Está en la página 1de 56

PLANTA BAJA

PRIMERA
PLANTA
PLANTA ALTA

CASA SR. GOMEZ


TABLA DE AMBIENTES
No. LOCAL
1 DORMITORIO DE SERVICIO
2 LAVANDERIA
3 BAO
4 CUARTO VACIO
5 JARDIN
TOTAL PLANTA
6 COMEDOR Y ESTAR
7 COCINA
8 BAO
9 INGRESO
10 GARAJE
TOTAL PLANTA
11 DORMITORIO 1
12 DORMITORIO 2
13 DORMITORIO 3
14 BAO
15 BAO PRIVADO DORMITORIO 3
16 TERRAZA
17 BALCON
18 ESTAR
TOTAL PLANTA

No.Veces ancho longitu


1
2.19
3.4
1
1.65
3.4
1
1.28
2.38
1
6.92
3.1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

3.29
2.04

3.37
1.82

3.68
2.29
3.29
2.04
2.04
3.64
2.63
4.68

4.18
3.68
3.68
2.79
3.29
1.00
1.16
3.29

Montantes PVC D=

INST SANITARIA PA

Bomba de 4 HP
Camara Inspecci
Camara Registro =
Alc Sanit PVC DN4
Alc Pluvial PVC DN

INST ELECTRICA P
Tablero Principal
Acometida a la red
Iluminacin Exteri

INST GAS NATURA


Calefon
Inst gas natural

altura

AREA
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.7
0
0
2.25
2.25
2.25
2.25
2.25
0
0
2.25

total

7.45
5.61
3.05
18.20
34.30
45.80
12.60
3.71
8.50
22.15
92.76
15.38
8.43
12.11
5.69
6.71
3.64
3.05
14.55
69.56
196.63

PERIMETRO VOLUMEN

Observaciones

INSTALACION SANITARIA DEPTO


Inodoro
pza
Lavamanos
pza
Ducha
pza
Jacuzzi
pza
Lavanderia
pza
Lavaplatos
pza
Rejillas piso
pza
Calefn
pza
Inst.AP
Punto
Inst.ACS
Punto
Inst.Alc
Punto
BS PVC D=4"
m
BP PVC D=4"
m
Montantes PVC D=2"
m
Accesorios
pza
INSTALACION ELECTRICA DEPTO
Inst ELT
Punto
Tablero Distr.
Punto
INST SANITARIA PARA PLANTA BAJA EDIFICIO
Bomba de 4 HP
Camara Inspeccin =
Camara Registro =
Alc Sanit PVC DN4"=
Alc Pluvial PVC DN4"=

pza
pza
pza
m
m

ALBAILERIA DEPTO
Ventanas Planta Tipo =
Puertas Planta Tipo =
Muros de Ladrillo =
Cielos Falsos =
Revoque Cielos =
Revoque frotachado =
Revoque con estuco =
Pintura latex interior =
Pintura al oleo =
Revoque exterior =
Pintura exterior =
Contrapisos =
Piso de porcelanato =
Piso Cermica Nacional =
Meson =
Puertas de madera =
Puerta de aluminio =
Ventanas de Aluminio =
Piso de parquetn =
Revestimiento muros porcelanato =
Revestimiento muros con cermica =
Piso de Alfombra =
Dinteles en puertas =
Botaguas de hormign armado =

INST ELECTRICA PARA TODO SIN DEPTOS


Tablero Principal
pza
Acometida a la red
Global
Iluminacin Exterior
Punto
INST GAS NATURAL DEPTOS
Inst gas natural

pza
Punto

uros porcelanato =
uros con cermica =

mign armado =

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m
m

HORMIGON ARMADO EDIFICIO (Ver Plano Estructural CLQ)


Fundaciones de Ho.Ao. =
Columnas de Ho.Ao. =
Vigas de Ho.Ao. =
Losa Alivianada de Ho. Ao. =
Escaleras de Ho.Ao. =
Tanques de Ho.Ao. =
Rampa de Ho. Ao. =
Muro de contencin de Ho.Ao. =
Losa llena de Ho.Ao. En terraza =
Contrapiso impermeable terraza =
Cermica nacional en terraza =
Contrapiso sobre empedrado en stano =
Excavacin con maquinaria =
Hormign pobre fundaciones =
Excavacin maquinaria fundaciones =
Relleno con compactacin =
Drenaje de muros de contencin =
Transporte de escombros =
Revestimiento ceramica escaleras =
NOTA.- Estos volumenes solamente son estimados

Plano Estructural CLQ)

son estimados

m3
m3
m3
m2
m3
pza
m2
m3
m2
m2
m2
m2
m3b
m3
m3b
m3c
Global
m3s
m2

TABLA PARA COMPUTOS METRICOS DE FUNDACIONES

No.

Zapata

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

A1
A2
A3
B3
B4
D3
D4
D5
E1
E2
E`5
F1
F2
F3
F5
G2
G3
G5

Zapatas
A
B
1.1
1.1
1.35
1.6
0.8
0.8
1.2
1.2
0.8
0.8
1.3
1.6
1.35
1.35
0.8
0.8
1.35
1.35
1.55
2.15
0.8
0.8
0.95
0.95
1.6
1.6
1.55
1.85
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

Columna
a
b
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.35
0.25
0.25
0.25
0.25
0.3
0.3
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

Alturas
h1
Ht
0.25
0.5
0.25
0.65
0.25
0.3
0.25
0.55
0.25
0.3
0.25
0.6
0.25
0.65
0.25
0.3
0.25
0.65
0.25
0.75
0.25
0.3
0.25
0.3
0.25
0.8
0.25
0.85
0.25
0.3
0.25
0.3
0.25
0.3
0.25
0.3

Rec y Alt. Util


r
d
0.05
0.45
0.05
0.6
0.05
0.25
0.05
0.5
0.05
0.25
0.05
0.55
0.05
0.6
0.05
0.25
0.05
0.6
0.05
0.7
0.05
0.25
0.05
0.25
0.05
0.75
0.05
0.8
0.05
0.25
0.05
0.25
0.05
0.25
0.05
0.25

e
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

at
0.35
0.40
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.40
0.35
0.35
0.40
0.35
0.35
0.35
0.35
0.35

bt
0.35
0.35
0.35
0.35
0.35
0.40
0.35
0.35
0.35
0.45
0.35
0.35
0.40
0.40
0.35
0.35
0.35
0.35

MACHONES ZAPATA-VIGA ARRIOSTRE


No.

Zapata

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

A1
A2
A3
B3
B4
D3
D4
D5
E1
E2
E`5
F1
F2
F3
F5
G2
G3
G5

Columna
a
b
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.35
0.25
0.25
0.25
0.25
0.3
0.3
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

Alturas
Zapata
0.5
0.65
0.3
0.55
0.3
0.6
0.65
0.3
0.65
0.75
0.3
0.3
0.8
0.85
0.3
0.3
0.3
0.3

Altura
Excavacion
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

Altura
Viga arriostre
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

Area
machon
0.063
0.075
0.063
0.063
0.063
0.075
0.063
0.063
0.063
0.105
0.063
0.063
0.090
0.075
0.063
0.063
0.063
0.063

TABLA PARA COMPUTOS METRICOS PARA VIGA DE ARRIOSTRE

N
1
2
3
4
5
6

EJE
A
B
D
E
E`
F

DE:
1
3
3
1
3
1

A:
3
4
5
2
5
5

ZAPATAS CORRIDAS EN EL EJE "Y"


Unidad N rep
largo ancho
m3
1
7.15
0.25
m3
1
2.25
0.25
m3
1
4.60
0.25
m3
1
3.70
0.25
m3
1
4.30
0.25
m3
1
11.00
0.25

altura
0.35
0.35
0.35
0.35
0.35
0.35

area
0.09
0.09
0.09
0.09
0.09
0.09

vol
0.63
0.20
0.40
0.32
0.38
0.96

Total
0.63
0.20
0.40
0.32
0.38
0.96

Altura
machon
0.75
0.60
0.95
0.70
0.95
0.65
0.60
0.95
0.60
0.50
0.95
0.95
0.45
0.40
0.95
0.95
0.95
0.95

m3

6.70
39.70

0.25

0.35

0.09

0.59

0.59
3.47

[m3]

Total
0.79
1.09
1.09
0.18
0.72
3.86

[m3]

TABLA PARA COMPUTOS METRICOS PARA VIGA DE ARRIOSTRE

N
1
2
3
4
5

EJE
1
2
3
4
5

DE:
A
A
A
B
D

A:
F
G
G
D
G

ZAPATAS CORRIDAS EN EL EJE "X"


Unidad N rep
largo ancho
m3
1
9.00
0.25
m3
1
12.40
0.25
m3
1
12.40
0.25
m3
1
2.10
0.25
m3
1
8.20
0.25
44.10

altura
0.35
0.35
0.35
0.35
0.35

area
0.09
0.09
0.09
0.09
0.09

vol
0.79
1.09
1.09
0.18
0.72

COL

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

A1
A2
A3
B3
B4
D3
D4
D5
E1
E2
E`5
F1
F2
F3
F5
G2
G3
G5

No.

COL

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

A1
A2
A3
B3
B4
D3
D4
D5
E1
E2
E`5
F1
F2
F3
F5
G2
G3
G5

Columna
a
b
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.35
0.25
0.25
0.25
0.25
0.3
0.3
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

Area
COLUMNA
0.063
0.075
0.063
0.063
0.063
0.075
0.063
0.063
0.063
0.105
0.063
0.063
0.090
0.075
0.063
0.063
0.063
0.063

Columna
a
b
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.35
0.25
0.25
0.25
0.25
0.3
0.3
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

Area
COLUMNA
0.063
0.075
0.063
0.063
0.063
0.075
0.063
0.063
0.063
0.105
0.063
0.063
0.090
0.075
0.063
0.063
0.063
0.063

Altura
COLUMNA
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
total
Altura
COLUMNA
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40

(m3)
Volumen Ho.Ao.
0.150
0.180
0.150
0.150
0.150
0.180
0.150
0.150
0.150
0.252
0.150
0.150
0.216
0.180
0.150
0.150
0.150
0.150
2.958
(m3)
Volumen Ho.Ao.
0.150
0.180
0.150
0.150
0.150
0.180
0.150
0.150
0.150
0.252
0.150
0.150
0.216
0.180
0.150
0.150
0.150
0.150

PRIMER NIVEL

No.

PLANTA BAJA

TABLA PARA COMPUTOS METRICOS COLUMNAS

P
COL

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

A1
A2
A3
B3
B4
D3
D4
D5
E1
E2
E`5
F1
F2
F3
F5
G2
G3
G5

N
1
2
3
4
5
6

N
1
2
3
4
5

N
1
2
3
4
5

EJE
A
B
D
E`
F
G

EJE
1
2
3
4
5

EJE
A
B
D
F
BALCON1

DE:
1
3
3
3
3
2

DE:
A
A
A
B
D

DE:
1
3
3
1

Area
COLUMNA
0.063
0.075
0.063
0.063
0.063
0.075
0.063
0.000
0.063
0.105
0.000
0.063
0.090
0.075
0.000
0.000
0.000
0.000

total
Altura
COLUMNA
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
2.35
total

2.958
(m3)
Volumen Ho.Ao.
0.147
0.176
0.147
0.147
0.147
0.176
0.147
0.000
0.147
0.247
0.000
0.147
0.212
0.176
0.000
0.000
0.000
0.000
2.015

A:
3
4
5
5
5
5

COMPUTOS METRICOS PARA VIGAS


VIGAS EN EL EJE "Y"
Unidad N rep
largo ancho altura
m3
1
7.22
0.20
0.40
m3
1
2.28
0.20
0.30
m3
1
4.68
0.20
0.35
m3
1
4.35
0.20
0.35
m3
1
11.11
0.20
0.40
m3
1
6.76
0.20
0.40

A:
F
G
G
D
G

COMPUTOS METRICOS PARA VIGAS


VIGAS EN EL EJE "X"
Unidad N rep
largo ancho altura
m3
1
9.13
0.25
0.50
m3
1
12.47
0.25
0.50
m3
1
12.47
0.25
0.35
m3
1
2.16
0.20
0.30
m3
1
8.25
0.20
0.30

A:
3
4
4
3

COMPUTOS METRICOS PARA VIGAS


VIGAS EN EL EJE "Y"
Unidad N rep
largo ancho altura
m3
1
7.22
0.20
0.40
m3
1
2.28
0.20
0.30
m3
1
2.28
0.20
0.30
m3
1
7.22
0.20
0.40
m3
1
5.45
0.20
0.30

area
0.08
0.06
0.07
0.07
0.08
0.08

area
0.13
0.13
0.09
0.06
0.06

area
0.08
0.06
0.06
0.08
0.06

SEGUNDO NIVEL

No.

Columna
a
b
0.25
0.25
0.3
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.3
0.25
0.25
0
0
0.25
0.25
0.3
0.35
0
0
0.25
0.25
0.3
0.3
0.25
0.3
0
0
0
0
0
0
0
0

vol
0.58
0.14
0.33
0.30
0.89
0.54

vol
1.14
1.56
1.09
0.13
0.50

vol
0.58
0.14
0.14
0.58
0.33

Total
0.58
0.14
0.33
0.30
0.89
0.54
2.78

[m3]

Total
1.14
1.56
1.09
0.13
0.50
4.42

[m3]

Total
0.58
0.14
0.14
0.58
0.33

N
1
2
3
4

N
1
2

N
1
2
3

BALCON 2

EJE
1
2
3
4

EJE
A
F

EJE
1
2
3

m3

DE:
A
A
A
B

DE:
1
1

DE:
A
A
A

A:
F
F
F
D

3.80

0.20

0.30

COMPUTOS METRICOS PARA VIGAS


VIGAS EN EL EJE "X"
Unidad N rep
largo ancho altura
m3
1
9.13
0.25
0.50
m3
1
9.13
0.25
0.50
m3
1
11.16
0.20
0.40
m3
1
2.16
0.20
0.30

A:
3
3

COMPUTOS METRICOS PARA VIGAS


VIGAS EN EL EJE "Y"
Unidad N rep
largo ancho altura
m3
1
7.25
0.20
0.30
m3
1
7.25
0.20
0.30

A:
F
F
F

COMPUTOS METRICOS PARA VIGAS


VIGAS EN EL EJE "X"
Unidad N rep
largo ancho altura
m3
1
9.15
0.20
0.30
m3
1
9.15
0.20
0.30
m3
1
9.15
0.20
0.30

0.06

area
0.13
0.13
0.08
0.06

area
0.06
0.06

area
0.06
0.06
0.06

0.23

vol
1.14
1.14
0.89
0.13

vol
0.44
0.44

vol
0.55
0.55
0.55

0.23
1.98

[m3]

Total
1.14
1.14
0.89
0.13
3.30

[m3]

Total
0.44
0.44
0.87

[m3]

Total
0.55
0.55
0.55
1.65

[m3]

DE FUNDACIONES

Area Sup
0.1225
0.14
0.1225
0.1225
0.1225
0.14
0.1225
0.1225
0.1225
0.18
0.1225
0.1225
0.16
0.14
0.1225
0.1225
0.1225
0.1225

Altura
machon
0.75
0.60
0.95
0.70
0.95
0.65
0.60
0.95
0.60
0.50
0.95
0.95
0.45
0.40
0.95
0.95
0.95
0.95

(m3)
(m3)
Area Inf Raiz Asup*Ainf
Volumen Ho.Ao.
Volumen Ho. Pobre
1.21
0.385
0.589
0.061
2.16
0.550
1.157
0.108
0.64
0.280
0.264
0.032
1.44
0.420
0.723
0.072
0.64
0.280
0.264
0.032
2.08
0.540
1.072
0.104
1.8225
0.473
0.979
0.091
0.64
0.280
0.264
0.032
1.8225
0.473
0.979
0.091
3.3325
0.774
1.905
0.167
0.64
0.280
0.264
0.032
0.9025
0.333
0.361
0.045
2.56
0.640
1.536
0.128
2.8675
0.634
1.749
0.143
0.64
0.280
0.264
0.032
0.64
0.280
0.264
0.032
0.64
0.280
0.264
0.032
0.64
0.280
0.264
0.032
TOTAL
13.165
1.266

(m3)
Volumen Ho.Ao.
0.047
0.045
0.059
0.044
0.059
0.049
0.038
0.059
0.038
0.053
0.059
0.059
0.041
0.030
0.059
0.059
0.059
0.059
0.917

RIMER NIVEL

PLANTA BAJA

ENCADENADO TECHO

PRIMER NIVEL

Armadura Principal en A
En "X"
Numero
barras
8
9
6
8
6
11
9
6
9
8
6
8
10
8
6
6
6
6

Diametro
Fe
12
12
12
12
12
12
12
12
12
16
12
12
16
16
12
12
12
12

En "Y"
Numero
barras
8
11
6
8
6
9
9
6
9
10
6
8
8
10
6
6
6
6

Diametro
Fe
12
12
12
12
12
12
12
12
12
16
12
12
16
16
12
12
12
12

En "X"
Parrilla
a1
1.00
1.25
0.70
1.10
0.70
1.20
1.25
0.70
1.25
1.45
0.70
0.85
1.50
1.45
0.70
0.70
0.70
0.70

En "Y"
Anclaje
l1
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

Parrilla
a2
1.00
1.50
0.70
1.10
0.70
1.50
1.25
0.70
1.25
2.05
0.70
0.85
1.50
1.75
0.70
0.70
0.70
0.70

Anclaje
l2
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

Longitud
TOTAL
19.20
31.75
10.80
20.80
10.80
30.70
26.10
10.80
26.10
35.70
10.80
16.80
30.60
32.70
10.80
10.80
10.80
10.80

Armadura adicional (De piel)


No.Barras
de 12 m
1.60
2.65
0.90
1.73
0.90
2.56
2.18
0.90
2.18
2.98
0.90
1.40
2.55
2.73
0.90
0.90
0.90
0.90

horizontal
h1

Vertical
v1

Inclinada
i1

horizontal
h1

COMPRA
Inclinada
i2

Vertical
v2

Longitud
TOTAL

COMPRA
No.Barras
de 12 m

Peso
Total

PESO
TOTAL Fe
#REF!

Cuantia
Fe Fund.
#REF!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

TABLA PARA COMPUTOS METRICOS DE EXCAVACION

No.

Zapata

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

A1
A2
A3
B3
B4
D3
D4
D5
E1
E2
E`5
F1
F2
F3
F5
G2
G3
G5

Zapatas
A
B
1.1
1.1
1.35
1.6
0.8
0.8
1.2
1.2
0.8
0.8
1.3
1.6
1.35
1.35
0.8
0.8
1.35
1.35
1.55
2.15
0.8
0.8
0.95
0.95
1.6
1.6
1.55
1.85
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

EXCAVACION
a
b
1.2
1.2
1.45
1.7
0.9
0.9
1.3
1.3
0.9
0.9
1.4
1.7
1.45
1.45
0.9
0.9
1.45
1.45
1.65
2.25
0.9
0.9
1.05
1.05
1.7
1.7
1.65
1.95
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9

Alturas
excavacion
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.8
1.5
1.5
1.8
1.5
1.5
1.5
1.5
1.5
1.5
1.5

Area
excavacion
1.44
2.47
0.81
1.69
0.81
2.38
2.10
0.81
2.10
3.71
0.81
1.10
2.89
3.22
0.81
0.81
0.81
0.81

Vol. Exca.
banco
2.16
3.70
1.22
2.54
1.22
3.57
3.15
1.46
3.15
5.57
1.46
1.65
4.34
4.83
1.22
1.22
1.22
1.22
44.86

TABLA PARA COMPUTOS METRICOS PARA EXCAVACION VIGA DE ARRIOSTRE

N
1
2
3
4
5
6
7

EJE
A
B
D
E
E`
F
G

DE:
1
3
3
1
3
1
2

A:
3
4
5
2
5
5
5

ZAPATAS CORRIDAS EN EL EJE "Y"


Unidad N rep
largo ancho
m3
1
7.22
0.35
m3
1
2.28
0.35
m3
1
4.68
0.35
m3
1
3.78
0.35
m3
1
4.37
0.35
m3
1
11.13
0.35
m3
1
6.78
0.35
40.24

altura
0.10
0.10
0.10
0.10
0.10
0.10
0.10

area
0.04
0.04
0.04
0.04
0.04
0.04
0.04

vol
0.25
0.08
0.16
0.13
0.15
0.39
0.24

Total
0.25
0.08
0.16
0.13
0.15
0.39
0.24
1.41

[m3]

Total
0.32
0.44
0.44
0.08
0.29
1.56

[m3]

TABLA PARA COMPUTOS METRICOS PARA EXCAVACION VIGA DE ARRIOSTRE

N
1
2
3
4
5

EJE
1
2
3
4
5

DE:
A
A
A
B
D

A:
F
G
G
D
G

ZAPATAS CORRIDAS EN EL EJE "X"


Unidad N rep
largo ancho altura
m3
1
9.13
0.35
0.10
m3
1
12.49
0.35
0.10
m3
1
12.49
0.35
0.10
m3
1
2.16
0.35
0.10
m3
1
8.27
0.35
0.10
44.54

area
0.04
0.04
0.04
0.04
0.04

vol
0.32
0.44
0.44
0.08
0.29

47.83

TABLA DE COMPUTOS METRICOS PARA MUROS PL


MUROS DE MAMPOSTERIA EN EL EJE "Y"
EJE De: A:

Ventana 3

Vtotal

largo

ancho

alto

area

vol.

Lv

Hv

Lv

Hv

Lv

Hv

[m2]

Muro de ladrillo

m2

3.55

2.5

8.88

2.00

1.46

0.00

0.00

0.00

0.00

2.92

E`+ 2

Muro de ladrillo

m2

3.55

2.5

8.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2+

Muro de ladrillo

m2

2.6

2.5

6.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Unidad N rep

Ventana 2

D+

DENOMINACION

Ventana 1

2+

Muro de ladrillo

m2

2.5

2.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

F+

2+

Muro de ladrillo

m2

2.6

2.5

6.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

3.9

2.5

9.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

16

32.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

7.5

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

6.7

13.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Vtotal

2.92

2.00
MUROS DE MAMPOSTERIA EN EL EJE "X"
EJE De: A:
2

D+ E`+

2 E`+

DENOMINACION

Unidad N rep

0.00
Ventana 2

Ventana 3

largo

ancho

alto

area

vol.

Lv

Ventana 1
Hv

Lv

Hv

Lv

Hv

Vtotal
[m2]

Muro de ladrillo

m2

2.3

2.5

5.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

1.7

2.5

4.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

F+

Muro de ladrillo

m2

1.3

2.5

3.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

F+

Muro de ladrillo

m2

1.7

2.5

4.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2+

F+

Muro de ladrillo

m2

1.3

2.5

3.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

D+ E`+

Muro de ladrillo

m2

2.3

2.5

5.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3 E`+

Muro de ladrillo

m2

1.7

2.5

4.25

1.50

1.46

0.00

0.00

0.00

0.00

2.19

Muro de ladrillo

m2

12.45

24.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

9.3

18.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

3.4

6.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Vtotal

2.19

1.50

0.00

TABLA DE COMPUTOS METRICOS PARA MUROS PRI


MUROS DE MAMPOSTERIA EN EL EJE "Y"
EJE De: A:

DENOMINACION

Unidad N rep

Ventana 1

Ventana 2

Ventana 3

Vtotal

largo

ancho

alto

area

vol.

Lv

Hv

Lv

Hv

Lv

Hv

[m2]

2+

Muro de ladrillo

m2

5.3

2.5

13.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2+

Muro de ladrillo

m2

1.9

2.5

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2+

Muro de ladrillo

m2

1.9

2.5

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

3.4

2.5

8.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

D+ 2-

Muro de ladrillo

m2

1.4

2.5

3.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2-

Muro de ladrillo

m2

2.75

2.5

6.88

1.50

2.00

0.00

0.00

0.00

0.00

3.00

2-

Muro de ladrillo

m2

2.2

2.5

5.50

2.20

2.00

0.00

0.00

0.00

0.00

4.40

Muro de ladrillo

m2

6.8

2.5

17.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Vtotal

7.40

3.70
MUROS DE MAMPOSTERIA EN EL EJE "X"
EJE De: A:

DENOMINACION

Unidad N rep

0.00

Ventana 1

Ventana 2

Ventana 3

Vtotal

largo

ancho

alto

area

vol.

Lv

Hv

Lv

Hv

Lv

Hv

[m2]

Muro de ladrillo

m2

9.2

2.5

23.00

3.54

2.00

1.79

2.00

3.24

2.00

17.14

2-

F-

Muro de ladrillo

m2

1.45

2.5

3.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

F-

Muro de ladrillo

m2

2.5

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2+

Muro de ladrillo

m2

2.1

2.5

5.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.1

2.5

5.25

1.50

0.60

0.00

0.00

0.00

0.00

0.90

Muro de ladrillo

m2

1.3

2.5

3.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

3.4

2.5

8.50

2.00

0.90

0.00

0.00

0.00

0.00

1.80

Muro de ladrillo

m2

4.5

1.05

4.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

E`

Muro de ladrillo

m2

2.7

1.05

2.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.24

Vtotal

19.84

7.04

1.79

TABLA DE COMPUTOS METRICOS PARA MUROS SEG


MUROS DE MAMPOSTERIA EN EL EJE "Y"
EJE De: A:
A

A
B

DENOMINACION

Unidad N rep

Ventana 1

Ventana 2

Ventana 3

Vtotal

largo

ancho

alto

area

vol.

Lv

Hv

Lv

Hv

Lv

Hv

[m2]

2+

Muro de ladrillo

m2

4.2

2.25

9.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2+

Muro de ladrillo

m2

2.8

2.25

6.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2+

Muro de ladrillo

m2

0.6

2.25

1.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2+

Muro de ladrillo

m2

2.8

2.25

6.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

B+

Muro de ladrillo

m2

3.9

2.25

8.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

3.9

2.25

8.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

E`+ 2

Muro de ladrillo

m2

3.4

2.25

7.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.24

2.00

0.00

0.00

0.00

0.00

4.48

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Vtotal

4.48

Muro de ladrillo

m2

3.9

2.25

8.78

Muro de ladrillo

m2

3.2

2.25

7.20

2.24
MUROS DE MAMPOSTERIA EN EL EJE "X"
EJE De: A:
1

B E`+

Unidad N rep

Ventana 1

Ventana 2

Ventana 3

Vtotal

largo

ancho

alto

area

vol.

Lv

Hv

Lv

Hv

Lv

Hv

[m2]

Muro de ladrillo

m2

9.2

2.2

20.24

2.40

2.00

1.79

2.00

0.00

0.00

8.38

Muro de ladrillo

m2

4.8

2.2

10.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.2

4.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.1

2.2

4.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.1

2.2

4.62

1.50

0.60

0.00

0.00

0.00

0.00

0.90

D E`+

Muro de ladrillo

m2

2.5

2.2

5.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.2

4.40

2.00

0.60

0.00

0.00

0.00

0.00

1.20

0.00

Vtotal

10.48

2 E`+
2+

3 E`+

DENOMINACION

0.00

5.90

1.79

TABLA DE COMPUTOS METRICOS PARA MUROS A


MUROS DE MAMPOSTERIA EN EL EJE "Y"
EJE De: A:

DENOMINACION

Unidad N rep

Ventana 1

Ventana 2

Ventana 3

Vtotal

largo

ancho

alto

area

vol.

Lv

Hv

Lv

Hv

Lv

Hv

[m2]

Muro de ladrillo

m2

7.2

0.8

5.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

7.2

0.8

5.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.2

0.8

1.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.2

0.8

1.76

MUROS DE MAMPOSTERIA EN EL EJE "X"


EJE De: A:

DENOMINACION

Unidad N rep

0.00

0.00

Ventana 1

0.00

0.00

0.00

0.00

Ventana 2

Ventana 3

0.00

Vtotal

largo

ancho

alto

area

vol.

Lv

Hv

Lv

Hv

Lv

Hv

[m2]

Muro de ladrillo

m2

9.1

0.8

7.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

9.1

0.8

7.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.1

0.8

1.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

4.8

0.8

3.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Muro de ladrillo

m2

2.3

0.8

1.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ALBAILERIA
N

DENOMINACION

Unidad

Cantidad

Ventanas Planta Tipo

m2

5.11

Puertas Planta Tipo =

m2

5.38

Muros de Ladrillo =

m2

173.97

Cielos Falsos =

m2

0.00

Revoque Cielos =

m2

0.00

Revoque frotachado =

m2

40.25

Revoque con estuco =

m2

61.85

Pintura latex interior =

m2

61.85

Pintura al oleo =

m2

4.02

10

Revoque exterior =

m2

135.14

11

Pintura exterior =

m2

135.14

12

Contrapisos =

m2

0.00

13

Piso de porcelanato =

m2

0.00

14

Piso Cermica Nacional =

m2

29.33

15

Meson =

m2

2.75

16

Puertas de madera =

m2

5.38

17

Puerta de aluminio =

m2

0.00

18

Ventanas de Aluminio =

m2

0.00

19

Piso de parquetn =

m2

0.00

20

Revestimiento muros porcelanato =

m2

0.00

21

Revestimiento muros con cermica =

m2

40.25

22

Piso de Alfombra =

m2

0.00

23

Dinteles en puertas =

9.00

24

Botaguas de hormign armado =

55.40

ICOS PARA MUROS PLANTA LIBRE


Puerta 1

Puerta 2

Puerta 3

Ptotal Muro ladrilloPared int Revoque Pared int Revoque Pared ext Revoque

Lp

Hp

Lp

Hp

Lp

Hp

[m2]

6H m2

Rev Yeso

Yeso

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.96

5.96

0.00

5.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.88

8.88

8.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.50

0.00

13.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.50

0.00

2.50

2.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.50

0.00

6.50

6.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.75

9.75

0.00

9.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

32.00

0.00

0.00

32.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

0.00

0.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.40

13.40

0.00

0.00

Ptotal

0.00

100.48

[m2]

37.98

[m2]

30.88

[m2]

71.71

Puerta 1

Puerta 2

Puerta 3

Rev Frot.Frotachado Rev Cal

Ext Cal

[m2]

Ptotal Muro ladrilloPared int Revoque Pared int Revoque Pared ext Revoque

Lp

Hp

Lp

Hp

Lp

Hp

[m2]

6H m2

Rev Yeso

Yeso

Rev Frot.Frotachado Rev Cal

Ext Cal

0.90

2.15

0.00

0.00

0.00

0.00

1.94

3.82

3.82

0.00

3.82

0.80

2.15

0.00

0.00

0.00

0.00

1.72

2.53

0.00

2.53

2.53

0.80

2.15

0.00

0.00

0.00

0.00

1.72

1.53

0.00

1.53

1.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.25

4.25

0.00

4.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.25

3.25

3.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.75

5.75

0.00

5.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.06

0.00

2.06

2.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24.90

0.00

0.00

24.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18.60

0.00

0.00

18.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.80

6.80

0.00

0.00

Ptotal

5.38

73.49

[m2]

23.87

[m2]

9.37

[m2]

63.44

[m2]

COS PARA MUROS PRIMERA PLANTA


Puerta 1

Puerta 2

Puerta 3

Ptotal Muro ladrilloPared int Revoque Pared int Revoque Pared ext Revoque

Lp

Hp

Lp

Hp

Lp

Hp

[m2]

6H m2

Rev Yeso

Yeso

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.25

13.25

0.00

13.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.75

0.00

4.75

4.75

0.80

2.15

0.00

0.00

0.00

0.00

1.72

3.03

3.03

3.03

0.00

0.80

2.15

0.00

0.00

0.00

0.00

1.72

6.78

6.78

6.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.50

3.50

3.50

0.00

0.80

2.15

0.00

0.00

0.00

0.00

1.72

2.16

0.00

2.16

2.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.10

1.10

0.00

1.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17.00

0.00

0.00

17.00

Ptotal

5.16

51.57

[m2]

27.66

[m2]

20.22

[m2]

38.26

Puerta 1

Puerta 2

Puerta 3

Rev Frot.Frotachado Rev Cal

Ext Cal

[m2]

Ptotal Muro ladrilloPared int Revoque Pared int Revoque Pared ext Revoque

Lp

Hp

Lp

Hp

Lp

Hp

[m2]

6H m2

Rev Yeso

Yeso

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.86

5.86

Rev Frot.Frotachado Rev Cal


0

0.00

Ext Cal
5.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.63

3.63

3.63

0.00

0.80

2.15

0.00

0.00

0.00

0.00

1.72

3.28

3.28

3.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.25

5.25

5.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.35

0.00

4.35

4.35

1.10

2.15

0.00

0.00

0.00

0.00

2.37

0.89

0.89

0.00

0.89

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.70

0.00

6.70

6.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.73

0.00

0.00

9.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.84

0.00

0.00

5.67

Ptotal

4.09

37.51

[m2]

18.90

[m2]

23.21

[m2]

32.92

[m2]

OS PARA MUROS SEGUNDA PLANTA


Puerta 1

Puerta 2

Puerta 3

Ptotal Muro ladrilloPared int Revoque Pared int Revoque Pared ext Revoque

Lp

Hp

Lp

Hp

Lp

Hp

[m2]

6H m2

Rev Yeso

Yeso

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.45

9.45

0.00

9.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.30

0.00

6.30

6.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.35

2.70

0.00

0.00

0.80

2.15

0.00

0.00

0.00

0.00

1.72

4.58

4.58

4.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.78

17.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.78

17.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.65

7.65

7.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.30

4.30

0.00

4.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.20

0.00

7.20

7.20

Ptotal

1.72

58.38

[m2]

63.78

[m2]

25.73

[m2]

27.25

Puerta 1

Puerta 2

Puerta 3

Rev Frot.Frotachado Rev Cal

Ext Cal

Ptotal Muro ladrilloPared int Revoque Pared int Revoque Pared ext Revoque

Lp

Hp

Lp

Hp

Lp

Hp

[m2]

6H m2

Rev Yeso

2.93

2.20

0.00

0.00

0.00

0.00

6.45

5.41

5.41

0.00

5.41

0.80

2.15

0.80

2.15

0.90

2.15

5.38

5.19

10.37

0.00

0.00

0.80

2.15

0.00

0.00

0.00

0.00

1.72

2.68

2.68

2.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.62

4.62

4.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.72

0.00

3.72

3.72

2.45

2.20

0.00

0.00

0.00

0.00

5.39

0.11

0.11

0.00

0.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.20

0.00

3.20

3.20

Ptotal

18.93

24.93

[m2]

23.19

[m2]

14.22

[m2]

12.44

Yeso

Rev Frot.Frotachado Rev Cal

Ext Cal

RICOS PARA MUROS ANTEPECHO


Puerta 1

Puerta 2

Puerta 3

[m2]

Ptotal Muro ladrilloPared int Revoque Pared int Revoque Pared ext Revoque

Lp

Hp

Lp

Hp

Lp

Hp

[m2]

6H m2

Rev Yeso

Yeso

Rev Frot.Frotachado Rev Cal

Ext Cal

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.76

0.00

0.00

11.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.76

0.00

0.00

11.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.76

0.00

0.00

3.52

[m2]

0.00

0.00

Puerta 1

0.00

0.00

Puerta 2

0.00

0.00

0.00

1.76

0.00

0.00

3.52

Ptotal

0.00

15.04

[m2]

0.00

[m2]

0.00

[m2]

30.08

Puerta 3

[m2]

Ptotal Muro ladrilloPared int Revoque Pared int Revoque Pared ext Revoque

Lp

Hp

Lp

Hp

Lp

Hp

[m2]

6H m2

Rev Yeso

Yeso

Rev Frot.Frotachado Rev Cal

Ext Cal

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.28

0.00

0.00

14.56

0.00

0.00

0.80

0.00

0.00

0.00

0.00

7.28

0.00

0.00

14.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.68

0.00

0.00

3.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.84

0.00

0.00

7.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.84

0.00

0.00

3.68

Ptotal

0.00

21.92

[m2]

0.00

[m2]

0.00

[m2]

43.84

[m2]

pintura externa

192

Proyecto: CASA PRESA

Cliente:
Lugar:
Fecha:
Tipo de cambio: 6,96 Bs/$US

PRESUPUESTO CASA SEOR GOMEZ - IRPAVI II


Item

Descripcin

Unidad

Cantidad

OBRAS PRELIMINARES

1.1

INSTALACIN DE FAENAS, MOVILIZACIN Y DESMOVILIZACIN

Glb

1.00

1.2

REPLANTEO

m2

190.00

EXCAVACION (0-2 M.) TERRENO SEMIDURO

mb

47.83

EXCAVACION CON MAQUINARIA

m3b

16.80

2.2

RELLENO Y COMPACTACIN

mc

16.95

2.3

RELLENO Y COMPACTACION DE TIERRA (parte de ingreso afuera)

mc

8.16

2
2.1

MOVIMIENTO DE TIERRAS

OBRA GRUESA

3.1

CAPA DE HORMIGON POBRE (e=5cm)

m3

2.73

3.2

ZAPATAS DE HORMIGON ARMADO

m3

13.17

3.3

VIGAS DE ARRIOSTRE DE HORMIGON ARMADO (25X35)

m3

7.33

3.4

MACHONES DE HORMIGON ARMADO (ZAPATA - VIGA ARRIOSTRE)

m3

0.92

3.5

COLUMNAS DE HORMIGON ARMADO

m3

7.93

3.6

VIGAS DE HORMIGON ARMADO

m3

10.50

VIGA DE ENCADENADO DE HA

m3

2.52

3.7

LOSA DE HORMIGON ARMADO CON VIGUETAS PREFABRICADAS (e= 21cm)

m2

186.00

3.8

CONTRAPISO DE NIVELACION (e=4 cm)

m2

186.00

3.9

LOSA LLENA DE HA pte 2% (e=10 cm)

m3

0.67

3.10

ESCALERAS DE HA

m3

2.04

3.11

INSTALACION DE MEZON PARA COCINA

m2

2.50

3.12

AMPLIACION MURO DE CONTENCION ACTUAL

m3

1.94

3.13

CIMIENTO PERIMETRAL

m3

2.95

3.14

SOBRECIMIENTO PERIMETRAL

m3

2.02

3.15

CUBIERTA PUERTA DE GARAJE

m2

0.87

3.16

CUBIERTA INGRESO PRINCIPAL

m2

1.85

3.17

CUBIERTA DURALIT

m2

18.30

OBRA FINA

4.1

MURO LADRILLO 6 H (24X15X11) e=12 cm

383.30

4.3

EMPEDRADO Y CONTRAPISO (con malla 6c/30)

38.00

4.4

BOTAGUAS DE HORMIGN ARMADO

29.20

4.5

PROV. E INST. VENTANA DE MADERA

m2

47.31

4.6

PROV. E INST. PUERTAS DE MADERA

m2

35.27

4.7

PROV. E INST. PUERTA DE MADERA PARA GARAJE

Pza

1.00

4.8

PROV. E INST. PUERTA DE INGRESO PRINCIPAL

Pza

1.00

4.9

PROV. E INST. DE BARANDA METALICA h = 0.9 m

ml

29.23

4.10

PROV. E INST. BARANDA DE MADERA PARA GRADAS INTERIORES

ml

3.85

4.11

PROV. E INST. BARANDA PARA GRADAS EXTERIORES

ml

4.75

4.12

PROV. E INST. VIDRIO TRIPLE

m2

37.03

4.13

PROV. E INST. DE ARMARIO

Pza

4.00

4.14

REVOQUE INTERIOR DE YESO

195.37

4.15

REVOQUE INTERIOR FROTACHADO

123.62

4.16

REVESTIMIENTO DE PARED CON CERAMICA NACIONAL

123.62

4.17

PISO DE CERAMICA NACIONAL

74.71

4.18

REVOQUE EXTERIOR (CAL-CEMENTO-ARENA)

255.71

4.19

CIELO RASO

186.00

4.20

CIELO FALSO

m2

70.00

4.21

COLOCADO PISO DE PARQUET TAJIBO

103.71

4.22

PINTURA LATEX EXTERIOR

192.46

4.23

PINTURA INTERIOR LATEX

195.37

4.24

COLOCADO DE ZCALOS DE MADERA CEDRO

73.97

4.25

PISO DE CESPED SINTETICO

m2

0.00

4.26

LIMPIEZA GENERAL DE LA OBRA

Glb

1.00

INSTALACIONES HIDROSANITARIAS

5.1

AGUA POTABLE

5.1.1

INSTALACIN DE INODORO

Pza

4.00

5.1.2

INSTALACIN DE LAVAMANOS

Pza

4.00

5.1.3

INSTALACIN DE DUCHA

Pza

3.00

5.1.4

INSTALACIN DE TINA

Pza

0.00

5.1.5

INSTALACION DE LAVANDERIA

Pza

1.00

5.1.6

INSTALACION DE LAVAPLATOS

Pza

1.00

6.2

ALCANTARILLADO PLUVIAL Y SANITARIO

glb

INSTALACIONES ELCTRICAS

glb

Total presupuesto (Bolivianos):


Son:
Total presupuesto (Dlares Americanos):
Son:

96 Bs/$US

PU

Total
2,256.01

1,500.00

1,500.00

3.98

756.01
4,747.96

63.33

3,028.91

31.73

533.04

47.24

800.52

47.24

385.49
211,609.17

300.00

819.71

2,237.33

29,454.87

3,059.33

22,432.56

3,687.15

3,380.20

3,687.15

29,243.27

3,592.63

37,710.90

3,059.33

7,700.34

259.04

48,180.98

57.37

10,671.47

3,209.97

2,147.73

3,564.18

7,270.93

948.08

2,370.20

796.38

1,540.99

494.50

1,459.89

941.05

1,905.05

262.72

228.57

262.72

486.03

251.67

4,605.49
256,055.13

112.61

43,163.10

113.19

4,301.39

116.35

3,397.29

200.00

9,462.00

350.00

12,344.85

4,000.00

4,000.00

2,000.00

2,000.00

200.00

5,846.00

150.00

577.50

150.00

712.50

126.90

4,699.20

(%)

0.46%
0.30%
0.15%
0.96%
0.61%
0.11%
0.16%
0.08%
42.73%
0.17%
5.95%
4.53%
0.68%
5.91%
7.62%
1.55%
9.73%
2.15%
0.43%
1.47%
0.48%
0.31%
0.29%
0.38%
0.05%
0.10%
0.93%
51.71%
8.72%
0.87%
0.69%
1.91%
2.49%
0.81%
0.40%
1.18%
0.12%
0.14%
0.95%

2,500.00

10,000.00

62.15

12,141.71

126.80

15,674.26

175.36

21,677.56

199.49

14,904.57

117.44

30,030.54

76.30

14,192.27

200.00

14,000.00

173.67

18,012.11

27.17

5,229.98

25.05

4,893.53

51.30

3,794.77

333.78
1,000.00

1,000.00
15,549.07
10,549.07

683.58

2,734.33

845.50

3,382.01

1,076.40

3,229.20

1,000.00

562.80

562.80

640.72

640.72
5,000.00
5,000.00

495,217.34

71,151.92

2.02%
2.45%
3.17%
4.38%
3.01%
6.06%
2.87%
2.83%
3.64%
1.06%
0.99%
0.77%
0.00%
0.20%
3.14%
2.13%
0.55%
0.68%
0.65%
0.00%
0.11%
0.13%
1.01%
1.01%

100.00%
196.63 m2
361.864 $us /m2