Vc DE ACERO = 27M/MIN D = 6.50m≈165.1mm
Vc 1000 ( 27 )( 1000 )
Rpm = = =51 rpm
Dπ ( 165.1 ) ( 3.1416 )
PENETRACION DE CORTE
Di−Df (6.01)(5.8)
d=
2
= =58rpm
2
N=VELOCIDAD DE CORTE
Vc 27 m/min
(
1 rev
)
W= R = 0.082 =329.26 2 πrad =582.26 rpm
V = (27m/min)(1.25mm/rev)(2.54min) = 95.26mm3
Subfase 3-desbaste
Subfase 4-desbaste
Vc para acero = 21m/min
Subfase 9-desbaste
350+800 575 m
Vc del acero 2
=
min
( 575 )( 1000 )
Rpm= =1601 rpm
( 114.3 )( π )
4.85−4.50
d= 2
=0.175∈≈ 4.445mm
L 89.154 MM
Tm= FN = (1.25 M / REV )(1601 RPM ) =0.044 mn≈ 2.64 seg
N=VELOCIDAD DE CORTE
575 m
(
W= Vc = mm =10087.71 1rev =16.56 rpm
R 0.057 m 2 πrad )
CANTIDAD DE MATERIAL REMOVIDO
V=(575m/mm)(1.25mm/rev)(9.445mm)=3199.84mm3
Subfase 11-desvaste
Vc del acero=575m/min
( 575 )( 1000 )
Rpm= =1135.12 rpm
( 161.24 ) ( π )
PENETRACION DE CORTE
6.50−6.35
d= 2
=0.075∈≈ 1.905 mm
L 43.18 MM
= =0.030 min ≈ 1.8 seg
( )
Tm= FN 1.25 M (1135 RPM )
REV
VELOCIDAD DE CORTE
575 m
(
W= Vc = mm =3571.5 1rev =568 rpm
R 0.161 m 2 πrad )
CANTIDAD DE MATERIAL REMOVIDO
V=(575m/mm)(1.25mm/rev)(1.905mm) = 1369.2mm3