Está en la página 1de 4

Document HSLP MS009 G02

NEWMONT MINING CORPORATION Page:


Version:
1 of 4
4.0
Health, Safety and Loss Prevention Issue date: Jan 2008
Author: Global HSLP Team
Approval: M. Byrne

SAFETY ALERT/ LOSS ANNOUNCEMENT


(Part 1)
This is NOT an investigation report. It is a WARNING related to an Alert of an Accident/Incident event that has taken
place at a Newmont operation. The information below is a preliminary assessment and not a formal investigation.

OPERATION: NPL Exploration


Property Process
ISSUED BY: Jorge Oropeza A. Incident Injury
Damage Loss
DATE: 11de abril, 2009
TIME: 16:00

LOCATION/DEPARTMENT:
Proyecto Niñobamba, X X X
Exploración
Alrededor de las 4:00 p.m., un rayo impactó cerca de dos personas del grupo
NPL Exploration cuando regresaban del campo después de hacer mapeos y
muestreos. Ambos estuvieron inconcientes durante algunos minutos (5-7) dada
la fuerza y proximidad de la caída del rayo. Los dos empleados pudieron
regresar a su camioneta (ubicada a una hora de caminata) y luego al
campamento base en Tunsulla sin percances.
INCIDENT/ ACCIDENT
DESCRIPTION: Actualización
Según la investigación, los empleados estaban regresando de su área de
trabajo y oyeron el trueno a la distancia. Según el entrenamiento que recibieron,
esta descarga en particular era la primera descarga sin ninguna alarma adicional
y no fue captada por el detector que estaba activado y era portado por los
empleados. Asimismo, había una vaca muerta muy cerca al lugar donde los
empleados perdieron el conocimiento, al parecer la vaca absorbió la fuerza
principal de la caída del rayo e impidió que el personal reciba el impacto total.

INJURY TYPE/DAMAGE: Los empleados fueron evacuados al Hospital General de Huamanga (Ayacucho)
(Include estimated Property y fueron evaluados durante la noche, luego fueron trasladados a Lima para
Damage and/or Process loss evaluaciones adicionales y resonancia magnética. Ambos empleados fueron
costs) dados de alta con 10 días de descanso.
Daño a la propiedad $0.
$0.00
Pérdida de procesos $ 1,348.
348.00
Gastos médicos $ 1,695.
695.00

POTENTIAL FOR INJURY / RISK LEVEL: 3 Moderado 4 Mayor 5 X Catastrófico


LOSS :

PROBABLE IMMEDIATE Inadecuado sistema de advertencia


CAUSES: - El detector portátil de descargas eléctricas no emitió la alarma (algo que
es común cuando no detecta descargas previas)

THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT


Date Printed: 5/22/2023
Document HSLP MS009 G02
NEWMONT MINING CORPORATION Page:
Version:
2 of 4
4.0
Health, Safety and Loss Prevention Issue date: Jan 2008
Author: Global HSLP Team
Approval: M. Byrne

- No se pudo anticipar un cambio climático brusco en un área con altura mayor a


PROBABLE BASIC CAUSE: los 4,000 m.s.n.m., evento que además se vio favorecido por el cambio de
estación verano – invierno.
- Reevaluación del plan de campo y plan de reacción inmediata cuando se
IMMEDIATE CORRECTIVE
corre el riesgo de estar expuesto a la caída de rayos.
ACTION:

Lugar del incidente

This is NOT an investigation report. It is a WARNING related to an ALERT of an Accident/Incident event that has taken place at a
Newmont operation. The information above is a preliminary assessment of the event and is not a formal investigation.

THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT


Date Printed: 5/22/2023
Document HSLP MS009 G02
NEWMONT MINING CORPORATION Page:
Version:
3 of 4
4.0
Health, Safety and Loss Prevention Issue date: Jan 2008
Author: Global HSLP Team
Approval: M. Byrne

SAFETY ALERT/ LOSS ANNOUNCEMENT


Follow Up Form
This form is to be used as a follow-up tool that will document the Basic / Immediate Causes and Corrective Actions that were
derived from the original incident which triggered the Safety Alert / Loss Announcement. Please complete within 14 days of
the original incident, and then forward to Corporate HSLP for review and global distribution.

Follow Up Form G. Sundquist


Completed by:
Corrective Actions:
- Todos los sites de alto riesgo deben emplear el detector de
tormentas personal Spectrum Thunderbolt según recomendación
del experto en materia de rayos de Newmont.

- Se debe completar la revisión del procedimiento regional de la


documentación en relación a tormentas eléctricas a fin de asegurar
que se inserte información adecuada en el procedimiento de
advertencia de Rayos / Tormenta, procedimiento de Primeros
Auxilios, síntomas en las personas que han sufrido la descarga de
un rayo y evacuación inmediata de personal expuesto a la caída
de un rayo cercana los cuales serán incluidos en los registros de
riesgos regionales.
- Se dará entrenamiento en todos los sites el cual será incorporado
en simulacros de respuesta a emergencias dirigido a todos los
empleados que laboren en sites y regiones con alto riesgo de
tener tormentas eléctricas.
- Asegurar que los sistemas adecuados estén disponibles en el
campamento base así como para los trabajadores a fin de
comunicar e iniciar el procedimiento de advertencia ante tormentas
eléctricas.
- Adoptar el protocolo de advertencia climática local diariamente en
todas las áreas de alto riesgo a través de la emisión de
información sobre advertencia climática disponible en el site así
como por Internet, vía teléfono o radio y realizar reuniones
informativas sobre las condiciones climáticas en todos los sites de

THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT


Date Printed: 5/22/2023
Document HSLP MS009 G02
NEWMONT MINING CORPORATION Page:
Version:
4 of 4
4.0
Health, Safety and Loss Prevention Issue date: Jan 2008
Author: Global HSLP Team
Approval: M. Byrne

alto riesgo.
- Asegurar el uso de detectores de tormentas así como refugios
ante las mismas en todos los campamentos base dentro del área
de alto riesgo a fin de incluir pararrayos, detectores fijos y alarmas.

THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT


Date Printed: 5/22/2023