Rev. 0
APROBADO POR:
CSL-214200-MC-356-6-002
TABLA DE CONTENIDO
1. RESUMEN ..................................................................................................................... 3
2. OBJETIVO..................................................................................................................... 3
3. ALCANCE ..................................................................................................................... 3
Página 2 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
1. RESUMEN
1.1 General
Aceros Arequipa – CAASA ha contratado a CESEL para el desarrollo del Proyecto “Servicio EPCM –
Nueva Planta de tubos para su nuevo centro de distribución y Steel center en Lurín ubicado en el
centro industrial Macropolis II, donde se desarrollará la construcción de la NUEVA PLANTA DE
TUBOS, donde se desarrollarán las operaciones de almacenamiento y despacho de productos
terminados principalmente, así como la unidad de carpintería metálica para la fabricación de tubos,
corte de planchas, etc.
2. OBJETIVO
La presente memoria de cálculo tiene como objetivo dimensionar la malla de puesta a tierra, tierra
para el Sistema Eléctrico de la nueva Planta para Fabricación de Tubos de Acero de propiedad de
Corporación Aceros Arequipa S.A (CAASA), para su Planta Industrial ubicada en centro industrial
Macropolis II, Lurín.
3. ALCANCE
4. DOCUMENTOS DE REFERENCIA
Código Descripción
Página 3 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
5. CÓDIGOS Y NORMAS
A menos que se indique lo contrario el diseño y selección cumple con la última revisión de
los códigos y estándares nacionales y extranjeros, así como con los estándares de
Marcobre S.A.
6. CRITERIOS DE DISEÑO
En general los criterios para el diseño de una malla para puesta a tierra son los
siguientes:
Página 4 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
Según las características del terreno, para el suelo húmedo, se estima un valor de
resistividad promedio de 2000 Ω.m. Para reducir esta resistividad será necesario
emplear tierra fina con una composición de sal, bentonita y agua, además de
cemento conductivo para los electrodos horizontales. Bajo estas condiciones se
empleará una resistividad de diseño de 186.15 Ω.m.
El tiempo de despeje de la falla monofásica es de 1 s.
Con la finalidad de mejorar la protección contra tensiones de toque y paso, en
algunos casos será necesario aplicar sobre la superficie del terreno una capa de 50
cm, como mínimo, piedra caliza limpia, la cual, para fines de cálculo, en base a la
tabla 7 del Standard 80 tendrá una resistividad mínima de 2000 Ω.m.
Impedancia de falla igual a cero.
Para el cálculo de las tensiones de toque y paso, el peso de las personas a considerar es de
70 kg.
Página 5 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
El suelo para la construcción presenta 2 capas (estratos) de terreno, para la primera capa
presentada del tipo de arena limosa presentando una resistividad de 500 ohm-m, hasta una
profundidad de 3 m y una segunda capa de roca fracturada con una resistividad de 2500
ohm-m.
Para reducir esta resistividad será necesario emplear tierra fina con una composición de sal,
bentonita y agua, además de cemento conductivo para los electrodos horizontales. Bajo
estas condiciones se empleará una resistividad de diseño de 186.15 ohm-m.
Para la simulación se ha considerado una falla a tierra del tipo empernada, lo que significa
que no hay ninguna impedancia entre el conductor de fase (o conductores de fase) y tierra,
obteniéndose valores máximos de corriente de falla a tierra.
Página 6 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
En las tablas 7-1 y 7-2 se muestran los datos necesarios para el dimensionamiento y cálculo
de la malla de puesta a tierra.
Página 7 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
En la figura 7-1 se muestra la imagen del diseño de la malla de puesta a tierra para la
Tubera 2
Software
RESULTADOS OBTENIDOS
ETAP
Resistencia de la malla RG Ω 0.076
Página 8 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
9. CONCLUSIONES Y RECOMENDACIONES
Los resultados de la simulación muestran que los valores de las tensiones de toque y paso, en las
instalaciones, son inferiores a las tensiones máximas tolerables calculadas con el Software ETAP
19.0.1 Power Station.
La disposición de los reticulados de las mallas de puesta a tierra analizadas, se ha realizado en función
a la ubicación de los equipos eléctricos para la nueva planta. Esta configuración es referencial y podría
sufrir modificaciones por efecto de la reubicación de los equipos. Sin embargo, se debe resguardar que
las dimensiones totales (longitud total de conductor de LT m y superficie total de At m2) de la malla de
puesta a tierra interconectada, no se vean reducidas por dichas modificaciones.
El valor de la resistencia de puesta a tierra obtenida con el Software ETAP Power Station, es
aproximadamente 0,76 Ω. A pesar de que el valor es relativamente bajo, se recomienda el uso de
cemento conductivo cuando la malla cruce losas de concreto, este valor deberá ser verificado por el
EPC a cargo del proyecto, verificando al término de la instalación e interconexión de la malla de tierra
proyectada.
Las uniones entre la malla proyectada deberán ser ejecutada con conductores de cobre de calibre 4/0
AWG (120 mm²) como se muestra en los planos CSL-214200-DWG-356-6-001 y CSL-214200-DWG-
356-6-002, idénticos y enterrados a la misma profundidad que los utilizados en la malla diseñada, y
separados a una distancia tal que se evite el corte simultáneo de ambas conexiones en un mismo
evento.
Se deberán hacer mediciones parciales de las malla a tierra de acuerdo al avance de las instalación de
la mismas. Una vez construida la malla, se deberá medir el valor de la resistencia de puesta a tierra de
la malla interconectada, por medio de la metodología de tres electrodos “fall of potentials” (NFPA-780) y
verificar que la resistencia medida sea igual o menor a la resistencia calculada.
La interconexión de esta malla, permitirá reducir aún más la resistencia equivalente de la malla
calculada, así como la tensión de toque y paso inclusive para corrientes de cortocircuito de mucha
mayor capacidad.
10. ANEXO
Página 9 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
Página 10 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
Página 11 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
Página 12 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
Página 13 de 14
MEMORIA DE CALCULO – SISTEMA DE MALLA A TIERRA
PROYECTO NUEVA PLANTA DE TUBOS
Página 14 de 14
Project: CAASA LURIN ETAP Page: 1
DISEÑO ELÉCTRICO
Frequency: 60,0
DISEÑO ELÉCTRICO
System Data
Total Sf Cp Tf Tc Ts Extended
Ambient Fault Division Projection for for Sizing for Plot Boundary
Freq. Weight Temp. Current Factor Factor Total Fault Ground Available Step Length
Hz kg °C kA X/R % % Duration Conductors Body Current ft ft
60,0 70 40.00 10.080 14.00 100.0 100.0 1.00 0.50 0.50 1.0 0.00
Soil Data
Clean limestone 2000.0 0.250 Moist soil 186.2 2.27 Moist soil 7.3
Material Constants
Resistivity of Thermal
r Factor Fusing Ground Conductor Capacity
Conductivity @ 20 °C K0 @ Temperature @ 20°C Per Unit Volume
Conductor/Rod Type % 1/°C 0 °C °C micro ohm.cm J/(cm³.°C)
Conductor Copper, commercial hard-drawn 97.0 0.00381 242.0 1084.0 1.78 3.42
Rod Copper, commercial hard-drawn 97.0 0.00381 242.0 1084.0 1.78 3.42
Conductor Data
From To
Length Insulated Cost
Label Type AWG/kcmil X Y Z X Y Z ft Yes/No $/ft
C1 Copper, commercial hard-drawn 4/0 16.41 72.15 1.00 710.41 72.14 1.00 694.01 NO 3.30
C10 Copper, commercial hard-drawn 4/0 1095.37 33.56 1.00 1245.57 33.56 1.00 150.21 NO 3.30
C100 Copper, commercial hard-drawn 4/0 767.76 53.41 1.00 767.76 37.00 1.00 16.40 NO 3.30
C101 Copper, commercial hard-drawn 4/0 1066.30 33.56 1.00 846.41 33.56 1.00 219.89 NO 3.30
C102 Copper, commercial hard-drawn 4/0 881.19 57.20 1.00 881.19 33.56 1.00 23.65 NO 3.30
C103 Copper, commercial hard-drawn 4/0 1080.75 115.26 1.00 1080.75 93.94 1.00 21.33 NO 3.30
C104 Copper, commercial hard-drawn 4/0 1014.15 111.65 1.00 1014.15 93.94 1.00 17.72 NO 3.30
C105 Copper, commercial hard-drawn 4/0 974.13 93.94 1.00 974.13 111.76 1.00 17.82 NO 3.30
C106 Copper, commercial hard-drawn 4/0 945.58 111.65 1.00 945.58 93.94 1.00 17.71 NO 3.30
C107 Copper, commercial hard-drawn 4/0 16.41 22.55 1.00 16.41 121.75 1.00 99.20 NO 3.30
C108 Copper, commercial hard-drawn 4/0 1111.79 121.75 1.00 1326.01 121.75 1.00 214.22 NO 3.30
C109 Copper, commercial hard-drawn 4/0 16.41 121.75 1.00 1111.79 121.75 1.00 1095.38 NO 3.30
C11 Copper, commercial hard-drawn 4/0 1058.59 136.88 1.00 1058.59 147.79 1.00 10.90 NO 3.30
C110 Copper, commercial hard-drawn 4/0 1040.31 22.49 1.00 1326.01 22.50 1.00 285.70 NO 3.30
C111 Copper, commercial hard-drawn 4/0 16.41 22.55 1.00 1040.31 22.49 1.00 1023.90 NO 3.30
Project: CAASA LURIN ETAP Page: 2
DISEÑO ELÉCTRICO
Conductor Data
From To
Length Insulated Cost
Label Type AWG/kcmil X Y Z X Y Z ft Yes/No $/ft
C112 Copper, commercial hard-drawn 4/0 1245.79 115.26 1.00 1060.08 115.26 1.00 185.71 NO 3.30
C113 Copper, commercial hard-drawn 4/0 1107.61 93.95 1.00 1107.60 115.28 1.00 21.33 NO 3.30
C114 Copper, commercial hard-drawn 4/0 1060.09 93.94 1.00 1060.08 115.26 1.00 21.33 NO 3.30
C115 Copper, commercial hard-drawn 4/0 1041.06 93.94 1.00 1041.05 111.65 1.00 17.72 NO 3.30
C116 Copper, commercial hard-drawn 4/0 879.64 92.95 1.00 879.64 111.65 1.00 18.70 NO 3.30
C117 Copper, commercial hard-drawn 4/0 1060.08 111.65 1.00 879.64 111.65 1.00 180.44 NO 3.30
C118 Copper, commercial hard-drawn 4/0 831.90 92.95 1.00 914.42 92.95 1.00 82.51 NO 3.30
C119 Copper, commercial hard-drawn 4/0 831.90 81.80 1.00 831.90 92.95 1.00 11.16 NO 3.30
C12 Copper, commercial hard-drawn 4/0 1058.59 129.25 1.00 1058.59 136.88 1.00 7.63 NO 3.30
C120 Copper, commercial hard-drawn 4/0 884.40 75.24 1.00 831.90 75.24 1.00 52.49 NO 3.30
C121 Copper, commercial hard-drawn 4/0 884.40 92.95 1.00 884.40 75.24 1.00 17.72 NO 3.30
C122 Copper, commercial hard-drawn 4/0 1107.61 93.94 1.00 914.42 93.94 1.00 193.19 NO 3.30
C123 Copper, commercial hard-drawn 4/0 914.42 111.65 1.00 914.42 92.95 1.00 18.70 NO 3.30
C13 Copper, commercial hard-drawn 4/0 787.35 92.95 1.00 710.41 92.95 1.00 76.94 NO 3.30
C14 Copper, commercial hard-drawn 4/0 822.80 129.25 1.00 772.65 129.25 1.00 50.14 NO 3.30
C15 Copper, commercial hard-drawn 4/0 772.65 129.25 1.00 772.65 151.17 1.00 21.92 NO 3.30
C16 Copper, commercial hard-drawn 4/0 772.65 129.25 1.00 772.65 121.75 1.00 7.50 NO 3.30
C17 Copper, commercial hard-drawn 4/0 822.80 151.17 1.00 772.65 151.17 1.00 50.14 NO 3.30
C18 Copper, commercial hard-drawn 4/0 787.35 53.41 1.00 787.35 121.75 1.00 68.34 NO 3.30
C19 Copper, commercial hard-drawn 4/0 1107.60 115.63 1.00 1107.60 121.75 1.00 6.12 NO 3.30
C2 Copper, commercial hard-drawn 4/0 144.62 22.53 1.00 144.62 121.75 1.00 99.22 NO 3.30
C20 Copper, commercial hard-drawn 4/0 974.13 111.76 1.00 974.13 121.75 1.00 9.99 NO 3.30
C21 Copper, commercial hard-drawn 4/0 831.90 92.95 1.00 831.90 121.75 1.00 28.80 NO 3.30
C22 Copper, commercial hard-drawn 4/0 58.51 22.55 1.00 58.51 121.75 1.00 99.20 NO 3.30
C23 Copper, commercial hard-drawn 4/0 710.41 75.25 1.00 710.41 121.75 1.00 46.50 NO 3.30
C24 Copper, commercial hard-drawn 4/0 787.35 37.00 1.00 787.35 27.91 1.00 9.10 NO 3.30
C25 Copper, commercial hard-drawn 4/0 884.43 19.14 1.00 878.03 19.14 1.00 6.40 NO 3.30
C26 Copper, commercial hard-drawn 4/0 878.03 19.14 1.00 878.03 22.56 1.00 3.42 NO 3.30
C27 Copper, commercial hard-drawn 4/0 1073.05 19.09 1.00 1079.45 19.09 1.00 6.40 NO 3.30
C28 Copper, commercial hard-drawn 4/0 1079.45 19.09 1.00 1079.45 22.50 1.00 3.42 NO 3.30
C29 Copper, commercial hard-drawn 4/0 1095.37 33.56 1.00 1095.37 22.50 1.00 11.05 NO 3.30
C3 Copper, commercial hard-drawn 4/0 243.04 22.53 1.00 243.04 121.75 1.00 99.22 NO 3.30
C30 Copper, commercial hard-drawn 4/0 974.13 33.56 1.00 974.13 22.51 1.00 11.05 NO 3.30
C31 Copper, commercial hard-drawn 4/0 1245.79 115.26 1.00 1245.79 104.89 1.00 10.38 NO 3.30
C32 Copper, commercial hard-drawn 4/0 742.77 53.41 1.00 742.77 35.60 1.00 17.81 NO 3.30
C33 Copper, commercial hard-drawn 4/0 831.90 75.24 1.00 831.90 81.80 1.00 6.56 NO 3.30
C34 Copper, commercial hard-drawn 4/0 899.80 129.25 1.00 899.79 121.79 1.00 7.46 NO 3.30
C35 Copper, commercial hard-drawn 4/0 969.06 129.25 1.00 969.06 121.75 1.00 7.50 NO 3.30
C36 Copper, commercial hard-drawn 4/0 822.80 129.25 1.00 822.80 121.75 1.00 7.50 NO 3.30
C37 Copper, commercial hard-drawn 4/0 1092.66 129.25 1.00 1092.66 121.75 1.00 7.50 NO 3.30
C38 Copper, commercial hard-drawn 4/0 1287.78 104.89 1.00 1287.78 121.75 1.00 16.86 NO 3.30
Project: CAASA LURIN ETAP Page: 3
DISEÑO ELÉCTRICO
Conductor Data
From To
Length Insulated Cost
Label Type AWG/kcmil X Y Z X Y Z ft Yes/No $/ft
C39 Copper, commercial hard-drawn 4/0 1058.59 147.79 1.00 1074.21 147.79 1.00 15.62 NO 3.30
C4 Copper, commercial hard-drawn 4/0 341.47 22.53 1.00 341.47 121.75 1.00 99.22 NO 3.30
C40 Copper, commercial hard-drawn 4/0 1074.21 147.79 1.00 1074.21 136.88 1.00 10.90 NO 3.30
C41 Copper, commercial hard-drawn 4/0 1027.71 129.25 1.00 1027.71 147.79 1.00 18.54 NO 3.30
C42 Copper, commercial hard-drawn 4/0 969.06 129.25 1.00 969.06 147.79 1.00 18.54 NO 3.30
C43 Copper, commercial hard-drawn 4/0 899.80 129.25 1.00 899.80 147.79 1.00 18.54 NO 3.30
C44 Copper, commercial hard-drawn 4/0 995.17 129.25 1.00 995.17 147.79 1.00 18.54 NO 3.30
C45 Copper, commercial hard-drawn 4/0 942.01 129.25 1.00 942.01 147.79 1.00 18.54 NO 3.30
C46 Copper, commercial hard-drawn 4/0 872.94 151.17 1.00 872.94 129.25 1.00 21.92 NO 3.30
C47 Copper, commercial hard-drawn 4/0 1092.66 129.25 1.00 1092.66 136.88 1.00 7.63 NO 3.30
C48 Copper, commercial hard-drawn 4/0 1092.66 136.88 1.00 1058.59 136.88 1.00 34.07 NO 3.30
C49 Copper, commercial hard-drawn 4/0 872.94 147.79 1.00 1058.59 147.79 1.00 185.65 NO 3.30
C5 Copper, commercial hard-drawn 4/0 439.89 22.52 1.00 439.89 121.75 1.00 99.23 NO 3.30
C50 Copper, commercial hard-drawn 4/0 872.94 151.17 1.00 822.80 151.17 1.00 50.14 NO 3.30
C51 Copper, commercial hard-drawn 4/0 822.80 129.25 1.00 1092.66 129.25 1.00 269.86 NO 3.30
C52 Copper, commercial hard-drawn 4/0 1056.47 16.41 1.00 1056.47 19.09 1.00 2.68 NO 3.30
C53 Copper, commercial hard-drawn 4/0 1056.47 19.09 1.00 1073.05 19.09 1.00 16.59 NO 3.30
C54 Copper, commercial hard-drawn 4/0 1073.05 19.09 1.00 1073.05 25.36 1.00 6.28 NO 3.30
C55 Copper, commercial hard-drawn 4/0 1073.05 25.36 1.00 1056.47 25.36 1.00 16.59 NO 3.30
C56 Copper, commercial hard-drawn 4/0 1056.47 25.36 1.00 1056.47 19.09 1.00 6.28 NO 3.30
C57 Copper, commercial hard-drawn 4/0 960.21 18.60 1.00 960.21 16.41 1.00 2.20 NO 3.30
C58 Copper, commercial hard-drawn 4/0 960.21 16.41 1.00 1056.47 16.41 1.00 96.26 NO 3.30
C59 Copper, commercial hard-drawn 4/0 948.36 18.60 1.00 948.36 16.44 1.00 2.16 NO 3.30
C6 Copper, commercial hard-drawn 4/0 538.32 22.52 1.00 538.32 121.75 1.00 99.23 NO 3.30
C60 Copper, commercial hard-drawn 4/0 948.36 16.44 1.00 907.92 16.44 1.00 40.44 NO 3.30
C61 Copper, commercial hard-drawn 4/0 907.92 16.44 1.00 907.92 19.14 1.00 2.71 NO 3.30
C62 Copper, commercial hard-drawn 4/0 909.36 19.14 1.00 909.36 25.50 1.00 6.36 NO 3.30
C63 Copper, commercial hard-drawn 4/0 884.43 19.14 1.00 909.36 19.14 1.00 24.93 NO 3.30
C64 Copper, commercial hard-drawn 4/0 909.36 25.50 1.00 884.43 25.50 1.00 24.93 NO 3.30
C65 Copper, commercial hard-drawn 4/0 884.43 25.50 1.00 884.43 19.14 1.00 6.36 NO 3.30
C66 Copper, commercial hard-drawn 4/0 947.16 18.60 1.00 961.63 18.60 1.00 14.47 NO 3.30
C67 Copper, commercial hard-drawn 4/0 961.63 18.60 1.00 961.63 25.57 1.00 6.97 NO 3.30
C68 Copper, commercial hard-drawn 4/0 961.63 25.57 1.00 947.16 25.57 1.00 14.47 NO 3.30
C69 Copper, commercial hard-drawn 4/0 947.16 25.57 1.00 947.16 18.60 1.00 6.97 NO 3.30
C7 Copper, commercial hard-drawn 4/0 636.74 22.52 1.00 636.74 121.75 1.00 99.23 NO 3.30
C70 Copper, commercial hard-drawn 4/0 727.10 76.30 1.00 727.10 75.25 1.00 1.05 NO 3.30
C71 Copper, commercial hard-drawn 4/0 1326.01 121.75 1.00 1326.01 22.50 1.00 99.25 NO 3.30
C72 Copper, commercial hard-drawn 4/0 828.46 27.91 1.00 742.77 27.91 1.00 85.69 NO 3.30
C73 Copper, commercial hard-drawn 4/0 742.77 27.91 1.00 710.41 27.91 1.00 32.36 NO 3.30
C74 Copper, commercial hard-drawn 4/0 710.41 27.91 1.00 710.41 35.59 1.00 7.69 NO 3.30
C75 Copper, commercial hard-drawn 4/0 710.41 53.41 1.00 710.41 75.25 1.00 21.84 NO 3.30
Project: CAASA LURIN ETAP Page: 4
DISEÑO ELÉCTRICO
Conductor Data
From To
Length Insulated Cost
Label Type AWG/kcmil X Y Z X Y Z ft Yes/No $/ft
C76 Copper, commercial hard-drawn 4/0 710.41 75.25 1.00 742.77 75.25 1.00 32.36 NO 3.30
C77 Copper, commercial hard-drawn 4/0 742.77 75.25 1.00 742.77 53.41 1.00 21.84 NO 3.30
C78 Copper, commercial hard-drawn 4/0 787.35 37.00 1.00 787.35 53.41 1.00 16.40 NO 3.30
C79 Copper, commercial hard-drawn 4/0 974.13 33.56 1.00 974.13 57.20 1.00 23.65 NO 3.30
C8 Copper, commercial hard-drawn 4/0 1245.79 115.26 1.00 1245.79 121.75 1.00 6.49 NO 3.30
C80 Copper, commercial hard-drawn 4/0 1287.78 75.85 1.00 1245.78 75.85 1.00 41.99 NO 3.30
C81 Copper, commercial hard-drawn 4/0 1287.78 104.89 1.00 1287.78 75.85 1.00 29.04 NO 3.30
C82 Copper, commercial hard-drawn 4/0 1245.78 104.89 1.00 1287.78 104.89 1.00 41.99 NO 3.30
C83 Copper, commercial hard-drawn 4/0 1245.78 75.85 1.00 1245.78 104.89 1.00 29.04 NO 3.30
C84 Copper, commercial hard-drawn 4/0 828.46 37.08 1.00 828.46 22.55 1.00 14.53 NO 3.30
C85 Copper, commercial hard-drawn 4/0 828.46 37.00 1.00 828.46 53.41 1.00 16.40 NO 3.30
C86 Copper, commercial hard-drawn 4/0 767.76 37.00 1.00 846.41 37.00 1.00 78.66 NO 3.30
C87 Copper, commercial hard-drawn 4/0 1066.30 33.56 1.00 1095.37 33.56 1.00 29.07 NO 3.30
C88 Copper, commercial hard-drawn 4/0 1095.37 49.96 1.00 1034.62 49.95 1.00 60.75 NO 3.30
C89 Copper, commercial hard-drawn 4/0 1095.37 33.56 1.00 1095.37 49.96 1.00 16.41 NO 3.30
C9 Copper, commercial hard-drawn 4/0 1245.57 33.56 1.00 1245.78 75.85 1.00 42.30 NO 3.30
C90 Copper, commercial hard-drawn 4/0 1034.62 33.56 1.00 1034.62 57.20 1.00 23.65 NO 3.30
C91 Copper, commercial hard-drawn 4/0 1002.37 57.20 1.00 1002.37 33.56 1.00 23.65 NO 3.30
C92 Copper, commercial hard-drawn 4/0 912.35 57.20 1.00 912.35 33.56 1.00 23.65 NO 3.30
C93 Copper, commercial hard-drawn 4/0 1066.30 33.56 1.00 1066.30 49.96 1.00 16.40 NO 3.30
C94 Copper, commercial hard-drawn 4/0 846.41 33.56 1.00 846.41 57.20 1.00 23.65 NO 3.30
C95 Copper, commercial hard-drawn 4/0 1034.62 57.20 1.00 846.41 57.20 1.00 188.21 NO 3.30
C96 Copper, commercial hard-drawn 4/0 710.41 53.41 1.00 846.41 53.41 1.00 136.00 NO 3.30
C97 Copper, commercial hard-drawn 4/0 710.41 35.59 1.00 710.41 53.41 1.00 17.82 NO 3.30
C98 Copper, commercial hard-drawn 4/0 742.77 35.60 1.00 710.41 35.59 1.00 32.36 NO 3.30
C99 Copper, commercial hard-drawn 4/0 767.76 37.00 1.00 742.77 37.00 1.00 24.98 NO 3.30
Rod Data
Diameter From To
Length Insulated Cost
Label Type inch X Y Z X Y Z ft Yes/No $/Rod
R1 Copper, commercial hard-drawn 1.900 636.74 22.52 1.00 636.74 22.52 3.40 2.40 NO 100.00
R10 Copper, commercial hard-drawn 1.900 872.94 129.25 1.00 872.94 129.25 3.40 2.40 NO 100.00
R11 Copper, commercial hard-drawn 1.900 1058.59 129.25 1.00 1058.59 129.25 3.40 2.40 NO 100.00
R12 Copper, commercial hard-drawn 1.900 1058.59 147.79 1.00 1058.59 147.79 3.40 2.40 NO 100.00
R13 Copper, commercial hard-drawn 1.900 942.01 129.25 1.00 942.01 129.25 3.40 2.40 NO 100.00
R14 Copper, commercial hard-drawn 1.900 995.17 147.79 1.00 995.17 147.79 3.40 2.40 NO 100.00
R15 Copper, commercial hard-drawn 1.900 995.17 129.25 1.00 995.17 129.25 3.40 2.40 NO 100.00
R16 Copper, commercial hard-drawn 1.900 1107.60 115.26 1.00 1107.60 115.26 3.40 2.40 NO 100.00
R17 Copper, commercial hard-drawn 1.900 1034.62 33.56 1.00 1034.62 33.56 3.40 2.40 NO 100.00
R18 Copper, commercial hard-drawn 1.900 974.13 33.56 1.00 974.13 33.56 3.40 2.40 NO 100.00
Project: CAASA LURIN ETAP Page: 5
DISEÑO ELÉCTRICO
Rod Data
Diameter From To
Length Insulated Cost
Label Type inch X Y Z X Y Z ft Yes/No $/Rod
R19 Copper, commercial hard-drawn 1.900 787.35 53.41 1.00 787.35 53.41 3.40 2.40 NO 100.00
R2 Copper, commercial hard-drawn 1.900 538.32 121.75 1.00 538.32 121.75 3.40 2.40 NO 100.00
R20 Copper, commercial hard-drawn 1.900 881.19 33.56 1.00 881.19 33.56 3.40 2.40 NO 100.00
R21 Copper, commercial hard-drawn 1.900 912.35 57.20 1.00 912.35 57.20 3.40 2.40 NO 100.00
R22 Copper, commercial hard-drawn 1.900 1060.09 93.94 1.00 1060.09 93.94 3.40 2.40 NO 100.00
R23 Copper, commercial hard-drawn 1.900 1014.15 111.65 1.00 1014.15 111.65 3.40 2.40 NO 100.00
R24 Copper, commercial hard-drawn 1.900 974.13 93.94 1.00 974.13 93.94 3.40 2.40 NO 100.00
R25 Copper, commercial hard-drawn 1.900 945.58 111.65 1.00 945.58 111.65 3.40 2.40 NO 100.00
R26 Copper, commercial hard-drawn 1.900 914.42 93.94 1.00 914.42 93.94 3.40 2.40 NO 100.00
R27 Copper, commercial hard-drawn 1.900 884.40 75.24 1.00 884.40 75.24 3.40 2.40 NO 100.00
R28 Copper, commercial hard-drawn 1.900 831.90 92.95 1.00 831.90 92.95 3.40 2.40 NO 100.00
R29 Copper, commercial hard-drawn 1.900 144.62 22.53 1.00 144.62 22.53 3.40 2.40 NO 100.00
R3 Copper, commercial hard-drawn 1.900 439.89 22.52 1.00 439.89 22.52 3.40 2.40 NO 100.00
R30 Copper, commercial hard-drawn 1.900 1287.76 75.85 1.00 1287.76 75.85 3.40 2.40 NO 100.00
R31 Copper, commercial hard-drawn 1.900 822.80 129.25 1.00 822.80 129.25 3.40 2.40 NO 100.00
R32 Copper, commercial hard-drawn 1.900 742.77 75.25 1.00 742.77 75.25 3.40 2.40 NO 100.00
R33 Copper, commercial hard-drawn 1.900 710.41 75.25 1.00 710.41 75.25 3.40 2.40 NO 100.00
R34 Copper, commercial hard-drawn 1.900 727.10 76.30 1.00 727.10 76.30 3.40 2.40 NO 100.00
R35 Copper, commercial hard-drawn 1.900 787.35 27.91 1.00 787.35 27.91 3.40 2.40 NO 100.00
R36 Copper, commercial hard-drawn 1.900 828.46 27.91 1.00 828.46 27.91 3.40 2.40 NO 100.00
R37 Copper, commercial hard-drawn 1.900 742.77 53.41 1.00 742.77 53.41 3.40 2.40 NO 100.00
R38 Copper, commercial hard-drawn 1.900 742.77 35.60 1.00 742.77 35.60 3.40 2.40 NO 100.00
R39 Copper, commercial hard-drawn 1.900 710.40 35.59 1.00 710.40 35.59 3.40 2.40 NO 100.00
R4 Copper, commercial hard-drawn 1.900 341.47 121.75 1.00 341.47 121.75 3.40 2.40 NO 100.00
R40 Copper, commercial hard-drawn 1.900 710.41 53.41 1.00 710.41 53.41 3.40 2.40 NO 100.00
R41 Copper, commercial hard-drawn 1.900 1040.31 22.49 1.00 1040.31 22.49 3.40 2.40 NO 100.00
R42 Copper, commercial hard-drawn 1.900 1111.79 121.75 1.00 1111.79 121.75 3.40 2.40 NO 100.00
R43 Copper, commercial hard-drawn 1.900 1326.01 121.75 1.00 1326.01 121.75 3.40 2.40 NO 100.00
R5 Copper, commercial hard-drawn 1.900 243.04 22.54 1.00 243.04 22.54 3.40 2.40 NO 100.00
R6 Copper, commercial hard-drawn 1.900 787.35 92.95 1.00 787.35 92.95 3.40 2.40 NO 100.00
R7 Copper, commercial hard-drawn 1.900 1245.79 75.85 1.00 1245.79 75.85 3.40 2.40 NO 100.00
R8 Copper, commercial hard-drawn 1.900 772.65 151.17 1.00 772.65 151.17 3.40 2.40 NO 100.00
R9 Copper, commercial hard-drawn 1.900 58.51 121.75 1.00 58.51 121.75 3.40 2.40 NO 100.00
Cost
Conductor Rod
Total Total Length Cost Total Total Length Cost Total Cost
No. ft $ No. ft $ $
123 8175 26978.17 43 103 4300.00 31278.17