Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Chapi Lix
Chapi Lix
(Material transicional para MYSRL: mineral con contenido de CuCN>250ppm hasta 1500 ppm).
Dilution Water
Linear Trash
Screens
SAG
MILLING
Cyclones
Jaw
Crusher
PRE-LEACH
THICKENER
Flocculant
Gypsum
Recycle
Lime &
Cyanide
EXISTING AT
AGGLOMERATOR
Sump &
Pump
PRIMARY CRUSHER
(Existing)
Pre-Leach
Thickener
GOLD LEACH
Flocculant
CCD CIRCUIT
5 Stages
Flocculant
CCD Wash Solution
(LQ Barren)
Stripping & Adsorption Columns
(1 Set installed Initially, 5
eventually)
Lime &
Cyanide
Leach Circuit
(6 Tanks @ 24 hrs)
Flocculant
NaHS &
H2SO4
Reclaimed
Water to LQ
Leach Pads
AVR CIRCUIT
NaOH
Recovered NaCN
To Process Water Tank
CONCENTRATE SALES
NaCN Recycle
AVR Bypass
Lime
Flocculant
SART Neutralization
Tanks (4 Stages)
Pregnant Solution
Transfer to LQ
Gypsum
Thickener
SART NEUTRALIZATION
Gypsum Recycle to
Pre-leach Thickener
Eluate Treatment at
Yanacocha Norte
Eluate
Carbon Treatment
At La Quinua
Carbon
La Quinua Carbon
Adsorption Circuit
4. Parmetros de operacin:
1200
16000
1000
14000
800
10000
600
8000
6000
t/h
kW
12000
400
4000
200
2000
6/
25
/2
00
8/
25 8
/2
00
10
8
/2
5/
20
12
08
/2
5/
20
0
2/
25 8
/2
4/ 0 09
25
/2
00
6/
25 9
/2
00
8/
25 9
/2
00
10
9
/2
5/
20
12
09
/2
5/
20
0
2/
25 9
/2
4/ 0 10
25
/2
01
6/
25 0
/2
01
8/
25 0
/2
01
10
0
/2
5/
20
12
10
/2
5/
20
1
2/
25 0
/2
4/ 0 11
25
/2
01
1
Mill Power
Mill Throughput
5. Objetivos:
1,600,000
16,000
1,400,000
14,000
1,200,000
12,000
800,000
8,000
Au Onzas
KToneladas
1,000,000
10,000
600,000
6,000
400,000
4,000
200,000
2,000
En
er
o08
M
ar
zo
-0
8
M
ay
o08
Ju
lio
Se
-0
pt
8
ie
m
br
N
eov
08
ie
m
br
e08
En
er
o09
M
ar
zo
-0
9
M
ay
o09
Ju
lio
Se
-0
pt
9
ie
m
br
N
e
-0
ov
9
ie
m
br
e09
En
er
o10
M
ar
zo
-1
0
M
ay
o10
Ju
lio
Se
-1
pt
0
ie
m
br
N
e
-1
ov
0
ie
m
br
e10
En
er
o11
M
ar
zo
-1
1
Actual Throughput
Forecast Throughput
Actual Au Onzas
Forcast Au nzas
Figura 4: Tonelaje procesado y onzas de oro producidas en los aos 2008 al 2011.
Test 3
Test 1
Linea Base
25,000.00
20,000.00
Acumulate Tonnes
15,000.00
10,000.00
Prom. Test 7 :
Prom. Test 1:
Prom. Test 3:
Prom. Lnea B:
5,000.00
850 tn/hr
770 tn/hr
710 tn/hr
735 tn/hr
1,393
1,345
1,297
1,249
1,201
1,153
1,105
961
1,057
913
1,009
865
817
769
721
673
625
577
529
481
433
385
337
289
241
193
145
97
49
Minute
160
140
120
mm
100
80
60
40
20
0
Test 1
Test 3
Test 7
Recuperacin Au 2010
Media Consumption
4.50
90%
4.00
80%
3.50
70%
60%
2.50
50%
2.00
40%
Actual
tal
bre
To
mb
re
iem
vie
Dic
Oc
tub
re
No
PLAN
9. P80 y Recuperacin:
Con el incremento de tonelaje no se han logrado
mejoras sustanciales en el producto de molienda. La
reduccin del dimetro de bolas, el cambio de
diseo de los revestimientos de acero y la reduccin
del rea pasante de las parrillas no han tenido
resultados significativos en la mejora del producto
de molienda. El P80 se comporta de acuerdo al
mineral alimentado, as para el mineral fino de
Chaquicocha logramos un P80 de aproximadamente
140 um y con mineral mas duro y abrasivo de El
Tapado logramos un P80 cercano a los 170 um. Ver
figura 21.
1200
300
1000
250
800
200
600
150
400
100
200
50
0
6/
25
/2
8/ 0 08
25
/
10 20 0
8
/2
5/
12 2 00
8
/2
5/
2
2/ 008
25
/2
4/ 0 09
25
/2
6/ 0 09
25
/2
8/ 0 09
25
/
10 20 0
9
/2
5/
12 2 00
9
/2
5/
2
2/ 009
25
/2
4/ 0 10
25
/2
6/ 0 10
25
/2
8/ 0 10
25
/
10 20 1
0
/2
5/
12 2 01
0
/2
5/
2
2/ 010
25
/2
4/ 0 11
25
/2
01
1
microns
t/h
Se
ptie
mb
re
Se
p08
No
v08
Ja
n09
M
ar
-0
9
M
ay
-0
9
Ju
l-0
9
Se
p09
No
v09
Ja
n10
M
ar
-1
0
M
ay
-1
0
Ju
l-1
0
Se
p10
No
v10
Ja
n11
M
ar
-1
1
-0
8
Ju
l
0%
Juli
10%
0.00
Ag
o
20%
0.50
En
ero
1.00
sto
30%
36 Hi Hi
Jun
io
54 Hi Hi Reline
54 Hi Hi 2 Piece
Ab
ri
FE Shell Liner
Ma
yo
New 54 Hi Lo 25o
Ma
rzo
1.50
Fe
bre
ro
kg/t
3.00
Throughput t/h
P80 microns
10
13. SART:
La planta SART oper eficientemente desde
diciembre 2,008 hasta enero del 2,011 de manera
intermitente debido a la presencia del mineral
transicional.
Las leyes de plata y cobre cianurable del mineral
transicional no superaron los 50 ppm y 700 ppm
respectivamente.
La eficiencia de precipitacin de plata y cobre se
mantuvo en un 90% y 70% respectivamente. Ver
figura 28.
11
60
50
100%
40
98%
30
96%
20
Ag
Cu
94%
10
0
92%
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
43
90%
N de muestra
88%
86%
84%
400,000
400
350,000
350
300,000
300
250,000
250
200,000
200
150,000
150
100,000
100
50,000
50
Usage
Utilization
Jun
-11
Feb
-11
-10
Nov
0
Ago
-1
-10
May
0
Ene
-1
09
Oct-
09
Jul-
Mar-
Dic
09
0
-08
0
8
2010
Ao
Oz Au
Oz Ag, Lb Cu
2009
Disponibilidad
Produccin SART
Sep
-0
82%
2008
Fecha
75
Au onzas
70
Extraccin de Oro, %
Cu Libras
65
60
Profile 1
55
Profile 2
Promedio
50
0
12
16
Tiempo de Lixiviacin, h
20
24
100
90
Extraccin Au : %
Ag onzas
80
70
Malla 70 ( 212 micras)
60
50
300
350
400
450
500
550
600
650
700
Concentracin CN ppm
12
13
de
Masa,
Modelamiento
1000
100
10
0.1
0.01
0.01
0.1
size (mm)
10
100
1000
Vortex
mm
Apex Ciclones Produccin P80 slidos slidos Presin Flujo de Descarga Flujo de Carga Consumo Nivel de Flujo de
O/F Feed cicloneo bombeo SAG
U/F circulante Potencia carga total Pebbles
mm
N
tph
um %
%
kPa
m/h
m/h
tph
%
kW
%
t/h
Base Case
230
170
755
144
40
58
101
2288
1260
1309
173
14100
21
25
SIM1
230
170
700
125
33
54
93
2692
1372
1496
214
14136
21
25
SIM2
230
180
680
121
33
54
99
2769
1410
1578
232
14150
21
24
SIM3
191
170
680
122
35
56
115
2604
1378
1564
230
14145
21
24
Variables
14
17. Conclusiones
Las parrillas de goma con alma de acero
solucionaron el problema de taponamiento
existente en las parrillas de acero. Se sigue
15
18. Referencias:
Gold Mill Project, Control Philosophy 23520000-70CP-001. 14 April 2007.
J. Seidel, Review of YGM Grinding Operations.
March 2,010.
Jankovic, E. Nozawa, K. Duffy, R. Valle, W.
Valery, Review and Optimisation of the
Yanacocha Grinding Circuit. December 2,010.
G. Guzmn, V. Mamani, H. Arvalo, S. Vicua,
L. Vargas, B. Burger, SART/AVR Circuit Design
and Operation at Yanacocha Gold Mill. 2,009.
YGM daily reports. March 2,008 to April 2,011.
16
17