Está en la página 1de 21

GOBERNACIÓN DE CUNDINAMARCA

LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)


PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

CONSTRUCCIÓN
1 PRELIMINARES
1.1 CAMPAMENTO 18 M2 UN 2,228,220 2,286,741 2,216,927 2,243,621 2,253,887 2,223,087 2,238,487 2,224,113 2,229,247 2,273,395
1.2 CAMPAMENTO 9 M2 UN 1,303,473 1,332,733 1,297,826 1,311,173 1,316,306 1,300,906 1,308,606 1,301,419 1,303,986 1,326,060
1.3 CERCA EN ALAMBRE DE PUA 4 HILOS ML 16,515 16,515 16,515 16,515 16,515 16,515 16,515 16,515 16,515 16,515
1.4 CERCA EN ALAMBRE DE PUA 5 HILOS ML 18,581 18,581 18,581 18,581 18,581 18,581 18,581 18,581 18,581 18,581
1.5 CERCA EN ALAMBRE DE PUA 6 HILOS ML 21,535 21,535 21,535 21,535 21,535 21,535 21,535 21,535 21,535 21,535
1.6 CERCA EN TABLA H=2.30 M ML 72,440 72,440 72,440 72,440 72,440 72,440 72,440 72,440 72,440 72,440
1.7 CERCA EN TEJA DE ZINC H=1.80 M ML 51,064 51,707 50,940 51,233 51,346 51,008 51,177 51,019 51,076 51,561
1.8 CERCA EN TELA VERDE H = 2.10 M ML 23,884 24,527 23,760 24,053 24,166 23,828 23,997 23,839 23,895 24,380
1.9 DEMOLICIÓN ESCALERAS EN CONCRETO M2 92,509 92,509 92,509 92,509 92,509 92,509 92,509 92,509 92,509 92,509
1.10 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 7,249 7,249 7,249 7,249 7,249 7,249 7,249 7,249 7,249 7,249
1.11 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 10,264 10,264 10,264 10,264 10,264 10,264 10,264 10,264 10,264 10,264
1.12 DEMOLICIÓN ENCHAPE MURO M2 7,858 7,858 7,858 7,858 7,858 7,858 7,858 7,858 7,858 7,858
1.13 DEMOLICIÓN PAÑETE MURO M2 8,499 8,499 8,499 8,499 8,499 8,499 8,499 8,499 8,499 8,499
1.14 DEMOLICIÓN CIELO RASO FALSO M2 10,263 10,263 10,263 10,263 10,263 10,263 10,263 10,263 10,263 10,263
1.15 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 10,184 10,184 10,184 10,184 10,184 10,184 10,184 10,184 10,184 10,184
1.16 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 15,317 15,317 15,317 15,317 15,317 15,317 15,317 15,317 15,317 15,317
1.17 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 20,842 20,842 20,842 20,842 20,842 20,842 20,842 20,842 20,842 20,842
1.18 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 31,105 31,105 31,105 31,105 31,105 31,105 31,105 31,105 31,105 31,105
1.19 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 45,323 45,323 45,323 45,323 45,323 45,323 45,323 45,323 45,323 45,323
1.20 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 56,120 56,120 56,120 56,120 56,120 56,120 56,120 56,120 56,120 56,120
1.21 DEMOLICIÓN PLACA MACIZA 0.15 M M2 47,075 47,075 47,075 47,075 47,075 47,075 47,075 47,075 47,075 47,075
1.22 DEMOLICIÓN PLACA MACIZA 0.20 M M2 66,120 66,120 66,120 66,120 66,120 66,120 66,120 66,120 66,120 66,120
1.23 DEMOLICIÓN PLACA MACIZA 0.25 M M2 78,285 78,285 78,285 78,285 78,285 78,285 78,285 78,285 78,285 78,285
1.24 DEMOLICIÓN PLACA MACIZA 0.30 M M2 95,940 95,940 95,940 95,940 95,940 95,940 95,940 95,940 95,940 95,940
1.25 DEMOLICIÓN PLACA PISO 0.05 M M2 10,452 10,452 10,452 10,452 10,452 10,452 10,452 10,452 10,452 10,452
1.26 DEMOLICIÓN PLACA PISO 0.10 M M2 16,868 16,868 16,868 16,868 16,868 16,868 16,868 16,868 16,868 16,868
1.27 DEMOLICIÓN PLACA PISO 0.15 M M2 25,696 25,696 25,696 25,696 25,696 25,696 25,696 25,696 25,696 25,696
1.28 DEMOLICIÓN PLACA PISO 0.20 M M2 42,195 42,195 42,195 42,195 42,195 42,195 42,195 42,195 42,195 42,195
1.29 DEMOLICIÓN VIGAS Y COLUMNAS M3 263,800 263,800 263,800 263,800 263,800 263,800 263,800 263,800 263,800 263,800
1.30 DESCAPOTE A MAQUINA E=0.20 M M2 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636
1.31 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 6,673 6,673 6,673 6,673 6,673 6,673 6,673 6,673 6,673 6,673
1.32 DESMONTE APARATOS SANITARIOS UN 23,729 23,729 23,729 23,729 23,729 23,729 23,729 23,729 23,729 23,729
1.33 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 12,932 12,932 12,932 12,932 12,932 12,932 12,932 12,932 12,932 12,932
1.34 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 12,827 12,827 12,827 12,827 12,827 12,827 12,827 12,827 12,827 12,827
1.35 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 11,865 11,865 11,865 11,865 11,865 11,865 11,865 11,865 11,865 11,865
1.36 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 11,077 11,077 11,077 11,077 11,077 11,077 11,077 11,077 11,077 11,077
1.37 DESMONTE MUROS SECOS M2 17,720 17,720 17,720 17,720 17,720 17,720 17,720 17,720 17,720 17,720
1.38 DESMONTE MARCOS Y PUERTAS UN 15,068 15,068 15,068 15,068 15,068 15,068 15,068 15,068 15,068 15,068
1.39 DESMONTE VENTANAS M2 12,932 12,932 12,932 12,932 12,932 12,932 12,932 12,932 12,932 12,932
1.40 LETRINA DE 2.0x1.0 UN 993,075 1,002,488 992,332 997,254 997,287 993,904 996,591 993,718 992,690 1,000,525
LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
1.41 M2 11,231 11,231 11,231 11,231 11,231 11,231 11,231 11,231 11,231 11,231
PRESICIÓN
1.42 REPLANTEO MANUAL DE CIMIENTOS M2 4,144 4,144 4,144 4,144 4,144 4,144 4,144 4,144 4,144 4,144
1.43 RED ELÉCTRICA PROVISIONAL L=50M UN 2,949,386 2,949,386 2,949,386 2,949,386 2,949,386 2,949,386 2,949,386 2,949,386 2,949,386 2,949,386
1.44 RED TELEFÓNICA PROVISIONAL UN 274,709 274,709 274,709 274,709 274,709 274,709 274,709 274,709 274,709 274,709
1.45 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 9,749 9,749 9,749 9,749 9,749 9,749 9,749 9,749 9,749 9,749
2 CIMIENTOS
2.1 BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 81,510 135,837 90,564 126,782 106,862 106,862 124,971 101,430 81,510 126,782
2.2 BASE ARENA CEMENTO 1:20 M3 250,894 320,074 237,544 269,100 281,236 244,826 263,032 246,040 252,108 304,296
2.3 DEMOLICIÓN CABEZAS DE PILOTES M3 335,932 335,932 335,932 335,932 335,932 335,932 335,932 335,932 335,932 335,932
2.4 DEMOLICIÓN CIMIENTO ENTERRADO M3 233,373 233,373 233,373 233,373 233,373 233,373 233,373 233,373 233,373 233,373
2.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 40,836 40,836 40,836 40,836 40,836 40,836 40,836 40,836 40,836 40,836
2.6 SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 718,943 781,839 706,805 735,495 746,529 713,426 729,978 714,529 720,047 767,496
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

2.7 VIGA DE AMARRE EN CONCRETO 3500 PSI M3 CONSTRUCCIÓN


723,423 788,924 710,783 740,660 752,152 717,678 734,915 718,827 724,573 773,986
2.8 ZAPATAS EN CONCRETO 3500 PSI M3 674,684 736,016 662,848 690,824 701,584 669,304 685,444 670,379 675,760 722,029
2.9 PILOTE DE MADERA D=20 CM ML 53,513 53,513 53,513 53,513 53,513 53,513 53,513 53,513 53,513 53,513
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
2.10 ML 165,627 165,627 165,627 165,627 165,627 165,627 165,627 165,627 165,627 165,627
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
2.11 ML 206,880 206,880 206,880 206,880 206,880 206,880 206,880 206,880 206,880 206,880
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
2.12 ML 256,768 256,768 256,768 256,768 256,768 256,768 256,768 256,768 256,768 256,768
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
2.13 ML 323,924 323,924 323,924 323,924 323,924 323,924 323,924 323,924 323,924 323,924
UNA DISTANCIA MENOR DE 5 KM)
2.14 PILOTE HINCADO 25X25 ML 132,034 136,530 131,167 133,217 134,006 131,640 132,823 131,719 132,113 135,504
2.15 PILOTE HINCADO 30X30 ML 166,860 173,375 165,603 168,575 169,718 166,289 168,003 166,403 166,974 171,889
2.16 DADOS EN CONCRETO 3500PSI M3 658,229 719,562 646,394 674,369 685,130 652,850 668,990 653,925 659,306 705,574
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
2.17 ML 99,473 99,473 99,473 99,473 99,473 99,473 99,473 99,473 99,473 99,473
MENOR DE 5 KM)
3 DESAGÜES E INSTALACIONES SUBTERRÁNEAS
3.1 SIFÓN PARA DRENAJE EN PVC DE 4" UN 42,931 43,361 42,849 43,045 43,120 42,894 43,007 42,901 42,939 43,263
3.2 SIFÓN EN PVC 6" UN 217,412 217,841 217,329 217,525 217,600 217,374 217,487 217,382 217,419 217,743
3.3 CAJA DE INSPECCIÓN DE 100X100 UN 511,194 557,240 511,219 537,438 532,085 520,890 534,746 518,786 507,438 548,260
3.4 CAJA DE INSPECCIÓN DE 40X40 UN 253,700 262,789 252,698 257,283 257,745 254,061 256,600 253,975 253,475 260,844
3.5 CAJA DE INSPECCIÓN DE 60X60 UN 288,877 303,470 287,242 294,590 295,370 289,418 293,488 289,288 288,529 300,344
3.6 CAJA DE INSPECCIÓN DE 80X80 UN 377,247 399,714 374,093 385,032 387,193 377,097 383,239 377,105 377,036 394,791
3.7 DUCTO ELÉCTRICO PVC 4" ML 119,452 119,750 119,501 119,700 119,591 119,591 119,690 119,561 119,402 119,700
3.8 POZO SÉPTICO ETERNIT 1000 LT UN 1,404,263 1,407,248 1,404,761 1,406,751 1,405,656 1,405,656 1,406,651 1,405,358 1,403,766 1,406,751
3.9 TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 131,002 135,750 130,085 132,251 133,084 130,585 131,835 130,668 131,085 134,667
3.10 TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 81,805 84,310 81,322 82,465 82,904 81,586 82,245 81,629 81,849 83,739
3.11 TUBERÍA DRENAJE PVC 110 ML 31,175 32,225 30,972 31,451 31,635 31,083 31,359 31,101 31,193 31,985
3.12 TUBERÍA DRENAJE PVC 160 ML 49,784 50,835 49,582 50,061 50,245 49,692 49,969 49,711 49,803 50,595
3.13 TUBERÍA DRENAJE PVC 200 ML 65,186 66,656 64,902 65,573 65,831 65,057 65,444 65,083 65,212 66,321
3.14 TUBERÍA DRENAJE PVC 250 ML 88,904 90,584 88,579 89,346 89,641 88,756 89,198 88,786 88,933 90,201
3.15 TUBERÍA DRENAJE PVC 315 ML 122,544 124,014 122,260 122,931 123,189 122,415 122,802 122,441 122,570 123,679
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
3.16 UN 1,051,481 1,068,282 1,048,238 1,055,902 1,058,850 1,050,007 1,054,428 1,050,302 1,051,776 1,064,451
FILTRANTE)
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
3.17 UN 1,484,358 1,517,961 1,477,873 1,493,201 1,499,096 1,481,410 1,490,253 1,482,000 1,484,948 1,510,298
FILTRANTE)
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
3.18 UN 1,933,510 2,000,717 1,920,541 1,951,197 1,962,987 1,927,614 1,945,301 1,928,794 1,934,690 1,985,390
FILTRANTE)
4 ESTRUCTURAS EN CONCRETO
4.1 CASETÓN DE LONA 0.8 X 0.35 M2 46,712 46,712 46,712 46,712 46,712 46,712 46,712 46,712 46,712 46,712
4.2 CASETÓN DE LONA 0.80X0.70 M2 61,433 61,433 61,433 61,433 61,433 61,433 61,433 61,433 61,433 61,433
4.3 COLUMNAS 3500 PSI M3 906,198 967,531 894,362 922,338 933,099 900,818 916,959 901,894 907,274 953,543
4.4 CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 272,941 318,217 264,820 283,295 297,022 268,794 288,341 269,456 274,440 313,368
ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
4.5 M2 150,908 156,863 149,759 152,475 153,520 150,386 151,953 150,490 151,013 155,505
DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
4.6 M2 137,885 145,031 136,506 139,766 141,019 137,259 139,139 137,384 138,011 143,401
DE REFUERZO, CONCRETO DE 3500 PSI

4.7 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 145,861 155,388 144,022 148,368 150,040 145,025 147,533 145,192 146,028 153,216

4.8 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 153,929 164,052 151,976 156,593 158,369 153,041 155,705 153,219 154,107 161,743

4.9 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 176,174 188,678 173,761 179,464 181,658 175,077 178,368 175,296 176,393 185,827

4.10 ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 195,888 210,179 193,130 199,649 202,156 194,634 198,395 194,885 196,139 206,920
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

CONSTRUCCIÓN
4.11 ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 217,442 233,519 214,339 221,673 224,494 216,032 220,263 216,314 217,724 229,853

4.12 ENTREPISO VIGUETA PLACA M2 110,234 111,136 110,059 110,471 110,629 110,154 110,392 110,170 110,249 110,930
4.13 ESCALERA MACIZA 3500 PSI M3 1,071,556 1,132,888 1,059,720 1,087,696 1,098,456 1,066,176 1,082,316 1,067,252 1,072,632 1,118,901
4.14 MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 105,301 106,222 105,123 105,543 105,705 105,220 105,463 105,236 105,317 106,012
4.15 ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 88,287 94,420 87,103 89,901 90,977 87,749 89,363 87,856 88,394 93,021
4.16 ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 99,331 106,834 97,883 101,306 102,622 98,673 100,648 98,805 99,463 105,123
4.17 ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 115,656 125,064 113,840 118,132 119,782 114,830 117,306 114,995 115,821 122,918
4.18 MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 795,594 856,926 783,758 811,734 822,494 790,214 806,354 791,289 796,670 842,939
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
4.19 UN 65,508 67,409 65,141 66,008 66,342 65,341 65,841 65,374 65,541 66,976
M)
4.20 PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 313,473 340,865 308,188 320,682 325,487 311,071 318,279 311,551 313,954 334,618
4.21 ACERO FIGURADO 37000 PSI KG 7,632 7,632 7,632 7,632 7,632 7,632 7,632 7,632 7,632 7,632
4.22 ACERO FIGURADO 60000 PSI KG 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086
4.23 REFUERZO MALLA ELECTROSOLDADA KG 10,036 10,036 10,036 10,036 10,036 10,036 10,036 10,036 10,036 10,036
4.24 TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 964,972 1,026,304 953,136 981,112 991,872 959,592 975,732 960,668 966,048 1,012,317
4.25 TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 875,813 942,931 862,861 893,476 905,251 869,926 887,589 871,103 876,991 927,624
4.26 VIGA AÉREA 3500 PSI M3 959,054 1,020,386 947,218 975,194 985,954 953,674 969,814 954,750 960,130 1,006,399
4.27 VIGA CINTA 3500 PSI M3 935,670 997,002 923,834 951,810 962,571 930,290 946,430 931,366 936,746 983,015
4.28 VIGA CANAL EN CONCRETO 3500 PSI M3 1,179,687 1,241,019 1,167,851 1,195,827 1,206,587 1,174,307 1,190,447 1,175,382 1,180,763 1,227,032
4.29 BASE EN CONCRETO POBRE 1500 PSI M3 359,180 426,154 346,256 376,806 388,555 353,305 370,930 354,480 360,355 410,880
5 MAMPOSTERÍA
5.1 ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 36,377 38,074 36,049 36,824 37,121 36,228 36,675 36,258 36,407 37,687
5.2 ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 60,834 62,532 60,507 61,281 61,579 60,686 61,132 60,715 60,864 62,145
5.3 ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 39,955 40,385 39,872 40,068 40,143 39,917 40,030 39,925 39,962 40,287
5.4 ARCOS EN LADRILLO PRENSADO ML 186,346 187,205 186,180 186,572 186,723 186,271 186,497 186,286 186,361 187,009
5.5 DINTELES CONCRETO DE 2500 PSI 15x20 ML 59,250 61,152 58,883 59,751 60,084 59,083 59,584 59,117 59,284 60,718
5.6 DINTELES EN BLOQUE 0.15 M ML 35,078 35,998 34,900 35,320 35,481 34,997 35,239 35,013 35,094 35,788
5.7 ENCHAPES LADRILLO PRENSADO M2 110,683 112,401 110,351 111,135 111,436 110,532 110,984 110,562 110,713 112,009
5.8 MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 126,665 133,004 125,441 128,333 129,445 126,109 127,777 126,220 126,776 131,558
5.9 MURO DRYWALL DOBLE CARA 0.12 M M2 102,345 102,345 102,345 102,345 102,345 102,345 102,345 102,345 102,345 102,345
5.10 MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 60,387 60,387 60,387 60,387 60,387 60,387 60,387 60,387 60,387 60,387
5.11 MURO DRYWALL DOBLE CARA 0.10 M M2 98,658 98,658 98,658 98,658 98,658 98,658 98,658 98,658 98,658 98,658
5.12 MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 58,544 58,544 58,544 58,544 58,544 58,544 58,544 58,544 58,544 58,544
5.13 MURO SUPERBOARD DOBLE CARA 0.10 M M2 118,238 118,238 118,238 118,238 118,238 118,238 118,238 118,238 118,238 118,238
5.14 MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 69,871 69,871 69,871 69,871 69,871 69,871 69,871 69,871 69,871 69,871
5.15 MURO SUPERBOARD DOBLE CARA 0.12 M M2 130,748 130,748 130,748 130,748 130,748 130,748 130,748 130,748 130,748 130,748
5.16 MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 76,125 76,125 76,125 76,125 76,125 76,125 76,125 76,125 76,125 76,125
5.17 MURO EN BLOQUE Nº 5 E=0.12 M M2 46,074 46,938 45,907 46,301 46,453 45,998 46,226 46,013 46,089 46,741
5.18 MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 28,054 28,485 27,970 28,167 28,243 28,016 28,129 28,023 28,061 28,387
5.19 MURO EN BLOQUE DE CONCRETO 0.10 M M2 59,311 59,887 59,200 59,462 59,563 59,260 59,412 59,270 59,321 59,755
5.20 MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 35,911 36,199 35,855 35,987 36,037 35,886 35,962 35,891 35,916 36,133
5.21 MURO EN BLOQUE DE CONCRETO 0.12 M M2 66,713 67,289 66,602 66,865 66,966 66,663 66,814 66,673 66,724 67,158
5.22 MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 40,396 40,683 40,340 40,471 40,522 40,370 40,446 40,375 40,401 40,618
5.23 MURO EN BLOQUE DE CONCRETO 0.20 M M2 111,899 114,778 111,344 112,657 113,162 111,647 112,405 111,697 111,950 114,122
5.24 MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 66,508 67,947 66,230 66,887 67,139 66,382 66,760 66,407 66,533 67,619
5.25 MURO EN BLOQUE Nº 4 E= 0.10 M M2 42,182 42,758 42,071 42,334 42,435 42,132 42,283 42,142 42,192 42,627
5.26 MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 25,721 26,008 25,665 25,796 25,847 25,695 25,771 25,700 25,726 25,943
5.27 MURO EN BLOQUE Nº 5 E=0.23 M M2 83,589 84,740 83,366 83,892 84,094 83,488 83,791 83,508 83,609 84,478
5.28 MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 50,704 51,279 50,593 50,855 50,956 50,653 50,805 50,663 50,714 51,148
5.29 MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 97,870 98,790 97,692 98,112 98,274 97,789 98,031 97,805 97,886 98,580
5.30 MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 59,795 60,255 59,706 59,916 59,997 59,754 59,875 59,762 59,803 60,150
5.31 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 203,796 207,827 203,019 204,857 205,564 203,443 204,503 203,514 203,867 206,908
5.32 MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 123,289 125,304 122,900 123,819 124,173 123,112 123,642 123,147 123,324 124,844
5.33 MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 99,350 100,566 99,115 99,670 99,883 99,243 99,563 99,265 99,371 100,288
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

5.34 MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML CONSTRUCCIÓN


60,535 61,143 60,417 60,695 60,801 60,481 60,641 60,492 60,545 61,004
5.35 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 53,067 54,356 52,818 53,406 53,633 52,954 53,293 52,977 53,090 54,062
5.36 MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 32,463 33,107 32,338 32,632 32,746 32,406 32,576 32,418 32,474 32,960
5.37 MURO TOLETE COMÚN 0.06 M M2 38,291 38,867 38,180 38,443 38,544 38,241 38,392 38,251 38,301 38,736
5.38 MURO TOLETE COMÚN 0.06 M (LINEAL) ML 23,455 23,743 23,399 23,531 23,581 23,430 23,506 23,435 23,460 23,677
5.39 MURO TOLETE COMÚN 0.12 M M2 57,522 58,673 57,300 57,825 58,027 57,421 57,724 57,441 57,542 58,411
5.40 MURO TOLETE COMÚN 0.12 M (LINEAL) ML 35,484 36,059 35,373 35,635 35,736 35,433 35,585 35,443 35,494 35,928
5.41 MURO TOLETE COMÚN 0.25 M M2 110,467 112,195 110,134 110,922 111,225 110,316 110,770 110,346 110,497 111,801
5.42 MURO TOLETE COMÚN 0.25 M (LINEAL) ML 67,733 68,597 67,566 67,960 68,112 67,657 67,884 67,672 67,748 68,400
5.43 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 80,677 81,828 80,454 80,980 81,182 80,576 80,879 80,596 80,697 81,565
5.44 MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 49,000 49,576 48,889 49,152 49,253 48,950 49,101 48,960 49,010 49,445
5.45 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 170,036 174,066 169,258 171,097 171,804 169,682 170,743 169,753 170,107 173,147
5.46 MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 104,025 106,040 103,636 104,555 104,909 103,848 104,379 103,884 104,060 105,581
5.47 REMATES LADRILLO PRENSADO ML 35,926 36,355 35,843 36,039 36,114 35,888 36,001 35,895 35,933 36,257
5.48 SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 40,460 41,335 40,292 40,691 40,844 40,384 40,614 40,399 40,476 41,136
5.49 SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 68,511 69,677 68,285 68,817 69,022 68,408 68,715 68,429 68,531 69,411
5.50 LAVADA DE FACHADA M2 6,341 6,341 6,341 6,341 6,341 6,341 6,341 6,341 6,341 6,341
5.51 PASAMANOS EN CONCRETO 2500 PSI ML 61,245 62,943 60,918 61,692 61,990 61,096 61,543 61,126 61,275 62,556
5.52 DOVELA, GROUTING 3000 PSI ML 12,655 12,655 12,655 12,655 12,655 12,655 12,655 12,655 12,655 12,655
5.53 ANCLAJE 3/8" L=30CM UN 17,477 17,477 17,477 17,477 17,477 17,477 17,477 17,477 17,477 17,477
5.54 ANCLAJE 1/2" L=50CM UN 24,224 24,224 24,224 24,224 24,224 24,224 24,224 24,224 24,224 24,224
5.55 ANCLAJE 5/8" L=70CM UN 33,808 33,808 33,808 33,808 33,808 33,808 33,808 33,808 33,808 33,808
5.56 ANCLAJE 3/4" L=70CM UN 51,484 51,484 51,484 51,484 51,484 51,484 51,484 51,484 51,484 51,484
5.57 ANCLAJE 1" L= 70CM UN 5,575 6,031 5,487 5,695 5,775 5,535 5,655 5,543 5,583 5,927

6 PAÑETES, REVOQUES Y REPELLOS


6.1 ENTRAMADO MADERA CIELO RASO M2 18,551 18,551 18,551 18,551 18,551 18,551 18,551 18,551 18,551 18,551
6.2 FILOS O DILATACIONES B/PLACA ML 6,796 7,226 6,713 6,909 6,984 6,758 6,871 6,766 6,803 7,128
6.3 FILOS O DILATACIONES S/MURO ML 8,175 8,605 8,092 8,288 8,363 8,137 8,250 8,145 8,182 8,507
6.4 GOTERA EN MORTERO 1:4 ML 9,594 10,023 9,511 9,707 9,782 9,556 9,669 9,563 9,601 9,925
6.5 IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 7,632 7,632 7,632 7,632 7,632 7,632 7,632 7,632 7,632 7,632
6.6 MALLA BAJO ENTRAMADO M2 15,625 15,625 15,625 15,625 15,625 15,625 15,625 15,625 15,625 15,625
6.7 PAÑETE BAJO GUADUA 1:5, E=2 CM M2 27,465 28,316 27,301 27,689 27,838 27,391 27,615 27,405 27,480 28,122
6.8 PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 16,749 17,175 16,667 16,861 16,936 16,712 16,824 16,719 16,757 17,078
6.9 PAÑETE BAJO MALLA 1:4, E=2 CM M2 24,650 25,859 24,417 24,968 25,180 24,544 24,862 24,565 24,671 25,583
6.10 PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 14,981 15,585 14,864 15,140 15,246 14,928 15,087 14,938 14,991 15,448
6.11 PAÑETE BAJO MALLA 1:5, E=2 CM M2 22,940 23,791 22,776 23,164 23,314 22,866 23,090 22,881 22,955 23,597
6.12 PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 14,126 14,552 14,044 14,238 14,313 14,089 14,201 14,096 14,134 14,455
6.13 PAÑETE CULATAS 1:4, E=2 CM M2 24,650 25,859 24,417 24,968 25,180 24,544 24,862 24,565 24,671 25,583
6.14 PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 14,981 15,585 14,864 15,140 15,246 14,928 15,087 14,938 14,991 15,448
6.15 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 24,214 24,820 24,097 24,373 24,480 24,160 24,320 24,171 24,224 24,682
6.16 PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 14,761 15,065 14,703 14,841 14,894 14,735 14,815 14,740 14,767 14,995
6.17 PAÑETE LISO MUROS 1:4, E=1.5 CM M2 20,505 21,426 20,327 20,747 20,909 20,424 20,666 20,440 20,521 21,216
6.18 PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 12,573 13,033 12,484 12,694 12,775 12,532 12,654 12,540 12,581 12,928
6.19 PAÑETE LISO MUROS 1:5, E=1.5 CM M2 19,202 19,851 19,077 19,373 19,486 19,145 19,316 19,157 19,213 19,703
6.20 PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 11,922 12,246 11,859 12,007 12,064 11,893 11,978 11,899 11,927 12,172
6.21 PAÑETE LISO PLACAS 1:4, E=2 CM M2 25,555 26,764 25,322 25,873 26,085 25,449 25,767 25,470 25,576 26,488
6.22 PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 15,410 16,015 15,293 15,569 15,675 15,357 15,516 15,368 15,421 15,877
6.23 PAÑETE LISO PLACAS 1:5, E=2 CM M2 23,845 24,696 23,681 24,069 24,219 23,771 23,995 23,786 23,860 24,502
6.24 PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 14,555 14,981 14,473 14,667 14,742 14,518 14,630 14,525 14,563 14,884
6.25 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 19,912 20,560 19,787 20,083 20,196 19,855 20,026 19,866 19,923 20,412
6.26 PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 12,256 12,580 12,193 12,341 12,398 12,227 12,313 12,233 12,261 12,506
6.27 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 24,880 25,731 24,715 25,103 25,253 24,805 25,029 24,820 24,894 25,537
6.28 PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 15,543 15,968 15,460 15,655 15,729 15,505 15,617 15,513 15,550 15,871
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

CONSTRUCCIÓN
7 CUBIERTAS
7.1 AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 31,336 33,063 31,002 31,790 32,093 31,184 31,639 31,214 31,366 32,669
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
7.2 M2 100,027 103,196 99,415 100,861 101,417 99,749 100,583 99,804 100,082 102,473
(INCLUYE TELA IMPERMEABLE)
7.3 BAJANTE PVC (AMAZONAS, RAINGO) ML 61,170 61,170 61,170 61,170 61,170 61,170 61,170 61,170 61,170 61,170
7.4 BAJANTE PVC AGUAS LLUVIAS D=3" ML 24,929 24,929 24,929 24,929 24,929 24,929 24,929 24,929 24,929 24,929
7.5 BAJANTE PVC AGUAS LLUVIAS D=4" ML 38,909 38,909 38,909 38,909 38,909 38,909 38,909 38,909 38,909 38,909
7.6 CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 89,059 89,059 89,059 89,059 89,059 89,059 89,059 89,059 89,059 89,059
7.7 CABALLETE FIJO TEJA FIBROCEMENTO ML 69,975 69,975 69,975 69,975 69,975 69,975 69,975 69,975 69,975 69,975
7.8 CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 41,158 41,158 41,158 41,158 41,158 41,158 41,158 41,158 41,158 41,158
7.9 CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 93,284 93,284 93,284 93,284 93,284 93,284 93,284 93,284 93,284 93,284
7.10 CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 111,174 111,174 111,174 111,174 111,174 111,174 111,174 111,174 111,174 111,174
7.11 CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 162,869 162,869 162,869 162,869 162,869 162,869 162,869 162,869 162,869 162,869
7.12 CABALLETE CUBIERTA TERMOACÚSTICA ML 65,158 65,158 65,158 65,158 65,158 65,158 65,158 65,158 65,158 65,158
7.13 CANAL PVC AMAZONAS ML 90,989 90,989 90,989 90,989 90,989 90,989 90,989 90,989 90,989 90,989
7.14 CANAL PVC RAINGO ML 82,921 82,921 82,921 82,921 82,921 82,921 82,921 82,921 82,921 82,921
7.15 TEJA CANALETA 43 FIBROCEMENTO L=6M M2 145,236 145,236 145,236 145,236 145,236 145,236 145,236 145,236 145,236 145,236
7.16 TEJA CANALETA 90 FIBROCEMENTO L=6M M2 84,561 84,561 84,561 84,561 84,561 84,561 84,561 84,561 84,561 84,561
7.17 TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 62,351 62,351 62,351 62,351 62,351 62,351 62,351 62,351 62,351 62,351
7.18 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 36,424 36,424 36,424 36,424 36,424 36,424 36,424 36,424 36,424 36,424
7.19 TEJA DE BARRO M2 67,859 70,007 67,444 68,424 68,801 67,670 68,236 67,708 67,896 69,517
7.20 TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,948
7.21 TEJA EN LÁMINA GALVANIZADA CAL 26 M2 47,683 47,683 47,683 47,683 47,683 47,683 47,683 47,683 47,683 47,683
7.22 TEJA FIBROCEMENTO Nº4 M2 40,890 40,890 40,890 40,890 40,890 40,890 40,890 40,890 40,890 40,890
7.23 TEJA FIBROCEMENTO No. 6 M2 39,980 39,980 39,980 39,980 39,980 39,980 39,980 39,980 39,980 39,980
7.24 TEJA FIBROCEMENTO No. 8 M2 40,272 40,272 40,272 40,272 40,272 40,272 40,272 40,272 40,272 40,272
7.25 TEJA TERMOACÚSTICA M2 56,127 56,127 56,127 56,127 56,127 56,127 56,127 56,127 56,127 56,127
7.26 TEJA PLÁSTICA No.6 M2 49,480 49,480 49,480 49,480 49,480 49,480 49,480 49,480 49,480 49,480
7.27 TEJA ESPAÑOLA ETERNIT M2 89,791 89,791 89,791 89,791 89,791 89,791 89,791 89,791 89,791 89,791
7.28 TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 164,837 164,837 164,837 164,837 164,837 164,837 164,837 164,837 164,837 164,837
7.29 TEJA SIN TRASLAPO M2 74,464 74,464 74,464 74,464 74,464 74,464 74,464 74,464 74,464 74,464
7.30 ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 48,281 48,281 48,281 48,281 48,281 48,281 48,281 48,281 48,281 48,281
7.31 ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 37,573 37,573 37,573 37,573 37,573 37,573 37,573 37,573 37,573 37,573
ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
7.32 M2 65,358 65,358 65,358 65,358 65,358 65,358 65,358 65,358 65,358 65,358
ESTRUCTURAL ABIERTO 4"x2", 15 MM)
7.33 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 22,776 22,776 22,776 22,776 22,776 22,776 22,776 22,776 22,776 22,776
7.34 FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 27,175 27,175 27,175 27,175 27,175 27,175 27,175 27,175 27,175 27,175
7.35 MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 37,148 37,148 37,148 37,148 37,148 37,148 37,148 37,148 37,148 37,148
7.36 MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 48,974 48,974 48,974 48,974 48,974 48,974 48,974 48,974 48,974 48,974
7.37 BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 24,964 24,964 24,964 24,964 24,964 24,964 24,964 24,964 24,964 24,964
7.38 CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 58,625 58,625 58,625 58,625 58,625 58,625 58,625 58,625 58,625 58,625
7.39 DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 388,464 388,464 388,464 388,464 388,464 388,464 388,464 388,464 388,464 388,464
7.40 CUBIERTA EN POLICARBONATO ALVEOLAR M2 459,838 459,838 459,838 459,838 459,838 459,838 459,838 459,838 459,838 459,838
7.41 CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 299,200 299,200 299,200 299,200 299,200 299,200 299,200 299,200 299,200 299,200
7.42 CORTASOL CELOSIA C-23 EN ALUZINC M2 318,533 318,533 318,533 318,533 318,533 318,533 318,533 318,533 318,533 318,533
7.43 TEJA TERMOACUSTICA TRAPEZOIDAL A360 M2 70,030 70,030 70,030 70,030 70,030 70,030 70,030 70,030 70,030 70,030
7.44 TEJA TERMOACUSTICA ONDULADA M2 67,787 67,787 67,787 67,787 67,787 67,787 67,787 67,787 67,787 67,787
7.45 TEJA TERMOACUSTICA MADRILEÑA M2 94,953 94,953 94,953 94,953 94,953 94,953 94,953 94,953 94,953 94,953
8 MORTEROS Y CONCRETOS
8.1 CONCRETO 4000 PSI M3 503,435 568,586 490,863 520,580 532,010 497,720 514,865 498,863 504,579 553,728
8.2 CONCRETO 3500 PSI M3 439,782 499,328 428,291 455,452 465,899 434,559 450,229 435,603 440,827 485,748
8.3 CONCRETO 3000 PSI M3 437,267 498,332 425,483 453,337 464,050 431,911 447,981 432,982 438,339 484,406
8.4 CONCRETO 2500 PSI M3 390,928 454,319 378,696 407,610 418,731 385,368 402,049 386,479 392,041 439,862
8.5 CONCRETO 2000 PSI M3 364,679 428,967 352,273 381,597 392,876 359,040 375,958 360,168 365,808 414,305
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

8.6 CONCRETO 1500 PSI M3 CONSTRUCCIÓN


331,146 396,169 318,598 348,258 359,665 325,442 342,554 326,583 332,287 381,340
8.7 MORTERO SECO 1:10 M3 294,092 353,390 282,649 309,697 320,100 288,891 304,496 289,932 295,133 339,866
8.8 MORTERO 1:4 ARENA LAVADA DE PEÑA M3 527,383 584,962 516,272 542,536 552,637 522,333 537,485 523,343 528,393 571,830
8.9 MORTERO 1:5 ARENA LAVADA DE PEÑA M3 445,973 486,501 438,151 456,638 463,748 442,417 453,083 443,129 446,683 477,258
8.10 MORTERO 1:3 ARENA LAVADA DE PEÑA M3 513,351 551,255 506,036 523,326 529,975 510,025 520,000 510,691 514,015 542,610
8.11 MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 759,191 797,095 751,876 769,166 775,815 755,865 765,840 756,531 759,855 788,450

9 CARPINTERÍA EN MADERA
9.1 BARANDA EN MADERA CEDRO MACHO ML 136,838 136,838 136,838 136,838 136,838 136,838 136,838 136,838 136,838 136,838
9.2 CHAZOS PARA CARPINTERÍA EN MADERA UN 4,668 5,097 4,585 4,781 4,856 4,630 4,743 4,638 4,675 4,999
9.3 DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 153,951 153,951 153,951 153,951 153,951 153,951 153,951 153,951 153,951 153,951
9.4 DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 187,605 187,605 187,605 187,605 187,605 187,605 187,605 187,605 187,605 187,605
9.5 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 269,167 269,167 269,167 269,167 269,167 269,167 269,167 269,167 269,167 269,167
9.6 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 299,372 299,372 299,372 299,372 299,372 299,372 299,372 299,372 299,372 299,372
9.7 MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 329,614 329,614 329,614 329,614 329,614 329,614 329,614 329,614 329,614 329,614
9.8 HOJA PUERTA FORTEC 0.81 UN 218,381 218,381 218,381 218,381 218,381 218,381 218,381 218,381 218,381 218,381
9.9 HOJA PUERTA FORTEC 0.91 UN 247,414 247,414 247,414 247,414 247,414 247,414 247,414 247,414 247,414 247,414
9.10 HOJA PUERTA FORTEC 1.50 UN 363,543 363,543 363,543 363,543 363,543 363,543 363,543 363,543 363,543 363,543
9.11 HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 138,542 138,542 138,542 138,542 138,542 138,542 138,542 138,542 138,542 138,542
9.12 HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 183,542 183,542 183,542 183,542 183,542 183,542 183,542 183,542 183,542 183,542
9.13 HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 203,865 203,865 203,865 203,865 203,865 203,865 203,865 203,865 203,865 203,865
9.14 HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 517,414 517,414 517,414 517,414 517,414 517,414 517,414 517,414 517,414 517,414
9.15 PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 47,039 47,039 47,039 47,039 47,039 47,039 47,039 47,039 47,039 47,039
9.16 PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 29,784 29,784 29,784 29,784 29,784 29,784 29,784 29,784 29,784 29,784
9.17 VENTANERÍA EN MADERA CEDRO MACHO M2 111,286 111,286 111,286 111,286 111,286 111,286 111,286 111,286 111,286 111,286
9.18 CERRADURA DE ENTRADA PRINCIPAL UN 132,679 132,679 132,679 132,679 132,679 132,679 132,679 132,679 132,679 132,679
9.19 SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 103,211 103,211 103,211 103,211 103,211 103,211 103,211 103,211 103,211 103,211
9.20 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 32,430 32,430 32,430 32,430 32,430 32,430 32,430 32,430 32,430 32,430
9.21 SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 32,430 32,430 32,430 32,430 32,430 32,430 32,430 32,430 32,430 32,430
9.22 SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 30,775 30,775 30,775 30,775 30,775 30,775 30,775 30,775 30,775 30,775
9.23 ESPEJO INCOLORO 3 MM SIN BISELAR M2 63,781 63,781 63,781 63,781 63,781 63,781 63,781 63,781 63,781 63,781
9.24 ESPEJO BISELADO INCOLORO 4 MM M2 80,288 80,288 80,288 80,288 80,288 80,288 80,288 80,288 80,288 80,288
9.25 VIDRIO ESMERILADO INCOLORO 4 MM M2 69,966 69,966 69,966 69,966 69,966 69,966 69,966 69,966 69,966 69,966
9.26 VIDRIO ESMERILADO INCOLORO 5 MM M2 83,895 83,895 83,895 83,895 83,895 83,895 83,895 83,895 83,895 83,895
9.27 VIDRIO TEMPLADO PULIDO 10 MM M2 391,873 391,873 391,873 391,873 391,873 391,873 391,873 391,873 391,873 391,873
9.28 VIDRIO TEMPLADO PULIDO 8 MM M2 274,582 274,582 274,582 274,582 274,582 274,582 274,582 274,582 274,582 274,582
9.29 VIDRIO TRANSPARENTE 3 MM M2 37,712 37,712 37,712 37,712 37,712 37,712 37,712 37,712 37,712 37,712
9.30 VIDRIO TRANSPARENTE 4 MM M2 47,974 47,974 47,974 47,974 47,974 47,974 47,974 47,974 47,974 47,974
9.31 VIDRIO TRANSPARENTE 5 MM M2 58,237 58,237 58,237 58,237 58,237 58,237 58,237 58,237 58,237 58,237
9.32 VIDRIO TRANSPARENTE 6 MM M2 72,899 72,899 72,899 72,899 72,899 72,899 72,899 72,899 72,899 72,899

10 CARPINTERÍA METÁLICA
10.1 CAJA CONTADOR DE AGUA UN 84,760 84,760 84,760 84,760 84,760 84,760 84,760 84,760 84,760 84,760
10.2 CELOSÍA ALUMINIO 100CM X 60 CM M2 232,193 232,193 232,193 232,193 232,193 232,193 232,193 232,193 232,193 232,193
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
10.3 ML 90,293 90,293 90,293 90,293 90,293 90,293 90,293 90,293 90,293 90,293
(INCLUYE ANTICORROSIVO)
10.4 MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 163,507 163,507 163,507 163,507 163,507 163,507 163,507 163,507 163,507 163,507
10.5 MARCO TAPA CAJA DE INSPECCIÓN UN 204,764 204,764 204,764 204,764 204,764 204,764 204,764 204,764 204,764 204,764
10.6 MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 100,189 100,189 100,189 100,189 100,189 100,189 100,189 100,189 100,189 100,189
10.7 PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 235,088 235,088 235,088 235,088 235,088 235,088 235,088 235,088 235,088 235,088
10.8 PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 124,079 124,079 124,079 124,079 124,079 124,079 124,079 124,079 124,079 124,079
10.9 CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 7,587 7,587 7,587 7,587 7,587 7,587 7,587 7,587 7,587 7,587
CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
10.10 M2 116,830 116,830 116,830 116,830 116,830 116,830 116,830 116,830 116,830 116,830
TUBO ESTRUCTURAL GALVANIZADO 2")
10.11 CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 61,561 61,561 61,561 61,561 61,561 61,561 61,561 61,561 61,561 61,561
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

10.12 DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 CONSTRUCCIÓN


590,584 590,584 590,584 590,584 590,584 590,584 590,584 590,584 590,584 590,584
10.13 DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 213,596 213,596 213,596 213,596 213,596 213,596 213,596 213,596 213,596 213,596
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
10.14 M2 241,908 241,908 241,908 241,908 241,908 241,908 241,908 241,908 241,908 241,908
ELECTROSTÁTICA
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
10.15 M2 882,415 882,415 882,415 882,415 882,415 882,415 882,415 882,415 882,415 882,415
PUERTAS Y ACCESORIOS)

10.16 REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 161,421 161,421 161,421 161,421 161,421 161,421 161,421 161,421 161,421 161,421
10.17 PUERTA CORTINA INCLUYE ESMALTE M2 430,038 430,038 430,038 430,038 430,038 430,038 430,038 430,038 430,038 430,038
10.18 SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 8,820 8,820 8,820 8,820 8,820 8,820 8,820 8,820 8,820 8,820
10.19 VENTANA EN ALUMINIO CORREDIZA M2 303,896 303,896 303,896 303,896 303,896 303,896 303,896 303,896 303,896 303,896
10.20 VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 139,759 139,759 139,759 139,759 139,759 139,759 139,759 139,759 139,759 139,759
10.21 REJILLA PISO 0.30 M M2 131,024 131,024 131,024 131,024 131,024 131,024 131,024 131,024 131,024 131,024
10.22 TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 99,335 99,335 99,335 99,335 99,335 99,335 99,335 99,335 99,335 99,335
CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,
10.23 KG 15,036 15,036 15,036 15,036 15,036 15,036 15,036 15,036 15,036 15,036
ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA
TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,


INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
10.24 KG 16,359 16,359 16,359 16,359 16,359 16,359 16,359 16,359 16,359 16,359
AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA


POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
10.25 COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y KG 15,962 15,962 15,962 15,962 15,962 15,962 15,962 15,962 15,962 15,962
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H:
10.26 M2 150,682 150,682 150,682 150,682 150,682 150,682 150,682 150,682 150,682 150,682
2.00 MTS
CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA
10.27 M2 169,706 169,706 169,706 169,706 169,706 169,706 169,706 169,706 169,706 169,706
CONTEMPORANEA) H: 4.80 MTS
11 INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO
11.1 ACOMETIDA EN PVC 1/2" 5M UN 250,761 250,761 250,761 250,761 250,761 250,761 250,761 250,761 250,761 250,761
11.2 ACOMETIDA EN PVC 3/4" 5M UN 300,293 300,293 300,293 300,293 300,293 300,293 300,293 300,293 300,293 300,293
11.3 BAJANTE AGUAS LLUVIAS PVC 3" ML 24,929 24,929 24,929 24,929 24,929 24,929 24,929 24,929 24,929 24,929
11.4 BAJANTE AGUAS LLUVIAS PVC 4" ML 38,909 38,909 38,909 38,909 38,909 38,909 38,909 38,909 38,909 38,909
11.5 BAJANTE AGUAS RESIDUALES PVC 3" ML 37,391 37,391 37,391 37,391 37,391 37,391 37,391 37,391 37,391 37,391
11.6 BAJANTE AGUAS RESIDUALES PVC 4" ML 47,721 47,721 47,721 47,721 47,721 47,721 47,721 47,721 47,721 47,721
11.7 BAJANTE AGUAS RESIDUALES PVC 6" ML 97,786 97,786 97,786 97,786 97,786 97,786 97,786 97,786 97,786 97,786
11.8 CONEXIÓN TANQUE ELEVADO PVC UN 252,240 252,240 252,240 252,240 252,240 252,240 252,240 252,240 252,240 252,240
11.9 INSTALACIÓN APARATO SANITARIO UN 51,418 51,418 51,418 51,418 51,418 51,418 51,418 51,418 51,418 51,418
11.10 INSTALACIÓN BOMBAS AGUA UN 716,753 716,753 716,753 716,753 716,753 716,753 716,753 716,753 716,753 716,753
11.11 INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 1,475,669 1,475,669 1,475,669 1,475,669 1,475,669 1,475,669 1,475,669 1,475,669 1,475,669 1,475,669
11.12 LLAVE MANGUERA UN 39,704 39,704 39,704 39,704 39,704 39,704 39,704 39,704 39,704 39,704
11.13 NIPLE PASAMURO 2" UN 76,302 76,302 76,302 76,302 76,302 76,302 76,302 76,302 76,302 76,302
11.14 NIPLE PASAMURO 4" UN 113,772 113,772 113,772 113,772 113,772 113,772 113,772 113,772 113,772 113,772
11.15 PUNTO AGUA CALIENTE CPVC UN 95,583 95,583 95,583 95,583 95,583 95,583 95,583 95,583 95,583 95,583
11.16 PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 71,020 71,020 71,020 71,020 71,020 71,020 71,020 71,020 71,020 71,020
11.17 PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 75,268 75,268 75,268 75,268 75,268 75,268 75,268 75,268 75,268 75,268
11.18 PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 95,094 95,094 95,094 95,094 95,094 95,094 95,094 95,094 95,094 95,094
11.19 SALIDA SANITARIA PVC-S/PARAL 2" UN 77,140 77,140 77,140 77,140 77,140 77,140 77,140 77,140 77,140 77,140
11.20 SALIDA SANITARIA PVC-S/PARAL 3" UN 95,445 95,445 95,445 95,445 95,445 95,445 95,445 95,445 95,445 95,445
11.21 SALIDA SANITARIA PVC-S/PARAL 4" UN 101,901 101,901 101,901 101,901 101,901 101,901 101,901 101,901 101,901 101,901
11.22 SALIDA SANITARIA PVC-S/SIFON 3" UN 83,728 83,728 83,728 83,728 83,728 83,728 83,728 83,728 83,728 83,728
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

11.23 RED SUMINISTRO CPVC 1/2" ML CONSTRUCCIÓN


14,045 14,045 14,045 14,045 14,045 14,045 14,045 14,045 14,045 14,045
11.24 RED SUMINISTRO CPVC 3/4" ML 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580
11.25 RED SUMINISTRO PVC 1 1/2" ML 25,742 25,742 25,742 25,742 25,742 25,742 25,742 25,742 25,742 25,742
11.26 RED SUMINISTRO PVC 1" ML 16,029 16,029 16,029 16,029 16,029 16,029 16,029 16,029 16,029 16,029
11.27 RED SUMINISTRO PVC 1/2" ML 9,615 9,615 9,615 9,615 9,615 9,615 9,615 9,615 9,615 9,615
11.28 RED SUMINISTRO PVC 2 1/2" ML 56,803 56,803 56,803 56,803 56,803 56,803 56,803 56,803 56,803 56,803
11.29 RED SUMINISTRO PVC 2" ML 36,534 36,534 36,534 36,534 36,534 36,534 36,534 36,534 36,534 36,534
11.30 RED SUMINISTRO PVC 3/4" ML 12,007 12,007 12,007 12,007 12,007 12,007 12,007 12,007 12,007 12,007
11.31 RED SANITARIA PVC-S 2" ML 28,789 28,789 28,789 28,789 28,789 28,789 28,789 28,789 28,789 28,789
11.32 RED SANITARIA PVC-S 3" ML 39,725 39,725 39,725 39,725 39,725 39,725 39,725 39,725 39,725 39,725
11.33 RED SANITARIA PVC-S 4" ML 53,948 53,948 53,948 53,948 53,948 53,948 53,948 53,948 53,948 53,948
11.34 RED SANITARIA PVC-S 6" ML 99,311 99,311 99,311 99,311 99,311 99,311 99,311 99,311 99,311 99,311
11.35 REGISTRO 1" UN 119,296 119,296 119,296 119,296 119,296 119,296 119,296 119,296 119,296 119,296
11.36 REGISTRO 1/2" UN 66,636 66,636 66,636 66,636 66,636 66,636 66,636 66,636 66,636 66,636
11.37 REGISTRO 3/4" UN 84,520 84,520 84,520 84,520 84,520 84,520 84,520 84,520 84,520 84,520
11.38 REGISTRO 1 1/2" UN 203,199 203,199 203,199 203,199 203,199 203,199 203,199 203,199 203,199 203,199
11.39 REGISTRO 2 1/2" UN 417,488 417,488 417,488 417,488 417,488 417,488 417,488 417,488 417,488 417,488
11.40 REGISTRO 2" UN 309,075 309,075 309,075 309,075 309,075 309,075 309,075 309,075 309,075 309,075
11.41 REVENTILACIÓN 2" ML 20,196 20,196 20,196 20,196 20,196 20,196 20,196 20,196 20,196 20,196
11.42 REVENTILACIÓN 3" ML 25,406 25,406 25,406 25,406 25,406 25,406 25,406 25,406 25,406 25,406
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
11.43 UN 291,474 291,474 291,474 291,474 291,474 291,474 291,474 291,474 291,474 291,474
INSTALACIÓN)
TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
11.44 UN 379,054 379,054 379,054 379,054 379,054 379,054 379,054 379,054 379,054 379,054
ISNTALACIÓN)
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
11.45 UN 693,489 693,489 693,489 693,489 693,489 693,489 693,489 693,489 693,489 693,489
INSTALACIÓN)
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
11.46 ML 44,475 44,475 44,475 44,475 44,475 44,475 44,475 44,475 44,475 44,475
SOPORTES)
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
11.47 ML 52,453 52,453 52,453 52,453 52,453 52,453 52,453 52,453 52,453 52,453
ACCESORIOS Y SOPORTES)
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
11.48 ML 67,663 67,663 67,663 67,663 67,663 67,663 67,663 67,663 67,663 67,663
SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS
11.49 ML 76,605 76,605 76,605 76,605 76,605 76,605 76,605 76,605 76,605 76,605
Y SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
11.50 ML 98,720 98,720 98,720 98,720 98,720 98,720 98,720 98,720 98,720 98,720
ACCESORIOS Y SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
11.51 ML 114,907 114,907 114,907 114,907 114,907 114,907 114,907 114,907 114,907 114,907
SOPORTES)
TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
11.52 ML 169,902 169,902 169,902 169,902 169,902 169,902 169,902 169,902 169,902 169,902
SOPORTES)
11.53 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 69,212 69,212 69,212 69,212 69,212 69,212 69,212 69,212 69,212 69,212
11.54 PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 69,486 69,486 69,486 69,486 69,486 69,486 69,486 69,486 69,486 69,486
11.55 ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 44,230 44,230 44,230 44,230 44,230 44,230 44,230 44,230 44,230 44,230
11.56 ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 54,333 54,333 54,333 54,333 54,333 54,333 54,333 54,333 54,333 54,333
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA
11.57 ML 4,557 4,557 4,557 4,557 4,557 4,557 4,557 4,557 4,557 4,557
2"
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A
11.58 ML 7,172 7,172 7,172 7,172 7,172 7,172 7,172 7,172 7,172 7,172
2"
11.59 GABINETE TIPO III UN 1,112,569 1,112,569 1,112,569 1,112,569 1,112,569 1,112,569 1,112,569 1,112,569 1,112,569 1,112,569
11.60 GABINETE TIPO I UN 851,569 851,569 851,569 851,569 851,569 851,569 851,569 851,569 851,569 851,569
11.61 SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 2,851,530 2,851,530 2,851,530 2,851,530 2,851,530 2,851,530 2,851,530 2,851,530 2,851,530 2,851,530
11.62 SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 2,379,371 2,379,371 2,379,371 2,379,371 2,379,371 2,379,371 2,379,371 2,379,371 2,379,371 2,379,371
11.63 VÁLVULA MARIPOSA 3" UN 697,762 697,762 697,762 697,762 697,762 697,762 697,762 697,762 697,762 697,762
11.64 VÁLVULA MARIPOSA 4" UN 899,827 899,827 899,827 899,827 899,827 899,827 899,827 899,827 899,827 899,827
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

11.65 VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN CONSTRUCCIÓN


343,235 343,235 343,235 343,235 343,235 343,235 343,235 343,235 343,235 343,235

12 INSTALACIONES ELÉCTRICAS
12.1 ACOMETIDA AÉREA 10 M. PVC UN 401,913 401,913 401,913 401,913 401,913 401,913 401,913 401,913 401,913 401,913
12.2 SALIDA LÁMPARA TOMA PVC COMPLETA UN 63,978 63,978 63,978 63,978 63,978 63,978 63,978 63,978 63,978 63,978
12.3 SALIDA LÁMPARA TOMA EMT COMPLETA UN 75,536 75,536 75,536 75,536 75,536 75,536 75,536 75,536 75,536 75,536
12.4 SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 84,054 84,054 84,054 84,054 84,054 84,054 84,054 84,054 84,054 84,054
12.5 SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 98,748 98,748 98,748 98,748 98,748 98,748 98,748 98,748 98,748 98,748
12.6 SALIDA TELÉFONO PVC COMPLETA UN 60,268 60,268 60,268 60,268 60,268 60,268 60,268 60,268 60,268 60,268
12.7 SALIDA TIMBRE PVC COMPLETA UN 68,585 68,585 68,585 68,585 68,585 68,585 68,585 68,585 68,585 68,585
12.8 STRIP TELEFÓNICO 10 PARES UN 159,075 159,075 159,075 159,075 159,075 159,075 159,075 159,075 159,075 159,075
12.9 SALIDA TOMA DOBLE PVC COMPLETA UN 61,801 61,801 61,801 61,801 61,801 61,801 61,801 61,801 61,801 61,801
12.10 SALIDA TRIFÁSICA PVC COMPLETA UN 141,567 141,567 141,567 141,567 141,567 141,567 141,567 141,567 141,567 141,567
12.11 SALIDA T.V PVC COMPLETA. UN 84,922 84,922 84,922 84,922 84,922 84,922 84,922 84,922 84,922 84,922
12.12 SALIDA BIFÁSICA C.N. UN 50,399 50,399 50,399 50,399 50,399 50,399 50,399 50,399 50,399 50,399
12.13 TABLERO PARCIAL 4 CIRCUITOS UN 106,395 106,395 106,395 106,395 106,395 106,395 106,395 106,395 106,395 106,395
12.14 TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 454,800 454,800 454,800 454,800 454,800 454,800 454,800 454,800 454,800 454,800
12.15 TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 604,700 604,700 604,700 604,700 604,700 604,700 604,700 604,700 604,700 604,700
12.16 TUBERÍA PVC CONDUIT 1/2" ML 3,945 3,945 3,945 3,945 3,945 3,945 3,945 3,945 3,945 3,945
12.17 TUBERÍA PVC CONDUIT 3/4" ML 5,205 5,205 5,205 5,205 5,205 5,205 5,205 5,205 5,205 5,205
12.18 TUBERÍA PVC CONDUIT 1" ML 8,078 8,078 8,078 8,078 8,078 8,078 8,078 8,078 8,078 8,078
12.19 TUBERÍA PVC CONDUIT 1 1/2" ML 14,425 14,425 14,425 14,425 14,425 14,425 14,425 14,425 14,425 14,425
12.20 LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 301,468 301,468 301,468 301,468 301,468 301,468 301,468 301,468 301,468 301,468
12.21 LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 85,550 85,550 85,550 85,550 85,550 85,550 85,550 85,550 85,550 85,550
12.22 LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 115,189 115,189 115,189 115,189 115,189 115,189 115,189 115,189 115,189 115,189
12.23 LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 48,052 48,052 48,052 48,052 48,052 48,052 48,052 48,052 48,052 48,052
12.24 POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,550,606 1,550,606 1,550,606 1,550,606 1,550,606 1,550,606 1,550,606 1,550,606 1,550,606 1,550,606
12.25 POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1,148,731 1,148,731 1,148,731 1,148,731 1,148,731 1,148,731 1,148,731 1,148,731 1,148,731 1,148,731
12.26 POSTE METÁLICO 6M UN 1,418,316 1,418,316 1,418,316 1,418,316 1,418,316 1,418,316 1,418,316 1,418,316 1,418,316 1,418,316
12.27 FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 658,748 658,748 658,748 658,748 658,748 658,748 658,748 658,748 658,748 658,748
12.28 APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 121,618 121,618 121,618 121,618 121,618 121,618 121,618 121,618 121,618 121,618
12.29 LUMINARIA 70W SODIO UN 552,288 552,288 552,288 552,288 552,288 552,288 552,288 552,288 552,288 552,288
12.30 LUMINARIA 150W SODIO UN 690,374 690,374 690,374 690,374 690,374 690,374 690,374 690,374 690,374 690,374
12.31 REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,819,750 1,819,750 1,819,750 1,819,750 1,819,750 1,819,750 1,819,750 1,819,750 1,819,750 1,819,750
12.32 REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1,340,714 1,340,714 1,340,714 1,340,714 1,340,714 1,340,714 1,340,714 1,340,714 1,340,714 1,340,714

13 PISOS BASES
13.1 ALISTADO ENDURECIDO 1:3, E=0.04 M2 44,187 45,645 43,905 44,570 44,826 44,059 44,442 44,084 44,212 45,312
13.2 ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 43,382 44,840 43,101 43,766 44,022 43,254 43,638 43,280 43,408 44,508
13.3 ALISTADO PARA LISTÓN M2 16,715 17,007 16,659 16,792 16,843 16,690 16,766 16,695 16,720 16,940
13.4 ALISTADO PISOS 1:3, E=0.04 M2 30,361 33,277 29,798 31,128 31,640 30,105 30,872 30,156 30,412 32,612
13.5 ALISTADO TERRAZAS 1:3, E= 0.08 M2 92,938 95,853 92,375 93,705 94,216 92,682 93,449 92,733 92,989 95,188
13.6 CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 30,738 32,024 30,490 31,076 31,302 30,625 30,963 30,648 30,760 31,730
13.7 CONCRETO BASE GRADAS 2500 PSI M2 65,384 71,723 64,160 67,052 68,164 64,828 66,496 64,939 65,495 70,277
13.8 CONCRETO ESTRIADO RAMPAS 2500 PSI M2 90,171 100,314 88,214 92,840 94,620 89,282 91,951 89,459 90,349 98,001
13.9 MANTO FIBERGLASS 600X1 M2 33,890 33,890 33,890 33,890 33,890 33,890 33,890 33,890 33,890 33,890
13.10 PEGANTE MORTERO-CONCRETO M2 26,088 26,088 26,088 26,088 26,088 26,088 26,088 26,088 26,088 26,088
13.11 PERMA PLY 2 CAPAS M2 30,768 30,768 30,768 30,768 30,768 30,768 30,768 30,768 30,768 30,768
13.12 PLACA BASE CONCRETO 0.08 2500 PSI M2 53,091 58,796 51,990 54,592 55,593 52,590 54,091 52,690 53,191 57,495
13.13 PLACA BASE CONCRETO 0.10 2500 PSI M2 62,120 69,093 60,775 63,955 65,179 61,509 63,344 61,631 62,243 67,503
13.14 PLACA BASE CONCRETO 0.15 2500 PSI M2 89,762 100,539 87,683 92,598 94,489 88,817 91,653 89,006 89,951 98,081
13.15 TRITURADO FINO 1/2 M3 117,021 164,440 107,871 129,500 137,819 112,862 125,340 113,693 117,853 153,625
13.16 TRITURADO GRUESO 3/4 M3 111,566 160,469 106,422 131,243 133,350 113,895 127,602 113,350 110,224 150,050

14 PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
14.1 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 64,046 64,629 63,933 64,199 64,302 63,995 64,148 64,005 64,056 64,496
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

14.2 BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML


CONSTRUCCIÓN
38,616 38,908 38,560 38,693 38,744 38,591 38,667 38,596 38,621 38,841
14.3 ADOQUÍN CONCRETO 6CM M2 72,954 74,412 72,673 73,338 73,593 72,826 73,210 72,852 72,980 74,079
14.4 ADOQUÍN CONCRETO 8CM M2 76,604 78,062 76,323 76,988 77,243 76,476 76,860 76,502 76,630 77,729
14.5 ADOQUÍN GRES PEATONAL M2 81,372 82,830 81,091 81,756 82,012 81,244 81,628 81,270 81,398 82,498
BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
14.6 M2 83,855 84,438 83,743 84,009 84,111 83,804 83,957 83,814 83,865 84,305
BLANCO. INCLUYE ALISTADO
14.7 GRAVILLA PARA GRADAS ML 43,408 44,120 43,271 43,595 43,720 43,345 43,533 43,358 43,420 43,957
14.8 ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 193,959 196,583 193,452 194,649 195,109 193,728 194,419 193,774 194,004 195,984
14.9 ACABADO EN GRAVILLA LAVADA M2 60,864 62,579 60,533 61,316 61,616 60,714 61,165 60,744 60,894 62,188
14.10 GUARDAESCOBA EN GRANITO ML 50,347 50,347 50,347 50,347 50,347 50,347 50,347 50,347 50,347 50,347
14.11 GUARDAESCOBA EN GRAVILLA ML 11,765 12,476 11,628 11,952 12,077 11,702 11,890 11,715 11,777 12,314
14.12 GUARDAESCOBA PVC CARAMELO ML 10,387 10,387 10,387 10,387 10,387 10,387 10,387 10,387 10,387 10,387
14.13 GUARDAESCOBA PVC CEDRO ML 13,903 13,903 13,903 13,903 13,903 13,903 13,903 13,903 13,903 13,903
14.14 GUARDAESCOBA PINO CARIBE ML 11,928 11,928 11,928 11,928 11,928 11,928 11,928 11,928 11,928 11,928
14.15 GUARDAESCOBA CEDRO BLANCO ML 19,701 19,701 19,701 19,701 19,701 19,701 19,701 19,701 19,701 19,701
14.16 GUARDAESCOBA EN MADERA SAPAN ML 37,991 37,991 37,991 37,991 37,991 37,991 37,991 37,991 37,991 37,991
14.17 GUARDAESCOBA GRES Y CERÁMICA ML 10,732 10,732 10,732 10,732 10,732 10,732 10,732 10,732 10,732 10,732
14.18 LISTÓN M.H. AMARILLO M2 83,863 83,863 83,863 83,863 83,863 83,863 83,863 83,863 83,863 83,863
14.19 PASO ESCALERA GRANITO ML 135,353 137,394 134,959 135,890 136,248 135,174 135,711 135,210 135,389 136,929
14.20 PIRLANES ALUMINIO ML 8,851 8,851 8,851 8,851 8,851 8,851 8,851 8,851 8,851 8,851
14.21 PIRLANES LADRILLO ML 37,146 38,005 36,980 37,372 37,523 37,071 37,297 37,086 37,161 37,809
14.22 PISO VINILO TRÁFICO RESIDENCIAL M2 51,155 51,155 51,155 51,155 51,155 51,155 51,155 51,155 51,155 51,155
14.23 PISO VINILO TRÁFICO PESADO M2 59,255 59,255 59,255 59,255 59,255 59,255 59,255 59,255 59,255 59,255
14.24 PULIDA LACADA PISO MADERA M2 55,791 55,791 55,791 55,791 55,791 55,791 55,791 55,791 55,791 55,791
14.25 TABLETA DE GRES 25X25 M2 55,657 56,240 55,545 55,811 55,913 55,606 55,759 55,616 55,667 56,107
14.26 TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 62,295 62,879 62,183 62,449 62,551 62,244 62,398 62,255 62,306 62,746
14.27 GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 12,622 12,622 12,622 12,622 12,622 12,622 12,622 12,622 12,622 12,622
14.28 ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 56,513 57,802 56,264 56,852 57,079 56,400 56,739 56,423 56,536 57,508
14.29 JABONERA PORCELANA ACUARIO UN 23,042 23,042 23,042 23,042 23,042 23,042 23,042 23,042 23,042 23,042
JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
14.30 UN 137,140 137,140 137,140 137,140 137,140 137,140 137,140 137,140 137,140 137,140
JABONERA,CEPILLERA Y PERCHA SIMPLE)
14.31 REJILLA PLÁSTICA SOSCO 3X2 UN 11,492 11,492 11,492 11,492 11,492 11,492 11,492 11,492 11,492 11,492
14.32 REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 25,257 25,257 25,257 25,257 25,257 25,257 25,257 25,257 25,257 25,257
14.33 REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 16,428 16,428 16,428 16,428 16,428 16,428 16,428 16,428 16,428 16,428
14.34 REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 15,978 15,978 15,978 15,978 15,978 15,978 15,978 15,978 15,978 15,978
14.35 REMATES BOCEL ALUMINIO ML 9,932 9,932 9,932 9,932 9,932 9,932 9,932 9,932 9,932 9,932
14.36 REMATES BOCEL PORCELANA ML 10,097 10,097 10,097 10,097 10,097 10,097 10,097 10,097 10,097 10,097
14.37 TAPA REGISTRO 20X20 UN 21,493 21,493 21,493 21,493 21,493 21,493 21,493 21,493 21,493 21,493
14.38 TAPA REGISTRO 6X6 UN 19,642 19,642 19,642 19,642 19,642 19,642 19,642 19,642 19,642 19,642
14.39 DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 20,468 20,468 20,468 20,468 20,468 20,468 20,468 20,468 20,468 20,468
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
14.40 M2 23,661 23,661 23,661 23,661 23,661 23,661 23,661 23,661 23,661 23,661
FUNDIDO EN SITIO
14.41 CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 72,625 73,208 72,512 72,778 72,881 72,574 72,727 72,584 72,635 73,075
14.42 MEDIA CAÑA EN GRANITO ML 85,539 85,539 85,539 85,539 85,539 85,539 85,539 85,539 85,539 85,539
14.43 PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 40,012 40,012 40,012 40,012 40,012 40,012 40,012 40,012 40,012 40,012
14.44 PINTURA ACRÍLICA PARA PISOS M2 15,004 15,004 15,004 15,004 15,004 15,004 15,004 15,004 15,004 15,004
14.45 PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 111,700 111,700 111,700 111,700 111,700 111,700 111,700 111,700 111,700 111,700
14.46 GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 135,774 135,774 135,774 135,774 135,774 135,774 135,774 135,774 135,774 135,774

15 CIELO RASO
15.1 APLIQUE YESO ML 80,457 80,457 80,457 80,457 80,457 80,457 80,457 80,457 80,457 80,457
15.2 ARMADURA MADERA Y MALLA M2 41,540 41,540 41,540 41,540 41,540 41,540 41,540 41,540 41,540 41,540
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

15.3 CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 CONSTRUCCIÓN


62,645 62,645 62,645 62,645 62,645 62,645 62,645 62,645 62,645 62,645
15.4 CIELO RASO DURACUSTIC M2 76,422 76,422 76,422 76,422 76,422 76,422 76,422 76,422 76,422 76,422
15.5 CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 57,212 57,212 57,212 57,212 57,212 57,212 57,212 57,212 57,212 57,212
15.6 CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 105,284 105,284 105,284 105,284 105,284 105,284 105,284 105,284 105,284 105,284
15.7 CORNISAS YESO ML 53,884 53,884 53,884 53,884 53,884 53,884 53,884 53,884 53,884 53,884
15.8 LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 115,940 115,940 115,940 115,940 115,940 115,940 115,940 115,940 115,940 115,940
15.9 MALLA CON VENA M2 15,521 15,521 15,521 15,521 15,521 15,521 15,521 15,521 15,521 15,521

16 EXCAVACIONES Y RELLENOS
16.1 EXPLANACIÓN Y EXTENDIDA M3 6,019 6,019 6,019 6,019 6,019 6,019 6,019 6,019 6,019 6,019
EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
16.2 M3 19,041 19,041 19,041 19,041 19,041 19,041 19,041 19,041 19,041 19,041
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
16.3 EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 30,126 30,126 30,126 30,126 30,126 30,126 30,126 30,126 30,126 30,126
EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
16.4 M3 49,774 49,774 49,774 49,774 49,774 49,774 49,774 49,774 49,774 49,774
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE


16.5 M3 57,078 57,078 57,078 57,078 57,078 57,078 57,078 57,078 57,078 57,078
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

16.6 EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 97,410 97,410 97,410 97,410 97,410 97,410 97,410 97,410 97,410 97,410

16.7 RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487
16.8 RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 82,025 136,352 91,079 127,297 107,377 107,377 125,486 101,944 72,970 127,297
16.9 RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 115,796 162,000 106,879 127,955 136,061 111,742 123,901 112,553 116,606 151,463
RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
16.10 M3 200,605 284,457 221,075 199,344 282,646 239,184 275,402 215,642 248,239 284,457
MECÁNICAMENTE
16.11 AFRIMADO (NORMA INVIAS 311) M3 69,373 123,700 78,427 114,645 94,725 94,725 112,834 89,293 69,373 114,645
16.12 SUBBASE GRANULAR (NORMA INVIAS 320) M3 170,724 249,913 186,532 164,801 248,102 204,641 240,859 181,099 213,695 249,913
16.13 BASE GRANULAR (NORMA INVIAS 330) M3 196,113 279,964 216,583 194,852 278,153 234,692 270,910 211,150 243,746 279,964

17 APARATOS SANITARIOS

17.1 SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 334,483 334,483 334,483 334,483 334,483 334,483 334,483 334,483 334,483 334,483
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
17.2 UN 978,974 978,974 978,974 978,974 978,974 978,974 978,974 978,974 978,974 978,974
GRIFERÍA)

17.3 SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 531,964 531,964 531,964 531,964 531,964 531,964 531,964 531,964 531,964 531,964

17.4 SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 157,360 157,360 157,360 157,360 157,360 157,360 157,360 157,360 157,360 157,360
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE
17.5 UN 218,209 218,209 218,209 218,209 218,209 218,209 218,209 218,209 218,209 218,209
GRIFERÍA)
SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
17.6 UN 202,924 202,924 202,924 202,924 202,924 202,924 202,924 202,924 202,924 202,924
GRIFERÍA)

17.7 SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 442,109 442,109 442,109 442,109 442,109 442,109 442,109 442,109 442,109 442,109
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
17.8 UN 1,125,210 1,125,210 1,125,210 1,125,210 1,125,210 1,125,210 1,125,210 1,125,210 1,125,210 1,125,210
GRIFERÍA)

17.9 SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 322,206 322,206 322,206 322,206 322,206 322,206 322,206 322,206 322,206 322,206
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A
17.10 UN 229,796 229,796 229,796 229,796 229,796 229,796 229,796 229,796 229,796 229,796
BAÑERA
17.11 SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 93,576 93,576 93,576 93,576 93,576 93,576 93,576 93,576 93,576 93,576
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
17.12 UN 276,914 276,914 276,914 276,914 276,914 276,914 276,914 276,914 276,914 276,914
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO


CONSTRUCCIÓN
17.13 UN 406,108 406,108 406,108 406,108 406,108 406,108 406,108 406,108 406,108 406,108
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

18 PINTURAS
18.1 IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 9,505 9,505 9,505 9,505 9,505 9,505 9,505 9,505 9,505 9,505
18.2 ANTICORROSIVO SOBRE LÁMINA LINEAL ML 3,495 3,495 3,495 3,495 3,495 3,495 3,495 3,495 3,495 3,495
18.3 ANTICORROSIVO SOBRE LÁMINA LLENA M2 12,812 12,812 12,812 12,812 12,812 12,812 12,812 12,812 12,812 12,812
18.4 BARNIZ SOBRE MUEBLES M2 47,798 47,798 47,798 47,798 47,798 47,798 47,798 47,798 47,798 47,798
18.5 CARBURO SOBRE PAÑETES M2 6,706 6,706 6,706 6,706 6,706 6,706 6,706 6,706 6,706 6,706
18.6 COLORPLAST FACHADA SOBRE FACHADA M2 72,352 72,352 72,352 72,352 72,352 72,352 72,352 72,352 72,352 72,352
18.7 DEMARCACIÓN CON MARMOLINA ML 4,012 4,012 4,012 4,012 4,012 4,012 4,012 4,012 4,012 4,012
18.8 ESMALTE SOBRE LÁMINA LINEAL ML 3,147 3,147 3,147 3,147 3,147 3,147 3,147 3,147 3,147 3,147
18.9 ESMALTE SOBRE LÁMINA LLENA M2 15,912 15,912 15,912 15,912 15,912 15,912 15,912 15,912 15,912 15,912
18.10 ESMALTE SOBRE MADERA LINEAL ML 4,588 4,588 4,588 4,588 4,588 4,588 4,588 4,588 4,588 4,588
18.11 ESMALTE SOBRE MADERA LLENA M2 16,768 16,768 16,768 16,768 16,768 16,768 16,768 16,768 16,768 16,768
18.12 ESMALTE SOBRE MARCOS LÁMINA M2 6,429 6,429 6,429 6,429 6,429 6,429 6,429 6,429 6,429 6,429
18.13 ESMALTE SOBRE MARCOS MADERA M2 7,345 7,345 7,345 7,345 7,345 7,345 7,345 7,345 7,345 7,345
18.14 ESTUCO M2 8,107 8,107 8,107 8,107 8,107 8,107 8,107 8,107 8,107 8,107
18.15 ESTUCO (LINEAL) ML 5,094 5,094 5,094 5,094 5,094 5,094 5,094 5,094 5,094 5,094
18.16 ESTUCO Y VINILO 3 MANOS M2 17,750 17,750 17,750 17,750 17,750 17,750 17,750 17,750 17,750 17,750
18.17 ESTUCO Y VINILO 3 MANOS (LINEAL) ML 11,060 11,060 11,060 11,060 11,060 11,060 11,060 11,060 11,060 11,060
18.18 LACA PISOS MADERA M2 26,266 26,266 26,266 26,266 26,266 26,266 26,266 26,266 26,266 26,266
18.19 LÍNEAS TRÁFICO 0.10 ML 3,082 3,082 3,082 3,082 3,082 3,082 3,082 3,082 3,082 3,082
18.20 MARMOLINA SOBRE PAÑETE M2 13,665 13,665 13,665 13,665 13,665 13,665 13,665 13,665 13,665 13,665
18.21 TINTILLA SOBRE MADERA LINEAL ML 3,696 3,696 3,696 3,696 3,696 3,696 3,696 3,696 3,696 3,696
18.22 TINTILLA SOBRE MADERA LLENA M2 14,353 14,353 14,353 14,353 14,353 14,353 14,353 14,353 14,353 14,353
18.23 VINILO SOBRE PAÑETE 2 MANOS M2 8,093 8,093 8,093 8,093 8,093 8,093 8,093 8,093 8,093 8,093
18.24 VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML 5,117 5,117 5,117 5,117 5,117 5,117 5,117 5,117 5,117 5,117
18.25 WASH-PRIMER SOBRE ALUMNIO M2 24,550 24,550 24,550 24,550 24,550 24,550 24,550 24,550 24,550 24,550
18.26 PINTURA EPÓXICA M2 14,559 14,559 14,559 14,559 14,559 14,559 14,559 14,559 14,559 14,559
18.27 PINTURA EPÓXICA (LINEAL) ML 9,034 9,034 9,034 9,034 9,034 9,034 9,034 9,034 9,034 9,034

19 DOTACIONES DEPORTIVAS
19.1 CANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 6,644,004 6,644,004 6,644,004 6,644,004 6,644,004 6,644,004 6,644,004 6,644,004 6,644,004 6,644,004
CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
19.2 UN 11,739,018 11,739,018 11,739,018 11,739,018 11,739,018 11,739,018 11,739,018 11,739,018 11,739,018 11,739,018
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)
19.3 CANCHA PARA MICROFÚTBOL (PAR) UN 3,072,542 3,072,542 3,072,542 3,072,542 3,072,542 3,072,542 3,072,542 3,072,542 3,072,542 3,072,542
19.4 CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 10,040,260 10,040,260 10,040,260 10,040,260 10,040,260 10,040,260 10,040,260 10,040,260 10,040,260 10,040,260
19.5 CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 9,400,211 9,400,211 9,400,211 9,400,211 9,400,211 9,400,211 9,400,211 9,400,211 9,400,211 9,400,211
19.6 DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 3,082 3,082 3,082 3,082 3,082 3,082 3,082 3,082 3,082 3,082
19.7 TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 945,203 945,203 945,203 945,203 945,203 945,203 945,203 945,203 945,203 945,203
19.8 MALLA NYLON PETROLIZADA VOLEIBOL UN 94,129 94,129 94,129 94,129 94,129 94,129 94,129 94,129 94,129 94,129
19.9 SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,707,003 1,707,655 1,706,877 1,707,175 1,707,289 1,706,946 1,707,117 1,706,957 1,707,015 1,707,506
19.10 CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 940,231 955,497 937,285 944,249 946,927 938,892 942,910 939,160 940,499 952,016

20 INSTALACIONES RED GASES


20.1 TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 38,642 38,642 38,642 38,642 38,642 38,642 38,642 38,642 38,642 38,642
20.2 TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 55,620 55,620 55,620 55,620 55,620 55,620 55,620 55,620 55,620 55,620
20.3 TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 65,811 65,811 65,811 65,811 65,811 65,811 65,811 65,811 65,811 65,811
20.4 TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 19,447 19,447 19,447 19,447 19,447 19,447 19,447 19,447 19,447 19,447

20.5 TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 23,570 23,570 23,570 23,570 23,570 23,570 23,570 23,570 23,570 23,570
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

20.6 TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML


CONSTRUCCIÓN
32,105 32,105 32,105 32,105 32,105 32,105 32,105 32,105 32,105 32,105
20.7 TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 28,559 28,559 28,559 28,559 28,559 28,559 28,559 28,559 28,559 28,559
20.8 TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 30,150 30,150 30,150 30,150 30,150 30,150 30,150 30,150 30,150 30,150
20.9 TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 37,709 37,709 37,709 37,709 37,709 37,709 37,709 37,709 37,709 37,709
20.10 VÁLVULA DE BOLA GAS 1/2" UN 19,572 19,572 19,572 19,572 19,572 19,572 19,572 19,572 19,572 19,572
20.11 VÁLVULA DE BOLA GAS 3/4" UN 25,596 25,596 25,596 25,596 25,596 25,596 25,596 25,596 25,596 25,596
20.12 VÁLVULA DE BOLA GAS 1" UN 39,239 39,239 39,239 39,239 39,239 39,239 39,239 39,239 39,239 39,239
20.13 VÁLVULA POLIETILENO GAS 1/2" UN 298,709 298,709 298,709 298,709 298,709 298,709 298,709 298,709 298,709 298,709
20.14 VÁLVULA POLIETILENO GAS 3/4" UN 343,727 343,727 343,727 343,727 343,727 343,727 343,727 343,727 343,727 343,727
20.15 VÁLVULA POLIETILENO GAS 1" UN 358,619 358,619 358,619 358,619 358,619 358,619 358,619 358,619 358,619 358,619
20.16 ACOMETIDA GAS 1/2" ML 333,901 333,901 333,901 333,901 333,901 333,901 333,901 333,901 333,901 333,901

21.1 INSTALACIONES RED VOZ Y DATOS


21.1 SENSOR DE HUMO FOTOELÉCTRICO UN 244,124 244,124 244,124 244,124 244,124 244,124 244,124 244,124 244,124 244,124
21.2 CABLE DETECTOR LINEAL DE CALOR ML 37,231 37,231 37,231 37,231 37,231 37,231 37,231 37,231 37,231 37,231
21.3 SIRENA DE 110 V UN 114,570 114,570 114,570 114,570 114,570 114,570 114,570 114,570 114,570 114,570
21.4 CÁMARA CCTV UN 295,687 295,687 295,687 295,687 295,687 295,687 295,687 295,687 295,687 295,687
21.5 PARLANTE-CIELO FALSO UN 58,233 58,233 58,233 58,233 58,233 58,233 58,233 58,233 58,233 58,233
21.6 AMPLIFICADOR 100W UN 633,745 633,745 633,745 633,745 633,745 633,745 633,745 633,745 633,745 633,745
21.7 AMPLIFICADOR 300W UN 1,560,901 1,560,901 1,560,901 1,560,901 1,560,901 1,560,901 1,560,901 1,560,901 1,560,901 1,560,901
21.8 ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 52,130 52,130 52,130 52,130 52,130 52,130 52,130 52,130 52,130 52,130
21.9 MICRÓFONO PG 48LC (INCLUYE BASE) UN 243,566 243,566 243,566 243,566 243,566 243,566 243,566 243,566 243,566 243,566
21.10 TOMA PARA MICRÓFONO UN 49,645 49,645 49,645 49,645 49,645 49,645 49,645 49,645 49,645 49,645
21.11 CABLE BLINDADO STEREO PARA MICRÓFONO ML 4,182 4,182 4,182 4,182 4,182 4,182 4,182 4,182 4,182 4,182
21.12 SPLITERS UN 6,951 6,951 6,951 6,951 6,951 6,951 6,951 6,951 6,951 6,951
21.13 TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 21,376 21,376 21,376 21,376 21,376 21,376 21,376 21,376 21,376 21,376
21.14 TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 27,856 27,856 27,856 27,856 27,856 27,856 27,856 27,856 27,856 27,856
21.15 TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 36,142 36,142 36,142 36,142 36,142 36,142 36,142 36,142 36,142 36,142
21.16 BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 135,511 135,511 135,511 135,511 135,511 135,511 135,511 135,511 135,511 135,511
21.17 TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 35,383 35,383 35,383 35,383 35,383 35,383 35,383 35,383 35,383 35,383
21.18 BANDEJA PORTACABLES PARA RACK UN 115,165 115,165 115,165 115,165 115,165 115,165 115,165 115,165 115,165 115,165
21.19 RACK 2' X 24" UN 207,696 207,696 207,696 207,696 207,696 207,696 207,696 207,696 207,696 207,696
21.20 RACK 3' X 24" UN 322,374 322,374 322,374 322,374 322,374 322,374 322,374 322,374 322,374 322,374
21.21 RACK 5' X 24" UN 402,270 402,270 402,270 402,270 402,270 402,270 402,270 402,270 402,270 402,270
21.22 RACK 7' X 24" UN 438,560 438,560 438,560 438,560 438,560 438,560 438,560 438,560 438,560 438,560
21.23 PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 647,911 647,911 647,911 647,911 647,911 647,911 647,911 647,911 647,911 647,911
21.24 PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 383,312 383,312 383,312 383,312 383,312 383,312 383,312 383,312 383,312 383,312
21.25 SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 115,079 115,079 115,079 115,079 115,079 115,079 115,079 115,079 115,079 115,079
21.26 PATCH CORD 2M CATEGORÍA 6A UN 15,218 15,218 15,218 15,218 15,218 15,218 15,218 15,218 15,218 15,218
21.27 PATCH CORD 5M CATEGORÍA 6A UN 31,041 31,041 31,041 31,041 31,041 31,041 31,041 31,041 31,041 31,041
21.28 CABLE UTP CATEGORÍA 6A ML 5,605 5,605 5,605 5,605 5,605 5,605 5,605 5,605 5,605 5,605
21.29 CANALETA METÁLICA 4X6 CMS ML 39,742 39,742 39,742 39,742 39,742 39,742 39,742 39,742 39,742 39,742
21.30 CANALETA METÁLICA 4X10 CMS ML 41,471 41,471 41,471 41,471 41,471 41,471 41,471 41,471 41,471 41,471
21.31 CANALETA METÁLICA 6X10 CMS ML 42,335 42,335 42,335 42,335 42,335 42,335 42,335 42,335 42,335 42,335
21.32 CANALETA PLÁSTICA 13X7 MM ML 27,650 27,650 27,650 27,650 27,650 27,650 27,650 27,650 27,650 27,650
21.33 CANALETA PLÁSTICA 20X12 MM ML 30,497 30,497 30,497 30,497 30,497 30,497 30,497 30,497 30,497 30,497
21.34 CANALETA PLÁSTICA 32X12 MM ML 31,691 31,691 31,691 31,691 31,691 31,691 31,691 31,691 31,691 31,691
21.35 CANALETA PLÁSTICA 40X60 MM ML 52,704 52,704 52,704 52,704 52,704 52,704 52,704 52,704 52,704 52,704
21.36 SWITCH 10/100/1000 24 PUERTOS UN 678,020 678,020 678,020 678,020 678,020 678,020 678,020 678,020 678,020 678,020
21.37 SWITCH 10/100/1000 16 PUERTOS UN 349,926 349,926 349,926 349,926 349,926 349,926 349,926 349,926 349,926 349,926
21.38 SWITCH 10/100/1000 8 PUERTOS UN 100,219 100,219 100,219 100,219 100,219 100,219 100,219 100,219 100,219 100,219
21.39 CABLE TELEFÓNICO 2 PARES ML 2,066 2,066 2,066 2,066 2,066 2,066 2,066 2,066 2,066 2,066
21.40 CABLE TELEFÓNICO 10 PARES ML 9,513 9,513 9,513 9,513 9,513 9,513 9,513 9,513 9,513 9,513
21.41 CABLE TELEFÓNICO 20 PARES ML 14,078 14,078 14,078 14,078 14,078 14,078 14,078 14,078 14,078 14,078
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

21.42 CABLE TELEFÓNICO 40 PARES ML CONSTRUCCIÓN


23,409 23,409 23,409 23,409 23,409 23,409 23,409 23,409 23,409 23,409
21.43 CABLE TELEVISIÓN RG6 ML 4,378 4,378 4,378 4,378 4,378 4,378 4,378 4,378 4,378 4,378
21.44 ACOMETIDA TELEFÓNICA 1/2" ML 25,815 25,815 25,815 25,815 25,815 25,815 25,815 25,815 25,815 25,815
21.45 ACOMETIDA TELEFÓNICA 1" ML 37,283 37,283 37,283 37,283 37,283 37,283 37,283 37,283 37,283 37,283
21.46 ACOMETIDA TELEVISIÓN 1" RG6" ML 22,031 22,031 22,031 22,031 22,031 22,031 22,031 22,031 22,031 22,031
21.47 CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 17,219 17,219 17,219 17,219 17,219 17,219 17,219 17,219 17,219 17,219
21.48 BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 680,194 680,194 680,194 680,194 680,194 680,194 680,194 680,194 680,194 680,194
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

CONSTRUCCIÓN
URBANISMO
1 ACUEDUCTO
1.1 CODO 45 PVC UNIÓN MECÁNICA 2" UN 29,977 29,977 29,977 29,977 29,977 29,977 29,977 29,977 29,977 29,977
1.2 CODO 45 PVC UNIÓN MECÁNICA 4" UN 99,691 99,691 99,691 99,691 99,691 99,691 99,691 99,691 99,691 99,691
1.3 CODO 45 PVC UNIÓN MECÁNICA 8" UN 559,246 559,246 559,246 559,246 559,246 559,246 559,246 559,246 559,246 559,246
1.4 CODO 45 PVC UNIÓN MECÁNICA 10" UN 1,193,488 1,193,488 1,193,488 1,193,488 1,193,488 1,193,488 1,193,488 1,193,488 1,193,488 1,193,488
1.5 CODO 90 PVC UNIÓN MECÁNICA 4" UN 137,147 137,147 137,147 137,147 137,147 137,147 137,147 137,147 137,147 137,147
1.6 CODO 90 PVC UNIÓN MECÁNICA 8" UN 832,940 832,940 832,940 832,940 832,940 832,940 832,940 832,940 832,940 832,940
1.7 CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,791,160 1,791,160 1,791,160 1,791,160 1,791,160 1,791,160 1,791,160 1,791,160 1,791,160 1,791,160
1.8 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 14,764 14,764 14,764 14,764 14,764 14,764 14,764 14,764 14,764 14,764
1.9 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 18,098 18,098 18,098 18,098 18,098 18,098 18,098 18,098 18,098 18,098
1.10 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 22,602 22,602 22,602 22,602 22,602 22,602 22,602 22,602 22,602 22,602
1.11 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 24,693 24,693 24,693 24,693 24,693 24,693 24,693 24,693 24,693 24,693
1.12 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 29,508 29,508 29,508 29,508 29,508 29,508 29,508 29,508 29,508 29,508
1.13 COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 29,508 29,508 29,508 29,508 29,508 29,508 29,508 29,508 29,508 29,508
1.14 TAPÓN PVC UNIÓN MECÁNICA 3" UN 117,060 117,060 117,060 117,060 117,060 117,060 117,060 117,060 117,060 117,060
1.15 TAPÓN PVC UNIÓN MECÁNICA 4" UN 135,653 135,653 135,653 135,653 135,653 135,653 135,653 135,653 135,653 135,653
1.16 TAPÓN PVC UNIÓN MECÁNICA 8" UN 419,520 419,520 419,520 419,520 419,520 419,520 419,520 419,520 419,520 419,520
1.17 TEE PVC UNIÓN MECÁNICA 2" UN 157,444 157,444 157,444 157,444 157,444 157,444 157,444 157,444 157,444 157,444
1.18 TEE PVC UNIÓN MECÁNICA 4" UN 259,550 259,550 259,550 259,550 259,550 259,550 259,550 259,550 259,550 259,550
1.19 TEE PVC UNIÓN MECÁNICA 8" UN 1,147,069 1,147,069 1,147,069 1,147,069 1,147,069 1,147,069 1,147,069 1,147,069 1,147,069 1,147,069
1.20 TEE PVC UNIÓN MECÁNICA 10" UN 1,321,408 1,321,408 1,321,408 1,321,408 1,321,408 1,321,408 1,321,408 1,321,408 1,321,408 1,321,408
1.21 TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 15,853 15,853 15,853 15,853 15,853 15,853 15,853 15,853 15,853 15,853
1.22 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 14,032 14,032 14,032 14,032 14,032 14,032 14,032 14,032 14,032 14,032
1.23 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 33,799 33,799 33,799 33,799 33,799 33,799 33,799 33,799 33,799 33,799
1.24 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 135,119 135,119 135,119 135,119 135,119 135,119 135,119 135,119 135,119 135,119
1.25 TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 200,613 200,613 200,613 200,613 200,613 200,613 200,613 200,613 200,613 200,613
1.26 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 33,075 33,075 33,075 33,075 33,075 33,075 33,075 33,075 33,075 33,075
1.27 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 113,473 113,473 113,473 113,473 113,473 113,473 113,473 113,473 113,473 113,473
1.28 TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 167,560 167,560 167,560 167,560 167,560 167,560 167,560 167,560 167,560 167,560
1.29 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 33,300 33,300 33,300 33,300 33,300 33,300 33,300 33,300 33,300 33,300
1.30 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 68,517 68,517 68,517 68,517 68,517 68,517 68,517 68,517 68,517 68,517
1.31 UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 274,721 274,721 274,721 274,721 274,721 274,721 274,721 274,721 274,721 274,721
1.32 UNIÓN REPARACION PVC 4" UN 79,840 79,840 79,840 79,840 79,840 79,840 79,840 79,840 79,840 79,840
1.33 UNIÓN REPARACIÓN PVC 8" UN 319,431 319,431 319,431 319,431 319,431 319,431 319,431 319,431 319,431 319,431
1.34 UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 192,980 192,980 192,980 192,980 192,980 192,980 192,980 192,980 192,980 192,980
1.35 UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 545,201 545,201 545,201 545,201 545,201 545,201 545,201 545,201 545,201 545,201
1.36 VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,455,229 1,455,229 1,455,229 1,455,229 1,455,229 1,455,229 1,455,229 1,455,229 1,455,229 1,455,229
1.37 VÁLVULA COMPUERTA ELÁSTICA 8" UN 2,150,036 2,150,036 2,150,036 2,150,036 2,150,036 2,150,036 2,150,036 2,150,036 2,150,036 2,150,036
2 ALCANTARILLADO - EXCAVACIONES
2.1 ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 12,293 12,293 12,293 12,293 12,293 12,293 12,293 12,293 12,293 12,293
2.2 ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 28,183 28,183 28,183 28,183 28,183 28,183 28,183 28,183 28,183 28,183
2.3 RELLENO CON MATERIAL DE EXCAVACIÓN M3 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487 21,487
2.4 RELLENO TIPO 1 "GRAVILLA" M3 102,796 151,136 93,468 115,517 123,997 98,556 111,277 99,403 103,644 140,111
2.5 RELLENO TIPO 2 "RECEBO" M3 76,292 130,619 85,347 121,565 101,645 101,645 119,754 96,212 67,238 121,565
2.6 RELLENO TIPO 4 "SUBBASE B-200" M3 75,777 130,104 84,832 121,050 101,130 101,130 119,239 95,697 75,777 121,050
2.7 RELLENO TIPO 5 "TRITURADO GRUESO" M3 116,207 134,654 114,157 117,232 134,654 114,157 137,729 114,157 118,256 143,878
2.8 RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 62,055 80,860 59,965 63,100 80,860 59,965 83,995 59,965 64,144 90,263
2.9 RELLENO TIPO 7 "ARENA DE PEÑA" M3 128,863 184,723 118,083 143,563 153,363 123,963 138,664 124,943 129,843 171,983
3 ALCANTARILLADO - TUBERÍA
3.1 CODO 45 PVC ALCANTARILLADO 8" UN 125,109 125,109 125,109 125,109 125,109 125,109 125,109 125,109 125,109 125,109
3.2 CODO 45 PVC ALCANTARILLADO 16" UN 1,301,159 1,301,159 1,301,159 1,301,159 1,301,159 1,301,159 1,301,159 1,301,159 1,301,159 1,301,159
3.3 CODO 90 PVC ALCANTARILLADO 8" UN 163,389 163,389 163,389 163,389 163,389 163,389 163,389 163,389 163,389 163,389
3.4 CODO 90 PVC ALCANTARILLADO 16" UN 1,506,998 1,506,998 1,506,998 1,506,998 1,506,998 1,506,998 1,506,998 1,506,998 1,506,998 1,506,998
3.5 CODO 90 PVC ALCANTARILLADO 24" UN 1,050,628 1,050,628 1,050,628 1,050,628 1,050,628 1,050,628 1,050,628 1,050,628 1,050,628 1,050,628
3.6 SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 64,442 64,442 64,442 64,442 64,442 64,442 64,442 64,442 64,442 64,442
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

3.7 SILLA TEE PVC ALCANTARILLADO 10 X 6" UN CONSTRUCCIÓN


124,198 124,198 124,198 124,198 124,198 124,198 124,198 124,198 124,198 124,198
3.8 SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902
3.9 SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 292,895 292,895 292,895 292,895 292,895 292,895 292,895 292,895 292,895 292,895
3.10 SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 470,067 470,067 470,067 470,067 470,067 470,067 470,067 470,067 470,067 470,067
3.11 SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 124,251 124,251 124,251 124,251 124,251 124,251 124,251 124,251 124,251 124,251
3.12 SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 124,251 124,251 124,251 124,251 124,251 124,251 124,251 124,251 124,251 124,251
3.13 SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902
3.14 SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902 292,902
3.15 SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 470,067 470,067 470,067 470,067 470,067 470,067 470,067 470,067 470,067 470,067
3.16 TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 472,376 472,376 472,376 472,376 472,376 472,376 472,376 472,376 472,376 472,376
3.17 TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 766,415 766,415 766,415 766,415 766,415 766,415 766,415 766,415 766,415 766,415
3.18 TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 1,229,973 1,229,973 1,229,973 1,229,973 1,229,973 1,229,973 1,229,973 1,229,973 1,229,973 1,229,973
3.19 TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 76,295 76,295 76,295 76,295 76,295 76,295 76,295 76,295 76,295 76,295
3.20 TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 395,441 395,441 395,441 395,441 395,441 395,441 395,441 395,441 395,441 395,441
3.21 TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 443,478 443,478 443,478 443,478 443,478 443,478 443,478 443,478 443,478 443,478
3.22 TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 1,225,229 1,225,229 1,225,229 1,225,229 1,225,229 1,225,229 1,225,229 1,225,229 1,225,229 1,225,229
3.23 TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 72,320 72,896 72,209 72,471 72,572 72,269 72,421 72,279 72,330 72,764
3.24 TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 358,573 358,573 358,573 358,573 358,573 358,573 358,573 358,573 358,573 358,573
3.25 TUBERÍA PVC ALCANTARILLADO 8" ML 54,771 54,771 54,771 54,771 54,771 54,771 54,771 54,771 54,771 54,771
3.26 TUBERÍA PVC ALCANTARILLADO 10" ML 77,323 77,323 77,323 77,323 77,323 77,323 77,323 77,323 77,323 77,323
3.27 TUBERÍA PVC ALCANTARILLADO 12" ML 111,430 111,430 111,430 111,430 111,430 111,430 111,430 111,430 111,430 111,430
3.28 TUBERÍA PVC ALCANTARILLADO 16" ML 170,976 170,976 170,976 170,976 170,976 170,976 170,976 170,976 170,976 170,976
3.29 TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 274,493 274,493 274,493 274,493 274,493 274,493 274,493 274,493 274,493 274,493
3.30 TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 398,176 398,176 398,176 398,176 398,176 398,176 398,176 398,176 398,176 398,176
3.31 TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 503,843 503,843 503,843 503,843 503,843 503,843 503,843 503,843 503,843 503,843
3.32 TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 662,487 662,487 662,487 662,487 662,487 662,487 662,487 662,487 662,487 662,487
3.33 TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 1,203,334 1,203,334 1,203,334 1,203,334 1,203,334 1,203,334 1,203,334 1,203,334 1,203,334 1,203,334
4 ALCANTARILLADO - SUMIDEROS Y POZOS
PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
4.1 UN 956,692 993,331 949,622 966,334 972,762 953,479 963,121 954,121 957,335 984,976
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.
4.2 ML 718,718 737,291 715,134 723,606 726,864 717,089 721,976 717,415 719,044 733,055
PAÑETE INTERNO E=1.5CM Y CAÑUELA)
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
4.3 UN 887,390 911,816 882,677 893,818 898,104 885,248 891,676 885,676 887,819 906,246
(INCLUYE ARO Y TAPA HF)
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
4.4 UN 1,143,572 1,189,371 1,134,734 1,155,625 1,163,659 1,139,555 1,151,608 1,140,358 1,144,376 1,178,926
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
4.5 ML 1,013,370 1,039,524 1,008,323 1,020,253 1,024,841 1,011,076 1,017,958 1,011,535 1,013,829 1,033,559
PAÑETE INTERNO E=1.5CM Y CAÑUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
4.6 UN 1,045,969 1,079,555 1,039,488 1,054,808 1,060,700 1,043,024 1,051,862 1,043,613 1,046,559 1,071,896
REFUERZO (INCLUYE ARO Y TAPA HF)
4.7 SUMIDERO EN LADRILLO SL-100 UN 1,127,268 1,144,329 1,123,975 1,131,758 1,134,751 1,125,771 1,130,261 1,126,069 1,127,566 1,140,440
4.8 SUMIDERO EN LADRILLO SL-250 UN 1,630,139 1,680,662 1,620,390 1,643,435 1,652,299 1,625,707 1,639,003 1,626,592 1,631,024 1,669,143
4.9 SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 2,457,776 2,555,452 2,438,926 2,483,480 2,500,617 2,449,208 2,474,913 2,450,921 2,459,490 2,533,176
4.10 SUMIDERO FUNDIDO EN SITIO SL-250 UN 3,328,007 3,490,372 3,296,674 3,370,734 3,399,220 3,313,765 3,356,493 3,316,612 3,330,856 3,453,343
4.11 SUMIDERO PREFABRICADO SL-100 UN 2,011,666 2,011,666 2,011,666 2,011,666 2,011,666 2,011,666 2,011,666 2,011,666 2,011,666 2,011,666
4.12 SUMIDERO PREFABRICADO SL-250 UN 4,240,330 4,240,330 4,240,330 4,240,330 4,240,330 4,240,330 4,240,330 4,240,330 4,240,330 4,240,330
NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
4.13 UN 156,321 157,079 156,175 156,521 156,654 156,255 156,454 156,268 156,335 156,906
H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

5 ANDENES Y SARDINELES
5.1 ADOQUÍN DE ARCILLA 20X10X6CM M2 82,581 85,589 82,001 83,373 83,900 82,317 83,109 82,370 82,634 84,903
5.2 ADOQUÍN DE ARCILLA 20X10X8CM M2 97,245 100,253 96,665 98,037 98,564 96,981 97,773 97,034 97,298 99,567
5.3 ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 62,878 69,534 61,594 64,630 65,798 62,295 64,046 62,411 62,995 68,016
5.4 ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 67,744 74,156 66,507 69,431 70,556 67,182 68,869 67,294 67,857 72,694
5.5 ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 68,008 74,260 66,801 69,653 70,750 67,460 69,105 67,569 68,118 72,834
5.6 BORDE SEPARADOR VERDE A-170 ML 276,288 277,046 276,142 276,487 276,620 276,221 276,421 276,235 276,301 276,873
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

5.7 BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML CONSTRUCCIÓN


21,091 21,889 20,936 21,301 21,441 21,020 21,231 21,034 21,105 21,707
5.8 BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 45,093 49,784 44,188 46,328 47,151 44,682 45,916 44,764 45,176 48,715
5.9 CAÑUELA PREFABRICADA TIPO A-120 ML 91,943 92,348 91,865 92,050 92,121 91,908 92,014 91,915 91,950 92,256
5.10 CONTENEDOR DE RAÍCES TIPO A B-20 UN 617,404 629,209 615,125 620,510 622,581 616,368 619,475 616,575 617,610 626,517
5.11 LOSETA PREFABRICADA A-40 M2 68,707 70,442 68,372 69,164 69,468 68,555 69,012 68,585 68,738 70,046
5.12 LOSETA PREFABRICADA A-60 M2 98,861 100,595 98,526 99,317 99,621 98,708 99,165 98,739 98,891 100,200
5.13 SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 37,553 40,117 37,058 38,228 38,678 37,328 38,003 37,373 37,598 39,532

5.14 SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 60,156 65,347 59,154 61,522 62,433 59,701 61,067 59,792 60,247 64,163
5.15 SARDINEL PREFABRICADO A-10 ML 112,656 123,176 115,727 113,524 122,749 117,760 121,847 115,180 118,798 123,084
5.16 TABLETA PREFABRICADA A-20 (20X20CM ) M2 66,313 67,362 66,110 66,589 66,773 66,220 66,497 66,239 66,331 67,123

6 MOBILIARIO URBANO
6.1 BANCA EN CONCRETO M-40 UN 223,083 226,136 222,494 223,886 224,422 222,815 223,619 222,869 223,136 225,440
6.2 BANCA EN CONCRETO M-30 UN 727,495 731,770 726,670 728,620 729,370 727,120 728,245 727,195 727,570 730,795
6.3 BOLARDO M-63 ALTO/HIERRO UN 236,067 236,710 235,943 236,237 236,349 236,011 236,180 236,022 236,079 236,564
6.4 BOLARDO M-60 CONCRETO UN 179,127 182,791 178,420 180,092 180,734 178,806 179,770 178,870 179,192 181,956
6.5 BOLARDO M-61 BAJO/CONCRETO UN 181,299 184,963 180,592 182,264 182,906 180,978 181,942 181,042 181,364 184,128
6.6 BOLARDO M-62 BAJO/HIERRO UN 211,817 215,674 211,073 212,832 213,509 211,479 212,494 211,547 211,885 214,795
6.7 BORDE CONTENEDOR DE RAICES A-70 ML 66,996 69,299 66,552 67,602 68,006 66,794 67,400 66,834 67,036 68,774
6.8 BORDILLO PREFABRICADO A-80 ML 75,808 78,386 75,310 76,486 76,938 75,582 76,260 75,627 75,853 77,798
6.9 CANECA M-120 UN 340,140 340,715 340,028 340,291 340,392 340,089 340,241 340,099 340,150 340,584
6.10 CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 897,397 899,229 897,044 897,879 898,201 897,236 897,718 897,268 897,429 898,811
6.11 HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3,665,995 3,667,217 3,665,760 3,666,317 3,666,531 3,665,888 3,666,210 3,665,910 3,666,017 3,666,938
6.12 HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 3,771,069 3,772,291 3,770,834 3,771,391 3,771,605 3,770,962 3,771,284 3,770,984 3,771,091 3,772,012
6.13 CICLOPARQUEADERO M100 TIPO 1 UN 528,170 529,455 527,921 528,508 528,734 528,057 528,395 528,079 528,192 529,162
6.14 CICLOPARQUEADERO M101 TIPO 2 UN 700,074 705,218 699,082 701,428 702,330 699,623 700,977 699,714 700,165 704,045
6.15 BANCA EN MADERA M-50 UN 581,852 581,852 581,852 581,852 581,852 581,852 581,852 581,852 581,852 581,852
6.16 PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 272,856 274,688 272,502 273,338 273,659 272,695 273,177 272,727 272,888 274,270
6.17 PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 625,895 627,335 625,617 626,274 626,526 625,769 626,148 625,794 625,920 627,006
6.18 POSTE HISTÓRICO M-131 UN 6,964,890 6,974,049 6,963,122 6,967,300 6,968,907 6,964,086 6,966,497 6,964,247 6,965,050 6,971,960

7 SEÑALIZACIÓN
7.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375
7.2 MARCA VIAL CON PINTURA EN FRÍO M2 47,334 47,334 47,334 47,334 47,334 47,334 47,334 47,334 47,334 47,334
7.3 SEÑAL DOBLE DE CICLORUTA UN 341,777 342,156 341,704 341,877 341,943 341,744 341,844 341,750 341,784 342,070
7.4 SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 537,665 540,236 537,168 538,341 538,792 537,439 538,116 537,484 537,710 539,650
7.5 SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 256,041 256,420 255,967 256,140 256,207 256,007 256,107 256,014 256,047 256,333
7.6 SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 271,805 272,184 271,731 271,904 271,971 271,771 271,871 271,778 271,811 272,097
7.7 SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 283,743 284,122 283,669 283,842 283,909 283,709 283,809 283,716 283,749 284,035
7.8 TACHAS REFLECTIVAS UN 14,735 14,735 14,735 14,735 14,735 14,735 14,735 14,735 14,735 14,735
7.9 SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 15,728 15,728 15,728 15,728 15,728 15,728 15,728 15,728 15,728 15,728
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
7.10 UN 128,066 128,066 128,066 128,066 128,066 128,066 128,066 128,066 128,066 128,066
SUMINISTRO E INSTALACIÓN)
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

CONSTRUCCIÓN
VÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)
1 NORMA INV PRELIMILARES
DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
1.1 201 P M3 165,498 165,498 165,498 165,498 165,498 165,498 165,498 165,498 165,498 165,498
SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
1.2 201 P M3 58,032 58,032 58,032 58,032 58,032 58,032 58,032 58,032 58,032 58,032
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
1.3 200.1 HA 2,816,609 2,816,609 2,816,609 2,816,609 2,816,609 2,816,609 2,816,609 2,816,609 2,816,609 2,816,609
SOBRANTES A UNA DISTANCIA DE 5KM)
DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
1.4 200.2 HA 1,023,831 1,023,831 1,023,831 1,023,831 1,023,831 1,023,831 1,023,831 1,023,831 1,023,831 1,023,831
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)
DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
1.5 201.7 M3 96,806 96,806 96,806 96,806 96,806 96,806 96,806 96,806 96,806 96,806
SOBRANTES A UNA DISTANCIA DE 5KM)
TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
1.6 *** M3-KM 1,393 1,393 1,393 1,393 1,393 1,393 1,393 1,393 1,393 1,393
PRESTAMOS, SOBREACARREOS Y DERRUMBES

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES


EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
2.1 210.1.1 M3 10,286 10,286 10,286 10,286 10,286 10,286 10,286 10,286 10,286 10,286
PRÉSTAMOS

2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 37,207 37,207 37,207 37,207 37,207 37,207 37,207 37,207 37,207 37,207
EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
2.3 210.2.2 M3 9,431 9,431 9,431 9,431 9,431 9,431 9,431 9,431 9,431 9,431
PRÉSTAMOS
2.4 220.1 TERRAPLENES M3 16,027 16,027 16,027 16,027 16,027 16,027 16,027 16,027 16,027 16,027
2.5 221.1 PEDRAPLÉN COMPACTO M3 14,022 14,022 14,022 14,022 14,022 14,022 14,022 14,022 14,022 14,022
2.6 221.2 PEDRAPLÉN SUELTO M3 8,065 8,065 8,065 8,065 8,065 8,065 8,065 8,065 8,065 8,065
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
2.7 230.1 M2 517 517 517 517 517 517 517 517 517 517
EXISTENTE
MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
2.8 230.2 M3 13,784 13,784 13,784 13,784 13,784 13,784 13,784 13,784 13,784 13,784
MATERIAL ADICIONADO
EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
2.9 600.1 M3 22,385 22,385 22,385 22,385 22,385 22,385 22,385 22,385 22,385 22,385
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
2.10 600.2 M3 68,884 68,884 68,884 68,884 68,884 68,884 68,884 68,884 68,884 68,884
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
2.11 600.3 M3 84,969 84,969 84,969 84,969 84,969 84,969 84,969 84,969 84,969 84,969
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO
2.12 600.4 M3 20,344 20,344 20,344 20,344 20,344 20,344 20,344 20,344 20,344 20,344
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE


2.13 600.4 P M3 44,785 44,785 44,785 44,785 44,785 44,785 44,785 44,785 44,785 44,785
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE


2.14 600.5 M3 33,485 33,485 33,485 33,485 33,485 33,485 33,485 33,485 33,485 33,485
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO


2.15 600.5 P M3 60,745 60,745 60,745 60,745 60,745 60,745 60,745 60,745 60,745 60,745
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

3 NORMA INV ESTRUCTURA DE PAVIMENTO


3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 5,858 5,858 5,858 5,858 5,858 5,858 5,858 5,858 5,858 5,858
3.2 320.1 SUBBASE GRANULAR M3 170,724 249,913 186,532 164,801 248,102 204,641 240,859 181,099 213,695 249,913
3.3 330.1 BASE GRANULAR M3 196,113 279,964 216,583 194,852 278,153 234,692 270,910 211,150 243,746 279,964
EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
3.4 365.1 M3 149,801 149,801 149,801 149,801 149,801 149,801 149,801 149,801 149,801 149,801
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 3,484 3,484 3,484 3,484 3,484 3,484 3,484 3,484 3,484 3,484
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1,212 1,212 1,212 1,212 1,212 1,212 1,212 1,212 1,212 1,212
PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
3.7 461.1 M3 245,128 258,248 242,596 248,580 250,882 243,977 247,430 244,207 245,358 255,256
ASFÁLTICA
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 CONSTRUCCIÓN


71,860 74,690 71,314 72,605 73,102 71,612 72,357 71,662 71,910 74,045
MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO
3.9 450.1 P M3 761,843 789,703 763,584 702,641 739,207 779,256 754,878 775,773 733,983 765,326
ASFÁLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO
3.10 450.2 P M3 769,403 797,263 771,144 710,201 746,767 786,816 762,438 783,333 741,543 772,886
ASFÁLTICO)
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
3.11 450.9 P M3 812,098 839,958 813,839 752,895 789,461 829,510 805,133 826,028 784,238 815,580
ASFÁLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO
3.12 450.3 P M3 799,646 827,506 801,387 740,443 777,009 817,058 792,681 813,576 771,786 803,128
ASFÁLTICO)
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 356,115 439,966 376,584 354,854 438,155 394,693 430,911 371,152 403,748 439,966
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 329,481 408,670 345,289 323,558 406,859 363,398 399,616 339,856 372,452 408,670
3.15 311.1 AFIRMADO M3 69,373 123,700 78,427 114,645 94,725 94,725 112,834 89,293 69,373 114,645
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 12,791 13,712 12,613 13,033 13,195 12,710 12,952 12,726 12,807 13,502
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 5,163 5,623 5,074 5,284 5,365 5,123 5,244 5,131 5,171 5,518
CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
3.18 500.1 M3 730,567 789,555 719,184 746,090 756,439 725,393 740,916 726,427 731,602 776,102
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE
3.19 500.1 M3 765,545 827,174 753,652 781,763 792,575 760,139 776,357 761,220 766,626 813,119
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE
3.20 500.1 M3 788,914 852,345 776,674 805,607 816,735 783,350 800,043 784,463 790,028 837,879
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
3.21 *** ML 7,956 7,956 7,956 7,956 7,956 7,956 7,956 7,956 7,956 7,956
LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 94,184 121,766 91,120 95,716 121,766 91,120 126,362 91,120 97,249 135,556
3.23 442 MEZCLA ASFALTICA NATURAL M3 454,292 489,765 443,791 435,430 436,199 458,618 450,352 456,575 460,492 465,686
3.24 *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 47,064 47,064 47,064 47,064 47,064 47,064 47,064 47,064 47,064 47,064
3.25 *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 185,292 185,292 185,292 185,292 185,292 185,292 185,292 185,292 185,292 185,292
4 NORMA INV OBRAS DE ARTE
4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 1,017,300 1,084,212 1,004,388 1,034,909 1,046,648 1,011,431 1,029,039 1,012,604 1,018,474 1,068,952
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 872,506 938,309 859,809 889,823 901,367 866,734 884,051 867,889 873,662 923,302
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 925,550 993,958 912,349 943,552 955,554 919,549 937,551 920,749 926,751 978,358
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 631,501 691,643 619,896 647,328 657,880 626,226 642,053 627,281 632,557 677,927
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 740,839 803,362 728,773 757,292 768,261 735,354 751,808 736,451 741,936 789,103
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 628,961 690,637 617,059 645,192 656,012 623,552 639,782 624,633 630,044 676,572
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 738,198 802,316 725,825 755,071 766,320 732,574 749,448 733,699 739,323 787,694
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 805,677 867,352 793,775 821,907 832,727 800,267 816,498 801,349 806,759 853,287
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 650,408 714,526 638,035 667,281 678,530 644,784 661,658 645,909 651,534 699,904
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 856,074 920,192 843,700 872,947 884,196 850,450 867,323 851,574 857,199 905,569
SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.11 650 P KG 16,225 16,225 16,225 16,225 16,225 16,225 16,225 16,225 16,225 16,225
ACERO A-36
SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
4.12 650 P KG 19,944 19,944 19,944 19,944 19,944 19,944 19,944 19,944 19,944 19,944
ACERO A-588 GRADO B
4.13 641.1 ACERO DE PREESFUERZO TON-M 2,055 2,055 2,055 2,055 2,055 2,055 2,055 2,055 2,055 2,055
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
4.14 621.1 ML 3,559,612 3,559,612 3,559,612 3,559,612 3,559,612 3,559,612 3,559,612 3,559,612 3,559,612 3,559,612
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN
4.15 621.1 P MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, ML 5,244,872 5,359,327 5,222,785 5,274,992 5,295,072 5,234,832 5,264,952 5,236,839 5,246,881 5,333,224
REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
4.16 621.2 M3 2,025,092 2,086,157 2,013,308 2,041,162 2,051,875 2,019,736 2,035,806 2,020,807 2,026,164 2,072,231
REFUERZO)
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 95,529 95,529 95,529 95,529 95,529 95,529 95,529 95,529 95,529 95,529
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 531,513 538,841 530,099 533,441 534,727 530,870 532,798 530,999 531,641 537,169
4.19 632 P BARANDA METÁLICA ML 466,677 466,677 466,677 466,677 466,677 466,677 466,677 466,677 466,677 466,677
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 18,626 18,626 18,626 18,626 18,626 18,626 18,626 18,626 18,626 18,626
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 526,884 625,609 519,857 571,927 571,123 536,759 565,084 534,560 528,031 605,146
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 135,962 163,543 132,897 137,494 163,543 132,897 168,140 132,897 139,026 177,334
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 81,293 131,441 89,651 123,083 104,696 104,696 121,412 99,681 72,935 123,083
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 421,493 486,424 408,963 438,580 449,972 415,797 432,885 416,937 422,633 471,615
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3
CONSTRUCCIÓN
404,019 452,622 395,461 414,727 430,967 399,521 422,488 400,198 405,811 448,839
CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
4.26 630.7 M3 412,726 461,328 404,168 423,434 439,673 408,228 431,194 408,905 414,517 457,546
ELEVACIONES
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 419,769 467,833 411,315 430,335 446,480 415,318 438,142 415,985 421,551 464,173
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 428,475 476,539 420,021 439,041 455,186 424,025 446,849 424,691 430,257 472,880
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 576,023 640,048 563,668 592,872 604,104 570,407 587,255 571,529 577,147 625,446
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 683,406 749,966 670,562 700,922 712,599 677,568 695,083 678,734 684,574 734,786
4.31 681.1 GAVIÓN M3 193,336 219,664 190,411 194,799 219,664 190,411 224,052 190,411 196,262 232,828
4.32 681.1 GAVIÓN MALLA PVC M3 197,836 224,164 194,911 199,299 224,164 194,911 228,552 194,911 200,762 237,328
BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
4.33 672.1 ML 47,642 51,572 46,884 48,677 49,366 47,298 48,332 47,366 47,711 50,676
2500 PSI
BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,
4.34 672.1 ML 18,148 20,113 17,769 18,665 19,010 17,975 18,492 18,010 18,182 19,665
2500 PSI
SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
4.35 *** M2 11,131 11,131 11,131 11,131 11,131 11,131 11,131 11,131 11,131 11,131
(RESISTENCIA ÚLTIMA 25 KN)

4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 15,776 15,776 15,776 15,776 15,776 15,776 15,776 15,776 15,776 15,776

4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 21,155 21,155 21,155 21,155 21,155 21,155 21,155 21,155 21,155 21,155
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.38 *** M2 25,316 25,316 25,316 25,316 25,316 25,316 25,316 25,316 25,316 25,316
(RESISTENCIA ÚLTIMA 100 KN)
SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
4.39 *** M2 32,470 32,470 32,470 32,470 32,470 32,470 32,470 32,470 32,470 32,470
(RESISTENCIA ÚLTIMA 165 KN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800
4.40 *** M2 7,988 7,988 7,988 7,988 7,988 7,988 7,988 7,988 7,988 7,988
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000
4.41 *** M2 9,080 9,080 9,080 9,080 9,080 9,080 9,080 9,080 9,080 9,080
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500
4.42 *** M2 9,431 9,431 9,431 9,431 9,431 9,431 9,431 9,431 9,431 9,431
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,
4.43 *** M2 6,765 6,765 6,765 6,765 6,765 6,765 6,765 6,765 6,765 6,765
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,
4.44 *** M2 10,109 10,109 10,109 10,109 10,109 10,109 10,109 10,109 10,109 10,109
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,
4.45 *** M2 8,272 8,272 8,272 8,272 8,272 8,272 8,272 8,272 8,272 8,272
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN,
4.46 *** M2 10,109 10,109 10,109 10,109 10,109 10,109 10,109 10,109 10,109 10,109
FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000
4.47 *** M2 19,275 19,275 19,275 19,275 19,275 19,275 19,275 19,275 19,275 19,275
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO
4.48 661.1 ML 687,315 688,245 687,136 687,560 687,723 687,233 687,478 687,250 687,331 688,033
Ø=36" CLASE I, INCLUYE EMBOQUILLADA
SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
4.49 660.3 ML 392,745 406,361 390,118 396,328 398,717 391,551 395,134 391,790 392,984 403,256
DIÁMETRO 600 MM
SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,
4.50 *** ML 1,251,637 1,251,637 1,251,637 1,251,637 1,251,637 1,251,637 1,251,637 1,251,637 1,251,637 1,251,637
DIÁMETRO 36"
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 144,399 196,637 153,106 187,931 168,777 168,777 186,189 163,553 144,399 187,931
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086 8,086
GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
4.53 *** ML 93,215 93,215 93,215 93,215 93,215 93,215 93,215 93,215 93,215 93,215
INSTALACIÓN)
GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
4.54 *** ML 141,973 141,973 141,973 141,973 141,973 141,973 141,973 141,973 141,973 141,973
INSTALACIÓN)
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 578,773 645,333 565,929 596,289 607,966 572,935 590,450 574,101 579,941 630,153
4.56 682.1 P COLCHONETA RENO M3 211,501 237,829 208,576 212,964 237,829 208,576 242,217 208,576 214,426 250,993
4.57 *** TRINCHO EN MADERA M2 73,913 73,913 73,913 73,913 73,913 73,913 73,913 73,913 73,913 73,913
4.58 *** CUNETAS DE CORONACIÓN PREEMSABLADA ALVEOLAR CON GEOTEXTIL ML 0 0 0 0 0 0 0 0 0 0
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2021)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM DESCRIPCIÓN UNIDAD Arbelaéz Cabrera Fusagasuga Granada Pandi Pasca San_Bernardo Silvanía Tibacuy Venecia

4.59 *** FILTRO LATERAL DE VIA ALVEOLAR IMPERMEABLE ML CONSTRUCCIÓN


0 0 0 0 0 0 0 0 0 0

5 NORMA INV SEÑALIZACIÓN


5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 47,334 47,334 47,334 47,334 47,334 47,334 47,334 47,334 47,334 47,334
5.3 730.3 TOPE DEFENSA METÁLICA UN 90,980 90,980 90,980 90,980 90,980 90,980 90,980 90,980 90,980 90,980
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 75,767 75,767 75,767 75,767 75,767 75,767 75,767 75,767 75,767 75,767
5.5 730.1 DEFENSA METÁLICA ML 161,397 164,619 160,775 162,245 162,810 161,114 161,962 161,171 161,453 163,884
SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
5.6 701.1 UN 14,735 14,735 14,735 14,735 14,735 14,735 14,735 14,735 14,735 14,735
UNIDIRECCIONALES

6 NORMA INV MANTENIMIENTO VIAL


6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 906 906 906 906 906 906 906 906 906 906
LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
6.2 801.6 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UN 153,313 153,313 153,313 153,313 153,313 153,313 153,313 153,313 153,313 153,313
UNA DISTANCIA DE 5 KM

LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE


6.3 801.7 ML 29,627 29,627 29,627 29,627 29,627 29,627 29,627 29,627 29,627 29,627
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

6.4 211.1 REMOCIÓN DE DERRUMBES M3 8,962 8,962 8,962 8,962 8,962 8,962 8,962 8,962 8,962 8,962
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 515,425 515,425 515,425 515,425 515,425 515,425 515,425 515,425 515,425 515,425
LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
6.6 801.4 M2 1,923 1,923 1,923 1,923 1,923 1,923 1,923 1,923 1,923 1,923
SOBRANTES A UNA DISTANCIA DE 5 KM)
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 16,996 16,996 16,996 16,996 16,996 16,996 16,996 16,996 16,996 16,996
6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 11,130 11,130 11,130 11,130 11,130 11,130 11,130 11,130 11,130 11,130

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS
RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.