SON: SIETE MILLONES SESENTA Y OCHO MIL OCHOCIENTOS TREINTA Y SIETE Y 18/100 SOLES
INCLUYE: GASTOS GENERALES Y UTILIDAD
PARCIAL
127,631.78
34,500.00
25000.00
9500.00
93,131.78
10,905.30
37,389.60
26,795.88
4,430.00
3,495.00
10,116.00
4,624,979.83
39,180.94
38,174.13
0.00
156.48
174.76
150.88
524.69
170,357.95
118,916.23
50,646.70
571.22
223.79
4,111,033.80
77,353.27
21,342.65
10,034.02
343,130.47
139,561.27
1,747.86
27,234.23
24,229.77
6,076.58
3,097.53
101,426.34
35,279.24
436.83
8,669.01
116,029.90
21,747.75
8,402.88
158,500.15
46,269.51
494.18
46,664.78
264,593.68
57,333.04
25,604.06
634,688.23
213,130.79
2,631.71
29,358.22
197,137.08
45,776.88
16,212.61
453,668.00
162,946.94
1,581.71
43,832.79
217,464.95
78,688.27
773.43
20,988.14
110,492.31
336,402.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,982.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARCIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
87.04
156.41
96.76
1,641.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARCIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
96,644.10
148.92
8.09
67.49
46.65
26,308.88
2,872.31
0.00
0.00
2,450.51
514.98
22.42
240.39
46.65
26,577.62
2,986.00
0.00
0.00
2,450.51
37.23
2.02
16.87
11.62
6,577.22
718.08
0.00
0.00
612.63
111.69
6.07
PARCIAL
50.62
34.87
19,731.66
2,154.23
0.00
0.00
1,837.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24,688.58
223.38
12.14
101.23
72.60
13,154.44
1,436.15
0.00
0.00
1,225.25
0.00
109.53
20.04
187.30
34.87
6,644.40
746.50
0.00
0.00
720.74
181,092.40
49,806.60
1,195.73
21,413.92
5,927.71
14,956.07
10,527.42
2,576.63
1,358.77
849.76
2,359.99
27,166.92
7,767.35
16,995.54
12,350.61
3,173.19
1,618.96
1,047.24
1,244,348.45
33,020.55
10,742.67
2,937.50
7,469.19
8,215.22
706.80
142.62
996.41
928.57
156.48
174.76
100.59
449.73
70,059.42
45,221.33
24,571.24
153.72
113.12
1,075,490.75
20,646.55
14,951.69
931.70
86,896.78
37,179.11
6,467.23
4,256.98
287.62
25,685.92
PARCIAL
9,398.39
30,969.82
15,235.49
780.24
40,139.69
12,326.19
70,623.34
40,164.93
2,377.43
160,732.92
56,778.02
52,618.33
32,069.21
1,505.40
114,890.08
43,409.05
55,072.36
20,962.54
36,320.79
81,812.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,053.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
633.45
381.24
38.70
0.00
0.00
0.00
13,860.24
1,063.94
3,423.65
693.98
2,873.56
1,759.67
2,707.02
1,338.43
50,864.09
14,018.20
5,172.15
1,242.75
4,704.34
PARCIAL
3,123.46
2,203.81
217.24
6,561.68
1,628.43
5,345.84
3,664.40
2,714.06
267.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARCIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARCIAL
PARCIAL
PARCIAL
PARCIAL
PARCIAL
PARCIAL
5,996,960.06
01.02.09 CONEXIO 3,783,881.37
NES DE
AGUA
POTABLE
son: DIEZ MILLONES CIENTO CINCUENTA Y SIETE MIL NOVECIENTOS TREINTA Y 02/100 SOLES.
(Incluye: GASTOS GENERALES Y UTILIDAD)
PLANILLA DE SUSTENTACION DE METRADOS
PLANILLA DE METRADOS - OBRAS LINEALES
PROYECTO “AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE TOCACHE - DISTRITO DE TOCACHE - PROVINCIA DE TOCACHE - DEPARTAMENTO DE SAN MARTIN¨
CLIENTE : MUNICIPALIDAD PROVINCIAL TOCACHE ESPECIALIDAD : OBRAS CIVILES
UBICACIÓN : TOCACHE-TOCACHE-SAN MARTIN HECHO POR : WIMOESC
FECHA : SEPTIEMBRE 2019
N° MEDIDAS
ITEM PARTIDAS UND PARCIAL TOTAL
VECES LARGO ANCHO ALTO
02.01 OBRAS LINEALES
02.01.01 TRABAJOS COMPLEMENTARIOS
02.01.01.01 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACIÓN - POLVO (INCL. COSTO DE AGUA Y TRANSPORTE SURTIDOR A OBRA) m 1.00 #REF! #REF! #REF!
02.01.01.02 CERCO DE MALLA HDP DE 1 M ALTURA PARA LÍMITE DE SEGURIDAD DE OBRA m 2.00 #REF! #REF! #REF!
02.01.01.03 CINTA PLÁSTICA SEÑALIZADORA PARA LÍMITE DE SEGURIDAD DE OBRA m 2.00 #REF! #REF! #REF!
02.01.01.04 TRANQUERA TIPO CABALLETE DE 2,40 X 1,20M P/SEÑALALIZ-PROTEC.(PROV. DURANTE OBRA) und #REF! #REF! #REF!
02.01.01.05 PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROV. DURANTE OBRA) und #REF! #REF! #REF!
02.01.01.06 PUENTE DE MADERA PARA PASE VEHICULAR SOBRE ZANJA S/D (PROV. DURANTE OBRA) und #REF! #REF! #REF!
02.01.02.06 VALVULAS
02.01.02.06.01 VALVULAS DE AIRE DN 100 EN LINEA DN 315
02.01.02.06.01.01 CÁMARA TIPO CIRCULAR DI=1,50 M P/VÁLVULA AIRE T. NORMAL SATURADO 2,51 - 3,00 M PROF. (C-PV) und #REF! #REF! #REF!
Altura 1.915
Excavaciones terreno normal saturado a pulso hasta 3,00 m profundidad. m3 diámetro 19.43
1.00 3.10 2.52 18.98
Sumidero 1.00 0.70 0.30 0.12
Tubería de ventilación 1.00 1.00 0.500 0.67 0.34
Refine, nivelacion y compactacion en terreno normal saturado a pulso m2 8.05
1.00 3.10 7.55
1.00 1.00 0.500 0.50
Relleno compactado con material de préstamo en terrreno normal saturado a pulso m3 12.01
1.00 1.20 0.270 0.50 0.16
diámetro área
1.00 3.10 7.548 2.52 11.85
1.00 1.90 2.835
Eliminacion de desmonte en terreno normal saturado D= 10km (incluye pago por disposicion fginal a centro autorizado) m3 1.00 19.43 19.43
Concreto f´c 100 kg/cm2 para solados de buzones, cámaras, cajas (Cemento P-V) m3 1.00 3.10 0.10 0.75
Concreto f´c 175 kg/cm2 para anclajes y/o dados (Cemento P-V) m3 1.00 0.52 0.240 0.59 0.07
perimetro
Encofrado (incl. Habilitacion de madera) para anclajes y/o dados m2 1.00 1.52 0.59 0.90
diámetro
Concreto f´c 280 kg/cm2 p/losa fondo-base de buzones, cámaras, cajas (CementoP-V) m3 1.00 3.10 0.20 1.51
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.15
1.00 1.90 1.500 1.92 2.05
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 21.83
diámetro
1.00 1.90 1.92 11.43
1.00 1.50 1.92 9.02
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
1/2" 1.00 1.00 1.300 1.02 1.33
1/2" 1.00 2.00 0.370 1.02 0.75
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.720 1.02 1.47
1/2" 1.00 2.00 0.810 1.02 1.65
1/2" 1.00 2.00 0.870 1.02 1.77
1/2" 1.00 2.00 0.920 1.02 1.88
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.950 1.02 1.94
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.690 1.02 1.41
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.510 1.02 1.04
1/2" 1.00 2.00 0.470 1.02 0.96
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.370 1.02 0.75
Refuerzo sup. e inf. 1/2" 2.00 1.00 1.200 1.02 2.45
1/2" 2.00 2.00 1.090 1.02 4.45
1/2" 2.00 1.00 0.790 1.02 1.61
02.01.02.06.01.02 VÁLVULA DE AIRE BRIDADA PARA ADESAGUE DN 100 und #REF! #REF! #REF!
02.01.02.06.01.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE AIRE DN 100 EN LINEA DN 315 und #REF! #REF! #REF!
Tee HD BBB DN 315 x 100 mm und 1.00 1.00
Transicion Luflex Brida campana DN 300 HD und 2.00 2.00
Válvula de aislamiento de bronce und 1.00 1.00
Valvula de cierre de bronce und 1.00 1.00
Valvula para suministro de agua und 1.00 1.00
Brida de acero para soldar y empernar DN 300 und 4.00 4.00
Brida de acero para soldar anclaje DN 300 und 2.00 2.00
Empaquetadura de jebe enlonada DN 300 und 4.00 4.00
Empaquetadura de jebe enlonada DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 300 und 48.00 48.00
Perno incluye tuerca p/brida DN 100 und 8.00 8.00
Manometro incl. Accesorios und 1.00 1.00
02.01.02.06.01.04 MONTAJE DE VÁLVULA DE AIRE DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.36
1.00 1.90 1.500 2.12 2.26
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 23.97
diámetro
1.00 1.90 2.12 12.62
1.00 1.50 2.12 9.97
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
1/2" 1.00 1.00 1.300 1.02 1.33
1/2" 1.00 2.00 0.370 1.02 0.75
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.720 1.02 1.47
1/2" 1.00 2.00 0.810 1.02 1.65
1/2" 1.00 2.00 0.870 1.02 1.77
1/2" 1.00 2.00 0.920 1.02 1.88
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.950 1.02 1.94
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.690 1.02 1.41
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.510 1.02 1.04
1/2" 1.00 2.00 0.470 1.02 0.96
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.370 1.02 0.75
Refuerzo sup. e inf. 1/2" 2.00 1.00 1.200 1.02 2.45
1/2" 2.00 2.00 1.090 1.02 4.45
1/2" 2.00 1.00 0.790 1.02 1.61
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
02.01.02.06.02.02 VÁLVULA DE PURGA DN 100 COMPUERTA TIPO BRIDADA DE HIERRO DUCTIL C/ELASTÓMERO und #REF! #REF! #REF!
02.01.02.06.02.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE PURGA DN 100 EN LINEA DN 315 und #REF! #REF! #REF!
Tee mixta Brida - Luflex - HD BB DN 315 - 100 mm und 1.00 1.00
Codo ho. Ductil 45° (1/8) 2 bridas DN 100 und 1.00 1.00
Codo ho. Ductil 90° (1/4) 2 bridas DN 100 und 1.00 1.00
Union flexible tipo Dresser DN 100 und 1.00 1.00
Empaquetadura de jebe enlonada DN 100 und 6.00 6.00
Brida de acero para soldar y empernar DN 100 und 5.00 5.00
Brida de acero para soldar anclaje DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 100 mm und 48.00 48.00
Tuberia de acero SCH-40 DN 100 m 1.00 1.30 1.30
Tuberia de acero con un extremo roscado DN 100 m 1.00 1.40 1.40
02.01.02.06.02.04 MONTAJE DE VÁLVULA DE PURGA DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
02.01.02.07 PRUEBAS
02.01.02.07.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und #REF! #REF! #REF!
02.01.02.07.02 PRUEBA HIDRÁULICA DE TUBERÍA AGUA POTABLE (INCL. DESINFECCIÓN) DN 315 m 1.00 #REF! #REF! #REF!
02.01.03.06 VALVULAS
02.01.03.06.01 VALVULAS DE AIRE DN 100 EN LINEA DN 160
02.01.03.06.01.01 CÁMARA TIPO CIRCULAR DI=1,50 M P/VÁLVULA AIRE T. NORMAL SATURADO 2,51 - 3,00 M PROF. (C-PV) und #REF! #REF! #REF!
Altura 1.915
Excavaciones terreno normal saturado a pulso hasta 3,00 m profundidad. m3 diámetro 19.43
1.00 3.10 2.52 18.98
Sumidero 1.00 0.70 0.30 0.12
Tubería de ventilación 1.00 1.00 0.500 0.67 0.34
Refine, nivelacion y compactacion en terreno normal saturado a pulso m2 8.05
1.00 3.10 7.55
1.00 1.00 0.500 0.50
Relleno compactado con material de préstamo en terrreno normal saturado a pulso m3 12.01
1.00 1.20 0.270 0.50 0.16
diámetro área
1.00 3.10 7.548 2.52 11.85
1.00 1.90 2.835
Eliminacion de desmonte en terreno normal saturado D= 10km (incluye pago por disposicion fginal a centro autorizado) m3 1.00 19.43 19.43
Concreto f´c 100 kg/cm2 para solados de buzones, cámaras, cajas (Cemento P-V) m3 1.00 3.10 0.10 0.75
Concreto f´c 175 kg/cm2 para anclajes y/o dados (Cemento P-V) m3 1.00 0.52 0.240 0.59 0.07
perimetro
Encofrado (incl. Habilitacion de madera) para anclajes y/o dados m2 1.00 1.52 0.59 0.90
diámetro
Concreto f´c 280 kg/cm2 p/losa fondo-base de buzones, cámaras, cajas (CementoP-V) m3 1.00 3.10 0.20 1.51
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.15
1.00 1.90 1.500 1.92 2.05
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 21.83
diámetro
1.00 1.90 1.92 11.43
1.00 1.50 1.92 9.02
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
Rejilla metálica removible p/salida de tuberia de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.03.06.01.02 VÁLVULA DE AIRE BRIDADA PARA ADESAGUE DN 100 und #REF! #REF! #REF!
02.01.03.06.01.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE AIRE DN 100 EN LINEA DN 160 und #REF! #REF! #REF!
Tee HD BBB DN 150 x 100 mm und 1.00 1.00
Transicion Luflex Brida campana DN 150 HD und 2.00 2.00
Válvula de aislamiento de bronce und 1.00 1.00
Valvula de cierre de bronce und 1.00 1.00
Valvula para suministro de agua und 1.00 1.00
Brida de acero para soldar y empernar DN 150 und 4.00 4.00
Brida de acero para soldar anclaje DN 150 und 2.00 2.00
Empaquetadura de jebe enlonada DN 150 und 4.00 4.00
Empaquetadura de jebe enlonada DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 150 und 32.00 32.00
Perno incluye tuerca p/brida DN 100 und 8.00 8.00
Manometro incl. Accesorios und 1.00 1.00
02.01.03.06.01.04 MONTAJE DE VÁLVULA DE AIRE DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.36
1.00 1.90 1.500 2.12 2.26
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 23.97
diámetro
1.00 1.90 2.12 12.62
1.00 1.50 2.12 9.97
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
1/2" 1.00 1.00 1.300 1.02 1.33
1/2" 1.00 2.00 0.370 1.02 0.75
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.720 1.02 1.47
1/2" 1.00 2.00 0.810 1.02 1.65
1/2" 1.00 2.00 0.870 1.02 1.77
1/2" 1.00 2.00 0.920 1.02 1.88
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.950 1.02 1.94
1/2" 1.00 2.00 0.940 1.02 1.92
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.03.06.02.02 VÁLVULA DE PURGA DN 100 COMPUERTA TIPO BRIDADA DE HIERRO DUCTIL C/ELASTÓMERO und #REF! #REF! #REF!
02.01.03.06.02.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE PURGA DN 100 EN LINEA DN 160 und #REF! #REF! #REF!
Tee mixta Brida - Luflex - HD BB DN 160 - 100 mm und 1.00 1.00
Codo ho. Ductil 45° (1/8) 2 bridas DN 100 und 1.00 1.00
Codo ho. Ductil 90° (1/4) 2 bridas DN 100 und 1.00 1.00
Union flexible tipo Dresser DN 100 und 1.00 1.00
Empaquetadura de jebe enlonada DN 100 und 6.00 6.00
Brida de acero para soldar y empernar DN 100 und 5.00 5.00
Brida de acero para soldar anclaje DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 100 mm und 48.00 48.00
Tuberia de acero SCH-40 DN 100 m 1.00 1.30 1.30
Tuberia de acero con un extremo roscado DN 100 m 1.00 1.40 1.40
02.01.03.06.02.04 MONTAJE DE VÁLVULA DE PURGA DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
02.01.03.07 PRUEBAS
02.01.03.07.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und #REF! #REF! #REF!
02.01.03.07.02 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 160MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.03.07.03 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 160MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.04.06 VALVULAS
02.01.04.06.01 VALVULAS DE AIRE DN 100 EN LINEA DN 160
02.01.04.06.01.01 CÁMARA TIPO CIRCULAR DI=1,50 M P/VÁLVULA AIRE T. NORMAL SATURADO 2,51 - 3,00 M PROF. (C-PV) und #REF! #REF! #REF!
Altura 1.915
Excavaciones terreno normal saturado a pulso hasta 3,00 m profundidad. m3 diámetro 19.43
1.00 3.10 2.52 18.98
Sumidero 1.00 0.70 0.30 0.12
Tubería de ventilación 1.00 1.00 0.500 0.67 0.34
Refine, nivelacion y compactacion en terreno normal saturado a pulso m2 8.05
1.00 3.10 7.55
1.00 1.00 0.500 0.50
Relleno compactado con material de préstamo en terrreno normal saturado a pulso m3 12.01
1.00 1.20 0.270 0.50 0.16
diámetro área
1.00 3.10 7.548 2.52 11.85
1.00 1.90 2.835
Eliminacion de desmonte en terreno normal saturado D= 10km (incluye pago por disposicion fginal a centro autorizado) m3 1.00 19.43 19.43
Concreto f´c 100 kg/cm2 para solados de buzones, cámaras, cajas (Cemento P-V) m3 1.00 3.10 0.10 0.75
Concreto f´c 175 kg/cm2 para anclajes y/o dados (Cemento P-V) m3 1.00 0.52 0.240 0.59 0.07
perimetro
Encofrado (incl. Habilitacion de madera) para anclajes y/o dados m2 1.00 1.52 0.59 0.90
diámetro
Concreto f´c 280 kg/cm2 p/losa fondo-base de buzones, cámaras, cajas (CementoP-V) m3 1.00 3.10 0.20 1.51
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.15
1.00 1.90 1.500 1.92 2.05
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 21.83
diámetro
1.00 1.90 1.92 11.43
1.00 1.50 1.92 9.02
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
Rejilla metálica removible p/salida de tuberia de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.04.06.01.02 VÁLVULA DE AIRE BRIDADA PARA ADESAGUE DN 100 und #REF! #REF! #REF!
02.01.04.06.01.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE AIRE DN 100 EN LINEA DN 160 und #REF! #REF! #REF!
Tee HD BBB DN 150 x 100 mm und 1.00 1.00
Transicion Luflex Brida campana DN 150 HD und 2.00 2.00
Válvula de aislamiento de bronce und 1.00 1.00
Valvula de cierre de bronce und 1.00 1.00
Valvula para suministro de agua und 1.00 1.00
Brida de acero para soldar y empernar DN 200 und 4.00 4.00
Brida de acero para soldar anclaje DN 200 und 2.00 2.00
Empaquetadura de jebe enlonada DN 200 und 4.00 4.00
Empaquetadura de jebe enlonada DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 200 und 32.00 32.00
Perno incluye tuerca p/brida DN 100 und 8.00 8.00
Manometro incl. Accesorios und 1.00 1.00
02.01.04.06.01.04 MONTAJE DE VÁLVULA DE AIRE DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.36
1.00 1.90 1.500 2.12 2.26
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 23.97
diámetro
1.00 1.90 2.12 12.62
1.00 1.50 2.12 9.97
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.04.06.02.02 VÁLVULA DE PURGA DN 100 COMPUERTA TIPO BRIDADA DE HIERRO DUCTIL C/ELASTÓMERO und #REF! #REF! #REF!
02.01.04.06.02.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE PURGA DN 100 EN LINEA DN 160 und #REF! #REF! #REF!
Tee mixta Brida - Luflex - HD BB DN 150 - 100 mm und 1.00 1.00
Codo ho. Ductil 45° (1/8) 2 bridas DN 100 und 1.00 1.00
Codo ho. Ductil 90° (1/4) 2 bridas DN 100 und 1.00 1.00
Union flexible tipo Dresser DN 100 und 1.00 1.00
Empaquetadura de jebe enlonada DN 100 und 6.00 6.00
Brida de acero para soldar y empernar DN 100 und 5.00 5.00
Brida de acero para soldar anclaje DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 100 mm und 48.00 48.00
Tuberia de acero SCH-40 DN 100 m 1.00 1.30 1.30
Tuberia de acero con un extremo roscado DN 100 m 1.00 1.40 1.40
02.01.04.06.02.04 MONTAJE DE VÁLVULA DE PURGA DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
02.01.04.07 PRUEBAS
02.01.04.07.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und #REF! #REF! #REF!
02.01.04.07.02 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 160MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.04.07.03 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 160MM A ZANJA TAPADA m 1.00 #REF! #REF!
02.01.05.05 VALVULAS
02.01.05.05.01 VALVULAS DE AIRE DN 100 EN LINEA DN 110
02.01.05.05.01.01 CÁMARA TIPO CIRCULAR DI=1,50 M P/VÁLVULA AIRE T. NORMAL SATURADO 2,51 - 3,00 M PROF. (C-PV) und #REF! #REF! #REF!
Altura 1.915
Excavaciones terreno normal saturado a pulso hasta 3,00 m profundidad. m3 diámetro 19.43
1.00 3.10 2.52 18.98
Sumidero 1.00 0.70 0.30 0.12
Tubería de ventilación 1.00 1.00 0.500 0.67 0.34
Refine, nivelacion y compactacion en terreno normal saturado a pulso m2 8.05
1.00 3.10 7.55
1.00 1.00 0.500 0.50
Relleno compactado con material de préstamo en terrreno normal saturado a pulso m3 12.01
1.00 1.20 0.270 0.50 0.16
diámetro área
1.00 3.10 7.548 2.52 11.85
1.00 1.90 2.835
Eliminacion de desmonte en terreno normal saturado D= 10km (incluye pago por disposicion fginal a centro autorizado) m3 1.00 19.43 19.43
Concreto f´c 100 kg/cm2 para solados de buzones, cámaras, cajas (Cemento P-V) m3 1.00 3.10 0.10 0.75
Concreto f´c 175 kg/cm2 para anclajes y/o dados (Cemento P-V) m3 1.00 0.52 0.240 0.59 0.07
perimetro
Encofrado (incl. Habilitacion de madera) para anclajes y/o dados m2 1.00 1.52 0.59 0.90
diámetro
Concreto f´c 280 kg/cm2 p/losa fondo-base de buzones, cámaras, cajas (CementoP-V) m3 1.00 3.10 0.20 1.51
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.15
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
Rejilla metálica removible p/salida de tuberia de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.05.05.01.02 VÁLVULA DE AIRE BRIDADA PARA DESAGUE DN 100 und #REF! #REF! #REF!
02.01.05.05.01.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE AIRE DN 100 EN LINEA DN 110 und #REF! #REF! #REF!
Tee HD BBB DN 100 x 100 mm und 1.00 1.00
Transicion Luflex Brida campana DN 100 HD und 2.00 2.00
Válvula de aislamiento de bronce und 1.00 1.00
Valvula de cierre de bronce und 1.00 1.00
Valvula para suministro de agua und 1.00 1.00
Brida de acero para soldar y empernar DN 100 und 4.00 4.00
Brida de acero para soldar anclaje DN 100 und 2.00 2.00
Empaquetadura de jebe enlonada DN 100 und 5.00 5.00
Perno incluye tuerca p/brida DN 100 und 40.00 40.00
Manometro incl. Accesorios und 1.00 1.00
02.01.05.05.01.04 MONTAJE DE VÁLVULA DE AIRE DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.36
1.00 1.90 1.500 2.12 2.26
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 23.97
diámetro
1.00 1.90 2.12 12.62
1.00 1.50 2.12 9.97
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.05.05.02.02 VÁLVULA DE PURGA DN 100 COMPUERTA TIPO BRIDADA DE HIERRO DUCTIL C/ELASTÓMERO und #REF! #REF! #REF!
02.01.05.05.02.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE PURGA DN 100 EN LINEA DN 110 und #REF! #REF! #REF!
Tee mixta Brida - Luflex - HD BB DN 160 - 100 mm und 1.00 1.00
Codo ho. Ductil 45° (1/8) 2 bridas DN 100 und 1.00 1.00
Codo ho. Ductil 90° (1/4) 2 bridas DN 100 und 1.00 1.00
Union flexible tipo Dresser DN 100 und 1.00 1.00
Empaquetadura de jebe enlonada DN 100 und 6.00 6.00
Brida de acero para soldar y empernar DN 100 und 5.00 5.00
Brida de acero para soldar anclaje DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 100 mm und 48.00 48.00
Tuberia de acero SCH-40 DN 100 m 1.00 1.30 1.30
Tuberia de acero con un extremo roscado DN 100 m 1.00 1.40 1.40
02.01.05.05.02.04 MONTAJE DE VÁLVULA DE PURGA DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
02.01.05.06 PRUEBAS
02.01.05.06.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und #REF! #REF! #REF!
02.01.05.06.02 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 110MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.05.06.03 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 110MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.06.05 VALVULAS
02.01.06.05.01 VALVULAS DE AIRE DN 100 EN LINEA DN 160
02.01.06.05.01.01 CÁMARA TIPO CIRCULAR DI=1,50 M P/VÁLVULA AIRE T. NORMAL SATURADO 2,51 - 3,00 M PROF. (C-PV) und #REF! #REF! #REF!
Altura 1.915
Excavaciones terreno normal saturado a pulso hasta 3,00 m profundidad. m3 diámetro 19.43
1.00 3.10 2.52 18.98
Ssumidero 1.00 0.70 0.30 0.12
Tubería de ventilación 1.00 1.00 0.500 0.67 0.34
Refine, nivelacion y compactacion en terreno normal saturado a pulso m2 8.05
1.00 3.10 7.55
1.00 1.00 0.500 0.50
Relleno compactado con material de préstamo en terrreno normal saturado a pulso m3 12.01
1.00 1.20 0.270 0.50 0.16
diámetro área
1.00 3.10 7.548 2.52 11.85
1.00 1.90 2.835
Eliminacion de desmonte en terreno normal saturado D= 10km (incluye pago por disposicion fginal a centro autorizado) m3 1.00 19.43 19.43
Concreto f´c 100 kg/cm2 para solados de buzones, cámaras, cajas (Cemento P-V) m3 1.00 3.10 0.10 0.75
Concreto f´c 175 kg/cm2 para anclajes y/o dados (Cemento P-V) m3 1.00 0.52 0.240 0.59 0.07
perimetro
Encofrado (incl. Habilitacion de madera) para anclajes y/o dados m2 1.00 1.52 0.59 0.90
diámetro
Concreto f´c 280 kg/cm2 p/losa fondo-base de buzones, cámaras, cajas (CementoP-V) m3 1.00 3.10 0.20 1.51
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.15
1.00 1.90 1.500 1.92 2.05
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 21.83
diámetro
1.00 1.90 1.92 11.43
1.00 1.50 1.92 9.02
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
1/2" 1.00 1.00 1.300 1.02 1.33
1/2" 1.00 2.00 0.370 1.02 0.75
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.720 1.02 1.47
1/2" 1.00 2.00 0.810 1.02 1.65
1/2" 1.00 2.00 0.870 1.02 1.77
1/2" 1.00 2.00 0.920 1.02 1.88
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.950 1.02 1.94
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.690 1.02 1.41
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.510 1.02 1.04
1/2" 1.00 2.00 0.470 1.02 0.96
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.370 1.02 0.75
Refuerzo sup. e inf. 1/2" 2.00 1.00 1.200 1.02 2.45
1/2" 2.00 2.00 1.090 1.02 4.45
1/2" 2.00 1.00 0.790 1.02 1.61
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
Rejilla metálica removible p/salida de tuberia de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.06.05.01.02 VÁLVULA DE AIRE BRIDADA PARA ADESAGUE DN 100 und #REF! #REF! #REF!
02.01.06.05.01.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE AIRE DN 100 EN LINEA DN 160 und #REF! #REF! #REF!
Tee HD BBB DN 150 x 100 mm und 1.00 1.00
Transicion Luflex Brida campana DN 150 HD und 2.00 2.00
Válvula de aislamiento de bronce und 1.00 1.00
Valvula de cierre de bronce und 1.00 1.00
Valvula para suministro de agua und 1.00 1.00
Brida de acero para soldar y empernar DN 150 und 4.00 4.00
Brida de acero para soldar anclaje DN 150 und 2.00 2.00
Empaquetadura de jebe enlonada DN 150 und 4.00 4.00
Empaquetadura de jebe enlonada DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 150 und 32.00 32.00
Perno incluye tuerca p/brida DN 100 und 8.00 8.00
manometro incl. Accesorios und 1.00 1.00
02.01.06.05.01.04 MONTAJE DE VÁLVULA DE AIRE DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.36
1.00 1.90 1.500 2.12 2.26
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.06.05.02.02 VÁLVULA DE PURGA DN 100 COMPUERTA TIPO BRIDADA DE HIERRO DUCTIL C/ELASTÓMERO und #REF! #REF! #REF!
02.01.06.05.02.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE PURGA DN 100 EN LINEA DN 160 und #REF! #REF! #REF!
Tee mixta Brida - Luflex - HD BB DN 160 - 100 mm und 1.00 1.00
Codo ho. Ductil 45° (1/8) 2 bridas DN 100 und 1.00 1.00
Codo ho. Ductil 90° (1/4) 2 bridas DN 100 und 1.00 1.00
Union flexible tipo Dresser DN 100 und 1.00 1.00
Empaquetadura de jebe enlonada DN 100 und 6.00 6.00
Brida de acero para soldar y empernar DN 100 und 5.00 5.00
Brida de acero para soldar anclaje DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 100 mm und 48.00 48.00
Tuberia de acero SCH-40 DN 100 m 1.00 1.30 1.30
Tuberia de acero con un extremo roscado DN 100 m 1.00 1.40 1.40
02.01.06.05.02.04 MONTAJE DE VÁLVULA DE PURGA DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
02.01.06.06 PRUEBAS
02.01.06.06.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und #REF! #REF! #REF!
02.01.06.06.02 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 160MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.06.06.03 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 160MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.07.05 VALVULAS
02.01.07.05.01 VALVULAS DE AIRE DN 100 EN LINEA DN 110
02.01.07.05.01.01 CÁMARA TIPO CIRCULAR DI=1,50 M P/VÁLVULA AIRE T. NORMAL 2,51 - 3,00 M PROF. (C-PV) und #REF! #REF! #REF!
Altura 1.915
Excavaciones terreno normal a pulso hasta 3,00 m profundidad. m3 diámetro 19.43
1.00 3.10 2.52 18.98
Sumidero 1.00 0.70 0.30 0.12
Tubería de ventilación 1.00 1.00 0.500 0.67 0.34
Refine, nivelacion y compactacion en terreno normal a pulso m2 8.05
1.00 3.10 7.55
1.00 1.00 0.500 0.50
Relleno compactado con material de préstamo en terrreno normal a pulso m3 12.01
1.00 1.20 0.270 0.50 0.16
diámetro área
1.00 3.10 7.548 2.52 11.85
1.00 1.90 2.835
Eliminacion de desmonte en terreno normal D= 10km (incluye pago por disposicion fginal a centro autorizado) m3 1.00 19.43 19.43
Concreto f´c 100 kg/cm2 para solados de buzones, cámaras, cajas (Cemento P-V) m3 1.00 3.10 0.10 0.75
Concreto f´c 175 kg/cm2 para anclajes y/o dados (Cemento P-V) m3 1.00 0.52 0.240 0.59 0.07
perimetro
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.15
1.00 1.90 1.500 1.92 2.05
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 21.83
diámetro
1.00 1.90 1.92 11.43
1.00 1.50 1.92 9.02
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
1/2" 1.00 1.00 1.300 1.02 1.33
1/2" 1.00 2.00 0.370 1.02 0.75
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.720 1.02 1.47
1/2" 1.00 2.00 0.810 1.02 1.65
1/2" 1.00 2.00 0.870 1.02 1.77
1/2" 1.00 2.00 0.920 1.02 1.88
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.950 1.02 1.94
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.690 1.02 1.41
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.510 1.02 1.04
1/2" 1.00 2.00 0.470 1.02 0.96
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.370 1.02 0.75
Refuerzo sup. e inf. 1/2" 2.00 1.00 1.200 1.02 2.45
1/2" 2.00 2.00 1.090 1.02 4.45
1/2" 2.00 1.00 0.790 1.02 1.61
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
Rejilla metálica removible p/salida de tuberia de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.07.05.01.02 VÁLVULA DE AIRE BRIDADA PARA ADESAGUE DN 110 und #REF! #REF! #REF!
02.01.07.05.01.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE AIRE DN 100 EN LINEA DN 110 und #REF! #REF! #REF!
Tee HD BBB DN 100 x 100 mm und 1.00 1.00
Transicion Luflex Brida campana DN 100 HD und 2.00 2.00
Válvula de aislamiento de bronce und 1.00 1.00
Valvula de cierre de bronce und 1.00 1.00
Valvula para suministro de agua und 1.00 1.00
Brida de acero para soldar y empernar DN 100 und 4.00 4.00
Brida de acero para soldar anclaje DN 100 und 2.00 2.00
Empaquetadura de jebe enlonada DN 100 und 5.00 5.00
Perno incluye tuerca p/brida DN 100 und 40.00 40.00
Manometro incl. Accesorios und 1.00 1.00
02.01.07.05.01.04 MONTAJE DE VÁLVULA DE AIRE DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.36
1.00 1.90 1.500 2.12 2.26
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 23.97
diámetro
1.00 1.90 2.12 12.62
1.00 1.50 2.12 9.97
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
1/2" 1.00 1.00 1.300 1.02 1.33
1/2" 1.00 2.00 0.370 1.02 0.75
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.720 1.02 1.47
1/2" 1.00 2.00 0.810 1.02 1.65
1/2" 1.00 2.00 0.870 1.02 1.77
1/2" 1.00 2.00 0.920 1.02 1.88
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.950 1.02 1.94
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.690 1.02 1.41
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.510 1.02 1.04
1/2" 1.00 2.00 0.470 1.02 0.96
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.370 1.02 0.75
Refuerzo sup. e inf. 1/2" 2.00 1.00 1.200 1.02 2.45
1/2" 2.00 2.00 1.090 1.02 4.45
1/2" 2.00 1.00 0.790 1.02 1.61
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.07.05.02.02 VÁLVULA DE PURGA DN 100 COMPUERTA TIPO BRIDADA DE HIERRO DUCTIL C/ELASTÓMERO und #REF! #REF! #REF!
02.01.07.05.02.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE PURGA DN 100 EN LINEA DN 110 und #REF! #REF! #REF!
Tee mixta Brida - Luflex - HD BB DN 100 - 100 mm und 1.00 1.00
Codo ho. Ductil 45° (1/8) 2 bridas DN 100 und 1.00 1.00
Codo ho. Ductil 90° (1/4) 2 bridas DN 100 und 1.00 1.00
Union flexible tipo Dresser DN 100 und 1.00 1.00
Empaquetadura de jebe enlonada DN 100 und 6.00 6.00
Brida de acero para soldar y empernar DN 100 und 5.00 5.00
Brida de acero para soldar anclaje DN 100 und 1.00 1.00
Perno incluye tuerca p/brida DN 100 mm und 48.00 48.00
Tuberia de acero SCH-40 DN 100 m 1.00 1.30 1.30
Tuberia de acero con un extremo roscado DN 100 m 1.00 1.40 1.40
02.01.07.05.02.04 MONTAJE DE VÁLVULA DE PURGA DN 100 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
02.01.07.06 PRUEBAS
02.01.07.06.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und #REF! #REF! #REF!
02.01.07.06.02 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 110MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.07.06.03 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 110MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.08.05 VALVULAS
02.01.08.05.01 VALVULAS DE AIRE DN 80 EN LINEA DN 90
02.01.08.05.01.01 CÁMARA TIPO CIRCULAR DI=1,50 M P/VÁLVULA AIRE T. NORMAL SATURADO 2,51 - 3,00 M PROF. (C-PV) und #REF! #REF! #REF!
Altura 1.915
Excavaciones terreno normal saturado a pulso hasta 3,00 m profundidad. m3 diámetro 19.43
1.00 3.10 2.52 18.98
Sumidero 1.00 0.70 0.30 0.12
Tubería de ventilación 1.00 1.00 0.500 0.67 0.34
Refine, nivelacion y compactacion en terreno normal saturado a pulso m2 8.05
1.00 3.10 7.55
1.00 1.00 0.500 0.50
Relleno compactado con material de préstamo en terrreno normal saturado a pulso m3 12.01
1.00 1.20 0.270 0.50 0.16
diámetro área
1.00 3.10 7.548 2.52 11.85
1.00 1.90 2.835
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
1/2" 2.00 4.00 1.180 1.02 9.63
1/2" 2.00 4.00 1.360 1.02 11.10
1/2" 2.00 4.00 1.470 1.02 12.00
1/2" 2.00 4.00 1.530 1.02 12.48
1/2" 2.00 2.00 1.550 1.02 6.32
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.15
1.00 1.90 1.500 1.92 2.05
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 21.83
diámetro
1.00 1.90 1.92 11.43
1.00 1.50 1.92 9.02
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
1/2" 1.00 1.00 1.300 1.02 1.33
1/2" 1.00 2.00 0.370 1.02 0.75
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.720 1.02 1.47
1/2" 1.00 2.00 0.810 1.02 1.65
1/2" 1.00 2.00 0.870 1.02 1.77
1/2" 1.00 2.00 0.920 1.02 1.88
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.950 1.02 1.94
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.690 1.02 1.41
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.510 1.02 1.04
1/2" 1.00 2.00 0.470 1.02 0.96
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.370 1.02 0.75
Refuerzo sup. e inf. 1/2" 2.00 1.00 1.200 1.02 2.45
1/2" 2.00 2.00 1.090 1.02 4.45
1/2" 2.00 1.00 0.790 1.02 1.61
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
Rejilla metálica removible p/salida de tuberia de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.08.05.01.02 VÁLVULA DE AIRE BRIDADA PARA ADESAGUE DN 80 und #REF! #REF! #REF!
02.01.08.05.01.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE AIRE DN 80 EN LINEA DN 90 und #REF! #REF! #REF!
Tee HD BBB DN 80 x 80 mm und 1.00 1.00
Transicion Luflex Brida campana DN 80 HD und 2.00 2.00
Válvula de aislamiento de bronce und 1.00 1.00
Valvula de cierre de bronce und 1.00 1.00
Valvula para suministro de agua und 1.00 1.00
Brida de acero para soldar y empernar DN 80 und 4.00 4.00
Brida de acero para soldar anclaje DN 80 und 2.00 2.00
Empaquetadura de jebe enlonada DN 80 und 5.00 5.00
Perno incluye tuerca p/brida DN 80 und 30.00 30.00
manometro incl. Accesorios und 1.00 1.00
02.01.08.05.01.04 MONTAJE DE VÁLVULA DE AIRE DN 80 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
Acero estruct. Trabajado p/losa de fondo base de buzones, cámaras, cajas (costo prom. i/d) kg 62.22
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 2.00 4.00 0.390 1.02 3.18
1/2" 2.00 4.00 0.920 1.02 7.51
Concreto f´c 280 kg/cm2 para muros de buzones, cámaras, cajas (Cemento P-V) m3 D. ext. D. int. 2.36
1.00 1.90 1.500 2.12 2.26
radio externo radio interno
1.00 0.70 0.400 0.40 0.10
Encofrado metálico (incl. Habillitacion de madera) para muro de buzones o similar m2 23.97
diámetro
1.00 1.90 2.12 12.62
1.00 1.50 2.12 9.97
1.00 0.70 0.40 0.88
1.00 0.40 0.40 0.50
Concreto f´c 280 kg/cm2 p/losa de techo de buzones, cámaras, cajas (cemento P-V) m3 0.51
diámetro área
1.00 1.90 2.835 0.20 0.51
1.00 0.60 0.283
Encofrado (incl. Habillitacion de madera) para losa de techo m2 diámetro perímetro 4.12
1.00 1.90 5.969 0.20 1.57
1.00 0.60 1.885
área
1.00 1.90 2.835 2.55
1.00 0.60 0.283
Acero estruct. Trabajado p/losa de techo (costo prom. i/d) kg 50.33
Ø Nº de veces Nº de piezas longitud peso x ml
1/2" 1.00 2.00 0.740 1.02 1.51
1/2" 1.00 2.00 1.170 1.02 2.39
1/2" 1.00 2.00 1.430 1.02 2.92
1/2" 1.00 2.00 1.620 1.02 3.30
1/2" 1.00 2.00 1.750 1.02 3.57
1/2" 1.00 2.00 1.500 1.02 3.06
1/2" 1.00 2.00 1.340 1.02 2.73
1/2" 1.00 1.00 1.300 1.02 1.33
1/2" 1.00 2.00 0.370 1.02 0.75
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.720 1.02 1.47
1/2" 1.00 2.00 0.810 1.02 1.65
1/2" 1.00 2.00 0.870 1.02 1.77
1/2" 1.00 2.00 0.920 1.02 1.88
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.950 1.02 1.94
1/2" 1.00 2.00 0.940 1.02 1.92
1/2" 1.00 2.00 0.690 1.02 1.41
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.510 1.02 1.04
1/2" 1.00 2.00 0.470 1.02 0.96
1/2" 1.00 2.00 0.580 1.02 1.18
1/2" 1.00 2.00 0.370 1.02 0.75
Refuerzo sup. e inf. 1/2" 2.00 1.00 1.200 1.02 2.45
1/2" 2.00 2.00 1.090 1.02 4.45
1/2" 2.00 1.00 0.790 1.02 1.61
Volumen
Concreto f´c 280 kg/cm2 p/colocacion de marco y tapa (cemento P-V) m3 1.00 0.06 0.06
Colocacion de losa removible de buzon, cámara o similar und 1.00 1.00
Escalera de tubo fo. Galvanizado con parantes de 1 1/2" por peldaños de 3/4" m 1.00 1.72 1.72
Marco y tapa de hierro dúctil DI=0.60 m con mecanismo de seguridad según especificación und 1.00 1.00
Ventilacion con tuberia de acero DN 150 incl. Malla metálica de proteccion und 2.00 2.00
Concreto f´c 175 para tuberia de ventilacion (Cemento P-V) m3 Largo 0.21
1.00 1.50 0.500 0.57 0.43
1.00 -1.20 0.500 0.27 -0.16
2.00 -1.70 0.150 -0.06
Puerta corrediza plancha estriada 1/5" con marco L 3/4"x1/8" incl. Candado und 1.00 1.00
Rejilla metálica removible para sumidero de Ø 0.45 PL 1"x3/16" marco L 1 1/4"x1 1/4"x3/16" m2 1.00 0.40 0.13
diámetro
Provision y colocado de grava de 1/2" - 1" m3 1.00 0.40 0.60 0.08
02.01.08.05.02.02 VÁLVULA DE PURGA DN 80 COMPUERTA TIPO BRIDADA DE HIERRO DUCTIL C/ELASTÓMERO und #REF! #REF! #REF!
02.01.08.05.02.03 SUMINISTRO INSTALACION HIDRAULICA PARA VÁLVULAS DE PURGA DN 80 EN LINEA DN 90 und #REF! #REF! #REF!
Tee mixta Brida - Luflex - HD BB DN 80 - 80 mm und 1.00 1.00
Codo ho. Ductil 45° (1/8) 2 bridas DN 80 und 1.00 1.00
Codo ho. Ductil 90° (1/4) 2 bridas DN 80 und 1.00 1.00
Union flexible tipo Dresser DN 80 und 1.00 1.00
Empaquetadura de jebe enlonada DN 80 und 6.00 6.00
Brida de acero para soldar y empernar DN 80 und 5.00 5.00
Brida de acero para soldar anclaje DN 80 und 1.00 1.00
Perno incluye tuerca p/brida DN 80 mm und 36.00 36.00
Tuberia de acero SCH-40 DN 80 m 1.00 1.30 1.30
Tuberia de acero con un extremo roscado DN 80 m 1.00 1.40 1.40
02.01.08.05.02.04 MONTAJE DE VÁLVULA DE PURGA DN 80 E INSTALACIÓN HIDRÁULICA und #REF! #REF! #REF!
02.01.08.06 PRUEBAS
02.01.08.06.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und #REF! #REF! #REF!
02.01.08.06.02 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 90MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.08.06.03 PRUEBA HIDRAULICA DE TUBERIA A PRESION DN 90MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.09.01.05 PRUEBAS
02.01.09.01.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.09.01.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
02.01.09.01.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.09.01.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 250MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.09.01.05.05 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 355MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.09.01.05.06 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 400MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.09.01.05.07 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.09.01.05.08 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 250MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.09.01.05.09 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 355MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.09.01.05.10 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 400MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.09.01.06 BUZONES
02.01.09.01.06.01 BUZONES A CAMBIAR
02.01.09.01.06.01.01 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.09.01.06.01.02 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.09.01.06.01.03 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.09.01.06.01.04 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 3,51 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.09.01.06.01.05 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 4,01 A 5,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.09.01.06.01.06 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 5,01 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.09.01.06.01.07 RECONSTRUCCIÓN DE BUZÓN III T.NORMAL SATURADO A MÁQ. 7,01 A 8,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.09.01.06.01.08 RECONSTRUCCIÓN DE BUZÓN III T.NORMAL SATURADO A MÁQ. 8,01 A 9,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.09.01.06.01.09 CAIDA ESPECIAL PARA BUZONES DN 250 und 1.00 #REF! #REF! #REF!
Concreto f'c=175 Kg/cm2 para anclajes y/o dados (Cemento P-I) m3 1.00 0.70 0.550 #REF! #REF! #REF!
Tuberia de PVC-U UF NTP ISO 4435 SN 2 DN 250 mm incl. Anillo + 2% desperdicios m 1.00 #REF! #REF! #REF!
Tee PVC - UF DN 250 x 250 mm und 1.00 1.00 1.00 1.00
Codo 90° PVC-UF DN 250 mm und 1.00 1.00 1.00 1.00
02.01.10.05 PRUEBAS
02.01.10.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.10.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
02.01.10.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.10.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.10.06 BUZONES
02.01.10.06.01 BUZONES A CAMBIAR
02.01.10.06.01.01 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,01 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.10.06.01.02 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.10.06.01.03 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.10.06.01.04 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.10.06.01.05 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.10.06.01.06 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 3,51 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.10.06.01.07 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 4,01 A 5,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.10.06.01.08 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 5,01 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.10.06.01.09 CAIDA ESPECIAL PARA BUZONES DN 250 und 1.00 #REF! #REF! #REF!
Concreto f'c=175 Kg/cm2 para anclajes y/o dados (Cemento P-I) m3 1.00 0.70 0.550 #REF! #REF! #REF!
Tuberia de PVC-U UF NTP ISO 4435 SN 2 DN 250 mm incl. Anillo + 2% desperdicios m 1.00 #REF! #REF! #REF!
Tee PVC - UF DN 250 x 250 mm und 1.00 1.00 1.00 1.00
Codo 90° PVC-UF DN 250 mm und 1.00 1.00 1.00 1.00
02.01.11.03.04 CONCRETO F´C=280 KG/CM2 PARA TAPA DE CONCRETO (CEMENTO P-V) m3 20.00 0.75 0.340 0.05 0.26 0.26
perimetro
02.01.11.03.05 ENCOFRADO (INCL. HABILITACION DE MADERA) PARA TAPA DE CONCRETO m2 20.00 2.180 0.05 2.18 2.18
02.01.11.03.06 ACERO ESTRUCTURAL TRABAJADO PARA TAPA DE CONCRETO (COSTO PROM. INCL. DESPERDICIOS) kg 38.05
Ø Nº de veces Nº de piezas longitud peso x ml
3/8" 20.00 2.00 0.680 0.58 15.78
3/8" 20.00 6.00 0.320 0.58 22.27
02.01.11.04 VARIOS
02.01.11.04.01 AGARRADERA D=1/2" und 40.00 40.00 40.00
02.01.12.01.05 PRUEBAS
02.01.12.01.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.01.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
pav. Rigido Err:504 cada 40.000 Err:504
02.01.12.01.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.01.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.01.06 BUZONES
02.01.12.01.06.01 BUZONES PROYECTADOS
02.01.12.01.06.01.01 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,01 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.02 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,26 A 1,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.03 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.04 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.05 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.06 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.07 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.08 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,51 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.09 BUZÓN II T.NORMAL SATURADO A MÁQ. 4,01 A 5,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.10 BUZÓN II T.NORMAL SATURADO A MÁQ. 5,01 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.01.06.01.11 CAIDA ESPECIAL PARA BUZONES DN 200 und 1.00 #REF! #REF! #REF!
Concreto f'c=175 Kg/cm2 para anclajes y/o dados (Cemento P-I) m3 1.00 0.65 0.500 #REF! #REF! #REF!
Tuberia de PVC-U UF NTP ISO 4435 SN 2 DN 200 mm incl. Anillo + 2% desperdicios m 1.00 #REF! #REF! #REF!
Tee PVC - UF DN 200 x 200 mm und 1.00 1.00 1.00 1.00
Codo 90° PVC-UF DN 200 mm und 1.00 1.00 1.00 1.00
02.01.12.02.01.08 ELIMINACION DE DESMONTE DE MATERIAL CONTAMINADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF!
02.01.12.02.03.01.20 DESMONTAJE Y RETIRO DE TUBERIA CSN DN 200 - 250 MM m 1.00 #REF! #REF! #REF!
02.01.12.02.03.01.21 ELIMINACION DE DESMONTE POR DESMONTAJE DE TUBERIAS R=5KM CON MAQUINARIA m3 #REF!
Tub DN 200 - 250mm
Area Radio= 0.100 Area= 0.0314
Mas porcentaje de espacios vacios
1.35 #REF! 0.0314 #REF!
02.01.12.02.05 PRUEBAS
02.01.12.02.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.02.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
pav. Rigido Err:504 cada 40.000 Err:504
02.01.12.02.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.02.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.02.06 BUZONES
02.01.12.02.06.01 BUZONES A CAMBIAR
02.01.12.02.06.01.01 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,26 A 1,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.02 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.03 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.04 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.05 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.06 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.07 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 3,51 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.08 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 5,01 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.09 SOBRE-EXCAVACION EN T-NORMAL SATURADO A PULSO m3 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.10 RELLENO CON MATERIAL DE PRESTAMO AFIRMADO (INCL.PROVISION) m3 1.00 #REF! #REF! #REF!
02.01.12.02.06.01.11 ELIMINACION DE DESMONTE EN T-NORMAL SATURADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF! #REF!
02.01.12.03.04 PRUEBAS
02.01.12.03.04.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.03.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
02.01.12.03.04.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.03.04.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.03.05 BUZONES
02.01.12.03.05.01 BUZONES PROYECTADOS
02.01.12.03.05.01.01 BUZÓN I T.NORMAL A MÁQ. 1,01 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.03.05.01.02 BUZÓN I T.NORMAL A MÁQ. 1,26 A 1,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.03.05.01.03 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.03.05.01.04 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.03.05.01.05 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.03.05.01.06 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.03.05.01.07 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.03.05.01.08 BUZÓN II T.NORMAL SATURADO A MÁQ. 5,01 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.01.08 ELIMINACIÓN DE MATERIAL CONTAMINADO EN TERRENO NORMAL R=5 KM CON MAQUINARIA m3 1.00 #REF! #REF!
02.01.12.04.03.01.32 DESMONTAJE Y RETIRO DE TUBERIA PVC DN 200 - 250 MM m 1.00 #REF! #REF! #REF!
02.01.12.04.03.01.33 DESMONTAJE Y RETIRO DE TUBERIA CSN DN 200 - 250 MM m 1.00 Err:504 Err:504 Err:504
02.01.12.04.03.01.34 ELIMINACION DE DESMONTE POR DESMONTAJE DE TUBERIAS PVC R=5KM CON MAQUINARIA m3 #REF!
Tub DN 200 - 250mm
Area Radio= 0.100 Area= 0.0314
Mas porcentaje de espacios vacios
1.35 #REF! 0.0314 #REF!
02.01.12.04.03.01.35 ELIMINACION DE DESMONTE POR DESMONTAJE DE TUBERIAS CSN R=5KM CON MAQUINARIA m3 Err:504
Tub DN 200 1.35 0.10 0.008 Err:504 Err:504
Tub DN 250 1.35 0.125 0.012 Err:504 Err:504
02.01.12.04.05 PRUEBAS
02.01.12.04.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.04.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
pav. Rigido Err:504 cada 40.000 Err:504
02.01.12.04.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.04.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.04.06 BUZONES
02.01.12.04.06.01 BUZONES A CAMBIAR
02.01.12.04.06.01.01 RECONSTRUCCION DE BUZON I T-NORMAL DE 1.01 A 1.25M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.02 RECONSTRUCCION DE BUZON I T-NORMAL DE 1.26 A 1.50M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.03 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 1.51 A 1.75M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.04 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 1.76 A 2.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.05 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 2.01 A 2.50M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.06 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 2.51 A 3.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.07 RECONSTRUCCION DE BUZON II T-NORMAL SATURADO DE 3.01 A 3.50M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.08 RECONSTRUCCION DE BUZON II T-NORMAL SATURADO DE 3.51 A 4.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.09 RECONSTRUCCION DE BUZON II T-NORMAL SATURADO DE 4.01 A 5.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.10 CAIDA ESPECIAL PARA BUZONES DN 200MM und 1.00 #REF! #REF! #REF!
Concreto f'c=175 Kg/cm2 para anclajes y/o dados (Cemento P-I) m3 1.00 0.65 0.500 #REF! #REF! #REF!
Tuberia de PVC-U UF NTP ISO 4435 SN 2 DN 200 mm incl. Anillo + 2% desperdicios m 1.00 #REF! #REF! #REF!
Tee PVC - UF DN 200 x 200 mm und 1.00 1.00 1.00 1.00
Codo 90° PVC-UF DN 200 mm und 1.00 1.00 1.00 1.00
02.01.12.04.06.01.11 SOBRE-EXCAVACION EN T-NORMAL A PULSO m3 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.12 SOBRE-EXCAVACION EN T-NORMAL SATURADO A PULSO m3 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.13 RELLENO CON MATERIAL DE PRESTAMO AFIRMADO (INCL.PROVISION) m3 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.14 ELIMINACION DE DESMONTE EN T-NORMAL R=5KM CON MAQUINARIA m3 1.00 #REF! #REF! #REF!
02.01.12.04.06.01.15 ELIMINACION DE DESMONTE EN T-NORMAL SATURADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF! #REF!
02.01.12.05.05 PRUEBAS
02.01.12.05.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.05.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
pav. Rigido Err:504 cada 40.000 Err:504
02.01.12.05.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.05.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.05.06 BUZONES
02.01.12.05.06.01 BUZONES PROYECTADOS
02.01.12.05.06.01.01 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,01 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.05.06.01.02 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,26 A 1,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.05.06.01.03 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.05.06.01.04 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.05.06.01.05 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.05.06.01.06 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.05.06.01.07 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.05.06.01.08 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,51 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.05.06.01.09 BUZÓN III T.NORMAL SATURADO A MÁQ. 6,01 A 7,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.01.09 ELIMINACION DE DESMONTE DE MATERIAL CONTAMINADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF!
02.01.12.06.03.01.35 DESMONTAJE Y RETIRO DE TUBERIA PVC DN 200 - 250 MM m 1.00 #REF! #REF! #REF!
02.01.12.06.03.01.36 DESMONTAJE Y RETIRO DE TUBERIA CSN DN 200 - 250 MM m 1.00 Err:504 Err:504 Err:504
02.01.12.06.03.01.37 DESMONTAJE Y RETIRO DE TUBERIA CSN DN 300 - 350 MM m 2.00 Err:504 Err:504 Err:504
02.01.12.06.03.01.38 DESMONTAJE Y RETIRO DE TUBERIA CSN DN 400 - 450 MM m 3.00 Err:504 Err:504 Err:504
02.01.12.06.03.01.39 DESMONTAJE Y RETIRO DE TUBERIA CSN DN 500 - 600 MM m 4.00 Err:504 Err:504 Err:504
02.01.12.06.03.01.40 ELIMINACION DE DESMONTE POR DESMONTAJE DE TUBERIAS PVC R=5KM CON MAQUINARIA m3 #REF!
Tub DN 200 - 250mm
Area Radio= 0.100 Area= 0.0314
Mas porcentaje de espacios vacios
1.35 #REF! 0.0314 #REF!
02.01.12.06.03.01.41 ELIMINACION DE DESMONTE POR DESMONTAJE DE TUBERIAS CSN R=5KM CON MAQUINARIA m3 Err:504
Tub DN 200 1.35 0.10 0.008 Err:504 Err:504
Tub DN 250 1.35 0.125 0.012 Err:504 Err:504
Tub DN 300 1.35 0.150 0.018 Err:504 Err:504
Tub DN 400 1.35 0.200 0.031 Err:504 Err:504
Tub DN 450 1.35 0.225 0.040 Err:504 Err:504
Tub DN 500 1.35 0.250 0.049 Err:504 Err:504
02.01.12.06.05 PRUEBAS
02.01.12.06.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.06.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
pav. Rigido Err:504 cada 40.000 Err:504
02.01.12.06.05.03 PRUEBA HIDRÁULICA DE TUBERÍA P/DESAGUE DN 200 MM (ZANJA TAPADA) m 1.00 #REF! #REF! #REF!
02.01.12.06.06 BUZONES
02.01.12.06.06.01 BUZONES A CAMBIAR
02.01.12.06.06.01.01 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,01 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.02 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,26 A 1,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.03 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.04 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.05 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.06 RECONSTRUCCIÓN DE BUZÓN I T.NORMAL SATURADO A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.07 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.08 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 3,51 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.09 RECONSTRUCCIÓN DE BUZÓN II T.NORMAL SATURADO A MÁQ. 4,01 A 5,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.10 RECONSTRUCCIÓN DE BUZÓN III T.NORMAL SATURADO A MÁQ. 6,01 A 7,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.11 SOBRE-EXCAVACION EN T-NORMAL SATURADO A PULSO m3 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.12 RELLENO CON MATERIAL DE PRESTAMO AFIRMADO (INCL.PROVISION) m3 1.00 #REF! #REF! #REF!
02.01.12.06.06.01.13 ELIMINACION DE DESMONTE EN T-NORMAL SATURADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF! #REF!
02.01.12.07.04 PRUEBAS
02.01.12.07.04.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.07.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
02.01.12.07.04.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.07.04.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.07.05 BUZONES
02.01.12.07.05.01 BUZONES PROYECTADOS
02.01.12.07.05.01.01 BUZÓN I T.NORMAL A MÁQ. 1,01 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.07.05.01.02 BUZÓN I T.NORMAL A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.07.05.01.03 BUZÓN I T.NORMAL A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.07.05.01.04 BUZÓN I T.NORMAL A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.07.05.01.05 BUZÓN I T.NORMAL A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.07.05.01.06 BUZÓN II T.NORMAL A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.07.05.01.07 BUZÓN II T.NORMAL SATURADO A MÁQ. 5,01 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.07.05.01.08 BUZÓN III T.NORMAL SATURADO A MÁQ. 6,01 A 7,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.07.05.01.09 BUZÓN III T.NORMAL SATURADO A MÁQ. 7,01 A 8,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.08.01.09 ELIMINACION DE DESMONTE DE MATERIAL CONTAMINADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF!
02.01.12.08.05 PRUEBAS
02.01.12.08.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.08.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
02.01.12.08.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.08.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.08.06 BUZONES
02.01.12.08.06.01 BUZONES A CAMBIAR
02.01.12.08.06.01.01 RECONSTRUCCION DE BUZON I T-NORMAL DE 1.01 A 1.25M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.08.06.01.02 RECONSTRUCCION DE BUZON II T-NORMAL SATURADO DE 4.01 A 5.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.08.06.01.03 RECONSTRUCCION DE BUZON II T-NORMAL SATURADO DE 5.01 A 6.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.08.06.01.04 SOBRE-EXCAVACION EN T-NORMAL A PULSO m3 1.00 #REF! #REF! #REF!
02.01.12.08.06.01.05 SOBRE-EXCAVACION EN T-NORMAL SATURADO A PULSO m3 1.00 #REF! #REF! #REF!
02.01.12.08.06.01.06 ELIMINACION DE DESMONTE EN T-NORMAL R=5KM CON MAQUINARIA m3 1.00 #REF! #REF! #REF!
02.01.12.08.06.01.07 ELIMINACION DE DESMONTE EN T-NORMAL SATURADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF! #REF!
02.01.12.09.04 PRUEBAS
02.01.12.09.04.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.09.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
02.01.12.09.04.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.09.04.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.09.05 BUZONES
02.01.12.09.05.01 BUZONES PROYECTADOS
02.01.12.09.05.01.01 BUZÓN I T.NORMAL A MÁQ. 0.60 A 1,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.02 BUZÓN I T.NORMAL A MÁQ. 1,00 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.03 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,25 A 1,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.04 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,50 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.05 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,75 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.06 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,00 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.07 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,50 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.08 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,00 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.09 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,50 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.10 BUZÓN II T.NORMAL SATURADO A MÁQ. 4,00 A 5,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.11 BUZÓN II T.NORMAL SATURADO A MÁQ. 5,00 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.12 BUZÓN II T.NORMAL SATURADO A MÁQ. 6,00 A 7,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.09.05.01.13 CAIDA ESPECIAL PARA BUZONES DN 200 und 1.00 #REF! #REF! #REF!
Concreto f'c=175 Kg/cm2 para anclajes y/o dados (Cemento P-I) m3 1.00 0.65 0.500 #REF! #REF! #REF!
02.01.12.10.01.09 ELIMINACION DE DESMONTE DE MATERIAL CONTAMINADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF!
02.01.12.10.03.01.38 DESMONTAJE Y RETIRO DE TUBERIA CSN DN 200 - 250 MM m 1.00 #REF! #REF! #REF!
02.01.12.10.03.01.39 ELIMINACION DE DESMONTE POR DESMONTAJE DE TUBERIAS R=5KM CON MAQUINARIA m3 #REF!
Tub DN 200 - 250mm
Area Radio= 0.100 Area= 0.0314
Mas porcentaje de espacios vacios
1.35 #REF! 0.0314 #REF!
02.01.12.10.05 PRUEBAS
02.01.12.10.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.10.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
pav. Rigido Err:504 cada 40.000 Err:504
02.01.12.10.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.10.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.10.06 BUZONES
02.01.12.10.06.01 BUZONES A CAMBIAR
02.01.12.10.06.01.01 RECONSTRUCCION DE BUZON I T-NORMAL DE 1.01 A 1.25M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.10.06.01.02 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 1.26 A 1.50M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.10.06.01.03 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 1.51 A 1.75M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.10.06.01.04 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 1.76 A 2.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.10.06.01.05 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 2.01 A 2.50M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.10.06.01.06 RECONSTRUCCION DE BUZON I T-NORMAL SATURADO DE 2.51 A 3.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.05 PRUEBAS
02.01.12.11.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.11.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIÓN) und #REF!
buzones #REF! cada 3.000 #REF!
pav. Rigido Err:504 cada 40.000 Err:504
02.01.12.11.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.11.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.11.06 BUZONES
02.01.12.11.06.01 BUZONES PROYECTADOS
02.01.12.11.06.01.01 BUZÓN I T.NORMAL A MÁQ. 1,01 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.02 BUZÓN I T.NORMAL A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.03 BUZÓN I T.NORMAL A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.04 BUZÓN I T.NORMAL A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.05 BUZÓN I T.NORMAL A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.06 BUZÓN II T.NORMAL A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.07 BUZÓN II T.NORMAL A MÁQ. 3,51 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.08 BUZÓN II T.NORMAL SATURADO A MÁQ. 4,01 A 5,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.09 BUZÓN II T.NORMAL SATURADO A MÁQ. 5,01 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.11.06.01.10 BUZÓN III T.NORMAL SATURADO A MÁQ. 6,01 A 7,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.12.01.09 ELIMINACION DE DESMONTE DE MATERIAL CONTAMINADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF!
02.01.12.12.05 PRUEBAS
02.01.12.12.05.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.12.05.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und #REF!
buzones #REF! cada 3.000 #REF!
pav. Rigido Err:504 cada 40.000 Err:504
02.01.12.12.05.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.12.05.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.12.06 BUZONES
02.01.12.12.06.01 BUZONES A CAMBIAR
02.01.12.12.06.01.01 RECONSTRUCCION DE BUZON I T-NORMAL DE 1.01 A 1.25M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.02 RECONSTRUCCION DE BUZON I T-NORMAL DE 2.01 A 2.50M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.03 RECONSTRUCCION DE BUZON I T-NORMAL DE 2.51 A 3.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.04 RECONSTRUCCION DE BUZON II T-NORMAL DE 3.01 A 3.50M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.05 RECONSTRUCCION DE BUZON II T-NORMAL SATURADO DE 3.51 A 4.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.06 RECONSTRUCCION DE BUZON II T-NORMAL SATURADO DE 4.01 A 5.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.07 RECONSTRUCCION DE BUZON II T-NORMAL SATURADO DE 5.01 A 6.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.08 SOBRE-EXCAVACION EN T-NORMAL A PULSO m3 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.09 SOBRE-EXCAVACION EN T-NORMAL SATURADO A PULSO m3 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.10 RELLENO CON MATERIAL DE PRESTAMO AFIRMADO (INCL.PROVISION) m3 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.11 ELIMINACION DE DESMONTE EN T-NORMAL R=5KM CON MAQUINARIA m3 1.00 #REF! #REF! #REF!
02.01.12.12.06.01.12 ELIMINACION DE DESMONTE EN T-NORMAL SATURADO R=5KM CON MAQUINARIA m3 1.00 #REF! #REF! #REF!
02.01.12.13.04 PRUEBAS
02.01.12.13.04.01 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und 1.00 #REF! #REF! #REF!
02.01.12.13.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und #REF!
buzones #REF! cada 3.000 #REF!
02.01.12.13.04.03 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.13.04.04 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA ABIERTA m 1.00 #REF! #REF! #REF!
02.01.12.13.04.05 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
02.01.12.13.04.06 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 200MM A ZANJA TAPADA m 1.00 #REF! #REF! #REF!
.
02.01.12.13.05 BUZONES
02.01.12.13.05.01 BUZONES PROYECTADOS
02.01.12.13.05.01.01 BUZÓN I T.NORMAL A MÁQ. 1,01 A 1,25 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.02 BUZÓN I T.NORMAL A MÁQ. 1,26 A 1,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.03 BUZÓN I T.NORMAL A MÁQ. 1,51 A 1,75 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.04 BUZÓN I T.NORMAL SATURADO A MÁQ. 1,76 A 2,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.05 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,01 A 2,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.06 BUZÓN I T.NORMAL SATURADO A MÁQ. 2,51 A 3,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.07 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,01 A 3,50 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.08 BUZÓN II T.NORMAL SATURADO A MÁQ. 3,51 A 4,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.09 BUZÓN II T.NORMAL SATURADO A MÁQ. 4,01 A 5,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.10 BUZÓN II T.NORMAL SATURADO A MÁQ. 5,01 A 6,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.11 BUZÓN III T.NORMAL SATURADO A MÁQ. 6,01 A 7,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.12.13.05.01.12 BUZÓN III T.NORMAL SATURADO A MÁQ. 7,01 A 8,00 M PROF. (ENCOFRADO EXTERIOR E INTERIOR) C-PV und 1.00 #REF! #REF! #REF!
02.01.13.01.05 CAJAS
02.01.13.01.05.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 1,011.00 1,011.00 1,011.00
02.01.13.01.05.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 1,011.00 1,011.00 1,011.00
02.01.13.01.05.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 1,011.00 1,011.00 1,011.00
02.01.13.01.06 PRUEBAS
02.01.13.01.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.01.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.01.06.03 PRUEBA DE COMPACTACIÓN DE SUELOS (PROCTO MODIF DENSIDAD CAMPO) und Err:504 Err:504 Err:504
101.00 101.00
02.01.13.02.06 PRUEBAS
02.01.13.02.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.02.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.02.06.03 PRUEBA DE COMPACTACIÓN DE SUELOS (PROCTO MODIF DENSIDAD CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.03.05 CAJAS
02.01.13.03.05.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
02.01.13.03.05.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
02.01.13.03.05.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.03.06 PRUEBAS
02.01.13.03.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.03.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 2.00 Err:504 Err:504 Err:504
02.01.13.03.06.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.04.05 CAJAS
02.01.13.04.05.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
02.01.13.04.05.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
02.01.13.04.05.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.04.06 PRUEBAS
02.01.13.04.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.04.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.04.06.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.05.06 PRUEBAS
02.01.13.05.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.05.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.05.06.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.06.05 CAJAS
02.01.13.06.05.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
02.01.13.06.05.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
02.01.13.06.05.02 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.06.06 PRUEBAS
02.01.13.06.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.06.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.06.06.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.07.04 CAJAS
02.01.13.07.04.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
02.01.13.07.04.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
02.01.13.07.04.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.07.05 PRUEBAS
02.01.13.07.05.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.07.05.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.07.05.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.08 AREA DRENAJE 04 (CONEXIONES A CAMBIAR)
02.01.13.08.01 TRABAJOS PRELIMINARES
02.01.13.08.01.01 TRAZO Y REPLANTEO PARA CONEXIÓN DOMICILIARIA und 1.00 #REF! #REF! #REF!
02.01.13.08.01.02 PROTECCION DE POSTES und 1.00 2.00 2.00 2.00
02.01.13.08.01.03 RETIRO Y REPOSICIÓN DE ÁRBOLES und 1.00 1.00 1.00 1.00
02.01.13.08.05 CAJAS
02.01.13.08.05.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
02.01.13.08.05.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
02.01.13.08.05.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.08.06 PRUEBAS
02.01.13.08.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.08.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 2.00 Err:504 Err:504 Err:504
02.01.13.08.06.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.09.04 CAJAS
02.01.13.09.04.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
02.01.13.09.04.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
02.01.13.09.04.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.09.05 PRUEBAS
02.01.13.09.05.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.09.05.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.09.05.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.10 AREA DRENAJE 05 (CONEXIONES A CAMBIAR)
02.01.13.10.01 TRABAJOS PRELIMINARES
02.01.13.10.01.01 TRAZO Y REPLANTEO PARA CONEXIÓN DOMICILIARIA und 1.00 #REF! #REF! #REF!
02.01.13.10.01.02 PROTECCION DE POSTES und 1.00 2.00 2.00 2.00
02.01.13.10.01.03 RETIRO Y REPOSICIÓN DE ÁRBOLES und 1.00 2.00 2.00 2.00
02.01.13.10.05 CAJAS
02.01.13.10.05.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
02.01.13.10.05.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
02.01.13.10.05.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.10.06 PRUEBAS
02.01.13.10.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.10.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.10.06.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.11.04 CAJAS
02.01.13.11.04.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
02.01.13.11.04.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
02.01.13.11.04.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.11.05 PRUEBAS
02.01.13.11.05.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.11.05.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.11.05.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.12 AREA DRENAJE 06 (CONEXIONES A CAMBIAR)
02.01.13.12.01 TRABAJOS PRELIMINARES
02.01.13.12.01.01 TRAZO Y REPLANTEO PARA CONEXIÓN DOMICILIARIA und 1.00 #REF! #REF! #REF!
02.01.13.12.01.02 PROTECCION DE POSTES und 1.00 1.00 1.00 1.00
02.01.13.12.01.03 RETIRO Y REPOSICIÓN DE ÁRBOLES und 1.00 1.00 1.00 1.00
02.01.13.12.02.02 DEMOLICIONES
02.01.13.12.02.02.01 DEMOLICION DE CAJA DE CONEX. DOM. DESAGÜE und 1.00 #REF! #REF! #REF!
02.01.13.12.02.02.02 ELIMINACION DE DESMONTE POR DEMOLICIONES DE CONCRETO R=5KM CON MAQUINARIA m3 #REF!
Tapa #REF! 0.66 0.370 0.04 #REF!
Losa de fondo #REF! 1.00 1.000 0.15 #REF!
Muros área
0.70 0.40 0.280 0.70 #REF!
0.66 0.37 0.244
02.01.13.12.05 CAJAS
02.01.13.12.05.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 #REF! #REF! #REF!
04.03.07.02.04.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 #REF! #REF! #REF!
04.03.07.02.04.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 #REF! #REF! #REF!
02.01.13.12.06 PRUEBAS
02.01.13.12.06.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.12.06.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.12.06.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504
#REF! #REF!
02.01.13.13 AREA DRENAJE 07 (CONEXIONES PROYECTADAS)
02.01.13.13.01 TRABAJOS PRELIMINARES
02.01.13.13.01.01 TRAZO Y REPLANTEO PARA CONEXIÓN DOMICILIARIA und 1.00 100.00 100.00 100.00
02.01.13.13.01.02 PROTECCION DE POSTES und 1.00 1.00 1.00 1.00
02.01.13.13.01.03 RETIRO Y REPOSICIÓN DE ÁRBOLES und 1.00 1.00 1.00 1.00
02.01.13.13.04 CAJAS
02.01.13.13.04.01 SUMINISTRO DE CAJA CONCRETO SIMPLE Y TAPA CONCRETO ARMADO 0.30M X 0.60M und 1.00 100.00 100.00 100.00
02.01.13.13.04.02 INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und 1.00 100.00 100.00 100.00
02.01.13.13.04.03 CONSTRUCCION DE LOSA DE CONCRETO 1.00x1.00x0.10M und 1.00 100.00 100.00 100.00
02.01.13.13.05 PRUEBAS
02.01.13.13.05.01 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA ABIERTA m 1.00 Err:504 Err:504 Err:504
02.01.13.13.05.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 160MM A ZANJA TAPADA m 1.00 Err:504 Err:504 Err:504
02.01.13.13.05.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTACIÓN-DENSIDAD DE CAMPO) und Err:504 Err:504 Err:504