 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2### i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2###
i 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 919,089 918,178 919,440 921,733 920,058 922,702 921,796
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS
1.41 DE PRESICIÓN M2### 10,595 10,595 10,595 10,595 10,595 10,595 10,595
1.42 REPLANTEO MANUAL DE CIMIENTOS M2### 3,827 3,827 3,827 3,827 3,827 3,827 3,827
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,742,727 2,742,727 2,742,727 2,742,727 2,742,727 2,742,727 2,742,727
1.44 RED TELEFÓNICA PROVISIONAL UN ### 253,285 253,285 253,285 253,285 253,285 253,285 253,285
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE) M3### 9,189 9,189 9,189 9,189 9,189 9,189 9,189
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3### 90,126 79,845 86,699 107,260 98,693 115,827 112,400
2.2 BASE ARENA CEMENTO 1:20 M3### 204,156 200,715 210,177 222,220 209,317 227,380 219,639
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2### 22,581 22,581 22,581 22,581 22,581 22,581 22,581
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3### 629,386 626,304 634,779 645,565 634,008 650,187 643,254
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3### 630,538 627,341 636,133 647,324 635,334 652,118 644,925
2.8 ZAPATAS EN CONCRETO 3500 PSI M3### 586,842 583,848 592,081 602,559 591,332 607,048 600,313
2.9 PILOTE DE MADERA D=20 CM ML ### 49,907 49,907 49,907 49,907 49,907 49,907 49,907
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE
2.10 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 153,950 153,950 153,950 153,950 153,950 153,950 153,950
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE
2.11 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 192,736 192,736 192,736 192,736 192,736 192,736 192,736
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE
2.12 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 239,639 239,639 239,639 239,639 239,639 239,639 239,639
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE
2.13 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 302,778 302,778 302,778 302,778 302,778 302,778 302,778
2.14 PILOTE HINCADO 25X25 ML ### 104,524 104,306 104,906 105,670 104,851 105,997 105,506
2.15 PILOTE HINCADO 30X30 ML ### 128,905 128,589 129,459 130,566 129,380 131,040 130,329
2.16 DADOS EN CONCRETO 3500PSI M3### 572,692 569,699 577,932 588,410 577,183 592,899 586,164
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM)
ML ### 92,160 92,160 92,160 92,160 92,160 92,160 92,160
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2### 43,044 43,044 43,044 43,044 43,044 43,044 43,044
4.2 CASETÓN DE LONA 0.80X0.70 M2### 56,883 56,883 56,883 56,883 56,883 56,883 56,883
4.3 COLUMNAS 3500 PSI M3### 795,354 792,361 800,594 811,072 799,845 815,561 808,825
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3### 237,939 239,423 244,118 259,819 248,668 255,085 247,559
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4.5 MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2### 98,199 97,908 98,707 99,725 98,635 100,160 99,506
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.
4.6 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2### 115,816 115,468 116,427 117,648 116,340 118,170 117,386
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO)
M2### 128,041 127,576 128,855 130,483 128,739 131,180 130,134
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2### 275,409 274,072 277,749 282,428 277,414 284,433 281,425
4.21 ACERO FIGURADO 37000 PSI KG ### 4,280 4,280 4,280 4,280 4,280 4,280 4,280
4.22 ACERO FIGURADO 60000 PSI KG ### 4,489 4,489 4,489 4,489 4,489 4,489 4,489
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,266 6,266 6,266 6,266 6,266 6,266 6,266
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3### 840,773 837,780 846,013 856,491 845,264 860,980 854,245
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3### 762,744 759,468 768,478 779,946 767,659 784,859 777,488
4.26 VIGA AÉREA 3500 PSI M3### 835,019 832,026 840,259 850,737 839,510 855,226 848,491
4.27 VIGA CINTA 3500 PSI M3### 814,950 811,957 820,190 830,668 819,441 835,157 828,422
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3### 1,025,682 1,022,689 1,030,921 1,041,400 1,030,173 1,045,888 1,039,153
4.29 BASE EN CONCRETO POBRE 1500 PSI M3### 302,994 299,693 308,772 320,329 307,947 325,281 317,853
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,554 29,471 29,699 29,989 29,679 30,114 29,927
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,966 49,883 50,111 50,401 50,090 50,526 50,339
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,491 35,469 35,528 35,603 35,523 35,635 35,587
5.4 ARCOS EN LADRILLO PRENSADO ML ### 166,081 166,038 166,156 166,306 166,145 166,370 166,273
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,997 43,905 44,158 44,482 44,135 44,620 44,412
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,288 27,245 27,363 27,513 27,352 27,577 27,481
5.7 ENCHAPES LADRILLO PRENSADO M2### 101,342 101,256 101,491 101,791 101,470 101,919 101,726
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2### 90,290 89,982 90,828 91,905 90,751 92,367 91,675
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2### 93,030 93,030 93,030 93,030 93,030 93,030 93,030
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 54,438 54,438 54,438 54,438 54,438 54,438 54,438
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2### 89,564 89,564 89,564 89,564 89,564 89,564 89,564
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,705 52,705 52,705 52,705 52,705 52,705 52,705
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2### i 104,051 104,051 104,051 104,051 104,051 104,051 104,051
p
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ###
i 61,271 61,271 61,271 61,271 61,271 61,271 61,271
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2### o 115,812 115,812 115,812 115,812 115,812 115,812 115,812
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 67,151 67,151 67,151 67,151 67,151 67,151 67,151
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2### 41,488 41,445 41,563 41,713 41,552 41,778 41,681
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,058 25,036 25,095 25,170 25,090 25,203 25,154
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2### 54,173 54,144 54,223 54,323 54,216 54,366 54,302
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,466 32,452 32,491 32,541 32,487 32,562 32,530
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2### 60,922 60,893 60,972 61,072 60,965 61,115 61,051
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,514 36,499 36,539 36,589 36,535 36,610 36,578
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2### 101,316 101,172 101,566 102,067 101,530 102,282 101,960
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 59,737 59,665 59,862 60,113 59,844 60,220 60,059
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2### 38,010 37,981 38,060 38,160 38,053 38,203 38,139
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,986 22,971 23,011 23,061 23,007 23,082 23,050
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2### 75,703 75,646 75,803 76,004 75,789 76,090 75,961
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,513 45,484 45,563 45,663 45,556 45,706 45,642
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2### 89,763 89,721 89,838 89,988 89,827 90,052 89,956
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 54,220 54,199 54,258 54,332 54,252 54,364 54,316
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2### 186,219 186,018 186,569 187,271 186,519 187,572 187,121
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 111,503 111,403 111,679 112,030 111,654 112,180 111,954
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2### 91,475 91,392 91,622 91,916 91,601 92,042 91,853
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 55,076 55,034 55,150 55,296 55,139 55,359 55,265
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2### 47,877 47,813 47,989 48,214 47,973 48,310 48,166
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,037 29,005 29,093 29,205 29,085 29,254 29,181
5.37 MURO TOLETE COMÚN 0.06 M M2### 34,422 34,393 34,472 34,572 34,465 34,615 34,551
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,917 20,902 20,942 20,992 20,938 21,013 20,981
5.39 MURO TOLETE COMÚN 0.12 M M2### 52,168 52,111 52,268 52,469 52,254 52,555 52,426
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,865 31,836 31,915 32,015 31,908 32,058 31,994
5.41 MURO TOLETE COMÚN 0.25 M M2### 100,686 100,600 100,836 101,137 100,815 101,266 101,073
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 61,091 61,048 61,166 61,317 61,156 61,381 61,285
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2### 73,454 73,397 73,554 73,755 73,540 73,841 73,712
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
5.44 (LINEAL) ML ### 44,226 44,198 44,277 44,377 44,269 44,420 44,355
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2### 154,634 154,434 154,985 155,687 154,935 155,987 155,537
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA
5.46 (LINEAL) ML ### 93,734 93,634 93,910 94,260 93,885 94,411 94,185
5.47 REMATES LADRILLO PRENSADO ML ### 32,329 32,308 32,366 32,441 32,361 32,473 32,425
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,882 36,822 36,988 37,199 36,973 37,289 37,154
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### i 62,349 62,269 62,490 62,772 62,470 62,893 62,712
p
5.50 LAVADA DE FACHADA M2###
i 5,264 5,264 5,264 5,264 5,264 5,264 5,264
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### o 50,331 50,248 50,476 50,767 50,456 50,891 50,704
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,637 10,637 10,637 10,637 10,637 10,637 10,637
5.53 ANCLAJE 3/8" L=30CM UN ### 14,076 14,076 14,076 14,076 14,076 14,076 14,076
5.54 ANCLAJE 1/2" L=50CM UN ### 18,400 18,400 18,400 18,400 18,400 18,400 18,400
5.55 ANCLAJE 5/8" L=70CM UN ### 25,792 25,792 25,792 25,792 25,792 25,792 25,792
5.56 ANCLAJE 3/4" L=70CM UN ### 38,506 38,506 38,506 38,506 38,506 38,506 38,506
5.57 ANCLAJE 1" L= 70CM UN ### 4,824 4,802 4,864 4,942 4,858 4,975 4,925
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3### 439,552 436,389 445,087 456,157 444,297 460,901 453,785
8.2 CONCRETO 3500 PSI M3### 382,801 379,895 387,888 398,061 387,161 402,419 395,880
8.3 CONCRETO 3000 PSI M3### 380,051 377,059 385,287 395,759 384,539 400,246 393,515
8.4 CONCRETO 2500 PSI M3### 334,638 331,561 340,024 350,795 339,255 355,410 348,487
8.5 CONCRETO 2000 PSI M3### 310,123 306,982 315,621 326,617 314,836 331,328 324,260
8.6 CONCRETO 1500 PSI M3### 279,058 275,853 284,668 295,888 283,867 300,696 293,484
8.7 MORTERO SECO 1:10 M3### 247,088 244,139 252,249 262,572 251,512 266,995 260,360
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3### 461,865 459,001 466,876 476,900 466,161 481,194 474,752
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3### 414,718 411,920 419,614 429,405 418,914 433,601 427,307
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3### 477,766 475,149 482,345 491,502 481,691 495,427 489,540
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3### 708,866 706,249 713,445 722,602 712,791 726,527 720,640
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 125,649 125,649 125,649 125,649 125,649 125,649 125,649
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,061 4,040 4,098 4,173 4,093 4,205 4,157
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2### 140,544 140,544 140,544 140,544 140,544 140,544 140,544
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2### 172,181 172,181 172,181 172,181 172,181 172,181 172,181
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 250,540 250,540 250,540 250,540 250,540 250,540 250,540
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 278,873 278,873 278,873 278,873 278,873 278,873 278,873
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 307,238 307,238 307,238 307,238 307,238 307,238 307,238
9.8 HOJA PUERTA FORTEC 0.81 UN ### 204,075 204,075 204,075 204,075 204,075 204,075 204,075
9.9 HOJA PUERTA FORTEC 0.91 UN ### 231,367 231,367 231,367 231,367 231,367 231,367 231,367
9.10 HOJA PUERTA FORTEC 1.50 UN ### 340,534 340,534 340,534 340,534 340,534 340,534 340,534
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 129,022 129,022 129,022 129,022 129,022 129,022 129,022
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### i 171,325 171,325 171,325 171,325 171,325 171,325 171,325
p
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ###
i 190,429 190,429 190,429 190,429 190,429 190,429 190,429
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### o 485,181 485,181 485,181 485,181 485,181 485,181 485,181
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,913 42,913 42,913 42,913 42,913 42,913 42,913
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,691 26,691 26,691 26,691 26,691 26,691 26,691
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2### 101,445 101,445 101,445 101,445 101,445 101,445 101,445
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 124,092 124,092 124,092 124,092 124,092 124,092 124,092
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 96,391 96,391 96,391 96,391 96,391 96,391 96,391
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,854 29,854 29,854 29,854 29,854 29,854 29,854
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,854 29,854 29,854 29,854 29,854 29,854 29,854
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,298 28,298 28,298 28,298 28,298 28,298 28,298
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2### 43,267 43,267 43,267 43,267 43,267 43,267 43,267
9.24 ESPEJO BISELADO INCOLORO 4 MM M2### 53,604 53,604 53,604 53,604 53,604 53,604 53,604
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2### 64,629 64,629 64,629 64,629 64,629 64,629 64,629
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2### 77,723 77,723 77,723 77,723 77,723 77,723 77,723
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2### 366,349 366,349 366,349 366,349 366,349 366,349 366,349
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2### 256,091 256,091 256,091 256,091 256,091 256,091 256,091
9.29 VIDRIO TRANSPARENTE 3 MM M2### 34,308 34,308 34,308 34,308 34,308 34,308 34,308
9.30 VIDRIO TRANSPARENTE 4 MM M2### 43,957 43,957 43,957 43,957 43,957 43,957 43,957
9.31 VIDRIO TRANSPARENTE 5 MM M2### 53,604 53,604 53,604 53,604 53,604 53,604 53,604
9.32 VIDRIO TRANSPARENTE 6 MM M2### 67,387 67,387 67,387 67,387 67,387 67,387 67,387
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 77,590 77,590 77,590 77,590 77,590 77,590 77,590
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2### 216,184 216,184 216,184 216,184 216,184 216,184 216,184
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO
10.3 DE 1" (INCLUYE ANTICORROSIVO) ML ### 82,095 82,095 82,095 82,095 82,095 82,095 82,095
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 146,741 146,741 146,741 146,741 146,741 146,741 146,741
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 139,213 139,213 139,213 139,213 139,213 139,213 139,213
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2### 91,397 91,397 91,397 91,397 91,397 91,397 91,397
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 215,497 215,497 215,497 215,497 215,497 215,497 215,497
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 112,199 112,199 112,199 112,199 112,199 112,199 112,199
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,728 6,728 6,728 6,728 6,728 6,728 6,728
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL
10.10 EN TUBO ESTRUCTURAL GALVANIZADO 2") M2### 101,145 101,145 101,145 101,145 101,145 101,145 101,145
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA
10,10(1) CLASICA) H: 2.00 MTS M2### 123,463 123,463 123,463 123,463 123,463 123,463 123,463
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC.
i
10.11 ANTICORROSIVO ML ### p 41,651 41,651 41,651 41,651 41,651 41,651 41,651
i
M2### o
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10.12 E=6MM 551,380 551,380 551,380 551,380 551,380 551,380 551,380
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2### 198,180 198,180 198,180 198,180 198,180 198,180 198,180
11.59 GABINETE TIPO III UN ### 1,037,892 1,037,892 1,037,892 1,037,892 1,037,892 1,037,892 1,037,892
11.60 GABINETE TIPO I UN ### 792,538 792,538 792,538 792,538 792,538 792,538 792,538
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,668,146 2,668,146 2,668,146 2,668,146 2,668,146 2,668,146 2,668,146
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,224,293 2,224,293 2,224,293 2,224,293 2,224,293 2,224,293 2,224,293
11.63 VÁLVULA MARIPOSA 3" UN ### 644,944 644,944 644,944 644,944 644,944 644,944 644,944
11.64 VÁLVULA MARIPOSA 4" UN ### 834,895 834,895 834,895 834,895 834,895 834,895 834,895
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### i 321,775 321,775 321,775 321,775 321,775 321,775 321,775
p
i
12 INSTALACIONES ELÉCTRICAS o
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 371,509 371,509 371,509 371,509 371,509 371,509 371,509
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,033 59,033 59,033 59,033 59,033 59,033 59,033
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 69,893 69,893 69,893 69,893 69,893 69,893 69,893
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 77,590 77,590 77,590 77,590 77,590 77,590 77,590
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 91,398 91,398 91,398 91,398 91,398 91,398 91,398
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,492 55,492 55,492 55,492 55,492 55,492 55,492
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 63,256 63,256 63,256 63,256 63,256 63,256 63,256
12.8 STRIP TELEFÓNICO 10 PARES UN ### 145,929 145,929 145,929 145,929 145,929 145,929 145,929
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 56,986 56,986 56,986 56,986 56,986 56,986 56,986
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 130,979 130,979 130,979 130,979 130,979 130,979 130,979
12.11 SALIDA T.V PVC COMPLETA. UN ### 78,308 78,308 78,308 78,308 78,308 78,308 78,308
12.12 SALIDA BIFÁSICA C.N. UN ### 46,441 46,441 46,441 46,441 46,441 46,441 46,441
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 97,838 97,838 97,838 97,838 97,838 97,838 97,838
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 417,708 417,708 417,708 417,708 417,708 417,708 417,708
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 556,470 556,470 556,470 556,470 556,470 556,470 556,470
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,604 3,604 3,604 3,604 3,604 3,604 3,604
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,758 4,758 4,758 4,758 4,758 4,758 4,758
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,405 7,405 7,405 7,405 7,405 7,405 7,405
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,242 13,242 13,242 13,242 13,242 13,242 13,242
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 278,288 278,288 278,288 278,288 278,288 278,288 278,288
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 78,601 78,601 78,601 78,601 78,601 78,601 78,601
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 106,463 106,463 106,463 106,463 106,463 106,463 106,463
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 43,351 43,351 43,351 43,351 43,351 43,351 43,351
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,425,766 1,425,766 1,425,766 1,425,766 1,425,766 1,425,766 1,425,766
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,056,563 1,056,563 1,056,563 1,056,563 1,056,563 1,056,563 1,056,563
12.26 POSTE METÁLICO 6M UN ### 1,322,974 1,322,974 1,322,974 1,322,974 1,322,974 1,322,974 1,322,974
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE
12.27 LUMINARIA) UN ### 615,904 615,904 615,904 615,904 615,904 615,904 615,904
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 112,317 112,317 112,317 112,317 112,317 112,317 112,317
12.29 LUMINARIA 70W SODIO UN ### 516,786 516,786 516,786 516,786 516,786 516,786 516,786
12.30 LUMINARIA 150W SODIO UN ### 646,594 646,594 646,594 646,594 646,594 646,594 646,594
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,708,141 1,708,141 1,708,141 1,708,141 1,708,141 1,708,141 1,708,141
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,257,825 1,257,825 1,257,825 1,257,825 1,257,825 1,257,825 1,257,825
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
13 PISOS BASES i
p
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2###
i 40,174 40,073 40,350 40,702 40,324 40,853 40,626
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2### o 39,952 39,851 40,128 40,480 40,103 40,631 40,405
13.3 ALISTADO PARA LISTÓN M2### 14,873 14,853 14,908 14,978 14,903 15,009 14,963
13.4 ALISTADO PISOS 1:3, E=0.04 M2### 27,969 27,768 28,321 29,026 28,271 29,327 28,875
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2### 86,356 86,154 86,708 87,412 86,657 87,714 87,261
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,501 26,438 26,611 26,831 26,595 26,925 26,783
13.7 CONCRETO BASE GRADAS 2500 PSI M2### 56,264 55,956 56,802 57,879 56,725 58,341 57,649
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2### 77,594 77,102 78,456 80,180 78,333 80,918 79,810
13.9 MANTO FIBERGLASS 600X1 M2### 31,067 31,067 31,067 31,067 31,067 31,067 31,067
13.10 PEGANTE MORTERO-CONCRETO M2### 23,436 23,436 23,436 23,436 23,436 23,436 23,436
13.11 PERMA PLY 2 CAPAS M2### 27,488 27,488 27,488 27,488 27,488 27,488 27,488
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2### 45,612 45,335 46,097 47,066 46,027 47,481 46,858
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2### 53,346 53,008 53,939 55,124 53,854 55,631 54,870
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2### 77,120 76,597 78,036 79,867 77,905 80,651 79,475
13.15 TRITURADO FINO 1/2 M3### 83,279 81,077 87,131 94,835 86,581 98,136 93,184
13.16 TRITURADO GRUESO 3/4 M3### 90,103 85,835 92,598 103,957 94,914 108,767 103,740
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2### 58,416 58,376 58,486 58,627 58,476 58,688 58,597
BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA
14.2 (LINEAL) ML ### 34,880 34,860 34,916 34,986 34,911 35,016 34,971
14.3 ADOQUÍN CONCRETO 6CM M2### 66,571 66,470 66,747 67,099 66,722 67,250 67,023
14.4 ADOQUÍN CONCRETO 8CM M2### 69,971 69,870 70,147 70,499 70,122 70,650 70,423
14.5 ADOQUÍN GRES PEATONAL M2### 74,359 74,258 74,535 74,887 74,510 75,038 74,812
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE
14.6 FONDO BLANCO. INCLUYE ALISTADO M2### 77,148 77,107 77,218 77,359 77,208 77,419 77,329
14.7 GRAVILLA PARA GRADAS ML ### 37,500 37,458 37,572 37,718 37,562 37,780 37,687
ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y
14.8 PULIDA)
M2### 167,686 167,505 168,003 168,637 167,958 168,908 168,501
14.9 ACABADO EN GRAVILLA LAVADA M2### 46,626 46,522 46,806 47,167 46,780 47,322 47,090
14.10 GUARDAESCOBA EN GRANITO ML ### 44,719 44,719 44,719 44,719 44,719 44,719 44,719
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,128 10,086 10,200 10,345 10,190 10,408 10,314
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,644 9,644 9,644 9,644 9,644 9,644 9,644
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,950 12,950 12,950 12,950 12,950 12,950 12,950
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,776 10,776 10,776 10,776 10,776 10,776 10,776
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,083 18,083 18,083 18,083 18,083 18,083 18,083
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,277 35,277 35,277 35,277 35,277 35,277 35,277
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### i 9,392 9,392 9,392 9,392 9,392 9,392 9,392
p
14.18 LISTÓN M.H. AMARILLO M2###
i 76,224 76,224 76,224 76,224 76,224 76,224 76,224
14.19 PASO ESCALERA GRANITO ML ### o 120,900 120,759 121,147 121,640 121,112 121,851 121,534
14.20 PIRLANES ALUMINIO ML ### 7,667 7,667 7,667 7,667 7,667 7,667 7,667
14.21 PIRLANES LADRILLO ML ### 32,716 32,673 32,790 32,940 32,780 33,004 32,908
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2### 47,129 47,129 47,129 47,129 47,129 47,129 47,129
14.23 PISO VINILO TRÁFICO PESADO M2### 54,794 54,794 54,794 54,794 54,794 54,794 54,794
14.24 PULIDA LACADA PISO MADERA M2### 50,344 50,344 50,344 50,344 50,344 50,344 50,344
14.25 TABLETA DE GRES 25X25 M2### 50,639 50,599 50,709 50,850 50,699 50,911 50,820
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2### 56,880 56,840 56,950 57,091 56,940 57,152 57,061
GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO
14.27 BLANCO ML ### 11,169 11,169 11,169 11,169 11,169 11,169 11,169
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2### 50,818 50,754 50,930 51,154 50,914 51,251 51,106
14.29 JABONERA PORCELANA ACUARIO UN ### 21,164 21,164 21,164 21,164 21,164 21,164 21,164
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 126,743 126,743 126,743 126,743 126,743 126,743 126,743
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,150 10,150 10,150 10,150 10,150 10,150 10,150
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,090 23,090 23,090 23,090 23,090 23,090 23,090
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,790 14,790 14,790 14,790 14,790 14,790 14,790
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,367 14,367 14,367 14,367 14,367 14,367 14,367
14.35 REMATES BOCEL ALUMINIO ML ### 8,715 8,715 8,715 8,715 8,715 8,715 8,715
14.36 REMATES BOCEL PORCELANA ML ### 8,869 8,869 8,869 8,869 8,869 8,869 8,869
14.37 TAPA REGISTRO 20X20 UN ### 19,552 19,552 19,552 19,552 19,552 19,552 19,552
14.38 TAPA REGISTRO 6X6 UN ### 17,812 17,812 17,812 17,812 17,812 17,812 17,812
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE
14.39 MÁRMOL N.5 M2### 19,241 19,241 19,241 19,241 19,241 19,241 19,241
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2### 66,879 66,839 66,950 67,090 66,940 67,151 67,060
14.42 MEDIA CAÑA EN GRANITO ML ### 79,715 79,715 79,715 79,715 79,715 79,715 79,715
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2### 34,712 34,712 34,712 34,712 34,712 34,712 34,712
14.44 PINTURA ACRÍLICA PARA PISOS M2### 13,599 13,599 13,599 13,599 13,599 13,599 13,599
PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS
14.45 DEPORTIVOS
M2### 104,785 104,785 104,785 104,785 104,785 104,785 104,785
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2### 126,762 126,762 126,762 126,762 126,762 126,762 126,762
15 CIELO RASO
15.1 APLIQUE YESO ML ### 74,886 74,886 74,886 74,886 74,886 74,886 74,886
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
15.2 ARMADURA MADERA Y MALLA M2### i 36,654 36,654 36,654 36,654 36,654 36,654 36,654
p
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2###
i 56,796 56,796 56,796 56,796 56,796 56,796 56,796
15.4 CIELO RASO DURACUSTIC M2### o 69,748 69,748 69,748 69,748 69,748 69,748 69,748
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2### 52,037 52,037 52,037 52,037 52,037 52,037 52,037
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2### 96,587 96,587 96,587 96,587 96,587 96,587 96,587
15.7 CORNISAS YESO ML ### 50,279 50,279 50,279 50,279 50,279 50,279 50,279
LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE
15.8 APOYO) M2### 106,812 106,812 106,812 106,812 106,812 106,812 106,812
15.9 MALLA CON VENA M2### 13,720 13,720 13,720 13,720 13,720 13,720 13,720
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE
16.2 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M
16.4 (INCLUYE M3### 43,707 43,707 43,707 43,707 43,707 43,707 43,707
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M
16.5 (INCLUYE M3### 49,987 49,987 49,987 49,987 49,987 49,987 49,987
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN
16.6 EXPLOSIVOS) M3### 85,005 85,005 85,005 85,005 85,005 85,005 85,005
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3### 84,692 74,411 81,265 101,826 93,259 110,393 106,966
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3### 88,657 86,306 92,771 100,999 92,184 104,525 99,236
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3### 110,679 124,386 122,672 160,367 143,233 129,526 115,819
16.11 AFRIMADO (NORMA INVIAS 311) M3### 80,032 69,751 76,605 97,166 88,599 105,733 102,306
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3### 105,151 118,858 117,144 154,839 137,705 123,998 110,291
16.13 BASE GRANULAR (NORMA INVIAS 330) M3### 107,648 121,355 119,642 157,336 140,202 126,495 112,788
17 APARATOS SANITARIOS
SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE
17.1 GRIFERÍA) UN ### 310,409 310,409 310,409 310,409 310,409 310,409 310,409
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 UN ### p 915,816 915,816 915,816 915,816 915,816 915,816 915,816
GRIFERÍA) i
o
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE
17.3 GRIFERÍA) UN ### 496,051 496,051 496,051 496,051 496,051 496,051 496,051
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 83,944 83,944 83,944 83,944 83,944 83,944 83,944
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN
17.12 ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y UN ### 256,291 256,291 256,291 256,291 256,291 256,291 256,291
GRIFERÍA)
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN
17.13 ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y UN ### 377,740 377,740 377,740 377,740 377,740 377,740 377,740
GRIFERÍA)
18 PINTURAS
IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O
18.1 SIMILAR
M2### 8,501 8,501 8,501 8,501 8,501 8,501 8,501
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,156 3,156 3,156 3,156 3,156 3,156 3,156
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2### 11,303 11,303 11,303 11,303 11,303 11,303 11,303
18.4 BARNIZ SOBRE MUEBLES M2### 43,113 43,113 43,113 43,113 43,113 43,113 43,113
18.5 CARBURO SOBRE PAÑETES M2### 5,927 5,927 5,927 5,927 5,927 5,927 5,927
18.6 COLORPLAST FACHADA SOBRE FACHADA M2### 67,512 67,512 67,512 67,512 67,512 67,512 67,512
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,521 3,521 3,521 3,521 3,521 3,521 3,521
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### i 2,830 2,830 2,830 2,830 2,830 2,830 2,830
p
18.9 ESMALTE SOBRE LÁMINA LLENA M2###
i 14,188 14,188 14,188 14,188 14,188 14,188 14,188
18.10 ESMALTE SOBRE MADERA LINEAL ML ### o 4,113 4,113 4,113 4,113 4,113 4,113 4,113
18.11 ESMALTE SOBRE MADERA LLENA M2### 14,962 14,962 14,962 14,962 14,962 14,962 14,962
18.12 ESMALTE SOBRE MARCOS LÁMINA M2### 5,877 5,877 5,877 5,877 5,877 5,877 5,877
18.13 ESMALTE SOBRE MARCOS MADERA M2### 6,683 6,683 6,683 6,683 6,683 6,683 6,683
18.14 ESTUCO M2### 7,120 7,120 7,120 7,120 7,120 7,120 7,120
18.15 ESTUCO (LINEAL) ML ### 4,455 4,455 4,455 4,455 4,455 4,455 4,455
18.16 ESTUCO Y VINILO 3 MANOS M2### 15,785 15,785 15,785 15,785 15,785 15,785 15,785
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,771 9,771 9,771 9,771 9,771 9,771 9,771
18.18 LACA PISOS MADERA M2### 23,095 23,095 23,095 23,095 23,095 23,095 23,095
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,730 2,730 2,730 2,730 2,730 2,730 2,730
18.20 MARMOLINA SOBRE PAÑETE M2### 12,446 12,446 12,446 12,446 12,446 12,446 12,446
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,356 3,356 3,356 3,356 3,356 3,356 3,356
18.22 TINTILLA SOBRE MADERA LLENA M2### 12,825 12,825 12,825 12,825 12,825 12,825 12,825
18.23 VINILO SOBRE PAÑETE 2 MANOS M2### 7,208 7,208 7,208 7,208 7,208 7,208 7,208
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,524 4,524 4,524 4,524 4,524 4,524 4,524
18.25 WASH-PRIMER SOBRE ALUMNIO M2### 22,278 22,278 22,278 22,278 22,278 22,278 22,278
18.26 PINTURA EPÓXICA M2### 12,885 12,885 12,885 12,885 12,885 12,885 12,885
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,952 7,952 7,952 7,952 7,952 7,952 7,952
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,239,534 6,239,534 6,239,534 6,239,534 6,239,534 6,239,534 6,239,534
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 11,024,273 11,024,273 ### 11,024,273 11,024,273 11,024,273 ###
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,885,012 2,885,012 2,885,012 2,885,012 2,885,012 2,885,012 2,885,012
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO
19.4 (PAR) UN ### 9,428,536 9,428,536 9,428,536 9,428,536 9,428,536 9,428,536 9,428,536
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,829,854 8,829,854 8,829,854 8,829,854 8,829,854 8,829,854 8,829,854
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,730 2,730 2,730 2,730 2,730 2,730 2,730
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 885,107 885,107 885,107 885,107 885,107 885,107 885,107
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 88,486 88,486 88,486 88,486 88,486 88,486 88,486
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,602,016 1,601,984 1,602,071 1,602,182 1,602,064 1,602,230 1,602,158
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 686,935 686,187 688,244 690,862 688,057 691,984 690,301
21.18 BANDEJA PORTACABLES PARA RACK UN ### 107,581 107,581 107,581 107,581 107,581 107,581 107,581
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
21.19 RACK 2' X 24" UN ### i 187,324 187,324 187,324 187,324 187,324 187,324 187,324
p
21.20 RACK 3' X 24" UN ###
i 295,127 295,127 295,127 295,127 295,127 295,127 295,127
21.21 RACK 5' X 24" UN ### o 366,272 366,272 366,272 366,272 366,272 366,272 366,272
21.22 RACK 7' X 24" UN ### 400,387 400,387 400,387 400,387 400,387 400,387 400,387
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 585,307 585,307 585,307 585,307 585,307 585,307 585,307
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 344,490 344,490 344,490 344,490 344,490 344,490 344,490
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y
21.25 MARCACIÓN) UN ### 106,773 106,773 106,773 106,773 106,773 106,773 106,773
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,237 14,237 14,237 14,237 14,237 14,237 14,237
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,111 29,111 29,111 29,111 29,111 29,111 29,111
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,111 5,111 5,111 5,111 5,111 5,111 5,111
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,960 35,960 35,960 35,960 35,960 35,960 35,960
21.30 CANALETA METÁLICA 4X10 CMS ML ### 37,587 37,587 37,587 37,587 37,587 37,587 37,587
21.31 CANALETA METÁLICA 6X10 CMS ML ### 38,398 38,398 38,398 38,398 38,398 38,398 38,398
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,044 25,044 25,044 25,044 25,044 25,044 25,044
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,719 27,719 27,719 27,719 27,719 27,719 27,719
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,842 28,842 28,842 28,842 28,842 28,842 28,842
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 48,596 48,596 48,596 48,596 48,596 48,596 48,596
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 629,452 629,452 629,452 629,452 629,452 629,452 629,452
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 323,007 323,007 323,007 323,007 323,007 323,007 323,007
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 90,251 90,251 90,251 90,251 90,251 90,251 90,251
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,875 1,875 1,875 1,875 1,875 1,875 1,875
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,660 8,660 8,660 8,660 8,660 8,660 8,660
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,937 12,937 12,937 12,937 12,937 12,937 12,937
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,609 21,609 21,609 21,609 21,609 21,609 21,609
21.43 CABLE TELEVISIÓN RG6 ML ### 3,997 3,997 3,997 3,997 3,997 3,997 3,997
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,634 22,634 22,634 22,634 22,634 22,634 22,634
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,986 32,986 32,986 32,986 32,986 32,986 32,986
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,711 19,711 19,711 19,711 19,711 19,711 19,711
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN) ML ### 15,712 15,712 15,712 15,712 15,712 15,712 15,712
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 636,021 636,021 636,021 636,021 636,021 636,021 636,021
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### o 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 93,087 93,087 93,087 93,087 93,087 93,087 93,087
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 524,463 524,463 524,463 524,463 524,463 524,463 524,463
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,119,424 1,119,424 1,119,424 1,119,424 1,119,424 1,119,424 1,119,424
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 128,297 128,297 128,297 128,297 128,297 128,297 128,297
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 781,748 781,748 781,748 781,748 781,748 781,748 781,748
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,682,523 1,682,523 1,682,523 1,682,523 1,682,523 1,682,523 1,682,523
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,376 13,376 13,376 13,376 13,376 13,376 13,376
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,510 16,510 16,510 16,510 16,510 16,510 16,510
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,745 20,745 20,745 20,745 20,745 20,745 20,745
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,710 22,710 22,710 22,710 22,710 22,710 22,710
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,236 27,236 27,236 27,236 27,236 27,236 27,236
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,236 27,236 27,236 27,236 27,236 27,236 27,236
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 109,665 109,665 109,665 109,665 109,665 109,665 109,665
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 127,018 127,018 127,018 127,018 127,018 127,018 127,018
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 393,113 393,113 393,113 393,113 393,113 393,113 393,113
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 147,628 147,628 147,628 147,628 147,628 147,628 147,628
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 243,362 243,362 243,362 243,362 243,362 243,362 243,362
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,077,046 1,077,046 1,077,046 1,077,046 1,077,046 1,077,046 1,077,046
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,240,933 1,240,933 1,240,933 1,240,933 1,240,933 1,240,933 1,240,933
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,526 14,526 14,526 14,526 14,526 14,526 14,526
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,813 12,813 12,813 12,813 12,813 12,813 12,813
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,723 31,723 31,723 31,723 31,723 31,723 31,723
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 125,762 125,762 125,762 125,762 125,762 125,762 125,762
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 187,330 187,330 187,330 187,330 187,330 187,330 187,330
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,589 30,589 30,589 30,589 30,589 30,589 30,589
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 105,413 105,413 105,413 105,413 105,413 105,413 105,413
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 156,258 156,258 156,258 156,258 156,258 156,258 156,258
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,927 30,927 30,927 30,927 30,927 30,927 30,927
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 63,782 63,782 63,782 63,782 63,782 63,782 63,782
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 256,994 256,994 256,994 256,994 256,994 256,994 256,994
1.32 UNIÓN REPARACION PVC 4" UN ### 74,426 74,426 74,426 74,426 74,426 74,426 74,426
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 299,024 299,024 299,024 299,024 299,024 299,024 299,024
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 179,149 179,149 179,149 179,149 179,149 179,149 179,149
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 510,282 510,282 510,282 510,282 510,282 510,282 510,282
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### i 1,367,283 1,367,283 1,367,283 1,367,283 1,367,283 1,367,283 1,367,283
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ###
i 2,020,337 2,020,337 2,020,337 2,020,337 2,020,337 2,020,337 2,020,337
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2### 10,904 10,904 10,904 10,904 10,904 10,904 10,904
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2### 24,905 24,905 24,905 24,905 24,905 24,905 24,905
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3### 70,276 68,032 74,203 82,057 73,642 85,422 80,374
2.5 RELLENO TIPO 2 "RECEBO" M3### 79,657 69,377 76,230 96,791 88,224 105,358 101,931
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3### 85,091 74,811 81,664 102,225 93,658 110,792 107,365
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3### 85,249 93,448 92,423 114,970 104,721 96,522 88,323
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3### 62,291 70,649 69,605 92,589 82,142 73,784 65,426
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3### 95,590 92,812 100,452 110,176 99,758 114,343 108,092
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 117,233 117,233 117,233 117,233 117,233 117,233 117,233
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,222,652 1,222,652 1,222,652 1,222,652 1,222,652 1,222,652 1,222,652
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 153,216 153,216 153,216 153,216 153,216 153,216 153,216
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,416,151 1,416,151 1,416,151 1,416,151 1,416,151 1,416,151 1,416,151
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 987,014 987,014 987,014 987,014 987,014 987,014 987,014
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,946 62,946 62,946 62,946 62,946 62,946 62,946
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 116,376 116,376 116,376 116,376 116,376 116,376 116,376
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 274,841 274,841 274,841 274,841 274,841 274,841 274,841
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 274,834 274,834 274,834 274,834 274,834 274,834 274,834
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 441,258 441,258 441,258 441,258 441,258 441,258 441,258
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 116,425 116,425 116,425 116,425 116,425 116,425 116,425
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 116,425 116,425 116,425 116,425 116,425 116,425 116,425
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 274,841 274,841 274,841 274,841 274,841 274,841 274,841
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 274,841 274,841 274,841 274,841 274,841 274,841 274,841
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 441,258 441,258 441,258 441,258 441,258 441,258 441,258
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 442,842 442,842 442,842 442,842 442,842 442,842 442,842
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 719,252 719,252 719,252 719,252 719,252 719,252 719,252
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,154,434 1,154,434 1,154,434 1,154,434 1,154,434 1,154,434 1,154,434
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 71,327 71,327 71,327 71,327 71,327 71,327 71,327
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 370,519 370,519 370,519 370,519 370,519 370,519 370,519
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 415,631 415,631 415,631 415,631 415,631 415,631 415,631
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,150,299 1,150,299 1,150,299 1,150,299 1,150,299 1,150,299 1,150,299
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### i 67,250 67,222 67,300 67,401 67,293 67,444 67,379
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ###
i 335,861 335,861 335,861 335,861 335,861 335,861 335,861
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 51,121 51,121 51,121 51,121 51,121 51,121 51,121
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 72,316 72,316 72,316 72,316 72,316 72,316 72,316
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 104,374 104,374 104,374 104,374 104,374 104,374 104,374
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 160,224 160,224 160,224 160,224 160,224 160,224 160,224
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 257,534 257,534 257,534 257,534 257,534 257,534 257,534
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 373,569 373,569 373,569 373,569 373,569 373,569 373,569
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 472,775 472,775 472,775 472,775 472,775 472,775 472,775
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 621,636 621,636 621,636 621,636 621,636 621,636 621,636
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 855,161 855,161 855,161 855,161 855,161 855,161 855,161
5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2### 74,393 74,244 74,655 75,179 74,618 75,403 75,066
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2### 88,173 88,024 88,435 88,959 88,398 89,183 88,846
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2### i 54,209 53,886 54,774 55,905 54,694 56,390 55,663
p
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2###
i 58,977 58,663 59,527 60,627 59,448 61,098 60,391
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2### o 59,266 58,961 59,800 60,868 59,724 61,326 60,639
5.6 BORDE SEPARADOR VERDE A-170 ML ### 258,540 258,488 258,632 258,815 258,619 258,894 258,776
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,253 18,214 18,321 18,456 18,311 18,514 18,427
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 38,799 38,572 39,198 39,995 39,141 40,337 39,824
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 84,645 84,617 84,694 84,792 84,687 84,834 84,771
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 559,674 558,963 560,918 563,406 560,740 564,472 562,873
5.11 LOSETA PREFABRICADA A-40 M2### 62,895 62,775 63,104 63,523 63,074 63,703 63,433
5.12 LOSETA PREFABRICADA A-60 M2### 91,737 91,618 91,947 92,366 91,917 92,546 92,276
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE
5.13 3000 PSI ML ### 32,783 32,657 33,003 33,443 32,971 33,631 33,348
6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 205,258 205,108 205,520 206,043 205,482 206,267 205,931
6.2 BANCA EN CONCRETO M-30 UN ### 677,142 676,933 677,509 678,242 677,457 678,556 678,085
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 218,107 218,076 218,162 218,272 218,155 218,319 218,249
6.4 BOLARDO M-60 CONCRETO UN ### 163,047 162,867 163,361 163,989 163,316 164,259 163,855
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 164,915 164,735 165,229 165,857 165,184 166,126 165,722
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 193,676 193,488 194,006 194,666 193,959 194,948 194,524
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 59,447 59,332 59,647 60,048 59,619 60,220 59,962
6.8 BORDILLO PREFABRICADO A-80 ML ### 69,088 68,960 69,312 69,761 69,280 69,953 69,665
6.9 CANECA M-120 UN ### 317,537 317,509 317,587 317,688 317,580 317,731 317,666
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 836,575 836,485 836,732 837,046 836,709 837,181 836,979
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,437,998 3,437,938 3,438,102 3,438,312 3,438,087 3,438,401 3,438,267
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,536,773 3,536,713 3,536,877 3,537,087 3,536,862 3,537,176 3,537,042
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 493,918 493,855 494,028 494,247 494,012 494,342 494,200
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 653,003 652,752 653,443 654,323 653,380 654,700 654,134
6.15 BANCA EN MADERA M-50 UN ### 543,921 543,921 543,921 543,921 543,921 543,921 543,921
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 250,995 250,905 251,152 251,466 251,130 251,601 251,399
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 585,653 585,582 585,779 586,029 585,761 586,137 585,975
6.18 POSTE HISTÓRICO M-131 UN ### 6,532,890 6,532,441 6,533,676 6,535,246 6,533,563 6,535,919 6,534,910
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
7 SEÑALIZACIÓN i
p
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ###
i 4,108 4,108 4,108 4,108 4,108 4,108 4,108
7.2 MARCA VIAL CON PINTURA EN FRÍO M2### o 43,988 43,988 43,988 43,988 43,988 43,988 43,988
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 318,728 318,702 318,774 318,866 318,768 318,905 318,846
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 501,096 500,970 501,316 501,755 501,284 501,944 501,661
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 237,961 237,935 238,007 238,099 238,001 238,138 238,079
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 252,781 252,755 252,827 252,919 252,821 252,958 252,899
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 264,003 263,977 264,049 264,141 264,043 264,180 264,121
7.8 TACHAS REFLECTIVAS UN ### 13,763 13,763 13,763 13,763 13,763 13,763 13,763
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,701 14,701 14,701 14,701 14,701 14,701 14,701
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M
7.10 (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 119,768 119,768 119,768 119,768 119,768 119,768 119,768
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
VÍAS (SEGÚNpESPECIFICACIONES TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y o
1.1 201 P RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO
1.2 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM) M3### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO
1.3 200.1 DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE
1.4 200.2 CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM) M3### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318
2.4 220.1 TERRAPLENES M3### 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3### 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3### 7,499 7,499 7,499 7,499 7,499 7,499 7,499
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 EXISTENTE
M2### 481 481 481 481 481 481 481
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3### 363,830 366,201 370,752 388,813 376,617 382,092 373,721
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3### 372,473 374,844 379,395 397,456 385,260 390,735 382,364
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3### 495,983 492,875 501,422 512,301 500,646 516,962 509,970
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3### 589,445 586,214 595,101 606,410 594,293 611,256 603,987
4.31 681.1 GAVIÓN M3### 179,296 190,367 188,983 219,429 205,590 194,519 183,448
4.32 681.1 GAVIÓN MALLA PVC M3### 183,527 194,598 193,214 223,660 209,821 198,750 187,678
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO
4.33 672.1 CLASE E, 2500 PSI ML ### 41,009 40,819 41,343 42,011 41,296 42,297 41,868
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO
4.34 672.1 CLASE E, 2500 PSI ML ### 15,694 15,599 15,861 16,195 15,837 16,338 16,123
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE
4.35 *** REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2### 10,240 10,240 10,240 10,240 10,240 10,240 10,240
SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-
4.36 *** 50 M2### 14,607 14,607 14,607 14,607 14,607 14,607 14,607
SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-
4.37 *** 75 M2### 19,663 19,663 19,663 19,663 19,663 19,663 19,663
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2### 23,575 23,575 23,575 23,575 23,575 23,575 23,575
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN)
M2### 30,297 30,297 30,297 30,297 30,297 30,297 30,297
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3### 148,852 138,967 145,557 165,327 157,089 173,564 170,269
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
CONSTRUCCIÓN
DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS