Está en la página 1de 7

CUADRO DE AREAS TECHADAS

ITEM DESCRIPCION PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

SECUNDARIA 1,246.07 1,233.55 1,041.73 3,521.35


MODULO O: 02 AULAS
02 AULAS: 1-2 113.14
CORREDOR + PUENTE 79.58 79.58
ESCALERA 23.90
LABORATORIO DE COMPUTO 56.57
CRT 28.29
TERRAZA 28.29
PUENTE ASCENSOR 41.47 46.30
SUB TOTAL 234.19 262.92
MODULO R: 03 AULAS
09 AULAS 169.71 169.71 169.71
CORREDOR 53.10 53.10 53.10
ESCALERA 23.90
SUB TOTAL 222.81 222.81 246.71
MODULO Q3: 02 AULAS
6 AULAS 113.14 113.14 113.14
CORREDOR 33.31 33.31 33.31
CORREDOR BAÑO 17.84 17.84 17.84
SSHH ALUMNOS / HOMBRES 22.97 22.97 22.97
SSHH ALUMNOS / MUJERES 18.77 18.77 18.77
SSHH ALUMNOS / DISCAPACITADOS 5.40 5.40 5.40
SSHH PROFESORES / HOMBRES 4.18 4.18 4.18
SSHH PROFESORES / MUJERES 3.66 3.66 3.66
CUARTO DE LIMPIEZA 3.10 3.10 3.10
SUB TOTAL 222.37 222.37 222.37
MODULO Q2: 02 AULAS
6 AULAS 113.14 113.14 113.14
ESCALERA 23.60
CORREDOR 38.10 38.10 38.10
SUB TOTAL 151.24 151.24 174.84
MODULO Q1: 02 AULAS
6 AULAS 113.14 113.14 113.14
CORREDOR 33.30 33.30 33.30
CORREDOR BAÑO 18.30 18.30 18.30
SSHH ALUMNOS / HOMBRES 22.97 22.97 22.97
SSHH ALUMNOS / MUJERES 18.77 18.77 18.77
SSHH ALUMNOS / DISCAPACITADOS 5.40 5.40 5.40
SSHH PROFESORES / HOMBRES 4.18 4.18 4.18
SSHH PROFESORES / MUJERES 3.66 3.66 3.66

1
CUADRO DE AREAS TECHADAS

ITEM DESCRIPCION PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

CUARTO DE LIMPIEZA 3.10 3.10 3.10


SUB TOTAL 222.82 222.82 222.82
MODULO P: 02 AULAS
6 AULAS 113.14 113.14 113.14
ESCALERA 23.60
CORREDOR 38.25 38.25 38.25
PORTICO + CASETA DE CONTROL 41.25
SUB TOTAL 192.64 151.39 174.99

PRIMARIA 1,783.06 1,886.56 3,669.6


MODULO I: 02 AULAS
04 AULAS 113.14 113.14
CORREDOR 39.60 39.60
CORREDOR-W2 9.50 9.50
ESCALERA 23.90
SUB TOTAL 162.24 186.14
MODULO H3: 03 AULAS
06 AULAS 169.71 169.71
ESCALERA 23.90
CORREDOR 49.00 49.00
CORREDOR BAÑO 18.30 18.30
SSHH ALUMNOS / HOMBRES 22.97 22.97
SSHH ALUMNOS / MUJERES 18.77 18.77
SSHH ALUMNOS / DISCAPACITADOS 5.40 5.40
SSHH PROFESORES / HOMBRES 4.18 4.18
SSHH PROFESORES / MUJERES 3.66 3.66
CUARTO DE LIMPIEZA 3.10 3.10
SUB TOTAL 295.09 318.99
MODULO H2: 02 AULAS
04 AULAS 113.14 113.14
ESCALERA 23.90
CORREDOR 38.30 38.30
SUB TOTAL 151.44 175.34
MODULO H1: 02 AULAS
04 AULAS 113.14 113.14
CORREDOR 33.45 33.45
CORREDOR BAÑO 18.30 18.30
SSHH ALUMNOS / HOMBRES 22.97 22.97
SSHH ALUMNOS / MUJERES 18.77 18.77
SSHH ALUMNOS / DISCAPACITADOS 5.40 5.40
SSHH PROFESORES / HOMBRES 4.18 4.18

2
CUADRO DE AREAS TECHADAS

ITEM DESCRIPCION PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

SSHH PROFESORES / MUJERES 3.66 3.66


CUARTO DE LIMPIEZA 3.10 3.10
SUB TOTAL 222.97 222.97
MODULO G: 02 AULAS
04 AULAS 113.14 113.14
CORREDOR 38.15 38.15
ESCALERA 23.90
SUB TOTAL 151.29 175.19
MODULO F1: 03 AULAS
06 AULAS 169.71 169.71
CORREDOR 45.60 45.60
ESCALERA 23.90
SUB TOTAL 215.31 239.21
MODULO F2: 04 AULAS
02 AULAS 113.14 113.14
CORREDOR 60.10 60.10
ASCENSOR 4.80
SSHH ALUMNOS / HOMBRES 18.35 18.35
SSHH ALUMNOS / MUJERES 19.25 19.25
SUB TOTAL 210.84 215.64
MODULO F': COMPUTO+ACTIVIDADES LUDICAS
LUDICO 84.86
CORREDOR 25.71 25.71
PUENTE ASCENSOR 27.20
LABORATORIO DE COMPUTO 56.57
CRT 28.29
SUB TOTAL 110.57 137.77
PORTICO + CASETA DE CONTROL 48.00
SUB TOTAL 48.00
MODULO F3: 03 AULAS
06 AULAS 169.71 169.71
CORREDOR 45.60 45.60
SUB TOTAL 215.31 215.31

TALLERES Y BIBLIOTECAS 1,018.19 1,005.19 2,023.38


MODULO M: TALLERES + LABORATORIOS
LAB. DE FISICA 109.00
LAB. DE QUIMICA 109.00
01 TALLER DE COSMETOLOGIA 109.00
01 TALLER DE MANUALIDADES 109.00
ESCALERA 27.00

3
CUADRO DE AREAS TECHADAS

ITEM DESCRIPCION PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

CORREDOR 68.00 68.00


SUB TOTAL 286.00 313.00
MODULO L: TALLER + LABORATORIO
LAB. DE BIOLOGIA 109.00
01 TALLER DE HOSTELERIA 109.00
CORREDOR 26.50 26.50
CORREDOR BAÑO 19.00 19.00
SSHH ALUMNOS / HOMBRES 24.00 24.00
SSHH ALUMNOS / MUJERES 21.00 21.00
SSHH ALUMNOS / DISCAPACITADOS 5.40 5.40
SSHH PROFESORES / HOMBRES 4.18 4.18
SSHH PROFESORES / MUJERES 3.66 3.66
CUARTO DE LIMPIEZA 3.10 3.10
SUB TOTAL 215.84 215.84
MODULO K1: TALLERES
01 TALLER DE ELECTRICIDAD 109.00
01 TALLER DE CARPINTERIA 109.00
01 TALLER DE TURISMO 109.00
01 TALLER DE PERIODISMO 109.00
ESCALERA 27.00
CORREDOR 59.75 59.75
SUB TOTAL 277.75 304.75
MODULO K2: 02 BIBLIOTECAS
BIBLIOTECA PRIMARIA 109.00
BIBLIOTECA SECUNDARIA 109.00
CORREDOR 35.60 35.60
ESCALERA 27.00
SUB TOTAL 144.60 171.60
MODULO N: VESTUARIOS H-M
SSHH VESTUARIOS / HOMBRES 47.00
SSHH VESTURARIOS / MUJERES 47.00
SUB TOTAL 94.00

SERVICIOS COMPLEMENTARIOS 4,048.47 644.82 4,693.29


MODULO : CAPILLA ( 71 fieles )
CAPILLA 96.50
SUB TOTAL 96.50
MODULO : COMEDOR ( 150 comensales )
SALON COMEDOR 154.00
SSHH PÚBLICO / HOMBRES + CORREDOR 25.70
SSHH PÚBLICO / MUJERES 14.00

4
CUADRO DE AREAS TECHADAS

ITEM DESCRIPCION PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

SSHH PÚBLICO / DISCAPACITADOS 6.70


ATENCION + CORREDOR 16.75
COCINA 22.70
BOTADERO 6.20
DEPÓSITO 8.00
CAMARA DE FRÍO 9.70
SSHH PERSONAL 3.30
CASETA DE GAS 2.97
CUARTO DE LIMPIEZA 4.80
SUB TOTAL 274.82
MODULO : SUM ( 368 personas )
FOYER 62.60
ESCALERA 5.30
SSHH PÚBLICO / HOMBRES 10.30
SSHH PÚBLICO / MUJERES 12.90
SSHH PÚBLICO / DISCAPACITADOS 4.80
CONTROL DE SONIDO 11.40
SALÓN DE USOS MULTIPLES 287.00
KITCHET 7.40
ESCENARIO 58.25
CORREDOR TRAS ESCENARIO 20.40
SSHH HOMBRES 3.25
SSHH MUJERES 3.25
VESTIDOR / HOMBRES 10.15
VESTIDOR / MUJERES 10.15
KITCHENET 6.65
MEZZANINE 67.00
HALL DERECHO 9.70
DEPÓSITOS 4.60
SSHH / MUJERES 11.50
HALL IZQUIERDO 4.40
DEPÓSITO 7.90
SSHH / HOMBRES 11.20
SUB TOTAL 513.10 117.00
MODULO : ADMINISTRACION
TÓPICO 10.45
HALL 9.60
SECRETARIA 9.10
FOTOCOPIAS 9.00
ESPERA / DIRECCIÓN 10.15

5
CUADRO DE AREAS TECHADAS

ITEM DESCRIPCION PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

DIRECCIÓN GENERAL 15.30


S.H 2.60
ESPERA / SUB DIRECCIONES 14.87
SUB DIRECCIÓN PRIMARIA 13.50
SUB DIRECCIÓN GRAL. SECUNDARIA 17.20
AREA DE JEFATURA 57.80
MESA DE PARTES 9.70
CAJA 2.75
SIAGIE 16.10
SSHH PERSONAL / HOMBRES 5.90
SSHH PERSONAL / MUJERES 5.90
CORREDOR 7.85
ESCALERAS ( 2 ) 29.30
CORREDOR 78.30 78.30
APAFA 10.42
HALL 17.65
SECRETARIA 10.70
ESPERA 15.40
SUB DIRECCIÓN DE EDUCACIÓN 13.30
SUB DIRECCIÓN AREA ADMINISTRATIVA 17.20
SUB DIRECCIÓN ACADÉMICA PRIMARIA 17.25
PASTORAL 10.45
T.O.E. 10.45
PSICOLOGÍA 17.15
SALA DE PROFESORES PRIMARIA 30.00
SALA DE PROFESORES SECUNDARIA 30.50
SSHH PERSONAL / HOMBRES 5.90
SSHH PERSONAL / MUJERES 5.90
CORREDOR 7.85
PORTICO+CASETA DE CONTROL 90.45
SUB TOTAL 386.52 327.72
MODULO : POLIDEPORTIVO ( 908 personas)
LOSAS 1,662.10
GRADERIAS 615.87
DEPÓSITO GENERAL 26.25
MAESTRANZA 18.40
DEPOSITO 9.30
RAMPA DE SUBIDA A ESTRADO 19.00
ESTRADO 92.45
TÓPICO 18.70

6
CUADRO DE AREAS TECHADAS

ITEM DESCRIPCION PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

DPTO. DE EDUCACIÓN FÍSICA 8.70


ESCALERA 15.40
ALMACÉN 31.00
CORREDOR 13.70
DPTO. DE IMPLEMENTOS DEPORTIVOS 42.00
CTO, LIMPIEZA 3.15
SH DISCAPACITADOS 5.25
SSHH / MUJERES 19.25
VESTIBULO 17.60
DUCHAS / MUJERES 25.00
SSHH / HOMBRES 24.00
DUCHAS / HOMBRES 24.00
VESTIBULO 19.50
DEPOSITO 1 10.66
DEPOSITO 2 1.00
JUEGOS DE MESA 45.70
HALL 13.60
LUCES Y CONTROL DE SONIDO 18.70
OFICINA DE EDUCACION FISICA 18.70
HALL 13.60
JUEGOS DE MESA 89.80
SUB ESTACIÓN ELÉCTRICA 55.25
SUB TOTAL 2,777.53 200.10
CISTERNAS Y CUARTO DE BOMBAS 121.00
DEOSITO DE BASURA 17.20
SUB TOTAL 138.20

PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

SUB TOTAL POR PISO 8,139.99 4,770.12 1,041.73


PORCENTAJE DE MUROS Y COLUMNAS (25% ) 2,035.00 1,192.53 260.43
PORCENTAJE DE ALEROS ( 5% ) 407.00 238.51 52.09
AREA CONSTRUIDA TOTAL POR PISO 10,581.98 6,201.15 1,354.25 18,137.38

AREA CONSTRUIDA TOTAL 18,137.38


AREA DE TERRENO 20,114.95
AREA LIBRE 9,532.97

También podría gustarte