GOBERNACIÓN DE CUNDINAMARCA

LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)


M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
CONSTRUCCIÓN p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,993,076 2,011,011 2,027,950 2,012,008
1.2 CAMPAMENTO 9 M2 UN ### 1,162,731 1,171,698 1,180,168 1,172,197
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,092 14,092 14,092 14,092
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,797 15,797 15,797 15,797
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,273 18,273 18,273 18,273
1.6 CERCA EN TABLA H=2.30 M ML ### 65,276 65,276 65,276 65,276
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 45,934 46,134 46,323 46,145
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,348 21,548 21,737 21,559
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 9,803 9,803 9,803 9,803
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
1.37 DESMONTE MUROS SECOS M2 ###
i 15,459 15,459 15,459 15,459
p
1.38 DESMONTE MARCOS Y PUERTAS UN ###i 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ###o 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 897,668 899,667 903,843 900,475
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,354 10,354 10,354 10,354
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,732 3,732 3,732 3,732
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,668,833 2,668,833 2,668,833 2,668,833
1.44 RED TELEFÓNICA PROVISIONAL UN ### 247,168 247,168 247,168 247,168
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
2 CIMIENTOS
i
p
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ###i 86,050 86,050 125,458 98,044
2.2 BASE ARENA CEMENTO 1:20 M3 ###o 195,329 211,572 226,912 212,474
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,022 22,022 22,022 22,022
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 641,015 660,486 678,877 661,569
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 644,421 664,824 684,094 665,957
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 600,398 619,503 637,546 620,564
2.9 PILOTE DE MADERA D=20 CM ML ### 49,628 49,628 49,628 49,628
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.10 DE 5 KM) ML ### 153,044 153,044 153,044 153,044
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.11 DE 5 KM) ML ### 190,717 190,717 190,717 190,717
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.12 DE 5 KM)
ML ### 236,274 236,274 236,274 236,274
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.13 DE 5 KM) ML ### 297,601 297,601 297,601 297,601
2.14 PILOTE HINCADO 25X25 ML ### 104,971 106,383 107,717 106,462
2.15 PILOTE HINCADO 30X30 ML ### 129,553 131,600 133,534 131,714
2.16 DADOS EN CONCRETO 3500PSI M3 ### 586,249 605,353 623,397 606,414
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 91,564 91,564 91,564 91,564

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 38,180 38,281 38,376 38,286
3.2 SIFÓN EN PVC 6" UN ### 196,830 196,930 197,026 196,936
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 459,363 467,911 494,978 474,167
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 226,707 229,381 233,509 230,018
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 259,842 264,323 271,072 265,338
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 343,041 350,660 360,374 351,850
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 104,446 104,446 104,675 104,516
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,274,782 1,274,782 1,277,071 1,275,479
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 114,885 116,000 117,053 116,062
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 72,423 73,011 73,567 73,044
3.11 TUBERÍA DRENAJE PVC 110 ML ### 27,683 27,988 28,276 28,005
3.12 TUBERÍA DRENAJE PVC 160 ML ### 44,583 44,887 45,175 44,904
3.13 TUBERÍA DRENAJE PVC 200 ML ### 58,473 58,900 59,303 58,923
3.14 TUBERÍA DRENAJE PVC 250 ML ### 80,010 80,498 80,958 80,525
3.15 TUBERÍA DRENAJE PVC 315 ML ### 110,703 111,130 111,533 111,154
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ###
i 950,009 954,886 959,493 955,157
p
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ###i 1,341,812 1,351,567 1,360,780 1,352,108
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ###o 1,745,724 1,765,233 1,783,659 1,766,316

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,018 42,018 42,018 42,018
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 55,436 55,436 55,436 55,436
4.3 COLUMNAS 3500 PSI M3 ### 805,952 825,056 843,100 826,117
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 261,927 282,756 304,122 285,144
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI
M2 ### 98,211 100,066 101,817 100,169
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI M2 ### 115,798 118,024 120,126 118,147
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 129,548 132,515 135,318 132,680
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 136,684 139,837 142,815 140,012
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 156,600 160,496 164,174 160,712
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 174,176 178,627 182,831 178,874
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 193,312 198,320 203,050 198,598
4.12 ENTREPISO VIGUETA PLACA M2 ### 99,270 99,614 99,938 99,633
4.13 ESCALERA MACIZA 3500 PSI M3 ### 953,112 972,216 990,260 973,277
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 95,100 95,409 95,701 95,426
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 79,305 81,215 83,020 81,321
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 89,204 91,541 93,748 91,671
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 103,953 106,884 109,652 107,047
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 705,757 724,862 742,905 725,922
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 49,421 50,019 50,583 50,052
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 281,471 290,003 298,061 290,477
4.21 ACERO FIGURADO 37000 PSI KG ### 4,168 4,168 4,168 4,168
4.22 ACERO FIGURADO 60000 PSI KG ### 4,371 4,371 4,371 4,371
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,145 6,145 6,145 6,145
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 852,611 871,715 889,759 872,776
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 777,085 797,988 817,731 799,149
4.26 VIGA AÉREA 3500 PSI M3 ### 846,480 865,584 883,628 866,645
4.27 VIGA CINTA 3500 PSI M3 ### 826,397 845,501 863,545 846,562
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,036,830 1,055,935 1,073,978 1,056,995
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 319,851 340,377 359,762 341,517

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,747 30,247 30,718 30,274
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ###
i 50,121 50,620 51,092 50,648
p
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ###i 35,003 35,104 35,199 35,110
5.4 ARCOS EN LADRILLO PRENSADO ML ###o 163,829 164,031 164,222 164,042
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,216 44,814 45,378 44,847
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,422 27,731 28,023 27,748
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 98,793 99,197 99,578 99,219
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 91,077 93,069 94,950 93,180
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 91,219 91,219 91,219 91,219
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,533 53,533 53,533 53,533
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 87,859 87,859 87,859 87,859
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,853 51,853 51,853 51,853
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 101,818 101,818 101,818 101,818
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,154 60,154 60,154 60,154
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 113,220 113,220 113,220 113,220
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 65,855 65,855 65,855 65,855
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 40,656 40,859 41,050 40,870
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,642 24,743 24,839 24,749
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 52,932 53,067 53,195 53,075
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 31,845 31,913 31,977 31,917
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,548 59,683 59,811 59,691
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 35,827 35,894 35,958 35,898
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 98,952 99,628 100,266 99,665
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,555 58,893 59,212 58,912
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,279 37,414 37,542 37,421
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,620 22,688 22,752 22,692
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 74,118 74,389 74,644 74,404
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,720 44,855 44,983 44,863
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 88,144 88,453 88,745 88,470
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,410 53,565 53,711 53,574
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 181,522 182,468 183,362 182,521
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 109,155 109,628 110,075 109,654
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 90,655 91,300 91,910 91,336
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,666 54,989 55,293 55,007
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 46,820 47,123 47,408 47,139
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,509 28,660 28,803 28,668
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,762 33,898 34,025 33,905
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,587 20,655 20,718 20,658
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 50,954 51,224 51,480 51,239
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,258 31,393 31,521 31,401
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
5.41 MURO TOLETE COMÚN 0.25 M M2 ###
i 98,261 98,667 99,050 98,690
p
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ###i 59,879 60,082 60,273 60,093
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ###o 71,771 72,041 72,296 72,056
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,367 43,502 43,629 43,509
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 150,846 151,792 152,686 151,845
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 91,814 92,287 92,734 92,313
5.47 REMATES LADRILLO PRENSADO ML ### 31,733 31,834 31,929 31,839
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 37,098 37,563 38,001 37,588
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 62,403 63,022 63,606 63,056
5.50 LAVADA DE FACHADA M2 ### 5,245 5,245 5,245 5,245
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 50,482 50,981 51,453 51,009
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,601 10,601 10,601 10,601
5.53 ANCLAJE 3/8" L=30CM UN ### 13,964 13,964 13,964 13,964
5.54 ANCLAJE 1/2" L=50CM UN ### 18,235 18,235 18,235 18,235
5.55 ANCLAJE 5/8" L=70CM UN ### 25,455 25,455 25,455 25,455
5.56 ANCLAJE 3/4" L=70CM UN ### 37,859 37,859 37,859 37,859
5.57 ANCLAJE 1" L= 70CM UN ### 4,926 5,067 5,201 5,075

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,138 16,138 16,138 16,138
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,743 5,844 5,939 5,849
6.3 FILOS O DILATACIONES S/MURO ML ### 6,929 7,030 7,125 7,035
6.4 GOTERA EN MORTERO 1:4 ML ### 8,202 8,303 8,398 8,308
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,816 6,816 6,816 6,816
6.6 MALLA BAJO ENTRAMADO M2 ### 13,681 13,681 13,681 13,681
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,979 25,431 25,857 25,456
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,084 15,309 15,523 15,322
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,079 21,363 21,631 21,379
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,823 12,965 13,099 12,973
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,088 21,540 21,966 21,565
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,828 13,054 13,267 13,066
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,079 21,363 21,631 21,379
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,823 12,965 13,099 12,973
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,067 22,389 22,693 22,407
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,316 13,477 13,629 13,486
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,543 17,759 17,963 17,771
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,767 10,875 10,977 10,881
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,550 17,894 18,219 17,913
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,770 10,942 11,105 10,952
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ###
i 21,857 22,141 22,409 22,157
p
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ###i 13,193 13,335 13,469 13,342
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ###o 21,866 22,318 22,745 22,343
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,197 13,423 13,636 13,435
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,160 18,504 18,829 18,523
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,058 11,230 11,392 11,239
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,756 23,207 23,634 23,233
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,046 14,272 14,485 14,284

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 26,778 27,184 27,567 27,206
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE) M2 ### 83,054 84,050 84,990 84,105
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,131 55,131 55,131 55,131
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,071 22,071 22,071 22,071
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,622 34,622 34,622 34,622
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 80,469 80,469 80,469 80,469
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,078 63,078 63,078 63,078
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 36,812 36,812 36,812 36,812
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 84,319 84,319 84,319 84,319
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 100,628 100,628 100,628 100,628
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 147,742 147,742 147,742 147,742
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 58,586 58,586 58,586 58,586
7.13 CANAL PVC AMAZONAS ML ### 81,527 81,527 81,527 81,527
7.14 CANAL PVC RAINGO ML ### 74,174 74,174 74,174 74,174
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 131,126 131,126 131,126 131,126
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 76,510 76,510 76,510 76,510
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 56,268 56,268 56,268 56,268
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,302 32,302 32,302 32,302
7.19 TEJA DE BARRO M2 ### 59,229 59,733 60,210 59,761
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 46,898 46,898 46,898 46,898
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,010 43,010 43,010 43,010
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,470 36,470 36,470 36,470
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 35,693 35,693 35,693 35,693
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 35,960 35,960 35,960 35,960
7.25 TEJA TERMOACÚSTICA M2 ### 50,455 50,455 50,455 50,455
7.26 TEJA PLÁSTICA No.6 M2 ### 44,397 44,397 44,397 44,397
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 81,038 81,038 81,038 81,038
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 149,362 149,362 149,362 149,362
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
7.29 TEJA SIN TRASLAPO M2 ###
i 67,248 67,248 67,248 67,248
p
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ###i 42,606 42,606 42,606 42,606
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ###o 33,312 33,312 33,312 33,312
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2",
7.32 15 MM) M2 ### 57,788 57,788 57,788 57,788
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,052 20,052 20,052 20,052
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,061 24,061 24,061 24,061
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,023 26,023 26,023 26,023
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,424 33,424 33,424 33,424
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,142 22,142 22,142 22,142
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,089 52,089 52,089 52,089
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 353,312 353,312 353,312 353,312
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 409,286 409,286 409,286 409,286
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 269,558 269,558 269,558 269,558
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 287,695 287,695 287,695 287,695

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 455,180 475,650 494,983 476,787
8.2 CONCRETO 3500 PSI M3 ### 396,453 415,001 432,519 416,031
8.3 CONCRETO 3000 PSI M3 ### 393,701 412,605 430,460 413,656
8.4 CONCRETO 2500 PSI M3 ### 352,726 372,643 391,453 373,749
8.5 CONCRETO 2000 PSI M3 ### 327,614 347,602 366,480 348,712
8.6 CONCRETO 1500 PSI M3 ### 295,424 315,352 334,173 316,459
8.7 MORTERO SECO 1:10 M3 ### 237,902 251,825 264,973 252,598
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 447,910 461,429 474,197 462,180
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 448,344 469,846 490,154 471,041
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 506,649 526,759 545,752 527,877
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 730,709 750,819 769,812 751,937

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 122,796 122,796 122,796 122,796
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,962 4,063 4,159 4,069
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 137,627 137,627 137,627 137,627
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 168,300 168,300 168,300 168,300
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 243,718 243,718 243,718 243,718
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 271,207 271,207 271,207 271,207
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 298,729 298,729 298,729 298,729
9.8 HOJA PUERTA FORTEC 0.81 UN ### 198,254 198,254 198,254 198,254
9.9 HOJA PUERTA FORTEC 0.91 UN ### 224,714 224,714 224,714 224,714
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
9.10 HOJA PUERTA FORTEC 1.50 UN ###
i 330,554 330,554 330,554 330,554
p
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ###i 125,488 125,488 125,488 125,488
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ###o 166,501 166,501 166,501 166,501
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 185,023 185,023 185,023 185,023
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 470,794 470,794 470,794 470,794
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,032 42,032 42,032 42,032
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,305 26,305 26,305 26,305
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 99,389 99,389 99,389 99,389
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 120,518 120,518 120,518 120,518
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,661 93,661 93,661 93,661
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,151 29,151 29,151 29,151
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,151 29,151 29,151 29,151
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,643 27,643 27,643 27,643
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,322 42,322 42,322 42,322
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,344 52,344 52,344 52,344
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,033 63,033 63,033 63,033
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,728 75,728 75,728 75,728
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 355,850 355,850 355,850 355,850
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 248,951 248,951 248,951 248,951
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,636 33,636 33,636 33,636
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 42,990 42,990 42,990 42,990
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,344 52,344 52,344 52,344
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,706 65,706 65,706 65,706

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 75,909 75,909 75,909 75,909
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 210,280 210,280 210,280 210,280
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO) ML ### 80,503 80,503 80,503 80,503
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,547 144,547 144,547 144,547
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 136,338 136,338 136,338 136,338
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,523 89,523 89,523 89,523
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 210,728 210,728 210,728 210,728
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 109,917 109,917 109,917 109,917
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,603 6,603 6,603 6,603
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL
10.10 GALVANIZADO 2") M2 ### 99,771 99,771 99,771 99,771
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 120,590 120,590 120,590 120,590
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,066 41,066 41,066 41,066
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ###
i 535,821 535,821 535,821 535,821
p
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ###i 192,995 192,995 192,995 192,995
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ###o 217,124 217,124 217,124 217,124
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 488,889 488,889 488,889 488,889
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 128,586 128,586 128,586 128,586
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 390,597 390,597 390,597 390,597
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,029 6,029 6,029 6,029
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 275,055 275,055 275,055 275,055
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 122,302 122,302 122,302 122,302
10.21 REJILLA PISO 0.30 M M2 ### 85,999 85,999 85,999 85,999
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 88,857 88,857 88,857 88,857
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS,
10.23 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,591 10,591 10,591 10,591
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 11,739 11,739 11,739 11,739
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.25 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
KG ### 9,357 9,357 9,357 9,357
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 221,305 221,305 221,305 221,305
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 266,453 266,453 266,453 266,453
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,071 22,071 22,071 22,071
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 34,622 34,622 34,622 34,622
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,271 33,271 33,271 33,271
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 42,601 42,601 42,601 42,601
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 87,688 87,688 87,688 87,688
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 222,656 222,656 222,656 222,656
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,278 44,278 44,278 44,278
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 35,110 35,110 35,110 35,110
11.13 NIPLE PASAMURO 2" UN ### 66,957 66,957 66,957 66,957
11.14 NIPLE PASAMURO 4" UN ### 100,000 100,000 100,000 100,000
11.15 PUNTO AGUA CALIENTE CPVC UN ### 84,218 84,218 84,218 84,218
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 61,675 61,675 61,675 61,675
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 65,548 65,548 65,548 65,548
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ###
i 82,818 82,818 82,818 82,818
p
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ###i 66,593 66,593 66,593 66,593
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ###o 83,122 83,122 83,122 83,122
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 88,849 88,849 88,849 88,849
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 73,422 73,422 73,422 73,422
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,464 12,464 12,464 12,464
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,509 17,509 17,509 17,509
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 22,869 22,869 22,869 22,869
11.26 RED SUMINISTRO PVC 1" ML ### 14,151 14,151 14,151 14,151
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,470 8,470 8,470 8,470
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 50,842 50,842 50,842 50,842
11.29 RED SUMINISTRO PVC 2" ML ### 32,555 32,555 32,555 32,555
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,595 10,595 10,595 10,595
11.31 RED SANITARIA PVC-S 2" ML ### 25,184 25,184 25,184 25,184
11.32 RED SANITARIA PVC-S 3" ML ### 34,910 34,910 34,910 34,910
11.33 RED SANITARIA PVC-S 4" ML ### 47,354 47,354 47,354 47,354
11.34 RED SANITARIA PVC-S 6" ML ### 88,309 88,309 88,309 88,309
11.35 REGISTRO 1" UN ### 107,435 107,435 107,435 107,435
11.36 REGISTRO 1/2" UN ### 59,925 59,925 59,925 59,925
11.37 REGISTRO 3/4" UN ### 76,224 76,224 76,224 76,224
11.38 REGISTRO 1 1/2" UN ### 183,905 183,905 183,905 183,905
11.39 REGISTRO 2 1/2" UN ### 378,886 378,886 378,886 378,886
11.40 REGISTRO 2" UN ### 280,079 280,079 280,079 280,079
11.41 REVENTILACIÓN 2" ML ### 17,580 17,580 17,580 17,580
11.42 REVENTILACIÓN 3" ML ### 22,178 22,178 22,178 22,178
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 172,471 172,471 172,471 172,471
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 280,413 280,413 280,413 280,413
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 466,395 466,395 466,395 466,395
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 40,332 40,332 40,332 40,332
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 47,544 47,544 47,544 47,544
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 61,145 61,145 61,145 61,145
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 69,198 69,198 69,198 69,198

11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 89,146 89,146 89,146 89,146

11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 103,501 103,501 103,501 103,501
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 153,176 153,176 153,176 153,176
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 61,809 61,809 61,809 61,809
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ###
i 62,059 62,059 62,059 62,059
p
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ###i 39,918 39,918 39,918 39,918
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ###o 49,126 49,126 49,126 49,126
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,155 4,155 4,155 4,155
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,539 6,539 6,539 6,539
11.59 GABINETE TIPO III UN ### 1,011,365 1,011,365 1,011,365 1,011,365
11.60 GABINETE TIPO I UN ### 773,488 773,488 773,488 773,488
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,591,036 2,591,036 2,591,036 2,591,036
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,160,708 2,160,708 2,160,708 2,160,708
11.63 VÁLVULA MARIPOSA 3" UN ### 629,510 629,510 629,510 629,510
11.64 VÁLVULA MARIPOSA 4" UN ### 813,673 813,673 813,673 813,673
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 312,322 312,322 312,322 312,322

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 362,201 362,201 362,201 362,201
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 57,544 57,544 57,544 57,544
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 68,076 68,076 68,076 68,076
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 75,637 75,637 75,637 75,637
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 89,027 89,027 89,027 89,027
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,133 54,133 54,133 54,133
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,676 61,676 61,676 61,676
12.8 STRIP TELEFÓNICO 10 PARES UN ### 142,660 142,660 142,660 142,660
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 55,559 55,559 55,559 55,559
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 127,623 127,623 127,623 127,623
12.11 SALIDA T.V PVC COMPLETA. UN ### 76,376 76,376 76,376 76,376
12.12 SALIDA BIFÁSICA C.N. UN ### 45,280 45,280 45,280 45,280
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,570 95,570 95,570 95,570
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 408,196 408,196 408,196 408,196
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 543,435 543,435 543,435 543,435
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,518 3,518 3,518 3,518
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,646 4,646 4,646 4,646
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,225 7,225 7,225 7,225
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,927 12,927 12,927 12,927
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 271,478 271,478 271,478 271,478
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,799 76,799 76,799 76,799
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 103,812 103,812 103,812 103,812
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,623 42,623 42,623 42,623
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,393,932 1,393,932 1,393,932 1,393,932
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,033,174 1,033,174 1,033,174 1,033,174
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
12.26 POSTE METÁLICO 6M UN ###
i 1,287,382 1,287,382 1,287,382 1,287,382
p
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ###i 598,233 598,233 598,233 598,233
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ###o 109,552 109,552 109,552 109,552
12.29 LUMINARIA 70W SODIO UN ### 501,821 501,821 501,821 501,821
12.30 LUMINARIA 150W SODIO UN ### 627,674 627,674 627,674 627,674
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,656,913 1,656,913 1,656,913 1,656,913
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,220,321 1,220,321 1,220,321 1,220,321

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,004 41,778 42,508 41,821
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 40,616 41,390 42,120 41,433
13.3 ALISTADO PARA LISTÓN M2 ### 15,017 15,171 15,317 15,180
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 30,528 32,075 33,536 32,161
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 87,277 88,824 90,285 88,910
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,801 27,201 27,578 27,223
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 58,003 59,995 61,876 60,105
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 80,381 83,568 86,578 83,745
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,379 30,379 30,379 30,379
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,077 23,077 23,077 23,077
13.11 PERMA PLY 2 CAPAS M2 ### 27,117 27,117 27,117 27,117
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 47,205 48,998 50,691 49,097
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 55,301 57,492 59,561 57,614
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 80,126 83,512 86,709 83,700
13.15 TRITURADO FINO 1/2 M3 ### 90,253 102,601 114,265 103,288
13.16 TRITURADO GRUESO 3/4 M3 ### 96,928 107,658 126,946 111,040

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,866 58,175 58,467 58,192
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,604 34,759 34,905 34,767
14.3 ADOQUÍN CONCRETO 6CM M2 ### 66,844 67,618 68,348 67,661
14.4 ADOQUÍN CONCRETO 8CM M2 ### 70,144 70,918 71,648 70,961
14.5 ADOQUÍN GRES PEATONAL M2 ### 74,404 75,178 75,908 75,221
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 75,989 76,299 76,591 76,316
14.7 GRAVILLA PARA GRADAS ML ### 37,928 38,227 38,510 38,244
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 166,444 167,836 169,151 167,914
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 47,729 48,482 49,194 48,524
14.10 GUARDAESCOBA EN GRANITO ML ### 44,207 44,207 44,207 44,207
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,614 10,914 11,196 10,930
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,390 9,390 9,390 9,390
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
14.13 GUARDAESCOBA PVC CEDRO ML ###
i 12,595 12,595 12,595 12,595
p
14.14 GUARDAESCOBA PINO CARIBE ML ###i 10,590 10,590 10,590 10,590
14.15 GUARDAESCOBA CEDRO BLANCO ML ###o 17,675 17,675 17,675 17,675
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,345 34,345 34,345 34,345
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,334 9,334 9,334 9,334
14.18 LISTÓN M.H. AMARILLO M2 ### 74,755 74,755 74,755 74,755
14.19 PASO ESCALERA GRANITO ML ### 120,981 122,064 123,086 122,124
14.20 PIRLANES ALUMINIO ML ### 7,647 7,647 7,647 7,647
14.21 PIRLANES LADRILLO ML ### 32,273 32,474 32,665 32,486
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 46,006 46,006 46,006 46,006
14.23 PISO VINILO TRÁFICO PESADO M2 ### 53,421 53,421 53,421 53,421
14.24 PULIDA LACADA PISO MADERA M2 ### 49,497 49,497 49,497 49,497
14.25 TABLETA DE GRES 25X25 M2 ### 50,290 50,599 50,891 50,616
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,341 56,650 56,942 56,667
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,056 11,056 11,056 11,056
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 49,779 50,082 50,368 50,099
14.29 JABONERA PORCELANA ACUARIO UN ### 20,681 20,681 20,681 20,681
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA
14.30 SIMPLE)
UN ### 123,591 123,591 123,591 123,591
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,054 10,054 10,054 10,054
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,600 22,600 22,600 22,600
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,553 14,553 14,553 14,553
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,143 14,143 14,143 14,143
14.35 REMATES BOCEL ALUMINIO ML ### 8,652 8,652 8,652 8,652
14.36 REMATES BOCEL PORCELANA ML ### 8,802 8,802 8,802 8,802
14.37 TAPA REGISTRO 20X20 UN ### 19,169 19,169 19,169 19,169
14.38 TAPA REGISTRO 6X6 UN ### 17,483 17,483 17,483 17,483
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,654 18,654 18,654 18,654
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 21,565 21,565 21,565 21,565
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 65,941 66,250 66,542 66,267
14.42 MEDIA CAÑA EN GRANITO ML ### 77,514 77,514 77,514 77,514
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,603 34,603 34,603 34,603
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,350 13,350 13,350 13,350
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 101,663 101,663 101,663 101,663
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 123,182 123,182 123,182 123,182

15 CIELO RASO
15.1 APLIQUE YESO ML ### 72,849 72,849 72,849 72,849
15.2 ARMADURA MADERA Y MALLA M2 ### 36,321 36,321 36,321 36,321
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ###
i 55,761 55,761 55,761 55,761
p
15.4 CIELO RASO DURACUSTIC M2 ###i 68,317 68,317 68,317 68,317
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ###o 51,034 51,034 51,034 51,034
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 94,423 94,423 94,423 94,423
15.7 CORNISAS YESO ML ### 48,869 48,869 48,869 48,869
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 104,270 104,270 104,270 104,270
15.9 MALLA CON VENA M2 ### 13,586 13,586 13,586 13,586

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
16.2 DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 84,264 84,264 123,672 96,258
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 111,264 127,181 142,214 128,066
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 170,484 203,038 240,733 209,892
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 75,956 75,956 115,364 87,950
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 159,995 146,288 230,244 171,989
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 167,453 200,008 237,702 206,861

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 302,265 302,265 302,265 302,265
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 889,371 889,371 889,371 889,371
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 482,250 482,250 482,250 482,250
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 140,548 140,548 140,548 140,548
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 196,292 196,292 196,292 196,292
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 182,361 182,361 182,361 182,361
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 400,356 400,356 400,356 400,356
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,022,652 1,022,652 1,022,652 1,022,652
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 291,075 291,075 291,075 291,075
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 206,566 206,566 206,566 206,566
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,701 82,701 82,701 82,701
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm
17.12 (INCLUYE ACCESORIOS Y GRIFERÍA) UN ###p 249,797 249,797 249,797 249,797
i
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60
17.13 UN ###o 367,545 367,545 367,545 367,545
cm (INCLUYE ACCESORIOS Y GRIFERÍA)

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,384 8,384 8,384 8,384
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,102 3,102 3,102 3,102
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,200 11,200 11,200 11,200
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,393 42,393 42,393 42,393
18.5 CARBURO SOBRE PAÑETES M2 ### 5,869 5,869 5,869 5,869
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 65,619 65,619 65,619 65,619
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,496 3,496 3,496 3,496
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,785 2,785 2,785 2,785
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,007 14,007 14,007 14,007
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,053 4,053 4,053 4,053
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,767 14,767 14,767 14,767
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,752 5,752 5,752 5,752
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,551 6,551 6,551 6,551
18.14 ESTUCO M2 ### 7,067 7,067 7,067 7,067
18.15 ESTUCO (LINEAL) ML ### 4,428 4,428 4,428 4,428
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,598 15,598 15,598 15,598
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,678 9,678 9,678 9,678
18.18 LACA PISOS MADERA M2 ### 22,913 22,913 22,913 22,913
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,701 2,701 2,701 2,701
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,197 12,197 12,197 12,197
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,292 3,292 3,292 3,292
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,653 12,653 12,653 12,653
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,119 7,119 7,119 7,119
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,480 4,480 4,480 4,480
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,860 21,860 21,860 21,860
18.26 PINTURA EPÓXICA M2 ### 12,754 12,754 12,754 12,754
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,886 7,886 7,886 7,886

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,051,426 6,051,426 6,051,426 6,051,426
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA
19.2 MOVILIZAR (PAR) UN ### 10,691,949 10,691,949 10,691,949 10,691,949
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,798,192 2,798,192 2,798,192 2,798,192
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ###
i 9,144,450 9,144,450 9,144,450 9,144,450
p
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ###i 8,563,030 8,563,030 8,563,030 8,563,030
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ###o 2,701 2,701 2,701 2,701
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 859,259 859,259 859,259 859,259
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 85,789 85,789 85,789 85,789
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,554,250 1,554,454 1,554,648 1,554,466
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 675,763 680,489 684,952 680,751

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,398 29,398 29,398 29,398
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 43,637 43,637 43,637 43,637
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 54,087 54,087 54,087 54,087
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 17,661 17,661 17,661 17,661
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,385 21,385 21,385 21,385
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,143 29,143 29,143 29,143
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,161 26,161 26,161 26,161
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,578 27,578 27,578 27,578
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,470 34,470 34,470 34,470
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,633 17,633 17,633 17,633
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,103 23,103 23,103 23,103
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,517 35,517 35,517 35,517
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 272,093 272,093 272,093 272,093
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 313,122 313,122 313,122 313,122
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 326,613 326,613 326,613 326,613
20.16 ACOMETIDA GAS 1/2" ML ### 303,126 303,126 303,126 303,126

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 221,275 221,275 221,275 221,275
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 33,884 33,884 33,884 33,884
21.3 SIRENA DE 110 V UN ### 103,401 103,401 103,401 103,401
21.4 CÁMARA CCTV UN ### 263,382 263,382 263,382 263,382
21.5 PARLANTE-CIELO FALSO UN ### 52,056 52,056 52,056 52,056
21.6 AMPLIFICADOR 100W UN ### 572,510 572,510 572,510 572,510
21.7 AMPLIFICADOR 300W UN ### 1,417,824 1,417,824 1,417,824 1,417,824
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,112 45,112 45,112 45,112
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 221,224 221,224 221,224 221,224
21.10 TOMA PARA MICRÓFONO UN ### 44,080 44,080 44,080 44,080
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,761 3,761 3,761 3,761
21.12 SPLITERS UN ### 6,305 6,305 6,305 6,305
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ###
i 18,719 18,719 18,719 18,719
p
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ###i 24,516 24,516 24,516 24,516
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ###o 31,810 31,810 31,810 31,810
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 122,608 122,608 122,608 122,608
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 31,993 31,993 31,993 31,993
21.18 BANDEJA PORTACABLES PARA RACK UN ### 104,525 104,525 104,525 104,525
21.19 RACK 2' X 24" UN ### 184,206 184,206 184,206 184,206
21.20 RACK 3' X 24" UN ### 288,724 288,724 288,724 288,724
21.21 RACK 5' X 24" UN ### 358,996 358,996 358,996 358,996
21.22 RACK 7' X 24" UN ### 392,071 392,071 392,071 392,071
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 575,240 575,240 575,240 575,240
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 339,172 339,172 339,172 339,172
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 103,937 103,937 103,937 103,937
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 13,826 13,826 13,826 13,826
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,247 28,247 28,247 28,247
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,008 5,008 5,008 5,008
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,332 35,332 35,332 35,332
21.30 CANALETA METÁLICA 4X10 CMS ML ### 36,909 36,909 36,909 36,909
21.31 CANALETA METÁLICA 6X10 CMS ML ### 37,696 37,696 37,696 37,696
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,590 24,590 24,590 24,590
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,183 27,183 27,183 27,183
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,273 28,273 28,273 28,273
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 47,424 47,424 47,424 47,424
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 612,861 612,861 612,861 612,861
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 315,107 315,107 315,107 315,107
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 88,795 88,795 88,795 88,795
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,839 1,839 1,839 1,839
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,489 8,489 8,489 8,489
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,640 12,640 12,640 12,640
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,080 21,080 21,080 21,080
21.43 CABLE TELEVISIÓN RG6 ML ### 3,914 3,914 3,914 3,914
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,462 22,462 22,462 22,462
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,628 32,628 32,628 32,628
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,421 19,421 19,421 19,421
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,389 15,389 15,389 15,389
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 617,751 617,751 617,751 617,751
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
URBANISMO p
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 90,456 90,456 90,456 90,456
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 508,893 508,893 508,893 508,893
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,086,136 1,086,136 1,086,136 1,086,136
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 124,593 124,593 124,593 124,593
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 758,339 758,339 758,339 758,339
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,631,667 1,631,667 1,631,667 1,631,667
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,133 13,133 13,133 13,133
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,172 16,172 16,172 16,172
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,278 20,278 20,278 20,278
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,183 22,183 22,183 22,183
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,571 26,571 26,571 26,571
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,571 26,571 26,571 26,571
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 106,446 106,446 106,446 106,446
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 123,312 123,312 123,312 123,312
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 381,545 381,545 381,545 381,545
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 143,252 143,252 143,252 143,252
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 236,152 236,152 236,152 236,152
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,044,638 1,044,638 1,044,638 1,044,638
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,203,532 1,203,532 1,203,532 1,203,532
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,207 14,207 14,207 14,207
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,547 12,547 12,547 12,547
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 30,772 30,772 30,772 30,772
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 122,341 122,341 122,341 122,341
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 182,032 182,032 182,032 182,032
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 29,821 29,821 29,821 29,821
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 102,612 102,612 102,612 102,612
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 151,907 151,907 151,907 151,907
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,108 30,108 30,108 30,108
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 62,043 62,043 62,043 62,043
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 249,574 249,574 249,574 249,574
1.32 UNIÓN REPARACION PVC 4" UN ### 72,364 72,364 72,364 72,364
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 290,323 290,323 290,323 290,323
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 174,430 174,430 174,430 174,430
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 495,464 495,464 495,464 495,464
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,325,851 1,325,851 1,325,851 1,325,851
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ###
i 1,959,039 1,959,039 1,959,039 1,959,039
p
i
2 ALCANTARILLADO - EXCAVACIONES o
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,785 10,785 10,785 10,785
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,666 24,666 24,666 24,666
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 64,505 74,775 84,475 75,346
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 79,230 79,230 118,638 91,223
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 81,016 81,016 120,424 93,010
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 102,237 111,460 123,759 107,361
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 83,186 103,037 126,021 107,216
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 90,667 103,783 116,169 104,511

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 113,784 113,784 113,784 113,784
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,185,562 1,185,562 1,185,562 1,185,562
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 148,671 148,671 148,671 148,671
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,373,165 1,373,165 1,373,165 1,373,165
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 957,145 957,145 957,145 957,145
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,545 62,545 62,545 62,545
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 112,953 112,953 112,953 112,953
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 266,630 266,630 266,630 266,630
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 266,623 266,623 266,623 266,623
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 428,017 428,017 428,017 428,017
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 113,001 113,001 113,001 113,001
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 113,001 113,001 113,001 113,001
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 266,630 266,630 266,630 266,630
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 266,630 266,630 266,630 266,630
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 428,017 428,017 428,017 428,017
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 430,588 430,588 430,588 430,588
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 698,576 698,576 698,576 698,576
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,120,970 1,120,970 1,120,970 1,120,970
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 69,283 69,283 69,283 69,283
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 360,469 360,469 360,469 360,469
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 403,378 403,378 403,378 403,378
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,116,855 1,116,855 1,116,855 1,116,855
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 65,331 65,466 65,594 65,473
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 326,867 326,867 326,867 326,867
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 49,684 49,684 49,684 49,684
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ###
i 70,234 70,234 70,234 70,234
p
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ###i 101,316 101,316 101,316 101,316
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ###o 155,506 155,506 155,506 155,506
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 249,851 249,851 249,851 249,851
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 362,989 362,989 362,989 362,989
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 459,213 459,213 459,213 459,213
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 603,739 603,739 603,739 603,739
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 830,148 830,148 830,148 830,148

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 666,043 677,385 688,098 678,016
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y
4.2 CAÑUELA) ML ### 660,371 670,225 679,532 670,773
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA
4.3 HF)
UN ### 708,798 716,360 723,502 716,780
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 790,663 804,841 818,232 805,629
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y
4.5 CAÑUELA) ML ### 936,631 950,507 963,612 951,278
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y
4.6 TAPA HF)
UN ### 818,120 828,517 838,337 829,095
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 992,981 998,680 1,004,066 998,996
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,440,001 1,456,382 1,471,860 1,457,292
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,965,255 1,995,676 2,024,407 1,997,365
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,612,395 2,662,962 2,710,722 2,665,770
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,819,462 1,819,462 1,819,462 1,819,462
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,845,704 3,845,704 3,845,704 3,845,704
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE
4.13 INTERNO Y DEMOLICIÓN)
UN ### 138,751 139,153 139,533 139,176

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 72,620 73,326 73,993 73,365
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 85,984 86,690 87,357 86,729
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 56,001 58,092 60,067 58,208
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 60,303 62,288 64,163 62,399
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 60,592 62,540 64,379 62,648
5.6 BORDE SEPARADOR VERDE A-170 ML ### 251,887 252,289 252,669 252,312
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,431 18,682 18,919 18,696
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,088 41,562 42,954 41,644
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 83,098 83,313 83,516 83,325
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 556,086 560,885 565,418 561,152
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
5.11 LOSETA PREFABRICADA A-40 M2 ###
i 63,451 64,372 65,241 64,423
p
5.12 LOSETA PREFABRICADA A-60 M2 ###i 91,252 92,172 93,042 92,224
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ###o 33,239 34,033 34,782 34,077
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 53,436 55,043 56,561 55,132
5.15 SARDINEL PREFABRICADO A-10 ML ### 99,223 103,219 107,800 104,027
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,605 61,162 61,688 61,193

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 201,213 202,158 203,051 202,211
6.2 BANCA EN CONCRETO M-30 UN ### 659,769 661,092 662,342 661,166
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 212,868 213,068 213,257 213,079
6.4 BOLARDO M-60 CONCRETO UN ### 160,731 161,865 162,936 161,928
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 162,599 163,733 164,804 163,796
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 190,529 191,728 192,861 191,795
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 58,352 58,892 59,403 58,922
6.8 BORDILLO PREFABRICADO A-80 ML ### 67,206 67,811 68,383 67,845
6.9 CANECA M-120 UN ### 308,475 308,610 308,738 308,617
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 813,833 814,400 814,936 814,432
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,336,230 3,336,608 3,336,965 3,336,629
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,431,994 3,432,372 3,432,729 3,432,393
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 480,038 480,438 480,816 480,460
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 636,073 637,672 639,183 637,761
6.15 BANCA EN MADERA M-50 UN ### 528,344 528,344 528,344 528,344
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 245,617 246,184 246,719 246,215
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 568,423 568,761 569,081 568,780
6.18 POSTE HISTÓRICO M-131 UN ### 6,342,007 6,344,842 6,347,520 6,345,000

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,987 3,987 3,987 3,987
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,946 42,946 42,946 42,946
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 310,272 310,473 310,663 310,484
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 488,772 489,572 490,327 489,616
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 232,900 233,101 233,291 233,112
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 247,268 247,469 247,659 247,480
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 258,148 258,349 258,539 258,360
7.8 TACHAS REFLECTIVAS UN ### 13,409 13,409 13,409 13,409
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,317 14,317 14,317 14,317
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 116,349 116,349 116,349 116,349
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
p
i
o
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS p INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.1 201 P DISTANCIA DE 5KM)
M3 ### 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.2 201 P DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.3 200.1 DISTANCIA DE 5KM) HA ### 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.4 200.2 UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA
1.5 201.7 DE 5KM) M3 ### 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES
M3-KM### 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,190 35,190 35,190 35,190
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.9 600.1 MENOR DE 5 KM)
M3 ### 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.10 600.2 MENOR DE 5 KM) M3 ### 64,804 64,804 64,804 64,804
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 600.3 DISTANCIA MENOR DE 5 KM) M3 ### 79,577 79,577 79,577 79,577
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 600.4 DISTANCIA MENOR DE 5 KM) M3 ### 19,035 19,035 19,035 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES
2.13 600.4 P A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 39,738 39,738 39,738 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A
2.14 600.5 UNA DISTANCIA MENOR DE 5 KM) M3 ### 31,203 31,203 31,203 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE
2.15 600.5 P SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 53,644 53,644 53,644 53,644
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
3 NORMA INV ESTRUCTURA DE PAVIMENTO
i
p
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ###i 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ###o 159,995 146,288 230,244 171,989
3.3 330.1 BASE GRANULAR M3 ### 167,453 200,008 237,702 206,861
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS
3.4 365.1 CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,182 3,182 3,182 3,182
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,111 1,111 1,111 1,111
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 218,295 221,282 224,103 221,448
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 67,254 68,614 69,899 68,690
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 618,189 649,492 685,737 656,082
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 627,114 658,417 694,662 665,007
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 663,497 694,799 731,044 701,389
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 680,664 711,967 748,212 718,557
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 331,746 364,017 389,114 359,381
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 313,092 345,646 383,341 352,500
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 304,590 290,883 374,840 316,584
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 38,019 38,019 38,019 38,019
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 168,435 168,435 168,435 168,435
3.15 311.1 AFIRMADO M3 ### 75,956 75,956 115,364 87,950
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,185 11,381 11,566 11,392
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,457 4,555 4,647 4,560
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3.18 500.1 TRANSFERENCIA Y UNIÓN M3 ### 633,325 651,859 669,363 652,889
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3.19 500.1 TRANSFERENCIA Y UNIÓN M3 ### 665,118 684,482 702,770 685,558
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3.20 500.1 TRANSFERENCIA Y UNIÓN
M3 ### 686,474 706,423 725,265 707,532
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E
3.21 *** INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,005 7,005 7,005 7,005
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 119,495 147,041 178,936 152,840

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 908,150 929,173 949,029 930,341
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 782,354 803,028 822,555 804,177
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 828,541 850,034 870,334 851,228
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 564,008 582,742 600,435 583,782
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 659,944 679,419 697,813 680,501
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 561,229 580,322 598,355 581,383
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ###
i 657,054 676,903 695,651 678,007
p
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ###i 720,260 739,353 757,386 740,414
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ###o 580,488 600,337 619,085 601,441
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 763,988 783,837 802,585 784,941
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 11,820 11,820 11,820 11,820
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO
4.12 650 P B
KG ### 15,135 15,135 15,135 15,135
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,779 1,779 1,779 1,779
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI
4.14 621.1 (INCLUYE REFUERZO Y ANILLOS) ML ### 2,663,527 2,663,527 2,663,527 2,663,527
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE
4.15 621.1 P EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
ML ### 4,102,095 4,138,056 4,172,020 4,140,054
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,710,980 1,729,884 1,747,739 1,730,935
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3)### 86,134 86,134 86,134 86,134
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 357,014 359,283 361,425 359,409
4.19 632 P BARANDA METÁLICA ML ### 419,249 419,249 419,249 419,249
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,741 16,741 16,741 16,741
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 482,887 503,402 547,028 511,922
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 125,417 138,465 155,862 132,666
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 83,829 83,829 120,206 94,900
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 376,609 396,796 415,863 397,917
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 370,160 392,169 415,094 394,944
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 378,803 400,812 423,737 403,587
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 385,227 407,194 430,078 409,966
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 393,870 415,837 438,721 418,609
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 514,251 534,368 553,366 535,485
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 608,438 629,351 649,101 630,512
4.31 681.1 GAVIÓN M3 ### 205,311 231,605 262,051 237,140
4.32 681.1 GAVIÓN MALLA PVC M3 ### 209,412 235,706 266,152 241,242
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 42,081 43,316 44,482 43,384
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 16,205 16,822 17,405 16,857
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25
4.35 *** KN) M2 ### 10,002 10,002 10,002 10,002

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,235 14,235 14,235 14,235
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,138 19,138 19,138 19,138
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA
4.38 *** 100 KN) M2 ### 22,930 22,930 22,930 22,930
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA
4.39 *** 165 KN)
M2 ### 29,450 29,450 29,450 29,450
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y
4.40 *** M2 ###p 7,178 7,178 7,178 7,178
SEPARACIÓN) i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y o
4.41 *** SEPARACIÓN) M2 ### 8,174 8,174 8,174 8,174

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y


4.42 *** SEPARACIÓN) M2 ### 8,494 8,494 8,494 8,494

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,063 6,063 6,063 6,063

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,111 9,111 9,111 9,111

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,437 7,437 7,437 7,437

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,111 9,111 9,111 9,111

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y


4.47 *** SEPARACIÓN) M2 ### 17,465 17,465 17,465 17,465

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE


4.48 661.1 EMBOQUILLADA ML ### 622,267 622,579 622,874 622,596
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 356,874 361,273 365,429 361,518
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 869,987 869,987 869,987 869,987
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 144,873 144,873 182,765 156,405
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,371 4,371 4,371 4,371
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 84,660 84,660 84,660 84,660
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 128,964 128,964 128,964 128,964
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 522,674 543,587 563,337 544,748
4.56 682.1 P COLCHONETA RENO M3 ### 221,162 247,457 277,902 252,992
4.57 *** TRINCHO EN MADERA M2 ### 67,016 67,016 67,016 67,016

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,987 3,987 3,987 3,987
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,946 42,946 42,946 42,946
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 82,585 82,585 82,585 82,585
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 68,720 68,720 68,720 68,720
5.5 730.1 DEFENSA METÁLICA ML ### 145,760 146,615 147,423 146,663
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,409 13,409 13,409 13,409

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 835 835 835 835
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé
i
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE
6.2 801.6 RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM UN ###p 131,984 131,984 131,984 131,984
i
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE
6.3 801.7 ML ###o 25,566 25,566 25,566 25,566
SOBRANTES A UNA DISTANCIA DE 5 KM
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,310 8,310 8,310 8,310
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6.6 801.4 DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,283 15,283 15,283 15,283
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,690 24,690 24,690 24,690
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,420 9,420 9,420 9,420

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
CONSTRUCCIÓN

2,015,993 2,024,961 2,006,029


1,174,189 1,178,673 1,169,207
14,092 14,092 14,092
15,797 15,797 15,797
18,273 18,273 18,273
65,276 65,276 65,276
46,190 46,290 46,079
21,604 21,704 21,493
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
10,480 10,480 10,480
9,803 9,803 9,803
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
900,521 903,709 899,112
10,354 10,354 10,354
3,732 3,732 3,732
2,668,833 2,668,833 2,668,833
247,168 247,168 247,168
9,189 9,189 9,189
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón

98,044 125,458 86,050


216,083 224,206 207,059
297,878 297,878 297,878
207,425 207,425 207,425
22,022 22,022 22,022
665,896 675,632 655,077
670,491 680,694 659,156
624,809 634,362 614,195
49,628 49,628 49,628
153,044 153,044 153,044

190,717 190,717 190,717

236,274 236,274 236,274

297,601 297,601 297,601


106,776 107,482 105,991
132,169 133,192 131,032
610,660 620,213 600,046
91,564 91,564 91,564

38,309 38,359 38,253


196,958 197,009 196,902
472,762 495,205 465,536
230,333 233,203 228,638
265,896 270,545 263,078
353,105 359,323 348,544
104,476 104,695 104,446
1,275,081 1,277,270 1,274,782
116,309 116,867 115,690
73,175 73,469 72,848
28,072 28,225 27,903
44,972 45,125 44,803
59,018 59,232 58,781
80,633 80,877 80,362
111,249 111,462 111,011
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
956,241 958,680 953,531
1,354,276 1,359,154 1,348,857
1,770,652 1,780,407 1,759,814

42,018 42,018 42,018


55,436 55,436 55,436
830,363 839,916 819,749
286,754 301,556 278,339
100,581 101,508 99,550

118,642 119,755 117,405


133,340 134,824 131,691
140,713 142,290 138,961
161,577 163,525 159,413
179,864 182,090 177,390
199,711 202,216 196,929
99,709 99,881 99,518
977,523 987,076 966,909
95,495 95,650 95,323
81,746 82,701 80,685
92,190 93,359 90,892
107,698 109,163 106,070
730,168 739,721 719,554
50,185 50,484 49,853
292,373 296,640 287,633
4,168 4,168 4,168
4,371 4,371 4,371
6,145 6,145 6,145
877,022 886,575 866,408
803,795 814,247 792,181
870,891 880,444 860,277
850,808 860,361 840,194
1,061,241 1,070,794 1,050,627
346,078 356,342 334,675

30,385 30,635 30,108


GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
50,759 51,008 50,481
35,132 35,182 35,076
164,087 164,188 163,975
44,980 45,278 44,648
27,817 27,972 27,645
99,309 99,511 99,085
93,622 94,618 92,516
91,219 91,219 91,219
53,533 53,533 53,533
87,859 87,859 87,859
51,853 51,853 51,853
101,818 101,818 101,818
60,154 60,154 60,154
113,220 113,220 113,220
65,855 65,855 65,855
40,915 41,017 40,803
24,771 24,822 24,715
53,105 53,173 53,030
31,932 31,966 31,894
59,721 59,788 59,646
35,913 35,947 35,876
99,816 100,154 99,440
58,987 59,156 58,799
37,451 37,519 37,376
22,707 22,740 22,669
74,464 74,599 74,313
44,893 44,961 44,818
88,539 88,694 88,367
53,608 53,685 53,522
182,731 183,204 182,205
109,759 109,996 109,497
91,479 91,802 91,121
55,078 55,239 54,899
47,207 47,358 47,038
28,702 28,778 28,618
33,935 34,003 33,860
20,673 20,707 20,636
51,299 51,435 51,149
31,431 31,498 31,355
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
98,780 98,982 98,554
60,138 60,239 60,025
72,116 72,251 71,966
43,539 43,607 43,464
152,055 152,528 151,529
92,418 92,655 92,155
31,862 31,912 31,806
37,691 37,924 37,434
63,194 63,503 62,850
5,245 5,245 5,245
51,120 51,370 50,843
10,601 10,601 10,601
13,964 13,964 13,964
18,235 18,235 18,235
25,455 25,455 25,455
37,859 37,859 37,859
5,107 5,177 5,028

16,138 16,138 16,138


5,872 5,922 5,816
7,058 7,108 7,002
8,331 8,381 8,275
6,816 6,816 6,816
13,681 13,681 13,681
25,556 25,782 25,305
15,372 15,485 15,247
21,442 21,584 21,284
13,005 13,076 12,926
21,665 21,891 21,414
13,116 13,229 12,991
21,442 21,584 21,284
13,005 13,076 12,926
22,479 22,639 22,300
13,522 13,602 13,433
17,819 17,927 17,699
10,905 10,959 10,845
17,989 18,161 17,798
10,990 11,076 10,894
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
22,220 22,362 22,062
13,374 13,445 13,295
22,443 22,669 22,193
13,486 13,598 13,360
18,600 18,772 18,408
11,277 11,363 11,182
23,333 23,559 23,082
14,335 14,447 14,209

27,296 27,499 27,071


84,326 84,824 83,773
55,131 55,131 55,131
22,071 22,071 22,071
34,622 34,622 34,622
80,469 80,469 80,469
63,078 63,078 63,078
36,812 36,812 36,812
84,319 84,319 84,319
100,628 100,628 100,628
147,742 147,742 147,742
58,586 58,586 58,586
81,527 81,527 81,527
74,174 74,174 74,174
131,126 131,126 131,126
76,510 76,510 76,510
56,268 56,268 56,268
32,302 32,302 32,302
59,873 60,126 59,593
46,898 46,898 46,898
43,010 43,010 43,010
36,470 36,470 36,470
35,693 35,693 35,693
35,960 35,960 35,960
50,455 50,455 50,455
44,397 44,397 44,397
81,038 81,038 81,038
149,362 149,362 149,362
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
67,248 67,248 67,248
42,606 42,606 42,606
33,312 33,312 33,312
57,788 57,788 57,788
20,052 20,052 20,052
24,061 24,061 24,061
26,023 26,023 26,023
33,424 33,424 33,424
22,142 22,142 22,142
52,089 52,089 52,089
353,312 353,312 353,312
409,286 409,286 409,286
269,558 269,558 269,558
287,695 287,695 287,695

481,336 491,571 469,963


420,153 429,428 409,848
417,857 427,310 407,354
378,175 388,134 367,110
353,154 363,149 342,050
320,887 330,852 309,816
255,692 262,654 247,957
465,184 471,944 457,673
475,819 486,570 463,873
532,345 542,400 521,173
756,405 766,460 745,233

122,796 122,796 122,796


4,091 4,142 4,035
137,627 137,627 137,627
168,300 168,300 168,300
243,718 243,718 243,718
271,207 271,207 271,207
298,729 298,729 298,729
198,254 198,254 198,254
224,714 224,714 224,714
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
330,554 330,554 330,554
125,488 125,488 125,488
166,501 166,501 166,501
185,023 185,023 185,023
470,794 470,794 470,794
42,032 42,032 42,032
26,305 26,305 26,305
99,389 99,389 99,389
120,518 120,518 120,518
93,661 93,661 93,661
29,151 29,151 29,151
29,151 29,151 29,151
27,643 27,643 27,643
42,322 42,322 42,322
52,344 52,344 52,344
63,033 63,033 63,033
75,728 75,728 75,728
355,850 355,850 355,850
248,951 248,951 248,951
33,636 33,636 33,636
42,990 42,990 42,990
52,344 52,344 52,344
65,706 65,706 65,706

75,909 75,909 75,909


210,280 210,280 210,280
80,503 80,503 80,503
144,547 144,547 144,547
136,338 136,338 136,338
89,523 89,523 89,523
210,728 210,728 210,728
109,917 109,917 109,917
6,603 6,603 6,603
99,771 99,771 99,771
120,590 120,590 120,590
41,066 41,066 41,066
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
535,821 535,821 535,821
192,995 192,995 192,995
217,124 217,124 217,124
488,889 488,889 488,889
128,586 128,586 128,586
390,597 390,597 390,597
6,029 6,029 6,029
275,055 275,055 275,055
122,302 122,302 122,302
85,999 85,999 85,999
88,857 88,857 88,857

10,591 10,591 10,591

11,739 11,739 11,739

9,357 9,357 9,357

221,305 221,305 221,305


266,453 266,453 266,453
22,071 22,071 22,071
34,622 34,622 34,622
33,271 33,271 33,271
42,601 42,601 42,601
87,688 87,688 87,688
222,656 222,656 222,656
44,278 44,278 44,278
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
35,110 35,110 35,110
66,957 66,957 66,957
100,000 100,000 100,000
84,218 84,218 84,218
61,675 61,675 61,675
65,548 65,548 65,548
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
82,818 82,818 82,818
66,593 66,593 66,593
83,122 83,122 83,122
88,849 88,849 88,849
73,422 73,422 73,422
12,464 12,464 12,464
17,509 17,509 17,509
22,869 22,869 22,869
14,151 14,151 14,151
8,470 8,470 8,470
50,842 50,842 50,842
32,555 32,555 32,555
10,595 10,595 10,595
25,184 25,184 25,184
34,910 34,910 34,910
47,354 47,354 47,354
88,309 88,309 88,309
107,435 107,435 107,435
59,925 59,925 59,925
76,224 76,224 76,224
183,905 183,905 183,905
378,886 378,886 378,886
280,079 280,079 280,079
17,580 17,580 17,580
22,178 22,178 22,178
172,471 172,471 172,471
280,413 280,413 280,413
466,395 466,395 466,395
40,332 40,332 40,332
47,544 47,544 47,544
61,145 61,145 61,145
69,198 69,198 69,198

89,146 89,146 89,146

103,501 103,501 103,501


153,176 153,176 153,176
61,809 61,809 61,809
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
62,059 62,059 62,059
39,918 39,918 39,918
49,126 49,126 49,126
4,155 4,155 4,155
6,539 6,539 6,539
1,011,365 1,011,365 1,011,365
773,488 773,488 773,488
2,591,036 2,591,036 2,591,036
2,160,708 2,160,708 2,160,708
629,510 629,510 629,510
813,673 813,673 813,673
312,322 312,322 312,322

362,201 362,201 362,201


57,544 57,544 57,544
68,076 68,076 68,076
75,637 75,637 75,637
89,027 89,027 89,027
54,133 54,133 54,133
61,676 61,676 61,676
142,660 142,660 142,660
55,559 55,559 55,559
127,623 127,623 127,623
76,376 76,376 76,376
45,280 45,280 45,280
95,570 95,570 95,570
408,196 408,196 408,196
543,435 543,435 543,435
3,518 3,518 3,518
4,646 4,646 4,646
7,225 7,225 7,225
12,927 12,927 12,927
271,478 271,478 271,478
76,799 76,799 76,799
103,812 103,812 103,812
42,623 42,623 42,623
1,393,932 1,393,932 1,393,932
1,033,174 1,033,174 1,033,174
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
1,287,382 1,287,382 1,287,382
598,233 598,233 598,233
109,552 109,552 109,552
501,821 501,821 501,821
627,674 627,674 627,674
1,656,913 1,656,913 1,656,913
1,220,321 1,220,321 1,220,321

41,993 42,379 41,563


41,604 41,991 41,175
15,214 15,292 15,128
32,504 33,278 31,645
89,253 90,027 88,394
27,312 27,512 27,090
60,548 61,544 59,441
84,453 86,047 82,683
30,379 30,379 30,379
23,077 23,077 23,077
27,117 27,117 27,117
49,496 50,392 48,500
58,101 59,196 56,883
84,452 86,145 82,571
106,032 112,207 99,171
111,832 125,954 104,677

58,261 58,416 58,089


34,802 34,879 34,716
67,833 68,219 67,403
71,133 71,519 70,703
75,392 75,779 74,963
76,385 76,539 76,213
38,311 38,460 38,144
168,223 168,919 167,450
48,691 49,068 48,273
44,207 44,207 44,207
10,997 11,147 10,830
9,390 9,390 9,390
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
12,595 12,595 12,595
10,590 10,590 10,590
17,675 17,675 17,675
34,345 34,345 34,345
9,334 9,334 9,334
74,755 74,755 74,755
122,364 122,906 121,763
7,647 7,647 7,647
32,530 32,631 32,418
46,006 46,006 46,006
53,421 53,421 53,421
49,497 49,497 49,497
50,685 50,840 50,513
56,736 56,891 56,564
11,056 11,056 11,056
50,166 50,318 49,998
20,681 20,681 20,681
123,591 123,591 123,591
10,054 10,054 10,054
22,600 22,600 22,600
14,553 14,553 14,553
14,143 14,143 14,143
8,652 8,652 8,652
8,802 8,802 8,802
19,169 19,169 19,169
17,483 17,483 17,483
18,654 18,654 18,654
21,565 21,565 21,565
66,336 66,491 66,164
77,514 77,514 77,514
34,603 34,603 34,603
13,350 13,350 13,350
101,663 101,663 101,663
123,182 123,182 123,182

72,849 72,849 72,849


36,321 36,321 36,321
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
55,761 55,761 55,761
68,317 68,317 68,317
51,034 51,034 51,034
94,423 94,423 94,423
48,869 48,869 48,869
104,270 104,270 104,270
13,586 13,586 13,586

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
43,707 43,707 43,707

49,987 49,987 49,987


85,005 85,005 85,005
19,114 19,114 19,114
89,404 127,099 84,264
131,602 139,561 122,759
204,752 239,020 199,612
87,950 115,364 75,956
163,422 214,824 154,855
201,721 235,989 196,581

302,265 302,265 302,265


889,371 889,371 889,371
482,250 482,250 482,250
140,548 140,548 140,548
196,292 196,292 196,292
182,361 182,361 182,361
400,356 400,356 400,356
1,022,652 1,022,652 1,022,652
291,075 291,075 291,075
206,566 206,566 206,566
82,701 82,701 82,701
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón

249,797 249,797 249,797

367,545 367,545 367,545

8,384 8,384 8,384


3,102 3,102 3,102
11,200 11,200 11,200
42,393 42,393 42,393
5,869 5,869 5,869
65,619 65,619 65,619
3,496 3,496 3,496
2,785 2,785 2,785
14,007 14,007 14,007
4,053 4,053 4,053
14,767 14,767 14,767
5,752 5,752 5,752
6,551 6,551 6,551
7,067 7,067 7,067
4,428 4,428 4,428
15,598 15,598 15,598
9,678 9,678 9,678
22,913 22,913 22,913
2,701 2,701 2,701
12,197 12,197 12,197
3,292 3,292 3,292
12,653 12,653 12,653
7,119 7,119 7,119
4,480 4,480 4,480
21,860 21,860 21,860
12,754 12,754 12,754
7,886 7,886 7,886

6,051,426 6,051,426 6,051,426


10,691,949 10,691,949 10,691,949
2,798,192 2,798,192 2,798,192
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
9,144,450 9,144,450 9,144,450
8,563,030 8,563,030 8,563,030
2,701 2,701 2,701
859,259 859,259 859,259
85,789 85,789 85,789
1,554,511 1,554,614 1,554,398
681,802 684,165 679,176

29,398 29,398 29,398


43,637 43,637 43,637
54,087 54,087 54,087
17,661 17,661 17,661
21,385 21,385 21,385
29,143 29,143 29,143
26,161 26,161 26,161
27,578 27,578 27,578
34,470 34,470 34,470
17,633 17,633 17,633
23,103 23,103 23,103
35,517 35,517 35,517
272,093 272,093 272,093
313,122 313,122 313,122
326,613 326,613 326,613
303,126 303,126 303,126

221,275 221,275 221,275


33,884 33,884 33,884
103,401 103,401 103,401
263,382 263,382 263,382
52,056 52,056 52,056
572,510 572,510 572,510
1,417,824 1,417,824 1,417,824
45,112 45,112 45,112
221,224 221,224 221,224
44,080 44,080 44,080
3,761 3,761 3,761
6,305 6,305 6,305
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
18,719 18,719 18,719
24,516 24,516 24,516
31,810 31,810 31,810
122,608 122,608 122,608
31,993 31,993 31,993
104,525 104,525 104,525
184,206 184,206 184,206
288,724 288,724 288,724
358,996 358,996 358,996
392,071 392,071 392,071
575,240 575,240 575,240
339,172 339,172 339,172
103,937 103,937 103,937
13,826 13,826 13,826
28,247 28,247 28,247
5,008 5,008 5,008
35,332 35,332 35,332
36,909 36,909 36,909
37,696 37,696 37,696
24,590 24,590 24,590
27,183 27,183 27,183
28,273 28,273 28,273
47,424 47,424 47,424
612,861 612,861 612,861
315,107 315,107 315,107
88,795 88,795 88,795
1,839 1,839 1,839
8,489 8,489 8,489
12,640 12,640 12,640
21,080 21,080 21,080
3,914 3,914 3,914
22,462 22,462 22,462
32,628 32,628 32,628
19,421 19,421 19,421
15,389 15,389 15,389
617,751 617,751 617,751
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
URBANISMO

9,712 9,712 9,712


90,456 90,456 90,456
508,893 508,893 508,893
1,086,136 1,086,136 1,086,136
124,593 124,593 124,593
758,339 758,339 758,339
1,631,667 1,631,667 1,631,667
13,133 13,133 13,133
16,172 16,172 16,172
20,278 20,278 20,278
22,183 22,183 22,183
26,571 26,571 26,571
26,571 26,571 26,571
106,446 106,446 106,446
123,312 123,312 123,312
381,545 381,545 381,545
143,252 143,252 143,252
236,152 236,152 236,152
1,044,638 1,044,638 1,044,638
1,203,532 1,203,532 1,203,532
14,207 14,207 14,207
12,547 12,547 12,547
30,772 30,772 30,772
122,341 122,341 122,341
182,032 182,032 182,032
29,821 29,821 29,821
102,612 102,612 102,612
151,907 151,907 151,907
30,108 30,108 30,108
62,043 62,043 62,043
249,574 249,574 249,574
72,364 72,364 72,364
290,323 290,323 290,323
174,430 174,430 174,430
495,464 495,464 495,464
1,325,851 1,325,851 1,325,851
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
1,959,039 1,959,039 1,959,039

10,785 10,785 10,785


24,666 24,666 24,666
19,114 19,114 19,114
77,628 82,763 71,922
84,370 122,065 79,230
93,010 120,424 81,016
107,361 117,609 99,162
104,081 124,976 100,947
107,425 113,984 100,139

113,784 113,784 113,784


1,185,562 1,185,562 1,185,562
148,671 148,671 148,671
1,373,165 1,373,165 1,373,165
957,145 957,145 957,145
62,545 62,545 62,545
112,953 112,953 112,953
266,630 266,630 266,630
266,623 266,623 266,623
428,017 428,017 428,017
113,001 113,001 113,001
113,001 113,001 113,001
266,630 266,630 266,630
266,630 266,630 266,630
428,017 428,017 428,017
430,588 430,588 430,588
698,576 698,576 698,576
1,120,970 1,120,970 1,120,970
69,283 69,283 69,283
360,469 360,469 360,469
403,378 403,378 403,378
1,116,855 1,116,855 1,116,855
65,503 65,571 65,428
326,867 326,867 326,867
49,684 49,684 49,684
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
70,234 70,234 70,234
101,316 101,316 101,316
155,506 155,506 155,506
249,851 249,851 249,851
362,989 362,989 362,989
459,213 459,213 459,213
603,739 603,739 603,739
830,148 830,148 830,148

680,536 686,208 674,234


672,962 677,889 667,488

718,460 722,242 714,259


808,780 815,870 800,903
954,361 961,299 946,653

831,406 836,605 825,629


1,000,263 1,003,116 997,097
1,460,932 1,469,130 1,451,832
2,004,125 2,019,337 1,987,224
2,677,008 2,702,295 2,648,914
1,819,462 1,819,462 1,819,462
3,845,704 3,845,704 3,845,704
139,265 139,466 139,042

73,522 73,876 73,130


86,886 87,240 86,494
58,673 59,719 57,511
62,840 63,832 61,737
63,081 64,055 61,999
252,401 252,602 252,178
18,751 18,877 18,612
41,971 42,708 41,152
83,373 83,480 83,253
562,218 564,618 559,552
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
64,627 65,088 64,116
92,428 92,888 91,917
34,253 34,650 33,812
55,489 56,293 54,597
103,478 107,566 102,762
61,316 61,595 61,007

202,421 202,894 201,896


661,460 662,122 660,725
213,124 213,224 213,013
162,180 162,747 161,550
164,048 164,615 163,418
192,061 192,661 191,395
59,042 59,313 58,742
67,979 68,282 67,643
308,648 308,715 308,572
814,558 814,841 814,243
3,336,713 3,336,902 3,336,503
3,432,477 3,432,666 3,432,267
480,549 480,749 480,327
638,117 638,916 637,228
528,344 528,344 528,344
246,341 246,625 246,026
568,855 569,024 568,668
6,345,630 6,347,048 6,344,055

3,987 3,987 3,987


42,946 42,946 42,946
310,529 310,629 310,417
489,794 490,194 489,350
233,157 233,257 233,045
247,525 247,625 247,413
258,405 258,505 258,293
13,409 13,409 13,409
14,317 14,317 14,317
116,349 116,349 116,349
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
SPECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548


35,190 35,190 35,190
8,749 8,749 8,749
14,967 14,967 14,967
13,068 13,068 13,068
7,499 7,499 7,499
481 481 481
12,832 12,832 12,832

20,948 20,948 20,948

64,804 64,804 64,804

79,577 79,577 79,577

19,035 19,035 19,035

39,738 39,738 39,738

31,203 31,203 31,203

53,644 53,644 53,644


GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón

5,366 5,366 5,366


163,422 214,824 154,855
201,721 235,989 196,581
139,125 139,125 139,125
3,182 3,182 3,182
1,111 1,111 1,111
222,112 223,605 220,452
68,992 69,672 68,236
651,139 684,089 646,197
660,064 693,014 655,122
696,447 729,397 691,504
713,614 746,564 708,672
364,933 384,545 323,573
347,360 381,628 342,220
308,017 359,419 299,450
38,019 38,019 38,019
168,435 168,435 168,435
87,950 115,364 75,956
11,435 11,533 11,327
4,582 4,631 4,528
657,007 666,275 646,711

689,861 699,543 679,103

711,965 721,940 700,882

7,005 7,005 7,005


148,491 177,487 144,141

935,013 945,525 923,333


808,771 819,109 797,284
856,005 866,751 844,063
587,945 597,313 577,537
684,829 694,567 674,008
585,626 595,174 575,018
GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón
682,418 692,344 671,390
744,657 754,205 734,049
605,852 615,777 594,824
789,352 799,277 778,324
11,820 11,820 11,820
15,135 15,135 15,135
1,779 1,779 1,779
2,663,527 2,663,527 2,663,527

4,148,045 4,166,027 4,128,067


1,735,136 1,744,589 1,724,633
86,134 86,134 86,134
359,913 361,047 358,653
419,249 419,249 419,249
16,741 16,741 16,741
516,481 543,609 497,703
132,666 147,164 121,067
88,574 123,369 83,829
402,404 412,499 391,189
396,028 412,569 387,784
404,671 421,212 396,427
411,040 427,560 402,820
419,683 436,203 411,463
539,955 550,013 528,779
635,159 645,616 623,541
232,989 260,667 228,837
237,090 264,768 232,938
43,659 44,276 42,973
16,994 17,303 16,651
10,002 10,002 10,002

14,235 14,235 14,235


19,138 19,138 19,138
22,930 22,930 22,930

29,450 29,450 29,450


GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón

7,178 7,178 7,178

8,174 8,174 8,174

8,494 8,494 8,494

6,063 6,063 6,063

9,111 9,111 9,111

7,437 7,437 7,437

9,111 9,111 9,111

17,465 17,465 17,465

622,666 622,822 622,492


362,495 364,696 360,051
869,987 869,987 869,987
156,405 182,765 144,873
4,371 4,371 4,371
84,660 84,660 84,660
128,964 128,964 128,964
549,395 559,852 537,777
248,840 276,518 244,689
67,016 67,016 67,016

3,987 3,987 3,987


42,946 42,946 42,946
82,585 82,585 82,585
68,720 68,720 68,720
146,853 147,281 146,378
13,409 13,409 13,409

835 835 835


GOBERNACIÓN DE CUNDINAMARCA
IOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALMEIDAS
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Suesca Tiribita V.Pinzón

131,984 131,984 131,984

25,566 25,566 25,566


8,310 8,310 8,310
448,890 448,890 448,890
1,804 1,804 1,804
15,283 15,283 15,283
24,690 24,690 24,690
9,420 9,420 9,420

APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,993,293 1,977,624 2,002,067 2,011,083 1,992,039
1.2 CAMPAMENTO 9 M2 UN ### 1,163,807 1,155,972 1,168,194 1,172,701 1,163,180
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,201 14,201 14,201 14,201 14,201
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,920 15,920 15,920 15,920 15,920
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,409 18,409 18,409 18,409 18,409
1.6 CERCA EN TABLA H=2.30 M ML ### 66,135 66,135 66,135 66,135 66,135
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,230 46,063 46,324 46,417 46,217
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,294 21,127 21,388 21,481 21,281
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 908,192 905,626 909,725 911,853 907,860
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,478 10,478 10,478 10,478 10,478
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,782 3,782 3,782 3,782 3,782
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,707,298 2,707,298 2,707,298 2,707,298 2,707,298
1.44 RED TELEFÓNICA PROVISIONAL UN ### 250,360 250,360 250,360 250,360 250,360
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 83,359 67,938 93,639 114,200 71,365
2.2 BASE ARENA CEMENTO 1:20 M3 ### 186,539 170,523 195,509 202,556 185,258
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,313 22,313 22,313 22,313 22,313
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 620,507 604,010 629,744 639,043 619,187
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 620,878 603,916 630,375 639,810 619,520
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 578,064 562,181 586,957 595,791 576,793
2.9 PILOTE DE MADERA D=20 CM ML ### 49,774 49,774 49,774 49,774 49,774
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM) ML ### 153,516 153,516 153,516 153,516 153,516
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 DISTANCIA MENOR DE 5 KM) ML ### 191,768 191,768 191,768 191,768 191,768
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 DISTANCIA MENOR DE 5 KM) ML ### 238,026 238,026 238,026 238,026 238,026
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 DISTANCIA MENOR DE 5 KM) ML ### 300,296 300,296 300,296 300,296 300,296
2.14 PILOTE HINCADO 25X25 ML ### 103,494 102,351 104,134 104,757 103,403
2.15 PILOTE HINCADO 30X30 ML ### 127,413 125,756 128,340 129,244 127,280
2.16 DADOS EN CONCRETO 3500PSI M3 ### 563,915 548,032 572,808 581,642 562,644
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.17 DE 5 KM) ML ### 91,875 91,875 91,875 91,875 91,875

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 38,529 38,430 38,585 38,629 38,521
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
3.2 SIFÓN EN PVC 6" UN ###
i 199,673 199,574 199,729 199,773 199,665
p
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### i 457,456 443,244 466,207 479,100 455,261
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### o 225,303 222,502 226,939 228,731 224,990
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 256,137 251,551 258,809 261,707 255,630
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 335,371 328,266 339,454 343,460 334,662
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 105,023 104,933 105,082 105,202 105,003
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,295,014 1,294,118 1,295,611 1,296,805 1,294,815
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 115,336 114,237 115,952 116,435 115,248
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 72,921 72,341 73,246 73,501 72,875
3.11 TUBERÍA DRENAJE PVC 110 ML ### 27,817 27,506 27,991 28,137 27,792
3.12 TUBERÍA DRENAJE PVC 160 ML ### 44,976 44,665 45,150 45,295 44,951
3.13 TUBERÍA DRENAJE PVC 200 ML ### 59,006 58,571 59,250 59,454 58,971
3.14 TUBERÍA DRENAJE PVC 250 ML ### 80,848 80,351 81,127 81,360 80,809
3.15 TUBERÍA DRENAJE PVC 315 ML ### 112,078 111,643 112,322 112,526 112,044

3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 961,363 956,388 964,148 966,480 960,965

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3.17 FILTRANTE) UN ### 1,356,910 1,346,961 1,362,480 1,367,144 1,356,114

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL


3.18 FILTRANTE) UN ### 1,762,096 1,742,199 1,773,237 1,782,564 1,760,504

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,554 42,554 42,554 42,554 42,554
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 56,192 56,192 56,192 56,192 56,192
4.3 COLUMNAS 3500 PSI M3 ### 785,155 769,273 794,048 802,883 783,884
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 247,353 233,352 247,236 254,667 244,862
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI M2 ### 96,721 95,179 97,584 98,442 96,597
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4.6 REFUERZO, CONCRETO DE 3500 PSI
M2 ### 114,027 112,176 115,063 116,092 113,879
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 126,389 123,922 127,771 129,143 126,192
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 133,326 130,705 134,794 136,252 133,116
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 152,396 149,158 154,210 156,011 152,137
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 169,349 165,648 171,421 173,480 169,053
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 187,857 183,694 190,188 192,504 187,524
4.12 ENTREPISO VIGUETA PLACA M2 ### 99,914 99,639 100,068 100,209 99,892
4.13 ESCALERA MACIZA 3500 PSI M3 ### 934,298 918,416 943,191 952,026 933,027
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ###
i 95,655 95,456 95,766 95,854 95,639
p
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### i 77,254 75,666 78,143 79,027 77,127
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### o 86,648 84,705 87,736 88,817 86,493
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 100,696 98,260 102,060 103,415 100,501
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 683,910 668,027 692,803 701,637 682,639
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,795 48,311 49,065 49,329 48,756
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 271,493 264,400 275,465 279,410 270,925
4.21 ACERO FIGURADO 37000 PSI KG ### 4,226 4,226 4,226 4,226 4,226
4.22 ACERO FIGURADO 60000 PSI KG ### 4,432 4,432 4,432 4,432 4,432
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,208 6,208 6,208 6,208 6,208
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 831,169 815,287 840,062 848,896 829,898
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 752,942 735,555 762,677 772,352 751,551
4.26 VIGA AÉREA 3500 PSI M3 ### 825,234 809,352 834,127 842,962 823,963
4.27 VIGA CINTA 3500 PSI M3 ### 805,159 789,276 814,052 822,886 803,888
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,015,746 999,863 1,024,639 1,033,473 1,014,475
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 297,843 279,910 307,884 318,202 296,408

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,215 28,793 29,451 29,670 29,181
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,608 49,186 49,844 50,064 49,574
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,184 35,085 35,240 35,284 35,176
5.4 ARCOS EN LADRILLO PRENSADO ML ### 164,849 164,650 164,960 165,048 164,833
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,578 43,095 43,849 44,112 43,539
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,900 26,701 27,012 27,099 26,884
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 99,808 99,410 100,031 100,206 99,776
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 88,921 87,309 89,823 90,702 88,792
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 92,176 92,176 92,176 92,176 92,176
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 54,012 54,012 54,012 54,012 54,012
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 88,761 88,761 88,761 88,761 88,761
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,304 52,304 52,304 52,304 52,304
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 102,987 102,987 102,987 102,987 102,987
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,738 60,738 60,738 60,738 60,738
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 114,574 114,574 114,574 114,574 114,574
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,532 66,532 66,532 66,532 66,532
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 40,926 40,726 41,038 41,126 40,910
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,777 24,677 24,833 24,877 24,769
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 53,463 53,329 53,537 53,596 53,452
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ###
i 32,111 32,044 32,148 32,177 32,105
p
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### i 60,158 60,025 60,233 60,291 60,147
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### o 36,132 36,065 36,169 36,198 36,126
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 99,613 98,946 99,986 100,280 99,560
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,886 58,552 59,072 59,219 58,859
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,547 37,414 37,622 37,681 37,537
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,754 22,688 22,792 22,821 22,749
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 74,731 74,464 74,880 74,997 74,710
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,027 44,893 45,101 45,160 45,016
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 88,533 88,334 88,644 88,732 88,517
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,605 53,505 53,661 53,704 53,597
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 183,281 182,348 183,804 184,214 183,206
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 110,034 109,568 110,296 110,501 109,997
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 90,585 90,106 90,854 91,065 90,547
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,631 54,391 54,765 54,871 54,612
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 47,123 46,825 47,290 47,421 47,099
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,660 28,511 28,744 28,809 28,648
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,998 33,864 34,072 34,131 33,987
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,705 20,638 20,742 20,771 20,699
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 51,369 51,102 51,518 51,635 51,347
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,465 31,332 31,540 31,599 31,455
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 99,203 98,803 99,427 99,603 99,171
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,350 60,150 60,462 60,550 60,334
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 72,393 72,127 72,543 72,660 72,372
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,687 43,554 43,762 43,821 43,677
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 151,972 151,039 152,494 152,905 151,897
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 92,390 91,924 92,652 92,857 92,353
5.47 REMATES LADRILLO PRENSADO ML ### 31,973 31,873 32,029 32,072 31,965
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,591 36,246 36,785 36,937 36,564
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,849 61,389 62,107 62,310 61,813
5.50 LAVADA DE FACHADA M2 ### 5,255 5,255 5,255 5,255 5,255
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,971 49,549 50,207 50,427 49,937
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,620 10,620 10,620 10,620 10,620
5.53 ANCLAJE 3/8" L=30CM UN ### 14,022 14,022 14,022 14,022 14,022
5.54 ANCLAJE 1/2" L=50CM UN ### 18,321 18,321 18,321 18,321 18,321
5.55 ANCLAJE 5/8" L=70CM UN ### 25,630 25,630 25,630 25,630 25,630
5.56 ANCLAJE 3/4" L=70CM UN ### 38,195 38,195 38,195 38,195 38,195
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
5.57 ANCLAJE 1" L= 70CM UN ###
i 4,769 4,649 4,835 4,903 4,759
p
i
6 PAÑETES, REVOQUES Y REPELLOS o
6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,191 16,191 16,191 16,191 16,191
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,696 5,597 5,752 5,796 5,688
6.3 FILOS O DILATACIONES S/MURO ML ### 6,882 6,783 6,938 6,982 6,874
6.4 GOTERA EN MORTERO 1:4 ML ### 8,170 8,071 8,226 8,270 8,162
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,889 6,889 6,889 6,889 6,889
6.6 MALLA BAJO ENTRAMADO M2 ### 13,752 13,752 13,752 13,752 13,752
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,228 23,892 24,416 24,564 24,201
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,708 14,540 14,802 14,876 14,695
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 20,995 20,715 21,152 21,275 20,973
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,781 12,641 12,860 12,921 12,770
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 20,337 20,001 20,525 20,673 20,310
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,452 12,285 12,546 12,620 12,439
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 20,995 20,715 21,152 21,275 20,973
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,781 12,641 12,860 12,921 12,770
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 21,612 21,372 21,746 21,851 21,592
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,089 12,969 13,156 13,208 13,079
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,478 17,265 17,598 17,692 17,461
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,735 10,628 10,794 10,841 10,726
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,977 16,721 17,121 17,233 16,957
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,484 10,356 10,556 10,612 10,474
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 21,773 21,493 21,930 22,053 21,751
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,150 13,010 13,229 13,290 13,139
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,115 20,780 21,303 21,451 21,089
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,822 12,654 12,916 12,989 12,808
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,588 17,332 17,731 17,843 17,567
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,771 10,643 10,843 10,899 10,761
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,005 21,669 22,193 22,341 21,978
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,671 13,503 13,765 13,838 13,657

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 26,658 26,258 26,882 27,058 26,626
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE) M2 ### 82,471 81,665 82,922 83,361 82,406
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,863 55,863 55,863 55,863 55,863
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ###
i 22,299 22,299 22,299 22,299 22,299
p
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### i 35,002 35,002 35,002 35,002 35,002
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### o 81,595 81,595 81,595 81,595 81,595
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,918 63,918 63,918 63,918 63,918
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,223 37,223 37,223 37,223 37,223
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 85,508 85,508 85,508 85,508 85,508
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 102,083 102,083 102,083 102,083 102,083
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 149,969 149,969 149,969 149,969 149,969
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 59,325 59,325 59,325 59,325 59,325
7.13 CANAL PVC AMAZONAS ML ### 82,483 82,483 82,483 82,483 82,483
7.14 CANAL PVC RAINGO ML ### 75,008 75,008 75,008 75,008 75,008
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 132,933 132,933 132,933 132,933 132,933
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 77,610 77,610 77,610 77,610 77,610
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 57,036 57,036 57,036 57,036 57,036
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,586 32,586 32,586 32,586 32,586
7.19 TEJA DE BARRO M2 ### 59,396 58,898 59,674 59,893 59,356
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 47,543 47,543 47,543 47,543 47,543
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,592 43,592 43,592 43,592 43,592
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,848 36,848 36,848 36,848 36,848
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 36,073 36,073 36,073 36,073 36,073
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 36,343 36,343 36,343 36,343 36,343
7.25 TEJA TERMOACÚSTICA M2 ### 51,090 51,090 51,090 51,090 51,090
7.26 TEJA PLÁSTICA No.6 M2 ### 44,933 44,933 44,933 44,933 44,933
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 82,144 82,144 82,144 82,144 82,144
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 151,567 151,567 151,567 151,567 151,567
7.29 TEJA SIN TRASLAPO M2 ### 68,178 68,178 68,178 68,178 68,178
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,921 42,921 42,921 42,921 42,921
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,602 33,602 33,602 33,602 33,602
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM)
M2 ### 58,479 58,479 58,479 58,479 58,479
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,187 20,187 20,187 20,187 20,187
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,262 24,262 24,262 24,262 24,262
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,271 26,271 26,271 26,271 26,271
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,795 33,795 33,795 33,795 33,795
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,338 22,338 22,338 22,338 22,338
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,574 52,574 52,574 52,574 52,574
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 358,894 358,894 358,894 358,894 358,894
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ###
i 412,206 412,206 412,206 412,206 412,206
p
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### i 273,114 273,114 273,114 273,114 273,114
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### o 291,690 291,690 291,690 291,690 291,690

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 429,045 412,481 438,320 447,353 427,720
8.2 CONCRETO 3500 PSI M3 ### 374,515 359,095 383,149 391,726 373,281
8.3 CONCRETO 3000 PSI M3 ### 372,561 356,544 381,529 390,557 371,279
8.4 CONCRETO 2500 PSI M3 ### 325,857 309,740 334,881 343,670 324,567
8.5 CONCRETO 2000 PSI M3 ### 302,933 286,220 312,292 321,626 301,596
8.6 CONCRETO 1500 PSI M3 ### 274,057 256,647 283,806 293,823 272,664
8.7 MORTERO SECO 1:10 M3 ### 231,178 217,450 238,866 244,907 230,080
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 443,899 430,568 451,364 457,229 442,832
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 412,579 396,590 421,533 428,568 411,300
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 474,483 459,529 482,857 489,437 473,287
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 702,223 687,269 710,597 717,177 701,027

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 124,282 124,282 124,282 124,282 124,282
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,931 3,832 3,987 4,031 3,923
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 139,146 139,146 139,146 139,146 139,146
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 170,321 170,321 170,321 170,321 170,321
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 247,268 247,268 247,268 247,268 247,268
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 275,197 275,197 275,197 275,197 275,197
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 303,158 303,158 303,158 303,158 303,158
9.8 HOJA PUERTA FORTEC 0.81 UN ### 201,285 201,285 201,285 201,285 201,285
9.9 HOJA PUERTA FORTEC 0.91 UN ### 228,179 228,179 228,179 228,179 228,179
9.10 HOJA PUERTA FORTEC 1.50 UN ### 335,752 335,752 335,752 335,752 335,752
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 127,329 127,329 127,329 127,329 127,329
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 169,013 169,013 169,013 169,013 169,013
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 187,839 187,839 187,839 187,839 187,839
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 478,287 478,287 478,287 478,287 478,287
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,490 42,490 42,490 42,490 42,490
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,506 26,506 26,506 26,506 26,506
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 100,459 100,459 100,459 100,459 100,459
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 122,380 122,380 122,380 122,380 122,380
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 95,083 95,083 95,083 95,083 95,083
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ###
i 29,517 29,517 29,517 29,517 29,517
p
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### i 29,517 29,517 29,517 29,517 29,517
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### o 27,984 27,984 27,984 27,984 27,984
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,814 42,814 42,814 42,814 42,814
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 53,000 53,000 53,000 53,000 53,000
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,865 63,865 63,865 63,865 63,865
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 76,767 76,767 76,767 76,767 76,767
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 361,318 361,318 361,318 361,318 361,318
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 252,669 252,669 252,669 252,669 252,669
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,987 33,987 33,987 33,987 33,987
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 43,493 43,493 43,493 43,493 43,493
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 53,000 53,000 53,000 53,000 53,000
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 66,582 66,582 66,582 66,582 66,582

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 76,784 76,784 76,784 76,784 76,784
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 213,355 213,355 213,355 213,355 213,355
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO) ML ### 81,329 81,329 81,329 81,329 81,329
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 145,691 145,691 145,691 145,691 145,691
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 137,835 137,835 137,835 137,835 137,835
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 90,498 90,498 90,498 90,498 90,498
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 213,212 213,212 213,212 213,212 213,212
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 111,105 111,105 111,105 111,105 111,105
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,668 6,668 6,668 6,668 6,668
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 100,487 100,487 100,487 100,487 100,487
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 122,087 122,087 122,087 122,087 122,087
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,371 41,371 41,371 41,371 41,371
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 543,925 543,925 543,925 543,925 543,925
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 195,695 195,695 195,695 195,695 195,695
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 219,759 219,759 219,759 219,759 219,759
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS)
M2 ### 496,035 496,035 496,035 496,035 496,035
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 129,642 129,642 129,642 129,642 129,642
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 396,624 396,624 396,624 396,624 396,624
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,091 6,091 6,091 6,091 6,091
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 279,033 279,033 279,033 279,033 279,033
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ###
i 123,388 123,388 123,388 123,388 123,388
p
10.21 REJILLA PISO 0.30 M M2 ### i 87,020 87,020 87,020 87,020 87,020
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### o 89,853 89,853 89,853 89,853 89,853
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,674 10,674 10,674 10,674 10,674
SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE,
10.24 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,840 11,840 11,840 11,840 11,840
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS,
10.25 VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA
KG ### 9,418 9,418 9,418 9,418 9,418
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 223,165 223,165 223,165 223,165 223,165
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 269,046 269,046 269,046 269,046 269,046
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,299 22,299 22,299 22,299 22,299
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,002 35,002 35,002 35,002 35,002
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,594 33,594 33,594 33,594 33,594
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 43,056 43,056 43,056 43,056 43,056
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 88,731 88,731 88,731 88,731 88,731
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 224,533 224,533 224,533 224,533 224,533
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,297 44,297 44,297 44,297 44,297
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 35,390 35,390 35,390 35,390 35,390
11.13 NIPLE PASAMURO 2" UN ### 67,347 67,347 67,347 67,347 67,347
11.14 NIPLE PASAMURO 4" UN ### 100,628 100,628 100,628 100,628 100,628
11.15 PUNTO AGUA CALIENTE CPVC UN ### 84,890 84,890 84,890 84,890 84,890
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 61,979 61,979 61,979 61,979 61,979
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 65,912 65,912 65,912 65,912 65,912
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 83,289 83,289 83,289 83,289 83,289
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 67,095 67,095 67,095 67,095 67,095
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 83,895 83,895 83,895 83,895 83,895
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 89,715 89,715 89,715 89,715 89,715
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 74,303 74,303 74,303 74,303 74,303
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
11.23 RED SUMINISTRO CPVC 1/2" ML ###
i 12,598 12,598 12,598 12,598 12,598
p
11.24 RED SUMINISTRO CPVC 3/4" ML ### i 17,724 17,724 17,724 17,724 17,724
11.25 RED SUMINISTRO PVC 1 1/2" ML ### o 23,145 23,145 23,145 23,145 23,145
11.26 RED SUMINISTRO PVC 1" ML ### 14,303 14,303 14,303 14,303 14,303
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,550 8,550 8,550 8,550 8,550
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 51,528 51,528 51,528 51,528 51,528
11.29 RED SUMINISTRO PVC 2" ML ### 32,971 32,971 32,971 32,971 32,971
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,703 10,703 10,703 10,703 10,703
11.31 RED SANITARIA PVC-S 2" ML ### 25,479 25,479 25,479 25,479 25,479
11.32 RED SANITARIA PVC-S 3" ML ### 35,340 35,340 35,340 35,340 35,340
11.33 RED SANITARIA PVC-S 4" ML ### 47,953 47,953 47,953 47,953 47,953
11.34 RED SANITARIA PVC-S 6" ML ### 89,578 89,578 89,578 89,578 89,578
11.35 REGISTRO 1" UN ### 108,841 108,841 108,841 108,841 108,841
11.36 REGISTRO 1/2" UN ### 60,686 60,686 60,686 60,686 60,686
11.37 REGISTRO 3/4" UN ### 77,251 77,251 77,251 77,251 77,251
11.38 REGISTRO 1 1/2" UN ### 186,563 186,563 186,563 186,563 186,563
11.39 REGISTRO 2 1/2" UN ### 384,647 384,647 384,647 384,647 384,647
11.40 REGISTRO 2" UN ### 284,222 284,222 284,222 284,222 284,222
11.41 REVENTILACIÓN 2" ML ### 17,770 17,770 17,770 17,770 17,770
11.42 REVENTILACIÓN 3" ML ### 22,424 22,424 22,424 22,424 22,424
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 174,411 174,411 174,411 174,411 174,411
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 283,826 283,826 283,826 283,826 283,826
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 472,264 472,264 472,264 472,264 472,264
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 40,840 40,840 40,840 40,840 40,840

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.47 SOPORTES) ML ### 48,155 48,155 48,155 48,155 48,155

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 61,822 61,822 61,822 61,822 61,822

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.49 SOPORTES) ML ### 70,070 70,070 70,070 70,070 70,070

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.50 SOPORTES) ML ### 90,289 90,289 90,289 90,289 90,289

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y


11.51 SOPORTES)
ML ### 104,617 104,617 104,617 104,617 104,617

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y


11.52 SOPORTES) ML ### 154,745 154,745 154,745 154,745 154,745
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ###
i 62,372 62,372 62,372 62,372 62,372
p
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### i 62,626 62,626 62,626 62,626 62,626
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### o 40,362 40,362 40,362 40,362 40,362
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 49,721 49,721 49,721 49,721 49,721
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,211 4,211 4,211 4,211 4,211
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,634 6,634 6,634 6,634 6,634
11.59 GABINETE TIPO III UN ### 1,025,183 1,025,183 1,025,183 1,025,183 1,025,183
11.60 GABINETE TIPO I UN ### 783,412 783,412 783,412 783,412 783,412
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,631,198 2,631,198 2,631,198 2,631,198 2,631,198
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,193,826 2,193,826 2,193,826 2,193,826 2,193,826
11.63 VÁLVULA MARIPOSA 3" UN ### 637,549 637,549 637,549 637,549 637,549
11.64 VÁLVULA MARIPOSA 4" UN ### 824,726 824,726 824,726 824,726 824,726
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 317,246 317,246 317,246 317,246 317,246

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 367,044 367,044 367,044 367,044 367,044
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 58,317 58,317 58,317 58,317 58,317
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 69,019 69,019 69,019 69,019 69,019
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 76,646 76,646 76,646 76,646 76,646
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 90,253 90,253 90,253 90,253 90,253
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,846 54,846 54,846 54,846 54,846
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 62,500 62,500 62,500 62,500 62,500
12.8 STRIP TELEFÓNICO 10 PARES UN ### 144,362 144,362 144,362 144,362 144,362
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 56,300 56,300 56,300 56,300 56,300
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 129,368 129,368 129,368 129,368 129,368
12.11 SALIDA T.V PVC COMPLETA. UN ### 77,389 77,389 77,389 77,389 77,389
12.12 SALIDA BIFÁSICA C.N. UN ### 45,884 45,884 45,884 45,884 45,884
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 96,752 96,752 96,752 96,752 96,752
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 413,152 413,152 413,152 413,152 413,152
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 550,227 550,227 550,227 550,227 550,227
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,563 3,563 3,563 3,563 3,563
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,704 4,704 4,704 4,704 4,704
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,318 7,318 7,318 7,318 7,318
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,091 13,091 13,091 13,091 13,091
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 275,025 275,025 275,025 275,025 275,025
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 77,735 77,735 77,735 77,735 77,735
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 105,191 105,191 105,191 105,191 105,191
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ###
i 43,000 43,000 43,000 43,000 43,000
p
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### i 1,410,512 1,410,512 1,410,512 1,410,512 1,410,512
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### o 1,045,355 1,045,355 1,045,355 1,045,355 1,045,355
12.26 POSTE METÁLICO 6M UN ### 1,305,919 1,305,919 1,305,919 1,305,919 1,305,919
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 607,437 607,437 607,437 607,437 607,437
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 110,992 110,992 110,992 110,992 110,992
12.29 LUMINARIA 70W SODIO UN ### 509,614 509,614 509,614 509,614 509,614
12.30 LUMINARIA 150W SODIO UN ### 637,527 637,527 637,527 637,527 637,527
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,683,597 1,683,597 1,683,597 1,683,597 1,683,597
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,239,857 1,239,857 1,239,857 1,239,857 1,239,857

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 39,912 39,337 40,235 40,488 39,866
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,612 39,037 39,934 40,187 39,566
13.3 ALISTADO PARA LISTÓN M2 ### 14,811 14,696 14,875 14,926 14,802
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 27,885 26,735 28,529 29,035 27,793
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 85,480 84,329 86,124 86,630 85,388
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,333 25,999 26,520 26,707 26,306
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 55,352 53,740 56,254 57,133 55,223
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 76,137 73,559 77,581 78,988 75,931
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,738 30,738 30,738 30,738 30,738
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,264 23,264 23,264 23,264 23,264
13.11 PERMA PLY 2 CAPAS M2 ### 27,311 27,311 27,311 27,311 27,311
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 44,805 43,354 45,617 46,408 44,689
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 52,363 50,591 53,356 54,323 52,222
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 75,594 72,854 77,128 78,622 75,374
13.15 TRITURADO FINO 1/2 M3 ### 88,892 75,443 96,423 102,342 87,817
13.16 TRITURADO GRUESO 3/4 M3 ### 95,863 81,338 104,379 114,284 94,192

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,889 57,659 58,018 58,119 57,871
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,616 34,501 34,681 34,732 34,607
14.3 ADOQUÍN CONCRETO 6CM M2 ### 66,026 65,451 66,348 66,601 65,980
14.4 ADOQUÍN CONCRETO 8CM M2 ### 69,426 68,851 69,748 70,001 69,380
14.5 ADOQUÍN GRES PEATONAL M2 ### 73,730 73,155 74,052 74,305 73,684
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO M2 ### 76,328 76,098 76,457 76,558 76,310
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
14.7 GRAVILLA PARA GRADAS ML ###
i 37,513 37,271 37,649 37,755 37,494
p
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### i 165,900 164,865 166,480 166,936 165,818
14.9 ACABADO EN GRAVILLA LAVADA M2 ### o 46,639 46,040 46,975 47,239 46,591
14.10 GUARDAESCOBA EN GRANITO ML ### 44,472 44,472 44,472 44,472 44,472
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,170 9,928 10,306 10,412 10,150
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,522 9,522 9,522 9,522 9,522
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,780 12,780 12,780 12,780 12,780
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,689 10,689 10,689 10,689 10,689
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,890 17,890 17,890 17,890 17,890
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,832 34,832 34,832 34,832 34,832
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,364 9,364 9,364 9,364 9,364
14.18 LISTÓN M.H. AMARILLO M2 ### 75,520 75,520 75,520 75,520 75,520
14.19 PASO ESCALERA GRANITO ML ### 120,018 119,212 120,468 120,823 119,953
14.20 PIRLANES ALUMINIO ML ### 7,659 7,659 7,659 7,659 7,659
14.21 PIRLANES LADRILLO ML ### 32,338 32,139 32,449 32,537 32,322
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 46,591 46,591 46,591 46,591 46,591
14.23 PISO VINILO TRÁFICO PESADO M2 ### 54,136 54,136 54,136 54,136 54,136
14.24 PULIDA LACADA PISO MADERA M2 ### 49,938 49,938 49,938 49,938 49,938
14.25 TABLETA DE GRES 25X25 M2 ### 50,209 49,979 50,338 50,439 50,191
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,358 56,128 56,487 56,588 56,340
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,115 11,115 11,115 11,115 11,115
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 50,069 49,771 50,237 50,368 50,046
14.29 JABONERA PORCELANA ACUARIO UN ### 20,932 20,932 20,932 20,932 20,932
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y
14.30 PERCHA SIMPLE) UN ### 125,232 125,232 125,232 125,232 125,232
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,105 10,105 10,105 10,105 10,105
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,855 22,855 22,855 22,855 22,855
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,677 14,677 14,677 14,677 14,677
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,260 14,260 14,260 14,260 14,260
14.35 REMATES BOCEL ALUMINIO ML ### 8,685 8,685 8,685 8,685 8,685
14.36 REMATES BOCEL PORCELANA ML ### 8,837 8,837 8,837 8,837 8,837
14.37 TAPA REGISTRO 20X20 UN ### 19,368 19,368 19,368 19,368 19,368
14.38 TAPA REGISTRO 6X6 UN ### 17,654 17,654 17,654 17,654 17,654
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,960 18,960 18,960 18,960 18,960
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN
14.40 SITIO M2 ### 21,918 21,918 21,918 21,918 21,918
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 66,167 65,937 66,296 66,397 66,148
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
14.42 MEDIA CAÑA EN GRANITO ML ###
i 78,660 78,660 78,660 78,660 78,660
p
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### i 34,660 34,660 34,660 34,660 34,660
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### o 13,480 13,480 13,480 13,480 13,480
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 103,289 103,289 103,289 103,289 103,289
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 125,038 125,038 125,038 125,038 125,038

15 CIELO RASO
15.1 APLIQUE YESO ML ### 73,910 73,910 73,910 73,910 73,910
15.2 ARMADURA MADERA Y MALLA M2 ### 36,494 36,494 36,494 36,494 36,494
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 56,300 56,300 56,300 56,300 56,300
15.4 CIELO RASO DURACUSTIC M2 ### 69,062 69,062 69,062 69,062 69,062
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,556 51,556 51,556 51,556 51,556
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 95,549 95,549 95,549 95,549 95,549
15.7 CORNISAS YESO ML ### 49,604 49,604 49,604 49,604 49,604
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 105,592 105,592 105,592 105,592 105,592
15.9 MALLA CON VENA M2 ### 13,656 13,656 13,656 13,656 13,656

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 100,493 85,072 110,773 131,334 97,066
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 92,843 78,841 100,682 106,843 91,722
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 120,540 105,120 154,808 161,662 142,815
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 73,265 57,844 83,545 104,106 61,271
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 107,380 91,959 141,648 148,502 129,654
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 117,510 102,089 151,778 158,631 139,784

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 306,507 306,507 306,507 306,507 306,507
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ###
i 903,144 903,144 903,144 903,144 903,144
p
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### i 489,438 489,438 489,438 489,438 489,438
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### o 142,064 142,064 142,064 142,064 142,064
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 198,799 198,799 198,799 198,799 198,799
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 184,640 184,640 184,640 184,640 184,640
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 406,203 406,203 406,203 406,203 406,203
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,038,607 1,038,607 1,038,607 1,038,607 1,038,607
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 295,134 295,134 295,134 295,134 295,134
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 209,163 209,163 209,163 209,163 209,163
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 83,349 83,349 83,349 83,349 83,349
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE
17.12 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 253,181 253,181 253,181 253,181 253,181
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE
17.13 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 372,856 372,856 372,856 372,856 372,856

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,445 8,445 8,445 8,445 8,445
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,130 3,130 3,130 3,130 3,130
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,254 11,254 11,254 11,254 11,254
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,768 42,768 42,768 42,768 42,768
18.5 CARBURO SOBRE PAÑETES M2 ### 5,899 5,899 5,899 5,899 5,899
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 66,606 66,606 66,606 66,606 66,606
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,509 3,509 3,509 3,509 3,509
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,808 2,808 2,808 2,808 2,808
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,101 14,101 14,101 14,101 14,101
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,084 4,084 4,084 4,084 4,084
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,869 14,869 14,869 14,869 14,869
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,817 5,817 5,817 5,817 5,817
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,620 6,620 6,620 6,620 6,620
18.14 ESTUCO M2 ### 7,094 7,094 7,094 7,094 7,094
18.15 ESTUCO (LINEAL) ML ### 4,442 4,442 4,442 4,442 4,442
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,695 15,695 15,695 15,695 15,695
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,727 9,727 9,727 9,727 9,727
18.18 LACA PISOS MADERA M2 ### 23,008 23,008 23,008 23,008 23,008
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,716 2,716 2,716 2,716 2,716
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,326 12,326 12,326 12,326 12,326
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,326 3,326 3,326 3,326 3,326
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,743 12,743 12,743 12,743 12,743
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ###
i 7,165 7,165 7,165 7,165 7,165
p
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### i 4,503 4,503 4,503 4,503 4,503
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### o 22,078 22,078 22,078 22,078 22,078
18.26 PINTURA EPÓXICA M2 ### 12,822 12,822 12,822 12,822 12,822
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,920 7,920 7,920 7,920 7,920

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,149,399 6,149,399 6,149,399 6,149,399 6,149,399
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR)
UN ### 10,865,035 10,865,035 10,865,035 10,865,035 10,865,035
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,843,411 2,843,411 2,843,411 2,843,411 2,843,411
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,292,411 9,292,411 9,292,411 9,292,411 9,292,411
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,702,001 8,702,001 8,702,001 8,702,001 8,702,001
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,716 2,716 2,716 2,716 2,716
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 872,721 872,721 872,721 872,721 872,721
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 87,194 87,194 87,194 87,194 87,194
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,578,948 1,578,783 1,579,041 1,579,132 1,578,935
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 678,074 674,070 680,316 682,573 677,754

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,691 29,691 29,691 29,691 29,691
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,145 44,145 44,145 44,145 44,145
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 54,740 54,740 54,740 54,740 54,740
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 17,820 17,820 17,820 17,820 17,820
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,596 21,596 21,596 21,596 21,596
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,454 29,454 29,454 29,454 29,454
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,331 26,331 26,331 26,331 26,331
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,761 27,761 27,761 27,761 27,761
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,724 34,724 34,724 34,724 34,724
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,866 17,866 17,866 17,866 17,866
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,422 23,422 23,422 23,422 23,422
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,032 36,032 36,032 36,032 36,032
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 276,290 276,290 276,290 276,290 276,290
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 317,991 317,991 317,991 317,991 317,991
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 331,638 331,638 331,638 331,638 331,638
20.16 ACOMETIDA GAS 1/2" ML ### 307,604 307,604 307,604 307,604 307,604
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
21.1 INSTALACIONES RED VOZ Y DATOS
i
p
21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### i 224,562 224,562 224,562 224,562 224,562
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### o 34,426 34,426 34,426 34,426 34,426
21.3 SIRENA DE 110 V UN ### 104,816 104,816 104,816 104,816 104,816
21.4 CÁMARA CCTV UN ### 266,024 266,024 266,024 266,024 266,024
21.5 PARLANTE-CIELO FALSO UN ### 52,630 52,630 52,630 52,630 52,630
21.6 AMPLIFICADOR 100W UN ### 580,490 580,490 580,490 580,490 580,490
21.7 AMPLIFICADOR 300W UN ### 1,439,697 1,439,697 1,439,697 1,439,697 1,439,697
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,208 45,208 45,208 45,208 45,208
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 224,636 224,636 224,636 224,636 224,636
21.10 TOMA PARA MICRÓFONO UN ### 44,483 44,483 44,483 44,483 44,483
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,808 3,808 3,808 3,808 3,808
21.12 SPLITERS UN ### 6,400 6,400 6,400 6,400 6,400
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,816 18,816 18,816 18,816 18,816
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,662 24,662 24,662 24,662 24,662
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 32,020 32,020 32,020 32,020 32,020
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 124,369 124,369 124,369 124,369 124,369
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,446 32,446 32,446 32,446 32,446
21.18 BANDEJA PORTACABLES PARA RACK UN ### 106,117 106,117 106,117 106,117 106,117
21.19 RACK 2' X 24" UN ### 185,830 185,830 185,830 185,830 185,830
21.20 RACK 3' X 24" UN ### 292,059 292,059 292,059 292,059 292,059
21.21 RACK 5' X 24" UN ### 362,786 362,786 362,786 362,786 362,786
21.22 RACK 7' X 24" UN ### 396,403 396,403 396,403 396,403 396,403
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 580,483 580,483 580,483 580,483 580,483
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 341,942 341,942 341,942 341,942 341,942
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 105,419 105,419 105,419 105,419 105,419
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,040 14,040 14,040 14,040 14,040
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,697 28,697 28,697 28,697 28,697
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,062 5,062 5,062 5,062 5,062
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,660 35,660 35,660 35,660 35,660
21.30 CANALETA METÁLICA 4X10 CMS ML ### 37,262 37,262 37,262 37,262 37,262
21.31 CANALETA METÁLICA 6X10 CMS ML ### 38,064 38,064 38,064 38,064 38,064
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,825 24,825 24,825 24,825 24,825
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,461 27,461 27,461 27,461 27,461
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,568 28,568 28,568 28,568 28,568
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 48,033 48,033 48,033 48,033 48,033
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 621,502 621,502 621,502 621,502 621,502
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
21.37 SWITCH 10/100/1000 16 PUERTOS UN ###
i 319,222 319,222 319,222 319,222 319,222
p
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### i 89,553 89,553 89,553 89,553 89,553
21.39 CABLE TELEFÓNICO 2 PARES ML ### o 1,858 1,858 1,858 1,858 1,858
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,578 8,578 8,578 8,578 8,578
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,794 12,794 12,794 12,794 12,794
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,356 21,356 21,356 21,356 21,356
21.43 CABLE TELEVISIÓN RG6 ML ### 3,957 3,957 3,957 3,957 3,957
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,551 22,551 22,551 22,551 22,551
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,814 32,814 32,814 32,814 32,814
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,572 19,572 19,572 19,572 19,572
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,558 15,558 15,558 15,558 15,558
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 627,267 627,267 627,267 627,267 627,267
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
i
URBANISMOp
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 91,826 91,826 91,826 91,826 91,826
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 517,002 517,002 517,002 517,002 517,002
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,103,474 1,103,474 1,103,474 1,103,474 1,103,474
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 126,522 126,522 126,522 126,522 126,522
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 770,531 770,531 770,531 770,531 770,531
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,658,155 1,658,155 1,658,155 1,658,155 1,658,155
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,259 13,259 13,259 13,259 13,259
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,348 16,348 16,348 16,348 16,348
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,520 20,520 20,520 20,520 20,520
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,457 22,457 22,457 22,457 22,457
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,917 26,917 26,917 26,917 26,917
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,917 26,917 26,917 26,917 26,917
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 108,123 108,123 108,123 108,123 108,123
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 125,242 125,242 125,242 125,242 125,242
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 387,570 387,570 387,570 387,570 387,570
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 145,532 145,532 145,532 145,532 145,532
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 239,908 239,908 239,908 239,908 239,908
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,061,517 1,061,517 1,061,517 1,061,517 1,061,517
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,223,012 1,223,012 1,223,012 1,223,012 1,223,012
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,373 14,373 14,373 14,373 14,373
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,685 12,685 12,685 12,685 12,685
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,267 31,267 31,267 31,267 31,267
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 124,123 124,123 124,123 124,123 124,123
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 184,791 184,791 184,791 184,791 184,791
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,221 30,221 30,221 30,221 30,221
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 104,071 104,071 104,071 104,071 104,071
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 154,173 154,173 154,173 154,173 154,173
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,535 30,535 30,535 30,535 30,535
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 62,949 62,949 62,949 62,949 62,949
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 253,439 253,439 253,439 253,439 253,439
1.32 UNIÓN REPARACION PVC 4" UN ### 73,438 73,438 73,438 73,438 73,438
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 294,855 294,855 294,855 294,855 294,855
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 176,888 176,888 176,888 176,888 176,888
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 503,182 503,182 503,182 503,182 503,182
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ###
i 1,347,430 1,347,430 1,347,430 1,347,430 1,347,430
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 1,990,965 1,990,965 1,990,965 1,990,965 1,990,965
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,847 10,847 10,847 10,847 10,847
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,790 24,790 24,790 24,790 24,790
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 75,998 62,288 83,676 89,709 74,902
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 95,459 80,038 105,739 126,300 92,032
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 78,325 62,904 88,605 109,166 66,331
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 100,188 89,940 89,940 95,064 97,114
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 92,871 83,468 78,244 85,557 88,692
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 82,468 69,535 89,710 95,400 81,433

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 115,579 115,579 115,579 115,579 115,579
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,204,880 1,204,880 1,204,880 1,204,880 1,204,880
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 151,038 151,038 151,038 151,038 151,038
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,395,554 1,395,554 1,395,554 1,395,554 1,395,554
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 972,702 972,702 972,702 972,702 972,702
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,754 62,754 62,754 62,754 62,754
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 114,735 114,735 114,735 114,735 114,735
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 270,907 270,907 270,907 270,907 270,907
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 270,901 270,901 270,901 270,901 270,901
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 434,913 434,913 434,913 434,913 434,913
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 114,784 114,784 114,784 114,784 114,784
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 114,784 114,784 114,784 114,784 114,784
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 270,907 270,907 270,907 270,907 270,907
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 270,907 270,907 270,907 270,907 270,907
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 434,913 434,913 434,913 434,913 434,913
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 436,970 436,970 436,970 436,970 436,970
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 709,345 709,345 709,345 709,345 709,345
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,138,400 1,138,400 1,138,400 1,138,400 1,138,400
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 70,347 70,347 70,347 70,347 70,347
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 365,703 365,703 365,703 365,703 365,703
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 409,760 409,760 409,760 409,760 409,760
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,134,274 1,134,274 1,134,274 1,134,274 1,134,274
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 66,218 66,084 66,292 66,351 66,207
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 331,551 331,551 331,551 331,551 331,551
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 50,432 50,432 50,432 50,432 50,432
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 71,318 71,318 71,318 71,318 71,318
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 102,909 102,909 102,909 102,909 102,909
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 157,963 157,963 157,963 157,963 157,963
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 253,852 253,852 253,852 253,852 253,852
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 368,499 368,499 368,499 368,499 368,499
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 466,276 466,276 466,276 466,276 466,276
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 613,060 613,060 613,060 613,060 613,060
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 843,176 843,176 843,176 843,176 843,176

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 657,379 647,769 662,760 668,177 656,610
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO
4.2 E=1.5CM Y CAÑUELA) ML ### 649,201 641,874 653,304 656,528 648,615
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE
4.3 ARO Y TAPA HF) UN ### 706,720 700,314 710,308 713,919 706,208

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 779,743 767,731 786,469 793,240 778,782
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO
4.5 E=1.5CM Y CAÑUELA) ML ### 921,968 911,649 927,746 932,286 921,142
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.6 (INCLUYE ARO Y TAPA HF) UN ### 813,573 804,763 818,505 823,470 812,867
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 991,143 986,379 993,809 996,181 990,759
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,426,641 1,412,953 1,434,302 1,441,471 1,425,542
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,940,173 1,914,871 1,954,341 1,968,420 1,938,149
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,562,148 2,520,089 2,585,699 2,609,102 2,558,783
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,845,423 1,845,423 1,845,423 1,845,423 1,845,423
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,903,472 3,903,472 3,903,472 3,903,472 3,903,472
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE
4.13 PAÑETE INTERNO Y DEMOLICIÓN) UN ### 139,106 138,807 139,273 139,405 139,082

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 72,959 72,262 73,349 73,655 72,903
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 86,583 85,886 86,973 87,279 86,527
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 53,235 51,543 54,182 55,105 53,099
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###
i 58,139 56,457 59,080 60,028 58,004
p
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### i 58,344 56,725 59,250 60,151 58,214
5.6 BORDE SEPARADOR VERDE A-170 ML ### o 255,010 254,711 255,177 255,309 254,986
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,117 17,914 18,231 18,342 18,101
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 38,125 36,932 38,792 39,443 38,029
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 83,721 83,562 83,811 83,881 83,709
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 555,539 551,392 557,861 559,686 555,207
5.11 LOSETA PREFABRICADA A-40 M2 ### 62,384 61,699 62,767 63,068 62,329
5.12 LOSETA PREFABRICADA A-60 M2 ### 90,727 90,043 91,111 91,412 90,673
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 32,410 31,737 32,786 33,166 32,356
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 51,698 50,337 52,461 53,228 51,589
5.15 SARDINEL PREFABRICADO A-10 ML ### 95,114 93,164 99,184 100,050 97,689
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,229 59,815 60,461 60,643 60,196

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 202,618 201,817 203,067 203,518 202,554
6.2 BANCA EN CONCRETO M-30 UN ### 667,835 666,714 668,463 669,095 667,745
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 215,441 215,274 215,535 215,628 215,428
6.4 BOLARDO M-60 CONCRETO UN ### 161,095 160,134 161,634 162,175 161,019
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 162,963 162,002 163,501 164,043 162,886
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 191,234 190,231 191,795 192,355 191,154
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 58,471 57,938 58,770 59,004 58,428
6.8 BORDILLO PREFABRICADO A-80 ML ### 67,686 67,089 68,020 68,283 67,638
6.9 CANECA M-120 UN ### 313,083 312,949 313,157 313,216 313,072
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 825,257 824,776 825,526 825,797 825,219
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,388,953 3,388,632 3,389,132 3,389,313 3,388,927
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,486,286 3,485,965 3,486,465 3,486,646 3,486,260
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 486,956 486,622 487,143 487,330 486,929
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 643,645 642,308 644,394 645,140 643,538
6.15 BANCA EN MADERA M-50 UN ### 536,457 536,457 536,457 536,457 536,457
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 247,997 247,517 248,266 248,537 247,959
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 577,115 576,782 577,302 577,448 577,088
6.18 POSTE HISTÓRICO M-131 UN ### 6,439,321 6,436,918 6,440,666 6,442,020 6,439,128

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,050 4,050 4,050 4,050 4,050
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,489 43,489 43,489 43,489 43,489
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
7.3 SEÑAL DOBLE DE CICLORUTA UN ###
i 314,505 314,355 314,589 314,655 314,493
p
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### i 494,568 493,900 494,942 495,316 494,515
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### o 235,365 235,216 235,449 235,515 235,353
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 249,968 249,819 250,052 250,118 249,956
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 261,026 260,877 261,110 261,176 261,014
7.8 TACHAS REFLECTIVAS UN ### 13,594 13,594 13,594 13,594 13,594
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,517 14,517 14,517 14,517 14,517
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 118,130 118,130 118,130 118,130 118,130
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS p INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.2 201 P UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.3 200.1 UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.5 201.7 UNA DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,384 35,384 35,384 35,384 35,384
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
2.9 600.1 DISTANCIA MENOR DE 5 KM) M3 ### 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 600.2 DISTANCIA MENOR DE 5 KM) M3 ### 65,047 65,047 65,047 65,047 65,047
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A
2.11 600.3 UNA DISTANCIA MENOR DE 5 KM) M3 ### 79,821 79,821 79,821 79,821 79,821
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE
2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,035 19,035 19,035 19,035 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE
2.13 600.4 P SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 39,738 39,738 39,738 39,738 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE
2.14 600.5 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 31,203 31,203 31,203 31,203 31,203
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE
2.15 600.5 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 53,644 53,644 53,644 53,644 53,644
i
o
3 NORMA INV ESTRUCTURA DE PAVIMENTO
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 107,380 91,959 141,648 148,502 129,654
3.3 330.1 BASE GRANULAR M3 ### 117,510 102,089 151,778 158,631 139,784
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3.4 365.1 ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,226 3,226 3,226 3,226 3,226
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,185 1,185 1,185 1,185 1,185
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 221,780 218,167 223,803 225,392 221,491
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 65,603 64,573 66,180 66,653 65,521
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 572,682 547,969 648,467 608,927 625,402
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 580,119 555,407 655,904 616,364 632,839
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 617,828 593,115 693,613 654,073 670,548
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 609,869 585,157 685,654 646,114 662,589
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 328,970 325,380 291,212 307,101 304,524
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 265,648 250,227 299,916 306,769 287,922
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 254,387 238,966 288,655 295,508 276,661
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 38,510 38,510 38,510 38,510 38,510
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 170,964 170,964 170,964 170,964 170,964
3.15 311.1 AFIRMADO M3 ### 73,265 57,844 83,545 104,106 61,271
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,768 11,507 11,915 12,030 11,747
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,724 4,593 4,797 4,854 4,713
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3.18 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 610,577 595,580 618,975 627,153 609,377
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y
3.19 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 641,549 625,880 650,323 658,867 640,295
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y
3.20 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 662,053 645,961 671,064 679,817 660,765
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA,
3.21 *** SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,052 7,052 7,052 7,052 7,052
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 125,732 112,683 105,434 115,583 119,932

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 881,660 864,648 891,186 900,462 880,299
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 756,049 739,319 765,417 774,540 754,711
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ###
i 801,099 783,707 810,838 820,322 799,708
p
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### i 541,942 526,368 550,663 559,326 540,696
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### o 637,000 620,809 646,066 655,072 635,705
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 539,969 523,792 549,027 558,145 538,674
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 634,949 618,131 644,365 653,844 633,602
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 699,000 682,823 708,058 717,176 697,705
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 558,291 541,473 567,707 577,187 556,945
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 741,791 724,973 751,207 760,687 740,445
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-
4.11 650 P 36 KG ### 11,899 11,899 11,899 11,899 11,899
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-
4.12 650 P 588 GRADO B KG ### 15,264 15,264 15,264 15,264 15,264
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,793 1,793 1,793 1,793 1,793
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO
4.14 621.1 TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,691,682 2,691,682 2,691,682 2,691,682 2,691,682
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL
4.15 621.1 P (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS) ML ### 4,067,065 4,037,965 4,083,359 4,099,227 4,064,736
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,692,449 1,676,432 1,701,417 1,710,445 1,691,167
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 87,289 87,289 87,289 87,289 87,289
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 356,863 354,941 357,939 359,022 356,709
4.19 632 P BARANDA METÁLICA ML ### 423,248 423,248 423,248 423,248 423,248
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,952 16,952 16,952 16,952 16,952
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 453,560 427,470 469,181 490,886 444,850
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 124,295 109,797 109,797 117,046 119,945
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 98,831 84,597 108,321 127,300 95,668
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 351,681 334,801 361,133 370,561 350,330
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 357,619 342,846 355,854 365,144 354,708
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 366,262 351,489 364,497 373,787 363,351
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 371,373 356,958 369,407 378,371 368,491
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 380,016 365,601 378,050 387,014 377,134
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 487,114 470,836 496,228 505,105 485,811
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 580,225 563,302 589,700 598,929 578,871
4.31 681.1 GAVIÓN M3 ### 212,131 199,676 192,756 202,443 206,595
4.32 681.1 GAVIÓN MALLA PVC M3 ### 216,299 203,844 196,925 206,612 210,764
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 40,440 39,441 41,000 41,544 40,360
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 15,397 14,897 15,677 15,949 15,357
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
i
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
4.35 *** M2 ### p 10,125 10,125 10,125 10,125 10,125
(RESISTENCIA ÚLTIMA 25 KN)
i
o
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,429 14,429 14,429 14,429 14,429

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,412 19,412 19,412 19,412 19,412
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN)
M2 ### 23,266 23,266 23,266 23,266 23,266
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 29,891 29,891 29,891 29,891 29,891
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y
4.40 *** SEPARACIÓN) M2 ### 7,267 7,267 7,267 7,267 7,267
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y
4.41 *** SEPARACIÓN) M2 ### 8,278 8,278 8,278 8,278 8,278

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y


4.42 *** SEPARACIÓN) M2 ### 8,604 8,604 8,604 8,604 8,604
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y
4.43 *** SEPARACIÓN) M2 ### 6,134 6,134 6,134 6,134 6,134
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y
4.44 *** SEPARACIÓN) M2 ### 9,231 9,231 9,231 9,231 9,231
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y
4.45 *** SEPARACIÓN) M2 ### 7,530 7,530 7,530 7,530 7,530
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y
4.46 *** SEPARACIÓN)
M2 ### 9,231 9,231 9,231 9,231 9,231

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y


4.47 *** SEPARACIÓN) M2 ### 17,723 17,723 17,723 17,723 17,723

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE


4.48 661.1 I, INCLUYE EMBOQUILLADA ML ### 630,477 630,276 630,589 630,677 630,460

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 355,651 352,009 357,690 359,689 355,360

4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 883,015 883,015 883,015 883,015 883,015
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 142,315 127,488 152,200 171,970 130,783
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,432 4,432 4,432 4,432 4,432
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 85,956 85,956 85,956 85,956 85,956

4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 130,957 130,957 130,957 130,957 130,957
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 494,998 478,075 504,473 513,702 493,644
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño
4.56 682.1 P COLCHONETA RENO M3 ###
i 228,049 215,594 208,675 218,362 222,514
p
4.57 *** TRINCHO EN MADERA M2 ### i 68,016 68,016 68,016 68,016 68,016
o
5 NORMA INV SEÑALIZACIÓN
5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,050 4,050 4,050 4,050 4,050
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,489 43,489 43,489 43,489 43,489
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 83,846 83,846 83,846 83,846 83,846
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 69,754 69,754 69,754 69,754 69,754
5.5 730.1 DEFENSA METÁLICA ML ### 147,031 146,210 147,491 147,852 146,965
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,594 13,594 13,594 13,594 13,594

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 839 839 839 839 839
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE
6.2 801.6 RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM UN ### 131,984 131,984 131,984 131,984 131,984
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES
6.3 801.7 Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM ML ### 25,566 25,566 25,566 25,566 25,566
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,310 8,310 8,310 8,310 8,310
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A
6.6 801.4 UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,475 15,475 15,475 15,475 15,475
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 25,036 25,036 25,036 25,036 25,036
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,504 9,504 9,504 9,504 9,504

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
CONSTRUCCIÓN

1,996,427 1,980,758 1,998,933


1,165,373 1,157,539 1,166,627
14,201 14,201 14,201
15,920 15,920 15,920
18,409 18,409 18,409
66,135 66,135 66,135
46,264 46,096 46,290
21,328 21,161 21,355
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
10,480 10,480 10,480
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
909,621 905,960 909,391
10,478 10,478 10,478
3,782 3,782 3,782
2,707,298 2,707,298 2,707,298
250,360 250,360 250,360
9,189 9,189 9,189

98,780 85,072 97,066


189,743 173,725 192,305
297,878 297,878 297,878
207,425 207,425 207,425
22,313 22,313 22,313
623,807 607,308 626,445
624,270 607,307 626,983
581,240 565,357 583,780
49,774 49,774 49,774
153,516 153,516 153,516

191,768 191,768 191,768

238,026 238,026 238,026

300,296 300,296 300,296


103,723 102,580 103,905
127,744 126,088 128,009
567,091 551,208 569,631
91,875 91,875 91,875

38,549 38,450 38,565


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
199,693 199,594 199,709
467,896 444,600 464,851
226,504 222,937 226,504
258,061 252,271 258,089
337,799 329,490 338,230
105,132 104,933 105,082
1,296,108 1,294,118 1,295,611
115,556 114,457 115,732
73,037 72,457 73,130
27,879 27,568 27,929
45,038 44,727 45,087
59,093 58,658 59,163
80,948 80,450 81,027
112,166 111,730 112,235

962,358 957,383 963,153

1,358,900 1,348,951 1,360,491

1,766,076 1,746,178 1,769,258

42,554 42,554 42,554


56,192 56,192 56,192
788,332 772,448 790,872
253,162 239,579 252,711
97,029 95,487 97,276

114,397 112,546 114,693


126,883 124,416 127,277
133,850 131,229 134,270
153,044 149,806 153,562
170,089 166,388 170,681
188,690 184,526 189,356
99,969 99,694 100,013
937,475 921,591 940,015
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
95,694 95,495 95,726
77,572 75,983 77,826
87,037 85,094 87,348
101,183 98,747 101,573
687,086 671,202 689,626
48,891 48,408 48,969
272,912 265,818 274,046
4,226 4,226 4,226
4,432 4,432 4,432
6,208 6,208 6,208
834,346 818,462 836,886
756,419 739,032 759,200
828,411 812,527 830,951
808,335 792,452 810,875
1,018,923 1,003,039 1,021,463
301,429 283,497 304,298

29,299 28,877 29,366


49,692 49,271 49,760
35,204 35,105 35,220
164,889 164,690 164,921
43,675 43,191 43,752
26,940 26,741 26,972
99,888 99,490 99,951
89,243 87,631 89,501
92,176 92,176 92,176
54,012 54,012 54,012
88,761 88,761 88,761
52,304 52,304 52,304
102,987 102,987 102,987
60,738 60,738 60,738
114,574 114,574 114,574
66,532 66,532 66,532
40,966 40,766 40,998
24,797 24,697 24,813
53,489 53,356 53,511
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
32,124 32,057 32,135
60,185 60,051 60,206
36,145 36,078 36,156
99,746 99,080 99,853
58,952 58,619 59,006
37,574 37,441 37,595
22,768 22,701 22,778
74,784 74,518 74,827
45,053 44,920 45,075
88,573 88,374 88,604
53,625 53,525 53,641
183,468 182,535 183,617
110,128 109,661 110,202
90,681 90,202 90,758
54,679 54,439 54,717
47,183 46,884 47,230
28,690 28,541 28,714
34,024 33,891 34,046
20,718 20,651 20,729
51,422 51,155 51,465
31,492 31,359 31,513
99,283 98,883 99,347
60,390 60,190 60,422
72,447 72,180 72,489
43,714 43,581 43,735
152,159 151,225 152,308
92,484 92,017 92,558
31,993 31,893 32,009
36,660 36,315 36,716
61,941 61,481 62,015
5,255 5,255 5,255
50,056 49,634 50,123
10,620 10,620 10,620
14,022 14,022 14,022
18,321 18,321 18,321
25,630 25,630 25,630
38,195 38,195 38,195
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
4,792 4,673 4,812

16,191 16,191 16,191


5,716 5,617 5,732
6,902 6,803 6,918
8,190 8,091 8,206
6,889 6,889 6,889
13,752 13,752 13,752
24,295 23,960 24,349
14,742 14,574 14,769
21,051 20,771 21,096
12,809 12,669 12,832
20,404 20,069 20,458
12,486 12,318 12,513
21,051 20,771 21,096
12,809 12,669 12,832
21,659 21,420 21,698
13,112 12,993 13,132
17,521 17,308 17,555
10,756 10,649 10,773
17,028 16,773 17,069
10,510 10,382 10,530
21,829 21,549 21,874
13,178 13,038 13,201
21,183 20,847 21,236
12,855 12,687 12,882
17,639 17,383 17,680
10,797 10,669 10,817
22,072 21,736 22,126
13,704 13,536 13,731

26,738 26,338 26,802


82,632 81,826 82,761
55,863 55,863 55,863
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
22,299 22,299 22,299
35,002 35,002 35,002
81,595 81,595 81,595
63,918 63,918 63,918
37,223 37,223 37,223
85,508 85,508 85,508
102,083 102,083 102,083
149,969 149,969 149,969
59,325 59,325 59,325
82,483 82,483 82,483
75,008 75,008 75,008
132,933 132,933 132,933
77,610 77,610 77,610
57,036 57,036 57,036
32,586 32,586 32,586
59,495 58,998 59,575
47,543 47,543 47,543
43,592 43,592 43,592
36,848 36,848 36,848
36,073 36,073 36,073
36,343 36,343 36,343
51,090 51,090 51,090
44,933 44,933 44,933
82,144 82,144 82,144
151,567 151,567 151,567
68,178 68,178 68,178
42,921 42,921 42,921
33,602 33,602 33,602
58,479 58,479 58,479
20,187 20,187 20,187
24,262 24,262 24,262
26,271 26,271 26,271
33,795 33,795 33,795
22,338 22,338 22,338
52,574 52,574 52,574
358,894 358,894 358,894
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
412,206 412,206 412,206
273,114 273,114 273,114
291,690 291,690 291,690

432,358 415,793 435,007


377,599 362,178 380,065
375,764 359,746 378,326
329,080 312,963 331,658
306,276 289,562 308,949
277,539 260,129 280,324
233,925 220,195 236,120
446,565 433,234 448,697
415,777 399,788 418,335
477,474 462,520 479,866
705,214 690,260 707,606

124,282 124,282 124,282


3,951 3,852 3,967
139,146 139,146 139,146
170,321 170,321 170,321
247,268 247,268 247,268
275,197 275,197 275,197
303,158 303,158 303,158
201,285 201,285 201,285
228,179 228,179 228,179
335,752 335,752 335,752
127,329 127,329 127,329
169,013 169,013 169,013
187,839 187,839 187,839
478,287 478,287 478,287
42,490 42,490 42,490
26,506 26,506 26,506
100,459 100,459 100,459
122,380 122,380 122,380
95,083 95,083 95,083
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
29,517 29,517 29,517
29,517 29,517 29,517
27,984 27,984 27,984
42,814 42,814 42,814
53,000 53,000 53,000
63,865 63,865 63,865
76,767 76,767 76,767
361,318 361,318 361,318
252,669 252,669 252,669
33,987 33,987 33,987
43,493 43,493 43,493
53,000 53,000 53,000
66,582 66,582 66,582

76,784 76,784 76,784


213,355 213,355 213,355
81,329 81,329 81,329
145,691 145,691 145,691
137,835 137,835 137,835
90,498 90,498 90,498
213,212 213,212 213,212
111,105 111,105 111,105
6,668 6,668 6,668
100,487 100,487 100,487
122,087 122,087 122,087
41,371 41,371 41,371
543,925 543,925 543,925
195,695 195,695 195,695
219,759 219,759 219,759
496,035 496,035 496,035
129,642 129,642 129,642
396,624 396,624 396,624
6,091 6,091 6,091
279,033 279,033 279,033
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
123,388 123,388 123,388
87,020 87,020 87,020
89,853 89,853 89,853

10,674 10,674 10,674

11,840 11,840 11,840

9,418 9,418 9,418

223,165 223,165 223,165


269,046 269,046 269,046
22,299 22,299 22,299
35,002 35,002 35,002
33,594 33,594 33,594
43,056 43,056 43,056
88,731 88,731 88,731
224,533 224,533 224,533
44,297 44,297 44,297
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
35,390 35,390 35,390
67,347 67,347 67,347
100,628 100,628 100,628
84,890 84,890 84,890
61,979 61,979 61,979
65,912 65,912 65,912
83,289 83,289 83,289
67,095 67,095 67,095
83,895 83,895 83,895
89,715 89,715 89,715
74,303 74,303 74,303
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
12,598 12,598 12,598
17,724 17,724 17,724
23,145 23,145 23,145
14,303 14,303 14,303
8,550 8,550 8,550
51,528 51,528 51,528
32,971 32,971 32,971
10,703 10,703 10,703
25,479 25,479 25,479
35,340 35,340 35,340
47,953 47,953 47,953
89,578 89,578 89,578
108,841 108,841 108,841
60,686 60,686 60,686
77,251 77,251 77,251
186,563 186,563 186,563
384,647 384,647 384,647
284,222 284,222 284,222
17,770 17,770 17,770
22,424 22,424 22,424
174,411 174,411 174,411
283,826 283,826 283,826
472,264 472,264 472,264
40,840 40,840 40,840

48,155 48,155 48,155

61,822 61,822 61,822

70,070 70,070 70,070

90,289 90,289 90,289

104,617 104,617 104,617

154,745 154,745 154,745


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
62,372 62,372 62,372
62,626 62,626 62,626
40,362 40,362 40,362
49,721 49,721 49,721
4,211 4,211 4,211
6,634 6,634 6,634
1,025,183 1,025,183 1,025,183
783,412 783,412 783,412
2,631,198 2,631,198 2,631,198
2,193,826 2,193,826 2,193,826
637,549 637,549 637,549
824,726 824,726 824,726
317,246 317,246 317,246

367,044 367,044 367,044


58,317 58,317 58,317
69,019 69,019 69,019
76,646 76,646 76,646
90,253 90,253 90,253
54,846 54,846 54,846
62,500 62,500 62,500
144,362 144,362 144,362
56,300 56,300 56,300
129,368 129,368 129,368
77,389 77,389 77,389
45,884 45,884 45,884
96,752 96,752 96,752
413,152 413,152 413,152
550,227 550,227 550,227
3,563 3,563 3,563
4,704 4,704 4,704
7,318 7,318 7,318
13,091 13,091 13,091
275,025 275,025 275,025
77,735 77,735 77,735
105,191 105,191 105,191
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
43,000 43,000 43,000
1,410,512 1,410,512 1,410,512
1,045,355 1,045,355 1,045,355
1,305,919 1,305,919 1,305,919
607,437 607,437 607,437
110,992 110,992 110,992
509,614 509,614 509,614
637,527 637,527 637,527
1,683,597 1,683,597 1,683,597
1,239,857 1,239,857 1,239,857

40,028 39,452 40,120


39,727 39,152 39,819
14,834 14,719 14,852
28,115 26,965 28,299
85,710 84,559 85,894
26,400 26,066 26,453
55,674 54,062 55,932
76,653 74,074 77,066
30,738 30,738 30,738
23,264 23,264 23,264
27,311 27,311 27,311
45,095 43,644 45,327
52,718 50,945 53,002
76,142 73,402 76,580
91,582 78,134 93,734
102,430 83,526 102,190

57,935 57,705 57,972


34,639 34,524 34,658
66,141 65,566 66,233
69,541 68,966 69,633
73,845 73,270 73,937
76,374 76,144 76,411
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
37,561 37,319 37,600
166,107 165,072 166,273
46,759 46,160 46,855
44,472 44,472 44,472
10,218 9,976 10,257
9,522 9,522 9,522
12,780 12,780 12,780
10,689 10,689 10,689
17,890 17,890 17,890
34,832 34,832 34,832
9,364 9,364 9,364
75,520 75,520 75,520
120,179 119,373 120,307
7,659 7,659 7,659
32,378 32,179 32,410
46,591 46,591 46,591
54,136 54,136 54,136
49,938 49,938 49,938
50,255 50,025 50,292
56,404 56,174 56,441
11,115 11,115 11,115
50,129 49,831 50,177
20,932 20,932 20,932
125,232 125,232 125,232
10,105 10,105 10,105
22,855 22,855 22,855
14,677 14,677 14,677
14,260 14,260 14,260
8,685 8,685 8,685
8,837 8,837 8,837
19,368 19,368 19,368
17,654 17,654 17,654
18,960 18,960 18,960
21,918 21,918 21,918
66,213 65,983 66,249
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
78,660 78,660 78,660
34,660 34,660 34,660
13,480 13,480 13,480
103,289 103,289 103,289
125,038 125,038 125,038

73,910 73,910 73,910


36,494 36,494 36,494
56,300 56,300 56,300
69,062 69,062 69,062
51,556 51,556 51,556
95,549 95,549 95,549
49,604 49,604 49,604
105,592 105,592 105,592
13,656 13,656 13,656

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
43,707 43,707 43,707

49,987 49,987 49,987


85,005 85,005 85,005
19,114 19,114 19,114
119,340 85,072 110,773
95,642 81,641 97,883
135,961 122,254 134,248
88,686 74,978 86,972
122,801 109,093 121,087
132,930 119,223 131,217

306,507 306,507 306,507


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
903,144 903,144 903,144
489,438 489,438 489,438
142,064 142,064 142,064
198,799 198,799 198,799
184,640 184,640 184,640
406,203 406,203 406,203
1,038,607 1,038,607 1,038,607
295,134 295,134 295,134
209,163 209,163 209,163
83,349 83,349 83,349
253,181 253,181 253,181

372,856 372,856 372,856

8,445 8,445 8,445


3,130 3,130 3,130
11,254 11,254 11,254
42,768 42,768 42,768
5,899 5,899 5,899
66,606 66,606 66,606
3,509 3,509 3,509
2,808 2,808 2,808
14,101 14,101 14,101
4,084 4,084 4,084
14,869 14,869 14,869
5,817 5,817 5,817
6,620 6,620 6,620
7,094 7,094 7,094
4,442 4,442 4,442
15,695 15,695 15,695
9,727 9,727 9,727
23,008 23,008 23,008
2,716 2,716 2,716
12,326 12,326 12,326
3,326 3,326 3,326
12,743 12,743 12,743
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
7,165 7,165 7,165
4,503 4,503 4,503
22,078 22,078 22,078
12,822 12,822 12,822
7,920 7,920 7,920

6,149,399 6,149,399 6,149,399


10,865,035 10,865,035 10,865,035
2,843,411 2,843,411 2,843,411
9,292,411 9,292,411 9,292,411
8,702,001 8,702,001 8,702,001
2,716 2,716 2,716
872,721 872,721 872,721
87,194 87,194 87,194
1,578,982 1,578,816 1,579,008
678,875 674,871 679,516

29,691 29,691 29,691


44,145 44,145 44,145
54,740 54,740 54,740
17,820 17,820 17,820
21,596 21,596 21,596
29,454 29,454 29,454
26,331 26,331 26,331
27,761 27,761 27,761
34,724 34,724 34,724
17,866 17,866 17,866
23,422 23,422 23,422
36,032 36,032 36,032
276,290 276,290 276,290
317,991 317,991 317,991
331,638 331,638 331,638
307,604 307,604 307,604
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima

224,562 224,562 224,562


34,426 34,426 34,426
104,816 104,816 104,816
266,024 266,024 266,024
52,630 52,630 52,630
580,490 580,490 580,490
1,439,697 1,439,697 1,439,697
45,208 45,208 45,208
224,636 224,636 224,636
44,483 44,483 44,483
3,808 3,808 3,808
6,400 6,400 6,400
18,816 18,816 18,816
24,662 24,662 24,662
32,020 32,020 32,020
124,369 124,369 124,369
32,446 32,446 32,446
106,117 106,117 106,117
185,830 185,830 185,830
292,059 292,059 292,059
362,786 362,786 362,786
396,403 396,403 396,403
580,483 580,483 580,483
341,942 341,942 341,942
105,419 105,419 105,419
14,040 14,040 14,040
28,697 28,697 28,697
5,062 5,062 5,062
35,660 35,660 35,660
37,262 37,262 37,262
38,064 38,064 38,064
24,825 24,825 24,825
27,461 27,461 27,461
28,568 28,568 28,568
48,033 48,033 48,033
621,502 621,502 621,502
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
319,222 319,222 319,222
89,553 89,553 89,553
1,858 1,858 1,858
8,578 8,578 8,578
12,794 12,794 12,794
21,356 21,356 21,356
3,957 3,957 3,957
22,551 22,551 22,551
32,814 32,814 32,814
19,572 19,572 19,572
15,558 15,558 15,558
627,267 627,267 627,267
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
URBANISMO

9,712 9,712 9,712


91,826 91,826 91,826
517,002 517,002 517,002
1,103,474 1,103,474 1,103,474
126,522 126,522 126,522
770,531 770,531 770,531
1,658,155 1,658,155 1,658,155
13,259 13,259 13,259
16,348 16,348 16,348
20,520 20,520 20,520
22,457 22,457 22,457
26,917 26,917 26,917
26,917 26,917 26,917
108,123 108,123 108,123
125,242 125,242 125,242
387,570 387,570 387,570
145,532 145,532 145,532
239,908 239,908 239,908
1,061,517 1,061,517 1,061,517
1,223,012 1,223,012 1,223,012
14,373 14,373 14,373
12,685 12,685 12,685
31,267 31,267 31,267
124,123 124,123 124,123
184,791 184,791 184,791
30,221 30,221 30,221
104,071 104,071 104,071
154,173 154,173 154,173
30,535 30,535 30,535
62,949 62,949 62,949
253,439 253,439 253,439
73,438 73,438 73,438
294,855 294,855 294,855
176,888 176,888 176,888
503,182 503,182 503,182
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
1,347,430 1,347,430 1,347,430
1,990,965 1,990,965 1,990,965

10,847 10,847 10,847


24,790 24,790 24,790
19,114 19,114 19,114
78,741 65,031 80,934
114,306 80,038 105,739
93,745 80,038 92,032
107,362 91,989 107,362
102,273 93,915 97,050
85,055 72,121 87,123

115,579 115,579 115,579


1,204,880 1,204,880 1,204,880
151,038 151,038 151,038
1,395,554 1,395,554 1,395,554
972,702 972,702 972,702
62,754 62,754 62,754
114,735 114,735 114,735
270,907 270,907 270,907
270,901 270,901 270,901
434,913 434,913 434,913
114,784 114,784 114,784
114,784 114,784 114,784
270,907 270,907 270,907
270,907 270,907 270,907
434,913 434,913 434,913
436,970 436,970 436,970
709,345 709,345 709,345
1,138,400 1,138,400 1,138,400
70,347 70,347 70,347
365,703 365,703 365,703
409,760 409,760 409,760
1,134,274 1,134,274 1,134,274
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
66,244 66,111 66,266
331,551 331,551 331,551
50,432 50,432 50,432
71,318 71,318 71,318
102,909 102,909 102,909
157,963 157,963 157,963
253,852 253,852 253,852
368,499 368,499 368,499
466,276 466,276 466,276
613,060 613,060 613,060
843,176 843,176 843,176

659,301 649,690 660,838

650,667 643,339 651,839

708,002 701,594 709,026

782,146 770,132 784,067

924,031 913,713 925,682

815,334 806,524 816,743


992,094 987,330 992,858
1,429,376 1,415,687 1,431,567
1,945,234 1,919,930 1,949,280
2,570,561 2,528,498 2,577,287
1,845,423 1,845,423 1,845,423
3,903,472 3,903,472 3,903,472
139,166 138,867 139,214

73,098 72,401 73,209


86,722 86,025 86,833
53,573 51,881 53,844
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
58,475 56,793 58,744
58,668 57,049 58,927
255,070 254,770 255,117
18,158 17,955 18,190
38,363 37,171 38,554
83,753 83,594 83,779
556,368 552,221 557,032
62,521 61,836 62,630
90,864 90,180 90,974
32,544 31,872 32,652
51,971 50,609 52,188
96,937 95,186 96,764
60,312 59,898 60,378

202,778 201,977 202,906


668,059 666,938 668,239
215,475 215,308 215,501
161,288 160,327 161,441
163,155 162,194 163,309
191,434 190,432 191,595
58,578 58,044 58,663
67,805 67,208 67,901
313,109 312,976 313,131
825,353 824,873 825,430
3,389,017 3,388,696 3,389,068
3,486,350 3,486,029 3,486,401
487,023 486,688 487,076
643,912 642,575 644,126
536,457 536,457 536,457
248,094 247,613 248,170
577,182 576,849 577,235
6,439,801 6,437,398 6,440,185

4,050 4,050 4,050


43,489 43,489 43,489
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
314,535 314,385 314,559
494,702 494,033 494,809
235,395 235,246 235,419
249,998 249,849 250,022
261,056 260,907 261,080
13,594 13,594 13,594
14,517 14,517 14,517

118,130 118,130 118,130


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
ICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548


35,384 35,384 35,384
8,749 8,749 8,749
14,967 14,967 14,967
13,068 13,068 13,068
7,499 7,499 7,499
481 481 481
12,832 12,832 12,832

20,948 20,948 20,948

65,047 65,047 65,047

79,821 79,821 79,821

19,035 19,035 19,035

39,738 39,738 39,738

31,203 31,203 31,203


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima

53,644 53,644 53,644

5,366 5,366 5,366


122,801 109,093 121,087
132,930 119,223 131,217
139,125 139,125 139,125
3,226 3,226 3,226
1,185 1,185 1,185
222,502 218,890 223,080
65,809 64,779 65,974
564,444 572,682 589,157
571,882 580,119 596,594
609,590 617,828 634,303
601,632 609,869 626,344
344,414 347,015 318,726
281,068 267,361 279,355
269,807 256,100 268,094
38,510 38,510 38,510
170,964 170,964 170,964
88,686 74,978 86,972
11,821 11,559 11,862
4,750 4,619 4,771
613,577 598,579 615,975

644,683 629,013 647,189

665,271 649,179 667,845

7,052 7,052 7,052


138,780 127,181 131,531

885,063 868,050 887,783


759,395 742,664 762,070
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
804,578 787,184 807,359
545,057 529,482 547,548
640,238 624,046 642,828
543,204 527,026 545,792
638,312 621,493 641,002
702,235 686,057 704,823
561,654 544,835 564,344
745,154 728,335 747,844
11,899 11,899 11,899

15,264 15,264 15,264


1,793 1,793 1,793
2,691,682 2,691,682 2,691,682

4,072,885 4,043,784 4,077,539


1,695,652 1,679,634 1,698,214
87,289 87,289 87,289
357,247 355,325 357,554
423,248 423,248 423,248
16,952 16,952 16,952
466,369 441,333 467,970
134,443 112,696 134,443
116,229 84,597 108,321
355,057 338,176 357,757
364,370 350,124 363,337
373,013 358,767 371,980
378,052 364,164 376,963
386,695 372,807 385,606
490,369 474,091 492,973
583,609 566,687 586,316
224,586 213,515 217,666
228,754 217,683 221,835
40,640 39,641 40,800
15,497 14,997 15,577
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima

10,125 10,125 10,125

14,429 14,429 14,429

19,412 19,412 19,412

23,266 23,266 23,266

29,891 29,891 29,891

7,267 7,267 7,267

8,278 8,278 8,278

8,604 8,604 8,604

6,134 6,134 6,134

9,231 9,231 9,231

7,530 7,530 7,530

9,231 9,231 9,231

17,723 17,723 17,723

630,517 630,316 630,549

356,379 352,738 356,962

883,015 883,015 883,015


157,143 143,963 155,495
4,432 4,432 4,432
85,956 85,956 85,956

130,957 130,957 130,957


498,382 481,460 501,089
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: ALTO MAGDALENA
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Nilo Ricaurte Tocaima
240,505 229,433 233,585
68,016 68,016 68,016

4,050 4,050 4,050


43,489 43,489 43,489
83,846 83,846 83,846
69,754 69,754 69,754
147,195 146,375 147,327
13,594 13,594 13,594

839 839 839


131,984 131,984 131,984

25,566 25,566 25,566


8,310 8,310 8,310
448,890 448,890 448,890
1,804 1,804 1,804
15,475 15,475 15,475
25,036 25,036 25,036
9,504 9,504 9,504

APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
CONSTRUCCIÓN p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 2,207,609
1.2 CAMPAMENTO 9 M2 UN ### 1,274,729
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,622
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,396
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,937
1.6 CERCA EN TABLA H=2.30 M ML ### 69,481
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 49,766
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 23,470
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 972,973
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,963
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,971
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,855,865
1.44 RED TELEFÓNICA PROVISIONAL UN ### 262,620
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 177,448
2.2 BASE ARENA CEMENTO 1:20 M3 ### 265,066
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 23,437
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 773,124
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 773,205
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 719,579
2.9 PILOTE DE MADERA D=20 CM ML ### 50,335
2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 155,339

2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 195,831

2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 244,798

2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 310,715
2.14 PILOTE HINCADO 25X25 ML ### 114,663
2.15 PILOTE HINCADO 30X30 ML ### 143,600
2.16 DADOS EN CONCRETO 3500PSI M3 ### 705,430
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 93,074

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ###
i 40,576
p
3.2 SIFÓN EN PVC 6" UN ### i 211,359
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### o 538,555
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 247,336
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 287,274
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 382,891
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 107,272
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,373,405
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 124,808
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 78,923
3.11 TUBERÍA DRENAJE PVC 110 ML ### 31,927
3.12 TUBERÍA DRENAJE PVC 160 ML ### 50,088
3.13 TUBERÍA DRENAJE PVC 200 ML ### 66,095
3.14 TUBERÍA DRENAJE PVC 250 ML ### 89,840
3.15 TUBERÍA DRENAJE PVC 315 ML ### 122,420
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,062,720
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,530,234
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 2,055,345

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 44,614
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 59,099
4.3 COLUMNAS 3500 PSI M3 ### 932,619
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 316,329
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.5 PSI M2 ### 113,081
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.6 PSI M2 ### 133,728
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 149,580
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 157,958
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 182,606
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 203,790
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 226,504
4.12 ENTREPISO VIGUETA PLACA M2 ### 106,124
4.13 ESCALERA MACIZA 3500 PSI M3 ### 1,089,403
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 101,490
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 92,109
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 104,640
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 123,053
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ###
i 827,312
p
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### i 53,497
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### o 334,678
4.21 ACERO FIGURADO 37000 PSI KG ### 4,453
4.22 ACERO FIGURADO 60000 PSI KG ### 4,670
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,449
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 976,141
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 908,876
4.26 VIGA AÉREA 3500 PSI M3 ### 970,965
4.27 VIGA CINTA 3500 PSI M3 ### 950,917
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,162,107
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 456,661

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 32,606
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 53,076
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,539
5.4 ARCOS EN LADRILLO PRENSADO ML ### 170,132
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 48,238
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,592
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 106,337
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 104,339
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,785
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,816
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 92,158
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,002
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 107,465
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,978
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 119,775
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 69,133
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 43,366
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,997
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 56,481
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,620
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 63,441
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,773
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 106,922
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ###
i 62,540
p
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### i 39,519
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### o 23,740
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 78,946
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 47,134
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 93,732
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 56,204
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 196,241
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 116,514
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 96,268
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 57,472
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 50,377
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 30,287
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 35,796
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,604
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 54,761
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 33,161
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 105,463
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 63,480
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 76,780
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,917
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 163,116
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 98,015
5.47 REMATES LADRILLO PRENSADO ML ### 33,545
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 39,074
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 65,631
5.50 LAVADA DE FACHADA M2 ### 5,292
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 53,448
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,692
5.53 ANCLAJE 3/8" L=30CM UN ### 14,248
5.54 ANCLAJE 1/2" L=50CM UN ### 18,654
5.55 ANCLAJE 5/8" L=70CM UN ### 26,309
5.56 ANCLAJE 3/4" L=70CM UN ### 39,497
5.57 ANCLAJE 1" L= 70CM UN ### 5,839

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,399
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
6.2 FILOS O DILATACIONES B/PLACA ML ###
i 6,217
p
6.3 FILOS O DILATACIONES S/MURO ML ### i 7,403
6.4 GOTERA EN MORTERO 1:4 ML ### o 8,752
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,173
6.6 MALLA BAJO ENTRAMADO M2 ### 14,027
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,645
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,417
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,651
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,609
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,754
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,161
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,651
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,609
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,932
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,749
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,740
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,365
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 18,057
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,024
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 23,429
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,978
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 22,533
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,530
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,667
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,311
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 23,422
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,379

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 29,023
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### 92,114
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 58,694
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,174
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,469
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 85,945
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 67,170
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,812
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ###
i 90,102
p
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### i 107,707
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### o 158,572
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 62,190
7.13 CANAL PVC AMAZONAS ML ### 86,163
7.14 CANAL PVC RAINGO ML ### 78,222
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 139,912
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 81,857
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 60,004
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,684
7.19 TEJA DE BARRO M2 ### 63,563
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 50,038
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 45,840
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,310
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 37,543
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,831
7.25 TEJA TERMOACÚSTICA M2 ### 53,543
7.26 TEJA PLÁSTICA No.6 M2 ### 47,003
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 86,426
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 160,094
7.29 TEJA SIN TRASLAPO M2 ### 71,779
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,139
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,725
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 61,149
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,709
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,037
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,222
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,212
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,094
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,451
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 380,467
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 423,505
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 286,853
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 307,131

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 572,464
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
8.2 CONCRETO 3500 PSI M3 ###
i 510,921
p
8.3 CONCRETO 3000 PSI M3 ### i 515,985
8.4 CONCRETO 2500 PSI M3 ### o 459,517
8.5 CONCRETO 2000 PSI M3 ### 445,528
8.6 CONCRETO 1500 PSI M3 ### 428,249
8.7 MORTERO SECO 1:10 M3 ### 301,775
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 522,753
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 480,063
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 542,839
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 784,739

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 130,021
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,506
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 145,014
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 178,128
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 260,990
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 290,616
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 320,274
9.8 HOJA PUERTA FORTEC 0.81 UN ### 212,997
9.9 HOJA PUERTA FORTEC 0.91 UN ### 241,564
9.10 HOJA PUERTA FORTEC 1.50 UN ### 355,830
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 134,439
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 178,717
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 198,714
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 507,232
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,262
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,283
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,596
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 129,571
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 100,576
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,931
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,931
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 29,302
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,715
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 55,535
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 67,075
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ###
i 80,780
p
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### i 382,442
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### o 267,033
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,338
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,436
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 55,535
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 69,961

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 80,166
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 225,234
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 84,532
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 150,105
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 143,623
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 94,270
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 222,807
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,694
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,919
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 103,253
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 127,869
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,551
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 575,228
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 206,127
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 229,944
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 523,641
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 133,723
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 419,905
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,330
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 294,401
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 127,576
10.21 REJILLA PISO 0.30 M M2 ### 90,964
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,699
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,989
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, p
10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ###
i 12,228
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
o
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,656
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 230,334
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 279,077
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,174
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 36,469
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,846
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,808
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 92,760
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 231,791
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,369
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924
11.12 LLAVE MANGUERA UN ### 36,473
11.13 NIPLE PASAMURO 2" UN ### 68,853
11.14 NIPLE PASAMURO 4" UN ### 103,054
11.15 PUNTO AGUA CALIENTE CPVC UN ### 87,487
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 63,150
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 67,332
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 85,115
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 69,033
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 86,876
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 93,060
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 77,706
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,112
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,560
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 24,212
11.26 RED SUMINISTRO PVC 1" ML ### 14,895
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,858
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 54,173
11.29 RED SUMINISTRO PVC 2" ML ### 34,575
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,121
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
11.31 RED SANITARIA PVC-S 2" ML ###
i 26,617
p
11.32 RED SANITARIA PVC-S 3" ML ### i 37,002
11.33 RED SANITARIA PVC-S 4" ML ### o 50,265
11.34 RED SANITARIA PVC-S 6" ML ### 94,480
11.35 REGISTRO 1" UN ### 114,271
11.36 REGISTRO 1/2" UN ### 63,622
11.37 REGISTRO 3/4" UN ### 81,219
11.38 REGISTRO 1 1/2" UN ### 196,827
11.39 REGISTRO 2 1/2" UN ### 406,899
11.40 REGISTRO 2" UN ### 300,226
11.41 REVENTILACIÓN 2" ML ### 18,502
11.42 REVENTILACIÓN 3" ML ### 23,371
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 181,907
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 297,010
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 494,934
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 42,805
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 50,513
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 64,430
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 73,436
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 94,701
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 108,925
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 160,806
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,550
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,819
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 42,079
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 52,020
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,427
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 7,001
11.59 GABINETE TIPO III UN ### 1,078,554
11.60 GABINETE TIPO I UN ### 821,742
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,786,337
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,321,755
11.63 VÁLVULA MARIPOSA 3" UN ### 668,601
11.64 VÁLVULA MARIPOSA 4" UN ### 867,424
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 336,265

12 INSTALACIONES ELÉCTRICAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
12.1 ACOMETIDA AÉREA 10 M. PVC UN ###
i 385,757
p
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### i 61,304
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### o 72,675
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 80,562
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 95,019
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 57,576
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 65,684
12.8 STRIP TELEFÓNICO 10 PARES UN ### 150,938
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 59,162
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 136,113
12.11 SALIDA T.V PVC COMPLETA. UN ### 81,281
12.12 SALIDA BIFÁSICA C.N. UN ### 48,217
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 101,319
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 432,302
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 576,472
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,735
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,929
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,679
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,726
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 288,726
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 81,355
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 110,519
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,459
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,474,559
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,092,411
12.26 POSTE METÁLICO 6M UN ### 1,377,528
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 642,990
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 116,555
12.29 LUMINARIA 70W SODIO UN ### 539,723
12.30 LUMINARIA 150W SODIO UN ### 675,594
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,786,657
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,315,313

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 43,103
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 43,141
13.3 ALISTADO PARA LISTÓN M2 ### 15,493
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ###
i 32,462
p
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### i 93,363
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### o 29,284
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 68,857
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 97,738
13.9 MANTO FIBERGLASS 600X1 M2 ### 32,122
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,986
13.11 PERMA PLY 2 CAPAS M2 ### 28,051
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 56,904
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 67,135
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 98,455
13.15 TRITURADO FINO 1/2 M3 ### 211,624
13.16 TRITURADO GRUESO 3/4 M3 ### 219,209

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 60,943
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 36,145
14.3 ADOQUÍN CONCRETO 6CM M2 ### 70,419
14.4 ADOQUÍN CONCRETO 8CM M2 ### 73,969
14.5 ADOQUÍN GRES PEATONAL M2 ### 78,497
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 80,603
14.7 GRAVILLA PARA GRADAS ML ### 38,864
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 177,136
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 49,818
14.10 GUARDAESCOBA EN GRANITO ML ### 45,497
14.11 GUARDAESCOBA EN GRAVILLA ML ### 11,402
14.12 GUARDAESCOBA PVC CARAMELO ML ### 10,035
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,494
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,061
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,711
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 36,708
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,482
14.18 LISTÓN M.H. AMARILLO M2 ### 78,476
14.19 PASO ESCALERA GRANITO ML ### 126,658
14.20 PIRLANES ALUMINIO ML ### 7,701
14.21 PIRLANES LADRILLO ML ### 33,985
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,850
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
14.23 PISO VINILO TRÁFICO PESADO M2 ###
i 56,897
p
14.24 PULIDA LACADA PISO MADERA M2 ### i 51,641
14.25 TABLETA DE GRES 25X25 M2 ### o 52,857
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 59,389
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,342
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 53,299
14.29 JABONERA PORCELANA ACUARIO UN ### 21,904
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 131,571
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,297
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,841
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,154
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,711
14.35 REMATES BOCEL ALUMINIO ML ### 8,810
14.36 REMATES BOCEL PORCELANA ML ### 8,972
14.37 TAPA REGISTRO 20X20 UN ### 20,138
14.38 TAPA REGISTRO 6X6 UN ### 18,317
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,139
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 23,282
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 70,001
14.42 MEDIA CAÑA EN GRANITO ML ### 83,089
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,880
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,981
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 109,568
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 132,232

15 CIELO RASO
15.1 APLIQUE YESO ML ### 78,009
15.2 ARMADURA MADERA Y MALLA M2 ### 37,166
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,384
15.4 CIELO RASO DURACUSTIC M2 ### 71,941
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,578
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,901
15.7 CORNISAS YESO ML ### 52,440
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 110,709
15.9 MALLA CON VENA M2 ### 13,925

16 EXCAVACIONES Y RELLENOS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
16.1 EXPLANACIÓN Y EXTENDIDA M3 ###
i 5,627
p
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA i
16.2 MENOR DE 5 KM) M3 ### 18,479
o
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 167,646
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 183,702
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 249,417
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 167,354
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 216,600
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 246,386

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 322,892
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 956,349
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 517,203
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 147,920
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 208,483
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 193,443
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 428,790
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,100,239
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 310,811
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 219,193
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 85,850
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA)
UN ### 266,246
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17.13 ACCESORIOS Y GRIFERÍA) UN ### 393,366

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,681
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,238
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ###
i 11,458
p
18.4 BARNIZ SOBRE MUEBLES M2 ### i 44,212
18.5 CARBURO SOBRE PAÑETES M2 ### o 6,014
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 70,416
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,560
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,897
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,464
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,205
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,259
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,068
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,883
18.14 ESTUCO M2 ### 7,202
18.15 ESTUCO (LINEAL) ML ### 4,496
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,071
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,914
18.18 LACA PISOS MADERA M2 ### 23,373
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,774
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,826
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,453
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,090
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,344
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,592
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,916
18.26 PINTURA EPÓXICA M2 ### 13,086
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,052

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,527,854
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR
19.2 (PAR)
UN ### 11,533,639
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,018,082
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,863,966
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,238,825
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,774
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 924,725
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 92,618
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,676,801
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ###
i 743,249
p
i
20 INSTALACIONES RED GASES o
20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,826
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 46,104
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 57,263
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,432
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,407
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,648
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,988
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,472
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,706
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,765
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,647
20.12 VÁLVULA DE BOLA GAS 1" UN ### 38,018
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 292,505
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 336,800
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 351,047
20.16 ACOMETIDA GAS 1/2" ML ### 324,903

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 237,264
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 36,517
21.3 SIRENA DE 110 V UN ### 110,280
21.4 CÁMARA CCTV UN ### 276,230
21.5 PARLANTE-CIELO FALSO UN ### 54,847
21.6 AMPLIFICADOR 100W UN ### 611,317
21.7 AMPLIFICADOR 300W UN ### 1,524,189
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,581
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 237,819
21.10 TOMA PARA MICRÓFONO UN ### 46,039
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,992
21.12 SPLITERS UN ### 6,766
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,195
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,226
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 32,838
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 131,173
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ###
i 34,200
p
21.18 BANDEJA PORTACABLES PARA RACK UN ### i 112,266
21.19 RACK 2' X 24" UN ### o 192,104
21.20 RACK 3' X 24" UN ### 304,942
21.21 RACK 5' X 24" UN ### 377,425
21.22 RACK 7' X 24" UN ### 413,134
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 600,736
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 352,641
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 111,139
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,868
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 30,437
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,271
21.29 CANALETA METÁLICA 4X6 CMS ML ### 36,927
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,629
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,480
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,738
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,537
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,713
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 50,390
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 654,881
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 335,116
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 92,481
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,929
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,923
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,393
21.42 CABLE TELEFÓNICO 40 PARES ML ### 22,420
21.43 CABLE TELEVISIÓN RG6 ML ### 4,124
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,897
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 33,535
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,156
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 16,208
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 664,025
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
URBANISMO p
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 97,119
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 548,328
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,170,447
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 133,974
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 817,630
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,760,474
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,749
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 17,030
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,462
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 23,519
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 28,256
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 28,256
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 114,598
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 132,699
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 410,843
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 154,334
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 254,413
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,126,719
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,298,260
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 15,016
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,224
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 33,179
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 131,006
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 195,449
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 31,767
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 109,707
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 162,927
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 32,183
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 66,445
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 268,367
1.32 UNIÓN REPARACION PVC 4" UN ### 77,587
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 312,359
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 186,383
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 532,995
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ###
i 1,430,788
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 2,114,291
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,086
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,273
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 132,798
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 162,612
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 172,414
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 86,864
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 93,880
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 141,563

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 122,519
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,279,502
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 160,183
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,482,038
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,032,797
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,557
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 121,621
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 287,423
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 287,416
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 461,550
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 121,672
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 121,672
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 287,423
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 287,423
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 461,550
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 461,624
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 750,944
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,205,727
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 74,460
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 385,923
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 434,411
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,201,561
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 70,586
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 349,646
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 53,326
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 75,507
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 109,059
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 167,454
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 269,310
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 389,786
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 493,563
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 649,067
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 893,499

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 759,118
4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 700,168
4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 788,800
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 906,566
4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 997,778
4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 919,903
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,041,910
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,553,649
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,206,000
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,970,982
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,945,707
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,126,623
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y
4.13 DEMOLICIÓN) UN ### 144,271

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 79,209
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 93,613
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 67,484
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 73,413
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 72,882
5.6 BORDE SEPARADOR VERDE A-170 ML ### 270,925
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,896
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 48,111
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ###
i 88,186
p
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### i 590,871
5.11 LOSETA PREFABRICADA A-40 M2 ### o 67,049
5.12 LOSETA PREFABRICADA A-60 M2 ### 97,488
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 38,659
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 64,115
5.15 SARDINEL PREFABRICADO A-10 ML ### 115,306
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 64,106

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 219,299
6.2 BANCA EN CONCRETO M-30 UN ### 714,751
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 227,757
6.4 BOLARDO M-60 CONCRETO UN ### 176,009
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 177,877
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 208,231
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 62,706
6.8 BORDILLO PREFABRICADO A-80 ML ### 73,747
6.9 CANECA M-120 UN ### 331,823
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 876,139
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,597,119
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,700,506
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 518,435
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 691,929
6.15 BANCA EN MADERA M-50 UN ### 567,796
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 263,944
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 613,051
6.18 POSTE HISTÓRICO M-131 UN ### 6,848,993

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,294
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,586
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 332,783
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 526,473
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 246,814
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 262,325
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 274,072
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
7.8 TACHAS REFLECTIVAS UN ###
i 14,306
p
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### i 15,289
o
7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 125,010
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS p 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM) M3 ### 152,777
1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673
1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.4 200.2 DISTANCIA DE 5KM)
HA ### 933,801
1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y
1.6 *** DERRUMBES M3-KM### 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,119
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.9 600.1 KM) M3 ### 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.10 600.2 KM) M3 ### 65,971
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2.11 600.3 5 KM)
M3 ### 80,744
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 600.4 MENOR DE 5 KM) M3 ### 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 600.4 P DISTANCIA MENOR DE 5 KM) M3 ### 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.14 600.5 DISTANCIA MENOR DE 5 KM)
M3 ### 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.15 600.5 P DISTANCIA MENOR DE 5 KM) M3 ### 53,644

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
3.2 320.1 SUBBASE GRANULAR M3 ###
i 216,600
p
3.3 330.1 BASE GRANULAR M3 ### i 246,386
3.4 365.1 EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON M3 ###
o 139,125
CARGUE MENOR A 5 Km)
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,397
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,161
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 244,695
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 72,612
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 669,469
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 696,244
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 734,239
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 703,682
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 260,377
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 404,237
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 372,977
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 40,406
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 180,729
3.15 311.1 AFIRMADO M3 ### 167,354
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,929
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,298
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.18 500.1 UNIÓN
M3 ### 743,998
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.19 500.1 UNIÓN M3 ### 781,749
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.20 500.1 UNIÓN M3 ### 805,995
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E
3.21 *** INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,235
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 121,814

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 1,030,379
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 901,256
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 951,689
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 680,066
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 780,580
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 685,181
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 785,897
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ###
i 844,212
p
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### i 708,886
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### o 892,386
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,202
4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG ### 15,762
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,850
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4.14 621.1 REFUERZO Y ANILLOS) ML ### 2,800,780
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN
4.15 621.1 P CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
ML ### 4,361,397
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,846,049
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 91,751
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 383,298
4.19 632 P BARANDA METÁLICA ML ### 438,687
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,763
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 649,143
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 101,893
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 160,881
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 495,702
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 441,752
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 450,395
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 450,145
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 458,788
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 622,110
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 720,568
4.31 681.1 GAVIÓN M3 ### 211,739
4.32 681.1 GAVIÓN MALLA PVC M3 ### 216,167
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 48,822
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 19,635
4.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 ### 10,607
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 15,177
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 20,471
4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 ### 24,565
4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 ### 31,601
4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,612
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### p 8,687
i
o
4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,033

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,409

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,699

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,892

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,699

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 18,719

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE


4.48 661.1 EMBOQUILLADA
ML ### 665,948
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 402,368
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 933,337
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 232,875
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,670
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 90,969
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 138,659
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 637,416
4.56 682.1 P COLCHONETA RENO M3 ### 227,917
4.57 *** TRINCHO EN MADERA M2 ### 71,885

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,294
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,586
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 88,714
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 73,746
5.5 730.1 DEFENSA METÁLICA ML ### 157,995
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 14,306

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 851
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE
6.2 801.6 DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM UN ### 131,984
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar
i
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES
6.3 801.7 A UNA DISTANCIA DE 5 KM
ML ### p 25,566
i
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### o 8,310
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890
6.6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 16,222
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 26,374
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,829

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO
SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
CONSTRUCCIÓN

2,129,295 2,214,136
1,235,572 1,277,992
14,622 14,622
16,396 16,396
18,937 18,937
69,481 69,481
48,960 49,833
22,664 23,537
80,242 80,242
6,261 6,261
8,882 8,882
6,813 6,813
7,419 7,419
8,964 8,964
9,084 9,084
13,497 13,497
18,477 18,477
27,441 27,441
39,898 39,898
49,367 49,367
40,806 40,806
57,319 57,319
67,872 67,872
83,193 83,193
9,103 9,103
14,736 14,736
22,422 22,422
36,746 36,746
233,157 233,157
1,539 1,539
5,807 5,807
20,960 20,960
11,490 11,490
11,307 11,307
10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
9,803 9,803
15,459 15,459
13,512 13,512
11,490 11,490
963,422 971,953
10,963 10,963
3,971 3,971
2,855,865 2,855,865
262,620 262,620
9,189 9,189

131,186 139,753
207,589 269,856
297,878 297,878
207,425 207,425
23,437 23,437
692,689 779,826
691,820 779,987
643,374 725,930
50,335 50,335
155,339 155,339

195,831 195,831

244,798 244,798

310,715 310,715
109,309 115,109
135,840 144,246
629,225 711,781
93,074 93,074
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
40,219 40,606
211,002 211,389
500,650 526,642
237,760 246,863
271,860 286,561
357,875 382,978
107,123 107,103
1,371,913 1,371,714
120,863 125,137
76,841 79,096
30,197 32,071
48,359 50,232
63,674 66,296
87,073 90,071
119,999 122,622
1,035,053 1,065,025
1,474,901 1,534,845
1,944,680 2,064,568

44,614 44,614
59,099 59,099
856,413 938,970
283,554 338,632
105,683 113,698
124,850 134,468
137,743 150,567
145,380 159,006
167,069 183,901
186,033 205,270
206,528 228,169
104,987 106,219
1,013,198 1,095,754
100,776 101,550
84,488 92,744
95,318 105,417
111,363 124,027
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
751,106 833,663
51,232 53,686
300,644 337,514
4,453 4,453
4,670 4,670
6,449 6,449
899,936 982,492
825,417 915,831
894,760 977,316
874,712 957,268
1,085,901 1,168,458
367,034 464,130

30,739 32,761
51,209 53,232
36,182 36,569
169,418 170,192
45,973 48,427
27,878 28,651
104,909 106,456
96,789 104,968
95,785 95,785
55,816 55,816
92,158 92,158
54,002 54,002
107,465 107,465
62,978 62,978
119,775 119,775
69,133 69,133
42,649 43,426
25,638 26,027
56,002 56,520
33,380 33,640
62,963 63,481
37,534 37,793
104,530 107,122
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
61,344 62,640
39,041 39,559
23,501 23,760
77,990 79,026
46,656 47,174
93,018 93,791
55,847 56,234
192,892 196,520
114,840 116,654
94,779 96,392
56,728 57,534
49,306 50,466
29,752 30,332
35,318 35,836
21,365 21,624
53,804 54,840
32,683 33,201
104,028 105,582
62,762 63,539
75,823 76,859
45,439 45,957
159,768 163,395
96,341 98,154
33,188 33,575
38,003 39,163
64,203 65,750
5,292 5,292
51,581 53,604
10,692 10,692
14,248 14,248
18,654 18,654
26,309 26,309
39,497 39,497
5,256 5,888

16,399 16,399
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
5,860 6,247
7,046 7,433
8,395 8,782
7,173 7,173
14,027 14,027
24,603 25,732
14,896 15,460
21,646 22,735
13,107 13,651
20,712 21,841
12,640 13,204
21,646 22,735
13,107 13,651
22,189 22,994
13,377 13,780
17,975 18,804
10,983 11,397
17,263 18,123
10,627 11,057
22,424 23,513
13,476 14,020
21,491 22,619
13,009 13,574
17,873 18,734
10,914 11,344
22,380 23,509
13,858 14,423

27,588 29,143
88,339 92,429
58,694 58,694
23,174 23,174
36,469 36,469
85,945 85,945
67,170 67,170
38,812 38,812
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
90,102 90,102
107,707 107,707
158,572 158,572
62,190 62,190
86,163 86,163
78,222 78,222
139,912 139,912
81,857 81,857
60,004 60,004
33,684 33,684
61,778 63,712
50,038 50,038
45,840 45,840
38,310 38,310
37,543 37,543
37,831 37,831
53,543 53,543
47,003 47,003
86,426 86,426
160,094 160,094
71,779 71,779
44,139 44,139
34,725 34,725
61,149 61,149
20,709 20,709
25,037 25,037
27,222 27,222
35,212 35,212
23,094 23,094
54,451 54,451
380,467 380,467
423,505 423,505
286,853 286,853
307,131 307,131

494,863 578,931
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
436,935 517,087
437,893 522,492
384,014 465,809
364,938 452,244
341,233 435,501
252,509 305,881
474,915 526,739
430,440 484,198
496,429 546,706
738,329 788,606

130,021 130,021
4,149 4,536
145,014 145,014
178,128 178,128
260,990 260,990
290,616 290,616
320,274 320,274
212,997 212,997
241,564 241,564
355,830 355,830
134,439 134,439
178,717 178,717
198,714 198,714
507,232 507,232
44,262 44,262
27,283 27,283
104,596 104,596
129,571 129,571
100,576 100,576
30,931 30,931
30,931 30,931
29,302 29,302
44,715 44,715
55,535 55,535
67,075 67,075
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
80,780 80,780
382,442 382,442
267,033 267,033
35,338 35,338
45,436 45,436
55,535 55,535
69,961 69,961

80,166 80,166
225,234 225,234
84,532 84,532
150,105 150,105
143,623 143,623
94,270 94,270
222,807 222,807
115,694 115,694
6,919 6,919
103,253 103,253
127,869 127,869
42,551 42,551
575,228 575,228
206,127 206,127
229,944 229,944
523,641 523,641
133,723 133,723
419,905 419,905
6,330 6,330
294,401 294,401
127,576 127,576
90,964 90,964
93,699 93,699

10,989 10,989
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí

12,228 12,228

9,656 9,656

230,334 230,334
279,077 279,077
23,174 23,174
36,469 36,469
34,846 34,846
44,808 44,808
92,760 92,760
231,791 231,791
44,369 44,369
616,334 616,334
1,268,924 1,268,924
36,473 36,473
68,853 68,853
103,054 103,054
87,487 87,487
63,150 63,150
67,332 67,332
85,115 85,115
69,033 69,033
86,876 86,876
93,060 93,060
77,706 77,706
13,112 13,112
18,560 18,560
24,212 24,212
14,895 14,895
8,858 8,858
54,173 54,173
34,575 34,575
11,121 11,121
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
26,617 26,617
37,002 37,002
50,265 50,265
94,480 94,480
114,271 114,271
63,622 63,622
81,219 81,219
196,827 196,827
406,899 406,899
300,226 300,226
18,502 18,502
23,371 23,371
181,907 181,907
297,010 297,010
494,934 494,934
42,805 42,805
50,513 50,513
64,430 64,430
73,436 73,436
94,701 94,701
108,925 108,925
160,806 160,806
64,550 64,550
64,819 64,819
42,079 42,079
52,020 52,020
4,427 4,427
7,001 7,001
1,078,554 1,078,554
821,742 821,742
2,786,337 2,786,337
2,321,755 2,321,755
668,601 668,601
867,424 867,424
336,265 336,265
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
385,757 385,757
61,304 61,304
72,675 72,675
80,562 80,562
95,019 95,019
57,576 57,576
65,684 65,684
150,938 150,938
59,162 59,162
136,113 136,113
81,281 81,281
48,217 48,217
101,319 101,319
432,302 432,302
576,472 576,472
3,735 3,735
4,929 4,929
7,679 7,679
13,726 13,726
288,726 288,726
81,355 81,355
110,519 110,519
44,459 44,459
1,474,559 1,474,559
1,092,411 1,092,411
1,377,528 1,377,528
642,990 642,990
116,555 116,555
539,723 539,723
675,594 675,594
1,786,657 1,786,657
1,315,313 1,315,313

41,318 43,252
41,356 43,289
15,136 15,523
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
28,892 32,760
89,793 93,661
27,673 29,419
61,306 69,486
85,658 98,745
32,122 32,122
23,986 23,986
28,051 28,051
50,108 57,470
58,830 67,828
85,619 99,524
140,383 217,561
152,373 217,516

60,229 61,003
35,788 36,175
68,634 70,567
72,184 74,117
76,712 78,646
79,889 80,662
37,959 38,939
173,923 177,404
47,650 49,998
45,497 45,497
10,497 11,478
10,035 10,035
13,494 13,494
11,061 11,061
18,711 18,711
36,708 36,708
9,482 9,482
78,476 78,476
124,159 126,866
7,701 7,701
33,271 34,045
48,850 48,850
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
56,897 56,897
51,641 51,641
52,143 52,917
58,675 59,449
11,342 11,342
52,228 53,388
21,904 21,904
131,571 131,571
10,297 10,297
23,841 23,841
15,154 15,154
14,711 14,711
8,810 8,810
8,972 8,972
20,138 20,138
18,317 18,317
20,139 20,139
23,282 23,282
69,287 70,060
83,089 83,089
34,880 34,880
13,981 13,981
109,568 109,568
132,232 132,232

78,009 78,009
37,166 37,166
58,384 58,384
71,941 71,941
53,578 53,578
99,901 99,901
52,440 52,440
110,709 110,709
13,925 13,925
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
5,627 5,627
18,479 18,479
25,905 25,905
43,707 43,707

49,987 49,987
85,005 85,005
19,114 19,114
141,945 138,518
123,378 188,729
191,162 235,710
121,092 129,659
158,344 202,892
188,131 232,679

322,892 322,892
956,349 956,349
517,203 517,203
147,920 147,920
208,483 208,483
193,443 193,443
428,790 428,790
1,100,239 1,100,239
310,811 310,811
219,193 219,193
85,850 85,850
266,246 266,246

393,366 393,366

8,681 8,681
3,238 3,238
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
11,458 11,458
44,212 44,212
6,014 6,014
70,416 70,416
3,560 3,560
2,897 2,897
14,464 14,464
4,205 4,205
15,259 15,259
6,068 6,068
6,883 6,883
7,202 7,202
4,496 4,496
16,071 16,071
9,914 9,914
23,373 23,373
2,774 2,774
12,826 12,826
3,453 3,453
13,090 13,090
7,344 7,344
4,592 4,592
22,916 22,916
13,086 13,086
8,052 8,052

6,527,854 6,527,854
11,533,639 11,533,639
3,018,082 3,018,082
9,863,966 9,863,966
9,238,825 9,238,825
2,774 2,774
924,725 924,725
92,618 92,618
1,676,025 1,676,866
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
723,726 744,876

30,826 30,826
46,104 46,104
57,263 57,263
18,432 18,432
22,407 22,407
30,648 30,648
26,988 26,988
28,472 28,472
35,706 35,706
18,765 18,765
24,647 24,647
38,018 38,018
292,505 292,505
336,800 336,800
351,047 351,047
324,903 324,903

237,264 237,264
36,517 36,517
110,280 110,280
276,230 276,230
54,847 54,847
611,317 611,317
1,524,189 1,524,189
45,581 45,581
237,819 237,819
46,039 46,039
3,992 3,992
6,766 6,766
19,195 19,195
25,226 25,226
32,838 32,838
131,173 131,173
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
34,200 34,200
112,266 112,266
192,104 192,104
304,942 304,942
377,425 377,425
413,134 413,134
600,736 600,736
352,641 352,641
111,139 111,139
14,868 14,868
30,437 30,437
5,271 5,271
36,927 36,927
38,629 38,629
39,480 39,480
25,738 25,738
28,537 28,537
29,713 29,713
50,390 50,390
654,881 654,881
335,116 335,116
92,481 92,481
1,929 1,929
8,923 8,923
13,393 13,393
22,420 22,420
4,124 4,124
22,897 22,897
33,535 33,535
20,156 20,156
16,208 16,208
664,025 664,025
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
URBANISMO

9,712 9,712
97,119 97,119
548,328 548,328
1,170,447 1,170,447
133,974 133,974
817,630 817,630
1,760,474 1,760,474
13,749 13,749
17,030 17,030
21,462 21,462
23,519 23,519
28,256 28,256
28,256 28,256
114,598 114,598
132,699 132,699
410,843 410,843
154,334 154,334
254,413 254,413
1,126,719 1,126,719
1,298,260 1,298,260
15,016 15,016
13,224 13,224
33,179 33,179
131,006 131,006
195,449 195,449
31,767 31,767
109,707 109,707
162,927 162,927
32,183 32,183
66,445 66,445
268,367 268,367
77,587 77,587
312,359 312,359
186,383 186,383
532,995 532,995
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
1,430,788 1,430,788
2,114,291 2,114,291

11,086 11,086
25,273 25,273
19,114 19,114
85,792 136,714
136,911 133,484
126,152 134,719
139,131 139,131
116,864 140,893
95,153 145,431

122,519 122,519
1,279,502 1,279,502
160,183 160,183
1,482,038 1,482,038
1,032,797 1,032,797
63,557 63,557
121,621 121,621
287,423 287,423
287,416 287,416
461,550 461,550
121,672 121,672
121,672 121,672
287,423 287,423
287,423 287,423
461,550 461,550
461,624 461,624
750,944 750,944
1,205,727 1,205,727
74,460 74,460
385,923 385,923
434,411 434,411
1,201,561 1,201,561
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
70,108 70,626
349,646 349,646
53,326 53,326
75,507 75,507
109,059 109,059
167,454 167,454
269,310 269,310
389,786 389,786
493,563 493,563
649,067 649,067
893,499 893,499

712,263 763,023
677,427 702,063
757,564 791,403
847,997 911,446
965,755 1,000,446
876,952 923,482
1,022,585 1,043,518
1,493,667 1,558,642
2,084,544 2,216,122
2,769,093 2,987,807
1,945,707 1,945,707
4,126,623 4,126,623
143,343 144,349

76,710 79,417
91,114 93,821
59,557 68,145
65,214 74,097
65,113 73,529
269,997 271,002
18,945 19,975
42,523 48,576
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
87,690 88,228
577,576 591,979
64,925 67,226
95,364 97,665
35,379 38,932
57,477 64,668
108,044 113,755
62,821 64,213

215,395 219,625
709,284 715,206
226,952 227,825
171,323 176,399
173,191 178,267
203,396 208,634
60,793 62,866
71,605 73,926
331,345 331,863
873,796 876,334
3,595,557 3,597,249
3,698,944 3,700,636
516,823 518,569
685,481 692,466
567,796 567,796
261,601 264,139
611,855 613,150
6,837,279 6,849,969

4,294 4,294
45,586 45,586
332,319 332,822
523,249 526,742
246,350 246,853
261,861 262,364
273,608 274,111
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
14,306 14,306
15,289 15,289
125,010 125,010
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
GÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777
53,673 53,673
2,613,971 2,613,971
933,801 933,801
89,524 89,524
1,318 1,318

9,548 9,548
36,119 36,119
8,749 8,749
14,967 14,967
13,068 13,068
7,499 7,499
481 481
12,832 12,832
20,948 20,948
65,971 65,971

80,744 80,744

19,035 19,035

39,738 39,738

31,203 31,203

53,644 53,644

5,366 5,366
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
158,344 202,892
188,131 232,679
139,125 139,125
3,397 3,397
1,161 1,161
232,253 245,731
69,128 72,902
639,814 712,304
666,589 739,079
704,584 777,074
674,027 746,517
178,402 251,603
345,982 390,530
314,721 359,270
40,406 40,406
180,729 180,729
121,092 129,659
12,033 13,003
4,851 5,336
673,737 749,853

708,343 787,866

730,826 812,259

7,235 7,235
153,710 187,055

950,681 1,037,021
822,879 907,787
870,208 958,479
605,340 686,294
702,895 787,055
606,308 691,753
703,901 792,730
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí
765,339 850,784
626,890 715,718
810,389 899,218
12,202 12,202
15,762 15,762
1,850 1,850
2,800,780 2,800,780

4,225,071 4,372,757
1,767,957 1,852,556
91,751 91,751
373,927 384,079
438,687 438,687
17,763 17,763
542,906 632,427
175,833 175,833
137,157 133,994
414,306 502,485
404,996 469,505
413,639 478,148
416,442 477,644
425,085 486,287
545,852 628,465
641,290 727,175
242,185 274,015
246,613 278,443
44,141 49,212
17,295 19,830
10,607 10,607
15,177 15,177
20,471 20,471
24,565 24,565
31,601 31,601
7,612 7,612
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí

8,687 8,687

9,033 9,033

6,409 6,409

9,699 9,699

7,892 7,892

9,699 9,699

18,719 18,719

665,227 666,008
385,322 403,789
933,337 933,337
188,393 196,630
4,670 4,670
90,969 90,969
138,659 138,659
558,138 644,023
258,363 290,193
71,885 71,885

4,294 4,294
45,586 45,586
88,714 88,714
73,746 73,746
155,133 158,233
14,306 14,306

851 851
131,984 131,984
GOBERNACIÓN DE CUNDINAMARCA
CIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: BAJO MAGDALENA
CIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Guaduas Caparrapí

25,566 25,566
8,310 8,310
448,890 448,890
1,804 1,804
16,222 16,222
26,374 26,374
9,829 9,829

ILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO
EÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
p CONSTRUCCIÓN
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ### o2,066,318 2,068,356 2,069,375 2,066,318 2,059,183 2,054,087 2,079,568 2,048,990
1.2 CAMPAMENTO 9 M2 UN ### 1,201,301 1,202,320 1,202,830 1,201,301 1,197,733 1,195,185 1,207,926 1,192,637
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,310 14,310 14,310 14,310 14,310 14,310 14,310 14,310
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,044 16,044 16,044 16,044 16,044 16,044 16,044 16,044
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,546 18,546 18,546 18,546 18,546 18,546 18,546 18,546
1.6 CERCA EN TABLA H=2.30 M ML ### 67,008 67,008 67,008 67,008 67,008 67,008 67,008 67,008
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 47,391 47,413 47,424 47,391 47,313 47,257 47,536 47,201
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,102 22,125 22,136 22,102 22,024 21,968 22,247 21,913
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2### 80,242 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2### 6,261 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2### 8,882 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2### 6,813 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2### 7,419 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2### 8,964 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2### 9,084 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2### 13,497 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2### 18,477 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2### 27,441 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2### 39,898 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2### 49,367 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2### 40,806 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2### 57,319 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2### 67,872 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2### 83,193 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2### 9,103 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2### 14,736 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2### 22,422 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2### 36,746 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3### 233,157 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2### 1,539 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2### 5,807 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2### 11,307 11,307 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2### 10,480 10,480 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2### i 9,803 9,803 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2###
i 15,459 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 926,538 927,259 926,077 925,444 924,762 923,209 925,502 922,650
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS
1.41 DE PRESICIÓN M2### 10,607 10,607 10,607 10,607 10,607 10,607 10,607 10,607
1.42 REPLANTEO MANUAL DE CIMIENTOS M2### 3,831 3,831 3,831 3,831 3,831 3,831 3,831 3,831
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,745,832 2,745,832 2,745,832 2,745,832 2,745,832 2,745,832 2,745,832 2,745,832
1.44 RED TELEFÓNICA PROVISIONAL UN ### 253,517 253,517 253,517 253,517 253,517 253,517 253,517 253,517
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE) M3### 9,189 9,189 9,189 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3### 104,250 109,390 88,829 87,116 81,976 78,549 92,256 71,695
2.2 BASE ARENA CEMENTO 1:20 M3### 259,126 261,508 262,697 259,126 250,793 244,841 274,603 238,889
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3### 297,878 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3### 207,425 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2### 22,604 22,604 22,604 22,604 22,604 22,604 22,604 22,604
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3### 682,422 684,607 685,701 682,422 674,768 669,303 696,634 663,836
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3### 685,903 688,176 689,314 685,903 677,942 672,257 700,684 666,571
2.8 ZAPATAS EN CONCRETO 3500 PSI M3### 638,662 640,791 641,856 638,662 631,208 625,885 652,504 620,561
2.9 PILOTE DE MADERA D=20 CM ML ### 49,919 49,919 49,919 49,919 49,919 49,919 49,919 49,919
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE
2.10 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 153,988 153,988 153,988 153,988 153,988 153,988 153,988 153,988
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE
2.11 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 192,819 192,819 192,819 192,819 192,819 192,819 192,819 192,819
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE
2.12 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 239,778 239,778 239,778 239,778 239,778 239,778 239,778 239,778
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE
2.13 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 302,992 302,992 302,992 302,992 302,992 302,992 302,992 302,992
2.14 PILOTE HINCADO 25X25 ML ### 108,366 108,521 108,599 108,366 107,820 107,431 109,378 107,041
2.15 PILOTE HINCADO 30X30 ML ### 134,473 134,699 134,811 134,473 133,682 133,118 135,941 132,553
2.16 DADOS EN CONCRETO 3500PSI M3### 624,513 626,642 627,707 624,513 617,059 611,736 638,354 606,412
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM) ML ### 92,185 92,185 92,185 92,185 92,185 92,185 92,185 92,185

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### i 39,384 39,398 39,406 39,384 39,332 39,295 39,480 39,258
p
3.2 SIFÓN EN PVC 6" UN ### 203,024
i 203,039 203,046 203,024 202,972 202,935 203,120 202,898
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### o 480,041 484,986 474,658 470,956 468,925 458,626 464,701 456,585
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 232,572 233,174 232,396 231,805 230,984 229,651 232,485 229,015
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 267,400 268,374 267,164 266,196 264,811 262,650 267,438 261,583
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 353,876 355,149 354,089 352,672 350,242 347,333 355,857 345,519
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 105,515 105,565 105,436 105,406 105,416 105,316 105,266 105,316
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,314,414 1,314,911 1,313,618 1,313,319 1,313,419 1,312,424 1,311,926 1,312,424
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 121,376 121,540 121,621 121,376 120,804 120,396 122,439 119,987
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 76,368 76,455 76,498 76,368 76,067 75,851 76,929 75,636
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,883 28,920 28,938 28,883 28,753 28,661 29,123 28,569
3.12 TUBERÍA DRENAJE PVC 160 ML ### 46,300 46,337 46,356 46,300 46,171 46,079 46,541 45,986
3.13 TUBERÍA DRENAJE PVC 200 ML ### 60,843 60,895 60,921 60,843 60,662 60,533 61,180 60,403
3.14 TUBERÍA DRENAJE PVC 250 ML ### 83,179 83,238 83,268 83,179 82,972 82,824 83,563 82,676
3.15 TUBERÍA DRENAJE PVC 315 ML ### 114,757 114,809 114,835 114,757 114,576 114,447 115,094 114,318
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3.16 MATERIAL FILTRANTE) UN ### 987,626 988,217 988,513 987,626 985,556 984,077 991,470 982,599

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE


3.17 MATERIAL FILTRANTE) UN ### 1,401,828 1,403,011 1,403,602 1,401,828 1,397,688 1,394,731 1,409,516 1,391,774

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE


3.18 MATERIAL FILTRANTE) UN ### 1,838,110 1,840,475 1,841,657 1,838,110 1,829,829 1,823,915 1,853,486 1,818,001

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2### 43,093 43,093 43,093 43,093 43,093 43,093 43,093 43,093
4.2 CASETÓN DE LONA 0.80X0.70 M2### 56,952 56,952 56,952 56,952 56,952 56,952 56,952 56,952
4.3 COLUMNAS 3500 PSI M3### 847,298 849,427 850,492 847,298 839,844 834,521 861,139 829,197
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3### 273,658 277,410 273,436 270,733 265,123 260,340 280,078 256,392
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10
4.5 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2### 103,282 103,489 103,592 103,282 102,559 102,042 104,626 101,525
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12
4.6 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2### 121,918 122,166 122,290 121,918 121,050 120,429 123,531 119,809
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO) M2### 136,117 136,448 136,614 136,117 134,960 134,133 138,268 133,306

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN


4.8 REFUERZO)
M2### 143,660 144,011 144,187 143,660 142,430 141,551 145,944 140,672
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN
4.9 REFUERZO)
M2### p 165,105 165,539 165,756 165,105 163,585 162,500 167,927 161,414
i
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN o
4.10 REFUERZO) M2### 183,851 184,347 184,595 183,851 182,114 180,874 187,076 179,633

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN


4.11 REFUERZO) M2### 204,146 204,704 204,983 204,146 202,192 200,797 207,774 199,401
4.12 ENTREPISO VIGUETA PLACA M2### 102,006 102,042 102,060 102,006 101,880 101,790 102,240 101,700
4.13 ESCALERA MACIZA 3500 PSI M3### 998,417 1,000,546 1,001,611 998,417 990,963 985,640 1,012,258 980,316
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2### 97,946 97,977 97,993 97,946 97,835 97,757 98,150 97,678
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2### 83,496 83,709 83,815 83,496 82,751 82,218 84,880 81,686
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2### 94,238 94,498 94,628 94,238 93,326 92,675 95,931 92,023
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2### 110,160 110,486 110,650 110,160 109,016 108,200 112,283 107,383
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3### 744,996 747,125 748,190 744,996 737,542 732,219 758,837 726,895
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI
4.19 (ANCHO 1 M) UN ### 50,847 50,913 50,946 50,847 50,616 50,451 51,275 50,287

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2### 298,551 299,502 299,978 298,551 295,222 292,845 304,733 290,467
4.21 ACERO FIGURADO 37000 PSI KG ### 4,285 4,285 4,285 4,285 4,285 4,285 4,285 4,285
4.22 ACERO FIGURADO 60000 PSI KG ### 4,494 4,494 4,494 4,494 4,494 4,494 4,494 4,494
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,270 6,270 6,270 6,270 6,270 6,270 6,270 6,270
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3### 892,661 894,790 895,855 892,661 885,207 879,884 906,502 874,560
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3### 819,466 821,796 822,962 819,466 811,308 805,483 834,614 799,657
4.26 VIGA AÉREA 3500 PSI M3### 886,923 889,052 890,117 886,923 879,469 874,146 900,764 868,822
4.27 VIGA CINTA 3500 PSI M3### 866,854 868,983 870,048 866,854 859,400 854,077 880,695 848,753
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3### 1,077,599 1,079,728 1,080,793 1,077,599 1,070,145 1,064,821 1,091,440 1,059,497
4.29 BASE EN CONCRETO POBRE 1500 PSI M3### 358,910 361,243 362,409 358,910 350,745 344,913 374,075 339,080

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,973 31,032 31,062 30,973 30,768 30,621 31,355 30,474
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 51,387 51,446 51,475 51,387 51,181 51,035 51,769 50,888
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,859 35,874 35,882 35,859 35,808 35,771 35,956 35,734
5.4 ARCOS EN LADRILLO PRENSADO ML ### 166,867 166,897 166,912 166,867 166,764 166,690 167,060 166,616
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,619 45,685 45,718 45,619 45,389 45,224 46,048 45,059
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,105 28,137 28,152 28,105 27,995 27,916 28,310 27,838
5.7 ENCHAPES LADRILLO PRENSADO M2### 102,819 102,878 102,908 102,819 102,612 102,464 103,204 102,316

5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2### 95,695 95,914 96,024 95,695 94,926 94,376 97,123 93,827

5.9 MURO DRYWALL DOBLE CARA 0.12 M M2### 93,102 93,102 93,102 93,102 93,102 93,102 93,102 93,102
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### i 54,475 54,475 54,475 54,475 54,475 54,475 54,475 54,475
p
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2### i 89,632 89,632 89,632 89,632 89,632 89,632 89,632 89,632
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### o 52,740 52,740 52,740 52,740 52,740 52,740 52,740 52,740
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2### 104,138 104,138 104,138 104,138 104,138 104,138 104,138 104,138
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 61,314 61,314 61,314 61,314 61,314 61,314 61,314 61,314
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2### 115,915 115,915 115,915 115,915 115,915 115,915 115,915 115,915
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 67,202 67,202 67,202 67,202 67,202 67,202 67,202 67,202
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2### 42,204 42,234 42,249 42,204 42,100 42,026 42,398 41,952
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,416 25,431 25,438 25,416 25,364 25,327 25,513 25,290
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2### 54,687 54,707 54,717 54,687 54,618 54,568 54,816 54,519
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,723 32,733 32,738 32,723 32,688 32,663 32,787 32,639
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2### 61,435 61,455 61,465 61,435 61,366 61,317 61,564 61,267
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,770 36,780 36,785 36,770 36,736 36,711 36,835 36,686
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2### 103,688 103,788 103,837 103,688 103,342 103,094 104,333 102,846
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 60,923 60,973 60,998 60,923 60,750 60,626 61,245 60,502
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2### 38,483 38,503 38,513 38,483 38,414 38,365 38,612 38,315
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,223 23,232 23,237 23,223 23,188 23,163 23,287 23,138
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2### 76,678 76,718 76,737 76,678 76,539 76,440 76,936 76,341
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,000 46,020 46,030 46,000 45,931 45,881 46,129 45,832
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2### 90,658 90,689 90,705 90,658 90,548 90,469 90,862 90,390
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 54,667 54,683 54,691 54,667 54,612 54,573 54,770 54,534
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2### 189,684 189,823 189,892 189,684 189,199 188,852 190,586 188,505
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 113,236 113,305 113,340 113,236 112,993 112,820 113,687 112,646
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2### 93,170 93,232 93,262 93,170 92,954 92,800 93,571 92,646

5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 55,923 55,954 55,970 55,923 55,815 55,738 56,124 55,661

5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2### 48,948 48,992 49,015 48,948 48,793 48,682 49,237 48,571
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,573 29,595 29,606 29,573 29,495 29,440 29,717 29,384
5.37 MURO TOLETE COMÚN 0.06 M M2### 34,883 34,903 34,913 34,883 34,814 34,764 35,012 34,714
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,147 21,157 21,162 21,147 21,112 21,088 21,212 21,063
5.39 MURO TOLETE COMÚN 0.12 M M2### 53,090 53,129 53,149 53,090 52,951 52,852 53,347 52,753
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,326 32,346 32,355 32,326 32,256 32,207 32,455 32,157
5.41 MURO TOLETE COMÚN 0.25 M M2### 102,068 102,128 102,158 102,068 101,860 101,712 102,455 101,563
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 61,782 61,812 61,827 61,782 61,678 61,604 61,976 61,530
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2### 74,434 74,474 74,494 74,434 74,296 74,197 74,692 74,097
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
5.44 ML ### p 44,717 44,737 44,747 44,717 44,648 44,598 44,846 44,549
(LINEAL)
i
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2### o 157,977 158,116 158,185 157,977 157,492 157,145 158,879 156,798
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA
5.46 (LINEAL) ML ### 95,407 95,476 95,511 95,407 95,164 94,990 95,857 94,817
5.47 REMATES LADRILLO PRENSADO ML ### 32,705 32,719 32,727 32,705 32,653 32,616 32,801 32,579
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,041 38,085 38,107 38,041 37,885 37,775 38,329 37,664
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 63,906 63,965 63,995 63,906 63,699 63,551 64,291 63,403
5.50 LAVADA DE FACHADA M2### 5,265 5,265 5,265 5,265 5,265 5,265 5,265 5,265
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,753 51,811 51,841 51,753 51,547 51,400 52,134 51,253
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,639 10,639 10,639 10,639 10,639 10,639 10,639 10,639
5.53 ANCLAJE 3/8" L=30CM UN ### 14,081 14,081 14,081 14,081 14,081 14,081 14,081 14,081
5.54 ANCLAJE 1/2" L=50CM UN ### 18,407 18,407 18,407 18,407 18,407 18,407 18,407 18,407
5.55 ANCLAJE 5/8" L=70CM UN ### 25,806 25,806 25,806 25,806 25,806 25,806 25,806 25,806
5.56 ANCLAJE 3/4" L=70CM UN ### 38,533 38,533 38,533 38,533 38,533 38,533 38,533 38,533
5.57 ANCLAJE 1" L= 70CM UN ### 5,208 5,224 5,232 5,208 5,153 5,113 5,311 5,073

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2### 16,246 16,246 16,246 16,246 16,246 16,246 16,246 16,246
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,156 6,171 6,178 6,156 6,104 6,067 6,252 6,030
6.3 FILOS O DILATACIONES S/MURO ML ### 7,342 7,357 7,364 7,342 7,290 7,253 7,438 7,216
6.4 GOTERA EN MORTERO 1:4 ML ### 8,647 8,661 8,669 8,647 8,595 8,558 8,743 8,521
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2### 6,963 6,963 6,963 6,963 6,963 6,963 6,963 6,963
6.6 MALLA BAJO ENTRAMADO M2### 13,823 13,823 13,823 13,823 13,823 13,823 13,823 13,823
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2### 25,377 25,420 25,441 25,377 25,226 25,118 25,657 25,010
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,282 15,304 15,315 15,282 15,207 15,153 15,423 15,099
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2### 22,340 22,381 22,402 22,340 22,194 22,090 22,610 21,986
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,454 13,475 13,485 13,454 13,381 13,329 13,589 13,277
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2### 21,486 21,529 21,550 21,486 21,335 21,227 21,766 21,119
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,027 13,048 13,059 13,027 12,951 12,897 13,167 12,843
6.13 PAÑETE CULATAS 1:4, E=2 CM M2### 22,340 22,381 22,402 22,340 22,194 22,090 22,610 21,986
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,454 13,475 13,485 13,454 13,381 13,329 13,589 13,277
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2### 22,511 22,542 22,557 22,511 22,403 22,327 22,711 22,250

6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,538 13,554 13,561 13,538 13,484 13,446 13,638 13,408

6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2### 18,503 18,535 18,551 18,503 18,392 18,313 18,709 18,234
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,247 11,263 11,271 11,247 11,191 11,152 11,350 11,112
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2### i 17,852 17,885 17,902 17,852 17,737 17,655 18,066 17,573
p
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ###
i 10,922 10,938 10,946 10,922 10,864 10,823 11,028 10,782
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2### o 23,118 23,160 23,180 23,118 22,972 22,868 23,389 22,764
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,823 13,844 13,854 13,823 13,750 13,698 13,958 13,646
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2### 22,264 22,307 22,329 22,264 22,113 22,005 22,544 21,897
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,396 13,417 13,428 13,396 13,320 13,266 13,536 13,212
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2### 18,463 18,496 18,512 18,463 18,348 18,265 18,676 18,183
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,209 11,225 11,234 11,209 11,151 11,110 11,316 11,069
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2### 23,153 23,196 23,218 23,153 23,002 22,894 23,434 22,786
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,245 14,266 14,277 14,245 14,169 14,115 14,385 14,061

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2### 28,579 28,638 28,668 28,579 28,371 28,222 28,965 28,074
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN
7.2 ASFALTO (INCLUYE TELA IMPERMEABLE) M2### 86,359 86,469 86,524 86,359 85,975 85,700 87,073 85,426
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 56,595 56,595 56,595 56,595 56,595 56,595 56,595 56,595
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,526 22,526 22,526 22,526 22,526 22,526 22,526 22,526
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,383 35,383 35,383 35,383 35,383 35,383 35,383 35,383
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 82,721 82,721 82,721 82,721 82,721 82,721 82,721 82,721
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 64,760 64,760 64,760 64,760 64,760 64,760 64,760 64,760
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,636 37,636 37,636 37,636 37,636 37,636 37,636 37,636
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 86,700 86,700 86,700 86,700 86,700 86,700 86,700 86,700
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 103,539 103,539 103,539 103,539 103,539 103,539 103,539 103,539
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 152,197 152,197 152,197 152,197 152,197 152,197 152,197 152,197
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 60,071 60,071 60,071 60,071 60,071 60,071 60,071 60,071
7.13 CANAL PVC AMAZONAS ML ### 83,432 83,432 83,432 83,432 83,432 83,432 83,432 83,432
7.14 CANAL PVC RAINGO ML ### 75,837 75,837 75,837 75,837 75,837 75,837 75,837 75,837
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2### 134,740 134,740 134,740 134,740 134,740 134,740 134,740 134,740
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2### 78,709 78,709 78,709 78,709 78,709 78,709 78,709 78,709
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2### 57,804 57,804 57,804 57,804 57,804 57,804 57,804 57,804
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,870 32,870 32,870 32,870 32,870 32,870 32,870 32,870
7.19 TEJA DE BARRO M2### 62,096 62,170 62,207 62,096 61,837 61,652 62,577 61,468
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2### 48,190 48,190 48,190 48,190 48,190 48,190 48,190 48,190
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2### 44,175 44,175 44,175 44,175 44,175 44,175 44,175 44,175
7.22 TEJA FIBROCEMENTO Nº4 M2### 37,227 37,227 37,227 37,227 37,227 37,227 37,227 37,227
7.23 TEJA FIBROCEMENTO No. 6 M2### 36,453 36,453 36,453 36,453 36,453 36,453 36,453 36,453
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
7.24 TEJA FIBROCEMENTO No. 8 M2### i 36,729 36,729 36,729 36,729 36,729 36,729 36,729 36,729
p
7.25 TEJA TERMOACÚSTICA M2###
i 51,726 51,726 51,726 51,726 51,726 51,726 51,726 51,726
7.26 TEJA PLÁSTICA No.6 M2### o 45,469 45,469 45,469 45,469 45,469 45,469 45,469 45,469
7.27 TEJA ESPAÑOLA ETERNIT M2### 83,253 83,253 83,253 83,253 83,253 83,253 83,253 83,253
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO
7.28 INYECTADO 30MM M2### 153,776 153,776 153,776 153,776 153,776 153,776 153,776 153,776
7.29 TEJA SIN TRASLAPO M2### 69,114 69,114 69,114 69,114 69,114 69,114 69,114 69,114
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2### 43,236 43,236 43,236 43,236 43,236 43,236 43,236 43,236
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2### 33,892 33,892 33,892 33,892 33,892 33,892 33,892 33,892
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2### 59,171 59,171 59,171 59,171 59,171 59,171 59,171 59,171
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,322 20,322 20,322 20,322 20,322 20,322 20,322 20,322
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,462 24,462 24,462 24,462 24,462 24,462 24,462 24,462
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2### 26,517 26,517 26,517 26,517 26,517 26,517 26,517 26,517
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2### 34,161 34,161 34,161 34,161 34,161 34,161 34,161 34,161
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,533 22,533 22,533 22,533 22,533 22,533 22,533 22,533
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 53,060 53,060 53,060 53,060 53,060 53,060 53,060 53,060
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2### 364,486 364,486 364,486 364,486 364,486 364,486 364,486 364,486
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2### 415,137 415,137 415,137 415,137 415,137 415,137 415,137 415,137
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2### 276,675 276,675 276,675 276,675 276,675 276,675 276,675 276,675
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2### 295,688 295,688 295,688 295,688 295,688 295,688 295,688 295,688

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3### 494,840 497,098 498,227 494,840 486,936 481,292 509,518 475,646
8.2 CONCRETO 3500 PSI M3### 433,091 435,158 436,192 433,091 425,854 420,686 446,529 415,517
8.3 CONCRETO 3000 PSI M3### 431,433 433,555 434,617 431,433 424,002 418,696 445,231 413,389
8.4 CONCRETO 2500 PSI M3### 388,291 390,488 391,586 388,291 380,601 375,108 402,572 369,616
8.5 CONCRETO 2000 PSI M3### 364,218 366,451 367,568 364,218 356,402 350,821 378,733 345,238
8.6 CONCRETO 1500 PSI M3### 333,346 335,611 336,743 333,346 325,418 319,756 348,069 314,093
8.7 MORTERO SECO 1:10 M3### 294,284 296,325 297,345 294,284 287,141 282,039 307,550 276,937
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3### 507,943 509,924 510,915 507,943 501,007 496,053 520,824 491,099
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3### 467,268 469,324 470,351 467,268 460,073 454,935 480,630 449,796
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3### 527,040 528,963 529,924 527,040 520,311 515,505 539,537 510,699
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3### 758,440 760,363 761,324 758,440 751,711 746,905 770,937 742,099

9 CARPINTERÍA EN MADERA
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
9.1 BARANDA EN MADERA CEDRO MACHO ML ### i 125,767 125,767 125,767 125,767 125,767 125,767 125,767 125,767
p
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ###
i 4,404 4,419 4,426 4,404 4,352 4,315 4,500 4,278
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2### o 140,665 140,665 140,665 140,665 140,665 140,665 140,665 140,665
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2### 172,342 172,342 172,342 172,342 172,342 172,342 172,342 172,342
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 250,821 250,821 250,821 250,821 250,821 250,821 250,821 250,821
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 279,189 279,189 279,189 279,189 279,189 279,189 279,189 279,189
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 307,590 307,590 307,590 307,590 307,590 307,590 307,590 307,590
9.8 HOJA PUERTA FORTEC 0.81 UN ### 204,317 204,317 204,317 204,317 204,317 204,317 204,317 204,317
9.9 HOJA PUERTA FORTEC 0.91 UN ### 231,644 231,644 231,644 231,644 231,644 231,644 231,644 231,644
9.10 HOJA PUERTA FORTEC 1.50 UN ### 340,950 340,950 340,950 340,950 340,950 340,950 340,950 340,950
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 129,170 129,170 129,170 129,170 129,170 129,170 129,170 129,170
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 171,526 171,526 171,526 171,526 171,526 171,526 171,526 171,526
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 190,654 190,654 190,654 190,654 190,654 190,654 190,654 190,654
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 485,780 485,780 485,780 485,780 485,780 485,780 485,780 485,780
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,949 42,949 42,949 42,949 42,949 42,949 42,949 42,949
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,707 26,707 26,707 26,707 26,707 26,707 26,707 26,707
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2### 101,530 101,530 101,530 101,530 101,530 101,530 101,530 101,530
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 124,241 124,241 124,241 124,241 124,241 124,241 124,241 124,241
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 96,505 96,505 96,505 96,505 96,505 96,505 96,505 96,505
SUMINISTRO E INSTALACIÓN CERRADURA DE POMO
9.20 ENTRADA UN ### 29,883 29,883 29,883 29,883 29,883 29,883 29,883 29,883
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,883 29,883 29,883 29,883 29,883 29,883 29,883 29,883
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,325 28,325 28,325 28,325 28,325 28,325 28,325 28,325
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2### 43,306 43,306 43,306 43,306 43,306 43,306 43,306 43,306
9.24 ESPEJO BISELADO INCOLORO 4 MM M2### 53,657 53,657 53,657 53,657 53,657 53,657 53,657 53,657
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2### 64,696 64,696 64,696 64,696 64,696 64,696 64,696 64,696
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2### 77,806 77,806 77,806 77,806 77,806 77,806 77,806 77,806
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2### 366,787 366,787 366,787 366,787 366,787 366,787 366,787 366,787
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2### 256,387 256,387 256,387 256,387 256,387 256,387 256,387 256,387
9.29 VIDRIO TRANSPARENTE 3 MM M2### 34,336 34,336 34,336 34,336 34,336 34,336 34,336 34,336
9.30 VIDRIO TRANSPARENTE 4 MM M2### 43,996 43,996 43,996 43,996 43,996 43,996 43,996 43,996
9.31 VIDRIO TRANSPARENTE 5 MM M2### 53,657 53,657 53,657 53,657 53,657 53,657 53,657 53,657
9.32 VIDRIO TRANSPARENTE 6 MM M2### 67,456 67,456 67,456 67,456 67,456 67,456 67,456 67,456

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 77,659 77,659 77,659 77,659 77,659 77,659 77,659 77,659
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2### 216,430 216,430 216,430 216,430 216,430 216,430 216,430 216,430
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO i
10.3 DE 1" (INCLUYE ANTICORROSIVO)
ML ### p 82,160 82,160 82,160 82,160 82,160 82,160 82,160 82,160
i
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 146,833
o 146,833 146,833 146,833 146,833 146,833 146,833 146,833
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 139,330 139,330 139,330 139,330 139,330 139,330 139,330 139,330
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2### 91,475 91,475 91,475 91,475 91,475 91,475 91,475 91,475
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 215,695 215,695 215,695 215,695 215,695 215,695 215,695 215,695
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 112,294 112,294 112,294 112,294 112,294 112,294 112,294 112,294
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO
10.10 (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2### 101,203 101,203 101,203 101,203 101,203 101,203 101,203 101,203
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA
10,10(1) CLASICA) H: 2.00 MTS M2### 123,583 123,583 123,583 123,583 123,583 123,583 123,583 123,583
CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC.
10.11 ANTICORROSIVO ML ### 41,675 41,675 41,675 41,675 41,675 41,675 41,675 41,675
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10.12 E=6MM
M2### 552,028 552,028 552,028 552,028 552,028 552,028 552,028 552,028
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2### 198,396 198,396 198,396 198,396 198,396 198,396 198,396 198,396

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA


10.14 ELECTROSTÁTICA M2### 222,394 222,394 222,394 222,394 222,394 222,394 222,394 222,394

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20


10.15 (INCLUYE PUERTAS Y ACCESORIOS) M2### 503,182 503,182 503,182 503,182 503,182 503,182 503,182 503,182

REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.


10.16 ANTICORROSIVO M2### 130,700 130,700 130,700 130,700 130,700 130,700 130,700 130,700

10.17 PUERTA CORTINA INCLUYE ESMALTE M2### 402,651 402,651 402,651 402,651 402,651 402,651 402,651 402,651
SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC.
10.18 ANTICORROSIVO ML ### 6,152 6,152 6,152 6,152 6,152 6,152 6,152 6,152
10.19 VENTANA EN ALUMINIO CORREDIZA M2### 283,012 283,012 283,012 283,012 283,012 283,012 283,012 283,012
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2### 124,472 124,472 124,472 124,472 124,472 124,472 124,472 124,472
10.21 REJILLA PISO 0.30 M M2### 88,041 88,041 88,041 88,041 88,041 88,041 88,041 88,041
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 90,848 90,848 90,848 90,848 90,848 90,848 90,848 90,848
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS
10.23 DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,756 10,756 10,756 10,756 10,756 10,756 10,756 10,756
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO p
C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.24 COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### i 11,940 11,940 11,940 11,940 11,940 11,940 11,940 11,940
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, o
SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR),


PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS,
10.25 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, KG ### 9,481 9,481 9,481 9,481 9,481 9,481 9,481 9,481
TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 225,018 225,018 225,018 225,018 225,018 225,018 225,018 225,018
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 271,641 271,641 271,641 271,641 271,641 271,641 271,641 271,641
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,526 22,526 22,526 22,526 22,526 22,526 22,526 22,526
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,383 35,383 35,383 35,383 35,383 35,383 35,383 35,383
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,918 33,918 33,918 33,918 33,918 33,918 33,918 33,918
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 43,510 43,510 43,510 43,510 43,510 43,510 43,510 43,510
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 89,774 89,774 89,774 89,774 89,774 89,774 89,774 89,774
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 226,411 226,411 226,411 226,411 226,411 226,411 226,411 226,411
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,316 44,316 44,316 44,316 44,316 44,316 44,316 44,316
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 35,670 35,670 35,670 35,670 35,670 35,670 35,670 35,670
11.13 NIPLE PASAMURO 2" UN ### 67,737 67,737 67,737 67,737 67,737 67,737 67,737 67,737
11.14 NIPLE PASAMURO 4" UN ### 101,256 101,256 101,256 101,256 101,256 101,256 101,256 101,256
11.15 PUNTO AGUA CALIENTE CPVC UN ### 85,563 85,563 85,563 85,563 85,563 85,563 85,563 85,563
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 62,280 62,280 62,280 62,280 62,280 62,280 62,280 62,280
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 66,279 66,279 66,279 66,279 66,279 66,279 66,279 66,279
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 83,761 83,761 83,761 83,761 83,761 83,761 83,761 83,761
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 67,597 67,597 67,597 67,597 67,597 67,597 67,597 67,597
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 84,667 84,667 84,667 84,667 84,667 84,667 84,667 84,667
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 90,582 90,582 90,582 90,582 90,582 90,582 90,582 90,582
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 75,184 75,184 75,184 75,184 75,184 75,184 75,184 75,184
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,731 12,731 12,731 12,731 12,731 12,731 12,731 12,731
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,941 17,941 17,941 17,941 17,941 17,941 17,941 17,941
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,422 23,422 23,422 23,422 23,422 23,422 23,422 23,422
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
11.26 RED SUMINISTRO PVC 1" ML ### i 14,457 14,457 14,457 14,457 14,457 14,457 14,457 14,457
p
11.27 RED SUMINISTRO PVC 1/2" ML ###
i 8,629 8,629 8,629 8,629 8,629 8,629 8,629 8,629
11.28 RED SUMINISTRO PVC 2 1/2" ML ### o 52,212 52,212 52,212 52,212 52,212 52,212 52,212 52,212
11.29 RED SUMINISTRO PVC 2" ML ### 33,386 33,386 33,386 33,386 33,386 33,386 33,386 33,386
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,811 10,811 10,811 10,811 10,811 10,811 10,811 10,811
11.31 RED SANITARIA PVC-S 2" ML ### 25,774 25,774 25,774 25,774 25,774 25,774 25,774 25,774
11.32 RED SANITARIA PVC-S 3" ML ### 35,771 35,771 35,771 35,771 35,771 35,771 35,771 35,771
11.33 RED SANITARIA PVC-S 4" ML ### 48,552 48,552 48,552 48,552 48,552 48,552 48,552 48,552
11.34 RED SANITARIA PVC-S 6" ML ### 90,847 90,847 90,847 90,847 90,847 90,847 90,847 90,847
11.35 REGISTRO 1" UN ### 110,247 110,247 110,247 110,247 110,247 110,247 110,247 110,247
11.36 REGISTRO 1/2" UN ### 61,445 61,445 61,445 61,445 61,445 61,445 61,445 61,445
11.37 REGISTRO 3/4" UN ### 78,278 78,278 78,278 78,278 78,278 78,278 78,278 78,278
11.38 REGISTRO 1 1/2" UN ### 189,220 189,220 189,220 189,220 189,220 189,220 189,220 189,220
11.39 REGISTRO 2 1/2" UN ### 390,407 390,407 390,407 390,407 390,407 390,407 390,407 390,407
11.40 REGISTRO 2" UN ### 288,365 288,365 288,365 288,365 288,365 288,365 288,365 288,365
11.41 REVENTILACIÓN 2" ML ### 17,960 17,960 17,960 17,960 17,960 17,960 17,960 17,960
11.42 REVENTILACIÓN 3" ML ### 22,670 22,670 22,670 22,670 22,670 22,670 22,670 22,670
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN) UN ### 176,352 176,352 176,352 176,352 176,352 176,352 176,352 176,352
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11.44 ISNTALACIÓN) UN ### 287,239 287,239 287,239 287,239 287,239 287,239 287,239 287,239
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11.45 INSTALACIÓN) UN ### 478,133 478,133 478,133 478,133 478,133 478,133 478,133 478,133
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE
11.46 ACCESORIOS Y SOPORTES) ML ### 41,349 41,349 41,349 41,349 41,349 41,349 41,349 41,349
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11.47 ACCESORIOS Y SOPORTES) ML ### 48,765 48,765 48,765 48,765 48,765 48,765 48,765 48,765
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE
11.48 ACCESORIOS Y SOPORTES) ML ### 62,497 62,497 62,497 62,497 62,497 62,497 62,497 62,497
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE
11.49 ACCESORIOS Y SOPORTES) ML ### 70,942 70,942 70,942 70,942 70,942 70,942 70,942 70,942
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11.50 ACCESORIOS Y SOPORTES) ML ### 91,431 91,431 91,431 91,431 91,431 91,431 91,431 91,431

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE


11.51 ACCESORIOS Y SOPORTES) ML ### 105,732 105,732 105,732 105,732 105,732 105,732 105,732 105,732

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE


11.52 ACCESORIOS Y SOPORTES) ML ### 156,315 156,315 156,315 156,315 156,315 156,315 156,315 156,315

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,935 62,935 62,935 62,935 62,935 62,935 62,935 62,935
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### i 63,193 63,193 63,193 63,193 63,193 63,193 63,193 63,193
p
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### i 40,806 40,806 40,806 40,806 40,806 40,806 40,806 40,806
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### o 50,316 50,316 50,316 50,316 50,316 50,316 50,316 50,316
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO
11.57 DE HASTA 2" ML ### 4,267 4,267 4,267 4,267 4,267 4,267 4,267 4,267

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO


11.58 MAYOR A 2" ML ### 6,729 6,729 6,729 6,729 6,729 6,729 6,729 6,729
11.59 GABINETE TIPO III UN ### 1,038,997 1,038,997 1,038,997 1,038,997 1,038,997 1,038,997 1,038,997 1,038,997
11.60 GABINETE TIPO I UN ### 793,332 793,332 793,332 793,332 793,332 793,332 793,332 793,332
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,671,359 2,671,359 2,671,359 2,671,359 2,671,359 2,671,359 2,671,359 2,671,359
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,226,943 2,226,943 2,226,943 2,226,943 2,226,943 2,226,943 2,226,943 2,226,943
11.63 VÁLVULA MARIPOSA 3" UN ### 645,587 645,587 645,587 645,587 645,587 645,587 645,587 645,587
11.64 VÁLVULA MARIPOSA 4" UN ### 835,780 835,780 835,780 835,780 835,780 835,780 835,780 835,780
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 322,169 322,169 322,169 322,169 322,169 322,169 322,169 322,169

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 371,867 371,867 371,867 371,867 371,867 371,867 371,867 371,867
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,088 59,088 59,088 59,088 59,088 59,088 59,088 59,088
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 69,964 69,964 69,964 69,964 69,964 69,964 69,964 69,964
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 77,663 77,663 77,663 77,663 77,663 77,663 77,663 77,663
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 91,490 91,490 91,490 91,490 91,490 91,490 91,490 91,490
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,547 55,547 55,547 55,547 55,547 55,547 55,547 55,547
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 63,323 63,323 63,323 63,323 63,323 63,323 63,323 63,323
12.8 STRIP TELEFÓNICO 10 PARES UN ### 146,064 146,064 146,064 146,064 146,064 146,064 146,064 146,064
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 57,039 57,039 57,039 57,039 57,039 57,039 57,039 57,039
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 131,106 131,106 131,106 131,106 131,106 131,106 131,106 131,106
12.11 SALIDA T.V PVC COMPLETA. UN ### 78,400 78,400 78,400 78,400 78,400 78,400 78,400 78,400
12.12 SALIDA BIFÁSICA C.N. UN ### 46,486 46,486 46,486 46,486 46,486 46,486 46,486 46,486
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 97,934 97,934 97,934 97,934 97,934 97,934 97,934 97,934
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 418,108 418,108 418,108 418,108 418,108 418,108 418,108 418,108

12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 557,020 557,020 557,020 557,020 557,020 557,020 557,020 557,020
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,607 3,607 3,607 3,607 3,607 3,607 3,607 3,607
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,762 4,762 4,762 4,762 4,762 4,762 4,762 4,762
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,411 7,411 7,411 7,411 7,411 7,411 7,411 7,411
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,255 13,255 13,255 13,255 13,255 13,255 13,255 13,255
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### p 278,573 278,573 278,573 278,573 278,573 278,573 278,573 278,573
i
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### o 78,672 78,672 78,672 78,672 78,672 78,672 78,672 78,672
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 106,569 106,569 106,569 106,569 106,569 106,569 106,569 106,569
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 43,377 43,377 43,377 43,377 43,377 43,377 43,377 43,377
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,427,092 1,427,092 1,427,092 1,427,092 1,427,092 1,427,092 1,427,092 1,427,092
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,057,537 1,057,537 1,057,537 1,057,537 1,057,537 1,057,537 1,057,537 1,057,537
12.26 POSTE METÁLICO 6M UN ### 1,324,457 1,324,457 1,324,457 1,324,457 1,324,457 1,324,457 1,324,457 1,324,457
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE
12.27 LUMINARIA) UN ### 616,641 616,641 616,641 616,641 616,641 616,641 616,641 616,641
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 112,433 112,433 112,433 112,433 112,433 112,433 112,433 112,433
12.29 LUMINARIA 70W SODIO UN ### 517,408 517,408 517,408 517,408 517,408 517,408 517,408 517,408
12.30 LUMINARIA 150W SODIO UN ### 647,381 647,381 647,381 647,381 647,381 647,381 647,381 647,381
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,710,277 1,710,277 1,710,277 1,710,277 1,710,277 1,710,277 1,710,277 1,710,277
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,259,389 1,259,389 1,259,389 1,259,389 1,259,389 1,259,389 1,259,389 1,259,389

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2### 42,081 42,155 42,192 42,081 41,822 41,637 42,561 41,452
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2### 41,866 41,940 41,977 41,866 41,608 41,423 42,347 41,238
13.3 ALISTADO PARA LISTÓN M2### 15,255 15,270 15,277 15,255 15,203 15,166 15,351 15,129
13.4 ALISTADO PISOS 1:3, E=0.04 M2### 31,743 31,891 31,965 31,743 31,226 30,856 32,705 30,486
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2### 90,202 90,350 90,424 90,202 89,684 89,314 91,163 88,945
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,585 27,629 27,652 27,585 27,428 27,317 27,875 27,205
13.7 CONCRETO BASE GRADAS 2500 PSI M2### 61,631 61,851 61,960 61,631 60,862 60,313 63,059 59,763
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2### 86,183 86,535 86,710 86,183 84,953 84,074 88,468 83,195
13.9 MANTO FIBERGLASS 600X1 M2### 31,096 31,096 31,096 31,096 31,096 31,096 31,096 31,096
13.10 PEGANTE MORTERO-CONCRETO M2### 23,451 23,451 23,451 23,451 23,451 23,451 23,451 23,451
13.11 PERMA PLY 2 CAPAS M2### 27,503 27,503 27,503 27,503 27,503 27,503 27,503 27,503
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2### 50,442 50,639 50,738 50,442 49,750 49,255 51,727 48,761
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2### 59,249 59,491 59,612 59,249 58,403 57,799 60,820 57,195
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2### 86,243 86,617 86,803 86,243 84,936 84,002 88,671 83,068
13.15 TRITURADO FINO 1/2 M3### 118,355 119,878 120,639 118,355 113,024 109,217 128,254 105,410
13.16 TRITURADO GRUESO 3/4 M3### 124,274 127,564 123,040 119,896 115,739 108,506 122,780 105,254

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS

14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2### 59,216 59,246 59,260 59,216 59,113 59,039 59,408 58,965
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA
14.2 ML ### p 35,280 35,295 35,303 35,280 35,229 35,192 35,377 35,155
(LINEAL)
i
14.3 ADOQUÍN CONCRETO 6CM M2### o 68,498 68,572 68,609 68,498 68,240 68,055 68,979 67,870
14.4 ADOQUÍN CONCRETO 8CM M2### 71,898 71,972 72,009 71,898 71,640 71,455 72,379 71,270
14.5 ADOQUÍN GRES PEATONAL M2### 76,297 76,371 76,407 76,297 76,038 75,853 76,777 75,668
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE
14.6 FONDO BLANCO. INCLUYE ALISTADO M2### 77,972 78,002 78,016 77,972 77,868 77,795 78,164 77,721
14.7 GRAVILLA PARA GRADAS ML ### 38,142 38,170 38,184 38,142 38,042 37,972 38,326 37,901
ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y
14.8 PULIDA) M2### 171,230 171,363 171,430 171,230 170,764 170,431 172,095 170,099
14.9 ACABADO EN GRAVILLA LAVADA M2### 48,286 48,358 48,393 48,286 48,036 47,857 48,751 47,679
14.10 GUARDAESCOBA EN GRANITO ML ### 44,740 44,740 44,740 44,740 44,740 44,740 44,740 44,740
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,766 10,795 10,809 10,766 10,667 10,596 10,951 10,525
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,655 9,655 9,655 9,655 9,655 9,655 9,655 9,655
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,965 12,965 12,965 12,965 12,965 12,965 12,965 12,965
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,785 10,785 10,785 10,785 10,785 10,785 10,785 10,785
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,102 18,102 18,102 18,102 18,102 18,102 18,102 18,102
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,318 35,318 35,318 35,318 35,318 35,318 35,318 35,318
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,395 9,395 9,395 9,395 9,395 9,395 9,395 9,395
14.18 LISTÓN M.H. AMARILLO M2### 76,285 76,285 76,285 76,285 76,285 76,285 76,285 76,285
14.19 PASO ESCALERA GRANITO ML ### 123,614 123,718 123,769 123,614 123,252 122,993 124,287 122,734
14.20 PIRLANES ALUMINIO ML ### 7,668 7,668 7,668 7,668 7,668 7,668 7,668 7,668
14.21 PIRLANES LADRILLO ML ### 33,416 33,446 33,461 33,416 33,313 33,239 33,609 33,165
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2### 47,176 47,176 47,176 47,176 47,176 47,176 47,176 47,176
14.23 PISO VINILO TRÁFICO PESADO M2### 54,851 54,851 54,851 54,851 54,851 54,851 54,851 54,851
14.24 PULIDA LACADA PISO MADERA M2### 50,379 50,379 50,379 50,379 50,379 50,379 50,379 50,379
14.25 TABLETA DE GRES 25X25 M2### 51,431 51,460 51,475 51,431 51,327 51,253 51,623 51,179
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2### 57,679 57,708 57,723 57,679 57,575 57,501 57,871 57,427
GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO
14.27 BLANCO ML ### 11,174 11,174 11,174 11,174 11,174 11,174 11,174 11,174
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2### 51,880 51,925 51,947 51,880 51,725 51,614 52,169 51,503
14.29 JABONERA PORCELANA ACUARIO UN ### 21,184 21,184 21,184 21,184 21,184 21,184 21,184 21,184
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 126,874 126,874 126,874 126,874 126,874 126,874 126,874 126,874
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,155 10,155 10,155 10,155 10,155 10,155 10,155 10,155
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,110 23,110 23,110 23,110 23,110 23,110 23,110 23,110
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,800 14,800 14,800 14,800 14,800 14,800 14,800 14,800
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,377 14,377 14,377 14,377 14,377 14,377 14,377 14,377
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
14.35 REMATES BOCEL ALUMINIO ML ### i 8,717 8,717 8,717 8,717 8,717 8,717 8,717 8,717
p
14.36 REMATES BOCEL PORCELANA ML ###
i 8,873 8,873 8,873 8,873 8,873 8,873 8,873 8,873
14.37 TAPA REGISTRO 20X20 UN ### o 19,568 19,568 19,568 19,568 19,568 19,568 19,568 19,568
14.38 TAPA REGISTRO 6X6 UN ### 17,826 17,826 17,826 17,826 17,826 17,826 17,826 17,826
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE
14.39 MÁRMOL N.5
M2### 19,265 19,265 19,265 19,265 19,265 19,265 19,265 19,265
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE
14.40 MÁRMOL FUNDIDO EN SITIO M2### 22,271 22,271 22,271 22,271 22,271 22,271 22,271 22,271

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2### 67,696 67,725 67,740 67,696 67,592 67,518 67,888 67,444
14.42 MEDIA CAÑA EN GRANITO ML ### 79,808 79,808 79,808 79,808 79,808 79,808 79,808 79,808
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2### 34,717 34,717 34,717 34,717 34,717 34,717 34,717 34,717
14.44 PINTURA ACRÍLICA PARA PISOS M2### 13,609 13,609 13,609 13,609 13,609 13,609 13,609 13,609
PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS
14.45 DEPORTIVOS M2### 104,915 104,915 104,915 104,915 104,915 104,915 104,915 104,915

14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2### 126,906 126,906 126,906 126,906 126,906 126,906 126,906 126,906

15 CIELO RASO
15.1 APLIQUE YESO ML ### 74,971 74,971 74,971 74,971 74,971 74,971 74,971 74,971
15.2 ARMADURA MADERA Y MALLA M2### 36,668 36,668 36,668 36,668 36,668 36,668 36,668 36,668
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2### 56,838 56,838 56,838 56,838 56,838 56,838 56,838 56,838
15.4 CIELO RASO DURACUSTIC M2### 69,806 69,806 69,806 69,806 69,806 69,806 69,806 69,806
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2### 52,078 52,078 52,078 52,078 52,078 52,078 52,078 52,078
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2### 96,677 96,677 96,677 96,677 96,677 96,677 96,677 96,677
15.7 CORNISAS YESO ML ### 50,338 50,338 50,338 50,338 50,338 50,338 50,338 50,338
LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE
15.8 APOYO) M2### 106,918 106,918 106,918 106,918 106,918 106,918 106,918 106,918
15.9 MALLA CON VENA M2### 13,725 13,725 13,725 13,725 13,725 13,725 13,725 13,725

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3### 5,627 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE
16.2 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 18,479 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3### 25,905 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M
16.4 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3### 43,707 43,707 43,707 43,707 43,707 43,707 43,707 43,707
DE 5 KM)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M i
16.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3### p 49,987 49,987 49,987 49,987 49,987 49,987 49,987 49,987
DE 5 KM) i
o
EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN
16.6 EXPLOSIVOS) M3### 85,005 85,005 85,005 85,005 85,005 85,005 85,005 85,005

RELLENO CON MATERIAL DEL SITIO COMPACTADO


16.7 MECÁNICAMENTE M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114 19,114

RELLENO EN RECEBO COMÚN COMPACTADO


16.8 MECÁNICAMENTE M3### 104,647 113,214 90,939 85,799 87,513 70,379 61,812 70,379

16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3### 117,553 119,045 119,790 117,553 112,334 108,605 127,248 104,876
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3### 184,461 193,028 174,181 169,041 163,901 146,767 165,614 155,334
16.11 AFRIMADO (NORMA INVIAS 311) M3### 94,156 99,296 78,735 77,022 71,882 68,455 82,162 61,601
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3### 147,202 154,055 135,208 131,781 126,641 109,507 128,354 118,074
16.13 BASE GRANULAR (NORMA INVIAS 330) M3### 181,431 189,998 171,150 166,010 160,870 143,736 162,583 152,303

17 APARATOS SANITARIOS
SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE
17.1 GRIFERÍA) UN ### 310,749 310,749 310,749 310,749 310,749 310,749 310,749 310,749
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO
17.2 (INCLUYE GRIFERÍA) UN ### 916,918 916,918 916,918 916,918 916,918 916,918 916,918 916,918
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE
17.3 GRIFERÍA)
UN ### 496,626 496,626 496,626 496,626 496,626 496,626 496,626 496,626
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE
17.4 GRIFERÍA) UN ### 143,580 143,580 143,580 143,580 143,580 143,580 143,580 143,580
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL
17.5 (INCLUYE GRIFERÍA) UN ### 201,307 201,307 201,307 201,307 201,307 201,307 201,307 201,307
SUMINISTRO E INSTALACIÓN LAVAMANOS DE
17.6 EMPOTRAR(INCLUYE GRIFERÍA) UN ### 186,919 186,919 186,919 186,919 186,919 186,919 186,919 186,919
SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE
17.7 GRIFERÍA) UN ### 412,050 412,050 412,050 412,050 412,050 412,050 412,050 412,050
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO
17.8 (INCLUYE GRIFERÍA)
UN ### 1,054,562 1,054,562 1,054,562 1,054,562 1,054,562 1,054,562 1,054,562 1,054,562
SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE
17.9 GRIFERÍA) UN ### 299,192 299,192 299,192 299,192 299,192 299,192 299,192 299,192
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN
17.10 SALIDA A BAÑERA UN ### 211,759 211,759 211,759 211,759 211,759 211,759 211,759 211,759
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### p 83,996 83,996 83,996 83,996 83,996 83,996 83,996 83,996
i
o
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN
17.12 ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y UN ### 256,563 256,563 256,563 256,563 256,563 256,563 256,563 256,563
GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER


17.13 EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y UN ### 378,166 378,166 378,166 378,166 378,166 378,166 378,166 378,166
GRIFERÍA)

18 PINTURAS
IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O
18.1 SIMILAR M2### 8,506 8,506 8,506 8,506 8,506 8,506 8,506 8,506
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,158 3,158 3,158 3,158 3,158 3,158 3,158 3,158
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2### 11,306 11,306 11,306 11,306 11,306 11,306 11,306 11,306
18.4 BARNIZ SOBRE MUEBLES M2### 43,140 43,140 43,140 43,140 43,140 43,140 43,140 43,140
18.5 CARBURO SOBRE PAÑETES M2### 5,928 5,928 5,928 5,928 5,928 5,928 5,928 5,928
18.6 COLORPLAST FACHADA SOBRE FACHADA M2### 67,593 67,593 67,593 67,593 67,593 67,593 67,593 67,593
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,522 3,522 3,522 3,522 3,522 3,522 3,522 3,522
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,831 2,831 2,831 2,831 2,831 2,831 2,831 2,831
18.9 ESMALTE SOBRE LÁMINA LLENA M2### 14,195 14,195 14,195 14,195 14,195 14,195 14,195 14,195
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,115 4,115 4,115 4,115 4,115 4,115 4,115 4,115
18.11 ESMALTE SOBRE MADERA LLENA M2### 14,969 14,969 14,969 14,969 14,969 14,969 14,969 14,969
18.12 ESMALTE SOBRE MARCOS LÁMINA M2### 5,882 5,882 5,882 5,882 5,882 5,882 5,882 5,882
18.13 ESMALTE SOBRE MARCOS MADERA M2### 6,688 6,688 6,688 6,688 6,688 6,688 6,688 6,688
18.14 ESTUCO M2### 7,122 7,122 7,122 7,122 7,122 7,122 7,122 7,122
18.15 ESTUCO (LINEAL) ML ### 4,456 4,456 4,456 4,456 4,456 4,456 4,456 4,456
18.16 ESTUCO Y VINILO 3 MANOS M2### 15,793 15,793 15,793 15,793 15,793 15,793 15,793 15,793
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,775 9,775 9,775 9,775 9,775 9,775 9,775 9,775
18.18 LACA PISOS MADERA M2### 23,102 23,102 23,102 23,102 23,102 23,102 23,102 23,102
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,731 2,731 2,731 2,731 2,731 2,731 2,731 2,731
18.20 MARMOLINA SOBRE PAÑETE M2### 12,456 12,456 12,456 12,456 12,456 12,456 12,456 12,456
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,359 3,359 3,359 3,359 3,359 3,359 3,359 3,359
18.22 TINTILLA SOBRE MADERA LLENA M2### 12,832 12,832 12,832 12,832 12,832 12,832 12,832 12,832
18.23 VINILO SOBRE PAÑETE 2 MANOS M2### 7,211 7,211 7,211 7,211 7,211 7,211 7,211 7,211
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,526 4,526 4,526 4,526 4,526 4,526 4,526 4,526
18.25 WASH-PRIMER SOBRE ALUMNIO M2### 22,294 22,294 22,294 22,294 22,294 22,294 22,294 22,294
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
18.26 PINTURA EPÓXICA M2### i 12,891 12,891 12,891 12,891 12,891 12,891 12,891 12,891
p
18.27 PINTURA EPÓXICA (LINEAL) ML ###
i 7,955 7,955 7,955 7,955 7,955 7,955 7,955 7,955
o
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,247,372 6,247,372 6,247,372 6,247,372 6,247,372 6,247,372 6,247,372 6,247,372
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### ### 11,038,120 ### 11,038,120 ### 11,038,120 11,038,120 ###
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,888,629 2,888,629 2,888,629 2,888,629 2,888,629 2,888,629 2,888,629 2,888,629
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO
19.4 (PAR) UN ### 9,440,373 9,440,373 9,440,373 9,440,373 9,440,373 9,440,373 9,440,373 9,440,373
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,840,971 8,840,971 8,840,971 8,840,971 8,840,971 8,840,971 8,840,971 8,840,971
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,731 2,731 2,731 2,731 2,731 2,731 2,731 2,731
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 886,184 886,184 886,184 886,184 886,184 886,184 886,184 886,184
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 88,598 88,598 88,598 88,598 88,598 88,598 88,598 88,598
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,604,566 1,604,589 1,604,600 1,604,566 1,604,487 1,604,431 1,604,713 1,604,375
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 700,381 700,911 701,177 700,381 698,523 697,196 703,830 695,870

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,985 29,985 29,985 29,985 29,985 29,985 29,985 29,985
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,652 44,652 44,652 44,652 44,652 44,652 44,652 44,652
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 55,393 55,393 55,393 55,393 55,393 55,393 55,393 55,393
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20.4 ACCESORIOS) ML ### 17,978 17,978 17,978 17,978 17,978 17,978 17,978 17,978

TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE


20.5 ACCESORIOS) ML ### 21,805 21,805 21,805 21,805 21,805 21,805 21,805 21,805

TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE


20.6 ACCESORIOS) ML ### 29,762 29,762 29,762 29,762 29,762 29,762 29,762 29,762
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,501 26,501 26,501 26,501 26,501 26,501 26,501 26,501
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,946 27,946 27,946 27,946 27,946 27,946 27,946 27,946
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,978 34,978 34,978 34,978 34,978 34,978 34,978 34,978
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,098 18,098 18,098 18,098 18,098 18,098 18,098 18,098
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,738 23,738 23,738 23,738 23,738 23,738 23,738 23,738
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,545 36,545 36,545 36,545 36,545 36,545 36,545 36,545
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 280,488 280,488 280,488 280,488 280,488 280,488 280,488 280,488
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 322,860 322,860 322,860 322,860 322,860 322,860 322,860 322,860
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 336,662 336,662 336,662 336,662 336,662 336,662 336,662 336,662
20.16 ACOMETIDA GAS 1/2" ML ### 312,081 312,081 312,081 312,081 312,081 312,081 312,081 312,081
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
21.1 INSTALACIONES RED VOZ Y DATOS i
p
21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 227,851
i 227,851 227,851 227,851 227,851 227,851 227,851 227,851
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### o 34,967 34,967 34,967 34,967 34,967 34,967 34,967 34,967
21.3 SIRENA DE 110 V UN ### 106,231 106,231 106,231 106,231 106,231 106,231 106,231 106,231
21.4 CÁMARA CCTV UN ### 268,666 268,666 268,666 268,666 268,666 268,666 268,666 268,666
21.5 PARLANTE-CIELO FALSO UN ### 53,204 53,204 53,204 53,204 53,204 53,204 53,204 53,204
21.6 AMPLIFICADOR 100W UN ### 588,470 588,470 588,470 588,470 588,470 588,470 588,470 588,470
21.7 AMPLIFICADOR 300W UN ### 1,461,570 1,461,570 1,461,570 1,461,570 1,461,570 1,461,570 1,461,570 1,461,570
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,305 45,305 45,305 45,305 45,305 45,305 45,305 45,305
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 228,049 228,049 228,049 228,049 228,049 228,049 228,049 228,049
21.10 TOMA PARA MICRÓFONO UN ### 44,886 44,886 44,886 44,886 44,886 44,886 44,886 44,886
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,856 3,856 3,856 3,856 3,856 3,856 3,856 3,856
21.12 SPLITERS UN ### 6,494 6,494 6,494 6,494 6,494 6,494 6,494 6,494
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,914 18,914 18,914 18,914 18,914 18,914 18,914 18,914
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,807 24,807 24,807 24,807 24,807 24,807 24,807 24,807
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 32,232 32,232 32,232 32,232 32,232 32,232 32,232 32,232
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 126,130 126,130 126,130 126,130 126,130 126,130 126,130 126,130
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO
21.17 30X120 ML ### 32,900 32,900 32,900 32,900 32,900 32,900 32,900 32,900
21.18 BANDEJA PORTACABLES PARA RACK UN ### 107,709 107,709 107,709 107,709 107,709 107,709 107,709 107,709
21.19 RACK 2' X 24" UN ### 187,454 187,454 187,454 187,454 187,454 187,454 187,454 187,454
21.20 RACK 3' X 24" UN ### 295,394 295,394 295,394 295,394 295,394 295,394 295,394 295,394
21.21 RACK 5' X 24" UN ### 366,576 366,576 366,576 366,576 366,576 366,576 366,576 366,576
21.22 RACK 7' X 24" UN ### 400,734 400,734 400,734 400,734 400,734 400,734 400,734 400,734
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 585,726 585,726 585,726 585,726 585,726 585,726 585,726 585,726
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 344,712 344,712 344,712 344,712 344,712 344,712 344,712 344,712
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y
21.25 MARCACIÓN) UN ### 106,897 106,897 106,897 106,897 106,897 106,897 106,897 106,897
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,255 14,255 14,255 14,255 14,255 14,255 14,255 14,255
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,148 29,148 29,148 29,148 29,148 29,148 29,148 29,148
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,116 5,116 5,116 5,116 5,116 5,116 5,116 5,116
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,985 35,985 35,985 35,985 35,985 35,985 35,985 35,985
21.30 CANALETA METÁLICA 4X10 CMS ML ### 37,614 37,614 37,614 37,614 37,614 37,614 37,614 37,614
21.31 CANALETA METÁLICA 6X10 CMS ML ### 38,428 38,428 38,428 38,428 38,428 38,428 38,428 38,428
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,063 25,063 25,063 25,063 25,063 25,063 25,063 25,063
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,742 27,742 27,742 27,742 27,742 27,742 27,742 27,742
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,867 28,867 28,867 28,867 28,867 28,867 28,867 28,867
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
21.35 CANALETA PLÁSTICA 40X60 MM ML ### i 48,645 48,645 48,645 48,645 48,645 48,645 48,645 48,645
p
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 630,143
i 630,143 630,143 630,143 630,143 630,143 630,143 630,143
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### o 323,337 323,337 323,337 323,337 323,337 323,337 323,337 323,337
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 90,311 90,311 90,311 90,311 90,311 90,311 90,311 90,311
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,876 1,876 1,876 1,876 1,876 1,876 1,876 1,876
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,668 8,668 8,668 8,668 8,668 8,668 8,668 8,668
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,950 12,950 12,950 12,950 12,950 12,950 12,950 12,950
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,631 21,631 21,631 21,631 21,631 21,631 21,631 21,631
21.43 CABLE TELEVISIÓN RG6 ML ### 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,641 22,641 22,641 22,641 22,641 22,641 22,641 22,641
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 33,001 33,001 33,001 33,001 33,001 33,001 33,001 33,001
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,723 19,723 19,723 19,723 19,723 19,723 19,723 19,723
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN) ML ### 15,727 15,727 15,727 15,727 15,727 15,727 15,727 15,727

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 636,782 636,782 636,782 636,782 636,782 636,782 636,782 636,782
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### o 9,712 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 93,196 93,196 93,196 93,196 93,196 93,196 93,196 93,196
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 525,112 525,112 525,112 525,112 525,112 525,112 525,112 525,112
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,120,811 1,120,811 1,120,811 1,120,811 1,120,811 1,120,811 1,120,811 1,120,811
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 128,452 128,452 128,452 128,452 128,452 128,452 128,452 128,452
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 782,724 782,724 782,724 782,724 782,724 782,724 782,724 782,724
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,684,642 1,684,642 1,684,642 1,684,642 1,684,642 1,684,642 1,684,642 1,684,642
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,386 13,386 13,386 13,386 13,386 13,386 13,386 13,386
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,525 16,525 16,525 16,525 16,525 16,525 16,525 16,525
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,764 20,764 20,764 20,764 20,764 20,764 20,764 20,764
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,732 22,732 22,732 22,732 22,732 22,732 22,732 22,732
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,264 27,264 27,264 27,264 27,264 27,264 27,264 27,264
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,264 27,264 27,264 27,264 27,264 27,264 27,264 27,264
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 109,799 109,799 109,799 109,799 109,799 109,799 109,799 109,799
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 127,172 127,172 127,172 127,172 127,172 127,172 127,172 127,172
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 393,595 393,595 393,595 393,595 393,595 393,595 393,595 393,595
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 147,810 147,810 147,810 147,810 147,810 147,810 147,810 147,810
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 243,663 243,663 243,663 243,663 243,663 243,663 243,663 243,663
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,078,396 1,078,396 1,078,396 1,078,396 1,078,396 1,078,396 1,078,396 1,078,396
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,242,492 1,242,492 1,242,492 1,242,492 1,242,492 1,242,492 1,242,492 1,242,492
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,540 14,540 14,540 14,540 14,540 14,540 14,540 14,540
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,825 12,825 12,825 12,825 12,825 12,825 12,825 12,825
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,762 31,762 31,762 31,762 31,762 31,762 31,762 31,762
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 125,905 125,905 125,905 125,905 125,905 125,905 125,905 125,905
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 187,550 187,550 187,550 187,550 187,550 187,550 187,550 187,550
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,621 30,621 30,621 30,621 30,621 30,621 30,621 30,621
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 105,530 105,530 105,530 105,530 105,530 105,530 105,530 105,530
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 156,439 156,439 156,439 156,439 156,439 156,439 156,439 156,439
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,962 30,962 30,962 30,962 30,962 30,962 30,962 30,962
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 63,853 63,853 63,853 63,853 63,853 63,853 63,853 63,853
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 257,304 257,304 257,304 257,304 257,304 257,304 257,304 257,304
1.32 UNIÓN REPARACION PVC 4" UN ### 74,512 74,512 74,512 74,512 74,512 74,512 74,512 74,512
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 299,386 299,386 299,386 299,386 299,386 299,386 299,386 299,386
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### i 179,346 179,346 179,346 179,346 179,346 179,346 179,346 179,346
p
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 510,899
i 510,899 510,899 510,899 510,899 510,899 510,899 510,899
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### o1,369,010 1,369,010 1,369,010 1,369,010 1,369,010 1,369,010 1,369,010 1,369,010
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,022,891 2,022,891 2,022,891 2,022,891 2,022,891 2,022,891 2,022,891 2,022,891

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2### 10,909 10,909 10,909 10,909 10,909 10,909 10,909 10,909
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2### 24,915 24,915 24,915 24,915 24,915 24,915 24,915 24,915
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3### 95,488 96,874 97,568 95,488 90,635 87,169 104,500 83,703
2.5 RELLENO TIPO 2 "RECEBO" M3### 99,612 108,179 85,905 80,765 82,478 65,344 56,777 65,344
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3### 99,216 104,356 83,795 82,082 76,942 73,515 87,222 66,661
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3### 116,391 122,540 111,267 109,217 106,142 98,969 106,142 99,993
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3### 83,673 89,941 78,449 76,359 73,225 69,046 79,494 66,957
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3### 139,885 141,808 142,768 139,885 133,156 128,350 152,382 123,544

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 117,376 117,376 117,376 117,376 117,376 117,376 117,376 117,376
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,224,198 1,224,198 1,224,198 1,224,198 1,224,198 1,224,198 1,224,198 1,224,198
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 153,406 153,406 153,406 153,406 153,406 153,406 153,406 153,406
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,417,942 1,417,942 1,417,942 1,417,942 1,417,942 1,417,942 1,417,942 1,417,942
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 988,259 988,259 988,259 988,259 988,259 988,259 988,259 988,259
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,961 62,961 62,961 62,961 62,961 62,961 62,961 62,961
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 116,517 116,517 116,517 116,517 116,517 116,517 116,517 116,517
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 275,181 275,181 275,181 275,181 275,181 275,181 275,181 275,181
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 275,175 275,175 275,175 275,175 275,175 275,175 275,175 275,175
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 441,808 441,808 441,808 441,808 441,808 441,808 441,808 441,808
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 116,566 116,566 116,566 116,566 116,566 116,566 116,566 116,566
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 116,566 116,566 116,566 116,566 116,566 116,566 116,566 116,566
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 275,181 275,181 275,181 275,181 275,181 275,181 275,181 275,181
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 275,181 275,181 275,181 275,181 275,181 275,181 275,181 275,181
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 441,808 441,808 441,808 441,808 441,808 441,808 441,808 441,808
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 443,352 443,352 443,352 443,352 443,352 443,352 443,352 443,352
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 720,114 720,114 720,114 720,114 720,114 720,114 720,114 720,114
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,155,829 1,155,829 1,155,829 1,155,829 1,155,829 1,155,829 1,155,829 1,155,829
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 71,412 71,412 71,412 71,412 71,412 71,412 71,412 71,412
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 370,937 370,937 370,937 370,937 370,937 370,937 370,937 370,937
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24"
i
ML ### 416,142 416,142 416,142 416,142 416,142 416,142 416,142 416,142
p
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### i 1,151,693 1,151,693 1,151,693 1,151,693 1,151,693 1,151,693 1,151,693 1,151,693
o
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 67,785 67,805 67,815 67,785 67,716 67,666 67,914 67,617
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 336,235 336,235 336,235 336,235 336,235 336,235 336,235 336,235
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 51,182 51,182 51,182 51,182 51,182 51,182 51,182 51,182
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 72,402 72,402 72,402 72,402 72,402 72,402 72,402 72,402
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 104,501 104,501 104,501 104,501 104,501 104,501 104,501 104,501
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 160,420 160,420 160,420 160,420 160,420 160,420 160,420 160,420
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 257,854 257,854 257,854 257,854 257,854 257,854 257,854 257,854
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 374,010 374,010 374,010 374,010 374,010 374,010 374,010 374,010
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 473,340 473,340 473,340 473,340 473,340 473,340 473,340 473,340
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 622,382 622,382 622,382 622,382 622,382 622,382 622,382 622,382
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 856,203 856,203 856,203 856,203 856,203 856,203 856,203 856,203

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000
4.1 PSI CON REFUERZO) UN ### 696,788 698,061 698,699 696,788 692,330 689,146 705,067 685,962
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M
4.2 (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 679,545 680,487 680,958 679,545 676,248 673,893 685,668 671,538
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
4.3 REFUERZO (INCLUYE ARO Y TAPA HF)
UN ### 736,679 737,527 737,952 736,679 733,706 731,584 742,198 729,461

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000


4.4 PSI CON REFUERZO) UN ### 828,913 830,505 831,301 828,913 823,340 819,360 839,262 815,380

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M


4.5 (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML ### 965,763 967,090 967,753 965,763 961,120 957,804 974,386 954,488
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4.6 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 853,074 854,242 854,826 853,074 848,987 846,069 860,663 843,150
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,014,239 1,014,883 1,015,206 1,014,239 1,011,978 1,010,364 1,018,434 1,008,750
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,484,412 1,486,252 1,487,175 1,484,412 1,477,958 1,473,351 1,496,392 1,468,742
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,047,037 2,050,428 2,052,124 2,047,037 2,035,165 2,026,688 2,069,081 2,018,209
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,731,239 2,736,876 2,739,695 2,731,239 2,711,505 2,697,413 2,767,882 2,683,318
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,871,384 1,871,384 1,871,384 1,871,384 1,871,384 1,871,384 1,871,384 1,871,384
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,961,240 3,961,240 3,961,240 3,961,240 3,961,240 3,961,240 3,961,240 3,961,240
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN) UN ### 141,155 141,193 141,213 141,155 141,020 140,924 141,405 140,828

5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2### i 76,830 76,934 76,985 76,830 76,468 76,209 77,503 75,950
p
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2###
i 90,662 90,766 90,817 90,662 90,300 90,041 91,335 89,782
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2### o 59,846 60,077 60,192 59,846 59,039 58,462 61,346 57,886
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2### 64,376 64,599 64,711 64,376 63,596 63,039 65,825 62,482
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2### 64,550 64,768 64,876 64,550 63,791 63,248 65,961 62,705
5.6 BORDE SEPARADOR VERDE A-170 ML ### 259,827 259,865 259,885 259,827 259,692 259,596 260,077 259,500
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,929 18,956 18,970 18,929 18,832 18,763 19,109 18,693

5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 42,770 42,932 43,014 42,770 42,201 41,794 43,827 41,388
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 85,250 85,270 85,280 85,250 85,178 85,126 85,383 85,075
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 571,664 572,161 572,410 571,664 569,923 568,680 574,897 567,437
5.11 LOSETA PREFABRICADA A-40 M2### 65,180 65,268 65,312 65,180 64,872 64,652 65,752 64,432
5.12 LOSETA PREFABRICADA A-60 M2### 94,067 94,155 94,199 94,067 93,759 93,539 94,639 93,319
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE
5.13 3000 PSI ML ### 34,942 35,031 35,075 34,942 34,629 34,407 35,521 34,184

SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO


5.14 3000 PSI ML ### 56,762 56,942 57,032 56,762 56,130 55,679 57,934 55,228
5.15 SARDINEL PREFABRICADO A-10 ML ### 105,423 106,438 104,259 103,632 102,963 100,921 103,367 101,865
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2### 62,196 62,250 62,276 62,196 62,010 61,877 62,542 61,744

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 208,024 208,130 208,183 208,024 207,652 207,387 208,714 207,122
6.2 BANCA EN CONCRETO M-30 UN ### 681,503 681,652 681,726 681,503 680,983 680,612 682,469 680,240
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 218,873 218,895 218,906 218,873 218,795 218,739 219,018 218,683
6.4 BOLARDO M-60 CONCRETO UN ### 166,261 166,388 166,452 166,261 165,815 165,497 167,089 165,178
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 168,128 168,256 168,320 168,128 167,683 167,364 168,956 167,046
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 197,096 197,230 197,297 197,096 196,627 196,292 197,967 195,957
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 61,313 61,392 61,432 61,313 61,035 60,837 61,828 60,639
6.8 BORDILLO PREFABRICADO A-80 ML ### 71,202 71,291 71,336 71,202 70,892 70,670 71,779 70,448
6.9 CANECA M-120 UN ### 318,370 318,390 318,400 318,370 318,301 318,251 318,499 318,202
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 839,081 839,145 839,177 839,081 838,858 838,699 839,495 838,540
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,443,277 3,443,320 3,443,341 3,443,277 3,443,129 3,443,022 3,443,553 3,442,916
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,542,177 3,542,220 3,542,241 3,542,177 3,542,029 3,541,922 3,542,453 3,541,816
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 495,592 495,637 495,659 495,592 495,436 495,325 495,883 495,213
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 658,095 658,273 658,363 658,095 657,469 657,023 659,256 656,576
6.15 BANCA EN MADERA M-50 UN ### 544,569 544,569 544,569 544,569 544,569 544,569 544,569 544,569
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### i 252,778 252,841 252,873 252,778 252,555 252,395 253,192 252,236
p
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 587,508
i 587,558 587,583 587,508 587,335 587,211 587,830 587,087
6.18 POSTE HISTÓRICO M-131 UN ### o6,548,636 6,548,955 6,549,114 6,548,636 6,547,522 6,546,726 6,550,706 6,545,930

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,113 4,113 4,113 4,113 4,113 4,113 4,113 4,113
7.2 MARCA VIAL CON PINTURA EN FRÍO M2### 44,032 44,032 44,032 44,032 44,032 44,032 44,032 44,032
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 319,585 319,604 319,613 319,585 319,517 319,469 319,710 319,421
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 503,803 503,892 503,937 503,803 503,490 503,267 504,383 503,043
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 238,678 238,697 238,707 238,678 238,610 238,562 238,803 238,514
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 253,516 253,535 253,545 253,516 253,448 253,400 253,641 253,352
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 264,753 264,772 264,782 264,753 264,685 264,637 264,878 264,589
7.8 TACHAS REFLECTIVAS UN ### 13,778 13,778 13,778 13,778 13,778 13,778 13,778 13,778
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,716 14,716 14,716 14,716 14,716 14,716 14,716 14,716

TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M


7.10 (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 119,911 119,911 119,911 119,911 119,911 119,911 119,911 119,911
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
VÍASp (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
NORMA PRELIMILARES i
1 INV o
1.1 201 P DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3### 152,777 152,777 152,777 152,777 152,777 152,777 152,777 152,777

1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO


DE SOBRANTES A UNA DISTANCIA DE 5KM) M3### 53,673 53,673 53,673 53,673 53,673 53,673 53,673 53,673

1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y


RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971

1.4 200.2 DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE


CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801 933,801

1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO


DE SOBRANTES A UNA DISTANCIA DE 5KM)
M3### 89,524 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN,
1.6 *** CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318 1,318

NORMA EXPLANACIÓN Y EXCAVACIONES


2 INV

2.1 210.1.1 EXCAVACIÓN


PRÉSTAMOS
SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y M3### 9,548 9,548 9,548 9,548 9,548 9,548 9,548 9,548

2.2 210.2.1 EXCAVACIÓN


PRÉSTAMOS
EN ROCA DE LA EXPLANACIÓN, CANALES Y M3### 35,573 35,573 35,573 35,573 35,573 35,573 35,573 35,573

2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN,


CANALES Y PRÉSTAMOS M3### 8,749 8,749 8,749 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3### 14,967 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3### 13,068 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3### 7,499 7,499 7,499 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO
SUELO EXISTENTE
DE LA SUBRASANTE INVOLUCRANDO EL M2### 481 481 481 481 481 481 481 481

2.8 230.2 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO


ÚNICAMENTE MATERIAL ADICIONADO
M3### 12,832 12,832 12,832 12,832 12,832 12,832 12,832 12,832

2.9 600.1 EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 20,948 20,948 20,948 20,948 20,948 20,948 20,948 20,948

2.10 600.2 EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO


DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 65,284 65,284 65,284 65,284 65,284 65,284 65,284 65,284

2.11 600.3 EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE


RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 80,058 80,058 80,058 80,058 80,058 80,058 80,058 80,058
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE i
2.12 600.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### p 19,035 19,035 19,035 19,035 19,035 19,035 19,035 19,035
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO o
2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3### 39,738 39,738 39,738 39,738 39,738 39,738 39,738 39,738
DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA
2.14 600.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR M3### 31,203 31,203 31,203 31,203 31,203 31,203 31,203 31,203
DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A
2.15 600.5 P MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA M3### 53,644 53,644 53,644 53,644 53,644 53,644 53,644 53,644
MENOR DE 5 KM)

NORMA ESTRUCTURA DE PAVIMENTO


3 INV
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2### 5,366 5,366 5,366 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3### 147,202 154,055 135,208 131,781 126,641 109,507 128,354 118,074
3.3 330.1 BASE GRANULAR M3### 181,431 189,998 171,150 166,010 160,870 143,736 162,583 152,303
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE
3.4 365.1 (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 M3### 139,125 139,125 139,125 139,125 139,125 139,125 139,125 139,125
Km)
3.5 420.1 RIEGO DE IMPRIMACIÓN M2### 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2### 1,131 1,131 1,131 1,131 1,131 1,131 1,131 1,131
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON
EMULSION ASFÁLTICA M3### 230,190 230,575 230,768 230,190 228,842 227,879 232,694 226,916
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2### 69,622 69,755 69,822 69,622 69,155 68,822 70,488 68,489
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE
CEMENTO ASFÁLTICO) M3### 551,462 594,297 531,692 562,994 564,642 592,649 523,454 571,232

3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE


CEMENTO ASFÁLTICO)
M3### 557,262 600,097 537,492 568,794 570,442 598,449 529,254 577,032

3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE


CEMENTO ASFÁLTICO) M3### 594,307 637,142 574,537 605,840 607,487 635,495 566,300 614,077

3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE


CEMENTO ASFÁLTICO) M3### 587,712 630,547 567,942 599,244 600,892 628,899 559,704 607,482
3,12(1) P MEZCLA ASFALTICA NATURAL M3### 306,638 313,921 303,751 305,686 311,153 291,518 317,304 284,266
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3### 332,068 340,635 321,787 316,647 311,507 294,373 313,220 302,940
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3### 296,620 303,473 284,626 281,199 276,059 258,925 277,772 267,492
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3### 39,001 39,001 39,001 39,001 39,001 39,001 39,001 39,001
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3### 173,492 173,492 173,492 173,492 173,492 173,492 173,492 173,492
3.15 311.1 AFIRMADO M3### 94,156 99,296 78,735 77,022 71,882 68,455 82,162 61,601
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2### 11,958 11,984 11,997 11,958 11,865 11,799 12,129 11,733
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2### i 4,831 4,844 4,850 4,831 4,784 4,751 4,916 4,718
p
3.18 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE
SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3### i 671,070 673,115 674,137 671,070 663,914 658,803 684,360 653,692
o
3.19 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE
SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3### 704,963 707,099 708,167 704,963 697,486 692,147 718,848 686,807

3.20 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE


SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3### 727,605 729,802 730,901 727,605 719,911 714,416 741,892 708,921
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO
3.21 *** (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y ML ### 7,099 7,099 7,099 7,099 7,099 7,099 7,099 7,099
SELLANTE)
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3### 118,938 127,637 111,689 108,789 104,440 98,641 113,139 95,741

NORMA OBRAS DE ARTE


4 INV
4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3### 949,618 951,937 953,097 949,618 941,501 935,703 964,693 929,905
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3### 822,593 824,874 826,014 822,593 814,610 808,910 837,418 803,207
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3### 870,184 872,555 873,740 870,184 861,885 855,958 885,596 850,030
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3### 601,196 603,283 604,328 601,196 593,886 588,667 614,768 583,446
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3### 698,597 700,767 701,853 698,597 690,998 685,571 712,706 680,144
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3### 599,521 601,664 602,737 599,521 592,016 586,657 613,457 581,297
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3### 696,856 699,084 700,199 696,856 689,053 683,482 711,344 677,909
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3### 758,552 760,695 761,768 758,552 751,047 745,688 772,488 740,328
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3### 620,107 622,335 623,450 620,107 612,304 606,733 634,594 601,160
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3### 803,606 805,835 806,950 803,606 795,804 790,233 818,094 784,660
4.11 650 P SUMINISTRO,TRANSPORTE,
MONTAJE DE ACERO A-36
FABRICACIÓN, ENSAMBLAJE Y KG ### 11,978 11,978 11,978 11,978 11,978 11,978 11,978 11,978

4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y


MONTAJE DE ACERO A-588 GRADO B KG ### 15,393 15,393 15,393 15,393 15,393 15,393 15,393 15,393
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,808 1,808 1,808 1,808 1,808 1,808 1,808 1,808
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO
4.14 621.1 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ML ### 2,719,980 2,719,980 2,719,980 2,719,980 2,719,980 2,719,980 2,719,980 2,719,980
ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M.
4.15 621.1 P CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN ML ### 4,193,654 4,197,620 4,199,604 4,193,654 4,179,768 4,169,852 4,219,439 4,159,934
CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI


(INCLUYE REFUERZO) M3### 1,753,972 1,756,094 1,757,156 1,753,972 1,746,541 1,741,235 1,767,770 1,735,928

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###


U(DM3) 88,444 88,444 88,444 88,444 88,444 88,444 88,444 88,444
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### p 366,312 366,567 366,694 366,312 365,420 364,784 367,968 364,147
i
4.19 632 P BARANDA METÁLICA ML ### o 427,245 427,245 427,245 427,245 427,245 427,245 427,245 427,245
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,162 17,162 17,162 17,162 17,162 17,162 17,162 17,162
4.21 671.1 CUNETA
LUGAR
DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL M3### 530,726 536,152 524,630 520,182 509,098 501,331 538,055 491,457
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3### 139,467 148,166 132,218 129,318 124,969 114,820 124,969 116,270
4.23 610.1 RELLENO PARA ESTRUCTURAS M3### 102,686 110,594 90,033 85,288 86,870 71,054 63,146 71,054
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3### 413,579 415,834 416,962 413,579 405,684 400,048 428,239 394,409
4.25 630.7 CONCRETO
BASES
CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA M3### 391,920 396,423 391,294 388,229 381,958 376,501 398,520 372,096

4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
ELEVACIONES M3### 400,563 405,066 399,937 396,872 390,601 385,144 407,163 380,739
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3### 406,363 410,845 405,704 402,673 396,477 391,073 412,823 386,723
CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA
4.28 630 P ELEVACIONES M3### 415,006 419,488 414,347 411,316 405,120 399,716 421,466 395,366
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3### 550,172 552,391 553,500 550,172 542,405 536,857 564,596 531,310
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3### 645,781 648,088 649,241 645,781 637,706 631,939 660,776 626,172
4.31 681.1 GAVIÓN M3### 206,512 214,816 199,593 196,825 192,673 187,138 200,977 184,370
4.32 681.1 GAVIÓN MALLA PVC M3### 210,748 219,051 203,828 201,061 196,909 191,373 205,212 188,605

4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO


CLASE E, 2500 PSI
ML ### 44,336 44,472 44,540 44,336 43,859 43,519 45,221 43,178

4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN


CONCRETO CLASE E, 2500 PSI
ML ### 17,357 17,426 17,460 17,357 17,119 16,949 17,800 16,778

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE


4.35 *** REFUERZO (RESISTENCIA ÚLTIMA 25 KN)
M2### 10,250 10,250 10,250 10,250 10,250 10,250 10,250 10,250
SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO
4.36 *** BX-50 M2### 14,622 14,622 14,622 14,622 14,622 14,622 14,622 14,622

SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO


4.37 *** BX-75 M2### 19,685 19,685 19,685 19,685 19,685 19,685 19,685 19,685

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE


4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2### 23,603 23,603 23,603 23,603 23,603 23,603 23,603 23,603
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN)
M2### 30,332 30,332 30,332 30,332 30,332 30,332 30,332 30,332
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 p
4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### i 7,355 7,355 7,355 7,355 7,355 7,355 7,355 7,355
o
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000
4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 8,384 8,384 8,384 8,384 8,384 8,384 8,384 8,384

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 8,715 8,715 8,715 8,715 8,715 8,715 8,715 8,715

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700


4.43 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 6,205 6,205 6,205 6,205 6,205 6,205 6,205 6,205

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100


4.44 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 9,352 9,352 9,352 9,352 9,352 9,352 9,352 9,352

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400


4.45 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 7,624 7,624 7,624 7,624 7,624 7,624 7,624 7,624

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400


4.46 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 9,352 9,352 9,352 9,352 9,352 9,352 9,352 9,352

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000


4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 17,980 17,980 17,980 17,980 17,980 17,980 17,980 17,980

4.48 661.1 SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO


REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### 640,441 640,472 640,488 640,441 640,329 640,250 640,647 640,170

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,


DIÁMETRO 600 MM ML ### 373,316 373,801 374,044 373,316 371,618 370,406 376,469 369,193
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-
4.50 *** ALCANTARILLADO, DIÁMETRO 36" ML ### 896,041 896,041 896,041 896,041 896,041 896,041 896,041 896,041

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3### 162,433 167,375 147,605 145,958 141,015 137,720 150,900 131,130

4.52 640.1 SUMINISTRO


60000 PSI
FIGURADO Y ARMADO DE ACERO DE REFUERZO
KG ### 4,494 4,494 4,494 4,494 4,494 4,494 4,494 4,494

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE


4.53 *** SUMINISTRO E INSTALACIÓN) ML ### 87,254 87,254 87,254 87,254 87,254 87,254 87,254 87,254

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE


4.54 *** SUMINISTRO E INSTALACIÓN) ML ### 132,952 132,952 132,952 132,952 132,952 132,952 132,952 132,952

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3### 561,091 563,398 564,551 561,091 553,016 547,249 576,086 541,482
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: GUALIVÁ
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Albán La_Peña La_Vega Nimaima Nocaima Quebrada_NegraSan_Francisco Sasaima
4.56 682.1 P COLCHONETA RENO M3### i 222,498 230,802 215,579 212,811 208,659 203,124 216,963 200,356
p
4.57 *** TRINCHO EN MADERA M2###
i 69,017 69,017 69,017 69,017 69,017 69,017 69,017 69,017
o
NORMA SEÑALIZACIÓN
5 INV
5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,113 4,113 4,113 4,113 4,113 4,113 4,113 4,113
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2### 44,032 44,032 44,032 44,032 44,032 44,032 44,032 44,032
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 85,106 85,106 85,106 85,106 85,106 85,106 85,106 85,106
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 70,787 70,787 70,787 70,787 70,787 70,787 70,787 70,787
5.5 730.1 DEFENSA METÁLICA ML ### 151,210 151,310 151,360 151,210 150,860 150,610 151,860 150,360
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
UNIDIRECCIONALES UN ### 13,778 13,778 13,778 13,778 13,778 13,778 13,778 13,778

NORMA MANTENIMIENTO VIAL


6 INV
6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2### 843 843 843 843 843 843 843 843
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O
6.2 801.6 IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y UN ### 131,984 131,984 131,984 131,984 131,984 131,984 131,984 131,984
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE
6.3 801.7 RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA ML ### 25,566 25,566 25,566 25,566 25,566 25,566 25,566 25,566
DISTANCIA DE 5 KM
6.4 211.1 REMOCIÓN DE DERRUMBES M3### 8,310 8,310 8,310 8,310 8,310 8,310 8,310 8,310

6.5 801.1 ROCERÍA


DE 5 KM)
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA HA ### 448,890 448,890 448,890 448,890 448,890 448,890 448,890 448,890

6.6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE


RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2### 15,670 15,670 15,670 15,670 15,670 15,670 15,670 15,670
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2### 25,382 25,382 25,382 25,382 25,382 25,382 25,382 25,382
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2### 9,588 9,588 9,588 9,588 9,588 9,588 9,588 9,588

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMEND
FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
CONSTRUCCIÓN

2,089,761 2,066,318 2,072,433 2,038,798


1,213,023 1,201,301 1,204,359 1,187,541
14,310 14,310 14,310 14,310
16,044 16,044 16,044 16,044
18,546 18,546 18,546 18,546
67,008 67,008 67,008 67,008
47,648 47,391 47,458 47,089
22,359 22,102 22,169 21,801
80,242 80,242 80,242 80,242
6,261 6,261 6,261 6,261
8,882 8,882 8,882 8,882
6,813 6,813 6,813 6,813
7,419 7,419 7,419 7,419
8,964 8,964 8,964 8,964
9,084 9,084 9,084 9,084
13,497 13,497 13,497 13,497
18,477 18,477 18,477 18,477
27,441 27,441 27,441 27,441
39,898 39,898 39,898 39,898
49,367 49,367 49,367 49,367
40,806 40,806 40,806 40,806
57,319 57,319 57,319 57,319
67,872 67,872 67,872 67,872
83,193 83,193 83,193 83,193
9,103 9,103 9,103 9,103
14,736 14,736 14,736 14,736
22,422 22,422 22,422 22,422
36,746 36,746 36,746 36,746
233,157 233,157 233,157 233,157
1,539 1,539 1,539 1,539
5,807 5,807 5,807 5,807
20,960 20,960 20,960 20,960
11,490 11,490 11,490 11,490
11,307 11,307 11,307 11,307
10,480 10,480 10,480 10,480
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
9,803 9,803 9,803 9,803
15,459 15,459 15,459 15,459
13,512 13,512 13,512 13,512
11,490 11,490 11,490 11,490
928,310 925,344 926,412 920,041
10,607 10,607 10,607 10,607
3,831 3,831 3,831 3,831
2,745,832 2,745,832 2,745,832 2,745,832
253,517 253,517 253,517 253,517
9,189 9,189 9,189 9,189

116,244 85,403 83,689 52,848


286,508 259,126 266,270 226,983
297,878 297,878 297,878 297,878
207,425 207,425 207,425 207,425
22,604 22,604 22,604 22,604
707,566 682,422 688,981 652,904
712,055 685,903 692,725 655,201
663,151 638,662 645,050 609,914
49,919 49,919 49,919 49,919
153,988 153,988 153,988 153,988

192,819 192,819 192,819 192,819

239,778 239,778 239,778 239,778

302,992 302,992 302,992 302,992


110,157 108,366 108,833 106,262
137,070 134,473 135,150 131,424
649,001 624,513 630,901 595,765
92,185 92,185 92,185 92,185
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
39,554 39,384 39,428 39,184
203,194 203,024 203,068 202,824
482,822 470,130 475,883 440,115
234,942 231,736 232,778 226,697
271,432 266,086 267,804 257,807
361,347 352,563 355,178 340,248
105,436 105,396 105,436 105,167
1,313,618 1,313,220 1,313,618 1,310,931
123,256 121,376 121,867 119,170
77,360 76,368 76,627 75,204
29,308 28,883 28,994 28,384
46,725 46,300 46,411 45,801
61,438 60,843 60,998 60,145
83,859 83,179 83,356 82,380
115,353 114,757 114,913 114,059

994,427 987,626 989,400 979,642

1,415,431 1,401,828 1,405,376 1,385,860

1,865,315 1,838,110 1,845,206 1,806,173

43,093 43,093 43,093 43,093


56,952 56,952 56,952 56,952
871,786 847,298 853,686 818,550
292,152 270,315 279,064 245,571
105,660 103,282 103,902 100,491

124,771 121,918 122,662 118,569

139,921 136,117 137,110 131,652

147,702 143,660 144,714 138,915


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

170,098 165,105 166,407 159,244

189,557 183,851 185,339 177,152

210,565 204,146 205,821 196,610


102,420 102,006 102,114 101,520
1,022,905 998,417 1,004,805 969,669
98,307 97,946 98,040 97,521
85,945 83,496 84,135 80,621
97,233 94,238 95,019 90,721
113,916 110,160 111,140 105,750
769,484 744,996 751,384 716,248

51,605 50,847 51,044 49,957

309,488 298,551 301,404 285,712


4,285 4,285 4,285 4,285
4,494 4,494 4,494 4,494
6,270 6,270 6,270 6,270
917,149 892,661 899,049 863,913
846,265 819,466 826,457 788,005
911,411 886,923 893,311 858,175
891,343 866,854 873,242 838,106
1,102,087 1,077,599 1,083,987 1,048,850
385,740 358,910 365,909 327,415

31,649 30,973 31,150 30,181


52,062 51,387 51,563 50,594
36,030 35,859 35,904 35,660
167,208 166,867 166,956 166,468
46,377 45,619 45,817 44,729
28,467 28,105 28,199 27,680
103,500 102,819 102,997 102,021

98,221 95,695 96,354 92,729

93,102 93,102 93,102 93,102


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
54,475 54,475 54,475 54,475
89,632 89,632 89,632 89,632
52,740 52,740 52,740 52,740
104,138 104,138 104,138 104,138
61,314 61,314 61,314 61,314
115,915 115,915 115,915 115,915
67,202 67,202 67,202 67,202
42,546 42,204 42,293 41,803
25,587 25,416 25,460 25,215
54,915 54,687 54,746 54,419
32,837 32,723 32,753 32,589
61,663 61,435 61,495 61,168
36,884 36,770 36,800 36,637
104,828 103,688 103,986 102,351
61,493 60,923 61,072 60,254
38,711 38,483 38,543 38,216
23,337 23,223 23,252 23,089
77,134 76,678 76,797 76,143
46,228 46,000 46,060 45,733
91,019 90,658 90,752 90,233
54,848 54,667 54,714 54,455
191,279 189,684 190,100 187,811
114,034 113,236 113,444 112,300
93,879 93,170 93,355 92,337

56,278 55,923 56,016 55,507

49,458 48,948 49,081 48,349


29,828 29,573 29,639 29,273
35,111 34,883 34,942 34,615
21,261 21,147 21,177 21,013
53,545 53,090 53,208 52,554
32,554 32,326 32,385 32,058
102,752 102,068 102,247 101,266
62,124 61,782 61,872 61,381
74,890 74,434 74,553 73,899
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

44,945 44,717 44,777 44,450

159,572 157,977 158,393 156,104


96,204 95,407 95,615 94,470
32,875 32,705 32,749 32,505
38,551 38,041 38,174 37,442
64,586 63,906 64,084 63,108
5,265 5,265 5,265 5,265
52,428 51,753 51,929 50,960
10,639 10,639 10,639 10,639
14,081 14,081 14,081 14,081
18,407 18,407 18,407 18,407
25,806 25,806 25,806 25,806
38,533 38,533 38,533 38,533
5,390 5,208 5,256 4,994

16,246 16,246 16,246 16,246


6,326 6,156 6,200 5,956
7,512 7,342 7,386 7,142
8,817 8,647 8,691 8,447
6,963 6,963 6,963 6,963
13,823 13,823 13,823 13,823
25,873 25,377 25,506 24,794
15,531 15,282 15,347 14,991
22,818 22,340 22,465 21,778
13,693 13,454 13,516 13,173
21,982 21,486 21,615 20,903
13,275 13,027 13,091 12,735
22,818 22,340 22,465 21,778
13,693 13,454 13,516 13,173
22,865 22,511 22,603 22,096

13,715 13,538 13,584 13,331

18,868 18,503 18,598 18,075


11,429 11,247 11,295 11,033
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
18,231 17,852 17,951 17,408
11,111 10,922 10,971 10,700
23,597 23,118 23,243 22,556
14,062 13,823 13,885 13,542
22,760 22,264 22,393 21,681
13,644 13,396 13,461 13,104
18,841 18,463 18,561 18,019
11,398 11,209 11,258 10,987
23,650 23,153 23,283 22,570
14,493 14,245 14,310 13,953

29,263 28,579 28,757 27,776


87,623 86,359 86,689 84,876
56,595 56,595 56,595 56,595
22,526 22,526 22,526 22,526
35,383 35,383 35,383 35,383
82,721 82,721 82,721 82,721
64,760 64,760 64,760 64,760
37,636 37,636 37,636 37,636
86,700 86,700 86,700 86,700
103,539 103,539 103,539 103,539
152,197 152,197 152,197 152,197
60,071 60,071 60,071 60,071
83,432 83,432 83,432 83,432
75,837 75,837 75,837 75,837
134,740 134,740 134,740 134,740
78,709 78,709 78,709 78,709
57,804 57,804 57,804 57,804
32,870 32,870 32,870 32,870
62,946 62,096 62,318 61,098
48,190 48,190 48,190 48,190
44,175 44,175 44,175 44,175
37,227 37,227 37,227 37,227
36,453 36,453 36,453 36,453
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
36,729 36,729 36,729 36,729
51,726 51,726 51,726 51,726
45,469 45,469 45,469 45,469
83,253 83,253 83,253 83,253
153,776 153,776 153,776 153,776
69,114 69,114 69,114 69,114
43,236 43,236 43,236 43,236
33,892 33,892 33,892 33,892
59,171 59,171 59,171 59,171
20,322 20,322 20,322 20,322
24,462 24,462 24,462 24,462
26,517 26,517 26,517 26,517
34,161 34,161 34,161 34,161
22,533 22,533 22,533 22,533
53,060 53,060 53,060 53,060
364,486 364,486 364,486 364,486
415,137 415,137 415,137 415,137
276,675 276,675 276,675 276,675
295,688 295,688 295,688 295,688

520,808 494,840 501,614 464,356


456,866 433,091 439,293 405,180
455,845 431,433 437,801 402,775
413,557 388,291 394,882 358,631
389,897 364,218 370,917 334,074
359,394 333,346 340,141 302,768
317,753 294,284 300,407 266,732
530,732 507,943 513,888 481,189
490,908 467,268 473,435 439,517
549,149 527,040 532,808 501,086
780,549 758,440 764,208 732,486
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
125,767 125,767 125,767 125,767
4,574 4,404 4,448 4,204
140,665 140,665 140,665 140,665
172,342 172,342 172,342 172,342
250,821 250,821 250,821 250,821
279,189 279,189 279,189 279,189
307,590 307,590 307,590 307,590
204,317 204,317 204,317 204,317
231,644 231,644 231,644 231,644
340,950 340,950 340,950 340,950
129,170 129,170 129,170 129,170
171,526 171,526 171,526 171,526
190,654 190,654 190,654 190,654
485,780 485,780 485,780 485,780
42,949 42,949 42,949 42,949
26,707 26,707 26,707 26,707
101,530 101,530 101,530 101,530
124,241 124,241 124,241 124,241
96,505 96,505 96,505 96,505
29,883 29,883 29,883 29,883
29,883 29,883 29,883 29,883
28,325 28,325 28,325 28,325
43,306 43,306 43,306 43,306
53,657 53,657 53,657 53,657
64,696 64,696 64,696 64,696
77,806 77,806 77,806 77,806
366,787 366,787 366,787 366,787
256,387 256,387 256,387 256,387
34,336 34,336 34,336 34,336
43,996 43,996 43,996 43,996
53,657 53,657 53,657 53,657
67,456 67,456 67,456 67,456

77,659 77,659 77,659 77,659


216,430 216,430 216,430 216,430
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
82,160 82,160 82,160 82,160
146,833 146,833 146,833 146,833
139,330 139,330 139,330 139,330
91,475 91,475 91,475 91,475
215,695 215,695 215,695 215,695
112,294 112,294 112,294 112,294
6,733 6,733 6,733 6,733
101,203 101,203 101,203 101,203

123,583 123,583 123,583 123,583

41,675 41,675 41,675 41,675

552,028 552,028 552,028 552,028


198,396 198,396 198,396 198,396

222,394 222,394 222,394 222,394

503,182 503,182 503,182 503,182

130,700 130,700 130,700 130,700

402,651 402,651 402,651 402,651


6,152 6,152 6,152 6,152
283,012 283,012 283,012 283,012
124,472 124,472 124,472 124,472
88,041 88,041 88,041 88,041
90,848 90,848 90,848 90,848

10,756 10,756 10,756 10,756


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

11,940 11,940 11,940 11,940

9,481 9,481 9,481 9,481

225,018 225,018 225,018 225,018


271,641 271,641 271,641 271,641
22,526 22,526 22,526 22,526
35,383 35,383 35,383 35,383
33,918 33,918 33,918 33,918
43,510 43,510 43,510 43,510
89,774 89,774 89,774 89,774
226,411 226,411 226,411 226,411
44,316 44,316 44,316 44,316
616,334 616,334 616,334 616,334
1,268,924 1,268,924 1,268,924 1,268,924
35,670 35,670 35,670 35,670
67,737 67,737 67,737 67,737
101,256 101,256 101,256 101,256
85,563 85,563 85,563 85,563
62,280 62,280 62,280 62,280
66,279 66,279 66,279 66,279
83,761 83,761 83,761 83,761
67,597 67,597 67,597 67,597
84,667 84,667 84,667 84,667
90,582 90,582 90,582 90,582
75,184 75,184 75,184 75,184
12,731 12,731 12,731 12,731
17,941 17,941 17,941 17,941
23,422 23,422 23,422 23,422
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
14,457 14,457 14,457 14,457
8,629 8,629 8,629 8,629
52,212 52,212 52,212 52,212
33,386 33,386 33,386 33,386
10,811 10,811 10,811 10,811
25,774 25,774 25,774 25,774
35,771 35,771 35,771 35,771
48,552 48,552 48,552 48,552
90,847 90,847 90,847 90,847
110,247 110,247 110,247 110,247
61,445 61,445 61,445 61,445
78,278 78,278 78,278 78,278
189,220 189,220 189,220 189,220
390,407 390,407 390,407 390,407
288,365 288,365 288,365 288,365
17,960 17,960 17,960 17,960
22,670 22,670 22,670 22,670
176,352 176,352 176,352 176,352

287,239 287,239 287,239 287,239

478,133 478,133 478,133 478,133

41,349 41,349 41,349 41,349

48,765 48,765 48,765 48,765

62,497 62,497 62,497 62,497

70,942 70,942 70,942 70,942

91,431 91,431 91,431 91,431

105,732 105,732 105,732 105,732

156,315 156,315 156,315 156,315

62,935 62,935 62,935 62,935


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
63,193 63,193 63,193 63,193
40,806 40,806 40,806 40,806
50,316 50,316 50,316 50,316
4,267 4,267 4,267 4,267

6,729 6,729 6,729 6,729


1,038,997 1,038,997 1,038,997 1,038,997
793,332 793,332 793,332 793,332
2,671,359 2,671,359 2,671,359 2,671,359
2,226,943 2,226,943 2,226,943 2,226,943
645,587 645,587 645,587 645,587
835,780 835,780 835,780 835,780
322,169 322,169 322,169 322,169

371,867 371,867 371,867 371,867


59,088 59,088 59,088 59,088
69,964 69,964 69,964 69,964
77,663 77,663 77,663 77,663
91,490 91,490 91,490 91,490
55,547 55,547 55,547 55,547
63,323 63,323 63,323 63,323
146,064 146,064 146,064 146,064
57,039 57,039 57,039 57,039
131,106 131,106 131,106 131,106
78,400 78,400 78,400 78,400
46,486 46,486 46,486 46,486
97,934 97,934 97,934 97,934
418,108 418,108 418,108 418,108

557,020 557,020 557,020 557,020


3,607 3,607 3,607 3,607
4,762 4,762 4,762 4,762
7,411 7,411 7,411 7,411
13,255 13,255 13,255 13,255
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

278,573 278,573 278,573 278,573


78,672 78,672 78,672 78,672
106,569 106,569 106,569 106,569
43,377 43,377 43,377 43,377
1,427,092 1,427,092 1,427,092 1,427,092
1,057,537 1,057,537 1,057,537 1,057,537
1,324,457 1,324,457 1,324,457 1,324,457
616,641 616,641 616,641 616,641
112,433 112,433 112,433 112,433
517,408 517,408 517,408 517,408
647,381 647,381 647,381 647,381
1,710,277 1,710,277 1,710,277 1,710,277
1,259,389 1,259,389 1,259,389 1,259,389

42,931 42,081 42,303 41,082


42,717 41,866 42,088 40,868
15,425 15,255 15,299 15,055
33,444 31,743 32,187 29,747
91,902 90,202 90,645 88,205
28,098 27,585 27,719 26,982
64,158 61,631 62,290 58,665
90,226 86,183 87,238 81,437
31,096 31,096 31,096 31,096
23,451 23,451 23,451 23,451
27,503 27,503 27,503 27,503
52,716 50,442 51,035 47,772
62,028 59,249 59,974 55,986
90,538 86,243 87,364 81,201
135,868 118,355 122,923 97,795
136,052 119,498 124,992 92,778

59,556 59,216 59,305 58,817


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

35,451 35,280 35,325 35,081

69,349 68,498 68,720 67,500


72,749 71,898 72,120 70,900
77,147 76,297 76,518 75,298
78,312 77,972 78,061 77,573
38,468 38,142 38,227 37,759
172,761 171,230 171,629 169,433
49,108 48,286 48,501 47,321
44,740 44,740 44,740 44,740
11,092 10,766 10,851 10,384
9,655 9,655 9,655 9,655
12,965 12,965 12,965 12,965
10,785 10,785 10,785 10,785
18,102 18,102 18,102 18,102
35,318 35,318 35,318 35,318
9,395 9,395 9,395 9,395
76,285 76,285 76,285 76,285
124,805 123,614 123,925 122,217
7,668 7,668 7,668 7,668
33,756 33,416 33,505 33,017
47,176 47,176 47,176 47,176
54,851 54,851 54,851 54,851
50,379 50,379 50,379 50,379
51,771 51,431 51,519 51,031
58,019 57,679 57,767 57,279
11,174 11,174 11,174 11,174
52,391 51,880 52,013 51,281
21,184 21,184 21,184 21,184
126,874 126,874 126,874 126,874
10,155 10,155 10,155 10,155
23,110 23,110 23,110 23,110
14,800 14,800 14,800 14,800
14,377 14,377 14,377 14,377
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
8,717 8,717 8,717 8,717
8,873 8,873 8,873 8,873
19,568 19,568 19,568 19,568
17,826 17,826 17,826 17,826
19,265 19,265 19,265 19,265

22,271 22,271 22,271 22,271

68,036 67,696 67,784 67,296


79,808 79,808 79,808 79,808
34,717 34,717 34,717 34,717
13,609 13,609 13,609 13,609
104,915 104,915 104,915 104,915

126,906 126,906 126,906 126,906

74,971 74,971 74,971 74,971


36,668 36,668 36,668 36,668
56,838 56,838 56,838 56,838
69,806 69,806 69,806 69,806
52,078 52,078 52,078 52,078
96,677 96,677 96,677 96,677
50,338 50,338 50,338 50,338
106,918 106,918 106,918 106,918
13,725 13,725 13,725 13,725

5,627 5,627 5,627 5,627


18,479 18,479 18,479 18,479
25,905 25,905 25,905 25,905

43,707 43,707 43,707 43,707


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

49,987 49,987 49,987 49,987

85,005 85,005 85,005 85,005

19,114 19,114 19,114 19,114

90,939 84,086 90,939 44,678

134,706 117,553 122,028 97,418

184,461 167,327 191,315 121,066


106,150 75,309 73,595 42,754
147,202 130,068 154,055 83,806
181,431 164,297 188,284 118,035

310,749 310,749 310,749 310,749

916,918 916,918 916,918 916,918

496,626 496,626 496,626 496,626

143,580 143,580 143,580 143,580

201,307 201,307 201,307 201,307

186,919 186,919 186,919 186,919

412,050 412,050 412,050 412,050

1,054,562 1,054,562 1,054,562 1,054,562

299,192 299,192 299,192 299,192

211,759 211,759 211,759 211,759


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

83,996 83,996 83,996 83,996

256,563 256,563 256,563 256,563

378,166 378,166 378,166 378,166

8,506 8,506 8,506 8,506


3,158 3,158 3,158 3,158
11,306 11,306 11,306 11,306
43,140 43,140 43,140 43,140
5,928 5,928 5,928 5,928
67,593 67,593 67,593 67,593
3,522 3,522 3,522 3,522
2,831 2,831 2,831 2,831
14,195 14,195 14,195 14,195
4,115 4,115 4,115 4,115
14,969 14,969 14,969 14,969
5,882 5,882 5,882 5,882
6,688 6,688 6,688 6,688
7,122 7,122 7,122 7,122
4,456 4,456 4,456 4,456
15,793 15,793 15,793 15,793
9,775 9,775 9,775 9,775
23,102 23,102 23,102 23,102
2,731 2,731 2,731 2,731
12,456 12,456 12,456 12,456
3,359 3,359 3,359 3,359
12,832 12,832 12,832 12,832
7,211 7,211 7,211 7,211
4,526 4,526 4,526 4,526
22,294 22,294 22,294 22,294
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
12,891 12,891 12,891 12,891
7,955 7,955 7,955 7,955

6,247,372 6,247,372 6,247,372 6,247,372


11,038,120 ### ### 11,038,120
2,888,629 2,888,629 2,888,629 2,888,629
9,440,373 9,440,373 9,440,373 9,440,373
8,840,971 8,840,971 8,840,971 8,840,971
2,731 2,731 2,731 2,731
886,184 886,184 886,184 886,184
88,598 88,598 88,598 88,598
1,604,826 1,604,566 1,604,634 1,604,262
706,484 700,381 701,973 693,216

29,985 29,985 29,985 29,985


44,652 44,652 44,652 44,652
55,393 55,393 55,393 55,393
17,978 17,978 17,978 17,978

21,805 21,805 21,805 21,805

29,762 29,762 29,762 29,762


26,501 26,501 26,501 26,501
27,946 27,946 27,946 27,946
34,978 34,978 34,978 34,978
18,098 18,098 18,098 18,098
23,738 23,738 23,738 23,738
36,545 36,545 36,545 36,545
280,488 280,488 280,488 280,488
322,860 322,860 322,860 322,860
336,662 336,662 336,662 336,662
312,081 312,081 312,081 312,081
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

227,851 227,851 227,851 227,851


34,967 34,967 34,967 34,967
106,231 106,231 106,231 106,231
268,666 268,666 268,666 268,666
53,204 53,204 53,204 53,204
588,470 588,470 588,470 588,470
1,461,570 1,461,570 1,461,570 1,461,570
45,305 45,305 45,305 45,305
228,049 228,049 228,049 228,049
44,886 44,886 44,886 44,886
3,856 3,856 3,856 3,856
6,494 6,494 6,494 6,494
18,914 18,914 18,914 18,914
24,807 24,807 24,807 24,807
32,232 32,232 32,232 32,232
126,130 126,130 126,130 126,130
32,900 32,900 32,900 32,900
107,709 107,709 107,709 107,709
187,454 187,454 187,454 187,454
295,394 295,394 295,394 295,394
366,576 366,576 366,576 366,576
400,734 400,734 400,734 400,734
585,726 585,726 585,726 585,726
344,712 344,712 344,712 344,712
106,897 106,897 106,897 106,897
14,255 14,255 14,255 14,255
29,148 29,148 29,148 29,148
5,116 5,116 5,116 5,116
35,985 35,985 35,985 35,985
37,614 37,614 37,614 37,614
38,428 38,428 38,428 38,428
25,063 25,063 25,063 25,063
27,742 27,742 27,742 27,742
28,867 28,867 28,867 28,867
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
48,645 48,645 48,645 48,645
630,143 630,143 630,143 630,143
323,337 323,337 323,337 323,337
90,311 90,311 90,311 90,311
1,876 1,876 1,876 1,876
8,668 8,668 8,668 8,668
12,950 12,950 12,950 12,950
21,631 21,631 21,631 21,631
4,000 4,000 4,000 4,000
22,641 22,641 22,641 22,641
33,001 33,001 33,001 33,001
19,723 19,723 19,723 19,723

15,727 15,727 15,727 15,727

636,782 636,782 636,782 636,782


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
URBANISMO

9,712 9,712 9,712 9,712


93,196 93,196 93,196 93,196
525,112 525,112 525,112 525,112
1,120,811 1,120,811 1,120,811 1,120,811
128,452 128,452 128,452 128,452
782,724 782,724 782,724 782,724
1,684,642 1,684,642 1,684,642 1,684,642
13,386 13,386 13,386 13,386
16,525 16,525 16,525 16,525
20,764 20,764 20,764 20,764
22,732 22,732 22,732 22,732
27,264 27,264 27,264 27,264
27,264 27,264 27,264 27,264
109,799 109,799 109,799 109,799
127,172 127,172 127,172 127,172
393,595 393,595 393,595 393,595
147,810 147,810 147,810 147,810
243,663 243,663 243,663 243,663
1,078,396 1,078,396 1,078,396 1,078,396
1,242,492 1,242,492 1,242,492 1,242,492
14,540 14,540 14,540 14,540
12,825 12,825 12,825 12,825
31,762 31,762 31,762 31,762
125,905 125,905 125,905 125,905
187,550 187,550 187,550 187,550
30,621 30,621 30,621 30,621
105,530 105,530 105,530 105,530
156,439 156,439 156,439 156,439
30,962 30,962 30,962 30,962
63,853 63,853 63,853 63,853
257,304 257,304 257,304 257,304
74,512 74,512 74,512 74,512
299,386 299,386 299,386 299,386
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
179,346 179,346 179,346 179,346
510,899 510,899 510,899 510,899
1,369,010 1,369,010 1,369,010 1,369,010
2,022,891 2,022,891 2,022,891 2,022,891

10,909 10,909 10,909 10,909


24,915 24,915 24,915 24,915
19,114 19,114 19,114 19,114
111,433 95,488 99,647 76,771
85,905 79,051 85,905 39,643
111,210 80,368 78,655 47,814
123,565 108,192 120,490 88,720
94,120 75,315 87,852 55,464
161,994 139,885 145,653 113,930

117,376 117,376 117,376 117,376


1,224,198 1,224,198 1,224,198 1,224,198
153,406 153,406 153,406 153,406
1,417,942 1,417,942 1,417,942 1,417,942
988,259 988,259 988,259 988,259
62,961 62,961 62,961 62,961
116,517 116,517 116,517 116,517
275,181 275,181 275,181 275,181
275,175 275,175 275,175 275,175
441,808 441,808 441,808 441,808
116,566 116,566 116,566 116,566
116,566 116,566 116,566 116,566
275,181 275,181 275,181 275,181
275,181 275,181 275,181 275,181
441,808 441,808 441,808 441,808
443,352 443,352 443,352 443,352
720,114 720,114 720,114 720,114
1,155,829 1,155,829 1,155,829 1,155,829
71,412 71,412 71,412 71,412
370,937 370,937 370,937 370,937
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
416,142 416,142 416,142 416,142
1,151,693 1,151,693 1,151,693 1,151,693
68,013 67,785 67,844 67,517
336,235 336,235 336,235 336,235
51,182 51,182 51,182 51,182
72,402 72,402 72,402 72,402
104,501 104,501 104,501 104,501
160,420 160,420 160,420 160,420
257,854 257,854 257,854 257,854
374,010 374,010 374,010 374,010
473,340 473,340 473,340 473,340
622,382 622,382 622,382 622,382
856,203 856,203 856,203 856,203

711,435 696,788 700,609 679,593

690,378 679,545 682,371 666,827

746,443 736,679 739,226 725,215

847,222 828,913 833,689 807,420

981,018 965,763 969,743 947,855

866,501 853,074 856,577 837,313


1,021,662 1,014,239 1,016,173 1,005,518
1,505,607 1,484,412 1,489,937 1,459,520
2,086,038 2,047,037 2,057,211 2,001,252
2,796,069 2,731,239 2,748,151 2,655,131
1,871,384 1,871,384 1,871,384 1,871,384
3,961,240 3,961,240 3,961,240 3,961,240
141,597 141,155 141,270 140,636
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
78,021 76,830 77,141 75,433
91,853 90,662 90,973 89,265
62,499 59,846 60,539 56,732
66,940 64,376 65,045 61,367
67,047 64,550 65,202 61,620
260,269 259,827 259,942 259,308
19,247 18,929 19,012 18,555

44,639 42,770 43,258 40,575


85,486 85,250 85,311 84,972
577,383 571,664 573,156 564,950
66,192 65,180 65,444 63,992
95,079 94,067 94,331 92,879
35,967 34,942 35,209 33,738

58,837 56,762 57,303 54,326


105,659 103,433 106,280 97,782
62,809 62,196 62,356 61,478

209,244 208,024 208,342 206,591


683,212 681,503 681,949 679,497
219,130 218,873 218,940 218,571
167,726 166,261 166,643 164,541
169,593 168,128 168,511 166,409
198,637 197,096 197,498 195,287
62,224 61,313 61,551 60,243
72,223 71,202 71,469 70,005
318,598 318,370 318,430 318,103
839,814 839,081 839,272 838,221
3,443,765 3,443,277 3,443,405 3,442,704
3,542,665 3,542,177 3,542,305 3,541,604
496,106 495,592 495,726 494,990
660,149 658,095 658,631 655,683
544,569 544,569 544,569 544,569
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
253,510 252,778 252,969 251,918
588,078 587,508 587,657 586,839
6,552,298 6,548,636 6,549,592 6,544,338

4,113 4,113 4,113 4,113


44,032 44,032 44,032 44,032
319,806 319,585 319,642 319,325
504,830 503,803 504,070 502,597
238,899 238,678 238,735 238,418
253,737 253,516 253,573 253,256
264,974 264,753 264,810 264,493
13,778 13,778 13,778 13,778
14,716 14,716 14,716 14,716

119,911 119,911 119,911 119,911


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
ECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777 152,777

53,673 53,673 53,673 53,673

2,613,971 2,613,971 2,613,971 2,613,971

933,801 933,801 933,801 933,801

89,524 89,524 89,524 89,524

1,318 1,318 1,318 1,318

9,548 9,548 9,548 9,548

35,573 35,573 35,573 35,573

8,749 8,749 8,749 8,749


14,967 14,967 14,967 14,967
13,068 13,068 13,068 13,068
7,499 7,499 7,499 7,499
481 481 481 481

12,832 12,832 12,832 12,832

20,948 20,948 20,948 20,948

65,284 65,284 65,284 65,284

80,058 80,058 80,058 80,058


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
19,035 19,035 19,035 19,035

39,738 39,738 39,738 39,738

31,203 31,203 31,203 31,203

53,644 53,644 53,644 53,644

5,366 5,366 5,366 5,366


147,202 130,068 154,055 83,806
181,431 164,297 188,284 118,035

139,125 139,125 139,125 139,125

3,270 3,270 3,270 3,270


1,131 1,131 1,131 1,131
234,620 230,190 231,346 224,990
71,154 69,622 70,021 67,823
551,462 610,772 569,584 648,052

557,262 616,572 575,384 674,827

594,307 653,617 612,430 711,872

587,712 647,022 605,834 682,264


338,476 258,823 327,533 271,666
332,068 314,934 338,921 268,672
296,620 279,486 303,473 233,224
39,001 39,001 39,001 39,001
173,492 173,492 173,492 173,492
106,150 75,309 73,595 42,754
12,261 11,958 12,037 11,601
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
4,982 4,831 4,870 4,652
694,582 671,070 677,204 643,470

729,528 704,963 711,371 676,127

752,882 727,605 734,198 697,931

7,099 7,099 7,099 7,099

133,436 107,340 124,737 79,793

976,288 949,618 956,575 918,310


848,821 822,593 829,435 791,804
897,450 870,184 877,297 838,176
625,208 601,196 607,460 573,006
723,560 698,597 705,109 669,290
624,177 599,521 605,953 570,577
722,488 696,856 703,542 666,765
783,208 758,552 764,984 729,608
645,739 620,107 626,793 590,016
829,239 803,606 810,293 773,516
11,978 11,978 11,978 11,978

15,393 15,393 15,393 15,393


1,808 1,808 1,808 1,808

2,719,980 2,719,980 2,719,980 2,719,980

4,239,273 4,193,654 4,205,554 4,140,100

1,778,384 1,753,972 1,760,340 1,725,314

88,444 88,444 88,444 88,444


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

369,242 366,312 367,076 362,873

427,245 427,245 427,245 427,245


17,162 17,162 17,162 17,162
564,131 519,128 524,862 468,544
149,616 127,869 145,266 100,322
90,033 83,707 90,033 47,330
439,514 413,579 420,345 383,133
412,599 387,702 398,048 359,599

421,242 396,345 406,691 368,242


426,795 402,146 412,427 374,333
435,438 410,789 421,070 382,976
575,691 550,172 556,829 520,215
672,310 645,781 652,702 614,638
220,351 195,441 212,048 169,147
224,587 199,677 216,283 173,383

45,902 44,336 44,745 42,497

18,141 17,357 17,562 16,438

10,250 10,250 10,250 10,250

14,622 14,622 14,622 14,622

19,685 19,685 19,685 19,685

23,603 23,603 23,603 23,603

30,332 30,332 30,332 30,332


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta

7,355 7,355 7,355 7,355

8,384 8,384 8,384 8,384

8,715 8,715 8,715 8,715

6,205 6,205 6,205 6,205

9,352 9,352 9,352 9,352

7,624 7,624 7,624 7,624

9,352 9,352 9,352 9,352

17,980 17,980 17,980 17,980

640,806 640,441 640,536 640,012

378,894 373,316 374,771 366,768

896,041 896,041 896,041 896,041

173,965 144,310 142,663 113,008

4,494 4,494 4,494 4,494

87,254 87,254 87,254 87,254

132,952 132,952 132,952 132,952

587,620 561,091 568,011 529,948


EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Supatá Útica Vergara Villeta
236,337 211,427 228,034 185,133
69,017 69,017 69,017 69,017

4,113 4,113 4,113 4,113


44,032 44,032 44,032 44,032
85,106 85,106 85,106 85,106
70,787 70,787 70,787 70,787
152,360 151,210 151,510 149,860
13,778 13,778 13,778 13,778

843 843 843 843

131,984 131,984 131,984 131,984

25,566 25,566 25,566 25,566

8,310 8,310 8,310 8,310

448,890 448,890 448,890 448,890

1,804 1,804 1,804 1,804


15,670 15,670 15,670 15,670
25,382 25,382 25,382 25,382
9,588 9,588 9,588 9,588

ABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
CONSTRUCCIÓNp
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2
o
UN ### 2,093,398 2,065,343 2,076,717 2,098,706 2,107,047
1.2 CAMPAMENTO 9 M2 UN ### 1,217,209 1,203,182 1,208,869 1,219,863 1,224,034
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,576 14,576 14,576 14,576 14,576
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,344 16,344 16,344 16,344 16,344
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,879 18,879 18,879 18,879 18,879
1.6 CERCA EN TABLA H=2.30 M ML ### 69,115 69,115 69,115 69,115 69,115
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 48,516 48,208 48,333 48,575 48,666
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,368 22,060 22,185 22,426 22,518
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 954,129 949,258 950,507 953,219 953,836
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,910 10,910 10,910 10,910 10,910
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,949 3,949 3,949 3,949 3,949
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,839,532 2,839,532 2,839,532 2,839,532 2,839,532
1.44 RED TELEFÓNICA PROVISIONAL UN ### 261,262 261,262 261,262 261,262 261,262
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 105,381 74,540 74,540 79,680 74,540
2.2 BASE ARENA CEMENTO 1:20 M3 ### 226,430 195,317 207,930 232,316 241,566
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 23,314 23,314 23,314 23,314 23,314
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 667,894 637,756 649,974 673,597 682,557
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 670,021 638,642 651,363 675,957 685,285
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 623,085 593,703 605,614 628,644 637,379
2.9 PILOTE DE MADERA D=20 CM ML ### 50,273 50,273 50,273 50,273 50,273
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.10 MENOR DE 5 KM) ML ### 155,140 155,140 155,140 155,140 155,140
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.11 MENOR DE 5 KM) ML ### 195,386 195,386 195,386 195,386 195,386
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 MENOR DE 5 KM) ML ### 244,055 244,055 244,055 244,055 244,055
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.13 MENOR DE 5 KM) ML ### 309,572 309,572 309,572 309,572 309,572
2.14 PILOTE HINCADO 25X25 ML ### 108,060 105,907 106,780 108,467 109,107
2.15 PILOTE HINCADO 30X30 ML ### 134,029 130,910 132,174 134,620 135,547
2.16 DADOS EN CONCRETO 3500PSI M3 ### 608,936 579,554 591,465 614,495 623,229
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.17 KM) ML ### 92,943 92,943 92,943 92,943 92,943

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 40,165 39,972 40,050 40,201 40,259
3.2 SIFÓN EN PVC 6" UN ### 209,892 209,699 209,777 209,929 209,986
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ###
i 481,823 455,525 460,159 471,598 472,519
p
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### i 234,643 229,763 231,233 234,284 235,153
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### o 267,956 259,971 262,410 267,452 268,912
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 353,129 340,939 345,082 353,421 356,130
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 106,716 106,537 106,537 106,567 106,537
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,361,725 1,359,934 1,359,934 1,360,233 1,359,934
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 121,707 119,572 120,438 122,111 122,746
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 77,177 76,050 76,507 77,390 77,725
3.11 TUBERÍA DRENAJE PVC 110 ML ### 29,069 28,564 28,769 29,164 29,314
3.12 TUBERÍA DRENAJE PVC 160 ML ### 47,120 46,616 46,820 47,216 47,366
3.13 TUBERÍA DRENAJE PVC 200 ML ### 61,947 61,240 61,527 62,080 62,290
3.14 TUBERÍA DRENAJE PVC 250 ML ### 85,003 84,195 84,523 85,155 85,395
3.15 TUBERÍA DRENAJE PVC 315 ML ### 117,917 117,210 117,497 118,051 118,261
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,013,093 1,005,020 1,008,293 1,014,621 1,017,021
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,434,199 1,418,053 1,424,598 1,437,254 1,442,054

3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,869,122 1,836,829 1,849,920 1,875,232 1,884,832

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 44,394 44,394 44,394 44,394 44,394
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 58,788 58,788 58,788 58,788 58,788
4.3 COLUMNAS 3500 PSI M3 ### 835,473 806,091 818,002 841,032 849,767
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 259,687 247,031 243,493 256,843 263,059
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI M2 ### 103,426 100,574 101,730 103,966 104,814
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI
M2 ### 122,134 118,711 120,098 122,782 123,799
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 134,459 129,895 131,745 135,323 136,680
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 141,893 137,043 139,009 142,810 144,252
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 162,784 156,794 159,222 163,918 165,699
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 181,146 174,299 177,075 182,441 184,476
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 201,040 193,338 196,461 202,498 204,787
4.12 ENTREPISO VIGUETA PLACA M2 ### 104,388 103,902 104,099 104,480 104,625
4.13 ESCALERA MACIZA 3500 PSI M3 ### 991,425 962,043 973,954 996,984 1,005,718
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 100,674 100,235 100,413 100,757 100,888
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 82,383 79,445 80,636 82,939 83,812
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 92,763 89,168 90,625 93,443 94,511
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ###
i 108,181 103,674 105,501 109,034 110,373
p
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### i 730,611 701,229 713,140 736,170 744,904
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### o 50,709 49,799 50,168 50,882 51,153
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 291,585 278,463 283,783 294,068 297,969
4.21 ACERO FIGURADO 37000 PSI KG ### 4,428 4,428 4,428 4,428 4,428
4.22 ACERO FIGURADO 60000 PSI KG ### 4,644 4,644 4,644 4,644 4,644
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,423 6,423 6,423 6,423 6,423
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 879,264 849,883 861,793 884,823 893,558
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 803,014 770,861 783,895 809,098 818,656
4.26 VIGA AÉREA 3500 PSI M3 ### 874,005 844,624 856,535 879,564 888,299
4.27 VIGA CINTA 3500 PSI M3 ### 853,954 824,573 836,484 859,513 868,248
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,065,079 1,035,697 1,047,608 1,070,638 1,079,372
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 335,457 303,350 316,366 341,532 351,077

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,532 29,731 30,056 30,683 30,921
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 50,994 50,194 50,518 51,145 51,383
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,200 36,007 36,086 36,237 36,294
5.4 ARCOS EN LADRILLO PRENSADO ML ### 169,177 168,791 168,947 169,250 169,365
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,455 44,544 44,914 45,627 45,898
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,229 27,790 27,968 28,312 28,443
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 104,899 104,126 104,440 105,046 105,275
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 95,073 92,037 93,268 95,647 96,550
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,393 95,393 95,393 95,393 95,393
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,620 55,620 55,620 55,620 55,620
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 91,789 91,789 91,789 91,789 91,789
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 53,818 53,818 53,818 53,818 53,818
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 106,982 106,982 106,982 106,982 106,982
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,736 62,736 62,736 62,736 62,736
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 119,213 119,213 119,213 119,213 119,213
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,852 68,852 68,852 68,852 68,852
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,720 42,331 42,489 42,793 42,909
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,674 25,479 25,558 25,710 25,768
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 55,891 55,632 55,737 55,940 56,017
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,325 33,195 33,248 33,349 33,388
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 62,825 62,566 62,671 62,874 62,951
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,465 37,336 37,388 37,490 37,528
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ###
i 104,865 103,571 104,095 105,110 105,495
p
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### i 61,512 60,864 61,127 61,634 61,827
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### o 39,052 38,794 38,898 39,101 39,178
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,507 23,378 23,430 23,532 23,570
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 77,977 77,459 77,669 78,075 78,229
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,650 46,391 46,496 46,699 46,776
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 92,985 92,545 92,724 93,068 93,199
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 55,831 55,611 55,700 55,872 55,938
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 193,036 191,223 191,958 193,379 193,918
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 114,912 114,005 114,373 115,083 115,353
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 94,816 94,010 94,337 94,969 95,208
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,747 56,344 56,507 56,823 56,943
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 49,465 48,885 49,120 49,575 49,747
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,831 29,541 29,659 29,886 29,972
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 35,336 35,077 35,182 35,385 35,462
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,374 21,244 21,297 21,398 21,437
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 53,865 53,347 53,557 53,963 54,117
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,713 32,454 32,559 32,762 32,839
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 103,977 103,200 103,515 104,124 104,355
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,737 62,348 62,506 62,810 62,926
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 75,811 75,293 75,503 75,909 76,063
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,429 45,170 45,275 45,478 45,555
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 160,165 158,352 159,087 160,508 161,047
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 96,533 95,627 95,995 96,705 96,974
5.47 REMATES LADRILLO PRENSADO ML ### 33,182 32,989 33,067 33,219 33,276
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,214 37,634 37,869 38,324 38,496
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,433 63,660 63,973 64,579 64,809
5.50 LAVADA DE FACHADA M2 ### 5,288 5,288 5,288 5,288 5,288
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,365 50,564 50,889 51,516 51,754
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,684 10,684 10,684 10,684 10,684
5.53 ANCLAJE 3/8" L=30CM UN ### 14,223 14,223 14,223 14,223 14,223
5.54 ANCLAJE 1/2" L=50CM UN ### 18,617 18,617 18,617 18,617 18,617
5.55 ANCLAJE 5/8" L=70CM UN ### 26,235 26,235 26,235 26,235 26,235
5.56 ANCLAJE 3/4" L=70CM UN ### 39,354 39,354 39,354 39,354 39,354
5.57 ANCLAJE 1" L= 70CM UN ### 5,080 4,862 4,951 5,122 5,187

6 PAÑETES, REVOQUES Y REPELLOS


GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
6.1 ENTRAMADO MADERA CIELO RASO M2 ###
i 16,377 16,377 16,377 16,377 16,377
p
6.2 FILOS O DILATACIONES B/PLACA ML ### i 5,973 5,780 5,858 6,010 6,067
6.3 FILOS O DILATACIONES S/MURO ML ### o 7,159 6,966 7,044 7,195 7,253
6.4 GOTERA EN MORTERO 1:4 ML ### 8,501 8,308 8,386 8,537 8,595
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,141 7,141 7,141 7,141 7,141
6.6 MALLA BAJO ENTRAMADO M2 ### 13,997 13,997 13,997 13,997 13,997
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,918 24,354 24,583 25,025 25,193
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,053 14,771 14,886 15,107 15,190
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,941 21,398 21,618 22,044 22,206
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,255 12,983 13,093 13,306 13,387
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,027 20,463 20,692 21,134 21,302
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,798 12,516 12,630 12,851 12,935
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,941 21,398 21,618 22,044 22,206
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,255 12,983 13,093 13,306 13,387
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,379 21,977 22,140 22,455 22,574
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,472 13,271 13,353 13,510 13,570
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,200 17,785 17,953 18,278 18,401
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,095 10,888 10,972 11,134 11,196
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,503 17,073 17,248 17,584 17,712
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,747 10,532 10,619 10,788 10,852
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,720 22,176 22,396 22,822 22,984
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,624 13,352 13,462 13,675 13,756
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,806 21,242 21,470 21,912 22,080
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,167 12,885 12,999 13,220 13,304
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,114 17,684 17,858 18,195 18,323
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,034 10,819 10,907 11,075 11,139
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,695 22,131 22,360 22,802 22,969
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,016 13,734 13,848 14,069 14,153

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 28,010 27,233 27,548 28,157 28,388
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE) M2 ### 87,265 85,748 86,363 87,553 88,004
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 58,382 58,382 58,382 58,382 58,382
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,078 23,078 23,078 23,078 23,078
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,309 36,309 36,309 36,309 36,309
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 85,469 85,469 85,469 85,469 85,469
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 66,813 66,813 66,813 66,813 66,813
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ###
i 38,640 38,640 38,640 38,640 38,640
p
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### i 89,600 89,600 89,600 89,600 89,600
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### o 107,092 107,092 107,092 107,092 107,092
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 157,631 157,631 157,631 157,631 157,631
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 61,877 61,877 61,877 61,877 61,877
7.13 CANAL PVC AMAZONAS ML ### 85,758 85,758 85,758 85,758 85,758
7.14 CANAL PVC RAINGO ML ### 77,867 77,867 77,867 77,867 77,867
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 139,148 139,148 139,148 139,148 139,148
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 81,392 81,392 81,392 81,392 81,392
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 59,679 59,679 59,679 59,679 59,679
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,564 33,564 33,564 33,564 33,564
7.19 TEJA DE BARRO M2 ### 62,167 61,201 61,593 62,350 62,637
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 49,764 49,764 49,764 49,764 49,764
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 45,594 45,594 45,594 45,594 45,594
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,150 38,150 38,150 38,150 38,150
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 37,381 37,381 37,381 37,381 37,381
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,667 37,667 37,667 37,667 37,667
7.25 TEJA TERMOACÚSTICA M2 ### 53,274 53,274 53,274 53,274 53,274
7.26 TEJA PLÁSTICA No.6 M2 ### 46,776 46,776 46,776 46,776 46,776
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 85,957 85,957 85,957 85,957 85,957
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 159,162 159,162 159,162 159,162 159,162
7.29 TEJA SIN TRASLAPO M2 ### 71,385 71,385 71,385 71,385 71,385
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,005 44,005 44,005 44,005 44,005
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,600 34,600 34,600 34,600 34,600
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO
7.32 4"x2", 15 MM)
M2 ### 60,859 60,859 60,859 60,859 60,859
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,651 20,651 20,651 20,651 20,651
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,952 24,952 24,952 24,952 24,952
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,117 27,117 27,117 27,117 27,117
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,057 35,057 35,057 35,057 35,057
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,011 23,011 23,011 23,011 23,011
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,245 54,245 54,245 54,245 54,245
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 378,104 378,104 378,104 378,104 378,104
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 422,267 422,267 422,267 422,267 422,267
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 285,348 285,348 285,348 285,348 285,348
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 305,454 305,454 305,454 305,454 305,454

8 MORTEROS Y CONCRETOS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
8.1 CONCRETO 4000 PSI M3 ###
i 478,778 447,579 460,226 484,681 493,956
p
8.2 CONCRETO 3500 PSI M3 ### i 417,346 388,820 400,384 422,743 431,223
8.3 CONCRETO 3000 PSI M3 ### o 414,335 385,075 396,937 419,872 428,571
8.4 CONCRETO 2500 PSI M3 ### 369,071 338,716 351,022 374,815 383,839
8.5 CONCRETO 2000 PSI M3 ### 343,361 312,562 325,048 349,189 358,345
8.6 CONCRETO 1500 PSI M3 ### 310,576 279,404 292,041 316,474 325,741
8.7 MORTERO SECO 1:10 M3 ### 268,269 241,600 252,411 273,314 281,242
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 488,967 463,071 473,569 493,866 501,564
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 445,445 418,583 429,472 450,526 458,512
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 509,829 484,706 494,890 514,582 522,050
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 750,169 725,046 735,230 754,922 762,390

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 129,393 129,393 129,393 129,393 129,393
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,257 4,064 4,142 4,294 4,351
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 144,372 144,372 144,372 144,372 144,372
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 177,274 177,274 177,274 177,274 177,274
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 259,493 259,493 259,493 259,493 259,493
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 288,932 288,932 288,932 288,932 288,932
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 318,405 318,405 318,405 318,405 318,405
9.8 HOJA PUERTA FORTEC 0.81 UN ### 211,715 211,715 211,715 211,715 211,715
9.9 HOJA PUERTA FORTEC 0.91 UN ### 240,098 240,098 240,098 240,098 240,098
9.10 HOJA PUERTA FORTEC 1.50 UN ### 353,632 353,632 353,632 353,632 353,632
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 133,661 133,661 133,661 133,661 133,661
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 177,655 177,655 177,655 177,655 177,655
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 197,523 197,523 197,523 197,523 197,523
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 504,063 504,063 504,063 504,063 504,063
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,069 44,069 44,069 44,069 44,069
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,199 27,199 27,199 27,199 27,199
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,146 104,146 104,146 104,146 104,146
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 128,783 128,783 128,783 128,783 128,783
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 99,974 99,974 99,974 99,974 99,974
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,776 30,776 30,776 30,776 30,776
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,776 30,776 30,776 30,776 30,776
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 29,158 29,158 29,158 29,158 29,158
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,507 44,507 44,507 44,507 44,507
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 55,257 55,257 55,257 55,257 55,257
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ###
i 66,724 66,724 66,724 66,724 66,724
p
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### i 80,341 80,341 80,341 80,341 80,341
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### o 380,129 380,129 380,129 380,129 380,129
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 265,460 265,460 265,460 265,460 265,460
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,191 35,191 35,191 35,191 35,191
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,224 45,224 45,224 45,224 45,224
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 55,257 55,257 55,257 55,257 55,257
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 69,591 69,591 69,591 69,591 69,591

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 79,796 79,796 79,796 79,796 79,796
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 223,933 223,933 223,933 223,933 223,933
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 84,182 84,182 84,182 84,182 84,182
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 149,624 149,624 149,624 149,624 149,624
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 142,992 142,992 142,992 142,992 142,992
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 93,857 93,857 93,857 93,857 93,857
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 221,757 221,757 221,757 221,757 221,757
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,193 115,193 115,193 115,193 115,193
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,892 6,892 6,892 6,892 6,892
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL
10.10 GALVANIZADO 2")
M2 ### 102,950 102,950 102,950 102,950 102,950
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 127,237 127,237 127,237 127,237 127,237
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,422 42,422 42,422 42,422 42,422
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 571,802 571,802 571,802 571,802 571,802
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 204,985 204,985 204,985 204,985 204,985
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 228,831 228,831 228,831 228,831 228,831
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS)
M2 ### 520,619 520,619 520,619 520,619 520,619
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 133,277 133,277 133,277 133,277 133,277
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 417,356 417,356 417,356 417,356 417,356
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,304 6,304 6,304 6,304 6,304
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 292,719 292,719 292,719 292,719 292,719
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 127,120 127,120 127,120 127,120 127,120
10.21 REJILLA PISO 0.30 M M2 ### 90,539 90,539 90,539 90,539 90,539
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,278 93,278 93,278 93,278 93,278
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, p
10.23 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ###
i 10,955 10,955 10,955 10,955 10,955
PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
o
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 12,186 12,186 12,186 12,186 12,186
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10.25 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 9,631 9,631 9,631 9,631 9,631
SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 229,552 229,552 229,552 229,552 229,552
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 277,979 277,979 277,979 277,979 277,979
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,078 23,078 23,078 23,078 23,078
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 36,309 36,309 36,309 36,309 36,309
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,708 34,708 34,708 34,708 34,708
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,617 44,617 44,617 44,617 44,617
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 92,318 92,318 92,318 92,318 92,318
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 230,995 230,995 230,995 230,995 230,995
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,361 44,361 44,361 44,361 44,361
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 36,354 36,354 36,354 36,354 36,354
11.13 NIPLE PASAMURO 2" UN ### 68,688 68,688 68,688 68,688 68,688
11.14 NIPLE PASAMURO 4" UN ### 102,789 102,789 102,789 102,789 102,789
11.15 PUNTO AGUA CALIENTE CPVC UN ### 87,205 87,205 87,205 87,205 87,205
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 63,023 63,023 63,023 63,023 63,023
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 67,175 67,175 67,175 67,175 67,175
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 84,914 84,914 84,914 84,914 84,914
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 68,820 68,820 68,820 68,820 68,820
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 86,550 86,550 86,550 86,550 86,550
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 92,695 92,695 92,695 92,695 92,695
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 77,331 77,331 77,331 77,331 77,331
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,057 13,057 13,057 13,057 13,057
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,469 18,469 18,469 18,469 18,469
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 24,095 24,095 24,095 24,095 24,095
11.26 RED SUMINISTRO PVC 1" ML ### 14,831 14,831 14,831 14,831 14,831
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
11.27 RED SUMINISTRO PVC 1/2" ML ###
i 8,825 8,825 8,825 8,825 8,825
p
11.28 RED SUMINISTRO PVC 2 1/2" ML ### i 53,884 53,884 53,884 53,884 53,884
11.29 RED SUMINISTRO PVC 2" ML ### o 34,399 34,399 34,399 34,399 34,399
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,075 11,075 11,075 11,075 11,075
11.31 RED SANITARIA PVC-S 2" ML ### 26,492 26,492 26,492 26,492 26,492
11.32 RED SANITARIA PVC-S 3" ML ### 36,820 36,820 36,820 36,820 36,820
11.33 RED SANITARIA PVC-S 4" ML ### 50,012 50,012 50,012 50,012 50,012
11.34 RED SANITARIA PVC-S 6" ML ### 93,943 93,943 93,943 93,943 93,943
11.35 REGISTRO 1" UN ### 113,676 113,676 113,676 113,676 113,676
11.36 REGISTRO 1/2" UN ### 63,301 63,301 63,301 63,301 63,301
11.37 REGISTRO 3/4" UN ### 80,784 80,784 80,784 80,784 80,784
11.38 REGISTRO 1 1/2" UN ### 195,704 195,704 195,704 195,704 195,704
11.39 REGISTRO 2 1/2" UN ### 404,463 404,463 404,463 404,463 404,463
11.40 REGISTRO 2" UN ### 298,474 298,474 298,474 298,474 298,474
11.41 REVENTILACIÓN 2" ML ### 18,422 18,422 18,422 18,422 18,422
11.42 REVENTILACIÓN 3" ML ### 23,268 23,268 23,268 23,268 23,268
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 181,086 181,086 181,086 181,086 181,086
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 295,566 295,566 295,566 295,566 295,566
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 492,453 492,453 492,453 492,453 492,453
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 42,588 42,588 42,588 42,588 42,588

11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 50,254 50,254 50,254 50,254 50,254

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 64,146 64,146 64,146 64,146 64,146

11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 73,069 73,069 73,069 73,069 73,069

11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 94,219 94,219 94,219 94,219 94,219
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 108,454 108,454 108,454 108,454 108,454

11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 160,144 160,144 160,144 160,144 160,144
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,309 64,309 64,309 64,309 64,309
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,577 64,577 64,577 64,577 64,577
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,890 41,890 41,890 41,890 41,890
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 51,767 51,767 51,767 51,767 51,767
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,404 4,404 4,404 4,404 4,404
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,960 6,960 6,960 6,960 6,960
11.59 GABINETE TIPO III UN ### 1,072,712 1,072,712 1,072,712 1,072,712 1,072,712
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
11.60 GABINETE TIPO I UN ###
i 817,546 817,546 817,546 817,546 817,546
p
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### i 2,769,353 2,769,353 2,769,353 2,769,353 2,769,353
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### o 2,307,749 2,307,749 2,307,749 2,307,749 2,307,749
11.63 VÁLVULA MARIPOSA 3" UN ### 665,202 665,202 665,202 665,202 665,202
11.64 VÁLVULA MARIPOSA 4" UN ### 862,750 862,750 862,750 862,750 862,750
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 334,183 334,183 334,183 334,183 334,183

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 383,695 383,695 383,695 383,695 383,695
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 60,977 60,977 60,977 60,977 60,977
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 72,276 72,276 72,276 72,276 72,276
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 80,136 80,136 80,136 80,136 80,136
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 94,501 94,501 94,501 94,501 94,501
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 57,273 57,273 57,273 57,273 57,273
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 65,326 65,326 65,326 65,326 65,326
12.8 STRIP TELEFÓNICO 10 PARES UN ### 150,220 150,220 150,220 150,220 150,220
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 58,848 58,848 58,848 58,848 58,848
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 135,369 135,369 135,369 135,369 135,369
12.11 SALIDA T.V PVC COMPLETA. UN ### 80,850 80,850 80,850 80,850 80,850
12.12 SALIDA BIFÁSICA C.N. UN ### 47,958 47,958 47,958 47,958 47,958
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 100,817 100,817 100,817 100,817 100,817
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 430,198 430,198 430,198 430,198 430,198
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 573,588 573,588 573,588 573,588 573,588
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,715 3,715 3,715 3,715 3,715
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,903 4,903 4,903 4,903 4,903
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,640 7,640 7,640 7,640 7,640
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,656 13,656 13,656 13,656 13,656
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 287,227 287,227 287,227 287,227 287,227
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 80,957 80,957 80,957 80,957 80,957
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 109,934 109,934 109,934 109,934 109,934
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,297 44,297 44,297 44,297 44,297
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,467,548 1,467,548 1,467,548 1,467,548 1,467,548
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,087,260 1,087,260 1,087,260 1,087,260 1,087,260
12.26 POSTE METÁLICO 6M UN ### 1,369,689 1,369,689 1,369,689 1,369,689 1,369,689
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 639,098 639,098 639,098 639,098 639,098
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 115,946 115,946 115,946 115,946 115,946
12.29 LUMINARIA 70W SODIO UN ### 536,426 536,426 536,426 536,426 536,426
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
12.30 LUMINARIA 150W SODIO UN ###
i 671,426 671,426 671,426 671,426 671,426
p
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### i 1,775,377 1,775,377 1,775,377 1,775,377 1,775,377
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### o 1,307,053 1,307,053 1,307,053 1,307,053 1,307,053

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,773 40,807 41,198 41,956 42,243
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,771 40,805 41,197 41,954 42,241
13.3 ALISTADO PARA LISTÓN M2 ### 15,223 15,030 15,108 15,259 15,317
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 30,003 28,070 28,854 30,368 30,943
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 90,534 88,601 89,385 90,899 91,474
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,230 26,614 26,864 27,347 27,530
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 59,797 56,761 57,992 60,371 61,273
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 83,243 78,387 80,356 84,163 85,606
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,970 31,970 31,970 31,970 31,970
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,906 23,906 23,906 23,906 23,906
13.11 PERMA PLY 2 CAPAS M2 ### 27,970 27,970 27,970 27,970 27,970
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 48,756 46,024 47,131 49,273 50,085
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 57,179 53,840 55,193 57,811 58,803
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 83,064 77,903 79,995 84,040 85,574
13.15 TRITURADO FINO 1/2 M3 ### 98,621 77,833 86,260 102,555 108,735
13.16 TRITURADO GRUESO 3/4 M3 ### 108,544 83,619 90,819 105,935 110,021

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 60,215 59,829 59,986 60,288 60,403
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,781 35,588 35,666 35,818 35,875
14.3 ADOQUÍN CONCRETO 6CM M2 ### 68,936 67,970 68,362 69,119 69,406
14.4 ADOQUÍN CONCRETO 8CM M2 ### 72,486 71,520 71,912 72,669 72,956
14.5 ADOQUÍN GRES PEATONAL M2 ### 76,999 76,033 76,425 77,182 77,469
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE
14.6 ALISTADO
M2 ### 79,742 79,355 79,512 79,815 79,930
14.7 GRAVILLA PARA GRADAS ML ### 37,895 37,500 37,660 37,970 38,087
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 174,137 172,398 173,103 174,466 174,983
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 47,633 46,649 47,048 47,819 48,111
14.10 GUARDAESCOBA EN GRANITO ML ### 45,384 45,384 45,384 45,384 45,384
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,447 10,052 10,212 10,522 10,640
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,978 9,978 9,978 9,978 9,978
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,416 13,416 13,416 13,416 13,416
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,021 11,021 11,021 11,021 11,021
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
14.15 GUARDAESCOBA CEDRO BLANCO ML ###
i 18,620 18,620 18,620 18,620 18,620
p
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### i 36,501 36,501 36,501 36,501 36,501
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### o 9,469 9,469 9,469 9,469 9,469
14.18 LISTÓN M.H. AMARILLO M2 ### 78,152 78,152 78,152 78,152 78,152
14.19 PASO ESCALERA GRANITO ML ### 124,557 123,204 123,753 124,813 125,215
14.20 PIRLANES ALUMINIO ML ### 7,694 7,694 7,694 7,694 7,694
14.21 PIRLANES LADRILLO ML ### 33,432 33,046 33,203 33,505 33,620
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,602 48,602 48,602 48,602 48,602
14.23 PISO VINILO TRÁFICO PESADO M2 ### 56,594 56,594 56,594 56,594 56,594
14.24 PULIDA LACADA PISO MADERA M2 ### 51,455 51,455 51,455 51,455 51,455
14.25 TABLETA DE GRES 25X25 M2 ### 52,174 51,788 51,944 52,247 52,362
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,664 58,278 58,434 58,737 58,852
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,317 11,317 11,317 11,317 11,317
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 52,382 51,802 52,037 52,492 52,664
14.29 JABONERA PORCELANA ACUARIO UN ### 21,797 21,797 21,797 21,797 21,797
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA
14.30 SIMPLE) UN ### 130,877 130,877 130,877 130,877 130,877
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,276 10,276 10,276 10,276 10,276
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,732 23,732 23,732 23,732 23,732
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,102 15,102 15,102 15,102 15,102
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,662 14,662 14,662 14,662 14,662
14.35 REMATES BOCEL ALUMINIO ML ### 8,796 8,796 8,796 8,796 8,796
14.36 REMATES BOCEL PORCELANA ML ### 8,957 8,957 8,957 8,957 8,957
14.37 TAPA REGISTRO 20X20 UN ### 20,053 20,053 20,053 20,053 20,053
14.38 TAPA REGISTRO 6X6 UN ### 18,244 18,244 18,244 18,244 18,244
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,010 20,010 20,010 20,010 20,010
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 23,132 23,132 23,132 23,132 23,132
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 69,189 68,802 68,959 69,262 69,377
14.42 MEDIA CAÑA EN GRANITO ML ### 82,604 82,604 82,604 82,604 82,604
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,855 34,855 34,855 34,855 34,855
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,926 13,926 13,926 13,926 13,926
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 108,880 108,880 108,880 108,880 108,880
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 131,449 131,449 131,449 131,449 131,449

15 CIELO RASO
15.1 APLIQUE YESO ML ### 77,560 77,560 77,560 77,560 77,560
15.2 ARMADURA MADERA Y MALLA M2 ### 37,092 37,092 37,092 37,092 37,092
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ###
i 58,158 58,158 58,158 58,158 58,158
p
15.4 CIELO RASO DURACUSTIC M2 ### i 71,627 71,627 71,627 71,627 71,627
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### o 53,359 53,359 53,359 53,359 53,359
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,425 99,425 99,425 99,425 99,425
15.7 CORNISAS YESO ML ### 52,130 52,130 52,130 52,130 52,130
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 110,149 110,149 110,149 110,149 110,149
15.9 MALLA CON VENA M2 ### 13,895 13,895 13,895 13,895 13,895

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
16.2 UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 105,381 74,540 74,540 79,680 74,540
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 105,043 82,841 91,842 109,244 115,844
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 173,419 142,578 146,005 180,273 185,413
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 95,287 64,446 64,446 69,586 64,446
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 137,350 106,509 109,936 144,204 149,344
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 170,388 139,547 142,974 177,242 182,382

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 321,098 321,098 321,098 321,098 321,098
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 950,525 950,525 950,525 950,525 950,525
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 514,164 514,164 514,164 514,164 514,164
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 147,279 147,279 147,279 147,279 147,279
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 207,423 207,423 207,423 207,423 207,423
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 192,479 192,479 192,479 192,479 192,479
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 426,318 426,318 426,318 426,318 426,318
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,093,493 1,093,493 1,093,493 1,093,493 1,093,493
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 309,095 309,095 309,095 309,095 309,095
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 218,095 218,095 218,095 218,095 218,095
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO,n INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ###
i 85,576 85,576 85,576 85,576 85,576
p
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 i
17.12 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 264,817 264,817 264,817 264,817 264,817
o
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120
17.13 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 391,122 391,122 391,122 391,122 391,122

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,655 8,655 8,655 8,655 8,655
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,226 3,226 3,226 3,226 3,226
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,436 11,436 11,436 11,436 11,436
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,054 44,054 44,054 44,054 44,054
18.5 CARBURO SOBRE PAÑETES M2 ### 6,000 6,000 6,000 6,000 6,000
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 69,999 69,999 69,999 69,999 69,999
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,555 3,555 3,555 3,555 3,555
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,887 2,887 2,887 2,887 2,887
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,424 14,424 14,424 14,424 14,424
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,191 4,191 4,191 4,191 4,191
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,216 15,216 15,216 15,216 15,216
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,040 6,040 6,040 6,040 6,040
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,854 6,854 6,854 6,854 6,854
18.14 ESTUCO M2 ### 7,190 7,190 7,190 7,190 7,190
18.15 ESTUCO (LINEAL) ML ### 4,490 4,490 4,490 4,490 4,490
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,029 16,029 16,029 16,029 16,029
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,894 9,894 9,894 9,894 9,894
18.18 LACA PISOS MADERA M2 ### 23,333 23,333 23,333 23,333 23,333
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,768 2,768 2,768 2,768 2,768
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,771 12,771 12,771 12,771 12,771
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,439 3,439 3,439 3,439 3,439
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,052 13,052 13,052 13,052 13,052
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,324 7,324 7,324 7,324 7,324
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,583 4,583 4,583 4,583 4,583
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,825 22,825 22,825 22,825 22,825
18.26 PINTURA EPÓXICA M2 ### 13,057 13,057 13,057 13,057 13,057
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,038 8,038 8,038 8,038 8,038

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,486,425 6,486,425 6,486,425 6,486,425 6,486,425
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO
19.2 PARA MOVILIZAR (PAR)
UN ### p11,460,448 11,460,448 11,460,448 11,460,448 11,460,448
i
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### o 2,998,962 2,998,962 2,998,962 2,998,962 2,998,962
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,801,399 9,801,399 9,801,399 9,801,399 9,801,399
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,180,060 9,180,060 9,180,060 9,180,060 9,180,060
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,768 2,768 2,768 2,768 2,768
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 919,032 919,032 919,032 919,032 919,032
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 92,024 92,024 92,024 92,024 92,024
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,665,309 1,664,997 1,665,124 1,665,368 1,665,461
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 714,612 707,297 710,263 715,996 718,171

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,700 30,700 30,700 30,700 30,700
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 45,889 45,889 45,889 45,889 45,889
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 56,987 56,987 56,987 56,987 56,987
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,365 18,365 18,365 18,365 18,365
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,318 22,318 22,318 22,318 22,318
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,517 30,517 30,517 30,517 30,517
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,916 26,916 26,916 26,916 26,916
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,394 28,394 28,394 28,394 28,394
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,599 35,599 35,599 35,599 35,599
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,666 18,666 18,666 18,666 18,666
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,512 24,512 24,512 24,512 24,512
20.12 VÁLVULA DE BOLA GAS 1" UN ### 37,800 37,800 37,800 37,800 37,800
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 290,730 290,730 290,730 290,730 290,730
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 334,741 334,741 334,741 334,741 334,741
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 348,923 348,923 348,923 348,923 348,923
20.16 ACOMETIDA GAS 1/2" ML ### 323,009 323,009 323,009 323,009 323,009

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 235,874 235,874 235,874 235,874 235,874
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 36,288 36,288 36,288 36,288 36,288
21.3 SIRENA DE 110 V UN ### 109,682 109,682 109,682 109,682 109,682
21.4 CÁMARA CCTV UN ### 275,113 275,113 275,113 275,113 275,113
21.5 PARLANTE-CIELO FALSO UN ### 54,604 54,604 54,604 54,604 54,604
21.6 AMPLIFICADOR 100W UN ### 607,942 607,942 607,942 607,942 607,942
21.7 AMPLIFICADOR 300W UN ### 1,514,940 1,514,940 1,514,940 1,514,940 1,514,940
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,539 45,539 45,539 45,539 45,539
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ###
i 236,375 236,375 236,375 236,375 236,375
p
21.10 TOMA PARA MICRÓFONO UN ### i 45,868 45,868 45,868 45,868 45,868
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### o 3,972 3,972 3,972 3,972 3,972
21.12 SPLITERS UN ### 6,726 6,726 6,726 6,726 6,726
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,153 19,153 19,153 19,153 19,153
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,164 25,164 25,164 25,164 25,164
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 32,748 32,748 32,748 32,748 32,748
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 130,428 130,428 130,428 130,428 130,428
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 34,010 34,010 34,010 34,010 34,010
21.18 BANDEJA PORTACABLES PARA RACK UN ### 111,593 111,593 111,593 111,593 111,593
21.19 RACK 2' X 24" UN ### 191,417 191,417 191,417 191,417 191,417
21.20 RACK 3' X 24" UN ### 303,531 303,531 303,531 303,531 303,531
21.21 RACK 5' X 24" UN ### 375,823 375,823 375,823 375,823 375,823
21.22 RACK 7' X 24" UN ### 411,302 411,302 411,302 411,302 411,302
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 598,519 598,519 598,519 598,519 598,519
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 351,470 351,470 351,470 351,470 351,470
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 110,504 110,504 110,504 110,504 110,504
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,778 14,778 14,778 14,778 14,778
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 30,247 30,247 30,247 30,247 30,247
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,248 5,248 5,248 5,248 5,248
21.29 CANALETA METÁLICA 4X6 CMS ML ### 36,791 36,791 36,791 36,791 36,791
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,482 38,482 38,482 38,482 38,482
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,328 39,328 39,328 39,328 39,328
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,637 25,637 25,637 25,637 25,637
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,418 28,418 28,418 28,418 28,418
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,587 29,587 29,587 29,587 29,587
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 50,130 50,130 50,130 50,130 50,130
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 651,227 651,227 651,227 651,227 651,227
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 333,376 333,376 333,376 333,376 333,376
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 92,161 92,161 92,161 92,161 92,161
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,920 1,920 1,920 1,920 1,920
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,885 8,885 8,885 8,885 8,885
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,327 13,327 13,327 13,327 13,327
21.42 CABLE TELEFÓNICO 40 PARES ML ### 22,304 22,304 22,304 22,304 22,304
21.43 CABLE TELEVISIÓN RG6 ML ### 4,105 4,105 4,105 4,105 4,105
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,858 22,858 22,858 22,858 22,858
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 33,456 33,456 33,456 33,456 33,456
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ###
i 20,092 20,092 20,092 20,092 20,092
p
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### i 16,138 16,138 16,138 16,138 16,138
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### o 660,001 660,001 660,001 660,001 660,001
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
URBANISMO p
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 96,539 96,539 96,539 96,539 96,539
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 544,899 544,899 544,899 544,899 544,899
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,163,115 1,163,115 1,163,115 1,163,115 1,163,115
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 133,158 133,158 133,158 133,158 133,158
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 812,474 812,474 812,474 812,474 812,474
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,749,273 1,749,273 1,749,273 1,749,273 1,749,273
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,695 13,695 13,695 13,695 13,695
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,955 16,955 16,955 16,955 16,955
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,359 21,359 21,359 21,359 21,359
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 23,403 23,403 23,403 23,403 23,403
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 28,110 28,110 28,110 28,110 28,110
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 28,110 28,110 28,110 28,110 28,110
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 113,889 113,889 113,889 113,889 113,889
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 131,882 131,882 131,882 131,882 131,882
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 408,296 408,296 408,296 408,296 408,296
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 153,370 153,370 153,370 153,370 153,370
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 252,825 252,825 252,825 252,825 252,825
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,119,581 1,119,581 1,119,581 1,119,581 1,119,581
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,290,023 1,290,023 1,290,023 1,290,023 1,290,023
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,946 14,946 14,946 14,946 14,946
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,165 13,165 13,165 13,165 13,165
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 32,969 32,969 32,969 32,969 32,969
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 130,253 130,253 130,253 130,253 130,253
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 194,283 194,283 194,283 194,283 194,283
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 31,597 31,597 31,597 31,597 31,597
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 109,090 109,090 109,090 109,090 109,090
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 161,968 161,968 161,968 161,968 161,968
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 32,003 32,003 32,003 32,003 32,003
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 66,062 66,062 66,062 66,062 66,062
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 266,732 266,732 266,732 266,732 266,732
1.32 UNIÓN REPARACION PVC 4" UN ### 77,132 77,132 77,132 77,132 77,132
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 310,443 310,443 310,443 310,443 310,443
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 185,343 185,343 185,343 185,343 185,343
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 529,731 529,731 529,731 529,731 529,731
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
1.36 VÁLVULA COMPUERTA ELÁSTICA 6"
i
UN ### 1,421,663 1,421,663 1,421,663 1,421,663 1,421,663
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 2,100,790 2,100,790 2,100,790 2,100,790 2,100,790
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,060 11,060 11,060 11,060 11,060
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,219 25,219 25,219 25,219 25,219
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 82,580 62,288 70,514 86,418 92,451
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 100,347 69,506 69,506 74,646 69,506
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 100,347 69,506 69,506 74,646 69,506
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 94,379 79,006 81,056 79,006 81,056
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 66,792 80,396 53,210 51,121 53,210
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 110,823 85,701 95,885 115,576 123,045

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 121,759 121,759 121,759 121,759 121,759
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,271,333 1,271,333 1,271,333 1,271,333 1,271,333
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 159,182 159,182 159,182 159,182 159,182
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,472,571 1,472,571 1,472,571 1,472,571 1,472,571
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,026,219 1,026,219 1,026,219 1,026,219 1,026,219
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,470 63,470 63,470 63,470 63,470
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 120,867 120,867 120,867 120,867 120,867
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 285,616 285,616 285,616 285,616 285,616
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 285,609 285,609 285,609 285,609 285,609
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 458,634 458,634 458,634 458,634 458,634
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 120,918 120,918 120,918 120,918 120,918
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 120,918 120,918 120,918 120,918 120,918
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 285,616 285,616 285,616 285,616 285,616
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 285,616 285,616 285,616 285,616 285,616
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 458,634 458,634 458,634 458,634 458,634
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 458,925 458,925 458,925 458,925 458,925
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 746,390 746,390 746,390 746,390 746,390
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,198,357 1,198,357 1,198,357 1,198,357 1,198,357
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 74,010 74,010 74,010 74,010 74,010
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 383,709 383,709 383,709 383,709 383,709
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 431,713 431,713 431,713 431,713 431,713
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,194,195 1,194,195 1,194,195 1,194,195 1,194,195
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 69,856 69,597 69,702 69,905 69,982
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 347,665 347,665 347,665 347,665 347,665
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 53,009 53,009 53,009 53,009 53,009
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 75,048 75,048 75,048 75,048 75,048
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 108,386 108,386 108,386 108,386 108,386
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 166,415 166,415 166,415 166,415 166,415
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 267,618 267,618 267,618 267,618 267,618
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 387,456 387,456 387,456 387,456 387,456
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 490,576 490,576 490,576 490,576 490,576
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 645,125 645,125 645,125 645,125 645,125
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 887,990 887,990 887,990 887,990 887,990

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 696,415 678,859 685,976 699,737 704,957
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO
4.2 E=1.5CM Y CAÑUELA) ML ### 682,146 669,836 674,826 684,475 688,134
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y
4.3 TAPA HF)
UN ### 745,438 733,734 738,478 747,652 751,132
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 828,225 806,280 815,177 832,378 838,902
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO
4.5 E=1.5CM Y CAÑUELA) ML ### 971,978 954,643 961,670 975,257 980,410
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO
4.6 Y TAPA HF)
UN ### 860,994 844,901 851,425 864,039 868,824
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,019,817 1,011,151 1,014,664 1,021,457 1,024,033
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,482,270 1,457,240 1,467,387 1,487,006 1,494,447
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,047,710 2,000,917 2,019,886 2,056,563 2,070,473
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,711,484 2,633,701 2,665,233 2,726,200 2,749,323
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,934,729 1,934,729 1,934,729 1,934,729 1,934,729
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,102,195 4,102,195 4,102,195 4,102,195 4,102,195
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE
4.13 INTERNO Y DEMOLICIÓN) UN ### 143,210 142,707 142,911 143,305 143,454

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 77,189 75,837 76,385 77,445 77,847
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 91,541 90,189 90,737 91,797 92,199
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 57,964 54,777 56,069 58,567 59,515
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 62,717 59,644 60,890 63,298 64,212
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 63,033 60,038 61,252 63,600 64,490
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
5.6 BORDE SEPARADOR VERDE A-170 ML ###
i 268,673 268,170 268,374 268,768 268,917
p
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### i 18,747 18,364 18,519 18,819 18,933
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### o 41,408 39,161 40,072 41,833 42,500
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 87,425 87,156 87,265 87,476 87,556
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 577,887 571,181 573,899 579,156 581,149
5.11 LOSETA PREFABRICADA A-40 M2 ### 65,375 64,226 64,692 65,593 65,935
5.12 LOSETA PREFABRICADA A-60 M2 ### 95,585 94,435 94,902 95,803 96,145
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 34,366 33,137 33,635 34,598 34,964
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 55,451 52,964 53,972 55,921 56,661
5.15 SARDINEL PREFABRICADO A-10 ML ### 106,748 102,898 103,404 107,595 108,272
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 62,976 62,281 62,563 63,108 63,315

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 213,176 211,713 212,306 213,453 213,888
6.2 BANCA EN CONCRETO M-30 UN ### 703,598 701,550 702,380 703,986 704,595
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 225,544 225,236 225,361 225,602 225,694
6.4 BOLARDO M-60 CONCRETO UN ### 169,219 167,463 168,175 169,551 170,073
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 171,087 169,331 170,043 171,419 171,941
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 201,177 199,330 200,079 201,527 202,077
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 61,236 60,200 60,620 61,432 61,740
6.8 BORDILLO PREFABRICADO A-80 ML ### 71,961 70,802 71,272 72,180 72,525
6.9 CANECA M-120 UN ### 329,520 329,261 329,366 329,569 329,646
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 867,990 867,112 867,468 868,156 868,417
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,572,612 3,572,027 3,572,264 3,572,723 3,572,897
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,675,337 3,674,752 3,674,989 3,675,448 3,675,622
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 513,257 512,641 512,891 513,374 513,557
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 679,718 677,254 678,253 680,184 680,917
6.15 BANCA EN MADERA M-50 UN ### 564,365 564,365 564,365 564,365 564,365
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 259,621 258,743 259,099 259,787 260,048
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 608,488 607,840 608,103 608,610 608,803
6.18 POSTE HISTÓRICO M-131 UN ### 6,791,256 6,786,867 6,788,646 6,792,086 6,793,391

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,267 4,267 4,267 4,267 4,267
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,357 45,357 45,357 45,357 45,357
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 330,526 330,275 330,377 330,574 330,649
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 519,517 518,285 518,785 519,750 520,117
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ###
i 245,306 245,054 245,156 245,353 245,428
p
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### i 260,718 260,466 260,568 260,765 260,840
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### o 272,389 272,137 272,239 272,436 272,511
7.8 TACHAS REFLECTIVAS UN ### 14,228 14,228 14,228 14,228 14,228
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,204 15,204 15,204 15,204 15,204
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 124,257 124,257 124,257 124,257 124,257
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
VÍAS (SEGÚN ESPECIFICACIONES p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.1 201 P UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.2 201 P DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.3 200.1 DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.5 201.7 DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES M3-KM### 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,040 36,040 36,040 36,040 36,040
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
2.9 600.1 DISTANCIA MENOR DE 5 KM) M3 ### 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 600.2 DISTANCIA MENOR DE 5 KM) M3 ### 65,871 65,871 65,871 65,871 65,871
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 600.3 DISTANCIA MENOR DE 5 KM) M3 ### 80,645 80,645 80,645 80,645 80,645
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A
2.12 600.4 UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,035 19,035 19,035 19,035 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE
2.13 600.4 P SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 39,738 39,738 39,738 39,738 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE
2.14 600.5 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 31,203 31,203 31,203 31,203 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO
2.15 600.5 P DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 53,644 53,644 53,644 53,644 53,644
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
p
3 NORMA INV ESTRUCTURA DE PAVIMENTO i
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### o 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 137,350 106,509 109,936 144,204 149,344
3.3 330.1 BASE GRANULAR M3 ### 170,388 139,547 142,974 177,242 182,382
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3.4 365.1 ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,379 3,379 3,379 3,379 3,379
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,156 1,156 1,156 1,156 1,156
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 231,444 225,843 228,114 232,503 234,168
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 69,504 67,747 68,460 69,837 70,359
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 592,547 697,987 719,404 625,497 597,489
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 629,734 735,174 756,592 662,684 634,677
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 667,599 773,039 794,456 700,549 672,541
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 659,484 764,924 786,342 692,434 664,427
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 422,903 449,623 432,123 378,795 368,946
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 327,217 296,376 299,802 334,070 339,211
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 292,741 261,900 265,327 299,595 304,735
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 40,199 40,199 40,199 40,199 40,199
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 179,660 179,660 179,660 179,660 179,660
3.15 311.1 AFIRMADO M3 ### 95,287 64,446 64,446 69,586 64,446
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,937 11,550 11,707 12,010 12,125
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,805 4,611 4,690 4,841 4,899
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3.18 500.1 TRANSFERENCIA Y UNIÓN M3 ### 658,777 630,529 641,980 664,121 672,519
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3.19 500.1 TRANSFERENCIA Y UNIÓN
M3 ### 692,613 663,101 675,065 698,197 706,971
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3.20 500.1 TRANSFERENCIA Y UNIÓN M3 ### 715,217 684,844 697,157 720,964 729,994
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA,
3.21 *** SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,215 7,215 7,215 7,215 7,215
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 100,543 109,465 81,695 78,796 81,695

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 933,992 901,951 914,940 940,055 949,580
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 806,594 775,083 787,857 812,556 821,924
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 853,319 820,560 833,839 859,517 869,256
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 585,517 556,705 568,385 590,968 599,532
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ###
i 682,288 652,336 664,478 687,955 696,859
p
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### i 582,476 552,923 564,904 588,068 596,854
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### o 679,126 648,403 660,858 684,940 694,074
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 741,507 711,954 723,935 747,099 755,885
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 602,154 571,431 583,886 607,967 617,101
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 785,654 754,931 767,386 791,467 800,601
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,169 12,169 12,169 12,169 12,169
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588
4.12 650 P GRADO B KG ### 15,707 15,707 15,707 15,707 15,707
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,844 1,844 1,844 1,844 1,844
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE
4.14 621.1 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,788,845 2,788,845 2,788,845 2,788,845 2,788,845
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL
4.15 621.1 P (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS) ML ### 4,192,170 4,137,362 4,159,580 4,202,540 4,218,834
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,743,287 1,714,027 1,725,889 1,748,824 1,757,523
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 91,262 91,262 91,262 91,262 91,262
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 370,110 366,599 368,023 370,775 371,819
4.19 632 P BARANDA METÁLICA ML ### 436,999 436,999 436,999 436,999 436,999
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,674 17,674 17,674 17,674 17,674
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 511,633 461,388 474,064 501,734 507,865
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 115,248 93,501 96,401 93,501 96,401
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 103,406 74,937 74,937 79,682 74,937
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 392,513 361,406 374,017 398,399 407,647
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 372,716 357,481 354,875 368,305 374,853
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 381,359 366,124 363,518 376,948 383,496
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 388,142 373,174 370,459 383,681 390,149
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 396,785 381,817 379,102 392,324 398,792
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 530,760 500,101 512,530 536,561 545,676
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 625,600 593,727 606,649 631,631 641,106
4.31 681.1 GAVIÓN M3 ### 191,068 199,584 173,077 170,309 173,077
4.32 681.1 GAVIÓN MALLA PVC M3 ### 195,467 203,984 177,476 174,709 177,476
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 43,204 41,322 42,085 43,560 44,120
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 16,822 15,881 16,262 17,000 17,279
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA
4.35 *** ÚLTIMA 25 KN) M2 ### 10,554 10,554 10,554 10,554 10,554
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 15,096 15,096 15,096 15,096 15,096
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 20,355 20,355 20,355 20,355 20,355
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4.38 *** ÚLTIMA 100 KN)
M2 ### p 24,423 24,423 24,423 24,423 24,423
i
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4.39 *** M2 ### o 31,414 31,414 31,414 31,414 31,414
ÚLTIMA 165 KN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y
4.40 *** SEPARACIÓN) M2 ### 7,575 7,575 7,575 7,575 7,575

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y


4.41 *** SEPARACIÓN) M2 ### 8,642 8,642 8,642 8,642 8,642

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y


4.42 *** SEPARACIÓN) M2 ### 8,986 8,986 8,986 8,986 8,986
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y
4.43 *** SEPARACIÓN)
M2 ### 6,379 6,379 6,379 6,379 6,379
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y
4.44 *** SEPARACIÓN) M2 ### 9,647 9,647 9,647 9,647 9,647
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y
4.45 *** SEPARACIÓN)
M2 ### 7,852 7,852 7,852 7,852 7,852
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y
4.46 *** SEPARACIÓN) M2 ### 9,647 9,647 9,647 9,647 9,647

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y


4.47 *** SEPARACIÓN) M2 ### 18,610 18,610 18,610 18,610 18,610

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I,


4.48 661.1 INCLUYE EMBOQUILLADA ML ### 661,884 661,440 661,620 661,968 662,100
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 379,432 372,769 375,470 380,692 382,673
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 927,828 927,828 927,828 927,828 927,828
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 163,580 133,925 133,925 138,868 133,925
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,644 4,644 4,644 4,644 4,644
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 90,420 90,420 90,420 90,420 90,420
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 137,815 137,815 137,815 137,815 137,815
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 542,221 510,348 523,269 548,252 557,727
4.56 682.1 P COLCHONETA RENO M3 ### 207,218 215,734 189,227 186,459 189,227
4.57 *** TRINCHO EN MADERA M2 ### 71,460 71,460 71,460 71,460 71,460

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,267 4,267 4,267 4,267 4,267
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,357 45,357 45,357 45,357 45,357
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 88,181 88,181 88,181 88,181 88,181
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 73,309 73,309 73,309 73,309 73,309
5.5 730.1 DEFENSA METÁLICA ML ### 154,849 153,417 153,997 155,120 155,546
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 14,228 14,228 14,228 14,228 14,228
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita
i
p
6 NORMA INV MANTENIMIENTO VIAL i
6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### o 851 851 851 851 851
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE
6.2 801.6 RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM UN ### 131,984 131,984 131,984 131,984 131,984
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y
6.3 801.7 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 25,566 25,566 25,566 25,566 25,566
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,310 8,310 8,310 8,310 8,310
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6.6 801.4 DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 16,143 16,143 16,143 16,143 16,143
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 26,227 26,227 26,227 26,227 26,227
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,790 9,790 9,790 9,790 9,790

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
CONSTRUCCIÓN

2,076,717 2,118,419 2,084,299


1,208,869 1,229,720 1,212,660
14,576 14,576 14,576
16,344 16,344 16,344
18,879 18,879 18,879
69,115 69,115 69,115
48,333 48,791 48,417
22,185 22,643 22,268
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
950,805 955,085 952,036
10,910 10,910 10,910
3,949 3,949 3,949
2,839,532 2,839,532 2,839,532
261,262 261,262 261,262
9,189 9,189 9,189

79,680 74,540 86,534


207,930 254,179 216,339
297,878 297,878 297,878
207,425 207,425 207,425
23,314 23,314 23,314
649,974 694,775 658,119
651,363 698,006 659,844
605,614 649,289 613,556
50,273 50,273 50,273
155,140 155,140 155,140

195,386 195,386 195,386

244,055 244,055 244,055

309,572 309,572 309,572


106,780 109,980 107,361
132,174 136,812 133,018
591,465 635,140 599,407
92,943 92,943 92,943

40,050 40,337 40,102


209,777 210,065 209,830
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
462,637 477,154 469,030
231,442 236,623 232,701
262,738 271,350 264,801
345,410 360,274 348,610
106,567 106,537 106,607
1,360,233 1,359,934 1,360,631
120,438 123,612 121,015
76,507 78,182 76,811
28,769 29,519 28,905
46,820 47,570 46,957
61,527 62,577 61,718
84,523 85,723 84,741
117,497 118,547 117,688
1,008,293 1,020,294 1,010,475
1,424,598 1,448,600 1,428,962

1,849,920 1,897,923 1,858,648

44,394 44,394 44,394


58,788 58,788 58,788
818,002 861,677 825,944
243,911 274,992 250,474
101,730 105,970 102,501

120,098 125,187 121,024


131,745 138,530 132,979
139,009 146,218 140,320
159,222 168,127 160,841
177,075 187,251 178,925
196,461 207,910 198,542
104,099 104,822 104,231
973,954 1,017,629 981,895
100,413 101,066 100,532
80,636 85,004 81,430
90,625 95,968 91,597
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
105,501 112,200 106,719
713,140 756,815 721,081
50,168 51,522 50,414
283,783 303,288 287,329
4,428 4,428 4,428
4,644 4,644 4,644
6,423 6,423 6,423
861,793 905,469 869,735
783,895 831,691 792,586
856,535 900,210 864,476
836,484 880,159 844,425
1,047,608 1,091,283 1,055,549
316,366 364,092 325,044

30,056 31,245 30,272


50,518 51,708 50,734
36,086 36,373 36,138
168,947 169,522 169,052
44,914 46,267 45,160
27,968 28,621 28,087
104,440 105,589 104,649
93,268 97,780 94,088
95,393 95,393 95,393
55,620 55,620 55,620
91,789 91,789 91,789
53,818 53,818 53,818
106,982 106,982 106,982
62,736 62,736 62,736
119,213 119,213 119,213
68,852 68,852 68,852
42,489 43,066 42,594
25,558 25,847 25,611
55,737 56,122 55,807
33,248 33,440 33,283
62,671 63,056 62,741
37,388 37,581 37,423
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
104,095 106,020 104,445
61,127 62,089 61,302
38,898 39,283 38,968
23,430 23,623 23,465
77,669 78,439 77,809
46,496 46,881 46,566
92,724 93,377 92,842
55,700 56,027 55,760
191,958 194,653 192,448
114,373 115,720 114,618
94,337 95,535 94,555
56,507 57,106 56,616
49,120 49,982 49,277
29,659 30,090 29,737
35,182 35,567 35,252
21,297 21,489 21,332
53,557 54,327 53,697
32,559 32,944 32,629
103,515 104,670 103,725
62,506 63,083 62,611
75,503 76,273 75,643
45,275 45,660 45,345
159,087 161,781 159,577
95,995 97,342 96,239
33,067 33,354 33,119
37,869 38,731 38,026
63,973 65,122 64,182
5,288 5,288 5,288
50,889 52,079 51,105
10,684 10,684 10,684
14,223 14,223 14,223
18,617 18,617 18,617
26,235 26,235 26,235
39,354 39,354 39,354
4,951 5,275 5,010
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
16,377 16,377 16,377
5,858 6,145 5,910
7,044 7,331 7,096
8,386 8,673 8,438
7,141 7,141 7,141
13,997 13,997 13,997
24,583 25,422 24,735
14,886 15,305 14,962
21,618 22,426 21,765
13,093 13,497 13,166
20,692 21,530 20,844
12,630 13,049 12,706
21,618 22,426 21,765
13,093 13,497 13,166
22,140 22,737 22,248
13,353 13,651 13,407
17,953 18,569 18,065
10,972 11,280 11,028
17,248 17,886 17,364
10,619 10,939 10,677
22,396 23,205 22,543
13,462 13,866 13,535
21,470 22,309 21,623
12,999 13,418 13,075
17,858 18,497 17,974
10,907 11,226 10,965
22,360 23,198 22,512
13,848 14,267 13,924

27,548 28,703 27,758


86,363 88,619 86,773
58,382 58,382 58,382
23,078 23,078 23,078
36,309 36,309 36,309
85,469 85,469 85,469
66,813 66,813 66,813
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
38,640 38,640 38,640
89,600 89,600 89,600
107,092 107,092 107,092
157,631 157,631 157,631
61,877 61,877 61,877
85,758 85,758 85,758
77,867 77,867 77,867
139,148 139,148 139,148
81,392 81,392 81,392
59,679 59,679 59,679
33,564 33,564 33,564
61,593 63,029 61,854
49,764 49,764 49,764
45,594 45,594 45,594
38,150 38,150 38,150
37,381 37,381 37,381
37,667 37,667 37,667
53,274 53,274 53,274
46,776 46,776 46,776
85,957 85,957 85,957
159,162 159,162 159,162
71,385 71,385 71,385
44,005 44,005 44,005
34,600 34,600 34,600
60,859 60,859 60,859
20,651 20,651 20,651
24,952 24,952 24,952
27,117 27,117 27,117
35,057 35,057 35,057
23,011 23,011 23,011
54,245 54,245 54,245
378,104 378,104 378,104
422,267 422,267 422,267
285,348 285,348 285,348
305,454 305,454 305,454
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
460,226 506,603 468,659
400,384 442,787 408,094
396,937 440,433 404,845
351,022 396,145 359,226
325,048 370,831 333,372
292,041 338,377 300,466
252,411 292,053 259,619
473,569 512,062 480,568
429,472 469,401 436,732
494,890 532,234 501,680
735,230 772,574 742,020

129,393 129,393 129,393


4,142 4,429 4,194
144,372 144,372 144,372
177,274 177,274 177,274
259,493 259,493 259,493
288,932 288,932 288,932
318,405 318,405 318,405
211,715 211,715 211,715
240,098 240,098 240,098
353,632 353,632 353,632
133,661 133,661 133,661
177,655 177,655 177,655
197,523 197,523 197,523
504,063 504,063 504,063
44,069 44,069 44,069
27,199 27,199 27,199
104,146 104,146 104,146
128,783 128,783 128,783
99,974 99,974 99,974
30,776 30,776 30,776
30,776 30,776 30,776
29,158 29,158 29,158
44,507 44,507 44,507
55,257 55,257 55,257
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
66,724 66,724 66,724
80,341 80,341 80,341
380,129 380,129 380,129
265,460 265,460 265,460
35,191 35,191 35,191
45,224 45,224 45,224
55,257 55,257 55,257
69,591 69,591 69,591

79,796 79,796 79,796


223,933 223,933 223,933
84,182 84,182 84,182
149,624 149,624 149,624
142,992 142,992 142,992
93,857 93,857 93,857
221,757 221,757 221,757
115,193 115,193 115,193
6,892 6,892 6,892
102,950 102,950 102,950
127,237 127,237 127,237
42,422 42,422 42,422
571,802 571,802 571,802
204,985 204,985 204,985
228,831 228,831 228,831

520,619 520,619 520,619


133,277 133,277 133,277
417,356 417,356 417,356
6,304 6,304 6,304
292,719 292,719 292,719
127,120 127,120 127,120
90,539 90,539 90,539
93,278 93,278 93,278
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá

10,955 10,955 10,955

12,186 12,186 12,186

9,631 9,631 9,631

229,552 229,552 229,552


277,979 277,979 277,979
23,078 23,078 23,078
36,309 36,309 36,309
34,708 34,708 34,708
44,617 44,617 44,617
92,318 92,318 92,318
230,995 230,995 230,995
44,361 44,361 44,361
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
36,354 36,354 36,354
68,688 68,688 68,688
102,789 102,789 102,789
87,205 87,205 87,205
63,023 63,023 63,023
67,175 67,175 67,175
84,914 84,914 84,914
68,820 68,820 68,820
86,550 86,550 86,550
92,695 92,695 92,695
77,331 77,331 77,331
13,057 13,057 13,057
18,469 18,469 18,469
24,095 24,095 24,095
14,831 14,831 14,831
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
8,825 8,825 8,825
53,884 53,884 53,884
34,399 34,399 34,399
11,075 11,075 11,075
26,492 26,492 26,492
36,820 36,820 36,820
50,012 50,012 50,012
93,943 93,943 93,943
113,676 113,676 113,676
63,301 63,301 63,301
80,784 80,784 80,784
195,704 195,704 195,704
404,463 404,463 404,463
298,474 298,474 298,474
18,422 18,422 18,422
23,268 23,268 23,268
181,086 181,086 181,086
295,566 295,566 295,566
492,453 492,453 492,453
42,588 42,588 42,588

50,254 50,254 50,254

64,146 64,146 64,146

73,069 73,069 73,069

94,219 94,219 94,219


108,454 108,454 108,454

160,144 160,144 160,144


64,309 64,309 64,309
64,577 64,577 64,577
41,890 41,890 41,890
51,767 51,767 51,767
4,404 4,404 4,404
6,960 6,960 6,960
1,072,712 1,072,712 1,072,712
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
817,546 817,546 817,546
2,769,353 2,769,353 2,769,353
2,307,749 2,307,749 2,307,749
665,202 665,202 665,202
862,750 862,750 862,750
334,183 334,183 334,183

383,695 383,695 383,695


60,977 60,977 60,977
72,276 72,276 72,276
80,136 80,136 80,136
94,501 94,501 94,501
57,273 57,273 57,273
65,326 65,326 65,326
150,220 150,220 150,220
58,848 58,848 58,848
135,369 135,369 135,369
80,850 80,850 80,850
47,958 47,958 47,958
100,817 100,817 100,817
430,198 430,198 430,198
573,588 573,588 573,588
3,715 3,715 3,715
4,903 4,903 4,903
7,640 7,640 7,640
13,656 13,656 13,656
287,227 287,227 287,227
80,957 80,957 80,957
109,934 109,934 109,934
44,297 44,297 44,297
1,467,548 1,467,548 1,467,548
1,087,260 1,087,260 1,087,260
1,369,689 1,369,689 1,369,689
639,098 639,098 639,098
115,946 115,946 115,946
536,426 536,426 536,426
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
671,426 671,426 671,426
1,775,377 1,775,377 1,775,377
1,307,053 1,307,053 1,307,053

41,198 42,635 41,460


41,197 42,633 41,458
15,108 15,395 15,160
28,854 31,726 29,376
89,385 92,257 89,907
26,864 27,779 27,030
57,992 62,504 58,812
80,356 87,575 81,668
31,970 31,970 31,970
23,906 23,906 23,906
27,970 27,970 27,970
47,131 51,192 47,870
55,193 60,157 56,096
79,995 87,666 81,390
86,260 117,162 91,879
92,013 117,221 98,406

59,986 60,560 60,090


35,666 35,954 35,719
68,362 69,798 68,623
71,912 73,348 72,173
76,425 77,861 76,686
79,512 80,086 79,616
37,660 38,247 37,767
173,103 175,688 173,573
47,048 48,510 47,314
45,384 45,384 45,384
10,212 10,800 10,319
9,978 9,978 9,978
13,416 13,416 13,416
11,021 11,021 11,021
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
18,620 18,620 18,620
36,501 36,501 36,501
9,469 9,469 9,469
78,152 78,152 78,152
123,753 125,763 124,118
7,694 7,694 7,694
33,203 33,777 33,307
48,602 48,602 48,602
56,594 56,594 56,594
51,455 51,455 51,455
51,944 52,519 52,049
58,434 59,009 58,539
11,317 11,317 11,317
52,037 52,899 52,194
21,797 21,797 21,797
130,877 130,877 130,877
10,276 10,276 10,276
23,732 23,732 23,732
15,102 15,102 15,102
14,662 14,662 14,662
8,796 8,796 8,796
8,957 8,957 8,957
20,053 20,053 20,053
18,244 18,244 18,244
20,010 20,010 20,010
23,132 23,132 23,132
68,959 69,533 69,063
82,604 82,604 82,604
34,855 34,855 34,855
13,926 13,926 13,926
108,880 108,880 108,880
131,449 131,449 131,449

77,560 77,560 77,560


37,092 37,092 37,092
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
58,158 58,158 58,158
71,627 71,627 71,627
53,359 53,359 53,359
99,425 99,425 99,425
52,130 52,130 52,130
110,149 110,149 110,149
13,895 13,895 13,895

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
43,707 43,707 43,707

49,987 49,987 49,987


85,005 85,005 85,005
19,114 19,114 19,114
79,680 74,540 86,534
91,842 124,844 97,842
147,718 181,986 154,572
69,586 64,446 76,440
111,649 145,917 118,503
144,687 178,955 151,541

321,098 321,098 321,098


950,525 950,525 950,525
514,164 514,164 514,164
147,279 147,279 147,279
207,423 207,423 207,423
192,479 192,479 192,479
426,318 426,318 426,318
1,093,493 1,093,493 1,093,493
309,095 309,095 309,095
218,095 218,095 218,095
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
85,576 85,576 85,576
264,817 264,817 264,817

391,122 391,122 391,122

8,655 8,655 8,655


3,226 3,226 3,226
11,436 11,436 11,436
44,054 44,054 44,054
6,000 6,000 6,000
69,999 69,999 69,999
3,555 3,555 3,555
2,887 2,887 2,887
14,424 14,424 14,424
4,191 4,191 4,191
15,216 15,216 15,216
6,040 6,040 6,040
6,854 6,854 6,854
7,190 7,190 7,190
4,490 4,490 4,490
16,029 16,029 16,029
9,894 9,894 9,894
23,333 23,333 23,333
2,768 2,768 2,768
12,771 12,771 12,771
3,439 3,439 3,439
13,052 13,052 13,052
7,324 7,324 7,324
4,583 4,583 4,583
22,825 22,825 22,825
13,057 13,057 13,057
8,038 8,038 8,038

6,486,425 6,486,425 6,486,425


GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá

11,460,448 11,460,448 11,460,448


2,998,962 2,998,962 2,998,962
9,801,399 9,801,399 9,801,399
9,180,060 9,180,060 9,180,060
2,768 2,768 2,768
919,032 919,032 919,032
92,024 92,024 92,024
1,665,124 1,665,588 1,665,208
710,263 721,137 712,240

30,700 30,700 30,700


45,889 45,889 45,889
56,987 56,987 56,987
18,365 18,365 18,365
22,318 22,318 22,318
30,517 30,517 30,517
26,916 26,916 26,916
28,394 28,394 28,394
35,599 35,599 35,599
18,666 18,666 18,666
24,512 24,512 24,512
37,800 37,800 37,800
290,730 290,730 290,730
334,741 334,741 334,741
348,923 348,923 348,923
323,009 323,009 323,009

235,874 235,874 235,874


36,288 36,288 36,288
109,682 109,682 109,682
275,113 275,113 275,113
54,604 54,604 54,604
607,942 607,942 607,942
1,514,940 1,514,940 1,514,940
45,539 45,539 45,539
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
236,375 236,375 236,375
45,868 45,868 45,868
3,972 3,972 3,972
6,726 6,726 6,726
19,153 19,153 19,153
25,164 25,164 25,164
32,748 32,748 32,748
130,428 130,428 130,428
34,010 34,010 34,010
111,593 111,593 111,593
191,417 191,417 191,417
303,531 303,531 303,531
375,823 375,823 375,823
411,302 411,302 411,302
598,519 598,519 598,519
351,470 351,470 351,470
110,504 110,504 110,504
14,778 14,778 14,778
30,247 30,247 30,247
5,248 5,248 5,248
36,791 36,791 36,791
38,482 38,482 38,482
39,328 39,328 39,328
25,637 25,637 25,637
28,418 28,418 28,418
29,587 29,587 29,587
50,130 50,130 50,130
651,227 651,227 651,227
333,376 333,376 333,376
92,161 92,161 92,161
1,920 1,920 1,920
8,885 8,885 8,885
13,327 13,327 13,327
22,304 22,304 22,304
4,105 4,105 4,105
22,858 22,858 22,858
33,456 33,456 33,456
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
20,092 20,092 20,092
16,138 16,138 16,138
660,001 660,001 660,001
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
URBANISMO

9,712 9,712 9,712


96,539 96,539 96,539
544,899 544,899 544,899
1,163,115 1,163,115 1,163,115
133,158 133,158 133,158
812,474 812,474 812,474
1,749,273 1,749,273 1,749,273
13,695 13,695 13,695
16,955 16,955 16,955
21,359 21,359 21,359
23,403 23,403 23,403
28,110 28,110 28,110
28,110 28,110 28,110
113,889 113,889 113,889
131,882 131,882 131,882
408,296 408,296 408,296
153,370 153,370 153,370
252,825 252,825 252,825
1,119,581 1,119,581 1,119,581
1,290,023 1,290,023 1,290,023
14,946 14,946 14,946
13,165 13,165 13,165
32,969 32,969 32,969
130,253 130,253 130,253
194,283 194,283 194,283
31,597 31,597 31,597
109,090 109,090 109,090
161,968 161,968 161,968
32,003 32,003 32,003
66,062 66,062 66,062
266,732 266,732 266,732
77,132 77,132 77,132
310,443 310,443 310,443
185,343 185,343 185,343
529,731 529,731 529,731
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
1,421,663 1,421,663 1,421,663
2,100,790 2,100,790 2,100,790

11,060 11,060 11,060


25,219 25,219 25,219
19,114 19,114 19,114
70,514 100,676 75,998
74,646 69,506 81,499
74,646 69,506 81,499
82,081 92,329 86,180
54,255 64,702 58,434
95,885 133,229 102,675

121,759 121,759 121,759


1,271,333 1,271,333 1,271,333
159,182 159,182 159,182
1,472,571 1,472,571 1,472,571
1,026,219 1,026,219 1,026,219
63,470 63,470 63,470
120,867 120,867 120,867
285,616 285,616 285,616
285,609 285,609 285,609
458,634 458,634 458,634
120,918 120,918 120,918
120,918 120,918 120,918
285,616 285,616 285,616
285,616 285,616 285,616
458,634 458,634 458,634
458,925 458,925 458,925
746,390 746,390 746,390
1,198,357 1,198,357 1,198,357
74,010 74,010 74,010
383,709 383,709 383,709
431,713 431,713 431,713
1,194,195 1,194,195 1,194,195
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
69,702 70,087 69,772
347,665 347,665 347,665
53,009 53,009 53,009
75,048 75,048 75,048
108,386 108,386 108,386
166,415 166,415 166,415
267,618 267,618 267,618
387,456 387,456 387,456
490,576 490,576 490,576
645,125 645,125 645,125
887,990 887,990 887,990

685,976 712,074 690,721


674,826 693,125 678,153

738,478 755,877 741,642


815,177 847,799 821,108
961,670 987,437 966,355

851,425 875,348 855,774


1,014,664 1,027,546 1,017,006
1,467,387 1,504,594 1,474,152
2,019,886 2,089,443 2,032,533
2,665,233 2,780,855 2,686,256
1,934,729 1,934,729 1,934,729
4,102,195 4,102,195 4,102,195
142,911 143,658 143,047

76,385 78,396 76,751


90,737 92,748 91,103
56,069 60,807 56,930
60,890 65,457 61,720
61,252 65,704 62,061
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
268,374 269,121 268,510
18,519 19,088 18,623
40,072 43,411 40,679
87,265 87,665 87,338
573,899 583,867 575,712
64,692 66,401 65,003
94,902 96,611 95,212
33,635 35,462 33,967
53,972 57,669 54,644
103,603 107,983 104,472
62,563 63,597 62,751

212,306 214,481 212,701


702,380 705,425 702,934
225,361 225,818 225,444
168,175 170,785 168,650
170,043 172,652 170,517
200,079 202,826 200,578
60,620 62,160 60,900
71,272 72,995 71,585
329,366 329,751 329,436
867,468 868,773 867,706
3,572,264 3,573,134 3,572,422
3,674,989 3,675,859 3,675,147
512,891 513,807 513,058
678,253 681,916 678,919
564,365 564,365 564,365
259,099 260,404 259,336
608,103 609,065 608,278
6,788,646 6,795,170 6,789,832

4,267 4,267 4,267


45,357 45,357 45,357
330,377 330,750 330,445
518,785 520,616 519,118
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
245,156 245,530 245,224
260,568 260,942 260,636
272,239 272,613 272,307
14,228 14,228 14,228
15,204 15,204 15,204
124,257 124,257 124,257
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
PECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548


36,040 36,040 36,040
8,749 8,749 8,749
14,967 14,967 14,967
13,068 13,068 13,068
7,499 7,499 7,499
481 481 481
12,832 12,832 12,832

20,948 20,948 20,948

65,871 65,871 65,871

80,645 80,645 80,645

19,035 19,035 19,035

39,738 39,738 39,738

31,203 31,203 31,203

53,644 53,644 53,644


GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá

5,366 5,366 5,366


111,649 145,917 118,503
144,687 178,955 151,541
139,125 139,125 139,125
3,379 3,379 3,379
1,156 1,156 1,156
228,114 236,439 229,627
68,460 71,072 68,934
714,462 638,677 735,879
751,649 675,864 773,067
789,514 713,729 810,931
781,399 705,614 802,817
422,598 382,938 442,999
301,516 335,784 308,369
267,040 301,308 273,894
40,199 40,199 40,199
179,660 179,660 179,660
69,586 64,446 76,440
11,707 12,281 11,811
4,690 4,977 4,742
641,980 683,970 649,615

675,065 718,934 683,041

697,157 742,307 705,366

7,215 7,215 7,215


83,145 97,643 88,944

914,940 962,570 923,600


787,857 834,697 796,374
833,839 882,535 842,694
568,385 611,212 576,172
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá
664,478 709,001 672,573
564,904 608,835 572,891
660,858 706,529 669,162
723,935 767,866 731,922
583,886 629,557 592,189
767,386 813,056 775,689
12,169 12,169 12,169

15,707 15,707 15,707


1,844 1,844 1,844
2,788,845 2,788,845 2,788,845

4,159,580 4,241,053 4,174,394


1,725,889 1,769,385 1,733,797
91,262 91,262 91,262
368,023 373,242 368,972
436,999 436,999 436,999
17,674 17,674 17,674
477,227 520,540 489,894
97,851 112,349 103,650
79,682 74,937 86,008
374,017 420,258 382,424
355,402 388,144 362,505
364,045 396,787 371,148
370,986 403,332 378,018
379,629 411,975 386,661
512,530 558,105 520,816
606,649 654,028 615,263
174,461 188,300 179,996
178,860 192,699 184,396
42,085 44,883 42,594
16,262 17,661 16,516
10,554 10,554 10,554
15,096 15,096 15,096
20,355 20,355 20,355
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá

24,423 24,423 24,423

31,414 31,414 31,414

7,575 7,575 7,575

8,642 8,642 8,642

8,986 8,986 8,986

6,379 6,379 6,379

9,647 9,647 9,647

7,852 7,852 7,852

9,647 9,647 9,647

18,610 18,610 18,610

661,620 662,280 661,740


375,470 385,374 377,271
927,828 927,828 927,828
138,868 133,925 145,458
4,644 4,644 4,644
90,420 90,420 90,420
137,815 137,815 137,815
523,269 570,649 531,884
190,611 204,450 196,146
71,460 71,460 71,460

4,267 4,267 4,267


45,357 45,357 45,357
88,181 88,181 88,181
73,309 73,309 73,309
153,997 156,126 154,385
14,228 14,228 14,228
GOBERNACIÓN DE CUNDINAMARCA
PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Junín La_Calera Ubalá

851 851 851


131,984 131,984 131,984

25,566 25,566 25,566


8,310 8,310 8,310
448,890 448,890 448,890
1,804 1,804 1,804
16,143 16,143 16,143
26,227 26,227 26,227
9,790 9,790 9,790

U DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2
o
UN ### 2,103,026 2,082,218 2,083,759 2,089,924 2,087,612
1.2 CAMPAMENTO 9 M2 UN ### 1,222,103 1,211,699 1,212,469 1,215,552 1,214,396
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,583 14,583 14,583 14,583 14,583
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,353 16,353 16,353 16,353 16,353
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,889 18,889 18,889 18,889 18,889
1.6 CERCA EN TABLA H=2.30 M ML ### 69,185 69,185 69,185 69,185 69,185
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 48,618 48,394 48,411 48,477 48,452
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,444 22,221 22,237 22,304 22,279
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 9,803 9,803 9,803 9,803 9,803
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
1.37 DESMONTE MUROS SECOS M2 ###
i 15,459 15,459 15,459 15,459 15,459
p
1.38 DESMONTE MARCOS Y PUERTAS UN ### i 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### o 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 955,630 951,902 952,664 952,133 953,974
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 10,921 10,921 10,921 10,921 10,921
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,955 3,955 3,955 3,955 3,955
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,842,418 2,842,418 2,842,418 2,842,418 2,842,418
1.44 RED TELEFÓNICA PROVISIONAL UN ### 261,524 261,524 261,524 261,524 261,524
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 123,162 85,540 95,821 87,181 123,162
2.2 BASE ARENA CEMENTO 1:20 M3 ### 222,776 202,026 203,562 209,711 207,405
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 23,336 23,336 23,336 23,336 23,336
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 675,040 653,016 654,647 661,174 658,725
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 676,310 653,592 655,274 662,007 659,481
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 628,953 607,681 609,255 615,560 613,195
2.9 PILOTE DE MADERA D=20 CM ML ### 50,284 50,284 50,284 50,284 50,284
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM) ML ### 155,175 155,175 155,175 155,175 155,175
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 DISTANCIA MENOR DE 5 KM) ML ### 195,465 195,465 195,465 195,465 195,465
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 DISTANCIA MENOR DE 5 KM)
ML ### 244,188 244,188 244,188 244,188 244,188
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 DISTANCIA MENOR DE 5 KM) ML ### 309,776 309,776 309,776 309,776 309,776
2.14 PILOTE HINCADO 25X25 ML ### 108,407 106,869 106,983 107,439 107,268
2.15 PILOTE HINCADO 30X30 ML ### 134,534 132,304 132,469 133,130 132,882
2.16 DADOS EN CONCRETO 3500PSI M3 ### 614,804 593,531 595,106 601,411 599,046
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 92,966 92,966 92,966 92,966 92,966

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 40,172 40,043 40,053 40,091 40,077
3.2 SIFÓN EN PVC 6" UN ### 210,085 209,956 209,966 210,004 209,990
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ###
i 485,830 464,811 470,406 463,053 479,437
p
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### i 236,342 232,512 233,136 233,125 234,279
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### o 270,489 264,261 265,258 265,303 267,092
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 357,397 347,964 349,198 350,193 351,626
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 106,747 106,598 106,657 106,538 106,747
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,363,108 1,361,615 1,362,212 1,361,018 1,363,108
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 121,536 120,112 120,217 120,639 120,481
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 77,106 76,355 76,410 76,633 76,549
3.11 TUBERÍA DRENAJE PVC 110 ML ### 29,384 28,981 29,011 29,131 29,086
3.12 TUBERÍA DRENAJE PVC 160 ML ### 47,456 47,053 47,083 47,202 47,157
3.13 TUBERÍA DRENAJE PVC 200 ML ### 62,414 61,850 61,892 62,059 61,997
3.14 TUBERÍA DRENAJE PVC 250 ML ### 85,554 84,910 84,957 85,148 85,077
3.15 TUBERÍA DRENAJE PVC 315 ML ### 118,447 117,882 117,924 118,091 118,029
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 1,018,830 1,012,384 1,012,861 1,014,771 1,014,055

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3.17 FILTRANTE) UN ### 1,445,106 1,432,214 1,433,168 1,436,989 1,435,556

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL


3.18 FILTRANTE) UN ### 1,889,909 1,864,124 1,866,032 1,873,674 1,870,808

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 44,438 44,438 44,438 44,438 44,438
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 58,849 58,849 58,849 58,849 58,849
4.3 COLUMNAS 3500 PSI M3 ### 841,459 820,187 821,762 828,066 825,702
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 263,167 249,614 251,036 254,216 261,904
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI M2 ### 104,046 101,980 102,133 102,745 102,516
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 122,878 120,399 120,583 121,317 121,042
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 135,396 132,091 132,336 133,315 132,948
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 142,887 139,376 139,636 140,677 140,287
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 164,009 159,672 159,993 161,278 160,796
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 182,543 177,587 177,953 179,423 178,871
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 202,611 197,035 197,447 199,100 198,480
4.12 ENTREPISO VIGUETA PLACA M2 ### 104,579 104,225 104,251 104,356 104,317
4.13 ESCALERA MACIZA 3500 PSI M3 ### 997,548 976,276 977,850 984,155 981,790
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 100,658 100,378 100,399 100,482 100,451
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ###
i 82,983 80,855 81,013 81,643 81,407
p
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### i 93,493 90,890 91,083 91,854 91,565
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### o 109,093 105,829 106,071 107,038 106,675
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 736,513 715,240 716,815 723,120 720,755
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 50,855 50,204 50,252 50,445 50,373
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 294,205 284,705 285,408 288,224 287,167
4.21 ACERO FIGURADO 37000 PSI KG ### 4,433 4,433 4,433 4,433 4,433
4.22 ACERO FIGURADO 60000 PSI KG ### 4,649 4,649 4,649 4,649 4,649
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,427 6,427 6,427 6,427 6,427
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 885,200 863,927 865,502 871,806 869,442
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 809,479 786,193 787,917 794,818 792,230
4.26 VIGA AÉREA 3500 PSI M3 ### 879,957 858,684 860,259 866,564 864,199
4.27 VIGA CINTA 3500 PSI M3 ### 859,906 838,634 840,209 846,513 844,148
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,071,043 1,049,771 1,051,346 1,057,650 1,055,285
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 344,683 320,869 322,633 329,689 327,043

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,601 30,039 30,080 30,247 30,185
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 51,065 50,502 50,544 50,711 50,648
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,205 36,076 36,086 36,124 36,110
5.4 ARCOS EN LADRILLO PRENSADO ML ### 169,230 168,972 168,991 169,068 169,039
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,599 44,949 44,997 45,190 45,117
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,122 27,842 27,863 27,946 27,915
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 104,917 104,402 104,440 104,593 104,535
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 95,552 93,383 93,544 94,186 93,945
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,463 95,463 95,463 95,463 95,463
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,655 55,655 55,655 55,655 55,655
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 91,854 91,854 91,854 91,854 91,854
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 53,851 53,851 53,851 53,851 53,851
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 107,071 107,071 107,071 107,071 107,071
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,780 62,780 62,780 62,780 62,780
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 119,314 119,314 119,314 119,314 119,314
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,902 68,902 68,902 68,902 68,902
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,704 42,445 42,465 42,541 42,513
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,666 25,536 25,546 25,584 25,570
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 55,916 55,744 55,757 55,808 55,789
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,338 33,251 33,258 33,283 33,274
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ###
i 62,851 62,678 62,691 62,742 62,723
p
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### i 37,478 37,392 37,398 37,424 37,414
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### o 104,798 103,935 103,999 104,255 104,159
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 61,478 61,047 61,078 61,206 61,158
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 39,051 38,878 38,891 38,942 38,923
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,506 23,420 23,426 23,452 23,442
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 77,976 77,631 77,657 77,759 77,721
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,649 46,477 46,489 46,541 46,521
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 92,955 92,675 92,696 92,779 92,748
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 55,816 55,676 55,686 55,728 55,712
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 193,086 191,877 191,966 192,325 192,190
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 114,937 114,332 114,377 114,556 114,489
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 95,098 94,514 94,557 94,730 94,665
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,888 56,595 56,617 56,704 56,671
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 49,403 49,016 49,045 49,159 49,116
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,800 29,607 29,621 29,678 29,657
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 35,339 35,166 35,179 35,230 35,211
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,375 21,289 21,295 21,321 21,311
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 53,866 53,520 53,546 53,648 53,610
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,714 32,541 32,554 32,605 32,586
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 104,014 103,496 103,534 103,687 103,630
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,755 62,496 62,515 62,592 62,563
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 75,815 75,470 75,495 75,598 75,559
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,431 45,259 45,272 45,323 45,304
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 160,092 158,883 158,972 159,331 159,196
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 96,498 95,893 95,938 96,117 96,050
5.47 REMATES LADRILLO PRENSADO ML ### 33,194 33,065 33,074 33,112 33,098
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,344 37,923 37,955 38,079 38,032
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,609 64,049 64,091 64,257 64,194
5.50 LAVADA DE FACHADA M2 ### 5,289 5,289 5,289 5,289 5,289
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,436 50,874 50,915 51,082 51,019
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,686 10,686 10,686 10,686 10,686
5.53 ANCLAJE 3/8" L=30CM UN ### 14,227 14,227 14,227 14,227 14,227
5.54 ANCLAJE 1/2" L=50CM UN ### 18,624 18,624 18,624 18,624 18,624
5.55 ANCLAJE 5/8" L=70CM UN ### 26,249 26,249 26,249 26,249 26,249
5.56 ANCLAJE 3/4" L=70CM UN ### 39,380 39,380 39,380 39,380 39,380
5.57 ANCLAJE 1" L= 70CM UN ### 5,131 4,972 4,984 5,031 5,013
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
p
6 PAÑETES, REVOQUES Y REPELLOS i
6.1 ENTRAMADO MADERA CIELO RASO M2 ### o 16,381 16,381 16,381 16,381 16,381
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,951 5,822 5,832 5,870 5,856
6.3 FILOS O DILATACIONES S/MURO ML ### 7,137 7,008 7,018 7,056 7,041
6.4 GOTERA EN MORTERO 1:4 ML ### 8,480 8,352 8,361 8,399 8,385
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,147 7,147 7,147 7,147 7,147
6.6 MALLA BAJO ENTRAMADO M2 ### 14,002 14,002 14,002 14,002 14,002
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,033 24,624 24,655 24,776 24,730
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,111 14,906 14,921 14,982 14,959
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,884 21,522 21,549 21,656 21,616
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,226 13,045 13,058 13,112 13,092
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,142 20,733 20,763 20,885 20,839
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,855 12,650 12,666 12,726 12,703
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,884 21,522 21,549 21,656 21,616
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,226 13,045 13,058 13,112 13,092
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,467 22,176 22,197 22,284 22,251
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,516 13,371 13,381 13,425 13,408
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,156 17,880 17,900 17,982 17,951
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,073 10,935 10,946 10,986 10,971
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,591 17,279 17,302 17,394 17,360
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,791 10,635 10,646 10,693 10,675
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,663 22,300 22,327 22,434 22,394
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,595 13,414 13,427 13,481 13,461
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,920 21,511 21,542 21,663 21,617
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,224 13,020 13,035 13,095 13,073
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,201 17,889 17,912 18,005 17,970
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,078 10,922 10,934 10,980 10,963
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,810 22,401 22,431 22,552 22,507
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,073 13,869 13,884 13,944 13,922

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 27,928 27,410 27,448 27,602 27,544
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7.2 TELA IMPERMEABLE) M2 ### 87,542 86,457 86,538 86,859 86,738
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 58,438 58,438 58,438 58,438 58,438
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,095 23,095 23,095 23,095 23,095
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ###
p 36,337 36,337 36,337 36,337 36,337
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### i 85,553 85,553 85,553 85,553 85,553
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### o 66,876 66,876 66,876 66,876 66,876
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,669 38,669 38,669 38,669 38,669
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 89,689 89,689 89,689 89,689 89,689
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 107,200 107,200 107,200 107,200 107,200
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 157,796 157,796 157,796 157,796 157,796
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 61,930 61,930 61,930 61,930 61,930
7.13 CANAL PVC AMAZONAS ML ### 85,827 85,827 85,827 85,827 85,827
7.14 CANAL PVC RAINGO ML ### 77,931 77,931 77,931 77,931 77,931
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 139,282 139,282 139,282 139,282 139,282
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 81,474 81,474 81,474 81,474 81,474
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 59,736 59,736 59,736 59,736 59,736
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,585 33,585 33,585 33,585 33,585
7.19 TEJA DE BARRO M2 ### 62,093 61,449 61,496 61,687 61,616
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 49,811 49,811 49,811 49,811 49,811
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 45,636 45,636 45,636 45,636 45,636
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,179 38,179 38,179 38,179 38,179
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 37,410 37,410 37,410 37,410 37,410
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,696 37,696 37,696 37,696 37,696
7.25 TEJA TERMOACÚSTICA M2 ### 53,322 53,322 53,322 53,322 53,322
7.26 TEJA PLÁSTICA No.6 M2 ### 46,816 46,816 46,816 46,816 46,816
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 86,040 86,040 86,040 86,040 86,040
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 159,326 159,326 159,326 159,326 159,326
7.29 TEJA SIN TRASLAPO M2 ### 71,455 71,455 71,455 71,455 71,455
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,028 44,028 44,028 44,028 44,028
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,622 34,622 34,622 34,622 34,622
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM) M2 ### 60,909 60,909 60,909 60,909 60,909
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,661 20,661 20,661 20,661 20,661
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,967 24,967 24,967 24,967 24,967
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,136 27,136 27,136 27,136 27,136
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,085 35,085 35,085 35,085 35,085
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,025 23,025 23,025 23,025 23,025
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,281 54,281 54,281 54,281 54,281
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 378,516 378,516 378,516 378,516 378,516
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 422,485 422,485 422,485 422,485 422,485
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ###
i 285,616 285,616 285,616 285,616 285,616
p
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### i 305,735 305,735 305,735 305,735 305,735
o
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 483,432 461,139 462,790 469,396 466,919
8.2 CONCRETO 3500 PSI M3 ### 423,022 402,369 403,898 410,019 407,723
8.3 CONCRETO 3000 PSI M3 ### 421,173 399,791 401,374 407,711 405,334
8.4 CONCRETO 2500 PSI M3 ### 373,458 351,768 353,374 359,802 357,391
8.5 CONCRETO 2000 PSI M3 ### 349,679 327,316 328,972 335,599 333,114
8.6 CONCRETO 1500 PSI M3 ### 319,533 296,413 298,125 304,976 302,407
8.7 MORTERO SECO 1:10 M3 ### 265,215 247,429 248,746 254,016 252,040
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 486,251 468,981 470,260 475,377 473,458
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 450,907 431,434 432,877 438,647 436,483
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 515,064 496,852 498,202 503,598 501,574
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 755,684 737,472 738,822 744,218 742,194

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 129,504 129,504 129,504 129,504 129,504
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,236 4,107 4,116 4,155 4,140
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 144,485 144,485 144,485 144,485 144,485
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 177,424 177,424 177,424 177,424 177,424
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 259,756 259,756 259,756 259,756 259,756
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 289,229 289,229 289,229 289,229 289,229
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 318,734 318,734 318,734 318,734 318,734
9.8 HOJA PUERTA FORTEC 0.81 UN ### 211,940 211,940 211,940 211,940 211,940
9.9 HOJA PUERTA FORTEC 0.91 UN ### 240,356 240,356 240,356 240,356 240,356
9.10 HOJA PUERTA FORTEC 1.50 UN ### 354,018 354,018 354,018 354,018 354,018
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 133,798 133,798 133,798 133,798 133,798
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 177,842 177,842 177,842 177,842 177,842
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 197,733 197,733 197,733 197,733 197,733
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 504,620 504,620 504,620 504,620 504,620
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,103 44,103 44,103 44,103 44,103
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,214 27,214 27,214 27,214 27,214
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,225 104,225 104,225 104,225 104,225
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 128,922 128,922 128,922 128,922 128,922
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 100,080 100,080 100,080 100,080 100,080
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,803 30,803 30,803 30,803 30,803
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ###
i 30,803 30,803 30,803 30,803 30,803
p
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### i 29,183 29,183 29,183 29,183 29,183
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### o 44,543 44,543 44,543 44,543 44,543
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 55,306 55,306 55,306 55,306 55,306
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 66,786 66,786 66,786 66,786 66,786
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 80,419 80,419 80,419 80,419 80,419
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 380,535 380,535 380,535 380,535 380,535
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 265,737 265,737 265,737 265,737 265,737
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,216 35,216 35,216 35,216 35,216
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,261 45,261 45,261 45,261 45,261
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 55,306 55,306 55,306 55,306 55,306
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 69,656 69,656 69,656 69,656 69,656

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 79,862 79,862 79,862 79,862 79,862
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 224,162 224,162 224,162 224,162 224,162
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 84,243 84,243 84,243 84,243 84,243
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 149,707 149,707 149,707 149,707 149,707
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 143,103 143,103 143,103 143,103 143,103
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 93,930 93,930 93,930 93,930 93,930
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 221,941 221,941 221,941 221,941 221,941
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,279 115,279 115,279 115,279 115,279
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,897 6,897 6,897 6,897 6,897
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2")
M2 ### 103,002 103,002 103,002 103,002 103,002
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00
10,10(1) MTS M2 ### 127,347 127,347 127,347 127,347 127,347
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,443 42,443 42,443 42,443 42,443
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 572,404 572,404 572,404 572,404 572,404
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 205,185 205,185 205,185 205,185 205,185
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 229,025 229,025 229,025 229,025 229,025
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS) M2 ### 521,150 521,150 521,150 521,150 521,150
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 133,357 133,357 133,357 133,357 133,357
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 417,804 417,804 417,804 417,804 417,804
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,309 6,309 6,309 6,309 6,309
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ###
i 293,014 293,014 293,014 293,014 293,014
p
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### i 127,199 127,199 127,199 127,199 127,199
10.21 REJILLA PISO 0.30 M M2 ### o 90,613 90,613 90,613 90,613 90,613
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,353 93,353 93,353 93,353 93,353
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,961 10,961 10,961 10,961 10,961
SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
KG ### 12,193 12,193 12,193 12,193 12,193
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,635 9,635 9,635 9,635 9,635
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 229,687 229,687 229,687 229,687 229,687
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 278,169 278,169 278,169 278,169 278,169
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,095 23,095 23,095 23,095 23,095
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 36,337 36,337 36,337 36,337 36,337
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,733 34,733 34,733 34,733 34,733
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,651 44,651 44,651 44,651 44,651
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 92,397 92,397 92,397 92,397 92,397
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 231,136 231,136 231,136 231,136 231,136
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,362 44,362 44,362 44,362 44,362
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 36,375 36,375 36,375 36,375 36,375
11.13 NIPLE PASAMURO 2" UN ### 68,717 68,717 68,717 68,717 68,717
11.14 NIPLE PASAMURO 4" UN ### 102,835 102,835 102,835 102,835 102,835
11.15 PUNTO AGUA CALIENTE CPVC UN ### 87,255 87,255 87,255 87,255 87,255
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 63,045 63,045 63,045 63,045 63,045
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 67,203 67,203 67,203 67,203 67,203
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 84,952 84,952 84,952 84,952 84,952
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 68,858 68,858 68,858 68,858 68,858
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 86,607 86,607 86,607 86,607 86,607
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ###
i 92,758 92,758 92,758 92,758 92,758
p
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### i 77,399 77,399 77,399 77,399 77,399
11.23 RED SUMINISTRO CPVC 1/2" ML ### o 13,067 13,067 13,067 13,067 13,067
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,484 18,484 18,484 18,484 18,484
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 24,116 24,116 24,116 24,116 24,116
11.26 RED SUMINISTRO PVC 1" ML ### 14,842 14,842 14,842 14,842 14,842
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,830 8,830 8,830 8,830 8,830
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 53,934 53,934 53,934 53,934 53,934
11.29 RED SUMINISTRO PVC 2" ML ### 34,429 34,429 34,429 34,429 34,429
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,082 11,082 11,082 11,082 11,082
11.31 RED SANITARIA PVC-S 2" ML ### 26,514 26,514 26,514 26,514 26,514
11.32 RED SANITARIA PVC-S 3" ML ### 36,852 36,852 36,852 36,852 36,852
11.33 RED SANITARIA PVC-S 4" ML ### 50,056 50,056 50,056 50,056 50,056
11.34 RED SANITARIA PVC-S 6" ML ### 94,038 94,038 94,038 94,038 94,038
11.35 REGISTRO 1" UN ### 113,780 113,780 113,780 113,780 113,780
11.36 REGISTRO 1/2" UN ### 63,356 63,356 63,356 63,356 63,356
11.37 REGISTRO 3/4" UN ### 80,861 80,861 80,861 80,861 80,861
11.38 REGISTRO 1 1/2" UN ### 195,901 195,901 195,901 195,901 195,901
11.39 REGISTRO 2 1/2" UN ### 404,891 404,891 404,891 404,891 404,891
11.40 REGISTRO 2" UN ### 298,782 298,782 298,782 298,782 298,782
11.41 REVENTILACIÓN 2" ML ### 18,437 18,437 18,437 18,437 18,437
11.42 REVENTILACIÓN 3" ML ### 23,286 23,286 23,286 23,286 23,286

11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 181,230 181,230 181,230 181,230 181,230

11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 295,820 295,820 295,820 295,820 295,820

11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 492,889 492,889 492,889 492,889 492,889

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11.46 SOPORTES) ML ### 42,627 42,627 42,627 42,627 42,627

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.47 SOPORTES) ML ### 50,301 50,301 50,301 50,301 50,301

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.48 SOPORTES) ML ### 64,195 64,195 64,195 64,195 64,195
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11.49 ML ### p 73,134 73,134 73,134 73,134 73,134
SOPORTES) i
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y o
11.50 SOPORTES) ML ### 94,303 94,303 94,303 94,303 94,303
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11.51 SOPORTES) ML ### 108,537 108,537 108,537 108,537 108,537

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y


11.52 SOPORTES) ML ### 160,260 160,260 160,260 160,260 160,260
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,353 64,353 64,353 64,353 64,353
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,622 64,622 64,622 64,622 64,622
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,924 41,924 41,924 41,924 41,924
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 51,812 51,812 51,812 51,812 51,812
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,408 4,408 4,408 4,408 4,408
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,967 6,967 6,967 6,967 6,967
11.59 GABINETE TIPO III UN ### 1,073,737 1,073,737 1,073,737 1,073,737 1,073,737
11.60 GABINETE TIPO I UN ### 818,282 818,282 818,282 818,282 818,282
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,772,337 2,772,337 2,772,337 2,772,337 2,772,337
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,310,210 2,310,210 2,310,210 2,310,210 2,310,210
11.63 VÁLVULA MARIPOSA 3" UN ### 665,799 665,799 665,799 665,799 665,799
11.64 VÁLVULA MARIPOSA 4" UN ### 863,571 863,571 863,571 863,571 863,571
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 334,549 334,549 334,549 334,549 334,549

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 384,061 384,061 384,061 384,061 384,061
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 61,033 61,033 61,033 61,033 61,033
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 72,344 72,344 72,344 72,344 72,344
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 80,208 80,208 80,208 80,208 80,208
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 94,589 94,589 94,589 94,589 94,589
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 57,327 57,327 57,327 57,327 57,327
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 65,392 65,392 65,392 65,392 65,392
12.8 STRIP TELEFÓNICO 10 PARES UN ### 150,338 150,338 150,338 150,338 150,338
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 58,902 58,902 58,902 58,902 58,902
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 135,502 135,502 135,502 135,502 135,502
12.11 SALIDA T.V PVC COMPLETA. UN ### 80,927 80,927 80,927 80,927 80,927
12.12 SALIDA BIFÁSICA C.N. UN ### 48,002 48,002 48,002 48,002 48,002
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 100,906 100,906 100,906 100,906 100,906
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ###
i 430,570 430,570 430,570 430,570 430,570
p
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### i 574,098 574,098 574,098 574,098 574,098
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### o 3,719 3,719 3,719 3,719 3,719
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,908 4,908 4,908 4,908 4,908
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,647 7,647 7,647 7,647 7,647
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,668 13,668 13,668 13,668 13,668
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 287,490 287,490 287,490 287,490 287,490
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 81,027 81,027 81,027 81,027 81,027
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 110,036 110,036 110,036 110,036 110,036
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,326 44,326 44,326 44,326 44,326
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,468,779 1,468,779 1,468,779 1,468,779 1,468,779
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,088,165 1,088,165 1,088,165 1,088,165 1,088,165
12.26 POSTE METÁLICO 6M UN ### 1,371,066 1,371,066 1,371,066 1,371,066 1,371,066
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 639,782 639,782 639,782 639,782 639,782
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 116,053 116,053 116,053 116,053 116,053
12.29 LUMINARIA 70W SODIO UN ### 537,005 537,005 537,005 537,005 537,005
12.30 LUMINARIA 150W SODIO UN ### 672,157 672,157 672,157 672,157 672,157
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,777,357 1,777,357 1,777,357 1,777,357 1,777,357
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,308,501 1,308,501 1,308,501 1,308,501 1,308,501

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,983 41,282 41,334 41,542 41,464
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,991 41,290 41,342 41,550 41,472
13.3 ALISTADO PARA LISTÓN M2 ### 15,266 15,126 15,136 15,178 15,162
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 30,390 28,989 29,093 29,508 29,352
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 90,988 89,587 89,691 90,106 89,950
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,358 26,911 26,944 27,077 27,027
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 60,238 58,069 58,230 58,873 58,632
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 83,950 80,480 80,737 81,766 81,380
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,997 31,997 31,997 31,997 31,997
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,920 23,920 23,920 23,920 23,920
13.11 PERMA PLY 2 CAPAS M2 ### 27,985 27,985 27,985 27,985 27,985
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 49,152 47,200 47,345 47,923 47,706
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 57,663 55,277 55,454 56,161 55,895
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 83,812 80,125 80,398 81,491 81,081
13.15 TRITURADO FINO 1/2 M3 ### 110,795 94,196 95,424 100,344 98,499
13.16 TRITURADO GRUESO 3/4 M3 ### 118,746 98,594 102,032 101,459 108,241
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
p
14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS i
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### o 60,335 60,055 60,075 60,158 60,127
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,841 35,701 35,711 35,753 35,737
14.3 ADOQUÍN CONCRETO 6CM M2 ### 69,170 68,470 68,522 68,729 68,651
14.4 ADOQUÍN CONCRETO 8CM M2 ### 72,720 72,020 72,072 72,279 72,201
14.5 ADOQUÍN GRES PEATONAL M2 ### 77,239 76,538 76,590 76,798 76,720
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO M2 ### 79,884 79,604 79,625 79,708 79,677
14.7 GRAVILLA PARA GRADAS ML ### 38,069 37,765 37,787 37,877 37,844
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 174,627 173,367 173,460 173,834 173,694
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 48,019 47,271 47,326 47,548 47,465
14.10 GUARDAESCOBA EN GRANITO ML ### 45,405 45,405 45,405 45,405 45,405
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,618 10,314 10,337 10,427 10,393
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,988 9,988 9,988 9,988 9,988
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,430 13,430 13,430 13,430 13,430
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,029 11,029 11,029 11,029 11,029
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,637 18,637 18,637 18,637 18,637
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 36,539 36,539 36,539 36,539 36,539
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,471 9,471 9,471 9,471 9,471
14.18 LISTÓN M.H. AMARILLO M2 ### 78,209 78,209 78,209 78,209 78,209
14.19 PASO ESCALERA GRANITO ML ### 124,896 123,916 123,988 124,279 124,170
14.20 PIRLANES ALUMINIO ML ### 7,694 7,694 7,694 7,694 7,694
14.21 PIRLANES LADRILLO ML ### 33,389 33,131 33,150 33,227 33,198
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,646 48,646 48,646 48,646 48,646
14.23 PISO VINILO TRÁFICO PESADO M2 ### 56,648 56,648 56,648 56,648 56,648
14.24 PULIDA LACADA PISO MADERA M2 ### 51,487 51,487 51,487 51,487 51,487
14.25 TABLETA DE GRES 25X25 M2 ### 52,286 52,006 52,027 52,110 52,079
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,783 58,503 58,524 58,607 58,576
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,321 11,321 11,321 11,321 11,321
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 52,349 51,962 51,991 52,105 52,062
14.29 JABONERA PORCELANA ACUARIO UN ### 21,816 21,816 21,816 21,816 21,816
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14.30 Y PERCHA SIMPLE)
UN ### 130,999 130,999 130,999 130,999 130,999
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,281 10,281 10,281 10,281 10,281
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,752 23,752 23,752 23,752 23,752
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,111 15,111 15,111 15,111 15,111
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ###
i 14,670 14,670 14,670 14,670 14,670
p
14.35 REMATES BOCEL ALUMINIO ML ### i 8,799 8,799 8,799 8,799 8,799
14.36 REMATES BOCEL PORCELANA ML ### o 8,960 8,960 8,960 8,960 8,960
14.37 TAPA REGISTRO 20X20 UN ### 20,068 20,068 20,068 20,068 20,068
14.38 TAPA REGISTRO 6X6 UN ### 18,257 18,257 18,257 18,257 18,257
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,033 20,033 20,033 20,033 20,033
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO
14.40 EN SITIO M2 ### 23,159 23,159 23,159 23,159 23,159
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 69,323 69,043 69,064 69,147 69,116
14.42 MEDIA CAÑA EN GRANITO ML ### 82,689 82,689 82,689 82,689 82,689
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,860 34,860 34,860 34,860 34,860
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,936 13,936 13,936 13,936 13,936
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 109,001 109,001 109,001 109,001 109,001
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 131,586 131,586 131,586 131,586 131,586

15 CIELO RASO
15.1 APLIQUE YESO ML ### 77,639 77,639 77,639 77,639 77,639
15.2 ARMADURA MADERA Y MALLA M2 ### 37,106 37,106 37,106 37,106 37,106
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,197 58,197 58,197 58,197 58,197
15.4 CIELO RASO DURACUSTIC M2 ### 71,682 71,682 71,682 71,682 71,682
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,396 53,396 53,396 53,396 53,396
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,510 99,510 99,510 99,510 99,510
15.7 CORNISAS YESO ML ### 52,184 52,184 52,184 52,184 52,184
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 110,250 110,250 110,250 110,250 110,250
15.9 MALLA CON VENA M2 ### 13,900 13,900 13,900 13,900 13,900

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 107,676 81,975 92,255 71,694 107,676
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ###
i 119,746 101,701 103,039 108,385 106,380
p
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO i
16.10 MECÁNICAMENTE M3 ### 147,095 147,095 148,809 145,382 183,077
o
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 113,068 75,446 85,727 77,087 113,068
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 137,084 137,084 138,797 135,370 173,065
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 144,065 144,065 145,778 142,351 180,046

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 321,413 321,413 321,413 321,413 321,413

17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 951,548 951,548 951,548 951,548 951,548

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 514,698 514,698 514,698 514,698 514,698
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 147,391 147,391 147,391 147,391 147,391
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 207,609 207,609 207,609 207,609 207,609

17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 192,648 192,648 192,648 192,648 192,648
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 426,752 426,752 426,752 426,752 426,752
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,094,678 1,094,678 1,094,678 1,094,678 1,094,678
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 309,396 309,396 309,396 309,396 309,396
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 218,288 218,288 218,288 218,288 218,288
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 85,624 85,624 85,624 85,624 85,624
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 265,068 265,068 265,068 265,068 265,068
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 391,517 391,517 391,517 391,517 391,517

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,660 8,660 8,660 8,660 8,660
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,229 3,229 3,229 3,229 3,229
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,440 11,440 11,440 11,440 11,440
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,083 44,083 44,083 44,083 44,083
18.5 CARBURO SOBRE PAÑETES M2 ### 6,003 6,003 6,003 6,003 6,003
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 70,071 70,071 70,071 70,071 70,071
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,556 3,556 3,556 3,556 3,556
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ###
i 2,889 2,889 2,889 2,889 2,889
p
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### i 14,432 14,432 14,432 14,432 14,432
18.10 ESMALTE SOBRE MADERA LINEAL ML ### o 4,194 4,194 4,194 4,194 4,194
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,224 15,224 15,224 15,224 15,224
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,045 6,045 6,045 6,045 6,045
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,859 6,859 6,859 6,859 6,859
18.14 ESTUCO M2 ### 7,192 7,192 7,192 7,192 7,192
18.15 ESTUCO (LINEAL) ML ### 4,491 4,491 4,491 4,491 4,491
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,037 16,037 16,037 16,037 16,037
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,897 9,897 9,897 9,897 9,897
18.18 LACA PISOS MADERA M2 ### 23,340 23,340 23,340 23,340 23,340
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,769 2,769 2,769 2,769 2,769
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,781 12,781 12,781 12,781 12,781
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,442 3,442 3,442 3,442 3,442
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,059 13,059 13,059 13,059 13,059
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,328 7,328 7,328 7,328 7,328
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,584 4,584 4,584 4,584 4,584
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,841 22,841 22,841 22,841 22,841
18.26 PINTURA EPÓXICA M2 ### 13,062 13,062 13,062 13,062 13,062
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,040 8,040 8,040 8,040 8,040

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,493,703 6,493,703 6,493,703 6,493,703 6,493,703
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR) UN ### 11,473,306 11,473,306 11,473,306 11,473,306 11,473,306
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,002,321 3,002,321 3,002,321 3,002,321 3,002,321
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,812,391 9,812,391 9,812,391 9,812,391 9,812,391
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,190,384 9,190,384 9,190,384 9,190,384 9,190,384
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,769 2,769 2,769 2,769 2,769
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 920,032 920,032 920,032 920,032 920,032
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 92,129 92,129 92,129 92,129 92,129
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,667,211 1,666,988 1,667,004 1,667,070 1,667,046
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 716,902 711,557 711,953 713,537 712,943

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,723 30,723 30,723 30,723 30,723
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 45,927 45,927 45,927 45,927 45,927
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ###
i 57,035 57,035 57,035 57,035 57,035
p
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### i 18,378 18,378 18,378 18,378 18,378
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### o 22,333 22,333 22,333 22,333 22,333
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,540 30,540 30,540 30,540 30,540
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,928 26,928 26,928 26,928 26,928
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,408 28,408 28,408 28,408 28,408
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,618 35,618 35,618 35,618 35,618
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,683 18,683 18,683 18,683 18,683
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,535 24,535 24,535 24,535 24,535
20.12 VÁLVULA DE BOLA GAS 1" UN ### 37,838 37,838 37,838 37,838 37,838
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 291,041 291,041 291,041 291,041 291,041
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 335,103 335,103 335,103 335,103 335,103
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 349,296 349,296 349,296 349,296 349,296
20.16 ACOMETIDA GAS 1/2" ML ### 323,341 323,341 323,341 323,341 323,341

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 236,118 236,118 236,118 236,118 236,118
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 36,328 36,328 36,328 36,328 36,328
21.3 SIRENA DE 110 V UN ### 109,786 109,786 109,786 109,786 109,786
21.4 CÁMARA CCTV UN ### 275,309 275,309 275,309 275,309 275,309
21.5 PARLANTE-CIELO FALSO UN ### 54,647 54,647 54,647 54,647 54,647
21.6 AMPLIFICADOR 100W UN ### 608,535 608,535 608,535 608,535 608,535
21.7 AMPLIFICADOR 300W UN ### 1,516,564 1,516,564 1,516,564 1,516,564 1,516,564
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,546 45,546 45,546 45,546 45,546
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 236,629 236,629 236,629 236,629 236,629
21.10 TOMA PARA MICRÓFONO UN ### 45,898 45,898 45,898 45,898 45,898
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,976 3,976 3,976 3,976 3,976
21.12 SPLITERS UN ### 6,733 6,733 6,733 6,733 6,733
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,160 19,160 19,160 19,160 19,160
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,175 25,175 25,175 25,175 25,175
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 32,764 32,764 32,764 32,764 32,764
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 130,559 130,559 130,559 130,559 130,559
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 34,043 34,043 34,043 34,043 34,043
21.18 BANDEJA PORTACABLES PARA RACK UN ### 111,711 111,711 111,711 111,711 111,711
21.19 RACK 2' X 24" UN ### 191,538 191,538 191,538 191,538 191,538
21.20 RACK 3' X 24" UN ### 303,779 303,779 303,779 303,779 303,779
21.21 RACK 5' X 24" UN ### 376,104 376,104 376,104 376,104 376,104
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
21.22 RACK 7' X 24" UN ###
i 411,624 411,624 411,624 411,624 411,624
p
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### i 598,908 598,908 598,908 598,908 598,908
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### o 351,676 351,676 351,676 351,676 351,676
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 110,615 110,615 110,615 110,615 110,615
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,794 14,794 14,794 14,794 14,794
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 30,280 30,280 30,280 30,280 30,280
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,252 5,252 5,252 5,252 5,252
21.29 CANALETA METÁLICA 4X6 CMS ML ### 36,815 36,815 36,815 36,815 36,815
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,509 38,509 38,509 38,509 38,509
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,354 39,354 39,354 39,354 39,354
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,656 25,656 25,656 25,656 25,656
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,440 28,440 28,440 28,440 28,440
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,611 29,611 29,611 29,611 29,611
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 50,177 50,177 50,177 50,177 50,177
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 651,869 651,869 651,869 651,869 651,869
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 333,682 333,682 333,682 333,682 333,682
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 92,217 92,217 92,217 92,217 92,217
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,922 1,922 1,922 1,922 1,922
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,891 8,891 8,891 8,891 8,891
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,338 13,338 13,338 13,338 13,338
21.42 CABLE TELEFÓNICO 40 PARES ML ### 22,324 22,324 22,324 22,324 22,324
21.43 CABLE TELEVISIÓN RG6 ML ### 4,109 4,109 4,109 4,109 4,109
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,866 22,866 22,866 22,866 22,866
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 33,469 33,469 33,469 33,469 33,469
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,103 20,103 20,103 20,103 20,103
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 16,150 16,150 16,150 16,150 16,150
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 660,708 660,708 660,708 660,708 660,708
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
URBANISMO
p
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 96,641 96,641 96,641 96,641 96,641
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 545,500 545,500 545,500 545,500 545,500
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,164,403 1,164,403 1,164,403 1,164,403 1,164,403
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 133,301 133,301 133,301 133,301 133,301
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 813,379 813,379 813,379 813,379 813,379
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,751,240 1,751,240 1,751,240 1,751,240 1,751,240
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,705 13,705 13,705 13,705 13,705
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,969 16,969 16,969 16,969 16,969
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,377 21,377 21,377 21,377 21,377
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 23,423 23,423 23,423 23,423 23,423
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 28,136 28,136 28,136 28,136 28,136
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 28,136 28,136 28,136 28,136 28,136
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 114,013 114,013 114,013 114,013 114,013
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 132,026 132,026 132,026 132,026 132,026
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 408,742 408,742 408,742 408,742 408,742
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 153,539 153,539 153,539 153,539 153,539
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 253,104 253,104 253,104 253,104 253,104
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,120,834 1,120,834 1,120,834 1,120,834 1,120,834
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,291,469 1,291,469 1,291,469 1,291,469 1,291,469
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,958 14,958 14,958 14,958 14,958
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,175 13,175 13,175 13,175 13,175
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 33,006 33,006 33,006 33,006 33,006
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 130,384 130,384 130,384 130,384 130,384
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 194,487 194,487 194,487 194,487 194,487
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 31,627 31,627 31,627 31,627 31,627
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 109,198 109,198 109,198 109,198 109,198
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 162,136 162,136 162,136 162,136 162,136
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 32,034 32,034 32,034 32,034 32,034
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 66,130 66,130 66,130 66,130 66,130
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 267,020 267,020 267,020 267,020 267,020
1.32 UNIÓN REPARACION PVC 4" UN ### 77,212 77,212 77,212 77,212 77,212
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 310,779 310,779 310,779 310,779 310,779
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 185,526 185,526 185,526 185,526 185,526
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 530,304 530,304 530,304 530,304 530,304
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
1.36 VÁLVULA COMPUERTA ELÁSTICA 6"
i
UN ### 1,423,266 1,423,266 1,423,266 1,423,266 1,423,266
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 2,103,162 2,103,162 2,103,162 2,103,162 2,103,162
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,064 11,064 11,064 11,064 11,064
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,229 25,229 25,229 25,229 25,229
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 111,580 92,189 93,626 99,371 97,217
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 102,641 76,940 87,221 66,660 102,641
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 118,128 80,506 90,787 82,147 118,128
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 59,590 59,590 60,614 58,565 81,111
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 60,602 60,602 61,647 59,557 82,542
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 107,781 91,027 92,267 97,232 95,370

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 121,892 121,892 121,892 121,892 121,892
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,272,768 1,272,768 1,272,768 1,272,768 1,272,768
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 159,358 159,358 159,358 159,358 159,358
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,474,234 1,474,234 1,474,234 1,474,234 1,474,234
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,027,374 1,027,374 1,027,374 1,027,374 1,027,374
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,484 63,484 63,484 63,484 63,484
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 120,999 120,999 120,999 120,999 120,999
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 285,932 285,932 285,932 285,932 285,932
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 285,925 285,925 285,925 285,925 285,925
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 459,146 459,146 459,146 459,146 459,146
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 121,050 121,050 121,050 121,050 121,050
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 121,050 121,050 121,050 121,050 121,050
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 285,932 285,932 285,932 285,932 285,932
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 285,932 285,932 285,932 285,932 285,932
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 459,146 459,146 459,146 459,146 459,146
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 459,399 459,399 459,399 459,399 459,399
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 747,190 747,190 747,190 747,190 747,190
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,199,653 1,199,653 1,199,653 1,199,653 1,199,653
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 74,089 74,089 74,089 74,089 74,089
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 384,098 384,098 384,098 384,098 384,098
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 432,187 432,187 432,187 432,187 432,187
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,195,489 1,195,489 1,195,489 1,195,489 1,195,489
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 69,898 69,725 69,738 69,789 69,770
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 348,013 348,013 348,013 348,013 348,013
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 53,065 53,065 53,065 53,065 53,065
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 75,129 75,129 75,129 75,129 75,129
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 108,504 108,504 108,504 108,504 108,504
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 166,598 166,598 166,598 166,598 166,598
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 267,915 267,915 267,915 267,915 267,915
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 387,866 387,866 387,866 387,866 387,866
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 491,100 491,100 491,100 491,100 491,100
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 645,818 645,818 645,818 645,818 645,818
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 888,958 888,958 888,958 888,958 888,958

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO) UN ### 700,847 688,018 688,967 692,770 691,343
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE
4.2 INTERNO E=1.5CM Y CAÑUELA) ML ### 684,745 675,822 676,483 679,127 678,135
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.3 (INCLUYE ARO Y TAPA HF)
UN ### 748,661 740,108 740,741 743,276 742,325

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON


4.4 REFUERZO) UN ### 833,758 817,721 818,909 823,661 821,879

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE


4.5 INTERNO E=1.5CM Y CAÑUELA) ML ### 975,624 963,058 963,989 967,713 966,316
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.6 (INCLUYE ARO Y TAPA HF) UN ### 865,300 853,540 854,411 857,896 856,589
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,021,388 1,015,220 1,015,679 1,017,504 1,016,820
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,486,954 1,468,982 1,470,315 1,475,638 1,473,643
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,057,872 2,023,985 2,026,494 2,036,537 2,032,770
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,727,741 2,671,412 2,675,582 2,692,276 2,686,015
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,936,658 1,936,658 1,936,658 1,936,658 1,936,658
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,106,486 4,106,486 4,106,486 4,106,486 4,106,486
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN) UN ### 143,322 142,958 142,985 143,093 143,052

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 77,130 76,227 76,294 76,562 76,461
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 91,482 90,579 90,646 90,914 90,813
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 58,430 56,152 56,321 56,996 56,743
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###
i 63,440 61,195 61,361 62,026 61,777
p
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### i 63,634 61,465 61,626 62,269 62,028
5.6 BORDE SEPARADOR VERDE A-170 ML ### o 269,057 268,693 268,720 268,828 268,788
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,807 18,534 18,554 18,635 18,604
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 41,737 40,132 40,251 40,727 40,548
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 87,552 87,357 87,372 87,430 87,408
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 582,038 576,731 577,124 578,696 578,107
5.11 LOSETA PREFABRICADA A-40 M2 ### 65,642 64,809 64,870 65,117 65,025
5.12 LOSETA PREFABRICADA A-60 M2 ### 95,892 95,058 95,120 95,367 95,274
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 34,664 33,766 33,832 34,098 33,998
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 56,043 54,225 54,360 54,898 54,696
5.15 SARDINEL PREFABRICADO A-10 ML ### 103,673 103,478 103,691 103,351 107,708
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 63,159 62,655 62,692 62,841 62,785

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 213,701 212,632 212,711 213,028 212,909
6.2 BANCA EN CONCRETO M-30 UN ### 704,786 703,289 703,400 703,844 703,677
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 225,816 225,592 225,609 225,675 225,650
6.4 BOLARDO M-60 CONCRETO UN ### 169,750 168,467 168,562 168,942 168,800
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 171,618 170,335 170,430 170,810 170,668
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 201,719 200,377 200,476 200,874 200,725
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 61,148 60,457 60,509 60,713 60,636
6.8 BORDILLO PREFABRICADO A-80 ML ### 71,886 71,113 71,170 71,399 71,313
6.9 CANECA M-120 UN ### 329,838 329,665 329,678 329,729 329,710
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 869,091 868,450 868,497 868,687 868,616
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,576,697 3,576,269 3,576,301 3,576,428 3,576,380
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,679,538 3,679,110 3,679,142 3,679,269 3,679,221
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 513,935 513,487 513,521 513,653 513,603
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 680,933 679,144 679,276 679,806 679,607
6.15 BANCA EN MADERA M-50 UN ### 564,968 564,968 564,968 564,968 564,968
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 260,050 259,408 259,456 259,646 259,575
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 609,073 608,641 608,673 608,801 608,753
6.18 POSTE HISTÓRICO M-131 UN ### 6,799,745 6,796,538 6,796,776 6,797,726 6,797,370

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,272 4,272 4,272 4,272 4,272
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,397 45,397 45,397 45,397 45,397
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
7.3 SEÑAL DOBLE DE CICLORUTA UN ###
i 330,917 330,735 330,749 330,803 330,782
p
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### i 520,274 519,379 519,446 519,711 519,611
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### o 245,564 245,382 245,396 245,450 245,430
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 260,994 260,812 260,826 260,880 260,860
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 272,678 272,496 272,510 272,564 272,544
7.8 TACHAS REFLECTIVAS UN ### 14,242 14,242 14,242 14,242 14,242
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,219 15,219 15,219 15,219 15,219
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 124,389 124,389 124,389 124,389 124,389
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
VÍAS (SEGÚN ESPECIFICACIONESp TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES
1.2 201 P A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO
1.4 200.2 DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.5 201.7 UNA DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES M3-KM### 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,055 36,055 36,055 36,055 36,055
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 12,832 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
2.9 600.1 UNA DISTANCIA MENOR DE 5 KM) M3 ### 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A
2.10 600.2 UNA DISTANCIA MENOR DE 5 KM) M3 ### 65,891 65,891 65,891 65,891 65,891
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 80,664 80,664 80,664 80,664 80,664
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE
2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 19,035 19,035 19,035 19,035 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE
2.13 600.4 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 39,738 39,738 39,738 39,738 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO
2.14 600.5 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 31,203 31,203 31,203 31,203 31,203
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE
2.15 600.5 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 53,644 53,644 53,644 53,644 53,644
i
o
3 NORMA INV ESTRUCTURA DE PAVIMENTO
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 137,084 137,084 138,797 135,370 173,065
3.3 330.1 BASE GRANULAR M3 ### 144,065 144,065 145,778 142,351 180,046
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,382 3,382 3,382 3,382 3,382
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,157 1,157 1,157 1,157 1,157
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 238,269 233,162 233,540 235,053 234,486
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 69,895 68,621 68,716 69,093 68,952
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 633,224 651,347 618,397 700,772 677,707
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 659,999 678,122 645,172 727,547 704,482
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 697,877 715,999 683,049 765,424 742,359
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 667,437 685,559 652,609 734,984 711,919
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 264,037 270,595 254,079 286,123 296,895
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 301,064 301,064 302,777 299,350 337,045
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 292,639 292,639 294,353 290,926 328,621
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 40,236 40,236 40,236 40,236 40,236
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 179,848 179,848 179,848 179,848 179,848
3.15 311.1 AFIRMADO M3 ### 113,068 75,446 85,727 77,087 113,068
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,493 12,123 12,151 12,260 12,219
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,082 4,898 4,911 4,966 4,946
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3.18 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 663,062 642,878 644,373 650,354 648,111
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y
3.19 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 697,109 676,022 677,583 683,832 681,489
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y
3.20 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 719,674 698,005 699,609 706,031 703,622
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,218 7,218 7,218 7,218 7,218
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 90,505 90,505 91,955 89,055 120,951

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 938,806 915,911 917,606 924,391 921,846
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ###
i 811,301 788,785 790,453 797,125 794,623
p
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### i 858,205 834,798 836,531 843,468 840,867
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### o 591,256 570,397 571,941 578,123 575,804
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 688,254 666,569 668,174 674,601 672,190
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 589,389 567,793 569,392 575,792 573,391
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 686,313 663,862 665,524 672,178 669,682
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 748,420 726,824 728,423 734,823 732,422
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 609,334 586,882 588,545 595,198 592,703
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 792,833 770,382 772,045 778,698 776,203
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P ACERO A-36 KG ### 12,175 12,175 12,175 12,175 12,175
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.12 650 P ACERO A-588 GRADO B KG ### 15,716 15,716 15,716 15,716 15,716
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,845 1,845 1,845 1,845 1,845
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO
4.14 621.1 TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,791,003 2,791,003 2,791,003 2,791,003 2,791,003
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN
4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,201,218 4,162,056 4,164,956 4,176,561 4,172,209
REFUERZO Y ANILLOS)

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,750,339 1,728,957 1,730,540 1,736,877 1,734,500
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 91,348 91,348 91,348 91,348 91,348
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 371,111 368,545 368,735 369,496 369,210
4.19 632 P BARANDA METÁLICA ML ### 437,295 437,295 437,295 437,295 437,295
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,690 17,690 17,690 17,690 17,690
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 527,095 481,602 489,582 490,886 510,545
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 74,542 74,542 75,991 73,092 104,987
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 105,524 81,800 91,290 72,310 105,524
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 398,894 376,308 377,980 384,673 382,164
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 372,857 359,439 360,960 363,882 373,989

4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 381,500 368,082 369,603 372,525 382,632

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 387,124 374,110 375,601 378,404 388,555
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 395,767 382,753 384,244 387,047 397,198
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 535,191 513,284 514,906 521,398 518,963
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 630,206 607,432 609,118 615,868 613,336
4.31 681.1 GAVIÓN M3 ### 181,551 181,551 182,935 180,167 210,613
4.32 681.1 GAVIÓN MALLA PVC M3 ### 185,955 185,955 187,339 184,572 215,017
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### p 43,481 42,137 42,236 42,635 42,485
i
o
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500
4.34 672.1 PSI ML ### 16,963 16,290 16,340 16,539 16,465

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO


4.35 *** (RESISTENCIA ÚLTIMA 25 KN)
M2 ### 10,564 10,564 10,564 10,564 10,564

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 15,110 15,110 15,110 15,110 15,110

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 20,375 20,375 20,375 20,375 20,375
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN)
M2 ### 24,448 24,448 24,448 24,448 24,448
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 31,447 31,447 31,447 31,447 31,447

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,


4.40 *** FILTRO Y SEPARACIÓN) M2 ### 7,582 7,582 7,582 7,582 7,582

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,


4.41 *** FILTRO Y SEPARACIÓN) M2 ### 8,651 8,651 8,651 8,651 8,651

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN,


4.42 *** FILTRO Y SEPARACIÓN) M2 ### 8,994 8,994 8,994 8,994 8,994

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,


4.43 *** FILTRO Y SEPARACIÓN) M2 ### 6,384 6,384 6,384 6,384 6,384

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,


4.44 *** FILTRO Y SEPARACIÓN) M2 ### 9,657 9,657 9,657 9,657 9,657
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,
4.45 *** M2 ### p 7,860 7,860 7,860 7,860 7,860
FILTRO Y SEPARACIÓN)
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, o
4.46 *** FILTRO Y SEPARACIÓN) M2 ### 9,657 9,657 9,657 9,657 9,657

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN,


4.47 *** FILTRO Y SEPARACIÓN) M2 ### 18,629 18,629 18,629 18,629 18,629

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36"


4.48 661.1 CLASE I, INCLUYE EMBOQUILLADA
ML ### 662,426 662,143 662,164 662,248 662,217
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600
4.49 660.3 MM ML ### 381,124 376,287 376,645 378,079 377,541
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO
4.50 *** 36" ML ### 928,796 928,796 928,796 928,796 928,796

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 180,678 144,503 154,388 146,080 180,678
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,649 4,649 4,649 4,649 4,649
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4.53 *** INSTALACIÓN) ML ### 90,516 90,516 90,516 90,516 90,516
GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4.54 *** INSTALACIÓN) ML ### 137,963 137,963 137,963 137,963 137,963
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 546,867 524,093 525,779 532,528 529,997
4.56 682.1 P COLCHONETA RENO M3 ### 197,706 197,706 199,090 196,322 226,768
4.57 *** TRINCHO EN MADERA M2 ### 71,536 71,536 71,536 71,536 71,536

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,272 4,272 4,272 4,272 4,272
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,397 45,397 45,397 45,397 45,397
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 88,275 88,275 88,275 88,275 88,275
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 73,385 73,385 73,385 73,385 73,385
5.5 730.1 DEFENSA METÁLICA ML ### 155,915 154,756 154,842 155,185 155,056
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 14,242 14,242 14,242 14,242 14,242

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 851 851 851 851 851
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36",
6.2 801.6 INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN ### 131,984 131,984 131,984 131,984 131,984
DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE
6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 25,566 25,566 25,566 25,566 25,566
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí
i
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ###
p 8,310 8,310 8,310 8,310 8,310
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### i 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE o
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 16,155 16,155 16,155 16,155 16,155
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 26,253 26,253 26,253 26,253 26,253
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,800 9,800 9,800 9,800 9,800
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
CONSTRUCCIÓN

2,068,344 2,079,906
1,204,762 1,210,543
14,583 14,583
16,353 16,353
18,889 18,889
69,185 69,185
48,245 48,370
22,072 22,196
80,242 80,242
6,261 6,261
8,882 8,882
6,813 6,813
7,419 7,419
8,964 8,964
9,084 9,084
13,497 13,497
18,477 18,477
27,441 27,441
39,898 39,898
49,367 49,367
40,806 40,806
57,319 57,319
67,872 67,872
83,193 83,193
9,103 9,103
14,736 14,736
22,422 22,422
36,746 36,746
1,539 1,539
5,807 5,807
20,960 20,960
11,490 11,490
11,307 11,307
10,480 10,480
9,803 9,803
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
15,459 15,459
13,512 13,512
11,490 11,490
950,908 950,161
10,921 10,921
3,955 3,955
2,842,418 2,842,418
261,524 261,524
9,189 9,189

106,028 71,760
188,193 199,721
297,878 297,878
207,425 207,425
23,336 23,336
638,332 650,569
638,445 651,067
593,497 605,317
50,284 50,284
155,175 155,175

195,465 195,465

244,188 244,188

309,776 309,776
105,844 106,698
130,818 132,057
579,348 591,168
92,966 92,966

39,957 40,029
209,871 209,942
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
463,186 451,464
231,003 231,158
261,751 262,110
343,317 345,457
106,647 106,448
1,362,113 1,360,123
119,162 119,954
75,854 76,271
28,713 28,937
46,784 47,008
61,474 61,788
84,480 84,838
117,506 117,820
1,008,086 1,011,667

1,423,618 1,430,781

1,846,932 1,861,258

44,438 44,438
58,849 58,849
806,004 817,823
248,937 248,109
100,603 101,751

118,747 120,124
129,888 131,724
137,036 138,986
156,780 159,190
174,282 177,036
193,317 196,415
103,989 104,186
962,093 973,912
100,191 100,347
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
79,437 80,619
89,155 90,601
103,654 105,467
701,057 712,877
49,770 50,132
278,370 283,649
4,433 4,433
4,649 4,649
6,427 6,427
849,744 861,563
770,668 783,606
844,501 856,320
824,451 836,270
1,035,588 1,047,407
304,992 318,223

29,664 29,976
50,127 50,440
35,990 36,062
168,800 168,944
44,515 44,876
27,655 27,811
104,058 104,344
91,937 93,142
95,463 95,463
55,655 55,655
91,854 91,854
53,851 53,851
107,071 107,071
62,780 62,780
119,314 119,314
68,902 68,902
42,273 42,417
25,450 25,522
55,629 55,725
33,194 33,242
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
62,563 62,659
37,334 37,382
103,359 103,839
60,759 60,999
38,763 38,859
23,362 23,410
77,401 77,593
46,362 46,458
92,488 92,644
55,583 55,660
191,071 191,743
113,929 114,265
94,124 94,449
56,401 56,563
48,758 48,973
29,478 29,585
35,051 35,147
21,231 21,279
53,290 53,482
32,426 32,522
103,150 103,438
62,323 62,467
75,239 75,431
45,144 45,240
158,077 158,748
95,491 95,826
32,979 33,050
37,643 37,877
63,676 63,987
5,289 5,289
50,498 50,811
10,686 10,686
14,227 14,227
18,624 18,624
26,249 26,249
39,380 39,380
4,865 4,954
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí

16,381 16,381
5,736 5,808
6,922 6,994
8,266 8,337
7,147 7,147
14,002 14,002
24,352 24,579
14,770 14,883
21,280 21,481
12,924 13,025
20,461 20,688
12,514 12,628
21,280 21,481
12,924 13,025
21,981 22,143
13,273 13,354
17,696 17,849
10,843 10,920
17,071 17,244
10,531 10,618
22,058 22,260
13,293 13,394
21,239 21,466
12,883 12,997
17,682 17,855
10,818 10,905
22,128 22,355
13,732 13,846

27,065 27,353
85,734 86,337
58,438 58,438
23,095 23,095
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
36,337 36,337
85,553 85,553
66,876 66,876
38,669 38,669
89,689 89,689
107,200 107,200
157,796 157,796
61,930 61,930
85,827 85,827
77,931 77,931
139,282 139,282
81,474 81,474
59,736 59,736
33,585 33,585
61,019 61,377
49,811 49,811
45,636 45,636
38,179 38,179
37,410 37,410
37,696 37,696
53,322 53,322
46,816 46,816
86,040 86,040
159,326 159,326
71,455 71,455
44,028 44,028
34,622 34,622
60,909 60,909
20,661 20,661
24,967 24,967
27,136 27,136
35,085 35,085
23,025 23,025
54,281 54,281
378,516 378,516
422,485 422,485
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
285,616 285,616
305,735 305,735

446,277 458,662
388,599 400,074
385,535 397,415
337,308 349,358
312,407 324,832
280,998 293,844
235,572 245,453
457,468 467,062
418,453 429,272
484,712 494,830
725,332 735,450

129,504 129,504
4,021 4,093
144,485 144,485
177,424 177,424
259,756 259,756
289,229 289,229
318,734 318,734
211,940 211,940
240,356 240,356
354,018 354,018
133,798 133,798
177,842 177,842
197,733 197,733
504,620 504,620
44,103 44,103
27,214 27,214
104,225 104,225
128,922 128,922
100,080 100,080
30,803 30,803
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
30,803 30,803
29,183 29,183
44,543 44,543
55,306 55,306
66,786 66,786
80,419 80,419
380,535 380,535
265,737 265,737
35,216 35,216
45,261 45,261
55,306 55,306
69,656 69,656

79,862 79,862
224,162 224,162
84,243 84,243
149,707 149,707
143,103 143,103
93,930 93,930
221,941 221,941
115,279 115,279
6,897 6,897
103,002 103,002

127,347 127,347
42,443 42,443
572,404 572,404
205,185 205,185
229,025 229,025

521,150 521,150
133,357 133,357
417,804 417,804
6,309 6,309
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
293,014 293,014
127,199 127,199
90,613 90,613
93,353 93,353

10,961 10,961

12,193 12,193

9,635 9,635

229,687 229,687
278,169 278,169
23,095 23,095
36,337 36,337
34,733 34,733
44,651 44,651
92,397 92,397
231,136 231,136
44,362 44,362
616,334 616,334
1,268,924 1,268,924
36,375 36,375
68,717 68,717
102,835 102,835
87,255 87,255
63,045 63,045
67,203 67,203
84,952 84,952
68,858 68,858
86,607 86,607
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
92,758 92,758
77,399 77,399
13,067 13,067
18,484 18,484
24,116 24,116
14,842 14,842
8,830 8,830
53,934 53,934
34,429 34,429
11,082 11,082
26,514 26,514
36,852 36,852
50,056 50,056
94,038 94,038
113,780 113,780
63,356 63,356
80,861 80,861
195,901 195,901
404,891 404,891
298,782 298,782
18,437 18,437
23,286 23,286

181,230 181,230

295,820 295,820

492,889 492,889

42,627 42,627

50,301 50,301

64,195 64,195
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí

73,134 73,134

94,303 94,303

108,537 108,537

160,260 160,260
64,353 64,353
64,622 64,622
41,924 41,924
51,812 51,812
4,408 4,408
6,967 6,967
1,073,737 1,073,737
818,282 818,282
2,772,337 2,772,337
2,310,210 2,310,210
665,799 665,799
863,571 863,571
334,549 334,549

384,061 384,061
61,033 61,033
72,344 72,344
80,208 80,208
94,589 94,589
57,327 57,327
65,392 65,392
150,338 150,338
58,902 58,902
135,502 135,502
80,927 80,927
48,002 48,002
100,906 100,906
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
430,570 430,570
574,098 574,098
3,719 3,719
4,908 4,908
7,647 7,647
13,668 13,668
287,490 287,490
81,027 81,027
110,036 110,036
44,326 44,326
1,468,779 1,468,779
1,088,165 1,088,165
1,371,066 1,371,066
639,782 639,782
116,053 116,053
537,005 537,005
672,157 672,157
1,777,357 1,777,357
1,308,501 1,308,501

40,815 41,205
40,823 41,212
15,032 15,110
28,055 28,833
88,653 89,431
26,613 26,861
56,623 57,828
78,166 80,094
31,997 31,997
23,920 23,920
27,985 27,985
45,899 46,983
53,686 55,012
77,667 79,715
83,128 92,351
91,129 91,048
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí

59,868 60,024
35,608 35,685
68,003 68,392
71,553 71,942
76,072 76,461
79,417 79,573
37,562 37,731
172,526 173,227
46,772 47,188
45,405 45,405
10,112 10,281
9,988 9,988
13,430 13,430
11,029 11,029
18,637 18,637
36,539 36,539
9,471 9,471
78,209 78,209
123,262 123,807
7,694 7,694
32,959 33,102
48,646 48,646
56,648 56,648
51,487 51,487
51,819 51,975
58,316 58,472
11,321 11,321
51,704 51,919
21,816 21,816
130,999 130,999
10,281 10,281
23,752 23,752
15,111 15,111
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
14,670 14,670
8,799 8,799
8,960 8,960
20,068 20,068
18,257 18,257
20,033 20,033
23,159 23,159
68,856 69,012
82,689 82,689
34,860 34,860
13,936 13,936
109,001 109,001
131,586 131,586

77,639 77,639
37,106 37,106
58,197 58,197
71,682 71,682
53,396 53,396
99,510 99,510
52,184 52,184
110,250 110,250
13,900 13,900

5,627 5,627
18,479 18,479
25,905 25,905
43,707 43,707

49,987 49,987
85,005 85,005
19,114 19,114
90,542 56,274
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
89,671 99,697
181,363 147,095
95,934 61,666
162,276 137,084
178,333 144,065

321,413 321,413

951,548 951,548

514,698 514,698
147,391 147,391
207,609 207,609

192,648 192,648
426,752 426,752
1,094,678 1,094,678
309,396 309,396
218,288 218,288
85,624 85,624
265,068 265,068

391,517 391,517

8,660 8,660
3,229 3,229
11,440 11,440
44,083 44,083
6,003 6,003
70,071 70,071
3,556 3,556
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
2,889 2,889
14,432 14,432
4,194 4,194
15,224 15,224
6,045 6,045
6,859 6,859
7,192 7,192
4,491 4,491
16,037 16,037
9,897 9,897
23,340 23,340
2,769 2,769
12,781 12,781
3,442 3,442
13,059 13,059
7,328 7,328
4,584 4,584
22,841 22,841
13,062 13,062
8,040 8,040

6,493,703 6,493,703
11,473,306 11,473,306
3,002,321 3,002,321
9,812,391 9,812,391
9,190,384 9,190,384
2,769 2,769
920,032 920,032
92,129 92,129
1,666,839 1,666,963
707,993 710,963

30,723 30,723
45,927 45,927
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
57,035 57,035
18,378 18,378
22,333 22,333
30,540 30,540
26,928 26,928
28,408 28,408
35,618 35,618
18,683 18,683
24,535 24,535
37,838 37,838
291,041 291,041
335,103 335,103
349,296 349,296
323,341 323,341

236,118 236,118
36,328 36,328
109,786 109,786
275,309 275,309
54,647 54,647
608,535 608,535
1,516,564 1,516,564
45,546 45,546
236,629 236,629
45,898 45,898
3,976 3,976
6,733 6,733
19,160 19,160
25,175 25,175
32,764 32,764
130,559 130,559
34,043 34,043
111,711 111,711
191,538 191,538
303,779 303,779
376,104 376,104
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
411,624 411,624
598,908 598,908
351,676 351,676
110,615 110,615
14,794 14,794
30,280 30,280
5,252 5,252
36,815 36,815
38,509 38,509
39,354 39,354
25,656 25,656
28,440 28,440
29,611 29,611
50,177 50,177
651,869 651,869
333,682 333,682
92,217 92,217
1,922 1,922
8,891 8,891
13,338 13,338
22,324 22,324
4,109 4,109
22,866 22,866
33,469 33,469
20,103 20,103
16,150 16,150
660,708 660,708
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
URBANISMO

9,712 9,712
96,641 96,641
545,500 545,500
1,164,403 1,164,403
133,301 133,301
813,379 813,379
1,751,240 1,751,240
13,705 13,705
16,969 16,969
21,377 21,377
23,423 23,423
28,136 28,136
28,136 28,136
114,013 114,013
132,026 132,026
408,742 408,742
153,539 153,539
253,104 253,104
1,120,834 1,120,834
1,291,469 1,291,469
14,958 14,958
13,175 13,175
33,006 33,006
130,384 130,384
194,487 194,487
31,627 31,627
109,198 109,198
162,136 162,136
32,034 32,034
66,130 66,130
267,020 267,020
77,212 77,212
310,779 310,779
185,526 185,526
530,304 530,304
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
1,423,266 1,423,266
2,103,162 2,103,162

11,064 11,064
25,229 25,229
19,114 19,114
79,263 90,036
85,507 51,239
100,994 66,726
80,087 59,590
81,497 60,602
79,857 89,165

121,892 121,892
1,272,768 1,272,768
159,358 159,358
1,474,234 1,474,234
1,027,374 1,027,374
63,484 63,484
120,999 120,999
285,932 285,932
285,925 285,925
459,146 459,146
121,050 121,050
121,050 121,050
285,932 285,932
285,932 285,932
459,146 459,146
459,399 459,399
747,190 747,190
1,199,653 1,199,653
74,089 74,089
384,098 384,098
432,187 432,187
1,195,489 1,195,489
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
69,610 69,706
348,013 348,013
53,065 53,065
75,129 75,129
108,504 108,504
166,598 166,598
267,915 267,915
387,866 387,866
491,100 491,100
645,818 645,818
888,958 888,958

679,464 686,592

669,873 674,831

734,406 739,158

807,029 815,939

954,681 961,663

845,699 852,233
1,011,111 1,014,537
1,457,005 1,466,988
2,001,392 2,020,220
2,633,856 2,665,153
1,936,658 1,936,658
4,106,486 4,106,486
142,715 142,917

75,626 76,127
89,978 90,479
54,634 55,899
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
59,698 60,945
60,020 61,224
268,450 268,653
18,351 18,503
39,062 39,954
87,228 87,336
573,193 576,141
64,253 64,716
94,503 94,966
33,167 33,666
53,013 54,023
107,328 103,456
62,318 62,599

211,919 212,513
702,291 703,123
225,443 225,567
167,612 168,325
169,480 170,192
199,482 200,228
59,997 60,381
70,597 71,027
329,550 329,646
868,022 868,379
3,575,984 3,576,222
3,678,825 3,679,063
513,189 513,438
677,951 678,945
564,968 564,968
258,981 259,337
608,353 608,593
6,794,400 6,796,182

4,272 4,272
45,397 45,397
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
330,614 330,715
518,783 519,280
245,261 245,362
260,691 260,792
272,375 272,476
14,242 14,242
15,219 15,219
124,389 124,389
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
PECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777

53,673 53,673

2,613,971 2,613,971

933,801 933,801

89,524 89,524

1,318 1,318

9,548 9,548
36,055 36,055
8,749 8,749
14,967 14,967
13,068 13,068
7,499 7,499
481 481
12,832 12,832

20,948 20,948

65,891 65,891

80,664 80,664

19,035 19,035

39,738 39,738

31,203 31,203
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí

53,644 53,644

5,366 5,366
162,276 137,084
178,333 144,065
139,125 139,125
3,382 3,382
1,157 1,157
229,757 232,594
67,772 68,480
671,117 651,347
697,892 678,122
735,769 715,999
705,329 685,559
275,221 288,987
335,332 301,064
317,832 292,639
40,236 40,236
179,848 179,848
95,934 61,666
11,877 12,082
4,775 4,877
629,422 640,636

661,963 673,679

683,558 695,597

7,218 7,218
119,501 90,505

900,647 913,367
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
773,775 786,284
819,193 832,197
556,489 568,079
652,110 664,159
553,394 565,393
648,893 661,367
712,425 724,424
571,914 584,388
755,414 767,888
12,175 12,175

15,716 15,716
1,845 1,845
2,791,003 2,791,003

4,135,946 4,157,705

1,714,701 1,726,581
91,348 91,348
366,834 368,260
437,295 437,295
17,690 17,690
479,316 470,640
103,538 74,542
89,708 58,076
361,249 373,799
361,038 357,949

369,681 366,592

375,978 372,664
384,621 381,307
498,679 510,850
592,249 604,901
209,229 181,551
213,633 185,955
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí

41,240 41,987

15,842 16,215

10,564 10,564

15,110 15,110

20,375 20,375

24,448 24,448

31,447 31,447

7,582 7,582

8,651 8,651

8,994 8,994

6,384 6,384

9,657 9,657
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí

7,860 7,860

9,657 9,657

18,629 18,629

661,955 662,112

373,062 375,750

928,796 928,796

164,203 131,253
4,649 4,649
90,516 90,516

137,963 137,963
508,910 521,562
225,384 197,706
71,536 71,536

4,272 4,272
45,397 45,397
88,275 88,275
73,385 73,385
153,983 154,627
14,242 14,242

851 851

131,984 131,984

25,566 25,566
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: MAGDALENA CENTRO
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Juan_de_Rioseco Vianí
8,310 8,310
448,890 448,890
1,804 1,804
16,155 16,155
26,253 26,253
9,800 9,800
APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
CONSTRUCCIÓN p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,970,650
1.2 CAMPAMENTO 9 M2 UN ### 1,152,377
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,189
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,907
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,394
1.6 CERCA EN TABLA H=2.30 M ML ### 66,040
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 45,993
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,094
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 910,145
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,468
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,776
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,702,927
1.44 RED TELEFÓNICA PROVISIONAL UN ### 250,021
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 183,592
2.2 BASE ARENA CEMENTO 1:20 M3 ### 165,405
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,280
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 601,366
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 602,999
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 561,356
2.9 PILOTE DE MADERA D=20 CM ML ### 49,757
2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 153,462
2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 191,648
2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 237,826
2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 299,989
2.14 PILOTE HINCADO 25X25 ML ### 102,427
2.15 PILOTE HINCADO 30X30 ML ### 125,866
2.16 DADOS EN CONCRETO 3500PSI M3 ### 547,207
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 91,839

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 38,352
3.2 SIFÓN EN PVC 6" UN ### 199,210
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 486,892
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 224,440
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 254,593
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ###
i 328,879
p
3.7 DUCTO ELÉCTRICO PVC 4" ML ### i 105,477
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### o 1,297,911
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 113,766
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 72,063
3.11 TUBERÍA DRENAJE PVC 110 ML ### 27,149
3.12 TUBERÍA DRENAJE PVC 160 ML ### 44,277
3.13 TUBERÍA DRENAJE PVC 200 ML ### 58,031
3.14 TUBERÍA DRENAJE PVC 250 ML ### 79,708
3.15 TUBERÍA DRENAJE PVC 315 ML ### 111,006
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 949,614
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,334,282
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,718,420

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,489
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 56,101
4.3 COLUMNAS 3500 PSI M3 ### 768,275
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 235,320
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.5 PSI M2 ### 95,022
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.6 PSI
M2 ### 111,986
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 123,759
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 130,531
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 148,950
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 165,413
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 183,432
4.12 ENTREPISO VIGUETA PLACA M2 ### 99,391
4.13 ESCALERA MACIZA 3500 PSI M3 ### 917,187
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 95,617
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 75,562
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 84,584
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 98,114
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 667,147
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,343
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 264,032
4.21 ACERO FIGURADO 37000 PSI KG ### 4,219
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
4.22 ACERO FIGURADO 60000 PSI KG ###
i 4,425
p
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### i 6,200
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### o 814,357
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 734,573
4.26 VIGA AÉREA 3500 PSI M3 ### 808,401
4.27 VIGA CINTA 3500 PSI M3 ### 788,325
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 998,895
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 274,427

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 28,789
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,180
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,025
5.4 ARCOS EN LADRILLO PRENSADO ML ### 164,455
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,128
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,997
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 99,152
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 87,422
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 92,071
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,959
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 88,663
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,255
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 102,849
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,670
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 114,417
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,454
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 40,619
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,623
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 53,217
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 31,988
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,899
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,002
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 98,625
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,392
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,330
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,646
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 74,293
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ###
i 44,807
p
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### i 88,516
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### o 53,597
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 181,787
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 109,287
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 89,588
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,133
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 46,683
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,440
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,788
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,600
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 50,955
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,259
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 98,548
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,022
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 71,976
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,478
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 150,600
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 91,703
5.47 REMATES LADRILLO PRENSADO ML ### 31,807
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 35,931
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 60,956
5.50 LAVADA DE FACHADA M2 ### 5,254
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,543
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,618
5.53 ANCLAJE 3/8" L=30CM UN ### 14,015
5.54 ANCLAJE 1/2" L=50CM UN ### 18,311
5.55 ANCLAJE 5/8" L=70CM UN ### 25,610
5.56 ANCLAJE 3/4" L=70CM UN ### 38,156
5.57 ANCLAJE 1" L= 70CM UN ### 4,631

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,186
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,564
6.3 FILOS O DILATACIONES S/MURO ML ### 6,750
6.4 GOTERA EN MORTERO 1:4 ML ### 8,037
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,881
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
6.6 MALLA BAJO ENTRAMADO M2 ###
i 13,744
p
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### i 23,613
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### o 14,400
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 20,619
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,593
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 19,722
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,145
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 20,619
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,593
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 21,164
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 12,865
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,192
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,591
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,508
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,250
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 21,397
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 12,962
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 20,500
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,514
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,119
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,537
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 21,389
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,363

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 26,120
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### 81,670
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,780
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,273
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,959
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 81,465
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,823
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,177
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 85,373
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 101,917
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 149,715
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 59,243
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
7.13 CANAL PVC AMAZONAS ML ###
i 82,374
p
7.14 CANAL PVC RAINGO ML ### i 74,913
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### o 132,726
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 77,484
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 56,949
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,554
7.19 TEJA DE BARRO M2 ### 58,689
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 47,470
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,526
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,805
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 36,030
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 36,300
7.25 TEJA TERMOACÚSTICA M2 ### 51,018
7.26 TEJA PLÁSTICA No.6 M2 ### 44,872
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 82,018
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 151,317
7.29 TEJA SIN TRASLAPO M2 ### 68,073
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,883
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,568
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 58,401
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,171
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,239
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,242
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,751
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,315
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,519
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 358,258
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 411,875
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 272,707
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 291,229

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 414,120
8.2 CONCRETO 3500 PSI M3 ### 358,323
8.3 CONCRETO 3000 PSI M3 ### 354,122
8.4 CONCRETO 2500 PSI M3 ### 311,477
8.5 CONCRETO 2000 PSI M3 ### 285,000
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
8.6 CONCRETO 1500 PSI M3 ###
i 251,323
p
8.7 MORTERO SECO 1:10 M3 ### i 212,985
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### o 425,982
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 383,277
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 446,951
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 674,271

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 124,112
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,796
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 138,973
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 170,090
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 246,865
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 274,744
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 302,655
9.8 HOJA PUERTA FORTEC 0.81 UN ### 200,939
9.9 HOJA PUERTA FORTEC 0.91 UN ### 227,783
9.10 HOJA PUERTA FORTEC 1.50 UN ### 335,158
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 127,118
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 168,726
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 187,517
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 477,431
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,438
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,483
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 100,338
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 122,167
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 94,920
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,475
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,475
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,945
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,758
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,925
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,770
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 76,648
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 360,693
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 252,244
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,946
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
9.30 VIDRIO TRANSPARENTE 4 MM M2 ###
i 43,435
p
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### i 52,925
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### o 66,482

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 76,684
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 213,003
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 81,238
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 145,560
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 137,664
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 90,388
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 212,928
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 110,970
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,661
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 100,406
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 121,915
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,336
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 542,998
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 195,386
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 219,458
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 495,219
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 129,521
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 395,935
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,084
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 278,579
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 123,264
10.21 REJILLA PISO 0.30 M M2 ### 86,905
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 89,739
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,664
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,
10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,828
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,412
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO
i
p
11.1 ACOMETIDA EN PVC 1/2" 5M UN ### i 222,947
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### o 268,753
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,273
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 34,959
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,557
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 43,004
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 88,612
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 224,316
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,295
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924
11.12 LLAVE MANGUERA UN ### 35,357
11.13 NIPLE PASAMURO 2" UN ### 67,302
11.14 NIPLE PASAMURO 4" UN ### 100,557
11.15 PUNTO AGUA CALIENTE CPVC UN ### 84,813
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 61,942
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 65,872
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 83,236
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 67,036
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 83,805
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 89,617
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 74,201
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,583
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,700
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,114
11.26 RED SUMINISTRO PVC 1" ML ### 14,286
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,540
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 51,449
11.29 RED SUMINISTRO PVC 2" ML ### 32,923
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,691
11.31 RED SANITARIA PVC-S 2" ML ### 25,445
11.32 RED SANITARIA PVC-S 3" ML ### 35,291
11.33 RED SANITARIA PVC-S 4" ML ### 47,885
11.34 RED SANITARIA PVC-S 6" ML ### 89,433
11.35 REGISTRO 1" UN ### 108,680
11.36 REGISTRO 1/2" UN ### 60,598
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
11.37 REGISTRO 3/4" UN ###
i 77,134
p
11.38 REGISTRO 1 1/2" UN ### i 186,259
11.39 REGISTRO 2 1/2" UN ### o 383,988
11.40 REGISTRO 2" UN ### 283,748
11.41 REVENTILACIÓN 2" ML ### 17,748
11.42 REVENTILACIÓN 3" ML ### 22,396
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 174,189
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 283,436
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 471,593
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 40,783
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 48,085
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 61,745
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 69,971
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 90,160
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 104,489
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 154,567
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,307
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,561
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 40,311
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 49,653
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,204
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,623
11.59 GABINETE TIPO III UN ### 1,023,602
11.60 GABINETE TIPO I UN ### 782,276
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,626,606
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,190,039
11.63 VÁLVULA MARIPOSA 3" UN ### 636,630
11.64 VÁLVULA MARIPOSA 4" UN ### 823,463
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 316,683

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 366,502
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 58,230
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 68,919
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 76,533
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 90,123
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,751
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
12.7 SALIDA TIMBRE PVC COMPLETA UN ###
i 62,398
p
12.8 STRIP TELEFÓNICO 10 PARES UN ### i 144,171
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### o 56,217
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 129,176
12.11 SALIDA T.V PVC COMPLETA. UN ### 77,267
12.12 SALIDA BIFÁSICA C.N. UN ### 45,815
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 96,615
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 412,580
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 549,443
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,557
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,697
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,307
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,072
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 274,619
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 77,630
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 105,035
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,959
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,408,618
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,043,963
12.26 POSTE METÁLICO 6M UN ### 1,303,801
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 606,385
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 110,828
12.29 LUMINARIA 70W SODIO UN ### 508,727
12.30 LUMINARIA 150W SODIO UN ### 636,405
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,680,545
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,237,621

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 38,838
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 38,527
13.3 ALISTADO PARA LISTÓN M2 ### 14,594
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 25,783
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 83,284
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 25,971
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 53,910
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 73,831
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,697
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
13.10 PEGANTE MORTERO-CONCRETO M2 ###
i 23,243
p
13.11 PERMA PLY 2 CAPAS M2 ### i 27,289
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### o 43,509
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 50,780
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 73,145
13.15 TRITURADO FINO 1/2 M3 ### 59,433
13.16 TRITURADO GRUESO 3/4 M3 ### 93,830

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,407
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,375
14.3 ADOQUÍN CONCRETO 6CM M2 ### 64,934
14.4 ADOQUÍN CONCRETO 8CM M2 ### 68,284
14.5 ADOQUÍN GRES PEATONAL M2 ### 72,603
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 75,810
14.7 GRAVILLA PARA GRADAS ML ### 37,000
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 163,804
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 45,403
14.10 GUARDAESCOBA EN GRANITO ML ### 44,442
14.11 GUARDAESCOBA EN GRAVILLA ML ### 9,660
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,507
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,758
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,677
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,864
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,777
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,361
14.18 LISTÓN M.H. AMARILLO M2 ### 75,432
14.19 PASO ESCALERA GRANITO ML ### 118,446
14.20 PIRLANES ALUMINIO ML ### 7,658
14.21 PIRLANES LADRILLO ML ### 32,058
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 46,524
14.23 PISO VINILO TRÁFICO PESADO M2 ### 54,054
14.24 PULIDA LACADA PISO MADERA M2 ### 49,887
14.25 TABLETA DE GRES 25X25 M2 ### 49,738
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 55,875
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,108
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 49,624
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
14.29 JABONERA PORCELANA ACUARIO UN ###
i 20,904
p
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### i 125,045
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### o 10,098
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,825
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,663
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,247
14.35 REMATES BOCEL ALUMINIO ML ### 8,681
14.36 REMATES BOCEL PORCELANA ML ### 8,833
14.37 TAPA REGISTRO 20X20 UN ### 19,346
14.38 TAPA REGISTRO 6X6 UN ### 17,635
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,925
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 21,878
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 65,661
14.42 MEDIA CAÑA EN GRANITO ML ### 78,529
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,653
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,465
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 103,103
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 124,842

15 CIELO RASO
15.1 APLIQUE YESO ML ### 73,788
15.2 ARMADURA MADERA Y MALLA M2 ### 36,474
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 56,238
15.4 CIELO RASO DURACUSTIC M2 ### 68,977
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,496
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 95,421
15.7 CORNISAS YESO ML ### 49,520
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 105,443
15.9 MALLA CON VENA M2 ### 13,648

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16.2 MENOR DE 5 KM)
M3 ### 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 49,987
i
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### o 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 183,592
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 59,771
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 194,492
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 173,498
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 178,500
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 191,461

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 306,023
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 901,570
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 488,617
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 141,890
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 198,513
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 184,379
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 405,535
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,036,784
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 294,670
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 208,866
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 83,275
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA) UN ### 252,794
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17.13 ACCESORIOS Y GRIFERÍA) UN ### 372,249

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,438
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,126
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,247
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,724
18.5 CARBURO SOBRE PAÑETES M2 ### 5,895
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 66,492
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,507
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,806
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ###
i 14,090
p
18.10 ESMALTE SOBRE MADERA LINEAL ML ### i 4,081
18.11 ESMALTE SOBRE MADERA LLENA M2 ### o 14,857
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,810
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,612
18.14 ESTUCO M2 ### 7,091
18.15 ESTUCO (LINEAL) ML ### 4,441
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,684
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,721
18.18 LACA PISOS MADERA M2 ### 22,997
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,715
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,312
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,322
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,732
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,160
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,500
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,052
18.26 PINTURA EPÓXICA M2 ### 12,815
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,917

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,138,202
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR
19.2 (PAR) UN ### 10,845,253
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,838,243
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,275,501
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,686,118
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,715
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 871,183
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 87,033
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,575,947
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 672,591

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,658
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,087
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 54,666
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ###
i 17,802
p
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### i 21,571
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### o 29,417
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,312
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,740
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,694
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,839
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,384
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,972
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 275,810
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 317,435
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 331,064
20.16 ACOMETIDA GAS 1/2" ML ### 307,092

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 224,187
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 34,364
21.3 SIRENA DE 110 V UN ### 104,655
21.4 CÁMARA CCTV UN ### 265,722
21.5 PARLANTE-CIELO FALSO UN ### 52,564
21.6 AMPLIFICADOR 100W UN ### 579,578
21.7 AMPLIFICADOR 300W UN ### 1,437,197
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,196
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 224,247
21.10 TOMA PARA MICRÓFONO UN ### 44,437
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,803
21.12 SPLITERS UN ### 6,389
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,805
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,644
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 31,997
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 124,168
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,396
21.18 BANDEJA PORTACABLES PARA RACK UN ### 105,935
21.19 RACK 2' X 24" UN ### 185,644
21.20 RACK 3' X 24" UN ### 291,678
21.21 RACK 5' X 24" UN ### 362,353
21.22 RACK 7' X 24" UN ### 395,908
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ###
i 579,884
p
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### i 341,625
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### o 105,232
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,016
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,646
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,055
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,620
21.30 CANALETA METÁLICA 4X10 CMS ML ### 37,219
21.31 CANALETA METÁLICA 6X10 CMS ML ### 38,019
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,801
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,432
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,537
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 47,966
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 620,515
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 318,752
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 89,467
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,856
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,568
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,777
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,324
21.43 CABLE TELEVISIÓN RG6 ML ### 3,952
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,541
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,792
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,554
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,539
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 626,180
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
URBANISMO p
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 91,669
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 516,075
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,101,492
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 126,302
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 769,138
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,655,127
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,245
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,328
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,493
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,425
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,877
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,877
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 107,931
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 125,022
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 386,881
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 145,271
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 239,478
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,059,588
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,220,786
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,355
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,670
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,210
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 123,919
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 184,476
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,176
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 103,904
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 153,914
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,487
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 62,845
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 252,997
1.32 UNIÓN REPARACION PVC 4" UN ### 73,314
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 294,336
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 176,607
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 502,300
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ###
i 1,344,964
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 1,987,316
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,840
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,776
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 46,620
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 178,557
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 178,557
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 117,870
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 101,628
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 65,494

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 115,375
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,202,671
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 150,767
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,392,994
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 970,924
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,730
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 114,531
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 270,417
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 270,411
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 434,126
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 114,580
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 114,580
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 270,417
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 270,417
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 434,126
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 436,240
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 708,115
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,136,408
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 70,226
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 365,104
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 409,031
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,132,283
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 65,932
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 331,015
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 50,347
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 71,194
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 102,726
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 157,682
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 253,396
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 367,870
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 465,470
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 611,995
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 841,688

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 645,855
4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 635,245
4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 698,615
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 765,348
4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 902,211
4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 802,621
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 984,157
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,409,044
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,912,297
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,516,785
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,842,456
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,896,870
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y
4.13 DEMOLICIÓN) UN ### 138,454

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 71,993
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 85,513
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 51,719
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 56,197
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 56,638
5.6 BORDE SEPARADOR VERDE A-170 ML ### 254,029
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 17,931
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ###
i 37,056
p
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### i 83,316
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### o 547,003
5.11 LOSETA PREFABRICADA A-40 M2 ### 61,075
5.12 LOSETA PREFABRICADA A-60 M2 ### 89,356
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 31,624
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 50,120
5.15 SARDINEL PREFABRICADO A-10 ML ### 102,844
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 59,407

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 201,414
6.2 BANCA EN CONCRETO M-30 UN ### 665,453
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 214,939
6.4 BOLARDO M-60 CONCRETO UN ### 159,802
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 161,670
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 189,908
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 57,722
6.8 BORDILLO PREFABRICADO A-80 ML ### 66,806
6.9 CANECA M-120 UN ### 312,372
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 823,326
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,382,510
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,479,664
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 485,750
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 641,119
6.15 BANCA EN MADERA M-50 UN ### 535,530
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 247,099
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 575,662
6.18 POSTE HISTÓRICO M-131 UN ### 6,425,071

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,043
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,426
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 313,708
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 493,076
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 234,772
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 249,348
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ###
i 260,386
p
7.8 TACHAS REFLECTIVAS UN ### i 13,573
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### o 14,494

7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 117,926
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS p 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM) M3 ### 152,777
1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.3 200.1 5KM) HA ### 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.4 200.2 DISTANCIA DE 5KM)
HA ### 933,801
1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y
1.6 *** DERRUMBES M3-KM### 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,361
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.9 600.1 KM) M3 ### 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.10 600.2 KM) M3 ### 65,019
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.11 600.3 DE 5 KM) M3 ### 79,792
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 600.4 MENOR DE 5 KM) M3 ### 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 600.4 P DISTANCIA MENOR DE 5 KM) M3 ### 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.14 600.5 DISTANCIA MENOR DE 5 KM) M3 ### 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A
2.15 600.5 P UNA DISTANCIA MENOR DE 5 KM)
M3 ### 53,644

3 NORMA INV ESTRUCTURA DE PAVIMENTO


GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ###
i 5,366
p
3.2 320.1 SUBBASE GRANULAR M3 ### i 178,500
3.3 330.1 BASE GRANULAR M3 ### o 191,461
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON
3.4 365.1 CARGUE MENOR A 5 Km) M3 ### 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,221
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,120
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 214,768
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 63,758
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 649,172
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 662,559
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 699,241
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 794,947
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 452,682
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 339,315
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 325,233
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 38,454
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 170,675
3.15 311.1 AFIRMADO M3 ### 173,498
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 10,927
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,322
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.18 500.1 UNIÓN
M3 ### 596,959
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.19 500.1 UNIÓN M3 ### 627,300
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.20 500.1 UNIÓN
M3 ### 647,701
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E
3.21 *** INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,047
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 152,671

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 866,298
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 740,964
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 785,428
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 525,578
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 619,988
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 521,335
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ###
i 615,577
p
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### i 680,366
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### o 538,930
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 722,430
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 11,890
4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG ### 15,250
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,792
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4.14 621.1 REFUERZO Y ANILLOS) ML ### 2,688,461
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN
4.15 621.1 P CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
ML ### 4,039,587
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,673,710
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 87,157
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 354,380
4.19 632 P BARANDA METÁLICA ML ### 422,791
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,928
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 500,430
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 155,969
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 175,537
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 333,568
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 356,655
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 365,298
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 372,541
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 381,184
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 472,590
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 565,126
4.31 681.1 GAVIÓN M3 ### 237,746
4.32 681.1 GAVIÓN MALLA PVC M3 ### 241,907
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 39,543
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 14,946
4.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 ### 10,111
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,407

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,381


4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 ### 23,227
4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 ### 29,840
4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,256
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### p 8,266
i
o
4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,592

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,125

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,218

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,519

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,218

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 17,693

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE


4.48 661.1 EMBOQUILLADA
ML ### 629,577
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 351,016
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 881,526
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 238,693
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,425
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 85,809
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 130,730
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 479,837
4.56 682.1 P COLCHONETA RENO M3 ### 253,657
4.57 *** TRINCHO EN MADERA M2 ### 67,900

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,043
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,426
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 83,702
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 69,635
5.5 730.1 DEFENSA METÁLICA ML ### 145,874
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,573

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 839
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina
i
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE
6.2 801.6 DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
UN ### p 131,984
i
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES
6.3 801.7 ML ### o 25,566
A UNA DISTANCIA DE 5 KM
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,310
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5
6.6 801.4 KM) M2 ### 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,456
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,996
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,497

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN
DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
CONSTRUCCIÓN

2,019,431
1,176,767
14,189
15,907
18,394
66,040
46,547
21,647
80,242
6,261
8,882
6,813
7,419
8,964
9,084
13,497
18,477
27,441
39,898
49,367
40,806
57,319
67,872
83,193
9,103
14,736
22,422
36,746
233,157
1,539
5,807
20,960
11,490
11,307
10,480
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
9,803
15,459
13,512
11,490
914,685
10,468
3,776
2,702,927
250,021
9,189

166,458
215,017
297,878
207,425
22,280
655,004
659,629
614,383
49,757
153,462
191,648
237,826
299,989
106,388
131,607
600,234
91,839

38,660
199,518
496,610
229,323
262,804
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
343,593
105,378
1,296,916
117,171
73,859
27,919
45,048
59,110
80,940
112,085
961,940
1,358,934
1,767,724

42,489
56,101
821,301
261,552
100,170

118,164
131,996
139,283
159,762
177,769
197,332
100,219
970,214
96,553
80,865
91,071
106,248
720,174
50,019
287,714
4,219
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
4,425
6,200
867,384
792,581
861,428
841,351
1,051,922
330,254

30,214
50,605
35,334
165,071
44,804
27,932
100,385
93,009
92,071
53,959
88,663
52,255
102,849
60,670
114,417
66,454
41,239
24,933
53,630
32,194
60,312
36,209
100,690
59,424
37,742
22,852
75,118
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
45,220
89,452
54,064
184,677
110,733
90,873
54,775
47,607
28,902
34,201
20,806
51,781
31,672
99,786
60,641
72,802
43,890
153,490
93,148
32,116
36,855
62,189
5,254
50,968
10,618
14,015
18,311
25,610
38,156
5,020

16,186
5,872
7,058
8,345
6,881
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
13,744
24,512
14,850
21,486
13,027
20,621
12,595
21,486
13,027
21,805
13,185
17,852
10,922
17,194
10,592
22,264
13,396
21,400
12,964
17,804
10,880
22,289
13,813

27,359
84,463
55,780
22,273
34,959
81,465
63,823
37,177
85,373
101,917
149,715
59,243
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
82,374
74,913
132,726
77,484
56,949
32,554
60,230
47,470
43,526
36,805
36,030
36,300
51,018
44,872
82,018
151,317
68,073
42,883
33,568
58,401
20,171
24,239
26,242
33,751
22,315
52,519
358,258
411,875
272,707
291,229

471,534
409,805
406,198
367,339
340,350
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
305,524
255,509
467,275
426,110
487,011
714,331

124,112
4,105
138,973
170,090
246,865
274,744
302,655
200,939
227,783
335,158
127,118
168,726
187,517
477,431
42,438
26,483
100,338
122,167
94,920
29,475
29,475
27,945
42,758
52,925
63,770
76,648
360,693
252,244
33,946
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
43,435
52,925
66,482

76,684
213,003
81,238
145,560
137,664
90,388
212,928
110,970
6,661
100,406
121,915
41,336
542,998
195,386
219,458
495,219
129,521
395,935
6,084
278,579
123,264
86,905
89,739

10,664

11,828

9,412
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno

222,947
268,753
22,273
34,959
33,557
43,004
88,612
224,316
44,295
616,334
1,268,924
35,357
67,302
100,557
84,813
61,942
65,872
83,236
67,036
83,805
89,617
74,201
12,583
17,700
23,114
14,286
8,540
51,449
32,923
10,691
25,445
35,291
47,885
89,433
108,680
60,598
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
77,134
186,259
383,988
283,748
17,748
22,396
174,189
283,436
471,593
40,783
48,085
61,745
69,971
90,160
104,489
154,567
62,307
62,561
40,311
49,653
4,204
6,623
1,023,602
782,276
2,626,606
2,190,039
636,630
823,463
316,683

366,502
58,230
68,919
76,533
90,123
54,751
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
62,398
144,171
56,217
129,176
77,267
45,815
96,615
412,580
549,443
3,557
4,697
7,307
13,072
274,619
77,630
105,035
42,959
1,408,618
1,043,963
1,303,801
606,385
110,828
508,727
636,405
1,680,545
1,237,621

40,379
40,067
14,902
28,864
86,365
27,078
59,496
82,768
30,697
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
23,243
27,289
48,536
56,924
82,642
91,172
116,967

58,023
34,683
66,475
69,825
74,144
76,427
37,591
166,577
46,892
44,442
10,250
9,507
12,758
10,677
17,864
34,777
9,361
75,432
120,603
7,658
32,674
46,524
54,054
49,887
50,354
56,492
11,108
50,548
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
20,904
125,045
10,098
22,825
14,663
14,247
8,681
8,833
19,346
17,635
18,925
21,878
66,277
78,529
34,653
13,465
103,103
124,842

73,788
36,474
56,238
68,977
51,496
95,421
49,520
105,443
13,648

5,627
18,479
25,905
43,707
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno

49,987
85,005
19,114
166,458
90,796
177,358
156,364
167,915
174,327

306,023
901,570
488,617
141,890
198,513
184,379
405,535
1,036,784
294,670
208,866
83,275
252,794

372,249

8,438
3,126
11,247
42,724
5,895
66,492
3,507
2,806
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
14,090
4,081
14,857
5,810
6,612
7,091
4,441
15,684
9,721
22,997
2,715
12,312
3,322
12,732
7,160
4,500
22,052
12,815
7,917

6,138,202
10,845,253
2,838,243
9,275,501
8,686,118
2,715
871,183
87,033
1,576,521
685,610

29,658
44,087
54,666
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
17,802
21,571
29,417
26,312
27,740
34,694
17,839
23,384
35,972
275,810
317,435
331,064
307,092

224,187
34,364
104,655
265,722
52,564
579,578
1,437,197
45,196
224,247
44,437
3,803
6,389
18,805
24,644
31,997
124,168
32,396
105,935
185,644
291,678
362,353
395,908
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
579,884
341,625
105,232
14,016
28,646
5,055
35,620
37,219
38,019
24,801
27,432
28,537
47,966
620,515
318,752
89,467
1,856
8,568
12,777
21,324
3,952
22,541
32,792
19,554
15,539
626,180
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
URBANISMO

9,712
91,669
516,075
1,101,492
126,302
769,138
1,655,127
13,245
16,328
20,493
22,425
26,877
26,877
107,931
125,022
386,881
145,271
239,478
1,059,588
1,220,786
14,355
12,670
31,210
123,919
184,476
30,176
103,904
153,914
30,487
62,845
252,997
73,314
294,336
176,607
502,300
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
1,344,964
1,987,316

10,840
24,776
19,114
79,524
161,423
161,423
135,467
91,939
105,553

115,375
1,202,671
150,767
1,392,994
970,924
62,730
114,531
270,417
270,411
434,126
114,580
114,580
270,417
270,417
434,126
436,240
708,115
1,136,408
70,226
365,104
409,031
1,132,283
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
66,345
331,015
50,347
71,194
102,726
157,682
253,396
367,870
465,470
611,995
841,688

677,100
654,874
719,446
804,405
929,852
831,263
998,849
1,452,575
1,996,716
2,657,113
1,842,456
3,896,870
139,255

74,150
87,670
57,584
61,665
62,043
254,830
18,635
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
41,189
83,744
557,749
62,908
91,190
33,812
54,546
101,282
60,517

204,018
669,099
215,493
162,927
164,794
193,229
59,374
68,655
312,785
824,888
3,383,551
3,480,705
486,857
645,547
535,530
248,662
576,695
6,432,882

4,043
43,426
314,109
495,290
235,172
249,748
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
260,786
13,573
14,494

117,926
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
ESPECIFICACIONES TÉCNICAS INVIAS 2007)

152,777
53,673
2,613,971
933,801
89,524
1,318

9,548
35,361
8,749
14,967
13,068
7,499
481
12,832

20,948

65,019

79,792

19,035

39,738

31,203

53,644
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
5,366
167,915
174,327
139,125
3,221
1,120
224,239
66,622
632,697
646,084
682,766
673,032
441,374
322,181
314,647
38,454
170,675
156,364
11,553
4,635
648,942

681,610

703,723

7,047
138,968

925,264
798,952
845,713
577,575
674,044
573,932
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno
670,257
732,963
593,610
777,110
11,890
15,250
1,792
2,688,461

4,140,449
1,725,786
87,157
360,629
422,791
16,928
547,423
171,209
159,721
389,472
384,882
393,525
401,076
409,719
529,011
623,781
224,666
228,827
43,007
16,678
10,111
14,407

19,381
23,227
29,840
7,256
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno

8,266

8,592

6,125

9,218

7,519

9,218

17,693

630,522
362,887
881,526
222,218
4,425
85,809
130,730
538,492
240,577
67,900

4,043
43,426
83,702
69,635
148,530
13,573

839
ONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Paratebueno

131,984

25,566
8,310
448,890
1,804
15,456
24,996
9,497
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
p CONSTRUCCIÓN
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2
o
UN ### 1,979,594 1,996,995 2,001,345 1,999,605 1,997,865 2,009,175 2,016,136
1.2 CAMPAMENTO 9 M2 UN ### 1,155,947 1,164,647 1,166,822 1,165,952 1,165,082 1,170,737 1,174,217
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,088 14,088 14,088 14,088 14,088 14,088 14,088
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,792 15,792 15,792 15,792 15,792 15,792 15,792
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,267 18,267 18,267 18,267 18,267 18,267 18,267
1.6 CERCA EN TABLA H=2.30 M ML ### 65,237 65,237 65,237 65,237 65,237 65,237 65,237
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 45,737 45,925 45,972 45,953 45,934 46,056 46,131
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,167 21,354 21,401 21,382 21,364 21,486 21,561
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 895,039 896,716 897,086 897,097 898,402 899,920 900,670
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,350 10,350 10,350 10,350 10,350 10,350 10,350
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,730 3,730 3,730 3,730 3,730 3,730 3,730
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,667,413 2,667,413 2,667,413 2,667,413 2,667,413 2,667,413 2,667,413
1.44 RED TELEFÓNICA PROVISIONAL UN ### 247,061 247,061 247,061 247,061 247,061 247,061 247,061
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 85,468 82,041 80,327 83,754 109,455 114,595 114,595
2.2 BASE ARENA CEMENTO 1:20 M3 ### 172,146 185,558 188,911 187,570 186,229 194,945 200,310
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,011 22,011 22,011 22,011 22,011 22,011 22,011
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 625,069 643,527 648,142 646,296 644,450 656,448 663,832
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 626,380 645,447 650,215 648,307 646,401 658,795 666,422
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 583,516 601,370 605,834 604,048 602,263 613,868 621,010
2.9 PILOTE DE MADERA D=20 CM ML ### 49,622 49,622 49,622 49,622 49,622 49,622 49,622
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM)
ML ### 153,026 153,026 153,026 153,026 153,026 153,026 153,026
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 DISTANCIA MENOR DE 5 KM) ML ### 190,676 190,676 190,676 190,676 190,676 190,676 190,676
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 DISTANCIA MENOR DE 5 KM) ML ### 236,206 236,206 236,206 236,206 236,206 236,206 236,206
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 DISTANCIA MENOR DE 5 KM)
ML ### 297,497 297,497 297,497 297,497 297,497 297,497 297,497
2.14 PILOTE HINCADO 25X25 ML ### 103,581 104,875 105,198 105,069 104,939 105,780 106,298
2.15 PILOTE HINCADO 30X30 ML ### 127,539 129,413 129,882 129,695 129,507 130,726 131,476
2.16 DADOS EN CONCRETO 3500PSI M3 ### 569,367 587,221 591,685 589,899 588,114 599,719 606,861
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 91,553 91,553 91,553 91,553 91,553 91,553 91,553

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 38,020 38,104 38,125 38,116 38,108 38,162 38,195
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
3.2 SIFÓN EN PVC 6" UN ###
i 196,571 196,654 196,675 196,667 196,659 196,713 196,746
p
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### i 443,712 449,106 450,041 450,988 462,671 469,728 472,546
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### o 222,780 224,884 225,375 225,290 226,111 227,778 228,676
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 253,106 256,609 257,430 257,277 258,546 261,294 262,782
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 331,886 337,992 339,464 339,051 340,060 344,500 347,030
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 104,387 104,367 104,357 104,377 104,526 104,556 104,556
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,273,604 1,273,405 1,273,305 1,273,504 1,274,997 1,275,295 1,275,295
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 113,253 114,173 114,403 114,311 114,219 114,817 115,186
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 71,552 72,037 72,159 72,110 72,062 72,377 72,571
3.11 TUBERÍA DRENAJE PVC 110 ML ### 27,646 27,980 28,063 28,030 27,996 28,213 28,346
3.12 TUBERÍA DRENAJE PVC 160 ML ### 44,535 44,868 44,952 44,918 44,885 45,102 45,235
3.13 TUBERÍA DRENAJE PVC 200 ML ### 58,407 58,873 58,990 58,943 58,897 59,200 59,387
3.14 TUBERÍA DRENAJE PVC 250 ML ### 79,924 80,457 80,591 80,537 80,484 80,831 81,044
3.15 TUBERÍA DRENAJE PVC 315 ML ### 110,603 111,069 111,186 111,139 111,093 111,396 111,583
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 949,038 954,372 955,705 955,172 954,638 958,105 960,239
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
3.17 FILTRANTE) UN ### 1,340,174 1,350,842 1,353,509 1,352,442 1,351,375 1,358,309 1,362,576
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3.18 FILTRANTE) UN ### 1,743,001 1,764,336 1,769,670 1,767,536 1,765,403 1,779,270 1,787,804

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 41,994 41,994 41,994 41,994 41,994 41,994 41,994
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 55,402 55,402 55,402 55,402 55,402 55,402 55,402
4.3 COLUMNAS 3500 PSI M3 ### 789,009 806,863 811,327 809,541 807,756 819,361 826,503
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 240,939 252,231 255,785 253,444 253,192 269,871 261,684
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI M2 ### 96,546 98,279 98,713 98,539 98,366 99,493 100,186
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 113,799 115,880 116,400 116,192 115,984 117,336 118,168

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 126,912 129,686 130,379 130,102 129,824 131,627 132,736

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 133,884 136,831 137,567 137,273 136,978 138,893 140,072

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 153,144 156,784 157,694 157,330 156,966 159,332 160,788

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 170,226 174,386 175,426 175,010 174,594 177,298 178,962
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### p 188,870 193,550 194,720 194,252 193,784 196,826 198,698
i
4.12 ENTREPISO VIGUETA PLACA M2 ### o 98,811 99,111 99,185 99,155 99,125 99,320 99,440
4.13 ESCALERA MACIZA 3500 PSI M3 ### 936,098 953,952 958,416 956,630 954,845 966,450 973,592
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 94,532 94,772 94,832 94,808 94,784 94,940 95,036
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 77,610 79,396 79,842 79,664 79,485 80,646 81,360
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 87,133 89,317 89,863 89,644 89,426 90,845 91,719
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 101,358 104,097 104,782 104,508 104,234 106,014 107,110
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 688,854 706,708 711,172 709,386 707,601 719,206 726,348

4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,831 49,378 49,515 49,460 49,406 49,761 49,980

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 273,932 281,906 283,900 283,102 282,305 287,488 290,677
4.21 ACERO FIGURADO 37000 PSI KG ### 4,165 4,165 4,165 4,165 4,165 4,165 4,165
4.22 ACERO FIGURADO 60000 PSI KG ### 4,369 4,369 4,369 4,369 4,369 4,369 4,369
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,143 6,143 6,143 6,143 6,143 6,143 6,143
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 835,691 853,545 858,010 856,223 854,439 866,044 873,186
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 758,637 778,180 783,066 781,111 779,157 791,860 799,677
4.26 VIGA AÉREA 3500 PSI M3 ### 829,552 847,406 851,870 850,084 848,299 859,904 867,046
4.27 VIGA CINTA 3500 PSI M3 ### 809,469 827,323 831,787 830,001 828,216 839,821 846,963
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,019,896 1,037,750 1,042,214 1,040,428 1,038,643 1,050,248 1,057,390
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 305,389 325,303 330,282 328,290 326,299 339,243 347,209

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,212 29,660 29,772 29,727 29,682 29,974 30,153
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,585 50,033 50,145 50,100 50,056 50,347 50,526
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 34,859 34,942 34,963 34,955 34,947 35,001 35,034
5.4 ARCOS EN LADRILLO PRENSADO ML ### 163,507 163,674 163,716 163,699 163,682 163,790 163,857
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,626 44,173 44,310 44,256 44,201 44,556 44,775
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,896 27,136 27,196 27,172 27,148 27,304 27,400
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 98,195 98,528 98,611 98,578 98,545 98,761 98,895
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 89,112 90,936 91,392 91,210 91,027 92,213 92,943
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 91,183 91,183 91,183 91,183 91,183 91,183 91,183
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,515 53,515 53,515 53,515 53,515 53,515 53,515
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 87,825 87,825 87,825 87,825 87,825 87,825 87,825
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,836 51,836 51,836 51,836 51,836 51,836 51,836
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 101,774 101,774 101,774 101,774 101,774 101,774 101,774
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,132 60,132 60,132 60,132 60,132 60,132 60,132
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ###
i 113,168 113,168 113,168 113,168 113,168 113,168 113,168
p
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### i 65,829 65,829 65,829 65,829 65,829 65,829 65,829
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### o 40,354 40,521 40,563 40,547 40,530 40,639 40,706
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,491 24,574 24,595 24,587 24,579 24,633 24,667
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 52,713 52,824 52,852 52,841 52,830 52,902 52,947
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 31,736 31,791 31,805 31,800 31,794 31,831 31,853
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,328 59,440 59,468 59,457 59,446 59,518 59,563
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 35,717 35,773 35,787 35,781 35,776 35,812 35,834
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 97,953 98,511 98,650 98,594 98,539 98,901 99,125
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,055 58,334 58,404 58,376 58,348 58,530 58,641
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,073 37,185 37,212 37,201 37,190 37,263 37,307
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,517 22,573 22,587 22,581 22,576 22,612 22,634
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 73,706 73,929 73,985 73,962 73,940 74,085 74,174
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,514 44,626 44,654 44,642 44,631 44,704 44,748
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 87,583 87,823 87,883 87,859 87,835 87,991 88,087
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,130 53,250 53,280 53,268 53,256 53,334 53,382
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 180,171 180,953 181,148 181,070 180,992 181,500 181,812
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 108,480 108,870 108,968 108,929 108,890 109,144 109,300
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 89,573 90,074 90,199 90,149 90,099 90,424 90,624
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,125 54,375 54,438 54,413 54,388 54,551 54,651
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 46,388 46,638 46,700 46,675 46,650 46,813 46,913
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,293 28,417 28,449 28,436 28,424 28,505 28,555
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,569 33,681 33,709 33,698 33,687 33,759 33,804
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,490 20,546 20,560 20,555 20,549 20,585 20,608
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 50,568 50,791 50,847 50,825 50,802 50,947 51,037
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,065 31,177 31,204 31,193 31,182 31,255 31,299
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 97,683 98,017 98,101 98,068 98,034 98,252 98,386
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 59,589 59,757 59,799 59,782 59,765 59,874 59,941
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 71,384 71,607 71,663 71,641 71,619 71,764 71,853
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,173 43,284 43,312 43,301 43,290 43,363 43,407
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 149,494 150,275 150,471 150,393 150,314 150,822 151,135
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 91,137 91,528 91,626 91,587 91,548 91,802 91,958
5.47 REMATES LADRILLO PRENSADO ML ### 31,589 31,672 31,693 31,685 31,676 31,730 31,764
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,316 36,676 36,766 36,730 36,694 36,928 37,072
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,359 61,839 61,959 61,911 61,863 62,175 62,367
5.50 LAVADA DE FACHADA M2 ### 5,245 5,245 5,245 5,245 5,245 5,245 5,245
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,946 50,394 50,506 50,461 50,416 50,708 50,887
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
5.52 DOVELA, GROUTING 3000 PSI ML ###
i 10,600 10,600 10,600 10,600 10,600 10,600 10,600
p
5.53 ANCLAJE 3/8" L=30CM UN ### i 13,962 13,962 13,962 13,962 13,962 13,962 13,962
5.54 ANCLAJE 1/2" L=50CM UN ### o 18,232 18,232 18,232 18,232 18,232 18,232 18,232
5.55 ANCLAJE 5/8" L=70CM UN ### 25,448 25,448 25,448 25,448 25,448 25,448 25,448
5.56 ANCLAJE 3/4" L=70CM UN ### 37,847 37,847 37,847 37,847 37,847 37,847 37,847
5.57 ANCLAJE 1" L= 70CM UN ### 4,811 4,945 4,978 4,965 4,952 5,039 5,092

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,136 16,136 16,136 16,136 16,136 16,136 16,136
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,599 5,682 5,703 5,695 5,686 5,741 5,774
6.3 FILOS O DILATACIONES S/MURO ML ### 6,785 6,868 6,889 6,881 6,872 6,926 6,960
6.4 GOTERA EN MORTERO 1:4 ML ### 8,058 8,141 8,162 8,154 8,145 8,200 8,233
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
6.6 MALLA BAJO ENTRAMADO M2 ### 13,678 13,678 13,678 13,678 13,678 13,678 13,678
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,222 24,572 24,660 24,625 24,590 24,818 24,958
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,705 14,880 14,924 14,906 14,889 15,003 15,073
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 20,674 20,908 20,967 20,944 20,920 21,072 21,166
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,621 12,738 12,767 12,756 12,744 12,820 12,867
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 20,331 20,681 20,769 20,734 20,699 20,927 21,067
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,449 12,625 12,668 12,651 12,633 12,747 12,817
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 20,674 20,908 20,967 20,944 20,920 21,072 21,166
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,621 12,738 12,767 12,756 12,744 12,820 12,867
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 21,526 21,775 21,838 21,813 21,788 21,950 22,050
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,046 13,170 13,202 13,189 13,177 13,258 13,308
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,234 17,413 17,457 17,439 17,421 17,538 17,609
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,612 10,702 10,724 10,715 10,706 10,764 10,800
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,973 17,239 17,306 17,280 17,253 17,426 17,533
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,482 10,615 10,649 10,635 10,622 10,709 10,762
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 21,452 21,687 21,745 21,722 21,698 21,851 21,944
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 12,990 13,107 13,136 13,125 13,113 13,189 13,236
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,109 21,460 21,547 21,512 21,477 21,705 21,845
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,818 12,994 13,037 13,020 13,002 13,116 13,186
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,583 17,850 17,917 17,890 17,863 18,037 18,143
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,769 10,902 10,936 10,922 10,909 10,996 11,049
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 21,999 22,349 22,436 22,401 22,366 22,594 22,734
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,667 13,843 13,886 13,869 13,851 13,965 14,035
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
7 CUBIERTAS
i
p
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### i 26,199 26,534 26,618 26,584 26,551 26,768 26,902
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO M2 ###
o 82,049 82,961 83,189 83,098 83,006 83,599 83,964
(INCLUYE TELA IMPERMEABLE)
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,101 55,101 55,101 55,101 55,101 55,101 55,101
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,063 22,063 22,063 22,063 22,063 22,063 22,063
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,607 34,607 34,607 34,607 34,607 34,607 34,607
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 80,424 80,424 80,424 80,424 80,424 80,424 80,424
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,043 63,043 63,043 63,043 63,043 63,043 63,043
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 36,795 36,795 36,795 36,795 36,795 36,795 36,795
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 84,273 84,273 84,273 84,273 84,273 84,273 84,273
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 100,568 100,568 100,568 100,568 100,568 100,568 100,568
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 147,651 147,651 147,651 147,651 147,651 147,651 147,651
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 58,557 58,557 58,557 58,557 58,557 58,557 58,557
7.13 CANAL PVC AMAZONAS ML ### 81,490 81,490 81,490 81,490 81,490 81,490 81,490
7.14 CANAL PVC RAINGO ML ### 74,141 74,141 74,141 74,141 74,141 74,141 74,141
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 131,054 131,054 131,054 131,054 131,054 131,054 131,054
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 76,466 76,466 76,466 76,466 76,466 76,466 76,466
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 56,237 56,237 56,237 56,237 56,237 56,237 56,237
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,291 32,291 32,291 32,291 32,291 32,291 32,291
7.19 TEJA DE BARRO M2 ### 58,498 58,914 59,019 58,977 58,935 59,206 59,373
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 46,872 46,872 46,872 46,872 46,872 46,872 46,872
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 42,987 42,987 42,987 42,987 42,987 42,987 42,987
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,454 36,454 36,454 36,454 36,454 36,454 36,454
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 35,677 35,677 35,677 35,677 35,677 35,677 35,677
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 35,944 35,944 35,944 35,944 35,944 35,944 35,944
7.25 TEJA TERMOACÚSTICA M2 ### 50,430 50,430 50,430 50,430 50,430 50,430 50,430
7.26 TEJA PLÁSTICA No.6 M2 ### 44,376 44,376 44,376 44,376 44,376 44,376 44,376
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 80,992 80,992 80,992 80,992 80,992 80,992 80,992

7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 149,274 149,274 149,274 149,274 149,274 149,274 149,274

7.29 TEJA SIN TRASLAPO M2 ### 67,210 67,210 67,210 67,210 67,210 67,210 67,210
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,592 42,592 42,592 42,592 42,592 42,592 42,592
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,300 33,300 33,300 33,300 33,300 33,300 33,300
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 57,762 57,762 57,762 57,762 57,762 57,762 57,762
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,046 20,046 20,046 20,046 20,046 20,046 20,046
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ###
i 24,053 24,053 24,053 24,053 24,053 24,053 24,053
p
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### i 26,014 26,014 26,014 26,014 26,014 26,014 26,014
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### o 33,410 33,410 33,410 33,410 33,410 33,410 33,410
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,134 22,134 22,134 22,134 22,134 22,134 22,134
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,069 52,069 52,069 52,069 52,069 52,069 52,069
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 353,091 353,091 353,091 353,091 353,091 353,091 353,091
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 409,169 409,169 409,169 409,169 409,169 409,169 409,169
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 269,418 269,418 269,418 269,418 269,418 269,418 269,418
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 287,538 287,538 287,538 287,538 287,538 287,538 287,538

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 435,191 453,938 458,625 456,750 454,876 467,061 474,560
8.2 CONCRETO 3500 PSI M3 ### 380,074 397,408 401,742 400,008 398,275 409,542 416,476
8.3 CONCRETO 3000 PSI M3 ### 378,274 396,195 400,675 398,883 397,091 408,739 415,908
8.4 CONCRETO 2500 PSI M3 ### 333,277 351,518 356,078 354,254 352,430 364,286 371,583
8.5 CONCRETO 2000 PSI M3 ### 310,372 329,133 333,823 331,947 330,071 342,265 349,770
8.6 CONCRETO 1500 PSI M3 ### 281,383 300,717 305,551 303,617 301,684 314,251 321,985
8.7 MORTERO SECO 1:10 M3 ### 218,031 229,527 232,401 231,252 230,102 237,574 242,172
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 428,616 439,778 442,569 441,453 440,336 447,591 452,056
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 412,285 428,965 433,135 431,467 429,799 440,641 447,313
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 472,925 488,525 492,425 490,865 489,305 499,445 505,685
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 696,845 712,445 716,345 714,785 713,225 723,365 729,605

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 122,736 122,736 122,736 122,736 122,736 122,736 122,736
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,817 3,901 3,922 3,913 3,905 3,959 3,992
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 137,566 137,566 137,566 137,566 137,566 137,566 137,566
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 168,219 168,219 168,219 168,219 168,219 168,219 168,219
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 243,574 243,574 243,574 243,574 243,574 243,574 243,574
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 271,046 271,046 271,046 271,046 271,046 271,046 271,046
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 298,550 298,550 298,550 298,550 298,550 298,550 298,550
9.8 HOJA PUERTA FORTEC 0.81 UN ### 198,132 198,132 198,132 198,132 198,132 198,132 198,132
9.9 HOJA PUERTA FORTEC 0.91 UN ### 224,575 224,575 224,575 224,575 224,575 224,575 224,575
9.10 HOJA PUERTA FORTEC 1.50 UN ### 330,346 330,346 330,346 330,346 330,346 330,346 330,346
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 125,414 125,414 125,414 125,414 125,414 125,414 125,414
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 166,401 166,401 166,401 166,401 166,401 166,401 166,401
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 184,911 184,911 184,911 184,911 184,911 184,911 184,911
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ###
i 470,494 470,494 470,494 470,494 470,494 470,494 470,494
p
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### i 42,014 42,014 42,014 42,014 42,014 42,014 42,014
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### o 26,297 26,297 26,297 26,297 26,297 26,297 26,297
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 99,346 99,346 99,346 99,346 99,346 99,346 99,346
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 120,444 120,444 120,444 120,444 120,444 120,444 120,444
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,604 93,604 93,604 93,604 93,604 93,604 93,604
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,136 29,136 29,136 29,136 29,136 29,136 29,136
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,136 29,136 29,136 29,136 29,136 29,136 29,136
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,629 27,629 27,629 27,629 27,629 27,629 27,629
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,302 42,302 42,302 42,302 42,302 42,302 42,302
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,317 52,317 52,317 52,317 52,317 52,317 52,317
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,001 63,001 63,001 63,001 63,001 63,001 63,001
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,687 75,687 75,687 75,687 75,687 75,687 75,687
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 355,631 355,631 355,631 355,631 355,631 355,631 355,631
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 248,802 248,802 248,802 248,802 248,802 248,802 248,802
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,622 33,622 33,622 33,622 33,622 33,622 33,622
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 42,970 42,970 42,970 42,970 42,970 42,970 42,970
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,317 52,317 52,317 52,317 52,317 52,317 52,317
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,672 65,672 65,672 65,672 65,672 65,672 65,672

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 75,873 75,873 75,873 75,873 75,873 75,873 75,873
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 210,157 210,157 210,157 210,157 210,157 210,157 210,157
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO) ML ### 80,468 80,468 80,468 80,468 80,468 80,468 80,468
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,502 144,502 144,502 144,502 144,502 144,502 144,502
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 136,277 136,277 136,277 136,277 136,277 136,277 136,277
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,483 89,483 89,483 89,483 89,483 89,483 89,483
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 210,628 210,628 210,628 210,628 210,628 210,628 210,628
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 109,871 109,871 109,871 109,871 109,871 109,871 109,871
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,601 6,601 6,601 6,601 6,601 6,601 6,601
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 99,743 99,743 99,743 99,743 99,743 99,743 99,743
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H:
10,10(1) 2.00 MTS
M2 ### 120,530 120,530 120,530 120,530 120,530 120,530 120,530
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,054 41,054 41,054 41,054 41,054 41,054 41,054

10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 535,497 535,497 535,497 535,497 535,497 535,497 535,497
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ###
i 192,886 192,886 192,886 192,886 192,886 192,886 192,886
p
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### i 217,016 217,016 217,016 217,016 217,016 217,016 217,016
o
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
10.15 PUERTAS Y ACCESORIOS) M2 ### 488,603 488,603 488,603 488,603 488,603 488,603 488,603

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 128,544 128,544 128,544 128,544 128,544 128,544 128,544
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 390,356 390,356 390,356 390,356 390,356 390,356 390,356
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,027 6,027 6,027 6,027 6,027 6,027 6,027
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 274,896 274,896 274,896 274,896 274,896 274,896 274,896
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 122,260 122,260 122,260 122,260 122,260 122,260 122,260
10.21 REJILLA PISO 0.30 M M2 ### 85,960 85,960 85,960 85,960 85,960 85,960 85,960
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 88,817 88,817 88,817 88,817 88,817 88,817 88,817
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,589 10,589 10,589 10,589 10,589 10,589 10,589
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,735 11,735 11,735 11,735 11,735 11,735 11,735
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,355 9,355 9,355 9,355 9,355 9,355 9,355
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 221,230 221,230 221,230 221,230 221,230 221,230 221,230
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 266,345 266,345 266,345 266,345 266,345 266,345 266,345
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,063 22,063 22,063 22,063 22,063 22,063 22,063
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 34,607 34,607 34,607 34,607 34,607 34,607 34,607
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,258 33,258 33,258 33,258 33,258 33,258 33,258
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 42,584 42,584 42,584 42,584 42,584 42,584 42,584
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 87,646 87,646 87,646 87,646 87,646 87,646 87,646
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 222,576 222,576 222,576 222,576 222,576 222,576 222,576
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,278 44,278 44,278 44,278 44,278 44,278 44,278
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
11.12 LLAVE MANGUERA UN ###
i 35,098 35,098 35,098 35,098 35,098 35,098 35,098
p
11.13 NIPLE PASAMURO 2" UN ### i 66,942 66,942 66,942 66,942 66,942 66,942 66,942
11.14 NIPLE PASAMURO 4" UN ### o 99,975 99,975 99,975 99,975 99,975 99,975 99,975
11.15 PUNTO AGUA CALIENTE CPVC UN ### 84,191 84,191 84,191 84,191 84,191 84,191 84,191
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 61,663 61,663 61,663 61,663 61,663 61,663 61,663
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 65,533 65,533 65,533 65,533 65,533 65,533 65,533
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 82,798 82,798 82,798 82,798 82,798 82,798 82,798
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 66,573 66,573 66,573 66,573 66,573 66,573 66,573
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 83,091 83,091 83,091 83,091 83,091 83,091 83,091
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 88,815 88,815 88,815 88,815 88,815 88,815 88,815
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 73,387 73,387 73,387 73,387 73,387 73,387 73,387
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,458 12,458 12,458 12,458 12,458 12,458 12,458
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,501 17,501 17,501 17,501 17,501 17,501 17,501
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 22,858 22,858 22,858 22,858 22,858 22,858 22,858
11.26 RED SUMINISTRO PVC 1" ML ### 14,144 14,144 14,144 14,144 14,144 14,144 14,144
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,467 8,467 8,467 8,467 8,467 8,467 8,467
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 50,815 50,815 50,815 50,815 50,815 50,815 50,815
11.29 RED SUMINISTRO PVC 2" ML ### 32,539 32,539 32,539 32,539 32,539 32,539 32,539
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,590 10,590 10,590 10,590 10,590 10,590 10,590
11.31 RED SANITARIA PVC-S 2" ML ### 25,172 25,172 25,172 25,172 25,172 25,172 25,172
11.32 RED SANITARIA PVC-S 3" ML ### 34,893 34,893 34,893 34,893 34,893 34,893 34,893
11.33 RED SANITARIA PVC-S 4" ML ### 47,330 47,330 47,330 47,330 47,330 47,330 47,330
11.34 RED SANITARIA PVC-S 6" ML ### 88,258 88,258 88,258 88,258 88,258 88,258 88,258
11.35 REGISTRO 1" UN ### 107,379 107,379 107,379 107,379 107,379 107,379 107,379
11.36 REGISTRO 1/2" UN ### 59,895 59,895 59,895 59,895 59,895 59,895 59,895
11.37 REGISTRO 3/4" UN ### 76,183 76,183 76,183 76,183 76,183 76,183 76,183
11.38 REGISTRO 1 1/2" UN ### 183,799 183,799 183,799 183,799 183,799 183,799 183,799
11.39 REGISTRO 2 1/2" UN ### 378,656 378,656 378,656 378,656 378,656 378,656 378,656
11.40 REGISTRO 2" UN ### 279,913 279,913 279,913 279,913 279,913 279,913 279,913
11.41 REVENTILACIÓN 2" ML ### 17,573 17,573 17,573 17,573 17,573 17,573 17,573
11.42 REVENTILACIÓN 3" ML ### 22,169 22,169 22,169 22,169 22,169 22,169 22,169
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN) UN ### 172,393 172,393 172,393 172,393 172,393 172,393 172,393
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11.44 ISNTALACIÓN) UN ### 280,276 280,276 280,276 280,276 280,276 280,276 280,276
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11.45 INSTALACIÓN)
UN ### 466,160 466,160 466,160 466,160 466,160 466,160 466,160
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
11.46 ML ### p 40,312 40,312 40,312 40,312 40,312 40,312 40,312
SOPORTES)
i
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS
11.47 ML ### o 47,520 47,520 47,520 47,520 47,520 47,520 47,520
Y SOPORTES)
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11.48 SOPORTES) ML ### 61,119 61,119 61,119 61,119 61,119 61,119 61,119
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11.49 SOPORTES)
ML ### 69,164 69,164 69,164 69,164 69,164 69,164 69,164
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11.50 ACCESORIOS Y SOPORTES)
ML ### 89,101 89,101 89,101 89,101 89,101 89,101 89,101
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11.51 SOPORTES) ML ### 103,456 103,456 103,456 103,456 103,456 103,456 103,456

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y


11.52 SOPORTES) ML ### 153,112 153,112 153,112 153,112 153,112 153,112 153,112
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 61,786 61,786 61,786 61,786 61,786 61,786 61,786
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,036 62,036 62,036 62,036 62,036 62,036 62,036
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 39,900 39,900 39,900 39,900 39,900 39,900 39,900
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 49,102 49,102 49,102 49,102 49,102 49,102 49,102

11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,152 4,152 4,152 4,152 4,152 4,152 4,152

11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,535 6,535 6,535 6,535 6,535 6,535 6,535

11.59 GABINETE TIPO III UN ### 1,010,813 1,010,813 1,010,813 1,010,813 1,010,813 1,010,813 1,010,813
11.60 GABINETE TIPO I UN ### 773,091 773,091 773,091 773,091 773,091 773,091 773,091
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,589,429 2,589,429 2,589,429 2,589,429 2,589,429 2,589,429 2,589,429
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,159,383 2,159,383 2,159,383 2,159,383 2,159,383 2,159,383 2,159,383
11.63 VÁLVULA MARIPOSA 3" UN ### 629,188 629,188 629,188 629,188 629,188 629,188 629,188
11.64 VÁLVULA MARIPOSA 4" UN ### 813,231 813,231 813,231 813,231 813,231 813,231 813,231
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 312,125 312,125 312,125 312,125 312,125 312,125 312,125

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 362,010 362,010 362,010 362,010 362,010 362,010 362,010
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 57,515 57,515 57,515 57,515 57,515 57,515 57,515
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 68,043 68,043 68,043 68,043 68,043 68,043 68,043
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 75,599 75,599 75,599 75,599 75,599 75,599 75,599
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 88,985 88,985 88,985 88,985 88,985 88,985 88,985
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,094 54,094 54,094 54,094 54,094 54,094 54,094
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,641 61,641 61,641 61,641 61,641 61,641 61,641
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
12.8 STRIP TELEFÓNICO 10 PARES UN ###
i 142,598 142,598 142,598 142,598 142,598 142,598 142,598
p
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### i 55,532 55,532 55,532 55,532 55,532 55,532 55,532
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### o 127,555 127,555 127,555 127,555 127,555 127,555 127,555
12.11 SALIDA T.V PVC COMPLETA. UN ### 76,332 76,332 76,332 76,332 76,332 76,332 76,332
12.12 SALIDA BIFÁSICA C.N. UN ### 45,257 45,257 45,257 45,257 45,257 45,257 45,257
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,522 95,522 95,522 95,522 95,522 95,522 95,522
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 407,996 407,996 407,996 407,996 407,996 407,996 407,996
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 543,161 543,161 543,161 543,161 543,161 543,161 543,161
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,516 3,516 3,516 3,516 3,516 3,516 3,516
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,644 4,644 4,644 4,644 4,644 4,644 4,644
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,221 7,221 7,221 7,221 7,221 7,221 7,221
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,920 12,920 12,920 12,920 12,920 12,920 12,920
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 271,336 271,336 271,336 271,336 271,336 271,336 271,336
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,760 76,760 76,760 76,760 76,760 76,760 76,760
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 103,755 103,755 103,755 103,755 103,755 103,755 103,755
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,606 42,606 42,606 42,606 42,606 42,606 42,606
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,393,269 1,393,269 1,393,269 1,393,269 1,393,269 1,393,269 1,393,269
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,032,687 1,032,687 1,032,687 1,032,687 1,032,687 1,032,687 1,032,687
12.26 POSTE METÁLICO 6M UN ### 1,286,640 1,286,640 1,286,640 1,286,640 1,286,640 1,286,640 1,286,640
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 597,865 597,865 597,865 597,865 597,865 597,865 597,865
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 109,495 109,495 109,495 109,495 109,495 109,495 109,495
12.29 LUMINARIA 70W SODIO UN ### 501,512 501,512 501,512 501,512 501,512 501,512 501,512
12.30 LUMINARIA 150W SODIO UN ### 627,282 627,282 627,282 627,282 627,282 627,282 627,282
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,655,849 1,655,849 1,655,849 1,655,849 1,655,849 1,655,849 1,655,849
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,219,541 1,219,541 1,219,541 1,219,541 1,219,541 1,219,541 1,219,541

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 39,704 40,304 40,454 40,394 40,334 40,724 40,964
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,311 39,911 40,061 40,001 39,941 40,331 40,571
13.3 ALISTADO PARA LISTÓN M2 ### 14,755 14,875 14,905 14,893 14,881 14,959 15,007
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 27,933 29,133 29,433 29,313 29,193 29,973 30,453
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 84,656 85,856 86,156 86,036 85,916 86,696 87,176
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,455 26,830 26,924 26,887 26,849 27,093 27,243
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 56,057 57,881 58,337 58,155 57,972 59,158 59,888
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 77,268 80,186 80,916 80,624 80,332 82,229 83,397
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,365 30,365 30,365 30,365 30,365 30,365 30,365
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,071 23,071 23,071 23,071 23,071 23,071 23,071
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
13.11 PERMA PLY 2 CAPAS M2 ###
i 27,110 27,110 27,110 27,110 27,110 27,110 27,110
p
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### i 45,454 47,096 47,506 47,342 47,178 48,245 48,902
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### o 53,161 55,168 55,669 55,469 55,268 56,572 57,375
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 76,818 79,919 80,695 80,385 80,074 82,090 83,330
13.15 TRITURADO FINO 1/2 M3 ### 90,319 104,053 107,487 106,113 104,740 113,667 119,161
13.16 TRITURADO GRUESO 3/4 M3 ### 94,357 105,295 107,831 107,453 112,250 121,071 125,764

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,326 57,566 57,626 57,602 57,578 57,734 57,830
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,334 34,454 34,484 34,472 34,460 34,538 34,586
14.3 ADOQUÍN CONCRETO 6CM M2 ### 65,497 66,097 66,247 66,187 66,127 66,517 66,757
14.4 ADOQUÍN CONCRETO 8CM M2 ### 68,797 69,397 69,547 69,487 69,427 69,817 70,057
14.5 ADOQUÍN GRES PEATONAL M2 ### 73,077 73,677 73,827 73,767 73,707 74,097 74,337
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO M2 ### 75,438 75,678 75,738 75,714 75,690 75,846 75,942
14.7 GRAVILLA PARA GRADAS ML ### 37,503 37,750 37,812 37,788 37,763 37,924 38,023
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 164,045 165,125 165,395 165,287 165,179 165,881 166,313
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 46,617 47,232 47,386 47,325 47,263 47,663 47,909
14.10 GUARDAESCOBA EN GRANITO ML ### 44,198 44,198 44,198 44,198 44,198 44,198 44,198
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,189 10,437 10,498 10,474 10,449 10,610 10,709
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,385 9,385 9,385 9,385 9,385 9,385 9,385
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,587 12,587 12,587 12,587 12,587 12,587 12,587
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,588 10,588 10,588 10,588 10,588 10,588 10,588
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,668 17,668 17,668 17,668 17,668 17,668 17,668
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,327 34,327 34,327 34,327 34,327 34,327 34,327
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,333 9,333 9,333 9,333 9,333 9,333 9,333
14.18 LISTÓN M.H. AMARILLO M2 ### 74,724 74,724 74,724 74,724 74,724 74,724 74,724
14.19 PASO ESCALERA GRANITO ML ### 119,133 119,973 120,183 120,099 120,015 120,561 120,897
14.20 PIRLANES ALUMINIO ML ### 7,646 7,646 7,646 7,646 7,646 7,646 7,646
14.21 PIRLANES LADRILLO ML ### 31,985 32,151 32,193 32,176 32,160 32,268 32,334
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 45,983 45,983 45,983 45,983 45,983 45,983 45,983
14.23 PISO VINILO TRÁFICO PESADO M2 ### 53,393 53,393 53,393 53,393 53,393 53,393 53,393
14.24 PULIDA LACADA PISO MADERA M2 ### 49,479 49,479 49,479 49,479 49,479 49,479 49,479
14.25 TABLETA DE GRES 25X25 M2 ### 49,754 49,994 50,054 50,030 50,006 50,162 50,258
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 55,801 56,041 56,101 56,077 56,053 56,209 56,305
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,054 11,054 11,054 11,054 11,054 11,054 11,054
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 49,331 49,581 49,644 49,619 49,594 49,756 49,856
14.29 JABONERA PORCELANA ACUARIO UN ### 20,671 20,671 20,671 20,671 20,671 20,671 20,671
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE)
UN ### p 123,526 123,526 123,526 123,526 123,526 123,526 123,526
i
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### o 10,052 10,052 10,052 10,052 10,052 10,052 10,052
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,590 22,590 22,590 22,590 22,590 22,590 22,590
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,548 14,548 14,548 14,548 14,548 14,548 14,548
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,138 14,138 14,138 14,138 14,138 14,138 14,138
14.35 REMATES BOCEL ALUMINIO ML ### 8,651 8,651 8,651 8,651 8,651 8,651 8,651
14.36 REMATES BOCEL PORCELANA ML ### 8,801 8,801 8,801 8,801 8,801 8,801 8,801
14.37 TAPA REGISTRO 20X20 UN ### 19,162 19,162 19,162 19,162 19,162 19,162 19,162
14.38 TAPA REGISTRO 6X6 UN ### 17,476 17,476 17,476 17,476 17,476 17,476 17,476
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,642 18,642 18,642 18,642 18,642 18,642 18,642
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO M2 ### 21,551 21,551 21,551 21,551 21,551 21,551 21,551
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 65,393 65,633 65,693 65,669 65,645 65,801 65,897
14.42 MEDIA CAÑA EN GRANITO ML ### 77,468 77,468 77,468 77,468 77,468 77,468 77,468
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,601 34,601 34,601 34,601 34,601 34,601 34,601
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,345 13,345 13,345 13,345 13,345 13,345 13,345
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 101,598 101,598 101,598 101,598 101,598 101,598 101,598
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 123,110 123,110 123,110 123,110 123,110 123,110 123,110

15 CIELO RASO
15.1 APLIQUE YESO ML ### 72,806 72,806 72,806 72,806 72,806 72,806 72,806
15.2 ARMADURA MADERA Y MALLA M2 ### 36,314 36,314 36,314 36,314 36,314 36,314 36,314
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 55,738 55,738 55,738 55,738 55,738 55,738 55,738
15.4 CIELO RASO DURACUSTIC M2 ### 68,287 68,287 68,287 68,287 68,287 68,287 68,287
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,011 51,011 51,011 51,011 51,011 51,011 51,011
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 94,378 94,378 94,378 94,378 94,378 94,378 94,378
15.7 CORNISAS YESO ML ### 48,840 48,840 48,840 48,840 48,840 48,840 48,840
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 104,217 104,217 104,217 104,217 104,217 104,217 104,217
15.9 MALLA CON VENA M2 ### 13,583 13,583 13,583 13,583 13,583 13,583 13,583

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 43,707 43,707 43,707 43,707 43,707 43,707 43,707
i
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 M3 ### o 49,987 49,987 49,987 49,987 49,987 49,987 49,987
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005 85,005 85,005

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 76,028 72,602 70,888 74,315 100,016 105,156 105,156
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 93,018 107,054 110,563 109,159 107,755 116,879 122,493
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 144,687 144,687 144,687 182,381 144,687 144,687 182,381
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 75,374 71,947 70,233 73,660 99,361 104,501 104,501
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 135,927 135,927 135,927 173,622 135,927 135,927 173,622
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 141,656 141,656 141,656 179,351 141,656 141,656 179,351

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 302,096 302,096 302,096 302,096 302,096 302,096 302,096
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 GRIFERÍA) UN ### 888,820 888,820 888,820 888,820 888,820 888,820 888,820

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 481,963 481,963 481,963 481,963 481,963 481,963 481,963

17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 140,487 140,487 140,487 140,487 140,487 140,487 140,487

17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 196,192 196,192 196,192 196,192 196,192 196,192 196,192
SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
17.6 GRIFERÍA) UN ### 182,270 182,270 182,270 182,270 182,270 182,270 182,270
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 400,122 400,122 400,122 400,122 400,122 400,122 400,122
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
17.8 GRIFERÍA) UN ### 1,022,014 1,022,014 1,022,014 1,022,014 1,022,014 1,022,014 1,022,014
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 290,913 290,913 290,913 290,913 290,913 290,913 290,913
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 206,462 206,462 206,462 206,462 206,462 206,462 206,462
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,675 82,675 82,675 82,675 82,675 82,675 82,675
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 249,662 249,662 249,662 249,662 249,662 249,662 249,662
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 367,333 367,333 367,333 367,333 367,333 367,333 367,333
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
18 PINTURAS
i
p
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### i 8,382 8,382 8,382 8,382 8,382 8,382 8,382
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### o 3,100 3,100 3,100 3,100 3,100 3,100 3,100
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,198 11,198 11,198 11,198 11,198 11,198 11,198
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,377 42,377 42,377 42,377 42,377 42,377 42,377
18.5 CARBURO SOBRE PAÑETES M2 ### 5,868 5,868 5,868 5,868 5,868 5,868 5,868
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 65,580 65,580 65,580 65,580 65,580 65,580 65,580
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,495 3,495 3,495 3,495 3,495 3,495 3,495
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,785 2,785 2,785 2,785 2,785 2,785 2,785
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,003 14,003 14,003 14,003 14,003 14,003 14,003
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,052 4,052 4,052 4,052 4,052 4,052 4,052
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,763 14,763 14,763 14,763 14,763 14,763 14,763
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,750 5,750 5,750 5,750 5,750 5,750 5,750
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,549 6,549 6,549 6,549 6,549 6,549 6,549
18.14 ESTUCO M2 ### 7,066 7,066 7,066 7,066 7,066 7,066 7,066
18.15 ESTUCO (LINEAL) ML ### 4,428 4,428 4,428 4,428 4,428 4,428 4,428
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,595 15,595 15,595 15,595 15,595 15,595 15,595
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,676 9,676 9,676 9,676 9,676 9,676 9,676
18.18 LACA PISOS MADERA M2 ### 22,909 22,909 22,909 22,909 22,909 22,909 22,909
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,701 2,701 2,701 2,701 2,701 2,701 2,701
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,192 12,192 12,192 12,192 12,192 12,192 12,192
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,291 3,291 3,291 3,291 3,291 3,291 3,291
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,649 12,649 12,649 12,649 12,649 12,649 12,649
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,117 7,117 7,117 7,117 7,117 7,117 7,117
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,479 4,479 4,479 4,479 4,479 4,479 4,479
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,851 21,851 21,851 21,851 21,851 21,851 21,851
18.26 PINTURA EPÓXICA M2 ### 12,751 12,751 12,751 12,751 12,751 12,751 12,751
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,885 7,885 7,885 7,885 7,885 7,885 7,885

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,047,507 6,047,507 6,047,507 6,047,507 6,047,507 6,047,507 6,047,507
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES
19.2 Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,685,026 10,685,026 10,685,026 10,685,026 10,685,026 10,685,026 10,685,026

19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,796,384 2,796,384 2,796,384 2,796,384 2,796,384 2,796,384 2,796,384
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,138,531 9,138,531 9,138,531 9,138,531 9,138,531 9,138,531 9,138,531
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,557,471 8,557,471 8,557,471 8,557,471 8,557,471 8,557,471 8,557,471
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,701 2,701 2,701 2,701 2,701 2,701 2,701
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 858,721 858,721 858,721 858,721 858,721 858,721 858,721
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ###
i 85,733 85,733 85,733 85,733 85,733 85,733 85,733
p
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### i 1,553,050 1,553,238 1,553,284 1,553,266 1,553,247 1,553,369 1,553,444
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### o 671,611 676,092 677,212 676,764 676,316 679,228 681,020

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,386 29,386 29,386 29,386 29,386 29,386 29,386
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 43,618 43,618 43,618 43,618 43,618 43,618 43,618
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 54,061 54,061 54,061 54,061 54,061 54,061 54,061
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 17,656 17,656 17,656 17,656 17,656 17,656 17,656

20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,377 21,377 21,377 21,377 21,377 21,377 21,377
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,132 29,132 29,132 29,132 29,132 29,132 29,132
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,155 26,155 26,155 26,155 26,155 26,155 26,155
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,570 27,570 27,570 27,570 27,570 27,570 27,570
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,459 34,459 34,459 34,459 34,459 34,459 34,459
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,624 17,624 17,624 17,624 17,624 17,624 17,624
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,092 23,092 23,092 23,092 23,092 23,092 23,092
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,497 35,497 35,497 35,497 35,497 35,497 35,497
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 271,925 271,925 271,925 271,925 271,925 271,925 271,925
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 312,927 312,927 312,927 312,927 312,927 312,927 312,927
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 326,412 326,412 326,412 326,412 326,412 326,412 326,412
20.16 ACOMETIDA GAS 1/2" ML ### 302,948 302,948 302,948 302,948 302,948 302,948 302,948

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 221,143 221,143 221,143 221,143 221,143 221,143 221,143
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 33,863 33,863 33,863 33,863 33,863 33,863 33,863
21.3 SIRENA DE 110 V UN ### 103,345 103,345 103,345 103,345 103,345 103,345 103,345
21.4 CÁMARA CCTV UN ### 263,277 263,277 263,277 263,277 263,277 263,277 263,277
21.5 PARLANTE-CIELO FALSO UN ### 52,033 52,033 52,033 52,033 52,033 52,033 52,033
21.6 AMPLIFICADOR 100W UN ### 572,190 572,190 572,190 572,190 572,190 572,190 572,190
21.7 AMPLIFICADOR 300W UN ### 1,416,949 1,416,949 1,416,949 1,416,949 1,416,949 1,416,949 1,416,949
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,107 45,107 45,107 45,107 45,107 45,107 45,107
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 221,087 221,087 221,087 221,087 221,087 221,087 221,087
21.10 TOMA PARA MICRÓFONO UN ### 44,064 44,064 44,064 44,064 44,064 44,064 44,064
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,759 3,759 3,759 3,759 3,759 3,759 3,759
21.12 SPLITERS UN ### 6,301 6,301 6,301 6,301 6,301 6,301 6,301
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ###
i 18,715 18,715 18,715 18,715 18,715 18,715 18,715
p
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### i 24,509 24,509 24,509 24,509 24,509 24,509 24,509
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### o 31,801 31,801 31,801 31,801 31,801 31,801 31,801
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 122,537 122,537 122,537 122,537 122,537 122,537 122,537
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 31,975 31,975 31,975 31,975 31,975 31,975 31,975
21.18 BANDEJA PORTACABLES PARA RACK UN ### 104,462 104,462 104,462 104,462 104,462 104,462 104,462
21.19 RACK 2' X 24" UN ### 184,141 184,141 184,141 184,141 184,141 184,141 184,141
21.20 RACK 3' X 24" UN ### 288,590 288,590 288,590 288,590 288,590 288,590 288,590
21.21 RACK 5' X 24" UN ### 358,844 358,844 358,844 358,844 358,844 358,844 358,844
21.22 RACK 7' X 24" UN ### 391,898 391,898 391,898 391,898 391,898 391,898 391,898
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 575,030 575,030 575,030 575,030 575,030 575,030 575,030
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 339,061 339,061 339,061 339,061 339,061 339,061 339,061
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 103,864 103,864 103,864 103,864 103,864 103,864 103,864
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 13,817 13,817 13,817 13,817 13,817 13,817 13,817
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,229 28,229 28,229 28,229 28,229 28,229 28,229
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,005 5,005 5,005 5,005 5,005 5,005 5,005
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,319 35,319 35,319 35,319 35,319 35,319 35,319
21.30 CANALETA METÁLICA 4X10 CMS ML ### 36,894 36,894 36,894 36,894 36,894 36,894 36,894
21.31 CANALETA METÁLICA 6X10 CMS ML ### 37,682 37,682 37,682 37,682 37,682 37,682 37,682
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,582 24,582 24,582 24,582 24,582 24,582 24,582
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,173 27,173 27,173 27,173 27,173 27,173 27,173
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,261 28,261 28,261 28,261 28,261 28,261 28,261
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 47,401 47,401 47,401 47,401 47,401 47,401 47,401
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 612,516 612,516 612,516 612,516 612,516 612,516 612,516
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 314,943 314,943 314,943 314,943 314,943 314,943 314,943
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 88,765 88,765 88,765 88,765 88,765 88,765 88,765
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,839 1,839 1,839 1,839 1,839 1,839 1,839
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,486 8,486 8,486 8,486 8,486 8,486 8,486
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,634 12,634 12,634 12,634 12,634 12,634 12,634
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,069 21,069 21,069 21,069 21,069 21,069 21,069
21.43 CABLE TELEVISIÓN RG6 ML ### 3,912 3,912 3,912 3,912 3,912 3,912 3,912
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,458 22,458 22,458 22,458 22,458 22,458 22,458
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,621 32,621 32,621 32,621 32,621 32,621 32,621
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,415 19,415 19,415 19,415 19,415 19,415 19,415
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,383 15,383 15,383 15,383 15,383 15,383 15,383
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 617,371 617,371 617,371 617,371 617,371 617,371 617,371
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
p
i
o
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 90,400 90,400 90,400 90,400 90,400 90,400 90,400
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 508,569 508,569 508,569 508,569 508,569 508,569 508,569
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,085,443 1,085,443 1,085,443 1,085,443 1,085,443 1,085,443 1,085,443
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 124,516 124,516 124,516 124,516 124,516 124,516 124,516
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 757,851 757,851 757,851 757,851 757,851 757,851 757,851
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,630,607 1,630,607 1,630,607 1,630,607 1,630,607 1,630,607 1,630,607
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,128 13,128 13,128 13,128 13,128 13,128 13,128
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,165 16,165 16,165 16,165 16,165 16,165 16,165
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,267 20,267 20,267 20,267 20,267 20,267 20,267
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,171 22,171 22,171 22,171 22,171 22,171 22,171
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,557 26,557 26,557 26,557 26,557 26,557 26,557
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,557 26,557 26,557 26,557 26,557 26,557 26,557
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 106,379 106,379 106,379 106,379 106,379 106,379 106,379
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 123,235 123,235 123,235 123,235 123,235 123,235 123,235
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 381,304 381,304 381,304 381,304 381,304 381,304 381,304
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 143,161 143,161 143,161 143,161 143,161 143,161 143,161
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 236,002 236,002 236,002 236,002 236,002 236,002 236,002
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,043,963 1,043,963 1,043,963 1,043,963 1,043,963 1,043,963 1,043,963
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,202,753 1,202,753 1,202,753 1,202,753 1,202,753 1,202,753 1,202,753
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,201 14,201 14,201 14,201 14,201 14,201 14,201
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,541 12,541 12,541 12,541 12,541 12,541 12,541
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 30,752 30,752 30,752 30,752 30,752 30,752 30,752
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 122,270 122,270 122,270 122,270 122,270 122,270 122,270
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 181,922 181,922 181,922 181,922 181,922 181,922 181,922
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 29,806 29,806 29,806 29,806 29,806 29,806 29,806
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 102,554 102,554 102,554 102,554 102,554 102,554 102,554
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 151,817 151,817 151,817 151,817 151,817 151,817 151,817
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,092 30,092 30,092 30,092 30,092 30,092 30,092
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 62,007 62,007 62,007 62,007 62,007 62,007 62,007
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 249,420 249,420 249,420 249,420 249,420 249,420 249,420
1.32 UNIÓN REPARACION PVC 4" UN ### 72,320 72,320 72,320 72,320 72,320 72,320 72,320
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 290,142 290,142 290,142 290,142 290,142 290,142 290,142
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 174,331 174,331 174,331 174,331 174,331 174,331 174,331
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 495,155 495,155 495,155 495,155 495,155 495,155 495,155
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
1.36 VÁLVULA COMPUERTA ELÁSTICA 6"
i
UN ### 1,324,988 1,324,988 1,324,988 1,324,988 1,324,988 1,324,988 1,324,988
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 1,957,762 1,957,762 1,957,762 1,957,762 1,957,762 1,957,762 1,957,762
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,782 10,782 10,782 10,782 10,782 10,782 10,782
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,660 24,660 24,660 24,660 24,660 24,660 24,660
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 74,438 87,836 91,185 89,846 88,506 97,214 102,574
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 70,994 67,567 65,854 69,281 94,982 100,122 100,122
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 80,433 77,007 75,293 78,720 104,421 109,561 109,561
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 91,492 94,566 94,566 91,492 93,541 117,113 91,492
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 73,812 74,857 76,946 73,812 75,902 99,931 68,588
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 71,948 82,777 85,485 84,402 83,319 90,358 94,689

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 113,711 113,711 113,711 113,711 113,711 113,711 113,711
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,184,788 1,184,788 1,184,788 1,184,788 1,184,788 1,184,788 1,184,788
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 148,576 148,576 148,576 148,576 148,576 148,576 148,576
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,372,268 1,372,268 1,372,268 1,372,268 1,372,268 1,372,268 1,372,268
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 956,522 956,522 956,522 956,522 956,522 956,522 956,522
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,536 62,536 62,536 62,536 62,536 62,536 62,536
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 112,880 112,880 112,880 112,880 112,880 112,880 112,880
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 266,458 266,458 266,458 266,458 266,458 266,458 266,458
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 266,452 266,452 266,452 266,452 266,452 266,452 266,452
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 427,740 427,740 427,740 427,740 427,740 427,740 427,740
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 112,928 112,928 112,928 112,928 112,928 112,928 112,928
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 112,928 112,928 112,928 112,928 112,928 112,928 112,928
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 266,458 266,458 266,458 266,458 266,458 266,458 266,458
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 266,458 266,458 266,458 266,458 266,458 266,458 266,458
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 427,740 427,740 427,740 427,740 427,740 427,740 427,740
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 430,333 430,333 430,333 430,333 430,333 430,333 430,333
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 698,145 698,145 698,145 698,145 698,145 698,145 698,145
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,120,274 1,120,274 1,120,274 1,120,274 1,120,274 1,120,274 1,120,274
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 69,240 69,240 69,240 69,240 69,240 69,240 69,240
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 360,259 360,259 360,259 360,259 360,259 360,259 360,259
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 403,123 403,123 403,123 403,123 403,123 403,123 403,123
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,116,159 1,116,159 1,116,159 1,116,159 1,116,159 1,116,159 1,116,159
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 65,101 65,212 65,240 65,229 65,218 65,290 65,335
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 326,679 326,679 326,679 326,679 326,679 326,679 326,679
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 49,653 49,653 49,653 49,653 49,653 49,653 49,653
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 70,190 70,190 70,190 70,190 70,190 70,190 70,190
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 101,252 101,252 101,252 101,252 101,252 101,252 101,252
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 155,407 155,407 155,407 155,407 155,407 155,407 155,407
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 249,691 249,691 249,691 249,691 249,691 249,691 249,691
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 362,768 362,768 362,768 362,768 362,768 362,768 362,768
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 458,931 458,931 458,931 458,931 458,931 458,931 458,931
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 603,367 603,367 603,367 603,367 603,367 603,367 603,367
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 829,628 829,628 829,628 829,628 829,628 829,628 829,628

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO)
UN ### 656,654 667,407 670,095 669,020 667,945 674,933 679,235
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE
4.2 INTERNO E=1.5CM Y CAÑUELA)
ML ### 643,830 651,474 653,385 652,621 651,857 656,825 659,883
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.3 (INCLUYE ARO Y TAPA HF) UN ### 702,386 709,555 711,347 710,630 709,913 714,572 717,440
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4.4 REFUERZO) UN ### 778,931 792,371 795,731 794,387 793,043 801,779 807,156
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE
4.5 INTERNO E=1.5CM Y CAÑUELA) ML ### 913,345 924,109 926,800 925,724 924,648 931,644 935,950
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.6 (INCLUYE ARO Y TAPA HF)
UN ### 809,371 819,227 821,691 820,706 819,720 826,127 830,070
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 985,859 990,791 992,025 991,533 991,037 994,242 996,218
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,422,289 1,436,973 1,440,646 1,439,180 1,437,707 1,447,251 1,453,131
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,938,016 1,966,456 1,973,567 1,970,722 1,967,878 1,986,364 1,997,741
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,567,450 2,614,724 2,626,544 2,621,815 2,617,089 2,647,817 2,666,728
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,818,423 1,818,423 1,818,423 1,818,423 1,818,423 1,818,423 1,818,423
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,843,393 3,843,393 3,843,393 3,843,393 3,843,393 3,843,393 3,843,393
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 138,073 138,385 138,463 138,432 138,401 138,603 138,728

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 71,612 72,195 72,341 72,283 72,224 72,603 72,837
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 84,976 85,559 85,705 85,647 85,588 85,967 86,201
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 53,957 55,872 56,351 56,159 55,968 57,213 57,979
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###
i 58,681 60,563 61,034 60,845 60,657 61,880 62,633
p
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### i 58,870 60,691 61,146 60,964 60,782 61,965 62,693
5.6 BORDE SEPARADOR VERDE A-170 ML ### o 251,062 251,374 251,452 251,420 251,389 251,592 251,717
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,186 18,415 18,473 18,450 18,427 18,576 18,668
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 38,649 39,999 40,336 40,201 40,066 40,943 41,483
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 82,699 82,865 82,907 82,890 82,874 82,982 83,049
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 550,514 554,754 555,814 555,390 554,966 557,722 559,418
5.11 LOSETA PREFABRICADA A-40 M2 ### 61,886 62,600 62,778 62,707 62,635 63,100 63,385
5.12 LOSETA PREFABRICADA A-60 M2 ### 89,665 90,379 90,557 90,486 90,414 90,878 91,164
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 32,590 33,343 33,531 33,456 33,381 33,870 34,171

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 52,124 53,648 54,029 53,876 53,724 54,714 55,323
5.15 SARDINEL PREFABRICADO A-10 ML ### 96,982 97,149 97,190 101,552 97,157 97,266 101,710
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 59,649 60,081 60,189 60,146 60,102 60,383 60,556

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 200,343 201,239 201,463 201,373 201,284 201,866 202,225
6.2 BANCA EN CONCRETO M-30 UN ### 658,308 659,563 659,876 659,751 659,625 660,441 660,942
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 212,584 212,771 212,818 212,799 212,781 212,902 212,977
6.4 BOLARDO M-60 CONCRETO UN ### 159,740 160,816 161,084 160,977 160,869 161,568 161,998
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 161,608 162,683 162,952 162,844 162,737 163,436 163,866
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 189,407 190,533 190,814 190,702 190,589 191,321 191,771
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 57,569 58,015 58,127 58,082 58,038 58,328 58,506
6.8 BORDILLO PREFABRICADO A-80 ML ### 66,310 66,810 66,935 66,885 66,835 67,160 67,360
6.9 CANECA M-120 UN ### 308,096 308,207 308,235 308,224 308,213 308,286 308,330
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 812,887 813,425 813,559 813,506 813,452 813,801 814,016
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,333,795 3,334,153 3,334,243 3,334,207 3,334,171 3,334,404 3,334,548
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,429,497 3,429,855 3,429,945 3,429,909 3,429,873 3,430,106 3,430,250
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 479,398 479,773 479,867 479,829 479,792 480,035 480,186
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 634,313 635,814 636,189 636,039 635,889 636,864 637,465
6.15 BANCA EN MADERA M-50 UN ### 528,019 528,019 528,019 528,019 528,019 528,019 528,019
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 245,034 245,571 245,706 245,652 245,598 245,948 246,163
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 567,589 567,868 567,938 567,910 567,882 568,063 568,175
6.18 POSTE HISTÓRICO M-131 UN ### 6,335,674 6,338,362 6,339,034 6,338,765 6,338,496 6,340,243 6,341,319

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,984 3,984 3,984 3,984 3,984 3,984 3,984
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ###
i 42,924 42,924 42,924 42,924 42,924 42,924 42,924
p
7.3 SEÑAL DOBLE DE CICLORUTA UN ### i 309,753 309,909 309,948 309,932 309,916 310,018 310,080
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### o 487,812 488,562 488,750 488,675 488,600 489,087 489,388
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 232,451 232,607 232,646 232,630 232,615 232,716 232,778
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 246,810 246,966 247,005 246,989 246,974 247,075 247,137
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 257,683 257,839 257,878 257,862 257,847 257,948 258,010
7.8 TACHAS REFLECTIVAS UN ### 13,402 13,402 13,402 13,402 13,402 13,402 13,402
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,309 14,309 14,309 14,309 14,309 14,309 14,309
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 116,278 116,278 116,278 116,278 116,278 116,278 116,278
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS
M3 ### 9,548 9,548 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,184 35,184 35,184 35,184 35,184 35,184 35,184
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENT M2 ### 481 481 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832 12,832 12,832 12,832

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES


2.9 600.1 A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 20,948 20,948 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 64,795 64,795 64,795 64,795 64,795 64,795 64,795
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 79,569 79,569 79,569 79,569 79,569 79,569 79,569
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE
2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,035 19,035 19,035 19,035 19,035 19,035 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE
2.13 600.4 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 39,738 39,738 39,738 39,738 39,738 39,738 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE
2.14 600.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 31,203 31,203 31,203 31,203 31,203 31,203 31,203
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO
2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 53,644 53,644 53,644 53,644 53,644 53,644 53,644
i
o
3 NORMA INV ESTRUCTURA DE PAVIMENTO
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366 5,366 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 135,927 135,927 135,927 173,622 135,927 135,927 173,622
3.3 330.1 BASE GRANULAR M3 ### 141,656 141,656 141,656 179,351 141,656 141,656 179,351
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,180 3,180 3,180 3,180 3,180 3,180 3,180
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,111 1,111 1,111 1,111 1,111 1,111 1,111
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA
3.7 461.1 M3 ### 219,662 223,272 224,175 223,814 223,453 225,799 227,243
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 65,084 66,172 66,444 66,335 66,226 66,933 67,368
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO) M3 ### 573,674 544,019 608,272 611,567 601,682 626,394 632,984
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3.10 450.2 P ASFÁLTICO) M3 ### 638,924 609,269 673,522 676,817 666,932 691,644 698,234
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3.11 450.9 P ASFÁLTICO)
M3 ### 675,294 645,639 709,891 713,186 703,301 728,014 734,604
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3.12 450.3 P ASFÁLTICO) M3 ### 660,674 631,019 695,272 698,567 688,682 713,394 719,984
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 401,170 390,930 402,657 417,397 421,660 439,197 441,198
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 287,181 287,181 287,181 324,876 287,181 287,181 324,876
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 280,413 280,413 280,413 318,107 280,413 280,413 318,107
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 37,999 37,999 37,999 37,999 37,999 37,999 37,999
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 168,334 168,334 168,334 168,334 168,334 168,334 168,334
3.15 311.1 AFIRMADO M3 ### 75,374 71,947 70,233 73,660 99,361 104,501 104,501
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,371 11,626 11,690 11,664 11,639 11,805 11,907
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,550 4,678 4,710 4,697 4,684 4,767 4,818
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 615,194 632,167 636,411 634,713 633,016 644,049 650,839
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE
3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 646,173 663,907 668,340 666,567 664,793 676,320 683,414
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE
3.20 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 666,739 684,967 689,524 687,701 685,878 697,726 705,017
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,003 7,003 7,003 7,003 7,003 7,003 7,003
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 102,568 104,018 106,917 102,568 105,467 138,813 95,319
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
p
4 NORMA INV OBRAS DE ARTE i
4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### o 887,621 906,875 911,688 909,763 907,838 920,352 928,054
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 762,161 781,096 785,829 783,936 782,043 794,350 801,924
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 807,552 827,237 832,158 830,189 828,222 841,016 848,890
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 547,462 564,969 569,347 567,595 565,845 577,225 584,228
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 642,742 660,943 665,494 663,673 661,853 673,684 680,964
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 545,644 563,744 568,269 566,459 564,649 576,414 583,654
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 640,852 659,669 664,373 662,492 660,610 672,840 680,368
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 704,675 722,775 727,300 725,490 723,680 735,445 742,685
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 564,290 583,107 587,811 585,929 584,047 596,278 603,805
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 747,790 766,607 771,311 769,429 767,547 779,778 787,305
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P ACERO A-36 KG ### 11,817 11,817 11,817 11,817 11,817 11,817 11,817
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.12 650 P ACERO A-588 GRADO B KG ### 15,130 15,130 15,130 15,130 15,130 15,130 15,130
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,778 1,778 1,778 1,778 1,778 1,778 1,778
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,662,462 2,662,462 2,662,462 2,662,462 2,662,462 2,662,462 2,662,462
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN
4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,066,593 4,099,527 4,107,762 4,104,467 4,101,174 4,122,582 4,135,756
REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4.16 621.2 REFUERZO) M3 ### 1,695,467 1,713,388 1,717,868 1,716,076 1,714,284 1,725,932 1,733,101

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###


U(DM3) 86,087 86,087 86,087 86,087 86,087 86,087 86,087
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 355,073 357,224 357,761 357,546 357,331 358,729 359,589
4.19 632 P BARANDA METÁLICA ML ### 419,091 419,091 419,091 419,091 419,091 419,091 419,091
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,733 16,733 16,733 16,733 16,733 16,733 16,733
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 462,496 479,176 482,818 483,048 496,986 512,361 519,876
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 106,835 111,185 111,185 106,835 109,735 143,080 106,835
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 76,227 73,064 71,482 74,646 98,370 103,114 103,114
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 359,194 378,143 382,880 380,985 379,090 391,406 398,986
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 353,659 365,443 369,311 366,604 366,533 385,975 374,662
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 362,302 374,086 377,954 375,247 375,176 394,618 383,305
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 367,402 378,874 382,664 379,988 379,948 399,188 387,750
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 376,045 387,517 391,307 388,631 388,591 407,831 396,393
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 494,608 513,031 517,637 515,795 513,952 525,927 533,297
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ###
i 588,016 607,169 611,957 610,042 608,127 620,576 628,238
p
4.31 681.1 GAVIÓN M3 ### i 189,118 190,502 193,270 189,118 191,886 223,716 182,199
4.32 681.1 GAVIÓN MALLA PVC M3 ### o 193,217 194,601 197,368 193,217 195,985 227,814 186,297
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500
4.33 672.1 PSI ML ### 40,875 42,006 42,289 42,176 42,063 42,798 43,250
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,
4.34 672.1 2500 PSI ML ### 15,602 16,167 16,309 16,252 16,196 16,563 16,789
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
4.35 *** (RESISTENCIA ÚLTIMA 25 KN) M2 ### 9,997 9,997 9,997 9,997 9,997 9,997 9,997

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,227 14,227 14,227 14,227 14,227 14,227 14,227
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,128 19,128 19,128 19,128 19,128 19,128 19,128
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 22,917 22,917 22,917 22,917 22,917 22,917 22,917
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 29,432 29,432 29,432 29,432 29,432 29,432 29,432
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,
4.40 *** FILTRO Y SEPARACIÓN) M2 ### 7,175 7,175 7,175 7,175 7,175 7,175 7,175

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,


4.41 *** FILTRO Y SEPARACIÓN) M2 ### 8,169 8,169 8,169 8,169 8,169 8,169 8,169

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN,


4.42 *** FILTRO Y SEPARACIÓN) M2 ### 8,489 8,489 8,489 8,489 8,489 8,489 8,489
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,
4.43 *** FILTRO Y SEPARACIÓN) M2 ### 6,061 6,061 6,061 6,061 6,061 6,061 6,061
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,
4.44 *** FILTRO Y SEPARACIÓN)
M2 ### 9,105 9,105 9,105 9,105 9,105 9,105 9,105
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,
4.45 *** FILTRO Y SEPARACIÓN) M2 ### 7,433 7,433 7,433 7,433 7,433 7,433 7,433
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN,
4.46 *** FILTRO Y SEPARACIÓN) M2 ### 9,105 9,105 9,105 9,105 9,105 9,105 9,105

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN,


4.47 *** FILTRO Y SEPARACIÓN) M2 ### 17,455 17,455 17,455 17,455 17,455 17,455 17,455

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO


4.48 661.1 Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### 621,389 621,631 621,692 621,667 621,643 621,801 621,898
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO
4.49 660.3 600 MM ML ### 352,577 356,641 357,657 357,250 356,844 359,486 361,111
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,
4.50 *** DIÁMETRO 36" ML ### 869,466 869,466 869,466 869,466 869,466 869,466 869,466
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 144,313 141,018 139,370 142,665 167,378 172,320 172,320
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez
i
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### p 4,369 4,369 4,369 4,369 4,369 4,369 4,369
i
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E ML ###
o 84,608 84,608 84,608 84,608 84,608 84,608 84,608
INSTALACIÓN)
GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4.54 *** INSTALACIÓN) ML ### 128,885 128,885 128,885 128,885 128,885 128,885 128,885
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 502,230 521,383 526,171 524,256 522,341 534,790 542,452
4.56 682.1 P COLCHONETA RENO M3 ### 204,967 206,351 209,119 204,967 207,735 239,565 198,048
4.57 *** TRINCHO EN MADERA M2 ### 66,975 66,975 66,975 66,975 66,975 66,975 66,975

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,984 3,984 3,984 3,984 3,984 3,984 3,984
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,924 42,924 42,924 42,924 42,924 42,924 42,924
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 82,535 82,535 82,535 82,535 82,535 82,535 82,535
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 68,679 68,679 68,679 68,679 68,679 68,679 68,679
5.5 730.1 DEFENSA METÁLICA ML ### 145,289 146,159 146,377 146,290 146,203 146,769 147,117
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES UN ### 13,402 13,402 13,402 13,402 13,402 13,402 13,402

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 835 835 835 835 835 835 835
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36",
6.2 801.6 INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN ### 131,984 131,984 131,984 131,984 131,984 131,984 131,984
DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE
6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM ML ### 25,566 25,566 25,566 25,566 25,566 25,566 25,566
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,310 8,310 8,310 8,310 8,310 8,310 8,310

6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890 448,890 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,277 15,277 15,277 15,277 15,277 15,277 15,277
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,676 24,676 24,676 24,676 24,676 24,676 24,676
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,418 9,418 9,418 9,418 9,418 9,418 9,418

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
CONSTRUCCIÓN

1,998,735 1,990,904 2,006,565


1,165,517 1,161,602 1,169,432
14,088 14,088 14,088
15,792 15,792 15,792
18,267 18,267 18,267
65,237 65,237 65,237
45,944 45,859 46,028
21,373 21,289 21,458
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
10,480 10,480 10,480
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
898,695 896,258 898,743
10,350 10,350 10,350
3,730 3,730 3,730
2,667,413 2,667,413 2,667,413
247,061 247,061 247,061
9,189 9,189 9,189

112,882 85,468 99,175


186,899 180,864 192,935
297,878 297,878 297,878
207,425 207,425 207,425
22,011 22,011 22,011
645,373 637,067 653,679
647,355 638,773 655,935
603,156 595,121 611,190
49,622 49,622 49,622
153,026 153,026 153,026

190,676 190,676 190,676

236,206 236,206 236,206

297,497 297,497 297,497


105,004 104,422 105,586
129,601 128,757 130,445
589,007 580,972 597,041
91,553 91,553 91,553

38,112 38,075 38,150


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
196,663 196,625 196,700
464,675 448,291 461,239
226,362 224,238 226,815
258,951 255,525 259,750
340,595 335,997 342,566
104,546 104,387 104,467
1,275,196 1,273,604 1,274,400
114,265 113,851 114,679
72,086 71,867 72,304
28,013 27,863 28,163
44,902 44,752 45,052
58,920 58,710 59,130
80,511 80,271 80,751
111,116 110,906 111,326
954,905 952,505 957,305

1,351,909 1,347,108 1,356,709

1,766,470 1,756,868 1,776,070

41,994 41,994 41,994


55,402 55,402 55,402
808,649 800,614 816,683
252,900 248,007 263,644
98,453 97,673 99,233

116,088 115,152 117,024

129,963 128,715 131,211

137,125 135,799 138,451

157,148 155,510 158,786

174,802 172,930 176,674


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

194,018 191,912 196,124


99,140 99,006 99,275
955,738 947,703 963,772
94,796 94,688 94,904
79,574 78,771 80,378
89,535 88,552 90,518
104,371 103,138 105,603
708,494 700,459 716,528

49,433 49,187 49,679

282,704 279,115 286,292


4,165 4,165 4,165
4,369 4,369 4,369
6,143 6,143 6,143
855,332 847,296 863,366
780,135 771,340 788,928
849,192 841,157 857,226
829,109 821,074 837,143
1,039,536 1,031,501 1,047,570
327,295 318,333 336,256

29,705 29,503 29,907


50,078 49,876 50,280
34,951 34,913 34,988
163,691 163,616 163,766
44,228 43,982 44,474
27,160 27,052 27,268
98,561 98,412 98,711
91,119 90,298 91,939
91,183 91,183 91,183
53,515 53,515 53,515
87,825 87,825 87,825
51,836 51,836 51,836
101,774 101,774 101,774
60,132 60,132 60,132
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
113,168 113,168 113,168
65,829 65,829 65,829
40,538 40,463 40,614
24,583 24,545 24,621
52,835 52,785 52,886
31,797 31,772 31,822
59,451 59,401 59,502
35,778 35,753 35,803
98,567 98,315 98,818
58,362 58,237 58,488
37,196 37,145 37,246
22,579 22,554 22,604
73,951 73,851 74,052
44,637 44,587 44,687
87,847 87,739 87,955
53,262 53,208 53,316
181,031 180,679 181,382
108,909 108,734 109,085
90,124 89,899 90,349
54,400 54,288 54,513
46,663 46,550 46,775
28,430 28,374 28,486
33,692 33,642 33,742
20,552 20,527 20,577
50,814 50,713 50,914
31,188 31,137 31,238
98,051 97,900 98,202
59,774 59,698 59,849
71,630 71,529 71,730
43,296 43,245 43,346
150,353 150,002 150,705
91,567 91,391 91,743
31,680 31,643 31,718
36,712 36,550 36,874
61,887 61,671 62,103
5,245 5,245 5,245
50,439 50,237 50,640
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
10,600 10,600 10,600
13,962 13,962 13,962
18,232 18,232 18,232
25,448 25,448 25,448
37,847 37,847 37,847
4,958 4,898 5,019

16,136 16,136 16,136


5,691 5,653 5,728
6,876 6,839 6,914
8,150 8,112 8,187
6,813 6,813 6,813
13,678 13,678 13,678
24,607 24,450 24,765
14,898 14,819 14,977
20,932 20,826 21,037
12,750 12,697 12,803
20,716 20,559 20,874
12,642 12,563 12,721
20,932 20,826 21,037
12,750 12,697 12,803
21,800 21,688 21,912
13,183 13,127 13,239
17,430 17,350 17,511
10,711 10,670 10,751
17,266 17,146 17,386
10,628 10,568 10,689
21,710 21,605 21,816
13,119 13,066 13,172
21,495 21,337 21,652
13,011 12,932 13,090
17,877 17,756 17,997
10,916 10,856 10,976
22,384 22,226 22,542
13,860 13,781 13,939
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

26,567 26,417 26,718


83,052 82,642 83,462
55,101 55,101 55,101
22,063 22,063 22,063
34,607 34,607 34,607
80,424 80,424 80,424
63,043 63,043 63,043
36,795 36,795 36,795
84,273 84,273 84,273
100,568 100,568 100,568
147,651 147,651 147,651
58,557 58,557 58,557
81,490 81,490 81,490
74,141 74,141 74,141
131,054 131,054 131,054
76,466 76,466 76,466
56,237 56,237 56,237
32,291 32,291 32,291
58,956 58,769 59,144
46,872 46,872 46,872
42,987 42,987 42,987
36,454 36,454 36,454
35,677 35,677 35,677
35,944 35,944 35,944
50,430 50,430 50,430
44,376 44,376 44,376
80,992 80,992 80,992

149,274 149,274 149,274

67,210 67,210 67,210


42,592 42,592 42,592
33,300 33,300 33,300
57,762 57,762 57,762
20,046 20,046 20,046
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
24,053 24,053 24,053
26,014 26,014 26,014
33,410 33,410 33,410
22,134 22,134 22,134
52,069 52,069 52,069
353,091 353,091 353,091
409,169 409,169 409,169
269,418 269,418 269,418
287,538 287,538 287,538

455,813 447,376 464,249


399,142 391,341 406,942
397,987 389,923 406,051
353,342 345,134 361,550
331,009 322,566 339,451
302,651 293,950 311,351
230,676 225,504 235,850
440,894 435,872 445,918
430,633 423,127 438,139
490,085 483,065 497,105
714,005 706,985 721,025

122,736 122,736 122,736


3,909 3,872 3,947
137,566 137,566 137,566
168,219 168,219 168,219
243,574 243,574 243,574
271,046 271,046 271,046
298,550 298,550 298,550
198,132 198,132 198,132
224,575 224,575 224,575
330,346 330,346 330,346
125,414 125,414 125,414
166,401 166,401 166,401
184,911 184,911 184,911
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
470,494 470,494 470,494
42,014 42,014 42,014
26,297 26,297 26,297
99,346 99,346 99,346
120,444 120,444 120,444
93,604 93,604 93,604
29,136 29,136 29,136
29,136 29,136 29,136
27,629 27,629 27,629
42,302 42,302 42,302
52,317 52,317 52,317
63,001 63,001 63,001
75,687 75,687 75,687
355,631 355,631 355,631
248,802 248,802 248,802
33,622 33,622 33,622
42,970 42,970 42,970
52,317 52,317 52,317
65,672 65,672 65,672

75,873 75,873 75,873


210,157 210,157 210,157
80,468 80,468 80,468
144,502 144,502 144,502
136,277 136,277 136,277
89,483 89,483 89,483
210,628 210,628 210,628
109,871 109,871 109,871
6,601 6,601 6,601
99,743 99,743 99,743

120,530 120,530 120,530


41,054 41,054 41,054

535,497 535,497 535,497


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
192,886 192,886 192,886
217,016 217,016 217,016

488,603 488,603 488,603

128,544 128,544 128,544


390,356 390,356 390,356
6,027 6,027 6,027
274,896 274,896 274,896
122,260 122,260 122,260
85,960 85,960 85,960
88,817 88,817 88,817

10,589 10,589 10,589

11,735 11,735 11,735

9,355 9,355 9,355

221,230 221,230 221,230


266,345 266,345 266,345
22,063 22,063 22,063
34,607 34,607 34,607
33,258 33,258 33,258
42,584 42,584 42,584
87,646 87,646 87,646
222,576 222,576 222,576
44,278 44,278 44,278
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
35,098 35,098 35,098
66,942 66,942 66,942
99,975 99,975 99,975
84,191 84,191 84,191
61,663 61,663 61,663
65,533 65,533 65,533
82,798 82,798 82,798
66,573 66,573 66,573
83,091 83,091 83,091
88,815 88,815 88,815
73,387 73,387 73,387
12,458 12,458 12,458
17,501 17,501 17,501
22,858 22,858 22,858
14,144 14,144 14,144
8,467 8,467 8,467
50,815 50,815 50,815
32,539 32,539 32,539
10,590 10,590 10,590
25,172 25,172 25,172
34,893 34,893 34,893
47,330 47,330 47,330
88,258 88,258 88,258
107,379 107,379 107,379
59,895 59,895 59,895
76,183 76,183 76,183
183,799 183,799 183,799
378,656 378,656 378,656
279,913 279,913 279,913
17,573 17,573 17,573
22,169 22,169 22,169
172,393 172,393 172,393

280,276 280,276 280,276

466,160 466,160 466,160


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

40,312 40,312 40,312

47,520 47,520 47,520

61,119 61,119 61,119

69,164 69,164 69,164

89,101 89,101 89,101

103,456 103,456 103,456

153,112 153,112 153,112


61,786 61,786 61,786
62,036 62,036 62,036
39,900 39,900 39,900
49,102 49,102 49,102

4,152 4,152 4,152

6,535 6,535 6,535

1,010,813 1,010,813 1,010,813


773,091 773,091 773,091
2,589,429 2,589,429 2,589,429
2,159,383 2,159,383 2,159,383
629,188 629,188 629,188
813,231 813,231 813,231
312,125 312,125 312,125

362,010 362,010 362,010


57,515 57,515 57,515
68,043 68,043 68,043
75,599 75,599 75,599
88,985 88,985 88,985
54,094 54,094 54,094
61,641 61,641 61,641
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
142,598 142,598 142,598
55,532 55,532 55,532
127,555 127,555 127,555
76,332 76,332 76,332
45,257 45,257 45,257
95,522 95,522 95,522
407,996 407,996 407,996
543,161 543,161 543,161
3,516 3,516 3,516
4,644 4,644 4,644
7,221 7,221 7,221
12,920 12,920 12,920
271,336 271,336 271,336
76,760 76,760 76,760
103,755 103,755 103,755
42,606 42,606 42,606
1,393,269 1,393,269 1,393,269
1,032,687 1,032,687 1,032,687
1,286,640 1,286,640 1,286,640
597,865 597,865 597,865
109,495 109,495 109,495
501,512 501,512 501,512
627,282 627,282 627,282
1,655,849 1,655,849 1,655,849
1,219,541 1,219,541 1,219,541

40,364 40,094 40,634


39,971 39,701 40,241
14,887 14,833 14,941
29,253 28,713 29,793
85,976 85,436 86,516
26,868 26,699 27,037
58,064 57,243 58,884
80,478 79,165 81,791
30,365 30,365 30,365
23,071 23,071 23,071
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
27,110 27,110 27,110
47,260 46,521 47,999
55,368 54,466 56,271
80,229 78,834 81,625
105,427 99,246 111,607
113,633 101,984 115,729

57,590 57,482 57,698


34,466 34,412 34,520
66,157 65,887 66,427
69,457 69,187 69,727
73,737 73,467 74,007
75,702 75,594 75,810
37,775 37,664 37,887
165,233 164,747 165,719
47,294 47,017 47,571
44,198 44,198 44,198
10,461 10,350 10,573
9,385 9,385 9,385
12,587 12,587 12,587
10,588 10,588 10,588
17,668 17,668 17,668
34,327 34,327 34,327
9,333 9,333 9,333
74,724 74,724 74,724
120,057 119,679 120,435
7,646 7,646 7,646
32,168 32,093 32,243
45,983 45,983 45,983
53,393 53,393 53,393
49,479 49,479 49,479
50,018 49,910 50,126
56,065 55,957 56,173
11,054 11,054 11,054
49,606 49,494 49,719
20,671 20,671 20,671
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

123,526 123,526 123,526


10,052 10,052 10,052
22,590 22,590 22,590
14,548 14,548 14,548
14,138 14,138 14,138
8,651 8,651 8,651
8,801 8,801 8,801
19,162 19,162 19,162
17,476 17,476 17,476
18,642 18,642 18,642

21,551 21,551 21,551


65,657 65,549 65,765
77,468 77,468 77,468
34,601 34,601 34,601
13,345 13,345 13,345
101,598 101,598 101,598
123,110 123,110 123,110

72,806 72,806 72,806


36,314 36,314 36,314
55,738 55,738 55,738
68,287 68,287 68,287
51,011 51,011 51,011
94,378 94,378 94,378
48,840 48,840 48,840
104,217 104,217 104,217
13,583 13,583 13,583

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

43,707 43,707 43,707

49,987 49,987 49,987

85,005 85,005 85,005

19,114 19,114 19,114


103,443 76,028 89,736
108,457 102,141 114,773
182,381 182,381 165,247
102,788 75,374 89,081
173,622 173,622 156,488
179,351 179,351 162,217

302,096 302,096 302,096

888,820 888,820 888,820

481,963 481,963 481,963

140,487 140,487 140,487

196,192 196,192 196,192

182,270 182,270 182,270


400,122 400,122 400,122
1,022,014 1,022,014 1,022,014
290,913 290,913 290,913
206,462 206,462 206,462
82,675 82,675 82,675
249,662 249,662 249,662

367,333 367,333 367,333


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

8,382 8,382 8,382


3,100 3,100 3,100
11,198 11,198 11,198
42,377 42,377 42,377
5,868 5,868 5,868
65,580 65,580 65,580
3,495 3,495 3,495
2,785 2,785 2,785
14,003 14,003 14,003
4,052 4,052 4,052
14,763 14,763 14,763
5,750 5,750 5,750
6,549 6,549 6,549
7,066 7,066 7,066
4,428 4,428 4,428
15,595 15,595 15,595
9,676 9,676 9,676
22,909 22,909 22,909
2,701 2,701 2,701
12,192 12,192 12,192
3,291 3,291 3,291
12,649 12,649 12,649
7,117 7,117 7,117
4,479 4,479 4,479
21,851 21,851 21,851
12,751 12,751 12,751
7,885 7,885 7,885

6,047,507 6,047,507 6,047,507


10,685,026 10,685,026 10,685,026
2,796,384 2,796,384 2,796,384
9,138,531 9,138,531 9,138,531
8,557,471 8,557,471 8,557,471
2,701 2,701 2,701
858,721 858,721 858,721
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
85,733 85,733 85,733
1,553,256 1,553,172 1,553,341
676,540 674,524 678,556

29,386 29,386 29,386


43,618 43,618 43,618
54,061 54,061 54,061
17,656 17,656 17,656

21,377 21,377 21,377


29,132 29,132 29,132
26,155 26,155 26,155
27,570 27,570 27,570
34,459 34,459 34,459
17,624 17,624 17,624
23,092 23,092 23,092
35,497 35,497 35,497
271,925 271,925 271,925
312,927 312,927 312,927
326,412 326,412 326,412
302,948 302,948 302,948

221,143 221,143 221,143


33,863 33,863 33,863
103,345 103,345 103,345
263,277 263,277 263,277
52,033 52,033 52,033
572,190 572,190 572,190
1,416,949 1,416,949 1,416,949
45,107 45,107 45,107
221,087 221,087 221,087
44,064 44,064 44,064
3,759 3,759 3,759
6,301 6,301 6,301
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
18,715 18,715 18,715
24,509 24,509 24,509
31,801 31,801 31,801
122,537 122,537 122,537
31,975 31,975 31,975
104,462 104,462 104,462
184,141 184,141 184,141
288,590 288,590 288,590
358,844 358,844 358,844
391,898 391,898 391,898
575,030 575,030 575,030
339,061 339,061 339,061
103,864 103,864 103,864
13,817 13,817 13,817
28,229 28,229 28,229
5,005 5,005 5,005
35,319 35,319 35,319
36,894 36,894 36,894
37,682 37,682 37,682
24,582 24,582 24,582
27,173 27,173 27,173
28,261 28,261 28,261
47,401 47,401 47,401
612,516 612,516 612,516
314,943 314,943 314,943
88,765 88,765 88,765
1,839 1,839 1,839
8,486 8,486 8,486
12,634 12,634 12,634
21,069 21,069 21,069
3,912 3,912 3,912
22,458 22,458 22,458
32,621 32,621 32,621
19,415 19,415 19,415
15,383 15,383 15,383
617,371 617,371 617,371
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
URBANISMO

9,712 9,712 9,712


90,400 90,400 90,400
508,569 508,569 508,569
1,085,443 1,085,443 1,085,443
124,516 124,516 124,516
757,851 757,851 757,851
1,630,607 1,630,607 1,630,607
13,128 13,128 13,128
16,165 16,165 16,165
20,267 20,267 20,267
22,171 22,171 22,171
26,557 26,557 26,557
26,557 26,557 26,557
106,379 106,379 106,379
123,235 123,235 123,235
381,304 381,304 381,304
143,161 143,161 143,161
236,002 236,002 236,002
1,043,963 1,043,963 1,043,963
1,202,753 1,202,753 1,202,753
14,201 14,201 14,201
12,541 12,541 12,541
30,752 30,752 30,752
122,270 122,270 122,270
181,922 181,922 181,922
29,806 29,806 29,806
102,554 102,554 102,554
151,817 151,817 151,817
30,092 30,092 30,092
62,007 62,007 62,007
249,420 249,420 249,420
72,320 72,320 72,320
290,142 290,142 290,142
174,331 174,331 174,331
495,155 495,155 495,155
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
1,324,988 1,324,988 1,324,988
1,957,762 1,957,762 1,957,762

10,782 10,782 10,782


24,660 24,660 24,660
19,114 19,114 19,114
89,176 83,147 95,205
98,408 70,994 84,701
107,848 80,433 94,141
91,492 91,492 101,740
73,812 73,812 88,439
83,860 78,988 88,734

113,711 113,711 113,711


1,184,788 1,184,788 1,184,788
148,576 148,576 148,576
1,372,268 1,372,268 1,372,268
956,522 956,522 956,522
62,536 62,536 62,536
112,880 112,880 112,880
266,458 266,458 266,458
266,452 266,452 266,452
427,740 427,740 427,740
112,928 112,928 112,928
112,928 112,928 112,928
266,458 266,458 266,458
266,458 266,458 266,458
427,740 427,740 427,740
430,333 430,333 430,333
698,145 698,145 698,145
1,120,274 1,120,274 1,120,274
69,240 69,240 69,240
360,259 360,259 360,259
403,123 403,123 403,123
1,116,159 1,116,159 1,116,159
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
65,224 65,173 65,274
326,679 326,679 326,679
49,653 49,653 49,653
70,190 70,190 70,190
101,252 101,252 101,252
155,407 155,407 155,407
249,691 249,691 249,691
362,768 362,768 362,768
458,931 458,931 458,931
603,367 603,367 603,367
829,628 829,628 829,628

668,482 663,644 673,321

652,239 648,799 655,679

710,271 707,046 713,497

793,715 787,667 799,763

925,186 920,342 930,030

820,213 815,778 824,648


991,287 989,065 993,505
1,438,446 1,431,834 1,445,052
1,969,301 1,956,502 1,982,098
2,619,453 2,598,178 2,640,726
1,818,423 1,818,423 1,818,423
3,843,393 3,843,393 3,843,393
138,416 138,276 138,557

72,254 71,991 72,516


85,618 85,355 85,880
56,064 55,202 56,925
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
60,751 59,905 61,598
60,873 60,054 61,692
251,405 251,264 251,545
18,438 18,335 18,542
40,134 39,526 40,741
82,882 82,807 82,957
555,178 553,270 557,086
62,671 62,350 62,992
90,450 90,129 90,771
33,418 33,079 33,757

53,800 53,115 54,486


101,543 101,468 99,629
60,124 59,930 60,318

201,329 200,925 201,732


659,688 659,123 660,252
212,790 212,705 212,874
160,923 160,439 161,407
162,791 162,307 163,275
190,645 190,139 191,152
58,060 57,859 58,261
66,860 66,635 67,085
308,219 308,168 308,269
813,479 813,237 813,721
3,334,189 3,334,028 3,334,351
3,429,891 3,429,730 3,430,053
479,810 479,641 479,979
635,964 635,289 636,639
528,019 528,019 528,019
245,625 245,383 245,867
567,896 567,770 568,022
6,338,631 6,337,421 6,339,840

3,984 3,984 3,984


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
42,924 42,924 42,924
309,924 309,854 309,994
488,637 488,299 488,975
232,622 232,552 232,693
246,981 246,911 247,052
257,854 257,784 257,925
13,402 13,402 13,402
14,309 14,309 14,309
116,278 116,278 116,278
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
ECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548


35,184 35,184 35,184
8,749 8,749 8,749
14,967 14,967 14,967
13,068 13,068 13,068
7,499 7,499 7,499
481 481 481

12,832 12,832 12,832

20,948 20,948 20,948

64,795 64,795 64,795

79,569 79,569 79,569

19,035 19,035 19,035

39,738 39,738 39,738

31,203 31,203 31,203


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

53,644 53,644 53,644

5,366 5,366 5,366


173,622 173,622 156,488
179,351 179,351 162,217
139,125 139,125 139,125
3,180 3,180 3,180
1,111 1,111 1,111
223,633 222,009 225,258
66,280 65,791 66,770
604,977 595,092 563,789

670,227 660,342 629,039

706,596 696,711 665,409

691,977 682,092 650,789


423,815 409,182 407,967
324,876 324,876 307,742
318,107 318,107 300,973
37,999 37,999 37,999
168,334 168,334 168,334
102,788 75,374 89,081
11,652 11,537 11,766
4,690 4,633 4,748
633,865 626,227 641,503

665,680 657,700 673,660

686,790 678,587 694,992

7,003 7,003 7,003


102,568 102,568 122,865
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

908,800 900,136 917,464


782,989 774,468 791,510
829,205 820,347 838,063
566,721 558,842 574,599
662,764 654,572 670,954
565,554 557,409 573,699
661,551 653,084 670,018
724,585 716,440 732,730
584,988 576,521 593,455
768,488 760,021 776,955
11,817 11,817 11,817

15,130 15,130 15,130


1,778 1,778 1,778
2,662,462 2,662,462 2,662,462

4,102,822 4,088,000 4,117,642

1,715,180 1,707,116 1,723,244

86,087 86,087 86,087


357,439 356,471 358,406
419,091 419,091 419,091
16,733 16,733 16,733
500,034 474,709 500,053
106,835 106,835 121,333
101,533 76,227 88,880
380,037 371,510 388,564
366,041 360,976 378,487
374,684 369,619 387,130
379,441 374,516 391,747
388,084 383,159 400,390
514,874 506,583 523,164
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une
609,085 600,466 617,703
189,118 189,118 208,493
193,217 193,217 212,591
42,119 41,610 42,628

16,224 15,970 16,478

9,997 9,997 9,997

14,227 14,227 14,227


19,128 19,128 19,128
22,917 22,917 22,917

29,432 29,432 29,432

7,175 7,175 7,175

8,169 8,169 8,169

8,489 8,489 8,489

6,061 6,061 6,061

9,105 9,105 9,105

7,433 7,433 7,433

9,105 9,105 9,105

17,455 17,455 17,455

621,655 621,546 621,764

357,047 355,218 358,876

869,466 869,466 869,466


170,673 144,313 157,493
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE


Quetame Ubaque Une

4,369 4,369 4,369

84,608 84,608 84,608

128,885 128,885 128,885


523,298 514,680 531,917
204,967 204,967 224,342
66,975 66,975 66,975

3,984 3,984 3,984


42,924 42,924 42,924
82,535 82,535 82,535
68,679 68,679 68,679
146,246 145,855 146,638
13,402 13,402 13,402

835 835 835

131,984 131,984 131,984

25,566 25,566 25,566


8,310 8,310 8,310

448,890 448,890 448,890

1,804 1,804 1,804


15,277 15,277 15,277
24,676 24,676 24,676
9,418 9,418 9,418

E BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 2,228,288 2,265,345 2,191,230 2,254,365 2,233,778
1.2 CAMPAMENTO 9 M2 UN ### 1,287,558 1,306,087 1,269,029 1,300,597 1,290,303
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,900 14,900 14,900 14,900 14,900
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,711 16,711 16,711 16,711 16,711
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,286 19,286 19,286 19,286 19,286
1.6 CERCA EN TABLA H=2.30 M ML ### 71,697 71,697 71,697 71,697 71,697
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 50,967 51,367 50,567 51,249 51,026
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 23,772 24,173 23,372 24,054 23,832
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 996,064 999,351 993,071 999,170 995,652
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 11,281 11,281 11,281 11,281 11,281
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 4,094 4,094 4,094 4,094 4,094
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,954,012 2,954,012 2,954,012 2,954,012 2,954,012
1.44 RED TELEFÓNICA PROVISIONAL UN ### 270,723 270,723 270,723 270,723 270,723
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 154,036 168,282 147,183 143,756 130,049
2.2 BASE ARENA CEMENTO 1:20 M3 ### 248,108 276,363 219,852 267,991 252,294
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 24,180 24,180 24,180 24,180 24,180
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 757,026 796,388 717,664 784,726 762,858
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 760,435 801,130 719,740 789,073 766,464
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 706,882 744,987 668,777 733,697 712,528
2.9 PILOTE DE MADERA D=20 CM ML ### 50,706 50,706 50,706 50,706 50,706
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.10 MENOR DE 5 KM)
ML ### 156,545 156,545 156,545 156,545 156,545
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.11 MENOR DE 5 KM) ML ### 198,517 198,517 198,517 198,517 198,517
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 MENOR DE 5 KM) ML ### 249,275 249,275 249,275 249,275 249,275
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.13 MENOR DE 5 KM) ML ### 317,602 317,602 317,602 317,602 317,602
2.14 PILOTE HINCADO 25X25 ML ### 115,072 117,836 112,308 117,017 115,482
2.15 PILOTE HINCADO 30X30 ML ### 144,193 148,199 140,187 147,012 144,786
2.16 DADOS EN CONCRETO 3500PSI M3 ### 692,733 730,838 654,627 719,548 698,379
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.17 KM) ML ### 93,867 93,867 93,867 93,867 93,867

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 41,500 41,676 41,325 41,624 41,526
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
3.2 SIFÓN EN PVC 6" UN ###
i 218,656 218,831 218,480 218,779 218,682
p
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### i 501,473 510,300 495,081 514,264 495,320
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### o 247,309 251,473 243,350 250,794 247,297
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 286,089 293,077 279,424 291,878 286,135
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 383,901 396,332 371,793 393,521 384,754
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 107,922 107,851 108,023 107,951 107,822
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,416,868 1,416,151 1,417,878 1,417,156 1,415,863
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 126,339 128,278 124,399 127,703 126,626
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 80,394 81,418 79,371 81,114 80,546
3.11 TUBERÍA DRENAJE PVC 110 ML ### 31,329 32,035 30,624 31,826 31,434
3.12 TUBERÍA DRENAJE PVC 160 ML ### 50,154 50,859 49,449 50,650 50,258
3.13 TUBERÍA DRENAJE PVC 200 ML ### 66,142 67,130 65,155 66,837 66,288
3.14 TUBERÍA DRENAJE PVC 250 ML ### 90,482 91,610 89,353 91,276 90,649
3.15 TUBERÍA DRENAJE PVC 315 ML ### 124,618 125,606 123,631 125,313 124,765
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,076,712 1,087,998 1,065,426 1,084,654 1,078,384
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,538,784 1,561,356 1,516,212 1,554,668 1,542,128

3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 2,037,135 2,082,279 1,991,991 2,068,903 2,043,823

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 45,984 45,984 45,984 45,984 45,984
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 61,030 61,030 61,030 61,030 61,030
4.3 COLUMNAS 3500 PSI M3 ### 923,859 961,964 885,753 950,674 929,504
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 314,826 345,735 290,186 332,785 318,167
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI M2 ### 113,581 117,281 109,882 116,185 114,129
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI M2 ### 134,372 138,811 129,932 137,496 135,029
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 148,408 154,328 142,489 152,574 149,285
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 156,707 162,996 150,418 161,133 157,639
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 180,916 188,685 173,147 186,383 182,067
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 201,803 210,681 192,924 208,051 203,118
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 224,204 234,192 214,215 231,233 225,684
4.12 ENTREPISO VIGUETA PLACA M2 ### 109,112 109,753 108,470 109,563 109,207
4.13 ESCALERA MACIZA 3500 PSI M3 ### 1,085,696 1,123,800 1,047,590 1,112,511 1,091,341
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 105,279 105,798 104,761 105,644 105,356
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ###
i 91,304 95,115 87,494 93,986 91,869
p
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### i 103,537 108,199 98,876 106,818 104,228
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### o 121,535 127,380 115,689 125,648 122,401
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 815,864 853,969 777,758 842,679 821,510
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 53,663 54,832 52,494 54,486 53,836
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 328,997 346,014 311,978 340,972 331,518
4.21 ACERO FIGURADO 37000 PSI KG ### 4,602 4,602 4,602 4,602 4,602
4.22 ACERO FIGURADO 60000 PSI KG ### 4,827 4,827 4,827 4,827 4,827
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,608 6,608 6,608 6,608 6,608
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 965,731 1,003,836 927,625 992,546 971,377
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 895,476 937,184 853,767 924,826 901,655
4.26 VIGA AÉREA 3500 PSI M3 ### 961,059 999,163 922,953 987,874 966,704
4.27 VIGA CINTA 3500 PSI M3 ### 941,029 979,134 902,923 967,844 946,675
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,152,618 1,190,723 1,114,513 1,179,433 1,158,264
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 423,169 465,579 380,759 453,013 429,452

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 32,457 33,412 31,502 33,129 32,598
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 52,978 53,933 52,023 53,650 53,120
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 37,018 37,193 36,842 37,141 37,044
5.4 ARCOS EN LADRILLO PRENSADO ML ### 172,785 173,136 172,434 173,032 172,837
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 48,376 49,545 47,206 49,198 48,549
5.6 DINTELES EN BLOQUE 0.15 M ML ### 29,643 30,161 29,125 30,008 29,720
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 108,970 109,672 108,268 109,464 109,074
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 104,719 108,617 100,821 107,462 105,296
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 98,182 98,182 98,182 98,182 98,182
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 57,015 57,015 57,015 57,015 57,015
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 94,414 94,414 94,414 94,414 94,414
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 55,131 55,131 55,131 55,131 55,131
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 110,441 110,441 110,441 110,441 110,441
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 64,465 64,465 64,465 64,465 64,465
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 123,228 123,228 123,228 123,228 123,228
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 70,859 70,859 70,859 70,859 70,859
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 44,121 44,474 43,768 44,369 44,173
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 26,374 26,551 26,198 26,498 26,400
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 57,885 58,120 57,650 58,050 57,920
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 34,322 34,439 34,204 34,404 34,339
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ###
i 65,031 65,267 64,796 65,197 65,066
p
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### i 38,568 38,686 38,451 38,651 38,586
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### o 108,874 110,050 107,698 109,701 109,048
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 63,516 64,104 62,928 63,930 63,603
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 40,248 40,483 40,013 40,413 40,283
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 24,105 24,222 23,987 24,188 24,122
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 80,594 81,065 80,124 80,925 80,664
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 47,958 48,193 47,723 48,124 47,993
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 97,099 97,617 96,580 97,463 97,175
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 57,888 58,147 57,629 58,070 57,926
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 200,892 202,538 199,246 202,051 201,136
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 118,840 119,663 118,017 119,419 118,962
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 100,148 101,229 99,067 100,909 100,308
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 59,412 59,953 58,872 59,793 59,493
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 51,234 51,760 50,707 51,604 51,312
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 30,716 30,979 30,452 30,901 30,755
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 36,414 36,649 36,178 36,579 36,449
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,913 22,030 21,795 21,995 21,930
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 55,860 56,330 55,389 56,191 55,929
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 33,711 33,946 33,476 33,876 33,746
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 107,892 108,598 107,187 108,389 107,997
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 64,694 65,047 64,342 64,943 64,747
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 78,541 79,011 78,071 78,872 78,611
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 46,822 47,057 46,587 46,987 46,857
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 166,477 168,123 164,831 167,635 166,721
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 99,730 100,553 98,907 100,309 99,852
5.47 REMATES LADRILLO PRENSADO ML ### 34,171 34,346 33,995 34,294 34,197
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 40,755 41,533 39,978 41,302 40,870
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 68,180 69,217 67,144 68,910 68,334
5.50 LAVADA DE FACHADA M2 ### 5,316 5,316 5,316 5,316 5,316
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 53,356 54,311 52,401 54,028 53,498
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,740 10,740 10,740 10,740 10,740
5.53 ANCLAJE 3/8" L=30CM UN ### 14,397 14,397 14,397 14,397 14,397
5.54 ANCLAJE 1/2" L=50CM UN ### 18,874 18,874 18,874 18,874 18,874
5.55 ANCLAJE 5/8" L=70CM UN ### 26,758 26,758 26,758 26,758 26,758
5.56 ANCLAJE 3/4" L=70CM UN ### 40,356 40,356 40,356 40,356 40,356
5.57 ANCLAJE 1" L= 70CM UN ### 5,699 5,984 5,414 5,900 5,741
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
p
6 PAÑETES, REVOQUES Y REPELLOS i
6.1 ENTRAMADO MADERA CIELO RASO M2 ### o 16,537 16,537 16,537 16,537 16,537
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,132 6,308 5,957 6,256 6,158
6.3 FILOS O DILATACIONES S/MURO ML ### 7,318 7,494 7,143 7,442 7,344
6.4 GOTERA EN MORTERO 1:4 ML ### 8,707 8,882 8,531 8,830 8,733
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,360 7,360 7,360 7,360 7,360
6.6 MALLA BAJO ENTRAMADO M2 ### 14,209 14,209 14,209 14,209 14,209
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 26,627 27,384 25,870 27,159 26,739
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,907 16,286 15,529 16,174 15,964
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,534 23,028 22,040 22,882 22,607
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,551 13,798 13,304 13,725 13,588
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 22,736 23,493 21,979 23,268 22,848
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,652 14,030 13,274 13,918 13,708
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,534 23,028 22,040 22,882 22,607
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,551 13,798 13,304 13,725 13,588
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 23,834 24,373 23,295 24,214 23,914
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 14,200 14,469 13,930 14,390 14,240
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,651 19,028 18,275 18,916 18,707
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,321 11,509 11,133 11,453 11,349
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 18,805 19,381 18,228 19,211 18,890
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,398 11,686 11,110 11,601 11,441
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 23,313 23,806 22,819 23,660 23,386
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,920 14,167 13,673 14,094 13,957
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 23,514 24,271 22,758 24,047 23,626
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,021 14,399 13,643 14,287 14,077
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 19,415 19,992 18,839 19,821 19,501
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,685 11,973 11,397 11,888 11,728
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 24,404 25,160 23,647 24,936 24,516
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,870 15,248 14,492 15,136 14,926

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 28,857 29,562 28,151 29,353 28,961
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE) M2 ### 93,575 95,524 91,626 94,946 93,863
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 60,564 60,564 60,564 60,564 60,564
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,754 23,754 23,754 23,754 23,754
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ###
p 37,440 37,440 37,440 37,440 37,440
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### i 88,821 88,821 88,821 88,821 88,821
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### o 69,318 69,318 69,318 69,318 69,318
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 39,865 39,865 39,865 39,865 39,865
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 93,141 93,141 93,141 93,141 93,141
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 111,426 111,426 111,426 111,426 111,426
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 164,262 164,262 164,262 164,262 164,262
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 64,079 64,079 64,079 64,079 64,079
7.13 CANAL PVC AMAZONAS ML ### 88,594 88,594 88,594 88,594 88,594
7.14 CANAL PVC RAINGO ML ### 80,347 80,347 80,347 80,347 80,347
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 144,527 144,527 144,527 144,527 144,527
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 84,666 84,666 84,666 84,666 84,666
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 61,966 61,966 61,966 61,966 61,966
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 34,410 34,410 34,410 34,410 34,410
7.19 TEJA DE BARRO M2 ### 64,162 65,040 63,285 64,780 64,292
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 51,685 51,685 51,685 51,685 51,685
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 47,325 47,325 47,325 47,325 47,325
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 39,278 39,278 39,278 39,278 39,278
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 38,514 38,514 38,514 38,514 38,514
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 38,813 38,813 38,813 38,813 38,813
7.25 TEJA TERMOACÚSTICA M2 ### 55,164 55,164 55,164 55,164 55,164
7.26 TEJA PLÁSTICA No.6 M2 ### 48,370 48,370 48,370 48,370 48,370
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 89,256 89,256 89,256 89,256 89,256
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 165,731 165,731 165,731 165,731 165,731
7.29 TEJA SIN TRASLAPO M2 ### 74,160 74,160 74,160 74,160 74,160
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,945 44,945 44,945 44,945 44,945
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 35,467 35,467 35,467 35,467 35,467
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO
7.32 4"x2", 15 MM) M2 ### 62,916 62,916 62,916 62,916 62,916
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,054 21,054 21,054 21,054 21,054
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,550 25,550 25,550 25,550 25,550
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,850 27,850 27,850 27,850 27,850
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 36,150 36,150 36,150 36,150 36,150
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,593 23,593 23,593 23,593 23,593
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 55,692 55,692 55,692 55,692 55,692
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 394,720 394,720 394,720 394,720 394,720
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 430,967 430,967 430,967 430,967 430,967
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ###
i 295,938 295,938 295,938 295,938 295,938
p
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### i 317,335 317,335 317,335 317,335 317,335
o
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 566,222 606,282 526,162 594,413 572,157
8.2 CONCRETO 3500 PSI M3 ### 497,940 534,935 460,944 523,974 503,421
8.3 CONCRETO 3000 PSI M3 ### 497,206 535,422 458,991 524,099 502,868
8.4 CONCRETO 2500 PSI M3 ### 449,712 488,689 410,734 477,140 455,486
8.5 CONCRETO 2000 PSI M3 ### 426,067 466,097 386,036 454,236 431,997
8.6 CONCRETO 1500 PSI M3 ### 395,733 436,908 354,558 424,708 401,833
8.7 MORTERO SECO 1:10 M3 ### 289,328 313,547 265,109 306,371 292,916
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 517,202 540,719 493,685 533,751 520,686
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 526,803 562,832 490,775 552,157 532,141
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 589,879 623,575 556,183 613,591 594,871
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 841,139 874,835 807,443 864,851 846,131

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 133,817 133,817 133,817 133,817 133,817
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,460 4,635 4,284 4,583 4,486
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 148,895 148,895 148,895 148,895 148,895
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 183,292 183,292 183,292 183,292 183,292
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 270,065 270,065 270,065 270,065 270,065
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 300,813 300,813 300,813 300,813 300,813
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 331,594 331,594 331,594 331,594 331,594
9.8 HOJA PUERTA FORTEC 0.81 UN ### 220,741 220,741 220,741 220,741 220,741
9.9 HOJA PUERTA FORTEC 0.91 UN ### 250,414 250,414 250,414 250,414 250,414
9.10 HOJA PUERTA FORTEC 1.50 UN ### 369,106 369,106 369,106 369,106 369,106
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 139,141 139,141 139,141 139,141 139,141
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 185,134 185,134 185,134 185,134 185,134
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 205,905 205,905 205,905 205,905 205,905
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 526,371 526,371 526,371 526,371 526,371
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 45,434 45,434 45,434 45,434 45,434
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,798 27,798 27,798 27,798 27,798
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 107,333 107,333 107,333 107,333 107,333
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 134,326 134,326 134,326 134,326 134,326
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 104,208 104,208 104,208 104,208 104,208
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 31,865 31,865 31,865 31,865 31,865
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ###
i 31,865 31,865 31,865 31,865 31,865
p
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### i 30,174 30,174 30,174 30,174 30,174
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### o 45,973 45,973 45,973 45,973 45,973
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 57,211 57,211 57,211 57,211 57,211
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 69,198 69,198 69,198 69,198 69,198
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 83,434 83,434 83,434 83,434 83,434
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 396,409 396,409 396,409 396,409 396,409
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 276,531 276,531 276,531 276,531 276,531
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 36,232 36,232 36,232 36,232 36,232
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 46,722 46,722 46,722 46,722 46,722
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 57,211 57,211 57,211 57,211 57,211
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 72,196 72,196 72,196 72,196 72,196

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 82,404 82,404 82,404 82,404 82,404
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 233,089 233,089 233,089 233,089 233,089
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 86,645 86,645 86,645 86,645 86,645
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 153,027 153,027 153,027 153,027 153,027
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 147,445 147,445 147,445 147,445 147,445
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 96,763 96,763 96,763 96,763 96,763
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 229,152 229,152 229,152 229,152 229,152
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 118,728 118,728 118,728 118,728 118,728
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 7,085 7,085 7,085 7,085 7,085
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 105,082 105,082 105,082 105,082 105,082
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 131,693 131,693 131,693 131,693 131,693
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 43,331 43,331 43,331 43,331 43,331
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 595,928 595,928 595,928 595,928 595,928
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 213,025 213,025 213,025 213,025 213,025
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 236,679 236,679 236,679 236,679 236,679
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS) M2 ### 541,896 541,896 541,896 541,896 541,896
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 136,423 136,423 136,423 136,423 136,423
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 435,299 435,299 435,299 435,299 435,299
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,490 6,490 6,490 6,490 6,490
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 304,562 304,562 304,562 304,562 304,562
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 130,349 130,349 130,349 130,349 130,349
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
10.21 REJILLA PISO 0.30 M M2 ###
i 93,577 93,577 93,577 93,577 93,577
p
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### i 96,244 96,244 96,244 96,244 96,244
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, o
10.23 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 11,198 11,198 11,198 11,198 11,198
PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,
10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 12,486 12,486 12,486 12,486 12,486
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10.25 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 9,814 9,814 9,814 9,814 9,814
SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 235,080 235,080 235,080 235,080 235,080
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 285,704 285,704 285,704 285,704 285,704
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,754 23,754 23,754 23,754 23,754
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 37,440 37,440 37,440 37,440 37,440
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 35,673 35,673 35,673 35,673 35,673
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 45,968 45,968 45,968 45,968 45,968
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 95,424 95,424 95,424 95,424 95,424
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 236,591 236,591 236,591 236,591 236,591
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,416 44,416 44,416 44,416 44,416
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 37,190 37,190 37,190 37,190 37,190
11.13 NIPLE PASAMURO 2" UN ### 69,848 69,848 69,848 69,848 69,848
11.14 NIPLE PASAMURO 4" UN ### 104,659 104,659 104,659 104,659 104,659
11.15 PUNTO AGUA CALIENTE CPVC UN ### 89,206 89,206 89,206 89,206 89,206
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 63,927 63,927 63,927 63,927 63,927
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 68,268 68,268 68,268 68,268 68,268
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 86,325 86,325 86,325 86,325 86,325
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 70,313 70,313 70,313 70,313 70,313
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 88,849 88,849 88,849 88,849 88,849
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 95,271 95,271 95,271 95,271 95,271
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 79,955 79,955 79,955 79,955 79,955
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,454 13,454 13,454 13,454 13,454
11.24 RED SUMINISTRO CPVC 3/4" ML ### 19,111 19,111 19,111 19,111 19,111
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
11.25 RED SUMINISTRO PVC 1 1/2" ML ###
i 24,918 24,918 24,918 24,918 24,918
p
11.26 RED SUMINISTRO PVC 1" ML ### i 15,286 15,286 15,286 15,286 15,286
11.27 RED SUMINISTRO PVC 1/2" ML ### o 9,062 9,062 9,062 9,062 9,062
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 55,923 55,923 55,923 55,923 55,923
11.29 RED SUMINISTRO PVC 2" ML ### 35,635 35,635 35,635 35,635 35,635
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,396 11,396 11,396 11,396 11,396
11.31 RED SANITARIA PVC-S 2" ML ### 27,369 27,369 27,369 27,369 27,369
11.32 RED SANITARIA PVC-S 3" ML ### 38,101 38,101 38,101 38,101 38,101
11.33 RED SANITARIA PVC-S 4" ML ### 51,793 51,793 51,793 51,793 51,793
11.34 RED SANITARIA PVC-S 6" ML ### 97,721 97,721 97,721 97,721 97,721
11.35 REGISTRO 1" UN ### 117,860 117,860 117,860 117,860 117,860
11.36 REGISTRO 1/2" UN ### 65,564 65,564 65,564 65,564 65,564
11.37 REGISTRO 3/4" UN ### 83,842 83,842 83,842 83,842 83,842
11.38 REGISTRO 1 1/2" UN ### 203,615 203,615 203,615 203,615 203,615
11.39 REGISTRO 2 1/2" UN ### 421,613 421,613 421,613 421,613 421,613
11.40 REGISTRO 2" UN ### 310,809 310,809 310,809 310,809 310,809
11.41 REVENTILACIÓN 2" ML ### 18,986 18,986 18,986 18,986 18,986
11.42 REVENTILACIÓN 3" ML ### 23,999 23,999 23,999 23,999 23,999
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 186,863 186,863 186,863 186,863 186,863
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 305,727 305,727 305,727 305,727 305,727
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 509,925 509,925 509,925 509,925 509,925
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 44,102 44,102 44,102 44,102 44,102
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 52,072 52,072 52,072 52,072 52,072

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 66,155 66,155 66,155 66,155 66,155

11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 75,664 75,664 75,664 75,664 75,664
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y
11.50 SOPORTES) ML ### 97,618 97,618 97,618 97,618 97,618

11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 111,774 111,774 111,774 111,774 111,774

11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 164,814 164,814 164,814 164,814 164,814
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 65,988 65,988 65,988 65,988 65,988
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 66,268 66,268 66,268 66,268 66,268
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 43,213 43,213 43,213 43,213 43,213
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 53,539 53,539 53,539 53,539 53,539
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ###
i 4,571 4,571 4,571 4,571 4,571
p
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### i 7,243 7,243 7,243 7,243 7,243
11.59 GABINETE TIPO III UN ### o 1,113,845 1,113,845 1,113,845 1,113,845 1,113,845
11.60 GABINETE TIPO I UN ### 847,087 847,087 847,087 847,087 847,087
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,888,920 2,888,920 2,888,920 2,888,920 2,888,920
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,406,346 2,406,346 2,406,346 2,406,346 2,406,346
11.63 VÁLVULA MARIPOSA 3" UN ### 689,135 689,135 689,135 689,135 689,135
11.64 VÁLVULA MARIPOSA 4" UN ### 895,657 895,657 895,657 895,657 895,657
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 348,842 348,842 348,842 348,842 348,842

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 398,129 398,129 398,129 398,129 398,129
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 63,287 63,287 63,287 63,287 63,287
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 75,097 75,097 75,097 75,097 75,097
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 83,163 83,163 83,163 83,163 83,163
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 98,178 98,178 98,178 98,178 98,178
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 59,385 59,385 59,385 59,385 59,385
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 67,778 67,778 67,778 67,778 67,778
12.8 STRIP TELEFÓNICO 10 PARES UN ### 155,275 155,275 155,275 155,275 155,275
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 61,062 61,062 61,062 61,062 61,062
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 140,574 140,574 140,574 140,574 140,574
12.11 SALIDA T.V PVC COMPLETA. UN ### 83,866 83,866 83,866 83,866 83,866
12.12 SALIDA BIFÁSICA C.N. UN ### 49,763 49,763 49,763 49,763 49,763
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 104,339 104,339 104,339 104,339 104,339
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 444,964 444,964 444,964 444,964 444,964
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 593,825 593,825 593,825 593,825 593,825
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,849 3,849 3,849 3,849 3,849
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 5,076 5,076 5,076 5,076 5,076
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,917 7,917 7,917 7,917 7,917
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 14,145 14,145 14,145 14,145 14,145
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 297,788 297,788 297,788 297,788 297,788
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 83,746 83,746 83,746 83,746 83,746
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 114,039 114,039 114,039 114,039 114,039
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 45,421 45,421 45,421 45,421 45,421
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,516,909 1,516,909 1,516,909 1,516,909 1,516,909
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,123,527 1,123,527 1,123,527 1,123,527 1,123,527
12.26 POSTE METÁLICO 6M UN ### 1,424,879 1,424,879 1,424,879 1,424,879 1,424,879
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ###
i 666,499 666,499 666,499 666,499 666,499
p
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### i 120,234 120,234 120,234 120,234 120,234
12.29 LUMINARIA 70W SODIO UN ### o 559,632 559,632 559,632 559,632 559,632
12.30 LUMINARIA 150W SODIO UN ### 700,765 700,765 700,765 700,765 700,765
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,854,809 1,854,809 1,854,809 1,854,809 1,854,809
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,365,209 1,365,209 1,365,209 1,365,209 1,365,209

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 45,282 46,578 43,986 46,194 45,474
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 45,543 46,839 44,247 46,455 45,735
13.3 ALISTADO PARA LISTÓN M2 ### 15,961 16,220 15,701 16,143 15,999
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 35,648 38,240 33,056 37,472 36,032
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 98,716 101,308 96,124 100,540 99,100
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 28,961 29,761 28,160 29,524 29,079
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 67,967 71,865 64,069 70,710 68,544
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 96,311 102,548 90,075 100,700 97,235
13.9 MANTO FIBERGLASS 600X1 M2 ### 33,037 33,037 33,037 33,037 33,037
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,462 24,462 24,462 24,462 24,462
13.11 PERMA PLY 2 CAPAS M2 ### 28,540 28,540 28,540 28,540 28,540
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 56,066 59,574 52,558 58,535 56,586
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 66,102 70,390 61,815 69,119 66,737
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 96,879 103,505 90,252 101,541 97,860
13.15 TRITURADO FINO 1/2 M3 ### 158,344 187,405 129,282 178,795 162,649
13.16 TRITURADO GRUESO 3/4 M3 ### 150,615 172,578 129,825 169,241 150,273

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 62,991 63,510 62,473 63,356 63,068
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 37,170 37,430 36,911 37,353 37,209
14.3 ADOQUÍN CONCRETO 6CM M2 ### 73,360 74,656 72,064 74,272 73,552
14.4 ADOQUÍN CONCRETO 8CM M2 ### 77,110 78,406 75,814 78,022 77,302
14.5 ADOQUÍN GRES PEATONAL M2 ### 81,739 83,035 80,443 82,651 81,931
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE
14.6 ALISTADO M2 ### 83,457 83,976 82,939 83,822 83,534
14.7 GRAVILLA PARA GRADAS ML ### 38,982 39,501 38,464 39,347 39,059
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 184,701 187,034 182,369 186,343 185,047
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 50,387 51,683 49,091 51,299 50,579
14.10 GUARDAESCOBA EN GRANITO ML ### 46,175 46,175 46,175 46,175 46,175
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
14.11 GUARDAESCOBA EN GRAVILLA ML ###
i 11,445 11,964 10,927 11,810 11,522
p
14.12 GUARDAESCOBA PVC CARAMELO ML ### i 10,373 10,373 10,373 10,373 10,373
14.13 GUARDAESCOBA PVC CEDRO ML ### o 13,967 13,967 13,967 13,967 13,967
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,310 11,310 11,310 11,310 11,310
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 19,255 19,255 19,255 19,255 19,255
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 37,949 37,949 37,949 37,949 37,949
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,560 9,560 9,560 9,560 9,560
14.18 LISTÓN M.H. AMARILLO M2 ### 80,430 80,430 80,430 80,430 80,430
14.19 PASO ESCALERA GRANITO ML ### 131,159 132,973 129,345 132,436 131,428
14.20 PIRLANES ALUMINIO ML ### 7,727 7,727 7,727 7,727 7,727
14.21 PIRLANES LADRILLO ML ### 34,215 34,566 33,864 34,462 34,267
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 50,343 50,343 50,343 50,343 50,343
14.23 PISO VINILO TRÁFICO PESADO M2 ### 58,722 58,722 58,722 58,722 58,722
14.24 PULIDA LACADA PISO MADERA M2 ### 52,767 52,767 52,767 52,767 52,767
14.25 TABLETA DE GRES 25X25 M2 ### 54,637 55,155 54,119 55,002 54,714
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 61,423 61,941 60,904 61,787 61,499
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,492 11,492 11,492 11,492 11,492
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 54,146 54,673 53,620 54,517 54,224
14.29 JABONERA PORCELANA ACUARIO UN ### 22,544 22,544 22,544 22,544 22,544
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y
14.30 PERCHA SIMPLE) UN ### 135,763 135,763 135,763 135,763 135,763
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,425 10,425 10,425 10,425 10,425
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 24,493 24,493 24,493 24,493 24,493
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,469 15,469 15,469 15,469 15,469
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 15,009 15,009 15,009 15,009 15,009
14.35 REMATES BOCEL ALUMINIO ML ### 8,893 8,893 8,893 8,893 8,893
14.36 REMATES BOCEL PORCELANA ML ### 9,061 9,061 9,061 9,061 9,061
14.37 TAPA REGISTRO 20X20 UN ### 20,646 20,646 20,646 20,646 20,646
14.38 TAPA REGISTRO 6X6 UN ### 18,755 18,755 18,755 18,755 18,755
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,919 20,919 20,919 20,919 20,919
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 24,183 24,183 24,183 24,183 24,183
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 72,566 73,084 72,048 72,931 72,643
14.42 MEDIA CAÑA EN GRANITO ML ### 86,018 86,018 86,018 86,018 86,018
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 35,025 35,025 35,025 35,025 35,025
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,312 14,312 14,312 14,312 14,312
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 113,720 113,720 113,720 113,720 113,720
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ###
i 136,995 136,995 136,995 136,995 136,995
p
i
15 CIELO RASO o
15.1 APLIQUE YESO ML ### 80,719 80,719 80,719 80,719 80,719
15.2 ARMADURA MADERA Y MALLA M2 ### 37,611 37,611 37,611 37,611 37,611
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 59,766 59,766 59,766 59,766 59,766
15.4 CIELO RASO DURACUSTIC M2 ### 73,848 73,848 73,848 73,848 73,848
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 54,918 54,918 54,918 54,918 54,918
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 102,781 102,781 102,781 102,781 102,781
15.7 CORNISAS YESO ML ### 54,316 54,316 54,316 54,316 54,316
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 114,094 114,094 114,094 114,094 114,094
15.9 MALLA CON VENA M2 ### 14,102 14,102 14,102 14,102 14,102

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
16.2 UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 69,981 59,407 86,050 75,831 53,557
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 156,950 185,462 128,438 177,014 161,174
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 144,679 199,508 156,673 175,520 199,508
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 143,942 158,188 137,089 133,662 119,955
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 128,495 183,323 140,488 159,336 183,323
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 141,648 196,477 153,642 172,489 196,477

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 333,726 333,726 333,726 333,726 333,726
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 991,530 991,530 991,530 991,530 991,530
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 535,563 535,563 535,563 535,563 535,563
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 151,792 151,792 151,792 151,792 151,792
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 214,886 214,886 214,886 214,886 214,886
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ###
i 199,263 199,263 199,263 199,263 199,263
p
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### i 443,725 443,725 443,725 443,725 443,725
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### o 1,140,993 1,140,993 1,140,993 1,140,993 1,140,993
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 321,177 321,177 321,177 321,177 321,177
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 225,825 225,825 225,825 225,825 225,825
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 87,504 87,504 87,504 87,504 87,504
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X
17.12 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 274,888 274,888 274,888 274,888 274,888
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120
17.13 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 406,932 406,932 406,932 406,932 406,932

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,837 8,837 8,837 8,837 8,837
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,310 3,310 3,310 3,310 3,310
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,595 11,595 11,595 11,595 11,595
18.4 BARNIZ SOBRE MUEBLES M2 ### 45,170 45,170 45,170 45,170 45,170
18.5 CARBURO SOBRE PAÑETES M2 ### 6,089 6,089 6,089 6,089 6,089
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 72,936 72,936 72,936 72,936 72,936
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,594 3,594 3,594 3,594 3,594
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,956 2,956 2,956 2,956 2,956
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,705 14,705 14,705 14,705 14,705
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,284 4,284 4,284 4,284 4,284
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,517 15,517 15,517 15,517 15,517
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,234 6,234 6,234 6,234 6,234
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 7,057 7,057 7,057 7,057 7,057
18.14 ESTUCO M2 ### 7,273 7,273 7,273 7,273 7,273
18.15 ESTUCO (LINEAL) ML ### 4,531 4,531 4,531 4,531 4,531
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,319 16,319 16,319 16,319 16,319
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,038 10,038 10,038 10,038 10,038
18.18 LACA PISOS MADERA M2 ### 23,615 23,615 23,615 23,615 23,615
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,812 2,812 2,812 2,812 2,812
18.20 MARMOLINA SOBRE PAÑETE M2 ### 13,156 13,156 13,156 13,156 13,156
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,538 3,538 3,538 3,538 3,538
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,320 13,320 13,320 13,320 13,320
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,462 7,462 7,462 7,462 7,462
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,651 4,651 4,651 4,651 4,651
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 23,472 23,472 23,472 23,472 23,472
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
18.26 PINTURA EPÓXICA M2 ###
i 13,260 13,260 13,260 13,260 13,260
p
18.27 PINTURA EPÓXICA (LINEAL) ML ### i 8,139 8,139 8,139 8,139 8,139
o
19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,778,105 6,778,105 6,778,105 6,778,105 6,778,105
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO
19.2 PARA MOVILIZAR (PAR) UN ### 11,975,748 11,975,748 11,975,748 11,975,748 11,975,748
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,133,583 3,133,583 3,133,583 3,133,583 3,133,583
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 10,241,902 10,241,902 10,241,902 10,241,902 10,241,902
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,593,796 9,593,796 9,593,796 9,593,796 9,593,796
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,812 2,812 2,812 2,812 2,812
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 959,112 959,112 959,112 959,112 959,112
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 96,205 96,205 96,205 96,205 96,205
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,740,495 1,740,895 1,740,094 1,740,777 1,740,554
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 757,922 767,476 748,368 764,645 759,338

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 31,574 31,574 31,574 31,574 31,574
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 47,399 47,399 47,399 47,399 47,399
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 58,932 58,932 58,932 58,932 58,932
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,837 18,837 18,837 18,837 18,837
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,943 22,943 22,943 22,943 22,943
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 31,438 31,438 31,438 31,438 31,438
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,423 27,423 27,423 27,423 27,423
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,941 28,941 28,941 28,941 28,941
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 36,356 36,356 36,356 36,356 36,356
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 19,359 19,359 19,359 19,359 19,359
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 25,456 25,456 25,456 25,456 25,456
20.12 VÁLVULA DE BOLA GAS 1" UN ### 39,331 39,331 39,331 39,331 39,331
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 303,226 303,226 303,226 303,226 303,226
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 349,237 349,237 349,237 349,237 349,237
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 363,882 363,882 363,882 363,882 363,882
20.16 ACOMETIDA GAS 1/2" ML ### 336,340 336,340 336,340 336,340 336,340

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 245,663 245,663 245,663 245,663 245,663
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 37,900 37,900 37,900 37,900 37,900
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
21.3 SIRENA DE 110 V UN ###
i 113,893 113,893 113,893 113,893 113,893
p
21.4 CÁMARA CCTV UN ### i 282,979 282,979 282,979 282,979 282,979
21.5 PARLANTE-CIELO FALSO UN ### o 56,312 56,312 56,312 56,312 56,312
21.6 AMPLIFICADOR 100W UN ### 631,701 631,701 631,701 631,701 631,701
21.7 AMPLIFICADOR 300W UN ### 1,580,058 1,580,058 1,580,058 1,580,058 1,580,058
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,827 45,827 45,827 45,827 45,827
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 246,536 246,536 246,536 246,536 246,536
21.10 TOMA PARA MICRÓFONO UN ### 47,068 47,068 47,068 47,068 47,068
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 4,114 4,114 4,114 4,114 4,114
21.12 SPLITERS UN ### 7,008 7,008 7,008 7,008 7,008
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,445 19,445 19,445 19,445 19,445
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,600 25,600 25,600 25,600 25,600
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,379 33,379 33,379 33,379 33,379
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 135,672 135,672 135,672 135,672 135,672
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 35,360 35,360 35,360 35,360 35,360
21.18 BANDEJA PORTACABLES PARA RACK UN ### 116,331 116,331 116,331 116,331 116,331
21.19 RACK 2' X 24" UN ### 196,253 196,253 196,253 196,253 196,253
21.20 RACK 3' X 24" UN ### 313,460 313,460 313,460 313,460 313,460
21.21 RACK 5' X 24" UN ### 387,106 387,106 387,106 387,106 387,106
21.22 RACK 7' X 24" UN ### 424,197 424,197 424,197 424,197 424,197
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 614,128 614,128 614,128 614,128 614,128
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 359,716 359,716 359,716 359,716 359,716
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 114,919 114,919 114,919 114,919 114,919
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 15,416 15,416 15,416 15,416 15,416
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 31,588 31,588 31,588 31,588 31,588
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,409 5,409 5,409 5,409 5,409
21.29 CANALETA METÁLICA 4X6 CMS ML ### 37,770 37,770 37,770 37,770 37,770
21.30 CANALETA METÁLICA 4X10 CMS ML ### 39,538 39,538 39,538 39,538 39,538
21.31 CANALETA METÁLICA 6X10 CMS ML ### 40,421 40,421 40,421 40,421 40,421
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 26,338 26,338 26,338 26,338 26,338
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 29,246 29,246 29,246 29,246 29,246
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 30,468 30,468 30,468 30,468 30,468
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 51,944 51,944 51,944 51,944 51,944
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 676,952 676,952 676,952 676,952 676,952
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 345,626 345,626 345,626 345,626 345,626
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 94,417 94,417 94,417 94,417 94,417
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,975 1,975 1,975 1,975 1,975
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
21.40 CABLE TELEFÓNICO 10 PARES ML ###
i 9,150 9,150 9,150 9,150 9,150
p
21.41 CABLE TELEFÓNICO 20 PARES ML ### i 13,788 13,788 13,788 13,788 13,788
21.42 CABLE TELEFÓNICO 40 PARES ML ### o 23,124 23,124 23,124 23,124 23,124
21.43 CABLE TELEVISIÓN RG6 ML ### 4,235 4,235 4,235 4,235 4,235
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,126 23,126 23,126 23,126 23,126
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,009 34,009 34,009 34,009 34,009
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,541 20,541 20,541 20,541 20,541
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 16,639 16,639 16,639 16,639 16,639
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 688,330 688,330 688,330 688,330 688,330
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
URBANISMO
p
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 100,619 100,619 100,619 100,619 100,619
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 569,041 569,041 569,041 569,041 569,041
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,214,731 1,214,731 1,214,731 1,214,731 1,214,731
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 138,901 138,901 138,901 138,901 138,901
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 848,772 848,772 848,772 848,772 848,772
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,828,131 1,828,131 1,828,131 1,828,131 1,828,131
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 14,073 14,073 14,073 14,073 14,073
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 17,481 17,481 17,481 17,481 17,481
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 22,084 22,084 22,084 22,084 22,084
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 24,221 24,221 24,221 24,221 24,221
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 29,142 29,142 29,142 29,142 29,142
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 29,142 29,142 29,142 29,142 29,142
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 118,879 118,879 118,879 118,879 118,879
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 137,629 137,629 137,629 137,629 137,629
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 426,232 426,232 426,232 426,232 426,232
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 160,153 160,153 160,153 160,153 160,153
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 264,005 264,005 264,005 264,005 264,005
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,169,832 1,169,832 1,169,832 1,169,832 1,169,832
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,348,017 1,348,017 1,348,017 1,348,017 1,348,017
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 15,441 15,441 15,441 15,441 15,441
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,579 13,579 13,579 13,579 13,579
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 34,442 34,442 34,442 34,442 34,442
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 135,557 135,557 135,557 135,557 135,557
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 202,496 202,496 202,496 202,496 202,496
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 32,788 32,788 32,788 32,788 32,788
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 113,433 113,433 113,433 113,433 113,433
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 168,714 168,714 168,714 168,714 168,714
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 33,273 33,273 33,273 33,273 33,273
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 68,758 68,758 68,758 68,758 68,758
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 278,238 278,238 278,238 278,238 278,238
1.32 UNIÓN REPARACION PVC 4" UN ### 80,330 80,330 80,330 80,330 80,330
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 323,934 323,934 323,934 323,934 323,934
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 192,661 192,661 192,661 192,661 192,661
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 552,708 552,708 552,708 552,708 552,708
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ###
i 1,485,907 1,485,907 1,485,907 1,485,907 1,485,907
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 2,195,839 2,195,839 2,195,839 2,195,839 2,195,839
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,244 11,244 11,244 11,244 11,244
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,591 25,591 25,591 25,591 25,591
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 135,464 162,680 108,248 154,616 139,496
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 64,946 54,372 81,016 70,796 48,522
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 149,002 163,247 142,148 138,721 125,014
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 156,592 192,462 151,468 161,716 156,592
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 92,248 113,143 87,024 97,472 92,248
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 125,118 147,933 102,303 141,173 128,498

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 127,107 127,107 127,107 127,107 127,107
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,328,846 1,328,846 1,328,846 1,328,846 1,328,846
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 166,230 166,230 166,230 166,230 166,230
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,539,226 1,539,226 1,539,226 1,539,226 1,539,226
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,072,534 1,072,534 1,072,534 1,072,534 1,072,534
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 64,091 64,091 64,091 64,091 64,091
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 126,176 126,176 126,176 126,176 126,176
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 298,347 298,347 298,347 298,347 298,347
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 298,340 298,340 298,340 298,340 298,340
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 479,165 479,165 479,165 479,165 479,165
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 126,229 126,229 126,229 126,229 126,229
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 126,229 126,229 126,229 126,229 126,229
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 298,347 298,347 298,347 298,347 298,347
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 298,347 298,347 298,347 298,347 298,347
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 479,165 479,165 479,165 479,165 479,165
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 477,926 477,926 477,926 477,926 477,926
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 778,450 778,450 778,450 778,450 778,450
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,250,248 1,250,248 1,250,248 1,250,248 1,250,248
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 77,179 77,179 77,179 77,179 77,179
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 399,293 399,293 399,293 399,293 399,293
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 450,711 450,711 450,711 450,711 450,711
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,246,055 1,246,055 1,246,055 1,246,055 1,246,055
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 72,898 73,133 72,662 73,063 72,932
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 361,612 361,612 361,612 361,612 361,612
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 55,239 55,239 55,239 55,239 55,239
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 78,276 78,276 78,276 78,276 78,276
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 113,126 113,126 113,126 113,126 113,126
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 173,731 173,731 173,731 173,731 173,731
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 279,531 279,531 279,531 279,531 279,531
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 403,862 403,862 403,862 403,862 403,862
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 511,606 511,606 511,606 511,606 511,606
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 672,875 672,875 672,875 672,875 672,875
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 926,773 926,773 926,773 926,773 926,773

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 758,198 781,128 735,269 774,334 761,595
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO
4.2 E=1.5CM Y CAÑUELA) ML ### 734,718 751,229 718,207 746,337 737,164
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO
4.3 Y TAPA HF) UN ### 797,618 812,904 782,332 808,375 799,883

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 905,184 933,846 876,523 925,354 909,430

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO


4.5 E=1.5CM Y CAÑUELA) ML ### 1,049,086 1,072,336 1,025,835 1,065,447 1,052,530
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE
4.6 ARO Y TAPA HF) UN ### 927,709 948,728 906,691 942,500 930,823
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,055,099 1,065,635 1,044,559 1,062,514 1,056,657
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,564,428 1,595,783 1,533,066 1,586,494 1,569,069
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,212,225 2,272,922 2,151,527 2,254,938 2,221,218
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,959,485 3,060,379 2,858,589 3,030,486 2,974,433
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 2,012,019 2,012,019 2,012,019 2,012,019 2,012,019
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,274,179 4,274,179 4,274,179 4,274,179 4,274,179
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE
4.13 PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 147,712 148,386 147,038 148,186 147,812

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 80,351 81,580 79,123 81,216 80,533
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 95,327 96,556 94,099 96,192 95,509
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 66,597 70,689 62,504 69,477 67,203
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 71,583 75,596 67,571 74,407 72,178
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ###
i 71,661 75,545 67,776 74,394 72,236
p
5.6 BORDE SEPARADOR VERDE A-170 ML ### i 281,486 282,160 280,812 281,960 281,585
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### o 19,838 20,329 19,347 20,183 19,910
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 47,450 50,334 44,566 49,480 47,877
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 91,160 91,520 90,800 91,413 91,213
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 611,288 620,283 602,294 617,618 612,621
5.11 LOSETA PREFABRICADA A-40 M2 ### 70,235 71,777 68,693 71,320 70,463
5.12 LOSETA PREFABRICADA A-60 M2 ### 102,059 103,601 100,516 103,144 102,287
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 38,024 39,629 36,419 39,153 38,261
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 62,672 65,920 59,424 64,958 63,153
5.15 SARDINEL PREFABRICADO A-10 ML ### 107,354 114,082 108,387 111,190 113,776
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 66,725 67,658 65,792 67,382 66,863

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 224,648 226,559 222,738 225,993 224,932
6.2 BANCA EN CONCRETO M-30 UN ### 737,819 740,494 735,144 739,702 738,216
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 234,765 235,165 234,365 235,047 234,824
6.4 BOLARDO M-60 CONCRETO UN ### 179,052 181,345 176,759 180,666 179,392
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 180,920 183,213 178,627 182,533 181,260
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 212,647 215,049 210,245 214,337 213,003
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 63,198 64,139 62,258 63,860 63,338
6.8 BORDILLO PREFABRICADO A-80 ML ### 75,186 76,239 74,133 75,927 75,342
6.9 CANECA M-120 UN ### 343,639 343,874 343,404 343,804 343,674
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 906,375 907,522 905,229 907,182 906,545
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,732,495 3,733,259 3,731,730 3,733,032 3,732,608
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,839,887 3,840,651 3,839,122 3,840,424 3,840,000
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 536,974 537,775 536,174 537,538 537,093
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 714,755 717,957 711,552 717,008 715,229
6.15 BANCA EN MADERA M-50 UN ### 588,519 588,519 588,519 588,519 588,519
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 271,082 272,228 269,935 271,889 271,252
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 635,370 635,958 634,782 635,783 635,457
6.18 POSTE HISTÓRICO M-131 UN ### 7,102,844 7,108,577 7,097,112 7,106,878 7,103,694

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,456 4,456 4,456 4,456 4,456
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 46,973 46,973 46,973 46,973 46,973
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 344,888 345,225 344,551 345,125 344,938
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ###
i 543,019 544,621 541,418 544,146 543,257
p
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### i 254,403 254,740 254,066 254,640 254,453
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### o 270,515 270,852 270,178 270,752 270,565
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 282,717 283,054 282,380 282,954 282,767
7.8 TACHAS REFLECTIVAS UN ### 14,777 14,777 14,777 14,777 14,777
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,799 15,799 15,799 15,799 15,799
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 129,560 129,560 129,560 129,560 129,560
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
VÍAS (SEGÚN ESPECIFICACIONES p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.1 201 P UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.2 201 P DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.3 200.1 DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.5 201.7 DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,610 36,610 36,610 36,610 36,610
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
2.9 600.1 DISTANCIA MENOR DE 5 KM)
M3 ### 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 600.2 DISTANCIA MENOR DE 5 KM) M3 ### 66,587 66,587 66,587 66,587 66,587
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 600.3 DISTANCIA MENOR DE 5 KM) M3 ### 81,361 81,361 81,361 81,361 81,361
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A
2.12 600.4 UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,035 19,035 19,035 19,035 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE
2.13 600.4 P SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 39,738 39,738 39,738 39,738 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE
2.14 600.5 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 31,203 31,203 31,203 31,203 31,203
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO
2.15 600.5 P DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 53,644 53,644 53,644 53,644 53,644
i
o
3 NORMA INV ESTRUCTURA DE PAVIMENTO
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 128,495 183,323 140,488 159,336 183,323
3.3 330.1 BASE GRANULAR M3 ### 141,648 196,477 153,642 172,489 196,477
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3.4 365.1 ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,511 3,511 3,511 3,511 3,511
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,187 1,187 1,187 1,187 1,187
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 251,465 258,852 244,077 256,663 252,559
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 76,293 78,637 73,949 77,943 76,640
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 549,569 681,369 623,707 673,132 607,232
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 552,257 684,057 544,019 578,617 609,919
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 591,109 722,909 582,872 617,469 648,772
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 574,007 705,807 565,769 600,367 631,669
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 305,589 282,964 315,832 361,705 369,088
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 305,974 360,803 317,968 336,815 360,803
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 291,119 345,948 303,113 321,961 345,948
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 41,661 41,661 41,661 41,661 41,661
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 187,187 187,187 187,187 187,187 187,187
3.15 311.1 AFIRMADO M3 ### 143,942 158,188 137,089 133,662 119,955
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 13,215 13,734 12,697 13,580 13,292
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,425 5,685 5,166 5,608 5,464
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO
3.18 500.1 DE TRANSFERENCIA Y UNIÓN
M3 ### 740,701 776,971 704,430 766,224 746,074
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO
3.19 500.1 DE TRANSFERENCIA Y UNIÓN M3 ### 778,819 816,714 740,925 805,486 784,433
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO
3.20 500.1 DE TRANSFERENCIA Y UNIÓN M3 ### 804,086 843,040 765,132 831,498 809,857
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA,
3.21 *** SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,357 7,357 7,357 7,357 7,357
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 127,211 156,207 119,962 134,460 127,211

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 1,024,873 1,066,016 983,731 1,053,826 1,030,969
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 895,185 935,646 854,724 923,658 901,179
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ###
i 945,135 987,198 903,072 974,735 951,367
p
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### i 667,189 704,554 629,823 693,483 672,725
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### o 767,184 806,029 728,338 794,520 772,939
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 666,448 705,046 627,851 693,610 672,166
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 766,413 806,540 726,287 794,651 772,358
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 825,479 864,077 786,882 852,641 831,197
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 689,168 729,295 649,042 717,406 695,113
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 872,668 912,795 832,542 900,906 878,613
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,403 12,403 12,403 12,403 12,403
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588
4.12 650 P GRADO B KG ### 16,090 16,090 16,090 16,090 16,090
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,887 1,887 1,887 1,887 1,887
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE
4.14 621.1 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,872,867 2,872,867 2,872,867 2,872,867 2,872,867
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL
4.15 621.1 P (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS) ML ### 4,378,428 4,448,803 4,308,052 4,427,951 4,388,854
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,833,984 1,872,200 1,795,769 1,860,877 1,839,646
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 94,701 94,701 94,701 94,701 94,701
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 387,165 391,751 382,579 390,392 387,844
4.19 632 P BARANDA METÁLICA ML ### 448,899 448,899 448,899 448,899 448,899
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 18,299 18,299 18,299 18,299 18,299
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 624,645 673,557 580,280 646,569 615,830
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 181,689 232,432 174,440 188,938 181,689
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 70,771 61,010 85,604 76,171 55,610
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 476,046 516,476 435,615 504,497 482,035
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 432,037 466,599 405,383 451,575 435,595
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 440,680 475,242 414,026 460,218 444,238
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 446,224 480,155 420,202 465,317 449,689
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 454,867 488,798 428,845 473,960 458,332
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 612,207 651,574 572,839 639,910 618,039
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 710,273 751,199 669,346 739,072 716,336
4.31 681.1 GAVIÓN M3 ### 219,104 246,782 212,184 226,023 219,104
4.32 681.1 GAVIÓN MALLA PVC M3 ### 223,703 251,381 216,783 230,622 223,703
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 48,279 50,696 45,862 49,980 48,637
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 19,396 20,605 18,188 20,247 19,575
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA
4.35 *** ÚLTIMA 25 KN)
M2 ### 10,926 10,926 10,926 10,926 10,926
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
i
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### p 15,673 15,673 15,673 15,673 15,673
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### i 21,171 21,171 21,171 21,171 21,171
o
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4.38 *** ÚLTIMA 100 KN) M2 ### 25,424 25,424 25,424 25,424 25,424
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4.39 *** ÚLTIMA 165 KN) M2 ### 32,733 32,733 32,733 32,733 32,733
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y
4.40 *** SEPARACIÓN) M2 ### 7,841 7,841 7,841 7,841 7,841

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y


4.41 *** SEPARACIÓN) M2 ### 8,958 8,958 8,958 8,958 8,958

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y


4.42 *** SEPARACIÓN) M2 ### 9,317 9,317 9,317 9,317 9,317

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y


4.43 *** SEPARACIÓN) M2 ### 6,591 6,591 6,591 6,591 6,591

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y


4.44 *** SEPARACIÓN) M2 ### 10,009 10,009 10,009 10,009 10,009

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y


4.45 *** SEPARACIÓN) M2 ### 8,133 8,133 8,133 8,133 8,133

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y


4.46 *** SEPARACIÓN) M2 ### 10,009 10,009 10,009 10,009 10,009

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y


4.47 *** SEPARACIÓN) M2 ### 19,378 19,378 19,378 19,378 19,378

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I,


4.48 661.1 INCLUYE EMBOQUILLADA ML ### 689,326 689,849 688,802 689,694 689,403
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 410,546 419,226 401,866 416,654 411,832
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 966,611 966,611 966,611 966,611 966,611
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 210,424 224,122 203,834 200,539 187,359
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,827 4,827 4,827 4,827 4,827
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 94,282 94,282 94,282 94,282 94,282
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 143,750 143,750 143,750 143,750 143,750
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 628,493 669,419 587,566 657,292 634,556
4.56 682.1 P COLCHONETA RENO M3 ### 235,453 263,131 228,534 242,373 235,453
4.57 *** TRINCHO EN MADERA M2 ### 74,443 74,443 74,443 74,443 74,443

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,456 4,456 4,456 4,456 4,456
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ###
i 46,973 46,973 46,973 46,973 46,973
p
5.3 730.3 TOPE DEFENSA METÁLICA UN ### i 91,934 91,934 91,934 91,934 91,934
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### o 76,385 76,385 76,385 76,385 76,385
5.5 730.1 DEFENSA METÁLICA ML ### 163,801 165,615 161,986 165,077 164,069
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 14,777 14,777 14,777 14,777 14,777

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 859 859 859 859 859
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE
6.2 801.6 RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
UN ### 131,984 131,984 131,984 131,984 131,984
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y
6.3 801.7 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM ML ### 25,566 25,566 25,566 25,566 25,566
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,310 8,310 8,310 8,310 8,310
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6.6 801.4 DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 16,717 16,717 16,717 16,717 16,717
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 27,258 27,258 27,258 27,258 27,258
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 10,044 10,044 10,044 10,044 10,044

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
CONSTRUCCIÓN

2,250,248 2,229,660 2,298,285


1,298,538 1,288,244 1,322,557
14,900 14,900 14,900
16,711 16,711 16,711
19,286 19,286 19,286
71,697 71,697 71,697
51,204 50,982 51,723
24,009 23,787 24,528
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
10,480 10,480 10,480
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
999,730 996,412 1,003,208
11,281 11,281 11,281
4,094 4,094 4,094
2,954,012 2,954,012 2,954,012
270,723 270,723 270,723
9,189 9,189 9,189

157,463 138,616 135,189


264,852 249,154 301,479
297,878 297,878 297,878
207,425 207,425 207,425
24,180 24,180 24,180
780,352 758,484 831,377
784,551 761,942 837,303
729,463 708,294 778,859
50,706 50,706 50,706
156,545 156,545 156,545

198,517 198,517 198,517

249,275 249,275 249,275

317,602 317,602 317,602


116,710 115,175 120,293
146,566 144,341 151,759
715,314 694,144 764,710
93,867 93,867 93,867

41,604 41,507 41,832


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
218,760 218,662 218,987
520,964 503,672 525,911
250,979 247,621 255,829
292,120 286,596 300,317
393,158 384,610 408,411
108,052 107,942 107,881
1,418,161 1,417,067 1,416,450
127,488 126,411 130,002
81,001 80,432 82,327
31,747 31,355 32,662
50,572 50,180 51,486
66,727 66,179 68,007
91,151 90,524 92,614
125,203 124,655 126,484
1,083,400 1,077,130 1,098,030
1,552,160 1,539,620 1,581,420

2,063,887 2,038,807 2,122,407

45,984 45,984 45,984


61,030 61,030 61,030
946,440 925,270 995,835
332,368 313,572 369,958
115,774 113,718 120,569

137,002 134,536 142,757


151,916 148,628 159,589
160,434 156,940 168,587
185,520 181,204 195,591
207,064 202,131 218,574
230,123 224,574 243,071
109,492 109,135 110,323
1,108,276 1,087,107 1,157,672
105,586 105,298 106,258
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
93,562 91,445 98,502
106,300 103,710 112,342
124,998 121,751 132,576
838,445 817,275 887,841
54,356 53,706 55,872
339,081 329,627 361,141
4,602 4,602 4,602
4,827 4,827 4,827
6,608 6,608 6,608
988,312 967,142 1,037,708
920,192 897,021 974,258
983,639 962,470 1,033,035
963,610 942,440 1,013,006
1,175,199 1,154,029 1,224,595
448,301 424,740 503,277

33,023 32,492 34,261


53,544 53,014 54,782
37,122 37,024 37,349
172,993 172,798 173,448
49,068 48,419 50,584
29,950 29,662 30,622
109,386 108,996 110,296
107,029 104,863 112,081
98,182 98,182 98,182
57,015 57,015 57,015
94,414 94,414 94,414
55,131 55,131 55,131
110,441 110,441 110,441
64,465 64,465 64,465
123,228 123,228 123,228
70,859 70,859 70,859
44,330 44,134 44,788
26,479 26,381 26,708
58,024 57,893 58,329
34,391 34,326 34,544
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
65,171 65,040 65,476
38,638 38,573 38,790
109,571 108,917 111,095
63,864 63,538 64,626
40,387 40,257 40,692
24,174 24,109 24,327
80,873 80,612 81,483
48,098 47,967 48,402
97,406 97,118 98,078
58,041 57,897 58,377
201,868 200,953 204,002
119,328 118,871 120,395
100,789 100,188 102,190
59,733 59,432 60,433
51,546 51,253 52,228
30,872 30,725 31,213
36,553 36,422 36,858
21,982 21,917 22,135
56,138 55,877 56,748
33,850 33,719 34,155
108,310 107,918 109,225
64,903 64,707 65,361
78,820 78,559 79,430
46,961 46,831 47,266
167,452 166,538 169,586
100,218 99,760 101,285
34,275 34,177 34,502
41,216 40,784 42,224
68,795 68,219 70,139
5,316 5,316 5,316
53,922 53,392 55,160
10,740 10,740 10,740
14,397 14,397 14,397
18,874 18,874 18,874
26,758 26,758 26,758
40,356 40,356 40,356
5,868 5,710 6,238
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí

16,537 16,537 16,537


6,236 6,139 6,464
7,422 7,325 7,650
8,811 8,713 9,038
7,360 7,360 7,360
14,209 14,209 14,209
27,075 26,655 28,056
16,132 15,922 16,622
22,827 22,553 23,467
13,697 13,560 14,017
23,184 22,764 24,165
13,876 13,666 14,366
22,827 22,553 23,467
13,697 13,560 14,017
24,154 23,854 24,853
14,360 14,210 14,709
18,874 18,665 19,362
11,433 11,328 11,676
19,147 18,826 19,894
11,569 11,409 11,942
23,605 23,331 24,245
14,066 13,929 14,387
23,963 23,542 24,943
14,245 14,035 14,736
19,757 19,437 20,504
11,856 11,696 12,230
24,852 24,432 25,833
15,094 14,884 15,584

29,275 28,883 30,189


94,730 93,647 97,256
60,564 60,564 60,564
23,754 23,754 23,754
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
37,440 37,440 37,440
88,821 88,821 88,821
69,318 69,318 69,318
39,865 39,865 39,865
93,141 93,141 93,141
111,426 111,426 111,426
164,262 164,262 164,262
64,079 64,079 64,079
88,594 88,594 88,594
80,347 80,347 80,347
144,527 144,527 144,527
84,666 84,666 84,666
61,966 61,966 61,966
34,410 34,410 34,410
64,682 64,195 65,820
51,685 51,685 51,685
47,325 47,325 47,325
39,278 39,278 39,278
38,514 38,514 38,514
38,813 38,813 38,813
55,164 55,164 55,164
48,370 48,370 48,370
89,256 89,256 89,256
165,731 165,731 165,731
74,160 74,160 74,160
44,945 44,945 44,945
35,467 35,467 35,467
62,916 62,916 62,916
21,054 21,054 21,054
25,550 25,550 25,550
27,850 27,850 27,850
36,150 36,150 36,150
23,593 23,593 23,593
55,692 55,692 55,692
394,720 394,720 394,720
430,967 430,967 430,967
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
295,938 295,938 295,938
317,335 317,335 317,335

589,961 567,706 641,891


519,863 499,310 567,820
519,853 498,622 569,392
472,809 451,155 523,335
449,788 427,549 501,679
420,133 397,258 473,508
303,680 290,225 335,075
531,138 518,073 561,623
548,154 528,138 594,858
609,847 591,127 653,527
861,107 842,387 904,787

133,817 133,817 133,817


4,564 4,466 4,791
148,895 148,895 148,895
183,292 183,292 183,292
270,065 270,065 270,065
300,813 300,813 300,813
331,594 331,594 331,594
220,741 220,741 220,741
250,414 250,414 250,414
369,106 369,106 369,106
139,141 139,141 139,141
185,134 185,134 185,134
205,905 205,905 205,905
526,371 526,371 526,371
45,434 45,434 45,434
27,798 27,798 27,798
107,333 107,333 107,333
134,326 134,326 134,326
104,208 104,208 104,208
31,865 31,865 31,865
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
31,865 31,865 31,865
30,174 30,174 30,174
45,973 45,973 45,973
57,211 57,211 57,211
69,198 69,198 69,198
83,434 83,434 83,434
396,409 396,409 396,409
276,531 276,531 276,531
36,232 36,232 36,232
46,722 46,722 46,722
57,211 57,211 57,211
72,196 72,196 72,196

82,404 82,404 82,404


233,089 233,089 233,089
86,645 86,645 86,645
153,027 153,027 153,027
147,445 147,445 147,445
96,763 96,763 96,763
229,152 229,152 229,152
118,728 118,728 118,728
7,085 7,085 7,085
105,082 105,082 105,082
131,693 131,693 131,693
43,331 43,331 43,331
595,928 595,928 595,928
213,025 213,025 213,025
236,679 236,679 236,679
541,896 541,896 541,896
136,423 136,423 136,423
435,299 435,299 435,299
6,490 6,490 6,490
304,562 304,562 304,562
130,349 130,349 130,349
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
93,577 93,577 93,577
96,244 96,244 96,244

11,198 11,198 11,198

12,486 12,486 12,486

9,814 9,814 9,814

235,080 235,080 235,080


285,704 285,704 285,704
23,754 23,754 23,754
37,440 37,440 37,440
35,673 35,673 35,673
45,968 45,968 45,968
95,424 95,424 95,424
236,591 236,591 236,591
44,416 44,416 44,416
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
37,190 37,190 37,190
69,848 69,848 69,848
104,659 104,659 104,659
89,206 89,206 89,206
63,927 63,927 63,927
68,268 68,268 68,268
86,325 86,325 86,325
70,313 70,313 70,313
88,849 88,849 88,849
95,271 95,271 95,271
79,955 79,955 79,955
13,454 13,454 13,454
19,111 19,111 19,111
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
24,918 24,918 24,918
15,286 15,286 15,286
9,062 9,062 9,062
55,923 55,923 55,923
35,635 35,635 35,635
11,396 11,396 11,396
27,369 27,369 27,369
38,101 38,101 38,101
51,793 51,793 51,793
97,721 97,721 97,721
117,860 117,860 117,860
65,564 65,564 65,564
83,842 83,842 83,842
203,615 203,615 203,615
421,613 421,613 421,613
310,809 310,809 310,809
18,986 18,986 18,986
23,999 23,999 23,999
186,863 186,863 186,863
305,727 305,727 305,727
509,925 509,925 509,925
44,102 44,102 44,102
52,072 52,072 52,072

66,155 66,155 66,155

75,664 75,664 75,664

97,618 97,618 97,618

111,774 111,774 111,774

164,814 164,814 164,814


65,988 65,988 65,988
66,268 66,268 66,268
43,213 43,213 43,213
53,539 53,539 53,539
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
4,571 4,571 4,571
7,243 7,243 7,243
1,113,845 1,113,845 1,113,845
847,087 847,087 847,087
2,888,920 2,888,920 2,888,920
2,406,346 2,406,346 2,406,346
689,135 689,135 689,135
895,657 895,657 895,657
348,842 348,842 348,842

398,129 398,129 398,129


63,287 63,287 63,287
75,097 75,097 75,097
83,163 83,163 83,163
98,178 98,178 98,178
59,385 59,385 59,385
67,778 67,778 67,778
155,275 155,275 155,275
61,062 61,062 61,062
140,574 140,574 140,574
83,866 83,866 83,866
49,763 49,763 49,763
104,339 104,339 104,339
444,964 444,964 444,964
593,825 593,825 593,825
3,849 3,849 3,849
5,076 5,076 5,076
7,917 7,917 7,917
14,145 14,145 14,145
297,788 297,788 297,788
83,746 83,746 83,746
114,039 114,039 114,039
45,421 45,421 45,421
1,516,909 1,516,909 1,516,909
1,123,527 1,123,527 1,123,527
1,424,879 1,424,879 1,424,879
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
666,499 666,499 666,499
120,234 120,234 120,234
559,632 559,632 559,632
700,765 700,765 700,765
1,854,809 1,854,809 1,854,809
1,365,209 1,365,209 1,365,209

46,050 45,330 47,730


46,311 45,591 47,991
16,114 15,970 16,450
37,184 35,744 40,544
100,252 98,812 103,612
29,435 28,990 30,473
70,277 68,111 75,329
100,007 96,542 108,091
33,037 33,037 33,037
24,462 24,462 24,462
28,540 28,540 28,540
58,145 56,196 62,693
68,643 66,261 74,201
100,805 97,124 109,395
175,566 159,420 213,238
170,502 152,330 195,842

63,299 63,011 63,971


37,324 37,180 37,660
74,128 73,408 75,808
77,878 77,158 79,558
82,507 81,787 84,187
83,765 83,477 84,437
39,289 39,001 39,961
186,084 184,788 189,108
51,155 50,435 52,835
46,175 46,175 46,175
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
11,752 11,464 12,424
10,373 10,373 10,373
13,967 13,967 13,967
11,310 11,310 11,310
19,255 19,255 19,255
37,949 37,949 37,949
9,560 9,560 9,560
80,430 80,430 80,430
132,234 131,226 134,586
7,727 7,727 7,727
34,423 34,228 34,878
50,343 50,343 50,343
58,722 58,722 58,722
52,767 52,767 52,767
54,944 54,656 55,616
61,730 61,442 62,402
11,492 11,492 11,492
54,458 54,166 55,141
22,544 22,544 22,544
135,763 135,763 135,763
10,425 10,425 10,425
24,493 24,493 24,493
15,469 15,469 15,469
15,009 15,009 15,009
8,893 8,893 8,893
9,061 9,061 9,061
20,646 20,646 20,646
18,755 18,755 18,755
20,919 20,919 20,919
24,183 24,183 24,183
72,873 72,585 73,545
86,018 86,018 86,018
35,025 35,025 35,025
14,312 14,312 14,312
113,720 113,720 113,720
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
136,995 136,995 136,995

80,719 80,719 80,719


37,611 37,611 37,611
59,766 59,766 59,766
73,848 73,848 73,848
54,918 54,918 54,918
102,781 102,781 102,781
54,316 54,316 54,316
114,094 114,094 114,094
14,102 14,102 14,102

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
43,707 43,707 43,707

49,987 49,987 49,987


85,005 85,005 85,005
19,114 19,114 19,114
92,255 73,408 64,547
173,846 158,006 210,806
166,953 148,106 208,075
147,369 128,522 125,095
150,769 131,921 191,890
163,922 145,075 205,044

333,726 333,726 333,726


991,530 991,530 991,530
535,563 535,563 535,563
151,792 151,792 151,792
214,886 214,886 214,886
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
199,263 199,263 199,263
443,725 443,725 443,725
1,140,993 1,140,993 1,140,993
321,177 321,177 321,177
225,825 225,825 225,825
87,504 87,504 87,504
274,888 274,888 274,888

406,932 406,932 406,932

8,837 8,837 8,837


3,310 3,310 3,310
11,595 11,595 11,595
45,170 45,170 45,170
6,089 6,089 6,089
72,936 72,936 72,936
3,594 3,594 3,594
2,956 2,956 2,956
14,705 14,705 14,705
4,284 4,284 4,284
15,517 15,517 15,517
6,234 6,234 6,234
7,057 7,057 7,057
7,273 7,273 7,273
4,531 4,531 4,531
16,319 16,319 16,319
10,038 10,038 10,038
23,615 23,615 23,615
2,812 2,812 2,812
13,156 13,156 13,156
3,538 3,538 3,538
13,320 13,320 13,320
7,462 7,462 7,462
4,651 4,651 4,651
23,472 23,472 23,472
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
13,260 13,260 13,260
8,139 8,139 8,139

6,778,105 6,778,105 6,778,105


11,975,748 11,975,748 11,975,748
3,133,583 3,133,583 3,133,583
10,241,902 10,241,902 10,241,902
9,593,796 9,593,796 9,593,796
2,812 2,812 2,812
959,112 959,112 959,112
96,205 96,205 96,205
1,740,732 1,740,510 1,741,251
763,584 758,276 775,969

31,574 31,574 31,574


47,399 47,399 47,399
58,932 58,932 58,932
18,837 18,837 18,837
22,943 22,943 22,943
31,438 31,438 31,438
27,423 27,423 27,423
28,941 28,941 28,941
36,356 36,356 36,356
19,359 19,359 19,359
25,456 25,456 25,456
39,331 39,331 39,331
303,226 303,226 303,226
349,237 349,237 349,237
363,882 363,882 363,882
336,340 336,340 336,340

245,663 245,663 245,663


37,900 37,900 37,900
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
113,893 113,893 113,893
282,979 282,979 282,979
56,312 56,312 56,312
631,701 631,701 631,701
1,580,058 1,580,058 1,580,058
45,827 45,827 45,827
246,536 246,536 246,536
47,068 47,068 47,068
4,114 4,114 4,114
7,008 7,008 7,008
19,445 19,445 19,445
25,600 25,600 25,600
33,379 33,379 33,379
135,672 135,672 135,672
35,360 35,360 35,360
116,331 116,331 116,331
196,253 196,253 196,253
313,460 313,460 313,460
387,106 387,106 387,106
424,197 424,197 424,197
614,128 614,128 614,128
359,716 359,716 359,716
114,919 114,919 114,919
15,416 15,416 15,416
31,588 31,588 31,588
5,409 5,409 5,409
37,770 37,770 37,770
39,538 39,538 39,538
40,421 40,421 40,421
26,338 26,338 26,338
29,246 29,246 29,246
30,468 30,468 30,468
51,944 51,944 51,944
676,952 676,952 676,952
345,626 345,626 345,626
94,417 94,417 94,417
1,975 1,975 1,975
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
9,150 9,150 9,150
13,788 13,788 13,788
23,124 23,124 23,124
4,235 4,235 4,235
23,126 23,126 23,126
34,009 34,009 34,009
20,541 20,541 20,541
16,639 16,639 16,639
688,330 688,330 688,330
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
URBANISMO

9,712 9,712 9,712


100,619 100,619 100,619
569,041 569,041 569,041
1,214,731 1,214,731 1,214,731
138,901 138,901 138,901
848,772 848,772 848,772
1,828,131 1,828,131 1,828,131
14,073 14,073 14,073
17,481 17,481 17,481
22,084 22,084 22,084
24,221 24,221 24,221
29,142 29,142 29,142
29,142 29,142 29,142
118,879 118,879 118,879
137,629 137,629 137,629
426,232 426,232 426,232
160,153 160,153 160,153
264,005 264,005 264,005
1,169,832 1,169,832 1,169,832
1,348,017 1,348,017 1,348,017
15,441 15,441 15,441
13,579 13,579 13,579
34,442 34,442 34,442
135,557 135,557 135,557
202,496 202,496 202,496
32,788 32,788 32,788
113,433 113,433 113,433
168,714 168,714 168,714
33,273 33,273 33,273
68,758 68,758 68,758
278,238 278,238 278,238
80,330 80,330 80,330
323,934 323,934 323,934
192,661 192,661 192,661
552,708 552,708 552,708
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
1,485,907 1,485,907 1,485,907
2,195,839 2,195,839 2,195,839

11,244 11,244 11,244


25,591 25,591 25,591
19,114 19,114 19,114
151,592 136,472 186,872
87,221 68,373 59,512
152,429 133,581 130,154
166,840 151,468 187,337
102,695 87,024 123,590
138,638 125,963 168,213

127,107 127,107 127,107


1,328,846 1,328,846 1,328,846
166,230 166,230 166,230
1,539,226 1,539,226 1,539,226
1,072,534 1,072,534 1,072,534
64,091 64,091 64,091
126,176 126,176 126,176
298,347 298,347 298,347
298,340 298,340 298,340
479,165 479,165 479,165
126,229 126,229 126,229
126,229 126,229 126,229
298,347 298,347 298,347
298,347 298,347 298,347
479,165 479,165 479,165
477,926 477,926 477,926
778,450 778,450 778,450
1,250,248 1,250,248 1,250,248
77,179 77,179 77,179
399,293 399,293 399,293
450,711 450,711 450,711
1,246,055 1,246,055 1,246,055
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
73,037 72,906 73,342
361,612 361,612 361,612
55,239 55,239 55,239
78,276 78,276 78,276
113,126 113,126 113,126
173,731 173,731 173,731
279,531 279,531 279,531
403,862 403,862 403,862
511,606 511,606 511,606
672,875 672,875 672,875
926,773 926,773 926,773

771,786 759,048 801,510


744,502 735,329 765,905

806,677 798,184 826,492

922,169 906,246 959,323

1,062,864 1,049,947 1,093,003

940,165 928,488 967,411


1,061,340 1,055,487 1,075,000
1,583,005 1,565,586 1,623,655
2,248,194 2,214,473 2,326,875
3,019,274 2,963,221 3,150,064
2,012,019 2,012,019 2,012,019
4,274,179 4,274,179 4,274,179
148,112 147,737 148,985

81,079 80,397 82,672


96,055 95,373 97,648
69,022 66,748 74,327
73,961 71,732 79,163
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
73,962 71,804 78,998
281,885 281,511 282,759
20,129 19,856 20,765
49,159 47,557 52,898
91,373 91,173 91,840
616,618 611,622 628,278
71,149 70,292 73,148
102,973 102,116 104,972
38,975 38,083 41,055
64,597 62,792 68,808
110,155 107,766 115,398
67,278 66,760 68,488

225,781 224,719 228,258


739,405 737,918 742,872
235,002 234,780 235,521
180,411 179,137 183,383
182,279 181,005 185,251
214,070 212,736 217,184
63,756 63,233 64,975
75,810 75,225 77,175
343,778 343,647 344,083
907,055 906,418 908,541
3,732,948 3,732,523 3,733,938
3,840,340 3,839,915 3,841,330
537,449 537,004 538,487
716,652 714,873 720,804
588,519 588,519 588,519
271,761 271,124 273,247
635,718 635,392 636,480
7,106,241 7,103,057 7,113,672

4,456 4,456 4,456


46,973 46,973 46,973
345,087 344,900 345,524
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
543,968 543,079 546,044
254,602 254,415 255,039
270,714 270,527 271,151
282,916 282,729 283,353
14,777 14,777 14,777
15,799 15,799 15,799
129,560 129,560 129,560
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
SPECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548


36,610 36,610 36,610
8,749 8,749 8,749
14,967 14,967 14,967
13,068 13,068 13,068
7,499 7,499 7,499
481 481 481
12,832 12,832 12,832

20,948 20,948 20,948

66,587 66,587 66,587

81,361 81,361 81,361

19,035 19,035 19,035

39,738 39,738 39,738

31,203 31,203 31,203


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí

53,644 53,644 53,644

5,366 5,366 5,366


150,769 131,921 191,890
163,922 145,075 205,044
139,125 139,125 139,125
3,511 3,511 3,511
1,187 1,187 1,187
255,842 251,738 265,418
77,682 76,380 80,721
656,657 648,419 722,557
570,379 560,494 621,452
609,232 599,347 660,304
592,129 582,244 643,202
330,987 338,371 303,344
328,248 309,401 369,370
313,394 294,546 354,515
41,661 41,661 41,661
187,187 187,187 187,187
147,369 128,522 125,095
13,522 13,234 14,194
5,579 5,435 5,915
762,194 742,044 809,212

801,275 780,223 850,398

827,170 805,529 877,666

7,357 7,357 7,357


141,709 119,962 170,705

1,049,254 1,026,397 1,102,587


919,161 896,684 971,611
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
970,061 946,693 1,024,587
689,331 668,573 737,768
790,203 768,622 840,558
689,321 667,878 739,356
790,193 767,900 842,209
848,352 826,909 898,387
712,948 690,655 764,963
896,447 874,155 948,463
12,403 12,403 12,403

16,090 16,090 16,090


1,887 1,887 1,887
2,872,867 2,872,867 2,872,867

4,420,132 4,381,034 4,511,359


1,856,631 1,835,400 1,906,170
94,701 94,701 94,701
389,883 387,335 395,827
448,899 448,899 448,899
18,299 18,299 18,299
650,543 616,641 688,878
196,187 174,440 225,183
91,332 73,934 65,755
500,004 477,543 552,414
451,542 430,291 493,221
460,185 438,934 501,864
465,355 444,454 506,214
473,998 453,097 514,857
635,535 613,665 686,567
734,525 711,788 787,577
232,943 212,184 260,621
237,542 216,783 265,220
49,711 48,369 52,844
20,112 19,441 21,679
10,926 10,926 10,926
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
15,673 15,673 15,673
21,171 21,171 21,171
25,424 25,424 25,424

32,733 32,733 32,733

7,841 7,841 7,841

8,958 8,958 8,958

9,317 9,317 9,317

6,591 6,591 6,591

10,009 10,009 10,009

8,133 8,133 8,133

10,009 10,009 10,009

19,378 19,378 19,378

689,636 689,345 690,315


415,689 410,867 426,941
966,611 966,611 966,611
213,719 195,597 192,302
4,827 4,827 4,827
94,282 94,282 94,282
143,750 143,750 143,750
652,745 630,008 705,797
249,292 228,534 276,970
74,443 74,443 74,443

4,456 4,456 4,456


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)

ROVINCIA: RIONEGRO
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Topaipí Villa_Gomez Yacopí
46,973 46,973 46,973
91,934 91,934 91,934
76,385 76,385 76,385
164,876 163,868 167,228
14,777 14,777 14,777

859 859 859


131,984 131,984 131,984

25,566 25,566 25,566


8,310 8,310 8,310
448,890 448,890 448,890
1,804 1,804 1,804
16,717 16,717 16,717
27,258 27,258 27,258
10,044 10,044 10,044

DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,955,579 1,960,077 1,950,440 1,962,004 1,956,221 1,957,506
1.2 CAMPAMENTO 9 M2 UN ### 1,143,539 1,145,788 1,140,970 1,146,752 1,143,861 1,144,503
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,043 14,043 14,043 14,043 14,043 14,043
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,742 15,742 15,742 15,742 15,742 15,742
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,211 18,211 18,211 18,211 18,211 18,211
1.6 CERCA EN TABLA H=2.30 M ML ### 64,881 64,881 64,881 64,881 64,881 64,881
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 45,349 45,398 45,293 45,419 45,356 45,370
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 20,923 20,972 20,867 20,993 20,930 20,944
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 888,355 889,045 887,793 889,057 888,624 889,063
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,298 10,298 10,298 10,298 10,298 10,298
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,710 3,710 3,710 3,710 3,710 3,710
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,651,638 2,651,638 2,651,638 2,651,638 2,651,638 2,651,638
1.44 RED TELEFÓNICA PROVISIONAL UN ### 245,773 245,773 245,773 245,773 245,773 245,773
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 71,913 77,098 73,671 73,671 77,098 82,238
2.2 BASE ARENA CEMENTO 1:20 M3 ### 146,359 148,973 143,370 150,094 146,732 147,479
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 21,891 21,891 21,891 21,891 21,891 21,891
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 607,499 612,314 601,996 614,378 608,187 609,563
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 608,755 613,757 603,037 615,901 609,470 610,898
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 567,132 571,817 561,778 573,824 567,802 569,140
2.9 PILOTE DE MADERA D=20 CM ML ### 49,563 49,563 49,563 49,563 49,563 49,563
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM) ML ### 152,832 152,832 152,832 152,832 152,832 152,832
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.11 DISTANCIA MENOR DE 5 KM) ML ### 190,243 190,243 190,243 190,243 190,243 190,243
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.12 DISTANCIA MENOR DE 5 KM) ML ### 235,484 235,484 235,484 235,484 235,484 235,484
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 DISTANCIA MENOR DE 5 KM) ML ### 296,385 296,385 296,385 296,385 296,385 296,385
2.14 PILOTE HINCADO 25X25 ML ### 102,293 102,635 101,902 102,782 102,342 102,440
2.15 PILOTE HINCADO 30X30 ML ### 125,672 126,168 125,105 126,380 125,743 125,885
2.16 DADOS EN CONCRETO 3500PSI M3 ### 552,983 557,667 547,629 559,675 553,652 554,990
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 91,424 91,424 91,424 91,424 91,424 91,424

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 37,694 37,711 37,676 37,718 37,697 37,701
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
3.2 SIFÓN EN PVC 6" UN ###
i 195,220 195,237 195,202 195,244 195,223 195,227
p
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### i 431,257 434,483 429,458 433,506 433,134 436,061
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### o 219,268 219,949 218,650 220,042 219,485 219,849
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 247,046 248,116 246,073 248,262 247,386 247,958
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 321,840 323,500 320,193 323,899 322,265 323,005
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 104,181 104,201 104,181 104,181 104,201 104,230
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,265,613 1,265,812 1,265,613 1,265,613 1,265,812 1,266,111
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 111,047 111,227 110,842 111,304 111,073 111,124
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 70,281 70,376 70,173 70,417 70,295 70,322
3.11 TUBERÍA DRENAJE PVC 110 ML ### 27,330 27,422 27,226 27,461 27,344 27,370
3.12 TUBERÍA DRENAJE PVC 160 ML ### 44,112 44,204 44,008 44,243 44,125 44,151
3.13 TUBERÍA DRENAJE PVC 200 ML ### 57,823 57,951 57,677 58,006 57,842 57,878
3.14 TUBERÍA DRENAJE PVC 250 ML ### 79,163 79,309 78,996 79,372 79,184 79,226
3.15 TUBERÍA DRENAJE PVC 315 ML ### 109,674 109,802 109,528 109,857 109,693 109,729
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 940,208 941,671 938,536 942,298 940,417 940,835

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3.17 FILTRANTE)
UN ### 1,325,635 1,328,561 1,322,291 1,329,815 1,326,053 1,326,889

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL


3.18 FILTRANTE) UN ### 1,719,594 1,725,446 1,712,906 1,727,954 1,720,430 1,722,102

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 41,776 41,776 41,776 41,776 41,776 41,776
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 55,095 55,095 55,095 55,095 55,095 55,095
4.3 COLUMNAS 3500 PSI M3 ### 771,989 776,673 766,635 778,681 772,658 773,996
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 228,626 235,024 223,464 233,826 231,152 230,771
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI M2 ### 94,677 95,132 94,157 95,327 94,742 94,872
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 111,550 112,096 110,927 112,330 111,628 111,784
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 124,238 124,966 123,407 125,278 124,342 124,550
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 131,044 131,817 130,160 132,148 131,154 131,375
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 149,659 150,614 148,567 151,023 149,795 150,068
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 166,252 167,344 165,005 167,811 166,408 166,720
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 184,410 185,638 183,007 186,164 184,586 184,936
4.12 ENTREPISO VIGUETA PLACA M2 ### 97,838 97,901 97,766 97,928 97,847 97,865
4.13 ESCALERA MACIZA 3500 PSI M3 ### 918,262 922,946 912,908 924,954 918,931 920,269
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ###
i 93,930 93,998 93,852 94,027 93,940 93,959
p
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### i 75,896 76,365 75,361 76,566 75,963 76,097
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### o 85,055 85,628 84,400 85,874 85,137 85,301
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 98,775 99,494 97,954 99,802 98,878 99,083
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 672,270 676,954 666,916 678,962 672,939 674,277
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 48,292 48,437 48,127 48,499 48,313 48,354
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 266,617 268,709 264,225 269,605 266,916 267,513
4.21 ACERO FIGURADO 37000 PSI KG ### 4,141 4,141 4,141 4,141 4,141 4,141
4.22 ACERO FIGURADO 60000 PSI KG ### 4,343 4,343 4,343 4,343 4,343 4,343
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,118 6,118 6,118 6,118 6,118 6,118
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 818,940 823,625 813,586 825,632 819,610 820,948
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 740,600 745,726 734,740 747,923 741,332 742,797
4.26 VIGA AÉREA 3500 PSI M3 ### 812,720 817,404 807,366 819,411 813,389 814,727
4.27 VIGA CINTA 3500 PSI M3 ### 792,633 797,318 787,279 799,325 793,303 794,641
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,002,995 1,007,679 997,641 1,009,687 1,003,664 1,005,002
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 287,085 292,233 281,204 294,439 287,821 289,292

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 28,717 28,830 28,588 28,878 28,733 28,765
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,081 49,194 48,952 49,242 49,097 49,130
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 34,600 34,617 34,582 34,624 34,603 34,607
5.4 ARCOS EN LADRILLO PRENSADO ML ### 162,720 162,753 162,683 162,766 162,725 162,734
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,092 43,236 42,926 43,298 43,112 43,154
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,705 26,773 26,627 26,802 26,715 26,734
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 97,083 97,148 97,009 97,176 97,092 97,111
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 87,343 87,825 86,791 88,032 87,412 87,550
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 90,802 90,802 90,802 90,802 90,802 90,802
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,325 53,325 53,325 53,325 53,325 53,325
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 87,467 87,467 87,467 87,467 87,467 87,467
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,657 51,657 51,657 51,657 51,657 51,657
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 101,294 101,294 101,294 101,294 101,294 101,294
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 59,892 59,892 59,892 59,892 59,892 59,892
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 112,613 112,613 112,613 112,613 112,613 112,613
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 65,552 65,552 65,552 65,552 65,552 65,552
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 39,881 39,913 39,843 39,927 39,885 39,895
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,254 24,270 24,235 24,277 24,256 24,261
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 52,256 52,278 52,231 52,287 52,259 52,265
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ###
i 31,507 31,518 31,495 31,523 31,509 31,512
p
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### i 58,832 58,854 58,807 58,863 58,835 58,841
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### o 35,469 35,480 35,456 35,484 35,470 35,473
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 96,430 96,539 96,306 96,586 96,446 96,477
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 57,294 57,349 57,232 57,372 57,302 57,318
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 36,713 36,735 36,689 36,744 36,717 36,723
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,338 22,348 22,325 22,353 22,339 22,342
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 72,977 73,021 72,928 73,039 72,984 72,996
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,150 44,172 44,125 44,181 44,153 44,159
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 87,043 87,112 86,966 87,141 87,053 87,073
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 52,860 52,894 52,821 52,909 52,865 52,875
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 177,715 177,867 177,541 177,932 177,737 177,780
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 107,251 107,327 107,164 107,360 107,262 107,284
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 87,689 87,757 87,612 87,786 87,699 87,719
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 53,183 53,217 53,144 53,232 53,188 53,198
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 45,715 45,764 45,659 45,785 45,722 45,736
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 27,956 27,980 27,928 27,991 27,960 27,967
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 33,216 33,238 33,191 33,247 33,219 33,225
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,314 20,325 20,301 20,329 20,315 20,318
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 49,886 49,930 49,836 49,948 49,892 49,905
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 30,724 30,746 30,699 30,755 30,727 30,733
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 96,518 96,583 96,443 96,611 96,527 96,546
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 59,007 59,040 58,970 59,054 59,012 59,021
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 70,629 70,673 70,580 70,692 70,636 70,648
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 42,792 42,813 42,767 42,823 42,795 42,801
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 147,291 147,444 147,117 147,509 147,313 147,357
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 90,031 90,107 89,943 90,139 90,041 90,063
5.47 REMATES LADRILLO PRENSADO ML ### 31,305 31,322 31,287 31,329 31,308 31,312
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 35,146 35,195 35,091 35,216 35,153 35,167
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 59,749 59,814 59,675 59,842 59,758 59,777
5.50 LAVADA DE FACHADA M2 ### 5,242 5,242 5,242 5,242 5,242 5,242
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,441 49,554 49,312 49,602 49,457 49,490
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,592 10,592 10,592 10,592 10,592 10,592
5.53 ANCLAJE 3/8" L=30CM UN ### 13,937 13,937 13,937 13,937 13,937 13,937
5.54 ANCLAJE 1/2" L=50CM UN ### 18,196 18,196 18,196 18,196 18,196 18,196
5.55 ANCLAJE 5/8" L=70CM UN ### 25,375 25,375 25,375 25,375 25,375 25,375
5.56 ANCLAJE 3/4" L=70CM UN ### 37,707 37,707 37,707 37,707 37,707 37,707
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
5.57 ANCLAJE 1" L= 70CM UN ###
i 4,688 4,722 4,648 4,737 4,693 4,703
p
i
6 PAÑETES, REVOQUES Y REPELLOS o
6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,113 16,113 16,113 16,113 16,113 16,113
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,435 5,451 5,416 5,458 5,437 5,442
6.3 FILOS O DILATACIONES S/MURO ML ### 6,621 6,637 6,602 6,644 6,623 6,628
6.4 GOTERA EN MORTERO 1:4 ML ### 7,886 7,903 7,868 7,910 7,889 7,893
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,783 6,783 6,783 6,783 6,783 6,783
6.6 MALLA BAJO ENTRAMADO M2 ### 13,649 13,649 13,649 13,649 13,649 13,649
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 23,192 23,240 23,138 23,260 23,199 23,213
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,190 14,214 14,163 14,224 14,194 14,200
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 20,189 20,235 20,137 20,254 20,196 20,209
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,378 12,401 12,352 12,411 12,382 12,388
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 19,301 19,349 19,247 19,369 19,308 19,322
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 11,935 11,958 11,907 11,968 11,938 11,945
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 20,189 20,235 20,137 20,254 20,196 20,209
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,378 12,401 12,352 12,411 12,382 12,388
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 20,758 20,791 20,719 20,806 20,763 20,772
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 12,662 12,678 12,642 12,686 12,664 12,669
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 16,864 16,899 16,825 16,914 16,869 16,879
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,428 10,445 10,408 10,452 10,430 10,435
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,188 16,224 16,147 16,240 16,193 16,204
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,089 10,108 10,069 10,115 10,092 10,097
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 20,967 21,013 20,915 21,033 20,974 20,987
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 12,747 12,770 12,721 12,780 12,751 12,757
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 20,080 20,127 20,025 20,147 20,086 20,100
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,304 12,327 12,277 12,338 12,307 12,314
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 16,798 16,835 16,757 16,850 16,804 16,814
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,377 10,395 10,356 10,403 10,379 10,385
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 20,969 21,016 20,915 21,037 20,976 20,989
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,153 13,176 13,126 13,186 13,156 13,163

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 25,506 25,572 25,432 25,600 25,516 25,534
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7.2 TELA IMPERMEABLE) M2 ### 80,958 81,199 80,682 81,303 80,992 81,061
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 54,800 54,800 54,800 54,800 54,800 54,800
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ###
i 21,970 21,970 21,970 21,970 21,970 21,970
p
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### i 34,451 34,451 34,451 34,451 34,451 34,451
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### o 79,961 79,961 79,961 79,961 79,961 79,961
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 62,698 62,698 62,698 62,698 62,698 62,698
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 36,626 36,626 36,626 36,626 36,626 36,626
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 83,784 83,784 83,784 83,784 83,784 83,784
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 99,972 99,972 99,972 99,972 99,972 99,972
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 146,739 146,739 146,739 146,739 146,739 146,739
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 58,252 58,252 58,252 58,252 58,252 58,252
7.13 CANAL PVC AMAZONAS ML ### 81,099 81,099 81,099 81,099 81,099 81,099
7.14 CANAL PVC RAINGO ML ### 73,799 73,799 73,799 73,799 73,799 73,799
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 130,313 130,313 130,313 130,313 130,313 130,313
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 76,015 76,015 76,015 76,015 76,015 76,015
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 55,922 55,922 55,922 55,922 55,922 55,922
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,174 32,174 32,174 32,174 32,174 32,174
7.19 TEJA DE BARRO M2 ### 57,501 57,582 57,408 57,617 57,513 57,536
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 46,607 46,607 46,607 46,607 46,607 46,607
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 42,748 42,748 42,748 42,748 42,748 42,748
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,299 36,299 36,299 36,299 36,299 36,299
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 35,521 35,521 35,521 35,521 35,521 35,521
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 35,787 35,787 35,787 35,787 35,787 35,787
7.25 TEJA TERMOACÚSTICA M2 ### 50,170 50,170 50,170 50,170 50,170 50,170
7.26 TEJA PLÁSTICA No.6 M2 ### 44,156 44,156 44,156 44,156 44,156 44,156
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 80,537 80,537 80,537 80,537 80,537 80,537
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 148,369 148,369 148,369 148,369 148,369 148,369
7.29 TEJA SIN TRASLAPO M2 ### 66,828 66,828 66,828 66,828 66,828 66,828
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,463 42,463 42,463 42,463 42,463 42,463
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,181 33,181 33,181 33,181 33,181 33,181
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM) M2 ### 57,478 57,478 57,478 57,478 57,478 57,478
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 19,991 19,991 19,991 19,991 19,991 19,991
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 23,971 23,971 23,971 23,971 23,971 23,971
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 25,913 25,913 25,913 25,913 25,913 25,913
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,260 33,260 33,260 33,260 33,260 33,260
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,054 22,054 22,054 22,054 22,054 22,054
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 51,870 51,870 51,870 51,870 51,870 51,870
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 350,798 350,798 350,798 350,798 350,798 350,798
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ###
i 407,970 407,970 407,970 407,970 407,970 407,970
p
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### i 267,955 267,955 267,955 267,955 267,955 267,955
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### o 285,904 285,904 285,904 285,904 285,904 285,904

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 418,538 423,498 412,870 425,623 419,246 420,664
8.2 CONCRETO 3500 PSI M3 ### 364,272 368,820 359,074 370,769 364,922 366,221
8.3 CONCRETO 3000 PSI M3 ### 361,719 366,394 356,376 368,398 362,387 363,723
8.4 CONCRETO 2500 PSI M3 ### 317,783 322,609 312,268 324,677 318,473 319,851
8.5 CONCRETO 2000 PSI M3 ### 293,886 298,800 288,271 300,906 294,588 295,992
8.6 CONCRETO 1500 PSI M3 ### 263,613 268,611 257,903 270,752 264,327 265,755
8.7 MORTERO SECO 1:10 M3 ### 195,537 197,778 192,976 198,739 195,857 196,498
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 405,523 407,699 403,036 408,632 405,834 406,456
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 363,252 365,510 360,672 366,477 363,575 364,220
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 426,434 428,545 424,021 429,450 426,735 427,339
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 648,854 650,965 646,441 651,870 649,155 649,759

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 122,127 122,127 122,127 122,127 122,127 122,127
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,648 3,664 3,629 3,671 3,650 3,655
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 136,943 136,943 136,943 136,943 136,943 136,943
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 167,390 167,390 167,390 167,390 167,390 167,390
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 242,122 242,122 242,122 242,122 242,122 242,122
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 269,413 269,413 269,413 269,413 269,413 269,413
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 296,737 296,737 296,737 296,737 296,737 296,737
9.8 HOJA PUERTA FORTEC 0.81 UN ### 196,889 196,889 196,889 196,889 196,889 196,889
9.9 HOJA PUERTA FORTEC 0.91 UN ### 223,154 223,154 223,154 223,154 223,154 223,154
9.10 HOJA PUERTA FORTEC 1.50 UN ### 328,214 328,214 328,214 328,214 328,214 328,214
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 124,659 124,659 124,659 124,659 124,659 124,659
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 165,370 165,370 165,370 165,370 165,370 165,370
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 183,756 183,756 183,756 183,756 183,756 183,756
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 467,421 467,421 467,421 467,421 467,421 467,421
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 41,826 41,826 41,826 41,826 41,826 41,826
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,215 26,215 26,215 26,215 26,215 26,215
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 98,909 98,909 98,909 98,909 98,909 98,909
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 119,680 119,680 119,680 119,680 119,680 119,680
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,021 93,021 93,021 93,021 93,021 93,021
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ###
i 28,986 28,986 28,986 28,986 28,986 28,986
p
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### i 28,986 28,986 28,986 28,986 28,986 28,986
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### o 27,489 27,489 27,489 27,489 27,489 27,489
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,100 42,100 42,100 42,100 42,100 42,100
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,049 52,049 52,049 52,049 52,049 52,049
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 62,660 62,660 62,660 62,660 62,660 62,660
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,261 75,261 75,261 75,261 75,261 75,261
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 353,388 353,388 353,388 353,388 353,388 353,388
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 247,277 247,277 247,277 247,277 247,277 247,277
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,479 33,479 33,479 33,479 33,479 33,479
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 42,764 42,764 42,764 42,764 42,764 42,764
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,049 52,049 52,049 52,049 52,049 52,049
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,312 65,312 65,312 65,312 65,312 65,312

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 75,514 75,514 75,514 75,514 75,514 75,514
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 208,895 208,895 208,895 208,895 208,895 208,895
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO) ML ### 80,128 80,128 80,128 80,128 80,128 80,128
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,033 144,033 144,033 144,033 144,033 144,033
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 135,659 135,659 135,659 135,659 135,659 135,659
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,083 89,083 89,083 89,083 89,083 89,083
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 209,609 209,609 209,609 209,609 209,609 209,609
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 109,383 109,383 109,383 109,383 109,383 109,383
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,574 6,574 6,574 6,574 6,574 6,574
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 99,448 99,448 99,448 99,448 99,448 99,448
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00
10,10(1) MTS M2 ### 119,916 119,916 119,916 119,916 119,916 119,916
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 40,926 40,926 40,926 40,926 40,926 40,926
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 532,173 532,173 532,173 532,173 532,173 532,173
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 191,779 191,779 191,779 191,779 191,779 191,779
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 215,936 215,936 215,936 215,936 215,936 215,936
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS) M2 ### 485,671 485,671 485,671 485,671 485,671 485,671
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 128,111 128,111 128,111 128,111 128,111 128,111
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 387,884 387,884 387,884 387,884 387,884 387,884
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ###
i 6,001 6,001 6,001 6,001 6,001 6,001
p
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### i 273,264 273,264 273,264 273,264 273,264 273,264
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### o 121,815 121,815 121,815 121,815 121,815 121,815
10.21 REJILLA PISO 0.30 M M2 ### 85,540 85,540 85,540 85,540 85,540 85,540
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 88,408 88,408 88,408 88,408 88,408 88,408
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,555 10,555 10,555 10,555 10,555 10,555
SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,694 11,694 11,694 11,694 11,694 11,694
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,329 9,329 9,329 9,329 9,329 9,329
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 220,466 220,466 220,466 220,466 220,466 220,466
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 265,282 265,282 265,282 265,282 265,282 265,282
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 21,970 21,970 21,970 21,970 21,970 21,970
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 34,451 34,451 34,451 34,451 34,451 34,451
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,124 33,124 33,124 33,124 33,124 33,124
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 42,397 42,397 42,397 42,397 42,397 42,397
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 87,218 87,218 87,218 87,218 87,218 87,218
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 221,806 221,806 221,806 221,806 221,806 221,806
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,270 44,270 44,270 44,270 44,270 44,270
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 34,983 34,983 34,983 34,983 34,983 34,983
11.13 NIPLE PASAMURO 2" UN ### 66,782 66,782 66,782 66,782 66,782 66,782
11.14 NIPLE PASAMURO 4" UN ### 99,718 99,718 99,718 99,718 99,718 99,718
11.15 PUNTO AGUA CALIENTE CPVC UN ### 83,917 83,917 83,917 83,917 83,917 83,917
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 61,538 61,538 61,538 61,538 61,538 61,538
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 65,381 65,381 65,381 65,381 65,381 65,381
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 82,602 82,602 82,602 82,602 82,602 82,602
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 66,367 66,367 66,367 66,367 66,367 66,367
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 82,775 82,775 82,775 82,775 82,775 82,775
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ###
i 88,459 88,459 88,459 88,459 88,459 88,459
p
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### i 73,025 73,025 73,025 73,025 73,025 73,025
11.23 RED SUMINISTRO CPVC 1/2" ML ### o 12,404 12,404 12,404 12,404 12,404 12,404
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,412 17,412 17,412 17,412 17,412 17,412
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 22,744 22,744 22,744 22,744 22,744 22,744
11.26 RED SUMINISTRO PVC 1" ML ### 14,081 14,081 14,081 14,081 14,081 14,081
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,434 8,434 8,434 8,434 8,434 8,434
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 50,533 50,533 50,533 50,533 50,533 50,533
11.29 RED SUMINISTRO PVC 2" ML ### 32,368 32,368 32,368 32,368 32,368 32,368
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,546 10,546 10,546 10,546 10,546 10,546
11.31 RED SANITARIA PVC-S 2" ML ### 25,051 25,051 25,051 25,051 25,051 25,051
11.32 RED SANITARIA PVC-S 3" ML ### 34,716 34,716 34,716 34,716 34,716 34,716
11.33 RED SANITARIA PVC-S 4" ML ### 47,084 47,084 47,084 47,084 47,084 47,084
11.34 RED SANITARIA PVC-S 6" ML ### 87,737 87,737 87,737 87,737 87,737 87,737
11.35 REGISTRO 1" UN ### 106,802 106,802 106,802 106,802 106,802 106,802
11.36 REGISTRO 1/2" UN ### 59,582 59,582 59,582 59,582 59,582 59,582
11.37 REGISTRO 3/4" UN ### 75,762 75,762 75,762 75,762 75,762 75,762
11.38 REGISTRO 1 1/2" UN ### 182,710 182,710 182,710 182,710 182,710 182,710
11.39 REGISTRO 2 1/2" UN ### 376,293 376,293 376,293 376,293 376,293 376,293
11.40 REGISTRO 2" UN ### 278,213 278,213 278,213 278,213 278,213 278,213
11.41 REVENTILACIÓN 2" ML ### 17,495 17,495 17,495 17,495 17,495 17,495
11.42 REVENTILACIÓN 3" ML ### 22,069 22,069 22,069 22,069 22,069 22,069
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 171,597 171,597 171,597 171,597 171,597 171,597

11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 278,876 278,876 278,876 278,876 278,876 278,876

11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 463,753 463,753 463,753 463,753 463,753 463,753

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11.46 SOPORTES)
ML ### 40,104 40,104 40,104 40,104 40,104 40,104

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.47 SOPORTES) ML ### 47,269 47,269 47,269 47,269 47,269 47,269

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.48 SOPORTES) ML ### 60,843 60,843 60,843 60,843 60,843 60,843

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.49 SOPORTES) ML ### 68,808 68,808 68,808 68,808 68,808 68,808
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y
11.50 SOPORTES)
ML ### p 88,634 88,634 88,634 88,634 88,634 88,634
i
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11.51 ML ### o 102,999 102,999 102,999 102,999 102,999 102,999
SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
11.52 SOPORTES) ML ### 152,470 152,470 152,470 152,470 152,470 152,470
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 61,556 61,556 61,556 61,556 61,556 61,556
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 61,805 61,805 61,805 61,805 61,805 61,805
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 39,718 39,718 39,718 39,718 39,718 39,718
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 48,858 48,858 48,858 48,858 48,858 48,858
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,129 4,129 4,129 4,129 4,129 4,129
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,496 6,496 6,496 6,496 6,496 6,496
11.59 GABINETE TIPO III UN ### 1,005,145 1,005,145 1,005,145 1,005,145 1,005,145 1,005,145
11.60 GABINETE TIPO I UN ### 769,020 769,020 769,020 769,020 769,020 769,020
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,572,956 2,572,956 2,572,956 2,572,956 2,572,956 2,572,956
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,145,799 2,145,799 2,145,799 2,145,799 2,145,799 2,145,799
11.63 VÁLVULA MARIPOSA 3" UN ### 625,891 625,891 625,891 625,891 625,891 625,891
11.64 VÁLVULA MARIPOSA 4" UN ### 808,697 808,697 808,697 808,697 808,697 808,697
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 310,105 310,105 310,105 310,105 310,105 310,105

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 360,004 360,004 360,004 360,004 360,004 360,004
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 57,194 57,194 57,194 57,194 57,194 57,194
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 67,650 67,650 67,650 67,650 67,650 67,650
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 75,181 75,181 75,181 75,181 75,181 75,181
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 88,475 88,475 88,475 88,475 88,475 88,475
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 53,802 53,802 53,802 53,802 53,802 53,802
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,297 61,297 61,297 61,297 61,297 61,297
12.8 STRIP TELEFÓNICO 10 PARES UN ### 141,896 141,896 141,896 141,896 141,896 141,896
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 55,224 55,224 55,224 55,224 55,224 55,224
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 126,830 126,830 126,830 126,830 126,830 126,830
12.11 SALIDA T.V PVC COMPLETA. UN ### 75,914 75,914 75,914 75,914 75,914 75,914
12.12 SALIDA BIFÁSICA C.N. UN ### 45,005 45,005 45,005 45,005 45,005 45,005
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,038 95,038 95,038 95,038 95,038 95,038
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 405,964 405,964 405,964 405,964 405,964 405,964
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 540,377 540,377 540,377 540,377 540,377 540,377
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,497 3,497 3,497 3,497 3,497 3,497
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
12.17 TUBERÍA PVC CONDUIT 3/4" ML ###
i 4,621 4,621 4,621 4,621 4,621 4,621
p
12.18 TUBERÍA PVC CONDUIT 1" ML ### i 7,183 7,183 7,183 7,183 7,183 7,183
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### o 12,853 12,853 12,853 12,853 12,853 12,853
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 269,881 269,881 269,881 269,881 269,881 269,881
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,377 76,377 76,377 76,377 76,377 76,377
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 103,191 103,191 103,191 103,191 103,191 103,191
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,453 42,453 42,453 42,453 42,453 42,453
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,386,468 1,386,468 1,386,468 1,386,468 1,386,468 1,386,468
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,027,690 1,027,690 1,027,690 1,027,690 1,027,690 1,027,690
12.26 POSTE METÁLICO 6M UN ### 1,279,036 1,279,036 1,279,036 1,279,036 1,279,036 1,279,036
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 594,089 594,089 594,089 594,089 594,089 594,089
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 108,904 108,904 108,904 108,904 108,904 108,904
12.29 LUMINARIA 70W SODIO UN ### 498,312 498,312 498,312 498,312 498,312 498,312
12.30 LUMINARIA 150W SODIO UN ### 623,238 623,238 623,238 623,238 623,238 623,238
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,644,905 1,644,905 1,644,905 1,644,905 1,644,905 1,644,905
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,211,529 1,211,529 1,211,529 1,211,529 1,211,529 1,211,529

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 37,855 37,937 37,763 37,971 37,867 37,890
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 37,426 37,508 37,334 37,542 37,438 37,461
13.3 ALISTADO PARA LISTÓN M2 ### 14,382 14,398 14,363 14,405 14,384 14,389
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 24,437 24,599 24,251 24,669 24,460 24,506
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 80,798 80,960 80,612 81,030 80,821 80,868
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,115 26,213 26,003 26,255 26,129 26,157
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 54,492 54,975 53,941 55,182 54,561 54,699
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 74,765 75,537 73,883 75,868 74,875 75,096
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,218 30,218 30,218 30,218 30,218 30,218
13.10 PEGANTE MORTERO-CONCRETO M2 ### 22,993 22,993 22,993 22,993 22,993 22,993
13.11 PERMA PLY 2 CAPAS M2 ### 27,032 27,032 27,032 27,032 27,032 27,032
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 44,052 44,486 43,556 44,673 44,114 44,238
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 51,449 51,980 50,843 52,208 51,525 51,677
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 74,169 74,990 73,232 75,341 74,286 74,521
13.15 TRITURADO FINO 1/2 M3 ### 75,896 79,286 72,021 80,740 76,380 77,349
13.16 TRITURADO GRUESO 3/4 M3 ### 86,846 90,861 83,168 91,444 88,102 90,216

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 56,398 56,431 56,361 56,445 56,403 56,412
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ###
i 33,870 33,887 33,852 33,894 33,873 33,877
p
14.3 ADOQUÍN CONCRETO 6CM M2 ### i 63,546 63,628 63,454 63,662 63,558 63,581
14.4 ADOQUÍN CONCRETO 8CM M2 ### o 66,796 66,878 66,704 66,912 66,808 66,831
14.5 ADOQUÍN GRES PEATONAL M2 ### 71,072 71,153 70,979 71,188 71,083 71,106
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO
M2 ### 74,381 74,414 74,344 74,428 74,386 74,395
14.7 GRAVILLA PARA GRADAS ML ### 37,077 37,129 37,018 37,151 37,085 37,100
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 160,148 160,295 159,981 160,357 160,169 160,211
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 45,416 45,536 45,279 45,587 45,433 45,467
14.10 GUARDAESCOBA EN GRANITO ML ### 44,091 44,091 44,091 44,091 44,091 44,091
14.11 GUARDAESCOBA EN GRAVILLA ML ### 9,778 9,829 9,718 9,852 9,785 9,800
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,330 9,330 9,330 9,330 9,330 9,330
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,511 12,511 12,511 12,511 12,511 12,511
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,547 10,547 10,547 10,547 10,547 10,547
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,580 17,580 17,580 17,580 17,580 17,580
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,127 34,127 34,127 34,127 34,127 34,127
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,320 9,320 9,320 9,320 9,320 9,320
14.18 LISTÓN M.H. AMARILLO M2 ### 74,411 74,411 74,411 74,411 74,411 74,411
14.19 PASO ESCALERA GRANITO ML ### 116,324 116,437 116,194 116,486 116,340 116,372
14.20 PIRLANES ALUMINIO ML ### 7,642 7,642 7,642 7,642 7,642 7,642
14.21 PIRLANES LADRILLO ML ### 31,591 31,624 31,554 31,638 31,596 31,605
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 45,743 45,743 45,743 45,743 45,743 45,743
14.23 PISO VINILO TRÁFICO PESADO M2 ### 53,100 53,100 53,100 53,100 53,100 53,100
14.24 PULIDA LACADA PISO MADERA M2 ### 49,298 49,298 49,298 49,298 49,298 49,298
14.25 TABLETA DE GRES 25X25 M2 ### 48,870 48,902 48,833 48,916 48,875 48,884
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 54,876 54,908 54,839 54,922 54,881 54,890
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,030 11,030 11,030 11,030 11,030 11,030
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 48,659 48,707 48,603 48,728 48,666 48,680
14.29 JABONERA PORCELANA ACUARIO UN ### 20,569 20,569 20,569 20,569 20,569 20,569
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14.30 Y PERCHA SIMPLE) UN ### 122,853 122,853 122,853 122,853 122,853 122,853
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,032 10,032 10,032 10,032 10,032 10,032
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,485 22,485 22,485 22,485 22,485 22,485
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,497 14,497 14,497 14,497 14,497 14,497
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,090 14,090 14,090 14,090 14,090 14,090
14.35 REMATES BOCEL ALUMINIO ML ### 8,638 8,638 8,638 8,638 8,638 8,638
14.36 REMATES BOCEL PORCELANA ML ### 8,786 8,786 8,786 8,786 8,786 8,786
14.37 TAPA REGISTRO 20X20 UN ### 19,080 19,080 19,080 19,080 19,080 19,080
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
14.38 TAPA REGISTRO 6X6 UN ###
i 17,406 17,406 17,406 17,406 17,406 17,406
p
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### i 18,517 18,517 18,517 18,517 18,517 18,517
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO o
14.40 EN SITIO M2 ### 21,406 21,406 21,406 21,406 21,406 21,406
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 64,382 64,415 64,345 64,429 64,387 64,396
14.42 MEDIA CAÑA EN GRANITO ML ### 76,997 76,997 76,997 76,997 76,997 76,997
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,577 34,577 34,577 34,577 34,577 34,577
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,291 13,291 13,291 13,291 13,291 13,291
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 100,932 100,932 100,932 100,932 100,932 100,932
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 122,336 122,336 122,336 122,336 122,336 122,336

15 CIELO RASO
15.1 APLIQUE YESO ML ### 72,371 72,371 72,371 72,371 72,371 72,371
15.2 ARMADURA MADERA Y MALLA M2 ### 36,241 36,241 36,241 36,241 36,241 36,241
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 55,517 55,517 55,517 55,517 55,517 55,517
15.4 CIELO RASO DURACUSTIC M2 ### 67,982 67,982 67,982 67,982 67,982 67,982
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 50,797 50,797 50,797 50,797 50,797 50,797
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 93,914 93,914 93,914 93,914 93,914 93,914
15.7 CORNISAS YESO ML ### 48,539 48,539 48,539 48,539 48,539 48,539
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 103,672 103,672 103,672 103,672 103,672 103,672
15.9 MALLA CON VENA M2 ### 13,555 13,555 13,555 13,555 13,555 13,555

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 49,987 49,987 49,987 49,987 49,987 49,987
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005 85,005
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 73,671 77,098 73,671 73,671 77,098 82,238
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 85,562 89,482 81,081 91,162 86,122 87,241
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 113,952 112,239 141,366 136,226 160,214 122,519
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 61,819 67,004 63,577 63,577 67,004 72,144
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ###
i 106,049 104,335 133,463 128,323 152,311 114,616
p
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### i 110,921 109,208 138,336 133,195 157,183 119,488
o
17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 300,356 300,356 300,356 300,356 300,356 300,356
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 883,171 883,171 883,171 883,171 883,171 883,171
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 479,015 479,015 479,015 479,015 479,015 479,015
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 139,865 139,865 139,865 139,865 139,865 139,865
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 195,164 195,164 195,164 195,164 195,164 195,164
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 181,335 181,335 181,335 181,335 181,335 181,335
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 397,724 397,724 397,724 397,724 397,724 397,724
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,015,470 1,015,470 1,015,470 1,015,470 1,015,470 1,015,470
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 289,248 289,248 289,248 289,248 289,248 289,248
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 205,397 205,397 205,397 205,397 205,397 205,397
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,410 82,410 82,410 82,410 82,410 82,410
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 248,275 248,275 248,275 248,275 248,275 248,275
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 365,155 365,155 365,155 365,155 365,155 365,155

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,357 8,357 8,357 8,357 8,357 8,357
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,089 3,089 3,089 3,089 3,089 3,089
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,176 11,176 11,176 11,176 11,176 11,176
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,223 42,223 42,223 42,223 42,223 42,223
18.5 CARBURO SOBRE PAÑETES M2 ### 5,856 5,856 5,856 5,856 5,856 5,856
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 65,175 65,175 65,175 65,175 65,175 65,175
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,490 3,490 3,490 3,490 3,490 3,490
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,775 2,775 2,775 2,775 2,775 2,775
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 13,964 13,964 13,964 13,964 13,964 13,964
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,039 4,039 4,039 4,039 4,039 4,039
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,722 14,722 14,722 14,722 14,722 14,722
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,723 5,723 5,723 5,723 5,723 5,723
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,521 6,521 6,521 6,521 6,521 6,521
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
18.14 ESTUCO M2 ###
i 7,054 7,054 7,054 7,054 7,054 7,054
p
18.15 ESTUCO (LINEAL) ML ### i 4,422 4,422 4,422 4,422 4,422 4,422
18.16 ESTUCO Y VINILO 3 MANOS M2 ### o 15,555 15,555 15,555 15,555 15,555 15,555
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,656 9,656 9,656 9,656 9,656 9,656
18.18 LACA PISOS MADERA M2 ### 22,870 22,870 22,870 22,870 22,870 22,870
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,695 2,695 2,695 2,695 2,695 2,695
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,140 12,140 12,140 12,140 12,140 12,140
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,278 3,278 3,278 3,278 3,278 3,278
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,612 12,612 12,612 12,612 12,612 12,612
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,098 7,098 7,098 7,098 7,098 7,098
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,470 4,470 4,470 4,470 4,470 4,470
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,762 21,762 21,762 21,762 21,762 21,762
18.26 PINTURA EPÓXICA M2 ### 12,724 12,724 12,724 12,724 12,724 12,724
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,871 7,871 7,871 7,871 7,871 7,871

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,007,320 6,007,320 6,007,320 6,007,320 6,007,320 6,007,320
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR) UN ### 10,614,029 10,614,029 10,614,029 10,614,029 10,614,029 10,614,029
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,777,836 2,777,836 2,777,836 2,777,836 2,777,836 2,777,836
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,077,840 9,077,840 9,077,840 9,077,840 9,077,840 9,077,840
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,500,468 8,500,468 8,500,468 8,500,468 8,500,468 8,500,468
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,695 2,695 2,695 2,695 2,695 2,695
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 853,198 853,198 853,198 853,198 853,198 853,198
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 85,157 85,157 85,157 85,157 85,157 85,157
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,542,645 1,542,695 1,542,589 1,542,716 1,542,652 1,542,667
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 664,346 665,514 663,010 666,015 664,513 664,847

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,266 29,266 29,266 29,266 29,266 29,266
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 43,409 43,409 43,409 43,409 43,409 43,409
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 53,793 53,793 53,793 53,793 53,793 53,793
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 17,590 17,590 17,590 17,590 17,590 17,590
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,290 21,290 21,290 21,290 21,290 21,290
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,004 29,004 29,004 29,004 29,004 29,004
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,085 26,085 26,085 26,085 26,085 26,085
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,495 27,495 27,495 27,495 27,495 27,495
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ###
i 34,355 34,355 34,355 34,355 34,355 34,355
p
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### i 17,528 17,528 17,528 17,528 17,528 17,528
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### o 22,961 22,961 22,961 22,961 22,961 22,961
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,285 35,285 35,285 35,285 35,285 35,285
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 270,203 270,203 270,203 270,203 270,203 270,203
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 310,930 310,930 310,930 310,930 310,930 310,930
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 324,351 324,351 324,351 324,351 324,351 324,351
20.16 ACOMETIDA GAS 1/2" ML ### 301,109 301,109 301,109 301,109 301,109 301,109

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 219,794 219,794 219,794 219,794 219,794 219,794
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 33,641 33,641 33,641 33,641 33,641 33,641
21.3 SIRENA DE 110 V UN ### 102,765 102,765 102,765 102,765 102,765 102,765
21.4 CÁMARA CCTV UN ### 262,193 262,193 262,193 262,193 262,193 262,193
21.5 PARLANTE-CIELO FALSO UN ### 51,797 51,797 51,797 51,797 51,797 51,797
21.6 AMPLIFICADOR 100W UN ### 568,917 568,917 568,917 568,917 568,917 568,917
21.7 AMPLIFICADOR 300W UN ### 1,407,978 1,407,978 1,407,978 1,407,978 1,407,978 1,407,978
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,067 45,067 45,067 45,067 45,067 45,067
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 219,688 219,688 219,688 219,688 219,688 219,688
21.10 TOMA PARA MICRÓFONO UN ### 43,899 43,899 43,899 43,899 43,899 43,899
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,739 3,739 3,739 3,739 3,739 3,739
21.12 SPLITERS UN ### 6,262 6,262 6,262 6,262 6,262 6,262
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,675 18,675 18,675 18,675 18,675 18,675
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,449 24,449 24,449 24,449 24,449 24,449
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 31,714 31,714 31,714 31,714 31,714 31,714
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 121,814 121,814 121,814 121,814 121,814 121,814
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 31,786 31,786 31,786 31,786 31,786 31,786
21.18 BANDEJA PORTACABLES PARA RACK UN ### 103,809 103,809 103,809 103,809 103,809 103,809
21.19 RACK 2' X 24" UN ### 183,475 183,475 183,475 183,475 183,475 183,475
21.20 RACK 3' X 24" UN ### 287,222 287,222 287,222 287,222 287,222 287,222
21.21 RACK 5' X 24" UN ### 357,290 357,290 357,290 357,290 357,290 357,290
21.22 RACK 7' X 24" UN ### 390,121 390,121 390,121 390,121 390,121 390,121
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 572,880 572,880 572,880 572,880 572,880 572,880
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 337,925 337,925 337,925 337,925 337,925 337,925
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 103,256 103,256 103,256 103,256 103,256 103,256
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 13,729 13,729 13,729 13,729 13,729 13,729
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,044 28,044 28,044 28,044 28,044 28,044
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
21.28 CABLE UTP CATEGORÍA 6A ML ###
i 4,983 4,983 4,983 4,983 4,983 4,983
p
21.29 CANALETA METÁLICA 4X6 CMS ML ### i 35,181 35,181 35,181 35,181 35,181 35,181
21.30 CANALETA METÁLICA 4X10 CMS ML ### o 36,745 36,745 36,745 36,745 36,745 36,745
21.31 CANALETA METÁLICA 6X10 CMS ML ### 37,528 37,528 37,528 37,528 37,528 37,528
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,484 24,484 24,484 24,484 24,484 24,484
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,058 27,058 27,058 27,058 27,058 27,058
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,139 28,139 28,139 28,139 28,139 28,139
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 47,150 47,150 47,150 47,150 47,150 47,150
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 608,972 608,972 608,972 608,972 608,972 608,972
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 313,255 313,255 313,255 313,255 313,255 313,255
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 88,454 88,454 88,454 88,454 88,454 88,454
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,832 1,832 1,832 1,832 1,832 1,832
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,449 8,449 8,449 8,449 8,449 8,449
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,571 12,571 12,571 12,571 12,571 12,571
21.42 CABLE TELEFÓNICO 40 PARES ML ### 20,956 20,956 20,956 20,956 20,956 20,956
21.43 CABLE TELEVISIÓN RG6 ML ### 3,894 3,894 3,894 3,894 3,894 3,894
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,421 22,421 22,421 22,421 22,421 22,421
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,544 32,544 32,544 32,544 32,544 32,544
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,353 19,353 19,353 19,353 19,353 19,353
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,313 15,313 15,313 15,313 15,313 15,313
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 613,468 613,468 613,468 613,468 613,468 613,468
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 89,839 89,839 89,839 89,839 89,839 89,839
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 505,242 505,242 505,242 505,242 505,242 505,242
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,078,332 1,078,332 1,078,332 1,078,332 1,078,332 1,078,332
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 123,725 123,725 123,725 123,725 123,725 123,725
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 752,850 752,850 752,850 752,850 752,850 752,850
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,619,742 1,619,742 1,619,742 1,619,742 1,619,742 1,619,742
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,076 13,076 13,076 13,076 13,076 13,076
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,092 16,092 16,092 16,092 16,092 16,092
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,167 20,167 20,167 20,167 20,167 20,167
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,058 22,058 22,058 22,058 22,058 22,058
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,414 26,414 26,414 26,414 26,414 26,414
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,414 26,414 26,414 26,414 26,414 26,414
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 105,691 105,691 105,691 105,691 105,691 105,691
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 122,443 122,443 122,443 122,443 122,443 122,443
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 378,833 378,833 378,833 378,833 378,833 378,833
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 142,226 142,226 142,226 142,226 142,226 142,226
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 234,462 234,462 234,462 234,462 234,462 234,462
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,037,039 1,037,039 1,037,039 1,037,039 1,037,039 1,037,039
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,194,762 1,194,762 1,194,762 1,194,762 1,194,762 1,194,762
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,132 14,132 14,132 14,132 14,132 14,132
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,484 12,484 12,484 12,484 12,484 12,484
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 30,549 30,549 30,549 30,549 30,549 30,549
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 121,538 121,538 121,538 121,538 121,538 121,538
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 180,790 180,790 180,790 180,790 180,790 180,790
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 29,641 29,641 29,641 29,641 29,641 29,641
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 101,955 101,955 101,955 101,955 101,955 101,955
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 150,887 150,887 150,887 150,887 150,887 150,887
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 29,916 29,916 29,916 29,916 29,916 29,916
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 61,635 61,635 61,635 61,635 61,635 61,635
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 247,835 247,835 247,835 247,835 247,835 247,835
1.32 UNIÓN REPARACION PVC 4" UN ### 71,880 71,880 71,880 71,880 71,880 71,880
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 288,283 288,283 288,283 288,283 288,283 288,283
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 173,323 173,323 173,323 173,323 173,323 173,323
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 491,989 491,989 491,989 491,989 491,989 491,989
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ###
i 1,316,137 1,316,137 1,316,137 1,316,137 1,316,137 1,316,137
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 1,944,666 1,944,666 1,944,666 1,944,666 1,944,666 1,944,666
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,757 10,757 10,757 10,757 10,757 10,757
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,609 24,609 24,609 24,609 24,609 24,609
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 67,321 71,063 63,044 72,667 67,855 68,924
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 68,637 72,064 68,637 68,637 72,064 77,204
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 66,878 72,064 68,637 68,637 72,064 77,204
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 51,874 63,507 52,899 59,048 62,122 59,048
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 59,013 67,371 54,834 61,103 64,237 61,103
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 51,582 53,694 49,170 54,598 51,884 52,487

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 112,975 112,975 112,975 112,975 112,975 112,975
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,176,864 1,176,864 1,176,864 1,176,864 1,176,864 1,176,864
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 147,605 147,605 147,605 147,605 147,605 147,605
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,363,085 1,363,085 1,363,085 1,363,085 1,363,085 1,363,085
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 950,141 950,141 950,141 950,141 950,141 950,141
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,451 62,451 62,451 62,451 62,451 62,451
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 112,149 112,149 112,149 112,149 112,149 112,149
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 264,705 264,705 264,705 264,705 264,705 264,705
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 264,699 264,699 264,699 264,699 264,699 264,699
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 424,912 424,912 424,912 424,912 424,912 424,912
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 112,196 112,196 112,196 112,196 112,196 112,196
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 112,196 112,196 112,196 112,196 112,196 112,196
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 264,705 264,705 264,705 264,705 264,705 264,705
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 264,705 264,705 264,705 264,705 264,705 264,705
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 424,912 424,912 424,912 424,912 424,912 424,912
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 427,714 427,714 427,714 427,714 427,714 427,714
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 693,728 693,728 693,728 693,728 693,728 693,728
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,113,124 1,113,124 1,113,124 1,113,124 1,113,124 1,113,124
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 68,803 68,803 68,803 68,803 68,803 68,803
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 358,112 358,112 358,112 358,112 358,112 358,112
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 400,506 400,506 400,506 400,506 400,506 400,506
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,109,013 1,109,013 1,109,013 1,109,013 1,109,013 1,109,013
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 64,490 64,512 64,465 64,521 64,493 64,499
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 324,757 324,757 324,757 324,757 324,757 324,757
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 49,346 49,346 49,346 49,346 49,346 49,346
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 69,746 69,746 69,746 69,746 69,746 69,746
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 100,600 100,600 100,600 100,600 100,600 100,600
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 154,399 154,399 154,399 154,399 154,399 154,399
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 248,049 248,049 248,049 248,049 248,049 248,049
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 360,507 360,507 360,507 360,507 360,507 360,507
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 456,033 456,033 456,033 456,033 456,033 456,033
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 599,543 599,543 599,543 599,543 599,543 599,543
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 824,284 824,284 824,284 824,284 824,284 824,284

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO) UN ### 645,008 647,813 641,803 649,016 645,409 646,211
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE
4.2 INTERNO E=1.5CM Y CAÑUELA)
ML ### 619,208 620,242 618,026 620,686 619,355 619,651
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.3 (INCLUYE ARO Y TAPA HF) UN ### 693,117 694,987 690,980 695,789 693,384 693,919
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4.4 REFUERZO) UN ### 764,411 767,918 760,404 769,421 764,912 765,914
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE
4.5 INTERNO E=1.5CM Y CAÑUELA) ML ### 878,249 879,705 876,584 880,330 878,456 878,873
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.6 (INCLUYE ARO Y TAPA HF)
UN ### 797,320 799,891 794,381 800,993 797,687 798,422
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 975,450 976,506 974,245 976,955 975,600 975,903
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,400,028 1,403,483 1,396,081 1,404,958 1,400,519 1,401,510
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,907,602 1,915,063 1,899,075 1,918,260 1,908,668 1,910,799
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,520,409 2,532,811 2,506,235 2,538,126 2,522,182 2,525,724
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,807,775 1,807,775 1,807,775 1,807,775 1,807,775 1,807,775
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,819,698 3,819,698 3,819,698 3,819,698 3,819,698 3,819,698
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 136,743 136,785 136,695 136,803 136,749 136,761

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 70,151 70,265 70,022 70,314 70,168 70,200
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 83,463 83,577 83,334 83,626 83,480 83,512
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 52,306 52,813 51,727 53,030 52,379 52,524
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###
i 56,920 57,411 56,359 57,621 56,990 57,130
p
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### i 57,188 57,665 56,642 57,870 57,256 57,392
5.6 BORDE SEPARADOR VERDE A-170 ML ### o 248,587 248,629 248,538 248,647 248,593 248,605
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 17,980 18,041 17,911 18,067 17,989 18,006
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 37,492 37,849 37,084 38,002 37,543 37,645
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 81,806 81,828 81,780 81,838 81,809 81,815
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 539,112 539,869 538,246 540,194 539,220 539,436
5.11 LOSETA PREFABRICADA A-40 M2 ### 59,601 59,697 59,490 59,739 59,615 59,642
5.12 LOSETA PREFABRICADA A-60 M2 ### 87,158 87,254 87,047 87,296 87,171 87,199
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 31,871 32,067 31,647 32,152 31,899 31,955
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 50,694 51,091 50,239 51,261 50,750 50,864
5.15 SARDINEL PREFABRICADO A-10 ML ### 92,543 92,367 95,701 95,162 97,919 93,548
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 58,152 58,210 58,085 58,235 58,160 58,177

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 198,506 198,740 198,239 198,840 198,540 198,606
6.2 BANCA EN CONCRETO M-30 UN ### 653,233 653,560 652,859 653,701 653,280 653,373
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 211,262 211,311 211,205 211,332 211,269 211,283
6.4 BOLARDO M-60 CONCRETO UN ### 158,077 158,357 157,756 158,478 158,117 158,197
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 159,945 160,225 159,624 160,345 159,985 160,065
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 187,521 187,816 187,184 187,942 187,563 187,647
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 56,530 56,617 56,431 56,654 56,542 56,567
6.8 BORDILLO PREFABRICADO A-80 ML ### 65,012 65,109 64,900 65,151 65,026 65,053
6.9 CANECA M-120 UN ### 305,959 305,981 305,934 305,990 305,962 305,968
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 807,445 807,585 807,284 807,645 807,465 807,505
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,311,664 3,311,757 3,311,557 3,311,797 3,311,677 3,311,704
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,406,723 3,406,816 3,406,616 3,406,856 3,406,736 3,406,763
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 476,028 476,126 475,916 476,168 476,042 476,070
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 629,078 629,471 628,629 629,640 629,134 629,247
6.15 BANCA EN MADERA M-50 UN ### 524,692 524,692 524,692 524,692 524,692 524,692
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 243,300 243,440 243,140 243,501 243,320 243,360
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 563,405 563,459 563,343 563,482 563,413 563,428
6.18 POSTE HISTÓRICO M-131 UN ### 6,291,973 6,292,675 6,291,172 6,292,975 6,292,074 6,292,274

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,958 3,958 3,958 3,958 3,958 3,958
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,701 42,701 42,701 42,701 42,701 42,701
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
7.3 SEÑAL DOBLE DE CICLORUTA UN ###
i 307,418 307,440 307,394 307,449 307,421 307,427
p
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### i 484,370 484,567 484,146 484,651 484,398 484,454
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### o 230,843 230,864 230,818 230,873 230,846 230,852
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 245,105 245,126 245,080 245,135 245,108 245,114
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 255,906 255,927 255,881 255,936 255,909 255,915
7.8 TACHAS REFLECTIVAS UN ### 13,327 13,327 13,327 13,327 13,327 13,327
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,227 14,227 14,227 14,227 14,227 14,227
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 115,547 115,547 115,547 115,547 115,547 115,547
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES
1.2 201 P A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO
1.4 200.2 DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.5 201.7 UNA DISTANCIA DE 5KM)
M3 ### 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,
1.6 *** SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,105 35,105 35,105 35,105 35,105 35,105
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832 12,832 12,832

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A


2.9 600.1 UNA DISTANCIA MENOR DE 5 KM) M3 ### 20,948 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A
2.10 600.2 UNA DISTANCIA MENOR DE 5 KM) M3 ### 64,696 64,696 64,696 64,696 64,696 64,696
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 79,470 79,470 79,470 79,470 79,470 79,470
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE
2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,035 19,035 19,035 19,035 19,035 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE
2.13 600.4 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 39,738 39,738 39,738 39,738 39,738 39,738
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO
2.14 600.5 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 31,203 31,203 31,203 31,203 31,203 31,203
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE
2.15 600.5 P M3 ### o 53,644 53,644 53,644 53,644 53,644 53,644
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 106,049 104,335 133,463 128,323 152,311 114,616
3.3 330.1 BASE GRANULAR M3 ### 110,921 109,208 138,336 133,195 157,183 119,488
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO
3.4 365.1 DE ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,162 3,162 3,162 3,162 3,162 3,162
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,106 1,106 1,106 1,106 1,106 1,106
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 216,968 217,978 215,813 218,411 217,112 217,401
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 62,056 62,227 61,861 62,300 62,080 62,129
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 538,904 552,084 540,552 558,674 552,084 542,199
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 545,154 558,334 546,802 564,924 558,334 548,449
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 581,381 594,561 583,028 601,151 594,561 584,676
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 551,404 564,584 553,052 571,174 564,584 554,699
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 358,658 352,385 371,633 350,711 349,933 364,986
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 255,424 253,711 282,838 277,698 301,686 263,991
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 249,548 247,835 276,963 271,823 295,810 258,115
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 37,798 37,798 37,798 37,798 37,798 37,798
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 167,298 167,298 167,298 167,298 167,298 167,298
3.15 311.1 AFIRMADO M3 ### 61,819 67,004 63,577 63,577 67,004 72,144
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,196 11,267 11,115 11,298 11,206 11,227
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,465 4,501 4,425 4,516 4,470 4,481
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3.18 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 599,725 604,216 594,594 606,140 600,367 601,650
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y
3.19 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 629,913 634,606 624,552 636,616 630,584 631,925
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y
3.20 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 650,047 654,874 644,531 656,943 650,737 652,116
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 6,984 6,984 6,984 6,984 6,984 6,984
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 89,196 100,795 83,397 92,096 96,445 92,096
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
4 NORMA INV OBRAS DE ARTE p
4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ###
i 870,349 875,443 864,528 877,626 871,077 872,532
o
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 745,304 750,313 739,579 752,460 746,019 747,451
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 790,067 795,275 784,115 797,506 790,810 792,299
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 531,464 536,058 526,214 538,026 532,121 533,433
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 626,112 630,888 620,654 632,934 626,795 628,159
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 528,886 533,607 523,489 535,631 529,560 530,910
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 623,432 628,340 617,821 630,445 624,133 625,536
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 687,917 692,638 682,520 694,662 688,591 689,941
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 546,907 551,816 541,297 553,920 547,608 549,011
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 730,407 735,316 724,797 737,420 731,108 732,511
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P ACERO A-36 KG ### 11,785 11,785 11,785 11,785 11,785 11,785
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.12 650 P ACERO A-588 GRADO B KG ### 15,078 15,078 15,078 15,078 15,078 15,078
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,772 1,772 1,772 1,772 1,772 1,772
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO
4.14 621.1 TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,650,773 2,650,773 2,650,773 2,650,773 2,650,773 2,650,773
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN
4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,032,725 4,041,439 4,022,768 4,045,173 4,033,970 4,036,460
REFUERZO Y ANILLOS)

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,677,800 1,682,475 1,672,457 1,684,479 1,678,468 1,679,804

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###


U(DM3) 85,613 85,613 85,613 85,613 85,613 85,613
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 352,097 352,658 351,455 352,898 352,177 352,337
4.19 632 P BARANDA METÁLICA ML ### 417,449 417,449 417,449 417,449 417,449 417,449
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,647 16,647 16,647 16,647 16,647 16,647
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 438,195 446,357 433,597 446,378 442,097 446,679
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 64,880 76,948 66,330 75,029 79,378 75,029
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 74,052 77,215 74,052 74,052 77,215 81,960
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 342,543 347,506 336,872 349,633 343,252 344,670
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 338,905 346,071 333,427 344,172 341,962 341,223
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 347,548 354,714 342,070 352,815 350,605 349,866
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 353,243 360,357 347,826 358,434 356,293 355,539
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 361,886 369,000 356,469 367,077 364,936 364,182
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 478,959 483,833 473,389 485,922 479,656 481,048
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ###
i 571,748 576,815 565,957 578,986 572,472 573,919
p
4.31 681.1 GAVIÓN M3 ### i 175,999 187,071 170,464 178,767 182,919 178,767
4.32 681.1 GAVIÓN MALLA PVC M3 ### o 180,070 191,142 174,535 182,838 186,990 182,838
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 39,904 40,204 39,563 40,332 39,947 40,033
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500
4.34 672.1 PSI ML ### 15,112 15,261 14,941 15,325 15,133 15,176
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
4.35 *** (RESISTENCIA ÚLTIMA 25 KN)
M2 ### 9,946 9,946 9,946 9,946 9,946 9,946

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,148 14,148 14,148 14,148 14,148 14,148

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,016 19,016 19,016 19,016 19,016 19,016
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 22,780 22,780 22,780 22,780 22,780 22,780
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 29,251 29,251 29,251 29,251 29,251 29,251
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,
4.40 *** FILTRO Y SEPARACIÓN) M2 ### 7,137 7,137 7,137 7,137 7,137 7,137
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,
4.41 *** FILTRO Y SEPARACIÓN) M2 ### 8,126 8,126 8,126 8,126 8,126 8,126

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN,


4.42 *** FILTRO Y SEPARACIÓN) M2 ### 8,444 8,444 8,444 8,444 8,444 8,444

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO


4.43 *** Y SEPARACIÓN) M2 ### 6,031 6,031 6,031 6,031 6,031 6,031

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO


4.44 *** Y SEPARACIÓN)
M2 ### 9,056 9,056 9,056 9,056 9,056 9,056
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLAN n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO
4.45 *** M2 ### p 7,395 7,395 7,395 7,395 7,395 7,395
Y SEPARACIÓN) i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO o
4.46 *** Y SEPARACIÓN) M2 ### 9,056 9,056 9,056 9,056 9,056 9,056

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN,


4.47 *** FILTRO Y SEPARACIÓN) M2 ### 17,350 17,350 17,350 17,350 17,350 17,350

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36"


4.48 661.1 CLASE I, INCLUYE EMBOQUILLADA
ML ### 617,606 617,675 617,528 617,705 617,616 617,636
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600
4.49 660.3 MM ML ### 346,563 347,588 345,391 348,027 346,709 347,002
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO
4.50 *** 36"
ML ### 864,123 864,123 864,123 864,123 864,123 864,123
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 131,279 136,265 132,970 132,970 136,265 141,208
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,343 4,343 4,343 4,343 4,343 4,343
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4.53 *** INSTALACIÓN) ML ### 84,075 84,075 84,075 84,075 84,075 84,075

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E


4.54 *** INSTALACIÓN) ML ### 128,067 128,067 128,067 128,067 128,067 128,067
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 485,742 490,809 479,951 492,980 486,466 487,913
4.56 682.1 P COLCHONETA RENO M3 ### 191,821 202,892 186,285 194,589 198,740 194,589
4.57 *** TRINCHO EN MADERA M2 ### 66,564 66,564 66,564 66,564 66,564 66,564

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,958 3,958 3,958 3,958 3,958 3,958
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,701 42,701 42,701 42,701 42,701 42,701
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 82,018 82,018 82,018 82,018 82,018 82,018
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 68,255 68,255 68,255 68,255 68,255 68,255
5.5 730.1 DEFENSA METÁLICA ML ### 144,060 144,305 143,780 144,410 144,095 144,165
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,327 13,327 13,327 13,327 13,327 13,327

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 835 835 835 835 835 835
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36",
6.2 801.6 INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN ### 131,984 131,984 131,984 131,984 131,984 131,984
DISTANCIA DE 5 KM
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA:
u SABANA CENTRO
ESTOS PRECIOS CONTEMPLANn SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó
i
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE
6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### p 25,566 25,566 25,566 25,566 25,566 25,566
i
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### o 8,310 8,310 8,310 8,310 8,310 8,310
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 448,890 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804 1,804

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,196 15,196 15,196 15,196 15,196 15,196
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,534 24,534 24,534 24,534 24,534 24,534
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,386 9,386 9,386 9,386 9,386 9,386
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
CONSTRUCCIÓN

1,959,434 1,958,149 1,947,869


1,145,467 1,144,824 1,139,685
14,043 14,043 14,043
15,742 15,742 15,742
18,211 18,211 18,211
64,881 64,881 64,881
45,391 45,377 45,265
20,965 20,951 20,839
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
10,480 10,480 10,480
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
888,278 888,635 887,512
10,298 10,298 10,298
3,710 3,710 3,710
2,651,638 2,651,638 2,651,638
245,773 245,773 245,773
9,189 9,189 9,189

65,104 68,531 73,671


148,600 147,853 141,876
297,878 297,878 297,878
207,425 207,425 207,425
21,891 21,891 21,891
611,627 610,250 599,245
613,043 611,613 600,178
571,148 569,809 559,101
49,563 49,563 49,563
152,832 152,832 152,832

190,243 190,243 190,243

235,484 235,484 235,484

296,385 296,385 296,385


102,586 102,489 101,706
126,097 125,955 124,822
556,999 555,660 544,952
91,424 91,424 91,424

37,708 37,704 37,667


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
195,234 195,230 195,193
428,477 432,157 428,558
219,384 219,578 218,340
247,228 247,532 245,586
322,528 322,663 319,369
104,131 104,181 104,181
1,265,116 1,265,613 1,265,613
111,201 111,150 110,740
70,363 70,336 70,119
27,409 27,383 27,174
44,190 44,164 43,955
57,933 57,896 57,604
79,288 79,247 78,912
109,784 109,748 109,455
941,462 941,044 937,700

1,328,143 1,327,307 1,320,619

1,724,610 1,722,938 1,709,562

41,776 41,776 41,776


55,095 55,095 55,095
776,005 774,666 763,958
229,155 230,789 220,882
95,067 94,937 93,897

112,018 111,862 110,615


124,862 124,654 122,991
131,707 131,486 129,718
150,478 150,205 148,022
167,188 166,876 164,381
185,463 185,112 182,305
97,892 97,874 97,730
922,278 920,939 910,231
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
93,989 93,969 93,813
76,298 76,164 75,093
85,546 85,383 84,073
99,391 99,186 97,543
676,286 674,947 664,239
48,416 48,375 48,044
268,410 267,812 263,030
4,141 4,141 4,141
4,343 4,343 4,343
6,118 6,118 6,118
822,956 821,617 810,909
744,995 743,529 731,811
816,736 815,397 804,689
796,649 795,310 784,602
1,007,011 1,005,672 994,964
291,498 290,027 278,262

28,813 28,781 28,524


49,178 49,146 48,888
34,614 34,610 34,573
162,748 162,739 162,664
43,216 43,174 42,843
26,764 26,744 26,588
97,139 97,120 96,972
87,756 87,618 86,516
90,802 90,802 90,802
53,325 53,325 53,325
87,467 87,467 87,467
51,657 51,657 51,657
101,294 101,294 101,294
59,892 59,892 59,892
112,613 112,613 112,613
65,552 65,552 65,552
39,909 39,899 39,825
24,268 24,263 24,226
52,275 52,269 52,219
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
31,517 31,514 31,489
58,851 58,845 58,795
35,478 35,475 35,450
96,524 96,493 96,244
57,341 57,325 57,201
36,732 36,726 36,676
22,347 22,344 22,319
73,015 73,002 72,903
44,168 44,162 44,113
87,102 87,082 86,927
52,889 52,880 52,802
177,845 177,802 177,454
107,317 107,295 107,121
87,748 87,728 87,573
53,212 53,203 53,125
45,757 45,743 45,632
27,977 27,970 27,914
33,235 33,229 33,179
20,323 20,320 20,295
49,923 49,911 49,812
30,743 30,736 30,687
96,574 96,555 96,406
59,035 59,026 58,951
70,667 70,654 70,555
42,810 42,804 42,754
147,422 147,378 147,030
90,096 90,074 89,900
31,319 31,315 31,278
35,188 35,174 35,063
59,804 59,786 59,637
5,242 5,242 5,242
49,538 49,506 49,248
10,592 10,592 10,592
13,937 13,937 13,937
18,196 18,196 18,196
25,375 25,375 25,375
37,707 37,707 37,707
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
4,717 4,708 4,628

16,113 16,113 16,113


5,449 5,444 5,407
6,635 6,630 6,593
7,900 7,896 7,859
6,783 6,783 6,783
13,649 13,649 13,649
23,233 23,219 23,111
14,211 14,204 14,150
20,228 20,215 20,111
12,398 12,391 12,339
19,342 19,328 19,220
11,955 11,948 11,894
20,228 20,215 20,111
12,398 12,391 12,339
20,787 20,777 20,700
12,676 12,671 12,633
16,894 16,884 16,805
10,443 10,438 10,398
16,219 16,209 16,126
10,105 10,100 10,058
21,006 20,993 20,889
12,767 12,761 12,708
20,120 20,107 19,998
12,324 12,317 12,263
16,829 16,819 16,737
10,392 10,387 10,346
21,010 20,996 20,888
13,173 13,166 13,112

25,562 25,544 25,394


81,165 81,096 80,544
54,800 54,800 54,800
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
21,970 21,970 21,970
34,451 34,451 34,451
79,961 79,961 79,961
62,698 62,698 62,698
36,626 36,626 36,626
83,784 83,784 83,784
99,972 99,972 99,972
146,739 146,739 146,739
58,252 58,252 58,252
81,099 81,099 81,099
73,799 73,799 73,799
130,313 130,313 130,313
76,015 76,015 76,015
55,922 55,922 55,922
32,174 32,174 32,174
57,571 57,547 57,362
46,607 46,607 46,607
42,748 42,748 42,748
36,299 36,299 36,299
35,521 35,521 35,521
35,787 35,787 35,787
50,170 50,170 50,170
44,156 44,156 44,156
80,537 80,537 80,537
148,369 148,369 148,369
66,828 66,828 66,828
42,463 42,463 42,463
33,181 33,181 33,181
57,478 57,478 57,478
19,991 19,991 19,991
23,971 23,971 23,971
25,913 25,913 25,913
33,260 33,260 33,260
22,054 22,054 22,054
51,870 51,870 51,870
350,798 350,798 350,798
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
407,970 407,970 407,970
267,955 267,955 267,955
285,904 285,904 285,904

422,790 421,372 410,036


368,171 366,871 356,475
365,727 364,390 353,705
321,920 320,540 309,511
298,099 296,694 285,463
267,897 266,469 255,047
197,458 196,818 191,695
407,388 406,767 401,793
365,187 364,542 359,383
428,243 427,640 422,815
650,663 650,060 645,235

122,127 122,127 122,127


3,662 3,657 3,620
136,943 136,943 136,943
167,390 167,390 167,390
242,122 242,122 242,122
269,413 269,413 269,413
296,737 296,737 296,737
196,889 196,889 196,889
223,154 223,154 223,154
328,214 328,214 328,214
124,659 124,659 124,659
165,370 165,370 165,370
183,756 183,756 183,756
467,421 467,421 467,421
41,826 41,826 41,826
26,215 26,215 26,215
98,909 98,909 98,909
119,680 119,680 119,680
93,021 93,021 93,021
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
28,986 28,986 28,986
28,986 28,986 28,986
27,489 27,489 27,489
42,100 42,100 42,100
52,049 52,049 52,049
62,660 62,660 62,660
75,261 75,261 75,261
353,388 353,388 353,388
247,277 247,277 247,277
33,479 33,479 33,479
42,764 42,764 42,764
52,049 52,049 52,049
65,312 65,312 65,312

75,514 75,514 75,514


208,895 208,895 208,895
80,128 80,128 80,128
144,033 144,033 144,033
135,659 135,659 135,659
89,083 89,083 89,083
209,609 209,609 209,609
109,383 109,383 109,383
6,574 6,574 6,574
99,448 99,448 99,448

119,916 119,916 119,916


40,926 40,926 40,926
532,173 532,173 532,173
191,779 191,779 191,779
215,936 215,936 215,936

485,671 485,671 485,671


128,111 128,111 128,111
387,884 387,884 387,884
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
6,001 6,001 6,001
273,264 273,264 273,264
121,815 121,815 121,815
85,540 85,540 85,540
88,408 88,408 88,408

10,555 10,555 10,555

11,694 11,694 11,694

9,329 9,329 9,329

220,466 220,466 220,466


265,282 265,282 265,282
21,970 21,970 21,970
34,451 34,451 34,451
33,124 33,124 33,124
42,397 42,397 42,397
87,218 87,218 87,218
221,806 221,806 221,806
44,270 44,270 44,270
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
34,983 34,983 34,983
66,782 66,782 66,782
99,718 99,718 99,718
83,917 83,917 83,917
61,538 61,538 61,538
65,381 65,381 65,381
82,602 82,602 82,602
66,367 66,367 66,367
82,775 82,775 82,775
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
88,459 88,459 88,459
73,025 73,025 73,025
12,404 12,404 12,404
17,412 17,412 17,412
22,744 22,744 22,744
14,081 14,081 14,081
8,434 8,434 8,434
50,533 50,533 50,533
32,368 32,368 32,368
10,546 10,546 10,546
25,051 25,051 25,051
34,716 34,716 34,716
47,084 47,084 47,084
87,737 87,737 87,737
106,802 106,802 106,802
59,582 59,582 59,582
75,762 75,762 75,762
182,710 182,710 182,710
376,293 376,293 376,293
278,213 278,213 278,213
17,495 17,495 17,495
22,069 22,069 22,069
171,597 171,597 171,597

278,876 278,876 278,876

463,753 463,753 463,753

40,104 40,104 40,104

47,269 47,269 47,269

60,843 60,843 60,843

68,808 68,808 68,808


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá

88,634 88,634 88,634

102,999 102,999 102,999

152,470 152,470 152,470


61,556 61,556 61,556
61,805 61,805 61,805
39,718 39,718 39,718
48,858 48,858 48,858
4,129 4,129 4,129
6,496 6,496 6,496
1,005,145 1,005,145 1,005,145
769,020 769,020 769,020
2,572,956 2,572,956 2,572,956
2,145,799 2,145,799 2,145,799
625,891 625,891 625,891
808,697 808,697 808,697
310,105 310,105 310,105

360,004 360,004 360,004


57,194 57,194 57,194
67,650 67,650 67,650
75,181 75,181 75,181
88,475 88,475 88,475
53,802 53,802 53,802
61,297 61,297 61,297
141,896 141,896 141,896
55,224 55,224 55,224
126,830 126,830 126,830
75,914 75,914 75,914
45,005 45,005 45,005
95,038 95,038 95,038
405,964 405,964 405,964
540,377 540,377 540,377
3,497 3,497 3,497
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
4,621 4,621 4,621
7,183 7,183 7,183
12,853 12,853 12,853
269,881 269,881 269,881
76,377 76,377 76,377
103,191 103,191 103,191
42,453 42,453 42,453
1,386,468 1,386,468 1,386,468
1,027,690 1,027,690 1,027,690
1,279,036 1,279,036 1,279,036
594,089 594,089 594,089
108,904 108,904 108,904
498,312 498,312 498,312
623,238 623,238 623,238
1,644,905 1,644,905 1,644,905
1,211,529 1,211,529 1,211,529

37,925 37,902 37,716


37,496 37,473 37,287
14,396 14,391 14,354
24,576 24,530 24,158
80,937 80,891 80,520
26,199 26,171 25,946
54,906 54,768 53,665
75,427 75,206 73,442
30,218 30,218 30,218
22,993 22,993 22,993
27,032 27,032 27,032
44,424 44,300 43,308
51,904 51,753 50,539
74,872 74,638 72,763
78,802 77,833 70,083
87,615 88,685 81,329

56,426 56,417 56,343


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
33,884 33,880 33,843
63,616 63,593 63,407
66,866 66,843 66,657
71,141 71,118 70,932
74,409 74,400 74,325
37,122 37,107 36,988
160,274 160,232 159,898
45,519 45,484 45,210
44,091 44,091 44,091
9,822 9,807 9,689
9,330 9,330 9,330
12,511 12,511 12,511
10,547 10,547 10,547
17,580 17,580 17,580
34,127 34,127 34,127
9,320 9,320 9,320
74,411 74,411 74,411
116,421 116,389 116,129
7,642 7,642 7,642
31,619 31,610 31,536
45,743 45,743 45,743
53,100 53,100 53,100
49,298 49,298 49,298
48,898 48,889 48,814
54,904 54,894 54,820
11,030 11,030 11,030
48,700 48,687 48,575
20,569 20,569 20,569
122,853 122,853 122,853
10,032 10,032 10,032
22,485 22,485 22,485
14,497 14,497 14,497
14,090 14,090 14,090
8,638 8,638 8,638
8,786 8,786 8,786
19,080 19,080 19,080
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
17,406 17,406 17,406
18,517 18,517 18,517
21,406 21,406 21,406
64,410 64,401 64,326
76,997 76,997 76,997
34,577 34,577 34,577
13,291 13,291 13,291
100,932 100,932 100,932
122,336 122,336 122,336

72,371 72,371 72,371


36,241 36,241 36,241
55,517 55,517 55,517
67,982 67,982 67,982
50,797 50,797 50,797
93,914 93,914 93,914
48,539 48,539 48,539
103,672 103,672 103,672
13,555 13,555 13,555

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
43,707 43,707 43,707

49,987 49,987 49,987


85,005 85,005 85,005
19,114 19,114 19,114
65,104 73,671 73,671
88,922 87,801 78,841
115,665 124,232 163,641
55,010 58,437 63,577
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
107,762 116,329 123,183
112,635 121,202 160,610

300,356 300,356 300,356


883,171 883,171 883,171
479,015 479,015 479,015
139,865 139,865 139,865
195,164 195,164 195,164
181,335 181,335 181,335
397,724 397,724 397,724
1,015,470 1,015,470 1,015,470
289,248 289,248 289,248
205,397 205,397 205,397
82,410 82,410 82,410
248,275 248,275 248,275

365,155 365,155 365,155

8,357 8,357 8,357


3,089 3,089 3,089
11,176 11,176 11,176
42,223 42,223 42,223
5,856 5,856 5,856
65,175 65,175 65,175
3,490 3,490 3,490
2,775 2,775 2,775
13,964 13,964 13,964
4,039 4,039 4,039
14,722 14,722 14,722
5,723 5,723 5,723
6,521 6,521 6,521
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
7,054 7,054 7,054
4,422 4,422 4,422
15,555 15,555 15,555
9,656 9,656 9,656
22,870 22,870 22,870
2,695 2,695 2,695
12,140 12,140 12,140
3,278 3,278 3,278
12,612 12,612 12,612
7,098 7,098 7,098
4,470 4,470 4,470
21,762 21,762 21,762
12,724 12,724 12,724
7,871 7,871 7,871

6,007,320 6,007,320 6,007,320


10,614,029 10,614,029 10,614,029
2,777,836 2,777,836 2,777,836
9,077,840 9,077,840 9,077,840
8,500,468 8,500,468 8,500,468
2,695 2,695 2,695
853,198 853,198 853,198
85,157 85,157 85,157
1,542,688 1,542,674 1,542,560
665,348 665,013 662,342

29,266 29,266 29,266


43,409 43,409 43,409
53,793 53,793 53,793
17,590 17,590 17,590
21,290 21,290 21,290
29,004 29,004 29,004
26,085 26,085 26,085
27,495 27,495 27,495
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
34,355 34,355 34,355
17,528 17,528 17,528
22,961 22,961 22,961
35,285 35,285 35,285
270,203 270,203 270,203
310,930 310,930 310,930
324,351 324,351 324,351
301,109 301,109 301,109

219,794 219,794 219,794


33,641 33,641 33,641
102,765 102,765 102,765
262,193 262,193 262,193
51,797 51,797 51,797
568,917 568,917 568,917
1,407,978 1,407,978 1,407,978
45,067 45,067 45,067
219,688 219,688 219,688
43,899 43,899 43,899
3,739 3,739 3,739
6,262 6,262 6,262
18,675 18,675 18,675
24,449 24,449 24,449
31,714 31,714 31,714
121,814 121,814 121,814
31,786 31,786 31,786
103,809 103,809 103,809
183,475 183,475 183,475
287,222 287,222 287,222
357,290 357,290 357,290
390,121 390,121 390,121
572,880 572,880 572,880
337,925 337,925 337,925
103,256 103,256 103,256
13,729 13,729 13,729
28,044 28,044 28,044
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
4,983 4,983 4,983
35,181 35,181 35,181
36,745 36,745 36,745
37,528 37,528 37,528
24,484 24,484 24,484
27,058 27,058 27,058
28,139 28,139 28,139
47,150 47,150 47,150
608,972 608,972 608,972
313,255 313,255 313,255
88,454 88,454 88,454
1,832 1,832 1,832
8,449 8,449 8,449
12,571 12,571 12,571
20,956 20,956 20,956
3,894 3,894 3,894
22,421 22,421 22,421
32,544 32,544 32,544
19,353 19,353 19,353
15,313 15,313 15,313
613,468 613,468 613,468
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
URBANISMO

9,712 9,712 9,712


89,839 89,839 89,839
505,242 505,242 505,242
1,078,332 1,078,332 1,078,332
123,725 123,725 123,725
752,850 752,850 752,850
1,619,742 1,619,742 1,619,742
13,076 13,076 13,076
16,092 16,092 16,092
20,167 20,167 20,167
22,058 22,058 22,058
26,414 26,414 26,414
26,414 26,414 26,414
105,691 105,691 105,691
122,443 122,443 122,443
378,833 378,833 378,833
142,226 142,226 142,226
234,462 234,462 234,462
1,037,039 1,037,039 1,037,039
1,194,762 1,194,762 1,194,762
14,132 14,132 14,132
12,484 12,484 12,484
30,549 30,549 30,549
121,538 121,538 121,538
180,790 180,790 180,790
29,641 29,641 29,641
101,955 101,955 101,955
150,887 150,887 150,887
29,916 29,916 29,916
61,635 61,635 61,635
247,835 247,835 247,835
71,880 71,880 71,880
288,283 288,283 288,283
173,323 173,323 173,323
491,989 491,989 491,989
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
1,316,137 1,316,137 1,316,137
1,944,666 1,944,666 1,944,666

10,757 10,757 10,757


24,609 24,609 24,609
19,114 19,114 19,114
70,529 69,459 60,905
60,070 68,637 68,637
60,070 63,497 68,637
51,874 58,023 76,638
53,790 60,058 52,745
53,392 52,789 47,963

112,975 112,975 112,975


1,176,864 1,176,864 1,176,864
147,605 147,605 147,605
1,363,085 1,363,085 1,363,085
950,141 950,141 950,141
62,451 62,451 62,451
112,149 112,149 112,149
264,705 264,705 264,705
264,699 264,699 264,699
424,912 424,912 424,912
112,196 112,196 112,196
112,196 112,196 112,196
264,705 264,705 264,705
264,705 264,705 264,705
424,912 424,912 424,912
427,714 427,714 427,714
693,728 693,728 693,728
1,113,124 1,113,124 1,113,124
68,803 68,803 68,803
358,112 358,112 358,112
400,506 400,506 400,506
1,109,013 1,109,013 1,109,013
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
64,508 64,502 64,452
324,757 324,757 324,757
49,346 49,346 49,346
69,746 69,746 69,746
100,600 100,600 100,600
154,399 154,399 154,399
248,049 248,049 248,049
360,507 360,507 360,507
456,033 456,033 456,033
599,543 599,543 599,543
824,284 824,284 824,284

647,413 646,611 640,200

620,094 619,799 617,435

694,720 694,186 689,912

767,417 766,415 758,401

879,497 879,081 875,752

799,524 798,789 792,912


976,352 976,053 973,646
1,402,985 1,402,001 1,394,114
1,913,998 1,911,865 1,894,811
2,531,042 2,527,497 2,499,148
1,807,775 1,807,775 1,807,775
3,819,698 3,819,698 3,819,698
136,779 136,767 136,670

70,249 70,216 69,957


83,561 83,528 83,269
52,741 52,596 51,438
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
57,341 57,200 56,078
57,597 57,461 56,369
248,623 248,611 248,514
18,032 18,015 17,876
37,798 37,696 36,880
81,825 81,819 81,767
539,761 539,544 537,813
59,684 59,656 59,435
87,240 87,213 86,992
32,039 31,983 31,535
51,034 50,921 50,012
92,761 93,750 98,275
58,202 58,185 58,052

198,707 198,640 198,105


653,514 653,420 652,672
211,304 211,290 211,177
158,317 158,237 157,596
160,185 160,105 159,464
187,774 187,689 187,016
56,605 56,580 56,381
65,095 65,067 64,845
305,978 305,971 305,922
807,565 807,525 807,204
3,311,744 3,311,717 3,311,504
3,406,803 3,406,776 3,406,563
476,112 476,084 475,859
629,415 629,303 628,404
524,692 524,692 524,692
243,420 243,380 243,060
563,451 563,436 563,312
6,292,575 6,292,374 6,290,771

3,958 3,958 3,958


42,701 42,701 42,701
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
307,437 307,430 307,382
484,539 484,483 484,033
230,861 230,855 230,806
245,123 245,117 245,068
255,924 255,918 255,869
13,327 13,327 13,327
14,227 14,227 14,227
115,547 115,547 115,547
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
ECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548


35,105 35,105 35,105
8,749 8,749 8,749
14,967 14,967 14,967
13,068 13,068 13,068
7,499 7,499 7,499
481 481 481

12,832 12,832 12,832

20,948 20,948 20,948

64,696 64,696 64,696

79,470 79,470 79,470

19,035 19,035 19,035

39,738 39,738 39,738


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá

31,203 31,203 31,203

53,644 53,644 53,644

5,366 5,366 5,366


107,762 116,329 123,183
112,635 121,202 160,610
139,125 139,125 139,125
3,162 3,162 3,162
1,106 1,106 1,106
217,834 217,545 215,236
62,202 62,154 61,763
542,199 542,199 542,199
548,449 548,449 548,449
584,676 584,676 584,676
554,699 554,699 554,699
347,430 354,605 367,720
257,137 265,704 305,113
251,262 259,829 266,682
37,798 37,798 37,798
167,298 167,298 167,298
55,010 58,437 63,577
11,257 11,237 11,074
4,496 4,486 4,404
603,575 602,291 592,028

633,936 632,594 621,871

654,185 652,805 641,773

6,984 6,984 6,984


81,947 90,646 80,497
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá

874,716 873,259 861,617


749,598 748,166 736,717
794,531 793,042 781,140
535,402 534,089 523,589
630,206 628,841 617,925
532,934 531,583 520,791
627,640 626,236 615,017
691,965 690,614 679,822
551,115 549,711 538,492
734,615 733,211 721,992
11,785 11,785 11,785

15,078 15,078 15,078


1,772 1,772 1,772
2,650,773 2,650,773 2,650,773

4,040,195 4,037,704 4,017,789

1,681,808 1,680,471 1,669,786

85,613 85,613 85,613


352,577 352,417 351,135
417,449 417,449 417,449
16,647 16,647 16,647
438,266 438,954 430,757
64,880 73,579 90,972
66,144 74,052 74,052
346,798 345,379 334,036
338,797 341,117 330,688
347,440 349,760 339,331
353,090 355,425 345,117
361,733 364,068 353,760
483,137 481,744 470,604
ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá
576,091 574,642 563,062
169,080 177,383 167,696
173,151 181,454 171,767
40,161 40,075 39,392

15,240 15,197 14,855

9,946 9,946 9,946

14,148 14,148 14,148

19,016 19,016 19,016

22,780 22,780 22,780

29,251 29,251 29,251

7,137 7,137 7,137

8,126 8,126 8,126

8,444 8,444 8,444

6,031 6,031 6,031

9,056 9,056 9,056


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá

7,395 7,395 7,395

9,056 9,056 9,056

17,350 17,350 17,350

617,665 617,646 617,488

347,441 347,148 344,806

864,123 864,123 864,123


124,733 128,028 132,970
4,343 4,343 4,343
84,075 84,075 84,075

128,067 128,067 128,067


490,085 488,636 477,056
184,901 193,205 183,517
66,564 66,564 66,564

3,958 3,958 3,958


42,701 42,701 42,701
82,018 82,018 82,018
68,255 68,255 68,255
144,270 144,200 143,640
13,327 13,327 13,327

835 835 835

131,984 131,984 131,984


ACIÓN DE CUNDINAMARCA
NSTRUCCIÓN, URBANISMO Y VÍAS (2018)
VINCIA: SABANA CENTRO
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Tabio Tocancipá Zipaquirá

25,566 25,566 25,566


8,310 8,310 8,310
448,890 448,890 448,890

1,804 1,804 1,804

15,196 15,196 15,196


24,534 24,534 24,534
9,386 9,386 9,386
BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
p CONSTRUCCIÓN
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2
o
UN ### 2,007,408 2,036,939 2,008,427 1,999,262 2,020,646 2,014,536 2,018,610
1.2 CAMPAMENTO 9 M2 UN ### 1,170,077 1,184,842 1,170,586 1,166,004 1,176,696 1,173,641 1,175,677
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,113 14,113 14,113 14,113 14,113 14,113 14,113
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,821 15,821 15,821 15,821 15,821 15,821 15,821
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,298 18,298 18,298 18,298 18,298 18,298 18,298
1.6 CERCA EN TABLA H=2.30 M ML ### 65,434 65,434 65,434 65,434 65,434 65,434 65,434
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,113 46,431 46,124 46,026 46,256 46,190 46,234
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,462 21,780 21,473 21,374 21,605 21,539 21,583
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 900,108 902,990 899,521 898,535 900,638 899,980 900,419
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,379 10,379 10,379 10,379 10,379 10,379 10,379
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,743 3,743 3,743 3,743 3,743 3,743 3,743
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,676,226 2,676,226 2,676,226 2,676,226 2,676,226 2,676,226 2,676,226
1.44 RED TELEFÓNICA PROVISIONAL UN ### 247,794 247,794 247,794 247,794 247,794 247,794 247,794
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 89,477 84,337 74,080 77,483 74,056 74,056 74,056
2.2 BASE ARENA CEMENTO 1:20 M3 ### 223,258 254,928 224,351 214,522 237,455 230,904 235,272
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,077 22,077 22,077 22,077 22,077 22,077 22,077
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 650,359 681,659 651,439 641,726 664,390 657,914 662,231
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 652,363 684,678 653,478 643,449 666,849 660,164 664,621
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 607,777 638,036 608,821 599,430 621,342 615,081 619,255
2.9 PILOTE DE MADERA D=20 CM ML ### 49,656 49,656 49,656 49,656 49,656 49,656 49,656
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM)
ML ### 153,134 153,134 153,134 153,134 153,134 153,134 153,134
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2.11 UNA DISTANCIA MENOR DE 5 KM) ML ### 190,916 190,916 190,916 190,916 190,916 190,916 190,916
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2.12 UNA DISTANCIA MENOR DE 5 KM) ML ### 236,606 236,606 236,606 236,606 236,606 236,606 236,606
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2.13 UNA DISTANCIA MENOR DE 5 KM)
ML ### 298,111 298,111 298,111 298,111 298,111 298,111 298,111
2.14 PILOTE HINCADO 25X25 ML ### 105,404 107,595 105,479 104,800 106,386 105,933 106,235
2.15 PILOTE HINCADO 30X30 ML ### 130,180 133,355 130,290 129,305 131,604 130,947 131,385
2.16 DADOS EN CONCRETO 3500PSI M3 ### 593,628 623,887 594,672 585,281 607,192 600,932 605,106
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM) ML ### 91,623 91,623 91,623 91,623 91,623 91,623 91,623

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 38,430 38,627 38,437 38,376 38,518 38,478 38,505
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
3.2 SIFÓN EN PVC 6" UN ###
i 197,551 197,747 197,557 197,496 197,639 197,598 197,625
p
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### i 451,419 460,704 446,044 442,394 449,259 446,826 448,448
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### o 226,050 229,660 225,694 224,509 227,135 226,345 226,871
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 258,038 263,966 257,488 255,546 259,857 258,563 259,426
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 340,256 350,553 339,857 336,559 344,034 341,836 343,302
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 104,476 104,446 104,406 104,406 104,386 104,386 104,386
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,277,808 1,277,509 1,277,111 1,277,111 1,276,912 1,276,912 1,276,912
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 117,001 119,174 117,076 116,401 117,975 117,525 117,825
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 73,588 74,735 73,628 73,272 74,102 73,865 74,023
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,157 28,725 28,176 28,000 28,411 28,294 28,372
3.12 TUBERÍA DRENAJE PVC 160 ML ### 45,104 45,672 45,124 44,948 45,359 45,241 45,320
3.13 TUBERÍA DRENAJE PVC 200 ML ### 59,201 59,997 59,229 58,982 59,558 59,393 59,503
3.14 TUBERÍA DRENAJE PVC 250 ML ### 80,885 81,794 80,916 80,634 81,292 81,104 81,229
3.15 TUBERÍA DRENAJE PVC 315 ML ### 111,590 112,385 111,617 111,370 111,946 111,782 111,891
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 959,318 968,406 959,632 956,811 963,392 961,512 962,765
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3.17 MATERIAL FILTRANTE) UN ### 1,358,994 1,377,170 1,359,622 1,353,981 1,367,142 1,363,382 1,365,889
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3.18 MATERIAL FILTRANTE) UN ### 1,777,482 1,813,834 1,778,737 1,767,455 1,793,778 1,786,257 1,791,271

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,120 42,120 42,120 42,120 42,120 42,120 42,120
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 55,580 55,580 55,580 55,580 55,580 55,580 55,580
4.3 COLUMNAS 3500 PSI M3 ### 813,624 843,882 814,667 805,277 827,188 820,928 825,101
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 265,409 283,161 263,139 257,241 266,824 266,235 264,678
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4.5 DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 99,056 101,993 99,157 98,245 100,373 99,765 100,170
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
4.6 DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 116,817 120,342 116,938 115,844 118,397 117,668 118,154
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO) M2 ### 130,752 135,452 130,914 129,455 132,859 131,886 132,534

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 137,963 142,957 138,135 136,585 140,202 139,168 139,857

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 158,170 164,339 158,382 156,468 160,935 159,659 160,510
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### p 175,965 183,015 176,208 174,020 179,125 177,667 178,639
i
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN o
4.11 REFUERZO) M2 ### 195,321 203,252 195,594 193,132 198,876 197,235 198,329
4.12 ENTREPISO VIGUETA PLACA M2 ### 99,397 99,884 99,414 99,262 99,615 99,514 99,582
4.13 ESCALERA MACIZA 3500 PSI M3 ### 961,169 991,427 962,212 952,822 974,733 968,473 972,646
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 95,147 95,550 95,161 95,035 95,328 95,244 95,300
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 80,078 83,104 80,182 79,243 81,434 80,808 81,226
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 90,141 93,842 90,268 89,119 91,800 91,034 91,545
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 105,118 109,759 105,278 103,838 107,199 106,238 106,879
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 713,231 743,489 714,274 704,884 726,795 720,534 724,708
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4.19 M) UN ### 49,605 50,532 49,637 49,349 50,020 49,829 49,957
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 284,766 298,280 285,232 281,039 290,824 288,028 289,892
4.21 ACERO FIGURADO 37000 PSI KG ### 4,179 4,179 4,179 4,179 4,179 4,179 4,179
4.22 ACERO FIGURADO 60000 PSI KG ### 4,382 4,382 4,382 4,382 4,382 4,382 4,382
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,158 6,158 6,158 6,158 6,158 6,158 6,158
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 860,164 890,423 861,208 851,817 873,728 867,468 871,642
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 785,256 818,376 786,398 776,119 800,103 793,251 797,819
4.26 VIGA AÉREA 3500 PSI M3 ### 854,071 884,329 855,114 845,723 867,635 861,374 865,548
4.27 VIGA CINTA 3500 PSI M3 ### 833,989 864,247 835,032 825,642 847,553 841,293 845,466
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,044,452 1,074,710 1,045,495 1,036,105 1,058,016 1,051,755 1,055,929
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 332,111 365,907 333,277 322,788 347,261 340,268 344,930

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,032 30,847 30,060 29,808 30,397 30,229 30,341
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 50,410 51,224 50,438 50,185 50,775 50,606 50,719
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,219 35,415 35,225 35,164 35,307 35,266 35,293
5.4 ARCOS EN LADRILLO PRENSADO ML ### 164,390 164,783 164,403 164,281 164,566 164,485 164,539
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,398 45,324 44,430 44,142 44,813 44,621 44,749
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,245 27,648 27,259 27,133 27,426 27,342 27,398
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 99,695 100,482 99,723 99,478 100,048 99,885 99,994
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 91,677 94,766 91,783 90,825 93,062 92,423 92,849
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 91,425 91,425 91,425 91,425 91,425 91,425 91,425
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,636 53,636 53,636 53,636 53,636 53,636 53,636
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 88,055 88,055 88,055 88,055 88,055 88,055 88,055
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 51,951 51,951 51,951 51,951 51,951 51,951 51,951
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ###
i 102,043 102,043 102,043 102,043 102,043 102,043 102,043
p
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### i 60,266 60,266 60,266 60,266 60,266 60,266 60,266
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### o 113,479 113,479 113,479 113,479 113,479 113,479 113,479
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 65,985 65,985 65,985 65,985 65,985 65,985 65,985
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 41,078 41,473 41,092 40,969 41,255 41,174 41,228
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,853 25,050 24,860 24,798 24,941 24,901 24,928
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 53,277 53,541 53,286 53,205 53,395 53,341 53,377
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,018 32,150 32,022 31,982 32,077 32,050 32,068
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,906 60,170 59,915 59,834 60,025 59,970 60,006
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,006 36,138 36,010 35,970 36,065 36,038 36,056
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 100,308 101,626 100,353 99,944 100,898 100,626 100,808
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 59,233 59,892 59,256 59,051 59,528 59,392 59,483
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,569 37,833 37,578 37,496 37,687 37,633 37,669
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,765 22,897 22,770 22,729 22,824 22,797 22,815
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 74,729 75,257 74,748 74,584 74,966 74,857 74,929
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,026 45,289 45,035 44,953 45,144 45,090 45,126
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 88,156 88,560 88,170 88,045 88,337 88,254 88,309
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,417 53,618 53,424 53,361 53,507 53,465 53,493
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 183,555 185,400 183,618 183,046 184,382 184,000 184,255
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 110,171 111,094 110,203 109,917 110,585 110,394 110,521
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 90,115 90,880 90,142 89,905 90,458 90,300 90,405
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,396 54,778 54,409 54,291 54,567 54,488 54,541
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 47,434 48,024 47,454 47,271 47,698 47,576 47,658
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,815 29,110 28,826 28,734 28,948 28,887 28,927
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 34,063 34,326 34,072 33,990 34,181 34,126 34,163
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,737 20,869 20,742 20,701 20,796 20,769 20,787
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 51,542 52,069 51,560 51,396 51,778 51,669 51,742
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,552 31,815 31,561 31,479 31,670 31,615 31,652
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 99,214 100,005 99,242 98,996 99,569 99,405 99,514
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,355 60,751 60,369 60,246 60,533 60,451 60,505
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 72,366 72,893 72,384 72,221 72,603 72,494 72,566
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,666 43,930 43,675 43,593 43,784 43,730 43,766
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 152,754 154,599 152,817 152,245 153,581 153,199 153,454
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 92,770 93,693 92,802 92,516 93,184 92,993 93,120
5.47 REMATES LADRILLO PRENSADO ML ### 31,959 32,155 31,966 31,904 32,047 32,006 32,033
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,634 37,184 36,653 36,483 36,881 36,767 36,843
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,809 62,542 61,834 61,606 62,137 61,986 62,087
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
5.50 LAVADA DE FACHADA M2 ###
i 5,247 5,247 5,247 5,247 5,247 5,247 5,247
p
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### i 50,771 51,586 50,799 50,546 51,136 50,968 51,080
5.52 DOVELA, GROUTING 3000 PSI ML ### o 10,604 10,604 10,604 10,604 10,604 10,604 10,604
5.53 ANCLAJE 3/8" L=30CM UN ### 13,975 13,975 13,975 13,975 13,975 13,975 13,975
5.54 ANCLAJE 1/2" L=50CM UN ### 18,250 18,250 18,250 18,250 18,250 18,250 18,250
5.55 ANCLAJE 5/8" L=70CM UN ### 25,487 25,487 25,487 25,487 25,487 25,487 25,487
5.56 ANCLAJE 3/4" L=70CM UN ### 37,921 37,921 37,921 37,921 37,921 37,921 37,921
5.57 ANCLAJE 1" L= 70CM UN ### 4,992 5,219 5,000 4,930 5,094 5,047 5,078

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,148 16,148 16,148 16,148 16,148 16,148 16,148
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,918 6,115 5,925 5,864 6,006 5,965 5,993
6.3 FILOS O DILATACIONES S/MURO ML ### 7,104 7,301 7,111 7,050 7,192 7,151 7,178
6.4 GOTERA EN MORTERO 1:4 ML ### 8,380 8,577 8,387 8,326 8,468 8,428 8,455
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,830 6,830 6,830 6,830 6,830 6,830 6,830
6.6 MALLA BAJO ENTRAMADO M2 ### 13,695 13,695 13,695 13,695 13,695 13,695 13,695
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,477 25,012 24,496 24,330 24,717 24,607 24,680
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,833 15,100 14,842 14,759 14,953 14,897 14,934
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,581 22,135 21,600 21,428 21,829 21,715 21,791
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,074 13,351 13,084 12,998 13,198 13,141 13,179
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 20,586 21,121 20,605 20,439 20,826 20,716 20,789
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,577 12,845 12,586 12,503 12,697 12,642 12,679
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,581 22,135 21,600 21,428 21,829 21,715 21,791
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,074 13,351 13,084 12,998 13,198 13,141 13,179
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 21,725 22,106 21,738 21,620 21,896 21,817 21,870
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,145 13,336 13,152 13,093 13,231 13,191 13,218
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,925 18,347 17,940 17,809 18,114 18,027 18,085
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,958 11,169 10,965 10,900 11,052 11,009 11,038
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,167 17,575 17,181 17,055 17,350 17,266 17,322
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,579 10,783 10,586 10,523 10,670 10,628 10,656
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,359 22,913 22,378 22,207 22,607 22,493 22,569
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,443 13,720 13,453 13,367 13,568 13,510 13,548
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,365 21,900 21,383 21,217 21,604 21,494 21,568
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,946 13,214 12,955 12,872 13,066 13,011 13,048
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,778 18,185 17,792 17,665 17,960 17,876 17,932
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,866 11,070 10,873 10,810 10,958 10,916 10,944
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,254 22,789 22,272 22,106 22,494 22,383 22,457
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ###
i 13,795 14,063 13,804 13,721 13,915 13,860 13,897
p
i
7 CUBIERTAS o
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 27,495 28,286 27,522 27,277 27,849 27,686 27,795
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE)
M2 ### 83,443 84,988 83,496 83,017 84,136 83,816 84,029
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,268 55,268 55,268 55,268 55,268 55,268 55,268
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,114 22,114 22,114 22,114 22,114 22,114 22,114
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,694 34,694 34,694 34,694 34,694 34,694 34,694
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 80,681 80,681 80,681 80,681 80,681 80,681 80,681
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,236 63,236 63,236 63,236 63,236 63,236 63,236
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 36,891 36,891 36,891 36,891 36,891 36,891 36,891
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 84,545 84,545 84,545 84,545 84,545 84,545 84,545
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 100,902 100,902 100,902 100,902 100,902 100,902 100,902
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 148,162 148,162 148,162 148,162 148,162 148,162 148,162
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 58,729 58,729 58,729 58,729 58,729 58,729 58,729
7.13 CANAL PVC AMAZONAS ML ### 81,713 81,713 81,713 81,713 81,713 81,713 81,713
7.14 CANAL PVC RAINGO ML ### 74,334 74,334 74,334 74,334 74,334 74,334 74,334
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 131,467 131,467 131,467 131,467 131,467 131,467 131,467
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 76,717 76,717 76,717 76,717 76,717 76,717 76,717
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 56,413 56,413 56,413 56,413 56,413 56,413 56,413
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,356 32,356 32,356 32,356 32,356 32,356 32,356
7.19 TEJA DE BARRO M2 ### 60,186 61,169 60,220 59,914 60,627 60,423 60,559
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 47,021 47,021 47,021 47,021 47,021 47,021 47,021
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,121 43,121 43,121 43,121 43,121 43,121 43,121
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,541 36,541 36,541 36,541 36,541 36,541 36,541
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 35,764 35,764 35,764 35,764 35,764 35,764 35,764
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 36,032 36,032 36,032 36,032 36,032 36,032 36,032
7.25 TEJA TERMOACÚSTICA M2 ### 50,576 50,576 50,576 50,576 50,576 50,576 50,576
7.26 TEJA PLÁSTICA No.6 M2 ### 44,499 44,499 44,499 44,499 44,499 44,499 44,499
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 81,247 81,247 81,247 81,247 81,247 81,247 81,247
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7.28 30MM M2 ### 149,780 149,780 149,780 149,780 149,780 149,780 149,780
7.29 TEJA SIN TRASLAPO M2 ### 67,424 67,424 67,424 67,424 67,424 67,424 67,424
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 42,667 42,667 42,667 42,667 42,667 42,667 42,667
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,368 33,368 33,368 33,368 33,368 33,368 33,368
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 57,920 57,920 57,920 57,920 57,920 57,920 57,920
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ###
i 20,077 20,077 20,077 20,077 20,077 20,077 20,077
p
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### i 24,099 24,099 24,099 24,099 24,099 24,099 24,099
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### o 26,071 26,071 26,071 26,071 26,071 26,071 26,071
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,496 33,496 33,496 33,496 33,496 33,496 33,496
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,179 22,179 22,179 22,179 22,179 22,179 22,179
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,180 52,180 52,180 52,180 52,180 52,180 52,180
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 354,371 354,371 354,371 354,371 354,371 354,371 354,371
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 409,841 409,841 409,841 409,841 409,841 409,841 409,841
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 270,234 270,234 270,234 270,234 270,234 270,234 270,234
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 288,463 288,463 288,463 288,463 288,463 288,463 288,463

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 460,599 492,348 461,694 451,841 474,831 468,262 472,642
8.2 CONCRETO 3500 PSI M3 ### 403,570 432,947 404,583 395,466 416,739 410,661 414,713
8.3 CONCRETO 3000 PSI M3 ### 402,538 432,926 403,586 394,156 416,160 409,873 414,064
8.4 CONCRETO 2500 PSI M3 ### 357,715 388,606 358,781 349,194 371,563 365,172 369,433
8.5 CONCRETO 2000 PSI M3 ### 335,517 367,318 336,614 326,745 349,773 343,193 347,580
8.6 CONCRETO 1500 PSI M3 ### 307,327 340,139 308,459 298,276 322,036 315,247 319,773
8.7 MORTERO SECO 1:10 M3 ### 261,998 289,144 262,935 254,510 274,167 268,551 272,295
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 471,808 498,167 472,717 464,537 483,624 478,171 481,807
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 424,448 449,921 425,326 417,421 435,867 430,597 434,110
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 484,554 508,377 485,375 477,982 495,233 490,305 493,590
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 709,314 733,137 710,135 702,742 719,993 715,065 718,350

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 123,075 123,075 123,075 123,075 123,075 123,075 123,075
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,141 4,338 4,148 4,087 4,229 4,188 4,215
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 137,913 137,913 137,913 137,913 137,913 137,913 137,913
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 168,681 168,681 168,681 168,681 168,681 168,681 168,681
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 244,386 244,386 244,386 244,386 244,386 244,386 244,386
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 271,959 271,959 271,959 271,959 271,959 271,959 271,959
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 299,563 299,563 299,563 299,563 299,563 299,563 299,563
9.8 HOJA PUERTA FORTEC 0.81 UN ### 198,825 198,825 198,825 198,825 198,825 198,825 198,825
9.9 HOJA PUERTA FORTEC 0.91 UN ### 225,367 225,367 225,367 225,367 225,367 225,367 225,367
9.10 HOJA PUERTA FORTEC 1.50 UN ### 331,534 331,534 331,534 331,534 331,534 331,534 331,534
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 125,835 125,835 125,835 125,835 125,835 125,835 125,835
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 166,975 166,975 166,975 166,975 166,975 166,975 166,975
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ###
i 185,554 185,554 185,554 185,554 185,554 185,554 185,554
p
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### i 472,207 472,207 472,207 472,207 472,207 472,207 472,207
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### o 42,118 42,118 42,118 42,118 42,118 42,118 42,118
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,343 26,343 26,343 26,343 26,343 26,343 26,343
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 99,590 99,590 99,590 99,590 99,590 99,590 99,590
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 120,869 120,869 120,869 120,869 120,869 120,869 120,869
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 93,929 93,929 93,929 93,929 93,929 93,929 93,929
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,220 29,220 29,220 29,220 29,220 29,220 29,220
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,220 29,220 29,220 29,220 29,220 29,220 29,220
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,707 27,707 27,707 27,707 27,707 27,707 27,707
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,415 42,415 42,415 42,415 42,415 42,415 42,415
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 52,468 52,468 52,468 52,468 52,468 52,468 52,468
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 63,191 63,191 63,191 63,191 63,191 63,191 63,191
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 75,924 75,924 75,924 75,924 75,924 75,924 75,924
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 356,881 356,881 356,881 356,881 356,881 356,881 356,881
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 249,652 249,652 249,652 249,652 249,652 249,652 249,652
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,703 33,703 33,703 33,703 33,703 33,703 33,703
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 43,085 43,085 43,085 43,085 43,085 43,085 43,085
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 52,468 52,468 52,468 52,468 52,468 52,468 52,468
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 65,872 65,872 65,872 65,872 65,872 65,872 65,872

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 76,074 76,074 76,074 76,074 76,074 76,074 76,074
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 210,859 210,859 210,859 210,859 210,859 210,859 210,859
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO) ML ### 80,660 80,660 80,660 80,660 80,660 80,660 80,660
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 144,762 144,762 144,762 144,762 144,762 144,762 144,762
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 136,622 136,622 136,622 136,622 136,622 136,622 136,622
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,707 89,707 89,707 89,707 89,707 89,707 89,707
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 211,196 211,196 211,196 211,196 211,196 211,196 211,196
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 110,141 110,141 110,141 110,141 110,141 110,141 110,141
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,616 6,616 6,616 6,616 6,616 6,616 6,616
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 99,907 99,907 99,907 99,907 99,907 99,907 99,907
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA)
10,10(1) H: 2.00 MTS
M2 ### 120,872 120,872 120,872 120,872 120,872 120,872 120,872

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,121 41,121 41,121 41,121 41,121 41,121 41,121
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### p 537,349 537,349 537,349 537,349 537,349 537,349 537,349
i
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### o 193,504 193,504 193,504 193,504 193,504 193,504 193,504
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA M2 ### 217,620 217,620 217,620 217,620 217,620 217,620 217,620

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE


10.15 PUERTAS Y ACCESORIOS) M2 ### 490,236 490,236 490,236 490,236 490,236 490,236 490,236
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.
10.16 ANTICORROSIVO M2 ### 128,785 128,785 128,785 128,785 128,785 128,785 128,785
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 391,734 391,734 391,734 391,734 391,734 391,734 391,734
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,040 6,040 6,040 6,040 6,040 6,040 6,040
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 275,805 275,805 275,805 275,805 275,805 275,805 275,805
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 122,506 122,506 122,506 122,506 122,506 122,506 122,506
10.21 REJILLA PISO 0.30 M M2 ### 86,191 86,191 86,191 86,191 86,191 86,191 86,191
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 89,045 89,045 89,045 89,045 89,045 89,045 89,045
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,607 10,607 10,607 10,607 10,607 10,607 10,607
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS
10.24 DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 11,757 11,757 11,757 11,757 11,757 11,757 11,757
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO,
MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,369 9,369 9,369 9,369 9,369 9,369 9,369
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 221,655 221,655 221,655 221,655 221,655 221,655 221,655
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 266,941 266,941 266,941 266,941 266,941 266,941 266,941
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,114 22,114 22,114 22,114 22,114 22,114 22,114
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 34,694 34,694 34,694 34,694 34,694 34,694 34,694
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,332 33,332 33,332 33,332 33,332 33,332 33,332
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 42,688 42,688 42,688 42,688 42,688 42,688 42,688
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 87,884 87,884 87,884 87,884 87,884 87,884 87,884
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ###
i 223,008 223,008 223,008 223,008 223,008 223,008 223,008
p
11.9 INSTALACIÓN APARATO SANITARIO UN ### i 44,282 44,282 44,282 44,282 44,282 44,282 44,282
11.10 INSTALACIÓN BOMBAS AGUA UN ### o 616,334 616,334 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 35,163 35,163 35,163 35,163 35,163 35,163 35,163
11.13 NIPLE PASAMURO 2" UN ### 67,031 67,031 67,031 67,031 67,031 67,031 67,031
11.14 NIPLE PASAMURO 4" UN ### 100,119 100,119 100,119 100,119 100,119 100,119 100,119
11.15 PUNTO AGUA CALIENTE CPVC UN ### 84,344 84,344 84,344 84,344 84,344 84,344 84,344
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 61,733 61,733 61,733 61,733 61,733 61,733 61,733
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 65,618 65,618 65,618 65,618 65,618 65,618 65,618
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 82,905 82,905 82,905 82,905 82,905 82,905 82,905
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 66,686 66,686 66,686 66,686 66,686 66,686 66,686
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 83,266 83,266 83,266 83,266 83,266 83,266 83,266
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 89,013 89,013 89,013 89,013 89,013 89,013 89,013
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 73,586 73,586 73,586 73,586 73,586 73,586 73,586
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,489 12,489 12,489 12,489 12,489 12,489 12,489
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,549 17,549 17,549 17,549 17,549 17,549 17,549
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 22,921 22,921 22,921 22,921 22,921 22,921 22,921
11.26 RED SUMINISTRO PVC 1" ML ### 14,179 14,179 14,179 14,179 14,179 14,179 14,179
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,485 8,485 8,485 8,485 8,485 8,485 8,485
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 50,971 50,971 50,971 50,971 50,971 50,971 50,971
11.29 RED SUMINISTRO PVC 2" ML ### 32,634 32,634 32,634 32,634 32,634 32,634 32,634
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,616 10,616 10,616 10,616 10,616 10,616 10,616
11.31 RED SANITARIA PVC-S 2" ML ### 25,239 25,239 25,239 25,239 25,239 25,239 25,239
11.32 RED SANITARIA PVC-S 3" ML ### 34,991 34,991 34,991 34,991 34,991 34,991 34,991
11.33 RED SANITARIA PVC-S 4" ML ### 47,467 47,467 47,467 47,467 47,467 47,467 47,467
11.34 RED SANITARIA PVC-S 6" ML ### 88,548 88,548 88,548 88,548 88,548 88,548 88,548
11.35 REGISTRO 1" UN ### 107,700 107,700 107,700 107,700 107,700 107,700 107,700
11.36 REGISTRO 1/2" UN ### 60,068 60,068 60,068 60,068 60,068 60,068 60,068
11.37 REGISTRO 3/4" UN ### 76,418 76,418 76,418 76,418 76,418 76,418 76,418
11.38 REGISTRO 1 1/2" UN ### 184,406 184,406 184,406 184,406 184,406 184,406 184,406
11.39 REGISTRO 2 1/2" UN ### 379,972 379,972 379,972 379,972 379,972 379,972 379,972
11.40 REGISTRO 2" UN ### 280,860 280,860 280,860 280,860 280,860 280,860 280,860
11.41 REVENTILACIÓN 2" ML ### 17,616 17,616 17,616 17,616 17,616 17,616 17,616
11.42 REVENTILACIÓN 3" ML ### 22,225 22,225 22,225 22,225 22,225 22,225 22,225
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN) UN ### 172,837 172,837 172,837 172,837 172,837 172,837 172,837
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11.44 UN ### p 281,056 281,056 281,056 281,056 281,056 281,056 281,056
ISNTALACIÓN) i
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E o
11.45 INSTALACIÓN) UN ### 467,502 467,502 467,502 467,502 467,502 467,502 467,502

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11.46 SOPORTES)
ML ### 40,428 40,428 40,428 40,428 40,428 40,428 40,428

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE


11.47 ACCESORIOS Y SOPORTES) ML ### 47,659 47,659 47,659 47,659 47,659 47,659 47,659

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS


11.48 Y SOPORTES) ML ### 61,272 61,272 61,272 61,272 61,272 61,272 61,272

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE


11.49 ACCESORIOS Y SOPORTES) ML ### 69,362 69,362 69,362 69,362 69,362 69,362 69,362
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11.50 ACCESORIOS Y SOPORTES) ML ### 89,362 89,362 89,362 89,362 89,362 89,362 89,362

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS


11.51 Y SOPORTES)
ML ### 103,709 103,709 103,709 103,709 103,709 103,709 103,709

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS


11.52 Y SOPORTES) ML ### 153,471 153,471 153,471 153,471 153,471 153,471 153,471

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 61,915 61,915 61,915 61,915 61,915 61,915 61,915
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,166 62,166 62,166 62,166 62,166 62,166 62,166
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 40,001 40,001 40,001 40,001 40,001 40,001 40,001
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 49,238 49,238 49,238 49,238 49,238 49,238 49,238
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE
11.57 HASTA 2" ML ### 4,165 4,165 4,165 4,165 4,165 4,165 4,165
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A
11.58 2" ML ### 6,557 6,557 6,557 6,557 6,557 6,557 6,557
11.59 GABINETE TIPO III UN ### 1,013,971 1,013,971 1,013,971 1,013,971 1,013,971 1,013,971 1,013,971
11.60 GABINETE TIPO I UN ### 775,359 775,359 775,359 775,359 775,359 775,359 775,359
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,598,608 2,598,608 2,598,608 2,598,608 2,598,608 2,598,608 2,598,608
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,166,952 2,166,952 2,166,952 2,166,952 2,166,952 2,166,952 2,166,952
11.63 VÁLVULA MARIPOSA 3" UN ### 631,026 631,026 631,026 631,026 631,026 631,026 631,026
11.64 VÁLVULA MARIPOSA 4" UN ### 815,757 815,757 815,757 815,757 815,757 815,757 815,757
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 313,250 313,250 313,250 313,250 313,250 313,250 313,250

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 363,108 363,108 363,108 363,108 363,108 363,108 363,108
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ###
i 57,691 57,691 57,691 57,691 57,691 57,691 57,691
p
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### i 68,255 68,255 68,255 68,255 68,255 68,255 68,255
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### o 75,833 75,833 75,833 75,833 75,833 75,833 75,833
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 89,263 89,263 89,263 89,263 89,263 89,263 89,263
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,261 54,261 54,261 54,261 54,261 54,261 54,261
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 61,833 61,833 61,833 61,833 61,833 61,833 61,833
12.8 STRIP TELEFÓNICO 10 PARES UN ### 142,980 142,980 142,980 142,980 142,980 142,980 142,980
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 55,700 55,700 55,700 55,700 55,700 55,700 55,700
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 127,950 127,950 127,950 127,950 127,950 127,950 127,950
12.11 SALIDA T.V PVC COMPLETA. UN ### 76,565 76,565 76,565 76,565 76,565 76,565 76,565
12.12 SALIDA BIFÁSICA C.N. UN ### 45,395 45,395 45,395 45,395 45,395 45,395 45,395
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 95,792 95,792 95,792 95,792 95,792 95,792 95,792
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 409,127 409,127 409,127 409,127 409,127 409,127 409,127
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 544,712 544,712 544,712 544,712 544,712 544,712 544,712
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,526 3,526 3,526 3,526 3,526 3,526 3,526
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,658 4,658 4,658 4,658 4,658 4,658 4,658
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,243 7,243 7,243 7,243 7,243 7,243 7,243
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,958 12,958 12,958 12,958 12,958 12,958 12,958
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 272,148 272,148 272,148 272,148 272,148 272,148 272,148
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 76,978 76,978 76,978 76,978 76,978 76,978 76,978
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 104,075 104,075 104,075 104,075 104,075 104,075 104,075
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,696 42,696 42,696 42,696 42,696 42,696 42,696
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,397,059 1,397,059 1,397,059 1,397,059 1,397,059 1,397,059 1,397,059
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,035,471 1,035,471 1,035,471 1,035,471 1,035,471 1,035,471 1,035,471
12.26 POSTE METÁLICO 6M UN ### 1,290,877 1,290,877 1,290,877 1,290,877 1,290,877 1,290,877 1,290,877
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 599,968 599,968 599,968 599,968 599,968 599,968 599,968
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 109,824 109,824 109,824 109,824 109,824 109,824 109,824
12.29 LUMINARIA 70W SODIO UN ### 503,291 503,291 503,291 503,291 503,291 503,291 503,291
12.30 LUMINARIA 150W SODIO UN ### 629,532 629,532 629,532 629,532 629,532 629,532 629,532
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,661,945 1,661,945 1,661,945 1,661,945 1,661,945 1,661,945 1,661,945
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,224,005 1,224,005 1,224,005 1,224,005 1,224,005 1,224,005 1,224,005

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 40,182 41,098 40,214 39,929 40,593 40,403 40,530
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,811 40,727 39,842 39,558 40,221 40,032 40,158
13.3 ALISTADO PARA LISTÓN M2 ### 14,854 15,037 14,860 14,803 14,936 14,898 14,924
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 28,796 30,629 28,859 28,291 29,618 29,239 29,491
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ###
i 85,704 87,537 85,768 85,199 86,526 86,147 86,400
p
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### i 26,964 27,600 26,986 26,789 27,249 27,118 27,205
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### o 58,509 61,598 58,616 57,657 59,894 59,255 59,681
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 81,190 86,132 81,360 79,827 83,406 82,383 83,065
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,447 30,447 30,447 30,447 30,447 30,447 30,447
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,113 23,113 23,113 23,113 23,113 23,113 23,113
13.11 PERMA PLY 2 CAPAS M2 ### 27,155 27,155 27,155 27,155 27,155 27,155 27,155
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 47,658 50,438 47,754 46,891 48,904 48,329 48,712
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 55,854 59,252 55,971 54,916 57,377 56,674 57,143
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 80,981 86,233 81,162 79,532 83,335 82,249 82,973
13.15 TRITURADO FINO 1/2 M3 ### 111,563 135,708 112,397 104,903 122,387 117,391 120,722
13.16 TRITURADO GRUESO 3/4 M3 ### 109,336 128,136 107,240 101,035 114,717 110,580 113,338

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,624 57,990 57,636 57,522 57,788 57,712 57,763
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,483 34,666 34,489 34,433 34,565 34,527 34,553
14.3 ADOQUÍN CONCRETO 6CM M2 ### 66,060 66,976 66,091 65,807 66,470 66,281 66,407
14.4 ADOQUÍN CONCRETO 8CM M2 ### 69,360 70,276 69,391 69,107 69,770 69,581 69,707
14.5 ADOQUÍN GRES PEATONAL M2 ### 73,661 74,577 73,692 73,408 74,071 73,882 74,008
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO M2 ### 75,807 76,173 75,819 75,706 75,971 75,895 75,946
14.7 GRAVILLA PARA GRADAS ML ### 37,800 38,211 37,815 37,687 37,984 37,899 37,956
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 165,234 166,883 165,290 164,779 165,973 165,632 165,859
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 47,301 48,305 47,336 47,024 47,751 47,543 47,682
14.10 GUARDAESCOBA EN GRANITO ML ### 44,257 44,257 44,257 44,257 44,257 44,257 44,257
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,481 10,891 10,495 10,368 10,665 10,580 10,637
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,415 9,415 9,415 9,415 9,415 9,415 9,415
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,629 12,629 12,629 12,629 12,629 12,629 12,629
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,609 10,609 10,609 10,609 10,609 10,609 10,609
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,715 17,715 17,715 17,715 17,715 17,715 17,715
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 34,436 34,436 34,436 34,436 34,436 34,436 34,436
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,339 9,339 9,339 9,339 9,339 9,339 9,339
14.18 LISTÓN M.H. AMARILLO M2 ### 74,900 74,900 74,900 74,900 74,900 74,900 74,900
14.19 PASO ESCALERA GRANITO ML ### 119,937 121,220 119,981 119,583 120,512 120,247 120,423
14.20 PIRLANES ALUMINIO ML ### 7,651 7,651 7,651 7,651 7,651 7,651 7,651
14.21 PIRLANES LADRILLO ML ### 32,655 33,048 32,669 32,547 32,831 32,750 32,804
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ###
i 46,117 46,117 46,117 46,117 46,117 46,117 46,117
p
14.23 PISO VINILO TRÁFICO PESADO M2 ### i 53,556 53,556 53,556 53,556 53,556 53,556 53,556
14.24 PULIDA LACADA PISO MADERA M2 ### o 49,580 49,580 49,580 49,580 49,580 49,580 49,580
14.25 TABLETA DE GRES 25X25 M2 ### 50,028 50,395 50,041 49,927 50,192 50,117 50,167
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,097 56,463 56,110 55,996 56,261 56,185 56,236
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,067 11,067 11,067 11,067 11,067 11,067 11,067
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 50,387 50,977 50,407 50,224 50,651 50,529 50,610
14.29 JABONERA PORCELANA ACUARIO UN ### 20,729 20,729 20,729 20,729 20,729 20,729 20,729
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE)
UN ### 123,901 123,901 123,901 123,901 123,901 123,901 123,901
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,065 10,065 10,065 10,065 10,065 10,065 10,065
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,648 22,648 22,648 22,648 22,648 22,648 22,648
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,576 14,576 14,576 14,576 14,576 14,576 14,576
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,165 14,165 14,165 14,165 14,165 14,165 14,165
14.35 REMATES BOCEL ALUMINIO ML ### 8,659 8,659 8,659 8,659 8,659 8,659 8,659
14.36 REMATES BOCEL PORCELANA ML ### 8,809 8,809 8,809 8,809 8,809 8,809 8,809
14.37 TAPA REGISTRO 20X20 UN ### 19,207 19,207 19,207 19,207 19,207 19,207 19,207
14.38 TAPA REGISTRO 6X6 UN ### 17,515 17,515 17,515 17,515 17,515 17,515 17,515
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL
14.39 N.5 M2 ### 18,712 18,712 18,712 18,712 18,712 18,712 18,712

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL


14.40 FUNDIDO EN SITIO M2 ### 21,632 21,632 21,632 21,632 21,632 21,632 21,632

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 65,737 66,103 65,749 65,635 65,901 65,825 65,876
14.42 MEDIA CAÑA EN GRANITO ML ### 77,730 77,730 77,730 77,730 77,730 77,730 77,730
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,614 34,614 34,614 34,614 34,614 34,614 34,614
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,374 13,374 13,374 13,374 13,374 13,374 13,374
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 101,969 101,969 101,969 101,969 101,969 101,969 101,969
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 123,539 123,539 123,539 123,539 123,539 123,539 123,539

15 CIELO RASO
15.1 APLIQUE YESO ML ### 73,049 73,049 73,049 73,049 73,049 73,049 73,049
15.2 ARMADURA MADERA Y MALLA M2 ### 36,354 36,354 36,354 36,354 36,354 36,354 36,354
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 55,861 55,861 55,861 55,861 55,861 55,861 55,861
15.4 CIELO RASO DURACUSTIC M2 ### 68,456 68,456 68,456 68,456 68,456 68,456 68,456
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,130 51,130 51,130 51,130 51,130 51,130 51,130
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 94,636 94,636 94,636 94,636 94,636 94,636 94,636
15.7 CORNISAS YESO ML ### 49,008 49,008 49,008 49,008 49,008 49,008 49,008
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ###
i 104,520 104,520 104,520 104,520 104,520 104,520 104,520
p
15.9 MALLA CON VENA M2 ### i 13,600 13,600 13,600 13,600 13,600 13,600 13,600
o
16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
16.2 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 43,707 43,707 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987 49,987 49,987

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005 85,005 85,005

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 77,183 72,043 65,189 65,189 61,762 61,762 61,762
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 115,910 140,902 116,772 109,016 127,113 121,942 125,389
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 166,560 161,420 154,567 154,567 151,140 151,140 151,140
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 79,383 74,243 63,986 67,389 63,962 63,962 63,962
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 154,593 149,453 142,600 142,600 139,173 139,173 139,173
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 163,530 158,389 151,536 151,536 148,109 148,109 148,109

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 303,066 303,066 303,066 303,066 303,066 303,066 303,066
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 GRIFERÍA) UN ### 891,968 891,968 891,968 891,968 891,968 891,968 891,968

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 483,606 483,606 483,606 483,606 483,606 483,606 483,606
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE
17.4 GRIFERÍA) UN ### 140,834 140,834 140,834 140,834 140,834 140,834 140,834
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE
17.5 GRIFERÍA)
UN ### 196,765 196,765 196,765 196,765 196,765 196,765 196,765
SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
17.6 GRIFERÍA) UN ### 182,791 182,791 182,791 182,791 182,791 182,791 182,791

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 401,459 401,459 401,459 401,459 401,459 401,459 401,459
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
17.8 GRIFERÍA)
UN ### p 1,025,661 1,025,661 1,025,661 1,025,661 1,025,661 1,025,661 1,025,661
i
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### o 291,841 291,841 291,841 291,841 291,841 291,841 291,841
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A
17.10 BAÑERA UN ### 207,056 207,056 207,056 207,056 207,056 207,056 207,056
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 82,823 82,823 82,823 82,823 82,823 82,823 82,823
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 250,435 250,435 250,435 250,435 250,435 250,435 250,435
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 368,546 368,546 368,546 368,546 368,546 368,546 368,546

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,396 8,396 8,396 8,396 8,396 8,396 8,396
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,107 3,107 3,107 3,107 3,107 3,107 3,107
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,210 11,210 11,210 11,210 11,210 11,210 11,210
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,463 42,463 42,463 42,463 42,463 42,463 42,463
18.5 CARBURO SOBRE PAÑETES M2 ### 5,875 5,875 5,875 5,875 5,875 5,875 5,875
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 65,805 65,805 65,805 65,805 65,805 65,805 65,805
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,498 3,498 3,498 3,498 3,498 3,498 3,498
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,790 2,790 2,790 2,790 2,790 2,790 2,790
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,025 14,025 14,025 14,025 14,025 14,025 14,025
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,059 4,059 4,059 4,059 4,059 4,059 4,059
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,786 14,786 14,786 14,786 14,786 14,786 14,786
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,765 5,765 5,765 5,765 5,765 5,765 5,765
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,564 6,564 6,564 6,564 6,564 6,564 6,564
18.14 ESTUCO M2 ### 7,072 7,072 7,072 7,072 7,072 7,072 7,072
18.15 ESTUCO (LINEAL) ML ### 4,431 4,431 4,431 4,431 4,431 4,431 4,431
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,617 15,617 15,617 15,617 15,617 15,617 15,617
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,687 9,687 9,687 9,687 9,687 9,687 9,687
18.18 LACA PISOS MADERA M2 ### 22,931 22,931 22,931 22,931 22,931 22,931 22,931
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,704 2,704 2,704 2,704 2,704 2,704 2,704
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,221 12,221 12,221 12,221 12,221 12,221 12,221
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,299 3,299 3,299 3,299 3,299 3,299 3,299
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,670 12,670 12,670 12,670 12,670 12,670 12,670
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,128 7,128 7,128 7,128 7,128 7,128 7,128
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,484 4,484 4,484 4,484 4,484 4,484 4,484
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ###
i 21,901 21,901 21,901 21,901 21,901 21,901 21,901
p
18.26 PINTURA EPÓXICA M2 ### i 12,767 12,767 12,767 12,767 12,767 12,767 12,767
18.27 PINTURA EPÓXICA (LINEAL) ML ### o 7,893 7,893 7,893 7,893 7,893 7,893 7,893

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,069,901 6,069,901 6,069,901 6,069,901 6,069,901 6,069,901 6,069,901
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,724,588 ### 10,724,588 10,724,588 ### 10,724,588 10,724,588
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,806,719 2,806,719 2,806,719 2,806,719 2,806,719 2,806,719 2,806,719
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,172,351 9,172,351 9,172,351 9,172,351 9,172,351 9,172,351 9,172,351
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,589,236 8,589,236 8,589,236 8,589,236 8,589,236 8,589,236 8,589,236
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,704 2,704 2,704 2,704 2,704 2,704 2,704
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 861,798 861,798 861,798 861,798 861,798 861,798 861,798
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 86,054 86,054 86,054 86,054 86,054 86,054 86,054
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,559,009 1,559,327 1,559,020 1,558,921 1,559,151 1,559,086 1,559,130
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 679,399 686,996 679,661 677,303 682,804 681,232 682,280

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,453 29,453 29,453 29,453 29,453 29,453 29,453
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 43,734 43,734 43,734 43,734 43,734 43,734 43,734
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 54,211 54,211 54,211 54,211 54,211 54,211 54,211
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20.4 ACCESORIOS)
ML ### 17,692 17,692 17,692 17,692 17,692 17,692 17,692
TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE
20.5 ACCESORIOS) ML ### 21,424 21,424 21,424 21,424 21,424 21,424 21,424

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,202 29,202 29,202 29,202 29,202 29,202 29,202
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,194 26,194 26,194 26,194 26,194 26,194 26,194
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,613 27,613 27,613 27,613 27,613 27,613 27,613
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,517 34,517 34,517 34,517 34,517 34,517 34,517
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,677 17,677 17,677 17,677 17,677 17,677 17,677
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,164 23,164 23,164 23,164 23,164 23,164 23,164
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,615 35,615 35,615 35,615 35,615 35,615 35,615
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 272,884 272,884 272,884 272,884 272,884 272,884 272,884
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 314,040 314,040 314,040 314,040 314,040 314,040 314,040
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 327,561 327,561 327,561 327,561 327,561 327,561 327,561
20.16 ACOMETIDA GAS 1/2" ML ### 303,971 303,971 303,971 303,971 303,971 303,971 303,971
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
21.1 INSTALACIONES RED VOZ Y DATOS
i
p
21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### i 221,894 221,894 221,894 221,894 221,894 221,894 221,894
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### o 33,986 33,986 33,986 33,986 33,986 33,986 33,986
21.3 SIRENA DE 110 V UN ### 103,669 103,669 103,669 103,669 103,669 103,669 103,669
21.4 CÁMARA CCTV UN ### 263,881 263,881 263,881 263,881 263,881 263,881 263,881
21.5 PARLANTE-CIELO FALSO UN ### 52,164 52,164 52,164 52,164 52,164 52,164 52,164
21.6 AMPLIFICADOR 100W UN ### 574,015 574,015 574,015 574,015 574,015 574,015 574,015
21.7 AMPLIFICADOR 300W UN ### 1,421,949 1,421,949 1,421,949 1,421,949 1,421,949 1,421,949 1,421,949
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,129 45,129 45,129 45,129 45,129 45,129 45,129
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 221,867 221,867 221,867 221,867 221,867 221,867 221,867
21.10 TOMA PARA MICRÓFONO UN ### 44,156 44,156 44,156 44,156 44,156 44,156 44,156
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,770 3,770 3,770 3,770 3,770 3,770 3,770
21.12 SPLITERS UN ### 6,323 6,323 6,323 6,323 6,323 6,323 6,323
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,737 18,737 18,737 18,737 18,737 18,737 18,737
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,542 24,542 24,542 24,542 24,542 24,542 24,542
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 31,848 31,848 31,848 31,848 31,848 31,848 31,848
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 122,938 122,938 122,938 122,938 122,938 122,938 122,938
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,079 32,079 32,079 32,079 32,079 32,079 32,079
21.18 BANDEJA PORTACABLES PARA RACK UN ### 104,825 104,825 104,825 104,825 104,825 104,825 104,825
21.19 RACK 2' X 24" UN ### 184,512 184,512 184,512 184,512 184,512 184,512 184,512
21.20 RACK 3' X 24" UN ### 289,353 289,353 289,353 289,353 289,353 289,353 289,353
21.21 RACK 5' X 24" UN ### 359,711 359,711 359,711 359,711 359,711 359,711 359,711
21.22 RACK 7' X 24" UN ### 392,888 392,888 392,888 392,888 392,888 392,888 392,888
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 576,229 576,229 576,229 576,229 576,229 576,229 576,229
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 339,694 339,694 339,694 339,694 339,694 339,694 339,694
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 104,213 104,213 104,213 104,213 104,213 104,213 104,213
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 13,866 13,866 13,866 13,866 13,866 13,866 13,866
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,332 28,332 28,332 28,332 28,332 28,332 28,332
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,018 5,018 5,018 5,018 5,018 5,018 5,018
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,393 35,393 35,393 35,393 35,393 35,393 35,393
21.30 CANALETA METÁLICA 4X10 CMS ML ### 36,974 36,974 36,974 36,974 36,974 36,974 36,974
21.31 CANALETA METÁLICA 6X10 CMS ML ### 37,765 37,765 37,765 37,765 37,765 37,765 37,765
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,636 24,636 24,636 24,636 24,636 24,636 24,636
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,238 27,238 27,238 27,238 27,238 27,238 27,238
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,330 28,330 28,330 28,330 28,330 28,330 28,330
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 47,541 47,541 47,541 47,541 47,541 47,541 47,541
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
21.36 SWITCH 10/100/1000 24 PUERTOS UN ###
i 614,491 614,491 614,491 614,491 614,491 614,491 614,491
p
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### i 315,883 315,883 315,883 315,883 315,883 315,883 315,883
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### o 88,938 88,938 88,938 88,938 88,938 88,938 88,938
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,843 1,843 1,843 1,843 1,843 1,843 1,843
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,506 8,506 8,506 8,506 8,506 8,506 8,506
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,669 12,669 12,669 12,669 12,669 12,669 12,669
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,132 21,132 21,132 21,132 21,132 21,132 21,132
21.43 CABLE TELEVISIÓN RG6 ML ### 3,922 3,922 3,922 3,922 3,922 3,922 3,922
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,479 22,479 22,479 22,479 22,479 22,479 22,479
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,663 32,663 32,663 32,663 32,663 32,663 32,663
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,450 19,450 19,450 19,450 19,450 19,450 19,450
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN) ML ### 15,422 15,422 15,422 15,422 15,422 15,422 15,422
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 619,545 619,545 619,545 619,545 619,545 619,545 619,545
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 90,714 90,714 90,714 90,714 90,714 90,714 90,714
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 510,422 510,422 510,422 510,422 510,422 510,422 510,422
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,089,406 1,089,406 1,089,406 1,089,406 1,089,406 1,089,406 1,089,406
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 124,957 124,957 124,957 124,957 124,957 124,957 124,957
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 760,638 760,638 760,638 760,638 760,638 760,638 760,638
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,636,662 1,636,662 1,636,662 1,636,662 1,636,662 1,636,662 1,636,662
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,157 13,157 13,157 13,157 13,157 13,157 13,157
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,206 16,206 16,206 16,206 16,206 16,206 16,206
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,324 20,324 20,324 20,324 20,324 20,324 20,324
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,235 22,235 22,235 22,235 22,235 22,235 22,235
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,637 26,637 26,637 26,637 26,637 26,637 26,637
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,637 26,637 26,637 26,637 26,637 26,637 26,637
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 106,762 106,762 106,762 106,762 106,762 106,762 106,762
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 123,676 123,676 123,676 123,676 123,676 123,676 123,676
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 382,681 382,681 382,681 382,681 382,681 382,681 382,681
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 143,682 143,682 143,682 143,682 143,682 143,682 143,682
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 236,860 236,860 236,860 236,860 236,860 236,860 236,860
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,047,821 1,047,821 1,047,821 1,047,821 1,047,821 1,047,821 1,047,821
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,207,205 1,207,205 1,207,205 1,207,205 1,207,205 1,207,205 1,207,205
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,238 14,238 14,238 14,238 14,238 14,238 14,238
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,573 12,573 12,573 12,573 12,573 12,573 12,573
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 30,865 30,865 30,865 30,865 30,865 30,865 30,865
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 122,677 122,677 122,677 122,677 122,677 122,677 122,677
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 182,553 182,553 182,553 182,553 182,553 182,553 182,553
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 29,897 29,897 29,897 29,897 29,897 29,897 29,897
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 102,887 102,887 102,887 102,887 102,887 102,887 102,887
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 152,335 152,335 152,335 152,335 152,335 152,335 152,335
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,189 30,189 30,189 30,189 30,189 30,189 30,189
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 62,214 62,214 62,214 62,214 62,214 62,214 62,214
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 250,303 250,303 250,303 250,303 250,303 250,303 250,303
1.32 UNIÓN REPARACION PVC 4" UN ### 72,566 72,566 72,566 72,566 72,566 72,566 72,566
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 291,177 291,177 291,177 291,177 291,177 291,177 291,177
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 174,893 174,893 174,893 174,893 174,893 174,893 174,893
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 496,919 496,919 496,919 496,919 496,919 496,919 496,919
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
1.36 VÁLVULA COMPUERTA ELÁSTICA 6"
i
UN ### 1,329,921 1,329,921 1,329,921 1,329,921 1,329,921 1,329,921 1,329,921
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 1,965,059 1,965,059 1,965,059 1,965,059 1,965,059 1,965,059 1,965,059
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,797 10,797 10,797 10,797 10,797 10,797 10,797
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,689 24,689 24,689 24,689 24,689 24,689 24,689
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 99,110 123,723 99,959 92,320 110,143 105,051 108,446
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 72,148 67,008 60,155 60,155 56,728 56,728 56,728
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 84,443 79,302 69,045 72,449 69,022 69,022 69,022
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 77,071 73,996 80,384 107,358 67,847 67,847 67,847
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 93,053 89,919 85,740 85,740 75,293 83,651 73,203
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 113,036 138,608 113,919 105,982 124,499 119,210 122,737

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 114,123 114,123 114,123 114,123 114,123 114,123 114,123
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,189,204 1,189,204 1,189,204 1,189,204 1,189,204 1,189,204 1,189,204
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 149,117 149,117 149,117 149,117 149,117 149,117 149,117
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,377,386 1,377,386 1,377,386 1,377,386 1,377,386 1,377,386 1,377,386
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 960,078 960,078 960,078 960,078 960,078 960,078 960,078
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,584 62,584 62,584 62,584 62,584 62,584 62,584
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 113,289 113,289 113,289 113,289 113,289 113,289 113,289
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 267,436 267,436 267,436 267,436 267,436 267,436 267,436
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 267,429 267,429 267,429 267,429 267,429 267,429 267,429
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 429,318 429,318 429,318 429,318 429,318 429,318 429,318
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 113,337 113,337 113,337 113,337 113,337 113,337 113,337
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 113,337 113,337 113,337 113,337 113,337 113,337 113,337
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 267,436 267,436 267,436 267,436 267,436 267,436 267,436
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 267,436 267,436 267,436 267,436 267,436 267,436 267,436
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 429,318 429,318 429,318 429,318 429,318 429,318 429,318
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 431,791 431,791 431,791 431,791 431,791 431,791 431,791
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 700,607 700,607 700,607 700,607 700,607 700,607 700,607
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,124,257 1,124,257 1,124,257 1,124,257 1,124,257 1,124,257 1,124,257
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 69,484 69,484 69,484 69,484 69,484 69,484 69,484
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 361,455 361,455 361,455 361,455 361,455 361,455 361,455
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 404,582 404,582 404,582 404,582 404,582 404,582 404,582
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,120,140 1,120,140 1,120,140 1,120,140 1,120,140 1,120,140 1,120,140
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 65,745 66,008 65,754 65,672 65,863 65,808 65,845
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 327,750 327,750 327,750 327,750 327,750 327,750 327,750
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 49,824 49,824 49,824 49,824 49,824 49,824 49,824
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 70,438 70,438 70,438 70,438 70,438 70,438 70,438
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 101,616 101,616 101,616 101,616 101,616 101,616 101,616
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 155,969 155,969 155,969 155,969 155,969 155,969 155,969
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 250,606 250,606 250,606 250,606 250,606 250,606 250,606
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 364,028 364,028 364,028 364,028 364,028 364,028 364,028
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 460,545 460,545 460,545 460,545 460,545 460,545 460,545
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 605,497 605,497 605,497 605,497 605,497 605,497 605,497
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 832,606 832,606 832,606 832,606 832,606 832,606 832,606

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO) UN ### 672,070 690,303 672,699 667,041 680,244 676,471 678,986
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.
4.2 PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML ### 650,458 662,131 650,860 647,237 655,690 653,276 654,885
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
4.3 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 713,521 725,676 713,940 710,168 718,970 716,455 718,132
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI
4.4 CON REFUERZO) UN ### 798,181 820,972 798,967 791,895 808,398 803,682 806,826
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
4.5 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 922,886 939,324 923,453 918,352 930,255 926,855 929,121
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4.6 REFUERZO (INCLUYE ARO Y TAPA HF)
UN ### 824,295 841,008 824,871 819,685 831,787 828,329 830,634
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 995,009 1,003,734 995,309 992,600 998,919 997,114 998,319
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,445,705 1,471,180 1,446,582 1,438,674 1,457,123 1,451,853 1,455,369
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,979,050 2,027,249 1,980,712 1,965,753 2,000,656 1,990,684 1,997,332
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,633,704 2,713,824 2,636,466 2,611,601 2,669,620 2,653,043 2,664,094
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,824,357 1,824,357 1,824,357 1,824,357 1,824,357 1,824,357 1,824,357
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,856,597 3,856,597 3,856,597 3,856,597 3,856,597 3,856,597 3,856,597
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 138,508 138,984 138,524 138,376 138,721 138,623 138,688

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 73,981 75,357 74,028 73,601 74,598 74,313 74,503
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 87,397 88,773 87,444 87,017 88,014 87,729 87,919
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 56,535 59,779 56,647 55,640 57,989 57,318 57,765
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 61,241 64,432 61,351 60,361 62,672 62,012 62,452
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ###
i 61,350 64,434 61,456 60,499 62,733 62,094 62,520
p
5.6 BORDE SEPARADOR VERDE A-170 ML ### i 252,155 252,632 252,172 252,024 252,369 252,270 252,336
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### o 18,498 18,888 18,512 18,391 18,673 18,592 18,646
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,462 42,748 40,541 39,832 41,487 41,014 41,329
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 83,044 83,299 83,053 82,974 83,158 83,105 83,141
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 556,083 562,953 556,320 554,188 559,163 557,741 558,689
5.11 LOSETA PREFABRICADA A-40 M2 ### 62,516 63,606 62,554 62,215 63,005 62,779 62,930
5.12 LOSETA PREFABRICADA A-60 M2 ### 90,420 91,510 90,457 90,119 90,909 90,683 90,833
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 33,621 34,898 33,665 33,269 34,194 33,929 34,105

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 54,199 56,782 54,288 53,487 55,357 54,822 55,179
5.15 SARDINEL PREFABRICADO A-10 ML ### 101,234 100,892 99,850 99,771 99,558 99,505 99,540
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,090 60,750 60,113 59,908 60,386 60,249 60,340

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 202,119 203,638 202,171 201,700 202,800 202,486 202,695
6.2 BANCA EN CONCRETO M-30 UN ### 662,188 664,315 662,261 661,601 663,141 662,701 662,994
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 213,479 213,797 213,490 213,391 213,621 213,555 213,599
6.4 BOLARDO M-60 CONCRETO UN ### 161,569 163,392 161,632 161,066 162,386 162,009 162,261
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 163,437 165,260 163,500 162,934 164,254 163,877 164,128
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 191,415 193,323 191,481 190,889 192,270 191,875 192,139
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 59,360 60,415 59,397 59,070 59,833 59,615 59,760
6.8 BORDILLO PREFABRICADO A-80 ML ### 68,401 69,581 68,442 68,075 68,930 68,686 68,849
6.9 CANECA M-120 UN ### 309,591 309,854 309,600 309,518 309,709 309,654 309,691
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 816,371 817,283 816,403 816,120 816,780 816,591 816,717
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,346,428 3,347,036 3,346,449 3,346,261 3,346,701 3,346,575 3,346,659
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,442,488 3,443,096 3,442,509 3,442,321 3,442,761 3,442,635 3,442,719
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 481,594 482,230 481,616 481,419 481,880 481,748 481,836
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 638,506 641,050 638,593 637,804 639,646 639,120 639,471
6.15 BANCA EN MADERA M-50 UN ### 529,874 529,874 529,874 529,874 529,874 529,874 529,874
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 246,451 247,362 246,482 246,199 246,859 246,671 246,797
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 570,679 571,338 570,702 570,497 570,974 570,838 570,929
6.18 POSTE HISTÓRICO M-131 UN ### 6,362,281 6,366,839 6,362,438 6,361,024 6,364,324 6,363,381 6,364,010

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,999 3,999 3,999 3,999 3,999 3,999 3,999
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ###
i 43,048 43,048 43,048 43,048 43,048 43,048 43,048
p
7.3 SEÑAL DOBLE DE CICLORUTA UN ### i 310,909 311,148 310,918 310,844 311,016 310,967 311,000
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### o 490,367 491,640 490,411 490,017 490,938 490,675 490,850
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 233,205 233,443 233,213 233,139 233,311 233,262 233,295
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 247,617 247,855 247,625 247,551 247,723 247,674 247,707
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 258,531 258,769 258,539 258,465 258,637 258,588 258,621
7.8 TACHAS REFLECTIVAS UN ### 13,444 13,444 13,444 13,444 13,444 13,444 13,444
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,354 14,354 14,354 14,354 14,354 14,354 14,354
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 116,684 116,684 116,684 116,684 116,684 116,684 116,684
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO
1.1 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548 9,548 9,548

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,228 35,228 35,228 35,228 35,228 35,228 35,228

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y


2.3 210.2.2 PRÉSTAMOS
M3 ### 8,749 8,749 8,749 8,749 8,749 8,749 8,749

2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499 7,499 7,499
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 EXISTENTE M2 ### 481 481 481 481 481 481 481

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE


2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832 12,832 12,832 12,832

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 20,948 20,948 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 64,852 64,852 64,852 64,852 64,852 64,852 64,852
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 79,625 79,625 79,625 79,625 79,625 79,625 79,625
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO
2.12 600.4 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,035 19,035 19,035 19,035 19,035 19,035 19,035
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO
2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### p 39,738 39,738 39,738 39,738 39,738 39,738 39,738
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE
2.14 600.5 M3 ### o 31,203 31,203 31,203 31,203 31,203 31,203 31,203
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO
2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 53,644 53,644 53,644 53,644 53,644 53,644 53,644

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366 5,366 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 154,593 149,453 142,600 142,600 139,173 139,173 139,173
3.3 330.1 BASE GRANULAR M3 ### 163,530 158,389 151,536 151,536 148,109 148,109 148,109
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,190 3,190 3,190 3,190 3,190 3,190 3,190
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,113 1,113 1,113 1,113 1,113 1,113 1,113
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
3.7 461.1 ASFÁLTICA
M3 ### 226,517 233,084 226,744 224,706 229,461 228,102 229,008
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 66,110 67,802 66,168 65,643 66,869 66,519 66,752
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO) M3 ### 545,907 544,259 559,087 545,907 532,727 536,022 529,432
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3.10 450.2 P ASFÁLTICO) M3 ### 572,682 571,034 585,862 572,682 559,502 562,797 556,207
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3.11 450.9 P ASFÁLTICO) M3 ### 609,129 607,482 622,309 609,129 595,949 599,244 592,654
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3.12 450.3 P ASFÁLTICO) M3 ### 580,119 578,472 593,299 580,119 566,939 570,234 563,644
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 348,598 359,909 328,887 336,741 355,245 343,971 356,567
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 309,623 304,483 297,629 297,629 294,202 294,202 294,202
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 299,627 294,487 287,634 287,634 284,207 284,207 284,207
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 38,111 38,111 38,111 38,111 38,111 38,111 38,111
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 168,912 168,912 168,912 168,912 168,912 168,912 168,912
3.15 311.1 AFIRMADO M3 ### 79,383 74,243 63,986 67,389 63,962 63,962 63,962
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,862 12,331 11,878 11,733 12,072 11,975 12,040
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,794 5,029 4,802 4,730 4,899 4,851 4,883
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 638,408 667,154 639,400 630,479 651,294 645,346 649,312
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE
3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 670,469 700,502 671,505 662,185 683,932 677,718 681,861
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE
3.20 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### p 691,722 722,588 692,787 683,208 705,559 699,172 703,430
i
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
3.21 *** ML ### o 7,013 7,013 7,013 7,013 7,013 7,013 7,013
LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 126,989 122,639 116,840 116,840 102,342 113,941 99,443

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 913,783 946,390 914,908 904,788 928,400 921,653 926,151
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 787,844 819,910 788,950 778,998 802,218 795,584 800,007
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 834,231 867,567 835,381 825,035 849,174 842,277 846,876
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 571,214 600,884 572,237 563,029 584,514 578,375 582,468
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 667,434 698,279 668,497 658,924 681,261 674,879 679,134
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 570,171 600,863 571,230 561,705 583,929 577,580 581,812
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 666,350 698,257 667,450 657,549 680,653 674,052 678,452
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 729,202 759,894 730,261 720,737 742,961 736,611 740,844
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 589,767 621,674 590,867 580,966 604,070 597,469 601,869
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 773,267 805,174 774,367 764,466 787,570 780,968 785,369
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE
4.11 650 P DE ACERO A-36 KG ### 11,835 11,835 11,835 11,835 11,835 11,835 11,835

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE


4.12 650 P DE ACERO A-588 GRADO B
KG ### 15,160 15,160 15,160 15,160 15,160 15,160 15,160
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,781 1,781 1,781 1,781 1,781 1,781 1,781
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,668,766 2,668,766 2,668,766 2,668,766 2,668,766 2,668,766 2,668,766
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M.
4.15 621.1 P CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO ML ### 4,113,609 4,169,384 4,115,533 4,098,223 4,138,612 4,127,072 4,134,765
DE MATERIAL, REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4.16 621.2 REFUERZO) M3 ### 1,720,287 1,750,675 1,721,335 1,711,905 1,733,909 1,727,622 1,731,813
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 86,351 86,351 86,351 86,351 86,351 86,351 86,351
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 358,525 362,171 358,651 357,519 360,159 359,405 359,908
4.19 632 P BARANDA METÁLICA ML ### 420,004 420,004 420,004 420,004 420,004 420,004 420,004
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,781 16,781 16,781 16,781 16,781 16,781 16,781
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 490,136 518,790 481,758 473,978 494,909 488,327 492,716
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 95,698 91,349 96,750 125,556 82,650 82,650 82,650
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 77,293 72,548 66,222 66,222 63,058 63,058 63,058
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 384,591 416,710 385,699 375,731 398,989 392,343 396,774
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 377,627 395,126 374,594 368,673 377,218 377,487 374,848
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.26 630.7 M3 ### p 386,270 403,769 383,237 377,316 385,861 386,130 383,491
ELEVACIONES
i
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### o 390,945 407,898 387,895 382,142 390,292 390,675 387,959
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 399,588 416,541 396,538 390,785 398,935 399,318 396,602
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 519,290 550,490 520,367 510,684 533,277 526,822 531,125
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 613,676 646,112 614,795 604,729 628,217 621,506 625,980
4.31 681.1 GAVIÓN M3 ### 212,627 208,476 202,940 202,940 189,101 200,172 186,333
4.32 681.1 GAVIÓN MALLA PVC M3 ### 216,741 212,590 207,054 207,054 193,215 204,286 190,447
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4.33 672.1 2500 PSI ML ### 42,395 44,310 42,461 41,867 43,254 42,858 43,122

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE


4.34 672.1 E, 2500 PSI ML ### 16,365 17,322 16,398 16,100 16,794 16,596 16,728
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
4.35 *** (RESISTENCIA ÚLTIMA 25 KN) M2 ### 10,025 10,025 10,025 10,025 10,025 10,025 10,025

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,271 14,271 14,271 14,271 14,271 14,271 14,271

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,189 19,189 19,189 19,189 19,189 19,189 19,189

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE


4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 ### 22,994 22,994 22,994 22,994 22,994 22,994 22,994
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 29,532 29,532 29,532 29,532 29,532 29,532 29,532

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800


4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,195 7,195 7,195 7,195 7,195 7,195 7,195

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,193 8,193 8,193 8,193 8,193 8,193 8,193

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,515 8,515 8,515 8,515 8,515 8,515 8,515

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700


4.43 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,076 6,076 6,076 6,076 6,076 6,076 6,076

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100


4.44 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,133 9,133 9,133 9,133 9,133 9,133 9,133

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400


4.45 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,454 7,454 7,454 7,454 7,454 7,454 7,454

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400


4.46 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,133 9,133 9,133 9,133 9,133 9,133 9,133
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000
4.47 *** M2 ### p 17,514 17,514 17,514 17,514 17,514 17,514 17,514
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) i
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO o
4.48 661.1 Ø=36" CLASE I, INCLUYE EMBOQUILLADA ML ### 623,734 624,142 623,748 623,622 623,917 623,833 623,889
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
4.49 660.3 DIÁMETRO 600 MM
ML ### 358,834 365,671 359,070 356,948 361,899 360,484 361,428

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,


4.50 *** DIÁMETRO 36" ML ### 872,444 872,444 872,444 872,444 872,444 872,444 872,444

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 148,168 143,225 133,363 136,635 133,340 133,340 133,340
SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000
4.52 640.1 PSI KG ### 4,382 4,382 4,382 4,382 4,382 4,382 4,382

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E


4.53 *** INSTALACIÓN) ML ### 84,904 84,904 84,904 84,904 84,904 84,904 84,904

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E


4.54 *** INSTALACIÓN) ML ### 129,340 129,340 129,340 129,340 129,340 129,340 129,340
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 528,013 560,449 529,132 519,066 542,554 535,843 540,317
4.56 682.1 P COLCHONETA RENO M3 ### 228,492 224,340 218,804 218,804 204,965 216,037 202,198
4.57 *** TRINCHO EN MADERA M2 ### 67,204 67,204 67,204 67,204 67,204 67,204 67,204

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,999 3,999 3,999 3,999 3,999 3,999 3,999
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,048 43,048 43,048 43,048 43,048 43,048 43,048
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 82,823 82,823 82,823 82,823 82,823 82,823 82,823
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 68,915 68,915 68,915 68,915 68,915 68,915 68,915
5.5 730.1 DEFENSA METÁLICA ML ### 147,117 148,660 147,170 146,691 147,809 147,489 147,702
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES UN ### 13,444 13,444 13,444 13,444 13,444 13,444 13,444

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 835 835 835 835 835 835 835
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
6.2 801.6 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES UN ### 131,984 131,984 131,984 131,984 131,984 131,984 131,984
A UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE
6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM ML ### 25,566 25,566 25,566 25,566 25,566 25,566 25,566
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,310 8,310 8,310 8,310 8,310 8,310 8,310
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera
i
ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5
6.5 801.1 HA ### p 448,890 448,890 448,890 448,890 448,890 448,890 448,890
KM)
i
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 M2 ### o 1,804 1,804 1,804 1,804 1,804 1,804 1,804
SOBRANTES A UNA DISTANCIA DE 5 KM)
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,319 15,319 15,319 15,319 15,319 15,319 15,319
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,756 24,756 24,756 24,756 24,756 24,756 24,756
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,436 9,436 9,436 9,436 9,436 9,436 9,436

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
CONSTRUCCIÓN

2,026,756 2,032,866 2,011,482


1,179,750 1,182,805 1,172,113
14,113 14,113 14,113
15,821 15,821 15,821
18,298 18,298 18,298
65,434 65,434 65,434
46,322 46,388 46,157
21,671 21,736 21,506
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
10,480 10,480 10,480
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
902,490 902,850 900,447
10,379 10,379 10,379
3,743 3,743 3,743
2,676,226 2,676,226 2,676,226
247,794 247,794 247,794
9,189 9,189 9,189

91,214 86,073 84,360


244,008 250,561 227,628
297,878 297,878 297,878
207,425 207,425 207,425
22,077 22,077 22,077
670,866 677,341 654,677
673,535 680,221 656,821
627,602 633,862 611,951
49,656 49,656 49,656
153,134 153,134 153,134

190,916 190,916 190,916

236,606 236,606 236,606

298,111 298,111 298,111


106,839 107,292 105,706
132,260 132,917 130,618
613,453 619,713 597,802
91,623 91,623 91,623

38,559 38,600 38,457


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
197,680 197,720 197,578
461,603 461,559 452,216
228,761 229,342 226,507
262,465 263,431 258,791
347,546 349,416 341,613
104,506 104,476 104,466
1,278,106 1,277,808 1,277,708
118,425 118,874 117,301
74,340 74,577 73,747
28,529 28,646 28,235
45,476 45,594 45,183
59,722 59,887 59,311
81,480 81,668 81,010
112,111 112,275 111,699
965,272 967,152 960,572

1,370,902 1,374,663 1,361,502

1,801,298 1,808,820 1,782,497

42,120 42,120 42,120


55,580 55,580 55,580
833,448 839,709 817,798
279,114 281,793 267,612
100,980 101,588 99,461

119,126 119,856 117,303

133,831 134,804 131,400

141,235 142,268 138,652

162,212 163,488 159,021


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

180,584 182,043 176,937

200,517 202,158 196,415


99,716 99,817 99,464
980,993 987,254 965,342
95,411 95,495 95,202
82,060 82,686 80,495
92,566 93,331 90,651
108,159 109,119 105,758
733,055 739,315 717,404
50,212 50,404 49,733
293,620 296,416 286,630
4,179 4,179 4,179
4,382 4,382 4,382
6,158 6,158 6,158
879,989 886,249 864,338
806,956 813,808 789,824
873,895 880,155 858,244
853,813 860,074 838,162
1,064,276 1,070,536 1,048,625
354,253 361,245 336,773

30,566 30,734 30,145


50,943 51,112 50,522
35,347 35,388 35,246
164,647 164,729 164,444
45,005 45,196 44,525
27,509 27,593 27,300
100,211 100,374 99,804
93,701 94,340 92,103
91,425 91,425 91,425
53,636 53,636 53,636
88,055 88,055 88,055
51,951 51,951 51,951
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
102,043 102,043 102,043
60,266 60,266 60,266
113,479 113,479 113,479
65,985 65,985 65,985
41,337 41,419 41,133
24,982 25,023 24,880
53,450 53,505 53,314
32,104 32,132 32,036
60,079 60,134 59,943
36,092 36,120 36,024
101,171 101,444 100,489
59,665 59,801 59,324
37,742 37,796 37,606
22,852 22,879 22,784
75,075 75,184 74,802
45,199 45,253 45,062
88,421 88,504 88,212
53,549 53,591 53,444
184,764 185,145 183,809
110,776 110,967 110,299
90,616 90,774 90,221
54,646 54,726 54,449
47,820 47,942 47,515
29,009 29,070 28,856
34,235 34,290 34,099
20,823 20,851 20,755
51,887 51,996 51,615
31,725 31,779 31,588
99,732 99,896 99,323
60,614 60,696 60,410
72,712 72,821 72,439
43,839 43,893 43,702
153,962 154,344 153,008
93,375 93,566 92,898
32,088 32,128 31,986
36,995 37,108 36,710
62,289 62,441 61,910
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
5,247 5,247 5,247
51,305 51,473 50,883
10,604 10,604 10,604
13,975 13,975 13,975
18,250 18,250 18,250
25,487 25,487 25,487
37,921 37,921 37,921
5,141 5,188 5,024

16,148 16,148 16,148


6,047 6,088 5,945
7,233 7,273 7,131
8,509 8,550 8,407
6,830 6,830 6,830
13,695 13,695 13,695
24,828 24,939 24,551
15,008 15,063 14,870
21,944 22,058 21,657
13,256 13,313 13,113
20,937 21,048 20,660
12,752 12,808 12,614
21,944 22,058 21,657
13,256 13,313 13,113
21,975 22,054 21,778
13,270 13,310 13,172
18,201 18,289 17,983
11,096 11,140 10,987
17,434 17,519 17,223
10,713 10,755 10,607
22,722 22,836 22,436
13,625 13,682 13,482
21,715 21,826 21,438
13,121 13,177 12,983
18,045 18,129 17,834
11,000 11,042 10,894
22,605 22,715 22,328
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
13,970 14,026 13,832

28,013 28,177 27,604


84,455 84,775 83,656
55,268 55,268 55,268
22,114 22,114 22,114
34,694 34,694 34,694
80,681 80,681 80,681
63,236 63,236 63,236
36,891 36,891 36,891
84,545 84,545 84,545
100,902 100,902 100,902
148,162 148,162 148,162
58,729 58,729 58,729
81,713 81,713 81,713
74,334 74,334 74,334
131,467 131,467 131,467
76,717 76,717 76,717
56,413 56,413 56,413
32,356 32,356 32,356
60,830 61,034 60,321
47,021 47,021 47,021
43,121 43,121 43,121
36,541 36,541 36,541
35,764 35,764 35,764
36,032 36,032 36,032
50,576 50,576 50,576
44,499 44,499 44,499
81,247 81,247 81,247
149,780 149,780 149,780
67,424 67,424 67,424
42,667 42,667 42,667
33,368 33,368 33,368
57,920 57,920 57,920
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
20,077 20,077 20,077
24,099 24,099 24,099
26,071 26,071 26,071
33,496 33,496 33,496
22,179 22,179 22,179
52,180 52,180 52,180
354,371 354,371 354,371
409,841 409,841 409,841
270,234 270,234 270,234
288,463 288,463 288,463

481,399 487,968 464,978


422,817 428,895 407,622
422,447 428,734 406,730
377,954 384,345 361,976
356,352 362,932 339,904
328,824 335,613 311,853
279,783 285,400 265,743
489,077 494,531 475,444
441,138 446,407 427,962
500,163 505,091 487,840
724,923 729,851 712,600

123,075 123,075 123,075


4,270 4,310 4,168
137,913 137,913 137,913
168,681 168,681 168,681
244,386 244,386 244,386
271,959 271,959 271,959
299,563 299,563 299,563
198,825 198,825 198,825
225,367 225,367 225,367
331,534 331,534 331,534
125,835 125,835 125,835
166,975 166,975 166,975
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
185,554 185,554 185,554
472,207 472,207 472,207
42,118 42,118 42,118
26,343 26,343 26,343
99,590 99,590 99,590
120,869 120,869 120,869
93,929 93,929 93,929
29,220 29,220 29,220
29,220 29,220 29,220
27,707 27,707 27,707
42,415 42,415 42,415
52,468 52,468 52,468
63,191 63,191 63,191
75,924 75,924 75,924
356,881 356,881 356,881
249,652 249,652 249,652
33,703 33,703 33,703
43,085 43,085 43,085
52,468 52,468 52,468
65,872 65,872 65,872

76,074 76,074 76,074


210,859 210,859 210,859
80,660 80,660 80,660
144,762 144,762 144,762
136,622 136,622 136,622
89,707 89,707 89,707
211,196 211,196 211,196
110,141 110,141 110,141
6,616 6,616 6,616
99,907 99,907 99,907

120,872 120,872 120,872

41,121 41,121 41,121


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

537,349 537,349 537,349


193,504 193,504 193,504

217,620 217,620 217,620

490,236 490,236 490,236

128,785 128,785 128,785


391,734 391,734 391,734
6,040 6,040 6,040
275,805 275,805 275,805
122,506 122,506 122,506
86,191 86,191 86,191
89,045 89,045 89,045

10,607 10,607 10,607

11,757 11,757 11,757

9,369 9,369 9,369

221,655 221,655 221,655


266,941 266,941 266,941
22,114 22,114 22,114
34,694 34,694 34,694
33,332 33,332 33,332
42,688 42,688 42,688
87,884 87,884 87,884
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
223,008 223,008 223,008
44,282 44,282 44,282
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
35,163 35,163 35,163
67,031 67,031 67,031
100,119 100,119 100,119
84,344 84,344 84,344
61,733 61,733 61,733
65,618 65,618 65,618
82,905 82,905 82,905
66,686 66,686 66,686
83,266 83,266 83,266
89,013 89,013 89,013
73,586 73,586 73,586
12,489 12,489 12,489
17,549 17,549 17,549
22,921 22,921 22,921
14,179 14,179 14,179
8,485 8,485 8,485
50,971 50,971 50,971
32,634 32,634 32,634
10,616 10,616 10,616
25,239 25,239 25,239
34,991 34,991 34,991
47,467 47,467 47,467
88,548 88,548 88,548
107,700 107,700 107,700
60,068 60,068 60,068
76,418 76,418 76,418
184,406 184,406 184,406
379,972 379,972 379,972
280,860 280,860 280,860
17,616 17,616 17,616
22,225 22,225 22,225
172,837 172,837 172,837
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

281,056 281,056 281,056

467,502 467,502 467,502

40,428 40,428 40,428

47,659 47,659 47,659

61,272 61,272 61,272

69,362 69,362 69,362

89,362 89,362 89,362

103,709 103,709 103,709

153,471 153,471 153,471

61,915 61,915 61,915


62,166 62,166 62,166
40,001 40,001 40,001
49,238 49,238 49,238
4,165 4,165 4,165

6,557 6,557 6,557


1,013,971 1,013,971 1,013,971
775,359 775,359 775,359
2,598,608 2,598,608 2,598,608
2,166,952 2,166,952 2,166,952
631,026 631,026 631,026
815,757 815,757 815,757
313,250 313,250 313,250

363,108 363,108 363,108


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
57,691 57,691 57,691
68,255 68,255 68,255
75,833 75,833 75,833
89,263 89,263 89,263
54,261 54,261 54,261
61,833 61,833 61,833
142,980 142,980 142,980
55,700 55,700 55,700
127,950 127,950 127,950
76,565 76,565 76,565
45,395 45,395 45,395
95,792 95,792 95,792
409,127 409,127 409,127
544,712 544,712 544,712
3,526 3,526 3,526
4,658 4,658 4,658
7,243 7,243 7,243
12,958 12,958 12,958
272,148 272,148 272,148
76,978 76,978 76,978
104,075 104,075 104,075
42,696 42,696 42,696
1,397,059 1,397,059 1,397,059
1,035,471 1,035,471 1,035,471
1,290,877 1,290,877 1,290,877
599,968 599,968 599,968
109,824 109,824 109,824
503,291 503,291 503,291
629,532 629,532 629,532
1,661,945 1,661,945 1,661,945
1,224,005 1,224,005 1,224,005

40,782 40,972 40,309


40,411 40,601 39,937
14,974 15,012 14,879
29,997 30,376 29,049
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
86,905 87,284 85,957
27,381 27,512 27,052
60,533 61,172 58,935
84,428 85,451 81,872
30,447 30,447 30,447
23,113 23,113 23,113
27,155 27,155 27,155
49,479 50,054 48,041
58,080 58,783 56,322
84,422 85,508 81,705
127,382 132,378 114,893
123,629 126,572 111,696

57,864 57,939 57,674


34,603 34,641 34,508
66,660 66,849 66,186
69,960 70,149 69,486
74,261 74,450 73,787
76,047 76,123 75,857
38,069 38,154 37,857
166,314 166,655 165,461
47,959 48,167 47,440
44,257 44,257 44,257
10,750 10,835 10,538
9,415 9,415 9,415
12,629 12,629 12,629
10,609 10,609 10,609
17,715 17,715 17,715
34,436 34,436 34,436
9,339 9,339 9,339
74,900 74,900 74,900
120,777 121,043 120,114
7,651 7,651 7,651
32,913 32,994 32,709
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
46,117 46,117 46,117
53,556 53,556 53,556
49,580 49,580 49,580
50,268 50,344 50,079
56,337 56,413 56,147
11,067 11,067 11,067
50,773 50,895 50,468
20,729 20,729 20,729
123,901 123,901 123,901
10,065 10,065 10,065
22,648 22,648 22,648
14,576 14,576 14,576
14,165 14,165 14,165
8,659 8,659 8,659
8,809 8,809 8,809
19,207 19,207 19,207
17,515 17,515 17,515

18,712 18,712 18,712

21,632 21,632 21,632

65,977 66,053 65,787


77,730 77,730 77,730
34,614 34,614 34,614
13,374 13,374 13,374
101,969 101,969 101,969
123,539 123,539 123,539

73,049 73,049 73,049


36,354 36,354 36,354
55,861 55,861 55,861
68,456 68,456 68,456
51,130 51,130 51,130
94,636 94,636 94,636
49,008 49,008 49,008
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
104,520 104,520 104,520
13,600 13,600 13,600

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
43,707 43,707 43,707

49,987 49,987 49,987

85,005 85,005 85,005

19,114 19,114 19,114


82,323 77,183 75,469
132,283 137,454 119,357
154,567 166,560 164,847
81,120 75,979 74,266
142,600 154,593 152,880
151,536 163,530 161,816

303,066 303,066 303,066

891,968 891,968 891,968

483,606 483,606 483,606

140,834 140,834 140,834

196,765 196,765 196,765

182,791 182,791 182,791

401,459 401,459 401,459


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

1,025,661 1,025,661 1,025,661

291,841 291,841 291,841

207,056 207,056 207,056


82,823 82,823 82,823
250,435 250,435 250,435

368,546 368,546 368,546

8,396 8,396 8,396


3,107 3,107 3,107
11,210 11,210 11,210
42,463 42,463 42,463
5,875 5,875 5,875
65,805 65,805 65,805
3,498 3,498 3,498
2,790 2,790 2,790
14,025 14,025 14,025
4,059 4,059 4,059
14,786 14,786 14,786
5,765 5,765 5,765
6,564 6,564 6,564
7,072 7,072 7,072
4,431 4,431 4,431
15,617 15,617 15,617
9,687 9,687 9,687
22,931 22,931 22,931
2,704 2,704 2,704
12,221 12,221 12,221
3,299 3,299 3,299
12,670 12,670 12,670
7,128 7,128 7,128
4,484 4,484 4,484
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
21,901 21,901 21,901
12,767 12,767 12,767
7,893 7,893 7,893

6,069,901 6,069,901 6,069,901


10,724,588 10,724,588 10,724,588
2,806,719 2,806,719 2,806,719
9,172,351 9,172,351 9,172,351
8,589,236 8,589,236 8,589,236
2,704 2,704 2,704
861,798 861,798 861,798
86,054 86,054 86,054
1,559,217 1,559,283 1,559,053
684,376 685,948 680,447

29,453 29,453 29,453


43,734 43,734 43,734
54,211 54,211 54,211
17,692 17,692 17,692

21,424 21,424 21,424

29,202 29,202 29,202


26,194 26,194 26,194
27,613 27,613 27,613
34,517 34,517 34,517
17,677 17,677 17,677
23,164 23,164 23,164
35,615 35,615 35,615
272,884 272,884 272,884
314,040 314,040 314,040
327,561 327,561 327,561
303,971 303,971 303,971
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

221,894 221,894 221,894


33,986 33,986 33,986
103,669 103,669 103,669
263,881 263,881 263,881
52,164 52,164 52,164
574,015 574,015 574,015
1,421,949 1,421,949 1,421,949
45,129 45,129 45,129
221,867 221,867 221,867
44,156 44,156 44,156
3,770 3,770 3,770
6,323 6,323 6,323
18,737 18,737 18,737
24,542 24,542 24,542
31,848 31,848 31,848
122,938 122,938 122,938
32,079 32,079 32,079
104,825 104,825 104,825
184,512 184,512 184,512
289,353 289,353 289,353
359,711 359,711 359,711
392,888 392,888 392,888
576,229 576,229 576,229
339,694 339,694 339,694
104,213 104,213 104,213
13,866 13,866 13,866
28,332 28,332 28,332
5,018 5,018 5,018
35,393 35,393 35,393
36,974 36,974 36,974
37,765 37,765 37,765
24,636 24,636 24,636
27,238 27,238 27,238
28,330 28,330 28,330
47,541 47,541 47,541
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
614,491 614,491 614,491
315,883 315,883 315,883
88,938 88,938 88,938
1,843 1,843 1,843
8,506 8,506 8,506
12,669 12,669 12,669
21,132 21,132 21,132
3,922 3,922 3,922
22,479 22,479 22,479
32,663 32,663 32,663
19,450 19,450 19,450
15,422 15,422 15,422
619,545 619,545 619,545
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
URBANISMO

9,712 9,712 9,712


90,714 90,714 90,714
510,422 510,422 510,422
1,089,406 1,089,406 1,089,406
124,957 124,957 124,957
760,638 760,638 760,638
1,636,662 1,636,662 1,636,662
13,157 13,157 13,157
16,206 16,206 16,206
20,324 20,324 20,324
22,235 22,235 22,235
26,637 26,637 26,637
26,637 26,637 26,637
106,762 106,762 106,762
123,676 123,676 123,676
382,681 382,681 382,681
143,682 143,682 143,682
236,860 236,860 236,860
1,047,821 1,047,821 1,047,821
1,207,205 1,207,205 1,207,205
14,238 14,238 14,238
12,573 12,573 12,573
30,865 30,865 30,865
122,677 122,677 122,677
182,553 182,553 182,553
29,897 29,897 29,897
102,887 102,887 102,887
152,335 152,335 152,335
30,189 30,189 30,189
62,214 62,214 62,214
250,303 250,303 250,303
72,566 72,566 72,566
291,177 291,177 291,177
174,893 174,893 174,893
496,919 496,919 496,919
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
1,329,921 1,329,921 1,329,921
1,965,059 1,965,059 1,965,059

10,797 10,797 10,797


24,689 24,689 24,689
19,114 19,114 19,114
115,236 120,328 102,504
77,289 72,148 70,435
86,179 81,039 79,326
84,905 92,079 91,054
96,188 93,053 92,009
129,790 135,081 116,564

114,123 114,123 114,123


1,189,204 1,189,204 1,189,204
149,117 149,117 149,117
1,377,386 1,377,386 1,377,386
960,078 960,078 960,078
62,584 62,584 62,584
113,289 113,289 113,289
267,436 267,436 267,436
267,429 267,429 267,429
429,318 429,318 429,318
113,337 113,337 113,337
113,337 113,337 113,337
267,436 267,436 267,436
267,436 267,436 267,436
429,318 429,318 429,318
431,791 431,791 431,791
700,607 700,607 700,607
1,124,257 1,124,257 1,124,257
69,484 69,484 69,484
361,455 361,455 361,455
404,582 404,582 404,582
1,120,140 1,120,140 1,120,140
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
65,917 65,972 65,781
327,750 327,750 327,750
49,824 49,824 49,824
70,438 70,438 70,438
101,616 101,616 101,616
155,969 155,969 155,969
250,606 250,606 250,606
364,028 364,028 364,028
460,545 460,545 460,545
605,497 605,497 605,497
832,606 832,606 832,606

684,016 687,788 674,586

658,106 660,521 652,068

721,485 724,000 715,198

813,113 817,828 801,325

933,657 937,057 925,154

835,245 838,703 826,601


1,000,724 1,002,530 996,214
1,462,394 1,467,664 1,449,221
2,010,629 2,020,601 1,985,698
2,686,196 2,702,773 2,644,755
1,824,357 1,824,357 1,824,357
3,856,597 3,856,597 3,856,597
138,820 138,918 138,573

74,883 75,168 74,170


88,299 88,584 87,586
58,660 59,331 56,982
63,332 63,992 61,682
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
63,371 64,009 61,775
252,467 252,566 252,221
18,753 18,834 18,552
41,960 42,433 40,777
83,211 83,263 83,079
560,584 562,006 557,031
63,231 63,456 62,667
91,134 91,360 90,570
34,458 34,722 33,797

55,891 56,426 54,555


100,008 101,454 101,070
60,522 60,659 60,181

203,115 203,429 202,329


663,581 664,021 662,481
213,687 213,753 213,523
162,764 163,141 161,821
164,631 165,009 163,688
192,665 193,060 191,678
60,051 60,269 59,506
69,174 69,418 68,564
309,763 309,818 309,627
816,969 817,157 816,497
3,346,826 3,346,952 3,346,512
3,442,886 3,443,012 3,442,572
482,011 482,143 481,682
640,172 640,699 638,857
529,874 529,874 529,874
247,048 247,237 246,577
571,111 571,247 570,770
6,365,268 6,366,211 6,362,910

3,999 3,999 3,999


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
43,048 43,048 43,048
311,066 311,115 310,942
491,201 491,464 490,543
233,361 233,410 233,237
247,773 247,822 247,649
258,687 258,736 258,563
13,444 13,444 13,444
14,354 14,354 14,354
116,684 116,684 116,684
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón
PECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548

35,228 35,228 35,228

8,749 8,749 8,749

14,967 14,967 14,967


13,068 13,068 13,068
7,499 7,499 7,499
481 481 481

12,832 12,832 12,832

20,948 20,948 20,948

64,852 64,852 64,852

79,625 79,625 79,625

19,035 19,035 19,035


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

39,738 39,738 39,738

31,203 31,203 31,203

53,644 53,644 53,644

5,366 5,366 5,366


142,600 154,593 152,880
151,536 163,530 161,816
139,125 139,125 139,125
3,190 3,190 3,190
1,113 1,113 1,113
230,820 232,178 227,423
67,219 67,569 66,343
572,267 554,144 540,964

599,042 580,919 567,739

635,489 617,367 604,187

606,479 588,357 575,177


347,469 353,028 352,621
297,629 309,623 307,909
287,634 299,627 297,914
38,111 38,111 38,111
168,912 168,912 168,912
81,120 75,979 74,266
12,169 12,266 11,927
4,948 4,996 4,827
657,241 663,189 642,373

690,145 696,359 674,612


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

711,944 718,330 695,980

7,013 7,013 7,013


131,338 126,989 125,539

935,146 941,892 918,281


808,852 815,487 792,267
856,071 862,968 838,829
590,653 596,792 575,306
687,643 694,025 671,688
590,279 596,629 574,405
687,254 693,856 670,752
749,310 755,660 733,436
610,671 617,273 594,168
794,171 800,773 777,668

11,835 11,835 11,835

15,160 15,160 15,160


1,781 1,781 1,781
2,668,766 2,668,766 2,668,766

4,150,151 4,161,691 4,121,302

1,740,196 1,746,483 1,724,479


86,351 86,351 86,351
360,914 361,668 359,028
420,004 420,004 420,004
16,781 16,781 16,781
512,051 515,470 491,376
101,577 111,726 110,276
82,038 77,293 75,711
405,634 412,280 389,021
391,709 394,076 379,732
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

400,352 402,719 388,375


404,670 406,923 392,975
413,313 415,566 401,618
539,732 546,187 523,594
634,927 641,638 618,150
216,779 212,627 211,243
220,893 216,741 215,357
43,650 44,046 42,659

16,992 17,190 16,497

10,025 10,025 10,025

14,271 14,271 14,271

19,189 19,189 19,189

22,994 22,994 22,994

29,532 29,532 29,532

7,195 7,195 7,195

8,193 8,193 8,193

8,515 8,515 8,515

6,076 6,076 6,076

9,133 9,133 9,133

7,454 7,454 7,454

9,133 9,133 9,133


OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

17,514 17,514 17,514

624,001 624,086 623,790

363,313 364,728 359,777

872,444 872,444 872,444

149,838 144,895 143,248

4,382 4,382 4,382

84,904 84,904 84,904

129,340 129,340 129,340


549,264 555,975 532,487
232,643 228,492 227,108
67,204 67,204 67,204

3,999 3,999 3,999


43,048 43,048 43,048
82,823 82,823 82,823
68,915 68,915 68,915
148,128 148,447 147,330
13,444 13,444 13,444

835 835 835

131,984 131,984 131,984

25,566 25,566 25,566


8,310 8,310 8,310
OBERNACIÓN DE CUNDINAMARCA
OS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SABANA OCCIDENTE
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Subachoque Tenjo Zipacón

448,890 448,890 448,890

1,804 1,804 1,804


15,319 15,319 15,319
24,756 24,756 24,756
9,436 9,436 9,436

DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
i
CONSTRUCCIÓN p
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ###
o 1,893,673
1.2 CAMPAMENTO 9 M2 UN ### 1,109,777
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 13,730
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,387
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 17,817
1.6 CERCA EN TABLA H=2.30 M ML ### 62,384
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 43,695
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 20,283
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ###
i 9,803
p
1.37 DESMONTE MUROS SECOS M2 ### i 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 851,364
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 9,935
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,569
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,540,612
1.44 RED TELEFÓNICA PROVISIONAL UN ### 236,619
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 68,916
2.2 BASE ARENA CEMENTO 1:20 M3 ### 172,850
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 21,050
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 592,656
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 594,311
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 554,442
2.9 PILOTE DE MADERA D=20 CM ML ### 49,143
2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 151,470
2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 187,207
2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 230,425
2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 288,603
2.14 PILOTE HINCADO 25X25 ML ### 100,382
2.15 PILOTE HINCADO 30X30 ML ### 122,903
2.16 DADOS EN CONCRETO 3500PSI M3 ### 540,293
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 90,528

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 36,694
3.2 SIFÓN EN PVC 6" UN ### 187,017
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 410,638
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 212,275
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 239,762
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ###
i 312,329
p
3.7 DUCTO ELÉCTRICO PVC 4" ML ### i 102,653
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### o 1,208,560
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 109,817
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 68,882
3.11 TUBERÍA DRENAJE PVC 110 ML ### 26,591
3.12 TUBERÍA DRENAJE PVC 160 ML ### 42,624
3.13 TUBERÍA DRENAJE PVC 200 ML ### 55,790
3.14 TUBERÍA DRENAJE PVC 250 ML ### 76,175
3.15 TUBERÍA DRENAJE PVC 315 ML ### 105,211
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 901,774
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,270,733
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,649,699

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 40,233
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 52,919
4.3 COLUMNAS 3500 PSI M3 ### 754,859
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 209,289
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.5 PSI M2 ### 91,486
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.6 PSI M2 ### 107,670
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 121,365
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 127,997
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 146,058
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 162,200
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 179,925
4.12 ENTREPISO VIGUETA PLACA M2 ### 94,722
4.13 ESCALERA MACIZA 3500 PSI M3 ### 895,422
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 90,228
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 74,102
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 82,995
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 96,344
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 658,171
4.19 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 47,497
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 260,961
4.21 ACERO FIGURADO 37000 PSI KG ### 3,972
4.22 ACERO FIGURADO 60000 PSI KG ### 4,166
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
4.23 REFUERZO MALLA ELECTROSOLDADA KG ###
i 5,937
p
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### i 803,669
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### o 726,017
4.26 VIGA AÉREA 3500 PSI M3 ### 796,882
4.27 VIGA CINTA 3500 PSI M3 ### 776,775
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 986,688
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 280,773

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 28,525
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 48,832
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 34,110
5.4 ARCOS EN LADRILLO PRENSADO ML ### 159,822
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 42,328
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,105
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 94,228
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 84,884
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 88,098
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 51,973
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 84,922
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 50,384
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 97,938
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 58,214
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 108,718
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 63,604
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 39,110
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 23,869
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 50,706
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 30,732
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 57,082
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 34,594
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 94,532
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 56,345
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 35,947
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 21,955
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 71,221
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 43,272
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ###
i 83,818
p
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### i 51,248
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### o 172,924
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 104,856
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 85,746
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 52,212
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 44,890
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 27,544
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 32,603
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,007
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 48,809
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 30,185
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 94,050
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 57,773
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 68,766
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 41,832
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 143,923
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 88,307
5.47 REMATES LADRILLO PRENSADO ML ### 30,650
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 34,985
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 59,185
5.50 LAVADA DE FACHADA M2 ### 5,213
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 49,186
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,538
5.53 ANCLAJE 3/8" L=30CM UN ### 13,769
5.54 ANCLAJE 1/2" L=50CM UN ### 17,948
5.55 ANCLAJE 5/8" L=70CM UN ### 24,868
5.56 ANCLAJE 3/4" L=70CM UN ### 36,736
5.57 ANCLAJE 1" L= 70CM UN ### 4,606

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 15,958
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,575
6.3 FILOS O DILATACIONES S/MURO ML ### 6,761
6.4 GOTERA EN MORTERO 1:4 ML ### 7,982
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,571
6.6 MALLA BAJO ENTRAMADO M2 ### 13,444
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ###
i 23,773
p
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### i 14,481
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### o 20,444
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,506
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 19,882
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,225
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 20,444
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,506
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 20,940
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 12,753
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,059
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,525
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,631
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,311
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 21,222
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 12,875
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 20,660
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,594
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,241
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,598
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 21,550
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,443

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 25,870
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### 78,290
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 52,685
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 21,315
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 33,355
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 76,712
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 60,269
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 35,439
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 80,353
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 95,769
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 140,309
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 56,115
7.13 CANAL PVC AMAZONAS ML ### 78,353
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
7.14 CANAL PVC RAINGO ML ###
i 71,397
p
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### i 125,097
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### o 72,841
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 53,705
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 31,354
7.19 TEJA DE BARRO M2 ### 57,048
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 44,744
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 41,069
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 35,206
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 34,423
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 34,675
7.25 TEJA TERMOACÚSTICA M2 ### 48,337
7.26 TEJA PLÁSTICA No.6 M2 ### 42,610
7.27 TEJA ESPAÑOLA ETERNIT M2 ### 77,339
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 141,997
7.29 TEJA SIN TRASLAPO M2 ### 64,139
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 41,553
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 32,342
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 55,481
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 19,601
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 23,391
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 25,202
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 32,198
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 21,489
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 50,468
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 334,686
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 399,530
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 257,692
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 274,376

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 404,572
8.2 CONCRETO 3500 PSI M3 ### 352,689
8.3 CONCRETO 3000 PSI M3 ### 350,859
8.4 CONCRETO 2500 PSI M3 ### 308,518
8.5 CONCRETO 2000 PSI M3 ### 286,006
8.6 CONCRETO 1500 PSI M3 ### 257,484
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
8.7 MORTERO SECO 1:10 M3 ###
i 215,815
p
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### i 417,660
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### o 390,914
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 448,456
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 660,276

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 117,838
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,747
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 132,558
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 161,555
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 231,868
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 257,891
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 283,947
9.8 HOJA PUERTA FORTEC 0.81 UN ### 188,136
9.9 HOJA PUERTA FORTEC 0.91 UN ### 213,151
9.10 HOJA PUERTA FORTEC 1.50 UN ### 313,210
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 119,345
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 158,118
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 175,628
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 445,788
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 40,503
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 25,635
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 95,818
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 114,306
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 88,916
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 27,930
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 27,930
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 26,504
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 40,680
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 50,154
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 60,260
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 72,261
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 337,602
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 236,542
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 32,469
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 41,311
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
9.31 VIDRIO TRANSPARENTE 5 MM M2 ###
i 50,154
p
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### i 62,787
o
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 72,986
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 200,017
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 77,736
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 140,732
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 131,341
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 86,264
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 202,438
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 105,953
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,387
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 97,382
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 115,594
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 40,046
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 508,777
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 183,982
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 208,322
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 465,040
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 125,060
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 370,485
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 5,822
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 261,779
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 118,682
10.21 REJILLA PISO 0.30 M M2 ### 82,590
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 85,533
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,319
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,
10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,403
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,
10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,151
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
11.1 ACOMETIDA EN PVC 1/2" 5M UN ###
i 215,105
p
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### i 257,791
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### o 21,315
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 33,355
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 32,190
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 41,088
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 84,207
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 216,380
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,216
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924
11.12 LLAVE MANGUERA UN ### 34,174
11.13 NIPLE PASAMURO 2" UN ### 65,656
11.14 NIPLE PASAMURO 4" UN ### 97,904
11.15 PUNTO AGUA CALIENTE CPVC UN ### 81,975
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 60,661
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 64,324
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 81,238
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 64,921
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 80,545
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 85,960
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 70,482
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,019
11.24 RED SUMINISTRO CPVC 3/4" ML ### 16,788
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 21,946
11.26 RED SUMINISTRO PVC 1" ML ### 13,639
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,203
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 48,555
11.29 RED SUMINISTRO PVC 2" ML ### 31,170
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,235
11.31 RED SANITARIA PVC-S 2" ML ### 24,202
11.32 RED SANITARIA PVC-S 3" ML ### 33,474
11.33 RED SANITARIA PVC-S 4" ML ### 45,357
11.34 RED SANITARIA PVC-S 6" ML ### 84,074
11.35 REGISTRO 1" UN ### 102,745
11.36 REGISTRO 1/2" UN ### 57,388
11.37 REGISTRO 3/4" UN ### 72,797
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
11.38 REGISTRO 1 1/2" UN ###
i 175,038
p
11.39 REGISTRO 2 1/2" UN ### i 359,662
11.40 REGISTRO 2" UN ### o 266,252
11.41 REVENTILACIÓN 2" ML ### 16,947
11.42 REVENTILACIÓN 3" ML ### 21,360
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 165,995
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 269,023
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 446,810
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 38,636
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 45,507
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 58,893
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 66,291
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 85,336
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 99,779
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 147,941
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 59,929
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 60,165
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 38,435
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 47,140
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 3,967
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,222
11.59 GABINETE TIPO III UN ### 965,256
11.60 GABINETE TIPO I UN ### 740,373
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,457,010
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,050,189
11.63 VÁLVULA MARIPOSA 3" UN ### 602,683
11.64 VÁLVULA MARIPOSA 4" UN ### 776,786
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 295,891

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 346,043
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 54,968
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 64,923
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 72,263
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 84,919
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 51,768
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 58,937
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
12.8 STRIP TELEFÓNICO 10 PARES UN ###
i 136,990
p
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### i 53,092
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### o 121,800
12.11 SALIDA T.V PVC COMPLETA. UN ### 72,998
12.12 SALIDA BIFÁSICA C.N. UN ### 43,269
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 91,625
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 391,652
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 520,763
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,369
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,454
12.18 TUBERÍA PVC CONDUIT 1" ML ### 6,914
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 12,379
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 259,641
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 73,672
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 99,210
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 41,363
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,338,603
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 992,522
12.26 POSTE METÁLICO 6M UN ### 1,225,519
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 567,518
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 104,746
12.29 LUMINARIA 70W SODIO UN ### 475,814
12.30 LUMINARIA 150W SODIO UN ### 594,792
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,567,877
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,155,133

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 38,281
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 37,601
13.3 ALISTADO PARA LISTÓN M2 ### 14,434
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 26,636
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 80,534
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 25,883
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 53,463
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 73,123
13.9 MANTO FIBERGLASS 600X1 M2 ### 29,184
13.10 PEGANTE MORTERO-CONCRETO M2 ### 22,454
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
13.11 PERMA PLY 2 CAPAS M2 ###
i 26,478
p
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### i 43,167
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### o 50,379
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 72,491
13.15 TRITURADO FINO 1/2 M3 ### 76,980
13.16 TRITURADO GRUESO 3/4 M3 ### 82,890

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 55,241
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 33,290
14.3 ADOQUÍN CONCRETO 6CM M2 ### 63,088
14.4 ADOQUÍN CONCRETO 8CM M2 ### 66,188
14.5 ADOQUÍN GRES PEATONAL M2 ### 70,316
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 72,311
14.7 GRAVILLA PARA GRADAS ML ### 37,066
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 156,803
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 45,599
14.10 GUARDAESCOBA EN GRANITO ML ### 43,323
14.11 GUARDAESCOBA EN GRAVILLA ML ### 9,854
14.12 GUARDAESCOBA PVC CARAMELO ML ### 8,946
14.13 GUARDAESCOBA PVC CEDRO ML ### 11,977
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,267
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 16,965
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 32,725
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,232
14.18 LISTÓN M.H. AMARILLO M2 ### 72,202
14.19 PASO ESCALERA GRANITO ML ### 115,293
14.20 PIRLANES ALUMINIO ML ### 7,613
14.21 PIRLANES LADRILLO ML ### 31,428
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 44,055
14.23 PISO VINILO TRÁFICO PESADO M2 ### 51,036
14.24 PULIDA LACADA PISO MADERA M2 ### 48,026
14.25 TABLETA DE GRES 25X25 M2 ### 48,015
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 53,736
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 10,860
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 47,838
14.29 JABONERA PORCELANA ACUARIO UN ### 19,844
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ###
i 118,115
p
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### i 9,888
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### o 21,748
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,141
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 13,753
14.35 REMATES BOCEL ALUMINIO ML ### 8,544
14.36 REMATES BOCEL PORCELANA ML ### 8,686
14.37 TAPA REGISTRO 20X20 UN ### 18,505
14.38 TAPA REGISTRO 6X6 UN ### 16,911
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 17,635
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 20,387
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 62,642
14.42 MEDIA CAÑA EN GRANITO ML ### 73,687
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,413
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 12,917
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 96,239
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 116,974

15 CIELO RASO
15.1 APLIQUE YESO ML ### 69,307
15.2 ARMADURA MADERA Y MALLA M2 ### 35,740
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 53,961
15.4 CIELO RASO DURACUSTIC M2 ### 65,831
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 49,288
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 90,664
15.7 CORNISAS YESO ML ### 46,419
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,850
15.9 MALLA CON VENA M2 ### 13,354

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16.2 MENOR DE 5 KM) M3 ### 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ###
i 85,005
p
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### i 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### o 55,331
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 65,606
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 141,665
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 58,822
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 121,996
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 138,635

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 288,111
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 843,407
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 458,264
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 135,489
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 187,926
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 174,756
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 380,843
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 969,408
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 277,532
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 197,901
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 80,540
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA) UN ### 238,509
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE
17.13 ACCESORIOS Y GRIFERÍA) UN ### 349,825

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,181
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,008
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,023
18.4 BARNIZ SOBRE MUEBLES M2 ### 41,145
18.5 CARBURO SOBRE PAÑETES M2 ### 5,770
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 62,328
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,451
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,709
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 13,693
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 3,949
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
18.11 ESMALTE SOBRE MADERA LLENA M2 ###
i 14,430
p
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### i 5,536
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### o 6,324
18.14 ESTUCO M2 ### 6,974
18.15 ESTUCO (LINEAL) ML ### 4,382
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,274
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,516
18.18 LACA PISOS MADERA M2 ### 22,597
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,652
18.20 MARMOLINA SOBRE PAÑETE M2 ### 11,765
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,182
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,353
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 6,965
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,403
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,136
18.26 PINTURA EPÓXICA M2 ### 12,527
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,773

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 5,724,476
19.2 CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,114,338
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,647,293
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 8,650,680
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,099,265
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,652
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 814,333
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 81,103
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,470,447
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 639,735

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 28,419
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 41,945
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 51,908
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 17,132
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 20,684
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 28,111
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ###
i 25,594
p
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### i 26,964
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### o 33,620
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 16,856
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 22,045
20.12 VÁLVULA DE BOLA GAS 1" UN ### 33,801
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 258,085
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 296,873
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 309,845
20.16 ACOMETIDA GAS 1/2" ML ### 288,180

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 210,301
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 32,078
21.3 SIRENA DE 110 V UN ### 98,682
21.4 CÁMARA CCTV UN ### 254,565
21.5 PARLANTE-CIELO FALSO UN ### 50,141
21.6 AMPLIFICADOR 100W UN ### 545,878
21.7 AMPLIFICADOR 300W UN ### 1,344,832
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 44,790
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 209,836
21.10 TOMA PARA MICRÓFONO UN ### 42,736
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,602
21.12 SPLITERS UN ### 5,988
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,392
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,027
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 31,103
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 116,730
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 30,478
21.18 BANDEJA PORTACABLES PARA RACK UN ### 99,213
21.19 RACK 2' X 24" UN ### 178,786
21.20 RACK 3' X 24" UN ### 277,594
21.21 RACK 5' X 24" UN ### 346,349
21.22 RACK 7' X 24" UN ### 377,617
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 557,743
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 329,929
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 98,990
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
21.26 PATCH CORD 2M CATEGORÍA 6A UN ###
i 13,110
p
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### i 26,743
21.28 CABLE UTP CATEGORÍA 6A ML ### o 4,827
21.29 CANALETA METÁLICA 4X6 CMS ML ### 34,234
21.30 CANALETA METÁLICA 4X10 CMS ML ### 35,724
21.31 CANALETA METÁLICA 6X10 CMS ML ### 36,469
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 23,805
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 26,257
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 27,287
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 45,392
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 584,026
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 301,376
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 86,266
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,779
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,192
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,123
21.42 CABLE TELEFÓNICO 40 PARES ML ### 20,161
21.43 CABLE TELEVISIÓN RG6 ML ### 3,769
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,164
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,007
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 18,918
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 14,828
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 585,996
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
i
URBANISMO p
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ###
o 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 85,882
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 481,831
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,028,280
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 118,155
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 717,650
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,543,272
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 12,710
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 15,583
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 19,464
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 21,265
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 25,414
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 25,414
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 100,852
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 116,871
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 361,439
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 135,648
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 223,620
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 988,311
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,138,525
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 13,652
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,082
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 29,120
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 116,394
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 172,825
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 28,487
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 97,743
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 144,346
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 28,684
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 59,023
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 236,678
1.32 UNIÓN REPARACION PVC 4" UN ### 68,778
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 275,200
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 166,227
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 469,708
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ###
i 1,253,839
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### i 1,852,497
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,578
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,249
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 64,125
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 50,297
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 63,882
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 67,650
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 51,648
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 76,280

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 107,789
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,121,094
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 140,771
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,298,449
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 905,229
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 61,849
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 107,003
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 252,358
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 252,353
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 405,004
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 107,048
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 107,048
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 252,358
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 252,358
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 405,004
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 409,289
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 662,639
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,062,805
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 65,730
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 343,000
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 382,082
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,058,725
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
i 61,936
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### i 311,234
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 47,184
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 66,615
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 96,003
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 147,306
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 236,497
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 344,598
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 435,640
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 572,634
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 786,675

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 626,827
4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 617,106
4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 670,333
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 741,946
4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 872,319
4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 770,870
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 963,793
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,382,874
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,857,356
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,461,567
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,732,826
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,652,923
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y
4.13 DEMOLICIÓN) UN ### 134,381

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 69,245
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 81,881
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 51,174
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 55,619
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 55,811
5.6 BORDE SEPARADOR VERDE A-170 ML ### 238,155
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 17,789
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 36,732
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ###
i 79,250
p
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### i 530,463
5.11 LOSETA PREFABRICADA A-40 M2 ### o 59,457
5.12 LOSETA PREFABRICADA A-60 M2 ### 85,448
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 31,239
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 49,594
5.15 SARDINEL PREFABRICADO A-10 ML ### 93,871
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 57,278

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 190,855
6.2 BANCA EN CONCRETO M-30 UN ### 624,914
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 203,044
6.4 BOLARDO M-60 CONCRETO UN ### 152,711
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 154,579
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 180,739
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 56,209
6.8 BORDILLO PREFABRICADO A-80 ML ### 63,664
6.9 CANECA M-120 UN ### 292,663
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 772,308
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,158,015
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,248,549
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 454,476
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 600,889
6.15 BANCA EN MADERA M-50 UN ### 501,269
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 234,271
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 538,325
6.18 POSTE HISTÓRICO M-131 UN ### 6,000,247

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,776
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 41,134
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 294,490
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 464,473
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 223,017
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 236,601
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 246,887
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
7.8 TACHAS REFLECTIVAS UN ###
i 12,794
p
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### i 13,650
o
7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 110,404
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIASp 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM) M3 ### 152,777
1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673
1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.4 200.2 DISTANCIA DE 5KM)
HA ### 933,801
1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y
1.6 *** DERRUMBES M3-KM### 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,548
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 34,556
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832
2.9 600.1 EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.10 600.2 KM) M3 ### 64,007

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2.11 600.3 5 KM) M3 ### 78,781
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 600.4 MENOR DE 5 KM)
M3 ### 19,035
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 600.4 P DISTANCIA MENOR DE 5 KM) M3 ### 39,738
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.14 600.5 DISTANCIA MENOR DE 5 KM) M3 ### 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.15 600.5 P DISTANCIA MENOR DE 5 KM) M3 ### 53,644

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
3.2 320.1 SUBBASE GRANULAR M3 ###
i 121,996
p
3.3 330.1 BASE GRANULAR M3 ### i 138,635
3.4 365.1 EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE M3 ###
o 139,125
MENOR A 5 Km)
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,034
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,335
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 210,321
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 61,997
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 531,719
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 561,469
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 603,819
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 591,219
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 374,862
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 275,867
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 258,481
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 36,380
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 159,998
3.15 311.1 AFIRMADO M3 ### 58,822
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,817
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,160
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.18 500.1 UNIÓN M3 ### 584,433
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.19 500.1 UNIÓN M3 ### 613,351
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.20 500.1 UNIÓN
M3 ### 632,608
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN
3.21 *** DE FONDO Y SELLANTE) ML ### 6,847
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 79,348

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 854,952
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 730,934
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 775,402
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 519,501
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 613,686
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 517,653
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 611,764
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ###
i 676,684
p
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### i 535,504
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### o 719,004
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 11,558
4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG ### 14,706
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,730
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4.14 621.1 REFUERZO Y ANILLOS) ML ### 2,569,362
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN
4.15 621.1 P CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS) ML ### 3,976,683
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,659,371
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 82,279
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 343,908
4.19 632 P BARANDA METÁLICA ML ### 405,909
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,041
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 426,798
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 81,374
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 57,059
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 334,584
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 330,596
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 339,239
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 344,103
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 352,746
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 469,601
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 562,019
4.31 681.1 GAVIÓN M3 ### 164,097
4.32 681.1 GAVIÓN MALLA PVC M3 ### 167,974
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 39,255
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 14,749
4.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 ### 9,585
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 13,588
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 18,224
4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 ### 21,809
4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 ### 27,972
4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,879
4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,821
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
i
4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### p 8,123
i
4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### o 5,825

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,706

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,124

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,706

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 16,605
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE
4.48 661.1 EMBOQUILLADA ML ### 591,769
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 332,848
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 826,513
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 128,308
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,166
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 80,330
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 122,313
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 474,462
4.56 682.1 P COLCHONETA RENO M3 ### 179,724
4.57 *** TRINCHO EN MADERA M2 ### 63,673

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,776
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 41,134
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 78,379
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 65,271
5.5 730.1 DEFENSA METÁLICA ML ### 138,364
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 12,794

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 823
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE
6.2 801.6 DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM UN ### 131,984
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A
6.3 801.7 UNA DISTANCIA DE 5 KM ML ### 25,566
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,310
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ###
i 448,890
p
6.6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### i 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### o 14,638
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 23,534
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,143

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN
DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
CONSTRUCCIÓN

1,888,293
1,107,087
13,730
15,387
17,817
62,384
43,636
20,225
80,242
6,261
8,882
6,813
7,419
8,964
9,084
13,497
18,477
27,441
39,898
49,367
40,806
57,319
67,872
83,193
9,103
14,736
22,422
36,746
233,157
1,539
5,807
20,960
11,490
11,307
10,480
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
9,803
15,459
13,512
11,490
851,250
9,935
3,569
2,540,612
236,619
9,189

68,916
167,486
297,878
207,425
21,050
586,907
588,346
548,857
49,143
151,470
187,207
230,425
288,603
99,975
122,313
534,707
90,528

36,661
186,984
412,581
212,009
239,261
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
311,111
102,700
1,209,032
109,449
68,688
26,479
42,512
55,634
75,996
105,054
899,984
1,267,152
1,642,536

40,233
52,919
749,273
206,448
90,944
107,019
120,497
127,075
144,919
160,898
178,461
94,626
889,836
90,148
73,544
82,311
95,487
652,586
47,324
258,467
3,972
4,166
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
5,937
798,083
719,904
791,297
771,189
981,102
274,615

28,377
48,684
34,076
159,755
42,156
26,025
94,095
84,310
88,098
51,973
84,922
50,384
97,938
58,214
108,718
63,604
39,043
23,835
50,661
30,710
57,038
34,572
94,309
56,234
35,903
21,932
71,132
43,227
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
83,738
51,208
172,612
104,700
85,580
52,128
44,790
27,494
32,558
19,985
48,720
30,141
93,916
57,706
68,676
41,788
143,610
88,151
30,617
34,865
59,025
5,213
49,037
10,538
13,769
17,948
24,868
36,736
4,565

15,958
5,542
6,728
7,949
6,571
13,444
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
23,657
14,422
20,350
12,459
19,766
12,167
20,350
12,459
20,857
12,711
16,987
10,489
16,542
10,266
21,128
12,828
20,544
12,536
17,152
10,554
21,433
13,385

25,737
78,003
52,685
21,315
33,355
76,712
60,269
35,439
80,353
95,769
140,309
56,115
78,353
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
71,397
125,097
72,841
53,705
31,354
56,882
44,744
41,069
35,206
34,423
34,675
48,337
42,610
77,339
141,997
64,139
41,553
32,342
55,481
19,601
23,391
25,202
32,198
21,489
50,468
334,686
399,530
257,692
274,376

398,669
347,266
345,278
302,774
280,145
251,506
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
211,216
413,196
385,357
443,259
655,079

117,838
3,714
132,558
161,555
231,868
257,891
283,947
188,136
213,151
313,210
119,345
158,118
175,628
445,788
40,503
25,635
95,818
114,306
88,916
27,930
27,930
26,504
40,680
50,154
60,260
72,261
337,602
236,542
32,469
41,311
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
50,154
62,787

72,986
200,017
77,736
140,732
131,341
86,264
202,438
105,953
6,387
97,382
115,594
40,046
508,777
183,982
208,322
465,040
125,060
370,485
5,822
261,779
118,682
82,590
85,533

10,319

11,403

9,151
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
215,105
257,791
21,315
33,355
32,190
41,088
84,207
216,380
44,216
616,334
1,268,924
34,174
65,656
97,904
81,975
60,661
64,324
81,238
64,921
80,545
85,960
70,482
12,019
16,788
21,946
13,639
8,203
48,555
31,170
10,235
24,202
33,474
45,357
84,074
102,745
57,388
72,797
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
175,038
359,662
266,252
16,947
21,360
165,995
269,023
446,810
38,636
45,507
58,893
66,291
85,336
99,779
147,941
59,929
60,165
38,435
47,140
3,967
6,222
965,256
740,373
2,457,010
2,050,189
602,683
776,786
295,891

346,043
54,968
64,923
72,263
84,919
51,768
58,937
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
136,990
53,092
121,800
72,998
43,269
91,625
391,652
520,763
3,369
4,454
6,914
12,379
259,641
73,672
99,210
41,363
1,338,603
992,522
1,225,519
567,518
104,746
475,814
594,792
1,567,877
1,155,133

38,081
37,401
14,394
26,236
80,135
25,766
52,889
72,203
29,184
22,454
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
26,478
42,650
49,747
71,515
72,882
80,839

55,161
33,250
62,888
65,988
70,116
72,231
36,997
156,444
45,421
43,323
9,785
8,946
11,977
10,267
16,965
32,725
9,232
72,202
115,013
7,613
31,362
44,055
51,036
48,026
47,935
53,656
10,860
47,739
19,844
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
118,115
9,888
21,748
14,141
13,753
8,544
8,686
18,505
16,911
17,635
20,387
62,562
73,687
34,413
12,917
96,239
116,974

69,307
35,740
53,961
65,831
49,288
90,664
46,419
99,850
13,354

5,627
18,479
25,905
43,707

49,987
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
85,005
19,114
61,471
62,438
149,094
58,822
136,211
146,063

288,111
843,407
458,264
135,489
187,926
174,756
380,843
969,408
277,532
197,901
80,540
238,509

349,825

8,181
3,008
11,023
41,145
5,770
62,328
3,451
2,709
13,693
3,949
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
14,430
5,536
6,324
6,974
4,382
15,274
9,516
22,597
2,652
11,765
3,182
12,353
6,965
4,403
21,136
12,527
7,773

5,724,476
10,114,338
2,647,293
8,650,680
8,099,265
2,652
814,333
81,103
1,470,388
638,339

28,419
41,945
51,908
17,132
20,684
28,111
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
25,594
26,964
33,620
16,856
22,045
33,801
258,085
296,873
309,845
288,180

210,301
32,078
98,682
254,565
50,141
545,878
1,344,832
44,790
209,836
42,736
3,602
5,988
18,392
24,027
31,103
116,730
30,478
99,213
178,786
277,594
346,349
377,617
557,743
329,929
98,990
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
13,110
26,743
4,827
34,234
35,724
36,469
23,805
26,257
27,287
45,392
584,026
301,376
86,266
1,779
8,192
12,123
20,161
3,769
22,164
32,007
18,918
14,828
585,996
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
URBANISMO

9,712
85,882
481,831
1,028,280
118,155
717,650
1,543,272
12,710
15,583
19,464
21,265
25,414
25,414
100,852
116,871
361,439
135,648
223,620
988,311
1,138,525
13,652
12,082
29,120
116,394
172,825
28,487
97,743
144,346
28,684
59,023
236,678
68,778
275,200
166,227
469,708
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
1,253,839
1,852,497

10,578
24,249
19,114
59,927
56,437
63,882
56,377
51,648
71,948

107,789
1,121,094
140,771
1,298,449
905,229
61,849
107,003
252,358
252,353
405,004
107,048
107,048
252,358
252,358
405,004
409,289
662,639
1,062,805
65,730
343,000
382,082
1,058,725
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
61,892
311,234
47,184
66,615
96,003
147,306
236,497
344,598
435,640
572,634
786,675

623,478
614,560
668,100
737,760
868,733
767,801
962,145
1,378,112
1,848,459
2,446,778
1,732,826
3,652,923
134,277

69,012
81,648
50,570
55,033
55,242
238,051
17,716
36,307
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
79,194
529,075
59,219
85,210
31,004
49,120
95,088
57,134

190,576
624,523
202,986
152,376
154,244
180,388
56,030
63,464
292,619
772,140
3,157,903
3,248,437
454,359
600,420
501,269
234,104
538,214
5,999,410

3,776
41,134
294,438
464,239
222,965
236,549
246,835
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
12,794
13,650
110,404
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
SPECIFICACIONES TÉCNICAS INVIAS 2007)

152,777
53,673
2,613,971
933,801
89,524
1,318

9,548
34,556
8,749
14,967
13,068
7,499
481
12,832
20,948
64,007

78,781

19,035

39,738

31,203

53,644

5,366
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
136,211
146,063
139,125
3,034
1,335
209,182
61,638
523,482
553,232
595,581
582,982
360,883
283,295
272,697
36,380
159,998
58,822
12,737
5,120
579,089

607,767
626,864
6,847
79,348

848,890
724,972
769,204
514,024
607,992
512,016
605,904
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
671,047
529,644
713,144
11,558
14,706
1,730
2,569,362

3,966,313
1,653,790
82,279
343,239
405,909
16,041
420,882
65,426
62,727
328,665
327,079
335,722
340,657
349,300
463,800
555,988
164,097
167,974
38,899
14,571
9,585
13,588
18,224
21,809
27,972
6,879
7,821
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha

8,123

5,825

8,706

7,124

8,706

16,605

591,688
331,572
826,513
128,308
4,166
80,330
122,313
468,431
179,724
63,673

3,776
41,134
78,379
65,271
138,085
12,794

823
131,984

25,566
8,310
NTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Soacha
448,890
1,804
14,638
23,534
9,143
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p CONSTRUCCIÓN
i
1 PRELIMINARES o
1.1 CAMPAMENTO 18 M2 UN ### 2,036,014 2,091,780 2,025,252 2,050,689 2,060,473 2,031,122 2,045,798
1.2 CAMPAMENTO 9 M2 UN ### 1,185,735 1,213,618 1,180,354 1,193,072 1,197,964 1,183,289 1,190,626
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,264 14,264 14,264 14,264 14,264 14,264 14,264
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,991 15,991 15,991 15,991 15,991 15,991 15,991
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,488 18,488 18,488 18,488 18,488 18,488 18,488
1.6 CERCA EN TABLA H=2.30 M ML ### 66,638 66,638 66,638 66,638 66,638 66,638 66,638
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,911 47,521 46,794 47,072 47,179 46,858 47,018
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,773 22,383 21,655 21,934 22,041 21,720 21,880
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### p 10,480 10,480 10,480 10,480 10,480 10,480 10,480
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
1.37 DESMONTE MUROS SECOS M2 ###
o 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2 ### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 917,488 926,571 916,809 921,580 921,555 918,346 920,946
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,554 10,554 10,554 10,554 10,554 10,554 10,554
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,811 3,811 3,811 3,811 3,811 3,811 3,811
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,729,348 2,729,348 2,729,348 2,729,348 2,729,348 2,729,348 2,729,348
1.44 RED TELEFÓNICA PROVISIONAL UN ### 252,189 252,189 252,189 252,189 252,189 252,189 252,189
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,189 9,189 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 74,893 126,295 83,460 117,728 98,881 98,881 116,015
2.2 BASE ARENA CEMENTO 1:20 M3 ### 231,585 295,492 219,252 248,403 259,615 225,979 242,797
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,480 22,480 22,480 22,480 22,480 22,480 22,480
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 657,259 717,002 645,730 672,981 683,462 652,020 667,741
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 659,832 721,926 647,850 676,172 687,067 654,386 670,726
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 614,374 672,516 603,154 629,674 639,876 609,274 624,575
2.9 PILOTE DE MADERA D=20 CM ML ### 49,857 49,857 49,857 49,857 49,857 49,857 49,857
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM)
ML ### 153,787 153,787 153,787 153,787 153,787 153,787 153,787
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2.11 UNA DISTANCIA MENOR DE 5 KM) ML ### 192,371 192,371 192,371 192,371 192,371 192,371 192,371
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2.12 UNA DISTANCIA MENOR DE 5 KM) ML ### 239,031 239,031 239,031 239,031 239,031 239,031 239,031
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2.13 UNA DISTANCIA MENOR DE 5 KM)
ML ### 301,842 301,842 301,842 301,842 301,842 301,842 301,842
2.14 PILOTE HINCADO 25X25 ML ### 106,435 110,685 105,615 107,554 108,299 106,063 107,181
2.15 PILOTE HINCADO 30X30 ML ### 131,675 137,834 130,487 133,296 134,377 131,135 132,756
2.16 DADOS EN CONCRETO 3500PSI M3 ### 600,225 658,367 589,005 615,525 625,726 595,125 610,426
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 92,053 92,053 92,053 92,053 92,053 92,053 92,053
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS p
3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### i 39,040 39,437 38,964 39,145 39,214 39,005 39,110
3.2 SIFÓN EN PVC 6" UN ###
o 201,615 202,012 201,539 201,720 201,789 201,581 201,685
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 454,011 498,947 454,250 479,963 474,415 463,805 477,368
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 227,608 236,372 226,669 231,106 231,511 227,998 230,451
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 258,832 272,866 257,304 264,397 265,079 259,421 263,345
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 340,543 362,059 337,572 348,077 350,072 340,476 346,369
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 105,166 105,465 105,216 105,415 105,305 105,305 105,405
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,304,747 1,307,732 1,305,244 1,307,234 1,306,140 1,306,140 1,307,135
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 119,033 123,419 118,187 120,187 120,957 118,648 119,803
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 75,021 77,335 74,574 75,630 76,036 74,818 75,427
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,400 29,417 28,203 28,668 28,846 28,311 28,578
3.12 TUBERÍA DRENAJE PVC 160 ML ### 45,707 46,725 45,511 45,975 46,154 45,618 45,886
3.13 TUBERÍA DRENAJE PVC 200 ML ### 60,021 61,445 59,746 60,396 60,646 59,896 60,271
3.14 TUBERÍA DRENAJE PVC 250 ML ### 82,140 83,768 81,826 82,569 82,854 81,998 82,426
3.15 TUBERÍA DRENAJE PVC 315 ML ### 113,576 115,001 113,301 113,951 114,201 113,451 113,826
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 975,979 992,258 972,838 980,263 983,119 974,551 978,835

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3.17 FILTRANTE) UN ### 1,381,780 1,414,338 1,375,497 1,390,348 1,396,060 1,378,924 1,387,492

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL


3.18 FILTRANTE)
UN ### 1,803,910 1,869,027 1,791,344 1,821,046 1,832,470 1,798,198 1,815,334

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 42,861 42,861 42,861 42,861 42,861 42,861 42,861
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 56,624 56,624 56,624 56,624 56,624 56,624 56,624
4.3 COLUMNAS 3500 PSI M3 ### 822,355 880,497 811,135 837,656 847,857 817,255 832,556
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 253,358 296,837 245,583 263,238 276,651 249,368 268,442
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4.5 DE REFUERZO, CONCRETO DE 3500 PSI
M2 ### 100,635 106,279 99,545 102,120 103,110 100,139 101,625
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
4.6 DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 118,734 125,508 117,427 120,517 121,705 118,140 119,923

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 132,208 141,240 130,465 134,585 136,170 131,416 133,793

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 139,507 149,104 137,655 142,033 143,716 138,666 141,191
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### i 160,000 171,854 157,712 163,119 165,199 158,960 162,079
o

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 178,026 191,573 175,411 181,591 183,968 176,837 180,403

4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 197,604 212,845 194,663 201,615 204,289 196,267 200,278

4.12 ENTREPISO VIGUETA PLACA M2 ### 100,866 101,715 100,702 101,089 101,238 100,791 101,015
4.13 ESCALERA MACIZA 3500 PSI M3 ### 972,629 1,030,771 961,409 987,929 998,130 967,529 982,830
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 97,060 97,910 96,895 97,283 97,433 96,985 97,209
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 80,990 86,804 79,868 82,520 83,540 80,480 82,010
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 91,191 98,304 89,819 93,063 94,311 90,568 92,439
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 106,362 115,281 104,641 108,710 110,274 105,580 107,927
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 720,499 778,641 709,279 735,799 746,000 715,399 730,700
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4.19 M) UN ### 50,036 51,834 49,689 50,509 50,825 49,879 50,352

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 287,706 313,673 282,695 294,540 299,095 285,429 292,262
4.21 ACERO FIGURADO 37000 PSI KG ### 4,260 4,260 4,260 4,260 4,260 4,260 4,260
4.22 ACERO FIGURADO 60000 PSI KG ### 4,468 4,468 4,468 4,468 4,468 4,468 4,468
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,243 6,243 6,243 6,243 6,243 6,243 6,243
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 867,990 926,132 856,770 883,291 893,492 862,890 878,191
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 792,794 856,425 780,515 809,539 820,703 787,213 803,958
4.26 VIGA AÉREA 3500 PSI M3 ### 862,169 920,312 850,950 877,470 887,671 857,070 872,370
4.27 VIGA CINTA 3500 PSI M3 ### 842,098 900,240 830,878 857,398 867,599 836,998 852,299
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,052,776 1,110,919 1,041,557 1,068,077 1,078,278 1,047,677 1,062,977
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 ### 333,764 397,586 321,448 350,559 361,756 328,166 344,961

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,288 31,883 29,980 30,708 30,988 30,148 30,568
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 50,693 52,288 50,385 51,113 51,393 50,553 50,973
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,590 35,987 35,513 35,694 35,764 35,555 35,660
5.4 ARCOS EN LADRILLO PRENSADO ML ### 166,047 166,841 165,894 166,256 166,395 165,977 166,186
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,814 46,611 44,467 45,287 45,602 44,656 45,129
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,678 28,529 27,514 27,902 28,051 27,604 27,828
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 101,556 103,144 101,250 101,974 102,253 101,417 101,835
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### p 93,021 99,013 91,864 94,598 95,649 92,495 94,072
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### i 92,707 92,707 92,707 92,707 92,707 92,707 92,707
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ###
o 54,277 54,277 54,277 54,277 54,277 54,277 54,277
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 89,260 89,260 89,260 89,260 89,260 89,260 89,260
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,553 52,553 52,553 52,553 52,553 52,553 52,553
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 103,651 103,651 103,651 103,651 103,651 103,651 103,651
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 61,071 61,071 61,071 61,071 61,071 61,071 61,071
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 115,347 115,347 115,347 115,347 115,347 115,347 115,347
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,919 66,919 66,919 66,919 66,919 66,919 66,919
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 41,708 42,506 41,554 41,918 42,058 41,638 41,848
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,168 25,567 25,091 25,273 25,343 25,133 25,238
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 54,189 54,721 54,086 54,329 54,422 54,142 54,282
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,474 32,740 32,422 32,544 32,590 32,450 32,520
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 60,911 61,443 60,808 61,051 61,144 60,864 61,004
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,508 36,774 36,457 36,578 36,625 36,485 36,555
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 102,091 104,750 101,578 102,791 103,257 101,858 102,557
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 60,124 61,454 59,868 60,474 60,708 60,008 60,358
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 38,109 38,641 38,006 38,249 38,342 38,062 38,202
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,035 23,301 22,984 23,105 23,152 23,012 23,082
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 75,920 76,983 75,714 76,199 76,386 75,826 76,106
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,621 46,153 45,518 45,761 45,854 45,574 45,714
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 89,841 90,691 89,677 90,065 90,214 89,766 89,990
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 54,259 54,684 54,177 54,371 54,445 54,222 54,334
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 187,122 190,846 186,404 188,102 188,755 186,796 187,776
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 111,955 113,817 111,596 112,445 112,772 111,792 112,282
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 90,968 92,091 90,751 91,264 91,461 90,870 91,165
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,823 55,384 54,714 54,970 55,069 54,773 54,921
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 48,242 49,433 48,013 48,556 48,765 48,138 48,451
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,220 29,815 29,105 29,376 29,481 29,168 29,324
5.37 MURO TOLETE COMÚN 0.06 M M2 ### 34,545 35,077 34,442 34,685 34,778 34,498 34,638
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,978 21,244 20,927 21,048 21,095 20,955 21,025
5.39 MURO TOLETE COMÚN 0.12 M M2 ### 52,433 53,496 52,227 52,713 52,899 52,339 52,619
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,997 32,529 31,895 32,137 32,231 31,951 32,091
5.41 MURO TOLETE COMÚN 0.25 M M2 ### 100,976 102,572 100,669 101,396 101,676 100,836 101,256
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 61,236 62,034 61,082 61,446 61,586 61,166 61,376
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 73,649 74,713 73,444 73,929 74,116 73,556 73,836
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### p 44,321 44,853 44,218 44,461 44,554 44,274 44,414
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### i 155,669 159,392 154,950 156,649 157,302 155,342 156,322
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ###
o 94,247 96,108 93,887 94,737 95,063 94,083 94,573
5.47 REMATES LADRILLO PRENSADO ML ### 32,410 32,807 32,333 32,515 32,584 32,375 32,480
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,641 37,450 36,486 36,854 36,996 36,571 36,783
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,988 63,066 61,780 62,272 62,461 61,894 62,177
5.50 LAVADA DE FACHADA M2 ### 5,260 5,260 5,260 5,260 5,260 5,260 5,260
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,058 52,653 50,750 51,477 51,757 50,918 51,337
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,631 10,631 10,631 10,631 10,631 10,631 10,631
5.53 ANCLAJE 3/8" L=30CM UN ### 14,056 14,056 14,056 14,056 14,056 14,056 14,056
5.54 ANCLAJE 1/2" L=50CM UN ### 18,371 18,371 18,371 18,371 18,371 18,371 18,371
5.55 ANCLAJE 5/8" L=70CM UN ### 25,732 25,732 25,732 25,732 25,732 25,732 25,732
5.56 ANCLAJE 3/4" L=70CM UN ### 38,390 38,390 38,390 38,390 38,390 38,390 38,390
5.57 ANCLAJE 1" L= 70CM UN ### 5,030 5,463 4,946 5,144 5,220 4,992 5,106

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,223 16,223 16,223 16,223 16,223 16,223 16,223
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,981 6,378 5,904 6,085 6,155 5,946 6,051
6.3 FILOS O DILATACIONES S/MURO ML ### 7,167 7,564 7,090 7,271 7,341 7,132 7,236
6.4 GOTERA EN MORTERO 1:4 ML ### 8,464 8,861 8,387 8,568 8,638 8,429 8,534
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,931 6,931 6,931 6,931 6,931 6,931 6,931
6.6 MALLA BAJO ENTRAMADO M2 ### 13,793 13,793 13,793 13,793 13,793 13,793 13,793
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,125 24,911 23,973 24,331 24,469 24,056 24,263
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,656 15,049 14,580 14,760 14,829 14,622 14,725
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,823 22,940 21,608 22,117 22,313 21,725 22,019
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,196 13,754 13,088 13,342 13,440 13,147 13,293
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 20,234 21,020 20,082 20,440 20,578 20,165 20,372
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,401 12,794 12,325 12,504 12,573 12,366 12,470
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,823 22,940 21,608 22,117 22,313 21,725 22,019
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,196 13,754 13,088 13,342 13,440 13,147 13,293
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 21,584 22,144 21,475 21,731 21,829 21,534 21,682
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,074 13,355 13,020 13,148 13,197 13,050 13,124
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,110 18,961 17,945 18,334 18,483 18,035 18,259
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,050 11,476 10,968 11,162 11,237 11,013 11,125
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 16,898 17,497 16,783 17,056 17,161 16,846 17,003
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,445 10,744 10,387 10,523 10,576 10,418 10,497
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### p 22,602 23,719 22,386 22,895 23,091 22,504 22,797
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### i 13,565 14,123 13,457 13,712 13,810 13,516 13,663
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ###
o 21,012 21,798 20,860 21,219 21,357 20,943 21,150
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,770 13,163 12,694 12,873 12,942 12,735 12,839
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,509 18,108 17,393 17,666 17,771 17,456 17,614
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,732 11,031 10,674 10,811 10,863 10,706 10,784
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 21,901 22,687 21,749 22,108 22,246 21,832 22,039
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,619 14,012 13,543 13,722 13,791 13,584 13,688

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 27,841 29,437 27,533 28,261 28,541 27,701 28,121
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE)
M2 ### 84,806 87,802 84,228 85,595 86,120 84,543 85,332
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 56,282 56,282 56,282 56,282 56,282 56,282 56,282
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,429 22,429 22,429 22,429 22,429 22,429 22,429
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,220 35,220 35,220 35,220 35,220 35,220 35,220
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 82,240 82,240 82,240 82,240 82,240 82,240 82,240
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 64,402 64,402 64,402 64,402 64,402 64,402 64,402
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,460 37,460 37,460 37,460 37,460 37,460 37,460
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 86,191 86,191 86,191 86,191 86,191 86,191 86,191
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 102,919 102,919 102,919 102,919 102,919 102,919 102,919
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 151,248 151,248 151,248 151,248 151,248 151,248 151,248
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 59,755 59,755 59,755 59,755 59,755 59,755 59,755
7.13 CANAL PVC AMAZONAS ML ### 83,027 83,027 83,027 83,027 83,027 83,027 83,027
7.14 CANAL PVC RAINGO ML ### 75,484 75,484 75,484 75,484 75,484 75,484 75,484
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 133,968 133,968 133,968 133,968 133,968 133,968 133,968
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 78,240 78,240 78,240 78,240 78,240 78,240 78,240
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 57,477 57,477 57,477 57,477 57,477 57,477 57,477
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,749 32,749 32,749 32,749 32,749 32,749 32,749
7.19 TEJA DE BARRO M2 ### 61,052 63,037 60,669 61,574 61,922 60,878 61,400
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 47,915 47,915 47,915 47,915 47,915 47,915 47,915
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 43,927 43,927 43,927 43,927 43,927 43,927 43,927
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 37,065 37,065 37,065 37,065 37,065 37,065 37,065
7.23 TEJA FIBROCEMENTO No. 6 M2 ### 36,292 36,292 36,292 36,292 36,292 36,292 36,292
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 36,565 36,565 36,565 36,565 36,565 36,565 36,565
7.25 TEJA TERMOACÚSTICA M2 ### 51,455 51,455 51,455 51,455 51,455 51,455 51,455
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
7.26 TEJA PLÁSTICA No.6 M2 ### p 45,241 45,241 45,241 45,241 45,241 45,241 45,241
7.27 TEJA ESPAÑOLA ETERNIT M2 ### i 82,781 82,781 82,781 82,781 82,781 82,781 82,781
o
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 152,835 152,835 152,835 152,835 152,835 152,835 152,835

7.29 TEJA SIN TRASLAPO M2 ### 68,714 68,714 68,714 68,714 68,714 68,714 68,714
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 43,101 43,101 43,101 43,101 43,101 43,101 43,101
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,768 33,768 33,768 33,768 33,768 33,768 33,768
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 58,877 58,877 58,877 58,877 58,877 58,877 58,877
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,264 20,264 20,264 20,264 20,264 20,264 20,264
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,377 24,377 24,377 24,377 24,377 24,377 24,377
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,410 26,410 26,410 26,410 26,410 26,410 26,410
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 34,002 34,002 34,002 34,002 34,002 34,002 34,002
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,450 22,450 22,450 22,450 22,450 22,450 22,450
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,853 52,853 52,853 52,853 52,853 52,853 52,853
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 362,102 362,102 362,102 362,102 362,102 362,102 362,102
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 413,890 413,890 413,890 413,890 413,890 413,890 413,890
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 275,159 275,159 275,159 275,159 275,159 275,159 275,159
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 293,982 293,982 293,982 293,982 293,982 293,982 293,982

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 468,883 530,472 456,998 485,091 495,896 463,481 479,689
8.2 CONCRETO 3500 PSI M3 ### 409,619 466,068 398,726 424,474 434,378 404,668 419,523
8.3 CONCRETO 3000 PSI M3 ### 407,528 465,531 396,335 422,792 432,968 402,441 417,704
8.4 CONCRETO 2500 PSI M3 ### 363,768 423,692 352,204 379,537 390,051 358,512 374,281
8.5 CONCRETO 2000 PSI M3 ### 339,676 400,657 327,909 355,724 366,422 334,328 350,375
8.6 CONCRETO 1500 PSI M3 ### 308,932 370,895 296,975 325,238 336,109 303,497 319,803
8.7 MORTERO SECO 1:10 M3 ### 270,257 325,035 259,686 284,673 294,283 265,452 279,867
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 483,345 536,535 473,081 497,343 506,675 478,679 492,677
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 407,644 445,084 400,419 417,496 424,066 404,360 414,212
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 470,627 505,643 463,870 479,842 485,986 467,556 476,770
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 700,467 735,483 693,710 709,682 715,826 697,396 706,610

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 125,134 125,134 125,134 125,134 125,134 125,134 125,134
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,225 4,622 4,148 4,329 4,399 4,190 4,295
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### p 140,017 140,017 140,017 140,017 140,017 140,017 140,017
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### i 171,480 171,480 171,480 171,480 171,480 171,480 171,480
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ###
o 249,310 249,310 249,310 249,310 249,310 249,310 249,310
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 277,490 277,490 277,490 277,490 277,490 277,490 277,490
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 305,703 305,703 305,703 305,703 305,703 305,703 305,703
9.8 HOJA PUERTA FORTEC 0.81 UN ### 203,024 203,024 203,024 203,024 203,024 203,024 203,024
9.9 HOJA PUERTA FORTEC 0.91 UN ### 230,166 230,166 230,166 230,166 230,166 230,166 230,166
9.10 HOJA PUERTA FORTEC 1.50 UN ### 338,732 338,732 338,732 338,732 338,732 338,732 338,732
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 128,384 128,384 128,384 128,384 128,384 128,384 128,384
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 170,454 170,454 170,454 170,454 170,454 170,454 170,454
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 189,453 189,453 189,453 189,453 189,453 189,453 189,453
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 482,584 482,584 482,584 482,584 482,584 482,584 482,584
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,755 42,755 42,755 42,755 42,755 42,755 42,755
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,622 26,622 26,622 26,622 26,622 26,622 26,622
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 101,075 101,075 101,075 101,075 101,075 101,075 101,075
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 123,447 123,447 123,447 123,447 123,447 123,447 123,447
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 95,898 95,898 95,898 95,898 95,898 95,898 95,898
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,727 29,727 29,727 29,727 29,727 29,727 29,727
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,727 29,727 29,727 29,727 29,727 29,727 29,727
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,180 28,180 28,180 28,180 28,180 28,180 28,180
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 43,096 43,096 43,096 43,096 43,096 43,096 43,096
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 53,377 53,377 53,377 53,377 53,377 53,377 53,377
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 64,341 64,341 64,341 64,341 64,341 64,341 64,341
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 77,363 77,363 77,363 77,363 77,363 77,363 77,363
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 364,453 364,453 364,453 364,453 364,453 364,453 364,453
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 254,802 254,802 254,802 254,802 254,802 254,802 254,802
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 34,187 34,187 34,187 34,187 34,187 34,187 34,187
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 43,782 43,782 43,782 43,782 43,782 43,782 43,782
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 53,377 53,377 53,377 53,377 53,377 53,377 53,377
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 67,083 67,083 67,083 67,083 67,083 67,083 67,083

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 77,286 77,286 77,286 77,286 77,286 77,286 77,286
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 215,118 215,118 215,118 215,118 215,118 215,118 215,118
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO) ML ### 81,806 81,806 81,806 81,806 81,806 81,806 81,806
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 146,346 146,346 146,346 146,346 146,346 146,346 146,346
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### p 138,693 138,693 138,693 138,693 138,693 138,693 138,693
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### i 91,058 91,058 91,058 91,058 91,058 91,058 91,058
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ###
o 214,637 214,637 214,637 214,637 214,637 214,637 214,637
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 111,787 111,787 111,787 111,787 111,787 111,787 111,787
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,705 6,705 6,705 6,705 6,705 6,705 6,705
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 100,897 100,897 100,897 100,897 100,897 100,897 100,897
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA)
10,10(1) H: 2.00 MTS M2 ### 122,945 122,945 122,945 122,945 122,945 122,945 122,945
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,546 41,546 41,546 41,546 41,546 41,546 41,546
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 548,571 548,571 548,571 548,571 548,571 548,571 548,571
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 197,244 197,244 197,244 197,244 197,244 197,244 197,244
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA M2 ### 221,272 221,272 221,272 221,272 221,272 221,272 221,272

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE


10.15 PUERTAS Y ACCESORIOS) M2 ### 500,133 500,133 500,133 500,133 500,133 500,133 500,133

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 130,249 130,249 130,249 130,249 130,249 130,249 130,249

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 400,080 400,080 400,080 400,080 400,080 400,080 400,080
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,126 6,126 6,126 6,126 6,126 6,126 6,126
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 281,315 281,315 281,315 281,315 281,315 281,315 281,315
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 124,009 124,009 124,009 124,009 124,009 124,009 124,009
10.21 REJILLA PISO 0.30 M M2 ### 87,611 87,611 87,611 87,611 87,611 87,611 87,611
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 90,424 90,424 90,424 90,424 90,424 90,424 90,424
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,721 10,721 10,721 10,721 10,721 10,721 10,721
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS
10.24 DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 11,897 11,897 11,897 11,897 11,897 11,897 11,897
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO,
MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA p
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, i
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### o 9,454 9,454 9,454 9,454 9,454 9,454 9,454
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 224,227 224,227 224,227 224,227 224,227 224,227 224,227
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 270,535 270,535 270,535 270,535 270,535 270,535 270,535
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,429 22,429 22,429 22,429 22,429 22,429 22,429
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,220 35,220 35,220 35,220 35,220 35,220 35,220
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,780 33,780 33,780 33,780 33,780 33,780 33,780
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 43,315 43,315 43,315 43,315 43,315 43,315 43,315
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 89,329 89,329 89,329 89,329 89,329 89,329 89,329
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 225,613 225,613 225,613 225,613 225,613 225,613 225,613
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,308 44,308 44,308 44,308 44,308 44,308 44,308
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 35,550 35,550 35,550 35,550 35,550 35,550 35,550
11.13 NIPLE PASAMURO 2" UN ### 67,571 67,571 67,571 67,571 67,571 67,571 67,571
11.14 NIPLE PASAMURO 4" UN ### 100,988 100,988 100,988 100,988 100,988 100,988 100,988
11.15 PUNTO AGUA CALIENTE CPVC UN ### 85,277 85,277 85,277 85,277 85,277 85,277 85,277
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 62,153 62,153 62,153 62,153 62,153 62,153 62,153
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 66,125 66,125 66,125 66,125 66,125 66,125 66,125
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 83,560 83,560 83,560 83,560 83,560 83,560 83,560
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 67,383 67,383 67,383 67,383 67,383 67,383 67,383
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 84,336 84,336 84,336 84,336 84,336 84,336 84,336
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 90,212 90,212 90,212 90,212 90,212 90,212 90,212
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 74,807 74,807 74,807 74,807 74,807 74,807 74,807
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,674 12,674 12,674 12,674 12,674 12,674 12,674
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,849 17,849 17,849 17,849 17,849 17,849 17,849
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,303 23,303 23,303 23,303 23,303 23,303 23,303
11.26 RED SUMINISTRO PVC 1" ML ### 14,392 14,392 14,392 14,392 14,392 14,392 14,392
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,596 8,596 8,596 8,596 8,596 8,596 8,596
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 51,919 51,919 51,919 51,919 51,919 51,919 51,919
11.29 RED SUMINISTRO PVC 2" ML ### 33,209 33,209 33,209 33,209 33,209 33,209 33,209
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,765 10,765 10,765 10,765 10,765 10,765 10,765
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
11.31 RED SANITARIA PVC-S 2" ML ### p 25,648 25,648 25,648 25,648 25,648 25,648 25,648
11.32 RED SANITARIA PVC-S 3" ML ### i 35,587 35,587 35,587 35,587 35,587 35,587 35,587
11.33 RED SANITARIA PVC-S 4" ML ###
o 48,295 48,295 48,295 48,295 48,295 48,295 48,295
11.34 RED SANITARIA PVC-S 6" ML ### 90,305 90,305 90,305 90,305 90,305 90,305 90,305
11.35 REGISTRO 1" UN ### 109,646 109,646 109,646 109,646 109,646 109,646 109,646
11.36 REGISTRO 1/2" UN ### 61,121 61,121 61,121 61,121 61,121 61,121 61,121
11.37 REGISTRO 3/4" UN ### 77,840 77,840 77,840 77,840 77,840 77,840 77,840
11.38 REGISTRO 1 1/2" UN ### 188,086 188,086 188,086 188,086 188,086 188,086 188,086
11.39 REGISTRO 2 1/2" UN ### 387,950 387,950 387,950 387,950 387,950 387,950 387,950
11.40 REGISTRO 2" UN ### 286,597 286,597 286,597 286,597 286,597 286,597 286,597
11.41 REVENTILACIÓN 2" ML ### 17,878 17,878 17,878 17,878 17,878 17,878 17,878
11.42 REVENTILACIÓN 3" ML ### 22,565 22,565 22,565 22,565 22,565 22,565 22,565
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN) UN ### 175,524 175,524 175,524 175,524 175,524 175,524 175,524

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E


11.44 ISNTALACIÓN) UN ### 285,783 285,783 285,783 285,783 285,783 285,783 285,783

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E


11.45 INSTALACIÓN) UN ### 475,629 475,629 475,629 475,629 475,629 475,629 475,629

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11.46 SOPORTES) ML ### 41,132 41,132 41,132 41,132 41,132 41,132 41,132

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE


11.47 ACCESORIOS Y SOPORTES) ML ### 48,505 48,505 48,505 48,505 48,505 48,505 48,505

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.48 SOPORTES) ML ### 62,210 62,210 62,210 62,210 62,210 62,210 62,210

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS


11.49 Y SOPORTES) ML ### 70,571 70,571 70,571 70,571 70,571 70,571 70,571

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE


11.50 ACCESORIOS Y SOPORTES) ML ### 90,946 90,946 90,946 90,946 90,946 90,946 90,946

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS


11.51 Y SOPORTES) ML ### 105,257 105,257 105,257 105,257 105,257 105,257 105,257

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS


11.52 Y SOPORTES) ML ### 155,647 155,647 155,647 155,647 155,647 155,647 155,647

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,696 62,696 62,696 62,696 62,696 62,696 62,696
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,953 62,953 62,953 62,953 62,953 62,953 62,953
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### p 40,617 40,617 40,617 40,617 40,617 40,617 40,617
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### i 50,062 50,062 50,062 50,062 50,062 50,062 50,062
o
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA
11.57 2" ML ### 4,243 4,243 4,243 4,243 4,243 4,243 4,243

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A


11.58 2" ML ### 6,688 6,688 6,688 6,688 6,688 6,688 6,688

11.59 GABINETE TIPO III UN ### 1,033,105 1,033,105 1,033,105 1,033,105 1,033,105 1,033,105 1,033,105
11.60 GABINETE TIPO I UN ### 789,101 789,101 789,101 789,101 789,101 789,101 789,101
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,654,227 2,654,227 2,654,227 2,654,227 2,654,227 2,654,227 2,654,227
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,212,816 2,212,816 2,212,816 2,212,816 2,212,816 2,212,816 2,212,816
11.63 VÁLVULA MARIPOSA 3" UN ### 642,158 642,158 642,158 642,158 642,158 642,158 642,158
11.64 VÁLVULA MARIPOSA 4" UN ### 831,065 831,065 831,065 831,065 831,065 831,065 831,065
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 320,069 320,069 320,069 320,069 320,069 320,069 320,069

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 369,823 369,823 369,823 369,823 369,823 369,823 369,823
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 58,763 58,763 58,763 58,763 58,763 58,763 58,763
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 69,567 69,567 69,567 69,567 69,567 69,567 69,567
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 77,230 77,230 77,230 77,230 77,230 77,230 77,230
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 90,965 90,965 90,965 90,965 90,965 90,965 90,965
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,243 55,243 55,243 55,243 55,243 55,243 55,243
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 62,963 62,963 62,963 62,963 62,963 62,963 62,963
12.8 STRIP TELEFÓNICO 10 PARES UN ### 145,341 145,341 145,341 145,341 145,341 145,341 145,341
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 56,727 56,727 56,727 56,727 56,727 56,727 56,727
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 130,370 130,370 130,370 130,370 130,370 130,370 130,370
12.11 SALIDA T.V PVC COMPLETA. UN ### 77,955 77,955 77,955 77,955 77,955 77,955 77,955
12.12 SALIDA BIFÁSICA C.N. UN ### 46,232 46,232 46,232 46,232 46,232 46,232 46,232
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 97,429 97,429 97,429 97,429 97,429 97,429 97,429
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 415,993 415,993 415,993 415,993 415,993 415,993 415,993
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 554,121 554,121 554,121 554,121 554,121 554,121 554,121
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,588 3,588 3,588 3,588 3,588 3,588 3,588
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,738 4,738 4,738 4,738 4,738 4,738 4,738
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,372 7,372 7,372 7,372 7,372 7,372 7,372
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,185 13,185 13,185 13,185 13,185 13,185 13,185
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 277,059 277,059 277,059 277,059 277,059 277,059 277,059
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 78,271 78,271 78,271 78,271 78,271 78,271 78,271
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### p 105,980 105,980 105,980 105,980 105,980 105,980 105,980
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### i 43,214 43,214 43,214 43,214 43,214 43,214 43,214
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG
o
UN ### 1,420,020 1,420,020 1,420,020 1,420,020 1,420,020 1,420,020 1,420,020
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,052,341 1,052,341 1,052,341 1,052,341 1,052,341 1,052,341 1,052,341
12.26 POSTE METÁLICO 6M UN ### 1,316,549 1,316,549 1,316,549 1,316,549 1,316,549 1,316,549 1,316,549
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 612,714 612,714 612,714 612,714 612,714 612,714 612,714
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 111,818 111,818 111,818 111,818 111,818 111,818 111,818
12.29 LUMINARIA 70W SODIO UN ### 514,087 514,087 514,087 514,087 514,087 514,087 514,087
12.30 LUMINARIA 150W SODIO UN ### 643,181 643,181 643,181 643,181 643,181 643,181 643,181
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,698,893 1,698,893 1,698,893 1,698,893 1,698,893 1,698,893 1,698,893
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,251,057 1,251,057 1,251,057 1,251,057 1,251,057 1,251,057 1,251,057

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 39,847 41,194 39,587 40,201 40,438 39,729 40,083
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,597 40,943 39,337 39,951 40,187 39,479 39,833
13.3 ALISTADO PARA LISTÓN M2 ### 14,805 15,074 14,753 14,876 14,923 14,781 14,852
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 27,493 30,186 26,973 28,202 28,674 27,256 27,965
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 85,574 88,268 85,054 86,283 86,755 85,338 86,047
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,083 28,302 26,847 27,404 27,618 26,976 27,297
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 59,163 65,156 58,007 60,740 61,792 58,638 60,215
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 82,235 91,823 80,385 84,758 86,440 81,394 83,917
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,943 30,943 30,943 30,943 30,943 30,943 30,943
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,371 23,371 23,371 23,371 23,371 23,371 23,371
13.11 PERMA PLY 2 CAPAS M2 ### 27,419 27,419 27,419 27,419 27,419 27,419 27,419
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 48,227 53,620 47,186 49,646 50,592 47,754 49,173
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 56,544 63,136 55,272 58,278 59,435 55,966 57,700
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 82,059 92,246 80,093 84,740 86,527 81,166 83,846
13.15 TRITURADO FINO 1/2 M3 ### 106,952 150,758 98,499 118,480 126,166 103,110 114,638
13.16 TRITURADO GRUESO 3/4 M3 ### 105,615 153,369 100,693 124,989 126,895 108,045 121,450

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 58,128 58,667 58,024 58,270 58,365 58,081 58,223

14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,736 35,005 34,684 34,807 34,854 34,713 34,783

14.3 ADOQUÍN CONCRETO 6CM M2 ### 66,173 67,519 65,913 66,527 66,763 66,055 66,409
14.4 ADOQUÍN CONCRETO 8CM M2 ### 69,573 70,919 69,313 69,927 70,163 69,455 69,809
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
14.5 ADOQUÍN GRES PEATONAL M2 ### p 73,904 75,250 73,644 74,258 74,494 73,786 74,140
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO i
14.6 BLANCO. INCLUYE ALISTADO M2 ### o 76,750 77,288 76,646 76,891 76,986 76,702 76,844
14.7 GRAVILLA PARA GRADAS ML ### 37,639 38,316 37,509 37,817 37,936 37,580 37,758
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 166,618 169,042 166,150 167,256 167,681 166,405 167,043
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 46,857 48,479 46,544 47,284 47,568 46,715 47,142
14.10 GUARDAESCOBA EN GRANITO ML ### 44,626 44,626 44,626 44,626 44,626 44,626 44,626
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,280 10,956 10,149 10,458 10,576 10,220 10,398
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,597 9,597 9,597 9,597 9,597 9,597 9,597
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,885 12,885 12,885 12,885 12,885 12,885 12,885
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,744 10,744 10,744 10,744 10,744 10,744 10,744
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,011 18,011 18,011 18,011 18,011 18,011 18,011
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,110 35,110 35,110 35,110 35,110 35,110 35,110
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,381 9,381 9,381 9,381 9,381 9,381 9,381
14.18 LISTÓN M.H. AMARILLO M2 ### 75,959 75,959 75,959 75,959 75,959 75,959 75,959
14.19 PASO ESCALERA GRANITO ML ### 120,261 122,147 119,897 120,757 121,088 120,096 120,592
14.20 PIRLANES ALUMINIO ML ### 7,664 7,664 7,664 7,664 7,664 7,664 7,664
14.21 PIRLANES LADRILLO ML ### 33,004 33,798 32,851 33,213 33,352 32,934 33,143
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 46,926 46,926 46,926 46,926 46,926 46,926 46,926
14.23 PISO VINILO TRÁFICO PESADO M2 ### 54,546 54,546 54,546 54,546 54,546 54,546 54,546
14.24 PULIDA LACADA PISO MADERA M2 ### 50,191 50,191 50,191 50,191 50,191 50,191 50,191
14.25 TABLETA DE GRES 25X25 M2 ### 50,386 50,925 50,282 50,528 50,623 50,339 50,481
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,593 57,132 56,489 56,735 56,829 56,546 56,688
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,149 11,149 11,149 11,149 11,149 11,149 11,149
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 51,173 52,363 50,943 51,486 51,695 51,068 51,381
14.29 JABONERA PORCELANA ACUARIO UN ### 21,077 21,077 21,077 21,077 21,077 21,077 21,077
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 126,174 126,174 126,174 126,174 126,174 126,174 126,174
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,133 10,133 10,133 10,133 10,133 10,133 10,133
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,000 23,000 23,000 23,000 23,000 23,000 23,000
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,747 14,747 14,747 14,747 14,747 14,747 14,747
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,327 14,327 14,327 14,327 14,327 14,327 14,327
14.35 REMATES BOCEL ALUMINIO ML ### 8,704 8,704 8,704 8,704 8,704 8,704 8,704
14.36 REMATES BOCEL PORCELANA ML ### 8,857 8,857 8,857 8,857 8,857 8,857 8,857
14.37 TAPA REGISTRO 20X20 UN ### 19,482 19,482 19,482 19,482 19,482 19,482 19,482
14.38 TAPA REGISTRO 6X6 UN ### 17,753 17,753 17,753 17,753 17,753 17,753 17,753
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### i 19,135 19,135 19,135 19,135 19,135 19,135 19,135
o
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO M2 ### 22,120 22,120 22,120 22,120 22,120 22,120 22,120
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 66,521 67,059 66,417 66,663 66,757 66,474 66,615
14.42 MEDIA CAÑA EN GRANITO ML ### 79,317 79,317 79,317 79,317 79,317 79,317 79,317
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 34,692 34,692 34,692 34,692 34,692 34,692 34,692
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,554 13,554 13,554 13,554 13,554 13,554 13,554
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 104,221 104,221 104,221 104,221 104,221 104,221 104,221
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 126,107 126,107 126,107 126,107 126,107 126,107 126,107

15 CIELO RASO
15.1 APLIQUE YESO ML ### 74,518 74,518 74,518 74,518 74,518 74,518 74,518
15.2 ARMADURA MADERA Y MALLA M2 ### 36,595 36,595 36,595 36,595 36,595 36,595 36,595
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 56,610 56,610 56,610 56,610 56,610 56,610 56,610
15.4 CIELO RASO DURACUSTIC M2 ### 69,490 69,490 69,490 69,490 69,490 69,490 69,490
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,856 51,856 51,856 51,856 51,856 51,856 51,856
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 96,198 96,198 96,198 96,198 96,198 96,198 96,198
15.7 CORNISAS YESO ML ### 50,025 50,025 50,025 50,025 50,025 50,025 50,025
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 106,355 106,355 106,355 106,355 106,355 106,355 106,355
15.9 MALLA CON VENA M2 ### 13,695 13,695 13,695 13,695 13,695 13,695 13,695

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
16.2 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 43,707 43,707 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 49,987 49,987 49,987 49,987 49,987 49,987 49,987

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 85,005 85,005 85,005 85,005 85,005 85,005 85,005

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114

16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 75,369 126,771 83,936 118,204 99,357 99,357 116,491
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### p 110,017 154,785 101,378 121,798 129,652 106,090 117,871
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO i
16.10 MECÁNICAMENTE M3 ### o 185,925 264,804 204,835 184,274 263,091 221,969 256,237
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 64,799 116,201 73,366 107,634 88,787 88,787 105,921
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 159,397 233,970 174,001 153,440 232,257 191,135 225,403
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 182,894 261,773 201,804 181,243 260,060 218,938 253,206

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 308,940 308,940 308,940 308,940 308,940 308,940 308,940

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE


17.2 GRIFERÍA) UN ### 911,043 911,043 911,043 911,043 911,043 911,043 911,043

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 493,560 493,560 493,560 493,560 493,560 493,560 493,560

17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 142,933 142,933 142,933 142,933 142,933 142,933 142,933

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE


17.5 GRIFERÍA) UN ### 200,237 200,237 200,237 200,237 200,237 200,237 200,237

SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE


17.6 GRIFERÍA) UN ### 185,946 185,946 185,946 185,946 185,946 185,946 185,946

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 409,556 409,556 409,556 409,556 409,556 409,556 409,556

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE


17.8 GRIFERÍA) UN ### 1,047,756 1,047,756 1,047,756 1,047,756 1,047,756 1,047,756 1,047,756

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 297,461 297,461 297,461 297,461 297,461 297,461 297,461

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A


17.10 BAÑERA
UN ### 210,652 210,652 210,652 210,652 210,652 210,652 210,652
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 83,720 83,720 83,720 83,720 83,720 83,720 83,720
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 255,119 255,119 255,119 255,119 255,119 255,119 255,119
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 375,900 375,900 375,900 375,900 375,900 375,900 375,900

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,480 8,480 8,480 8,480 8,480 8,480 8,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### p 3,146 3,146 3,146 3,146 3,146 3,146 3,146
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### i 11,284 11,284 11,284 11,284 11,284 11,284 11,284
18.4 BARNIZ SOBRE MUEBLES M2 ###
o 42,981 42,981 42,981 42,981 42,981 42,981 42,981
18.5 CARBURO SOBRE PAÑETES M2 ### 5,916 5,916 5,916 5,916 5,916 5,916 5,916
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 67,173 67,173 67,173 67,173 67,173 67,173 67,173
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,516 3,516 3,516 3,516 3,516 3,516 3,516
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,822 2,822 2,822 2,822 2,822 2,822 2,822
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,155 14,155 14,155 14,155 14,155 14,155 14,155
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,102 4,102 4,102 4,102 4,102 4,102 4,102
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 14,926 14,926 14,926 14,926 14,926 14,926 14,926
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,854 5,854 5,854 5,854 5,854 5,854 5,854
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,659 6,659 6,659 6,659 6,659 6,659 6,659
18.14 ESTUCO M2 ### 7,110 7,110 7,110 7,110 7,110 7,110 7,110
18.15 ESTUCO (LINEAL) ML ### 4,450 4,450 4,450 4,450 4,450 4,450 4,450
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 15,751 15,751 15,751 15,751 15,751 15,751 15,751
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,754 9,754 9,754 9,754 9,754 9,754 9,754
18.18 LACA PISOS MADERA M2 ### 23,062 23,062 23,062 23,062 23,062 23,062 23,062
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,725 2,725 2,725 2,725 2,725 2,725 2,725
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,401 12,401 12,401 12,401 12,401 12,401 12,401
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,345 3,345 3,345 3,345 3,345 3,345 3,345
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,794 12,794 12,794 12,794 12,794 12,794 12,794
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,192 7,192 7,192 7,192 7,192 7,192 7,192
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,516 4,516 4,516 4,516 4,516 4,516 4,516
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,202 22,202 22,202 22,202 22,202 22,202 22,202
18.26 PINTURA EPÓXICA M2 ### 12,861 12,861 12,861 12,861 12,861 12,861 12,861
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,940 7,940 7,940 7,940 7,940 7,940 7,940

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,205,579 6,205,579 6,205,579 6,205,579 6,205,579 6,205,579 6,205,579
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,964,286 10,964,286 10,964,286 10,964,286 10,964,286 10,964,286 10,964,286
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,869,340 2,869,340 2,869,340 2,869,340 2,869,340 2,869,340 2,869,340
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,377,256 9,377,256 9,377,256 9,377,256 9,377,256 9,377,256 9,377,256
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,781,690 8,781,690 8,781,690 8,781,690 8,781,690 8,781,690 8,781,690
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,725 2,725 2,725 2,725 2,725 2,725 2,725
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 880,441 880,441 880,441 880,441 880,441 880,441 880,441
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 87,999 87,999 87,999 87,999 87,999 87,999 87,999
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### p 1,593,659 1,594,275 1,593,540 1,593,821 1,593,929 1,593,605 1,593,767
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### i 691,169 705,670 688,371 694,985 697,529 689,897 693,713
o
20 INSTALACIONES RED GASES
20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,860 29,860 29,860 29,860 29,860 29,860 29,860
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,436 44,436 44,436 44,436 44,436 44,436 44,436
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 55,115 55,115 55,115 55,115 55,115 55,115 55,115

20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 17,910 17,910 17,910 17,910 17,910 17,910 17,910

20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,715 21,715 21,715 21,715 21,715 21,715 21,715

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,630 29,630 29,630 29,630 29,630 29,630 29,630

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,429 26,429 26,429 26,429 26,429 26,429 26,429
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,867 27,867 27,867 27,867 27,867 27,867 27,867
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,870 34,870 34,870 34,870 34,870 34,870 34,870
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,998 17,998 17,998 17,998 17,998 17,998 17,998
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,602 23,602 23,602 23,602 23,602 23,602 23,602
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,325 36,325 36,325 36,325 36,325 36,325 36,325
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 278,697 278,697 278,697 278,697 278,697 278,697 278,697
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 320,783 320,783 320,783 320,783 320,783 320,783 320,783
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 334,519 334,519 334,519 334,519 334,519 334,519 334,519
20.16 ACOMETIDA GAS 1/2" ML ### 310,170 310,170 310,170 310,170 310,170 310,170 310,170

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 226,448 226,448 226,448 226,448 226,448 226,448 226,448
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 34,736 34,736 34,736 34,736 34,736 34,736 34,736
21.3 SIRENA DE 110 V UN ### 105,628 105,628 105,628 105,628 105,628 105,628 105,628
21.4 CÁMARA CCTV UN ### 267,539 267,539 267,539 267,539 267,539 267,539 267,539
21.5 PARLANTE-CIELO FALSO UN ### 52,959 52,959 52,959 52,959 52,959 52,959 52,959
21.6 AMPLIFICADOR 100W UN ### 585,066 585,066 585,066 585,066 585,066 585,066 585,066
21.7 AMPLIFICADOR 300W UN ### 1,452,240 1,452,240 1,452,240 1,452,240 1,452,240 1,452,240 1,452,240
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,262 45,262 45,262 45,262 45,262 45,262 45,262
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 226,593 226,593 226,593 226,593 226,593 226,593 226,593
21.10 TOMA PARA MICRÓFONO UN ### 44,714 44,714 44,714 44,714 44,714 44,714 44,714
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,836 3,836 3,836 3,836 3,836 3,836 3,836
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
21.12 SPLITERS UN ### p 6,454 6,454 6,454 6,454 6,454 6,454 6,454
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### i 18,872 18,872 18,872 18,872 18,872 18,872 18,872
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ###
o 24,746 24,746 24,746 24,746 24,746 24,746 24,746
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 32,142 32,142 32,142 32,142 32,142 32,142 32,142
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 125,378 125,378 125,378 125,378 125,378 125,378 125,378
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,706 32,706 32,706 32,706 32,706 32,706 32,706
21.18 BANDEJA PORTACABLES PARA RACK UN ### 107,030 107,030 107,030 107,030 107,030 107,030 107,030
21.19 RACK 2' X 24" UN ### 186,761 186,761 186,761 186,761 186,761 186,761 186,761
21.20 RACK 3' X 24" UN ### 293,971 293,971 293,971 293,971 293,971 293,971 293,971
21.21 RACK 5' X 24" UN ### 364,959 364,959 364,959 364,959 364,959 364,959 364,959
21.22 RACK 7' X 24" UN ### 398,886 398,886 398,886 398,886 398,886 398,886 398,886
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 583,489 583,489 583,489 583,489 583,489 583,489 583,489
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 343,530 343,530 343,530 343,530 343,530 343,530 343,530
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 106,259 106,259 106,259 106,259 106,259 106,259 106,259
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,163 14,163 14,163 14,163 14,163 14,163 14,163
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,955 28,955 28,955 28,955 28,955 28,955 28,955
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,093 5,093 5,093 5,093 5,093 5,093 5,093
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,848 35,848 35,848 35,848 35,848 35,848 35,848
21.30 CANALETA METÁLICA 4X10 CMS ML ### 37,466 37,466 37,466 37,466 37,466 37,466 37,466
21.31 CANALETA METÁLICA 6X10 CMS ML ### 38,273 38,273 38,273 38,273 38,273 38,273 38,273
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,962 24,962 24,962 24,962 24,962 24,962 24,962
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,622 27,622 27,622 27,622 27,622 27,622 27,622
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,739 28,739 28,739 28,739 28,739 28,739 28,739
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 48,385 48,385 48,385 48,385 48,385 48,385 48,385
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 626,457 626,457 626,457 626,457 626,457 626,457 626,457
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 321,581 321,581 321,581 321,581 321,581 321,581 321,581
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 89,988 89,988 89,988 89,988 89,988 89,988 89,988
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,869 1,869 1,869 1,869 1,869 1,869 1,869
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,630 8,630 8,630 8,630 8,630 8,630 8,630
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,883 12,883 12,883 12,883 12,883 12,883 12,883
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,513 21,513 21,513 21,513 21,513 21,513 21,513
21.43 CABLE TELEVISIÓN RG6 ML ### 3,982 3,982 3,982 3,982 3,982 3,982 3,982
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,602 22,602 22,602 22,602 22,602 22,602 22,602
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,922 32,922 32,922 32,922 32,922 32,922 32,922
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,660 19,660 19,660 19,660 19,660 19,660 19,660
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN) ML ### 15,655 15,655 15,655 15,655 15,655 15,655 15,655
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### p 632,723 632,723 632,723 632,723 632,723 632,723 632,723
i
o
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p URBANISMO
i
1 ACUEDUCTO o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 92,611 92,611 92,611 92,611 92,611 92,611 92,611
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 521,652 521,652 521,652 521,652 521,652 521,652 521,652
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,113,416 1,113,416 1,113,416 1,113,416 1,113,416 1,113,416 1,113,416
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 127,628 127,628 127,628 127,628 127,628 127,628 127,628
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 777,523 777,523 777,523 777,523 777,523 777,523 777,523
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,673,343 1,673,343 1,673,343 1,673,343 1,673,343 1,673,343 1,673,343
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,332 13,332 13,332 13,332 13,332 13,332 13,332
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,449 16,449 16,449 16,449 16,449 16,449 16,449
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,661 20,661 20,661 20,661 20,661 20,661 20,661
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,615 22,615 22,615 22,615 22,615 22,615 22,615
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,116 27,116 27,116 27,116 27,116 27,116 27,116
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,116 27,116 27,116 27,116 27,116 27,116 27,116
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 109,083 109,083 109,083 109,083 109,083 109,083 109,083
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 126,349 126,349 126,349 126,349 126,349 126,349 126,349
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 391,025 391,025 391,025 391,025 391,025 391,025 391,025
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 146,837 146,837 146,837 146,837 146,837 146,837 146,837
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 242,060 242,060 242,060 242,060 242,060 242,060 242,060
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,071,196 1,071,196 1,071,196 1,071,196 1,071,196 1,071,196 1,071,196
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,234,182 1,234,182 1,234,182 1,234,182 1,234,182 1,234,182 1,234,182
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,469 14,469 14,469 14,469 14,469 14,469 14,469
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,766 12,766 12,766 12,766 12,766 12,766 12,766
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,551 31,551 31,551 31,551 31,551 31,551 31,551
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 125,145 125,145 125,145 125,145 125,145 125,145 125,145
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 186,374 186,374 186,374 186,374 186,374 186,374 186,374
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,451 30,451 30,451 30,451 30,451 30,451 30,451
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 104,908 104,908 104,908 104,908 104,908 104,908 104,908
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 155,473 155,473 155,473 155,473 155,473 155,473 155,473
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,779 30,779 30,779 30,779 30,779 30,779 30,779
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 63,468 63,468 63,468 63,468 63,468 63,468 63,468
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 255,654 255,654 255,654 255,654 255,654 255,654 255,654
1.32 UNIÓN REPARACION PVC 4" UN ### 74,053 74,053 74,053 74,053 74,053 74,053 74,053
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 297,453 297,453 297,453 297,453 297,453 297,453 297,453
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 178,297 178,297 178,297 178,297 178,297 178,297 178,297
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### p 507,607 507,607 507,607 507,607 507,607 507,607 507,607
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### i 1,359,804 1,359,804 1,359,804 1,359,804 1,359,804 1,359,804 1,359,804
1.37 VÁLVULA COMPUERTA ELÁSTICA 8"
o
UN ### 2,009,272 2,009,272 2,009,272 2,009,272 2,009,272 2,009,272 2,009,272

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 10,882 10,882 10,882 10,882 10,882 10,882 10,882
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 24,861 24,861 24,861 24,861 24,861 24,861 24,861
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 94,409 139,065 85,792 106,160 113,996 90,492 102,244
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 70,335 121,737 78,902 113,170 94,323 94,323 111,457
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 69,859 121,261 78,426 112,694 93,847 93,847 110,981
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 108,126 126,574 106,077 109,151 126,574 106,077 129,648
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 58,126 76,932 56,037 59,171 76,932 56,037 80,066
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 118,292 169,894 108,334 131,872 140,925 113,765 127,345

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 116,610 116,610 116,610 116,610 116,610 116,610 116,610
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,215,957 1,215,957 1,215,957 1,215,957 1,215,957 1,215,957 1,215,957
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 152,396 152,396 152,396 152,396 152,396 152,396 152,396
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,408,391 1,408,391 1,408,391 1,408,391 1,408,391 1,408,391 1,408,391
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 981,623 981,623 981,623 981,623 981,623 981,623 981,623
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,873 62,873 62,873 62,873 62,873 62,873 62,873
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 115,757 115,757 115,757 115,757 115,757 115,757 115,757
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 273,358 273,358 273,358 273,358 273,358 273,358 273,358
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 273,351 273,351 273,351 273,351 273,351 273,351 273,351
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 438,867 438,867 438,867 438,867 438,867 438,867 438,867
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 115,806 115,806 115,806 115,806 115,806 115,806 115,806
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 115,806 115,806 115,806 115,806 115,806 115,806 115,806
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 273,358 273,358 273,358 273,358 273,358 273,358 273,358
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 273,358 273,358 273,358 273,358 273,358 273,358 273,358
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 438,867 438,867 438,867 438,867 438,867 438,867 438,867
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 440,630 440,630 440,630 440,630 440,630 440,630 440,630
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 715,521 715,521 715,521 715,521 715,521 715,521 715,521
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,148,394 1,148,394 1,148,394 1,148,394 1,148,394 1,148,394 1,148,394
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 70,958 70,958 70,958 70,958 70,958 70,958 70,958
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 368,704 368,704 368,704 368,704 368,704 368,704 368,704
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### p 413,420 413,420 413,420 413,420 413,420 413,420 413,420
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### i 1,144,263 1,144,263 1,144,263 1,144,263 1,144,263 1,144,263 1,144,263
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ###
o 67,143 67,675 67,040 67,283 67,376 67,096 67,236
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 334,237 334,237 334,237 334,237 334,237 334,237 334,237
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 50,862 50,862 50,862 50,862 50,862 50,862 50,862
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 71,940 71,940 71,940 71,940 71,940 71,940 71,940
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 103,822 103,822 103,822 103,822 103,822 103,822 103,822
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 159,372 159,372 159,372 159,372 159,372 159,372 159,372
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 256,147 256,147 256,147 256,147 256,147 256,147 256,147
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 371,659 371,659 371,659 371,659 371,659 371,659 371,659
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 470,328 470,328 470,328 470,328 470,328 470,328 470,328
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 618,405 618,405 618,405 618,405 618,405 618,405 618,405
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 850,646 850,646 850,646 850,646 850,646 850,646 850,646

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO) UN ### 680,731 715,533 674,016 689,890 695,995 677,679 686,837

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.


4.2 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 650,055 667,213 646,744 654,571 657,581 648,551 653,065
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
4.3 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 724,396 747,597 719,919 730,502 734,572 722,361 728,467
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4.4 REFUERZO) UN ### 808,881 852,383 800,486 820,329 827,961 805,065 816,513
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
4.5 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 923,815 947,976 919,152 930,173 934,412 921,696 928,053
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4.6 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 836,907 868,809 830,751 845,303 850,899 834,110 842,504
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,001,864 1,017,847 998,776 1,006,071 1,008,873 1,000,459 1,004,666
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,456,104 1,503,699 1,446,914 1,468,631 1,476,978 1,451,925 1,464,451
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,003,975 2,096,576 1,986,106 2,028,344 2,044,590 1,995,853 2,020,222
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,663,291 2,817,220 2,633,588 2,703,799 2,730,805 2,649,791 2,690,298
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,860,310 1,860,310 1,860,310 1,860,310 1,860,310 1,860,310 1,860,310
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,936,598 3,936,598 3,936,598 3,936,598 3,936,598 3,936,598 3,936,598
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN) UN ### 139,625 140,325 139,490 139,809 139,932 139,564 139,748

5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### p 75,356 78,134 74,819 76,087 76,574 75,112 75,843
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### i 89,084 91,862 88,547 89,815 90,302 88,840 89,571
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ###
o 57,247 63,539 56,033 58,903 60,007 56,695 58,351
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 61,842 67,932 60,667 63,445 64,513 61,308 62,910
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 62,061 67,989 60,918 63,621 64,661 61,542 63,101
5.6 BORDE SEPARADOR VERDE A-170 ML ### 257,093 257,793 256,957 257,277 257,400 257,031 257,215
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,610 19,365 18,464 18,808 18,941 18,544 18,742
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,945 45,379 40,089 42,112 42,890 40,556 41,723
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 84,235 84,609 84,162 84,333 84,399 84,202 84,300
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 559,090 569,996 556,986 561,960 563,874 558,134 561,004
5.11 LOSETA PREFABRICADA A-40 M2 ### 62,440 64,043 62,131 62,862 63,143 62,300 62,722
5.12 LOSETA PREFABRICADA A-60 M2 ### 91,095 92,698 90,786 91,517 91,798 90,955 91,376
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 33,914 36,350 33,444 34,555 34,982 33,700 34,341

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 54,706 59,636 53,754 56,003 56,868 54,273 55,571
5.15 SARDINEL PREFABRICADO A-10 ML ### 104,716 114,964 107,553 105,335 114,555 109,582 113,661
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,418 61,388 60,231 60,674 60,844 60,333 60,589

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 205,779 208,679 205,219 206,542 207,051 205,524 206,287
6.2 BANCA EN CONCRETO M-30 UN ### 675,757 679,817 674,973 676,825 677,538 675,401 676,469
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 217,425 218,035 217,307 217,586 217,693 217,372 217,532
6.4 BOLARDO M-60 CONCRETO UN ### 164,129 167,610 163,458 165,045 165,656 163,824 164,740
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 165,997 169,477 165,326 166,913 167,524 165,692 166,608
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 194,691 198,350 193,985 195,654 196,296 194,370 195,333
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 60,209 62,337 59,798 60,769 61,142 60,022 60,582
6.8 BORDILLO PREFABRICADO A-80 ML ### 69,835 72,216 69,375 70,461 70,879 69,626 70,252
6.9 CANECA M-120 UN ### 316,142 316,674 316,039 316,282 316,375 316,095 316,235
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 833,220 834,960 832,884 833,678 833,983 833,067 833,525
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,420,128 3,421,288 3,419,904 3,420,433 3,420,637 3,420,026 3,420,332
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,518,359 3,519,519 3,518,135 3,518,664 3,518,868 3,518,257 3,518,563
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 491,941 493,160 491,705 492,262 492,476 491,834 492,155
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 652,058 656,937 651,117 653,342 654,198 651,631 652,914
6.15 BANCA EN MADERA M-50 UN ### 541,109 541,109 541,109 541,109 541,109 541,109 541,109
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 250,774 252,515 250,439 251,232 251,538 250,622 251,080
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 583,143 584,473 582,887 583,493 583,727 583,027 583,377
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
6.18 POSTE HISTÓRICO M-131 UN ### p 6,502,187 6,510,887 6,500,508 6,504,476 6,506,003 6,501,424 6,503,713
i
7 SEÑALIZACIÓN
o
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,086 4,086 4,086 4,086 4,086 4,086 4,086
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,800 43,800 43,800 43,800 43,800 43,800 43,800
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 317,078 317,428 317,010 317,170 317,232 317,047 317,139
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 499,927 502,366 499,456 500,569 500,997 499,713 500,355
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 236,924 237,274 236,857 237,016 237,078 236,893 236,986
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 251,662 252,012 251,595 251,754 251,816 251,631 251,724
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 262,823 263,173 262,756 262,915 262,977 262,792 262,885
7.8 TACHAS REFLECTIVAS UN ### 13,700 13,700 13,700 13,700 13,700 13,700 13,700
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,632 14,632 14,632 14,632 14,632 14,632 14,632
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 119,151 119,151 119,151 119,151 119,151 119,151 119,151
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
p
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS M3 ### 9,548 9,548 9,548 9,548 9,548 9,548 9,548

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,493 35,493 35,493 35,493 35,493 35,493 35,493

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y


2.3 210.2.2 PRÉSTAMOS M3 ### 8,749 8,749 8,749 8,749 8,749 8,749 8,749
2.4 220.1 TERRAPLENES M3 ### 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,499 7,499 7,499 7,499 7,499 7,499 7,499
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 EXISTENTE M2 ### 481 481 481 481 481 481 481

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE


2.8 230.2 MATERIAL ADICIONADO M3 ### 12,832 12,832 12,832 12,832 12,832 12,832 12,832

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 20,948 20,948 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 65,185 65,185 65,185 65,185 65,185 65,185 65,185
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 79,958 79,958 79,958 79,958 79,958 79,958 79,958
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO
2.12 600.4 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,035 19,035 19,035 19,035 19,035 19,035 19,035
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE p 39,738
2.13 600.4 P M3 ### 39,738 39,738 39,738 39,738 39,738 39,738
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE o
2.14 600.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 31,203 31,203 31,203 31,203 31,203 31,203 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO
2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 53,644 53,644 53,644 53,644 53,644 53,644 53,644

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,366 5,366 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3 ### 159,397 233,970 174,001 153,440 232,257 191,135 225,403
3.3 330.1 BASE GRANULAR M3 ### 182,894 261,773 201,804 181,243 260,060 218,938 253,206
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 139,125 139,125 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,251 3,251 3,251 3,251 3,251 3,251 3,251
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,127 1,127 1,127 1,127 1,127 1,127 1,127
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
3.7 461.1 ASFÁLTICA M3 ### 228,446 240,567 226,107 231,636 233,762 227,383 230,573
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 66,007 68,637 65,500 66,699 67,161 65,776 66,468
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO) M3 ### 644,004 670,364 645,652 587,989 622,587 660,479 637,414
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3.10 450.2 P ASFÁLTICO) M3 ### 649,954 676,314 651,602 593,939 628,537 666,429 643,364
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3.11 450.9 P ASFÁLTICO)
M3 ### 686,857 713,217 688,504 630,842 665,439 703,332 680,267
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3.12 450.3 P ASFÁLTICO) M3 ### 679,704 706,064 681,352 623,689 658,287 696,179 673,114
3,12(1) P MEZCLA ASFALTICA NATURAL M3 ### 411,620 442,644 402,675 396,974 398,006 414,914 408,841
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 332,452 411,331 351,362 330,801 409,618 368,496 402,764
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 307,774 382,347 322,378 301,817 380,633 339,512 373,780
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 38,791 38,791 38,791 38,791 38,791 38,791 38,791
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 172,413 172,413 172,413 172,413 172,413 172,413 172,413
3.15 311.1 AFIRMADO M3 ### 64,799 116,201 73,366 107,634 88,787 88,787 105,921
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,898 12,748 11,734 12,122 12,271 11,823 12,047
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,803 5,229 4,721 4,915 4,990 4,766 4,878
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 647,188 702,951 636,428 661,863 671,646 642,297 656,972
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE
3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 679,921 738,181 668,679 695,253 705,474 674,811 690,143
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE p 701,744
3.20 500.1 M3 ### 761,687 690,177 717,519 728,035 696,487 712,261
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN i
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE o
3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,079 7,079 7,079 7,079 7,079 7,079 7,079
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 86,845 112,942 83,946 88,295 112,942 83,946 117,291

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 922,777 986,030 910,571 939,423 950,520 917,229 933,875
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 796,338 858,543 784,334 812,708 823,621 790,882 807,252
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 842,929 907,597 830,450 859,947 871,293 837,257 854,275
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 577,450 634,463 566,448 592,453 602,457 572,449 587,453
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 673,912 733,183 662,474 689,510 699,909 668,713 684,311
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 575,338 633,921 564,033 590,755 601,032 570,200 585,616
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 671,716 732,620 659,964 687,744 698,428 666,375 682,401
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 734,369 792,952 723,064 749,786 760,064 729,231 744,647
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 595,006 655,909 583,254 611,033 621,718 589,665 605,691
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 778,506 839,409 766,754 794,533 805,218 773,165 789,191
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P ACERO A-36 KG ### 11,944 11,944 11,944 11,944 11,944 11,944 11,944
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE
4.12 650 P DE ACERO A-588 GRADO B KG ### 15,338 15,338 15,338 15,338 15,338 15,338 15,338
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,802 1,802 1,802 1,802 1,802 1,802 1,802
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,707,971 2,707,971 2,707,971 2,707,971 2,707,971 2,707,971 2,707,971
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN
4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,143,471 4,251,667 4,122,591 4,171,943 4,190,926 4,133,981 4,162,453
REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4.16 621.2 REFUERZO) M3 ### 1,728,955 1,786,958 1,717,762 1,744,219 1,754,395 1,723,868 1,739,131
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 87,951 87,951 87,951 87,951 87,951 87,951 87,951
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 362,454 369,414 361,110 364,285 365,506 361,843 363,675
4.19 632 P BARANDA METÁLICA ML ### 425,538 425,538 425,538 425,538 425,538 425,538 425,538
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,072 17,072 17,072 17,072 17,072 17,072 17,072
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 487,400 580,754 480,761 530,002 529,233 496,748 523,534
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 125,311 151,407 122,411 126,761 151,407 122,411 155,757
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 75,640 123,088 83,548 115,180 97,782 97,782 113,598
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 388,791 450,382 376,906 405,000 415,805 383,390 399,597
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### p 365,524 411,603 357,410 375,680 391,062 361,261 383,015
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA i
4.26 630.7 ELEVACIONES M3 ### o 374,167 420,246 366,053 384,323 399,705 369,904 391,658
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 379,980 425,424 371,987 389,968 405,239 375,772 397,359
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 388,623 434,067 380,630 398,611 413,882 384,415 406,002
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 525,404 585,927 513,724 541,331 551,950 520,095 536,022
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 620,032 682,952 607,890 636,589 647,629 614,513 631,070
4.31 681.1 GAVIÓN M3 ### 175,509 200,419 172,741 176,892 200,419 172,741 204,570
4.32 681.1 GAVIÓN MALLA PVC M3 ### 179,716 204,626 176,948 181,099 204,626 176,948 208,777
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4.33 672.1 2500 PSI ML ### 42,806 46,521 42,089 43,783 44,435 42,480 43,457

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,


4.34 672.1 2500 PSI ML ### 16,587 18,445 16,229 17,076 17,402 16,424 16,913

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO


4.35 *** (RESISTENCIA ÚLTIMA 25 KN) M2 ### 10,197 10,197 10,197 10,197 10,197 10,197 10,197

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,540 14,540 14,540 14,540 14,540 14,540 14,540

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,569 19,569 19,569 19,569 19,569 19,569 19,569
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 23,458 23,458 23,458 23,458 23,458 23,458 23,458
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 30,144 30,144 30,144 30,144 30,144 30,144 30,144
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800
4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 7,318 7,318 7,318 7,318 7,318 7,318 7,318

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,339 8,339 8,339 8,339 8,339 8,339 8,339

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,668 8,668 8,668 8,668 8,668 8,668 8,668

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,


4.43 *** FILTRO Y SEPARACIÓN)
M2 ### 6,174 6,174 6,174 6,174 6,174 6,174 6,174

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,


4.44 *** FILTRO Y SEPARACIÓN) M2 ### 9,300 9,300 9,300 9,300 9,300 9,300 9,300

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,


4.45 *** FILTRO Y SEPARACIÓN)
M2 ### 7,584 7,584 7,584 7,584 7,584 7,584 7,584
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, p
4.46 *** FILTRO Y SEPARACIÓN) M2 ### i 9,300 9,300 9,300 9,300 9,300 9,300 9,300
o
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000
4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 17,870 17,870 17,870 17,870 17,870 17,870 17,870

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO


4.48 661.1 Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### 636,268 637,127 636,103 636,494 636,645 636,193 636,419
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
4.49 660.3 DIÁMETRO 600 MM ML ### 365,422 378,318 362,933 368,815 371,078 364,291 367,684
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,
4.50 *** DIÁMETRO 36" ML ### 890,484 890,484 890,484 890,484 890,484 890,484 890,484
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 134,175 183,600 142,413 175,363 157,240 157,240 173,715
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,468 4,468 4,468 4,468 4,468 4,468 4,468

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E


4.53 *** INSTALACIÓN) ML ### 86,701 86,701 86,701 86,701 86,701 86,701 86,701

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E


4.54 *** INSTALACIÓN) ML ### 132,101 132,101 132,101 132,101 132,101 132,101 132,101
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 535,113 598,033 522,971 551,670 562,710 529,594 546,151
4.56 682.1 P COLCHONETA RENO M3 ### 191,466 216,376 188,698 192,850 216,376 188,698 220,528
4.57 *** TRINCHO EN MADERA M2 ### 68,590 68,590 68,590 68,590 68,590 68,590 68,590

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,086 4,086 4,086 4,086 4,086 4,086 4,086
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,800 43,800 43,800 43,800 43,800 43,800 43,800
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 84,568 84,568 84,568 84,568 84,568 84,568 84,568
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 70,346 70,346 70,346 70,346 70,346 70,346 70,346
5.5 730.1 DEFENSA METÁLICA ML ### 149,824 152,801 149,249 150,607 151,129 149,562 150,346
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES UN ### 13,700 13,700 13,700 13,700 13,700 13,700 13,700

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 839 839 839 839 839 839 839
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
6.2 801.6 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UN ### 131,984 131,984 131,984 131,984 131,984 131,984 131,984
UNA DISTANCIA DE 5 KM
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE
6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 25,566 25,566 25,566 25,566 25,566 25,566 25,566
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo
i
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### p 8,310 8,310 8,310 8,310 8,310 8,310 8,310
i
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### o 448,890 448,890 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,587 15,587 15,587 15,587 15,587 15,587 15,587
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 25,234 25,234 25,234 25,234 25,234 25,234 25,234
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,551 9,551 9,551 9,551 9,551 9,551 9,551

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

CONSTRUCCIÓN

2,032,100 2,036,993 2,079,062


1,183,778 1,186,224 1,207,258
14,264 14,264 14,264
15,991 15,991 15,991
18,488 18,488 18,488
66,638 66,638 66,638
46,869 46,922 47,382
21,730 21,784 22,244
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

10,480 10,480 10,480


9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
918,154 917,097 924,683
10,554 10,554 10,554
3,811 3,811 3,811
2,729,348 2,729,348 2,729,348
252,189 252,189 252,189
9,189 9,189 9,189

93,741 74,893 117,728


227,101 232,705 280,917
297,878 297,878 297,878
207,425 207,425 207,425
22,480 22,480 22,480
653,067 658,308 703,376
655,475 660,922 707,764
610,294 615,395 659,256
49,857 49,857 49,857
153,787 153,787 153,787

192,371 192,371 192,371

239,031 239,031 239,031

301,842 301,842 301,842


106,137 106,510 109,716
131,243 131,784 136,430
596,145 601,245 645,107
92,053 92,053 92,053
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

39,012 39,047 39,347


201,587 201,622 201,922
461,681 450,235 490,220
227,906 227,377 234,501
259,281 258,473 269,867
340,468 340,316 357,354
105,276 105,116 105,415
1,305,841 1,304,249 1,307,234
118,725 119,110 122,419
74,858 75,061 76,807
28,328 28,418 29,185
45,636 45,725 46,493
59,921 60,046 61,121
82,026 82,169 83,397
113,476 113,601 114,676
974,837 976,265 988,546

1,379,495 1,382,351 1,406,913

1,799,340 1,805,052 1,854,176

42,861 42,861 42,861


56,624 56,624 56,624
818,275 823,376 867,237
249,999 254,825 292,397
100,238 100,734 104,992

118,259 118,853 123,963

131,574 132,367 139,180

138,834 139,676 146,915


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

159,168 160,208 169,150

177,075 178,263 188,484

196,534 197,871 209,369

100,806 100,881 101,522


968,549 973,649 1,017,511
97,000 97,075 97,716
80,582 81,092 85,478
90,692 91,316 96,682
105,737 106,519 113,247
716,419 721,519 765,381

49,910 50,068 51,424

285,884 288,162 307,751


4,260 4,260 4,260
4,468 4,468 4,468
6,243 6,243 6,243
863,910 869,011 912,872
788,329 793,911 841,913
858,090 863,190 907,052
838,018 843,118 886,980
1,048,696 1,053,797 1,097,659
329,286 334,885 383,030

30,176 30,316 31,519


50,581 50,721 51,924
35,562 35,597 35,896
165,991 166,061 166,660
44,688 44,845 46,201
27,619 27,693 28,335
101,445 101,584 102,782
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

92,600 93,126 97,647


92,707 92,707 92,707
54,277 54,277 54,277
89,260 89,260 89,260
52,553 52,553 52,553
103,651 103,651 103,651
61,071 61,071 61,071
115,347 115,347 115,347
66,919 66,919 66,919
41,652 41,722 42,324
25,140 25,175 25,476
54,152 54,198 54,599
32,455 32,478 32,679
60,874 60,920 61,321
36,489 36,513 36,713
101,904 102,138 104,144
60,031 60,148 61,151
38,072 38,118 38,519
23,017 23,040 23,241
75,845 75,938 76,741
45,584 45,630 46,032
89,781 89,856 90,497
54,229 54,266 54,587
186,861 187,188 189,996
111,824 111,988 113,392
90,889 90,988 91,835
54,783 54,832 55,256
48,159 48,263 49,162
29,178 29,230 29,679
34,508 34,554 34,956
20,960 20,983 21,184
52,358 52,451 53,254
31,960 32,007 32,408
100,865 101,004 102,208
61,180 61,250 61,852
73,575 73,668 74,470
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

44,283 44,330 44,731


155,407 155,734 158,543
94,116 94,279 95,684
32,382 32,417 32,716
36,585 36,656 37,265
61,913 62,007 62,820
5,260 5,260 5,260
50,946 51,086 52,289
10,631 10,631 10,631
14,056 14,056 14,056
18,371 18,371 18,371
25,732 25,732 25,732
38,390 38,390 38,390
4,999 5,037 5,364

16,223 16,223 16,223


5,953 5,988 6,287
7,139 7,174 7,473
8,436 8,471 8,770
6,931 6,931 6,931
13,793 13,793 13,793
24,069 24,138 24,732
14,629 14,663 14,960
21,745 21,843 22,686
13,156 13,205 13,627
20,178 20,247 20,841
12,373 12,408 12,704
21,745 21,843 22,686
13,156 13,205 13,627
21,544 21,593 22,016
13,055 13,079 13,291
18,050 18,125 18,767
11,020 11,058 11,379
16,856 16,909 17,361
10,424 10,450 10,676
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

22,523 22,621 23,464


13,525 13,574 13,996
20,957 21,026 21,619
12,742 12,777 13,073
17,467 17,519 17,971
10,711 10,737 10,963
21,846 21,915 22,508
13,591 13,626 13,922

27,729 27,869 29,073


84,596 84,859 87,119
56,282 56,282 56,282
22,429 22,429 22,429
35,220 35,220 35,220
82,240 82,240 82,240
64,402 64,402 64,402
37,460 37,460 37,460
86,191 86,191 86,191
102,919 102,919 102,919
151,248 151,248 151,248
59,755 59,755 59,755
83,027 83,027 83,027
75,484 75,484 75,484
133,968 133,968 133,968
78,240 78,240 78,240
57,477 57,477 57,477
32,749 32,749 32,749
60,913 61,087 62,584
47,915 47,915 47,915
43,927 43,927 43,927
37,065 37,065 37,065
36,292 36,292 36,292
36,565 36,565 36,565
51,455 51,455 51,455
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

45,241 45,241 45,241


82,781 82,781 82,781

152,835 152,835 152,835

68,714 68,714 68,714


43,101 43,101 43,101
33,768 33,768 33,768
58,877 58,877 58,877
20,264 20,264 20,264
24,377 24,377 24,377
26,410 26,410 26,410
34,002 34,002 34,002
22,450 22,450 22,450
52,853 52,853 52,853
362,102 362,102 362,102
413,890 413,890 413,890
275,159 275,159 275,159
293,982 293,982 293,982

464,562 469,964 516,425


405,658 410,610 453,194
403,458 408,546 452,302
359,563 364,820 410,025
335,397 340,747 386,749
304,584 310,020 356,763
266,414 271,218 312,542
479,613 484,278 524,404
405,017 408,300 436,545
468,170 471,241 497,657
698,010 701,081 727,497

125,134 125,134 125,134


4,197 4,232 4,531
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

140,017 140,017 140,017


171,480 171,480 171,480
249,310 249,310 249,310
277,490 277,490 277,490
305,703 305,703 305,703
203,024 203,024 203,024
230,166 230,166 230,166
338,732 338,732 338,732
128,384 128,384 128,384
170,454 170,454 170,454
189,453 189,453 189,453
482,584 482,584 482,584
42,755 42,755 42,755
26,622 26,622 26,622
101,075 101,075 101,075
123,447 123,447 123,447
95,898 95,898 95,898
29,727 29,727 29,727
29,727 29,727 29,727
28,180 28,180 28,180
43,096 43,096 43,096
53,377 53,377 53,377
64,341 64,341 64,341
77,363 77,363 77,363
364,453 364,453 364,453
254,802 254,802 254,802
34,187 34,187 34,187
43,782 43,782 43,782
53,377 53,377 53,377
67,083 67,083 67,083

77,286 77,286 77,286


215,118 215,118 215,118
81,806 81,806 81,806
146,346 146,346 146,346
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

138,693 138,693 138,693


91,058 91,058 91,058
214,637 214,637 214,637
111,787 111,787 111,787
6,705 6,705 6,705
100,897 100,897 100,897

122,945 122,945 122,945


41,546 41,546 41,546
548,571 548,571 548,571
197,244 197,244 197,244

221,272 221,272 221,272

500,133 500,133 500,133

130,249 130,249 130,249

400,080 400,080 400,080


6,126 6,126 6,126
281,315 281,315 281,315
124,009 124,009 124,009
87,611 87,611 87,611
90,424 90,424 90,424

10,721 10,721 10,721

11,897 11,897 11,897


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

9,454 9,454 9,454

224,227 224,227 224,227


270,535 270,535 270,535
22,429 22,429 22,429
35,220 35,220 35,220
33,780 33,780 33,780
43,315 43,315 43,315
89,329 89,329 89,329
225,613 225,613 225,613
44,308 44,308 44,308
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
35,550 35,550 35,550
67,571 67,571 67,571
100,988 100,988 100,988
85,277 85,277 85,277
62,153 62,153 62,153
66,125 66,125 66,125
83,560 83,560 83,560
67,383 67,383 67,383
84,336 84,336 84,336
90,212 90,212 90,212
74,807 74,807 74,807
12,674 12,674 12,674
17,849 17,849 17,849
23,303 23,303 23,303
14,392 14,392 14,392
8,596 8,596 8,596
51,919 51,919 51,919
33,209 33,209 33,209
10,765 10,765 10,765
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

25,648 25,648 25,648


35,587 35,587 35,587
48,295 48,295 48,295
90,305 90,305 90,305
109,646 109,646 109,646
61,121 61,121 61,121
77,840 77,840 77,840
188,086 188,086 188,086
387,950 387,950 387,950
286,597 286,597 286,597
17,878 17,878 17,878
22,565 22,565 22,565

175,524 175,524 175,524

285,783 285,783 285,783

475,629 475,629 475,629

41,132 41,132 41,132

48,505 48,505 48,505

62,210 62,210 62,210

70,571 70,571 70,571

90,946 90,946 90,946

105,257 105,257 105,257

155,647 155,647 155,647

62,696 62,696 62,696


62,953 62,953 62,953
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

40,617 40,617 40,617


50,062 50,062 50,062

4,243 4,243 4,243

6,688 6,688 6,688

1,033,105 1,033,105 1,033,105


789,101 789,101 789,101
2,654,227 2,654,227 2,654,227
2,212,816 2,212,816 2,212,816
642,158 642,158 642,158
831,065 831,065 831,065
320,069 320,069 320,069

369,823 369,823 369,823


58,763 58,763 58,763
69,567 69,567 69,567
77,230 77,230 77,230
90,965 90,965 90,965
55,243 55,243 55,243
62,963 62,963 62,963
145,341 145,341 145,341
56,727 56,727 56,727
130,370 130,370 130,370
77,955 77,955 77,955
46,232 46,232 46,232
97,429 97,429 97,429
415,993 415,993 415,993
554,121 554,121 554,121
3,588 3,588 3,588
4,738 4,738 4,738
7,372 7,372 7,372
13,185 13,185 13,185
277,059 277,059 277,059
78,271 78,271 78,271
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

105,980 105,980 105,980


43,214 43,214 43,214
1,420,020 1,420,020 1,420,020
1,052,341 1,052,341 1,052,341
1,316,549 1,316,549 1,316,549
612,714 612,714 612,714
111,818 111,818 111,818
514,087 514,087 514,087
643,181 643,181 643,181
1,698,893 1,698,893 1,698,893
1,251,057 1,251,057 1,251,057

39,752 39,871 40,887


39,502 39,620 40,636
14,786 14,810 15,013
27,304 27,540 29,572
85,385 85,621 87,653
26,997 27,104 28,024
58,743 59,269 63,789
81,562 82,403 89,636
30,943 30,943 30,943
23,371 23,371 23,371
27,419 27,419 27,419
47,848 48,322 52,390
56,081 56,660 61,632
81,344 82,238 89,923
103,879 107,721 140,767
107,479 104,253 143,211

58,090 58,138 58,544

34,717 34,741 34,944

66,078 66,196 67,212


69,478 69,596 70,612
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

73,809 73,927 74,943


76,712 76,759 77,165
37,592 37,651 38,162
166,448 166,660 168,489
46,743 46,885 48,109
44,626 44,626 44,626
10,232 10,291 10,802
9,597 9,597 9,597
12,885 12,885 12,885
10,744 10,744 10,744
18,011 18,011 18,011
35,110 35,110 35,110
9,381 9,381 9,381
75,959 75,959 75,959
120,129 120,294 121,717
7,664 7,664 7,664
32,948 33,018 33,617
46,926 46,926 46,926
54,546 54,546 54,546
50,191 50,191 50,191
50,349 50,396 50,802
56,555 56,603 57,009
11,149 11,149 11,149
51,089 51,193 52,092
21,077 21,077 21,077
126,174 126,174 126,174
10,133 10,133 10,133
23,000 23,000 23,000
14,747 14,747 14,747
14,327 14,327 14,327
8,704 8,704 8,704
8,857 8,857 8,857
19,482 19,482 19,482
17,753 17,753 17,753
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

19,135 19,135 19,135

22,120 22,120 22,120


66,483 66,530 66,937
79,317 79,317 79,317
34,692 34,692 34,692
13,554 13,554 13,554
104,221 104,221 104,221
126,107 126,107 126,107

74,518 74,518 74,518


36,595 36,595 36,595
56,610 56,610 56,610
69,490 69,490 69,490
51,856 51,856 51,856
96,198 96,198 96,198
50,025 50,025 50,025
106,355 106,355 106,355
13,695 13,695 13,695

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
43,707 43,707 43,707

49,987 49,987 49,987

85,005 85,005 85,005

19,114 19,114 19,114

94,217 66,802 118,204


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

106,875 110,802 144,575


199,695 230,536 264,804
83,647 64,799 107,634
168,861 199,702 233,970
196,664 227,505 261,773

308,940 308,940 308,940

911,043 911,043 911,043

493,560 493,560 493,560

142,933 142,933 142,933

200,237 200,237 200,237

185,946 185,946 185,946

409,556 409,556 409,556

1,047,756 1,047,756 1,047,756

297,461 297,461 297,461

210,652 210,652 210,652


83,720 83,720 83,720
255,119 255,119 255,119

375,900 375,900 375,900

8,480 8,480 8,480


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

3,146 3,146 3,146


11,284 11,284 11,284
42,981 42,981 42,981
5,916 5,916 5,916
67,173 67,173 67,173
3,516 3,516 3,516
2,822 2,822 2,822
14,155 14,155 14,155
4,102 4,102 4,102
14,926 14,926 14,926
5,854 5,854 5,854
6,659 6,659 6,659
7,110 7,110 7,110
4,450 4,450 4,450
15,751 15,751 15,751
9,754 9,754 9,754
23,062 23,062 23,062
2,725 2,725 2,725
12,401 12,401 12,401
3,345 3,345 3,345
12,794 12,794 12,794
7,192 7,192 7,192
4,516 4,516 4,516
22,202 22,202 22,202
12,861 12,861 12,861
7,940 7,940 7,940

6,205,579 6,205,579 6,205,579


10,964,286 10,964,286 10,964,286
2,869,340 2,869,340 2,869,340
9,377,256 9,377,256 9,377,256
8,781,690 8,781,690 8,781,690
2,725 2,725 2,725
880,441 880,441 880,441
87,999 87,999 87,999
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

1,593,616 1,593,670 1,594,134


690,151 691,423 702,362

29,860 29,860 29,860


44,436 44,436 44,436
55,115 55,115 55,115

17,910 17,910 17,910

21,715 21,715 21,715

29,630 29,630 29,630

26,429 26,429 26,429


27,867 27,867 27,867
34,870 34,870 34,870
17,998 17,998 17,998
23,602 23,602 23,602
36,325 36,325 36,325
278,697 278,697 278,697
320,783 320,783 320,783
334,519 334,519 334,519
310,170 310,170 310,170

226,448 226,448 226,448


34,736 34,736 34,736
105,628 105,628 105,628
267,539 267,539 267,539
52,959 52,959 52,959
585,066 585,066 585,066
1,452,240 1,452,240 1,452,240
45,262 45,262 45,262
226,593 226,593 226,593
44,714 44,714 44,714
3,836 3,836 3,836
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

6,454 6,454 6,454


18,872 18,872 18,872
24,746 24,746 24,746
32,142 32,142 32,142
125,378 125,378 125,378
32,706 32,706 32,706
107,030 107,030 107,030
186,761 186,761 186,761
293,971 293,971 293,971
364,959 364,959 364,959
398,886 398,886 398,886
583,489 583,489 583,489
343,530 343,530 343,530
106,259 106,259 106,259
14,163 14,163 14,163
28,955 28,955 28,955
5,093 5,093 5,093
35,848 35,848 35,848
37,466 37,466 37,466
38,273 38,273 38,273
24,962 24,962 24,962
27,622 27,622 27,622
28,739 28,739 28,739
48,385 48,385 48,385
626,457 626,457 626,457
321,581 321,581 321,581
89,988 89,988 89,988
1,869 1,869 1,869
8,630 8,630 8,630
12,883 12,883 12,883
21,513 21,513 21,513
3,982 3,982 3,982
22,602 22,602 22,602
32,922 32,922 32,922
19,660 19,660 19,660
15,655 15,655 15,655
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

632,723 632,723 632,723


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

URBANISMO

9,712 9,712 9,712


92,611 92,611 92,611
521,652 521,652 521,652
1,113,416 1,113,416 1,113,416
127,628 127,628 127,628
777,523 777,523 777,523
1,673,343 1,673,343 1,673,343
13,332 13,332 13,332
16,449 16,449 16,449
20,661 20,661 20,661
22,615 22,615 22,615
27,116 27,116 27,116
27,116 27,116 27,116
109,083 109,083 109,083
126,349 126,349 126,349
391,025 391,025 391,025
146,837 146,837 146,837
242,060 242,060 242,060
1,071,196 1,071,196 1,071,196
1,234,182 1,234,182 1,234,182
14,469 14,469 14,469
12,766 12,766 12,766
31,551 31,551 31,551
125,145 125,145 125,145
186,374 186,374 186,374
30,451 30,451 30,451
104,908 104,908 104,908
155,473 155,473 155,473
30,779 30,779 30,779
63,468 63,468 63,468
255,654 255,654 255,654
74,053 74,053 74,053
297,453 297,453 297,453
178,297 178,297 178,297
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

507,607 507,607 507,607


1,359,804 1,359,804 1,359,804
2,009,272 2,009,272 2,009,272

10,882 10,882 10,882


24,861 24,861 24,861
19,114 19,114 19,114
91,276 95,193 128,880
89,182 61,768 113,170
88,707 69,859 112,694
106,077 110,176 135,797
56,037 60,216 86,334
114,671 119,197 158,125

116,610 116,610 116,610


1,215,957 1,215,957 1,215,957
152,396 152,396 152,396
1,408,391 1,408,391 1,408,391
981,623 981,623 981,623
62,873 62,873 62,873
115,757 115,757 115,757
273,358 273,358 273,358
273,351 273,351 273,351
438,867 438,867 438,867
115,806 115,806 115,806
115,806 115,806 115,806
273,358 273,358 273,358
273,358 273,358 273,358
438,867 438,867 438,867
440,630 440,630 440,630
715,521 715,521 715,521
1,148,394 1,148,394 1,148,394
70,958 70,958 70,958
368,704 368,704 368,704
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

413,420 413,420 413,420


1,144,263 1,144,263 1,144,263
67,106 67,152 67,554
334,237 334,237 334,237
50,862 50,862 50,862
71,940 71,940 71,940
103,822 103,822 103,822
159,372 159,372 159,372
256,147 256,147 256,147
371,659 371,659 371,659
470,328 470,328 470,328
618,405 618,405 618,405
850,646 850,646 850,646

678,289 681,342 707,596

648,851 650,356 663,300

722,768 724,803 742,306

805,828 809,644 842,461

922,119 924,238 942,465

834,669 837,467 861,533


1,000,740 1,002,142 1,014,203
1,452,762 1,456,935 1,492,847
1,997,477 2,005,600 2,075,457
2,652,490 2,665,994 2,782,114
1,860,310 1,860,310 1,860,310
3,936,598 3,936,598 3,936,598
139,576 139,637 140,166
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

75,161 75,404 77,500


88,889 89,132 91,228
56,806 57,358 62,104
61,415 61,949 66,543
61,646 62,166 66,637
257,043 257,105 257,633
18,557 18,623 19,193
40,634 41,023 44,368
84,208 84,241 84,524
558,325 559,282 567,509
62,328 62,469 63,678
90,983 91,123 92,332
33,743 33,956 35,794

54,360 54,792 58,512


107,002 110,616 114,879
60,350 60,435 61,167

205,575 205,829 208,017


675,472 675,828 678,891
217,382 217,436 217,896
163,885 164,191 166,816
165,753 166,058 168,684
194,435 194,756 197,516
60,060 60,246 61,851
69,667 69,876 71,673
316,105 316,151 316,553
833,098 833,251 834,563
3,420,047 3,420,148 3,421,024
3,518,278 3,518,379 3,519,255
491,855 491,962 492,882
651,716 652,144 655,824
541,109 541,109 541,109
250,652 250,805 252,118
583,050 583,167 584,170
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

6,501,576 6,502,339 6,508,903

4,086 4,086 4,086


43,800 43,800 43,800
317,053 317,084 317,348
499,756 499,970 501,810
236,900 236,930 237,194
251,638 251,668 251,932
262,799 262,829 263,093
13,700 13,700 13,700
14,632 14,632 14,632
119,151 119,151 119,151
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

ECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548

35,493 35,493 35,493

8,749 8,749 8,749


14,967 14,967 14,967
13,068 13,068 13,068
7,499 7,499 7,499
481 481 481

12,832 12,832 12,832

20,948 20,948 20,948

65,185 65,185 65,185

79,958 79,958 79,958

19,035 19,035 19,035


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

39,738 39,738 39,738

31,203 31,203 31,203

53,644 53,644 53,644

5,366 5,366 5,366


168,861 199,702 233,970
196,664 227,505 261,773
139,125 139,125 139,125
3,251 3,251 3,251
1,127 1,127 1,127
227,596 228,659 237,803
65,822 66,053 68,037
657,184 617,644 647,299

663,134 623,594 653,249

700,037 660,497 690,152

692,884 653,344 682,999


413,303 416,676 422,635
346,222 377,063 411,331
317,238 348,079 382,347
38,791 38,791 38,791
172,413 172,413 172,413
83,647 64,799 107,634
11,838 11,913 12,554
4,774 4,811 5,132
643,276 648,167 690,233

675,833 680,944 724,893


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

697,538 702,797 748,016

7,079 7,079 7,079


83,946 89,745 125,990

918,339 923,887 971,604


791,973 797,429 844,355
838,392 844,064 892,848
573,449 578,451 621,461
669,753 674,953 719,666
571,227 576,366 620,560
667,443 672,785 718,729
730,258 735,397 779,591
590,733 596,075 642,019
774,233 779,575 825,519
11,944 11,944 11,944

15,338 15,338 15,338


1,802 1,802 1,802
2,707,971 2,707,971 2,707,971

4,135,879 4,145,370 4,226,991

1,724,885 1,729,973 1,773,729


87,951 87,951 87,951
361,965 362,576 367,826
425,538 425,538 425,538
17,072 17,072 17,072
494,668 488,484 561,405
122,411 128,211 164,456
93,037 67,732 115,180
384,469 389,873 436,335
BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

361,903 367,221 408,003


370,546 375,864 416,646
376,402 381,665 421,968
385,045 390,308 430,611
521,157 526,466 572,123
615,617 621,136 668,602
172,741 178,276 212,874
176,948 182,483 217,081
42,545 42,871 45,673

16,457 16,620 18,021

10,197 10,197 10,197

14,540 14,540 14,540

19,569 19,569 19,569

23,458 23,458 23,458

30,144 30,144 30,144

7,318 7,318 7,318

8,339 8,339 8,339

8,668 8,668 8,668

6,174 6,174 6,174

9,300 9,300 9,300

7,584 7,584 7,584


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

9,300 9,300 9,300

17,870 17,870 17,870

636,208 636,283 636,931

364,517 365,648 375,377

890,484 890,484 890,484


152,298 134,175 175,363
4,468 4,468 4,468

86,701 86,701 86,701

132,101 132,101 132,101


530,698 536,217 583,683
188,698 194,234 228,831
68,590 68,590 68,590

4,086 4,086 4,086


43,800 43,800 43,800
84,568 84,568 84,568
70,346 70,346 70,346
149,615 149,876 152,122
13,700 13,700 13,700

839 839 839

131,984 131,984 131,984

25,566 25,566 25,566


BERNACIÓN DE CUNDINAMARCA
S CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: SUMAPAZ
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

Silvanía Tibacuy Venecia

8,310 8,310 8,310


448,890 448,890 448,890

1,804 1,804 1,804


15,587 15,587 15,587
25,234 25,234 25,234
9,551 9,551 9,551

E BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
p CONSTRUCCIÓN
i
1 PRELIMINARES o
1.1 CAMPAMENTO 18 M2 UN ### 2,027,566 2,036,962 2,007,991 2,034,613 2,043,226 2,014,795 2,034,613
1.2 CAMPAMENTO 9 M2 UN ### 1,180,598 1,185,296 1,170,811 1,184,122 1,188,428 1,174,213 1,184,122
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,162 14,162 14,162 14,162 14,162 14,162 14,162
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 15,876 15,876 15,876 15,876 15,876 15,876 15,876
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,360 18,360 18,360 18,360 18,360 18,360 18,360
1.6 CERCA EN TABLA H=2.30 M ML ### 65,829 65,829 65,829 65,829 65,829 65,829 65,829
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,418 46,506 46,235 46,484 46,564 46,330 46,484
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,607 21,695 21,424 21,673 21,753 21,520 21,673
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2### p 10,480 10,480 10,480 10,480 10,480 10,480 10,480
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2### i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
1.37 DESMONTE MUROS SECOS M2### o 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 908,595 909,969 905,275 909,053 911,051 908,715 909,750
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2### 10,434 10,434 10,434 10,434 10,434 10,434 10,434
1.42 REPLANTEO MANUAL DE CIMIENTOS M2### 3,763 3,763 3,763 3,763 3,763 3,763 3,763
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,693,416 2,693,416 2,693,416 2,693,416 2,693,416 2,693,416 2,693,416
1.44 RED TELEFÓNICA PROVISIONAL UN ### 249,178 249,178 249,178 249,178 249,178 249,178 249,178
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE) M3### 9,189 9,189 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3### 114,774 123,341 89,073 111,347 131,908 131,908 140,475
2.2 BASE ARENA CEMENTO 1:20 M3### 186,188 186,188 186,188 186,188 186,188 175,111 186,188
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2### 22,207 22,207 22,207 22,207 22,207 22,207 22,207
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3### 659,025 668,058 640,207 665,800 674,079 648,929 665,800
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3### 658,204 666,932 640,021 664,750 672,750 650,000 664,750
2.8 ZAPATAS EN CONCRETO 3500 PSI M3### 613,121 621,294 596,095 619,251 626,742 605,439 619,251
2.9 PILOTE DE MADERA D=20 CM ML ### 49,721 49,721 49,721 49,721 49,721 49,721 49,721
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM) ML ### 153,347 153,347 153,347 153,347 153,347 153,347 153,347
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2.11 UNA DISTANCIA MENOR DE 5 KM) ML ### 191,390 191,390 191,390 191,390 191,390 191,390 191,390
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2.12 UNA DISTANCIA MENOR DE 5 KM)
ML ### 237,396 237,396 237,396 237,396 237,396 237,396 237,396
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2.13 UNA DISTANCIA MENOR DE 5 KM) ML ### 299,327 299,327 299,327 299,327 299,327 299,327 299,327
2.14 PILOTE HINCADO 25X25 ML ### 105,652 106,185 104,541 106,051 106,540 105,313 106,051
2.15 PILOTE HINCADO 30X30 ML ### 130,540 131,312 128,930 131,119 131,827 130,049 131,119
2.16 DADOS EN CONCRETO 3500PSI M3### 598,972 607,145 581,946 605,101 612,593 591,290 605,101
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM) ML ### 91,763 91,763 91,763 91,763 91,763 91,763 91,763
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS p
3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### i 38,382 38,382 38,382 38,382 38,382 38,313 38,382
3.2 SIFÓN EN PVC 6" UN ### o 198,627 198,627 198,627 198,627 198,627 198,558 198,627
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 474,186 481,134 455,926 474,648 487,142 476,508 480,429
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 229,910 231,406 226,472 230,632 232,520 228,272 231,119
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 262,820 265,038 257,699 263,854 266,699 260,352 264,620
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 346,129 349,495 338,615 348,024 351,921 341,180 348,790
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 104,939 104,989 104,790 104,919 105,039 105,039 104,989
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,288,965 1,289,462 1,287,472 1,288,766 1,289,960 1,289,960 1,289,462
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 114,933 114,933 114,933 114,933 114,933 114,173 114,933
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 72,614 72,614 72,614 72,614 72,614 72,213 72,614
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,883 29,144 28,339 29,079 29,318 28,339 29,079
3.12 TUBERÍA DRENAJE PVC 160 ML ### 45,948 46,209 45,404 46,144 46,383 45,404 46,144
3.13 TUBERÍA DRENAJE PVC 200 ML ### 60,373 60,739 59,612 60,647 60,982 59,612 60,647
3.14 TUBERÍA DRENAJE PVC 250 ML ### 82,328 82,746 81,458 82,641 83,024 81,458 82,641
3.15 TUBERÍA DRENAJE PVC 315 ML ### 113,142 113,507 112,380 113,416 113,751 112,380 113,416
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3.16 MATERIAL FILTRANTE) UN ### 975,092 979,268 966,392 978,224 982,052 966,392 978,224
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3.17 MATERIAL FILTRANTE) UN ### 1,387,115 1,395,467 1,369,715 1,393,379 1,401,035 1,369,715 1,393,379
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3.18 MATERIAL FILTRANTE) UN ### 1,827,493 1,844,197 1,792,693 1,840,021 1,855,333 1,792,693 1,840,021

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2### 42,356 42,356 42,356 42,356 42,356 42,356 42,356
4.2 CASETÓN DE LONA 0.80X0.70 M2### 55,913 55,913 55,913 55,913 55,913 55,913 55,913
4.3 COLUMNAS 3500 PSI M3### 819,657 827,831 802,632 825,787 833,278 811,976 825,787
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3### 260,447 283,949 248,049 282,462 280,812 263,033 277,447
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4.5 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2### 99,879 100,673 98,226 100,475 101,202 99,134 100,475
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.
4.6 MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2### 117,811 118,763 115,828 118,525 119,398 116,916 118,525
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO) M2### 131,722 132,991 129,077 132,674 133,838 130,529 132,674
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN
4.8 REFUERZO) M2### 138,993 140,342 136,183 140,004 141,241 137,725 140,004
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN
4.9 REFUERZO)
M2### 159,417 161,083 155,945 160,666 162,194 157,850 160,666
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
M2### p 177,380
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN
4.10 REFUERZO) 179,284 173,413 178,808 180,554 175,590 178,808
i
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN o
4.11 REFUERZO) M2### 196,901 199,043 192,438 198,508 200,471 194,887 198,508
4.12 ENTREPISO VIGUETA PLACA M2### 99,805 99,893 99,623 99,871 99,951 99,658 99,871
4.13 ESCALERA MACIZA 3500 PSI M3### 968,084 976,257 951,058 974,214 981,705 960,403 974,214
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2### 95,228 95,228 95,228 95,228 95,228 95,530 95,228
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2### 80,694 81,511 78,991 81,307 82,056 79,926 81,307
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2### 90,873 91,873 88,791 91,623 92,540 89,934 91,623
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2### 106,013 107,267 103,401 106,953 108,102 104,835 106,953
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3### 718,789 726,962 701,763 724,919 732,410 711,108 724,919
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4.19 M) UN ### 49,706 49,932 49,236 49,875 50,082 49,563 49,875
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2### 287,151 290,801 279,547 289,888 293,234 283,720 289,888
4.21 ACERO FIGURADO 37000 PSI KG ### 4,205 4,205 4,205 4,205 4,205 4,205 4,205
4.22 ACERO FIGURADO 60000 PSI KG ### 4,410 4,410 4,410 4,410 4,410 4,410 4,410
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,185 6,185 6,185 6,185 6,185 6,185 6,185
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3### 865,899 874,073 848,874 872,029 879,520 858,218 872,029
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3### 791,291 800,253 772,621 798,012 806,227 782,822 798,012
4.26 VIGA AÉREA 3500 PSI M3### 859,894 868,067 842,869 866,024 873,515 852,213 866,024
4.27 VIGA CINTA 3500 PSI M3### 839,816 847,989 822,790 845,946 853,437 832,134 845,946
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3### 1,050,348 1,058,521 1,033,322 1,056,477 1,063,968 1,042,666 1,056,477
4.29 BASE EN CONCRETO POBRE 1500 PSI M3### 345,032 355,785 322,630 353,097 362,954 330,417 353,097

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,843 29,993 29,529 29,955 30,093 29,678 29,955
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 50,229 50,380 49,916 50,342 50,480 50,065 50,342
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,100 35,100 35,100 35,100 35,100 35,031 35,100
5.4 ARCOS EN LADRILLO PRENSADO ML ### 164,442 164,442 164,442 164,442 164,442 164,304 164,442
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,494 44,719 44,024 44,663 44,870 44,350 44,663
5.6 DINTELES EN BLOQUE 0.15 M ML ### 26,832 26,832 26,832 26,832 26,832 27,134 26,832
5.7 ENCHAPES LADRILLO PRENSADO M2### 99,299 99,299 99,299 99,299 99,299 99,024 99,299
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2### 91,984 92,735 90,418 92,547 93,236 91,506 92,547
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2### 91,843 91,843 91,843 91,843 91,843 91,843 91,843
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 53,845 53,845 53,845 53,845 53,845 53,845 53,845
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2### 88,447 88,447 88,447 88,447 88,447 88,447 88,447
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,147 52,147 52,147 52,147 52,147 52,147 52,147
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2### p 102,566 102,566 102,566 102,566 102,566 102,566 102,566
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### i 60,528 60,528 60,528 60,528 60,528 60,528 60,528
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2### o 114,087 114,087 114,087 114,087 114,087 114,087 114,087
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,289 66,289 66,289 66,289 66,289 66,289 66,289
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2### 40,792 40,792 40,792 40,792 40,792 40,654 40,792
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,710 24,710 24,710 24,710 24,710 24,641 24,710
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2### 53,250 53,250 53,250 53,250 53,250 53,158 53,250
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,005 32,005 32,005 32,005 32,005 31,958 32,005
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2### 59,906 59,906 59,906 59,906 59,906 59,814 59,906
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,006 36,006 36,006 36,006 36,006 35,960 36,006
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2### 99,237 99,237 99,237 99,237 99,237 98,776 99,237
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,698 58,698 58,698 58,698 58,698 58,467 58,698
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2### 37,418 37,418 37,418 37,418 37,418 37,326 37,418
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,690 22,690 22,690 22,690 22,690 22,644 22,690
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2### 74,465 74,465 74,465 74,465 74,465 74,280 74,465
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 44,894 44,894 44,894 44,894 44,894 44,801 44,894
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2### 88,161 88,161 88,161 88,161 88,161 88,464 88,161
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,419 53,419 53,419 53,419 53,419 53,570 53,419
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2### 182,469 182,469 182,469 182,469 182,469 181,824 182,469
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 109,628 109,628 109,628 109,628 109,628 109,306 109,628
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2### 89,874 89,874 89,874 89,874 89,874 89,670 89,874
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,275 54,275 54,275 54,275 54,275 54,174 54,275
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2### 46,976 46,976 46,976 46,976 46,976 46,770 46,976
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 28,587 28,587 28,587 28,587 28,587 28,483 28,587
5.37 MURO TOLETE COMÚN 0.06 M M2### 33,893 33,893 33,893 33,893 33,893 33,800 33,893
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,652 20,652 20,652 20,652 20,652 20,606 20,652
5.39 MURO TOLETE COMÚN 0.12 M M2### 51,177 51,177 51,177 51,177 51,177 50,993 51,177
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,370 31,370 31,370 31,370 31,370 31,277 31,370
5.41 MURO TOLETE COMÚN 0.25 M M2### 98,810 98,810 98,810 98,810 98,810 98,533 98,810
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,153 60,153 60,153 60,153 60,153 60,015 60,153
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2### 72,132 72,132 72,132 72,132 72,132 71,948 72,132

5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,553 43,553 43,553 43,553 43,553 43,461 43,553

5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2### 151,410 151,410 151,410 151,410 151,410 150,765 151,410
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 92,105 92,105 92,105 92,105 92,105 91,782 92,105
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
5.47 REMATES LADRILLO PRENSADO ML ### p 31,868 31,868 31,868 31,868 31,868 31,799 31,868
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### i 36,249 36,249 36,249 36,249 36,249 36,103 36,249
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### o 61,354 61,354 61,354 61,354 61,354 61,159 61,354
5.50 LAVADA DE FACHADA M2### 5,250 5,250 5,250 5,250 5,250 5,250 5,250
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### 50,591 50,742 50,278 50,704 50,842 50,427 50,704
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,613 10,613 10,613 10,613 10,613 10,613 10,613
5.53 ANCLAJE 3/8" L=30CM UN ### 14,001 14,001 14,001 14,001 14,001 14,001 14,001
5.54 ANCLAJE 1/2" L=50CM UN ### 18,290 18,290 18,290 18,290 18,290 18,290 18,290
5.55 ANCLAJE 5/8" L=70CM UN ### 25,567 25,567 25,567 25,567 25,567 25,567 25,567
5.56 ANCLAJE 3/4" L=70CM UN ### 38,074 38,074 38,074 38,074 38,074 38,074 38,074
5.57 ANCLAJE 1" L= 70CM UN ### 5,051 5,117 4,915 5,100 5,160 4,978 5,100

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2### 16,172 16,172 16,172 16,172 16,172 16,172 16,172
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,692 5,692 5,692 5,692 5,692 5,623 5,692
6.3 FILOS O DILATACIONES S/MURO ML ### 6,878 6,878 6,878 6,878 6,878 6,809 6,878
6.4 GOTERA EN MORTERO 1:4 ML ### 8,161 8,161 8,161 8,161 8,161 8,093 8,161
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2### 6,863 6,863 6,863 6,863 6,863 6,863 6,863
6.6 MALLA BAJO ENTRAMADO M2### 13,726 13,726 13,726 13,726 13,726 13,726 13,726
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2### 23,978 23,978 23,978 23,978 23,978 23,836 23,978
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,583 14,583 14,583 14,583 14,583 14,512 14,583
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2### 20,967 20,967 20,967 20,967 20,967 20,774 20,967
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,768 12,768 12,768 12,768 12,768 12,671 12,768
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2### 20,087 20,087 20,087 20,087 20,087 19,945 20,087
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,327 12,327 12,327 12,327 12,327 12,256 12,327
6.13 PAÑETE CULATAS 1:4, E=2 CM M2### 20,967 20,967 20,967 20,967 20,967 20,774 20,967
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,768 12,768 12,768 12,768 12,768 12,671 12,768
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2### 21,406 21,406 21,406 21,406 21,406 21,304 21,406
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 12,986 12,986 12,986 12,986 12,986 12,935 12,986
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2### 17,457 17,457 17,457 17,457 17,457 17,310 17,457
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,724 10,724 10,724 10,724 10,724 10,650 10,724
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2### 16,787 16,787 16,787 16,787 16,787 16,678 16,787
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,389 10,389 10,389 10,389 10,389 10,335 10,389
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2### 21,746 21,746 21,746 21,746 21,746 21,552 21,746
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,137 13,137 13,137 13,137 13,137 13,040 13,137
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2### 20,865 20,865 20,865 20,865 20,865 20,723 20,865
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,697 12,697 12,697 12,697 12,697 12,625 12,697
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2### p 17,397 17,397 17,397 17,397 17,397 17,289 17,397
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### i 10,676 10,676 10,676 10,676 10,676 10,622 10,676
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2### o 21,755 21,755 21,755 21,755 21,755 21,612 21,755
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,545 13,545 13,545 13,545 13,545 13,474 13,545

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2### 26,618 26,618 26,618 26,618 26,618 26,342 26,618
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE)
M2### 83,827 84,203 83,044 84,109 84,454 83,589 84,109
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 55,598 55,598 55,598 55,598 55,598 55,598 55,598
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,216 22,216 22,216 22,216 22,216 22,216 22,216
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,865 34,865 34,865 34,865 34,865 34,865 34,865
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 81,189 81,189 81,189 81,189 81,189 81,189 81,189
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 63,615 63,615 63,615 63,615 63,615 63,615 63,615
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,076 37,076 37,076 37,076 37,076 37,076 37,076
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 85,081 85,081 85,081 85,081 85,081 85,081 85,081
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 101,558 101,558 101,558 101,558 101,558 101,558 101,558
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 149,166 149,166 149,166 149,166 149,166 149,166 149,166
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 59,063 59,063 59,063 59,063 59,063 59,063 59,063
7.13 CANAL PVC AMAZONAS ML ### 82,139 82,139 82,139 82,139 82,139 82,139 82,139
7.14 CANAL PVC RAINGO ML ### 74,707 74,707 74,707 74,707 74,707 74,707 74,707
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2### 132,281 132,281 132,281 132,281 132,281 132,281 132,281
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2### 77,213 77,213 77,213 77,213 77,213 77,213 77,213
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2### 56,759 56,759 56,759 56,759 56,759 56,759 56,759
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,484 32,484 32,484 32,484 32,484 32,484 32,484
7.19 TEJA DE BARRO M2### 59,242 59,242 59,242 59,242 59,242 58,898 59,242
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2### 47,311 47,311 47,311 47,311 47,311 47,311 47,311
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2### 43,383 43,383 43,383 43,383 43,383 43,383 43,383
7.22 TEJA FIBROCEMENTO Nº4 M2### 36,711 36,711 36,711 36,711 36,711 36,711 36,711
7.23 TEJA FIBROCEMENTO No. 6 M2### 35,936 35,936 35,936 35,936 35,936 35,936 35,936
7.24 TEJA FIBROCEMENTO No. 8 M2### 36,206 36,206 36,206 36,206 36,206 36,206 36,206
7.25 TEJA TERMOACÚSTICA M2### 50,862 50,862 50,862 50,862 50,862 50,862 50,862
7.26 TEJA PLÁSTICA No.6 M2### 44,740 44,740 44,740 44,740 44,740 44,740 44,740
7.27 TEJA ESPAÑOLA ETERNIT M2### 81,746 81,746 81,746 81,746 81,746 81,746 81,746
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7.28 30MM M2### 150,774 150,774 150,774 150,774 150,774 150,774 150,774
7.29 TEJA SIN TRASLAPO M2### 67,843 67,843 67,843 67,843 67,843 67,843 67,843
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2### p 42,805 42,805 42,805 42,805 42,805 42,805 42,805
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2### i 33,496 33,496 33,496 33,496 33,496 33,496 33,496
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO o
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2### 58,230 58,230 58,230 58,230 58,230 58,230 58,230
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,138 20,138 20,138 20,138 20,138 20,138 20,138
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,189 24,189 24,189 24,189 24,189 24,189 24,189
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2### 26,182 26,182 26,182 26,182 26,182 26,182 26,182
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2### 33,662 33,662 33,662 33,662 33,662 33,662 33,662
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,267 22,267 22,267 22,267 22,267 22,267 22,267
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,399 52,399 52,399 52,399 52,399 52,399 52,399
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2### 356,888 356,888 356,888 356,888 356,888 356,888 356,888
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2### 411,159 411,159 411,159 411,159 411,159 411,159 411,159
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2### 271,832 271,832 271,832 271,832 271,832 271,832 271,832
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2### 290,254 290,254 290,254 290,254 290,254 290,254 290,254

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3### 462,019 469,744 445,924 467,813 474,895 457,112 467,813
8.2 CONCRETO 3500 PSI M3### 408,642 416,577 392,112 414,593 421,866 401,184 414,593
8.3 CONCRETO 3000 PSI M3### 410,403 419,173 392,133 416,981 425,019 400,601 416,981
8.4 CONCRETO 2500 PSI M3### 358,388 365,905 342,728 364,026 370,916 353,614 364,026
8.5 CONCRETO 2000 PSI M3### 341,163 349,932 322,893 347,740 355,779 332,418 347,740
8.6 CONCRETO 1500 PSI M3### 319,872 330,312 298,122 327,702 337,272 305,682 327,702
8.7 MORTERO SECO 1:10 M3### 230,614 230,614 230,614 230,614 230,614 221,119 230,614
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3### 442,584 442,584 442,584 442,584 442,584 433,365 442,584
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3### 400,668 400,668 400,668 400,668 400,668 393,885 400,668
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3### 462,947 462,947 462,947 462,947 462,947 456,603 462,947
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3### 689,347 689,347 689,347 689,347 689,347 683,003 689,347

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 123,746 123,746 123,746 123,746 123,746 123,746 123,746
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,921 3,921 3,921 3,921 3,921 3,852 3,921
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2### 138,598 138,598 138,598 138,598 138,598 138,598 138,598
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2### 169,592 169,592 169,592 169,592 169,592 169,592 169,592
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 245,993 245,993 245,993 245,993 245,993 245,993 245,993
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 273,763 273,763 273,763 273,763 273,763 273,763 273,763
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 301,566 301,566 301,566 301,566 301,566 301,566 301,566
9.8 HOJA PUERTA FORTEC 0.81 UN ### 200,191 200,191 200,191 200,191 200,191 200,191 200,191
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
9.9 HOJA PUERTA FORTEC 0.91 UN ### p 226,929 226,929 226,929 226,929 226,929 226,929 226,929
9.10 HOJA PUERTA FORTEC 1.50 UN ### i 333,876 333,876 333,876 333,876 333,876 333,876 333,876
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### o 126,665 126,665 126,665 126,665 126,665 126,665 126,665
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 168,107 168,107 168,107 168,107 168,107 168,107 168,107
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 186,823 186,823 186,823 186,823 186,823 186,823 186,823
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 475,583 475,583 475,583 475,583 475,583 475,583 475,583
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,326 42,326 42,326 42,326 42,326 42,326 42,326
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,434 26,434 26,434 26,434 26,434 26,434 26,434
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2### 100,076 100,076 100,076 100,076 100,076 100,076 100,076
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 121,708 121,708 121,708 121,708 121,708 121,708 121,708
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 94,570 94,570 94,570 94,570 94,570 94,570 94,570
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,385 29,385 29,385 29,385 29,385 29,385 29,385
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,385 29,385 29,385 29,385 29,385 29,385 29,385
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,861 27,861 27,861 27,861 27,861 27,861 27,861
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2### 42,637 42,637 42,637 42,637 42,637 42,637 42,637
9.24 ESPEJO BISELADO INCOLORO 4 MM M2### 52,764 52,764 52,764 52,764 52,764 52,764 52,764
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2### 63,565 63,565 63,565 63,565 63,565 63,565 63,565
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2### 76,393 76,393 76,393 76,393 76,393 76,393 76,393
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2### 359,345 359,345 359,345 359,345 359,345 359,345 359,345
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2### 251,327 251,327 251,327 251,327 251,327 251,327 251,327
9.29 VIDRIO TRANSPARENTE 3 MM M2### 33,861 33,861 33,861 33,861 33,861 33,861 33,861
9.30 VIDRIO TRANSPARENTE 4 MM M2### 43,312 43,312 43,312 43,312 43,312 43,312 43,312
9.31 VIDRIO TRANSPARENTE 5 MM M2### 52,764 52,764 52,764 52,764 52,764 52,764 52,764
9.32 VIDRIO TRANSPARENTE 6 MM M2### 66,265 66,265 66,265 66,265 66,265 66,265 66,265

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 76,468 76,468 76,468 76,468 76,468 76,468 76,468
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2### 212,245 212,245 212,245 212,245 212,245 212,245 212,245
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO) ML ### 81,030 81,030 81,030 81,030 81,030 81,030 81,030
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 145,279 145,279 145,279 145,279 145,279 145,279 145,279
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 137,294 137,294 137,294 137,294 137,294 137,294 137,294
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2### 90,146 90,146 90,146 90,146 90,146 90,146 90,146
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 212,316 212,316 212,316 212,316 212,316 212,316 212,316
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 110,677 110,677 110,677 110,677 110,677 110,677 110,677
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,645 6,645 6,645 6,645 6,645 6,645 6,645
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
M2### p 100,229
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2") 100,229 100,229 100,229 100,229 100,229 100,229
i
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) o
10,10(1) H: 2.00 MTS M2### 121,546 121,546 121,546 121,546 121,546 121,546 121,546

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,261 41,261 41,261 41,261 41,261 41,261 41,261
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10.12 E=6MM M2### 541,001 541,001 541,001 541,001 541,001 541,001 541,001
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2### 194,721 194,721 194,721 194,721 194,721 194,721 194,721
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA M2### 218,807 218,807 218,807 218,807 218,807 218,807 218,807

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE


10.15 PUERTAS Y ACCESORIOS) M2### 493,457 493,457 493,457 493,457 493,457 493,457 493,457
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.
10.16 ANTICORROSIVO M2### 129,262 129,262 129,262 129,262 129,262 129,262 129,262
10.17 PUERTA CORTINA INCLUYE ESMALTE M2### 394,450 394,450 394,450 394,450 394,450 394,450 394,450
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,069 6,069 6,069 6,069 6,069 6,069 6,069
10.19 VENTANA EN ALUMINIO CORREDIZA M2### 277,598 277,598 277,598 277,598 277,598 277,598 277,598
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2### 122,997 122,997 122,997 122,997 122,997 122,997 122,997
10.21 REJILLA PISO 0.30 M M2### 86,654 86,654 86,654 86,654 86,654 86,654 86,654
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 89,493 89,493 89,493 89,493 89,493 89,493 89,493
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.
KG ### 10,644 10,644 10,644 10,644 10,644 10,644 10,644
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS
10.24 DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 11,803 11,803 11,803 11,803 11,803 11,803 11,803
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO,
MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,397 9,397 9,397 9,397 9,397 9,397 9,397
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 222,494 222,494 222,494 222,494 222,494 222,494 222,494
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### p 268,113 268,113 268,113 268,113 268,113 268,113 268,113
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### i 22,216 22,216 22,216 22,216 22,216 22,216 22,216
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### o 34,865 34,865 34,865 34,865 34,865 34,865 34,865
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,478 33,478 33,478 33,478 33,478 33,478 33,478
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 42,892 42,892 42,892 42,892 42,892 42,892 42,892
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 88,354 88,354 88,354 88,354 88,354 88,354 88,354
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 223,854 223,854 223,854 223,854 223,854 223,854 223,854
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,290 44,290 44,290 44,290 44,290 44,290 44,290
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 35,289 35,289 35,289 35,289 35,289 35,289 35,289
11.13 NIPLE PASAMURO 2" UN ### 67,206 67,206 67,206 67,206 67,206 67,206 67,206
11.14 NIPLE PASAMURO 4" UN ### 100,402 100,402 100,402 100,402 100,402 100,402 100,402
11.15 PUNTO AGUA CALIENTE CPVC UN ### 84,650 84,650 84,650 84,650 84,650 84,650 84,650
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 61,871 61,871 61,871 61,871 61,871 61,871 61,871
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 65,783 65,783 65,783 65,783 65,783 65,783 65,783
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 83,118 83,118 83,118 83,118 83,118 83,118 83,118
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 66,913 66,913 66,913 66,913 66,913 66,913 66,913
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 83,616 83,616 83,616 83,616 83,616 83,616 83,616
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 89,404 89,404 89,404 89,404 89,404 89,404 89,404
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 73,986 73,986 73,986 73,986 73,986 73,986 73,986
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,550 12,550 12,550 12,550 12,550 12,550 12,550
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,647 17,647 17,647 17,647 17,647 17,647 17,647
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,045 23,045 23,045 23,045 23,045 23,045 23,045
11.26 RED SUMINISTRO PVC 1" ML ### 14,248 14,248 14,248 14,248 14,248 14,248 14,248
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,522 8,522 8,522 8,522 8,522 8,522 8,522
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 51,280 51,280 51,280 51,280 51,280 51,280 51,280
11.29 RED SUMINISTRO PVC 2" ML ### 32,821 32,821 32,821 32,821 32,821 32,821 32,821
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,665 10,665 10,665 10,665 10,665 10,665 10,665
11.31 RED SANITARIA PVC-S 2" ML ### 25,372 25,372 25,372 25,372 25,372 25,372 25,372
11.32 RED SANITARIA PVC-S 3" ML ### 35,186 35,186 35,186 35,186 35,186 35,186 35,186
11.33 RED SANITARIA PVC-S 4" ML ### 47,737 47,737 47,737 47,737 47,737 47,737 47,737
11.34 RED SANITARIA PVC-S 6" ML ### 89,120 89,120 89,120 89,120 89,120 89,120 89,120
11.35 REGISTRO 1" UN ### 108,334 108,334 108,334 108,334 108,334 108,334 108,334
11.36 REGISTRO 1/2" UN ### 60,410 60,410 60,410 60,410 60,410 60,410 60,410
11.37 REGISTRO 3/4" UN ### 76,881 76,881 76,881 76,881 76,881 76,881 76,881
11.38 REGISTRO 1 1/2" UN ### 185,604 185,604 185,604 185,604 185,604 185,604 185,604
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
11.39 REGISTRO 2 1/2" UN ### p 382,568 382,568 382,568 382,568 382,568 382,568 382,568
11.40 REGISTRO 2" UN ### i 282,726 282,726 282,726 282,726 282,726 282,726 282,726
11.41 REVENTILACIÓN 2" ML ### o 17,701 17,701 17,701 17,701 17,701 17,701 17,701
11.42 REVENTILACIÓN 3" ML ### 22,335 22,335 22,335 22,335 22,335 22,335 22,335
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN) UN ### 173,711 173,711 173,711 173,711 173,711 173,711 173,711

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E


11.44 ISNTALACIÓN) UN ### 282,594 282,594 282,594 282,594 282,594 282,594 282,594

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E


11.45 INSTALACIÓN)
UN ### 470,146 470,146 470,146 470,146 470,146 470,146 470,146

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS


11.46 Y SOPORTES) ML ### 40,657 40,657 40,657 40,657 40,657 40,657 40,657

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE


11.47 ACCESORIOS Y SOPORTES)
ML ### 47,935 47,935 47,935 47,935 47,935 47,935 47,935

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS


11.48 Y SOPORTES) ML ### 61,578 61,578 61,578 61,578 61,578 61,578 61,578

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE


11.49 ACCESORIOS Y SOPORTES) ML ### 69,756 69,756 69,756 69,756 69,756 69,756 69,756

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE


11.50 ACCESORIOS Y SOPORTES) ML ### 89,879 89,879 89,879 89,879 89,879 89,879 89,879

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE


11.51 ACCESORIOS Y SOPORTES) ML ### 104,214 104,214 104,214 104,214 104,214 104,214 104,214

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE


11.52 ACCESORIOS Y SOPORTES) ML ### 154,179 154,179 154,179 154,179 154,179 154,179 154,179
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,170 62,170 62,170 62,170 62,170 62,170 62,170
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,422 62,422 62,422 62,422 62,422 62,422 62,422
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 40,202 40,202 40,202 40,202 40,202 40,202 40,202
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 49,506 49,506 49,506 49,506 49,506 49,506 49,506
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE
11.57 HASTA 2" ML ### 4,191 4,191 4,191 4,191 4,191 4,191 4,191

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR


11.58 A 2" ML ### 6,600 6,600 6,600 6,600 6,600 6,600 6,600

11.59 GABINETE TIPO III UN ### 1,020,196 1,020,196 1,020,196 1,020,196 1,020,196 1,020,196 1,020,196
11.60 GABINETE TIPO I UN ### 779,830 779,830 779,830 779,830 779,830 779,830 779,830
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,616,706 2,616,706 2,616,706 2,616,706 2,616,706 2,616,706 2,616,706
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### p 2,181,876 2,181,876 2,181,876 2,181,876 2,181,876 2,181,876 2,181,876
11.63 VÁLVULA MARIPOSA 3" UN ### i 634,648 634,648 634,648 634,648 634,648 634,648 634,648
11.64 VÁLVULA MARIPOSA 4" UN ### o 820,738 820,738 820,738 820,738 820,738 820,738 820,738
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 315,469 315,469 315,469 315,469 315,469 315,469 315,469

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 365,300 365,300 365,300 365,300 365,300 365,300 365,300
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 58,039 58,039 58,039 58,039 58,039 58,039 58,039
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 68,681 68,681 68,681 68,681 68,681 68,681 68,681
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 76,287 76,287 76,287 76,287 76,287 76,287 76,287
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 89,818 89,818 89,818 89,818 89,818 89,818 89,818
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 54,583 54,583 54,583 54,583 54,583 54,583 54,583
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 62,202 62,202 62,202 62,202 62,202 62,202 62,202
12.8 STRIP TELEFÓNICO 10 PARES UN ### 143,746 143,746 143,746 143,746 143,746 143,746 143,746
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 56,034 56,034 56,034 56,034 56,034 56,034 56,034
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 128,740 128,740 128,740 128,740 128,740 128,740 128,740
12.11 SALIDA T.V PVC COMPLETA. UN ### 77,016 77,016 77,016 77,016 77,016 77,016 77,016
12.12 SALIDA BIFÁSICA C.N. UN ### 45,666 45,666 45,666 45,666 45,666 45,666 45,666
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 96,324 96,324 96,324 96,324 96,324 96,324 96,324
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 411,360 411,360 411,360 411,360 411,360 411,360 411,360
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 547,771 547,771 547,771 547,771 547,771 547,771 547,771
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,546 3,546 3,546 3,546 3,546 3,546 3,546
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,683 4,683 4,683 4,683 4,683 4,683 4,683
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,284 7,284 7,284 7,284 7,284 7,284 7,284
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,031 13,031 13,031 13,031 13,031 13,031 13,031
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 273,746 273,746 273,746 273,746 273,746 273,746 273,746
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 77,400 77,400 77,400 77,400 77,400 77,400 77,400
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 104,696 104,696 104,696 104,696 104,696 104,696 104,696
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 42,867 42,867 42,867 42,867 42,867 42,867 42,867
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,404,530 1,404,530 1,404,530 1,404,530 1,404,530 1,404,530 1,404,530
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,040,960 1,040,960 1,040,960 1,040,960 1,040,960 1,040,960 1,040,960
12.26 POSTE METÁLICO 6M UN ### 1,299,231 1,299,231 1,299,231 1,299,231 1,299,231 1,299,231 1,299,231
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 604,116 604,116 604,116 604,116 604,116 604,116 604,116
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 110,473 110,473 110,473 110,473 110,473 110,473 110,473
12.29 LUMINARIA 70W SODIO UN ### 506,803 506,803 506,803 506,803 506,803 506,803 506,803
12.30 LUMINARIA 150W SODIO UN ### 633,973 633,973 633,973 633,973 633,973 633,973 633,973
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,673,969 1,673,969 1,673,969 1,673,969 1,673,969 1,673,969 1,673,969
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### p 1,232,805 1,232,805 1,232,805 1,232,805 1,232,805 1,232,805 1,232,805
i
13 PISOS BASES o
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2### 39,418 39,418 39,418 39,418 39,418 39,174 39,418
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2### 39,084 39,084 39,084 39,084 39,084 38,840 39,084
13.3 ALISTADO PARA LISTÓN M2### 14,707 14,707 14,707 14,707 14,707 14,658 14,707
13.4 ALISTADO PISOS 1:3, E=0.04 M2### 27,054 27,054 27,054 27,054 27,054 26,566 27,054
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2### 84,351 84,351 84,351 84,351 84,351 83,863 84,351
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,088 27,264 26,723 27,220 27,381 26,914 27,220
13.7 CONCRETO BASE GRADAS 2500 PSI M2### 58,593 59,344 57,027 59,157 59,846 58,115 59,157
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2### 81,323 82,526 78,817 82,225 83,328 80,559 82,225
13.9 MANTO FIBERGLASS 600X1 M2### 30,608 30,608 30,608 30,608 30,608 30,608 30,608
13.10 PEGANTE MORTERO-CONCRETO M2### 23,197 23,197 23,197 23,197 23,197 23,197 23,197
13.11 PERMA PLY 2 CAPAS M2### 27,242 27,242 27,242 27,242 27,242 27,242 27,242
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2### 47,726 48,403 46,317 48,234 48,854 47,297 48,234
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2### 55,936 56,763 54,213 56,556 57,314 55,411 56,556
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2### 81,112 82,390 78,450 82,070 83,242 80,300 82,070
13.15 TRITURADO FINO 1/2 M3### 133,660 144,413 111,257 141,725 151,582 111,257 141,725
13.16 TRITURADO GRUESO 3/4 M3### 140,465 151,643 115,355 146,560 159,757 125,305 149,346

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2### 57,525 57,525 57,525 57,525 57,525 57,427 57,525
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,434 34,434 34,434 34,434 34,434 34,385 34,434
14.3 ADOQUÍN CONCRETO 6CM M2### 65,441 65,441 65,441 65,441 65,441 65,197 65,441
14.4 ADOQUÍN CONCRETO 8CM M2### 68,791 68,791 68,791 68,791 68,791 68,547 68,791
14.5 ADOQUÍN GRES PEATONAL M2### 73,077 73,077 73,077 73,077 73,077 72,833 73,077
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO M2### 75,852 75,852 75,852 75,852 75,852 75,754 75,852
14.7 GRAVILLA PARA GRADAS ML ### 37,876 37,980 37,658 37,954 38,050 37,609 37,954
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2### 164,500 164,500 164,500 164,500 164,500 164,061 164,500
14.9 ACABADO EN GRAVILLA LAVADA M2### 47,279 47,488 46,844 47,436 47,627 46,698 47,436
14.10 GUARDAESCOBA EN GRANITO ML ### 44,378 44,378 44,378 44,378 44,378 44,378 44,378
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,542 10,647 10,325 10,620 10,716 10,276 10,620
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,474 9,474 9,474 9,474 9,474 9,474 9,474
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,713 12,713 12,713 12,713 12,713 12,713 12,713
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
14.14 GUARDAESCOBA PINO CARIBE ML ### p 10,653 10,653 10,653 10,653 10,653 10,653 10,653
14.15 GUARDAESCOBA CEDRO BLANCO ML ### i 17,812 17,812 17,812 17,812 17,812 17,812 17,812
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### o 34,656 34,656 34,656 34,656 34,656 34,656 34,656
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,353 9,353 9,353 9,353 9,353 9,353 9,353
14.18 LISTÓN M.H. AMARILLO M2### 75,243 75,243 75,243 75,243 75,243 75,243 75,243
14.19 PASO ESCALERA GRANITO ML ### 119,121 119,121 119,121 119,121 119,121 118,779 119,121
14.20 PIRLANES ALUMINIO ML ### 7,655 7,655 7,655 7,655 7,655 7,655 7,655
14.21 PIRLANES LADRILLO ML ### 32,283 32,283 32,283 32,283 32,283 32,146 32,283
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2### 46,380 46,380 46,380 46,380 46,380 46,380 46,380
14.23 PISO VINILO TRÁFICO PESADO M2### 53,878 53,878 53,878 53,878 53,878 53,878 53,878
14.24 PULIDA LACADA PISO MADERA M2### 49,779 49,779 49,779 49,779 49,779 49,779 49,779
14.25 TABLETA DE GRES 25X25 M2### 49,882 49,882 49,882 49,882 49,882 49,785 49,882
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2### 55,996 55,996 55,996 55,996 55,996 55,899 55,996
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,094 11,094 11,094 11,094 11,094 11,094 11,094
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2### 49,905 49,905 49,905 49,905 49,905 49,699 49,905
14.29 JABONERA PORCELANA ACUARIO UN ### 20,842 20,842 20,842 20,842 20,842 20,842 20,842
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 124,640 124,640 124,640 124,640 124,640 124,640 124,640
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,087 10,087 10,087 10,087 10,087 10,087 10,087
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,763 22,763 22,763 22,763 22,763 22,763 22,763
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,632 14,632 14,632 14,632 14,632 14,632 14,632
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,217 14,217 14,217 14,217 14,217 14,217 14,217
14.35 REMATES BOCEL ALUMINIO ML ### 8,674 8,674 8,674 8,674 8,674 8,674 8,674
14.36 REMATES BOCEL PORCELANA ML ### 8,825 8,825 8,825 8,825 8,825 8,825 8,825
14.37 TAPA REGISTRO 20X20 UN ### 19,296 19,296 19,296 19,296 19,296 19,296 19,296
14.38 TAPA REGISTRO 6X6 UN ### 17,592 17,592 17,592 17,592 17,592 17,592 17,592
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL
14.39 N.5 M2### 18,850 18,850 18,850 18,850 18,850 18,850 18,850
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO M2### 21,791 21,791 21,791 21,791 21,791 21,791 21,791
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2### 65,730 65,730 65,730 65,730 65,730 65,632 65,730
14.42 MEDIA CAÑA EN GRANITO ML ### 78,247 78,247 78,247 78,247 78,247 78,247 78,247
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2### 34,639 34,639 34,639 34,639 34,639 34,639 34,639
14.44 PINTURA ACRÍLICA PARA PISOS M2### 13,433 13,433 13,433 13,433 13,433 13,433 13,433
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2### 102,702 102,702 102,702 102,702 102,702 102,702 102,702
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2### p 124,374 124,374 124,374 124,374 124,374 124,374 124,374
i
15 CIELO RASO o
15.1 APLIQUE YESO ML ### 73,527 73,527 73,527 73,527 73,527 73,527 73,527
15.2 ARMADURA MADERA Y MALLA M2### 36,431 36,431 36,431 36,431 36,431 36,431 36,431
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2### 56,103 56,103 56,103 56,103 56,103 56,103 56,103
15.4 CIELO RASO DURACUSTIC M2### 68,792 68,792 68,792 68,792 68,792 68,792 68,792
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2### 51,365 51,365 51,365 51,365 51,365 51,365 51,365
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2### 95,143 95,143 95,143 95,143 95,143 95,143 95,143
15.7 CORNISAS YESO ML ### 49,339 49,339 49,339 49,339 49,339 49,339 49,339
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2### 105,114 105,114 105,114 105,114 105,114 105,114 105,114
15.9 MALLA CON VENA M2### 13,630 13,630 13,630 13,630 13,630 13,630 13,630

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE
16.2 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 43,707 43,707 43,707 43,707 43,707 43,707 43,707
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3### 49,987 49,987 49,987 49,987 49,987 49,987 49,987

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3### 85,005 85,005 85,005 85,005 85,005 85,005 85,005

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3### 114,774 123,341 89,073 111,347 131,908 131,908 123,341
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3### 142,463 153,947 118,538 151,076 161,603 118,538 151,076
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3### 136,640 212,029 119,506 200,035 170,908 170,908 215,456
16.11 AFRIMADO (NORMA INVIAS 311) M3### 104,680 113,247 78,979 101,253 121,814 121,814 130,381
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3### 136,718 186,407 109,953 174,413 153,852 145,285 189,834
16.13 BASE GRANULAR (NORMA INVIAS 330) M3### 133,609 208,998 116,475 197,005 167,877 167,877 212,425

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 304,976 304,976 304,976 304,976 304,976 304,976 304,976
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE p
17.2 GRIFERÍA) UN ### i 898,174 898,174 898,174 898,174 898,174 898,174 898,174
o
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE
17.3 GRIFERÍA) UN ### 486,845 486,845 486,845 486,845 486,845 486,845 486,845

SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE


17.4 GRIFERÍA) UN ### 141,517 141,517 141,517 141,517 141,517 141,517 141,517

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE


17.5 GRIFERÍA) UN ### 197,894 197,894 197,894 197,894 197,894 197,894 197,894

SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE


17.6 GRIFERÍA)
UN ### 183,817 183,817 183,817 183,817 183,817 183,817 183,817

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 404,093 404,093 404,093 404,093 404,093 404,093 404,093

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE


17.8 GRIFERÍA) UN ### 1,032,850 1,032,850 1,032,850 1,032,850 1,032,850 1,032,850 1,032,850

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 293,669 293,669 293,669 293,669 293,669 293,669 293,669

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A


17.10 BAÑERA UN ### 208,226 208,226 208,226 208,226 208,226 208,226 208,226
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 83,115 83,115 83,115 83,115 83,115 83,115 83,115
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 251,961 251,961 251,961 251,961 251,961 251,961 251,961
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN
17.13 ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 370,940 370,940 370,940 370,940 370,940 370,940 370,940

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2### 8,423 8,423 8,423 8,423 8,423 8,423 8,423
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,120 3,120 3,120 3,120 3,120 3,120 3,120
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2### 11,234 11,234 11,234 11,234 11,234 11,234 11,234
18.4 BARNIZ SOBRE MUEBLES M2### 42,632 42,632 42,632 42,632 42,632 42,632 42,632
18.5 CARBURO SOBRE PAÑETES M2### 5,889 5,889 5,889 5,889 5,889 5,889 5,889
18.6 COLORPLAST FACHADA SOBRE FACHADA M2### 66,249 66,249 66,249 66,249 66,249 66,249 66,249
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,504 3,504 3,504 3,504 3,504 3,504 3,504
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,800 2,800 2,800 2,800 2,800 2,800 2,800
18.9 ESMALTE SOBRE LÁMINA LLENA M2### 14,067 14,067 14,067 14,067 14,067 14,067 14,067
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,073 4,073 4,073 4,073 4,073 4,073 4,073
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
18.11 ESMALTE SOBRE MADERA LLENA M2### p 14,832 14,832 14,832 14,832 14,832 14,832 14,832
18.12 ESMALTE SOBRE MARCOS LÁMINA M2### i 5,794 5,794 5,794 5,794 5,794 5,794 5,794
18.13 ESMALTE SOBRE MARCOS MADERA M2### o 6,595 6,595 6,595 6,595 6,595 6,595 6,595
18.14 ESTUCO M2### 7,085 7,085 7,085 7,085 7,085 7,085 7,085
18.15 ESTUCO (LINEAL) ML ### 4,437 4,437 4,437 4,437 4,437 4,437 4,437
18.16 ESTUCO Y VINILO 3 MANOS M2### 15,660 15,660 15,660 15,660 15,660 15,660 15,660
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,709 9,709 9,709 9,709 9,709 9,709 9,709
18.18 LACA PISOS MADERA M2### 22,974 22,974 22,974 22,974 22,974 22,974 22,974
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,711 2,711 2,711 2,711 2,711 2,711 2,711
18.20 MARMOLINA SOBRE PAÑETE M2### 12,280 12,280 12,280 12,280 12,280 12,280 12,280
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,314 3,314 3,314 3,314 3,314 3,314 3,314
18.22 TINTILLA SOBRE MADERA LLENA M2### 12,710 12,710 12,710 12,710 12,710 12,710 12,710
18.23 VINILO SOBRE PAÑETE 2 MANOS M2### 7,149 7,149 7,149 7,149 7,149 7,149 7,149
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,495 4,495 4,495 4,495 4,495 4,495 4,495
18.25 WASH-PRIMER SOBRE ALUMNIO M2### 21,999 21,999 21,999 21,999 21,999 21,999 21,999
18.26 PINTURA EPÓXICA M2### 12,798 12,798 12,798 12,798 12,798 12,798 12,798
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,908 7,908 7,908 7,908 7,908 7,908 7,908

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,114,048 6,114,048 6,114,048 6,114,048 6,114,048 6,114,048 6,114,048
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,802,582 10,802,582 ### 10,802,582 10,802,582 10,802,582 10,802,582
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,827,095 2,827,095 2,827,095 2,827,095 2,827,095 2,827,095 2,827,095
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,239,024 9,239,024 9,239,024 9,239,024 9,239,024 9,239,024 9,239,024
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,651,858 8,651,858 8,651,858 8,651,858 8,651,858 8,651,858 8,651,858
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,711 2,711 2,711 2,711 2,711 2,711 2,711
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 867,864 867,864 867,864 867,864 867,864 867,864 867,864
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 86,687 86,687 86,687 86,687 86,687 86,687 86,687
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,570,272 1,570,349 1,570,111 1,570,330 1,570,400 1,570,223 1,570,330
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 684,780 686,973 680,213 686,425 688,434 682,330 686,425

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,586 29,586 29,586 29,586 29,586 29,586 29,586
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 43,962 43,962 43,962 43,962 43,962 43,962 43,962
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 54,505 54,505 54,505 54,505 54,505 54,505 54,505
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE p
20.4 ACCESORIOS) ML ### i 17,763 17,763 17,763 17,763 17,763 17,763 17,763
o
TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE
20.5 ACCESORIOS) ML ### 21,520 21,520 21,520 21,520 21,520 21,520 21,520

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,341 29,341 29,341 29,341 29,341 29,341 29,341

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,270 26,270 26,270 26,270 26,270 26,270 26,270
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,696 27,696 27,696 27,696 27,696 27,696 27,696
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,632 34,632 34,632 34,632 34,632 34,632 34,632
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,782 17,782 17,782 17,782 17,782 17,782 17,782
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,307 23,307 23,307 23,307 23,307 23,307 23,307
20.12 VÁLVULA DE BOLA GAS 1" UN ### 35,846 35,846 35,846 35,846 35,846 35,846 35,846
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 274,776 274,776 274,776 274,776 274,776 274,776 274,776
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 316,234 316,234 316,234 316,234 316,234 316,234 316,234
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 329,825 329,825 329,825 329,825 329,825 329,825 329,825
20.16 ACOMETIDA GAS 1/2" ML ### 305,988 305,988 305,988 305,988 305,988 305,988 305,988

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 223,376 223,376 223,376 223,376 223,376 223,376 223,376
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 34,230 34,230 34,230 34,230 34,230 34,230 34,230
21.3 SIRENA DE 110 V UN ### 104,307 104,307 104,307 104,307 104,307 104,307 104,307
21.4 CÁMARA CCTV UN ### 265,071 265,071 265,071 265,071 265,071 265,071 265,071
21.5 PARLANTE-CIELO FALSO UN ### 52,423 52,423 52,423 52,423 52,423 52,423 52,423
21.6 AMPLIFICADOR 100W UN ### 577,611 577,611 577,611 577,611 577,611 577,611 577,611
21.7 AMPLIFICADOR 300W UN ### 1,431,805 1,431,805 1,431,805 1,431,805 1,431,805 1,431,805 1,431,805
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,173 45,173 45,173 45,173 45,173 45,173 45,173
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 223,406 223,406 223,406 223,406 223,406 223,406 223,406
21.10 TOMA PARA MICRÓFONO UN ### 44,337 44,337 44,337 44,337 44,337 44,337 44,337
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,791 3,791 3,791 3,791 3,791 3,791 3,791
21.12 SPLITERS UN ### 6,365 6,365 6,365 6,365 6,365 6,365 6,365
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,781 18,781 18,781 18,781 18,781 18,781 18,781
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,608 24,608 24,608 24,608 24,608 24,608 24,608
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 31,944 31,944 31,944 31,944 31,944 31,944 31,944
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 123,733 123,733 123,733 123,733 123,733 123,733 123,733
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,282 32,282 32,282 32,282 32,282 32,282 32,282
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
21.18 BANDEJA PORTACABLES PARA RACK UN ### p 105,543 105,543 105,543 105,543 105,543 105,543 105,543
21.19 RACK 2' X 24" UN ### i 185,244 185,244 185,244 185,244 185,244 185,244 185,244
21.20 RACK 3' X 24" UN ### o 290,855 290,855 290,855 290,855 290,855 290,855 290,855
21.21 RACK 5' X 24" UN ### 361,418 361,418 361,418 361,418 361,418 361,418 361,418
21.22 RACK 7' X 24" UN ### 394,840 394,840 394,840 394,840 394,840 394,840 394,840
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 578,591 578,591 578,591 578,591 578,591 578,591 578,591
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 340,943 340,943 340,943 340,943 340,943 340,943 340,943
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 104,876 104,876 104,876 104,876 104,876 104,876 104,876
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 13,963 13,963 13,963 13,963 13,963 13,963 13,963
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,535 28,535 28,535 28,535 28,535 28,535 28,535
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,042 5,042 5,042 5,042 5,042 5,042 5,042
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,541 35,541 35,541 35,541 35,541 35,541 35,541
21.30 CANALETA METÁLICA 4X10 CMS ML ### 37,134 37,134 37,134 37,134 37,134 37,134 37,134
21.31 CANALETA METÁLICA 6X10 CMS ML ### 37,930 37,930 37,930 37,930 37,930 37,930 37,930
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,742 24,742 24,742 24,742 24,742 24,742 24,742
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,362 27,362 27,362 27,362 27,362 27,362 27,362
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,464 28,464 28,464 28,464 28,464 28,464 28,464
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 47,815 47,815 47,815 47,815 47,815 47,815 47,815
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 618,385 618,385 618,385 618,385 618,385 618,385 618,385
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 317,737 317,737 317,737 317,737 317,737 317,737 317,737
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 89,280 89,280 89,280 89,280 89,280 89,280 89,280
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,851 1,851 1,851 1,851 1,851 1,851 1,851
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,546 8,546 8,546 8,546 8,546 8,546 8,546
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,739 12,739 12,739 12,739 12,739 12,739 12,739
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,256 21,256 21,256 21,256 21,256 21,256 21,256
21.43 CABLE TELEVISIÓN RG6 ML ### 3,942 3,942 3,942 3,942 3,942 3,942 3,942
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,520 22,520 22,520 22,520 22,520 22,520 22,520
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,746 32,746 32,746 32,746 32,746 32,746 32,746
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,517 19,517 19,517 19,517 19,517 19,517 19,517
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN) ML ### 15,497 15,497 15,497 15,497 15,497 15,497 15,497
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 623,834 623,834 623,834 623,834 623,834 623,834 623,834
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
p URBANISMO
i
1 ACUEDUCTO o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 91,331 91,331 91,331 91,331 91,331 91,331 91,331
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 514,077 514,077 514,077 514,077 514,077 514,077 514,077
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,097,219 1,097,219 1,097,219 1,097,219 1,097,219 1,097,219 1,097,219
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 125,826 125,826 125,826 125,826 125,826 125,826 125,826
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 766,132 766,132 766,132 766,132 766,132 766,132 766,132
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,648,598 1,648,598 1,648,598 1,648,598 1,648,598 1,648,598 1,648,598
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,214 13,214 13,214 13,214 13,214 13,214 13,214
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,285 16,285 16,285 16,285 16,285 16,285 16,285
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,433 20,433 20,433 20,433 20,433 20,433 20,433
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,358 22,358 22,358 22,358 22,358 22,358 22,358
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,792 26,792 26,792 26,792 26,792 26,792 26,792
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,792 26,792 26,792 26,792 26,792 26,792 26,792
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 107,517 107,517 107,517 107,517 107,517 107,517 107,517
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 124,546 124,546 124,546 124,546 124,546 124,546 124,546
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 385,396 385,396 385,396 385,396 385,396 385,396 385,396
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 144,709 144,709 144,709 144,709 144,709 144,709 144,709
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 238,552 238,552 238,552 238,552 238,552 238,552 238,552
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,055,427 1,055,427 1,055,427 1,055,427 1,055,427 1,055,427 1,055,427
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,215,984 1,215,984 1,215,984 1,215,984 1,215,984 1,215,984 1,215,984
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,313 14,313 14,313 14,313 14,313 14,313 14,313
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,636 12,636 12,636 12,636 12,636 12,636 12,636
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,088 31,088 31,088 31,088 31,088 31,088 31,088
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 123,480 123,480 123,480 123,480 123,480 123,480 123,480
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 183,796 183,796 183,796 183,796 183,796 183,796 183,796
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,078 30,078 30,078 30,078 30,078 30,078 30,078
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 103,545 103,545 103,545 103,545 103,545 103,545 103,545
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 153,356 153,356 153,356 153,356 153,356 153,356 153,356
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,381 30,381 30,381 30,381 30,381 30,381 30,381
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 62,622 62,622 62,622 62,622 62,622 62,622 62,622
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 252,044 252,044 252,044 252,044 252,044 252,044 252,044
1.32 UNIÓN REPARACION PVC 4" UN ### 73,050 73,050 73,050 73,050 73,050 73,050 73,050
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 293,219 293,219 293,219 293,219 293,219 293,219 293,219
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 176,001 176,001 176,001 176,001 176,001 176,001 176,001
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### p 500,397 500,397 500,397 500,397 500,397 500,397 500,397
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### i 1,339,644 1,339,644 1,339,644 1,339,644 1,339,644 1,339,644 1,339,644
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### o 1,979,445 1,979,445 1,979,445 1,979,445 1,979,445 1,979,445 1,979,445

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2### 10,824 10,824 10,824 10,824 10,824 10,824 10,824
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2### 24,745 24,745 24,745 24,745 24,745 24,745 24,745
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3### 119,010 129,720 96,698 127,043 136,860 96,698 127,043
2.5 RELLENO TIPO 2 "RECEBO" M3### 109,739 118,306 84,038 106,312 126,873 126,873 118,306
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3### 109,739 118,306 84,038 106,312 126,873 126,873 135,440
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3### 112,431 142,151 112,431 165,723 134,977 143,176 148,300
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3### 62,967 106,846 62,967 106,846 89,085 89,085 94,309
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3### 82,647 82,647 82,647 82,647 82,647 73,703 82,647

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 114,931 114,931 114,931 114,931 114,931 114,931 114,931
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,197,909 1,197,909 1,197,909 1,197,909 1,197,909 1,197,909 1,197,909
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 150,184 150,184 150,184 150,184 150,184 150,184 150,184
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,387,475 1,387,475 1,387,475 1,387,475 1,387,475 1,387,475 1,387,475
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 967,089 967,089 967,089 967,089 967,089 967,089 967,089
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,679 62,679 62,679 62,679 62,679 62,679 62,679
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 114,092 114,092 114,092 114,092 114,092 114,092 114,092
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 269,363 269,363 269,363 269,363 269,363 269,363 269,363
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 269,357 269,357 269,357 269,357 269,357 269,357 269,357
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 432,426 432,426 432,426 432,426 432,426 432,426 432,426
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 114,140 114,140 114,140 114,140 114,140 114,140 114,140
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 114,140 114,140 114,140 114,140 114,140 114,140 114,140
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 269,363 269,363 269,363 269,363 269,363 269,363 269,363
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 269,363 269,363 269,363 269,363 269,363 269,363 269,363
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 432,426 432,426 432,426 432,426 432,426 432,426 432,426
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 434,668 434,668 434,668 434,668 434,668 434,668 434,668
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 705,459 705,459 705,459 705,459 705,459 705,459 705,459
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,132,111 1,132,111 1,132,111 1,132,111 1,132,111 1,132,111 1,132,111
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 69,963 69,963 69,963 69,963 69,963 69,963 69,963
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 363,815 363,815 363,815 363,815 363,815 363,815 363,815
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 407,457 407,457 407,457 407,457 407,457 407,457 407,457
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### p 1,127,989 1,127,989 1,127,989 1,127,989 1,127,989 1,127,989 1,127,989
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### i 65,870 65,870 65,870 65,870 65,870 65,778 65,870
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### o 329,861 329,861 329,861 329,861 329,861 329,861 329,861
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 50,162 50,162 50,162 50,162 50,162 50,162 50,162
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 70,927 70,927 70,927 70,927 70,927 70,927 70,927
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 102,334 102,334 102,334 102,334 102,334 102,334 102,334
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 157,076 157,076 157,076 157,076 157,076 157,076 157,076
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 252,409 252,409 252,409 252,409 252,409 252,409 252,409
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 366,511 366,511 366,511 366,511 366,511 366,511 366,511
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 463,728 463,728 463,728 463,728 463,728 463,728 463,728
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 609,698 609,698 609,698 609,698 609,698 609,698 609,698
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 838,476 838,476 838,476 838,476 838,476 838,476 838,476

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI
4.1 CON REFUERZO) UN ### 678,634 683,896 667,672 682,581 687,404 672,753 682,581

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.


4.2 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 642,143 642,143 642,143 642,143 642,143 639,035 642,143
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
4.3 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 719,557 723,065 712,249 722,188 725,404 715,636 722,188

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI


4.4 CON REFUERZO) UN ### 806,345 812,922 792,642 811,278 817,307 798,993 811,278

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.


4.5 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 911,721 911,721 911,721 911,721 911,721 907,343 911,721
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4.6 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 831,833 836,656 821,784 835,451 839,871 826,442 835,451
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 993,657 994,884 991,099 994,578 995,703 991,118 994,578
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,444,719 1,449,805 1,434,123 1,448,534 1,453,196 1,437,488 1,448,534
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,992,351 2,005,393 1,965,181 2,002,132 2,014,087 1,980,027 2,002,132
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,651,960 2,673,639 2,606,798 2,668,218 2,688,089 2,631,478 2,668,218
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,836,056 1,836,056 1,836,056 1,836,056 1,836,056 1,836,056 1,836,056
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,882,628 3,882,628 3,882,628 3,882,628 3,882,628 3,882,628 3,882,628
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 138,570 138,570 138,570 138,570 138,570 138,443 138,570

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2### 72,708 72,708 72,708 72,708 72,708 72,227 72,708
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2### p 86,228 86,228 86,228 86,228 86,228 85,747 86,228
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2### i 56,631 57,420 54,987 57,223 57,947 56,130 57,223
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2### o 62,093 63,014 60,174 62,783 63,627 61,064 62,783
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2### 61,908 62,741 60,172 62,533 63,296 61,125 62,533
5.6 BORDE SEPARADOR VERDE A-170 ML ### 253,420 253,420 253,420 253,420 253,420 253,293 253,420
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,517 18,612 18,320 18,588 18,675 18,457 18,588
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,522 41,078 39,363 40,939 41,449 40,169 40,939
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 83,249 83,249 83,249 83,249 83,249 83,181 83,249
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 555,877 556,897 553,752 556,642 557,577 552,546 556,642
5.11 LOSETA PREFABRICADA A-40 M2### 61,706 61,706 61,706 61,706 61,706 61,416 61,706
5.12 LOSETA PREFABRICADA A-60 M2### 89,854 89,854 89,854 89,854 89,854 89,564 89,854
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000
5.13 PSI ML ### 33,976 34,344 33,209 34,252 34,590 33,564 34,252

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 54,892 55,637 53,339 55,451 56,134 54,058 55,451
5.15 SARDINEL PREFABRICADO A-10 ML ### 96,691 105,447 94,701 104,054 100,671 100,603 105,845
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2### 59,723 59,723 59,723 59,723 59,723 59,547 59,723

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 203,622 204,061 202,709 203,951 204,353 203,132 203,951
6.2 BANCA EN CONCRETO M-30 UN ### 667,040 667,654 665,761 667,501 668,063 666,354 667,501
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 214,806 214,893 214,623 214,872 214,952 214,718 214,872
6.4 BOLARDO M-60 CONCRETO UN ### 162,777 163,303 161,681 163,172 163,654 162,189 163,172
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 164,645 165,171 163,548 165,039 165,522 164,057 165,039
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 192,739 193,265 191,642 193,133 193,616 192,214 193,133
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 58,317 58,317 58,317 58,317 58,317 57,949 58,317
6.8 BORDILLO PREFABRICADO A-80 ML ### 67,388 67,388 67,388 67,388 67,388 66,976 67,388
6.9 CANECA M-120 UN ### 311,393 311,393 311,393 311,393 311,393 311,300 311,393
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 822,041 822,304 821,493 822,239 822,480 821,747 822,239
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,370,534 3,370,709 3,370,168 3,370,665 3,370,826 3,370,338 3,370,665
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,467,301 3,467,476 3,466,935 3,467,432 3,467,593 3,467,105 3,467,432
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 485,046 485,222 484,681 485,178 485,339 484,871 485,178
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 643,259 643,961 641,798 643,785 644,429 642,560 643,785
6.15 BANCA EN MADERA M-50 UN ### 533,529 533,529 533,529 533,529 533,529 533,529 533,529
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 248,045 248,308 247,497 248,242 248,483 247,751 248,242
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 573,910 573,910 573,910 573,910 573,910 573,680 573,910
6.18 POSTE HISTÓRICO M-131 UN ### 6,408,740 6,410,055 6,405,999 6,409,727 6,410,932 6,407,270 6,409,727
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
p
7 SEÑALIZACIÓN i
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### o 4,027 4,027 4,027 4,027 4,027 4,027 4,027
7.2 MARCA VIAL CON PINTURA EN FRÍO M2### 43,293 43,293 43,293 43,293 43,293 43,293 43,293
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 312,745 312,745 312,745 312,745 312,745 312,682 312,745
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 493,650 494,001 492,920 493,913 494,235 493,301 493,913
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 234,244 234,244 234,244 234,244 234,244 234,180 234,244
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 248,763 248,763 248,763 248,763 248,763 248,699 248,763
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 259,757 259,757 259,757 259,757 259,757 259,693 259,757
7.8 TACHAS REFLECTIVAS UN ### 13,527 13,527 13,527 13,527 13,527 13,527 13,527
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,445 14,445 14,445 14,445 14,445 14,445 14,445
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN) UN ### 117,487 117,487 117,487 117,487 117,487 117,487 117,487
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO
1.1 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS M3### 9,548 9,548 9,548 9,548 9,548 9,548 9,548

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3### 35,314 35,314 35,314 35,314 35,314 35,314 35,314

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES


2.3 210.2.2 Y PRÉSTAMOS M3### 8,749 8,749 8,749 8,749 8,749 8,749 8,749

2.4 220.1 TERRAPLENES M3### 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3### 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3### 7,499 7,499 7,499 7,499 7,499 7,499 7,499
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXIST M2### 481 481 481 481 481 481 481
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3### 12,832 12,832 12,832 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3### 20,948 20,948 20,948 20,948 20,948 20,948 20,948
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 64,959 64,959 64,959 64,959 64,959 64,959 64,959
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 79,733 79,733 79,733 79,733 79,733 79,733 79,733
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO
2.12 600.4 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 19,035 19,035 19,035 19,035 19,035 19,035 19,035
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO
i
2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 M3### p 39,738 39,738 39,738 39,738 39,738 39,738 39,738
KM) i
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE o
2.14 600.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 31,203 31,203 31,203 31,203 31,203 31,203 31,203
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO
2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 M3### 53,644 53,644 53,644 53,644 53,644 53,644 53,644
KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2### 5,366 5,366 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3### 136,718 186,407 109,953 174,413 153,852 145,285 189,834
3.3 330.1 BASE GRANULAR M3### 133,609 208,998 116,475 197,005 167,877 167,877 212,425
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE
3.4 365.1 (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km) M3### 139,125 139,125 139,125 139,125 139,125 139,125 139,125
3.5 420.1 RIEGO DE IMPRIMACIÓN M2### 3,492 3,492 3,492 3,492 3,492 3,492 3,492
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2### 1,185 1,185 1,185 1,185 1,185 1,185 1,185
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
3.7 461.1 ASFÁLTICA M3### 243,961 246,511 238,648 245,873 248,211 239,177 245,873

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2### 65,153 65,241 64,970 65,219 65,299 64,699 65,219
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO) M3### 601,169 599,522 579,752 602,817 642,357 624,234 665,422
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3.10 450.2 P ASFÁLTICO) M3### 607,119 605,472 585,702 608,767 648,307 630,184 671,372
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3.11 450.9 P ASFÁLTICO)
M3### 644,828 643,180 623,410 646,475 686,015 667,893 709,080
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3.12 450.3 P ASFÁLTICO) M3### 636,869 635,222 615,452 638,517 678,057 659,934 701,122
3,12(1) P MEZCLA ASFALTICA NATURAL M3### 346,849 323,650 332,157 339,451 350,412 361,654 312,781
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3### 296,856 372,245 279,722 360,251 331,124 331,124 375,672
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3### 298,302 347,991 271,536 335,997 315,436 306,869 351,417
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3### 38,332 38,332 38,332 38,332 38,332 38,332 38,332
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3### 170,051 170,051 170,051 170,051 170,051 170,051 170,051
3.15 311.1 AFIRMADO M3### 104,680 113,247 78,979 101,253 121,814 121,814 130,381
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2### 12,588 12,792 12,163 12,741 12,928 12,163 12,741
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2### 5,133 5,235 4,921 5,210 5,303 4,921 5,210
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3### 640,121 647,115 625,548 645,367 651,779 635,678 645,367
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE
3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3### 672,359 679,667 657,134 677,840 684,539 667,718 677,840
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
M3### p 693,224
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE
3.20 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN 700,637 677,782 698,784 705,578 688,820 698,784
i
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE o
3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,035 7,035 7,035 7,035 7,035 7,035 7,035
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3### 94,759 155,650 94,759 155,650 131,004 131,004 138,253

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3### 915,410 923,344 898,880 921,360 928,634 910,371 921,360
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3### 789,320 797,122 773,064 795,171 802,324 784,363 795,171
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3### 835,722 843,833 818,822 841,805 849,242 830,569 841,805
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3### 576,378 584,392 559,682 582,388 589,734 568,845 582,388
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3### 672,801 681,132 655,444 679,049 686,686 664,970 679,049
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3### 578,156 587,014 559,704 584,800 592,918 568,256 584,800
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3### 674,650 683,858 655,466 681,557 689,996 664,358 681,557
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3### 737,187 746,045 718,735 743,831 751,950 727,287 743,831
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3### 598,025 607,234 578,842 604,932 613,372 587,733 604,932
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3### 781,525 790,733 762,341 788,432 796,872 771,233 788,432
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE
4.11 650 P DE ACERO A-36 KG ### 11,871 11,871 11,871 11,871 11,871 11,871 11,871

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE


4.12 650 P DE ACERO A-588 GRADO B
KG ### 15,218 15,218 15,218 15,218 15,218 15,218 15,218
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,788 1,788 1,788 1,788 1,788 1,788 1,788
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,681,525 2,681,525 2,681,525 2,681,525 2,681,525 2,681,525 2,681,525
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M.
4.15 621.1 P CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER ML ### 4,121,099 4,134,671 4,092,824 4,131,278 4,143,719 4,112,480 4,131,278
TIPO DE MATERIAL, REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4.16 621.2 REFUERZO) M3### 1,729,350 1,738,120 1,711,080 1,735,928 1,743,966 1,719,548 1,735,928
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 86,872 86,872 86,872 86,872 86,872 86,872 86,872
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 360,549 361,601 358,356 361,338 362,303 359,372 361,338
4.19 632 P BARANDA METÁLICA ML ### 421,804 421,804 421,804 421,804 421,804 421,804 421,804
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,876 16,876 16,876 16,876 16,876 16,876 16,876
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3### 506,397 519,412 474,452 510,096 529,845 512,024 528,021
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3### 129,197 171,242 129,197 204,587 161,093 172,691 179,940
4.23 610.1 RELLENO PARA ESTRUCTURAS M3### 111,992 119,900 88,268 108,829 127,808 127,808 119,900
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3### p 390,293 399,150 371,840 396,936 405,055 381,461 396,936
i
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3### o 369,294 396,698 358,332 395,383 391,244 377,227 389,056
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.26 630.7 ELEVACIONES M3### 377,937 405,341 366,975 404,026 399,887 385,870 397,699
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3### 379,629 406,282 370,233 405,154 400,326 389,945 398,828
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3### 388,272 414,925 378,876 413,797 408,969 398,588 407,471
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3### 519,970 527,562 504,153 525,664 532,623 515,148 525,664
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3### 614,383 622,276 597,940 620,303 627,537 609,370 620,303
4.31 681.1 GAVIÓN M3### 182,253 240,377 182,253 240,377 216,850 216,850 223,770
4.32 681.1 GAVIÓN MALLA PVC M3### 186,397 244,521 186,397 244,521 220,995 220,995 227,914
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4.33 672.1 2500 PSI ML ### 42,447 42,913 41,476 42,797 43,224 42,151 42,797

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE


4.34 672.1 E, 2500 PSI
ML ### 16,395 16,628 15,910 16,570 16,784 16,247 16,570

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO


4.35 *** (RESISTENCIA ÚLTIMA 25 KN)
M2### 10,081 10,081 10,081 10,081 10,081 10,081 10,081

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2### 14,359 14,359 14,359 14,359 14,359 14,359 14,359

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2### 19,313 19,313 19,313 19,313 19,313 19,313 19,313
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2### 23,145 23,145 23,145 23,145 23,145 23,145 23,145
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN)
M2### 29,731 29,731 29,731 29,731 29,731 29,731 29,731
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800
4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 7,234 7,234 7,234 7,234 7,234 7,234 7,234

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 8,241 8,241 8,241 8,241 8,241 8,241 8,241

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 8,564 8,564 8,564 8,564 8,564 8,564 8,564
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700
4.43 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 6,108 6,108 6,108 6,108 6,108 6,108 6,108
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100
4.44 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 9,188 9,188 9,188 9,188 9,188 9,188 9,188
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400
4.45 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 7,496 7,496 7,496 7,496 7,496 7,496 7,496
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 p
4.46 *** M2### 9,188 9,188 9,188 9,188 9,188 9,188 9,188
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) i
o
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000
4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 17,630 17,630 17,630 17,630 17,630 17,630 17,630

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO


4.48 661.1 Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### 627,253 627,253 627,253 627,253 627,253 627,558 627,253
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
4.49 660.3 DIÁMETRO 600 MM
ML ### 361,494 363,248 357,840 362,810 364,418 359,618 362,810

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,


4.50 *** DIÁMETRO 36"
ML ### 878,314 878,314 878,314 878,314 878,314 878,314 878,314

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3### 172,492 180,729 147,779 169,197 188,967 188,967 197,204

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000


4.52 640.1 PSI KG ### 4,410 4,410 4,410 4,410 4,410 4,410 4,410

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E


4.53 *** INSTALACIÓN) ML ### 85,489 85,489 85,489 85,489 85,489 85,489 85,489

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E


4.54 *** INSTALACIÓN) ML ### 130,239 130,239 130,239 130,239 130,239 130,239 130,239
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3### 528,962 536,855 512,519 534,882 542,116 523,949 534,882
4.56 682.1 P COLCHONETA RENO M3### 198,148 256,271 198,148 256,271 232,745 232,745 239,665
4.57 *** TRINCHO EN MADERA M2### 67,654 67,654 67,654 67,654 67,654 67,654 67,654

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,027 4,027 4,027 4,027 4,027 4,027 4,027
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2### 43,293 43,293 43,293 43,293 43,293 43,293 43,293
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 83,391 83,391 83,391 83,391 83,391 83,391 83,391
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 69,381 69,381 69,381 69,381 69,381 69,381 69,381
5.5 730.1 DEFENSA METÁLICA ML ### 147,983 148,391 147,133 148,289 148,663 147,587 148,289
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES UN ### 13,527 13,527 13,527 13,527 13,527 13,527 13,527

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2### 835 835 835 835 835 835 835
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
6.2 801.6 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES UN ### 131,984 131,984 131,984 131,984 131,984 131,984 131,984
A UNA DISTANCIA DE 5 KM
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile
i
ML ### p
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN
6.3 801.7 DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM 25,566 25,566 25,566 25,566 25,566 25,566 25,566
i
6.4 211.1 REMOCIÓN DE DERRUMBES M3### o 8,310 8,310 8,310 8,310 8,310 8,310 8,310
ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5
6.5 801.1 KM) HA ### 448,890 448,890 448,890 448,890 448,890 448,890 448,890
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM) M2### 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2### 15,407 15,407 15,407 15,407 15,407 15,407 15,407
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2### 24,912 24,912 24,912 24,912 24,912 24,912 24,912
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2### 9,475 9,475 9,475 9,475 9,475 9,475 9,475

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

CONSTRUCCIÓN

2,025,217 2,014,255 2,040,322


1,179,424 1,173,943 1,186,976
14,162 14,162 14,162
15,876 15,876 15,876
18,360 18,360 18,360
65,829 65,829 65,829
46,396 46,294 46,542
21,585 21,483 21,731
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
10,480 10,480 10,480
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
909,271 908,347 909,913
10,434 10,434 10,434
3,763 3,763 3,763
2,693,416 2,693,416 2,693,416
249,178 249,178 249,178
9,189 9,189 9,189

130,194 114,774 107,260


186,188 186,188 189,803
297,878 297,878 297,878
207,425 207,425 207,425
22,207 22,207 22,207
656,767 646,229 671,611
656,022 645,840 670,595
611,078 601,544 624,724
49,721 49,721 49,721
153,347 153,347 153,347

191,390 191,390 191,390

237,396 237,396 237,396

299,327 299,327 299,327


105,518 104,896 106,433
130,346 129,445 131,671
596,929 587,395 610,575
91,763 91,763 91,763
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

38,382 38,382 38,405


198,627 198,627 198,649
480,914 478,451 479,055
230,249 228,979 231,559
263,388 261,548 265,312
346,409 343,230 350,280
105,029 105,039 104,947
1,289,860 1,289,960 1,289,046
114,933 114,933 115,181
72,614 72,614 72,745
28,818 28,513 29,209
45,883 45,578 46,274
60,282 59,856 60,830
82,224 81,737 82,850
113,050 112,624 113,598
974,048 969,176 980,312

1,385,027 1,375,283 1,397,555

1,823,317 1,803,829 1,848,373

42,356 42,356 42,356


55,913 55,913 55,913
817,615 808,080 831,260
268,989 258,285 273,267
99,681 98,755 101,006

117,573 116,462 119,163

131,405 129,923 133,524

138,656 137,082 140,908

159,000 157,056 161,782


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

176,904 174,682 180,083

196,366 193,866 199,943


99,783 99,681 99,950
966,042 956,507 979,687
95,228 95,228 95,273
80,490 79,536 81,854
90,623 89,457 92,293
105,700 104,237 107,793
716,747 707,212 730,392
49,650 49,387 50,036
286,239 281,980 292,333
4,205 4,205 4,205
4,410 4,410 4,410
6,185 6,185 6,185
863,857 854,322 877,502
789,051 778,596 804,008
857,852 848,317 871,497
837,774 828,239 851,419
1,048,305 1,038,770 1,061,950
342,344 329,799 359,630

29,805 29,630 30,085


50,192 50,016 50,472
35,100 35,100 35,122
164,442 164,442 164,487
44,437 44,174 44,824
26,832 26,832 26,877
99,299 99,299 99,389
91,796 90,919 93,085
91,843 91,843 91,843
53,845 53,845 53,845
88,447 88,447 88,447
52,147 52,147 52,147
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
102,566 102,566 102,566
60,528 60,528 60,528
114,087 114,087 114,087
66,289 66,289 66,289
40,792 40,792 40,837
24,710 24,710 24,732
53,250 53,250 53,281
32,005 32,005 32,020
59,906 59,906 59,936
36,006 36,006 36,021
99,237 99,237 99,387
58,698 58,698 58,773
37,418 37,418 37,448
22,690 22,690 22,705
74,465 74,465 74,525
44,894 44,894 44,924
88,161 88,161 88,206
53,419 53,419 53,442
182,469 182,469 182,680
109,628 109,628 109,734
89,874 89,874 89,968
54,275 54,275 54,322
46,976 46,976 47,044
28,587 28,587 28,620
33,893 33,893 33,923
20,652 20,652 20,667
51,177 51,177 51,237
31,370 31,370 31,400
98,810 98,810 98,900
60,153 60,153 60,198
72,132 72,132 72,192

43,553 43,553 43,583

151,410 151,410 151,621


92,105 92,105 92,210
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
31,868 31,868 31,890
36,249 36,249 36,316
61,354 61,354 61,444
5,250 5,250 5,250
50,554 50,378 50,834
10,613 10,613 10,613
14,001 14,001 14,001
18,290 18,290 18,290
25,567 25,567 25,567
38,074 38,074 38,074
5,035 4,958 5,142

16,172 16,172 16,172


5,692 5,692 5,714
6,878 6,878 6,900
8,161 8,161 8,184
6,863 6,863 6,863
13,726 13,726 13,726
23,978 23,978 24,044
14,583 14,583 14,616
20,967 20,967 21,030
12,768 12,768 12,799
20,087 20,087 20,153
12,327 12,327 12,360
20,967 20,967 21,030
12,768 12,768 12,799
21,406 21,406 21,452
12,986 12,986 13,009
17,457 17,457 17,506
10,724 10,724 10,748
16,787 16,787 16,837
10,389 10,389 10,414
21,746 21,746 21,809
13,137 13,137 13,168
20,865 20,865 20,931
12,697 12,697 12,729
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
17,397 17,397 17,447
10,676 10,676 10,701
21,755 21,755 21,820
13,545 13,545 13,578

26,618 26,618 26,708


83,733 83,295 84,378
55,598 55,598 55,598
22,216 22,216 22,216
34,865 34,865 34,865
81,189 81,189 81,189
63,615 63,615 63,615
37,076 37,076 37,076
85,081 85,081 85,081
101,558 101,558 101,558
149,166 149,166 149,166
59,063 59,063 59,063
82,139 82,139 82,139
74,707 74,707 74,707
132,281 132,281 132,281
77,213 77,213 77,213
56,759 56,759 56,759
32,484 32,484 32,484
59,242 59,242 59,354
47,311 47,311 47,311
43,383 43,383 43,383
36,711 36,711 36,711
35,936 35,936 35,936
36,206 36,206 36,206
50,862 50,862 50,862
44,740 44,740 44,740
81,746 81,746 81,746
150,774 150,774 150,774
67,843 67,843 67,843
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
42,805 42,805 42,805
33,496 33,496 33,496
58,230 58,230 58,230
20,138 20,138 20,138
24,189 24,189 24,189
26,182 26,182 26,182
33,662 33,662 33,662
22,267 22,267 22,267
52,399 52,399 52,399
356,888 356,888 356,888
411,159 411,159 411,159
271,832 271,832 271,832
290,254 290,254 290,254

460,087 451,074 473,337


406,659 397,402 419,907
408,211 397,980 422,623
356,509 347,739 369,400
338,970 328,739 353,539
317,262 305,082 334,045
230,614 230,614 233,712
442,584 442,584 445,592
400,668 400,668 403,788
462,947 462,947 465,865
689,347 689,347 692,265

123,746 123,746 123,746


3,921 3,921 3,943
138,598 138,598 138,598
169,592 169,592 169,592
245,993 245,993 245,993
273,763 273,763 273,763
301,566 301,566 301,566
200,191 200,191 200,191
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
226,929 226,929 226,929
333,876 333,876 333,876
126,665 126,665 126,665
168,107 168,107 168,107
186,823 186,823 186,823
475,583 475,583 475,583
42,326 42,326 42,326
26,434 26,434 26,434
100,076 100,076 100,076
121,708 121,708 121,708
94,570 94,570 94,570
29,385 29,385 29,385
29,385 29,385 29,385
27,861 27,861 27,861
42,637 42,637 42,637
52,764 52,764 52,764
63,565 63,565 63,565
76,393 76,393 76,393
359,345 359,345 359,345
251,327 251,327 251,327
33,861 33,861 33,861
43,312 43,312 43,312
52,764 52,764 52,764
66,265 66,265 66,265

76,468 76,468 76,468


212,245 212,245 212,245
81,030 81,030 81,030
145,279 145,279 145,279
137,294 137,294 137,294
90,146 90,146 90,146
212,316 212,316 212,316
110,677 110,677 110,677
6,645 6,645 6,645
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

100,229 100,229 100,229

121,546 121,546 121,546

41,261 41,261 41,261

541,001 541,001 541,001


194,721 194,721 194,721

218,807 218,807 218,807

493,457 493,457 493,457

129,262 129,262 129,262


394,450 394,450 394,450
6,069 6,069 6,069
277,598 277,598 277,598
122,997 122,997 122,997
86,654 86,654 86,654
89,493 89,493 89,493

10,644 10,644 10,644

11,803 11,803 11,803

9,397 9,397 9,397

222,494 222,494 222,494


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
268,113 268,113 268,113
22,216 22,216 22,216
34,865 34,865 34,865
33,478 33,478 33,478
42,892 42,892 42,892
88,354 88,354 88,354
223,854 223,854 223,854
44,290 44,290 44,290
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
35,289 35,289 35,289
67,206 67,206 67,206
100,402 100,402 100,402
84,650 84,650 84,650
61,871 61,871 61,871
65,783 65,783 65,783
83,118 83,118 83,118
66,913 66,913 66,913
83,616 83,616 83,616
89,404 89,404 89,404
73,986 73,986 73,986
12,550 12,550 12,550
17,647 17,647 17,647
23,045 23,045 23,045
14,248 14,248 14,248
8,522 8,522 8,522
51,280 51,280 51,280
32,821 32,821 32,821
10,665 10,665 10,665
25,372 25,372 25,372
35,186 35,186 35,186
47,737 47,737 47,737
89,120 89,120 89,120
108,334 108,334 108,334
60,410 60,410 60,410
76,881 76,881 76,881
185,604 185,604 185,604
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
382,568 382,568 382,568
282,726 282,726 282,726
17,701 17,701 17,701
22,335 22,335 22,335
173,711 173,711 173,711

282,594 282,594 282,594

470,146 470,146 470,146

40,657 40,657 40,657

47,935 47,935 47,935

61,578 61,578 61,578

69,756 69,756 69,756

89,879 89,879 89,879

104,214 104,214 104,214

154,179 154,179 154,179


62,170 62,170 62,170
62,422 62,422 62,422
40,202 40,202 40,202
49,506 49,506 49,506

4,191 4,191 4,191

6,600 6,600 6,600

1,020,196 1,020,196 1,020,196


779,830 779,830 779,830
2,616,706 2,616,706 2,616,706
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
2,181,876 2,181,876 2,181,876
634,648 634,648 634,648
820,738 820,738 820,738
315,469 315,469 315,469

365,300 365,300 365,300


58,039 58,039 58,039
68,681 68,681 68,681
76,287 76,287 76,287
89,818 89,818 89,818
54,583 54,583 54,583
62,202 62,202 62,202
143,746 143,746 143,746
56,034 56,034 56,034
128,740 128,740 128,740
77,016 77,016 77,016
45,666 45,666 45,666
96,324 96,324 96,324
411,360 411,360 411,360
547,771 547,771 547,771
3,546 3,546 3,546
4,683 4,683 4,683
7,284 7,284 7,284
13,031 13,031 13,031
273,746 273,746 273,746
77,400 77,400 77,400
104,696 104,696 104,696
42,867 42,867 42,867
1,404,530 1,404,530 1,404,530
1,040,960 1,040,960 1,040,960
1,299,231 1,299,231 1,299,231
604,116 604,116 604,116
110,473 110,473 110,473
506,803 506,803 506,803
633,973 633,973 633,973
1,673,969 1,673,969 1,673,969
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
1,232,805 1,232,805 1,232,805

39,418 39,418 39,531


39,084 39,084 39,196
14,707 14,707 14,729
27,054 27,054 27,279
84,351 84,351 84,575
27,045 26,840 27,336
58,405 57,528 59,694
81,022 79,619 83,085
30,608 30,608 30,608
23,197 23,197 23,197
27,242 27,242 27,242
47,557 46,768 48,718
55,729 54,764 57,147
80,792 79,301 82,984
130,972 118,426 147,101
141,751 131,430 152,273

57,525 57,525 57,570


34,434 34,434 34,456
65,441 65,441 65,553
68,791 68,791 68,903
73,077 73,077 73,189
75,852 75,852 75,896
37,849 37,728 38,029
164,500 164,500 164,702
47,227 46,983 47,607
44,378 44,378 44,378
10,516 10,394 10,695
9,474 9,474 9,474
12,713 12,713 12,713
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
10,653 10,653 10,653
17,812 17,812 17,812
34,656 34,656 34,656
9,353 9,353 9,353
75,243 75,243 75,243
119,121 119,121 119,278
7,655 7,655 7,655
32,283 32,283 32,328
46,380 46,380 46,380
53,878 53,878 53,878
49,779 49,779 49,779
49,882 49,882 49,927
55,996 55,996 56,041
11,094 11,094 11,094
49,905 49,905 49,972
20,842 20,842 20,842
124,640 124,640 124,640
10,087 10,087 10,087
22,763 22,763 22,763
14,632 14,632 14,632
14,217 14,217 14,217
8,674 8,674 8,674
8,825 8,825 8,825
19,296 19,296 19,296
17,592 17,592 17,592
18,850 18,850 18,850

21,791 21,791 21,791


65,730 65,730 65,775
78,247 78,247 78,247
34,639 34,639 34,639
13,433 13,433 13,433
102,702 102,702 102,702
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
124,374 124,374 124,374

73,527 73,527 73,527


36,431 36,431 36,431
56,103 56,103 56,103
68,792 68,792 68,792
51,365 51,365 51,365
95,143 95,143 95,143
49,339 49,339 49,339
105,114 105,114 105,114
13,630 13,630 13,630

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905
43,707 43,707 43,707

49,987 49,987 49,987

85,005 85,005 85,005

19,114 19,114 19,114


130,194 131,908 115,827
139,592 126,194 156,818
201,749 184,615 148,015
120,100 104,680 97,166
169,922 158,993 128,151
198,718 181,584 144,984

304,976 304,976 304,976


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

898,174 898,174 898,174

486,845 486,845 486,845

141,517 141,517 141,517

197,894 197,894 197,894

183,817 183,817 183,817

404,093 404,093 404,093

1,032,850 1,032,850 1,032,850

293,669 293,669 293,669

208,226 208,226 208,226


83,115 83,115 83,115
251,961 251,961 251,961

370,940 370,940 370,940

8,423 8,423 8,423


3,120 3,120 3,120
11,234 11,234 11,234
42,632 42,632 42,632
5,889 5,889 5,889
66,249 66,249 66,249
3,504 3,504 3,504
2,800 2,800 2,800
14,067 14,067 14,067
4,073 4,073 4,073
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
14,832 14,832 14,832
5,794 5,794 5,794
6,595 6,595 6,595
7,085 7,085 7,085
4,437 4,437 4,437
15,660 15,660 15,660
9,709 9,709 9,709
22,974 22,974 22,974
2,711 2,711 2,711
12,280 12,280 12,280
3,314 3,314 3,314
12,710 12,710 12,710
7,149 7,149 7,149
4,495 4,495 4,495
21,999 21,999 21,999
12,798 12,798 12,798
7,908 7,908 7,908

6,114,048 6,114,048 6,114,048


10,802,582 10,802,582 10,802,582
2,827,095 2,827,095 2,827,095
9,239,024 9,239,024 9,239,024
8,651,858 8,651,858 8,651,858
2,711 2,711 2,711
867,864 867,864 867,864
86,687 86,687 86,687
1,570,252 1,570,162 1,570,385
684,232 681,675 687,835

29,586 29,586 29,586


43,962 43,962 43,962
54,505 54,505 54,505
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

17,763 17,763 17,763

21,520 21,520 21,520

29,341 29,341 29,341

26,270 26,270 26,270


27,696 27,696 27,696
34,632 34,632 34,632
17,782 17,782 17,782
23,307 23,307 23,307
35,846 35,846 35,846
274,776 274,776 274,776
316,234 316,234 316,234
329,825 329,825 329,825
305,988 305,988 305,988

223,376 223,376 223,376


34,230 34,230 34,230
104,307 104,307 104,307
265,071 265,071 265,071
52,423 52,423 52,423
577,611 577,611 577,611
1,431,805 1,431,805 1,431,805
45,173 45,173 45,173
223,406 223,406 223,406
44,337 44,337 44,337
3,791 3,791 3,791
6,365 6,365 6,365
18,781 18,781 18,781
24,608 24,608 24,608
31,944 31,944 31,944
123,733 123,733 123,733
32,282 32,282 32,282
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
105,543 105,543 105,543
185,244 185,244 185,244
290,855 290,855 290,855
361,418 361,418 361,418
394,840 394,840 394,840
578,591 578,591 578,591
340,943 340,943 340,943
104,876 104,876 104,876
13,963 13,963 13,963
28,535 28,535 28,535
5,042 5,042 5,042
35,541 35,541 35,541
37,134 37,134 37,134
37,930 37,930 37,930
24,742 24,742 24,742
27,362 27,362 27,362
28,464 28,464 28,464
47,815 47,815 47,815
618,385 618,385 618,385
317,737 317,737 317,737
89,280 89,280 89,280
1,851 1,851 1,851
8,546 8,546 8,546
12,739 12,739 12,739
21,256 21,256 21,256
3,942 3,942 3,942
22,520 22,520 22,520
32,746 32,746 32,746
19,517 19,517 19,517
15,497 15,497 15,497
623,834 623,834 623,834
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

URBANISMO

9,712 9,712 9,712


91,331 91,331 91,331
514,077 514,077 514,077
1,097,219 1,097,219 1,097,219
125,826 125,826 125,826
766,132 766,132 766,132
1,648,598 1,648,598 1,648,598
13,214 13,214 13,214
16,285 16,285 16,285
20,433 20,433 20,433
22,358 22,358 22,358
26,792 26,792 26,792
26,792 26,792 26,792
107,517 107,517 107,517
124,546 124,546 124,546
385,396 385,396 385,396
144,709 144,709 144,709
238,552 238,552 238,552
1,055,427 1,055,427 1,055,427
1,215,984 1,215,984 1,215,984
14,313 14,313 14,313
12,636 12,636 12,636
31,088 31,088 31,088
123,480 123,480 123,480
183,796 183,796 183,796
30,078 30,078 30,078
103,545 103,545 103,545
153,356 153,356 153,356
30,381 30,381 30,381
62,622 62,622 62,622
252,044 252,044 252,044
73,050 73,050 73,050
293,219 293,219 293,219
176,001 176,001 176,001
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
500,397 500,397 500,397
1,339,644 1,339,644 1,339,644
1,979,445 1,979,445 1,979,445

10,824 10,824 10,824


24,745 24,745 24,745
19,114 19,114 19,114
116,333 103,838 132,398
125,160 126,873 110,792
125,160 109,739 102,225
127,803 137,027 117,555
88,041 78,638 74,737
82,647 82,647 85,566

114,931 114,931 114,931


1,197,909 1,197,909 1,197,909
150,184 150,184 150,184
1,387,475 1,387,475 1,387,475
967,089 967,089 967,089
62,679 62,679 62,679
114,092 114,092 114,092
269,363 269,363 269,363
269,357 269,357 269,357
432,426 432,426 432,426
114,140 114,140 114,140
114,140 114,140 114,140
269,363 269,363 269,363
269,363 269,363 269,363
432,426 432,426 432,426
434,668 434,668 434,668
705,459 705,459 705,459
1,132,111 1,132,111 1,132,111
69,963 69,963 69,963
363,815 363,815 363,815
407,457 407,457 407,457
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
1,127,989 1,127,989 1,127,989
65,870 65,870 65,900
329,861 329,861 329,861
50,162 50,162 50,162
70,927 70,927 70,927
102,334 102,334 102,334
157,076 157,076 157,076
252,409 252,409 252,409
366,511 366,511 366,511
463,728 463,728 463,728
609,698 609,698 609,698
838,476 838,476 838,476

677,319 671,181 685,966

642,143 642,143 643,573

718,680 714,588 724,445

804,701 797,028 815,510

911,721 911,721 913,734

830,627 825,000 838,554


993,350 991,917 995,894
1,443,447 1,437,513 1,452,729
1,989,091 1,973,876 2,010,857
2,646,542 2,621,251 2,682,721
1,836,056 1,836,056 1,836,056
3,882,628 3,882,628 3,882,628
138,570 138,570 138,628

72,708 72,708 72,865


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
86,228 86,228 86,385
56,434 55,513 57,787
61,863 60,788 63,376
61,700 60,728 63,091
253,420 253,420 253,478
18,493 18,383 18,656
40,383 39,734 41,337
83,249 83,249 83,280
555,622 554,432 557,706
61,706 61,706 61,840
89,854 89,854 89,988
33,884 33,454 34,489

54,705 53,836 55,930


104,253 102,263 98,149
59,723 59,723 59,804

203,513 203,001 204,233


666,887 666,170 667,895
214,784 214,682 214,930
162,645 162,032 163,510
164,513 163,899 165,378
192,607 191,993 193,481
58,317 58,317 58,438
67,388 67,388 67,523
311,393 311,393 311,423
821,975 821,669 822,408
3,370,490 3,370,285 3,370,778
3,467,257 3,467,052 3,467,545
485,003 484,798 485,294
643,084 642,265 644,249
533,529 533,529 533,529
247,979 247,672 248,411
573,910 573,910 573,985
6,408,411 6,406,876 6,410,573
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

4,027 4,027 4,027


43,293 43,293 43,293
312,745 312,745 312,775
493,563 493,153 494,145
234,244 234,244 234,273
248,763 248,763 248,792
259,757 259,757 259,786
13,527 13,527 13,527
14,445 14,445 14,445

117,487 117,487 117,487


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

PECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548

35,314 35,314 35,314

8,749 8,749 8,749

14,967 14,967 14,967


13,068 13,068 13,068
7,499 7,499 7,499
481 481 481
12,832 12,832 12,832

20,948 20,948 20,948

64,959 64,959 64,959

79,733 79,733 79,733

19,035 19,035 19,035


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

39,738 39,738 39,738

31,203 31,203 31,203

53,644 53,644 53,644

5,366 5,366 5,366


169,922 158,993 128,151
198,718 181,584 144,984
139,125 139,125 139,125
3,492 3,492 3,492
1,185 1,185 1,185
243,323 240,348 247,227

65,131 65,029 65,445


576,457 640,709 587,989

582,407 646,659 593,939

620,115 684,368 631,648

612,157 676,409 623,689


383,605 369,396 341,748
361,965 344,831 308,231
331,505 320,576 289,735
38,332 38,332 38,332
170,051 170,051 170,051
120,100 104,680 97,166
12,537 12,299 12,843
5,108 4,989 5,261
638,372 630,211 650,368

670,532 662,006 683,065


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

691,371 682,724 704,129

7,035 7,035 7,035


129,554 116,506 110,643

913,426 904,169 927,034


787,368 778,265 800,751
833,693 824,230 847,606
574,375 565,025 587,755
670,718 660,999 684,629
575,942 565,609 590,498
672,348 661,606 687,481
734,973 724,640 749,530
595,723 584,981 610,856
779,223 768,481 794,356

11,871 11,871 11,871

15,218 15,218 15,218


1,788 1,788 1,788
2,681,525 2,681,525 2,681,525

4,117,706 4,101,872 4,140,982

1,727,158 1,716,927 1,741,570


86,872 86,872 86,872
360,286 359,058 362,015
421,804 421,804 421,804
16,876 16,876 16,876
513,952 495,429 513,116
150,944 163,993 136,446
126,226 127,808 112,964
NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá
388,078 377,745 402,793
380,631 369,748 382,496

389,274 378,391 391,139


391,155 381,148 392,012
399,798 389,791 400,655
518,072 509,215 531,092
612,410 603,201 625,945
215,466 203,011 197,415
219,611 207,156 201,559

42,330 41,787 43,130

16,337 16,065 16,737

10,081 10,081 10,081

14,359 14,359 14,359

19,313 19,313 19,313

23,145 23,145 23,145

29,731 29,731 29,731

7,234 7,234 7,234

8,241 8,241 8,241

8,564 8,564 8,564

6,108 6,108 6,108

9,188 9,188 9,188

7,496 7,496 7,496


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

9,188 9,188 9,188

17,630 17,630 17,630

627,253 627,253 627,298

361,056 359,010 364,028

878,314 878,314 878,314

187,319 172,492 165,267

4,410 4,410 4,410

85,489 85,489 85,489

130,239 130,239 130,239


526,989 517,780 540,524
231,361 218,906 213,310
67,654 67,654 67,654

4,027 4,027 4,027


43,293 43,293 43,293
83,391 83,391 83,391
69,381 69,381 69,381
147,881 147,405 148,561

13,527 13,527 13,527

835 835 835

131,984 131,984 131,984


NACIÓN DE CUNDINAMARCA
ONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
ROVINCIA: TEQUENDAMA
TEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
San_Ant_Teque
ndama Tena Viotá

25,566 25,566 25,566


8,310 8,310 8,310
448,890 448,890 448,890

1,804 1,804 1,804


15,407 15,407 15,407
24,912 24,912 24,912
9,475 9,475 9,475

DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
p CONSTRUCCIÓN
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ### o 2,015,826 2,012,942 2,020,875 2,030,973 2,020,154 2,035,300 2,028,810
1.2 CAMPAMENTO 9 M2 UN ### 1,175,973 1,174,531 1,178,498 1,183,547 1,178,137 1,185,710 1,182,465
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,302 14,302 14,302 14,302 14,302 14,302 14,302
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,035 16,035 16,035 16,035 16,035 16,035 16,035
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,536 18,536 18,536 18,536 18,536 18,536 18,536
1.6 CERCA EN TABLA H=2.30 M ML ### 66,935 66,935 66,935 66,935 66,935 66,935 66,935
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,805 46,773 46,860 46,970 46,852 47,017 46,946
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,545 21,514 21,600 21,710 21,592 21,757 21,687
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2### 80,242 80,242 80,242 80,242 80,242 80,242 80,242
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2### 6,261 6,261 6,261 6,261 6,261 6,261 6,261
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2### 8,882 8,882 8,882 8,882 8,882 8,882 8,882
1.12 DEMOLICIÓN ENCHAPE MURO M2### 6,813 6,813 6,813 6,813 6,813 6,813 6,813
1.13 DEMOLICIÓN PAÑETE MURO M2### 7,419 7,419 7,419 7,419 7,419 7,419 7,419
1.14 DEMOLICIÓN CIELO RASO FALSO M2### 8,964 8,964 8,964 8,964 8,964 8,964 8,964
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2### 9,084 9,084 9,084 9,084 9,084 9,084 9,084
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2### 13,497 13,497 13,497 13,497 13,497 13,497 13,497
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2### 18,477 18,477 18,477 18,477 18,477 18,477 18,477
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2### 27,441 27,441 27,441 27,441 27,441 27,441 27,441
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2### 39,898 39,898 39,898 39,898 39,898 39,898 39,898
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2### 49,367 49,367 49,367 49,367 49,367 49,367 49,367
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2### 40,806 40,806 40,806 40,806 40,806 40,806 40,806
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2### 57,319 57,319 57,319 57,319 57,319 57,319 57,319
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2### 67,872 67,872 67,872 67,872 67,872 67,872 67,872
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2### 83,193 83,193 83,193 83,193 83,193 83,193 83,193
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2### 9,103 9,103 9,103 9,103 9,103 9,103 9,103
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2### 14,736 14,736 14,736 14,736 14,736 14,736 14,736
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2### 22,422 22,422 22,422 22,422 22,422 22,422 22,422
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2### 36,746 36,746 36,746 36,746 36,746 36,746 36,746
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3### 233,157 233,157 233,157 233,157 233,157 233,157 233,157
1.30 DESCAPOTE A MAQUINA E=0.20 M M2### 1,539 1,539 1,539 1,539 1,539 1,539 1,539
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2### 5,807 5,807 5,807 5,807 5,807 5,807 5,807
1.32 DESMONTE APARATOS SANITARIOS UN ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2### 11,307 11,307 11,307 11,307 11,307 11,307 11,307
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2### 10,480 10,480 10,480 10,480 10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2### i 9,803 9,803 9,803 9,803 9,803 9,803 9,803
p
1.37 DESMONTE MUROS SECOS M2###
i 15,459 15,459 15,459 15,459 15,459 15,459 15,459
1.38 DESMONTE MARCOS Y PUERTAS UN ### o 13,512 13,512 13,512 13,512 13,512 13,512 13,512
1.39 DESMONTE VENTANAS M2### 11,490 11,490 11,490 11,490 11,490 11,490 11,490
1.40 LETRINA DE 2.0x1.0 UN ### 919,089 918,178 919,440 921,733 920,058 922,702 921,796
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS
1.41 DE PRESICIÓN M2### 10,595 10,595 10,595 10,595 10,595 10,595 10,595
1.42 REPLANTEO MANUAL DE CIMIENTOS M2### 3,827 3,827 3,827 3,827 3,827 3,827 3,827
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,742,727 2,742,727 2,742,727 2,742,727 2,742,727 2,742,727 2,742,727
1.44 RED TELEFÓNICA PROVISIONAL UN ### 253,285 253,285 253,285 253,285 253,285 253,285 253,285
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE) M3### 9,189 9,189 9,189 9,189 9,189 9,189 9,189

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3### 90,126 79,845 86,699 107,260 98,693 115,827 112,400
2.2 BASE ARENA CEMENTO 1:20 M3### 204,156 200,715 210,177 222,220 209,317 227,380 219,639
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3### 297,878 297,878 297,878 297,878 297,878 297,878 297,878
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3### 207,425 207,425 207,425 207,425 207,425 207,425 207,425
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2### 22,581 22,581 22,581 22,581 22,581 22,581 22,581
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3### 629,386 626,304 634,779 645,565 634,008 650,187 643,254
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3### 630,538 627,341 636,133 647,324 635,334 652,118 644,925
2.8 ZAPATAS EN CONCRETO 3500 PSI M3### 586,842 583,848 592,081 602,559 591,332 607,048 600,313
2.9 PILOTE DE MADERA D=20 CM ML ### 49,907 49,907 49,907 49,907 49,907 49,907 49,907
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE
2.10 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 153,950 153,950 153,950 153,950 153,950 153,950 153,950
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE
2.11 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 192,736 192,736 192,736 192,736 192,736 192,736 192,736
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE
2.12 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 239,639 239,639 239,639 239,639 239,639 239,639 239,639
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE
2.13 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 302,778 302,778 302,778 302,778 302,778 302,778 302,778
2.14 PILOTE HINCADO 25X25 ML ### 104,524 104,306 104,906 105,670 104,851 105,997 105,506
2.15 PILOTE HINCADO 30X30 ML ### 128,905 128,589 129,459 130,566 129,380 131,040 130,329
2.16 DADOS EN CONCRETO 3500PSI M3### 572,692 569,699 577,932 588,410 577,183 592,899 586,164
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM)
ML ### 92,160 92,160 92,160 92,160 92,160 92,160 92,160

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### i 39,009 38,988 39,046 39,121 39,041 39,153 39,105
p
3.2 SIFÓN EN PVC 6" UN ###
i 202,449 202,428 202,486 202,561 202,481 202,593 202,545
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### o 452,654 446,509 453,084 467,157 458,567 473,071 468,743
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 226,179 225,383 226,702 228,863 227,095 229,778 228,788
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 256,648 255,364 257,527 261,036 258,136 262,525 260,894
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 336,392 334,669 338,039 343,085 338,539 345,231 342,613
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 105,372 105,312 105,352 105,471 105,422 105,521 105,501
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,311,821 1,311,224 1,311,622 1,312,816 1,312,319 1,313,314 1,313,115
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 117,518 117,282 117,931 118,758 117,872 119,112 118,581
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 74,312 74,188 74,530 74,966 74,499 75,153 74,873
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,009 27,956 28,103 28,290 28,090 28,370 28,250
3.12 TUBERÍA DRENAJE PVC 160 ML ### 45,407 45,354 45,500 45,687 45,487 45,768 45,647
3.13 TUBERÍA DRENAJE PVC 200 ML ### 59,593 59,519 59,724 59,986 59,706 60,098 59,930
3.14 TUBERÍA DRENAJE PVC 250 ML ### 81,732 81,646 81,881 82,181 81,860 82,309 82,116
3.15 TUBERÍA DRENAJE PVC 315 ML ### 113,441 113,366 113,571 113,833 113,553 113,945 113,777
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3.16 MATERIAL FILTRANTE) UN ### 972,918 972,063 974,414 977,406 974,200 978,688 976,765
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3.17 MATERIAL FILTRANTE) UN ### 1,373,020 1,371,311 1,376,012 1,381,996 1,375,585 1,384,560 1,380,714
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3.18 MATERIAL FILTRANTE) UN ### 1,781,600 1,778,181 1,787,584 1,799,552 1,786,730 1,804,680 1,796,987

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2### 43,044 43,044 43,044 43,044 43,044 43,044 43,044
4.2 CASETÓN DE LONA 0.80X0.70 M2### 56,883 56,883 56,883 56,883 56,883 56,883 56,883
4.3 COLUMNAS 3500 PSI M3### 795,354 792,361 800,594 811,072 799,845 815,561 808,825
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3### 237,939 239,423 244,118 259,819 248,668 255,085 247,559
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4.5 MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2### 98,199 97,908 98,707 99,725 98,635 100,160 99,506
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.
4.6 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2### 115,816 115,468 116,427 117,648 116,340 118,170 117,386
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO)
M2### 128,041 127,576 128,855 130,483 128,739 131,180 130,134

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN


4.8 REFUERZO) M2### 135,079 134,585 135,944 137,673 135,820 138,414 137,302

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN


4.9 REFUERZO) M2### 154,510 153,900 155,578 157,714 155,425 158,630 157,256
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN
4.10 M2### p 171,744 171,047 172,965 175,407 172,791 176,452 174,883
REFUERZO)
i
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN o
4.11 REFUERZO) M2### 190,528 189,744 191,902 194,648 191,705 195,825 194,059
4.12 ENTREPISO VIGUETA PLACA M2### 101,024 100,974 101,112 101,287 101,099 101,362 101,249
4.13 ESCALERA MACIZA 3500 PSI M3### 946,309 943,316 951,549 962,027 950,800 966,516 959,781
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2### 97,037 96,995 97,112 97,262 97,102 97,326 97,230
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2### 78,299 77,999 78,823 79,870 78,748 80,319 79,646
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2### 87,884 87,517 88,525 89,806 88,433 90,355 89,532
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2### 102,196 101,737 103,000 104,608 102,885 105,296 104,263
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3### 693,139 690,145 698,378 708,856 697,629 713,345 706,610
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI
4.19 (ANCHO 1 M) UN ### 49,224 49,131 49,385 49,708 49,362 49,847 49,639

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2### 275,409 274,072 277,749 282,428 277,414 284,433 281,425
4.21 ACERO FIGURADO 37000 PSI KG ### 4,280 4,280 4,280 4,280 4,280 4,280 4,280
4.22 ACERO FIGURADO 60000 PSI KG ### 4,489 4,489 4,489 4,489 4,489 4,489 4,489
4.23 REFUERZO MALLA ELECTROSOLDADA KG ### 6,266 6,266 6,266 6,266 6,266 6,266 6,266
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3### 840,773 837,780 846,013 856,491 845,264 860,980 854,245
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3### 762,744 759,468 768,478 779,946 767,659 784,859 777,488
4.26 VIGA AÉREA 3500 PSI M3### 835,019 832,026 840,259 850,737 839,510 855,226 848,491
4.27 VIGA CINTA 3500 PSI M3### 814,950 811,957 820,190 830,668 819,441 835,157 828,422
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3### 1,025,682 1,022,689 1,030,921 1,041,400 1,030,173 1,045,888 1,039,153
4.29 BASE EN CONCRETO POBRE 1500 PSI M3### 302,994 299,693 308,772 320,329 307,947 325,281 317,853

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,554 29,471 29,699 29,989 29,679 30,114 29,927
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 49,966 49,883 50,111 50,401 50,090 50,526 50,339
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,491 35,469 35,528 35,603 35,523 35,635 35,587
5.4 ARCOS EN LADRILLO PRENSADO ML ### 166,081 166,038 166,156 166,306 166,145 166,370 166,273
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 43,997 43,905 44,158 44,482 44,135 44,620 44,412
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,288 27,245 27,363 27,513 27,352 27,577 27,481
5.7 ENCHAPES LADRILLO PRENSADO M2### 101,342 101,256 101,491 101,791 101,470 101,919 101,726
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2### 90,290 89,982 90,828 91,905 90,751 92,367 91,675
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2### 93,030 93,030 93,030 93,030 93,030 93,030 93,030
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 54,438 54,438 54,438 54,438 54,438 54,438 54,438
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2### 89,564 89,564 89,564 89,564 89,564 89,564 89,564
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,705 52,705 52,705 52,705 52,705 52,705 52,705
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2### i 104,051 104,051 104,051 104,051 104,051 104,051 104,051
p
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ###
i 61,271 61,271 61,271 61,271 61,271 61,271 61,271
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2### o 115,812 115,812 115,812 115,812 115,812 115,812 115,812
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 67,151 67,151 67,151 67,151 67,151 67,151 67,151
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2### 41,488 41,445 41,563 41,713 41,552 41,778 41,681
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,058 25,036 25,095 25,170 25,090 25,203 25,154
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2### 54,173 54,144 54,223 54,323 54,216 54,366 54,302
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,466 32,452 32,491 32,541 32,487 32,562 32,530
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2### 60,922 60,893 60,972 61,072 60,965 61,115 61,051
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,514 36,499 36,539 36,589 36,535 36,610 36,578
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2### 101,316 101,172 101,566 102,067 101,530 102,282 101,960
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 59,737 59,665 59,862 60,113 59,844 60,220 60,059
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2### 38,010 37,981 38,060 38,160 38,053 38,203 38,139
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,986 22,971 23,011 23,061 23,007 23,082 23,050
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2### 75,703 75,646 75,803 76,004 75,789 76,090 75,961
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,513 45,484 45,563 45,663 45,556 45,706 45,642
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2### 89,763 89,721 89,838 89,988 89,827 90,052 89,956
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 54,220 54,199 54,258 54,332 54,252 54,364 54,316
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2### 186,219 186,018 186,569 187,271 186,519 187,572 187,121
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 111,503 111,403 111,679 112,030 111,654 112,180 111,954
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2### 91,475 91,392 91,622 91,916 91,601 92,042 91,853
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 55,076 55,034 55,150 55,296 55,139 55,359 55,265
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2### 47,877 47,813 47,989 48,214 47,973 48,310 48,166
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,037 29,005 29,093 29,205 29,085 29,254 29,181
5.37 MURO TOLETE COMÚN 0.06 M M2### 34,422 34,393 34,472 34,572 34,465 34,615 34,551
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,917 20,902 20,942 20,992 20,938 21,013 20,981
5.39 MURO TOLETE COMÚN 0.12 M M2### 52,168 52,111 52,268 52,469 52,254 52,555 52,426
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,865 31,836 31,915 32,015 31,908 32,058 31,994
5.41 MURO TOLETE COMÚN 0.25 M M2### 100,686 100,600 100,836 101,137 100,815 101,266 101,073
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 61,091 61,048 61,166 61,317 61,156 61,381 61,285
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2### 73,454 73,397 73,554 73,755 73,540 73,841 73,712
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
5.44 (LINEAL) ML ### 44,226 44,198 44,277 44,377 44,269 44,420 44,355
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2### 154,634 154,434 154,985 155,687 154,935 155,987 155,537
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA
5.46 (LINEAL) ML ### 93,734 93,634 93,910 94,260 93,885 94,411 94,185
5.47 REMATES LADRILLO PRENSADO ML ### 32,329 32,308 32,366 32,441 32,361 32,473 32,425
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,882 36,822 36,988 37,199 36,973 37,289 37,154
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### i 62,349 62,269 62,490 62,772 62,470 62,893 62,712
p
5.50 LAVADA DE FACHADA M2###
i 5,264 5,264 5,264 5,264 5,264 5,264 5,264
5.51 PASAMANOS EN CONCRETO 2500 PSI ML ### o 50,331 50,248 50,476 50,767 50,456 50,891 50,704
5.52 DOVELA, GROUTING 3000 PSI ML ### 10,637 10,637 10,637 10,637 10,637 10,637 10,637
5.53 ANCLAJE 3/8" L=30CM UN ### 14,076 14,076 14,076 14,076 14,076 14,076 14,076
5.54 ANCLAJE 1/2" L=50CM UN ### 18,400 18,400 18,400 18,400 18,400 18,400 18,400
5.55 ANCLAJE 5/8" L=70CM UN ### 25,792 25,792 25,792 25,792 25,792 25,792 25,792
5.56 ANCLAJE 3/4" L=70CM UN ### 38,506 38,506 38,506 38,506 38,506 38,506 38,506
5.57 ANCLAJE 1" L= 70CM UN ### 4,824 4,802 4,864 4,942 4,858 4,975 4,925

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2### 16,241 16,241 16,241 16,241 16,241 16,241 16,241
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,814 5,792 5,851 5,926 5,846 5,958 5,910
6.3 FILOS O DILATACIONES S/MURO ML ### 7,000 6,978 7,037 7,112 7,032 7,144 7,096
6.4 GOTERA EN MORTERO 1:4 ML ### 8,303 8,281 8,340 8,415 8,335 8,447 8,399
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2### 6,957 6,957 6,957 6,957 6,957 6,957 6,957
6.6 MALLA BAJO ENTRAMADO M2### 13,818 13,818 13,818 13,818 13,818 13,818 13,818
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2### 24,273 24,214 24,376 24,582 24,361 24,670 24,538
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,731 14,701 14,782 14,885 14,775 14,929 14,863
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2### 21,372 21,312 21,477 21,688 21,462 21,778 21,643
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 12,970 12,940 13,023 13,128 13,015 13,173 13,105
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2### 20,382 20,323 20,485 20,691 20,470 20,779 20,647
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,475 12,446 12,526 12,629 12,519 12,673 12,607
6.13 PAÑETE CULATAS 1:4, E=2 CM M2### 21,372 21,312 21,477 21,688 21,462 21,778 21,643
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 12,970 12,940 13,023 13,128 13,015 13,173 13,105
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2### 21,718 21,676 21,791 21,938 21,781 22,000 21,906
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,142 13,121 13,178 13,252 13,173 13,283 13,236
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2### 17,766 17,720 17,846 18,006 17,835 18,075 17,972
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,878 10,855 10,918 10,999 10,913 11,033 10,981
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2### 17,012 16,967 17,090 17,247 17,079 17,314 17,213
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,501 10,479 10,540 10,619 10,535 10,652 10,602
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2### 22,150 22,090 22,256 22,466 22,241 22,556 22,421
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,339 13,309 13,392 13,497 13,384 13,542 13,474
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2### 21,160 21,102 21,263 21,469 21,248 21,557 21,425
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,844 12,815 12,895 12,998 12,888 13,042 12,976
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2### 17,622 17,577 17,700 17,857 17,689 17,924 17,823
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,789 10,766 10,828 10,906 10,822 10,940 10,889
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2### i 22,050 21,991 22,153 22,358 22,138 22,446 22,314
p
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ###
i 13,693 13,664 13,744 13,847 13,737 13,891 13,825
o
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2### 27,197 27,111 27,347 27,648 27,325 27,776 27,583
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN
7.2 ASFALTO (INCLUYE TELA IMPERMEABLE) M2### 83,619 83,465 83,888 84,427 83,850 84,658 84,311
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 56,536 56,536 56,536 56,536 56,536 56,536 56,536
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,507 22,507 22,507 22,507 22,507 22,507 22,507
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,352 35,352 35,352 35,352 35,352 35,352 35,352
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 82,632 82,632 82,632 82,632 82,632 82,632 82,632
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 64,693 64,693 64,693 64,693 64,693 64,693 64,693
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,602 37,602 37,602 37,602 37,602 37,602 37,602
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 86,602 86,602 86,602 86,602 86,602 86,602 86,602
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 103,423 103,423 103,423 103,423 103,423 103,423 103,423
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 152,019 152,019 152,019 152,019 152,019 152,019 152,019
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 60,007 60,007 60,007 60,007 60,007 60,007 60,007
7.13 CANAL PVC AMAZONAS ML ### 83,358 83,358 83,358 83,358 83,358 83,358 83,358
7.14 CANAL PVC RAINGO ML ### 75,770 75,770 75,770 75,770 75,770 75,770 75,770
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2### 134,596 134,596 134,596 134,596 134,596 134,596 134,596
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2### 78,621 78,621 78,621 78,621 78,621 78,621 78,621
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2### 57,743 57,743 57,743 57,743 57,743 57,743 57,743
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,848 32,848 32,848 32,848 32,848 32,848 32,848
7.19 TEJA DE BARRO M2### 60,361 60,254 60,548 60,922 60,521 61,082 60,842
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2### 48,136 48,136 48,136 48,136 48,136 48,136 48,136
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2### 44,127 44,127 44,127 44,127 44,127 44,127 44,127
7.22 TEJA FIBROCEMENTO Nº4 M2### 37,196 37,196 37,196 37,196 37,196 37,196 37,196
7.23 TEJA FIBROCEMENTO No. 6 M2### 36,423 36,423 36,423 36,423 36,423 36,423 36,423
7.24 TEJA FIBROCEMENTO No. 8 M2### 36,698 36,698 36,698 36,698 36,698 36,698 36,698
7.25 TEJA TERMOACÚSTICA M2### 51,674 51,674 51,674 51,674 51,674 51,674 51,674
7.26 TEJA PLÁSTICA No.6 M2### 45,425 45,425 45,425 45,425 45,425 45,425 45,425
7.27 TEJA ESPAÑOLA ETERNIT M2### 83,164 83,164 83,164 83,164 83,164 83,164 83,164
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7.28 30MM M2### 153,599 153,599 153,599 153,599 153,599 153,599 153,599
7.29 TEJA SIN TRASLAPO M2### 69,037 69,037 69,037 69,037 69,037 69,037 69,037
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2### 43,211 43,211 43,211 43,211 43,211 43,211 43,211
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2### 33,870 33,870 33,870 33,870 33,870 33,870 33,870
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO i
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM)
M2### p 59,115 59,115 59,115 59,115 59,115 59,115 59,115
i
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ###
o 20,311 20,311 20,311 20,311 20,311 20,311 20,311
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,446 24,446 24,446 24,446 24,446 24,446 24,446
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2### 26,498 26,498 26,498 26,498 26,498 26,498 26,498
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2### 34,133 34,133 34,133 34,133 34,133 34,133 34,133
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,518 22,518 22,518 22,518 22,518 22,518 22,518
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 53,021 53,021 53,021 53,021 53,021 53,021 53,021
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2### 364,030 364,030 364,030 364,030 364,030 364,030 364,030
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2### 414,898 414,898 414,898 414,898 414,898 414,898 414,898
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2### 276,385 276,385 276,385 276,385 276,385 276,385 276,385
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2### 295,372 295,372 295,372 295,372 295,372 295,372 295,372

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3### 439,552 436,389 445,087 456,157 444,297 460,901 453,785
8.2 CONCRETO 3500 PSI M3### 382,801 379,895 387,888 398,061 387,161 402,419 395,880
8.3 CONCRETO 3000 PSI M3### 380,051 377,059 385,287 395,759 384,539 400,246 393,515
8.4 CONCRETO 2500 PSI M3### 334,638 331,561 340,024 350,795 339,255 355,410 348,487
8.5 CONCRETO 2000 PSI M3### 310,123 306,982 315,621 326,617 314,836 331,328 324,260
8.6 CONCRETO 1500 PSI M3### 279,058 275,853 284,668 295,888 283,867 300,696 293,484
8.7 MORTERO SECO 1:10 M3### 247,088 244,139 252,249 262,572 251,512 266,995 260,360
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3### 461,865 459,001 466,876 476,900 466,161 481,194 474,752
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3### 414,718 411,920 419,614 429,405 418,914 433,601 427,307
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3### 477,766 475,149 482,345 491,502 481,691 495,427 489,540
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3### 708,866 706,249 713,445 722,602 712,791 726,527 720,640

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 125,649 125,649 125,649 125,649 125,649 125,649 125,649
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,061 4,040 4,098 4,173 4,093 4,205 4,157
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2### 140,544 140,544 140,544 140,544 140,544 140,544 140,544
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2### 172,181 172,181 172,181 172,181 172,181 172,181 172,181
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 250,540 250,540 250,540 250,540 250,540 250,540 250,540
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 278,873 278,873 278,873 278,873 278,873 278,873 278,873
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 307,238 307,238 307,238 307,238 307,238 307,238 307,238
9.8 HOJA PUERTA FORTEC 0.81 UN ### 204,075 204,075 204,075 204,075 204,075 204,075 204,075
9.9 HOJA PUERTA FORTEC 0.91 UN ### 231,367 231,367 231,367 231,367 231,367 231,367 231,367
9.10 HOJA PUERTA FORTEC 1.50 UN ### 340,534 340,534 340,534 340,534 340,534 340,534 340,534
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 129,022 129,022 129,022 129,022 129,022 129,022 129,022
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### i 171,325 171,325 171,325 171,325 171,325 171,325 171,325
p
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ###
i 190,429 190,429 190,429 190,429 190,429 190,429 190,429
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### o 485,181 485,181 485,181 485,181 485,181 485,181 485,181
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,913 42,913 42,913 42,913 42,913 42,913 42,913
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,691 26,691 26,691 26,691 26,691 26,691 26,691
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2### 101,445 101,445 101,445 101,445 101,445 101,445 101,445
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 124,092 124,092 124,092 124,092 124,092 124,092 124,092
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 96,391 96,391 96,391 96,391 96,391 96,391 96,391
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,854 29,854 29,854 29,854 29,854 29,854 29,854
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,854 29,854 29,854 29,854 29,854 29,854 29,854
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,298 28,298 28,298 28,298 28,298 28,298 28,298
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2### 43,267 43,267 43,267 43,267 43,267 43,267 43,267
9.24 ESPEJO BISELADO INCOLORO 4 MM M2### 53,604 53,604 53,604 53,604 53,604 53,604 53,604
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2### 64,629 64,629 64,629 64,629 64,629 64,629 64,629
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2### 77,723 77,723 77,723 77,723 77,723 77,723 77,723
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2### 366,349 366,349 366,349 366,349 366,349 366,349 366,349
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2### 256,091 256,091 256,091 256,091 256,091 256,091 256,091
9.29 VIDRIO TRANSPARENTE 3 MM M2### 34,308 34,308 34,308 34,308 34,308 34,308 34,308
9.30 VIDRIO TRANSPARENTE 4 MM M2### 43,957 43,957 43,957 43,957 43,957 43,957 43,957
9.31 VIDRIO TRANSPARENTE 5 MM M2### 53,604 53,604 53,604 53,604 53,604 53,604 53,604
9.32 VIDRIO TRANSPARENTE 6 MM M2### 67,387 67,387 67,387 67,387 67,387 67,387 67,387

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 77,590 77,590 77,590 77,590 77,590 77,590 77,590
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2### 216,184 216,184 216,184 216,184 216,184 216,184 216,184
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO
10.3 DE 1" (INCLUYE ANTICORROSIVO) ML ### 82,095 82,095 82,095 82,095 82,095 82,095 82,095
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 146,741 146,741 146,741 146,741 146,741 146,741 146,741
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 139,213 139,213 139,213 139,213 139,213 139,213 139,213
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2### 91,397 91,397 91,397 91,397 91,397 91,397 91,397
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 215,497 215,497 215,497 215,497 215,497 215,497 215,497
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2### 112,199 112,199 112,199 112,199 112,199 112,199 112,199
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,728 6,728 6,728 6,728 6,728 6,728 6,728
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL
10.10 EN TUBO ESTRUCTURAL GALVANIZADO 2") M2### 101,145 101,145 101,145 101,145 101,145 101,145 101,145
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA
10,10(1) CLASICA) H: 2.00 MTS M2### 123,463 123,463 123,463 123,463 123,463 123,463 123,463
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC.
i
10.11 ANTICORROSIVO ML ### p 41,651 41,651 41,651 41,651 41,651 41,651 41,651
i
M2### o
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10.12 E=6MM 551,380 551,380 551,380 551,380 551,380 551,380 551,380
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2### 198,180 198,180 198,180 198,180 198,180 198,180 198,180

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA


10.14 ELECTROSTÁTICA M2### 222,187 222,187 222,187 222,187 222,187 222,187 222,187

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20


10.15 (INCLUYE PUERTAS Y ACCESORIOS)
M2### 502,610 502,610 502,610 502,610 502,610 502,610 502,610
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.
10.16 ANTICORROSIVO M2### 130,615 130,615 130,615 130,615 130,615 130,615 130,615
10.17 PUERTA CORTINA INCLUYE ESMALTE M2### 402,169 402,169 402,169 402,169 402,169 402,169 402,169
SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC.
10.18 ANTICORROSIVO ML ### 6,148 6,148 6,148 6,148 6,148 6,148 6,148
10.19 VENTANA EN ALUMINIO CORREDIZA M2### 282,693 282,693 282,693 282,693 282,693 282,693 282,693
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2### 124,385 124,385 124,385 124,385 124,385 124,385 124,385
10.21 REJILLA PISO 0.30 M M2### 87,962 87,962 87,962 87,962 87,962 87,962 87,962
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 90,769 90,769 90,769 90,769 90,769 90,769 90,769
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,748 10,748 10,748 10,748 10,748 10,748 10,748
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS
10.24 ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 11,932 11,932 11,932 11,932 11,932 11,932 11,932
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO,
MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR),


PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS,
10.25 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, KG ### 9,476 9,476 9,476 9,476 9,476 9,476 9,476
TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 224,869 224,869 224,869 224,869 224,869 224,869 224,869
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 271,434 271,434 271,434 271,434 271,434 271,434 271,434
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,507 22,507 22,507 22,507 22,507 22,507 22,507
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,352 35,352 35,352 35,352 35,352 35,352 35,352
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### i 33,893 33,893 33,893 33,893 33,893 33,893 33,893
p
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ###
i 43,473 43,473 43,473 43,473 43,473 43,473 43,473
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### o 89,691 89,691 89,691 89,691 89,691 89,691 89,691
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 226,261 226,261 226,261 226,261 226,261 226,261 226,261
11.9 INSTALACIÓN APARATO SANITARIO UN ### 44,314 44,314 44,314 44,314 44,314 44,314 44,314
11.10 INSTALACIÓN BOMBAS AGUA UN ### 616,334 616,334 616,334 616,334 616,334 616,334 616,334
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924 1,268,924
11.12 LLAVE MANGUERA UN ### 35,648 35,648 35,648 35,648 35,648 35,648 35,648
11.13 NIPLE PASAMURO 2" UN ### 67,706 67,706 67,706 67,706 67,706 67,706 67,706
11.14 NIPLE PASAMURO 4" UN ### 101,206 101,206 101,206 101,206 101,206 101,206 101,206
11.15 PUNTO AGUA CALIENTE CPVC UN ### 85,509 85,509 85,509 85,509 85,509 85,509 85,509
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 62,257 62,257 62,257 62,257 62,257 62,257 62,257
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 66,250 66,250 66,250 66,250 66,250 66,250 66,250
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 83,725 83,725 83,725 83,725 83,725 83,725 83,725
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 67,558 67,558 67,558 67,558 67,558 67,558 67,558
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 84,605 84,605 84,605 84,605 84,605 84,605 84,605
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 90,512 90,512 90,512 90,512 90,512 90,512 90,512
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 75,112 75,112 75,112 75,112 75,112 75,112 75,112
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,720 12,720 12,720 12,720 12,720 12,720 12,720
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,924 17,924 17,924 17,924 17,924 17,924 17,924
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,399 23,399 23,399 23,399 23,399 23,399 23,399
11.26 RED SUMINISTRO PVC 1" ML ### 14,444 14,444 14,444 14,444 14,444 14,444 14,444
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,623 8,623 8,623 8,623 8,623 8,623 8,623
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 52,157 52,157 52,157 52,157 52,157 52,157 52,157
11.29 RED SUMINISTRO PVC 2" ML ### 33,352 33,352 33,352 33,352 33,352 33,352 33,352
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,802 10,802 10,802 10,802 10,802 10,802 10,802
11.31 RED SANITARIA PVC-S 2" ML ### 25,750 25,750 25,750 25,750 25,750 25,750 25,750
11.32 RED SANITARIA PVC-S 3" ML ### 35,736 35,736 35,736 35,736 35,736 35,736 35,736
11.33 RED SANITARIA PVC-S 4" ML ### 48,503 48,503 48,503 48,503 48,503 48,503 48,503
11.34 RED SANITARIA PVC-S 6" ML ### 90,746 90,746 90,746 90,746 90,746 90,746 90,746
11.35 REGISTRO 1" UN ### 110,134 110,134 110,134 110,134 110,134 110,134 110,134
11.36 REGISTRO 1/2" UN ### 61,385 61,385 61,385 61,385 61,385 61,385 61,385
11.37 REGISTRO 3/4" UN ### 78,196 78,196 78,196 78,196 78,196 78,196 78,196
11.38 REGISTRO 1 1/2" UN ### 189,007 189,007 189,007 189,007 189,007 189,007 189,007
11.39 REGISTRO 2 1/2" UN ### 389,946 389,946 389,946 389,946 389,946 389,946 389,946
11.40 REGISTRO 2" UN ### 288,033 288,033 288,033 288,033 288,033 288,033 288,033
11.41 REVENTILACIÓN 2" ML ### 17,944 17,944 17,944 17,944 17,944 17,944 17,944
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
11.42 REVENTILACIÓN 3" ML ### i 22,650 22,650 22,650 22,650 22,650 22,650 22,650
p
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E i
11.43 INSTALACIÓN)
UN ### 176,196 176,196 176,196 176,196 176,196 176,196 176,196
o
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11.44 ISNTALACIÓN) UN ### 286,966 286,966 286,966 286,966 286,966 286,966 286,966

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E


11.45 INSTALACIÓN) UN ### 477,663 477,663 477,663 477,663 477,663 477,663 477,663

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE


11.46 ACCESORIOS Y SOPORTES) ML ### 41,308 41,308 41,308 41,308 41,308 41,308 41,308

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE


11.47 ACCESORIOS Y SOPORTES) ML ### 48,716 48,716 48,716 48,716 48,716 48,716 48,716

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE


11.48 ACCESORIOS Y SOPORTES)
ML ### 62,444 62,444 62,444 62,444 62,444 62,444 62,444

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE


11.49 ACCESORIOS Y SOPORTES) ML ### 70,873 70,873 70,873 70,873 70,873 70,873 70,873

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE


11.50 ACCESORIOS Y SOPORTES) ML ### 91,340 91,340 91,340 91,340 91,340 91,340 91,340

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE


11.51 ACCESORIOS Y SOPORTES) ML ### 105,643 105,643 105,643 105,643 105,643 105,643 105,643

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE


11.52 ACCESORIOS Y SOPORTES) ML ### 156,189 156,189 156,189 156,189 156,189 156,189 156,189
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,891 62,891 62,891 62,891 62,891 62,891 62,891
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 63,149 63,149 63,149 63,149 63,149 63,149 63,149
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 40,771 40,771 40,771 40,771 40,771 40,771 40,771
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 50,268 50,268 50,268 50,268 50,268 50,268 50,268
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE
11.57 HASTA 2" ML ### 4,262 4,262 4,262 4,262 4,262 4,262 4,262

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO


11.58 MAYOR A 2" ML ### 6,721 6,721 6,721 6,721 6,721 6,721 6,721

11.59 GABINETE TIPO III UN ### 1,037,892 1,037,892 1,037,892 1,037,892 1,037,892 1,037,892 1,037,892
11.60 GABINETE TIPO I UN ### 792,538 792,538 792,538 792,538 792,538 792,538 792,538
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,668,146 2,668,146 2,668,146 2,668,146 2,668,146 2,668,146 2,668,146
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,224,293 2,224,293 2,224,293 2,224,293 2,224,293 2,224,293 2,224,293
11.63 VÁLVULA MARIPOSA 3" UN ### 644,944 644,944 644,944 644,944 644,944 644,944 644,944
11.64 VÁLVULA MARIPOSA 4" UN ### 834,895 834,895 834,895 834,895 834,895 834,895 834,895
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### i 321,775 321,775 321,775 321,775 321,775 321,775 321,775
p
i
12 INSTALACIONES ELÉCTRICAS o
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 371,509 371,509 371,509 371,509 371,509 371,509 371,509
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,033 59,033 59,033 59,033 59,033 59,033 59,033
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 69,893 69,893 69,893 69,893 69,893 69,893 69,893
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 77,590 77,590 77,590 77,590 77,590 77,590 77,590
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 91,398 91,398 91,398 91,398 91,398 91,398 91,398
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,492 55,492 55,492 55,492 55,492 55,492 55,492
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 63,256 63,256 63,256 63,256 63,256 63,256 63,256
12.8 STRIP TELEFÓNICO 10 PARES UN ### 145,929 145,929 145,929 145,929 145,929 145,929 145,929
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 56,986 56,986 56,986 56,986 56,986 56,986 56,986
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 130,979 130,979 130,979 130,979 130,979 130,979 130,979
12.11 SALIDA T.V PVC COMPLETA. UN ### 78,308 78,308 78,308 78,308 78,308 78,308 78,308
12.12 SALIDA BIFÁSICA C.N. UN ### 46,441 46,441 46,441 46,441 46,441 46,441 46,441
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 97,838 97,838 97,838 97,838 97,838 97,838 97,838
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 417,708 417,708 417,708 417,708 417,708 417,708 417,708
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 556,470 556,470 556,470 556,470 556,470 556,470 556,470
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,604 3,604 3,604 3,604 3,604 3,604 3,604
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,758 4,758 4,758 4,758 4,758 4,758 4,758
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,405 7,405 7,405 7,405 7,405 7,405 7,405
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,242 13,242 13,242 13,242 13,242 13,242 13,242
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 278,288 278,288 278,288 278,288 278,288 278,288 278,288
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 78,601 78,601 78,601 78,601 78,601 78,601 78,601
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 106,463 106,463 106,463 106,463 106,463 106,463 106,463
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 43,351 43,351 43,351 43,351 43,351 43,351 43,351
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,425,766 1,425,766 1,425,766 1,425,766 1,425,766 1,425,766 1,425,766
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,056,563 1,056,563 1,056,563 1,056,563 1,056,563 1,056,563 1,056,563
12.26 POSTE METÁLICO 6M UN ### 1,322,974 1,322,974 1,322,974 1,322,974 1,322,974 1,322,974 1,322,974
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE
12.27 LUMINARIA) UN ### 615,904 615,904 615,904 615,904 615,904 615,904 615,904
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 112,317 112,317 112,317 112,317 112,317 112,317 112,317
12.29 LUMINARIA 70W SODIO UN ### 516,786 516,786 516,786 516,786 516,786 516,786 516,786
12.30 LUMINARIA 150W SODIO UN ### 646,594 646,594 646,594 646,594 646,594 646,594 646,594
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,708,141 1,708,141 1,708,141 1,708,141 1,708,141 1,708,141 1,708,141
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,257,825 1,257,825 1,257,825 1,257,825 1,257,825 1,257,825 1,257,825
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
13 PISOS BASES i
p
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2###
i 40,174 40,073 40,350 40,702 40,324 40,853 40,626
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2### o 39,952 39,851 40,128 40,480 40,103 40,631 40,405
13.3 ALISTADO PARA LISTÓN M2### 14,873 14,853 14,908 14,978 14,903 15,009 14,963
13.4 ALISTADO PISOS 1:3, E=0.04 M2### 27,969 27,768 28,321 29,026 28,271 29,327 28,875
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2### 86,356 86,154 86,708 87,412 86,657 87,714 87,261
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 26,501 26,438 26,611 26,831 26,595 26,925 26,783
13.7 CONCRETO BASE GRADAS 2500 PSI M2### 56,264 55,956 56,802 57,879 56,725 58,341 57,649
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2### 77,594 77,102 78,456 80,180 78,333 80,918 79,810
13.9 MANTO FIBERGLASS 600X1 M2### 31,067 31,067 31,067 31,067 31,067 31,067 31,067
13.10 PEGANTE MORTERO-CONCRETO M2### 23,436 23,436 23,436 23,436 23,436 23,436 23,436
13.11 PERMA PLY 2 CAPAS M2### 27,488 27,488 27,488 27,488 27,488 27,488 27,488
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2### 45,612 45,335 46,097 47,066 46,027 47,481 46,858
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2### 53,346 53,008 53,939 55,124 53,854 55,631 54,870
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2### 77,120 76,597 78,036 79,867 77,905 80,651 79,475
13.15 TRITURADO FINO 1/2 M3### 83,279 81,077 87,131 94,835 86,581 98,136 93,184
13.16 TRITURADO GRUESO 3/4 M3### 90,103 85,835 92,598 103,957 94,914 108,767 103,740

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2### 58,416 58,376 58,486 58,627 58,476 58,688 58,597
BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA
14.2 (LINEAL) ML ### 34,880 34,860 34,916 34,986 34,911 35,016 34,971
14.3 ADOQUÍN CONCRETO 6CM M2### 66,571 66,470 66,747 67,099 66,722 67,250 67,023
14.4 ADOQUÍN CONCRETO 8CM M2### 69,971 69,870 70,147 70,499 70,122 70,650 70,423
14.5 ADOQUÍN GRES PEATONAL M2### 74,359 74,258 74,535 74,887 74,510 75,038 74,812
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE
14.6 FONDO BLANCO. INCLUYE ALISTADO M2### 77,148 77,107 77,218 77,359 77,208 77,419 77,329
14.7 GRAVILLA PARA GRADAS ML ### 37,500 37,458 37,572 37,718 37,562 37,780 37,687
ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y
14.8 PULIDA)
M2### 167,686 167,505 168,003 168,637 167,958 168,908 168,501
14.9 ACABADO EN GRAVILLA LAVADA M2### 46,626 46,522 46,806 47,167 46,780 47,322 47,090
14.10 GUARDAESCOBA EN GRANITO ML ### 44,719 44,719 44,719 44,719 44,719 44,719 44,719
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,128 10,086 10,200 10,345 10,190 10,408 10,314
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,644 9,644 9,644 9,644 9,644 9,644 9,644
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,950 12,950 12,950 12,950 12,950 12,950 12,950
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,776 10,776 10,776 10,776 10,776 10,776 10,776
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,083 18,083 18,083 18,083 18,083 18,083 18,083
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,277 35,277 35,277 35,277 35,277 35,277 35,277
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### i 9,392 9,392 9,392 9,392 9,392 9,392 9,392
p
14.18 LISTÓN M.H. AMARILLO M2###
i 76,224 76,224 76,224 76,224 76,224 76,224 76,224
14.19 PASO ESCALERA GRANITO ML ### o 120,900 120,759 121,147 121,640 121,112 121,851 121,534
14.20 PIRLANES ALUMINIO ML ### 7,667 7,667 7,667 7,667 7,667 7,667 7,667
14.21 PIRLANES LADRILLO ML ### 32,716 32,673 32,790 32,940 32,780 33,004 32,908
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2### 47,129 47,129 47,129 47,129 47,129 47,129 47,129
14.23 PISO VINILO TRÁFICO PESADO M2### 54,794 54,794 54,794 54,794 54,794 54,794 54,794
14.24 PULIDA LACADA PISO MADERA M2### 50,344 50,344 50,344 50,344 50,344 50,344 50,344
14.25 TABLETA DE GRES 25X25 M2### 50,639 50,599 50,709 50,850 50,699 50,911 50,820
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2### 56,880 56,840 56,950 57,091 56,940 57,152 57,061
GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO
14.27 BLANCO ML ### 11,169 11,169 11,169 11,169 11,169 11,169 11,169
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2### 50,818 50,754 50,930 51,154 50,914 51,251 51,106
14.29 JABONERA PORCELANA ACUARIO UN ### 21,164 21,164 21,164 21,164 21,164 21,164 21,164
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 126,743 126,743 126,743 126,743 126,743 126,743 126,743
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,150 10,150 10,150 10,150 10,150 10,150 10,150
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,090 23,090 23,090 23,090 23,090 23,090 23,090
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,790 14,790 14,790 14,790 14,790 14,790 14,790
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,367 14,367 14,367 14,367 14,367 14,367 14,367
14.35 REMATES BOCEL ALUMINIO ML ### 8,715 8,715 8,715 8,715 8,715 8,715 8,715
14.36 REMATES BOCEL PORCELANA ML ### 8,869 8,869 8,869 8,869 8,869 8,869 8,869
14.37 TAPA REGISTRO 20X20 UN ### 19,552 19,552 19,552 19,552 19,552 19,552 19,552
14.38 TAPA REGISTRO 6X6 UN ### 17,812 17,812 17,812 17,812 17,812 17,812 17,812
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE
14.39 MÁRMOL N.5 M2### 19,241 19,241 19,241 19,241 19,241 19,241 19,241

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE


14.40 MÁRMOL FUNDIDO EN SITIO M2### 22,243 22,243 22,243 22,243 22,243 22,243 22,243

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2### 66,879 66,839 66,950 67,090 66,940 67,151 67,060
14.42 MEDIA CAÑA EN GRANITO ML ### 79,715 79,715 79,715 79,715 79,715 79,715 79,715
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2### 34,712 34,712 34,712 34,712 34,712 34,712 34,712
14.44 PINTURA ACRÍLICA PARA PISOS M2### 13,599 13,599 13,599 13,599 13,599 13,599 13,599
PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS
14.45 DEPORTIVOS
M2### 104,785 104,785 104,785 104,785 104,785 104,785 104,785
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2### 126,762 126,762 126,762 126,762 126,762 126,762 126,762

15 CIELO RASO
15.1 APLIQUE YESO ML ### 74,886 74,886 74,886 74,886 74,886 74,886 74,886
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
15.2 ARMADURA MADERA Y MALLA M2### i 36,654 36,654 36,654 36,654 36,654 36,654 36,654
p
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2###
i 56,796 56,796 56,796 56,796 56,796 56,796 56,796
15.4 CIELO RASO DURACUSTIC M2### o 69,748 69,748 69,748 69,748 69,748 69,748 69,748
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2### 52,037 52,037 52,037 52,037 52,037 52,037 52,037
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2### 96,587 96,587 96,587 96,587 96,587 96,587 96,587
15.7 CORNISAS YESO ML ### 50,279 50,279 50,279 50,279 50,279 50,279 50,279
LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE
15.8 APOYO) M2### 106,812 106,812 106,812 106,812 106,812 106,812 106,812
15.9 MALLA CON VENA M2### 13,720 13,720 13,720 13,720 13,720 13,720 13,720

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3### 5,627 5,627 5,627 5,627 5,627 5,627 5,627
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE
16.2 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 18,479 18,479 18,479 18,479 18,479 18,479 18,479
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3### 25,905 25,905 25,905 25,905 25,905 25,905 25,905
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M
16.4 (INCLUYE M3### 43,707 43,707 43,707 43,707 43,707 43,707 43,707
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M
16.5 (INCLUYE M3### 49,987 49,987 49,987 49,987 49,987 49,987 49,987
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN
16.6 EXPLOSIVOS) M3### 85,005 85,005 85,005 85,005 85,005 85,005 85,005

RELLENO CON MATERIAL DEL SITIO COMPACTADO


16.7 MECÁNICAMENTE M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114

16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3### 84,692 74,411 81,265 101,826 93,259 110,393 106,966
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3### 88,657 86,306 92,771 100,999 92,184 104,525 99,236
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3### 110,679 124,386 122,672 160,367 143,233 129,526 115,819
16.11 AFRIMADO (NORMA INVIAS 311) M3### 80,032 69,751 76,605 97,166 88,599 105,733 102,306
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3### 105,151 118,858 117,144 154,839 137,705 123,998 110,291
16.13 BASE GRANULAR (NORMA INVIAS 330) M3### 107,648 121,355 119,642 157,336 140,202 126,495 112,788

17 APARATOS SANITARIOS
SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE
17.1 GRIFERÍA) UN ### 310,409 310,409 310,409 310,409 310,409 310,409 310,409
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 UN ### p 915,816 915,816 915,816 915,816 915,816 915,816 915,816
GRIFERÍA) i
o
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE
17.3 GRIFERÍA) UN ### 496,051 496,051 496,051 496,051 496,051 496,051 496,051

SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE


17.4 GRIFERÍA) UN ### 143,458 143,458 143,458 143,458 143,458 143,458 143,458

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE


17.5 GRIFERÍA) UN ### 201,106 201,106 201,106 201,106 201,106 201,106 201,106

SUMINISTRO E INSTALACIÓN LAVAMANOS DE


17.6 EMPOTRAR(INCLUYE GRIFERÍA) UN ### 186,736 186,736 186,736 186,736 186,736 186,736 186,736

SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE


17.7 GRIFERÍA)
UN ### 411,583 411,583 411,583 411,583 411,583 411,583 411,583

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE


17.8 GRIFERÍA) UN ### 1,053,286 1,053,286 1,053,286 1,053,286 1,053,286 1,053,286 1,053,286

SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE


17.9 GRIFERÍA) UN ### 298,867 298,867 298,867 298,867 298,867 298,867 298,867

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA


17.10 A BAÑERA UN ### 211,551 211,551 211,551 211,551 211,551 211,551 211,551

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 83,944 83,944 83,944 83,944 83,944 83,944 83,944
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN
17.12 ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y UN ### 256,291 256,291 256,291 256,291 256,291 256,291 256,291
GRIFERÍA)
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN
17.13 ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y UN ### 377,740 377,740 377,740 377,740 377,740 377,740 377,740
GRIFERÍA)

18 PINTURAS
IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O
18.1 SIMILAR
M2### 8,501 8,501 8,501 8,501 8,501 8,501 8,501
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,156 3,156 3,156 3,156 3,156 3,156 3,156
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2### 11,303 11,303 11,303 11,303 11,303 11,303 11,303
18.4 BARNIZ SOBRE MUEBLES M2### 43,113 43,113 43,113 43,113 43,113 43,113 43,113
18.5 CARBURO SOBRE PAÑETES M2### 5,927 5,927 5,927 5,927 5,927 5,927 5,927
18.6 COLORPLAST FACHADA SOBRE FACHADA M2### 67,512 67,512 67,512 67,512 67,512 67,512 67,512
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,521 3,521 3,521 3,521 3,521 3,521 3,521
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### i 2,830 2,830 2,830 2,830 2,830 2,830 2,830
p
18.9 ESMALTE SOBRE LÁMINA LLENA M2###
i 14,188 14,188 14,188 14,188 14,188 14,188 14,188
18.10 ESMALTE SOBRE MADERA LINEAL ML ### o 4,113 4,113 4,113 4,113 4,113 4,113 4,113
18.11 ESMALTE SOBRE MADERA LLENA M2### 14,962 14,962 14,962 14,962 14,962 14,962 14,962
18.12 ESMALTE SOBRE MARCOS LÁMINA M2### 5,877 5,877 5,877 5,877 5,877 5,877 5,877
18.13 ESMALTE SOBRE MARCOS MADERA M2### 6,683 6,683 6,683 6,683 6,683 6,683 6,683
18.14 ESTUCO M2### 7,120 7,120 7,120 7,120 7,120 7,120 7,120
18.15 ESTUCO (LINEAL) ML ### 4,455 4,455 4,455 4,455 4,455 4,455 4,455
18.16 ESTUCO Y VINILO 3 MANOS M2### 15,785 15,785 15,785 15,785 15,785 15,785 15,785
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,771 9,771 9,771 9,771 9,771 9,771 9,771
18.18 LACA PISOS MADERA M2### 23,095 23,095 23,095 23,095 23,095 23,095 23,095
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,730 2,730 2,730 2,730 2,730 2,730 2,730
18.20 MARMOLINA SOBRE PAÑETE M2### 12,446 12,446 12,446 12,446 12,446 12,446 12,446
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,356 3,356 3,356 3,356 3,356 3,356 3,356
18.22 TINTILLA SOBRE MADERA LLENA M2### 12,825 12,825 12,825 12,825 12,825 12,825 12,825
18.23 VINILO SOBRE PAÑETE 2 MANOS M2### 7,208 7,208 7,208 7,208 7,208 7,208 7,208
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,524 4,524 4,524 4,524 4,524 4,524 4,524
18.25 WASH-PRIMER SOBRE ALUMNIO M2### 22,278 22,278 22,278 22,278 22,278 22,278 22,278
18.26 PINTURA EPÓXICA M2### 12,885 12,885 12,885 12,885 12,885 12,885 12,885
18.27 PINTURA EPÓXICA (LINEAL) ML ### 7,952 7,952 7,952 7,952 7,952 7,952 7,952

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,239,534 6,239,534 6,239,534 6,239,534 6,239,534 6,239,534 6,239,534
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 11,024,273 11,024,273 ### 11,024,273 11,024,273 11,024,273 ###
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,885,012 2,885,012 2,885,012 2,885,012 2,885,012 2,885,012 2,885,012
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO
19.4 (PAR) UN ### 9,428,536 9,428,536 9,428,536 9,428,536 9,428,536 9,428,536 9,428,536
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,829,854 8,829,854 8,829,854 8,829,854 8,829,854 8,829,854 8,829,854
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,730 2,730 2,730 2,730 2,730 2,730 2,730
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 885,107 885,107 885,107 885,107 885,107 885,107 885,107
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 88,486 88,486 88,486 88,486 88,486 88,486 88,486
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,602,016 1,601,984 1,602,071 1,602,182 1,602,064 1,602,230 1,602,158
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 686,935 686,187 688,244 690,862 688,057 691,984 690,301

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,961 29,961 29,961 29,961 29,961 29,961 29,961
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,612 44,612 44,612 44,612 44,612 44,612 44,612
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### i 55,341 55,341 55,341 55,341 55,341 55,341 55,341
p
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20.4 ACCESORIOS) ML ### i 17,966 17,966 17,966 17,966 17,966 17,966 17,966
o
TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE
20.5 ACCESORIOS) ML ### 21,788 21,788 21,788 21,788 21,788 21,788 21,788
TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE
20.6 ACCESORIOS) ML ### 29,738 29,738 29,738 29,738 29,738 29,738 29,738
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,488 26,488 26,488 26,488 26,488 26,488 26,488
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,931 27,931 27,931 27,931 27,931 27,931 27,931
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,958 34,958 34,958 34,958 34,958 34,958 34,958
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,080 18,080 18,080 18,080 18,080 18,080 18,080
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,713 23,713 23,713 23,713 23,713 23,713 23,713
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,504 36,504 36,504 36,504 36,504 36,504 36,504
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 280,152 280,152 280,152 280,152 280,152 280,152 280,152
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 322,471 322,471 322,471 322,471 322,471 322,471 322,471
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 336,260 336,260 336,260 336,260 336,260 336,260 336,260
20.16 ACOMETIDA GAS 1/2" ML ### 311,725 311,725 311,725 311,725 311,725 311,725 311,725

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 227,588 227,588 227,588 227,588 227,588 227,588 227,588
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 34,924 34,924 34,924 34,924 34,924 34,924 34,924
21.3 SIRENA DE 110 V UN ### 106,117 106,117 106,117 106,117 106,117 106,117 106,117
21.4 CÁMARA CCTV UN ### 268,455 268,455 268,455 268,455 268,455 268,455 268,455
21.5 PARLANTE-CIELO FALSO UN ### 53,158 53,158 53,158 53,158 53,158 53,158 53,158
21.6 AMPLIFICADOR 100W UN ### 587,832 587,832 587,832 587,832 587,832 587,832 587,832
21.7 AMPLIFICADOR 300W UN ### 1,459,820 1,459,820 1,459,820 1,459,820 1,459,820 1,459,820 1,459,820
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 45,297 45,297 45,297 45,297 45,297 45,297 45,297
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 227,776 227,776 227,776 227,776 227,776 227,776 227,776
21.10 TOMA PARA MICRÓFONO UN ### 44,853 44,853 44,853 44,853 44,853 44,853 44,853
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,852 3,852 3,852 3,852 3,852 3,852 3,852
21.12 SPLITERS UN ### 6,487 6,487 6,487 6,487 6,487 6,487 6,487
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 18,907 18,907 18,907 18,907 18,907 18,907 18,907
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 24,796 24,796 24,796 24,796 24,796 24,796 24,796
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 32,215 32,215 32,215 32,215 32,215 32,215 32,215
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 125,989 125,989 125,989 125,989 125,989 125,989 125,989
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO
21.17 30X120 ML ### 32,865 32,865 32,865 32,865 32,865 32,865 32,865

21.18 BANDEJA PORTACABLES PARA RACK UN ### 107,581 107,581 107,581 107,581 107,581 107,581 107,581
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
21.19 RACK 2' X 24" UN ### i 187,324 187,324 187,324 187,324 187,324 187,324 187,324
p
21.20 RACK 3' X 24" UN ###
i 295,127 295,127 295,127 295,127 295,127 295,127 295,127
21.21 RACK 5' X 24" UN ### o 366,272 366,272 366,272 366,272 366,272 366,272 366,272
21.22 RACK 7' X 24" UN ### 400,387 400,387 400,387 400,387 400,387 400,387 400,387
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 585,307 585,307 585,307 585,307 585,307 585,307 585,307
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 344,490 344,490 344,490 344,490 344,490 344,490 344,490
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y
21.25 MARCACIÓN) UN ### 106,773 106,773 106,773 106,773 106,773 106,773 106,773
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,237 14,237 14,237 14,237 14,237 14,237 14,237
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,111 29,111 29,111 29,111 29,111 29,111 29,111
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,111 5,111 5,111 5,111 5,111 5,111 5,111
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,960 35,960 35,960 35,960 35,960 35,960 35,960
21.30 CANALETA METÁLICA 4X10 CMS ML ### 37,587 37,587 37,587 37,587 37,587 37,587 37,587
21.31 CANALETA METÁLICA 6X10 CMS ML ### 38,398 38,398 38,398 38,398 38,398 38,398 38,398
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,044 25,044 25,044 25,044 25,044 25,044 25,044
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,719 27,719 27,719 27,719 27,719 27,719 27,719
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,842 28,842 28,842 28,842 28,842 28,842 28,842
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 48,596 48,596 48,596 48,596 48,596 48,596 48,596
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 629,452 629,452 629,452 629,452 629,452 629,452 629,452
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 323,007 323,007 323,007 323,007 323,007 323,007 323,007
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 90,251 90,251 90,251 90,251 90,251 90,251 90,251
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,875 1,875 1,875 1,875 1,875 1,875 1,875
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,660 8,660 8,660 8,660 8,660 8,660 8,660
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,937 12,937 12,937 12,937 12,937 12,937 12,937
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,609 21,609 21,609 21,609 21,609 21,609 21,609
21.43 CABLE TELEVISIÓN RG6 ML ### 3,997 3,997 3,997 3,997 3,997 3,997 3,997
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 22,634 22,634 22,634 22,634 22,634 22,634 22,634
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 32,986 32,986 32,986 32,986 32,986 32,986 32,986
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,711 19,711 19,711 19,711 19,711 19,711 19,711
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN) ML ### 15,712 15,712 15,712 15,712 15,712 15,712 15,712

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 636,021 636,021 636,021 636,021 636,021 636,021 636,021
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### o 9,712 9,712 9,712 9,712 9,712 9,712 9,712
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 93,087 93,087 93,087 93,087 93,087 93,087 93,087
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 524,463 524,463 524,463 524,463 524,463 524,463 524,463
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,119,424 1,119,424 1,119,424 1,119,424 1,119,424 1,119,424 1,119,424
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 128,297 128,297 128,297 128,297 128,297 128,297 128,297
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 781,748 781,748 781,748 781,748 781,748 781,748 781,748
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,682,523 1,682,523 1,682,523 1,682,523 1,682,523 1,682,523 1,682,523
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,376 13,376 13,376 13,376 13,376 13,376 13,376
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,510 16,510 16,510 16,510 16,510 16,510 16,510
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,745 20,745 20,745 20,745 20,745 20,745 20,745
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,710 22,710 22,710 22,710 22,710 22,710 22,710
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,236 27,236 27,236 27,236 27,236 27,236 27,236
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,236 27,236 27,236 27,236 27,236 27,236 27,236
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 109,665 109,665 109,665 109,665 109,665 109,665 109,665
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 127,018 127,018 127,018 127,018 127,018 127,018 127,018
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 393,113 393,113 393,113 393,113 393,113 393,113 393,113
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 147,628 147,628 147,628 147,628 147,628 147,628 147,628
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 243,362 243,362 243,362 243,362 243,362 243,362 243,362
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,077,046 1,077,046 1,077,046 1,077,046 1,077,046 1,077,046 1,077,046
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,240,933 1,240,933 1,240,933 1,240,933 1,240,933 1,240,933 1,240,933
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,526 14,526 14,526 14,526 14,526 14,526 14,526
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,813 12,813 12,813 12,813 12,813 12,813 12,813
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,723 31,723 31,723 31,723 31,723 31,723 31,723
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 125,762 125,762 125,762 125,762 125,762 125,762 125,762
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 187,330 187,330 187,330 187,330 187,330 187,330 187,330
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,589 30,589 30,589 30,589 30,589 30,589 30,589
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 105,413 105,413 105,413 105,413 105,413 105,413 105,413
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 156,258 156,258 156,258 156,258 156,258 156,258 156,258
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,927 30,927 30,927 30,927 30,927 30,927 30,927
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 63,782 63,782 63,782 63,782 63,782 63,782 63,782
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 256,994 256,994 256,994 256,994 256,994 256,994 256,994
1.32 UNIÓN REPARACION PVC 4" UN ### 74,426 74,426 74,426 74,426 74,426 74,426 74,426
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 299,024 299,024 299,024 299,024 299,024 299,024 299,024
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 179,149 179,149 179,149 179,149 179,149 179,149 179,149
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 510,282 510,282 510,282 510,282 510,282 510,282 510,282
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### i 1,367,283 1,367,283 1,367,283 1,367,283 1,367,283 1,367,283 1,367,283
p
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ###
i 2,020,337 2,020,337 2,020,337 2,020,337 2,020,337 2,020,337 2,020,337
o
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2### 10,904 10,904 10,904 10,904 10,904 10,904 10,904
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2### 24,905 24,905 24,905 24,905 24,905 24,905 24,905
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3### 19,114 19,114 19,114 19,114 19,114 19,114 19,114
2.4 RELLENO TIPO 1 "GRAVILLA" M3### 70,276 68,032 74,203 82,057 73,642 85,422 80,374
2.5 RELLENO TIPO 2 "RECEBO" M3### 79,657 69,377 76,230 96,791 88,224 105,358 101,931
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3### 85,091 74,811 81,664 102,225 93,658 110,792 107,365
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3### 85,249 93,448 92,423 114,970 104,721 96,522 88,323
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3### 62,291 70,649 69,605 92,589 82,142 73,784 65,426
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3### 95,590 92,812 100,452 110,176 99,758 114,343 108,092

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 117,233 117,233 117,233 117,233 117,233 117,233 117,233
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,222,652 1,222,652 1,222,652 1,222,652 1,222,652 1,222,652 1,222,652
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### 153,216 153,216 153,216 153,216 153,216 153,216 153,216
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,416,151 1,416,151 1,416,151 1,416,151 1,416,151 1,416,151 1,416,151
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 987,014 987,014 987,014 987,014 987,014 987,014 987,014
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,946 62,946 62,946 62,946 62,946 62,946 62,946
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 116,376 116,376 116,376 116,376 116,376 116,376 116,376
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 274,841 274,841 274,841 274,841 274,841 274,841 274,841
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 274,834 274,834 274,834 274,834 274,834 274,834 274,834
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 441,258 441,258 441,258 441,258 441,258 441,258 441,258
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 116,425 116,425 116,425 116,425 116,425 116,425 116,425
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 116,425 116,425 116,425 116,425 116,425 116,425 116,425
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 274,841 274,841 274,841 274,841 274,841 274,841 274,841
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 274,841 274,841 274,841 274,841 274,841 274,841 274,841
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 441,258 441,258 441,258 441,258 441,258 441,258 441,258
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 442,842 442,842 442,842 442,842 442,842 442,842 442,842
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 719,252 719,252 719,252 719,252 719,252 719,252 719,252
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,154,434 1,154,434 1,154,434 1,154,434 1,154,434 1,154,434 1,154,434
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 71,327 71,327 71,327 71,327 71,327 71,327 71,327
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 370,519 370,519 370,519 370,519 370,519 370,519 370,519
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 415,631 415,631 415,631 415,631 415,631 415,631 415,631
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,150,299 1,150,299 1,150,299 1,150,299 1,150,299 1,150,299 1,150,299
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### i 67,250 67,222 67,300 67,401 67,293 67,444 67,379
p
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ###
i 335,861 335,861 335,861 335,861 335,861 335,861 335,861
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### o 51,121 51,121 51,121 51,121 51,121 51,121 51,121
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 72,316 72,316 72,316 72,316 72,316 72,316 72,316
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 104,374 104,374 104,374 104,374 104,374 104,374 104,374
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 160,224 160,224 160,224 160,224 160,224 160,224 160,224
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 257,534 257,534 257,534 257,534 257,534 257,534 257,534
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 373,569 373,569 373,569 373,569 373,569 373,569 373,569
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 472,775 472,775 472,775 472,775 472,775 472,775 472,775
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 621,636 621,636 621,636 621,636 621,636 621,636 621,636
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 855,161 855,161 855,161 855,161 855,161 855,161 855,161

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI
4.1 CON REFUERZO) UN ### 665,629 663,834 668,771 675,054 668,322 677,746 673,708

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.


4.2 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 654,950 653,667 657,193 661,680 656,873 663,604 660,719

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON


4.3 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 715,610 714,414 717,705 721,894 717,406 723,688 720,996

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000


4.4 PSI CON REFUERZO) UN ### 789,972 787,728 793,899 801,753 793,338 805,118 800,070

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.


4.5 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 931,019 929,213 934,178 940,497 933,727 943,205 939,143
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4.6 REFUERZO (INCLUYE ARO Y TAPA HF)
UN ### 824,242 822,596 827,121 832,881 826,710 835,349 831,647
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 998,279 997,374 999,865 1,003,041 999,640 1,004,401 1,002,361
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,439,353 1,436,765 1,443,885 1,452,954 1,443,239 1,456,840 1,451,011
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,963,711 1,958,944 1,972,056 1,988,745 1,970,864 1,995,895 1,985,167
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,593,400 2,585,476 2,607,272 2,635,014 2,605,290 2,646,898 2,629,067
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,869,307 1,869,307 1,869,307 1,869,307 1,869,307 1,869,307 1,869,307
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,956,619 3,956,619 3,956,619 3,956,619 3,956,619 3,956,619 3,956,619
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 140,072 140,019 140,163 140,346 140,150 140,425 140,307

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2### 74,393 74,244 74,655 75,179 74,618 75,403 75,066
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2### 88,173 88,024 88,435 88,959 88,398 89,183 88,846
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2### i 54,209 53,886 54,774 55,905 54,694 56,390 55,663
p
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2###
i 58,977 58,663 59,527 60,627 59,448 61,098 60,391
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2### o 59,266 58,961 59,800 60,868 59,724 61,326 60,639
5.6 BORDE SEPARADOR VERDE A-170 ML ### 258,540 258,488 258,632 258,815 258,619 258,894 258,776
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,253 18,214 18,321 18,456 18,311 18,514 18,427
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 38,799 38,572 39,198 39,995 39,141 40,337 39,824
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 84,645 84,617 84,694 84,792 84,687 84,834 84,771
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 559,674 558,963 560,918 563,406 560,740 564,472 562,873
5.11 LOSETA PREFABRICADA A-40 M2### 62,895 62,775 63,104 63,523 63,074 63,703 63,433
5.12 LOSETA PREFABRICADA A-60 M2### 91,737 91,618 91,947 92,366 91,917 92,546 92,276
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE
5.13 3000 PSI ML ### 32,783 32,657 33,003 33,443 32,971 33,631 33,348

SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000


5.14 PSI
ML ### 52,393 52,139 52,839 53,729 52,775 54,110 53,538
5.15 SARDINEL PREFABRICADO A-10 ML ### 95,203 96,767 96,645 101,120 99,026 97,580 95,925
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2### 60,791 60,719 60,918 61,172 60,900 61,280 61,117

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 205,258 205,108 205,520 206,043 205,482 206,267 205,931
6.2 BANCA EN CONCRETO M-30 UN ### 677,142 676,933 677,509 678,242 677,457 678,556 678,085
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 218,107 218,076 218,162 218,272 218,155 218,319 218,249
6.4 BOLARDO M-60 CONCRETO UN ### 163,047 162,867 163,361 163,989 163,316 164,259 163,855
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 164,915 164,735 165,229 165,857 165,184 166,126 165,722
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 193,676 193,488 194,006 194,666 193,959 194,948 194,524
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 59,447 59,332 59,647 60,048 59,619 60,220 59,962
6.8 BORDILLO PREFABRICADO A-80 ML ### 69,088 68,960 69,312 69,761 69,280 69,953 69,665
6.9 CANECA M-120 UN ### 317,537 317,509 317,587 317,688 317,580 317,731 317,666
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 836,575 836,485 836,732 837,046 836,709 837,181 836,979
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,437,998 3,437,938 3,438,102 3,438,312 3,438,087 3,438,401 3,438,267
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,536,773 3,536,713 3,536,877 3,537,087 3,536,862 3,537,176 3,537,042
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 493,918 493,855 494,028 494,247 494,012 494,342 494,200
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 653,003 652,752 653,443 654,323 653,380 654,700 654,134
6.15 BANCA EN MADERA M-50 UN ### 543,921 543,921 543,921 543,921 543,921 543,921 543,921
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 250,995 250,905 251,152 251,466 251,130 251,601 251,399
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 585,653 585,582 585,779 586,029 585,761 586,137 585,975
6.18 POSTE HISTÓRICO M-131 UN ### 6,532,890 6,532,441 6,533,676 6,535,246 6,533,563 6,535,919 6,534,910
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
7 SEÑALIZACIÓN i
p
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ###
i 4,108 4,108 4,108 4,108 4,108 4,108 4,108
7.2 MARCA VIAL CON PINTURA EN FRÍO M2### o 43,988 43,988 43,988 43,988 43,988 43,988 43,988
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 318,728 318,702 318,774 318,866 318,768 318,905 318,846
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 501,096 500,970 501,316 501,755 501,284 501,944 501,661
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 237,961 237,935 238,007 238,099 238,001 238,138 238,079
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 252,781 252,755 252,827 252,919 252,821 252,958 252,899
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 264,003 263,977 264,049 264,141 264,043 264,180 264,121
7.8 TACHAS REFLECTIVAS UN ### 13,763 13,763 13,763 13,763 13,763 13,763 13,763
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,701 14,701 14,701 14,701 14,701 14,701 14,701
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M
7.10 (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 119,768 119,768 119,768 119,768 119,768 119,768 119,768
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
VÍAS (SEGÚNpESPECIFICACIONES TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y o
1.1 201 P RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3### 152,777 152,777 152,777 152,777 152,777 152,777 152,777
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO
1.2 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM) M3### 53,673 53,673 53,673 53,673 53,673 53,673 53,673
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO
1.3 200.1 DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971 2,613,971
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE
1.4 200.2 CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 933,801 933,801 933,801 933,801 933,801 933,801 933,801
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM) M3### 89,524 89,524 89,524 89,524 89,524 89,524 89,524
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,318 1,318 1,318 1,318 1,318 1,318 1,318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS
M3### 9,548 9,548 9,548 9,548 9,548 9,548 9,548

EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y


2.2 210.2.1 PRÉSTAMOS M3### 35,558 35,558 35,558 35,558 35,558 35,558 35,558

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN,


2.3 210.2.2 CANALES Y PRÉSTAMOS
M3### 8,749 8,749 8,749 8,749 8,749 8,749 8,749

2.4 220.1 TERRAPLENES M3### 14,967 14,967 14,967 14,967 14,967 14,967 14,967
2.5 221.1 PEDRAPLÉN COMPACTO M3### 13,068 13,068 13,068 13,068 13,068 13,068 13,068
2.6 221.2 PEDRAPLÉN SUELTO M3### 7,499 7,499 7,499 7,499 7,499 7,499 7,499
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 EXISTENTE
M2### 481 481 481 481 481 481 481

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO


2.8 230.2 ÚNICAMENTE MATERIAL ADICIONADO
M3### 12,832 12,832 12,832 12,832 12,832 12,832 12,832
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 20,948 20,948 20,948 20,948 20,948 20,948 20,948

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE


2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 65,265 65,265 65,265 65,265 65,265 65,265 65,265

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO


2.11 600.3 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 80,039 80,039 80,039 80,039 80,039 80,039 80,039
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE
2.12 600.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3### 19,035 19,035 19,035 19,035 19,035 19,035 19,035
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO i
2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE M3### p 39,738 39,738 39,738 39,738 39,738 39,738 39,738
5 KM) i
o
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA
2.14 600.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE M3### 31,203 31,203 31,203 31,203 31,203 31,203 31,203
5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A
2.15 600.5 P MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA M3### 53,644 53,644 53,644 53,644 53,644 53,644 53,644
MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2### 5,366 5,366 5,366 5,366 5,366 5,366 5,366
3.2 320.1 SUBBASE GRANULAR M3### 105,151 118,858 117,144 154,839 137,705 123,998 110,291
3.3 330.1 BASE GRANULAR M3### 107,648 121,355 119,642 157,336 140,202 126,495 112,788
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE
3.4 365.1 (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 M3### 139,125 139,125 139,125 139,125 139,125 139,125 139,125
Km)
3.5 420.1 RIEGO DE IMPRIMACIÓN M2### 3,267 3,267 3,267 3,267 3,267 3,267 3,267
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2### 1,130 1,130 1,130 1,130 1,130 1,130 1,130
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
3.7 461.1 ASFÁLTICA M3### 222,651 222,042 223,716 225,848 223,564 226,762 225,391
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2### 66,212 66,030 66,531 67,170 66,486 67,443 67,033
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO) M3### 705,519 695,634 702,224 730,232 713,757 748,354 735,174
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3.10 450.2 P ASFÁLTICO)
M3### 712,957 703,072 709,662 737,669 721,194 755,792 742,612
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE
3.11 450.9 P CEMENTO ASFÁLTICO) M3### 749,976 740,091 746,681 774,689 758,214 792,811 779,631
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE
3.12 450.3 P CEMENTO ASFÁLTICO) M3### 727,832 717,947 724,537 752,544 736,069 770,667 757,487
3,12(1) P MEZCLA ASFALTICA NATURAL M3### 371,469 347,754 337,722 334,999 324,173 355,331 358,170
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3### 258,115 271,822 270,108 307,803 290,669 276,962 263,255
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3### 254,404 268,111 266,398 304,093 286,959 273,251 259,544
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3### 38,962 38,962 38,962 38,962 38,962 38,962 38,962
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3### 173,290 173,290 173,290 173,290 173,290 173,290 173,290
3.15 311.1 AFIRMADO M3### 80,032 69,751 76,605 97,166 88,599 105,733 102,306
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2### 11,470 11,427 11,545 11,695 11,534 11,759 11,662
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2### 4,587 4,566 4,625 4,700 4,619 4,732 4,684
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO
3.18 500.1 DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3### 620,939 618,075 625,950 635,973 625,235 640,268 633,825
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO i
3.19 500.1 DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3### p 652,567 649,575 657,803 668,275 657,056 672,762 666,031
i
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO
3.20 500.1 M3### o 673,641 670,563 679,026 689,797 678,257 694,413 687,489
DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO
3.21 *** (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y ML ### 7,096 7,096 7,096 7,096 7,096 7,096 7,096
SELLANTE)
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3### 90,499 102,097 100,647 132,543 118,045 106,446 94,848

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3### 892,802 889,553 898,486 909,856 897,675 914,728 907,419
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3### 766,745 763,551 772,336 783,516 771,538 788,308 781,120
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3### 812,131 808,810 817,943 829,567 817,114 834,548 827,076
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3### 550,396 547,461 555,533 565,808 554,799 570,210 563,605
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3### 645,785 642,734 651,126 661,808 650,363 666,384 659,518
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3### 547,618 544,596 552,906 563,483 552,151 568,015 561,217
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3### 642,897 639,756 648,395 659,391 647,610 664,102 657,035
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3### 706,649 703,627 711,938 722,514 711,182 727,046 720,248
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3### 566,155 563,014 571,653 582,649 570,868 587,360 580,293
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3### 749,655 746,514 755,153 766,149 754,368 770,860 763,793
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y
4.11 650 P MONTAJE DE ACERO A-36 KG ### 11,971 11,971 11,971 11,971 11,971 11,971 11,971
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y
4.12 650 P MONTAJE DE ACERO A-588 GRADO B KG ### 15,383 15,383 15,383 15,383 15,383 15,383 15,383
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,807 1,807 1,807 1,807 1,807 1,807 1,807
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,717,709 2,717,709 2,717,709 2,717,709 2,717,709 2,717,709 2,717,709
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M.
4.15 621.1 P CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN ML ### 4,095,633 4,090,077 4,105,357 4,124,805 4,103,969 4,133,138 4,120,637
CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4.16 621.2 REFUERZO) M3### 1,702,375 1,699,383 1,707,611 1,718,083 1,706,863 1,722,570 1,715,839
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 88,351 88,351 88,351 88,351 88,351 88,351 88,351
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 359,966 359,607 360,595 361,851 360,505 362,390 361,582
4.19 632 P BARANDA METÁLICA ML ### 426,925 426,925 426,925 426,925 426,925 426,925 426,925
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,145 17,145 17,145 17,145 17,145 17,145 17,145
CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL
4.21 671.1 LUGAR M3### 466,771 457,275 470,210 493,957 476,799 503,982 494,743
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3### 100,168 111,767 110,317 142,213 127,715 116,116 104,518
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
4.23 610.1 RELLENO PARA ESTRUCTURAS M3### i 84,266 74,776 81,103 100,082 92,174 107,990 104,827
p
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3###
i 358,943 355,770 364,496 375,602 363,703 380,360 373,221
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.25 630.7 M3### o 349,121 351,454 356,110 374,306 361,966 367,643 359,185
BASES
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.26 630.7 ELEVACIONES M3### 357,764 360,097 364,753 382,949 370,609 376,286 367,828

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3### 363,830 366,201 370,752 388,813 376,617 382,092 373,721

4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3### 372,473 374,844 379,395 397,456 385,260 390,735 382,364
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3### 495,983 492,875 501,422 512,301 500,646 516,962 509,970
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3### 589,445 586,214 595,101 606,410 594,293 611,256 603,987
4.31 681.1 GAVIÓN M3### 179,296 190,367 188,983 219,429 205,590 194,519 183,448
4.32 681.1 GAVIÓN MALLA PVC M3### 183,527 194,598 193,214 223,660 209,821 198,750 187,678
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO
4.33 672.1 CLASE E, 2500 PSI ML ### 41,009 40,819 41,343 42,011 41,296 42,297 41,868
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO
4.34 672.1 CLASE E, 2500 PSI ML ### 15,694 15,599 15,861 16,195 15,837 16,338 16,123
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE
4.35 *** REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2### 10,240 10,240 10,240 10,240 10,240 10,240 10,240
SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-
4.36 *** 50 M2### 14,607 14,607 14,607 14,607 14,607 14,607 14,607
SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-
4.37 *** 75 M2### 19,663 19,663 19,663 19,663 19,663 19,663 19,663
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2### 23,575 23,575 23,575 23,575 23,575 23,575 23,575
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN)
M2### 30,297 30,297 30,297 30,297 30,297 30,297 30,297

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800


4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 7,349 7,349 7,349 7,349 7,349 7,349 7,349

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 8,375 8,375 8,375 8,375 8,375 8,375 8,375

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2### 8,706 8,706 8,706 8,706 8,706 8,706 8,706

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700


4.43 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 6,199 6,199 6,199 6,199 6,199 6,199 6,199

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100


4.44 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 9,342 9,342 9,342 9,342 9,342 9,342 9,342
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400
4.45 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2### p 7,616 7,616 7,616 7,616 7,616 7,616 7,616
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 o
4.46 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 9,342 9,342 9,342 9,342 9,342 9,342 9,342

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000


4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2### 17,959 17,959 17,959 17,959 17,959 17,959 17,959

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO


4.48 661.1 REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA ML ### 638,915 638,871 638,990 639,141 638,979 639,206 639,109
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
4.49 660.3 DIÁMETRO 600 MM ML ### 361,164 360,483 362,355 364,737 362,185 365,758 364,227

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-


4.50 *** ALCANTARILLADO, DIÁMETRO 36" ML ### 894,999 894,999 894,999 894,999 894,999 894,999 894,999

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3### 148,852 138,967 145,557 165,327 157,089 173,564 170,269

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO


4.52 640.1 60000 PSI KG ### 4,489 4,489 4,489 4,489 4,489 4,489 4,489

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE


4.53 *** SUMINISTRO E INSTALACIÓN) ML ### 87,150 87,150 87,150 87,150 87,150 87,150 87,150

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE


4.54 *** SUMINISTRO E INSTALACIÓN) ML ### 132,792 132,792 132,792 132,792 132,792 132,792 132,792
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3### 504,712 501,481 510,368 521,677 509,560 526,523 519,254
4.56 682.1 P COLCHONETA RENO M3### 195,277 206,348 204,964 235,410 221,571 210,500 199,429
4.57 *** TRINCHO EN MADERA M2### 68,938 68,938 68,938 68,938 68,938 68,938 68,938

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,108 4,108 4,108 4,108 4,108 4,108 4,108
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2### 43,988 43,988 43,988 43,988 43,988 43,988 43,988
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 85,005 85,005 85,005 85,005 85,005 85,005 85,005
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 70,704 70,704 70,704 70,704 70,704 70,704 70,704
5.5 730.1 DEFENSA METÁLICA ML ### 148,893 148,743 149,154 149,678 149,117 149,902 149,566
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES
UN ### 13,763 13,763 13,763 13,763 13,763 13,763 13,763

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2### 843 843 843 843 843 843 843
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL
6.2 801.6 A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE UN ### 131,984 131,984 131,984 131,984 131,984 131,984 131,984
SOBRANTES A UNA DISTANCIA DE 5 KM
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE i
6.3 801.7 RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA ML ### p 25,566 25,566 25,566 25,566 25,566 25,566 25,566
DISTANCIA DE 5 KM i
o
6.4 211.1 REMOCIÓN DE DERRUMBES M3### 8,310 8,310 8,310 8,310 8,310 8,310 8,310
ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
6.5 801.1 DE 5 KM) HA ### 448,890 448,890 448,890 448,890 448,890 448,890 448,890

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE


6.6 801.4 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2### 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2### 15,653 15,653 15,653 15,653 15,653 15,653 15,653
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2### 25,355 25,355 25,355 25,355 25,355 25,355 25,355
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2### 9,583 9,583 9,583 9,583 9,583 9,583 9,583

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
CONSTRUCCIÓN

2,012,221 2,020,875 2,007,172


1,174,170 1,178,498 1,171,646
14,302 14,302 14,302
16,035 16,035 16,035
18,536 18,536 18,536
66,935 66,935 66,935
46,766 46,860 46,711
21,506 21,600 21,451
80,242 80,242 80,242
6,261 6,261 6,261
8,882 8,882 8,882
6,813 6,813 6,813
7,419 7,419 7,419
8,964 8,964 8,964
9,084 9,084 9,084
13,497 13,497 13,497
18,477 18,477 18,477
27,441 27,441 27,441
39,898 39,898 39,898
49,367 49,367 49,367
40,806 40,806 40,806
57,319 57,319 57,319
67,872 67,872 67,872
83,193 83,193 83,193
9,103 9,103 9,103
14,736 14,736 14,736
22,422 22,422 22,422
36,746 36,746 36,746
233,157 233,157 233,157
1,539 1,539 1,539
5,807 5,807 5,807
20,960 20,960 20,960
11,490 11,490 11,490
11,307 11,307 11,307
10,480 10,480 10,480
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
9,803 9,803 9,803
15,459 15,459 15,459
13,512 13,512 13,512
11,490 11,490 11,490
917,701 918,644 917,152
10,595 10,595 10,595
3,827 3,827 3,827
2,742,727 2,742,727 2,742,727
253,285 253,285 253,285
9,189 9,189 9,189

72,992 72,992 72,992


199,855 210,177 193,834
297,878 297,878 297,878
207,425 207,425 207,425
22,581 22,581 22,581
625,535 634,779 620,141
626,543 636,133 620,947
583,101 592,081 577,861
49,907 49,907 49,907
153,950 153,950 153,950

192,736 192,736 192,736

239,639 239,639 239,639

302,778 302,778 302,778


104,251 104,906 103,869
128,510 129,459 127,956
568,951 577,932 563,712
92,160 92,160 92,160
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
38,982 39,046 38,945
202,422 202,486 202,385
442,909 446,477 440,827
225,010 226,145 224,347
254,769 256,651 253,671
333,965 337,164 332,099
105,272 105,272 105,272
1,310,826 1,310,826 1,310,826
117,223 117,931 116,810
74,156 74,530 73,938
27,943 28,103 27,849
45,340 45,500 45,247
59,500 59,724 59,369
81,625 81,881 81,475
113,347 113,571 113,216
971,850 974,414 970,354

1,370,884 1,376,012 1,367,892

1,777,327 1,787,584 1,771,343

43,044 43,044 43,044


56,883 56,883 56,883
791,613 800,594 786,374
238,958 247,461 232,779
97,835 98,707 97,327

115,380 116,427 114,770

127,460 128,855 126,646

134,462 135,944 133,597

153,747 155,578 152,679


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate

170,872 172,965 169,652

189,548 191,902 188,174


100,961 101,112 100,874
942,568 951,549 937,329
96,984 97,112 96,909
77,925 78,823 77,401
87,426 88,525 86,785
101,623 103,000 100,819
689,398 698,378 684,158
49,108 49,385 48,947

273,738 277,749 271,398


4,280 4,280 4,280
4,489 4,489 4,489
6,266 6,266 6,266
837,032 846,013 831,793
758,650 768,478 752,915
831,278 840,259 826,039
811,209 820,190 805,970
1,021,941 1,030,921 1,016,701
298,868 308,772 293,089

29,451 29,699 29,305


49,862 50,111 49,717
35,464 35,528 35,426
166,028 166,156 165,953
43,882 44,158 43,720
27,235 27,363 27,160
101,235 101,491 101,085
89,905 90,828 89,366
93,030 93,030 93,030
54,438 54,438 54,438
89,564 89,564 89,564
52,705 52,705 52,705
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
104,051 104,051 104,051
61,271 61,271 61,271
115,812 115,812 115,812
67,151 67,151 67,151
41,434 41,563 41,359
25,031 25,095 24,993
54,137 54,223 54,087
32,448 32,491 32,423
60,886 60,972 60,836
36,496 36,539 36,471
101,137 101,566 100,886
59,647 59,862 59,522
37,974 38,060 37,924
22,968 23,011 22,943
75,632 75,803 75,531
45,477 45,563 45,427
89,710 89,838 89,635
54,193 54,258 54,156
185,968 186,569 185,617
111,378 111,679 111,203
91,371 91,622 91,224
55,024 55,150 54,950
47,797 47,989 47,685
28,997 29,093 28,941
34,386 34,472 34,336
20,899 20,942 20,874
52,096 52,268 51,996
31,829 31,915 31,779
100,579 100,836 100,428
61,038 61,166 60,962
73,383 73,554 73,282
44,191 44,277 44,141
154,384 154,985 154,033
93,609 93,910 93,433
32,302 32,366 32,265
36,806 36,988 36,701
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
62,249 62,490 62,108
5,264 5,264 5,264
50,228 50,476 50,083
10,637 10,637 10,637
14,076 14,076 14,076
18,400 18,400 18,400
25,792 25,792 25,792
38,506 38,506 38,506
4,797 4,864 4,757

16,241 16,241 16,241


5,787 5,851 5,750
6,973 7,037 6,936
8,276 8,340 8,239
6,957 6,957 6,957
13,818 13,818 13,818
24,200 24,376 24,097
14,694 14,782 14,642
21,297 21,477 21,192
12,932 13,023 12,880
20,309 20,485 20,206
12,438 12,526 12,387
21,297 21,477 21,192
12,932 13,023 12,880
21,666 21,791 21,592
13,116 13,178 13,079
17,709 17,846 17,628
10,850 10,918 10,810
16,956 17,090 16,877
10,473 10,540 10,434
22,075 22,256 21,970
13,302 13,392 13,249
21,087 21,263 20,984
12,807 12,895 12,756
17,566 17,700 17,488
10,761 10,828 10,721
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
21,976 22,153 21,873
13,656 13,744 13,605

27,089 27,347 26,939


83,427 83,888 83,157
56,536 56,536 56,536
22,507 22,507 22,507
35,352 35,352 35,352
82,632 82,632 82,632
64,693 64,693 64,693
37,602 37,602 37,602
86,602 86,602 86,602
103,423 103,423 103,423
152,019 152,019 152,019
60,007 60,007 60,007
83,358 83,358 83,358
75,770 75,770 75,770
134,596 134,596 134,596
78,621 78,621 78,621
57,743 57,743 57,743
32,848 32,848 32,848
60,227 60,548 60,040
48,136 48,136 48,136
44,127 44,127 44,127
37,196 37,196 37,196
36,423 36,423 36,423
36,698 36,698 36,698
51,674 51,674 51,674
45,425 45,425 45,425
83,164 83,164 83,164
153,599 153,599 153,599
69,037 69,037 69,037
43,211 43,211 43,211
33,870 33,870 33,870
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
59,115 59,115 59,115
20,311 20,311 20,311
24,446 24,446 24,446
26,498 26,498 26,498
34,133 34,133 34,133
22,518 22,518 22,518
53,021 53,021 53,021
364,030 364,030 364,030
414,898 414,898 414,898
276,385 276,385 276,385
295,372 295,372 295,372

435,599 445,087 430,063


379,169 387,888 374,082
376,312 385,287 371,076
330,792 340,024 325,406
306,197 315,621 300,699
275,052 284,668 269,442
243,402 252,249 238,241
458,286 466,876 453,274
411,221 419,614 406,325
474,495 482,345 469,917
705,595 713,445 701,017

125,649 125,649 125,649


4,034 4,098 3,997
140,544 140,544 140,544
172,181 172,181 172,181
250,540 250,540 250,540
278,873 278,873 278,873
307,238 307,238 307,238
204,075 204,075 204,075
231,367 231,367 231,367
340,534 340,534 340,534
129,022 129,022 129,022
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
171,325 171,325 171,325
190,429 190,429 190,429
485,181 485,181 485,181
42,913 42,913 42,913
26,691 26,691 26,691
101,445 101,445 101,445
124,092 124,092 124,092
96,391 96,391 96,391
29,854 29,854 29,854
29,854 29,854 29,854
28,298 28,298 28,298
43,267 43,267 43,267
53,604 53,604 53,604
64,629 64,629 64,629
77,723 77,723 77,723
366,349 366,349 366,349
256,091 256,091 256,091
34,308 34,308 34,308
43,957 43,957 43,957
53,604 53,604 53,604
67,387 67,387 67,387

77,590 77,590 77,590


216,184 216,184 216,184
82,095 82,095 82,095
146,741 146,741 146,741
139,213 139,213 139,213
91,397 91,397 91,397
215,497 215,497 215,497
112,199 112,199 112,199
6,728 6,728 6,728
101,145 101,145 101,145

123,463 123,463 123,463


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
41,651 41,651 41,651

551,380 551,380 551,380


198,180 198,180 198,180

222,187 222,187 222,187

502,610 502,610 502,610

130,615 130,615 130,615


402,169 402,169 402,169
6,148 6,148 6,148
282,693 282,693 282,693
124,385 124,385 124,385
87,962 87,962 87,962
90,769 90,769 90,769

10,748 10,748 10,748

11,932 11,932 11,932

9,476 9,476 9,476

224,869 224,869 224,869


271,434 271,434 271,434
22,507 22,507 22,507
35,352 35,352 35,352
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
33,893 33,893 33,893
43,473 43,473 43,473
89,691 89,691 89,691
226,261 226,261 226,261
44,314 44,314 44,314
616,334 616,334 616,334
1,268,924 1,268,924 1,268,924
35,648 35,648 35,648
67,706 67,706 67,706
101,206 101,206 101,206
85,509 85,509 85,509
62,257 62,257 62,257
66,250 66,250 66,250
83,725 83,725 83,725
67,558 67,558 67,558
84,605 84,605 84,605
90,512 90,512 90,512
75,112 75,112 75,112
12,720 12,720 12,720
17,924 17,924 17,924
23,399 23,399 23,399
14,444 14,444 14,444
8,623 8,623 8,623
52,157 52,157 52,157
33,352 33,352 33,352
10,802 10,802 10,802
25,750 25,750 25,750
35,736 35,736 35,736
48,503 48,503 48,503
90,746 90,746 90,746
110,134 110,134 110,134
61,385 61,385 61,385
78,196 78,196 78,196
189,007 189,007 189,007
389,946 389,946 389,946
288,033 288,033 288,033
17,944 17,944 17,944
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
22,650 22,650 22,650
176,196 176,196 176,196

286,966 286,966 286,966

477,663 477,663 477,663

41,308 41,308 41,308

48,716 48,716 48,716

62,444 62,444 62,444

70,873 70,873 70,873

91,340 91,340 91,340

105,643 105,643 105,643

156,189 156,189 156,189


62,891 62,891 62,891
63,149 63,149 63,149
40,771 40,771 40,771
50,268 50,268 50,268

4,262 4,262 4,262

6,721 6,721 6,721

1,037,892 1,037,892 1,037,892


792,538 792,538 792,538
2,668,146 2,668,146 2,668,146
2,224,293 2,224,293 2,224,293
644,944 644,944 644,944
834,895 834,895 834,895
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
321,775 321,775 321,775

371,509 371,509 371,509


59,033 59,033 59,033
69,893 69,893 69,893
77,590 77,590 77,590
91,398 91,398 91,398
55,492 55,492 55,492
63,256 63,256 63,256
145,929 145,929 145,929
56,986 56,986 56,986
130,979 130,979 130,979
78,308 78,308 78,308
46,441 46,441 46,441
97,838 97,838 97,838
417,708 417,708 417,708
556,470 556,470 556,470
3,604 3,604 3,604
4,758 4,758 4,758
7,405 7,405 7,405
13,242 13,242 13,242
278,288 278,288 278,288
78,601 78,601 78,601
106,463 106,463 106,463
43,351 43,351 43,351
1,425,766 1,425,766 1,425,766
1,056,563 1,056,563 1,056,563
1,322,974 1,322,974 1,322,974
615,904 615,904 615,904
112,317 112,317 112,317
516,786 516,786 516,786
646,594 646,594 646,594
1,708,141 1,708,141 1,708,141
1,257,825 1,257,825 1,257,825
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate

40,048 40,350 39,872


39,826 40,128 39,650
14,848 14,908 14,812
27,717 28,321 27,365
86,104 86,708 85,752
26,422 26,611 26,312
55,879 56,802 55,340
76,979 78,456 76,117
31,067 31,067 31,067
23,436 23,436 23,436
27,488 27,488 27,488
45,266 46,097 44,781
52,923 53,939 52,331
76,466 78,036 75,551
80,527 87,131 76,675
83,773 89,414 80,481

58,366 58,486 58,295


34,855 34,916 34,820
66,445 66,747 66,269
69,845 70,147 69,669
74,233 74,535 74,057
77,097 77,218 77,027
37,448 37,572 37,375
167,459 168,003 167,142
46,497 46,806 46,316
44,719 44,719 44,719
10,076 10,200 10,003
9,644 9,644 9,644
12,950 12,950 12,950
10,776 10,776 10,776
18,083 18,083 18,083
35,277 35,277 35,277
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
9,392 9,392 9,392
76,224 76,224 76,224
120,724 121,147 120,478
7,667 7,667 7,667
32,662 32,790 32,587
47,129 47,129 47,129
54,794 54,794 54,794
50,344 50,344 50,344
50,589 50,709 50,518
56,829 56,950 56,759
11,169 11,169 11,169
50,738 50,930 50,626
21,164 21,164 21,164
126,743 126,743 126,743
10,150 10,150 10,150
23,090 23,090 23,090
14,790 14,790 14,790
14,367 14,367 14,367
8,715 8,715 8,715
8,869 8,869 8,869
19,552 19,552 19,552
17,812 17,812 17,812
19,241 19,241 19,241

22,243 22,243 22,243

66,829 66,950 66,758


79,715 79,715 79,715
34,712 34,712 34,712
13,599 13,599 13,599
104,785 104,785 104,785
126,762 126,762 126,762

74,886 74,886 74,886


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
36,654 36,654 36,654
56,796 56,796 56,796
69,748 69,748 69,748
52,037 52,037 52,037
96,587 96,587 96,587
50,279 50,279 50,279
106,812 106,812 106,812
13,720 13,720 13,720

5,627 5,627 5,627


18,479 18,479 18,479
25,905 25,905 25,905

43,707 43,707 43,707

49,987 49,987 49,987

85,005 85,005 85,005

19,114 19,114 19,114

67,558 67,558 67,558


85,719 92,771 81,605
124,386 136,380 115,188
62,898 62,898 62,898
118,858 130,852 106,864
121,355 133,349 112,158

310,409 310,409 310,409


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate

915,816 915,816 915,816

496,051 496,051 496,051

143,458 143,458 143,458

201,106 201,106 201,106

186,736 186,736 186,736

411,583 411,583 411,583

1,053,286 1,053,286 1,053,286

298,867 298,867 298,867

211,551 211,551 211,551

83,944 83,944 83,944

256,291 256,291 256,291

377,740 377,740 377,740

8,501 8,501 8,501


3,156 3,156 3,156
11,303 11,303 11,303
43,113 43,113 43,113
5,927 5,927 5,927
67,512 67,512 67,512
3,521 3,521 3,521
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
2,830 2,830 2,830
14,188 14,188 14,188
4,113 4,113 4,113
14,962 14,962 14,962
5,877 5,877 5,877
6,683 6,683 6,683
7,120 7,120 7,120
4,455 4,455 4,455
15,785 15,785 15,785
9,771 9,771 9,771
23,095 23,095 23,095
2,730 2,730 2,730
12,446 12,446 12,446
3,356 3,356 3,356
12,825 12,825 12,825
7,208 7,208 7,208
4,524 4,524 4,524
22,278 22,278 22,278
12,885 12,885 12,885
7,952 7,952 7,952

6,239,534 6,239,534 6,239,534


11,024,273 ### 11,024,273
2,885,012 2,885,012 2,885,012
9,428,536 9,428,536 9,428,536
8,829,854 8,829,854 8,829,854
2,730 2,730 2,730
885,107 885,107 885,107
88,486 88,486 88,486
1,601,977 1,602,071 1,601,921
686,000 688,244 684,691

29,961 29,961 29,961


44,612 44,612 44,612
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
55,341 55,341 55,341
17,966 17,966 17,966

21,788 21,788 21,788

29,738 29,738 29,738


26,488 26,488 26,488
27,931 27,931 27,931
34,958 34,958 34,958
18,080 18,080 18,080
23,713 23,713 23,713
36,504 36,504 36,504
280,152 280,152 280,152
322,471 322,471 322,471
336,260 336,260 336,260
311,725 311,725 311,725

227,588 227,588 227,588


34,924 34,924 34,924
106,117 106,117 106,117
268,455 268,455 268,455
53,158 53,158 53,158
587,832 587,832 587,832
1,459,820 1,459,820 1,459,820
45,297 45,297 45,297
227,776 227,776 227,776
44,853 44,853 44,853
3,852 3,852 3,852
6,487 6,487 6,487
18,907 18,907 18,907
24,796 24,796 24,796
32,215 32,215 32,215
125,989 125,989 125,989

32,865 32,865 32,865

107,581 107,581 107,581


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
187,324 187,324 187,324
295,127 295,127 295,127
366,272 366,272 366,272
400,387 400,387 400,387
585,307 585,307 585,307
344,490 344,490 344,490
106,773 106,773 106,773
14,237 14,237 14,237
29,111 29,111 29,111
5,111 5,111 5,111
35,960 35,960 35,960
37,587 37,587 37,587
38,398 38,398 38,398
25,044 25,044 25,044
27,719 27,719 27,719
28,842 28,842 28,842
48,596 48,596 48,596
629,452 629,452 629,452
323,007 323,007 323,007
90,251 90,251 90,251
1,875 1,875 1,875
8,660 8,660 8,660
12,937 12,937 12,937
21,609 21,609 21,609
3,997 3,997 3,997
22,634 22,634 22,634
32,986 32,986 32,986
19,711 19,711 19,711
15,712 15,712 15,712

636,021 636,021 636,021


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
URBANISMO

9,712 9,712 9,712


93,087 93,087 93,087
524,463 524,463 524,463
1,119,424 1,119,424 1,119,424
128,297 128,297 128,297
781,748 781,748 781,748
1,682,523 1,682,523 1,682,523
13,376 13,376 13,376
16,510 16,510 16,510
20,745 20,745 20,745
22,710 22,710 22,710
27,236 27,236 27,236
27,236 27,236 27,236
109,665 109,665 109,665
127,018 127,018 127,018
393,113 393,113 393,113
147,628 147,628 147,628
243,362 243,362 243,362
1,077,046 1,077,046 1,077,046
1,240,933 1,240,933 1,240,933
14,526 14,526 14,526
12,813 12,813 12,813
31,723 31,723 31,723
125,762 125,762 125,762
187,330 187,330 187,330
30,589 30,589 30,589
105,413 105,413 105,413
156,258 156,258 156,258
30,927 30,927 30,927
63,782 63,782 63,782
256,994 256,994 256,994
74,426 74,426 74,426
299,024 299,024 299,024
179,149 179,149 179,149
510,282 510,282 510,282
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
1,367,283 1,367,283 1,367,283
2,020,337 2,020,337 2,020,337

10,904 10,904 10,904


24,905 24,905 24,905
19,114 19,114 19,114
67,471 74,203 63,544
62,523 62,523 62,523
67,957 67,957 67,957
93,448 100,622 86,274
70,649 77,963 63,336
92,118 100,452 87,256

117,233 117,233 117,233


1,222,652 1,222,652 1,222,652
153,216 153,216 153,216
1,416,151 1,416,151 1,416,151
987,014 987,014 987,014
62,946 62,946 62,946
116,376 116,376 116,376
274,841 274,841 274,841
274,834 274,834 274,834
441,258 441,258 441,258
116,425 116,425 116,425
116,425 116,425 116,425
274,841 274,841 274,841
274,841 274,841 274,841
441,258 441,258 441,258
442,842 442,842 442,842
719,252 719,252 719,252
1,154,434 1,154,434 1,154,434
71,327 71,327 71,327
370,519 370,519 370,519
415,631 415,631 415,631
1,150,299 1,150,299 1,150,299
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
67,214 67,300 67,164
335,861 335,861 335,861
51,121 51,121 51,121
72,316 72,316 72,316
104,374 104,374 104,374
160,224 160,224 160,224
257,534 257,534 257,534
373,569 373,569 373,569
472,775 472,775 472,775
621,636 621,636 621,636
855,161 855,161 855,161

663,386 668,771 660,244

653,347 657,193 651,104

714,115 717,705 712,020

787,168 793,899 783,241

928,762 934,178 925,603

822,185 827,121 819,305


997,145 999,865 995,559
1,436,113 1,443,885 1,431,581
1,957,752 1,972,056 1,949,407
2,583,496 2,607,272 2,569,624
1,869,307 1,869,307 1,869,307
3,956,619 3,956,619 3,956,619
140,006 140,163 139,915

74,206 74,655 73,944


87,986 88,435 87,724
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
53,805 54,774 53,239
58,585 59,527 58,035
58,885 59,800 58,350
258,475 258,632 258,383
18,204 18,321 18,136
38,515 39,198 38,116
84,610 84,694 84,561
558,785 560,918 557,542
62,745 63,104 62,535
91,588 91,947 91,378
32,626 33,003 32,406

52,076 52,839 51,631


96,760 98,237 95,748
60,701 60,918 60,574

205,071 205,520 204,809


676,881 677,509 676,514
218,068 218,162 218,013
162,823 163,361 162,508
164,690 165,229 164,376
193,441 194,006 193,111
59,304 59,647 59,103
68,928 69,312 68,703
317,502 317,587 317,451
836,463 836,732 836,305
3,437,923 3,438,102 3,437,818
3,536,698 3,536,877 3,536,593
493,839 494,028 493,729
652,689 653,443 652,249
543,921 543,921 543,921
250,883 251,152 250,726
585,564 585,779 585,439
6,532,329 6,533,676 6,531,544
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate

4,108 4,108 4,108


43,988 43,988 43,988
318,696 318,774 318,650
500,939 501,316 500,719
237,929 238,007 237,883
252,749 252,827 252,703
263,971 264,049 263,925
13,763 13,763 13,763
14,701 14,701 14,701
119,768 119,768 119,768
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
ECIFICACIONES TÉCNICAS INVIAS 2007)

152,777 152,777 152,777

53,673 53,673 53,673

2,613,971 2,613,971 2,613,971

933,801 933,801 933,801

89,524 89,524 89,524

1,318 1,318 1,318

9,548 9,548 9,548

35,558 35,558 35,558

8,749 8,749 8,749

14,967 14,967 14,967


13,068 13,068 13,068
7,499 7,499 7,499
481 481 481

12,832 12,832 12,832

20,948 20,948 20,948

65,265 65,265 65,265

80,039 80,039 80,039

19,035 19,035 19,035


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate

39,738 39,738 39,738

31,203 31,203 31,203

53,644 53,644 53,644

5,366 5,366 5,366


118,858 130,852 106,864
121,355 133,349 112,158
139,125 139,125 139,125
3,267 3,267 3,267
1,130 1,130 1,130
221,889 223,716 220,823
65,984 66,531 65,665
700,577 712,109 684,102

676,712 666,827 691,539

713,731 703,846 728,559

691,587 681,702 706,414


362,780 375,822 355,569
271,822 283,816 262,624
268,111 280,105 256,117
38,962 38,962 38,962
173,290 173,290 173,290
62,898 62,898 62,898
11,417 11,545 11,342
4,561 4,625 4,523
617,360 625,950 612,348
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
648,828 657,803 643,592

669,794 679,026 664,409

7,096 7,096 7,096

102,097 112,246 91,948

888,742 898,486 883,057


762,753 772,336 757,161
807,981 817,943 802,168
546,727 555,533 541,589
641,971 651,126 636,630
543,842 552,906 538,553
638,971 648,395 633,474
702,873 711,938 697,584
562,229 571,653 556,732
745,729 755,153 740,232
11,971 11,971 11,971

15,383 15,383 15,383


1,807 1,807 1,807
2,717,709 2,717,709 2,717,709

4,088,689 4,105,357 4,078,965

1,698,636 1,707,611 1,693,400


88,351 88,351 88,351
359,518 360,595 358,889
426,925 426,925 426,925
17,145 17,145 17,145
452,266 461,775 446,718
111,767 121,915 101,618
GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate
68,450 68,450 68,450
354,977 364,496 349,424
350,983 360,328 343,994

359,626 368,971 352,637

365,740 374,970 358,818

374,383 383,613 367,461


492,098 501,422 486,658
585,407 595,101 579,752
190,367 200,055 180,680
194,598 204,285 184,911
40,771 41,343 40,437

15,575 15,861 15,408

10,240 10,240 10,240

14,607 14,607 14,607

19,663 19,663 19,663

23,575 23,575 23,575

30,297 30,297 30,297

7,349 7,349 7,349

8,375 8,375 8,375

8,706 8,706 8,706

6,199 6,199 6,199

9,342 9,342 9,342


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate

7,616 7,616 7,616

9,342 9,342 9,342

17,959 17,959 17,959

638,861 638,990 638,785

360,313 362,355 359,122

894,999 894,999 894,999

132,377 132,377 132,377

4,489 4,489 4,489

87,150 87,150 87,150

132,792 132,792 132,792


500,674 510,368 495,019
206,348 216,035 196,661
68,938 68,938 68,938

4,108 4,108 4,108


43,988 43,988 43,988
85,005 85,005 85,005
70,704 70,704 70,704
148,706 149,154 148,444
13,763 13,763 13,763

843 843 843

131,984 131,984 131,984


GOBERNACIÓN DE CUNDINAMARCA
RECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)
PROVINCIA: UBATE
EMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
Sutatausa Tausa Ubate

25,566 25,566 25,566

8,310 8,310 8,310

448,890 448,890 448,890

1,804 1,804 1,804


15,653 15,653 15,653
25,355 25,355 25,355
9,583 9,583 9,583

DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS