Está en la página 1de 9

PRESUPUESTO DE MATERIA PRIMA PRIMER TRIMESTRE

2,000
MATERIA PRIMA CANTIDAD PRECIO UNIT. C.UNITARIO CANTIDAD COSTO T.
MATERIA PRIMA 1 4 2,500 10,000 8,000 80,000,000
MATERIA PRIMA 2 3 1,800 5,400 6,000 32,400,000
MATERIA PRIMA 3 2 3,100 6,200 4,000 24,800,000
MATERIA PRIMA 4 1 1,200 1,200 2,000 2,400,000
22,800 139,600,000

FICHA ESTANDAR PARA FABRICAR EL PRODUCTO


MATERIAL CANTIDAD PRECIO C. TOTAL
MATERIA PRIMA 1 4 2,500 10,000
MATERIA PRIMA 2 3 1,800 5,400
MATERIA PRIMA 3 2 3,100 6,200
MATERIA PRIMA 4 1 1,200 1,200
TOTAL 22,800
SEGUNDO TRIMESTRE TERCER TRIMESTRE CUARTO TRIMESTRE TOTAL PRESUPUESTO

4,000 6,000 8,000 20,000


CANTIDAD COSTO T. CANTIDAD COSTO T. CANTIDAD COSTO T. CANTIDAD COSTO T.
16,000 160,000,000 24,000 240,000,000 32,000 320,000,000 80,000 800,000,000
12,000 64,800,000 18,000 97,200,000 24,000 129,600,000 60,000 324,000,000
8,000 49,600,000 12,000 74,400,000 16,000 99,200,000 40,000 248,000,000
4,000 4,800,000 6,000 7,200,000 8,000 9,600,000 20,000 24,000,000
279,200,000 418,800,000 558,400,000 1,396,000,000
PRESUPUESTO DE MATERIA PRIMA PRIMER TRIMESTRE
10,000
MATERIA PRIMA CANTIDAD PRECIO UNIT. C.UNITARIO CANTIDAD
MATERIA PRIMA X 2 1,600 3,200 20,000
MATERIA PRIMA Y 1.5 975 1,463 15,000
MATERIA PRIMA Z 1.2 2,700 3,240 12,000
7,903

FICHA ESTANDAR PARA FABRICAR EL PRODUCTO


MATERIAL CANTIDAD PRECIO C. TOTAL
MATERIA PRIMA X 2 1,600 3,200
MATERIA PRIMA Y 1.5 975 1,463
MATERIA PRIMA Z 1.2 2,700 3,240
TOTAL 7,903
PRIMER TRIMESTRE SEGUNDO TRIMESTRE TERCER TRIMESTRE CUARTO TRIMESTRE TOTAL PRESUPUESTO
10,000 12,000 14,000 16,000 18,000
COSTO T. CANTIDAD COSTO T. CANTIDAD COSTO T. CANTIDAD COSTO T. CANTIDAD
64,000,000 24,000 76,800,000 28,000 89,600,000 32,000 102,400,000 36,000
21,937,500 18,000 26,325,000 21,000 30,712,500 24,000 35,100,000 27,000
38,880,000 14,400 46,656,000 16,800 54,432,000 19,200 62,208,000 21,600
124,817,500 149,781,000 174,744,500 199,708,000
TOTAL PRESUPUESTO
18,000
COSTO T.
115,200,000
39,487,500
69,984,000
224,671,500
PRESUPUESTO DE MATERIA PRIMA PRIMER TRIMESTRE

850
MATERIA PRIMA CANTIDAD PRECIO UNIT. C.UNITARIO CANTIDAD COSTO T.
MATERIA PRIMA A 2.5 350 875 2,125 1,859,375
MATERIA PRIMA B 3 650 1,950 2,550 4,972,500
MATERIA PRIMA C 1.8 880 1,584 1,530 2,423,520
MATERIA PRIMA D 3.4 1,100 3,740 2,890 10,808,600
8,149 20,063,995

FICHA ESTANDAR PARA FABRICAR EL PRODUCTO


MATERIAL CANTIDAD PRECIO C. TOTAL
MATERIA PRIMA A 2.5 350 875
MATERIA PRIMA B 3 650 1,950
MATERIA PRIMA C 1.8 880 1,584
MATERIA PRIMA D 3.4 1,100 3,740
TOTAL 8,149
SEGUNDO TRIMESTRE TERCER TRIMESTRE CUARTO TRIMESTRE TOTAL PRESUPUESTO

1,700 3,400 6,800 12,750


CANTIDAD COSTO T. CANTIDAD COSTO T. CANTIDAD COSTO T. CANTIDAD COSTO T.
4,250 3,718,750 8,500 7,437,500 17,000 14,875,000 31,875 27,890,625
5,100 9,945,000 10,200 19,890,000 20,400 39,780,000 38,250 74,587,500
3,060 4,847,040 6,120 9,694,080 12,240 19,388,160 22,950 36,352,800
5,780 21,617,200 11,560 43,234,400 23,120 86,468,800 43,350 162,129,000
40,127,990 80,255,980 160,511,960 300,959,925
PRESUPUESTO DE MATERIA PRIMA PRIMER TRIMESTRE

15,000
MATERIA PRIMA CANTIDAD PRECIO UNIT. C.UNITARIO CANTIDAD COSTO T.
MATERIA PRIMA 1 4 25 100 60,000 6,000,000
MATERIA PRIMA 2 2.5 15 38 37,500 1,406,250
MATERIA PRIMA 3 3 10 30 45,000 1,350,000
MATERIA PRIMA 4 6.5 50 325 97,500 31,687,500
493 40,443,750

FICHA ESTANDAR PARA FABRICAR EL PRODUCTO


MATERIAL CANTIDAD PRECIO C. TOTAL
MATERIA PRIMA 1 4 25 100
MATERIA PRIMA 2 2.5 15 38
MATERIA PRIMA 3 3 10 30
MATERIA PRIMA 4 6.5 50 325
TOTAL 493
SEGUNDO TRIMESTRE TERCER TRIMESTRE CUARTO TRIMESTRE TOTAL PRESUPUESTO

20,000 25,000 30,000 90,000


CANTIDAD COSTO T. CANTIDAD COSTO T. CANTIDAD COSTO T. CANTIDAD COSTO T.
80,000 8,000,000 100,000 10,000,000 120,000 12,000,000 360,000 36,000,000
50,000 1,875,000 62,500 2,343,750 75,000 2,812,500 225,000 8,437,500
60,000 1,800,000 75,000 2,250,000 90,000 2,700,000 270,000 8,100,000
130,000 42,250,000 162,500 52,812,500 195,000 63,375,000 585,000 190,125,000
53,925,000 67,406,250 80,887,500 242,662,500

También podría gustarte