ABSTRACT. This paper presents arguments to justify the need to open the mill of the Lime Plant (ARD Pucauran and
ARD Pacchac), this activity will allow to define and thereby optimize the parameters of operation and process during the
preparation of lime slurry, thus reducing operating costs, and increasing the productivity of the plant
RESUMEN: En el presente documento se exponen argumentos para justificar la necesidad de abrir el molino de la
Planta de Cal (ARD Pucaurán y ARD Pacchac), esta actividad permitirá definir y con ello optimizar los parámetros de
operación y de proceso durante la preparación de lechada de cal, por consiguiente se reducen los costos operativos, e
incrementa la productividad de la planta.
1
Gestión de Aguas.
.
3 METODOLOGIA DE CÁLCULO
Remarks Base Case: Unnoticed Change of Ball Quality (15% worse) after 1000 hrs.
Eff. Mill Diameter, ft 18.50 Liner Design : Default Position at Balls Release, wrt Vertical 45.0
Eff. Mill Length, ft 22.00 Number of Lifter Bars 19.0 19 Position at Balls Impact, wrt Vertical 45.0
Intersticial Filling, % 100.00 Lifters Spacing, L0 36.71 inches
Power Losses, % 7.00 , L1 33.01 inches Nominal DBT Performance
, L2 34.71 inches Total # of Balls # of Broken Events/
Mill Volume, m3 167.79 Lifter Height, inches 4.00 # of Cycles in Tube Balls Impact
Ore Density, ton/m3 2.80 Lifter Width, wL 2.00 inches 10,000 24 3 1.250E-05
Balls Density, ton/m3 7.75 Lifter Face Angle, (°)
Forward, f1F 12.00 (°) Resilience Gain Constant, g: 4.0
B
Important Notice: Backward, f1 12.00 (°) Default Value : 4.0
This spreadsheet may be reconfigured by the user, as best suited to the purpose of the Load Angle, f2 60.00 (°)
evaluation or the actual data available. hx 17.85 inches
For instance, if kWh readings are available for every time period, Column R may be
converted into data input cells and then Columns S to Y may be back-calculated on that
basis. Lifting Cavity Filling, m3/lifter 0.0526
To unprotect the spreadsheet use the password JES. Lifting Cavity Filling, % 9.0
Voids Fraction in Lifting Cavity, % 35.0
From last row (period) below:
24.0 6000.0 12000.0 500.0 72.00 1.862 224.58 0.00 35.97 48.30 5.395 28.79 28.79 72.00 83992.51 7.00
Figura 2. Plantilla de cálculo “Dynamic Evolution of Ball Charge Composition as a Result of Variable Ball Recharges and
Operating Conditions” para determiner la recarga dinámica de bolas al molino.