PLAN DE MANEJO AMBIENTAL Y SOCIAL (PMAS) DE UN CAMBIO O PROYECTO Pag 1 de 4
A.-INFORMACIÓN GENERAL:
Nombre Cambio o Proyecto: CONSTRUCCIÓN – PLATAFORMA DE EMBARQUE Y DESEMBARQUE KM 52 Fecha Inicio Proyecto: 1/02/2023
Obras de envergadura:
- Plataformas de lixiviación, Tajos, Depósitos de Desmonte o Topsoil.
- Pozas de procesos,
- Plantas procesos, agua industrial, agua doméstica.
- Vías de acarreo.
- Presas, sedimentadores, serpentines.
- Estaciones nuevas de abastecimiento de combustible.
La zona de trabajo está ubicada a menos de 100 m. de zonas sensibles: humedales, quebradas, canales, sitios
arqueologicos, bofedales, manantiales u otros sitios declarados protegidos por la autoridad.
Requiere el cruce o trabajo en una quebrada o río importante (Río Rejo, Río Grande, Quebrada Honda, Azufre,
etc.), Instalación o modificación de estaciones de Aforo y mediciones en cauces y quebradas, o si puede disturbar
una laguna, manantial, humedal, sitio arqueologico.
Se requiera ejecutar trabajos a menos de 50m del límite de propiedad y que presente potencial conflicto social
(Opinión de Responsabilidad Social).
La zona de trabajo esta a menos de 50m, cruza o altera un camino comunal o propiedad de terceros (Opinión de
Responsabilidad Social).
Cuando se requieran ejecutar proyectos nuevos fuera de los límites de propiedad, como: calicatas para estudios
geotécnicos, estudios y/o uso de puntos de agua (superficial, subterránea), proyectos de exploración, explotación
de canteras, etc. (aplica a proyectos relacionados a la operación y no a proyectos de Responsabilidad Social)
QUIÉN
ITEM RR.SS COMPROMISOS O CONTROLES OPERACIONALES A IMPLEMENTAR (QUÉ) CUÁNDO
1
2
APROBACIÓN (NOTA: EL CIERRE SERÁ SÓLO CON COMUNICACIÓN ELECTRÓNICA AL ESPECIALISTA AMBIENTAL )
PUESTO NOMBRES Y APELLIDOS FIRMAS FECHA
Cursos naturales de agua (ríos, quebradas, humedales) No Aplica No hay cursos naturales de agua dentro de la zona de trabajo
Estructuras de derivación de agua (canales, pozas, etc) Canal de aguas e no contacto Se ubica cerca al área del proyecto
Volumen estimado de topsoil a remover (m3) 4000 m3 Dep San José / Noemi /Maqui Maqui
Volumen estimado de desmonte PAG (m3) No se estima generar material PAG De generarce material PAG, se dispondra en Backfil Carachugo /LQ
1.1.4 Documentos a anexar (al final del documento) por el área responsable
Comentarios Fecha (de ser si)
del proyecto o cambio:
Ingenieria del Proyecto - Se tuvo revision Multifuncional de planos ? Participación de las direrentes área, Especialmente Procesos Si
Visita de campo Se realizó según bases del concurso, el día 16 mayo del 2022 Si
Plano General del proyecto con coordenadas UTM PSAD 56 (físico y digital DXF,
Se adjunta Si
GIS o CAD)
Plano(s) de Sistema de Drenaje, Control de Erosión y Sedimentos. Sólo para obras con movimientos de tierras Si
Plano(s) de Rehabilitaciones finales o progresivas Sólo para obras con movimientos de tierras NA
Plan de Control de Polvo y puntos de abastecimiento agua Se tendrá el apoyo de la cisterna de riego de Mantenimiento de Vías. Si
CODIGO: YAN-ENV-FOR-
FORMATO
1932
Ver 11 Septiembre 2020
PLAN DE MANEJO AMBIENTAL Y SOCIAL (PMAS) DE UN CAMBIO O PROYECTO
Pag 1 de 4
CONSTRUCCIÓN – PLATAFORMA DE
NOMBRE DEL PROYECTO: EMBARQUE Y DESEMBARQUE KM 52 Código del PMAS:
09-feb.-23 14-feb.-23
CIERRE:
NIVEL II
NIVEL III (NOTA: DEBERÁ CONSIDERAR PREVIAMENTE EL CIERRE POR EL NIVEL II):
TRANSFERENCIA:
Gerente / Superintendente que transfiere el Proyecto Gerente / Superintendente que recibe el Proyecto
(Nota.-si es la misma Gerencia, no aplica este casillero)
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
YANACOCHA SULFUROS
MINERA YANACOCHA
Rev. A
EMITIDO PARA PERMISOS
Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to electronic documents in MM Yanacocha on Aconex for current revisions.
Confidential. © 2023 Bechtel Perú S.R.L. This document prepared under Contract 26280 between Bechtel Perú S.R.L. and Minera Yanacocha S.R.L.,
contains information confidential and/or proprietary to Bechtel that is not to be used, disclosed, or reproduced in any form by any person or entity other
than Bechtel or Minera Yanacocha S.R.L. without Bechtel’s prior written permission. All rights reserved.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
TABLA DE CONTENIDO
SECCION 1: RESUMEN EJECUTIVO 3
1. INTRODUCCIÓN 3
2. JUSTIFICACIÓN 4
2.1. JUSTIFICACIÓN DE PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE PERSONAL Y LÍNEA DE
TUBERÍA PARA DRENAJE DE AGUAS CONTACTADAS 4
3. DESCRIPCIÓN GENERAL 5
3.1. DESCRIPCIÓN DE PLATAFORMA PARA EL EMBARQUE Y DESEMBARQUE DE PERSONAL Y LÍNEA
DE TUBERÍA PARA TRANSPORTE DE AGUA CONTACTADA HACIA POZA SUR 5
3.1.1. Plataforma de Embarque y Desembarque de Personal 5
SECCIÓN 2: DESCRIPCIÓN DE LA ETAPA DE CONSTRUCCIÓN DE PLATAFORMA DE EMBARQUE Y
DESEMBARQUE DE PERSONAL Y LÍNEA DE TUBERÍA PARA DRENAJE DE AGUAS CONTACTADAS
¡ERROR! MARCADOR NO DEFINIDO.
4. DESCRIPCIÓN DE LAS ACTIVIDADES DE LA CONSTRUCCIÓN 5
4.1. TRAZO Y REPLANTEO 6
4.2. EJECUCIÓN DE MOVIMIENTO DE TIERRAS 6
4.2.1. Excavación, Carguío y Transporte de Top Soil a Botadero 6
4.2.2. Excavación y Relleno Compensado de Plataforma 6
4.3. CONSTRUCCIÓN DE CUNETAS 6
4.4. CONSTRUCCIÓN DE BUZONES 8
4.5. INSTALACIÓN DE ILUMINACIÓN PARA PLATAFORMA DE EMBARQUE Y DESEMBARQUE 9
4.6. INSTALACIÓN DE ATERRAMIENTO Y PARARRAYOS 9
4.7. INSTALACIÓN DE SEÑALIZACIÓN VERTICAL Y HORIZONTAL 10
5. VOLÚMENES DE TRABAJO 11
5.1. PLATAFORMA DE EMBARQUE Y DESEMBARQUE 11
6. LISTADO Y CANTIDADES DE EQUIPOS 11
6.1. EQUIPOS DE CONSTRUCCIÓN 11
6.2. VEHÍCULOS Y MAQUINARIA DE APOYO 12
7. CARACTERÍSTICAS DEL DISEÑO 13
7.1. PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE PERSONAL 13
8. CRONOGRAMA DE LAS ACTIVIDADES DE CONSTRUCCIÓN 14
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 2 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
1. INTRODUCCIÓN
El proyecto Sulfuros Yanacocha tiene como objetivo producir de manera rentable y sostenible oro y cobre
a partir de los depósitos de sulfuro dentro de la actual Minera Yanacocha S.R.L (MYSRL). Su desarrollo se
sumará a la producción y extenderá la vida útil económica de Minera Yanacocha S.R.L. (MYSRL) mediante
el procesamiento eficiente y económico de minerales de sulfuro de metal de alta calidad de los depósitos
subterráneos de Yanacocha Verde y Chaquicocha.
Como parte del proyecto se tiene planificado utilizar el Campamento del Km 52 para albergar al personal
que ejecutará el proyecto Yanacocha Sulfides; aproximadamente 4,000 personas adicionales a las 1,100
personas que hoy alberga el campamento Km 52.
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 3 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
2. JUSTIFICACIÓN
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 4 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
3. DESCRIPCIÓN GENERAL
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 6 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
Las cunetas se construirán en concreto armado, para lo cual se ejecutarán las siguientes actividades:
1) Excavación para cunetas, 2) Encofrado de cunetas, 3) Colocación de acero de refuerzo, 3) Vaciado
de cunetas, y 4) Relleno lateral de cunetas.
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 7 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
Los buzones se construirán en concreto armado, el agua contactada será conducida con tubería
HDPE. Las principales actividades por ejecutar para la construcción de los buzones son:
Excavación localizada para buzon y tubería entre buzones
Solado para buzones
Construcción de buzones y tendido de tubería HDPE (incluye encofrado, acero de refuerzo y
vaciado de concreto)
Relleno lateral de buzones
Relleno de tubería HDPE
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 8 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 9 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 10 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
5. VOLÚMENES DE TRABAJO
Las principales cantidades de trabajo a ejecutar son:
Cantidad
Disciplina Actividad Equipos
Estimada
Estación Total 1
Topografía Trazo y replanteo
Nivel 1
Retiro de Top Soil Excavadora 2
Excavadora 2
Obras Civiles Excavación de material suelto y Tractor D6 1
relleno Motoniveladora 1
Cisterna de Agua 2500 gln 1
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 11 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
Cantidad
Disciplina Actividad Equipos
Estimada
Rodillo 1
Relleno con gravilla Minicargador 1
Instalación de Sendero Peatonal
Techado
Construcción de buzones
Camión Grúa de 15 Ton 1
Instalación de tubería para buzones
Señalización (bolardos)
Señalización (letreros)
Instalación de cable eléctrico
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 12 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 13 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
Electronic documents, once printed, are uncontrolled and may become outdated. Refer to electronic documents in MM Yanacocha on Aconex for
current revisions. Confidential. © 2023 Bechtel Perú S.R.L. All rights reserved.
Page 14 of 14
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
SISTEMA INTEGRADO DE GESTIÓN CÓDIGO:
REVISIÓN:
FO-HSE-INVRO-017
02/01/2023
PARQUEO DE MINIBUS Y
CAMIONETAS
ACOPIO DE
ALMACEN Y
RESIDUOS
OFICINAS
SSHH
REFUGIO
PERMANENTE
AREA DE TRABAJO
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
1 2 3 4 5 6 7 8 9 10
N
19
N
N
N
250
225
50
75
200
175
125
100
E
0
4037.5
29
29
29
29
29
29
29
19
INGRESO 325
NO E
R
A REA TE DE BUSES A
L 0
1.3
4 .8
CERCO PERIMETRAL TIPO
7
INDUSTRIAL (VER PLANO
0 26280-320-C0-7110-01001)
1.8
0
6.3
CAMINO E
XISTENTE SALIDA
123.18 PORTON ESTANDAR (VER PLANO
DE BUSES
0
2.5 26280-320-C0-7110-01001)
8.00
CAMINO EXISTENTE
0
3.5
PORTON ESTANDAR (VER PLANO
LOSETA (VER PLANO
26280-320-C0-7110-01001)
26280-320-CE-7140-10004)
5
1 .3
CASETA DE VIGILANCIA
(VER PLANO PASILLO PEATONES
26280-320-DB-7140-10005) 1.3
0 1.3
0
12
.22
6
2.8
B 19
300
B
6.3 E
0
.00 ZONA DE
37.28
8 EMBARQ
UE 1
3.00
PLATAFORMA DE
DESCARGA DE LAGUNA EMBARQUE DE BUSES
EXISTENTE (VER PLANO
26280-320-CE-7140-10004)
.00
4042.5
R8
LOSETA (VER PLANO
PASILLO PEATONES
26280-320-CE-7140-10004)
34
19.
TUBERIA HDPE
EXISTENTE
3.00
ZONA DE EMBARQUE 2
CERCO PERIMETRAL
C 19
200
(VER PLANO C
E 26280-320-PI-7140-10002)
ESCALERA 3 ZONA DE
19
EMBARQUE (VER PLANO 275
26280-320-DB-7140-10001) E
CANAL DRENAJE DE AGUAS 4042.5
16.74
20.90
26280-320-DB-7140-10001) EMBARQUE (VER PLANO
4045.0 26280-320-DB-7140-10001)
PUERTA DE ACCESO 4045.0
PEATONAL (VER PLANO
26280-320-C0-7110-01001)
4047.5
4047.5
PUERTA DE ACCESO
PEATONAL (VER PLANO
26280-320-C0-7110-01001)
HACIA CAMPAMENTO
DE TRABAJADORES
PUERTA DE ACCESO
N
N
N
N
N
N
PEATONAL (VER PLANO
125
200
100
150
175
19
075
050
19 19 250
200 225 26280-320-C0-7110-01001) E
29
29
29
29
29
29
29
D D
0 2.5 5 7.5 10 12.5
PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES - CALZADAS Y PASILLOS 1 : 250
ESC.1:250
information confidential and/or proprietary to Bechtel that is not to be used, disclosed, or reproduced in any form by any person or entity other than Bechtel or Yanacocha
Confidential. © 2020 Bechtel Chile Ltda. This document, prepared under Contract 26280 between Bechtel Chile Ltda. (Bechtel) and Yanacocha, contains
CAMP. KM 45
LEYENDA
E PARARRAYOS (NOTA 4) E
CDL
LUMINARIA ALUMBRADO PUBLICO
(NOTA 4)
LUMINARIA CON PARARRAYO ESTE PLANO
(NOTA 4)
CAMP. KM 52
CERCO METALICO PROYECTADO
LOCALIZACION
ESC.:1/50,000
BECHTEL
ENG. MANAGER: BY:C. MARTINEZ BY: M. TORRES 08-SEPT-22 TITLE:
PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES - DRENAJES DE AGUAS 26280-320-CE-7140-10004 4. UBICACION DE LUMINARIAS Y PARARRAYOS REFERENCIAL, VER PLANO 26280-320-EG-7140-01001 CHECKED
J.C. NAVARRO
BY:
EGS:
R. VALLEDOR 08-SEPT-22
PLATAFORMA EMBARQUE Y DESEMBARQUE DE BUSES KM 52
PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES MOVIMIENTOS DE TIERRA PERFILES 26280-320-CE-7140-10003 Y PLANO 26280-320-EL-7140-01001 PROJ. MANAGER:
P.ENG/A.MGR: A. BRITO LAYOUT
0 08-SEPT-22 EMITIDO PARA CONSTRUCCION M.T. JC.P. R.V/A.B M.E. PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES MOVIMIENTO DE TIERRA SECCIONES 26280-320-CE-7140-10002 5. PARA DETALLE DE TECHUMBRE VER PLANOS 26280-320-SS-7140-10001, 10002 Y 10003.
ENG. MANAGER: M. ESPINOSA . PLANTA GENERAL
A 03-AGO-22 EMITIDO PARA REVISION A.V. JC.N. R.V/A.B M.E. PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES MOVIMIENTOS DE TIERRA PLANTA GENERAL 26280-320-CE-7140-10001 DRAWING Nº: REV.
Rev. DATE REVISION BY CHK. EGS PE/PEM REFERENCE DOCUMENTS NUMBER NOTES
Job No. 26280 26280-320-P1-7140-10001 0
No.
This document has been prepared by Bechtel Chile Ltda. (Bechtel), exclusively for Yanacocha under Contract 26280 and is not to be relied upon by any person or entity other than Yanacocha or used in conjunction with any other project.
DATE: TIME: USER:
1 2 3 4 5 6 7 8 FILE: 9 10
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
MEMORIA DESCRITPTIVA
MEMORIA DESCRIPTIVA
NOMBRE
253 CC Plataforma de Embarque y Desembarque
PROYECTO:
CODIGO DE
26280-220-HC3-VA30-00253
CONTRATO:
ÁREA: CONSTRUCCION
ESPECIALIDAD: SEGURIDAD
26280-220-HC3-VA30-00253
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 1 de 8
1. CONTRATISTA
Inversiones Rohuay SRL.
5. GERENCIA
Proyectos
6. SPONSOR
Mario Adrianzen
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 2 de 8
8. ORGANIGRAMA
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 3 de 8
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 4 de 8
EQUIPOS
14. ANEXOS
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 5 de 8
UBICACIÓN DEL
PROYECTO
BACK FILL
CARACHUGO
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 6 de 8
Garita Huandoy
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 7 de 8
Garita Huandoy
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 8 de 8
M. ESPINOSA
07-JUN-2022
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
M. ESPINOSA
26280-320-EL-7140-01001
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
1 2 3 4 5 6 7 8 9 10
19
5N
0N
5N
0N
5N
0N
5N
19 27
25 5E
22
20
17
15
12
10
07
0E 19
30
29
403 0E
29
29
29
29
29
29
7.
5 19
32
5E
INICIO CANAL DE
A CAMINO EXISTENTE A
N 29196.60
E 19253.26
000
005
010
INICIO CANAL DE
015
020
025
030
035
N 29208.19 0.00 A
040
045
050
E 19247.77
055
060
ENTE
065
DESCARGADEL ST
AGUNAEXI CAMINO EXISTENTE
070
PI
075
A CANAL DE CONCRETO N°1
080
129.097
085
005 FIN CANAL DE
090
INICIO CANAL DE N 29073.96
095
100
E 19293.59
105
110
000
INICIO CANAL DE TIERRA 2
005
115
N 29187.07
010
120
B
015
E 19246.79 CON REJA CAMI N 29071.87
020
NO I
125
NTE
025
010 RI
OR - E 19293.08
1
030
035
000
FIN CANAL DE TIERRA 2
040
FIN CANAL DE
0
19
005
13
00
045
22
010
050
5E CON REJA
015
N 29064.39
0
055
PI
020
060
025
N 29098.80 E 19290.74
065
030
106.192 19 B
070
B
035
015 30
075
EMBAR E 19275.26
040
INICIO CANAL DE 0E
080
5
QUEPE N 29086.11
045
00
AT DESCARGA A OBRA
085
ONAL-
050
1 096.300
090
G
055
5N
E 19279.71
095
EXISTENTE
060
100
N 29185.88
065
105
22
070
FIN CANAL DE TIERRA 1
075
E 19243.13
080
29
085
020 02 N 29063.36
0
090
CON REJA 95 0
PI E 19289.72
E
116.222
10 N 29072.95
PI 1 01
E 19273.23 5
025 092.750 FIN CANAL DE CAJON DE CONCRETO N°2
G
CON REJA CAMI
NO I
NTERI
OR-2 N 29097.70
N 29069.650
C E 19271.89 C´
5
5 10
2.
11
INICIO CANAL DE E 19271.75
404
00-
110
005
010
015
020
025
030
035
040
045
050
055
060
065
070
075
080
085
090
095
100
105
115
030
DET 2
0
N 29179.13
00 7140-10005
E 19225.96 EMBARQUEPEATONAL- 117.572 5
2
040
045
050
055
060
065
070
075
080
085
090
095
100
105
110
115
120
125
130
135
140
145
150
155
160
165
170
DUCTO HDPE EXISTENTE
A REUBICAR 035
PI
171.
PI 002.730
FIN CANAL DE
CON REJA N 29066.22
35.544 FIN CANAL DE
C 19 C
00
20 E 19272.37
0E N 29193.64 N 29078.62
E 19215.34 N 29069.89 INICIO CANAL DE TIERRA 1
E 19271.14 19
E 19270.43 N 29068.62 27
5E
4042.
5 CAJON DE CONCRETO N°1 E 19271.03 4042.
5
DET 1
4045.0 7140-10005
4045.
0
4047.
5
4047.
5
0N
5N
0N
5N
0N
5N
0N
20
17
15
12
10
07
05
19 19 19
20 22 25
29
29
29
29
29
29
29
0E 5E 0E
50
PLATAFORMA PROYECTADA COMPACTADO CANALETA DE CONCRETO N°1 117 -
65
0.
26280-320-DG-7140-10002 0.70 3.00 0.10 0.80
0.
i=2.0% CANALETA DE CONCRETO N°2 39 -
L
PASILO PEATONAL1DECONCRETO
CAMINO INTERIOR - 1
1 CANALETA DE CONCRETO N°3 38 -
CARPETA DE RODADO SOLADO e=5cm
30
15
31 -
45
0.
e=30 cm
0.
RASANTE
0.
50
0.15 0.15 CANAL
50
TERRENO NATURAL
15
65
0.
65
0.
0.
15
0.
0.
0.
15
SECCION G
15
0.
0.60 CAJON DE CONCRETO N°2 4 2
0.
RASANTE
)and Yanacocha,cont
CANAL
ESC. 1:10 ESC. 1:10
iy ot
t
TERRENO NATURAL
son orent
CAMINO INTERIOR - 1
CARPETA DE RODADO DETALLESDETAPAS,RECESOSyARMADURAS
by any per
el
26280-320-DG-7140-10002
0.05 1.33 0.26 1.83 VAR.0.55 - 067
e Lt
L
PASILO PEATONAL2DECONCRETO CDL
i=2.0% 1 1 1
ween Becht
1 1 1
oduced i
50
50
ESTE PLANO
50
0.
0.
60
15
65
0.
75
epr
0.
1.2 1.2
0.
1.2 1.2
act26280 bet
CAMP. KM 52
0.
0.
RELLENO MASIVO
osed,or r
1 1 1 1
CANAL DE CONCRETO COMPACTADO
CON REJA N°2 RASANTE RASANTE
scl
15
ed underCont
o be used,di
0.40 CANAL
0.15 RASANTE
SECCION SECCION D SECCION E
SOLADO e=5cm 0.50 (SECCION C´) C CANAL 0.15 0.50 0.15 SOLADO e=5cm
ESC. 1:10 ESC. 1:10
LQ WEST
LQ CHAQUICOCHA
s nott
epar
ESC. 1:10
0.80
ved.
0.70
,pr
hati
x 594 mm
yt
3.- TODOS LOS DATOS PARA EL REPLANTEO DEBERAN SER APROBADOS POR EL INGENIERO
opr
F
l
en per
elChi
orpr
PROJECT:
DE CAMPO ANTES DE LA CONSTRUCCION. SI LA TOPOGRAFIA DEL TERRENO DIFIERE DE LA MOSTRADA YANACOCHA APPROVAL DATE SCALE DATE YANACOCHA SULFIDES PROJECT
dgn -841 mm
YANACOCHA
CANALES, CAMARAS Y PASILLOSDE CONCRETO-ARMADURAS 26280-320-DG-7140-10002
aland/
BECHTEL
.© 2022 Becht
DESIGNED DRAWN
t
EN LOS PLANOS, EL INGENIERO DE CAMPO COORDINARA LA APROBACION DEL AJUSTES AL DISEÑO CON
t
TITLE:
i
ENG. MANAGER:
CANALES, CAMARAS Y PASILLOSDE CONCRETO-FORMAS 26280-320-DB-7140-10004
INGENIERIA. CHECKED EGS: PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES Km 52
i
dent
R. VALLEDOR 22-08-2022
i
BY: J. NAVARRO
s pr
PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES - LAYOUT 26280-320-P1-7140-10001 4.- TODO MATERIAL INADECUADO ENCONTRADO DURANTE LA CONSTRUCCION DEBERA SER REMOVIDO, PROJ. MANAGER: P. ENG/A.MGR: DRENAJE SUPERFICIAL
YANA.
i
on conf
A. BRITO
el’
PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES - PERFILES 26280-320-CE-7140-10003 SEGUN SEA DETERMINADO POR EL INGENIERO DE CAMPO.
houtBecht
ENG. MANAGER:
PLANTA GENERAL
al
26280_A1-
M. ESPINOSA
i
dent
Rev.
00A
t
No.
i
This document has been prepared by Bechtel Chile Ltda. (Bechtel), exclusively for Yanacocha under Contract 26280 and is not to be relied upon by any person or entity other than Yanacocha or used in conjunction with any other project.
DATE: $DATE$ TIME: $TIME$ USER: $USERNAME$
1 2 3 4 5 6 7 8 FILE: $FILE$ 9 10
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
1 2 3 4 5 6 7 8 9 10
TERRENO NATURAL
00
85
4045
000.
12
408
4040.
PLATAFORMA PROYECTADA
052.
4040.
.
KM
El
.
KM
El
L=52.12m
14
i=-1.00% CAJON DE HORMIGON
20
171.
4040
4036.
L
=119.03
m
A A
.
KM
El
RASANTE CANALETA i
= -
3.6
2% CANAL DE TIERRA 1
4034
REF.
4035
31
51
61
22
42
52
37
34
27
87
97
24
97
07
46
06
45
49
43
40
18
05
69
33
15
78
60
88
70
33
15
79
43
25
88
55 4041.
76 4040.
86 4037.
47 4041.
67 4039.
77 4038.
64 4041.
59 4041.
514041.
12 4040.
22 4039.
49 4039.
22 4037.
32 4037.
76 4041.
314039.
85 4041.
814041.
724041.
68 4041.
43 4041.
30 4041.
94 4040.
58 4040.
40 4040.
03 4039.
85 4039.
13 4038.
95 4038.
58 4038.
40 4038.
04 4037.
68 4037.
50 4037.
13 4036.
ELEVACION TERRENO
5 4040.
40 4040.
110 4038.
15 4040.
60 4040.
85 4039.
140 4037.
165 4036.
25 4040.
45 4040.
65 4039.
100 4038.
125 4037.
145 4037.
10 4040.
70 4039.
150 4036.
0 4040.
20 4040.
30 4040.
35 4040.
50 4040.
55 4040.
75 4039.
80 4039.
90 4039.
95 4038.
105 4038.
115 4038.
120 4037.
130 4037.
135 4037.
155 4036.
160 4036.
170 4036.
RASANTE CANALETA
175
DISTANCIA ACUMULADA
PERFLL
I T
ONGI GONCONREJ
NALCANALDEHORMI
UDI 1
AN° TERRENO NATURAL
4045 4045
ESC. 1:250
TERRENO NATURAL
00
TERRENO NATURAL PLATAFORMA PROYECTADA
4045 44
KM 000.
4040.
RASANTE CANALETA PLATAFORMA PROYECTADA
PLATAFORMA PROYECTADA
00
00
CANAL DE HORMIGON N°4
KM 0+000.
84
KM 000.
.
83
63
630
El
69
DESCARGA A CANAL HORMIGON N°2 4040 4040
4035.
56
KM 007.
KM 020.
4035.
4035.
4035.
44
98
25
KM 115.
16
RASANTE CANALETA
KM 119.
4036.
.
El
4036.
4040
.
El
.
.
El
El
L
=115.44
m 4034 4034
.
L=2 0.63
m
El
L=7.83m
.
El
i
= -
3.6
3% REF. REF.
i=-1.03% i=-1.66%
RASANTE CANALETA 4035 4035
4034 L=4
B .
54m B
39
28
22
36
80
63
50
REF. i
=-
2.0
8%
694036.
614036.
634036.
694036.
844036.
794036.
744036.
4035
CAJON DE HORMIGON ELEVACION TERRENO ELEVACION TERRENO
91
01
82
92
54
64
64
37
36
46
46
09
19
73
18
00
28
09
73
55
19
83
28
10
264038.
364038.
174039.
274036.
894040.
994039.
994037.
724038.
714040.
814039.
814037.
444041.
264041.
084040.
534040.
354040.
634039.
444039.
084038.
904038.
544038.
184037.
634037.
454037.
5 4035.
0 4035.
0 4035.
10 4035.
5 4035.
15 4035.
20 4035.
ELEVACION TERRENO
RASANTE CANALETA RASANTE CANALETA
20 4039.
45 4038.
100 4036.
75 4037.
0 4040.
55 4038.
80 4037.
35 4039.
115 4036.
5 4040.
60 4038.
85 4037.
10 4040.
15 4039.
25 4039.
30 4039.
40 4038.
50 4038.
65 4038.
70 4037.
90 4037.
95 4036.
105 4036.
110 4036.
RASANTE CANALETA DISTANCIA ACUMULADA DISTANCIA ACUMULADA
75
99
30
4042
94
TERRENO NATURAL 26280-320-DG-7140-10002
KM 92.
4036.
KM 96.
4036.
PLATAFORMA PROYECTADA
0.23 0.57 1.00 0.57 0.23
4040
.
1.2
.
CANAL DE TIERRA 2
El
El
00
L=9
2.75m
24
KM 000.
i
=-
4040.
3.51
% 1
RELLENO
70
RASANTE CANALETA
4034
0.
COMPACTADO
20
L=3.55m 0.
.
El
20
0.
REF. i=-1.26% i
=1 1
50
4035 .
76
1.
1
20
%
60
21
61
12
82
62
32
12
07
87
56
85
09
10
99
43
25
13
00
80
20
0.
0.
07 4040.
43 4038.
244040.
844039.
614038.
264038.
964038.
374040.
014039.
664039.
894039.
724040.
544040.
194039.
494039.
314039.
144039.
964039.
794038.
084038.
2. EL. 4035.63
1. 0
ELEVACION TERRENO 60
8
1.
C C
40
20
2.
0.
35 4039. 20
55 4038.
75 4037.
15 4039.
0 4040.
20 4039.
40 4038.
60 4038.
5 4040.
25 4039.
45 4038.
65 4037.
85 4037.
95 4036.
10 4039.
30 4039.
50 4038.
70 4037.
80 4037.
90 4037.
RASANTE CANALETA 2.20 CAJON DE
PROTECCION DE TALUD 0.20 0.20
HORMIGON N°2
CON RIP-RAP CONSOLIDADO 2.60
100
DISTANCIA ACUMULADA e=20cm DETALLES ARMADURAS
20
ELEV. 4035.56 0.
0.
20 VER PLANO N°
SECCION F
PERFLL
I T
ONGI NALCANALDEHORMI
UDI 3
AN°
GONCONREJ 1.
50 ESC.
26280-320-DG-7140-10002
ELEV. 4035.63
ESC. 1:250 DESCARGA A CANAL HORMIGON N°2
PLATAFORMA PROYECTADA
4045 G
CAMINO INTERIOR 2
0.15 0.50 0.50 0.50 0.15
1.2
49
57
57
44
KM 104.
KM 117.
PLATAFORMA PROYECTADA 1
4036.
4036.
TERRENO NATURAL RELLENO
60
0.
4040 CANAL DE COMPACTADO
.
1
.
El
El
L
=106.20
m TIERRA 1
50
1
1.
i
= -
3.4
7%
70
62
0.
1.
.
4034
55
RASANTE CANALETA EL. 4035.56
=1
L=13.08m
i
REF. CAJON DE HORMIGON N°2
20
4035 i=-1.0% 1.
0.
00
64
24
57
57
97
16
20
60
53
73
73
73
69
58
38
00
79
99
80
00
00
09
99
00
CAJON DE HORMIGON N°2
684039.
464039.
774038.
594038.
254037.
294039.
204040.
024039.
854039.
504039.
334039.
164039.
984039.
814039.
634039.
114039.
944038.
424037.
074037.
904038.
734038.
574038.
524038.
474039.
DETALLES ARMADURAS
0.20 1.40 0.20
ELEVACION TERRENO PROTECCION DE TALUD VER PLANO N°
CON RIP-RAP e=20cm 1.80
26280-320-DG-7140-10002
D D
DET 2
40 4038.
60 4038.
110 4036.
5 4040.
80 4037.
65 4037.
70 4037.
90 4037.
105 4036.
30 4039.
50 4038.
115 4036.
0 4040.
10 4039.
15 4039.
20 4039.
25 4039.
35 4038.
45 4038.
55 4038.
75 4037.
85 4037.
95 4036.
100 4036.
RASANTE CANALETA
7140-10004 SECCION G
ESC.
DISTANCIA ACUMULADA
CANAL DE HORMIGON N°2
CON REJA
PERFLL
I T
ONGI NALCANALDEHORMI
UDI 4
AN°
GONCONREJ 15
0.
i
00
=-
4045 26280-320-DG-7140-10002 15
00
0.
2.
CANAL DE
KM 000.
08
4040.
TIERRA 1
%
elorYanacocha
12
45
95
KM 120.
KM 0+085.
CANAL DE TIERRA 2
.
4035.
El
32
20
4037.
49
0.
25
78
KM 129.
73
KM 131.
.
El
4035.
4040
4035.
J
.
El
L
=85.4
5m
han Becht
i
=-3
.1
.
3%
El
.
El
ains
L
=34.6
7m ELEV.
4034
)and Yanacocha,cont
i
=-3
.97% L=9.37m 4036.16
hert
15
REF.
i=1.8%
0.
L=1
.76m
4035
y ot
i
=-
2.74
%
1.
81
11
81
2%
92
22
52
57
04
87
34
17
64
47
46
66
98
80
63
45
28
10
75
40
69
99
29
93
6
.
00
=
i1
i
son orentt
14 4037.
35 4037.
86 4036.
064039.
434039.
814038.
754039.
284039.
124038.
654038.
494038.
944037.
764036.
754037.
954036.
004040.
844040.
694040.
534040.
374040.
224040.
904039.
594039.
964038.
344037.
554037.
154036.
50
00
60
i=3.60%
0.
3.
2.
ELEVACION TERRENO ELEV.
4035.84
CANAL DE HORMIGON N°1
70 4037.
25 4039.
60 4038.
5 4039.
20 4039.
85 4037.
90 4037.
95 4036.
125 4035.
30 4039.
65 4037.
130 4035.
15
0 4040.
10 4039.
15 4039.
35 4038.
40 4038.
45 4038.
50 4038.
55 4038.
75 4037.
80 4037.
100 4036.
105 4036.
110 4036.
115 4036.
120 4035.
by any per
el
0.
Becht
CAJON DE 4036.24
DISTANCIA ACUMULADA HORMIGON N°1
e Lt
orm
.
150 PROTECCION DE TALUD
l
elChi
n any f
3.00
PERFLL
I T
ONGI GONCONREJ
NALCANALDEHORMI
UDI 5
AN° CON RIP-RAP CONSOLIDADO
20
PLATAFORMA PROYECTADA PLATAFORMA PROYECTADA
0.17 0.83 1.00 0.83 0.17 e=20cm
0.
ween Becht
RELLENO
60
epr
RELLENO
0.
act26280 bet
0.
COMPACTADO COMPACTADO
osed,or r
00
I
20
20
1.
RELLENO 1 EL. 4035.84
40
40
1.
1.
1 1 COMPACTADO
1.
1.
1
1 1
90
80
scl
0.
20
r
1 EL. 4036.24
ed underCont
o be used,di
0.
VER PLANO N°
DET 1
20
20
1
0.
0.
26280-320-DG-7140-10002
20
7140-10004
0.
0.20 1.40 0.20 CAJON DE HORMIGON N°1 CAJON DE HORMIGON N°1
SECCION J SECCION I SECCION H 0.20 2.60 0.20 CAJON DE HORMIGON N°1
s nott
epar
on.Al
x 594 mm
yt
F
l
en per
elChi
orpr
PROJECT:
YANACOCHA APPROVAL DATE SCALE INDICATED DATE YANACOCHA SULFIDES PROJECT
dgn -841 mm
YANACOCHA
aland/
BECHTEL
.© 2022 Becht
DESIGNED DRAWN
tt
TITLE:
i
ENG. MANAGER:
CHECKED EGS: PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES Km 52
i
dent
R. VALLEDOR 22-08-2022
i
BY: J. NAVARRO
s pr
PLATAFORMA DE EMBARQUE Y DESEMBARQUE DE BUSES - LAYOUT 26280-320-P1-7140-10001 PROJ. MANAGER: P. ENG/A.MGR: DRENAJE SUPERFICIAL
YANA.
i
on conf
A. BRITO
el’
ENG. MANAGER:
PERFILES LONGIRUDINALES SECCIONES Y DETALLES
al
26280_A1-
M. ESPINOSA
i
dent
i
Rev.
00A
t
No.
i
This document has been prepared by Bechtel Chile Ltda. (Bechtel), exclusively for Yanacocha under Contract 26280 and is not to be relied upon by any person or entity other than Yanacocha or used in conjunction with any other project.
DATE: $DATE$ TIME: $TIME$ USER: $USERNAME$
1 2 3 4 5 6 7 8 FILE: $FILE$ 9 10
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
NOMBRE
253 CC Plataforma de Embarque y Desembarque
PROYECTO:
CODIGO DE
26280-220-HC3-VA30-00253
CONTRATO:
ÁREA: CONSTRUCCION
ESPECIALIDAD: SEGURIDAD
26280-220-HC3-VA30-00253
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
PLAN DE CONTROL DE POLVO VERSIÓN: 01
PÁGINA: 1 de 8
1. INTRODUCCIÓN
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
PLAN DE CONTROL DE POLVO VERSIÓN: 01
PÁGINA: 2 de 8
2. ALCANCE
El presente plan aplica a todos los empleados de la empresa INVERSIONES
ROHUAY SRL.
3. OBJETIVO
Objetivo General:
• Evitar o disminuir la generación de polvo en las áreas de trabajo con un
gran potencial de generación de Polvo o en las vías aledañas al área del
proyecto.
Objetivos Específicos:
4. ORGANIZACIÓN Y RESPONSABILIDADES
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
PLAN DE CONTROL DE POLVO VERSIÓN: 01
PÁGINA: 3 de 8
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
PLAN DE CONTROL DE POLVO VERSIÓN: 01
PÁGINA: 4 de 8
4.5. Empleados
• Es responsable de cumplir el Plan, para garantizar el desarrollo eficiente
del proyecto además de generar los mejores estándares de calidad.
• Seguir todos los requisitos, reglamentos, procedimientos y pautas
establecidas en referencia al presente Plan de control de la generación de
polvo en vías.
• Comunicar al Supervisor inmediato cuando tenga alguna duda acerca del
desarrollo de una labor en específico.
• Asimismo, los empleados deben ser involucrados en el desarrollo y
revisión de políticas y procedimientos para la gestión de riesgos
operacionales.
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
PLAN DE CONTROL DE POLVO VERSIÓN: 01
PÁGINA: 5 de 8
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
PLAN DE CONTROL DE POLVO VERSIÓN: 01
PÁGINA: 6 de 8
7. RUTAS DE RIEGO
Las rutas de riego se detallan en los anexos 02,03,04 y 05 estas rutas serán regadas
antes del inicio y durante las actividades de traslado de material contaminado o
material Topsoil o el material de préstamo.
8. REPORTE DE VOLUMEN DE AGUA A UTILIZAR
CAPACIDAD DE
DÍAS POR CISTERNA (LITROS,
PUNTO DE ABASTECIMIENTO
SEMANA M3, GALONES).
LITROS M3 GALONES
Lunes Garza Enriqueta o puntos autorizados 75600 75.6 20 000
Martes Garza Enriqueta o puntos autorizados 75600 75.6 20 000
Miércoles Garza Enriqueta o puntos autorizados 75600 75.6 20 000
Jueves Garza Enriqueta o puntos autorizados 75600 75.6 20 000
Viernes Garza Enriqueta o puntos autorizados 75600 75.6 20 000
Sábado Garza Enriqueta o puntos autorizados 75600 75.6 20 000
Domingo Garza Enriqueta o puntos autorizados 75600 75.6 20 000
TOTAL DE CONSUMO DE AGUA POR SEMANA 529200 529.2 140 000
Frecuencia estimada de riego en la ruta del campamento Km52 hasta Garita Huandoy se
considerado 02 ciclos
CAPACIDAD DE
DÍAS POR CISTERNA (LITROS,
PUNTO DE ABASTECIMIENTO
SEMANA M3, GALONES).
LITROS M3 GALONES
Lunes Garza Enriqueta o puntos autorizados 37800 37.8 10 000
Martes Garza Enriqueta o puntos autorizados 37800 37.8 10 000
Miércoles Garza Enriqueta o puntos autorizados 37800 37.8 10 000
Jueves Garza Enriqueta o puntos autorizados 37800 37.8 10 000
Viernes Garza Enriqueta o puntos autorizados 37800 37.8 10 000
Sábado Garza Enriqueta o puntos autorizados 37800 37.8 10 000
Domingo Garza Enriqueta o puntos autorizados 37800 37.8 10 000
TOTAL DE CONSUMO DE AGUA POR SEMANA 264600 264.6 70 000
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
PLAN DE CONTROL DE POLVO VERSIÓN: 01
PÁGINA: 7 de 8
UBICACIÓN DEL
PROYECTO
Garita Huandoy
Garita Huandoy
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
N° de Documento 26280-220-V253-VA30-00302
Emitido para
27-Ene-23 AR DR SH
su revisión
EMITIDO Gerente del
FECHA Elaborado Revisado
PARA Área
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
MC..1.1 Gestion del talento humano 33 26-Dec-22 27-Jan-23 27-Jan-23, MC..1.1 Gestion del talento humano
1.1.1 Inicio de gestión 0 26-Dec-22 Inicio de gestión, 26-Dec-22
1.1.2 Elaboración de Organigrama y matriz de com 5 06-Jan-23 10-Jan-23 Elaboración de Organigrama y matriz de com
1.1.3 Curva de personal para reserva de hospedaje 5 06-Jan-23 10-Jan-23 Curva de personal para reserva de hospedaje
1.1.4 Envío de perfiles de puesto de trabajo 5 11-Jan-23 15-Jan-23 Envío de perfiles de puesto de trabajo
1.1.5 Seguimiento de la selección y evaluación de candidatos 17 11-Jan-23 27-Jan-23 Seguimiento de la selección y evaluación de candidatos
1.1.6 Evaluación y liberación de personal por PATE 17 11-Jan-23 27-Jan-23 Evaluación y liberación de personal por PATE
1.1.7 Requisitos de los candidatos por SISDERGE 18 10-Jan-23 27-Jan-23 Requisitos de los candidatos por SISDERGE
1.1.8 Exámen Médico de Ingreso 6 11-Jan-23 16-Jan-23 Exámen Médico de Ingreso
1.1.9 Registro de personal para el procesamiento de fotochecks permanente
6 11-Jan-23 16-Jan-23 Registro de personal para el procesamiento de fotochecks permanente
1.1.9.1 Registro de fotocheck's al sistema 6 11-Jan-23 16-Jan-23 Registro de fotocheck's al sistema
1.1.9.2 Finalización de cursos de inducción 7 17-Jan-23 23-Jan-23 Finalización de cursos de inducción
1.1.9.3 Fin de gestión 0 27-Jan-23 Fin de gestión,
MC..1.2 Gestión de seguridad 32 27-Dec-22 27-Jan-23 27-Jan-23, MC..1.2 Gestión de seguridad
1.2.1 Inicio de Gestión de Seguridad 0 27-Dec-22 Inicio de Gestión de Seguridad, 27-Dec-22
1.2.2 Elaboración de Plan de seguridad y salud ocupacional 22 27-Dec-22 17-Jan-23 Elaboración de Plan de seguridad y salud ocupacional
1.2.3 Plan de higiene ambiental 22 27-Dec-22 17-Jan-23 Plan de higiene ambiental
1.2.4 PMAS 22 27-Dec-22 17-Jan-23 PMAS
1.2.5 Certificaciones específicas 5 18-Jan-23 22-Jan-23 Certificaciones específicas
1.2.6 Inducción Interna - SSOMA 5 23-Jan-23 27-Jan-23 Inducción Interna - SSOMA
1.2.7 Fin de gestion 0 27-Jan-23 Fin de gestion,
MC..1.3 Gestion logistica 22 06-Jan-23 27-Jan-23 27-Jan-23, MC..1.3 Gestion logistica
1.3.1 Inicio de Gestiones Logísticas 0 06-Jan-23 Inicio de Gestiones Logísticas, 06-Jan-23
1.3.2 Gestión de alojamiento y alimentación 7 06-Jan-23 12-Jan-23 Gestión de alojamiento y alimentación
1.3.3 Gestion de contratos de vehiculos 8 13-Jan-23 20-Jan-23 Gestion de contratos de vehiculos
1.3.4 Gestión de facilidades 7 21-Jan-23 27-Jan-23 Gestión de facilidades
1.3.5 Fin de gestión logistica 0 27-Jan-23 Fin de gestión logistica,
MC..1.4 Gestión de proyecto 24 27-Dec-22 19-Jan-23 19-Jan-23, MC..1.4 Gestión de proyecto
1.4.1 Inicio de Gestión 0 27-Dec-22 Inicio de Gestión, 27-Dec-22
1.4.2 Memoria Descriptiva 7 27-Dec-22 02-Jan-23 Memoria Descriptiva
1.4.3 Plan de Movilización y desmovilización 10 27-Dec-22 05-Jan-23 Plan de Movilización y desmovilización
1.4.4 Plan de Trabajo 14 27-Dec-22 09-Jan-23 Plan de Trabajo
1.4.5 Procedimiento Escrito de Trabajo Seguro (PETS) 10 31-Dec-22 09-Jan-23 Procedimiento Escrito de Trabajo Seguro (PETS)
1.4.6 Plan de calidad 14 27-Dec-22 09-Jan-23 Plan de calidad
1.4.7 Presentación de ITP 14 06-Jan-23 19-Jan-23 Presentación de ITP
1.4.8 Fin de gestión de proyecto 0 19-Jan-23 Fin de gestión de proyecto,
Actual Level of Effort Actual Work Critical Remaining Work Page 1 of 2 TASK filter: All Activities
Primary Baseline Remaining Work Milestone © Oracle Corporation
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
MC..4.1 Presentación final y aceptación 5 27-May-23 31-May-23 31-May-23, MC..4.1 Presentación final y aceptación
4.1.1 Presentación final de Dossier de calidad 3 27-May-23 29-May-23 Presentación final de Dossier de calidad
4.1.2 Aceptación por Bechtel 2 30-May-23 31-May-23 Aceptación por Bechtel
MC..4.2 Inicio de desmovilización 14 27-May-23 09-Jun-23 09-Jun-23, MC..4.2 Inicio de desmovilización
4.2.1 Desmovilización del sitio 14 27-May-23 09-Jun-23 Desmovilización del sitio
Actual Level of Effort Actual Work Critical Remaining Work Page 2 of 2 TASK filter: All Activities
Primary Baseline Remaining Work Milestone © Oracle Corporation
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
25BEA96C-1D7E-406C-BA9C-ABC4B5B6770B
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
Certificado de finalización
Identificador del sobre: 25BEA96C1D7E406CBA9CABC4B5B6770B Estado: Completado
Asunto: Complete con DocuSign: PMAS_ YSP-PMA-97140-G-0005 Construcción Plataforma de Embarque.pdf
Sobre de origen:
Páginas del documento: 53 Firmas: 5 Autor del sobre:
Páginas del certificado: 2 Iniciales: 0 German Vasquez-Barboza
Firma guiada: Activado 666 Burrard Street
Sello del identificador del sobre: Activado Suite 3400
Zona horaria: (UTC-08:00) Hora del Pacífico (Estados Unidos y Canadá) Vancouver, BC V6C 2X8
German.Vasquez-Barboza@newmont.com
Dirección IP: 200.4.242.98
Seguimiento de registro
Estado: Original Titular: German Vasquez-Barboza Ubicación: DocuSign
09/02/2023 13:09:45 German.Vasquez-Barboza@newmont.com
Certificado de finalización
Identificador del sobre: CD5C29E3B10B4FA997DA756955B44B46 Estado: Completado
Asunto: Complete con DocuSign: MRS-VPO_421_Construcción - Plataforma de Embarque y Desembarque Km52_YS_...
Sobre de origen:
Páginas del documento: 3 Firmas: 7 Autor del sobre:
Páginas del certificado: 6 Iniciales: 0 CARLOS MARTINEZ
Firma guiada: Activado 666 Burrard Street
Sello del identificador del sobre: Activado Suite 3400
Zona horaria: (UTC-08:00) Hora del Pacífico (Estados Unidos y Canadá) Vancouver, BC V6C 2X8
Carlos.MARTINEZ@newmont.com
Dirección IP: 200.4.242.98
Seguimiento de registro
Estado: Original Titular: CARLOS MARTINEZ Ubicación: DocuSign
09/02/2023 14:34:46 Carlos.MARTINEZ@newmont.com
From time to time, Newmont Corporation (we, us or Company) may be required by law to
provide to you certain written notices or disclosures. Described below are the terms and
conditions for providing to you such notices and disclosures electronically through the DocuSign
system. Please read the information below carefully and thoroughly, and if you can access this
information electronically to your satisfaction and agree to this Electronic Record and Signature
Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to
use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign
system.
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after the signing session and, if you
elect to create a DocuSign account, you may access the documents for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to
receive required notices and consents electronically from us or to sign electronically documents
from us.
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: nathan.moo@newmont.com
To let us know of a change in your email address where we should send notices and disclosures
electronically to you, you must send an email message to us at nathan.moo@newmont.com and
in the body of such request you must state: your previous email address, your new email
address. We do not require any other information from you to change your email address.
If you created a DocuSign account, you may update it with your new email address through your
account preferences.
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an email to nathan.moo@newmont.com and in the
body of such request you must state your email address, full name, mailing address, and
telephone number. We will bill you for any fees at that time, if any.
To inform us that you no longer wish to receive future notices and disclosures in electronic
format you may:
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
i. decline to sign a document from within your signing session, and on the subsequent page,
select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an email to nathan.moo@newmont.com and in the body of such request you must
state your email, full name, mailing address, and telephone number. We do not need any other
information from you to withdraw consent.. The consequences of your withdrawing consent for
online documents will be that transactions may take a longer time to process..
The minimum system requirements for using the DocuSign system may change over time. The
current system requirements are found here: https://support.docusign.com/guides/signer-guide-
signing-system-requirements.
Acknowledging your access and consent to receive and sign documents electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please confirm that you have
read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for
your future reference and access; or (ii) that you are able to email this ERSD to an email address
where you will be able to print on paper or save it for your future reference and access. Further,
if you consent to receiving notices and disclosures exclusively in electronic format as described
herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before
clicking ‘CONTINUE’ within the DocuSign system.
By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm
that:
You can access and read this Electronic Record and Signature Disclosure; and
You can print on paper this Electronic Record and Signature Disclosure, or save or send
this Electronic Record and Disclosure to a location where you can print it, for future
reference and access; and
Until or unless you notify Newmont Corporation as described above, you consent to
receive exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to you by Newmont Corporation during the course of your relationship with
Newmont Corporation.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
DOSSIER DE CIERRE
DE PMAS
INV. ROHUAY SRL
26280-220-HC3-A30-00253
NOVIEMBRE 2023
INVERSIONES ROHUAY
S.R.L
Ing. Telmo Plasencia Flores Ing. Marlon Trigoso Marín Segundo Huaihua Ruitón
Supervisor HSE Jefe de Operaciones Gerente General
FECHA: 08/12/2023 FECHA: 11/12/2023 FECHA: 13/12/2023
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
TABLA DE CONTENIDO
1. INFORMACIÓN GENERAL
1.1 NOMBRE DEL PROYECTO
1.2 GERENCIA/SUPERINTENDENCIA
1.3 NÚMERO DE CONTRATO
1.4 CÓDIGO DE PMAS
1.5 NÚMERO DE VPO
1.6 DESCRIPCIÓN O ALCANCE DEL PROYECTO
1.7 UBICACIÓN DEL PROYECTO
2. ACTIVIDADES DE CONTROLES PLANENADOS DEL PROYECTO O CAMBIO
2.1 EVALUACIÓN DE RIESGOS Y CONTROLES PLANEADOS DEL PROYECTO O
CAMBIO (ASPECTOS AMBIENTALES - PMAS)
AA2: Consumo de hidrocarburos
AA3: Consumo de productos químicos
AA5: Generación de residuos peligrosos
AA6: Consumo de agua
AA7: Consumo de energía eléctrica
AA8: Consumo de papel
AA9: Consumo de equipos de protección personal
AA11: Potencial derrame de productos peligrosos
AA12: Generación de emisiones de combustión interna
AA13: Generación de ruido
AA14: Generación de agua residual doméstica
AA18: Generación de residuos no peligrosos
AA20: Potencial derrame de productos no peligrosos
AA21: Potencial derrame de productos peligrosos
AA22: Potencial derrame de hidrocarburo
AA24: Consumo de alimentos
AA26: Generación de emisiones de combustión interna
AA27: Generación de vibración
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
1. INFORMACIÓN GENERAL
1.1 NOMBRE DEL PROYECTO
“CONSTRUCCIÓN – PLATAFORMA DE EMBARQUE Y DESEMBARQUE KM 52”
1.2 GERENCIA/SUPERINTENDENCIA
PROYECTO SULFUROS
CÓDIGO:
REGISTRO DE BIENES DE
CÓDIGO:
REVISIÓN:
APROBACIÓN: REGISTRO DE BIENES DE REVISIÓN:
EQUIPOS
APROBACIÓN:
VERSIÓN:
PÁGINA: EQUIPOS VERSIÓN:
PÁGINA:
L L
CONFORME CONFORME
E E
Y PARA SOPORTE Y PARA SOPORTE
E E
N INOPERATIVO N INOPERATIVO
D D
N/A N/A
A A
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Los productos químicos contarán con sus respectivas etiquetas NFPA y hojas
MSDS.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Kit antiderrame.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
ÁREA SPONSOR:
ADITIVO
PUNTO DE TRAMO VOLUMEN DE SUPRESOR DE FOTO DE CARGA FOTO DE RIEGO
Fecha EQUIPO (Cisterna) DISTANCIA (Km) CICLO (Minutos) N° DE VIAJES COMENTARIOS
ABASTECIMIENTO (VIAS - ACCESOS) AGUA (Glns.) POLVO DL10+ (Fechada - Georeferenciada) (Fechada - Georeferenciada)
(total Glns.)
2/09/2023
Los productos químicos contarán con sus respectivas etiquetas NFPA y hojas
MSDS.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
CÓDIGO: CÓDIGO:
EQUIPOS VERSIÓN:
PÁGINA:
EQUIPOS VERSIÓN:
PÁGINA:
PROVEEDOR : EMPRESA DE SERVICIOS GENERALES ESEGE GOICER SRL PROVEEDOR : C & G CONSTRUCTORES E INGENIEROS SAC
PLACA : AWN-881 PLACA : AXC-809
TIPO : Volquete TIPO : Volquete
CORREO : goicersrl@gmail.com CORREO : cyg.constructores@hotmail.com
TELEFONO : 976133969 TELEFONO : 965009272
PERIODO : AGOSTO PERIODO : AGOSTO
ITEM DETALLE DE BIEN SITUACION OBSERVACION ITEM DETALLE DE BIEN SITUACION OBSERVACION
1 ALARMA DE RETROCESO CONFORME 1 ALARMA DE RETROCESO CONFORME
2 CINTURON DE SEGURIDAD CONFORME 2 CINTURON DE SEGURIDAD CONFORME
3 ESPEJOS PARA SOPORTE Espejo con fisura. 3 ESPEJOS CONFORME
4 LLANTAS Y AROS CONFORME 4 LLANTAS Y AROS CONFORME Se corrigio neumático bajo 09/08/2023.
5 LLANTA DE REPUESTO N/A 5 LLANTA DE REPUESTO N/A
6 TUERCAS DE NEUMATICOS CONFORME 6 TUERCAS DE NEUMATICOS CONFORME
7 BOCINA / CLAXON CONFORME 7 BOCINA / CLAXON CONFORME
8 LUCES CONFORME Se corrigio foco quemado 06/08/2023. 8 LUCES CONFORME
9 LIMPIA PARABRISAS CONFORME 9 LIMPIA PARABRISAS CONFORME
10 ANTIVUELCO N/A 10 ANTIVUELCO N/A
11 HERRAMIENTAS CONFORME 11 HERRAMIENTAS CONFORME
12 GATO PARA NEUMATICOS CONFORME 12 GATO PARA NEUMATICOS CONFORME
13 CIRCULINA / BALIZA CONFORME 13 CIRCULINA / BALIZA CONFORME
14 EXTINTOR CONFORME 14 EXTINTOR CONFORME
15 BOTIQUIN CONFORME 15 BOTIQUIN CONFORME
16 TRIANGULOS DE SEGURIDAD N/A 16 TRIANGULOS DE SEGURIDAD CONFORME
17 TACOS PARA SOPORTE Falta un taco. 17 TACOS CONFORME
18 KIT ANTIDERRAME CONFORME 18 KIT ANTIDERRAME CONFORME
19 GPS N/A 19 GPS N/A
20 PANCARTA N/A 20 PANCARTA N/A
21 PERTIGA CONFORME 21 PERTIGA CONFORME
22 CABLE DE REMOLQUE N/A 22 CABLE DE REMOLQUE N/A
23 CABLE DE PASAR ENERGIA CONFORME 23 CABLE DE PASAR ENERGIA CONFORME
24 CONOS DE SEGURIDAD CONFORME 24 CONOS DE SEGURIDAD CONFORME
25 SEGURO DE TUERCAS CONFORME 25 SEGURO DE TUERCAS CONFORME
26 CAMARA DE RETROCESO N/A 26 CAMARA DE RETROCESO N/A
L L
CONFORME CONFORME
E E
Y PARA SOPORTE Y PARA SOPORTE
E E
N INOPERATIVO N INOPERATIVO
D D
N/A N/A
A A
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Los productos químicos contarán con sus respectivas etiquetas NFPA y hojas
MSDS.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Para los controles preventivos todos los vehículos contarán con su inspección
técnica vehicular vigente y el check list que se realizará a diario sobre el equipo.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Bandejas de contención.
CÓDIGO:
EQUIPOS VERSIÓN:
PÁGINA:
L
CONFORME
E
Y PARA SOPORTE
E
N INOPERATIVO
D
N/A
A
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Para los controles preventivos todos los vehículos contarán con su inspección
técnica vehicular vigente y el check list que se realizará a diario sobre el equipo.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Bandejas de contención.
CÓDIGO:
REGISTRO DE BIENES DE
CÓDIGO:
EQUIPOS
APROBACIÓN:
EQUIPOS VERSIÓN:
PÁGINA:
VERSIÓN:
PÁGINA:
L L
CONFORME CONFORME
E E
Y PARA SOPORTE Y PARA SOPORTE
E E
N INOPERATIVO N INOPERATIVO
D D
N/A N/A
A A
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
CÓDIGO: FO-HSE-INVRO-002
SISTEMA INTEGRADO DE GESTIÓN REVISIÓN: 02/01/2023
VERSION 03/01/2023
LISTA MAESTRA DE DOCUMENTOS INTERNOS FECHA: 01
PÁGINA: 1 de 1
Area: EHS
Responsable: ROSMEL DE LA CRUZ VASQUEZ / TELMO PLASENCIA FLORES
Fecha de
Item Código Nombre del Documento Tipo de Documento Ubicación N° Versión
aprobación
1 PETS-HSE-INVRO-001 TRANSPORTE DE PERSONAL DE PERSONAL DE CAJAMARCA A MINA Y VICEVERSA PETS DRIVE, ARCHIVADOR 002 3/01/2023
CARGA - DESCARGA DE MATERIALES, HERRAMIENTAS Y EQUIPOS CON CAMIÓN GRÚA / GRÚA TELESCÓPICA Y
2 PETS-HSE-INVRO-002 PETS DRIVE, ARCHIVADOR 002 10/02/2023
DESCARGA MANUAL.
3 PETS-HSE-INVRO-003 CARGA, TRANSPORTE Y DESCARGA DE CONTAINER CON CAMION GRUA. PETS DRIVE, ARCHIVADOR 002 10/02/2023
4 PETS-HSE-INVRO-004 CARGUIO, TRANSPORTE Y DESCARGA DE EQUIPOS EN CAMA BAJA PETS DRIVE, ARCHIVADOR 002 10/02/2023
5 PETS-HSE-INVRO-005 TRASLADO DE EQUIPOS, MATERIALES Y HERRAMIENTAS EN CAMIÓN PLATAFORMA Y CAMIONETA PETS DRIVE, ARCHIVADOR 002 10/02/2023
INSTALACIÓN DE SEÑALÉTICA, Y FACILIDADES (BARANDAS RÍGIDAS DE MADERA, HABILITACIÓN DE MADERA PARA
6 PETS-HSE-INVRO-006 PETS DRIVE, ARCHIVADOR 002 3/01/2023
SEÑALÉTICAS)
7 PETS-HSE-INVRO-007 TRABAJOS DE TOPOGRAFÍA CON APOYO DE EQUIPOS Y/OMANUALMENTE. PETS DRIVE, ARCHIVADOR 001 18/02/2023
8 PETS-HSE-INVRO-008 PASO DE CORRIENTE PARA ARRANQUE DE EQUIPO PETS DRIVE, ARCHIVADOR 001 18/02/2023
9 PETS-HSE-INVRO-009 CAMBIO DE NEUMÁTICO PETS DRIVE, ARCHIVADOR 001 18/02/2023
10 PETS-HSE-INVRO-011 CORTE Y MOVIMIENTO DE MATERIAL PETS DRIVE, ARCHIVADOR 001 18/02/2023
11 PETS-HSE-INVRO-012 ACARREO Y ELIMINACIÓN DE TOP SOIL Y MATERIAL EXCEDENTE PETS DRIVE, ARCHIVADOR 002 28/03/2023
12 PETS-HSE-INVRO-013 EXCAVACIÓN MECÁNICA Y MANUAL PETS DRIVE, ARCHIVADOR 002 18/02/2023
13 PETS-HSE-INVRO-014 RELLENO ESTRUCTURAL DE FUNDACIONES Y RELLENO MASIVO PETS DRIVE, ARCHIVADOR 001 18/02/2023
14 PETS-HSE-INVRO-022 INSTALACIÓN DE CERCO PERIMÉTRICO EN POZA PETS DRIVE, ARCHIVADOR 001 18/03/2023
15 PETS-HSE-INVRO-025 TRABAJOS DE INSTALACION DE SACOS PETS DRIVE, ARCHIVADOR 001 18/02/2023
16 PETS-HSE-INVRO-046 ENGRASE DE EQUIPOS DE LINEA AMARILLA PETS DRIVE, ARCHIVADOR 001 18/02/2023
17 PETS-HSE-INVRO-048 RELLENO DE LUBRICANTE PETS DRIVE, ARCHIVADOR 001 18/02/2023
18 PETS-HSE-INVRO-050 REGADO DE VIAS (AGUA NO POTABLE) PETS DRIVE, ARCHIVADOR 001 18/02/2023
19 PETS-HSE-INVRO-051 ABASTECIMIENTO DE COMBUSTIBLE PETS DRIVE, ARCHIVADOR 001 18/02/2023
20 PETS-HSE-INVRO-052 REUBICACIÓN Y SOLDADURA DE TUBERÍA HDP POR TERMOFUSIÓN PETS DRIVE, ARCHIVADOR 002 3/01/2023
21 PETS-HSE-INVRO-053 ACTIVIDADES DE ALMACÉN PETS DRIVE, ARCHIVADOR 001 18/02/2023
22 PETS-HSE-INVRO-054 ENCENDIDO Y APAGADO DE GENERADOR ELÉCTRICO PETS DRIVE, ARCHIVADOR 004 25/05/2023
23 PETS-HSE-INVRO-055 TRABAJOS DE CUADRADOR Y VIGIA PETS DRIVE, ARCHIVADOR 003 17/05/2023
24 PETS-HSE-INVRO-057 ENSAYO DE DENSIDAD DE CAMPO CON CONO DE ARENA Y HUMEDÓMETRO PETS DRIVE, ARCHIVADOR 002 18/05/2023
25 PL-HSE-INVRO-001 PLAN DE RESCATE Y REMOLQUE DE EQUIPOS PLAN DRIVE, ARCHIVADOR 001 23/12/2022
26 PL-HSE-INVRO-002 PLAN DE CAPACITACIONES PLAN DRIVE, ARCHIVADOR 002 23/12/2022
27 PL-HSE-INVRO-003 PLAN DE CONTROL DE ALCOHOL Y DROGAS PLAN DRIVE, ARCHIVADOR 001 23/12/2022
28 PL-HSE-INVRO-004 PLAN DE HIGIENE INDUSTRIAL PLAN DRIVE, ARCHIVADOR 001 23/12/2022
29 PL-HSE-INVRO-005 PLAN DE CONTROL DE FATIGA PLAN DRIVE, ARCHIVADOR 001 23/12/2022
30 PL-HSE-INVRO-006 PLAN ANUAL DE SALUD Y SEGURIDAD PLAN DRIVE, ARCHIVADOR 001 23/12/2022
31 PL-HSE-INVRO-007 PLAN DE MANEJO AMBIENTAL PLAN DRIVE, ARCHIVADOR 001 23/12/2022
32 PL-HSE-INVRO-008 MEMORIA DESCRIPTIVA PLAN DRIVE, ARCHIVADOR 004 23/+B43:G4312/2022
33 PL-HSE-INVRO-009 PLAN DE CONTROL DE POLVO PLAN DRIVE, ARCHIVADOR 001 23/12/2022
34 PL-HSE-INVRO-010 PLAN DE MANTENIMIENTO EQUIPOS PLAN DRIVE, ARCHIVADOR 001 23/01/2023
35 PL-HSE-INVRO-011 PLAN DE EMERGENCIAS AMBIENTALES PLAN DRIVE, ARCHIVADOR 001 23/12/2022
36 PL-HSE-INVRO-012 PLAN DE TRABAJO PLAN DRIVE, ARCHIVADOR 001 12/01/2023
37 PL-HSE-INVRO-013 PLAN DE TRÁNSITO Y RUTA DE MOVILIZACIÓN DE PERSONAL Y EQUIPO PESADO PLAN DRIVE, ARCHIVADOR 001 23/12/2022
38 PL-HSE-INVRO-014 PLAN DE RESPUESTA A EMERGENCIAS PLAN DRIVE, ARCHIVADOR 001 23/12/2022
SGS-CAT-PVPC-SARS- PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DE RIESGO DE CONTAGIO PARA SARS COV 2 EN
39 PLAN DRIVE, ARCHIVADOR 009 21/07/2022
COV2-001 INVERSIONES ROHUAY S.R.L
40 YAN-ENV-FOR-1932 PMAS (PLAN DE MANEJO AMBIENTAL Y SOCIAL) PLAN DRIVE, ARCHIVADOR 001 23/12/2022
41 PR-HSE-INVRO-001 PROCEDIMIENTO DE EQUIPOS DE PROTECCIÓN PERSONAL PROCEDIMIENTO DRIVE, ARCHIVADOR 001 23/12/2022
42 PR-HSE-INVRO-002 PROCEDIMIENTO DE CONDUCCION DE VEHÍCULOS PROCEDIMIENTO DRIVE, ARCHIVADOR 001 23/12/2022
43 ESR - FO - 007 VPO (VERIFICACIÓN PRE OPERACIONAL) VPO DRIVE, ARCHIVADOR 001 23/12/2022
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Marca temporal FECHA CÓDIGO DEL CUMPLIMIENTO INSPECTOR PRINCIPAL (NOMBRES Y APELLIDOS) Nº DE FOTOCHECK POSICIÓN/CARGO TIPO DE INSPECCIÓN LUGAR DE INSPECCIÓN
6/30/2023 7:55:01 21/06/2023 INVRO-YPS-IPSMA-007 ROSMEL DE LA CRUZ VASQUEZ - MARLON TRIGOSO MARÍN 1341146 EHS DESEMPEÑO MEDIO AMBIENTAL OFICINA ROHUAY FACILIDADES
7/6/2023 14:44:04 21/07/2023 INVRO-YPS-IPSMA-003 TELMO PLASENCIA FLORES 1339261 EHS DESEMPEÑO MEDIO AMBIENTAL PLATAFORMA EMBARQUE Y DESEMBARQUE KM 52
7/22/2023 8:32:10 17/07/2023 INVRO-YPS-PREIN-007 ROSMEL DE LA CRUZ VASQUEZ 1341146 EHS PLANIFICADO DE MANERA GENERAL FACILIDADES INVERSIONES ROHUAY
7/22/2023 8:42:55 22/07/2023 INVRO-YPS-IPSMA-013 ROSMEL DE LA CRUZ VASQUEZ/ MARLON TRIGOSO MARÍN 1341146/1102551 EHS DESEMPEÑO MEDIO AMBIENTAL CONSTRUCCIÓN DE PLATAFORMA DE EMBARQUE Y DESEMBARQUE
7/22/2023 14:42:04 22/07/2023 INVRO-YPS-OB-010 Wiliam Roberto Díaz Rodríguez 1223825 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL Plataforma Embarque y Desembarque Km 52
7/23/2023 10:54:49 23/07/2023 INVRO-YPS-IPSMA-012 Segundo Quilcate Plasencia 1225257 INGENIERÍA/SOPORTE DESEMPEÑO MEDIO AMBIENTAL Plataforma de Embarque y Desembarque Km. 52
7/23/2023 13:46:30 23/07/2023 INVRO-YPS-IPSMA-011 Nils Quispe Huamán 1300500 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL Plataforma km 52
8/23/2023 10:58:22 23/08/2023 INVRO-YPS-IPSMA-018 SEGUNDO QUILCATE PLASENCIA 1225257 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL PLATAFORMA EMBARQUE Y DESEMBARQUE KM52
8/23/2023 11:09:00 23/08/2023 INVRO-YPS-IPSMA-019 ROSMEL DE LA CRUZ VASQUEZ 1341146 EHS DESEMPEÑO MEDIO AMBIENTAL PLATAFORMA DE EMBARQUE Y DESEMBARQUE
8/26/2023 15:19:36 23/08/2023 INVRO-YPS-IPSMA-015 William Roberto Díaz Rodríguez 1223825 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL Estacionamiento volquetes campamento Km 52.
9/20/2023 16:10:34 18/09/2023 INVRO-YPS-IPSMA-025 ROSMEL DE LA CRUZ VASQUEZ 1341146 EHS PLANIFICADO DE MANERA GENERAL FACIALES INVERSIONES ROHUAY
9/20/2023 16:11:26 20/09/2023 INVRO-YPS-IPSMA-020 Lionel Cáceres Malaver 1315130 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL Construcción de plataforma km 52
9/25/2023 16:03:30 25/09/2023 INVRO-YPS-IPSMA-021 Díaz Rodríguez William Roberto 1223825 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL Facilidades Rohuay
9/29/2023 14:32:42 29/09/2023 INVRO-YPS-IPSMA-023 Nils Quispe Huaman 1300500 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL Plataforma km 52
9/29/2023 14:43:19 1/09/2023 INVRO-YPS-IPSMA-022 TELMO PLASENCIA FLORES 1339261 EHS DESEMPEÑO MEDIO AMBIENTAL PLATAFORMA DE EMBARQUE KM 52
9/29/2023 14:58:39 28/09/2023 INVRO-YPS-IPSMA-024 SEGUNDO QUILCATE PLASENCIA 1225257 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL EMBARQUE Y DESEMBARQUE PLATAFORMA KM 53
10/26/2023 14:19:36 26/10/2023 INVRO-YPS-IPSMA-024 SEGUNDO JAVIER QUILCATE PLASENCIA 1225257 CONSTRUCCIÓN DESEMPEÑO MEDIO AMBIENTAL FACILIDADES DE PLATAFORMA DE EMBARQUE Y DESEMBARQUE KM 52
CLASIFICACIÓN DEL HALLAZGO INSPECTORES SECUNDARIOS Nº DE FOTOCHECK CARGO QUE OCUPA 1. Área específica 2. Motivo de la Observación
RECOMENDACIÓN MARLON TRIGOSO MARÍN 1102551 JEFE DE OPERACIONES PROYECTO SULFUROS NO PLANIFICADA
RECOMENDACIÓN PROYECTO SULFUROS SE IDENTIFICÓ FALTA DE ORDEN Y LIMPIEZA EN LA ÁREA DE ACOPIO DE MOCHILAS.
RECOMENDACIÓN MARLON TRIGOSO MARÍN 11024312 JEFE DE OPERACIONES PROYECTOS SULFUROS PARA IDENTIFICAR OPORTUNIDADES DE MEJORA
RECOMENDACIÓN MARLON TRIGOSO MARÍN 1102551 Jefe de operaciones PROYECTO SULFUROS Evidenciar oportunidades de mejora
NO CONFORMIDAD MENOR Isamar Quiliche Aguirre 1346473 Supervisor de Control de Calidad Campamento Km 52 Control ambiental
RECOMENDACIÓN Nils Quispe Huaman 1300500 Ingeniero de Produccion Proyecto Sulfuro Llenado de sacos
RECOMENDACIÓN Rosmel de la cruz vasquez 1341146 EHS Almacen Encontrar oportunidades de mejora
RECOMENDACIÓN NILS QUISPE HUAMAN 1300500 SUPERVISION DE PRODUCCION AREA DE RESIDUOS SOLIDOS IDENTIFICAR OPORTUNIDAD DE MEJORA EN EL AREA DE TRABAJO
RECOMENDACIÓN MARLON TRIGOSO MARÍN 1341145 Gerente de proyecto PROYECTO SULFUROS Identificación de oportunidades de mejora
RECOMENDACIÓN Isamar Quiliche Aguirre 1346473 Supervisor Control de Calidad. Plataforma de embarque y desembarque Km 52. Aseguramiento de puntos filosos.
RECOMENDACIÓN MARLON TRIGOSO MARÍN 1102551 JEFE DE PROYECTOS PLATAFORMA DE EMBARQUE Y DESEMBARQUE ENCONTRAR OPORTUNIDADES DE MEJORA
RECOMENDACIÓN Lionel Cáceres Malaver 1315130 Ingeniero de Producción Construcción de plataforma Inadecuada disposición de materiales
RECOMENDACIÓN William Roberto Díaz Rodríguez 1223835 Jefe de Proyectos Contenedores facilidades Rohuay. Mala segregación.
RECOMENDACIÓN Diana Grau Zegarra 1343423 Supervisora de calidad Plataforma km 52 Cuidar el medio ambiente
NO CONFORMIDAD MENOR PROYECTO SULFUROS NO EXISTE DERIVACIÓN DE AGUAS DE LAS CUNETAS DE LA VÍA AL BUZÓN LA PLATAFORMA
RECOMENDACIÓN NILS QUISPE HUAMAN 1300500 INGENIERO DE PRODUCCION PROUECTO SULFURO INSPECCION DE RESIDUOS SOLIDOS
RECOMENDACIÓN NILS QUISPE HUAMAN 1300500 INGENIERO DE PRODUCCION PROYECTO SULFURO INSPECCION DE SEGREGACION DE RESIDUOS SOLIDOS DE ENCONTRO CONFORME
3. Equipos, herramientas o partes involucradas 4. Clase de peligro 5. Causa inmediata 6. Causa básica
NO APLICA C (completar en 07 días; condición o práctica que pro NO APLICA NO APLICA
SUELO B (completar en 72 horas; condición o práctica que pr Limpieza y orden deficientes Identificación y evaluación o exposición a perdidas
N/A C (completar en 07 días; condición o práctica que pro N/A N/A
Herramientas manuales C (completar en 07 días; condición o práctica que pro No aplica No aplica
Plana, pico, rastrillo. C (completar en 07 días; condición o práctica que pro Omisión de advertir. Mantenimiento inadecuado.
Herramientas manuales C (completar en 07 días; condición o práctica que pro No aplica No aplica
Bandejas de contención C (completar en 07 días; condición o práctica que pro No aplica No aplica
MATERIALES C (completar en 07 días; condición o práctica que pro NO APLICA NO APLICA
NA C (completar en 07 días; condición o práctica que pro NA NA
Trapo industrial y cintillos. C (completar en 07 días; condición o práctica que pro Omisión de advertir Controles
CONTENEDORES DE RESIDUOS C (completar en 07 días; condición o práctica que pro NA NA
Estructura metálica A (completar en 24 horas; condición o práctica que pr Omisión de procedimiento Incorrecta disposición
Papel toalla usado. A (completar en 24 horas; condición o práctica que pr Orden y limpieza deficientes / desorden Falta de experiencia.
CUNETAS, PLATAFORMA DE EMBARQUE Y DESEMBARQUE B (completar en 72 horas; condición o práctica que pr Omisión de advertir Mantenimiento inadecuado
ENVASE DESCARTABLE NO CORRESPONDE A TACHO DE VA PLASTICO VA A GENERALES C (completar en 07 días; condición o práctica que pro NAPLICA NO APLICA
CILINDROS DE RESISUOS C (completar en 07 días; condición o práctica que pro NO APLICA NO APLICA
7. Detalle de la acción correctiva inmediata (se relaciona con la causa inmediata) 8. Detalle de la acción correctiva permanente (se relaciona co 9. Fecha estimada de 10. Supervisor EHS 11. Adjunta evidencia (fotografías del hallazgo y acción correctiva de la inspección)
EL AREA SE ENCUENTRA CORRECTAMENTE, NO SE EVIDENCIA ACCIONES CORRECTIVAS NO SE 21/06/2023 ROSMEL DE LA CRUZ https://drive.google.com/open?id=1AqyxfdmYmPEauWxea7SG4R1Mq_wBh0_E
https://drive.google.com/open?id=1PjMXWQtp-dElV3d4gjSmBt2xfOC9n7Kj
Se realizó orden y limpieza en la zona. Inspección aleatoria de áreas de proyecto. 21/06/2023 TELMO PLASENCIA FLORES
https://drive.google.com/open?id=1SkhMDb0NMXptQ0tyherEDpLuB6lIpXZ7
N/A N/A 20/07/2023 ROSMEL DE LA CRUZ VASQUEZ https://drive.google.com/open?id=14YaaQk1JcFhR-UAO_QLNtg5DCu8FKEDV
No aplica k No aplica 22/07/2023 ROSMEL DE LA CRUZ VASQUEZ https://drive.google.com/open?id=1A0uXVgbkoI5xsNwXmwTKqTfAX0YRsUBd
Realizar limpieza de la cuneta. Inspecciones semanales. 22/07/2023 Rosmel de la Cruz Vasquez https://drive.google.com/open?id=1Qd8Ag8u6iuI2UMaGqtOrgdZzubqhW2q3
No aplica No aplica 23/07/2023 Rosmel de la Cruz Vasquez https://drive.google.com/open?id=1hPwZXza0mToWufAOSrnDURMZl6oMYCrM
No aplica No aplica 23/07/2023 Rosmel Delacruz vasquez https://drive.google.com/open?id=1eIVe0UQSMIV6tEibQ4ecm3Kk83QWT023
NO APLICA NO APLICA 30/08/2023 ROSMEL DE LA CRUZ VASQUEZ https://drive.google.com/open?id=1Edv4xHwwESIh6FZtvNOExLFQxEkbJpT8
NA NA 23/08/2023 TELMO PLASENCIA FLORES https://drive.google.com/open?id=1sGq3HZQkR2N4D2m8aSDX4rO1SkQlvI68
https://drive.google.com/open?id=1dqPUlaxt0k_AUxkofdM5Z6xEZUkCEGdk
Recubrir con trapo industrial y fijar con cintillos. Mejorar el diseño de ingeniería. 24/08/2023 Rosmel de la Cruz
https://drive.google.com/open?id=1-umEzkJw3wuCTJFJrbE5e1Mu3ZqJrvsL
NA NA 20/09/2023 ROSMEL DE LA CRUZ VASQUEZ https://drive.google.com/open?id=19VYIhgyPPYD4dD9KQYiAN_IvmdAB358_
https://drive.google.com/open?id=1rxThPJEZqBIhJzG4bJJKoQsnmEnWgdnP
Se recogio y segrego correctamente el material Se indico al personal la importancia de la correcta segregación 20/09/2023 Rosmel de la Cruz
https://drive.google.com/open?id=1ovYy36anjFqUSvL01h7V9POySHsuQAn2
https://drive.google.com/open?id=1mBBxDyRIRr4WwUEHgygqIMBKQRxQcNgQ
Correcta segregación inmediata. Retroalimentación a todo el personal. 25/09/2023 Telmo Plasencia Flores
https://drive.google.com/open?id=1WaX6Ih5N2R89bHrg2XJRV-djf62okFDS
https://drive.google.com/open?id=1yeIV8Q5T47bNLEZgJ8eDyg5Yilr1q_wE
Correctiva Contaminacion de materiales 29/09/2023 Telmo
https://drive.google.com/open?id=14WX4-am3sL2wA2hndUIGTcJAlUaZD4eW
SE REALIZA DREN PARA CONEXIÓN DE LA CUNETA DE LA VÍA AL BUZON DE LA PLATAFORMA MANTENIMIENTO DE LAS CUNETAS Y BUZONES. 2/09/2023 TELMO WELSERS PLASENCIA FLORES https://drive.google.com/open?id=1fBMSS7gayvDTYM_lN5Nt-_2XK-C2wEPl
NO APLICA NO APLICA 5/10/2023 TELMO PLASENCIA https://drive.google.com/open?id=18mkckcAN0rn9RrsW9nyZZBDihHPNzm4G
https://drive.google.com/open?id=1PEfD_taw37Q9c1a1r6U-r6qGlPBhZsYD
NO APLICA NO APLICA 2/11/2023 TELMO PLASENCIA https://drive.google.com/open?id=1oH5ve_PSoECobPnEtK2gmG7CUIjQbCib
https://drive.google.com/open?id=1OQMpZF1J_wkw-JTgzYlU5RX17v61d8PF
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
CÓDIGO: CÓDIGO:
EQUIPOS VERSIÓN:
PÁGINA:
EQUIPOS VERSIÓN:
PÁGINA:
PROVEEDOR : EMPRESA DE SERVICIOS GENERALES ESEGE GOICER SRL PROVEEDOR : C & G CONSTRUCTORES E INGENIEROS SAC
PLACA : AWN-881 PLACA : AXC-809
TIPO : Volquete TIPO : Volquete
CORREO : goicersrl@gmail.com CORREO : cyg.constructores@hotmail.com
TELEFONO : 976133969 TELEFONO : 965009272
PERIODO : AGOSTO PERIODO : AGOSTO
ITEM DETALLE DE BIEN SITUACION OBSERVACION ITEM DETALLE DE BIEN SITUACION OBSERVACION
1 ALARMA DE RETROCESO CONFORME 1 ALARMA DE RETROCESO CONFORME
2 CINTURON DE SEGURIDAD CONFORME 2 CINTURON DE SEGURIDAD CONFORME
3 ESPEJOS PARA SOPORTE Espejo con fisura. 3 ESPEJOS CONFORME
4 LLANTAS Y AROS CONFORME 4 LLANTAS Y AROS CONFORME Se corrigio neumático bajo 09/08/2023.
5 LLANTA DE REPUESTO N/A 5 LLANTA DE REPUESTO N/A
6 TUERCAS DE NEUMATICOS CONFORME 6 TUERCAS DE NEUMATICOS CONFORME
7 BOCINA / CLAXON CONFORME 7 BOCINA / CLAXON CONFORME
8 LUCES CONFORME Se corrigio foco quemado 06/08/2023. 8 LUCES CONFORME
9 LIMPIA PARABRISAS CONFORME 9 LIMPIA PARABRISAS CONFORME
10 ANTIVUELCO N/A 10 ANTIVUELCO N/A
11 HERRAMIENTAS CONFORME 11 HERRAMIENTAS CONFORME
12 GATO PARA NEUMATICOS CONFORME 12 GATO PARA NEUMATICOS CONFORME
13 CIRCULINA / BALIZA CONFORME 13 CIRCULINA / BALIZA CONFORME
14 EXTINTOR CONFORME 14 EXTINTOR CONFORME
15 BOTIQUIN CONFORME 15 BOTIQUIN CONFORME
16 TRIANGULOS DE SEGURIDAD N/A 16 TRIANGULOS DE SEGURIDAD CONFORME
17 TACOS PARA SOPORTE Falta un taco. 17 TACOS CONFORME
18 KIT ANTIDERRAME CONFORME 18 KIT ANTIDERRAME CONFORME
19 GPS N/A 19 GPS N/A
20 PANCARTA N/A 20 PANCARTA N/A
21 PERTIGA CONFORME 21 PERTIGA CONFORME
22 CABLE DE REMOLQUE N/A 22 CABLE DE REMOLQUE N/A
23 CABLE DE PASAR ENERGIA CONFORME 23 CABLE DE PASAR ENERGIA CONFORME
24 CONOS DE SEGURIDAD CONFORME 24 CONOS DE SEGURIDAD CONFORME
25 SEGURO DE TUERCAS CONFORME 25 SEGURO DE TUERCAS CONFORME
26 CAMARA DE RETROCESO N/A 26 CAMARA DE RETROCESO N/A
L L
CONFORME CONFORME
E E
Y PARA SOPORTE Y PARA SOPORTE
E E
N INOPERATIVO N INOPERATIVO
D D
N/A N/A
A A
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Control de polvo
Manejo de residuos
Se instalará una estación de baterías de RRSS los cuales estarán
debidamente señalizados y/o rotulados.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
Los productos químicos contarán con sus respectivas etiquetas NFPA y hojas
MSDS.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
CÓDIGO: FO-HSE-INVRO-002
SISTEMA INTEGRADO DE GESTIÓN REVISIÓN: 02/01/2023
VERSION 03/01/2023
LISTA MAESTRA DE DOCUMENTOS INTERNOS FECHA: 01
PÁGINA: 1 de 1
Area: EHS
Responsable: ROSMEL DE LA CRUZ VASQUEZ / TELMO PLASENCIA FLORES
Fecha de
Item Código Nombre del Documento Tipo de Documento Ubicación N° Versión
aprobación
1 PETS-HSE-INVRO-001 TRANSPORTE DE PERSONAL DE PERSONAL DE CAJAMARCA A MINA Y VICEVERSA PETS DRIVE, ARCHIVADOR 002 3/01/2023
CARGA - DESCARGA DE MATERIALES, HERRAMIENTAS Y EQUIPOS CON CAMIÓN GRÚA / GRÚA TELESCÓPICA Y
2 PETS-HSE-INVRO-002 PETS DRIVE, ARCHIVADOR 002 10/02/2023
DESCARGA MANUAL.
3 PETS-HSE-INVRO-003 CARGA, TRANSPORTE Y DESCARGA DE CONTAINER CON CAMION GRUA. PETS DRIVE, ARCHIVADOR 002 10/02/2023
4 PETS-HSE-INVRO-004 CARGUIO, TRANSPORTE Y DESCARGA DE EQUIPOS EN CAMA BAJA PETS DRIVE, ARCHIVADOR 002 10/02/2023
5 PETS-HSE-INVRO-005 TRASLADO DE EQUIPOS, MATERIALES Y HERRAMIENTAS EN CAMIÓN PLATAFORMA Y CAMIONETA PETS DRIVE, ARCHIVADOR 002 10/02/2023
INSTALACIÓN DE SEÑALÉTICA, Y FACILIDADES (BARANDAS RÍGIDAS DE MADERA, HABILITACIÓN DE MADERA PARA
6 PETS-HSE-INVRO-006 PETS DRIVE, ARCHIVADOR 002 3/01/2023
SEÑALÉTICAS)
7 PETS-HSE-INVRO-007 TRABAJOS DE TOPOGRAFÍA CON APOYO DE EQUIPOS Y/OMANUALMENTE. PETS DRIVE, ARCHIVADOR 001 18/02/2023
8 PETS-HSE-INVRO-008 PASO DE CORRIENTE PARA ARRANQUE DE EQUIPO PETS DRIVE, ARCHIVADOR 001 18/02/2023
9 PETS-HSE-INVRO-009 CAMBIO DE NEUMÁTICO PETS DRIVE, ARCHIVADOR 001 18/02/2023
10 PETS-HSE-INVRO-011 CORTE Y MOVIMIENTO DE MATERIAL PETS DRIVE, ARCHIVADOR 001 18/02/2023
11 PETS-HSE-INVRO-012 ACARREO Y ELIMINACIÓN DE TOP SOIL Y MATERIAL EXCEDENTE PETS DRIVE, ARCHIVADOR 002 28/03/2023
12 PETS-HSE-INVRO-013 EXCAVACIÓN MECÁNICA Y MANUAL PETS DRIVE, ARCHIVADOR 002 18/02/2023
13 PETS-HSE-INVRO-014 RELLENO ESTRUCTURAL DE FUNDACIONES Y RELLENO MASIVO PETS DRIVE, ARCHIVADOR 001 18/02/2023
14 PETS-HSE-INVRO-022 INSTALACIÓN DE CERCO PERIMÉTRICO EN POZA PETS DRIVE, ARCHIVADOR 001 18/03/2023
15 PETS-HSE-INVRO-025 TRABAJOS DE INSTALACION DE SACOS PETS DRIVE, ARCHIVADOR 001 18/02/2023
16 PETS-HSE-INVRO-046 ENGRASE DE EQUIPOS DE LINEA AMARILLA PETS DRIVE, ARCHIVADOR 001 18/02/2023
17 PETS-HSE-INVRO-048 RELLENO DE LUBRICANTE PETS DRIVE, ARCHIVADOR 001 18/02/2023
18 PETS-HSE-INVRO-050 REGADO DE VIAS (AGUA NO POTABLE) PETS DRIVE, ARCHIVADOR 001 18/02/2023
19 PETS-HSE-INVRO-051 ABASTECIMIENTO DE COMBUSTIBLE PETS DRIVE, ARCHIVADOR 001 18/02/2023
20 PETS-HSE-INVRO-052 REUBICACIÓN Y SOLDADURA DE TUBERÍA HDP POR TERMOFUSIÓN PETS DRIVE, ARCHIVADOR 002 3/01/2023
21 PETS-HSE-INVRO-053 ACTIVIDADES DE ALMACÉN PETS DRIVE, ARCHIVADOR 001 18/02/2023
22 PETS-HSE-INVRO-054 ENCENDIDO Y APAGADO DE GENERADOR ELÉCTRICO PETS DRIVE, ARCHIVADOR 004 25/05/2023
23 PETS-HSE-INVRO-055 TRABAJOS DE CUADRADOR Y VIGIA PETS DRIVE, ARCHIVADOR 003 17/05/2023
24 PETS-HSE-INVRO-057 ENSAYO DE DENSIDAD DE CAMPO CON CONO DE ARENA Y HUMEDÓMETRO PETS DRIVE, ARCHIVADOR 002 18/05/2023
25 PL-HSE-INVRO-001 PLAN DE RESCATE Y REMOLQUE DE EQUIPOS PLAN DRIVE, ARCHIVADOR 001 23/12/2022
26 PL-HSE-INVRO-002 PLAN DE CAPACITACIONES PLAN DRIVE, ARCHIVADOR 002 23/12/2022
27 PL-HSE-INVRO-003 PLAN DE CONTROL DE ALCOHOL Y DROGAS PLAN DRIVE, ARCHIVADOR 001 23/12/2022
28 PL-HSE-INVRO-004 PLAN DE HIGIENE INDUSTRIAL PLAN DRIVE, ARCHIVADOR 001 23/12/2022
29 PL-HSE-INVRO-005 PLAN DE CONTROL DE FATIGA PLAN DRIVE, ARCHIVADOR 001 23/12/2022
30 PL-HSE-INVRO-006 PLAN ANUAL DE SALUD Y SEGURIDAD PLAN DRIVE, ARCHIVADOR 001 23/12/2022
31 PL-HSE-INVRO-007 PLAN DE MANEJO AMBIENTAL PLAN DRIVE, ARCHIVADOR 001 23/12/2022
32 PL-HSE-INVRO-008 MEMORIA DESCRIPTIVA PLAN DRIVE, ARCHIVADOR 004 23/+B43:G4312/2022
33 PL-HSE-INVRO-009 PLAN DE CONTROL DE POLVO PLAN DRIVE, ARCHIVADOR 001 23/12/2022
34 PL-HSE-INVRO-010 PLAN DE MANTENIMIENTO EQUIPOS PLAN DRIVE, ARCHIVADOR 001 23/01/2023
35 PL-HSE-INVRO-011 PLAN DE EMERGENCIAS AMBIENTALES PLAN DRIVE, ARCHIVADOR 001 23/12/2022
36 PL-HSE-INVRO-012 PLAN DE TRABAJO PLAN DRIVE, ARCHIVADOR 001 12/01/2023
37 PL-HSE-INVRO-013 PLAN DE TRÁNSITO Y RUTA DE MOVILIZACIÓN DE PERSONAL Y EQUIPO PESADO PLAN DRIVE, ARCHIVADOR 001 23/12/2022
38 PL-HSE-INVRO-014 PLAN DE RESPUESTA A EMERGENCIAS PLAN DRIVE, ARCHIVADOR 001 23/12/2022
SGS-CAT-PVPC-SARS- PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DE RIESGO DE CONTAGIO PARA SARS COV 2 EN
39 PLAN DRIVE, ARCHIVADOR 009 21/07/2022
COV2-001 INVERSIONES ROHUAY S.R.L
40 YAN-ENV-FOR-1932 PMAS (PLAN DE MANEJO AMBIENTAL Y SOCIAL) PLAN DRIVE, ARCHIVADOR 001 23/12/2022
41 PR-HSE-INVRO-001 PROCEDIMIENTO DE EQUIPOS DE PROTECCIÓN PERSONAL PROCEDIMIENTO DRIVE, ARCHIVADOR 001 23/12/2022
42 PR-HSE-INVRO-002 PROCEDIMIENTO DE CONDUCCION DE VEHÍCULOS PROCEDIMIENTO DRIVE, ARCHIVADOR 001 23/12/2022
43 ESR - FO - 007 VPO (VERIFICACIÓN PRE OPERACIONAL) VPO DRIVE, ARCHIVADOR 001 23/12/2022
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
3. CONCLUSIONES
Conforme a los compromisos operacionales que se implementaron en el desarrollo del
presente proyecto podemos concluir que:
El uso de sistemas de contención (bandejas) han permitido evitar impactos
negativos al medio ambiente provocados por derrame de hidrocarburos u otros
materiales peligrosos utilizados.
Se logró gestionar de manera oportuna las autorizaciones de uso de las hojas
MSDS de todos los MATPEL requeridos y usados en proyecto.
DocuSign Envelope ID: 3552E555-8652-41B6-A9A2-EBCC572F03D5
REVISIÓN: 11/12/2023
MEMORIA DESCRIPTIVA
MEMORIA DESCRIPTIVA
NOMBRE
253 CC Plataforma de Embarque y Desembarque
PROYECTO:
CODIGO DE
26280-220-HC3-VA30-00253
CONTRATO:
ÁREA: CONSTRUCCION
ESPECIALIDAD: SEGURIDAD
26280-220-HC3-VA30-00253
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 1 de 7
1. CONTRATISTA
Inversiones Rohuay SRL.
5. GERENCIA
Proyectos
6. SPONSOR
Mario Adrianzen
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 2 de 7
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 3 de 7
3.00 PROFIT
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 4 de 7
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 5 de 7
8. ORGANIGRAMA
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 6 de 7
EQUIPOS
REVISIÓN: 22/12/2022
APROBACIÓN: 23/12/2022
MEMORIA DESCRIPTIVA VERSIÓN: 01
PÁGINA: 2 de 7
DRENAJE
TALUDES
Seguimiento de registro
Estado: Original Titular: German Vasquez-Barboza Ubicación: DocuSign
12/01/2024 13:09:11 German.Vasquez-Barboza@newmont.com
MARIO ADRIANZEN
Mario.ADRIANZEN@newmont.com
Nivel de seguridad: Correo electrónico,
Autenticación de cuenta (ninguna)
Divulgación de firma y Registro electrónicos:
No se ofreció a través de DocuSign
FREDI CARDENAS
Fredi.CARDENAS@newmont.com
Nivel de seguridad: Correo electrónico,
Autenticación de cuenta (ninguna)
Divulgación de firma y Registro electrónicos:
No se ofreció a través de DocuSign
francisco
Francisco.CUADROS@newmont.com
Nivel de seguridad: Correo electrónico,
Autenticación de cuenta (ninguna)
Divulgación de firma y Registro electrónicos:
No se ofreció a través de DocuSign
Carlos MARTINEZ
Carlos.MARTINEZ@newmont.com
Nivel de seguridad: Correo electrónico,
Autenticación de cuenta (ninguna)
Divulgación de firma y Registro electrónicos:
No se ofreció a través de DocuSign
From time to time, Newmont Corporation (we, us or Company) may be required by law to
provide to you certain written notices or disclosures. Described below are the terms and
conditions for providing to you such notices and disclosures electronically through the DocuSign
system. Please read the information below carefully and thoroughly, and if you can access this
information electronically to your satisfaction and agree to this Electronic Record and Signature
Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to
use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign
system.
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after the signing session and, if you
elect to create a DocuSign account, you may access the documents for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to
receive required notices and consents electronically from us or to sign electronically documents
from us.
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: nathan.moo@newmont.com
To let us know of a change in your email address where we should send notices and disclosures
electronically to you, you must send an email message to us at nathan.moo@newmont.com and
in the body of such request you must state: your previous email address, your new email
address. We do not require any other information from you to change your email address.
If you created a DocuSign account, you may update it with your new email address through your
account preferences.
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an email to nathan.moo@newmont.com and in the
body of such request you must state your email address, full name, mailing address, and
telephone number. We will bill you for any fees at that time, if any.
To inform us that you no longer wish to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your signing session, and on the subsequent page,
select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an email to nathan.moo@newmont.com and in the body of such request you must
state your email, full name, mailing address, and telephone number. We do not need any other
information from you to withdraw consent.. The consequences of your withdrawing consent for
online documents will be that transactions may take a longer time to process..
The minimum system requirements for using the DocuSign system may change over time. The
current system requirements are found here: https://support.docusign.com/guides/signer-guide-
signing-system-requirements.
Acknowledging your access and consent to receive and sign documents electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please confirm that you have
read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for
your future reference and access; or (ii) that you are able to email this ERSD to an email address
where you will be able to print on paper or save it for your future reference and access. Further,
if you consent to receiving notices and disclosures exclusively in electronic format as described
herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before
clicking ‘CONTINUE’ within the DocuSign system.
By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm
that:
You can access and read this Electronic Record and Signature Disclosure; and
You can print on paper this Electronic Record and Signature Disclosure, or save or send
this Electronic Record and Disclosure to a location where you can print it, for future
reference and access; and
Until or unless you notify Newmont Corporation as described above, you consent to
receive exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to you by Newmont Corporation during the course of your relationship with
Newmont Corporation.