Está en la página 1de 9

INDUSTRIAL LOS AVENGERS S.A.

C
CONCEPTOS DPTOI DPTOII DPTOIII
UNIDADES COMENZADAS EN PROCESO 92,500
AUMENTO EN EL NUMERO DE UNIDADES DEBIDO A
MATERIALES AÑADIDOS 18,000 20,000

COMPLETADAS Y TRANFERIDAS AL DPTO SIGUIENTE 55,500 40,425 30,213


PRODUCTOS EN PROCESOS
TODOS LOS MATERIALES, 45% DE MANO DE OBRA Y
CARGA FABRIL 27,750
TODOS LOS MATERIALES, 55% DE MANO DE OBRA Y
CARGA FABRIL 25,725

TODOS LOS MATERIALES, 60% DE MANO DE OBRA Y


CARGA FABRIL 18,128
PRERDIDAS EN PRODUCCION 9,250 7,350 12,085
TOTAL JUSTIFICADO 92,500 73,500 60,425

LOS COSTOS DE FABRICACION PARA ESTE PERIODO FUERON:

CONCEPTOS DPTOI DPTOII DPTOIII


COSTOS DE MATERIALES 178,000 120,000 131,500
COSTOS DE MANO DE OBRA 62,500 65,300 48,200
COSTOS DE CARGA FABRIL 36,000 22,100 29,800

EJECUTAR
1. PRODUCCION EQUIVALENTE:

73,500
60,425 TERMINADAS Y TRASFERIDAS

EN PROCESO

TOTAL

2. DETERMINACION DE LOS COSTOS UNITARIOS:

TERMINADAS Y TRASFERIDAS
EN PROCESO
TOTAL
TOTAL

3.REAJUSTES DE LOS COSTOS POR UNIDADES AUMENTADAS:

4: COSTOS DE LAS UNIDADES PERDIDAS:

5: COSTOS DE LAS UNIDADES TERMINADAS Y TRASFERIDAS:


6: COSTOS DE LAS UNIDADES EM PROCESO:

DETALLE
MATERIALES
MANO DE OBRA
CARGA FABRIL
TOTAL

DETALLE
MATERIALES
MANO DE OBRA
CARGA FABRIL
TOTAL

DETALLE
MATERIALES
MANO DE OBRA
CARGA FABRIL
TOTAL

COSTOS DE FABRICACION

COSTO DE DPTO ANTERIOR

COSTO AJUST. DE UNID. AUMENT.

COSTO DE UNIDADES PERDIDAS

COSTO AJUSTADO
COSTOS DEL DEPARTAMENTO ACTUAL

MATERIALES

MANO DE OBRA

CARGA FABRIL

COSTO TOTAL DEL DEPARTAMENTO

COSTO TOTAL

DISTRIBUCION DE LOS COSTOS

TERMINADAS Y TRASFERIDAS

EN PROCESO
COSTO TOTAL
INDUSTRIAL LOS AVENGERS S.A.C
HOJA DE CALCULO

DPTOI DPTOI DPTOI


COSTOS DE COSTOS DE
MATERIALES CONVERSION MATERIALES CONVERSION MATERIALES
DAS 55,500 55,500.00 40,425.00 40,425.00 30,212.50

27,750.00 12,487.50 25,725.00 14,148.75 18,127.50

83,250.00 67,987.50 66,150.00 54,573.75 48,340.00

DPTOI DPTOII
1 2 1 2
DAS 178,000 83,250.00 2.14 120,000 66,150.00
62,500 67,987.50 0.92 65,300 54,573.75
36,000 67,987.50 0.53 22,100 54,573.75
3.59

UMENTADAS:

DPTOI DPTOII
1 2 1 2
199,074.83 55,500.00
18,000.00
199,074.83 73,500.00

DPTOI
DPTOII 2.71 7,350 19,907.48 66,150.00
DPTOIII 4.30 12,085 51,946.18 48,340.00

RASFERIDAS:
DPTOI DPTOII
55500 3.59 199,074.83
40,425 6.43

DPTOI

27,750 2.14 59333.33


27,750 45% 12487.5 0.92 11,479.59
27,750 45% 12487.5 0.53 6,612.24
77,425.17

DPTOII

25,725 4.82 124084.66


25725 55% 14148.75 1.20 16,929.63
25725 55% 14148.75 0.40 5,729.63
146,743.92

DPTOII

18,128 8.09 146,711.59


18,128 60% 10876.5 1.17 12,758.82
18,128 60% 10876.5 0.73 7,888.24
167,358.65

HOJA DE COSTOS POR PROCESO


DEPARTAMENTO I DEPARTAMENTO II DEPARTAMENTO III

199,074.83 3.59 259,730.91 6.43

199,074.83 2.71 259,730.91 4.30

0.30 1.07

199,074.83 3.01 259,730.91 5.37


178,000 2.14 120,000 1.81 131,500 2.72

62,500 0.92 65,300 1.20 48,200 1.17

36,000 0.53 22,100 0.40 29,800 0.73

276,500 3.59 207,400 3.42 209,500 4.62

276,500 3.59 406,474.83 6.43 469,230.91 9.99

199,074.83 259,730.91 301,872

77,425.17 146,743.92 167,358.65


276500 406,474.83 6.43 469,230.91 9.99
DPTOI
COSTOS DE
CONVERSION
30,212.50

10,876.50

41,089.00

PTOII DPTOII
1 2
1.81 131,500 48,340.00 2.72
1.20 48,200 41,089.00 1.17
0.40 29,800 41,089.00 0.73
3.42 4.62

PTOII DPTOII
1 2
3.59 259,730.91 40,425.00 6.43
20,000.00
2.71 259,730.91 60,425.00 4.30

0.30
1.07
PTOII DPTOIII

259,730.91
30,213 9.99 301,872.26

También podría gustarte