Está en la página 1de 311

GOBERNACIÓN DE CUNDINAMARCA

LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)


M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
CONSTRUCCIÓN p
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,063,035 2,081,256 2,098,463 2,082,268 2,086,316 2,095,426 2,076,194
1.2 CAMPAMENTO 9 M2 UN ### 1,205,662 1,214,772 1,223,376 1,215,279 1,217,302 1,221,858 1,212,242
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,712 14,712 14,712 14,712 14,712 14,712 14,712
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,489 16,489 16,489 16,489 16,489 16,489 16,489
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,085 19,085 19,085 19,085 19,085 19,085 19,085
1.6 CERCA EN TABLA H=2.30 M ML ### 67,397 67,397 67,397 67,397 67,397 67,397 67,397
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 47,441 47,643 47,835 47,655 47,700 47,801 47,587
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,111 22,313 22,504 22,324 22,369 22,471 22,257
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 925,136 927,161 931,362 927,970 928,022 931,224 926,598
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 10,604 10,604 10,604 10,604 10,604 10,604 10,604
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,856 3,856 3,856 3,856 3,856 3,856 3,856
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,749,047 2,749,047 2,749,047 2,749,047 2,749,047 2,749,047 2,749,047
1.44 RED TELEFÓNICA PROVISIONAL UN ### 255,430 255,430 255,430 255,430 255,430 255,430 255,430
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
2 CIMIENTOS
p
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ###i 88,881 88,881 129,306 101,185 101,185 129,306 88,881
2.2 BASE ARENA CEMENTO 1:20 M3 ###o 198,557 214,800 230,140 215,702 219,311 227,434 210,287
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 217,047 217,047 217,047 217,047 217,047 217,047 217,047
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,738 22,738 22,738 22,738 22,738 22,738 22,738
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 662,846 682,593 701,242 683,690 688,077 697,951 677,108
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 666,770 687,438 706,958 688,587 693,179 703,512 681,697
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 621,617 640,970 659,247 642,045 646,345 656,021 635,594
2.9 PILOTE DE MADERA D=20 CM ML ### 50,983 50,983 50,983 50,983 50,983 50,983 50,983
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.10 DE 5 KM) ML ### 157,427 157,427 157,427 157,427 157,427 157,427 157,427

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.11 DE 5 KM) ML ### 196,070 196,070 196,070 196,070 196,070 196,070 196,070

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.12 DE 5 KM)
ML ### 242,801 242,801 242,801 242,801 242,801 242,801 242,801

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.13 DE 5 KM)
ML ### 305,708 305,708 305,708 305,708 305,708 305,708 305,708
2.14 PILOTE HINCADO 25X25 ML ### 108,051 109,480 110,829 109,559 109,877 110,591 109,083
2.15 PILOTE HINCADO 30X30 ML ### 133,307 135,377 137,333 135,492 135,952 136,988 134,802
2.16 DADOS EN CONCRETO 3500PSI M3 ### 606,619 625,971 644,249 627,047 631,347 641,023 620,596
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 94,308 94,308 94,308 94,308 94,308 94,308 94,308

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 39,581 39,682 39,777 39,687 39,710 39,760 39,654
3.2 SIFÓN EN PVC 6" UN ### 202,557 202,658 202,753 202,664 202,686 202,737 202,630
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 475,621 484,269 511,433 490,531 489,150 511,643 481,867
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 235,673 238,388 242,555 239,027 239,352 242,242 237,634
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 269,853 274,394 281,200 275,412 275,984 280,662 273,133
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 355,475 363,196 373,006 364,391 365,669 371,938 361,052
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 109,695 109,695 109,924 109,764 109,725 109,944 109,695
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,310,972 1,310,972 1,313,261 1,311,669 1,311,271 1,313,460 1,310,972
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 119,003 120,118 121,171 120,180 120,428 120,985 119,808
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 74,763 75,351 75,907 75,384 75,514 75,809 75,188
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,719 29,032 29,327 29,049 29,119 29,275 28,945
3.12 TUBERÍA DRENAJE PVC 160 ML ### 46,092 46,405 46,700 46,422 46,492 46,648 46,318
3.13 TUBERÍA DRENAJE PVC 200 ML ### 60,388 60,826 61,239 60,850 60,947 61,166 60,704
3.14 TUBERÍA DRENAJE PVC 250 ML ### 82,509 83,010 83,482 83,038 83,149 83,399 82,871
3.15 TUBERÍA DRENAJE PVC 315 ML ### 113,999 114,437 114,850 114,461 114,558 114,777 114,315
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 977,833 982,837 987,563 983,115 984,227 986,729 981,447
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,379,798 1,389,806 1,399,258 1,390,362 1,392,586 1,397,590 1,387,026
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,794,188 1,814,204 1,833,106 1,815,316 1,819,762 1,829,770 1,808,644

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 43,428 43,428 43,428 43,428 43,428 43,428 43,428
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 57,194 57,194 57,194 57,194 57,194 57,194 57,194
4.3 COLUMNAS 3500 PSI M3 ### 835,800 855,153 873,430 856,228 860,528 870,204 849,777
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 269,056 290,098 311,667 292,498 294,156 309,065 285,623
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI
M2 ### 101,275 103,154 104,929 103,259 103,676 104,616 102,632

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI
M2 ### 119,316 121,571 123,700 121,696 122,197 123,324 120,944
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 134,240 137,247 140,086 137,414 138,082 139,585 136,412
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 141,621 144,815 147,831 144,992 145,702 147,299 143,928
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 162,114 166,060 169,786 166,279 167,156 169,129 164,964
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ###
p 180,252 184,762 189,020 185,012 186,014 188,269 183,509
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ###i 200,058 205,131 209,922 205,413 206,540 209,077 203,722
4.12 ENTREPISO VIGUETA PLACA M2 ###o 102,670 103,017 103,344 103,036 103,113 103,286 102,920
4.13 ESCALERA MACIZA 3500 PSI M3 ### 988,296 1,007,649 1,025,926 1,008,724 1,013,024 1,022,700 1,002,273
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 98,066 98,376 98,668 98,393 98,462 98,616 98,290
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 81,891 83,827 85,654 83,934 84,364 85,332 83,289
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 92,079 94,446 96,682 94,578 95,104 96,287 93,788
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 107,223 110,191 112,995 110,356 111,016 112,500 109,367
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 732,407 751,759 770,037 752,835 757,135 766,811 746,384
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 51,639 52,244 52,814 52,277 52,412 52,714 52,076
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 290,527 299,170 307,333 299,650 301,571 305,892 296,769
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,296 4,296 4,296 4,296 4,296 4,296 4,296
4.22 ACERO FIGURADO 60000 PSI KG ### 4,505 4,505 4,505 4,505 4,505 4,505 4,505
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,384 6,384 6,384 6,384 6,384 6,384 6,384
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 887,312 906,665 924,942 907,740 912,040 921,716 901,289
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 806,573 827,748 847,747 828,925 833,630 844,217 821,866
4.26 VIGA AÉREA 3500 PSI M3 ### 878,084 897,437 915,714 898,512 902,812 912,488 892,061
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 856,781 876,133 894,411 877,209 881,509 891,185 870,758
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,079,488 1,098,840 1,117,118 1,099,916 1,104,216 1,113,892 1,093,465
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 328,680 349,532 369,225 350,691 355,323 365,749 343,739

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 31,108 31,612 32,088 31,640 31,752 32,004 31,472
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 52,663 53,167 53,643 53,195 53,307 53,559 53,027
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,585 36,686 36,781 36,691 36,714 36,764 36,658
5.4 ARCOS EN LADRILLO PRENSADO ML ### 171,238 171,440 171,631 171,451 171,496 171,597 171,384
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 46,145 46,749 47,320 46,783 46,917 47,219 46,581
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,544 28,854 29,146 28,871 28,940 29,094 28,768
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 101,994 102,398 102,779 102,420 102,510 102,712 102,286
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 94,190 96,205 98,107 96,317 96,764 97,771 95,645
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 94,755 94,755 94,755 94,755 94,755 94,755 94,755
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,776 55,776 55,776 55,776 55,776 55,776 55,776
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 91,307 91,307 91,307 91,307 91,307 91,307 91,307
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,053 54,053 54,053 54,053 54,053 54,053 54,053
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 105,512 105,512 105,512 105,512 105,512 105,512 105,512
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,556 62,556 62,556 62,556 62,556 62,556 62,556
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 117,211 117,211 117,211 117,211 117,211 117,211 117,211
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,405 68,405 68,405 68,405 68,405 68,405 68,405
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,212 42,415 42,607 42,426 42,471 42,573 42,359
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,679 25,780 25,876 25,786 25,808 25,859 25,752
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 54,778 54,913 55,041 54,921 54,951 55,018 54,876
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,091 33,159 33,223 33,162 33,177 33,211 33,140
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 61,634 61,769 61,896 61,776 61,806 61,874 61,731
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,233 37,300 37,364 37,304 37,319 37,353 37,281
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 102,381 103,057 103,695 103,094 103,244 103,582 102,869
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 60,814 61,152 61,471 61,171 61,246 61,415 61,058
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 38,725 38,860 38,988 38,868 38,898 38,965 38,823
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,582 23,650 23,714 23,654 23,669 23,702 23,631
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 76,871 77,142 77,397 77,157 77,217 77,352 77,067
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,557 46,692 46,819 46,699 46,729 46,797 46,654
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 91,034 91,344 91,636 91,361 91,430 91,584 91,258
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 55,416 55,571 55,717 55,579 55,614 55,691 55,528
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 187,419 188,365 189,259 188,417 188,628 189,101 188,102
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 113,207 113,680 114,127 113,706 113,811 114,048 113,549
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 93,664 94,309 94,918 94,345 94,488 94,811 94,130
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ###
p 56,731 57,053 57,358 57,071 57,143 57,304 56,964
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ###i 48,547 48,849 49,135 48,866 48,933 49,085 48,765
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ###o 29,678 29,829 29,972 29,838 29,871 29,947 29,787
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 35,121 35,256 35,384 35,264 35,294 35,361 35,219
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,489 21,556 21,620 21,560 21,575 21,609 21,537
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 52,784 53,054 53,310 53,069 53,129 53,265 52,979
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,520 32,655 32,783 32,663 32,693 32,760 32,617
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 101,704 102,109 102,492 102,132 102,222 102,425 101,997
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,245 62,448 62,639 62,459 62,504 62,606 62,391
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 74,321 74,592 74,847 74,607 74,667 74,802 74,516
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,071 45,206 45,334 45,214 45,244 45,311 45,169
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 155,965 156,912 157,805 156,964 157,174 157,648 156,649
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 95,329 95,802 96,249 95,828 95,934 96,170 95,671
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 33,001 33,102 33,197 33,107 33,130 33,180 33,074
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,459 38,923 39,362 38,949 39,052 39,284 38,795
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,748 65,367 65,951 65,401 65,539 65,848 65,195
5.50 LAVADA DE FACHADA M2 ### 5,539 5,539 5,539 5,539 5,539 5,539 5,539
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 53,041 53,545 54,020 53,573 53,685 53,937 53,405
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,147 11,147 11,147 11,147 11,147 11,147 11,147
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,627 14,627 14,627 14,627 14,627 14,627 14,627
5.54 ANCLAJE 1/2" L=50CM UN ### 19,082 19,082 19,082 19,082 19,082 19,082 19,082
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,540 26,540 26,540 26,540 26,540 26,540 26,540
5.56 ANCLAJE 3/4" L=70CM UN ### 39,344 39,344 39,344 39,344 39,344 39,344 39,344
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,121 5,264 5,399 5,272 5,304 5,376 5,224

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,994 16,994 16,994 16,994 16,994 16,994 16,994
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,019 6,120 6,215 6,125 6,148 6,198 6,092
6.3 FILOS O DILATACIONES S/MURO ML ### 7,276 7,377 7,472 7,382 7,405 7,455 7,349
6.4 GOTERA EN MORTERO 1:4 ML ### 8,594 8,695 8,790 8,701 8,723 8,773 8,667
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,072 7,072 7,072 7,072 7,072 7,072 7,072
6.6 MALLA BAJO ENTRAMADO M2 ### 14,355 14,355 14,355 14,355 14,355 14,355 14,355
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 26,161 26,613 27,039 26,638 26,738 26,964 26,487
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,830 16,056 16,269 16,069 16,119 16,232 15,993
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,052 22,336 22,604 22,352 22,415 22,557 22,257
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,447 13,589 13,723 13,597 13,628 13,699 13,550
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 22,037 22,488 22,915 22,513 22,614 22,839 22,363
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,439 13,665 13,878 13,678 13,728 13,841 13,602
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,052 22,336 22,604 22,352 22,415 22,557 22,257
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,447 13,589 13,723 13,597 13,628 13,699 13,550
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 23,000 23,322 23,626 23,340 23,411 23,572 23,233
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,920 14,081 14,233 14,090 14,125 14,206 14,036
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,373 18,589 18,794 18,601 18,649 18,758 18,529
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,302 11,410 11,512 11,416 11,440 11,494 11,380
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 18,361 18,705 19,030 18,724 18,801 18,973 18,609
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,296 11,468 11,630 11,477 11,515 11,601 11,420
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,877 23,161 23,429 23,177 23,240 23,382 23,082
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,838 13,980 14,114 13,988 14,020 14,091 13,941
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 22,861 23,313 23,739 23,338 23,438 23,664 23,188
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,830 14,056 14,269 14,069 14,119 14,232 13,993
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 19,008 19,352 19,677 19,371 19,448 19,620 19,256
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,600 11,772 11,935 11,782 11,820 11,906 11,724
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 23,804 24,256 24,682 24,281 24,381 24,607 24,130
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,730 14,956 15,169 14,969 15,019 15,132 14,893
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
7 CUBIERTAS
p
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ###i 27,968 28,374 28,757 28,396 28,486 28,689 28,261
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA o
7.2 IMPERMEABLE)
M2 ### 85,819 86,826 87,778 86,882 87,106 87,610 86,547
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 56,914 56,914 56,914 56,914 56,914 56,914 56,914
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,924 22,924 22,924 22,924 22,924 22,924 22,924
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,909 35,909 35,909 35,909 35,909 35,909 35,909
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 82,954 82,954 82,954 82,954 82,954 82,954 82,954
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 65,111 65,111 65,111 65,111 65,111 65,111 65,111
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,163 38,163 38,163 38,163 38,163 38,163 38,163
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 86,903 86,903 86,903 86,903 86,903 86,903 86,903
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 103,635 103,635 103,635 103,635 103,635 103,635 103,635
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 151,972 151,972 151,972 151,972 151,972 151,972 151,972
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 60,564 60,564 60,564 60,564 60,564 60,564 60,564
7.13 CANAL PVC AMAZONAS ML ### 84,440 84,440 84,440 84,440 84,440 84,440 84,440
7.14 CANAL PVC RAINGO ML ### 76,893 76,893 76,893 76,893 76,893 76,893 76,893
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 135,235 135,235 135,235 135,235 135,235 135,235 135,235
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 78,813 78,813 78,813 78,813 78,813 78,813 78,813
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 58,046 58,046 58,046 58,046 58,046 58,046 58,046
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,649 33,649 33,649 33,649 33,649 33,649 33,649
7.19000000000001 TEJA DE BARRO M2 ### 61,611 62,116 62,592 62,144 62,256 62,508 61,975
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 48,369 48,369 48,369 48,369 48,369 48,369 48,369
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 44,381 44,381 44,381 44,381 44,381 44,381 44,381
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 37,870 37,870 37,870 37,870 37,870 37,870 37,870
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 37,043 37,043 37,043 37,043 37,043 37,043 37,043
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,317 37,317 37,317 37,317 37,317 37,317 37,317
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 52,162 52,162 52,162 52,162 52,162 52,162 52,162
7.26 TEJA PLÁSTICA No.6 M2 ### 45,947 45,947 45,947 45,947 45,947 45,947 45,947
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 83,594 83,594 83,594 83,594 83,594 83,594 83,594
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 153,732 153,732 153,732 153,732 153,732 153,732 153,732
7.29000000000001 TEJA SIN TRASLAPO M2 ### 69,345 69,345 69,345 69,345 69,345 69,345 69,345
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,507 44,507 44,507 44,507 44,507 44,507 44,507
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,707 34,707 34,707 34,707 34,707 34,707 34,707
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2",
7.32 15 MM) M2 ### 59,818 59,818 59,818 59,818 59,818 59,818 59,818
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,973 20,973 20,973 20,973 20,973 20,973 20,973
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,087 25,087 25,087 25,087 25,087 25,087 25,087
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,074 27,074 27,074 27,074 27,074 27,074 27,074
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 34,667 34,667 34,667 34,667 34,667 34,667 34,667
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,063 23,063 23,063 23,063 23,063 23,063 23,063
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,203 54,203 54,203 54,203 54,203 54,203 54,203
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 362,902 362,902 362,902 362,902 362,902 362,902 362,902
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 425,979 425,979 425,979 425,979 425,979 425,979 425,979
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 278,336 278,336 278,336 278,336 278,336 278,336 278,336
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 296,638 296,638 296,638 296,638 296,638 296,638 296,638

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 466,570 487,275 506,828 488,425 493,025 503,378 481,523
8.2 CONCRETO 3500 PSI M3 ### 406,600 425,389 443,134 426,433 430,608 440,002 420,170
8.3 CONCRETO 3000 PSI M3 ### 403,814 422,985 441,091 424,051 428,310 437,896 417,660
8.4 CONCRETO 2500 PSI M3 ### 361,433 381,578 400,603 382,698 387,173 397,246 375,982
8.5 CONCRETO 2000 PSI M3 ### 335,850 356,104 375,232 357,230 361,729 371,857 350,478
8.6 CONCRETO 1500 PSI M3 ### 303,089 323,334 342,453 324,459 328,956 339,079 317,710
8.7 MORTERO SECO 1:10 M3 ### 243,341 257,264 270,413 258,037 261,131 268,093 253,396
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 460,894 474,413 487,180 475,163 478,168 484,928 470,657
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ###
p 460,147 481,649 501,957 482,845 487,622 498,374 475,676
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ###i 520,221 540,330 559,323 541,448 545,916 555,972 534,744
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ###o 750,101 770,210 789,203 771,328 775,796 785,852 764,624

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 127,072 127,072 127,072 127,072 127,072 127,072 127,072
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,102 4,203 4,298 4,208 4,231 4,281 4,175
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 142,724 142,724 142,724 142,724 142,724 142,724 142,724
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 174,192 174,192 174,192 174,192 174,192 174,192 174,192
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 250,946 250,946 250,946 250,946 250,946 250,946 250,946
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 279,170 279,170 279,170 279,170 279,170 279,170 279,170
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 307,429 307,429 307,429 307,429 307,429 307,429 307,429
9.8 HOJA PUERTA FORTEC 0.81 UN ### 203,840 203,840 203,840 203,840 203,840 203,840 203,840
9.9 HOJA PUERTA FORTEC 0.91 UN ### 230,987 230,987 230,987 230,987 230,987 230,987 230,987
9.10 HOJA PUERTA FORTEC 1.50 UN ### 339,574 339,574 339,574 339,574 339,574 339,574 339,574
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 129,187 129,187 129,187 129,187 129,187 129,187 129,187
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 171,264 171,264 171,264 171,264 171,264 171,264 171,264
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 190,267 190,267 190,267 190,267 190,267 190,267 190,267
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 483,450 483,450 483,450 483,450 483,450 483,450 483,450
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 43,598 43,598 43,598 43,598 43,598 43,598 43,598
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,465 27,465 27,465 27,465 27,465 27,465 27,465
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 103,125 103,125 103,125 103,125 103,125 103,125 103,125
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 123,875 123,875 123,875 123,875 123,875 123,875 123,875
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 96,321 96,321 96,321 96,321 96,321 96,321 96,321
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,138 30,138 30,138 30,138 30,138 30,138 30,138
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,138 30,138 30,138 30,138 30,138 30,138 30,138
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,591 28,591 28,591 28,591 28,591 28,591 28,591
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 43,838 43,838 43,838 43,838 43,838 43,838 43,838
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 54,119 54,119 54,119 54,119 54,119 54,119 54,119
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 65,087 65,087 65,087 65,087 65,087 65,087 65,087
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 78,110 78,110 78,110 78,110 78,110 78,110 78,110
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 365,822 365,822 365,822 365,822 365,822 365,822 365,822
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 256,151 256,151 256,151 256,151 256,151 256,151 256,151
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 34,926 34,926 34,926 34,926 34,926 34,926 34,926
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 44,523 44,523 44,523 44,523 44,523 44,523 44,523
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 54,119 54,119 54,119 54,119 54,119 54,119 54,119
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 67,828 67,828 67,828 67,828 67,828 67,828 67,828

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 78,641 78,641 78,641 78,641 78,641 78,641 78,641
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 216,498 216,498 216,498 216,498 216,498 216,498 216,498
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 83,609 83,609 83,609 83,609 83,609 83,609 83,609
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 150,841 150,841 150,841 150,841 150,841 150,841 150,841
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 141,404 141,404 141,404 141,404 141,404 141,404 141,404
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 92,862 92,862 92,862 92,862 92,862 92,862 92,862
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 218,202 218,202 218,202 218,202 218,202 218,202 218,202
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 114,040 114,040 114,040 114,040 114,040 114,040 114,040
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,864 6,864 6,864 6,864 6,864 6,864 6,864
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL
10.10 GALVANIZADO 2")
M2 ### 104,267 104,267 104,267 104,267 104,267 104,267 104,267
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 124,709 124,709 124,709 124,709 124,709 124,709 124,709
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,894 42,894 42,894 42,894 42,894 42,894 42,894
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 551,107 551,107 551,107 551,107 551,107 551,107 551,107
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 198,955 198,955 198,955 198,955 198,955 198,955 198,955
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ###
p 224,661 224,661 224,661 224,661 224,661 224,661 224,661
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ###i 503,352 503,352 503,352 503,352 503,352 503,352 503,352
o
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 134,103 134,103 134,103 134,103 134,103 134,103 134,103
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 401,493 401,493 401,493 401,493 401,493 401,493 401,493
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,262 6,262 6,262 6,262 6,262 6,262 6,262
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 283,279 283,279 283,279 283,279 283,279 283,279 283,279
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 127,382 127,382 127,382 127,382 127,382 127,382 127,382
10.21 REJILLA PISO 0.30 M M2 ### 89,029 89,029 89,029 89,029 89,029 89,029 89,029
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 92,115 92,115 92,115 92,115 92,115 92,115 92,115

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS,


10.23 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 10,994 10,994 10,994 10,994 10,994 10,994 10,994
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,


10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 12,170 12,170 12,170 12,170 12,170 12,170 12,170
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.25 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
KG ### 9,727 9,727 9,727 9,727 9,727 9,727 9,727
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 230,720 230,720 230,720 230,720 230,720 230,720 230,720
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 277,035 277,035 277,035 277,035 277,035 277,035 277,035
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,924 22,924 22,924 22,924 22,924 22,924 22,924
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,909 35,909 35,909 35,909 35,909 35,909 35,909
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,593 34,593 34,593 34,593 34,593 34,593 34,593
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,213 44,213 44,213 44,213 44,213 44,213 44,213
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 90,778 90,778 90,778 90,778 90,778 90,778 90,778
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 232,103 232,103 232,103 232,103 232,103 232,103 232,103
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,896 46,896 46,896 46,896 46,896 46,896 46,896
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 36,632 36,632 36,632 36,632 36,632 36,632 36,632
11.13 NIPLE PASAMURO 2" UN ### 70,164 70,164 70,164 70,164 70,164 70,164 70,164
11.14 NIPLE PASAMURO 4" UN ### 104,694 104,694 104,694 104,694 104,694 104,694 104,694
11.15 PUNTO AGUA CALIENTE CPVC UN ### 87,871 87,871 87,871 87,871 87,871 87,871 87,871
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 64,746 64,746 64,746 64,746 64,746 64,746 64,746
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 68,718 68,718 68,718 68,718 68,718 68,718 68,718
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 86,802 86,802 86,802 86,802 86,802 86,802 86,802
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 69,546 69,546 69,546 69,546 69,546 69,546 69,546
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 86,503 86,503 86,503 86,503 86,503 86,503 86,503
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 92,379 92,379 92,379 92,379 92,379 92,379 92,379
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 75,994 75,994 75,994 75,994 75,994 75,994 75,994
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,934 12,934 12,934 12,934 12,934 12,934 12,934
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,110 18,110 18,110 18,110 18,110 18,110 18,110
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,665 23,665 23,665 23,665 23,665 23,665 23,665
11.26 RED SUMINISTRO PVC 1" ML ### 14,681 14,681 14,681 14,681 14,681 14,681 14,681
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,812 8,812 8,812 8,812 8,812 8,812 8,812
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 52,467 52,467 52,467 52,467 52,467 52,467 52,467
11.29 RED SUMINISTRO PVC 2" ML ### 33,645 33,645 33,645 33,645 33,645 33,645 33,645
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,006 11,006 11,006 11,006 11,006 11,006 11,006
11.31 RED SANITARIA PVC-S 2" ML ### 26,083 26,083 26,083 26,083 26,083 26,083 26,083
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
11.32 RED SANITARIA PVC-S 3" ML ###
p 36,110 36,110 36,110 36,110 36,110 36,110 36,110
11.33 RED SANITARIA PVC-S 4" ML ###i 48,950 48,950 48,950 48,950 48,950 48,950 48,950
11.34 RED SANITARIA PVC-S 6" ML ###o 90,966 90,966 90,966 90,966 90,966 90,966 90,966
11.35 REGISTRO 1" UN ### 110,957 110,957 110,957 110,957 110,957 110,957 110,957
11.36 REGISTRO 1/2" UN ### 61,939 61,939 61,939 61,939 61,939 61,939 61,939
11.37 REGISTRO 3/4" UN ### 78,661 78,661 78,661 78,661 78,661 78,661 78,661
11.38 REGISTRO 1 1/2" UN ### 189,410 189,410 189,410 189,410 189,410 189,410 189,410
11.39 REGISTRO 2 1/2" UN ### 389,632 389,632 389,632 389,632 389,632 389,632 389,632
11.40 REGISTRO 2" UN ### 288,261 288,261 288,261 288,261 288,261 288,261 288,261
11.41 REVENTILACIÓN 2" ML ### 18,241 18,241 18,241 18,241 18,241 18,241 18,241
11.42 REVENTILACIÓN 3" ML ### 22,999 22,999 22,999 22,999 22,999 22,999 22,999
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 178,782 178,782 178,782 178,782 178,782 178,782 178,782
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 290,135 290,135 290,135 290,135 290,135 290,135 290,135
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 482,166 482,166 482,166 482,166 482,166 482,166 482,166
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 41,553 41,553 41,553 41,553 41,553 41,553 41,553
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 48,985 48,985 48,985 48,985 48,985 48,985 48,985
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 63,141 63,141 63,141 63,141 63,141 63,141 63,141
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 71,402 71,402 71,402 71,402 71,402 71,402 71,402

11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 91,986 91,986 91,986 91,986 91,986 91,986 91,986

11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 107,031 107,031 107,031 107,031 107,031 107,031 107,031
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 158,396 158,396 158,396 158,396 158,396 158,396 158,396
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,197 64,197 64,197 64,197 64,197 64,197 64,197
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,453 64,453 64,453 64,453 64,453 64,453 64,453
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,239 41,239 41,239 41,239 41,239 41,239 41,239
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 50,686 50,686 50,686 50,686 50,686 50,686 50,686
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,269 4,269 4,269 4,269 4,269 4,269 4,269
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,715 6,715 6,715 6,715 6,715 6,715 6,715
11.59 GABINETE TIPO III UN ### 1,040,315 1,040,315 1,040,315 1,040,315 1,040,315 1,040,315 1,040,315
11.60 GABINETE TIPO I UN ### 796,267 796,267 796,267 796,267 796,267 796,267 796,267
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,662,778 2,662,778 2,662,778 2,662,778 2,662,778 2,662,778 2,662,778
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,221,288 2,221,288 2,221,288 2,221,288 2,221,288 2,221,288 2,221,288
11.63 VÁLVULA MARIPOSA 3" UN ### 649,804 649,804 649,804 649,804 649,804 649,804 649,804
11.64 VÁLVULA MARIPOSA 4" UN ### 838,744 838,744 838,744 838,744 838,744 838,744 838,744
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 320,741 320,741 320,741 320,741 320,741 320,741 320,741

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 373,853 373,853 373,853 373,853 373,853 373,853 373,853
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,388 59,388 59,388 59,388 59,388 59,388 59,388
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 70,191 70,191 70,191 70,191 70,191 70,191 70,191
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 78,070 78,070 78,070 78,070 78,070 78,070 78,070
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 91,805 91,805 91,805 91,805 91,805 91,805 91,805
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,903 55,903 55,903 55,903 55,903 55,903 55,903
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 63,672 63,672 63,672 63,672 63,672 63,672 63,672
12.8 STRIP TELEFÓNICO 10 PARES UN ### 147,681 147,681 147,681 147,681 147,681 147,681 147,681
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 57,352 57,352 57,352 57,352 57,352 57,352 57,352
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 131,647 131,647 131,647 131,647 131,647 131,647 131,647
12.11 SALIDA T.V PVC COMPLETA. UN ### 78,847 78,847 78,847 78,847 78,847 78,847 78,847
12.12 SALIDA BIFÁSICA C.N. UN ### 46,742 46,742 46,742 46,742 46,742 46,742 46,742
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 98,844 98,844 98,844 98,844 98,844 98,844 98,844
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 422,372 422,372 422,372 422,372 422,372 422,372 422,372
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 561,903 561,903 561,903 561,903 561,903 561,903 561,903
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,636 3,636 3,636 3,636 3,636 3,636 3,636
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,804 4,804 4,804 4,804 4,804 4,804 4,804
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
12.18 TUBERÍA PVC CONDUIT 1" ML ###
p 7,465 7,465 7,465 7,465 7,465 7,465 7,465
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ###i 13,361 13,361 13,361 13,361 13,361 13,361 13,361
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ###o 280,387 280,387 280,387 280,387 280,387 280,387 280,387
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 79,454 79,454 79,454 79,454 79,454 79,454 79,454
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 107,168 107,168 107,168 107,168 107,168 107,168 107,168
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,392 44,392 44,392 44,392 44,392 44,392 44,392
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,441,655 1,441,655 1,441,655 1,441,655 1,441,655 1,441,655 1,441,655
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,068,405 1,068,405 1,068,405 1,068,405 1,068,405 1,068,405 1,068,405
12.26 POSTE METÁLICO 6M UN ### 1,324,449 1,324,449 1,324,449 1,324,449 1,324,449 1,324,449 1,324,449
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 614,975 614,975 614,975 614,975 614,975 614,975 614,975
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 113,128 113,128 113,128 113,128 113,128 113,128 113,128
12.29 LUMINARIA 70W SODIO UN ### 515,713 515,713 515,713 515,713 515,713 515,713 515,713
12.30 LUMINARIA 150W SODIO UN ### 644,830 644,830 644,830 644,830 644,830 644,830 644,830
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,700,810 1,700,810 1,700,810 1,700,810 1,700,810 1,700,810 1,700,810
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,252,894 1,252,894 1,252,894 1,252,894 1,252,894 1,252,894 1,252,894

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 42,515 43,288 44,019 43,331 43,503 43,890 43,073
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,923 42,696 43,427 42,739 42,911 43,298 42,481
13.3 ALISTADO PARA LISTÓN M2 ### 15,702 15,857 16,003 15,866 15,900 15,977 15,814
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 31,421 32,968 34,429 33,054 33,398 34,171 32,538
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 89,807 91,354 92,815 91,440 91,784 92,557 90,924
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 28,127 28,532 28,915 28,555 28,645 28,847 28,420
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 60,164 62,178 64,081 62,290 62,738 63,745 61,619
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 83,096 86,319 89,363 86,498 87,214 88,826 85,424
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,456 31,456 31,456 31,456 31,456 31,456 31,456
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,074 24,074 24,074 24,074 24,074 24,074 24,074
13.11 PERMA PLY 2 CAPAS M2 ### 28,347 28,347 28,347 28,347 28,347 28,347 28,347
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 48,879 50,692 52,405 50,793 51,196 52,103 50,189
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 57,212 59,428 61,521 59,551 60,044 61,152 58,813
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 82,742 86,166 89,401 86,357 87,118 88,830 85,215
13.15 TRITURADO FINO 1/2 M3 ### 93,151 105,820 117,785 106,524 109,339 115,674 102,300
13.16 TRITURADO GRUESO 3/4 M3 ### 99,768 110,777 130,327 114,174 115,028 129,288 107,719

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 60,000 60,310 60,602 60,327 60,396 60,550 60,224
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 36,011 36,165 36,311 36,174 36,208 36,286 36,122
14.3 ADOQUÍN CONCRETO 6CM M2 ### 69,248 70,021 70,752 70,064 70,236 70,623 69,807
14.4 ADOQUÍN CONCRETO 8CM M2 ### 72,648 73,421 74,152 73,464 73,636 74,023 73,207
14.5 ADOQUÍN GRES PEATONAL M2 ### 77,057 77,831 78,561 77,874 78,045 78,432 77,616
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 78,555 78,864 79,156 78,881 78,950 79,105 78,778
14.7 GRAVILLA PARA GRADAS ML ### 40,048 40,351 40,637 40,368 40,435 40,587 40,267
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 171,763 173,155 174,470 173,232 173,541 174,238 172,768
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 50,174 50,935 51,654 50,978 51,147 51,527 50,724
14.10 GUARDAESCOBA EN GRANITO ML ### 46,309 46,309 46,309 46,309 46,309 46,309 46,309
14.11 GUARDAESCOBA EN GRAVILLA ML ### 11,157 11,460 11,746 11,477 11,544 11,696 11,376
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,677 9,677 9,677 9,677 9,677 9,677 9,677
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,965 12,965 12,965 12,965 12,965 12,965 12,965
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,025 11,025 11,025 11,025 11,025 11,025 11,025
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,293 18,293 18,293 18,293 18,293 18,293 18,293
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,396 35,396 35,396 35,396 35,396 35,396 35,396
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,830 9,830 9,830 9,830 9,830 9,830 9,830
14.18 LISTÓN M.H. AMARILLO M2 ### 77,648 77,648 77,648 77,648 77,648 77,648 77,648
14.19 PASO ESCALERA GRANITO ML ### 125,735 126,818 127,841 126,878 127,119 127,661 126,518
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
14.20 PIRLANES ALUMINIO ML ###
p 8,084 8,084 8,084 8,084 8,084 8,084 8,084
14.21 PIRLANES LADRILLO ML ###i 33,760 33,961 34,152 33,973 34,017 34,118 33,905
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ###o 47,550 47,550 47,550 47,550 47,550 47,550 47,550
14.23 PISO VINILO TRÁFICO PESADO M2 ### 55,139 55,139 55,139 55,139 55,139 55,139 55,139
14.24 PULIDA LACADA PISO MADERA M2 ### 51,549 51,549 51,549 51,549 51,549 51,549 51,549
14.25 TABLETA DE GRES 25X25 M2 ### 52,189 52,498 52,790 52,515 52,584 52,739 52,412
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,395 58,705 58,997 58,722 58,791 58,945 58,619
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,598 11,598 11,598 11,598 11,598 11,598 11,598
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 51,667 51,970 52,255 51,986 52,054 52,205 51,886
14.29 JABONERA PORCELANA ACUARIO UN ### 21,400 21,400 21,400 21,400 21,400 21,400 21,400
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA
14.30 SIMPLE) UN ### 127,593 127,593 127,593 127,593 127,593 127,593 127,593
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,554 10,554 10,554 10,554 10,554 10,554 10,554
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,424 23,424 23,424 23,424 23,424 23,424 23,424
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,169 15,169 15,169 15,169 15,169 15,169 15,169
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,748 14,748 14,748 14,748 14,748 14,748 14,748
14.35 REMATES BOCEL ALUMINIO ML ### 9,104 9,104 9,104 9,104 9,104 9,104 9,104
14.36 REMATES BOCEL PORCELANA ML ### 9,258 9,258 9,258 9,258 9,258 9,258 9,258
14.37 TAPA REGISTRO 20X20 UN ### 19,906 19,906 19,906 19,906 19,906 19,906 19,906
14.38 TAPA REGISTRO 6X6 UN ### 18,175 18,175 18,175 18,175 18,175 18,175 18,175
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 19,138 19,138 19,138 19,138 19,138 19,138 19,138
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 22,124 22,124 22,124 22,124 22,124 22,124 22,124
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 68,139 68,449 68,741 68,466 68,535 68,689 68,363
14.42 MEDIA CAÑA EN GRANITO ML ### 79,779 79,779 79,779 79,779 79,779 79,779 79,779
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,561 36,561 36,561 36,561 36,561 36,561 36,561
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,881 13,881 13,881 13,881 13,881 13,881 13,881
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 104,380 104,380 104,380 104,380 104,380 104,380 104,380
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 126,690 126,690 126,690 126,690 126,690 126,690 126,690

15 CIELO RASO
15.1 APLIQUE YESO ML ### 75,011 75,011 75,011 75,011 75,011 75,011 75,011
15.2 ARMADURA MADERA Y MALLA M2 ### 38,137 38,137 38,137 38,137 38,137 38,137 38,137
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 57,969 57,969 57,969 57,969 57,969 57,969 57,969
15.4 CIELO RASO DURACUSTIC M2 ### 70,851 70,851 70,851 70,851 70,851 70,851 70,851
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 52,991 52,991 52,991 52,991 52,991 52,991 52,991
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 97,742 97,742 97,742 97,742 97,742 97,742 97,742
15.7 CORNISAS YESO ML ### 50,274 50,274 50,274 50,274 50,274 50,274 50,274
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 107,768 107,768 107,768 107,768 107,768 107,768 107,768
15.9 MALLA CON VENA M2 ### 14,257 14,257 14,257 14,257 14,257 14,257 14,257

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
16.2 DISTANCIA MENOR DE 5 KM)
M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 87,039 87,039 127,464 99,343 92,312 130,979 87,039
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 114,658 130,987 146,410 131,895 135,524 143,689 126,452
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 174,589 207,984 246,651 215,014 209,741 244,893 204,468
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
16.11 AFRIMADO (NORMA INVIAS 311) M3 ###
p 78,036 78,036 118,461 90,340 90,340 118,461 78,036
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ###i 164,310 150,249 236,371 176,613 167,825 220,553 159,037
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ###o 171,023 204,418 243,085 211,448 206,175 241,327 200,902

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 311,575 311,575 311,575 311,575 311,575 311,575 311,575
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 914,074 914,074 914,074 914,074 914,074 914,074 914,074
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 496,230 496,230 496,230 496,230 496,230 496,230 496,230
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 145,826 145,826 145,826 145,826 145,826 145,826 145,826
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 202,853 202,853 202,853 202,853 202,853 202,853 202,853
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 188,561 188,561 188,561 188,561 188,561 188,561 188,561
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 412,211 412,211 412,211 412,211 412,211 412,211 412,211
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,050,812 1,050,812 1,050,812 1,050,812 1,050,812 1,050,812 1,050,812
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 300,096 300,096 300,096 300,096 300,096 300,096 300,096
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 213,557 213,557 213,557 213,557 213,557 213,557 213,557
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 86,316 86,316 86,316 86,316 86,316 86,316 86,316
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm
17.12 (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 257,748 257,748 257,748 257,748 257,748 257,748 257,748

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60


17.13 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 378,550 378,550 378,550 378,550 378,550 378,550 378,550

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,760 8,760 8,760 8,760 8,760 8,760 8,760
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,229 3,229 3,229 3,229 3,229 3,229 3,229
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,762 11,762 11,762 11,762 11,762 11,762 11,762
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,156 44,156 44,156 44,156 44,156 44,156 44,156
18.5 CARBURO SOBRE PAÑETES M2 ### 6,159 6,159 6,159 6,159 6,159 6,159 6,159
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 67,504 67,504 67,504 67,504 67,504 67,504 67,504
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,678 3,678 3,678 3,678 3,678 3,678 3,678
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,905 2,905 2,905 2,905 2,905 2,905 2,905
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,651 14,651 14,651 14,651 14,651 14,651 14,651
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,231 4,231 4,231 4,231 4,231 4,231 4,231
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,443 15,443 15,443 15,443 15,443 15,443 15,443
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,962 5,962 5,962 5,962 5,962 5,962 5,962
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,802 6,802 6,802 6,802 6,802 6,802 6,802
18.14 ESTUCO M2 ### 7,433 7,433 7,433 7,433 7,433 7,433 7,433
18.15 ESTUCO (LINEAL) ML ### 4,665 4,665 4,665 4,665 4,665 4,665 4,665
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,332 16,332 16,332 16,332 16,332 16,332 16,332
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,158 10,158 10,158 10,158 10,158 10,158 10,158
18.18 LACA PISOS MADERA M2 ### 24,091 24,091 24,091 24,091 24,091 24,091 24,091
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,832 2,832 2,832 2,832 2,832 2,832 2,832
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,660 12,660 12,660 12,660 12,660 12,660 12,660
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,421 3,421 3,421 3,421 3,421 3,421 3,421
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,224 13,224 13,224 13,224 13,224 13,224 13,224
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,450 7,450 7,450 7,450 7,450 7,450 7,450
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,701 4,701 4,701 4,701 4,701 4,701 4,701
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,720 22,720 22,720 22,720 22,720 22,720 22,720
18.26 PINTURA EPÓXICA M2 ### 13,378 13,378 13,378 13,378 13,378 13,378 13,378
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,289 8,289 8,289 8,289 8,289 8,289 8,289

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,210,648 6,210,648 6,210,648 6,210,648 6,210,648 6,210,648 6,210,648
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA
19.2 MOVILIZAR (PAR)
UN ### 10,973,309 10,973,309 10,973,309 10,973,309 10,973,309 10,973,309 10,973,309
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,871,994 2,871,994 2,871,994 2,871,994 2,871,994 2,871,994 2,871,994
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ###
p 9,385,237 9,385,237 9,385,237 9,385,237 9,385,237 9,385,237 9,385,237
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ###i 8,787,640 8,787,640 8,787,640 8,787,640 8,787,640 8,787,640 8,787,640
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ###o 2,832 2,832 2,832 2,832 2,832 2,832 2,832
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 882,802 882,802 882,802 882,802 882,802 882,802 882,802
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 88,015 88,015 88,015 88,015 88,015 88,015 88,015
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,595,407 1,595,614 1,595,809 1,595,625 1,595,671 1,595,775 1,595,556
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 694,990 699,782 704,309 700,049 701,114 703,510 698,451

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,265 30,265 30,265 30,265 30,265 30,265 30,265
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,893 44,893 44,893 44,893 44,893 44,893 44,893
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 55,638 55,638 55,638 55,638 55,638 55,638 55,638
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,225 18,225 18,225 18,225 18,225 18,225 18,225
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,064 22,064 22,064 22,064 22,064 22,064 22,064
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,049 30,049 30,049 30,049 30,049 30,049 30,049
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,944 26,944 26,944 26,944 26,944 26,944 26,944
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,417 28,417 28,417 28,417 28,417 28,417 28,417
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,513 35,513 35,513 35,513 35,513 35,513 35,513
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,209 18,209 18,209 18,209 18,209 18,209 18,209
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,831 23,831 23,831 23,831 23,831 23,831 23,831
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,579 36,579 36,579 36,579 36,579 36,579 36,579
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 279,369 279,369 279,369 279,369 279,369 279,369 279,369
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 321,463 321,463 321,463 321,463 321,463 321,463 321,463
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 335,377 335,377 335,377 335,377 335,377 335,377 335,377
20.16 ACOMETIDA GAS 1/2" ML ### 311,764 311,764 311,764 311,764 311,764 311,764 311,764

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 227,709 227,709 227,709 227,709 227,709 227,709 227,709
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 34,791 34,791 34,791 34,791 34,791 34,791 34,791
21.3 SIRENA DE 110 V UN ### 106,664 106,664 106,664 106,664 106,664 106,664 106,664
21.4 CÁMARA CCTV UN ### 273,688 273,688 273,688 273,688 273,688 273,688 273,688
21.5 PARLANTE-CIELO FALSO UN ### 53,985 53,985 53,985 53,985 53,985 53,985 53,985
21.6 AMPLIFICADOR 100W UN ### 590,254 590,254 590,254 590,254 590,254 590,254 590,254
21.7 AMPLIFICADOR 300W UN ### 1,457,342 1,457,342 1,457,342 1,457,342 1,457,342 1,457,342 1,457,342
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,618 47,618 47,618 47,618 47,618 47,618 47,618
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 227,396 227,396 227,396 227,396 227,396 227,396 227,396
21.10 TOMA PARA MICRÓFONO UN ### 45,887 45,887 45,887 45,887 45,887 45,887 45,887
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,887 3,887 3,887 3,887 3,887 3,887 3,887
21.12 SPLITERS UN ### 6,485 6,485 6,485 6,485 6,485 6,485 6,485
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,638 19,638 19,638 19,638 19,638 19,638 19,638
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,657 25,657 25,657 25,657 25,657 25,657 25,657
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,277 33,277 33,277 33,277 33,277 33,277 33,277
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 126,299 126,299 126,299 126,299 126,299 126,299 126,299
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,968 32,968 32,968 32,968 32,968 32,968 32,968
21.18 BANDEJA PORTACABLES PARA RACK UN ### 107,485 107,485 107,485 107,485 107,485 107,485 107,485
21.19 RACK 2' X 24" UN ### 191,878 191,878 191,878 191,878 191,878 191,878 191,878
21.20 RACK 3' X 24" UN ### 299,107 299,107 299,107 299,107 299,107 299,107 299,107
21.21 RACK 5' X 24" UN ### 372,651 372,651 372,651 372,651 372,651 372,651 372,651
21.22 RACK 7' X 24" UN ### 406,584 406,584 406,584 406,584 406,584 406,584 406,584
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 598,844 598,844 598,844 598,844 598,844 598,844 598,844
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 353,759 353,759 353,759 353,759 353,759 353,759 353,759
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 107,081 107,081 107,081 107,081 107,081 107,081 107,081
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,210 14,210 14,210 14,210 14,210 14,210 14,210
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,004 29,004 29,004 29,004 29,004 29,004 29,004
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,195 5,195 5,195 5,195 5,195 5,195 5,195
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
21.29 CANALETA METÁLICA 4X6 CMS ML ###
p 36,758 36,758 36,758 36,758 36,758 36,758 36,758
21.30 CANALETA METÁLICA 4X10 CMS ML ###i 38,375 38,375 38,375 38,375 38,375 38,375 38,375
21.31 CANALETA METÁLICA 6X10 CMS ML ###o 39,184 39,184 39,184 39,184 39,184 39,184 39,184
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,577 25,577 25,577 25,577 25,577 25,577 25,577
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,238 28,238 28,238 28,238 28,238 28,238 28,238
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,355 29,355 29,355 29,355 29,355 29,355 29,355
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 49,004 49,004 49,004 49,004 49,004 49,004 49,004
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 631,652 631,652 631,652 631,652 631,652 631,652 631,652
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 325,452 325,452 325,452 325,452 325,452 325,452 325,452
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 92,546 92,546 92,546 92,546 92,546 92,546 92,546
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,912 1,912 1,912 1,912 1,912 1,912 1,912
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,813 8,813 8,813 8,813 8,813 8,813 8,813
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,077 13,077 13,077 13,077 13,077 13,077 13,077
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,771 21,771 21,771 21,771 21,771 21,771 21,771
21.43 CABLE TELEVISIÓN RG6 ML ### 4,059 4,059 4,059 4,059 4,059 4,059 4,059
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,624 23,624 23,624 23,624 23,624 23,624 23,624
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,199 34,199 34,199 34,199 34,199 34,199 34,199
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,273 20,273 20,273 20,273 20,273 20,273 20,273
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,962 15,962 15,962 15,962 15,962 15,962 15,962
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 635,016 635,016 635,016 635,016 635,016 635,016 635,016
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
URBANISMO p
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 27,919 27,919 27,919 27,919 27,919 27,919 27,919
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 93,032 93,032 93,032 93,032 93,032 93,032 93,032
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 522,552 522,552 522,552 522,552 522,552 522,552 522,552
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,115,229 1,115,229 1,115,229 1,115,229 1,115,229 1,115,229 1,115,229
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 128,055 128,055 128,055 128,055 128,055 128,055 128,055
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 778,469 778,469 778,469 778,469 778,469 778,469 778,469
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,674,450 1,674,450 1,674,450 1,674,450 1,674,450 1,674,450 1,674,450
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,658 13,658 13,658 13,658 13,658 13,658 13,658
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,775 16,775 16,775 16,775 16,775 16,775 16,775
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,987 20,987 20,987 20,987 20,987 20,987 20,987
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,942 22,942 22,942 22,942 22,942 22,942 22,942
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,444 27,444 27,444 27,444 27,444 27,444 27,444
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,444 27,444 27,444 27,444 27,444 27,444 27,444
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 109,345 109,345 109,345 109,345 109,345 109,345 109,345
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 126,694 126,694 126,694 126,694 126,694 126,694 126,694
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 391,901 391,901 391,901 391,901 391,901 391,901 391,901
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 147,106 147,106 147,106 147,106 147,106 147,106 147,106
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 242,508 242,508 242,508 242,508 242,508 242,508 242,508
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,072,195 1,072,195 1,072,195 1,072,195 1,072,195 1,072,195 1,072,195
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,235,210 1,235,210 1,235,210 1,235,210 1,235,210 1,235,210 1,235,210
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,713 14,713 14,713 14,713 14,713 14,713 14,713
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,010 13,010 13,010 13,010 13,010 13,010 13,010
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,589 31,589 31,589 31,589 31,589 31,589 31,589
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 125,973 125,973 125,973 125,973 125,973 125,973 125,973
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 187,213 187,213 187,213 187,213 187,213 187,213 187,213
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,778 30,778 30,778 30,778 30,778 30,778 30,778
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 105,733 105,733 105,733 105,733 105,733 105,733 105,733
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 156,307 156,307 156,307 156,307 156,307 156,307 156,307
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 31,027 31,027 31,027 31,027 31,027 31,027 31,027
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 63,882 63,882 63,882 63,882 63,882 63,882 63,882
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 256,507 256,507 256,507 256,507 256,507 256,507 256,507
1.32 UNIÓN REPARACION PVC 4" UN ### 74,470 74,470 74,470 74,470 74,470 74,470 74,470
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 298,313 298,313 298,313 298,313 298,313 298,313 298,313
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 179,781 179,781 179,781 179,781 179,781 179,781 179,781
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 509,132 509,132 509,132 509,132 509,132 509,132 509,132
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,360,500 1,360,500 1,360,500 1,360,500 1,360,500 1,360,500 1,360,500
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,010,148 2,010,148 2,010,148 2,010,148 2,010,148 2,010,148 2,010,148

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,303 11,303 11,303 11,303 11,303 11,303 11,303
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,886 25,886 25,886 25,886 25,886 25,886 25,886
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 66,704 77,290 87,287 77,878 80,230 85,523 74,349
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 81,748 81,748 122,172 94,051 87,020 125,688 81,748
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 83,590 83,590 124,015 95,893 95,893 124,015 83,590
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 104,493 113,717 126,015 109,618 109,618 119,866 101,419
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 84,836 104,686 127,670 108,865 105,731 126,626 102,596
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 91,509 104,625 117,011 105,353 108,268 114,826 100,981

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 116,872 116,872 116,872 116,872 116,872 116,872 116,872
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,216,498 1,216,498 1,216,498 1,216,498 1,216,498 1,216,498 1,216,498
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ###
p 152,665 152,665 152,665 152,665 152,665 152,665 152,665
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ###i 1,408,967 1,408,967 1,408,967 1,408,967 1,408,967 1,408,967 1,408,967
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ###o 982,202 982,202 982,202 982,202 982,202 982,202 982,202
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,118 63,118 63,118 63,118 63,118 63,118 63,118
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 116,021 116,021 116,021 116,021 116,021 116,021 116,021
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 273,730 273,730 273,730 273,730 273,730 273,730 273,730
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 273,723 273,723 273,723 273,723 273,723 273,723 273,723
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 439,349 439,349 439,349 439,349 439,349 439,349 439,349
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 116,070 116,070 116,070 116,070 116,070 116,070 116,070
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 116,070 116,070 116,070 116,070 116,070 116,070 116,070
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 273,730 273,730 273,730 273,730 273,730 273,730 273,730
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 273,730 273,730 273,730 273,730 273,730 273,730 273,730
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 439,349 439,349 439,349 439,349 439,349 439,349 439,349
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 442,142 442,142 442,142 442,142 442,142 442,142 442,142
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 717,081 717,081 717,081 717,081 717,081 717,081 717,081
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,150,626 1,150,626 1,150,626 1,150,626 1,150,626 1,150,626 1,150,626
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 71,224 71,224 71,224 71,224 71,224 71,224 71,224
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 370,203 370,203 370,203 370,203 370,203 370,203 370,203
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 414,303 414,303 414,303 414,303 414,303 414,303 414,303
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,146,286 1,146,286 1,146,286 1,146,286 1,146,286 1,146,286 1,146,286
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 67,184 67,319 67,447 67,326 67,356 67,424 67,281
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 335,730 335,730 335,730 335,730 335,730 335,730 335,730
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 51,106 51,106 51,106 51,106 51,106 51,106 51,106
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 72,192 72,192 72,192 72,192 72,192 72,192 72,192
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 104,082 104,082 104,082 104,082 104,082 104,082 104,082
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 159,722 159,722 159,722 159,722 159,722 159,722 159,722
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 256,516 256,516 256,516 256,516 256,516 256,516 256,516
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 372,634 372,634 372,634 372,634 372,634 372,634 372,634
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 471,401 471,401 471,401 471,401 471,401 471,401 471,401
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 619,767 619,767 619,767 619,767 619,767 619,767 619,767
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 852,050 852,050 852,050 852,050 852,050 852,050 852,050

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 689,272 700,774 711,638 701,414 703,969 709,721 697,579
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y
4.2 CAÑUELA)
ML ### 682,656 692,509 701,816 693,057 695,247 700,174 689,772

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA
4.3 HF) UN ### 732,433 740,102 747,344 740,528 742,232 746,066 737,972
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 817,419 831,797 845,376 832,596 835,791 842,980 827,803
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y
4.5 CAÑUELA)
ML ### 966,334 980,209 993,315 980,981 984,064 991,002 976,355

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA
4.6 HF) UN ### 844,813 855,357 865,315 855,943 858,286 863,558 852,428
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,038,591 1,044,327 1,049,749 1,044,646 1,045,920 1,048,793 1,042,734
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,502,848 1,519,383 1,535,006 1,520,302 1,523,975 1,532,250 1,514,790
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,038,250 2,069,067 2,098,171 2,070,779 2,077,626 2,093,034 2,060,507
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,707,280 2,758,506 2,806,885 2,761,352 2,772,734 2,798,346 2,744,277
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,874,611 1,874,611 1,874,611 1,874,611 1,874,611 1,874,611 1,874,611
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,956,242 3,956,242 3,956,242 3,956,242 3,956,242 3,956,242 3,956,242
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE
4.13 INTERNO Y DEMOLICIÓN)
UN ### 144,435 144,837 145,217 144,859 144,948 145,150 144,725

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 75,101 75,807 76,474 75,846 76,003 76,356 75,611
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 88,829 89,535 90,202 89,574 89,731 90,084 89,339
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ###
p 57,938 60,053 62,051 60,171 60,641 61,698 59,466
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ###i 62,388 64,401 66,302 64,513 64,960 65,966 63,842
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ###o 62,680 64,653 66,516 64,763 65,201 66,188 64,105
5.6 BORDE SEPARADOR VERDE A-170 ML ### 258,827 259,229 259,609 259,251 259,341 259,542 259,117
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,327 19,581 19,821 19,595 19,652 19,779 19,511
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 41,519 43,010 44,418 43,093 43,424 44,170 42,596
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 85,892 86,107 86,310 86,119 86,166 86,274 86,047
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 577,074 581,903 586,463 582,171 583,244 585,659 580,561
5.11 LOSETA PREFABRICADA A-40 M2 ### 65,651 66,571 67,440 66,622 66,827 67,287 66,315
5.12 LOSETA PREFABRICADA A-60 M2 ### 93,991 94,912 95,781 94,963 95,167 95,627 94,656
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 34,542 35,347 36,108 35,392 35,571 35,974 35,124
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 55,371 57,000 58,539 57,091 57,453 58,268 56,548
5.15 SARDINEL PREFABRICADO A-10 ML ### 101,657 105,653 110,234 106,461 105,912 109,999 105,195
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 62,704 63,261 63,787 63,292 63,415 63,694 63,106

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 207,488 208,446 209,352 208,500 208,712 209,192 208,180
6.2 BANCA EN CONCRETO M-30 UN ### 678,547 679,889 681,156 679,963 680,261 680,932 679,516
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 219,660 219,863 220,054 219,874 219,919 220,021 219,807
6.4 BOLARDO M-60 CONCRETO UN ### 166,167 167,317 168,404 167,381 167,637 168,212 166,998
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 168,147 169,297 170,383 169,361 169,617 170,192 168,978
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 196,728 197,943 199,091 198,011 198,281 198,889 197,606
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 60,716 61,256 61,767 61,286 61,407 61,677 61,106
6.8 BORDILLO PREFABRICADO A-80 ML ### 69,247 69,852 70,424 69,886 70,021 70,323 69,684
6.9 CANECA M-120 UN ### 317,174 317,310 317,437 317,317 317,347 317,415 317,272
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 837,167 837,742 838,285 837,774 837,902 838,189 837,582
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,425,546 3,425,929 3,426,291 3,425,950 3,426,036 3,426,227 3,425,823
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,523,794 3,524,177 3,524,539 3,524,198 3,524,284 3,524,475 3,524,071
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 493,192 493,597 493,980 493,620 493,710 493,912 493,485
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 653,461 655,082 656,612 655,172 655,532 656,342 654,631
6.15 BANCA EN MADERA M-50 UN ### 543,163 543,163 543,163 543,163 543,163 543,163 543,163
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 253,655 254,230 254,773 254,262 254,390 254,677 254,070
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 583,886 584,224 584,543 584,243 584,318 584,487 584,130
6.18 POSTE HISTÓRICO M-131 UN ### 6,509,998 6,512,874 6,515,590 6,513,034 6,513,673 6,515,111 6,512,075

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,091 4,091 4,091 4,091 4,091 4,091 4,091
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,236 44,236 44,236 44,236 44,236 44,236 44,236
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 319,242 319,443 319,633 319,454 319,499 319,600 319,387
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 502,486 503,296 504,061 503,341 503,521 503,926 503,071
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 239,863 240,064 240,254 240,075 240,120 240,220 240,008
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 254,604 254,805 254,995 254,816 254,861 254,961 254,749
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 265,767 265,968 266,158 265,979 266,024 266,124 265,912
7.8 TACHAS REFLECTIVAS UN ### 13,787 13,787 13,787 13,787 13,787 13,787 13,787
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,717 14,717 14,717 14,717 14,717 14,717 14,717
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 119,591 119,591 119,591 119,591 119,591 119,591 119,591
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS p INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA
1.1 201 P DISTANCIA DE 5KM)
M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.2 201 P DISTANCIA DE 5KM) M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.3 200.1 DISTANCIA DE 5KM)
HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A


1.4 200.2 UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA


1.5 201.7 DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,


1.6 *** SOBREACARREOS Y DERRUMBES M3-KM### 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,916 35,916 35,916 35,916 35,916 35,916 35,916
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494 494 494 494 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA


2.9 600.1 MENOR DE 5 KM) M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA


2.10 600.2 MENOR DE 5 KM)
M3 ### 66,309 66,309 66,309 66,309 66,309 66,309 66,309

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA


2.11 600.3 DISTANCIA MENOR DE 5 KM) M3 ### 81,475 81,475 81,475 81,475 81,475 81,475 81,475

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA


2.12 600.4 DISTANCIA MENOR DE 5 KM)
M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES


2.13 600.4 P A UNA DISTANCIA MENOR DE 5 KM) M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A


2.14 600.5 UNA DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE


2.15 600.5 P SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 164,310 150,249 236,371 176,613 167,825 220,553 159,037
3.3 330.1 BASE GRANULAR M3 ### 171,023 204,418 243,085 211,448 206,175 241,327 200,902
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS
3.4 365.1 CON CARGUE MENOR A 5 Km) M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,266 3,266 3,266 3,266 3,266 3,266 3,266
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,142 1,142 1,142 1,142 1,142 1,142 1,142
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 224,078 227,140 230,032 227,310 227,991 229,522 226,290
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 69,276 70,638 71,925 70,714 71,017 71,698 70,260
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 637,531 669,641 706,821 676,401 671,331 705,131 666,261
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 646,742 678,852 716,032 685,612 680,542 714,342 675,472
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 685,236 717,346 754,526 724,106 719,036 752,836 713,966
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 702,012 734,122 771,302 740,882 735,812 769,612 730,742
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### 342,307 375,479 401,254 370,687 376,386 396,561 333,774
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ###
p 320,424 353,818 392,485 360,848 355,576 390,728 350,303
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ###i 312,648 298,587 384,709 324,951 316,163 368,891 307,375
o
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 39,119 39,119 39,119 39,119 39,119 39,119 39,119

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 173,122 173,122 173,122 173,122 173,122 173,122 173,122
3.15 311.1 AFIRMADO M3 ### 78,036 78,036 118,461 90,340 90,340 118,461 78,036
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,494 11,696 11,886 11,707 11,752 11,852 11,640
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,579 4,680 4,775 4,686 4,708 4,759 4,652
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3.18 500.1 TRANSFERENCIA Y UNIÓN M3 ### 654,036 672,782 690,486 673,824 677,988 687,362 667,574

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE


3.19 500.1 TRANSFERENCIA Y UNIÓN
M3 ### 686,604 706,190 724,687 707,278 711,629 721,422 700,749

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE


3.20 500.1 TRANSFERENCIA Y UNIÓN
M3 ### 708,450 728,624 747,677 729,745 734,228 744,315 723,020

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E


3.21 *** INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,326 7,326 7,326 7,326 7,326 7,326 7,326
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 123,206 151,463 184,181 157,412 152,950 182,694 148,488

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 941,620 962,884 982,967 964,066 968,790 979,423 956,978
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 809,090 830,002 849,750 831,163 835,809 846,266 824,192
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 857,602 879,342 899,873 880,549 885,379 896,250 873,302
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 582,949 601,926 619,848 602,980 607,197 616,685 596,655
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 683,592 703,320 721,953 704,417 708,800 718,664 697,841
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 580,135 599,498 617,785 600,574 604,876 614,558 594,120
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 680,667 700,796 719,808 701,916 706,388 716,453 695,205
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 745,706 765,069 783,356 766,145 770,447 780,129 759,690
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 600,020 620,149 639,160 621,268 625,740 635,806 614,558
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 791,708 811,837 830,849 812,957 817,429 827,494 806,246
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,280 12,280 12,280 12,280 12,280 12,280 12,280
4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG ### 15,681 15,681 15,681 15,681 15,681 15,681 15,681
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,842 1,842 1,842 1,842 1,842 1,842 1,842
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI
4.14 621.1 (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,737,251 2,737,251 2,737,251 2,737,251 2,737,251 2,737,251 2,737,251

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE


4.15 621.1 P EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS) ML ### 4,265,741 4,302,113 4,336,464 4,304,135 4,312,216 4,330,403 4,292,010
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,769,081 1,788,252 1,806,358 1,789,318 1,793,577 1,803,163 1,782,927
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3)### 88,898 88,898 88,898 88,898 88,898 88,898 88,898
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 369,725 372,025 374,198 372,153 372,664 373,814 371,386
4.19 632 P BARANDA METÁLICA ML ### 434,321 434,321 434,321 434,321 434,321 434,321 434,321
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,309 17,309 17,309 17,309 17,309 17,309 17,309
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 496,348 517,098 561,570 525,822 530,432 558,112 511,334
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 129,363 142,748 160,595 136,799 136,799 151,671 124,902
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 86,205 86,205 123,520 97,562 91,072 126,765 86,205
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 387,670 408,127 427,446 409,264 413,808 424,037 402,444
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 384,121 406,549 429,923 409,387 410,464 427,357 402,091
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 392,792 415,220 438,594 418,058 419,135 436,028 410,762
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 399,471 421,833 445,146 424,668 425,731 442,591 417,394
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 408,142 430,504 453,817 433,339 434,402 451,262 426,065
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 531,593 551,939 571,154 553,070 557,590 567,764 546,287
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 630,429 651,581 671,558 652,757 657,456 668,033 645,706
4.31 681.1 GAVIÓN M3 ### 212,817 239,789 271,020 245,468 241,209 269,601 236,950
4.32 681.1 GAVIÓN MALLA PVC M3 ### 217,024 243,997 275,228 249,675 245,416 273,808 241,158
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ###
p 43,781 45,030 46,210 45,100 45,377 46,002 44,683
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ###i 16,739 17,363 17,953 17,398 17,537 17,849 17,190
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 o
4.35 *** KN)
M2 ### 10,341 10,341 10,341 10,341 10,341 10,341 10,341

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,685 14,685 14,685 14,685 14,685 14,685 14,685
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,715 19,715 19,715 19,715 19,715 19,715 19,715
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA
4.38 *** 100 KN) M2 ### 23,606 23,606 23,606 23,606 23,606 23,606 23,606

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA


4.39 *** 165 KN)
M2 ### 30,292 30,292 30,292 30,292 30,292 30,292 30,292

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y


4.40 *** SEPARACIÓN)
M2 ### 7,421 7,421 7,421 7,421 7,421 7,421 7,421

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y


4.41 *** SEPARACIÓN)
M2 ### 8,442 8,442 8,442 8,442 8,442 8,442 8,442

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y


4.42 *** SEPARACIÓN)
M2 ### 8,771 8,771 8,771 8,771 8,771 8,771 8,771

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,277 6,277 6,277 6,277 6,277 6,277 6,277

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,404 9,404 9,404 9,404 9,404 9,404 9,404

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,688 7,688 7,688 7,688 7,688 7,688 7,688

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,404 9,404 9,404 9,404 9,404 9,404 9,404

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y


4.47 *** SEPARACIÓN) M2 ### 17,976 17,976 17,976 17,976 17,976 17,976 17,976

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE


4.48 661.1 EMBOQUILLADA ML ### 640,809 641,121 641,416 641,139 641,208 641,364 641,034
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 366,600 371,053 375,258 371,300 372,289 374,516 369,816
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 894,999 894,999 894,999 894,999 894,999 894,999 894,999
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 149,022 149,022 187,892 160,852 160,852 187,892 149,022
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,505 4,505 4,505 4,505 4,505 4,505 4,505
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 87,029 87,029 87,029 87,029 87,029 87,029 87,029
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 132,554 132,554 132,554 132,554 132,554 132,554 132,554
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 537,401 558,553 578,529 559,729 564,428 575,005 552,677
4.56 682.1 P COLCHONETA RENO M3 ### 229,480 256,452 287,683 262,131 257,872 286,264 253,613
4.57 *** TRINCHO EN MADERA M2 ### 68,951 68,951 68,951 68,951 68,951 68,951 68,951

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,091 4,091 4,091 4,091 4,091 4,091 4,091
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,236 44,236 44,236 44,236 44,236 44,236 44,236
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 84,918 84,918 84,918 84,918 84,918 84,918 84,918
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 70,693 70,693 70,693 70,693 70,693 70,693 70,693
5.5 730.1 DEFENSA METÁLICA ML ### 149,872 150,740 151,559 150,788 150,980 151,414 150,499
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,787 13,787 13,787 13,787 13,787 13,787 13,787

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 858 858 858 858 858 858 858
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE
6.2 801.6 RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE


6.3 801.7 SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6.6 801.4 DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: ALMEIDAS
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón
i
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ###
p 15,283 15,283 15,283 15,283 15,283 15,283 15,283
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ###i 24,690 24,690 24,690 24,690 24,690 24,690 24,690
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ###o 9,420 9,420 9,420 9,420 9,420 9,420 9,420

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,064,631 2,048,481 2,073,675 2,083,064 2,063,340 2,067,862 2,051,712 2,070,446
1.2 CAMPAMENTO 9 M2 UN ### 1,207,456 1,199,381 1,211,978 1,216,672 1,206,810 1,209,071 1,200,996 1,210,363
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,823 14,823 14,823 14,823 14,823 14,823 14,823 14,823
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,615 16,615 16,615 16,615 16,615 16,615 16,615 16,615
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,224 19,224 19,224 19,224 19,224 19,224 19,224 19,224
1.6 CERCA EN TABLA H=2.30 M ML ### 68,281 68,281 68,281 68,281 68,281 68,281 68,281 68,281
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 47,763 47,590 47,859 47,956 47,749 47,797 47,625 47,825
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,072 21,900 22,169 22,266 22,059 22,107 21,934 22,134
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 936,088 933,470 937,650 939,815 935,751 937,527 933,814 937,305
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 10,731 10,731 10,731 10,731 10,731 10,731 10,731 10,731
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,904 3,904 3,904 3,904 3,904 3,904 3,904 3,904
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,788,493 2,788,493 2,788,493 2,788,493 2,788,493 2,788,493 2,788,493 2,788,493
1.44 RED TELEFÓNICA PROVISIONAL UN ### 258,683 258,683 258,683 258,683 258,683 258,683 258,683 258,683
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 86,115 70,297 96,661 117,752 73,812 101,933 87,873 100,176
2.2 BASE ARENA CEMENTO 1:20 M3 ### 192,228 175,719 201,472 208,737 190,908 195,530 179,021 198,170
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ###
p 23,036 23,036 23,036 23,036 23,036 23,036 23,036 23,036
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### i 643,387 626,382 652,909 662,585 642,027 646,788 629,783 649,508
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### o 644,379 626,896 654,169 663,982 642,981 647,876 630,393 650,673
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 600,354 583,983 609,521 618,709 599,045 603,628 587,257 606,247
2.9 PILOTE DE MADERA D=20 CM ML ### 51,132 51,132 51,132 51,132 51,132 51,132 51,132 51,132
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM)
ML ### 157,911 157,911 157,911 157,911 157,911 157,911 157,911 157,911

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.11 DISTANCIA MENOR DE 5 KM) ML ### 197,148 197,148 197,148 197,148 197,148 197,148 197,148 197,148

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.12 DISTANCIA MENOR DE 5 KM) ML ### 244,598 244,598 244,598 244,598 244,598 244,598 244,598 244,598

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.13 DISTANCIA MENOR DE 5 KM)
ML ### 308,474 308,474 308,474 308,474 308,474 308,474 308,474 308,474
2.14 PILOTE HINCADO 25X25 ML ### 106,676 105,498 107,336 107,984 106,582 106,912 105,734 107,100
2.15 PILOTE HINCADO 30X30 ML ### 131,314 129,606 132,270 133,209 131,177 131,655 129,948 131,928
2.16 DADOS EN CONCRETO 3500PSI M3 ### 585,356 568,985 594,523 603,711 584,046 588,630 572,259 591,249
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2.17 5 KM)
ML ### 94,627 94,627 94,627 94,627 94,627 94,627 94,627 94,627

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 39,955 39,852 40,012 40,057 39,947 39,975 39,873 39,992
3.2 SIFÓN EN PVC 6" UN ### 205,491 205,388 205,548 205,594 205,483 205,512 205,409 205,528
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 474,215 459,796 483,083 496,067 472,005 484,697 461,193 481,685
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 234,376 231,508 236,049 237,871 234,057 235,590 231,956 235,601
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 266,371 261,675 269,105 272,052 265,855 268,317 262,417 268,363
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 348,186 340,894 352,375 356,464 347,463 350,652 342,155 351,113
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 110,284 110,194 110,343 110,463 110,264 110,393 110,194 110,343
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,331,706 1,330,811 1,332,303 1,333,497 1,331,507 1,332,801 1,330,811 1,332,303
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 119,649 118,516 120,283 120,782 119,558 119,875 118,742 120,057
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 75,371 74,773 75,706 75,969 75,323 75,491 74,893 75,586
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,864 28,544 29,043 29,196 28,838 28,928 28,608 28,979
3.12 TUBERÍA DRENAJE PVC 160 ML ### 46,503 46,182 46,682 46,835 46,477 46,567 46,246 46,618
3.13 TUBERÍA DRENAJE PVC 200 ML ### 60,945 60,496 61,196 61,410 60,909 61,034 60,586 61,106
3.14 TUBERÍA DRENAJE PVC 250 ML ### 83,382 82,869 83,669 83,913 83,341 83,484 82,972 83,566
3.15 TUBERÍA DRENAJE PVC 315 ML ### 115,420 114,972 115,672 115,886 115,385 115,510 115,062 115,582

3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 989,599 984,472 992,470 994,915 989,189 990,624 985,497 991,445

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3.17 FILTRANTE) UN ### 1,395,526 1,385,272 1,401,268 1,406,158 1,394,706 1,397,577 1,387,322 1,399,218

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL


3.18 FILTRANTE) UN ### 1,811,459 1,790,952 1,822,944 1,832,723 1,809,819 1,815,562 1,795,053 1,818,843

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 43,977 43,977 43,977 43,977 43,977 43,977 43,977 43,977
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 57,969 57,969 57,969 57,969 57,969 57,969 57,969 57,969
4.3 COLUMNAS 3500 PSI M3 ### 816,120 799,750 825,287 834,476 814,811 819,395 803,024 822,014
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 255,126 240,811 255,186 262,755 252,611 260,998 247,101 260,597
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI
M2 ### 99,907 98,318 100,797 101,689 99,780 100,225 98,636 100,479

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE


4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 117,692 115,785 118,760 119,831 117,540 118,074 116,166 118,379
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 131,259 128,716 132,683 134,110 131,055 131,767 129,224 132,174
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 138,450 135,748 139,963 141,480 138,234 138,991 136,289 139,423
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 158,140 154,802 160,009 161,882 157,873 158,808 155,470 159,342
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 175,688 171,873 177,824 179,965 175,382 176,450 172,636 177,061
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ###
p 194,897 190,605 197,300 199,708 194,554 195,755 191,464 196,442
4.12 ENTREPISO VIGUETA PLACA M2 ### i 103,370 103,086 103,529 103,675 103,347 103,427 103,143 103,472
4.13 ESCALERA MACIZA 3500 PSI M3 ### o 970,654 954,283 979,821 989,009 969,345 973,928 957,557 976,547
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 98,699 98,494 98,814 98,904 98,683 98,740 98,535 98,773
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 79,953 78,316 80,870 81,789 79,822 80,281 78,644 80,543
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 89,660 87,657 90,781 91,905 89,499 90,060 88,057 90,380
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 104,135 101,623 105,541 106,950 103,934 104,637 102,126 105,039
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 711,643 695,272 720,810 729,998 710,334 714,917 698,546 717,536
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 51,055 50,557 51,334 51,608 51,015 51,155 50,657 51,235
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 281,027 273,716 285,121 289,225 280,443 282,490 275,178 283,660
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,355 4,355 4,355 4,355 4,355 4,355 4,355 4,355
4.22 ACERO FIGURADO 60000 PSI KG ### 4,569 4,569 4,569 4,569 4,569 4,569 4,569 4,569
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,449 6,449 6,449 6,449 6,449 6,449 6,449 6,449
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 866,964 850,593 876,131 885,319 865,655 870,238 853,867 872,857
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 783,611 765,690 793,646 803,709 782,178 787,195 769,274 790,063
4.26 VIGA AÉREA 3500 PSI M3 ### 857,939 841,568 867,106 876,294 856,630 861,213 844,842 863,832
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 836,643 820,272 845,810 854,999 835,334 839,918 823,547 842,537
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,059,510 1,043,140 1,068,677 1,077,866 1,058,201 1,062,785 1,046,414 1,065,404
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 307,615 289,133 317,966 328,711 306,137 311,313 292,829 314,270

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,617 30,182 30,861 31,088 30,582 30,704 30,269 30,774
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 52,192 51,757 52,436 52,663 52,157 52,279 51,844 52,349
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,781 36,679 36,839 36,884 36,773 36,802 36,699 36,818
5.4 ARCOS EN LADRILLO PRENSADO ML ### 172,310 172,105 172,425 172,515 172,293 172,351 172,146 172,384
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,549 45,051 45,828 46,102 45,509 45,649 45,150 45,729
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,056 27,851 28,171 28,261 28,040 28,097 27,892 28,130
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 103,085 102,674 103,314 103,495 103,052 103,167 102,757 103,232
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 92,173 90,512 93,104 94,017 92,040 92,506 90,844 92,771
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,707 95,707 95,707 95,707 95,707 95,707 95,707 95,707
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 56,253 56,253 56,253 56,253 56,253 56,253 56,253 56,253
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 92,203 92,203 92,203 92,203 92,203 92,203 92,203 92,203
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,501 54,501 54,501 54,501 54,501 54,501 54,501 54,501
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 106,699 106,699 106,699 106,699 106,699 106,699 106,699 106,699
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 63,149 63,149 63,149 63,149 63,149 63,149 63,149 63,149
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 118,589 118,589 118,589 118,589 118,589 118,589 118,589 118,589
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 69,094 69,094 69,094 69,094 69,094 69,094 69,094 69,094
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,513 42,307 42,628 42,719 42,497 42,554 42,348 42,587
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,829 25,726 25,887 25,932 25,821 25,850 25,747 25,866
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 55,342 55,205 55,419 55,480 55,331 55,370 55,232 55,392
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,373 33,305 33,412 33,442 33,368 33,387 33,318 33,398
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 62,277 62,140 62,354 62,415 62,266 62,305 62,167 62,327
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,555 37,486 37,593 37,623 37,549 37,568 37,500 37,579
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 103,167 102,480 103,552 103,854 103,112 103,305 102,618 103,414
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 61,207 60,864 61,400 61,551 61,180 61,276 60,933 61,331
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 39,027 38,890 39,104 39,164 39,016 39,054 38,917 39,076
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,733 23,664 23,772 23,802 23,728 23,747 23,678 23,758
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 77,525 77,250 77,679 77,800 77,503 77,580 77,305 77,624
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,883 46,746 46,960 47,021 46,872 46,911 46,773 46,933
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 91,494 91,289 91,609 91,700 91,478 91,535 91,330 91,568
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 55,646 55,543 55,703 55,749 55,638 55,667 55,564 55,683
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 189,321 188,359 189,860 190,283 189,244 189,513 188,552 189,667
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 114,158 113,677 114,427 114,639 114,120 114,254 113,773 114,331
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 93,668 93,173 93,945 94,162 93,628 93,767 93,272 93,846
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ###
p 56,733 56,485 56,871 56,980 56,713 56,782 56,535 56,822
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### i 48,895 48,588 49,068 49,203 48,871 48,957 48,649 49,006
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### o 29,852 29,698 29,938 30,006 29,840 29,883 29,729 29,908
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 35,377 35,239 35,454 35,514 35,366 35,404 35,267 35,426
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,617 21,548 21,655 21,685 21,611 21,630 21,562 21,641
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 53,240 52,965 53,394 53,515 53,218 53,295 53,020 53,339
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,748 32,610 32,825 32,885 32,737 32,775 32,638 32,797
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 102,707 102,295 102,938 103,119 102,674 102,789 102,377 102,855
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,747 62,540 62,862 62,953 62,730 62,788 62,582 62,821
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 74,985 74,710 75,139 75,260 74,963 75,040 74,765 75,084
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,413 45,275 45,490 45,550 45,402 45,440 45,303 45,462
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 157,235 156,274 157,774 158,197 157,159 157,428 156,466 157,582
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 95,978 95,497 96,247 96,459 95,939 96,074 95,593 96,151
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 33,256 33,154 33,314 33,359 33,248 33,277 33,174 33,293
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,008 37,652 38,207 38,364 37,980 38,079 37,724 38,136
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,269 63,795 64,535 64,743 64,231 64,364 63,890 64,440
5.50 LAVADA DE FACHADA M2 ### 5,549 5,549 5,549 5,549 5,549 5,549 5,549 5,549
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 52,572 52,138 52,816 53,044 52,538 52,659 52,225 52,729
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,166 11,166 11,166 11,166 11,166 11,166 11,166 11,166
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,687 14,687 14,687 14,687 14,687 14,687 14,687 14,687
5.54 ANCLAJE 1/2" L=50CM UN ### 19,171 19,171 19,171 19,171 19,171 19,171 19,171 19,171
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,722 26,722 26,722 26,722 26,722 26,722 26,722 26,722
5.56 ANCLAJE 3/4" L=70CM UN ### 39,692 39,692 39,692 39,692 39,692 39,692 39,692 39,692
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 4,971 4,847 5,040 5,110 4,961 4,995 4,872 5,015

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,049 17,049 17,049 17,049 17,049 17,049 17,049 17,049
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,988 5,885 6,045 6,090 5,979 6,008 5,906 6,025
6.3 FILOS O DILATACIONES S/MURO ML ### 7,245 7,142 7,302 7,347 7,236 7,265 7,163 7,282
6.4 GOTERA EN MORTERO 1:4 ML ### 8,578 8,475 8,635 8,680 8,570 8,598 8,496 8,615
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,147 7,147 7,147 7,147 7,147 7,147 7,147 7,147
6.6 MALLA BAJO ENTRAMADO M2 ### 14,427 14,427 14,427 14,427 14,427 14,427 14,427 14,427
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,462 25,116 25,655 25,808 25,434 25,531 25,185 25,586
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,480 15,307 15,577 15,653 15,467 15,515 15,342 15,543
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,011 21,722 22,173 22,300 21,988 22,069 21,780 22,115
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,426 13,282 13,507 13,571 13,415 13,455 13,311 13,478
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,337 20,991 21,531 21,683 21,309 21,406 21,060 21,462
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,089 12,916 13,186 13,262 13,076 13,124 12,951 13,152
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,011 21,722 22,173 22,300 21,988 22,069 21,780 22,115
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,426 13,282 13,507 13,571 13,415 13,455 13,311 13,478
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,583 22,336 22,721 22,829 22,563 22,632 22,385 22,671
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,711 13,588 13,780 13,834 13,701 13,736 13,612 13,755
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,342 18,122 18,465 18,561 18,324 18,386 18,166 18,421
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,286 11,176 11,347 11,396 11,277 11,308 11,198 11,325
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,828 17,564 17,976 18,092 17,807 17,881 17,617 17,923
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,029 10,897 11,103 11,161 11,019 11,056 10,924 11,077
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,836 22,547 22,997 23,124 22,813 22,894 22,605 22,940
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,818 13,673 13,898 13,962 13,806 13,847 13,702 13,870
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 22,162 21,816 22,356 22,508 22,134 22,231 21,885 22,287
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,481 13,308 13,578 13,654 13,467 13,515 13,342 13,543
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,475 18,211 18,623 18,739 18,454 18,528 18,264 18,570
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,334 11,202 11,408 11,466 11,323 11,360 11,228 11,381
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 23,105 22,759 23,299 23,451 23,077 23,174 22,828 23,229
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,381 14,208 14,477 14,554 14,367 14,415 14,242 14,443
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
p
7 CUBIERTAS i
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### o 27,909 27,497 28,140 28,321 27,876 27,991 27,579 28,057
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE)
M2 ### 85,320 84,489 85,785 86,241 85,253 85,486 84,655 85,619
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 57,666 57,666 57,666 57,666 57,666 57,666 57,666 57,666
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,156 23,156 23,156 23,156 23,156 23,156 23,156 23,156
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,299 36,299 36,299 36,299 36,299 36,299 36,299 36,299
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 84,109 84,109 84,109 84,109 84,109 84,109 84,109 84,109
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 65,975 65,975 65,975 65,975 65,975 65,975 65,975 65,975
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,586 38,586 38,586 38,586 38,586 38,586 38,586 38,586
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 88,124 88,124 88,124 88,124 88,124 88,124 88,124 88,124
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 105,128 105,128 105,128 105,128 105,128 105,128 105,128 105,128
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 154,256 154,256 154,256 154,256 154,256 154,256 154,256 154,256
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 61,322 61,322 61,322 61,322 61,322 61,322 61,322 61,322
7.13 CANAL PVC AMAZONAS ML ### 85,419 85,419 85,419 85,419 85,419 85,419 85,419 85,419
7.14 CANAL PVC RAINGO ML ### 77,749 77,749 77,749 77,749 77,749 77,749 77,749 77,749
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 137,088 137,088 137,088 137,088 137,088 137,088 137,088 137,088
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 79,941 79,941 79,941 79,941 79,941 79,941 79,941 79,941
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 58,834 58,834 58,834 58,834 58,834 58,834 58,834 58,834
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,941 33,941 33,941 33,941 33,941 33,941 33,941 33,941
7.19000000000001 TEJA DE BARRO M2 ### 61,865 61,353 62,152 62,378 61,824 61,968 61,455 62,050
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 49,032 49,032 49,032 49,032 49,032 49,032 49,032 49,032
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 44,978 44,978 44,978 44,978 44,978 44,978 44,978 44,978
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,259 38,259 38,259 38,259 38,259 38,259 38,259 38,259
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 37,433 37,433 37,433 37,433 37,433 37,433 37,433 37,433
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,711 37,711 37,711 37,711 37,711 37,711 37,711 37,711
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 52,814 52,814 52,814 52,814 52,814 52,814 52,814 52,814
7.26 TEJA PLÁSTICA No.6 M2 ### 46,497 46,497 46,497 46,497 46,497 46,497 46,497 46,497
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 84,730 84,730 84,730 84,730 84,730 84,730 84,730 84,730
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 155,996 155,996 155,996 155,996 155,996 155,996 155,996 155,996
7.29000000000001 TEJA SIN TRASLAPO M2 ### 70,301 70,301 70,301 70,301 70,301 70,301 70,301 70,301
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,829 44,829 44,829 44,829 44,829 44,829 44,829 44,829
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 35,004 35,004 35,004 35,004 35,004 35,004 35,004 35,004
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM)
M2 ### 60,526 60,526 60,526 60,526 60,526 60,526 60,526 60,526
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,112 21,112 21,112 21,112 21,112 21,112 21,112 21,112
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,293 25,293 25,293 25,293 25,293 25,293 25,293 25,293
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,327 27,327 27,327 27,327 27,327 27,327 27,327 27,327
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,044 35,044 35,044 35,044 35,044 35,044 35,044 35,044
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,264 23,264 23,264 23,264 23,264 23,264 23,264 23,264
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,702 54,702 54,702 54,702 54,702 54,702 54,702 54,702
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 368,626 368,626 368,626 368,626 368,626 368,626 368,626 368,626
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 428,976 428,976 428,976 428,976 428,976 428,976 428,976 428,976
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 281,982 281,982 281,982 281,982 281,982 281,982 281,982 281,982
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 300,745 300,745 300,745 300,745 300,745 300,745 300,745 300,745

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 441,679 424,606 451,239 460,629 440,313 445,094 428,020 447,825
8.2 CONCRETO 3500 PSI M3 ### 385,695 369,801 394,595 403,516 384,424 388,874 372,980 391,417
8.3 CONCRETO 3000 PSI M3 ### 383,658 367,149 392,903 402,297 382,338 386,960 370,451 389,601
8.4 CONCRETO 2500 PSI M3 ### 335,774 319,162 345,076 354,211 334,445 339,096 322,484 341,754
8.5 CONCRETO 2000 PSI M3 ### 312,260 295,033 321,907 331,617 310,882 315,706 298,478 318,462
8.6 CONCRETO 1500 PSI M3 ### 282,638 264,694 292,687 303,119 281,203 286,228 268,283 289,099
8.7 MORTERO SECO 1:10 M3 ### 238,726 224,576 246,650 252,877 237,595 241,556 227,406 243,820
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ###
p 458,930 445,189 466,624 472,670 457,831 461,678 447,938 463,876
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### i 426,838 410,359 436,067 443,318 425,519 430,134 413,654 432,771
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### o 490,351 474,938 498,982 505,764 489,118 493,434 478,021 495,900
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 723,991 708,578 732,622 739,404 722,758 727,074 711,661 729,540

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 128,596 128,596 128,596 128,596 128,596 128,596 128,596 128,596
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,086 3,983 4,143 4,189 4,078 4,107 4,004 4,123
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 144,282 144,282 144,282 144,282 144,282 144,282 144,282 144,282
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 176,265 176,265 176,265 176,265 176,265 176,265 176,265 176,265
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 254,590 254,590 254,590 254,590 254,590 254,590 254,590 254,590
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 283,265 283,265 283,265 283,265 283,265 283,265 283,265 283,265
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 311,975 311,975 311,975 311,975 311,975 311,975 311,975 311,975
9.8 HOJA PUERTA FORTEC 0.81 UN ### 206,951 206,951 206,951 206,951 206,951 206,951 206,951 206,951
9.9 HOJA PUERTA FORTEC 0.91 UN ### 234,542 234,542 234,542 234,542 234,542 234,542 234,542 234,542
9.10 HOJA PUERTA FORTEC 1.50 UN ### 344,906 344,906 344,906 344,906 344,906 344,906 344,906 344,906
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 131,076 131,076 131,076 131,076 131,076 131,076 131,076 131,076
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 173,841 173,841 173,841 173,841 173,841 173,841 173,841 173,841
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 193,155 193,155 193,155 193,155 193,155 193,155 193,155 193,155
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 491,137 491,137 491,137 491,137 491,137 491,137 491,137 491,137
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,069 44,069 44,069 44,069 44,069 44,069 44,069 44,069
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,223 104,223 104,223 104,223 104,223 104,223 104,223 104,223
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 125,785 125,785 125,785 125,785 125,785 125,785 125,785 125,785
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 97,780 97,780 97,780 97,780 97,780 97,780 97,780 97,780
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,513 30,513 30,513 30,513 30,513 30,513 30,513 30,513
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,513 30,513 30,513 30,513 30,513 30,513 30,513 30,513
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,941 28,941 28,941 28,941 28,941 28,941 28,941 28,941
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,343 44,343 44,343 44,343 44,343 44,343 44,343 44,343
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 54,792 54,792 54,792 54,792 54,792 54,792 54,792 54,792
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 65,939 65,939 65,939 65,939 65,939 65,939 65,939 65,939
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 79,175 79,175 79,175 79,175 79,175 79,175 79,175 79,175
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 371,433 371,433 371,433 371,433 371,433 371,433 371,433 371,433
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 259,965 259,965 259,965 259,965 259,965 259,965 259,965 259,965
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,286 35,286 35,286 35,286 35,286 35,286 35,286 35,286
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,039 45,039 45,039 45,039 45,039 45,039 45,039 45,039
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 54,792 54,792 54,792 54,792 54,792 54,792 54,792 54,792
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 68,726 68,726 68,726 68,726 68,726 68,726 68,726 68,726

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 79,539 79,539 79,539 79,539 79,539 79,539 79,539 79,539
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 219,653 219,653 219,653 219,653 219,653 219,653 219,653 219,653
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 84,460 84,460 84,460 84,460 84,460 84,460 84,460 84,460
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 152,014 152,014 152,014 152,014 152,014 152,014 152,014 152,014
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 142,934 142,934 142,934 142,934 142,934 142,934 142,934 142,934
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 93,864 93,864 93,864 93,864 93,864 93,864 93,864 93,864
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 220,751 220,751 220,751 220,751 220,751 220,751 220,751 220,751
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,259 115,259 115,259 115,259 115,259 115,259 115,259 115,259
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,931 6,931 6,931 6,931 6,931 6,931 6,931 6,931
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2")
M2 ### 105,002 105,002 105,002 105,002 105,002 105,002 105,002 105,002

10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 126,246 126,246 126,246 126,246 126,246 126,246 126,246 126,246
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 43,206 43,206 43,206 43,206 43,206 43,206 43,206 43,206
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ###
p 559,421 559,421 559,421 559,421 559,421 559,421 559,421 559,421
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### i 201,726 201,726 201,726 201,726 201,726 201,726 201,726 201,726
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### o 227,367 227,367 227,367 227,367 227,367 227,367 227,367 227,367
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS)
M2 ### 510,684 510,684 510,684 510,684 510,684 510,684 510,684 510,684
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 135,186 135,186 135,186 135,186 135,186 135,186 135,186 135,186
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 407,676 407,676 407,676 407,676 407,676 407,676 407,676 407,676
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,325 6,325 6,325 6,325 6,325 6,325 6,325 6,325
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 287,361 287,361 287,361 287,361 287,361 287,361 287,361 287,361
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 128,496 128,496 128,496 128,496 128,496 128,496 128,496 128,496
10.21 REJILLA PISO 0.30 M M2 ### 90,085 90,085 90,085 90,085 90,085 90,085 90,085 90,085
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,138 93,138 93,138 93,138 93,138 93,138 93,138 93,138
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN,
KG ### 11,078 11,078 11,078 11,078 11,078 11,078 11,078 11,078
SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE,
10.24 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 12,274 12,274 12,274 12,274 12,274 12,274 12,274 12,274
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS,
10.25 VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 9,790 9,790 9,790 9,790 9,790 9,790 9,790 9,790
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 232,624 232,624 232,624 232,624 232,624 232,624 232,624 232,624
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 279,699 279,699 279,699 279,699 279,699 279,699 279,699 279,699
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,156 23,156 23,156 23,156 23,156 23,156 23,156 23,156
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 36,299 36,299 36,299 36,299 36,299 36,299 36,299 36,299
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,925 34,925 34,925 34,925 34,925 34,925 34,925 34,925
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,679 44,679 44,679 44,679 44,679 44,679 44,679 44,679
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 91,849 91,849 91,849 91,849 91,849 91,849 91,849 91,849
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 234,029 234,029 234,029 234,029 234,029 234,029 234,029 234,029
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,915 46,915 46,915 46,915 46,915 46,915 46,915 46,915
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 36,920 36,920 36,920 36,920 36,920 36,920 36,920 36,920
11.13 NIPLE PASAMURO 2" UN ### 70,564 70,564 70,564 70,564 70,564 70,564 70,564 70,564
11.14 NIPLE PASAMURO 4" UN ### 105,338 105,338 105,338 105,338 105,338 105,338 105,338 105,338
11.15 PUNTO AGUA CALIENTE CPVC UN ### 88,563 88,563 88,563 88,563 88,563 88,563 88,563 88,563
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 65,056 65,056 65,056 65,056 65,056 65,056 65,056 65,056
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 69,094 69,094 69,094 69,094 69,094 69,094 69,094 69,094
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 87,287 87,287 87,287 87,287 87,287 87,287 87,287 87,287
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 70,059 70,059 70,059 70,059 70,059 70,059 70,059 70,059
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 87,294 87,294 87,294 87,294 87,294 87,294 87,294 87,294
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 93,268 93,268 93,268 93,268 93,268 93,268 93,268 93,268
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 76,897 76,897 76,897 76,897 76,897 76,897 76,897 76,897
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,072 13,072 13,072 13,072 13,072 13,072 13,072 13,072
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,332 18,332 18,332 18,332 18,332 18,332 18,332 18,332
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,949 23,949 23,949 23,949 23,949 23,949 23,949 23,949
11.26 RED SUMINISTRO PVC 1" ML ### 14,837 14,837 14,837 14,837 14,837 14,837 14,837 14,837
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,894 8,894 8,894 8,894 8,894 8,894 8,894 8,894
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 53,170 53,170 53,170 53,170 53,170 53,170 53,170 53,170
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
11.29 RED SUMINISTRO PVC 2" ML ###
p 34,071 34,071 34,071 34,071 34,071 34,071 34,071 34,071
11.30 RED SUMINISTRO PVC 3/4" ML ### i 11,117 11,117 11,117 11,117 11,117 11,117 11,117 11,117
11.31 RED SANITARIA PVC-S 2" ML ### o 26,384 26,384 26,384 26,384 26,384 26,384 26,384 26,384
11.32 RED SANITARIA PVC-S 3" ML ### 36,551 36,551 36,551 36,551 36,551 36,551 36,551 36,551
11.33 RED SANITARIA PVC-S 4" ML ### 49,564 49,564 49,564 49,564 49,564 49,564 49,564 49,564
11.34 RED SANITARIA PVC-S 6" ML ### 92,269 92,269 92,269 92,269 92,269 92,269 92,269 92,269
11.35 REGISTRO 1" UN ### 112,399 112,399 112,399 112,399 112,399 112,399 112,399 112,399
11.36 REGISTRO 1/2" UN ### 62,719 62,719 62,719 62,719 62,719 62,719 62,719 62,719
11.37 REGISTRO 3/4" UN ### 79,715 79,715 79,715 79,715 79,715 79,715 79,715 79,715
11.38 REGISTRO 1 1/2" UN ### 192,137 192,137 192,137 192,137 192,137 192,137 192,137 192,137
11.39 REGISTRO 2 1/2" UN ### 395,542 395,542 395,542 395,542 395,542 395,542 395,542 395,542
11.40 REGISTRO 2" UN ### 292,512 292,512 292,512 292,512 292,512 292,512 292,512 292,512
11.41 REVENTILACIÓN 2" ML ### 18,435 18,435 18,435 18,435 18,435 18,435 18,435 18,435
11.42 REVENTILACIÓN 3" ML ### 23,250 23,250 23,250 23,250 23,250 23,250 23,250 23,250
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 180,772 180,772 180,772 180,772 180,772 180,772 180,772 180,772
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 293,637 293,637 293,637 293,637 293,637 293,637 293,637 293,637
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 488,187 488,187 488,187 488,187 488,187 488,187 488,187 488,187

11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 42,074 42,074 42,074 42,074 42,074 42,074 42,074 42,074

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.47 SOPORTES)
ML ### 49,612 49,612 49,612 49,612 49,612 49,612 49,612 49,612

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 63,833 63,833 63,833 63,833 63,833 63,833 63,833 63,833

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.49 SOPORTES)
ML ### 72,295 72,295 72,295 72,295 72,295 72,295 72,295 72,295

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.50 SOPORTES)
ML ### 93,156 93,156 93,156 93,156 93,156 93,156 93,156 93,156

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y


11.51 SOPORTES)
ML ### 108,173 108,173 108,173 108,173 108,173 108,173 108,173 108,173

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y


11.52 SOPORTES)
ML ### 160,004 160,004 160,004 160,004 160,004 160,004 160,004 160,004
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,775 64,775 64,775 64,775 64,775 64,775 64,775 64,775
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 65,036 65,036 65,036 65,036 65,036 65,036 65,036 65,036
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,695 41,695 41,695 41,695 41,695 41,695 41,695 41,695
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 51,296 51,296 51,296 51,296 51,296 51,296 51,296 51,296
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,327 4,327 4,327 4,327 4,327 4,327 4,327 4,327
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,812 6,812 6,812 6,812 6,812 6,812 6,812 6,812
11.59 GABINETE TIPO III UN ### 1,054,490 1,054,490 1,054,490 1,054,490 1,054,490 1,054,490 1,054,490 1,054,490
11.60 GABINETE TIPO I UN ### 806,447 806,447 806,447 806,447 806,447 806,447 806,447 806,447
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,703,984 2,703,984 2,703,984 2,703,984 2,703,984 2,703,984 2,703,984 2,703,984
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,255,266 2,255,266 2,255,266 2,255,266 2,255,266 2,255,266 2,255,266 2,255,266
11.63 VÁLVULA MARIPOSA 3" UN ### 658,051 658,051 658,051 658,051 658,051 658,051 658,051 658,051
11.64 VÁLVULA MARIPOSA 4" UN ### 850,084 850,084 850,084 850,084 850,084 850,084 850,084 850,084
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 325,793 325,793 325,793 325,793 325,793 325,793 325,793 325,793

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 378,821 378,821 378,821 378,821 378,821 378,821 378,821 378,821
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 60,179 60,179 60,179 60,179 60,179 60,179 60,179 60,179
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 71,162 71,162 71,162 71,162 71,162 71,162 71,162 71,162
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 79,104 79,104 79,104 79,104 79,104 79,104 79,104 79,104
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 93,068 93,068 93,068 93,068 93,068 93,068 93,068 93,068
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 56,631 56,631 56,631 56,631 56,631 56,631 56,631 56,631
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 64,514 64,514 64,514 64,514 64,514 64,514 64,514 64,514
12.8 STRIP TELEFÓNICO 10 PARES UN ### 149,426 149,426 149,426 149,426 149,426 149,426 149,426 149,426
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ###
p 58,110 58,110 58,110 58,110 58,110 58,110 58,110 58,110
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### i 133,437 133,437 133,437 133,437 133,437 133,437 133,437 133,437
12.11 SALIDA T.V PVC COMPLETA. UN ### o 79,889 79,889 79,889 79,889 79,889 79,889 79,889 79,889
12.12 SALIDA BIFÁSICA C.N. UN ### 47,359 47,359 47,359 47,359 47,359 47,359 47,359 47,359
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 100,055 100,055 100,055 100,055 100,055 100,055 100,055 100,055
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 427,451 427,451 427,451 427,451 427,451 427,451 427,451 427,451
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 568,863 568,863 568,863 568,863 568,863 568,863 568,863 568,863
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,682 3,682 3,682 3,682 3,682 3,682 3,682 3,682
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,864 4,864 4,864 4,864 4,864 4,864 4,864 4,864
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,560 7,560 7,560 7,560 7,560 7,560 7,560 7,560
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,529 13,529 13,529 13,529 13,529 13,529 13,529 13,529
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 284,025 284,025 284,025 284,025 284,025 284,025 284,025 284,025
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 80,422 80,422 80,422 80,422 80,422 80,422 80,422 80,422
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 108,589 108,589 108,589 108,589 108,589 108,589 108,589 108,589
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,785 44,785 44,785 44,785 44,785 44,785 44,785 44,785
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,458,665 1,458,665 1,458,665 1,458,665 1,458,665 1,458,665 1,458,665 1,458,665
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,080,902 1,080,902 1,080,902 1,080,902 1,080,902 1,080,902 1,080,902 1,080,902
12.26 POSTE METÁLICO 6M UN ### 1,343,468 1,343,468 1,343,468 1,343,468 1,343,468 1,343,468 1,343,468 1,343,468
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 624,418 624,418 624,418 624,418 624,418 624,418 624,418 624,418
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 114,606 114,606 114,606 114,606 114,606 114,606 114,606 114,606
12.29 LUMINARIA 70W SODIO UN ### 523,708 523,708 523,708 523,708 523,708 523,708 523,708 523,708
12.30 LUMINARIA 150W SODIO UN ### 654,939 654,939 654,939 654,939 654,939 654,939 654,939 654,939
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,728,186 1,728,186 1,728,186 1,728,186 1,728,186 1,728,186 1,728,186 1,728,186
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,272,934 1,272,934 1,272,934 1,272,934 1,272,934 1,272,934 1,272,934 1,272,934

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,515 40,922 41,847 42,108 41,467 41,633 41,041 41,728
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,012 40,419 41,344 41,604 40,964 41,130 40,537 41,225
13.3 ALISTADO PARA LISTÓN M2 ### 15,516 15,397 15,582 15,634 15,506 15,540 15,421 15,559
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 28,955 27,769 29,619 30,140 28,860 29,192 28,006 29,382
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 88,205 87,019 88,869 89,390 88,110 88,442 87,256 88,631
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,682 27,337 27,875 28,069 27,654 27,750 27,406 27,806
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 57,634 55,973 58,565 59,478 57,502 57,967 56,305 58,232
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 79,048 76,390 80,536 81,998 78,835 79,579 76,921 80,005
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,824 31,824 31,824 31,824 31,824 31,824 31,824 31,824
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,265 24,265 24,265 24,265 24,265 24,265 24,265 24,265
13.11 PERMA PLY 2 CAPAS M2 ### 28,544 28,544 28,544 28,544 28,544 28,544 28,544 28,544
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 46,588 45,093 47,426 48,248 46,469 46,887 45,392 47,127
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 54,408 52,581 55,431 56,436 54,262 54,773 52,946 55,066
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 78,416 75,592 79,998 81,551 78,191 78,981 76,157 79,433
13.15 TRITURADO FINO 1/2 M3 ### 92,076 78,214 99,840 105,938 90,967 94,848 80,986 97,067
13.16 TRITURADO GRUESO 3/4 M3 ### 98,845 83,984 107,549 117,704 97,147 105,479 86,239 105,294

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 60,073 59,836 60,206 60,310 60,054 60,121 59,883 60,158
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 36,048 35,929 36,114 36,166 36,038 36,071 35,953 36,090
14.3 ADOQUÍN CONCRETO 6CM M2 ### 68,568 67,975 68,900 69,161 68,520 68,686 68,094 68,781
14.4 ADOQUÍN CONCRETO 8CM M2 ### 72,018 71,425 72,350 72,611 71,970 72,136 71,544 72,231
14.5 ADOQUÍN GRES PEATONAL M2 ### 76,490 75,897 76,822 77,083 76,443 76,609 76,016 76,704
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO
M2 ### 78,952 78,714 79,084 79,189 78,933 78,999 78,762 79,037
14.7 GRAVILLA PARA GRADAS ML ### 39,649 39,399 39,789 39,899 39,629 39,699 39,449 39,739
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 171,426 170,359 172,024 172,493 171,341 171,640 170,573 171,810
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 49,136 48,518 49,482 49,754 49,087 49,260 48,642 49,359
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
14.10 GUARDAESCOBA EN GRANITO ML ###
p 46,580 46,580 46,580 46,580 46,580 46,580 46,580 46,580
14.11 GUARDAESCOBA EN GRAVILLA ML ### i 10,729 10,479 10,869 10,978 10,709 10,779 10,529 10,819
14.12 GUARDAESCOBA PVC CARAMELO ML ### o 9,813 9,813 9,813 9,813 9,813 9,813 9,813 9,813
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,155 13,155 13,155 13,155 13,155 13,155 13,155 13,155
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,125 11,125 11,125 11,125 11,125 11,125 11,125 11,125
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,512 18,512 18,512 18,512 18,512 18,512 18,512 18,512
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,894 35,894 35,894 35,894 35,894 35,894 35,894 35,894
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,861 9,861 9,861 9,861 9,861 9,861 9,861 9,861
14.18 LISTÓN M.H. AMARILLO M2 ### 78,434 78,434 78,434 78,434 78,434 78,434 78,434 78,434
14.19 PASO ESCALERA GRANITO ML ### 124,920 124,090 125,385 125,750 124,854 125,086 124,256 125,219
14.20 PIRLANES ALUMINIO ML ### 8,097 8,097 8,097 8,097 8,097 8,097 8,097 8,097
14.21 PIRLANES LADRILLO ML ### 33,856 33,651 33,970 34,061 33,839 33,897 33,692 33,929
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,150 48,150 48,150 48,150 48,150 48,150 48,150 48,150
14.23 PISO VINILO TRÁFICO PESADO M2 ### 55,872 55,872 55,872 55,872 55,872 55,872 55,872 55,872
14.24 PULIDA LACADA PISO MADERA M2 ### 52,002 52,002 52,002 52,002 52,002 52,002 52,002 52,002
14.25 TABLETA DE GRES 25X25 M2 ### 52,154 51,917 52,287 52,391 52,135 52,201 51,964 52,239
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,463 58,225 58,595 58,700 58,444 58,510 58,273 58,548
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,658 11,658 11,658 11,658 11,658 11,658 11,658 11,658
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 52,013 51,706 52,186 52,321 51,989 52,075 51,767 52,124
14.29 JABONERA PORCELANA ACUARIO UN ### 21,658 21,658 21,658 21,658 21,658 21,658 21,658 21,658
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y
14.30 PERCHA SIMPLE)
UN ### 129,276 129,276 129,276 129,276 129,276 129,276 129,276 129,276
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,605 10,605 10,605 10,605 10,605 10,605 10,605 10,605
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,686 23,686 23,686 23,686 23,686 23,686 23,686 23,686
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,295 15,295 15,295 15,295 15,295 15,295 15,295 15,295
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,868 14,868 14,868 14,868 14,868 14,868 14,868 14,868
14.35 REMATES BOCEL ALUMINIO ML ### 9,138 9,138 9,138 9,138 9,138 9,138 9,138 9,138
14.36 REMATES BOCEL PORCELANA ML ### 9,293 9,293 9,293 9,293 9,293 9,293 9,293 9,293
14.37 TAPA REGISTRO 20X20 UN ### 20,110 20,110 20,110 20,110 20,110 20,110 20,110 20,110
14.38 TAPA REGISTRO 6X6 UN ### 18,350 18,350 18,350 18,350 18,350 18,350 18,350 18,350
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 19,452 19,452 19,452 19,452 19,452 19,452 19,452 19,452
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN
14.40 SITIO
M2 ### 22,487 22,487 22,487 22,487 22,487 22,487 22,487 22,487
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 68,420 68,182 68,552 68,657 68,401 68,467 68,230 68,505
14.42 MEDIA CAÑA EN GRANITO ML ### 80,955 80,955 80,955 80,955 80,955 80,955 80,955 80,955
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,619 36,619 36,619 36,619 36,619 36,619 36,619 36,619
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,014 14,014 14,014 14,014 14,014 14,014 14,014 14,014
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 106,049 106,049 106,049 106,049 106,049 106,049 106,049 106,049
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 128,610 128,610 128,610 128,610 128,610 128,610 128,610 128,610

15 CIELO RASO
15.1 APLIQUE YESO ML ### 76,100 76,100 76,100 76,100 76,100 76,100 76,100 76,100
15.2 ARMADURA MADERA Y MALLA M2 ### 38,316 38,316 38,316 38,316 38,316 38,316 38,316 38,316
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,525 58,525 58,525 58,525 58,525 58,525 58,525 58,525
15.4 CIELO RASO DURACUSTIC M2 ### 71,618 71,618 71,618 71,618 71,618 71,618 71,618 71,618
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,531 53,531 53,531 53,531 53,531 53,531 53,531 53,531
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 98,899 98,899 98,899 98,899 98,899 98,899 98,899 98,899
15.7 CORNISAS YESO ML ### 51,027 51,027 51,027 51,027 51,027 51,027 51,027 51,027
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 109,127 109,127 109,127 109,127 109,127 109,127 109,127 109,127
15.9 MALLA CON VENA M2 ### 14,328 14,328 14,328 14,328 14,328 14,328 14,328 14,328

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ###
p 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460
M3 ### i
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941
o
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 103,691 87,873 114,237 135,328 100,176 123,025 87,873 114,237
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 96,092 81,661 104,174 110,523 94,938 98,978 84,547 101,287
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 124,439 108,621 159,591 166,621 147,288 140,257 126,197 138,500
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 75,270 59,452 85,816 106,907 62,967 91,088 77,028 89,331
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 110,450 94,631 145,602 152,632 133,298 126,268 112,207 124,510
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 120,873 105,055 156,025 163,055 143,722 136,691 122,631 134,934

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 315,927 315,927 315,927 315,927 315,927 315,927 315,927 315,927
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 928,204 928,204 928,204 928,204 928,204 928,204 928,204 928,204
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 503,604 503,604 503,604 503,604 503,604 503,604 503,604 503,604
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 147,381 147,381 147,381 147,381 147,381 147,381 147,381 147,381
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 205,425 205,425 205,425 205,425 205,425 205,425 205,425 205,425
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 190,899 190,899 190,899 190,899 190,899 190,899 190,899 190,899
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 418,210 418,210 418,210 418,210 418,210 418,210 418,210 418,210
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,067,181 1,067,181 1,067,181 1,067,181 1,067,181 1,067,181 1,067,181 1,067,181
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 304,259 304,259 304,259 304,259 304,259 304,259 304,259 304,259
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 216,221 216,221 216,221 216,221 216,221 216,221 216,221 216,221
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 86,980 86,980 86,980 86,980 86,980 86,980 86,980 86,980
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE
17.12 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 261,217 261,217 261,217 261,217 261,217 261,217 261,217 261,217

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO


17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 383,997 383,997 383,997 383,997 383,997 383,997 383,997 383,997

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,823 8,823 8,823 8,823 8,823 8,823 8,823 8,823
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,258 3,258 3,258 3,258 3,258 3,258 3,258 3,258
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,817 11,817 11,817 11,817 11,817 11,817 11,817 11,817
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,543 44,543 44,543 44,543 44,543 44,543 44,543 44,543
18.5 CARBURO SOBRE PAÑETES M2 ### 6,189 6,189 6,189 6,189 6,189 6,189 6,189 6,189
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 68,518 68,518 68,518 68,518 68,518 68,518 68,518 68,518
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,691 3,691 3,691 3,691 3,691 3,691 3,691 3,691
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,929 2,929 2,929 2,929 2,929 2,929 2,929 2,929
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,749 14,749 14,749 14,749 14,749 14,749 14,749 14,749
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,263 4,263 4,263 4,263 4,263 4,263 4,263 4,263
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,547 15,547 15,547 15,547 15,547 15,547 15,547 15,547
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,029 6,029 6,029 6,029 6,029 6,029 6,029 6,029
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,873 6,873 6,873 6,873 6,873 6,873 6,873 6,873
18.14 ESTUCO M2 ### 7,461 7,461 7,461 7,461 7,461 7,461 7,461 7,461
18.15 ESTUCO (LINEAL) ML ### 4,679 4,679 4,679 4,679 4,679 4,679 4,679 4,679
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,432 16,432 16,432 16,432 16,432 16,432 16,432 16,432
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,208 10,208 10,208 10,208 10,208 10,208 10,208 10,208
18.18 LACA PISOS MADERA M2 ### 24,188 24,188 24,188 24,188 24,188 24,188 24,188 24,188
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,848 2,848 2,848 2,848 2,848 2,848 2,848 2,848
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,792 12,792 12,792 12,792 12,792 12,792 12,792 12,792
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,455 3,455 3,455 3,455 3,455 3,455 3,455 3,455
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
18.22 TINTILLA SOBRE MADERA LLENA M2 ###
p 13,317 13,317 13,317 13,317 13,317 13,317 13,317 13,317
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### i 7,497 7,497 7,497 7,497 7,497 7,497 7,497 7,497
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### o 4,724 4,724 4,724 4,724 4,724 4,724 4,724 4,724
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,943 22,943 22,943 22,943 22,943 22,943 22,943 22,943
18.26 PINTURA EPÓXICA M2 ### 13,448 13,448 13,448 13,448 13,448 13,448 13,448 13,448
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,324 8,324 8,324 8,324 8,324 8,324 8,324 8,324

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,311,162 6,311,162 6,311,162 6,311,162 6,311,162 6,311,162 6,311,162 6,311,162
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR)
UN ### 11,150,884 11,150,884 11,150,884 11,150,884 11,150,884 11,150,884 11,150,884 11,150,884
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,918,385 2,918,385 2,918,385 2,918,385 2,918,385 2,918,385 2,918,385 2,918,385
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,537,036 9,537,036 9,537,036 9,537,036 9,537,036 9,537,036 9,537,036 9,537,036
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,930,216 8,930,216 8,930,216 8,930,216 8,930,216 8,930,216 8,930,216 8,930,216
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,848 2,848 2,848 2,848 2,848 2,848 2,848 2,848
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 896,613 896,613 896,613 896,613 896,613 896,613 896,613 896,613
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 89,455 89,455 89,455 89,455 89,455 89,455 89,455 89,455
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,620,766 1,620,595 1,620,861 1,620,955 1,620,752 1,620,800 1,620,629 1,620,827
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 697,730 693,602 700,041 702,389 697,400 698,555 694,428 699,215

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,565 30,565 30,565 30,565 30,565 30,565 30,565 30,565
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 45,414 45,414 45,414 45,414 45,414 45,414 45,414 45,414
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 56,309 56,309 56,309 56,309 56,309 56,309 56,309 56,309
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,386 18,386 18,386 18,386 18,386 18,386 18,386 18,386
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,279 22,279 22,279 22,279 22,279 22,279 22,279 22,279
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,366 30,366 30,366 30,366 30,366 30,366 30,366 30,366
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,119 27,119 27,119 27,119 27,119 27,119 27,119 27,119
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,605 28,605 28,605 28,605 28,605 28,605 28,605 28,605
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,773 35,773 35,773 35,773 35,773 35,773 35,773 35,773
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,446 18,446 18,446 18,446 18,446 18,446 18,446 18,446
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,155 24,155 24,155 24,155 24,155 24,155 24,155 24,155
20.12 VÁLVULA DE BOLA GAS 1" UN ### 37,105 37,105 37,105 37,105 37,105 37,105 37,105 37,105
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 283,676 283,676 283,676 283,676 283,676 283,676 283,676 283,676
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 326,458 326,458 326,458 326,458 326,458 326,458 326,458 326,458
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 340,532 340,532 340,532 340,532 340,532 340,532 340,532 340,532
20.16 ACOMETIDA GAS 1/2" ML ### 316,356 316,356 316,356 316,356 316,356 316,356 316,356 316,356

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 231,083 231,083 231,083 231,083 231,083 231,083 231,083 231,083
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 35,347 35,347 35,347 35,347 35,347 35,347 35,347 35,347
21.3 SIRENA DE 110 V UN ### 108,114 108,114 108,114 108,114 108,114 108,114 108,114 108,114
21.4 CÁMARA CCTV UN ### 276,399 276,399 276,399 276,399 276,399 276,399 276,399 276,399
21.5 PARLANTE-CIELO FALSO UN ### 54,574 54,574 54,574 54,574 54,574 54,574 54,574 54,574
21.6 AMPLIFICADOR 100W UN ### 598,441 598,441 598,441 598,441 598,441 598,441 598,441 598,441
21.7 AMPLIFICADOR 300W UN ### 1,479,782 1,479,782 1,479,782 1,479,782 1,479,782 1,479,782 1,479,782 1,479,782
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,716 47,716 47,716 47,716 47,716 47,716 47,716 47,716
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 230,898 230,898 230,898 230,898 230,898 230,898 230,898 230,898
21.10 TOMA PARA MICRÓFONO UN ### 46,301 46,301 46,301 46,301 46,301 46,301 46,301 46,301
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,936 3,936 3,936 3,936 3,936 3,936 3,936 3,936
21.12 SPLITERS UN ### 6,582 6,582 6,582 6,582 6,582 6,582 6,582 6,582
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,739 19,739 19,739 19,739 19,739 19,739 19,739 19,739
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,808 25,808 25,808 25,808 25,808 25,808 25,808 25,808
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,495 33,495 33,495 33,495 33,495 33,495 33,495 33,495
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ###
p 128,105 128,105 128,105 128,105 128,105 128,105 128,105 128,105
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### i 33,435 33,435 33,435 33,435 33,435 33,435 33,435 33,435
21.18 BANDEJA PORTACABLES PARA RACK UN ### o 109,118 109,118 109,118 109,118 109,118 109,118 109,118 109,118
21.19 RACK 2' X 24" UN ### 193,544 193,544 193,544 193,544 193,544 193,544 193,544 193,544
21.20 RACK 3' X 24" UN ### 302,528 302,528 302,528 302,528 302,528 302,528 302,528 302,528
21.21 RACK 5' X 24" UN ### 376,539 376,539 376,539 376,539 376,539 376,539 376,539 376,539
21.22 RACK 7' X 24" UN ### 411,027 411,027 411,027 411,027 411,027 411,027 411,027 411,027
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 604,223 604,223 604,223 604,223 604,223 604,223 604,223 604,223
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 356,601 356,601 356,601 356,601 356,601 356,601 356,601 356,601
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 108,604 108,604 108,604 108,604 108,604 108,604 108,604 108,604
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,430 14,430 14,430 14,430 14,430 14,430 14,430 14,430
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,467 29,467 29,467 29,467 29,467 29,467 29,467 29,467
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,251 5,251 5,251 5,251 5,251 5,251 5,251 5,251
21.29 CANALETA METÁLICA 4X6 CMS ML ### 37,092 37,092 37,092 37,092 37,092 37,092 37,092 37,092
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,736 38,736 38,736 38,736 38,736 38,736 38,736 38,736
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,558 39,558 39,558 39,558 39,558 39,558 39,558 39,558
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,817 25,817 25,817 25,817 25,817 25,817 25,817 25,817
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,521 28,521 28,521 28,521 28,521 28,521 28,521 28,521
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,657 29,657 29,657 29,657 29,657 29,657 29,657 29,657
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 49,627 49,627 49,627 49,627 49,627 49,627 49,627 49,627
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 640,517 640,517 640,517 640,517 640,517 640,517 640,517 640,517
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 329,673 329,673 329,673 329,673 329,673 329,673 329,673 329,673
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 93,323 93,323 93,323 93,323 93,323 93,323 93,323 93,323
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,931 1,931 1,931 1,931 1,931 1,931 1,931 1,931
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,904 8,904 8,904 8,904 8,904 8,904 8,904 8,904
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,235 13,235 13,235 13,235 13,235 13,235 13,235 13,235
21.42 CABLE TELEFÓNICO 40 PARES ML ### 22,055 22,055 22,055 22,055 22,055 22,055 22,055 22,055
21.43 CABLE TELEVISIÓN RG6 ML ### 4,103 4,103 4,103 4,103 4,103 4,103 4,103 4,103
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,715 23,715 23,715 23,715 23,715 23,715 23,715 23,715
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,389 34,389 34,389 34,389 34,389 34,389 34,389 34,389
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,427 20,427 20,427 20,427 20,427 20,427 20,427 20,427
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 16,136 16,136 16,136 16,136 16,136 16,136 16,136 16,136
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 644,778 644,778 644,778 644,778 644,778 644,778 644,778 644,778
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
URBANISMOp
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 28,306 28,306 28,306 28,306 28,306 28,306 28,306 28,306
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 94,437 94,437 94,437 94,437 94,437 94,437 94,437 94,437
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 530,872 530,872 530,872 530,872 530,872 530,872 530,872 530,872
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,133,016 1,133,016 1,133,016 1,133,016 1,133,016 1,133,016 1,133,016 1,133,016
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 130,034 130,034 130,034 130,034 130,034 130,034 130,034 130,034
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 790,978 790,978 790,978 790,978 790,978 790,978 790,978 790,978
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,701,625 1,701,625 1,701,625 1,701,625 1,701,625 1,701,625 1,701,625 1,701,625
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,788 13,788 13,788 13,788 13,788 13,788 13,788 13,788
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,956 16,956 16,956 16,956 16,956 16,956 16,956 16,956
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,237 21,237 21,237 21,237 21,237 21,237 21,237 21,237
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 23,224 23,224 23,224 23,224 23,224 23,224 23,224 23,224
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,800 27,800 27,800 27,800 27,800 27,800 27,800 27,800
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,800 27,800 27,800 27,800 27,800 27,800 27,800 27,800
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 111,065 111,065 111,065 111,065 111,065 111,065 111,065 111,065
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 128,675 128,675 128,675 128,675 128,675 128,675 128,675 128,675
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 398,083 398,083 398,083 398,083 398,083 398,083 398,083 398,083
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 149,444 149,444 149,444 149,444 149,444 149,444 149,444 149,444
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 246,360 246,360 246,360 246,360 246,360 246,360 246,360 246,360
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,089,512 1,089,512 1,089,512 1,089,512 1,089,512 1,089,512 1,089,512 1,089,512
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,255,195 1,255,195 1,255,195 1,255,195 1,255,195 1,255,195 1,255,195 1,255,195
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,884 14,884 14,884 14,884 14,884 14,884 14,884 14,884
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,153 13,153 13,153 13,153 13,153 13,153 13,153 13,153
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 32,096 32,096 32,096 32,096 32,096 32,096 32,096 32,096
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 127,802 127,802 127,802 127,802 127,802 127,802 127,802 127,802
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 190,044 190,044 190,044 190,044 190,044 190,044 190,044 190,044
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 31,189 31,189 31,189 31,189 31,189 31,189 31,189 31,189
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 107,230 107,230 107,230 107,230 107,230 107,230 107,230 107,230
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 158,632 158,632 158,632 158,632 158,632 158,632 158,632 158,632
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 31,465 31,465 31,465 31,465 31,465 31,465 31,465 31,465
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 64,811 64,811 64,811 64,811 64,811 64,811 64,811 64,811
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 260,471 260,471 260,471 260,471 260,471 260,471 260,471 260,471
1.32 UNIÓN REPARACION PVC 4" UN ### 75,572 75,572 75,572 75,572 75,572 75,572 75,572 75,572
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 302,963 302,963 302,963 302,963 302,963 302,963 302,963 302,963
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 182,303 182,303 182,303 182,303 182,303 182,303 182,303 182,303
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 517,050 517,050 517,050 517,050 517,050 517,050 517,050 517,050
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,382,639 1,382,639 1,382,639 1,382,639 1,382,639 1,382,639 1,382,639 1,382,639
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,042,902 2,042,902 2,042,902 2,042,902 2,042,902 2,042,902 2,042,902 2,042,902

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,367 11,367 11,367 11,367 11,367 11,367 11,367 11,367
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 26,014 26,014 26,014 26,014 26,014 26,014 26,014 26,014
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 78,551 64,419 86,465 92,682 77,420 81,377 67,246 83,639
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 98,399 82,581 108,945 130,036 94,884 117,733 82,581 108,945
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 80,823 65,005 91,369 112,460 68,520 96,642 82,581 94,884
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 102,287 92,038 92,038 97,163 99,212 109,461 94,088 109,461
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 95,172 85,769 80,545 87,859 90,993 104,575 96,217 99,351
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 85,297 71,966 92,761 98,627 84,231 87,963 74,633 90,095

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 118,716 118,716 118,716 118,716 118,716 118,716 118,716 118,716
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,236,317 1,236,317 1,236,317 1,236,317 1,236,317 1,236,317 1,236,317 1,236,317
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ###
p 155,094 155,094 155,094 155,094 155,094 155,094 155,094 155,094
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### i 1,431,937 1,431,937 1,431,937 1,431,937 1,431,937 1,431,937 1,431,937 1,431,937
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### o 998,162 998,162 998,162 998,162 998,162 998,162 998,162 998,162
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,332 63,332 63,332 63,332 63,332 63,332 63,332 63,332
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 117,849 117,849 117,849 117,849 117,849 117,849 117,849 117,849
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 278,117 278,117 278,117 278,117 278,117 278,117 278,117 278,117
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 278,110 278,110 278,110 278,110 278,110 278,110 278,110 278,110
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 446,424 446,424 446,424 446,424 446,424 446,424 446,424 446,424
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 117,899 117,899 117,899 117,899 117,899 117,899 117,899 117,899
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 117,899 117,899 117,899 117,899 117,899 117,899 117,899 117,899
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 278,117 278,117 278,117 278,117 278,117 278,117 278,117 278,117
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 278,117 278,117 278,117 278,117 278,117 278,117 278,117 278,117
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 446,424 446,424 446,424 446,424 446,424 446,424 446,424 446,424
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 448,690 448,690 448,690 448,690 448,690 448,690 448,690 448,690
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 728,130 728,130 728,130 728,130 728,130 728,130 728,130 728,130
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,168,508 1,168,508 1,168,508 1,168,508 1,168,508 1,168,508 1,168,508 1,168,508
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 72,317 72,317 72,317 72,317 72,317 72,317 72,317 72,317
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 375,574 375,574 375,574 375,574 375,574 375,574 375,574 375,574
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 420,850 420,850 420,850 420,850 420,850 420,850 420,850 420,850
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,164,157 1,164,157 1,164,157 1,164,157 1,164,157 1,164,157 1,164,157 1,164,157
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 68,115 67,978 68,192 68,253 68,104 68,143 68,005 68,165
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 340,536 340,536 340,536 340,536 340,536 340,536 340,536 340,536
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 51,874 51,874 51,874 51,874 51,874 51,874 51,874 51,874
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 73,304 73,304 73,304 73,304 73,304 73,304 73,304 73,304
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 105,716 105,716 105,716 105,716 105,716 105,716 105,716 105,716
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 162,244 162,244 162,244 162,244 162,244 162,244 162,244 162,244
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 260,621 260,621 260,621 260,621 260,621 260,621 260,621 260,621
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 378,287 378,287 378,287 378,287 378,287 378,287 378,287 378,287
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 478,648 478,648 478,648 478,648 478,648 478,648 478,648 478,648
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 629,330 629,330 629,330 629,330 629,330 629,330 629,330 629,330
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 865,415 865,415 865,415 865,415 865,415 865,415 865,415 865,415

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 681,395 671,490 686,942 692,579 680,603 683,376 673,471 684,961

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO


4.2 E=1.5CM Y CAÑUELA) ML ### 672,623 665,071 676,852 680,176 672,019 674,134 666,582 675,342

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE
4.3 ARO Y TAPA HF)
UN ### 730,960 724,356 734,658 738,415 730,432 732,280 725,677 733,337

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 807,479 795,097 814,413 821,458 806,489 809,955 797,574 811,936

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO


4.5 E=1.5CM Y CAÑUELA)
ML ### 953,267 942,632 959,223 963,902 952,417 955,395 944,760 957,096

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE
4.6 ARO Y TAPA HF)
UN ### 841,052 831,972 846,137 851,303 840,326 842,868 833,788 844,321
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,037,350 1,032,440 1,040,099 1,042,558 1,036,957 1,038,332 1,033,422 1,039,117
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,490,810 1,476,702 1,498,710 1,506,153 1,489,681 1,493,632 1,479,524 1,495,889
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,015,158 1,989,078 2,029,762 2,044,406 2,013,072 2,020,375 1,994,294 2,024,547
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,660,124 2,616,772 2,684,400 2,708,742 2,656,658 2,668,796 2,625,443 2,675,732
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,901,245 1,901,245 1,901,245 1,901,245 1,901,245 1,901,245 1,901,245 1,901,245
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,015,508 4,015,508 4,015,508 4,015,508 4,015,508 4,015,508 4,015,508 4,015,508
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE
4.13 PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 144,838 144,530 145,011 145,146 144,813 144,900 144,591 144,949

5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ###
p 75,598 74,880 76,000 76,316 75,541 75,742 75,024 75,857
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### i 89,534 88,816 89,936 90,252 89,477 89,678 88,960 89,793
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### o 55,301 53,557 56,278 57,237 55,161 55,650 53,905 55,929
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 60,329 58,595 61,299 62,286 60,190 60,675 58,942 60,953
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 60,542 58,874 61,477 62,414 60,409 60,876 59,207 61,143
5.6 BORDE SEPARADOR VERDE A-170 ML ### 262,094 261,785 262,266 262,402 262,069 262,155 261,847 262,204
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,029 18,820 19,146 19,261 19,012 19,071 18,862 19,104
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 39,646 38,416 40,334 41,010 39,547 39,891 38,662 40,088
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 86,565 86,400 86,657 86,730 86,552 86,598 86,433 86,624
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 577,067 572,793 579,461 581,342 576,725 577,922 573,648 578,606
5.11 LOSETA PREFABRICADA A-40 M2 ### 64,702 63,997 65,097 65,408 64,646 64,843 64,138 64,956
5.12 LOSETA PREFABRICADA A-60 M2 ### 93,600 92,894 93,995 94,305 93,543 93,741 93,035 93,854
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 33,755 33,062 34,143 34,538 33,700 33,894 33,200 34,005
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 53,717 52,314 54,503 55,301 53,605 53,998 52,594 54,222
5.15 SARDINEL PREFABRICADO A-10 ML ### 97,869 95,913 101,941 102,810 100,443 99,693 97,936 99,520
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 62,406 61,979 62,645 62,833 62,372 62,491 62,064 62,559

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 209,006 208,180 209,468 209,938 208,940 209,171 208,346 209,303
6.2 BANCA EN CONCRETO M-30 UN ### 686,929 685,773 687,576 688,233 686,836 687,160 686,004 687,345
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 222,317 222,144 222,413 222,510 222,303 222,351 222,179 222,379
6.4 BOLARDO M-60 CONCRETO UN ### 166,633 165,642 167,187 167,751 166,553 166,831 165,840 166,989
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 168,612 167,622 169,167 169,731 168,533 168,811 167,820 168,969
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 197,555 196,521 198,134 198,716 197,472 197,762 196,728 197,927
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 60,924 60,375 61,232 61,474 60,880 61,034 60,484 61,122
6.8 BORDILLO PREFABRICADO A-80 ML ### 69,840 69,225 70,185 70,456 69,791 69,963 69,348 70,062
6.9 CANECA M-120 UN ### 321,923 321,785 322,000 322,060 321,912 321,950 321,813 321,972
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 848,933 848,438 849,211 849,492 848,894 849,032 848,537 849,112
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,479,667 3,479,337 3,479,852 3,480,040 3,479,641 3,479,734 3,479,403 3,479,786
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,579,524 3,579,194 3,579,709 3,579,897 3,579,498 3,579,591 3,579,260 3,579,643
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 500,324 499,979 500,516 500,711 500,296 500,392 500,048 500,448
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 661,367 659,989 662,139 662,916 661,257 661,643 660,264 661,863
6.15 BANCA EN MADERA M-50 UN ### 551,486 551,486 551,486 551,486 551,486 551,486 551,486 551,486
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 256,143 255,648 256,420 256,702 256,104 256,242 255,747 256,321
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 592,857 592,513 593,049 593,200 592,829 592,926 592,582 592,981
6.18 POSTE HISTÓRICO M-131 UN ### 6,610,067 6,607,591 6,611,454 6,612,863 6,609,869 6,610,562 6,608,086 6,610,958

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,156 4,156 4,156 4,156 4,156 4,156 4,156 4,156
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,793 44,793 44,793 44,793 44,793 44,793 44,793 44,793
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 323,616 323,462 323,702 323,770 323,604 323,647 323,493 323,671
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 508,500 507,811 508,886 509,274 508,445 508,638 507,949 508,748
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 242,424 242,269 242,510 242,578 242,411 242,454 242,300 242,479
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 257,406 257,251 257,492 257,560 257,393 257,436 257,282 257,461
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 268,751 268,596 268,837 268,905 268,738 268,781 268,627 268,806
7.8 TACHAS REFLECTIVAS UN ### 13,976 13,976 13,976 13,976 13,976 13,976 13,976 13,976
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,922 14,922 14,922 14,922 14,922 14,922 14,922 14,922
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN) UN ### 121,419 121,419 121,419 121,419 121,419 121,419 121,419 121,419
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICASp INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A


1.2 201 P UNA DISTANCIA DE 5KM)
M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A


1.3 200.1 UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE


1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.5 201.7 DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,


1.6 *** SOBREACARREOS Y DERRUMBES
M3-KM### 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,112 36,112 36,112 36,112 36,112 36,112 36,112 36,112
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494 494 494 494 494 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA


2.9 600.1 DISTANCIA MENOR DE 5 KM)
M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA


2.10 600.2 DISTANCIA MENOR DE 5 KM) M3 ### 66,555 66,555 66,555 66,555 66,555 66,555 66,555 66,555

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A


2.11 600.3 UNA DISTANCIA MENOR DE 5 KM)
M3 ### 81,721 81,721 81,721 81,721 81,721 81,721 81,721 81,721

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE


2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE


2.13 600.4 P SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE


2.14 600.5 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE


2.15 600.5 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 110,450 94,631 145,602 152,632 133,298 126,268 112,207 124,510
3.3 330.1 BASE GRANULAR M3 ### 120,873 105,055 156,025 163,055 143,722 136,691 122,631 134,934
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3.4 365.1 ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,311 3,311 3,311 3,311 3,311 3,311 3,311 3,311
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,201 1,201 1,201 1,201 1,201 1,201 1,201 1,201
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 227,745 224,022 229,831 231,469 227,448 228,490 224,767 229,086
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 67,768 66,707 68,363 68,851 67,683 67,980 66,919 68,150
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 591,103 565,753 668,843 628,283 645,183 582,653 591,103 608,003
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 598,779 573,429 676,519 635,959 652,859 590,329 598,779 615,679

3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 638,079 612,729 715,819 675,259 692,159 629,629 638,079 654,979
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### p 629,484 604,134 707,224 666,664 683,564 621,034 629,484 646,384
i
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### o 340,165 336,465 301,191 317,603 314,934 356,103 358,793 329,590
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 272,830 257,011 307,982 315,012 295,678 288,648 274,587 286,890
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 261,253 245,435 296,405 303,436 284,102 277,072 263,011 275,314
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 39,623 39,623 39,623 39,623 39,623 39,623 39,623 39,623
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 175,716 175,716 175,716 175,716 175,716 175,716 175,716 175,716
3.15 311.1 AFIRMADO M3 ### 75,270 59,452 85,816 106,907 62,967 91,088 77,028 89,331
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,941 11,672 12,092 12,210 11,919 11,995 11,726 12,038
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,788 4,653 4,863 4,922 4,777 4,815 4,680 4,836
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3.18 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 632,439 616,981 641,095 649,596 631,203 635,531 620,073 638,004

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y


3.19 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 664,239 648,089 673,283 682,165 662,948 667,470 651,319 670,053

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y


3.20 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 685,280 668,695 694,568 703,667 683,954 688,598 672,012 691,251

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA,


3.21 *** SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,374 7,374 7,374 7,374 7,374 7,374 7,374 7,374
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 129,715 116,330 108,894 119,304 123,766 143,099 131,202 135,663

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 916,407 898,873 926,226 935,869 915,005 919,915 902,380 922,720
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 784,044 766,800 793,699 803,183 782,664 787,493 770,248 790,251
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 831,466 813,540 841,504 851,364 830,032 835,052 817,124 837,919
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 561,929 545,876 570,918 579,928 560,645 565,140 549,087 567,708
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 661,736 645,047 671,081 680,448 660,401 665,074 648,385 667,744
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 559,871 543,197 569,209 578,697 558,538 563,206 546,532 565,874
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 659,597 642,262 669,304 679,168 658,211 663,064 645,729 665,837
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 725,442 708,768 734,780 744,268 724,109 728,777 712,103 731,445
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 578,856 561,521 588,563 598,427 577,470 582,323 564,988 585,096
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 770,544 753,210 780,251 790,115 769,158 774,011 756,677 776,784
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-
4.11 650 P 36
KG ### 12,361 12,361 12,361 12,361 12,361 12,361 12,361 12,361
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-
4.12 650 P 588 GRADO B
KG ### 15,813 15,813 15,813 15,813 15,813 15,813 15,813 15,813
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,857 1,857 1,857 1,857 1,857 1,857 1,857 1,857
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO
4.14 621.1 TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,766,337 2,766,337 2,766,337 2,766,337 2,766,337 2,766,337 2,766,337 2,766,337

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL


4.15 621.1 P (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
ML ### 4,233,384 4,203,391 4,250,180 4,266,674 4,230,985 4,239,383 4,209,390 4,244,181

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,751,661 1,735,152 1,760,906 1,770,300 1,750,341 1,754,963 1,738,454 1,757,604
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 90,083 90,083 90,083 90,083 90,083 90,083 90,083 90,083
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 369,781 367,800 370,890 372,018 369,622 370,177 368,196 370,494
4.19 632 P BARANDA METÁLICA ML ### 438,422 438,422 438,422 438,422 438,422 438,422 438,422 438,422
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,524 17,524 17,524 17,524 17,524 17,524 17,524 17,524
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 468,220 441,376 484,291 506,679 459,280 481,376 455,613 483,033
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 128,185 113,313 113,313 120,749 123,724 138,596 116,288 138,596
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 101,597 86,995 111,331 130,800 98,352 119,443 86,995 111,331
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 363,844 346,445 373,588 383,395 362,452 367,325 349,924 370,108
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 372,334 357,130 370,551 380,162 369,344 379,269 364,605 378,218
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 381,005 365,801 379,222 388,833 378,015 387,940 373,276 386,889
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 386,442 371,608 384,452 393,719 383,482 393,303 379,009 392,193
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 395,113 380,279 393,123 402,390 392,153 401,974 387,680 400,864
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 505,677 488,899 515,072 524,299 504,335 509,032 492,254 511,717
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ###
p 603,487 586,045 613,254 622,846 602,092 606,975 589,533 609,766
4.31 681.1 GAVIÓN M3 ### i 219,919 207,142 200,044 209,981 214,240 232,695 221,338 225,597
4.32 681.1 GAVIÓN MALLA PVC M3 ### o 224,195 211,419 204,321 214,258 218,517 236,972 225,615 229,874
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 42,216 41,186 42,792 43,359 42,133 42,422 41,392 42,586

4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 15,969 15,454 16,257 16,540 15,927 16,071 15,557 16,154
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA
4.35 *** ÚLTIMA 25 KN)
M2 ### 10,471 10,471 10,471 10,471 10,471 10,471 10,471 10,471

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,885 14,885 14,885 14,885 14,885 14,885 14,885 14,885

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,998 19,998 19,998 19,998 19,998 19,998 19,998 19,998

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.38 *** (RESISTENCIA ÚLTIMA 100 KN)
M2 ### 23,952 23,952 23,952 23,952 23,952 23,952 23,952 23,952

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.39 *** (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 30,749 30,749 30,749 30,749 30,749 30,749 30,749 30,749
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y
4.40 *** SEPARACIÓN)
M2 ### 7,515 7,515 7,515 7,515 7,515 7,515 7,515 7,515
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y
4.41 *** SEPARACIÓN) M2 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y


4.42 *** SEPARACIÓN)
M2 ### 8,886 8,886 8,886 8,886 8,886 8,886 8,886 8,886

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y


4.43 *** SEPARACIÓN)
M2 ### 6,352 6,352 6,352 6,352 6,352 6,352 6,352 6,352

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y


4.44 *** SEPARACIÓN)
M2 ### 9,530 9,530 9,530 9,530 9,530 9,530 9,530 9,530

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y


4.45 *** SEPARACIÓN) M2 ### 7,784 7,784 7,784 7,784 7,784 7,784 7,784 7,784

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y


4.46 *** SEPARACIÓN) M2 ### 9,530 9,530 9,530 9,530 9,530 9,530 9,530 9,530

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y


4.47 *** SEPARACIÓN)
M2 ### 18,242 18,242 18,242 18,242 18,242 18,242 18,242 18,242

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE


4.48 661.1 I, INCLUYE EMBOQUILLADA
ML ### 649,280 649,072 649,396 649,487 649,263 649,321 649,114 649,354

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 365,754 362,001 367,856 369,934 365,454 366,505 362,751 367,106

4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 908,364 908,364 908,364 908,364 908,364 908,364 908,364 908,364
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 146,392 131,182 156,532 176,812 134,562 161,602 148,082 159,912
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,569 4,569 4,569 4,569 4,569 4,569 4,569 4,569
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 88,360 88,360 88,360 88,360 88,360 88,360 88,360 88,360

4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 134,599 134,599 134,599 134,599 134,599 134,599 134,599 134,599
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 511,010 493,567 520,777 530,369 509,615 514,498 497,055 517,289
4.56 682.1 P COLCHONETA RENO M3 ### 236,651 223,874 216,776 226,713 230,972 249,427 238,070 242,329
4.57 *** TRINCHO EN MADERA M2 ### 69,979 69,979 69,979 69,979 69,979 69,979 69,979 69,979

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,156 4,156 4,156 4,156 4,156 4,156 4,156 4,156
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,793 44,793 44,793 44,793 44,793 44,793 44,793 44,793
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 86,211 86,211 86,211 86,211 86,211 86,211 86,211 86,211
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 71,753 71,753 71,753 71,753 71,753 71,753 71,753 71,753
5.5 730.1 DEFENSA METÁLICA ML ### 151,249 150,403 151,722 152,095 151,181 151,418 150,572 151,553
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,976 13,976 13,976 13,976 13,976 13,976 13,976 13,976
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ALTO MAGDALENA
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Agua_de_Dios Girardot Guataquí Jerusalén Nariño Nilo Ricaurte Tocaima
i
6 NORMA INV MANTENIMIENTO VIAL
p
6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### i 862 862 862 862 862 862 862 862
o
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE
6.2 801.6 RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES


6.3 801.7 Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A
6.6 801.4 UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,475 15,475 15,475 15,475 15,475 15,475 15,475 15,475
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 25,036 25,036 25,036 25,036 25,036 25,036 25,036 25,036
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,504 9,504 9,504 9,504 9,504 9,504 9,504 9,504

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
CONSTRUCCIÓN p
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,283,769 2,203,542 2,290,455
1.2 CAMPAMENTO 9 M2 UN ### 1,320,887 1,280,773 1,324,230
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 15,254 15,254 15,254
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 17,103 17,103 17,103
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,766 19,766 19,766
1.6 CERCA EN TABLA H=2.30 M ML ### 71,716 71,716 71,716
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 51,378 50,554 51,447
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 24,293 23,469 24,361
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 1,002,332 992,602 1,001,327
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 11,229 11,229 11,229
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 4,098 4,098 4,098
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,940,869 2,940,869 2,940,869
1.44 RED TELEFÓNICA PROVISIONAL UN ### 271,232 271,232 271,232
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 182,689 135,234 144,022
2.2 BASE ARENA CEMENTO 1:20 M3 ### 268,528 211,051 273,318
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ###
p 217,047 217,047 217,047
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### i 24,190 24,190 24,190
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### o 798,813 716,541 805,669
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 799,128 715,967 806,058
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 744,108 666,239 750,597
2.9 PILOTE DE MADERA D=20 CM ML ### 51,707 51,707 51,707

2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 159,780 159,780 159,780

2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 201,315 201,315 201,315

2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 251,544 251,544 251,544

2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 319,159 319,159 319,159

2.14 PILOTE HINCADO 25X25 ML ### 118,002 112,539 118,457


2.15 PILOTE HINCADO 30X30 ML ### 147,728 139,810 148,387
2.16 DADOS EN CONCRETO 3500PSI M3 ### 729,110 651,241 735,599
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 95,857 95,857 95,857

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 42,027 41,670 42,057
3.2 SIFÓN EN PVC 6" UN ### 217,452 217,095 217,481
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 555,547 517,188 543,672
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 256,576 246,814 256,118
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 297,684 282,000 296,994
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 395,990 370,518 396,115
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 112,581 112,432 112,412
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,412,033 1,410,541 1,410,342
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 129,071 125,126 129,400
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 81,372 79,290 81,545
3.11 TUBERÍA DRENAJE PVC 110 ML ### 33,095 31,312 33,243
3.12 TUBERÍA DRENAJE PVC 160 ML ### 51,763 49,981 51,912
3.13 TUBERÍA DRENAJE PVC 200 ML ### 68,237 65,742 68,445
3.14 TUBERÍA DRENAJE PVC 250 ML ### 92,630 89,778 92,867
3.15 TUBERÍA DRENAJE PVC 315 ML ### 126,050 123,555 126,258
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,093,820 1,065,303 1,096,196
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,573,814 1,516,781 1,578,567
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 2,113,251 1,999,186 2,122,757

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 46,092 46,092 46,092
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 60,954 60,954 60,954
4.3 COLUMNAS 3500 PSI M3 ### 965,978 888,109 972,467
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 325,441 291,705 347,823
4.5 ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 116,551 108,991 117,181

4.6 ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 137,734 128,662 138,490
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 154,828 142,732 155,836
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 163,484 150,632 164,555
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 188,840 172,964 190,163
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 210,687 192,543 212,199
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 234,170 213,758 235,871
4.12 ENTREPISO VIGUETA PLACA M2 ### 109,703 108,547 109,799
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
4.13 ESCALERA MACIZA 3500 PSI M3 ###
p 1,128,337 1,050,468 1,134,826
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### i 104,610 103,896 104,669
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### o 95,049 87,262 95,698
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 107,942 98,417 108,736
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 126,851 114,906 127,847
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 857,333 779,464 863,822
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 55,829 53,518 56,022
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 345,211 310,435 348,109
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,588 4,588 4,588
4.22 ACERO FIGURADO 60000 PSI KG ### 4,812 4,812 4,812
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,695 6,695 6,695
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 1,014,263 936,393 1,020,752
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 942,038 856,756 949,145
4.26 VIGA AÉREA 3500 PSI M3 ### 1,006,016 928,147 1,012,505
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 984,749 906,880 991,238
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,208,235 1,130,366 1,214,724
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 469,718 377,902 477,369

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 34,035 32,137 34,193
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 55,689 53,791 55,847
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 38,148 37,791 38,178
5.4 ARCOS EN LADRILLO PRENSADO ML ### 177,677 176,963 177,736
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 50,279 47,968 50,472
5.6 DINTELES EN BLOQUE 0.15 M ML ### 29,738 29,024 29,798
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 109,774 108,346 109,893
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 107,822 100,119 108,464
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 99,437 99,437 99,437
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 58,118 58,118 58,118
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 95,716 95,716 95,716
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 56,257 56,257 56,257
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 111,307 111,307 111,307
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 65,453 65,453 65,453
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 123,935 123,935 123,935
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 71,767 71,767 71,767
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 44,964 44,247 45,024
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 27,055 26,696 27,085
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 58,395 57,917 58,435
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 34,900 34,661 34,920
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 65,609 65,131 65,649
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 39,220 38,981 39,240
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 110,478 108,086 110,677
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 64,863 63,667 64,962
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 41,019 40,541 41,059
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 24,729 24,490 24,749
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 81,784 80,827 81,864
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 49,013 48,535 49,053
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 96,754 96,040 96,814
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 58,276 57,919 58,306
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 202,394 199,046 202,673
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 120,695 119,020 120,834
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 99,402 97,913 99,526
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 59,600 58,855 59,662
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 52,108 51,037 52,198
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ###
p 31,459 30,923 31,503
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### i 37,157 36,679 37,197
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### o 22,507 22,267 22,527
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 56,596 55,639 56,675
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 34,426 33,947 34,466
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 108,912 107,477 109,032
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 65,849 65,132 65,909
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 79,394 78,438 79,474
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 47,655 47,176 47,695
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 168,371 165,022 168,650
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 101,599 99,925 101,739
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 34,847 34,490 34,877
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 40,453 39,382 40,542
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 68,003 66,575 68,122
5.50 LAVADA DE FACHADA M2 ### 5,588 5,588 5,588
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 56,078 54,180 56,236
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,240 11,240 11,240
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,918 14,918 14,918
5.54 ANCLAJE 1/2" L=50CM UN ### 19,512 19,512 19,512
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 27,418 27,418 27,418
5.56 ANCLAJE 3/4" L=70CM UN ### 41,025 41,025 41,025
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 6,061 5,465 6,111

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,263 17,263 17,263
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,494 6,137 6,524
6.3 FILOS O DILATACIONES S/MURO ML ### 7,751 7,394 7,781
6.4 GOTERA EN MORTERO 1:4 ML ### 9,146 8,789 9,176
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,438 7,438 7,438
6.6 MALLA BAJO ENTRAMADO M2 ### 14,709 14,709 14,709
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 26,832 25,790 26,919
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 16,166 15,645 16,209
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 23,629 22,624 23,713
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 14,235 13,733 14,277
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 22,708 21,666 22,795
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,775 13,254 13,818
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 23,629 22,624 23,713
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 14,235 13,733 14,277
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 23,876 23,134 23,938
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 14,358 13,986 14,389
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 19,574 18,809 19,638
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,902 11,520 11,934
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 18,873 18,079 18,939
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,551 11,154 11,584
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 24,454 23,449 24,538
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 14,627 14,124 14,669
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 23,533 22,491 23,620
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,166 13,645 14,210
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 19,519 18,726 19,586
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,856 11,459 11,889
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 24,476 23,433 24,562
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 15,066 14,545 15,109

7 CUBIERTAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ###
p 30,220 28,785 30,340
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### i 95,127 91,275 95,448
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### o 60,567 60,567 60,567
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 24,056 24,056 24,056
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 37,804 37,804 37,804
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 88,573 88,573 88,573
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 69,310 69,310 69,310
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 40,217 40,217 40,217
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 92,837 92,837 92,837
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 110,899 110,899 110,899
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 163,083 163,083 163,083
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 64,259 64,259 64,259
7.13 CANAL PVC AMAZONAS ML ### 89,191 89,191 89,191
7.14 CANAL PVC RAINGO ML ### 81,045 81,045 81,045
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 144,248 144,248 144,248
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 84,298 84,298 84,298
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 61,878 61,878 61,878
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 35,067 35,067 35,067
7.19000000000001 TEJA DE BARRO M2 ### 65,989 64,204 66,138
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 51,590 51,590 51,590
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 47,284 47,284 47,284
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 39,759 39,759 39,759
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 38,941 38,941 38,941
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 39,237 39,237 39,237
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 55,330 55,330 55,330
7.26 TEJA PLÁSTICA No.6 M2 ### 48,620 48,620 48,620
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 89,122 89,122 89,122
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 164,745 164,745 164,745
7.29000000000001 TEJA SIN TRASLAPO M2 ### 73,995 73,995 73,995
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 46,078 46,078 46,078
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 36,155 36,155 36,155
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 63,265 63,265 63,265
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,648 21,648 21,648
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 26,088 26,088 26,088
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 28,301 28,301 28,301
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 36,499 36,499 36,499
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 24,040 24,040 24,040
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 56,627 56,627 56,627
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 390,756 390,756 390,756
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 440,565 440,565 440,565
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 296,078 296,078 296,078
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 316,578 316,578 316,578

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 586,977 507,804 593,575
8.2 CONCRETO 3500 PSI M3 ### 524,249 448,648 530,549
8.3 CONCRETO 3000 PSI M3 ### 529,687 449,811 536,343
8.4 CONCRETO 2500 PSI M3 ### 471,239 394,205 477,658
8.5 CONCRETO 2000 PSI M3 ### 457,246 374,871 464,111
8.6 CONCRETO 1500 PSI M3 ### 440,019 350,878 447,448
8.7 MORTERO SECO 1:10 M3 ### 307,445 258,179 311,550
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 535,976 488,138 539,962
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 492,116 442,493 496,251
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ###
p 556,660 510,250 560,527
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### i 804,840 758,430 808,707
o
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 134,484 134,484 134,484
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,650 4,293 4,680
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 150,302 150,302 150,302
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 184,276 184,276 184,276
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 268,667 268,667 268,667
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 299,084 299,084 299,084
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 329,534 329,534 329,534
9.8 HOJA PUERTA FORTEC 0.81 UN ### 218,966 218,966 218,966
9.9 HOJA PUERTA FORTEC 0.91 UN ### 248,274 248,274 248,274
9.10 HOJA PUERTA FORTEC 1.50 UN ### 365,504 365,504 365,504
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 138,371 138,371 138,371
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 183,797 183,797 183,797
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 204,312 204,312 204,312
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 520,833 520,833 520,833
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 45,886 45,886 45,886
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 28,468 28,468 28,468
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 108,466 108,466 108,466
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 133,162 133,162 133,162
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 103,415 103,415 103,415
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 31,964 31,964 31,964
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 31,964 31,964 31,964
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 30,293 30,293 30,293
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 46,293 46,293 46,293
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 57,393 57,393 57,393
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 69,233 69,233 69,233
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 83,293 83,293 83,293
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 393,104 393,104 393,104
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 274,701 274,701 274,701
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 36,673 36,673 36,673
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 47,033 47,033 47,033
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 57,393 57,393 57,393
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 72,193 72,193 72,193

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 83,010 83,010 83,010
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 231,840 231,840 231,840
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 87,744 87,744 87,744
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 156,546 156,546 156,546
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 148,870 148,870 148,870
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 97,733 97,733 97,733
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 230,595 230,595 230,595
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 119,967 119,967 119,967
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 7,188 7,188 7,188
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 107,839 107,839 107,839
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 132,178 132,178 132,178
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 44,418 44,418 44,418
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 591,536 591,536 591,536
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 212,428 212,428 212,428
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### p 237,817 237,817 237,817
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### i 539,006 539,006 539,006
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ###
o 139,375 139,375 139,375
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 431,560 431,560 431,560
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,571 6,571 6,571
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 303,127 303,127 303,127
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 132,795 132,795 132,795
10.21 REJILLA PISO 0.30 M M2 ### 94,129 94,129 94,129
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 97,084 97,084 97,084
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 11,402 11,402 11,402
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,


10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 12,672 12,672 12,672
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,


10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 10,034 10,034 10,034
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 239,983 239,983 239,983
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 289,987 289,987 289,987
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 24,056 24,056 24,056
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 37,804 37,804 37,804
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 36,209 36,209 36,209
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 46,478 46,478 46,478
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 95,983 95,983 95,983
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 241,480 241,480 241,480
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,989 46,989 46,989
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 38,032 38,032 38,032
11.13 NIPLE PASAMURO 2" UN ### 72,109 72,109 72,109
11.14 NIPLE PASAMURO 4" UN ### 107,827 107,827 107,827
11.15 PUNTO AGUA CALIENTE CPVC UN ### 91,227 91,227 91,227
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 66,258 66,258 66,258
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 70,548 70,548 70,548
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 89,162 89,162 89,162
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 72,046 72,046 72,046
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 90,356 90,356 90,356
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 96,699 96,699 96,699
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 80,389 80,389 80,389
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,600 13,600 13,600
11.24 RED SUMINISTRO CPVC 3/4" ML ### 19,188 19,188 19,188
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 25,044 25,044 25,044
11.26 RED SUMINISTRO PVC 1" ML ### 15,446 15,446 15,446
11.27 RED SUMINISTRO PVC 1/2" ML ### 9,210 9,210 9,210
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 55,885 55,885 55,885
11.29 RED SUMINISTRO PVC 2" ML ### 35,716 35,716 35,716
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,545 11,545 11,545
11.31 RED SANITARIA PVC-S 2" ML ### 27,552 27,552 27,552
11.32 RED SANITARIA PVC-S 3" ML ### 38,257 38,257 38,257
11.33 RED SANITARIA PVC-S 4" ML ### 51,936 51,936 51,936
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
11.34 RED SANITARIA PVC-S 6" ML ###
p 97,298 97,298 97,298
11.35 REGISTRO 1" UN ### i 117,969 117,969 117,969
11.36 REGISTRO 1/2" UN ### o 65,732 65,732 65,732
11.37 REGISTRO 3/4" UN ### 83,784 83,784 83,784
11.38 REGISTRO 1 1/2" UN ### 202,668 202,668 202,668
11.39 REGISTRO 2 1/2" UN ### 418,371 418,371 418,371
11.40 REGISTRO 2" UN ### 308,931 308,931 308,931
11.41 REVENTILACIÓN 2" ML ### 19,186 19,186 19,186
11.42 REVENTILACIÓN 3" ML ### 24,223 24,223 24,223
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 188,462 188,462 188,462
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 307,163 307,163 307,163
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 511,446 511,446 511,446
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 44,089 44,089 44,089
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 52,030 52,030 52,030
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 66,511 66,511 66,511
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 75,751 75,751 75,751
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 97,683 97,683 97,683
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 112,596 112,596 112,596
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 166,224 166,224 166,224
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 67,007 67,007 67,007
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 67,284 67,284 67,284
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 43,455 43,455 43,455
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 53,654 53,654 53,654
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,549 4,549 4,549
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 7,189 7,189 7,189
11.59 GABINETE TIPO III UN ### 1,109,245 1,109,245 1,109,245
11.60 GABINETE TIPO I UN ### 845,771 845,771 845,771
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,863,145 2,863,145 2,863,145
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,386,512 2,386,512 2,386,512
11.63 VÁLVULA MARIPOSA 3" UN ### 689,909 689,909 689,909
11.64 VÁLVULA MARIPOSA 4" UN ### 893,889 893,889 893,889
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 345,306 345,306 345,306

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 398,013 398,013 398,013
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 63,248 63,248 63,248
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 74,912 74,912 74,912
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 83,126 83,126 83,126
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 97,956 97,956 97,956
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 59,443 59,443 59,443
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 67,775 67,775 67,775
12.8 STRIP TELEFÓNICO 10 PARES UN ### 156,165 156,165 156,165
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 61,050 61,050 61,050
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 140,355 140,355 140,355
12.11 SALIDA T.V PVC COMPLETA. UN ### 83,890 83,890 83,890
12.12 SALIDA BIFÁSICA C.N. UN ### 49,754 49,754 49,754
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 104,740 104,740 104,740
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 447,096 447,096 447,096
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 595,786 595,786 595,786
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,859 3,859 3,859
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 5,094 5,094 5,094
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,930 7,930 7,930
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 14,179 14,179 14,179
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 298,083 298,083 298,083
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ###
p 84,130 84,130 84,130
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### i 114,050 114,050 114,050
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### o 46,277 46,277 46,277
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,524,373 1,524,373 1,524,373
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,129,179 1,129,179 1,129,179
12.26 POSTE METÁLICO 6M UN ### 1,416,934 1,416,934 1,416,934
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 660,893 660,893 660,893
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 120,313 120,313 120,313
12.29 LUMINARIA 70W SODIO UN ### 554,596 554,596 554,596
12.30 LUMINARIA 150W SODIO UN ### 693,991 693,991 693,991
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,833,922 1,833,922 1,833,922
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,350,346 1,350,346 1,350,346

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 44,641 42,856 44,790
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 44,484 42,699 44,633
13.3 ALISTADO PARA LISTÓN M2 ### 16,187 15,830 16,217
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 33,366 29,796 33,663
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 95,994 92,424 96,291
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 30,683 29,036 30,821
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 71,323 63,619 71,965
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 100,942 88,617 101,969
13.9 MANTO FIBERGLASS 600X1 M2 ### 33,244 33,244 33,244
13.10 PEGANTE MORTERO-CONCRETO M2 ### 25,005 25,005 25,005
13.11 PERMA PLY 2 CAPAS M2 ### 29,303 29,303 29,303
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 58,851 51,918 59,429
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 69,380 60,906 70,086
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 101,587 88,492 102,679
13.15 TRITURADO FINO 1/2 M3 ### 218,578 145,148 224,697
13.16 TRITURADO GRUESO 3/4 M3 ### 225,516 156,810 223,978

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 63,147 62,433 63,207
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 37,587 37,230 37,616
14.3 ADOQUÍN CONCRETO 6CM M2 ### 72,925 71,140 73,074
14.4 ADOQUÍN CONCRETO 8CM M2 ### 76,575 74,790 76,724
14.5 ADOQUÍN GRES PEATONAL M2 ### 81,245 79,460 81,394
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 83,277 82,563 83,337
14.7 GRAVILLA PARA GRADAS ML ### 41,009 40,087 41,086
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 182,699 179,486 182,967
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 52,319 50,117 52,502
14.10 GUARDAESCOBA EN GRANITO ML ### 47,633 47,633 47,633
14.11 GUARDAESCOBA EN GRAVILLA ML ### 11,969 11,047 12,046
14.12 GUARDAESCOBA PVC CARAMELO ML ### 10,338 10,338 10,338
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,888 13,888 13,888
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,508 11,508 11,508
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 19,355 19,355 19,355
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 37,819 37,819 37,819
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,982 9,982 9,982
14.18 LISTÓN M.H. AMARILLO M2 ### 81,465 81,465 81,465
14.19 PASO ESCALERA GRANITO ML ### 131,534 129,035 131,742
14.20 PIRLANES ALUMINIO ML ### 8,136 8,136 8,136
14.21 PIRLANES LADRILLO ML ### 35,472 34,758 35,532
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 50,467 50,467 50,467
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
14.23 PISO VINILO TRÁFICO PESADO M2 ###
p 58,704 58,704 58,704
14.24 PULIDA LACADA PISO MADERA M2 ### i 53,749 53,749 53,749
14.25 TABLETA DE GRES 25X25 M2 ### o 54,812 54,098 54,871
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 61,513 60,799 61,572
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,890 11,890 11,890
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 55,239 54,168 55,328
14.29 JABONERA PORCELANA ACUARIO UN ### 22,653 22,653 22,653
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 135,780 135,780 135,780
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,803 10,803 10,803
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 24,698 24,698 24,698
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,786 15,786 15,786
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 15,331 15,331 15,331
14.35 REMATES BOCEL ALUMINIO ML ### 9,266 9,266 9,266
14.36 REMATES BOCEL PORCELANA ML ### 9,432 9,432 9,432
14.37 TAPA REGISTRO 20X20 UN ### 20,899 20,899 20,899
14.38 TAPA REGISTRO 6X6 UN ### 19,031 19,031 19,031
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,662 20,662 20,662
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 23,886 23,886 23,886
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 72,294 71,580 72,354
14.42 MEDIA CAÑA EN GRANITO ML ### 85,499 85,499 85,499
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,845 36,845 36,845
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,528 14,528 14,528
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 112,490 112,490 112,490
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 135,989 135,989 135,989

15 CIELO RASO
15.1 APLIQUE YESO ML ### 80,305 80,305 80,305
15.2 ARMADURA MADERA Y MALLA M2 ### 39,006 39,006 39,006
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 60,662 60,662 60,662
15.4 CIELO RASO DURACUSTIC M2 ### 74,571 74,571 74,571
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 55,603 55,603 55,603
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 103,365 103,365 103,365
15.7 CORNISAS YESO ML ### 53,937 53,937 53,937
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 114,377 114,377 114,377
15.9 MALLA CON VENA M2 ### 14,604 14,604 14,604

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16.2 MENOR DE 5 KM) M3 ### 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 52,599 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 172,587 146,223 142,708
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 189,743 127,565 194,924
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 254,672 194,913 240,611
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 171,844 124,389 133,177
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 222,434 162,676 208,373
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 251,106 191,347 237,045
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
p
17 APARATOS SANITARIOS i
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### o 332,737 332,737 332,737
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 982,789 982,789 982,789
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 532,089 532,089 532,089
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 153,389 153,389 153,389
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 215,360 215,360 215,360
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 199,930 199,930 199,930
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 441,383 441,383 441,383
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,130,411 1,130,411 1,130,411
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 320,343 320,343 320,343
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 226,511 226,511 226,511
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 89,547 89,547 89,547
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA)
UN ### 274,624 274,624 274,624

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE


17.13 ACCESORIOS Y GRIFERÍA)
UN ### 405,042 405,042 405,042

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 9,065 9,065 9,065
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,369 3,369 3,369
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 12,027 12,027 12,027
18.4 BARNIZ SOBRE MUEBLES M2 ### 46,024 46,024 46,024
18.5 CARBURO SOBRE PAÑETES M2 ### 6,307 6,307 6,307
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 72,424 72,424 72,424
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,744 3,744 3,744
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 3,019 3,019 3,019
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 15,120 15,120 15,120
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,387 4,387 4,387
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,947 15,947 15,947
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,286 6,286 6,286
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 7,143 7,143 7,143
18.14 ESTUCO M2 ### 7,571 7,571 7,571
18.15 ESTUCO (LINEAL) ML ### 4,734 4,734 4,734
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,817 16,817 16,817
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,400 10,400 10,400
18.18 LACA PISOS MADERA M2 ### 24,563 24,563 24,563
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,907 2,907 2,907
18.20 MARMOLINA SOBRE PAÑETE M2 ### 13,306 13,306 13,306
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,586 3,586 3,586
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,673 13,673 13,673
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,681 7,681 7,681
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,816 4,816 4,816
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 23,803 23,803 23,803
18.26 PINTURA EPÓXICA M2 ### 13,718 13,718 13,718
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,459 8,459 8,459

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,699,434 6,699,434 6,699,434
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR
19.2 (PAR)
UN ### 11,836,832 11,836,832 11,836,832
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,097,587 3,097,587 3,097,587
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 10,123,417 10,123,417 10,123,417
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,480,965 9,480,965 9,480,965
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ###
p 2,907 2,907 2,907
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### i 949,966 949,966 949,966
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### o 95,021 95,021 95,021
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,721,138 1,720,346 1,721,204
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 764,315 744,346 765,979

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 31,728 31,728 31,728
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 47,423 47,423 47,423
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 58,898 58,898 58,898
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 19,016 19,016 19,016
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 23,113 23,113 23,113
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 31,592 31,592 31,592
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,793 27,793 27,793
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 29,334 29,334 29,334
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 36,782 36,782 36,782
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 19,369 19,369 19,369
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 25,413 25,413 25,413
20.12 VÁLVULA DE BOLA GAS 1" UN ### 39,144 39,144 39,144
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 300,311 300,311 300,311
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 345,755 345,755 345,755
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 360,445 360,445 360,445
20.16 ACOMETIDA GAS 1/2" ML ### 334,105 334,105 334,105

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 244,113 244,113 244,113
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 37,492 37,492 37,492
21.3 SIRENA DE 110 V UN ### 113,719 113,719 113,719
21.4 CÁMARA CCTV UN ### 286,869 286,869 286,869
21.5 PARLANTE-CIELO FALSO UN ### 56,848 56,848 56,848
21.6 AMPLIFICADOR 100W UN ### 630,068 630,068 630,068
21.7 AMPLIFICADOR 300W UN ### 1,566,465 1,566,465 1,566,465
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 48,098 48,098 48,098
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 244,421 244,421 244,421
21.10 TOMA PARA MICRÓFONO UN ### 47,897 47,897 47,897
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 4,125 4,125 4,125
21.12 SPLITERS UN ### 6,958 6,958 6,958
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 20,126 20,126 20,126
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 26,387 26,387 26,387
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 34,333 34,333 34,333
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 135,087 135,087 135,087
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 35,233 35,233 35,233
21.18 BANDEJA PORTACABLES PARA RACK UN ### 115,426 115,426 115,426
21.19 RACK 2' X 24" UN ### 199,981 199,981 199,981
21.20 RACK 3' X 24" UN ### 315,745 315,745 315,745
21.21 RACK 5' X 24" UN ### 391,558 391,558 391,558
21.22 RACK 7' X 24" UN ### 428,192 428,192 428,192
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 625,002 625,002 625,002
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 367,578 367,578 367,578
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 114,473 114,473 114,473
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 15,279 15,279 15,279
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 31,252 31,252 31,252
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,465 5,465 5,465
21.29 CANALETA METÁLICA 4X6 CMS ML ### 38,398 38,398 38,398
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
21.30 CANALETA METÁLICA 4X10 CMS ML ###
p 40,144 40,144 40,144
21.31 CANALETA METÁLICA 6X10 CMS ML ### i 41,017 41,017 41,017
21.32 CANALETA PLÁSTICA 13X7 MM ML ### o 26,750 26,750 26,750
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 29,622 29,622 29,622
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 30,829 30,829 30,829
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 52,042 52,042 52,042
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 674,762 674,762 674,762
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 345,980 345,980 345,980
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 96,327 96,327 96,327
21.39 CABLE TELEFÓNICO 2 PARES ML ### 2,003 2,003 2,003
21.40 CABLE TELEFÓNICO 10 PARES ML ### 9,257 9,257 9,257
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,849 13,849 13,849
21.42 CABLE TELEFÓNICO 40 PARES ML ### 23,146 23,146 23,146
21.43 CABLE TELEVISIÓN RG6 ML ### 4,274 4,274 4,274
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 24,070 24,070 24,070
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 35,128 35,128 35,128
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 21,025 21,025 21,025
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 16,802 16,802 16,802
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 682,490 682,490 682,490
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
URBANISMO p
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 29,801 29,801 29,801
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 99,868 99,868 99,868
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 563,010 563,010 563,010
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,201,725 1,201,725 1,201,725
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 137,679 137,679 137,679
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 839,297 839,297 839,297
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,806,598 1,806,598 1,806,598
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 14,289 14,289 14,289
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 17,655 17,655 17,655
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 22,202 22,202 22,202
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 24,312 24,312 24,312
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 29,173 29,173 29,173
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 29,173 29,173 29,173
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 117,708 117,708 117,708
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 136,324 136,324 136,324
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 421,959 421,959 421,959
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 158,475 158,475 158,475
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 261,242 261,242 261,242
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,156,404 1,156,404 1,156,404
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,332,395 1,332,395 1,332,395
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 15,543 15,543 15,543
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,704 13,704 13,704
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 34,058 34,058 34,058
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 134,863 134,863 134,863
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 200,978 200,978 200,978
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 32,773 32,773 32,773
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 113,012 113,012 113,012
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 167,612 167,612 167,612
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 33,155 33,155 33,155
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 68,399 68,399 68,399
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 275,787 275,787 275,787
1.32 UNIÓN REPARACION PVC 4" UN ### 79,829 79,829 79,829
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 320,921 320,921 320,921
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 192,044 192,044 192,044
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 547,636 547,636 547,636
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,468,159 1,468,159 1,468,159
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,169,427 2,169,427 2,169,427

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,612 11,612 11,612
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 26,508 26,508 26,508
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 137,095 88,645 141,132
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 167,295 140,931 137,416
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 177,398 129,943 138,731
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 89,277 141,544 141,544
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 96,661 119,645 143,674
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 142,406 95,996 146,273

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 125,834 125,834 125,834
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ###
p 1,312,876 1,312,876 1,312,876
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### i 164,476 164,476 164,476
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### o 1,520,665 1,520,665 1,520,665
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,059,816 1,059,816 1,059,816
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 64,156 64,156 64,156
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 124,914 124,914 124,914
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 295,063 295,063 295,063
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 295,056 295,056 295,056
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 473,752 473,752 473,752
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 124,966 124,966 124,966
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 124,966 124,966 124,966
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 295,063 295,063 295,063
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 295,063 295,063 295,063
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 473,752 473,752 473,752
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 473,982 473,982 473,982
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 770,808 770,808 770,808
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,237,582 1,237,582 1,237,582
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 76,536 76,536 76,536
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 396,317 396,317 396,317
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 446,140 446,140 446,140
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,233,189 1,233,189 1,233,189
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 72,558 72,079 72,597
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 359,100 359,100 359,100
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 54,842 54,842 54,842
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 77,601 77,601 77,601
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 112,025 112,025 112,025
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 171,981 171,981 171,981
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 276,479 276,479 276,479
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 400,126 400,126 400,126
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 506,641 506,641 506,641
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 666,270 666,270 666,270
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 917,042 917,042 917,042

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 785,028 737,102 789,021
4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 722,631 699,890 724,526
4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 814,685 782,735 817,348
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 936,661 876,754 941,653
4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 1,027,709 995,686 1,030,377

4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 949,476 905,545 953,137
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,088,408 1,068,833 1,090,037
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,618,970 1,557,954 1,624,050
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,285,597 2,161,487 2,295,940
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 3,075,774 2,869,473 3,092,966
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 2,004,130 2,004,130 2,004,130
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,244,447 4,244,447 4,244,447
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y
4.13 DEMOLICIÓN)
UN ### 149,972 149,044 150,049

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 81,793 79,294 82,002
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ###
p 96,613 94,114 96,822
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### i 69,745 61,656 70,419
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### o 75,882 67,495 76,581
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 75,311 67,373 75,972
5.6 BORDE SEPARADOR VERDE A-170 ML ### 278,346 277,417 278,423
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 20,836 19,865 20,917
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 49,770 44,070 50,245
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 91,105 90,609 91,146
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 612,452 599,020 613,571
5.11 LOSETA PREFABRICADA A-40 M2 ### 69,322 67,198 69,499
5.12 LOSETA PREFABRICADA A-60 M2 ### 100,369 98,245 100,546
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 40,125 36,770 40,404
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 66,366 59,576 66,931
5.15 SARDINEL PREFABRICADO A-10 ML ### 117,881 110,619 116,330
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 66,280 64,995 66,387

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 226,064 222,071 226,397
6.2 BANCA EN CONCRETO M-30 UN ### 734,983 729,391 735,449
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 234,939 234,116 235,008
6.4 BOLARDO M-60 CONCRETO UN ### 181,865 177,073 182,265
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 183,845 179,053 184,244
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 214,915 209,972 215,327
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 65,114 63,200 65,273
6.8 BORDILLO PREFABRICADO A-80 ML ### 75,889 73,747 76,067
6.9 CANECA M-120 UN ### 341,111 340,633 341,151
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 901,101 898,705 901,301
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,693,210 3,691,613 3,693,343
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,799,280 3,797,683 3,799,413
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 532,592 530,945 532,730
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 710,798 704,208 711,347
6.15 BANCA EN MADERA M-50 UN ### 583,638 583,638 583,638
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 272,471 270,075 272,671
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 629,628 628,432 629,728
6.18 POSTE HISTÓRICO M-131 UN ### 7,030,199 7,018,218 7,031,198

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,407 4,407 4,407
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 46,945 46,945 46,945
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 342,331 341,866 342,369
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 541,181 537,886 541,455
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 254,131 253,667 254,170
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 270,045 269,581 270,084
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 282,097 281,633 282,136
7.8 TACHAS REFLECTIVAS UN ### 14,707 14,707 14,707
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,714 15,714 15,714
7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 128,478 128,478 128,478
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS p 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM) M3 ### 157,537 157,537 157,537

1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 55,330 55,330 55,330

1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.4 200.2 DISTANCIA DE 5KM) HA ### 968,634 968,634 968,634

1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y


1.6 *** DERRUMBES
M3-KM### 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,869 36,869 36,869
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 13,186 13,186 13,186

2.9 600.1 EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.10 600.2 KM)
M3 ### 67,506 67,506 67,506

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2.11 600.3 5 KM)
M3 ### 82,672 82,672 82,672

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 600.4 MENOR DE 5 KM)
M3 ### 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 600.4 P DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.14 600.5 DISTANCIA MENOR DE 5 KM)
M3 ### 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.15 600.5 P DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 222,434 162,676 208,373
3.3 330.1 BASE GRANULAR M3 ### 251,106 191,347 237,045
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON
3.4 365.1 CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,487 3,487 3,487
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,193 1,193 1,193
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 251,282 238,497 252,347
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 74,772 71,271 75,064
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 690,218 659,798 734,158
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 717,853 687,433 761,793
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 758,011 727,591 801,951
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 725,529 695,109 769,469
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### p 268,597 184,292 259,516
i
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### o 413,059 353,301 398,998
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 382,883 323,124 368,822
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 41,569 41,569 41,569

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 185,735 185,735 185,735
3.15 311.1 AFIRMADO M3 ### 171,844 124,389 133,177
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 13,292 12,369 13,369
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,447 4,985 5,485
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.18 500.1 UNIÓN
M3 ### 767,629 695,945 773,603

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.19 500.1 UNIÓN
M3 ### 806,285 731,391 812,526

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.20 500.1 UNIÓN
M3 ### 831,090 754,412 837,480

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E


3.21 *** INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,563 7,563 7,563
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 125,777 158,495 192,701

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 1,067,071 985,758 1,073,847
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 931,157 851,193 937,821
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 984,029 900,897 990,957
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 702,231 625,874 708,594
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 807,580 728,199 814,195
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 707,724 627,049 714,446
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 813,290 729,420 820,279
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 873,295 792,620 880,017
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 732,186 648,316 739,175
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 923,875 840,005 930,863
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,672 12,672 12,672
4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG ### 16,322 16,322 16,322
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,915 1,915 1,915
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4.14 621.1 REFUERZO Y ANILLOS)
ML ### 2,878,098 2,878,098 2,878,098

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN
4.15 621.1 P CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS) ML ### 4,531,908 4,392,820 4,543,499
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,908,082 1,828,206 1,914,738
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3)### 94,661 94,661 94,661
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 396,754 387,169 397,553
4.19 632 P BARANDA METÁLICA ML ### 454,267 454,267 454,267
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 18,357 18,357 18,357
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 667,193 558,644 650,009
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 105,259 181,106 181,106
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 165,277 140,941 137,697
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 510,280 427,081 517,214
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 457,893 420,366 486,348
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 466,564 429,037 495,019
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 466,289 431,966 494,477
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 474,960 440,637 503,148
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 642,497 564,692 648,980
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 745,725 664,840 752,465
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
4.31 681.1 GAVIÓN M3 ###
p 219,594 250,825 283,476
4.32 681.1 GAVIÓN MALLA PVC M3 ### i 224,137 255,368 288,019
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### o 50,714 45,938 51,112
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 20,268 17,880 20,467
4.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 ### 10,964 10,964 10,964
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 15,653 15,653 15,653
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 21,083 21,083 21,083
4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 ### 25,284 25,284 25,284

4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 ### 32,503 32,503 32,503

4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,869 7,869 7,869

4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,972 8,972 8,972

4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,326 9,326 9,326

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,634 6,634 6,634

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 10,009 10,009 10,009

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,156 8,156 8,156

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 10,009 10,009 10,009

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 19,264 19,264 19,264

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE


4.48 661.1 EMBOQUILLADA
ML ### 685,615 684,894 685,676
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 413,345 395,941 414,795
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 959,992 959,992 959,992
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 239,372 193,742 202,192
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,812 4,812 4,812
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 93,501 93,501 93,501
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 142,500 142,500 142,500
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 655,377 574,492 662,117
4.56 682.1 P COLCHONETA RENO M3 ### 236,592 267,823 300,474
4.57 *** TRINCHO EN MADERA M2 ### 73,948 73,948 73,948

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,407 4,407 4,407
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 46,945 46,945 46,945
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 91,206 91,206 91,206
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 75,849 75,849 75,849
5.5 730.1 DEFENSA METÁLICA ML ### 162,420 159,503 162,663
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 14,707 14,707 14,707

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 878 878 878
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE
6.2 801.6 DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
UN ### 139,847 139,847 139,847

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A


6.3 801.7 UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: BAJO MAGDALENA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN YnTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Puerto_Salgar Guaduas Caparrapí
i
6.6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### p 1,804 1,804 1,804
i
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### o 16,222 16,222 16,222
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 26,374 26,374 26,374
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,829 9,829 9,829

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO
SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
CONSTRUCCIÓN
1 PRELIMINARES
1.1 CAMPAMENTO 18 M2 UN 2,063,035 2,139,588 2,141,689 2,142,739 2,139,588 2,132,233 2,126,981 2,153,246 2,121,728 2,163,751 2,139,588 2,145,891 2,111,222
1.2 CAMPAMENTO 9 M2 UN 1,205,662 1,245,932 1,246,982 1,247,508 1,245,932 1,242,255 1,239,628 1,252,761 1,237,002 1,258,014 1,245,932 1,249,083 1,231,749
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 14,712 14,935 14,935 14,935 14,935 14,935 14,935 14,935 14,935 14,935 14,935 14,935 14,935
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 16,489 16,742 16,742 16,742 16,742 16,742 16,742 16,742 16,742 16,742 16,742 16,742 16,742
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 19,085 19,365 19,365 19,365 19,365 19,365 19,365 19,365 19,365 19,365 19,365 19,365 19,365
1.6 CERCA EN TABLA H=2.30 M ML 67,397 69,169 69,169 69,169 69,169 69,169 69,169 69,169 69,169 69,169 69,169 69,169 69,169
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML 47,441 48,955 48,978 48,990 48,955 48,874 48,817 49,105 48,759 49,220 48,955 49,024 48,644
1.8 CERCA EN TELA VERDE H = 2.10 M ML 22,111 22,904 22,927 22,938 22,904 22,823 22,766 23,053 22,708 23,168 22,904 22,973 22,593
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN 925,136 954,875 955,602 954,424 953,780 953,074 951,504 953,883 950,928 956,726 953,681 954,769 948,285
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS
1.41 DE PRESICIÓN
M2 10,604 10,862 10,862 10,862 10,862 10,862 10,862 10,862 10,862 10,862 10,862 10,862 10,862
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 3,856 3,955 3,955 3,955 3,955 3,955 3,955 3,955 3,955 3,955 3,955 3,955 3,955
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 2,749,047 2,827,884 2,827,884 2,827,884 2,827,884 2,827,884 2,827,884 2,827,884 2,827,884 2,827,884 2,827,884 2,827,884 2,827,884
1.44 RED TELEFÓNICA PROVISIONAL UN 255,430 261,902 261,902 261,902 261,902 261,902 261,902 261,902 261,902 261,902 261,902 261,902 261,902
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE)
M3 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 88,881 107,556 112,829 91,738 89,980 84,707 81,192 95,253 74,162 119,859 88,222 86,465 54,828
2.2 BASE ARENA CEMENTO 1:20 M3 198,557 266,999 269,453 270,680 266,999 258,410 252,274 282,951 246,139 295,221 266,999 274,362 233,869
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 22,738 23,335 23,335 23,335 23,335 23,335 23,335 23,335 23,335 23,335 23,335 23,335 23,335
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 662,846 707,058 709,312 710,439 707,058 699,169 693,535 721,707 687,901 732,976 707,058 713,819 676,633
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 666,770 711,252 713,596 714,768 711,252 703,047 697,188 726,488 691,327 738,209 711,252 718,284 679,606
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 621,617 662,672 664,867 665,964 662,672 654,989 649,502 676,938 644,014 687,913 662,672 669,257 633,040
2.9 PILOTE DE MADERA D=20 CM ML 50,983 51,281 51,281 51,281 51,281 51,281 51,281 51,281 51,281 51,281 51,281 51,281 51,281
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE
2.10 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 157,427 158,395 158,395 158,395 158,395 158,395 158,395 158,395 158,395 158,395 158,395 158,395 158,395

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE


2.11 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 196,070 198,227 198,227 198,227 198,227 198,227 198,227 198,227 198,227 198,227 198,227 198,227 198,227

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE


2.12 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML 242,801 246,396 246,396 246,396 246,396 246,396 246,396 246,396 246,396 246,396 246,396 246,396 246,396

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE


2.13 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML 305,708 311,239 311,239 311,239 311,239 311,239 311,239 311,239 311,239 311,239 311,239 311,239 311,239
2.14 PILOTE HINCADO 25X25 ML 108,051 111,676 111,837 111,917 111,676 111,114 110,713 112,720 110,311 113,523 111,676 112,158 109,508
2.15 PILOTE HINCADO 30X30 ML 133,307 138,560 138,793 138,909 138,560 137,746 137,164 140,073 136,582 141,237 138,560 139,258 135,418
2.16 DADOS EN CONCRETO 3500PSI M3 606,619 647,674 649,869 650,966 647,674 639,991 634,504 661,940 629,016 672,915 647,674 654,258 618,042
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM)
ML 94,308 94,945 94,945 94,945 94,945 94,945 94,945 94,945 94,945 94,945 94,945 94,945 94,945

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 39,581 40,833 40,848 40,856 40,833 40,780 40,741 40,932 40,703 41,008 40,833 40,879 40,627
3.2 SIFÓN EN PVC 6" UN 202,557 208,930 208,945 208,953 208,930 208,876 208,838 209,029 208,800 209,105 208,930 208,975 208,724
3.3 CAJA DE INSPECCIÓN DE 100X100 UN 475,621 497,236 502,206 491,891 488,151 486,032 475,670 482,059 473,566 500,305 487,325 493,153 456,971
3.4 CAJA DE INSPECCIÓN DE 40X40 UN 235,673 241,798 242,408 241,634 241,031 240,183 238,830 241,762 238,174 244,258 240,962 242,027 235,818
3.5 CAJA DE INSPECCIÓN DE 60X60 UN 269,853 277,898 278,885 277,683 276,694 275,264 273,070 278,022 271,970 282,082 276,585 278,342 268,128
3.6 CAJA DE INSPECCIÓN DE 80X80 UN 355,475 367,152 368,448 367,399 365,949 363,440 360,475 369,279 358,605 374,879 365,839 368,521 353,223
3.7 DUCTO ELÉCTRICO PVC 4" ML 109,695 110,787 110,837 110,708 110,678 110,688 110,588 110,539 110,588 110,708 110,668 110,708 110,439
3.8 POZO SÉPTICO ETERNIT 1000 LT UN 1,310,972 1,351,591 1,352,089 1,350,795 1,350,497 1,350,596 1,349,601 1,349,104 1,349,601 1,350,795 1,350,397 1,350,795 1,348,109
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 119,003 125,866 126,034 126,118 125,866 125,276 124,855 126,961 124,434 127,803 125,866 126,371 123,592
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 74,763 78,918 79,006 79,051 78,918 78,607 78,384 79,495 78,162 79,940 78,918 79,184 77,718
3.11 TUBERÍA DRENAJE PVC 110 ML 28,719 29,961 29,999 30,018 29,961 29,828 29,733 30,209 29,637 30,399 29,961 30,075 29,447
3.12 TUBERÍA DRENAJE PVC 160 ML 46,092 47,866 47,904 47,923 47,866 47,733 47,637 48,114 47,542 48,304 47,866 47,980 47,352
3.13 TUBERÍA DRENAJE PVC 200 ML 60,388 62,835 62,888 62,915 62,835 62,648 62,515 63,181 62,381 63,448 62,835 62,995 62,115
3.14 TUBERÍA DRENAJE PVC 250 ML 82,509 85,778 85,839 85,870 85,778 85,565 85,413 86,175 85,260 86,479 85,778 85,961 84,955
3.15 TUBERÍA DRENAJE PVC 315 ML 113,999 118,175 118,228 118,255 118,175 117,988 117,854 118,521 117,721 118,788 118,175 118,335 117,454
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3.16 MATERIAL FILTRANTE) UN 977,833 1,016,605 1,017,215 1,017,519 1,016,605 1,014,471 1,012,947 1,020,567 1,011,423 1,023,615 1,016,605 1,018,434 1,008,375

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE


3.17 MATERIAL FILTRANTE)
UN 1,379,798 1,441,731 1,442,950 1,443,560 1,441,731 1,437,464 1,434,416 1,449,656 1,431,368 1,455,752 1,441,731 1,445,389 1,425,272

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE


3.18 MATERIAL FILTRANTE)
UN 1,794,188 1,889,688 1,892,126 1,893,346 1,889,688 1,881,154 1,875,058 1,905,538 1,868,962 1,917,730 1,889,688 1,897,003 1,856,770

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 43,428 44,528 44,528 44,528 44,528 44,528 44,528 44,528 44,528 44,528 44,528 44,528 44,528
4.2 CASETÓN DE LONA 0.80X0.70 M2 57,194 58,746 58,746 58,746 58,746 58,746 58,746 58,746 58,746 58,746 58,746 58,746 58,746
4.3 COLUMNAS 3500 PSI M3 835,800 880,023 882,218 883,315 880,023 872,340 866,853 894,290 861,366 905,264 880,023 886,608 850,391
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 269,056 282,072 285,862 281,907 279,146 273,402 268,523 288,740 264,479 301,006 278,729 287,592 253,467
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4.5 MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 101,275 106,654 106,867 106,973 106,654 105,908 105,375 108,039 104,842 109,104 106,654 107,293 103,777

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.


4.6 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2 119,316 125,806 126,062 126,190 125,806 124,911 124,272 127,468 123,632 128,747 125,806 126,573 122,354

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN


4.7 REFUERZO)
M2 134,240 141,261 141,602 141,772 141,261 140,068 139,215 143,477 138,363 145,182 141,261 142,284 136,658
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN
4.8 REFUERZO)
M2 141,621 149,075 149,438 149,619 149,075 147,807 146,902 151,430 145,996 153,241 149,075 150,162 144,185

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN


4.9 REFUERZO)
M2 162,114 171,207 171,654 171,878 171,207 169,641 168,522 174,116 167,403 176,353 171,207 172,550 165,165

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN


4.10 REFUERZO) M2 180,252 190,599 191,110 191,366 190,599 188,809 187,530 193,923 186,251 196,480 190,599 192,133 183,694

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN


4.11 REFUERZO)
M2 200,058 211,646 212,221 212,509 211,646 209,632 208,194 215,386 206,755 218,262 211,646 213,372 203,878
4.12 ENTREPISO VIGUETA PLACA M2 102,670 105,519 105,556 105,575 105,519 105,389 105,297 105,761 105,204 105,946 105,519 105,631 105,018
4.13 ESCALERA MACIZA 3500 PSI M3 988,296 1,036,585 1,038,780 1,039,877 1,036,585 1,028,902 1,023,416 1,050,852 1,017,928 1,061,826 1,036,585 1,043,170 1,006,953
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 98,066 101,024 101,057 101,073 101,024 100,911 100,830 101,235 100,749 101,397 101,024 101,122 100,587
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 81,891 86,372 86,591 86,701 86,372 85,603 85,055 87,798 84,506 88,896 86,372 87,030 83,409
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 92,079 97,464 97,732 97,866 97,464 96,524 95,853 99,209 95,181 100,551 97,464 98,269 93,839
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 107,223 113,867 114,203 114,371 113,867 112,688 111,846 116,055 111,005 117,738 113,867 114,877 109,321
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 732,407 774,466 776,661 777,758 774,466 766,783 761,296 788,732 755,808 799,707 774,466 781,051 744,834
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI
4.19 (ANCHO 1 M)
UN 51,639 53,165 53,233 53,267 53,165 52,928 52,758 53,607 52,588 53,947 53,165 53,369 52,248

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 290,527 308,855 309,835 310,325 308,855 305,424 302,973 315,226 300,522 320,128 308,855 311,796 295,621
4.21 ACERO FIGURADO 37000 PSI KG 4,296 4,416 4,416 4,416 4,416 4,416 4,416 4,416 4,416 4,416 4,416 4,416 4,416
4.22 ACERO FIGURADO 60000 PSI KG 4,505 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631
4.23 REFUERZO MALLA ELECTROSOLDADA KG 6,384 6,513 6,513 6,513 6,513 6,513 6,513 6,513 6,513 6,513 6,513 6,513 6,513
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 887,312 930,205 932,400 933,497 930,205 922,522 917,035 944,471 911,547 955,446 930,205 936,789 900,573
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 806,573 852,028 854,430 855,630 852,028 843,620 837,616 867,641 831,610 879,651 852,028 859,234 819,599
4.26 VIGA AÉREA 3500 PSI M3 878,084 921,381 923,576 924,673 921,381 913,699 908,212 935,648 902,724 946,623 921,381 927,966 891,749
4.27 VIGA CINTA 3500 PSI M3 856,781 900,093 902,288 903,385 900,093 892,410 886,923 914,360 881,436 925,334 900,093 906,678 870,461
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 1,079,488 1,123,121 1,125,316 1,126,413 1,123,121 1,115,438 1,109,951 1,137,387 1,104,463 1,148,362 1,123,121 1,129,706 1,093,489
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 328,680 370,481 372,885 374,087 370,481 362,064 356,053 386,111 350,041 398,135 370,481 377,694 338,018

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 31,108 32,427 32,488 32,518 32,427 32,215 32,064 32,821 31,912 33,123 32,427 32,609 31,610
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 52,663 54,023 54,083 54,113 54,023 53,811 53,659 54,416 53,508 54,719 54,023 54,204 53,205
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 36,585 37,470 37,485 37,493 37,470 37,417 37,379 37,569 37,340 37,645 37,470 37,516 37,264
5.4 ARCOS EN LADRILLO PRENSADO ML 171,238 174,377 174,407 174,422 174,377 174,270 174,194 174,575 174,117 174,727 174,377 174,468 173,965
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 46,145 47,648 47,716 47,750 47,648 47,410 47,240 48,090 47,071 48,429 47,648 47,852 46,731
5.6 DINTELES EN BLOQUE 0.15 M ML 28,544 29,297 29,329 29,346 29,297 29,184 29,102 29,508 29,021 29,670 29,297 29,394 28,859
5.7 ENCHAPES LADRILLO PRENSADO M2 101,994 106,165 106,225 106,256 106,165 105,951 105,799 106,561 105,646 106,866 106,165 106,347 105,341

5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 94,190 99,140 99,366 99,479 99,140 98,347 97,781 100,612 97,215 101,744 99,140 99,819 96,082

5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 94,755 96,688 96,688 96,688 96,688 96,688 96,688 96,688 96,688 96,688 96,688 96,688 96,688
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 55,776 56,743 56,743 56,743 56,743 56,743 56,743 56,743 56,743 56,743 56,743 56,743 56,743
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 91,307 93,127 93,127 93,127 93,127 93,127 93,127 93,127 93,127 93,127 93,127 93,127 93,127
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 54,053 54,963 54,963 54,963 54,963 54,963 54,963 54,963 54,963 54,963 54,963 54,963 54,963
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 105,512 107,896 107,896 107,896 107,896 107,896 107,896 107,896 107,896 107,896 107,896 107,896 107,896
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 62,556 63,748 63,748 63,748 63,748 63,748 63,748 63,748 63,748 63,748 63,748 63,748 63,748
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 117,211 119,977 119,977 119,977 119,977 119,977 119,977 119,977 119,977 119,977 119,977 119,977 119,977
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 68,405 69,788 69,788 69,788 69,788 69,788 69,788 69,788 69,788 69,788 69,788 69,788 69,788
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 42,212 43,831 43,862 43,877 43,831 43,724 43,647 44,030 43,571 44,184 43,831 43,923 43,418
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 25,679 26,488 26,503 26,511 26,488 26,435 26,396 26,588 26,358 26,664 26,488 26,534 26,281
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 54,778 56,598 56,619 56,629 56,598 56,527 56,476 56,731 56,424 56,833 56,598 56,659 56,322
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 33,091 34,001 34,011 34,016 34,001 33,965 33,940 34,068 33,914 34,119 34,001 34,032 33,863
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 61,634 63,599 63,620 63,630 63,599 63,528 63,477 63,732 63,426 63,834 63,599 63,661 63,324
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 37,233 38,216 38,226 38,231 38,216 38,180 38,154 38,282 38,129 38,333 38,216 38,246 38,078
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 102,381 107,357 107,459 107,510 107,357 106,999 106,744 108,020 106,488 108,531 107,357 107,663 105,978
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 60,814 63,302 63,353 63,379 63,302 63,123 62,996 63,634 62,868 63,889 63,302 63,455 62,613
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 38,725 40,007 40,028 40,038 40,007 39,936 39,885 40,140 39,833 40,242 40,007 40,068 39,731
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 23,582 24,223 24,233 24,239 24,223 24,187 24,162 24,290 24,136 24,341 24,223 24,254 24,085
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 76,871 79,535 79,576 79,596 79,535 79,392 79,290 79,801 79,188 80,005 79,535 79,658 78,984
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 46,557 47,888 47,909 47,919 47,888 47,817 47,766 48,021 47,715 48,123 47,888 47,950 47,613
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 91,034 93,653 93,686 93,702 93,653 93,540 93,459 93,864 93,378 94,026 93,653 93,751 93,216
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 55,416 56,726 56,742 56,750 56,726 56,669 56,628 56,831 56,588 56,912 56,726 56,774 56,507
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 187,419 195,851 195,994 196,066 195,851 195,351 194,993 196,781 194,636 197,496 195,851 196,280 193,921
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 113,207 117,423 117,495 117,531 117,423 117,173 116,994 117,888 116,816 118,245 117,423 117,638 116,458
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 93,664 96,299 96,363 96,394 96,299 96,077 95,918 96,712 95,759 97,030 96,299 96,490 95,441

5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 56,731 58,048 58,080 58,096 58,048 57,937 57,858 58,255 57,778 58,414 58,048 58,144 57,619

5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 48,547 50,761 50,807 50,830 50,761 50,601 50,487 51,059 50,373 51,287 50,761 50,898 50,144
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 29,678 30,785 30,808 30,819 30,785 30,705 30,648 30,934 30,591 31,048 30,785 30,854 30,476
5.37 MURO TOLETE COMÚN 0.06 M M2 35,121 36,280 36,301 36,311 36,280 36,209 36,158 36,413 36,107 36,515 36,280 36,342 36,004
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 21,489 22,068 22,078 22,084 22,068 22,032 22,007 22,135 21,981 22,186 22,068 22,099 21,930
5.39 MURO TOLETE COMÚN 0.12 M M2 52,784 54,997 55,038 55,058 54,997 54,854 54,752 55,263 54,650 55,467 54,997 55,120 54,445
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 32,520 33,626 33,647 33,657 33,626 33,555 33,504 33,759 33,453 33,861 33,626 33,688 33,351
5.41 MURO TOLETE COMÚN 0.25 M M2 101,704 105,627 105,688 105,719 105,627 105,412 105,259 106,025 105,106 106,331 105,627 105,811 104,799
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 62,245 64,206 64,237 64,252 64,206 64,099 64,023 64,406 63,946 64,559 64,206 64,298 63,793
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 74,321 77,063 77,104 77,124 77,063 76,920 76,818 77,329 76,716 77,533 77,063 77,186 76,511
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
5.44 (LINEAL)
ML 45,071 46,461 46,482 46,492 46,461 46,390 46,339 46,594 46,288 46,696 46,461 46,523 46,185

5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 155,965 163,369 163,512 163,583 163,369 162,868 162,511 164,298 162,153 165,013 163,369 163,798 161,438
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA
5.46 (LINEAL)
ML 95,329 99,058 99,130 99,166 99,058 98,808 98,629 99,523 98,451 99,881 99,058 99,273 98,093
5.47 REMATES LADRILLO PRENSADO ML 33,001 34,002 34,017 34,025 34,002 33,948 33,910 34,101 33,872 34,177 34,002 34,047 33,796
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 38,459 39,494 39,540 39,562 39,494 39,334 39,219 39,791 39,105 40,020 39,494 39,631 38,876
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 64,748 66,375 66,436 66,466 66,375 66,161 66,009 66,771 65,857 67,076 66,375 66,558 65,552
5.50 LAVADA DE FACHADA M2 5,539 5,559 5,559 5,559 5,559 5,559 5,559 5,559 5,559 5,559 5,559 5,559 5,559
5.51 PASAMANOS EN CONCRETO 2500 PSI ML 53,041 54,405 54,466 54,496 54,405 54,193 54,042 54,799 53,891 55,101 54,405 54,587 53,588
5.52 DOVELA, GROUTING 3000 PSI ML 11,147 11,185 11,185 11,185 11,185 11,185 11,185 11,185 11,185 11,185 11,185 11,185 11,185
5.53 ANCLAJE 3/8" L=30CM UN 14,627 14,746 14,746 14,746 14,746 14,746 14,746 14,746 14,746 14,746 14,746 14,746 14,746
5.54 ANCLAJE 1/2" L=50CM UN 19,082 19,259 19,259 19,259 19,259 19,259 19,259 19,259 19,259 19,259 19,259 19,259 19,259
5.55 ANCLAJE 5/8" L=70CM UN 26,540 26,901 26,901 26,901 26,901 26,901 26,901 26,901 26,901 26,901 26,901 26,901 26,901
5.56 ANCLAJE 3/4" L=70CM UN 39,344 40,035 40,035 40,035 40,035 40,035 40,035 40,035 40,035 40,035 40,035 40,035 40,035
5.57 ANCLAJE 1" L= 70CM UN 5,121 5,423 5,439 5,447 5,423 5,366 5,325 5,529 5,284 5,611 5,423 5,472 5,202

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 16,994 17,105 17,105 17,105 17,105 17,105 17,105 17,105 17,105 17,105 17,105 17,105 17,105
6.2 FILOS O DILATACIONES B/PLACA ML 6,019 6,461 6,476 6,484 6,461 6,408 6,369 6,560 6,331 6,636 6,461 6,507 6,255
6.3 FILOS O DILATACIONES S/MURO ML 7,276 7,718 7,733 7,741 7,718 7,665 7,626 7,817 7,588 7,893 7,718 7,764 7,512
6.4 GOTERA EN MORTERO 1:4 ML 8,594 9,067 9,083 9,090 9,067 9,014 8,976 9,166 8,938 9,243 9,067 9,113 8,862
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 7,072 7,223 7,223 7,223 7,223 7,223 7,223 7,223 7,223 7,223 7,223 7,223 7,223
6.6 MALLA BAJO ENTRAMADO M2 14,355 14,500 14,500 14,500 14,500 14,500 14,500 14,500 14,500 14,500 14,500 14,500 14,500
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 26,161 26,643 26,687 26,709 26,643 26,487 26,376 26,932 26,264 27,154 26,643 26,776 26,042
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 15,830 16,071 16,093 16,104 16,071 15,993 15,938 16,216 15,882 16,327 16,071 16,138 15,771
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 22,052 23,394 23,437 23,458 23,394 23,244 23,137 23,673 23,029 23,887 23,394 23,523 22,815
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 13,447 14,118 14,139 14,150 14,118 14,043 13,989 14,257 13,936 14,365 14,118 14,182 13,828
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 22,037 22,518 22,563 22,585 22,518 22,362 22,251 22,807 22,140 23,030 22,518 22,652 21,918
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 13,439 13,680 13,702 13,713 13,680 13,602 13,547 13,825 13,491 13,936 13,680 13,747 13,380
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 22,052 23,394 23,437 23,458 23,394 23,244 23,137 23,673 23,029 23,887 23,394 23,523 22,815
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 13,447 14,118 14,139 14,150 14,118 14,043 13,989 14,257 13,936 14,365 14,118 14,182 13,828
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 23,000 23,507 23,539 23,554 23,507 23,396 23,317 23,713 23,237 23,871 23,507 23,602 23,079

6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 13,920 14,173 14,189 14,197 14,173 14,118 14,078 14,276 14,038 14,355 14,173 14,221 13,959

6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 18,373 19,395 19,428 19,444 19,395 19,281 19,199 19,608 19,118 19,771 19,395 19,493 18,954
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 11,302 11,813 11,829 11,837 11,813 11,756 11,715 11,919 11,674 12,001 11,813 11,862 11,592
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 18,361 18,728 18,762 18,779 18,728 18,609 18,525 18,948 18,440 19,118 18,728 18,830 18,270
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 11,296 11,479 11,496 11,505 11,479 11,420 11,377 11,589 11,335 11,674 11,479 11,530 11,250
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 22,877 24,219 24,262 24,283 24,219 24,069 23,962 24,498 23,854 24,712 24,219 24,348 23,640
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 13,838 14,509 14,531 14,541 14,509 14,434 14,381 14,649 14,327 14,756 14,509 14,574 14,220
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 22,861 23,343 23,388 23,410 23,343 23,187 23,076 23,632 22,965 23,855 23,343 23,477 22,742
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 13,830 14,071 14,094 14,105 14,071 13,993 13,938 14,216 13,882 14,327 14,071 14,138 13,771
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 19,008 19,375 19,409 19,426 19,375 19,256 19,172 19,595 19,087 19,765 19,375 19,477 18,917
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 11,600 11,784 11,801 11,809 11,784 11,724 11,682 11,894 11,640 11,979 11,784 11,835 11,555
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 23,804 24,286 24,330 24,353 24,286 24,130 24,019 24,575 23,908 24,798 24,286 24,419 23,685
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 14,730 14,971 14,993 15,005 14,971 14,893 14,838 15,116 14,782 15,227 14,971 15,038 14,671

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 27,968 29,885 29,946 29,977 29,885 29,670 29,517 30,283 29,364 30,590 29,885 30,069 29,058
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN
7.2 ASFALTO (INCLUYE TELA IMPERMEABLE)
M2 85,819 89,321 89,434 89,491 89,321 88,925 88,642 90,057 88,359 90,623 89,321 89,661 87,793
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 56,914 58,417 58,417 58,417 58,417 58,417 58,417 58,417 58,417 58,417 58,417 58,417 58,417
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 22,924 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 35,909 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 82,954 85,265 85,265 85,265 85,265 85,265 85,265 85,265 85,265 85,265 85,265 85,265 85,265
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 65,111 66,838 66,838 66,838 66,838 66,838 66,838 66,838 66,838 66,838 66,838 66,838 66,838
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 38,163 39,008 39,008 39,008 39,008 39,008 39,008 39,008 39,008 39,008 39,008 39,008 39,008
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 86,903 89,343 89,343 89,343 89,343 89,343 89,343 89,343 89,343 89,343 89,343 89,343 89,343
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 103,635 106,623 106,623 106,623 106,623 106,623 106,623 106,623 106,623 106,623 106,623 106,623 106,623
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 151,972 156,542 156,542 156,542 156,542 156,542 156,542 156,542 156,542 156,542 156,542 156,542 156,542
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 60,564 62,080 62,080 62,080 62,080 62,080 62,080 62,080 62,080 62,080 62,080 62,080 62,080
7.13 CANAL PVC AMAZONAS ML 84,440 86,394 86,394 86,394 86,394 86,394 86,394 86,394 86,394 86,394 86,394 86,394 86,394
7.14 CANAL PVC RAINGO ML 76,893 78,600 78,600 78,600 78,600 78,600 78,600 78,600 78,600 78,600 78,600 78,600 78,600
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 135,235 138,942 138,942 138,942 138,942 138,942 138,942 138,942 138,942 138,942 138,942 138,942 138,942
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 78,813 81,069 81,069 81,069 81,069 81,069 81,069 81,069 81,069 81,069 81,069 81,069 81,069
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 58,046 59,622 59,622 59,622 59,622 59,622 59,622 59,622 59,622 59,622 59,622 59,622 59,622
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 33,649 34,232 34,232 34,232 34,232 34,232 34,232 34,232 34,232 34,232 34,232 34,232 34,232
7.19 TEJA DE BARRO M2 61,611 64,645 64,721 64,759 64,645 64,378 64,187 65,140 63,997 65,521 64,645 64,873 63,616
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 48,369 49,694 49,694 49,694 49,694 49,694 49,694 49,694 49,694 49,694 49,694 49,694 49,694
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 44,381 45,574 45,574 45,574 45,574 45,574 45,574 45,574 45,574 45,574 45,574 45,574 45,574
7.22 TEJA FIBROCEMENTO Nº4 M2 37,870 38,647 38,647 38,647 38,647 38,647 38,647 38,647 38,647 38,647 38,647 38,647 38,647
7.23 TEJA FIBROCEMENTO No. 6 M2 37,043 37,823 37,823 37,823 37,823 37,823 37,823 37,823 37,823 37,823 37,823 37,823 37,823
7.24 TEJA FIBROCEMENTO No. 8 M2 37,317 38,106 38,106 38,106 38,106 38,106 38,106 38,106 38,106 38,106 38,106 38,106 38,106
7.25 TEJA TERMOACÚSTICA M2 52,162 53,464 53,464 53,464 53,464 53,464 53,464 53,464 53,464 53,464 53,464 53,464 53,464
7.26 TEJA PLÁSTICA No.6 M2 45,947 47,046 47,046 47,046 47,046 47,046 47,046 47,046 47,046 47,046 47,046 47,046 47,046
7.27 TEJA ESPAÑOLA ETERNIT M2 83,594 85,867 85,867 85,867 85,867 85,867 85,867 85,867 85,867 85,867 85,867 85,867 85,867
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7.28 30MM
M2 153,732 158,260 158,260 158,260 158,260 158,260 158,260 158,260 158,260 158,260 158,260 158,260 158,260
7.29 TEJA SIN TRASLAPO M2 69,345 71,257 71,257 71,257 71,257 71,257 71,257 71,257 71,257 71,257 71,257 71,257 71,257
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 44,507 45,154 45,154 45,154 45,154 45,154 45,154 45,154 45,154 45,154 45,154 45,154 45,154
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 34,707 35,303 35,303 35,303 35,303 35,303 35,303 35,303 35,303 35,303 35,303 35,303 35,303
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM)
M2 59,818 61,236 61,236 61,236 61,236 61,236 61,236 61,236 61,236 61,236 61,236 61,236 61,236
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 20,973 21,251 21,251 21,251 21,251 21,251 21,251 21,251 21,251 21,251 21,251 21,251 21,251
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 25,087 25,499 25,499 25,499 25,499 25,499 25,499 25,499 25,499 25,499 25,499 25,499 25,499
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 27,074 27,578 27,578 27,578 27,578 27,578 27,578 27,578 27,578 27,578 27,578 27,578 27,578
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 34,667 35,420 35,420 35,420 35,420 35,420 35,420 35,420 35,420 35,420 35,420 35,420 35,420
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 23,063 23,465 23,465 23,465 23,465 23,465 23,465 23,465 23,465 23,465 23,465 23,465 23,465
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 54,203 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 362,902 374,351 374,351 374,351 374,351 374,351 374,351 374,351 374,351 374,351 374,351 374,351 374,351
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 425,979 431,975 431,975 431,975 431,975 431,975 431,975 431,975 431,975 431,975 431,975 431,975 431,975
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 278,336 285,628 285,628 285,628 285,628 285,628 285,628 285,628 285,628 285,628 285,628 285,628 285,628
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 296,638 304,852 304,852 304,852 304,852 304,852 304,852 304,852 304,852 304,852 304,852 304,852 304,852

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 466,570 509,336 511,663 512,826 509,336 501,189 495,370 524,464 489,552 536,102 509,336 516,318 477,914
8.2 CONCRETO 3500 PSI M3 406,600 445,936 448,067 449,132 445,936 438,477 433,150 459,787 427,822 470,442 445,936 452,329 417,167
8.3 CONCRETO 3000 PSI M3 403,814 444,212 446,400 447,494 444,212 436,553 431,083 458,434 425,613 469,375 444,212 450,776 414,673
8.4 CONCRETO 2500 PSI M3 361,433 400,019 402,284 403,415 400,019 392,093 386,431 414,739 380,770 426,062 400,019 406,812 369,447
8.5 CONCRETO 2000 PSI M3 335,850 375,335 377,636 378,786 375,335 367,279 361,525 390,295 355,771 401,802 375,335 382,239 344,263
8.6 CONCRETO 1500 PSI M3 303,089 343,673 346,007 347,174 343,673 335,501 329,665 358,848 323,828 370,521 343,673 350,676 312,155
8.7 MORTERO SECO 1:10 M3 243,341 303,704 305,807 306,859 303,704 296,342 291,083 317,377 285,824 327,894 303,704 310,015 275,307
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 460,894 524,792 526,834 527,855 524,792 517,643 512,536 538,069 507,429 548,281 524,792 530,920 497,217
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 460,147 483,082 485,200 486,259 483,082 475,666 470,369 496,854 465,071 507,447 483,082 489,438 454,478
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 520,221 544,362 546,343 547,334 544,362 537,427 532,472 557,243 527,518 567,150 544,362 550,307 517,611
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 750,101 781,762 783,743 784,734 781,762 774,827 769,872 794,643 764,918 804,550 781,762 787,707 755,011

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML 127,072 130,121 130,121 130,121 130,121 130,121 130,121 130,121 130,121 130,121 130,121 130,121 130,121
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 4,102 4,573 4,588 4,596 4,573 4,520 4,482 4,672 4,444 4,749 4,573 4,619 4,367
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 142,724 145,841 145,841 145,841 145,841 145,841 145,841 145,841 145,841 145,841 145,841 145,841 145,841
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 174,192 178,340 178,340 178,340 178,340 178,340 178,340 178,340 178,340 178,340 178,340 178,340 178,340
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 250,946 258,235 258,235 258,235 258,235 258,235 258,235 258,235 258,235 258,235 258,235 258,235 258,235
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 279,170 287,362 287,362 287,362 287,362 287,362 287,362 287,362 287,362 287,362 287,362 287,362 287,362
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 307,429 316,522 316,522 316,522 316,522 316,522 316,522 316,522 316,522 316,522 316,522 316,522 316,522
9.8 HOJA PUERTA FORTEC 0.81 UN 203,840 210,061 210,061 210,061 210,061 210,061 210,061 210,061 210,061 210,061 210,061 210,061 210,061
9.9 HOJA PUERTA FORTEC 0.91 UN 230,987 238,096 238,096 238,096 238,096 238,096 238,096 238,096 238,096 238,096 238,096 238,096 238,096
9.10 HOJA PUERTA FORTEC 1.50 UN 339,574 350,238 350,238 350,238 350,238 350,238 350,238 350,238 350,238 350,238 350,238 350,238 350,238
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 129,187 132,964 132,964 132,964 132,964 132,964 132,964 132,964 132,964 132,964 132,964 132,964 132,964
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 171,264 176,419 176,419 176,419 176,419 176,419 176,419 176,419 176,419 176,419 176,419 176,419 176,419
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 190,267 196,043 196,043 196,043 196,043 196,043 196,043 196,043 196,043 196,043 196,043 196,043 196,043
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 483,450 498,825 498,825 498,825 498,825 498,825 498,825 498,825 498,825 498,825 498,825 498,825 498,825
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 43,598 44,539 44,539 44,539 44,539 44,539 44,539 44,539 44,539 44,539 44,539 44,539 44,539
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 27,465 27,878 27,878 27,878 27,878 27,878 27,878 27,878 27,878 27,878 27,878 27,878 27,878
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 103,125 105,322 105,322 105,322 105,322 105,322 105,322 105,322 105,322 105,322 105,322 105,322 105,322
9.18 CERRADURA DE ENTRADA PRINCIPAL UN 123,875 127,695 127,695 127,695 127,695 127,695 127,695 127,695 127,695 127,695 127,695 127,695 127,695
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 96,321 99,239 99,239 99,239 99,239 99,239 99,239 99,239 99,239 99,239 99,239 99,239 99,239
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 30,138 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889

9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 30,138 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889 30,889

9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 28,591 29,291 29,291 29,291 29,291 29,291 29,291 29,291 29,291 29,291 29,291 29,291 29,291
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 43,838 44,848 44,848 44,848 44,848 44,848 44,848 44,848 44,848 44,848 44,848 44,848 44,848
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 54,119 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 65,087 66,792 66,792 66,792 66,792 66,792 66,792 66,792 66,792 66,792 66,792 66,792 66,792
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 78,110 80,242 80,242 80,242 80,242 80,242 80,242 80,242 80,242 80,242 80,242 80,242 80,242
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 365,822 377,043 377,043 377,043 377,043 377,043 377,043 377,043 377,043 377,043 377,043 377,043 377,043
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 256,151 263,780 263,780 263,780 263,780 263,780 263,780 263,780 263,780 263,780 263,780 263,780 263,780
9.29 VIDRIO TRANSPARENTE 3 MM M2 34,926 35,644 35,644 35,644 35,644 35,644 35,644 35,644 35,644 35,644 35,644 35,644 35,644
9.30 VIDRIO TRANSPARENTE 4 MM M2 44,523 45,556 45,556 45,556 45,556 45,556 45,556 45,556 45,556 45,556 45,556 45,556 45,556
9.31 VIDRIO TRANSPARENTE 5 MM M2 54,119 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466 55,466
9.32 VIDRIO TRANSPARENTE 6 MM M2 67,828 69,624 69,624 69,624 69,624 69,624 69,624 69,624 69,624 69,624 69,624 69,624 69,624

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN 78,641 80,438 80,438 80,438 80,438 80,438 80,438 80,438 80,438 80,438 80,438 80,438 80,438
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 216,498 222,808 222,808 222,808 222,808 222,808 222,808 222,808 222,808 222,808 222,808 222,808 222,808
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO
10.3 DE 1" (INCLUYE ANTICORROSIVO) ML 83,609 85,306 85,306 85,306 85,306 85,306 85,306 85,306 85,306 85,306 85,306 85,306 85,306
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 150,841 153,187 153,187 153,187 153,187 153,187 153,187 153,187 153,187 153,187 153,187 153,187 153,187
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN 141,404 144,476 144,476 144,476 144,476 144,476 144,476 144,476 144,476 144,476 144,476 144,476 144,476
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 92,862 94,865 94,865 94,865 94,865 94,865 94,865 94,865 94,865 94,865 94,865 94,865 94,865
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 218,202 223,300 223,300 223,300 223,300 223,300 223,300 223,300 223,300 223,300 223,300 223,300 223,300
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 114,040 116,478 116,478 116,478 116,478 116,478 116,478 116,478 116,478 116,478 116,478 116,478 116,478

10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 6,864 6,998 6,998 6,998 6,998 6,998 6,998 6,998 6,998 6,998 6,998 6,998 6,998

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO


10.10 (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")
M2 104,267 105,736 105,736 105,736 105,736 105,736 105,736 105,736 105,736 105,736 105,736 105,736 105,736

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA


10,10(1) CLASICA) H: 2.00 MTS
M2 124,709 127,782 127,782 127,782 127,782 127,782 127,782 127,782 127,782 127,782 127,782 127,782 127,782
CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC.
10.11 ANTICORROSIVO
ML 42,894 43,518 43,518 43,518 43,518 43,518 43,518 43,518 43,518 43,518 43,518 43,518 43,518
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10.12 E=6MM M2 551,107 567,735 567,735 567,735 567,735 567,735 567,735 567,735 567,735 567,735 567,735 567,735 567,735
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 198,955 204,496 204,496 204,496 204,496 204,496 204,496 204,496 204,496 204,496 204,496 204,496 204,496

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA


10.14 ELECTROSTÁTICA
M2 224,661 230,075 230,075 230,075 230,075 230,075 230,075 230,075 230,075 230,075 230,075 230,075 230,075

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20


10.15 (INCLUYE PUERTAS Y ACCESORIOS) M2 503,352 518,016 518,016 518,016 518,016 518,016 518,016 518,016 518,016 518,016 518,016 518,016 518,016

REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.


10.16 ANTICORROSIVO
M2 134,103 136,270 136,270 136,270 136,270 136,270 136,270 136,270 136,270 136,270 136,270 136,270 136,270

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 401,493 413,858 413,858 413,858 413,858 413,858 413,858 413,858 413,858 413,858 413,858 413,858 413,858
SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC.
10.18 ANTICORROSIVO
ML 6,262 6,389 6,389 6,389 6,389 6,389 6,389 6,389 6,389 6,389 6,389 6,389 6,389
10.19 VENTANA EN ALUMINIO CORREDIZA M2 283,279 291,442 291,442 291,442 291,442 291,442 291,442 291,442 291,442 291,442 291,442 291,442 291,442
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 127,382 129,609 129,609 129,609 129,609 129,609 129,609 129,609 129,609 129,609 129,609 129,609 129,609
10.21 REJILLA PISO 0.30 M M2 89,029 91,128 91,128 91,128 91,128 91,128 91,128 91,128 91,128 91,128 91,128 91,128 91,128
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 92,115 94,159 94,159 94,159 94,159 94,159 94,159 94,159 94,159 94,159 94,159 94,159 94,159

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:


CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG 10,994 11,162 11,162 11,162 11,162 11,162 11,162 11,162 11,162 11,162 11,162 11,162 11,162
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO


C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS
10.24 ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG 12,170 12,377 12,377 12,377 12,377 12,377 12,377 12,377 12,377 12,377 12,377 12,377 12,377
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN,
SUMINISTRO, MONTAJE
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR),


PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS,
10.25 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, KG 9,727 9,853 9,853 9,853 9,853 9,853 9,853 9,853 9,853 9,853 9,853 9,853 9,853
TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11.1 ACOMETIDA EN PVC 1/2" 5M UN 230,720 234,528 234,528 234,528 234,528 234,528 234,528 234,528 234,528 234,528 234,528 234,528 234,528
11.2 ACOMETIDA EN PVC 3/4" 5M UN 277,035 282,363 282,363 282,363 282,363 282,363 282,363 282,363 282,363 282,363 282,363 282,363 282,363
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 22,924 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389 23,389
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 35,909 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689 36,689
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 34,593 35,257 35,257 35,257 35,257 35,257 35,257 35,257 35,257 35,257 35,257 35,257 35,257
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 44,213 45,145 45,145 45,145 45,145 45,145 45,145 45,145 45,145 45,145 45,145 45,145 45,145
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 90,778 92,919 92,919 92,919 92,919 92,919 92,919 92,919 92,919 92,919 92,919 92,919 92,919
11.8 CONEXIÓN TANQUE ELEVADO PVC UN 232,103 235,957 235,957 235,957 235,957 235,957 235,957 235,957 235,957 235,957 235,957 235,957 235,957
11.9 INSTALACIÓN APARATO SANITARIO UN 46,896 46,934 46,934 46,934 46,934 46,934 46,934 46,934 46,934 46,934 46,934 46,934 46,934
11.10 INSTALACIÓN BOMBAS AGUA UN 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN 36,632 37,207 37,207 37,207 37,207 37,207 37,207 37,207 37,207 37,207 37,207 37,207 37,207
11.13 NIPLE PASAMURO 2" UN 70,164 70,964 70,964 70,964 70,964 70,964 70,964 70,964 70,964 70,964 70,964 70,964 70,964
11.14 NIPLE PASAMURO 4" UN 104,694 105,982 105,982 105,982 105,982 105,982 105,982 105,982 105,982 105,982 105,982 105,982 105,982
11.15 PUNTO AGUA CALIENTE CPVC UN 87,871 89,254 89,254 89,254 89,254 89,254 89,254 89,254 89,254 89,254 89,254 89,254 89,254
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 64,746 65,367 65,367 65,367 65,367 65,367 65,367 65,367 65,367 65,367 65,367 65,367 65,367
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 68,718 69,471 69,471 69,471 69,471 69,471 69,471 69,471 69,471 69,471 69,471 69,471 69,471
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 86,802 87,773 87,773 87,773 87,773 87,773 87,773 87,773 87,773 87,773 87,773 87,773 87,773
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 69,546 70,574 70,574 70,574 70,574 70,574 70,574 70,574 70,574 70,574 70,574 70,574 70,574
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 86,503 88,087 88,087 88,087 88,087 88,087 88,087 88,087 88,087 88,087 88,087 88,087 88,087
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 92,379 94,155 94,155 94,155 94,155 94,155 94,155 94,155 94,155 94,155 94,155 94,155 94,155
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 75,994 77,800 77,800 77,800 77,800 77,800 77,800 77,800 77,800 77,800 77,800 77,800 77,800
11.23 RED SUMINISTRO CPVC 1/2" ML 12,934 13,208 13,208 13,208 13,208 13,208 13,208 13,208 13,208 13,208 13,208 13,208 13,208
11.24 RED SUMINISTRO CPVC 3/4" ML 18,110 18,554 18,554 18,554 18,554 18,554 18,554 18,554 18,554 18,554 18,554 18,554 18,554
11.25 RED SUMINISTRO PVC 1 1/2" ML 23,665 24,233 24,233 24,233 24,233 24,233 24,233 24,233 24,233 24,233 24,233 24,233 24,233
11.26 RED SUMINISTRO PVC 1" ML 14,681 14,995 14,995 14,995 14,995 14,995 14,995 14,995 14,995 14,995 14,995 14,995 14,995
11.27 RED SUMINISTRO PVC 1/2" ML 8,812 8,976 8,976 8,976 8,976 8,976 8,976 8,976 8,976 8,976 8,976 8,976 8,976
11.28 RED SUMINISTRO PVC 2 1/2" ML 52,467 53,873 53,873 53,873 53,873 53,873 53,873 53,873 53,873 53,873 53,873 53,873 53,873
11.29 RED SUMINISTRO PVC 2" ML 33,645 34,496 34,496 34,496 34,496 34,496 34,496 34,496 34,496 34,496 34,496 34,496 34,496
11.30 RED SUMINISTRO PVC 3/4" ML 11,006 11,228 11,228 11,228 11,228 11,228 11,228 11,228 11,228 11,228 11,228 11,228 11,228
11.31 RED SANITARIA PVC-S 2" ML 26,083 26,687 26,687 26,687 26,687 26,687 26,687 26,687 26,687 26,687 26,687 26,687 26,687
11.32 RED SANITARIA PVC-S 3" ML 36,110 36,992 36,992 36,992 36,992 36,992 36,992 36,992 36,992 36,992 36,992 36,992 36,992
11.33 RED SANITARIA PVC-S 4" ML 48,950 50,178 50,178 50,178 50,178 50,178 50,178 50,178 50,178 50,178 50,178 50,178 50,178
11.34 RED SANITARIA PVC-S 6" ML 90,966 93,571 93,571 93,571 93,571 93,571 93,571 93,571 93,571 93,571 93,571 93,571 93,571
11.35 REGISTRO 1" UN 110,957 113,841 113,841 113,841 113,841 113,841 113,841 113,841 113,841 113,841 113,841 113,841 113,841
11.36 REGISTRO 1/2" UN 61,939 63,498 63,498 63,498 63,498 63,498 63,498 63,498 63,498 63,498 63,498 63,498 63,498
11.37 REGISTRO 3/4" UN 78,661 80,769 80,769 80,769 80,769 80,769 80,769 80,769 80,769 80,769 80,769 80,769 80,769
11.38 REGISTRO 1 1/2" UN 189,410 194,862 194,862 194,862 194,862 194,862 194,862 194,862 194,862 194,862 194,862 194,862 194,862
11.39 REGISTRO 2 1/2" UN 389,632 401,452 401,452 401,452 401,452 401,452 401,452 401,452 401,452 401,452 401,452 401,452 401,452
11.40 REGISTRO 2" UN 288,261 296,762 296,762 296,762 296,762 296,762 296,762 296,762 296,762 296,762 296,762 296,762 296,762
11.41 REVENTILACIÓN 2" ML 18,241 18,629 18,629 18,629 18,629 18,629 18,629 18,629 18,629 18,629 18,629 18,629 18,629
11.42 REVENTILACIÓN 3" ML 22,999 23,502 23,502 23,502 23,502 23,502 23,502 23,502 23,502 23,502 23,502 23,502 23,502
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN)
UN 178,782 182,763 182,763 182,763 182,763 182,763 182,763 182,763 182,763 182,763 182,763 182,763 182,763
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11.44 ISNTALACIÓN) UN 290,135 297,138 297,138 297,138 297,138 297,138 297,138 297,138 297,138 297,138 297,138 297,138 297,138
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11.45 INSTALACIÓN)
UN 482,166 494,208 494,208 494,208 494,208 494,208 494,208 494,208 494,208 494,208 494,208 494,208 494,208
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE
11.46 ACCESORIOS Y SOPORTES)
ML 41,553 42,596 42,596 42,596 42,596 42,596 42,596 42,596 42,596 42,596 42,596 42,596 42,596
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11.47 ACCESORIOS Y SOPORTES)
ML 48,985 50,238 50,238 50,238 50,238 50,238 50,238 50,238 50,238 50,238 50,238 50,238 50,238
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE
11.48 ACCESORIOS Y SOPORTES)
ML 63,141 64,526 64,526 64,526 64,526 64,526 64,526 64,526 64,526 64,526 64,526 64,526 64,526
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE
11.49 ACCESORIOS Y SOPORTES) ML 71,402 73,190 73,190 73,190 73,190 73,190 73,190 73,190 73,190 73,190 73,190 73,190 73,190
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11.50 ACCESORIOS Y SOPORTES) ML 91,986 94,328 94,328 94,328 94,328 94,328 94,328 94,328 94,328 94,328 94,328 94,328 94,328

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE


11.51 ACCESORIOS Y SOPORTES) ML 107,031 109,318 109,318 109,318 109,318 109,318 109,318 109,318 109,318 109,318 109,318 109,318 109,318

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE


11.52 ACCESORIOS Y SOPORTES)
ML 158,396 161,615 161,615 161,615 161,615 161,615 161,615 161,615 161,615 161,615 161,615 161,615 161,615

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 64,197 65,354 65,354 65,354 65,354 65,354 65,354 65,354 65,354 65,354 65,354 65,354 65,354
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 64,453 65,619 65,619 65,619 65,619 65,619 65,619 65,619 65,619 65,619 65,619 65,619 65,619
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 41,239 42,151 42,151 42,151 42,151 42,151 42,151 42,151 42,151 42,151 42,151 42,151 42,151
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 50,686 51,907 51,907 51,907 51,907 51,907 51,907 51,907 51,907 51,907 51,907 51,907 51,907
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE
11.57 HASTA 2" ML 4,269 4,384 4,384 4,384 4,384 4,384 4,384 4,384 4,384 4,384 4,384 4,384 4,384

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO


11.58 MAYOR A 2"
ML 6,715 6,910 6,910 6,910 6,910 6,910 6,910 6,910 6,910 6,910 6,910 6,910 6,910
11.59 GABINETE TIPO III UN 1,040,315 1,068,664 1,068,664 1,068,664 1,068,664 1,068,664 1,068,664 1,068,664 1,068,664 1,068,664 1,068,664 1,068,664 1,068,664
11.60 GABINETE TIPO I UN 796,267 816,627 816,627 816,627 816,627 816,627 816,627 816,627 816,627 816,627 816,627 816,627 816,627
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 2,662,778 2,745,185 2,745,185 2,745,185 2,745,185 2,745,185 2,745,185 2,745,185 2,745,185 2,745,185 2,745,185 2,745,185 2,745,185
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 2,221,288 2,289,241 2,289,241 2,289,241 2,289,241 2,289,241 2,289,241 2,289,241 2,289,241 2,289,241 2,289,241 2,289,241 2,289,241
11.63 VÁLVULA MARIPOSA 3" UN 649,804 666,298 666,298 666,298 666,298 666,298 666,298 666,298 666,298 666,298 666,298 666,298 666,298
11.64 VÁLVULA MARIPOSA 4" UN 838,744 861,424 861,424 861,424 861,424 861,424 861,424 861,424 861,424 861,424 861,424 861,424 861,424
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 320,741 330,844 330,844 330,844 330,844 330,844 330,844 330,844 330,844 330,844 330,844 330,844 330,844

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN 373,853 383,776 383,776 383,776 383,776 383,776 383,776 383,776 383,776 383,776 383,776 383,776 383,776
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 59,388 60,972 60,972 60,972 60,972 60,972 60,972 60,972 60,972 60,972 60,972 60,972 60,972
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 70,191 72,134 72,134 72,134 72,134 72,134 72,134 72,134 72,134 72,134 72,134 72,134 72,134
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 78,070 80,141 80,141 80,141 80,141 80,141 80,141 80,141 80,141 80,141 80,141 80,141 80,141
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 91,805 94,333 94,333 94,333 94,333 94,333 94,333 94,333 94,333 94,333 94,333 94,333 94,333
12.6 SALIDA TELÉFONO PVC COMPLETA UN 55,903 57,358 57,358 57,358 57,358 57,358 57,358 57,358 57,358 57,358 57,358 57,358 57,358
12.7 SALIDA TIMBRE PVC COMPLETA UN 63,672 65,357 65,357 65,357 65,357 65,357 65,357 65,357 65,357 65,357 65,357 65,357 65,357
12.8 STRIP TELEFÓNICO 10 PARES UN 147,681 151,173 151,173 151,173 151,173 151,173 151,173 151,173 151,173 151,173 151,173 151,173 151,173
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN 57,352 58,869 58,869 58,869 58,869 58,869 58,869 58,869 58,869 58,869 58,869 58,869 58,869
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 131,647 135,223 135,223 135,223 135,223 135,223 135,223 135,223 135,223 135,223 135,223 135,223 135,223
12.11 SALIDA T.V PVC COMPLETA. UN 78,847 80,918 80,918 80,918 80,918 80,918 80,918 80,918 80,918 80,918 80,918 80,918 80,918
12.12 SALIDA BIFÁSICA C.N. UN 46,742 47,977 47,977 47,977 47,977 47,977 47,977 47,977 47,977 47,977 47,977 47,977 47,977
12.13 TABLERO PARCIAL 4 CIRCUITOS UN 98,844 101,270 101,270 101,270 101,270 101,270 101,270 101,270 101,270 101,270 101,270 101,270 101,270
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 422,372 432,543 432,543 432,543 432,543 432,543 432,543 432,543 432,543 432,543 432,543 432,543 432,543

12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 561,903 575,842 575,842 575,842 575,842 575,842 575,842 575,842 575,842 575,842 575,842 575,842 575,842
12.16 TUBERÍA PVC CONDUIT 1/2" ML 3,636 3,727 3,727 3,727 3,727 3,727 3,727 3,727 3,727 3,727 3,727 3,727 3,727
12.17 TUBERÍA PVC CONDUIT 3/4" ML 4,804 4,923 4,923 4,923 4,923 4,923 4,923 4,923 4,923 4,923 4,923 4,923 4,923
12.18 TUBERÍA PVC CONDUIT 1" ML 7,465 7,656 7,656 7,656 7,656 7,656 7,656 7,656 7,656 7,656 7,656 7,656 7,656
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML 13,361 13,698 13,698 13,698 13,698 13,698 13,698 13,698 13,698 13,698 13,698 13,698 13,698
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta

12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 280,387 287,664 287,664 287,664 287,664 287,664 287,664 287,664 287,664 287,664 287,664 287,664 287,664

12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 79,454 81,381 81,381 81,381 81,381 81,381 81,381 81,381 81,381 81,381 81,381 81,381 81,381

12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 107,168 110,002 110,002 110,002 110,002 110,002 110,002 110,002 110,002 110,002 110,002 110,002 110,002
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 44,392 45,170 45,170 45,170 45,170 45,170 45,170 45,170 45,170 45,170 45,170 45,170 45,170
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,441,655 1,475,676 1,475,676 1,475,676 1,475,676 1,475,676 1,475,676 1,475,676 1,475,676 1,475,676 1,475,676 1,475,676 1,475,676
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1,068,405 1,093,400 1,093,400 1,093,400 1,093,400 1,093,400 1,093,400 1,093,400 1,093,400 1,093,400 1,093,400 1,093,400 1,093,400
12.26 POSTE METÁLICO 6M UN 1,324,449 1,362,486 1,362,486 1,362,486 1,362,486 1,362,486 1,362,486 1,362,486 1,362,486 1,362,486 1,362,486 1,362,486 1,362,486
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE
12.27 LUMINARIA)
UN 614,975 633,860 633,860 633,860 633,860 633,860 633,860 633,860 633,860 633,860 633,860 633,860 633,860
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 113,128 116,083 116,083 116,083 116,083 116,083 116,083 116,083 116,083 116,083 116,083 116,083 116,083
12.29 LUMINARIA 70W SODIO UN 515,713 531,703 531,703 531,703 531,703 531,703 531,703 531,703 531,703 531,703 531,703 531,703 531,703
12.30 LUMINARIA 150W SODIO UN 644,830 665,047 665,047 665,047 665,047 665,047 665,047 665,047 665,047 665,047 665,047 665,047 665,047
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,700,810 1,755,558 1,755,558 1,755,558 1,755,558 1,755,558 1,755,558 1,755,558 1,755,558 1,755,558 1,755,558 1,755,558 1,755,558
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1,252,894 1,292,974 1,292,974 1,292,974 1,292,974 1,292,974 1,292,974 1,292,974 1,292,974 1,292,974 1,292,974 1,292,974 1,292,974

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 42,515 43,742 43,819 43,857 43,742 43,476 43,285 44,238 43,095 44,619 43,742 43,971 42,714
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 41,923 43,328 43,404 43,442 43,328 43,061 42,871 43,823 42,680 44,204 43,328 43,557 42,299
13.3 ALISTADO PARA LISTÓN M2 15,702 15,972 15,988 15,995 15,972 15,919 15,881 16,071 15,843 16,148 15,972 16,018 15,767
13.4 ALISTADO PISOS 1:3, E=0.04 M2 31,421 32,925 33,078 33,154 32,925 32,392 32,011 33,916 31,629 34,678 32,925 33,382 30,867
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 89,807 93,057 93,209 93,285 93,057 92,523 92,142 94,047 91,761 94,809 93,057 93,514 90,999
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 28,127 28,969 29,015 29,038 28,969 28,808 28,693 29,269 28,578 29,499 28,969 29,108 28,348
13.7 CONCRETO BASE GRADAS 2500 PSI M2 60,164 64,096 64,322 64,435 64,096 63,303 62,737 65,568 62,171 66,700 64,096 64,775 61,038
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 83,096 89,384 89,746 89,927 89,384 88,116 87,210 91,739 86,304 93,551 89,384 90,471 84,493
13.9 MANTO FIBERGLASS 600X1 M2 31,456 32,191 32,191 32,191 32,191 32,191 32,191 32,191 32,191 32,191 32,191 32,191 32,191
13.10 PEGANTE MORTERO-CONCRETO M2 24,074 24,457 24,457 24,457 24,457 24,457 24,457 24,457 24,457 24,457 24,457 24,457 24,457
13.11 PERMA PLY 2 CAPAS M2 28,347 28,740 28,740 28,740 28,740 28,740 28,740 28,740 28,740 28,740 28,740 28,740 28,740
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 48,879 52,389 52,593 52,694 52,389 51,675 51,166 53,714 50,656 54,733 52,389 53,000 49,637
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 57,212 61,493 61,742 61,867 61,493 60,621 59,999 63,113 59,376 64,358 61,493 62,241 58,130
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 82,742 89,375 89,760 89,952 89,375 88,027 87,065 91,877 86,102 93,802 89,375 90,530 84,178
13.15 TRITURADO FINO 1/2 M3 93,151 122,444 124,014 124,799 122,444 116,950 113,026 132,647 109,101 140,496 122,444 127,153 101,253
13.16 TRITURADO GRUESO 3/4 M3 99,768 128,055 131,386 126,882 123,677 119,381 112,048 126,822 108,695 140,294 123,279 128,894 96,020

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS

14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 60,000 61,435 61,465 61,480 61,435 61,328 61,252 61,633 61,176 61,785 61,435 61,526 61,023

BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA


14.2 (LINEAL)
ML 36,011 36,729 36,744 36,752 36,729 36,676 36,638 36,828 36,599 36,904 36,729 36,775 36,523

14.3 ADOQUÍN CONCRETO 6CM M2 69,248 71,096 71,172 71,211 71,096 70,830 70,639 71,592 70,448 71,973 71,096 71,325 70,067
14.4 ADOQUÍN CONCRETO 8CM M2 72,648 74,596 74,672 74,711 74,596 74,330 74,139 75,092 73,948 75,473 74,596 74,825 73,567
14.5 ADOQUÍN GRES PEATONAL M2 77,057 79,132 79,208 79,246 79,132 78,865 78,675 79,627 78,484 80,008 79,132 79,360 78,103
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE
14.6 FONDO BLANCO. INCLUYE ALISTADO
M2 78,555 80,637 80,668 80,683 80,637 80,531 80,454 80,835 80,378 80,988 80,637 80,729 80,226
14.7 GRAVILLA PARA GRADAS ML 40,048 40,296 40,325 40,339 40,296 40,193 40,120 40,486 40,047 40,632 40,296 40,383 39,901
ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y
14.8 PULIDA)
M2 171,763 176,885 177,022 177,091 176,885 176,405 176,062 177,777 175,719 178,463 176,885 177,297 175,033
14.9 ACABADO EN GRAVILLA LAVADA M2 50,174 50,832 50,906 50,943 50,832 50,574 50,390 51,311 50,206 51,679 50,832 51,053 49,837
14.10 GUARDAESCOBA EN GRANITO ML 46,309 46,852 46,852 46,852 46,852 46,852 46,852 46,852 46,852 46,852 46,852 46,852 46,852
14.11 GUARDAESCOBA EN GRAVILLA ML 11,157 11,343 11,373 11,387 11,343 11,241 11,168 11,533 11,095 11,679 11,343 11,431 10,949
14.12 GUARDAESCOBA PVC CARAMELO ML 9,677 9,949 9,949 9,949 9,949 9,949 9,949 9,949 9,949 9,949 9,949 9,949 9,949
14.13 GUARDAESCOBA PVC CEDRO ML 12,965 13,345 13,345 13,345 13,345 13,345 13,345 13,345 13,345 13,345 13,345 13,345 13,345
14.14 GUARDAESCOBA PINO CARIBE ML 11,025 11,223 11,223 11,223 11,223 11,223 11,223 11,223 11,223 11,223 11,223 11,223 11,223
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
14.15 GUARDAESCOBA CEDRO BLANCO ML 18,293 18,729 18,729 18,729 18,729 18,729 18,729 18,729 18,729 18,729 18,729 18,729 18,729
14.16 GUARDAESCOBA EN MADERA SAPAN ML 35,396 36,391 36,391 36,391 36,391 36,391 36,391 36,391 36,391 36,391 36,391 36,391 36,391
14.17 GUARDAESCOBA GRES Y CERÁMICA ML 9,830 9,893 9,893 9,893 9,893 9,893 9,893 9,893 9,893 9,893 9,893 9,893 9,893
14.18 LISTÓN M.H. AMARILLO M2 77,648 79,219 79,219 79,219 79,219 79,219 79,219 79,219 79,219 79,219 79,219 79,219 79,219
14.19 PASO ESCALERA GRANITO ML 125,735 128,608 128,715 128,769 128,608 128,235 127,968 129,302 127,702 129,836 128,608 128,929 127,168
14.20 PIRLANES ALUMINIO ML 8,084 8,106 8,106 8,106 8,106 8,106 8,106 8,106 8,106 8,106 8,106 8,106 8,106
14.21 PIRLANES LADRILLO ML 33,760 34,961 34,992 35,007 34,961 34,854 34,778 35,159 34,702 35,312 34,961 35,053 34,549
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 47,550 48,750 48,750 48,750 48,750 48,750 48,750 48,750 48,750 48,750 48,750 48,750 48,750
14.23 PISO VINILO TRÁFICO PESADO M2 55,139 56,605 56,605 56,605 56,605 56,605 56,605 56,605 56,605 56,605 56,605 56,605 56,605
14.24 PULIDA LACADA PISO MADERA M2 51,549 52,454 52,454 52,454 52,454 52,454 52,454 52,454 52,454 52,454 52,454 52,454 52,454
14.25 TABLETA DE GRES 25X25 M2 52,189 53,408 53,439 53,454 53,408 53,301 53,225 53,606 53,149 53,759 53,408 53,499 52,996
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 58,395 59,819 59,849 59,864 59,819 59,712 59,636 60,017 59,560 60,169 59,819 59,910 59,407
GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO
14.27 BLANCO
ML 11,598 11,718 11,718 11,718 11,718 11,718 11,718 11,718 11,718 11,718 11,718 11,718 11,718
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 51,667 53,875 53,921 53,944 53,875 53,715 53,601 54,173 53,487 54,401 53,875 54,013 53,258
14.29 JABONERA PORCELANA ACUARIO UN 21,400 21,915 21,915 21,915 21,915 21,915 21,915 21,915 21,915 21,915 21,915 21,915 21,915
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE)
UN 127,593 130,959 130,959 130,959 130,959 130,959 130,959 130,959 130,959 130,959 130,959 130,959 130,959
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 10,554 10,657 10,657 10,657 10,657 10,657 10,657 10,657 10,657 10,657 10,657 10,657 10,657
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 23,424 23,948 23,948 23,948 23,948 23,948 23,948 23,948 23,948 23,948 23,948 23,948 23,948
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 15,169 15,423 15,423 15,423 15,423 15,423 15,423 15,423 15,423 15,423 15,423 15,423 15,423
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 14,748 14,988 14,988 14,988 14,988 14,988 14,988 14,988 14,988 14,988 14,988 14,988 14,988
14.35 REMATES BOCEL ALUMINIO ML 9,104 9,171 9,171 9,171 9,171 9,171 9,171 9,171 9,171 9,171 9,171 9,171 9,171
14.36 REMATES BOCEL PORCELANA ML 9,258 9,329 9,329 9,329 9,329 9,329 9,329 9,329 9,329 9,329 9,329 9,329 9,329
14.37 TAPA REGISTRO 20X20 UN 19,906 20,314 20,314 20,314 20,314 20,314 20,314 20,314 20,314 20,314 20,314 20,314 20,314
14.38 TAPA REGISTRO 6X6 UN 18,175 18,527 18,527 18,527 18,527 18,527 18,527 18,527 18,527 18,527 18,527 18,527 18,527
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE
14.39 MÁRMOL N.5
M2 19,138 19,765 19,765 19,765 19,765 19,765 19,765 19,765 19,765 19,765 19,765 19,765 19,765
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE
14.40 MÁRMOL FUNDIDO EN SITIO
M2 22,124 22,849 22,849 22,849 22,849 22,849 22,849 22,849 22,849 22,849 22,849 22,849 22,849

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 68,139 69,989 70,019 70,034 69,989 69,882 69,806 70,187 69,730 70,339 69,989 70,080 69,577
14.42 MEDIA CAÑA EN GRANITO ML 79,779 82,131 82,131 82,131 82,131 82,131 82,131 82,131 82,131 82,131 82,131 82,131 82,131
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 36,561 36,678 36,678 36,678 36,678 36,678 36,678 36,678 36,678 36,678 36,678 36,678 36,678
14.44 PINTURA ACRÍLICA PARA PISOS M2 13,881 14,147 14,147 14,147 14,147 14,147 14,147 14,147 14,147 14,147 14,147 14,147 14,147
PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS
14.45 DEPORTIVOS M2 104,380 107,716 107,716 107,716 107,716 107,716 107,716 107,716 107,716 107,716 107,716 107,716 107,716

14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 126,690 130,517 130,517 130,517 130,517 130,517 130,517 130,517 130,517 130,517 130,517 130,517 130,517

15 CIELO RASO
15.1 APLIQUE YESO ML 75,011 77,189 77,189 77,189 77,189 77,189 77,189 77,189 77,189 77,189 77,189 77,189 77,189
15.2 ARMADURA MADERA Y MALLA M2 38,137 38,495 38,495 38,495 38,495 38,495 38,495 38,495 38,495 38,495 38,495 38,495 38,495
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 57,969 59,077 59,077 59,077 59,077 59,077 59,077 59,077 59,077 59,077 59,077 59,077 59,077
15.4 CIELO RASO DURACUSTIC M2 70,851 72,381 72,381 72,381 72,381 72,381 72,381 72,381 72,381 72,381 72,381 72,381 72,381
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 52,991 54,066 54,066 54,066 54,066 54,066 54,066 54,066 54,066 54,066 54,066 54,066 54,066
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 97,742 100,056 100,056 100,056 100,056 100,056 100,056 100,056 100,056 100,056 100,056 100,056 100,056
15.7 CORNISAS YESO ML 50,274 51,781 51,781 51,781 51,781 51,781 51,781 51,781 51,781 51,781 51,781 51,781 51,781
LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE
15.8 APOYO)
M2 107,768 110,487 110,487 110,487 110,487 110,487 110,487 110,487 110,487 110,487 110,487 110,487 110,487
15.9 MALLA CON VENA M2 14,257 14,400 14,400 14,400 14,400 14,400 14,400 14,400 14,400 14,400 14,400 14,400 14,400

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE


16.2 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M
16.4 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE M3 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941
5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M


16.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE M3 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599
5 KM)

EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN


16.6 EXPLOSIVOS)
M3 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578

RELLENO CON MATERIAL DEL SITIO COMPACTADO


16.7 MECÁNICAMENTE
M3 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990

16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 87,039 107,921 116,709 93,860 88,588 90,345 72,769 63,981 72,769 93,860 86,830 93,860 46,405

16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 114,658 121,562 123,100 123,869 121,562 116,182 112,339 131,556 108,494 139,243 121,562 126,175 100,808

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO


16.10 MECÁNICAMENTE
M3 174,589 190,172 198,960 179,627 174,354 169,081 151,505 170,839 160,293 190,172 172,596 197,203 125,141

16.11 AFRIMADO (NORMA INVIAS 311) M3 78,036 96,711 101,984 80,892 79,135 73,862 70,347 84,408 63,316 109,014 77,377 75,620 43,983
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 164,310 151,342 158,373 139,039 135,524 130,251 112,675 132,009 121,463 151,342 133,766 158,373 86,311
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 171,023 186,606 195,394 176,061 170,788 165,515 147,939 167,273 156,727 186,606 169,030 193,637 121,575

17 APARATOS SANITARIOS
SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE
17.1 GRIFERÍA)
UN 311,575 320,278 320,278 320,278 320,278 320,278 320,278 320,278 320,278 320,278 320,278 320,278 320,278
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO
17.2 (INCLUYE GRIFERÍA)
UN 914,074 942,335 942,335 942,335 942,335 942,335 942,335 942,335 942,335 942,335 942,335 942,335 942,335
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE
17.3 GRIFERÍA)
UN 496,230 510,978 510,978 510,978 510,978 510,978 510,978 510,978 510,978 510,978 510,978 510,978 510,978
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE
17.4 GRIFERÍA) UN 145,826 148,937 148,937 148,937 148,937 148,937 148,937 148,937 148,937 148,937 148,937 148,937 148,937
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE
17.5 GRIFERÍA) UN 202,853 207,997 207,997 207,997 207,997 207,997 207,997 207,997 207,997 207,997 207,997 207,997 207,997
SUMINISTRO E INSTALACIÓN LAVAMANOS DE
17.6 EMPOTRAR(INCLUYE GRIFERÍA)
UN 188,561 193,237 193,237 193,237 193,237 193,237 193,237 193,237 193,237 193,237 193,237 193,237 193,237
SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE
17.7 GRIFERÍA)
UN 412,211 424,209 424,209 424,209 424,209 424,209 424,209 424,209 424,209 424,209 424,209 424,209 424,209
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO
17.8 (INCLUYE GRIFERÍA)
UN 1,050,812 1,083,550 1,083,550 1,083,550 1,083,550 1,083,550 1,083,550 1,083,550 1,083,550 1,083,550 1,083,550 1,083,550 1,083,550
SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE
17.9 GRIFERÍA) UN 300,096 308,423 308,423 308,423 308,423 308,423 308,423 308,423 308,423 308,423 308,423 308,423 308,423
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA
17.10 A BAÑERA
UN 213,557 218,885 218,885 218,885 218,885 218,885 218,885 218,885 218,885 218,885 218,885 218,885 218,885

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 86,316 87,645 87,645 87,645 87,645 87,645 87,645 87,645 87,645 87,645 87,645 87,645 87,645

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN


17.12 ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y UN 257,748 264,688 264,688 264,688 264,688 264,688 264,688 264,688 264,688 264,688 264,688 264,688 264,688
GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN


17.13 ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y UN 378,550 389,445 389,445 389,445 389,445 389,445 389,445 389,445 389,445 389,445 389,445 389,445 389,445
GRIFERÍA)

18 PINTURAS
IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O
18.1 SIMILAR
M2 8,760 8,885 8,885 8,885 8,885 8,885 8,885 8,885 8,885 8,885 8,885 8,885 8,885
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 3,229 3,287 3,287 3,287 3,287 3,287 3,287 3,287 3,287 3,287 3,287 3,287 3,287
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 11,762 11,871 11,871 11,871 11,871 11,871 11,871 11,871 11,871 11,871 11,871 11,871 11,871
18.4 BARNIZ SOBRE MUEBLES M2 44,156 44,926 44,926 44,926 44,926 44,926 44,926 44,926 44,926 44,926 44,926 44,926 44,926
18.5 CARBURO SOBRE PAÑETES M2 6,159 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221 6,221
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 67,504 69,529 69,529 69,529 69,529 69,529 69,529 69,529 69,529 69,529 69,529 69,529 69,529
18.7 DEMARCACIÓN CON MARMOLINA ML 3,678 3,705 3,705 3,705 3,705 3,705 3,705 3,705 3,705 3,705 3,705 3,705 3,705
18.8 ESMALTE SOBRE LÁMINA LINEAL ML 2,905 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952
18.9 ESMALTE SOBRE LÁMINA LLENA M2 14,651 14,845 14,845 14,845 14,845 14,845 14,845 14,845 14,845 14,845 14,845 14,845 14,845
18.10 ESMALTE SOBRE MADERA LINEAL ML 4,231 4,295 4,295 4,295 4,295 4,295 4,295 4,295 4,295 4,295 4,295 4,295 4,295
18.11 ESMALTE SOBRE MADERA LLENA M2 15,443 15,651 15,651 15,651 15,651 15,651 15,651 15,651 15,651 15,651 15,651 15,651 15,651
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 5,962 6,096 6,096 6,096 6,096 6,096 6,096 6,096 6,096 6,096 6,096 6,096 6,096
18.13 ESMALTE SOBRE MARCOS MADERA M2 6,802 6,943 6,943 6,943 6,943 6,943 6,943 6,943 6,943 6,943 6,943 6,943 6,943
18.14 ESTUCO M2 7,433 7,490 7,490 7,490 7,490 7,490 7,490 7,490 7,490 7,490 7,490 7,490 7,490
18.15 ESTUCO (LINEAL) ML 4,665 4,694 4,694 4,694 4,694 4,694 4,694 4,694 4,694 4,694 4,694 4,694 4,694
18.16 ESTUCO Y VINILO 3 MANOS M2 16,332 16,532 16,532 16,532 16,532 16,532 16,532 16,532 16,532 16,532 16,532 16,532 16,532
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 10,158 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257 10,257
18.18 LACA PISOS MADERA M2 24,091 24,285 24,285 24,285 24,285 24,285 24,285 24,285 24,285 24,285 24,285 24,285 24,285
18.19 LÍNEAS TRÁFICO 0.10 ML 2,832 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863
18.20 MARMOLINA SOBRE PAÑETE M2 12,660 12,925 12,925 12,925 12,925 12,925 12,925 12,925 12,925 12,925 12,925 12,925 12,925
18.21 TINTILLA SOBRE MADERA LINEAL ML 3,421 3,489 3,489 3,489 3,489 3,489 3,489 3,489 3,489 3,489 3,489 3,489 3,489
18.22 TINTILLA SOBRE MADERA LLENA M2 13,224 13,409 13,409 13,409 13,409 13,409 13,409 13,409 13,409 13,409 13,409 13,409 13,409
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 7,450 7,545 7,545 7,545 7,545 7,545 7,545 7,545 7,545 7,545 7,545 7,545 7,545
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML 4,701 4,748 4,748 4,748 4,748 4,748 4,748 4,748 4,748 4,748 4,748 4,748 4,748
18.25 WASH-PRIMER SOBRE ALUMNIO M2 22,720 23,166 23,166 23,166 23,166 23,166 23,166 23,166 23,166 23,166 23,166 23,166 23,166
18.26 PINTURA EPÓXICA M2 13,378 13,518 13,518 13,518 13,518 13,518 13,518 13,518 13,518 13,518 13,518 13,518 13,518
18.27 PINTURA EPÓXICA (LINEAL) ML 8,289 8,359 8,359 8,359 8,359 8,359 8,359 8,359 8,359 8,359 8,359 8,359 8,359

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 6,210,648 6,411,676 6,411,676 6,411,676 6,411,676 6,411,676 6,411,676 6,411,676 6,411,676 6,411,676 6,411,676 6,411,676 6,411,676
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN 10,973,309 11,328,459 11,328,459 11,328,459 11,328,459 11,328,459 11,328,459 11,328,459 11,328,459 11,328,459 ### 11,328,459 11,328,459
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 2,871,994 2,964,776 2,964,776 2,964,776 2,964,776 2,964,776 2,964,776 2,964,776 2,964,776 2,964,776 2,964,776 2,964,776 2,964,776
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO
19.4 (PAR)
UN 9,385,237 9,688,836 9,688,836 9,688,836 9,688,836 9,688,836 9,688,836 9,688,836 9,688,836 9,688,836 9,688,836 9,688,836 9,688,836
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8,787,640 9,072,792 9,072,792 9,072,792 9,072,792 9,072,792 9,072,792 9,072,792 9,072,792 9,072,792 9,072,792 9,072,792 9,072,792
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,832 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863 2,863
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 882,802 910,425 910,425 910,425 910,425 910,425 910,425 910,425 910,425 910,425 910,425 910,425 910,425
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 88,015 90,896 90,896 90,896 90,896 90,896 90,896 90,896 90,896 90,896 90,896 90,896 90,896
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,595,407 1,647,050 1,647,074 1,647,085 1,647,050 1,646,969 1,646,911 1,647,202 1,646,852 1,647,318 1,647,050 1,647,120 1,646,736
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 694,990 720,648 721,195 721,469 720,648 718,733 717,366 724,204 715,998 726,939 720,648 722,289 713,263

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 30,265 30,867 30,867 30,867 30,867 30,867 30,867 30,867 30,867 30,867 30,867 30,867 30,867
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 44,893 45,934 45,934 45,934 45,934 45,934 45,934 45,934 45,934 45,934 45,934 45,934 45,934
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 55,638 56,979 56,979 56,979 56,979 56,979 56,979 56,979 56,979 56,979 56,979 56,979 56,979
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20.4 ACCESORIOS)
ML 18,225 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550 18,550

TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE


20.5 ACCESORIOS) ML 22,064 22,495 22,495 22,495 22,495 22,495 22,495 22,495 22,495 22,495 22,495 22,495 22,495

TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE


20.6 ACCESORIOS)
ML 30,049 30,683 30,683 30,683 30,683 30,683 30,683 30,683 30,683 30,683 30,683 30,683 30,683
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 26,944 27,293 27,293 27,293 27,293 27,293 27,293 27,293 27,293 27,293 27,293 27,293 27,293
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 28,417 28,794 28,794 28,794 28,794 28,794 28,794 28,794 28,794 28,794 28,794 28,794 28,794
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 35,513 36,034 36,034 36,034 36,034 36,034 36,034 36,034 36,034 36,034 36,034 36,034 36,034
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
20.10 VÁLVULA DE BOLA GAS 1/2" UN 18,209 18,685 18,685 18,685 18,685 18,685 18,685 18,685 18,685 18,685 18,685 18,685 18,685
20.11 VÁLVULA DE BOLA GAS 3/4" UN 23,831 24,481 24,481 24,481 24,481 24,481 24,481 24,481 24,481 24,481 24,481 24,481 24,481
20.12 VÁLVULA DE BOLA GAS 1" UN 36,579 37,633 37,633 37,633 37,633 37,633 37,633 37,633 37,633 37,633 37,633 37,633 37,633
20.13 VÁLVULA POLIETILENO GAS 1/2" UN 279,369 287,982 287,982 287,982 287,982 287,982 287,982 287,982 287,982 287,982 287,982 287,982 287,982
20.14 VÁLVULA POLIETILENO GAS 3/4" UN 321,463 331,454 331,454 331,454 331,454 331,454 331,454 331,454 331,454 331,454 331,454 331,454 331,454
20.15 VÁLVULA POLIETILENO GAS 1" UN 335,377 345,687 345,687 345,687 345,687 345,687 345,687 345,687 345,687 345,687 345,687 345,687 345,687
20.16 ACOMETIDA GAS 1/2" ML 311,764 320,951 320,951 320,951 320,951 320,951 320,951 320,951 320,951 320,951 320,951 320,951 320,951

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 227,709 234,456 234,456 234,456 234,456 234,456 234,456 234,456 234,456 234,456 234,456 234,456 234,456
21.2 CABLE DETECTOR LINEAL DE CALOR ML 34,791 35,902 35,902 35,902 35,902 35,902 35,902 35,902 35,902 35,902 35,902 35,902 35,902
21.3 SIRENA DE 110 V UN 106,664 109,565 109,565 109,565 109,565 109,565 109,565 109,565 109,565 109,565 109,565 109,565 109,565
21.4 CÁMARA CCTV UN 273,688 279,109 279,109 279,109 279,109 279,109 279,109 279,109 279,109 279,109 279,109 279,109 279,109
21.5 PARLANTE-CIELO FALSO UN 53,985 55,163 55,163 55,163 55,163 55,163 55,163 55,163 55,163 55,163 55,163 55,163 55,163
21.6 AMPLIFICADOR 100W UN 590,254 606,629 606,629 606,629 606,629 606,629 606,629 606,629 606,629 606,629 606,629 606,629 606,629
21.7 AMPLIFICADOR 300W UN 1,457,342 1,502,222 1,502,222 1,502,222 1,502,222 1,502,222 1,502,222 1,502,222 1,502,222 1,502,222 1,502,222 1,502,222 1,502,222
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 47,618 47,815 47,815 47,815 47,815 47,815 47,815 47,815 47,815 47,815 47,815 47,815 47,815
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 227,396 234,399 234,399 234,399 234,399 234,399 234,399 234,399 234,399 234,399 234,399 234,399 234,399
21.10 TOMA PARA MICRÓFONO UN 45,887 46,714 46,714 46,714 46,714 46,714 46,714 46,714 46,714 46,714 46,714 46,714 46,714
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 3,887 3,985 3,985 3,985 3,985 3,985 3,985 3,985 3,985 3,985 3,985 3,985 3,985
21.12 SPLITERS UN 6,485 6,680 6,680 6,680 6,680 6,680 6,680 6,680 6,680 6,680 6,680 6,680 6,680
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 19,638 19,839 19,839 19,839 19,839 19,839 19,839 19,839 19,839 19,839 19,839 19,839 19,839
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 25,657 25,957 25,957 25,957 25,957 25,957 25,957 25,957 25,957 25,957 25,957 25,957 25,957
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 33,277 33,712 33,712 33,712 33,712 33,712 33,712 33,712 33,712 33,712 33,712 33,712 33,712
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 126,299 129,912 129,912 129,912 129,912 129,912 129,912 129,912 129,912 129,912 129,912 129,912 129,912
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO
21.17 30X120
ML 32,968 33,898 33,898 33,898 33,898 33,898 33,898 33,898 33,898 33,898 33,898 33,898 33,898
21.18 BANDEJA PORTACABLES PARA RACK UN 107,485 110,751 110,751 110,751 110,751 110,751 110,751 110,751 110,751 110,751 110,751 110,751 110,751
21.19 RACK 2' X 24" UN 191,878 195,210 195,210 195,210 195,210 195,210 195,210 195,210 195,210 195,210 195,210 195,210 195,210
21.20 RACK 3' X 24" UN 299,107 305,950 305,950 305,950 305,950 305,950 305,950 305,950 305,950 305,950 305,950 305,950 305,950
21.21 RACK 5' X 24" UN 372,651 380,427 380,427 380,427 380,427 380,427 380,427 380,427 380,427 380,427 380,427 380,427 380,427
21.22 RACK 7' X 24" UN 406,584 415,471 415,471 415,471 415,471 415,471 415,471 415,471 415,471 415,471 415,471 415,471 415,471
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 598,844 609,602 609,602 609,602 609,602 609,602 609,602 609,602 609,602 609,602 609,602 609,602 609,602
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 353,759 359,443 359,443 359,443 359,443 359,443 359,443 359,443 359,443 359,443 359,443 359,443 359,443
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y
21.25 MARCACIÓN)
UN 107,081 110,117 110,117 110,117 110,117 110,117 110,117 110,117 110,117 110,117 110,117 110,117 110,117
21.26 PATCH CORD 2M CATEGORÍA 6A UN 14,210 14,649 14,649 14,649 14,649 14,649 14,649 14,649 14,649 14,649 14,649 14,649 14,649
21.27 PATCH CORD 5M CATEGORÍA 6A UN 29,004 29,929 29,929 29,929 29,929 29,929 29,929 29,929 29,929 29,929 29,929 29,929 29,929
21.28 CABLE UTP CATEGORÍA 6A ML 5,195 5,306 5,306 5,306 5,306 5,306 5,306 5,306 5,306 5,306 5,306 5,306 5,306
21.29 CANALETA METÁLICA 4X6 CMS ML 36,758 37,432 37,432 37,432 37,432 37,432 37,432 37,432 37,432 37,432 37,432 37,432 37,432
21.30 CANALETA METÁLICA 4X10 CMS ML 38,375 39,102 39,102 39,102 39,102 39,102 39,102 39,102 39,102 39,102 39,102 39,102 39,102
21.31 CANALETA METÁLICA 6X10 CMS ML 39,184 39,937 39,937 39,937 39,937 39,937 39,937 39,937 39,937 39,937 39,937 39,937 39,937
21.32 CANALETA PLÁSTICA 13X7 MM ML 25,577 26,060 26,060 26,060 26,060 26,060 26,060 26,060 26,060 26,060 26,060 26,060 26,060
21.33 CANALETA PLÁSTICA 20X12 MM ML 28,238 28,808 28,808 28,808 28,808 28,808 28,808 28,808 28,808 28,808 28,808 28,808 28,808
21.34 CANALETA PLÁSTICA 32X12 MM ML 29,355 29,962 29,962 29,962 29,962 29,962 29,962 29,962 29,962 29,962 29,962 29,962 29,962
21.35 CANALETA PLÁSTICA 40X60 MM ML 49,004 50,254 50,254 50,254 50,254 50,254 50,254 50,254 50,254 50,254 50,254 50,254 50,254
21.36 SWITCH 10/100/1000 24 PUERTOS UN 631,652 649,382 649,382 649,382 649,382 649,382 649,382 649,382 649,382 649,382 649,382 649,382 649,382
21.37 SWITCH 10/100/1000 16 PUERTOS UN 325,452 333,894 333,894 333,894 333,894 333,894 333,894 333,894 333,894 333,894 333,894 333,894 333,894
21.38 SWITCH 10/100/1000 8 PUERTOS UN 92,546 94,101 94,101 94,101 94,101 94,101 94,101 94,101 94,101 94,101 94,101 94,101 94,101
21.39 CABLE TELEFÓNICO 2 PARES ML 1,912 1,949 1,949 1,949 1,949 1,949 1,949 1,949 1,949 1,949 1,949 1,949 1,949
21.40 CABLE TELEFÓNICO 10 PARES ML 8,813 8,996 8,996 8,996 8,996 8,996 8,996 8,996 8,996 8,996 8,996 8,996 8,996
21.41 CABLE TELEFÓNICO 20 PARES ML 13,077 13,394 13,394 13,394 13,394 13,394 13,394 13,394 13,394 13,394 13,394 13,394 13,394
21.42 CABLE TELEFÓNICO 40 PARES ML 21,771 22,337 22,337 22,337 22,337 22,337 22,337 22,337 22,337 22,337 22,337 22,337 22,337
21.43 CABLE TELEVISIÓN RG6 ML 4,059 4,147 4,147 4,147 4,147 4,147 4,147 4,147 4,147 4,147 4,147 4,147 4,147
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
21.44 ACOMETIDA TELEFÓNICA 1/2" ML 23,624 23,807 23,807 23,807 23,807 23,807 23,807 23,807 23,807 23,807 23,807 23,807 23,807
21.45 ACOMETIDA TELEFÓNICA 1" ML 34,199 34,580 34,580 34,580 34,580 34,580 34,580 34,580 34,580 34,580 34,580 34,580 34,580
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 20,273 20,581 20,581 20,581 20,581 20,581 20,581 20,581 20,581 20,581 20,581 20,581 20,581
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN)
ML 15,962 16,308 16,308 16,308 16,308 16,308 16,308 16,308 16,308 16,308 16,308 16,308 16,308

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 635,016 654,540 654,540 654,540 654,540 654,540 654,540 654,540 654,540 654,540 654,540 654,540 654,540
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
URBANISMO
1 ACUEDUCTO
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 27,919 28,692 28,692 28,692 28,692 28,692 28,692 28,692 28,692 28,692 28,692 28,692 28,692
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 93,032 95,843 95,843 95,843 95,843 95,843 95,843 95,843 95,843 95,843 95,843 95,843 95,843
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 522,552 539,192 539,192 539,192 539,192 539,192 539,192 539,192 539,192 539,192 539,192 539,192 539,192
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 1,115,229 1,150,804 1,150,804 1,150,804 1,150,804 1,150,804 1,150,804 1,150,804 1,150,804 1,150,804 1,150,804 1,150,804 1,150,804
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 128,055 132,012 132,012 132,012 132,012 132,012 132,012 132,012 132,012 132,012 132,012 132,012 132,012
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 778,469 803,487 803,487 803,487 803,487 803,487 803,487 803,487 803,487 803,487 803,487 803,487 803,487
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,674,450 1,728,801 1,728,801 1,728,801 1,728,801 1,728,801 1,728,801 1,728,801 1,728,801 1,728,801 1,728,801 1,728,801 1,728,801
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 13,658 13,918 13,918 13,918 13,918 13,918 13,918 13,918 13,918 13,918 13,918 13,918 13,918
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 16,775 17,137 17,137 17,137 17,137 17,137 17,137 17,137 17,137 17,137 17,137 17,137 17,137
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 20,987 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 22,942 23,506 23,506 23,506 23,506 23,506 23,506 23,506 23,506 23,506 23,506 23,506 23,506
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 27,444 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 27,444 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155 28,155
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 109,345 112,784 112,784 112,784 112,784 112,784 112,784 112,784 112,784 112,784 112,784 112,784 112,784
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 126,694 130,655 130,655 130,655 130,655 130,655 130,655 130,655 130,655 130,655 130,655 130,655 130,655
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 391,901 404,264 404,264 404,264 404,264 404,264 404,264 404,264 404,264 404,264 404,264 404,264 404,264
1.17 TEE PVC UNIÓN MECÁNICA 2" UN 147,106 151,781 151,781 151,781 151,781 151,781 151,781 151,781 151,781 151,781 151,781 151,781 151,781
1.18 TEE PVC UNIÓN MECÁNICA 4" UN 242,508 250,212 250,212 250,212 250,212 250,212 250,212 250,212 250,212 250,212 250,212 250,212 250,212
1.19 TEE PVC UNIÓN MECÁNICA 8" UN 1,072,195 1,106,829 1,106,829 1,106,829 1,106,829 1,106,829 1,106,829 1,106,829 1,106,829 1,106,829 1,106,829 1,106,829 1,106,829
1.20 TEE PVC UNIÓN MECÁNICA 10" UN 1,235,210 1,275,181 1,275,181 1,275,181 1,275,181 1,275,181 1,275,181 1,275,181 1,275,181 1,275,181 1,275,181 1,275,181 1,275,181
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 14,713 15,054 15,054 15,054 15,054 15,054 15,054 15,054 15,054 15,054 15,054 15,054 15,054
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 13,010 13,295 13,295 13,295 13,295 13,295 13,295 13,295 13,295 13,295 13,295 13,295 13,295
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 31,589 32,604 32,604 32,604 32,604 32,604 32,604 32,604 32,604 32,604 32,604 32,604 32,604
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 125,973 129,630 129,630 129,630 129,630 129,630 129,630 129,630 129,630 129,630 129,630 129,630 129,630
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 187,213 192,875 192,875 192,875 192,875 192,875 192,875 192,875 192,875 192,875 192,875 192,875 192,875
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 30,778 31,599 31,599 31,599 31,599 31,599 31,599 31,599 31,599 31,599 31,599 31,599 31,599
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 105,733 108,727 108,727 108,727 108,727 108,727 108,727 108,727 108,727 108,727 108,727 108,727 108,727
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 156,307 160,957 160,957 160,957 160,957 160,957 160,957 160,957 160,957 160,957 160,957 160,957 160,957
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 31,027 31,902 31,902 31,902 31,902 31,902 31,902 31,902 31,902 31,902 31,902 31,902 31,902
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 63,882 65,739 65,739 65,739 65,739 65,739 65,739 65,739 65,739 65,739 65,739 65,739 65,739
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 256,507 264,437 264,437 264,437 264,437 264,437 264,437 264,437 264,437 264,437 264,437 264,437 264,437
1.32 UNIÓN REPARACION PVC 4" UN 74,470 76,674 76,674 76,674 76,674 76,674 76,674 76,674 76,674 76,674 76,674 76,674 76,674
1.33 UNIÓN REPARACIÓN PVC 8" UN 298,313 307,611 307,611 307,611 307,611 307,611 307,611 307,611 307,611 307,611 307,611 307,611 307,611
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 179,781 184,824 184,824 184,824 184,824 184,824 184,824 184,824 184,824 184,824 184,824 184,824 184,824
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 509,132 524,968 524,968 524,968 524,968 524,968 524,968 524,968 524,968 524,968 524,968 524,968 524,968
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,360,500 1,404,778 1,404,778 1,404,778 1,404,778 1,404,778 1,404,778 1,404,778 1,404,778 1,404,778 1,404,778 1,404,778 1,404,778
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 2,010,148 2,075,657 2,075,657 2,075,657 2,075,657 2,075,657 2,075,657 2,075,657 2,075,657 2,075,657 2,075,657 2,075,657 2,075,657

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 11,303 11,430 11,430 11,430 11,430 11,430 11,430 11,430 11,430 11,430 11,430 11,430 11,430
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 25,886 26,142 26,142 26,142 26,142 26,142 26,142 26,142 26,142 26,142 26,142 26,142 26,142
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 66,704 98,640 100,069 100,783 98,640 93,638 90,066 107,928 86,492 115,073 98,640 102,927 79,347
2.5 RELLENO TIPO 2 "RECEBO" M3 81,748 102,630 111,418 88,569 83,296 85,054 67,478 58,690 67,478 88,569 81,538 88,569 41,114
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 83,590 102,264 107,537 86,446 84,688 79,415 75,900 89,961 68,870 114,567 82,931 81,173 49,536
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 104,493 119,177 125,326 114,053 112,003 108,928 101,754 108,928 102,779 126,351 110,978 123,276 91,506
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 84,836 85,434 91,703 80,210 78,121 74,987 70,808 81,255 68,718 95,882 77,076 89,613 57,226
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 91,509 144,478 146,459 147,450 144,478 137,542 132,588 157,358 127,634 167,266 144,478 150,423 117,726

3 ALCANTARILLADO - TUBERÍA
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
3.1 CODO 45 PVC ALCANTARILLADO 8" UN 116,872 120,558 120,558 120,558 120,558 120,558 120,558 120,558 120,558 120,558 120,558 120,558 120,558
3.2 CODO 45 PVC ALCANTARILLADO 16" UN 1,216,498 1,256,136 1,256,136 1,256,136 1,256,136 1,256,136 1,256,136 1,256,136 1,256,136 1,256,136 1,256,136 1,256,136 1,256,136
3.3 CODO 90 PVC ALCANTARILLADO 8" UN 152,665 157,523 157,523 157,523 157,523 157,523 157,523 157,523 157,523 157,523 157,523 157,523 157,523
3.4 CODO 90 PVC ALCANTARILLADO 16" UN 1,408,967 1,454,906 1,454,906 1,454,906 1,454,906 1,454,906 1,454,906 1,454,906 1,454,906 1,454,906 1,454,906 1,454,906 1,454,906
3.5 CODO 90 PVC ALCANTARILLADO 24" UN 982,202 1,014,124 1,014,124 1,014,124 1,014,124 1,014,124 1,014,124 1,014,124 1,014,124 1,014,124 1,014,124 1,014,124 1,014,124
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 63,118 63,545 63,545 63,545 63,545 63,545 63,545 63,545 63,545 63,545 63,545 63,545 63,545
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 116,021 119,678 119,678 119,678 119,678 119,678 119,678 119,678 119,678 119,678 119,678 119,678 119,678
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 273,730 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 273,723 282,497 282,497 282,497 282,497 282,497 282,497 282,497 282,497 282,497 282,497 282,497 282,497
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 439,349 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 116,070 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 116,070 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729 119,729
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 273,730 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 273,730 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504 282,504
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 439,349 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498 453,498
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 442,142 455,237 455,237 455,237 455,237 455,237 455,237 455,237 455,237 455,237 455,237 455,237 455,237
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 717,081 739,178 739,178 739,178 739,178 739,178 739,178 739,178 739,178 739,178 739,178 739,178 739,178
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 1,150,626 1,186,389 1,186,389 1,186,389 1,186,389 1,186,389 1,186,389 1,186,389 1,186,389 1,186,389 1,186,389 1,186,389 1,186,389
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 71,224 73,409 73,409 73,409 73,409 73,409 73,409 73,409 73,409 73,409 73,409 73,409 73,409
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 370,203 380,944 380,944 380,944 380,944 380,944 380,944 380,944 380,944 380,944 380,944 380,944 380,944
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 414,303 427,397 427,397 427,397 427,397 427,397 427,397 427,397 427,397 427,397 427,397 427,397 427,397
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 1,146,286 1,182,028 1,182,028 1,182,028 1,182,028 1,182,028 1,182,028 1,182,028 1,182,028 1,182,028 1,182,028 1,182,028 1,182,028
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 67,184 69,724 69,744 69,754 69,724 69,652 69,601 69,857 69,550 69,959 69,724 69,785 69,448
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 335,730 345,342 345,342 345,342 345,342 345,342 345,342 345,342 345,342 345,342 345,342 345,342 345,342
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML 51,106 52,643 52,643 52,643 52,643 52,643 52,643 52,643 52,643 52,643 52,643 52,643 52,643
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML 72,192 74,416 74,416 74,416 74,416 74,416 74,416 74,416 74,416 74,416 74,416 74,416 74,416
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML 104,082 107,350 107,350 107,350 107,350 107,350 107,350 107,350 107,350 107,350 107,350 107,350 107,350
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML 159,722 164,765 164,765 164,765 164,765 164,765 164,765 164,765 164,765 164,765 164,765 164,765 164,765
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 256,516 264,727 264,727 264,727 264,727 264,727 264,727 264,727 264,727 264,727 264,727 264,727 264,727
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 372,634 383,941 383,941 383,941 383,941 383,941 383,941 383,941 383,941 383,941 383,941 383,941 383,941
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 471,401 485,894 485,894 485,894 485,894 485,894 485,894 485,894 485,894 485,894 485,894 485,894 485,894
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 619,767 638,893 638,893 638,893 638,893 638,893 638,893 638,893 638,893 638,893 638,893 638,893 638,893
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 852,050 878,780 878,780 878,780 878,780 878,780 878,780 878,780 878,780 878,780 878,780 878,780 878,780

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000
4.1 PSI CON REFUERZO)
UN 689,272 721,815 723,127 723,784 721,815 717,219 713,937 730,348 710,655 736,912 721,815 725,753 704,091

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M


4.2 (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML 682,656 703,689 704,659 705,145 703,689 700,291 697,863 710,000 695,435 714,855 703,689 706,602 690,581

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON


4.3 REFUERZO (INCLUYE ARO Y TAPA HF) UN 732,433 761,707 762,582 763,020 761,707 758,644 756,456 767,396 754,268 771,772 761,707 764,333 749,892

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000


4.4 PSI CON REFUERZO)
UN 817,419 857,911 859,552 860,373 857,911 852,167 848,065 868,578 843,962 876,784 857,911 862,834 835,757

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M


4.5 (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML 966,334 998,075 999,442 1,000,126 998,075 993,290 989,871 1,006,963 986,453 1,013,799 998,075 1,002,177 979,617

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON


4.6 REFUERZO (INCLUYE ARO Y TAPA HF)
UN 844,813 881,596 882,799 883,401 881,596 877,383 874,375 889,418 871,366 895,435 881,596 885,206 865,349
4.7 SUMIDERO EN LADRILLO SL-100 UN 1,038,591 1,061,048 1,061,714 1,062,045 1,061,048 1,058,718 1,057,055 1,065,376 1,055,391 1,068,703 1,061,048 1,063,046 1,052,060
4.8 SUMIDERO EN LADRILLO SL-250 UN 1,502,848 1,550,155 1,552,056 1,553,002 1,550,155 1,543,504 1,538,754 1,562,509 1,534,005 1,572,007 1,550,155 1,555,858 1,524,499
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 2,038,250 2,125,045 2,128,541 2,130,288 2,125,045 2,112,810 2,104,071 2,147,767 2,095,331 2,165,245 2,125,045 2,135,532 2,077,853
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,707,280 2,834,020 2,839,830 2,842,734 2,834,020 2,813,680 2,799,154 2,871,789 2,784,626 2,900,843 2,834,020 2,851,452 2,755,572
4.11 SUMIDERO PREFABRICADO SL-100 UN 1,874,611 1,927,880 1,927,880 1,927,880 1,927,880 1,927,880 1,927,880 1,927,880 1,927,880 1,927,880 1,927,880 1,927,880 1,927,880
4.12 SUMIDERO PREFABRICADO SL-250 UN 3,956,242 4,074,775 4,074,775 4,074,775 4,074,775 4,074,775 4,074,775 4,074,775 4,074,775 4,074,775 4,074,775 4,074,775 4,074,775
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta

NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,


4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN 144,435 146,918 146,958 146,978 146,918 146,779 146,680 147,176 146,581 147,374 146,918 147,037 146,383

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 75,101 79,565 79,672 79,725 79,565 79,191 78,925 80,258 78,658 80,792 79,565 79,885 78,124
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 88,829 93,761 93,868 93,921 93,761 93,387 93,121 94,454 92,854 94,988 93,761 94,081 92,320
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 57,938 62,104 62,341 62,460 62,104 61,271 60,677 63,649 60,082 64,838 62,104 62,817 58,894
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 62,388 66,744 66,974 67,089 66,744 65,940 65,365 68,237 64,791 69,386 66,744 67,433 63,642
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 62,680 66,925 67,149 67,261 66,925 66,142 65,582 68,379 65,023 69,498 66,925 67,596 63,904
5.6 BORDE SEPARADOR VERDE A-170 ML 258,827 267,038 267,077 267,097 267,038 266,899 266,800 267,295 266,701 267,493 267,038 267,157 266,503
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 19,327 19,864 19,892 19,906 19,864 19,764 19,692 20,049 19,621 20,192 19,864 19,949 19,478

5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 41,519 44,425 44,592 44,676 44,425 43,838 43,419 45,514 43,000 46,352 44,425 44,927 42,162
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML 85,892 88,133 88,155 88,165 88,133 88,059 88,006 88,271 87,953 88,377 88,133 88,197 87,847
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 577,074 593,598 594,111 594,367 593,598 591,804 590,523 596,930 589,241 599,493 593,598 595,136 586,678
5.11 LOSETA PREFABRICADA A-40 M2 65,651 67,580 67,670 67,716 67,580 67,262 67,036 68,169 66,809 68,623 67,580 67,852 66,355
5.12 LOSETA PREFABRICADA A-60 M2 93,991 97,033 97,124 97,169 97,033 96,716 96,489 97,623 96,262 98,076 97,033 97,305 95,809
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE
5.13 3000 PSI
ML 34,542 36,358 36,450 36,496 36,358 36,036 35,806 36,955 35,577 37,415 36,358 36,633 35,117

SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000


5.14 PSI ML 55,371 58,923 59,109 59,202 58,923 58,272 57,807 60,132 57,343 61,062 58,923 59,481 56,413
5.15 SARDINEL PREFABRICADO A-10 ML 101,657 108,378 109,394 107,216 106,587 105,916 103,873 106,327 104,815 108,621 106,388 109,237 100,729
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 62,704 64,428 64,483 64,510 64,428 64,236 64,099 64,785 63,962 65,059 64,428 64,593 63,687

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN 207,488 214,560 214,669 214,724 214,560 214,177 213,903 215,271 213,630 215,818 214,560 214,888 213,083
6.2 BANCA EN CONCRETO M-30 UN 678,547 700,961 701,115 701,191 700,961 700,425 700,042 701,957 699,660 702,723 700,961 701,421 698,894
6.3 BOLARDO M-63 ALTO/HIERRO UN 219,660 225,840 225,863 225,874 225,840 225,759 225,702 225,989 225,644 226,104 225,840 225,909 225,529
6.4 BOLARDO M-60 CONCRETO UN 166,167 171,941 172,072 172,138 171,941 171,481 171,153 172,794 170,825 173,451 171,941 172,335 170,169
6.5 BOLARDO M-61 BAJO/CONCRETO UN 168,147 173,921 174,052 174,118 173,921 173,461 173,133 174,774 172,805 175,430 173,921 174,314 172,148
6.6 BOLARDO M-62 BAJO/HIERRO UN 196,728 203,581 203,719 203,788 203,581 203,098 202,753 204,479 202,407 205,169 203,581 203,996 201,717
6.7 BORDE CONTENEDOR DE RAICES A-70 ML 60,716 63,846 63,927 63,968 63,846 63,560 63,355 64,377 63,151 64,785 63,846 64,091 62,743
6.8 BORDILLO PREFABRICADO A-80 ML 69,247 73,457 73,549 73,594 73,457 73,137 72,908 74,052 72,680 74,509 73,457 73,731 72,222
6.9 CANECA M-120 UN 317,174 327,349 327,370 327,380 327,349 327,278 327,227 327,482 327,176 327,584 327,349 327,411 327,074
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 837,167 863,121 863,187 863,219 863,121 862,891 862,727 863,548 862,563 863,876 863,121 863,318 862,235
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3,425,546 3,535,404 3,535,447 3,535,469 3,535,404 3,535,250 3,535,141 3,535,688 3,535,032 3,535,907 3,535,404 3,535,535 3,534,813
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 3,523,794 3,636,869 3,636,912 3,636,934 3,636,869 3,636,715 3,636,606 3,637,153 3,636,497 3,637,372 3,636,869 3,637,000 3,636,278
6.13 CICLOPARQUEADERO M100 TIPO 1 UN 493,192 509,188 509,234 509,257 509,188 509,027 508,912 509,487 508,797 509,717 509,188 509,326 508,567
6.14 CICLOPARQUEADERO M101 TIPO 2 UN 653,461 676,207 676,391 676,483 676,207 675,563 675,102 677,404 674,642 678,324 676,207 676,759 673,721
6.15 BANCA EN MADERA M-50 UN 543,163 559,810 559,810 559,810 559,810 559,810 559,810 559,810 559,810 559,810 559,810 559,810 559,810
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 253,655 261,053 261,118 261,151 261,053 260,823 260,659 261,479 260,495 261,808 261,053 261,250 260,167
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 583,886 603,525 603,576 603,601 603,525 603,346 603,218 603,856 603,090 604,112 603,525 603,678 602,835
6.18 POSTE HISTÓRICO M-131 UN 6,509,998 6,722,241 6,722,569 6,722,733 6,722,241 6,721,092 6,720,272 6,724,374 6,719,451 6,726,015 6,722,241 6,723,226 6,717,810

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 4,091 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 44,236 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350
7.3 SEÑAL DOBLE DE CICLORUTA UN 319,242 328,830 328,849 328,859 328,830 328,760 328,711 328,958 328,661 329,058 328,830 328,889 328,562
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 502,486 517,982 518,074 518,120 517,982 517,660 517,430 518,580 517,200 519,041 517,982 518,258 516,739
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 239,863 245,823 245,843 245,853 245,823 245,754 245,704 245,952 245,655 246,051 245,823 245,883 245,556
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 254,604 261,046 261,066 261,076 261,046 260,977 260,927 261,175 260,878 261,274 261,046 261,106 260,779
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 265,767 272,574 272,594 272,604 272,574 272,505 272,455 272,703 272,406 272,802 272,574 272,634 272,307
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
7.8 TACHAS REFLECTIVAS UN 13,787 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 14,717 15,127 15,127 15,127 15,127 15,127 15,127 15,127 15,127 15,127 15,127 15,127 15,127

TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M


7.10 (INCLUYE SUMINISTRO E INSTALACIÓN)
UN 119,591 123,246 123,246 123,246 123,246 123,246 123,246 123,246 123,246 123,246 123,246 123,246 123,246
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
NORMA PRELIMILARES
1 INV

1.1 201 P DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y


RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO


DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO


DE SOBRANTES A UNA DISTANCIA DE 5KM) HA 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

1.4 200.2 DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE


CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE


SOBRANTES A UNA DISTANCIA DE 5KM)
M3 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN,


1.6 *** CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES M3-KM 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

NORMA EXPLANACIÓN Y EXCAVACIONES


2 INV

2.1 210.1.1 EXCAVACIÓN


PRÉSTAMOS
SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
M3 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822

2.2 210.2.1 EXCAVACIÓN


PRÉSTAMOS
EN ROCA DE LA EXPLANACIÓN, CANALES Y M3 35,916 36,308 36,308 36,308 36,308 36,308 36,308 36,308 36,308 36,308 36,308 36,308 36,308

2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN,


CANALES Y PRÉSTAMOS
M3 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO
SUELO EXISTENTE
DE LA SUBRASANTE INVOLUCRANDO EL
M2 494 494 494 494 494 494 494 494 494 494 494 494 494

2.8 230.2 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO


ÚNICAMENTE MATERIAL ADICIONADO
M3 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

2.9 600.1 EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

2.10 600.2 EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE


SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 66,309 66,801 66,801 66,801 66,801 66,801 66,801 66,801 66,801 66,801 66,801 66,801 66,801

2.11 600.3 EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO


DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 81,475 81,967 81,967 81,967 81,967 81,967 81,967 81,967 81,967 81,967 81,967 81,967 81,967

2.12 600.4 EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE


RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO


2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE M3 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639
5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA


2.14 600.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE M3 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090
5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A


2.15 600.5 P MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA M3 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302
MENOR DE 5 KM)

NORMA ESTRUCTURA DE PAVIMENTO


3 INV
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 164,310 151,342 158,373 139,039 135,524 130,251 112,675 132,009 121,463 151,342 133,766 158,373 86,311
3.3 330.1 BASE GRANULAR M3 171,023 186,606 195,394 176,061 170,788 165,515 147,939 167,273 156,727 186,606 169,030 193,637 121,575
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE
3.4 365.1 (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 M3 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
Km)
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 3,266 3,357 3,357 3,357 3,357 3,357 3,357 3,357 3,357 3,357 3,357 3,357 3,357
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,142 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163
3.7 461.1 PAVIMENTO
ASFÁLTICA
RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
M3 224,078 236,442 236,839 237,038 236,442 235,053 234,060 239,023 233,068 241,008 236,442 237,633 231,083
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 69,276 71,940 72,078 72,146 71,940 71,460 71,116 72,833 70,773 73,520 71,940 72,352 70,086
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
ASFÁLTICO)
M3 637,531 569,067 613,007 548,787 580,897 582,587 611,317 540,337 589,347 569,067 629,907 587,657 668,248

3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE


CEMENTO ASFÁLTICO) M3 646,742 575,053 618,993 554,773 586,883 588,573 617,303 546,323 595,333 575,053 635,893 593,643 695,883

3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE


CEMENTO ASFÁLTICO)
M3 685,236 614,236 658,176 593,956 626,066 627,756 656,486 585,506 634,516 614,236 675,076 632,826 735,066

3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE


CEMENTO ASFÁLTICO) M3 702,012 606,481 650,421 586,201 618,311 620,001 648,731 577,751 626,761 606,481 667,321 625,071 703,559

3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 342,307 317,092 324,608 314,111 316,109 321,755 301,492 328,094 294,009 349,942 267,742 338,655 281,008

3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 320,424 341,176 349,964 330,630 325,357 320,084 302,508 321,842 311,296 341,176 323,600 348,206 276,144

3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 312,648 304,667 311,697 292,364 288,849 283,576 266,000 285,333 274,788 304,667 287,091 311,697 239,636

3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 39,119 40,127 40,127 40,127 40,127 40,127 40,127 40,127 40,127 40,127 40,127 40,127 40,127

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 173,122 178,309 178,309 178,309 178,309 178,309 178,309 178,309 178,309 178,309 178,309 178,309 178,309
3.15 311.1 AFIRMADO M3 78,036 96,711 101,984 80,892 79,135 73,862 70,347 84,408 63,316 109,014 77,377 75,620 43,983
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11,494 12,291 12,319 12,332 12,291 12,196 12,128 12,468 12,060 12,604 12,291 12,373 11,924

3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4,579 4,965 4,979 4,986 4,965 4,918 4,884 5,054 4,849 5,122 4,965 5,006 4,781

3.18 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE


SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 654,036 694,642 696,749 697,802 694,642 687,266 681,998 708,339 676,729 718,876 694,642 700,963 666,192

3.19 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE


SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 686,604 729,441 731,642 732,743 729,441 721,735 716,230 743,752 710,726 754,760 729,441 736,045 699,717

3.20 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE


SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 708,450 752,675 754,941 756,073 752,675 744,745 739,081 767,401 733,418 778,729 752,675 759,471 722,089

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO


3.21 *** (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y ML 7,326 7,425 7,425 7,425 7,425 7,425 7,425 7,425 7,425 7,425 7,425 7,425 7,425
SELLANTE)
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 123,206 122,655 131,578 115,219 112,244 107,783 101,834 116,706 98,860 137,527 110,757 128,604 82,500

NORMA OBRAS DE ARTE


4 INV
4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 941,620 986,278 988,668 989,863 986,278 977,911 971,935 1,001,815 965,959 1,013,767 986,278 993,448 954,007
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 809,090 852,471 854,821 855,996 852,471 844,243 838,365 867,750 832,489 879,505 852,471 859,523 820,735
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 857,602 902,506 904,949 906,171 902,506 893,952 887,842 918,390 881,733 930,610 902,506 909,837 869,513
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 582,949 622,866 625,018 626,094 622,866 615,333 609,952 636,856 604,571 647,617 622,866 629,323 593,809
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 683,592 725,083 727,320 728,438 725,083 717,251 711,657 739,626 706,063 750,814 725,083 731,795 694,875
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 580,135 621,125 623,335 624,440 621,125 613,389 607,865 635,489 602,340 646,539 621,125 627,755 591,290
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 680,667 723,272 725,570 726,719 723,272 715,230 709,487 738,206 703,743 749,694 723,272 730,165 692,256
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 745,706 786,696 788,906 790,011 786,696 778,960 773,435 801,060 767,911 812,110 786,696 793,325 756,861
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 600,020 642,438 644,735 645,884 642,438 634,396 628,652 657,371 622,909 668,859 642,438 649,330 611,422
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 791,708 834,126 836,423 837,572 834,126 826,084 820,340 849,059 814,597 860,547 834,126 841,018 803,110
4.11 650 P SUMINISTRO,TRANSPORTE,
MONTAJE DE ACERO A-36
FABRICACIÓN, ENSAMBLAJE Y KG 12,280 12,441 12,441 12,441 12,441 12,441 12,441 12,441 12,441 12,441 12,441 12,441 12,441

4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y


MONTAJE DE ACERO A-588 GRADO B KG 15,681 15,945 15,945 15,945 15,945 15,945 15,945 15,945 15,945 15,945 15,945 15,945 15,945
4.13 641.1 ACERO DE PREESFUERZO TON-M 1,842 1,872 1,872 1,872 1,872 1,872 1,872 1,872 1,872 1,872 1,872 1,872 1,872
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO
4.14 621.1 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ML 2,737,251 2,795,141 2,795,141 2,795,141 2,795,141 2,795,141 2,795,141 2,795,141 2,795,141 2,795,141 2,795,141 2,795,141 2,795,141
ANILLOS)

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M.


4.15 621.1 P CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN ML 4,265,741 4,363,307 4,367,396 4,369,439 4,363,307 4,348,995 4,338,773 4,389,884 4,328,552 4,410,328 4,363,307 4,375,573 4,308,106
CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE


REFUERZO)
M3 1,769,081 1,814,867 1,817,055 1,818,149 1,814,867 1,807,208 1,801,738 1,829,089 1,796,268 1,840,030 1,814,867 1,821,431 1,785,328

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 88,898 91,268 91,268 91,268 91,268 91,268 91,268 91,268 91,268 91,268 91,268 91,268 91,268

4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 369,725 379,477 379,740 379,871 379,477 378,558 377,902 381,184 377,245 382,497 379,477 380,265 375,933

4.19 632 P BARANDA METÁLICA ML 434,321 442,525 442,525 442,525 442,525 442,525 442,525 442,525 442,525 442,525 442,525 442,525 442,525
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 17,309 17,740 17,740 17,740 17,740 17,740 17,740 17,740 17,740 17,740 17,740 17,740 17,740
4.21 671.1 CUNETA
LUGAR
DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL
M3 496,348 547,590 553,168 541,354 536,774 525,366 517,371 555,181 507,214 581,986 535,693 541,608 483,653
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 129,363 143,867 152,790 136,431 133,457 128,995 118,585 128,995 120,072 154,277 131,969 149,816 103,713
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 86,205 105,523 113,635 92,544 87,676 89,299 73,075 64,963 73,075 92,544 86,054 92,544 48,739
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 387,670 427,550 429,874 431,035 427,550 419,413 413,602 442,659 407,790 454,282 427,550 434,523 396,167
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.25 630.7 BASES M3 384,121 407,612 412,237 406,978 403,826 397,370 391,754 414,424 387,220 428,900 403,285 413,917 374,367
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.26 630.7 ELEVACIONES
M3 392,792 416,283 420,908 415,649 412,497 406,041 400,425 423,095 395,891 437,571 411,956 422,588 383,038
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 399,471 422,422 427,026 421,756 418,636 412,258 406,698 429,091 402,220 443,456 418,096 428,661 389,477
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 408,142 431,093 435,697 430,427 427,307 420,929 415,369 437,762 410,891 452,127 426,767 437,332 398,148
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 531,593 570,565 572,852 573,995 570,565 562,559 556,841 585,432 551,123 596,868 570,565 577,426 539,687
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 630,429 670,944 673,323 674,510 670,944 662,622 656,677 686,400 650,733 698,290 670,944 678,077 638,844
4.31 681.1 GAVIÓN M3 212,817 214,069 222,586 206,971 204,132 199,873 194,194 208,390 191,355 228,265 202,712 219,747 175,740
4.32 681.1 GAVIÓN MALLA PVC M3 217,024 218,414 226,932 211,316 208,477 204,218 198,540 212,736 195,701 232,610 207,057 224,093 180,085

4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO


CLASE E, 2500 PSI ML 43,781 46,224 46,364 46,434 46,224 45,732 45,381 47,136 45,030 47,838 46,224 46,645 44,328

4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO


CLASE E, 2500 PSI
ML 16,739 17,985 18,055 18,090 17,985 17,739 17,564 18,441 17,388 18,792 17,985 18,196 17,037

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE


4.35 *** REFUERZO (RESISTENCIA ÚLTIMA 25 KN)
M2 10,341 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,598 10,598

SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO


4.36 *** BX-50 M2 14,685 15,083 15,083 15,083 15,083 15,083 15,083 15,083 15,083 15,083 15,083 15,083 15,083

SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO


4.37 *** BX-75
M2 19,715 20,278 20,278 20,278 20,278 20,278 20,278 20,278 20,278 20,278 20,278 20,278 20,278

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE


4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN)
M2 23,606 24,297 24,297 24,297 24,297 24,297 24,297 24,297 24,297 24,297 24,297 24,297 24,297

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE


4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN)
M2 30,292 31,203 31,203 31,203 31,203 31,203 31,203 31,203 31,203 31,203 31,203 31,203 31,203
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800


4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 7,421 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606 7,606

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 8,442 8,661 8,661 8,661 8,661 8,661 8,661 8,661 8,661 8,661 8,661 8,661 8,661

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 8,771 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700


4.43 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 6,277 6,425 6,425 6,425 6,425 6,425 6,425 6,425 6,425 6,425 6,425 6,425 6,425

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100


4.44 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 9,404 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400


4.45 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 7,688 7,880 7,880 7,880 7,880 7,880 7,880 7,880 7,880 7,880 7,880 7,880 7,880

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400


4.46 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 9,404 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653 9,653

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000


4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 17,976 18,506 18,506 18,506 18,506 18,506 18,506 18,506 18,506 18,506 18,506 18,506 18,506

4.48 661.1 SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO


REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML 640,809 659,504 659,536 659,553 659,504 659,389 659,307 659,717 659,225 659,880 659,504 659,602 659,062
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
4.49 660.3 DIÁMETRO 600 MM
ML 366,600 383,920 384,419 384,669 383,920 382,170 380,920 387,169 379,670 389,669 383,920 385,419 377,170
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-
4.50 *** ALCANTARILLADO, DIÁMETRO 36"
ML 894,999 921,729 921,729 921,729 921,729 921,729 921,729 921,729 921,729 921,729 921,729 921,729 921,729

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 149,022 167,039 172,109 151,829 150,139 145,069 141,689 155,209 134,929 178,869 148,449 146,759 116,339

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO


4.52 640.1 60000 PSI KG 4,505 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631 4,631

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE


4.53 *** SUMINISTRO E INSTALACIÓN)
ML 87,029 89,691 89,691 89,691 89,691 89,691 89,691 89,691 89,691 89,691 89,691 89,691 89,691

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE


4.54 *** SUMINISTRO E INSTALACIÓN)
ML 132,554 136,644 136,644 136,644 136,644 136,644 136,644 136,644 136,644 136,644 136,644 136,644 136,644

4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 537,401 579,018 581,396 582,584 579,018 570,696 564,751 594,474 558,807 606,363 579,018 586,151 546,918
4.56 682.1 P COLCHONETA RENO M3 229,480 230,870 239,387 223,772 220,933 216,674 210,995 225,191 208,156 245,066 219,513 236,548 192,541
4.57 *** TRINCHO EN MADERA M2 68,951 71,008 71,008 71,008 71,008 71,008 71,008 71,008 71,008 71,008 71,008 71,008 71,008

NORMA SEÑALIZACIÓN
5 INV
5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 4,091 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221 4,221
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 44,236 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350 45,350
5.3 730.3 TOPE DEFENSA METÁLICA UN 84,918 87,504 87,504 87,504 87,504 87,504 87,504 87,504 87,504 87,504 87,504 87,504 87,504
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 70,693 72,813 72,813 72,813 72,813 72,813 72,813 72,813 72,813 72,813 72,813 72,813 72,813
5.5 730.1 DEFENSA METÁLICA ML 149,872 155,543 155,646 155,697 155,543 155,182 154,924 156,213 154,666 156,728 155,543 155,852 154,151
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
UNIDIRECCIONALES
UN 13,787 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165 14,165

NORMA MANTENIMIENTO VIAL


6 INV
6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 858 866 866 866 866 866 866 866 866 866 866 866 866
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL
6.2 801.6 A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE UN 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847
SOBRANTES A UNA DISTANCIA DE 5 KM
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE ACTIVIDADES CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)

PROVINCIA: GUALIVÁ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD Municipio Albán La_Peña La_Vega Nimaima Nocaima Quebrada_Negra San_Francisco Sasaima Supatá Útica Vergara Villeta
LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE
6.3 801.7 RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA ML 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067
DISTANCIA DE 5 KM
6.4 211.1 REMOCIÓN DE DERRUMBES M3 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA
DE 5 KM)
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
HA 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470

6.6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE


RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 1,856 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 15,798 15,670 15,670 15,670 15,670 15,670 15,670 15,670 15,670 15,670 15,670 15,670 15,670
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 25,451 25,382 25,382 25,382 25,382 25,382 25,382 25,382 25,382 25,382 25,382 25,382 25,382
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 10,279 9,588 9,588 9,588 9,588 9,588 9,588 9,588 9,588 9,588 9,588 9,588 9,588

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO
DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
CONSTRUCCIÓNp
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,167,399 2,138,482 2,150,205 2,172,868 2,181,466 2,150,205 2,193,189 2,158,020
1.2 CAMPAMENTO 9 M2 UN ### 1,262,274 1,247,815 1,253,677 1,265,009 1,269,307 1,253,677 1,275,169 1,257,584
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 15,207 15,207 15,207 15,207 15,207 15,207 15,207 15,207
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 17,050 17,050 17,050 17,050 17,050 17,050 17,050 17,050
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,707 19,707 19,707 19,707 19,707 19,707 19,707 19,707
1.6 CERCA EN TABLA H=2.30 M ML ### 71,336 71,336 71,336 71,336 71,336 71,336 71,336 71,336
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 50,108 49,790 49,919 50,168 50,262 49,919 50,391 50,005
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 23,177 22,859 22,988 23,237 23,331 22,988 23,460 23,074
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 983,225 978,259 979,546 982,333 982,978 979,845 984,265 981,101
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 11,175 11,175 11,175 11,175 11,175 11,175 11,175 11,175
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 4,078 4,078 4,078 4,078 4,078 4,078 4,078 4,078
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,924,111 2,924,111 2,924,111 2,924,111 2,924,111 2,924,111 2,924,111 2,924,111
1.44 RED TELEFÓNICA PROVISIONAL UN ### 269,893 269,893 269,893 269,893 269,893 269,893 269,893 269,893
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 108,739 77,102 77,102 82,375 77,102 82,375 77,102 89,405
2.2 BASE ARENA CEMENTO 1:20 M3 ### 233,310 201,241 214,242 239,377 248,911 214,242 261,912 222,910
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ###
p 24,063 24,063 24,063 24,063 24,063 24,063 24,063 24,063
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### i 692,137 661,073 673,666 698,014 707,250 673,666 719,843 682,062
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### o 694,961 662,619 675,729 701,078 710,694 675,729 723,806 684,471
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 646,693 616,409 628,685 652,421 661,425 628,685 673,702 636,871
2.9 PILOTE DE MADERA D=20 CM ML ### 51,644 51,644 51,644 51,644 51,644 51,644 51,644 51,644
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.10 MENOR DE 5 KM)
ML ### 159,576 159,576 159,576 159,576 159,576 159,576 159,576 159,576

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA


2.11 MENOR DE 5 KM)
ML ### 200,859 200,859 200,859 200,859 200,859 200,859 200,859 200,859

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA


2.12 MENOR DE 5 KM)
ML ### 250,783 250,783 250,783 250,783 250,783 250,783 250,783 250,783

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA


2.13 MENOR DE 5 KM)
ML ### 317,989 317,989 317,989 317,989 317,989 317,989 317,989 317,989
2.14 PILOTE HINCADO 25X25 ML ### 111,364 109,145 110,045 111,784 112,443 110,045 113,343 110,644
2.15 PILOTE HINCADO 30X30 ML ### 138,108 134,892 136,196 138,716 139,672 136,196 140,976 137,065
2.16 DADOS EN CONCRETO 3500PSI M3 ### 631,695 601,411 613,687 637,422 646,427 613,687 658,704 621,873
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.17 KM) ML ### 95,722 95,722 95,722 95,722 95,722 95,722 95,722 95,722

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 41,634 41,435 41,516 41,672 41,731 41,516 41,812 41,569
3.2 SIFÓN EN PVC 6" UN ### 215,976 215,777 215,858 216,014 216,073 215,858 216,154 215,911
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 499,367 472,717 477,494 489,208 490,234 479,972 495,011 486,460
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 244,007 239,016 240,531 243,669 244,572 240,740 246,087 242,029
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 278,567 270,398 272,911 278,098 279,613 273,239 282,126 275,353
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 366,506 354,002 358,272 366,857 369,661 358,601 373,931 361,886
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 112,022 111,843 111,843 111,872 111,843 111,872 111,843 111,912
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,400,153 1,398,362 1,398,362 1,398,661 1,398,362 1,398,661 1,398,362 1,399,059
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 126,197 123,996 124,888 126,613 127,267 124,888 128,160 125,483
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 79,742 78,581 79,052 79,962 80,307 79,052 80,778 79,366
3.11 TUBERÍA DRENAJE PVC 110 ML ### 30,149 29,629 29,840 30,248 30,402 29,840 30,613 29,981
3.12 TUBERÍA DRENAJE PVC 160 ML ### 48,705 48,185 48,396 48,804 48,958 48,396 49,169 48,537
3.13 TUBERÍA DRENAJE PVC 200 ML ### 63,964 63,236 63,532 64,102 64,319 63,532 64,614 63,728
3.14 TUBERÍA DRENAJE PVC 250 ML ### 87,646 86,813 87,151 87,803 88,050 87,151 88,388 87,376
3.15 TUBERÍA DRENAJE PVC 315 ML ### 121,412 120,684 120,979 121,550 121,767 120,979 122,062 121,176
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,042,697 1,034,376 1,037,749 1,044,271 1,046,745 1,037,749 1,050,119 1,039,998

3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,474,868 1,458,226 1,464,972 1,478,016 1,482,964 1,464,972 1,489,712 1,469,471

3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,921,358 1,888,073 1,901,566 1,927,654 1,937,550 1,901,566 1,951,044 1,910,563

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 45,860 45,860 45,860 45,860 45,860 45,860 45,860 45,860
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 60,625 60,625 60,625 60,625 60,625 60,625 60,625 60,625
4.3 COLUMNAS 3500 PSI M3 ### 867,901 837,617 849,893 873,629 882,633 849,893 894,910 858,079
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 267,730 254,877 251,205 264,990 271,371 251,623 283,530 258,336
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI
M2 ### 106,801 103,861 105,053 107,357 108,231 105,053 109,423 105,847

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI
M2 ### 126,026 122,497 123,928 126,693 127,742 123,928 129,172 124,881
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 139,559 134,854 136,761 140,448 141,847 136,761 143,754 138,033
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 147,261 142,263 144,289 148,207 149,693 144,289 151,719 145,640
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 168,825 162,651 165,154 169,993 171,829 165,154 174,332 166,823
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 187,822 180,766 183,626 189,157 191,255 183,626 194,116 185,533
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 208,458 200,520 203,738 209,960 212,320 203,738 215,538 205,883
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
4.12 ENTREPISO VIGUETA PLACA M2 ###
p 107,964 107,464 107,667 108,059 108,208 107,667 108,411 107,802
4.13 ESCALERA MACIZA 3500 PSI M3 ### i 1,029,406 999,121 1,011,398 1,035,133 1,044,138 1,011,398 1,056,415 1,019,583
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### o 103,847 103,394 103,578 103,933 104,068 103,578 104,252 103,701
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 85,229 82,201 83,428 85,802 86,702 83,428 87,930 84,247
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 95,950 92,245 93,747 96,650 97,752 93,747 99,254 94,748
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 111,836 107,190 109,073 112,714 114,095 109,073 115,979 110,329
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 759,710 729,426 741,703 765,438 774,442 741,703 786,720 749,888
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 53,022 52,084 52,464 53,200 53,479 52,464 53,860 52,718
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 301,708 288,183 293,666 304,266 308,287 293,666 313,771 297,321
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,563 4,563 4,563 4,563 4,563 4,563 4,563 4,563
4.22 ACERO FIGURADO 60000 PSI KG ### 4,785 4,785 4,785 4,785 4,785 4,785 4,785 4,785
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,669 6,669 6,669 6,669 6,669 6,669 6,669 6,669
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 916,464 886,180 898,456 922,192 931,196 898,456 943,473 906,642
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 835,146 802,005 815,440 841,415 851,268 815,440 864,704 824,398
4.26 VIGA AÉREA 3500 PSI M3 ### 908,134 877,850 890,127 913,862 922,866 890,127 935,144 898,312
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 886,864 856,580 868,857 892,592 901,596 868,857 913,874 877,042
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,110,281 1,079,997 1,092,274 1,116,009 1,125,013 1,092,274 1,137,291 1,100,459
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 346,345 313,251 326,667 352,604 362,444 326,667 375,860 335,612

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 31,972 31,147 31,481 32,128 32,373 31,481 32,708 31,704
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 53,617 52,792 53,127 53,773 54,019 53,127 54,353 53,350
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 37,832 37,633 37,714 37,870 37,929 37,714 38,010 37,768
5.4 ARCOS EN LADRILLO PRENSADO ML ### 176,760 176,362 176,524 176,836 176,954 176,524 177,116 176,631
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 47,477 46,539 46,919 47,655 47,934 46,919 48,314 47,173
5.6 DINTELES EN BLOQUE 0.15 M ML ### 29,424 28,971 29,155 29,510 29,645 29,155 29,828 29,277
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 108,322 107,525 107,848 108,473 108,710 107,848 109,033 108,064
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 98,496 95,367 96,635 99,087 100,018 96,635 101,286 97,481
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 99,036 99,036 99,036 99,036 99,036 99,036 99,036 99,036
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 57,917 57,917 57,917 57,917 57,917 57,917 57,917 57,917
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 95,338 95,338 95,338 95,338 95,338 95,338 95,338 95,338
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 56,068 56,068 56,068 56,068 56,068 56,068 56,068 56,068
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 110,800 110,800 110,800 110,800 110,800 110,800 110,800 110,800
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 65,200 65,200 65,200 65,200 65,200 65,200 65,200 65,200
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 123,348 123,348 123,348 123,348 123,348 123,348 123,348 123,348
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 71,474 71,474 71,474 71,474 71,474 71,474 71,474 71,474
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 44,365 43,964 44,126 44,440 44,559 44,126 44,722 44,235
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 26,755 26,555 26,636 26,793 26,852 26,636 26,933 26,690
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 57,837 57,570 57,678 57,887 57,966 57,678 58,075 57,750
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 34,620 34,487 34,541 34,646 34,685 34,541 34,739 34,577
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 65,024 64,757 64,865 65,074 65,154 64,865 65,262 64,937
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 38,928 38,794 38,848 38,953 38,993 38,848 39,047 38,884
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 108,566 107,231 107,772 108,818 109,215 107,772 109,756 108,133
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 63,907 63,239 63,510 64,033 64,231 63,510 64,502 63,690
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 40,571 40,304 40,412 40,622 40,701 40,412 40,809 40,485
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 24,505 24,372 24,426 24,530 24,570 24,426 24,624 24,462
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 80,878 80,344 80,560 80,979 81,138 80,560 81,354 80,705
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 48,560 48,293 48,401 48,610 48,690 48,401 48,798 48,473
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 96,061 95,608 95,792 96,147 96,282 95,792 96,465 95,914
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 57,929 57,703 57,795 57,972 58,040 57,795 58,131 57,856
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 199,408 197,540 198,297 199,762 200,317 198,297 201,074 198,802
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 119,202 118,267 118,646 119,378 119,656 118,646 120,035 118,899
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 98,045 97,215 97,551 98,202 98,449 97,551 98,786 97,776
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 58,921 58,506 58,674 59,000 59,123 58,674 59,292 58,787
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ###
p 51,265 50,668 50,910 51,378 51,556 50,910 51,798 51,072
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### i 31,037 30,738 30,860 31,094 31,183 30,860 31,304 30,940
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### o 36,759 36,492 36,600 36,809 36,889 36,600 36,997 36,672
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 22,307 22,174 22,228 22,333 22,372 22,228 22,426 22,264
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 55,817 55,284 55,500 55,918 56,077 55,500 56,294 55,644
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 34,037 33,770 33,878 34,087 34,166 33,878 34,275 33,950
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 107,638 106,838 107,162 107,790 108,028 107,162 108,353 107,379
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 65,212 64,812 64,974 65,288 65,407 64,974 65,569 65,082
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 78,488 77,954 78,170 78,589 78,748 78,170 78,964 78,315
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 47,197 46,931 47,039 47,248 47,327 47,039 47,435 47,111
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 165,638 163,770 164,527 165,991 166,547 164,527 167,304 165,032
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 100,227 99,293 99,672 100,404 100,681 99,672 101,060 99,924
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 34,507 34,308 34,389 34,545 34,604 34,389 34,685 34,443
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 39,665 39,067 39,309 39,778 39,955 39,309 40,198 39,471
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 66,902 66,105 66,428 67,053 67,290 66,428 67,613 66,644
5.50 LAVADA DE FACHADA M2 ### 5,583 5,583 5,583 5,583 5,583 5,583 5,583 5,583
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 54,005 53,180 53,515 54,161 54,407 53,515 54,741 53,738
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,232 11,232 11,232 11,232 11,232 11,232 11,232 11,232
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,893 14,893 14,893 14,893 14,893 14,893 14,893 14,893
5.54 ANCLAJE 1/2" L=50CM UN ### 19,474 19,474 19,474 19,474 19,474 19,474 19,474 19,474
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 27,341 27,341 27,341 27,341 27,341 27,341 27,341 27,341
5.56 ANCLAJE 3/4" L=70CM UN ### 40,878 40,878 40,878 40,878 40,878 40,878 40,878 40,878
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,292 5,066 5,158 5,334 5,401 5,158 5,492 5,219

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,239 17,239 17,239 17,239 17,239 17,239 17,239 17,239
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,272 6,073 6,154 6,310 6,369 6,154 6,450 6,208
6.3 FILOS O DILATACIONES S/MURO ML ### 7,529 7,330 7,411 7,567 7,626 7,411 7,707 7,465
6.4 GOTERA EN MORTERO 1:4 ML ### 8,918 8,719 8,799 8,956 9,015 8,799 9,096 8,853
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,406 7,406 7,406 7,406 7,406 7,406 7,406 7,406
6.6 MALLA BAJO ENTRAMADO M2 ### 14,678 14,678 14,678 14,678 14,678 14,678 14,678 14,678
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 26,172 25,590 25,826 26,282 26,455 25,826 26,690 25,983
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,836 15,545 15,663 15,891 15,977 15,663 16,095 15,741
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,985 22,425 22,652 23,091 23,258 22,652 23,485 22,803
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,913 13,633 13,747 13,966 14,050 13,747 14,163 13,823
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 22,047 21,466 21,701 22,157 22,330 21,701 22,566 21,859
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,444 13,154 13,272 13,499 13,586 13,272 13,704 13,350
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,985 22,425 22,652 23,091 23,258 22,652 23,485 22,803
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,913 13,633 13,747 13,966 14,050 13,747 14,163 13,823
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 23,371 22,957 23,125 23,450 23,573 23,125 23,741 23,237
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 14,105 13,898 13,982 14,145 14,206 13,982 14,290 14,038
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 19,084 18,657 18,830 19,164 19,291 18,830 19,465 18,945
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,657 11,443 11,530 11,697 11,761 11,530 11,847 11,588
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 18,369 17,926 18,106 18,453 18,585 18,106 18,764 18,225
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,300 11,078 11,168 11,342 11,407 11,168 11,497 11,228
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 23,810 23,249 23,477 23,916 24,083 23,477 24,310 23,628
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 14,305 14,024 14,138 14,358 14,441 14,138 14,555 14,214
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 22,872 22,291 22,526 22,982 23,155 22,526 23,391 22,684
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,836 13,545 13,663 13,891 13,977 13,663 14,095 13,741
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 19,016 18,573 18,753 19,100 19,232 18,753 19,411 18,872
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,604 11,383 11,473 11,646 11,712 11,473 11,802 11,532
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 23,815 23,233 23,469 23,925 24,098 23,469 24,333 23,626
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,736 14,445 14,563 14,791 14,877 14,563 14,995 14,641
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
7 CUBIERTAS
p
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### i 29,301 28,500 28,824 29,452 29,690 28,824 30,015 29,041
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA o
7.2 IMPERMEABLE)
M2 ### 90,245 88,680 89,315 90,541 91,006 89,315 91,640 89,738
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 60,250 60,250 60,250 60,250 60,250 60,250 60,250 60,250
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,958 23,958 23,958 23,958 23,958 23,958 23,958 23,958
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 37,640 37,640 37,640 37,640 37,640 37,640 37,640 37,640
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 88,086 88,086 88,086 88,086 88,086 88,086 88,086 88,086
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 68,944 68,944 68,944 68,944 68,944 68,944 68,944 68,944
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 40,039 40,039 40,039 40,039 40,039 40,039 40,039 40,039
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 92,323 92,323 92,323 92,323 92,323 92,323 92,323 92,323
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 110,267 110,267 110,267 110,267 110,267 110,267 110,267 110,267
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 162,116 162,116 162,116 162,116 162,116 162,116 162,116 162,116
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 63,938 63,938 63,938 63,938 63,938 63,938 63,938 63,938
7.13 CANAL PVC AMAZONAS ML ### 88,778 88,778 88,778 88,778 88,778 88,778 88,778 88,778
7.14 CANAL PVC RAINGO ML ### 80,682 80,682 80,682 80,682 80,682 80,682 80,682 80,682
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 143,464 143,464 143,464 143,464 143,464 143,464 143,464 143,464
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 83,822 83,822 83,822 83,822 83,822 83,822 83,822 83,822
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 61,545 61,545 61,545 61,545 61,545 61,545 61,545 61,545
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 34,943 34,943 34,943 34,943 34,943 34,943 34,943 34,943
7.19000000000001 TEJA DE BARRO M2 ### 64,713 63,717 64,121 64,902 65,198 64,121 65,601 64,390
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 51,310 51,310 51,310 51,310 51,310 51,310 51,310 51,310
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 47,032 47,032 47,032 47,032 47,032 47,032 47,032 47,032
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 39,594 39,594 39,594 39,594 39,594 39,594 39,594 39,594
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 38,775 38,775 38,775 38,775 38,775 38,775 38,775 38,775
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 39,069 39,069 39,069 39,069 39,069 39,069 39,069 39,069
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 55,055 55,055 55,055 55,055 55,055 55,055 55,055 55,055
7.26 TEJA PLÁSTICA No.6 M2 ### 48,388 48,388 48,388 48,388 48,388 48,388 48,388 48,388
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 88,642 88,642 88,642 88,642 88,642 88,642 88,642 88,642
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 163,786 163,786 163,786 163,786 163,786 163,786 163,786 163,786
7.29000000000001 TEJA SIN TRASLAPO M2 ### 73,589 73,589 73,589 73,589 73,589 73,589 73,589 73,589
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 45,943 45,943 45,943 45,943 45,943 45,943 45,943 45,943
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 36,030 36,030 36,030 36,030 36,030 36,030 36,030 36,030
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO
7.32 4"x2", 15 MM) M2 ### 62,965 62,965 62,965 62,965 62,965 62,965 62,965 62,965
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,589 21,589 21,589 21,589 21,589 21,589 21,589 21,589
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 26,001 26,001 26,001 26,001 26,001 26,001 26,001 26,001
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 28,196 28,196 28,196 28,196 28,196 28,196 28,196 28,196
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 36,342 36,342 36,342 36,342 36,342 36,342 36,342 36,342
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,955 23,955 23,955 23,955 23,955 23,955 23,955 23,955
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 56,416 56,416 56,416 56,416 56,416 56,416 56,416 56,416
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 388,332 388,332 388,332 388,332 388,332 388,332 388,332 388,332
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 439,298 439,298 439,298 439,298 439,298 439,298 439,298 439,298
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 294,535 294,535 294,535 294,535 294,535 294,535 294,535 294,535
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 314,860 314,860 314,860 314,860 314,860 314,860 314,860 314,860

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 492,871 460,713 473,750 498,953 508,514 473,750 521,551 482,441
8.2 CONCRETO 3500 PSI M3 ### 429,783 400,381 412,300 435,344 444,086 412,300 456,006 420,247
8.3 CONCRETO 3000 PSI M3 ### 426,652 396,492 408,719 432,357 441,324 408,719 453,551 416,870
8.4 CONCRETO 2500 PSI M3 ### 380,267 348,978 361,663 386,185 395,487 361,663 408,172 370,119
8.5 CONCRETO 2000 PSI M3 ### 353,885 322,139 335,009 359,890 369,329 335,009 382,198 343,589
8.6 CONCRETO 1500 PSI M3 ### 320,240 288,110 301,135 326,317 335,870 301,135 348,895 309,819
8.7 MORTERO SECO 1:10 M3 ### 276,916 249,428 260,572 282,116 290,288 260,572 301,432 268,001
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 505,316 478,624 489,445 510,365 518,300 489,445 529,121 496,659
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ###
p 460,653 432,966 444,190 465,891 474,122 444,190 485,347 451,674
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### i 526,712 500,817 511,314 531,610 539,309 511,314 549,806 518,314
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### o 773,292 747,397 757,894 778,190 785,889 757,894 796,386 764,894

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 133,840 133,840 133,840 133,840 133,840 133,840 133,840 133,840
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,422 4,222 4,303 4,459 4,519 4,303 4,599 4,357
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 149,643 149,643 149,643 149,643 149,643 149,643 149,643 149,643
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 183,398 183,398 183,398 183,398 183,398 183,398 183,398 183,398
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 267,135 267,135 267,135 267,135 267,135 267,135 267,135 267,135
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 297,361 297,361 297,361 297,361 297,361 297,361 297,361 297,361
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 327,621 327,621 327,621 327,621 327,621 327,621 327,621 327,621
9.8 HOJA PUERTA FORTEC 0.81 UN ### 217,651 217,651 217,651 217,651 217,651 217,651 217,651 217,651
9.9 HOJA PUERTA FORTEC 0.91 UN ### 246,770 246,770 246,770 246,770 246,770 246,770 246,770 246,770
9.10 HOJA PUERTA FORTEC 1.50 UN ### 363,248 363,248 363,248 363,248 363,248 363,248 363,248 363,248
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 137,572 137,572 137,572 137,572 137,572 137,572 137,572 137,572
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 182,707 182,707 182,707 182,707 182,707 182,707 182,707 182,707
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 203,091 203,091 203,091 203,091 203,091 203,091 203,091 203,091
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 517,582 517,582 517,582 517,582 517,582 517,582 517,582 517,582
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 45,690 45,690 45,690 45,690 45,690 45,690 45,690 45,690
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 28,382 28,382 28,382 28,382 28,382 28,382 28,382 28,382
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 108,004 108,004 108,004 108,004 108,004 108,004 108,004 108,004
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 132,355 132,355 132,355 132,355 132,355 132,355 132,355 132,355
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 102,798 102,798 102,798 102,798 102,798 102,798 102,798 102,798
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 31,805 31,805 31,805 31,805 31,805 31,805 31,805 31,805
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 31,805 31,805 31,805 31,805 31,805 31,805 31,805 31,805
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 30,145 30,145 30,145 30,145 30,145 30,145 30,145 30,145
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 46,079 46,079 46,079 46,079 46,079 46,079 46,079 46,079
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 57,108 57,108 57,108 57,108 57,108 57,108 57,108 57,108
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 68,872 68,872 68,872 68,872 68,872 68,872 68,872 68,872
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 82,843 82,843 82,843 82,843 82,843 82,843 82,843 82,843
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 390,731 390,731 390,731 390,731 390,731 390,731 390,731 390,731
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 273,088 273,088 273,088 273,088 273,088 273,088 273,088 273,088
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 36,521 36,521 36,521 36,521 36,521 36,521 36,521 36,521
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 46,814 46,814 46,814 46,814 46,814 46,814 46,814 46,814
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 57,108 57,108 57,108 57,108 57,108 57,108 57,108 57,108
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 71,814 71,814 71,814 71,814 71,814 71,814 71,814 71,814

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 82,630 82,630 82,630 82,630 82,630 82,630 82,630 82,630
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 230,506 230,506 230,506 230,506 230,506 230,506 230,506 230,506
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 87,384 87,384 87,384 87,384 87,384 87,384 87,384 87,384
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 156,048 156,048 156,048 156,048 156,048 156,048 156,048 156,048
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 148,227 148,227 148,227 148,227 148,227 148,227 148,227 148,227
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 97,310 97,310 97,310 97,310 97,310 97,310 97,310 97,310
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 229,518 229,518 229,518 229,518 229,518 229,518 229,518 229,518
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 119,452 119,452 119,452 119,452 119,452 119,452 119,452 119,452
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 7,160 7,160 7,160 7,160 7,160 7,160 7,160 7,160
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL
10.10 GALVANIZADO 2")
M2 ### 107,527 107,527 107,527 107,527 107,527 107,527 107,527 107,527

10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 131,529 131,529 131,529 131,529 131,529 131,529 131,529 131,529
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 44,285 44,285 44,285 44,285 44,285 44,285 44,285 44,285
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 588,021 588,021 588,021 588,021 588,021 588,021 588,021 588,021
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ###
p 211,256 211,256 211,256 211,256 211,256 211,256 211,256 211,256
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### i 236,675 236,675 236,675 236,675 236,675 236,675 236,675 236,675
o
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS)
M2 ### 535,906 535,906 535,906 535,906 535,906 535,906 535,906 535,906
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 138,915 138,915 138,915 138,915 138,915 138,915 138,915 138,915
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 428,946 428,946 428,946 428,946 428,946 428,946 428,946 428,946
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,544 6,544 6,544 6,544 6,544 6,544 6,544 6,544
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 301,401 301,401 301,401 301,401 301,401 301,401 301,401 301,401
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 132,324 132,324 132,324 132,324 132,324 132,324 132,324 132,324
10.21 REJILLA PISO 0.30 M M2 ### 93,686 93,686 93,686 93,686 93,686 93,686 93,686 93,686
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 96,652 96,652 96,652 96,652 96,652 96,652 96,652 96,652

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,


10.23 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 11,366 11,366 11,366 11,366 11,366 11,366 11,366 11,366
PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,


10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 12,629 12,629 12,629 12,629 12,629 12,629 12,629 12,629
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10.25 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,008 10,008 10,008 10,008 10,008 10,008 10,008 10,008
SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 239,180 239,180 239,180 239,180 239,180 239,180 239,180 239,180
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 288,861 288,861 288,861 288,861 288,861 288,861 288,861 288,861
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,958 23,958 23,958 23,958 23,958 23,958 23,958 23,958
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 37,640 37,640 37,640 37,640 37,640 37,640 37,640 37,640
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 36,068 36,068 36,068 36,068 36,068 36,068 36,068 36,068
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 46,281 46,281 46,281 46,281 46,281 46,281 46,281 46,281
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 95,530 95,530 95,530 95,530 95,530 95,530 95,530 95,530
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 240,664 240,664 240,664 240,664 240,664 240,664 240,664 240,664
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,981 46,981 46,981 46,981 46,981 46,981 46,981 46,981
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 37,910 37,910 37,910 37,910 37,910 37,910 37,910 37,910
11.13 NIPLE PASAMURO 2" UN ### 71,940 71,940 71,940 71,940 71,940 71,940 71,940 71,940
11.14 NIPLE PASAMURO 4" UN ### 107,554 107,554 107,554 107,554 107,554 107,554 107,554 107,554
11.15 PUNTO AGUA CALIENTE CPVC UN ### 90,934 90,934 90,934 90,934 90,934 90,934 90,934 90,934
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 66,127 66,127 66,127 66,127 66,127 66,127 66,127 66,127
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 70,387 70,387 70,387 70,387 70,387 70,387 70,387 70,387
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 88,955 88,955 88,955 88,955 88,955 88,955 88,955 88,955
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 71,829 71,829 71,829 71,829 71,829 71,829 71,829 71,829
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 90,020 90,020 90,020 90,020 90,020 90,020 90,020 90,020
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 96,323 96,323 96,323 96,323 96,323 96,323 96,323 96,323
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 80,007 80,007 80,007 80,007 80,007 80,007 80,007 80,007
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,542 13,542 13,542 13,542 13,542 13,542 13,542 13,542
11.24 RED SUMINISTRO CPVC 3/4" ML ### 19,094 19,094 19,094 19,094 19,094 19,094 19,094 19,094
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 24,924 24,924 24,924 24,924 24,924 24,924 24,924 24,924
11.26 RED SUMINISTRO PVC 1" ML ### 15,379 15,379 15,379 15,379 15,379 15,379 15,379 15,379
11.27 RED SUMINISTRO PVC 1/2" ML ### 9,176 9,176 9,176 9,176 9,176 9,176 9,176 9,176
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 55,588 55,588 55,588 55,588 55,588 55,588 55,588 55,588
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
11.29 RED SUMINISTRO PVC 2" ML ###
p 35,537 35,537 35,537 35,537 35,537 35,537 35,537 35,537
11.30 RED SUMINISTRO PVC 3/4" ML ### i 11,498 11,498 11,498 11,498 11,498 11,498 11,498 11,498
11.31 RED SANITARIA PVC-S 2" ML ### o 27,424 27,424 27,424 27,424 27,424 27,424 27,424 27,424
11.32 RED SANITARIA PVC-S 3" ML ### 38,070 38,070 38,070 38,070 38,070 38,070 38,070 38,070
11.33 RED SANITARIA PVC-S 4" ML ### 51,677 51,677 51,677 51,677 51,677 51,677 51,677 51,677
11.34 RED SANITARIA PVC-S 6" ML ### 96,748 96,748 96,748 96,748 96,748 96,748 96,748 96,748
11.35 REGISTRO 1" UN ### 117,359 117,359 117,359 117,359 117,359 117,359 117,359 117,359
11.36 REGISTRO 1/2" UN ### 65,402 65,402 65,402 65,402 65,402 65,402 65,402 65,402
11.37 REGISTRO 3/4" UN ### 83,339 83,339 83,339 83,339 83,339 83,339 83,339 83,339
11.38 REGISTRO 1 1/2" UN ### 201,515 201,515 201,515 201,515 201,515 201,515 201,515 201,515
11.39 REGISTRO 2 1/2" UN ### 415,872 415,872 415,872 415,872 415,872 415,872 415,872 415,872
11.40 REGISTRO 2" UN ### 307,134 307,134 307,134 307,134 307,134 307,134 307,134 307,134
11.41 REVENTILACIÓN 2" ML ### 19,105 19,105 19,105 19,105 19,105 19,105 19,105 19,105
11.42 REVENTILACIÓN 3" ML ### 24,117 24,117 24,117 24,117 24,117 24,117 24,117 24,117
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 187,621 187,621 187,621 187,621 187,621 187,621 187,621 187,621
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 305,682 305,682 305,682 305,682 305,682 305,682 305,682 305,682
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 508,900 508,900 508,900 508,900 508,900 508,900 508,900 508,900
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 43,869 43,869 43,869 43,869 43,869 43,869 43,869 43,869

11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 51,765 51,765 51,765 51,765 51,765 51,765 51,765 51,765

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 66,217 66,217 66,217 66,217 66,217 66,217 66,217 66,217

11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 75,372 75,372 75,372 75,372 75,372 75,372 75,372 75,372

11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 97,186 97,186 97,186 97,186 97,186 97,186 97,186 97,186

11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 112,111 112,111 112,111 112,111 112,111 112,111 112,111 112,111

11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 165,542 165,542 165,542 165,542 165,542 165,542 165,542 165,542
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 66,765 66,765 66,765 66,765 66,765 66,765 66,765 66,765
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 67,040 67,040 67,040 67,040 67,040 67,040 67,040 67,040
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 43,263 43,263 43,263 43,263 43,263 43,263 43,263 43,263
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 53,396 53,396 53,396 53,396 53,396 53,396 53,396 53,396
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,525 4,525 4,525 4,525 4,525 4,525 4,525 4,525
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 7,147 7,147 7,147 7,147 7,147 7,147 7,147 7,147
11.59 GABINETE TIPO III UN ### 1,103,252 1,103,252 1,103,252 1,103,252 1,103,252 1,103,252 1,103,252 1,103,252
11.60 GABINETE TIPO I UN ### 841,467 841,467 841,467 841,467 841,467 841,467 841,467 841,467
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,845,722 2,845,722 2,845,722 2,845,722 2,845,722 2,845,722 2,845,722 2,845,722
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,372,145 2,372,145 2,372,145 2,372,145 2,372,145 2,372,145 2,372,145 2,372,145
11.63 VÁLVULA MARIPOSA 3" UN ### 686,422 686,422 686,422 686,422 686,422 686,422 686,422 686,422
11.64 VÁLVULA MARIPOSA 4" UN ### 889,094 889,094 889,094 889,094 889,094 889,094 889,094 889,094
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 343,170 343,170 343,170 343,170 343,170 343,170 343,170 343,170

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 395,923 395,923 395,923 395,923 395,923 395,923 395,923 395,923
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 62,910 62,910 62,910 62,910 62,910 62,910 62,910 62,910
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 74,505 74,505 74,505 74,505 74,505 74,505 74,505 74,505
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 82,681 82,681 82,681 82,681 82,681 82,681 82,681 82,681
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 97,423 97,423 97,423 97,423 97,423 97,423 97,423 97,423
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 59,124 59,124 59,124 59,124 59,124 59,124 59,124 59,124
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 67,410 67,410 67,410 67,410 67,410 67,410 67,410 67,410
12.8 STRIP TELEFÓNICO 10 PARES UN ### 155,432 155,432 155,432 155,432 155,432 155,432 155,432 155,432
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 60,726 60,726 60,726 60,726 60,726 60,726 60,726 60,726
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ###
p 139,602 139,602 139,602 139,602 139,602 139,602 139,602 139,602
12.11 SALIDA T.V PVC COMPLETA. UN ### i 83,441 83,441 83,441 83,441 83,441 83,441 83,441 83,441
12.12 SALIDA BIFÁSICA C.N. UN ### o 49,491 49,491 49,491 49,491 49,491 49,491 49,491 49,491
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 104,228 104,228 104,228 104,228 104,228 104,228 104,228 104,228
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 444,949 444,949 444,949 444,949 444,949 444,949 444,949 444,949
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 592,843 592,843 592,843 592,843 592,843 592,843 592,843 592,843
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,839 3,839 3,839 3,839 3,839 3,839 3,839 3,839
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 5,068 5,068 5,068 5,068 5,068 5,068 5,068 5,068
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,890 7,890 7,890 7,890 7,890 7,890 7,890 7,890
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 14,108 14,108 14,108 14,108 14,108 14,108 14,108 14,108
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 296,544 296,544 296,544 296,544 296,544 296,544 296,544 296,544
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 83,722 83,722 83,722 83,722 83,722 83,722 83,722 83,722
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 113,451 113,451 113,451 113,451 113,451 113,451 113,451 113,451
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 46,112 46,112 46,112 46,112 46,112 46,112 46,112 46,112
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,517,180 1,517,180 1,517,180 1,517,180 1,517,180 1,517,180 1,517,180 1,517,180
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,123,894 1,123,894 1,123,894 1,123,894 1,123,894 1,123,894 1,123,894 1,123,894
12.26 POSTE METÁLICO 6M UN ### 1,408,892 1,408,892 1,408,892 1,408,892 1,408,892 1,408,892 1,408,892 1,408,892
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 656,900 656,900 656,900 656,900 656,900 656,900 656,900 656,900
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 119,688 119,688 119,688 119,688 119,688 119,688 119,688 119,688
12.29 LUMINARIA 70W SODIO UN ### 551,216 551,216 551,216 551,216 551,216 551,216 551,216 551,216
12.30 LUMINARIA 150W SODIO UN ### 689,718 689,718 689,718 689,718 689,718 689,718 689,718 689,718
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,822,346 1,822,346 1,822,346 1,822,346 1,822,346 1,822,346 1,822,346 1,822,346
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,341,874 1,341,874 1,341,874 1,341,874 1,341,874 1,341,874 1,341,874 1,341,874

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 43,426 42,430 42,834 43,615 43,911 42,834 44,315 43,103
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 43,232 42,236 42,639 43,420 43,716 42,639 44,120 42,909
13.3 ALISTADO PARA LISTÓN M2 ### 15,940 15,740 15,821 15,977 16,036 15,821 16,117 15,875
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 31,135 29,143 29,951 31,512 32,104 29,951 32,911 30,489
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 93,399 91,407 92,215 93,776 94,368 92,215 95,176 92,753
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 28,605 27,970 28,228 28,725 28,914 28,228 29,171 28,399
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 62,210 59,081 60,350 62,802 63,732 60,350 65,001 61,195
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 86,362 81,356 83,386 87,309 88,798 83,386 90,827 84,739
13.9 MANTO FIBERGLASS 600X1 M2 ### 33,088 33,088 33,088 33,088 33,088 33,088 33,088 33,088
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,924 24,924 24,924 24,924 24,924 24,924 24,924 24,924
13.11 PERMA PLY 2 CAPAS M2 ### 29,221 29,221 29,221 29,221 29,221 29,221 29,221 29,221
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 50,656 47,840 48,982 51,189 52,026 48,982 53,167 49,743
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 59,365 55,924 57,319 60,016 61,040 57,319 62,435 58,249
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 86,107 80,788 82,944 87,113 88,694 82,944 90,851 84,382
13.15 TRITURADO FINO 1/2 M3 ### 102,105 80,677 89,363 106,158 112,528 89,363 121,215 95,155
13.16 TRITURADO GRUESO 3/4 M3 ### 111,929 86,458 93,879 109,421 113,670 95,073 121,092 101,613

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 62,461 62,063 62,224 62,536 62,655 62,224 62,816 62,332
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 37,243 37,044 37,125 37,281 37,340 37,125 37,421 37,179
14.3 ADOQUÍN CONCRETO 6CM M2 ### 71,550 70,554 70,958 71,738 72,034 70,958 72,438 71,227
14.4 ADOQUÍN CONCRETO 8CM M2 ### 75,200 74,204 74,608 75,388 75,684 74,608 76,088 74,877
14.5 ADOQUÍN GRES PEATONAL M2 ### 79,848 78,852 79,255 80,036 80,332 79,255 80,736 79,525
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE
14.6 ALISTADO
M2 ### 82,454 82,056 82,217 82,530 82,648 82,217 82,809 82,325
14.7 GRAVILLA PARA GRADAS ML ### 40,042 39,635 39,800 40,119 40,240 39,800 40,405 39,910
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 179,877 178,084 178,811 180,216 180,749 178,811 181,475 179,295
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 50,159 49,145 49,556 50,351 50,652 49,556 51,063 49,830
14.10 GUARDAESCOBA EN GRANITO ML ### 47,515 47,515 47,515 47,515 47,515 47,515 47,515 47,515
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
14.11 GUARDAESCOBA EN GRAVILLA ML ###
p 11,015 10,607 10,772 11,092 11,213 10,772 11,378 10,882
14.12 GUARDAESCOBA PVC CARAMELO ML ### i 10,281 10,281 10,281 10,281 10,281 10,281 10,281 10,281
14.13 GUARDAESCOBA PVC CEDRO ML ### o 13,807 13,807 13,807 13,807 13,807 13,807 13,807 13,807
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,466 11,466 11,466 11,466 11,466 11,466 11,466 11,466
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 19,263 19,263 19,263 19,263 19,263 19,263 19,263 19,263
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 37,608 37,608 37,608 37,608 37,608 37,608 37,608 37,608
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,969 9,969 9,969 9,969 9,969 9,969 9,969 9,969
14.18 LISTÓN M.H. AMARILLO M2 ### 81,133 81,133 81,133 81,133 81,133 81,133 81,133 81,133
14.19 PASO ESCALERA GRANITO ML ### 129,579 128,185 128,750 129,843 130,258 128,750 130,823 129,127
14.20 PIRLANES ALUMINIO ML ### 8,133 8,133 8,133 8,133 8,133 8,133 8,133 8,133
14.21 PIRLANES LADRILLO ML ### 34,967 34,568 34,730 35,042 35,160 34,730 35,322 34,837
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 50,213 50,213 50,213 50,213 50,213 50,213 50,213 50,213
14.23 PISO VINILO TRÁFICO PESADO M2 ### 58,394 58,394 58,394 58,394 58,394 58,394 58,394 58,394
14.24 PULIDA LACADA PISO MADERA M2 ### 53,558 53,558 53,558 53,558 53,558 53,558 53,558 53,558
14.25 TABLETA DE GRES 25X25 M2 ### 54,172 53,774 53,935 54,247 54,366 53,935 54,527 54,043
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 60,830 60,432 60,593 60,905 61,024 60,593 61,185 60,701
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,865 11,865 11,865 11,865 11,865 11,865 11,865 11,865
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 54,390 53,792 54,035 54,503 54,681 54,035 54,923 54,196
14.29 JABONERA PORCELANA ACUARIO UN ### 22,544 22,544 22,544 22,544 22,544 22,544 22,544 22,544
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA
14.30 SIMPLE)
UN ### 135,067 135,067 135,067 135,067 135,067 135,067 135,067 135,067
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,782 10,782 10,782 10,782 10,782 10,782 10,782 10,782
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 24,587 24,587 24,587 24,587 24,587 24,587 24,587 24,587
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,732 15,732 15,732 15,732 15,732 15,732 15,732 15,732
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 15,281 15,281 15,281 15,281 15,281 15,281 15,281 15,281
14.35 REMATES BOCEL ALUMINIO ML ### 9,252 9,252 9,252 9,252 9,252 9,252 9,252 9,252
14.36 REMATES BOCEL PORCELANA ML ### 9,417 9,417 9,417 9,417 9,417 9,417 9,417 9,417
14.37 TAPA REGISTRO 20X20 UN ### 20,812 20,812 20,812 20,812 20,812 20,812 20,812 20,812
14.38 TAPA REGISTRO 6X6 UN ### 18,956 18,956 18,956 18,956 18,956 18,956 18,956 18,956
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,529 20,529 20,529 20,529 20,529 20,529 20,529 20,529
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 23,732 23,732 23,732 23,732 23,732 23,732 23,732 23,732
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 71,522 71,123 71,285 71,597 71,716 71,285 71,877 71,393
14.42 MEDIA CAÑA EN GRANITO ML ### 85,001 85,001 85,001 85,001 85,001 85,001 85,001 85,001
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,820 36,820 36,820 36,820 36,820 36,820 36,820 36,820
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,472 14,472 14,472 14,472 14,472 14,472 14,472 14,472
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 111,785 111,785 111,785 111,785 111,785 111,785 111,785 111,785
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 135,178 135,178 135,178 135,178 135,178 135,178 135,178 135,178

15 CIELO RASO
15.1 APLIQUE YESO ML ### 79,845 79,845 79,845 79,845 79,845 79,845 79,845 79,845
15.2 ARMADURA MADERA Y MALLA M2 ### 38,930 38,930 38,930 38,930 38,930 38,930 38,930 38,930
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 60,428 60,428 60,428 60,428 60,428 60,428 60,428 60,428
15.4 CIELO RASO DURACUSTIC M2 ### 74,247 74,247 74,247 74,247 74,247 74,247 74,247 74,247
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 55,377 55,377 55,377 55,377 55,377 55,377 55,377 55,377
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 102,877 102,877 102,877 102,877 102,877 102,877 102,877 102,877
15.7 CORNISAS YESO ML ### 53,619 53,619 53,619 53,619 53,619 53,619 53,619 53,619
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 113,802 113,802 113,802 113,802 113,802 113,802 113,802 113,802
15.9 MALLA CON VENA M2 ### 14,574 14,574 14,574 14,574 14,574 14,574 14,574 14,574

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
16.2 UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE p
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941
i
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE o
16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 108,739 77,102 77,102 82,375 77,102 82,375 77,102 89,405
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 108,668 85,785 95,061 112,997 119,800 95,061 129,078 101,246
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 178,866 147,229 150,745 185,897 191,169 152,502 187,654 159,533
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 97,894 66,257 66,257 71,530 66,257 71,530 66,257 78,560
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 141,265 109,628 113,143 148,295 153,568 114,901 150,053 121,931
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 175,300 143,663 147,179 182,331 187,603 148,936 184,088 155,967

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 330,897 330,897 330,897 330,897 330,897 330,897 330,897 330,897
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 976,813 976,813 976,813 976,813 976,813 976,813 976,813 976,813
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 528,971 528,971 528,971 528,971 528,971 528,971 528,971 528,971
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 152,731 152,731 152,731 152,731 152,731 152,731 152,731 152,731
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 214,273 214,273 214,273 214,273 214,273 214,273 214,273 214,273
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 198,942 198,942 198,942 198,942 198,942 198,942 198,942 198,942
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 438,846 438,846 438,846 438,846 438,846 438,846 438,846 438,846
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,123,490 1,123,490 1,123,490 1,123,490 1,123,490 1,123,490 1,123,490 1,123,490
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 318,582 318,582 318,582 318,582 318,582 318,582 318,582 318,582
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 225,385 225,385 225,385 225,385 225,385 225,385 225,385 225,385
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 89,266 89,266 89,266 89,266 89,266 89,266 89,266 89,266
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49
17.12 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 273,156 273,156 273,156 273,156 273,156 273,156 273,156 273,156

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120


17.13 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 402,738 402,738 402,738 402,738 402,738 402,738 402,738 402,738

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 9,038 9,038 9,038 9,038 9,038 9,038 9,038 9,038
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,357 3,357 3,357 3,357 3,357 3,357 3,357 3,357
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 12,004 12,004 12,004 12,004 12,004 12,004 12,004 12,004
18.4 BARNIZ SOBRE MUEBLES M2 ### 45,863 45,863 45,863 45,863 45,863 45,863 45,863 45,863
18.5 CARBURO SOBRE PAÑETES M2 ### 6,295 6,295 6,295 6,295 6,295 6,295 6,295 6,295
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 71,998 71,998 71,998 71,998 71,998 71,998 71,998 71,998
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,738 3,738 3,738 3,738 3,738 3,738 3,738 3,738
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 3,009 3,009 3,009 3,009 3,009 3,009 3,009 3,009
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 15,080 15,080 15,080 15,080 15,080 15,080 15,080 15,080
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,373 4,373 4,373 4,373 4,373 4,373 4,373 4,373
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,903 15,903 15,903 15,903 15,903 15,903 15,903 15,903
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,258 6,258 6,258 6,258 6,258 6,258 6,258 6,258
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113
18.14 ESTUCO M2 ### 7,560 7,560 7,560 7,560 7,560 7,560 7,560 7,560
18.15 ESTUCO (LINEAL) ML ### 4,728 4,728 4,728 4,728 4,728 4,728 4,728 4,728
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,775 16,775 16,775 16,775 16,775 16,775 16,775 16,775
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,379 10,379 10,379 10,379 10,379 10,379 10,379 10,379
18.18 LACA PISOS MADERA M2 ### 24,522 24,522 24,522 24,522 24,522 24,522 24,522 24,522
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900
18.20 MARMOLINA SOBRE PAÑETE M2 ### 13,248 13,248 13,248 13,248 13,248 13,248 13,248 13,248
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,572 3,572 3,572 3,572 3,572 3,572 3,572 3,572
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,634 13,634 13,634 13,634 13,634 13,634 13,634 13,634
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,660 7,660 7,660 7,660 7,660 7,660 7,660 7,660
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ###
p 4,806 4,806 4,806 4,806 4,806 4,806 4,806 4,806
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### i 23,709 23,709 23,709 23,709 23,709 23,709 23,709 23,709
18.26 PINTURA EPÓXICA M2 ### o 13,688 13,688 13,688 13,688 13,688 13,688 13,688 13,688
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,444 8,444 8,444 8,444 8,444 8,444 8,444 8,444

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,656,931 6,656,931 6,656,931 6,656,931 6,656,931 6,656,931 6,656,931 6,656,931
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO
19.2 PARA MOVILIZAR (PAR) UN ### 11,761,743 11,761,743 11,761,743 11,761,743 11,761,743 11,761,743 11,761,743 11,761,743
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,077,971 3,077,971 3,077,971 3,077,971 3,077,971 3,077,971 3,077,971 3,077,971
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 10,059,227 10,059,227 10,059,227 10,059,227 10,059,227 10,059,227 10,059,227 10,059,227
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,420,676 9,420,676 9,420,676 9,420,676 9,420,676 9,420,676 9,420,676 9,420,676
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 944,126 944,126 944,126 944,126 944,126 944,126 944,126 944,126
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 94,411 94,411 94,411 94,411 94,411 94,411 94,411 94,411
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,709,369 1,709,047 1,709,177 1,709,429 1,709,525 1,709,177 1,709,655 1,709,264
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 735,265 727,725 730,782 736,692 738,933 730,782 741,990 732,820

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 31,602 31,602 31,602 31,602 31,602 31,602 31,602 31,602
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 47,204 47,204 47,204 47,204 47,204 47,204 47,204 47,204
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 58,615 58,615 58,615 58,615 58,615 58,615 58,615 58,615
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,947 18,947 18,947 18,947 18,947 18,947 18,947 18,947
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 23,021 23,021 23,021 23,021 23,021 23,021 23,021 23,021
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 31,458 31,458 31,458 31,458 31,458 31,458 31,458 31,458
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,719 27,719 27,719 27,719 27,719 27,719 27,719 27,719
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 29,254 29,254 29,254 29,254 29,254 29,254 29,254 29,254
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 36,671 36,671 36,671 36,671 36,671 36,671 36,671 36,671
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 19,268 19,268 19,268 19,268 19,268 19,268 19,268 19,268
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 25,275 25,275 25,275 25,275 25,275 25,275 25,275 25,275
20.12 VÁLVULA DE BOLA GAS 1" UN ### 38,920 38,920 38,920 38,920 38,920 38,920 38,920 38,920
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 298,490 298,490 298,490 298,490 298,490 298,490 298,490 298,490
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 343,643 343,643 343,643 343,643 343,643 343,643 343,643 343,643
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 358,265 358,265 358,265 358,265 358,265 358,265 358,265 358,265
20.16 ACOMETIDA GAS 1/2" ML ### 332,162 332,162 332,162 332,162 332,162 332,162 332,162 332,162

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 242,688 242,688 242,688 242,688 242,688 242,688 242,688 242,688
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 37,257 37,257 37,257 37,257 37,257 37,257 37,257 37,257
21.3 SIRENA DE 110 V UN ### 113,105 113,105 113,105 113,105 113,105 113,105 113,105 113,105
21.4 CÁMARA CCTV UN ### 285,723 285,723 285,723 285,723 285,723 285,723 285,723 285,723
21.5 PARLANTE-CIELO FALSO UN ### 56,599 56,599 56,599 56,599 56,599 56,599 56,599 56,599
21.6 AMPLIFICADOR 100W UN ### 626,606 626,606 626,606 626,606 626,606 626,606 626,606 626,606
21.7 AMPLIFICADOR 300W UN ### 1,556,976 1,556,976 1,556,976 1,556,976 1,556,976 1,556,976 1,556,976 1,556,976
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 48,056 48,056 48,056 48,056 48,056 48,056 48,056 48,056
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 242,942 242,942 242,942 242,942 242,942 242,942 242,942 242,942
21.10 TOMA PARA MICRÓFONO UN ### 47,722 47,722 47,722 47,722 47,722 47,722 47,722 47,722
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 4,104 4,104 4,104 4,104 4,104 4,104 4,104 4,104
21.12 SPLITERS UN ### 6,917 6,917 6,917 6,917 6,917 6,917 6,917 6,917
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 20,084 20,084 20,084 20,084 20,084 20,084 20,084 20,084
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 26,323 26,323 26,323 26,323 26,323 26,323 26,323 26,323
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 34,241 34,241 34,241 34,241 34,241 34,241 34,241 34,241
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 134,322 134,322 134,322 134,322 134,322 134,322 134,322 134,322
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 35,037 35,037 35,037 35,037 35,037 35,037 35,037 35,037
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
21.18 BANDEJA PORTACABLES PARA RACK UN ###
p 114,735 114,735 114,735 114,735 114,735 114,735 114,735 114,735
21.19 RACK 2' X 24" UN ### i 199,276 199,276 199,276 199,276 199,276 199,276 199,276 199,276
21.20 RACK 3' X 24" UN ### o 314,299 314,299 314,299 314,299 314,299 314,299 314,299 314,299
21.21 RACK 5' X 24" UN ### 389,914 389,914 389,914 389,914 389,914 389,914 389,914 389,914
21.22 RACK 7' X 24" UN ### 426,313 426,313 426,313 426,313 426,313 426,313 426,313 426,313
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 622,727 622,727 622,727 622,727 622,727 622,727 622,727 622,727
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 366,376 366,376 366,376 366,376 366,376 366,376 366,376 366,376
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 113,829 113,829 113,829 113,829 113,829 113,829 113,829 113,829
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 15,186 15,186 15,186 15,186 15,186 15,186 15,186 15,186
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 31,056 31,056 31,056 31,056 31,056 31,056 31,056 31,056
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,442 5,442 5,442 5,442 5,442 5,442 5,442 5,442
21.29 CANALETA METÁLICA 4X6 CMS ML ### 38,251 38,251 38,251 38,251 38,251 38,251 38,251 38,251
21.30 CANALETA METÁLICA 4X10 CMS ML ### 39,987 39,987 39,987 39,987 39,987 39,987 39,987 39,987
21.31 CANALETA METÁLICA 6X10 CMS ML ### 40,853 40,853 40,853 40,853 40,853 40,853 40,853 40,853
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 26,648 26,648 26,648 26,648 26,648 26,648 26,648 26,648
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 29,503 29,503 29,503 29,503 29,503 29,503 29,503 29,503
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 30,701 30,701 30,701 30,701 30,701 30,701 30,701 30,701
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 51,778 51,778 51,778 51,778 51,778 51,778 51,778 51,778
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 671,013 671,013 671,013 671,013 671,013 671,013 671,013 671,013
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 344,195 344,195 344,195 344,195 344,195 344,195 344,195 344,195
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 95,998 95,998 95,998 95,998 95,998 95,998 95,998 95,998
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,995 1,995 1,995 1,995 1,995 1,995 1,995 1,995
21.40 CABLE TELEFÓNICO 10 PARES ML ### 9,218 9,218 9,218 9,218 9,218 9,218 9,218 9,218
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,781 13,781 13,781 13,781 13,781 13,781 13,781 13,781
21.42 CABLE TELEFÓNICO 40 PARES ML ### 23,027 23,027 23,027 23,027 23,027 23,027 23,027 23,027
21.43 CABLE TELEVISIÓN RG6 ML ### 4,255 4,255 4,255 4,255 4,255 4,255 4,255 4,255
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 24,031 24,031 24,031 24,031 24,031 24,031 24,031 24,031
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 35,047 35,047 35,047 35,047 35,047 35,047 35,047 35,047
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,960 20,960 20,960 20,960 20,960 20,960 20,960 20,960
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 16,730 16,730 16,730 16,730 16,730 16,730 16,730 16,730
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 678,361 678,361 678,361 678,361 678,361 678,361 678,361 678,361
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
URBANISMO p
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 29,637 29,637 29,637 29,637 29,637 29,637 29,637 29,637
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 99,273 99,273 99,273 99,273 99,273 99,273 99,273 99,273
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 559,492 559,492 559,492 559,492 559,492 559,492 559,492 559,492
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,194,204 1,194,204 1,194,204 1,194,204 1,194,204 1,194,204 1,194,204 1,194,204
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 136,842 136,842 136,842 136,842 136,842 136,842 136,842 136,842
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 834,008 834,008 834,008 834,008 834,008 834,008 834,008 834,008
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,795,108 1,795,108 1,795,108 1,795,108 1,795,108 1,795,108 1,795,108 1,795,108
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 14,234 14,234 14,234 14,234 14,234 14,234 14,234 14,234
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 17,579 17,579 17,579 17,579 17,579 17,579 17,579 17,579
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 22,097 22,097 22,097 22,097 22,097 22,097 22,097 22,097
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 24,193 24,193 24,193 24,193 24,193 24,193 24,193 24,193
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 29,023 29,023 29,023 29,023 29,023 29,023 29,023 29,023
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 29,023 29,023 29,023 29,023 29,023 29,023 29,023 29,023
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 116,981 116,981 116,981 116,981 116,981 116,981 116,981 116,981
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 135,487 135,487 135,487 135,487 135,487 135,487 135,487 135,487
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 419,346 419,346 419,346 419,346 419,346 419,346 419,346 419,346
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 157,486 157,486 157,486 157,486 157,486 157,486 157,486 157,486
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 259,613 259,613 259,613 259,613 259,613 259,613 259,613 259,613
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,149,082 1,149,082 1,149,082 1,149,082 1,149,082 1,149,082 1,149,082 1,149,082
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,323,944 1,323,944 1,323,944 1,323,944 1,323,944 1,323,944 1,323,944 1,323,944
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 15,471 15,471 15,471 15,471 15,471 15,471 15,471 15,471
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,643 13,643 13,643 13,643 13,643 13,643 13,643 13,643
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 33,843 33,843 33,843 33,843 33,843 33,843 33,843 33,843
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 134,091 134,091 134,091 134,091 134,091 134,091 134,091 134,091
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 199,781 199,781 199,781 199,781 199,781 199,781 199,781 199,781
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 32,601 32,601 32,601 32,601 32,601 32,601 32,601 32,601
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 112,379 112,379 112,379 112,379 112,379 112,379 112,379 112,379
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 166,629 166,629 166,629 166,629 166,629 166,629 166,629 166,629
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 32,970 32,970 32,970 32,970 32,970 32,970 32,970 32,970
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 68,006 68,006 68,006 68,006 68,006 68,006 68,006 68,006
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 274,111 274,111 274,111 274,111 274,111 274,111 274,111 274,111
1.32 UNIÓN REPARACION PVC 4" UN ### 79,363 79,363 79,363 79,363 79,363 79,363 79,363 79,363
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 318,955 318,955 318,955 318,955 318,955 318,955 318,955 318,955
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 190,977 190,977 190,977 190,977 190,977 190,977 190,977 190,977
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 544,288 544,288 544,288 544,288 544,288 544,288 544,288 544,288
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,458,797 1,458,797 1,458,797 1,458,797 1,458,797 1,458,797 1,458,797 1,458,797
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,155,577 2,155,577 2,155,577 2,155,577 2,155,577 2,155,577 2,155,577 2,155,577

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,585 11,585 11,585 11,585 11,585 11,585 11,585 11,585
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 26,455 26,455 26,455 26,455 26,455 26,455 26,455 26,455
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 85,334 64,419 72,898 89,291 95,509 72,898 103,988 78,551
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 103,447 71,810 71,810 77,083 71,810 77,083 71,810 84,114
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 103,447 71,810 71,810 77,083 71,810 77,083 71,810 84,114
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 96,552 81,179 83,229 81,179 83,229 84,254 94,502 88,353
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 68,100 82,602 54,518 52,428 54,518 55,563 66,010 59,742
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 114,523 88,629 99,126 119,422 127,120 99,126 137,618 106,125

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 125,055 125,055 125,055 125,055 125,055 125,055 125,055 125,055
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,304,495 1,304,495 1,304,495 1,304,495 1,304,495 1,304,495 1,304,495 1,304,495
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ###
p 163,449 163,449 163,449 163,449 163,449 163,449 163,449 163,449
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### i 1,510,953 1,510,953 1,510,953 1,510,953 1,510,953 1,510,953 1,510,953 1,510,953
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### o 1,053,067 1,053,067 1,053,067 1,053,067 1,053,067 1,053,067 1,053,067 1,053,067
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 64,067 64,067 64,067 64,067 64,067 64,067 64,067 64,067
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 124,141 124,141 124,141 124,141 124,141 124,141 124,141 124,141
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 293,208 293,208 293,208 293,208 293,208 293,208 293,208 293,208
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 293,201 293,201 293,201 293,201 293,201 293,201 293,201 293,201
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 470,761 470,761 470,761 470,761 470,761 470,761 470,761 470,761
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 124,193 124,193 124,193 124,193 124,193 124,193 124,193 124,193
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 124,193 124,193 124,193 124,193 124,193 124,193 124,193 124,193
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 293,208 293,208 293,208 293,208 293,208 293,208 293,208 293,208
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 293,208 293,208 293,208 293,208 293,208 293,208 293,208 293,208
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 470,761 470,761 470,761 470,761 470,761 470,761 470,761 470,761
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 471,213 471,213 471,213 471,213 471,213 471,213 471,213 471,213
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 766,135 766,135 766,135 766,135 766,135 766,135 766,135 766,135
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,230,020 1,230,020 1,230,020 1,230,020 1,230,020 1,230,020 1,230,020 1,230,020
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 76,074 76,074 76,074 76,074 76,074 76,074 76,074 76,074
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 394,047 394,047 394,047 394,047 394,047 394,047 394,047 394,047
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 443,372 443,372 443,372 443,372 443,372 443,372 443,372 443,372
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,225,633 1,225,633 1,225,633 1,225,633 1,225,633 1,225,633 1,225,633 1,225,633
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 71,849 71,582 71,690 71,899 71,979 71,690 72,087 71,762
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 357,068 357,068 357,068 357,068 357,068 357,068 357,068 357,068
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 54,518 54,518 54,518 54,518 54,518 54,518 54,518 54,518
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 77,130 77,130 77,130 77,130 77,130 77,130 77,130 77,130
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 111,336 111,336 111,336 111,336 111,336 111,336 111,336 111,336
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 170,916 170,916 170,916 170,916 170,916 170,916 170,916 170,916
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 274,743 274,743 274,743 274,743 274,743 274,743 274,743 274,743
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 397,736 397,736 397,736 397,736 397,736 397,736 397,736 397,736
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 503,576 503,576 503,576 503,576 503,576 503,576 503,576 503,576
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 662,227 662,227 662,227 662,227 662,227 662,227 662,227 662,227
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 911,391 911,391 911,391 911,391 911,391 911,391 911,391 911,391

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 721,428 703,332 710,668 724,851 730,231 710,668 737,567 715,558

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO


4.2 E=1.5CM Y CAÑUELA)
ML ### 706,104 693,415 698,559 708,504 712,276 698,559 717,420 701,989

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y
4.3 TAPA HF)
UN ### 770,689 758,625 763,516 772,971 776,558 763,516 781,449 766,776

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 857,200 834,580 843,751 861,479 868,204 843,751 877,375 849,864

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO


4.5 E=1.5CM Y CAÑUELA)
ML ### 1,004,016 986,148 993,391 1,007,396 1,012,708 993,391 1,019,951 998,221

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO
4.6 Y TAPA HF)
UN ### 889,715 873,127 879,851 892,852 897,784 879,851 904,509 884,334
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,066,864 1,057,936 1,061,555 1,068,554 1,071,211 1,061,555 1,074,834 1,063,968
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,548,092 1,522,298 1,532,754 1,552,972 1,560,644 1,532,754 1,571,106 1,539,725
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,125,704 2,077,474 2,097,026 2,134,827 2,149,167 2,097,026 2,168,720 2,110,062
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,813,693 2,733,522 2,766,022 2,828,857 2,852,694 2,766,022 2,885,197 2,787,691
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,992,868 1,992,868 1,992,868 1,992,868 1,992,868 1,992,868 1,992,868 1,992,868
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,219,386 4,219,386 4,219,386 4,219,386 4,219,386 4,219,386 4,219,386 4,219,386
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE
4.13 INTERNO Y DEMOLICIÓN)
UN ### 148,970 148,452 148,662 149,068 149,222 148,662 149,432 148,802

5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ###
p 79,928 78,534 79,099 80,192 80,606 79,099 81,172 79,476
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### i 94,644 93,250 93,815 94,908 95,322 93,815 95,888 94,192
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### o 60,168 56,883 58,215 60,790 61,766 58,215 63,098 59,103
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 65,039 61,872 63,156 65,638 66,579 63,156 67,863 64,012
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 65,368 62,280 63,532 65,951 66,869 63,532 68,121 64,366
5.6 BORDE SEPARADOR VERDE A-170 ML ### 276,113 275,595 275,805 276,211 276,365 275,805 276,575 275,945
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,680 19,286 19,445 19,754 19,872 19,445 20,031 19,552
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 43,028 40,713 41,651 43,466 44,154 41,651 45,093 42,277
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 90,365 90,088 90,201 90,418 90,500 90,201 90,612 90,276
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 600,063 593,151 595,953 601,370 603,425 595,953 606,227 597,821
5.11 LOSETA PREFABRICADA A-40 M2 ### 67,775 66,590 67,071 68,000 68,352 67,071 68,832 67,391
5.12 LOSETA PREFABRICADA A-60 M2 ### 98,587 97,402 97,882 98,811 99,163 97,882 99,644 98,203
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 35,773 34,506 35,020 36,013 36,389 35,020 36,903 35,362
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 57,584 55,020 56,059 58,069 58,831 56,059 59,870 56,752
5.15 SARDINEL PREFABRICADO A-10 ML ### 109,786 105,927 106,437 110,634 111,313 106,636 111,027 107,507
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 65,227 64,510 64,800 65,362 65,576 64,800 65,866 64,994

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 219,844 218,336 218,947 220,129 220,577 218,947 221,189 219,354
6.2 BANCA EN CONCRETO M-30 UN ### 723,629 721,518 722,374 724,029 724,656 722,374 725,512 722,945
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 232,683 232,365 232,494 232,743 232,837 232,494 232,966 232,580
6.4 BOLARDO M-60 CONCRETO UN ### 174,975 173,166 173,899 175,318 175,856 173,899 176,589 174,388
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 176,955 175,145 175,879 177,297 177,835 175,879 178,569 176,368
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 207,765 205,861 206,633 208,126 208,692 206,633 209,464 207,148
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 63,767 62,699 63,132 63,969 64,286 63,132 64,719 63,420
6.8 BORDILLO PREFABRICADO A-80 ML ### 74,232 73,037 73,522 74,458 74,814 73,522 75,298 73,845
6.9 CANECA M-120 UN ### 338,789 338,522 338,630 338,839 338,918 338,630 339,027 338,702
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 892,779 891,874 892,241 892,950 893,219 892,241 893,586 892,486
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,668,093 3,667,490 3,667,735 3,668,207 3,668,387 3,667,735 3,668,631 3,667,898
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,773,482 3,772,879 3,773,124 3,773,596 3,773,776 3,773,124 3,774,020 3,773,287
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 527,310 526,675 526,932 527,430 527,619 526,932 527,876 527,104
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 698,388 695,848 696,878 698,868 699,624 696,878 700,653 697,564
6.15 BANCA EN MADERA M-50 UN ### 580,119 580,119 580,119 580,119 580,119 580,119 580,119 580,119
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 268,072 267,167 267,534 268,243 268,512 267,534 268,879 267,778
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 625,048 624,380 624,651 625,174 625,372 624,651 625,643 624,831
6.18 POSTE HISTÓRICO M-131 UN ### 6,971,151 6,966,627 6,968,461 6,972,007 6,973,352 6,968,461 6,975,186 6,969,684

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,379 4,379 4,379 4,379 4,379 4,379 4,379 4,379
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 46,709 46,709 46,709 46,709 46,709 46,709 46,709 46,709
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 340,054 339,795 339,900 340,103 340,180 339,900 340,285 339,970
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 534,103 532,833 533,348 534,343 534,721 533,348 535,236 533,691
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 252,623 252,364 252,469 252,672 252,749 252,469 252,854 252,539
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 268,435 268,176 268,281 268,484 268,561 268,281 268,666 268,351
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 280,409 280,150 280,255 280,458 280,535 280,255 280,640 280,325
7.8 TACHAS REFLECTIVAS UN ### 14,627 14,627 14,627 14,627 14,627 14,627 14,627 14,627
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,627 15,627 15,627 15,627 15,627 15,627 15,627 15,627
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN)
UN ### 127,704 127,704 127,704 127,704 127,704 127,704 127,704 127,704
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
VÍAS (SEGÚN ESPECIFICACIONES p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.1 201 P UNA DISTANCIA DE 5KM) M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.2 201 P DISTANCIA DE 5KM)
M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.3 200.1 DISTANCIA DE 5KM)
HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE


1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.5 201.7 DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,


1.6 *** SOBREACARREOS Y DERRUMBES
M3-KM### 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,786 36,786 36,786 36,786 36,786 36,786 36,786 36,786
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494 494 494 494 494 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA
2.9 600.1 DISTANCIA MENOR DE 5 KM)
M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA


2.10 600.2 DISTANCIA MENOR DE 5 KM)
M3 ### 67,400 67,400 67,400 67,400 67,400 67,400 67,400 67,400

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA


2.11 600.3 DISTANCIA MENOR DE 5 KM)
M3 ### 82,567 82,567 82,567 82,567 82,567 82,567 82,567 82,567

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A


2.12 600.4 UNA DISTANCIA MENOR DE 5 KM)
M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE


2.13 600.4 P SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE


2.14 600.5 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO


2.15 600.5 P DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 141,265 109,628 113,143 148,295 153,568 114,901 150,053 121,931
3.3 330.1 BASE GRANULAR M3 ### 175,300 143,663 147,179 182,331 187,603 148,936 184,088 155,967
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3.4 365.1 ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,468 3,468 3,468 3,468 3,468 3,468 3,468 3,468
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,189 1,189 1,189 1,189 1,189 1,189 1,189 1,189
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 237,672 231,899 234,239 238,764 240,480 234,239 242,820 235,799
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 71,818 70,006 70,741 72,160 72,699 70,741 73,433 71,230
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 611,668 719,828 741,798 645,468 616,738 736,728 658,988 758,698
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 650,049 758,209 780,179 683,849 655,119 775,109 697,369 797,079
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 690,064 798,224 820,194 723,864 695,134 815,124 737,384 837,094
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 680,754 788,914 810,884 714,554 685,824 805,814 728,074 827,784
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### p 437,099 464,689 446,622 391,573 381,404 436,792 395,841 457,844
i
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### o 336,174 304,537 308,053 343,205 348,477 309,810 344,962 316,841
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 300,672 269,035 272,551 307,703 312,975 274,308 309,460 281,339
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 41,356 41,356 41,356 41,356 41,356 41,356 41,356 41,356

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 184,638 184,638 184,638 184,638 184,638 184,638 184,638 184,638
3.15 311.1 AFIRMADO M3 ### 97,894 66,257 66,257 71,530 66,257 71,530 66,257 78,560
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,267 11,868 12,030 12,342 12,460 12,030 12,622 12,137
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,937 4,738 4,819 4,975 5,034 4,819 5,115 4,872
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE
3.18 500.1 TRANSFERENCIA Y UNIÓN
M3 ### 682,041 652,925 664,729 687,548 696,205 664,729 708,008 672,598

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE


3.19 500.1 TRANSFERENCIA Y UNIÓN M3 ### 716,788 686,369 698,701 722,542 731,586 698,701 743,918 706,923

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE


3.20 500.1 TRANSFERENCIA Y UNIÓN
M3 ### 739,989 708,682 721,374 745,911 755,219 721,374 767,910 729,835

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA,


3.21 *** SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,542 7,542 7,542 7,542 7,542 7,542 7,542 7,542
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 103,710 113,012 84,376 81,402 84,376 85,863 100,735 91,812

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 970,272 937,246 950,635 976,519 986,339 950,635 999,727 959,561
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 836,071 803,591 816,758 842,213 851,870 816,758 865,037 825,536
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 885,218 851,452 865,141 891,604 901,643 865,141 915,332 874,266
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 606,781 577,085 589,123 612,397 621,227 589,123 633,266 597,149
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 708,351 677,479 689,994 714,190 723,369 689,994 735,885 698,338
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 603,618 573,157 585,506 609,381 618,437 585,506 630,786 593,739
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 705,064 673,396 686,234 711,054 720,469 686,234 733,308 694,793
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 769,189 738,728 751,077 774,951 784,008 751,077 796,357 759,310
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 624,000 592,332 605,170 629,990 639,405 605,170 652,243 613,728
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 815,688 784,020 796,858 821,678 831,093 796,858 843,932 805,417
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,637 12,637 12,637 12,637 12,637 12,637 12,637 12,637

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588


4.12 650 P GRADO B KG ### 16,267 16,267 16,267 16,267 16,267 16,267 16,267 16,267
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,909 1,909 1,909 1,909 1,909 1,909 1,909 1,909
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE
4.14 621.1 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,865,808 2,865,808 2,865,808 2,865,808 2,865,808 2,865,808 2,865,808 2,865,808

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL


4.15 621.1 P (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
ML ### 4,361,822 4,305,329 4,328,231 4,372,508 4,389,304 4,328,231 4,412,206 4,343,500

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,803,892 1,773,732 1,785,959 1,809,597 1,818,564 1,785,959 1,830,791 1,794,110
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3)### 94,160 94,160 94,160 94,160 94,160 94,160 94,160 94,160
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 383,355 379,736 381,203 384,040 385,116 381,203 386,583 382,181
4.19 632 P BARANDA METÁLICA ML ### 452,531 452,531 452,531 452,531 452,531 452,531 452,531 452,531
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 18,266 18,266 18,266 18,266 18,266 18,266 18,266 18,266
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 527,982 476,286 489,351 517,854 524,190 492,596 537,255 505,632
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 118,919 96,611 99,585 96,611 99,585 101,073 115,945 107,021
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 106,320 77,116 77,116 81,984 77,116 81,984 77,116 88,473
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 405,885 373,822 386,821 411,950 421,484 386,821 434,481 395,486
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 387,852 372,188 369,496 383,343 390,088 370,037 403,759 377,348
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 396,523 380,859 378,167 392,014 398,759 378,708 412,430 386,019
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 403,682 388,291 385,489 399,120 405,783 386,030 419,343 393,266
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 412,353 396,962 394,160 407,791 414,454 394,701 428,014 401,937
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ###
p 550,615 519,013 531,825 556,592 565,987 531,825 578,799 540,366
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### i 650,205 617,351 630,671 656,419 666,186 630,671 679,505 639,549
4.31 681.1 GAVIÓN M3 ### o 198,154 207,034 179,699 176,860 179,699 181,119 195,315 186,797
4.32 681.1 GAVIÓN MALLA PVC M3 ### 202,668 211,547 184,213 181,374 184,213 185,632 199,828 191,311
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 45,064 43,124 43,911 45,431 46,008 43,911 46,794 44,435
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 17,438 16,468 16,861 17,621 17,910 16,861 18,303 17,123

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA


4.35 *** ÚLTIMA 25 KN)
M2 ### 10,910 10,910 10,910 10,910 10,910 10,910 10,910 10,910
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 15,569 15,569 15,569 15,569 15,569 15,569 15,569 15,569
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 20,964 20,964 20,964 20,964 20,964 20,964 20,964 20,964
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4.38 *** ÚLTIMA 100 KN)
M2 ### 25,139 25,139 25,139 25,139 25,139 25,139 25,139 25,139

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA


4.39 *** ÚLTIMA 165 KN) M2 ### 32,312 32,312 32,312 32,312 32,312 32,312 32,312 32,312

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y


4.40 *** SEPARACIÓN) M2 ### 7,830 7,830 7,830 7,830 7,830 7,830 7,830 7,830

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y


4.41 *** SEPARACIÓN)
M2 ### 8,926 8,926 8,926 8,926 8,926 8,926 8,926 8,926

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y


4.42 *** SEPARACIÓN) M2 ### 9,278 9,278 9,278 9,278 9,278 9,278 9,278 9,278

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y


4.43 *** SEPARACIÓN)
M2 ### 6,604 6,604 6,604 6,604 6,604 6,604 6,604 6,604

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y


4.44 *** SEPARACIÓN) M2 ### 9,958 9,958 9,958 9,958 9,958 9,958 9,958 9,958

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y


4.45 *** SEPARACIÓN)
M2 ### 8,115 8,115 8,115 8,115 8,115 8,115 8,115 8,115

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y


4.46 *** SEPARACIÓN)
M2 ### 9,958 9,958 9,958 9,958 9,958 9,958 9,958 9,958

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y


4.47 *** SEPARACIÓN) M2 ### 19,151 19,151 19,151 19,151 19,151 19,151 19,151 19,151

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I,


4.48 661.1 INCLUYE EMBOQUILLADA ML ### 681,505 681,048 681,233 681,592 681,728 681,233 681,913 681,357

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 390,184 383,316 386,100 391,482 393,524 386,100 396,308 387,956

4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 954,341 954,341 954,341 954,341 954,341 954,341 954,341 954,341
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 168,236 137,816 137,816 142,886 137,816 142,886 137,816 149,646
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,785 4,785 4,785 4,785 4,785 4,785 4,785 4,785
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 92,939 92,939 92,939 92,939 92,939 92,939 92,939 92,939

4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 141,635 141,635 141,635 141,635 141,635 141,635 141,635 141,635
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 559,624 526,770 540,089 565,838 575,605 540,089 588,924 548,968
4.56 682.1 P COLCHONETA RENO M3 ### 215,123 224,003 196,668 193,829 196,668 198,088 212,284 203,766
4.57 *** TRINCHO EN MADERA M2 ### 73,514 73,514 73,514 73,514 73,514 73,514 73,514 73,514

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,380 4,380 4,380 4,380 4,380 4,380 4,380 4,380
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 46,709 46,709 46,709 46,709 46,709 46,709 46,709 46,709
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 90,659 90,659 90,659 90,659 90,659 90,659 90,659 90,659
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 75,400 75,400 75,400 75,400 75,400 75,400 75,400 75,400
5.5 730.1 DEFENSA METÁLICA ML ### 159,276 157,799 158,398 159,555 159,994 158,398 160,592 158,797
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 14,627 14,627 14,627 14,627 14,627 14,627 14,627 14,627

6 NORMA INV MANTENIMIENTO VIAL


GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u GUAVIO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Gachalá Gachetá Gama Guasca Guatavita Junín La_Calera Ubalá
i
6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ###
p 874 874 874 874 874 874 874 874
i
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE
6.2 801.6 UN ### o 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847
RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y


6.3 801.7 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6.6 801.4 DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 16,143 16,143 16,143 16,143 16,143 16,143 16,143 16,143
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 26,227 26,227 26,227 26,227 26,227 26,227 26,227 26,227
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,790 9,790 9,790 9,790 9,790 9,790 9,790 9,790

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,177,126 2,155,677 2,157,266 2,163,621 2,161,238 2,141,379 2,153,295
1.2 CAMPAMENTO 9 M2 UN ### 1,267,206 1,256,482 1,257,277 1,260,454 1,259,263 1,249,333 1,255,291
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 15,216 15,216 15,216 15,216 15,216 15,216 15,216
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 17,060 17,060 17,060 17,060 17,060 17,060 17,060
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,718 19,718 19,718 19,718 19,718 19,718 19,718
1.6 CERCA EN TABLA H=2.30 M ML ### 71,395 71,395 71,395 71,395 71,395 71,395 71,395
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 50,212 49,982 49,999 50,067 50,042 49,828 49,956
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 23,255 23,024 23,041 23,110 23,084 22,871 22,999
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 984,700 980,903 981,671 981,160 982,993 979,864 979,154
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 11,181 11,181 11,181 11,181 11,181 11,181 11,181
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 4,081 4,081 4,081 4,081 4,081 4,081 4,081
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,927,007 2,927,007 2,927,007 2,927,007 2,927,007 2,927,007 2,927,007
1.44 RED TELEFÓNICA PROVISIONAL UN ### 270,090 270,090 270,090 270,090 270,090 270,090 270,090
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 127,007 88,356 98,902 90,097 127,007 109,431 74,279
2.2 BASE ARENA CEMENTO 1:20 M3 ### 229,540 208,153 209,737 216,074 213,698 193,895 205,777
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 217,047 217,047 217,047 217,047 217,047 217,047 217,047
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ###
p 24,085 24,085 24,085 24,085 24,085 24,085 24,085
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### i 699,476 676,775 678,457 685,183 682,661 661,641 674,253
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### o 701,428 678,010 679,746 686,684 684,082 662,400 675,410
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 652,725 630,798 632,423 638,919 636,483 616,181 628,363
2.9 PILOTE DE MADERA D=20 CM ML ### 51,655 51,655 51,655 51,655 51,655 51,655 51,655
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM)
ML ### 159,612 159,612 159,612 159,612 159,612 159,612 159,612

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.11 DISTANCIA MENOR DE 5 KM)
ML ### 200,940 200,940 200,940 200,940 200,940 200,940 200,940

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.12 DISTANCIA MENOR DE 5 KM)
ML ### 250,918 250,918 250,918 250,918 250,918 250,918 250,918

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.13 DISTANCIA MENOR DE 5 KM)
ML ### 318,196 318,196 318,196 318,196 318,196 318,196 318,196
2.14 PILOTE HINCADO 25X25 ML ### 111,721 110,135 110,253 110,723 110,546 109,078 109,959
2.15 PILOTE HINCADO 30X30 ML ### 138,625 136,327 136,497 137,178 136,923 134,795 136,072
2.16 DADOS EN CONCRETO 3500PSI M3 ### 637,727 615,800 617,425 623,921 621,485 601,183 613,365
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM)
ML ### 95,746 95,746 95,746 95,746 95,746 95,746 95,746

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 41,642 41,509 41,519 41,558 41,543 41,420 41,494
3.2 SIFÓN EN PVC 6" UN ### 216,175 216,042 216,052 216,091 216,076 215,953 216,027
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 503,047 481,762 487,376 480,102 496,457 479,960 468,386
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 245,624 241,708 242,339 242,354 243,497 240,143 240,345
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 280,980 274,611 275,618 275,705 277,478 272,007 272,444
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 370,648 360,976 362,227 363,293 364,699 356,169 358,442
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 112,050 111,901 111,961 111,841 112,050 111,951 111,752
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,401,549 1,400,057 1,400,654 1,399,460 1,401,549 1,400,554 1,398,564
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 126,019 124,551 124,660 125,095 124,932 123,573 124,388
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 79,668 78,894 78,951 79,181 79,095 78,378 78,808
3.11 TUBERÍA DRENAJE PVC 110 ML ### 30,475 30,060 30,091 30,214 30,167 29,783 30,014
3.12 TUBERÍA DRENAJE PVC 160 ML ### 49,050 48,635 48,665 48,788 48,742 48,358 48,588
3.13 TUBERÍA DRENAJE PVC 200 ML ### 64,446 63,864 63,908 64,080 64,015 63,477 63,800
3.14 TUBERÍA DRENAJE PVC 250 ML ### 88,214 87,549 87,599 87,795 87,722 87,106 87,476
3.15 TUBERÍA DRENAJE PVC 315 ML ### 121,958 121,376 121,419 121,592 121,527 120,989 121,312
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE)
UN ### 1,048,605 1,041,960 1,042,453 1,044,421 1,043,683 1,037,531 1,041,222

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3.17 FILTRANTE)
UN ### 1,486,104 1,472,814 1,473,799 1,477,737 1,476,260 1,463,955 1,471,338

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL


3.18 FILTRANTE)
UN ### 1,942,776 1,916,197 1,918,166 1,926,042 1,923,088 1,898,478 1,913,245

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 45,903 45,903 45,903 45,903 45,903 45,903 45,903
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 60,686 60,686 60,686 60,686 60,686 60,686 60,686
4.3 COLUMNAS 3500 PSI M3 ### 874,047 852,119 853,745 860,241 857,805 837,502 849,684
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 271,439 257,470 258,922 262,226 269,867 256,514 255,918
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI
M2 ### 107,437 105,308 105,465 106,096 105,860 103,889 105,071

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE


4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 126,790 124,235 124,425 125,182 124,898 122,532 123,952

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 140,522 137,116 137,368 138,377 137,999 134,845 136,738
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 148,285 144,665 144,934 146,006 145,604 142,253 144,264
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 170,085 165,614 165,945 167,270 166,773 162,634 165,117
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ###
p 189,260 184,150 184,529 186,043 185,475 180,745 183,583
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### i 210,073 204,325 204,752 206,454 205,816 200,494 203,687
o
4.12 ENTREPISO VIGUETA PLACA M2 ### 108,159 107,794 107,821 107,930 107,889 107,551 107,754
4.13 ESCALERA MACIZA 3500 PSI M3 ### 1,035,711 1,013,784 1,015,409 1,021,905 1,019,469 999,167 1,011,349
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 103,782 103,494 103,515 103,601 103,569 103,301 103,462
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 85,847 83,654 83,817 84,466 84,223 82,192 83,411
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 96,702 94,019 94,218 95,013 94,715 92,231 93,721
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 112,774 109,411 109,660 110,657 110,283 107,169 109,037
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 765,778 743,850 745,476 751,972 749,536 729,234 741,416
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 53,171 52,501 52,550 52,749 52,675 52,054 52,426
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 304,402 294,609 295,335 298,236 297,149 288,082 293,522
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,567 4,567 4,567 4,567 4,567 4,567 4,567
4.22 ACERO FIGURADO 60000 PSI KG ### 4,790 4,790 4,790 4,790 4,790 4,790 4,790
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,673 6,673 6,673 6,673 6,673 6,673 6,673
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 922,565 900,638 902,263 908,759 906,323 886,021 898,203
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 841,796 817,793 819,572 826,683 824,017 801,794 815,128
4.26 VIGA AÉREA 3500 PSI M3 ### 914,249 892,322 893,947 900,443 898,007 877,705 889,887
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 892,980 871,052 872,677 879,174 876,738 856,435 868,617
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,116,410 1,094,482 1,096,108 1,102,604 1,100,168 1,079,866 1,092,047
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 355,848 331,301 333,120 340,393 337,665 314,937 328,575

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 32,043 31,463 31,506 31,678 31,613 31,076 31,399
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 53,690 53,110 53,153 53,325 53,261 52,724 53,046
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 37,823 37,691 37,700 37,740 37,725 37,602 37,676
5.4 ARCOS EN LADRILLO PRENSADO ML ### 176,795 176,529 176,549 176,627 176,598 176,352 176,499
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 47,625 46,955 47,004 47,203 47,129 46,508 46,880
5.6 DINTELES EN BLOQUE 0.15 M ML ### 29,314 29,025 29,046 29,132 29,100 28,832 28,993
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 108,307 107,776 107,815 107,973 107,914 107,422 107,717
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 98,986 96,751 96,916 97,579 97,330 95,260 96,502
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 99,107 99,107 99,107 99,107 99,107 99,107 99,107
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 57,953 57,953 57,953 57,953 57,953 57,953 57,953
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 95,405 95,405 95,405 95,405 95,405 95,405 95,405
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 56,102 56,102 56,102 56,102 56,102 56,102 56,102
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 110,900 110,900 110,900 110,900 110,900 110,900 110,900
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 65,250 65,250 65,250 65,250 65,250 65,250 65,250
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 123,463 123,463 123,463 123,463 123,463 123,463 123,463
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 71,531 71,531 71,531 71,531 71,531 71,531 71,531
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 44,348 44,081 44,101 44,180 44,150 43,903 44,051
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 26,746 26,613 26,623 26,662 26,648 26,524 26,598
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 57,848 57,670 57,683 57,736 57,716 57,552 57,650
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 34,626 34,537 34,544 34,570 34,560 34,478 34,527
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 65,049 64,871 64,884 64,937 64,917 64,752 64,851
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 38,940 38,851 38,858 38,884 38,874 38,792 38,841
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 108,494 107,604 107,670 107,934 107,835 107,011 107,505
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 63,871 63,426 63,459 63,591 63,541 63,129 63,376
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 40,569 40,391 40,404 40,457 40,437 40,272 40,371
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 24,504 24,415 24,422 24,448 24,438 24,356 24,405
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 80,875 80,519 80,545 80,651 80,611 80,282 80,479
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 48,558 48,380 48,394 48,446 48,426 48,262 48,361
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 95,989 95,701 95,722 95,807 95,775 95,508 95,668
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 57,893 57,749 57,760 57,803 57,786 57,653 57,733
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ###
p 199,331 198,085 198,178 198,547 198,408 197,254 197,947
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### i 119,163 118,540 118,586 118,771 118,702 118,125 118,471
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### o 98,273 97,671 97,715 97,894 97,827 97,269 97,604
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 59,035 58,734 58,756 58,846 58,812 58,533 58,701
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 51,242 50,843 50,873 50,991 50,947 50,578 50,799
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 31,025 30,826 30,841 30,900 30,878 30,693 30,804
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 36,731 36,553 36,566 36,618 36,599 36,434 36,533
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 22,293 22,204 22,211 22,237 22,227 22,145 22,194
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 55,761 55,405 55,432 55,537 55,497 55,168 55,366
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 34,008 33,830 33,844 33,896 33,877 33,712 33,811
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 107,554 107,020 107,060 107,218 107,159 106,664 106,961
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 65,170 64,903 64,923 65,002 64,972 64,725 64,873
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 78,490 78,134 78,160 78,266 78,226 77,897 78,095
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 47,199 47,021 47,034 47,087 47,067 46,903 47,001
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 165,558 164,312 164,405 164,774 164,635 163,482 164,174
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 100,188 99,565 99,611 99,796 99,727 99,150 99,496
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 34,502 34,369 34,379 34,418 34,404 34,281 34,354
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 39,810 39,377 39,409 39,537 39,489 39,088 39,329
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 67,107 66,530 66,573 66,744 66,679 66,145 66,466
5.50 LAVADA DE FACHADA M2 ### 5,584 5,584 5,584 5,584 5,584 5,584 5,584
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 54,079 53,499 53,542 53,714 53,649 53,112 53,434
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,234 11,234 11,234 11,234 11,234 11,234 11,234
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,897 14,897 14,897 14,897 14,897 14,897 14,897
5.54 ANCLAJE 1/2" L=50CM UN ### 19,481 19,481 19,481 19,481 19,481 19,481 19,481
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 27,355 27,355 27,355 27,355 27,355 27,355 27,355
5.56 ANCLAJE 3/4" L=70CM UN ### 40,904 40,904 40,904 40,904 40,904 40,904 40,904
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,344 5,180 5,192 5,241 5,222 5,070 5,161

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,244 17,244 17,244 17,244 17,244 17,244 17,244
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,250 6,117 6,127 6,166 6,151 6,028 6,102
6.3 FILOS O DILATACIONES S/MURO ML ### 7,507 7,374 7,384 7,423 7,408 7,285 7,359
6.4 GOTERA EN MORTERO 1:4 ML ### 8,897 8,764 8,774 8,813 8,798 8,675 8,749
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,412 7,412 7,412 7,412 7,412 7,412 7,412
6.6 MALLA BAJO ENTRAMADO M2 ### 14,684 14,684 14,684 14,684 14,684 14,684 14,684
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 26,290 25,868 25,899 26,024 25,978 25,587 25,821
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,895 15,684 15,699 15,762 15,738 15,543 15,660
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,926 22,552 22,580 22,691 22,649 22,303 22,511
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,884 13,697 13,711 13,766 13,745 13,572 13,676
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 22,165 21,744 21,775 21,900 21,853 21,463 21,697
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,504 13,293 13,308 13,371 13,347 13,152 13,269
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,926 22,552 22,580 22,691 22,649 22,303 22,511
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,884 13,697 13,711 13,766 13,745 13,572 13,676
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 23,462 23,162 23,184 23,273 23,239 22,961 23,128
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 14,151 14,000 14,012 14,056 14,039 13,900 13,984
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 19,039 18,754 18,775 18,859 18,828 18,564 18,722
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,634 11,492 11,503 11,545 11,529 11,397 11,476
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 18,459 18,138 18,162 18,257 18,221 17,924 18,102
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,345 11,184 11,196 11,244 11,226 11,077 11,166
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 23,751 23,377 23,405 23,516 23,474 23,128 23,336
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 14,275 14,088 14,102 14,158 14,137 13,964 14,068
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 22,990 22,569 22,600 22,725 22,678 22,288 22,522
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,895 13,684 13,700 13,762 13,739 13,544 13,661
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ###
p 19,106 18,785 18,809 18,904 18,868 18,571 18,749
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### i 11,649 11,489 11,501 11,548 11,530 11,382 11,471
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### o 23,933 23,511 23,543 23,667 23,621 23,230 23,465
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,795 14,584 14,600 14,662 14,639 14,443 14,561

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 29,216 28,682 28,722 28,880 28,821 28,326 28,623
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7.2 TELA IMPERMEABLE)
M2 ### 90,534 89,416 89,499 89,830 89,706 88,671 89,292
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 60,307 60,307 60,307 60,307 60,307 60,307 60,307
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,975 23,975 23,975 23,975 23,975 23,975 23,975
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 37,668 37,668 37,668 37,668 37,668 37,668 37,668
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 88,170 88,170 88,170 88,170 88,170 88,170 88,170
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 69,008 69,008 69,008 69,008 69,008 69,008 69,008
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 40,071 40,071 40,071 40,071 40,071 40,071 40,071
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 92,412 92,412 92,412 92,412 92,412 92,412 92,412
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 110,379 110,379 110,379 110,379 110,379 110,379 110,379
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 162,287 162,287 162,287 162,287 162,287 162,287 162,287
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 63,994 63,994 63,994 63,994 63,994 63,994 63,994
7.13 CANAL PVC AMAZONAS ML ### 88,848 88,848 88,848 88,848 88,848 88,848 88,848
7.14 CANAL PVC RAINGO ML ### 80,747 80,747 80,747 80,747 80,747 80,747 80,747
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 143,602 143,602 143,602 143,602 143,602 143,602 143,602
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 83,905 83,905 83,905 83,905 83,905 83,905 83,905
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 61,604 61,604 61,604 61,604 61,604 61,604 61,604
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 34,965 34,965 34,965 34,965 34,965 34,965 34,965
7.19000000000001 TEJA DE BARRO M2 ### 64,624 63,960 64,009 64,206 64,132 63,517 63,886
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 51,359 51,359 51,359 51,359 51,359 51,359 51,359
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 47,076 47,076 47,076 47,076 47,076 47,076 47,076
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 39,623 39,623 39,623 39,623 39,623 39,623 39,623
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 38,804 38,804 38,804 38,804 38,804 38,804 38,804
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 39,098 39,098 39,098 39,098 39,098 39,098 39,098
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 55,103 55,103 55,103 55,103 55,103 55,103 55,103
7.26 TEJA PLÁSTICA No.6 M2 ### 48,428 48,428 48,428 48,428 48,428 48,428 48,428
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 88,725 88,725 88,725 88,725 88,725 88,725 88,725
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 163,955 163,955 163,955 163,955 163,955 163,955 163,955
7.29000000000001 TEJA SIN TRASLAPO M2 ### 73,661 73,661 73,661 73,661 73,661 73,661 73,661
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 45,966 45,966 45,966 45,966 45,966 45,966 45,966
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 36,052 36,052 36,052 36,052 36,052 36,052 36,052
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM)
M2 ### 63,019 63,019 63,019 63,019 63,019 63,019 63,019
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,599 21,599 21,599 21,599 21,599 21,599 21,599
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 26,017 26,017 26,017 26,017 26,017 26,017 26,017
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 28,213 28,213 28,213 28,213 28,213 28,213 28,213
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 36,367 36,367 36,367 36,367 36,367 36,367 36,367
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,970 23,970 23,970 23,970 23,970 23,970 23,970
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 56,453 56,453 56,453 56,453 56,453 56,453 56,453
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 388,756 388,756 388,756 388,756 388,756 388,756 388,756
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 439,517 439,517 439,517 439,517 439,517 439,517 439,517
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 294,807 294,807 294,807 294,807 294,807 294,807 294,807
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 315,145 315,145 315,145 315,145 315,145 315,145 315,145

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 497,654 474,676 476,379 483,187 480,634 459,358 472,124
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
8.2 CONCRETO 3500 PSI M3 ###
p 435,622 414,333 415,911 422,218 419,853 400,142 411,969
8.3 CONCRETO 3000 PSI M3 ### i 433,689 411,649 413,282 419,812 417,364 396,956 409,201
8.4 CONCRETO 2500 PSI M3 ### o 384,779 362,422 364,079 370,703 368,219 347,518 359,939
8.5 CONCRETO 2000 PSI M3 ### 360,389 337,338 339,046 345,876 343,315 321,972 334,778
8.6 CONCRETO 1500 PSI M3 ### 329,466 305,634 307,400 314,461 311,813 289,747 302,987
8.7 MORTERO SECO 1:10 M3 ### 273,763 255,431 256,789 262,220 260,184 243,210 253,394
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 502,504 484,703 486,022 491,296 489,318 472,836 482,725
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 466,273 446,202 447,690 453,636 451,407 432,822 443,973
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 532,094 513,323 514,714 520,276 518,190 500,809 511,238
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 778,954 760,183 761,574 767,136 765,050 747,669 758,098

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 133,954 133,954 133,954 133,954 133,954 133,954 133,954
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,400 4,267 4,277 4,316 4,301 4,178 4,252
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 149,759 149,759 149,759 149,759 149,759 149,759 149,759
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 183,553 183,553 183,553 183,553 183,553 183,553 183,553
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 267,401 267,401 267,401 267,401 267,401 267,401 267,401
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 297,661 297,661 297,661 297,661 297,661 297,661 297,661
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 327,955 327,955 327,955 327,955 327,955 327,955 327,955
9.8 HOJA PUERTA FORTEC 0.81 UN ### 217,882 217,882 217,882 217,882 217,882 217,882 217,882
9.9 HOJA PUERTA FORTEC 0.91 UN ### 247,034 247,034 247,034 247,034 247,034 247,034 247,034
9.10 HOJA PUERTA FORTEC 1.50 UN ### 363,644 363,644 363,644 363,644 363,644 363,644 363,644
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 137,712 137,712 137,712 137,712 137,712 137,712 137,712
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 182,899 182,899 182,899 182,899 182,899 182,899 182,899
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 203,306 203,306 203,306 203,306 203,306 203,306 203,306
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 518,153 518,153 518,153 518,153 518,153 518,153 518,153
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 45,723 45,723 45,723 45,723 45,723 45,723 45,723
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 28,397 28,397 28,397 28,397 28,397 28,397 28,397
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 108,086 108,086 108,086 108,086 108,086 108,086 108,086
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 132,497 132,497 132,497 132,497 132,497 132,497 132,497
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 102,907 102,907 102,907 102,907 102,907 102,907 102,907
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 31,833 31,833 31,833 31,833 31,833 31,833 31,833
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 31,833 31,833 31,833 31,833 31,833 31,833 31,833
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 30,171 30,171 30,171 30,171 30,171 30,171 30,171
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 46,117 46,117 46,117 46,117 46,117 46,117 46,117
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 57,158 57,158 57,158 57,158 57,158 57,158 57,158
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 68,936 68,936 68,936 68,936 68,936 68,936 68,936
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 82,922 82,922 82,922 82,922 82,922 82,922 82,922
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 391,148 391,148 391,148 391,148 391,148 391,148 391,148
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 273,372 273,372 273,372 273,372 273,372 273,372 273,372
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 36,547 36,547 36,547 36,547 36,547 36,547 36,547
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 46,852 46,852 46,852 46,852 46,852 46,852 46,852
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 57,158 57,158 57,158 57,158 57,158 57,158 57,158
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 71,880 71,880 71,880 71,880 71,880 71,880 71,880

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 82,697 82,697 82,697 82,697 82,697 82,697 82,697
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 230,740 230,740 230,740 230,740 230,740 230,740 230,740
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 87,445 87,445 87,445 87,445 87,445 87,445 87,445
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 156,136 156,136 156,136 156,136 156,136 156,136 156,136
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 148,333 148,333 148,333 148,333 148,333 148,333 148,333
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 97,384 97,384 97,384 97,384 97,384 97,384 97,384
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 229,707 229,707 229,707 229,707 229,707 229,707 229,707
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ###
p 119,542 119,542 119,542 119,542 119,542 119,542 119,542
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### i 7,165 7,165 7,165 7,165 7,165 7,165 7,165
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO o
10.10 ESTRUCTURAL GALVANIZADO 2")
M2 ### 107,583 107,583 107,583 107,583 107,583 107,583 107,583

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00


10,10(1) MTS
M2 ### 131,643 131,643 131,643 131,643 131,643 131,643 131,643
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 44,309 44,309 44,309 44,309 44,309 44,309 44,309
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 588,638 588,638 588,638 588,638 588,638 588,638 588,638
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 211,462 211,462 211,462 211,462 211,462 211,462 211,462
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 236,873 236,873 236,873 236,873 236,873 236,873 236,873

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y


10.15 ACCESORIOS)
M2 ### 536,450 536,450 536,450 536,450 536,450 536,450 536,450
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 138,996 138,996 138,996 138,996 138,996 138,996 138,996
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 429,405 429,405 429,405 429,405 429,405 429,405 429,405
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,549 6,549 6,549 6,549 6,549 6,549 6,549
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 301,704 301,704 301,704 301,704 301,704 301,704 301,704
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 132,408 132,408 132,408 132,408 132,408 132,408 132,408
10.21 REJILLA PISO 0.30 M M2 ### 93,765 93,765 93,765 93,765 93,765 93,765 93,765
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 96,728 96,728 96,728 96,728 96,728 96,728 96,728
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 11,373 11,373 11,373 11,373 11,373 11,373 11,373
SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
KG ### 12,637 12,637 12,637 12,637 12,637 12,637 12,637
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y
KG ### 10,013 10,013 10,013 10,013 10,013 10,013 10,013
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 239,322 239,322 239,322 239,322 239,322 239,322 239,322
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 289,061 289,061 289,061 289,061 289,061 289,061 289,061
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,975 23,975 23,975 23,975 23,975 23,975 23,975
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 37,668 37,668 37,668 37,668 37,668 37,668 37,668
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 36,093 36,093 36,093 36,093 36,093 36,093 36,093
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 46,316 46,316 46,316 46,316 46,316 46,316 46,316
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 95,609 95,609 95,609 95,609 95,609 95,609 95,609
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 240,806 240,806 240,806 240,806 240,806 240,806 240,806
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,982 46,982 46,982 46,982 46,982 46,982 46,982
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 37,931 37,931 37,931 37,931 37,931 37,931 37,931
11.13 NIPLE PASAMURO 2" UN ### 71,969 71,969 71,969 71,969 71,969 71,969 71,969
11.14 NIPLE PASAMURO 4" UN ### 107,602 107,602 107,602 107,602 107,602 107,602 107,602
11.15 PUNTO AGUA CALIENTE CPVC UN ### 90,986 90,986 90,986 90,986 90,986 90,986 90,986
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 66,152 66,152 66,152 66,152 66,152 66,152 66,152
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 70,418 70,418 70,418 70,418 70,418 70,418 70,418
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 88,992 88,992 88,992 88,992 88,992 88,992 88,992
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 71,867 71,867 71,867 71,867 71,867 71,867 71,867
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ###
p 90,078 90,078 90,078 90,078 90,078 90,078 90,078
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### i 96,389 96,389 96,389 96,389 96,389 96,389 96,389
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### o 80,073 80,073 80,073 80,073 80,073 80,073 80,073
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,552 13,552 13,552 13,552 13,552 13,552 13,552
11.24 RED SUMINISTRO CPVC 3/4" ML ### 19,110 19,110 19,110 19,110 19,110 19,110 19,110
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 24,945 24,945 24,945 24,945 24,945 24,945 24,945
11.26 RED SUMINISTRO PVC 1" ML ### 15,390 15,390 15,390 15,390 15,390 15,390 15,390
11.27 RED SUMINISTRO PVC 1/2" ML ### 9,182 9,182 9,182 9,182 9,182 9,182 9,182
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 55,640 55,640 55,640 55,640 55,640 55,640 55,640
11.29 RED SUMINISTRO PVC 2" ML ### 35,568 35,568 35,568 35,568 35,568 35,568 35,568
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,507 11,507 11,507 11,507 11,507 11,507 11,507
11.31 RED SANITARIA PVC-S 2" ML ### 27,447 27,447 27,447 27,447 27,447 27,447 27,447
11.32 RED SANITARIA PVC-S 3" ML ### 38,102 38,102 38,102 38,102 38,102 38,102 38,102
11.33 RED SANITARIA PVC-S 4" ML ### 51,722 51,722 51,722 51,722 51,722 51,722 51,722
11.34 RED SANITARIA PVC-S 6" ML ### 96,844 96,844 96,844 96,844 96,844 96,844 96,844
11.35 REGISTRO 1" UN ### 117,466 117,466 117,466 117,466 117,466 117,466 117,466
11.36 REGISTRO 1/2" UN ### 65,460 65,460 65,460 65,460 65,460 65,460 65,460
11.37 REGISTRO 3/4" UN ### 83,417 83,417 83,417 83,417 83,417 83,417 83,417
11.38 REGISTRO 1 1/2" UN ### 201,717 201,717 201,717 201,717 201,717 201,717 201,717
11.39 REGISTRO 2 1/2" UN ### 416,311 416,311 416,311 416,311 416,311 416,311 416,311
11.40 REGISTRO 2" UN ### 307,450 307,450 307,450 307,450 307,450 307,450 307,450
11.41 REVENTILACIÓN 2" ML ### 19,119 19,119 19,119 19,119 19,119 19,119 19,119
11.42 REVENTILACIÓN 3" ML ### 24,135 24,135 24,135 24,135 24,135 24,135 24,135

11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 187,768 187,768 187,768 187,768 187,768 187,768 187,768

11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 305,942 305,942 305,942 305,942 305,942 305,942 305,942

11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 509,347 509,347 509,347 509,347 509,347 509,347 509,347

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11.46 SOPORTES) ML ### 43,907 43,907 43,907 43,907 43,907 43,907 43,907

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.47 SOPORTES)
ML ### 51,812 51,812 51,812 51,812 51,812 51,812 51,812

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.48 SOPORTES) ML ### 66,269 66,269 66,269 66,269 66,269 66,269 66,269

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.49 SOPORTES)
ML ### 75,438 75,438 75,438 75,438 75,438 75,438 75,438

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.50 SOPORTES)
ML ### 97,273 97,273 97,273 97,273 97,273 97,273 97,273

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y


11.51 SOPORTES) ML ### 112,195 112,195 112,195 112,195 112,195 112,195 112,195

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y


11.52 SOPORTES)
ML ### 165,662 165,662 165,662 165,662 165,662 165,662 165,662
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 66,806 66,806 66,806 66,806 66,806 66,806 66,806
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 67,081 67,081 67,081 67,081 67,081 67,081 67,081
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 43,296 43,296 43,296 43,296 43,296 43,296 43,296
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 53,442 53,442 53,442 53,442 53,442 53,442 53,442
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,529 4,529 4,529 4,529 4,529 4,529 4,529

11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 7,155 7,155 7,155 7,155 7,155 7,155 7,155
11.59 GABINETE TIPO III UN ### 1,104,304 1,104,304 1,104,304 1,104,304 1,104,304 1,104,304 1,104,304
11.60 GABINETE TIPO I UN ### 842,223 842,223 842,223 842,223 842,223 842,223 842,223
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,848,781
p 2,848,781 2,848,781 2,848,781 2,848,781 2,848,781 2,848,781
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### i 2,374,668 2,374,668 2,374,668 2,374,668 2,374,668 2,374,668 2,374,668
11.63 VÁLVULA MARIPOSA 3" UN ### o 687,034 687,034 687,034 687,034 687,034 687,034 687,034
11.64 VÁLVULA MARIPOSA 4" UN ### 889,936 889,936 889,936 889,936 889,936 889,936 889,936
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 343,545 343,545 343,545 343,545 343,545 343,545 343,545

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 396,275 396,275 396,275 396,275 396,275 396,275 396,275
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 62,968 62,968 62,968 62,968 62,968 62,968 62,968
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 74,570 74,570 74,570 74,570 74,570 74,570 74,570
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 82,756 82,756 82,756 82,756 82,756 82,756 82,756
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 97,506 97,506 97,506 97,506 97,506 97,506 97,506
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 59,181 59,181 59,181 59,181 59,181 59,181 59,181
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 67,478 67,478 67,478 67,478 67,478 67,478 67,478
12.8 STRIP TELEFÓNICO 10 PARES UN ### 155,563 155,563 155,563 155,563 155,563 155,563 155,563
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 60,782 60,782 60,782 60,782 60,782 60,782 60,782
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 139,728 139,728 139,728 139,728 139,728 139,728 139,728
12.11 SALIDA T.V PVC COMPLETA. UN ### 83,535 83,535 83,535 83,535 83,535 83,535 83,535
12.12 SALIDA BIFÁSICA C.N. UN ### 49,537 49,537 49,537 49,537 49,537 49,537 49,537
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 104,318 104,318 104,318 104,318 104,318 104,318 104,318
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 445,326 445,326 445,326 445,326 445,326 445,326 445,326
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 593,360 593,360 593,360 593,360 593,360 593,360 593,360
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,843 3,843 3,843 3,843 3,843 3,843 3,843
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 5,073 5,073 5,073 5,073 5,073 5,073 5,073
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,896 7,896 7,896 7,896 7,896 7,896 7,896
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 14,121 14,121 14,121 14,121 14,121 14,121 14,121
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 296,814 296,814 296,814 296,814 296,814 296,814 296,814
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 83,798 83,798 83,798 83,798 83,798 83,798 83,798
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 113,560 113,560 113,560 113,560 113,560 113,560 113,560
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 46,144 46,144 46,144 46,144 46,144 46,144 46,144
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,518,444 1,518,444 1,518,444 1,518,444 1,518,444 1,518,444 1,518,444
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,124,823 1,124,823 1,124,823 1,124,823 1,124,823 1,124,823 1,124,823
12.26 POSTE METÁLICO 6M UN ### 1,410,304 1,410,304 1,410,304 1,410,304 1,410,304 1,410,304 1,410,304
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 657,602 657,602 657,602 657,602 657,602 657,602 657,602
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 119,798 119,798 119,798 119,798 119,798 119,798 119,798
12.29 LUMINARIA 70W SODIO UN ### 551,809 551,809 551,809 551,809 551,809 551,809 551,809
12.30 LUMINARIA 150W SODIO UN ### 690,468 690,468 690,468 690,468 690,468 690,468 690,468
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,824,378 1,824,378 1,824,378 1,824,378 1,824,378 1,824,378 1,824,378
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,343,362 1,343,362 1,343,362 1,343,362 1,343,362 1,343,362 1,343,362

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 43,645 42,923 42,977 43,191 43,111 42,442 42,843
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 43,457 42,735 42,788 43,002 42,922 42,253 42,654
13.3 ALISTADO PARA LISTÓN M2 ### 15,984 15,840 15,850 15,893 15,877 15,743 15,823
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 31,533 30,089 30,196 30,624 30,464 29,127 29,929
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 93,865 92,421 92,528 92,956 92,795 91,458 92,260
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 28,737 28,276 28,310 28,447 28,395 27,969 28,225
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 62,663 60,428 60,593 61,256 61,007 58,937 60,179
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 87,088 83,511 83,776 84,836 84,439 81,127 83,114
13.9 MANTO FIBERGLASS 600X1 M2 ### 33,115 33,115 33,115 33,115 33,115 33,115 33,115
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,938 24,938 24,938 24,938 24,938 24,938 24,938
13.11 PERMA PLY 2 CAPAS M2 ### 29,234 29,234 29,234 29,234 29,234 29,234 29,234
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 51,063 49,051 49,200 49,796 49,573 47,710 48,828
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ###
p 59,863 57,404 57,586 58,314 58,041 55,764 57,130
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### i 86,876 83,075 83,357 84,483 84,061 80,541 82,653
13.15 TRITURADO FINO 1/2 M3 ### o 114,652 97,542 98,810 103,879 101,978 86,135 95,641
13.16 TRITURADO GRUESO 3/4 M3 ### 122,358 101,770 105,241 104,796 111,530 94,015 94,176

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 62,584 62,295 62,316 62,402 62,370 62,102 62,263
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 37,305 37,160 37,171 37,214 37,198 37,064 37,144
14.3 ADOQUÍN CONCRETO 6CM M2 ### 71,789 71,067 71,121 71,335 71,255 70,586 70,987
14.4 ADOQUÍN CONCRETO 8CM M2 ### 75,439 74,717 74,771 74,985 74,905 74,236 74,637
14.5 ADOQUÍN GRES PEATONAL M2 ### 80,094 79,372 79,425 79,639 79,559 78,891 79,292
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO
M2 ### 82,600 82,311 82,333 82,418 82,386 82,119 82,279
14.7 GRAVILLA PARA GRADAS ML ### 40,221 39,908 39,931 40,024 39,989 39,699 39,873
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 180,379 179,080 179,176 179,561 179,417 178,213 178,935
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 50,557 49,785 49,843 50,071 49,985 49,271 49,700
14.10 GUARDAESCOBA EN GRANITO ML ### 47,536 47,536 47,536 47,536 47,536 47,536 47,536
14.11 GUARDAESCOBA EN GRAVILLA ML ### 11,191 10,877 10,901 10,994 10,959 10,668 10,843
14.12 GUARDAESCOBA PVC CARAMELO ML ### 10,291 10,291 10,291 10,291 10,291 10,291 10,291
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,822 13,822 13,822 13,822 13,822 13,822 13,822
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,473 11,473 11,473 11,473 11,473 11,473 11,473
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 19,278 19,278 19,278 19,278 19,278 19,278 19,278
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 37,645 37,645 37,645 37,645 37,645 37,645 37,645
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,972 9,972 9,972 9,972 9,972 9,972 9,972
14.18 LISTÓN M.H. AMARILLO M2 ### 81,192 81,192 81,192 81,192 81,192 81,192 81,192
14.19 PASO ESCALERA GRANITO ML ### 129,928 128,917 128,992 129,291 129,179 128,243 128,805
14.20 PIRLANES ALUMINIO ML ### 8,133 8,133 8,133 8,133 8,133 8,133 8,133
14.21 PIRLANES LADRILLO ML ### 34,938 34,672 34,692 34,770 34,741 34,495 34,642
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 50,258 50,258 50,258 50,258 50,258 50,258 50,258
14.23 PISO VINILO TRÁFICO PESADO M2 ### 58,449 58,449 58,449 58,449 58,449 58,449 58,449
14.24 PULIDA LACADA PISO MADERA M2 ### 53,591 53,591 53,591 53,591 53,591 53,591 53,591
14.25 TABLETA DE GRES 25X25 M2 ### 54,286 53,998 54,019 54,105 54,072 53,805 53,966
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 60,952 60,663 60,684 60,770 60,738 60,470 60,631
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,870 11,870 11,870 11,870 11,870 11,870 11,870
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 54,356 53,957 53,987 54,105 54,060 53,691 53,913
14.29 JABONERA PORCELANA ACUARIO UN ### 22,563 22,563 22,563 22,563 22,563 22,563 22,563
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14.30 Y PERCHA SIMPLE)
UN ### 135,192 135,192 135,192 135,192 135,192 135,192 135,192
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,785 10,785 10,785 10,785 10,785 10,785 10,785
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 24,607 24,607 24,607 24,607 24,607 24,607 24,607
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,741 15,741 15,741 15,741 15,741 15,741 15,741
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 15,289 15,289 15,289 15,289 15,289 15,289 15,289
14.35 REMATES BOCEL ALUMINIO ML ### 9,254 9,254 9,254 9,254 9,254 9,254 9,254
14.36 REMATES BOCEL PORCELANA ML ### 9,420 9,420 9,420 9,420 9,420 9,420 9,420
14.37 TAPA REGISTRO 20X20 UN ### 20,827 20,827 20,827 20,827 20,827 20,827 20,827
14.38 TAPA REGISTRO 6X6 UN ### 18,969 18,969 18,969 18,969 18,969 18,969 18,969
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 20,553 20,553 20,553 20,553 20,553 20,553 20,553
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN
14.40 SITIO
M2 ### 23,759 23,759 23,759 23,759 23,759 23,759 23,759
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 71,659 71,370 71,391 71,477 71,445 71,177 71,338
14.42 MEDIA CAÑA EN GRANITO ML ### 85,089 85,089 85,089 85,089 85,089 85,089 85,089
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,824 36,824 36,824 36,824 36,824 36,824 36,824
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,482 14,482 14,482 14,482 14,482 14,482 14,482
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 111,909 111,909 111,909 111,909 111,909 111,909 111,909
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ###
p 135,319 135,319 135,319 135,319 135,319 135,319 135,319
i
15 CIELO RASO o
15.1 APLIQUE YESO ML ### 79,926 79,926 79,926 79,926 79,926 79,926 79,926
15.2 ARMADURA MADERA Y MALLA M2 ### 38,944 38,944 38,944 38,944 38,944 38,944 38,944
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 60,470 60,470 60,470 60,470 60,470 60,470 60,470
15.4 CIELO RASO DURACUSTIC M2 ### 74,304 74,304 74,304 74,304 74,304 74,304 74,304
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 55,417 55,417 55,417 55,417 55,417 55,417 55,417
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 102,962 102,962 102,962 102,962 102,962 102,962 102,962
15.7 CORNISAS YESO ML ### 53,675 53,675 53,675 53,675 53,675 53,675 53,675
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 113,905 113,905 113,905 113,905 113,905 113,905 113,905
15.9 MALLA CON VENA M2 ### 14,579 14,579 14,579 14,579 14,579 14,579 14,579

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 111,044 84,680 95,225 74,134 111,044 93,468 58,316
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 123,823 105,224 106,601 112,112 110,045 92,824 103,157
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 151,968 151,968 153,725 150,210 188,877 187,120 151,968
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 116,161 77,511 88,057 79,252 116,161 98,585 63,433
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 141,100 141,100 142,857 139,342 178,009 166,898 141,100
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 148,402 148,402 150,159 146,644 185,311 183,554 148,402

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 331,219 331,219 331,219 331,219 331,219 331,219 331,219

17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 977,863 977,863 977,863 977,863 977,863 977,863 977,863

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 529,519 529,519 529,519 529,519 529,519 529,519 529,519
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 152,847 152,847 152,847 152,847 152,847 152,847 152,847

17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 214,463 214,463 214,463 214,463 214,463 214,463 214,463

17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 199,115 199,115 199,115 199,115 199,115 199,115 199,115
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 439,291 439,291 439,291 439,291 439,291 439,291 439,291
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,124,706 1,124,706 1,124,706 1,124,706 1,124,706 1,124,706 1,124,706
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 318,891 318,891 318,891 318,891 318,891 318,891 318,891
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 225,583 225,583 225,583 225,583 225,583 225,583 225,583
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 89,315 89,315 89,315 89,315 89,315 89,315 89,315
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 273,414 273,414 273,414 273,414 273,414 273,414 273,414

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO


17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 403,143 403,143 403,143 403,143 403,143 403,143 403,143
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
18 PINTURAS
p
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### i 9,043 9,043 9,043 9,043 9,043 9,043 9,043
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### o 3,360 3,360 3,360 3,360 3,360 3,360 3,360
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 12,008 12,008 12,008 12,008 12,008 12,008 12,008
18.4 BARNIZ SOBRE MUEBLES M2 ### 45,892 45,892 45,892 45,892 45,892 45,892 45,892
18.5 CARBURO SOBRE PAÑETES M2 ### 6,296 6,296 6,296 6,296 6,296 6,296 6,296
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 72,073 72,073 72,073 72,073 72,073 72,073 72,073
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,739 3,739 3,739 3,739 3,739 3,739 3,739
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 3,011 3,011 3,011 3,011 3,011 3,011 3,011
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 15,088 15,088 15,088 15,088 15,088 15,088 15,088
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,376 4,376 4,376 4,376 4,376 4,376 4,376
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,912 15,912 15,912 15,912 15,912 15,912 15,912
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,263 6,263 6,263 6,263 6,263 6,263 6,263
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 7,119 7,119 7,119 7,119 7,119 7,119 7,119
18.14 ESTUCO M2 ### 7,562 7,562 7,562 7,562 7,562 7,562 7,562
18.15 ESTUCO (LINEAL) ML ### 4,729 4,729 4,729 4,729 4,729 4,729 4,729
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,782 16,782 16,782 16,782 16,782 16,782 16,782
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,383 10,383 10,383 10,383 10,383 10,383 10,383
18.18 LACA PISOS MADERA M2 ### 24,529 24,529 24,529 24,529 24,529 24,529 24,529
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,902 2,902 2,902 2,902 2,902 2,902 2,902
18.20 MARMOLINA SOBRE PAÑETE M2 ### 13,259 13,259 13,259 13,259 13,259 13,259 13,259
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,574 3,574 3,574 3,574 3,574 3,574 3,574
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,641 13,641 13,641 13,641 13,641 13,641 13,641
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,664 7,664 7,664 7,664 7,664 7,664 7,664
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,808 4,808 4,808 4,808 4,808 4,808 4,808
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 23,726 23,726 23,726 23,726 23,726 23,726 23,726
18.26 PINTURA EPÓXICA M2 ### 13,693 13,693 13,693 13,693 13,693 13,693 13,693
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,446 8,446 8,446 8,446 8,446 8,446 8,446

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,664,398 6,664,398 6,664,398 6,664,398 6,664,398 6,664,398 6,664,398
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR) UN ### 11,774,934 11,774,934 11,774,934 11,774,934 11,774,934 11,774,934 11,774,934
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,081,417 3,081,417 3,081,417 3,081,417 3,081,417 3,081,417 3,081,417
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 10,070,504 10,070,504 10,070,504 10,070,504 10,070,504 10,070,504 10,070,504
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,431,267 9,431,267 9,431,267 9,431,267 9,431,267 9,431,267 9,431,267
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,902 2,902 2,902 2,902 2,902 2,902 2,902
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 945,152 945,152 945,152 945,152 945,152 945,152 945,152
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 94,518 94,518 94,518 94,518 94,518 94,518 94,518
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,711,319 1,711,089 1,711,106 1,711,174 1,711,148 1,710,936 1,711,063
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 737,585 732,075 732,483 734,116 733,504 728,402 731,463

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 31,624 31,624 31,624 31,624 31,624 31,624 31,624
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 47,243 47,243 47,243 47,243 47,243 47,243 47,243
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 58,664 58,664 58,664 58,664 58,664 58,664 58,664
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,959 18,959 18,959 18,959 18,959 18,959 18,959
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 23,037 23,037 23,037 23,037 23,037 23,037 23,037
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 31,482 31,482 31,482 31,482 31,482 31,482 31,482
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,732 27,732 27,732 27,732 27,732 27,732 27,732
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 29,268 29,268 29,268 29,268 29,268 29,268 29,268
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 36,690 36,690 36,690 36,690 36,690 36,690 36,690
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 19,285 19,285 19,285 19,285 19,285 19,285 19,285
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 25,299 25,299 25,299 25,299 25,299 25,299 25,299
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
20.12 VÁLVULA DE BOLA GAS 1" UN ###
p 38,960 38,960 38,960 38,960 38,960 38,960 38,960
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### i 298,810 298,810 298,810 298,810 298,810 298,810 298,810
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### o 344,014 344,014 344,014 344,014 344,014 344,014 344,014
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 358,648 358,648 358,648 358,648 358,648 358,648 358,648
20.16 ACOMETIDA GAS 1/2" ML ### 332,503 332,503 332,503 332,503 332,503 332,503 332,503

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 242,938 242,938 242,938 242,938 242,938 242,938 242,938
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 37,299 37,299 37,299 37,299 37,299 37,299 37,299
21.3 SIRENA DE 110 V UN ### 113,214 113,214 113,214 113,214 113,214 113,214 113,214
21.4 CÁMARA CCTV UN ### 285,925 285,925 285,925 285,925 285,925 285,925 285,925
21.5 PARLANTE-CIELO FALSO UN ### 56,643 56,643 56,643 56,643 56,643 56,643 56,643
21.6 AMPLIFICADOR 100W UN ### 627,214 627,214 627,214 627,214 627,214 627,214 627,214
21.7 AMPLIFICADOR 300W UN ### 1,558,643 1,558,643 1,558,643 1,558,643 1,558,643 1,558,643 1,558,643
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 48,063 48,063 48,063 48,063 48,063 48,063 48,063
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 243,202 243,202 243,202 243,202 243,202 243,202 243,202
21.10 TOMA PARA MICRÓFONO UN ### 47,753 47,753 47,753 47,753 47,753 47,753 47,753
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 4,108 4,108 4,108 4,108 4,108 4,108 4,108
21.12 SPLITERS UN ### 6,924 6,924 6,924 6,924 6,924 6,924 6,924
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 20,091 20,091 20,091 20,091 20,091 20,091 20,091
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 26,335 26,335 26,335 26,335 26,335 26,335 26,335
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 34,258 34,258 34,258 34,258 34,258 34,258 34,258
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 134,456 134,456 134,456 134,456 134,456 134,456 134,456
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 35,070 35,070 35,070 35,070 35,070 35,070 35,070
21.18 BANDEJA PORTACABLES PARA RACK UN ### 114,857 114,857 114,857 114,857 114,857 114,857 114,857
21.19 RACK 2' X 24" UN ### 199,400 199,400 199,400 199,400 199,400 199,400 199,400
21.20 RACK 3' X 24" UN ### 314,553 314,553 314,553 314,553 314,553 314,553 314,553
21.21 RACK 5' X 24" UN ### 390,203 390,203 390,203 390,203 390,203 390,203 390,203
21.22 RACK 7' X 24" UN ### 426,644 426,644 426,644 426,644 426,644 426,644 426,644
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 623,127 623,127 623,127 623,127 623,127 623,127 623,127
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 366,588 366,588 366,588 366,588 366,588 366,588 366,588
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 113,942 113,942 113,942 113,942 113,942 113,942 113,942
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 15,203 15,203 15,203 15,203 15,203 15,203 15,203
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 31,091 31,091 31,091 31,091 31,091 31,091 31,091
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,446 5,446 5,446 5,446 5,446 5,446 5,446
21.29 CANALETA METÁLICA 4X6 CMS ML ### 38,280 38,280 38,280 38,280 38,280 38,280 38,280
21.30 CANALETA METÁLICA 4X10 CMS ML ### 40,016 40,016 40,016 40,016 40,016 40,016 40,016
21.31 CANALETA METÁLICA 6X10 CMS ML ### 40,885 40,885 40,885 40,885 40,885 40,885 40,885
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 26,668 26,668 26,668 26,668 26,668 26,668 26,668
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 29,525 29,525 29,525 29,525 29,525 29,525 29,525
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 30,724 30,724 30,724 30,724 30,724 30,724 30,724
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 51,825 51,825 51,825 51,825 51,825 51,825 51,825
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 671,671 671,671 671,671 671,671 671,671 671,671 671,671
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 344,508 344,508 344,508 344,508 344,508 344,508 344,508
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 96,056 96,056 96,056 96,056 96,056 96,056 96,056
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,996 1,996 1,996 1,996 1,996 1,996 1,996
21.40 CABLE TELEFÓNICO 10 PARES ML ### 9,226 9,226 9,226 9,226 9,226 9,226 9,226
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,793 13,793 13,793 13,793 13,793 13,793 13,793
21.42 CABLE TELEFÓNICO 40 PARES ML ### 23,048 23,048 23,048 23,048 23,048 23,048 23,048
21.43 CABLE TELEVISIÓN RG6 ML ### 4,259 4,259 4,259 4,259 4,259 4,259 4,259
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 24,038 24,038 24,038 24,038 24,038 24,038 24,038
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 35,061 35,061 35,061 35,061 35,061 35,061 35,061
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,971 20,971 20,971 20,971 20,971 20,971 20,971
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### p 16,743 16,743 16,743 16,743 16,743 16,743 16,743
i
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### o 679,086 679,086 679,086 679,086 679,086 679,086 679,086
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
URBANISMO
p
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 29,665 29,665 29,665 29,665 29,665 29,665 29,665
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 99,378 99,378 99,378 99,378 99,378 99,378 99,378
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 560,110 560,110 560,110 560,110 560,110 560,110 560,110
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,195,526 1,195,526 1,195,526 1,195,526 1,195,526 1,195,526 1,195,526
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 136,989 136,989 136,989 136,989 136,989 136,989 136,989
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 834,937 834,937 834,937 834,937 834,937 834,937 834,937
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,797,126 1,797,126 1,797,126 1,797,126 1,797,126 1,797,126 1,797,126
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 14,244 14,244 14,244 14,244 14,244 14,244 14,244
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 17,592 17,592 17,592 17,592 17,592 17,592 17,592
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 22,115 22,115 22,115 22,115 22,115 22,115 22,115
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 24,214 24,214 24,214 24,214 24,214 24,214 24,214
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 29,049 29,049 29,049 29,049 29,049 29,049 29,049
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 29,049 29,049 29,049 29,049 29,049 29,049 29,049
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 117,108 117,108 117,108 117,108 117,108 117,108 117,108
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 135,634 135,634 135,634 135,634 135,634 135,634 135,634
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 419,805 419,805 419,805 419,805 419,805 419,805 419,805
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 157,659 157,659 157,659 157,659 157,659 157,659 157,659
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 259,899 259,899 259,899 259,899 259,899 259,899 259,899
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,150,368 1,150,368 1,150,368 1,150,368 1,150,368 1,150,368 1,150,368
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,325,429 1,325,429 1,325,429 1,325,429 1,325,429 1,325,429 1,325,429
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 15,484 15,484 15,484 15,484 15,484 15,484 15,484
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,654 13,654 13,654 13,654 13,654 13,654 13,654
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 33,881 33,881 33,881 33,881 33,881 33,881 33,881
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 134,226 134,226 134,226 134,226 134,226 134,226 134,226
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 199,992 199,992 199,992 199,992 199,992 199,992 199,992
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 32,631 32,631 32,631 32,631 32,631 32,631 32,631
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 112,490 112,490 112,490 112,490 112,490 112,490 112,490
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 166,802 166,802 166,802 166,802 166,802 166,802 166,802
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 33,003 33,003 33,003 33,003 33,003 33,003 33,003
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 68,075 68,075 68,075 68,075 68,075 68,075 68,075
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 274,406 274,406 274,406 274,406 274,406 274,406 274,406
1.32 UNIÓN REPARACION PVC 4" UN ### 79,445 79,445 79,445 79,445 79,445 79,445 79,445
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 319,300 319,300 319,300 319,300 319,300 319,300 319,300
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 191,165 191,165 191,165 191,165 191,165 191,165 191,165
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 544,876 544,876 544,876 544,876 544,876 544,876 544,876
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,460,442 1,460,442 1,460,442 1,460,442 1,460,442 1,460,442 1,460,442
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,158,010 2,158,010 2,158,010 2,158,010 2,158,010 2,158,010 2,158,010

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,590 11,590 11,590 11,590 11,590 11,590 11,590
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 26,464 26,464 26,464 26,464 26,464 26,464 26,464
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 115,225 95,240 96,719 102,641 100,421 81,916 93,019
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 105,752 79,388 89,934 68,843 105,752 88,176 53,024
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 121,715 83,065 93,610 84,805 121,715 104,139 68,987
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 61,009 61,009 62,034 59,984 82,531 81,506 61,009
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 62,040 62,040 63,085 60,995 83,980 82,935 62,040
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 111,388 94,118 95,398 100,514 98,596 82,606 92,200

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 125,192 125,192 125,192 125,192 125,192 125,192 125,192
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,305,967
p 1,305,967 1,305,967 1,305,967 1,305,967 1,305,967 1,305,967
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### i 163,629 163,629 163,629 163,629 163,629 163,629 163,629
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### o 1,512,659 1,512,659 1,512,659 1,512,659 1,512,659 1,512,659 1,512,659
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,054,253 1,054,253 1,054,253 1,054,253 1,054,253 1,054,253 1,054,253
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 64,081 64,081 64,081 64,081 64,081 64,081 64,081
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 124,276 124,276 124,276 124,276 124,276 124,276 124,276
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 293,532 293,532 293,532 293,532 293,532 293,532 293,532
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 293,526 293,526 293,526 293,526 293,526 293,526 293,526
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 471,286 471,286 471,286 471,286 471,286 471,286 471,286
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 124,328 124,328 124,328 124,328 124,328 124,328 124,328
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 124,328 124,328 124,328 124,328 124,328 124,328 124,328
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 293,532 293,532 293,532 293,532 293,532 293,532 293,532
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 293,532 293,532 293,532 293,532 293,532 293,532 293,532
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 471,286 471,286 471,286 471,286 471,286 471,286 471,286
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 471,701 471,701 471,701 471,701 471,701 471,701 471,701
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 766,956 766,956 766,956 766,956 766,956 766,956 766,956
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,231,349 1,231,349 1,231,349 1,231,349 1,231,349 1,231,349 1,231,349
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 76,155 76,155 76,155 76,155 76,155 76,155 76,155
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 394,447 394,447 394,447 394,447 394,447 394,447 394,447
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 443,858 443,858 443,858 443,858 443,858 443,858 443,858
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,226,960 1,226,960 1,226,960 1,226,960 1,226,960 1,226,960 1,226,960
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 71,892 71,714 71,727 71,780 71,760 71,595 71,694
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 357,426 357,426 357,426 357,426 357,426 357,426 357,426
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 54,575 54,575 54,575 54,575 54,575 54,575 54,575
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 77,213 77,213 77,213 77,213 77,213 77,213 77,213
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 111,456 111,456 111,456 111,456 111,456 111,456 111,456
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 171,103 171,103 171,103 171,103 171,103 171,103 171,103
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 275,048 275,048 275,048 275,048 275,048 275,048 275,048
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 398,156 398,156 398,156 398,156 398,156 398,156 398,156
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 504,115 504,115 504,115 504,115 504,115 504,115 504,115
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 662,936 662,936 662,936 662,936 662,936 662,936 662,936
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 912,383 912,383 912,383 912,383 912,383 912,383 912,383

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO)
UN ### 725,979 712,755 713,735 717,653 716,184 703,939 711,286

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE


4.2 INTERNO E=1.5CM Y CAÑUELA)
ML ### 709,190 699,992 700,674 703,399 702,377 693,860 698,970

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO


4.3 (INCLUYE ARO Y TAPA HF)
UN ### 774,001 765,185 765,838 768,450 767,471 759,308 764,206

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON


4.4 REFUERZO)
UN ### 862,883 846,353 847,577 852,475 850,639 835,333 844,517

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE


4.5 INTERNO E=1.5CM Y CAÑUELA)
ML ### 1,008,473 995,521 996,481 1,000,318 998,879 986,886 994,082

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO


4.6 (INCLUYE ARO Y TAPA HF)
UN ### 894,139 882,017 882,915 886,507 885,160 873,936 880,671
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,068,249 1,061,895 1,062,368 1,064,249 1,063,541 1,057,660 1,061,191
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,552,537 1,534,016 1,535,393 1,540,877 1,538,817 1,521,672 1,531,963
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,136,109 2,101,179 2,103,768 2,114,116 2,110,236 2,077,895 2,097,300
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,830,340 2,772,277 2,776,580 2,793,782 2,787,332 2,733,572 2,765,829
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,994,846 1,994,846 1,994,846 1,994,846 1,994,846 1,994,846 1,994,846
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,223,789 4,223,789 4,223,789 4,223,789 4,223,789 4,223,789 4,223,789
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 149,176 148,800 148,828 148,939 148,898 148,550 148,759
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
p
5 ANDENES Y SARDINELES i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### o 79,811 78,881 78,950 79,226 79,122 78,261 78,778
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 94,579 93,649 93,718 93,994 93,890 93,029 93,546
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 60,646 58,299 58,473 59,168 58,907 56,734 58,038
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 65,782 63,468 63,639 64,325 64,068 61,925 63,211
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 65,985 63,749 63,915 64,577 64,329 62,259 63,501
5.6 BORDE SEPARADOR VERDE A-170 ML ### 276,507 276,132 276,160 276,271 276,229 275,882 276,090
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,737 19,455 19,476 19,559 19,528 19,267 19,424
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 43,362 41,708 41,830 42,320 42,137 40,605 41,524
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 90,497 90,296 90,311 90,370 90,348 90,162 90,274
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 604,144 598,675 599,080 600,701 600,093 595,028 598,067
5.11 LOSETA PREFABRICADA A-40 M2 ### 68,051 67,192 67,255 67,510 67,414 66,619 67,096
5.12 LOSETA PREFABRICADA A-60 M2 ### 98,903 98,044 98,108 98,362 98,267 97,471 97,949
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 36,069 35,144 35,212 35,487 35,384 34,527 35,041
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 58,183 56,309 56,448 57,003 56,795 55,060 56,101
5.15 SARDINEL PREFABRICADO A-10 ML ### 106,715 106,515 106,729 106,390 110,746 110,361 106,492
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 65,415 64,895 64,934 65,088 65,030 64,549 64,838

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 220,383 219,281 219,363 219,690 219,567 218,547 219,159
6.2 BANCA EN CONCRETO M-30 UN ### 724,849 723,306 723,420 723,877 723,706 722,278 723,135
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 232,963 232,733 232,750 232,818 232,792 232,579 232,707
6.4 BOLARDO M-60 CONCRETO UN ### 175,522 174,199 174,297 174,689 174,542 173,318 174,052
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 177,501 176,179 176,277 176,669 176,522 175,297 176,032
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 208,323 206,939 207,042 207,452 207,298 206,017 206,786
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 63,675 62,963 63,016 63,227 63,148 62,488 62,884
6.8 BORDILLO PREFABRICADO A-80 ML ### 74,154 73,357 73,416 73,652 73,564 72,826 73,268
6.9 CANECA M-120 UN ### 339,114 338,936 338,950 339,002 338,983 338,818 338,917
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 893,909 893,248 893,297 893,493 893,419 892,807 893,175
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,672,284 3,671,843 3,671,876 3,672,007 3,671,958 3,671,549 3,671,794
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,777,793 3,777,352 3,777,385 3,777,516 3,777,467 3,777,058 3,777,303
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 528,005 527,544 527,578 527,715 527,664 527,237 527,493
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 699,635 697,791 697,928 698,474 698,269 696,562 697,586
6.15 BANCA EN MADERA M-50 UN ### 580,737 580,737 580,737 580,737 580,737 580,737 580,737
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 268,513 267,852 267,901 268,097 268,023 267,411 267,778
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 625,647 625,202 625,235 625,367 625,318 624,906 625,153
6.18 POSTE HISTÓRICO M-131 UN ### 6,979,865 6,976,559 6,976,803 6,977,783 6,977,416 6,974,355 6,976,191

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,384 4,384 4,384 4,384 4,384 4,384 4,384
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 46,751 46,751 46,751 46,751 46,751 46,751 46,751
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 340,456 340,268 340,282 340,337 340,317 340,143 340,247
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 534,880 533,958 534,027 534,300 534,197 533,344 533,856
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 252,889 252,702 252,715 252,771 252,750 252,576 252,681
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 268,719 268,532 268,545 268,601 268,580 268,406 268,511
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 280,706 280,519 280,532 280,588 280,567 280,393 280,498
7.8 TACHAS REFLECTIVAS UN ### 14,641 14,641 14,641 14,641 14,641 14,641 14,641
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,642 15,642 15,642 15,642 15,642 15,642 15,642
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN)
UN ### 127,840 127,840 127,840 127,840 127,840 127,840 127,840
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
VÍAS (SEGÚN ESPECIFICACIONESp TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES


1.2 201 P A UNA DISTANCIA DE 5KM) M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE


1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO


1.4 200.2 DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A


1.5 201.7 UNA DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,


1.6 *** SOBREACARREOS Y DERRUMBES
M3-KM### 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,800 36,800 36,800 36,800 36,800 36,800 36,800
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS
M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494 494 494 494 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A


2.9 600.1 UNA DISTANCIA MENOR DE 5 KM)
M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A


2.10 600.2 UNA DISTANCIA MENOR DE 5 KM) M3 ### 67,419 67,419 67,419 67,419 67,419 67,419 67,419

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE


2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 82,585 82,585 82,585 82,585 82,585 82,585 82,585

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE


2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE


2.13 600.4 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO


2.14 600.5 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE


2.15 600.5 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 141,100 141,100 142,857 139,342 178,009 166,898 141,100
3.3 330.1 BASE GRANULAR M3 ### 148,402 148,402 150,159 146,644 185,311 183,554 148,402
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,471 3,471 3,471 3,471 3,471 3,471 3,471
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,190 1,190 1,190 1,190 1,190 1,190 1,190
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 244,702 239,438 239,828 241,388 240,803 235,929 238,853
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 72,219 70,906 71,003 71,392 71,246 70,030 70,760
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 653,038 671,628 637,828 722,328 698,668 691,908 671,628
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### p 680,673 699,263 665,463 749,963 726,303 719,543 699,263
i
o
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 720,714 739,304 705,504 790,004 766,344 759,584 739,304

3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 688,349 706,939 673,139 757,639 733,979 727,219 706,939

3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### 273,133 279,910 262,864 295,933 307,052 284,690 298,894
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 309,446 309,446 311,204 307,689 346,356 344,598 309,446
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 300,672 300,672 302,429 298,914 337,581 326,470 300,672
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 41,393 41,393 41,393 41,393 41,393 41,393 41,393

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 184,831 184,831 184,831 184,831 184,831 184,831 184,831
3.15 311.1 AFIRMADO M3 ### 116,161 77,511 88,057 79,252 116,161 98,585 63,433
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,843 12,462 12,491 12,603 12,561 12,209 12,420
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,225 5,034 5,049 5,105 5,084 4,908 5,013
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3.18 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 686,443 665,639 667,180 673,344 671,033 651,770 663,328

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y


3.19 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 721,407 699,671 701,282 707,722 705,307 685,181 697,257

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y


3.20 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 744,565 722,230 723,885 730,503 728,021 707,341 719,750

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE


3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,545 7,545 7,545 7,545 7,545 7,545 7,545
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 93,434 93,434 94,922 91,947 124,666 123,178 93,434

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 975,218 951,619 953,368 960,360 957,738 935,887 948,998
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 840,909 817,701 819,421 826,297 823,718 802,230 815,123
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 890,240 866,113 867,901 875,050 872,369 850,029 863,433
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 612,685 591,183 592,777 599,147 596,759 576,851 588,796
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 714,489 692,136 693,793 700,415 697,932 677,235 689,654
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 610,733 588,473 590,122 596,717 594,245 573,633 586,000
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 712,460 689,318 691,032 697,889 695,318 673,890 686,747
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 776,304 754,044 755,693 762,288 759,816 739,204 751,571
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 631,388 608,246 609,961 616,818 614,247 592,819 605,676
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 823,077 799,935 801,649 808,506 805,935 784,507 797,364
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P ACERO A-36 KG ### 12,644 12,644 12,644 12,644 12,644 12,644 12,644

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE


4.12 650 P ACERO A-588 GRADO B
KG ### 16,277 16,277 16,277 16,277 16,277 16,277 16,277
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,910 1,910 1,910 1,910 1,910 1,910 1,910
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO
4.14 621.1 TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,868,004 2,868,004 2,868,004 2,868,004 2,868,004 2,868,004 2,868,004

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN


4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,371,106 4,330,740 4,333,731 4,345,691 4,341,206 4,303,830 4,326,256
REFUERZO Y ANILLOS)

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,811,142 1,789,102 1,790,735 1,797,265 1,794,817 1,774,409 1,786,654
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3)### 94,248 94,248 94,248 94,248 94,248 94,248 94,248
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 384,380 381,735 381,931 382,714 382,421 379,972 381,441
4.19 632 P BARANDA METÁLICA ML ### 452,834 452,834 452,834 452,834 452,834 452,834 452,834
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 18,282 18,282 18,282 18,282 18,282 18,282 18,282
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 543,871 497,059 505,255 506,659 526,814 494,676 485,838
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ###
p 77,033 77,033 78,520 75,546 108,264 106,777 77,033
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### i 108,447 84,111 93,846 74,377 108,447 92,223 59,775
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### o 412,454 389,173 390,898 397,796 395,210 373,653 386,587
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 388,018 374,188 375,753 378,770 389,131 375,784 372,652

4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 396,689 382,859 384,424 387,441 397,802 384,455 381,323

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 402,652 389,238 390,773 393,666 404,073 391,112 387,748
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 411,323 397,909 399,444 402,337 412,744 399,783 396,419
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 555,172 532,592 534,265 540,955 538,447 517,539 530,084
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 654,942 631,468 633,207 640,163 637,554 615,818 628,860
4.31 681.1 GAVIÓN M3 ### 188,412 188,412 189,832 186,992 218,224 216,804 188,412
4.32 681.1 GAVIÓN MALLA PVC M3 ### 192,931 192,931 194,350 191,511 222,742 221,323 192,931

4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 45,344 43,958 44,060 44,471 44,317 43,034 43,804

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500


4.34 672.1 PSI
ML ### 17,578 16,885 16,936 17,141 17,064 16,423 16,808

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO


4.35 *** (RESISTENCIA ÚLTIMA 25 KN)
M2 ### 10,919 10,919 10,919 10,919 10,919 10,919 10,919

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 15,584 15,584 15,584 15,584 15,584 15,584 15,584

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 20,985 20,985 20,985 20,985 20,985 20,985 20,985

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 25,164 25,164 25,164 25,164 25,164 25,164 25,164

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.39 *** (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 32,346 32,346 32,346 32,346 32,346 32,346 32,346

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,


4.40 *** FILTRO Y SEPARACIÓN)
M2 ### 7,837 7,837 7,837 7,837 7,837 7,837 7,837

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,


4.41 *** FILTRO Y SEPARACIÓN) M2 ### 8,933 8,933 8,933 8,933 8,933 8,933 8,933

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN,


4.42 *** FILTRO Y SEPARACIÓN)
M2 ### 9,287 9,287 9,287 9,287 9,287 9,287 9,287

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,


4.43 *** FILTRO Y SEPARACIÓN) M2 ### 6,609 6,609 6,609 6,609 6,609 6,609 6,609

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,


4.44 *** FILTRO Y SEPARACIÓN)
M2 ### 9,966 9,966 9,966 9,966 9,966 9,966 9,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u MAGDALENA CENTRO
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Beltrán Bituima Chaguaní Guayabal_de_Síquima Pulí San_Juan_de_Rioseco Vianí
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, p
4.45 *** FILTRO Y SEPARACIÓN) M2 ### 8,123 8,123 8,123 8,123 8,123 8,123 8,123
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, o
4.46 *** FILTRO Y SEPARACIÓN)
M2 ### 9,966 9,966 9,966 9,966 9,966 9,966 9,966

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN,


4.47 *** FILTRO Y SEPARACIÓN) M2 ### 19,171 19,171 19,171 19,171 19,171 19,171 19,171

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36"


4.48 661.1 CLASE I, INCLUYE EMBOQUILLADA
ML ### 682,060 681,769 681,790 681,877 681,844 681,574 681,736

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600


4.49 660.3 MM ML ### 391,924 386,938 387,308 388,785 388,231 383,615 386,385

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO


4.50 *** 36"
ML ### 955,333 955,333 955,333 955,333 955,333 955,333 955,333
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 185,801 148,637 158,777 150,311 185,801 168,901 135,101
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,790 4,790 4,790 4,790 4,790 4,790 4,790
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4.53 *** INSTALACIÓN) ML ### 93,038 93,038 93,038 93,038 93,038 93,038 93,038
GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4.54 *** INSTALACIÓN)
ML ### 141,787 141,787 141,787 141,787 141,787 141,787 141,787
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 564,402 540,927 542,667 549,622 547,014 525,278 538,320
4.56 682.1 P COLCHONETA RENO M3 ### 205,386 205,386 206,806 203,966 235,198 233,778 205,386
4.57 *** TRINCHO EN MADERA M2 ### 73,589 73,589 73,589 73,589 73,589 73,589 73,589

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,384 4,384 4,384 4,384 4,384 4,384 4,384
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 46,751 46,751 46,751 46,751 46,751 46,751 46,751
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 90,755 90,755 90,755 90,755 90,755 90,755 90,755
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 75,479 75,479 75,479 75,479 75,479 75,479 75,479
5.5 730.1 DEFENSA METÁLICA ML ### 160,373 159,178 159,267 159,621 159,488 158,382 159,046
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 14,641 14,641 14,641 14,641 14,641 14,641 14,641

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 874 874 874 874 874 874 874
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36",
6.2 801.6 INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847
DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE


6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 16,155 16,155 16,155 16,155 16,155 16,155 16,155
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 26,253 26,253 26,253 26,253 26,253 26,253 26,253
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,800 9,800 9,800 9,800 9,800 9,800 9,800
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
CONSTRUCCIÓN p
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,041,319 2,091,627
1.2 CAMPAMENTO 9 M2 UN ### 1,195,687 1,220,841
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,810 14,810
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,600 16,600
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,208 19,208
1.6 CERCA EN TABLA H=2.30 M ML ### 68,182 68,182
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 47,514 48,085
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,866 22,437
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 937,976 942,690
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 10,717 10,717
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,899 3,899
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,783,983 2,783,983
1.44 RED TELEFÓNICA PROVISIONAL UN ### 258,320 258,320
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 189,006 171,430
2.2 BASE ARENA CEMENTO 1:20 M3 ### 170,447 221,582
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ###
p 217,047 217,047
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### i 23,002 23,002
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### o 623,718 679,041
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 626,014 684,427
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 583,194 637,889
2.9 PILOTE DE MADERA D=20 CM ML ### 51,115 51,115
2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 157,855 157,855

2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 197,024 197,024

2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 244,391 244,391

2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 308,154 308,154
2.14 PILOTE HINCADO 25X25 ML ### 105,577 109,664
2.15 PILOTE HINCADO 30X30 ML ### 129,721 135,643
2.16 DADOS EN CONCRETO 3500PSI M3 ### 568,196 622,891
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 94,590 94,590

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 39,772 40,090
3.2 SIFÓN EN PVC 6" UN ### 205,016 205,334
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 503,556 513,830
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 233,408 238,463
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 264,653 273,152
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 341,373 356,576
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 110,741 110,641
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,334,581 1,333,586
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 118,031 121,541
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 74,487 76,338
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,175 28,969
3.12 TUBERÍA DRENAJE PVC 160 ML ### 45,784 46,578
3.13 TUBERÍA DRENAJE PVC 200 ML ### 59,940 61,052
3.14 TUBERÍA DRENAJE PVC 250 ML ### 82,206 83,476
3.15 TUBERÍA DRENAJE PVC 315 ML ### 114,317 115,428
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 977,497 990,201
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,372,214 1,397,622
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,766,456 1,817,274

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 43,910 43,910
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 57,876 57,876
4.3 COLUMNAS 3500 PSI M3 ### 798,777 853,472
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 241,903 269,296
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.5 PSI
M2 ### 98,162 103,472

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500
4.6 PSI
M2 ### 115,596 121,968
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 128,553 137,049
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 135,576 144,603
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 154,596 165,748
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 171,640 184,385
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 190,347 204,684
4.12 ENTREPISO VIGUETA PLACA M2 ### 102,832 103,687
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
4.13 ESCALERA MACIZA 3500 PSI M3 ###
p 953,072 1,007,767
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### i 98,668 99,633
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### o 78,215 83,685
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 87,539 94,230
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 101,482 109,872
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 694,424 749,119
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 50,589 52,318
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 273,363 297,790
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,349 4,349
4.22 ACERO FIGURADO 60000 PSI KG ### 4,561 4,561
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,441 6,441
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 849,696 904,391
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 764,743 824,576
4.26 VIGA AÉREA 3500 PSI M3 ### 840,649 895,344
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 819,352 874,047
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,042,200 1,096,895
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 283,528 341,101

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,179 31,649
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 51,752 53,222
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,618 36,936
5.4 ARCOS EN LADRILLO PRENSADO ML ### 171,906 172,541
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,084 46,813
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,156 29,122
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 102,411 103,682
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 90,629 96,392
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,597 95,597
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 56,198 56,198
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 92,101 92,101
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,449 54,449
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 106,563 106,563
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 63,081 63,081
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 118,431 118,431
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 69,015 69,015
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,198 42,837
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,672 25,991
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 55,091 55,517
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,248 33,461
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 62,013 62,439
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,422 37,635
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 102,153 104,281
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 60,700 61,764
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 38,804 39,229
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,622 23,834
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 77,076 77,927
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 46,659 47,084
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 91,483 92,449
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 55,640 56,123
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 187,789 190,768
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 113,392 114,882
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 92,644 93,968
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,221 56,883
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 48,443 49,396
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ###
p 29,626 30,102
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### i 35,162 35,587
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### o 21,509 21,722
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 52,816 53,667
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,536 32,961
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 102,035 103,312
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,411 63,049
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 74,557 75,408
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,197 45,623
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 155,826 158,805
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 95,271 96,761
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 33,087 33,404
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 37,328 38,281
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 63,350 64,621
5.50 LAVADA DE FACHADA M2 ### 5,548 5,548
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 52,131 53,601
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,164 11,164
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,680 14,680
5.54 ANCLAJE 1/2" L=50CM UN ### 19,160 19,160
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,700 26,700
5.56 ANCLAJE 3/4" L=70CM UN ### 39,650 39,650
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 4,829 5,230

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,042 17,042
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,852 6,169
6.3 FILOS O DILATACIONES S/MURO ML ### 7,109 7,426
6.4 GOTERA EN MORTERO 1:4 ML ### 8,440 8,758
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,139 7,139
6.6 MALLA BAJO ENTRAMADO M2 ### 14,419 14,419
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,828 25,755
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,163 15,627
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,623 22,517
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,233 13,680
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 20,703 21,630
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,772 13,236
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,623 22,517
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,233 13,680
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,122 22,783
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,481 13,811
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,046 18,727
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,138 11,479
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,345 18,051
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,788 11,141
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,448 23,342
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,624 14,071
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,528 22,455
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,164 13,627
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,992 18,698
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,092 11,445
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,471 23,398
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,064 14,527

7 CUBIERTAS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ###
p 27,355 28,632
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### i 84,492 87,373
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### o 57,581 57,581
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,130 23,130
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,255 36,255
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 83,979 83,979
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 65,875 65,875
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,538 38,538
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 87,985 87,985
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 104,957 104,957
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 153,995 153,995
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 61,236 61,236
7.13 CANAL PVC AMAZONAS ML ### 85,308 85,308
7.14 CANAL PVC RAINGO ML ### 77,651 77,651
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 136,876 136,876
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 79,812 79,812
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 58,744 58,744
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,907 33,907
7.19000000000001 TEJA DE BARRO M2 ### 61,139 62,727
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 48,956 48,956
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 44,910 44,910
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,214 38,214
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 37,388 37,388
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,665 37,665
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 52,740 52,740
7.26 TEJA PLÁSTICA No.6 M2 ### 46,434 46,434
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 84,600 84,600
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 155,738 155,738
7.29000000000001 TEJA SIN TRASLAPO M2 ### 70,192 70,192
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,792 44,792
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,969 34,969
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 60,446 60,446
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,096 21,096
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,269 25,269
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,298 27,298
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,002 35,002
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,241 23,241
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,645 54,645
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 367,976 367,976
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 428,636 428,636
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 281,567 281,567
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 300,279 300,279

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 426,367 485,592
8.2 CONCRETO 3500 PSI M3 ### 369,064 422,166
8.3 CONCRETO 3000 PSI M3 ### 364,707 418,419
8.4 CONCRETO 2500 PSI M3 ### 321,017 378,642
8.5 CONCRETO 2000 PSI M3 ### 293,833 350,924
8.6 CONCRETO 1500 PSI M3 ### 259,252 315,149
8.7 MORTERO SECO 1:10 M3 ### 219,979 263,809
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 440,476 483,036
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 396,647 440,794
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ###
p 461,988 503,277
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### i 695,208 736,497
o
9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 128,422 128,422
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,948 4,266
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 144,104 144,104
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 176,029 176,029
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 254,176 254,176
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 282,800 282,800
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 311,458 311,458
9.8 HOJA PUERTA FORTEC 0.81 UN ### 206,595 206,595
9.9 HOJA PUERTA FORTEC 0.91 UN ### 234,135 234,135
9.10 HOJA PUERTA FORTEC 1.50 UN ### 344,296 344,296
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 130,860 130,860
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 173,547 173,547
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 192,825 192,825
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 490,259 490,259
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,016 44,016
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,648 27,648
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,099 104,099
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 125,567 125,567
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 97,613 97,613
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,470 30,470
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,470 30,470
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,901 28,901
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,285 44,285
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 54,715 54,715
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 65,841 65,841
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 79,054 79,054
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 370,792 370,792
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 259,529 259,529
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,244 35,244
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 44,980 44,980
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 54,715 54,715
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 68,623 68,623

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 79,437 79,437
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 219,292 219,292
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 84,359 84,359
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 151,880 151,880
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 142,758 142,758
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 93,749 93,749
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 220,461 220,461
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,121 115,121
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,923 6,923
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 104,916 104,916
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 126,071 126,071
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 43,171 43,171
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 558,470 558,470
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 201,409 201,409
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 227,062 227,062
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ###
p 509,846 509,846
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### i 135,062 135,062
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### o 406,969 406,969
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,318 6,318
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 286,894 286,894
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 128,370 128,370
10.21 REJILLA PISO 0.30 M M2 ### 89,958 89,958
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,021 93,021
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 11,069 11,069
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,


10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 12,262 12,262
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,


10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,783 9,783
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 232,408 232,408
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 279,394 279,394
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,130 23,130
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 36,255 36,255
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,888 34,888
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,626 44,626
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 91,727 91,727
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 233,809 233,809
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,913 46,913
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 36,887 36,887
11.13 NIPLE PASAMURO 2" UN ### 70,518 70,518
11.14 NIPLE PASAMURO 4" UN ### 105,264 105,264
11.15 PUNTO AGUA CALIENTE CPVC UN ### 88,483 88,483
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 65,020 65,020
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 69,049 69,049
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 87,229 87,229
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 70,000 70,000
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 87,205 87,205
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 93,166 93,166
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 76,794 76,794
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,055 13,055
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,307 18,307
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,917 23,917
11.26 RED SUMINISTRO PVC 1" ML ### 14,820 14,820
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,885 8,885
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 53,089 53,089
11.29 RED SUMINISTRO PVC 2" ML ### 34,023 34,023
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,104 11,104
11.31 RED SANITARIA PVC-S 2" ML ### 26,350 26,350
11.32 RED SANITARIA PVC-S 3" ML ### 36,501 36,501
11.33 RED SANITARIA PVC-S 4" ML ### 49,494 49,494
11.34 RED SANITARIA PVC-S 6" ML ### 92,120 92,120
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
11.35 REGISTRO 1" UN ###
p 112,234 112,234
11.36 REGISTRO 1/2" UN ### i 62,630 62,630
11.37 REGISTRO 3/4" UN ### o 79,595 79,595
11.38 REGISTRO 1 1/2" UN ### 191,825 191,825
11.39 REGISTRO 2 1/2" UN ### 394,866 394,866
11.40 REGISTRO 2" UN ### 292,026 292,026
11.41 REVENTILACIÓN 2" ML ### 18,413 18,413
11.42 REVENTILACIÓN 3" ML ### 23,222 23,222
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 180,545 180,545
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 293,236 293,236
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 487,499 487,499
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 42,015 42,015
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 49,540 49,540
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 63,754 63,754
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 72,193 72,193
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 93,021 93,021
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 108,042 108,042
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 159,821 159,821
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,709 64,709
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,969 64,969
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,643 41,643
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 51,227 51,227
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,320 4,320
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,801 6,801
11.59 GABINETE TIPO III UN ### 1,052,869 1,052,869
11.60 GABINETE TIPO I UN ### 805,283 805,283
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,699,273 2,699,273
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,251,381 2,251,381
11.63 VÁLVULA MARIPOSA 3" UN ### 657,108 657,108
11.64 VÁLVULA MARIPOSA 4" UN ### 848,788 848,788
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 325,216 325,216

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 378,253 378,253
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 60,087 60,087
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 71,051 71,051
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 78,980 78,980
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 92,919 92,919
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 56,539 56,539
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 64,413 64,413
12.8 STRIP TELEFÓNICO 10 PARES UN ### 149,232 149,232
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 58,021 58,021
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 133,233 133,233
12.11 SALIDA T.V PVC COMPLETA. UN ### 79,769 79,769
12.12 SALIDA BIFÁSICA C.N. UN ### 47,287 47,287
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 99,916 99,916
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 426,871 426,871
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 568,068 568,068
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,676 3,676
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,857 4,857
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,549 7,549
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,509 13,509
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 283,609 283,609
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 80,310 80,310
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ###
p 108,426 108,426
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### i 44,739 44,739
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### o 1,456,721 1,456,721
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,079,474 1,079,474
12.26 POSTE METÁLICO 6M UN ### 1,341,294 1,341,294
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 623,338 623,338
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 114,437 114,437
12.29 LUMINARIA 70W SODIO UN ### 522,794 522,794
12.30 LUMINARIA 150W SODIO UN ### 653,783 653,783
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,725,058 1,725,058
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,270,642 1,270,642

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 40,408 41,996
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 39,894 41,482
13.3 ALISTADO PARA LISTÓN M2 ### 15,292 15,610
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 26,789 29,965
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 85,945 89,121
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,310 28,452
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 56,155 61,917
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 76,679 85,899
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,782 31,782
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,243 24,243
13.11 PERMA PLY 2 CAPAS M2 ### 28,522 28,522
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 45,258 50,444
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 52,783 59,121
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 75,904 85,700
13.15 TRITURADO FINO 1/2 M3 ### 61,712 94,426
13.16 TRITURADO GRUESO 3/4 M3 ### 96,261 120,231

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 59,576 60,211
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,799 36,116
14.3 ADOQUÍN CONCRETO 6CM M2 ### 67,394 68,982
14.4 ADOQUÍN CONCRETO 8CM M2 ### 70,844 72,432
14.5 ADOQUÍN GRES PEATONAL M2 ### 75,329 76,917
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 78,418 79,053
14.7 GRAVILLA PARA GRADAS ML ### 39,121 39,729
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 169,270 172,128
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 47,863 49,397
14.10 GUARDAESCOBA EN GRANITO ML ### 46,550 46,550
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,203 10,812
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,798 9,798
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,133 13,133
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,113 11,113
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,487 18,487
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,837 35,837
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,858 9,858
14.18 LISTÓN M.H. AMARILLO M2 ### 78,343 78,343
14.19 PASO ESCALERA GRANITO ML ### 123,303 125,527
14.20 PIRLANES ALUMINIO ML ### 8,096 8,096
14.21 PIRLANES LADRILLO ML ### 33,567 34,203
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,081 48,081
14.23 PISO VINILO TRÁFICO PESADO M2 ### 55,788 55,788
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
14.24 PULIDA LACADA PISO MADERA M2 ###
p 51,950 51,950
14.25 TABLETA DE GRES 25X25 M2 ### i 51,668 52,304
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### o 57,966 58,601
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,651 11,651
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 51,554 52,507
14.29 JABONERA PORCELANA ACUARIO UN ### 21,628 21,628
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 129,084 129,084
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,600 10,600
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,657 23,657
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,281 15,281
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,854 14,854
14.35 REMATES BOCEL ALUMINIO ML ### 9,134 9,134
14.36 REMATES BOCEL PORCELANA ML ### 9,289 9,289
14.37 TAPA REGISTRO 20X20 UN ### 20,086 20,086
14.38 TAPA REGISTRO 6X6 UN ### 18,331 18,331
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 19,416 19,416
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 22,445 22,445
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 67,899 68,534
14.42 MEDIA CAÑA EN GRANITO ML ### 80,820 80,820
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,613 36,613
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,999 13,999
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 105,858 105,858
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 128,397 128,397

15 CIELO RASO
15.1 APLIQUE YESO ML ### 75,975 75,975
15.2 ARMADURA MADERA Y MALLA M2 ### 38,295 38,295
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,462 58,462
15.4 CIELO RASO DURACUSTIC M2 ### 71,531 71,531
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,470 53,470
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 98,766 98,766
15.7 CORNISAS YESO ML ### 50,941 50,941
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 108,970 108,970
15.9 MALLA CON VENA M2 ### 14,320 14,320

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16.2 MENOR DE 5 KM) M3 ### 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 189,006 171,430
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 62,005 93,982
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 200,303 182,727
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 178,161 160,585
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 183,333 172,506
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 196,737 179,161
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
17 APARATOS SANITARIOS
p
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### i 315,430 315,430
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### o 926,589 926,589
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 502,761 502,761
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 147,204 147,204
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 205,131 205,131
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 190,632 190,632
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 417,524 417,524
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,065,310 1,065,310
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 303,783 303,783
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 215,916 215,916
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 86,905 86,905
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA) UN ### 260,821 260,821

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE


17.13 ACCESORIOS Y GRIFERÍA)
UN ### 383,375 383,375

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,816 8,816
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,255 3,255
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,810 11,810
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,498 44,498
18.5 CARBURO SOBRE PAÑETES M2 ### 6,186 6,186
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 68,401 68,401
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,690 3,690
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,926 2,926
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,737 14,737
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,260 4,260
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,535 15,535
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,022 6,022
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,865 6,865
18.14 ESTUCO M2 ### 7,458 7,458
18.15 ESTUCO (LINEAL) ML ### 4,678 4,678
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,420 16,420
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,202 10,202
18.18 LACA PISOS MADERA M2 ### 24,177 24,177
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,846 2,846
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,777 12,777
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,451 3,451
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,306 13,306
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,492 7,492
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,722 4,722
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,917 22,917
18.26 PINTURA EPÓXICA M2 ### 13,440 13,440
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,320 8,320

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,299,675 6,299,675
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR
19.2 (PAR)
UN ### 11,130,590 11,130,590
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,913,083 2,913,083
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,519,688 9,519,688
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,913,922 8,913,922
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,846 2,846
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ###
p 895,035 895,035
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### i 89,291 89,291
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### o 1,617,686 1,618,278
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 692,088 705,516

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,531 30,531
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 45,354 45,354
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 56,233 56,233
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,369 18,369
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,255 22,255
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,330 30,330
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,099 27,099
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,584 28,584
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,743 35,743
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,420 18,420
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,119 24,119
20.12 VÁLVULA DE BOLA GAS 1" UN ### 37,046 37,046
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 283,184 283,184
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 325,887 325,887
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 339,942 339,942
20.16 ACOMETIDA GAS 1/2" ML ### 315,833 315,833

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 230,697 230,697
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 35,283 35,283
21.3 SIRENA DE 110 V UN ### 107,949 107,949
21.4 CÁMARA CCTV UN ### 276,089 276,089
21.5 PARLANTE-CIELO FALSO UN ### 54,507 54,507
21.6 AMPLIFICADOR 100W UN ### 597,506 597,506
21.7 AMPLIFICADOR 300W UN ### 1,477,217 1,477,217
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,704 47,704
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 230,498 230,498
21.10 TOMA PARA MICRÓFONO UN ### 46,253 46,253
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,930 3,930
21.12 SPLITERS UN ### 6,571 6,571
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,727 19,727
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,790 25,790
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,469 33,469
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 127,899 127,899
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 33,379 33,379
21.18 BANDEJA PORTACABLES PARA RACK UN ### 108,931 108,931
21.19 RACK 2' X 24" UN ### 193,354 193,354
21.20 RACK 3' X 24" UN ### 302,137 302,137
21.21 RACK 5' X 24" UN ### 376,094 376,094
21.22 RACK 7' X 24" UN ### 410,520 410,520
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 603,609 603,609
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 356,276 356,276
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 108,429 108,429
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,404 14,404
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,414 29,414
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,245 5,245
21.29 CANALETA METÁLICA 4X6 CMS ML ### 37,054 37,054
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,696 38,696
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
21.31 CANALETA METÁLICA 6X10 CMS ML ###
p 39,516 39,516
21.32 CANALETA PLÁSTICA 13X7 MM ML ### i 25,790 25,790
21.33 CANALETA PLÁSTICA 20X12 MM ML ### o 28,489 28,489
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,622 29,622
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 49,556 49,556
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 639,504 639,504
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 329,191 329,191
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 93,234 93,234
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,929 1,929
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,894 8,894
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,217 13,217
21.42 CABLE TELEFÓNICO 40 PARES ML ### 22,022 22,022
21.43 CABLE TELEVISIÓN RG6 ML ### 4,098 4,098
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,704 23,704
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,367 34,367
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,410 20,410
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 16,115 16,115
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 643,662 643,662
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
URBANISMO p
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 28,262 28,262
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 94,276 94,276
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 529,922 529,922
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,130,983 1,130,983
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 129,807 129,807
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 789,548 789,548
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,698,520 1,698,520
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,773 13,773
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,936 16,936
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,209 21,209
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 23,192 23,192
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,759 27,759
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,759 27,759
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 110,868 110,868
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 128,448 128,448
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 397,376 397,376
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 149,177 149,177
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 245,919 245,919
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,087,533 1,087,533
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,252,911 1,252,911
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,865 14,865
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,137 13,137
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 32,038 32,038
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 127,593 127,593
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 189,721 189,721
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 31,142 31,142
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 107,059 107,059
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 158,366 158,366
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 31,415 31,415
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 64,705 64,705
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 260,018 260,018
1.32 UNIÓN REPARACION PVC 4" UN ### 75,445 75,445
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 302,431 302,431
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 182,014 182,014
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 516,145 516,145
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,380,109 1,380,109
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,039,159 2,039,159

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,359 11,359
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,999 25,999
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 48,269 82,185
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 183,714 166,138
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 183,714 166,138
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 119,379 137,831
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 102,074 92,928
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 67,801 109,091

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 118,505 118,505
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ###
p 1,234,052 1,234,052
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### i 154,817 154,817
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### o 1,429,311 1,429,311
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 996,339 996,339
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,307 63,307
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 117,640 117,640
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 277,615 277,615
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 277,609 277,609
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 445,615 445,615
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 117,690 117,690
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 117,690 117,690
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 277,615 277,615
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 277,615 277,615
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 445,615 445,615
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 447,941 447,941
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 726,867 726,867
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,166,464 1,166,464
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 72,191 72,191
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 374,960 374,960
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 420,102 420,102
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,162,115 1,162,115
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 67,822 68,247
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 339,987 339,987
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 51,787 51,787
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 73,176 73,176
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 105,530 105,530
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 161,955 161,955
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 260,151 260,151
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 377,642 377,642
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 477,819 477,819
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 628,237 628,237
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 863,887 863,887

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 669,498 701,725
4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 658,258 678,490

4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 722,605 744,090
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 792,619 832,903
4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 932,936 961,425

4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 829,762 859,304
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,030,174 1,045,320
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,472,730 1,517,619
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,986,488 2,073,563
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,613,477 2,758,221
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,898,201 1,898,201
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,008,735 4,008,735
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y
4.13 DEMOLICIÓN)
UN ### 144,169 144,995

5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ###
p 74,552 76,775
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### i 88,488 90,711
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### o 53,744 59,795
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 58,332 63,971
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 58,789 64,365
5.6 BORDE SEPARADOR VERDE A-170 ML ### 261,084 261,910
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,838 19,564
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 38,549 42,813
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 86,148 86,589
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 568,280 579,355
5.11 LOSETA PREFABRICADA A-40 M2 ### 63,354 65,244
5.12 LOSETA PREFABRICADA A-60 M2 ### 92,187 94,077
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 32,948 35,204
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 52,095 56,661
5.15 SARDINEL PREFABRICADO A-10 ML ### 105,541 103,993
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 61,560 62,703

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 207,769 210,455
6.2 BANCA EN CONCRETO M-30 UN ### 684,483 688,243
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 221,802 222,373
6.4 BOLARDO M-60 CONCRETO UN ### 165,304 168,526
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 167,283 170,506
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 196,193 199,619
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 60,153 61,855
6.8 BORDILLO PREFABRICADO A-80 ML ### 68,933 70,838
6.9 CANECA M-120 UN ### 321,193 321,619
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 846,951 848,562
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,473,056 3,474,131
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,572,730 3,573,805
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 499,086 500,228
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 658,774 663,341
6.15 BANCA EN MADERA M-50 UN ### 550,535 550,535
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 255,222 256,833
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 591,365 592,429
6.18 POSTE HISTÓRICO M-131 UN ### 6,595,442 6,603,499

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,149 4,149
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,730 44,730
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 322,799 323,212
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 506,968 509,252
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 241,814 242,226
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 256,768 257,180
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 268,093 268,505
7.8 TACHAS REFLECTIVAS UN ### 13,955 13,955
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,898 14,898

7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 121,210 121,210
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS p 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM) M3 ### 157,537 157,537

1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 55,330 55,330

1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.4 200.2 DISTANCIA DE 5KM) HA ### 968,634 968,634

1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y


1.6 *** DERRUMBES
M3-KM### 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,090 36,090
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.9 600.1 KM) M3 ### 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.10 600.2 KM) M3 ### 66,526 66,526

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR
2.11 600.3 DE 5 KM)
M3 ### 81,693 81,693

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 600.4 MENOR DE 5 KM) M3 ### 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 600.4 P DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.14 600.5 DISTANCIA MENOR DE 5 KM)
M3 ### 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A
2.15 600.5 P UNA DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 183,333 172,506
3.3 330.1 BASE GRANULAR M3 ### 196,737 179,161
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON
3.4 365.1 CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,306 3,306
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,151 1,151
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 220,527 230,292
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 65,870 68,823
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 669,332 652,432
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 683,148 666,248
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 721,954 705,054
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 819,786 694,726
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### p 467,870 456,193
i
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### o 348,410 330,834
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 333,863 323,036
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 39,565 39,565

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 175,419 175,419
3.15 311.1 AFIRMADO M3 ### 178,161 160,585
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,228 11,875
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,441 4,764
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.18 500.1 UNIÓN
M3 ### 618,463 672,085

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.19 500.1 UNIÓN
M3 ### 649,616 705,640

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.20 500.1 UNIÓN M3 ### 670,554 728,344

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E


3.21 *** INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,369 7,369
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 156,581 143,072

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 900,648 961,474
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 768,568 828,385
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 815,389 877,575
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 545,121 598,754
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 644,263 700,020
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 540,720 594,970
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 639,688 696,085
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 706,291 760,540
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 558,957 615,355
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 750,646 807,043
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,351 12,351
4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG ### 15,798 15,798
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,856 1,856
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4.14 621.1 REFUERZO Y ANILLOS)
ML ### 2,762,916 2,762,916

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN
4.15 621.1 P CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
ML ### 4,205,076 4,309,120
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,732,368 1,786,080
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3)### 89,948 89,948
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 367,192 373,637
4.19 632 P BARANDA METÁLICA ML ### 437,954 437,954
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,500 17,500
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 516,338 564,876
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 160,576 176,355
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 180,349 164,125
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 345,233 402,895
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 371,047 400,389
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 379,718 409,060
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 387,358 417,020
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 396,029 425,691
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 490,773 548,974
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 587,992 648,499
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
4.31 681.1 GAVIÓN M3 ###
p 245,462 232,567
4.32 681.1 GAVIÓN MALLA PVC M3 ### i 249,731 236,836
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### o 41,296 44,868
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 15,506 17,292
4.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 ### 10,456 10,456
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,862 14,862

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,966 19,966

4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 ### 23,913 23,913

4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 ### 30,698 30,698
4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,504 7,504
4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,540 8,540

4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,873 8,873

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,344 6,344

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,516 9,516

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,773 7,773

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,516 9,516

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 18,211 18,211

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE


4.48 661.1 EMBOQUILLADA
ML ### 648,359 649,334
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 360,991 373,235
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 906,837 906,837
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 245,326 228,426
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,561 4,561
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 88,208 88,208
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 134,366 134,366
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 495,452 555,958
4.56 682.1 P COLCHONETA RENO M3 ### 262,186 249,291
4.57 *** TRINCHO EN MADERA M2 ### 69,861 69,861

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,149 4,149
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,730 44,730
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 86,063 86,063
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 71,632 71,632
5.5 730.1 DEFENSA METÁLICA ML ### 150,059 152,800
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,955 13,955

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 862 862
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE
6.2 801.6 DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
UN ### 139,847 139,847

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES


6.3 801.7 A UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: MEDINA u
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y nTRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Medina Paratebueno
i
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ###
p 473,470 473,470
M2 ### i
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5
6.6 801.4 KM) 1,804 1,804
o
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,456 15,456
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,996 24,996
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,497 9,497

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL
ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
p CONSTRUCCIÓN
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,050,499 2,068,442 2,072,928 2,071,133 2,069,339 2,081,002 2,088,179 2,070,236 2,062,161 2,078,311
1.2 CAMPAMENTO 9 M2 UN ### 1,199,351 1,208,322 1,210,565 1,209,668 1,208,771 1,214,602 1,218,191 1,209,219 1,205,182 1,213,257
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,707 14,707 14,707 14,707 14,707 14,707 14,707 14,707 14,707 14,707
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,484 16,484 16,484 16,484 16,484 16,484 16,484 16,484 16,484 16,484
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,079 19,079 19,079 19,079 19,079 19,079 19,079 19,079 19,079 19,079
1.6 CERCA EN TABLA H=2.30 M ML ### 67,358 67,358 67,358 67,358 67,358 67,358 67,358 67,358 67,358 67,358
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 47,256 47,449 47,498 47,478 47,459 47,585 47,662 47,469 47,382 47,556
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,941 22,135 22,183 22,164 22,144 22,270 22,347 22,154 22,067 22,241
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 922,626 924,362 924,746 924,751 926,050 927,607 928,381 926,346 923,884 926,421
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 10,600 10,600 10,600 10,600 10,600 10,600 10,600 10,600 10,600 10,600
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,853 3,853 3,853 3,853 3,853 3,853 3,853 3,853 3,853 3,853
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,747,497 2,747,497 2,747,497 2,747,497 2,747,497 2,747,497 2,747,497 2,747,497 2,747,497 2,747,497
1.44 RED TELEFÓNICA PROVISIONAL UN ### 255,264 255,264 255,264 255,264 255,264 255,264 255,264 255,264 255,264 255,264
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 88,339 84,824 83,067 86,582 112,946 118,219 118,219 116,461 88,339 102,400
2.2 BASE ARENA CEMENTO 1:20 M3 ### 177,414 191,255 194,717 193,332 191,947 200,946 206,481 192,640 186,411 198,869
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ###
p 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### i 22,726 22,726 22,726 22,726 22,726 22,726 22,726 22,726 22,726 22,726
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### o 647,904 666,939 671,698 669,793 667,890 680,263 687,877 668,842 660,276 677,408
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 649,826 669,490 674,407 672,439 670,472 683,254 691,120 671,457 662,607 680,305
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 605,763 624,175 628,779 626,937 625,095 637,064 644,429 626,017 617,731 634,302
2.9 PILOTE DE MADERA D=20 CM ML ### 50,977 50,977 50,977 50,977 50,977 50,977 50,977 50,977 50,977 50,977
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM)
ML ### 157,407 157,407 157,407 157,407 157,407 157,407 157,407 157,407 157,407 157,407

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.11 DISTANCIA MENOR DE 5 KM)
ML ### 196,026 196,026 196,026 196,026 196,026 196,026 196,026 196,026 196,026 196,026

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.12 DISTANCIA MENOR DE 5 KM)
ML ### 242,728 242,728 242,728 242,728 242,728 242,728 242,728 242,728 242,728 242,728

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.13 DISTANCIA MENOR DE 5 KM) ML ### 305,595 305,595 305,595 305,595 305,595 305,595 305,595 305,595 305,595 305,595
2.14 PILOTE HINCADO 25X25 ML ### 106,743 108,077 108,411 108,278 108,144 109,011 109,545 108,211 107,610 108,811
2.15 PILOTE HINCADO 30X30 ML ### 131,411 133,345 133,828 133,635 133,441 134,698 135,471 133,538 132,668 134,408
2.16 DADOS EN CONCRETO 3500PSI M3 ### 590,765 609,177 613,781 611,938 610,097 622,065 629,431 611,019 602,732 619,304
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 94,295 94,295 94,295 94,295 94,295 94,295 94,295 94,295 94,295 94,295

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 39,433 39,519 39,540 39,532 39,523 39,579 39,613 39,527 39,489 39,566
3.2 SIFÓN EN PVC 6" UN ### 202,307 202,393 202,414 202,406 202,397 202,453 202,488 202,402 202,363 202,440
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 460,233 465,853 466,845 467,769 479,430 486,634 489,543 481,446 464,959 478,111
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 231,683 233,860 234,369 234,276 235,090 236,804 237,730 235,345 233,188 235,830
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 263,165 266,788 267,638 267,473 268,731 271,556 273,092 269,142 265,662 269,995
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 344,464 350,774 352,296 351,862 352,851 357,423 360,034 353,397 348,707 355,459
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 109,635 109,615 109,605 109,625 109,775 109,804 109,804 109,795 109,635 109,715
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,309,783 1,309,584 1,309,484 1,309,683 1,311,176 1,311,474 1,311,474 1,311,375 1,309,783 1,310,579
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 117,506 118,456 118,693 118,598 118,503 119,121 119,501 118,551 118,123 118,978
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 73,963 74,464 74,589 74,539 74,489 74,815 75,015 74,514 74,288 74,739
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,689 29,032 29,118 29,084 29,050 29,273 29,410 29,067 28,912 29,221
3.12 TUBERÍA DRENAJE PVC 160 ML ### 46,052 46,395 46,481 46,447 46,412 46,636 46,773 46,430 46,275 46,584
3.13 TUBERÍA DRENAJE PVC 200 ML ### 60,331 60,812 60,932 60,884 60,836 61,148 61,341 60,860 60,643 61,076
3.14 TUBERÍA DRENAJE PVC 250 ML ### 82,434 82,984 83,121 83,066 83,011 83,369 83,589 83,039 82,791 83,286
3.15 TUBERÍA DRENAJE PVC 315 ML ### 113,908 114,389 114,509 114,461 114,413 114,725 114,918 114,437 114,220 114,653
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 976,964 982,461 983,836 983,286 982,736 986,309 988,508 983,011 980,537 985,485
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
3.17 FILTRANTE)
UN ### 1,378,373 1,389,368 1,392,117 1,391,017 1,389,918 1,397,064 1,401,463 1,390,468 1,385,520 1,395,416
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3.18 FILTRANTE)
UN ### 1,791,904 1,813,895 1,819,392 1,817,192 1,814,994 1,829,287 1,838,084 1,816,093 1,806,197 1,825,989

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 43,403 43,403 43,403 43,403 43,403 43,403 43,403 43,403 43,403 43,403
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 57,160 57,160 57,160 57,160 57,160 57,160 57,160 57,160 57,160 57,160
4.3 COLUMNAS 3500 PSI M3 ### 819,884 838,296 842,900 841,058 839,216 851,185 858,550 840,138 831,851 848,423
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 248,587 260,227 263,869 261,492 261,206 278,112 270,064 260,932 255,881 271,832
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI
M2 ### 99,709 101,497 101,944 101,765 101,586 102,748 103,463 101,676 100,871 102,480

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE


4.6 REFUERZO, CONCRETO DE 3500 PSI M2 ### 117,436 119,581 120,118 119,903 119,689 121,083 121,941 119,796 118,831 120,761

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 131,765 134,625 135,340 135,054 134,768 136,627 137,771 134,911 133,624 136,198

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 138,990 142,029 142,789 142,485 142,181 144,157 145,372 142,333 140,966 143,701
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### p 158,867 162,621 163,560 163,184 162,809 165,249 166,751 162,997 161,307 164,686
i
o
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 176,542 180,832 181,905 181,476 181,047 183,836 185,552 181,262 179,331 183,192

4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 195,885 200,712 201,919 201,436 200,953 204,091 206,021 201,195 199,023 203,367
4.12 ENTREPISO VIGUETA PLACA M2 ### 102,239 102,548 102,625 102,594 102,563 102,764 102,887 102,579 102,440 102,717
4.13 ESCALERA MACIZA 3500 PSI M3 ### 972,310 990,723 995,327 993,484 991,642 1,003,611 1,010,977 992,564 984,278 1,000,850
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 97,527 97,775 97,837 97,812 97,788 97,949 98,048 97,800 97,688 97,911
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 80,300 82,141 82,601 82,417 82,233 83,430 84,166 82,325 81,496 83,154
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 90,133 92,385 92,949 92,723 92,498 93,962 94,863 92,611 91,597 93,624
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 104,785 107,609 108,316 108,033 107,750 109,586 110,716 107,892 106,621 109,163
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 716,532 734,944 739,548 737,705 735,864 747,832 755,198 736,785 728,499 745,071

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 51,088 51,652 51,793 51,737 51,681 52,047 52,273 51,709 51,455 51,963

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 283,448 291,670 293,727 292,904 292,081 297,426 300,716 292,493 288,792 296,193
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,294 4,294 4,294 4,294 4,294 4,294 4,294 4,294 4,294 4,294
4.22 ACERO FIGURADO 60000 PSI KG ### 4,503 4,503 4,503 4,503 4,503 4,503 4,503 4,503 4,503 4,503
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,382 6,382 6,382 6,382 6,382 6,382 6,382 6,382 6,382 6,382
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 871,421 889,833 894,437 892,594 890,753 902,721 910,087 891,675 883,388 899,960
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 789,261 809,414 814,454 812,437 810,421 823,522 831,584 811,430 802,360 820,499
4.26 VIGA AÉREA 3500 PSI M3 ### 862,186 880,599 885,203 883,360 881,518 893,487 900,853 882,440 874,154 890,726
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 840,883 859,295 863,899 862,056 860,215 872,183 879,549 861,137 852,850 869,422
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,063,583 1,081,995 1,086,600 1,084,757 1,082,915 1,094,884 1,102,249 1,083,837 1,075,551 1,092,122
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 315,293 335,828 340,961 338,908 336,854 350,202 358,416 337,881 328,639 347,122

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,611 31,074 31,189 31,143 31,097 31,397 31,582 31,120 30,912 31,328
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 52,165 52,627 52,743 52,697 52,650 52,951 53,136 52,674 52,466 52,882
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,439 36,525 36,546 36,538 36,529 36,585 36,619 36,534 36,495 36,572
5.4 ARCOS EN LADRILLO PRENSADO ML ### 170,920 171,092 171,135 171,118 171,101 171,213 171,281 171,109 171,032 171,187
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,594 46,158 46,299 46,243 46,186 46,553 46,779 46,215 45,961 46,468
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,055 28,302 28,364 28,339 28,315 28,476 28,575 28,327 28,216 28,439
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 101,410 101,754 101,840 101,805 101,771 101,995 102,132 101,788 101,634 101,943
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 92,354 94,236 94,706 94,518 94,330 95,553 96,305 94,424 93,577 95,270
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 94,718 94,718 94,718 94,718 94,718 94,718 94,718 94,718 94,718 94,718
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,758 55,758 55,758 55,758 55,758 55,758 55,758 55,758 55,758 55,758
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 91,272 91,272 91,272 91,272 91,272 91,272 91,272 91,272 91,272 91,272
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,035 54,035 54,035 54,035 54,035 54,035 54,035 54,035 54,035 54,035
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 105,467 105,467 105,467 105,467 105,467 105,467 105,467 105,467 105,467 105,467
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,533 62,533 62,533 62,533 62,533 62,533 62,533 62,533 62,533 62,533
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 117,157 117,157 117,157 117,157 117,157 117,157 117,157 117,157 117,157 117,157
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,378 68,378 68,378 68,378 68,378 68,378 68,378 68,378 68,378 68,378
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 41,931 42,104 42,147 42,129 42,112 42,225 42,294 42,121 42,043 42,199
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,538 25,624 25,646 25,637 25,629 25,685 25,719 25,633 25,594 25,672
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 54,572 54,688 54,716 54,705 54,693 54,768 54,814 54,699 54,647 54,751
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,988 33,046 33,060 33,054 33,049 33,086 33,109 33,052 33,026 33,078
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 61,428 61,543 61,572 61,560 61,549 61,624 61,670 61,554 61,503 61,606
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,130 37,187 37,202 37,196 37,190 37,228 37,251 37,193 37,167 37,219
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 101,450 102,026 102,170 102,112 102,055 102,429 102,660 102,084 101,824 102,343
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 60,349 60,637 60,709 60,680 60,651 60,838 60,954 60,666 60,536 60,795
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 38,546 38,661 38,690 38,678 38,667 38,742 38,788 38,673 38,621 38,724
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,493 23,550 23,565 23,559 23,553 23,591 23,614 23,556 23,530 23,582
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 76,486 76,717 76,774 76,751 76,728 76,878 76,970 76,740 76,636 76,843
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ###
p 46,364 46,479 46,508 46,497 46,485 46,560 46,606 46,491 46,439 46,543
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### i 90,502 90,750 90,812 90,787 90,762 90,923 91,023 90,775 90,663 90,886
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### o 55,150 55,274 55,305 55,292 55,280 55,361 55,410 55,286 55,230 55,342
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 186,044 186,850 187,052 186,971 186,891 187,415 187,737 186,931 186,568 187,294
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 112,520 112,923 113,024 112,983 112,943 113,205 113,366 112,963 112,782 113,145
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 92,593 93,109 93,239 93,187 93,135 93,471 93,678 93,161 92,929 93,394
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,195 56,454 56,518 56,492 56,466 56,634 56,738 56,479 56,363 56,596
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 48,106 48,364 48,428 48,402 48,377 48,544 48,648 48,390 48,274 48,506
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,457 29,586 29,619 29,606 29,593 29,677 29,728 29,599 29,541 29,657
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 34,911 35,026 35,055 35,044 35,032 35,107 35,153 35,038 34,986 35,090
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,384 21,441 21,456 21,450 21,444 21,482 21,505 21,447 21,421 21,473
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 52,371 52,601 52,659 52,636 52,612 52,762 52,854 52,624 52,520 52,728
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,313 32,428 32,457 32,446 32,434 32,509 32,555 32,440 32,388 32,492
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 101,048 101,394 101,480 101,446 101,411 101,636 101,774 101,428 101,273 101,584
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 61,917 62,090 62,133 62,116 62,099 62,211 62,280 62,107 62,029 62,185
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 73,905 74,135 74,193 74,170 74,147 74,297 74,389 74,158 74,055 74,262
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 44,862 44,978 45,006 44,995 44,983 45,058 45,104 44,989 44,937 45,041
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 154,594 155,401 155,602 155,522 155,441 155,965 156,288 155,482 155,119 155,844
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 94,643 95,046 95,147 95,107 95,066 95,328 95,490 95,087 94,905 95,268
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 32,851 32,937 32,959 32,950 32,942 32,998 33,032 32,946 32,907 32,985
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 37,711 38,082 38,175 38,138 38,101 38,343 38,491 38,120 37,952 38,287
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 63,739 64,235 64,358 64,309 64,259 64,581 64,780 64,284 64,061 64,507
5.50 LAVADA DE FACHADA M2 ### 5,539 5,539 5,539 5,539 5,539 5,539 5,539 5,539 5,539 5,539
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 52,543 53,005 53,121 53,074 53,028 53,329 53,514 53,051 52,843 53,259
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,146 11,146 11,146 11,146 11,146 11,146 11,146 11,146 11,146 11,146
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,625 14,625 14,625 14,625 14,625 14,625 14,625 14,625 14,625 14,625
5.54 ANCLAJE 1/2" L=50CM UN ### 19,079 19,079 19,079 19,079 19,079 19,079 19,079 19,079 19,079 19,079
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,534 26,534 26,534 26,534 26,534 26,534 26,534 26,534 26,534 26,534
5.56 ANCLAJE 3/4" L=70CM UN ### 39,332 39,332 39,332 39,332 39,332 39,332 39,332 39,332 39,332 39,332
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,013 5,151 5,186 5,172 5,158 5,248 5,303 5,165 5,103 5,227

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,992 16,992 16,992 16,992 16,992 16,992 16,992 16,992 16,992 16,992
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,887 5,973 5,994 5,986 5,977 6,033 6,067 5,981 5,943 6,020
6.3 FILOS O DILATACIONES S/MURO ML ### 7,144 7,230 7,251 7,243 7,234 7,290 7,324 7,238 7,200 7,277
6.4 GOTERA EN MORTERO 1:4 ML ### 8,460 8,546 8,568 8,559 8,551 8,607 8,641 8,555 8,516 8,594
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,069 7,069 7,069 7,069 7,069 7,069 7,069 7,069 7,069 7,069
6.6 MALLA BAJO ENTRAMADO M2 ### 14,352 14,352 14,352 14,352 14,352 14,352 14,352 14,352 14,352 14,352
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,453 25,814 25,905 25,868 25,832 26,067 26,212 25,850 25,688 26,013
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,476 15,657 15,702 15,684 15,666 15,783 15,856 15,675 15,594 15,756
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,676 21,918 21,978 21,954 21,930 22,087 22,184 21,942 21,833 22,051
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,259 13,380 13,410 13,398 13,386 13,464 13,513 13,392 13,337 13,446
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,328 21,690 21,780 21,744 21,708 21,943 22,087 21,726 21,563 21,889
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,085 13,266 13,311 13,293 13,275 13,392 13,465 13,284 13,202 13,365
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,676 21,918 21,978 21,954 21,930 22,087 22,184 21,942 21,833 22,051
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,259 13,380 13,410 13,398 13,386 13,464 13,513 13,392 13,337 13,446
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,491 22,749 22,813 22,787 22,761 22,929 23,032 22,774 22,658 22,890
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,665 13,794 13,826 13,813 13,800 13,884 13,936 13,807 13,749 13,865
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,086 18,270 18,317 18,298 18,280 18,400 18,473 18,289 18,206 18,372
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,158 11,250 11,273 11,264 11,255 11,315 11,352 11,260 11,218 11,301
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,821 18,097 18,166 18,138 18,111 18,290 18,400 18,124 18,000 18,248
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,026 11,163 11,198 11,184 11,170 11,260 11,315 11,177 11,115 11,239
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,501 22,743 22,803 22,779 22,755 22,912 23,009 22,767 22,658 22,876
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,650 13,771 13,801 13,789 13,777 13,856 13,904 13,783 13,729 13,838
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ###
p 22,153 22,515 22,605 22,569 22,533 22,768 22,912 22,551 22,388 22,713
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### i 13,476 13,657 13,702 13,684 13,666 13,784 13,856 13,675 13,594 13,756
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### o 18,468 18,744 18,813 18,785 18,757 18,937 19,047 18,771 18,647 18,895
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,330 11,468 11,503 11,489 11,475 11,564 11,620 11,482 11,420 11,544
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 23,096 23,457 23,548 23,512 23,475 23,710 23,855 23,494 23,331 23,656
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,376 14,557 14,602 14,584 14,566 14,683 14,756 14,575 14,494 14,656

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 27,430 27,776 27,862 27,828 27,793 28,018 28,156 27,810 27,655 27,966
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE)
M2 ### 84,878 85,819 86,054 85,960 85,866 86,477 86,854 85,913 85,490 86,336
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 56,884 56,884 56,884 56,884 56,884 56,884 56,884 56,884 56,884 56,884
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,915 22,915 22,915 22,915 22,915 22,915 22,915 22,915 22,915 22,915
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,893 35,893 35,893 35,893 35,893 35,893 35,893 35,893 35,893 35,893
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 82,909 82,909 82,909 82,909 82,909 82,909 82,909 82,909 82,909 82,909
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 65,076 65,076 65,076 65,076 65,076 65,076 65,076 65,076 65,076 65,076
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,148 38,148 38,148 38,148 38,148 38,148 38,148 38,148 38,148 38,148
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 86,855 86,855 86,855 86,855 86,855 86,855 86,855 86,855 86,855 86,855
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 103,574 103,574 103,574 103,574 103,574 103,574 103,574 103,574 103,574 103,574
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 151,880 151,880 151,880 151,880 151,880 151,880 151,880 151,880 151,880 151,880
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 60,533 60,533 60,533 60,533 60,533 60,533 60,533 60,533 60,533 60,533
7.13 CANAL PVC AMAZONAS ML ### 84,399 84,399 84,399 84,399 84,399 84,399 84,399 84,399 84,399 84,399
7.14 CANAL PVC RAINGO ML ### 76,860 76,860 76,860 76,860 76,860 76,860 76,860 76,860 76,860 76,860
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 135,161 135,161 135,161 135,161 135,161 135,161 135,161 135,161 135,161 135,161
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 78,768 78,768 78,768 78,768 78,768 78,768 78,768 78,768 78,768 78,768
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 58,014 58,014 58,014 58,014 58,014 58,014 58,014 58,014 58,014 58,014
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,637 33,637 33,637 33,637 33,637 33,637 33,637 33,637 33,637 33,637
7.19000000000001 TEJA DE BARRO M2 ### 60,926 61,356 61,464 61,421 61,378 61,657 61,829 61,399 61,206 61,593
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 48,343 48,343 48,343 48,343 48,343 48,343 48,343 48,343 48,343 48,343
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 44,358 44,358 44,358 44,358 44,358 44,358 44,358 44,358 44,358 44,358
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 37,855 37,855 37,855 37,855 37,855 37,855 37,855 37,855 37,855 37,855
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 37,027 37,027 37,027 37,027 37,027 37,027 37,027 37,027 37,027 37,027
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,300 37,300 37,300 37,300 37,300 37,300 37,300 37,300 37,300 37,300
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 52,137 52,137 52,137 52,137 52,137 52,137 52,137 52,137 52,137 52,137
7.26 TEJA PLÁSTICA No.6 M2 ### 45,926 45,926 45,926 45,926 45,926 45,926 45,926 45,926 45,926 45,926
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 83,548 83,548 83,548 83,548 83,548 83,548 83,548 83,548 83,548 83,548

7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 153,641 153,641 153,641 153,641 153,641 153,641 153,641 153,641 153,641 153,641

7.29000000000001 TEJA SIN TRASLAPO M2 ### 69,306 69,306 69,306 69,306 69,306 69,306 69,306 69,306 69,306 69,306
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,493 44,493 44,493 44,493 44,493 44,493 44,493 44,493 44,493 44,493
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,695 34,695 34,695 34,695 34,695 34,695 34,695 34,695 34,695 34,695
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM)
M2 ### 59,789 59,789 59,789 59,789 59,789 59,789 59,789 59,789 59,789 59,789
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,968 20,968 20,968 20,968 20,968 20,968 20,968 20,968 20,968 20,968
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,078 25,078 25,078 25,078 25,078 25,078 25,078 25,078 25,078 25,078
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,062 27,062 27,062 27,062 27,062 27,062 27,062 27,062 27,062 27,062
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 34,650 34,650 34,650 34,650 34,650 34,650 34,650 34,650 34,650 34,650
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,055 23,055 23,055 23,055 23,055 23,055 23,055 23,055 23,055 23,055
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,183 54,183 54,183 54,183 54,183 54,183 54,183 54,183 54,183 54,183
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 362,672 362,672 362,672 362,672 362,672 362,672 362,672 362,672 362,672 362,672
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 425,862 425,862 425,862 425,862 425,862 425,862 425,862 425,862 425,862 425,862
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 278,188 278,188 278,188 278,188 278,188 278,188 278,188 278,188 278,188 278,188
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 296,480 296,480 296,480 296,480 296,480 296,480 296,480 296,480 296,480 296,480
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
8 MORTEROS Y CONCRETOS
p
8.1 CONCRETO 4000 PSI M3 ### i 447,768 467,103 471,938 470,003 468,070 480,638 488,372 469,037 460,335 477,738
8.2 CONCRETO 3500 PSI M3 ### o 391,219 409,095 413,565 411,776 409,988 421,608 428,759 410,883 402,838 418,927
8.3 CONCRETO 3000 PSI M3 ### 389,361 407,842 412,462 410,613 408,765 420,778 428,170 409,690 401,373 418,006
8.4 CONCRETO 2500 PSI M3 ### 343,281 362,094 366,798 364,915 363,034 375,263 382,788 363,975 355,509 372,441
8.5 CONCRETO 2000 PSI M3 ### 319,806 339,153 343,991 342,055 340,120 352,696 360,436 341,088 332,381 349,794
8.6 CONCRETO 1500 PSI M3 ### 290,092 310,029 315,013 313,019 311,025 323,984 331,959 312,022 303,050 320,994
8.7 MORTERO SECO 1:10 M3 ### 225,141 237,004 239,971 238,785 237,598 245,311 250,055 238,191 232,852 243,530
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 442,970 454,490 457,371 456,219 455,067 462,556 467,163 455,643 450,458 460,827
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 426,415 443,630 447,935 446,213 444,491 455,681 462,568 445,352 437,605 453,099
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 488,546 504,646 508,672 507,062 505,451 515,917 522,357 506,257 499,011 513,502
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 718,266 734,366 738,392 736,782 735,171 745,637 752,077 735,977 728,731 743,222

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 127,011 127,011 127,011 127,011 127,011 127,011 127,011 127,011 127,011 127,011
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,970 4,056 4,078 4,069 4,060 4,116 4,151 4,065 4,026 4,103
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 142,661 142,661 142,661 142,661 142,661 142,661 142,661 142,661 142,661 142,661
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 174,109 174,109 174,109 174,109 174,109 174,109 174,109 174,109 174,109 174,109
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 250,803 250,803 250,803 250,803 250,803 250,803 250,803 250,803 250,803 250,803
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 279,009 279,009 279,009 279,009 279,009 279,009 279,009 279,009 279,009 279,009
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 307,251 307,251 307,251 307,251 307,251 307,251 307,251 307,251 307,251 307,251
9.8 HOJA PUERTA FORTEC 0.81 UN ### 203,716 203,716 203,716 203,716 203,716 203,716 203,716 203,716 203,716 203,716
9.9 HOJA PUERTA FORTEC 0.91 UN ### 230,845 230,845 230,845 230,845 230,845 230,845 230,845 230,845 230,845 230,845
9.10 HOJA PUERTA FORTEC 1.50 UN ### 339,360 339,360 339,360 339,360 339,360 339,360 339,360 339,360 339,360 339,360
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 129,111 129,111 129,111 129,111 129,111 129,111 129,111 129,111 129,111 129,111
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 171,161 171,161 171,161 171,161 171,161 171,161 171,161 171,161 171,161 171,161
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 190,151 190,151 190,151 190,151 190,151 190,151 190,151 190,151 190,151 190,151
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 483,142 483,142 483,142 483,142 483,142 483,142 483,142 483,142 483,142 483,142
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 43,580 43,580 43,580 43,580 43,580 43,580 43,580 43,580 43,580 43,580
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,457 27,457 27,457 27,457 27,457 27,457 27,457 27,457 27,457 27,457
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 103,082 103,082 103,082 103,082 103,082 103,082 103,082 103,082 103,082 103,082
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 123,799 123,799 123,799 123,799 123,799 123,799 123,799 123,799 123,799 123,799
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 96,263 96,263 96,263 96,263 96,263 96,263 96,263 96,263 96,263 96,263
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,123 30,123 30,123 30,123 30,123 30,123 30,123 30,123 30,123 30,123
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,123 30,123 30,123 30,123 30,123 30,123 30,123 30,123 30,123 30,123
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,577 28,577 28,577 28,577 28,577 28,577 28,577 28,577 28,577 28,577
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 43,817 43,817 43,817 43,817 43,817 43,817 43,817 43,817 43,817 43,817
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 54,092 54,092 54,092 54,092 54,092 54,092 54,092 54,092 54,092 54,092
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 65,053 65,053 65,053 65,053 65,053 65,053 65,053 65,053 65,053 65,053
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 78,067 78,067 78,067 78,067 78,067 78,067 78,067 78,067 78,067 78,067
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 365,598 365,598 365,598 365,598 365,598 365,598 365,598 365,598 365,598 365,598
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 255,998 255,998 255,998 255,998 255,998 255,998 255,998 255,998 255,998 255,998
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 34,912 34,912 34,912 34,912 34,912 34,912 34,912 34,912 34,912 34,912
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 44,502 44,502 44,502 44,502 44,502 44,502 44,502 44,502 44,502 44,502
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 54,092 54,092 54,092 54,092 54,092 54,092 54,092 54,092 54,092 54,092
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 67,793 67,793 67,793 67,793 67,793 67,793 67,793 67,793 67,793 67,793

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 78,605 78,605 78,605 78,605 78,605 78,605 78,605 78,605 78,605 78,605
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 216,372 216,372 216,372 216,372 216,372 216,372 216,372 216,372 216,372 216,372
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO)
ML ### 83,573 83,573 83,573 83,573 83,573 83,573 83,573 83,573 83,573 83,573
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 150,793 150,793 150,793 150,793 150,793 150,793 150,793 150,793 150,793 150,793
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 141,342 141,342 141,342 141,342 141,342 141,342 141,342 141,342 141,342 141,342
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ###
p 92,823 92,823 92,823 92,823 92,823 92,823 92,823 92,823 92,823 92,823
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### i 218,102 218,102 218,102 218,102 218,102 218,102 218,102 218,102 218,102 218,102
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### o 113,992 113,992 113,992 113,992 113,992 113,992 113,992 113,992 113,992 113,992
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,862 6,862 6,862 6,862 6,862 6,862 6,862 6,862 6,862 6,862
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 104,238 104,238 104,238 104,238 104,238 104,238 104,238 104,238 104,238 104,238

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H:


10,10(1) 2.00 MTS
M2 ### 124,648 124,648 124,648 124,648 124,648 124,648 124,648 124,648 124,648 124,648
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,879 42,879 42,879 42,879 42,879 42,879 42,879 42,879 42,879 42,879

10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 550,774 550,774 550,774 550,774 550,774 550,774 550,774 550,774 550,774 550,774

10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 198,844 198,844 198,844 198,844 198,844 198,844 198,844 198,844 198,844 198,844
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 224,558 224,558 224,558 224,558 224,558 224,558 224,558 224,558 224,558 224,558
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
10.15 PUERTAS Y ACCESORIOS)
M2 ### 503,058 503,058 503,058 503,058 503,058 503,058 503,058 503,058 503,058 503,058

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 134,059 134,059 134,059 134,059 134,059 134,059 134,059 134,059 134,059 134,059
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 401,245 401,245 401,245 401,245 401,245 401,245 401,245 401,245 401,245 401,245
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,258 6,258 6,258 6,258 6,258 6,258 6,258 6,258 6,258 6,258
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 283,116 283,116 283,116 283,116 283,116 283,116 283,116 283,116 283,116 283,116
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 127,339 127,339 127,339 127,339 127,339 127,339 127,339 127,339 127,339 127,339
10.21 REJILLA PISO 0.30 M M2 ### 88,992 88,992 88,992 88,992 88,992 88,992 88,992 88,992 88,992 88,992
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 92,075 92,075 92,075 92,075 92,075 92,075 92,075 92,075 92,075 92,075
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,991 10,991 10,991 10,991 10,991 10,991 10,991 10,991 10,991 10,991
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
KG ### 12,167 12,167 12,167 12,167 12,167 12,167 12,167 12,167 12,167 12,167
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,725 9,725 9,725 9,725 9,725 9,725 9,725 9,725 9,725 9,725
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 230,641 230,641 230,641 230,641 230,641 230,641 230,641 230,641 230,641 230,641
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 276,929 276,929 276,929 276,929 276,929 276,929 276,929 276,929 276,929 276,929
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,915 22,915 22,915 22,915 22,915 22,915 22,915 22,915 22,915 22,915
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,893 35,893 35,893 35,893 35,893 35,893 35,893 35,893 35,893 35,893
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,579 34,579 34,579 34,579 34,579 34,579 34,579 34,579 34,579 34,579
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,195 44,195 44,195 44,195 44,195 44,195 44,195 44,195 44,195 44,195
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 90,736 90,736 90,736 90,736 90,736 90,736 90,736 90,736 90,736 90,736
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 232,027 232,027 232,027 232,027 232,027 232,027 232,027 232,027 232,027 232,027
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,896 46,896 46,896 46,896 46,896 46,896 46,896 46,896 46,896 46,896
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 36,621 36,621 36,621 36,621 36,621 36,621 36,621 36,621 36,621 36,621
11.13 NIPLE PASAMURO 2" UN ### 70,148 70,148 70,148 70,148 70,148 70,148 70,148 70,148 70,148 70,148
11.14 NIPLE PASAMURO 4" UN ### 104,668 104,668 104,668 104,668 104,668 104,668 104,668 104,668 104,668 104,668
11.15 PUNTO AGUA CALIENTE CPVC UN ### 87,847 87,847 87,847 87,847 87,847 87,847 87,847 87,847 87,847 87,847
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ###
p 64,731 64,731 64,731 64,731 64,731 64,731 64,731 64,731 64,731 64,731
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### i 68,700 68,700 68,700 68,700 68,700 68,700 68,700 68,700 68,700 68,700
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### o 86,781 86,781 86,781 86,781 86,781 86,781 86,781 86,781 86,781 86,781
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 69,524 69,524 69,524 69,524 69,524 69,524 69,524 69,524 69,524 69,524
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 86,471 86,471 86,471 86,471 86,471 86,471 86,471 86,471 86,471 86,471
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 92,343 92,343 92,343 92,343 92,343 92,343 92,343 92,343 92,343 92,343
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 75,956 75,956 75,956 75,956 75,956 75,956 75,956 75,956 75,956 75,956
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,929 12,929 12,929 12,929 12,929 12,929 12,929 12,929 12,929 12,929
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,102 18,102 18,102 18,102 18,102 18,102 18,102 18,102 18,102 18,102
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,655 23,655 23,655 23,655 23,655 23,655 23,655 23,655 23,655 23,655
11.26 RED SUMINISTRO PVC 1" ML ### 14,674 14,674 14,674 14,674 14,674 14,674 14,674 14,674 14,674 14,674
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,809 8,809 8,809 8,809 8,809 8,809 8,809 8,809 8,809 8,809
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 52,439 52,439 52,439 52,439 52,439 52,439 52,439 52,439 52,439 52,439
11.29 RED SUMINISTRO PVC 2" ML ### 33,628 33,628 33,628 33,628 33,628 33,628 33,628 33,628 33,628 33,628
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,001 11,001 11,001 11,001 11,001 11,001 11,001 11,001 11,001 11,001
11.31 RED SANITARIA PVC-S 2" ML ### 26,070 26,070 26,070 26,070 26,070 26,070 26,070 26,070 26,070 26,070
11.32 RED SANITARIA PVC-S 3" ML ### 36,092 36,092 36,092 36,092 36,092 36,092 36,092 36,092 36,092 36,092
11.33 RED SANITARIA PVC-S 4" ML ### 48,925 48,925 48,925 48,925 48,925 48,925 48,925 48,925 48,925 48,925
11.34 RED SANITARIA PVC-S 6" ML ### 90,915 90,915 90,915 90,915 90,915 90,915 90,915 90,915 90,915 90,915
11.35 REGISTRO 1" UN ### 110,899 110,899 110,899 110,899 110,899 110,899 110,899 110,899 110,899 110,899
11.36 REGISTRO 1/2" UN ### 61,908 61,908 61,908 61,908 61,908 61,908 61,908 61,908 61,908 61,908
11.37 REGISTRO 3/4" UN ### 78,619 78,619 78,619 78,619 78,619 78,619 78,619 78,619 78,619 78,619
11.38 REGISTRO 1 1/2" UN ### 189,301 189,301 189,301 189,301 189,301 189,301 189,301 189,301 189,301 189,301
11.39 REGISTRO 2 1/2" UN ### 389,395 389,395 389,395 389,395 389,395 389,395 389,395 389,395 389,395 389,395
11.40 REGISTRO 2" UN ### 288,091 288,091 288,091 288,091 288,091 288,091 288,091 288,091 288,091 288,091
11.41 REVENTILACIÓN 2" ML ### 18,232 18,232 18,232 18,232 18,232 18,232 18,232 18,232 18,232 18,232
11.42 REVENTILACIÓN 3" ML ### 22,989 22,989 22,989 22,989 22,989 22,989 22,989 22,989 22,989 22,989
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN)
UN ### 178,702 178,702 178,702 178,702 178,702 178,702 178,702 178,702 178,702 178,702
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11.44 ISNTALACIÓN)
UN ### 289,995 289,995 289,995 289,995 289,995 289,995 289,995 289,995 289,995 289,995
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11.45 INSTALACIÓN) UN ### 481,925 481,925 481,925 481,925 481,925 481,925 481,925 481,925 481,925 481,925
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
11.46 SOPORTES) ML ### 41,531 41,531 41,531 41,531 41,531 41,531 41,531 41,531 41,531 41,531
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS
11.47 Y SOPORTES)
ML ### 48,961 48,961 48,961 48,961 48,961 48,961 48,961 48,961 48,961 48,961
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11.48 SOPORTES)
ML ### 63,114 63,114 63,114 63,114 63,114 63,114 63,114 63,114 63,114 63,114
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11.49 SOPORTES)
ML ### 71,367 71,367 71,367 71,367 71,367 71,367 71,367 71,367 71,367 71,367
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11.50 ACCESORIOS Y SOPORTES)
ML ### 91,939 91,939 91,939 91,939 91,939 91,939 91,939 91,939 91,939 91,939

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y


11.51 SOPORTES) ML ### 106,985 106,985 106,985 106,985 106,985 106,985 106,985 106,985 106,985 106,985

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y


11.52 SOPORTES)
ML ### 158,333 158,333 158,333 158,333 158,333 158,333 158,333 158,333 158,333 158,333
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,172 64,172 64,172 64,172 64,172 64,172 64,172 64,172 64,172 64,172
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,428 64,428 64,428 64,428 64,428 64,428 64,428 64,428 64,428 64,428
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,220 41,220 41,220 41,220 41,220 41,220 41,220 41,220 41,220 41,220
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 50,661 50,661 50,661 50,661 50,661 50,661 50,661 50,661 50,661 50,661

11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,267 4,267 4,267 4,267 4,267 4,267 4,267 4,267 4,267 4,267

11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,711 6,711 6,711 6,711 6,711 6,711 6,711 6,711 6,711 6,711

11.59 GABINETE TIPO III UN ### 1,039,747 1,039,747 1,039,747 1,039,747 1,039,747 1,039,747 1,039,747 1,039,747 1,039,747 1,039,747
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
11.60 GABINETE TIPO I UN ###
p 795,859 795,859 795,859 795,859 795,859 795,859 795,859 795,859 795,859 795,859
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### i 2,661,130 2,661,130 2,661,130 2,661,130 2,661,130 2,661,130 2,661,130 2,661,130 2,661,130 2,661,130
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### o 2,219,928 2,219,928 2,219,928 2,219,928 2,219,928 2,219,928 2,219,928 2,219,928 2,219,928 2,219,928
11.63 VÁLVULA MARIPOSA 3" UN ### 649,474 649,474 649,474 649,474 649,474 649,474 649,474 649,474 649,474 649,474
11.64 VÁLVULA MARIPOSA 4" UN ### 838,290 838,290 838,290 838,290 838,290 838,290 838,290 838,290 838,290 838,290
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 320,539 320,539 320,539 320,539 320,539 320,539 320,539 320,539 320,539 320,539

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 373,651 373,651 373,651 373,651 373,651 373,651 373,651 373,651 373,651 373,651
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,350 59,350 59,350 59,350 59,350 59,350 59,350 59,350 59,350 59,350
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 70,150 70,150 70,150 70,150 70,150 70,150 70,150 70,150 70,150 70,150
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 78,014 78,014 78,014 78,014 78,014 78,014 78,014 78,014 78,014 78,014
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 91,745 91,745 91,745 91,745 91,745 91,745 91,745 91,745 91,745 91,745
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,864 55,864 55,864 55,864 55,864 55,864 55,864 55,864 55,864 55,864
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 63,626 63,626 63,626 63,626 63,626 63,626 63,626 63,626 63,626 63,626
12.8 STRIP TELEFÓNICO 10 PARES UN ### 147,617 147,617 147,617 147,617 147,617 147,617 147,617 147,617 147,617 147,617
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 57,315 57,315 57,315 57,315 57,315 57,315 57,315 57,315 57,315 57,315
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 131,575 131,575 131,575 131,575 131,575 131,575 131,575 131,575 131,575 131,575
12.11 SALIDA T.V PVC COMPLETA. UN ### 78,802 78,802 78,802 78,802 78,802 78,802 78,802 78,802 78,802 78,802
12.12 SALIDA BIFÁSICA C.N. UN ### 46,712 46,712 46,712 46,712 46,712 46,712 46,712 46,712 46,712 46,712
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 98,796 98,796 98,796 98,796 98,796 98,796 98,796 98,796 98,796 98,796
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 422,169 422,169 422,169 422,169 422,169 422,169 422,169 422,169 422,169 422,169
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 561,625 561,625 561,625 561,625 561,625 561,625 561,625 561,625 561,625 561,625
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,633 3,633 3,633 3,633 3,633 3,633 3,633 3,633 3,633 3,633
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,802 4,802 4,802 4,802 4,802 4,802 4,802 4,802 4,802 4,802
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,461 7,461 7,461 7,461 7,461 7,461 7,461 7,461 7,461 7,461
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,353 13,353 13,353 13,353 13,353 13,353 13,353 13,353 13,353 13,353
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 280,240 280,240 280,240 280,240 280,240 280,240 280,240 280,240 280,240 280,240
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 79,418 79,418 79,418 79,418 79,418 79,418 79,418 79,418 79,418 79,418
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 107,114 107,114 107,114 107,114 107,114 107,114 107,114 107,114 107,114 107,114
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,379 44,379 44,379 44,379 44,379 44,379 44,379 44,379 44,379 44,379
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,440,975 1,440,975 1,440,975 1,440,975 1,440,975 1,440,975 1,440,975 1,440,975 1,440,975 1,440,975
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,067,905 1,067,905 1,067,905 1,067,905 1,067,905 1,067,905 1,067,905 1,067,905 1,067,905 1,067,905
12.26 POSTE METÁLICO 6M UN ### 1,323,688 1,323,688 1,323,688 1,323,688 1,323,688 1,323,688 1,323,688 1,323,688 1,323,688 1,323,688
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 614,597 614,597 614,597 614,597 614,597 614,597 614,597 614,597 614,597 614,597
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 113,069 113,069 113,069 113,069 113,069 113,069 113,069 113,069 113,069 113,069
12.29 LUMINARIA 70W SODIO UN ### 515,392 515,392 515,392 515,392 515,392 515,392 515,392 515,392 515,392 515,392
12.30 LUMINARIA 150W SODIO UN ### 644,425 644,425 644,425 644,425 644,425 644,425 644,425 644,425 644,425 644,425
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,699,718 1,699,718 1,699,718 1,699,718 1,699,718 1,699,718 1,699,718 1,699,718 1,699,718 1,699,718
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,252,090 1,252,090 1,252,090 1,252,090 1,252,090 1,252,090 1,252,090 1,252,090 1,252,090 1,252,090

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,292 41,911 42,066 42,004 41,942 42,344 42,592 41,973 41,694 42,251
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 40,694 41,313 41,468 41,406 41,344 41,746 41,994 41,375 41,096 41,653
13.3 ALISTADO PARA LISTÓN M2 ### 15,458 15,582 15,613 15,601 15,588 15,669 15,718 15,595 15,539 15,650
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 29,000 30,239 30,549 30,425 30,301 31,106 31,601 30,363 29,805 30,920
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 87,342 88,580 88,890 88,766 88,642 89,447 89,943 88,704 88,147 89,261
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,805 28,192 28,289 28,250 28,211 28,463 28,618 28,231 28,057 28,405
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 58,346 60,228 60,698 60,510 60,322 61,545 62,297 60,416 59,569 61,262
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 80,189 83,199 83,951 83,650 83,349 85,306 86,510 83,500 82,145 84,854
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,441 31,441 31,441 31,441 31,441 31,441 31,441 31,441 31,441 31,441
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,066 24,066 24,066 24,066 24,066 24,066 24,066 24,066 24,066 24,066
13.11 PERMA PLY 2 CAPAS M2 ### 28,338 28,338 28,338 28,338 28,338 28,338 28,338 28,338 28,338 28,338
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 47,245 48,938 49,361 49,192 49,022 50,123 50,800 49,107 48,345 49,869
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ###
p 55,214 57,284 57,801 57,594 57,387 58,732 59,560 57,491 56,559 58,422
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### i 79,654 82,852 83,652 83,332 83,012 85,091 86,370 83,172 81,733 84,611
13.15 TRITURADO FINO 1/2 M3 ### o 93,546 107,703 111,242 109,825 108,410 117,611 123,274 109,118 102,747 115,488
13.16 TRITURADO GRUESO 3/4 M3 ### 97,488 108,787 111,413 110,999 115,760 124,815 129,653 117,160 105,349 119,419

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 59,492 59,740 59,802 59,777 59,753 59,914 60,013 59,765 59,653 59,876
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,757 35,881 35,912 35,899 35,887 35,967 36,017 35,893 35,837 35,949
14.3 ADOQUÍN CONCRETO 6CM M2 ### 67,997 68,616 68,771 68,709 68,647 69,050 69,298 68,678 68,400 68,957
14.4 ADOQUÍN CONCRETO 8CM M2 ### 71,397 72,016 72,171 72,109 72,047 72,450 72,698 72,078 71,800 72,357
14.5 ADOQUÍN GRES PEATONAL M2 ### 75,825 76,445 76,599 76,538 76,476 76,878 77,126 76,507 76,228 76,785
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO
M2 ### 78,035 78,283 78,345 78,320 78,295 78,456 78,555 78,307 78,196 78,419
14.7 GRAVILLA PARA GRADAS ML ### 39,638 39,893 39,957 39,932 39,906 40,072 40,174 39,919 39,804 40,034
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 169,520 170,634 170,913 170,802 170,690 171,415 171,860 170,746 170,244 171,247
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 49,114 49,749 49,907 49,844 49,780 50,193 50,447 49,812 49,526 50,098
14.10 GUARDAESCOBA EN GRANITO ML ### 46,300 46,300 46,300 46,300 46,300 46,300 46,300 46,300 46,300 46,300
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,750 11,005 11,069 11,044 11,018 11,184 11,286 11,031 10,916 11,146
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,672 9,672 9,672 9,672 9,672 9,672 9,672 9,672 9,672 9,672
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,957 12,957 12,957 12,957 12,957 12,957 12,957 12,957 12,957 12,957
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,020 11,020 11,020 11,020 11,020 11,020 11,020 11,020 11,020 11,020
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,284 18,284 18,284 18,284 18,284 18,284 18,284 18,284 18,284 18,284
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,375 35,375 35,375 35,375 35,375 35,375 35,375 35,375 35,375 35,375
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,829 9,829 9,829 9,829 9,829 9,829 9,829 9,829 9,829 9,829
14.18 LISTÓN M.H. AMARILLO M2 ### 77,617 77,617 77,617 77,617 77,617 77,617 77,617 77,617 77,617 77,617
14.19 PASO ESCALERA GRANITO ML ### 124,011 124,878 125,095 125,008 124,922 125,485 125,832 124,965 124,575 125,355
14.20 PIRLANES ALUMINIO ML ### 8,084 8,084 8,084 8,084 8,084 8,084 8,084 8,084 8,084 8,084
14.21 PIRLANES LADRILLO ML ### 33,479 33,651 33,694 33,677 33,660 33,772 33,840 33,668 33,591 33,746
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 47,526 47,526 47,526 47,526 47,526 47,526 47,526 47,526 47,526 47,526
14.23 PISO VINILO TRÁFICO PESADO M2 ### 55,110 55,110 55,110 55,110 55,110 55,110 55,110 55,110 55,110 55,110
14.24 PULIDA LACADA PISO MADERA M2 ### 51,531 51,531 51,531 51,531 51,531 51,531 51,531 51,531 51,531 51,531
14.25 TABLETA DE GRES 25X25 M2 ### 51,684 51,932 51,994 51,969 51,944 52,105 52,204 51,957 51,845 52,068
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 57,888 58,136 58,198 58,173 58,148 58,309 58,408 58,160 58,049 58,272
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,595 11,595 11,595 11,595 11,595 11,595 11,595 11,595 11,595 11,595
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 51,251 51,509 51,574 51,548 51,522 51,690 51,793 51,535 51,419 51,651
14.29 JABONERA PORCELANA ACUARIO UN ### 21,390 21,390 21,390 21,390 21,390 21,390 21,390 21,390 21,390 21,390
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE)
UN ### 127,526 127,526 127,526 127,526 127,526 127,526 127,526 127,526 127,526 127,526
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,552 10,552 10,552 10,552 10,552 10,552 10,552 10,552 10,552 10,552
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,414 23,414 23,414 23,414 23,414 23,414 23,414 23,414 23,414 23,414
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,164 15,164 15,164 15,164 15,164 15,164 15,164 15,164 15,164 15,164
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,743 14,743 14,743 14,743 14,743 14,743 14,743 14,743 14,743 14,743
14.35 REMATES BOCEL ALUMINIO ML ### 9,103 9,103 9,103 9,103 9,103 9,103 9,103 9,103 9,103 9,103
14.36 REMATES BOCEL PORCELANA ML ### 9,257 9,257 9,257 9,257 9,257 9,257 9,257 9,257 9,257 9,257
14.37 TAPA REGISTRO 20X20 UN ### 19,897 19,897 19,897 19,897 19,897 19,897 19,897 19,897 19,897 19,897
14.38 TAPA REGISTRO 6X6 UN ### 18,168 18,168 18,168 18,168 18,168 18,168 18,168 18,168 18,168 18,168
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 19,126 19,126 19,126 19,126 19,126 19,126 19,126 19,126 19,126 19,126
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO
M2 ### 22,110 22,110 22,110 22,110 22,110 22,110 22,110 22,110 22,110 22,110
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 67,622 67,870 67,932 67,907 67,882 68,043 68,142 67,895 67,783 68,006
14.42 MEDIA CAÑA EN GRANITO ML ### 79,731 79,731 79,731 79,731 79,731 79,731 79,731 79,731 79,731 79,731
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,559 36,559 36,559 36,559 36,559 36,559 36,559 36,559 36,559 36,559
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
14.44 PINTURA ACRÍLICA PARA PISOS M2 ###
p 13,876 13,876 13,876 13,876 13,876 13,876 13,876 13,876 13,876 13,876
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### i 104,314 104,314 104,314 104,314 104,314 104,314 104,314 104,314 104,314 104,314
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### o 126,617 126,617 126,617 126,617 126,617 126,617 126,617 126,617 126,617 126,617

15 CIELO RASO
15.1 APLIQUE YESO ML ### 74,968 74,968 74,968 74,968 74,968 74,968 74,968 74,968 74,968 74,968
15.2 ARMADURA MADERA Y MALLA M2 ### 38,130 38,130 38,130 38,130 38,130 38,130 38,130 38,130 38,130 38,130
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 57,946 57,946 57,946 57,946 57,946 57,946 57,946 57,946 57,946 57,946
15.4 CIELO RASO DURACUSTIC M2 ### 70,821 70,821 70,821 70,821 70,821 70,821 70,821 70,821 70,821 70,821
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 52,969 52,969 52,969 52,969 52,969 52,969 52,969 52,969 52,969 52,969
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 97,696 97,696 97,696 97,696 97,696 97,696 97,696 97,696 97,696 97,696
15.7 CORNISAS YESO ML ### 50,244 50,244 50,244 50,244 50,244 50,244 50,244 50,244 50,244 50,244
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 107,714 107,714 107,714 107,714 107,714 107,714 107,714 107,714 107,714 107,714
15.9 MALLA CON VENA M2 ### 14,254 14,254 14,254 14,254 14,254 14,254 14,254 14,254 14,254 14,254

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE


16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 78,610 75,095 73,337 76,853 103,217 108,489 108,489 106,732 78,610 92,671
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 96,370 110,857 114,478 113,030 111,581 120,997 126,792 112,306 105,786 118,824
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 149,320 149,320 149,320 187,987 149,320 149,320 187,987 187,987 187,987 170,411
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 77,494 73,979 72,221 75,737 102,101 107,373 107,373 105,616 77,494 91,555
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 139,781 139,781 139,781 178,449 139,781 139,781 178,449 178,449 178,449 160,873
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 145,754 145,754 145,754 184,421 145,754 145,754 184,421 184,421 184,421 166,845

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 311,402 311,402 311,402 311,402 311,402 311,402 311,402 311,402 311,402 311,402
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 GRIFERÍA) UN ### 913,508 913,508 913,508 913,508 913,508 913,508 913,508 913,508 913,508 913,508

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 495,935 495,935 495,935 495,935 495,935 495,935 495,935 495,935 495,935 495,935

17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 145,764 145,764 145,764 145,764 145,764 145,764 145,764 145,764 145,764 145,764

17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 202,751 202,751 202,751 202,751 202,751 202,751 202,751 202,751 202,751 202,751
SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
17.6 GRIFERÍA)
UN ### 188,468 188,468 188,468 188,468 188,468 188,468 188,468 188,468 188,468 188,468
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 411,971 411,971 411,971 411,971 411,971 411,971 411,971 411,971 411,971 411,971
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
17.8 GRIFERÍA)
UN ### 1,050,157 1,050,157 1,050,157 1,050,157 1,050,157 1,050,157 1,050,157 1,050,157 1,050,157 1,050,157
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 299,929 299,929 299,929 299,929 299,929 299,929 299,929 299,929 299,929 299,929
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 213,450 213,450 213,450 213,450 213,450 213,450 213,450 213,450 213,450 213,450
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 86,290 86,290 86,290 86,290 86,290 86,290 86,290 86,290 86,290 86,290
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### p 257,608 257,608 257,608 257,608 257,608 257,608 257,608 257,608 257,608 257,608
i
o
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 378,331 378,331 378,331 378,331 378,331 378,331 378,331 378,331 378,331 378,331

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,758 8,758 8,758 8,758 8,758 8,758 8,758 8,758 8,758 8,758
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,228 3,228 3,228 3,228 3,228 3,228 3,228 3,228 3,228 3,228
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,759 11,759 11,759 11,759 11,759 11,759 11,759 11,759 11,759 11,759
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,141 44,141 44,141 44,141 44,141 44,141 44,141 44,141 44,141 44,141
18.5 CARBURO SOBRE PAÑETES M2 ### 6,157 6,157 6,157 6,157 6,157 6,157 6,157 6,157 6,157 6,157
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 67,465 67,465 67,465 67,465 67,465 67,465 67,465 67,465 67,465 67,465
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,677 3,677 3,677 3,677 3,677 3,677 3,677 3,677 3,677 3,677
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,904 2,904 2,904 2,904 2,904 2,904 2,904 2,904 2,904 2,904
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,647 14,647 14,647 14,647 14,647 14,647 14,647 14,647 14,647 14,647
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,230 4,230 4,230 4,230 4,230 4,230 4,230 4,230 4,230 4,230
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,438 15,438 15,438 15,438 15,438 15,438 15,438 15,438 15,438 15,438
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,960 5,960 5,960 5,960 5,960 5,960 5,960 5,960 5,960 5,960
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,800 6,800 6,800 6,800 6,800 6,800 6,800 6,800 6,800 6,800
18.14 ESTUCO M2 ### 7,432 7,432 7,432 7,432 7,432 7,432 7,432 7,432 7,432 7,432
18.15 ESTUCO (LINEAL) ML ### 4,665 4,665 4,665 4,665 4,665 4,665 4,665 4,665 4,665 4,665
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,328 16,328 16,328 16,328 16,328 16,328 16,328 16,328 16,328 16,328
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,156 10,156 10,156 10,156 10,156 10,156 10,156 10,156 10,156 10,156
18.18 LACA PISOS MADERA M2 ### 24,087 24,087 24,087 24,087 24,087 24,087 24,087 24,087 24,087 24,087
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,832 2,832 2,832 2,832 2,832 2,832 2,832 2,832 2,832 2,832
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,655 12,655 12,655 12,655 12,655 12,655 12,655 12,655 12,655 12,655
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,420 3,420 3,420 3,420 3,420 3,420 3,420 3,420 3,420 3,420
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,221 13,221 13,221 13,221 13,221 13,221 13,221 13,221 13,221 13,221
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,448 7,448 7,448 7,448 7,448 7,448 7,448 7,448 7,448 7,448
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,711 22,711 22,711 22,711 22,711 22,711 22,711 22,711 22,711 22,711
18.26 PINTURA EPÓXICA M2 ### 13,375 13,375 13,375 13,375 13,375 13,375 13,375 13,375 13,375 13,375
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,287 8,287 8,287 8,287 8,287 8,287 8,287 8,287 8,287 8,287

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,206,627 6,206,627 6,206,627 6,206,627 6,206,627 6,206,627 6,206,627 6,206,627 6,206,627 6,206,627
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES
19.2 Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,966,206 10,966,206 10,966,206 10,966,206 10,966,206 10,966,206 10,966,206 10,966,206 10,966,206 10,966,206
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,870,138 2,870,138 2,870,138 2,870,138 2,870,138 2,870,138 2,870,138 2,870,138 2,870,138 2,870,138
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,379,165 9,379,165 9,379,165 9,379,165 9,379,165 9,379,165 9,379,165 9,379,165 9,379,165 9,379,165
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,781,937 8,781,937 8,781,937 8,781,937 8,781,937 8,781,937 8,781,937 8,781,937 8,781,937 8,781,937
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,832 2,832 2,832 2,832 2,832 2,832 2,832 2,832 2,832 2,832
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 882,249 882,249 882,249 882,249 882,249 882,249 882,249 882,249 882,249 882,249
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 87,957 87,957 87,957 87,957 87,957 87,957 87,957 87,957 87,957 87,957
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,594,194 1,594,387 1,594,436 1,594,416 1,594,397 1,594,523 1,594,600 1,594,407 1,594,320 1,594,494
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 691,049 695,669 696,824 696,362 695,900 698,903 700,751 696,131 694,052 698,210

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,253 30,253 30,253 30,253 30,253 30,253 30,253 30,253 30,253 30,253
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,872 44,872 44,872 44,872 44,872 44,872 44,872 44,872 44,872 44,872
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 55,612 55,612 55,612 55,612 55,612 55,612 55,612 55,612 55,612 55,612
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,217 18,217 18,217 18,217 18,217 18,217 18,217 18,217 18,217 18,217
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### p 22,055 22,055 22,055 22,055 22,055 22,055 22,055 22,055 22,055 22,055
i
o
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,036 30,036 30,036 30,036 30,036 30,036 30,036 30,036 30,036 30,036
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,938 26,938 26,938 26,938 26,938 26,938 26,938 26,938 26,938 26,938
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,410 28,410 28,410 28,410 28,410 28,410 28,410 28,410 28,410 28,410
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,501 35,501 35,501 35,501 35,501 35,501 35,501 35,501 35,501 35,501
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,198 18,198 18,198 18,198 18,198 18,198 18,198 18,198 18,198 18,198
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,817 23,817 23,817 23,817 23,817 23,817 23,817 23,817 23,817 23,817
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,557 36,557 36,557 36,557 36,557 36,557 36,557 36,557 36,557 36,557
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 279,197 279,197 279,197 279,197 279,197 279,197 279,197 279,197 279,197 279,197
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 321,263 321,263 321,263 321,263 321,263 321,263 321,263 321,263 321,263 321,263
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 335,170 335,170 335,170 335,170 335,170 335,170 335,170 335,170 335,170 335,170
20.16 ACOMETIDA GAS 1/2" ML ### 311,578 311,578 311,578 311,578 311,578 311,578 311,578 311,578 311,578 311,578

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 227,575 227,575 227,575 227,575 227,575 227,575 227,575 227,575 227,575 227,575
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 34,769 34,769 34,769 34,769 34,769 34,769 34,769 34,769 34,769 34,769
21.3 SIRENA DE 110 V UN ### 106,605 106,605 106,605 106,605 106,605 106,605 106,605 106,605 106,605 106,605
21.4 CÁMARA CCTV UN ### 273,580 273,580 273,580 273,580 273,580 273,580 273,580 273,580 273,580 273,580
21.5 PARLANTE-CIELO FALSO UN ### 53,962 53,962 53,962 53,962 53,962 53,962 53,962 53,962 53,962 53,962
21.6 AMPLIFICADOR 100W UN ### 589,926 589,926 589,926 589,926 589,926 589,926 589,926 589,926 589,926 589,926
21.7 AMPLIFICADOR 300W UN ### 1,456,444 1,456,444 1,456,444 1,456,444 1,456,444 1,456,444 1,456,444 1,456,444 1,456,444 1,456,444
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,613 47,613 47,613 47,613 47,613 47,613 47,613 47,613 47,613 47,613
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 227,256 227,256 227,256 227,256 227,256 227,256 227,256 227,256 227,256 227,256
21.10 TOMA PARA MICRÓFONO UN ### 45,871 45,871 45,871 45,871 45,871 45,871 45,871 45,871 45,871 45,871
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,885 3,885 3,885 3,885 3,885 3,885 3,885 3,885 3,885 3,885
21.12 SPLITERS UN ### 6,481 6,481 6,481 6,481 6,481 6,481 6,481 6,481 6,481 6,481
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,634 19,634 19,634 19,634 19,634 19,634 19,634 19,634 19,634 19,634
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,651 25,651 25,651 25,651 25,651 25,651 25,651 25,651 25,651 25,651
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,269 33,269 33,269 33,269 33,269 33,269 33,269 33,269 33,269 33,269
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 126,225 126,225 126,225 126,225 126,225 126,225 126,225 126,225 126,225 126,225
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,947 32,947 32,947 32,947 32,947 32,947 32,947 32,947 32,947 32,947
21.18 BANDEJA PORTACABLES PARA RACK UN ### 107,419 107,419 107,419 107,419 107,419 107,419 107,419 107,419 107,419 107,419
21.19 RACK 2' X 24" UN ### 191,811 191,811 191,811 191,811 191,811 191,811 191,811 191,811 191,811 191,811
21.20 RACK 3' X 24" UN ### 298,970 298,970 298,970 298,970 298,970 298,970 298,970 298,970 298,970 298,970
21.21 RACK 5' X 24" UN ### 372,495 372,495 372,495 372,495 372,495 372,495 372,495 372,495 372,495 372,495
21.22 RACK 7' X 24" UN ### 406,406 406,406 406,406 406,406 406,406 406,406 406,406 406,406 406,406 406,406
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 598,629 598,629 598,629 598,629 598,629 598,629 598,629 598,629 598,629 598,629
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 353,646 353,646 353,646 353,646 353,646 353,646 353,646 353,646 353,646 353,646
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 107,016 107,016 107,016 107,016 107,016 107,016 107,016 107,016 107,016 107,016
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,201 14,201 14,201 14,201 14,201 14,201 14,201 14,201 14,201 14,201
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,986 28,986 28,986 28,986 28,986 28,986 28,986 28,986 28,986 28,986
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,193 5,193 5,193 5,193 5,193 5,193 5,193 5,193 5,193 5,193
21.29 CANALETA METÁLICA 4X6 CMS ML ### 36,745 36,745 36,745 36,745 36,745 36,745 36,745 36,745 36,745 36,745
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,362 38,362 38,362 38,362 38,362 38,362 38,362 38,362 38,362 38,362
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,169 39,169 39,169 39,169 39,169 39,169 39,169 39,169 39,169 39,169
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,566 25,566 25,566 25,566 25,566 25,566 25,566 25,566 25,566 25,566
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,225 28,225 28,225 28,225 28,225 28,225 28,225 28,225 28,225 28,225
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,342 29,342 29,342 29,342 29,342 29,342 29,342 29,342 29,342 29,342
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 48,977 48,977 48,977 48,977 48,977 48,977 48,977 48,977 48,977 48,977
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 631,298 631,298 631,298 631,298 631,298 631,298 631,298 631,298 631,298 631,298
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 325,283 325,283 325,283 325,283 325,283 325,283 325,283 325,283 325,283 325,283
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 92,514 92,514 92,514 92,514 92,514 92,514 92,514 92,514 92,514 92,514
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,911 1,911 1,911 1,911 1,911 1,911 1,911 1,911 1,911 1,911
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
21.40 CABLE TELEFÓNICO 10 PARES ML ###
p 8,809 8,809 8,809 8,809 8,809 8,809 8,809 8,809 8,809 8,809
21.41 CABLE TELEFÓNICO 20 PARES ML ### i 13,070 13,070 13,070 13,070 13,070 13,070 13,070 13,070 13,070 13,070
21.42 CABLE TELEFÓNICO 40 PARES ML ### o 21,761 21,761 21,761 21,761 21,761 21,761 21,761 21,761 21,761 21,761
21.43 CABLE TELEVISIÓN RG6 ML ### 4,057 4,057 4,057 4,057 4,057 4,057 4,057 4,057 4,057 4,057
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,619 23,619 23,619 23,619 23,619 23,619 23,619 23,619 23,619 23,619
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,191 34,191 34,191 34,191 34,191 34,191 34,191 34,191 34,191 34,191
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,266 20,266 20,266 20,266 20,266 20,266 20,266 20,266 20,266 20,266
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,956 15,956 15,956 15,956 15,956 15,956 15,956 15,956 15,956 15,956
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 634,625 634,625 634,625 634,625 634,625 634,625 634,625 634,625 634,625 634,625
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
p URBANISMO
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 27,904 27,904 27,904 27,904 27,904 27,904 27,904 27,904 27,904 27,904
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 92,975 92,975 92,975 92,975 92,975 92,975 92,975 92,975 92,975 92,975
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 522,220 522,220 522,220 522,220 522,220 522,220 522,220 522,220 522,220 522,220
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,114,517 1,114,517 1,114,517 1,114,517 1,114,517 1,114,517 1,114,517 1,114,517 1,114,517 1,114,517
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 127,975 127,975 127,975 127,975 127,975 127,975 127,975 127,975 127,975 127,975
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 777,968 777,968 777,968 777,968 777,968 777,968 777,968 777,968 777,968 777,968
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,673,363 1,673,363 1,673,363 1,673,363 1,673,363 1,673,363 1,673,363 1,673,363 1,673,363 1,673,363
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,652 13,652 13,652 13,652 13,652 13,652 13,652 13,652 13,652 13,652
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,768 16,768 16,768 16,768 16,768 16,768 16,768 16,768 16,768 16,768
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,977 20,977 20,977 20,977 20,977 20,977 20,977 20,977 20,977 20,977
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,930 22,930 22,930 22,930 22,930 22,930 22,930 22,930 22,930 22,930
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,429 27,429 27,429 27,429 27,429 27,429 27,429 27,429 27,429 27,429
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,429 27,429 27,429 27,429 27,429 27,429 27,429 27,429 27,429 27,429
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 109,277 109,277 109,277 109,277 109,277 109,277 109,277 109,277 109,277 109,277
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 126,615 126,615 126,615 126,615 126,615 126,615 126,615 126,615 126,615 126,615
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 391,654 391,654 391,654 391,654 391,654 391,654 391,654 391,654 391,654 391,654
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 147,013 147,013 147,013 147,013 147,013 147,013 147,013 147,013 147,013 147,013
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 242,353 242,353 242,353 242,353 242,353 242,353 242,353 242,353 242,353 242,353
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,071,502 1,071,502 1,071,502 1,071,502 1,071,502 1,071,502 1,071,502 1,071,502 1,071,502 1,071,502
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,234,411 1,234,411 1,234,411 1,234,411 1,234,411 1,234,411 1,234,411 1,234,411 1,234,411 1,234,411
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,707 14,707 14,707 14,707 14,707 14,707 14,707 14,707 14,707 14,707
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,005 13,005 13,005 13,005 13,005 13,005 13,005 13,005 13,005 13,005
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,568 31,568 31,568 31,568 31,568 31,568 31,568 31,568 31,568 31,568
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 125,900 125,900 125,900 125,900 125,900 125,900 125,900 125,900 125,900 125,900
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 187,100 187,100 187,100 187,100 187,100 187,100 187,100 187,100 187,100 187,100
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,762 30,762 30,762 30,762 30,762 30,762 30,762 30,762 30,762 30,762
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 105,673 105,673 105,673 105,673 105,673 105,673 105,673 105,673 105,673 105,673
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 156,214 156,214 156,214 156,214 156,214 156,214 156,214 156,214 156,214 156,214
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 31,010 31,010 31,010 31,010 31,010 31,010 31,010 31,010 31,010 31,010
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 63,845 63,845 63,845 63,845 63,845 63,845 63,845 63,845 63,845 63,845
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 256,348 256,348 256,348 256,348 256,348 256,348 256,348 256,348 256,348 256,348
1.32 UNIÓN REPARACION PVC 4" UN ### 74,426 74,426 74,426 74,426 74,426 74,426 74,426 74,426 74,426 74,426
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 298,127 298,127 298,127 298,127 298,127 298,127 298,127 298,127 298,127 298,127
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 179,680 179,680 179,680 179,680 179,680 179,680 179,680 179,680 179,680 179,680
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 508,815 508,815 508,815 508,815 508,815 508,815 508,815 508,815 508,815 508,815
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,359,615 1,359,615 1,359,615 1,359,615 1,359,615 1,359,615 1,359,615 1,359,615 1,359,615 1,359,615
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,008,838 2,008,838 2,008,838 2,008,838 2,008,838 2,008,838 2,008,838 2,008,838 2,008,838 2,008,838

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,301 11,301 11,301 11,301 11,301 11,301 11,301 11,301 11,301 11,301
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,881 25,881 25,881 25,881 25,881 25,881 25,881 25,881 25,881 25,881
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 77,035 90,864 94,320 92,937 91,555 100,543 106,074 92,246 86,023 98,469
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 73,318 69,803 68,046 71,561 97,925 103,198 103,198 101,440 73,318 87,379
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 83,048 79,532 77,775 81,290 107,654 112,927 112,927 111,169 83,048 97,108
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 94,048 97,123 97,123 94,048 96,098 119,669 94,048 94,048 94,048 104,297
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 75,816 76,861 78,950 75,816 77,906 101,935 70,592 75,816 75,816 90,443
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 74,529 85,705 88,500 87,382 86,264 93,530 97,999 86,823 81,793 91,853

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 116,799 116,799 116,799 116,799 116,799 116,799 116,799 116,799 116,799 116,799
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,215,705 1,215,705 1,215,705 1,215,705 1,215,705 1,215,705 1,215,705 1,215,705 1,215,705 1,215,705
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ###
p 152,568 152,568 152,568 152,568 152,568 152,568 152,568 152,568 152,568 152,568
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### i 1,408,048 1,408,048 1,408,048 1,408,048 1,408,048 1,408,048 1,408,048 1,408,048 1,408,048 1,408,048
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### o 981,563 981,563 981,563 981,563 981,563 981,563 981,563 981,563 981,563 981,563
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,109 63,109 63,109 63,109 63,109 63,109 63,109 63,109 63,109 63,109
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 115,946 115,946 115,946 115,946 115,946 115,946 115,946 115,946 115,946 115,946
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 273,547 273,547 273,547 273,547 273,547 273,547 273,547 273,547 273,547 273,547
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 439,065 439,065 439,065 439,065 439,065 439,065 439,065 439,065 439,065 439,065
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 115,995 115,995 115,995 115,995 115,995 115,995 115,995 115,995 115,995 115,995
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 115,995 115,995 115,995 115,995 115,995 115,995 115,995 115,995 115,995 115,995
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553 273,553
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 439,065 439,065 439,065 439,065 439,065 439,065 439,065 439,065 439,065 439,065
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 441,880 441,880 441,880 441,880 441,880 441,880 441,880 441,880 441,880 441,880
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 716,639 716,639 716,639 716,639 716,639 716,639 716,639 716,639 716,639 716,639
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,149,911 1,149,911 1,149,911 1,149,911 1,149,911 1,149,911 1,149,911 1,149,911 1,149,911 1,149,911
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 71,180 71,180 71,180 71,180 71,180 71,180 71,180 71,180 71,180 71,180
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 369,989 369,989 369,989 369,989 369,989 369,989 369,989 369,989 369,989 369,989
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 414,041 414,041 414,041 414,041 414,041 414,041 414,041 414,041 414,041 414,041
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,145,571 1,145,571 1,145,571 1,145,571 1,145,571 1,145,571 1,145,571 1,145,571 1,145,571 1,145,571
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 66,967 67,082 67,111 67,099 67,087 67,162 67,208 67,093 67,041 67,145
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 335,538 335,538 335,538 335,538 335,538 335,538 335,538 335,538 335,538 335,538
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 51,075 51,075 51,075 51,075 51,075 51,075 51,075 51,075 51,075 51,075
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 72,147 72,147 72,147 72,147 72,147 72,147 72,147 72,147 72,147 72,147
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 104,017 104,017 104,017 104,017 104,017 104,017 104,017 104,017 104,017 104,017
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 159,622 159,622 159,622 159,622 159,622 159,622 159,622 159,622 159,622 159,622
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 256,352 256,352 256,352 256,352 256,352 256,352 256,352 256,352 256,352 256,352
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 372,408 372,408 372,408 372,408 372,408 372,408 372,408 372,408 372,408 372,408
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 471,110 471,110 471,110 471,110 471,110 471,110 471,110 471,110 471,110 471,110
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 619,385 619,385 619,385 619,385 619,385 619,385 619,385 619,385 619,385 619,385
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 851,515 851,515 851,515 851,515 851,515 851,515 851,515 851,515 851,515 851,515

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO)
UN ### 680,468 691,556 694,328 693,219 692,110 699,318 703,753 692,665 687,675 697,655

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE


4.2 INTERNO E=1.5CM Y CAÑUELA) ML ### 666,702 674,591 676,564 675,775 674,986 680,114 683,270 675,381 671,830 678,931

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO


4.3 (INCLUYE ARO Y TAPA HF) UN ### 726,407 733,800 735,648 734,908 734,169 738,974 741,931 734,539 731,212 737,865

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON


4.4 REFUERZO) UN ### 806,417 820,278 823,743 822,356 820,970 829,980 835,524 821,664 815,426 827,901

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE


4.5 INTERNO E=1.5CM Y CAÑUELA)
ML ### 943,751 954,860 957,638 956,527 955,416 962,637 967,081 955,972 950,972 960,971

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO


4.6 (INCLUYE ARO Y TAPA HF) UN ### 836,596 846,760 849,301 848,284 847,268 853,875 857,941 847,777 843,202 852,351
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,031,708 1,036,795 1,038,069 1,037,560 1,037,047 1,040,356 1,042,391 1,037,304 1,035,013 1,039,595
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,485,955 1,501,100 1,504,891 1,503,375 1,501,854 1,511,702 1,517,761 1,502,615 1,495,796 1,509,434
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,012,651 2,041,980 2,049,314 2,046,379 2,043,446 2,062,511 2,074,243 2,044,914 2,031,715 2,058,112
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,665,078 2,713,831 2,726,022 2,721,143 2,716,267 2,747,958 2,767,460 2,718,707 2,696,766 2,740,646
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,873,545 1,873,545 1,873,545 1,873,545 1,873,545 1,873,545 1,873,545 1,873,545 1,873,545 1,873,545
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,953,871 3,953,871 3,953,871 3,953,871 3,953,871 3,953,871 3,953,871 3,953,871 3,953,871 3,953,871
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 143,707 144,029 144,110 144,077 144,045 144,254 144,383 144,061 143,916 144,206

5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ###
p 74,186 74,788 74,939 74,879 74,818 75,210 75,450 74,848 74,578 75,119
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### i 87,862 88,464 88,615 88,555 88,494 88,886 89,126 88,524 88,254 88,795
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### o 56,029 58,004 58,498 58,300 58,103 59,387 60,177 58,202 57,313 59,091
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 60,867 62,808 63,293 63,099 62,905 64,166 64,942 63,002 62,129 63,875
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 61,062 62,939 63,409 63,221 63,033 64,253 65,004 63,127 62,282 63,972
5.6 BORDE SEPARADOR VERDE A-170 ML ### 258,039 258,361 258,442 258,410 258,378 258,587 258,716 258,394 258,249 258,539
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,099 19,336 19,395 19,371 19,348 19,502 19,597 19,359 19,253 19,466
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,176 41,568 41,916 41,777 41,638 42,543 43,100 41,708 41,081 42,334
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 85,513 85,685 85,728 85,711 85,694 85,806 85,875 85,702 85,625 85,780
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 571,737 576,113 577,207 576,770 576,332 579,176 580,927 576,551 574,581 578,520
5.11 LOSETA PREFABRICADA A-40 M2 ### 64,192 64,929 65,113 65,039 64,966 65,445 65,739 65,002 64,671 65,334
5.12 LOSETA PREFABRICADA A-60 M2 ### 92,510 93,247 93,432 93,358 93,284 93,763 94,058 93,321 92,989 93,653
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 33,935 34,711 34,905 34,827 34,750 35,254 35,565 34,789 34,439 35,138

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 54,142 55,713 56,106 55,948 55,791 56,812 57,441 55,870 55,163 56,577
5.15 SARDINEL PREFABRICADO A-10 ML ### 99,743 99,916 99,959 104,319 99,924 100,036 104,483 104,311 104,233 102,398
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 61,807 62,253 62,364 62,320 62,275 62,565 62,743 62,298 62,097 62,498

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 206,664 207,588 207,819 207,727 207,634 208,235 208,604 207,680 207,265 208,096
6.2 BANCA EN CONCRETO M-30 UN ### 677,143 678,437 678,760 678,631 678,501 679,342 679,860 678,566 677,984 679,148
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 219,384 219,577 219,626 219,606 219,587 219,713 219,790 219,597 219,510 219,684
6.4 BOLARDO M-60 CONCRETO UN ### 165,233 166,342 166,619 166,508 166,397 167,118 167,561 166,453 165,954 166,952
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 167,213 168,321 168,599 168,488 168,377 169,098 169,541 168,432 167,933 168,931
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 195,676 196,836 197,127 197,010 196,894 197,649 198,113 196,952 196,430 197,475
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 59,987 60,448 60,563 60,517 60,471 60,770 60,954 60,494 60,286 60,701
6.8 BORDILLO PREFABRICADO A-80 ML ### 68,424 68,940 69,069 69,018 68,966 69,301 69,508 68,992 68,760 69,224
6.9 CANECA M-120 UN ### 316,804 316,919 316,948 316,937 316,925 317,000 317,046 316,931 316,879 316,983
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 836,238 836,793 836,931 836,876 836,820 837,181 837,403 836,848 836,599 837,098
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,423,076 3,423,445 3,423,538 3,423,501 3,423,464 3,423,704 3,423,852 3,423,482 3,423,316 3,423,648
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,521,260 3,521,629 3,521,722 3,521,685 3,521,648 3,521,888 3,522,036 3,521,666 3,521,500 3,521,832
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 492,567 492,954 493,051 493,012 492,974 493,225 493,380 492,993 492,819 493,167
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 651,786 653,333 653,721 653,566 653,411 654,417 655,036 653,488 652,792 654,185
6.15 BANCA EN MADERA M-50 UN ### 542,830 542,830 542,830 542,830 542,830 542,830 542,830 542,830 542,830 542,830
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 253,098 253,653 253,791 253,736 253,680 254,041 254,262 253,708 253,459 253,958
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 583,077 583,365 583,437 583,408 583,379 583,567 583,682 583,394 583,264 583,523
6.18 POSTE HISTÓRICO M-131 UN ### 6,503,707 6,506,479 6,507,172 6,506,895 6,506,618 6,508,420 6,509,529 6,506,757 6,505,509 6,508,004

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,089 4,089 4,089 4,089 4,089 4,089 4,089 4,089 4,089 4,089
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,214 44,214 44,214 44,214 44,214 44,214 44,214 44,214 44,214 44,214
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 318,739 318,900 318,940 318,924 318,908 319,012 319,077 318,916 318,843 318,988
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 501,565 502,339 502,532 502,455 502,377 502,881 503,190 502,416 502,068 502,764
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 239,432 239,593 239,633 239,617 239,601 239,706 239,770 239,609 239,537 239,682
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 254,163 254,324 254,364 254,348 254,332 254,437 254,501 254,340 254,268 254,413
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 265,318 265,479 265,519 265,503 265,487 265,592 265,656 265,495 265,423 265,568
7.8 TACHAS REFLECTIVAS UN ### 13,779 13,779 13,779 13,779 13,779 13,779 13,779 13,779 13,779 13,779
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,708 14,708 14,708 14,708 14,708 14,708 14,708 14,708 14,708 14,708
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN)
UN ### 119,518 119,518 119,518 119,518 119,518 119,518 119,518 119,518 119,518 119,518
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE


1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE


1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y


1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE


1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,


1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS
M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,909 35,909 35,909 35,909 35,909 35,909 35,909 35,909 35,909 35,909
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494 494 494 494 494 494 494 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES


2.9 600.1 A UNA DISTANCIA MENOR DE 5 KM) M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE


2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 66,300 66,300 66,300 66,300 66,300 66,300 66,300 66,300 66,300 66,300

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE


2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 81,466 81,466 81,466 81,466 81,466 81,466 81,466 81,466 81,466 81,466

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE


2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE


2.13 600.4 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE


2.14 600.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO


2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 139,781 139,781 139,781 178,449 139,781 139,781 178,449 178,449 178,449 160,873
3.3 330.1 BASE GRANULAR M3 ### 145,754 145,754 145,754 184,421 145,754 145,754 184,421 184,421 184,421 166,845
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,264 3,264 3,264 3,264 3,264 3,264 3,264 3,264 3,264 3,264
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,142 1,142 1,142 1,142 1,142 1,142 1,142 1,142 1,142 1,142
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA
3.7 461.1 M3 ### 225,607 229,333 230,265 229,892 229,520 231,941 233,432 229,706 228,029 231,383
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ###
p 67,262 68,384 68,665 68,553 68,440 69,170 69,619 68,497 67,992 69,002
M3 ### i
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO) 592,044 561,624 627,534 630,914 620,774 646,124 652,884 624,154 614,014 581,904
o
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3.10 450.2 P ASFÁLTICO)
M3 ### 659,388 628,968 694,878 698,258 688,118 713,468 720,228 691,498 681,358 649,248

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO


3.11 450.9 P ASFÁLTICO)
M3 ### 697,869 667,449 733,359 736,739 726,599 751,949 758,709 729,979 719,839 687,729

MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO


3.12 450.3 P ASFÁLTICO)
M3 ### 681,837 651,417 717,327 720,707 710,567 735,917 742,677 713,947 703,807 671,697

3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### 414,698 404,127 416,230 431,444 435,843 453,942 456,005 438,067 422,966 421,710
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 295,041 295,041 295,041 333,708 295,041 295,041 333,708 333,708 333,708 316,132
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 288,010 288,010 288,010 326,677 288,010 288,010 326,677 326,677 326,677 309,101
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 39,099 39,099 39,099 39,099 39,099 39,099 39,099 39,099 39,099 39,099

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 173,018 173,018 173,018 173,018 173,018 173,018 173,018 173,018 173,018 173,018
3.15 311.1 AFIRMADO M3 ### 77,494 73,979 72,221 75,737 102,101 107,373 107,373 105,616 77,494 91,555
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,687 11,951 12,016 11,990 11,964 12,135 12,240 11,977 11,858 12,095
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,676 4,808 4,841 4,828 4,815 4,900 4,953 4,821 4,762 4,880
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 636,971 654,478 658,855 657,103 655,353 666,732 673,735 656,228 648,350 664,106

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE


3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 668,758 687,049 691,622 689,792 687,963 699,852 707,168 688,878 680,646 697,108

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE


3.20 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 689,849 708,649 713,349 711,468 709,588 721,808 729,328 710,529 702,068 718,988

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE


3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,325 7,325 7,325 7,325 7,325 7,325 7,325 7,325 7,325 7,325
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 105,903 107,390 110,365 105,903 108,877 143,083 98,467 105,903 105,903 126,724

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 922,276 942,134 947,099 945,113 943,127 956,035 963,978 944,120 935,183 953,056
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 790,096 809,624 814,508 812,553 810,601 823,295 831,106 811,578 802,789 820,366
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 837,860 858,161 863,238 861,206 859,177 872,373 880,494 860,192 851,055 869,328
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 567,411 585,465 589,980 588,173 586,367 598,103 605,326 587,271 579,146 595,396
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 667,438 686,208 690,902 689,023 687,146 699,347 706,855 688,086 679,638 696,532
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 565,534 584,200 588,866 586,998 585,132 597,265 604,731 586,066 577,666 594,465
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 665,487 684,893 689,744 687,802 685,862 698,475 706,237 686,833 678,100 695,565
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 731,105 749,771 754,437 752,569 750,703 762,836 770,302 751,637 743,237 760,036
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 584,844 604,249 609,100 607,159 605,218 617,832 625,593 606,189 597,457 614,921
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 776,532 795,937 800,788 798,847 796,906 809,520 817,282 797,878 789,145 806,610
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P ACERO A-36
KG ### 12,277 12,277 12,277 12,277 12,277 12,277 12,277 12,277 12,277 12,277

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE


4.12 650 P ACERO A-588 GRADO B KG ### 15,675 15,675 15,675 15,675 15,675 15,675 15,675 15,675 15,675 15,675
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,842 1,842 1,842 1,842 1,842 1,842 1,842 1,842 1,842 1,842
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,736,165 2,736,165 2,736,165 2,736,165 2,736,165 2,736,165 2,736,165 2,736,165 2,736,165 2,736,165

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN


4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,232,341 4,266,309 4,274,802 4,271,403 4,268,007 4,290,086 4,303,673 4,269,706 4,254,419 4,284,991
REFUERZO Y ANILLOS)

BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE


4.16 621.2 REFUERZO)
M3 ### 1,754,542 1,773,023 1,777,643 1,775,794 1,773,946 1,785,959 1,793,351 1,774,871 1,766,554 1,783,187

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###


U(DM3) 88,851 88,851 88,851 88,851 88,851 88,851 88,851 88,851 88,851 88,851
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 367,900 370,118 370,672 370,450 370,229 371,670 372,557 370,340 369,342 371,338
4.19 632 P BARANDA METÁLICA ML ### 434,157 434,157 434,157 434,157 434,157 434,157 434,157 434,157 434,157 434,157
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ###
p 17,300 17,300 17,300 17,300 17,300 17,300 17,300 17,300 17,300 17,300
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### i 477,318 494,532 498,296 498,519 512,806 528,647 536,397 515,938 489,913 516,005
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### o 110,354 114,816 114,816 110,354 113,329 147,534 110,354 110,354 110,354 125,226
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 78,424 75,180 73,557 76,802 101,138 106,005 106,005 104,383 78,424 91,404
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 371,466 391,006 395,892 393,937 391,983 404,684 412,502 392,960 384,166 401,753
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 368,203 380,352 384,336 381,552 381,473 401,457 389,877 380,972 375,748 393,767
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 376,874 389,023 393,007 390,223 390,144 410,128 398,548 389,643 384,419 402,438
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 382,288 394,116 398,020 395,268 395,221 414,997 403,288 394,704 389,624 407,355
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 390,959 402,787 406,691 403,939 403,892 423,668 411,959 403,375 398,295 416,026
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 513,259 532,260 537,011 535,110 533,210 545,561 553,161 534,160 525,610 542,711
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 611,370 631,123 636,062 634,085 632,110 644,951 652,852 633,098 624,209 641,988
4.31 681.1 GAVIÓN M3 ### 196,265 197,684 200,524 196,265 199,104 231,755 189,167 196,265 196,265 216,139
4.32 681.1 GAVIÓN MALLA PVC M3 ### 200,470 201,889 204,729 200,470 203,309 235,960 193,372 200,470 200,470 220,344
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500
4.33 672.1 PSI ML ### 42,656 43,822 44,114 43,997 43,881 44,639 45,105 43,939 43,414 44,464
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,
4.34 672.1 2500 PSI
ML ### 16,176 16,759 16,905 16,847 16,789 17,168 17,401 16,818 16,555 17,080
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
4.35 *** (RESISTENCIA ÚLTIMA 25 KN)
M2 ### 10,337 10,337 10,337 10,337 10,337 10,337 10,337 10,337 10,337 10,337

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,677 14,677 14,677 14,677 14,677 14,677 14,677 14,677 14,677 14,677
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,703 19,703 19,703 19,703 19,703 19,703 19,703 19,703 19,703 19,703
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 23,592 23,592 23,592 23,592 23,592 23,592 23,592 23,592 23,592 23,592

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 30,274 30,274 30,274 30,274 30,274 30,274 30,274 30,274 30,274 30,274

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,


4.40 *** FILTRO Y SEPARACIÓN) M2 ### 7,418 7,418 7,418 7,418 7,418 7,418 7,418 7,418 7,418 7,418

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,


4.41 *** FILTRO Y SEPARACIÓN)
M2 ### 8,438 8,438 8,438 8,438 8,438 8,438 8,438 8,438 8,438 8,438

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN,


4.42 *** FILTRO Y SEPARACIÓN)
M2 ### 8,767 8,767 8,767 8,767 8,767 8,767 8,767 8,767 8,767 8,767
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,
4.43 *** FILTRO Y SEPARACIÓN)
M2 ### 6,275 6,275 6,275 6,275 6,275 6,275 6,275 6,275 6,275 6,275
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,
4.44 *** FILTRO Y SEPARACIÓN)
M2 ### 9,399 9,399 9,399 9,399 9,399 9,399 9,399 9,399 9,399 9,399
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,
4.45 *** FILTRO Y SEPARACIÓN) M2 ### 7,683 7,683 7,683 7,683 7,683 7,683 7,683 7,683 7,683 7,683
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN,
4.46 *** FILTRO Y SEPARACIÓN)
M2 ### 9,399 9,399 9,399 9,399 9,399 9,399 9,399 9,399 9,399 9,399

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN,


4.47 *** FILTRO Y SEPARACIÓN)
M2 ### 17,965 17,965 17,965 17,965 17,965 17,965 17,965 17,965 17,965 17,965

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO


4.48 661.1 Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### 639,952 640,202 640,264 640,239 640,214 640,377 640,477 640,227 640,114 640,339
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO
4.49 660.3 600 MM
ML ### 362,578 366,770 367,818 367,399 366,979 369,704 371,381 367,189 365,303 369,075
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,
4.50 *** DIÁMETRO 36"
ML ### 894,464 894,464 894,464 894,464 894,464 894,464 894,464 894,464 894,464 894,464
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 148,501 145,121 143,431 146,811 172,161 177,231 177,231 175,541 148,501 162,021
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,503 4,503 4,503 4,503 4,503 4,503 4,503 4,503 4,503 4,503
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4.53 *** INSTALACIÓN)
ML ### 86,976 86,976 86,976 86,976 86,976 86,976 86,976 86,976 86,976 86,976
GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4.54 *** INSTALACIÓN)
ML ### 132,473 132,473 132,473 132,473 132,473 132,473 132,473 132,473 132,473 132,473
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 518,319 538,073 543,012 541,035 539,060 551,900 559,802 540,048 531,159 548,937
4.56 682.1 P COLCHONETA RENO M3 ### 212,925 214,345 217,184 212,925 215,764 248,415 205,827 212,925 212,925 232,800
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u ORIENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Cáqueza Chipaque Choachí Fómeque Fosca Guayabetal Gutíerrez Quetame Ubaque Une
i
4.57 *** TRINCHO EN MADERA M2 ###
p 68,911 68,911 68,911 68,911 68,911 68,911 68,911 68,911 68,911 68,911
i
5 NORMA INV SEÑALIZACIÓN o
5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,089 4,089 4,089 4,089 4,089 4,089 4,089 4,089 4,089 4,089
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,214 44,214 44,214 44,214 44,214 44,214 44,214 44,214 44,214 44,214
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 84,866 84,866 84,866 84,866 84,866 84,866 84,866 84,866 84,866 84,866
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 70,650 70,650 70,650 70,650 70,650 70,650 70,650 70,650 70,650 70,650
5.5 730.1 DEFENSA METÁLICA ML ### 149,459 150,358 150,582 150,493 150,403 150,987 151,346 150,448 150,043 150,852
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,779 13,779 13,779 13,779 13,779 13,779 13,779 13,779 13,779 13,779

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 858 858 858 858 858 858 858 858 858 858
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36",
6.2 801.6 INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847
DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE


6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067

6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE


6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,277 15,277 15,277 15,277 15,277 15,277 15,277 15,277 15,277 15,277
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,676 24,676 24,676 24,676 24,676 24,676 24,676 24,676 24,676 24,676
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,418 9,418 9,418 9,418 9,418 9,418 9,418 9,418 9,418 9,418

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,304,567 2,342,404 2,266,729 2,331,194 2,310,172 2,326,989 2,305,969 2,376,038
1.2 CAMPAMENTO 9 M2 UN ### 1,333,831 1,352,750 1,314,912 1,347,145 1,336,634 1,345,042 1,334,532 1,369,567
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 15,540 15,540 15,540 15,540 15,540 15,540 15,540 15,540
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 17,426 17,426 17,426 17,426 17,426 17,426 17,426 17,426
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 20,124 20,124 20,124 20,124 20,124 20,124 20,124 20,124
1.6 CERCA EN TABLA H=2.30 M ML ### 73,977 73,977 73,977 73,977 73,977 73,977 73,977 73,977
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 52,603 53,011 52,195 52,890 52,663 52,845 52,618 53,373
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 24,599 25,006 24,191 24,885 24,659 24,840 24,614 25,369
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 1,026,089 1,029,435 1,023,033 1,029,239 1,025,681 1,029,798 1,026,439 1,033,357
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 11,557 11,557 11,557 11,557 11,557 11,557 11,557 11,557
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 4,227 4,227 4,227 4,227 4,227 4,227 4,227 4,227
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 3,041,552 3,041,552 3,041,552 3,041,552 3,041,552 3,041,552 3,041,552 3,041,552
1.44 RED TELEFÓNICA PROVISIONAL UN ### 279,562 279,562 279,562 279,562 279,562 279,562 279,562 279,562
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 158,922 173,427 151,891 148,376 134,315 162,437 143,103 139,588
2.2 BASE ARENA CEMENTO 1:20 M3 ### 251,796 280,052 223,541 271,680 255,982 268,540 252,843 305,168
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ###
p 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### i 24,952 24,952 24,952 24,952 24,952 24,952 24,952 24,952
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### o 782,143 822,255 742,031 810,371 788,085 805,913 783,629 857,910
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 785,904 827,323 744,484 815,051 792,039 810,448 787,438 864,141
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 730,964 769,748 692,181 758,257 736,710 753,947 732,401 804,223
2.9 PILOTE DE MADERA D=20 CM ML ### 52,088 52,088 52,088 52,088 52,088 52,088 52,088 52,088
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.10 MENOR DE 5 KM)
ML ### 161,017 161,017 161,017 161,017 161,017 161,017 161,017 161,017

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA


2.11 MENOR DE 5 KM)
ML ### 204,072 204,072 204,072 204,072 204,072 204,072 204,072 204,072

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA


2.12 MENOR DE 5 KM)
ML ### 256,138 256,138 256,138 256,138 256,138 256,138 256,138 256,138

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA


2.13 MENOR DE 5 KM)
ML ### 326,227 326,227 326,227 326,227 326,227 326,227 326,227 326,227
2.14 PILOTE HINCADO 25X25 ML ### 118,414 121,222 115,605 120,390 118,830 120,078 118,518 123,718
2.15 PILOTE HINCADO 30X30 ML ### 148,325 152,395 144,255 151,189 148,928 150,737 148,475 156,013
2.16 DADOS EN CONCRETO 3500PSI M3 ### 715,966 754,750 677,183 743,259 721,712 738,949 717,403 789,225
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.17 KM)
ML ### 96,671 96,671 96,671 96,671 96,671 96,671 96,671 96,671

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 42,981 43,157 42,806 43,105 43,007 43,085 42,988 43,313
3.2 SIFÓN EN PVC 6" UN ### 224,944 225,120 224,769 225,068 224,970 225,048 224,951 225,276
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 517,660 526,381 511,349 530,398 511,454 537,151 519,859 541,991
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 256,333 260,489 252,382 259,814 256,317 260,004 256,646 264,845
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 296,052 303,026 289,397 301,834 296,091 302,083 296,559 310,266
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 396,189 408,606 384,092 405,802 397,035 405,446 396,898 420,685
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 113,263 113,190 113,365 113,291 113,162 113,392 113,283 113,220
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,456,761 1,456,032 1,457,781 1,457,044 1,455,750 1,458,055 1,456,960 1,456,331
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 130,692 132,632 128,753 132,057 130,980 131,841 130,764 134,355
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 82,908 83,931 81,884 83,628 83,059 83,514 82,946 84,840
3.11 TUBERÍA DRENAJE PVC 110 ML ### 32,476 33,203 31,749 32,987 32,583 32,906 32,503 33,849
3.12 TUBERÍA DRENAJE PVC 160 ML ### 51,824 52,551 51,097 52,336 51,932 52,255 51,851 53,198
3.13 TUBERÍA DRENAJE PVC 200 ML ### 68,277 69,295 67,259 68,993 68,428 68,880 68,315 70,200
3.14 TUBERÍA DRENAJE PVC 250 ML ### 93,278 94,441 92,115 94,097 93,450 93,967 93,321 95,475
3.15 TUBERÍA DRENAJE PVC 315 ML ### 128,297 129,315 127,279 129,013 128,448 128,900 128,335 130,220
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,108,076 1,119,708 1,096,443 1,116,262 1,109,799 1,114,969 1,108,507 1,130,049

3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,582,388 1,605,652 1,559,122 1,598,760 1,585,834 1,596,174 1,583,249 1,626,333

3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 2,094,173 2,140,703 2,047,642 2,126,917 2,101,066 2,121,746 2,095,896 2,182,064

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 47,499 47,499 47,499 47,499 47,499 47,499 47,499 47,499
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 62,937 62,937 62,937 62,937 62,937 62,937 62,937 62,937
4.3 COLUMNAS 3500 PSI M3 ### 956,877 995,661 918,094 984,170 962,623 979,860 958,314 1,030,136
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 321,460 352,369 296,821 339,419 324,801 339,003 320,206 376,593
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO,
4.5 CONCRETO DE 3500 PSI
M2 ### 117,053 120,818 113,287 119,703 117,611 119,284 117,192 124,165

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO,
4.6 CONCRETO DE 3500 PSI
M2 ### 138,380 142,899 133,862 141,560 139,049 141,058 138,548 146,915
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 153,606 159,631 147,582 157,846 154,499 157,176 153,829 164,986
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 162,180 168,581 155,779 166,685 163,128 165,973 162,417 174,271
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 187,081 194,989 179,174 192,646 188,253 191,767 187,374 202,018
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### p 208,620 217,657 199,583 214,979 209,958 213,975 208,954 225,690
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### i 231,778 241,944 221,611 238,932 233,284 237,802 232,154 250,981
4.12 ENTREPISO VIGUETA PLACA M2 ###
o 112,761 113,410 112,112 113,217 112,857 113,145 112,785 113,986
4.13 ESCALERA MACIZA 3500 PSI M3 ### 1,124,415 1,163,199 1,085,631 1,151,708 1,130,160 1,147,397 1,125,852 1,197,674
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 108,470 108,988 107,951 108,834 108,546 108,777 108,489 109,449
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 94,212 98,091 90,334 96,942 94,787 96,511 94,356 101,538
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 106,797 111,541 102,052 110,135 107,499 109,608 106,972 115,758
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 125,276 131,225 119,326 129,462 126,157 128,801 125,496 136,513
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 845,470 884,253 806,686 872,762 851,215 868,452 846,906 918,728
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 55,989 57,177 54,801 56,825 56,165 56,693 56,033 58,233
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 339,331 356,652 322,011 351,521 341,897 349,595 339,973 372,049
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,742 4,742 4,742 4,742 4,742 4,742 4,742 4,742
4.22 ACERO FIGURADO 60000 PSI KG ### 4,973 4,973 4,973 4,973 4,973 4,973 4,973 4,973
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,859 6,859 6,859 6,859 6,859 6,859 6,859 6,859
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 1,003,465 1,042,249 964,682 1,030,758 1,009,211 1,026,448 1,004,902 1,076,724
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 928,147 970,599 885,696 958,022 934,436 953,304 929,720 1,008,335
4.26 VIGA AÉREA 3500 PSI M3 ### 995,735 1,034,519 956,952 1,023,028 1,001,480 1,018,718 997,172 1,068,994
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 974,487 1,013,271 935,703 1,001,780 980,232 997,469 975,924 1,047,746
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,198,382 1,237,166 1,159,598 1,225,675 1,204,127 1,221,364 1,199,819 1,271,641
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 435,022 478,324 391,719 465,495 441,437 460,682 436,626 516,816

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 33,880 34,848 32,913 34,561 34,024 34,454 33,916 35,708
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 55,587 56,554 54,619 56,268 55,730 56,160 55,623 57,414
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 38,644 38,820 38,469 38,768 38,670 38,748 38,651 38,976
5.4 ARCOS EN LADRILLO PRENSADO ML ### 180,412 180,763 180,061 180,659 180,464 180,620 180,425 181,075
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 50,410 51,598 49,222 51,246 50,586 51,114 50,454 52,654
5.6 DINTELES EN BLOQUE 0.15 M ML ### 30,803 31,322 30,285 31,168 30,880 31,110 30,822 31,782
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 112,491 113,193 111,789 112,985 112,595 112,907 112,517 113,817
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 108,179 112,139 104,219 110,966 108,766 110,526 108,326 115,659
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 101,897 101,897 101,897 101,897 101,897 101,897 101,897 101,897
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 59,347 59,347 59,347 59,347 59,347 59,347 59,347 59,347
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 98,031 98,031 98,031 98,031 98,031 98,031 98,031 98,031
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 57,414 57,414 57,414 57,414 57,414 57,414 57,414 57,414
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 114,361 114,361 114,361 114,361 114,361 114,361 114,361 114,361
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 66,980 66,980 66,980 66,980 66,980 66,980 66,980 66,980
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 127,479 127,479 127,479 127,479 127,479 127,479 127,479 127,479
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 73,539 73,539 73,539 73,539 73,539 73,539 73,539 73,539
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 45,744 46,097 45,392 45,993 45,797 45,953 45,757 46,411
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 27,445 27,621 27,268 27,569 27,471 27,549 27,451 27,778
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 59,848 60,083 59,612 60,013 59,882 59,987 59,856 60,292
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 35,626 35,743 35,508 35,709 35,643 35,696 35,630 35,848
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 67,260 67,496 67,025 67,426 67,295 67,400 67,269 67,705
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 40,046 40,164 39,928 40,129 40,063 40,116 40,050 40,268
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 112,517 113,693 111,342 113,345 112,692 113,214 112,561 114,739
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 65,883 66,470 65,295 66,296 65,970 66,231 65,904 66,993
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 41,769 42,005 41,534 41,935 41,804 41,909 41,778 42,214
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 25,104 25,222 24,987 25,187 25,122 25,174 25,109 25,326
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 83,476 83,946 83,005 83,807 83,545 83,754 83,493 84,364
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 49,859 50,094 49,623 50,024 49,894 49,998 49,867 50,303
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 100,185 100,704 99,667 100,550 100,262 100,492 100,204 101,164
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 59,991 60,251 59,732 60,174 60,030 60,145 60,001 60,481
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 207,225 208,871 205,578 208,383 207,468 208,200 207,285 210,334
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ###
p 123,110 123,933 122,287 123,689 123,232 123,598 123,140 124,665
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### i 103,362 104,443 102,281 104,123 103,522 104,003 103,402 105,404
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### o 61,580 62,120 61,040 61,960 61,660 61,900 61,600 62,601
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 53,022 53,548 52,495 53,392 53,100 53,334 53,041 54,016
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 31,915 32,179 31,652 32,101 31,954 32,071 31,925 32,413
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 37,814 38,049 37,579 37,979 37,849 37,953 37,822 38,258
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 22,835 22,953 22,717 22,918 22,852 22,905 22,839 23,057
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 57,766 58,237 57,296 58,097 57,836 58,045 57,784 58,655
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 35,011 35,246 34,776 35,177 35,046 35,150 35,020 35,455
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 111,485 112,190 110,779 111,981 111,589 111,903 111,511 112,818
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 67,136 67,488 66,783 67,384 67,188 67,345 67,149 67,802
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 81,231 81,701 80,760 81,562 81,300 81,509 81,248 82,119
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 48,598 48,833 48,363 48,763 48,633 48,737 48,607 49,042
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 171,907 173,553 170,261 173,066 172,151 172,883 171,968 175,017
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 103,403 104,226 102,580 103,982 103,525 103,891 103,433 104,958
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 35,495 35,670 35,319 35,618 35,521 35,599 35,501 35,826
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 42,176 42,954 41,399 42,724 42,292 42,637 42,205 43,645
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 70,623 71,660 69,586 71,352 70,776 71,237 70,661 72,581
5.50 LAVADA DE FACHADA M2 ### 5,613 5,613 5,613 5,613 5,613 5,613 5,613 5,613
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 55,982 56,949 55,014 56,663 56,125 56,555 56,018 57,809
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,290 11,290 11,290 11,290 11,290 11,290 11,290 11,290
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 15,071 15,071 15,071 15,071 15,071 15,071 15,071 15,071
5.54 ANCLAJE 1/2" L=50CM UN ### 19,738 19,738 19,738 19,738 19,738 19,738 19,738 19,738
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 27,878 27,878 27,878 27,878 27,878 27,878 27,878 27,878
5.56 ANCLAJE 3/4" L=70CM UN ### 41,906 41,906 41,906 41,906 41,906 41,906 41,906 41,906
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,916 6,207 5,625 6,121 5,959 6,088 5,927 6,465

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,404 17,404 17,404 17,404 17,404 17,404 17,404 17,404
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,413 6,588 6,237 6,536 6,439 6,517 6,419 6,744
6.3 FILOS O DILATACIONES S/MURO ML ### 7,670 7,845 7,494 7,793 7,696 7,774 7,676 8,001
6.4 GOTERA EN MORTERO 1:4 ML ### 9,106 9,282 8,931 9,230 9,132 9,210 9,113 9,438
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,630 7,630 7,630 7,630 7,630 7,630 7,630 7,630
6.6 MALLA BAJO ENTRAMADO M2 ### 14,895 14,895 14,895 14,895 14,895 14,895 14,895 14,895
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 27,829 28,585 27,072 28,361 27,941 28,277 27,857 29,258
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 16,664 17,042 16,286 16,930 16,720 16,888 16,678 17,379
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 23,530 24,024 23,036 23,878 23,603 23,823 23,548 24,463
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 14,186 14,433 13,939 14,360 14,223 14,332 14,195 14,652
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 23,704 24,461 22,948 24,237 23,816 24,153 23,732 25,133
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 14,273 14,651 13,895 14,539 14,329 14,497 14,287 14,988
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 23,530 24,024 23,036 23,878 23,603 23,823 23,548 24,463
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 14,186 14,433 13,939 14,360 14,223 14,332 14,195 14,652
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 24,797 25,336 24,258 25,176 24,877 25,116 24,817 25,815
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 14,818 15,088 14,549 15,008 14,858 14,978 14,828 15,327
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 19,499 19,875 19,123 19,764 19,555 19,722 19,513 20,210
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,865 12,053 11,676 11,997 11,892 11,976 11,872 12,220
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 19,632 20,208 19,055 20,037 19,717 19,973 19,653 20,720
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,931 12,219 11,643 12,134 11,974 12,102 11,942 12,475
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 24,355 24,849 23,861 24,702 24,428 24,648 24,373 25,288
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 14,577 14,824 14,330 14,751 14,614 14,724 14,586 15,044
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 24,529 25,286 23,772 25,061 24,641 24,977 24,557 25,958
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,664 15,043 14,286 14,930 14,720 14,888 14,678 15,379
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 20,279 20,855 19,702 20,684 20,364 20,620 20,300 21,367
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 12,235 12,524 11,947 12,438 12,278 12,406 12,246 12,780
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ###
p 25,472 26,228 24,715 26,004 25,584 25,920 25,500 26,901
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### i 15,564 15,942 15,186 15,830 15,620 15,788 15,578 16,279
o
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 30,079 30,785 29,374 30,576 30,184 30,497 30,105 31,412
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA
7.2 IMPERMEABLE)
M2 ### 96,615 98,596 94,635 98,009 96,909 97,789 96,689 100,356
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 62,488 62,488 62,488 62,488 62,488 62,488 62,488 62,488
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 24,649 24,649 24,649 24,649 24,649 24,649 24,649 24,649
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 38,801 38,801 38,801 38,801 38,801 38,801 38,801 38,801
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 91,524 91,524 91,524 91,524 91,524 91,524 91,524 91,524
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 71,514 71,514 71,514 71,514 71,514 71,514 71,514 71,514
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 41,296 41,296 41,296 41,296 41,296 41,296 41,296 41,296
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 95,953 95,953 95,953 95,953 95,953 95,953 95,953 95,953
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 114,715 114,715 114,715 114,715 114,715 114,715 114,715 114,715
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 168,919 168,919 168,919 168,919 168,919 168,919 168,919 168,919
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 66,196 66,196 66,196 66,196 66,196 66,196 66,196 66,196
7.13 CANAL PVC AMAZONAS ML ### 91,686 91,686 91,686 91,686 91,686 91,686 91,686 91,686
7.14 CANAL PVC RAINGO ML ### 83,225 83,225 83,225 83,225 83,225 83,225 83,225 83,225
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 148,982 148,982 148,982 148,982 148,982 148,982 148,982 148,982
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 87,180 87,180 87,180 87,180 87,180 87,180 87,180 87,180
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 63,891 63,891 63,891 63,891 63,891 63,891 63,891 63,891
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 35,811 35,811 35,811 35,811 35,811 35,811 35,811 35,811
7.19000000000001 TEJA DE BARRO M2 ### 66,641 67,519 65,764 67,259 66,771 67,161 66,674 68,299
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 53,281 53,281 53,281 53,281 53,281 53,281 53,281 53,281
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 48,808 48,808 48,808 48,808 48,808 48,808 48,808 48,808
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 40,751 40,751 40,751 40,751 40,751 40,751 40,751 40,751
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 39,937 39,937 39,937 39,937 39,937 39,937 39,937 39,937
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 40,244 40,244 40,244 40,244 40,244 40,244 40,244 40,244
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 56,993 56,993 56,993 56,993 56,993 56,993 56,993 56,993
7.26 TEJA PLÁSTICA No.6 M2 ### 50,023 50,023 50,023 50,023 50,023 50,023 50,023 50,023
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 92,025 92,025 92,025 92,025 92,025 92,025 92,025 92,025
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 170,527 170,527 170,527 170,527 170,527 170,527 170,527 170,527
7.29000000000001 TEJA SIN TRASLAPO M2 ### 76,435 76,435 76,435 76,435 76,435 76,435 76,435 76,435
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 46,905 46,905 46,905 46,905 46,905 46,905 46,905 46,905
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 36,916 36,916 36,916 36,916 36,916 36,916 36,916 36,916
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO
7.32 4"x2", 15 MM)
M2 ### 65,076 65,076 65,076 65,076 65,076 65,076 65,076 65,076
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 22,002 22,002 22,002 22,002 22,002 22,002 22,002 22,002
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 26,614 26,614 26,614 26,614 26,614 26,614 26,614 26,614
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 28,946 28,946 28,946 28,946 28,946 28,946 28,946 28,946
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 37,461 37,461 37,461 37,461 37,461 37,461 37,461 37,461
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 24,552 24,552 24,552 24,552 24,552 24,552 24,552 24,552
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 57,900 57,900 57,900 57,900 57,900 57,900 57,900 57,900
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 405,379 405,379 405,379 405,379 405,379 405,379 405,379 405,379
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 448,220 448,220 448,220 448,220 448,220 448,220 448,220 448,220
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 305,394 305,394 305,394 305,394 305,394 305,394 305,394 305,394
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 327,051 327,051 327,051 327,051 327,051 327,051 327,051 327,051

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 580,467 621,168 539,766 609,109 586,497 604,586 581,975 657,347
8.2 CONCRETO 3500 PSI M3 ### 510,820 548,474 473,166 537,318 516,398 533,133 512,215 581,945
8.3 CONCRETO 3000 PSI M3 ### 510,274 549,217 471,330 537,679 516,043 533,351 511,716 583,834
8.4 CONCRETO 2500 PSI M3 ### 460,889 500,490 421,288 488,757 466,756 484,356 462,356 535,691
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
8.5 CONCRETO 2000 PSI M3 ###
p 436,969 477,727 396,211 465,651 443,007 461,122 438,479 513,957
8.6 CONCRETO 1500 PSI M3 ### i 406,334 448,375 364,292 435,919 412,562 431,247 407,891 485,746
8.7 MORTERO SECO 1:10 M3 ### o 295,348 319,567 271,129 312,391 298,936 309,700 296,245 341,095
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 531,265 554,782 507,748 547,814 534,749 545,201 532,136 575,686
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 539,557 575,586 503,528 564,910 544,894 560,907 540,891 607,611
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 604,608 638,304 570,912 628,320 609,600 624,576 605,856 668,256
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 862,388 896,084 828,692 886,100 867,380 882,356 863,636 926,036

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 138,379 138,379 138,379 138,379 138,379 138,379 138,379 138,379
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,606 4,781 4,430 4,729 4,632 4,710 4,612 4,937
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 154,283 154,283 154,283 154,283 154,283 154,283 154,283 154,283
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 189,572 189,572 189,572 189,572 189,572 189,572 189,572 189,572
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 277,982 277,982 277,982 277,982 277,982 277,982 277,982 277,982
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 309,550 309,550 309,550 309,550 309,550 309,550 309,550 309,550
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 341,152 341,152 341,152 341,152 341,152 341,152 341,152 341,152
9.8 HOJA PUERTA FORTEC 0.81 UN ### 226,911 226,911 226,911 226,911 226,911 226,911 226,911 226,911
9.9 HOJA PUERTA FORTEC 0.91 UN ### 257,354 257,354 257,354 257,354 257,354 257,354 257,354 257,354
9.10 HOJA PUERTA FORTEC 1.50 UN ### 379,124 379,124 379,124 379,124 379,124 379,124 379,124 379,124
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 143,194 143,194 143,194 143,194 143,194 143,194 143,194 143,194
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 190,380 190,380 190,380 190,380 190,380 190,380 190,380 190,380
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 211,690 211,690 211,690 211,690 211,690 211,690 211,690 211,690
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 540,469 540,469 540,469 540,469 540,469 540,469 540,469 540,469
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 47,090 47,090 47,090 47,090 47,090 47,090 47,090 47,090
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 28,996 28,996 28,996 28,996 28,996 28,996 28,996 28,996
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 111,274 111,274 111,274 111,274 111,274 111,274 111,274 111,274
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 138,041 138,041 138,041 138,041 138,041 138,041 138,041 138,041
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 107,142 107,142 107,142 107,142 107,142 107,142 107,142 107,142
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 32,923 32,923 32,923 32,923 32,923 32,923 32,923 32,923
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 32,923 32,923 32,923 32,923 32,923 32,923 32,923 32,923
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 31,188 31,188 31,188 31,188 31,188 31,188 31,188 31,188
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 47,583 47,583 47,583 47,583 47,583 47,583 47,583 47,583
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 59,113 59,113 59,113 59,113 59,113 59,113 59,113 59,113
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 71,412 71,412 71,412 71,412 71,412 71,412 71,412 71,412
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 86,016 86,016 86,016 86,016 86,016 86,016 86,016 86,016
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 407,433 407,433 407,433 407,433 407,433 407,433 407,433 407,433
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 284,446 284,446 284,446 284,446 284,446 284,446 284,446 284,446
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 37,590 37,590 37,590 37,590 37,590 37,590 37,590 37,590
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 48,351 48,351 48,351 48,351 48,351 48,351 48,351 48,351
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 59,113 59,113 59,113 59,113 59,113 59,113 59,113 59,113
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 74,486 74,486 74,486 74,486 74,486 74,486 74,486 74,486

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 85,304 85,304 85,304 85,304 85,304 85,304 85,304 85,304
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 239,899 239,899 239,899 239,899 239,899 239,899 239,899 239,899
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 89,913 89,913 89,913 89,913 89,913 89,913 89,913 89,913
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 159,541 159,541 159,541 159,541 159,541 159,541 159,541 159,541
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 152,798 152,798 152,798 152,798 152,798 152,798 152,798 152,798
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 100,291 100,291 100,291 100,291 100,291 100,291 100,291 100,291
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 237,105 237,105 237,105 237,105 237,105 237,105 237,105 237,105
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 123,081 123,081 123,081 123,081 123,081 123,081 123,081 123,081
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 7,358 7,358 7,358 7,358 7,358 7,358 7,358 7,358
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO p
10.10 ESTRUCTURAL GALVANIZADO 2") M2 ### 109,715 109,715 109,715 109,715 109,715 109,715 109,715 109,715
i
o
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 136,102 136,102 136,102 136,102 136,102 136,102 136,102 136,102
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 45,217 45,217 45,217 45,217 45,217 45,217 45,217 45,217
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 612,773 612,773 612,773 612,773 612,773 612,773 612,773 612,773
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 219,505 219,505 219,505 219,505 219,505 219,505 219,505 219,505
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 244,727 244,727 244,727 244,727 244,727 244,727 244,727 244,727
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
10.15 ACCESORIOS) M2 ### 557,734 557,734 557,734 557,734 557,734 557,734 557,734 557,734
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 142,142 142,142 142,142 142,142 142,142 142,142 142,142 142,142
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 447,353 447,353 447,353 447,353 447,353 447,353 447,353 447,353
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,734 6,734 6,734 6,734 6,734 6,734 6,734 6,734
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 313,552 313,552 313,552 313,552 313,552 313,552 313,552 313,552
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 135,639 135,639 135,639 135,639 135,639 135,639 135,639 135,639
10.21 REJILLA PISO 0.30 M M2 ### 96,807 96,807 96,807 96,807 96,807 96,807 96,807 96,807
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 99,694 99,694 99,694 99,694 99,694 99,694 99,694 99,694

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,


10.23 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 11,617 11,617 11,617 11,617 11,617 11,617 11,617 11,617
PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS,


10.24 CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, KG ### 12,936 12,936 12,936 12,936 12,936 12,936 12,936 12,936
PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10.25 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, KG ### 10,196 10,196 10,196 10,196 10,196 10,196 10,196 10,196
SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 244,849 244,849 244,849 244,849 244,849 244,849 244,849 244,849
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 296,788 296,788 296,788 296,788 296,788 296,788 296,788 296,788
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 24,649 24,649 24,649 24,649 24,649 24,649 24,649 24,649
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 38,801 38,801 38,801 38,801 38,801 38,801 38,801 38,801
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 37,057 37,057 37,057 37,057 37,057 37,057 37,057 37,057
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 47,667 47,667 47,667 47,667 47,667 47,667 47,667 47,667
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 98,716 98,716 98,716 98,716 98,716 98,716 98,716 98,716
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 246,402 246,402 246,402 246,402 246,402 246,402 246,402 246,402
11.9 INSTALACIÓN APARATO SANITARIO UN ### 47,038 47,038 47,038 47,038 47,038 47,038 47,038 47,038
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 38,766 38,766 38,766 38,766 38,766 38,766 38,766 38,766
11.13 NIPLE PASAMURO 2" UN ### 73,130 73,130 73,130 73,130 73,130 73,130 73,130 73,130
11.14 NIPLE PASAMURO 4" UN ### 109,473 109,473 109,473 109,473 109,473 109,473 109,473 109,473
11.15 PUNTO AGUA CALIENTE CPVC UN ### 92,989 92,989 92,989 92,989 92,989 92,989 92,989 92,989
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 67,051 67,051 67,051 67,051 67,051 67,051 67,051 67,051
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 71,506 71,506 71,506 71,506 71,506 71,506 71,506 71,506
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 90,399 90,399 90,399 90,399 90,399 90,399 90,399 90,399
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 73,362 73,362 73,362 73,362 73,362 73,362 73,362 73,362
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 92,378 92,378 92,378 92,378 92,378 92,378 92,378 92,378
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 98,968 98,968 98,968 98,968 98,968 98,968 98,968 98,968
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 82,697 82,697 82,697 82,697 82,697 82,697 82,697 82,697
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,950 13,950 13,950 13,950 13,950 13,950 13,950 13,950
11.24 RED SUMINISTRO CPVC 3/4" ML ### 19,754 19,754 19,754 19,754 19,754 19,754 19,754 19,754
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
11.25 RED SUMINISTRO PVC 1 1/2" ML ###
p 25,768 25,768 25,768 25,768 25,768 25,768 25,768 25,768
11.26 RED SUMINISTRO PVC 1" ML ### i 15,846 15,846 15,846 15,846 15,846 15,846 15,846 15,846
11.27 RED SUMINISTRO PVC 1/2" ML ### o 9,419 9,419 9,419 9,419 9,419 9,419 9,419 9,419
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 57,681 57,681 57,681 57,681 57,681 57,681 57,681 57,681
11.29 RED SUMINISTRO PVC 2" ML ### 36,805 36,805 36,805 36,805 36,805 36,805 36,805 36,805
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,828 11,828 11,828 11,828 11,828 11,828 11,828 11,828
11.31 RED SANITARIA PVC-S 2" ML ### 28,324 28,324 28,324 28,324 28,324 28,324 28,324 28,324
11.32 RED SANITARIA PVC-S 3" ML ### 39,383 39,383 39,383 39,383 39,383 39,383 39,383 39,383
11.33 RED SANITARIA PVC-S 4" ML ### 53,505 53,505 53,505 53,505 53,505 53,505 53,505 53,505
11.34 RED SANITARIA PVC-S 6" ML ### 100,623 100,623 100,623 100,623 100,623 100,623 100,623 100,623
11.35 REGISTRO 1" UN ### 121,652 121,652 121,652 121,652 121,652 121,652 121,652 121,652
11.36 REGISTRO 1/2" UN ### 67,724 67,724 67,724 67,724 67,724 67,724 67,724 67,724
11.37 REGISTRO 3/4" UN ### 86,476 86,476 86,476 86,476 86,476 86,476 86,476 86,476
11.38 REGISTRO 1 1/2" UN ### 209,630 209,630 209,630 209,630 209,630 209,630 209,630 209,630
11.39 REGISTRO 2 1/2" UN ### 433,467 433,467 433,467 433,467 433,467 433,467 433,467 433,467
11.40 REGISTRO 2" UN ### 319,789 319,789 319,789 319,789 319,789 319,789 319,789 319,789
11.41 REVENTILACIÓN 2" ML ### 19,684 19,684 19,684 19,684 19,684 19,684 19,684 19,684
11.42 REVENTILACIÓN 3" ML ### 24,865 24,865 24,865 24,865 24,865 24,865 24,865 24,865
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 193,547 193,547 193,547 193,547 193,547 193,547 193,547 193,547
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 316,107 316,107 316,107 316,107 316,107 316,107 316,107 316,107
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 526,825 526,825 526,825 526,825 526,825 526,825 526,825 526,825
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 45,422 45,422 45,422 45,422 45,422 45,422 45,422 45,422

11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 53,631 53,631 53,631 53,631 53,631 53,631 53,631 53,631

11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 68,281 68,281 68,281 68,281 68,281 68,281 68,281 68,281

11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 78,035 78,035 78,035 78,035 78,035 78,035 78,035 78,035

11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 100,675 100,675 100,675 100,675 100,675 100,675 100,675 100,675

11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 115,519 115,519 115,519 115,519 115,519 115,519 115,519 115,519

11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 170,336 170,336 170,336 170,336 170,336 170,336 170,336 170,336
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 68,486 68,486 68,486 68,486 68,486 68,486 68,486 68,486
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 68,774 68,774 68,774 68,774 68,774 68,774 68,774 68,774
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 44,620 44,620 44,620 44,620 44,620 44,620 44,620 44,620
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 55,214 55,214 55,214 55,214 55,214 55,214 55,214 55,214
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,696 4,696 4,696 4,696 4,696 4,696 4,696 4,696
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 7,437 7,437 7,437 7,437 7,437 7,437 7,437 7,437
11.59 GABINETE TIPO III UN ### 1,145,453 1,145,453 1,145,453 1,145,453 1,145,453 1,145,453 1,145,453 1,145,453
11.60 GABINETE TIPO I UN ### 871,775 871,775 871,775 871,775 871,775 871,775 871,775 871,775
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,968,390 2,968,390 2,968,390 2,968,390 2,968,390 2,968,390 2,968,390 2,968,390
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,473,298 2,473,298 2,473,298 2,473,298 2,473,298 2,473,298 2,473,298 2,473,298
11.63 VÁLVULA MARIPOSA 3" UN ### 710,975 710,975 710,975 710,975 710,975 710,975 710,975 710,975
11.64 VÁLVULA MARIPOSA 4" UN ### 922,855 922,855 922,855 922,855 922,855 922,855 922,855 922,855
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 358,209 358,209 358,209 358,209 358,209 358,209 358,209 358,209

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 410,726 410,726 410,726 410,726 410,726 410,726 410,726 410,726
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 65,274 65,274 65,274 65,274 65,274 65,274 65,274 65,274
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 77,395 77,395 77,395 77,395 77,395 77,395 77,395 77,395
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 85,777 85,777 85,777 85,777 85,777 85,777 85,777 85,777
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 101,188 101,188 101,188 101,188 101,188 101,188 101,188 101,188
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 61,293 61,293 61,293 61,293 61,293 61,293 61,293 61,293
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
12.7 SALIDA TIMBRE PVC COMPLETA UN ###
p 69,920 69,920 69,920 69,920 69,920 69,920 69,920 69,920
12.8 STRIP TELEFÓNICO 10 PARES UN ### i 160,629 160,629 160,629 160,629 160,629 160,629 160,629 160,629
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### o 62,991 62,991 62,991 62,991 62,991 62,991 62,991 62,991
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 144,939 144,939 144,939 144,939 144,939 144,939 144,939 144,939
12.11 SALIDA T.V PVC COMPLETA. UN ### 86,525 86,525 86,525 86,525 86,525 86,525 86,525 86,525
12.12 SALIDA BIFÁSICA C.N. UN ### 51,336 51,336 51,336 51,336 51,336 51,336 51,336 51,336
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 107,841 107,841 107,841 107,841 107,841 107,841 107,841 107,841
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 460,095 460,095 460,095 460,095 460,095 460,095 460,095 460,095
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 613,601 613,601 613,601 613,601 613,601 613,601 613,601 613,601
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,975 3,975 3,975 3,975 3,975 3,975 3,975 3,975
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 5,245 5,245 5,245 5,245 5,245 5,245 5,245 5,245
12.18 TUBERÍA PVC CONDUIT 1" ML ### 8,175 8,175 8,175 8,175 8,175 8,175 8,175 8,175
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 14,610 14,610 14,610 14,610 14,610 14,610 14,610 14,610
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 307,378 307,378 307,378 307,378 307,378 307,378 307,378 307,378
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 86,587 86,587 86,587 86,587 86,587 86,587 86,587 86,587
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 117,666 117,666 117,666 117,666 117,666 117,666 117,666 117,666
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 47,268 47,268 47,268 47,268 47,268 47,268 47,268 47,268
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,567,822 1,567,822 1,567,822 1,567,822 1,567,822 1,567,822 1,567,822 1,567,822
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,161,101 1,161,101 1,161,101 1,161,101 1,161,101 1,161,101 1,161,101 1,161,101
12.26 POSTE METÁLICO 6M UN ### 1,465,513 1,465,513 1,465,513 1,465,513 1,465,513 1,465,513 1,465,513 1,465,513
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 685,012 685,012 685,012 685,012 685,012 685,012 685,012 685,012
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 124,087 124,087 124,087 124,087 124,087 124,087 124,087 124,087
12.29 LUMINARIA 70W SODIO UN ### 575,023 575,023 575,023 575,023 575,023 575,023 575,023 575,023
12.30 LUMINARIA 150W SODIO UN ### 719,816 719,816 719,816 719,816 719,816 719,816 719,816 719,816
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,903,838 1,903,838 1,903,838 1,903,838 1,903,838 1,903,838 1,903,838 1,903,838
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,401,538 1,401,538 1,401,538 1,401,538 1,401,538 1,401,538 1,401,538 1,401,538

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 46,868 48,164 45,572 47,780 47,060 47,636 46,916 49,316
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 46,939 48,235 45,643 47,851 47,131 47,707 46,987 49,387
13.3 ALISTADO PARA LISTÓN M2 ### 16,663 16,922 16,403 16,845 16,701 16,816 16,672 17,152
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 36,590 39,182 33,998 38,414 36,974 38,126 36,686 41,486
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 101,465 104,057 98,873 103,289 101,849 103,001 101,561 106,361
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 30,345 31,161 29,530 30,919 30,466 30,828 30,376 31,885
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 70,382 74,342 66,421 73,168 70,968 72,728 70,528 77,862
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 99,432 105,768 93,096 103,891 100,371 103,187 99,667 111,401
13.9 MANTO FIBERGLASS 600X1 M2 ### 34,183 34,183 34,183 34,183 34,183 34,183 34,183 34,183
13.10 PEGANTE MORTERO-CONCRETO M2 ### 25,495 25,495 25,495 25,495 25,495 25,495 25,495 25,495
13.11 PERMA PLY 2 CAPAS M2 ### 29,805 29,805 29,805 29,805 29,805 29,805 29,805 29,805
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 57,967 61,531 54,402 60,475 58,495 60,079 58,099 64,699
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 68,288 72,645 63,932 71,354 68,934 70,870 68,450 76,517
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 99,922 106,654 93,189 104,659 100,919 103,911 100,171 112,638
13.15 TRITURADO FINO 1/2 M3 ### 163,661 193,615 133,707 184,740 168,099 181,411 164,771 220,241
13.16 TRITURADO GRUESO 3/4 M3 ### 155,475 178,149 133,961 174,612 155,220 175,814 157,218 202,091

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 65,242 65,760 64,723 65,607 65,319 65,549 65,261 66,221
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 38,635 38,894 38,376 38,818 38,674 38,789 38,645 39,125
14.3 ADOQUÍN CONCRETO 6CM M2 ### 75,917 77,213 74,621 76,829 76,109 76,685 75,965 78,365
14.4 ADOQUÍN CONCRETO 8CM M2 ### 79,717 81,013 78,421 80,629 79,909 80,485 79,765 82,165
14.5 ADOQUÍN GRES PEATONAL M2 ### 84,537 85,833 83,241 85,449 84,729 85,305 84,585 86,985
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE
14.6 ALISTADO
M2 ### 86,200 86,719 85,682 86,565 86,277 86,507 86,219 87,179
14.7 GRAVILLA PARA GRADAS ML ### 41,089 41,608 40,571 41,454 41,166 41,397 41,109 42,069
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ###
p 190,415 192,747 188,082 192,056 190,760 191,797 190,501 194,821
14.9 ACABADO EN GRAVILLA LAVADA M2 ### i 52,814 54,110 51,518 53,726 53,006 53,582 52,862 55,262
14.10 GUARDAESCOBA EN GRANITO ML ### o 48,327 48,327 48,327 48,327 48,327 48,327 48,327 48,327
14.11 GUARDAESCOBA EN GRAVILLA ML ### 11,969 12,487 11,450 12,333 12,045 12,276 11,988 12,948
14.12 GUARDAESCOBA PVC CARAMELO ML ### 10,686 10,686 10,686 10,686 10,686 10,686 10,686 10,686
14.13 GUARDAESCOBA PVC CEDRO ML ### 14,374 14,374 14,374 14,374 14,374 14,374 14,374 14,374
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,763 11,763 11,763 11,763 11,763 11,763 11,763 11,763
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 19,914 19,914 19,914 19,914 19,914 19,914 19,914 19,914
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 39,092 39,092 39,092 39,092 39,092 39,092 39,092 39,092
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 10,062 10,062 10,062 10,062 10,062 10,062 10,062 10,062
14.18 LISTÓN M.H. AMARILLO M2 ### 83,471 83,471 83,471 83,471 83,471 83,471 83,471 83,471
14.19 PASO ESCALERA GRANITO ML ### 136,115 137,929 134,301 137,392 136,384 137,190 136,182 139,542
14.20 PIRLANES ALUMINIO ML ### 8,164 8,164 8,164 8,164 8,164 8,164 8,164 8,164
14.21 PIRLANES LADRILLO ML ### 35,724 36,075 35,373 35,971 35,776 35,932 35,737 36,387
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 51,999 51,999 51,999 51,999 51,999 51,999 51,999 51,999
14.23 PISO VINILO TRÁFICO PESADO M2 ### 60,577 60,577 60,577 60,577 60,577 60,577 60,577 60,577
14.24 PULIDA LACADA PISO MADERA M2 ### 54,905 54,905 54,905 54,905 54,905 54,905 54,905 54,905
14.25 TABLETA DE GRES 25X25 M2 ### 56,632 57,151 56,114 56,997 56,709 56,940 56,652 57,612
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 63,593 64,112 63,075 63,958 63,670 63,900 63,612 64,572
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 12,044 12,044 12,044 12,044 12,044 12,044 12,044 12,044
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 56,126 56,653 55,600 56,497 56,204 56,438 56,146 57,121
14.29 JABONERA PORCELANA ACUARIO UN ### 23,312 23,312 23,312 23,312 23,312 23,312 23,312 23,312
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y
14.30 PERCHA SIMPLE) UN ### 140,079 140,079 140,079 140,079 140,079 140,079 140,079 140,079
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,934 10,934 10,934 10,934 10,934 10,934 10,934 10,934
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 25,367 25,367 25,367 25,367 25,367 25,367 25,367 25,367
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 16,109 16,109 16,109 16,109 16,109 16,109 16,109 16,109
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 15,637 15,637 15,637 15,637 15,637 15,637 15,637 15,637
14.35 REMATES BOCEL ALUMINIO ML ### 9,351 9,351 9,351 9,351 9,351 9,351 9,351 9,351
14.36 REMATES BOCEL PORCELANA ML ### 9,524 9,524 9,524 9,524 9,524 9,524 9,524 9,524
14.37 TAPA REGISTRO 20X20 UN ### 21,420 21,420 21,420 21,420 21,420 21,420 21,420 21,420
14.38 TAPA REGISTRO 6X6 UN ### 19,480 19,480 19,480 19,480 19,480 19,480 19,480 19,480
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 21,462 21,462 21,462 21,462 21,462 21,462 21,462 21,462
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 24,811 24,811 24,811 24,811 24,811 24,811 24,811 24,811
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 74,920 75,439 74,402 75,285 74,997 75,228 74,940 75,900
14.42 MEDIA CAÑA EN GRANITO ML ### 88,503 88,503 88,503 88,503 88,503 88,503 88,503 88,503
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,994 36,994 36,994 36,994 36,994 36,994 36,994 36,994
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,868 14,868 14,868 14,868 14,868 14,868 14,868 14,868
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 116,750 116,750 116,750 116,750 116,750 116,750 116,750 116,750
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 140,866 140,866 140,866 140,866 140,866 140,866 140,866 140,866

15 CIELO RASO
15.1 APLIQUE YESO ML ### 83,086 83,086 83,086 83,086 83,086 83,086 83,086 83,086
15.2 ARMADURA MADERA Y MALLA M2 ### 39,462 39,462 39,462 39,462 39,462 39,462 39,462 39,462
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 62,077 62,077 62,077 62,077 62,077 62,077 62,077 62,077
15.4 CIELO RASO DURACUSTIC M2 ### 76,524 76,524 76,524 76,524 76,524 76,524 76,524 76,524
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 56,976 56,976 56,976 56,976 56,976 56,976 56,976 56,976
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 106,319 106,319 106,319 106,319 106,319 106,319 106,319 106,319
15.7 CORNISAS YESO ML ### 55,862 55,862 55,862 55,862 55,862 55,862 55,862 55,862
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 117,849 117,849 117,849 117,849 117,849 117,849 117,849 117,849
15.9 MALLA CON VENA M2 ### 14,786 14,786 14,786 14,786 14,786 14,786 14,786 14,786

16 EXCAVACIONES Y RELLENOS
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
16.1 EXPLANACIÓN Y EXTENDIDA M3 ###
p 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
16.2 EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
M3 ### i 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688
UNA DISTANCIA MENOR DE 5 KM) o
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 72,377 61,503 88,881 78,364 55,516 95,225 75,892 66,776
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 158,049 186,561 129,537 178,113 162,273 174,945 159,105 211,905
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 149,495 205,738 161,798 181,132 205,738 172,344 153,010 214,526
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 148,076 162,582 141,046 137,531 123,470 151,592 132,258 128,743
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 132,264 188,507 144,567 163,900 188,507 155,112 135,779 197,295
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 145,929 202,172 158,232 177,566 202,172 168,778 149,444 210,960

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 343,852 343,852 343,852 343,852 343,852 343,852 343,852 343,852
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,018,882 1,018,882 1,018,882 1,018,882 1,018,882 1,018,882 1,018,882 1,018,882
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 550,925 550,925 550,925 550,925 550,925 550,925 550,925 550,925
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 157,362 157,362 157,362 157,362 157,362 157,362 157,362 157,362
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 221,930 221,930 221,930 221,930 221,930 221,930 221,930 221,930
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 205,902 205,902 205,902 205,902 205,902 205,902 205,902 205,902
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 456,705 456,705 456,705 456,705 456,705 456,705 456,705 456,705
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,172,222 1,172,222 1,172,222 1,172,222 1,172,222 1,172,222 1,172,222 1,172,222
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 330,978 330,978 330,978 330,978 330,978 330,978 330,978 330,978
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 233,316 233,316 233,316 233,316 233,316 233,316 233,316 233,316
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 91,243 91,243 91,243 91,243 91,243 91,243 91,243 91,243
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X
17.12 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 283,488 283,488 283,488 283,488 283,488 283,488 283,488 283,488

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120


17.13 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 418,957 418,957 418,957 418,957 418,957 418,957 418,957 418,957

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 9,225 9,225 9,225 9,225 9,225 9,225 9,225 9,225
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,443 3,443 3,443 3,443 3,443 3,443 3,443 3,443
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 12,166 12,166 12,166 12,166 12,166 12,166 12,166 12,166
18.4 BARNIZ SOBRE MUEBLES M2 ### 47,005 47,005 47,005 47,005 47,005 47,005 47,005 47,005
18.5 CARBURO SOBRE PAÑETES M2 ### 6,385 6,385 6,385 6,385 6,385 6,385 6,385 6,385
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 75,010 75,010 75,010 75,010 75,010 75,010 75,010 75,010
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,779 3,779 3,779 3,779 3,779 3,779 3,779 3,779
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 3,079 3,079 3,079 3,079 3,079 3,079 3,079 3,079
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 15,367 15,367 15,367 15,367 15,367 15,367 15,367 15,367
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,469 4,469 4,469 4,469 4,469 4,469 4,469 4,469
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 16,212 16,212 16,212 16,212 16,212 16,212 16,212 16,212
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,456 6,456 6,456 6,456 6,456 6,456 6,456 6,456
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 7,321 7,321 7,321 7,321 7,321 7,321 7,321 7,321
18.14 ESTUCO M2 ### 7,644 7,644 7,644 7,644 7,644 7,644 7,644 7,644
18.15 ESTUCO (LINEAL) ML ### 4,771 4,771 4,771 4,771 4,771 4,771 4,771 4,771
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 17,071 17,071 17,071 17,071 17,071 17,071 17,071 17,071
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,527 10,527 10,527 10,527 10,527 10,527 10,527 10,527
18.18 LACA PISOS MADERA M2 ### 24,811 24,811 24,811 24,811 24,811 24,811 24,811 24,811
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
18.19 LÍNEAS TRÁFICO 0.10 ML ###
p 2,946 2,946 2,946 2,946 2,946 2,946 2,946 2,946
18.20 MARMOLINA SOBRE PAÑETE M2 ### i 13,644 13,644 13,644 13,644 13,644 13,644 13,644 13,644
18.21 TINTILLA SOBRE MADERA LINEAL ML ### o 3,673 3,673 3,673 3,673 3,673 3,673 3,673 3,673
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,909 13,909 13,909 13,909 13,909 13,909 13,909 13,909
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,802 7,802 7,802 7,802 7,802 7,802 7,802 7,802
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,877 4,877 4,877 4,877 4,877 4,877 4,877 4,877
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 24,373 24,373 24,373 24,373 24,373 24,373 24,373 24,373
18.26 PINTURA EPÓXICA M2 ### 13,896 13,896 13,896 13,896 13,896 13,896 13,896 13,896
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,548 8,548 8,548 8,548 8,548 8,548 8,548 8,548

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,956,176 6,956,176 6,956,176 6,956,176 6,956,176 6,956,176 6,956,176 6,956,176
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO
19.2 PARA MOVILIZAR (PAR) UN ### 12,290,409 12,290,409 12,290,409 12,290,409 12,290,409 12,290,409 12,290,409 12,290,409
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 3,216,084 3,216,084 3,216,084 3,216,084 3,216,084 3,216,084 3,216,084 3,216,084
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 10,511,157 10,511,157 10,511,157 10,511,157 10,511,157 10,511,157 10,511,157 10,511,157
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,845,144 9,845,144 9,845,144 9,845,144 9,845,144 9,845,144 9,845,144 9,845,144
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,946 2,946 2,946 2,946 2,946 2,946 2,946 2,946
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 985,245 985,245 985,245 985,245 985,245 985,245 985,245 985,245
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 98,701 98,701 98,701 98,701 98,701 98,701 98,701 98,701
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,786,483 1,786,890 1,786,076 1,786,769 1,786,543 1,786,724 1,786,498 1,787,251
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 779,340 789,075 769,604 786,191 780,782 785,109 779,700 797,730

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 32,498 32,498 32,498 32,498 32,498 32,498 32,498 32,498
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 48,753 48,753 48,753 48,753 48,753 48,753 48,753 48,753
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 60,609 60,609 60,609 60,609 60,609 60,609 60,609 60,609
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 19,431 19,431 19,431 19,431 19,431 19,431 19,431 19,431
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 23,663 23,663 23,663 23,663 23,663 23,663 23,663 23,663
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 32,402 32,402 32,402 32,402 32,402 32,402 32,402 32,402
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 28,238 28,238 28,238 28,238 28,238 28,238 28,238 28,238
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 29,816 29,816 29,816 29,816 29,816 29,816 29,816 29,816
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 37,448 37,448 37,448 37,448 37,448 37,448 37,448 37,448
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 19,978 19,978 19,978 19,978 19,978 19,978 19,978 19,978
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 26,243 26,243 26,243 26,243 26,243 26,243 26,243 26,243
20.12 VÁLVULA DE BOLA GAS 1" UN ### 40,491 40,491 40,491 40,491 40,491 40,491 40,491 40,491
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 311,311 311,311 311,311 311,311 311,311 311,311 311,311 311,311
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 358,515 358,515 358,515 358,515 358,515 358,515 358,515 358,515
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 373,612 373,612 373,612 373,612 373,612 373,612 373,612 373,612
20.16 ACOMETIDA GAS 1/2" ML ### 345,838 345,838 345,838 345,838 345,838 345,838 345,838 345,838

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 252,730 252,730 252,730 252,730 252,730 252,730 252,730 252,730
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 38,911 38,911 38,911 38,911 38,911 38,911 38,911 38,911
21.3 SIRENA DE 110 V UN ### 117,426 117,426 117,426 117,426 117,426 117,426 117,426 117,426
21.4 CÁMARA CCTV UN ### 293,793 293,793 293,793 293,793 293,793 293,793 293,793 293,793
21.5 PARLANTE-CIELO FALSO UN ### 58,352 58,352 58,352 58,352 58,352 58,352 58,352 58,352
21.6 AMPLIFICADOR 100W UN ### 650,980 650,980 650,980 650,980 650,980 650,980 650,980 650,980
21.7 AMPLIFICADOR 300W UN ### 1,623,784 1,623,784 1,623,784 1,623,784 1,623,784 1,623,784 1,623,784 1,623,784
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 48,351 48,351 48,351 48,351 48,351 48,351 48,351 48,351
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 253,364 253,364 253,364 253,364 253,364 253,364 253,364 253,364
21.10 TOMA PARA MICRÓFONO UN ### 48,952 48,952 48,952 48,952 48,952 48,952 48,952 48,952
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 4,250 4,250 4,250 4,250 4,250 4,250 4,250 4,250
21.12 SPLITERS UN ### 7,207 7,207 7,207 7,207 7,207 7,207 7,207 7,207
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ###
p 20,382 20,382 20,382 20,382 20,382 20,382 20,382 20,382
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### i 26,770 26,770 26,770 26,770 26,770 26,770 26,770 26,770
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### o 34,888 34,888 34,888 34,888 34,888 34,888 34,888 34,888
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 139,702 139,702 139,702 139,702 139,702 139,702 139,702 139,702
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 36,424 36,424 36,424 36,424 36,424 36,424 36,424 36,424
21.18 BANDEJA PORTACABLES PARA RACK UN ### 119,597 119,597 119,597 119,597 119,597 119,597 119,597 119,597
21.19 RACK 2' X 24" UN ### 204,237 204,237 204,237 204,237 204,237 204,237 204,237 204,237
21.20 RACK 3' X 24" UN ### 324,485 324,485 324,485 324,485 324,485 324,485 324,485 324,485
21.21 RACK 5' X 24" UN ### 401,490 401,490 401,490 401,490 401,490 401,490 401,490 401,490
21.22 RACK 7' X 24" UN ### 439,543 439,543 439,543 439,543 439,543 439,543 439,543 439,543
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 638,741 638,741 638,741 638,741 638,741 638,741 638,741 638,741
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 374,837 374,837 374,837 374,837 374,837 374,837 374,837 374,837
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 118,349 118,349 118,349 118,349 118,349 118,349 118,349 118,349
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 15,841 15,841 15,841 15,841 15,841 15,841 15,841 15,841
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 32,432 32,432 32,432 32,432 32,432 32,432 32,432 32,432
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,607 5,607 5,607 5,607 5,607 5,607 5,607 5,607
21.29 CANALETA METÁLICA 4X6 CMS ML ### 39,258 39,258 39,258 39,258 39,258 39,258 39,258 39,258
21.30 CANALETA METÁLICA 4X10 CMS ML ### 41,072 41,072 41,072 41,072 41,072 41,072 41,072 41,072
21.31 CANALETA METÁLICA 6X10 CMS ML ### 41,979 41,979 41,979 41,979 41,979 41,979 41,979 41,979
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 27,369 27,369 27,369 27,369 27,369 27,369 27,369 27,369
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 30,353 30,353 30,353 30,353 30,353 30,353 30,353 30,353
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 31,606 31,606 31,606 31,606 31,606 31,606 31,606 31,606
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 53,640 53,640 53,640 53,640 53,640 53,640 53,640 53,640
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 697,405 697,405 697,405 697,405 697,405 697,405 697,405 697,405
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 356,762 356,762 356,762 356,762 356,762 356,762 356,762 356,762
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 98,313 98,313 98,313 98,313 98,313 98,313 98,313 98,313
21.39 CABLE TELEFÓNICO 2 PARES ML ### 2,051 2,051 2,051 2,051 2,051 2,051 2,051 2,051
21.40 CABLE TELEFÓNICO 10 PARES ML ### 9,490 9,490 9,490 9,490 9,490 9,490 9,490 9,490
21.41 CABLE TELEFÓNICO 20 PARES ML ### 14,254 14,254 14,254 14,254 14,254 14,254 14,254 14,254
21.42 CABLE TELEFÓNICO 40 PARES ML ### 23,868 23,868 23,868 23,868 23,868 23,868 23,868 23,868
21.43 CABLE TELEVISIÓN RG6 ML ### 4,388 4,388 4,388 4,388 4,388 4,388 4,388 4,388
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 24,304 24,304 24,304 24,304 24,304 24,304 24,304 24,304
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 35,616 35,616 35,616 35,616 35,616 35,616 35,616 35,616
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 21,421 21,421 21,421 21,421 21,421 21,421 21,421 21,421
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 17,244 17,244 17,244 17,244 17,244 17,244 17,244 17,244
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 707,427 707,427 707,427 707,427 707,427 707,427 707,427 707,427
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
URBANISMO
p
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 30,789 30,789 30,789 30,789 30,789 30,789 30,789 30,789
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 103,459 103,459 103,459 103,459 103,459 103,459 103,459 103,459
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 584,261 584,261 584,261 584,261 584,261 584,261 584,261 584,261
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,247,159 1,247,159 1,247,159 1,247,159 1,247,159 1,247,159 1,247,159 1,247,159
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 142,734 142,734 142,734 142,734 142,734 142,734 142,734 142,734
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 871,248 871,248 871,248 871,248 871,248 871,248 871,248 871,248
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,876,011 1,876,011 1,876,011 1,876,011 1,876,011 1,876,011 1,876,011 1,876,011
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 14,621 14,621 14,621 14,621 14,621 14,621 14,621 14,621
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 18,118 18,118 18,118 18,118 18,118 18,118 18,118 18,118
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 22,841 22,841 22,841 22,841 22,841 22,841 22,841 22,841
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 25,033 25,033 25,033 25,033 25,033 25,033 25,033 25,033
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 30,082 30,082 30,082 30,082 30,082 30,082 30,082 30,082
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 30,082 30,082 30,082 30,082 30,082 30,082 30,082 30,082
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 122,101 122,101 122,101 122,101 122,101 122,101 122,101 122,101
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 141,382 141,382 141,382 141,382 141,382 141,382 141,382 141,382
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 437,747 437,747 437,747 437,747 437,747 437,747 437,747 437,747
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 164,446 164,446 164,446 164,446 164,446 164,446 164,446 164,446
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 271,083 271,083 271,083 271,083 271,083 271,083 271,083 271,083
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,200,635 1,200,635 1,200,635 1,200,635 1,200,635 1,200,635 1,200,635 1,200,635
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,383,442 1,383,442 1,383,442 1,383,442 1,383,442 1,383,442 1,383,442 1,383,442
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 15,979 15,979 15,979 15,979 15,979 15,979 15,979 15,979
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 14,069 14,069 14,069 14,069 14,069 14,069 14,069 14,069
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 35,355 35,355 35,355 35,355 35,355 35,355 35,355 35,355
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 139,533 139,533 139,533 139,533 139,533 139,533 139,533 139,533
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 208,208 208,208 208,208 208,208 208,208 208,208 208,208 208,208
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 33,821 33,821 33,821 33,821 33,821 33,821 33,821 33,821
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 116,835 116,835 116,835 116,835 116,835 116,835 116,835 116,835
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 173,549 173,549 173,549 173,549 173,549 173,549 173,549 173,549
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 34,273 34,273 34,273 34,273 34,273 34,273 34,273 34,273
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 70,771 70,771 70,771 70,771 70,771 70,771 70,771 70,771
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 285,915 285,915 285,915 285,915 285,915 285,915 285,915 285,915
1.32 UNIÓN REPARACION PVC 4" UN ### 82,644 82,644 82,644 82,644 82,644 82,644 82,644 82,644
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 332,796 332,796 332,796 332,796 332,796 332,796 332,796 332,796
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 198,485 198,485 198,485 198,485 198,485 198,485 198,485 198,485
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 567,861 567,861 567,861 567,861 567,861 567,861 567,861 567,861
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,524,708 1,524,708 1,524,708 1,524,708 1,524,708 1,524,708 1,524,708 1,524,708
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,253,091 2,253,091 2,253,091 2,253,091 2,253,091 2,253,091 2,253,091 2,253,091

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,774 11,774 11,774 11,774 11,774 11,774 11,774 11,774
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 26,835 26,835 26,835 26,835 26,835 26,835 26,835 26,835
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 135,911 163,127 108,695 155,063 139,943 152,039 136,919 187,319
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 67,085 56,212 83,590 73,073 50,224 89,934 70,600 61,485
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 153,630 168,135 146,599 143,084 129,023 157,145 137,811 134,296
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 160,676 196,545 155,551 165,800 160,676 170,924 155,551 191,421
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 94,337 115,232 89,113 99,561 94,337 104,785 89,113 125,680
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 125,961 148,776 103,146 142,016 129,341 139,481 126,806 169,056

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 130,542 130,542 130,542 130,542 130,542 130,542 130,542 130,542
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ###
p 1,363,499 1,363,499 1,363,499 1,363,499 1,363,499 1,363,499 1,363,499 1,363,499
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### i 170,680 170,680 170,680 170,680 170,680 170,680 170,680 170,680
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### o 1,579,336 1,579,336 1,579,336 1,579,336 1,579,336 1,579,336 1,579,336 1,579,336
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,100,584 1,100,584 1,100,584 1,100,584 1,100,584 1,100,584 1,100,584 1,100,584
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 64,702 64,702 64,702 64,702 64,702 64,702 64,702 64,702
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 129,585 129,585 129,585 129,585 129,585 129,585 129,585 129,585
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 306,268 306,268 306,268 306,268 306,268 306,268 306,268 306,268
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 306,261 306,261 306,261 306,261 306,261 306,261 306,261 306,261
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 491,823 491,823 491,823 491,823 491,823 491,823 491,823 491,823
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 129,640 129,640 129,640 129,640 129,640 129,640 129,640 129,640
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 129,640 129,640 129,640 129,640 129,640 129,640 129,640 129,640
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 306,268 306,268 306,268 306,268 306,268 306,268 306,268 306,268
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 306,268 306,268 306,268 306,268 306,268 306,268 306,268 306,268
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 491,823 491,823 491,823 491,823 491,823 491,823 491,823 491,823
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 490,708 490,708 490,708 490,708 490,708 490,708 490,708 490,708
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 799,028 799,028 799,028 799,028 799,028 799,028 799,028 799,028
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,283,257 1,283,257 1,283,257 1,283,257 1,283,257 1,283,257 1,283,257 1,283,257
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 79,327 79,327 79,327 79,327 79,327 79,327 79,327 79,327
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 410,035 410,035 410,035 410,035 410,035 410,035 410,035 410,035
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 462,863 462,863 462,863 462,863 462,863 462,863 462,863 462,863
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,278,836 1,278,836 1,278,836 1,278,836 1,278,836 1,278,836 1,278,836 1,278,836
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 74,939 75,175 74,704 75,105 74,974 75,079 74,948 75,384
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 371,376 371,376 371,376 371,376 371,376 371,376 371,376 371,376
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 56,805 56,805 56,805 56,805 56,805 56,805 56,805 56,805
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 80,442 80,442 80,442 80,442 80,442 80,442 80,442 80,442
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 116,198 116,198 116,198 116,198 116,198 116,198 116,198 116,198
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 178,420 178,420 178,420 178,420 178,420 178,420 178,420 178,420
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 286,965 286,965 286,965 286,965 286,965 286,965 286,965 286,965
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 414,568 414,568 414,568 414,568 414,568 414,568 414,568 414,568
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 525,152 525,152 525,152 525,152 525,152 525,152 525,152 525,152
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 690,697 690,697 690,697 690,697 690,697 690,697 690,697 690,697
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 951,181 951,181 951,181 951,181 951,181 951,181 951,181 951,181

4 ALCANTARILLADO - SUMIDEROS Y POZOS

4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 783,991 807,356 760,624 800,434 787,452 797,837 784,856 828,127

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO


4.2 E=1.5CM Y CAÑUELA)
ML ### 758,069 774,580 741,558 769,688 760,515 767,853 758,681 789,257

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO
4.3 Y TAPA HF)
UN ### 823,670 839,248 808,093 834,632 825,978 832,901 824,247 853,094

4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 935,127 964,334 905,919 955,680 939,453 952,434 936,208 990,297

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO


4.5 E=1.5CM Y CAÑUELA)
ML ### 1,080,381 1,103,631 1,057,130 1,096,742 1,083,825 1,094,159 1,081,242 1,124,298

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO
4.6 Y TAPA HF)
UN ### 957,401 978,820 935,982 972,474 960,574 970,093 958,194 997,859
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,102,039 1,112,680 1,091,401 1,109,526 1,103,616 1,108,345 1,102,435 1,122,137
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,630,080 1,661,864 1,598,303 1,652,444 1,634,790 1,648,914 1,631,261 1,690,112
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,291,768 2,353,547 2,229,988 2,335,244 2,300,920 2,328,377 2,294,057 2,408,464
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 3,063,629 3,166,323 2,960,935 3,135,897 3,078,842 3,124,484 3,067,434 3,257,609
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 2,072,163 2,072,163 2,072,163 2,072,163 2,072,163 2,072,163 2,072,163 2,072,163
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,395,831 4,395,831 4,395,831 4,395,831 4,395,831 4,395,831 4,395,831 4,395,831
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE
4.13 INTERNO Y DEMOLICIÓN)
UN ### 153,528 154,201 152,854 154,002 153,627 153,927 153,552 154,800
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
p
5 ANDENES Y SARDINELES i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### o 82,936 84,164 81,707 83,800 83,118 83,664 82,981 85,256
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 98,328 99,556 97,099 99,192 98,510 99,056 98,373 100,648
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 68,804 72,962 64,646 71,730 69,420 71,268 68,958 76,658
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 73,989 78,078 69,900 76,867 74,595 76,413 74,141 81,713
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 74,047 78,000 70,093 76,829 74,632 76,390 74,193 81,515
5.6 BORDE SEPARADOR VERDE A-170 ML ### 289,174 289,848 288,500 289,648 289,273 289,573 289,199 290,447
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 20,771 21,270 20,272 21,122 20,845 21,066 20,789 21,713
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 49,069 52,000 46,139 51,131 49,503 50,806 49,178 54,605
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 94,151 94,511 93,790 94,404 94,204 94,364 94,164 94,831
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 633,049 642,043 624,055 639,378 634,381 638,379 633,382 650,038
5.11 LOSETA PREFABRICADA A-40 M2 ### 72,558 74,100 71,015 73,643 72,786 73,471 72,615 75,471
5.12 LOSETA PREFABRICADA A-60 M2 ### 105,026 106,568 103,484 106,111 105,255 105,940 105,083 107,939
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 39,463 41,099 37,828 40,614 39,706 40,432 39,524 42,553
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 64,870 68,180 61,559 67,199 65,360 66,831 64,992 71,122
5.15 SARDINEL PREFABRICADO A-10 ML ### 110,458 117,186 111,491 114,294 116,880 113,259 110,870 118,502
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 68,953 69,886 68,020 69,610 69,092 69,506 68,988 70,716

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 231,545 233,492 229,597 232,915 231,833 232,699 231,617 235,223
6.2 BANCA EN CONCRETO M-30 UN ### 758,640 761,366 755,914 760,558 759,044 760,255 758,741 763,789
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 242,126 242,533 241,718 242,412 242,186 242,367 242,141 242,896
6.4 BOLARDO M-60 CONCRETO UN ### 184,980 187,316 182,643 186,624 185,326 186,364 185,066 189,393
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 186,959 189,296 184,623 188,604 187,305 188,344 187,046 191,373
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 219,426 221,872 216,981 221,147 219,789 220,875 219,517 224,046
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 65,659 66,599 64,718 66,321 65,798 66,216 65,693 67,435
6.8 BORDILLO PREFABRICADO A-80 ML ### 77,393 78,446 76,340 78,134 77,549 78,017 77,432 79,382
6.9 CANECA M-120 UN ### 353,243 353,478 353,008 353,409 353,278 353,382 353,252 353,687
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 932,118 933,286 930,949 932,940 932,291 932,810 932,161 934,325
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,832,095 3,832,874 3,831,316 3,832,643 3,832,210 3,832,556 3,832,124 3,833,566
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,942,272 3,943,051 3,941,493 3,942,820 3,942,387 3,942,733 3,942,301 3,943,743
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 551,608 552,423 550,793 552,181 551,728 552,091 551,638 553,147
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 734,192 737,452 730,931 736,486 734,675 736,124 734,313 740,351
6.15 BANCA EN MADERA M-50 UN ### 604,899 604,899 604,899 604,899 604,899 604,899 604,899 604,899
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 279,789 280,957 278,620 280,611 279,962 280,481 279,832 281,995
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 652,551 653,139 651,963 652,965 652,638 652,900 652,573 653,662
6.18 POSTE HISTÓRICO M-131 UN ### 7,290,612 7,296,454 7,284,771 7,294,723 7,291,478 7,294,074 7,290,829 7,301,646

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,573 4,573 4,573 4,573 4,573 4,573 4,573 4,573
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 48,368 48,368 48,368 48,368 48,368 48,368 48,368 48,368
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 354,746 355,082 354,409 354,983 354,795 354,945 354,758 355,382
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 558,143 559,774 556,513 559,291 558,385 559,110 558,204 561,223
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 261,914 262,251 261,577 262,151 261,964 262,114 261,927 262,551
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 278,444 278,781 278,107 278,681 278,494 278,644 278,457 279,081
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 290,962 291,299 290,625 291,199 291,012 291,162 290,975 291,599
7.8 TACHAS REFLECTIVAS UN ### 15,190 15,190 15,190 15,190 15,190 15,190 15,190 15,190
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 16,238 16,238 16,238 16,238 16,238 16,238 16,238 16,238
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E
7.10 INSTALACIÓN)
UN ### 133,145 133,145 133,145 133,145 133,145 133,145 133,145 133,145
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
VÍAS (SEGÚN ESPECIFICACIONES p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
1.1 201 P UNA DISTANCIA DE 5KM) M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.2 201 P DISTANCIA DE 5KM)
M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.3 200.1 DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE


1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA


1.5 201.7 DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,


1.6 *** SOBREACARREOS Y DERRUMBES ###
M3-KM 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 37,369 37,369 37,369 37,369 37,369 37,369 37,369 37,369
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494 494 494 494 494 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA


2.9 600.1 DISTANCIA MENOR DE 5 KM)
M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA


2.10 600.2 DISTANCIA MENOR DE 5 KM) M3 ### 68,134 68,134 68,134 68,134 68,134 68,134 68,134 68,134

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA


2.11 600.3 DISTANCIA MENOR DE 5 KM) M3 ### 83,300 83,300 83,300 83,300 83,300 83,300 83,300 83,300

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A


2.12 600.4 UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE


2.13 600.4 P SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE


2.14 600.5 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO


2.15 600.5 P DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 132,264 188,507 144,567 163,900 188,507 155,112 135,779 197,295
3.3 330.1 BASE GRANULAR M3 ### 145,929 202,172 158,232 177,566 202,172 168,778 149,444 210,960
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE
3.4 365.1 ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,603 3,603 3,603 3,603 3,603 3,603 3,603 3,603
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,220 1,220 1,220 1,220 1,220 1,220 1,220 1,220
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 257,225 264,612 249,838 262,424 258,320 261,603 257,499 271,179
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 78,445 80,797 76,094 80,100 78,794 79,839 78,532 82,887
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 567,301 702,501 643,351 694,051 626,451 677,151 668,701 744,751
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 570,074 705,274 561,624 597,114 629,224 588,664 578,524 641,054
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 611,103 746,303 602,653 638,143 670,253 629,693 619,553 682,083
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 592,522 727,722 584,072 619,562 651,672 611,112 600,972 663,502
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### p 315,057 291,492 325,843 372,824 380,563 341,143 348,883 312,337
i
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### o 314,471 370,715 326,775 346,108 370,715 337,320 317,987 379,503
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 299,069 355,312 311,372 330,706 355,312 321,918 302,584 364,100
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 42,856 42,856 42,856 42,856 42,856 42,856 42,856 42,856

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 192,360 192,360 192,360 192,360 192,360 192,360 192,360 192,360
3.15 311.1 AFIRMADO M3 ### 148,076 162,582 141,046 137,531 123,470 151,592 132,258 128,743
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 13,508 14,027 12,990 13,873 13,585 13,816 13,528 14,488
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,539 5,798 5,280 5,721 5,577 5,692 5,548 6,028
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO
3.18 500.1 DE TRANSFERENCIA Y UNIÓN
M3 ### 764,157 801,008 727,306 790,090 769,616 785,995 765,522 833,765

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO


3.19 500.1 DE TRANSFERENCIA Y UNIÓN
M3 ### 803,207 841,707 764,705 830,300 808,910 826,022 804,633 875,931

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO


3.20 500.1 DE TRANSFERENCIA Y UNIÓN
M3 ### 829,068 868,637 789,498 856,914 834,930 852,516 830,534 903,811

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA,


3.21 *** SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,687 7,687 7,687 7,687 7,687 7,687 7,687 7,687
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 131,196 160,940 123,760 138,632 131,196 146,068 123,760 175,812

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 1,061,357 1,103,158 1,019,555 1,090,773 1,067,549 1,086,128 1,062,905 1,140,315
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 924,822 965,930 883,714 953,751 930,912 949,182 926,345 1,002,471
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 977,194 1,019,930 934,458 1,007,268 983,525 1,002,519 978,777 1,057,918
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 688,908 726,938 650,877 715,671 694,542 711,444 690,317 760,744
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 793,720 833,256 754,183 821,543 799,577 817,148 795,184 868,401
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 688,356 727,689 649,023 716,035 694,183 711,664 689,813 762,652
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 793,146 834,036 752,255 821,922 799,204 817,377 794,660 870,384
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 853,927 893,260 814,594 881,606 859,754 877,235 855,384 928,223
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 711,803 752,693 670,911 740,578 717,860 736,033 713,317 789,041
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 903,491 944,381 862,600 932,266 909,548 927,722 905,005 980,729
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,878 12,878 12,878 12,878 12,878 12,878 12,878 12,878

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588


4.12 650 P GRADO B KG ### 16,660 16,660 16,660 16,660 16,660 16,660 16,660 16,660
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,954 1,954 1,954 1,954 1,954 1,954 1,954 1,954
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE
4.14 621.1 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,952,045 2,952,045 2,952,045 2,952,045 2,952,045 2,952,045 2,952,045 2,952,045

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL


4.15 621.1 P (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
ML ### 4,549,155 4,620,656 4,477,653 4,599,472 4,559,748 4,591,526 4,551,803 4,684,215

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,895,554 1,934,497 1,856,610 1,922,959 1,901,323 1,918,631 1,896,996 1,969,114
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 97,688 97,688 97,688 97,688 97,688 97,688 97,688 97,688
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 400,680 405,353 396,006 403,968 401,372 403,449 400,853 409,507
4.19 632 P BARANDA METÁLICA ML ### 464,740 464,740 464,740 464,740 464,740 464,740 464,740 464,740
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 18,907 18,907 18,907 18,907 18,907 18,907 18,907 18,907
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 641,914 691,630 596,799 664,129 632,815 668,248 633,691 707,063
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 187,401 239,453 179,965 194,837 187,401 202,273 179,965 232,017
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 72,817 62,781 88,053 78,345 57,253 93,909 76,062 67,648
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 489,800 530,966 448,635 518,769 495,899 514,195 491,325 567,558
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 447,698 482,969 420,539 467,611 451,321 467,598 445,900 510,115
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 456,369 491,640 429,210 476,282 459,992 476,269 454,571 518,786
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 462,050 496,627 435,585 481,475 465,570 481,538 460,226 523,155
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 470,721 505,298 444,256 490,146 474,241 490,209 468,897 531,826
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ###
p 632,043 672,040 592,046 660,190 637,969 655,745 633,525 707,593
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### i 734,858 776,439 693,277 764,119 741,018 759,498 736,398 813,400
4.31 681.1 GAVIÓN M3 ### o 227,039 255,431 219,941 234,137 227,039 241,235 219,941 269,627
4.32 681.1 GAVIÓN MALLA PVC M3 ### 231,757 260,149 224,659 238,855 231,757 245,953 224,659 274,345
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 50,138 52,593 47,682 51,866 50,501 51,593 50,229 54,775
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### 20,012 21,240 18,784 20,876 20,194 20,740 20,058 22,331

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA


4.35 *** ÚLTIMA 25 KN) M2 ### 11,291 11,291 11,291 11,291 11,291 11,291 11,291 11,291

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 16,162 16,162 16,162 16,162 16,162 16,162 16,162 16,162
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 21,802 21,802 21,802 21,802 21,802 21,802 21,802 21,802
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA
4.38 *** ÚLTIMA 100 KN)
M2 ### 26,166 26,166 26,166 26,166 26,166 26,166 26,166 26,166

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA


4.39 *** ÚLTIMA 165 KN) M2 ### 33,666 33,666 33,666 33,666 33,666 33,666 33,666 33,666

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y


4.40 *** SEPARACIÓN)
M2 ### 8,104 8,104 8,104 8,104 8,104 8,104 8,104 8,104

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y


4.41 *** SEPARACIÓN)
M2 ### 9,249 9,249 9,249 9,249 9,249 9,249 9,249 9,249

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y


4.42 *** SEPARACIÓN)
M2 ### 9,617 9,617 9,617 9,617 9,617 9,617 9,617 9,617

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y


4.43 *** SEPARACIÓN)
M2 ### 6,821 6,821 6,821 6,821 6,821 6,821 6,821 6,821

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y


4.44 *** SEPARACIÓN)
M2 ### 10,327 10,327 10,327 10,327 10,327 10,327 10,327 10,327

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y


4.45 *** SEPARACIÓN) M2 ### 8,402 8,402 8,402 8,402 8,402 8,402 8,402 8,402

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y


4.46 *** SEPARACIÓN)
M2 ### 10,327 10,327 10,327 10,327 10,327 10,327 10,327 10,327

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y


4.47 *** SEPARACIÓN)
M2 ### 19,940 19,940 19,940 19,940 19,940 19,940 19,940 19,940

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I,


4.48 661.1 INCLUYE EMBOQUILLADA
ML ### 709,598 710,122 709,075 709,967 709,676 709,908 709,618 710,587

4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 421,666 430,492 412,841 427,877 422,974 426,896 421,993 438,337

4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 994,131 994,131 994,131 994,131 994,131 994,131 994,131 994,131
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 216,579 230,526 209,819 206,439 192,919 219,959 201,369 197,989
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,973 4,973 4,973 4,973 4,973 4,973 4,973 4,973
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 96,901 96,901 96,901 96,901 96,901 96,901 96,901 96,901

4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 147,723 147,723 147,723 147,723 147,723 147,723 147,723 147,723
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 645,918 687,499 604,337 675,179 652,078 670,558 647,458 724,460
4.56 682.1 P COLCHONETA RENO M3 ### 244,212 272,604 237,114 251,310 244,212 258,408 237,114 286,800
4.57 *** TRINCHO EN MADERA M2 ### 76,572 76,572 76,572 76,572 76,572 76,572 76,572 76,572

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,573 4,573 4,573 4,573 4,573 4,573 4,573 4,573
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 48,368 48,368 48,368 48,368 48,368 48,368 48,368 48,368
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 94,509 94,509 94,509 94,509 94,509 94,509 94,509 94,509
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 78,557 78,557 78,557 78,557 78,557 78,557 78,557 78,557
5.5 730.1 DEFENSA METÁLICA ML ### 168,223 170,038 166,409 169,500 168,492 169,299 168,291 171,651
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 15,190 15,190 15,190 15,190 15,190 15,190 15,190 15,190
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: RIONEGRO
u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c El_Peñon La_Palma Pacho Paime San_Cayetano Topaipí Villa_Gomez Yacopí
i
p
6 NORMA INV MANTENIMIENTO VIAL i
6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### o 886 886 886 886 886 886 886 886

LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE


6.2 801.6 RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y


6.3 801.7 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA
6.6 801.4 DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 16,717 16,717 16,717 16,717 16,717 16,717 16,717 16,717
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 27,258 27,258 27,258 27,258 27,258 27,258 27,258 27,258
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 10,044 10,044 10,044 10,044 10,044 10,044 10,044 10,044

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
CONSTRUCCIÓN
p
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,025,968 2,030,606 2,020,668 2,032,593 2,026,632 2,027,955 2,029,944 2,028,619 2,018,019
1.2 CAMPAMENTO 9 M2 UN ### 1,186,674 1,188,993 1,184,024 1,189,987 1,187,006 1,187,668 1,188,662 1,188,000 1,182,699
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,661 14,661 14,661 14,661 14,661 14,661 14,661 14,661 14,661
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,432 16,432 16,432 16,432 16,432 16,432 16,432 16,432 16,432
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,022 19,022 19,022 19,022 19,022 19,022 19,022 19,022 19,022
1.6 CERCA EN TABLA H=2.30 M ML ### 66,993 66,993 66,993 66,993 66,993 66,993 66,993 66,993 66,993
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 46,862 46,912 46,804 46,934 46,869 46,883 46,905 46,891 46,775
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,694 21,745 21,636 21,766 21,701 21,716 21,737 21,723 21,607
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 915,798 916,504 915,219 916,522 916,069 916,513 915,735 916,088 914,929
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 10,544 10,544 10,544 10,544 10,544 10,544 10,544 10,544 10,544
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,832 3,832 3,832 3,832 3,832 3,832 3,832 3,832 3,832
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,731,293 2,731,293 2,731,293 2,731,293 2,731,293 2,731,293 2,731,293 2,731,293 2,731,293
1.44 RED TELEFÓNICA PROVISIONAL UN ### 253,965 253,965 253,965 253,965 253,965 253,965 253,965 253,965 253,965
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 73,675 79,720 76,205 76,205 79,720 84,993 67,417 70,932 76,205
2.2 BASE ARENA CEMENTO 1:20 M3 ### 149,587 152,201 146,599 153,322 149,960 150,707 151,828 151,081 145,105
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ###
p 22,603 22,603 22,603 22,603 22,603 22,603 22,603 22,603 22,603
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### i 630,212 635,178 624,536 637,306 630,922 632,340 634,468 633,050 621,699
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### o 632,141 637,300 626,243 639,511 632,878 634,350 636,563 635,089 623,295
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 589,322 594,153 583,800 596,223 590,012 591,391 593,462 592,082 581,040
2.9 PILOTE DE MADERA D=20 CM ML ### 50,915 50,915 50,915 50,915 50,915 50,915 50,915 50,915 50,915
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
2.10 DISTANCIA MENOR DE 5 KM)
ML ### 157,208 157,208 157,208 157,208 157,208 157,208 157,208 157,208 157,208

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.11 DISTANCIA MENOR DE 5 KM) ML ### 195,582 195,582 195,582 195,582 195,582 195,582 195,582 195,582 195,582

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.12 DISTANCIA MENOR DE 5 KM) ML ### 241,987 241,987 241,987 241,987 241,987 241,987 241,987 241,987 241,987

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA


2.13 DISTANCIA MENOR DE 5 KM)
ML ### 304,457 304,457 304,457 304,457 304,457 304,457 304,457 304,457 304,457
2.14 PILOTE HINCADO 25X25 ML ### 105,456 105,809 105,052 105,960 105,506 105,607 105,758 105,657 104,851
2.15 PILOTE HINCADO 30X30 ML ### 129,545 130,056 128,960 130,276 129,618 129,764 129,983 129,837 128,668
2.16 DADOS EN CONCRETO 3500PSI M3 ### 574,324 579,154 568,802 581,225 575,014 576,393 578,464 577,084 566,041
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM)
ML ### 94,164 94,164 94,164 94,164 94,164 94,164 94,164 94,164 94,164

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 39,089 39,105 39,071 39,112 39,092 39,096 39,103 39,099 39,061
3.2 SIFÓN EN PVC 6" UN ### 200,915 200,931 200,896 200,938 200,917 200,922 200,929 200,924 200,887
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 447,675 450,938 445,833 449,977 449,557 452,495 444,927 448,596 444,912
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 228,243 228,938 227,608 229,037 228,462 228,830 228,371 228,561 227,291
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 257,072 258,163 256,076 258,318 257,416 257,994 257,273 257,571 255,578
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 334,289 335,984 332,602 336,398 334,719 335,469 335,007 335,133 331,758
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 109,425 109,445 109,425 109,425 109,445 109,475 109,375 109,425 109,425
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,301,594 1,301,793 1,301,594 1,301,594 1,301,793 1,302,092 1,301,097 1,301,594 1,301,594
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 115,154 115,334 114,949 115,410 115,180 115,231 115,308 115,257 114,846
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 72,612 72,707 72,504 72,747 72,626 72,653 72,693 72,666 72,450
3.11 TUBERÍA DRENAJE PVC 110 ML ### 28,364 28,458 28,256 28,498 28,377 28,404 28,445 28,418 28,202
3.12 TUBERÍA DRENAJE PVC 160 ML ### 45,618 45,712 45,510 45,752 45,631 45,658 45,698 45,671 45,456
3.13 TUBERÍA DRENAJE PVC 200 ML ### 59,731 59,863 59,580 59,919 59,749 59,787 59,844 59,806 59,504
3.14 TUBERÍA DRENAJE PVC 250 ML ### 81,652 81,803 81,480 81,868 81,674 81,717 81,781 81,738 81,394
3.15 TUBERÍA DRENAJE PVC 315 ML ### 112,953 113,084 112,802 113,141 112,971 113,009 113,066 113,028 112,726
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 967,889 969,397 966,166 970,043 968,104 968,535 969,182 968,751 965,304

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3.17 FILTRANTE)
UN ### 1,363,426 1,366,442 1,359,979 1,367,734 1,363,857 1,364,718 1,366,011 1,365,150 1,358,256

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL


3.18 FILTRANTE) UN ### 1,767,828 1,773,858 1,760,933 1,776,444 1,768,689 1,770,412 1,772,997 1,771,274 1,757,487

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 43,183 43,183 43,183 43,183 43,183 43,183 43,183 43,183 43,183
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 56,849 56,849 56,849 56,849 56,849 56,849 56,849 56,849 56,849
4.3 COLUMNAS 3500 PSI M3 ### 802,802 807,633 797,281 809,703 803,493 804,872 806,943 805,563 794,520
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 235,974 242,467 230,702 241,309 238,513 238,159 236,584 238,192 228,067
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
4.5 REFUERZO, CONCRETO DE 3500 PSI
M2 ### 97,827 98,296 97,290 98,497 97,894 98,027 98,229 98,095 97,022

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE


4.6 REFUERZO, CONCRETO DE 3500 PSI
M2 ### 115,171 115,733 114,527 115,975 115,251 115,412 115,653 115,492 114,206
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 129,080 129,830 128,222 130,152 129,187 129,401 129,723 129,508 127,793
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 136,138 136,936 135,227 137,277 136,252 136,480 136,822 136,594 134,771
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 155,368 156,353 154,242 156,775 155,509 155,790 156,212 155,931 153,679
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 172,552 173,678 171,266 174,160 172,713 173,034 173,517 173,195 170,622
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ###
i 191,408 192,674 189,960 193,217 191,588 191,950 192,493 192,131 189,236
p
4.12 ENTREPISO VIGUETA PLACA M2 ### i 101,233 101,298 101,160 101,325 101,243 101,261 101,289 101,270 101,123
4.13 ESCALERA MACIZA 3500 PSI M3 ### o 954,379 959,210 948,857 961,280 955,069 956,448 958,520 957,140 946,097
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 96,886 96,956 96,805 96,987 96,896 96,916 96,946 96,926 96,765
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 78,578 79,061 78,026 79,268 78,647 78,785 78,992 78,854 77,750
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 88,047 88,638 87,371 88,891 88,131 88,300 88,553 88,384 87,034
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 102,191 102,932 101,344 103,250 102,297 102,509 102,826 102,615 100,921
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 699,890 704,720 694,368 706,791 700,580 701,959 704,030 702,650 691,607
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 50,545 50,694 50,374 50,758 50,566 50,609 50,673 50,630 50,289
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 276,107 278,264 273,641 279,189 276,415 277,031 277,956 277,340 272,408
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,269 4,269 4,269 4,269 4,269 4,269 4,269 4,269 4,269
4.22 ACERO FIGURADO 60000 PSI KG ### 4,477 4,477 4,477 4,477 4,477 4,477 4,477 4,477 4,477
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,356 6,356 6,356 6,356 6,356 6,356 6,356 6,356 6,356
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 854,607 859,438 849,085 861,508 855,297 856,676 858,747 857,367 846,325
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 771,145 776,432 765,102 778,697 771,900 773,409 775,676 774,166 762,081
4.26 VIGA AÉREA 3500 PSI M3 ### 845,291 850,121 839,769 852,192 845,981 847,360 849,431 848,051 837,008
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 823,984 828,815 818,462 830,885 824,674 826,053 828,125 826,744 815,702
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,046,619 1,051,450 1,041,097 1,053,520 1,047,309 1,048,688 1,050,760 1,049,379 1,038,337
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 296,673 301,981 290,608 304,255 297,433 298,948 301,223 299,707 287,575

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,101 30,217 29,969 30,266 30,118 30,151 30,200 30,167 29,903
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 51,647 51,762 51,514 51,812 51,663 51,696 51,746 51,713 51,448
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,169 36,186 36,151 36,192 36,172 36,176 36,183 36,179 36,141
5.4 ARCOS EN LADRILLO PRENSADO ML ### 170,106 170,139 170,069 170,153 170,111 170,120 170,134 170,125 170,051
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,055 45,204 44,884 45,268 45,076 45,119 45,183 45,140 44,799
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,859 27,930 27,779 27,960 27,869 27,889 27,920 27,899 27,739
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 100,247 100,312 100,173 100,340 100,256 100,275 100,302 100,284 100,135
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 90,571 91,069 90,002 91,282 90,642 90,784 90,998 90,855 89,718
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 94,327 94,327 94,327 94,327 94,327 94,327 94,327 94,327 94,327
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,563 55,563 55,563 55,563 55,563 55,563 55,563 55,563 55,563
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 90,906 90,906 90,906 90,906 90,906 90,906 90,906 90,906 90,906
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 53,852 53,852 53,852 53,852 53,852 53,852 53,852 53,852 53,852
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 104,976 104,976 104,976 104,976 104,976 104,976 104,976 104,976 104,976
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,288 62,288 62,288 62,288 62,288 62,288 62,288 62,288 62,288
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 116,588 116,588 116,588 116,588 116,588 116,588 116,588 116,588 116,588
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,094 68,094 68,094 68,094 68,094 68,094 68,094 68,094 68,094
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 41,424 41,457 41,387 41,471 41,429 41,438 41,452 41,443 41,368
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,285 25,301 25,266 25,308 25,287 25,292 25,299 25,294 25,257
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 54,089 54,111 54,064 54,120 54,092 54,098 54,107 54,101 54,052
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 32,746 32,757 32,734 32,762 32,748 32,751 32,756 32,753 32,728
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 60,904 60,926 60,880 60,936 60,908 60,914 60,923 60,917 60,867
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 36,868 36,879 36,856 36,884 36,870 36,873 36,877 36,874 36,849
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 99,859 99,968 99,735 100,015 99,875 99,906 99,952 99,921 99,673
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 59,553 59,608 59,491 59,631 59,561 59,577 59,600 59,584 59,460
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 38,160 38,182 38,135 38,191 38,163 38,169 38,178 38,172 38,122
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,300 23,310 23,287 23,315 23,301 23,304 23,309 23,306 23,281
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 75,704 75,747 75,654 75,766 75,710 75,722 75,741 75,729 75,629
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,973 45,995 45,948 46,004 45,976 45,982 45,991 45,985 45,935
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 89,930 90,001 89,850 90,031 89,940 89,960 89,990 89,970 89,809
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 54,864 54,899 54,824 54,914 54,869 54,879 54,894 54,884 54,804
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 183,491 183,644 183,317 183,709 183,513 183,557 183,622 183,578 183,230
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 111,243 111,320 111,156 111,352 111,254 111,276 111,309 111,287 111,113
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ###
p 90,639 90,707 90,562 90,736 90,649 90,668 90,697 90,678 90,523
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### i 55,218 55,252 55,180 55,267 55,223 55,233 55,247 55,238 55,160
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### o 47,401 47,449 47,345 47,470 47,408 47,422 47,442 47,429 47,317
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,105 29,129 29,077 29,140 29,108 29,115 29,126 29,119 29,063
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 34,575 34,597 34,550 34,606 34,578 34,584 34,593 34,587 34,537
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,215 21,226 21,203 21,231 21,217 21,220 21,225 21,222 21,197
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 51,716 51,760 51,667 51,778 51,722 51,735 51,754 51,741 51,642
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,986 32,008 31,961 32,017 31,989 31,995 32,005 31,998 31,949
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 99,960 100,025 99,886 100,053 99,969 99,988 100,016 99,997 99,848
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 61,373 61,406 61,336 61,420 61,378 61,387 61,401 61,392 61,317
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 73,123 73,166 73,073 73,185 73,129 73,141 73,160 73,148 73,048
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 44,467 44,489 44,442 44,498 44,470 44,477 44,486 44,480 44,430
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 152,296 152,448 152,121 152,513 152,317 152,361 152,426 152,383 152,034
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 93,488 93,564 93,401 93,597 93,499 93,521 93,553 93,531 93,357
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 32,558 32,574 32,539 32,581 32,560 32,565 32,572 32,567 32,530
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,494 36,543 36,438 36,564 36,501 36,515 36,536 36,522 36,411
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 62,068 62,133 61,994 62,161 62,077 62,096 62,124 62,105 61,957
5.50 LAVADA DE FACHADA M2 ### 5,535 5,535 5,535 5,535 5,535 5,535 5,535 5,535 5,535
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 52,023 52,139 51,891 52,189 52,040 52,073 52,123 52,090 51,825
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,138 11,138 11,138 11,138 11,138 11,138 11,138 11,138 11,138
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,600 14,600 14,600 14,600 14,600 14,600 14,600 14,600 14,600
5.54 ANCLAJE 1/2" L=50CM UN ### 19,043 19,043 19,043 19,043 19,043 19,043 19,043 19,043 19,043
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,460 26,460 26,460 26,460 26,460 26,460 26,460 26,460 26,460
5.56 ANCLAJE 3/4" L=70CM UN ### 39,190 39,190 39,190 39,190 39,190 39,190 39,190 39,190 39,190
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 4,889 4,925 4,848 4,940 4,894 4,904 4,920 4,909 4,827

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,969 16,969 16,969 16,969 16,969 16,969 16,969 16,969 16,969
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,711 5,727 5,692 5,734 5,713 5,718 5,725 5,720 5,683
6.3 FILOS O DILATACIONES S/MURO ML ### 6,968 6,984 6,949 6,991 6,970 6,975 6,982 6,977 6,940
6.4 GOTERA EN MORTERO 1:4 ML ### 8,278 8,295 8,260 8,302 8,281 8,285 8,292 8,288 8,251
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,038 7,038 7,038 7,038 7,038 7,038 7,038 7,038 7,038
6.6 MALLA BAJO ENTRAMADO M2 ### 14,322 14,322 14,322 14,322 14,322 14,322 14,322 14,322 14,322
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,374 24,422 24,320 24,442 24,381 24,394 24,415 24,401 24,293
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 14,937 14,960 14,910 14,971 14,940 14,947 14,957 14,950 14,896
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,162 21,208 21,110 21,227 21,169 21,182 21,201 21,188 21,084
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,002 13,025 12,976 13,035 13,005 13,012 13,022 13,015 12,963
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 20,250 20,297 20,195 20,317 20,256 20,270 20,290 20,277 20,168
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,546 12,569 12,519 12,580 12,549 12,556 12,566 12,559 12,505
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,162 21,208 21,110 21,227 21,169 21,182 21,201 21,188 21,084
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,002 13,025 12,976 13,035 13,005 13,012 13,022 13,015 12,963
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 21,690 21,723 21,651 21,738 21,694 21,704 21,719 21,709 21,632
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,265 13,281 13,245 13,289 13,267 13,272 13,279 13,274 13,236
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,695 17,730 17,655 17,744 17,700 17,710 17,725 17,715 17,635
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 10,963 10,980 10,943 10,987 10,965 10,970 10,977 10,972 10,933
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,000 17,036 16,958 17,051 17,005 17,015 17,031 17,020 16,938
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,615 10,633 10,594 10,641 10,617 10,623 10,630 10,625 10,584
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 21,987 22,033 21,935 22,052 21,994 22,007 22,026 22,013 21,909
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,393 13,416 13,367 13,426 13,396 13,403 13,413 13,406 13,354
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,075 21,122 21,020 21,142 21,081 21,095 21,115 21,102 20,993
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 12,937 12,961 12,910 12,971 12,940 12,947 12,957 12,951 12,896
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 17,647 17,683 17,605 17,698 17,652 17,662 17,677 17,667 17,585
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,919 10,938 10,899 10,945 10,922 10,927 10,935 10,930 10,889
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,017 22,065 21,963 22,085 22,024 22,038 22,058 22,044 21,936
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ###
p 13,837 13,861 13,810 13,871 13,840 13,847 13,857 13,850 13,796
i
7 CUBIERTAS o
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 26,696 26,762 26,622 26,790 26,706 26,724 26,752 26,734 26,584
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
7.2 TELA IMPERMEABLE) M2 ### 83,778 84,027 83,493 84,133 83,813 83,885 83,991 83,920 83,351
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 56,574 56,574 56,574 56,574 56,574 56,574 56,574 56,574 56,574
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,820 22,820 22,820 22,820 22,820 22,820 22,820 22,820 22,820
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,734 35,734 35,734 35,734 35,734 35,734 35,734 35,734 35,734
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 82,434 82,434 82,434 82,434 82,434 82,434 82,434 82,434 82,434
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 64,722 64,722 64,722 64,722 64,722 64,722 64,722 64,722 64,722
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 37,974 37,974 37,974 37,974 37,974 37,974 37,974 37,974 37,974
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 86,355 86,355 86,355 86,355 86,355 86,355 86,355 86,355 86,355
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 102,963 102,963 102,963 102,963 102,963 102,963 102,963 102,963 102,963
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 150,943 150,943 150,943 150,943 150,943 150,943 150,943 150,943 150,943
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 60,222 60,222 60,222 60,222 60,222 60,222 60,222 60,222 60,222
7.13 CANAL PVC AMAZONAS ML ### 83,999 83,999 83,999 83,999 83,999 83,999 83,999 83,999 83,999
7.14 CANAL PVC RAINGO ML ### 76,509 76,509 76,509 76,509 76,509 76,509 76,509 76,509 76,509
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 134,400 134,400 134,400 134,400 134,400 134,400 134,400 134,400 134,400
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 78,305 78,305 78,305 78,305 78,305 78,305 78,305 78,305 78,305
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 57,691 57,691 57,691 57,691 57,691 57,691 57,691 57,691 57,691
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,518 33,518 33,518 33,518 33,518 33,518 33,518 33,518 33,518
7.19000000000001 TEJA DE BARRO M2 ### 59,883 59,964 59,790 59,999 59,895 59,918 59,953 59,930 59,744
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 48,072 48,072 48,072 48,072 48,072 48,072 48,072 48,072 48,072
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 44,113 44,113 44,113 44,113 44,113 44,113 44,113 44,113 44,113
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 37,695 37,695 37,695 37,695 37,695 37,695 37,695 37,695 37,695
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 36,867 36,867 36,867 36,867 36,867 36,867 36,867 36,867 36,867
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,139 37,139 37,139 37,139 37,139 37,139 37,139 37,139 37,139
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 51,869 51,869 51,869 51,869 51,869 51,869 51,869 51,869 51,869
7.26 TEJA PLÁSTICA No.6 M2 ### 45,700 45,700 45,700 45,700 45,700 45,700 45,700 45,700 45,700
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 83,082 83,082 83,082 83,082 83,082 83,082 83,082 83,082 83,082
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 152,713 152,713 152,713 152,713 152,713 152,713 152,713 152,713 152,713
7.29000000000001 TEJA SIN TRASLAPO M2 ### 68,914 68,914 68,914 68,914 68,914 68,914 68,914 68,914 68,914
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,362 44,362 44,362 44,362 44,362 44,362 44,362 44,362 44,362
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,573 34,573 34,573 34,573 34,573 34,573 34,573 34,573 34,573
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
7.32 ABIERTO 4"x2", 15 MM) M2 ### 59,499 59,499 59,499 59,499 59,499 59,499 59,499 59,499 59,499
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,911 20,911 20,911 20,911 20,911 20,911 20,911 20,911 20,911
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,994 24,994 24,994 24,994 24,994 24,994 24,994 24,994 24,994
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,959 26,959 26,959 26,959 26,959 26,959 26,959 26,959 26,959
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 34,496 34,496 34,496 34,496 34,496 34,496 34,496 34,496 34,496
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,973 22,973 22,973 22,973 22,973 22,973 22,973 22,973 22,973
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 53,979 53,979 53,979 53,979 53,979 53,979 53,979 53,979 53,979
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 360,324 360,324 360,324 360,324 360,324 360,324 360,324 360,324 360,324
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 424,628 424,628 424,628 424,628 424,628 424,628 424,628 424,628 424,628
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 276,693 276,693 276,693 276,693 276,693 276,693 276,693 276,693 276,693
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 294,806 294,806 294,806 294,806 294,806 294,806 294,806 294,806 294,806

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 431,121 436,237 425,275 438,429 431,853 433,313 435,506 434,044 422,352
8.2 CONCRETO 3500 PSI M3 ### 375,365 380,055 370,004 382,065 376,035 377,374 379,385 378,045 367,324
8.3 CONCRETO 3000 PSI M3 ### 372,697 377,518 367,186 379,584 373,386 374,763 376,829 375,452 364,432
8.4 CONCRETO 2500 PSI M3 ### 327,651 332,629 321,963 334,761 328,363 329,784 331,917 330,495 319,119
8.5 CONCRETO 2000 PSI M3 ### 303,109 308,177 297,317 310,348 303,833 305,280 307,452 306,005 294,422
8.6 CONCRETO 1500 PSI M3 ### 272,015 277,168 266,126 279,376 272,752 274,223 276,432 274,960 263,182
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
8.7 MORTERO SECO 1:10 M3 ###
p 200,976 203,218 198,415 204,178 201,297 201,937 202,897 202,257 197,135
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### i 418,506 420,683 416,019 421,615 418,817 419,439 420,372 419,750 414,776
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### o 375,056 377,313 372,476 378,280 375,378 376,023 376,991 376,346 371,186
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 440,005 442,116 437,592 443,021 440,307 440,910 441,815 441,212 436,386
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 668,185 670,296 665,772 671,201 668,487 669,090 669,995 669,392 664,566

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 126,385 126,385 126,385 126,385 126,385 126,385 126,385 126,385 126,385
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,786 3,803 3,768 3,810 3,789 3,793 3,800 3,796 3,758
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 142,022 142,022 142,022 142,022 142,022 142,022 142,022 142,022 142,022
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 173,259 173,259 173,259 173,259 173,259 173,259 173,259 173,259 173,259
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 249,302 249,302 249,302 249,302 249,302 249,302 249,302 249,302 249,302
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 277,324 277,324 277,324 277,324 277,324 277,324 277,324 277,324 277,324
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 305,380 305,380 305,380 305,380 305,380 305,380 305,380 305,380 305,380
9.8 HOJA PUERTA FORTEC 0.81 UN ### 202,440 202,440 202,440 202,440 202,440 202,440 202,440 202,440 202,440
9.9 HOJA PUERTA FORTEC 0.91 UN ### 229,386 229,386 229,386 229,386 229,386 229,386 229,386 229,386 229,386
9.10 HOJA PUERTA FORTEC 1.50 UN ### 337,172 337,172 337,172 337,172 337,172 337,172 337,172 337,172 337,172
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 128,337 128,337 128,337 128,337 128,337 128,337 128,337 128,337 128,337
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 170,104 170,104 170,104 170,104 170,104 170,104 170,104 170,104 170,104
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 188,967 188,967 188,967 188,967 188,967 188,967 188,967 188,967 188,967
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 479,989 479,989 479,989 479,989 479,989 479,989 479,989 479,989 479,989
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 43,386 43,386 43,386 43,386 43,386 43,386 43,386 43,386 43,386
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,371 27,371 27,371 27,371 27,371 27,371 27,371 27,371 27,371
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 102,628 102,628 102,628 102,628 102,628 102,628 102,628 102,628 102,628
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 123,015 123,015 123,015 123,015 123,015 123,015 123,015 123,015 123,015
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 95,665 95,665 95,665 95,665 95,665 95,665 95,665 95,665 95,665
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 29,969 29,969 29,969 29,969 29,969 29,969 29,969 29,969 29,969
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 29,969 29,969 29,969 29,969 29,969 29,969 29,969 29,969 29,969
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,433 28,433 28,433 28,433 28,433 28,433 28,433 28,433 28,433
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 43,610 43,610 43,610 43,610 43,610 43,610 43,610 43,610 43,610
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 53,816 53,816 53,816 53,816 53,816 53,816 53,816 53,816 53,816
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 64,702 64,702 64,702 64,702 64,702 64,702 64,702 64,702 64,702
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 77,630 77,630 77,630 77,630 77,630 77,630 77,630 77,630 77,630
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 363,297 363,297 363,297 363,297 363,297 363,297 363,297 363,297 363,297
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 254,434 254,434 254,434 254,434 254,434 254,434 254,434 254,434 254,434
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 34,765 34,765 34,765 34,765 34,765 34,765 34,765 34,765 34,765
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 44,291 44,291 44,291 44,291 44,291 44,291 44,291 44,291 44,291
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 53,816 53,816 53,816 53,816 53,816 53,816 53,816 53,816 53,816
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 67,424 67,424 67,424 67,424 67,424 67,424 67,424 67,424 67,424

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 78,236 78,236 78,236 78,236 78,236 78,236 78,236 78,236 78,236
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 215,077 215,077 215,077 215,077 215,077 215,077 215,077 215,077 215,077
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE
10.3 ANTICORROSIVO)
ML ### 83,224 83,224 83,224 83,224 83,224 83,224 83,224 83,224 83,224
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 150,313 150,313 150,313 150,313 150,313 150,313 150,313 150,313 150,313
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 140,711 140,711 140,711 140,711 140,711 140,711 140,711 140,711 140,711
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 92,411 92,411 92,411 92,411 92,411 92,411 92,411 92,411 92,411
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 217,055 217,055 217,055 217,055 217,055 217,055 217,055 217,055 217,055
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 113,492 113,492 113,492 113,492 113,492 113,492 113,492 113,492 113,492
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,834 6,834 6,834 6,834 6,834 6,834 6,834 6,834 6,834
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO
10.10 ESTRUCTURAL GALVANIZADO 2")
M2 ### 103,936 103,936 103,936 103,936 103,936 103,936 103,936 103,936 103,936

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00


10,10(1) MTS
M2 ### 124,018 124,018 124,018 124,018 124,018 124,018 124,018 124,018 124,018
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ###
p 42,754 42,754 42,754 42,754 42,754 42,754 42,754 42,754 42,754
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### i 547,364 547,364 547,364 547,364 547,364 547,364 547,364 547,364 547,364
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### o 197,708 197,708 197,708 197,708 197,708 197,708 197,708 197,708 197,708
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### 223,445 223,445 223,445 223,445 223,445 223,445 223,445 223,445 223,445

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y


10.15 ACCESORIOS)
M2 ### 500,051 500,051 500,051 500,051 500,051 500,051 500,051 500,051 500,051
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 133,613 133,613 133,613 133,613 133,613 133,613 133,613 133,613 133,613
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 398,709 398,709 398,709 398,709 398,709 398,709 398,709 398,709 398,709
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,233 6,233 6,233 6,233 6,233 6,233 6,233 6,233 6,233
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 281,442 281,442 281,442 281,442 281,442 281,442 281,442 281,442 281,442
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 126,881 126,881 126,881 126,881 126,881 126,881 126,881 126,881 126,881
10.21 REJILLA PISO 0.30 M M2 ### 88,563 88,563 88,563 88,563 88,563 88,563 88,563 88,563 88,563
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 91,656 91,656 91,656 91,656 91,656 91,656 91,656 91,656 91,656
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
10.23 TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN,
KG ### 10,956 10,956 10,956 10,956 10,956 10,956 10,956 10,956 10,956
SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
KG ### 12,124 12,124 12,124 12,124 12,124 12,124 12,124 12,124 12,124
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,698 9,698 9,698 9,698 9,698 9,698 9,698 9,698 9,698
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 229,860 229,860 229,860 229,860 229,860 229,860 229,860 229,860 229,860
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 275,840 275,840 275,840 275,840 275,840 275,840 275,840 275,840 275,840
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,820 22,820 22,820 22,820 22,820 22,820 22,820 22,820 22,820
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,734 35,734 35,734 35,734 35,734 35,734 35,734 35,734 35,734
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,443 34,443 34,443 34,443 34,443 34,443 34,443 34,443 34,443
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,004 44,004 44,004 44,004 44,004 44,004 44,004 44,004 44,004
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 90,298 90,298 90,298 90,298 90,298 90,298 90,298 90,298 90,298
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 231,235 231,235 231,235 231,235 231,235 231,235 231,235 231,235 231,235
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,888 46,888 46,888 46,888 46,888 46,888 46,888 46,888 46,888
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 36,502 36,502 36,502 36,502 36,502 36,502 36,502 36,502 36,502
11.13 NIPLE PASAMURO 2" UN ### 69,984 69,984 69,984 69,984 69,984 69,984 69,984 69,984 69,984
11.14 NIPLE PASAMURO 4" UN ### 104,403 104,403 104,403 104,403 104,403 104,403 104,403 104,403 104,403
11.15 PUNTO AGUA CALIENTE CPVC UN ### 87,562 87,562 87,562 87,562 87,562 87,562 87,562 87,562 87,562
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 64,603 64,603 64,603 64,603 64,603 64,603 64,603 64,603 64,603
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 68,548 68,548 68,548 68,548 68,548 68,548 68,548 68,548 68,548
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 86,582 86,582 86,582 86,582 86,582 86,582 86,582 86,582 86,582
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 69,314 69,314 69,314 69,314 69,314 69,314 69,314 69,314 69,314
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 86,146 86,146 86,146 86,146 86,146 86,146 86,146 86,146 86,146
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 91,978 91,978 91,978 91,978 91,978 91,978 91,978 91,978 91,978
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 75,588 75,588 75,588 75,588 75,588 75,588 75,588 75,588 75,588
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,873 12,873 12,873 12,873 12,873 12,873 12,873 12,873 12,873
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,010 18,010 18,010 18,010 18,010 18,010 18,010 18,010 18,010
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,539 23,539 23,539 23,539 23,539 23,539 23,539 23,539 23,539
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
11.26 RED SUMINISTRO PVC 1" ML ###
p 14,610 14,610 14,610 14,610 14,610 14,610 14,610 14,610 14,610
11.27 RED SUMINISTRO PVC 1/2" ML ### i 8,775 8,775 8,775 8,775 8,775 8,775 8,775 8,775 8,775
11.28 RED SUMINISTRO PVC 2 1/2" ML ### o 52,150 52,150 52,150 52,150 52,150 52,150 52,150 52,150 52,150
11.29 RED SUMINISTRO PVC 2" ML ### 33,453 33,453 33,453 33,453 33,453 33,453 33,453 33,453 33,453
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,956 10,956 10,956 10,956 10,956 10,956 10,956 10,956 10,956
11.31 RED SANITARIA PVC-S 2" ML ### 25,947 25,947 25,947 25,947 25,947 25,947 25,947 25,947 25,947
11.32 RED SANITARIA PVC-S 3" ML ### 35,911 35,911 35,911 35,911 35,911 35,911 35,911 35,911 35,911
11.33 RED SANITARIA PVC-S 4" ML ### 48,673 48,673 48,673 48,673 48,673 48,673 48,673 48,673 48,673
11.34 RED SANITARIA PVC-S 6" ML ### 90,381 90,381 90,381 90,381 90,381 90,381 90,381 90,381 90,381
11.35 REGISTRO 1" UN ### 110,308 110,308 110,308 110,308 110,308 110,308 110,308 110,308 110,308
11.36 REGISTRO 1/2" UN ### 61,588 61,588 61,588 61,588 61,588 61,588 61,588 61,588 61,588
11.37 REGISTRO 3/4" UN ### 78,186 78,186 78,186 78,186 78,186 78,186 78,186 78,186 78,186
11.38 REGISTRO 1 1/2" UN ### 188,183 188,183 188,183 188,183 188,183 188,183 188,183 188,183 188,183
11.39 REGISTRO 2 1/2" UN ### 386,971 386,971 386,971 386,971 386,971 386,971 386,971 386,971 386,971
11.40 REGISTRO 2" UN ### 286,347 286,347 286,347 286,347 286,347 286,347 286,347 286,347 286,347
11.41 REVENTILACIÓN 2" ML ### 18,153 18,153 18,153 18,153 18,153 18,153 18,153 18,153 18,153
11.42 REVENTILACIÓN 3" ML ### 22,886 22,886 22,886 22,886 22,886 22,886 22,886 22,886 22,886
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 177,886 177,886 177,886 177,886 177,886 177,886 177,886 177,886 177,886

11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 288,559 288,559 288,559 288,559 288,559 288,559 288,559 288,559 288,559

11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 479,456 479,456 479,456 479,456 479,456 479,456 479,456 479,456 479,456

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11.46 SOPORTES)
ML ### 41,318 41,318 41,318 41,318 41,318 41,318 41,318 41,318 41,318

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.47 SOPORTES) ML ### 48,703 48,703 48,703 48,703 48,703 48,703 48,703 48,703 48,703

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.48 SOPORTES)
ML ### 62,828 62,828 62,828 62,828 62,828 62,828 62,828 62,828 62,828

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.49 SOPORTES)
ML ### 70,999 70,999 70,999 70,999 70,999 70,999 70,999 70,999 70,999

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y


11.50 SOPORTES)
ML ### 91,456 91,456 91,456 91,456 91,456 91,456 91,456 91,456 91,456
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11.51 SOPORTES)
ML ### 106,514 106,514 106,514 106,514 106,514 106,514 106,514 106,514 106,514
TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
11.52 SOPORTES)
ML ### 157,669 157,669 157,669 157,669 157,669 157,669 157,669 157,669 157,669
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 63,936 63,936 63,936 63,936 63,936 63,936 63,936 63,936 63,936
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,191 64,191 64,191 64,191 64,191 64,191 64,191 64,191 64,191
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,033 41,033 41,033 41,033 41,033 41,033 41,033 41,033 41,033
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 50,411 50,411 50,411 50,411 50,411 50,411 50,411 50,411 50,411
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,243 4,243 4,243 4,243 4,243 4,243 4,243 4,243 4,243

11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,671 6,671 6,671 6,671 6,671 6,671 6,671 6,671 6,671
11.59 GABINETE TIPO III UN ### 1,033,932 1,033,932 1,033,932 1,033,932 1,033,932 1,033,932 1,033,932 1,033,932 1,033,932
11.60 GABINETE TIPO I UN ### 791,683 791,683 791,683 791,683 791,683 791,683 791,683 791,683 791,683
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,644,230 2,644,230 2,644,230 2,644,230 2,644,230 2,644,230 2,644,230 2,644,230 2,644,230
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,205,993 2,205,993 2,205,993 2,205,993 2,205,993 2,205,993 2,205,993 2,205,993 2,205,993
11.63 VÁLVULA MARIPOSA 3" UN ### 646,091 646,091 646,091 646,091 646,091 646,091 646,091 646,091 646,091
11.64 VÁLVULA MARIPOSA 4" UN ### 833,639 833,639 833,639 833,639 833,639 833,639 833,639 833,639 833,639
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 318,467 318,467 318,467 318,467 318,467 318,467 318,467 318,467 318,467

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 371,624 371,624 371,624 371,624 371,624 371,624 371,624 371,624 371,624
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,029 59,029 59,029 59,029 59,029 59,029 59,029 59,029 59,029
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ###
p 69,757 69,757 69,757 69,757 69,757 69,757 69,757 69,757 69,757
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### i 77,596 77,596 77,596 77,596 77,596 77,596 77,596 77,596 77,596
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### o 91,235 91,235 91,235 91,235 91,235 91,235 91,235 91,235 91,235
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 55,569 55,569 55,569 55,569 55,569 55,569 55,569 55,569 55,569
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 63,278 63,278 63,278 63,278 63,278 63,278 63,278 63,278 63,278
12.8 STRIP TELEFÓNICO 10 PARES UN ### 146,900 146,900 146,900 146,900 146,900 146,900 146,900 146,900 146,900
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 57,008 57,008 57,008 57,008 57,008 57,008 57,008 57,008 57,008
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 130,846 130,846 130,846 130,846 130,846 130,846 130,846 130,846 130,846
12.11 SALIDA T.V PVC COMPLETA. UN ### 78,382 78,382 78,382 78,382 78,382 78,382 78,382 78,382 78,382
12.12 SALIDA BIFÁSICA C.N. UN ### 46,463 46,463 46,463 46,463 46,463 46,463 46,463 46,463 46,463
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 98,298 98,298 98,298 98,298 98,298 98,298 98,298 98,298 98,298
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 420,083 420,083 420,083 420,083 420,083 420,083 420,083 420,083 420,083
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 558,766 558,766 558,766 558,766 558,766 558,766 558,766 558,766 558,766
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,615 3,615 3,615 3,615 3,615 3,615 3,615 3,615 3,615
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,778 4,778 4,778 4,778 4,778 4,778 4,778 4,778 4,778
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,422 7,422 7,422 7,422 7,422 7,422 7,422 7,422 7,422
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,285 13,285 13,285 13,285 13,285 13,285 13,285 13,285 13,285
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 278,748 278,748 278,748 278,748 278,748 278,748 278,748 278,748 278,748
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 79,026 79,026 79,026 79,026 79,026 79,026 79,026 79,026 79,026
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 106,536 106,536 106,536 106,536 106,536 106,536 106,536 106,536 106,536
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,222 44,222 44,222 44,222 44,222 44,222 44,222 44,222 44,222
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,433,998 1,433,998 1,433,998 1,433,998 1,433,998 1,433,998 1,433,998 1,433,998 1,433,998
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,062,779 1,062,779 1,062,779 1,062,779 1,062,779 1,062,779 1,062,779 1,062,779 1,062,779
12.26 POSTE METÁLICO 6M UN ### 1,315,887 1,315,887 1,315,887 1,315,887 1,315,887 1,315,887 1,315,887 1,315,887 1,315,887
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 610,724 610,724 610,724 610,724 610,724 610,724 610,724 610,724 610,724
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 112,463 112,463 112,463 112,463 112,463 112,463 112,463 112,463 112,463
12.29 LUMINARIA 70W SODIO UN ### 512,115 512,115 512,115 512,115 512,115 512,115 512,115 512,115 512,115
12.30 LUMINARIA 150W SODIO UN ### 640,281 640,281 640,281 640,281 640,281 640,281 640,281 640,281 640,281
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,688,490 1,688,490 1,688,490 1,688,490 1,688,490 1,688,490 1,688,490 1,688,490 1,688,490
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,243,870 1,243,870 1,243,870 1,243,870 1,243,870 1,243,870 1,243,870 1,243,870 1,243,870

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 39,362 39,444 39,270 39,478 39,374 39,397 39,432 39,409 39,223
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 38,730 38,811 38,637 38,846 38,741 38,764 38,799 38,776 38,590
13.3 ALISTADO PARA LISTÓN M2 ### 15,066 15,083 15,048 15,090 15,069 15,073 15,080 15,076 15,039
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 25,330 25,493 25,145 25,562 25,353 25,400 25,469 25,423 25,052
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 83,322 83,484 83,136 83,554 83,345 83,391 83,461 83,415 83,043
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,460 27,562 27,344 27,605 27,475 27,504 27,547 27,518 27,287
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 56,769 57,267 56,200 57,480 56,840 56,982 57,196 57,053 55,916
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 77,665 78,462 76,755 78,803 77,779 78,007 78,348 78,120 76,300
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,291 31,291 31,291 31,291 31,291 31,291 31,291 31,291 31,291
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,988 23,988 23,988 23,988 23,988 23,988 23,988 23,988 23,988
13.11 PERMA PLY 2 CAPAS M2 ### 28,258 28,258 28,258 28,258 28,258 28,258 28,258 28,258 28,258
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 45,831 46,279 45,319 46,471 45,895 46,023 46,215 46,087 45,063
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 53,488 54,036 52,862 54,270 53,566 53,723 53,957 53,801 52,549
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 76,983 77,829 76,016 78,191 77,104 77,345 77,708 77,466 75,532
13.15 TRITURADO FINO 1/2 M3 ### 78,680 82,175 74,686 83,673 79,180 80,178 81,676 80,677 72,690
13.16 TRITURADO GRUESO 3/4 M3 ### 89,784 93,897 85,992 94,523 91,053 93,195 90,637 91,679 84,096

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 58,526 58,559 58,489 58,573 58,531 58,540 58,554 58,545 58,470
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,274 35,290 35,255 35,297 35,276 35,281 35,287 35,283 35,246
14.3 ADOQUÍN CONCRETO 6CM M2 ### 65,950 66,031 65,857 66,066 65,962 65,985 66,020 65,996 65,811
14.4 ADOQUÍN CONCRETO 8CM M2 ### 69,300 69,381 69,207 69,416 69,312 69,335 69,370 69,346 69,161
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
14.5 ADOQUÍN GRES PEATONAL M2 ###
p 73,715 73,796 73,622 73,831 73,727 73,750 73,785 73,762 73,576
M2 ### i
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
14.6 INCLUYE ALISTADO 76,936 76,969 76,899 76,982 76,941 76,950 76,964 76,955 76,880
o
14.7 GRAVILLA PARA GRADAS ML ### 39,194 39,247 39,133 39,269 39,201 39,216 39,239 39,224 39,103
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 165,434 165,580 165,267 165,643 165,455 165,497 165,559 165,518 165,184
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 47,855 47,977 47,715 48,029 47,872 47,907 47,959 47,925 47,645
14.10 GUARDAESCOBA EN GRANITO ML ### 46,187 46,187 46,187 46,187 46,187 46,187 46,187 46,187 46,187
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,317 10,370 10,256 10,392 10,324 10,339 10,362 10,347 10,226
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,615 9,615 9,615 9,615 9,615 9,615 9,615 9,615 9,615
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,880 12,880 12,880 12,880 12,880 12,880 12,880 12,880 12,880
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,979 10,979 10,979 10,979 10,979 10,979 10,979 10,979 10,979
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,194 18,194 18,194 18,194 18,194 18,194 18,194 18,194 18,194
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,170 35,170 35,170 35,170 35,170 35,170 35,170 35,170 35,170
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,816 9,816 9,816 9,816 9,816 9,816 9,816 9,816 9,816
14.18 LISTÓN M.H. AMARILLO M2 ### 77,295 77,295 77,295 77,295 77,295 77,295 77,295 77,295 77,295
14.19 PASO ESCALERA GRANITO ML ### 121,062 121,176 120,933 121,225 121,079 121,111 121,160 121,127 120,868
14.20 PIRLANES ALUMINIO ML ### 8,080 8,080 8,080 8,080 8,080 8,080 8,080 8,080 8,080
14.21 PIRLANES LADRILLO ML ### 33,063 33,095 33,025 33,109 33,067 33,076 33,090 33,081 33,007
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 47,280 47,280 47,280 47,280 47,280 47,280 47,280 47,280 47,280
14.23 PISO VINILO TRÁFICO PESADO M2 ### 54,809 54,809 54,809 54,809 54,809 54,809 54,809 54,809 54,809
14.24 PULIDA LACADA PISO MADERA M2 ### 51,346 51,346 51,346 51,346 51,346 51,346 51,346 51,346 51,346
14.25 TABLETA DE GRES 25X25 M2 ### 50,763 50,795 50,726 50,809 50,767 50,777 50,791 50,781 50,707
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 56,925 56,958 56,888 56,972 56,930 56,939 56,953 56,944 56,870
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,571 11,571 11,571 11,571 11,571 11,571 11,571 11,571 11,571
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 50,542 50,590 50,486 50,611 50,549 50,563 50,583 50,569 50,458
14.29 JABONERA PORCELANA ACUARIO UN ### 21,284 21,284 21,284 21,284 21,284 21,284 21,284 21,284 21,284
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
14.30 Y PERCHA SIMPLE) UN ### 126,834 126,834 126,834 126,834 126,834 126,834 126,834 126,834 126,834
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,531 10,531 10,531 10,531 10,531 10,531 10,531 10,531 10,531
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,306 23,306 23,306 23,306 23,306 23,306 23,306 23,306 23,306
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,112 15,112 15,112 15,112 15,112 15,112 15,112 15,112 15,112
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,694 14,694 14,694 14,694 14,694 14,694 14,694 14,694 14,694
14.35 REMATES BOCEL ALUMINIO ML ### 9,089 9,089 9,089 9,089 9,089 9,089 9,089 9,089 9,089
14.36 REMATES BOCEL PORCELANA ML ### 9,242 9,242 9,242 9,242 9,242 9,242 9,242 9,242 9,242
14.37 TAPA REGISTRO 20X20 UN ### 19,814 19,814 19,814 19,814 19,814 19,814 19,814 19,814 19,814
14.38 TAPA REGISTRO 6X6 UN ### 18,095 18,095 18,095 18,095 18,095 18,095 18,095 18,095 18,095
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,997 18,997 18,997 18,997 18,997 18,997 18,997 18,997 18,997
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN
14.40 SITIO
M2 ### 21,961 21,961 21,961 21,961 21,961 21,961 21,961 21,961 21,961
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 66,572 66,605 66,535 66,619 66,577 66,586 66,600 66,591 66,517
14.42 MEDIA CAÑA EN GRANITO ML ### 79,250 79,250 79,250 79,250 79,250 79,250 79,250 79,250 79,250
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,535 36,535 36,535 36,535 36,535 36,535 36,535 36,535 36,535
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,821 13,821 13,821 13,821 13,821 13,821 13,821 13,821 13,821
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 103,630 103,630 103,630 103,630 103,630 103,630 103,630 103,630 103,630
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 125,837 125,837 125,837 125,837 125,837 125,837 125,837 125,837 125,837

15 CIELO RASO
15.1 APLIQUE YESO ML ### 74,521 74,521 74,521 74,521 74,521 74,521 74,521 74,521 74,521
15.2 ARMADURA MADERA Y MALLA M2 ### 38,057 38,057 38,057 38,057 38,057 38,057 38,057 38,057 38,057
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 57,720 57,720 57,720 57,720 57,720 57,720 57,720 57,720 57,720
15.4 CIELO RASO DURACUSTIC M2 ### 70,507 70,507 70,507 70,507 70,507 70,507 70,507 70,507 70,507
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 52,750 52,750 52,750 52,750 52,750 52,750 52,750 52,750 52,750
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 97,224 97,224 97,224 97,224 97,224 97,224 97,224 97,224 97,224
15.7 CORNISAS YESO ML ### 49,935 49,935 49,935 49,935 49,935 49,935 49,935 49,935 49,935
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 107,156 107,156 107,156 107,156 107,156 107,156 107,156 107,156 107,156
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
15.9 MALLA CON VENA M2 ###
p 14,225 14,225 14,225 14,225 14,225 14,225 14,225 14,225 14,225
i
16 EXCAVACIONES Y RELLENOS o
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
16.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 76,205 79,720 76,205 76,205 79,720 84,993 67,417 76,205 76,205
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 88,588 92,629 83,970 94,360 89,165 90,320 92,052 90,898 81,661
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 117,804 116,046 145,925 140,653 165,259 126,592 119,561 128,349 168,774
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 62,830 68,875 65,360 65,360 68,875 74,148 56,572 60,087 65,360
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 109,146 107,388 137,267 131,994 156,601 117,934 110,903 119,691 126,722
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 114,238 112,480 142,359 137,087 161,693 123,026 115,995 124,783 165,208

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 309,617 309,617 309,617 309,617 309,617 309,617 309,617 309,617 309,617
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 907,712 907,712 907,712 907,712 907,712 907,712 907,712 907,712 907,712
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 492,910 492,910 492,910 492,910 492,910 492,910 492,910 492,910 492,910
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 145,126 145,126 145,126 145,126 145,126 145,126 145,126 145,126 145,126
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 201,696 201,696 201,696 201,696 201,696 201,696 201,696 201,696 201,696

17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 187,509 187,509 187,509 187,509 187,509 187,509 187,509 187,509 187,509
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 409,510 409,510 409,510 409,510 409,510 409,510 409,510 409,510 409,510
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 1,043,443 1,043,443 1,043,443 1,043,443 1,043,443 1,043,443 1,043,443 1,043,443 1,043,443
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 298,221 298,221 298,221 298,221 298,221 298,221 298,221 298,221 298,221
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 212,358 212,358 212,358 212,358 212,358 212,358 212,358 212,358 212,358
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 86,017 86,017 86,017 86,017 86,017 86,017 86,017 86,017 86,017
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 256,185 256,185 256,185 256,185 256,185 256,185 256,185 256,185 256,185

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO


17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 376,097 376,097 376,097 376,097 376,097 376,097 376,097 376,097 376,097

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,732 8,732 8,732 8,732 8,732 8,732 8,732 8,732 8,732
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,216 3,216 3,216 3,216 3,216 3,216 3,216 3,216 3,216
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,737 11,737 11,737 11,737 11,737 11,737 11,737 11,737 11,737
18.4 BARNIZ SOBRE MUEBLES M2 ### 43,984 43,984 43,984 43,984 43,984 43,984 43,984 43,984 43,984
18.5 CARBURO SOBRE PAÑETES M2 ### 6,145 6,145 6,145 6,145 6,145 6,145 6,145 6,145 6,145
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 67,048 67,048 67,048 67,048 67,048 67,048 67,048 67,048 67,048
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,672 3,672 3,672 3,672 3,672 3,672 3,672 3,672 3,672
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,894 2,894 2,894 2,894 2,894 2,894 2,894 2,894 2,894
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,608 14,608 14,608 14,608 14,608 14,608 14,608 14,608 14,608
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,217 4,217 4,217 4,217 4,217 4,217 4,217 4,217 4,217
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,396 15,396 15,396 15,396 15,396 15,396 15,396 15,396 15,396
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,932 5,932 5,932 5,932 5,932 5,932 5,932 5,932 5,932
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
18.13 ESMALTE SOBRE MARCOS MADERA M2 ###
p 6,771 6,771 6,771 6,771 6,771 6,771 6,771 6,771 6,771
18.14 ESTUCO M2 ### i 7,420 7,420 7,420 7,420 7,420 7,420 7,420 7,420 7,420
18.15 ESTUCO (LINEAL) ML ### o 4,659 4,659 4,659 4,659 4,659 4,659 4,659 4,659 4,659
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,287 16,287 16,287 16,287 16,287 16,287 16,287 16,287 16,287
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,135 10,135 10,135 10,135 10,135 10,135 10,135 10,135 10,135
18.18 LACA PISOS MADERA M2 ### 24,047 24,047 24,047 24,047 24,047 24,047 24,047 24,047 24,047
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,826 2,826 2,826 2,826 2,826 2,826 2,826 2,826 2,826
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,600 12,600 12,600 12,600 12,600 12,600 12,600 12,600 12,600
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,406 3,406 3,406 3,406 3,406 3,406 3,406 3,406 3,406
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,183 13,183 13,183 13,183 13,183 13,183 13,183 13,183 13,183
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,429 7,429 7,429 7,429 7,429 7,429 7,429 7,429 7,429
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,619 22,619 22,619 22,619 22,619 22,619 22,619 22,619 22,619
18.26 PINTURA EPÓXICA M2 ### 13,346 13,346 13,346 13,346 13,346 13,346 13,346 13,346 13,346
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,273 8,273 8,273 8,273 8,273 8,273 8,273 8,273 8,273

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,165,398 6,165,398 6,165,398 6,165,398 6,165,398 6,165,398 6,165,398 6,165,398 6,165,398
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y
19.2 CILINDRO PARA MOVILIZAR (PAR)
UN ### 10,893,368 10,893,368 10,893,368 10,893,368 10,893,368 10,893,368 10,893,368 10,893,368 10,893,368
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,851,109 2,851,109 2,851,109 2,851,109 2,851,109 2,851,109 2,851,109 2,851,109 2,851,109
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,316,899 9,316,899 9,316,899 9,316,899 9,316,899 9,316,899 9,316,899 9,316,899 9,316,899
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,723,455 8,723,455 8,723,455 8,723,455 8,723,455 8,723,455 8,723,455 8,723,455 8,723,455
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,826 2,826 2,826 2,826 2,826 2,826 2,826 2,826 2,826
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 876,584 876,584 876,584 876,584 876,584 876,584 876,584 876,584 876,584
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 87,366 87,366 87,366 87,366 87,366 87,366 87,366 87,366 87,366
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,583,524 1,583,575 1,583,466 1,583,597 1,583,532 1,583,546 1,583,568 1,583,554 1,583,437
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 683,705 684,910 682,327 685,427 683,877 684,221 684,738 684,394 681,639

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,129 30,129 30,129 30,129 30,129 30,129 30,129 30,129 30,129
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,659 44,659 44,659 44,659 44,659 44,659 44,659 44,659 44,659
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 55,337 55,337 55,337 55,337 55,337 55,337 55,337 55,337 55,337
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,151 18,151 18,151 18,151 18,151 18,151 18,151 18,151 18,151
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,966 21,966 21,966 21,966 21,966 21,966 21,966 21,966 21,966
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 29,906 29,906 29,906 29,906 29,906 29,906 29,906 29,906 29,906
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,866 26,866 26,866 26,866 26,866 26,866 26,866 26,866 26,866
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,332 28,332 28,332 28,332 28,332 28,332 28,332 28,332 28,332
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,395 35,395 35,395 35,395 35,395 35,395 35,395 35,395 35,395
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,100 18,100 18,100 18,100 18,100 18,100 18,100 18,100 18,100
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,683 23,683 23,683 23,683 23,683 23,683 23,683 23,683 23,683
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,340 36,340 36,340 36,340 36,340 36,340 36,340 36,340 36,340
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 277,431 277,431 277,431 277,431 277,431 277,431 277,431 277,431 277,431
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 319,214 319,214 319,214 319,214 319,214 319,214 319,214 319,214 319,214
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 333,056 333,056 333,056 333,056 333,056 333,056 333,056 333,056 333,056
20.16 ACOMETIDA GAS 1/2" ML ### 309,693 309,693 309,693 309,693 309,693 309,693 309,693 309,693 309,693

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 226,191 226,191 226,191 226,191 226,191 226,191 226,191 226,191 226,191
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 34,541 34,541 34,541 34,541 34,541 34,541 34,541 34,541 34,541
21.3 SIRENA DE 110 V UN ### 106,010 106,010 106,010 106,010 106,010 106,010 106,010 106,010 106,010
21.4 CÁMARA CCTV UN ### 272,468 272,468 272,468 272,468 272,468 272,468 272,468 272,468 272,468
21.5 PARLANTE-CIELO FALSO UN ### 53,720 53,720 53,720 53,720 53,720 53,720 53,720 53,720 53,720
21.6 AMPLIFICADOR 100W UN ### 586,568 586,568 586,568 586,568 586,568 586,568 586,568 586,568 586,568
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
21.7 AMPLIFICADOR 300W UN ###
p 1,447,239 1,447,239 1,447,239 1,447,239 1,447,239 1,447,239 1,447,239 1,447,239 1,447,239
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### i 47,573 47,573 47,573 47,573 47,573 47,573 47,573 47,573 47,573
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### o 225,821 225,821 225,821 225,821 225,821 225,821 225,821 225,821 225,821
21.10 TOMA PARA MICRÓFONO UN ### 45,701 45,701 45,701 45,701 45,701 45,701 45,701 45,701 45,701
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,865 3,865 3,865 3,865 3,865 3,865 3,865 3,865 3,865
21.12 SPLITERS UN ### 6,441 6,441 6,441 6,441 6,441 6,441 6,441 6,441 6,441
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,593 19,593 19,593 19,593 19,593 19,593 19,593 19,593 19,593
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,589 25,589 25,589 25,589 25,589 25,589 25,589 25,589 25,589
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,180 33,180 33,180 33,180 33,180 33,180 33,180 33,180 33,180
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 125,485 125,485 125,485 125,485 125,485 125,485 125,485 125,485 125,485
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 32,758 32,758 32,758 32,758 32,758 32,758 32,758 32,758 32,758
21.18 BANDEJA PORTACABLES PARA RACK UN ### 106,750 106,750 106,750 106,750 106,750 106,750 106,750 106,750 106,750
21.19 RACK 2' X 24" UN ### 191,128 191,128 191,128 191,128 191,128 191,128 191,128 191,128 191,128
21.20 RACK 3' X 24" UN ### 297,566 297,566 297,566 297,566 297,566 297,566 297,566 297,566 297,566
21.21 RACK 5' X 24" UN ### 370,900 370,900 370,900 370,900 370,900 370,900 370,900 370,900 370,900
21.22 RACK 7' X 24" UN ### 404,583 404,583 404,583 404,583 404,583 404,583 404,583 404,583 404,583
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 596,423 596,423 596,423 596,423 596,423 596,423 596,423 596,423 596,423
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 352,480 352,480 352,480 352,480 352,480 352,480 352,480 352,480 352,480
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 106,391 106,391 106,391 106,391 106,391 106,391 106,391 106,391 106,391
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,111 14,111 14,111 14,111 14,111 14,111 14,111 14,111 14,111
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 28,796 28,796 28,796 28,796 28,796 28,796 28,796 28,796 28,796
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,170 5,170 5,170 5,170 5,170 5,170 5,170 5,170 5,170
21.29 CANALETA METÁLICA 4X6 CMS ML ### 36,606 36,606 36,606 36,606 36,606 36,606 36,606 36,606 36,606
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,212 38,212 38,212 38,212 38,212 38,212 38,212 38,212 38,212
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,014 39,014 39,014 39,014 39,014 39,014 39,014 39,014 39,014
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,468 25,468 25,468 25,468 25,468 25,468 25,468 25,468 25,468
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,109 28,109 28,109 28,109 28,109 28,109 28,109 28,109 28,109
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,219 29,219 29,219 29,219 29,219 29,219 29,219 29,219 29,219
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 48,722 48,722 48,722 48,722 48,722 48,722 48,722 48,722 48,722
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 627,662 627,662 627,662 627,662 627,662 627,662 627,662 627,662 627,662
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 323,551 323,551 323,551 323,551 323,551 323,551 323,551 323,551 323,551
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 92,195 92,195 92,195 92,195 92,195 92,195 92,195 92,195 92,195
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,904 1,904 1,904 1,904 1,904 1,904 1,904 1,904 1,904
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,771 8,771 8,771 8,771 8,771 8,771 8,771 8,771 8,771
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,005 13,005 13,005 13,005 13,005 13,005 13,005 13,005 13,005
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,644 21,644 21,644 21,644 21,644 21,644 21,644 21,644 21,644
21.43 CABLE TELEVISIÓN RG6 ML ### 4,039 4,039 4,039 4,039 4,039 4,039 4,039 4,039 4,039
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,582 23,582 23,582 23,582 23,582 23,582 23,582 23,582 23,582
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,112 34,112 34,112 34,112 34,112 34,112 34,112 34,112 34,112
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,203 20,203 20,203 20,203 20,203 20,203 20,203 20,203 20,203
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,884 15,884 15,884 15,884 15,884 15,884 15,884 15,884 15,884
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 630,620 630,620 630,620 630,620 630,620 630,620 630,620 630,620 630,620
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
p URBANISMO
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 27,745 27,745 27,745 27,745 27,745 27,745 27,745 27,745 27,745
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 92,399 92,399 92,399 92,399 92,399 92,399 92,399 92,399 92,399
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 518,807 518,807 518,807 518,807 518,807 518,807 518,807 518,807 518,807
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,107,221 1,107,221 1,107,221 1,107,221 1,107,221 1,107,221 1,107,221 1,107,221 1,107,221
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 127,164 127,164 127,164 127,164 127,164 127,164 127,164 127,164 127,164
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 772,837 772,837 772,837 772,837 772,837 772,837 772,837 772,837 772,837
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,662,216 1,662,216 1,662,216 1,662,216 1,662,216 1,662,216 1,662,216 1,662,216 1,662,216
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,599 13,599 13,599 13,599 13,599 13,599 13,599 13,599 13,599
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,693 16,693 16,693 16,693 16,693 16,693 16,693 16,693 16,693
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,874 20,874 20,874 20,874 20,874 20,874 20,874 20,874 20,874
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,814 22,814 22,814 22,814 22,814 22,814 22,814 22,814 22,814
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,283 27,283 27,283 27,283 27,283 27,283 27,283 27,283 27,283
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,283 27,283 27,283 27,283 27,283 27,283 27,283 27,283 27,283
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 108,571 108,571 108,571 108,571 108,571 108,571 108,571 108,571 108,571
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 125,803 125,803 125,803 125,803 125,803 125,803 125,803 125,803 125,803
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 389,119 389,119 389,119 389,119 389,119 389,119 389,119 389,119 389,119
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 146,054 146,054 146,054 146,054 146,054 146,054 146,054 146,054 146,054
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 240,773 240,773 240,773 240,773 240,773 240,773 240,773 240,773 240,773
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,064,399 1,064,399 1,064,399 1,064,399 1,064,399 1,064,399 1,064,399 1,064,399 1,064,399
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,226,213 1,226,213 1,226,213 1,226,213 1,226,213 1,226,213 1,226,213 1,226,213 1,226,213
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,637 14,637 14,637 14,637 14,637 14,637 14,637 14,637 14,637
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,946 12,946 12,946 12,946 12,946 12,946 12,946 12,946 12,946
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,360 31,360 31,360 31,360 31,360 31,360 31,360 31,360 31,360
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 125,150 125,150 125,150 125,150 125,150 125,150 125,150 125,150 125,150
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 185,939 185,939 185,939 185,939 185,939 185,939 185,939 185,939 185,939
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,594 30,594 30,594 30,594 30,594 30,594 30,594 30,594 30,594
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 105,059 105,059 105,059 105,059 105,059 105,059 105,059 105,059 105,059
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 155,260 155,260 155,260 155,260 155,260 155,260 155,260 155,260 155,260
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 30,830 30,830 30,830 30,830 30,830 30,830 30,830 30,830 30,830
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 63,464 63,464 63,464 63,464 63,464 63,464 63,464 63,464 63,464
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 254,722 254,722 254,722 254,722 254,722 254,722 254,722 254,722 254,722
1.32 UNIÓN REPARACION PVC 4" UN ### 73,974 73,974 73,974 73,974 73,974 73,974 73,974 73,974 73,974
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 296,220 296,220 296,220 296,220 296,220 296,220 296,220 296,220 296,220
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 178,646 178,646 178,646 178,646 178,646 178,646 178,646 178,646 178,646
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 505,567 505,567 505,567 505,567 505,567 505,567 505,567 505,567 505,567
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,350,534 1,350,534 1,350,534 1,350,534 1,350,534 1,350,534 1,350,534 1,350,534 1,350,534
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 1,995,403 1,995,403 1,995,403 1,995,403 1,995,403 1,995,403 1,995,403 1,995,403 1,995,403

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,275 11,275 11,275 11,275 11,275 11,275 11,275 11,275 11,275
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,829 25,829 25,829 25,829 25,829 25,829 25,829 25,829 25,829
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 69,606 73,464 65,198 75,117 70,158 71,260 72,913 71,811 62,995
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 70,913 74,429 70,913 70,913 74,429 79,701 62,125 70,913 70,913
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 68,384 74,429 70,913 70,913 74,429 79,701 62,125 65,641 70,913
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 53,182 65,203 54,207 60,356 63,430 60,356 53,182 59,331 78,738
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 60,371 68,729 56,192 62,460 65,594 62,460 55,147 61,415 54,102
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 52,425 54,536 50,012 55,441 52,726 53,330 54,234 53,631 48,806

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 116,043 116,043 116,043 116,043 116,043 116,043 116,043 116,043 116,043
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,207,575 1,207,575 1,207,575 1,207,575 1,207,575 1,207,575 1,207,575 1,207,575 1,207,575
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ###
p 151,572 151,572 151,572 151,572 151,572 151,572 151,572 151,572 151,572
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### i 1,398,626 1,398,626 1,398,626 1,398,626 1,398,626 1,398,626 1,398,626 1,398,626 1,398,626
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### o 975,017 975,017 975,017 975,017 975,017 975,017 975,017 975,017 975,017
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,021 63,021 63,021 63,021 63,021 63,021 63,021 63,021 63,021
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 115,197 115,197 115,197 115,197 115,197 115,197 115,197 115,197 115,197
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 271,754 271,754 271,754 271,754 271,754 271,754 271,754 271,754 271,754
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 271,748 271,748 271,748 271,748 271,748 271,748 271,748 271,748 271,748
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 436,164 436,164 436,164 436,164 436,164 436,164 436,164 436,164 436,164
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 115,245 115,245 115,245 115,245 115,245 115,245 115,245 115,245 115,245
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 115,245 115,245 115,245 115,245 115,245 115,245 115,245 115,245 115,245
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 271,754 271,754 271,754 271,754 271,754 271,754 271,754 271,754 271,754
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 271,754 271,754 271,754 271,754 271,754 271,754 271,754 271,754 271,754
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 436,164 436,164 436,164 436,164 436,164 436,164 436,164 436,164 436,164
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 439,194 439,194 439,194 439,194 439,194 439,194 439,194 439,194 439,194
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 712,108 712,108 712,108 712,108 712,108 712,108 712,108 712,108 712,108
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,142,577 1,142,577 1,142,577 1,142,577 1,142,577 1,142,577 1,142,577 1,142,577 1,142,577
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 70,733 70,733 70,733 70,733 70,733 70,733 70,733 70,733 70,733
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 367,786 367,786 367,786 367,786 367,786 367,786 367,786 367,786 367,786
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 411,356 411,356 411,356 411,356 411,356 411,356 411,356 411,356 411,356
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,138,241 1,138,241 1,138,241 1,138,241 1,138,241 1,138,241 1,138,241 1,138,241 1,138,241
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 66,332 66,354 66,307 66,363 66,335 66,341 66,351 66,344 66,295
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 333,566 333,566 333,566 333,566 333,566 333,566 333,566 333,566 333,566
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 50,760 50,760 50,760 50,760 50,760 50,760 50,760 50,760 50,760
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 71,691 71,691 71,691 71,691 71,691 71,691 71,691 71,691 71,691
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 103,346 103,346 103,346 103,346 103,346 103,346 103,346 103,346 103,346
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 158,587 158,587 158,587 158,587 158,587 158,587 158,587 158,587 158,587
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 254,668 254,668 254,668 254,668 254,668 254,668 254,668 254,668 254,668
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 370,089 370,089 370,089 370,089 370,089 370,089 370,089 370,089 370,089
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 468,138 468,138 468,138 468,138 468,138 468,138 468,138 468,138 468,138
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 615,462 615,462 615,462 615,462 615,462 615,462 615,462 615,462 615,462
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 846,033 846,033 846,033 846,033 846,033 846,033 846,033 846,033 846,033

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO)
UN ### 668,756 671,648 665,449 672,888 669,169 669,995 671,235 670,409 663,797
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE
4.2 INTERNO E=1.5CM Y CAÑUELA)
ML ### 641,072 642,106 639,889 642,550 641,220 641,515 641,959 641,663 639,298

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO


4.3 (INCLUYE ARO Y TAPA HF) UN ### 717,046 718,975 714,842 719,801 717,322 717,873 718,699 718,148 713,740

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON


4.4 REFUERZO)
UN ### 791,815 795,431 787,682 796,980 792,332 793,365 794,914 793,881 785,616

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE


4.5 INTERNO E=1.5CM Y CAÑUELA) ML ### 907,237 908,693 905,572 909,318 907,445 907,861 908,486 908,070 904,740

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO


4.6 (INCLUYE ARO Y TAPA HF)
UN ### 824,436 827,088 821,405 828,224 824,815 825,573 826,709 825,952 819,891
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,021,163 1,022,240 1,019,937 1,022,699 1,021,316 1,021,625 1,022,088 1,021,778 1,019,322
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,463,408 1,466,953 1,459,365 1,468,466 1,463,913 1,464,928 1,466,448 1,465,433 1,457,341
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,982,068 1,989,762 1,973,274 1,993,059 1,983,167 1,985,364 1,988,663 1,986,465 1,968,877
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,617,837 2,630,626 2,603,218 2,636,107 2,619,664 2,623,315 2,628,799 2,625,145 2,595,910
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,862,620 1,862,620 1,862,620 1,862,620 1,862,620 1,862,620 1,862,620 1,862,620 1,862,620
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,929,561 3,929,561 3,929,561 3,929,561 3,929,561 3,929,561 3,929,561 3,929,561 3,929,561
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 142,335 142,377 142,287 142,395 142,341 142,353 142,371 142,359 142,263

5 ANDENES Y SARDINELES
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ###
p 72,632 72,746 72,502 72,795 72,648 72,681 72,730 72,697 72,437
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### i 86,256 86,370 86,126 86,419 86,272 86,305 86,354 86,321 86,061
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### o 54,365 54,888 53,768 55,112 54,440 54,589 54,813 54,664 53,469
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 59,095 59,601 58,516 59,818 59,167 59,312 59,529 59,384 58,227
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 59,375 59,868 58,812 60,079 59,446 59,586 59,797 59,657 58,531
5.6 BORDE SEPARADOR VERDE A-170 ML ### 255,484 255,526 255,435 255,544 255,490 255,502 255,520 255,508 255,411
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,892 18,955 18,820 18,981 18,901 18,919 18,946 18,928 18,784
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 39,010 39,378 38,589 39,536 39,062 39,167 39,325 39,220 38,378
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 84,587 84,609 84,561 84,619 84,590 84,597 84,606 84,600 84,548
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 560,072 560,841 559,194 561,170 560,182 560,402 560,731 560,511 558,755
5.11 LOSETA PREFABRICADA A-40 M2 ### 61,794 61,891 61,684 61,932 61,808 61,835 61,877 61,849 61,628
5.12 LOSETA PREFABRICADA A-60 M2 ### 89,884 89,980 89,773 90,022 89,897 89,925 89,966 89,939 89,718
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 33,211 33,414 32,980 33,500 33,240 33,298 33,385 33,327 32,864
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 52,702 53,111 52,233 53,287 52,760 52,877 53,053 52,936 51,999
5.15 SARDINEL PREFABRICADO A-10 ML ### 95,279 95,103 98,437 97,898 100,655 96,284 95,497 96,486 101,011
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 60,245 60,303 60,178 60,328 60,253 60,270 60,295 60,278 60,145

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 204,795 205,036 204,519 205,139 204,829 204,898 205,001 204,933 204,382
6.2 BANCA EN CONCRETO M-30 UN ### 671,959 672,297 671,574 672,442 672,008 672,104 672,249 672,152 671,381
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 218,030 218,081 217,972 218,103 218,037 218,052 218,074 218,059 217,943
6.4 BOLARDO M-60 CONCRETO UN ### 163,545 163,834 163,214 163,958 163,586 163,669 163,793 163,710 163,049
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 165,525 165,814 165,194 165,938 165,566 165,649 165,773 165,690 165,029
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 193,754 194,058 193,406 194,188 193,797 193,884 194,014 193,927 193,232
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 58,890 58,977 58,791 59,015 58,903 58,928 58,965 58,940 58,741
6.8 BORDILLO PREFABRICADO A-80 ML ### 67,043 67,141 66,932 67,182 67,057 67,085 67,127 67,099 66,876
6.9 CANECA M-120 UN ### 314,603 314,625 314,579 314,635 314,607 314,613 314,622 314,616 314,566
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 830,664 830,809 830,499 830,871 830,685 830,726 830,788 830,747 830,416
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,400,376 3,400,473 3,400,266 3,400,514 3,400,390 3,400,418 3,400,459 3,400,431 3,400,211
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,497,901 3,497,998 3,497,791 3,498,039 3,497,915 3,497,943 3,497,984 3,497,956 3,497,736
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 489,114 489,216 488,999 489,259 489,129 489,158 489,201 489,172 488,941
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 646,433 646,838 645,970 647,012 646,491 646,607 646,780 646,665 645,738
6.15 BANCA EN MADERA M-50 UN ### 539,416 539,416 539,416 539,416 539,416 539,416 539,416 539,416 539,416
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 251,329 251,474 251,164 251,536 251,350 251,391 251,453 251,412 251,081
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 578,765 578,820 578,703 578,843 578,773 578,789 578,812 578,796 578,672
6.18 POSTE HISTÓRICO M-131 UN ### 6,458,921 6,459,644 6,458,094 6,459,954 6,459,024 6,459,231 6,459,541 6,459,334 6,457,681

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,062 4,062 4,062 4,062 4,062 4,062 4,062 4,062 4,062
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,985 43,985 43,985 43,985 43,985 43,985 43,985 43,985 43,985
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 316,337 316,358 316,313 316,367 316,340 316,346 316,355 316,349 316,300
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 498,043 498,246 497,811 498,333 498,072 498,130 498,217 498,159 497,696
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 237,774 237,795 237,750 237,804 237,777 237,783 237,792 237,786 237,738
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 252,406 252,427 252,382 252,436 252,409 252,415 252,424 252,418 252,370
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 263,486 263,507 263,462 263,516 263,489 263,495 263,504 263,498 263,450
7.8 TACHAS REFLECTIVAS UN ### 13,702 13,702 13,702 13,702 13,702 13,702 13,702 13,702 13,702
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,624 14,624 14,624 14,624 14,624 14,624 14,624 14,624 14,624
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN)
UN ### 118,768 118,768 118,768 118,768 118,768 118,768 118,768 118,768 118,768
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES


1.2 201 P A UNA DISTANCIA DE 5KM)
M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE


1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE


1.4 200.2 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A


1.5 201.7 UNA DISTANCIA DE 5KM) M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS,


1.6 *** SOBREACARREOS Y DERRUMBES ###
M3-KM 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES

2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,829 35,829 35,829 35,829 35,829 35,829 35,829 35,829 35,829
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 PRÉSTAMOS M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494 494 494 494 494 494 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO
M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A


2.9 600.1 UNA DISTANCIA MENOR DE 5 KM)
M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A


2.10 600.2 UNA DISTANCIA MENOR DE 5 KM)
M3 ### 66,200 66,200 66,200 66,200 66,200 66,200 66,200 66,200 66,200

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE


2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 81,366 81,366 81,366 81,366 81,366 81,366 81,366 81,366 81,366

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE


2.12 600.4 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE


2.13 600.4 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO


2.14 600.5 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE


2.15 600.5 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 109,146 107,388 137,267 131,994 156,601 117,934 110,903 119,691 126,722
3.3 330.1 BASE GRANULAR M3 ### 114,238 112,480 142,359 137,087 161,693 123,026 115,995 124,783 165,208
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,246 3,246 3,246 3,246 3,246 3,246 3,246 3,246 3,246
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,138 1,138 1,138 1,138 1,138 1,138 1,138 1,138 1,138
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 222,832 223,874 221,642 224,320 222,981 223,279 223,725 223,428 221,047
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 64,087 64,260 63,890 64,334 64,112 64,161 64,235 64,186 63,792
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 556,283 569,803 557,973 576,563 569,803 559,663 559,663 559,663 559,663
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### p 562,733 576,253 564,423 583,013 576,253 566,113 566,113 566,113 566,113
i
o
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 601,084 614,604 602,774 621,364 614,604 604,464 604,464 604,464 604,464

3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 569,184 582,704 570,874 589,464 582,704 572,564 572,564 572,564 572,564

3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### 370,825 364,350 384,217 362,621 361,819 377,355 359,236 366,641 380,179
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 262,502 260,745 290,624 285,351 309,958 271,290 264,260 273,048 313,473
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 256,388 254,630 284,509 279,236 303,843 265,176 258,145 266,933 273,964
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 38,892 38,892 38,892 38,892 38,892 38,892 38,892 38,892 38,892

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 171,955 171,955 171,955 171,955 171,955 171,955 171,955 171,955 171,955
3.15 311.1 AFIRMADO M3 ### 62,830 68,875 65,360 65,360 68,875 74,148 56,572 60,087 65,360
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,510 11,583 11,426 11,615 11,520 11,541 11,573 11,552 11,384
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,590 4,627 4,548 4,643 4,595 4,606 4,622 4,611 4,527
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y
3.18 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 621,510 626,142 616,216 628,126 622,172 623,495 625,480 624,157 613,571

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y


3.19 500.1 ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 652,521 657,360 646,991 659,434 653,213 654,595 656,669 655,286 644,226

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y


3.20 500.1 ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 673,196 678,174 667,506 680,308 673,907 675,329 677,463 676,041 664,662

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE


3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,304 7,304 7,304 7,304 7,304 7,304 7,304 7,304 7,304
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 92,078 103,976 86,129 95,053 99,514 95,053 84,642 93,565 83,155

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 905,045 910,299 899,040 912,550 905,796 907,296 909,548 908,047 896,039
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 773,244 778,411 767,339 780,625 773,983 775,458 777,673 776,196 764,387
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 820,380 825,752 814,242 828,054 821,149 822,682 824,985 823,449 811,173
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 551,359 556,096 545,945 558,126 552,036 553,388 555,419 554,066 543,238
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 650,753 655,677 645,124 657,788 651,456 652,862 654,974 653,567 642,310
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 548,665 553,534 543,099 555,620 549,361 550,751 552,838 551,447 540,317
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 647,952 653,014 642,165 655,183 648,675 650,121 652,290 650,844 639,273
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 714,235 719,105 708,669 721,191 714,931 716,322 718,409 717,018 705,888
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 567,347 572,409 561,560 574,578 568,070 569,516 571,685 570,240 558,669
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 759,035 764,097 753,249 766,266 759,759 761,204 763,374 761,928 750,357
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P ACERO A-36 KG ### 12,243 12,243 12,243 12,243 12,243 12,243 12,243 12,243 12,243

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE


4.12 650 P ACERO A-588 GRADO B KG ### 15,622 15,622 15,622 15,622 15,622 15,622 15,622 15,622 15,622
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836 1,836
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO
4.14 621.1 TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS) ML ### 2,724,269 2,724,269 2,724,269 2,724,269 2,724,269 2,724,269 2,724,269 2,724,269 2,724,269

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN


4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,198,437 4,207,424 4,188,166 4,211,275 4,199,721 4,202,288 4,206,140 4,203,572 4,183,032
REFUERZO Y ANILLOS)

4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,736,767 1,741,588 1,731,256 1,743,654 1,737,456 1,738,833 1,740,899 1,739,522 1,728,502

4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###


U(DM3) 88,364 88,364 88,364 88,364 88,364 88,364 88,364 88,364 88,364
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 364,911 365,489 364,249 365,737 364,993 365,158 365,406 365,241 363,919
4.19 632 P BARANDA METÁLICA ML ### 432,477 432,477 432,477 432,477 432,477 432,477 432,477 432,477 432,477
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,212 17,212 17,212 17,212 17,212 17,212 17,212 17,212 17,212
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 452,194 461,041 447,892 461,074 456,647 461,355 452,736 453,435 444,962
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ###
p 67,103 79,549 68,591 77,514 81,975 77,514 67,103 76,027 94,004
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### i 76,204 79,449 76,204 76,204 79,449 84,316 68,092 76,204 76,204
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### o 354,602 359,720 348,752 361,913 355,333 356,794 358,988 357,527 345,828
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 353,157 360,524 347,519 358,582 356,296 355,541 353,059 355,436 344,700
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 361,828 369,195 356,190 367,253 364,967 364,212 361,730 364,107 353,371
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 367,882 375,196 362,306 373,230 371,014 370,244 367,738 370,130 359,518
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 376,553 383,867 370,977 381,901 379,685 378,915 376,409 378,801 368,189
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 497,473 502,501 491,728 504,654 498,192 499,627 501,782 500,345 488,856
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 594,958 600,185 588,986 602,424 595,706 597,198 599,437 597,944 585,999
4.31 681.1 GAVIÓN M3 ### 182,704 194,061 177,026 185,543 189,802 185,543 175,606 184,124 174,186
4.32 681.1 GAVIÓN MALLA PVC M3 ### 186,880 198,237 181,202 189,720 193,978 189,720 179,782 188,300 178,363
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### 41,677 41,986 41,324 42,118 41,721 41,809 41,941 41,853 41,148
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500
4.34 672.1 PSI
ML ### 15,682 15,836 15,505 15,902 15,704 15,748 15,814 15,770 15,417
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
4.35 *** (RESISTENCIA ÚLTIMA 25 KN)
M2 ### 10,284 10,284 10,284 10,284 10,284 10,284 10,284 10,284 10,284

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,596 14,596 14,596 14,596 14,596 14,596 14,596 14,596 14,596

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,589 19,589 19,589 19,589 19,589 19,589 19,589 19,589 19,589
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** (RESISTENCIA ÚLTIMA 100 KN) M2 ### 23,451 23,451 23,451 23,451 23,451 23,451 23,451 23,451 23,451

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.39 *** (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 30,088 30,088 30,088 30,088 30,088 30,088 30,088 30,088 30,088
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN,
4.40 *** FILTRO Y SEPARACIÓN)
M2 ### 7,381 7,381 7,381 7,381 7,381 7,381 7,381 7,381 7,381
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN,
4.41 *** FILTRO Y SEPARACIÓN) M2 ### 8,394 8,394 8,394 8,394 8,394 8,394 8,394 8,394 8,394

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN,


4.42 *** FILTRO Y SEPARACIÓN)
M2 ### 8,720 8,720 8,720 8,720 8,720 8,720 8,720 8,720 8,720

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,


4.43 *** FILTRO Y SEPARACIÓN)
M2 ### 6,245 6,245 6,245 6,245 6,245 6,245 6,245 6,245 6,245

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,


4.44 *** FILTRO Y SEPARACIÓN)
M2 ### 9,349 9,349 9,349 9,349 9,349 9,349 9,349 9,349 9,349
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA:
u SABANA CENTRO
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ESTOS PRECIOS CONTEMPLAN
i
ÍTEM DESCRIPCIÓN UNIDAD c Cajicá Chía Cogua Gachancipá Nemocón Sopó Tabio Tocancipá Zipaquirá
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,
4.45 *** FILTRO Y SEPARACIÓN) M2 ### p 7,644 7,644 7,644 7,644 7,644 7,644 7,644 7,644 7,644
i
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, o
4.46 *** FILTRO Y SEPARACIÓN)
M2 ### 9,349 9,349 9,349 9,349 9,349 9,349 9,349 9,349 9,349

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN,


4.47 *** FILTRO Y SEPARACIÓN)
M2 ### 17,857 17,857 17,857 17,857 17,857 17,857 17,857 17,857 17,857

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36"


4.48 661.1 CLASE I, INCLUYE EMBOQUILLADA
ML ### 636,082 636,153 636,001 636,183 636,092 636,112 636,143 636,123 635,960
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600
4.49 660.3 MM
ML ### 356,434 357,490 355,228 357,942 356,585 356,886 357,339 357,038 354,624
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO
4.50 *** 36"
ML ### 888,983 888,983 888,983 888,983 888,983 888,983 888,983 888,983 888,983
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 134,401 140,214 136,834 136,834 140,214 145,284 128,384 131,764 136,834
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,477 4,477 4,477 4,477 4,477 4,477 4,477 4,477 4,477
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4.53 *** INSTALACIÓN)
ML ### 86,429 86,429 86,429 86,429 86,429 86,429 86,429 86,429 86,429

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E


4.54 *** INSTALACIÓN) ML ### 131,634 131,634 131,634 131,634 131,634 131,634 131,634 131,634 131,634
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 501,682 506,909 495,709 509,147 502,429 503,921 506,161 504,668 492,723
4.56 682.1 P COLCHONETA RENO M3 ### 199,336 210,693 193,657 202,175 206,434 202,175 192,238 200,755 190,818
4.57 *** TRINCHO EN MADERA M2 ### 68,490 68,490 68,490 68,490 68,490 68,490 68,490 68,490 68,490

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,062 4,062 4,062 4,062 4,062 4,062 4,062 4,062 4,062
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 43,985 43,985 43,985 43,985 43,985 43,985 43,985 43,985 43,985
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 84,335 84,335 84,335 84,335 84,335 84,335 84,335 84,335 84,335
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 70,215 70,215 70,215 70,215 70,215 70,215 70,215 70,215 70,215
5.5 730.1 DEFENSA METÁLICA ML ### 148,207 148,460 147,918 148,568 148,243 148,315 148,423 148,351 147,774
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,702 13,702 13,702 13,702 13,702 13,702 13,702 13,702 13,702

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 858 858 858 858 858 858 858 858 858
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36",
6.2 801.6 INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847
DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE


6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804

6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,196 15,196 15,196 15,196 15,196 15,196 15,196 15,196 15,196
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,534 24,534 24,534 24,534 24,534 24,534 24,534 24,534 24,534
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,386 9,386 9,386 9,386 9,386 9,386 9,386 9,386 9,386
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
p CONSTRUCCIÓN
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 2,078,156 2,108,315 2,079,196 2,069,836 2,091,675 2,085,436 2,089,595 2,097,915 2,104,155 2,082,315
1.2 CAMPAMENTO 9 M2 UN ### 1,213,402 1,228,481 1,213,922 1,209,242 1,220,162 1,217,042 1,219,122 1,223,282 1,226,401 1,215,482
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,733 14,733 14,733 14,733 14,733 14,733 14,733 14,733 14,733 14,733
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,513 16,513 16,513 16,513 16,513 16,513 16,513 16,513 16,513 16,513
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,111 19,111 19,111 19,111 19,111 19,111 19,111 19,111 19,111 19,111
1.6 CERCA EN TABLA H=2.30 M ML ### 67,556 67,556 67,556 67,556 67,556 67,556 67,556 67,556 67,556 67,556
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 47,630 47,954 47,641 47,540 47,775 47,708 47,753 47,842 47,909 47,674
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,232 22,556 22,243 22,142 22,377 22,310 22,355 22,444 22,511 22,276
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 927,652 930,592 927,067 926,062 928,208 927,538 927,985 930,072 930,444 927,999

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE


1.41 PRESICIÓN
M2 ### 10,626 10,626 10,626 10,626 10,626 10,626 10,626 10,626 10,626 10,626

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,756,514 2,756,514 2,756,514 2,756,514 2,756,514 2,756,514 2,756,514 2,756,514 2,756,514 2,756,514
1.44 RED TELEFÓNICA PROVISIONAL UN ### 255,996 255,996 255,996 255,996 255,996 255,996 255,996 255,996 255,996 255,996
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 92,397 87,124 76,585 80,093 76,578 76,578 76,578 94,161 88,888 87,130
2.2 BASE ARENA CEMENTO 1:20 M3 ### 226,486 258,157 227,580 217,751 240,683 234,132 238,500 247,236 253,789 230,856
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ###
p 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### i 22,794 22,794 22,794 22,794 22,794 22,794 22,794 22,794 22,794 22,794
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### o 672,920 704,823 674,020 664,119 687,222 680,621 685,022 693,823 700,423 677,320
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 675,416 708,315 676,552 666,340 690,164 683,357 687,896 696,971 703,778 679,954
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 629,655 660,461 630,718 621,157 643,464 637,091 641,341 649,838 656,212 633,904
2.9 PILOTE DE MADERA D=20 CM ML ### 51,011 51,011 51,011 51,011 51,011 51,011 51,011 51,011 51,011 51,011
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM)
ML ### 157,518 157,518 157,518 157,518 157,518 157,518 157,518 157,518 157,518 157,518

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A


2.11 UNA DISTANCIA MENOR DE 5 KM)
ML ### 196,272 196,272 196,272 196,272 196,272 196,272 196,272 196,272 196,272 196,272

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A


2.12 UNA DISTANCIA MENOR DE 5 KM)
ML ### 243,139 243,139 243,139 243,139 243,139 243,139 243,139 243,139 243,139 243,139

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A


2.13 UNA DISTANCIA MENOR DE 5 KM) ML ### 306,228 306,228 306,228 306,228 306,228 306,228 306,228 306,228 306,228 306,228
2.14 PILOTE HINCADO 25X25 ML ### 108,533 110,759 108,609 107,918 109,531 109,070 109,377 109,991 110,452 108,840
2.15 PILOTE HINCADO 30X30 ML ### 134,004 137,231 134,115 133,114 135,450 134,783 135,228 136,118 136,786 134,449
2.16 DADOS EN CONCRETO 3500PSI M3 ### 614,657 645,462 615,720 606,159 628,466 622,093 626,342 634,840 641,214 618,906
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM) ML ### 94,368 94,368 94,368 94,368 94,368 94,368 94,368 94,368 94,368 94,368

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 39,832 40,029 39,839 39,778 39,920 39,879 39,907 39,961 40,002 39,859
3.2 SIFÓN EN PVC 6" UN ### 203,293 203,489 203,299 203,238 203,381 203,340 203,367 203,422 203,462 203,320
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 467,350 476,823 461,981 458,272 465,274 462,802 464,450 477,657 477,652 468,172
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 234,942 238,629 234,588 233,379 236,061 235,255 235,792 237,703 238,300 235,409
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 267,936 273,975 267,389 265,413 269,805 268,488 269,366 272,436 273,425 268,704
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 352,578 363,064 352,185 348,829 356,441 354,204 355,695 359,992 361,901 353,960
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 109,724 109,694 109,654 109,654 109,634 109,634 109,634 109,754 109,724 109,714
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,314,067 1,313,769 1,313,371 1,313,371 1,313,172 1,313,172 1,313,172 1,314,366 1,314,067 1,313,968
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 121,124 123,298 121,199 120,524 122,098 121,649 121,948 122,548 122,998 121,424
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 75,932 77,079 75,972 75,616 76,446 76,209 76,367 76,684 76,921 76,091
3.11 TUBERÍA DRENAJE PVC 110 ML ### 29,215 29,800 29,235 29,054 29,477 29,356 29,437 29,599 29,720 29,296
3.12 TUBERÍA DRENAJE PVC 160 ML ### 46,638 47,223 46,658 46,476 46,900 46,779 46,860 47,021 47,143 46,719
3.13 TUBERÍA DRENAJE PVC 200 ML ### 61,149 61,968 61,177 60,923 61,516 61,347 61,460 61,686 61,855 61,262
3.14 TUBERÍA DRENAJE PVC 250 ML ### 83,423 84,360 83,455 83,164 83,843 83,649 83,778 84,037 84,230 83,552
3.15 TUBERÍA DRENAJE PVC 315 ML ### 114,923 115,742 114,951 114,697 115,290 115,121 115,234 115,460 115,629 115,036
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE) UN ### 987,544 996,911 987,867 984,960 991,743 989,805 991,097 993,681 995,619 988,836
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3.17 MATERIAL FILTRANTE)
UN ### 1,397,750 1,416,484 1,398,396 1,392,582 1,406,148 1,402,272 1,404,856 1,410,024 1,413,900 1,400,334
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3.18 MATERIAL FILTRANTE)
UN ### 1,827,417 1,864,886 1,828,710 1,817,081 1,844,214 1,836,462 1,841,630 1,851,966 1,859,718 1,832,585

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 43,529 43,529 43,529 43,529 43,529 43,529 43,529 43,529 43,529 43,529
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 57,338 57,338 57,338 57,338 57,338 57,338 57,338 57,338 57,338 57,338
4.3 COLUMNAS 3500 PSI M3 ### 844,136 874,941 845,199 835,638 857,945 851,572 855,821 864,319 870,693 848,385
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 273,055 291,204 270,799 264,777 274,649 273,977 272,475 287,021 289,782 275,313
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4.5 DE REFUERZO, CONCRETO DE 3500 PSI
M2 ### 102,187 105,178 102,291 101,362 103,528 102,909 103,322 104,147 104,766 102,600

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA


4.6 DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 120,414 124,002 120,537 119,423 122,022 121,280 121,775 122,765 123,507 120,909

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 135,548 140,333 135,713 134,227 137,693 136,703 137,363 138,683 139,673 136,208

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 143,009 148,094 143,185 141,607 145,288 144,237 144,938 146,340 147,392 143,711
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### p 163,819 170,100 164,036 162,086 166,634 165,335 166,201 167,934 169,233 164,685
i
o
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 182,196 189,374 182,444 180,216 185,414 183,929 184,919 186,899 188,384 183,186

4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 202,240 210,315 202,519 200,012 205,860 204,189 205,303 207,531 209,202 203,354
4.12 ENTREPISO VIGUETA PLACA M2 ### 102,809 103,302 102,826 102,673 103,030 102,928 102,996 103,132 103,234 102,877
4.13 ESCALERA MACIZA 3500 PSI M3 ### 997,028 1,027,833 998,091 988,530 1,010,837 1,004,464 1,008,714 1,017,211 1,023,585 1,001,277
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 98,114 98,518 98,128 98,003 98,295 98,212 98,267 98,379 98,462 98,170
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 82,732 85,812 82,838 81,882 84,113 83,475 83,900 84,750 85,387 83,156
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 93,097 96,866 93,227 92,058 94,786 94,007 94,527 95,566 96,346 93,617
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 108,490 113,215 108,653 107,186 110,608 109,630 110,282 111,586 112,563 109,141
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 740,539 771,345 741,602 732,041 754,349 747,975 752,225 760,722 767,096 744,788
4.19000000000001 PASOS
M)
PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
UN ### 51,841 52,783 51,874 51,581 52,263 52,068 52,198 52,458 52,653 51,971
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 294,117 307,874 294,592 290,321 300,284 297,438 299,336 303,131 305,977 296,014
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,307 4,307 4,307 4,307 4,307 4,307 4,307 4,307 4,307 4,307
4.22 ACERO FIGURADO 60000 PSI KG ### 4,517 4,517 4,517 4,517 4,517 4,517 4,517 4,517 4,517 4,517
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,397 6,397 6,397 6,397 6,397 6,397 6,397 6,397 6,397 6,397
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 895,525 926,330 896,588 887,026 909,334 902,960 907,210 915,708 922,081 899,773
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 815,469 849,189 816,633 806,167 830,585 823,608 828,260 837,562 844,539 820,120
4.26 VIGA AÉREA 3500 PSI M3 ### 886,334 917,139 887,397 877,835 900,143 893,769 898,019 906,517 912,890 890,582
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 865,032 895,837 866,095 856,534 878,841 872,468 876,717 885,215 891,589 869,281
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,087,769 1,118,574 1,088,832 1,079,270 1,101,578 1,095,204 1,099,454 1,107,952 1,114,325 1,092,017
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 341,807 376,322 342,998 332,286 357,280 350,139 354,899 364,421 371,562 346,568

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 31,405 32,230 31,434 31,178 31,775 31,604 31,718 31,946 32,116 31,519
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 52,964 53,789 52,992 52,736 53,334 53,163 53,277 53,504 53,675 53,078
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,800 36,997 36,807 36,746 36,888 36,848 36,875 36,929 36,970 36,827
5.4 ARCOS EN LADRILLO PRENSADO ML ### 171,801 172,195 171,815 171,693 171,977 171,896 171,950 172,059 172,140 171,855
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 46,344 47,286 46,377 46,084 46,766 46,572 46,701 46,961 47,156 46,474
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,367 28,771 28,381 28,256 28,548 28,465 28,521 28,632 28,715 28,423
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 102,899 103,686 102,926 102,682 103,252 103,089 103,198 103,415 103,578 103,008
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 94,850 97,990 94,959 93,984 96,258 95,608 96,041 96,907 97,557 95,283
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 94,936 94,936 94,936 94,936 94,936 94,936 94,936 94,936 94,936 94,936
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 55,867 55,867 55,867 55,867 55,867 55,867 55,867 55,867 55,867 55,867
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 91,478 91,478 91,478 91,478 91,478 91,478 91,478 91,478 91,478 91,478
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,138 54,138 54,138 54,138 54,138 54,138 54,138 54,138 54,138 54,138
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 105,736 105,736 105,736 105,736 105,736 105,736 105,736 105,736 105,736 105,736
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,668 62,668 62,668 62,668 62,668 62,668 62,668 62,668 62,668 62,668
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 117,469 117,469 117,469 117,469 117,469 117,469 117,469 117,469 117,469 117,469
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,534 68,534 68,534 68,534 68,534 68,534 68,534 68,534 68,534 68,534
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,634 43,030 42,648 42,525 42,812 42,730 42,784 42,893 42,975 42,689
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,890 26,087 25,897 25,835 25,978 25,937 25,965 26,019 26,060 25,917
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 55,123 55,387 55,132 55,051 55,241 55,187 55,223 55,296 55,350 55,160
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,264 33,395 33,268 33,227 33,323 33,296 33,314 33,350 33,377 33,282
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 61,992 62,255 62,001 61,919 62,110 62,056 62,092 62,165 62,219 62,028
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,412 37,544 37,416 37,375 37,471 37,444 37,462 37,498 37,525 37,430
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 103,736 105,054 103,782 103,373 104,327 104,055 104,236 104,600 104,873 103,918
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 61,492 62,151 61,515 61,310 61,787 61,651 61,742 61,924 62,060 61,583
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 39,028 39,292 39,037 38,956 39,147 39,092 39,128 39,201 39,256 39,065
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,734 23,866 23,738 23,698 23,793 23,766 23,784 23,820 23,848 23,752
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 77,483 78,010 77,501 77,337 77,719 77,610 77,683 77,828 77,937 77,555
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ###
p 46,862 47,126 46,871 46,789 46,980 46,926 46,962 47,035 47,089 46,899
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### i 91,048 91,451 91,062 90,936 91,229 91,145 91,201 91,312 91,396 91,103
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### o 55,423 55,625 55,430 55,367 55,513 55,471 55,499 55,555 55,597 55,451
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 189,451 191,296 189,515 188,942 190,278 189,897 190,151 190,660 191,042 189,706
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 114,223 115,146 114,255 113,969 114,637 114,446 114,573 114,828 115,019 114,351
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 93,124 93,888 93,150 92,913 93,467 93,309 93,414 93,625 93,783 93,230
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,461 56,843 56,474 56,355 56,632 56,553 56,606 56,711 56,790 56,514
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 49,160 49,750 49,181 48,997 49,425 49,303 49,384 49,547 49,669 49,242
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,985 30,280 29,995 29,903 30,117 30,056 30,097 30,178 30,239 30,025
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 35,391 35,654 35,400 35,318 35,509 35,454 35,491 35,563 35,618 35,427
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,623 21,755 21,628 21,587 21,682 21,655 21,673 21,710 21,737 21,642
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 53,317 53,844 53,335 53,172 53,553 53,444 53,517 53,662 53,771 53,390
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,786 33,050 32,795 32,714 32,904 32,850 32,886 32,959 33,014 32,823
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 102,539 103,329 102,566 102,321 102,893 102,730 102,839 103,057 103,220 102,648
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,662 63,058 62,676 62,553 62,840 62,758 62,812 62,922 63,003 62,717
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 74,917 75,444 74,935 74,771 75,153 75,044 75,117 75,262 75,371 74,989
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,371 45,634 45,380 45,298 45,489 45,434 45,471 45,543 45,598 45,407
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 157,873 159,718 157,937 157,364 158,700 158,319 158,573 159,082 159,464 158,128
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 96,286 97,208 96,317 96,031 96,699 96,508 96,636 96,890 97,081 96,413
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 33,227 33,424 33,234 33,173 33,315 33,274 33,302 33,356 33,397 33,254
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 37,996 38,546 38,015 37,845 38,243 38,129 38,205 38,357 38,470 38,072
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,155 64,888 64,180 63,953 64,484 64,332 64,433 64,635 64,787 64,256
5.50 LAVADA DE FACHADA M2 ### 5,541 5,541 5,541 5,541 5,541 5,541 5,541 5,541 5,541 5,541
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 53,342 54,167 53,371 53,115 53,712 53,541 53,655 53,882 54,053 53,456
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,150 11,150 11,150 11,150 11,150 11,150 11,150 11,150 11,150 11,150
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,638 14,638 14,638 14,638 14,638 14,638 14,638 14,638 14,638 14,638
5.54 ANCLAJE 1/2" L=50CM UN ### 19,099 19,099 19,099 19,099 19,099 19,099 19,099 19,099 19,099 19,099
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,575 26,575 26,575 26,575 26,575 26,575 26,575 26,575 26,575 26,575
5.56 ANCLAJE 3/4" L=70CM UN ### 39,410 39,410 39,410 39,410 39,410 39,410 39,410 39,410 39,410 39,410
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,192 5,424 5,200 5,129 5,296 5,248 5,280 5,344 5,392 5,224

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,004 17,004 17,004 17,004 17,004 17,004 17,004 17,004 17,004 17,004
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,194 6,391 6,201 6,140 6,282 6,242 6,269 6,323 6,364 6,221
6.3 FILOS O DILATACIONES S/MURO ML ### 7,451 7,648 7,458 7,397 7,539 7,499 7,526 7,580 7,621 7,478
6.4 GOTERA EN MORTERO 1:4 ML ### 8,772 8,969 8,779 8,718 8,860 8,820 8,847 8,901 8,942 8,799
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,086 7,086 7,086 7,086 7,086 7,086 7,086 7,086 7,086 7,086
6.6 MALLA BAJO ENTRAMADO M2 ### 14,368 14,368 14,368 14,368 14,368 14,368 14,368 14,368 14,368 14,368
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,659 26,194 25,678 25,512 25,899 25,788 25,862 26,010 26,120 25,733
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,579 15,847 15,589 15,506 15,699 15,644 15,681 15,755 15,810 15,616
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,554 23,108 22,573 22,401 22,802 22,688 22,764 22,917 23,031 22,630
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,698 13,975 13,708 13,622 13,822 13,765 13,803 13,879 13,937 13,736
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,535 22,070 21,553 21,387 21,775 21,664 21,738 21,885 21,996 21,609
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,188 13,456 13,198 13,115 13,308 13,253 13,290 13,364 13,419 13,225
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,554 23,108 22,573 22,401 22,802 22,688 22,764 22,917 23,031 22,630
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,698 13,975 13,708 13,622 13,822 13,765 13,803 13,879 13,937 13,736
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,658 23,039 22,671 22,553 22,829 22,750 22,803 22,908 22,987 22,711
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,749 13,939 13,755 13,696 13,834 13,795 13,821 13,874 13,913 13,775
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,755 19,177 18,770 18,639 18,944 18,857 18,915 19,032 19,119 18,814
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,493 11,704 11,500 11,435 11,587 11,544 11,573 11,631 11,675 11,522
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,979 18,386 17,993 17,866 18,161 18,077 18,133 18,246 18,330 18,035
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,104 11,308 11,111 11,048 11,196 11,154 11,182 11,238 11,280 11,133
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 23,379 23,933 23,398 23,226 23,627 23,513 23,589 23,742 23,856 23,455
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ###
p 14,089 14,366 14,099 14,013 14,213 14,156 14,194 14,271 14,328 14,127
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### i 22,360 22,895 22,378 22,212 22,599 22,489 22,563 22,710 22,821 22,433
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### o 13,580 13,847 13,589 13,506 13,699 13,644 13,681 13,755 13,810 13,616
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,626 19,033 18,640 18,513 18,808 18,724 18,780 18,893 18,977 18,682
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,409 11,613 11,416 11,353 11,500 11,458 11,486 11,543 11,585 11,437
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 23,302 23,837 23,321 23,155 23,542 23,432 23,505 23,653 23,764 23,376
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,479 14,747 14,489 14,406 14,599 14,544 14,581 14,655 14,710 14,516

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 28,685 29,476 28,712 28,467 29,039 28,876 28,985 29,203 29,367 28,794
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE) M2 ### 86,246 87,816 86,300 85,813 86,950 86,625 86,842 87,275 87,599 86,463
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 57,057 57,057 57,057 57,057 57,057 57,057 57,057 57,057 57,057 57,057
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,968 22,968 22,968 22,968 22,968 22,968 22,968 22,968 22,968 22,968
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 35,983 35,983 35,983 35,983 35,983 35,983 35,983 35,983 35,983 35,983
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 83,173 83,173 83,173 83,173 83,173 83,173 83,173 83,173 83,173 83,173
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 65,273 65,273 65,273 65,273 65,273 65,273 65,273 65,273 65,273 65,273
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,244 38,244 38,244 38,244 38,244 38,244 38,244 38,244 38,244 38,244
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 87,133 87,133 87,133 87,133 87,133 87,133 87,133 87,133 87,133 87,133
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 103,917 103,917 103,917 103,917 103,917 103,917 103,917 103,917 103,917 103,917
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 152,402 152,402 152,402 152,402 152,402 152,402 152,402 152,402 152,402 152,402
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 60,704 60,704 60,704 60,704 60,704 60,704 60,704 60,704 60,704 60,704
7.13 CANAL PVC AMAZONAS ML ### 84,623 84,623 84,623 84,623 84,623 84,623 84,623 84,623 84,623 84,623
7.14 CANAL PVC RAINGO ML ### 77,054 77,054 77,054 77,054 77,054 77,054 77,054 77,054 77,054 77,054
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 135,584 135,584 135,584 135,584 135,584 135,584 135,584 135,584 135,584 135,584
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 79,026 79,026 79,026 79,026 79,026 79,026 79,026 79,026 79,026 79,026
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 58,195 58,195 58,195 58,195 58,195 58,195 58,195 58,195 58,195 58,195
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,704 33,704 33,704 33,704 33,704 33,704 33,704 33,704 33,704 33,704
7.19000000000001 TEJA DE BARRO M2 ### 62,568 63,551 62,602 62,297 63,009 62,805 62,941 63,212 63,416 62,704
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,494
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 44,493 44,493 44,493 44,493 44,493 44,493 44,493 44,493 44,493 44,493
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 37,943 37,943 37,943 37,943 37,943 37,943 37,943 37,943 37,943 37,943
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 37,115 37,115 37,115 37,115 37,115 37,115 37,115 37,115 37,115 37,115
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,390 37,390 37,390 37,390 37,390 37,390 37,390 37,390 37,390 37,390
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 52,285 52,285 52,285 52,285 52,285 52,285 52,285 52,285 52,285 52,285
7.26 TEJA PLÁSTICA No.6 M2 ### 46,050 46,050 46,050 46,050 46,050 46,050 46,050 46,050 46,050 46,050
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 83,808 83,808 83,808 83,808 83,808 83,808 83,808 83,808 83,808 83,808
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 154,159 154,159 154,159 154,159 154,159 154,159 154,159 154,159 154,159 154,159
7.29000000000001 TEJA SIN TRASLAPO M2 ### 69,525 69,525 69,525 69,525 69,525 69,525 69,525 69,525 69,525 69,525
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,568 44,568 44,568 44,568 44,568 44,568 44,568 44,568 44,568 44,568
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,763 34,763 34,763 34,763 34,763 34,763 34,763 34,763 34,763 34,763
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM)
M2 ### 59,951 59,951 59,951 59,951 59,951 59,951 59,951 59,951 59,951 59,951
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,999 20,999 20,999 20,999 20,999 20,999 20,999 20,999 20,999 20,999
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,126 25,126 25,126 25,126 25,126 25,126 25,126 25,126 25,126 25,126
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,121 27,121 27,121 27,121 27,121 27,121 27,121 27,121 27,121 27,121
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 34,738 34,738 34,738 34,738 34,738 34,738 34,738 34,738 34,738 34,738
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,101 23,101 23,101 23,101 23,101 23,101 23,101 23,101 23,101 23,101
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,297 54,297 54,297 54,297 54,297 54,297 54,297 54,297 54,297 54,297
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 363,976 363,976 363,976 363,976 363,976 363,976 363,976 363,976 363,976 363,976
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 426,542 426,542 426,542 426,542 426,542 426,542 426,542 426,542 426,542 426,542
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 279,021 279,021 279,021 279,021 279,021 279,021 279,021 279,021 279,021 279,021
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 297,411 297,411 297,411 297,411 297,411 297,411 297,411 297,411 297,411 297,411
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
8 MORTEROS Y CONCRETOS
p
8.1 CONCRETO 4000 PSI M3 ### i 472,612 504,878 473,725 463,711 487,076 480,401 484,851 493,752 500,427 477,063
8.2 CONCRETO 3500 PSI M3 ### o 414,357 444,265 415,389 406,106 427,764 421,576 425,702 433,952 440,140 418,482
8.3 CONCRETO 3000 PSI M3 ### 413,359 444,333 414,427 404,814 427,244 420,836 425,108 433,653 440,061 417,631
8.4 CONCRETO 2500 PSI M3 ### 367,029 398,422 368,112 358,368 381,102 374,607 378,937 387,597 394,092 371,359
8.5 CONCRETO 2000 PSI M3 ### 344,461 376,848 345,578 335,526 358,979 352,279 356,746 365,680 372,381 348,928
8.6 CONCRETO 1500 PSI M3 ### 315,834 349,344 316,990 306,590 330,856 323,923 328,545 337,789 344,722 320,456
8.7 MORTERO SECO 1:10 M3 ### 267,437 294,583 268,374 259,949 279,606 273,990 277,734 285,222 290,839 271,182
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 484,791 511,150 485,701 477,520 496,607 491,155 494,790 502,061 507,515 488,428
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 436,251 461,724 437,130 429,225 447,670 442,401 445,913 452,941 458,210 439,765
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 498,125 521,949 498,947 491,554 508,805 503,876 507,161 513,734 518,662 501,411
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 728,705 752,529 729,527 722,134 739,385 734,456 737,741 744,314 749,242 731,991

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 127,359 127,359 127,359 127,359 127,359 127,359 127,359 127,359 127,359 127,359
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,280 4,477 4,287 4,226 4,369 4,328 4,355 4,409 4,450 4,307
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 143,018 143,018 143,018 143,018 143,018 143,018 143,018 143,018 143,018 143,018
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 174,583 174,583 174,583 174,583 174,583 174,583 174,583 174,583 174,583 174,583
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 251,632 251,632 251,632 251,632 251,632 251,632 251,632 251,632 251,632 251,632
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 279,942 279,942 279,942 279,942 279,942 279,942 279,942 279,942 279,942 279,942
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 308,286 308,286 308,286 308,286 308,286 308,286 308,286 308,286 308,286 308,286
9.8 HOJA PUERTA FORTEC 0.81 UN ### 204,427 204,427 204,427 204,427 204,427 204,427 204,427 204,427 204,427 204,427
9.9 HOJA PUERTA FORTEC 0.91 UN ### 231,657 231,657 231,657 231,657 231,657 231,657 231,657 231,657 231,657 231,657
9.10 HOJA PUERTA FORTEC 1.50 UN ### 340,578 340,578 340,578 340,578 340,578 340,578 340,578 340,578 340,578 340,578
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 129,543 129,543 129,543 129,543 129,543 129,543 129,543 129,543 129,543 129,543
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 171,750 171,750 171,750 171,750 171,750 171,750 171,750 171,750 171,750 171,750
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 190,811 190,811 190,811 190,811 190,811 190,811 190,811 190,811 190,811 190,811
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 484,900 484,900 484,900 484,900 484,900 484,900 484,900 484,900 484,900 484,900
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 43,687 43,687 43,687 43,687 43,687 43,687 43,687 43,687 43,687 43,687
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,504 27,504 27,504 27,504 27,504 27,504 27,504 27,504 27,504 27,504
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 103,331 103,331 103,331 103,331 103,331 103,331 103,331 103,331 103,331 103,331
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 124,235 124,235 124,235 124,235 124,235 124,235 124,235 124,235 124,235 124,235
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 96,596 96,596 96,596 96,596 96,596 96,596 96,596 96,596 96,596 96,596
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,209 30,209 30,209 30,209 30,209 30,209 30,209 30,209 30,209 30,209
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,209 30,209 30,209 30,209 30,209 30,209 30,209 30,209 30,209 30,209
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,657 28,657 28,657 28,657 28,657 28,657 28,657 28,657 28,657 28,657
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 43,933 43,933 43,933 43,933 43,933 43,933 43,933 43,933 43,933 43,933
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 54,247 54,247 54,247 54,247 54,247 54,247 54,247 54,247 54,247 54,247
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 65,248 65,248 65,248 65,248 65,248 65,248 65,248 65,248 65,248 65,248
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 78,311 78,311 78,311 78,311 78,311 78,311 78,311 78,311 78,311 78,311
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 366,881 366,881 366,881 366,881 366,881 366,881 366,881 366,881 366,881 366,881
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 256,870 256,870 256,870 256,870 256,870 256,870 256,870 256,870 256,870 256,870
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 34,994 34,994 34,994 34,994 34,994 34,994 34,994 34,994 34,994 34,994
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 44,620 44,620 44,620 44,620 44,620 44,620 44,620 44,620 44,620 44,620
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 54,247 54,247 54,247 54,247 54,247 54,247 54,247 54,247 54,247 54,247
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 67,998 67,998 67,998 67,998 67,998 67,998 67,998 67,998 67,998 67,998

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 78,810 78,810 78,810 78,810 78,810 78,810 78,810 78,810 78,810 78,810
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 217,093 217,093 217,093 217,093 217,093 217,093 217,093 217,093 217,093 217,093
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO)
ML ### 83,766 83,766 83,766 83,766 83,766 83,766 83,766 83,766 83,766 83,766
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 151,062 151,062 151,062 151,062 151,062 151,062 151,062 151,062 151,062 151,062
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 141,691 141,691 141,691 141,691 141,691 141,691 141,691 141,691 141,691 141,691
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ###
p 93,051 93,051 93,051 93,051 93,051 93,051 93,051 93,051 93,051 93,051
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### i 218,683 218,683 218,683 218,683 218,683 218,683 218,683 218,683 218,683 218,683
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### o 114,271 114,271 114,271 114,271 114,271 114,271 114,271 114,271 114,271 114,271
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,877 6,877 6,877 6,877 6,877 6,877 6,877 6,877 6,877 6,877
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 104,406 104,406 104,406 104,406 104,406 104,406 104,406 104,406 104,406 104,406

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA)


10,10(1) H: 2.00 MTS
M2 ### 125,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 42,953 42,953 42,953 42,953 42,953 42,953 42,953 42,953 42,953 42,953

10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 552,674 552,674 552,674 552,674 552,674 552,674 552,674 552,674 552,674 552,674
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 199,477 199,477 199,477 199,477 199,477 199,477 199,477 199,477 199,477 199,477
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA
M2 ### 225,172 225,172 225,172 225,172 225,172 225,172 225,172 225,172 225,172 225,172

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE


10.15 PUERTAS Y ACCESORIOS)
M2 ### 504,734 504,734 504,734 504,734 504,734 504,734 504,734 504,734 504,734 504,734

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 134,307 134,307 134,307 134,307 134,307 134,307 134,307 134,307 134,307 134,307
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 402,659 402,659 402,659 402,659 402,659 402,659 402,659 402,659 402,659 402,659
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,274 6,274 6,274 6,274 6,274 6,274 6,274 6,274 6,274 6,274
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 284,049 284,049 284,049 284,049 284,049 284,049 284,049 284,049 284,049 284,049
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 127,594 127,594 127,594 127,594 127,594 127,594 127,594 127,594 127,594 127,594
10.21 REJILLA PISO 0.30 M M2 ### 89,228 89,228 89,228 89,228 89,228 89,228 89,228 89,228 89,228 89,228
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 92,309 92,309 92,309 92,309 92,309 92,309 92,309 92,309 92,309 92,309
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 11,010 11,010 11,010 11,010 11,010 11,010 11,010 11,010 11,010 11,010
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS
10.24 DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 12,190 12,190 12,190 12,190 12,190 12,190 12,190 12,190 12,190 12,190
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO,
MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,739 9,739 9,739 9,739 9,739 9,739 9,739 9,739 9,739 9,739
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 231,079 231,079 231,079 231,079 231,079 231,079 231,079 231,079 231,079 231,079
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 277,539 277,539 277,539 277,539 277,539 277,539 277,539 277,539 277,539 277,539
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,968 22,968 22,968 22,968 22,968 22,968 22,968 22,968 22,968 22,968
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 35,983 35,983 35,983 35,983 35,983 35,983 35,983 35,983 35,983 35,983
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,655 34,655 34,655 34,655 34,655 34,655 34,655 34,655 34,655 34,655
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,301 44,301 44,301 44,301 44,301 44,301 44,301 44,301 44,301 44,301
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 90,980 90,980 90,980 90,980 90,980 90,980 90,980 90,980 90,980 90,980
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 232,465 232,465 232,465 232,465 232,465 232,465 232,465 232,465 232,465 232,465
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,900 46,900 46,900 46,900 46,900 46,900 46,900 46,900 46,900 46,900
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 36,686 36,686 36,686 36,686 36,686 36,686 36,686 36,686 36,686 36,686
11.13 NIPLE PASAMURO 2" UN ### 70,239 70,239 70,239 70,239 70,239 70,239 70,239 70,239 70,239 70,239
11.14 NIPLE PASAMURO 4" UN ### 104,815 104,815 104,815 104,815 104,815 104,815 104,815 104,815 104,815 104,815
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
11.15 PUNTO AGUA CALIENTE CPVC UN ###
p 88,005 88,005 88,005 88,005 88,005 88,005 88,005 88,005 88,005 88,005
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### i 64,803 64,803 64,803 64,803 64,803 64,803 64,803 64,803 64,803 64,803
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### o 68,787 68,787 68,787 68,787 68,787 68,787 68,787 68,787 68,787 68,787
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 86,894 86,894 86,894 86,894 86,894 86,894 86,894 86,894 86,894 86,894
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 69,642 69,642 69,642 69,642 69,642 69,642 69,642 69,642 69,642 69,642
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 86,653 86,653 86,653 86,653 86,653 86,653 86,653 86,653 86,653 86,653
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 92,547 92,547 92,547 92,547 92,547 92,547 92,547 92,547 92,547 92,547
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 76,164 76,164 76,164 76,164 76,164 76,164 76,164 76,164 76,164 76,164
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,960 12,960 12,960 12,960 12,960 12,960 12,960 12,960 12,960 12,960
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,152 18,152 18,152 18,152 18,152 18,152 18,152 18,152 18,152 18,152
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,719 23,719 23,719 23,719 23,719 23,719 23,719 23,719 23,719 23,719
11.26 RED SUMINISTRO PVC 1" ML ### 14,710 14,710 14,710 14,710 14,710 14,710 14,710 14,710 14,710 14,710
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,828 8,828 8,828 8,828 8,828 8,828 8,828 8,828 8,828 8,828
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 52,600 52,600 52,600 52,600 52,600 52,600 52,600 52,600 52,600 52,600
11.29 RED SUMINISTRO PVC 2" ML ### 33,725 33,725 33,725 33,725 33,725 33,725 33,725 33,725 33,725 33,725
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,027 11,027 11,027 11,027 11,027 11,027 11,027 11,027 11,027 11,027
11.31 RED SANITARIA PVC-S 2" ML ### 26,139 26,139 26,139 26,139 26,139 26,139 26,139 26,139 26,139 26,139
11.32 RED SANITARIA PVC-S 3" ML ### 36,193 36,193 36,193 36,193 36,193 36,193 36,193 36,193 36,193 36,193
11.33 RED SANITARIA PVC-S 4" ML ### 49,065 49,065 49,065 49,065 49,065 49,065 49,065 49,065 49,065 49,065
11.34 RED SANITARIA PVC-S 6" ML ### 91,212 91,212 91,212 91,212 91,212 91,212 91,212 91,212 91,212 91,212
11.35 REGISTRO 1" UN ### 111,229 111,229 111,229 111,229 111,229 111,229 111,229 111,229 111,229 111,229
11.36 REGISTRO 1/2" UN ### 62,086 62,086 62,086 62,086 62,086 62,086 62,086 62,086 62,086 62,086
11.37 REGISTRO 3/4" UN ### 78,860 78,860 78,860 78,860 78,860 78,860 78,860 78,860 78,860 78,860
11.38 REGISTRO 1 1/2" UN ### 189,925 189,925 189,925 189,925 189,925 189,925 189,925 189,925 189,925 189,925
11.39 REGISTRO 2 1/2" UN ### 390,746 390,746 390,746 390,746 390,746 390,746 390,746 390,746 390,746 390,746
11.40 REGISTRO 2" UN ### 289,063 289,063 289,063 289,063 289,063 289,063 289,063 289,063 289,063 289,063
11.41 REVENTILACIÓN 2" ML ### 18,277 18,277 18,277 18,277 18,277 18,277 18,277 18,277 18,277 18,277
11.42 REVENTILACIÓN 3" ML ### 23,046 23,046 23,046 23,046 23,046 23,046 23,046 23,046 23,046 23,046
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN) UN ### 179,157 179,157 179,157 179,157 179,157 179,157 179,157 179,157 179,157 179,157

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E


11.44 ISNTALACIÓN)
UN ### 290,795 290,795 290,795 290,795 290,795 290,795 290,795 290,795 290,795 290,795

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E


11.45 INSTALACIÓN)
UN ### 483,302 483,302 483,302 483,302 483,302 483,302 483,302 483,302 483,302 483,302

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11.46 SOPORTES)
ML ### 41,651 41,651 41,651 41,651 41,651 41,651 41,651 41,651 41,651 41,651

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE


11.47 ACCESORIOS Y SOPORTES)
ML ### 49,102 49,102 49,102 49,102 49,102 49,102 49,102 49,102 49,102 49,102

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.48 SOPORTES)
ML ### 63,273 63,273 63,273 63,273 63,273 63,273 63,273 63,273 63,273 63,273

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS


11.49 Y SOPORTES)
ML ### 71,571 71,571 71,571 71,571 71,571 71,571 71,571 71,571 71,571 71,571

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE


11.50 ACCESORIOS Y SOPORTES) ML ### 92,206 92,206 92,206 92,206 92,206 92,206 92,206 92,206 92,206 92,206

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS


11.51 Y SOPORTES) ML ### 107,246 107,246 107,246 107,246 107,246 107,246 107,246 107,246 107,246 107,246

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS


11.52 Y SOPORTES) ML ### 158,700 158,700 158,700 158,700 158,700 158,700 158,700 158,700 158,700 158,700

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,305 64,305 64,305 64,305 64,305 64,305 64,305 64,305 64,305 64,305
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,562 64,562 64,562 64,562 64,562 64,562 64,562 64,562 64,562 64,562
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,324 41,324 41,324 41,324 41,324 41,324 41,324 41,324 41,324 41,324
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 50,800 50,800 50,800 50,800 50,800 50,800 50,800 50,800 50,800 50,800
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA
11.57 2" ML ### 4,280 4,280 4,280 4,280 4,280 4,280 4,280 4,280 4,280 4,280
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A
11.58 ML ### p 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733
2"
i
11.59 GABINETE TIPO III UN ### o 1,042,987 1,042,987 1,042,987 1,042,987 1,042,987 1,042,987 1,042,987 1,042,987 1,042,987 1,042,987
11.60 GABINETE TIPO I UN ### 798,186 798,186 798,186 798,186 798,186 798,186 798,186 798,186 798,186 798,186
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,670,548 2,670,548 2,670,548 2,670,548 2,670,548 2,670,548 2,670,548 2,670,548 2,670,548 2,670,548
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,227,695 2,227,695 2,227,695 2,227,695 2,227,695 2,227,695 2,227,695 2,227,695 2,227,695 2,227,695
11.63 VÁLVULA MARIPOSA 3" UN ### 651,359 651,359 651,359 651,359 651,359 651,359 651,359 651,359 651,359 651,359
11.64 VÁLVULA MARIPOSA 4" UN ### 840,882 840,882 840,882 840,882 840,882 840,882 840,882 840,882 840,882 840,882
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 321,694 321,694 321,694 321,694 321,694 321,694 321,694 321,694 321,694 321,694

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 374,784 374,784 374,784 374,784 374,784 374,784 374,784 374,784 374,784 374,784
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,532 59,532 59,532 59,532 59,532 59,532 59,532 59,532 59,532 59,532
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 70,373 70,373 70,373 70,373 70,373 70,373 70,373 70,373 70,373 70,373
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 78,253 78,253 78,253 78,253 78,253 78,253 78,253 78,253 78,253 78,253
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 92,036 92,036 92,036 92,036 92,036 92,036 92,036 92,036 92,036 92,036
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 56,031 56,031 56,031 56,031 56,031 56,031 56,031 56,031 56,031 56,031
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 63,819 63,819 63,819 63,819 63,819 63,819 63,819 63,819 63,819 63,819
12.8 STRIP TELEFÓNICO 10 PARES UN ### 148,017 148,017 148,017 148,017 148,017 148,017 148,017 148,017 148,017 148,017
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 57,490 57,490 57,490 57,490 57,490 57,490 57,490 57,490 57,490 57,490
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 131,983 131,983 131,983 131,983 131,983 131,983 131,983 131,983 131,983 131,983
12.11 SALIDA T.V PVC COMPLETA. UN ### 79,051 79,051 79,051 79,051 79,051 79,051 79,051 79,051 79,051 79,051
12.12 SALIDA BIFÁSICA C.N. UN ### 46,855 46,855 46,855 46,855 46,855 46,855 46,855 46,855 46,855 46,855
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 99,072 99,072 99,072 99,072 99,072 99,072 99,072 99,072 99,072 99,072
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 423,330 423,330 423,330 423,330 423,330 423,330 423,330 423,330 423,330 423,330
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 563,216 563,216 563,216 563,216 563,216 563,216 563,216 563,216 563,216 563,216
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,644 3,644 3,644 3,644 3,644 3,644 3,644 3,644 3,644 3,644
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,816 4,816 4,816 4,816 4,816 4,816 4,816 4,816 4,816 4,816
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,392 13,392 13,392 13,392 13,392 13,392 13,392 13,392 13,392 13,392
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 281,073 281,073 281,073 281,073 281,073 281,073 281,073 281,073 281,073 281,073
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 79,642 79,642 79,642 79,642 79,642 79,642 79,642 79,642 79,642 79,642
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 107,441 107,441 107,441 107,441 107,441 107,441 107,441 107,441 107,441 107,441
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,471 44,471 44,471 44,471 44,471 44,471 44,471 44,471 44,471 44,471
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,444,863 1,444,863 1,444,863 1,444,863 1,444,863 1,444,863 1,444,863 1,444,863 1,444,863 1,444,863
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,070,761 1,070,761 1,070,761 1,070,761 1,070,761 1,070,761 1,070,761 1,070,761 1,070,761 1,070,761
12.26 POSTE METÁLICO 6M UN ### 1,328,035 1,328,035 1,328,035 1,328,035 1,328,035 1,328,035 1,328,035 1,328,035 1,328,035 1,328,035
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 616,756 616,756 616,756 616,756 616,756 616,756 616,756 616,756 616,756 616,756
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 113,407 113,407 113,407 113,407 113,407 113,407 113,407 113,407 113,407 113,407
12.29 LUMINARIA 70W SODIO UN ### 517,220 517,220 517,220 517,220 517,220 517,220 517,220 517,220 517,220 517,220
12.30 LUMINARIA 150W SODIO UN ### 646,736 646,736 646,736 646,736 646,736 646,736 646,736 646,736 646,736 646,736
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,705,974 1,705,974 1,705,974 1,705,974 1,705,974 1,705,974 1,705,974 1,705,974 1,705,974 1,705,974
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,256,674 1,256,674 1,256,674 1,256,674 1,256,674 1,256,674 1,256,674 1,256,674 1,256,674 1,256,674

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,696 42,612 41,728 41,443 42,107 41,917 42,044 42,296 42,486 41,823
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,117 42,034 41,149 40,865 41,528 41,339 41,465 41,718 41,907 41,244
13.3 ALISTADO PARA LISTÓN M2 ### 15,540 15,723 15,546 15,489 15,622 15,584 15,610 15,660 15,698 15,565
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 29,689 31,522 29,753 29,184 30,511 30,132 30,385 30,890 31,269 29,942
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 88,242 90,074 88,305 87,736 89,063 88,684 88,937 89,442 89,821 88,494
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 28,304 28,952 28,326 28,125 28,594 28,460 28,550 28,729 28,863 28,393
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 60,730 63,870 60,839 59,864 62,138 61,488 61,921 62,787 63,437 61,163
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 84,002 89,024 84,175 82,616 86,253 85,214 85,907 87,292 88,332 84,694
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,525 31,525 31,525 31,525 31,525 31,525 31,525 31,525 31,525 31,525
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
13.10 PEGANTE MORTERO-CONCRETO M2 ###
p 24,110 24,110 24,110 24,110 24,110 24,110 24,110 24,110 24,110 24,110
13.11 PERMA PLY 2 CAPAS M2 ### i 28,384 28,384 28,384 28,384 28,384 28,384 28,384 28,384 28,384 28,384
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### o 49,387 52,212 49,484 48,607 50,653 50,069 50,458 51,238 51,822 49,776
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 57,831 61,284 57,950 56,879 59,379 58,665 59,141 60,094 60,808 58,308
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 83,700 89,037 83,884 82,228 86,093 84,988 85,725 87,197 88,301 84,436
13.15 TRITURADO FINO 1/2 M3 ### 115,444 140,330 116,302 108,579 126,600 121,451 124,883 131,748 136,897 118,876
13.16 TRITURADO GRUESO 3/4 M3 ### 112,818 132,232 110,743 104,347 118,474 114,211 117,053 127,514 130,583 115,262

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 59,760 60,127 59,773 59,659 59,925 59,849 59,899 60,000 60,076 59,811
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,891 36,074 35,897 35,840 35,973 35,935 35,960 36,011 36,049 35,916
14.3 ADOQUÍN CONCRETO 6CM M2 ### 68,463 69,380 68,495 68,210 68,874 68,684 68,811 69,064 69,253 68,590
14.4 ADOQUÍN CONCRETO 8CM M2 ### 71,863 72,780 71,895 71,610 72,274 72,084 72,211 72,464 72,653 71,990
14.5 ADOQUÍN GRES PEATONAL M2 ### 76,317 77,233 76,348 76,064 76,727 76,538 76,664 76,917 77,106 76,443
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO
M2 ### 78,376 78,743 78,389 78,275 78,541 78,465 78,515 78,616 78,692 78,427
14.7 GRAVILLA PARA GRADAS ML ### 39,925 40,342 39,939 39,810 40,112 40,026 40,083 40,199 40,285 39,983
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 170,557 172,206 170,614 170,102 171,296 170,955 171,183 171,638 171,979 170,785
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 49,757 50,775 49,792 49,476 50,213 50,003 50,143 50,424 50,635 49,897
14.10 GUARDAESCOBA EN GRANITO ML### 46,359 46,359 46,359 46,359 46,359 46,359 46,359 46,359 46,359 46,359
14.11 GUARDAESCOBA EN GRAVILLA ML### 11,029 11,446 11,043 10,913 11,216 11,129 11,187 11,302 11,388 11,086
14.12 GUARDAESCOBA PVC CARAMELO ML### 9,702 9,702 9,702 9,702 9,702 9,702 9,702 9,702 9,702 9,702
14.13 GUARDAESCOBA PVC CEDRO ML### 13,000 13,000 13,000 13,000 13,000 13,000 13,000 13,000 13,000 13,000
14.14 GUARDAESCOBA PINO CARIBE ML### 11,043 11,043 11,043 11,043 11,043 11,043 11,043 11,043 11,043 11,043
14.15 GUARDAESCOBA CEDRO BLANCO ML### 18,334 18,334 18,334 18,334 18,334 18,334 18,334 18,334 18,334 18,334
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,489 35,489 35,489 35,489 35,489 35,489 35,489 35,489 35,489 35,489
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,836 9,836 9,836 9,836 9,836 9,836 9,836 9,836 9,836 9,836
14.18 LISTÓN M.H. AMARILLO M2 ### 77,796 77,796 77,796 77,796 77,796 77,796 77,796 77,796 77,796 77,796
14.19 PASO ESCALERA GRANITO ML ### 124,695 125,978 124,739 124,341 125,270 125,004 125,181 125,535 125,801 124,872
14.20 PIRLANES ALUMINIO ML ### 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086
14.21 PIRLANES LADRILLO ML ### 34,142 34,536 34,156 34,034 34,318 34,237 34,291 34,400 34,481 34,196
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 47,663 47,663 47,663 47,663 47,663 47,663 47,663 47,663 47,663 47,663
14.23 PISO VINILO TRÁFICO PESADO M2 ### 55,277 55,277 55,277 55,277 55,277 55,277 55,277 55,277 55,277 55,277
14.24 PULIDA LACADA PISO MADERA M2 ### 51,635 51,635 51,635 51,635 51,635 51,635 51,635 51,635 51,635 51,635
14.25 TABLETA DE GRES 25X25 M2 ### 51,928 52,295 51,941 51,827 52,093 52,017 52,067 52,168 52,244 51,979
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,156 58,522 58,168 58,055 58,320 58,244 58,295 58,396 58,472 58,206
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,609 11,609 11,609 11,609 11,609 11,609 11,609 11,609 11,609 11,609
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 52,277 52,867 52,297 52,114 52,541 52,419 52,500 52,663 52,785 52,358
14.29 JABONERA PORCELANA ACUARIO UN ### 21,448 21,448 21,448 21,448 21,448 21,448 21,448 21,448 21,448 21,448
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 127,909 127,909 127,909 127,909 127,909 127,909 127,909 127,909 127,909 127,909
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,564 10,564 10,564 10,564 10,564 10,564 10,564 10,564 10,564 10,564
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,473 23,473 23,473 23,473 23,473 23,473 23,473 23,473 23,473 23,473
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,193 15,193 15,193 15,193 15,193 15,193 15,193 15,193 15,193 15,193
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,771 14,771 14,771 14,771 14,771 14,771 14,771 14,771 14,771 14,771
14.35 REMATES BOCEL ALUMINIO ML ### 9,111 9,111 9,111 9,111 9,111 9,111 9,111 9,111 9,111 9,111
14.36 REMATES BOCEL PORCELANA ML ### 9,265 9,265 9,265 9,265 9,265 9,265 9,265 9,265 9,265 9,265
14.37 TAPA REGISTRO 20X20 UN ### 19,944 19,944 19,944 19,944 19,944 19,944 19,944 19,944 19,944 19,944
14.38 TAPA REGISTRO 6X6 UN ### 18,208 18,208 18,208 18,208 18,208 18,208 18,208 18,208 18,208 18,208

14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 19,197 19,197 19,197 19,197 19,197 19,197 19,197 19,197 19,197 19,197
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO M2 ### p 22,193 22,193 22,193 22,193 22,193 22,193 22,193 22,193 22,193 22,193
i
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### o 67,938 68,305 67,951 67,837 68,103 68,027 68,077 68,179 68,254 67,989
14.42 MEDIA CAÑA EN GRANITO ML ### 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,572 36,572 36,572 36,572 36,572 36,572 36,572 36,572 36,572 36,572
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,906 13,906 13,906 13,906 13,906 13,906 13,906 13,906 13,906 13,906
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 104,695 104,695 104,695 104,695 104,695 104,695 104,695 104,695 104,695 104,695
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 127,066 127,066 127,066 127,066 127,066 127,066 127,066 127,066 127,066 127,066

15 CIELO RASO
15.1 APLIQUE YESO ML ### 75,216 75,216 75,216 75,216 75,216 75,216 75,216 75,216 75,216 75,216
15.2 ARMADURA MADERA Y MALLA M2 ### 38,171 38,171 38,171 38,171 38,171 38,171 38,171 38,171 38,171 38,171
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,077 58,077 58,077 58,077 58,077 58,077 58,077 58,077 58,077 58,077
15.4 CIELO RASO DURACUSTIC M2 ### 71,000 71,000 71,000 71,000 71,000 71,000 71,000 71,000 71,000 71,000
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,096 53,096 53,096 53,096 53,096 53,096 53,096 53,096 53,096 53,096
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 97,960 97,960 97,960 97,960 97,960 97,960 97,960 97,960 97,960 97,960
15.7 CORNISAS YESO ML ### 50,416 50,416 50,416 50,416 50,416 50,416 50,416 50,416 50,416 50,416
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 108,024 108,024 108,024 108,024 108,024 108,024 108,024 108,024 108,024 108,024
15.9 MALLA CON VENA M2 ### 14,271 14,271 14,271 14,271 14,271 14,271 14,271 14,271 14,271 14,271

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
16.2 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE


16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 79,724 74,451 67,421 67,421 63,906 63,906 63,906 84,997 79,724 77,967
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 119,868 145,628 120,757 112,762 131,416 126,087 129,640 136,746 142,075 123,421
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE M3 ### 171,983 166,710 159,679 159,679 156,164 156,164 156,164 159,679 171,983 170,225
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 81,552 76,279 65,740 69,248 65,733 65,733 65,733 83,316 78,043 76,285
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 159,088 153,815 146,785 146,785 143,269 143,269 143,269 146,785 159,088 157,330
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 168,417 163,144 156,113 156,113 152,598 152,598 152,598 156,113 168,417 166,659

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 312,396 312,396 312,396 312,396 312,396 312,396 312,396 312,396 312,396 312,396
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 GRIFERÍA)
UN ### 916,738 916,738 916,738 916,738 916,738 916,738 916,738 916,738 916,738 916,738

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 497,620 497,620 497,620 497,620 497,620 497,620 497,620 497,620 497,620 497,620
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE
17.4 GRIFERÍA)
UN ### 146,119 146,119 146,119 146,119 146,119 146,119 146,119 146,119 146,119 146,119
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE
17.5 GRIFERÍA)
UN ### 203,339 203,339 203,339 203,339 203,339 203,339 203,339 203,339 203,339 203,339
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
17.6 GRIFERÍA)
UN ### p 189,002 189,002 189,002 189,002 189,002 189,002 189,002 189,002 189,002 189,002
i
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### o 413,342 413,342 413,342 413,342 413,342 413,342 413,342 413,342 413,342 413,342
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
17.8 GRIFERÍA)
UN ### 1,053,899 1,053,899 1,053,899 1,053,899 1,053,899 1,053,899 1,053,899 1,053,899 1,053,899 1,053,899

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 300,881 300,881 300,881 300,881 300,881 300,881 300,881 300,881 300,881 300,881
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A
17.10 BAÑERA
UN ### 214,059 214,059 214,059 214,059 214,059 214,059 214,059 214,059 214,059 214,059
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 86,441 86,441 86,441 86,441 86,441 86,441 86,441 86,441 86,441 86,441

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO


17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 258,401 258,401 258,401 258,401 258,401 258,401 258,401 258,401 258,401 258,401

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO


17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 379,576 379,576 379,576 379,576 379,576 379,576 379,576 379,576 379,576 379,576

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,772 8,772 8,772 8,772 8,772 8,772 8,772 8,772 8,772 8,772
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,235 3,235 3,235 3,235 3,235 3,235 3,235 3,235 3,235 3,235
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,773 11,773 11,773 11,773 11,773 11,773 11,773 11,773 11,773 11,773
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,231 44,231 44,231 44,231 44,231 44,231 44,231 44,231 44,231 44,231
18.5 CARBURO SOBRE PAÑETES M2 ### 6,165 6,165 6,165 6,165 6,165 6,165 6,165 6,165 6,165 6,165
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 67,696 67,696 67,696 67,696 67,696 67,696 67,696 67,696 67,696 67,696
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680 3,680
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,909 2,909 2,909 2,909 2,909 2,909 2,909 2,909 2,909 2,909
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,670 14,670 14,670 14,670 14,670 14,670 14,670 14,670 14,670 14,670
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,237 4,237 4,237 4,237 4,237 4,237 4,237 4,237 4,237 4,237
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,463 15,463 15,463 15,463 15,463 15,463 15,463 15,463 15,463 15,463
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,975 5,975 5,975 5,975 5,975 5,975 5,975 5,975 5,975 5,975
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,816 6,816 6,816 6,816 6,816 6,816 6,816 6,816 6,816 6,816
18.14 ESTUCO M2 ### 7,438 7,438 7,438 7,438 7,438 7,438 7,438 7,438 7,438 7,438
18.15 ESTUCO (LINEAL) ML ### 4,668 4,668 4,668 4,668 4,668 4,668 4,668 4,668 4,668 4,668
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,351 16,351
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,167 10,167 10,167 10,167 10,167 10,167 10,167 10,167 10,167 10,167
18.18 LACA PISOS MADERA M2 ### 24,109 24,109 24,109 24,109 24,109 24,109 24,109 24,109 24,109 24,109
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,835 2,835 2,835 2,835 2,835 2,835 2,835 2,835 2,835 2,835
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,684 12,684 12,684 12,684 12,684 12,684 12,684 12,684 12,684 12,684
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,428 3,428 3,428 3,428 3,428 3,428 3,428 3,428 3,428 3,428
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,242 13,242 13,242 13,242 13,242 13,242 13,242 13,242 13,242 13,242
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,705 4,705 4,705 4,705 4,705 4,705 4,705 4,705 4,705 4,705
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,763 22,763 22,763 22,763 22,763 22,763 22,763 22,763 22,763 22,763
18.26 PINTURA EPÓXICA M2 ### 13,391 13,391 13,391 13,391 13,391 13,391 13,391 13,391 13,391 13,391
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,295 8,295 8,295 8,295 8,295 8,295 8,295 8,295 8,295 8,295

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,229,602 6,229,602 6,229,602 6,229,602 6,229,602 6,229,602 6,229,602 6,229,602 6,229,602 6,229,602
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 11,006,795 11,006,795 11,006,795 11,006,795 ### 11,006,795 11,006,795 11,006,795 11,006,795 11,006,795
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,880,742 2,880,742 2,880,742 2,880,742 2,880,742 2,880,742 2,880,742 2,880,742 2,880,742 2,880,742
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,413,862 9,413,862 9,413,862 9,413,862 9,413,862 9,413,862 9,413,862 9,413,862 9,413,862 9,413,862
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,814,526 8,814,526 8,814,526 8,814,526 8,814,526 8,814,526 8,814,526 8,814,526 8,814,526 8,814,526
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,835 2,835 2,835 2,835 2,835 2,835 2,835 2,835 2,835 2,835
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ###
p 885,406 885,406 885,406 885,406 885,406 885,406 885,406 885,406 885,406 885,406
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### i 88,286 88,286 88,286 88,286 88,286 88,286 88,286 88,286 88,286 88,286
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### o 1,600,296 1,600,619 1,600,307 1,600,207 1,600,441 1,600,374 1,600,419 1,600,508 1,600,575 1,600,341
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 698,853 706,596 699,120 696,716 702,324 700,722 701,790 703,926 705,528 699,921

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,322 30,322 30,322 30,322 30,322 30,322 30,322 30,322 30,322 30,322
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 44,991 44,991 44,991 44,991 44,991 44,991 44,991 44,991 44,991 44,991
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 55,765 55,765 55,765 55,765 55,765 55,765 55,765 55,765 55,765 55,765
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,255 18,255 18,255 18,255 18,255 18,255 18,255 18,255 18,255 18,255

20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,104 22,104 22,104 22,104 22,104 22,104 22,104 22,104 22,104 22,104

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,108 30,108 30,108 30,108 30,108 30,108 30,108 30,108 30,108 30,108
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,978 26,978 26,978 26,978 26,978 26,978 26,978 26,978 26,978 26,978
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,453 28,453 28,453 28,453 28,453 28,453 28,453 28,453 28,453 28,453
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,562 35,562 35,562 35,562 35,562 35,562 35,562 35,562 35,562 35,562
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,252 18,252 18,252 18,252 18,252 18,252 18,252 18,252 18,252 18,252
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 23,891 23,891 23,891 23,891 23,891 23,891 23,891 23,891 23,891 23,891
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,677 36,677 36,677 36,677 36,677 36,677 36,677 36,677 36,677 36,677
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 280,181 280,181 280,181 280,181 280,181 280,181 280,181 280,181 280,181 280,181
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 322,405 322,405 322,405 322,405 322,405 322,405 322,405 322,405 322,405 322,405
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 336,349 336,349 336,349 336,349 336,349 336,349 336,349 336,349 336,349 336,349
20.16 ACOMETIDA GAS 1/2" ML ### 312,628 312,628 312,628 312,628 312,628 312,628 312,628 312,628 312,628 312,628

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 228,345 228,345 228,345 228,345 228,345 228,345 228,345 228,345 228,345 228,345
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 34,896 34,896 34,896 34,896 34,896 34,896 34,896 34,896 34,896 34,896
21.3 SIRENA DE 110 V UN ### 106,937 106,937 106,937 106,937 106,937 106,937 106,937 106,937 106,937 106,937
21.4 CÁMARA CCTV UN ### 274,199 274,199 274,199 274,199 274,199 274,199 274,199 274,199 274,199 274,199
21.5 PARLANTE-CIELO FALSO UN ### 54,096 54,096 54,096 54,096 54,096 54,096 54,096 54,096 54,096 54,096
21.6 AMPLIFICADOR 100W UN ### 591,798 591,798 591,798 591,798 591,798 591,798 591,798 591,798 591,798 591,798
21.7 AMPLIFICADOR 300W UN ### 1,461,573 1,461,573 1,461,573 1,461,573 1,461,573 1,461,573 1,461,573 1,461,573 1,461,573 1,461,573
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,636 47,636 47,636 47,636 47,636 47,636 47,636 47,636 47,636 47,636
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 228,057 228,057 228,057 228,057 228,057 228,057 228,057 228,057 228,057 228,057
21.10 TOMA PARA MICRÓFONO UN ### 45,965 45,965 45,965 45,965 45,965 45,965 45,965 45,965 45,965 45,965
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,896 3,896 3,896 3,896 3,896 3,896 3,896 3,896 3,896 3,896
21.12 SPLITERS UN ### 6,503 6,503 6,503 6,503 6,503 6,503 6,503 6,503 6,503 6,503
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,657 19,657 19,657 19,657 19,657 19,657 19,657 19,657 19,657 19,657
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,685 25,685 25,685 25,685 25,685 25,685 25,685 25,685 25,685 25,685
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,318 33,318 33,318 33,318 33,318 33,318 33,318 33,318 33,318 33,318
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 126,638 126,638 126,638 126,638 126,638 126,638 126,638 126,638 126,638 126,638
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 33,056 33,056 33,056 33,056 33,056 33,056 33,056 33,056 33,056 33,056
21.18 BANDEJA PORTACABLES PARA RACK UN ### 107,793 107,793 107,793 107,793 107,793 107,793 107,793 107,793 107,793 107,793
21.19 RACK 2' X 24" UN ### 192,192 192,192 192,192 192,192 192,192 192,192 192,192 192,192 192,192 192,192
21.20 RACK 3' X 24" UN ### 299,752 299,752 299,752 299,752 299,752 299,752 299,752 299,752 299,752 299,752
21.21 RACK 5' X 24" UN ### 373,384 373,384 373,384 373,384 373,384 373,384 373,384 373,384 373,384 373,384
21.22 RACK 7' X 24" UN ### 407,422 407,422 407,422 407,422 407,422 407,422 407,422 407,422 407,422 407,422
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 599,859 599,859 599,859 599,859 599,859 599,859 599,859 599,859 599,859 599,859
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 354,295 354,295 354,295 354,295 354,295 354,295 354,295 354,295 354,295 354,295
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 107,367 107,367 107,367 107,367 107,367 107,367 107,367 107,367 107,367 107,367
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,251 14,251 14,251 14,251 14,251 14,251 14,251 14,251 14,251 14,251
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
21.27 PATCH CORD 5M CATEGORÍA 6A UN ###
p 29,092 29,092 29,092 29,092 29,092 29,092 29,092 29,092 29,092 29,092
21.28 CABLE UTP CATEGORÍA 6A ML ### i 5,206 5,206 5,206 5,206 5,206 5,206 5,206 5,206 5,206 5,206
21.29 CANALETA METÁLICA 4X6 CMS ML ### o 36,820 36,820 36,820 36,820 36,820 36,820 36,820 36,820 36,820 36,820
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,444 38,444 38,444 38,444 38,444 38,444 38,444 38,444 38,444 38,444
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,254 39,254 39,254 39,254 39,254 39,254 39,254 39,254 39,254 39,254
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,622 25,622 25,622 25,622 25,622 25,622 25,622 25,622 25,622 25,622
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,290 28,290 28,290 28,290 28,290 28,290 28,290 28,290 28,290 28,290
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,410 29,410 29,410 29,410 29,410 29,410 29,410 29,410 29,410 29,410
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 49,120 49,120 49,120 49,120 49,120 49,120 49,120 49,120 49,120 49,120
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 633,324 633,324 633,324 633,324 633,324 633,324 633,324 633,324 633,324 633,324
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 326,248 326,248 326,248 326,248 326,248 326,248 326,248 326,248 326,248 326,248
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 92,692 92,692 92,692 92,692 92,692 92,692 92,692 92,692 92,692 92,692
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,916 1,916 1,916 1,916 1,916 1,916 1,916 1,916 1,916 1,916
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,830 8,830 8,830 8,830 8,830 8,830 8,830 8,830 8,830 8,830
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,106 13,106 13,106 13,106 13,106 13,106 13,106 13,106 13,106 13,106
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,825 21,825 21,825 21,825 21,825 21,825 21,825 21,825 21,825 21,825
21.43 CABLE TELEVISIÓN RG6 ML ### 4,068 4,068 4,068 4,068 4,068 4,068 4,068 4,068 4,068 4,068
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,640 23,640 23,640 23,640 23,640 23,640 23,640 23,640 23,640 23,640
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,234 34,234 34,234 34,234 34,234 34,234 34,234 34,234 34,234 34,234
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,302 20,302 20,302 20,302 20,302 20,302 20,302 20,302 20,302 20,302
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN) ML ### 15,995 15,995 15,995 15,995 15,995 15,995 15,995 15,995 15,995 15,995
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 636,857 636,857 636,857 636,857 636,857 636,857 636,857 636,857 636,857 636,857
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
p URBANISMO
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 27,992 27,992 27,992 27,992 27,992 27,992 27,992 27,992 27,992 27,992
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 93,296 93,296 93,296 93,296 93,296 93,296 93,296 93,296 93,296 93,296
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 524,121 524,121 524,121 524,121 524,121 524,121 524,121 524,121 524,121 524,121
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,118,584 1,118,584 1,118,584 1,118,584 1,118,584 1,118,584 1,118,584 1,118,584 1,118,584 1,118,584
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 128,427 128,427 128,427 128,427 128,427 128,427 128,427 128,427 128,427 128,427
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 780,827 780,827 780,827 780,827 780,827 780,827 780,827 780,827 780,827 780,827
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,679,575 1,679,575 1,679,575 1,679,575 1,679,575 1,679,575 1,679,575 1,679,575 1,679,575 1,679,575
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,682 13,682 13,682 13,682 13,682 13,682 13,682 13,682 13,682 13,682
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,810 16,810 16,810 16,810 16,810 16,810 16,810 16,810 16,810 16,810
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,034 21,034 21,034 21,034 21,034 21,034 21,034 21,034 21,034 21,034
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,995 22,995 22,995 22,995 22,995 22,995 22,995 22,995 22,995 22,995
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,511 27,511 27,511 27,511 27,511 27,511 27,511 27,511 27,511 27,511
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,511 27,511 27,511 27,511 27,511 27,511 27,511 27,511 27,511 27,511
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 109,669 109,669 109,669 109,669 109,669 109,669 109,669 109,669 109,669 109,669
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 127,068 127,068 127,068 127,068 127,068 127,068 127,068 127,068 127,068 127,068
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 393,067 393,067 393,067 393,067 393,067 393,067 393,067 393,067 393,067 393,067
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 147,547 147,547 147,547 147,547 147,547 147,547 147,547 147,547 147,547 147,547
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 243,233 243,233 243,233 243,233 243,233 243,233 243,233 243,233 243,233 243,233
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,075,460 1,075,460 1,075,460 1,075,460 1,075,460 1,075,460 1,075,460 1,075,460 1,075,460 1,075,460
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,238,979 1,238,979 1,238,979 1,238,979 1,238,979 1,238,979 1,238,979 1,238,979 1,238,979 1,238,979
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745 14,745
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,037 13,037 13,037 13,037 13,037 13,037 13,037 13,037 13,037 13,037
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,684 31,684 31,684 31,684 31,684 31,684 31,684 31,684 31,684 31,684
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 126,318 126,318 126,318 126,318 126,318 126,318 126,318 126,318 126,318 126,318
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 187,747 187,747 187,747 187,747 187,747 187,747 187,747 187,747 187,747 187,747
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 30,856 30,856 30,856 30,856 30,856 30,856 30,856 30,856 30,856 30,856
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 106,015 106,015 106,015 106,015 106,015 106,015 106,015 106,015 106,015 106,015
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 156,745 156,745 156,745 156,745 156,745 156,745 156,745 156,745 156,745 156,745
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 31,109 31,109 31,109 31,109 31,109 31,109 31,109 31,109 31,109 31,109
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 64,057 64,057 64,057 64,057 64,057 64,057 64,057 64,057 64,057 64,057
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 257,254 257,254 257,254 257,254 257,254 257,254 257,254 257,254 257,254 257,254
1.32 UNIÓN REPARACION PVC 4" UN ### 74,677 74,677 74,677 74,677 74,677 74,677 74,677 74,677 74,677 74,677
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 299,190 299,190 299,190 299,190 299,190 299,190 299,190 299,190 299,190 299,190
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 180,256 180,256 180,256 180,256 180,256 180,256 180,256 180,256 180,256 180,256
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 510,625 510,625 510,625 510,625 510,625 510,625 510,625 510,625 510,625 510,625
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,364,675 1,364,675 1,364,675 1,364,675 1,364,675 1,364,675 1,364,675 1,364,675 1,364,675 1,364,675
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,016,325 2,016,325 2,016,325 2,016,325 2,016,325 2,016,325 2,016,325 2,016,325 2,016,325 2,016,325

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,315 11,315 11,315 11,315 11,315 11,315 11,315 11,315 11,315 11,315
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,910 25,910 25,910 25,910 25,910 25,910 25,910 25,910 25,910 25,910
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 102,373 127,742 103,247 95,374 113,745 108,496 111,995 118,993 124,242 105,871
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 74,433 69,160 62,129 62,129 58,614 58,614 58,614 79,705 74,433 72,675
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 87,105 81,832 71,293 74,802 71,287 71,287 71,287 88,869 83,596 81,839
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 78,806 75,732 82,442 110,244 69,582 69,582 69,582 87,102 94,276 93,251
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 95,263 92,129 87,950 87,950 77,502 85,860 75,413 98,397 95,263 94,218
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 113,878 139,451 114,761 106,825 125,342 120,052 123,579 130,633 135,924 117,407

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 117,220 117,220 117,220 117,220 117,220 117,220 117,220 117,220 117,220 117,220
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### 1,220,235 1,220,235 1,220,235 1,220,235 1,220,235 1,220,235 1,220,235 1,220,235 1,220,235 1,220,235
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ###
p 153,123 153,123 153,123 153,123 153,123 153,123 153,123 153,123 153,123 153,123
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### i 1,413,299 1,413,299 1,413,299 1,413,299 1,413,299 1,413,299 1,413,299 1,413,299 1,413,299 1,413,299
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### o 985,212 985,212 985,212 985,212 985,212 985,212 985,212 985,212 985,212 985,212
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,157 63,157 63,157 63,157 63,157 63,157 63,157 63,157 63,157 63,157
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 116,364 116,364 116,364 116,364 116,364 116,364 116,364 116,364 116,364 116,364
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 274,549 274,549 274,549 274,549 274,549 274,549 274,549 274,549 274,549 274,549
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 440,683 440,683 440,683 440,683 440,683 440,683 440,683 440,683 440,683 440,683
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 116,413 116,413 116,413 116,413 116,413 116,413 116,413 116,413 116,413 116,413
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 116,413 116,413 116,413 116,413 116,413 116,413 116,413 116,413 116,413 116,413
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556 274,556
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 440,683 440,683 440,683 440,683 440,683 440,683 440,683 440,683 440,683 440,683
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 443,376 443,376 443,376 443,376 443,376 443,376 443,376 443,376 443,376 443,376
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 719,166 719,166 719,166 719,166 719,166 719,166 719,166 719,166 719,166 719,166
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,153,998 1,153,998 1,153,998 1,153,998 1,153,998 1,153,998 1,153,998 1,153,998 1,153,998 1,153,998
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 71,430 71,430 71,430 71,430 71,430 71,430 71,430 71,430 71,430 71,430
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 371,216 371,216 371,216 371,216 371,216 371,216 371,216 371,216 371,216 371,216
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 415,537 415,537 415,537 415,537 415,537 415,537 415,537 415,537 415,537 415,537
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,149,656 1,149,656 1,149,656 1,149,656 1,149,656 1,149,656 1,149,656 1,149,656 1,149,656 1,149,656
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 67,602 67,865 67,611 67,529 67,720 67,665 67,702 67,774 67,829 67,638
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 336,636 336,636 336,636 336,636 336,636 336,636 336,636 336,636 336,636 336,636
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 51,251 51,251 51,251 51,251 51,251 51,251 51,251 51,251 51,251 51,251
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 72,401 72,401 72,401 72,401 72,401 72,401 72,401 72,401 72,401 72,401
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 104,390 104,390 104,390 104,390 104,390 104,390 104,390 104,390 104,390 104,390
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 160,199 160,199 160,199 160,199 160,199 160,199 160,199 160,199 160,199 160,199
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 257,290 257,290 257,290 257,290 257,290 257,290 257,290 257,290 257,290 257,290
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 373,699 373,699 373,699 373,699 373,699 373,699 373,699 373,699 373,699 373,699
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 472,767 472,767 472,767 472,767 472,767 472,767 472,767 472,767 472,767 472,767
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 621,570 621,570 621,570 621,570 621,570 621,570 621,570 621,570 621,570 621,570
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 854,570 854,570 854,570 854,570 854,570 854,570 854,570 854,570 854,570 854,570

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO)
UN ### 695,790 714,374 696,430 690,663 704,121 700,276 702,839 707,966 711,811 698,353
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.
4.2 PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML ### 672,744 684,417 673,146 669,524 677,977 675,562 677,171 680,392 682,807 674,354

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON


4.3 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 737,493 749,883 737,921 734,075 743,047 740,484 742,193 745,611 748,174 739,202
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4.4 REFUERZO)
UN ### 825,548 848,779 826,349 819,140 835,962 831,156 834,360 840,769 845,575 828,752
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
4.5 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 952,591 969,029 953,158 948,057 959,960 956,559 958,825 963,361 966,761 954,858

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON


4.6 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 851,443 868,478 852,030 846,743 859,080 855,555 857,905 862,604 866,129 853,792
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,040,509 1,049,317 1,040,812 1,038,081 1,044,456 1,042,634 1,043,850 1,046,279 1,048,101 1,041,725
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,508,615 1,534,430 1,509,504 1,501,496 1,520,185 1,514,845 1,518,407 1,525,526 1,530,867 1,512,177
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,053,119 2,102,191 2,054,812 2,039,581 2,075,116 2,064,963 2,071,733 2,085,270 2,095,423 2,059,887
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,730,350 2,811,922 2,733,165 2,707,846 2,766,917 2,750,040 2,761,293 2,783,794 2,800,671 2,741,601
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,879,633 1,879,633 1,879,633 1,879,633 1,879,633 1,879,633 1,879,633 1,879,633 1,879,633 1,879,633
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,967,418 3,967,418 3,967,418 3,967,418 3,967,418 3,967,418 3,967,418 3,967,418 3,967,418 3,967,418
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 144,191 144,668 144,208 144,060 144,405 144,306 144,372 144,504 144,602 144,257

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 76,461 77,838 76,509 76,081 77,079 76,794 76,984 77,363 77,648 76,651
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ###
p 90,241 91,618 90,289 89,861 90,859 90,574 90,764 91,143 91,428 90,431
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### i 58,536 61,832 58,649 57,626 60,013 59,331 59,786 60,695 61,377 58,990
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### o 63,400 66,653 63,512 62,503 64,858 64,185 64,634 65,531 66,204 63,849
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 63,505 66,645 63,613 62,639 64,913 64,263 64,696 65,563 66,212 63,938
5.6 BORDE SEPARADOR VERDE A-170 ML ### 259,114 259,590 259,130 258,983 259,328 259,229 259,295 259,426 259,525 259,180
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,403 19,799 19,417 19,294 19,580 19,498 19,553 19,662 19,744 19,458
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 41,939 44,262 42,019 41,298 42,980 42,499 42,820 43,461 43,941 42,259
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 85,843 86,097 85,851 85,772 85,957 85,904 85,939 86,009 86,062 85,878
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 577,001 583,943 577,240 575,086 580,113 578,676 579,634 581,549 582,985 577,958
5.11 LOSETA PREFABRICADA A-40 M2 ### 64,718 65,809 64,756 64,418 65,207 64,982 65,132 65,433 65,658 64,869
5.12 LOSETA PREFABRICADA A-60 M2 ### 93,164 94,254 93,201 92,863 93,653 93,427 93,577 93,878 94,104 93,314
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 34,955 36,256 35,000 34,596 35,538 35,269 35,448 35,807 36,076 35,134

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 56,194 58,827 56,285 55,468 57,374 56,829 57,193 57,919 58,464 56,557
5.15 SARDINEL PREFABRICADO A-10 ML ### 104,156 103,814 102,772 102,693 102,479 102,426 102,462 102,930 104,375 103,992
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 62,192 62,852 62,215 62,010 62,488 62,351 62,442 62,624 62,761 62,283

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 208,441 209,990 208,494 208,014 209,135 208,815 209,028 209,456 209,776 208,655
6.2 BANCA EN CONCRETO M-30 UN ### 681,062 683,230 681,137 680,464 682,034 681,585 681,884 682,482 682,931 681,361
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 220,292 220,616 220,303 220,203 220,437 220,370 220,415 220,504 220,571 220,337
6.4 BOLARDO M-60 CONCRETO UN ### 167,056 168,914 167,120 166,543 167,889 167,504 167,761 168,273 168,658 167,312
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 169,035 170,894 169,100 168,523 169,869 169,484 169,740 170,253 170,638 169,292
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 197,668 199,611 197,735 197,132 198,539 198,137 198,405 198,941 199,343 197,936
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 61,726 62,780 61,762 61,435 62,198 61,980 62,126 62,416 62,635 61,871
6.8 BORDILLO PREFABRICADO A-80 ML ### 70,446 71,627 70,487 70,121 70,975 70,731 70,894 71,220 71,464 70,609
6.9 CANECA M-120 UN ### 318,312 318,576 318,321 318,240 318,430 318,376 318,412 318,485 318,540 318,349
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 839,786 840,716 839,818 839,530 840,203 840,011 840,139 840,395 840,587 839,914
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,436,017 3,436,637 3,436,039 3,435,847 3,436,295 3,436,167 3,436,252 3,436,423 3,436,552 3,436,103
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,534,570 3,535,190 3,534,592 3,534,400 3,534,848 3,534,720 3,534,805 3,534,976 3,535,105 3,534,656
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 494,799 495,446 494,821 494,620 495,089 494,955 495,044 495,223 495,357 494,888
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 655,997 658,588 656,086 655,282 657,159 656,623 656,980 657,695 658,231 656,354
6.15 BANCA EN MADERA M-50 UN ### 544,733 544,733 544,733 544,733 544,733 544,733 544,733 544,733 544,733 544,733
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 254,524 255,453 254,556 254,268 254,941 254,748 254,877 255,133 255,325 254,652
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 586,184 586,843 586,207 586,003 586,480 586,344 586,434 586,616 586,753 586,275
6.18 POSTE HISTÓRICO M-131 UN ### 6,530,870 6,535,516 6,531,030 6,529,588 6,532,953 6,531,992 6,532,632 6,533,914 6,534,875 6,531,511

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,104 4,104 4,104 4,104 4,104 4,104 4,104 4,104 4,104 4,104
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,341 44,341 44,341 44,341 44,341 44,341 44,341 44,341 44,341 44,341
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 319,902 320,140 319,910 319,836 320,009 319,960 319,992 320,058 320,107 319,935
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 504,142 505,438 504,187 503,785 504,723 504,455 504,634 504,991 505,259 504,321
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 240,182 240,420 240,190 240,116 240,288 240,239 240,272 240,338 240,387 240,214
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 254,968 255,206 254,976 254,902 255,074 255,025 255,058 255,124 255,173 255,000
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 266,165 266,403 266,173 266,099 266,271 266,222 266,255 266,321 266,370 266,197
7.8 TACHAS REFLECTIVAS UN ### 13,822 13,822 13,822 13,822 13,822 13,822 13,822 13,822 13,822 13,822
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756 14,756
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN)
UN ### 119,936 119,936 119,936 119,936 119,936 119,936 119,936 119,936 119,936 119,936
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
VÍAS (SEGÚN ESPECIFICACIONES
p TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO
1.1 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE


1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE


1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y


1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE


1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,


1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS
M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,954 35,954 35,954 35,954 35,954 35,954 35,954 35,954 35,954 35,954

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y


2.3 210.2.2 PRÉSTAMOS
M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002

2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 EXISTENTE
M2 ### 494 494 494 494 494 494 494 494 494 494

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE


2.8 230.2 MATERIAL ADICIONADO
M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE


2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 66,357 66,357 66,357 66,357 66,357 66,357 66,357 66,357 66,357 66,357

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE


2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 81,523 81,523 81,523 81,523 81,523 81,523 81,523 81,523 81,523 81,523

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO


2.12 600.4 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO


2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE


2.14 600.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO


2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 159,088 153,815 146,785 146,785 143,269 143,269 143,269 146,785 159,088 157,330
3.3 330.1 BASE GRANULAR M3 ### 168,417 163,144 156,113 156,113 152,598 152,598 152,598 156,113 168,417 166,659
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,275 3,275 3,275 3,275 3,275 3,275 3,275 3,275 3,275 3,275
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,144 1,144 1,144 1,144 1,144 1,144 1,144 1,144 1,144 1,144
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
3.7 461.1 ASFÁLTICA M3 ### p 232,599 239,345 232,831 230,738 235,623 234,227 235,158 237,019 238,415 233,529
i
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### o 68,139 69,837 68,197 67,670 68,900 68,549 68,783 69,251 69,603 68,373
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO)
M3 ### 563,468 561,778 576,988 563,468 549,948 553,328 546,568 590,508 571,918 558,398

MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO


3.10 450.2 P ASFÁLTICO) M3 ### 591,103 589,413 604,623 591,103 577,583 580,963 574,203 618,143 599,553 586,033

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO


3.11 450.9 P ASFÁLTICO)
M3 ### 629,662 627,972 643,182 629,662 616,142 619,522 612,762 656,702 638,112 624,592

MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO


3.12 450.3 P ASFÁLTICO)
M3 ### 598,779 597,089 612,299 598,779 585,259 588,639 581,879 625,819 607,229 593,709

3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### 359,832 371,340 339,482 347,640 366,618 355,016 367,993 358,557 364,260 363,961
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 318,328 313,056 306,025 306,025 302,510 302,510 302,510 306,025 318,328 316,571
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 307,919 302,646 295,616 295,616 292,100 292,100 292,100 295,616 307,919 306,161
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 39,214 39,214 39,214 39,214 39,214 39,214 39,214 39,214 39,214 39,214

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 173,611 173,611 173,611 173,611 173,611 173,611 173,611 173,611 173,611 173,611
3.15 311.1 AFIRMADO M3 ### 81,552 76,279 65,740 69,248 65,733 65,733 65,733 83,316 78,043 76,285
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,191 12,674 12,208 12,058 12,408 12,308 12,374 12,508 12,608 12,258
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,927 5,168 4,935 4,860 5,035 4,985 5,018 5,085 5,135 4,960
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 659,687 688,901 660,695 651,629 672,783 666,739 670,769 678,827 684,871 663,717

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE


3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 692,550 723,071 693,603 684,130 706,232 699,917 704,127 712,547 718,862 696,760

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE


3.20 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 714,301 745,662 715,383 705,650 728,360 721,871 726,197 734,848 741,337 718,627

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE


3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,336 7,336 7,336 7,336 7,336 7,336 7,336 7,336 7,336 7,336
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 130,988 126,527 120,578 120,578 105,706 117,604 102,732 135,450 130,988 129,501

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 947,893 981,031 949,036 938,752 962,748 955,892 960,463 969,604 976,460 952,464
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 815,210 847,798 816,334 806,220 829,818 823,077 827,571 836,561 843,303 819,705
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 863,946 897,825 865,114 854,600 879,133 872,124 876,797 886,143 893,152 868,619
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 590,801 621,008 591,844 582,468 604,342 598,092 602,260 610,592 616,842 594,967
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 691,755 723,158 692,838 683,091 705,832 699,335 703,667 712,329 718,827 696,086
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 589,793 621,077 590,872 581,163 603,817 597,345 601,660 610,290 616,762 594,108
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 690,707 723,229 691,828 681,734 705,286 698,558 703,043 712,015 718,744 695,192
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 755,364 786,648 756,443 746,734 769,388 762,916 767,231 775,861 782,333 759,679
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 610,042 642,565 611,163 601,070 624,621 617,893 622,378 631,351 638,079 614,527
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 801,730 834,253 802,852 792,758 816,309 809,581 814,067 823,039 829,767 806,216
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE
4.11 650 P DE ACERO A-36
KG ### 12,295 12,295 12,295 12,295 12,295 12,295 12,295 12,295 12,295 12,295

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE


4.12 650 P DE ACERO A-588 GRADO B
KG ### 15,706 15,706 15,706 15,706 15,706 15,706 15,706 15,706 15,706 15,706
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,845 1,845 1,845 1,845 1,845 1,845 1,845 1,845 1,845 1,845

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,


4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,742,725 2,742,725 2,742,725 2,742,725 2,742,725 2,742,725 2,742,725 2,742,725 2,742,725 2,742,725

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN


4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,278,499 4,335,181 4,280,454 4,262,862 4,303,908 4,292,181 4,299,999 4,315,636 4,327,363 4,286,317
REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4.16 621.2 REFUERZO)
M3 ### 1,779,139 1,810,113 1,780,207 1,770,594 1,793,024 1,786,616 1,790,888 1,799,433 1,805,841 1,783,411
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ### p
U(DM3) 89,121 89,121 89,121 89,121 89,121 89,121 89,121 89,121 89,121 89,121
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### i 371,320 375,037 371,448 370,295 372,986 372,217 372,730 373,755 374,524 371,833
4.19 632 P BARANDA METÁLICA ML ### o 435,096 435,096 435,096 435,096 435,096 435,096 435,096 435,096 435,096 435,096
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,349 17,349 17,349 17,349 17,349 17,349 17,349 17,349 17,349 17,349
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 504,276 533,366 495,661 487,784 509,037 502,347 506,807 526,547 529,992 505,495
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 98,789 94,327 99,923 129,614 85,404 85,404 85,404 104,899 115,310 113,823
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 79,453 74,586 68,096 68,096 64,851 64,851 64,851 84,320 79,453 77,830
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 396,367 429,078 397,495 387,343 411,030 404,263 408,775 417,798 424,566 400,879
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 392,118 409,927 389,002 382,971 391,635 391,941 389,213 406,471 408,870 394,257
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.26 630.7 ELEVACIONES
M3 ### 400,789 418,598 397,673 391,642 400,306 400,612 397,884 415,142 417,541 402,928
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 405,658 422,872 402,523 396,676 404,909 405,338 402,528 419,622 421,896 407,716
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 414,329 431,543 411,194 405,347 413,580 414,009 411,199 428,293 430,567 416,387
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 537,245 568,952 538,339 528,497 551,458 544,899 549,272 558,018 564,578 541,618
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 636,305 669,268 637,442 627,211 651,082 644,262 648,808 657,901 664,721 640,851
4.31 681.1 GAVIÓN M3 ### 220,414 216,155 210,476 210,476 196,280 207,637 193,441 224,672 220,414 218,994
4.32 681.1 GAVIÓN MALLA PVC M3 ### 224,634 220,375 214,697 214,697 200,501 211,858 197,662 228,893 224,634 223,214
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4.33 672.1 2500 PSI
ML ### 44,133 46,080 44,201 43,596 45,006 44,603 44,872 45,409 45,811 44,402

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE


4.34 672.1 E, 2500 PSI ML ### 16,917 17,891 16,951 16,649 17,354 17,152 17,287 17,555 17,756 17,052

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO


4.35 *** (RESISTENCIA ÚLTIMA 25 KN)
M2 ### 10,365 10,365 10,365 10,365 10,365 10,365 10,365 10,365 10,365 10,365

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,722 14,722 14,722 14,722 14,722 14,722 14,722 14,722 14,722 14,722

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,768 19,768 19,768 19,768 19,768 19,768 19,768 19,768 19,768 19,768

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.38 *** (RESISTENCIA ÚLTIMA 100 KN)
M2 ### 23,671 23,671 23,671 23,671 23,671 23,671 23,671 23,671 23,671 23,671

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 30,377 30,377 30,377 30,377 30,377 30,377 30,377 30,377 30,377 30,377

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800


4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,439 7,439 7,439 7,439 7,439 7,439 7,439 7,439 7,439 7,439

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,463 8,463 8,463 8,463 8,463 8,463 8,463 8,463 8,463 8,463

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,792 8,792 8,792 8,792 8,792 8,792 8,792 8,792 8,792 8,792

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700


4.43 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,292 6,292 6,292 6,292 6,292 6,292 6,292 6,292 6,292 6,292

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100


4.44 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400


4.45 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,705 7,705 7,705 7,705 7,705 7,705 7,705 7,705 7,705 7,705

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400


4.46 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000


4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 18,025 18,025 18,025 18,025 18,025 18,025 18,025 18,025 18,025 18,025

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO


4.48 661.1 Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### 642,320 642,728 642,334 642,208 642,503 642,419 642,475 642,587 642,672 642,377

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,


4.49 660.3 DIÁMETRO 600 MM
ML ### 368,723 375,677 368,963 366,805 371,840 370,402 371,361 373,279 374,718 369,682

SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,


4.50 *** DIÁMETRO 36"
ML ### 897,520 897,520 897,520 897,520 897,520 897,520 897,520 897,520 897,520 897,520
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
uPROVINCIA: SABANA OCCIDENTE
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
i
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ###
p 152,402 147,332 137,199 140,572 137,192 137,192 137,192 154,099 149,029 147,339
SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 i
4.52 640.1 PSI
KG ### o 4,517 4,517 4,517 4,517 4,517 4,517 4,517 4,517 4,517 4,517

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E


4.53 *** INSTALACIÓN) ML ### 87,280 87,280 87,280 87,280 87,280 87,280 87,280 87,280 87,280 87,280

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E


4.54 *** INSTALACIÓN)
ML ### 132,941 132,941 132,941 132,941 132,941 132,941 132,941 132,941 132,941 132,941
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 543,381 576,343 544,518 534,287 558,157 551,338 555,884 564,977 571,797 547,927
4.56 682.1 P COLCHONETA RENO M3 ### 237,090 232,831 227,152 227,152 212,956 224,313 210,117 241,348 237,090 235,670
4.57 *** TRINCHO EN MADERA M2 ### 69,146 69,146 69,146 69,146 69,146 69,146 69,146 69,146 69,146 69,146

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,104 4,104 4,104 4,104 4,104 4,104 4,104 4,104 4,104 4,104
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,341 44,341 44,341 44,341 44,341 44,341 44,341 44,341 44,341 44,341
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 85,161 85,161 85,161 85,161 85,161 85,161 85,161 85,161 85,161 85,161
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 70,893 70,893 70,893 70,893 70,893 70,893 70,893 70,893 70,893 70,893
5.5 730.1 DEFENSA METÁLICA ML ### 151,278 152,850 151,332 150,844 151,983 151,658 151,874 152,308 152,633 151,495
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES UN ### 13,822 13,822 13,822 13,822 13,822 13,822 13,822 13,822 13,822 13,822

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 858 858 858 858 858 858 858 858 858 858
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
6.2 801.6 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847
UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE


6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067

6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,319 15,319 15,319 15,319 15,319 15,319 15,319 15,319 15,319 15,319
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,756 24,756 24,756 24,756 24,756 24,756 24,756 24,756 24,756 24,756
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,436 9,436 9,436 9,436 9,436 9,436 9,436 9,436 9,436 9,436

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
CONSTRUCCIÓN p
1 PRELIMINARES i
o
1.1 CAMPAMENTO 18 M2 UN ### 1,961,668 1,956,177
1.2 CAMPAMENTO 9 M2 UN ### 1,151,642 1,148,897
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,340 14,340
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,068 16,068
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 18,617 18,617
1.6 CERCA EN TABLA H=2.30 M ML ### 64,431 64,431
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 45,150 45,090
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 21,025 20,965
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 877,722 877,613
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN M2 ### 10,174 10,174
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,687 3,687
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,617,386 2,617,386
1.44 RED TELEFÓNICA PROVISIONAL UN ### 244,579 244,579
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 71,305 71,305
2.2 BASE ARENA CEMENTO 1:20 M3 ### 175,965 170,601
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ###
p 217,047 217,047
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### i 21,741 21,741
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### o 613,931 608,075
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 616,103 610,035
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 575,165 569,483
2.9 PILOTE DE MADERA D=20 CM ML ### 50,485 50,485
2.10 PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 155,810 155,810

2.11 PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 192,467 192,467

2.12 PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 236,796 236,796

2.13 PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 296,470 296,470
2.14 PILOTE HINCADO 25X25 ML ### 103,394 102,981
2.15 PILOTE HINCADO 30X30 ML ### 126,557 125,958
2.16 DADOS EN CONCRETO 3500PSI M3 ### 560,166 554,485
2.17 MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML ### 93,244 93,244

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 38,059 38,026
3.2 SIFÓN EN PVC 6" UN ### 192,493 192,460
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 426,040 428,078
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 220,927 220,661
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 249,378 248,879
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 324,184 322,957
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 107,857 107,906
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,243,053 1,243,540
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 113,836 113,467
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 71,146 70,952
3.11 TUBERÍA DRENAJE PVC 110 ML ### 27,606 27,491
3.12 TUBERÍA DRENAJE PVC 160 ML ### 44,090 43,975
3.13 TUBERÍA DRENAJE PVC 200 ML ### 57,646 57,484
3.14 TUBERÍA DRENAJE PVC 250 ML ### 78,587 78,403
3.15 TUBERÍA DRENAJE PVC 315 ML ### 108,374 108,212
3.16 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN ### 928,462 926,617
3.17 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,307,107 1,303,416
3.18 SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN ### 1,696,134 1,688,751

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 41,596 41,596
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 54,611 54,611
4.3 COLUMNAS 3500 PSI M3 ### 784,078 778,396
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 215,630 212,737
4.5 ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 94,444 93,892

4.6 ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 111,059 110,397
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### 125,953 125,070
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 132,823 131,885
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 151,439 150,281
4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 168,127 166,803
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 186,505 185,015
4.12 ENTREPISO VIGUETA PLACA M2 ### 98,018 97,921
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
4.13 ESCALERA MACIZA 3500 PSI M3 ###
p 929,812 924,131
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### i 93,087 93,007
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### o 76,624 76,056
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 85,794 85,099
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 99,523 98,651
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 684,282 678,600
4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 49,687 49,512
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 269,796 267,259
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,095 4,095
4.22 ACERO FIGURADO 60000 PSI KG ### 4,294 4,294
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,171 6,171
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 837,797 832,115
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 754,942 748,723
4.26 VIGA AÉREA 3500 PSI M3 ### 827,896 822,215
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 806,568 800,887
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,028,741 1,023,060
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 289,276 282,992

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 29,873 29,723
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 51,359 51,209
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 35,663 35,630
5.4 ARCOS EN LADRILLO PRENSADO ML ### 167,124 167,057
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 44,230 44,055
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,210 27,130
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 97,311 97,178
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 87,910 87,327
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 91,553 91,553
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 54,175 54,175
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 88,294 88,294
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 52,546 52,546
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 101,535 101,535
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 60,567 60,567
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 112,593 112,593
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 66,096 66,096
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 40,635 40,568
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 24,890 24,856
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 52,494 52,450
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 31,949 31,927
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 59,111 59,066
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 35,971 35,949
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 97,860 97,637
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 58,554 58,442
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 37,377 37,332
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 22,908 22,886
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 73,913 73,823
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 45,077 45,033
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 86,615 86,535
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 53,206 53,166
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 178,552 178,239
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 108,773 108,617
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 88,627 88,460
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 54,212 54,129
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ###
p 46,527 46,427
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### i 28,668 28,618
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### o 33,927 33,882
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 20,892 20,869
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 50,576 50,486
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 31,416 31,371
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 97,362 97,228
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 60,074 60,007
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 71,192 71,103
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 43,474 43,429
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 148,781 148,468
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 91,690 91,534
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 31,883 31,850
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 36,301 36,181
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 61,450 61,290
5.50 LAVADA DE FACHADA M2 ### 5,506 5,506
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 51,729 51,579
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,082 11,082
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,427 14,427
5.54 ANCLAJE 1/2" L=50CM UN ### 18,787 18,787
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 25,938 25,938
5.56 ANCLAJE 3/4" L=70CM UN ### 38,190 38,190
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 4,798 4,755

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 16,810 16,810
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,850 5,816
6.3 FILOS O DILATACIONES S/MURO ML ### 7,107 7,073
6.4 GOTERA EN MORTERO 1:4 ML ### 8,371 8,338
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 6,821 6,821
6.6 MALLA BAJO ENTRAMADO M2 ### 14,111 14,111
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 24,948 24,831
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,224 15,165
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,408 21,314
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,125 13,078
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 20,823 20,706
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,832 12,774
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,408 21,314
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,125 13,078
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 21,861 21,778
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,350 13,309
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 17,882 17,811
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,056 11,021
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,437 17,348
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,833 10,789
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 22,233 22,139
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,516 13,469
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,648 21,531
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,224 13,165
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,084 17,995
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,138 11,094
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,591 22,474
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,124 14,065
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
p
7 CUBIERTAS i
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### o 27,048 26,914
7.2 AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### 80,971 80,679
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 54,406 54,406
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 22,148 22,148
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 34,608 34,608
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 79,101 79,101
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 62,230 62,230
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 36,755 36,755
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 82,832 82,832
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 98,648 98,648
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 144,345 144,345
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 58,024 58,024
7.13 CANAL PVC AMAZONAS ML ### 81,182 81,182
7.14 CANAL PVC RAINGO ML ### 74,048 74,048
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 129,049 129,049
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 75,049 75,049
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 55,416 55,416
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 32,676 32,676
7.19000000000001 TEJA DE BARRO M2 ### 59,388 59,221
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 46,159 46,159
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 42,389 42,389
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 36,573 36,573
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 35,740 35,740
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 35,999 35,999
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 49,988 49,988
7.26 TEJA PLÁSTICA No.6 M2 ### 44,113 44,113
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 79,800 79,800
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 146,175 146,175
7.29000000000001 TEJA SIN TRASLAPO M2 ### 66,152 66,152
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 43,427 43,427
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 33,712 33,712
7.32 ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM) M2 ### 57,451 57,451
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 20,511 20,511
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 24,399 24,399
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 26,231 26,231
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 33,409 33,409
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 22,393 22,393
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 52,540 52,540
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 343,782 343,782
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 415,965 415,965
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 266,156 266,156
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 282,971 282,971

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 415,429 409,435
8.2 CONCRETO 3500 PSI M3 ### 362,376 356,860
8.3 CONCRETO 3000 PSI M3 ### 360,534 354,849
8.4 CONCRETO 2500 PSI M3 ### 316,848 311,016
8.5 CONCRETO 2000 PSI M3 ### 293,893 287,929
8.6 CONCRETO 1500 PSI M3 ### 264,833 258,732
8.7 MORTERO SECO 1:10 M3 ### 221,079 216,481
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ###
p 430,224 425,759
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### i 402,367 396,810
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### o 461,573 456,376
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 678,893 673,696

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 121,984 121,984
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 3,884 3,850
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 137,523 137,523
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 167,273 167,273
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 238,783 238,783
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 265,503 265,503
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 292,258 292,258
9.8 HOJA PUERTA FORTEC 0.81 UN ### 193,460 193,460
9.9 HOJA PUERTA FORTEC 0.91 UN ### 219,124 219,124
9.10 HOJA PUERTA FORTEC 1.50 UN ### 321,778 321,778
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 122,885 122,885
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 162,663 162,663
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 180,628 180,628
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 457,796 457,796
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 42,027 42,027
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 26,775 26,775
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 99,457 99,457
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 117,502 117,502
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 91,453 91,453
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 28,885 28,885
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 28,885 28,885
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 27,422 27,422
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 42,153 42,153
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 51,873 51,873
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 62,241 62,241
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 74,553 74,553
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 347,101 347,101
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 243,420 243,420
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 33,728 33,728
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 42,800 42,800
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 51,873 51,873
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 64,832 64,832

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 75,642 75,642
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 205,969 205,969
10.3 ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO) ML ### 80,771 80,771
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 146,928 146,928
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 136,272 136,272
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 89,520 89,520
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 209,699 209,699
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 109,974 109,974
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,642 6,642
10.10 CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 101,816 101,816
10,10(1) CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 ### 119,585 119,585
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 41,847 41,847
10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 523,362 523,362
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ###
p 189,709 189,709
10.14 PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 ### i 215,636 215,636
10.15 DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### o 478,884 478,884
10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 130,484 130,484
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 380,859 380,859
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,049 6,049
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 269,659 269,659
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 123,669 123,669
10.21 REJILLA PISO 0.30 M M2 ### 85,529 85,529
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 88,706 88,706
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES,
10.23 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 10,714 10,714
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS,


10.24 TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 11,826 11,826
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS,


10.25 CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,516 9,516
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 224,364 224,364
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 268,152 268,152
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 22,148 22,148
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 34,608 34,608
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 33,484 33,484
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 42,660 42,660
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 87,208 87,208
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 225,668 225,668
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,833 46,833
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 35,672 35,672
11.13 NIPLE PASAMURO 2" UN ### 68,829 68,829
11.14 NIPLE PASAMURO 4" UN ### 102,543 102,543
11.15 PUNTO AGUA CALIENTE CPVC UN ### 85,571 85,571
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 63,707 63,707
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 67,463 67,463
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 85,183 85,183
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 67,827 67,827
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 83,860 83,860
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 89,415 89,415
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 72,979 72,979
11.23 RED SUMINISTRO CPVC 1/2" ML ### 12,478 12,478
11.24 RED SUMINISTRO CPVC 3/4" ML ### 17,370 17,370
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 22,720 22,720
11.26 RED SUMINISTRO PVC 1" ML ### 14,156 14,156
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,539 8,539
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 50,121 50,121
11.29 RED SUMINISTRO PVC 2" ML ### 32,224 32,224
11.30 RED SUMINISTRO PVC 3/4" ML ### 10,637 10,637
11.31 RED SANITARIA PVC-S 2" ML ### 25,074 25,074
11.32 RED SANITARIA PVC-S 3" ML ### 34,637 34,637
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
11.33 RED SANITARIA PVC-S 4" ML ###
p 46,900 46,900
11.34 RED SANITARIA PVC-S 6" ML ### i 86,623 86,623
11.35 REGISTRO 1" UN ### o 106,145 106,145
11.36 REGISTRO 1/2" UN ### 59,336 59,336
11.37 REGISTRO 3/4" UN ### 75,145 75,145
11.38 REGISTRO 1 1/2" UN ### 180,313 180,313
11.39 REGISTRO 2 1/2" UN ### 369,909 369,909
11.40 REGISTRO 2" UN ### 274,075 274,075
11.41 REVENTILACIÓN 2" ML ### 17,591 17,591
11.42 REVENTILACIÓN 3" ML ### 22,159 22,159
11.43 TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 172,138 172,138
11.44 TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN ### 278,450 278,450
11.45 TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN ### 462,073 462,073
11.46 TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 39,812 39,812
11.47 TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 46,895 46,895
11.48 TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 60,829 60,829
11.49 TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 68,418 68,418
11.50 TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 88,074 88,074
11.51 TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 103,211 103,211
11.52 TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML ### 153,024 153,024
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 62,268 62,268
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 62,511 62,511
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 39,717 39,717
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 48,648 48,648
11.57 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML ### 4,077 4,077
11.58 PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML ### 6,390 6,390
11.59 GABINETE TIPO III UN ### 993,011 993,011
11.60 GABINETE TIPO I UN ### 762,294 762,294
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,525,278 2,525,278
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,107,904 2,107,904
11.63 VÁLVULA MARIPOSA 3" UN ### 622,281 622,281
11.64 VÁLVULA MARIPOSA 4" UN ### 800,900 800,900
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 303,884 303,884

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 357,279 357,279
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 56,740 56,740
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 66,956 66,956
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 74,599 74,599
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 87,588 87,588
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 53,479 53,479
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 60,850 60,850
12.8 STRIP TELEFÓNICO 10 PARES UN ### 141,866 141,866
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 54,815 54,815
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 125,676 125,676
12.11 SALIDA T.V PVC COMPLETA. UN ### 75,404 75,404
12.12 SALIDA BIFÁSICA C.N. UN ### 44,675 44,675
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 94,795 94,795
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 405,397 405,397
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 538,639 538,639
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,483 3,483
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,607 4,607
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,145 7,145
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ###
p 12,798 12,798
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### i 268,241 268,241
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### o 76,247 76,247
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 102,447 102,447
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 43,100 43,100
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,384,890 1,384,890
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,026,698 1,026,698
12.26 POSTE METÁLICO 6M UN ### 1,260,981 1,260,981
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 583,464 583,464
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 108,198 108,198
12.29 LUMINARIA 70W SODIO UN ### 489,030 489,030
12.30 LUMINARIA 150W SODIO UN ### 611,094 611,094
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,609,466 1,609,466
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,186,014 1,186,014

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 39,762 39,562
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 38,870 38,670
13.3 ALISTADO PARA LISTÓN M2 ### 15,112 15,072
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 27,511 27,111
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 82,972 82,572
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,200 27,080
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 55,583 55,000
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 75,772 74,839
13.9 MANTO FIBERGLASS 600X1 M2 ### 30,229 30,229
13.10 PEGANTE MORTERO-CONCRETO M2 ### 23,435 23,435
13.11 PERMA PLY 2 CAPAS M2 ### 27,690 27,690
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 44,806 44,281
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 52,247 51,605
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 75,040 74,048
13.15 TRITURADO FINO 1/2 M3 ### 79,799 75,574
13.16 TRITURADO GRUESO 3/4 M3 ### 85,706 83,593

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 57,324 57,244
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 34,671 34,631
14.3 ADOQUÍN CONCRETO 6CM M2 ### 65,441 65,241
14.4 ADOQUÍN CONCRETO 8CM M2 ### 68,641 68,441
14.5 ADOQUÍN GRES PEATONAL M2 ### 72,904 72,704
14.6 BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO M2 ### 74,798 74,718
14.7 GRAVILLA PARA GRADAS ML ### 39,174 39,104
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 161,952 161,592
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 48,019 47,840
14.10 GUARDAESCOBA EN GRANITO ML ### 45,402 45,402
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,387 10,318
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,223 9,223
14.13 GUARDAESCOBA PVC CEDRO ML ### 12,331 12,331
14.14 GUARDAESCOBA PINO CARIBE ML ### 10,692 10,692
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 17,563 17,563
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 33,731 33,731
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,726 9,726
14.18 LISTÓN M.H. AMARILLO M2 ### 75,029 75,029
14.19 PASO ESCALERA GRANITO ML ### 119,961 119,681
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
14.20 PIRLANES ALUMINIO ML ###
p 8,050 8,050
14.21 PIRLANES LADRILLO ML ### i 32,880 32,814
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### o 45,548 45,548
14.23 PISO VINILO TRÁFICO PESADO M2 ### 52,692 52,692
14.24 PULIDA LACADA PISO MADERA M2 ### 50,040 50,040
14.25 TABLETA DE GRES 25X25 M2 ### 49,871 49,791
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 55,739 55,659
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,397 11,397
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 49,684 49,584
14.29 JABONERA PORCELANA ACUARIO UN ### 20,540 20,540
14.30 JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 121,975 121,975
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,383 10,383
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 22,551 22,551
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 14,746 14,746
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,348 14,348
14.35 REMATES BOCEL ALUMINIO ML ### 8,994 8,994
14.36 REMATES BOCEL PORCELANA ML ### 9,138 9,138
14.37 TAPA REGISTRO 20X20 UN ### 19,223 19,223
14.38 TAPA REGISTRO 6X6 UN ### 17,587 17,587
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 18,093 18,093
14.40 DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 ### 20,916 20,916
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 64,771 64,691
14.42 MEDIA CAÑA EN GRANITO ML ### 75,853 75,853
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,366 36,366
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,437 13,437
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 98,815 98,815
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 120,314 120,314

15 CIELO RASO
15.1 APLIQUE YESO ML ### 71,378 71,378
15.2 ARMADURA MADERA Y MALLA M2 ### 37,542 37,542
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 56,121 56,121
15.4 CIELO RASO DURACUSTIC M2 ### 68,300 68,300
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 51,199 51,199
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 93,885 93,885
15.7 CORNISAS YESO ML ### 47,760 47,760
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 103,233 103,233
15.9 MALLA CON VENA M2 ### 14,019 14,019

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
16.2 MENOR DE 5 KM) M3 ### 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 52,599 52,599
16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578
16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 57,303 63,632
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 68,078 64,809
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 146,396 150,856
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
16.11 AFRIMADO (NORMA INVIAS 311) M3 ###
p 60,460 60,460
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### i 125,591 140,373
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### o 142,830 147,290

17 APARATOS SANITARIOS
17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 297,054 297,054
17.2 SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 866,917 866,917
17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 471,621 471,621
17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 140,636 140,636
17.5 SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN ### 194,271 194,271
17.6 SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN ### 180,759 180,759
17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 392,192 392,192
17.8 SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN ### 996,187 996,187
17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 286,201 286,201
17.10 SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN ### 204,667 204,667
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 84,099 84,099
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE
17.12 ACCESORIOS Y GRIFERÍA)
UN ### 246,166 246,166

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE


17.13 ACCESORIOS Y GRIFERÍA)
UN ### 360,370 360,370

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,551 8,551
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,133 3,133
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,580 11,580
18.4 BARNIZ SOBRE MUEBLES M2 ### 42,875 42,875
18.5 CARBURO SOBRE PAÑETES M2 ### 6,058 6,058
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 64,129 64,129
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,632 3,632
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,826 2,826
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,329 14,329
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,125 4,125
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,097 15,097
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 5,740 5,740
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,569 6,569
18.14 ESTUCO M2 ### 7,338 7,338
18.15 ESTUCO (LINEAL) ML ### 4,618 4,618
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,000 16,000
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 9,992 9,992
18.18 LACA PISOS MADERA M2 ### 23,767 23,767
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,781 2,781
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,217 12,217
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,308 3,308
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 12,917 12,917
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,292 7,292
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,622 4,622
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 21,976 21,976
18.26 PINTURA EPÓXICA M2 ### 13,144 13,144
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,172 8,172

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 5,875,218 5,875,218
19.2 CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 10,380,716 10,380,716
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ###
p 2,717,180 2,717,180
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### i 8,878,659 8,878,659
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### o 8,311,845 8,311,845
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,781 2,781
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 836,710 836,710
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 83,207 83,207
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,509,437 1,509,377
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 658,170 656,749

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 29,260 29,260
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 43,157 43,157
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 53,403 53,403
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 17,682 17,682
20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 21,345 21,345
20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 28,990 28,990
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 26,363 26,363
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 27,787 27,787
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 34,641 34,641
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 17,412 17,412
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 22,746 22,746
20.12 VÁLVULA DE BOLA GAS 1" UN ### 34,819 34,819
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 264,998 264,998
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 304,792 304,792
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 318,174 318,174
20.16 ACOMETIDA GAS 1/2" ML ### 296,432 296,432

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 216,452 216,452
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 32,938 32,938
21.3 SIRENA DE 110 V UN ### 101,822 101,822
21.4 CÁMARA CCTV UN ### 264,643 264,643
21.5 PARLANTE-CIELO FALSO UN ### 52,020 52,020
21.6 AMPLIFICADOR 100W UN ### 562,932 562,932
21.7 AMPLIFICADOR 300W UN ### 1,382,456 1,382,456
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,288 47,288
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 215,713 215,713
21.10 TOMA PARA MICRÓFONO UN ### 44,508 44,508
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,724 3,724
21.12 SPLITERS UN ### 6,160 6,160
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,304 19,304
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,157 25,157
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 32,554 32,554
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 120,266 120,266
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 31,413 31,413
21.18 BANDEJA PORTACABLES PARA RACK UN ### 102,035 102,035
21.19 RACK 2' X 24" UN ### 186,317 186,317
21.20 RACK 3' X 24" UN ### 287,688 287,688
21.21 RACK 5' X 24" UN ### 359,675 359,675
21.22 RACK 7' X 24" UN ### 391,755 391,755
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 580,894 580,894
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 344,276 344,276
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 102,013 102,013
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
21.26 PATCH CORD 2M CATEGORÍA 6A UN ###
p 13,476 13,476
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### i 27,462 27,462
21.28 CABLE UTP CATEGORÍA 6A ML ### o 5,010 5,010
21.29 CANALETA METÁLICA 4X6 CMS ML ### 35,633 35,633
21.30 CANALETA METÁLICA 4X10 CMS ML ### 37,162 37,162
21.31 CANALETA METÁLICA 6X10 CMS ML ### 37,926 37,926
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 24,770 24,770
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 27,285 27,285
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 28,341 28,341
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 46,917 46,917
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 602,069 602,069
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 311,364 311,364
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 89,950 89,950
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,850 1,850
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,507 8,507
21.41 CABLE TELEFÓNICO 20 PARES ML ### 12,547 12,547
21.42 CABLE TELEFÓNICO 40 PARES ML ### 20,828 20,828
21.43 CABLE TELEVISIÓN RG6 ML ### 3,911 3,911
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,318 23,318
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 33,560 33,560
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 19,755 19,755
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 15,386 15,386
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 602,436 602,436
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
URBANISMO p
1 ACUEDUCTO i
o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 26,628 26,628
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 88,340 88,340
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 494,788 494,788
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,055,870 1,055,870
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 121,450 121,450
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 736,725 736,725
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,583,763 1,583,763
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,223 13,223
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,171 16,171
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 20,152 20,152
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 22,000 22,000
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 26,257 26,257
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 26,257 26,257
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 103,607 103,607
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 120,086 120,086
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 371,274 371,274
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 139,305 139,305
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 229,650 229,650
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,014,406 1,014,406
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,168,517 1,168,517
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,144 14,144
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 12,534 12,534
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 29,894 29,894
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 119,873 119,873
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 177,767 177,767
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 29,410 29,410
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 100,738 100,738
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 148,549 148,549
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 29,567 29,567
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 60,783 60,783
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 243,276 243,276
1.32 UNIÓN REPARACION PVC 4" UN ### 70,792 70,792
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 282,798 282,798
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 171,365 171,365
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 482,708 482,708
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,286,620 1,286,620
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 1,900,843 1,900,843

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,091 11,091
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,459 25,459
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 64,572 60,374
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 52,011 58,340
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 66,014 66,014
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 69,474 58,201
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 52,971 52,971
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 77,122 72,791

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 110,722 110,722
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ###
p 1,150,359 1,150,359
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### i 144,560 144,560
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### o 1,332,314 1,332,314
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 928,939 928,939
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 62,405 62,405
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 109,917 109,917
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 259,089 259,089
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 259,083 259,083
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 415,741 415,741
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 109,963 109,963
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 109,963 109,963
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 259,089 259,089
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 259,089 259,089
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 415,741 415,741
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 420,291 420,291
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 680,213 680,213
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,090,953 1,090,953
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 67,579 67,579
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 352,282 352,282
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 392,453 392,453
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,086,649 1,086,649
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 63,704 63,659
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 319,692 319,692
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 48,541 48,541
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 68,480 68,480
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 98,631 98,631
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 151,310 151,310
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 242,816 242,816
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 353,767 353,767
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 447,216 447,216
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 587,855 587,855
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 807,449 807,449

4 ALCANTARILLADO - SUMIDEROS Y POZOS


4.1 PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 649,399 645,988
4.2 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 638,298 635,752
4.3 CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 693,220 690,946
4.4 PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN ### 767,889 763,625
4.5 CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 900,251 896,665

4.6 CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 796,682 793,555
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,008,813 1,007,147
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,444,772 1,439,943
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 1,928,616 1,919,567
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,554,319 2,539,277
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,785,727 1,785,727
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,758,460 3,758,460
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y
4.13 DEMOLICIÓN)
UN ### 139,866 139,762

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 71,622 71,389
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ###
p 84,622 84,389
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### i 53,066 52,453
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### o 57,653 57,056
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 57,846 57,267
5.6 BORDE SEPARADOR VERDE A-170 ML ### 244,760 244,656
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 18,681 18,607
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 38,135 37,704
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 81,954 81,898
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 550,765 549,377
5.11 LOSETA PREFABRICADA A-40 M2 ### 61,601 61,363
5.12 LOSETA PREFABRICADA A-60 M2 ### 88,085 87,847
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 32,523 32,284
5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 51,491 51,007
5.15 SARDINEL PREFABRICADO A-10 ML ### 96,650 97,423
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 59,320 59,176

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 196,895 196,610
6.2 BANCA EN CONCRETO M-30 UN ### 642,834 642,436
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 209,588 209,528
6.4 BOLARDO M-60 CONCRETO UN ### 157,979 157,638
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 159,959 159,618
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 186,728 186,370
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 58,531 58,352
6.8 BORDILLO PREFABRICADO A-80 ML ### 65,630 65,430
6.9 CANECA M-120 UN ### 300,956 300,911
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 794,585 794,414
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,242,721 3,242,607
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,335,604 3,335,490
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 466,981 466,862
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 617,422 616,945
6.15 BANCA EN MADERA M-50 UN ### 515,386 515,386
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 242,035 241,865
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 553,016 552,905
6.18 POSTE HISTÓRICO M-131 UN ### 6,159,475 6,158,623

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,875 3,875
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,377 42,377
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 303,061 303,009
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 477,584 477,346
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 229,736 229,684
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 243,671 243,619
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 254,224 254,172
7.8 TACHAS REFLECTIVAS UN ### 13,155 13,155
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,032 14,032
7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN) UN ### 113,494 113,494
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIASp 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE
1.1 201 P 5KM)
M3 ### 157,537 157,537

1.2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 55,330 55,330

1.3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA
1.4 200.2 DE 5KM)
HA ### 968,634 968,634

1.5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y


1.6 *** DERRUMBES
M3-KM### 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


2.1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,822 9,822
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 35,262 35,262
2.3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 ### 494 494
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 MATERIAL ADICIONADO M3 ### 13,186 13,186

2.9 600.1 EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5
2.10 600.2 KM)
M3 ### 65,487 65,487

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE
2.11 600.3 5 KM) M3 ### 80,653 80,653

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.12 600.4 MENOR DE 5 KM) M3 ### 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.13 600.4 P DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA
2.14 600.5 DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA
2.15 600.5 P DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 125,591 140,373
3.3 330.1 BASE GRANULAR M3 ### 142,830 147,290
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE
3.4 365.1 MENOR A 5 Km)
M3 ### 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,114 3,114
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,350 1,350
3.7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 ### 215,507 214,367
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 63,963 63,603
3.9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 548,877 540,427
3.10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 579,582 571,132
3.11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 ### 623,523 615,073
3.12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 ### 610,287 601,837
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### p 387,116 372,721
i
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### o 283,597 288,057
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 265,599 280,381
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 37,437 37,437

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 164,466 164,466
3.15 311.1 AFIRMADO M3 ### 60,460 60,460
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,949 12,869
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,204 5,164
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.18 500.1 UNIÓN
M3 ### 604,577 599,150
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.19 500.1 UNIÓN M3 ### 634,226 628,556
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y
3.20 500.1 UNIÓN
M3 ### 653,945 648,114
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN
3.21 *** DE FONDO Y SELLANTE)
ML ### 7,164 7,164
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 81,970 81,970

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 887,842 881,686
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 757,124 751,070
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 803,904 797,610
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 537,970 532,398
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 636,844 631,052
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 536,109 530,367
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 634,910 628,940
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 701,680 695,938
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 554,576 548,606
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 746,264 740,295
4.11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG ### 12,010 12,010
4.12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B KG ### 15,240 15,240
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,792 1,792
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE
4.14 621.1 REFUERZO Y ANILLOS)
ML ### 2,640,547 2,640,547
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN
4.15 621.1 P CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS) ML ### 4,138,345 4,127,815
4.16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 ### 1,716,779 1,711,094
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3)### 84,943 84,943
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 356,341 355,659
4.19 632 P BARANDA METÁLICA ML ### 420,637 420,637
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 16,590 16,590
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 439,599 433,592
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 84,111 67,751
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 58,693 64,535
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 345,293 339,270
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 343,952 340,374
4.26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 352,623 349,045
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 357,725 354,226
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 366,396 362,897
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 486,562 480,672
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 583,615 577,491
4.31 681.1 GAVIÓN M3 ### 170,488 170,488
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
4.32 681.1 GAVIÓN MALLA PVC M3 ###
p 174,466 174,466
4.33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML ### i 40,932 40,571
4.34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML ### o 15,272 15,091
4.35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN) M2 ### 9,914 9,914
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,021 14,021
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 18,776 18,776
4.38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 ### 22,454 22,454

4.39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 ### 28,776 28,776

4.40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,115 7,115
4.41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,080 8,080
4.42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,391 8,391

4.43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 6,033 6,033

4.44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,989 8,989

4.45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 7,367 7,367

4.46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,989 8,989

4.47 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 17,093 17,093
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE
4.48 661.1 EMBOQUILLADA ML ### 609,538 609,457
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML ### 342,117 340,821
4.50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML ### 850,398 850,398
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 132,032 132,032
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### 4,294 4,294
4.53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 82,587 82,587
4.54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML ### 125,730 125,730
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 488,748 482,624
4.56 682.1 P COLCHONETA RENO M3 ### 186,922 186,922
4.57 *** TRINCHO EN MADERA M2 ### 65,523 65,523

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 3,875 3,875
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 42,377 42,377
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 80,602 80,602
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 67,155 67,155
5.5 730.1 DEFENSA METÁLICA ML ### 142,243 141,963
5.6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN ### 13,155 13,155

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 846 846
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE
6.2 801.6 DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
UN ### 139,847 139,847

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A


6.3 801.7 UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470
6.6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 14,638 14,638
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: SOACHA u
n
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Sibaté Soacha
i
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ###
p 23,534 23,534
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### i 9,143 9,143
o
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN
DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
p CONSTRUCCIÓN
i
1 PRELIMINARES o
1.1 CAMPAMENTO 18 M2 UN ### 2,108,665 2,166,195 2,097,563 2,123,805 2,133,898 2,103,618 2,118,758 2,104,627 2,109,675 2,153,075
1.2 CAMPAMENTO 9 M2 UN ### 1,230,041 1,258,806 1,224,491 1,237,611 1,242,658 1,227,518 1,235,088 1,228,023 1,230,546 1,252,247
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,888 14,888 14,888 14,888 14,888 14,888 14,888 14,888 14,888 14,888
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,688 16,688 16,688 16,688 16,688 16,688 16,688 16,688 16,688 16,688
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,306 19,306 19,306 19,306 19,306 19,306 19,306 19,306 19,306 19,306
1.6 CERCA EN TABLA H=2.30 M ML ### 68,789 68,789 68,789 68,789 68,789 68,789 68,789 68,789 68,789 68,789
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 48,467 49,096 48,346 48,633 48,743 48,412 48,577 48,423 48,478 48,953
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,569 23,198 22,448 22,735 22,845 22,514 22,680 22,525 22,580 23,055
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 945,681 954,956 944,965 949,824 949,833 946,523 949,173 946,335 945,294 953,025
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 PRESICIÓN
M2 ### 10,807 10,807 10,807 10,807 10,807 10,807 10,807 10,807 10,807 10,807
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,934 3,934 3,934 3,934 3,934 3,934 3,934 3,934 3,934 3,934
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,811,112 2,811,112 2,811,112 2,811,112 2,811,112 2,811,112 2,811,112 2,811,112 2,811,112 2,811,112
1.44 RED TELEFÓNICA PROVISIONAL UN ### 260,552 260,552 260,552 260,552 260,552 260,552 260,552 260,552 260,552 260,552
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 77,466 130,194 86,254 121,406 102,073 102,073 119,649 96,800 77,466 121,406
2.2 BASE ARENA CEMENTO 1:20 M3 ### 238,871 304,741 226,158 256,204 267,761 233,092 250,426 234,247 240,025 289,718
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### p 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### i 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
o
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 23,208 23,208 23,208 23,208 23,208 23,208 23,208 23,208 23,208 23,208
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 681,591 743,217 669,699 697,809 708,621 676,185 692,403 677,266 682,673 729,163
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 684,774 748,822 672,414 701,629 712,866 679,156 696,011 680,279 685,898 734,216
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 638,006 697,978 626,433 653,789 664,310 632,746 648,527 633,797 639,059 684,301
2.9 PILOTE DE MADERA D=20 CM ML ### 51,217 51,217 51,217 51,217 51,217 51,217 51,217 51,217 51,217 51,217
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM)
ML ### 158,187 158,187 158,187 158,187 158,187 158,187 158,187 158,187 158,187 158,187

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A


2.11 UNA DISTANCIA MENOR DE 5 KM)
ML ### 197,765 197,765 197,765 197,765 197,765 197,765 197,765 197,765 197,765 197,765

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A


2.12 UNA DISTANCIA MENOR DE 5 KM) ML ### 245,626 245,626 245,626 245,626 245,626 245,626 245,626 245,626 245,626 245,626

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A


2.13 UNA DISTANCIA MENOR DE 5 KM)
ML ### 310,055 310,055 310,055 310,055 310,055 310,055 310,055 310,055 310,055 310,055
2.14 PILOTE HINCADO 25X25 ML ### 109,718 114,101 108,872 110,871 111,640 109,333 110,487 109,410 109,795 113,101
2.15 PILOTE HINCADO 30X30 ML ### 135,722 142,074 134,496 137,393 138,508 135,165 136,836 135,276 135,833 140,625
2.16 DADOS EN CONCRETO 3500PSI M3 ### 623,008 682,980 611,435 638,790 649,312 617,748 633,529 618,799 624,060 669,303
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 MENOR DE 5 KM) ML ### 94,808 94,808 94,808 94,808 94,808 94,808 94,808 94,808 94,808 94,808

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 40,481 40,890 40,402 40,589 40,660 40,445 40,553 40,452 40,488 40,797
3.2 SIFÓN EN PVC 6" UN ### 207,485 207,894 207,406 207,593 207,665 207,449 207,557 207,456 207,492 207,801
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 471,111 516,682 471,227 497,230 491,794 480,849 494,580 478,736 467,347 507,810
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 236,771 245,746 235,790 240,324 240,766 237,142 239,650 237,054 236,543 243,827
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 269,193 283,566 267,600 274,847 275,589 269,752 273,765 269,618 268,840 280,490
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 353,558 375,650 350,476 361,244 363,340 353,441 359,485 353,442 353,341 370,813
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 110,436 110,735 110,486 110,685 110,575 110,575 110,675 110,546 110,386 110,685
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,341,744 1,344,729 1,342,241 1,344,231 1,343,137 1,343,137 1,344,132 1,342,838 1,341,246 1,344,231
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 123,472 127,993 122,599 124,662 125,455 123,075 124,265 123,155 123,551 126,962
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 77,540 79,925 77,080 78,168 78,586 77,331 77,958 77,373 77,582 79,381
3.11 TUBERÍA DRENAJE PVC 110 ML ### 29,467 30,517 29,264 29,743 29,927 29,375 29,651 29,393 29,485 30,277
3.12 TUBERÍA DRENAJE PVC 160 ML ### 47,259 48,309 47,056 47,535 47,719 47,166 47,443 47,185 47,277 48,069
3.13 TUBERÍA DRENAJE PVC 200 ML ### 61,992 63,463 61,709 62,379 62,637 61,863 62,250 61,889 62,018 63,127
3.14 TUBERÍA DRENAJE PVC 250 ML ### 84,714 86,394 84,390 85,156 85,451 84,567 85,009 84,596 84,744 86,011
3.15 TUBERÍA DRENAJE PVC 315 ML ### 116,963 118,433 116,680 117,350 117,608 116,834 117,221 116,860 116,989 118,098
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 FILTRANTE)
UN ### 1,004,671 1,021,473 1,001,429 1,009,093 1,012,040 1,003,197 1,007,619 1,003,492 1,004,966 1,017,641

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL


3.17 FILTRANTE) UN ### 1,421,194 1,454,798 1,414,710 1,430,038 1,435,933 1,418,246 1,427,090 1,418,836 1,421,784 1,447,134

SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL


3.18 FILTRANTE)
UN ### 1,854,665 1,921,871 1,841,695 1,872,351 1,884,142 1,848,769 1,866,455 1,849,948 1,855,844 1,906,545

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 44,289 44,289 44,289 44,289 44,289 44,289 44,289 44,289 44,289 44,289
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 58,409 58,409 58,409 58,409 58,409 58,409 58,409 58,409 58,409 58,409
4.3 COLUMNAS 3500 PSI M3 ### 854,681 914,652 843,108 870,463 880,985 849,420 865,202 850,472 855,733 900,976
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 261,593 306,208 253,599 271,772 285,384 257,503 276,877 258,154 263,080 301,510
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4.5 DE REFUERZO, CONCRETO DE 3500 PSI
M2 ### 103,962 109,785 102,838 105,494 106,516 103,451 104,984 103,553 104,064 108,457

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA


4.6 DE REFUERZO, CONCRETO DE 3500 PSI M2 ### 122,568 129,555 121,220 124,407 125,633 121,955 123,794 122,078 122,691 127,962
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
p
4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 ### i 137,290 146,606 135,493 139,742 141,376 136,473 138,925 136,637 137,454 144,482
o

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### 144,858 154,756 142,947 147,462 149,199 143,989 146,594 144,163 145,031 152,499

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 166,022 178,249 163,662 169,240 171,385 164,949 168,167 165,164 166,236 175,461

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 184,682 198,656 181,986 188,360 190,812 183,457 187,134 183,702 184,928 195,470

4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 ### 205,001 220,722 201,967 209,138 211,896 203,622 207,759 203,898 205,277 217,137

4.12 ENTREPISO VIGUETA PLACA M2 ### 104,352 105,228 104,183 104,583 104,737 104,276 104,506 104,291 104,368 105,029
4.13 ESCALERA MACIZA 3500 PSI M3 ### 1,010,377 1,070,349 998,804 1,026,160 1,036,681 1,005,117 1,020,899 1,006,169 1,011,430 1,056,673
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 100,132 101,009 99,963 100,363 100,516 100,055 100,286 100,070 100,147 100,809
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 83,826 89,823 82,668 85,404 86,456 83,299 84,878 83,405 83,931 88,455
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 94,369 101,706 92,953 96,300 97,587 93,726 95,656 93,854 94,498 100,032
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 110,009 119,209 108,234 112,430 114,044 109,202 111,623 109,364 110,171 117,111
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 749,586 809,558 738,013 765,369 775,890 744,326 760,107 745,377 750,639 795,881

4.19000000000001 PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN ### 52,339 54,193 51,981 52,827 53,152 52,176 52,664 52,209 52,372 53,770

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 297,841 324,624 292,672 304,889 309,588 295,491 302,540 295,961 298,311 318,516
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,390 4,390 4,390 4,390 4,390 4,390 4,390 4,390 4,390 4,390
4.22 ACERO FIGURADO 60000 PSI KG ### 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,485 6,485 6,485 6,485 6,485 6,485 6,485 6,485 6,485 6,485
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 905,145 965,117 893,572 920,928 931,449 899,885 915,667 900,937 906,198 951,441
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 824,937 890,569 812,271 842,209 853,724 819,180 836,451 820,331 826,089 875,602
4.26 VIGA AÉREA 3500 PSI M3 ### 896,236 956,207 884,662 912,018 922,540 890,975 906,757 892,027 897,288 942,531
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 874,944 934,916 863,371 890,727 901,248 869,684 885,465 870,735 875,997 921,239
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,097,903 1,157,875 1,086,330 1,113,686 1,124,207 1,092,643 1,108,424 1,093,694 1,098,956 1,144,198
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 344,916 410,755 332,210 362,242 373,794 339,140 356,467 340,295 346,071 395,741

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 31,727 33,372 31,409 32,160 32,448 31,583 32,015 31,611 31,756 32,997
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 53,314 54,959 52,996 53,746 54,035 53,169 53,602 53,198 53,342 54,584
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 37,197 37,606 37,118 37,304 37,376 37,161 37,269 37,168 37,204 37,513
5.4 ARCOS EN LADRILLO PRENSADO ML ### 173,535 174,353 173,377 173,750 173,894 173,463 173,679 173,478 173,549 174,167
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 46,827 48,681 46,469 47,314 47,640 46,664 47,152 46,696 46,859 48,258
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,857 29,734 28,688 29,088 29,242 28,781 29,011 28,796 28,873 29,534
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 104,979 106,616 104,663 105,410 105,697 104,836 105,266 104,864 105,008 106,243
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 96,414 102,595 95,222 98,041 99,125 95,872 97,499 95,981 96,523 101,185
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 96,282 96,282 96,282 96,282 96,282 96,282 96,282 96,282 96,282 96,282
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 56,540 56,540 56,540 56,540 56,540 56,540 56,540 56,540 56,540 56,540
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 92,746 92,746 92,746 92,746 92,746 92,746 92,746 92,746 92,746 92,746
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,772 54,772 54,772 54,772 54,772 54,772 54,772 54,772 54,772 54,772
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 107,386 107,386 107,386 107,386 107,386 107,386 107,386 107,386 107,386 107,386
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 63,493 63,493 63,493 63,493 63,493 63,493 63,493 63,493 63,493 63,493
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 119,386 119,386 119,386 119,386 119,386 119,386 119,386 119,386 119,386 119,386
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 69,493 69,493 69,493 69,493 69,493 69,493 69,493 69,493 69,493 69,493
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 43,316 44,138 43,157 43,532 43,677 43,244 43,460 43,258 43,330 43,951
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 26,231 26,642 26,151 26,339 26,411 26,194 26,303 26,202 26,238 26,548
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 56,096 56,644 55,990 56,240 56,336 56,047 56,192 56,057 56,105 56,519
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,750 34,024 33,697 33,822 33,870 33,726 33,798 33,731 33,755 33,961
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### p 63,070 63,619 62,965 63,215 63,311 63,022 63,167 63,032 63,080 63,494
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### i 37,951 38,225 37,898 38,023 38,071 37,927 37,999 37,932 37,956 38,163
o
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 105,725 108,466 105,196 106,447 106,928 105,485 106,206 105,533 105,773 107,841
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 62,486 63,857 62,222 62,847 63,088 62,366 62,727 62,390 62,510 63,544
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 39,615 40,163 39,509 39,759 39,856 39,567 39,711 39,577 39,625 40,038
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 24,027 24,301 23,974 24,099 24,148 24,003 24,075 24,008 24,032 24,239
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 78,741 79,838 78,530 79,030 79,222 78,645 78,933 78,664 78,760 79,588
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### 47,491 48,040 47,386 47,636 47,732 47,443 47,588 47,453 47,501 47,915
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 92,830 93,707 92,661 93,061 93,215 92,753 92,984 92,769 92,845 93,507
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 56,314 56,752 56,229 56,429 56,506 56,275 56,391 56,283 56,322 56,652
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 193,259 197,096 192,518 194,268 194,942 192,922 193,932 192,989 193,326 196,221
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 116,127 118,046 115,757 116,632 116,968 115,959 116,463 115,992 116,161 117,608
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 94,052 95,209 93,828 94,356 94,559 93,950 94,255 93,970 94,072 94,945
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,925 57,503 56,813 57,077 57,179 56,874 57,026 56,884 56,935 57,371
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 50,045 51,272 49,808 50,368 50,583 49,937 50,260 49,959 50,066 50,992
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 30,427 31,041 30,308 30,588 30,696 30,373 30,535 30,384 30,438 30,901
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 35,938 36,486 35,832 36,082 36,178 35,890 36,034 35,900 35,948 36,361
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,897 22,171 21,844 21,969 22,017 21,873 21,945 21,878 21,902 22,109
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 54,331 55,428 54,120 54,620 54,812 54,235 54,523 54,254 54,350 55,178
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 33,293 33,842 33,188 33,438 33,534 33,245 33,390 33,255 33,303 33,717
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 104,522 106,166 104,204 104,954 105,243 104,377 104,810 104,406 104,550 105,791
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 63,654 64,476 63,495 63,870 64,015 63,582 63,798 63,596 63,668 64,289
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 76,269 77,365 76,057 76,557 76,750 76,173 76,461 76,192 76,288 77,115
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 46,060 46,608 45,954 46,204 46,301 46,012 46,156 46,022 46,070 46,483
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 161,029 164,867 160,288 162,039 162,712 160,692 161,702 160,760 161,096 163,991
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 97,883 99,801 97,512 98,388 98,724 97,714 98,219 97,748 97,916 99,364
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 33,704 34,113 33,625 33,811 33,883 33,668 33,776 33,675 33,711 34,020
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,060 38,893 37,899 38,279 38,425 37,987 38,206 38,001 38,075 38,703
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,412 65,522 64,197 64,704 64,899 64,314 64,606 64,334 64,431 65,269
5.50 LAVADA DE FACHADA M2 ### 5,556 5,556 5,556 5,556 5,556 5,556 5,556 5,556 5,556 5,556
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 53,695 55,340 53,377 54,128 54,417 53,551 53,984 53,579 53,724 54,965
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,177 11,177 11,177 11,177 11,177 11,177 11,177 11,177 11,177 11,177
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,721 14,721 14,721 14,721 14,721 14,721 14,721 14,721 14,721 14,721
5.54 ANCLAJE 1/2" L=50CM UN ### 19,222 19,222 19,222 19,222 19,222 19,222 19,222 19,222 19,222 19,222
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,825 26,825 26,825 26,825 26,825 26,825 26,825 26,825 26,825 26,825
5.56 ANCLAJE 3/4" L=70CM UN ### 39,890 39,890 39,890 39,890 39,890 39,890 39,890 39,890 39,890 39,890
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,242 5,689 5,156 5,360 5,438 5,203 5,321 5,211 5,250 5,587

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,081 17,081 17,081 17,081 17,081 17,081 17,081 17,081 17,081 17,081
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,282 6,691 6,203 6,390 6,462 6,246 6,354 6,253 6,289 6,598
6.3 FILOS O DILATACIONES S/MURO ML ### 7,539 7,948 7,460 7,647 7,719 7,503 7,611 7,510 7,546 7,855
6.4 GOTERA EN MORTERO 1:4 ML ### 8,881 9,290 8,802 8,989 9,061 8,845 8,953 8,852 8,888 9,197
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,191 7,191 7,191 7,191 7,191 7,191 7,191 7,191 7,191 7,191
6.6 MALLA BAJO ENTRAMADO M2 ### 14,469 14,469 14,469 14,469 14,469 14,469 14,469 14,469 14,469 14,469
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,359 26,169 25,202 25,572 25,714 25,288 25,501 25,302 25,373 25,984
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,429 15,834 15,351 15,536 15,607 15,393 15,500 15,401 15,436 15,742
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,868 24,020 22,646 23,171 23,373 22,767 23,070 22,787 22,888 23,757
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,855 14,431 13,744 14,007 14,108 13,805 13,956 13,815 13,865 14,299
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,234 22,045 21,078 21,447 21,590 21,163 21,376 21,177 21,248 21,860
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,038 13,443 12,960 13,145 13,216 13,002 13,109 13,010 13,045 13,351
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,868 24,020 22,646 23,171 23,373 22,767 23,070 22,787 22,888 23,757
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### p 13,855 14,431 13,744 14,007 14,108 13,805 13,956 13,815 13,865 14,299
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### i 22,556 23,134 22,445 22,708 22,809 22,506 22,657 22,516 22,566 23,002
o
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,698 13,987 13,642 13,774 13,824 13,672 13,748 13,678 13,703 13,921
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,995 19,872 18,825 19,226 19,379 18,918 19,149 18,933 19,010 19,672
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,612 12,051 11,528 11,728 11,805 11,574 11,689 11,582 11,620 11,951
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,750 18,367 17,630 17,912 18,020 17,695 17,858 17,706 17,760 18,226
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 10,990 11,299 10,930 11,071 11,125 10,963 11,044 10,968 10,995 11,228
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### 23,693 24,844 23,471 23,996 24,198 23,592 23,895 23,612 23,713 24,582
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 14,246 14,822 14,135 14,398 14,499 14,196 14,347 14,206 14,256 14,691
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 22,059 22,869 21,903 22,272 22,415 21,988 22,201 22,002 22,073 22,685
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,429 13,834 13,351 13,536 13,607 13,394 13,500 13,401 13,436 13,742
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,397 19,014 18,277 18,559 18,667 18,342 18,505 18,353 18,407 18,873
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,295 11,603 11,235 11,376 11,430 11,267 11,349 11,273 11,300 11,533
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 23,002 23,812 22,845 23,215 23,357 22,931 23,144 22,945 23,016 23,627
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,329 14,734 14,251 14,436 14,507 14,294 14,400 14,301 14,336 14,642

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 29,134 30,778 28,816 29,566 29,855 28,989 29,422 29,018 29,162 30,403
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE)
M2 ### 87,740 90,830 87,143 88,553 89,095 87,469 88,282 87,523 87,794 90,125
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 58,096 58,096 58,096 58,096 58,096 58,096 58,096 58,096 58,096 58,096
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,290 23,290 23,290 23,290 23,290 23,290 23,290 23,290 23,290 23,290
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,522 36,522 36,522 36,522 36,522 36,522 36,522 36,522 36,522 36,522
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 84,772 84,772 84,772 84,772 84,772 84,772 84,772 84,772 84,772 84,772
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 66,468 66,468 66,468 66,468 66,468 66,468 66,468 66,468 66,468 66,468
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,830 38,830 38,830 38,830 38,830 38,830 38,830 38,830 38,830 38,830
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 88,825 88,825 88,825 88,825 88,825 88,825 88,825 88,825 88,825 88,825
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 105,985 105,985 105,985 105,985 105,985 105,985 105,985 105,985 105,985 105,985
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 155,567 155,567 155,567 155,567 155,567 155,567 155,567 155,567 155,567 155,567
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 61,756 61,756 61,756 61,756 61,756 61,756 61,756 61,756 61,756 61,756
7.13 CANAL PVC AMAZONAS ML ### 85,978 85,978 85,978 85,978 85,978 85,978 85,978 85,978 85,978 85,978
7.14 CANAL PVC RAINGO ML ### 78,236 78,236 78,236 78,236 78,236 78,236 78,236 78,236 78,236 78,236
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 138,151 138,151 138,151 138,151 138,151 138,151 138,151 138,151 138,151 138,151
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 80,588 80,588 80,588 80,588 80,588 80,588 80,588 80,588 80,588 80,588
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 59,286 59,286 59,286 59,286 59,286 59,286 59,286 59,286 59,286 59,286
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 34,107 34,107 34,107 34,107 34,107 34,107 34,107 34,107 34,107 34,107
7.19000000000001 TEJA DE BARRO M2 ### 63,575 65,621 63,180 64,113 64,472 63,395 63,934 63,431 63,611 65,154
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 49,411 49,411 49,411 49,411 49,411 49,411 49,411 49,411 49,411 49,411
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 45,320 45,320 45,320 45,320 45,320 45,320 45,320 45,320 45,320 45,320
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,481 38,481 38,481 38,481 38,481 38,481 38,481 38,481 38,481 38,481
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 37,656 37,656 37,656 37,656 37,656 37,656 37,656 37,656 37,656 37,656
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,937 37,937 37,937 37,937 37,937 37,937 37,937 37,937 37,937 37,937
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 53,187 53,187 53,187 53,187 53,187 53,187 53,187 53,187 53,187 53,187
7.26 TEJA PLÁSTICA No.6 M2 ### 46,811 46,811 46,811 46,811 46,811 46,811 46,811 46,811 46,811 46,811
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 85,382 85,382 85,382 85,382 85,382 85,382 85,382 85,382 85,382 85,382

7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 ### 157,293 157,293 157,293 157,293 157,293 157,293 157,293 157,293 157,293 157,293

7.29000000000001 TEJA SIN TRASLAPO M2 ### 70,847 70,847 70,847 70,847 70,847 70,847 70,847 70,847 70,847 70,847
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 45,015 45,015 45,015 45,015 45,015 45,015 45,015 45,015 45,015 45,015
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 35,175 35,175 35,175 35,175 35,175 35,175 35,175 35,175 35,175 35,175
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM)
M2 ### 60,933 60,933 60,933 60,933 60,933 60,933 60,933 60,933 60,933 60,933
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,191 21,191 21,191 21,191 21,191 21,191 21,191 21,191 21,191 21,191
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,411 25,411 25,411 25,411 25,411 25,411 25,411 25,411 25,411 25,411
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### p 27,470 27,470 27,470 27,470 27,470 27,470 27,470 27,470 27,470 27,470
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### i 35,259 35,259 35,259 35,259 35,259 35,259 35,259 35,259 35,259 35,259
o
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,379 23,379 23,379 23,379 23,379 23,379 23,379 23,379 23,379 23,379
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,987 54,987 54,987 54,987 54,987 54,987 54,987 54,987 54,987 54,987
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 371,906 371,906 371,906 371,906 371,906 371,906 371,906 371,906 371,906 371,906
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 430,692 430,692 430,692 430,692 430,692 430,692 430,692 430,692 430,692 430,692
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### 284,072 284,072 284,072 284,072 284,072 284,072 284,072 284,072 284,072 284,072
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### 303,105 303,105 303,105 303,105 303,105 303,105 303,105 303,105 303,105 303,105

8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 482,968 546,490 470,710 499,685 510,829 477,396 494,113 478,511 484,084 532,004
8.2 CONCRETO 3500 PSI M3 ### 422,101 480,326 410,865 437,424 447,639 416,994 432,316 418,015 423,123 467,048
8.3 CONCRETO 3000 PSI M3 ### 420,033 479,864 408,487 435,778 446,275 414,784 430,530 415,834 421,083 466,219
8.4 CONCRETO 2500 PSI M3 ### 375,073 436,878 363,146 391,338 402,181 369,652 385,916 370,736 376,158 422,783
8.5 CONCRETO 2000 PSI M3 ### 350,374 413,274 338,236 366,927 377,962 344,856 361,409 345,960 351,478 398,930
8.6 CONCRETO 1500 PSI M3 ### 318,852 382,774 306,517 335,674 346,889 313,245 330,067 314,366 319,974 368,197
8.7 MORTERO SECO 1:10 M3 ### 279,204 335,664 268,307 294,061 303,966 274,251 289,108 275,240 280,193 322,787
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 499,751 554,574 489,170 514,178 523,796 494,942 509,368 495,903 500,712 542,071
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 421,937 460,527 414,489 432,092 438,863 418,552 428,708 419,229 422,614 451,726
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 486,543 522,635 479,578 496,041 502,373 483,378 492,875 484,011 487,176 514,403
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 722,343 758,435 715,378 731,841 738,173 719,178 728,675 719,811 722,976 750,203

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 129,471 129,471 129,471 129,471 129,471 129,471 129,471 129,471 129,471 129,471
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,388 4,797 4,309 4,496 4,568 4,352 4,460 4,359 4,395 4,704
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 145,176 145,176 145,176 145,176 145,176 145,176 145,176 145,176 145,176 145,176
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 177,455 177,455 177,455 177,455 177,455 177,455 177,455 177,455 177,455 177,455
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 256,687 256,687 256,687 256,687 256,687 256,687 256,687 256,687 256,687 256,687
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 285,620 285,620 285,620 285,620 285,620 285,620 285,620 285,620 285,620 285,620
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 314,589 314,589 314,589 314,589 314,589 314,589 314,589 314,589 314,589 314,589
9.8 HOJA PUERTA FORTEC 0.81 UN ### 208,734 208,734 208,734 208,734 208,734 208,734 208,734 208,734 208,734 208,734
9.9 HOJA PUERTA FORTEC 0.91 UN ### 236,580 236,580 236,580 236,580 236,580 236,580 236,580 236,580 236,580 236,580
9.10 HOJA PUERTA FORTEC 1.50 UN ### 347,964 347,964 347,964 347,964 347,964 347,964 347,964 347,964 347,964 347,964
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 132,158 132,158 132,158 132,158 132,158 132,158 132,158 132,158 132,158 132,158
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 175,319 175,319 175,319 175,319 175,319 175,319 175,319 175,319 175,319 175,319
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 194,811 194,811 194,811 194,811 194,811 194,811 194,811 194,811 194,811 194,811
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 495,546 495,546 495,546 495,546 495,546 495,546 495,546 495,546 495,546 495,546
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,340 44,340 44,340 44,340 44,340 44,340 44,340 44,340 44,340 44,340
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,790 27,790 27,790 27,790 27,790 27,790 27,790 27,790 27,790 27,790
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 104,856 104,856 104,856 104,856 104,856 104,856 104,856 104,856 104,856 104,856
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 126,880 126,880 126,880 126,880 126,880 126,880 126,880 126,880 126,880 126,880
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 98,617 98,617 98,617 98,617 98,617 98,617 98,617 98,617 98,617 98,617
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,729 30,729 30,729 30,729 30,729 30,729 30,729 30,729 30,729 30,729
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,729 30,729 30,729 30,729 30,729 30,729 30,729 30,729 30,729 30,729
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 29,141 29,141 29,141 29,141 29,141 29,141 29,141 29,141 29,141 29,141
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,631 44,631 44,631 44,631 44,631 44,631 44,631 44,631 44,631 44,631
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 55,179 55,179 55,179 55,179 55,179 55,179 55,179 55,179 55,179 55,179
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 66,428 66,428 66,428 66,428 66,428 66,428 66,428 66,428 66,428 66,428
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 79,788 79,788 79,788 79,788 79,788 79,788 79,788 79,788 79,788 79,788
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 374,650 374,650 374,650 374,650 374,650 374,650 374,650 374,650 374,650 374,650
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 262,153 262,153 262,153 262,153 262,153 262,153 262,153 262,153 262,153 262,153
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,492 35,492 35,492 35,492 35,492 35,492 35,492 35,492 35,492 35,492
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,335 45,335 45,335 45,335 45,335 45,335 45,335 45,335 45,335 45,335
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 55,179 55,179 55,179 55,179 55,179 55,179 55,179 55,179 55,179 55,179
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### p 69,241 69,241 69,241 69,241 69,241 69,241 69,241 69,241 69,241 69,241
i
o
10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 80,054 80,054 80,054 80,054 80,054 80,054 80,054 80,054 80,054 80,054
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 221,462 221,462 221,462 221,462 221,462 221,462 221,462 221,462 221,462 221,462
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 (INCLUYE ANTICORROSIVO)
ML ### 84,947 84,947 84,947 84,947 84,947 84,947 84,947 84,947 84,947 84,947
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 152,686 152,686 152,686 152,686 152,686 152,686 152,686 152,686 152,686 152,686
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 143,818 143,818 143,818 143,818 143,818 143,818 143,818 143,818 143,818 143,818
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 94,438 94,438 94,438 94,438 94,438 94,438 94,438 94,438 94,438 94,438
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 222,212 222,212 222,212 222,212 222,212 222,212 222,212 222,212 222,212 222,212
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 115,958 115,958 115,958 115,958 115,958 115,958 115,958 115,958 115,958 115,958
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,969 6,969 6,969 6,969 6,969 6,969 6,969 6,969 6,969 6,969
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2")
M2 ### 105,422 105,422 105,422 105,422 105,422 105,422 105,422 105,422 105,422 105,422

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H:


10,10(1) 2.00 MTS
M2 ### 127,127 127,127 127,127 127,127 127,127 127,127 127,127 127,127 127,127 127,127

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 43,386 43,386 43,386 43,386 43,386 43,386 43,386 43,386 43,386 43,386

10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 ### 564,188 564,188 564,188 564,188 564,188 564,188 564,188 564,188 564,188 564,188
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 203,314 203,314 203,314 203,314 203,314 203,314 203,314 203,314 203,314 203,314
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA
M2 ### 228,916 228,916 228,916 228,916 228,916 228,916 228,916 228,916 228,916 228,916

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE


10.15 PUERTAS Y ACCESORIOS) M2 ### 514,888 514,888 514,888 514,888 514,888 514,888 514,888 514,888 514,888 514,888

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 ### 135,807 135,807 135,807 135,807 135,807 135,807 135,807 135,807 135,807 135,807

10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 411,221 411,221 411,221 411,221 411,221 411,221 411,221 411,221 411,221 411,221
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,362 6,362 6,362 6,362 6,362 6,362 6,362 6,362 6,362 6,362
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 289,701 289,701 289,701 289,701 289,701 289,701 289,701 289,701 289,701 289,701
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 129,134 129,134 129,134 129,134 129,134 129,134 129,134 129,134 129,134 129,134
10.21 REJILLA PISO 0.30 M M2 ### 90,684 90,684 90,684 90,684 90,684 90,684 90,684 90,684 90,684 90,684
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 93,723 93,723 93,723 93,723 93,723 93,723 93,723 93,723 93,723 93,723
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10.23 ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA KG ### 11,126 11,126 11,126 11,126 11,126 11,126 11,126 11,126 11,126 11,126
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA KG ### 12,333 12,333 12,333 12,333 12,333 12,333 12,333 12,333 12,333 12,333
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,827 9,827 9,827 9,827 9,827 9,827 9,827 9,827 9,827 9,827
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 233,720 233,720 233,720 233,720 233,720 233,720 233,720 233,720 233,720 233,720
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 281,227 281,227 281,227 281,227 281,227 281,227 281,227 281,227 281,227 281,227
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,290 23,290 23,290 23,290 23,290 23,290 23,290 23,290 23,290 23,290
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 36,522 36,522 36,522 36,522 36,522 36,522 36,522 36,522 36,522 36,522
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### p 35,115 35,115 35,115 35,115 35,115 35,115 35,115 35,115 35,115 35,115
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### i 44,946 44,946 44,946 44,946 44,946 44,946 44,946 44,946 44,946 44,946
o
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 92,462 92,462 92,462 92,462 92,462 92,462 92,462 92,462 92,462 92,462
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 235,136 235,136 235,136 235,136 235,136 235,136 235,136 235,136 235,136 235,136
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,926 46,926 46,926 46,926 46,926 46,926 46,926 46,926 46,926 46,926
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 37,085 37,085 37,085 37,085 37,085 37,085 37,085 37,085 37,085 37,085
11.13 NIPLE PASAMURO 2" UN ### 70,793 70,793 70,793 70,793 70,793 70,793 70,793 70,793 70,793 70,793
11.14 NIPLE PASAMURO 4" UN ### 105,707 105,707 105,707 105,707 105,707 105,707 105,707 105,707 105,707 105,707
11.15 PUNTO AGUA CALIENTE CPVC UN ### 88,961 88,961 88,961 88,961 88,961 88,961 88,961 88,961 88,961 88,961
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 65,236 65,236 65,236 65,236 65,236 65,236 65,236 65,236 65,236 65,236
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 69,310 69,310 69,310 69,310 69,310 69,310 69,310 69,310 69,310 69,310
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 87,566 87,566 87,566 87,566 87,566 87,566 87,566 87,566 87,566 87,566
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 70,356 70,356 70,356 70,356 70,356 70,356 70,356 70,356 70,356 70,356
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 87,749 87,749 87,749 87,749 87,749 87,749 87,749 87,749 87,749 87,749
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 93,777 93,777 93,777 93,777 93,777 93,777 93,777 93,777 93,777 93,777
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 77,416 77,416 77,416 77,416 77,416 77,416 77,416 77,416 77,416 77,416
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,150 13,150 13,150 13,150 13,150 13,150 13,150 13,150 13,150 13,150
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,459 18,459 18,459 18,459 18,459 18,459 18,459 18,459 18,459 18,459
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 24,111 24,111 24,111 24,111 24,111 24,111 24,111 24,111 24,111 24,111
11.26 RED SUMINISTRO PVC 1" ML ### 14,928 14,928 14,928 14,928 14,928 14,928 14,928 14,928 14,928 14,928
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,942 8,942 8,942 8,942 8,942 8,942 8,942 8,942 8,942 8,942
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 53,573 53,573 53,573 53,573 53,573 53,573 53,573 53,573 53,573 53,573
11.29 RED SUMINISTRO PVC 2" ML ### 34,315 34,315 34,315 34,315 34,315 34,315 34,315 34,315 34,315 34,315
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,181 11,181 11,181 11,181 11,181 11,181 11,181 11,181 11,181 11,181
11.31 RED SANITARIA PVC-S 2" ML ### 26,558 26,558 26,558 26,558 26,558 26,558 26,558 26,558 26,558 26,558
11.32 RED SANITARIA PVC-S 3" ML ### 36,804 36,804 36,804 36,804 36,804 36,804 36,804 36,804 36,804 36,804
11.33 RED SANITARIA PVC-S 4" ML ### 49,916 49,916 49,916 49,916 49,916 49,916 49,916 49,916 49,916 49,916
11.34 RED SANITARIA PVC-S 6" ML ### 93,015 93,015 93,015 93,015 93,015 93,015 93,015 93,015 93,015 93,015
11.35 REGISTRO 1" UN ### 113,225 113,225 113,225 113,225 113,225 113,225 113,225 113,225 113,225 113,225
11.36 REGISTRO 1/2" UN ### 63,166 63,166 63,166 63,166 63,166 63,166 63,166 63,166 63,166 63,166
11.37 REGISTRO 3/4" UN ### 80,319 80,319 80,319 80,319 80,319 80,319 80,319 80,319 80,319 80,319
11.38 REGISTRO 1 1/2" UN ### 193,699 193,699 193,699 193,699 193,699 193,699 193,699 193,699 193,699 193,699
11.39 REGISTRO 2 1/2" UN ### 398,931 398,931 398,931 398,931 398,931 398,931 398,931 398,931 398,931 398,931
11.40 REGISTRO 2" UN ### 294,949 294,949 294,949 294,949 294,949 294,949 294,949 294,949 294,949 294,949
11.41 REVENTILACIÓN 2" ML ### 18,546 18,546 18,546 18,546 18,546 18,546 18,546 18,546 18,546 18,546
11.42 REVENTILACIÓN 3" ML ### 23,395 23,395 23,395 23,395 23,395 23,395 23,395 23,395 23,395 23,395
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN)
UN ### 181,914 181,914 181,914 181,914 181,914 181,914 181,914 181,914 181,914 181,914

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E


11.44 ISNTALACIÓN)
UN ### 295,645 295,645 295,645 295,645 295,645 295,645 295,645 295,645 295,645 295,645

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E


11.45 INSTALACIÓN) UN ### 491,640 491,640 491,640 491,640 491,640 491,640 491,640 491,640 491,640 491,640

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y


11.46 SOPORTES) ML ### 42,373 42,373 42,373 42,373 42,373 42,373 42,373 42,373 42,373 42,373

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE


11.47 ACCESORIOS Y SOPORTES)
ML ### 49,971 49,971 49,971 49,971 49,971 49,971 49,971 49,971 49,971 49,971

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y


11.48 SOPORTES)
ML ### 64,231 64,231 64,231 64,231 64,231 64,231 64,231 64,231 64,231 64,231

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS


11.49 Y SOPORTES)
ML ### 72,809 72,809 72,809 72,809 72,809 72,809 72,809 72,809 72,809 72,809
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE p
11.50 ACCESORIOS Y SOPORTES) ML ### i 93,829 93,829 93,829 93,829 93,829 93,829 93,829 93,829 93,829 93,829
o
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11.51 SOPORTES)
ML ### 108,831 108,831 108,831 108,831 108,831 108,831 108,831 108,831 108,831 108,831

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y


11.52 SOPORTES)
ML ### 160,929 160,929 160,929 160,929 160,929 160,929 160,929 160,929 160,929 160,929

11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 65,106 65,106 65,106 65,106 65,106 65,106 65,106 65,106 65,106 65,106
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 65,369 65,369 65,369 65,369 65,369 65,369 65,369 65,369 65,369 65,369
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 41,956 41,956 41,956 41,956 41,956 41,956 41,956 41,956 41,956 41,956
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 51,646 51,646 51,646 51,646 51,646 51,646 51,646 51,646 51,646 51,646
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA
11.57 2"
ML ### 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A


11.58 2"
ML ### 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,868

11.59 GABINETE TIPO III UN ### 1,062,618 1,062,618 1,062,618 1,062,618 1,062,618 1,062,618 1,062,618 1,062,618 1,062,618 1,062,618
11.60 GABINETE TIPO I UN ### 812,285 812,285 812,285 812,285 812,285 812,285 812,285 812,285 812,285 812,285
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,727,609 2,727,609 2,727,609 2,727,609 2,727,609 2,727,609 2,727,609 2,727,609 2,727,609 2,727,609
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,274,748 2,274,748 2,274,748 2,274,748 2,274,748 2,274,748 2,274,748 2,274,748 2,274,748 2,274,748
11.63 VÁLVULA MARIPOSA 3" UN ### 662,780 662,780 662,780 662,780 662,780 662,780 662,780 662,780 662,780 662,780
11.64 VÁLVULA MARIPOSA 4" UN ### 856,587 856,587 856,587 856,587 856,587 856,587 856,587 856,587 856,587 856,587
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 328,690 328,690 328,690 328,690 328,690 328,690 328,690 328,690 328,690 328,690

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 381,679 381,679 381,679 381,679 381,679 381,679 381,679 381,679 381,679 381,679
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 60,633 60,633 60,633 60,633 60,633 60,633 60,633 60,633 60,633 60,633
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 71,717 71,717 71,717 71,717 71,717 71,717 71,717 71,717 71,717 71,717
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 79,697 79,697 79,697 79,697 79,697 79,697 79,697 79,697 79,697 79,697
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 93,789 93,789 93,789 93,789 93,789 93,789 93,789 93,789 93,789 93,789
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 57,039 57,039 57,039 57,039 57,039 57,039 57,039 57,039 57,039 57,039
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 64,992 64,992 64,992 64,992 64,992 64,992 64,992 64,992 64,992 64,992
12.8 STRIP TELEFÓNICO 10 PARES UN ### 150,435 150,435 150,435 150,435 150,435 150,435 150,435 150,435 150,435 150,435
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 58,545 58,545 58,545 58,545 58,545 58,545 58,545 58,545 58,545 58,545
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 134,469 134,469 134,469 134,469 134,469 134,469 134,469 134,469 134,469 134,469
12.11 SALIDA T.V PVC COMPLETA. UN ### 80,484 80,484 80,484 80,484 80,484 80,484 80,484 80,484 80,484 80,484
12.12 SALIDA BIFÁSICA C.N. UN ### 47,714 47,714 47,714 47,714 47,714 47,714 47,714 47,714 47,714 47,714
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 100,752 100,752 100,752 100,752 100,752 100,752 100,752 100,752 100,752 100,752
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 430,372 430,372 430,372 430,372 430,372 430,372 430,372 430,372 430,372 430,372
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 572,866 572,866 572,866 572,866 572,866 572,866 572,866 572,866 572,866 572,866
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,708 3,708 3,708 3,708 3,708 3,708 3,708 3,708 3,708 3,708
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,898 4,898 4,898 4,898 4,898 4,898 4,898 4,898 4,898 4,898
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,615 7,615 7,615 7,615 7,615 7,615 7,615 7,615 7,615 7,615
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,625 13,625 13,625 13,625 13,625 13,625 13,625 13,625 13,625 13,625
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 286,113 286,113 286,113 286,113 286,113 286,113 286,113 286,113 286,113 286,113
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 80,970 80,970 80,970 80,970 80,970 80,970 80,970 80,970 80,970 80,970
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 109,398 109,398 109,398 109,398 109,398 109,398 109,398 109,398 109,398 109,398
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 45,004 45,004 45,004 45,004 45,004 45,004 45,004 45,004 45,004 45,004
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,468,419 1,468,419 1,468,419 1,468,419 1,468,419 1,468,419 1,468,419 1,468,419 1,468,419 1,468,419
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,088,069 1,088,069 1,088,069 1,088,069 1,088,069 1,088,069 1,088,069 1,088,069 1,088,069 1,088,069
12.26 POSTE METÁLICO 6M UN ### 1,354,373 1,354,373 1,354,373 1,354,373 1,354,373 1,354,373 1,354,373 1,354,373 1,354,373 1,354,373
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 629,832 629,832 629,832 629,832 629,832 629,832 629,832 629,832 629,832 629,832
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 115,453 115,453 115,453 115,453 115,453 115,453 115,453 115,453 115,453 115,453
12.29 LUMINARIA 70W SODIO UN ### 528,294 528,294 528,294 528,294 528,294 528,294 528,294 528,294 528,294 528,294
12.30 LUMINARIA 150W SODIO UN ### 660,737 660,737 660,737 660,737 660,737 660,737 660,737 660,737 660,737 660,737
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### p 1,743,882 1,743,882 1,743,882 1,743,882 1,743,882 1,743,882 1,743,882 1,743,882 1,743,882 1,743,882
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### i 1,284,426 1,284,426 1,284,426 1,284,426 1,284,426 1,284,426 1,284,426 1,284,426 1,284,426 1,284,426
o
13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,455 42,843 41,187 41,820 42,064 41,333 41,699 41,358 41,479 42,527
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,002 42,390 40,734 41,367 41,611 40,880 41,246 40,905 41,026 42,074
13.3 ALISTADO PARA LISTÓN M2 ### 15,510 15,788 15,456 15,583 15,632 15,486 15,559 15,491 15,515 15,724
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 28,557 31,333 28,021 29,288 29,775 28,314 29,044 28,362 28,606 30,700
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 88,310 91,086 87,774 89,040 89,527 88,066 88,797 88,115 88,358 90,453
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 28,459 29,717 28,216 28,790 29,011 28,349 28,680 28,371 28,481 29,430
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 61,586 67,766 60,393 63,212 64,297 61,044 62,670 61,152 61,694 66,357
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 85,368 95,257 83,460 87,971 89,705 84,501 87,103 84,674 85,542 93,002
13.9 MANTO FIBERGLASS 600X1 M2 ### 32,034 32,034 32,034 32,034 32,034 32,034 32,034 32,034 32,034 32,034
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,375 24,375 24,375 24,375 24,375 24,375 24,375 24,375 24,375 24,375
13.11 PERMA PLY 2 CAPAS M2 ### 28,656 28,656 28,656 28,656 28,656 28,656 28,656 28,656 28,656 28,656
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 50,136 55,698 49,063 51,600 52,576 49,648 51,112 49,746 50,234 54,430
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 58,742 65,540 57,430 60,531 61,723 58,145 59,934 58,265 58,861 63,990
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 85,119 95,626 83,091 87,884 89,727 84,197 86,962 84,381 85,303 93,229
13.15 TRITURADO FINO 1/2 M3 ### 110,691 155,842 101,978 122,573 130,494 106,730 118,612 107,522 111,484 145,545
13.16 TRITURADO GRUESO 3/4 M3 ### 109,225 158,129 104,082 128,903 131,009 111,554 125,262 111,009 107,884 147,709

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 60,319 60,874 60,212 60,465 60,563 60,270 60,417 60,280 60,329 60,748

14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 36,171 36,449 36,118 36,244 36,293 36,147 36,220 36,152 36,176 36,385

14.3 ADOQUÍN CONCRETO 6CM M2 ### 68,660 70,048 68,392 69,025 69,269 68,538 68,903 68,562 68,684 69,731
14.4 ADOQUÍN CONCRETO 8CM M2 ### 72,160 73,548 71,892 72,525 72,769 72,038 72,403 72,062 72,184 73,231
14.5 ADOQUÍN GRES PEATONAL M2 ### 76,670 78,058 76,402 77,035 77,279 76,548 76,913 76,572 76,694 77,741
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO M2 ### 79,383 79,938 79,276 79,529 79,627 79,334 79,480 79,344 79,393 79,812
14.7 GRAVILLA PARA GRADAS ML ### 39,781 40,479 39,647 39,965 40,087 39,720 39,904 39,732 39,794 40,320
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 172,152 174,651 171,670 172,809 173,248 171,933 172,590 171,977 172,196 174,081
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 49,364 51,037 49,041 49,804 50,098 49,217 49,658 49,247 49,394 50,656
14.10 GUARDAESCOBA EN GRANITO ML ### 46,737 46,737 46,737 46,737 46,737 46,737 46,737 46,737 46,737 46,737
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,843 11,541 10,708 11,027 11,149 10,782 10,965 10,794 10,855 11,382
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,891 9,891 9,891 9,891 9,891 9,891 9,891 9,891 9,891 9,891
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,264 13,264 13,264 13,264 13,264 13,264 13,264 13,264 13,264 13,264
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,180 11,180 11,180 11,180 11,180 11,180 11,180 11,180 11,180 11,180
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,636 18,636 18,636 18,636 18,636 18,636 18,636 18,636 18,636 18,636
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 36,180 36,180 36,180 36,180 36,180 36,180 36,180 36,180 36,180 36,180
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,879 9,879 9,879 9,879 9,879 9,879 9,879 9,879 9,879 9,879
14.18 LISTÓN M.H. AMARILLO M2 ### 78,883 78,883 78,883 78,883 78,883 78,883 78,883 78,883 78,883 78,883
14.19 PASO ESCALERA GRANITO ML ### 125,165 127,108 124,790 125,676 126,017 124,994 125,506 125,028 125,199 126,665
14.20 PIRLANES ALUMINIO ML ### 8,102 8,102 8,102 8,102 8,102 8,102 8,102 8,102 8,102 8,102
14.21 PIRLANES LADRILLO ML ### 34,539 35,357 34,381 34,754 34,898 34,467 34,682 34,481 34,553 35,170
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,494 48,494
14.23 PISO VINILO TRÁFICO PESADO M2 ### 56,292 56,292 56,292 56,292 56,292 56,292 56,292 56,292 56,292 56,292
14.24 PULIDA LACADA PISO MADERA M2 ### 52,261 52,261 52,261 52,261 52,261 52,261 52,261 52,261 52,261 52,261
14.25 TABLETA DE GRES 25X25 M2 ### 52,337 52,892 52,230 52,483 52,581 52,288 52,435 52,298 52,347 52,766
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,705 59,260 58,597 58,851 58,948 58,656 58,802 58,666 58,714 59,133
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,692 11,692 11,692 11,692 11,692 11,692 11,692 11,692 11,692 11,692
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 53,148 54,375 52,911 53,471 53,686 53,040 53,363 53,062 53,169 54,095
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
14.29 JABONERA PORCELANA ACUARIO UN ### p 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806 21,806
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
i
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### o 130,241 130,241 130,241 130,241 130,241 130,241 130,241 130,241 130,241 130,241
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,634 10,634 10,634 10,634 10,634 10,634 10,634 10,634 10,634 10,634
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,836 23,836 23,836 23,836 23,836 23,836 23,836 23,836 23,836 23,836
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,369 15,369 15,369 15,369 15,369 15,369 15,369 15,369 15,369 15,369
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,937 14,937 14,937 14,937 14,937 14,937 14,937 14,937 14,937 14,937
14.35 REMATES BOCEL ALUMINIO ML ### 9,157 9,157 9,157 9,157 9,157 9,157 9,157 9,157 9,157 9,157
14.36 REMATES BOCEL PORCELANA ML ### 9,314 9,314 9,314 9,314 9,314 9,314 9,314 9,314 9,314 9,314
14.37 TAPA REGISTRO 20X20 UN ### 20,227 20,227 20,227 20,227 20,227 20,227 20,227 20,227 20,227 20,227
14.38 TAPA REGISTRO 6X6 UN ### 18,452 18,452 18,452 18,452 18,452 18,452 18,452 18,452 18,452 18,452
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 ### 19,631 19,631 19,631 19,631 19,631 19,631 19,631 19,631 19,631 19,631

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL


14.40 FUNDIDO EN SITIO
M2 ### 22,694 22,694 22,694 22,694 22,694 22,694 22,694 22,694 22,694 22,694
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 68,784 69,339 68,677 68,930 69,028 68,735 68,882 68,745 68,794 69,213
14.42 MEDIA CAÑA EN GRANITO ML ### 81,630 81,630 81,630 81,630 81,630 81,630 81,630 81,630 81,630 81,630
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,653 36,653 36,653 36,653 36,653 36,653 36,653 36,653 36,653 36,653
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,090 14,090 14,090 14,090 14,090 14,090 14,090 14,090 14,090 14,090
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 107,004 107,004 107,004 107,004 107,004 107,004 107,004 107,004 107,004 107,004
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 129,712 129,712 129,712 129,712 129,712 129,712 129,712 129,712 129,712 129,712

15 CIELO RASO
15.1 APLIQUE YESO ML ### 76,724 76,724 76,724 76,724 76,724 76,724 76,724 76,724 76,724 76,724
15.2 ARMADURA MADERA Y MALLA M2 ### 38,418 38,418 38,418 38,418 38,418 38,418 38,418 38,418 38,418 38,418
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,840 58,840 58,840 58,840 58,840 58,840 58,840 58,840 58,840 58,840
15.4 CIELO RASO DURACUSTIC M2 ### 72,053 72,053 72,053 72,053 72,053 72,053 72,053 72,053 72,053 72,053
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,836 53,836 53,836 53,836 53,836 53,836 53,836 53,836 53,836 53,836
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,563 99,563 99,563 99,563 99,563 99,563 99,563 99,563 99,563 99,563
15.7 CORNISAS YESO ML ### 51,459 51,459 51,459 51,459 51,459 51,459 51,459 51,459 51,459 51,459
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 109,907 109,907 109,907 109,907 109,907 109,907 109,907 109,907 109,907 109,907
15.9 MALLA CON VENA M2 ### 14,369 14,369 14,369 14,369 14,369 14,369 14,369 14,369 14,369 14,369

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
16.2 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE


16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990

16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 77,956 130,684 86,744 121,896 102,563 102,563 120,139 97,290 69,168 121,896
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 113,915 160,120 104,999 126,075 134,180 109,862 122,021 110,672 114,726 149,583
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 191,697 272,704 211,188 190,097 270,946 228,764 263,916 205,915 237,552 272,704
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 66,621 119,349 75,409 110,561 91,227 91,227 108,803 85,955 66,621 110,561
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 163,930 240,498 178,982 157,890 238,740 196,558 231,710 173,709 205,346 240,498
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### p 188,131 269,138 207,622 186,531 267,380 225,198 260,350 202,349 233,986 269,138
i
o
17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 318,422 318,422 318,422 318,422 318,422 318,422 318,422 318,422 318,422 318,422

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE


17.2 GRIFERÍA) UN ### 936,307 936,307 936,307 936,307 936,307 936,307 936,307 936,307 936,307 936,307

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN ### 507,832 507,832 507,832 507,832 507,832 507,832 507,832 507,832 507,832 507,832

17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN ### 148,273 148,273 148,273 148,273 148,273 148,273 148,273 148,273 148,273 148,273

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE


17.5 GRIFERÍA)
UN ### 206,900 206,900 206,900 206,900 206,900 206,900 206,900 206,900 206,900 206,900

SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE


17.6 GRIFERÍA)
UN ### 192,240 192,240 192,240 192,240 192,240 192,240 192,240 192,240 192,240 192,240

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 421,650 421,650 421,650 421,650 421,650 421,650 421,650 421,650 421,650 421,650

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE


17.8 GRIFERÍA)
UN ### 1,076,567 1,076,567 1,076,567 1,076,567 1,076,567 1,076,567 1,076,567 1,076,567 1,076,567 1,076,567

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 306,647 306,647 306,647 306,647 306,647 306,647 306,647 306,647 306,647 306,647

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A


17.10 BAÑERA
UN ### 217,748 217,748 217,748 217,748 217,748 217,748 217,748 217,748 217,748 217,748
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 87,361 87,361 87,361 87,361 87,361 87,361 87,361 87,361 87,361 87,361

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO


17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA) UN ### 263,207 263,207 263,207 263,207 263,207 263,207 263,207 263,207 263,207 263,207

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO


17.13 INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 387,120 387,120 387,120 387,120 387,120 387,120 387,120 387,120 387,120 387,120

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,859 8,859 8,859 8,859 8,859 8,859 8,859 8,859 8,859 8,859
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,275 3,275 3,275 3,275 3,275 3,275 3,275 3,275 3,275 3,275
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,847 11,847 11,847 11,847 11,847 11,847 11,847 11,847 11,847 11,847
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,761 44,761 44,761 44,761 44,761 44,761 44,761 44,761 44,761 44,761
18.5 CARBURO SOBRE PAÑETES M2 ### 6,207 6,207 6,207 6,207 6,207 6,207 6,207 6,207 6,207 6,207
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 69,097 69,097 69,097 69,097 69,097 69,097 69,097 69,097 69,097 69,097
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,699 3,699 3,699 3,699 3,699 3,699 3,699 3,699 3,699 3,699
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,942 2,942 2,942 2,942 2,942 2,942 2,942 2,942 2,942 2,942
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,803 14,803 14,803 14,803 14,803 14,803 14,803 14,803 14,803 14,803
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,282 4,282 4,282 4,282 4,282 4,282 4,282 4,282 4,282 4,282
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,606 15,606 15,606 15,606 15,606 15,606 15,606 15,606 15,606 15,606
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,067 6,067 6,067 6,067 6,067 6,067 6,067 6,067 6,067 6,067
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,912 6,912 6,912 6,912 6,912 6,912 6,912 6,912 6,912 6,912
18.14 ESTUCO M2 ### 7,478 7,478 7,478 7,478 7,478 7,478 7,478 7,478 7,478 7,478
18.15 ESTUCO (LINEAL) ML ### 4,687 4,687 4,687 4,687 4,687 4,687 4,687 4,687 4,687 4,687
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,489 16,489 16,489 16,489 16,489 16,489 16,489 16,489 16,489 16,489
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,236 10,236 10,236 10,236 10,236 10,236 10,236 10,236 10,236 10,236
18.18 LACA PISOS MADERA M2 ### 24,244 24,244 24,244 24,244 24,244 24,244 24,244 24,244 24,244 24,244
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,857 2,857 2,857 2,857 2,857 2,857 2,857 2,857 2,857 2,857
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,868 12,868 12,868 12,868 12,868 12,868 12,868 12,868 12,868 12,868
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,475 3,475 3,475 3,475 3,475 3,475 3,475 3,475 3,475 3,475
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,370 13,370 13,370 13,370 13,370 13,370 13,370 13,370 13,370 13,370
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### p 7,525 7,525 7,525 7,525 7,525 7,525 7,525 7,525 7,525 7,525
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### i 4,738 4,738 4,738 4,738 4,738 4,738 4,738 4,738 4,738 4,738
o
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 23,070 23,070 23,070 23,070 23,070 23,070 23,070 23,070 23,070 23,070
18.26 PINTURA EPÓXICA M2 ### 13,488 13,488 13,488 13,488 13,488 13,488 13,488 13,488 13,488 13,488
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,344 8,344 8,344 8,344 8,344 8,344 8,344 8,344 8,344 8,344

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,368,800 6,368,800 6,368,800 6,368,800 6,368,800 6,368,800 6,368,800 6,368,800 6,368,800 6,368,800
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 11,252,710 11,252,710 11,252,710 11,252,710 11,252,710 11,252,710 11,252,710 11,252,710 11,252,710 11,252,710
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,944,987 2,944,987 2,944,987 2,944,987 2,944,987 2,944,987 2,944,987 2,944,987 2,944,987 2,944,987
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,624,082 9,624,082 9,624,082 9,624,082 9,624,082 9,624,082 9,624,082 9,624,082 9,624,082 9,624,082
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,011,972 9,011,972 9,011,972 9,011,972 9,011,972 9,011,972 9,011,972 9,011,972 9,011,972 9,011,972
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,857 2,857 2,857 2,857 2,857 2,857 2,857 2,857 2,857 2,857
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 904,533 904,533 904,533 904,533 904,533 904,533 904,533 904,533 904,533 904,533
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 90,282 90,282 90,282 90,282 90,282 90,282 90,282 90,282 90,282 90,282
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,635,863 1,636,498 1,635,741 1,636,030 1,636,142 1,635,807 1,635,975 1,635,819 1,635,874 1,636,354
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 711,316 726,274 708,430 715,252 717,877 710,004 713,940 710,266 711,579 722,863

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,739 30,739 30,739 30,739 30,739 30,739 30,739 30,739 30,739 30,739
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 45,712 45,712 45,712 45,712 45,712 45,712 45,712 45,712 45,712 45,712
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 56,693 56,693 56,693 56,693 56,693 56,693 56,693 56,693 56,693 56,693

20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML ### 18,480 18,480 18,480 18,480 18,480 18,480 18,480 18,480 18,480 18,480

20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML ### 22,403 22,403 22,403 22,403 22,403 22,403 22,403 22,403 22,403 22,403

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,548 30,548 30,548 30,548 30,548 30,548 30,548 30,548 30,548 30,548

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,219 27,219 27,219 27,219 27,219 27,219 27,219 27,219 27,219 27,219
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,714 28,714 28,714 28,714 28,714 28,714 28,714 28,714 28,714 28,714
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,923 35,923 35,923 35,923 35,923 35,923 35,923 35,923 35,923 35,923
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,583 18,583 18,583 18,583 18,583 18,583 18,583 18,583 18,583 18,583
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,342 24,342 24,342 24,342 24,342 24,342 24,342 24,342 24,342 24,342
20.12 VÁLVULA DE BOLA GAS 1" UN ### 37,407 37,407 37,407 37,407 37,407 37,407 37,407 37,407 37,407 37,407
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 286,145 286,145 286,145 286,145 286,145 286,145 286,145 286,145 286,145 286,145
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 329,323 329,323 329,323 329,323 329,323 329,323 329,323 329,323 329,323 329,323
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 343,488 343,488 343,488 343,488 343,488 343,488 343,488 343,488 343,488 343,488
20.16 ACOMETIDA GAS 1/2" ML ### 318,990 318,990 318,990 318,990 318,990 318,990 318,990 318,990 318,990 318,990

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 233,017 233,017 233,017 233,017 233,017 233,017 233,017 233,017 233,017 233,017
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 35,665 35,665 35,665 35,665 35,665 35,665 35,665 35,665 35,665 35,665
21.3 SIRENA DE 110 V UN ### 108,947 108,947 108,947 108,947 108,947 108,947 108,947 108,947 108,947 108,947
21.4 CÁMARA CCTV UN ### 277,953 277,953 277,953 277,953 277,953 277,953 277,953 277,953 277,953 277,953
21.5 PARLANTE-CIELO FALSO UN ### 54,912 54,912 54,912 54,912 54,912 54,912 54,912 54,912 54,912 54,912
21.6 AMPLIFICADOR 100W UN ### 603,136 603,136 603,136 603,136 603,136 603,136 603,136 603,136 603,136 603,136
21.7 AMPLIFICADOR 300W UN ### 1,492,650 1,492,650 1,492,650 1,492,650 1,492,650 1,492,650 1,492,650 1,492,650 1,492,650 1,492,650
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,772 47,772 47,772 47,772 47,772 47,772 47,772 47,772 47,772 47,772
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 232,905 232,905 232,905 232,905 232,905 232,905 232,905 232,905 232,905 232,905
21.10 TOMA PARA MICRÓFONO UN ### 46,538 46,538 46,538 46,538 46,538 46,538 46,538 46,538 46,538 46,538
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,964 3,964 3,964 3,964 3,964 3,964 3,964 3,964 3,964 3,964
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
21.12 SPLITERS UN ### p 6,638 6,638 6,638 6,638 6,638 6,638 6,638 6,638 6,638 6,638
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### i 19,796 19,796 19,796 19,796 19,796 19,796 19,796 19,796 19,796 19,796
o
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,894 25,894 25,894 25,894 25,894 25,894 25,894 25,894 25,894 25,894
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,619 33,619 33,619 33,619 33,619 33,619 33,619 33,619 33,619 33,619
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 129,142 129,142 129,142 129,142 129,142 129,142 129,142 129,142 129,142 129,142
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 33,700 33,700 33,700 33,700 33,700 33,700 33,700 33,700 33,700 33,700
21.18 BANDEJA PORTACABLES PARA RACK UN ### 110,054 110,054 110,054 110,054 110,054 110,054 110,054 110,054 110,054 110,054
21.19 RACK 2' X 24" UN ### 194,500 194,500 194,500 194,500 194,500 194,500 194,500 194,500 194,500 194,500
21.20 RACK 3' X 24" UN ### 304,490 304,490 304,490 304,490 304,490 304,490 304,490 304,490 304,490 304,490
21.21 RACK 5' X 24" UN ### 378,768 378,768 378,768 378,768 378,768 378,768 378,768 378,768 378,768 378,768
21.22 RACK 7' X 24" UN ### 413,576 413,576 413,576 413,576 413,576 413,576 413,576 413,576 413,576 413,576
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 607,308 607,308 607,308 607,308 607,308 607,308 607,308 607,308 607,308 607,308
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 358,231 358,231 358,231 358,231 358,231 358,231 358,231 358,231 358,231 358,231
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 109,472 109,472 109,472 109,472 109,472 109,472 109,472 109,472 109,472 109,472
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,556 14,556 14,556 14,556 14,556 14,556 14,556 14,556 14,556 14,556
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,732 29,732 29,732 29,732 29,732 29,732 29,732 29,732 29,732 29,732
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,283 5,283 5,283 5,283 5,283 5,283 5,283 5,283 5,283 5,283
21.29 CANALETA METÁLICA 4X6 CMS ML ### 37,285 37,285 37,285 37,285 37,285 37,285 37,285 37,285 37,285 37,285
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,944 38,944 38,944 38,944 38,944 38,944 38,944 38,944 38,944 38,944
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,773 39,773 39,773 39,773 39,773 39,773 39,773 39,773 39,773 39,773
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,958 25,958 25,958 25,958 25,958 25,958 25,958 25,958 25,958 25,958
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,686 28,686 28,686 28,686 28,686 28,686 28,686 28,686 28,686 28,686
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,833 29,833 29,833 29,833 29,833 29,833 29,833 29,833 29,833 29,833
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 49,987 49,987 49,987 49,987 49,987 49,987 49,987 49,987 49,987 49,987
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 645,601 645,601 645,601 645,601 645,601 645,601 645,601 645,601 645,601 645,601
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 332,094 332,094 332,094 332,094 332,094 332,094 332,094 332,094 332,094 332,094
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 93,769 93,769 93,769 93,769 93,769 93,769 93,769 93,769 93,769 93,769
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,942 1,942 1,942 1,942 1,942 1,942 1,942 1,942 1,942 1,942
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,957 8,957 8,957 8,957 8,957 8,957 8,957 8,957 8,957 8,957
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,327 13,327 13,327 13,327 13,327 13,327 13,327 13,327 13,327 13,327
21.42 CABLE TELEFÓNICO 40 PARES ML ### 22,216 22,216 22,216 22,216 22,216 22,216 22,216 22,216 22,216 22,216
21.43 CABLE TELEVISIÓN RG6 ML ### 4,128 4,128 4,128 4,128 4,128 4,128 4,128 4,128 4,128 4,128
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,768 23,768 23,768 23,768 23,768 23,768 23,768 23,768 23,768 23,768
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,499 34,499 34,499 34,499 34,499 34,499 34,499 34,499 34,499 34,499
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,517 20,517 20,517 20,517 20,517 20,517 20,517 20,517 20,517 20,517
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML ### 16,235 16,235 16,235 16,235 16,235 16,235 16,235 16,235 16,235 16,235
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 650,377 650,377 650,377 650,377 650,377 650,377 650,377 650,377 650,377 650,377
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
p URBANISMO
i
1 ACUEDUCTO o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 28,528 28,528 28,528 28,528 28,528 28,528 28,528 28,528 28,528 28,528
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 95,244 95,244 95,244 95,244 95,244 95,244 95,244 95,244 95,244 95,244
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 535,643 535,643 535,643 535,643 535,643 535,643 535,643 535,643 535,643 535,643
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,143,215 1,143,215 1,143,215 1,143,215 1,143,215 1,143,215 1,143,215 1,143,215 1,143,215 1,143,215
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 131,169 131,169 131,169 131,169 131,169 131,169 131,169 131,169 131,169 131,169
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 798,150 798,150 798,150 798,150 798,150 798,150 798,150 798,150 798,150 798,150
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,717,208 1,717,208 1,717,208 1,717,208 1,717,208 1,717,208 1,717,208 1,717,208 1,717,208 1,717,208
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,861 13,861 13,861 13,861 13,861 13,861 13,861 13,861 13,861 13,861
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 17,059 17,059 17,059 17,059 17,059 17,059 17,059 17,059 17,059 17,059
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,380 21,380 21,380 21,380 21,380 21,380 21,380 21,380 21,380 21,380
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 23,385 23,385 23,385 23,385 23,385 23,385 23,385 23,385 23,385 23,385
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 28,003 28,003 28,003 28,003 28,003 28,003 28,003 28,003 28,003 28,003
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 28,003 28,003 28,003 28,003 28,003 28,003 28,003 28,003 28,003 28,003
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 112,051 112,051 112,051 112,051 112,051 112,051 112,051 112,051 112,051 112,051
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 129,810 129,810 129,810 129,810 129,810 129,810 129,810 129,810 129,810 129,810
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 401,627 401,627 401,627 401,627 401,627 401,627 401,627 401,627 401,627 401,627
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 150,785 150,785 150,785 150,785 150,785 150,785 150,785 150,785 150,785 150,785
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 248,569 248,569 248,569 248,569 248,569 248,569 248,569 248,569 248,569 248,569
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,099,441 1,099,441 1,099,441 1,099,441 1,099,441 1,099,441 1,099,441 1,099,441 1,099,441 1,099,441
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,266,655 1,266,655 1,266,655 1,266,655 1,266,655 1,266,655 1,266,655 1,266,655 1,266,655 1,266,655
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,981 14,981 14,981 14,981 14,981 14,981 14,981 14,981 14,981 14,981
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,234 13,234 13,234 13,234 13,234 13,234 13,234 13,234 13,234 13,234
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 32,388 32,388 32,388 32,388 32,388 32,388 32,388 32,388 32,388 32,388
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 128,850 128,850 128,850 128,850 128,850 128,850 128,850 128,850 128,850 128,850
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 191,667 191,667 191,667 191,667 191,667 191,667 191,667 191,667 191,667 191,667
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 31,424 31,424 31,424 31,424 31,424 31,424 31,424 31,424 31,424 31,424
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 108,088 108,088 108,088 108,088 108,088 108,088 108,088 108,088 108,088 108,088
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 159,965 159,965 159,965 159,965 159,965 159,965 159,965 159,965 159,965 159,965
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 31,715 31,715 31,715 31,715 31,715 31,715 31,715 31,715 31,715 31,715
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 65,344 65,344 65,344 65,344 65,344 65,344 65,344 65,344 65,344 65,344
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 262,745 262,745 262,745 262,745 262,745 262,745 262,745 262,745 262,745 262,745
1.32 UNIÓN REPARACION PVC 4" UN ### 76,204 76,204 76,204 76,204 76,204 76,204 76,204 76,204 76,204 76,204
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 305,628 305,628 305,628 305,628 305,628 305,628 305,628 305,628 305,628 305,628
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 183,749 183,749 183,749 183,749 183,749 183,749 183,749 183,749 183,749 183,749
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 521,590 521,590 521,590 521,590 521,590 521,590 521,590 521,590 521,590 521,590
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,395,334 1,395,334 1,395,334 1,395,334 1,395,334 1,395,334 1,395,334 1,395,334 1,395,334 1,395,334
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,061,684 2,061,684 2,061,684 2,061,684 2,061,684 2,061,684 2,061,684 2,061,684 2,061,684 2,061,684

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,403 11,403 11,403 11,403 11,403 11,403 11,403 11,403 11,403 11,403
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 26,087 26,087 26,087 26,087 26,087 26,087 26,087 26,087 26,087 26,087
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 97,527 143,555 88,645 109,640 117,715 93,490 105,602 94,297 98,335 133,058
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 72,665 125,393 81,453 116,605 97,271 97,271 114,847 91,998 63,877 116,605
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 72,174 124,902 80,962 116,114 96,781 96,781 114,357 91,508 72,174 116,114
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 111,131 129,578 109,081 112,155 129,578 109,081 132,652 109,081 113,180 138,802
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 59,584 78,390 57,495 60,629 78,390 57,495 81,524 57,495 61,674 87,792
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 122,222 175,409 111,957 136,218 145,549 117,556 131,552 118,488 123,154 163,278

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 119,772 119,772 119,772 119,772 119,772 119,772 119,772 119,772 119,772 119,772
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### p 1,247,682 1,247,682 1,247,682 1,247,682 1,247,682 1,247,682 1,247,682 1,247,682 1,247,682 1,247,682
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### i 156,487 156,487 156,487 156,487 156,487 156,487 156,487 156,487 156,487 156,487
o
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,445,108 1,445,108 1,445,108 1,445,108 1,445,108 1,445,108 1,445,108 1,445,108 1,445,108 1,445,108
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,007,315 1,007,315 1,007,315 1,007,315 1,007,315 1,007,315 1,007,315 1,007,315 1,007,315 1,007,315
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,453 63,453 63,453 63,453 63,453 63,453 63,453 63,453 63,453 63,453
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 118,897 118,897 118,897 118,897 118,897 118,897 118,897 118,897 118,897 118,897
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 280,625 280,625 280,625 280,625 280,625 280,625 280,625 280,625 280,625 280,625
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 450,479 450,479 450,479 450,479 450,479 450,479 450,479 450,479 450,479 450,479
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 118,947 118,947 118,947 118,947 118,947 118,947 118,947 118,947 118,947 118,947
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 118,947 118,947 118,947 118,947 118,947 118,947 118,947 118,947 118,947 118,947
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631 280,631
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 450,479 450,479 450,479 450,479 450,479 450,479 450,479 450,479 450,479 450,479
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 452,444 452,444 452,444 452,444 452,444 452,444 452,444 452,444 452,444 452,444
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 734,465 734,465 734,465 734,465 734,465 734,465 734,465 734,465 734,465 734,465
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,178,762 1,178,762 1,178,762 1,178,762 1,178,762 1,178,762 1,178,762 1,178,762 1,178,762 1,178,762
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 72,942 72,942 72,942 72,942 72,942 72,942 72,942 72,942 72,942 72,942
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 378,653 378,653 378,653 378,653 378,653 378,653 378,653 378,653 378,653 378,653
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 424,604 424,604 424,604 424,604 424,604 424,604 424,604 424,604 424,604 424,604
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,174,404 1,174,404 1,174,404 1,174,404 1,174,404 1,174,404 1,174,404 1,174,404 1,174,404 1,174,404
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 69,068 69,617 68,963 69,213 69,309 69,020 69,164 69,030 69,078 69,492
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 343,291 343,291 343,291 343,291 343,291 343,291 343,291 343,291 343,291 343,291
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 52,314 52,314 52,314 52,314 52,314 52,314 52,314 52,314 52,314 52,314
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 73,941 73,941 73,941 73,941 73,941 73,941 73,941 73,941 73,941 73,941
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 106,653 106,653 106,653 106,653 106,653 106,653 106,653 106,653 106,653 106,653
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 163,689 163,689 163,689 163,689 163,689 163,689 163,689 163,689 163,689 163,689
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 262,975 262,975 262,975 262,975 262,975 262,975 262,975 262,975 262,975 262,975
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 381,530 381,530 381,530 381,530 381,530 381,530 381,530 381,530 381,530 381,530
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 482,803 482,803 482,803 482,803 482,803 482,803 482,803 482,803 482,803 482,803
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 634,813 634,813 634,813 634,813 634,813 634,813 634,813 634,813 634,813 634,813
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 873,078 873,078 873,078 873,078 873,078 873,078 873,078 873,078 873,078 873,078

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO) UN ### 705,593 741,492 698,665 715,040 721,338 702,444 711,891 703,074 706,223 733,305

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.


4.2 PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML ### 673,507 691,192 670,094 678,161 681,263 671,956 676,609 672,266 673,817 687,158

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO


4.3 (INCLUYE ARO Y TAPA HF) UN ### 749,265 773,197 744,647 755,563 759,762 747,165 753,464 747,585 749,685 767,739

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON


4.4 REFUERZO)
UN ### 837,673 882,546 829,013 849,482 857,354 833,736 845,546 834,524 838,460 872,312

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.


4.5 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 955,153 980,057 950,347 961,707 966,076 952,969 959,522 953,406 955,590 974,377

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON


4.6 REFUERZO (INCLUYE ARO Y TAPA HF)
UN ### 865,227 898,135 858,877 873,887 879,661 862,341 871,001 862,918 865,805 890,630
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,048,419 1,064,905 1,045,240 1,052,759 1,055,649 1,046,974 1,051,310 1,047,262 1,048,707 1,061,146
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,521,300 1,570,392 1,511,831 1,534,221 1,542,831 1,516,995 1,529,909 1,517,855 1,522,160 1,559,198
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,081,224 2,176,738 2,062,792 2,106,360 2,123,117 2,072,846 2,097,981 2,074,521 2,082,900 2,154,956
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,764,910 2,923,681 2,734,271 2,806,693 2,834,548 2,750,983 2,792,764 2,753,768 2,767,696 2,887,474
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,916,518 1,916,518 1,916,518 1,916,518 1,916,518 1,916,518 1,916,518 1,916,518 1,916,518 1,916,518
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,049,493 4,049,493 4,049,493 4,049,493 4,049,493 4,049,493 4,049,493 4,049,493 4,049,493 4,049,493
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 145,359 146,081 145,220 145,549 145,676 145,296 145,486 145,309 145,372 145,917
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
p
5 ANDENES Y SARDINELES i
o
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 78,055 80,918 77,502 78,808 79,311 77,803 78,557 77,853 78,105 80,265
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 92,095 94,958 91,542 92,848 93,351 91,843 92,597 91,893 92,145 94,305
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 59,460 65,949 58,207 61,168 62,306 58,891 60,598 59,004 59,574 64,469
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 64,181 70,463 62,968 65,834 66,936 63,629 65,283 63,740 64,291 69,030
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 64,398 70,511 63,218 66,007 67,079 63,862 65,470 63,969 64,505 69,117
5.6 BORDE SEPARADOR VERDE A-170 ML ### 264,233 264,955 264,094 264,423 264,550 264,170 264,360 264,183 264,246 264,791
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,539 20,318 19,389 19,744 19,881 19,471 19,676 19,485 19,553 20,140
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 42,569 47,142 41,686 43,772 44,575 42,168 43,371 42,248 42,649 46,099
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 87,093 87,479 87,019 87,195 87,262 87,059 87,161 87,066 87,100 87,391
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 580,721 591,963 578,552 583,680 585,652 579,736 582,694 579,933 580,919 589,399
5.11 LOSETA PREFABRICADA A-40 M2 ### 64,761 66,413 64,442 65,196 65,486 64,616 65,051 64,645 64,790 66,036
5.12 LOSETA PREFABRICADA A-60 M2 ### 93,978 95,630 93,659 94,413 94,702 93,833 94,268 93,862 94,007 95,253
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 35,318 37,831 34,833 35,980 36,420 35,098 35,759 35,142 35,362 37,258

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 56,844 61,930 55,863 58,183 59,075 56,398 57,736 56,487 56,933 60,770
5.15 SARDINEL PREFABRICADO A-10 ML ### 107,666 118,016 110,590 108,378 117,600 112,621 116,703 110,041 113,657 117,928
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 62,602 63,602 62,410 62,865 63,041 62,515 62,778 62,532 62,620 63,374

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 212,273 215,264 211,695 213,060 213,585 212,010 212,797 212,063 212,325 214,582
6.2 BANCA EN CONCRETO M-30 UN ### 695,091 699,279 694,283 696,193 696,928 694,724 695,826 694,797 695,164 698,324
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 224,357 224,986 224,235 224,522 224,633 224,302 224,467 224,313 224,368 224,842
6.4 BOLARDO M-60 CONCRETO UN ### 169,775 173,365 169,082 170,720 171,350 169,460 170,405 169,523 169,838 172,546
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 171,755 175,345 171,062 172,700 173,329 171,440 172,385 171,503 171,818 174,526
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 201,128 204,902 200,399 202,121 202,783 200,797 201,790 200,863 201,194 204,041
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 62,721 64,914 62,298 63,298 63,683 62,529 63,106 62,567 62,759 64,414
6.8 BORDILLO PREFABRICADO A-80 ML ### 72,050 74,505 71,576 72,696 73,127 71,835 72,480 71,878 72,093 73,945
6.9 CANECA M-120 UN ### 325,065 325,613 324,959 325,209 325,305 325,017 325,161 325,026 325,075 325,488
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 857,119 858,913 856,772 857,591 857,906 856,961 857,433 856,993 857,150 858,504
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,511,661 3,512,858 3,511,430 3,511,976 3,512,186 3,511,556 3,511,871 3,511,577 3,511,682 3,512,585
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,612,440 3,613,637 3,612,209 3,612,755 3,612,965 3,612,335 3,612,650 3,612,356 3,612,461 3,613,364
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 505,446 506,704 505,203 505,777 505,998 505,335 505,666 505,358 505,468 506,417
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 670,032 675,064 669,061 671,356 672,239 669,591 670,915 669,679 670,120 673,917
6.15 BANCA EN MADERA M-50 UN ### 556,259 556,259 556,259 556,259 556,259 556,259 556,259 556,259 556,259 556,259
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 259,007 260,802 258,661 259,480 259,795 258,850 259,322 258,881 259,039 260,393
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 599,050 600,421 598,786 599,411 599,652 598,930 599,291 598,954 599,075 600,108
6.18 POSTE HISTÓRICO M-131 UN ### 6,674,638 6,683,613 6,672,906 6,677,000 6,678,574 6,673,851 6,676,213 6,674,008 6,674,796 6,681,566

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,193 4,193 4,193 4,193 4,193 4,193 4,193 4,193 4,193 4,193
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,113 45,113 45,113 45,113 45,113 45,113 45,113 45,113 45,113 45,113
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 326,258 326,619 326,188 326,353 326,416 326,226 326,321 326,232 326,264 326,536
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 514,016 516,532 513,530 514,678 515,119 513,795 514,457 513,839 514,060 515,958
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 244,025 244,386 243,956 244,120 244,184 243,994 244,089 244,000 244,032 244,304
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 259,145 259,506 259,076 259,240 259,304 259,114 259,209 259,120 259,152 259,424
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 270,595 270,956 270,526 270,690 270,754 270,564 270,659 270,570 270,602 270,874
7.8 TACHAS REFLECTIVAS UN ### 14,085 14,085 14,085 14,085 14,085 14,085 14,085 14,085 14,085 14,085
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 15,039 15,039 15,039 15,039 15,039 15,039 15,039 15,039 15,039 15,039
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN)
UN ### 122,467 122,467 122,467 122,467 122,467 122,467 122,467 122,467 122,467 122,467
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
p
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE


1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE


1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y


1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM) HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE


1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,


1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES
M3-KM### 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS
M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,226 36,226 36,226 36,226 36,226 36,226 36,226 36,226 36,226 36,226

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y


2.3 210.2.2 PRÉSTAMOS
M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002
2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 EXISTENTE M2 ### 494 494 494 494 494 494 494 494 494 494

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE


2.8 230.2 MATERIAL ADICIONADO M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE


2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 66,699 66,699 66,699 66,699 66,699 66,699 66,699 66,699 66,699 66,699

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE


2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 81,866 81,866 81,866 81,866 81,866 81,866 81,866 81,866 81,866 81,866

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO


2.12 600.4 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE


2.13 600.4 P RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE


2.14 600.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO


2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 163,930 240,498 178,982 157,890 238,740 196,558 231,710 173,709 205,346 240,498
3.3 330.1 BASE GRANULAR M3 ### 188,131 269,138 207,622 186,531 267,380 225,198 260,350 202,349 233,986 269,138
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,338 3,338 3,338 3,338 3,338 3,338 3,338 3,338 3,338 3,338
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,159 1,159 1,159 1,159 1,159 1,159 1,159 1,159 1,159 1,159
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION p
3.7 461.1 ASFÁLTICA
M3 ### i 234,707 247,200 232,296 237,995 240,186 233,611 236,899 233,830 234,926 244,351
o
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 68,174 70,885 67,651 68,888 69,363 67,936 68,650 67,984 68,222 70,267
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO) M3 ### 664,237 691,277 665,927 606,777 642,267 681,137 657,477 677,757 637,197 667,617

MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO


3.10 450.2 P ASFÁLTICO)
M3 ### 670,378 697,418 672,068 612,918 648,408 687,278 663,618 683,898 643,338 673,758

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO


3.11 450.9 P ASFÁLTICO)
M3 ### 709,418 736,458 711,108 651,958 687,448 726,318 702,658 722,938 682,378 712,798

MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO


3.12 450.3 P ASFÁLTICO)
M3 ### 701,083 728,123 702,773 643,623 679,113 717,983 694,323 714,603 674,043 704,463

3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### 425,468 457,475 416,240 410,349 411,412 428,870 422,599 427,207 430,687 436,826
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 341,621 422,628 361,112 340,021 420,871 378,688 413,840 355,839 387,476 422,628
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 316,214 392,781 331,265 310,174 391,024 348,841 383,993 325,992 357,629 392,781
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 39,912 39,912 39,912 39,912 39,912 39,912 39,912 39,912 39,912 39,912

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 177,203 177,203 177,203 177,203 177,203 177,203 177,203 177,203 177,203 177,203
3.15 311.1 AFIRMADO M3 ### 66,621 119,349 75,409 110,561 91,227 91,227 108,803 85,955 66,621 110,561
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,231 13,108 12,062 12,462 12,616 12,154 12,385 12,169 12,246 12,908
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,938 5,376 4,853 5,053 5,130 4,899 5,015 4,907 4,945 5,276
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 670,356 727,869 659,257 685,491 695,581 665,311 680,446 666,320 671,366 714,753

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE


3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 703,968 764,056 692,373 719,781 730,323 698,697 714,510 699,751 705,023 750,353

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE


3.20 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 726,395 788,218 714,465 742,665 753,511 720,972 737,242 722,057 727,480 774,119

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE


3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
ML ### 7,404 7,404 7,404 7,404 7,404 7,404 7,404 7,404 7,404 7,404
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 89,683 116,453 86,709 91,171 116,453 86,709 120,915 86,709 92,658 129,838

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 959,029 1,024,267 946,440 976,197 987,643 953,306 970,475 954,451 960,174 1,009,390
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 825,799 889,957 813,419 842,684 853,939 820,172 837,056 821,298 826,927 875,326
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 874,820 941,518 861,949 892,372 904,074 868,969 886,522 870,140 875,991 926,307
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 598,753 657,560 587,404 614,229 624,546 593,595 609,070 594,626 599,785 644,149
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 700,016 761,152 688,218 716,105 726,831 694,654 710,742 695,726 701,089 747,210
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 596,664 657,093 585,003 612,567 623,169 591,363 607,266 592,423 597,725 643,312
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 697,845 760,667 685,721 714,377 725,399 692,333 708,866 693,436 698,947 746,340
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 762,235 822,664 750,574 778,138 788,739 756,934 772,837 757,994 763,296 808,883
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 617,050 679,872 604,926 633,582 644,604 611,538 628,071 612,641 618,152 665,545
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 808,738 871,560 796,615 825,270 836,292 803,226 819,760 804,329 809,840 857,233
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P ACERO A-36
KG ### 12,407 12,407 12,407 12,407 12,407 12,407 12,407 12,407 12,407 12,407

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE


4.12 650 P ACERO A-588 GRADO B
KG ### 15,888 15,888 15,888 15,888 15,888 15,888 15,888 15,888 15,888 15,888
4.13 641.1 ACERO DE PREESFUERZO TON-M### 1,866 1,866 1,866 1,866 1,866 1,866 1,866 1,866 1,866 1,866
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,782,916 2,782,916 2,782,916 2,782,916 2,782,916 2,782,916 2,782,916 2,782,916 2,782,916 2,782,916

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN


4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML ### 4,312,304 4,423,896 4,290,769 4,341,671 4,361,249 4,302,515 4,331,882 4,304,473 4,314,263 4,398,447
REFUERZO Y ANILLOS)

BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE


4.16 621.2 REFUERZO)
M3 ### 1,789,576 1,849,407 1,778,030 1,805,321 1,815,818 1,784,327 1,800,073 1,785,377 1,790,626 1,835,762
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ### p 90,763
U(DM3) 90,763 90,763 90,763 90,763 90,763 90,763 90,763 90,763 90,763
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### i 375,541 382,721 374,155 377,430 378,690 374,911 376,800 375,037 375,667 381,083
o
4.19 632 P BARANDA METÁLICA ML ### 440,773 440,773 440,773 440,773 440,773 440,773 440,773 440,773 440,773 440,773
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648 17,648
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 503,378 599,485 496,501 547,171 546,441 512,937 540,505 510,808 504,495 579,559
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 129,383 156,153 126,409 130,870 156,153 126,409 160,614 126,409 132,358 169,538
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 77,863 126,535 85,975 118,423 100,576 100,576 116,800 95,709 69,751 118,423
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 402,339 465,868 390,080 419,058 430,203 396,766 413,485 397,881 403,454 451,381
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 380,645 428,120 372,281 391,118 406,933 376,253 398,623 376,915 382,389 424,381

CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA


4.26 630.7 ELEVACIONES
M3 ### 389,316 436,791 380,952 399,789 415,604 384,924 407,294 385,586 391,060 433,052
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 395,465 442,282 387,227 405,765 421,464 391,131 413,327 391,781 397,197 438,692
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 404,136 450,953 395,898 414,436 430,135 399,802 421,998 400,452 405,868 447,363
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 545,369 607,792 533,323 561,797 572,748 539,894 556,321 540,989 546,465 593,556
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 644,751 709,646 632,228 661,829 673,215 639,059 656,136 640,197 645,890 694,847
4.31 681.1 GAVIÓN M3 ### 182,217 207,770 179,378 183,637 207,770 179,378 212,029 179,378 185,056 220,546
4.32 681.1 GAVIÓN MALLA PVC M3 ### 186,533 212,086 183,694 187,953 212,086 183,694 216,345 183,694 189,372 224,862
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4.33 672.1 2500 PSI
ML ### 44,667 48,499 43,928 45,676 46,348 44,331 45,339 44,398 44,734 47,625

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,


4.34 672.1 2500 PSI ML ### 17,202 19,118 16,832 17,706 18,042 17,034 17,538 17,067 17,235 18,681

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO


4.35 *** (RESISTENCIA ÚLTIMA 25 KN) M2 ### 10,543 10,543 10,543 10,543 10,543 10,543 10,543 10,543 10,543 10,543

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,998 14,998 14,998 14,998 14,998 14,998 14,998 14,998 14,998 14,998

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 20,158 20,158 20,158 20,158 20,158 20,158 20,158 20,158 20,158 20,158

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.38 *** (RESISTENCIA ÚLTIMA 100 KN)
M2 ### 24,149 24,149 24,149 24,149 24,149 24,149 24,149 24,149 24,149 24,149

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO


4.39 *** (RESISTENCIA ÚLTIMA 165 KN) M2 ### 31,009 31,009 31,009 31,009 31,009 31,009 31,009 31,009 31,009 31,009

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800


4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 7,566 7,566 7,566 7,566 7,566 7,566 7,566 7,566 7,566 7,566

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,615 8,615 8,615 8,615 8,615 8,615 8,615 8,615 8,615 8,615

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 8,951 8,951 8,951 8,951 8,951 8,951 8,951 8,951 8,951 8,951

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,


4.43 *** FILTRO Y SEPARACIÓN)
M2 ### 6,394 6,394 6,394 6,394 6,394 6,394 6,394 6,394 6,394 6,394

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,


4.44 *** FILTRO Y SEPARACIÓN) M2 ### 9,600 9,600 9,600 9,600 9,600 9,600 9,600 9,600 9,600 9,600

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,


4.45 *** FILTRO Y SEPARACIÓN)
M2 ### 7,839 7,839 7,839 7,839 7,839 7,839 7,839 7,839 7,839 7,839

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN,


4.46 *** FILTRO Y SEPARACIÓN) M2 ### 9,600 9,600 9,600 9,600 9,600 9,600 9,600 9,600 9,600 9,600

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000


4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 18,393 18,393 18,393 18,393 18,393 18,393 18,393 18,393 18,393 18,393

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO


4.48 661.1 Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### 655,233 656,118 655,062 655,466 655,621 655,155 655,388 655,171 655,248 655,916
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
4.49 660.3 DIÁMETRO 600 MM
ML ### 375,864 389,166 373,297 379,365 381,698 374,697 378,198 374,931 376,097 386,132
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,
4.50 *** DIÁMETRO 36"
ML ### 916,028 916,028 916,028 916,028 916,028 916,028 916,028 916,028 916,028 916,028
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 138,106 188,806 146,556 180,356 161,766 161,766 178,666 156,696 138,106 180,356
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M PROVINCIA: SUMAPAZ
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
ÍTEM DESCRIPCIÓN UNIDAD c Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia
i
p
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG ### i 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605 4,605
o
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4.53 *** INSTALACIÓN) ML ### 89,123 89,123 89,123 89,123 89,123 89,123 89,123 89,123 89,123 89,123

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E


4.54 *** INSTALACIÓN)
ML ### 135,772 135,772 135,772 135,772 135,772 135,772 135,772 135,772 135,772 135,772
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 552,590 617,485 540,067 569,668 581,053 546,898 563,975 548,036 553,729 602,685
4.56 682.1 P COLCHONETA RENO M3 ### 198,989 224,541 196,149 200,408 224,541 196,149 228,800 196,149 201,828 237,318
4.57 *** TRINCHO EN MADERA M2 ### 70,569 70,569 70,569 70,569 70,569 70,569 70,569 70,569 70,569 70,569

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,194 4,194 4,194 4,194 4,194 4,194 4,194 4,194 4,194 4,194
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,113 45,113 45,113 45,113 45,113 45,113 45,113 45,113 45,113 45,113
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 86,952 86,952 86,952 86,952 86,952 86,952 86,952 86,952 86,952 86,952
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 72,361 72,361 72,361 72,361 72,361 72,361 72,361 72,361 72,361 72,361
5.5 730.1 DEFENSA METÁLICA ML ### 154,129 157,197 153,537 154,936 155,475 153,860 154,667 153,913 154,183 156,497
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES
UN ### 14,085 14,085 14,085 14,085 14,085 14,085 14,085 14,085 14,085 14,085

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 866 866 866 866 866 866 866 866 866 866
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
6.2 801.6 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847
UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE


6.3 801.7 DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067

6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE


6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM)
M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,587 15,587 15,587 15,587 15,587 15,587 15,587 15,587 15,587 15,587
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 25,234 25,234 25,234 25,234 25,234 25,234 25,234 25,234 25,234 25,234
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,551 9,551 9,551 9,551 9,551 9,551 9,551 9,551 9,551 9,551

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
p CONSTRUCCIÓN
i
1 PRELIMINARES o
1.1 CAMPAMENTO 18 M2 UN ### 2,100,080 2,109,777 2,079,877 2,107,353 2,116,242 2,086,899 2,107,353 2,097,655 2,086,341 2,113,212
1.2 CAMPAMENTO 9 M2 UN ### 1,224,819 1,229,668 1,214,718 1,228,456 1,232,900 1,218,229 1,228,456 1,223,607 1,217,950 1,231,385
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,783 14,783 14,783 14,783 14,783 14,783 14,783 14,783 14,783 14,783
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,570 16,570 16,570 16,570 16,570 16,570 16,570 16,570 16,570 16,570
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,174 19,174 19,174 19,174 19,174 19,174 19,174 19,174 19,174 19,174
1.6 CERCA EN TABLA H=2.30 M ML ### 67,960 67,960 67,960 67,960 67,960 67,960 67,960 67,960 67,960 67,960
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 47,955 48,046 47,767 48,023 48,106 47,865 48,023 47,933 47,827 48,083
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,397 22,487 22,208 22,465 22,548 22,307 22,465 22,374 22,269 22,524
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 936,502 937,905 933,124 936,982 939,006 936,595 937,621 937,114 936,157 937,856

LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE


1.41 PRESICIÓN
M2 ### 10,682 10,682 10,682 10,682 10,682 10,682 10,682 10,682 10,682 10,682

1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,886 3,886 3,886 3,886 3,886 3,886 3,886 3,886 3,886 3,886
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,774,263 2,774,263 2,774,263 2,774,263 2,774,263 2,774,263 2,774,263 2,774,263 2,774,263 2,774,263
1.44 RED TELEFÓNICA PROVISIONAL UN ### 257,461 257,461 257,461 257,461 257,461 257,461 257,461 257,461 257,461 257,461
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE) M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 118,393 127,181 92,029 114,878 135,969 135,969 144,757 134,211 118,393 111,466
2.2 BASE ARENA CEMENTO 1:20 M3 ### 192,115 192,115 192,115 192,115 192,115 180,682 192,115 192,115 192,115 195,729
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### p 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### i 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
o
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### 22,928 22,928 22,928 22,928 22,928 22,928 22,928 22,928 22,928 22,928
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### 683,257 692,579 663,835 690,248 698,794 672,836 690,248 680,926 670,050 696,205
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 682,884 691,892 664,118 689,640 697,897 674,417 689,640 680,632 670,123 695,627
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 636,516 644,950 618,944 642,842 650,573 628,588 642,842 634,407 624,567 648,447
2.9 PILOTE DE MADERA D=20 CM ML ### 51,078 51,078 51,078 51,078 51,078 51,078 51,078 51,078 51,078 51,078
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 UNA DISTANCIA MENOR DE 5 KM) ML ### 157,735 157,735 157,735 157,735 157,735 157,735 157,735 157,735 157,735 157,735

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A


2.11 UNA DISTANCIA MENOR DE 5 KM)
ML ### 196,758 196,758 196,758 196,758 196,758 196,758 196,758 196,758 196,758 196,758

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A


2.12 UNA DISTANCIA MENOR DE 5 KM)
ML ### 243,948 243,948 243,948 243,948 243,948 243,948 243,948 243,948 243,948 243,948

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A


2.13 UNA DISTANCIA MENOR DE 5 KM)
ML ### 307,473 307,473 307,473 307,473 307,473 307,473 307,473 307,473 307,473 307,473
2.14 PILOTE HINCADO 25X25 ML ### 108,897 109,448 107,751 109,310 109,814 108,548 109,310 108,760 108,118 109,700
2.15 PILOTE HINCADO 30X30 ML ### 134,533 135,330 132,872 135,131 135,862 134,027 135,131 134,333 133,403 135,696
2.16 DADOS EN CONCRETO 3500PSI M3 ### 621,517 629,952 603,946 627,844 635,575 613,589 627,844 619,409 609,568 633,449
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM)
ML ### 94,511 94,511 94,511 94,511 94,511 94,511 94,511 94,511 94,511 94,511

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 39,804 39,804 39,804 39,804 39,804 39,733 39,804 39,804 39,804 39,826
3.2 SIFÓN EN PVC 6" UN ### 204,417 204,417 204,417 204,417 204,417 204,346 204,417 204,417 204,417 204,440
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 491,045 498,083 472,596 491,575 504,152 493,176 496,876 497,270 494,702 496,027
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 238,953 240,487 235,439 239,703 241,625 237,241 240,150 239,243 237,930 240,649
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 273,071 275,342 267,838 274,145 277,039 270,488 274,848 273,562 271,660 275,630
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 359,025 362,482 351,322 360,988 364,968 353,882 361,691 359,219 355,935 363,290
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 110,198 110,248 110,049 110,178 110,297 110,297 110,242 110,282 110,292 110,206
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,325,488 1,325,985 1,323,995 1,325,289 1,326,483 1,326,483 1,325,927 1,326,325 1,326,425 1,325,569
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 119,250 119,250 119,250 119,250 119,250 118,465 119,250 119,250 119,250 119,498
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 75,064 75,064 75,064 75,064 75,064 74,650 75,064 75,064 75,064 75,195
3.11 TUBERÍA DRENAJE PVC 110 ML ### 29,967 30,236 29,406 30,169 30,416 29,406 30,169 29,899 29,585 30,304
3.12 TUBERÍA DRENAJE PVC 160 ML ### 47,510 47,779 46,948 47,712 47,959 46,948 47,712 47,442 47,128 47,846
3.13 TUBERÍA DRENAJE PVC 200 ML ### 62,361 62,738 61,575 62,644 62,989 61,575 62,644 62,267 61,827 62,832
3.14 TUBERÍA DRENAJE PVC 250 ML ### 84,915 85,346 84,017 85,238 85,633 84,017 85,238 84,807 84,304 85,454
3.15 TUBERÍA DRENAJE PVC 315 ML ### 116,525 116,902 115,739 116,808 117,153 115,739 116,808 116,431 115,991 116,996
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3.16 MATERIAL FILTRANTE)
UN ### 1,003,834 1,008,144 994,855 1,007,067 1,011,018 994,855 1,007,067 1,002,757 997,728 1,009,222
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3.17 MATERIAL FILTRANTE)
UN ### 1,426,812 1,435,432 1,408,853 1,433,277 1,441,178 1,408,853 1,433,277 1,424,657 1,414,600 1,437,587
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3.18 MATERIAL FILTRANTE)
UN ### 1,879,150 1,896,390 1,843,233 1,892,079 1,907,882 1,843,233 1,892,079 1,874,839 1,854,726 1,900,700

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 43,774 43,774 43,774 43,774 43,774 43,774 43,774 43,774 43,774 43,774
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 57,683 57,683 57,683 57,683 57,683 57,683 57,683 57,683 57,683 57,683
4.3 COLUMNAS 3500 PSI M3 ### 851,709 860,144 834,138 858,036 865,767 843,781 858,036 849,601 839,760 863,641
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 268,732 292,425 255,937 290,890 289,415 271,066 285,875 277,226 266,299 282,198
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4.5 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2 ### 103,167 103,986 101,461 103,781 104,532 102,397 103,781 102,962 102,007 104,325

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.


4.6 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2 ### 121,597 122,579 119,549 122,334 123,234 120,673 122,334 121,351 120,205 122,987
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN
4.7 REFUERZO)
M2 ### 136,758 138,068 134,028 137,740 138,941 135,526 137,740 136,430 134,902 138,611
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 ### p 144,294 145,686 141,394 145,338 146,614 142,985 145,338 143,946 142,322 146,263
i
o
4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 ### 165,380 167,099 161,797 166,670 168,246 163,763 166,670 164,950 162,944 167,812

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 ### 183,970 185,935 179,875 185,444 187,245 182,122 185,444 183,478 181,185 186,750
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN
4.11 REFUERZO)
M2 ### 204,224 206,435 199,618 205,882 207,909 202,146 205,882 203,671 201,091 207,351
4.12 ENTREPISO VIGUETA PLACA M2 ### 103,263 103,353 103,074 103,331 103,414 103,111 103,331 103,240 103,135 103,411
4.13 ESCALERA MACIZA 3500 PSI M3 ### 1,005,512 1,013,946 987,940 1,011,838 1,019,569 997,584 1,011,838 1,003,403 993,563 1,017,443
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 98,224 98,224 98,224 98,224 98,224 98,536 98,224 98,224 98,224 98,269
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 83,502 84,345 81,744 84,134 84,907 82,709 84,134 83,291 82,307 84,695
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 94,018 95,049 91,868 94,791 95,737 93,048 94,791 93,760 92,556 95,477
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 109,619 110,913 106,924 110,590 111,776 108,403 110,590 109,296 107,786 111,450
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 747,624 756,059 730,052 753,950 761,681 739,696 753,950 745,516 735,675 759,555
4.19000000000001 PASOS
M)
PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
UN ### 51,997 52,229 51,512 52,171 52,384 51,849 52,171 51,938 51,667 52,336
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 297,179 300,946 289,331 300,004 303,457 293,638 300,004 296,237 291,842 302,508
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,334
4.22 ACERO FIGURADO 60000 PSI KG ### 4,546 4,546 4,546 4,546 4,546 4,546 4,546 4,546 4,546 4,546
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,425 6,425 6,425 6,425 6,425 6,425 6,425 6,425 6,425 6,425
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 902,797 911,231 885,225 909,123 916,854 894,869 909,123 900,688 890,848 914,728
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 823,179 832,428 803,910 830,116 838,594 814,438 830,116 820,866 810,075 836,256
4.26 VIGA AÉREA 3500 PSI M3 ### 893,698 902,133 876,126 900,025 907,756 885,770 900,025 891,590 881,749 905,630
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 872,400 880,835 854,828 878,726 886,457 864,472 878,726 870,292 860,451 884,332
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,095,209 1,103,643 1,077,637 1,101,535 1,109,266 1,087,281 1,101,535 1,093,100 1,083,260 1,107,140
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 356,458 367,556 333,336 364,781 374,954 341,373 364,781 353,683 340,735 371,486

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 31,266 31,421 30,943 31,382 31,525 31,096 31,382 31,227 31,046 31,515
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 52,834 52,989 52,510 52,950 53,092 52,664 52,950 52,795 52,614 53,082
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 36,696 36,696 36,696 36,696 36,696 36,625 36,696 36,696 36,696 36,719
5.4 ARCOS EN LADRILLO PRENSADO ML ### 171,893 171,893 171,893 171,893 171,893 171,751 171,893 171,893 171,893 171,937
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 46,494 46,727 46,010 46,669 46,882 46,347 46,669 46,436 46,165 46,834
5.6 DINTELES EN BLOQUE 0.15 M ML ### 27,987 27,987 27,987 27,987 27,987 28,299 27,987 27,987 27,987 28,032
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 102,669 102,669 102,669 102,669 102,669 102,385 102,669 102,669 102,669 102,759
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 95,336 96,112 93,720 95,918 96,629 94,844 95,918 95,143 94,237 96,468
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 95,363 95,363 95,363 95,363 95,363 95,363 95,363 95,363 95,363 95,363
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 56,081 56,081 56,081 56,081 56,081 56,081 56,081 56,081 56,081 56,081
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 91,880 91,880 91,880 91,880 91,880 91,880 91,880 91,880 91,880 91,880
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,339 54,339 54,339 54,339 54,339 54,339 54,339 54,339 54,339 54,339
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 106,274 106,274 106,274 106,274 106,274 106,274 106,274 106,274 106,274 106,274
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 62,937 62,937 62,937 62,937 62,937 62,937 62,937 62,937 62,937 62,937
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 118,095 118,095 118,095 118,095 118,095 118,095 118,095 118,095 118,095 118,095
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 68,847 68,847 68,847 68,847 68,847 68,847 68,847 68,847 68,847 68,847
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 42,378 42,378 42,378 42,378 42,378 42,235 42,378 42,378 42,378 42,423
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 25,761 25,761 25,761 25,761 25,761 25,690 25,761 25,761 25,761 25,784
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 55,116 55,116 55,116 55,116 55,116 55,021 55,116 55,116 55,116 55,146
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,260 33,260 33,260 33,260 33,260 33,213 33,260 33,260 33,260 33,275
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 62,025 62,025 62,025 62,025 62,025 61,929 62,025 62,025 62,025 62,055
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,428 37,428 37,428 37,428 37,428 37,381 37,428 37,428 37,428 37,443
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 102,776 102,776 102,776 102,776 102,776 102,300 102,776 102,776 102,776 102,926
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 61,012 61,012 61,012 61,012 61,012 60,774 61,012 61,012 61,012 61,087
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 38,897 38,897 38,897 38,897 38,897 38,802 38,897 38,897 38,897 38,927
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,668 23,668 23,668 23,668 23,668 23,621 23,668 23,668 23,668 23,683
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### p 77,257 77,257 77,257 77,257 77,257 77,067 77,257 77,257 77,257 77,317
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### i 46,749 46,749 46,749 46,749 46,749 46,654 46,749 46,749 46,749 46,780
o
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### 91,082 91,082 91,082 91,082 91,082 91,394 91,082 91,082 91,082 91,127
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### 55,440 55,440 55,440 55,440 55,440 55,596 55,440 55,440 55,440 55,462
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 188,503 188,503 188,503 188,503 188,503 187,837 188,503 188,503 188,503 188,714
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 113,749 113,749 113,749 113,749 113,749 113,416 113,749 113,749 113,749 113,855
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 92,946 92,946 92,946 92,946 92,946 92,736 92,946 92,946 92,946 93,040
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 56,372 56,372 56,372 56,372 56,372 56,267 56,372 56,372 56,372 56,419
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 48,707 48,707 48,707 48,707 48,707 48,494 48,707 48,707 48,707 48,774
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 29,758 29,758 29,758 29,758 29,758 29,651 29,758 29,758 29,758 29,792
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 35,240 35,240 35,240 35,240 35,240 35,145 35,240 35,240 35,240 35,271
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,548 21,548 21,548 21,548 21,548 21,501 21,548 21,548 21,548 21,563
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 52,992 52,992 52,992 52,992 52,992 52,801 52,992 52,992 52,992 53,052
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 32,624 32,624 32,624 32,624 32,624 32,529 32,624 32,624 32,624 32,654
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 102,193 102,193 102,193 102,193 102,193 101,907 102,193 102,193 102,193 102,283
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 62,490 62,490 62,490 62,490 62,490 62,347 62,490 62,490 62,490 62,535
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 74,722 74,722 74,722 74,722 74,722 74,532 74,722 74,722 74,722 74,782

5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML ### 45,278 45,278 45,278 45,278 45,278 45,183 45,278 45,278 45,278 45,308

5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 156,668 156,668 156,668 156,668 156,668 156,002 156,668 156,668 156,668 156,878
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML ### 95,689 95,689 95,689 95,689 95,689 95,356 95,689 95,689 95,689 95,794
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 33,151 33,151 33,151 33,151 33,151 33,080 33,151 33,151 33,151 33,173
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 37,641 37,641 37,641 37,641 37,641 37,490 37,641 37,641 37,641 37,708
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 63,731 63,731 63,731 63,731 63,731 63,530 63,731 63,731 63,731 63,821
5.50 LAVADA DE FACHADA M2 ### 5,546 5,546 5,546 5,546 5,546 5,546 5,546 5,546 5,546 5,546
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 53,213 53,368 52,890 53,329 53,471 53,043 53,329 53,174 52,993 53,462
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,159 11,159 11,159 11,159 11,159 11,159 11,159 11,159 11,159 11,159
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,665 14,665 14,665 14,665 14,665 14,665 14,665 14,665 14,665 14,665
5.54 ANCLAJE 1/2" L=50CM UN ### 19,139 19,139 19,139 19,139 19,139 19,139 19,139 19,139 19,139 19,139
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,657 26,657 26,657 26,657 26,657 26,657 26,657 26,657 26,657 26,657
5.56 ANCLAJE 3/4" L=70CM UN ### 39,567 39,567 39,567 39,567 39,567 39,567 39,567 39,567 39,567 39,567
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,263 5,331 5,122 5,314 5,376 5,187 5,314 5,246 5,167 5,357

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,029 17,029 17,029 17,029 17,029 17,029 17,029 17,029 17,029 17,029
6.2 FILOS O DILATACIONES B/PLACA ML ### 5,984 5,984 5,984 5,984 5,984 5,913 5,984 5,984 5,984 6,006
6.3 FILOS O DILATACIONES S/MURO ML ### 7,241 7,241 7,241 7,241 7,241 7,170 7,241 7,241 7,241 7,263
6.4 GOTERA EN MORTERO 1:4 ML ### 8,568 8,568 8,568 8,568 8,568 8,497 8,568 8,568 8,568 8,590
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,120 7,120 7,120 7,120 7,120 7,120 7,120 7,120 7,120 7,120
6.6 MALLA BAJO ENTRAMADO M2 ### 14,401 14,401 14,401 14,401 14,401 14,401 14,401 14,401 14,401 14,401
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,204 25,204 25,204 25,204 25,204 25,057 25,204 25,204 25,204 25,270
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,352 15,352 15,352 15,352 15,352 15,278 15,352 15,352 15,352 15,385
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 21,982 21,982 21,982 21,982 21,982 21,782 21,982 21,982 21,982 22,045
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,412 13,412 13,412 13,412 13,412 13,312 13,412 13,412 13,412 13,443
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,080 21,080 21,080 21,080 21,080 20,933 21,080 21,080 21,080 21,146
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 12,961 12,961 12,961 12,961 12,961 12,887 12,961 12,961 12,961 12,994
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 21,982 21,982 21,982 21,982 21,982 21,782 21,982 21,982 21,982 22,045
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,412 13,412 13,412 13,412 13,412 13,312 13,412 13,412 13,412 13,443
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,369 22,369 22,369 22,369 22,369 22,265 22,369 22,369 22,369 22,416
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,604 13,604 13,604 13,604 13,604 13,552 13,604 13,604 13,604 13,628
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,319 18,319 18,319 18,319 18,319 18,167 18,319 18,319 18,319 18,367
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,275 11,275 11,275 11,275 11,275 11,199 11,275 11,275 11,275 11,299
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### 17,632 17,632 17,632 17,632 17,632 17,520 17,632 17,632 17,632 17,682
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### p 10,931 10,931 10,931 10,931 10,931 10,875 10,931 10,931 10,931 10,956
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### i 22,807 22,807 22,807 22,807 22,807 22,607 22,807 22,807 22,807 22,870
o
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 13,803 13,803 13,803 13,803 13,803 13,703 13,803 13,803 13,803 13,835
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 21,905 21,905 21,905 21,905 21,905 21,758 21,905 21,905 21,905 21,970
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,352 13,352 13,352 13,352 13,352 13,279 13,352 13,352 13,352 13,385
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,279 18,279 18,279 18,279 18,279 18,167 18,279 18,279 18,279 18,329
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,236 11,236 11,236 11,236 11,236 11,180 11,236 11,236 11,236 11,261
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 22,848 22,848 22,848 22,848 22,848 22,701 22,848 22,848 22,848 22,913
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,252 14,252 14,252 14,252 14,252 14,179 14,252 14,252 14,252 14,285

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 27,867 27,867 27,867 27,867 27,867 27,582 27,867 27,867 27,867 27,957
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 (INCLUYE TELA IMPERMEABLE) M2 ### 86,722 87,110 85,914 87,013 87,369 86,476 87,013 86,625 86,173 87,288
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 57,394 57,394 57,394 57,394 57,394 57,394 57,394 57,394 57,394 57,394
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,072 23,072 23,072 23,072 23,072 23,072 23,072 23,072 23,072 23,072
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,158 36,158 36,158 36,158 36,158 36,158 36,158 36,158 36,158 36,158
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 83,692 83,692 83,692 83,692 83,692 83,692 83,692 83,692 83,692 83,692
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 65,662 65,662 65,662 65,662 65,662 65,662 65,662 65,662 65,662 65,662
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,435 38,435 38,435 38,435 38,435 38,435 38,435 38,435 38,435 38,435
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 87,686 87,686 87,686 87,686 87,686 87,686 87,686 87,686 87,686 87,686
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 104,589 104,589 104,589 104,589 104,589 104,589 104,589 104,589 104,589 104,589
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 153,432 153,432 153,432 153,432 153,432 153,432 153,432 153,432 153,432 153,432
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 61,047 61,047 61,047 61,047 61,047 61,047 61,047 61,047 61,047 61,047
7.13 CANAL PVC AMAZONAS ML ### 85,064 85,064 85,064 85,064 85,064 85,064 85,064 85,064 85,064 85,064
7.14 CANAL PVC RAINGO ML ### 77,437 77,437 77,437 77,437 77,437 77,437 77,437 77,437 77,437 77,437
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 136,419 136,419 136,419 136,419 136,419 136,419 136,419 136,419 136,419 136,419
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 79,534 79,534 79,534 79,534 79,534 79,534 79,534 79,534 79,534 79,534
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 58,550 58,550 58,550 58,550 58,550 58,550 58,550 58,550 58,550 58,550
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 33,835 33,835 33,835 33,835 33,835 33,835 33,835 33,835 33,835 33,835
7.19000000000001 TEJA DE BARRO M2 ### 61,694 61,694 61,694 61,694 61,694 61,339 61,694 61,694 61,694 61,806
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 48,792 48,792 48,792 48,792 48,792 48,792 48,792 48,792 48,792 48,792
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 44,762 44,762 44,762 44,762 44,762 44,762 44,762 44,762 44,762 44,762
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,118 38,118 38,118 38,118 38,118 38,118 38,118 38,118 38,118 38,118
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 37,292 37,292 37,292 37,292 37,292 37,292 37,292 37,292 37,292 37,292
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 37,568 37,568 37,568 37,568 37,568 37,568 37,568 37,568 37,568 37,568
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 52,578 52,578 52,578 52,578 52,578 52,578 52,578 52,578 52,578 52,578
7.26 TEJA PLÁSTICA No.6 M2 ### 46,298 46,298 46,298 46,298 46,298 46,298 46,298 46,298 46,298 46,298
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 84,321 84,321 84,321 84,321 84,321 84,321 84,321 84,321 84,321 84,321
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7.28 30MM M2 ### 155,178 155,178 155,178 155,178 155,178 155,178 155,178 155,178 155,178 155,178
7.29000000000001 TEJA SIN TRASLAPO M2 ### 69,955 69,955 69,955 69,955 69,955 69,955 69,955 69,955 69,955 69,955
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 44,714 44,714 44,714 44,714 44,714 44,714 44,714 44,714 44,714 44,714
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 34,897 34,897 34,897 34,897 34,897 34,897 34,897 34,897 34,897 34,897
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM)
M2 ### 60,270 60,270 60,270 60,270 60,270 60,270 60,270 60,270 60,270 60,270
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,062 21,062 21,062 21,062 21,062 21,062 21,062 21,062 21,062 21,062
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,218 25,218 25,218 25,218 25,218 25,218 25,218 25,218 25,218 25,218
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,236 27,236 27,236 27,236 27,236 27,236 27,236 27,236 27,236 27,236
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 34,909 34,909 34,909 34,909 34,909 34,909 34,909 34,909 34,909 34,909
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,192 23,192 23,192 23,192 23,192 23,192 23,192 23,192 23,192 23,192
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 54,522 54,522 54,522 54,522 54,522 54,522 54,522 54,522 54,522 54,522
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 366,556 366,556 366,556 366,556 366,556 366,556 366,556 366,556 366,556 366,556
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 427,894 427,894 427,894 427,894 427,894 427,894 427,894 427,894 427,894 427,894
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### p 280,664 280,664 280,664 280,664 280,664 280,664 280,664 280,664 280,664 280,664
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### i 299,268 299,268 299,268 299,268 299,268 299,268 299,268 299,268 299,268 299,268
o
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 475,653 483,626 459,041 481,633 488,942 470,590 481,633 473,659 464,357 487,281
8.2 CONCRETO 3500 PSI M3 ### 420,898 429,087 403,838 427,040 434,546 413,201 427,040 418,851 409,297 432,482
8.3 CONCRETO 3000 PSI M3 ### 422,825 431,876 403,969 429,613 437,910 412,708 429,613 420,562 410,003 435,396
8.4 CONCRETO 2500 PSI M3 ### 369,396 377,154 353,234 375,215 382,326 364,470 375,215 367,457 358,406 380,710
8.5 CONCRETO 2000 PSI M3 ### 351,802 360,853 332,946 358,590 366,887 342,777 358,590 349,539 338,979 364,530
8.6 CONCRETO 1500 PSI M3 ### 330,058 340,833 307,610 338,139 348,016 315,413 338,139 327,364 314,793 344,649
8.7 MORTERO SECO 1:10 M3 ### 238,317 238,317 238,317 238,317 238,317 228,518 238,317 238,317 238,317 241,415
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 457,532 457,532 457,532 457,532 457,532 448,017 457,532 457,532 457,532 460,541
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 414,596 414,596 414,596 414,596 414,596 407,596 414,596 414,596 414,596 417,717
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 478,395 478,395 478,395 478,395 478,395 471,848 478,395 478,395 478,395 481,314
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 710,675 710,675 710,675 710,675 710,675 704,128 710,675 710,675 710,675 713,594

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 128,047 128,047 128,047 128,047 128,047 128,047 128,047 128,047 128,047 128,047
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,076 4,076 4,076 4,076 4,076 4,005 4,076 4,076 4,076 4,099
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 143,720 143,720 143,720 143,720 143,720 143,720 143,720 143,720 143,720 143,720
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 175,518 175,518 175,518 175,518 175,518 175,518 175,518 175,518 175,518 175,518
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 253,286 253,286 253,286 253,286 253,286 253,286 253,286 253,286 253,286 253,286
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 281,799 281,799 281,799 281,799 281,799 281,799 281,799 281,799 281,799 281,799
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 310,346 310,346 310,346 310,346 310,346 310,346 310,346 310,346 310,346 310,346
9.8 HOJA PUERTA FORTEC 0.81 UN ### 205,828 205,828 205,828 205,828 205,828 205,828 205,828 205,828 205,828 205,828
9.9 HOJA PUERTA FORTEC 0.91 UN ### 233,259 233,259 233,259 233,259 233,259 233,259 233,259 233,259 233,259 233,259
9.10 HOJA PUERTA FORTEC 1.50 UN ### 342,982 342,982 342,982 342,982 342,982 342,982 342,982 342,982 342,982 342,982
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 130,394 130,394 130,394 130,394 130,394 130,394 130,394 130,394 130,394 130,394
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 172,912 172,912 172,912 172,912 172,912 172,912 172,912 172,912 172,912 172,912
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 192,113 192,113 192,113 192,113 192,113 192,113 192,113 192,113 192,113 192,113
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 488,364 488,364 488,364 488,364 488,364 488,364 488,364 488,364 488,364 488,364
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 43,902 43,902 43,902 43,902 43,902 43,902 43,902 43,902 43,902 43,902
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,598 27,598 27,598 27,598 27,598 27,598 27,598 27,598 27,598 27,598
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 103,830 103,830 103,830 103,830 103,830 103,830 103,830 103,830 103,830 103,830
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 125,096 125,096 125,096 125,096 125,096 125,096 125,096 125,096 125,096 125,096
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 97,254 97,254 97,254 97,254 97,254 97,254 97,254 97,254 97,254 97,254
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,378 30,378 30,378 30,378 30,378 30,378 30,378 30,378 30,378 30,378
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,378 30,378 30,378 30,378 30,378 30,378 30,378 30,378 30,378 30,378
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 28,814 28,814 28,814 28,814 28,814 28,814 28,814 28,814 28,814 28,814
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,160 44,160 44,160 44,160 44,160 44,160 44,160 44,160 44,160 44,160
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 54,550 54,550 54,550 54,550 54,550 54,550 54,550 54,550 54,550 54,550
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 65,631 65,631 65,631 65,631 65,631 65,631 65,631 65,631 65,631 65,631
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 78,792 78,792 78,792 78,792 78,792 78,792 78,792 78,792 78,792 78,792
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 369,409 369,409 369,409 369,409 369,409 369,409 369,409 369,409 369,409 369,409
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 258,589 258,589 258,589 258,589 258,589 258,589 258,589 258,589 258,589 258,589
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,156 35,156 35,156 35,156 35,156 35,156 35,156 35,156 35,156 35,156
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 44,853 44,853 44,853 44,853 44,853 44,853 44,853 44,853 44,853 44,853
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 54,550 54,550 54,550 54,550 54,550 54,550 54,550 54,550 54,550 54,550
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 68,402 68,402 68,402 68,402 68,402 68,402 68,402 68,402 68,402 68,402

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN ### 79,215 79,215 79,215 79,215 79,215 79,215 79,215 79,215 79,215 79,215
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### 218,514 218,514 218,514 218,514 218,514 218,514 218,514 218,514 218,514 218,514
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" p
10.3 ML ### 84,151 84,151 84,151 84,151 84,151 84,151 84,151 84,151 84,151 84,151
(INCLUYE ANTICORROSIVO) i
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### o 151,590 151,590 151,590 151,590 151,590 151,590 151,590 151,590 151,590 151,590
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 142,384 142,384 142,384 142,384 142,384 142,384 142,384 142,384 142,384 142,384
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 93,502 93,502 93,502 93,502 93,502 93,502 93,502 93,502 93,502 93,502
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 219,832 219,832 219,832 219,832 219,832 219,832 219,832 219,832 219,832 219,832
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 114,820 114,820 114,820 114,820 114,820 114,820 114,820 114,820 114,820 114,820
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,907 6,907 6,907 6,907 6,907 6,907 6,907 6,907 6,907 6,907
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 TUBO ESTRUCTURAL GALVANIZADO 2") M2 ### 104,737 104,737 104,737 104,737 104,737 104,737 104,737 104,737 104,737 104,737

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA)


10,10(1) H: 2.00 MTS M2 ### 125,691 125,691 125,691 125,691 125,691 125,691 125,691 125,691 125,691 125,691

10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML ### 43,094 43,094 43,094 43,094 43,094 43,094 43,094 43,094 43,094 43,094
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,
10.12 E=6MM
M2 ### 556,421 556,421 556,421 556,421 556,421 556,421 556,421 556,421 556,421 556,421
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 200,726 200,726 200,726 200,726 200,726 200,726 200,726 200,726 200,726 200,726
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 ELECTROSTÁTICA
M2 ### 226,392 226,392 226,392 226,392 226,392 226,392 226,392 226,392 226,392 226,392

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE


10.15 PUERTAS Y ACCESORIOS)
M2 ### 508,038 508,038 508,038 508,038 508,038 508,038 508,038 508,038 508,038 508,038
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.
10.16 ANTICORROSIVO
M2 ### 134,795 134,795 134,795 134,795 134,795 134,795 134,795 134,795 134,795 134,795
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 405,445 405,445 405,445 405,445 405,445 405,445 405,445 405,445 405,445 405,445
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML ### 6,303 6,303 6,303 6,303 6,303 6,303 6,303 6,303 6,303 6,303
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 285,888 285,888 285,888 285,888 285,888 285,888 285,888 285,888 285,888 285,888
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 128,095 128,095 128,095 128,095 128,095 128,095 128,095 128,095 128,095 128,095
10.21 REJILLA PISO 0.30 M M2 ### 89,705 89,705 89,705 89,705 89,705 89,705 89,705 89,705 89,705 89,705
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 92,769 92,769 92,769 92,769 92,769 92,769 92,769 92,769 92,769 92,769
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. KG ### 11,047 11,047 11,047 11,047 11,047 11,047 11,047 11,047 11,047 11,047
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS
10.24 DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 12,237 12,237 12,237 12,237 12,237 12,237 12,237 12,237 12,237 12,237
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO,
MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 9,767 9,767 9,767 9,767 9,767 9,767 9,767 9,767 9,767 9,767
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO


11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 231,939 231,939 231,939 231,939 231,939 231,939 231,939 231,939 231,939 231,939
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 278,741 278,741 278,741 278,741 278,741 278,741 278,741 278,741 278,741 278,741
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,072 23,072 23,072 23,072 23,072 23,072 23,072 23,072 23,072 23,072
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### 36,158 36,158 36,158 36,158 36,158 36,158 36,158 36,158 36,158 36,158
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### 34,805 34,805 34,805 34,805 34,805 34,805 34,805 34,805 34,805 34,805
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### 44,512 44,512 44,512 44,512 44,512 44,512 44,512 44,512 44,512 44,512
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 91,463 91,463 91,463 91,463 91,463 91,463 91,463 91,463 91,463 91,463
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 233,334 233,334 233,334 233,334 233,334 233,334 233,334 233,334 233,334 233,334
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,909 46,909 46,909 46,909 46,909 46,909 46,909 46,909 46,909 46,909
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### p 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### i 36,816 36,816 36,816 36,816 36,816 36,816 36,816 36,816 36,816 36,816
o
11.13 NIPLE PASAMURO 2" UN ### 70,420 70,420 70,420 70,420 70,420 70,420 70,420 70,420 70,420 70,420
11.14 NIPLE PASAMURO 4" UN ### 105,105 105,105 105,105 105,105 105,105 105,105 105,105 105,105 105,105 105,105
11.15 PUNTO AGUA CALIENTE CPVC UN ### 88,316 88,316 88,316 88,316 88,316 88,316 88,316 88,316 88,316 88,316
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 64,945 64,945 64,945 64,945 64,945 64,945 64,945 64,945 64,945 64,945
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 68,959 68,959 68,959 68,959 68,959 68,959 68,959 68,959 68,959 68,959
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 87,111 87,111 87,111 87,111 87,111 87,111 87,111 87,111 87,111 87,111
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 69,874 69,874 69,874 69,874 69,874 69,874 69,874 69,874 69,874 69,874
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 87,009 87,009 87,009 87,009 87,009 87,009 87,009 87,009 87,009 87,009
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 92,946 92,946 92,946 92,946 92,946 92,946 92,946 92,946 92,946 92,946
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 76,571 76,571 76,571 76,571 76,571 76,571 76,571 76,571 76,571 76,571
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,022 13,022 13,022 13,022 13,022 13,022 13,022 13,022 13,022 13,022
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,252 18,252 18,252 18,252 18,252 18,252 18,252 18,252 18,252 18,252
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 23,847 23,847 23,847 23,847 23,847 23,847 23,847 23,847 23,847 23,847
11.26 RED SUMINISTRO PVC 1" ML ### 14,781 14,781 14,781 14,781 14,781 14,781 14,781 14,781 14,781 14,781
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,865 8,865 8,865 8,865 8,865 8,865 8,865 8,865 8,865 8,865
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 52,916 52,916 52,916 52,916 52,916 52,916 52,916 52,916 52,916 52,916
11.29 RED SUMINISTRO PVC 2" ML ### 33,918 33,918 33,918 33,918 33,918 33,918 33,918 33,918 33,918 33,918
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,077 11,077 11,077 11,077 11,077 11,077 11,077 11,077 11,077 11,077
11.31 RED SANITARIA PVC-S 2" ML ### 26,275 26,275 26,275 26,275 26,275 26,275 26,275 26,275 26,275 26,275
11.32 RED SANITARIA PVC-S 3" ML ### 36,391 36,391 36,391 36,391 36,391 36,391 36,391 36,391 36,391 36,391
11.33 RED SANITARIA PVC-S 4" ML ### 49,343 49,343 49,343 49,343 49,343 49,343 49,343 49,343 49,343 49,343
11.34 RED SANITARIA PVC-S 6" ML ### 91,799 91,799 91,799 91,799 91,799 91,799 91,799 91,799 91,799 91,799
11.35 REGISTRO 1" UN ### 111,879 111,879 111,879 111,879 111,879 111,879 111,879 111,879 111,879 111,879
11.36 REGISTRO 1/2" UN ### 62,437 62,437 62,437 62,437 62,437 62,437 62,437 62,437 62,437 62,437
11.37 REGISTRO 3/4" UN ### 79,335 79,335 79,335 79,335 79,335 79,335 79,335 79,335 79,335 79,335
11.38 REGISTRO 1 1/2" UN ### 191,153 191,153 191,153 191,153 191,153 191,153 191,153 191,153 191,153 191,153
11.39 REGISTRO 2 1/2" UN ### 393,409 393,409 393,409 393,409 393,409 393,409 393,409 393,409 393,409 393,409
11.40 REGISTRO 2" UN ### 290,978 290,978 290,978 290,978 290,978 290,978 290,978 290,978 290,978 290,978
11.41 REVENTILACIÓN 2" ML ### 18,365 18,365 18,365 18,365 18,365 18,365 18,365 18,365 18,365 18,365
11.42 REVENTILACIÓN 3" ML ### 23,159 23,159 23,159 23,159 23,159 23,159 23,159 23,159 23,159 23,159
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN)
UN ### 180,054 180,054 180,054 180,054 180,054 180,054 180,054 180,054 180,054 180,054

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E


11.44 ISNTALACIÓN) UN ### 292,373 292,373 292,373 292,373 292,373 292,373 292,373 292,373 292,373 292,373

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E


11.45 INSTALACIÓN)
UN ### 486,015 486,015 486,015 486,015 486,015 486,015 486,015 486,015 486,015 486,015

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS


11.46 Y SOPORTES)
ML ### 41,886 41,886 41,886 41,886 41,886 41,886 41,886 41,886 41,886 41,886

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE


11.47 ACCESORIOS Y SOPORTES)
ML ### 49,385 49,385 49,385 49,385 49,385 49,385 49,385 49,385 49,385 49,385

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS


11.48 Y SOPORTES)
ML ### 63,584 63,584 63,584 63,584 63,584 63,584 63,584 63,584 63,584 63,584

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE


11.49 ACCESORIOS Y SOPORTES) ML ### 71,973 71,973 71,973 71,973 71,973 71,973 71,973 71,973 71,973 71,973

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE


11.50 ACCESORIOS Y SOPORTES)
ML ### 92,734 92,734 92,734 92,734 92,734 92,734 92,734 92,734 92,734 92,734

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE


11.51 ACCESORIOS Y SOPORTES) ML ### 107,761 107,761 107,761 107,761 107,761 107,761 107,761 107,761 107,761 107,761

TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE


11.52 ACCESORIOS Y SOPORTES)
ML ### 159,423 159,423 159,423 159,423 159,423 159,423 159,423 159,423 159,423 159,423
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 64,565 64,565 64,565 64,565 64,565 64,565 64,565 64,565 64,565 64,565
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 64,824 64,824 64,824 64,824 64,824 64,824 64,824 64,824 64,824 64,824
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### p 41,530 41,530 41,530 41,530 41,530 41,530 41,530 41,530 41,530 41,530
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### i 51,075 51,075 51,075 51,075 51,075 51,075 51,075 51,075 51,075 51,075
o
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE
11.57 HASTA 2"
ML ### 4,306 4,306 4,306 4,306 4,306 4,306 4,306 4,306 4,306 4,306

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR


11.58 A 2" ML ### 6,777 6,777 6,777 6,777 6,777 6,777 6,777 6,777 6,777 6,777

11.59 GABINETE TIPO III UN ### 1,049,374 1,049,374 1,049,374 1,049,374 1,049,374 1,049,374 1,049,374 1,049,374 1,049,374 1,049,374
11.60 GABINETE TIPO I UN ### 802,773 802,773 802,773 802,773 802,773 802,773 802,773 802,773 802,773 802,773
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,689,115 2,689,115 2,689,115 2,689,115 2,689,115 2,689,115 2,689,115 2,689,115 2,689,115 2,689,115
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,243,006 2,243,006 2,243,006 2,243,006 2,243,006 2,243,006 2,243,006 2,243,006 2,243,006 2,243,006
11.63 VÁLVULA MARIPOSA 3" UN ### 655,075 655,075 655,075 655,075 655,075 655,075 655,075 655,075 655,075 655,075
11.64 VÁLVULA MARIPOSA 4" UN ### 845,992 845,992 845,992 845,992 845,992 845,992 845,992 845,992 845,992 845,992
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 323,970 323,970 323,970 323,970 323,970 323,970 323,970 323,970 323,970 323,970

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 377,039 377,039 377,039 377,039 377,039 377,039 377,039 377,039 377,039 377,039
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 59,897 59,897 59,897 59,897 59,897 59,897 59,897 59,897 59,897 59,897
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 70,817 70,817 70,817 70,817 70,817 70,817 70,817 70,817 70,817 70,817
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 78,732 78,732 78,732 78,732 78,732 78,732 78,732 78,732 78,732 78,732
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 92,615 92,615 92,615 92,615 92,615 92,615 92,615 92,615 92,615 92,615
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 56,365 56,365 56,365 56,365 56,365 56,365 56,365 56,365 56,365 56,365
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 64,203 64,203 64,203 64,203 64,203 64,203 64,203 64,203 64,203 64,203
12.8 STRIP TELEFÓNICO 10 PARES UN ### 148,798 148,798 148,798 148,798 148,798 148,798 148,798 148,798 148,798 148,798
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 57,840 57,840 57,840 57,840 57,840 57,840 57,840 57,840 57,840 57,840
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 132,797 132,797 132,797 132,797 132,797 132,797 132,797 132,797 132,797 132,797
12.11 SALIDA T.V PVC COMPLETA. UN ### 79,516 79,516 79,516 79,516 79,516 79,516 79,516 79,516 79,516 79,516
12.12 SALIDA BIFÁSICA C.N. UN ### 47,140 47,140 47,140 47,140 47,140 47,140 47,140 47,140 47,140 47,140
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 99,618 99,618 99,618 99,618 99,618 99,618 99,618 99,618 99,618 99,618
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 425,620 425,620 425,620 425,620 425,620 425,620 425,620 425,620 425,620 425,620
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 566,355 566,355 566,355 566,355 566,355 566,355 566,355 566,355 566,355 566,355
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,665 3,665 3,665 3,665 3,665 3,665 3,665 3,665 3,665 3,665
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,843 4,843 4,843 4,843 4,843 4,843 4,843 4,843 4,843 4,843
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,526 7,526 7,526 7,526 7,526 7,526 7,526 7,526 7,526 7,526
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,468 13,468 13,468 13,468 13,468 13,468 13,468 13,468 13,468 13,468
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 282,711 282,711 282,711 282,711 282,711 282,711 282,711 282,711 282,711 282,711
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 80,074 80,074 80,074 80,074 80,074 80,074 80,074 80,074 80,074 80,074
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 108,078 108,078 108,078 108,078 108,078 108,078 108,078 108,078 108,078 108,078
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 44,645 44,645 44,645 44,645 44,645 44,645 44,645 44,645 44,645 44,645
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,452,528 1,452,528 1,452,528 1,452,528 1,452,528 1,452,528 1,452,528 1,452,528 1,452,528 1,452,528
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,076,393 1,076,393 1,076,393 1,076,393 1,076,393 1,076,393 1,076,393 1,076,393 1,076,393 1,076,393
12.26 POSTE METÁLICO 6M UN ### 1,336,605 1,336,605 1,336,605 1,336,605 1,336,605 1,336,605 1,336,605 1,336,605 1,336,605 1,336,605
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 621,011 621,011 621,011 621,011 621,011 621,011 621,011 621,011 621,011 621,011
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 114,073 114,073 114,073 114,073 114,073 114,073 114,073 114,073 114,073 114,073
12.29 LUMINARIA 70W SODIO UN ### 520,826 520,826 520,826 520,826 520,826 520,826 520,826 520,826 520,826 520,826
12.30 LUMINARIA 150W SODIO UN ### 651,294 651,294 651,294 651,294 651,294 651,294 651,294 651,294 651,294 651,294
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### 1,718,306 1,718,306 1,718,306 1,718,306 1,718,306 1,718,306 1,718,306 1,718,306 1,718,306 1,718,306
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,265,702 1,265,702 1,265,702 1,265,702 1,265,702 1,265,702 1,265,702 1,265,702 1,265,702 1,265,702

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,003 41,003 41,003 41,003 41,003 40,752 41,003 41,003 41,003 41,116
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 40,465 40,465 40,465 40,465 40,465 40,214 40,465 40,465 40,465 40,578
13.3 ALISTADO PARA LISTÓN M2 ### 15,409 15,409 15,409 15,409 15,409 15,359 15,409 15,409 15,409 15,432
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 28,099 28,099 28,099 28,099 28,099 27,595 28,099 28,099 28,099 28,323
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### p 87,032 87,032 87,032 87,032 87,032 86,529 87,032 87,032 87,032 87,257
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### i 28,463 28,644 28,086 28,599 28,765 28,283 28,599 28,418 28,207 28,718
o
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 60,983 61,759 59,367 61,565 62,276 60,491 61,565 60,789 59,884 62,115
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 84,406 85,647 81,820 85,337 86,475 83,618 85,337 84,096 82,647 86,216
13.9 MANTO FIBERGLASS 600X1 M2 ### 31,691 31,691 31,691 31,691 31,691 31,691 31,691 31,691 31,691 31,691
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,196 24,196 24,196 24,196 24,196 24,196 24,196 24,196 24,196 24,196
13.11 PERMA PLY 2 CAPAS M2 ### 28,474 28,474 28,474 28,474 28,474 28,474 28,474 28,474 28,474 28,474
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 49,608 50,306 48,153 50,131 50,771 49,164 50,131 49,433 48,619 50,626
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 58,100 58,953 56,322 58,740 59,522 57,558 58,740 57,886 56,891 59,344
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 84,119 85,438 81,371 85,108 86,317 83,282 85,108 83,789 82,251 86,042
13.15 TRITURADO FINO 1/2 M3 ### 138,374 149,472 115,253 146,697 156,871 115,253 146,697 135,599 122,651 152,247
13.16 TRITURADO GRUESO 3/4 M3 ### 144,887 156,359 119,163 151,202 164,670 129,113 153,757 145,867 135,202 157,064

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 59,697 59,697 59,697 59,697 59,697 59,596 59,697 59,697 59,697 59,742
14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML ### 35,859 35,859 35,859 35,859 35,859 35,809 35,859 35,859 35,859 35,882
14.3 ADOQUÍN CONCRETO 6CM M2 ### 67,928 67,928 67,928 67,928 67,928 67,676 67,928 67,928 67,928 68,040
14.4 ADOQUÍN CONCRETO 8CM M2 ### 71,378 71,378 71,378 71,378 71,378 71,126 71,378 71,378 71,378 71,490
14.5 ADOQUÍN GRES PEATONAL M2 ### 75,825 75,825 75,825 75,825 75,825 75,573 75,825 75,825 75,825 75,937
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 BLANCO. INCLUYE ALISTADO M2 ### 78,460 78,460 78,460 78,460 78,460 78,359 78,460 78,460 78,460 78,505
14.7 GRAVILLA PARA GRADAS ML ### 40,023 40,131 39,799 40,104 40,203 39,748 40,104 39,996 39,871 40,180
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 ### 169,990 169,990 169,990 169,990 169,990 169,537 169,990 169,990 169,990 170,192
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 49,798 50,013 49,349 49,959 50,157 49,198 49,959 49,744 49,492 50,134
14.10 GUARDAESCOBA EN GRANITO ML ### 46,485 46,485 46,485 46,485 46,485 46,485 46,485 46,485 46,485 46,485
14.11 GUARDAESCOBA EN GRAVILLA ML ### 11,114 11,222 10,890 11,195 11,294 10,839 11,195 11,087 10,962 11,271
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,764 9,764 9,764 9,764 9,764 9,764 9,764 9,764 9,764 9,764
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,086 13,086 13,086 13,086 13,086 13,086 13,086 13,086 13,086 13,086
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,088 11,088 11,088 11,088 11,088 11,088 11,088 11,088 11,088 11,088
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,433 18,433 18,433 18,433 18,433 18,433 18,433 18,433 18,433 18,433
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 35,714 35,714 35,714 35,714 35,714 35,714 35,714 35,714 35,714 35,714
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,850 9,850 9,850 9,850 9,850 9,850 9,850 9,850 9,850 9,850
14.18 LISTÓN M.H. AMARILLO M2 ### 78,151 78,151 78,151 78,151 78,151 78,151 78,151 78,151 78,151 78,151
14.19 PASO ESCALERA GRANITO ML ### 124,000 124,000 124,000 124,000 124,000 123,647 124,000 124,000 124,000 124,157
14.20 PIRLANES ALUMINIO ML ### 8,090 8,090 8,090 8,090 8,090 8,090 8,090 8,090 8,090 8,090
14.21 PIRLANES LADRILLO ML ### 33,783 33,783 33,783 33,783 33,783 33,641 33,783 33,783 33,783 33,828
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 47,933 47,933 47,933 47,933 47,933 47,933 47,933 47,933 47,933 47,933
14.23 PISO VINILO TRÁFICO PESADO M2 ### 55,608 55,608 55,608 55,608 55,608 55,608 55,608 55,608 55,608 55,608
14.24 PULIDA LACADA PISO MADERA M2 ### 51,839 51,839 51,839 51,839 51,839 51,839 51,839 51,839 51,839 51,839
14.25 TABLETA DE GRES 25X25 M2 ### 51,816 51,816 51,816 51,816 51,816 51,715 51,816 51,816 51,816 51,861
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,089 58,089 58,089 58,089 58,089 57,988 58,089 58,089 58,089 58,134
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML ### 11,636 11,636 11,636 11,636 11,636 11,636 11,636 11,636 11,636 11,636
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### 51,840 51,840 51,840 51,840 51,840 51,627 51,840 51,840 51,840 51,907
14.29 JABONERA PORCELANA ACUARIO UN ### 21,565 21,565 21,565 21,565 21,565 21,565 21,565 21,565 21,565 21,565
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 128,669 128,669 128,669 128,669 128,669 128,669 128,669 128,669 128,669 128,669
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,587 10,587 10,587 10,587 10,587 10,587 10,587 10,587 10,587 10,587
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,592 23,592 23,592 23,592 23,592 23,592 23,592 23,592 23,592 23,592
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,250 15,250 15,250 15,250 15,250 15,250 15,250 15,250 15,250 15,250
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,825 14,825 14,825 14,825 14,825 14,825 14,825 14,825 14,825 14,825
14.35 REMATES BOCEL ALUMINIO ML ### 9,126 9,126 9,126 9,126 9,126 9,126 9,126 9,126 9,126 9,126
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
14.36 REMATES BOCEL PORCELANA ML ### p 9,281 9,281 9,281 9,281 9,281 9,281 9,281 9,281 9,281 9,281
14.37 TAPA REGISTRO 20X20 UN ### i 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036
o
14.38 TAPA REGISTRO 6X6 UN ### 18,288 18,288 18,288 18,288 18,288 18,288 18,288 18,288 18,288 18,288
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL
14.39 N.5
M2 ### 19,339 19,339 19,339 19,339 19,339 19,339 19,339 19,339 19,339 19,339
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 FUNDIDO EN SITIO
M2 ### 22,356 22,356 22,356 22,356 22,356 22,356 22,356 22,356 22,356 22,356
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 67,968 67,968 67,968 67,968 67,968 67,868 67,968 67,968 67,968 68,013
14.42 MEDIA CAÑA EN GRANITO ML ### 80,530 80,530 80,530 80,530 80,530 80,530 80,530 80,530 80,530 80,530
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,598 36,598 36,598 36,598 36,598 36,598 36,598 36,598 36,598 36,598
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 13,966 13,966 13,966 13,966 13,966 13,966 13,966 13,966 13,966 13,966
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 ### 105,447 105,447 105,447 105,447 105,447 105,447 105,447 105,447 105,447 105,447
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 127,919 127,919 127,919 127,919 127,919 127,919 127,919 127,919 127,919 127,919

15 CIELO RASO
15.1 APLIQUE YESO ML ### 75,707 75,707 75,707 75,707 75,707 75,707 75,707 75,707 75,707 75,707
15.2 ARMADURA MADERA Y MALLA M2 ### 38,251 38,251 38,251 38,251 38,251 38,251 38,251 38,251 38,251 38,251
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 58,323 58,323 58,323 58,323 58,323 58,323 58,323 58,323 58,323 58,323
15.4 CIELO RASO DURACUSTIC M2 ### 71,341 71,341 71,341 71,341 71,341 71,341 71,341 71,341 71,341 71,341
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 53,335 53,335 53,335 53,335 53,335 53,335 53,335 53,335 53,335 53,335
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 98,481 98,481 98,481 98,481 98,481 98,481 98,481 98,481 98,481 98,481
15.7 CORNISAS YESO ML ### 50,755 50,755 50,755 50,755 50,755 50,755 50,755 50,755 50,755 50,755
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 108,635 108,635 108,635 108,635 108,635 108,635 108,635 108,635 108,635 108,635
15.9 MALLA CON VENA M2 ### 14,303 14,303 14,303 14,303 14,303 14,303 14,303 14,303 14,303 14,303

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
16.2 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE


16.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### 118,393 127,181 92,029 114,878 135,969 135,969 126,429 133,460 135,217 119,446
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ### 147,402 159,255 122,710 156,292 167,156 122,710 156,292 144,439 130,611 162,218
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 MECÁNICAMENTE
M3 ### 141,069 218,403 123,493 206,100 176,221 176,221 221,918 207,857 190,281 152,754
16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 107,548 116,336 81,184 104,032 125,124 125,124 133,912 123,366 107,548 100,621
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 140,512 191,482 113,077 179,179 158,088 149,300 194,998 174,593 163,361 131,724
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 137,503 214,837 119,927 202,534 172,655 172,655 218,352 204,291 186,715 149,188

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN ### 314,357 314,357 314,357 314,357 314,357 314,357 314,357 314,357 314,357 314,357

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE


17.2 GRIFERÍA)
UN ### 923,105 923,105 923,105 923,105 923,105 923,105 923,105 923,105 923,105 923,105
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE p
17.3 GRIFERÍA)
UN ### i 500,943 500,943 500,943 500,943 500,943 500,943 500,943 500,943 500,943 500,943
o
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE
17.4 GRIFERÍA)
UN ### 146,820 146,820 146,820 146,820 146,820 146,820 146,820 146,820 146,820 146,820

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE


17.5 GRIFERÍA)
UN ### 204,498 204,498 204,498 204,498 204,498 204,498 204,498 204,498 204,498 204,498

SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE


17.6 GRIFERÍA) UN ### 190,055 190,055 190,055 190,055 190,055 190,055 190,055 190,055 190,055 190,055

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN ### 416,045 416,045 416,045 416,045 416,045 416,045 416,045 416,045 416,045 416,045

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE


17.8 GRIFERÍA)
UN ### 1,061,275 1,061,275 1,061,275 1,061,275 1,061,275 1,061,275 1,061,275 1,061,275 1,061,275 1,061,275

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN ### 302,757 302,757 302,757 302,757 302,757 302,757 302,757 302,757 302,757 302,757

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A


17.10 BAÑERA
UN ### 215,260 215,260 215,260 215,260 215,260 215,260 215,260 215,260 215,260 215,260
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 86,741 86,741 86,741 86,741 86,741 86,741 86,741 86,741 86,741 86,741

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO


17.12 INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 259,964 259,964 259,964 259,964 259,964 259,964 259,964 259,964 259,964 259,964

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN


17.13 ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
UN ### 382,031 382,031 382,031 382,031 382,031 382,031 382,031 382,031 382,031 382,031

18 PINTURAS

18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 ### 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248 3,248
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,797 11,797 11,797 11,797 11,797 11,797 11,797 11,797 11,797 11,797
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,404 44,404 44,404 44,404 44,404 44,404 44,404 44,404 44,404 44,404
18.5 CARBURO SOBRE PAÑETES M2 ### 6,179 6,179 6,179 6,179 6,179 6,179 6,179 6,179 6,179 6,179
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 68,152 68,152 68,152 68,152 68,152 68,152 68,152 68,152 68,152 68,152
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,686 3,686 3,686 3,686 3,686 3,686 3,686 3,686 3,686 3,686
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,920 2,920 2,920 2,920 2,920 2,920 2,920 2,920 2,920 2,920
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,714 14,714 14,714 14,714 14,714 14,714 14,714 14,714 14,714 14,714
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,252 4,252 4,252 4,252 4,252 4,252 4,252 4,252 4,252 4,252
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,510 15,510 15,510 15,510 15,510 15,510 15,510 15,510 15,510 15,510
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### 6,005 6,005 6,005 6,005 6,005 6,005 6,005 6,005 6,005 6,005
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### 6,848 6,848 6,848 6,848 6,848 6,848 6,848 6,848 6,848 6,848
18.14 ESTUCO M2 ### 7,451 7,451 7,451 7,451 7,451 7,451 7,451 7,451 7,451 7,451
18.15 ESTUCO (LINEAL) ML ### 4,674 4,674 4,674 4,674 4,674 4,674 4,674 4,674 4,674 4,674
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,396 16,396 16,396 16,396 16,396 16,396 16,396 16,396 16,396 16,396
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,190 10,190 10,190 10,190 10,190 10,190 10,190 10,190 10,190 10,190
18.18 LACA PISOS MADERA M2 ### 24,153 24,153 24,153 24,153 24,153 24,153 24,153 24,153 24,153 24,153
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,842 2,842 2,842 2,842 2,842 2,842 2,842 2,842 2,842 2,842
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,745 12,745 12,745 12,745 12,745 12,745 12,745 12,745 12,745 12,745
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,443 3,443 3,443 3,443 3,443 3,443 3,443 3,443 3,443 3,443
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,284 13,284 13,284 13,284 13,284 13,284 13,284 13,284 13,284 13,284
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,480 7,480 7,480 7,480 7,480 7,480 7,480 7,480 7,480 7,480
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,716 4,716 4,716 4,716 4,716 4,716 4,716 4,716 4,716 4,716
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 22,863 22,863 22,863 22,863 22,863 22,863 22,863 22,863 22,863 22,863
18.26 PINTURA EPÓXICA M2 ### 13,422 13,422 13,422 13,422 13,422 13,422 13,422 13,422 13,422 13,422
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
19 DOTACIONES DEPORTIVAS p
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### i 6,274,895 6,274,895 6,274,895 6,274,895 6,274,895 6,274,895 6,274,895 6,274,895 6,274,895 6,274,895
o
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR) UN ### 11,086,812 11,086,812 ### 11,086,812 11,086,812 11,086,812 11,086,812 11,086,812 11,086,812 11,086,812
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,901,646 2,901,646 2,901,646 2,901,646 2,901,646 2,901,646 2,901,646 2,901,646 2,901,646 2,901,646
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN ### 9,482,264 9,482,264 9,482,264 9,482,264 9,482,264 9,482,264 9,482,264 9,482,264 9,482,264 9,482,264
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 8,878,772 8,878,772 8,878,772 8,878,772 8,878,772 8,878,772 8,878,772 8,878,772 8,878,772 8,878,772
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,842 2,842 2,842 2,842 2,842 2,842 2,842 2,842 2,842 2,842
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 891,630 891,630 891,630 891,630 891,630 891,630 891,630 891,630 891,630 891,630
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 88,936 88,936 88,936 88,936 88,936 88,936 88,936 88,936 88,936 88,936
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,611,865 1,611,945 1,611,699 1,611,925 1,611,998 1,611,814 1,611,925 1,611,845 1,611,752 1,611,981
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 704,710 706,973 699,996 706,407 708,481 702,181 706,407 704,144 701,504 707,853

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,457 30,457 30,457 30,457 30,457 30,457 30,457 30,457 30,457 30,457
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 45,227 45,227 45,227 45,227 45,227 45,227 45,227 45,227 45,227 45,227
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 56,067 56,067 56,067 56,067 56,067 56,067 56,067 56,067 56,067 56,067
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20.4 ACCESORIOS)
ML ### 18,328 18,328 18,328 18,328 18,328 18,328 18,328 18,328 18,328 18,328

TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE


20.5 ACCESORIOS)
ML ### 22,201 22,201 22,201 22,201 22,201 22,201 22,201 22,201 22,201 22,201

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML ### 30,251 30,251 30,251 30,251 30,251 30,251 30,251 30,251 30,251 30,251

20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,056 27,056 27,056 27,056 27,056 27,056 27,056 27,056 27,056 27,056
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,537 28,537 28,537 28,537 28,537 28,537 28,537 28,537 28,537 28,537
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 35,679 35,679 35,679 35,679 35,679 35,679 35,679 35,679 35,679 35,679
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,360 18,360 18,360 18,360 18,360 18,360 18,360 18,360 18,360 18,360
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,038 24,038 24,038 24,038 24,038 24,038 24,038 24,038 24,038 24,038
20.12 VÁLVULA DE BOLA GAS 1" UN ### 36,914 36,914 36,914 36,914 36,914 36,914 36,914 36,914 36,914 36,914
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 282,122 282,122 282,122 282,122 282,122 282,122 282,122 282,122 282,122 282,122
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 324,656 324,656 324,656 324,656 324,656 324,656 324,656 324,656 324,656 324,656
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 338,672 338,672 338,672 338,672 338,672 338,672 338,672 338,672 338,672 338,672
20.16 ACOMETIDA GAS 1/2" ML ### 314,699 314,699 314,699 314,699 314,699 314,699 314,699 314,699 314,699 314,699

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 229,865 229,865 229,865 229,865 229,865 229,865 229,865 229,865 229,865 229,865
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 35,146 35,146 35,146 35,146 35,146 35,146 35,146 35,146 35,146 35,146
21.3 SIRENA DE 110 V UN ### 107,590 107,590 107,590 107,590 107,590 107,590 107,590 107,590 107,590 107,590
21.4 CÁMARA CCTV UN ### 275,421 275,421 275,421 275,421 275,421 275,421 275,421 275,421 275,421 275,421
21.5 PARLANTE-CIELO FALSO UN ### 54,362 54,362 54,362 54,362 54,362 54,362 54,362 54,362 54,362 54,362
21.6 AMPLIFICADOR 100W UN ### 595,487 595,487 595,487 595,487 595,487 595,487 595,487 595,487 595,487 595,487
21.7 AMPLIFICADOR 300W UN ### 1,471,685 1,471,685 1,471,685 1,471,685 1,471,685 1,471,685 1,471,685 1,471,685 1,471,685 1,471,685
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,681 47,681 47,681 47,681 47,681 47,681 47,681 47,681 47,681 47,681
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 229,635 229,635 229,635 229,635 229,635 229,635 229,635 229,635 229,635 229,635
21.10 TOMA PARA MICRÓFONO UN ### 46,151 46,151 46,151 46,151 46,151 46,151 46,151 46,151 46,151 46,151
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,918 3,918 3,918 3,918 3,918 3,918 3,918 3,918 3,918 3,918
21.12 SPLITERS UN ### 6,547 6,547 6,547 6,547 6,547 6,547 6,547 6,547 6,547 6,547
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,703 19,703 19,703 19,703 19,703 19,703 19,703 19,703 19,703 19,703
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,753 25,753 25,753 25,753 25,753 25,753 25,753 25,753 25,753 25,753
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,417 33,417 33,417 33,417 33,417 33,417 33,417 33,417 33,417 33,417
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 127,454 127,454 127,454 127,454 127,454 127,454 127,454 127,454 127,454 127,454
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML ### 33,264 33,264 33,264 33,264 33,264 33,264 33,264 33,264 33,264 33,264
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
21.18 BANDEJA PORTACABLES PARA RACK UN ### p 108,529 108,529 108,529 108,529 108,529 108,529 108,529 108,529 108,529 108,529
21.19 RACK 2' X 24" UN ### i 192,943 192,943 192,943 192,943 192,943 192,943 192,943 192,943 192,943 192,943
o
21.20 RACK 3' X 24" UN ### 301,294 301,294 301,294 301,294 301,294 301,294 301,294 301,294 301,294 301,294
21.21 RACK 5' X 24" UN ### 375,136 375,136 375,136 375,136 375,136 375,136 375,136 375,136 375,136 375,136
21.22 RACK 7' X 24" UN ### 409,424 409,424 409,424 409,424 409,424 409,424 409,424 409,424 409,424 409,424
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 602,283 602,283 602,283 602,283 602,283 602,283 602,283 602,283 602,283 602,283
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 355,576 355,576 355,576 355,576 355,576 355,576 355,576 355,576 355,576 355,576
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN ### 108,057 108,057 108,057 108,057 108,057 108,057 108,057 108,057 108,057 108,057
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,350 14,350 14,350 14,350 14,350 14,350 14,350 14,350 14,350 14,350
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,300 29,300 29,300 29,300 29,300 29,300 29,300 29,300 29,300 29,300
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,231 5,231 5,231 5,231 5,231 5,231 5,231 5,231 5,231 5,231
21.29 CANALETA METÁLICA 4X6 CMS ML ### 36,972 36,972 36,972 36,972 36,972 36,972 36,972 36,972 36,972 36,972
21.30 CANALETA METÁLICA 4X10 CMS ML ### 38,607 38,607 38,607 38,607 38,607 38,607 38,607 38,607 38,607 38,607
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,424 39,424 39,424 39,424 39,424 39,424 39,424 39,424 39,424 39,424
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 25,731 25,731 25,731 25,731 25,731 25,731 25,731 25,731 25,731 25,731
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,419 28,419 28,419 28,419 28,419 28,419 28,419 28,419 28,419 28,419
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,548 29,548 29,548 29,548 29,548 29,548 29,548 29,548 29,548 29,548
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 49,403 49,403 49,403 49,403 49,403 49,403 49,403 49,403 49,403 49,403
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 637,319 637,319 637,319 637,319 637,319 637,319 637,319 637,319 637,319 637,319
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 328,150 328,150 328,150 328,150 328,150 328,150 328,150 328,150 328,150 328,150
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 93,043 93,043 93,043 93,043 93,043 93,043 93,043 93,043 93,043 93,043
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,924 1,924 1,924 1,924 1,924 1,924 1,924 1,924 1,924 1,924
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,871 8,871 8,871 8,871 8,871 8,871 8,871 8,871 8,871 8,871
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,178 13,178 13,178 13,178 13,178 13,178 13,178 13,178 13,178 13,178
21.42 CABLE TELEFÓNICO 40 PARES ML ### 21,952 21,952 21,952 21,952 21,952 21,952 21,952 21,952 21,952 21,952
21.43 CABLE TELEVISIÓN RG6 ML ### 4,087 4,087 4,087 4,087 4,087 4,087 4,087 4,087 4,087 4,087
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,683 23,683 23,683 23,683 23,683 23,683 23,683 23,683 23,683 23,683
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,320 34,320 34,320 34,320 34,320 34,320 34,320 34,320 34,320 34,320
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,372 20,372 20,372 20,372 20,372 20,372 20,372 20,372 20,372 20,372
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN)
ML ### 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,073 16,073
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 641,256 641,256 641,256 641,256 641,256 641,256 641,256 641,256 641,256 641,256
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
p URBANISMO
i
1 ACUEDUCTO o
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### 28,166 28,166 28,166 28,166 28,166 28,166 28,166 28,166 28,166 28,166
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 93,930 93,930 93,930 93,930 93,930 93,930 93,930 93,930 93,930 93,930
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 527,870 527,870 527,870 527,870 527,870 527,870 527,870 527,870 527,870 527,870
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,126,599 1,126,599 1,126,599 1,126,599 1,126,599 1,126,599 1,126,599 1,126,599 1,126,599 1,126,599
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 129,319 129,319 129,319 129,319 129,319 129,319 129,319 129,319 129,319 129,319
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 786,464 786,464 786,464 786,464 786,464 786,464 786,464 786,464 786,464 786,464
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,691,820 1,691,820 1,691,820 1,691,820 1,691,820 1,691,820 1,691,820 1,691,820 1,691,820 1,691,820
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,740 13,740 13,740 13,740 13,740 13,740 13,740 13,740 13,740 13,740
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 16,891 16,891 16,891 16,891 16,891 16,891 16,891 16,891 16,891 16,891
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,147 21,147 21,147 21,147 21,147 21,147 21,147 21,147 21,147 21,147
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 23,122 23,122 23,122 23,122 23,122 23,122 23,122 23,122 23,122 23,122
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671 27,671
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 110,444 110,444 110,444 110,444 110,444 110,444 110,444 110,444 110,444 110,444
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 127,960 127,960 127,960 127,960 127,960 127,960 127,960 127,960 127,960 127,960
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 395,852 395,852 395,852 395,852 395,852 395,852 395,852 395,852 395,852 395,852
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 148,600 148,600 148,600 148,600 148,600 148,600 148,600 148,600 148,600 148,600
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 244,970 244,970 244,970 244,970 244,970 244,970 244,970 244,970 244,970 244,970
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,083,263 1,083,263 1,083,263 1,083,263 1,083,263 1,083,263 1,083,263 1,083,263 1,083,263 1,083,263
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,247,984 1,247,984 1,247,984 1,247,984 1,247,984 1,247,984 1,247,984 1,247,984 1,247,984 1,247,984
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 14,822 14,822 14,822 14,822 14,822 14,822 14,822 14,822 14,822 14,822
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,101 13,101 13,101 13,101 13,101 13,101 13,101 13,101 13,101 13,101
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 31,913 31,913 31,913 31,913 31,913 31,913 31,913 31,913 31,913 31,913
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 127,142 127,142 127,142 127,142 127,142 127,142 127,142 127,142 127,142 127,142
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 189,022 189,022 189,022 189,022 189,022 189,022 189,022 189,022 189,022 189,022
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 31,041 31,041 31,041 31,041 31,041 31,041 31,041 31,041 31,041 31,041
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 106,689 106,689 106,689 106,689 106,689 106,689 106,689 106,689 106,689 106,689
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 157,793 157,793 157,793 157,793 157,793 157,793 157,793 157,793 157,793 157,793
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 31,307 31,307 31,307 31,307 31,307 31,307 31,307 31,307 31,307 31,307
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 64,476 64,476 64,476 64,476 64,476 64,476 64,476 64,476 64,476 64,476
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 259,041 259,041 259,041 259,041 259,041 259,041 259,041 259,041 259,041 259,041
1.32 UNIÓN REPARACION PVC 4" UN ### 75,174 75,174 75,174 75,174 75,174 75,174 75,174 75,174 75,174 75,174
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 301,285 301,285 301,285 301,285 301,285 301,285 301,285 301,285 301,285 301,285
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 181,393 181,393 181,393 181,393 181,393 181,393 181,393 181,393 181,393 181,393
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 514,193 514,193 514,193 514,193 514,193 514,193 514,193 514,193 514,193 514,193
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,374,651 1,374,651 1,374,651 1,374,651 1,374,651 1,374,651 1,374,651 1,374,651 1,374,651 1,374,651
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,031,084 2,031,084 2,031,084 2,031,084 2,031,084 2,031,084 2,031,084 2,031,084 2,031,084 2,031,084

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,344 11,344 11,344 11,344 11,344 11,344 11,344 11,344 11,344 11,344
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 25,968 25,968 25,968 25,968 25,968 25,968 25,968 25,968 25,968 25,968
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 123,039 134,092 100,010 131,329 141,461 100,010 131,329 120,275 107,379 136,856
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 113,101 121,889 86,737 109,586 130,677 130,677 121,138 128,168 129,926 114,154
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 113,101 121,889 86,737 109,586 130,677 130,677 139,465 128,919 113,101 106,175
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 112,877 142,598 112,877 166,170 135,424 146,500 148,747 128,250 137,474 118,002
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 64,357 108,237 64,357 108,237 90,476 90,476 95,700 89,431 80,029 77,144
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 85,571 85,571 85,571 85,571 85,571 76,340 85,571 85,571 85,571 88,489

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 118,050 118,050 118,050 118,050 118,050 118,050 118,050 118,050 118,050 118,050
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### p 1,229,166 1,229,166 1,229,166 1,229,166 1,229,166 1,229,166 1,229,166 1,229,166 1,229,166 1,229,166
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### i 154,217 154,217 154,217 154,217 154,217 154,217 154,217 154,217 154,217 154,217
o
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### 1,423,649 1,423,649 1,423,649 1,423,649 1,423,649 1,423,649 1,423,649 1,423,649 1,423,649 1,423,649
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 992,404 992,404 992,404 992,404 992,404 992,404 992,404 992,404 992,404 992,404
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,254 63,254 63,254 63,254 63,254 63,254 63,254 63,254 63,254 63,254
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 117,189 117,189 117,189 117,189 117,189 117,189 117,189 117,189 117,189 117,189
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 276,527 276,527 276,527 276,527 276,527 276,527 276,527 276,527 276,527 276,527
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 443,871 443,871 443,871 443,871 443,871 443,871 443,871 443,871 443,871 443,871
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 117,239 117,239 117,239 117,239 117,239 117,239 117,239 117,239 117,239 117,239
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 117,239 117,239 117,239 117,239 117,239 117,239 117,239 117,239 117,239 117,239
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533 276,533
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 443,871 443,871 443,871 443,871 443,871 443,871 443,871 443,871 443,871 443,871
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 446,327 446,327 446,327 446,327 446,327 446,327 446,327 446,327 446,327 446,327
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 724,143 724,143 724,143 724,143 724,143 724,143 724,143 724,143 724,143 724,143
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,162,056 1,162,056 1,162,056 1,162,056 1,162,056 1,162,056 1,162,056 1,162,056 1,162,056 1,162,056
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 71,923 71,923 71,923 71,923 71,923 71,923 71,923 71,923 71,923 71,923
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 373,636 373,636 373,636 373,636 373,636 373,636 373,636 373,636 373,636 373,636
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 418,487 418,487 418,487 418,487 418,487 418,487 418,487 418,487 418,487 418,487
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,157,709 1,157,709 1,157,709 1,157,709 1,157,709 1,157,709 1,157,709 1,157,709 1,157,709 1,157,709
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 67,758 67,758 67,758 67,758 67,758 67,663 67,758 67,758 67,758 67,788
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 338,802 338,802 338,802 338,802 338,802 338,802 338,802 338,802 338,802 338,802
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 51,597 51,597 51,597 51,597 51,597 51,597 51,597 51,597 51,597 51,597
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 72,903 72,903 72,903 72,903 72,903 72,903 72,903 72,903 72,903 72,903
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 105,127 105,127 105,127 105,127 105,127 105,127 105,127 105,127 105,127 105,127
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 161,335 161,335 161,335 161,335 161,335 161,335 161,335 161,335 161,335 161,335
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 259,140 259,140 259,140 259,140 259,140 259,140 259,140 259,140 259,140 259,140
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 376,247 376,247 376,247 376,247 376,247 376,247 376,247 376,247 376,247 376,247
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 476,032 476,032 476,032 476,032 476,032 476,032 476,032 476,032 476,032 476,032
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 625,880 625,880 625,880 625,880 625,880 625,880 625,880 625,880 625,880 625,880
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 860,593 860,593 860,593 860,593 860,593 860,593 860,593 860,593 860,593 860,593

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 REFUERZO)
UN ### 703,380 708,810 692,066 707,453 712,431 697,310 707,453 702,022 695,687 710,922

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.


4.2 PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML ### 664,941 664,941 664,941 664,941 664,941 661,733 664,941 664,941 664,941 666,371

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON


4.3 REFUERZO (INCLUYE ARO Y TAPA HF)
UN ### 744,252 747,873 736,710 746,967 750,286 740,205 746,967 743,347 739,123 749,281

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI


4.4 CON REFUERZO)
UN ### 834,994 841,782 820,852 840,085 846,307 827,406 840,085 833,296 825,377 844,422

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.


4.5 PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML ### 942,018 942,018 942,018 942,018 942,018 937,501 942,018 942,018 942,018 944,032

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON


4.6 REFUERZO (INCLUYE ARO Y TAPA HF)
UN ### 859,955 864,933 849,584 863,688 868,252 854,391 863,688 858,710 852,903 866,869
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,039,758 1,041,025 1,037,118 1,040,709 1,041,870 1,037,134 1,040,709 1,039,441 1,037,963 1,042,045
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,509,193 1,514,443 1,498,256 1,513,130 1,517,942 1,501,723 1,513,130 1,507,880 1,501,756 1,517,407
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,069,014 2,082,474 2,040,972 2,079,109 2,091,447 2,056,295 2,079,109 2,065,649 2,049,945 2,088,044
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,752,801 2,775,174 2,706,191 2,769,582 2,790,089 2,731,663 2,769,582 2,747,208 2,721,106 2,784,434
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,891,635 1,891,635 1,891,635 1,891,635 1,891,635 1,891,635 1,891,635 1,891,635 1,891,635 1,891,635
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 3,994,124 3,994,124 3,994,124 3,994,124 3,994,124 3,994,124 3,994,124 3,994,124 3,994,124 3,994,124
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ### 144,202 144,202 144,202 144,202 144,202 144,072 144,202 144,202 144,202 144,261
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
p
5 ANDENES Y SARDINELES i
o
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 75,301 75,301 75,301 75,301 75,301 74,804 75,301 75,301 75,301 75,458
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 89,185 89,185 89,185 89,185 89,185 88,688 89,185 89,185 89,185 89,342
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 58,810 59,624 57,113 59,421 60,167 58,292 59,421 58,606 57,656 59,998
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 64,420 65,370 62,440 65,132 66,004 63,357 65,132 64,182 63,073 65,740
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 64,217 65,077 62,426 64,862 65,650 63,409 64,862 64,002 62,999 65,434
5.6 BORDE SEPARADOR VERDE A-170 ML ### 260,460 260,460 260,460 260,460 260,460 260,329 260,460 260,460 260,460 260,519
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,443 19,541 19,239 19,516 19,606 19,381 19,516 19,418 19,304 19,585
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 42,124 42,698 40,928 42,554 43,081 41,759 42,554 41,980 41,310 42,961
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 86,079 86,079 86,079 86,079 86,079 86,009 86,079 86,079 86,079 86,110
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 577,254 578,307 575,061 578,043 579,008 573,817 578,043 576,991 575,762 579,124
5.11 LOSETA PREFABRICADA A-40 M2 ### 64,007 64,007 64,007 64,007 64,007 63,707 64,007 64,007 64,007 64,140
5.12 LOSETA PREFABRICADA A-60 M2 ### 92,703 92,703 92,703 92,703 92,703 92,404 92,703 92,703 92,703 92,837
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML ### 35,377 35,757 34,585 35,662 36,010 34,952 35,662 35,282 34,838 35,905

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML ### 57,023 57,792 55,420 57,600 58,305 56,163 57,600 56,830 55,933 58,091
5.15 SARDINEL PREFABRICADO A-10 ML ### 99,473 108,229 97,483 106,836 103,453 103,383 108,627 107,035 105,045 100,945
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 61,885 61,885 61,885 61,885 61,885 61,703 61,885 61,885 61,885 61,965

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 210,053 210,506 209,110 210,393 210,807 209,547 210,393 209,940 209,412 210,682
6.2 BANCA EN CONCRETO M-30 UN ### 686,137 686,771 684,817 686,613 687,193 685,429 686,613 685,979 685,240 687,017
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 221,669 221,759 221,480 221,736 221,819 221,578 221,736 221,646 221,540 221,796
6.4 BOLARDO M-60 CONCRETO UN ### 168,378 168,921 167,246 168,785 169,283 167,771 168,785 168,242 167,608 169,132
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 170,357 170,900 169,226 170,765 171,263 169,750 170,765 170,222 169,588 171,112
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 199,118 199,661 197,987 199,526 200,023 198,577 199,526 198,983 198,349 199,882
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 60,764 60,764 60,764 60,764 60,764 60,384 60,764 60,764 60,764 60,885
6.8 BORDILLO PREFABRICADO A-80 ML ### 69,532 69,532 69,532 69,532 69,532 69,106 69,532 69,532 69,532 69,667
6.9 CANECA M-120 UN ### 320,188 320,188 320,188 320,188 320,188 320,093 320,188 320,188 320,188 320,218
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 845,644 845,916 845,079 845,848 846,097 845,341 845,848 845,576 845,260 846,021
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,460,777 3,460,958 3,460,400 3,460,913 3,461,079 3,460,574 3,460,913 3,460,732 3,460,520 3,461,028
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,560,054 3,560,235 3,559,677 3,560,190 3,560,356 3,559,851 3,560,190 3,560,009 3,559,797 3,560,305
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 498,371 498,552 497,994 498,507 498,673 498,191 498,507 498,326 498,115 498,626
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 660,997 661,721 659,489 661,540 662,204 660,275 661,540 660,816 659,972 662,016
6.15 BANCA EN MADERA M-50 UN ### 548,483 548,483 548,483 548,483 548,483 548,483 548,483 548,483 548,483 548,483
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 256,202 256,474 255,636 256,406 256,655 255,899 256,406 256,134 255,817 256,579
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 589,567 589,567 589,567 589,567 589,567 589,329 589,567 589,567 589,567 589,642
6.18 POSTE HISTÓRICO M-131 UN ### 6,578,745 6,580,103 6,575,917 6,579,763 6,581,008 6,577,227 6,579,763 6,578,405 6,576,822 6,580,631

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,133 4,133 4,133 4,133 4,133 4,133 4,133 4,133 4,133 4,133
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,592 44,592 44,592 44,592 44,592 44,592 44,592 44,592 44,592 44,592
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 321,811 321,811 321,811 321,811 321,811 321,745 321,811 321,811 321,811 321,840
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 507,571 507,933 506,817 507,842 508,174 507,210 507,842 507,480 507,058 508,080
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 241,273 241,273 241,273 241,273 241,273 241,207 241,273 241,273 241,273 241,302
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 256,168 256,168 256,168 256,168 256,168 256,102 256,168 256,168 256,168 256,197
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 267,447 267,447 267,447 267,447 267,447 267,381 267,447 267,447 267,447 267,476
7.8 TACHAS REFLECTIVAS UN ### 13,908 13,908 13,908 13,908 13,908 13,908 13,908 13,908 13,908 13,908
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### 14,848 14,848 14,848 14,848 14,848 14,848 14,848 14,848 14,848 14,848
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 SUMINISTRO E INSTALACIÓN)
UN ### 120,760 120,760 120,760 120,760 120,760 120,760 120,760 120,760 120,760 120,760
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
p
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
i
1 NORMA INV PRELIMILARES o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO
1.1 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE


1.2 201 P SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE


1.3 200.1 SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y


1.4 200.2 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE


1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,


1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS
M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 ### 36,041 36,041 36,041 36,041 36,041 36,041 36,041 36,041 36,041 36,041

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES


2.3 210.2.2 Y PRÉSTAMOS M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002

2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXIST M2 ### 494 494 494 494 494 494 494 494 494 494

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE


2.8 230.2 MATERIAL ADICIONADO
M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE


2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 66,466 66,466 66,466 66,466 66,466 66,466 66,466 66,466 66,466 66,466

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE


2.11 600.3 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 81,633 81,633 81,633 81,633 81,633 81,633 81,633 81,633 81,633 81,633

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO


2.12 600.4 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO


2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE


2.14 600.5 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO


2.15 600.5 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 140,512 191,482 113,077 179,179 158,088 149,300 194,998 174,593 163,361 131,724
3.3 330.1 BASE GRANULAR M3 ### 137,503 214,837 119,927 202,534 172,655 172,655 218,352 204,291 186,715 149,188

EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE


3.4 365.1 (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km) M3 ### 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132

3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,584 3,584 3,584 3,584 3,584 3,584 3,584 3,584 3,584 3,584
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### p 1,223 1,223 1,223 1,223 1,223 1,223 1,223 1,223 1,223 1,223
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
i
3.7 461.1 ASFÁLTICA
M3 ### o 250,630 253,262 245,147 252,604 255,016 245,693 252,604 249,972 246,902 253,998

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 67,319 67,409 67,130 67,387 67,469 66,851 67,387 67,296 67,190 67,614
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO)
M3 ### 620,297 618,607 598,327 621,987 662,547 643,957 686,207 594,947 660,857 606,777

MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO


3.10 450.2 P ASFÁLTICO) M3 ### 626,438 624,748 604,468 628,128 668,688 650,098 692,348 601,088 666,998 612,918

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO


3.11 450.9 P ASFÁLTICO) M3 ### 666,427 664,737 644,457 668,117 708,677 690,087 732,337 641,077 706,987 652,907

MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO


3.12 450.3 P ASFÁLTICO)
M3 ### 657,143 655,453 635,173 658,833 699,393 680,803 723,053 631,793 697,703 643,623

3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### 358,647 334,704 343,483 351,012 362,324 373,928 323,486 396,583 381,918 353,364
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 304,966 382,300 287,390 369,997 340,118 340,118 385,815 371,754 354,178 316,651
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 306,276 357,247 278,841 344,944 323,852 315,064 360,762 340,357 329,125 297,488
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 39,441 39,441 39,441 39,441 39,441 39,441 39,441 39,441 39,441 39,441

3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 174,780 174,780 174,780 174,780 174,780 174,780 174,780 174,780 174,780 174,780
3.15 311.1 AFIRMADO M3 ### 107,548 116,336 81,184 104,032 125,124 125,124 133,912 123,366 107,548 100,621
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 12,978 13,188 12,539 13,135 13,328 12,539 13,135 12,925 12,679 13,241
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 5,293 5,398 5,074 5,372 5,468 5,074 5,372 5,267 5,144 5,425
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 662,850 670,069 647,810 668,264 674,882 658,266 668,264 661,045 652,622 673,378

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE


3.19 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 695,931 703,474 680,217 701,588 708,502 691,142 701,588 694,045 685,246 706,931

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE


3.20 500.1 JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 717,356 725,006 701,418 723,093 730,106 712,810 723,093 715,443 706,518 728,558

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE


3.21 *** LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE) ML ### 7,357 7,357 7,357 7,357 7,357 7,357 7,357 7,357 7,357 7,357
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 97,826 160,288 97,826 160,288 135,006 135,006 142,442 133,518 120,134 115,148

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 951,165 959,354 934,104 957,306 964,813 945,965 957,306 949,117 939,563 963,107
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 818,323 826,376 801,545 824,363 831,745 813,210 824,363 816,309 806,914 830,068
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 867,139 875,511 849,696 873,418 881,092 861,823 873,418 865,045 855,278 879,348
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 597,450 605,721 580,219 603,653 611,234 589,676 603,653 595,382 585,733 609,150
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 698,665 707,263 680,752 705,114 712,995 690,583 705,114 696,516 686,484 710,828
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 599,396 608,538 580,352 606,252 614,632 589,178 606,252 597,111 586,446 612,093
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 700,688 710,192 680,889 707,816 716,528 690,065 707,816 698,312 687,225 713,888
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 764,967 774,109 745,923 771,823 780,203 754,749 771,823 762,681 752,017 777,664
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 619,981 629,485 600,182 627,109 635,820 609,358 627,109 617,605 606,518 633,181
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 811,669 821,173 791,871 818,797 827,509 801,047 818,797 809,293 798,206 824,869
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE
4.11 650 P DE ACERO A-36
KG ### 12,331 12,331 12,331 12,331 12,331 12,331 12,331 12,331 12,331 12,331

SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE


4.12 650 P DE ACERO A-588 GRADO B
KG ### 15,766 15,766 15,766 15,766 15,766 15,766 15,766 15,766 15,766 15,766
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,852 1,852 1,852 1,852 1,852 1,852 1,852 1,852 1,852 1,852

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,


4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,755,854 2,755,854 2,755,854 2,755,854 2,755,854 2,755,854 2,755,854 2,755,854 2,755,854 2,755,854

PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M.


4.15 621.1 P CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER ML ### 4,288,957 4,302,965 4,259,775 4,299,463 4,312,303 4,280,063 4,299,463 4,285,455 4,269,113 4,309,386
TIPO DE MATERIAL, REFUERZO Y ANILLOS)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE p
4.16 621.2 M3 ### 1,789,844 1,798,895 1,770,988 1,796,632 1,804,929 1,779,727 1,796,632 1,787,581 1,777,022 1,802,415
REFUERZO) i
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ### o
U(DM3) 89,655 89,655 89,655 89,655 89,655 89,655 89,655 89,655 89,655 89,655
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 373,581 374,667 371,318 374,395 375,391 372,367 374,395 373,309 372,042 375,089
4.19 632 P BARANDA METÁLICA ML ### 436,944 436,944 436,944 436,944 436,944 436,944 436,944 436,944 436,944 436,944
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,447 17,447 17,447 17,447 17,447 17,447 17,447 17,447 17,447 17,447
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 ### 522,713 536,112 489,842 526,543 546,847 528,455 544,931 530,450 511,393 530,104
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 130,463 173,592 130,463 207,798 163,182 178,152 182,515 152,771 166,156 137,899
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 115,168 123,280 90,832 111,923 131,392 131,392 122,586 129,076 130,698 116,140
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 403,782 412,923 384,737 410,637 419,017 394,666 410,637 401,496 390,830 416,637
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 ### 384,463 412,607 373,149 411,249 407,034 392,568 404,760 396,084 384,881 398,399
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.26 630.7 ELEVACIONES
M3 ### 393,134 421,278 381,820 419,920 415,705 401,239 413,431 404,755 393,552 407,070
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 395,019 422,388 385,322 421,224 416,297 405,584 414,735 406,835 396,537 408,107
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 403,690 431,059 393,993 429,895 424,968 414,255 423,406 415,506 405,208 416,778
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 539,635 547,471 523,312 545,513 552,695 534,660 545,513 537,677 528,536 551,063
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 638,790 646,936 621,820 644,900 652,367 633,618 644,900 636,754 627,251 650,670
4.31 681.1 GAVIÓN M3 ### 189,159 248,782 189,159 248,782 224,649 224,649 231,747 223,229 210,453 205,694
4.32 681.1 GAVIÓN MALLA PVC M3 ### 193,410 253,033 193,410 253,033 228,900 228,900 235,998 227,481 214,704 209,946
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4.33 672.1 2500 PSI
ML ### 44,290 44,771 43,288 44,651 45,092 43,985 44,651 44,170 43,609 44,992

BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE


4.34 672.1 E, 2500 PSI
ML ### 17,001 17,241 16,500 17,181 17,402 16,848 17,181 16,941 16,660 17,352

SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO


4.35 *** (RESISTENCIA ÚLTIMA 25 KN)
M2 ### 10,424 10,424 10,424 10,424 10,424 10,424 10,424 10,424 10,424 10,424

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 ### 14,813 14,813 14,813 14,813 14,813 14,813 14,813 14,813 14,813 14,813

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 ### 19,897 19,897 19,897 19,897 19,897 19,897 19,897 19,897 19,897 19,897
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN) M2 ### 23,828 23,828 23,828 23,828 23,828 23,828 23,828 23,828 23,828 23,828

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE


4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN) M2 ### 30,587 30,587 30,587 30,587 30,587 30,587 30,587 30,587 30,587 30,587

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800


4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482 7,482

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,513 8,513 8,513 8,513 8,513 8,513 8,513 8,513 8,513 8,513

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 8,846 8,846 8,846 8,846 8,846 8,846 8,846 8,846 8,846 8,846
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700
4.43 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 6,326 6,326 6,326 6,326 6,326 6,326 6,326 6,326 6,326 6,326
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100
4.44 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 9,485 9,485 9,485 9,485 9,485 9,485 9,485 9,485 9,485 9,485
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400
4.45 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 7,750 7,750 7,750 7,750 7,750 7,750 7,750 7,750 7,750 7,750
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400
4.46 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 9,485 9,485 9,485 9,485 9,485 9,485 9,485 9,485 9,485 9,485

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000


4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 18,146 18,146 18,146 18,146 18,146 18,146 18,146 18,146 18,146 18,146

SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO


4.48 661.1 Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### 645,974 645,974 645,974 645,974 645,974 646,290 645,974 645,974 645,974 646,020

SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,


4.49 660.3 DIÁMETRO 600 MM
ML ### 371,811 373,621 368,039 373,168 374,828 369,875 373,168 371,358 369,246 374,415
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
PROVINCIA: TEQUENDAMA
u
ESTOS PRECIOS CONTEMPLAN
n SUMINISTRO, INSTALACIÓN Y TRANSPORTE
i
San_Ant_Teque
ÍTEM DESCRIPCIÓN UNIDAD cAnapoima Anolaima Apulo Cachipay El_Colegio La_Mesa Quipile ndama Tena Viotá
i
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, p
4.50 *** DIÁMETRO 36"
ML ### i 903,542 903,542 903,542 903,542 903,542 903,542 903,542 903,542 903,542 903,542
o
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 177,429 185,879 152,079 174,049 194,329 194,329 202,779 192,639 177,429 170,769

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000


4.52 640.1 PSI
KG ### 4,546 4,546 4,546 4,546 4,546 4,546 4,546 4,546 4,546 4,546

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E


4.53 *** INSTALACIÓN) ML ### 87,879 87,879 87,879 87,879 87,879 87,879 87,879 87,879 87,879 87,879

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E


4.54 *** INSTALACIÓN) ML ### 133,861 133,861 133,861 133,861 133,861 133,861 133,861 133,861 133,861 133,861
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 546,114 554,260 529,144 552,224 559,691 540,942 552,224 544,078 534,575 557,994
4.56 682.1 P COLCHONETA RENO M3 ### 205,866 265,489 205,866 265,489 241,356 241,356 248,454 239,936 227,160 222,401
4.57 *** TRINCHO EN MADERA M2 ### 69,609 69,609 69,609 69,609 69,609 69,609 69,609 69,609 69,609 69,609

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,133 4,133 4,133 4,133 4,133 4,133 4,133 4,133 4,133 4,133
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 44,592 44,592 44,592 44,592 44,592 44,592 44,592 44,592 44,592 44,592
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 85,744 85,744 85,744 85,744 85,744 85,744 85,744 85,744 85,744 85,744
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 71,370 71,370 71,370 71,370 71,370 71,370 71,370 71,370 71,370 71,370
5.5 730.1 DEFENSA METÁLICA ML ### 152,239 152,660 151,362 152,555 152,941 151,830 152,555 152,134 151,642 152,833
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES UN ### 13,908 13,908 13,908 13,908 13,908 13,908 13,908 13,908 13,908 13,908

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 862 862 862 862 862 862 862 862 862 862
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
6.2 801.6 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847
A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN


6.3 801.7 DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM
ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067

6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5
6.5 801.1 KM)
HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE


6.6 801.4 SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,407 15,407 15,407 15,407 15,407 15,407 15,407 15,407 15,407 15,407
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 24,912 24,912 24,912 24,912 24,912 24,912 24,912 24,912 24,912 24,912
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,475 9,475 9,475 9,475 9,475 9,475 9,475 9,475 9,475 9,475

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
p CONSTRUCCIÓN
1 PRELIMINARES i
1.1 CAMPAMENTO 18 M2 UN ### o 2,087,601 2,084,628 2,092,806 2,103,212 2,092,061 2,107,673 2,100,982 2,083,885 2,092,806 2,078,680
1.2 CAMPAMENTO 9 M2 UN ### 1,219,856 1,218,370 1,222,459 1,227,662 1,222,087 1,229,892 1,226,547 1,217,998 1,222,459 1,215,396
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML ### 14,926 14,926 14,926 14,926 14,926 14,926 14,926 14,926 14,926 14,926
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML ### 16,732 16,732 16,732 16,732 16,732 16,732 16,732 16,732 16,732 16,732
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML ### 19,354 19,354 19,354 19,354 19,354 19,354 19,354 19,354 19,354 19,354
1.6 CERCA EN TABLA H=2.30 M ML ### 69,095 69,095 69,095 69,095 69,095 69,095 69,095 69,095 69,095 69,095
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML ### 48,352 48,320 48,409 48,522 48,401 48,571 48,498 48,312 48,409 48,255
1.8 CERCA EN TELA VERDE H = 2.10 M ML ### 22,330 22,298 22,387 22,500 22,379 22,549 22,476 22,290 22,387 22,233
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 ### 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798 84,798
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 ### 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627 6,627
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 ### 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394 9,394
1.12 DEMOLICIÓN ENCHAPE MURO M2 ### 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201 7,201
1.13 DEMOLICIÓN PAÑETE MURO M2 ### 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823 7,823
1.14 DEMOLICIÓN CIELO RASO FALSO M2 ### 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450 9,450
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 ### 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507 9,507
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 ### 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186 14,186
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 ### 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379 19,379
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 ### 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829 28,829
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 ### 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947 41,947
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 ### 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916 51,916
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 ### 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133 43,133
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 ### 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586 60,586
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 ### 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737 71,737
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 ### 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925 87,925
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 ### 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606 9,606
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 ### 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534 15,534
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 ### 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646 23,646
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 ### 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779 38,779
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 ### 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506 244,506
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 ### 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579 1,579
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 ### 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130 6,130
1.32 DESMONTE APARATOS SANITARIOS UN ### 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010 22,010
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 ### 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 ### 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005 11,005
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 ### 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288 10,288
1.37 DESMONTE MUROS SECOS M2 ### 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304 16,304
1.38 DESMONTE MARCOS Y PUERTAS UN ### 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116 14,116
1.39 DESMONTE VENTANAS M2 ### 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042 12,042
1.40 LETRINA DE 2.0x1.0 UN ### 947,270 946,349 947,637 949,965 948,253 950,948 950,020 945,870 946,841 945,303
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS
1.41 DE PRESICIÓN
M2 ### 10,850 10,850 10,850 10,850 10,850 10,850 10,850 10,850 10,850 10,850
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 ### 3,951 3,951 3,951 3,951 3,951 3,951 3,951 3,951 3,951 3,951
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN ### 2,824,779 2,824,779 2,824,779 2,824,779 2,824,779 2,824,779 2,824,779 2,824,779 2,824,779 2,824,779
1.44 RED TELEFÓNICA PROVISIONAL UN ### 261,664 261,664 261,664 261,664 261,664 261,664 261,664 261,664 261,664 261,664
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE
1.45 CARGUE)
M3 ### 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427 9,427

2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 ### 93,890 82,536 89,567 110,658 101,870 119,446 115,931 75,506 75,506 75,506
2.2 BASE ARENA CEMENTO 1:20 M3 ### 210,343 206,798 216,550 228,961 215,663 234,281 226,301 205,911 216,550 199,704
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 ### 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966 311,966
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 ### i 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047 217,047
p
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 ### i 23,311 23,311 23,311 23,311 23,311 23,311 23,311 23,311 23,311 23,311
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 ### o 652,407 649,232 657,966 669,083 657,172 673,847 666,700 648,437 657,966 642,879
2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 ### 654,197 650,903 659,965 671,497 659,141 676,441 669,025 650,079 659,965 644,312
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 ### 609,272 606,187 614,672 625,471 613,901 630,099 623,156 605,415 614,672 600,015
2.9 PILOTE DE MADERA D=20 CM ML ### 51,269 51,269 51,269 51,269 51,269 51,269 51,269 51,269 51,269 51,269
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE
2.10 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 158,355 158,355 158,355 158,355 158,355 158,355 158,355 158,355 158,355 158,355

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE


2.11 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 198,139 198,139 198,139 198,139 198,139 198,139 198,139 198,139 198,139 198,139

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE


2.12 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 246,250 246,250 246,250 246,250 246,250 246,250 246,250 246,250 246,250 246,250

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE


2.13 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
ML ### 311,015 311,015 311,015 311,015 311,015 311,015 311,015 311,015 311,015 311,015
2.14 PILOTE HINCADO 25X25 ML ### 107,724 107,499 108,117 108,905 108,061 109,242 108,736 107,443 108,117 107,049
2.15 PILOTE HINCADO 30X30 ML ### 132,832 132,506 133,402 134,543 133,321 135,032 134,299 132,424 133,402 131,854
2.16 DADOS EN CONCRETO 3500PSI M3 ### 594,274 591,189 599,674 610,472 598,902 615,101 608,158 590,417 599,674 585,017
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA
2.17 DISTANCIA MENOR DE 5 KM)
ML ### 94,919 94,919 94,919 94,919 94,919 94,919 94,919 94,919 94,919 94,919

3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS


3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN ### 40,448 40,426 40,486 40,564 40,481 40,597 40,547 40,420 40,486 40,382
3.2 SIFÓN EN PVC 6" UN ### 208,340 208,318 208,378 208,455 208,373 208,488 208,439 208,312 208,378 208,274
3.3 CAJA DE INSPECCIÓN DE 100X100 UN ### 469,392 463,211 469,886 484,087 475,360 490,056 485,645 459,601 463,279 457,455
3.4 CAJA DE INSPECCIÓN DE 40X40 UN ### 235,244 234,436 235,787 237,988 236,177 238,921 237,904 234,060 235,230 233,377
3.5 CAJA DE INSPECCIÓN DE 60X60 UN ### 266,868 265,565 267,781 271,358 268,386 272,875 271,201 264,966 266,906 263,834
3.6 CAJA DE INSPECCIÓN DE 80X80 UN ### 349,185 347,429 350,889 356,049 351,381 358,245 355,553 346,717 350,014 344,793
3.7 DUCTO ELÉCTRICO PVC 4" ML ### 110,644 110,585 110,625 110,744 110,694 110,794 110,774 110,545 110,545 110,545
3.8 POZO SÉPTICO ETERNIT 1000 LT UN ### 1,348,972 1,348,375 1,348,773 1,349,967 1,349,470 1,350,465 1,350,266 1,347,977 1,347,977 1,347,977
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML ### 121,890 121,647 122,316 123,168 122,255 123,533 122,985 121,586 122,316 121,160
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML ### 76,798 76,670 77,023 77,472 76,991 77,665 77,376 76,638 77,023 76,413
3.11 TUBERÍA DRENAJE PVC 110 ML ### 29,061 29,006 29,157 29,350 29,143 29,432 29,308 28,992 29,157 28,895
3.12 TUBERÍA DRENAJE PVC 160 ML ### 46,946 46,890 47,042 47,235 47,028 47,317 47,193 46,877 47,042 46,780
3.13 TUBERÍA DRENAJE PVC 200 ML ### 61,546 61,469 61,681 61,951 61,662 62,066 61,893 61,450 61,681 61,315
3.14 TUBERÍA DRENAJE PVC 250 ML ### 84,287 84,199 84,442 84,750 84,420 84,882 84,684 84,177 84,442 84,023
3.15 TUBERÍA DRENAJE PVC 315 ML ### 116,817 116,740 116,952 117,222 116,933 117,337 117,164 116,721 116,952 116,586
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE
3.16 MATERIAL FILTRANTE)
UN ### 1,001,450 1,000,569 1,002,992 1,006,075 1,002,771 1,007,397 1,005,414 1,000,348 1,002,992 998,806
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE
3.17 MATERIAL FILTRANTE) UN ### 1,412,046 1,410,285 1,415,130 1,421,297 1,414,689 1,423,941 1,419,976 1,409,844 1,415,130 1,406,760
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE
3.18 MATERIAL FILTRANTE)
UN ### 1,831,452 1,827,929 1,837,620 1,849,955 1,836,739 1,855,241 1,847,312 1,827,048 1,837,620 1,820,880

4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 ### 44,478 44,478 44,478 44,478 44,478 44,478 44,478 44,478 44,478 44,478
4.2 CASETÓN DE LONA 0.80X0.70 M2 ### 58,676 58,676 58,676 58,676 58,676 58,676 58,676 58,676 58,676 58,676
4.3 COLUMNAS 3500 PSI M3 ### 826,499 823,414 831,899 842,698 831,128 847,327 840,383 822,643 831,899 817,242
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 ### 245,478 246,905 251,757 267,658 256,292 263,010 255,355 246,426 255,100 240,147
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL.
4.5 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2 ### 101,414 101,115 101,938 102,987 101,864 103,436 102,762 101,040 101,938 100,515

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL.


4.6 MALLA DE REFUERZO, CONCRETO DE 3500 PSI
M2 ### 119,517 119,158 120,147 121,405 120,057 121,944 121,135 119,068 120,147 118,439

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN


4.7 REFUERZO)
M2 ### 132,938 132,459 133,777 135,454 133,657 136,173 135,095 132,339 133,777 131,500

ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN


4.8 REFUERZO)
M2 ### 140,232 139,723 141,124 142,906 140,996 143,670 142,524 139,596 141,124 138,705
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN p
4.9 REFUERZO)
M2 ### 160,288 159,659 161,389 163,591 161,232 164,535 163,119 159,502 161,389 158,401
i
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN o
4.10 REFUERZO)
M2 ### 178,122 177,403 179,381 181,897 179,201 182,975 181,357 177,224 179,381 175,965

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN


4.11 REFUERZO)
M2 ### 197,612 196,803 199,027 201,858 198,825 203,071 201,251 196,601 199,027 195,185
4.12 ENTREPISO VIGUETA PLACA M2 ### 104,510 104,459 104,600 104,781 104,588 104,858 104,742 104,446 104,600 104,355
4.13 ESCALERA MACIZA 3500 PSI M3 ### 982,889 979,804 988,289 999,088 987,518 1,003,717 996,774 979,033 988,289 973,633
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 ### 100,091 100,047 100,168 100,323 100,157 100,389 100,289 100,036 100,168 99,959
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 ### 81,016 80,708 81,557 82,636 81,479 83,099 82,405 80,631 81,557 80,091
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 ### 90,916 90,539 91,577 92,898 91,483 93,464 92,615 90,445 91,577 89,784
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 ### 105,661 105,188 106,489 108,146 106,371 108,856 107,791 105,069 106,489 104,241
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 ### 721,025 717,940 726,425 737,224 725,654 741,853 734,910 717,169 726,425 711,769
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI
4.19000000000001 (ANCHO 1 M)
UN ### 51,493 51,398 51,659 51,992 51,636 52,135 51,921 51,374 51,659 51,207

4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 ### 285,007 283,629 287,419 292,241 287,074 294,308 291,208 283,285 287,419 280,873
4.21000000000001 ACERO FIGURADO 37000 PSI KG ### 4,412 4,412 4,412 4,412 4,412 4,412 4,412 4,412 4,412 4,412
4.22 ACERO FIGURADO 60000 PSI KG ### 4,627 4,627 4,627 4,627 4,627 4,627 4,627 4,627 4,627 4,627
4.23000000000001 REFUERZO MALLA ELECTROSOLDADA KG ### 6,508 6,508 6,508 6,508 6,508 6,508 6,508 6,508 6,508 6,508
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 ### 876,729 873,644 882,129 892,928 881,358 897,557 890,613 872,873 882,129 867,472
4.25000000000001 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 ### 793,577 790,201 799,488 811,306 798,643 816,372 808,773 789,357 799,488 783,446
4.26 VIGA AÉREA 3500 PSI M3 ### 867,891 864,807 873,292 884,090 872,520 888,719 881,776 864,035 873,292 858,635
4.27000000000001 VIGA CINTA 3500 PSI M3 ### 846,602 843,518 852,003 862,801 851,231 867,430 860,487 842,746 852,003 837,346
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 ### 1,069,617 1,066,532 1,075,017 1,085,816 1,074,246 1,090,445 1,083,501 1,065,761 1,075,017 1,060,360
4.29000000000001 BASE EN CONCRETO POBRE 1500 PSI M3 ### 312,853 309,451 318,809 330,719 317,957 335,824 328,167 308,600 318,809 302,643

5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML ### 30,964 30,879 31,114 31,413 31,092 31,541 31,349 30,857 31,114 30,708
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML ### 52,558 52,473 52,708 53,007 52,686 53,135 52,943 52,451 52,708 52,302
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML ### 37,104 37,082 37,142 37,219 37,137 37,252 37,203 37,076 37,142 37,037
5.4 ARCOS EN LADRILLO PRENSADO ML ### 173,583 173,539 173,660 173,814 173,649 173,880 173,781 173,528 173,660 173,451
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML ### 45,976 45,881 46,143 46,476 46,119 46,619 46,405 45,858 46,143 45,691
5.6 DINTELES EN BLOQUE 0.15 M ML ### 28,455 28,411 28,533 28,687 28,522 28,753 28,654 28,400 28,533 28,323
5.7 ENCHAPES LADRILLO PRENSADO M2 ### 104,675 104,587 104,829 105,138 104,807 105,270 105,071 104,565 104,829 104,411
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 ### 93,570 93,252 94,125 95,235 94,045 95,711 94,997 93,173 94,125 92,618
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 ### 96,611 96,611 96,611 96,611 96,611 96,611 96,611 96,611 96,611 96,611
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML ### 56,704 56,704 56,704 56,704 56,704 56,704 56,704 56,704 56,704 56,704
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 ### 93,055 93,055 93,055 93,055 93,055 93,055 93,055 93,055 93,055 93,055
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML ### 54,927 54,927 54,927 54,927 54,927 54,927 54,927 54,927 54,927 54,927
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 ### 107,801 107,801 107,801 107,801 107,801 107,801 107,801 107,801 107,801 107,801
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML ### 63,700 63,700 63,700 63,700 63,700 63,700 63,700 63,700 63,700 63,700
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 ### 119,867 119,867 119,867 119,867 119,867 119,867 119,867 119,867 119,867 119,867
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML ### 69,733 69,733 69,733 69,733 69,733 69,733 69,733 69,733 69,733 69,733
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 ### 43,094 43,049 43,171 43,326 43,160 43,392 43,293 43,038 43,171 42,961
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML ### 26,119 26,097 26,158 26,236 26,153 26,269 26,219 26,092 26,158 26,053
5.19000000000001 MURO EN BLOQUE DE CONCRETO 0.10 M M2 ### 56,070 56,041 56,122 56,225 56,115 56,269 56,203 56,033 56,122 55,982
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML ### 33,737 33,722 33,763 33,815 33,759 33,837 33,804 33,719 33,763 33,693
5.21000000000001 MURO EN BLOQUE DE CONCRETO 0.12 M M2 ### 63,072 63,042 63,123 63,227 63,116 63,271 63,204 63,035 63,123 62,983
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML ### 37,952 37,937 37,978 38,029 37,974 38,051 38,018 37,933 37,978 37,907
5.23000000000001 MURO EN BLOQUE DE CONCRETO 0.20 M M2 ### 104,914 104,766 105,172 105,688 105,135 105,910 105,578 104,729 105,172 104,471
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML ### 62,081 62,007 62,210 62,468 62,191 62,579 62,413 61,988 62,210 61,859
5.25000000000001 MURO EN BLOQUE Nº 4 E= 0.10 M M2 ### 39,507 39,477 39,558 39,662 39,551 39,706 39,639 39,470 39,558 39,418
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML ### 23,973 23,958 23,999 24,050 23,995 24,073 24,039 23,955 23,999 23,929
5.27000000000001 MURO EN BLOQUE Nº 5 E=0.23 M M2 ### 78,532 78,473 78,636 78,842 78,621 78,931 78,798 78,458 78,636 78,355
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML ### i 47,387 47,357 47,439 47,542 47,431 47,586 47,520 47,350 47,439 47,298
p
5.29000000000001 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 ### i 92,734 92,690 92,811 92,965 92,800 93,031 92,932 92,679 92,811 92,602
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML ### o 56,266 56,244 56,304 56,381 56,299 56,414 56,365 56,238 56,304 56,200
5.31000000000001 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 ### 192,408 192,201 192,769 193,492 192,718 193,802 193,337 192,150 192,769 191,788
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML ### 115,701 115,598 115,882 116,244 115,856 116,399 116,166 115,572 115,882 115,392
5.33000000000002 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 ### 94,615 94,529 94,767 95,070 94,745 95,199 95,005 94,507 94,767 94,356
5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML ### 57,206 57,163 57,282 57,434 57,271 57,498 57,401 57,152 57,282 57,077
5.35000000000002 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 ### 49,659 49,593 49,775 50,006 49,758 50,105 49,956 49,576 49,775 49,461
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML ### 30,234 30,201 30,292 30,407 30,284 30,457 30,383 30,193 30,292 30,135
5.37000000000002 MURO TOLETE COMÚN 0.06 M M2 ### 35,805 35,776 35,857 35,960 35,850 36,005 35,938 35,769 35,857 35,717
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML ### 21,831 21,816 21,857 21,908 21,853 21,930 21,897 21,812 21,857 21,787
5.39000000000002 MURO TOLETE COMÚN 0.12 M M2 ### 54,047 53,988 54,151 54,357 54,136 54,446 54,313 53,974 54,151 53,870
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML ### 33,151 33,122 33,203 33,306 33,196 33,351 33,284 33,115 33,203 33,063
5.41000000000002 MURO TOLETE COMÚN 0.25 M M2 ### 104,202 104,114 104,357 104,667 104,335 104,800 104,601 104,092 104,357 103,937
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML ### 63,494 63,450 63,572 63,727 63,561 63,793 63,693 63,439 63,572 63,361
5.43000000000002 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 ### 76,055 75,996 76,158 76,365 76,143 76,453 76,320 75,981 76,158 75,878
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA
5.44 (LINEAL) ML ### 45,956 45,927 46,008 46,111 46,001 46,156 46,089 45,919 46,008 45,868
5.45000000000002 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 ### 159,928 159,721 160,289 161,012 160,238 161,322 160,857 159,669 160,289 159,308
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA
5.46 (LINEAL) ML ### 97,337 97,234 97,518 97,879 97,492 98,034 97,802 97,208 97,518 97,027
5.47000000000002 REMATES LADRILLO PRENSADO ML ### 33,632 33,610 33,670 33,747 33,665 33,780 33,731 33,604 33,670 33,565
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML ### 38,300 38,238 38,409 38,627 38,394 38,720 38,580 38,223 38,409 38,114
5.49000000000003 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML ### 64,772 64,689 64,917 65,207 64,896 65,332 65,145 64,668 64,917 64,523
5.50 LAVADA DE FACHADA M2 ### 5,559 5,559 5,559 5,559 5,559 5,559 5,559 5,559 5,559 5,559
5.51000000000003 PASAMANOS EN CONCRETO 2500 PSI ML ### 52,941 52,855 53,090 53,389 53,069 53,517 53,325 52,834 53,090 52,684
5.52 DOVELA, GROUTING 3000 PSI ML ### 11,184 11,184 11,184 11,184 11,184 11,184 11,184 11,184 11,184 11,184
5.53000000000003 ANCLAJE 3/8" L=30CM UN ### 14,742 14,742 14,742 14,742 14,742 14,742 14,742 14,742 14,742 14,742
5.54 ANCLAJE 1/2" L=50CM UN ### 19,253 19,253 19,253 19,253 19,253 19,253 19,253 19,253 19,253 19,253
5.55000000000003 ANCLAJE 5/8" L=70CM UN ### 26,888 26,888 26,888 26,888 26,888 26,888 26,888 26,888 26,888 26,888
5.56 ANCLAJE 3/4" L=70CM UN ### 40,010 40,010 40,010 40,010 40,010 40,010 40,010 40,010 40,010 40,010
5.57000000000003 ANCLAJE 1" L= 70CM UN ### 5,027 5,004 5,068 5,148 5,062 5,183 5,131 4,999 5,068 4,958

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 ### 17,100 17,100 17,100 17,100 17,100 17,100 17,100 17,100 17,100 17,100
6.2 FILOS O DILATACIONES B/PLACA ML ### 6,108 6,086 6,147 6,224 6,141 6,257 6,207 6,081 6,147 6,042
6.3 FILOS O DILATACIONES S/MURO ML ### 7,365 7,343 7,404 7,481 7,398 7,514 7,464 7,338 7,404 7,299
6.4 GOTERA EN MORTERO 1:4 ML ### 8,713 8,691 8,752 8,829 8,746 8,862 8,812 8,686 8,752 8,647
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 ### 7,217 7,217 7,217 7,217 7,217 7,217 7,217 7,217 7,217 7,217
6.6 MALLA BAJO ENTRAMADO M2 ### 14,494 14,494 14,494 14,494 14,494 14,494 14,494 14,494 14,494 14,494
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 ### 25,505 25,445 25,611 25,823 25,596 25,914 25,778 25,430 25,611 25,324
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML ### 15,502 15,472 15,555 15,661 15,548 15,707 15,639 15,465 15,555 15,412
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 ### 22,397 22,335 22,506 22,722 22,490 22,815 22,676 22,320 22,506 22,211
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML ### 13,619 13,588 13,674 13,782 13,666 13,829 13,759 13,581 13,674 13,526
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 ### 21,381 21,320 21,487 21,699 21,472 21,790 21,653 21,305 21,487 21,199
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML ### 13,111 13,081 13,164 13,270 13,157 13,316 13,248 13,074 13,164 13,021
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 ### 22,397 22,335 22,506 22,722 22,490 22,815 22,676 22,320 22,506 22,211
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML ### 13,619 13,588 13,674 13,782 13,666 13,829 13,759 13,581 13,674 13,526
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 ### 22,690 22,646 22,765 22,916 22,754 22,981 22,884 22,636 22,765 22,560
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML ### 13,765 13,743 13,802 13,878 13,797 13,910 13,862 13,738 13,802 13,700
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 ### 18,636 18,588 18,718 18,884 18,706 18,954 18,848 18,577 18,718 18,494
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML ### 11,433 11,409 11,474 11,557 11,468 11,592 11,539 11,403 11,474 11,362
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
6.19000000000001 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 ### i 17,861 17,815 17,942 18,104 17,931 18,173 18,069 17,804 17,942 17,723
p
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML ### i 11,046 11,023 11,086 11,167 11,080 11,202 11,150 11,017 11,086 10,977
6.21000000000001 PAÑETE LISO PLACAS 1:4, E=2 CM M2 ### o 23,222 23,160 23,330 23,547 23,315 23,640 23,501 23,144 23,330 23,036
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML ### 14,011 13,980 14,065 14,173 14,057 14,220 14,150 13,972 14,065 13,918
6.23000000000001 PAÑETE LISO PLACAS 1:5, E=2 CM M2 ### 22,206 22,145 22,312 22,524 22,297 22,615 22,478 22,130 22,312 22,024
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML ### 13,503 13,472 13,556 13,662 13,548 13,707 13,639 13,465 13,556 13,412
6.25000000000001 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 ### 18,508 18,462 18,589 18,751 18,578 18,820 18,716 18,451 18,589 18,370
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML ### 11,350 11,327 11,391 11,472 11,385 11,506 11,454 11,322 11,391 11,281
6.27000000000001 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 ### 23,149 23,088 23,255 23,467 23,239 23,557 23,421 23,073 23,255 22,967
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML ### 14,403 14,372 14,456 14,561 14,448 14,607 14,539 14,365 14,456 14,312

7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 ### 28,460 28,372 28,615 28,925 28,593 29,058 28,859 28,350 28,615 28,195
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN
7.2 ASFALTO (INCLUYE TELA IMPERMEABLE) M2 ### 86,492 86,334 86,770 87,325 86,730 87,563 87,206 86,294 86,770 86,017
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML ### 58,356 58,356 58,356 58,356 58,356 58,356 58,356 58,356 58,356 58,356
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML ### 23,371 23,371 23,371 23,371 23,371 23,371 23,371 23,371 23,371 23,371
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML ### 36,658 36,658 36,658 36,658 36,658 36,658 36,658 36,658 36,658 36,658
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML ### 85,173 85,173 85,173 85,173 85,173 85,173 85,173 85,173 85,173 85,173
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML ### 66,769 66,769 66,769 66,769 66,769 66,769 66,769 66,769 66,769 66,769
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML ### 38,975 38,975 38,975 38,975 38,975 38,975 38,975 38,975 38,975 38,975
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML ### 89,247 89,247 89,247 89,247 89,247 89,247 89,247 89,247 89,247 89,247
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML ### 106,503 106,503 106,503 106,503 106,503 106,503 106,503 106,503 106,503 106,503
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML ### 156,359 156,359 156,359 156,359 156,359 156,359 156,359 156,359 156,359 156,359
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML ### 62,021 62,021 62,021 62,021 62,021 62,021 62,021 62,021 62,021 62,021
7.13 CANAL PVC AMAZONAS ML ### 86,316 86,316 86,316 86,316 86,316 86,316 86,316 86,316 86,316 86,316
7.14 CANAL PVC RAINGO ML ### 78,534 78,534 78,534 78,534 78,534 78,534 78,534 78,534 78,534 78,534
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 ### 138,793 138,793 138,793 138,793 138,793 138,793 138,793 138,793 138,793 138,793
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 ### 80,979 80,979 80,979 80,979 80,979 80,979 80,979 80,979 80,979 80,979
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 ### 59,559 59,559 59,559 59,559 59,559 59,559 59,559 59,559 59,559 59,559
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML ### 34,209 34,209 34,209 34,209 34,209 34,209 34,209 34,209 34,209 34,209
7.19000000000001 TEJA DE BARRO M2 ### 62,846 62,736 63,039 63,424 63,011 63,589 63,341 62,708 63,039 62,515
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 ### 49,641 49,641 49,641 49,641 49,641 49,641 49,641 49,641 49,641 49,641
7.21000000000001 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 ### 45,527 45,527 45,527 45,527 45,527 45,527 45,527 45,527 45,527 45,527
7.22 TEJA FIBROCEMENTO Nº4 M2 ### 38,616 38,616 38,616 38,616 38,616 38,616 38,616 38,616 38,616 38,616
7.23000000000001 TEJA FIBROCEMENTO No. 6 M2 ### 37,792 37,792 37,792 37,792 37,792 37,792 37,792 37,792 37,792 37,792
7.24 TEJA FIBROCEMENTO No. 8 M2 ### 38,074 38,074 38,074 38,074 38,074 38,074 38,074 38,074 38,074 38,074
7.25000000000001 TEJA TERMOACÚSTICA M2 ### 53,413 53,413 53,413 53,413 53,413 53,413 53,413 53,413 53,413 53,413
7.26 TEJA PLÁSTICA No.6 M2 ### 47,002 47,002 47,002 47,002 47,002 47,002 47,002 47,002 47,002 47,002
7.27000000000001 TEJA ESPAÑOLA ETERNIT M2 ### 85,775 85,775 85,775 85,775 85,775 85,775 85,775 85,775 85,775 85,775
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO
7.28 30MM M2 ### 158,080 158,080 158,080 158,080 158,080 158,080 158,080 158,080 158,080 158,080
7.29000000000001 TEJA SIN TRASLAPO M2 ### 71,180 71,180 71,180 71,180 71,180 71,180 71,180 71,180 71,180 71,180
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 ### 45,127 45,127 45,127 45,127 45,127 45,127 45,127 45,127 45,127 45,127
7.31000000000001 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 ### 35,278 35,278 35,278 35,278 35,278 35,278 35,278 35,278 35,278 35,278
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 ESTRUCTURAL ABIERTO 4"x2", 15 MM)
M2 ### 61,180 61,180 61,180 61,180 61,180 61,180 61,180 61,180 61,180 61,180
7.33000000000002 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML ### 21,240 21,240 21,240 21,240 21,240 21,240 21,240 21,240 21,240 21,240
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML ### 25,482 25,482 25,482 25,482 25,482 25,482 25,482 25,482 25,482 25,482
7.35000000000002 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 ### 27,559 27,559 27,559 27,559 27,559 27,559 27,559 27,559 27,559 27,559
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 ### 35,391 35,391 35,391 35,391 35,391 35,391 35,391 35,391 35,391 35,391
7.37000000000002 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML ### 23,449 23,449 23,449 23,449 23,449 23,449 23,449 23,449 23,449 23,449
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML ### 55,160 55,160 55,160 55,160 55,160 55,160 55,160 55,160 55,160 55,160
7.39000000000002 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 ### 373,895 373,895 373,895 373,895 373,895 373,895 373,895 373,895 373,895 373,895
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 ### 431,736 431,736 431,736 431,736 431,736 431,736 431,736 431,736 431,736 431,736
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
7.41000000000002 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 ### i 285,338 285,338 285,338 285,338 285,338 285,338 285,338 285,338 285,338 285,338
p
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 ### i 304,511 304,511 304,511 304,511 304,511 304,511 304,511 304,511 304,511 304,511
o
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 ### 452,362 449,103 458,067 469,477 457,252 474,367 467,032 448,288 458,067 442,582
8.2 CONCRETO 3500 PSI M3 ### 394,113 391,118 399,356 409,840 398,607 414,334 407,593 390,369 399,356 385,126
8.3 CONCRETO 3000 PSI M3 ### 391,262 388,179 396,659 407,452 395,888 412,077 405,139 387,408 396,659 382,011
8.4 CONCRETO 2500 PSI M3 ### 344,727 341,556 350,278 361,379 349,485 366,137 359,000 340,763 350,278 335,212
8.5 CONCRETO 2000 PSI M3 ### 319,585 316,348 325,252 336,584 324,442 341,441 334,156 315,538 325,252 309,871
8.6 CONCRETO 1500 PSI M3 ### 287,723 284,420 293,506 305,069 292,679 310,025 302,591 283,594 293,506 277,811
8.7 MORTERO SECO 1:10 M3 ### 255,064 252,025 260,384 271,022 259,623 275,581 268,742 251,264 260,384 245,945
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 ### 477,311 474,360 482,477 492,807 481,738 497,234 490,593 473,622 482,477 468,456
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 ### 428,927 426,043 433,973 444,066 433,253 448,392 441,903 425,323 433,973 420,276
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 ### 493,588 490,890 498,307 507,746 497,633 511,792 505,723 490,217 498,307 485,497
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 ### 730,688 727,990 735,407 744,846 734,733 748,892 742,823 727,317 735,407 722,597

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML ### 129,999 129,999 129,999 129,999 129,999 129,999 129,999 129,999 129,999 129,999
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN ### 4,220 4,198 4,258 4,336 4,253 4,369 4,319 4,192 4,258 4,154
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 ### 145,716 145,716 145,716 145,716 145,716 145,716 145,716 145,716 145,716 145,716
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 ### 178,173 178,173 178,173 178,173 178,173 178,173 178,173 178,173 178,173 178,173
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN ### 257,947 257,947 257,947 257,947 257,947 257,947 257,947 257,947 257,947 257,947
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN ### 287,037 287,037 287,037 287,037 287,037 287,037 287,037 287,037 287,037 287,037
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN ### 316,161 316,161 316,161 316,161 316,161 316,161 316,161 316,161 316,161 316,161
9.8 HOJA PUERTA FORTEC 0.81 UN ### 209,812 209,812 209,812 209,812 209,812 209,812 209,812 209,812 209,812 209,812
9.9 HOJA PUERTA FORTEC 0.91 UN ### 237,812 237,812 237,812 237,812 237,812 237,812 237,812 237,812 237,812 237,812
9.10 HOJA PUERTA FORTEC 1.50 UN ### 349,812 349,812 349,812 349,812 349,812 349,812 349,812 349,812 349,812 349,812
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN ### 132,813 132,813 132,813 132,813 132,813 132,813 132,813 132,813 132,813 132,813
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN ### 176,213 176,213 176,213 176,213 176,213 176,213 176,213 176,213 176,213 176,213
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN ### 195,812 195,812 195,812 195,812 195,812 195,812 195,812 195,812 195,812 195,812
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN ### 498,210 498,210 498,210 498,210 498,210 498,210 498,210 498,210 498,210 498,210
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML ### 44,503 44,503 44,503 44,503 44,503 44,503 44,503 44,503 44,503 44,503
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML ### 27,861 27,861 27,861 27,861 27,861 27,861 27,861 27,861 27,861 27,861
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 ### 105,235 105,235 105,235 105,235 105,235 105,235 105,235 105,235 105,235 105,235
9.18 CERRADURA DE ENTRADA PRINCIPAL UN ### 127,542 127,542 127,542 127,542 127,542 127,542 127,542 127,542 127,542 127,542
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN ### 99,122 99,122 99,122 99,122 99,122 99,122 99,122 99,122 99,122 99,122
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN ### 30,859 30,859 30,859 30,859 30,859 30,859 30,859 30,859 30,859 30,859

9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN ### 30,859 30,859 30,859 30,859 30,859 30,859 30,859 30,859 30,859 30,859
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN ### 29,263 29,263 29,263 29,263 29,263 29,263 29,263 29,263 29,263 29,263
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 ### 44,807 44,807 44,807 44,807 44,807 44,807 44,807 44,807 44,807 44,807
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 ### 55,412 55,412 55,412 55,412 55,412 55,412 55,412 55,412 55,412 55,412
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 ### 66,724 66,724 66,724 66,724 66,724 66,724 66,724 66,724 66,724 66,724
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 ### 80,156 80,156 80,156 80,156 80,156 80,156 80,156 80,156 80,156 80,156
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 ### 376,594 376,594 376,594 376,594 376,594 376,594 376,594 376,594 376,594 376,594
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 ### 263,475 263,475 263,475 263,475 263,475 263,475 263,475 263,475 263,475 263,475
9.29 VIDRIO TRANSPARENTE 3 MM M2 ### 35,616 35,616 35,616 35,616 35,616 35,616 35,616 35,616 35,616 35,616
9.30 VIDRIO TRANSPARENTE 4 MM M2 ### 45,514 45,514 45,514 45,514 45,514 45,514 45,514 45,514 45,514 45,514
9.31 VIDRIO TRANSPARENTE 5 MM M2 ### 55,412 55,412 55,412 55,412 55,412 55,412 55,412 55,412 55,412 55,412
9.32 VIDRIO TRANSPARENTE 6 MM M2 ### 69,552 69,552 69,552 69,552 69,552 69,552 69,552 69,552 69,552 69,552

10 CARPINTERÍA METÁLICA
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
10.1 CAJA CONTADOR DE AGUA UN ### i 80,366 80,366 80,366 80,366 80,366 80,366 80,366 80,366 80,366 80,366
p
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 ### i 222,555 222,555 222,555 222,555 222,555 222,555 222,555 222,555 222,555 222,555
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO o
10.3 DE 1" (INCLUYE ANTICORROSIVO)
ML ### 85,240 85,240 85,240 85,240 85,240 85,240 85,240 85,240 85,240 85,240
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN ### 153,093 153,093 153,093 153,093 153,093 153,093 153,093 153,093 153,093 153,093
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN ### 144,355 144,355 144,355 144,355 144,355 144,355 144,355 144,355 144,355 144,355
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 ### 94,786 94,786 94,786 94,786 94,786 94,786 94,786 94,786 94,786 94,786
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 223,096 223,096 223,096 223,096 223,096 223,096 223,096 223,096 223,096 223,096
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 ### 116,381 116,381 116,381 116,381 116,381 116,381 116,381 116,381 116,381 116,381

10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG ### 6,992 6,992 6,992 6,992 6,992 6,992 6,992 6,992 6,992 6,992

CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL


10.10 EN TUBO ESTRUCTURAL GALVANIZADO 2")
M2 ### 105,677 105,677 105,677 105,677 105,677 105,677 105,677 105,677 105,677 105,677

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA


10,10(1) CLASICA) H: 2.00 MTS
M2 ### 127,658 127,658 127,658 127,658 127,658 127,658 127,658 127,658 127,658 127,658

CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC.


10.11 ANTICORROSIVO
ML ### 43,495 43,495 43,495 43,495 43,495 43,495 43,495 43,495 43,495 43,495

DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M,


10.12 E=6MM
M2 ### 567,069 567,069 567,069 567,069 567,069 567,069 567,069 567,069 567,069 567,069
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 ### 204,274 204,274 204,274 204,274 204,274 204,274 204,274 204,274 204,274 204,274

PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA


10.14 ELECTROSTÁTICA
M2 ### 229,857 229,857 229,857 229,857 229,857 229,857 229,857 229,857 229,857 229,857

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20


10.15 (INCLUYE PUERTAS Y ACCESORIOS) M2 ### 517,429 517,429 517,429 517,429 517,429 517,429 517,429 517,429 517,429 517,429

REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC.


10.16 ANTICORROSIVO
M2 ### 136,184 136,184 136,184 136,184 136,184 136,184 136,184 136,184 136,184 136,184
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 ### 413,364 413,364 413,364 413,364 413,364 413,364 413,364 413,364 413,364 413,364
SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC.
10.18 ANTICORROSIVO ML ### 6,384 6,384 6,384 6,384 6,384 6,384 6,384 6,384 6,384 6,384
10.19 VENTANA EN ALUMINIO CORREDIZA M2 ### 291,116 291,116 291,116 291,116 291,116 291,116 291,116 291,116 291,116 291,116
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 ### 129,520 129,520 129,520 129,520 129,520 129,520 129,520 129,520 129,520 129,520
10.21 REJILLA PISO 0.30 M M2 ### 91,049 91,049 91,049 91,049 91,049 91,049 91,049 91,049 91,049 91,049
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN ### 94,078 94,078 94,078 94,078 94,078 94,078 94,078 94,078 94,078 94,078

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:


CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
10.23 AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.
KG ### 11,155 11,155 11,155 11,155 11,155 11,155 11,155 11,155 11,155 11,155
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS
10.24 ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG ### 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369
PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO,
MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR),


PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS,
10.25 TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, KG ### 9,848 9,848 9,848 9,848 9,848 9,848 9,848 9,848 9,848 9,848
TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

11.1 ACOMETIDA EN PVC 1/2" 5M UN ### 234,378 234,378 234,378 234,378 234,378 234,378 234,378 234,378 234,378 234,378
11.2 ACOMETIDA EN PVC 3/4" 5M UN ### 282,149 282,149 282,149 282,149 282,149 282,149 282,149 282,149 282,149 282,149
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML ### 23,371 23,371 23,371 23,371 23,371 23,371 23,371 23,371 23,371 23,371
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML ### i 36,658 36,658 36,658 36,658 36,658 36,658 36,658 36,658 36,658 36,658
p
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML ### i 35,230 35,230 35,230 35,230 35,230 35,230 35,230 35,230 35,230 35,230
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML ### o 45,108 45,108 45,108 45,108 45,108 45,108 45,108 45,108 45,108 45,108
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML ### 92,834 92,834 92,834 92,834 92,834 92,834 92,834 92,834 92,834 92,834
11.8 CONEXIÓN TANQUE ELEVADO PVC UN ### 235,804 235,804 235,804 235,804 235,804 235,804 235,804 235,804 235,804 235,804
11.9 INSTALACIÓN APARATO SANITARIO UN ### 46,933 46,933 46,933 46,933 46,933 46,933 46,933 46,933 46,933 46,933
11.10 INSTALACIÓN BOMBAS AGUA UN ### 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314 653,314
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN ### 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059 1,345,059
11.12 LLAVE MANGUERA UN ### 37,185 37,185 37,185 37,185 37,185 37,185 37,185 37,185 37,185 37,185
11.13 NIPLE PASAMURO 2" UN ### 70,932 70,932 70,932 70,932 70,932 70,932 70,932 70,932 70,932 70,932
11.14 NIPLE PASAMURO 4" UN ### 105,931 105,931 105,931 105,931 105,931 105,931 105,931 105,931 105,931 105,931
11.15 PUNTO AGUA CALIENTE CPVC UN ### 89,197 89,197 89,197 89,197 89,197 89,197 89,197 89,197 89,197 89,197
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN ### 65,343 65,343 65,343 65,343 65,343 65,343 65,343 65,343 65,343 65,343
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN ### 69,441 69,441 69,441 69,441 69,441 69,441 69,441 69,441 69,441 69,441
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN ### 87,733 87,733 87,733 87,733 87,733 87,733 87,733 87,733 87,733 87,733
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN ### 70,533 70,533 70,533 70,533 70,533 70,533 70,533 70,533 70,533 70,533
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN ### 88,024 88,024 88,024 88,024 88,024 88,024 88,024 88,024 88,024 88,024
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN ### 94,084 94,084 94,084 94,084 94,084 94,084 94,084 94,084 94,084 94,084
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN ### 77,729 77,729 77,729 77,729 77,729 77,729 77,729 77,729 77,729 77,729
11.23 RED SUMINISTRO CPVC 1/2" ML ### 13,197 13,197 13,197 13,197 13,197 13,197 13,197 13,197 13,197 13,197
11.24 RED SUMINISTRO CPVC 3/4" ML ### 18,535 18,535 18,535 18,535 18,535 18,535 18,535 18,535 18,535 18,535
11.25 RED SUMINISTRO PVC 1 1/2" ML ### 24,210 24,210 24,210 24,210 24,210 24,210 24,210 24,210 24,210 24,210
11.26 RED SUMINISTRO PVC 1" ML ### 14,982 14,982 14,982 14,982 14,982 14,982 14,982 14,982 14,982 14,982
11.27 RED SUMINISTRO PVC 1/2" ML ### 8,969 8,969 8,969 8,969 8,969 8,969 8,969 8,969 8,969 8,969
11.28 RED SUMINISTRO PVC 2 1/2" ML ### 53,816 53,816 53,816 53,816 53,816 53,816 53,816 53,816 53,816 53,816
11.29 RED SUMINISTRO PVC 2" ML ### 34,463 34,463 34,463 34,463 34,463 34,463 34,463 34,463 34,463 34,463
11.30 RED SUMINISTRO PVC 3/4" ML ### 11,219 11,219 11,219 11,219 11,219 11,219 11,219 11,219 11,219 11,219
11.31 RED SANITARIA PVC-S 2" ML ### 26,662 26,662 26,662 26,662 26,662 26,662 26,662 26,662 26,662 26,662
11.32 RED SANITARIA PVC-S 3" ML ### 36,957 36,957 36,957 36,957 36,957 36,957 36,957 36,957 36,957 36,957
11.33 RED SANITARIA PVC-S 4" ML ### 50,129 50,129 50,129 50,129 50,129 50,129 50,129 50,129 50,129 50,129
11.34 RED SANITARIA PVC-S 6" ML ### 93,467 93,467 93,467 93,467 93,467 93,467 93,467 93,467 93,467 93,467
11.35 REGISTRO 1" UN ### 113,725 113,725 113,725 113,725 113,725 113,725 113,725 113,725 113,725 113,725
11.36 REGISTRO 1/2" UN ### 63,437 63,437 63,437 63,437 63,437 63,437 63,437 63,437 63,437 63,437
11.37 REGISTRO 3/4" UN ### 80,684 80,684 80,684 80,684 80,684 80,684 80,684 80,684 80,684 80,684
11.38 REGISTRO 1 1/2" UN ### 194,645 194,645 194,645 194,645 194,645 194,645 194,645 194,645 194,645 194,645
11.39 REGISTRO 2 1/2" UN ### 400,979 400,979 400,979 400,979 400,979 400,979 400,979 400,979 400,979 400,979
11.40 REGISTRO 2" UN ### 296,422 296,422 296,422 296,422 296,422 296,422 296,422 296,422 296,422 296,422
11.41 REVENTILACIÓN 2" ML ### 18,614 18,614 18,614 18,614 18,614 18,614 18,614 18,614 18,614 18,614
11.42 REVENTILACIÓN 3" ML ### 23,482 23,482 23,482 23,482 23,482 23,482 23,482 23,482 23,482 23,482
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 INSTALACIÓN) UN ### 182,604 182,604 182,604 182,604 182,604 182,604 182,604 182,604 182,604 182,604

TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E


11.44 ISNTALACIÓN)
UN ### 296,858 296,858 296,858 296,858 296,858 296,858 296,858 296,858 296,858 296,858

TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E


11.45 INSTALACIÓN)
UN ### 493,727 493,727 493,727 493,727 493,727 493,727 493,727 493,727 493,727 493,727

TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE


11.46 ACCESORIOS Y SOPORTES) ML ### 42,554 42,554 42,554 42,554 42,554 42,554 42,554 42,554 42,554 42,554

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE


11.47 ACCESORIOS Y SOPORTES)
ML ### 50,188 50,188 50,188 50,188 50,188 50,188 50,188 50,188 50,188 50,188

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE


11.48 ACCESORIOS Y SOPORTES)
ML ### 64,472 64,472 64,472 64,472 64,472 64,472 64,472 64,472 64,472 64,472

TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE


11.49 ACCESORIOS Y SOPORTES)
ML ### 73,118 73,118 73,118 73,118 73,118 73,118 73,118 73,118 73,118 73,118

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE


11.50 ACCESORIOS Y SOPORTES)
ML ### 94,235 94,235 94,235 94,235 94,235 94,235 94,235 94,235 94,235 94,235
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE p
11.51 ACCESORIOS Y SOPORTES)
ML ### 109,226 109,226 109,226 109,226 109,226 109,226 109,226 109,226 109,226 109,226
i
TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE o
11.52 ACCESORIOS Y SOPORTES)
ML ### 161,485 161,485 161,485 161,485 161,485 161,485 161,485 161,485 161,485 161,485
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN ### 65,307 65,307 65,307 65,307 65,307 65,307 65,307 65,307 65,307 65,307
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN ### 65,571 65,571 65,571 65,571 65,571 65,571 65,571 65,571 65,571 65,571
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN ### 42,114 42,114 42,114 42,114 42,114 42,114 42,114 42,114 42,114 42,114
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN ### 51,858 51,858 51,858 51,858 51,858 51,858 51,858 51,858 51,858 51,858
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE
11.57 HASTA 2"
ML ### 4,380 4,380 4,380 4,380 4,380 4,380 4,380 4,380 4,380 4,380

PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO


11.58 MAYOR A 2"
ML ### 6,902 6,902 6,902 6,902 6,902 6,902 6,902 6,902 6,902 6,902

11.59 GABINETE TIPO III UN ### 1,067,532 1,067,532 1,067,532 1,067,532 1,067,532 1,067,532 1,067,532 1,067,532 1,067,532 1,067,532
11.60 GABINETE TIPO I UN ### 815,814 815,814 815,814 815,814 815,814 815,814 815,814 815,814 815,814 815,814
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN ### 2,741,889 2,741,889 2,741,889 2,741,889 2,741,889 2,741,889 2,741,889 2,741,889 2,741,889 2,741,889
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN ### 2,286,523 2,286,523 2,286,523 2,286,523 2,286,523 2,286,523 2,286,523 2,286,523 2,286,523 2,286,523
11.63 VÁLVULA MARIPOSA 3" UN ### 665,639 665,639 665,639 665,639 665,639 665,639 665,639 665,639 665,639 665,639
11.64 VÁLVULA MARIPOSA 4" UN ### 860,517 860,517 860,517 860,517 860,517 860,517 860,517 860,517 860,517 860,517
11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN ### 330,440 330,440 330,440 330,440 330,440 330,440 330,440 330,440 330,440 330,440

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN ### 383,395 383,395 383,395 383,395 383,395 383,395 383,395 383,395 383,395 383,395
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN ### 60,912 60,912 60,912 60,912 60,912 60,912 60,912 60,912 60,912 60,912
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN ### 72,056 72,056 72,056 72,056 72,056 72,056 72,056 72,056 72,056 72,056
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN ### 80,065 80,065 80,065 80,065 80,065 80,065 80,065 80,065 80,065 80,065
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN ### 94,233 94,233 94,233 94,233 94,233 94,233 94,233 94,233 94,233 94,233
12.6 SALIDA TELÉFONO PVC COMPLETA UN ### 57,301 57,301 57,301 57,301 57,301 57,301 57,301 57,301 57,301 57,301
12.7 SALIDA TIMBRE PVC COMPLETA UN ### 65,287 65,287 65,287 65,287 65,287 65,287 65,287 65,287 65,287 65,287
12.8 STRIP TELEFÓNICO 10 PARES UN ### 151,035 151,035 151,035 151,035 151,035 151,035 151,035 151,035 151,035 151,035
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN ### 58,812 58,812 58,812 58,812 58,812 58,812 58,812 58,812 58,812 58,812
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN ### 135,087 135,087 135,087 135,087 135,087 135,087 135,087 135,087 135,087 135,087
12.11 SALIDA T.V PVC COMPLETA. UN ### 80,839 80,839 80,839 80,839 80,839 80,839 80,839 80,839 80,839 80,839
12.12 SALIDA BIFÁSICA C.N. UN ### 47,931 47,931 47,931 47,931 47,931 47,931 47,931 47,931 47,931 47,931
12.13 TABLERO PARCIAL 4 CIRCUITOS UN ### 101,173 101,173 101,173 101,173 101,173 101,173 101,173 101,173 101,173 101,173
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 432,136 432,136 432,136 432,136 432,136 432,136 432,136 432,136 432,136 432,136

12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN ### 575,285 575,285 575,285 575,285 575,285 575,285 575,285 575,285 575,285 575,285
12.16 TUBERÍA PVC CONDUIT 1/2" ML ### 3,724 3,724 3,724 3,724 3,724 3,724 3,724 3,724 3,724 3,724
12.17 TUBERÍA PVC CONDUIT 3/4" ML ### 4,918 4,918 4,918 4,918 4,918 4,918 4,918 4,918 4,918 4,918
12.18 TUBERÍA PVC CONDUIT 1" ML ### 7,649 7,649 7,649 7,649 7,649 7,649 7,649 7,649 7,649 7,649
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML ### 13,684 13,684 13,684 13,684 13,684 13,684 13,684 13,684 13,684 13,684
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN ### 287,373 287,373 287,373 287,373 287,373 287,373 287,373 287,373 287,373 287,373

12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 81,304 81,304 81,304 81,304 81,304 81,304 81,304 81,304 81,304 81,304

12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN ### 109,889 109,889 109,889 109,889 109,889 109,889 109,889 109,889 109,889 109,889
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN ### 45,140 45,140 45,140 45,140 45,140 45,140 45,140 45,140 45,140 45,140
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN ### 1,474,315 1,474,315 1,474,315 1,474,315 1,474,315 1,474,315 1,474,315 1,474,315 1,474,315 1,474,315
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN ### 1,092,400 1,092,400 1,092,400 1,092,400 1,092,400 1,092,400 1,092,400 1,092,400 1,092,400 1,092,400
12.26 POSTE METÁLICO 6M UN ### 1,360,965 1,360,965 1,360,965 1,360,965 1,360,965 1,360,965 1,360,965 1,360,965 1,360,965 1,360,965
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN ### 633,105 633,105 633,105 633,105 633,105 633,105 633,105 633,105 633,105 633,105
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN ### 115,965 115,965 115,965 115,965 115,965 115,965 115,965 115,965 115,965 115,965
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
12.29 LUMINARIA 70W SODIO UN ### i 531,066 531,066 531,066 531,066 531,066 531,066 531,066 531,066 531,066 531,066
p
12.30 LUMINARIA 150W SODIO UN ### i 664,241 664,241 664,241 664,241 664,241 664,241 664,241 664,241 664,241 664,241
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN ### o 1,753,366 1,753,366 1,753,366 1,753,366 1,753,366 1,753,366 1,753,366 1,753,366 1,753,366 1,753,366
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN ### 1,291,370 1,291,370 1,291,370 1,291,370 1,291,370 1,291,370 1,291,370 1,291,370 1,291,370 1,291,370

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 ### 41,778 41,674 41,959 42,322 41,933 42,478 42,244 41,648 41,959 41,466
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 ### 41,356 41,252 41,537 41,900 41,512 42,056 41,823 41,226 41,537 41,045
13.3 ALISTADO PARA LISTÓN M2 ### 15,579 15,558 15,615 15,688 15,610 15,719 15,672 15,553 15,615 15,516
13.4 ALISTADO PISOS 1:3, E=0.04 M2 ### 29,035 28,828 29,398 30,124 29,347 30,436 29,969 28,776 29,398 28,413
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 ### 89,095 88,887 89,458 90,184 89,406 90,495 90,028 88,836 89,458 88,473
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML ### 27,852 27,788 27,966 28,192 27,950 28,290 28,144 27,772 27,966 27,658
13.7 CONCRETO BASE GRADAS 2500 PSI M2 ### 58,563 58,246 59,118 60,229 59,039 60,704 59,991 58,167 59,118 57,612
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 ### 80,532 80,025 81,420 83,197 81,293 83,958 82,816 79,898 81,420 79,010
13.9 MANTO FIBERGLASS 600X1 M2 ### 32,162 32,162 32,162 32,162 32,162 32,162 32,162 32,162 32,162 32,162
13.10 PEGANTE MORTERO-CONCRETO M2 ### 24,441 24,441 24,441 24,441 24,441 24,441 24,441 24,441 24,441 24,441
13.11 PERMA PLY 2 CAPAS M2 ### 28,725 28,725 28,725 28,725 28,725 28,725 28,725 28,725 28,725 28,725
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 ### 47,411 47,126 47,911 48,910 47,839 49,338 48,696 47,054 47,911 46,555
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 ### 55,410 55,061 56,020 57,241 55,933 57,765 56,980 54,974 56,020 54,363
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 ### 79,972 79,433 80,916 82,803 80,781 83,612 82,399 79,298 80,916 78,355
13.15 TRITURADO FINO 1/2 M3 ### 86,290 84,022 90,261 98,201 89,693 101,604 96,499 83,454 90,261 79,484
13.16 TRITURADO GRUESO 3/4 M3 ### 93,018 88,693 95,615 107,175 97,916 112,072 106,915 86,616 92,431 83,223

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS

14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 ### 60,612 60,570 60,684 60,829 60,674 60,892 60,798 60,560 60,684 60,487

BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA


14.2 (LINEAL)
ML ### 36,317 36,297 36,354 36,426 36,348 36,457 36,411 36,291 36,354 36,255
14.3 ADOQUÍN CONCRETO 6CM M2 ### 69,111 69,007 69,292 69,655 69,266 69,811 69,578 68,981 69,292 68,800
14.4 ADOQUÍN CONCRETO 8CM M2 ### 72,611 72,507 72,792 73,155 72,766 73,311 73,078 72,481 72,792 72,300
14.5 ADOQUÍN GRES PEATONAL M2 ### 77,136 77,032 77,317 77,680 77,291 77,836 77,602 77,006 77,317 76,824
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE
14.6 FONDO BLANCO. INCLUYE ALISTADO
M2 ### 79,788 79,746 79,860 80,006 79,850 80,068 79,974 79,736 79,860 79,663
14.7 GRAVILLA PARA GRADAS ML ### 39,634 39,591 39,709 39,859 39,698 39,923 39,827 39,581 39,709 39,506
ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y
14.8 PULIDA) M2 ### 173,234 173,047 173,561 174,214 173,514 174,494 174,074 173,001 173,561 172,674
14.9 ACABADO EN GRAVILLA LAVADA M2 ### 49,120 49,014 49,306 49,678 49,279 49,837 49,598 48,987 49,306 48,801
14.10 GUARDAESCOBA EN GRANITO ML ### 46,830 46,830 46,830 46,830 46,830 46,830 46,830 46,830 46,830 46,830
14.11 GUARDAESCOBA EN GRAVILLA ML ### 10,685 10,642 10,760 10,909 10,749 10,974 10,877 10,631 10,760 10,557
14.12 GUARDAESCOBA PVC CARAMELO ML ### 9,938 9,938 9,938 9,938 9,938 9,938 9,938 9,938 9,938 9,938
14.13 GUARDAESCOBA PVC CEDRO ML ### 13,329 13,329 13,329 13,329 13,329 13,329 13,329 13,329 13,329 13,329
14.14 GUARDAESCOBA PINO CARIBE ML ### 11,216 11,216 11,216 11,216 11,216 11,216 11,216 11,216 11,216 11,216
14.15 GUARDAESCOBA CEDRO BLANCO ML ### 18,713 18,713 18,713 18,713 18,713 18,713 18,713 18,713 18,713 18,713
14.16 GUARDAESCOBA EN MADERA SAPAN ML ### 36,353 36,353 36,353 36,353 36,353 36,353 36,353 36,353 36,353 36,353
14.17 GUARDAESCOBA GRES Y CERÁMICA ML ### 9,890 9,890 9,890 9,890 9,890 9,890 9,890 9,890 9,890 9,890
14.18 LISTÓN M.H. AMARILLO M2 ### 79,156 79,156 79,156 79,156 79,156 79,156 79,156 79,156 79,156 79,156
14.19 PASO ESCALERA GRANITO ML ### 125,814 125,668 126,068 126,576 126,032 126,794 126,467 125,632 126,068 125,378
14.20 PIRLANES ALUMINIO ML ### 8,106 8,106 8,106 8,106 8,106 8,106 8,106 8,106 8,106 8,106
14.21 PIRLANES LADRILLO ML ### 34,239 34,195 34,317 34,471 34,306 34,537 34,438 34,184 34,317 34,107
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 ### 48,702 48,702 48,702 48,702 48,702 48,702 48,702 48,702 48,702 48,702
14.23 PISO VINILO TRÁFICO PESADO M2 ### 56,547 56,547 56,547 56,547 56,547 56,547 56,547 56,547 56,547 56,547
14.24 PULIDA LACADA PISO MADERA M2 ### 52,418 52,418 52,418 52,418 52,418 52,418 52,418 52,418 52,418 52,418
14.25 TABLETA DE GRES 25X25 M2 ### 52,593 52,552 52,666 52,811 52,656 52,873 52,780 52,541 52,666 52,469
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 ### 58,996 58,954 59,068 59,214 59,058 59,276 59,182 58,944 59,068 58,871
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO i
14.27 BLANCO ML ### p 11,713 11,713 11,713 11,713 11,713 11,713 11,713 11,713 11,713 11,713
i
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 ### o 52,782 52,715 52,897 53,128 52,881 53,228 53,079 52,699 52,897 52,583
14.29 JABONERA PORCELANA ACUARIO UN ### 21,894 21,894 21,894 21,894 21,894 21,894 21,894 21,894 21,894 21,894
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 JABONERA,CEPILLERA Y PERCHA SIMPLE) UN ### 130,824 130,824 130,824 130,824 130,824 130,824 130,824 130,824 130,824 130,824
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN ### 10,652 10,652 10,652 10,652 10,652 10,652 10,652 10,652 10,652 10,652
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN ### 23,927 23,927 23,927 23,927 23,927 23,927 23,927 23,927 23,927 23,927
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN ### 15,412 15,412 15,412 15,412 15,412 15,412 15,412 15,412 15,412 15,412
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN ### 14,978 14,978 14,978 14,978 14,978 14,978 14,978 14,978 14,978 14,978
14.35 REMATES BOCEL ALUMINIO ML ### 9,168 9,168 9,168 9,168 9,168 9,168 9,168 9,168 9,168 9,168
14.36 REMATES BOCEL PORCELANA ML ### 9,327 9,327 9,327 9,327 9,327 9,327 9,327 9,327 9,327 9,327
14.37 TAPA REGISTRO 20X20 UN ### 20,298 20,298 20,298 20,298 20,298 20,298 20,298 20,298 20,298 20,298
14.38 TAPA REGISTRO 6X6 UN ### 18,512 18,512 18,512 18,512 18,512 18,512 18,512 18,512 18,512 18,512
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE
14.39 MÁRMOL N.5
M2 ### 19,740 19,740 19,740 19,740 19,740 19,740 19,740 19,740 19,740 19,740

DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL


14.40 FUNDIDO EN SITIO M2 ### 22,820 22,820 22,820 22,820 22,820 22,820 22,820 22,820 22,820 22,820

14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 ### 69,149 69,108 69,222 69,367 69,211 69,429 69,336 69,097 69,222 69,025
14.42 MEDIA CAÑA EN GRANITO ML ### 82,037 82,037 82,037 82,037 82,037 82,037 82,037 82,037 82,037 82,037
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 ### 36,673 36,673 36,673 36,673 36,673 36,673 36,673 36,673 36,673 36,673
14.44 PINTURA ACRÍLICA PARA PISOS M2 ### 14,136 14,136 14,136 14,136 14,136 14,136 14,136 14,136 14,136 14,136
PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS
14.45 DEPORTIVOS M2 ### 107,582 107,582 107,582 107,582 107,582 107,582 107,582 107,582 107,582 107,582
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 ### 130,368 130,368 130,368 130,368 130,368 130,368 130,368 130,368 130,368 130,368

15 CIELO RASO
15.1 APLIQUE YESO ML ### 77,101 77,101 77,101 77,101 77,101 77,101 77,101 77,101 77,101 77,101
15.2 ARMADURA MADERA Y MALLA M2 ### 38,480 38,480 38,480 38,480 38,480 38,480 38,480 38,480 38,480 38,480
15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 ### 59,033 59,033 59,033 59,033 59,033 59,033 59,033 59,033 59,033 59,033
15.4 CIELO RASO DURACUSTIC M2 ### 72,321 72,321 72,321 72,321 72,321 72,321 72,321 72,321 72,321 72,321
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 ### 54,024 54,024 54,024 54,024 54,024 54,024 54,024 54,024 54,024 54,024
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 ### 99,964 99,964 99,964 99,964 99,964 99,964 99,964 99,964 99,964 99,964
15.7 CORNISAS YESO ML ### 51,720 51,720 51,720 51,720 51,720 51,720 51,720 51,720 51,720 51,720
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 ### 110,378 110,378 110,378 110,378 110,378 110,378 110,378 110,378 110,378 110,378
15.9 MALLA CON VENA M2 ### 14,394 14,394 14,394 14,394 14,394 14,394 14,394 14,394 14,394 14,394

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 ### 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773 5,773

EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE


16.2 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688 18,688

16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 ### 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460 27,460

EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M


16.4 (INCLUYE M3 ### 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941 45,941
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M


16.5 (INCLUYE M3 ### 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599 52,599
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN


16.6 EXPLOSIVOS)
M3 ### 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578 89,578

RELLENO CON MATERIAL DEL SITIO COMPACTADO


16.7 MECÁNICAMENTE
M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 ### p 87,480 76,934 83,965 105,056 96,268 113,844 110,329 69,904 69,904 69,904
i
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 ###
o 91,779 89,357 96,019 104,499 95,413 108,134 102,682 88,750 96,019 84,510

RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO


16.10 MECÁNICAMENTE
M3 ### 112,441 126,502 124,745 163,412 145,836 131,775 117,714 126,502 138,805 118,989

16.11 AFRIMADO (NORMA INVIAS 311) M3 ### 83,045 71,691 78,721 99,813 91,025 108,601 105,085 64,661 64,661 64,661
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 ### 108,228 122,289 120,531 159,198 141,622 127,561 113,501 122,289 134,592 109,985
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 ### 108,875 122,936 121,179 159,846 142,270 128,209 114,148 122,936 135,239 115,423

17 APARATOS SANITARIOS
SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE
17.1 GRIFERÍA) UN ### 319,931 319,931 319,931 319,931 319,931 319,931 319,931 319,931 319,931 319,931

SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE


17.2 GRIFERÍA) UN ### 941,204 941,204 941,204 941,204 941,204 941,204 941,204 941,204 941,204 941,204

SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE


17.3 GRIFERÍA)
UN ### 510,388 510,388 510,388 510,388 510,388 510,388 510,388 510,388 510,388 510,388

SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE


17.4 GRIFERÍA)
UN ### 148,812 148,812 148,812 148,812 148,812 148,812 148,812 148,812 148,812 148,812

SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE


17.5 GRIFERÍA)
UN ### 207,792 207,792 207,792 207,792 207,792 207,792 207,792 207,792 207,792 207,792

SUMINISTRO E INSTALACIÓN LAVAMANOS DE


17.6 EMPOTRAR(INCLUYE GRIFERÍA)
UN ### 193,050 193,050 193,050 193,050 193,050 193,050 193,050 193,050 193,050 193,050

SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE


17.7 GRIFERÍA)
UN ### 423,729 423,729 423,729 423,729 423,729 423,729 423,729 423,729 423,729 423,729

SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE


17.8 GRIFERÍA) UN ### 1,082,240 1,082,240 1,082,240 1,082,240 1,082,240 1,082,240 1,082,240 1,082,240 1,082,240 1,082,240

SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE


17.9 GRIFERÍA) UN ### 308,090 308,090 308,090 308,090 308,090 308,090 308,090 308,090 308,090 308,090

SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A


17.10 BAÑERA UN ### 218,672 218,672 218,672 218,672 218,672 218,672 218,672 218,672 218,672 218,672

17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN ### 87,592 87,592 87,592 87,592 87,592 87,592 87,592 87,592 87,592 87,592
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN
17.12 ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y UN ### 264,411 264,411 264,411 264,411 264,411 264,411 264,411 264,411 264,411 264,411
GRIFERÍA)

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN


17.13 ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y UN ### 389,010 389,010 389,010 389,010 389,010 389,010 389,010 389,010 389,010 389,010
GRIFERÍA)

18 PINTURAS
IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O
18.1 SIMILAR M2 ### 8,880 8,880 8,880 8,880 8,880 8,880 8,880 8,880 8,880 8,880
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML ### 3,285 3,285 3,285 3,285 3,285 3,285 3,285 3,285 3,285 3,285
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 ### 11,867 11,867 11,867 11,867 11,867 11,867 11,867 11,867 11,867 11,867
18.4 BARNIZ SOBRE MUEBLES M2 ### 44,895 44,895 44,895 44,895 44,895 44,895 44,895 44,895 44,895 44,895
18.5 CARBURO SOBRE PAÑETES M2 ### 6,218 6,218 6,218 6,218 6,218 6,218 6,218 6,218 6,218 6,218
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 ### 69,448 69,448 69,448 69,448 69,448 69,448 69,448 69,448 69,448 69,448
18.7 DEMARCACIÓN CON MARMOLINA ML ### 3,704 3,704 3,704 3,704 3,704 3,704 3,704 3,704 3,704 3,704
18.8 ESMALTE SOBRE LÁMINA LINEAL ML ### 2,950 2,950 2,950 2,950 2,950 2,950 2,950 2,950 2,950 2,950
18.9 ESMALTE SOBRE LÁMINA LLENA M2 ### 14,837 14,837 14,837 14,837 14,837 14,837 14,837 14,837 14,837 14,837
18.10 ESMALTE SOBRE MADERA LINEAL ML ### 4,293 4,293 4,293 4,293 4,293 4,293 4,293 4,293 4,293 4,293
18.11 ESMALTE SOBRE MADERA LLENA M2 ### 15,642 15,642 15,642 15,642 15,642 15,642 15,642 15,642 15,642 15,642
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 ### i 6,090 6,090 6,090 6,090 6,090 6,090 6,090 6,090 6,090 6,090
p
18.13 ESMALTE SOBRE MARCOS MADERA M2 ### i 6,937 6,937 6,937 6,937 6,937 6,937 6,937 6,937 6,937 6,937
18.14 ESTUCO M2 ### o 7,488 7,488 7,488 7,488 7,488 7,488 7,488 7,488 7,488 7,488
18.15 ESTUCO (LINEAL) ML ### 4,692 4,692 4,692 4,692 4,692 4,692 4,692 4,692 4,692 4,692
18.16 ESTUCO Y VINILO 3 MANOS M2 ### 16,523 16,523 16,523 16,523 16,523 16,523 16,523 16,523 16,523 16,523
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML ### 10,253 10,253 10,253 10,253 10,253 10,253 10,253 10,253 10,253 10,253
18.18 LACA PISOS MADERA M2 ### 24,277 24,277 24,277 24,277 24,277 24,277 24,277 24,277 24,277 24,277
18.19 LÍNEAS TRÁFICO 0.10 ML ### 2,862 2,862 2,862 2,862 2,862 2,862 2,862 2,862 2,862 2,862
18.20 MARMOLINA SOBRE PAÑETE M2 ### 12,914 12,914 12,914 12,914 12,914 12,914 12,914 12,914 12,914 12,914
18.21 TINTILLA SOBRE MADERA LINEAL ML ### 3,486 3,486 3,486 3,486 3,486 3,486 3,486 3,486 3,486 3,486
18.22 TINTILLA SOBRE MADERA LLENA M2 ### 13,402 13,402 13,402 13,402 13,402 13,402 13,402 13,402 13,402 13,402
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 ### 7,541 7,541 7,541 7,541 7,541 7,541 7,541 7,541 7,541 7,541
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML ### 4,746 4,746 4,746 4,746 4,746 4,746 4,746 4,746 4,746 4,746
18.25 WASH-PRIMER SOBRE ALUMNIO M2 ### 23,148 23,148 23,148 23,148 23,148 23,148 23,148 23,148 23,148 23,148
18.26 PINTURA EPÓXICA M2 ### 13,512 13,512 13,512 13,512 13,512 13,512 13,512 13,512 13,512 13,512
18.27 PINTURA EPÓXICA (LINEAL) ML ### 8,356 8,356 8,356 8,356 8,356 8,356 8,356 8,356 8,356 8,356

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN ### 6,403,635 6,403,635 6,403,635 6,403,635 6,403,635 6,403,635 6,403,635 6,403,635 6,403,635 6,403,635
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)
UN ### 11,314,253 11,314,253 11,314,253 11,314,253 11,314,253 11,314,253 11,314,253 11,314,253 ### 11,314,253
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN ### 2,961,065 2,961,065 2,961,065 2,961,065 2,961,065 2,961,065 2,961,065 2,961,065 2,961,065 2,961,065
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO
19.4 (PAR) UN ### 9,676,692 9,676,692 9,676,692 9,676,692 9,676,692 9,676,692 9,676,692 9,676,692 9,676,692 9,676,692
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN ### 9,061,385 9,061,385 9,061,385 9,061,385 9,061,385 9,061,385 9,061,385 9,061,385 9,061,385 9,061,385
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML ### 2,862 2,862 2,862 2,862 2,862 2,862 2,862 2,862 2,862 2,862
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN ### 909,320 909,320 909,320 909,320 909,320 909,320 909,320 909,320 909,320 909,320
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN ### 90,781 90,781 90,781 90,781 90,781 90,781 90,781 90,781 90,781 90,781
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN ### 1,644,431 1,644,399 1,644,488 1,644,602 1,644,480 1,644,651 1,644,578 1,644,390 1,644,488 1,644,333
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML ### 706,817 706,047 708,167 710,865 707,974 712,021 710,287 705,854 708,167 704,505

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML ### 30,843 30,843 30,843 30,843 30,843 30,843 30,843 30,843 30,843 30,843
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML ### 45,893 45,893 45,893 45,893 45,893 45,893 45,893 45,893 45,893 45,893
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML ### 56,926 56,926 56,926 56,926 56,926 56,926 56,926 56,926 56,926 56,926
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE
20.4 ACCESORIOS)
ML ### 18,537 18,537 18,537 18,537 18,537 18,537 18,537 18,537 18,537 18,537
TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE
20.5 ACCESORIOS) ML ### 22,478 22,478 22,478 22,478 22,478 22,478 22,478 22,478 22,478 22,478
TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE
20.6 ACCESORIOS)
ML ### 30,658 30,658 30,658 30,658 30,658 30,658 30,658 30,658 30,658 30,658
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML ### 27,279 27,279 27,279 27,279 27,279 27,279 27,279 27,279 27,279 27,279
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML ### 28,779 28,779 28,779 28,779 28,779 28,779 28,779 28,779 28,779 28,779
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML ### 36,013 36,013 36,013 36,013 36,013 36,013 36,013 36,013 36,013 36,013
20.10 VÁLVULA DE BOLA GAS 1/2" UN ### 18,666 18,666 18,666 18,666 18,666 18,666 18,666 18,666 18,666 18,666
20.11 VÁLVULA DE BOLA GAS 3/4" UN ### 24,455 24,455 24,455 24,455 24,455 24,455 24,455 24,455 24,455 24,455
20.12 VÁLVULA DE BOLA GAS 1" UN ### 37,591 37,591 37,591 37,591 37,591 37,591 37,591 37,591 37,591 37,591
20.13 VÁLVULA POLIETILENO GAS 1/2" UN ### 287,638 287,638 287,638 287,638 287,638 287,638 287,638 287,638 287,638 287,638
20.14 VÁLVULA POLIETILENO GAS 3/4" UN ### 331,054 331,054 331,054 331,054 331,054 331,054 331,054 331,054 331,054 331,054
20.15 VÁLVULA POLIETILENO GAS 1" UN ### 345,274 345,274 345,274 345,274 345,274 345,274 345,274 345,274 345,274 345,274
20.16 ACOMETIDA GAS 1/2" ML ### 320,583 320,583 320,583 320,583 320,583 320,583 320,583 320,583 320,583 320,583

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN ### 234,186 234,186 234,186 234,186 234,186 234,186 234,186 234,186 234,186 234,186
21.2 CABLE DETECTOR LINEAL DE CALOR ML ### 35,858 35,858 35,858 35,858 35,858 35,858 35,858 35,858 35,858 35,858
21.3 SIRENA DE 110 V UN ### 109,450 109,450 109,450 109,450 109,450 109,450 109,450 109,450 109,450 109,450
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
21.4 CÁMARA CCTV UN ### i 278,893 278,893 278,893 278,893 278,893 278,893 278,893 278,893 278,893 278,893
p
21.5 PARLANTE-CIELO FALSO UN ### i 55,116 55,116 55,116 55,116 55,116 55,116 55,116 55,116 55,116 55,116
21.6 AMPLIFICADOR 100W UN ### o 605,974 605,974 605,974 605,974 605,974 605,974 605,974 605,974 605,974 605,974
21.7 AMPLIFICADOR 300W UN ### 1,500,427 1,500,427 1,500,427 1,500,427 1,500,427 1,500,427 1,500,427 1,500,427 1,500,427 1,500,427
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML ### 47,808 47,808 47,808 47,808 47,808 47,808 47,808 47,808 47,808 47,808
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN ### 234,119 234,119 234,119 234,119 234,119 234,119 234,119 234,119 234,119 234,119
21.10 TOMA PARA MICRÓFONO UN ### 46,681 46,681 46,681 46,681 46,681 46,681 46,681 46,681 46,681 46,681
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML ### 3,981 3,981 3,981 3,981 3,981 3,981 3,981 3,981 3,981 3,981
21.12 SPLITERS UN ### 6,672 6,672 6,672 6,672 6,672 6,672 6,672 6,672 6,672 6,672
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML ### 19,831 19,831 19,831 19,831 19,831 19,831 19,831 19,831 19,831 19,831
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML ### 25,945 25,945 25,945 25,945 25,945 25,945 25,945 25,945 25,945 25,945
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML ### 33,694 33,694 33,694 33,694 33,694 33,694 33,694 33,694 33,694 33,694
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML ### 129,768 129,768 129,768 129,768 129,768 129,768 129,768 129,768 129,768 129,768
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO
21.17 30X120
ML ### 33,862 33,862 33,862 33,862 33,862 33,862 33,862 33,862 33,862 33,862

21.18 BANDEJA PORTACABLES PARA RACK UN ### 110,620 110,620 110,620 110,620 110,620 110,620 110,620 110,620 110,620 110,620
21.19 RACK 2' X 24" UN ### 195,077 195,077 195,077 195,077 195,077 195,077 195,077 195,077 195,077 195,077
21.20 RACK 3' X 24" UN ### 305,676 305,676 305,676 305,676 305,676 305,676 305,676 305,676 305,676 305,676
21.21 RACK 5' X 24" UN ### 380,116 380,116 380,116 380,116 380,116 380,116 380,116 380,116 380,116 380,116
21.22 RACK 7' X 24" UN ### 415,116 415,116 415,116 415,116 415,116 415,116 415,116 415,116 415,116 415,116
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN ### 609,172 609,172 609,172 609,172 609,172 609,172 609,172 609,172 609,172 609,172
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN ### 359,215 359,215 359,215 359,215 359,215 359,215 359,215 359,215 359,215 359,215
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y
21.25 MARCACIÓN) UN ### 110,003 110,003 110,003 110,003 110,003 110,003 110,003 110,003 110,003 110,003
21.26 PATCH CORD 2M CATEGORÍA 6A UN ### 14,632 14,632 14,632 14,632 14,632 14,632 14,632 14,632 14,632 14,632
21.27 PATCH CORD 5M CATEGORÍA 6A UN ### 29,892 29,892 29,892 29,892 29,892 29,892 29,892 29,892 29,892 29,892
21.28 CABLE UTP CATEGORÍA 6A ML ### 5,302 5,302 5,302 5,302 5,302 5,302 5,302 5,302 5,302 5,302
21.29 CANALETA METÁLICA 4X6 CMS ML ### 37,406 37,406 37,406 37,406 37,406 37,406 37,406 37,406 37,406 37,406
21.30 CANALETA METÁLICA 4X10 CMS ML ### 39,074 39,074 39,074 39,074 39,074 39,074 39,074 39,074 39,074 39,074
21.31 CANALETA METÁLICA 6X10 CMS ML ### 39,908 39,908 39,908 39,908 39,908 39,908 39,908 39,908 39,908 39,908
21.32 CANALETA PLÁSTICA 13X7 MM ML ### 26,041 26,041 26,041 26,041 26,041 26,041 26,041 26,041 26,041 26,041
21.33 CANALETA PLÁSTICA 20X12 MM ML ### 28,785 28,785 28,785 28,785 28,785 28,785 28,785 28,785 28,785 28,785
21.34 CANALETA PLÁSTICA 32X12 MM ML ### 29,937 29,937 29,937 29,937 29,937 29,937 29,937 29,937 29,937 29,937
21.35 CANALETA PLÁSTICA 40X60 MM ML ### 50,203 50,203 50,203 50,203 50,203 50,203 50,203 50,203 50,203 50,203
21.36 SWITCH 10/100/1000 24 PUERTOS UN ### 648,673 648,673 648,673 648,673 648,673 648,673 648,673 648,673 648,673 648,673
21.37 SWITCH 10/100/1000 16 PUERTOS UN ### 333,557 333,557 333,557 333,557 333,557 333,557 333,557 333,557 333,557 333,557
21.38 SWITCH 10/100/1000 8 PUERTOS UN ### 94,039 94,039 94,039 94,039 94,039 94,039 94,039 94,039 94,039 94,039
21.39 CABLE TELEFÓNICO 2 PARES ML ### 1,948 1,948 1,948 1,948 1,948 1,948 1,948 1,948 1,948 1,948
21.40 CABLE TELEFÓNICO 10 PARES ML ### 8,988 8,988 8,988 8,988 8,988 8,988 8,988 8,988 8,988 8,988
21.41 CABLE TELEFÓNICO 20 PARES ML ### 13,381 13,381 13,381 13,381 13,381 13,381 13,381 13,381 13,381 13,381
21.42 CABLE TELEFÓNICO 40 PARES ML ### 22,314 22,314 22,314 22,314 22,314 22,314 22,314 22,314 22,314 22,314
21.43 CABLE TELEVISIÓN RG6 ML ### 4,144 4,144 4,144 4,144 4,144 4,144 4,144 4,144 4,144 4,144
21.44 ACOMETIDA TELEFÓNICA 1/2" ML ### 23,800 23,800 23,800 23,800 23,800 23,800 23,800 23,800 23,800 23,800
21.45 ACOMETIDA TELEFÓNICA 1" ML ### 34,566 34,566 34,566 34,566 34,566 34,566 34,566 34,566 34,566 34,566
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML ### 20,570 20,570 20,570 20,570 20,570 20,570 20,570 20,570 20,570 20,570
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
21.47 CERTIFICACIÓN)
ML ### 16,294 16,294 16,294 16,294 16,294 16,294 16,294 16,294 16,294 16,294

21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN ### 653,760 653,760 653,760 653,760 653,760 653,760 653,760 653,760 653,760 653,760
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
p URBANISMO
1 ACUEDUCTO i
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN ### o 28,662 28,662 28,662 28,662 28,662 28,662 28,662 28,662 28,662 28,662
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN ### 95,730 95,730 95,730 95,730 95,730 95,730 95,730 95,730 95,730 95,730
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN ### 538,526 538,526 538,526 538,526 538,526 538,526 538,526 538,526 538,526 538,526
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN ### 1,149,381 1,149,381 1,149,381 1,149,381 1,149,381 1,149,381 1,149,381 1,149,381 1,149,381 1,149,381
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN ### 131,854 131,854 131,854 131,854 131,854 131,854 131,854 131,854 131,854 131,854
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN ### 802,485 802,485 802,485 802,485 802,485 802,485 802,485 802,485 802,485 802,485
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN ### 1,726,626 1,726,626 1,726,626 1,726,626 1,726,626 1,726,626 1,726,626 1,726,626 1,726,626 1,726,626
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN ### 13,907 13,907 13,907 13,907 13,907 13,907 13,907 13,907 13,907 13,907
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN ### 17,123 17,123 17,123 17,123 17,123 17,123 17,123 17,123 17,123 17,123
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN ### 21,467 21,467 21,467 21,467 21,467 21,467 21,467 21,467 21,467 21,467
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN ### 23,483 23,483 23,483 23,483 23,483 23,483 23,483 23,483 23,483 23,483
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN ### 28,127 28,127 28,127 28,127 28,127 28,127 28,127 28,127 28,127 28,127
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN ### 28,127 28,127 28,127 28,127 28,127 28,127 28,127 28,127 28,127 28,127
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN ### 112,647 112,647 112,647 112,647 112,647 112,647 112,647 112,647 112,647 112,647
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN ### 130,497 130,497 130,497 130,497 130,497 130,497 130,497 130,497 130,497 130,497
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN ### 403,769 403,769 403,769 403,769 403,769 403,769 403,769 403,769 403,769 403,769
1.17 TEE PVC UNIÓN MECÁNICA 2" UN ### 151,595 151,595 151,595 151,595 151,595 151,595 151,595 151,595 151,595 151,595
1.18 TEE PVC UNIÓN MECÁNICA 4" UN ### 249,904 249,904 249,904 249,904 249,904 249,904 249,904 249,904 249,904 249,904
1.19 TEE PVC UNIÓN MECÁNICA 8" UN ### 1,105,443 1,105,443 1,105,443 1,105,443 1,105,443 1,105,443 1,105,443 1,105,443 1,105,443 1,105,443
1.20 TEE PVC UNIÓN MECÁNICA 10" UN ### 1,273,581 1,273,581 1,273,581 1,273,581 1,273,581 1,273,581 1,273,581 1,273,581 1,273,581 1,273,581
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML ### 15,041 15,041 15,041 15,041 15,041 15,041 15,041 15,041 15,041 15,041
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML ### 13,284 13,284 13,284 13,284 13,284 13,284 13,284 13,284 13,284 13,284
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML ### 32,563 32,563 32,563 32,563 32,563 32,563 32,563 32,563 32,563 32,563
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML ### 129,483 129,483 129,483 129,483 129,483 129,483 129,483 129,483 129,483 129,483
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML ### 192,648 192,648 192,648 192,648 192,648 192,648 192,648 192,648 192,648 192,648
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML ### 31,566 31,566 31,566 31,566 31,566 31,566 31,566 31,566 31,566 31,566
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML ### 108,606 108,606 108,606 108,606 108,606 108,606 108,606 108,606 108,606 108,606
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML ### 160,770 160,770 160,770 160,770 160,770 160,770 160,770 160,770 160,770 160,770
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN ### 31,868 31,868 31,868 31,868 31,868 31,868 31,868 31,868 31,868 31,868
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN ### 65,665 65,665 65,665 65,665 65,665 65,665 65,665 65,665 65,665 65,665
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN ### 264,120 264,120 264,120 264,120 264,120 264,120 264,120 264,120 264,120 264,120
1.32 UNIÓN REPARACION PVC 4" UN ### 76,585 76,585 76,585 76,585 76,585 76,585 76,585 76,585 76,585 76,585
1.33 UNIÓN REPARACIÓN PVC 8" UN ### 307,239 307,239 307,239 307,239 307,239 307,239 307,239 307,239 307,239 307,239
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN ### 184,623 184,623 184,623 184,623 184,623 184,623 184,623 184,623 184,623 184,623
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN ### 524,335 524,335 524,335 524,335 524,335 524,335 524,335 524,335 524,335 524,335
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN ### 1,403,007 1,403,007 1,403,007 1,403,007 1,403,007 1,403,007 1,403,007 1,403,007 1,403,007 1,403,007
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN ### 2,073,036 2,073,036 2,073,036 2,073,036 2,073,036 2,073,036 2,073,036 2,073,036 2,073,036 2,073,036

2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 ### 11,425 11,425 11,425 11,425 11,425 11,425 11,425 11,425 11,425 11,425
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 ### 26,132 26,132 26,132 26,132 26,132 26,132 26,132 26,132 26,132 26,132
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 ### 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990 19,990
2.4 RELLENO TIPO 1 "GRAVILLA" M3 ### 72,652 70,340 76,700 84,795 76,122 88,264 83,060 69,762 76,700 65,714
2.5 RELLENO TIPO 2 "RECEBO" M3 ### 82,188 71,643 78,673 99,764 90,976 108,552 105,037 64,612 64,612 64,612
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 ### 88,599 77,244 84,275 105,366 96,578 114,154 110,639 70,214 70,214 70,214
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 ### 87,614 95,812 94,788 117,334 107,086 98,887 90,688 95,812 102,986 88,638
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 ### 63,941 72,299 71,254 94,238 83,791 75,433 67,075 72,299 79,612 64,985
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 ### 98,822 95,959 103,833 113,855 103,117 118,150 111,707 95,243 103,833 90,231

3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN ### 120,411 120,411 120,411 120,411 120,411 120,411 120,411 120,411 120,411 120,411
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
3.2 CODO 45 PVC ALCANTARILLADO 16" UN ### i 1,254,550 1,254,550 1,254,550 1,254,550 1,254,550 1,254,550 1,254,550 1,254,550 1,254,550 1,254,550
p
3.3 CODO 90 PVC ALCANTARILLADO 8" UN ### i 157,329 157,329 157,329 157,329 157,329 157,329 157,329 157,329 157,329 157,329
3.4 CODO 90 PVC ALCANTARILLADO 16" UN ### o 1,453,069 1,453,069 1,453,069 1,453,069 1,453,069 1,453,069 1,453,069 1,453,069 1,453,069 1,453,069
3.5 CODO 90 PVC ALCANTARILLADO 24" UN ### 1,012,846 1,012,846 1,012,846 1,012,846 1,012,846 1,012,846 1,012,846 1,012,846 1,012,846 1,012,846
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN ### 63,528 63,528 63,528 63,528 63,528 63,528 63,528 63,528 63,528 63,528
3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN ### 119,532 119,532 119,532 119,532 119,532 119,532 119,532 119,532 119,532 119,532
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN ### 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN ### 282,146 282,146 282,146 282,146 282,146 282,146 282,146 282,146 282,146 282,146
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN ### 452,932 452,932 452,932 452,932 452,932 452,932 452,932 452,932 452,932 452,932
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN ### 119,583 119,583 119,583 119,583 119,583 119,583 119,583 119,583 119,583 119,583
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN ### 119,583 119,583 119,583 119,583 119,583 119,583 119,583 119,583 119,583 119,583
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN ### 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN ### 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153 282,153
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN ### 452,932 452,932 452,932 452,932 452,932 452,932 452,932 452,932 452,932 452,932
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML ### 454,714 454,714 454,714 454,714 454,714 454,714 454,714 454,714 454,714 454,714
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML ### 738,294 738,294 738,294 738,294 738,294 738,294 738,294 738,294 738,294 738,294
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML ### 1,184,959 1,184,959 1,184,959 1,184,959 1,184,959 1,184,959 1,184,959 1,184,959 1,184,959 1,184,959
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML ### 73,321 73,321 73,321 73,321 73,321 73,321 73,321 73,321 73,321 73,321
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML ### 380,514 380,514 380,514 380,514 380,514 380,514 380,514 380,514 380,514 380,514
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML ### 426,873 426,873 426,873 426,873 426,873 426,873 426,873 426,873 426,873 426,873
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML ### 1,180,598 1,180,598 1,180,598 1,180,598 1,180,598 1,180,598 1,180,598 1,180,598 1,180,598 1,180,598
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML ### 69,173 69,143 69,225 69,328 69,217 69,372 69,306 69,136 69,225 69,084
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML ### 344,957 344,957 344,957 344,957 344,957 344,957 344,957 344,957 344,957 344,957
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML ### 52,581 52,581 52,581 52,581 52,581 52,581 52,581 52,581 52,581 52,581
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML ### 74,327 74,327 74,327 74,327 74,327 74,327 74,327 74,327 74,327 74,327
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML ### 107,219 107,219 107,219 107,219 107,219 107,219 107,219 107,219 107,219 107,219
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML ### 164,563 164,563 164,563 164,563 164,563 164,563 164,563 164,563 164,563 164,563
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML ### 264,398 264,398 264,398 264,398 264,398 264,398 264,398 264,398 264,398 264,398
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML ### 383,489 383,489 383,489 383,489 383,489 383,489 383,489 383,489 383,489 383,489
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML ### 485,314 485,314 485,314 485,314 485,314 485,314 485,314 485,314 485,314 485,314
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML ### 638,128 638,128 638,128 638,128 638,128 638,128 638,128 638,128 638,128 638,128
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML ### 877,711 877,711 877,711 877,711 877,711 877,711 877,711 877,711 877,711 877,711

4 ALCANTARILLADO - SUMIDEROS Y POZOS


PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI
4.1 CON REFUERZO)
UN ### 689,780 687,930 693,018 699,494 692,556 702,269 698,106 687,468 693,018 684,229

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.


4.2 PAÑETE INTERNO E=1.5CM Y CAÑUELA) ML ### 678,360 677,038 680,673 685,298 680,342 687,280 684,306 676,708 680,673 674,396

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON


4.3 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 740,034 738,801 742,193 746,510 741,884 748,360 745,585 738,492 742,193 736,334

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000


4.4 PSI CON REFUERZO) UN ### 817,874 815,562 821,922 830,017 821,344 833,486 828,282 814,984 821,922 810,936

CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.


4.5 PAÑETE INTERNO E=1.5CM Y CAÑUELA)
ML ### 962,298 960,436 965,554 972,067 965,089 974,859 970,671 959,972 965,554 956,715

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON


4.6 REFUERZO (INCLUYE ARO Y TAPA HF) UN ### 851,934 850,238 854,902 860,838 854,478 863,382 859,566 849,814 854,902 846,846
4.7 SUMIDERO EN LADRILLO SL-100 UN ### 1,044,602 1,043,668 1,046,241 1,049,509 1,046,006 1,050,912 1,048,809 1,043,437 1,046,241 1,041,799
4.8 SUMIDERO EN LADRILLO SL-250 UN ### 1,503,721 1,501,052 1,508,398 1,517,738 1,507,728 1,521,745 1,515,737 1,500,389 1,508,398 1,495,712
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN ### 2,039,190 2,034,276 2,047,791 2,064,990 2,046,562 2,072,362 2,061,304 2,033,047 2,047,791 2,024,446
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN ### 2,691,995 2,683,827 2,706,292 2,734,882 2,704,250 2,747,137 2,728,755 2,681,785 2,706,292 2,667,487
4.11 SUMIDERO PREFABRICADO SL-100 UN ### 1,925,749 1,925,749 1,925,749 1,925,749 1,925,749 1,925,749 1,925,749 1,925,749 1,925,749 1,925,749
4.12 SUMIDERO PREFABRICADO SL-250 UN ### 4,070,034 4,070,034 4,070,034 4,070,034 4,070,034 4,070,034 4,070,034 4,070,034 4,070,034 4,070,034
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, p
4.13 H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)
UN ###
i 145,805 145,751 145,899 146,088 145,886 146,169 146,048 145,738 145,899 145,643
o

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 ### 77,055 76,900 77,324 77,864 77,286 78,095 77,748 76,862 77,324 76,592
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 ### 91,199 91,044 91,468 92,008 91,430 92,239 91,892 91,006 91,468 90,736
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 ### 56,293 55,960 56,876 58,041 56,792 58,541 57,792 55,877 56,876 55,294
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 ### 61,179 60,855 61,746 62,879 61,665 63,365 62,636 60,774 61,746 60,208
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 ### 61,478 61,164 62,029 63,130 61,950 63,602 62,894 61,085 62,029 60,535
5.6 BORDE SEPARADOR VERDE A-170 ML ### 265,713 265,659 265,808 265,996 265,794 266,077 265,956 265,646 265,808 265,551
5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 19,167 19,127 19,237 19,377 19,227 19,437 19,347 19,117 19,237 19,047

5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML ### 40,333 40,099 40,744 41,565 40,685 41,918 41,389 40,040 40,744 39,629
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML ### 87,512 87,483 87,562 87,663 87,555 87,707 87,642 87,476 87,562 87,425
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN ### 581,247 580,514 582,529 585,093 582,346 586,192 584,544 580,331 582,529 579,049
5.11 LOSETA PREFABRICADA A-40 M2 ### 65,225 65,101 65,441 65,873 65,410 66,058 65,780 65,071 65,441 64,855
5.12 LOSETA PREFABRICADA A-60 M2 ### 94,633 94,510 94,849 95,281 94,819 95,467 95,189 94,479 94,849 94,263
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE
5.13 3000 PSI
ML ### 34,133 34,004 34,360 34,813 34,327 35,007 34,716 33,971 34,360 33,745

SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000


5.14 PSI
ML ### 54,422 54,160 54,881 55,798 54,815 56,191 55,601 54,094 54,881 53,636
5.15 SARDINEL PREFABRICADO A-10 ML ### 97,715 99,279 99,159 103,638 101,540 100,099 98,442 99,271 100,751 98,565
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 ### 62,981 62,906 63,111 63,373 63,093 63,485 63,317 62,887 63,111 62,757

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN ### 211,710 211,556 211,980 212,520 211,941 212,751 212,404 211,517 211,980 211,248
6.2 BANCA EN CONCRETO M-30 UN ### 696,472 696,256 696,850 697,605 696,796 697,929 697,443 696,202 696,850 695,824
6.3 BOLARDO M-63 ALTO/HIERRO UN ### 225,051 225,019 225,108 225,221 225,100 225,270 225,197 225,011 225,108 224,954
6.4 BOLARDO M-60 CONCRETO UN ### 168,630 168,445 168,954 169,601 168,907 169,879 169,463 168,399 168,954 168,075
6.5 BOLARDO M-61 BAJO/CONCRETO UN ### 170,610 170,425 170,933 171,581 170,887 171,859 171,442 170,378 170,933 170,055
6.6 BOLARDO M-62 BAJO/HIERRO UN ### 200,057 199,863 200,397 201,077 200,349 201,369 200,932 199,814 200,397 199,474
6.7 BORDE CONTENEDOR DE RAICES A-70 ML ### 61,923 61,805 62,130 62,543 62,100 62,720 62,455 61,776 62,130 61,569
6.8 BORDILLO PREFABRICADO A-80 ML ### 71,278 71,146 71,510 71,972 71,477 72,170 71,873 71,113 71,510 70,882
6.9 CANECA M-120 UN ### 326,493 326,463 326,544 326,647 326,537 326,692 326,625 326,456 326,544 326,404
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN ### 860,542 860,450 860,704 861,028 860,681 861,167 860,959 860,427 860,704 860,265
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN ### 3,529,983 3,529,921 3,530,090 3,530,306 3,530,075 3,530,399 3,530,260 3,529,905 3,530,090 3,529,798
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN ### 3,631,319 3,631,257 3,631,426 3,631,642 3,631,411 3,631,735 3,631,596 3,631,241 3,631,426 3,631,134
6.13 CICLOPARQUEADERO M100 TIPO 1 UN ### 507,465 507,400 507,578 507,805 507,562 507,902 507,756 507,384 507,578 507,271
6.14 CICLOPARQUEADERO M101 TIPO 2 UN ### 670,964 670,705 671,417 672,324 671,353 672,713 672,130 670,640 671,417 670,187
6.15 BANCA EN MADERA M-50 UN ### 559,144 559,144 559,144 559,144 559,144 559,144 559,144 559,144 559,144 559,144
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN ### 259,216 259,124 259,378 259,702 259,355 259,841 259,633 259,101 259,378 258,939
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN ### 601,615 601,542 601,745 602,003 601,726 602,114 601,948 601,523 601,745 601,394
6.18 POSTE HISTÓRICO M-131 UN ### 6,706,051 6,705,589 6,706,861 6,708,480 6,706,745 6,709,174 6,708,133 6,705,473 6,706,861 6,704,664

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,216 4,216 4,216 4,216 4,216 4,216 4,216 4,216 4,216 4,216
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,306 45,306 45,306 45,306 45,306 45,306 45,306 45,306 45,306 45,306
7.3 SEÑAL DOBLE DE CICLORUTA UN ### 327,947 327,920 327,994 328,089 327,988 328,129 328,069 327,914 327,994 327,866
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN ### 515,195 515,066 515,422 515,875 515,389 516,069 515,778 515,033 515,422 514,807
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN ### 245,087 245,060 245,134 245,228 245,127 245,269 245,208 245,053 245,134 245,006
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN ### 260,291 260,264 260,338 260,432 260,331 260,473 260,412 260,257 260,338 260,210
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN ### 271,804 271,777 271,851 271,945 271,844 271,986 271,925 271,770 271,851 271,723
7.8 TACHAS REFLECTIVAS UN ### 14,150 14,150 14,150 14,150 14,150 14,150 14,150 14,150 14,150 14,150
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN ### p 15,111 15,111 15,111 15,111 15,111 15,111 15,111 15,111 15,111 15,111
i
7.10 TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M UN ### o 123,100 123,100 123,100 123,100 123,100 123,100 123,100 123,100 123,100 123,100
(INCLUYE SUMINISTRO E INSTALACIÓN)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
VÍAS (SEGÚNp ESPECIFICACIONES TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES i
o
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y
1.1 201 P RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537 157,537

DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO


1.2 201 P DE SOBRANTES A UNA DISTANCIA DE 5KM) M3 ### 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330 55,330

DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO


1.3 200.1 DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671 2,691,671

DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE


1.4 200.2 CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
HA ### 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634 968,634

DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE


1.5 201.7 SOBRANTES A UNA DISTANCIA DE 5KM)
M3 ### 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264 92,264

TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,


1.6 *** PRESTAMOS, SOBREACARREOS Y DERRUMBES ###
M3-KM 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352 1,352

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 PRÉSTAMOS
M3 ### 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822 9,822

EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y


2.2 210.2.1 PRÉSTAMOS
M3 ### 36,292 36,292 36,292 36,292 36,292 36,292 36,292 36,292 36,292 36,292

EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN,


2.3 210.2.2 CANALES Y PRÉSTAMOS M3 ### 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002 9,002

2.4 220.1 TERRAPLENES M3 ### 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362 15,362
2.5 221.1 PEDRAPLÉN COMPACTO M3 ### 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423 13,423
2.6 221.2 PEDRAPLÉN SUELTO M3 ### 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710 7,710
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 EXISTENTE
M2 ### 494 494 494 494 494 494 494 494 494 494

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO


2.8 230.2 ÚNICAMENTE MATERIAL ADICIONADO
M3 ### 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186 13,186

EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE


2.9 600.1 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521 21,521

EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE


2.10 600.2 SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 66,781 66,781 66,781 66,781 66,781 66,781 66,781 66,781 66,781 66,781

EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO


2.11 600.3 DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
M3 ### 81,947 81,947 81,947 81,947 81,947 81,947 81,947 81,947 81,947 81,947

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE


2.12 600.4 RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) M3 ### 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561 19,561

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO


2.13 600.4 P (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 M3 ### 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639 41,639
KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA


2.14 600.5 (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 M3 ### 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090 32,090
KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A


2.15 600.5 P MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA M3 ### 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302 56,302
MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 ### 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552 5,552
3.2 320.1 SUBBASE GRANULAR M3 ### 108,228 122,289 120,531 159,198 141,622 127,561 113,501 122,289 134,592 109,985
3.3 330.1 BASE GRANULAR M3 ### 108,875 122,936 121,179 159,846 142,270 128,209 114,148 122,936 135,239 115,423
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE p
3.4 365.1 (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
M3 ###
i 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132 143,132
o
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 ### 3,353 3,353 3,353 3,353 3,353 3,353 3,353 3,353 3,353 3,353
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 ### 1,162 1,162 1,162 1,162 1,162 1,162 1,162 1,162 1,162 1,162
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
3.7 461.1 ASFÁLTICA
M3 ### 228,630 228,003 229,729 231,926 229,572 232,867 231,455 227,846 229,729 226,747
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 ### 68,428 68,240 68,757 69,415 68,710 69,697 69,274 68,193 68,757 67,864
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P ASFÁLTICO)
M3 ### 727,789 717,649 724,409 753,139 736,239 771,729 758,209 722,719 734,549 705,819

MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO


3.10 450.2 P ASFÁLTICO)
M3 ### 735,466 725,326 732,086 760,816 743,916 779,406 765,886 698,286 688,146 713,496

MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE


3.11 450.9 P CEMENTO ASFÁLTICO)
M3 ### 774,623 764,483 771,243 799,973 783,073 818,563 805,043 737,443 727,303 752,653

MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO


3.12 450.3 P ASFÁLTICO) M3 ### 750,818 740,678 747,438 776,168 759,268 794,758 781,238 713,638 703,498 728,848
3,12(1) 442 MEZCLA ASFALTICA NATURAL M3 ### 384,025 359,550 349,192 346,378 335,209 367,361 370,294 375,058 388,516 367,618
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 ### 263,217 277,278 275,521 314,188 296,612 282,551 268,490 277,278 289,581 269,766
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 ### 261,333 275,394 273,637 312,304 294,728 280,667 266,606 275,394 287,697 263,091
3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 ### 40,086 40,086 40,086 40,086 40,086 40,086 40,086 40,086 40,086 40,086
3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 ### 178,102 178,102 178,102 178,102 178,102 178,102 178,102 178,102 178,102 178,102
3.15 311.1 AFIRMADO M3 ### 83,045 71,691 78,721 99,813 91,025 108,601 105,085 64,661 64,661 64,661
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 ### 11,789 11,745 11,866 12,021 11,855 12,087 11,988 11,734 11,866 11,657
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 ### 4,715 4,693 4,753 4,830 4,748 4,863 4,814 4,687 4,753 4,649

CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO


3.18 500.1 DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 642,980 640,029 648,145 658,476 647,407 662,903 656,262 639,291 648,145 634,125

CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO


3.19 500.1 DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
M3 ### 675,446 672,363 680,843 691,636 680,072 696,261 689,323 671,592 680,843 666,195

CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO


3.20 500.1 DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN M3 ### 697,065 693,894 702,616 713,717 701,823 718,475 711,338 693,101 702,616 687,549

SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO


3.21 *** (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y ML ### 7,419 7,419 7,419 7,419 7,419 7,419 7,419 7,419 7,419 7,419
SELLANTE)
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 ### 93,462 105,360 103,872 136,591 121,719 109,821 97,924 105,360 115,770 94,949

4 NORMA INV OBRAS DE ARTE


4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 ### 927,730 924,383 933,590 945,308 932,752 950,330 942,797 923,546 933,590 917,686
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 ### 794,920 791,628 800,682 812,206 799,859 817,145 809,736 790,805 800,682 785,042
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 ### 842,683 839,261 848,674 860,654 847,818 865,789 858,087 838,406 848,674 832,414
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 ### 570,517 567,492 575,813 586,402 575,056 590,941 584,132 566,736 575,813 561,441
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 ### 670,661 667,516 676,166 687,174 675,380 691,893 684,815 666,730 676,166 661,225
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 ### 567,638 564,524 573,089 583,990 572,310 588,661 581,654 563,745 573,089 558,294
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 ### 667,667 664,430 673,334 684,667 672,525 689,523 682,238 663,621 673,334 657,954
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 ### 733,209 730,095 738,660 749,561 737,881 754,232 747,225 729,316 738,660 723,865
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 ### 586,840 583,603 592,507 603,840 591,697 608,696 601,411 582,793 592,507 577,126
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 ### 778,528 775,291 784,195 795,528 783,386 800,384 793,099 774,482 784,195 768,815
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y
4.11 650 P MONTAJE DE ACERO A-36 KG ### 12,435 12,435 12,435 12,435 12,435 12,435 12,435 12,435 12,435 12,435
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y
4.12 650 P MONTAJE DE ACERO A-588 GRADO B
KG ### 15,934 15,934 15,934 15,934 15,934 15,934 15,934 15,934 15,934 15,934
4.13 641.1 ACERO DE PREESFUERZO ###
TON-M 1,871 1,871 1,871 1,871 1,871 1,871 1,871 1,871 1,871 1,871

PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,


4.14 621.1 CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
ML ### 2,792,972 2,792,972 2,792,972 2,792,972 2,792,972 2,792,972 2,792,972 2,792,972 2,792,972 2,792,972
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
i
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. p
4.15 621.1 P CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN ML ###
i 4,262,466 4,256,741 4,272,489 4,292,533 4,271,057 4,301,123 4,288,237 4,255,308 4,272,489 4,245,285
CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)
o
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4.16 621.2 REFUERZO) M3 ### 1,761,745 1,758,662 1,767,142 1,777,935 1,766,371 1,782,560 1,775,622 1,757,891 1,767,142 1,752,494
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS ###
U(DM3) 91,173 91,173 91,173 91,173 91,173 91,173 91,173 91,173 91,173 91,173
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML ### 372,943 372,573 373,591 374,886 373,498 375,441 374,609 372,481 373,591 371,833
4.19 632 P BARANDA METÁLICA ML ### 442,197 442,197 442,197 442,197 442,197 442,197 442,197 442,197 442,197 442,197
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN ### 17,723 17,723 17,723 17,723 17,723 17,723 17,723 17,723 17,723 17,723
CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL
4.21 671.1 LUGAR
M3 ### 482,230 471,976 485,287 509,700 492,041 520,009 510,494 466,833 476,634 461,116
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 ### 103,483 115,380 113,893 146,611 131,739 119,842 107,944 115,380 125,791 104,970
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 ### 86,654 76,920 83,409 102,878 94,766 110,990 107,745 70,430 70,430 70,430
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 ### 371,242 367,973 376,966 388,411 376,148 393,317 385,959 367,155 376,966 361,431
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.25 630.7 BASES M3 ### 363,546 365,930 370,732 389,429 376,735 382,608 373,911 365,444 375,058 358,258
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.26 630.7 ELEVACIONES
M3 ### 372,217 374,601 379,403 398,100 385,406 391,279 382,582 374,115 383,729 366,929

4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 ### 378,631 381,055 385,747 404,306 391,761 397,426 388,817 380,579 390,074 373,463

4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 ### 387,302 389,726 394,418 412,977 400,432 406,097 397,488 389,250 398,745 382,134
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 ### 514,720 511,517 520,326 531,538 519,525 536,344 529,135 510,716 520,326 505,110
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 ### 612,888 609,558 618,716 630,372 617,884 635,368 627,875 608,726 618,716 602,897
4.31 681.1 GAVIÓN M3 ### 186,132 197,489 196,069 227,300 213,104 201,747 190,391 197,489 207,426 187,551
4.32 681.1 GAVIÓN MALLA PVC M3 ### 190,472 201,829 200,409 231,640 217,444 206,087 194,731 201,829 211,766 191,891
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO
4.33 672.1 CLASE E, 2500 PSI
ML ### 42,796 42,599 43,140 43,828 43,091 44,123 43,681 42,550 43,140 42,206
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO
4.34 672.1 CLASE E, 2500 PSI ML ### 16,271 16,173 16,443 16,787 16,419 16,935 16,714 16,148 16,443 15,976
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE
4.35 *** REFUERZO (RESISTENCIA ÚLTIMA 25 KN)
M2 ### 10,587 10,587 10,587 10,587 10,587 10,587 10,587 10,587 10,587 10,587
SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-
4.36 *** 50 M2 ### 15,068 15,068 15,068 15,068 15,068 15,068 15,068 15,068 15,068 15,068
SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-
4.37 *** 75 M2 ### 20,255 20,255 20,255 20,255 20,255 20,255 20,255 20,255 20,255 20,255
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE
4.38 *** REFUERZO (RESISTENCIA ÚLTIMA 100 KN)
M2 ### 24,269 24,269 24,269 24,269 24,269 24,269 24,269 24,269 24,269 24,269

SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE


4.39 *** REFUERZO (RESISTENCIA ÚLTIMA 165 KN)
M2 ### 31,166 31,166 31,166 31,166 31,166 31,166 31,166 31,166 31,166 31,166

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800


4.40 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 7,598 7,598 7,598 7,598 7,598 7,598 7,598 7,598 7,598 7,598

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000


4.41 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 8,652 8,652 8,652 8,652 8,652 8,652 8,652 8,652 8,652 8,652

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500


4.42 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 8,991 8,991 8,991 8,991 8,991 8,991 8,991 8,991 8,991 8,991

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700


4.43 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 6,419 6,419 6,419 6,419 6,419 6,419 6,419 6,419 6,419 6,419

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100


4.44 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 9,643 9,643 9,643 9,643 9,643 9,643 9,643 9,643 9,643 9,643

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400


4.45 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 7,872 7,872 7,872 7,872 7,872 7,872 7,872 7,872 7,872 7,872

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400


4.46 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 ### 9,643 9,643 9,643 9,643 9,643 9,643 9,643 9,643 9,643 9,643

SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000


4.47 *** (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
M2 ### 18,485 18,485 18,485 18,485 18,485 18,485 18,485 18,485 18,485 18,485
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2019)
M
u PROVINCIA: UBATE
n
ESTOS PRECIOS iCONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM DESCRIPCIÓN UNIDAD cCarmen_Carupa Cucunubá Fúquene Guachetá Lenguazaque Simijaca Susa Sutatausa Tausa Ubate
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO
i
4.48 661.1 REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA
ML ### p 657,935 657,890 658,013 658,168 658,002 658,235 658,135 657,879 658,013 657,801
i
4.49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, ML ### o 371,396 370,695 372,624 375,079 372,448 376,131 374,553 370,519 372,624 369,291
DIÁMETRO 600 MM
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-
4.50 *** ALCANTARILLADO, DIÁMETRO 36"
ML ### 920,660 920,660 920,660 920,660 920,660 920,660 920,660 920,660 920,660 920,660

4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 ### 153,899 142,981 149,741 170,021 161,571 178,471 175,091 136,221 136,221 136,221

SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO


4.52 640.1 60000 PSI
KG ### 4,627 4,627 4,627 4,627 4,627 4,627 4,627 4,627 4,627 4,627

GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO


4.53 *** E INSTALACIÓN) ML ### 89,584 89,584 89,584 89,584 89,584 89,584 89,584 89,584 89,584 89,584

GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO


4.54 *** E INSTALACIÓN)
ML ### 136,481 136,481 136,481 136,481 136,481 136,481 136,481 136,481 136,481 136,481
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 ### 520,918 517,588 526,746 538,402 525,914 543,398 535,904 516,755 526,746 510,927
4.56 682.1 P COLCHONETA RENO M3 ### 202,927 214,284 212,864 244,096 229,900 218,543 207,186 214,284 224,221 204,347
4.57 *** TRINCHO EN MADERA M2 ### 70,925 70,925 70,925 70,925 70,925 70,925 70,925 70,925 70,925 70,925

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML ### 4,216 4,216 4,216 4,216 4,216 4,216 4,216 4,216 4,216 4,216
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 ### 45,306 45,306 45,306 45,306 45,306 45,306 45,306 45,306 45,306 45,306
5.3 730.3 TOPE DEFENSA METÁLICA UN ### 87,400 87,400 87,400 87,400 87,400 87,400 87,400 87,400 87,400 87,400
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN ### 72,728 72,728 72,728 72,728 72,728 72,728 72,728 72,728 72,728 72,728
5.5 730.1 DEFENSA METÁLICA ML ### 153,155 153,001 153,425 153,965 153,386 154,196 153,849 152,962 153,425 152,693
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UNIDIRECCIONALES UN ### 14,150 14,150 14,150 14,150 14,150 14,150 14,150 14,150 14,150 14,150

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 ### 866 866 866 866 866 866 866 866 866 866
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL
6.2 801.6 A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE UN ### 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847 139,847
SOBRANTES A UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE


6.3 801.7 RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA ML ### 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067 27,067
DISTANCIA DE 5 KM
6.4 211.1 REMOCIÓN DE DERRUMBES M3 ### 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552 8,552
ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE
6.5 801.1 5 KM) HA ### 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470 473,470

LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO


6.6 801.4 DE SOBRANTES A UNA DISTANCIA DE 5 KM) M2 ### 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804 1,804
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 ### 15,653 15,653 15,653 15,653 15,653 15,653 15,653 15,653 15,653 15,653
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 ### 25,355 25,355 25,355 25,355 25,355 25,355 25,355 25,355 25,355 25,355
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 ### 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.

También podría gustarte