Está en la página 1de 13

GRUPO LXD S.A. DE C.V.

CUANTIFICACION BUENA VISTA 6


CHAPEO DE PIEDRA EN MUROS INTERIORES Y EXTERIORES
CDG/ CABO DEL SOL BV6
MUROS INTERIORES
PRIMER NIVEL
AREA LONGITUD ALTURA TOTAL
0.55 2.47 1.36
2.50 2.47 6.18
PAVILION
0.55 2.47 1.36
TOTAL 8.89
8.71 3.6 31.36
ESCALERAS Y 3.6 16.88
LIVING ROOM 4.69
TOTAL 48.24
0.70 3.60 2.52
KITCHEN 0.70 3.60 2.52
TOTAL 5.04
TOTAL MUROS INTERIORES PRIMER NIVEL 62.17
SEGUNDO NIVEL
AREA LONGITUD ALTURA TOTAL
8.71 3.2 27.87
ESCALERAS Y 3.2 15.01
LIVING ROOM 4.69
TOTAL 42.88
TOTAL MUROS INTERIORES PRIMER NIVEL 42.88
TOTAL MUROS INTERIORES 105.05

MUROS EXTERIORES
CASITA
AREA AREA TOTAL
CASITA 1-1 6.02
CASITA 1-2 23.68
CASITA 1-3 13.86
CASITA 1
CASITA 1-4 11.71
CASITA 1-5 7.09
TOTAL 62.36
CASITA 2-1 49.65
CASITA 2-1 46.75
CASITA 2
CASITA 2-3 49.62
TOTAL 146.02
EAST ELEVATION
AREA AREA TOTAL
POOL EQUIPMENT 1 27.83
POOL EQUIPMENT 2 14.06
EAST GAS TANK 1 17.83
ELEVATION GAS TANK 2 19.62
MURO EXTERIOR 5,6,7 3.32
TOTAL 82.66
MUROS EXTERIORES
WEST ELEVATION
AREA AREA TOTAL
MURO EXTERIOR 25.14
WEST EXTERIOR SHOWER 7.56
ELEVATION WEST ELEVATION 34.20
TOTAL 66.90
NORTH ELEVATION
AREA AREA TOTAL

NORTH NORTH ELEVATION 75.18


ELEVATION
TOTAL 75.18
SOUTH ELEVATION
AREA AREA TOTAL
SOUTH ELEVATION 1 84.57
SOUTH POOL DECK 11.79
ELEVATION
TOTAL 96.36

TOTAL DE MUROS INTERIORES 105.05


TOTAL DE MUROS EXTERIORES 529.48
GRUPO LXD S.A. DE C.V.
EXPLOSION DE INSUMOS
OBRA: OFICINAS ADMINISTRATIVAS GRUPO LXD
PARTIDA: CONCRETOS
PARTIDA DE CIMENTACION
PARRILLA
TIPO LOCALIZACION
LARGO ANCHO ESPESOR
ELEMENTO ELEMENTO EJE
PRIMER
A-E 1/9 25.72 6.48 0.15
NIVEL
A- 9/8 3.33 - - 0.53
9 - A/E 6.33 - - 1.0128
ZC-01 A - 8/7 3.25 0.52
A - 7/6 2.95 0.472
A - 6/5 3.25 0.52
5 - A/E 6.36 1.02
E- 5/6 3.25 0.52
E- 6/7 2.95 0.47
E - 7/8 3.25 0.52
E - 8/9 3.33 0.53
ZC-02 8 - E/C 1.93 0.31
8 - B/A 3.42 0.55
7 - B/A 3.42 0.55
LOSA 7 - E/D 1.03 0.16
CIMENTACION
6 - B/A 3.42 0.55
6 - E/C 1.93 0.31
C - 5/6 3.25 0.39
B - 5/6 3.25 0.39
ZC-03
B - 6/7 2.95 0.35
B - 7/8 3.25 0.39
1.20 0.24
ZA-01 1.00 0.20
PRIMER NIVEL
C30X30 1.00 0.20
1.00 0.20
1.20 0.24
ZA-01 1.00 0.20
PRIMER NIVEL
C2 20X30 1.00 0.20
1.00 0.20
TOTAL

PARTIDA DE CASTILLOS Y COLUMNAS


TIPO LOCALIZACION
ELEMENTO LARGO ANCHO ESPESOR PZAS
ELEMENTO EJE
K PRIMER NIVEL 4.25 0.10 0.15 4.00
K1 PRIMER NIVEL 4.25 0.15 0.15 25.00
C 15X60 PRIMER NIVEL 4.25 0.15 0.6 2.00
C2 20X30 PRIMER NIVEL 4.25 0.20 0.30 6.00
C 30X30 PRIMER NIVEL 4.25 0.3 0.3 5.00
CASTILLOS Y CASTILLOS Y COLUMNAS PRIMER NIVEL
COLUMNAS K SEGUNDO NIVEL 4.00 0.10 0.15 3.00
K1 SEGUNDO NIVEL 4.00 0.15 0.15 17.00
C 15X60 SEGUNDO NIVEL 4.00 0.15 0.6 4.00
C2 20X30 SEGUNDO NIVEL 4.00 0.20 0.30 16.00
CASTILLOS Y COLUMNAS SEGUNDO NIVEL
TOTAL DE CONCRETO PARA CIMENTACION

PARTIDA DE LOSAS

TIPO LOCALIZACION LARGO ANCHO ESPESOR CASETON


ELEMENTO EJE
ELEMENTO
LOSA PRIMER NIVEL 25.4 6.16 0.2 258.00
T1 15X25 PRIMER NIVEL 0.85 0.15 0.25 0.00
T2 15X45 PRIMER NIVEL 2.60 0.15 0.45 0.00
1.21 0.30 0.25 0.00
T3 30X25 PRIMER NIVEL
3.05 0.30 0.25 0.00
5.26 0.25 0.45 0.00
T5 25X45 PRIMER NIVEL
3.81 0.25 0.45 0.00
3.26 0.25 0.45 0.00
T6 25X45 PRIMER NIVEL 3.00 0.25 0.45 0.00
LOSAS 1.56 0.25 0.45 0.00
TOT
LOSA SEGUNDO NIVEL 22.36 5.81 0.2 249.00
0.95 0.15 0.25 0.00
T1 15X25 SEGUNDO NIVEL
3.05 0.15 0.25 0.00
3.61 0.15 0.45 0.00
T2 15X45 SEGUNDO NIVEL
1.70 0.15 0.45 0.00
T4 40X25 SEGUNDO NIVEL 6.16 0.40 0.25 0.00
TOTA
TOTAL

CONCEPTO

NOTA: EN ESTA CUANTIFICACION NO ESTA CONSIDERO EL CONCRETO DE ESCALERA YA QUE NO SE CUENTA CON EL PLANO D
25 de mayo de 2021

PARTIDA DE CIMENTACION
DALA DE LOSA DE TOTAL DE
CONTRATRABE P.U SUB TOTAL
DESPLANTE CIMENTACION CEMENTO

25.00
25.00
0.17 0.10 0.81
0.33 0.19 1.54
0.17 0.10 0.79
0.15 0.09 0.72
0.17 0.10 0.79
0.33 0.19 1.54
0.17 0.10 0.79
0.15 0.09 0.72
0.17 0.10 0.79
0.17 0.10 0.81
0.10 0.06 0.47
0.18 0.10 0.83
0.18 0.10 0.83
0.05 0.03 0.25
0.18 0.10 0.83
0.10 0.06 0.47
0.17 0.10 0.66
0.17 0.10 0.66
0.15 0.09 0.60
0.17 0.10 0.66
0.19 0.43
0.16 0.36
0.16 0.36
0.16 0.36
0.07 0.31
0.06 0.26
0.06 0.26
0.06 0.26
TOTAL DE CONCRETO PARA CIMENTACION 47.44 $ 1,852.00 $87,854.43

OS Y COLUMNAS
TOTAL DE
P.U SUB TOTAL IMPORTE
CONCRETO
0.26
2.39
0.77
1.53
1.91
OLUMNAS PRIMER NIVEL 7.54 $ 1,852.00 $ 13,961.19 $16,194.98
0.18
1.53
1.44
3.84
UMNAS SEGUNDO NIVEL 7.69 $ 1,852.00 $ 14,240.03 $16,518.43
15.23 $ 1,852.00 $ 28,201.21 $32,713.41

PARTIDA DE LOSAS

PZAS DESCUENTOS DESCUENTO LOSA DE TOTAL DE P.U. SUB TOTAL


ESCALERA CIMENTACION CEMENTO

0.00 -18.58 -7.86 31.29 4.86


5.00 0.16
1.00 0.18
2.00 0.18
1.00 0.23
1.00 0.59
1.00 0.43
1.00 0.37
1.00 0.34
1.00 0.18
TOTAL CONCRETO LOSAS PRIMER NIVEL 8.25 $ 1,852.00 $15,284.81
0.00 -17.93 0.00 25.98 8.05
5.00 0.18
5.00 0.57
1.00 0.24
1.00 0.11
4.00 2.46
TOTAL CONCRETO LOSAS SEGUNDO NIVEL 12.79 $ 1,852.00 $23,686.00
TOTAL DE CONCRETO PARA CIMENTACION 21.04 $ 1,852.00 $38,970.81

CANTIDAD P.U SUB TOTAL


CASETON PRIMER NIVEL 258.00 $ 62.64 $16,161.12
CASETON SEGUNDO NIVEL 249.00 $ 62.64 $15,597.36
TOTAL DE CASETON 0.60X0.60X0.20 507.00 $ 62.64 $31,758.48

QUE NO SE CUENTA CON EL PLANO DE ARMADO, SOLO UN PEQUEÑO DETALLE.


0.00
IMPORTE

$ 101,911.14
IMPORTE

$ 17,730.37

$ 27,475.77
$ 45,206.14

IMPORTE
$ 18,746.90
$ 18,092.94
$ 36,839.84
GRUPO LXD S.A. DE C.V.
EXPLOSION DE INSUMOS
OBRA: OFICINAS ADMINISTRATIVAS GRUPO LXD
PARTIDA: BLOCK
PARTIDA DE MUROS DE BLOCK PRIMER NIVEL
TIPO LOCALIZACI AREA DE AREA DE
ELEMENTO LARGO ALTO MUROS
ELEMENTO ON EJE BLOCK MURO
11.97 3.35 0.08 40.10 2.00
6.16 3.35 0.08 20.64 2.00
2.00 3.35 0.08 6.70 1.00
PRIMER 1.00 3.35 0.08 3.35 4.00
MB-01
MUROS NIVEL 2.95 3.35 0.08 9.88 3.00
1.60 3.35 0.08 5.36 3.00
0.90 3.35 0.08 3.02 2.00
1.85 3.35 0.08 6.20 1.00
TOTAL DE BLOCK

PARTIDA DE MUROS DE BLOCK SEGUNDO NIVEL


TIPO LOCALIZACI AREA DE AREA DE
ELEMENTO LARGO ALTO MUROS
ELEMENTO ON EJE BLOCK MURO
0.75 3.70 0.08 2.78 1.00
1.6 3.70 0.08 5.92 1.00
1.45 3.70 0.08 5.37 1.00
0.90 3.70 0.08 3.33 1.00
16.05 3.70 0.08 59.39 1.00
22.36 3.70 0.08 82.73 1.00
SEGUNDO 0.40 3.70 0.08 1.48 2.00
MB-01
MUROS NIVEL 5.33 3.70 0.08 19.72 1.00
2.15 3.70 0.08 7.96 1.00
1.50 3.70 0.08 5.55 2.00
1.15 3.70 0.08 4.26 2.00
3.24 3.70 0.08 11.99 2.00
1.60 3.70 0.08 5.92 2.00
0.55 3.70 0.08 2.04 2.00
TOTAL DE BLOCK

SUB TOTAL DE B
PORCENTA
SUB TOTAL DE B

NOTA: EN ESTA CUANTIFICACION NO ESTA CONSIDERO EL BLOCK DE ESCALERA YA QUE NO SE CUENTA CON EL PLANO D
25 de mayo de 2021

TOTAL DE AREA DE
BLOCK MURO
1002.49 80.20
515.90 41.27
83.75 6.70
167.50 13.40
370.59 29.65
201.00 16.08
75.38 6.03
77.47 6.20
2494.08 199.53

TOTAL DE AREA DE
BLOCK MURO
34.69 2.78
74.00 5.92
67.06 5.37
41.63 3.33
742.31 59.39
1034.15 82.73
37.00 2.96
246.51 19.72
99.44 7.96
138.75 11.10
106.38 8.51
299.70 23.98
148.00 11.84
50.88 4.07
3120.49 249.64 MORTERO PARA PEGADO DE BLOCK
449.17 2 m2/ bulto 225 5.61
6BTS/BULTO 1347.50 26.95

SUB TOTAL DE BLOCK f*m= 60 kg/cm2 5615


PORCENTAJE DE DESPERDICIO 5% 281
SUB TOTAL DE BLOCK f*m= 60 kg/cm2 5895

E CUENTA CON EL PLANO DE ARMADO, SOLO UN PEQUEÑO DETALLE.


GRUPO LXD S.A. DE C.V. 25 de mayo de 2021
EXPLOSION DE INSUMOS
OBRA: OFICINAS ADMINISTRATIVAS GRUPO LXD
PARTIDA: COSTO DE MATERIALES

OFICINAS PRIMER NIVEL


CLAVE CONCEPTO UNIDAD CANTIDAD PRECIO. UNIT
OBRA CIVIL
AC-3/8 ACERO DE REFUERZO fY= 4200 kg/cm2 VAR 3/8" KG 2861.00 $ 21.79
AC-1/2 ACERO DE REFUERZO fY= 4200 kg/cm2 VAR 1/2" KG 573.00 $ 21.79
AC-5/8 ACERO DE REFUERZO fY= 4200 kg/cm2 VAR 5/8" KG 490.00 $ 21.79
AC- 1/4 ACERO DE REFUERZO fY= 4200 kg/cm2 ALAMBRON KG 896.00 $ 20.95
AC-CAL.16 ALAMBRE RECOCIDO CAL- 16 KG 241.00 $ 39.90
AC-MALLA TELA MAYALAC C-10 66-1010 M2 230.00 $ 31.50
PLAST-NGO PLASTCO NEGRO CAL. 600 300 M2 ROLLO 1.00 $ 1,677.59
CONC-250 CONCRETO F`c= 250 KG/CM2 A 28 DIAS REV. 14 M3 64.00 $ 1,852.00
CONC-250B BOMBEO DE CONCRETO M3 64.00 $ 210.00
CAS-01 CASETON 0.60 X 0.60 X 0.20 PZA 260.00 $ 62.64
BLOCK-80 BLOCK 15 X 20 X 40 RESITENCIA 80 PZA 2500.00 $ 11.25
CEM-GRIS50 CEMENTO GRIS HOLSIM APASCO SACO 50KG BULTO 100.00 $ 226.68
AR-NML ARENA NORMAL M3 12.00 $ 200.00
25 de mayo de 2021

$ 324,261.05
IMPORTE

$ 62,341.19
$ 12,485.67
$ 10,677.10
$ 18,771.20
$ 9,615.90
$ 7,245.00
$ 1,677.59
$ 118,528.00
$ 13,440.00
$ 16,286.40
$ 28,125.00
$ 22,668.00
$ 2,400.00