Está en la página 1de 15

Distribuition Process Optimisation

DPO - Glob

Select Pillar:

Management People Dist. Planning

Delivery Fleet
ess Optimisation
DPO - Global Checklist

Dist. Planning Warehouse

eet Safety
Questionnaire - Management Pillar 73%
2nd. Calculate the score accoring to the "Scoring" and insert it in this column (or in column N). 1st. Insert in this column (or in colum
Reporting Period: Mandatory: 1 73% 64% O) YES or NO, according to each
requirement.
Facility Name: 64%

Question
Mandator ID Question/Topic Requirement How to Check Scoring Guidance Global Owner Feedback Playsheet MAZ WH - DDC WH - DDC DEL - DDC DEL - DDC DDC
Weight
y
MANAGEMENT PILLA 60% N/A 60%
FUNDAMENTALS 60% N/A 60%
1.0 STRATEGY 60% N/A 60%
R1.1.1 - Empleados capacitados en las 1. Verifique los registros de capacitación
Políticas de Cumplimiento. para las Políticas de cumplimiento. Nota:
Para el personal de 3PL, solo el
conocimiento del Canal de Cumplimiento
(línea de ayuda de denuncia de
irregularidades) y el procedimiento son YES YES
obligatorios.
2. Verifique si existe una línea de ayuda y si
se comunica adecuadamente a todos los
empleados (la línea de ayuda debe
publicarse visualmente). - Entrenamiento en: código de conducta, linea ética, compliance (entrenamientos en
3. Compruebe si los empleados conocen el Workday para equipo ABI) - (Equipo tercero por DPO Academy).
R1.1.2 - Línea de ayuda establecida y
Canal de cumplimiento o cómo pueden - Material de entrenamiento y revisión de plan de capacitaciones (validar en las guias de
debidamente comunicada a todos los
escalar posibles violaciones de cualquiera SKAP).
empleados.
de las Políticas globales obligatorias de la - Entrevistas a equipos mandos medios y primera linea.
empresa. Es aceptable que los empleados 5 - Todos los requisitos YES YES
escalen los problemas al Departamento de cumplidos. '- Publicación de números de linea de ayuda/ética
Las Políticas Globales de la Compañía son
Personas o a su gerente, además de utilizar - Entrevistas a equipos mandos medios y primera linea.
definidas por los principales líderes de la
el Canal de Cumplimiento. 3 - Además, R1.1.3 cumplió. - Flujo o canal de comunicación sobre incumplimientos a las políticas globales (Los
empresa y se vuelven obligatorias de
Yes 1.1 Conformidad 4. Solicite ver el registro de acciones para mencionados lineas arriba) 1 3 N/A 3.0
R1.1.3 - Empleados conscientes del Canal de inmediato. Son reglas que se establecen como
las acciones de Auditoría Interna y Zona o 1 - R1.1.1 y R1.1.2
Cumplimiento o de cómo pueden escalar producto de creencias, valores y experiencias
Auditoría Global/visita. Verifique que los cumplieron. '- Flujo o canal de comunicación sobre incumplimientos a las políticas globales (Los
posibles violaciones de cualquiera de las ligadas al Sueño de la empresa.
elementos se hayan completado de manera mencionados lineas arriba) - Opcional: la publicación del flujo
Políticas Globales de Empresa obligatorias. oportuna (como mínimo, "oportuno" se 0 - Sin R1.1.1 o R1.1.2. - Entrevistas a equipos mandos medios y primera linea.
define como dentro del mismo año YES YES
calendario para los elementos de auditoría '- Validar con people el listado de casos sobre incumplimiento de politicas globales en el año
interna, y para la próxima auditoría de zona en curso.
para la mayoría de las acciones de - Estatus de casos, que se hayan cerrado a nivel PAIS, ZONA Y GLOBAL
visita/auditoría de zona/global a menos que - Revisión de action log de eventos reportados a través del flujo de comunicación
R1.1.4 - Las acciones de auditoría Interna y se acuerde lo contrario entre la instalación y
auditoría/visita de Zona o Global se han el equipo de auditoría/visitante de
completado de manera oportuna. Zona/Global.

N/A N/A

R1.2.1 - Revisión de DC Dream realizada 1. Verifique la revisión del Sueño del CD.
anualmente o actualizada si se produjo una Debe revisarse anualmente o actualizarse si
interrupción importante en el negocio. se produjo una interrupción importante en el
negocio o si las condiciones internas /
externas cambiaron.
2. Verifique una declaración clara de sueño, N/A N/A
los KPI seleccionados y la conexión con la
estrategia de ABI.
3. Verifique el tablero de la sala de equipo
para la comunicación de Sueño del CD. - Realizar un comparativo del performance de los KPI sueño del año anterior VS meta actual
4. Hable con los miembros del equipo en para los 03 negocios
R1.2.2 - DC Dream con una declaración clara todos los niveles del departamento para
de Dream y un conjunto de KPI definidos. - Construcción del sueño del CD (tomando en cuenta los 03 negocios)
medir su conocimiento y comprensión del - Solo se debe publicar un sueño para todas las salas del CD
Sueño del CD. - Asegurar la actualización del sueño con el mindset 100%

'- Definir sueño para cada negocio dentro del toolkit del ciclo de gestión (delivery, warehouse N/A N/A
y fleet)
- Definir un solo sueño como CD pero aliementandose de los otros 3 negocios
5 - Todos los requisitos
- Definir KPIs del año que conecten con los 3 negocios
cumplidos.
-Los Dream KPIs, deben ser aspiracionales y - Sueño con un alcance definido
realistas (alineados y complementarios a los - KPI PATH (CONSOLIDADO DE KPIS EN BASE EL EJEMPLO GLOBAL - FOCO EN DOS
3 - Además, R1.2.3 y R1.2.4
objetivos anuales). Además, deben estar NEGOCIOS)
Definición del R1.2.3 - DC Dream conectado a la estrategia cumplieron.
1.2 conectados con la estrategia ABI y ser 1 N/A N/A N/A
Sueño de ABI. comunicados a todo el equipo. ' - Definir el sueño sin dejar de lado el foco de la compañía para el año en curso desde sus N/A N/A
1 - R1.2.1 y R1.2.2
diferentes negocios
cumplieron.
DPO.MGT.1.2 SUEÑO.docx
R1.2.4 - DC Dream comunicado a los '- Se cascadea un único sueño en el CD a todo nivel
0 - Sin R1.2.1 y R1.2.2.
empleados. - Validar por medio de entrevistas el conocimiento acerca del sueño en los diferentes niveles
- Validar como cada miembro de la operación desde su rol tiene impacto hacia el logro del
sueño
N/A N/A
' - Realizar un analisis comparativo de KPIs del sueño a nivel BU, ZONA o Global
(dependiente el alcance del sueño que define cada CD)
- Los KPIs del sueño deben ser mas retadores que lo Target del año en curso
- Definir LES anuales para los KPIs del sueño, hasta el horizonte fijado (año en que se
R1.2.5 - Benchmark definido para Dream KPIs. cumplira el sueño)
Definir los KPI de ensueño, deben ser
aspiracionales y realistas (alineados y
complementarios a los objetivos anuales).
N/A N/A

R1.3.1 - Objetivos estratégicos definidos 1. Verifique la definición y priorización de


mediante el análisis FODA. objetivos estratégicos utilizando tanto el
Análisis FODA como el Análisis So What N/A N/A
(DPO. MGT.3.1 Plantilla DAFO.xlsx). Las Acciones Estratégicas pueden
- Definición del FODA por cada negocio
2. Evaluar si los objetivos estratégicos están 5 - Todos los requisitos desencadenar un Proyecto o un PDCA que
- Definición de un FODA único para el CD
R1.3.2 - Objetivos estratégicos priorizados abordando los principales obstáculos para cumplidos. debe iniciarse para mejorar los resultados
- Asegurar el FODA tenga sustento cuantitativo
utilizando el Análisis So What. lograr el Sueño. mediante la mejora de productos o procesos.
Definición de N/A N/A
3. Comprobar que los resultados del So 3 - Además, R1.3.2 cumplió. Corresponde al liderazgo definir y priorizar las
1.3 Objetivos '- Definición de estrategias del CD 1 N/A N/A N/A
What Abakysis definen los proyectos, Belts, acciones estratégicas. (ver Temas 4.4 y 4.6)
Estratégicos R1.3.3 - Objetivos estratégicos que abordan - Ejecutar matriz de priorización CD
gastos de CAPEX, Cascadeo de metasy/o 1 - R1.3.1 cumplió.
los principales obstáculos para alcanzar el DPO.MGT.1.3 Instrucciones FODA.pptx
Sueño. ejercicio PDCA en los que va a participar el '- Definir lista de proyectos ejecutables en el año (al menos uno debe ser PDCA
DC. 0 - Sin R1.3.1. DPO.MGT.1.3 Plantilla DAFO.xlsx
ESTRATEGICO). Conectar con los KPIs criticos en cada nivel N/A N/A
DAFO.mp4.

2.0 BUSINESS AND PROCESSES MAPPING N/A N/A N/A


R2.1.1 - Revisión de la descripción del negocio 1. Compruebe si se actualizó la descripción
realizada anualmente o cuando cambian los del negocio y si se siguió el estándar global
requisitos del cliente, surgen nuevos desafíos (SIPOC).
o después de una interrupción del negocio. 2. Busque la alineación de proveedores y
clientes, procesos y recursos que coincidan
con el estado actual. N/A N/A
Verifique que los procesos enumerados
cumplan con la definición del proceso: "Un
proceso es cualquier MEDIO que
transforma los insumos en productos o
servicios que satisfagan las necesidades de
los clientes". El proceso descrito puede ser
de cualquier naturaleza: un proceso de
fabricación, administrativo o de servicio
Compruebe que está claro dónde comienza
y termina un proceso con entradas definidas
específicas y la salida deseada.
3. Verificar si la Matriz de Productos Críticos - Revisar la descripción del negocio del año anterior y evaluar si hubo algún cambio o
fue elaborada de acuerdo con las actualizaiones en los procesos de acuerdo al herramienta SIPOC
orientaciones adecuadas. Tenga en cuenta - Construcción del BD (para cada negocio) en base a la revisión ejecutada previamente
que la criticidad se mide en función del durante el Q1 y cuando se tengan actualizaciones asegurar que esto se refleje en el BD
impacto de los resultados de LY y la
posibilidad de comprometer la estrategia a '- Asegurar el estandar de acuerdo a la herramienta SIPOC
1. Compruebe si se actualizó la descripción
del negocio y si se siguió el estándar global
(SIPOC).
Questionnaire - Management Pillar 2. Busque la alineación de proveedores y 73%
clientes, procesos y recursos que coincidan 2nd. Calculate the score accoring to the "Scoring" and insert it in this column (or in column N). 1st. Insert in this column (or in colum
Reporting Period: con el estado actual. Mandatory: 1 73% 64% O) YES or NO, according to each
Verifique que los procesos enumerados requirement.
Facility Name: 64%
cumplan con la definición del proceso: "Un
proceso es cualquier MEDIO que
transforma los insumos en productos o
servicios que satisfagan las necesidades de Question
Mandator ID Question/Topic Requirement How to Check Scoring Guidance Global Owner Feedback Playsheet MAZ WH - DDC WH - DDC DEL - DDC DEL - DDC DDC
los clientes". El proceso descrito puede ser Weight
y
R2.1.2 - Revisión de la descripción del negocio de cualquier naturaleza: un proceso de
realizada de acuerdo con el estándar global fabricación, administrativo o de servicio
(SIPOC). Compruebe que está claro dónde comienza
y termina un proceso con entradas definidas
específicas y la salida deseada.
3. Verificar si la Matriz de Productos Críticos - Revisar la descripción del negocio del año anterior y evaluar si hubo algún cambio o N/A N/A
fue elaborada de acuerdo con las actualizaiones en los procesos de acuerdo al herramienta SIPOC
orientaciones adecuadas. Tenga en cuenta - Construcción del BD (para cada negocio) en base a la revisión ejecutada previamente
que la criticidad se mide en función del durante el Q1 y cuando se tengan actualizaciones asegurar que esto se refleje en el BD
impacto de los resultados de LY y la
posibilidad de comprometer la estrategia a '- Asegurar el estandar de acuerdo a la herramienta SIPOC
largo plazo. Los KPI se correlacionaron
R2.1.3 - SLA correctamente definidos de adecuadamente con productos críticos. Business Description (BD) es la descripción de '- SLAs criticos definidos (Max 2 por cada negocio: WH, DEL, FL) para cada negocio con
acuerdo con los Proveedores y existe una 4. Verifique la comunicación de la cómo cada Función o Departamento agrega acuerdos SMART
5 - Todos los requisitos
clara propiedad por parte del cliente y el Descripción del Negocio y de su importancia cumplidos. valor a la Organización. Ayuda a comprender - Revisar ( firmar) acuerdos al menos una vez al año si no hubieran cambios en los acuerdos
proveedor. para la operación (por ejemplo, correo los procesos de transformación completados y KPIs
electrónico, tableros visuales o reuniones). 3 - Además, R2.1.3, R2.1.4 y por cada operación para garantizar que - Revisar matriz de SLAs (no solo los criticos) y acciones para mejorar el resultado (cruzar
5. Entrevistar a los empleados para verificar R2.1.5 cumplieron. estamos entregando los productos correctos a con pilar planning)
Business N/A N/A
2.1 su conocimiento de la Descripción del nuestros clientes. 1 N/A N/A N/A
Description
Negocio, los KPIs, así como su importancia 1 - R2.1.1 y R2.1.2 '- Correr la matriz de criticidad para el producto critico
para la operación. DPO.MGT.2.1 Descripción comercial.docx - Validar que el criterio utilizado sea en base a eventos ya ocurridos y no por ocurrir
cumplieron.
6. Averigüe qué SLA existen, por qué se DPO.MGT.2.1 Plantilla de descripción - Validar cuantitativamente que los resultados en cada uno de los criterios exista el sustento
establecieron y cómo se realiza un comercial v1.0.xlsx de porque el puntaje.
0 - Sin R2.1.1 y R2.1.2
seguimiento. Asegúrese de que el equipo Descripción del negocio.mp4 - Reevaluar cuando dentro de una de las matrices de ciriticidad son arroja el mismo puntaje
R2.1.4 - Matriz de Productos Críticos no realice un seguimiento de los SLA solo SLA s.mp4 en el critico (solo cirtico).
elaborada de acuerdo con las orientaciones para realizar un seguimiento de los SLA.
adecuadas. Busque acciones de seguimiento '- Revisar que los KPIs del producto critico esten correlacionados con el proceso en si
provenientes de incumplimientos de SLA.
'- Asegurar que el equipo operativo conozca y haya participado de la elaboración del BD
(FOCO EN LOS EQUIPOS AUTONOMOS)
- Entrevistar al equipo operativo y lideres para validar el conocimiento del BD (clientes, N/A N/A
proveedores, procesos y KPIs)

R2.1.5 - KPI correctamente correlacionados


con productos críticos de la Descripción del N/A N/A
negocio.

R2.1.6 - Descripción del negocio, KPIs, y su


importancia para la operación debidamente
comunicada y empleados lo conocen.
N/A N/A

R2.2.1 - Mapeo de procesos realizado de 1. Comprobar si el Mapeo de Procesos se


acuerdo con el estándar global. realizó utilizando como referencia el
estándar global y si refleja la realidad de los N/A N/A
procesos críticos del área.
2. Compruebe si el Nivel 1 y el Nivel 2 del
R2.2.2 - Mapa de procesos que contiene todos Mapa de Procesos están correlacionados
los componentes debidamente definidos y que con el proceso de crítica definido en la
reflejan la realidad de los procesos críticos del descripción del negocio. N/A N/A
área. 3. Verifique si el Nivel 3 tiene las
R2.2.3 - Matriz de tareas críticas elaborada de Actividades correctamente definidas
teniendo en cuenta que una actividad es un Los mapas de proceso deben utilizarse
acuerdo con las orientaciones adecuadas. - Asegurar que el CD tenga el estandar del formato de global (DPO MGT 4.1)
grupo de tareas ordenadas con un principio cuando: N/A
y un final definidos donde los insumos se - Los resultados de un área no son estables
'- Asegurar que el CD tenga el mapa de procesos de cada negocio con visibilidad al
transforman en productos/servicios debido a la falta de tareas estandarizadas (bajo
producto, actividad y tarea critica
R2.2.4 - Identificar y comprender el rol de las intermedios (si están en la mitad de la 5 - Todos los requisitos control del proceso).
tareas críticas. cadena) o productos/servicios finales (si es cumplidos. - El equipo tiene diferentes entendimientos del
'- Validar la ejecución de las matrices de actividad y tarea critica con los criterios tomados en
el último de la cadena). flujo de tareas y cómo el proceso interactúa
el anterior bloque (BD) N/A N/A
4. Compruebe si el Nivel 4 tiene las tareas 3 - Además R2.2.2, R2.2.3 y con otras áreas.
2.2 Process Mapping correctamente definidas teniendo en cuenta R2.2.4 cumplieron. - Implementación de un nuevo proceso. 1 N/A N/A N/A
'- Enrenamiento sobre el de las tareas criticas de los negocios
que una tarea es un grupo de pasos - Estudiar un proceso de posibles mejoras con
1 - R2.2.1 cumplió. el fin de reducir el desperdicio o eliminar
R2.2.5 - Los PI se correlacionan correctamente ordenados que describen QUÉ hacer y NO '- Revisar que los KPIs y Pis se relacionen con las actividades y tareas criticas
actividades sin valor agregado.
con las tareas críticas del mapa de procesos. CÓMO hacerlo.
5. Verifique si el mapa de procesos contiene 0 - Sin R2.2.1. '- Asegurar que el equipo operativo conozca y haya participado de la elaboración del MP
la matriz de tareas críticas. Tenga en DPO.MGT.2.2 Mapeo de procesos.docx
(FOCO EN LOS EQUIPOS AUTONOMOS)
cuenta que la criticidad se mide en función DPO.MGT.2.2 Plantilla de mapa de procesos N/A N/A
- Entrevistar al equipo operativo y lideres para validar el conocimiento del MP (al menos
del impacto de los resultados de LY y la v01.xlsx
identificar la criticidad en cada nivel)
posibilidad de comprometer la estrategia a MapaDeProcesos.mp4
largo plazo. Verifique que los PI definidos
estén correctamente correlacionados con
R2.2.6 - Mapa de procesos, PIs, y su las tareas críticas.
importancia para la operación debidamente 6. Entrevistar a los empleados para verificar
comunicados y los empleados son conscientes su conocimiento de los Mapas de Procesos,
de ello. los PIs, así como su importancia para la N/A N/A
operación.

R2.3.1 - Árbol de KPI para el problema 1. Verifique los materiales del árbol de KPI
definido en el lugar que asigna la para verificar si se usaron al menos para los
responsabilidad adecuada a cada miembro del KPI críticos y si los PI y KPI estaban
equipo. correctamente vinculados;
2. Mostrar cómo las capas del árbol de KPI
se conectan con el MCRS: KPI mensuales / N/A N/A
semanales, algunos KPI y principalmente pi
Diarios/ SHO, PI en estaciones de trabajo
del operador, SICs integrados en los planes
de reacción y SOP en el OWS;
3. Compruebe si el equipo puede conectar
los elementos en los paneles Shiftly/Daily a
R2.3.2 - Árbol de KPI implementado utilizando los KPI en el panel mensual;
el concepto de KPI a PI a SIC para al menos 4. Es posible que no todos los KPI
los KPI críticos sin brechas en la selección de mensuales estén conectados a un elemento
KPI/PI efectivos para los tableros y estaciones del panel de control de Shiftly/Daily. Sin
de trabajo de Team Room. - Asegurar que el CD tenga el árbol de KPIs de cada negocio con visibilidad de los KPIs y
embargo, verifique los KPI mensuales rojos
Pis críticos.
tienen algo relacionado;
- Asegurar que el CD tenga un árbol de KPI´s considerando los 3 negocios N/A N/A
5. Verifique que para los PI de la estación El Bloque de Indicadores de Producto y
- SIC para los PI´s que son definidos como críticos en los diferentes árboles de KPIs
de trabajo los miembros de primera línea Proceso está enfocado a la definición de
- Matriz de correlación entre PI´s y KPI´s de tal manera que se pueda demostrar que los PI´s
tengan la capacidad de reaccionar a las mediciones, las cuales pueden ser
del nivel 4 al nivel 2 tienen un impacto en el nivel 1
excepciones y realizar cambios para que el consideradas KPIs o PIs dependiendo del
PI vuelva a tener el control. Si no, no es un alcance y punto de vista considerado. Estas
'- Rutinas alineadas al MCRS para seguimiento de KPI´s y PI´s
buen PI; definiciones son las salidas de este bloque. La
5 - Todos los requisitos - TOR de rutinas de seguimiento de KPI´s y PI´s
6. Entrevistar al empleado para verificar su verificación de estos indicadores es parte del
cumplidos. - Evidencia de planes de acción según desviaciones de KPI´s y PI´s resultantes de las
R.2.3.3 - Proceso de selección de PI conocimiento de los árboles de KPI, del Bloques de proceso de revisión de rutina y
rutinas de seguimiento y uso de SIC
implementado con una comprensión clara de vínculo entre PI, KPI y árboles de KPI, y su rendimiento discutidos más adelante. El
3 - Además, R2.3.4 cumplió. - Para SIC de la Workstation que ya se tienen definidas acciones ,se deben dejar evidecias
Product and los insumos que se utilizarán, la frecuencia importancia para la operación; desglose de un KPI en sus componentes PI y
Yes 2.3 de respaldo cuando se ejecutan. 1 N/A N/A N/A N/A
Process Indicator para revisar los PI a rastrear y quién está 7. Compruebe que se retira un KPI y/o PI y sus palancas SIC se puede visualizar en un
1 - R2.3.1, R2.3.2 y R2.3.3 - Revisar las desviaciones de las Workstation en las rutinas de cambio de turno.
involucrado en la discusión y las decisiones. se selecciona uno nuevo en función de los árbol de KPI. Si solo medimos los KPI en
cumplieron.
datos de rendimiento actualizados tan nuestro negocio, estamos midiendo los
'- Entrevistas al Front Line para validar conocmiento sobre:
pronto como se resuelvan los actuales. resultados cuando nuestros productos ya están
0 - Sin R2.3.1. * Conexión de PI´s y KPI´s
terminados. Esto es demasiado tarde para
* PI´s que se rastrean en las Workstation
hacer correcciones y resultaría en mucho
desperdicio y reelaboración.
'- KPI´s mensuales conectados o relacionados con algún PI diario
Mejoras de KPI´s o PI´s al menos 3 meses consecutivos para poder cambiar el PI o KPI
DPO.MGT.2.3 Ejercicio de ruta de KPI.pptx
Ajustar la meta del PI o KPI aplicando Minset 100%
DPO.MGT.2.3 Ejemplos de árbol de KPI.pptx"
'- Actualización del árbol de KPIs en base a la mejora que puedan ir presentado en el
resultados de los KPIs y Pis. (mindset 100%)
Pis críticos.
tienen algo relacionado;
- Asegurar que el CD tenga un árbol de KPI´s considerando los 3 negocios
5. Verifique que para los PI de la estación El Bloque de Indicadores de Producto y
- SIC para los PI´s que son definidos como críticos en los diferentes árboles de KPIs
de trabajo los miembros de primera línea Proceso está enfocado a la definición de
- Matriz de correlación entre PI´s y KPI´s de tal manera que se pueda demostrar que los PI´s
tengan la capacidad de reaccionar a las mediciones, las cuales pueden ser
del nivel 4 al nivel 2 tienen un impacto en el nivel 1
excepciones y realizar cambios para que el consideradas KPIs o PIs dependiendo del
PI vuelva a tener el control. Si no, no es un alcance y punto de vista considerado. Estas
Questionnaire - Management Pillar '- Rutinas alineadas al MCRS para seguimiento de KPI´s y PI´s 73%
buen PI; definiciones son las salidas de este bloque. La 2nd. Calculate the score accoring
5 - Todos los requisitos - TOR de rutinas de seguimiento de KPI´stoy the
PI´s"Scoring" and insert it in this column (or in column N). 1st. Insert in this column (or in colum
6. Entrevistar al empleado para verificar su verificación de estos indicadores es parte del
Reporting Period: cumplidos. Mandatory: 1 - Evidencia de planes de acción según desviaciones de KPI´s y PI´s resultantes de las 73% 64% O) YES or NO, according to each
conocimiento de los árboles de KPI, del Bloques de proceso de revisión de rutina y
rutinas de seguimiento y uso de SIC requirement.
Facility Name: vínculo entre PI, KPI y árboles de KPI, y su rendimiento discutidos más adelante. El 64%
3 - Además, R2.3.4 cumplió. - Para SIC de la Workstation que ya se tienen definidas acciones ,se deben dejar evidecias
Product and importancia para la operación; desglose de un KPI en sus componentes PI y
Yes 2.3 de respaldo cuando se ejecutan. 1 N/A N/A N/A
Process Indicator 7. Compruebe que se retira un KPI y/o PI y sus palancas SIC se puede visualizar en un
1 - R2.3.1, R2.3.2 y R2.3.3 - Revisar las desviaciones de las Workstation en las rutinas de cambio de turno.
se selecciona uno nuevo en función de los árbol de KPI. Si solo medimos los KPI en Question
Mandator ID Question/Topic Requirement How toactualizados
Check cumplieron.Scoring Guidance Global Owner Feedback Playsheet MAZ WH - DDC WH - DDC DEL - DDC DEL - DDC DDC
datos de rendimiento tan nuestro negocio, estamos midiendo los Weight
y '- Entrevistas al Front Line para validar conocmiento sobre:
pronto como se resuelvan los actuales. resultados cuando nuestros productos ya están
R.2.3.4 - Los miembros del equipo de primera 0 - Sin R2.3.1. * Conexión de PI´s y KPI´s
terminados. Esto es demasiado tarde para
línea entienden la conexión entre los KPI * PI´s que se rastrean en las Workstation
hacer correcciones y resultaría en mucho
mensuales y el tablero diario/de turnos en sus
desperdicio y reelaboración. N/A N/A
salas de equipos y hasta los PI que están '- KPI´s mensuales conectados o relacionados con algún PI diario
rastreando en sus estaciones de trabajo. Mejoras de KPI´s o PI´s al menos 3 meses consecutivos para poder cambiar el PI o KPI
DPO.MGT.2.3 Ejercicio de ruta de KPI.pptx
Ajustar la meta del PI o KPI aplicando Minset 100%
DPO.MGT.2.3 Ejemplos de árbol de KPI.pptx"
R2.3.5 - Definir el problema a resolver con '- Actualización del árbol de KPIs en base a la mejora que puedan ir presentado en el
base en el Sueño, análisis crítico a partir de la resultados de los KPIs y Pis. (mindset 100%)
ejecución del Ciclo de Gestión u otros criterios
de priorización.
N/A N/A

R2.3.5 - Nuevo enfoque o problema


identificado al estirar el objetivo de KPI o
debido a una brecha que debe cerrarse. En
caso de que el KPI mejore de manera
sostenible, establezca objetivos de N/A N/A
estiramiento para lograr el punto de referencia
o identifique un nuevo problema para resolver.

MANAGE TO SUSTAIN N/A N/A N/A


3.0 ROUTINE MANAGEMENT (SDCA) N/A N/A N/A
R3.1.1 - Los empleados tienen conocimiento y 1. Entreviste a una muestra de empleados 5 - Todos los requisitos N/A N/A
comprensión de los principios
R3.1.2 - Se implementa 5S la rutina 5S de diferentes áreas para verificar su
y ejecuta cumplidos. N/A N/A
conocimiento y comprensión de los 5S es una metodología para organizar, limpiar,
R3.1.3 - Existe un sistema digital/sin papel principios de 5S. Deben poder explicar la 3 - Además, R3.1.3 y R3.1.4 desarrollar y mantener un entorno de trabajo N/A N/A
- Dashboard de resultados de auditorias 5s (mantener misma tendencia en 12 meses,
para gestionar y ejecutar tareas 5S.
R3.1.4 - El plan de acción se encuentra en importancia de su rutina. (5S es la base cumplieron. eficiente y es la base para la productividad y un
imcorporando mindset 100%) N/A N/A
ejecución. para la productividad y 1. Entreviste a una facilitador de la eficiencia. Este método
- Planes acción de rutinas
muestra de empleados de diferentes áreas 1 - R3.1.1 y R3.1.2 cumplen. proporciona un enfoque fundamental y
R3.1.5 - Los resultados son visibles cuando - Plan de reconocimiento (programa/SOP) y despliegue a equipos a todo nivel
para verificar su conocimiento y sistemático para ser más productivo mientras
Yes 3.1 5S (Estandarizar) caminamos por el área. - Análisis de correlación de indicadores operativos (NO SOLO GKPIS) y 5s 1 N/A N/A N/A
comprensión de los principios de 5S. Deben 0 - Sin R3.1.1. se mejora la seguridad y la calidad.
- uso de 5s en ciclos SDCA
poder explicar la importancia de su rutina. - Checklist de 5s digitales (mínimo 1 evaluación por área 5s (layout 100%) al mes)
(5S es la base para la productividad y un DPO.MGT.3.1 5S.docx
- Auditorias de su propio sector y cruzadas por parte del equipo operativo (foco en nivel 4 de N/A N/A
habilitador de eficiencia) Auditoría 5S WH.xlsx
autonomia SKAP)
2. Camine por el área para observar la Lista de verificación de auditoría de flota
calidad de la ejecución de las 5S 5S.xlsx
3. Verifique la auditoría 5S. ¿Se realiza con
el apoyo de un sistema digital/sin papel?
R3.2.1 - Los SOP están establecidos para 1.
4. Verificar
Revisar losloscriterios
estándares paradel árealay los
definir 5 - Todos los requisitos
todas las tareas definidas como críticas registros/horarios
frecuencia de capacitación.
de las auditorías 5S. Si noVerificar
hay cumplidos.
durante el Mapeo de Procesos. si todas
una laspara
rutina tareas
5S,críticas tienen susal
debe ejecutarse
estándares,
menos una vezde acuerdo con losajustarse si
al mes. Podría 3 - Además, se cumplieron
lineamientos
no hay brechas globales.
importantes que cerrar. R3.2.3 y R3.2.4. N/A N/A
2. Los
5. Verificar que haya
elementos másuna revisión
grandes de los
o los
procedimientos
esfuerzos existentes
de mejora a másantes
largodeplazo 1 - R3.2.1 y R3.2.2 Estandarización significa establecer,
establecer
fuera uno nuevo.
del alcance del control de la línea del cumplieron. implementar y verificar el cumplimiento de los
3. El reentrenamiento
frente deben escalarsepara todos
dentro dellos
MCRS a procedimientos estándar.
empleados que utilizan un SOPun crítico debe 0 - Sin R3.2.1. -SOPs de Productos críticos a nivel proceso y tarea crítica (actualización en base al ciclo de
la sala del equipo para realizar Asegura resultados predecibles, que todas las
R3.2.2 - Los estándares son accesibles para seguimiento
realizarse dentro gestión anual) - Para cada negocio
en elde los 30de
registro días posteriores
acciones. actividades se realicen de la mejor y correcta
-Validar la existencia y ejecución del resto de SOPs que se encuentran en los demás pilares
todos los usuarios. a un
6. cambioque
Verifique o actualización
haya un punto delde
estándar. manera por todos los involucrados, garantiza la
4. Entreviste - Asegurar que el SOP tenga al menos los requisitos mencionados en la guia de este check
referencia deaWhat
los empleados
Good Looks deLike
todoen el retención del conocimiento y facilita la
list N/A N/A
departamento
cada para comprender
área y asegúrese de que elcómo
puntajeusan formación. Una lección de un punto (OPL) es
los SOP
refleje lasen sus rutinas, cómo
expectativas".un se usan de
habilitador los una descripción simple de una página de una
SOP durante las actividades de '-SOPs de Productos críticos a nivel proceso y tarea crítica (actualización en base al ciclo de
eficiencia) tarea, que generalmente incluye imágenes para
capacitación, quién está involucrado en su gestión anual)
2. Camine por el área para observar la ilustrar cómo completar la tarea.
R3.2.3 - Los miembros del equipo en todos los creación, cómo brindan comentarios sobre - Validar que no existan duplicidades entre SOPs
Estándares y calidad de la ejecución de las 5S
niveles del departamento han sido capacitados las actualizaciones necesarias, - Validar que se tenga trazabilidad dentro del mismo SOP al menos una vez año
3.2 capacitación 3. Verifique la auditoría 5S. ¿Secómorealizasaben
con Elementos de un Procedimiento Operativo 1 N/A N/A N/A
(estandarización) sobre las expectativas de los SOP críticos. si
el los
apoyoSOP dese unhan actualizado,
sistema etc.papel?
digital/sin . Estándar (SOP):
5. '- Despliegue de OPLs de los procesos criticos, validación en entrevistas y ejecución de N/A N/A
4. Verificar
Revisar losun criterios
proceso parapara definir
actualizar
la - Objetivo
procesos en todos los niveles (mandos medios y equipos operativos)
constantemente los estándares.
frecuencia de las auditorías 5S. Si no hay - Instrucciones de seguridad cuando
una rutina para 5S, debe ejecutarse al corresponda
'- OPL o instructivo para actualización o cambios en algún proceso
menos una vez al mes. Podría ajustarse si - Herramientas y recursos necesarios
R3.2.4 - Los miembros del equipo de primera - Validar en entrevistas el conocimiento de ese flujo por parte del equipo operativo
no hay brechas importantes que cerrar. - Referencia a Indicadores de Proceso
línea entienden el proceso para actualizar los5. Los elementos más grandes o los - Funciones y responsabilidades
estándares. '- Conexión del proceso con el KPI relacionado
esfuerzos de mejora a más largo plazo - Público objetivo
- Conocimiento a todo nivel sobre la relacion del SOP con su tarea y producto critico N/A N/A
fuera del alcance del control de la línea del - Descripción de tareas/pasos
- Acciones que impactan en la mejora del proceso (entrevistas)
frente deben escalarse dentro del MCRS a - Creador y aprobador
la sala del equipo para realizar un
DPO.MGT.3.2 SOP.docx.
R3.2.5 - Cada SOP crítico está conectado a un seguimiento en el registro de acciones.
PI y a los miembros del equipo de primera 6. Verifique que haya un punto de
línea. referencia de What Good Looks Like en
cada área y asegúrese de que el puntaje N/A N/A
refleje las expectativas"

R3.3.1 - Rutina para planificar la ejecución de 1. Los SOP para todas las tareas críticas
los OWD establecidos. deben revisarse anualmente utilizando un
OWD. Los SOP no críticos pueden N/A N/A
revisarse con una frecuencia más baja y no
necesariamente se revisan a través de un
OWD. El Diagnóstico Operacional de Trabajo (OWD) - Calendarizar la ejecución de las OWDs y asegurar el cumplimiento
R3.3.2 - Diagnóstico de trabajo operativo 2. Busque documentos y registros de OWD se utiliza para verificar si los operadores y - Validar en la MCL/SCL que se encuentren registrados las OWD de los procesos criticos y
(OWD) ejecutado para todos los para verificar si se han planificado conductores están ejecutando sus tareas de no criticos N/A N/A
procedimientos operativos estándar (SOP) correctamente y se ejecutan regularmente. 5 - Todos los requisitos acuerdo con los procedimientos estandarizados
críticos. Compare los OWD con todos los SOP cumplidos. establecidos. Las acciones que se deben tomar '- Validar la ejecución de las OWDs y % cumplimiento
R3.3.3 - Acciones correctivas adoptadas en priorizados, para asegurarse de que estén en caso de incumplimiento pueden incluir la
Diagnóstico del caso de incumplimiento según OWDs. completamente cubiertos. 3 - Además, R3.3.3 y R3.3.4 revisión estándar si es necesario, el reciclaje de '- Acciones provenientes de las desviaciones en el proceso
3. Verificar las acciones correctivas N/A N/A
Trabajo cumplieron. los empleados y la promoción de la conciencia
3.3 adoptadas en caso de incumplimiento de 1 N/A N/A N/A
Operacional del importancia del cumplimiento de las normas '- Ejecución de OWD en los diferenctes procesos que tengan el KPI desviado en al menos
(OWD) (Do) R3.3.4 - Los OWD se utilizan como una las DDO. 1 - R3.3.1 y R3.3.2 establecidas. una semana (la OWD es direccionada - donde esta el GAP)
herramienta de resolución de problemas para 4. Entreviste a los empleados para cumplieron. La nueva capacitación de todos los empleados - Conexión con el SDCA tracker (validar que la herramienta se este activando dentro de las
desviaciones individuales para ayudar a comprender si están ejecutando OWD que utilizan un SOP crítico debe realizarse rutinas operativas principalmente)
determinar la causa raíz de un problema. correctamente como herramientas de 0 - Sin R3.3.1. dentro de los 30 días posteriores a un cambio o N/A N/A
resolución de problemas para las actualización del estándar. '- Mejora de KPIs/PI relacionado al proceso o tarea - MCRS (SEMANAL) - se valida con el
desviaciones individuales, si se están KPI/PI con tendencia positiva
adoptando acciones correctivas y si se está DPO.MGT.3.2 OWD.docx. - Mejora en la adherencia del la OWD
R3.3.5 - La rutina OWD es efectiva y ayuda a proporcionando la retroalimentación
mejorar los KPI o PI adecuada para ejecutar las mejoras.
5. Verifique si los resultados de OWD se N/A N/A
están utilizando como una herramienta de
resolución de problemas para desviaciones
individuales.
R3.4.1 - Todas las reuniones obligatorias se 1. Verificar si todas las reuniones
están realizando de acuerdo con el Estándar obligatorias se llevan a cabo de acuerdo
Global. con el MCRS definido N/A N/A
(DPO.MGT.4.1.1.MCRS Standard.pdf);
2. Verificar el cumplimiento de todas las
reuniones obligatorias de acuerdo con los
R3.4.2 - Términos de referencia establecidos y TOR definidos (DPO.MGT.4.1.2.TOR El sistema de informes de control de gestión Verifique si todas las reuniones obligatorias se llevan a cabo de acuerdo con el MCRS
seguidos para todas las reuniones de acuerdo Standards.xlsx); (MCRS) proporciona una forma sistemática de definido (DPO. MGT.4.1.1.MCRS Standard.pdf);
con el Estándar Global. verificar los resultados. Un MCRS N/A N/A
3. Asegurarse de que las personas
adecuadas estén en las reuniones correctas cuidadosamente planificado y ejecutado puede '- Verificar la existencia de TOR para todas las rutinas (transversal con los otros pilares)
y que las reuniones se celebren en el 5 - Todos los requisitos reducir el volumen de reuniones, liberar tiempo
momento adecuado para que puedan cumplidos. para los empleados y, en general, mejorar la '- Action log de forma digital para todas las rutinas
Sistema de asistir; productividad. Es una rutina en turnos, diaria y - validar en la DPO APP
Control de 4. Comprobar que el objetivo definido para 3 - Además, R3.4.4 cumplió. semanalmente, que define acciones a tomar - Impacto positivo en KPIs/Pis de acuerdo a las acciones ejecutadas
Yes 3.4 Gestión y todos los KPI y PI es mejor que el objetivo cuando los resultados no son aceptables, y 1 N/A N/A N/A
Reporte (MCRS) LY; 1 - R3.4.1, R3.4.2 y R3.4.3 establece planes y estándares a seguir una vez '- Entrevista con el personal
(Verificar) 5. Verificar si existen planes de acción para cumplieron. que se alcancen los resultados. - Acompañamiento en campo para validar ejecucion de las rutinas bajo el liderazgo del
todas las reuniones y si las acciones están Este proceso garantiza que ABI mantenga y frontline.
debidamente definidas para corregir una 0 - Sin R3.4.1. mejore los resultados comerciales de la manera
desviación; más efectiva, fácil e inteligente. '- Validar debida actualizacion de los tableros en los diferentes Teams Rooms del CD.
7. Si se identifica un nuevo - Uso de Herramientas de Gestion ante las desviaciones presentadas y planes de accion en
problema/enfoque, asegúrese de incluir los DPO.MGT.3.4 Estándar MCRS.pdf lugar.
1. Verificar si todas las reuniones
obligatorias se llevan a cabo de acuerdo
Questionnaire - Management Pillar con el MCRS definido 73%
2nd. Calculate the score accoring to the "Scoring" and insert it in this column (or in column N). 1st. Insert in this column (or in colum
(DPO.MGT.4.1.1.MCRS Standard.pdf);
Reporting Period: Mandatory: 1 73% 64% O) YES or NO, according to each
2. Verificar el cumplimiento de todas las
requirement.
Facility Name: reuniones obligatorias de acuerdo con los 64%
TOR definidos (DPO.MGT.4.1.2.TOR El sistema de informes de control de gestión Verifique si todas las reuniones obligatorias se llevan a cabo de acuerdo con el MCRS
Standards.xlsx); (MCRS) proporciona una forma sistemática de definido (DPO. MGT.4.1.1.MCRS Standard.pdf);
3. Asegurarse de que las personas verificar los resultados. Un MCRS
Question
Mandator ID Question/Topic Requirement adecuadas estén HowentolasCheck
reuniones correctas Scoring Guidancey ejecutado puede
cuidadosamente planificado Global Owner Feedback Playsheet
'- Verificar la existencia de TOR para todas MAZ(transversal con los otros pilares)
las rutinas WH - DDC WH - DDC DEL - DDC DEL - DDC DDC
Weight
y y que las reuniones se celebren en el 5 - Todos los requisitos reducir el volumen de reuniones, liberar tiempo
R3.4.3 - Plan de acción establecido para todas cumplidos. para los empleados y, en general, mejorar la '- Action log de forma digital para todas las rutinas
momento adecuado para que puedan
Sistema de las reuniones y acciones debidamente productividad. Es una rutina en turnos, diaria y - validar en la DPO APP
asistir;
Control de definidas para corregir una desviación.
4. Comprobar que el objetivo definido para 3 - Además, R3.4.4 cumplió. semanalmente, que define acciones a tomar - Impacto positivo en KPIs/Pis de acuerdo a las acciones ejecutadas N/A N/A
Yes 3.4 Gestión y todos los KPI y PI es mejor que el objetivo cuando los resultados no son aceptables, y 1 N/A N/A N/A
Reporte (MCRS) LY; 1 - R3.4.1, R3.4.2 y R3.4.3 establece planes y estándares a seguir una vez '- Entrevista con el personal
(Verificar) cumplieron. que se alcancen los resultados. - Acompañamiento en campo para validar ejecucion de las rutinas bajo el liderazgo del
R3.4.4 - Los miembros del equipo de Primera 5. Verificar si existen planes de acción para Este proceso garantiza que ABI mantenga y frontline.
Línea dirigen sus reuniones de rutina. todas las reuniones y si las acciones están
debidamente definidas para corregir una 0 - Sin R3.4.1. mejore los resultados comerciales de la manera
más efectiva, fácil e inteligente. '- Validar debida actualizacion de los tableros en los diferentes Teams Rooms del CD. N/A N/A
desviación;
7. Si se identifica un nuevo - Uso de Herramientas de Gestion ante las desviaciones presentadas y planes de accion en
problema/enfoque, asegúrese de incluir los DPO.MGT.3.4 Estándar MCRS.pdf lugar.
R3.4.5 - Los paneles KPI/PI creados para KPI y/o PI correspondientes de acuerdo con DPO.MGT.3.4 TOR V1.1.xlsx. - Mejora de los KPI/PIs monitoreados en las rutinas.
todas las reuniones ayudan a mejorar el el Tema 4.1.
rendimiento.
N/A N/A

R3.5.1 - Disposición y componentes del puesto 1. Verifique que las estaciones de trabajo
de trabajo según norma. estén en su lugar de acuerdo con el
requisito mínimo descrito en el estándar
global.
2. Ejecute la lista de verificación de N/A N/A
Efectividad para nuevas implementaciones - Estaciones de trabajo fisicas/digitales en las diferentes areas requeridas.
o baja adherencia al estándar. - Estaciones de trabajo definidas en conformidad con el estandar global (correr check de
3. Verificar que cada área operativa del efectividad de OWS para validar adherencia).
Almacén cuente con una Estación de
R3.5.2 - Se incluyen todos los PI del proceso, Trabajo (ej.: Picking, Montacargas, Sorting, '- Garantizar que el PI monitoreado en la OWS de picking sea crittico para el proceso.
destacando los PI Críticos o de Foco. Repack, etc.).
4. Verifique que todos los elementos La estación de trabajo del operador (OWS) es '- Entrevista con el personal para validar conocimiento sobre la utilizacion de la OWS y como
obligatorios estén en su lugar para la un espacio diseñado deliberadamente dentro o les aporta en la ejecucion de sus tareas.
estación de trabajo crítica y de pinzamiento. 5 - Todos los requisitos junto al área de trabajo inmediata de un N/A N/A
5. Busque un ejemplo de mejora del operador. Involucre a los miembros del equipo '- Entrevista con el personal para verificar como desde la ejecucion de sus tareas aportan al
cumplidos.
rendimiento de un PI debido a la correcta de primera línea en la propiedad del proceso logro de los indicadores medidos por el CD.
implementación del plan de reacción. en el que participan conectando la estación de - Conocimiento de los miembros del equipo de trabajo sobre la conexion del PI monitoreado
3 - Además, R3.6.3 y R3.6.4
Workstations trabajo de operaciones con el resto del proceso dentro del SIC con las actividades que ejecutan de forma diaria.
Yes 3.5 cumplieron. 1 N/A N/A N/A
(Comprobar) R3.5.3 - Los miembros del equipo de primera de revisión de rutina .
línea entienden cómo usar la estación de '- Validar identificacion de las causas comunes que provocan la desviacion del indicador
1 - R3.5.1 y R3.5.2 cumplen.
trabajo. DPO.MGT.3.5 OWS.pptx monitoreado. N/A N/A
DPO.MGT.3.5.Estándares OWS.xlsx - Definir planes de reaccion para las zonas amarillas y rojas dentro del SIC (estos planes de
0 - Sin R3.5.1.
Eficacia OWS WH T2 ENG.xlsx reaccion deben conectar con las causas comunes previamente definidas).
Estaciones de trabajo DPO 2.0 - Entrega.pptx - Revisar actualizacion dinamica del indicador monitoreado en la OWS de picking en
R3.5.4 - Los miembros del equipo de primera Almacén de la estación de trabajo.mp4. confirmidad a la mejora en el desempeño del indicador.
línea entienden cómo impactan a los PI con - El PI critico definido para la OWS de Picking debe ser monitoreado tambien dentro de la
sus tareas diarias. rutina de Cambio de Turno.
- Implementar WS para delivery , sic , riesgos de seguridad , indicadores de delivery ( no
N/A N/A
mandatorio, pero debe de solicitarse fisico y/o digital )
- WS debe de estar dentro de unidades ( acceso permanente al conductor )
- WS mandatoria para todos los CD´s picking

R3.5.5 - El plan de reacción brinda claridad al


operador sobre qué hacer, lo que permite que N/A N/A
los resultados regresen a la zona verde.
R3.6.1 - Disposición de Salas de Equipos y 1. Verifique que las Salas de equipo estén
tableros según norma. en su lugar de acuerdo con el requisito
mínimo descrito en el estándar global y
2. Ejecute la lista de verificación de
Efectividad para nuevas implementaciones N/A N/A
o baja adherencia al estándar.
3. Los tableros físicos se pueden
reemplazar por digitales SOLAMENTE si los
datos se toman de un sistema o se vinculan
R3.6.2 - TOR definido en base al estándar y directamente al tablero digital. Observe una
seguido. reunión, si es posible, y verifique el uso - Distribucion de la sala de equipo este definida segun el estandar global (fisico o digital).
sólido del contenido visual aplicable (es N/A N/A
- Ejecutar check de efectividad de reuniones para validar adherencia al estandar global.
decir, el equipo NO debe depender - Garantizar que el llenado de los tableros respete la leyenda de colores definidas por el
únicamente de la pantalla/computadora). Una sala de equipo es un espacio donde el estandar global.
R3.6.3 - Crítico de Focus KPI/PI revisado en la 4. Busque un ejemplo de mejora del equipo puede reunirse para compartir y
reunión. rendimiento de un PI debido a la causa raíz analizar la información necesaria para la '- Asegurar que la ejecucion de las diferentes rutinas siga los lineamientos minimos de la
identificada en la Sala del equipo. resolución de problemas y la mejora continua TOR definida por global.
5 - Todos los requisitos
de manera efectiva, eficiente y sostenible. Las N/A N/A
cumplidos.
salas de equipo se utilizan para ejecutar la '- Seguimiento de los KPI/Pis criticos dentro de las diferentes rutinas del CD.
rutina y se han diseñado con un diseño - Plan de accion en lugar ante cualquier desviacion presentada.
3 - Además, se cumplieron
deliberado para facilitar las reuniones
Team Room R3.6.4 y R3.6.5.
Yes 3.6 ordinarias que en él deben tener lugar. '- Entrevista con el personal para comprobar conocimiento sobre los tableros de la sala de 1 N/A N/A N/A
(Check) R3.6.4 - Los miembros del equipo de primera equipo.
línea entienden cómo usar la Sala de equipo. 1 - R3.6.1, R3.6.2 y R3.6.3
DPO.MGT.2.0.Sala del equipo de entrega.xlsx - Acompañamiento en campo para verificar interaccion con la sala de equipo al momento de
cumplieron.
DPO.MGT.2.0.Sala del equipo de gestión.xlsx liderar las rutinas. N/A N/A
DPO.MGT.2.0.AlmacénSala de equipo.xlsx
0 - Sin R3.6.1.
Team Room Efectividad ENG v1.xlsx '- Entrevista con el personal para comprobar conocimiento sobre sus Pi critico que impacta
su tarea diaria
R3.6.5 - Los miembros del equipo de primera Sala de equipo Warehouse.mp4 - Acompañamiento en campo para verificar interaccion con la sala de equipo al momento de
línea entienden cómo impactan a los PI con Entrega de la sala del equipo.mp4. liderar las rutinas.
sus tareas diarias.
- Entrevistas al equipo operativo para validar la conexión entre PI critico vs tarea
- Impacto y desarrollo de indicadores N/A N/A

El tratamiento de anomalías se realiza cuando


un KPI/PI no logra los resultados esperados en
el ciclo SDCA.
R3.6.6 - Los problemas se resuelven gracias a El tratamiento de anomalías es una actividad
las rutinas realizadas en la Sala del Equipo. que:

• se enfoca en reducir las anormalidades que N/A N/A


afectan fuertemente los resultados importantes
asegurando que se tomen contramedidas,
eliminando sus causas fundamentales
R3.7.1 - Disparador definido para las 1. Verifique que esté claro para todos los
• inicia reacciones inmediatas cuando ocurren
herramientas de resolución de problemas miembros del equipo cuándo activar cada
anomalías N/A N/A
utilizadas en el área. actividad de resolución de problemas.
• desencadena la actualización o creación de
2. Asistir por lo menos a una reunión para
los estándares requeridos
verificar si las desviaciones están siendo
R3.7.2 - Las acciones del tratamiento de • reúne todos los esfuerzos de las personas - Bitacora (listado) y definición de disparadores para los indicadores que se revisan en las
debidamente tratadas;
anomalías incluyen los esfuerzos de cierre del 3. Verificar si se están identificando las involucradas en el proceso para tratar y rutinas mandatorias.
ciclo SDCA para cerrar las brechas de manera causas raíz, si los empleados están solucionar las anomalías - Disparadores calculados según tendencia (disparadores retadores que ayuden a activar N/A N/A
sostenible. 5 - Todos los requisitos • Desarrolla la capacidad de la organización herramientas de gestion)
utilizando correctamente las herramientas
cumplidos. para resolver problemas.
R3.7.3 - Los problemas recurrentes o crónicos necesarias para la resolución de problemas -Validar la aplicación del reporte de anomalias, se activó posterior al uso de las
y si se están elaborando acciones.
se escalan a otros métodos de resolución de 3 - Además, R3.7.3 y R3.7.4 Los factores desencadenantes deben definirse herramientas del SDCA (action log, opl´s, sop´s, entrenamientos, 5ws, etc)
Tratamiento de problemas (espina de pescado, mapa de 4. Verificar si el liderazgo alienta y reconoce
3.7 cumplieron. para escalar a Tratamiento de anomalías 1 N/A N/A N/A
Anomalías(Act) el uso de herramientas de resolución de N/A N/A
procesos, mapa físico, lluvia de ideas, mapa cuando la herramienta 5-Por qué no soluciona -Validar si los problemas graves fueron tratados con ( ishikawa, paretos , mapa de procesos
de problemas, 5-Por qué, etc.) problemas por parte de la primera línea.
1 - R3.7.1 y R3.7.2 cumplen. el problema con éxito. Algunos ejemplos etc.)
pueden ser: presionar un disparador de 5-Por
0 - Sin R3.7.1. qué por tercera vez en un turno o día, un gran - Equipo de primera linea debe ejecutar herramientas de solución de problemas)
R3.7.4 - Los miembros y líderes del equipo de evento de pérdida, cualquier incidente de
primera línea ejecutan la resolución de seguridad o calidad, etc. Sin embargo, cada - La aplicación de herramientas de la solucion de problemas deben tener impacto
problemas de forma autónoma, no solo por N/A N/A
tema debe desarrollar su lista de disparadores POSITIVO en el desarrollo de KPIS Y/O PIS
parte de los líderes. en función de sus procesos y rendimiento
R3.7.5: métodos de resolución de problemas únicos. capacidades.
relacionados con mejoras en los resultados de N/A N/A
PI y/o KPI. Si el tratamiento de anomalías no tiene éxito y
el problema se vuelve crónico, el equipo debe
escalar el problema. Con base en las
prioridades del área y los recursos disponibles,
el gerente del área puede decidir formar un
equipo para profundizar en el problema
utilizando el método PDCA (ver Tema 4.6)

DPO.MGT.3.7 Informe de anomalías.xlsm


Questionnaire - Management Pillar 73%
2nd. Calculate the score accoring to the "Scoring" and insert it in this column (or in column N). 1st. Insert in this column (or in colum
Reporting Period: Mandatory: 1 73% 64% O) YES or NO, according to each
requirement.
Facility Name: 64%

Question
Mandator ID Question/Topic Requirement How to Check Scoring Guidance Global Owner Feedback Playsheet MAZ WH - DDC WH - DDC DEL - DDC DEL - DDC DDC
Weight
y
MANAGE TO IMPROVE N/A N/A N/A
4.0 MANAGEMENT BY OBJECTIVES (MBO) N/A N/A N/A
R4.1.1 - Planes de cumplimiento de objetivos 1. Verifique los planes de logro de objetivos
elaborados (por ejemplo, plan estratégico, del departamento.
cascadas de KPI 1YP, etc.). 2. Entrevistar a los empleados para medir N/A N/A
su conocimiento de la conexión entre sus
R4.1.2 - Seguimiento y monitoreo mensual de objetivos y las acciones definidas para
objetivos individuales que se realizan en una lograrlos, así como entre sus objetivos y la Nota: si un área no tiene - Validar con el ciclo de gestion que se hayan definido estrategias, priorizaciones y
reunión de rutina mensual existente. estrategia de DC/DC Dream. miembros de ABI, califique proyectos que se ejecuten en el año
3. Entrevistar a los empleados para verificar esta pregunta como N/A para El establecimiento de objetivos y la cascada en
función de los impulsores de la empresa y las N/A N/A
el seguimiento y monitoreo de sus objetivos. esa área - Definición de las metas individuales hasta N4 (SOLO PERSONAL ABI) , estas metas
4. Consultar la bitácora/plan de acción del iniciativas estratégicas es el primer paso para
deben estar alineadas a la BU, zona, CD
área o departamento. alinear a todos en la misma dirección para
5 - Todos los requisitos - cascadeo de metas
mejorar los resultados. En otras palabras, el
Monitoreo de R4.1.3 - Los planes de acción para los KPI de cumplidos. - rutina de seguimiento en cascada ( definición de metas hasta N4)
4.1 establecimiento de objetivos y la cascada es el 1 N/A N/A N/A
objetivos (Do) bajo rendimiento se revisan adecuadamente. despliegue y el desglose del plan estratégico
3 - Además, R4.1.4 cumplió. -Planes de acción efectivos para desviación de las metas individuales N/A N/A
en objetivos específicos a través de todos los
niveles. de la organización.
1 - R4.1.1, R4.1.2 y R4.1.3 - Validar que la estrategia del CD haya bajado a todo nivel y validar en entrevista que la
R4.1.4 - Empleados conscientes de la cumplieron. gente conozca la conexión con el SUEÑO
conexión entre sus objetivos y la estrategia DPO.MGT.4.1 Monitoreo de objetivos.docx
DC/DC Dream. 0 - Sin R4.1.1. -Mejora de las metas individuales en consecuencia de los planes de acción N/A N/A

R4.1.5 - Ejemplos de cumplimiento de


objetivos debido a la ejecución del plan. N/A N/A

R4.2.1 - El área cuenta con una sólida rutina 1. Verifique todos los proyectos Nota: si un área no tiene
de seguimiento para monitorear el progreso de implementados en el área, los proyectos ningún proyecto/iniciativa para N/A N/A
todos sus proyectos. incluyen: CAPEX o no relacionados con el año en curso, y ninguno se
CAPEX, resultado de una actividad de transfiere del año anterior,
R4.2.2 - Existe una clara vinculación del resolución de problemas o no, en cascada califique esta pregunta como - Activación de rutina MENSUAL de seguimiento sobre los proyectos que se identificaron en
DAFO, objetivos estratégicos y 1YP del área desde la Zona/BU, etc. Los proyectos priorizados por la unidad están
N/A para esa área el ciclo de gestión N/A N/A
con sus proyectos. conectados con el sueño y fueron definidos
2. Verificar quiénes son los participantes del
equipo de proyecto, sus roles y las rutinas utilizando la herramienta FODA (1.3 Definición
5 - Todos los requisitos - Asegurar que las estrategias y proyectos hayan surgido del analisis FODA, de los 3
Gestión de R4.2.3 - Los miembros del equipo de todos de seguimiento de proyectos del área. de Objetivos Estratégicos). Las acciones que
4.2 cumplidos. negocios 1 N/A N/A N/A
Proyectos (Do) los niveles del departamento participan en los apoyarán el progreso del proyecto deben ser
3. Revisar los materiales de la reunión
proyectos que se ejecutan en el departamento. (TORs, documentos, etc.) para verificar si el monitoreadas siguiendo los lineamientos de los N/A N/A
3 - Además, se cumplió - Participación del 100% del equipo del CD en la ejecución de los proyectos
TOR (3.4 Control de Gestión y Sistema de
seguimiento de los proyectos se está R4.2.3.
realizando correctamente. Reporte).
- Evidenciar mejoras en los KPI´S que estuvieron comprometidos dentro del proyecto.
R4.2.4 - Ejemplos de mejoras en los 4. Verificar si los proyectos están 1 - R4.2.1 y R4.2.2
resultados comerciales debido a una iniciativa correctamente conectados con el Sueño cumplieron.
estratégica y cómo los productos/resultados de DC, sus objetivos estratégicos definidos o N/A N/A
los proyectos se estandarizan nuevamente en alguna iniciativa de Zona/BU. 0 - Sin R4.2.1.
las rutinas para garantizar su sostenibilidad. Nota: para un área pequeña o
R4.3.1 - Los problemas seleccionados para 1. Verifique el proceso que utiliza el área de una sola persona, es
abordar utilizando PDCA están conectados a para iniciar un nuevo PDCA. ¿Cuáles son N/A N/A
aceptable la puntuación
los objetivos estratégicos definidos. los factores decisivos? ¿Quién está La resolución de problemas es una parte
R4.3.2 - Lista de verificación SDCA utilizada basada en su participación en
involucrado y por qué? fundamental del sistema de gestión de AB
antes del inicio del PDCA para evitar los esfuerzos de PDCA
2. Hable sobre al menos uno de los InBev. AB InBev define el PDCA (Plan, Do, - Definicion de PDCA estrátegico conectado con almenos 1 de los proyectos N/A N/A
reinventar la rueda. internos o externos a su área.
miembros del equipo PDCA de PDCA del Check, and Act) como una metodología
Si un área no tiene ningún
área. Comprender sus rutinas y procesos estándar para alcanzar objetivos y resolver - Validacion de lista de SDCA y herramientas previas antes de la jecución del PDCA
R4.3.3 - Fase de observación completada PDCA para el año en curso,
de pensamiento a medida que avanzaban a problemas. Se utiliza para abordar los desafíos
dividiendo el problema en problemas más califique esta pregunta como N/A N/A
través de los pasos. anuales. para mejorar los resultados de - Validar dentro del PDCA que el problema se haya desmenuzado en problemas mas
pequeños. N/A para eso". área.
3. Verifique que el equipo esté de acuerdo Negocios que pueden provenir de Target pequeños
4.3 PDCA (Act) R4.3.4 - Causas raíz claramente conectadas con el enunciado del problema. 1 N/A N/A N/A
Setting y Cascading.También se utiliza para
con el problema que se pretende resolver. 5 - Todos los requisitos N/A N/A
4. Verifique que la meta sea realista y resolver problemas crónicos que provienen de - Validación del uso de herramientas para la identificación de cauza raíz
cumplidos.
discuta cómo se medirá el éxito. la rutina diaria.
R4.3.5 - Planes de acción elaborados para 5. Verifique que el equipo esté usando Si el equipo de PDCA no logra cerrar la brecha, - Validad calidad de planes de accion dentro de la etapa A
3 - Además, se cumplieron
atender los síntomas y, en especial, bloquear datos y evite hacer suposiciones o sacar el problema puede convertirse en una debilidad N/A N/A
R4.3.4 y R4.3.5.
las causas raíces. conclusiones precipitadas sobre el en el análisis DAFO del área como entrada en - Impacto positivo en el resultado despues de la ejecución del PDCA
R4.3.6 - Conexión entre el uso de PDCA problema. el proceso de planificación estratégica
1 - R4.3.1, R4.3.2 y R4.3.3
Toolkit y mejoras en los resultados de PI y/o 6. Verifique que el progreso del PDCA en (consulte el Tema 1.3)".
cumplieron. N/A N/A
KPI. curso se revise al menos una vez al mes.
Se puede incorporar en una reunión 0 - Sin R4.3.1 y R4.3.2.
R4.4.1 - Programa definido para incentivar la 1. mensual
Verificar
o celebrar
la existencia
una reunión
de un programa
de revisión
de
generación de ideas de los empleados para de PDCA por
generación deseparado.
buenas prácticas y verificar
N/A N/A
mejorar los requisitos de almacén, entrega o si existe un proceso de identificación de
flota tales como seguridad, calidad, buenas prácticas.
productividad o capacidad.
R4.4.2 - Programa de generación de buenas 2. Verificar la comunicación del programa,
prácticas debidamente comunicado. ya sea a través de correos electrónicos,
N/A N/A
tableros visuales o reuniones;
3. Entreviste a los empleados en todos los
R4.4.3 - Se está realizando un niveles para verificar su conocimiento del
reconocimiento/retroalimentación a los programa y para comprender si están Buenas Prácticas es un programa local que
empleados, así como un seguimiento de la utilizando la Plataforma de Buenas N/A N/A
tiene como objetivo nutrir, apoyar y fomentar la
implementación de las mejores prácticas Prácticas para presentar y adoptar buenas 5 - Todos los requisitos
“cultura innovadora” en todos los niveles de
adoptadas. prácticas. cumplidos. -Programa de buenas practicas, en el CD
nuestra organización. El propósito es contar
4. Verifique si los empleados están con un proceso de envío, revisión,
R4.4.4 - Se están analizando otras buenas recibiendo retroalimentación después de 3 - Además, se cumplieron -Comunicación de flujo y/o proceso de buenas practicas a todo nivel
prácticas aprobadas en el portal para implementación y comunicación de Buenas
Buenas Prácticas presentar buenas prácticas y si están R4.4.4 y R4.4.5.
4.4 replicar/implementar en el CD. Prácticas para lograr el desarrollo de la 1 N/A N/A N/A
(Act) siendo debidamente reconocidos. Verificar -Llistado y estatus de buenas practicas N/A N/A
creatividad e iniciativa de los empleados, elevar
si existe un seguimiento de la 1 - R4.4.1, R4.4.2 y R4.4.3 - Activación de reconocimientos a las mejores prácticas
la moral de los empleados, reconocer a los
implementación de las mejores prácticas cumplieron. - Feedback sobre buenas practicas que no prosperaron
empleados por su contribución a la generación
adoptadas. - Seguimiento a la implementación de buenas practicas.
R4.4.5 - Los empleados de todos los niveles de negocios y optimizar los procesos de trabajo
5. Acceder a la Plataforma de Buenas 0 - Sin R4.4.1"
conocen el programa de generación de buenas y la eficiencia. Está diseñado para ser algo
Prácticas para comprobar que está siendo simple y de fácil implementación.
prácticas y utilizan efectivamente la Plataforma
utilizada.
de Buenas Prácticas para presentar nuevas N/A N/A
ideas.

R4.4.6 - Hay una mejora medible en un KPI


o PI relacionado con la seguridad, la calidad, la
productividad o la capacidad relacionada con N/A N/A
la buena idea y la implementación de la idea
R4.5.1 - GOP utilizados como herramienta de 1. Verifique si los GOP se están utilizando
resolución de problemas provocados por como una herramienta de resolución de
desviaciones. problemas que se activa al seguir la guía. N/A N/A
2. Acceda al portal DPO y verifique si los
GOP y los kits de herramientas están
actualizados. Las Buenas Prácticas Operativas (GOP) se
R4.5.2 - Los GOP y los kits de herramientas se 3. Verificar si se están elaborando acciones 5 - Todos los requisitos refieren a las condiciones técnicas básicas que
actualizan en el Portal DPO siempre que sea para el tratamiento de las preguntas sin cumplidos. deben existir para lograr y mantener los
necesario o al menos cada trimestre. respuesta. resultados de CD objetivo. Es una colección de N/A N/A
3 - Además, se cumplió buenas prácticas ya probadas que se recopilan
4.5 GOPs (Act) R4.5.3. a nivel mundial y de zona para implementarse 1 N/A N/A N/A
en todos. Los GOP proporcionan una lista de
R4.5.3 - Se han implementado acciones para 1 - R4.5.1 y R4.5.2 cumplen. verificación de acciones prioritarias que ayudan
todas las respuestas No y notas para todas las a los sitios a lograr sus resultados.
respuestas N/A. 0 - Sin R4.5.1. N/A N/A
DPO.MGT.4.5 GOP.pptx
R4.5.4 - Conexión entre acciones completas y
evolución de la adherencia del GOP.
N/A N/A
Questionnaire - People Pillar 73%
Reporting Period: Targets : 73% 64% Mandatory: 0
Facility Name: 64%

Question
Mandatory ID Question/Topic Requirement How to Check Scoring Guidance DC Comments & doubts Global Owner Feedback WH - DDC WH - ABI #REF! DEL - DDC DEL - ABI #REF! DDC
Weight
PEOPLE PILLAR N/A N/A N/A N/A N/A N/A N/A
FUNDAMENTALS N/A N/A N/A N/A N/A N/A N/A
1.0 RECRUITMENT & SELECTION N/A N/A N/A N/A N/A N/A N/A
1.1 How effective are the Supply Chain R1.1.1. Every person participating in the interview process went 1. Score zero: You see that Recruitment & 5 - All requirements are met It is vital to have the right talent, in the right position at the 1 N/A N/A N/A N/A N/A N/A N/A
2.0 Teams
REWARDSin attracting diverse talent?
& RECOGNITION through the interview Bias Breaking training. Selection process is not standardized or 3 - In addition R1.1.3, R1.1.4, R1.1.5 and right time. To achieve that, we have to have an accurate
N/A N/A N/A N/A N/A N/A N/A
R1.1.2. Each role being recruited has a Job Description aligned guidelines not followed. R1.1.6 are met demand plan, updated job descriptions, a bias-free and
2.1 How effective is the Rewards & R2.1.1.
to the Roles Thereand is aResponsibilities.
Recognition Program in place, but the criteria 1. 2. Score
Spot check zero: aYou couple see job thatdescriptions
there is no (both 5
1 -- All requirements
R1.1.1. are are
and R1.1.2. metmet The Rewards recruitment
standardized and Recognition process system and aand focus criteria must be
on diverset 1 N/A N/A N/A N/A N/A N/A N/A
3.0 Recognition
LEARNING & Strategy
DEVELOPMENT to succeed
R1.1.3. TheisPeople unclear team and has / or Demandnot communicated Plan as part to the of their recognition
leader and team framework member in place.positions) There and is no 3
0 -- In addition
R1.1.1. R2.1.4.3,
or R1.1.2. R2.1.5.,
is not met R2.1.6., R2.1.7 clear
talent.toAll alldataemployees,
must be because kept up to it is
datea fundamental,
in Workday. N/A N/A N/A N/A N/A N/A N/A
department.
MCRS to review each status of Selection process. awareness
understand of from Compensation
the department Packages how they and/or are and R2.1.8. are met influencing engagement, productivity, good team work and
3.1 Is the Learning Strategy connected to the R3.1.1.
R1.1.4. Some
R2.1.2. Team
The Demand leadersPlan
members actively
clearly support
assumptions understand learning
are their reviewed through
Compensation and their 1.
the Score
used, conceptwho zero: of You
updates see
3R Methodology.themthat: and at what (Moves to how 5 1 -- All requirements
R2.1.1. are and
and R2.1.2. met R2.1.3. are met Active
autonomy. Learning Fairness mustand be supported
Transparency by leadership
are critical through for the 1 N/A N/A N/A N/A N/A N/A N/A
3.2 Business
Is Strategy
the Induction and activates
process completedan for actions
& Benefits
updated
R3.2.1. and
New aTeam
onpackages routine
Hires MCRS
can including
describevariable
basis. ABI Dream, compensation Principles,and and Learning
to coach)zero:
frequency.
1. Score is an You isolated see process that: Induction not connected Plan or 5 3
0 --- All
In addition
R2.1.1. R3.1.4,
or R2.1.2.
requirements are R3.1.5.,
or R2.1.3.R3.1.6,
met and
is not met communication
Recognition
The Inductionprogram and active
Process toisbe theprogress
motivational, review
First Impression that(MCRS,
isourwhy NewPeople
the N/A N/A N/A N/A N/A N/A
1 N/A
ActiveNew
both Learning Culture? R3.1.2.
targets.
R1.1.5. by Learning
Historical isdatascheduled isinDriver's
tracked forto Learners
identify shifts in workforce to
2. the inbusiness
Understand
3. Score
Talk with theYou thestrategy;
plant various manager Learning
recognition is
andstandardized orviewed
dept is not as 5 R3.1.7. are met Committee
programs or need etcl)in and
to belearning get.prioritization
feedback-based, too.&toeffective
happen
3.3 How well isJoiners and
the Skill Job Movers
Acquisition so
Process Culture
R3.3.1.
R3.1.3. SKAP
Some
participating
is simple.
leaders support
a formal induction
License/Basic program
Skills are New
1. Position
zero: Plan see does thatnot SKAP exist 3 - In addition
1 -- All
R3.2.4.,
requirements areR3.2.5.,
metmet R3.2.6., R3.2.7. The Joiners
The Skills
New
Acquisition Position
Process A positive
(SKAP) is the fundamental to 1 N/A N/A N/A N/A N/A N/A N/A
they areutilized
(SKAP) integrated
to into ABI
upskill ourculture
Teamsandto
R2.1.3.
trends (New
R3.2.2.
defined
The department
New
and Hire
Hires
all team TO, Exit
& members
Job Rootlearning
follows
Movers the
Cause,
can
Target
participate
explain
initiatives
etc.). Setting thebyManagement
in purpose
it's
& partnering
Cascading another
mechanisms
managers
executed
tools are
activity
upon
not
available
to utilized
understandto complete
or processes how rather
theyare than
participate
not
a key in and
3
R3.1.2.
R3.2.8. and R3.1.3.
areR3.3.4, are
met R3.3.5. consistently
3R concept
experience isand
vitalhave
as for the relevancy
a driver
their of continuous
success init the
deserves.improvement
first weeks. The and
3.4 Is Learning
quickly andresults.
deliver Development with
process
R3.4.1.
R1.1.6.
System SiteSites Learning
within
Time
to improve the
share fill teams
tomembers Zone
critical
positions
results toand
People identify
data
must Cycle.
to
their beZoneknowledge3R
tracked
role People & and
in methodology
Autonomy skill
for Zone-wide
stay under gap 45 enabler
3.
1. Talk
theScore
2. recruitment
Interview for
with zero: Autonomy
the You
a population department
process, see that
including
of new manager
therehires istheirNo on
and how
clear ask 5 0 ---- In
1 All addition,
R3.1.2. or R3.1.3.
requirements
R3.2.1. and are
R3.2.2.is and
not
metmet and R3.3.6. are developing
R3.2.3.are met Learning
autonomy
To develop
content mustmust skills
must bebe
relevantbeand
made continuously
clear
content,
relevant, simple
towell alla-timed
and
bottom improve
& effective
buildup too
(not on inoperational
terms
the
approach
fast/late), of
Rewards
must the
upbe &
to 1 N/A N/A N/A N/A N/A N/A N/A
drive Autonomy and Results? R3.3.2.
R3.1.4. Team
Learning isall part can summarize the SKAP development followed met resuts. The process is made of four steps: 1. Map out the
3.5 Methodology
Are utilized
there Learning structure concept
to ensure learning R3.5.1
Learning
days. Where
R3.2.3.
feedback
isNeeds
Buddy
Site clear
loop haslegallyato
Analysis
process training
framework,
teamisofin
permitted, the
members
budget
SKAPplace General
thetools,
and sitecalendarManager
tracks
and required
MCRSdata
Diversity
(site training
skills
where process
for
Learning
Target
awareness
them
1.
2. Score toSetting
Interview
forInitiatives
recite
zero: learning
andemployees
and
ABI
You
are
any
understanding
Dream,
see
developed
applicable
developmentthat
and Principles,
Learning
ask ofthem and
Zone
or
the execution
Employer
and
structure
to
3
0 ---- All
5
1
In additional
R3.2.1.
R3.3.1
R3.4.5.,
or R3.2.2.
requirements
and are
R3.3.2.
R3.4.6. is
orand
R3.2.3.
met R3.3.3.
and
notR3.4.7.
aremet
met
learning
followed
date
Training andcontent,
Recognition
Expectation,
-updated
from
must 2.
learning
communication.
teams,
remain as per
Assess aover
the
access
feedback
priority sites,
currenteven
and learninglevel
BU/regional
received.
when
skill gap, budget
3.
format
Close
all (video
the
challenges
the skill 1 N/A N/A N/A N/A N/A N/A N/A
plans,
R2.1.4. results,
The criteria and leadership
of the (i.e.Recognition support for
program training are is shared
clear & with deployed
rewards as
programs standalone (e.g. training events only vs OPL vs SOP etc.).
experiences measurably
fundamentals in place? improve R3.4.2.
from
R3.2.4.
plan)
their role
Sites
application
Assigned evaluate
toBuddies
hire learning areGender, through
selected learner NPS
background,
selected for scores
education,
the Buddy 2. Ask Proposition
Value
Culture.
fundamentals
describe
forCan proof
the Driver's they
are of not sharing
(EVP).
describe in Moja
License place critical
Understand Afrika,
concepts
for emails,
siteAPAC
their
data
whenback
with
role.
3Rs, are
Do 3 0
met
- In addition R3.5.3.,orR3.5.4., R3.5.6., way to the zoneto&a
Theintroduced
R3.5.7., are fundamental ofglobal. or Only
zone.when
alldevelopment
site induction processes
The the challenges
training must
budget be and
the
for a
MANAGE TO SUSTAIN outcomes? the
etc.)entire
communicated.
R3.4.3.
process
R3.5.2. Site
haveSite
Certified does at least
good not
Trainers
quarterly
have
performance areclear process
and
identified forleveraged
interpersonal
and learning skills for with
(check-the-box)
NAZ
to
theySMS
accuracy
formal Learning
2. Ask Quarterly
went for(through
andthrough
the Bonus/Gain
give
training meeting
the
examples lastnotes, Bias
plan/calendar. Share)
of Breaking
actions align How to
file
they the
many 1 -- R3.3.1
or R3.5.8 R3.4.1. or R3.3.2.
and and R3.4.2.
R3.5.9. are met
R3.3.3.
and is not
R3.4.3. met
are met gap
needs
Dream,
given
through
ofour
year the training,
frontline
Principles
must be used are
and inclear,
thefull.ABI
and
can(local)the on the
relevant
culture.
jobcontent
application be N/A N/A N/A N/A N/A N/A N/A
R3.3.3.
R3.1.5.
R2.1.5.
development, SKAP
Leaders
Recognition tools support
execution, (SKAP
happens Guide,
learning
or on demand Driver's
initiatives
routinely Licenses,
by
- formallypartnering and/or they understand
department Initiatives
strategy. the are basic not skills
connected required to for the and 4. Re-assessment & feedback to close out skill gaps and
4.0 WORK ENVIRONMENT & ENGAGEMENT R1.1.7. There
R3.2.5.
training The
events. effectiveness
is a Buddy ofevaluation
the
""match"" assessment plan is oneevaluated weekand sharing,
training
after role?
the
of individual
the plannedetc.).
and how Does
can they
initiativestake this todata
apply live
have it"assist
been the
them. executed? SMS 0 -- R3.5.1
1 R3.4.1.andor R3.4.2.
R3.5.2.orareR3.4.3.
met is not met developed
The Buddy
Equally (learning
importantsystem isneed
aCertified analysis)
powerful tooland effectiveness
to -support
not onlyour new of in of N/A N/A N/A N/A N/A N/A N/A
Assessment
Site Learning Tools,
teams etc.)
to and
identify processes
knowledge areand standardized
skill gaps Ask them why aanalysis
DL exists? prioritize new skill are
gaps to be addressed. trainers because
informally.
R3.4.4.
routinely
buddies
R3.5.3.The Sites
and
have The
site beeneffectiveness
contribute
actions
utilizes are
assigned atto taken,
least of
Zone-wide
and the
in based
90% recognition
ofneeds
partnership on feedback
training program
analysis
with Zone to
from is both business
identify
People 4.
4. Talk
people
3. the with
Discuss
Interview to orteam
the peoplePI/KPIs
aa needs members
site's
population demand in
heofpackage,
the
new that
plan department
hiresis
with beingand the ask Plant learning
position be
not measured
likeonly onthethe
(Kirkpatrick
allfunctional
Model).
level, but also to
4.1 evaluated
Is the work environment Safe & Inclusive? skills
R4.1.1.
R3.1.6.
measured. The
or Learners for
knowledge use
department across
have gaps isaccess
the
has
that site
formalto
require learningand formal informal
that isbudget
training. feedback
in alignment Are
3.
1. Critical
Score
Learners
about their
needs Team
zero:
do not
compensation
of
Check business
members
have ifaccess appropriately
should
departmenttowhat be
learning asked
(fixed, shows to 5 0 -- All
R3.5.1 or R3.5.2.are
requirements is not
metmet their
SKAP
Similarly functional
Guides knowledge,
outline
with skills
physical butby also
work because
position
environemtn, and ofshould
their
the cultural
identify 1 N/A N/A N/A N/A N/A N/A N/A
Function,
parties,
R3.5.4.
R3.3.4. a
The to
new
Critical improve
buddy
Training
in Role
the
plan
Team talent
assigned
ismembers
reviewedacquisition
if needed during process.
the L&D MCRS for conducted?
Mgr and
them
reflected how People
inthey the participate Mgr, loop
schedule? including in the Management visibility To understand
understnad
fit, didactic if the
all routines,
skills, their developed
-good
capability learning
practices,
to explain experiences
the team
content dynamicdrive
inbecause
context
4.2 mechanisms
with
R2.1.6.
R3.4.5.
How effective is the Zone Communication R4.2.1.
R1.1.8.
R3.2.6.
the
strategy
site and Departments
Leaders
The
AllinNew site
is
place.
department act as
has
Hires/Job
updated anhave to has
action routines
functional
Movers
reflecta planrobust can
business incan
experts
in place
place
explain
explain
on
communicationneedtoknowledge,
to discuss
improve
their
theirplan
role,
current
team
the skills,
built 1.explain
significant
resources
variable/bonus,
3.
theyGather
Score
System.
3. haveWhat
Review
the all
zero: feedback
gaps
theNPS
into You
the
in surveys.
and
actions
formal
utilizing
see
Zone'sbenefits
do
program that for
feedback
For
demand
they as
thereSKAP:
take
for applicable),
all isplan,
tono
Certified
Can they
tools.
scheduled support asPeer
You as 5
well
3 -- All
In addition, R4.1.5.,
requirements areR4.1.6.,
met R4.1.7., not
value,justconstant
psychological
Communication
etc. -their
that
individual
is and
work gaps
whyfeedback
helps
it istofullus but
environment build
ofcontinuously
utter
highlight
andimportance matters
measurement
relationships, structural
signficantly
theof
that
issues
effectiveness
exchange
only selected
across
ideas, 1 N/A N/A N/A N/A N/A N/A N/A
plan? progress
R4.1.2.
R3.1.7.
member
and
into behaviors
its Team
Leaders
MCRStarget acquisition
members
to actively
achievement.
necessary
ensure of canrequired
seek
to
leaders speak
to learning
reskill
are skills
clearly
the
providing and to current
opportunities
team what(future
their proficiency
isteams
expected
forneeds)theirwith verbalize
see
2.
well that
Review
as
communication the
members
the
understanding
training/learning following
MCRS events
strategy cannot for components?
of speak
various
their
was
or plan an targets.
NPS
into
leaders.how
place. 1)
provided theyIs R4.1.8.,
3 - In R4.1.9.
addition and R4.1.10.
R4.2.3. and are are
R4.2.4 met met itand
a given
is
must the
develop be sitecapability
atmosphere
conducted
ourselves the -in
andon zone.
which
site
others, andEveryone
oursharezone
adaptoperate.
teams needs
level.
knowledge,
content
toHere
express
tothe
complete the
our
diversity
responsibilities,
R3.5.5. (as department
Training defined and
aids by
required
and Zone)materials of candidates.
critical &are skills made for effective
available job
toto as Score
the understanding
flow of
Trainers. How work? are what
Cantrainers theyroutine conclude
identified, isrole inare place
which
selected, to individuals,
audience who are culture of aambassadors, possess the right
4.3 How well is the department empowering team R4.3.1.
(at
from a minimum
them The
members at3R DLs)
work. in alignment has open
with business confidential strategy ways and 1.
Expectation
contribute
learning zero:to
present? ofthe You
required see
Site/Company
Do that
skills
learning Thereofinitiatives
Dream. 2) gaps
Bythein 1 5
1 --- R4.2.1.
All requirements
R4.1.1. are and
and R4.2.2.
R4.1.2. met R4.1.3. and The
the
focus physical
Drivers
inandonand their
work
License
topics need.
environment
likepartpsychological SKAP surrounding
guide
safety, beforeour teams
starting
collaboration, in 1 N/A N/A N/A N/A N/A N/A N/A
R2.1.7.
R3.4.6.
multiple
R1.1.9.
its teams to ensure they have the proper performance
learners
The
Training
channels
Local
during
Methodology
demand effectiveness
for receiving
learning planning
experiences
isis implemented
isevaluated
information
predictive about
and& leads
utilizing the
atopics to
strategy 5.
to
2. Talk
the
Review
is in actions
utilize
and
to
demand
support
certified?
team
participants? the members
IsMCRS
planning
autonomous
this process totostay
&communication understand
or inahead
which
standardized ofifappear
actions for3) 3 and are met needs
and R4.3.5. are functional
To
the be able verify
knowledge
to execute our understanding.
and
theirgreat
the training didactic Listening
skills and
can speaking
be buddies.
4.4 escalate
R3.3.5.
R4.1.3.
communicate
improved
Kirkpatrick
important
work-environment
Skills
Recognition
results
toModel assessments
progress
them. in the
Levels happens through issues
must
department.
1-3 (inrandomlybe
regular
Handbook); conducted
Team or is
1:1s notby
members
There individuals
standardized
is can
evidence
the
speak strategy.
link
4.
physical
Alignment
speaking
onInterview
the
between action toofteam
Speak
work
L&Dskill
logs?
their to
environment
proficiency
members,
target
Site the Teamteam achievement,
how with
you
members seethe
the that
learning leader
ifrewards
they there
is 0
- In addition
R4.1.4.
- areor
R4.2.1. metR4.3.2., R4.3.4.
R4.2.2. is not met
speaks
are the
toservant
operations.
support, most
them during
Advanced
leadership
important tools skills
and
we allplans,
full shift
are
have
and
mapped
practices
and
not to
hence
as
only
and
the
trainers
it is important
autonomy.
behaviors
saying
and
goes 1 N/A N/A N/A N/A N/A N/A N/A
conditions to do their jobs? place
R3.2.7.
R3.5.6.
R4.3.2.
that haveto select
Induction
The talent
department
mastery Program proactively.
ofcommunication
the has feedback
routinely
skillour structured reviews from and New
feedback Hire/Job
standardized regarding Movers vacancies.
they
the need
site?
department
A tools
development to
In orUnderstand
build
reviewingthere
plan confidence
is
toand the
no the
address MCRS
training
mechanism in taking?
any logic.
calendar,
gaps to voice that are met Asking
physical
that
SKAP it is for
is safe,
only ongoing
conditions inclusive,
successfulfeedback
needenabling
iftomouth,
beabout
is ainroutine
itfoster the
place,
to perform full
but process,
andalso ones
owned including
processes
work,
by giving to
R4.1.4.
R3.1.8.
to
of operational
improved
R4.2.2. Awareness
Leaders
The capability
"WHY" across
results and/or
from
(Purpose) the Site
behaviors
istrainings
an about
continuously
integral driven the partmeaning
prioritize
by of3R the Ways of of a understand
driving is
3.
& no
Ask
developed, awareness
to view
available deployed,
why the about
is
the site
clear.
given Psychological
Training evaluated.
topics Plan,are Safety
calendar.
Is there a 0 - R4.1.1. or R4.1.2. or R4.1.3. or R4.1.5. is that
- we need
have to
2 be
ears inandplace one to continuous
let us use improvement
it proportionately.
5.0 TALENT & GROWTH R1.1.10
is formally
processes
proper
R3.3.5. Local gathered
in place
conditions;
Critical talent
Role partnerships
(before,
to team
leaders effectively during,
actively
members are
execute and
listen in
and place
after
L&D
and
theirhave with
induction)
activities
solicit
leader universities,
input meet (e.g.
on 5.
4. Check
In
Certified
such
currently discussions
gaps D&I
Trainers
exist analysis
to managers.inprocess with new
the facilitators
proficiency & priorities
hire 4) and A (where
their
ofarevisit
these peerlegally 1 - R4.3.1. is met the buddy
measure
space program
for training
rest and is
ofisprogress very
recharge important.
(e.g.
andlearning
and positively plans) and
reinforcing & gather
our N/A N/A N/A N/A N/A N/A N/A
Psychological
'pull'
Working.
R3.4.7. learning
communication.
schools
R3.2.8. Sites
andNew
All
Safety
environment.
participate
community
Hires/Job
and inInclusive
groups Informal
the
Movers formal Behavior
tolearning, and
support
receive Design formal learning
process
a diverse
regular
taken
1:1(as
place.
to defined
feedback
and
For
6.
clear Inclusive
past
Review proactive
communicated
permissible) learning
the criteria inare events,
thethey of being
given theaispartthere
recognition
followed,
timeline. roster
What ortothat isthe
is it not met everyone
and autonomy
Communication individually most rather
individuals effective than by management
teams.
when it is setstate. the
in context,
5.1 classroom,
how
during
R4.1.5. to regular
opportunities
R1.2.8.
resolve
Team
An
OJT, 1:1 virtual/distance
issues.
members'
are
action toinformal
available
plan align with on
feedback
at
clearaall employee
levels
Rolesdrives self-study,
development
the Recognition etc.) plan to team
courses?
2.
2. When
results
When
exists
members,
ofwalking
for the ifdevelopment
walking
attendance? around
around the
the plandepartment
departmentof
to making
determine and
and if 0 - R4.3.1. is not met feedback
culture.
people team.
Leadership
W to gemba
continuouslywalks, improve
with the
theotherfocus current
to remove obstacles, 1 N/A N/A N/A N/A N/A N/A N/A
develop
R4.2.3.
by
on
R3.5.7.
R4.3.3.
fill their Formal
Zone)
identified
Program
and
candidate
induction
Formalized
Leaders execute
skill
strategy
andgive
gaps
learning
pool.
process
learning
timely
(frequency, or
two-way
Engagements
fromplans initiatives
feedback
proficiencies their
recognition exist lineon& with
for Responsibilities
communication
leader
all theseroles
critical
rewardrequests etc.)the -methods
partnerships
-status
rules
is in program
retrospective?
their
6.
4.
gapsIn
& improvements
Pull
site, feedback?
the
note
are
and
LEdemand forboth
the
closing the to
basic it is plan
their
L&D
(may
inclusive
work -include
dailycheck
training
environmentto all.
the
operations?
budget. monthly
re-assessment). Is at contains
Finally,
We cannot allthe "Why",technology
availbel
assume explains
what the whymust
withchallenges be alternatives
usedare and to support
support
what to a is&the
best
MANAGE TO IMPROVE R3.1.9.
place
R3.4.8.
are
R3.2.9.
R3.5.8.
WHY. toAll
utilized
measured Leaders
close
Sites
All New
learninggaps
to execute
cascade
to advocate
Hires/Job in easily
determine 3R
initiatives
for
andMethodology
Movers and
accessible
collect
whichhave
participate
information,
activations
can
a in
describe
channel the in
learning are
for
their
department.
solutions
align the
their team's
most
role
participants that&
team, to
site,
5.
3. Ask
evolution
5. Ask
least
note
4. Understand
7. Interview
conditions.90% for
new
the
Zone-wide
andof hiresit
Include
basic
itstarget
the
used
Leaders
accuracy
if a
work
various
by achievement
feedback
buddy
restrooms, end
environment
and
communication
including
has
of
Site
ofbeen
the
change
Learning
status
site
year? a strategy
assigned. If
rooms, andnot,
build
solution
learnesrs
for our
trust were
teams-
& relationships
considered
Workday,
- we have Acadia,
to but ask
team
not
DeepHow,
them chosenmembers,
- and and
SKAP
do asks
so etc.
on for
-
an if the N/A N/A N/A N/A N/A N/A N/A
R3.3.6.
requirements
development
R2.1.9.
enable Critical
As
learnersper are
by Role
creating
department
to gain Team
transparent time
subject membersto
members' and all.space can
feedback, explain
for learning thehow SKAP
recognition 4. Critical
conditions.
Teams
actions to
team teamInclude
discuss members members restrooms,
strategy at should
inanalysis.
various change
relation be levels able
to intothe
rooms, the coach where needed etc. are greatly a important. Team leaders
6.0 AUTONOMOUS TEAMS actively
effective
purpose
provide
R4.3.4.
improves
listen
and
feedback
The and
how
department
personal itsolicit
impacts
performance, has an matter
input/opinions
the location
up Site toto expertise
datefrom
Dream
results,
the
strategy
and
team.
to include
to address
contribution the is
Learning break
contribution
mechanisms
to
6. improve
Inquire
there
summarize oracanteen
or the
toin
demand
about
plan formal
theaplace
invarious list
areas, plan needs
department,
of to accuracy.
existing
tools use
etc., init fit
in
they
both
for
your useaReview
assignments Did
formal
training
walk
them
and
the feedback.
existing
ongoing toolsCommunication
basis. doFeedback
not mostsuffice, ismust this
crucial be
needsto 2-way bestreet.
toteams,
understand raised Also,
to the
where thewethe
N/A N/A N/A N/A N/A N/A N/A
R4.1.6.
R3.1.10.
program
R3.4.9.
Communication
100%
R3.5.9
larger
Team
Employees
is
Sites
Mindset.
Sites
issues
members
updated.
can
utilizes
and provide
channels
the
have
The
available
team
can
program
are speak
a channel
evidence inclusive
technology
is enabled isto the ask
ofcustomized.
critical Site
toofaddress
for
gender,
and
&missing
learningZone
resourceswork
Dream.
age,initiatives
function.
to of
break
knowledge
dept
zone
informal,
routine.
from
need
about. are
actively
site
byAlso
canteen
taking
as
"the
owner. andwell
end
spot
skills
to
contribute as areas,
ofclose
check where
the
gaps etc.,
any
to
year?
ofgaps.
providing
they
conditions
the your team.
inSpeak
of
walk
insight
the Did
MCRS.to to and are meant
audience
zone.
do well and
to spend
must wherebe well we have
time
selected, with
roomespecially
their
for improvement with not in
sensitive
and to
6.1 to Autonomy
R4.1.7.
resources
R2.1.10.
resulting All teams
Rewards
in had
and the chance
Recognition to speak
Index inabout
the the that
Annual topic help
about.
team facilitate
partnership Also
members spot
happen? SKAP. check
about This
What
what includes
conditions was
3Rtraining the
means ofSKAP
result toTeam of
them. the office. 1 N/A N/A N/A N/A N/A N/A N/A
R4.2.4.
R3.2.10.
contribute
environment
R3.3.7.
R3.1.11.Critical
Psychological Sitetochanged
Communication
Cross-Zonea learner's
issuesRole
Safety
has
team
collaboration
autonomously.
Team
a Culture and
and or -individual
Strategy
experience
members
Inclusive
of Active
feedback
is taking
inLearning
Behaviora standard
execute
behavior
is collected
placeon
within
where
through
way
development
their team
individuals
did
4.
5. insight
Talk
Check
best Operator/Technician
7. Buddies
Review
guides,
with
and
Operator/Technician
partnership?
lead
demand
the theL&D
should
associated
to
site formal
plan
be leadership
MCRS vs
validated
Workstations training
actual
for
technology
Workstations
team
by intervention?
org and
they
and
&plan
chart
reviewing team
use,
Team
and topics,
understand smalleractions
Recognitionifprograms
audiences putare inwith
ofplace
more privacy
greatare of value
importance.
and andNoteffective.
only do
6.2 Engagement
resulted
regularly
practice
(Workday,
R4.3.5. inbyDeep
sharing.
Progress theSurvey
improved department
Any
How,
made is
KPIs improving.
improvements
Acadia,
towards and adjustments
LinkedIn
a more made aretoshow
Learning,
Inclusive the
communicated
etc.)
Site. 8.
6. Speak
Interview
members
accuracy
performance
review
Rooms (is
to toabout
over
it ateam
ensureLeaders
data,
line itsmembers
months. through
item
basic and
routine of site
to todecideunderstand
L&D:
discussion
discussion?)
conditions Do
are onin leaders
with
Inquire
placeif psychological
Over and above safety are
collecting preferable.
feedback, building joint action 1 N/A N/A N/A N/A N/A N/A N/A
plans
meetings
drive to
R2.1.11.
communication(through
their /
The team
own the day
learning
department
plan 70%/20%/10%
out.
arejourneys, canthan
made. speak model)
supported
to of examplesand increased
by thewhere the 3R communication the
Rooms assessment
5. Talk
theyDoes know
contribute to thein ensure
what MCRS
informing process,
their
methodsbasic
have targets conditions
site etc.
aforteam
line are,
ofvarious item
future are for
getneeds? in
enough
topics, place asup they
Not everyone is born with advanced communication skills, for
serve the purpose to recognize individuals and teams
back
R3.5.10. the
Sites team utilize 8.
team with
peers the
and leadership
leaders, and by about
interviews their to
R4.3.6.
proficiency
R4.1.8.
organization.
methodology
R4.2.5.
Regular
Leaders through
Strategies There feedback
hasindriven are
theisgreater
assessment
adevelopedmechanisms
mature
benchmark
department onto
'pull'90%
work
show
intermediate
address
learning
performance
with
training improvement
larger and
environment.
their
budget
&
teams advanced
engagement
autonomy into
onin from
for
5. the
to Review
for the
Learning?
(Eg:
welldate
efforts
Site
skills,
as how
to
L&D,
individuals
individualsStandardized
Are
informationknowledge
when
their
ittoutilizes
and
and has
slides
about
teams.
teams.
needed
input
the
SKAP that
achievement
from
training
Ifrepresent
for
you
tool;
ofthe new
find
pullplan
teams
any
&avarious
what to extraordinary
actually most performance people are not. and to amotivate
It is skill to be buttrained
they also like any
R3.2.11.
Learning
the
skills work Induction
initiatives
environment. process
andlinked Teams toimprovements
business
own actions needs are reflected
toorganizational
improve proper assess
needed
gaps, check toensure
interpersonal
change see consideration
based skills
iftothese on such
atneed?
have ifas
alreadyempathy,
Is itlearning?
inbeen
in the(Autonomous
issues
Active
enhance
induction
R3.5.11.
conditions
and
Learning
sites the tocommunication
further
completions,
Feedback
and review
Capabilities/
from
empower
Development
new learners
progress
the
abilities
hire
ATO teams
is
turnover,
is
within
aoffor
core
captured team
their
Supply)
across
and MCRS.members the site
engagement
in an action attoplan
all roles
belief 3.
was Talk
change from with
communicated
understand
processes,
diverse/inclusive
active
justifiable
identified the
listening,
the team
how
technology,
approach
reason?
by team,
Site they
EQ,
to
members
candidates
as
determine
can
timeorthe
well or team
improve
innovation)
address
as
allabout
(e.g.
management, their
the
levels
concerns.
plan
same
individually Areself-
to
the &
close
create
other skill. local cultures - like a culture
W This is not unique to leadershipof collaboration,
roles (yet most
R3.3.8.
drive
regardless
levels, their Sites
based own collaborate
of level engagement.Also,
on are or department
identified with Zone
opportunities. team People members Team to
know improve whom standard
department
6.
as Ask
there
5. a team.
Talk to
timelines
to template
see about
leadership past of is
their
and
need? being
and work
in team followed.
progress area members and Review
learning anything if their the continuous
vital there), improvement,
but of all teamownership members. etc. These can only be
scores
to
and make
R4.3.7. enhance improvements
Leaders the SKAP supporting Program the and team's it's efforts to improve
associated tools demographics,
control,
6. For
them.
SKAP any
tooletc. training
for educational
various experience, individuals background,inquireacross from skill
the Site
to turn
R3.1.12. to with
Employees a problem are encouraged and empowered to they
plans.
9. Checkneed Are 2:teamto
the do their
leaders
&associated
townhall job effectively.
actively using these successful if the requirements are transparent and fair and
R4.2.6.
R3.5.12.
their
R3.3.9.
R4.1.9. work Teams
Site
SKAP
The teamsis
can speak
leadership
environment, driving
and
to examples
implements
including
performance
individuals itshave where incentives,
learning
inclusivity.
and an positively
action
their feedback
impacting
plan in place
7.
L&D
3.
4.
Level
feedback
sets,
8. Talk
site.
Talk
etc.).
Interview
to
Are see
with teamall
For
regarding
team all
adepartment
any population
members
knowledge
members of(or
the communication new
at
assessments
members
similar)
based
materials.
all hires
levels
and
meetings
training,
and
Ask, strategy
in
being
also ask
thehow communicated clearly to all team members.
develop
drove subject
improved matter
communication expertise in the 1:1 interactions, in the guides
content
ask
has
them for
been
9. Review tofor ensure
toassessments recognition.
acted
data
describe onupontheir
how diverse team
orwork associated is
talent
comes being from to sent
knowledge
the
their to
performance
R4.3.8.
results
to address atThe reward
department
adepartment
site
gaps level. systems,
Critical
in Psychological has evidence
Roleand recognition
Team
Safety of and team
members program
members
Inclusive canbehavior.show are these
department
completed
leadership
formal materials
about
accurately
to understand theirdistributed
in work
aacquire area
standardized
what to
has learners?
and been anything
waydone
team,
R3.5.13. the Diverse learning or the site.
methods 10.
6. Talklearning
checks.
Discuss
partnered
position, to
First,
explainTeam isevents
communication
institutions thereto find
what one
and to
their out in ifresources
skills
understand
positionthey
place the right
understand
toisUnderstand
identifying
correlation and
between solving own
personal issues inare
skill development continuously
facilities see)and and evaluated
actively Inquire
they need from to leaners
do their ifjob these effectively. were
R4.1.10.
R4.2.7. Leadership's
The department dailycan"Gemba"show forconsistency
(go walks
in thesite are results. and
part of that
to on
raise
knowledge
through
assessment time?
awareness
enhancement/improvement
effectiveness
responsible and
dofor,
" skills
asking
knowledge
ofthey each
and
about
for
whoto the
/ perform
using
and
relationship
their
topic
the
understanding
activities
work
of
in (effort
their
right
goes the role? of
and
propose
R3.3.10.
routine improved
Communication
feasible
SKAP
with the is improvements
part of to
purpose
Strategy an Active
of reinforce
the Department,
those
Learning
positive conditions
Culture
behavior
Site
outside
where
andexplored, and in what
Zone
made
6. Critical
Psychological
Did
topic? the
resources
department
readily
they team
Have Team
theyhas
available
ifmembers
safety
employees canmembers
done
need
and
positively
and
to
who
them.
something,
should
which
receive their have
impact be
trainings
credit taken
effectiveness.
or
forifthe
and /tothey
(over)
R3.5.14.
their
employees
remove control. New arelearning
obstacles empowers
for teammethods and
members and technology
actively inseeking
the site.to are gain skill invested
next.
7.
interviewed
coaching Do
Interview
identify vs
they
issues outcome).
L&D
and
activities understand
with Site
asked basic
were "to
Team, the
conditions
explain
initiated SKAP/NIP
For various
their
especially and current for
Purpose, Priorities, Branding/Image etc. attending?
deliver
assessment
Key focus
process to on (and the
here Responsibilities
demonstrated
tools) are leadership
and which proficiencyand
communicationthis will
in
implemented
R4.3.9.
expertise
R4.1.11. The
Leaders at the
physical Site,
provide workand an shared with
environment,
inclusive the ZonePPE
including
environment team
thatisfosters as learning
fully general
performance
leaders initiatives,
services through in how the was
ofdepartment
the SKAP theskills decision
feedback or aresite.made loop.
best
inclusive.practices
7. Interview
directly
understanding
skills
necessary
to linkbuild
- understand
delivery totomembers
trainingcomplete
more
Recognition(
and the
in
psychological
knowledge
amechanisms
the the
certain work.Site
financial with
way. ToaIs
safety
leadership
inrewards,
passing
what place
there
for
level and
to
R3.3.11.
trust to ensure SKAPteam is fully implemented
members at all levels to include feel all levels of skill 4.
comfortable Can Understand
their
Learning the
nomination
score? teams. core
teams for team the to
special
feedback
members
discuss trainings,
mechanisms,
currentidentify being learningthe list
assigned
how of
evaluate
of Speak
proficiency these is skills (guaranteeing that those
development
sharing feedback inclusive and input of advanced to improve skills team dynamics, work evidence
(quickly)
required
5.
priorities.
special
8.
who Levelprovide 3:
of
responses
skills
to
Are
(desired)
a there
team
Review forneeded?
variety
feedback their
members
roles
are
skill
Learning
ofrole? methods
given,toabout
doCan
or knowledge
/ accelerated
can
achieve
what
Objectives
that
the heir
so confidentially)
are
happens
Critical
careergaps for led,
environment and performance (Proof: Feedback survey). autonomy?
utilized
with
team the
environment (eLearning,
member actions provide In-classroom/instructor
inside onto alignment
identified
paths,
executed
7.
9. Understand
Review extra for
training
the a- who
beer, particular
from
process
speaks
clothes
initiatives
the team? inthat
etc.)
Departments
of gathering
a meeting,
How
require about
&
feedback
R4.1.12. Teams members can speak to how their work virtual,
5.
withUnderstand
their self-study,
microaggressions,
across leader
multiple the onand
teams? etc.?)
People
their
fear Committee's
tIscurrent
work,
there skill
inappropriate
an routine
contributes to the Department and Site dream.
11.
8.
to Understand
behavior
management
from New
Identify
discuss
acquisition/
jokes
change
Hires/Job
several
work if the
proficiency
what front recognition
environment-related also
communication
movers. line
(as
observe
team
result Has it action
mechanisms
roles
of
employee
distributed
beenitems, and ask
plan
in
areusein or
behavior
to the that
place,
site comments,
&isisin
in real
in addressing
how time
alignmentthese moments
ortoplans. any
have
through
with of
gaps
been
the ask in
zone relation
designed
and inshow; terms to
as
R4.1.13. Teams can speak to how feedback mechanisms drive gathered for
how
per
are
of
individuals
particularly
assessment)?
encouragement,
theto execute
defined
Content, feedback
documented
behavior
Purpose,
learning
relation
Do on they
approach
results?
received changes
Design
throughout
operational
through (e.g.
Do
to /continuous they
meeting
introduce
needed
Brand
the exist? with
actually
Identity new-->
induction/NIP
Are they
performance
their manager being process?
executed
results.
have a development on/progress being
their engagement and improve performance. improvement
8. Interview
ones
changed / change
Consistency!
10. Review when the
the
etc. theteam.
reviewing
Buddy current Ask do leaners
ones)
employee
matching-process andplan have in
to
R4.1.14. Site can share a Best Practice on how Purpose & made?
6.
6. Talk
place
Understand
access
understand
performance?
to
Are
totoaddress teamsthey
various
how %who enrolled
toany understand
the gaps?
materials,
objectivity
in
localinHas anygo-to how
required
resources,
Recognitionthe leaders
personCritical job islook
Meaning drive Performance at the site. for
Team
and documentation
courses/experiences?
support speak them
member toSite in
them making
been ofabout complimentary
able changes
to close
anything to any anor
thatskill was
% aids,
awards
9. Ask
best/match learning
is guaranteed.
L&D modules
partnerships Team in
about order
between to new
involvement assist them in in
R4.1.15. Strong Psychological Safety and Inclusive Behavior in improved 9. Review
gaps?
raised How
to the
and doprocess more
they inclusive
know? for employee
To environment.
what feedback
toextent Ask
has
W driving
12. Ask
any zone-wide athem.
results? team Do
member
initiatives they know
about how
an example ask for or
the team drive improved performance. employees
gathering.
team
the
7.
sign members
Critical
Review
up for theandaction
Interview
Team
training
buddies.
as part
member various
plan
classes? ofto Ifwhichdesign
anteam
described
and assignment
it's
and
members.
meeting
impact thisany
develop
forwas
these
on
where
training
deemed
can they by based asking
""no
describe longer for
ondiscussedhow the
identified
abeyond? right
match"",
they need?tools/using
would was Havethe
provide the
buddy of
topics
DLs/Basic
people
9. Interview are
health being
skills
leadersdata and (TO,
about and
absenteeism,
various how frequently
members
tools
these
promptly
feedback
that
7. Are
available,
initiatives
happens.
engagement, reassigned
qualified back they
to
target
been Site
assessors
wereexecuted
(within
L&D?
achievement)
able
in approx.
Have
place
toforover-delivery
the
they
to 30 days)of
site?
utilized
validate
their
Have
and team.
onUnderstand
results
was they and
change Canwere
been they
assessed
captured identify
recognized forPIs/KPIs
as accordingly.
aeffectiveness?
part that are
this
7.
skill
8.
W channel
proficiency?
Speak
being impacted to before?
team from
due Is team
members toIs athere
assessment members
gap if anything
leaders
on of
their ifofteam?
the a formal
qualification
spend
13. Talk
Ask
process?for calendar
preventing
environment toIf them
People
change
is them from
inclusive and
attendance
was Team
doing warranted
of all or
so? members
deliverables
(equal what distance toproof see the is
to
consistent
most
Where time with
with other assessors
on the shop atfloor the site?
and
howTeam
Site
there
10.
restrooms
8.
the
L&D tohave
Interview
concept
team
support
members
the
forCriticalmen is looked
of
the 3R
responsible
and feedback
can
Team
for
has opportunities
improved
demonstrate
women, members.
for.
received
right how
size
Have and to
oftoall
remove
assist
engagement,
10.
acted
enroll
PPEs Walk the
upon?
in
obstacles,
forformal
employee
around
all, enough
morale, the
learning
coach in purpose
site etc.
acquiring
with
(10%)
facilities,
and
ainclusiveknowledge
member
courses, meaning of them
access
resting theor
as
describe
9. Understand
skill
people
L&D practice?
team, own currentasktheir from
Inquire
for agenda
own team
instances from items
developmentmembers
thewhen for their
employee if the 1:1 if a
11. Interview
resources
areas
meetings
environment
learning for at
younger
with
journey
all
is their new
point-of-need,
inclusive
has
hires/job
generations
leader.
been Isprovide
of established
all SKAP- e.g.and
movers
(equal feedback
available
and
distance
where
working
and skill to
14. Review
Learner
through
on
Wi-Filearning
etc.) need
their the is engagement
induction
content. considered. and survey
If it's
ask ifright a
theysize results
instructor-
have
proficiency
restrooms
discussed
led solution, for
part
with men
inquire of regular
them. and how women,
an discussions?
employee Can
isabout of allto
regularly
11.
they
PPEs
10. Pull
describe
forforLE established
all, for the L&D
their
enough current 1:1training
facilities,
conversations
proficiency budget.
inclusive toof, Isable
atgreat
resting
theirInterview
sign
than
minimum
areas
up
performance
90%
for younger
or
levelor be
Leaders
all given
ofwith
Basic/DL it used
generations
andspace
with ask
by
Skills? their to
end
themattend
- Doesleader.
e.g. it Do
of available
the
explain
the year? they
how
learning.they
understand prioritize
theassessed learning
development toplan strengthen in itplace thenfor
If not, etc.).
correlate
Wi-Fi
PI/KPI isresults.
there
with aHave plan they in place skillbeen intothe use
successful for ain
11.
them Interview
training to fill
need gaps? employees
by theAsk leaders about to identified
see
corresponding
10. Speak
creating
solutions. space
documentation/capturing Istothe all SKAP
for anend
department
learner tool?
employee of Can
able
themembers year?
to accessthe
to learn Are
Critical tothemand thein
initiatives
Team when
understand
return,
easily member that
documented their
they
were
describe spent
definition
need a PI/KPI aof
them?
money feedback
development
of an on linked
inclusive
strengthening?
Do they
provided
feel plan workto
to their
business
that has employee.
improvements
been aligned to that in were
acquire needed
environment
Ask Leaders,
comfortable
12. Interview
(PI/KPIs)?
and
using what
new
ifthesuch
behaviors
hires/job
is
solution movers to required
place.
have gain specifically
and new ask
skills?
Can
11.
changed
knowledgethey by
Understand describe
orthe skill? which
team a current as good skill
the practices
result they of as are
were
accessing
them
12. Ask
working
shared to&Sitedescribe
on with how L&D whom their
for
willany
itsolutions role's
impact inputs purpose
locate fromPI/KPIs? theitformal
learning?
12. Testto
relates out site any Dream (including potentially
feedback
CanReview
12.
11. critical channel.
team
the
PI/KPI Areand
members
engagementresults these KPIs. captured
explain
survey Inquire howanalysis onabout an
sitting
what
action in
their
plan onteam formal
that is
is training)for
working
reviewed on for
and
the
to ease various
continuously
addressed? of use. team Is
acquisition
and
the how
inquire
solution theof about
the skills
Diversity most willrealistic
learning &increase
Inclusion
experiencefor their questions
filling level that
the of are
have
improve.
13. Inquire Ask, from how is leadership:
the new hire/new mover
autonomy?
scored
taken
need?
working place.
Are to TheSite
employees
make useindividual
an ofable training to gain impact
Are
and there
subject toAre their
learning
9. Review
coaching/mentoring incentives,
leader/employee performance calendars. rewards
matter
teams
systems, expertise
performance?
or recognition andshould practice
Validateprograms
correlate
application
this in against with in
place.
PIKPI a
regular
results
safe way? 1:1s
gaining. Are happeningthey given consistently?
feedback about Is there theira
leader
14. Is
routine priorities.
there
that evidence
has SKAP of & their
development reception in
plans
12. Ask
Interview
application?
13. local team
siteof L&D members Team" and howask theythem interact to
engagement
listed
explain astheir a topic data?
process Interview
discuss? forthe asking employees:
for additional what
13.
with Inquire
other from Site L&D what
zonePIs/KPIs are
andtop
is
10.theTalk
resources,
priority for tomembers
perception Critical
tools,
the Site
ofTeam
or the
and
of
training recognition
any members inthereordera
to share ortoincentive
and doleaders:their
implement
programs? best
arean practices?
they utilized Iscorresponding
As
jobs.a result
learning
MCRS/TOR. They solutionsof
should Action
aligned
belog?
that ablehave Asktoto
development aid the learning
describe
beento see or are theplan,
being
experience?
what
formal types
process. of skill Have acquisition they used learning the took
process?
developed
implemented
15. Interview forthe bestindividuals
L&D practices orteam: a team.
gained
SiteCoaching/Mentoring? How fromWhathasother are
the
place?
13.
the Leaders
associate Formal ask Training?
behavior their team changes members that Power what
need they
locations
same learning
OJT/Experiential
need/want
across content the
Learning Zone. been Are here
deployed?
through assignment? Hasto to
happen
Point IfDecks,
certain by to
execution
learn.
individuals
resources, methods
There onorthe is a planto
team
materials
been more
inthat place
improve
effectiveare
etc.?
accommodate
the PI/KPI? possible, this, ask to see
prioritizing any thosedocumentation needs that
shared
for
that theiswith with Is
team
being the
based there
utilized team on evidence
toand staycredit
your of
evaluation?
on track.
a correlation
given toHow other of
align
improvement?
teams? business and/or people strategy
have
11.
14. Can youCritical
Employees adjusted team
have and improved?
members
fun or look describe
forwardIs there to data
14.
14. Ask
that you L&D
Inquire have from tocollected
show
new formal
hires thatifcore evaluation
they
can showhave positive process
been
instances
learning.
of critical where
Learning
learning an isintermediate/advanced
at
solutions. the Evaluation of Site values
should skill
presented
progress
gap wasaclose to
as result providethatofresulted their
the feedback
change? in improvement about the
15. Interview
include
process. link various
Was between
it easy team
for the them members
improved at a and
PI/KPI
16. Interview
personal
variety
the following:of performance?
levels the
1) :AskL&Dthem Site Was team:
how a to PI/SKPI
they
do
What so?
learn new
at the as a
Formalized?
L&D
site
part level
ofmethods improved?
bettering
Whereor understanding/knowledge
technology
their
they followed-up
performance? has been with when
needed
changes
explored? by were the implemented?
What team was 2)
piloted Behavior and thatCan hasthey
12. Review
describe
changed Zone
instances
asturnovera result People
where
of consuming team
something & ultimately
Site thebest Learning
they
learning
15. Gather
implemented?
routines and Is
communication there data, evidenceengagement
notes. this Is SKAP scores,
learned
and 3) the
induction contributed
Site
completion performance Site
timeframes,strategy? that Inquire
changed
that can how
as a
show
practice
actively
learningand was
discussed?
is viewed shared atAsk at
the for the site. Zone
any Doformal level?
team
result.
before
17. Inquireprovided after the
from process/program
Zone People team, has
feedback
members
improvements feel their
have
to
leader
been
the Zone supports
made
People them team by the to
site
improveshared
creating the
time any
process
and best space practices
for the for them Site. that tohave
Is itlearn? been Can
implemented
documented elsewhere?
in
the team member tell you about new or an action plan?
13. Review theofSKAP
strengthening their subject tool andmatter compare expertise? to site
Pis/KPIs. Look
16. Walk around the Site. Are there access at a specific team or
department's
point of learning usewhere of theemployees SKAP tool.can Is there be
correlation
found. Utilizing between technology? gaps being in a filled physical and
increased
location? performance? If there has been a
site-wide initiative review for correlation at the
Site level. Is the improvement sustained over a
period of time?
14. Interview Critical Team Members: Ask them
to explain how they have upskilled (acquired
skill) to impact their team's performance overall.
How are the employees driving their skill
acquisition to improve the team performance?
15. Interview employees and ask them how
they are able to gain new skills for their role.
What is driving them to acquire skill
proficiency?
16. Review SKAP tools and resources
(including assessments) for the site. Are
advanced skills accounted for in addition to
basic and intermediate skills? Are employees
who have accomplished basics/DL and
intermediate levels being evaluated for
proficiency on advanced skills?"
Questionnaire - Dist. Planning Pillar 73%
Reporting Period: Targets : 73% 68% Mandatory: 1
Facility Name: 68%

Question
Mandatory ID Question/Topic Requirement Scoring Guidance DC Comments & doubts Global Owner Feedback WH - DDC WH - ABI #REF! DEL - DDC DEL - ABI #REF! DDC
Weight
DIST. PLANNING PILLAR N/A N/A N/A N/A N/A N/A N/A
FUNDAMENTALS N/A N/A N/A N/A N/A N/A N/A
1.0 BUDGET MANAGEMENT N/A N/A N/A N/A N/A N/A N/A
Yes 1.1 Budget Process, R1.1.1 - DC RACI is in place showing accountability of warehouse, delivery and fleet packages. 5 - All requirements achieved Purpose: The budget process allows DCs to contribute to the building of their budget based on KPI and volume and 1 N/A N/A N/A N/A N/A N/A N/A
1.2 Creation,
Cost and LE
Monitoring The owners
R1.2.1 - A growth can speak financial about theirisinvolvement
metric tracked in the in the Zone/BU
monthly budget
financial review process.routine; DC EBITDA or 5 3 -- All R1.1.1, R1.1.2, R1.1.3
requirements and
achieved negotiate After
Purpose: with BU/zone teams.isBy
the DC budget creating
built, a simulator,
it is helpful to trackthe DCmetrics
cost can anticipate
to showpeople
growth and fleet resource
or improvement in needs. This
your DC. budget
This 1 N/A N/A N/A N/A
N/A N/A N/A
R1.1.2 - DC created a budget simulator from the BU volume projection with headcount and fleet. 3 R1.1.4 are R1.2.2
achieved,
andbut R1.1.5
areis must also can
be monitored to control
actionscosts.
2.0 RISK MANAGEMENT Net Revenue.
R1.1.3 -- Operations DC built a budget foristhe current
- R1.2.1, R1.2.3 evolution help validate your DC is taking to improve costs and by benchmarking with other DCs in your BU
N/A N/A N/A N/A N/A N/A N/A
R1.2.2 VLC/HL tracked in year after final
the monthly budgetreview
financial is negotiated routine with DC committed achieved,
and management missing but R1.2.4 is missing cluster, this can drive even more growth!
Yes 2.1 Permits and Licenses can champions
R2.1.1speak - DCabout initiatives
RACIimpacts integrated
is in place to this showingand
metric.requirements accountability and DC management team can 1
has budgets of global performance & cost Sustainability KPIs 1 --- R1.1.1,
5 All R1.1.2
requirements
R1.2.1 and and
R1.2.2 R1.1.3 arebut
achieved
achieved, -Purpose: Work with The BUDC support
must have to understand
the proper budget
documentation negotiation to process,
operate in champions
a legal way. process
This questionand DC involvement.
ensures the DC Thishas is helpful
a to 1 N/A N/A N/A N/A N/A N/A N/A
for Right to Operate (at minimum).
speak
R1.2.3on how Management
to a maintain team
the Stoppage
right
ops to can speak
operate. about the budget's connection with the Sustainability achieved,
3 but others are missing see in a with yearly timeline so DC knows when they should onbe involved.
Yes 2.2 Risk Assessment, R2.2.1
KPIs. -- DC DC has
has doneWorkplacea yearly VLC/HL Riskbenchmark
Assessment with at least
Matrix in placeone DC thatinhas their cluster
been to
reviewed 5
0 --- All
others R2.1.1, R2.1.2, and
are missing
requirements
R1.1.1 and R1.1.2
R2.1.3 are
achieved
are not
register
- EBITDA
-Purpose: DC should
andthese
The have
Net
workplace documents
Revenue
package stoppageare
owners
updated
standard
risk
defined
and
assessment, the team
financial
for operations
DC's cost
metrics
response site
centers
is plan
tracked knowledgeable.
throughout
- aand RACI business
is helpful
ourresumption
business atplans ABI. By is atracking
very the DC's
important push part this of 1 N/A N/A N/A N/A N/A N/A N/A
Response Sizing R2.1.2
identify
and Business R2.3.1
in the past - DC has
opportunities a register
toon drive of all
aDC safety
100% and
mindset environmental
in budget legal
planning. requirements according to local achieved,
0 -- R2.2.1, but R2.1.4
R1.2.1 isR2.2.2, is
not achievedmissing. progress of EBITDA and/orthe Netteam Revenue, the andanticipate
commercial teams cantocost define ownership.
observe the performance Work to
and ourwork
2.3 Resource R1.1.4
and country-- DC DCyear packagebased
utilizes
legislation owners
volume the
for the aandhave
DC.
reality
toa deliver
special monthly and potential
event routine
information inforplacerisk.
gatheredChanges
to analyze fromfrom budget
the S&OP previous version
performance,
routine as are
an 5 3
achieved
1 -- All requirements
R2.1.1 andR2.2.4
and
R2.1.2
R3.2.3 are
achieved planning
ownership
Purpose: pillar.
down
Understanding Thistocan allows
managers volume below trends to
DCthink manager
and proactively
sizing to drive
people and connection
and fleet ofrisk
in people,
an DPO to reduce
operation means, is veryKPI impacts
results
impactful and
and service
toitfinancials.
the VLC to performance 1 N/A N/A N/A N/A N/A N/A N/A
Resumption R1.2.4
recorded.
identify
has performed cost POC level analysis at least 2x/year to understand achieved, but isare achieved,
missing. -together
customers! As this question
to drive profitabilitybe owned of the by DC.multiple This parties
should (safety,
be checked planning, monthly and commercial,
cascaded to fleet,
the etc),
management is important
team. to define
2.4 Facility Maintenance input
R2.1.3
which
R2.4.1 into
R2.2.2POCs ---root DC
DCthecauses
DCand
sizing
has
created
are
has owners
most
created
of
processdeviations
a costly and
facility at
due
to and
aservice.
DC
dates
maintenance
a Workplace
create
definedassigned
Stoppage
action
frequency
checklist to plans
all
Responsewith to close
between
permits Planand
critical 1gaps.
and
licenses
maintenance
aligned
6 months
with theenabling
inZone/BU
items register.
marked.
guidelines
3
but
5 - R2.3.1,
1 -- All others R2.3.2,
are
requirements
R2.2.1 and
and
missing
R2.2.2
R2.3.3
achieved are - VLC/HL
-of
aPurpose: Volume
a DC.with
RACI Byshould
is building
DC aowners
managers
metric come forfrom
better
and the
are BU
the top
setcommunication
operation
responsibleroutine down to
taking forchallenge
with
ensure
the S&OP
variable alland
facility and
documents
spend use
budget, the
ordering
into budget
arebyplatforms
soaccount in scenarios
compliance.
creating by HL gettodaily
atoroutine
sold. adjust
This is headcount
accurate
a goodvolume/stops,
to specifically high
focusandlevel fleet
and metric needs.
reviewthe to DC can
items
work 1 N/A N/A N/A N/A N/A N/A N/A
R1.1.5
warehouse
R2.1.4 --- The DC
All package
necessarydelivery owners hashave
execution.
permits and a monthly
licenses routine
are visible withandPPM totodate.
upThis reviewat performance by cost achieved,
0 -- R2.4.1, R2.1.1 but R2.3.4 isare achieved,
missing. - This
mitigate Headcount sizing should
risks include
and set all
the employees;
warehouse in aown, and temporary
delivery teams and up 3PL. to be to successful in execution.
MANAGE TO SUSTAIN R2.4.2
in anticipation
center and
DC
update
manager
of defined
the LE. potential completed
risks from thethis facility
risk checklist
assessment. quarterly,response minimum,
from plan
and
includes ifan
any 3
but others isarenot achieved
R2.4.2, and
missing R2.4.3 are --to
that improve
the
Clarifying ensures
DC andhas
the weby are
looking
defined
difference operating
as atcritical
the
between our
DC's and
the DC cluster,
non-critical
risk
andassessment
legal
can way
benchmark.
maintenanceand
in safetyhave continuity
items
and planning to get
review isthese
pillars very documents
important
- safety pillar updated
tofocuses
ensure on ainsmaller
the event
assessing issueof
N/A N/A N/A N/A N/A N/A N/A
R2.3.2
items are
escalation
- DC out has
of compliance,
matrix with
parameters
responsible criticalcontacts to alert
items are the
andenteredteam
includes
to
forsize differently
emergency
topics of service CAPEX level,
budgeted
orlabor,
fixed. and 1 - R2.3.1
Non-critical achieved,
0 - R2.2.1
and
but
is
R2.3.2isare
R2.4.4
not achieved
achieved,
missing. -- Cost
turnover.
does
workplace
Fleetnot should
to deliver
grow
safety
include
atrisks
into the
a largerall
POC ways level
problem,
and planning
to movecanpillar provide
causing deliver
assesses impactful
additional product;
risk visibility
expenses like into trucks, thevans
efficient
toevents DC's and
and
budget MHE;
inefficient own,POCs
and/or 3PL, (especially
emergency SPOTCAPEX. and in crowshipping.
terms of
3.0 SHORT TERM PLANNING headcount/fleet
items out ofadjustment due to overage
compliance are prioritized or lack to of bemanpower/fleet.
fixed. but
1 - R2.4.1 others and
are missing
R2.4.2 are achieved, -frequency Each year,
Work withand/or sales/commercial
the DC service should participate
time). teamThe on team ainroutine
the
canchampions basis
utilize thistoof external
process,
get
visibilitythe most tocommit accurate
discuss toand potential
initiatives
sales information
opportunities and workplace
likemonetary forstoppages.
changing regular
commitment.
frequency,
Both
sales, are
This
propose N/A N/A N/A N/A N/A N/A N/A
forecasting
R2.3.3 -- A DC is RACI
using is a SOP procedureswithshowing to mitigate
steps tomaintenance risk,
take to reduce at minimum.
or increase manpower/fleet and can 0 - R2.3.1 is focused
should be on the
included reality of
inpromotionsyour
the budget DC! negotiation process.
Yes 3.1 S&OP Routine: R2.4.3
R2.2.3
R3.1.1 - DC DC has
sales a and
Business in place
operations Resumption teams attend
Plan thata weekly
has execution
been S&OP accountability
reviewed
meeting in following
the past including
year
the Global
and TOR. but
5 - others
All arenot
requirements
achieved
missing
achieved -innovations,
-delivery DC managerswindows, events, service
should review times
andpast
and
and price POC
other
maintenance increases. variables
items, towith
and iscommercial
common ofissues teams.
among This can
thedifference
DC be used
and/or as a valuable
zone/BU torisk
create input a into
speak aboutsales, instances ofand/or
this happening at the DC. -Purpose:
the
Review
The
Bycustomerbudget
looking this
Theatmust division
weekly
volume
clustering be withsales
reviewed
months your
analysis.
DCoperations
monthly,
out safety
and atsupport
putting planning
minimum togetherteam meeting
to an ensure
understand
SOP one
for the teams
the most
deviations
increasing know toimpactful
and the
the budget
decreasing and andvaluable
between
a planmeetings
volume, must
you thecan beput for
put the DC.in
in place
actions 1 N/A N/A N/A N/A N/A N/A N/A
operations,
adjusted if necessary. fleet,Business 3rdattendance
party teams. 0 -- R3.1.1, R2.4.1 isR3.1.2,
not achieved facility checklist and mark critical to items. Ideally visuals would be added to OTIF
this for the DCnorth manager to NPS!
show the expected
Yes 3.2 Connecting Sales
Forecasting and R3.2.1
Routine: TOR
R2.3.4
R2.4.4
is -owned DC salesby both
passes and this teams
sizing
operations offResumption
and to
teams the attend Plan
warehouse must
is atracked. andinclude
forecasting delivery valid
meeting teams vendorto contacts
enable
according for labor,
tofinancial
easily and
toZone/BU
3
5 - All requirements and R3.1.3 are
achieved assessments!
This
to
place
Purpose: getbrings thehelp
to costs
The Sales
together
reduce backand
forecasting team
the
under
service teamsmembers
control,
level,
meeting speak ifshould
aover
productivity
is time about also
budget.
for and
thebeDC
volume, consulted
cost supply
impacts
sales and in
chainthis
to process.
loss,
your
operations DC. (mainly and our
warehouse) starteamsof
uptowalls,discuss etc)forecasts 1 N/A N/A N/A N/A N/A N/A N/A
software,
OperationsService Level standard
R3.1.2 --success DCoff manager
Customer sitewithin
storage,
Centrichas an
andKPIs,updated
rental
ofvolume,
database
vehicles, at of
a forecasting vendors
minimum. metric, available
SKUs to at
for DC
Risk team
and Obsolescence achieved, but R3.1.4 is R3.2.3
missingare condition
--Purpose: Some
The PPM
of
examples an
routine
item ofmustexternal provide
bewith events
adhered
things areand
to
tonatural
look
the
for
DC
(water
disasters
must
leaks,
like
give
ice
flooding,
feedback
build up,hurricanes,
fire,
to ensure
broken furniture,
the to tornados,
LE
marked
is adjusted extreme
based heat/cold
on thebe DC'sweather,
3.3 Routing SOP and Skills results
Mitigating reference.
R3.3.1
R2.2.4
are reviewed - DC following
has
andawhen
management
the
SOP 1Global
month
for
out the
team
TOR. execution
routing TOR
is ablemetric,
of compliance,
is
process
to speak
and
owned
there
feedback
which
about
by accounts
both
areataction top (over
is given
teams
DCfor
3plans
and improve
attendance
inunexpected
risks, placethe to response
the sizing
is tracked.
routing
improve.
process. of 3
situations
plan to these 5
- R3.2.1,
1 -- All
R3.2.2,
requirements
R3.1.1 andR3.2.4
and
R3.1.2achieved so
--etc.
It is critical
volume
Checklist Routing to review
planned
can be is onand this
a paper what
critical orstep your
isdigital, in warehouse
incoming but
connecting is
should and
as accurate show
commercialdelivery as
gaps teams
possible
in
to totoalign
the assessment
operations reduce inon aover
anrisk planof the
efficient SKUs ensure under
previous
way. Thetheseand
quarters.
goal teams
over
is to can
range
create soaofset
ourupas
plan 1 N/A N/A N/A N/A N/A N/A N/A
and Cost Impacts R3.2.2 - Obsolescence, a forecasting SKUs risk and under), and theoretical
toIfalland out of achieved, but isare achieved,
missing reality.
for
customers
-- Vendor
DC should
success get follow
when
database the it the
product
comes global they
to standard
execution.
want, on TOR time forand S&OP in full.(at It minimum)
is also and have
important to owners
have this ofroutine
topics assigned.
to reduce The
supply idea chain this
3.4 Matrix
Critical Period Plan over
risks capacity,
R3.1.3
R3.4.1
stock and
are -- DC where
SLA(s) has
monitored
pushed
the
are
a critical
and
volume,
business
aligned period
action
and/or
resumption
between calendar
plans
weather
teams
are plan
based
in andis
place
impacts
located.
monitored
on to prior with in
closeyear
a plan
gaps the
sold
with
to
defined
dailycommunicate
frequency.
volume,
necessary OTIF,
teams.
3
but
5
1 --- All R3.3.1,
others
R3.2.1
R3.3.2,
are
and
and
missing
requirements
R3.2.2
R3.3.3
achieved
are
are
achieved,
close
TOR
Purpose: Some isas to possible
examples
bring
There ofideally
to
together
are the
workplace
times the should
execution
when sales, the be on sharepoint
utilizing
stoppageslogistics
operation accurate
would
and has be aso
support spikeallteams
master
strikes, team
indata,
active
volumemembers
such execution
shooters,
as people
due can refer
data
etc.
to seasonality,andand tolocal
this, add oretc.
people/fleet
BSC/support
events, update
costs. and teamcontacts!
should and give spend 1
extra 1 N/A N/A N/A N/A N/A N/A N/A
stakeholders.
consistently Global
underperforming Routing TOR
KPIs is in
existare place
from and
R3.1.2,At routines
DC are
canthe set
show up to
examples close gaps
ofperiods
SLAs between route achieved, but R3.3.4 is missing -losses
-A Work RACI from
with should obsolescence.
your be
Zone/BU in place teambetween to gather theand different
a standard itparts processthe operation
to impacted.
gather toand 3rd party
potential risks, vendors,
assess, atcreate
minimum. amonthly OtherS&OP
response things
and to
4.0 CUSTOMER CENTRICITY absenteeism
R3.2.3 - Ifand DC tohasshow 10% days or morewith service
SKUs level issues.
forecasted minimum,
within DC, three an critical
inventory policybeing
should used
be 3
is in place 0 -- R3.4.1,
but R3.1.1 and
others and
are R3.1.2
R3.4.2, andare
missing not are
R3.4.3 hour
attention
-add
per week
to these discussing
periods the
to operation
ensure service tohow customers can be isimproved
not ensure The service
critical level
period and budget.
definition,
N/A N/A N/A N/A N/A N/A N/A
planning
to close
defined
for these gaps.
from
SKUs.
execution.
the analysis to create the critical period plan. 1
achieved
achieved,
0
- R3.3.1
- R3.2.1 but
and
R3.3.2
R3.4.4 are
R3.2.2isare
achieved,
missing
not resumption
routine DCare
Global salestolinks
Routing
team
plan
mitigate to vendor's
TOR
to
should apply
risk should
and contact
provide
toSWOTyourbeaDC. information,
reviewed
daily
analysis sales daily,
after SLA
volume but
the ofdoes response
forecast
critical not time/vendor,
need
orforlocal),
period the toupcoming
are be a call.
important etc.week.
and to
If thisensure is
DC a call,
should
are it should
show
completed beinalast
the quick meeting,
theweek
planning planned
to
Yes 4.1 Customer Centricity R3.3.2
R3.1.4
R4.1.1
R3.4.2 -
-
-- DC DC
DC has
can
level
reviews a
showprimary
NPS a cross
survey
the critical and wasbackup
collaboration
pulled
period plan router
for defined
plan
the
monthly between
past in
three
in the tothe skills
sales
months.
S&OP andmatrix
meeting with
operations
For NPS, completed
the
anddelisted teamsteam
if criticalSKUs DC
with
period routing
events
analyzed is but
5
1 - others
All are missing
requirements achieved
- R3.4.1, R3.4.2 are achieved, but --reduce
less
daily
Purpose:
DC
In somehas
than
sales
set
15
zones,
NPS
service volume
a routine
minutes
is facility
our
level versusandwith
North
impacts
the
maintenance
always
sold
forecasting
in and
Star prior
towith
the if there
show
future!
team
istooutsourced,
the isrouting
customer
(centralized
a variance session
but itabove
satisfaction should begins.thestill
with Ifbe
target,
our
sales
aservice
call/zoom
a there
priority operations
for
isproducts!
should
and not
thebe teams
optimal
DC manager
By for
actions
to review
toyour to define
close
reviewing team,gaps.
all parts
global
this
the Bycould
RACI
ofnotNPS, be 1 N/A N/A N/A N/A N/A N/A N/A
R3.2.4 in
OWDs DCthe has worked
rolling year. with forecasting and zone teams ensure new and are achieved
0 - R3.3.1 and R3.3.2 are not forecasting
with
a thisteams
standard team TOR.
email and This
or discuss is aligned
checklist what (onthe issite)
in/out the
focused zone/BU
of compliance
on required
the and
topics frequency.
review
within SLAs
the TOR. with If this
there team are ifaWithin
service
lot of driver is operation,
notfeedbacks
adequate. or large
4.2 Analysis and Plan to expose
primary
upcoming,
set up properly and teams
secondary
routine to
in the the
is inERP whole
feedback
place and operation.
for
to communicated the
follow Critical entire NPS
DCPeriod
to DC metric
Planning
team. to explain
TOR in NPSseparate gaps. meetings. 3
others - R4.1.1,
are missing achieved are
R4.1.2, and R4.1.3 providing
our
- DC should DC an accurate
can
review focus forecast,
on
aisforecasting creating DC
metric plans
of inlogisticsto
this work team
meeting with will not
different
(bias, be able
teams
accuracy, to tosize
increase
top 5gaps properly,
misses, NPS. impacting
etc) and OTIF
the and NPS. Rate My
Customer Clustering R4.2.1
R3.3.3
R4.1.2 -- From Zone/BU
Daily routes has aregiven created guideanceusing aforglobally define
aligned 4 routing
customer clusters;
solution thatand Winner,
toupdates
Grower,
POCperiod 5
details achieved,
achieved - All requirements Purpose:
--deviation DC shouldteam
Across
gaps,
should
ABI,
this review
we
a good see time
customer
a trend to attend
centric
serving
KPI a call (delivering
and create
performance
to)a
(OTIF,
many
planare accounts
to
NPS, closeRMD)
in the
and with same
add the DC understand
way,
actions
not considering
frontline
if out aofteam!
wherecustomer
compliance
gaps are to
withDC
1 N/A N/A N/A N/A N/A N/A N/A
4.3 Plan
Flexible and Express
R3.4.3
Basic
and
R4.3.1 &--- Low
order
After
DC
the critical
the
Sales
information
has
NPSbased
anunderstand
SOP from
analysis,
period
inon the the
place ERP.
the
ends, DC
variablesThe
the
on performance
used
DC
the approval
other
discusses
of revenue,
routing tool
metrics andlike
growth,
andconsiders
makes
prioritization
OTIF,
and
costs 1 RMD
changes
ofadditional
of
free,fleet and
flexible
Customer
the
cost critical
variable,
people.
and express at 0
3 --- R3.4.1
5 R4.2.1,
All
but
and R4.1.4
R3.4.2
R4.2.2,
requirements
isare
and missing
not are
R4.2.3
achieved
Delivery
create
cluster,
Purpose:
DC (RMD),
arevenue,
more
We
use
know
On
agrowth
accurate Time
calendar
that byor Incost/profitability
forecast. Full
to
giving
view (OTIF) daily
flexibility
and
volume,inCustomer
and deliveryOTIF
express
Complaints
and absenteeism
service
deliveries, or prioritization.
the DC
3 metrics
to define
can This that
increase
these are
tends captured
critical
to become
revenue, POC
onan
periods. daily
To define
issue
growth
basis
when
and NPS.
within
critical
the the
By 1 N/A N/A N/A N/A
Complaints to help NPS and updated the Customer Centricity Action 1 - R4.1.1 andR4.2.4
R4.1.2 customer centric KPIs. N/A N/A N/A
SWOT
minimum
R3.3.4
analysis.
(frequency, cost to fulfill/deliver, drop size, etc) achieved
achieved, but isare achieved,
missing DC
periods,
- DC
has to help
should
capacity reviewour ensure
issuesteams
instances they indicate
andadoes arewhen whether
OTIF
receiving
not havenew waswea plan can
low anticipate
as
andtodelisted this is
prioritzeproducts an changes
indicator
customers in
inside NPS.
we did
their
by cluster not ERP meet
to give our
andthem customer's
work differentiated
with expectation.
the forecasting service. orservice
BU team
This
4.4 Delivery Service
Proactive orders
Plan
R3.4.4
Service Level R4.4.1
R4.2.2 toin ---address
Aall
DC
DC
DC can
has
has
RACI
steps the
a
run
of
showSOP is
the
largest
this
ininplace
order gaps
involvement
place
analysis
showing
and toof
delivery
across
inDC
analyze routing
the
thecustomer process.
full DC.
Zone/BU's
and and
flag master
Actions
peak season
orders
clusters
data
with
and
ownership
incorporate incentive
issues.
compared not
At to
with
only
program.
minimum,
their
update
the DC
This frequency.
duplicate
customer program
centric
3
but
5
1 --- NotR4.3.1,
others R4.3.2,
are
available
R4.2.1 and forand
missing
R4.2.2
R4.3.3
scoring are -If
-having
-to
Purpose: DC Routing
Some
ensure should Ourisreview
ainstances
plan
products
Centralized:
for giving
goal Obsolescence
ofwith
arecriticalBEES
able
differentiated
periods
to theis tothe
beand by may
give
received both delivery
come
autonomysales
in the
service,
fromand
ERPtopricethe and
adhering
operations increases
customer
physically
totonot
buckets this
place
when
andorders,
properly monitoring,
discuss
product communicated,
but
arrives at we
actions times
to
can
to
DC.we ensure
mitigate
events,
tohave
the
risk.
weather
issues extra with andtheand 1 N/A N/A N/A N/A N/A N/A N/A
R4.3.2
operations -out DCteam,
ofreviews but utilization/adoption
DCfull sales, BU, or zone metrics teams. for flexible
The DC and express
manager deliveries
connected bythe onlargest
a monthly NPS 3 achieved,
0 -- All
R4.1.1 but
and R4.3.4
R4.1.2 isare achieved,
missing
are not
question
- If
given
-holidays. DC should
created
gives
isisimpacting show
inmonitor
more
a good the structure
SOP
operation
way, of
SLAs
for
canrouting DC
POCs
help
to
bring
work
solution
positively. with
for
attention
the
unexpected BU/Zone
tothe issues
team
routing
of service
to define
situations
between
standard
and suppliers
ways
communication and
cluster plan.
customers.
customers
By creating
MANAGE TO IMPROVE Management is communicated
orders,
metrics of OTIF route,
andto theand
NPS/RMD high DCrisk team.
by POC
customer orders should
cluster at be captured
minimum of for approval
2x/year. DC but requirements
others are achieved
missing -- What
ordering
the DC
The DC should NPS?
process.
focuses
solution
Customers
onIthow
should theyare
isobsolescence
important
consider will asked
that
costsputand we toit's
processes
of people
take
put a this
plan
contributionin NPS
and
in place
place
fleet.
survey
totoPeople to
service on a
flag
DC's quarterly
orders
SCL
these
should
with
budget.
customers
consider
basis.
potential
Plans
the
This is a comparable
issues
should
according
DC's driver
and
be
to used verify
cluster.
and/or
metric
towhether
reduce withrisk other
intentional
of future N/A N/A N/A N/A N/A N/A N/A
basis.
gaps to-DC
management
R4.2.3 From delivery
team
this and warehouse
before
analysis, the DC routing
has managers
a start
plan time.
to giveto create
direction an to actionable
appropriate plan. teams on inventory
1
achieved
1
0 -- R4.2.1
-
R4.3.1 and
R4.4.1 and R4.4.2
and
R4.3.2 are
R4.2.2
are achieved,
are
achieved,
not
powerful
companies
-obsolescence
or Once
a mistake. the SLAs soThis
critical ittomakes
and bring
period
isthis increased
it plan
important
is easier
a isas
critical to itattention
benchmark
created, can
meeting helpthis tous
to anand
should
help issue,
reduce improve.
this. both
be beer reviewed teams
NPS
going on should
isfor composed
a amonthly
ride; agree of on
basis
picking, the
3 categories
in service
the
loading, S&OP ofand
driving to helper
work
assessors,
meeting POC, together pay
if Promoters
periods
restocking, model
to close
are and
(9-etc
R4.3.3
R4.1.3 --- DC DC
NPS reviews
evolution theand sales
toCustomercurve index on a monthly basisis for trends and this to analysis feedsat but but R4.4.3 others are missing can
-10),
gaps! DC include
doeswaste! not the(7-8) daily
have tosalary
have per
BEES route, to 2nd
implement route cost
flexible and/or and variable
express compensation/case.
deliveries, but it isfor Fleet
important shouldto aset consider
the right itthe fixed
approvalto cost
5.0 MEDIUM TO LONG TERM PLANNING
R4.4.2
allocation
into the
has a routine
prioritization,
territory plan. routing, and theCentricity
communicate all order
delivery Action changes
experience Plan and
by reviewed
cancellations
customer and
cluster.updated monthly,
customers. achieved
0 - R4.3.1
is missing
and R4.3.2 are not -upcoming
is
and
parameters, Use Passives
a huge
DC should
Zone/BU
cost/KM
and have
or
MOV
extra an
guideance
mile.
andfocus
(minimumDC
Detractors
inventory should
to order
should policy
cluster be
be (0-6) on
DC
able
value/quantity)
and
the
in placecustomers
to show
calculates
critical
by this.
SKUor
period.
andfeesif acompare
moreNPSDC
that
score
should
than
do not 10%
these from
impact of -100
follow the
clusters thetotal
the
to
to 100
global number
your
service
the
Critical
service
level ofDC SKUs
and
as
Period
level are whole
Planning
results.
ensure forecasted
sales
asTOR
is within
aligned the N/A N/A N/A N/A N/A N/A N/A
5.1 Territory Plan and minimum,
Order
R4.2.4
R5.1.1 changes The during
DCand the
acan S&OP
cancellations
show ameeting
SOPare of according
included
how they to the
in
cascadeGlobalDC's S&OPOn
clusters TOR.
Timeafter (part of OTIF)
analysis withcalculation
full DCthe teamswith 50 -- All R4.4.1 is not achieved - Create
-encompasses
discuss
DC In order
(not toplan
topics. drive
centralized).
a all more
toparts This
differentiate understanding
of our
feeds serviceintotothe
service to and collaboration
customers.
warehouse
between customers NPS
inventory between
is using
NOT sales
expressed
management
metrics Inand defined operations
as atopercent.
process. by yourteams, zone/BU, thelevel DC
like should
profitability create is acost to
or
R4.3.4
R4.1.4 -- DCDC has
compares "dream free, territory
flexible planning
and expressscenario" metrics with with a DC OTIF dream and cost/case.
NPS performance Within by past
and achieved
requirements achieved -Purpose:
with
-calendar/plan DC should
this We
process. use
show territory
(referencea matrix planning
with
global routing
template)
reduce
data to have
our
and cost/case
master
manager data inupdate
to
the
operator
DC.frequency order
levelteams shadow + balance
RACI and with service
work CORE.with Routing
another.
and cost, data
There
itshould
should
1 N/A N/A N/A N/A N/A N/A N/A
5.2 Implementation
Champions Routine
an
year,
customer &- DC
assigned
(sales the management
reason
operations)
DCclustercreatedand
code.
and
a
checks
and
update
"goal frontline
all master
territory teams
planning data understand
incustomer
scenario" their ERP. towhat
achieve NPS theis, DC's
the DC's cost/case NPS score,
reduction. 3 -- All R5.1.1, R5.1.2 and R5.1.3 are -serve.
important
include
DC should
Refer team
roadtoshould
to the gather
customer
create
speed
NPS
collaborate
aand dream results
communication
service planwith tototheir
time
create
improve.
by POC,
solid
router
question tomedium
The
at
create
inDC thesales
minimum.
and
scenarios
delivery long
and
Master
term
pillar
operations
data
actions
or redefine
regarding
should
toexecution
drive
delivery should
include
improvement
days,
the
of especially
the
create
POC's
different
a of the
"goal"
lat/long,
during NPS
types
orshould score
weeks
of
achievable
delivery
based
with
window,
less
plan,
R5.2.1
can
R4.4.3
R5.1.2speak -- Champions
DC
- Based about
sales ontheand
the
routine
impact
operations itcompliance
is defined
has on the
teams byhavewith
DC's the
the Zone/BU
asuccess
routine team
in clustering
in theorder
to creating
review plan
abusiness
customer oncycle
placement acentric
quarterly
and DC basis,
operation.
issues the at 5
in the requirements achieved -on
Purpose:
also
-delivery
communication If DC
customer
Ensure be hasevents
days
you
BEES,
Championsfeedback.
are to
available
our DC
bring
able
isshould
customers a
the
toto do
powerful
DC
customers
this
have
team
should
analysis
knowledge
routine
together.
than
receive to
atnormal.
least
helpof
during how
us
Redefined
2Thistimes thefree/flexible/MOQ/Fees
drive order
per
innovation
delivery
year,journey. the days
and best
clustering should are
the is
given
practice
be input
cascaded
to
sharing!POCs
intointo
DC
the and
the
this
involvement
customer
different ordering
systems
be
is in the
critical
like
as 1 N/A N/A N/A N/A N/A N/A N/A
5.3 DC 3YP minimum.
Management
NPS
weekly
R5.3.1 isand -improving
S&OP
DC hasteam
meeting can"goal
YOY.
created speak
following
a 3YP
cost/case
about
thethe
for their
Global
reduction"
involvement
facility, TOR. fleet
created,
Action
mix inand the
this
plans
DC has
routine.
aresuccess
people created
aligned
resources
this
to eliminate
plan
within thethe
with
issue
defined
achieved,
3
5 - R5.2.1, but R5.1.4
R5.2.2 andisR5.2.3
missingare agree,
segmentation,
SOP.
-many
platform DC ofroll
should our it out
(i.e. best
also
LastBEES).
andandideas
work
track
client
By tocome adherence
type
drive
including from
from
up the
the the
our to the
DC's
frontline
response
router
plan.
ERP. operators
rate
inavailable by
should
these conversations, and
educating
be reviewed
managers.customers
prioritization
in
on
S&OP
NPS
can and
routine
be done it's
to
purpose
andsure
show
to
aligned
if all the
give on
effort doing
feedback.
to make andto the
sales operations teams, torolled this plan out, and has created metrics
in the relatedbudget to 1 -- All requirements
R5.1.1 andR5.2.4
R5.1.2achieved
isare achieved, Purpose:
the
-territory DC ERP should and
planning show
Mile
routing. was delivery
theThis successful!
CORE
and warehouse
analysis
skills should
matrix be is changing inrapidly,
all points so it's where importantthe team as amakes
DC todecisions
make toour give ideas
service 1 N/A N/A N/A N/A N/A N/A N/A
R5.2.2
either through - DC has POC committed
management champions
or technology. projects and savings are included created 3 achieved, but missing --routing It
DC is should
important
process review to
muchknoworders some
smoother! based medium onteams, theirandwithmainlong primary
term actions
drivers
and
ofto
backup
refusals your make router
BU/zone listed.
support team's aretoworking on to helpproblems you it is in
5.4 CAPEX Plan and Usage in Zone/BU
cost/case
R5.4.1
block-- 1. DCbusiness
reduction
createdwith cycle
a CAPEX based
an appropriate on projections.
request log tracking
and has frequency.
prioritized CAPEX requests based on the but
5
1
- R5.3.1,
others
-- R5.2.1
All R5.3.2 and
are missing
requirements
and R5.2.2
R5.3.3
achieved
are
are
achieved,
feedback
customers
Purpose: is(outheard
Planning of by
stock
is our
all Zone/BU
management,
about using our routing
1DC
so resources
prioritization,
knowledge allocated
try andasand
sequence, anticipateworksense
time to
the create
windows,forfuture
the routines
operation.
etc)needs reduce
As DC
of the ordering
management,
operation. It is important 1 N/A N/A N/A N/A N/A N/A N/A
R5.3.2
R5.1.3 - DC DC
Monthly,managementat DC minimum, team gives
the DC sales feedback and as to what
operations resources
teams (people,
review fleet, facility, achieved, but R5.3.4 is missing --to
improve
a
important Utilize
DC should
proactive the
NPS.
to budget
have
way.
be If you a
Some
aware tool
know
critical created
these
and some
period
part are ofinactions,
asblock
daily
this plan
follows:
process to for
add track
these
asthe your
the to
week(s)
DC'sDC's
your plan
3YP champions
prior to
helps well
the us commitments
and
period push
understand to them
build up
where to deliver
volume
our actions
and
business place to
is help
extra
going improve!
attention
and what on
Tracking Zone/BU
R5.2.3 DCcan fabric,
show 3YP demands
project implementation with marketplace
butneeded may not needs,
show and
results budget in the
the territory
challenges
committed planning
tometrics. 3 0 -- R5.4.1,
but R5.1.1 and
others and
are R5.1.2
R5.4.2, andare
missing not are
R5.4.3 -- Create When
Ifuse
Show
ThisRoutingplan
creating
the
all Zone's a DC
is commitments.
a projects
should in DC: "dream
the fabric state"
DCimprove
hasto assess territory
committed the planning
DC's
to and status
thescenario, in accordance,
metrics this an
sentthat are analysis
buttoalso
expected of mapthe
tothem DC's
how
improve territory
your
toby
DC with desiredthe
will ensure
implementing frequency,
service
ischampions level and
warehouse,
implementation
productivity
R5.2.4 -ofDC
new
KPIs.
can
modals/fleet
progress
show improvement following mix evolution)
theof theGlobal are
TOR
committed for the in the
weekly
metrics based
next S&OP 3 years
on idle
to
meeting.
the fleet.
the Zone/BU
champions projects
team 1
achieved
achieved,
0 - R5.2.1
- R5.3.1 but
and
R5.3.2
R5.4.4 are
R5.2.2isare
achieved,
missing
not
-sales
resources
delivery
cost
- DC for
projects.
volume
should
are
metric
areas
the future.
show andofbe
needed POCs
KPIs
Other
the
reviewed
to
SOP that that
inputs
This
ofwould
the
monthly
have daily
of service a high
aachieve
routingCAPEX
inlevel
planner the refusalS&OP
arequest
solution
should
and
dream rate
for
meeting
reduce be(high
arecosts!
cost/case.
log
unexpected the
according
toThe
risk the
POC)
facility
S&OP
dream
routing
the
+ review team
is
maintenance
situations aTOR3-5weekly to with
year
and
ensure
checklistplan,show
salesproper
but
and
communication
progress
prior
the attention
thegoalto
DC's
plan.
of for
delivery
is the
3YP the
paid
plan
-(only
to
to this
current
these are
as part
R5.1.4 - DC the canbusiness
show cycle
improvement based on
of productivity
cost/case basedenhancements
on territory and
planning implementation. but others are missing plan
execution.
include
year so actions
refusal
tosolution
get Ifyour
thetypescan
team
DC be the
closer closed
notices
POC out
the
candream.
to communicate
this in
volume a timely
control planned
in this manner. is over
metric = do executed,
not include the DC logisticsshould schedule
reasons) a meeting to focus attention on
R5.4.2 - DC can speak about the routine and involvement to communicate requests to Zone/BU 1 - R5.4.1 and R5.4.2 are achieved, all Thegreat tools to
shouldhelp us and
consider these needs to our Zone/BU team.
implemented.
R5.3.3 achieved - Ensure
--volume
Track
DC
Create the
shouldand
ayour timing
rule gather
levers for to isshow
RMD,
the
routing DC when
OTIF
can
out ofcostsDC
and
pull
route ofnot
toCustomer people
implemented
and/or have outand
Complaints
a improve fleet.
champions
service
of stock People
levelperformance
orders. impactshould
projects the due andconsider
to track
lackwhether
tocreate the
solid
of DC's short
resources. driver
metricsand and/or
are
medium helper
improving. term pay
actions model and
todrop
team in-the DCstandard
management way and teamforcan speak to CAPEX
emergency their involvement funds requests. in the 3YP process with the 0
but - R5.3.1
others and R5.3.2 are not
are missing can Some include PIs of
the to
team
cost/case
daily
connected
salary that can
per
with
help
route,
the
focus
2nd
Zone/BUand to understand
are: capacity volume/stops/marketplace
utilization, km/route, POC projections
frequency, for
st/dttheratio, future at
Zone/BU
R5.4.3 team. the CAPEX Request Log, DC management has worked with vendors to get at least 0
- Within achieved - R5.4.1 and R5.4.2 are not -drive
the
-size, A SWOT
Create
DC. improvement
a way
stops/truck, analysis of
can
check
FTE/truck, thebe formetrics,
aduplicate
helpful
trips/truck hopefully
tool
orders in route leading
reflecting
forthe costsame
the and/or
toon NPS the day variable
improvement!
good, +/- abad compensation/case.
deliveryand ugly!
day +Use review thisprocessFleetsales/customer.
continuous
with shoulddocument consider to theadd fixedor cost
- Work
and
-move DCcost/KM with
should
items
your
or mile.
work
between
Zone/BU
on aDC SWOTplan team
should to
beunderstand
tocategories.
review able responseto show
The hope rates CAPEX
this. and speak
is through
submission to
increased sales and and prioritization
ifcustomers on how along with
giving RMD expected
surveys can
R5.3.4
one bid-for If DC needs torequests.
all CAPEX change fleet, people or facility profile, this is brought into the DC CAPEX achieved
--help
Use
By
timelines the
refereing DCwhen
of knowledge
to your this DC
processand budget
clustering,
withoccurs.
simulator
review datathe
Also, to anticipate
cost/case
understand when future
metric moneyand needs is reflection
review of people
granted, there and
+ the are focus,
headcount, thefleet
opportunities
expectation DC can
mix,
to utilizeto move
warehouse,
benchmark
CAPEX weaknesses etc
with
and spend
request- log,
R5.4.4 If CAPEXunion negotiations
is granted, project (3PL),isand/or delivered procurement
on time and negotiations
within budget. (rentals). DC can show toDC
resources
other
this
should
the
strengths
moneyDCs. DC toon
show
improve.
and
helpwhat
a matrix
mitigate
setwas up an threats! routing and master data
operation as we know resources and contracts are not easy to get in the short term.
granted.
update frequency RACI. Routing data should include road
speed and service time by POC, at minimum. Master data should include the POC's lat/long, delivery window, segmentation,
evidence. --- Understand
In the case"within
Clarifying of union the negotiations, this period (sometimes every time5level. years)
auditis a time to review content within the contracts and
and
What client
is thistype the
survey from thepast
emergency
asking?! DC's year"
CAPEX
ERP. = the 12
process months to prior at
follow to the the DC of
-propose
- Ensure
To show
DC
Primary should
new the
tracking
Drivers
topics.
showcost/case
ofisthe inBy
NPS:
preparing
placeimprovement,
skills
APP and
matrix
Featuresworkcontent
withwith primary
for
territory thethese,
& Rewards,
planning
management
and Customer
this goal
backup
can pillar add
statevalue
routerService,
can
-listed.
project to contract
be partially
Delivery,management negotiations
implemented.
Other Factors, block toin anticipation
This
deliver
Payment
is helpful
projects for if the
& Credit,granted
our teamon
Products,
changing
decided
time and&towithinbusiness
focusbudget. and ways to deliver.
a large TP effort and coordination with the commercial team on a key area that drives reduction of costs.
Pricing Promotions, Refrigeration Materials & Returnable, Sales & BDR Service.

Secondary Drivers of NPS Delivery and (indicators): On Time Delivery (OT), Driver Professionalism (RMD), Product
Condition/Quality (IF DQI), In Full Delivery (IF REF), Delivery Schedule (OT), Problem Solving (RMD), Product Availability (IF
OOS).

- When you dive into the secondary drivers above, you can see the relationship to operational KPIs and PIs - use these to
drive actions inside of your operation!
Questionnaire - Warehouse Pillar 73%
Reporting Period: Targets : 73% 68% Mandatory: 1
Facility Name: 68%

Question
Mandatory ID Question/Topic Requirement How to Check Scoring Guidance DC Comments & doubts Global Owner Feedback WH - DDC WH - ABI #REF! DEL - DDC DEL - ABI #REF! DDC
Weight
WAREHOUSE PILLAR N/A N/A N/A N/A N/A N/A N/A
FUNDAMENTALS N/A N/A N/A N/A N/A N/A N/A
1.0 LAYOUT & CAPACITY N/A N/A N/A N/A N/A N/A N/A
Yes 1.1 Layout Optimization R1.1.1 - Layout plan is executed with clear allocation for 1. Check if DC has a layout plan executed with a clear allocation of certain 5 - All requirements met​. • The layout design should be divided into zones accordingly with different activities such as empties zone, refusals zone, picking 3 N/A N/A N/A N/A N/A N/A N/A
all products, assets and different activities inventories and activities. Check of the location of the products in the warehouse 3 - R1.1.1 and R1.1.2 are met, but one of the zone, qualification zone, repack zone, finished goods zone, keg box/cold chamber, pick & pack zone, and high-value products
1.2 Capacity Management R1.2.1 - Process defined to quantify the storage and 1. Check if there is a process in place to quantify the storage and calculate the 5 - All requirements met​. • To optimize the warehouse capacity, the focus must be on minimizing the cost and man-hours, while maximizing the asset and 4 N/A N/A N/A N/A N/A N/A N/A
R1.1.2 - Layout plan is compliant with safety and quality corresponds to the latest ABC analysis other requirements are missing. storage zone.
calculate the Capacity Utilization (%) Capacity Utilization (%) 3 - R1.2.1 is met, but missing one of the others​. capacity utilization, considering inventory policy, and the desired service level.
2.0 QUALITY standards 2. Check if the layout allows the products to be stored according to safety and 1 - R1.1.1 and R1.1.2 are met, but two of the • The products need to be stored according to the quality standards such as finished goods stored on pallets (never directly on the N/A N/A N/A N/A N/A N/A N/A
R1.2.2 - %Cubic meter utilization is monitored in all 2. Check if DC is using the vertical space available by monitoring the % cubic 1 - R1.2.1 is met, but missing two of the others​. • The implementation should also consider allocating maximum square meters space to storage and inventory processing
Yes 2.1 Quality Fundamentals R1.1.3 -- Employees
R2.1.1 ABC analysis istrained
performed on quarterly basis quality standards other requirements are
met​missing. floor) and at aQuality minimum distance ofbe 50checked
cm (18 inches) from andwalls and other pallets
can beto minimize moistureGOP damage andifpest 3 N/A N/A N/A N/A N/A N/A N/A
warehouse areas forare vertical space in quality
optimization standards 1. Check
meters if the facility
utilization in allhas quality training
warehouse areas for all employees. Check employees’ 5
0 - All requirements
Requirement R1.2.1 .is not met, or three or •purposes Warehouse while minimizing GOPs should
space for office areas, monthly,
empty pallets, an action
charging plan stations, defined
crosswalks, to improve
vehicle traffic,Scoring etc. the scoring
for stock and picking
annually 3. Check if the
awareness andABC analysisofhas been performed on quarterly basis for stock and 3 0 -- R2.1.1
R1.1.1 is and /or but
R1.1.2
two are notother
met, or three is harborage.
2.2 Quality Policies R1.2.3 -- Non-conforming
R2.2.1 %Square meter utilization product is monitored
blocking, Returned in all 3. Check
1. Check ifif the DC isknowledge
well usinghas
warehouse the quality
policies
standards
area available in place by to monitoring
ensure that %Square
non-conformingmeter more
5 - Allof met,
the other
requirements requirements
met​
of the are missing. • Warehouse lower than 90%. Capacity Utilization should be monitored the daily or above:
weekly and its information available to drive decisions in everyday 3 N/A N/A N/A N/A N/A N/A N/A
R1.1.4 - Warehouse
R2.1.2 Employees involved in the layout plan and ABC Check pickingif the warehouse adheres to global quality standards - considering the 5 or more of theare other requirements are missing. •• Non-conforming
. Areas should teambeshould
products
identified blockage
withstandards
signage should and/or follow striping. criteria
warehouse
and Destroying areas for and
Policies area surrounding
arespacedefined
areas
optimization
and updated as
without utilization
products are in all warehouse
blocked and areas andwhenever
repacked optimizing the layout
possible to considering
avoid losses. maximum
requirements missing.
3 - R2.2.1 and R2.2.2 are met, but one of the operation.
1.
BU/Zone
Non-conforming product
provide
is physically
and training
blocked with some
to employees on how to handle marketplace SKUs and guarantee product
barrier flooror pallet blocker to prevent forklift access
2.3 Stock Age Management Analysis
R2.3.1 - 100% are trained
compliance withmeters FEFO is ensured by daily1.4. Check
warehouse
Check employees’
if daily operationwarehouse awareness operation of the layout
can eliminate plan and ABC
operational Analysis
errors and ••quality. All products should be easily identified by an overhead marking, marking, or any other way that allowsto move
the the pallet
warehouse team 4 N/A N/A N/A N/A N/A N/A N/A
excessive
(considering
provided
accumulation
maximum
by BU/Zone team
of trash,
square old pallets space orforunused
storage critical
square
2. Check
points:
meters
if there space for storage and inventory whilereturned
minimizing fromspace for ensure 100%
5
1 - All compliance
requirements
R2.1.1 is met, with
butmet​
FEFO.
. of the other
three Each
The vertical zone orspace site shouldavailable have can a be policy to define
optimized
marked by
how FEFO
withinvestigating
prioritization
thepallets ismedia
storageindicating guaranteed.and thetaking
Rotational
natureadvantage
Product of thePolicy
clearand span height.
R1.1.5 -- All
R2.3.2
equipment, ABC and standard
pallets other easily adherence
are
conditions identified
that (%)might is
with monitored
a standard
provide 5.expiration
ID,
2. Check
Warehouse if DC
all
date, is is
pallets
and
a policy
measuring
blockingare
surrounding
toABC
easily
date,
ensure standard
identified
pre-blocking
areas
that products
for withadherence
overall dates,
a standardand
cleanliness,(%) anyID, other
customers
expiration
excessiveinformation
date,
are other requirements are missing.
blocking
necessary
3 date,
- R2.3.1
to
requirementsensure
pre-blocking
is met,
FEFO
are butdates,
standards
one
missing. of
and
the any
other
other
requirements
information
Pallets
to recognize
Identification are
of non-conforming
necessary
missing. which
Pallets
to product
ensure
Policy
products
is palletized.
FEFO
should
are
standards.
comply with FEFO
signs over the
practice and meet the following criteria:
of the non-conformance, blocking
2.4 Suppliers Development and inventory
R2.4.1 - Actions All processing
occurrences ofpurposes
products while
with minimizing
inadequate crosswalks,
1. Check analyzed, vehicle and
if products traffic,
withprocessed etc)
inadequate packaging, palletizing issues,
issue. or intrinsic 5
1 - All requirements met​ . met, but two of the For that,
andDC theshould measure how many cubic meters/feet offor vertical space is beingand used.
R2.2.2
R1.1.6
R2.3.3
harborage -- All
Quality
toemployees
policies
are defined
rodents,
for
involved
birds,
marketplace
to insects
or solve
in FEFO problemsSKUs
procedures
within the
are
and blocked,
6. Check
are trained
facility. 3. Check
accumulation of
in employees’action
standards plans
ofinformation
trash, oldtomaterial
awareness solve of
pallets
according
problems
the
ordesign
unused standard and to improve
the
equipment,
detected
procedures results
and tometers
otherreduce FEFO that
conditions breakage
R2.2.1
1 - R2.3.1
and R2.2.2
and near-expired
is met,
are
butproducts.
two of the otherof requirements ••date,
1.
Damaged/broken
Inventories
Identification
are loading
missing.
person
should
Pallets
products
beresponsible
in such
must
are
containasegregated
for
way final
anthat expiration
and
disposition
fastest-moving accounted
date, blocking and daily during
highest-volume
dates, and
picking
SKUs have
pre-blocking
otherthe warehouse
dates shortest
according travelanddistance
delivery operations.
to the globalthroughoutquality
3 N/A N/A N/A N/A N/A N/A N/A
space
packaging
followed for
improve- ABC as crosswalks,
orprovided
palletizing
standard byvehicle
issues
BU/Zone
adherence
traffic,
areteam. (%)
etc.)
kept in a database, 4.
3. Check ifif the
weaknesses a in packaging
Destroying of about
Products warehouse
Policyare isdensity
recorded
defined (%
and cubic
and subsequently
aligned reported 0
with utilization) 1 - R2.1.1
other R2.4.1 is not
met,met,
requirements but
are
or four
missing
missing.
orone
moreof thetheothers​. ••2. the
Dock
Data records for
Non-conforming
warehouse
and
–are
using
product
from products racksareor
breakage/damage
receiving
flow
blocked
to storage
racks arethe
to should
within picking
initiatives
be
system, that
analyzed
to checking, andmaximize and
final total
stratified
anddispositions
finally, loading
utilization
to are
identify and
on athe
accurately warehouse
toprecorded
delivery 10vehicle.
SKUs. density.
in an internal database
3.0 INVENTORY MANAGEMENT R2.3.4
R2.1.3
R1.2.4 Stock
A
The pest Age
management
capacity Index is monitored
utilization, system andand isroutinely
implemented
density (% cubicto to 4.
might
and Check provideif Stock
utilization Age
harborage
are being Index isto
to rodents,
used monitored birds,routinely.or insects within the facility. 0 - R2.3.1
other is not met,
requirements areormissing.
three or more of the other policy requirements missing. N/A N/A N/A N/A N/A N/A N/A
the causes
R2.2.3 - All are analyzed,
non-conforming stratified,
products aresubsequently
blocked the suppliers
environmental requirements.​ ​ improve results and to handle forecast changes for 0 - Requirement R2.2.1 and/orR2.4.1 R2.2.2isare notnotmet, or or
met, 2 of the •3.
three • The DC should
database
Non-saleable
After ranking
defineshould standard
products
products be procedures
analyzed
intended
from in by
for
highest toa lowest
when capacity
suppliers,
destruction SKUs
volume,are notutilization
and at
select carriers.
the DC is more
near 100% than 30suchdays asafter
isolating crosswalks
generation and and/or
do not vehicle the
exceed traffic,
R2.3.5
meters --birds,
control Stockrodents, Ageinformation
Index and is analyzed andand actions are taken 5. Check
topest
solveifmanagement
FEFO
Stock Age
breakageIndex problems
is analyzed and and improve
if maintain
actions results are taken
SOP to solverodents,
problems and improve results. •2. ifdefining
DC does not have WMS otherplace, standard ID(WMSPallet andbreakpoints
100% of thetoPallet separate “A” (fast-moving,
in storage must have high volume), ID
this standard “B”Pallet
(medium-
Yes 3.1 Inventory Counting Process reported
R3.1.1
(physically utilization)
Cycle the count
to and zone/BU
in the system) process or insects,
are
andused
suppliers SOP
monitored
action
to define
defined are
with action
outlining
no
3.
both
1.
2.
4.
A
Checkhigh ifand there
the low are capacity
communication
quality
system
apolicies
cycle count must
with
for
exist
process
the
marketplace
and
suppliers defined
SKUs and
is done arean
tomonthly
control
implemented
birds,
defined
by theand and
DC or
followed 5 -more
others
or All requirements
are the other met​
of missing. .
requirements are missing. zone orDC
velocity), should a buffer
andexecute
shipping parameters
“C”
ortheany
(slow-moving, process initiatives
lowwith the
volume)
to reduce
Tech tool
groups.
the impactcounting in productivity.
module or similar). 3 N/A N/A N/A N/A N/A N/A N/A
& Results defined
to
howhandle
to -take to solve
forecast
inventory existing
changes of all problems.
forthe
items both high and
(assets, finishedlow and
5. insects.
Check
executed Review
ifoutlining
warehouse orhow action logs for
adaptations
to properly actions
and
take againstwith
investments
inventory, existing
to counting problems.
accommodate frequencynew adherent 3 - R3.1.1, R3.1.2 and R3.1.3 are met, but two ••3.The DC WMS shouldshould
training trainensure
employees thatmandatory
allininformation
thethe standard to procedures
identify eachtopallet manage is available
warehouse in asignature
digital way
capacity when (ID,capacity
expiration date,knowledge).
utilization blocking
is near dates,
100%.
3.2 Product Traceability R2.4.2
deviation
R3.2.1
R2.1.4 -and
Communication
in blocking
Traceability
Non-food grade
failure
Process with KPI
chemicalsis inmarketplace
place
such toashelp productsa 1.
oils,locate
fuels,to to
through
as provided
4. Check
Non-food
zone/BU
if and aby external
traceability
grade
marketplace
chemicals
suppliers/BU
process such
team.
is in and
as place
oils,
Zone team.
torequirements
fuels, help andlocateothers aoutlined
product
are stored inWarehouse
the
awayand and 5 - All requirements met​. •• A
and
Repack
Starting
documented,with should
Policy
pre-blocking the “A”have
should
systematic
dates)
meetplan
products, following
assign validation
storage
that indicates criteria: (Inclusion
locations
how an organization
of
closest minutes
to the or digital
willdocks
track or and in recall
line with informing
the flow
produce
the
needs
process
of product
to be inthroughplace, athe facility.
system 3 N/A N/A N/A N/A N/A N/A N/A
capacity
goods,
suppliers istheothers)
done withblocked,
monthly counting
byany frequency
the analyzed,
DC or adherent processes
Zone policy to support
and proper growth
segregation come theon from roles and responsibilities in
(RACI), of the other requirements are missing. •1. Inventory documentation shouldthe include an explanation and then the outcome ofmoving
any someinvestigation into accuracy deviations above
R2.2.4
product - All
-- in
returns
warehouse are at time bythrough and
batch zone/BU 3.
5. Check
warehouse ifemployees’
actions
at any are
time taken
awareness to
by batch_x000B_2. improve
of overall
quality Check quality
if thepackaging
policies. movements of theinproducts 3 - R3.2.1 is met, but missing one of the others.​ •should Focus DC
The most product
enable
should
is 100%
efforts
tracing
manage to andbackconforming
streamline one stepthe
eliminate
but
and not
product saleable
trace
impact handling
forward
in FEFO
due travel
one to
of the
handling
time
stepkeyto for damage
these
occur
accounts
of either
infastest
the
thatevent
onlytrucks
of the primary
of a products.
receive recall. Fillwith packages
remaining areas(removal
that and
are
3.3 Asset Management and
R1.2.5
R3.3.1
Zone
or others
policy
marketplace
processed SOP are
Warehouse
and isstored
according defined
proper
team away
Toolkit
to the
and
Design
anddetected
updated,
segregation
the
separaterequirements
onissueroles from
outlining ​asand
finished
theare by separate
defined Toolkit
1.Check
considering
6. Check iffrom
Designifan aall
finished
SOPproducts
Repack
goods
is defined
Policy thatisDC to avoid
and executed
in manages
place
cross-contamination
andsuch outlining
adherent theDPOQ
as finished and
receiving
goods, off-odors
of assets finished
assets, from 5
1 - All requirements
R3.1.1, R3.1.2 and met​ .
R3.1.3 are met, but •a DC
certain should have
threshold. athe clear process for reassembling the asset pallets after unloading to products
send (racks,
back dates
toetc.)
the far
brewery from expiration
according 3 N/A N/A N/A N/A N/A N/A N/A
R3.2.2
goods
used to
for - Movements avoid
all warehouse of
cross-contamination productsand
adaptations are
and collected
off-odors
investments and are
in to Route
goods. collected and stored in a historical database, withtoidentification A4-105. and registration 1 - R3.2.1 is met. •replacement)
further The
Problems from the
traceability
with
or docks
ofand
obsolete
secondary
for
recall the procedures
products
package
“B” product. that should
are
(replacement
Reserve be indistant
notarelated the to
and
planareas recoding).
as well
operational or zones
as thewith
errors limited
recall
such asteam accessibility
FEFO roles with contact
should be addressed for
information, “C”
intothe products.
and contacts
planning
receiving
responsibilities
R2.4.3
the returned - of
Action assets
policy(RACI)
Plan fromis Route
defined Return
to improve or external
overall quality marketplace
7. Check
Check Return or external
products, raw suppliers
materials identifying
if applied, receipts
POP or if needed
marketing products, etc. 3 -
three R3.3.1
of and
the R3.3.2
other are
requirementsmet, but
are two of
missing.the to
• If safety
a standards
deviation is unresolved, there should be record of the problem-solving tool (Abnormality Report, etc.) used check the
Yes 3.4 Loss Prevention & R3.4.1
stored
finished in - goods. Losses
a historical areprocesses
explained
database,and using reason
withtoidentification codes and 1.
of
5. all
Keg the
Box ifif the
movementsDC site is monitoring
temperature can and show Blocking
ishandling and explain
recorded that Failure
daily losses
theand KPIusing
product with
anemployees
SOP went no
reason
or
occurrencecodes
through_x000B_3.
OPL ispossible
of deviation.
associated
outlining Check 5 0 - All requirements
R3.2.1 is not met,met​or .two of the others are 2.
• DC
•for
pillar TheThe product
ABC
should
product
(e.g: Analysis
have does
destinations.
non-alignment
not be
can
dashboards exceeddone with
Additionally,
with
the
sales)not established
only
Control
the plan considering
& Loss age
should limits,
the volume
prevention
have according but to
indicators.
ready-to-use also DPO the Product
documents number Age
such asstandards.
of orders. traceback/recall customer contact 4 N/A N/A N/A N/A N/A N/A N/A
accommodate
suppliers
R3.1.2
packaging
R2.2.5 - identifying
Inventory
Destroying new of receipts
of all items
products if(assets,
needed
is support
executed finished growth
alignedgoods, 2. Check ifunderstanding
returnable assetsamongst are sent all to the
warehouse brewery whenever about the tothe
inventoryavoid other
0 - requirements
R3.1.1 and/or are missing.
R3.1.2 and/or R3.1.3 are not •possible
3.
• The
It Theis sorting
sources
repack
important process
to of
operation the
update is deviation.
the
does
thissegregation
not
analysis in any and between
way introduce
layout good
frequently aassets
new to and
quality
accountassets
deficiency
for broken
trends to or
the
and with
final any otherinproblem
product
fluctuations (e.g.
volume erasure that
mix, stop
of
as theirasusage.
primary
well
Recordkeeping associated
registration
R2.1.5 with
ofBox allthethe causes
movements of loss and (e.g: breakage
handling that inthe with the causes
ifprocedure
traceability of loss (e.g:
information breakage
is provided when inout-of-spec
picking,
a recallinventory
isconditions
needed differences, 3 - R3.4.1 is met, but missing one of the others​. forms
missing. The Obsolescence (stating who was global GOPthe
called, performance
date and time, should andbethe analyzed
purposeif of losses
the recall).KPIs do Thesenot improve
forms will from
be LY.used to trace the origin of a
MANAGE TO SUSTAIN R3.3.2
and others)
standards -- Returnable
Keg is executed temperature
assets areissent
in compiance recorded
towiththe daily
brewery
minimum and an idle assets,
the obsolescence,
counting process for monitoring
adherence to and correcting
breweries/soft drink plant plan as defined by zone 1
measured_x000B_3. - R3.3.1
met, and
or fouris of R3.3.2
the otherare met, but three
requirements of the •package
areothers​ innovations. The
DCsshould Scraps
canlotkeep arean
code, all assets
inventory
mold, that
action
off-aroma, need log toto
glass be throwncycle
record
particles, away
crown because
count rust, they are
execution,
etc). broken execution,
full-count or with anyand otherany problem
investigationsthat stop their usage.
required for N/A N/A N/A N/A N/A N/A N/A
picking,
product
SOP orInventory inventory
went
OPL through
is outliningdifferences, the idle obsolescence,
procedure for theft,
monitoring quality theft, FEFO breakage, and others) 1 - R3.4.1 met, but missing two of the . •
product DC and measure
account FGLI
for all KPI
other andproductsDC track SCL
distributed financial
from impact
that same to understand
point of origin how that the operational
falls under the KPI
recall impacts
scenario.financial results
whenever
Global possible to avoid
Control isPoilicy. assets, adherence to A4- Check
3. Check ifstandards.
sorting results are monitored (%scrapped and if%sorted) at the individual other requirements are missing. Should havewith a clear definition at thewhat ofpoints the site will perform the checks.
4.0 PICKING R2.2.6
FEFO
R3.2.3
and -- Traceability
breakage,
correcting
Repack policy
andinformation
out-of-spec others) executed
conditions
aligned
is provided as defined
towhenDPOQ
bya zone 2. 6. Check
Product ifif is Inventory
all products
not exposed
Toolkit
losses Adherence
toCheck are reported
excess
is tracked and
in themoisture,
WQI, the information
FGLI, and SCL KPIs is used to 0 missing.
- R3.4.1 is not met, or three of the others are ••sizeable The
Operations
DC
A should
mock
inventory
Returns
recall Policy
validate
should
variations.
should
increasing
the beMCRS have
numbers
done. and
A mock following
review SKUs
recall process.
iscriteria
or anissues to in
internal avoid
ABC the
exercise riskto of
adherence test sabotaged
should
a company's run products:
theability
ABC to analysis
trace and in monthly
recall a basis.
product using N/A N/A N/A N/A N/A N/A N/A
breweries/soft
R3.1.3- Inventory drink plant implemented
Toolkit plan measured (employee level)_x000B_4. if dust,
targets mold,and performance or sunlight.
of the sorting process 0 - R3.3.1 and/or 3.3.2 are not met, or four or •1.An DC should kegs have RACI forwith
route return process theand empties shipping to performed.
breweries.
4.1  Picking process
105​
R3.4.2
recall
quality
R4.1.1 --and
isstandards. All products
needed
Picking SOPlosses isanalyzed
defined reported and inand
updatedthe adherence
WQI, FGLI,is 1. define
3.
7. Check
Check
actions
ififif there
WQI, and
marketplace FGLI,bringand results
SKUs SCL KPIs
quality are monitored
standards arefrom and
implemented analyzed and is followed as 5 missing. ••its The analysis
Returnedlosses
documented
of the
KPIs must SKUs
should
traceability be inspected
be broken
and
major
recall
impact
to
into verify
plan. IVs:
beWhen
(HL and
integrityfinance)
performing of the should
a “mock
be
tamper-evident
recall” onecaps needs to create a scenario of a problem with a
R3.3.3
tracked Sorting outcomes results are monitored to improve (%scrapped results​and are 4. Checkavailable allis employees
thetofinished a Picking
good SOP
andand in
asset place_x000B_2.
if they understand
differences Check
their theimpactif there
last on
inventory a digital
are tool - Allof
more requirements met​
the other requirements are missing. 2. Once
DC
Major
Primary avariances
should year the
ortrack
secondary picking
the
and System strategy
deviations
packaging utilizationshould
should and
be reviewed.
adherence
escalated inproper
anytovisible the evidence
route
areas return
(finance, process control,and asset
planning, loading
etc).for breweries (TMS or similar) 3 N/A N/A N/A N/A N/A N/A N/A
and
R2.1.6
R4.1.2SCL KPIs
-- Picking
Product isgoods
orders not exposedexecuted towithexcess digital dust,tools, mold, 4. Check
provided
for preparing if actions
by BU/Zone
and executingareteam.defined to improve
picking orders, operational
that gives results
the optimal linked with losses to on 3 - R4.1.1 is met, but missing one of the others. •delivered 1.The Total breakdown
product. Anofcost
operation thenmust follows not show
thebetraceability and recall plan, of tampering
tracking damage
date and time of contact. The mock recall
%sorted)
R3.1.4
R4.2.1 - Finished at theand individual (employee)
and asset level
differences are picking results_x000B_5.
correctly reflected Check
incaused
the systemif an SOP and is defined
ifbreakage)
the site and
can ofexecuted
clearly showfor areaallsequence
disposing
actions oftaken
scrap •2.DC
3. Productsperformance
should measure
recovered preparing
the picking
asset orders
idleness should
tostoring
ensure reflected
that returnable on systems
beassets and/oraredaily printed
sent to the documents.
brewery whenever possible
4.2  Picking Area R3.4.3
moisture,
ensuring
SOP,
WQI,
orand
the FGLI,
sunlight
optimal
RACIand
sequence
for
SCLreplenishment
KPIsto in are analyzed
assemble
of the
and(SAP
1. Check
(e.g: obsolescence if an SOP and RACI by FEFO for replenishment the picking are defined and 5 - All requirements met​. should WhereTotal there
Damage
have as isclose
ainnightly tofrom
picking 100% consumers
/ should
Total process,
Movement
reconciliation for
give an of
quality reasons
between
inallpicking,
implicated must
1.3x and
products properly
2xasthe segregated
possible. supply and
of blocked
product for destruction
in the pick and must
area should mitigate 3 N/A N/A N/A N/A N/A N/A N/A
Replenishment R3.3.4
reconciled
area
R3.4.4 defined - Targets
- Actions and and
correctly
safety
are
performance
defined reflected
concernsto improve
ofthethesystem
addressed sorting
operational to process
reduce / ifassemble
according
accuracy
5. safety
Check concerns
if
and
results
covers
to environmental
deviations are
are
all SKUs
after
addressed
improving
bycount.
to
improving
therequirements_x000B_6.
last againstreduce Check
LY
productivity
interaction
/ Budget
Check
if physical and
between if picking
stock actions
matches
forkliftsareand defined
SAP / to 1 1 - R4.1.1 is met, but missing two of the others. •never
- R4.2.3 is missing​ . the
The
3. need
system
be repacked
Breakage for
used
forklifts
by
in
for
forkliftin
picking
sale
the pick
operator, area during
assembly
the picking
sequence
process.
for picking focused on productivity and safety.
4.3 Picking Accuracy R2.1.7
R4.3.1
covering
are
ERP)​available
, with - SOP Marketplace
allroot
SKUs is cause
to defined
all and SKUs
employees unit
and and quality
updated
picking
action and log standards
by
they outlining
inimproving
understand
place are
totheclose 1. Check
accuracy_x000B_3.
their pedestrians
solve
ERP if thereand
problems
inventory is an SOP employees'
Check
improve defined
the planand being executed
awareness
adherence (%)of thetostandard verify load picking and 5 0 - All requirements
Requirement met​.is not met, or three of • Consider
R4.1.1 There the following
should notmust havehave solutions
loosea and/or (among others)
non-palletized to ensure
products that
that cargo
make isin-trade
accurately
pallet assembly constructed
unproductive.and loaded for delivery: 4 N/A N/A N/A N/A N/A N/A N/A
interaction
results
implementedlinked betweenwith
and forklifts
losses
followed and
asand pedestrians.
reflected
provided in
byfinancials
BU/Zone 0 - Requirement R4.2.1 and/or R4.2.2 not met. •4. Return
4.Sites
Break with product
by ahelper
24-hour continuous defined
picking sector
process within shouldthe warehouse
make efforts forto replenish losses the picking area during break times and shift
verification
productivity
impact on
gaps. of
and
results thepicking
load picking
accuracy and unit picking loads unit picking
procedures_x000B_4.
5. Check loads before
if accuracy Checkleaving
deviations if theforcrates
are marketin the unit picking process or kitting
analyzed 3
the- R4.3.1 and R4.3.2 are
other requirements aremet, but missing one •1.
missing. Scales
BU/Zone verifying the weight of outgoing pallets to matchSKUs anticipated/calculated order weight
5.0 LOADING / UNLOADING DELIVERY
R4.2.2
results
team
before
R4.1.3 (e.g:
leaving-
VEHICLE
- Employees
All obsolescence
for
employees market
involved
involved
in picking
caused in by FEFO
picking
area breakage) 2.
are trained in 2.
Check
ensureCheck
for
quality if
employees’
all employees
and package
understanding
are aware
appearance of
of the standard procedures
the standard
according to procedures
zone/BU quality of the others​ ._x000B_1 - R4.3.1 and R4.3.2 are
changes.
• DC
2. Supportshouldshould
forhave
cameras,aprovide quality
Gatetrackers,
Control, policies
including
scanners,
to marketplace
checks
or other for
typessafety, of
before quality,
product
technologies
the arrival andofproductthese products
quantity as at the warehouse by the Asset
recommended N/A N/A N/A N/A N/A N/A N/A
R3.3.5
R3.1.5 - SOP
replenishment Accuracy is defined deviations and updated
for standard
all items for disposing
are analyzed of 6. Check
Check ifif a actions is inare taken to solve problems and improve results
5.1 Loading & Unloading R5.1.1
R4.3.2
the
scrapstandard
R3.1.6 according-- SOPAll isare
employees
Financialsprocedures
to
trained
defined and
are
environmental
results
in the
and updated
trained
are tools in theoutlining
requirements
improving
procedures.
standard
by actionthe plan 1. 3.
3. Check
policy_x000B_5.
7. Check the
ifif Picking
PI
existence
results Check
place
Accuracy
are ofif DC
improving
to track
an SOP
PIhas
occurrences
ainstandard
isagainst place
monitored LY
of picking
outlining
daily the
inprocess routine
area
loading
implemented
replenishment
andand unloading
being 5 - Allbut
met, requirements
missing twomet​ . others​.
of the
•and
•3. DCLoss
TheRandom
should
warehouse consider
Prevention
recount should Digital
ofteam,
theuse
capabilities
Zone
a tool
entire Safety,
load to for to
prioritize support
aorsubgroup
the and Securitypicking
order
of trucks thelayout
group. loads optimization
after theyfor building
are loaded and and loadingready if DC has a limited dock size or drive-
to go. 3 N/A N/A N/A N/A N/A N/A N/A
Process R4.2.3 -and
loading PI isunloading
defined toprocess track occurrences of performed during the picking process • DC DC should should track losses thatamount
are related with operational errorsthat such asbe breakage, and FEFO non-compliances.
5.2 procedures
R4.1.4
R3.3.6
taken
Outbound Load Scheduling R5.2.1 in-- inventory Crates
Disposing
Outbound available
of
process
loads scrap the for
to according
planned unit allpicking
with
modals
to process
standard
tools to optimize or 1.process
4. Checkfor
executed
Check the
all
iftorefusals modals_x000B_2.
separately
existence withdispose
ofload a tool errorof Check
used reasons
the waste
for
if theare
planning
Loading
tracked
generated and
in the
the outbound
unloading
picking process for
loads.for recycling 5
3 - Requirement
0 R5.1.1 and R5.1.2
- All requirements R4.3.1 are met, but missing one •through
met​.and/or 4.3.2 are not • The
area,avoid
warehouse
restrictingredundant
should
the
use achecking
of of
tool to prioritize
WIP the(workpicking in progress)
and order orders, the the loads
can
verification
for building
handled
should at once.
and happenloading ifone DCtimehas anda limitedbe sufficient
dock size to or
ensure
drive- 3 N/A N/A N/A N/A N/A N/A N/A
replenishments
R5.1.2 --AllLoading ofand the picking
unloading area processperformed for unitallduring
modals the different
R4.3.3
kitting
R3.1.7-to
R3.3.7
docks utilization Verification
ensure
Actions
employees are of
quality the
defined andload
involved package picking
to solve
in and
appearance
theproblems
inventory pickingis 2.
and
counting 5. Checkmodals
purposes
Check ifif theactions is executed
timeare slots taken according
to
for loading improve to standards
are PickingsufficientAccuracy
and safety and productivity
to satisfy the volume required for 3
of
met,theorothers​
- R5.2.1 three . of the other requirements are
is met, but missing one of the others​. through
•accuracyThis tool should consider the routes departure time and the maximum capacity of the loading areas to organize the loading
area, restricting the amount of WIP (work in progress) that can be handled at once.
5.3 Load & Unload Efficiency picking
R5.3.1 -process.
%according
executed
loads before
according
improve
process
R5.2.2 the
- are
Timetooftrained
trucks to
leaving
zone/BU
returnable
slots for
loaded
for standards
market
quality
assets
loading
before
policyisand
plan
defined
departing
executed safetyaccording
adherence
and sufficient
time
and (%)is toto the 1.
6. Check
requirements
DC
if % theofsupervisor
trucks loaded before departing
has access for pickerstime is measured
individual performance 5
1 - All
missing.
1
requirements
R5.1.1 and R5.1.2 met​ . met, but missing two •process.
are
- R5.2.1 is met, but missing two of the others​. • This
With
Places a WMSunion
toolwith
system,
should consider
measuring
restrictions the routes
this unit
to share can become
indiviual
departure performance
time
easily accessible.
and the maximum must havecapacity the information
of the loading and use it only
areas for supervisor
to organize action plan
the loading
4 N/A N/A N/A N/A N/A N/A N/A
monitored
productivity
standard requirements 2.
3.
7. Check ifemployees' % of trucks unloaded in
awareness of the expected
standard time is measured
procedures_x000B_4. are ifin 3
Check of-theR5.3.1 is .met, but one of the other
others​ • DC There should
should monitor the KPI: Unloading
be monitoring of % of trucks timethat and/orhave#of beentrucks loadedunloaded.
before the departing time or HL/#PA Loaded by the hour.
6.0 REPLENISHMENT R4.1.5
satisfy the - Processvolumetorequired disposefor of the the DC waste generated in 3. Check if picking an SLA accuracy is in placeresults with the and refusals
delivery team caused to reduceby picking issues error
or delays 0 - R5.2.1 is not met. process. N/A N/A N/A N/A N/A N/A N/A
R5.3.2
R5.1.3
R4.3.4
the picking -% All of
Picking
for trucks
employees Accuracy
recycling unloadedinvolved
PI
purposes is inmonitored
the
in expected
loading
implemented time
& unloading
in and is 3. Check
overall
improving ordersifagainst
loading
loaded truck
LY are
/ histogram
budget verified before is analyzed leavingand actions defined to improve
for market requirements
0 - Requirement areR5.1.1
missing. and/or 5.1.2 are not • DCs should have technology in place to measure % Docks Utilization.
6.1 Receiving Process R5.2.3 -- SOP
R6.1.1 SLA defined defined with
and the
updateddelivery team to
outlining thereduceprocess 1. theCheck
loading for process
the existence •• Blindly
Or a WMS tool can be usedare to provide a loading plan intoininventory
order to optimize this taskwhich and delivery departure
to expect in the morning. 3 N/A N/A N/A N/A N/A N/A N/A
monitored
process
individual/employee
executed. are trained in
levelthe standard procedures 4.
5. if unloading
refusals truck of
caused byanloading
histogram SOP is inerror
place
analyzed areoutlining
and actions
improving the process defined to to
receive
improve a 5
1 - All
met. requirements
R5.3.1 is met, butmet​ . of the other
two DC should receiving:
define operators
an SLA with thereceiving
deliveryproducts team if there are issues without
or delays knowing in the loading product
process.
issues
to receiveor delays a load in
from the loading
all modals process
into inventory load into inventory if employees are communicated knowledgeable about the standard 3 - R6.1.1 andare R6.1.2 are met, but one of the The receiving
6.2 Inbound Load Scheduling R5.3.3
R5.1.4
R4.3.5
R6.2.1 -- Time
Loading
The
Refusals overall
slots truck
with orders
analysishistogram
load loaded
error
is executed analyzed
is verified
reasons are and
according beforeactions
tracked to 5.
1. Check
Check ifif thetargets timeand slots performance
analysis is executed accordingtotoemployees the receiving capacity requirements
5 - All requirements missing.
met​. •• The A time windowSOP
framework planning should
for managing
refer to
system theorloads
and
digital relate
fromtools to thebe
thecan brewery
Freshness
in place and
shouldtoprovidehelp Rotation
optimize Policy allocation
flexiblethe
and Gate Control.
time windowsofand docks.
availability for carriers (3rd 3 N/A N/A N/A N/A N/A N/A N/A
R6.1.2
are defined -for
Receiving
to improve process tofrom all modals into procedures._x000B_2.
6. Check if loading andstock Check
unloading if receiving is done blindly, with operators receiving others are is
missing. • Replenishment strategy should be improved using initiatives
in ordertotohelp optimize thistime
task and and travel distance as well as morning.
FEFO
leaving
R4.3.6
receiving the
Actions
capacity market
are and to
taken ensure
sufficient improve accurate
to cover Picking orders
stock and
Accuracy
policy and sufficient to cover policyefficiency results are analyzed 0 -- R6.2.1
3 R5.3.1 not met,
is met, or three
but one of theor others
more ofis the party,Or a dedicated,
WMS tool can be used
or company-owned) to provide to a loading
deliver plan
products. optimize delivery departure in the
6.3 Truck Cycle Time R6.3.1
inventory
R5.3.4 - Average
is results
blindly Truck
truckCycle
executed Time analyzed
according KPItoisstandard
monitored
and to 1. Check into
products if the Average
inventory Truck to
without Cycle
knowing Time KPI product
which isand monitored covering
to expect._x000B_3. all received
Check 5 1 - All requirements
R6.1.1 and R6.1.2 met​ . met, but two of the
are •requirements.
Theshould facility ensure
should that havealllive unloads. 4 N/A N/A N/A N/A N/A N/A N/A
reflected
and reflecting
R6.2.2 - Unloading
in
SLAs in
are results
defined histogram
and tracked with T1/BSC 7.
2. Check of if SLAs actions areare taken
defined andsolve tracked problemswith T1/BSC improve
to ensure loading/unloading
trucks' arrival other
missing. requirements are missing. • DC A general guideline is to have orders 10% loaded
to 25% areopen accurate, even theor
time windows orders
capacity that abovedo notwhat needappointments
picking. are booked for dock usage.
covering
R6.1.3
actions -areall defined
Processreceived defined
to trucks
improveand including
updatedmarketplace outlining how to trucks thereincluding
ifefficiency is a process marketplace
in place to suppliers, and unload and
receive marketplace products replenishment
and to doactivities
pallet 3 - R6.3.1
others are is met, but one of the others is
missing. • ATCT
For best monitoring
results and should
awarenessbe stratified of warehouseinto different PIs such as
performance, both waiting
inbound time, andunloading
outbound time, loading at
stay-times time,the departure
DC shouldtime, be and
MANAGE TO IMPROVE ensure trucks' arrival happens during a certain interval of happens during a certain interval of time and product accuracy 1 - R6.2.1 is met. With disciplined focus, coordination with the carriers, and proper workforce planning in the warehouse, this metric could be brought N/A N/A N/A N/A N/A N/A N/A
suppliers,
receive
R5.3.5 and unload
-marketplace
Actions are and replenishment
products
taken and to
to solve do pallet
problems activities
and are 2. Check if the targets
deconsolidation of mixed andpallets_x000B_4.
performance areCheck communicated employees' to employees
awareness in the missing.
0 - Requirements R6.1.1 and/or R6.1.2 are not others. understood and tracked. Often this may involve coordination with the guard or checker.
7.0 PRODUCTIVITY IMPROVEMENTS time and product accuracy 3. Check if actions are taken to solve problems and improve SLA compliance 0 - R6.2.1 is not met. down. On the converse, some DCs with unreliable carriers or distant source points may need to overcompensate with additional N/A N/A N/A N/A N/A N/A N/A
R6.3.2
deconsolidation
reflected - Targets
in loading and
of mixed performance
pallets efficiency are communicated to 3. Check procedures
standard if ATCT results are analyzed 1 - R6.3.1
met, or threeis met, but
of the two requirements
other of the others is are • DC should have a Gate Control, including checks for safety, product quality, and product quantity as recommended by the Asset
R6.2.3 - Actions areand taken unloading
to solve problemsresults and vacant timeslots.
7.1 WNP Management employees
R6.1.4 -- WNP
R7.1.1 Receiving KPI is process
monitored for mixed pallets and/or
and information used to 1. 4. Check
Check ifif WNP actions KPI areistakenmonitored to solve andproblems
information andused improve to improveresults results missing.
5 - All requirements met​. and TheLoss labor Prevention
planning team,
tool Zonenot
should Safety, only be or the used Security
to plan group.
for the future but should also be used to analyze previous performance. 4 N/A N/A N/A N/A N/A N/A N/A
improve SLA compliance • SLAs should be defined with the management load team.
R6.3.3
marketplace
improve results - ATCT results
products are
is analyzed
executed according to 2. Check if productivity is tracked in all warehouse areas (e.g.: sorting, picking, 0 - Requirement R6.3.1 is not met,
3 - R7.1.1 and R7.1.2 are met, but one of the of the other • DC
Proper should have
use analyze a
of this tool digital tool
should such as
result in improvedtrack&trace to give
productivity demand visibility
and reduced overall cost. and help optimize service.
7.2 Telemetry tool R7.2.1
R6.3.4 - All forklifts arehave telematics and warehouse andareas 1. Check if all forklifts have telematics and warehouse teams trained and qualified 5 - All requirements met​. •• The
DC should
site should have data by brewery/soft
equipment control and drinktrack plant withor carriers.
a minimum 12-month historical database available to analyze and for use 3 N/A N/A N/A N/A N/A N/A N/A
R7.1.2 - Actions
standards Productivity taken
is tracked to solve in allproblems
warehouse loading, unloading, repack, and others) requirements
others is missing. are missing. • Use
Schedule as much labor asshould
possible be individual
based on performance task completion information,
time to simulate places with
optimal union restriction
resourcing and should
compare use the information
to current sizing.
teams
improve trained and qualified to use in this technology to use this technology 3 - R7.2.1 is met, but one of the others is management tools to improve results
7.3 Productivity Initiatives R6.1.5sorting,
R7.3.1
(e.g.: -- results
All employees
Employees picking,are involved
cross-trained
loading, unloading,receiving
to perform process
repack, andare 1. 3. Check if employees productivity are cross-trained
is tracked to perform different warehouse
at the individual/employee level job 5
1 - All requirements
R7.1.1 and R7.1.2 met​ . met, but two of the
are •supervisor
DCs
Variable should action
haveand
compensation individual
initiatives should feedback.
to measure
be in place theShare in shiftproductivity
toproductivity
improve handover
of all warehouse only
at the theindividual
group performance.
workforce. This(tracking
level makes iteach possible to have productivity
employee's a data basis to 3 N/A N/A N/A N/A N/A N/A N/A
R7.2.2
trained -inActivities the standard are visible in real-time and the 2. Check if the DC has visibility of its activities in real-time and the information is missing. • The telemetry data should be used to improve productivity re-designing the layout/ABC curve to reduce travel distance and be
different
others) warehouse jobprocedures
functions according to the SKAP functions 4. Check ifaccording results are to available
the SKAPtomatrix the frontlineand informationduring and/or is used to improve
at the end of the shift 3 - R7.3.1
others is met, but one of the others is
is missing. train
results). the whole team, open new GAPs, have fair variable compensation, and reduce idleness.
information is available to operators during and/or the available to operators during and/or at the end of the shift. 1 - R7.2.1 is met, but two of the others is used as input for the sizing process.
matrix
R7.1.3and information
- Productivity is is used to
tracked at improve
the productivity productivity
and used to improve productivity missing.
0 - Requirements R7.1.1 and/or R7.1.2 are not • DC should promote evaluate initiatives
WNP GOPs to improve
and define marketplace SKUs handling.
actions if productivity targets are not achieved.
end of the shift and used to improve the daily routine 3. Check if DC is monitoring FNP KPI. missing.
R7.3.2
individual/employee - Initiatives are level defined to improve productivity 2.
5. Check for if a initiatives
sizing simulator definedused to improve
to improve productivity
productivity suchon asasynergy/shared
weekly level 1 - R7.3.1
met, or threeis met, but
of the two requirements
other of the others is are • DC
Individualshouldperformance
define any other mustinitiative
be analyzed, to reduce if existsemployees'
union restrictions paid hours. provide the feedback if necessary in 1:1 session not in team
R7.2.3 - FNP tracked with clear correlation to 4. Check if the information is used to drive to find GAPs and improve daily 0 - Requirement R7.2.1 is not met, or three of
such
R7.1.4 as- synergy/shared
Results are available workforce to thebetween frontlinewarehouse during workforce between warehouse and delivery or alternative work schedule to reduce missing. •sessions
DC should define SLA with delivery team to share the workforce.
improvement productivity, and safety the other requirements are missing.
and
and/ordelivery
at theor end alternative
of the shift workandscheduleused to improve to reduce employees' paid hours. 0 - Requirement R7.3.1 is not met, or three of
R7.2.4 - Action are taken to solve problems and improve
employees'
productivity paid hours. 3. Check if technologies are used to help track productivity of all daily activities and the other requirements are missing.
productivity, and safety
R7.3.3
R7.1.5 - Technologies A sizing simulator are usedis used to help
to improve track productivity information is available to all employees during or at the end of the shift
of all daily activities
productivity on a weekly and information
level is available to all 4. Check if the initiatives to improve productivity are used as input for the sizing
employees during or at the end of the shift process
R7.3.4 - Initiatives to improve productivity are used as
input for the sizing process
Questionnaire - Delivery Pillar 73%
Reporting Period: Targets : 73% 68% Mandatory: 0
Facility Name: 68%

Question
Mandatory ID Question/Topic Requirement How to Check Scoring Guidance DC Comments & doubts Global Owner Feedback WH - DDC WH - ABI #REF! DEL - DDC DEL - ABI #REF! DDC
Weight
DELIVERY PILLAR N/A N/A N/A N/A N/A N/A N/A
FUNDAMENTALS N/A N/A N/A N/A N/A N/A N/A
1.0 DELIVERY EXECUTION PROCESS N/A N/A N/A N/A N/A N/A N/A
1.1 PRE ROUTE R1.1.1 - Pre-route delivery process SOP is updated and includes all critical 1. Review the pre-route delivery process at the 5 - All requirements met Purpose: By collecting the time from when your team arrives to the DC until they leave the gate for delivery, we are able 1 N/A N/A N/A N/A N/A N/A N/A
1.2 ON ROUTE operational
R1.2.1 - On-route steps (clock delivery in,process
huddle, SOP routeiscollection,
updated and inventory/quality
includes all critical DCReview
1. (clock in thetoon-route
gate exitdelivery with delivery process truck).
at the 5 3 -- All
Only missing R1.1.5
requirements met to have better
Purpose: In order visibility
to provide into the total productivity.
a customer centric delivery, It is important it is importantto understand for oureach teamstep members and expected to be trained time in oneach the step 1 N/A N/A N/A N/A
N/A N/A N/A
verification, steps
operational safetyand checklist,
common at minimum).
one-off steps in the on-route process. Check
DC (gate forto DC specific
gate). Check SOP forwhich DC specific includes SOP all 3 1 -- Only
R1.1.1, R1.1.2R1.2.6
missing and R1.1.3 are achieved because ifprocess
standard the truck departs
toroutedeliver inlater
a safe, thanproductive
planned, this andand can customereffect the centricentire day of the delivery team and result in missed
1.3 POST ROUTE R1.3.1
R1.1.2 - Post-route delivery process isSOP is updated and includes all critical 1. Review ofthe thepost-route delivery process DC at the 5 - All requirements met Purpose: The post inprocess should be defined streamlined toway.get the delivery professional into thewe DCcan andhelp on 1 N/A N/A N/A N/A N/A N/A N/A
R1.2.2 -- Pre-route
operational On-route
steps
delivery
delivery
(5S, inventory
process
process is
validation,
executed
executed Delivery
according
according Vehicle
to the
to the SOP.
Inspection
SOP. sections
which
DC (gateincludes entry
pre-route
all
with standard
delivery
process steps
truck
for
and
to
acommon
clock out). 5
0
1 --- R1.1.1,
3 R1.2.1,
Only
R1.1.2 or R1.1.3
R1.2.2R1.3.5
missing and R1.2.3are NOT
are achieved
achieved time windows,
their way back
changes
home in the
sequence,
most
refusals
productive way
and more.
possible.
By better understanding
By defining the process
the time
and
spent in the
monitoring execution,
DC,
you
1.4 R1.1.3
DELIVERING QUALITY PRO R1.4.1 -
- All
The
R1.2.3 - All Delivery Delivery
process Professionals
to report
Professionals product are trained
breakages
are trained and knowledgeable
is digital
and knowledgeable with about
reasons
about the
code (clock
1. Review in, huddle,
there isroute
a on-route
processcollection, to report and 0 --- All requirementsormet the
Purpose: delivery By team
training streamline
–our team tasks
members and inget to the
identify truck out for
quality delivery
allissues,
steps awork quicker!
to report and correct them doensures
to havewe are cangiving 1 N/A N/A N/A N/A N/A N/A N/A
Report/Safety
pre-route
linked to SOP.Checklist,
delivery quality financial, root
index. cause analysis/action closure, at the on- breakages.
one-off
Check steps
for
inventory/quality DC in
Check
the
specific
verification,
that process
delivery
process.
which
safety should at 3
checklist
professionals 1 -
R1.2.1,
R1.3.1,
Only
R1.2.2 and
R1.3.2
missing
R1.2.3
R1.4.5R1.3.3are NOT
are achieved
achieved • Delivery
help
our remove Execution
barriers SOP
during should
thisproductspost beroute placeprocess. including delivery professional should a successful
2.0 EMPOWERED TEAMS route SOP.
minimum). 2. Check
encompass if there is
all stepspartiala tool in
to be refusals,place
followed that to track
everyday 0 -- R1.4.1,
R1.3.1, R1.4.2
R1.3.2 and
or R1.3.3 day.customers The main steps the best of On quality Route process to should
sell to end consider: consumers! On Route Navigation process, Delivery Execution at POC, N/A N/A N/A N/A N/A N/A N/A
R1.1.4 -- The
R1.4.2
R1.2.4 Pre-route
Technologyprocess Delivery
istoinreport PI (clock
place product
to informin breakages
to truck
gate real-time
exitiswith delivery
executed
location. truck), if out
according to of are minimum).
able to register
deliveries. reason 1 R1.4.3are NOT
are achieved
achieved Guidance:
Quality Assurance (e.g.: correct product handling, prevent wrong behaviors with the product, truck quality standard,
2.1 RESULTS VISIBILITY R1.3.2
compliance -- execution
Post-route
to target delivery
there is process is plan
executed according to the SOP. and it should thebe broken down into critical area 5 •• Delivery Post-Route Process – all
SOP should be in place including if the all steps since delivery teams toarrive at theprofessional
aDC for check-in
R2.1.1
delivery
R1.2.5
R1.3.3 --- All
Delivery
On-route
Delivery
Professionals
SOP.
Delivery
Professionals PIan (gate action
are able
to gate),
are
inif place
to view out the of and
daily isteam
compliance consistently
performance
toabout
targetthe there of 1.2. Check
codes
3. Check areif that
linked
that alldelivery
all delivery
to delivery
delivery professionals
professional
quality
professionals hasare
index arethe 0 -- All requirements
R1.4.1, R1.4.2 ormet
R1.4.3 are NOT achieved Purpose:
•other), SOP needs To
Quality toIssues
drive
Professionals include
engagement should
Report critical
(e.g.and
know steps
partialhow the
performance todelivery
refusals identify professional
achievement,
registration product
of with
it (driver/operator)
isclear
is important
in good reason tocodes
condition should
give each
linked dodelivery
be to
to have
delivered,
Delivery successful
different
Quality day,of
visibility
types
index), 1 N/A N/A N/A N/A N/A N/A N/A
2.2 FEEDBACK PROCESS improving
their
an main
R1.4.3
is
R2.2.1 action Allfor
- Once routinethe
Delivery
plan thein last
PIs 4and months
Professionals
place
visibility KPIs
and is or
to daily are trained
YTD.
according
consistently trained
performance
and
to improving
DC’s
and knowledgeable
is main challenges.
knowledgeable
provided,over the
Deliverylastabout
(5S,
trained
ability
(product
4 months or Inspection
trained
1. Once
inventory
and
toand view
breakages),
the
validation,
knowledgeable
the daily
knowledgeable
Delivery and Delivery
performanceabout
allabout
Professional breakages Vehicle
this
this
has SOP
ofprocess
their
are
visibility 3 -- All
5 Only missing R2.1.4
requirements met
until
fromRoute
into
quality
On
Purpose:
the
arrival
their warehouse
issues
Our at Delivery
results,
Closing DCcompensation
and until
whatphysical
procedure. the
to do check
Professionals
check
in and out.isachievement
instances over.
are the ofThe quality
key
main steps while
toofdelivering
additional/variable
issues Post
productsonRouteroute with
process
compensation
and aftershould
quality they or come
customer
consider
incetives back
service
physical
andtoand recognition.
DC. closing
efficiently,This
and
so it 1 N/A N/A N/A N/A N/A N/A N/A
post-route
R1.1.5 SOP.
Pre-route Delivery PI (clock in to gate exit with delivery truck) is under (through Report/Safety
skills matrix/OWD). Checklist, financial, •financial PI
DCofshould closing.
pre-route time should bebe monitored infroma way
MANAGE TO SUSTAIN
R2.1.2
standard -
YTD. - Post-route
Professionals
R1.3.4
Delivery
Zone/BU suggestProfessionals
trainingcorrective
Delivery
are
for product
PI (gate
able
actions entryto
to
quality. view
improve
with
the
This training
delivery
daily
the truck compensation
is validated
operational to clock KPIs. and
in the
out) if out DC’s
team
reported
(through
to main
performance,
root cause
in routine
skillsa digital PIs
matrix/OWD).
check
analysis/action
way. and KPIs
thatclosure). according
they are able to to 1 - R2.1.1 and R2.1.2
3 - Only missing R2.2.4 are achieved information
•Some
•is Ifkey
needed,of
to theshould
get have
actions
feedback
frontline
abe that accessible
process could
to help
should
applied
improve
report
inexpected
aby
traffic
digital
delivery
the way
process,
violations/parking thethat
without
professionals automatically
front-line
communication leadership
tickets
and/or
are to or
collects
intervention.
checkers
related management.
Supervisor
clock
to identify
to refusals inmodulation,
andand DCregister
It is important
departure
changing daily
to provide
timesthe
thewaysfrom
products
payment the
to
the
incentive
proposed achievement
target YTD. to target and they understand how to achieve these. 3. Review main Pre-Route
challenges. Delivery PI (clock in to 0 - R2.1.1 is NOT achieved DC gate. This should be gathered N/A N/A N/A N/A N/A N/A N/A
SKAP/training
R1.2.6
R2.2.2
of compliance On-route
- Delivery dashboard.
tonot Delivery
Professionals
target there PI is(gate
areactionto gate)
able toplanis under
provide theand
feedback proposed
is about target
their YTD. 2. 2. Check
4. Checkcorrective
suggest that
On Route the standard
Delivery
actions Zone/BU
toPI (gate to
improve training
the for
gate) is 1 - R2.2.1 and R2.2.2 are achieved before
method,
•easily
leaving
input performing the DC
feedback risk orassessments
and when
showphysical ourand
they return monitored
(when
Delivery from the
necessary) compared
Professionals market onthat to amanagement
with
the PI that
quality
POC, helpshas
issues.
reporting your DC achieve
unexpected
reviewed stops,
and the Total
and
responded Productivity.
reportingto feedback to
3.0 PROCESS EFFICIENCY This
R1.4.4visibility
performance - Delivery is
or individualized.
Quality
issues Index
during ifanbreakages
their day usingare
inout
a digital
place ofplatform.
compliance consistently
to target gate
2. Check
product
monitored
operational
that
exitquality
with
that allhas
according
KPIs
delivery
delivery
performance
using beentotruck)
professionals
isisreported
completed
impact
problem-solving
monitored
on the forinare
business, all a aif 0 - R2.2.1 is NOT achieved
tools ••customer
encourage
DC prioritized
When
DC
DC can
should define
Pre-Route monitor
complaints.
more
a PI
PIs to
Departure
should
feedback!
control
breakages be time linked (from
database to KPI process
delivery
onTrees a daily accuracy basis to
professional
according to tobetter topicmeasure
arrival
analyze until
15 - KPI
cause, the
theytype, leave
Tree success
from
quantity, of etc.
the Management
DC) this
is out process
of compliance
Pillar to N/A N/A N/A N/A N/A N/A N/A
improving for the last
plan4Professional's
inmonths or YTD. trainedway,
according andto knowledgeable
impact onand business, about avalidated
targetpost-route • The Postevolution
Route PIs:
3.1 SIZING TRACKING
R2.1.3
there
R2.2.3
R3.1.1
is--an Daily
The action performance
Delivery is provided
place and in a digital
isfeedback
consistently way
improving
isdelivery
reviewed, (through for athe
responded mobile phone applicable.
lastto4and digital
delivery
target and
is professionals
assigned delivery
and professionals
can
corrective beactions ifisout
receive in ait ••target, Delivery create Executionactions
of frontlineat based
POC on
empowerment
– the root
teams should cause
starts be tocomplied
correct
with internal issues
with at before
communication,
least: they
1) Risk impact
which the
assessments next day’s
is providing (when results.
results necessary) At times,
visibility andthe
on this
all
1 N/A N/A N/A N/A
or other-inor
R1.3.5
months
The
Post-route
digital sizing
YTD.devices).
tool
Delivery is in use PI (gate to track entry cost
withand productivitytruck toSustainability
clock out) is 1. Review
process
assigned
to help their
SKAP/training
of compliance
that
(through
and DC DC
corrective
solve hasthe
skills
dashboard.
to target.
a actions
sizing
matrix/OWD).
root tool
are for
cause people
inofplace
the is if 5 - All requirements met Purpose:
-could
relevant Totalbe Having
Physical
from
isinformation
a
Check
different good
to the sizing
Time:
steps since
in
frontline process
the the pre-route
using helps
drivers
the us control
come back
process
available –tools.costs
to the
investigate and
Itmust anticipate
DCexpected
should until
be finish
followed needs
and thereal in
Physical
by staffing
times
having Check or
ina each
strongfleet.step. By
feedback reviewing
2) process
the N/A N/A N/A
posted
FINANCIALS AND PRODUCTKPIs
under to-simulate
R1.4.5the
team
proposed room
scenarios (all kinds
target daily
YTD. ofand feedback).
weekly using forecasted volume from the and2.
or 3.
Check
vehicles
outReview
of
that the
based
Post-Route Delivery
onphonePIs
aDelivery
Professional
to simulatePIroutine
(gate also
changes
toentry
3
5 -- Only missing R3.1.4 -•POC.
budgeted
• Total
WhatThey must
Delivery
sizing,
Financial know
Professional
understanding
Closure the Timeprocess thetoof
feedback? past safety and It isreports
every and
anticipating informationthey
the future be
exchanged aware
forecast of potential
with
will drivers
help us controlrisks
in daily at POC
routine
costs Level;
and that
atallocate
POC to
contribute
3.2 R2.1.4
R3.2.1
R2.2.4
weekly -S&OPDelivery
From Professionals
thefinancial
Quality
routine. Delivery budget
Index are
is under
Professional's able
performance tofeedback,
view
proposed the
(actual daily
thevslargest
target compensation
budget
better than & actual
issues LYare andvs
(YTD) problems
1.
3.
5.
and
Checktocompliance.
Review
able
Understand
with give
different
delivery
(via
that
the mobile
DC has
existence
feedback
opportunities
scenarios
truck to
of aaor
monthly
using
clockaccording
out)
other
database
in digital
the
is to
digital
Onplatform
Route
volume
monitored
to All requirements
1 -- Only
R3.1.1 and R3.1.2
met
are achieved
when
Purpose:
Greeting
solving
resources
-changes
DC needs
Routes
employees
problems
and
with
toorder
Financials look
efficiently!
are
and
variances
forare
check; opportunities
able
provides
%
to
3) provide
important Unloading
inputs to todecrease
suggestions
monitor process;
action on athe
logs and
4) time
routine reply
allowing
Empties spent
result
basis in
improvement
loading the
to deviations
control pre-route
with in with
costs
the process
and
results. root-cause
organization should
Feedbackthrough
be analysis
(refusals, cantechnology
analyzed be toprovided
help
quality..) theor process
develop
package
when through 1 N/A N/A N/A N/A N/A N/A N/A
incentive
LE) is reviewed
in the top
analyzed achievement
Zone
monthly in the
quartile.
and to
monthly target and
routine. they understand how to achieve these. 4.
devices).
Understand
review
analyze
time used the financial
breakages
in the opportunities
budget
(cause, type,
orrouting/planning in the
performance Pre
quantity,
process Route
(Actual 3 missing R3.2.4 action
level.
applies; Itlogs. toimportant
is5) drive
Finally,
Customer autonomy.
frontline
thatCentricour but staff
management
approach: should beteams
Deliver encouraged contactand
understand
anyevaluation, prepared/trained
that actions
possible POC for to make
sizing
problems; of6)peoplebasic
Behavior decisions
and based
fleet resources
required by the ondelivery
can not
4.0 CUSTOMER SATISFACTION R3.1.2
This -- The
visibility The sizing toolaction
is individualized frequency plansand
and delivery
are review
createdprocess and on is
professionals and DCare
track
defined to execute.
able and toleadership
access this vs
(routing
demand.
according
time
3. Checkused
issues
if to
intheimpact
the
suggestions,
delivery onvsbusiness,
routing/planning professional
POC a target
process
time is
has theand 0 -- R3.2.1
R3.1.1 and
and R3.2.2
R3.1.2 are
are achieved
NOT achieved the
••teams
available One
available
possible
standard
information way to
tools
encourage
also through
frontline autonomy is having
provided
a21fully
between
digital
leadership
process
and the
in close
times22 the
team.
delivery professional N/A N/A N/A N/A N/A N/A N/A
R3.2.2
appropriate for
sizing
DC cost
tool is connected
management.
to financials delivery Budget
driver,
versus
windows,
2. Review
others).
executed,
POCand
the
Actual
geocode,
frequency
LE).
Total Productivity,
closed
and process streets, Capacity
of review
1 only
• The
impact
Deviation to guarantee
sizing
productivity
analysis
tool a the
should isand and
guided
be
tools
informationservice
aligned by inManagement
order level,
record to provide
but
(i.e.: Pillar a better
financials!
geofence on service
parking,
topics: -level
open/start to the
Abnormality customer.
the visit,
Treatment; the - visit
Routine at POC,
Monitoring.etc).
4.1 CUSTOMER SERVICE QUALR4.1.1
without
uses this -intervention
All
to Delivery
control Professionals
costs
of leadership.
and analyze are sizing
trainedimpacts and knowledgeable
on VLC. about assigned
1. Review
productivity
ability
2.
4. Review
Occupation
warehouse to view and
the
recent
(%
corrective
gainsstandard
their
issuessizing
truckinor Total
daily
tool
performance
idle
actions
zone Productivity/CO
variable
is connected
capacity)
complaints, of are
training in
compensation
theand
sales,
place
(i.e.:
to
Delivery
workingand if 5 0 - All requirements
R3.2.1 met
is NOT achieved Purpose:
••connects DCs
It
DC is areBuilding
important
should with
able lookanother
to
that
Customer
prioritize,
for person
delivery
best ideally Centric
to
professionals
practices/initiatives 3totobudget
perform Operation.
5, aPIs simulator
pre-route
within
understand
to
Our
reduce the from
customers
process
whatlist from Planning
task
makes
inefficiencies themust Pillar
(clocking be the
Delivery
their
during routes
according
in, top
Execution
deliverymore
focus
inventory at
toProcess
ofquestion
productive
POC.
our
validation, to1.1
operations
with DVIR
provide
a
- Budget to grow
(Delivery
daily
customer-centric
Process,
our
results 1 N/A N/A N/A N/A N/A N/A N/A
R3.1.3 -- When
standard DC compares
Zone/BU training actual for operational
customer inputs quality.
service (volume, This # oftraining
deliveries, # of
is knows to
outthe
SERVE of local
compliance. simulator
Training) for are toappropriate for DC •Creation, andPIs LE
4.2 R3.2.3
CUSTOMER COMMUNICATIcustomers,
R4.2.1 - DC hasthe
fleet
delivery
a process
available,
budget
and
and toolistounfavorable,
people communicate
available)
thewhen
and
delivery
Sustainable
manger
the order KPI leaves numbers
or
the cost
1. incentives
financials
Quality
Check
hours.
customers,
management.
of
Index and
that deliveries
connected
it helps
KPI
DC
people/HR, andcustomer
has per
aDC truck.
managers
ifcompensation
there
process isservice
individual aand target to
toolhas
control
etc).for
to 3 -- All
5 Only missing R4.1.5
requirements met business
Vehicle
visibility.
•Purpose:
•approach. DC's
It
Theshould
execution
and
Inspection
The
delivery
Provide reputation
Theestablished
be must
leadership
driver
of visibility
sizing
building
Routine)/safety
isbe thein
associated
amust
and
customer
standard
delivery
loyalty
understand
connect toand
checklist).
with
problem
online
pillar
the trust.
and
customers
should
KPIs beAthat
solver
channel be
Customer
able
to are
to points
at receive
all
(exchange,
from the
explain
plan
Centric
a priority inset the
empties).for
budget Mindset
the
delivery
suggestions/feedback.
in
asDCs.
Planning
well must as be
journey.
Pillar
actualsintegrated (savings
It is important
Drivers’
question feedback
2.3
intoand
-
DPO
to keep
and
Resource
in ina simple,
deviations) contact
interaction
Sizing
and
in 1 N/A N/A N/A N/A N/A N/A N/A
validated
the top route in the
3 reasons SKAP/training
of unfavourability dashboard. versus budget and puts an action plan in 4. Understand
been
costs completed
performance
andthat analyzeand opportunities
for
they allvolume
sizing Delivery
understand
impacts inand the on Post
Professionals
how VLC. Route 3
to 1 - R4.2.1,
R4.1.1, R4.2.2
R4.1.2 and
and R4.2.3
R4.1.3 are
are achieved
achieved yet
• Technology
its It'seffective
veryway
connection way
important to throughout
set and
that each exceed
DC our
select customer’s
PI(s) that effect expectation. delivery performance to order,
show to
it isoperators. The list ofor
isPIs as
4.3 IN FULL DELIVERIES DC/on
achievement
R4.3.1 - Refusal to customers.
compared
process to SOP
plan. is updated, contains all critical operational steps breakage
communicate
3.
3.
1. Check
Review
Check that
thethat the
pushed
the
refusals
the DCdelivery
DC closes
process
is teams
monitoringthe can
contains buffer
feedbackcost measure loop 5 -- All
critical
and requirements met •with
•a
Purpose: The our
digitalDC customers
As
needs –toMain
should
part
sizing.
toofhave contribute
information
OTIF, ashould
In
standardized
Full their
to about
their
allowsorder us
toolprocess.
empowerment
route toin should
measure
which If aitand
be: change
can
outTrucks
ownership.
ofsimulate happens
Real
stocks, time
scenarios
refused tolocations;
Feedback their toexamples
product Total
optimize and important
time
are routing
and KM
cancellations.
resources that
issues
whileper
As thisroute; ofService
R4.1.2
place to-- close
R4.2.2 Ratehas
DC My
gaps. Delivery
The budget and Customer
performance Complaints
is improving are collectedover thefrompastall 4 time
3. used
validated
achieve
Review
themselves in
through
them. cost the
against routing/planning
the
management on SKAP/training
abedaily that
basis. process
exceededdashboard.
Validate and the 1 0 - R4.2.1
R4.1.1 and
or R4.1.2 are
areNOT achieved Pre-Route
•ideas Theper could
current PIs:
be KM Service
to budget Time thisDeviation be linked by POC;
to delivery ETA Adherence;
costs, including On Time %;
fuel,tomaintenance, KM Deviation and ;others,
Sequence and it maintaining
part
Adherence;
should be built 1 N/A N/A N/A N/A N/A N/A N/A
R3.1.4
to modulate -or DC is in acompliance
refusals, processand all and with tool
Delivery Cost toProfessionals
communicate
and Productivity orders
are not and
Sustainability
trained routed/planned
KPI (delays)
by forto
reviewing,
productivity
steps customers.
responding
Sustainability
modulation tosavingsand
KPIs
performedposting
(e.g.Check in team
volume,
by # 3 -- Only R4.2.2
missing R4.3.5 achieved communicated
time
suggestions,
•high
delivery, service POC;
we POC
level
must Order them
time
standards.
work as
locations.
windows,
together helps toPOC drive
drive geocode,
not transparency
In Full closed
reductions and
streets, allows
close them
warehouse
to 0 and be ready
issues
make orto
sure receive
complaints,
all product their sales,
ourorder. customers,
customers
4.4 ON TIME DELIVERIES available
months
R4.4.1
for the agreed - DC sources.
YTD.has upona defined and appropriate routine This(TOR) withordersthe router to productivity
2.
1. Review
expected
that actions thethat
budgetgains theand
todaily in DC Total
routine
eliminate Productivity/CO
aisprocess
monitoring
with
delivery plan.
the Rate
operation
quality toolissuesMyand
with 5 - R4.2.1
All requirements met Unexpected
considering
•Purpose:
Customer
Average The Service
Pre-Route
Attempts;
performance training
daily connection Departure
Delivery
intheshould
Km/miles time.
Quality help
with thefrom employees
Index
DC the router& previous to
breakages;
is criticalunderstand
year. Delivery
for a good and internalize
Ratings;
on time Customer the
performance principles
Complaints,
as of customer
etc.
it istocritical align ask for
service
tosolution 1 N/A N/A N/A N/A N/A N/A N/A
achievement
knowledgeable
R4.1.3 -- prior
The YTD.about
Customer Ifdelivery
DC
this isSOP.
Centric outday of to customers.
compliance
Delivery
action plan YTD,
Professionals
is updated
includes
thethere tohave is athe
eliminate strong abilityaction
customerto solve 2. Check
room.
plan and
of POCs,
delivery
numbers
Delivery
that
teamfleet
of
and
DC has
available,
and
deliveries
Customer ensure per and
istruck.
Complaints people
autonomous and available)
from
to 0
1 -- Only
R4.3.1, isR4.3.2
NOT achieved
and R4.3.3 are achieved people/HR,
•••during
is Ifdelivered.
tracking
Important solution
compensation,
KPIs/PIs needs
topeople
manage: etc. delivery professional's intervention, check if they can explain how use the
MANAGE TO IMPROVE R3.2.4
discuss
pushed/buffer
in place
Delivery
andrefusals andfinancial
performance
KPIs cancelled,
are
performance
for
consistently
focus
at minimum.PIs,
improving
isroute
under feedback,
forand
YTD
the under)
budget.
resource
last 4 months.
availability the
are delivery
CORE
in
communicate
4. their
in Check place. if are
sizing
team
teams
the with
DC
process.
if(validated
there
the
has customer
analyzed an by action
attendance,
when
the Delivery theallorder
plan in 3 missing R4.4.5 quality
resources Morning
The
DC
The
and
budget
should
standard ofto
meeting
be
dailyofexecution.
obtain
control
fleet and
able to loop
closing
clarity
attendance
should about
notifytechnology
The for PI:
consider
so
theeach wewhat
%
customerof
also
plan the
People
to
should
feedback
ABI
freight
deliver
whenever expectations
attending
help costsall
and
will initiate from
volume
there to
solve
either
towards
Morning
SPOTthat
aretheir changes
from is it.
meeting
Carriers. Also,
received.
problems
resultsto the DCtraining
according
If
without
release needs
there
expected should
areto
to
leadership
or any the
have provide
capacity
orderafter standard
a
pushedclear
or how
interference,
any problem process
SLA to deal
definition.
issues,
volumethat to
found
with
hire
it is
andis,buffer.
they N/A N/A N/A N/A N/A N/A N/A
the
and highest
service
puts issues
actions (including reasons
in place all
to autonomously.
evaluations
close gaps 3-stars
in performance. processes
available
place
actions to & sources.
control
results). intheplace deliveryfor Delivery
budget. 0 -- R4.4.1,
1 R4.3.1 orR4.4.2
R4.3.2and
are R4.4.3
NOT achieved
are achieved •1.Arriving
customer
SPOT
important
Number Carriers
to
Trips
complaints
PI: %
have of aPeople
and at POC.
aprioritization(Drivers
negotiation & Helpers)
procedure
plan to follow. inArriving
place toOn
If communicate:
there help
are time to
control
consistent DC. theseArriving
on costs.
time time must
issues, the be defined
delivery at DC level
team and can
R4.2.3
R4.3.2
R4.1.4 -- DC
- DC
Refusal monitors process the percentage
is executed of communications that gets sent to is on route.
Professional
4. Check that that feedback
the cost onacting
and alargest
monthly
productivity allbasis for There
do
during
•2. Total are
notshould
have
daily
numberdifferent
to
routineget channels
of management's
execution.
orders that Once can be
approval
inreceived, used before to
leadershipthey handleshould BEES,
customer
evaluate Bees problems.Deliver,
if feedback calls,
ishandling SMS,
consistent, andmust
Communication they ensure
should Apps. reply
5.0 DELIVERY ENHANCEMENTR4.4.2
customers. Deliveryhas a Professionals
quarterly are able
routine, ataccording
to look up
minimum, tointheplaceSOP.
critical customer
to review POC information
time Professionals
3.
4.
2.
3. Review
Check
Check
largestthat thethat tothe
budget
there
DC
solve
hasDC the
ais
isfavourability.
a quarterly on refusals
routine (at 0 - R4.4.1 is NOT achieved be
resources DC
Employees
different are follow-up
should
depending
sized Refusals
understand
on the
correctly. KPI
route.
Lastly,their ourstandard
role inwhen
deliveryimpactingmeetings.
team customer
must is have complaints,
the most especially
accurate information related
for customer damage time N/A N/A N/A N/A N/A N/A N/A
R4.3.3window,
(time - Delivery sales Professionals
rep phone arestrategy.
number, able customer
to accessphone different payment
number, etc)methods
in their the
Sustainability
reasons.
evaluations issues
inunderKPIs andare
4to star inprocess
an action plan
compliance and tool
is iftonot,
created
orwindow •to
•3.DC DC should
Delivery
drivers
Number
should ifTeam
of be
any
define able
action
main
deliveries a toPI notify
KPIs
needs
per and
toexamples
check the
to
shipment be customer
PIs:
thetaken
2T working
and
effectiveness
/isstops/truck update the
Hours oforder
the in
refusals action
transporton route
log.
modulations (leaves
(control
Also, vs
daily.the
leadership
legal DC) and
requirement),
(e.g.: should
# orders communicate
beanalyze savedCapacity theif action
ifprovide
from any
Occupation
refusal/ can # beof
5.1 NPS DELIVERY window
R4.2.4
R5.1.1
within the - length
DC
From has
driver
with
the app
E2E
a Customer
process
to source
clustering
prevent and tool
Centricity to communicate
Plan created and
in monitor
planning the
pillar, delivery
the minimum)
communicate
1.
andEnsure
that actions
the last DC place
are
4theETA
reviews
closed.
months for thereviews
review
or YTD
POCand
delivery.
Customer are
timeresponse
in Centricity 5 - All requirements met complaints,
windows
unexpected
Purpose:
(%),
executed
4. Sequence
Cases
to
NPS
per
with
orensure
event is
iftasks
needs
trip
specific
our delivery
that
Adherence,
/once).
drop could
north
to be
size
execution
star
KM impact
escalated. KPI (Operators/
delivery
that
Deviation, onDriving
drives time. usanalysts/
occurred. TimeIfand
towards technicians
possible,
a customer
Service
from
theTime centric all
communication areas
operation.
Deviation.
should is digital,
DeliveryNPS able
is
teamand toideally,
composedmust understand ofthe examples
customer
primary and
the 1 N/A N/A N/A N/A N/A N/A N/A
drivertoapp
R4.4.3
ETA
delivery team
tohas
-customers.
DC solve a one
analyzed
delivery
NPSan ofa truth
issues.
results
refusal.
fromdatabase
passives of customer
and detractors time windows,
and aligned
2. Check
time
length
4. Check
Plan
tousing
replythat
the
fromavailable
the
DC
back
DPO
has
segmentation
percentage
different
to customers.
planning of
payment
pillar.
Check
strategy.
deliveries Check
if there
with the 3 -- All
Only missing R5.1.4
orders
how
can
secondary
driving
their
track
refused
time
job
the
at
delivery.
drivers
and
align
that relate
service
with
time
prevention
to
by delivery
POC.
of complaints).
SLAs of OTIF and Rate my Delivery. It each
isperformance.
very important to analyze these results
5.2 BENCHMARK R4.3.4
R5.2.1
R4.1.5
delivery -
- Refusals
DC
The has
averageperformed
PI is constantly
time from internal
improving
collection clustering
of for
RMD the exercise
orlast 4
customer months
of cost, or
service
complaintsbetter level
than
to compliance.
methods
1.
areReview
actions benchmarking
to eliminate so drivers
process
customer can change
to focus
service on
issues 5 requirements met •5.
Purpose: KM/Miles
The refusal Benchmarking
modulation is
should
beneficial help for
to solve
an operation
each potential
to analyze refusals data based
to improve on reason, including
It allows in thethe management
process 1 N/A N/A N/A N/A N/A N/A N/A
R4.2.5
with
LY
and actions
(YTD). - equipment
performance DC assigned
is communicatingtypes,
for the
Sustainability
anddelivery
delivery
80%KPIsorfor
prioritization
team
more todelivery
ofimprove
thedelivery the three based
teamgaps.
types on E2E
members.of order clustering
This is
3. Verify
messages
DC’s
payment
service survey this
type
level, sent information
results
ortoapply customers
productivity
is available
for credits
NPS anddelivery
using
in
cost order
in aand if 1 - R5.1.1 and R5.1.2 are achieved
tool
SKPIs. to 3 - Only missing R5.2.4 •Simple
and
6.
each
team ETA create
Vehicle
viewplans
toshould
stakeholder.
look
ofbeCustomer
utilization
at the shared
toDC improveshould
operation
Clustering
with our
the customer
POC
besegments
by able
clusters
/ POC
toeveryallow
and
Segmentation
perception.
time the itmodulation
identify changes.
top Use / customer
and
End When to End
process
bottom the (E2E) is
feedback
totruck
performing
Clustering:
be performed tonextcontinuously
deliveryto the POC,
in professionals
an increase
autonomousreal-time tocustomer
truckbyvisibility
way
provide the
focused
closure
strategy
communication
R5.1.2 -isQuarterly,
lessis than
that available
toifis 48 hours.
customers.
the in the routing
delivery team and
performed a deep execution
dive process
into through
theif delivery and
this isto over
database, decrease
experience/logistics as80% one the
of single lead
allissue
3 and time
source
order- review toof solve
truth,
communications.
primary them.
being and 0 -- R5.2.1
R5.1.1 and
is NOT achieved RMD:
Step
canSales
satisfaction, be1: Cluster
shown think Customers
toIndex
the
andtop customer,
execute into giving
with alsoofthe
simplicity logistics/commercial
tochance
focus to open
on value segments
acreation,
dialog box that gives
building the
a competitive customer advantage the optionwhile to chat
R4.3.5
the app.- In
completed Full
DCyearly
uses PI the tracked
over routing and
performing
RACI toptodrivers/reasons
SKPI budgets of
and In Full
quarterly issues are
under prevent
Review
4. Review a forrefusal.
existing
that results
the Delivery frequency
Professional that uses the 1 R5.2.2 are achieved 7.
drivers.
•coaching Rate 2:My Curve
andDeliverypraise Survey xperformers.
mustany Additionally,
be observations
inCentric
place, Metrics there
in experience!
order to are ensure times that that the the operation
customersShould can is analyzed
not able
evaluate toeachfind a best
delivery practice
execution.
primary
known. -Ifdriver IntoFull and isKPI identified
out the
of compliance topfor routing
secondary
to the
and
target, issues master
there and/or data ownership.
an comments and available
secondary routing
drivers team,
using track
detractors andand trace
PIspassive
Step
with
balancing our Analyze
delivery
operational Cluster
team to Customer
make
efficiency and customer related (OTIF, to NPS
the and
delivery. RMD be by Cluster)
performing
R4.4.4
added On timeSKPI budgets.
deviation analysis inPlan.
place and top is drivers actionof onplan timein 3.
DC Review
runs
critical
(drivers), the
customer In full KPI
benchmark
re-routing related
information analysis.
technology, to
in other
their (if driver
customers, asapp and 0 - R5.2.1 is NOT achieved 8.DC
•This
internally,
•Step
FTE/Truck
should
It isassessment
3: Create
important
soestablish
byalookingis aDC
Plan
that
effective
externally
transactional
(build
execute a plan internal
root
to information
tooperations
assessment,
cascade
cause analysis
within
each sharing
information inorder
a DCin processes
case deliver
cluster
ofallETA of your or of
should the
externallymatch
databases
deviations,
customer to and
to with
improve
to
a similar
onehelphelp
deliverydrivers
operation,
itsexecution
quality. score.toto make
the better
management
improve
place toactions
R5.2.2 - improve
DCidentified
has to analyzed
the Customer
prioritizing &the
top Centricity
and largest
bottom issues (credit,
performing logistics,
Delivery master
Professionals scores.
cancellations,
underperforming,
to Review
solve problems. customer
benchmark
Critical credit/logistics
inshould
iscustomer beissuerun
information decisions
team
• DC A good canand andcustomer
implement
response provide goodcustomerspractices with to superior
enhance service
performance! (drivers have the50% information needed on route to respond to
issues
R5.1.3 are
data/system,
and created - Delivery an team
cancellation,
action
(trackclosed
plan etc)
to
trace
Customer
perform
and
issues,
is
delivery
Centricity
constantly
OWDs on
delay,
Plan
improving
SOPs related
fleet availability,
actions for the
toaccording
the
last SKPI,
4
other
toat quarterly,
months 2.
and
stakeholders.
systems theminimum).
at action
issue.
RACI
plan (ideally
Check if there
place built
are
to help
with -services
•customer The should
Service problems).Levelrate
collect all
1YP toaims
the
feedbacks)
instances Rate
to of My
these
improve Delivery
3the Survey
communication
quality should
of logistics happening be over
service andto the ofPOC,
divide theby totalthedatabase.
working totalon numbercustomer of orders pain pointsapplicable to
loading
due dates. process delays), if on time KPI is out of compliance with the target there sales is timeand
communicate window, others sales
roles areas)and represponsibilities
withphone clear number
actions forand tofor • Response
to
improve each Rate =satisfaction
communication
customer (# oftype. POCsand thatloyalty.
answered the survey / # of POCs DC sent the survey to) X 100. The "# of POCs DC
or better
minimum.
is an action than plan LY (YTD).
indelivery
place and is consistently improvingfor forthe thepastlast 44 months
months or corrective
2. DC
customer
or take
routing runs
and actions
an
phone internal
master in
number. placeoperator if
data maintenance. out of compliance
benchmark •sent
On For being
the
Time survey able to"
analysis: to run should a benchmark
beshouldthe number exercise for operators in order to improve the delivery performance DC can follow
of deliveries.
R5.1.4 -- If
The NPS primary driverto aiscost,improving to the that
target. should improve gaps on detractor and •Measures The to improvement of Customer proposal Communication: be connected to Zone/BU.
R5.2.3
better than
better they
than performed
the
LY DC is
LY (YTD).
underperforming
(YTD). a benchmark with another internal ABI DC within their
service level and performance delivery
5. Review
4. Check
passive
SKPIs
theDC's
scores.
(Total
RMD/Customer
on time Productivity,
KPI. Check complaint Intop Full, On
issues •PIs
the
• Track PIs:
Not
steps:track:
New the
routed/plannedEvaluators;
main reasons Recurring
=include
(# ofwhy the
orders detractors;
order was
not routed/planned Reversed
not delivered detractors;
with on the
communication Lost
expected promoters.
time.
tofromcustomer / Hectoliters
totalare # ofTotalorders notcannot Time
SKPI, 4. Review
Time
collectionand DC's
RMD)
versus refusals.
& traceCheck
identifying operators if there that are are •• Analyze
•1.
The analysis
Logistics
Identify issues:
which should
=delivery
KPIs are not both
Cancellation
reaching quantitativedue
the totheir
target and
Capacity
and qualitative
should Issues. bedata collected
Itanalyzed
should reflect
(examples the POC total managers.
of KPIs that DC
Productivity,
R4.4.5
cluster
- On Time KPI is
or quartile.
under proposed target better than LY (YTD) or in the
an external operation similar to the DC's operation.
with
3. on
Review
corrective
the top48
time
and that
actions
bottomtheclosure
(track
inservice
place
performers.
dateissues,
level adherence
if outprocessplan delivery
is checked
of compliance
%
deliver
per
New
••routed/planned)
Service
POC
evaluators
the
Level
because
deviation,
mainPlan POC
impacts
of Deliveryis that
associated
KM deviation,
per have
Capacity
truck, completed
to per
question driver,
constraints.
Original sequence 5.2 per- first
route,
Customer
Sizing
Rate and
process can
adherence,
My Delivery
per
Satisfaction segmentation
On Time affect%,
evaluation
and(PeoplePain
Refusals,
of Point
POCs
and Unexpected
to draw
Mapping
trucks sizing,stops,
action
on Planning
people
logs
etc.)
andPillar
and truck
close
top Zone within
delay, fleet hours.
availability, loading delays). gaps.
•2. Order leaves
R5.2.4 - SKPI has shown improvement over the last 4 months or better than LY quarterly to If
3. the
Check Delivery
target. and
thereSKPIs
ifsuccesses
that DC are
are corrective
management
not achieving
actions inbudget,
team can
place if availability,
Customer
•routes Create
High etc.)DC/on
Clusters
Complaints:
performing ascustomers route
(Comparable
well = (# of
as unexpected orders
get routes/Operators).
shorter peaks with (sales
timeshould
order leaves
windows volume).
andon
DC/on
lowtime It's route communication
critical
performing that DC can make to customer
best plan /possible
total # oftoorders reduce on
(YTD) from benchmark exercise. explain
the DC must show and
they pain
have points.
run an external Examples
the
3. impact
Compare for delivery)
of primary
ofperformances
delivery and
capacitysecondary
and issues find drivers
in understand
benchmark the In Full
values be inside
KPI. not the / deliveryget
clusters. day longer
/ timetime window window length
/ delivery crew (behavior)​/
outCheck
4. of compliance
benchmark improvement to theoftarget.
(with sister DCs theorNPS withprimaryother •• Master
•wrong
The
ETA DC=product
(# should
data of orders have
/ loading
(e.g. with
order
analytics
ETAopportunities
process
taking
tools
communication to
/ wrong quantity
losses). to customer the voice
/ incomplete / total of the # ofcustomers
/ unavailability​orders on and
routes
/ product
define for how to close main GAPs
baddelivery)
conditions / expire date /
driver of delivery. •4.
PIs
customer
Identify
The forDC On what
has
Time:
feedback toare the
consolidate main all complaints of each
information delivery fromprofessional
every sourceversus to make the cluster
an analysis benchmark.
and built the KPI.
companies). •• Time
5. Credit
Create inissueactions
route (e.g.
(totaltofinancials
close
route), GAPs issues).
Service identified
Time per andPOC, leverage Unexpected performance Stops, Time in Route deviation, %POCs with accurate
4. Check DC is able to show improvements in PIs: Stockout.
•Service
Statistical timemethods data, Missed should Timebe applied Windows, to do Track this and exercise. Trace issues, Delivery Delay, Out of Route %, Flexible Delivery %,
SKPI related to the benchmark exercise. • IfRefusal
•Fleet DCavailability
Lead has
time modulations
problems
to solve (reasons).
with
customer
%, Absenteeism On Time, %,DC
complaints Averagecan run
= average a comparison
Departure n° ofTime, hours/days between
SLA adherence the time
since windowsthe
the (commercial
moment and leadopened
client
- forecasted time with competitor
a complaint
volume vs
•until
Visits
companies.
actual, it was Re-Attempts.
warehouse Agreements
solved. - loading, havefleet to be - Outgood of forService) the customer, but it also should be competitive in the market and viably for
our
• # company.
of total complaints related to Logistics Issue.
•Time
% ofWindow complaints closed
management: On Time
-> Sister Brewery APAC program steps:
• Run a comparison between the time windows and lead time offered by ABI, versus other CPG or competitor companies
1. Reviewwin-win
to define and Compare agreements targetwith andcustomers.
identify critical AgreementsKPI have to be good for the customer, but it also should be
2. Benchmarking
competitive in theto identify
market and priority
viablyPIforthat ourwill be improved
company. This comparison can be run in a BU, Country, Region or DC level.
3. According to the identified critical PI and key issues to ensure the specific topic (For 1-3 month )around the PI
4. SDCA Implementation Effectiveness
5. Develop pilot program to find new ways to improve
6. Leverage virtual visit to check to coach to support the two brewery/DC to improve PI.
7. Three months to review and modify the KPI/PI
Questionnaire - Fleet Pillar 73%
Reporting Period: Targets : 73% 68% Mandatory: 1
Facility Name: 68%

Question
Mandatory ID Question/Topic Requirement How to Check Scoring Guidance DC Comments & doubts Global Owner Feedback WH - DDC WH - ABI #REF! DEL - DDC DEL - ABI #REF!
Weight
FLEET PILLAR N/A N/A N/A N/A N/A N/A
FUNDAMENTALS N/A N/A N/A N/A N/A N/A
1.0 COMPLIANCE N/A N/A N/A N/A N/A N/A
Yes 1.1 Does the site have a list of required documents/aR1.1.1 - Documents available inside each vehicle1.and Check legalized if documents upon the are competent
available traffic insideauthorities
each 5 vehicle
- All(can
requirements
and belegalized
electronic are
upon
documents
metthe competent
if legallytraffic
allowed)
The
authorities
purpose of this quesiton is to ensure fleet 1 N/A N/A N/A N/A N/A N/A
Does all fleet follow the standards that ensure R1.2.1 R.1.1.2--Fleet Equipment standards listed inwith the following
compliance with information:2. Check
1. Check ifif there there is is a a list
list ofof fleet
eachstandards equipmenttowith 5 the following
- All information:
requirements are met has the
The fundamental
purpose fleet tracking
of this question and there
is to ensure N/A N/A N/A N/A N/A N/A
Yes 1.2 1
people's - Asset type and safety requirements which are comply - Asset with typeABI's quality and safety 3 - Requirements 1,2,3,4 are met processes in place andso fleet can remainfor our
Yes 1.3 Does thesafety andapromote
site have checklista to
high quality
control the ABI's
R1.3.1
- Asset
quality
- assigned
Digital checklist number in place and ensures 1. - Checkassigned
Asset if the sitenumber has a digital checklist in 5 - All requirements are met are clear
The purpose
compliant
safety
withofall this quality
question
local, national,
guidelines
is toand ensure ABI there 1 N/A N/A N/A N/A N/A N/A
image
fleet of AB-InBev and our brands?
condition? tracked
that the electronically
operators are unable to use equipment place requirements that ensures whichthe areoperator
tracked is electronically
unable to use 3 - Four requirement are met including 1.2.1 fleet
is an that meet
equipment local,
checklistnational, process and in ABI place and
1.4 Is there a tire and liquid/solid maintenance - VIN
R1.4.1
R1.2.2 or- DisposalSerial
Visual standardsNumberof tires &for other
MHE maintenance trucks 1. - VIN or
2. Check ifthat Serial thethere Number
disposal of tires & other visual and 5 1 - Requirements 1,2,3
- All Requirements are met are met guidelines.
The purpose ofwell
thisas, question is to ensure thator 1 N/A N/A N/A N/A N/A N/A
until the checklist
- License Plate (ifisappliable)
completed andand no critical equipment
- License Plate until the is a local/zone
checklist
(ifforappliable) is completed 3 - Five requirements are met including 1a guidelines.
that they are Asare completed ensure in gaps
a quality in safety
manner.
residuals disposal procedure being performed residuals defined inexecuted
a policy according
and branding to local
of delivery maintenance
standards policy residuals MHE areand being trucks.executed Delivery when 1 - Three requirements are met including 1.2.1 This ABI vendors
quality are first
clearare and disposingactions ofarefleet inwaste
place in
to a
MANAGE TO SUSTAIN issues
- have
Manufacturer been found no- critical issues
Manufacturer have been found 0 - applicable
Missing Requirement 1,2 or 3 R1.1.2 is the
DPO step to
Master ensuring
Fleet List safe operation N/A N/A N/A N/A N/A N/A
with the final destination meeting all regulations
vehicles in and/or according to AB-InBev according to localmust regulations and/or policy according and 3 - N/A responsible
them. manner.
R.1.3.1a
- Year/model - Ifcompliance
checklist does withnot local/zone
prevent branding 1a. vehicle Check
- Year/model
branding if the site has beaaddress
checklistinthat close
of equipment as well as compliance torenewal
local,
2.0 environment
FLEET RELIABILITYrequirements? Environment
policy.
operators from
Policy
using equipment until
to
all AB-InBev
assetsthe
ensures must Environment
operator be compliant is
Policy
unable with to the
use local or 0 -- Three
1 Three requiremnts
or more requirements
are met are not met
including 1a or R.1.1.4
national,
DPO Document
and ABI guidelines.
Tracking and N/A N/A N/A N/A N/A N/A
- Km (miles)
R1.4.2 orare hours - Km (miles) or hours of environmental issues 1
2.1 Does the fleet team understand the needs of its completion,R1.2.3
R2.1.1
- Capacity -- PIs There
Number defined
checklist orzero
percentage
are environmental
aligned
completion of
withassets
%Capacity
forthe issues
most
legally
2.
zone
1. Check standard
Interview
equipment
if the thenumber
until Warehouse
theTare checklist and Delivery
is completed. Ifrelated5
when--to
Requirement
requirement
All 1.2.12 is
requirements
applicable
not
not
all met
met
met R1.4.2
R1.2.1
The Environmental
Fleet GTS
purpose of this Disposal
- mandatory
question Tracking
issafety
to ensure standards 1 N/A N/A N/A N/A N/A N/A
clients (operational teams) based on issues that required reported,
meeting
relevant or(Truck
safety
issues there Tare
are
requirements
that impact
and
strict Cube
and and
daily swift
quality
warehouse
related3.- Capacity
to newis
reported
Check
Manager
SKPI)
ifto (Truck
greater
DCask iswhichtracking and
thanKPI/PIs0 the
that Cube strict
number
from
Capacity
and
the swift
orfleet are
new SKPI) Example between Fleet department with its
alignment
2.2 Does the site control the preventive - Current
R2.2.1
management checklists
Location
- Maintenance is
(If
pillartracked
tools 100%
multiple
standards
used and to strict
locations)
defined
ensure and swift the 1. site does
- Current
Check
management ifLocation
there not, areverify that
(Ifmaintenance
multiple the site's
locations) standardschecklist 5
0 --- All requirements are1met Operators
The purpose should of this have communication
question is to ensure witha 1 N/A N/A N/A N/A N/A N/A
impact the results? requirements
and delivery
management are
operations
actions arebased takenon interviews
anytime percentage
the most important
completion %ofpillar
assets
for
tools
legally
are
meeting
toappliable)
therequired used
performance safety to ensure
checklists of is 3 0 - Two
Gap in requirement
Less requirements are met
than three requirements are fully met clients.
mechanics Fleet's purpose
tomaintenance
ensure THEYis to support
have thewarehouse
maintenance in each vehicle? In accordance - Telematics
R2.2.2
corrective
R1.2.4 - ActionPreventive
action Unit (ifmaintenance
and
plans appliable)
preventative
in place and plan
measures
followed defined to - Telematics
defined
corrective
requirements action Unit
and and (if
quality preventative
requirements measures and if preventative (PM) plan isresources
in place
2.3 Does the site have a inventory policy for the R2.3.1
R2.1.2
checklist - Inventory
Minimum
completion Policy
of 2 PIs
is under defined
defined andbased
100%(km/miles the on 1. Check
delivery
100% andtheandif there
warehouse. is evidence These that an
KPI/PIs Inventoryor a 5 - All requirements are met Spare
and parts
delivery management
execution while is critical
being to
safe our and lost, or stolen documents 1 N/A N/A N/A N/A N/A N/A
with the defined intervals - Documents status to be compliant with local ororPolicy
3.zone if that
requirements there strict
iscauseaisand
process swift to management
ensure that vehicles or-requirement
remain out1a not met
of service whenthe
are until applicable and executed.
proper documentation responsibility
is reestablished toishelp solve
in cases their
asofa equipment
expired,
most required spare partsand schedule?
for the fleet? based
taken
ensure
routines
deparment
R1.3.2
on
on all expected
theassets
adherent root
feedback,
cycle
cause
meet
to
checklist the safety
which
for
policy each
can and
(Spare quality
differ parts
based onon
2.
taken
it's Check
similar on
impacting
is in
KPI/PI
that place there
root
their
on and
theoperationa preventive
the
KPI routines
tree should
maintenance
adhere be to
tracked it 3
1 -
Four
One
requirements
requirement is met
met and
preventative
compliant. Fleetand This corrective
should
important
ensure maintenance
it is
thorough
monitoring plans.
2.4 Does the site control the corrective R2.4.1
R1.1.3with
time)
standards - Digital
Process
accordance
(if maintenance
applicable)defined to stores
andrecorded
local the data
followed
regulations, toinensure
with aall 1. actions
4.
plan
4. Check
that vehicles
based are
for
taken
if there
on actiontheare
remain isanytime
a digital
out
process
expected
plans of
to
checklist
maintenance
service
to ensure
cycle
close
completion
until
for
gaps each that
the proper
on 5 -documentation
vehicles All requirements
have proper up is are met documentation,
reestablished
to date in cases ofboth defects.
Corrective
expired,
from
PM This
routine
planlost,helpsor will
maintenance create
renewals
stolen
ABI faster
documents
reduce and (CM) defect
can
to check
costs bycreateresolution
for
improvingnew local requirements are followed 1 N/A N/A N/A N/A N/A N/A
site Only)
business
way to be needs
ableservice to stratify issues byorvehicle, 2.
by
type records
is Check
Fleet.
under if
100% the site has defined the desired 3 - Three requirements are met It
theis
with important
KPI/PI most to have
critical a toprocess
warehouse in place and
maintenance in each vehicle? the corrective
R1.1.4 - Data
manufacturer's
R1.2.5 Process defined
recommendation,
collected orders performed
andtelematics
followed local to
forensure
guild 5.that
Check
(km/miles vehicles with
ifor DC all have
time) isthe corrective
tracking
inproper
accordance %upOut service
to date
of
with orders
compliance
documentation,
local over time
1 - Threebothandfrom if routine
it's impacting
requirements renewals
theirand
are met operation newalocal
to check for service
asset good
level communication
impacts,
requirements
reliability and asset increase
are process.
costs,
followed
lifespan. It isand
3.0 FLEET MANAGEMENT R2.3.2
R2.1.3 - Desired
Actions days
are takenofwithstockto solve defined problemsand all assets
days
2.
2. Check ofnot stock meetingand asafety
counting andof stockquality standards
frequency around the management of spare itsparts to N/A N/A N/A N/A N/A N/A
of occurrence,
R2.4.2
R1.1.5
lines
deliverybased- assets% Out on and
Corrective of driver
maintenance
compliance
historical
and forklifts data is tracked occurrences over time, but onlyifthat
Check
performed
regulations,
(if applicable)
there
reviewedtheisdigital
manufacturer's
minimum
with checklist
management of 2
recommendation,
PIs
store defined
the
pillar datatools0 -- No
or 3 when Threerequirements
requirements
affects arearemetmet
truck availability delivery
reduce
important
departments
fleetthat life.
theIt PM
to support
is critical
plan evolves that the purpose.
DC time to
over
counting
and
R1.3.3improve of stock
The the frequency
results
checklist of the
clearly defined
PIs
identifies (Sparewith 3.
basedCheck onto ififdeparment
DC is tracking feedback, anmeeting
inventory-related
which bycan differ 1
5 -- Two requirements are met ensure
good the excellent service for Fleet's clients.to
3.1 Does the fleet team has a standard agenda R3.1.1
are
R2.2.3 - Fleet
analyzed Preventive Weekly
and Meetings
countermeasures
maintenance executedarewhat
adherent taken tois 5. in a
1.
2.
local way
Check
Check guild that
for
becorrective
the
lines able
fleet
based
telematics
to stratify
weekly onservice issues
historical orders is
data vehicle,
indataplace can All requirements are met
all 0 Less than three requirements are fully met monitors
A
address fleet weeklymaintenance
its corrective
corrective meeting
maintenance routine gaps is when
and critical
findsit 1 N/A N/A N/A N/A N/A N/A
parts
Examples on site
a critical of Only)
issue PIs (for that can 1beKPI/PI chosen based on withKPI
based chosen
ofon according
business needs tothat
impact collects on resultsdata forsuch Even if thefleet DC does not have spare parts on
that
Does include weekly
the site meetings?
control the budget of all Fleet? representatives
R2.4.3
the
R3.2.1 - Budget
preventive
- There isfrom
plan atexample
spent
warehouse,
least
throughvs
leaking
budgeta digital oil)
delivery,
such
planned tool vs
as aand
Time type
be
3.
1. stratified
Check
Check
vehicles
occurrence,
representatives
the
if
used for
there analysis
adherence
for budget
and
delivery
from driver
to the
when
spent
andthe warehouse,
needed
preventive
vs budget
forklifts in the 1 -- All
5 Tworequirements
requirements areare met
met
executing
opportunities
makes
Fleet is cost
one sense
of
processes
tothemonitor
to
most move and tointo
expensive
maintain
closethe its
PM
parts
a plan.
safe,
biggest
of N/A N/A N/A N/A N/A N/A
Yes 3.2 R2.3.3
business
minor issue Inventory-related
needs: KPI chosen as Working
3. Check
Check ifthat Capital,
actions Fleet
are taken Inventory
to solve Loss, problems or 0 - Four
Less requirements
than two requirements
are met are fully met hand it is important thatfleet.
the DC has a process 1
fleet/3rd
to Service,
R2.2.4
controlled - DC #(small
parties isoftracking
through
bodyatdamage)
Refusals Due
least to1Breakdown,
KPI/PI that delivery,
3.
maintenance and
isiffor DC the
planhaschecklist
fleet/3rd parties
atthrough
through least aclearly
1digital
KPI/PI identifies
such
tool as 3 compliant,
CM gaps. and reliable This routine should
Does the site control the total fuel consumption R3.1.2 according
- Fleet#-fulfillment
R3.3.1
R1.3.4 A
The to
localimpact
Management Fuel
checklist %routine
on
=Policyresults
total
has
cycle
review
fleet such
ischosen
evolveddefined
has
and
been asas
available/ actions
Working
based
new total planned
warehouse
Service
and
on 2.
1.
what Check is aOrders
improve controlled
critical
that results
aof Delayed
Fuel
the issue for(for
Policy
management Due
the andPIs.
example
routine
to Parts
Examples
ifcycle
Fuel review
andbeen
Policy
leaking
has DC
ofoil)# 0 5 - Less
All requirements are met ABI's
in place
Fuel
be
business.
makes
where tofleet
monitor
up aItsignificant
isand
communicates
critical
holdthat cost theto DC's
itsperformanceABI. Itfleet
suppliers is N/A N/A N/A N/A N/A N/A
3.3 and/or
can
R3.2.2be
Capital,
fleet - Fleet of
chosen Breakdowns
CostsInventory to measure
controlledLoss, are the
for fleet and
costs Orders and
or Service
monitoring
4.
can actions
demonstrate
# breakdowns,
DC
why is tracking
KPI/PI
Time
was at to
least Service,
chosen KPIs 3 1 than two requirements
- Three requirements are met are fully met R2.2.2
team Truck
has visibility
accountable Inspection
forDC their fleet spend and and
into parts.
spare Checklist.xls can 1
for all of Fleet? itemsrequired
AB-Inbev
completed
tracked are added
fuel
for
according
effectiveness/impact GOP
the toFleet
the
to what
of asset
department
their such
impacts
PM as and
its
program, 3ft
resultslasers,
critical
such PIs
of
KPI/PIathat
vs Refusals
uses
completed minor
Fuelthatcan GOP beFleet
issue
for
Due
can chosen
where
be(small
to Breakdown,
chosen based
applicable
body
department to on
damage)or
measure business
andcritical
# of the 1 - Three Requirements are met important
upcoming
R2.4.3
R2.2.3 that
routines
Corrective
Adherance reviews
with
Maintenance
to PM its good
customers,
Plan practices
and
Digital as
Breakdown for
well
Tool.ppt
3.4 Does the site have a Tire Policy? R3.4.1
impacting
Delayed - Tire DueDC's Policy
to budget
Parts defined including includes ontires
preventive 1.
2. Check ifif there
fleet is a Tire
costs Policy
impacting that
DC's includes
budget 5 - All requirements are met Tires
stratify makes
costs up for aanalysis.
significant Fleet cost teamto ABI.should It is 1 N/A N/A N/A N/A N/A N/A
- 100%
R3.3.2
back
KPIs
the
as % up
have
most -ofcameras,
Completed
the
Operators
been fleet are(Spare
required
and
defined
Preventive aware
hand parts
ready
andmeasurement,
are by
of driving
cleaning being
Maintenance,
site
6:00
stations and 2.
AM
tracked#and
4.
4.
of have
Check
needs:
Interview
Ask
Breakdowns if any
been
effectiveness/impact
management
operators
new
defined
according fleet
and of to tools
determine
requirements
being
to
theirwhat PM
are
tracked.
impactsbeing
ifhave
programs, they used
its are 3 - Three requirements are met
been fuel
as performance,
focuses
Monitoring sets identifies
action plans areas
to close of opportunity
gaps.
calibration,
maintenance,
3rd party)
- In-Service millimeter-scale
corrective maintenance, tires
including
to calibration,
improve preventive,
results millimeter-scale
corrective measurement,
maintenance, 1 - Two requirements are met important
use their cost that DC reviews
stratification manufacturer
to identify budget
MANAGE TO IMPROVE when
behaviors
R3.1.3
R2.4.4
issues applicable
-
corrected to % reduce
Maintenance
Actions are
during fuel consumption
schedule
taken to
Preventive solve for the
problemsweek is 3.- Fleet
added
awareCheck
results
such as of
infulfillment
the% driving
the
if the
most last
Completed % =DC
behaviors
years
maintenance
and total
(ex.
can
Preventivefleet
to
3schedule
reduceavailable/
ft lasers,
demonstrate fuel
Maintenance, back
for total
the
why up 0 - Less than three requirements are fully met for fuel, and takes actions to improve results. N/A N/A N/A N/A N/A N/A
wheel alignment
preventable
R2.3.4 damage if to reduce
of each tirevehicle,
consumption and and
fleetIfwheel
preventable alignment
damage to
of reduce
each tire
vehicle, and by a 1 3 - Four requirements are met standards,
gaps to track local guidelines
a KPI/PI and create or site actions
historical to
- Corrective
according
R1.3.5
monitored
and improve
maintenance, -- FleetCheck
to Maintenance
Fuel
during
results
or
management
checklistPolicy
the
oil of issues
meeting
clarity.the Adherence
selected toolsKPI/
communicatedare% being
PI 1a.
consumption
cameras,
week
KPI/PI
# of
spare
required
is
issues was hand
monitored parts
according
chosen
corrected
are
cleaning duringmaintained
to
during Fuel
stations).
the meeting
Preventive
off-site
Policy Verify or those - Two requirements are met Fleet should participate in the management
4.0 FLEET AUTONOMY & IMPROVEMENTS R3.4.2
used to--improve
penalties/fines
- Preventive Operators through perform
results
Maintenance routine
(Spare tiresreview
Adherence calibration
parts onand
%thesitefleet 3. consumption
penalties/fines
3rd party,
-maintenance.
100% ofifthat the
fleet are
3rdrequired controlled
party or
readyoff-sitethrough
by location
6:00 routine
AM 0 - Less than two requirements are fully met data
improve for tires
their management,
budget performance. identifies areas of N/A N/A N/A N/A N/A N/A
between
R3.3.3
R3.1.4 - At mechanic
Definedleast 1SLAs
KPI/PI
and operator
and related
KPI/Pi tofrom
fuel have
4. Check been added
DC
the is tracking
defined to the safety
SLAs at least
and checklist
1 why
KPI/PI
KPI/Pi when
from R3.3
cycle Fuel
annually Management.PPT
to ensure
R2.2.5
according
actions
and 3rd
Actions
to Tire are
Policytaken to solve problems 2. Check
review and ififFuel
management
DC
Operators
actions can demonstrate
are pillar
performing tools tirearethat used 1 - Three requirements are met opportunity forautonomous
tires, and that takes the most critical
actions to
4.1 ATO Formal Program & Cleaning Area - Does consumption - Help
R4.2.1
R1.3.6
pillar arein --- party)
Atraffic
Area
tracked defined
tracked
PIresults
is beingduring to
(mpg allow
tracked
meetingsby for
truck, Cleaning,
anddefined mpg by needs
- In-Service
1. Check
related
applicable.
the
to fleet
improve to share
topillar an
the%are their
area
consumption
being
performance spare
exists toparts
tracked allow
(mpg
of the policy
for
by truck,Cleaning, mpg 0 5 - Less
All requirements are met
than two requirements are fully met As part
R.3.3.3
tasks areof
Fuel our Trackingand
indentified Excel PIs operations
Dashboard.xls
are in place journey,
to 1 N/A N/A N/A N/A N/A N/A
and improve
R3.4.3
R3.2.3
R2.3.1a -Utilization
At3rd least Party/
for
standards
1 Budget-related
Off-Site
the selected
are
Inventory KPIsKPI/PI KPI/PI
calibration
tracked Inspection,
Policy 3.
2a. Check was
Checkthat
chosen
if ifaccording
DC there isLubrification
tracking
are toKPIsTireat inPolicy.
leastplace 1selected
If policy
budget- improve
R3.2.1 results.
Budget Spend vs byBudget Planned
the site have
site ahave
program in place to incentivize - Breakdowns
Inspection,
management
driver,
R3.1.5 fuel -Actions and
loss, Lubrification
pillar
fuel
are tools
consumed/case
taken are to (CIL)
being
solve utilized
sold)
problems to - Corrective
by Interview
driver, fuelandMaintenance
operator
loss, fuelto Adherence
(CIL)
consumed/case
understand iftothere
% measure
sold) is fleet should participate identifying
4.2 Does
or
the
promote blemish
a historical
free
database
performance? Is
of
there
R4.2.1
R2.2.6
according
and
(3rd
R4.2.2chosen
party
- Corrective
The
All only) PM
tooperators
the
according plan and topreventive
has
manufacturer's
have
evolved
impact
been on toresults,
manual,
properly local 5. 5. Check
KPI/PI
1. Check
calls
related
vendor
-
2. outKPIs
Preventive
Check
ifthat
check
adherence
if
all
all that
actions
corrective
actions
during
Maintenance
operators can to
are
are
be
taken
and
taken
operator
on-timechosen
have Adherence
to
preventive solve
toaccording
solve
checklist,
arrival
been for
properly % watch
spare to 5
0 --- All
3 Less
Four
requirements are met
than two requirements
requirements are met are fully met track,
Fleet close gaps,
R3.2.1Management
maintenance Example gaps
and
Excel
generate
Software
causingDashboard (FMS)
safety,
improvement.
is critical to
quality, 1 N/A N/A N/A N/A N/A N/A
maintenance done in each vehicle? R3.3.4
ensure
and improve
proactively
maintenances - Actions
quality results
solve are
checklists
performed taken
for the
reoccurring are
areto solve
being
SLAs,
corrective
managed problems
completed
KPIs, and and
through DC can
communication
PIs maintenances
problems demonstrate
and between
improve
performed why KPI
mechanic
results was
forper thechosen.
and SLAs,
4.3 How
a is DCarea
specific promoting Future
of the site With
where operators regulations,
such
More can trained
R4.3.1
R2.3.2a as-on Cost
-Front
KPIs or
their persite
Line
defined
roles historical
Assets,
employees
& to Total data.
measure
responsibilities Fleet
are awareCosts,
vendor with AB the checklist
impact
1. Interview
parts
- Help
trained (3d on
in
on process
results,
party
traffic Front
their only)
roles to
such
Line ensure
& asare Cost
Employees managed
compliance.
responsibilities to KPI/PI
Assets,
see through
with if they
the 5 - All requirements are met having
The goal
production,
a word
of this
or
class
costquestion fleet is
gaps
operation
using to make as
historical sureit allows
1 N/A N/A N/A N/A N/A N/A
(example:
and improve
reviewed
an electronic in# theof
results
issues
systemmeeting of found
the KPI-related
(Fleet selected
from checklist
management KPI/PI vs operator
4. Check
KPIs,
an andto
electronic thatPIssolve actions
reviewed
system fleetutilization
are
checklist
intaken
the meeting issues
to solve R3.1.1 Fleet Weekly Meeting andTOR
Cheers?
perform Cleaning, Inspection, and Lubrication InBev
maintenance
R3.4.4
Cost
adherence
CIL or- of
YoY Tire
Zone issues
toconsumption
on-time during
Sustainability arrival preventive
for
Goals spare tracked
or Targets
parts (3d areselected
3. Check
Total Fleetifand
Aware
- Breakdowns
CIL
problems
there
Costs,
of AB improve
are and(Fleet
InBev/Zone Cost Management
YoY. standards
DCselected
Sustainability can 3 - Two requirements are met
1 - Three requirements are met
for streamlined
frontline
maintenance employees
processes
data. are aware
fleet data
of what ABI is
number
maintenance
software).
and chosen preventable
when
according breakdowns)
applicable
to impact on results, 6.
6. Check
Software).
Check
according that
thattothe thethere
their PMis aresults
manufacturer's PI being
plan has of evolved
the
tracked
manual, to
to
local R3.1.2 Fleet
tracking/visibility. Management Cycle
R3.2.4
R4.3.2 Actions
-- KPI/PI are taken intoplacesolve problems demonstrate why KPI haswas chosen.
of their equipment? party
R4.2.3
R1.3.7
R4.2.2
only) Formal is to
A PIPressure,
- Tire
Management beingtrack
program chosen
tracked and based
to on their Goals
recognize,
management 3. Check
KPI/PI
ensure orquality
Targets
ifif the site
checklists a are
formal being programcompleted in to 3 - Two requirements are met doing locally, nationally, or internationally as
such
and
impact ason
improve orresults
sustainability of tools
Tire
the used
Measurement,
selected
(examples
to analyze
budget
HL/Liter Tire
KPIthe regulations,
of 2.
2.
4. Check
proactively
Check ifthat solve site
oractions
site uses
reoccurring aremanagement
historical taken corrective
data. to otherwise
solve tools 1 - One requirement is met
incentivize,
pillar tools
historical
Spend, or are
database
Premature
otherwise
beingand utilized
Tire
promote
find to reduce
root
Failure.
blemish
causes toor to their
impact place
(example:
maintenance
analyze
4. Check
to the
if #DC
recognize,
DCofissues has
issues
historical
is
chosen
incentivize,
tracking found
during
database at
afromKPI/PI
preventive
least
or
and
to trackvs
checklist
one find KPI root such
0 - Less than three requirements are fully met part Fleet
A
ofteam
world
theirshould
class DC
sustainabilityuse this
should
efforts.
information
leverage
The DC
their in a
Fleet
CO2 for
incident-free Warehouse operation and or
ofreduce Delivery,
equipment Trash
in all fleet problems
promote impact and
blemish on improve
sustainability
orSLAs results
incident-free of
(examplesthe
operation selected HL/Liter
of 1 - One requirement is met should engage
workstation toSoftware in local
upskill the efforts
frontline to help support
to participate
operations
improve
R3.4.5 SLAs,
-Based due
Actions to time
KPIs, orto repair issues
costs found
annually on as
number
causes
maintenance of
to preventable
improve when breakdowns)
applicable or reduce costs 0 - No requirements are met Management data to improve their
Produced,
R4.2.4
checklist
(at a minimum). orWaterotheronare DC
PI of
taken
Consumption,
analysis
related
to solve
to of etc.) problems
maintenance
checklist issue
budget
of
7. C02
Tire for
equipment
Check
annually
Pressure,
KPI
that
(at
Warehouse
all
a fleet.
there
minimum).
Tire
is Tire
Measurement,
aand or Delivery,
PI Failure.
being tracked
Tire Trash
and ABIs broader
in solving
operation. fleetgoals,gaps track through their progress and
cleaning,
and
R4.3.3
data, improve
at-- least Local results
actions
1pyramid
KPI time or PI the
defined selected
is repair)
identified KPI/
and executed PI
andmostto 3. Spend,
Produced,
4. or
Check ifif Water Premature
DCpillar has Consumption,
completed etc.)DC can 0 - No requirements are met take actions or to maintenance
improve.
closeout
R4.2.3 (example:
Fleet to
created showing management
Check
demonstrate the why fleet KPI
tools
pyramid
was
are being is an
chosen.
analysis
in balanceutilized to of inspections, as permitted by
improve
trackedfleet tosustainability
improve KPIs ATO such as # of 3. Check if DC to has shown andlocal dueactions to
critical defectsthrough at the top (breakdowns) their
reduce
where maintenance
impact
more issues data
operations
are resolved has identified
to timeand
highest toand
to legal and
Review ofsafety
the fleet guidelines.
pyramid will Theallowgoal is you to to
Blemishes,
and least critical # of ATO at the Tasksbottom Completed,
(preventative and/or 5. is Actions
improve
tracking
repair
lowest issues
from
their are taken
sustainability
atpreventive
least
found 1on to solve
KPI or KPI
checklist PIproblems
maintenance, that or they
other fleetare
PI leverage ourthe
understand frontline
qualitytoofhelp yourus prevent and
preventative
Time Saved tracked improve results ofthrough
the selected KPI/ PI
maintenace). Results(Example: are trackednumber overtime of and checklist,
trying
relatedtotoimprove checklist
corrective ormaintenance,
other ATO such
PI related toasto# of solve fleet gaps
maintenance while simultaneously
program and put action plan providingin
hydraulic
actions takenleakstofound) identify and reduce root causes breakdowns. Blemishes,
checklist issue # Results
ofcloseout
ATO Tasks are(exampke: Completed,
tracked time and
overtime to and an upskilling
place to improve opportunity
fleet reliabilityfor our through
teams. planned
R4.2.5
of corrective - Actions are taken by
maintenance to solve
improving problems Time
repair)Saved
actions takenif to it'sidentify
impacting andthe reduce results coot maintenance vs unplanned maintenance.
and improve
preventative maintenance plan. results of the selected KPI/ PI (Example: number
causes of corrective maintenance by improving of hydraulic leaks is tracked 4.1 Autonomous Operations in Fleet
R4.2.6 - Operators execute deep clean process due to most requent
preventative maintenance breakdown plan. of forklifts) 4.1
R4.2.3Criticality
Fleet Pyramid Matrix w/Guidance SOP
according to local frequency and defined 5. Check that actions are taken to solve
standards problems and improve results of the selected
KPI/PI
6. Check is there is a deep clean process and if
it is executed at a defined frequency and to
defined standards
DDC

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Questionnaire - Safety Pillar 85%
Reporting Period: Targets : 85% 80% Mandatory: 1
Facility Name: 80%

Question WH - WH DEL - DL
Mandatory ID Question/Topic Requirement How to Check Scoring Guidance DC Comments & doubts Global Owner Feedback WH - DDC WH - ABI DEL - DDC DEL - ABI DDC
Weight 3PL 3PL
SAFETY PILLAR N/A N/A N/A N/A N/A N/A N/A
FUNDAMENTALS N/A N/A N/A N/A N/A N/A N/A
1.0 SIF & INCIDENT MANAGEMENT N/A N/A N/A N/A N/A N/A N/A
Yes 1.1 Incident Reporting R1.1.1 - 100% of incidents including Near Miss, 1. Check incident reporting tool for potential 5 - 100% of incidents are reported and Purpose: entering all data into the global tool 1 N/A N/A N/A N/A N/A N/A N/A
1.2 Incident Notification First Aid- 24
R1.2.1 incidents, and Total email
Hour Notification Recordable sent within 1. gaps Check in reporting.
for record of 24 Hour Notification documented
5 - All requirements in the Global
met forIncident
100% of applicable Purpose: allows us 24 to perform data analysis
Hour notifications are at variousto
intended 1 N/A N/A N/A N/A N/A N/A N/A
Incident
24 hours properly
for every documented
LTI, MDI, MTI in the
andGlobal
SIF Management System. levels (site, region, zone, site,global). Itand
ensures
1.3 Incident Investigation and Root Cause Analysis R1.3.1
Incidentand - Reporting Root cause toolanalysis
(no gaps). for every incident. email.
1. Check incident reporting tool and review the cases 5 - All requirements met for 100% of applicable immediately Purpose:
visibility and Wenotify must the
accountabilityidentify aregioncause
torootour
zone
performance. for of 1 N/A N/A N/A N/A N/A N/A N/A
Actual SIF Potential. 2. Check Incident management tool, ensure incidents which have occurred. This allows us
R1.3.2 --5Incidents Why or otherintegrated management system root causeif analysis (Check if the documented as the first 5 5 cases
3 -- All Evidence every incident so thatto we can create corrective
1.4 Incident Management Routine Review Process R1.4.1
R1.2.2 - Completedare investigation for intoevery
routine LTI 1. that Check
investigation incidents fields areare reviewed
completed. 3 R1.2.1 andsuggests
requirements R1.2.2 met anand
met isolated
forKPI/PI
100% gapof in Refer
Purpose:
to to the
respond isIncident
it quickly
critical and Reporting
review
implement andindividual
the SIF
corrective 1 N/A N/A N/A N/A N/A N/A N/A
tool documented
review process atfor all every
levels investigation. Why in is daily
uploaded andmeetings,
if it is of good quality). reporting (1cases case). actions
Management which will
global prevent
protocols thedetails
recurrence
for additional of that
2.0 HIGH RISK PROCESS MANAGEMENT MDI, MTI and SIF within the(Incident
Global Incident notification item 3. Check theroutine audit tab to verifyshift timeliness handover, of demonstrating
applicable improvement
BUT R1.2.3 met for <100% of incidents actions which
across happen,
locations. the
Sharing of of those
safety N/A N/A N/A N/A N/A N/A N/A
R1.3.3 - Corrective
evidenced in team actionshandover
rooms, - must be more 2. Check incidentand reporting toolinand review 3 - R1.3.1 AND R1.3.2 AND R1.3.3 met for incident.
guidance. Root cause causeanalysis the should be done
Management System within 7 days. meetings, weekly investigation meetings and that covered it is closed an within effective 7 days. applicable cases cases,
alerts atthe
theroot conclusion and of our individual
investigation
2.1 Oxygen Deficient Environment Monitoring & than
R2.1.1 1 corrective action. performed in corrective actions. Check if tothere seeare multiple are 100% 1 - All of cases
Evidene BUT met
suggests R1.3.4 met forgap
a contained <100%
in of using problem solving methodology and the
management
R1.2.3 -- Safety Facility risk
meetings,
Alert assessmentetc). and
published 1.
4. Review
way to drive
Check for risk assessment
safety
record behavior/raise
of Safety Alert ifbeing
areas 5
3 requirements Refer
actions.
ensures to Itthat
the is High
equally
the full Risk as Process
important
information Management
to reivew
from a case is 1 N/A N/A N/A N/A N/A N/A N/A
R1.3.4 to-- identify Evidence of corrective action actions, that theyaction. relate to the root cause and applicable reporting cases
(<3 corrective actions must be managedwhat to oxygen
2.2
Management
Ammonia System Monitoring & Management
order
R1.4.2
communicated
R2.2.1 - Facility Trend analysis foroxygen-deficient
risk every
assessmentof
SIF incident
Actual areas.
and
androot
performed SIF in 1. identified.
awareness/take
communicated
Review for every SIFtoActual
risk assessment see if and
areas SIF that 5 1 -- All R1.2.1 metcases).
requirements for 100%
met of applicable cases
global
trends
cascaded
Refer
protocol
toofthe
what
and High isforcausing
that more
complete
Risk
information
Processincidents,
learnings
Management
on aretypes 1 N/A N/A N/A N/A N/A N/A N/A
management.
R2.1.2 - Potentially oxygen-deficient areas that
2. the actions
Check Incident. are
if there is a monitoring more than simply
andfor retraining. 3 - R2.1.1, R2.1.2 completionh. Refer to the Incident Reporting
cause
Potential
order
R1.3.5 todata
- identify Risk
available.
incident within
areas that7 days.
utilize performed
ammonia in 1. Potential
utilize ammonia are action trend analysis
identified. 1
BUT R1.4.1
R1.2.2 AND forAND
metR1.4.2 <100% R2.1.3
met met BUT R2.1.4
of applicable deficient
of
cases global injuries
possible environment
are occuring,
across
protocol ourmore
for
monitoring.
sites. etc. ReferThistoanalysis
information the will
onIncident
Yes 2.3 Explosion Prevention Monitoring & Management R2.3.1
R1.4.3 -- Facility
equipped withAssessment
Strategic risk
detection
focusassessment update.
system
area and/or
identification for 2.
3. Check
Review
management
incidents
corrective
and riskprograms
assessment
root and log to verify
todetection
see if areas actions
system within 5 1
0
not -- All R1.3.1
Evidence
met AND
requirements R1.3.3
suggests metamet for 100%gap
systematic of cases
in and
Refer SIFto Management
the High SIFRisk
global
Process protocols
Management for 1 N/A N/A N/A N/A N/A N/A N/A
system. areCheck
closedif in there a timely iscauses
a monitoring
manner.
are identified.
and 3
BUT - R2.2.1,
reporting R1.3.2 R2.2.2
(>3 met forAND <100% R2.2.3 met BUT R2.2.4 global
of cases
empower
Reporting
Ammonia
additional
the
and
Systems site
guidance.
toManagement
select
Monitoring corrective
and global actions
Yes 2.4 Electrical Systems Management order
Monitoring
R2.4.1
R2.2.2
to- identify
the facility. No and
Ammonia
areasviolations
management
electrical with potential
installations equipped
programs
observed of in -
with 1.
potential
Check of
place.
3. Review
management
4. Check
Check ifthe
explosion
iffacility
strategic
programs
facility andfocus are Identified.
check and areasthe
detection are identified
condition system of in 5 0 -- All
not R1.4.1
R1.2.1
met metcases).
not
requirementsmet
for <100%
met with of applicable
no violations cases Refer which
protocols protocol
have
to
Management. theforthe for
power
additional
High more
Risk to information
impactManagement
guidance.
Process multiple on injuries 1 N/A N/A N/A N/A N/A N/A N/A
explosion.
place.
Electrical systems/equipment maintained 2.
3.
for the facility. there arearisk
is controls assessment
monitoring and and
in(electrical
place. 3
1 - R2.3.1, R2.1.1 AND R2.3.2 ANDmet
R2.1.2 R2.3.3 met BUT R2.3.4 Explosion and willprotocol
help Prevention
theforsite toMonitoring
prioritize andwhich
on
3.0 WORKPLACE TRANSPORT SAFETY detection
R2.3.2 - system
Areas with and/or
potential Monitoring of and in
explosion
electrical
place.
validate
management
systems/equipments
that itprograms
is updated and as detection
a resultthese ofsystem the rootin not
0 - R1.3.1 met OR R1.3.3 met for <100% of cases global Management.
more information on N/A N/A N/A N/A N/A N/A N/A
R2.1.3
good conditionprograms
management Controls are in
and safe.in place. place for potentially 4. Talk
conduits,
3. to
Check ifmissing operators
there are and
outlet controls ask
covers, about panel covers
in place. areas 3
1 - R2.4.3 R2.2.1 met ANDAND R2.2.2 1 violation
met of R2.4.1 or actions must be
Electrical Systems Management. taken first. Refer to the Incident
equipped
oxygen-deficient with detection areas. system and/or cause.
place.
and if they follow theand intervention
3.1 Traffic Plan Management R3.1.1
R2.2.3 -- Traffic
R2.4.2 Electrical
Controls Plan work
are implemented.
in permits
place forcompleted. areas that 1.
4. Review
not secured,
Talk the
to operators traffic
exposed plan wiring,
ask etc).routines.
established
about these by the areas 5 0
R2.4.2-- All R2.1.1 not met met
requirements Reportingtoand
Purpose: defineSIF the Management
traffic flowglobal and controls 1 N/A N/A N/A N/A N/A N/A N/A
Monitoring
R2.1.4
R3.1.2 --- Layout When and amanagement
detection
featuring thesystemprograms
Traffic isPlan
used inisit is site.
3. Review
Check ifwork therepermits are controls in place.check if it 1 - R2.3.1 AND R2.3.2 not met protocols the for additional guidance.
3.2 Loading & Unloading Safe Execution R2.4.3
utilize ammonia.
R3.2.1 All electrical
Loading/Unloading works completed
procedure by
written, 2.
and
1. if they the
Review follow the intervention
load/unload andprocess: projects, routines.
checkareas if it is 50 -- All R2.2.1 not met met AND improving trend in within
requirements Purpose: facility
a wrtitten andprocess
the yardforand to visually
loading and 1 N/A N/A N/A N/A N/A N/A N/A
place.
inspected
posted by accessible
the operators with routine 4. completed.
Talk to ifoperators and ask about these
R2.2.4 -inWhen
qualified
complete an
employee+14:17s.
and a detection
available area. system is used it is 2. is Check the layout with traffic plan is posted 3 1 - R3.1.1,
R2.4.3 met R3.1.2AND AND2-3 R3.1.4 met
total violations of communicate that beto all emplolyees. The traffic
3.3 Powered Industrial Equipment Safe Execution R2.3.3 -- Safe
intervention
R3.3.1
R3.1.3 Controls
Operatorsdocumented
operatingare aware in to placeemployees.
ofwith thefortraffic
appropriately.
rules for areasplan.
powered with documented
and
1.
in
3. if they
Watch
areas
Check the
where
if there
in
followPIT a SOP.
the intervention
operation:
people
is any can
electrical checkwork
access. routines.
if drivers are 5 coaching/OWD
0 -- All
R2.4.1or R2.3.1 not met
requirements
R2.4.2
results
met AND improving trend in Purpose: unloadingtomust
plan should ensure be usedthat
available
as aequipment
to employees.
problem solving is operated 1 N/A N/A N/A N/A N/A N/A N/A
inspected
R3.2.2 - Loading/Unloading by the operators Process routine well 2. Watch the load/unload process: checkspeed if the coaching/OWD results Adherence toour thisoperations.
process must beoperating
maintained
potential
equipment
R3.1.4 - Engineering of followed
explosion.
Sufficient bycontrols
signage drivers of safety(using horns,
rules operating
3. Talk to operators
completed safely
by - using
unqualified to horns,
ensure workers. following
that they are 1 -- Pedestrian
R3.1.1 and interaction
R3.1.2 meteliminated through safelly
visual, andwithin updated when new Saferisks are
Yes 3.4 Pedestrian Safety Management intervention
R3.4.1
executed
R2.3.4 - in - documented
(Tiresaare
When appropriately.
choked/secured,
detection in
system is usedplace to
keys itare 1. Review
process
is limits, the traffic
is executedintersections plan/systems
as it is documented implemented 5
(check 3 All requirements met BUT coaching/OWD Purpose: We
through our should must
OWD and eliminate pedestrian
coachinginroutines. A 1 N/A N/A N/A N/A N/A N/A N/A
following
outlined
eliminate speed
trafficlimits,
potential plan.
pedestrianapproaching interaction. aware
on the approaching
and
floor: can Check theyifreference
there are with caution,
details
engineering of the 0 - R2.4.3
engineering not met OR
controls >3 total violations of procedures
identified. Refer
interaction in our be outlined
towarehouses
the Workplace and aTransport
writtenThis
yards.
3.5 Powered Industrial Equipment Pre Use controlled
inspected
R3.5.1 - Process , vehicle
by with
the operators
in operators
place to with are
assess free
routine from
powered If
balls, 1. the truck
Check ifmirror is secured
there is a documented using chocks and
pre use key results
5 -- All not showing
requirements improvement trend control which physically prevents the vehicle
intersections caution, checking mirror checking
plan.
controls in processplaceballs, that respecting
make separation 3
0
R2.4.1 R3.1.1 not met met AND
or R2.4.2 improving trend in Purpose:
BUT coaching/OWD procedure
Safety global weand must define
availale
protocol the
topedestirans
for process
employess.
more information. for 1 N/A N/A N/A N/A N/A N/A N/A
Inspection Safe Execution interaction
interventionseparation
equipment.
respecting and FLT operators
documented requirements, integrated).
appropriately. vehicles control).
inspection
requirement, vehicle in place.it signage
properly
nearly
disabled. coaching/OWD
results not showing results
improvement trend
includes
from being
completing
Adherence
interaction
able
prethese to move
shift with
inspectionsis the most of our that
robust
powered
Yes 3.6 Key Control Safe Execution R3.6.1
R3.2.3 --- FLT Key Control
operators process written, complete 4. Check
1. Check the
impossible/hard if there Key tois bypass
sufficient
iscontrol process
(Check inif placeto support
pedestrian and if 5 1 -- All
3 requirements
Pedestrian and interationmet AND improving
controlled withnot trend
some metin Purpose:
occurs ofwhen wetomustsomeone procedures
define was theon ashoudl
process powered forbe and 1 N/A N/A N/A N/A N/A N/A N/A
R3.5.2
properly Critical
disabled). pre useare fully
inspection in control
elements of 3.
2.
the
Check
Talk
Check
safety to ifthe there
operators
rules Global ato
outlined
potential
ensure
Incident inprocess.
the
for the
that
Management
overall they truck are to
traffic
R3.2.1 R3.2.3 met BUT R3.2.2 style
industrial
maintained control.
equipment,
through A gladhand
ourprovide
OWD lockthose
and is aprocedures
simple
coaching
and available to employees. there
interaction are visible
is ELIMINATEDgaps oncheck wherever Talk possible. toin coaching/OWD
egineering results
controls BUT mainly through controlling
industrial keys/
equipment access and totheyvehicles
disembarked toprevents
prevent
3.7 Overhead Door Management load/unload
R3.7.1
identified. -
R3.3.2 -- Operators All operation.
dock
Annual driver doors maintained
reviews in
completed good move,
1. Observe
knowledgeabletruck driver,
Dock about or
doors: FLT
critical driver
a SIFelements if to
they be injured.
are and that 3 (a
5 - SIF
All Potential
requirements or SIF
met Actual
AND
BUT related
all actions
notcoaching/OWD
to R3.2.2
current inexpensive
Refer
to to
our teamsthe control
Workplace
and to ensure
which phsycially
Transport
adherance to thosefora
Safety global 1 N/A N/A N/A N/A N/A N/A N/A
R3.6.2
R3.2.4 executing key control inand good System-
plan.
operators
Check has
if there there
to ensure been
that
are significant they arePotential
barricades understand or
in SIF 1 - R3.3.2 met controls
administrative BUT R3.3.1 met (a SIF routines.
unexpected
any
truckreason.
Refer movement.
If there thewill Workplace
These
be Transport
procedures
pedestrian access must
to
conditions
R3.5.3
documented. --- Equipment Completed
and compliant coaching
is taken outto of
toimplemented.
protocol. ensure
service if 4.
they Check
Actual condition.
are the
not Global
operated Incident
if critical Management
elements are has occurred)
not from
results - AllPreventative
notorshowing Maintenace
improvement Routine
trend protocolfrom
procedures formoving
more
using during
information.
our OWD loading or unloading.
andinformation.
coaching
3.8 Workplace Transport Safety Dashboard R3.8.1
adherence
operators
R3.7.2
deficiencies - Fall
Safetytoarrest
conduct
are
the dashboard
process.
notedloading/unloading
system in place
and corrected indoortois
orprior
1.
key
placeReview
System-
2.
in Check
proper torelated
control prevent
has the
if they
working
to employees
WTS
process.
there
safe
are been
operating
toolkit:
designed
order. a SIF check
from rulesif it is
being
toPotential
fail open
not being
hit being
ororin SIFis 3
Potential
5 SIF Actual
requirements metrelated
AND to R3.3.1
toolkit
BUT coaching/OWD has
is 100% Safety
Refer
be
a
Refer toglobal
to the
available
portion
routines. of our
the
Refer
toprotocol
global the
Workplace
to
team
operation, forand
Forklift more
Safety
wewe
Transport
the Workplace must toolkit
must
Safety
Transport
within
ensure
implement global 1 N/A N/A N/A N/A N/A N/A N/A
R3.3.3
R3.6.3 -- Completed
R3.8.2 WTS
Completed toolkit coaching
completed
coaching to ensure
ensure 80%). followed?
to (above utilized
2. Check when parked necessary.
vehicles tocloseseerules ifon keys in occurred) through the Logistics Transformation portal to complete
4.0 MATERIAL HANDLING AND ERGONOMICS adherence
designed
next use. to tofailthe procedure.
open. walkways.
Actual
there
3. Check a related
potential
if Check
there to to isif FLT/Equipment
safe theoperating
fail transition
and areas an notare
deficiencies arebeing results
1
0 -- All
3
1 R3.2.1 not OR
Pedestrian showing
requirements
R3.5.1, R3.5.2
improvement
interation
R3.2.3 met
and not controlled
met <100%
BUT
R3.5.3 met
trend
only
BUT actions
R3.5.4
adherence
engineering
protocol
Safety forto
global
the process
controls
moreprotocol tofor
information. through
separate
more
our
those
information.
OWD N/A N/A N/A N/A N/A N/A N/A
operators
R3.8.3 operate powered industrial trucks in Review the annual review documentation.
operators
R3.2.5
R3.7.3
R3.5.4 -- Documentation
-
Controls
executeinkey
Management
Preventative
place control
conductsto drive
Maintenance
of
in OWD
Inspections
safety
adherence to
Routine to 2.
in placeCheck
protected
followed?
operator.
and if
andifby
they
it barricades
are
is completed.
controlled
corrected
(check toprior if it is possible
prevent to next FLT use. from for 3 current
not
- All requirements
adminstrative met from measuresmet
Preventative Maintenace Routine
this.
and coaching
pedestrians fromroutines.
powered Refer to the Workplace
equipment. We must
4.1 Manual Material Handling Safe Execution accordance
R4.1.1
improvements. - Safe with
lifting safe operating
practices rules.
implemented 4.
1.
3. Check the
if the facility
controls operators
key). are coaching are
in place log
applying - check safe if 0
5 - R3.3.2
All not
requirementsmet meet AND 0 injuries related Purpose: to ensure that proper lifting 1 N/A N/A N/A N/A N/A N/A N/A
the procedure.
loading/unloading
place.
available for allmaterial
FLT, procedures.
walkies andOWD pallet
you
5. Check
3.
to take
entering).
Check ifthe
a facility
there ison acoaching
Preventative logtoand drive
- Maintenance
check safety
if if 1 - R3.6.1 met BUT R3.6.2 not met (a SIF Transport
also ensure Safety
that unlike globaltypes protocol for more are
of equipment
4.2 Mechanical Lifting Equipment and Racking
R3.3.4
during
R3.6.4 manual
R4.2.1
-- Management
- Documented Management conducts
handling
conducts
annual as
OWD
inspections tojacks
to
defined key 4.
there
1.
there
Review
forinall lifting
Review
is
improvements.
3. Check coaching
practicesthe
is coaching
inspection
annual Globalduring documents
powered
manualdocuments
Incident
inspection
on loading/unloading
industrial
material
Management check truck
handling
for
(positive
to
0 ---manual
1
Potential
5 R3.8.1 ormaterial
BUT
Uncontrolled
All SIF R3.8.2
requirements handling
Actual
pedestrian
met below
related 80%
to R3.6.2inhas
interaction the techniques
information.
never allowed
Purpose: toand toworkstation
ensure interact
that lifting withconfiguration
one
equipmentanother. are in
is 1 N/A N/A N/A N/A N/A N/A N/A
andprotocol.
powered
the maintained industrial according
trucks intoaccordance protocol. with Routine
they
safe
as are
operating
defined in place.
available.in there
the rules (positive
protocol. and corrective). 1
0 R3.7.1
R3.5.1, met
R3.5.2BUT ORR3.7.3
R3.5.3 not met
not met
Yes 4.3 Management
Mechanical Lifting Equipment Safe Execution
control
lifting equipment.
R4.3.1
procedures.
Lifting rules. Equipment procedures written, 1.
System-
both
and lifting has
corrective).
Check ifthe equipment
thefacility
been
liftingOWDs and
equipment
a SIFracking- Potential checkorififSIF
procedures the
are 5
occurred)
warehouse
-- All or yard met AND improving trend in place
requirements Refer to to prevent
appropriately
Purpose: the Workplace injury. Refer
inspected
to Ergonomic
ensure Transport
and
thatglobal
to the
liftingmaintained.
equipment
Material
Safety global
This
R3.5.5
safe
R4.1.2
R4.2.2
operating --- Workstation Completed
Action logpowered
coaching
to evaluated
complete
towithensure adequate
any issues
5.
2. Observe
Actual related to safecoaching
isWorkstations operating toa-evaluatelogrules
check - check
if ifthere
not they are
being are 3
0 R4.1.2,
R3.8.1 R4.1.3
not met met AND4.2.7no more met than 1 Handling
protocol &
for more information. protocol for isis 1 N/A N/A N/A N/A N/A N/A N/A
5.0 HAZARDOUS SUBSTANCES
complete
operators
ergonomic and
operate available
controls/solutions to employees.
industrial
identified. trucksas inspection
6. Check
in written,
there
diagnostics
compliant
followed?
the
is complete
coaching
with
completed
facility
being onOWDs
and
performed
ergonomic
by
available
pre-inspection qualified
- check
on to
controls powered
defined
party
ifprocess
employees. in
per 3
0 -- All
coaching/OWD
injury
0 -
requirements
R3.7.1
related
R3.6.1
nottomet
not
except
results
manual material handling
met
also ensures
properly
additionalused
that
guidance.
racking
following within
a written the facility
procedure that
N/A N/A N/A N/A N/A N/A N/A
found
R4.3.2 in- annual inspection. local legaland
diagnostics requirements.
are being performed on properly inspected, maintained and used. Refer
accordance
R4.1.3 - Operators Action withplan executing
pre-inspection
to close gaps lifting inequipment 2.
process. Watch
(positive
industrial
facility/area
4. Check
operators
truck
the riskcorrective).
safe
facility
using
operating
assessment
coachingfor
lifting equipment:
rules.
- log
designed- check forif and 1
is available to employees. Compliance to the
Yes 5.1 LPG Fueling Safe Execution R4.2.3
R5.1.1 Documented
- LPG fueling quarterly
included inspections
facilitytoriskfor all 2.
in OWD 6. Review
loading/unloading
1. Review quarterly
Risk inspection
procedures.
assessment documents
LPG are for
if station are 5 - R4.2.1, R4.2.3, R4.2.4, R4.2.6 AND R4.2.8 to the to
Material Handling & Ergonomic global
in adherence
R3.5.6
workstation Management to
ergonomic the procedure. conducts
controls. check
green
thereCheck if the
iszone, the
coaching
lifting
facility
antifatigue equipment
onOWDs key mats, process
- check
control minimization
(positive there of
and 1 -- All
3 requirements
R4.1.2 met BUT R4.1.3met AND BUT improving
notcoaching/OWD
on track OR trend>1in Refer
protocol the Hazardous
must be maintained Substances throughglobal our OWD 1 N/A N/A N/A N/A N/A N/A N/A
racking.
assessment. within racking-
observe ensure
area. that the in internal team but
coaching/OWD R4.2.2 OR R4.2.5 not current trend protocol for additional guidance.
Yes 5.2 Battery Charging Safe Execution R4.3.3
powered
R5.2.1 -- Battery Completed
industrial charging coaching
trucks in
process to ensure
accordance included adhered
diagnostics
repetitive
1. Review
corrective).
bymotions.
Riskoperators
being performed
assessment a safe onmanner
for pre-inspection
battery charging 5 results
injury - All related to results
not showing
requirements manualimprovement
met material handlingtrend in Refer
AND improving protocol to for
and coaching the more Hazardous information
routines. Refer
Substances on
to the LPG Fueling
Material
global 1 N/A N/A N/A N/A N/A N/A N/A
R4.2.4
R5.1.2 Documented
- LPG bulk annual
filling
lifting stations inspections
procedures for all completing
2. Check ifthe is
LPG qualifiedbulk to
filling do so
stations
operators
pre-inspection
facility risk execute process.
assessment. equipment in according
process.
3. Check
station and toobserve
ABI
incident safety protocol.
reporting
area tool if-procedures
check if coaching/OWD results Safe
Handling
protocolExecution.
& Ergonomic global on protocol for
Yes 5.3 Diesel / Gasoline Safe Execution racking.
R5.3.1
defined
adherence -and Diesel/gasoline
toposted
thecharging in filling
procedure. filling area.process included 1. 5.
3.
are
3.
Check
Check
Review ifthe
defined/posted.
Check there
Risk facility areOWDs
assessment findings -forcheck
in diesel/gasoline
the annual 0
5
3 R4.2.1,
- All R4.2.3,
requirements BUTR4.2.4,
met AND BUTR4.2.6metOR
improving
notcoaching/OWD R4.2.8
trend in Refer to for
the more
Hazardous information Substances Battery global 1 N/A N/A N/A N/A N/A N/A N/A
R5.2.2
R4.2.5 - Battery stations procedures there
2. Check
diagnosticsare ifthe injuries Global
Battery
are related
being
Incident
charging
performedto manual Management
stations onbeingmaterial
keygaps control
1
0 -- R4.3.1 R4.1.2 met
metnotornot met R4.3.2 (a SIF additional
Charging guidance.
Safe Execution.
5.4 Compresed Gas Cylinder Storage and
in facility
R5.1.3
R4.3.4
R5.4.1 -Action Management log tofilling
risk assessment.
LPG bulk complete stations
conducts any issues
procedures
OWD as
to lifting inspections,
station
3. Check
System- and ifCheck
has safereview
observe
there work action
beenarea.
practicesa logSIF to areclose
Potential theortoSIF results
and coaching/OWD
not
Potential SIF results
showing improvement
Actual
metrelated trend trend
to R4.3.2 has in protocol for more information on Diesel and
found in-- quarterly
defined/posted.
R5.3.2
Compressed
Diesel/gasoline and gas annual cylindersinspections.stored handling.
1. Observe
procedures
procedures.
check ifis are
ifrelated
itas storage
current. if there
areas:
defined/posted is an
observe action ifplan 5
3 - All requirements AND improving
BUT coaching/OWD Refer to the Hazardous Substances global 1 N/A N/A N/A N/A N/A N/A N/A
Transportation Safe Execution followed
equipment
properly
R5.2.3 --and byprocedures.
as
Battery operators.
defined in thestation protocol. procedures 2. Check
followed
Actual
compressed
close gaps.
diesel/gasoline
defined
gas towork safe inpractices
cylinders the protocol.
operating station
are rules
stored procedures
not
as being occurred) coaching/OWD results Gasoline
protocol for Safe more Execution.
information on Compresses
5.5 Hazardous Substance Storage R4.2.6
R5.5.1
defined
R5.1.4 - Pre
Hazardous usecharging
posted
Controlled inspection
in
access the stations
substances process
filling
to the area.procedures
properly
LPG in station.
place.
stored 1. 3.
4.
are
4.
Check
Talk
Observe to ififoperators:
defined/posted.
Check
followed?
safe
chemical
access is check
storage
controlled that areas:are
they
as
being
Check
can in
defined if results
5
3
1 -- All
R5.1.1,
not showing
requirements
R5.1.2,
improvement
met BUT
R5.1.4,
trend
coaching/OWD
R5.1.5 AND R5.1.6 Refer to the Hazardous Substances global 1 N/A N/A N/A N/A N/A N/A N/A
R5.4.2
followed - Compressed
by operators. gas cylinders maintained defined
followed inas the protocol.
defined inpractices
theon protocol. Gas Cylinder storage and transportation.
R4.2.7
in secondary
R5.3.3 Operators containment. aware about critical points 1. explain
the chemicals
risk the pre are use stored
inspection secondary
process. protocol to for
the more information on Hazardous
5.6 SDS Management good---condition.
R5.1.5
R5.6.1
in
R5.2.4
Diesel/gasoline
List
All
List
of authorized
products
of authorized labeled. filling
operators
operators
stations posted.
posted.
3.
the
4.
2.
4.
Check
Check
Observe ifthe
assessment. safe
if facility
chemicals
they work are coaching
stored
in goodonsite: log are- check
condition being
check andif if results
met
0
5
1 --- All
3 BUT
R4.3.1 notR5.1.3
showing
not
requirementsmetnotimprovement
met BUT
met (a SIF trend or SIF Refer
Potential
coaching/OWD Hazardous Substances global 1 N/A N/A N/A N/A N/A N/A N/A
and what
R5.5.2
procedures
R5.1.6
R5.6.2 -- Chemical Incompatible
LPGto followed
do bulkif a filling
critical
by products point
operators.
stations withstored
ismaintained
notfacility
in working 5. Check
containment
Check
followed
in the
5.
thereCheck asifif the
if the
is coaching the to
defined area
operators
contain
area onin
is posted
the
isliftingspills.
posted areprotocol.
equipment
with
aware authorized
with authorized about 3
Actual
R5.2.1,
R5.5.2, R5.2.2,
R5.5.3,
related
R5.2.4,
R5.5.4
to R5.1.3 has
R5.2.5
AND ANDmet
R5.5.5
occurred)
R5.2.6 Substance Storage.
6.0 CONFINED SPACE R5.4.3
R5.2.5
order.conditions.
separately.
R5.3.4 --- Eyewash/ Compressed
Controlled
inventory
safety gas cylinder
shower all
inhandling
place and personnel. products
adequately
critical
2. Observe points
are
protected.
if incompatible
and
labeled
iswhat
correctly.
to are do
products
ifaccess
they in are not
stored in met
results
BUT BUT notR5.2.3
showing
1 violation ofnot
improvement
met (a R5.3.5
R5.5.1
trend or SIF protocol for more information on SDS
SIF Potential N/A N/A N/A N/A N/A N/A N/A
good
chemicals.
procedures
inspected. defined access and posted the for in the filling 4.
3.
5.
Check
personnel.
execution(positive
2. Check
Check
if the
ifif the
there
Compressed
area
controlled
and
chemicals corrective).
is maintained gas listed cylinder in good
tothe the
handling 1 -- R5.6.1
3
Actual
R5.3.1, R5.3.2,
AND
related
R5.3.4,
toR5.6.2
R5.2.3 met BUT AND R5.3.6
R5.6.3 not met management.
6.1 Confined Space Identication, Labelling and R4.2.8 --- All
R5.5.3
diesel/gasoline
R5.1.7
R6.1.1
R5.6.3
area.
If issues
Proper
Completed
SDS confined ventilation
updated arecoaching
station identified,
andall
spaces
for in storage
tolifting
necessary
identified.
chemicalsensure area.and in 1. working
separately.
6.
5. Checkorder.
diesel/gasoline
inventory.
procedures ifthe the
all
are station
confined
area
facility is
OWDs
defined/posted. and
maintained
spaces necessary
- check areinidentified.
if good
there are 5 met
0 -- All
1 BUT
R5.1.1, R5.3.3
requirements
R5.4.1, R5.1.2,
R5.4.2, not methas
R5.1.4,
met
R5.4.3 (aANDoccurred)
SIF
R5.1.5 Potential
OR R5.1.6
R5.4.5 metor SIF Refer to the Confined Space global protocol for 1 N/A N/A N/A N/A N/A N/A N/A
R5.2.6
R5.5.4
equipment
protection -
- All Battery
Area inare charging
properly
taken
place. out stations
labeled
of service maintained
andincontrolled
and condition
3. Observe
6. Check
Check ififthe
protections. with ifbeingeyewash
there
lifting is proper
equipment- / safety shower
ventilation
check present
in
if there 1
Actual - R5.5.2, R5.5.3,
related R5.5.4 AND R5.5.5 met
6.2 Inventory Space Entry Safe Execution
Confined operators
R6.1.2
available
R5.4.4
R6.2.1 -- Qualification conduct
on confined
all
Transportation shifts.LPG spaces bulk filling
labeled.
of cylinders
classroom adherence
aligned
training condition.
2.
diagnostics
3.
andwith storage
4.
1. Check all
there confinedisperformed
an updated
transportation spaces onofare lifting
SDS labeled
cylinders available is not
1
BUT met
-- R5.2.1,
R5.6.1
R5.4.4 metnotto
BUTR5.3.3
met R5.6.2
(a SIFhas occurred)
not met
Potential ORor SIF more information on confined spaceprotocol for
good
with
to
conditions.
thecompatibility
corrected
R5.3.5
R6.1.3 procedure. -- Completed Listprior
Inventory of to matrix.
next
certified
available use.operators toapproval posted. areCheck
and
5. inspected.
Check
if the
area.
deficiencies ifthe the
site
withqualifies
area iscritical
posted
employees
points and ifwith
with authorized it is in BUT 5
0 All
>1 requirements
R5.2.2,
violation met
ofR5.2.4,
R5.5.1 AND no
R5.2.5 SIF Potential
R5.2.6 Refer to the Confined Space global 1 N/A N/A N/A N/A N/A N/A N/A
7.0 VIOLENCE PREVENTION
R5.6.4
protocol.
R5.2.7
observation
R5.5.5 --- Waste
Process in
for employees
disposed
place
coaching forwho
properly toemployees.
perform
ensure for all
donetoinLPG 4.
7.
appropriately.
equipment
to
6. every
managed
classroom
Check
Observe
service.
shift.
the as Global
procedures.
if defined
training
Global
the area and Incident
inare
Incidenttheproperly
observation Management
protocol.
Management before and or
labeled
3
Actual
not -SIF
All
met requirements
relatedrelated
Actual met
to R5.4.4 but 1occurred)
has
to confined missed
spacespace entry indentification,
more information labelling
on confined and inventory. space entry safe N/A N/A N/A N/A N/A N/A N/A
R5.3.6
R5.1.8
new
R5.4.5 chemicals. - Signage Diesel/gasoline
Management posted filling
conducts
and station
area OWD hazards in allowing personnel.
System-
3.
4.
5. Check
Check
Observe has
ifif confined
therethere
if there
there been
aspace
is been
is process aentry.
SIF
inventory
inPotential
placeisand foror orarea SIF has 0 -- R5.6.1
0 R5.3.1,not R5.3.2, R5.3.4, R5.3.5 OR R5.3.6
met improving
operators
confined
accordance
maintained
bulk filling
space
conduct
inwithgood
procedures.
entry.battery
regulatory
conditions.
charging/watering
guidelines. System-
controlled,
6. Check
available
Actual
them
has
relatedifif including
to the
to perform
area
employees.
to safe asignage
is
a
maintained
operating
SIF
compatibility posted
Potential
rules inmatrix.
good
not being
SIF
being 0 1 --- R5.5.2,
not
occurred
met
All
AND
R5.5.3,
requirements R5.5.4
metcase OR
but 2
trend
R5.5.5
missed
in not met execution.
spaces
7.1 Cash Management Safe Execution R7.1.1
communicated.
adherence
R6.2.2 -- ConfinedCash to the management
procedure.
space entry strategy
procedures in place approval
1. Check
hazards
Actual
2. Check of there
all
communicated.
related new is achemicals.
cash management 5
0 Site
R5.4.1,hasR5.4.2,
eliminatedR5.4.3, OROR all
R5.4.5 not met Purpose: we must eliminate cash handling from 1 N/A N/A N/A N/A N/A N/A N/A
R5.3.7 - Completed coaching to ensure 5. Check
condition.
followed? ifif thethe to procedures
wastesafe operating
is disposal for entry rules
properlyare not done coaching/OWD results
7.2 Violence Prevention Safe Execution with
R5.4.6
R5.2.8
written
R7.2.1 a priority
and -- Violence
Completed
Management on elimination
available coaching
toconducts
prevention employees of tocashensure
OWD
procedures handling.
and to strategy
6. Checkinifthe
followed?
documented
1. Check place
the Global
and with
reviewed,
procedures a priority
Incident complete
for on elimination
Management
violence and of 5
requirements
- R6.1.1
All requirementsmet AND met improving
AND trend intrend in Purpose:
improving our operations. we must Until we have
identify the achieved
safe work100% 1 N/A N/A N/A N/A N/A N/A N/A
operators conduct Gas/Diesel refueling in in
7.
8. accordance
Check the with
Global
facility regulatory
Incident
coaching guidelines.
Management
log - check if 0 - not met OR >2 missed spaces
R7.1.2
conduct-complete
operators
reviewed.
written, Action
to conduct
battery plan toavailable
compressed eliminategas
charging/watering
and tocash. cylinder
employees. cash
System-
7. Check
adhered
prevention handlinghas
tothe bythere
are facility
employees.
written, been
coaching a SIFlog
complete Potential
- check
and available coaching/OWD
orif SIF coaching/OWD
3 - All requirements results
met AND no SIF Potential procedures
results elimination of cash we must must implement effective
7.3 Security Threat Assessment adherence
R7.3.1
R7.1.3
handling
procedures.
R6.2.3 -- SAT/RA in to
System theincompleted.
adherence
Confined
procedure.
place
space to
thecheck
to entry procedure. trucks and
procedures
System-
there
1.
2. Review
Check
Actual
there
3. Check is has
coaching
isrelated ififthe
coaching therethere
permits SAT
to safe isonbeen
onand
an
are LPG Action a bulk
market
operating
battery
completed
SIFplan Potential
filling
risk
rules in
charging/watering
and (positive
place
not orbeing
fields
SIF 5 - All requirements
to are or SIF Actual relatedmet to confined space entry Purpose: thethat
control strategies
employees
security threat assessment
to prevent
execute
theft and we ismust
toa 1 N/A N/A N/A N/A N/A N/A N/A
R7.2.2
R5.3.8 ----- SAT
Operators
Management execute withinviolence
conducts OWD prevention
to to employees. preventmanaged
violence. by These procedures must be
Yes 7.4 Violence Prevention Toolkit R7.3.2
facility
R5.4.7 cash
followed
R7.4.1
procedures Violencein
updated
storage.
Management
by refueling
employees.
adherencePrevention conducts
to the
the
Level OWD
program.
12 to ensure assessment:
lastassessment Actual
and
eliminate
followed?
(positive
filled
1.
2. Review
Check
related
corrective).
out and cash.
prior
ifthe
to safe
check
site’s
operators CSiflevel
corrective).
to
operating
the
Entry
are -SAT/RA
by
check
executing
rules
authorized how
not being 3 - All requirements met BUT coaching/OWD
is completedidperson
violence they 3 has
5 occurred
- All
All BUT coaching/OWD
requirements metbut BUT results not
coaching/OWD
routine
ensure
Purpose:
written
that
and
allrisk
theavailable the members
ourassessment
team global
for employees.
security
and adhere
violence teamto to 1 N/A N/A N/A N/A N/A N/A N/A
Gas/Diesel
months.
R7.1.4 - Effective procedures.
communication strategy followed?
9.
and
3. Check
updated
Check the
if there facility
within is a OWDs
the systemlast -12 check
in months.
place if to check 3
results - requirements
not showing me
improvementR7.3.3 not
trend assess
those the
strategies specific risks
through of
our each
OWD of and
our facilities
compressed
R6.2.4
completed
R7.2.3 -- Action
Confined
and
Completed gasaccurate.
cylinder
spacecoaching handling
permits togaps procedures.
completed
ensure 7.
and assess
and
8. Checkareand
Check
prevention usedthe facility
for alllevel
if facility
their
procedures coaching
entries.
OWDs inassessment- check
adherence log - check is theifif
if to showingnot
results improvement
showing trend
improvement trend prevention
Compliance toolkit is designed
withnecessary
these procedures to eliminate mustthese be
8.0 ROAD AND DRIVING SAFETY R7.3.3
implemented - to plan
minimize to address
theft. identified 8.
diagnostics
2. Check
trucks (trucks the
if the are being
action
fitted coaching
with performed
plan is
security logboxes
current -on checkLPG
and and if bulk
theare completely current and the
coaching actions
routines. Refer to tothe eliminate
global Violence N/A N/A N/A N/A N/A N/A N/A
filled
R7.4.2
operatorsout. - Violence
execute Prevention
violence Toolkit
prevention there
4. Check
diagnostics
accurate.
program. is coaching
if there
are being ison a compressed
final
performed check gas
conducted
on battery cylinder 3 - R7.4.2, R7.4.1 AND R7.4.3 BUT R7.4.4 not violence managedrisks. related
through fatal
our incidents
OWD and from our
coaching
in the
R7.1.5 SAT - If is
cash in place,
is handled, current, security and aligned
measures with there
filling
security
properly is coaching
procedures.
team
functioning). is on gas/diesel
aligned with action refueling plan. 1 - R7.1.1, R7.1.2, R7.1.3, R7.1.4 AND R7.1.5 security
Prevention This
protocol assessment
for addtional must
guidance.be
8.1 Driver Qualification Management R6.2.5
R8.1.1
implemented
procedures. - Confined
Site has aspace
definition
at appropriate level. permits of qualified
used priordriver,
to handling
prior
1. Review
to
charging/watering
2.
3. Check and (positive
authorization.
site the
the Global site’s and
procedures.
self assessment corrective).
definition
Incident Management of a qualified
of achievement current 1
5
1 -- R7.3.1- All requirements
R7.2.1 met met BUT met
BUT R7.3.2 BUT
R7.2.2 not a
not metSIF Potential
met (a SIF or Purpose:
operation.
routines. Refer the site
The site must
to the must define
global determine what
Violence it
their risk to
means 1 N/A N/A N/A N/A N/A N/A N/A
security team. (positive corrective).
in
100%place of- to
incorporating
R7.4.3 the reduce
Violence entries. the regulatory
all participate
local
Preventionrisks of cash handling
requirements. 4.
8.
5. Check
driver:
Check check ififthe there
the facility
if devicesis been
it containaOWDssystemand aa SIF toand
-monitoring
check
license, check if theor SIF 1
medical met
SIF BUT or
Actual R7.1.6
related not met
tomet (a SIFspace
confined toPotentialentry orhas completed
SIF be a qualified annually
driver, and the action
including regulatorylog
8.2 Hazardous Route Management R7.2.4
R8.2.1
while in--the
Management
Drivers market.
conducts in Toolkit OWD
updating tothe to
1.
9. Violence
System-
Review
Check
facility
has
depositthe Prevention
definedthere
facility
area hazardous
OWDs
(safe).
toolkit - check Potential
routes review
if : check if Actual Potential
5 - All SIF Actual
requirements
related to R7.1.6
related
hasnot
R7.2.2 has level
Purpose:usingour
Prevention
maintained
the
protocol risk assessment
hazardous
current.
for
Refer
addtional
routing tool,
the process
to risk globalWhen
and then
guidance.
Violence 1 N/A N/A N/A N/A N/A N/A N/A
R6.2.6
R8.1.2
achievement
violence
Hazardous Final
All drivers
prevention checkqualified
above
Route/Area conducted
90%.
procedures.
in DriverandtoTeam authorized.
confined room.by check,
diagnostics
equipment
site/vehicles
Actual
the drivers regulatory
related are
are
are – to being
in
check safe
included
performed
registration,
good working
ifoperating
thein the selfetc on
orderas required.
assessment
rules
process and
not and being is 3
are occurred
1
occurred) - R8.1.2,
R7.4.2 R8.1.1
met BUT met BUT
R7.4.1 1occurred)
violation
met of requirements
implement
requires usthe to and toolkit
evaluatezone requirements.
to the
that routeslevel's that our
8.3 Driving Safe Execution R7.1.6
R8.3.1 - Proactive
Cash
Safe handling
driving, procedures
parking and followed
operation diagnostics
5.
1. Check
Watch
compressed ifdriver are
strategy
gas being
departure,
cylinder performed
communication POC
handling onprocedures.
arrival, gas/
has diesel
been
talk 0 -- All
to R8.1.3
5 R7.3.1 not met met A
requirements Prevention protocol for addtional guidance. 1 N/A N/A N/A N/A N/A N/A N/A
space
R8.1.3
R7.4.4 permits.
R8.2.2 - Hazardous - Action plans process in place
routes/areas in place
to to
address
process ensuregaps available
2. Check
accurate.
followed?
in to drivers:
participate to
if all
employees
drivers
in updating meet prior
the Hazardousall to requirements
confined space 3 -- R7.1.1, R8.2.2 AND R8.2.3 metR7.1.4
BUT weak defining
requirements.qualifications,
Refer to ensure
the
drivers will drive, and identify the risks that global that you
Violence are are
operators.
practices are written, complete and available procedures.
implemented. check ifsite’s
themaintains
drivers are adhering to the 0 R7.1.2,
W met R7.1.3, OR R7.1.5 W
Yes 8.4 Telemetry Management R6.2.7
compliance.
in toolkit
place and - Confined
achievement.
visually expressedspace entry on devices and
Safety Board policies entry.
outlined
3.
4. Check
Route/Area in if
the the
the
in site
facility
Driver Team definition
coaching anof
log a - qualified
actioncheck plan if to 0 - Any
R7.4.2
R7.2.1 requirement
not not met considering
Prevention the
toolkit difference
for additional in qualification
guidance. 1 N/A N/A N/A N/A N/A N/A N/A
R7.1.7
employees.
monitoring - Completed
equipment coaching
available. to ensure 6.
6.
close
thereIf cash
driver.
Check gaps
is asifisdescribed
coaching handled,
there
to toolkit in the room.
check
isonaachievement
defined
violence if rescue
there
protocol
prevention and areteam ifissecurity
(Seatbelt isto 1
it that
execution
not met of
- R8.1.1
R8.2.1
met BUT R8.1.2 not met
present on those routes. These risks must then
requirements across different vehicle types.
Yes 8.5 Hours of Service Management in Driver
operators Team
conduct room. cash handling inpolicies
adherence 2. Check
measures if the hazardous route board up be communicated to our drivers, and risks that 1 N/A N/A N/A N/A N/A N/A N/A
R8.3.2
R6.2.8 Drivers
- Actions
Confined are spaceadhering entry ABIdevices andand date use
3.
is between
Check
trained
current.
(positive ifininthe
and place
each
rescue drivers
corrective). to
stop, reduce
can
procedures. electronic the risk
produce a of
device valid cash used N/A = No entry of confined spaces allowed. W Once the zone has a definition for a qualified
R8.2.3
to thedriving
procedure. - in place to address issues handling in the while Driver in Team
theOWDs market room. 1 - R8.2.2 met BUT R8.2.3 not implemented they identify must be communicated back and
Yes 8.6 Load Capacity Management safe
monitoring
identified in
rules (Seatbelt
equipment
Driver Team wellroom. use between each driver
maintained. when
7.
5.
3. Check
Check
Check
necessary
license. if actions
the
if thefacilityteam and
are isauthorized).
available
in - .check
place to and if notified
address
0 - R8.1.1 not met driver, they must implement a process to
communicated to others. A Whatsapp chat is a 1 N/A N/A N/A N/A N/A N/A N/A
R7.1.8electronic
stop,
R6.2.9 -- Rescue
Management team conducts
device used when
defined andOWD to cash
necessary
trained 7. Check
3.
4.
on issues
priorCheck if there
ifthe
toidentified
diagnostics CSE there Global
entries.
are have
is
being aIncidentbeen incidents
proactive Management
process ofintheft place or ensure that no one ever drives a vehicle unless
8.7 Commuting Safety Management handling procedures. violence involving theperformed
incash Driver
–conducted.
acheck Team on room.
if cash
violence 0 - R8.2.2 not met fine method for immediate notification of risks, 1 N/A N/A N/A N/A N/A N/A N/A
and
rescue authorized). procedures. System-
to Checkhas
8. monitor
prevention ifcompliance
the there
procedures.drills beenareand SIF
ensure Potential therehandling or
areSIF no they are qualified. Refer to the global Road and
follow procedures but the site should ensure that there is a record
8.8 Road Safety Risk Assessment and Toolkit R8.3.3
R6.2.10- -Safety Recuemonitoring team available and coaching and in place. Actual
gaps
9. Check inrelated thewere
driver to safe
Global followed.
authorization. operating
Incident rules not being
Management Driving safety global protocol for more
of risks that are identified, using the team room 1 N/A N/A N/A N/A N/A N/A N/A
up to give
R6.2.11 - Drills conducted. corrective feedback and positive 8. Check
followed? the Global
System- has there been a SIF Potential or SIF Incident Management information.
9.0 WORKING AT HEIGHTS System- has board, so that team members can reference N/A N/A N/A N/A N/A N/A N/A
recognition
R6.2.12 - Completed as appropriate. coaching to ensure 2. Check
Actual relatedthe there facility
to safe been
coaching a SIFlog
operating Potential
- check
rules notorbeing if SIF
Actual that information at a point in the future when it
Yes 9.1 Working at Heights Protection R8.3.4
operators - Management
conduct confined conducts space OWD entry toin safe therefollowed? isrelated
coaching to safe on safe operating drivingrules practice not being W 1 N/A N/A N/A N/A N/A N/A N/A
followed? is no longer fresh in the Whatsapp.Refer to the
9.2 Working at Heights Safe Execution driving
adherence practice. W to the procedure. (positive
10. Check and thecorrective).
facility coaching log - check if
9. coaching log - check if global Road and Driving safety W global protocol 1 N/A N/A N/A N/A N/A N/A N/A
R6.2.13 - Management conducts OWD to 3.
thereCheck the facility
is coaching onOWDs confined - check spaced if entry W W
Yes 9.3 Roof Work Management there is coaching on cash handling for more information.. W 1 N/A N/A N/A N/A N/A N/A N/A
confined space entry procedures. diagnostics
(positive andare being
corrective). performed on(positive
safe driving W
10.0 LOTO/SAM and corrective).
practice.
11. Check the facility OWDs - check if N/A N/A N/A N/A N/A N/A N/A
W W
10. Check the
diagnostics arefacilitybeing OWDs performed - check if
on confined
10.1 SAM Safe Execution diagnostics
space entry are being performed on cash
procedures. 1 N/A N/A N/A N/A N/A N/A N/A
10.2 LOTO Safe Execution handling procedures. W 1 N/A N/A N/A N/A N/A N/A N/A
10.3 LOTO Equipment Management W W 1 N/A N/A N/A N/A N/A N/A N/A
W
11.0 OCCUPATIONAL HEALTH W N/A N/A N/A N/A N/A N/A N/A
11.1 1 N/A N/A N/A N/A N/A N/A N/A
11.2 Hearing Conservation Management 1 N/A N/A N/A N/A N/A N/A N/A
W W
12.0 EMERGENCY RESPONSE N/A N/A N/A N/A N/A N/A N/A
W
12.1 Medical Device and First Aid Kit 1 N/A N/A N/A N/A N/A N/A N/A
Yes 12.2 1 N/A N/A N/A N/A N/A N/A N/A
12.3 Emergency Response Plan W 1 N/A N/A N/A N/A N/A N/A N/A
12.4 Specialized Emergency Response Management 1 N/A N/A N/A N/A N/A N/A N/A
12.5 Emergency Response Drill Management 1 N/A N/A N/A N/A N/A N/A N/A
W
13.0 TRAINING AND COMPETENCY N/A N/A N/A N/A N/A N/A N/A
13.1 Annual Refresher Training Management W 1 N/A N/A N/A N/A N/A N/A N/A
Yes 13.2 Qualification Training Management 1 N/A N/A N/A N/A N/A N/A N/A
MANAGE TO SUSTAIN N/A N/A N/A N/A N/A N/A N/A
14.0 OPERATIONAL SAFETY MANAGEMENT N/A N/A N/A N/A N/A N/A N/A
Yes 14.1 Inventory Management W 1 N/A N/A N/A N/A N/A N/A N/A
Yes 14.2 Risk Assessment Management 1 N/A N/A N/A N/A N/A N/A N/A
14.3 POC Assessment Management W 1 N/A N/A N/A N/A N/A N/A N/A
14.4 Personal Protective Equipment Management W 1 N/A N/A N/A N/A N/A N/A N/A
14.5 Safety MCRS 1 N/A N/A N/A N/A N/A N/A N/A
W
15.0 NON-STANDARD WORK MANAGEMENT N/A N/A N/A N/A N/A N/A N/A
W
Yes 15.1 Visitor Induction Management W 1 N/A N/A N/A N/A N/A N/A N/A
15.2 Contractor Induction Management 1 N/A N/A N/A N/A N/A N/A N/A
15.3 Major Works Management 1 N/A N/A N/A N/A N/A N/A N/A
Yes 15.4 Work Permit Management W 1 N/A N/A N/A N/A N/A N/A N/A
MANAGE TO IMPROVE N/A N/A N/A N/A N/A N/A N/A
W
16.0 BEHAVIORAL MANAGEMENT N/A N/A N/A N/A N/A N/A N/A
16.1 W W 1 N/A N/A N/A N/A N/A N/A N/A
16.2 Behavioral Safety Leadership 1 N/A N/A N/A N/A N/A N/A N/A
16.3 Safety Champions 1 N/A N/A N/A N/A N/A N/A N/A
W
16.4 Safety Committee 1 N/A N/A N/A N/A N/A N/A N/A
Questionnaire - Safety Pillar 85%
Reporting Period: Targets : 85% 80% Mandatory: 1
Facility Name: 80%

Question WH - WH DEL - DL
Mandatory ID Question/Topic Requirement How to Check Scoring Guidance DC Comments & doubts Global Owner Feedback WH - DDC WH - ABI DEL - DDC DEL - ABI DDC
Weight 3PL 3PL
16.5 World Safety Week R16.5.1 - Safety Day coordinated on April 28th 1. Review safety campaign material: Check if 5 - All requirements met Purpose: the purpose of world safety week is to 1 N/A N/A N/A N/A N/A N/A N/A
(or other date with agreement of Global Safety the site are executing a safety campaign with a make safety fun and to connect it people's
Director). coordinated Safety Day. 3 - R16.5.1 AND R16.5.2 met BUT R16.5.3 not passions. Throughout the year, safety focuses
R16.5.2 - Safety campaigns and materials 2. Check if it are covering the required met on compliance, ensuring the correct way to do
covering the required global/zone topics. global/zone topics. something, and quite a lot of rules. World
R16.5.3 - Minimum participation of 80% or 3. Check if the operators can reference safety 1 - R16.5.1 met BUT R16.5.2 not met Safety Week should br an engagement focused
higher on planned Safety day. campaigns and content. on getting people excited about safety. The
0 - R16.5.1 not met week should focus on the elements of the
safety program that most need strengthened
(based on performance). The week must be
much more than just training. The week should
feature games, food, prizes and other activities
which are exciting and serve to get team
members to connect with WHY safety is critical.
Refer to the Behavioral Safety Culture global
protocol for more information.

También podría gustarte