MUNICIPALIDAD PROVINCIAL DE

PAUCARTAMBO 22.- RESUMEN MENSUAL VALORIZADO


GERENCIA DE INFRAESTRUCTURA MES DE FEBRERO
Función : 15 TRANSPORTE
Programa : 036 TRANSPORTE URBANO Monto Programado S/. Err:509
Sub Programa : 0074 VIAS URBANAS Monto Asignado 2019 S/. 250,000.00
Meta : Fecha de Presentación 26 de marzo de 2023

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”,


“C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION,
DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION COSTO DIRECTO ANTERIOR ACTUAL ACUMULADO 
S/. Valorizado S/. % Valorizado S/. % Valorizado S/. % Valorizado S/. %
PROGRAMADO 2,336,335.11 1,051,350.80 45.00% 584,083.78 25.00% 1,635,434.58 70.00% #NAME? #NAME?
1 COSTO DIRECTO 2,336,335.11 156,908.15 6.72% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
COSTO DIRECTO TOTAL 2,336,335.11 156,908.15 6.72% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
GASTOS GENERALES 13.31% 310,911.61 20,880.81 #NAME? #NAME? #NAME?
GASTOS DE INSPECCION 4.09% 95,466.70 6,411.54 #NAME? #NAME? #NAME?
EXPEDIENTE TECNICO 1.50% 35,014.78 35,000.00 - 35,000.00 14.78
Err:509 Err:509 Err:509 - - - Err:509
COSTO TOTAL Err:509 219,200.50 Err:509 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
PROYECTO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD
PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”,
“R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE
CUSCO – DEPARTAMENTO DE CUSCO”
INFORME MENSUAL
AVANCE FISICO -
FINANCIERO MES DE
FEBRERO
2023

MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
PROYECTO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD
PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”,
“R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE
CUSCO – DEPARTAMENTO DE CUSCO”
INFORME MENSUAL
AVANCE FISICO -
FINANCIERO MES DE
FEBRERO
2023

MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
PROYECTO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD
PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”,
“R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE
CUSCO – DEPARTAMENTO DE CUSCO”
INFORME MENSUAL
AVANCE FISICO -
FINANCIERO MES DE
FEBRERO
2023
-

MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

CONTENIDO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

A. DATOS
ACTUALIZADOS DE LA
OBRA

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

B. FICHA TECNICA
RESUMEN

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

C.- ASPECTOS TECNICOS


DE OBRA

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

D.- RECURSOS
UTILIZADOS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

E.- RESUMEN DE OBRA

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.- AVANCE FÍSICO -


VALORIZACIÓN DE OBRA

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.1.- RESUMEN DE
VALORIZACION

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.2.- VALORIZADO DE
OBRA PRINCIPAL

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.3.- VALORIZACION
MAYORES METRADOS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.4.- VALORIZACION
PARTIDAS NUEVAS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.5.- VALORIZACION DE
PARTIDAS NUEVAS 02

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.6.- VALORIZACION
DEDUCTIVOS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.7.- HOJA RESUMEN


METRDOS DE PARTIDAS
PROGRAMADO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.8.- HOJA DE
METRADOS DE
PROGRAMADO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.9.- HOJA RESUMEN DE


METRADOS DE MAYORES
METRADOS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.10.- HOJA DE
METRADOS DE MAYORES
METRADOS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.11.- HOJA DE RESUMEN


METRADOS DE
PARTIDAS NUEVAS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.12.- HOJA DE
METRADOS DE PARTIDAS
NUEVAS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.13.- HOJA DE RESUMEN


METRADOS DE
PARTIDAS NUEVAS 02

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

23.- AVANCE
FINANCIERO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

23.1.- RESUMEN ANUAL


DE GASTO POR
ESPECIFICA

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

23.2.- RESUMEN
MENSUAL DE GASTOS
POR ESPECIFICA

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

23.3.- MANIFIESTO DE
GASTO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

24. MOVIMIENTO DE
ALMACEN

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

24.1.- RESUMEN DE
MOVIMIENTO DE
ALMACEN

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

24.2.- MOVIMIENTO
MENSUAL DE ALMACEN
VALORIZADO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

24.3.- CONTROL DE
MOVIMIENTO DIARIO DE
ALMACEN

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

25.MOVIMIENTO DE
EQUIPO MECANICO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

25.1.- RESUMEN
MENSUAL DE EQUIPO
MECANICO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

25.2.-MOVIMIENTO
MENSUAL DE EQUIPO
MECANICO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

25.3.-CONTROL DIARIO
DE EQUIPO MECANICO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

26.-PANEL FOTOGRÁFICO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

27.-CONTROL DE
CALIDAD

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

28.-ANEXOS

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

28.1.- COPIAS DE
CUADERNO DE OBRA

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

28.2.- COPIAS DE PARTE


DIARIO DE MAQUINARIA

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

28.3.- COPIAS DE NOTAS


DE ENTRADA DE
ALMACEN

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

28.4.- COPIAS DE NOTA DE


SALIDA DE ALMACEN
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

28.5.- S.S.O.M.A

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

28.4.- COPIAS DE NOTAS


DE SALIDA DE ALMACEN

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

28.4.- COPIAS DE NOTAS


DE SALIDA
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.14.- HOJA DE
METRADOS DE
PARTIDAS NUEVAS 02

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.15.- CRONOGRAMA
COMPARADO
PROYECTADO VS
EJECUTADO

MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”

22.16.- TAREO DE
PERSONAL
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

CONTENIDO
MES DE FEBRERO

INFORME TÉCNICO MENSUAL DE OBRA

Nº DESCRIPCIÓN CONTROL

CARATULA P
CONTENIDO P
A DATOS ACTUALIZADOS DE OBRA P
B FICHA TECNICA RESUMEN P
C ASPECTOS TECNICOS DE OBRA P
D RECURSOS UTLIZADOS P
E RESUMEN DE OBRA P
22 AVANCE FÍSICO - VALORIZACIÓN DE OBRA
22.1 RESUMEN DE VALORIZACIONES P
22.2 VALORIZACION OBRA PRINCIPAL P
22.3 VALORIZACION MAYORES METRADOS X
22.4 VALORIZACION PARTIDAS NUEVAS X
22.5 VALORIZACION PARTIDAS NUEVAS 02 X
22.6 VALORIZACION DE DEDUCTIVO X
22.7 RESUMEN HOJA DE METRADOS X
22.8 HOJA DE METRADOS P
22.9 RESUMEN HOJA DE METRADOS DE MAYORES METRADOS X
22.10 HOJA DE METRADOS DE MAYORES METRADOS X
22.11 RESUMEN HOJA DE METRADOS DE PARTIDAS NUEVAS X
22.12 HOJA DE METRADOS DE PARTIDAS NUEVAS X
22.13 RESUMEN HOJA DE METRADOS DE PARTIDAS NUEVAS 02 X
22.14 HOJA DE METRADOS DE PARTIDAS NUEVAS 02 X
22.15 CRONOGRAMA COMPARADO PROYECTADO VS EJECUTADO P
22.16 TAREO DE PERSONAL P
23 AVANCE FINANCIERO
23.1 RESUMEN ANUAL DE GASTOS POR ESPECIFICA P
23.2 RESUMEN MENSUAL DE GASTOS POR ESPECIFICA P
23.4 MANIFIESTO DE GASTO P
24 MOVIMIENTO DE ALMACEN
24.1 RESUMEN DE MOVIMIENTO DE ALMACEN P
24.2 MOVIMIENTO MENSUAL DE ALMACEN VALORIZADO P
24.3 CONTROL DE MOVIMIENTO DIARIO DE ALMACEN P
25 MOVIMIENTO DE EQUIPO MECANICO
25.1 RESUMEN MENSUAL DE EQUIPO MECANICO P
25.2 MOVIMIENTO MENSUAL DE EQUIPO MECANICO P
25.3 CONTROL DIARIO DE EQUIPO MECANICO P
26 PANEL FOTOGRÁFICO P
27 CONTROL DE CALIDAD X
28 ANEXOS
28.1 COPIAS DE CUADERNO DE OBRA P
28.2 COPIAS DE PARTE DIARIO DE MAQUINARIA P
28.3 COPIAS DE NOTAS DE ENTRADA DE ALMACEN P
28.4 COPIAS DE NOTA DE SALIDA DE ALMACEN P
P= Presentó N= No presentó X= No corresponde
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

INFORME DE MENSUAL

Febrero - 2023

ADMINISTRACIÓN DIRECTA

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD


PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”,
“R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
VIRGEN CONCEPCION, DISTRITO DE SANTIAGO –
PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

Residente de Obra ING. WILLIAM VARGAS MUÑOZ


Inspector de Obra ING. WILBERT HURTADO TERRAZAS

PROYECTO CORRESPONDIENTE AL AF - 2023


MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO
GERENCIA DE INFRAESTRUCTURA
“Año del Fortalecimiento de la Soberanía Nacional”

Modalidad de Ejecución Presupuestaria Directa

INFORME MENSUAL DE OBRA CORRESPONDIENTE AL


MES DE FEBRERO

FOTO DE LA OBRA

"PROYECTO : MEJORAMIENTO Y TRATAMIENTO DE LA CIRCUNVALACION DE LOS BARRIOS DE


KANCHISPUGIO, VALDIVIESO BUENO, VILLA DEL ROSARIO, PIOC, CONCHUPATA ALTA Y BAJA,
VIRGEN DEL CARMEN Y CARPAPAMPA, DISTRITO DE PAUCARTAMBO, PROVINCIA DE
PAUCARTAMBO CUSCO”

CÓDIGO 2498152
META SIAF 0034

Residente de Obra ING. WILLIAM DAVID VARGAS MUÑ OZ


Inspector de Obra ING. WILBERT RAUL HURTADO TERRAZAS

Año Fiscal 2,022


MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

A. DATOS ACTUALIZADOS DE OBRA

No INFORMACIÓN SOLICITADA DATO A PROPORCIONAR

1 DOCUMENTO TÉCNICO INFORME TECNICO MENSUAL DE FEBRERO DEL 2023

2 MES INFORMADO MES DE FEBRERO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”,


3 OBRA “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION,
DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

4 RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ


5 INSPECTOR ING. WILBERT RAUL HURTADO TERRAZAS
6 FECHA PRESENTACIÓN INFORME 26/03/2023
7 CODIGO UNICO 2498152
8 FUNCIÓN 15 TRANSPORTE
9 DIVICION FUNCIONAL 036 TRANSPORTE URBANO
10 GRUPO FUNCIONAL 0074 VIAS URBANAS

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”,


11 PROY Y/O ACTIVIDAD “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION,
DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

12 COMPONENTE
13 FINALIDAD
14 META SIAF 2,021 0054
15 FUENTE DE FINANCIAMIENTO CANON Y SOBRECANON
16 ENTREGA DE TERRENO 15 de noviembre de 2022
17 INICIO DE OBRA 1 de diciembre de 2022
18 FECHA DE CORTE DE OBRA 31 de diciembre de 2022
19 FECHA DE REINICIO DE OBRA 1 de febrero de 2023
20 TIEMPO PROGRAMADO 240 días calendario
21 Plazo Para Culmminacion de la Obra 29 de agosto de 2023
26 MODALIDAD DE EJECUCION EJECUCIÓN PRESUPUESTARIA DIRECTA
Página 53

-
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

B. FICHA TÉCNICA DE OBRA


MES DE FEBRERO
FECHA PRESENTACIÓN: 26/03/2023

DATOS DE LA OBRA

1 NOMBRE DEL PROYECTO “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”,
“H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO
DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

CODIGO UNICO DE INVERSIONES 2498152


MONTO DE INVERSION S/. 2,199,325.91

2 UNIDAD EJECUTORA
Unidad Ejecutora : MUNICIPALIDAD DISTRITAL DE SANTIAGO

3 SECUENCIA FUNCIONAL
Funció n 15 TRANSPORTE
Programa 036 TRANSPORTE URBANO
Sub Programa 0074 VIAS URBANAS
Meta SIAF 2,020 0054

4 UBICACIÓN
Region CUSCO
Provincia CUSCO
Distrito SANTIAGO
Region Geografica SIERRA
Altitud 3,578 m.s.n.m

5 AÑO PRESUPUESTAL 2023

6 RESPONSABLES DE LA EJECUCION DEL PROYECTO

RESIDENTE DE OBRA
Nombre: ING. WILLIAM DAVID VARGAS MUÑ OZ
Especialidad: Ingeniero civil C.I.P.: 203147
DNI: 45615781
INSPECTOR DE OBRA
Nombre: ING. WILBERT RAUL HURTADO TERRAZAS
Especialidad: Ingeniero Civil C.I.P.: 66706
DNI: 23857836
7 MODALIDAD EJECUCIÓN
Modalidad de Ejecució n EJECUCIÓ N PRESUPUESTARIA DIRECTA

8 FUENTE DE FINANCIAMIENTO
Fuente de Financiamiento CANON Y SOBRECANON

9 PRESUPUESTO APROBADO

DESCRIPCIÓN EXP. TÉCNICO


PROYECTO: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE
LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – 2,199,325.91
DEPARTAMENTO DE CUSCO”

ADECUADA INFRAESTRUCTURA PEATONAL 1,465,239.96


REPOSICION DE INSTALACIONES DE AGUA Y DESAGUE 274,112.49
MITIGACION DE IMPACTOS CULTURALES 13,926.17
COVID - 19 17,192.18
SEGURIDAD Y SALUD 31,120.73
MITIGACION DE IMPACTO AMBIENTAL 22,854.13
TRABAJOS COMPLEMENTARIOS 9,837.53
Costo Directo del Proyecto S/. 1,834,283.19
GASTOS GENERALES 13.31% 244,100.23
GASTOS DE INSPECCION 4.09% 74,951.99
LIQUIDACION DE OBRA 1.01% 18,500.00
EXPEDIENTE TECNICO 1.50% 27,490.50
Costo Total del Proyecto S/. 2,199,325.91
Plazo de Ejecució n (Días Calendarios) 240

10 VALORIZACION FISICA

VALORIZACION
DESCRIPCIÓN
ANTERIOR % ACTUAL % ACUMULADA %
OBRA PRINCIPAL - 0.00% 16,976.48 0.93% 16,976.48 0.93%

PRESUPUESTO TOTAL - 0.00% 16,976.48 0.93% 16,976.48 0.93%

11 PRESUPUESTO DE INVERSIÓN EXPEDIENTE TEC. BASICO. 2,199,325.91

COSTO DIRECTO 1,834,283.19


GASTOS GENERALES 244,100.23
GASTOS DE INSPECCION 74,951.99
LIQUIDACION DE OBRA 18,500.00
EXPEDIENTE TECNICO 27,490.50
Página 54

-
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

B. FICHA TÉCNICA DE OBRA


MES DE FEBRERO
FECHA PRESENTACIÓN: 26/03/2023

15 PRESUPUESTO ASIGNADO 1,900,000.00 100.00%


Municipalidad Distrital de Santiago:
PIM - 2023 1,900,000.00 100.00%
PRESUP. ANTERIOR - 0.00%
PRESUP. SALDO AL MES 1,900,000.00 100.00%
Transferencias -
Convenios (Municipalidades, etc.) -
Beneficiarios -

16 EJECUCION FINANCIERA CON REF. AL PRESUPUESTO DEL EXPEDIENTE TECNICO

PRESUPUESTO EJECUTADO MES ANTERIOR - 0.00%


PRESUPUESTO EJECUTADO DEL MES 100.00 0.03%
PRESUPUESTO EJECUTADO ACUMULADO 100.00 0.03%
SALDO PRESUPUESTO A EJECUTAR 2,199,225.91 602.46%

OBSERVACION:
El Proyecto inicia con la ejecucion fisica el 01 de Diciembre del 2022, dicha fecha se constata en el acta de inicio de ejecucion, como tambien en el
asisento N° 001 del cuaderno de Obra. Se presenta la primera paralizacion por cierre de a ñ o fiscal y cambio de gestion el dia 31 de Diciembre del
2022, dicha paralizacion se constata en el cuaderno de obra, asiento N°051.

Se Registra el reinicio de obra en fecha 01 de frebrero del 2023, posterior a la autorizacion de Plan de Monitoreo Arqueologico, dicho reinicio se
pone constancia en el cuaderno de obra, asiento N°052.

Se pone en conocimiento la falta de atencion de diversos requerimientos por parte de la oficina de abastecimientos de la MDS. Los cuales deberan
agilizarse con el objetivo de abastecer con insumos y/o Bienes y servicios al proyecto, de esa forma no afectar a la programacion de las metas para
el presente añ o.

17 DESCRIPCIÓN DE METAS FISICAS (RESUMEN)

Objetivo de la Obra
El objetivo principal es alcanzar los fines que propone el proyecto: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”,
“C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE
CUSCO”

Descripcion de Meta Fisica


El proyecto se orienta a mejorar las condiciones de servicio de Transitabilidad Peatonal en diversas calles de la APV. Virgen Concepcion, lo que a su
vez mejorara la calidad de Vida de los beneficiarios y pobladores que a diario transitan por la zona , otorg á ndole condiciones ó ptimas para el
desplazamiento y evitando asi los problemas de transitabilidad.
Segú n el expediente té cnico la obra contempla la construcció n de una adecuada infraestructura vehicular con pavimento de concreto, sistema de
evacuació n de aguas pluviales, reposició n de instalaciones sanitarias de agua y desagü e, para una adecuada circulació n vehicular. Por otro lado, se
desarrollará la adecuada infraestructura peatonal con construcció n de escalinatas, veredas y sardineles; con la finalidad de confinar las vías
vehiculares y peatonales, de igual forma se realizará la construcció n de muros de concreto cicló peo para el sostenimiento y estabilidad de taludes
en las escalinatas y en la vía proyectada. Así mismo se realizará el adecuado tratamiento de á reas verdes existentes en la zona del proyecto, así
como la señ alizació n, control de calidad de obra y mitigació n de impacto ambiental

18 PROGRAMACION DEL PROYECTO

Plazo de Ejecució n (Programado) 240 Dias Calendarios


Fecha de Inicio 01/12/2022
Fecha de Té rmino Programado 29/08/2023

Total dias calendarios modificado -

PLAZO DE EJECUCIÓN (Días Calendarios)


PLAZO ANTERIOR ACTUAL ACUMULADO AMPLIACION 1 AMPLIACION 2 SALDO
240 31 28 59 0 0 181
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

C. ASPECTOS TECNICOS
MES DE FEBRERO
C ASPECTOS TECNICOS

15 DESCRIPCION DE LA META EJECUTADA

A. OBJETIVOS GENERAL
El objetivo central es alcanzar los fines que propone el proyecto, para las siguientes intervenciones:
- Mejorar el flujo del transito peatonal de las 14 calles.
- Mantener la accesibilidad de las vías peatonales en temporadas de lluvias.
- Mejorar el equipamiento vial del Distrito de Santiago.
- Mejorar las condiciones de vida de los usuarios beneficiados, evitando los problemas de transitabilidad
peatonal.

B. OBJETIVOS ESPECIFICOS
- Adecuada infraestructura peatonal.
- Adecuado equipamiento y acondicionamiento urbano.
- Adecuada estabilizació n de taludes.
- Adecuada evacuació n de aguas pluviales.
- Adecuado ornato y á reas verdes.

16 DOCUMENTACIÓN ADMINISTRATIVA

DOCUMENTACIÓN RELACIONADO AL EXPEDIENTE TECNICO

DESCRIPCIÓN DOCUMENTO NÚMERO FECHA


Resolució n de Gerencia
Exp.Tecnico Municipal N° 430-2021-GM/MDS 12/22/2021

PERSONAL RESPONSABLE DEL PROYECTO (RESIDENTES)

DESCRIPCIÓN DOCUMENTO NÚMERO FECHA


Ing. Jorge Luis Gutierrez Chavez
Designació n de 1° Residente Memorandum N°240-2022/MDS/GI-DO 2/15/2021
Ing. William Vargas Muñoz
Designació n de 2° Residente Memorandum N°001-2023-DO-GL/MDS 1/3/2023

PERSONAL RESPONSABLE DEL PROYECTO (INSPECTORES DE OBRA)

DESCRIPCIÓN DOCUMENTO NÚMERO FECHA


Ing. Luis Adolfo Vitorino Chavez
Designació n de 1° Inspector Memorandum N°294-2022/MDS-GM/OSI-HDGV 2/15/2021
Ing. Wilbert Hurtado Terrazas
Designació n de 2° Inspector Memorandum N°60-2021/GI/RAC-MPP 4/5/2021

CUADERNO DE OBRA
DESCRIPCIÓN DOCUMENTO NÚMERO FECHA
Entrega de Terreno Acta/cuaderno de obra S/N 15/11/2022
Inicio de Obra Acta/cuaderno de obra S/N 01/12/2022
Cuaderno de Obra Vol. I Legalizació n S/N 05/11/2022
Cuaderno de Obra Vol. II Legalizació n S/N -
-

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRA

D. RECURSOS UTILIZADOS
MES DE FEBRERO
17 RECURSOS UTILIZADOS

17.1 RECURSOS HUMANOS

PERSONAL DE OBRA CANTIDADES (UND)


CATEGORIA Diciembre Enero Febrero Marzo Abril Mayo Junio Julio Agosto Setiembre Octubre
PROFESIONAL:
Jefe de Proyecto
Residente de Obra 1 1
Inspector de Obra 1 1
TÉCNICO:
Asistente Técnico 1 1
Maestro de Obra 1 1
Asist. Adm.Supervision
Técnico de Suelos
Topó grafo 1
ADMINISTRATIVO:
Técnico Administrativo 1 1
Almacenero de Obra 1 1
Prevencionista 1
Enfermera
Guardiá n 1 1
OBRERO:
Capataz
Operador E.P/E.L.
Operario 2 1
Oficial 3
Peó n 5 11
TOTAL 14 0 24 0 0 0 0 0 0 0 0

17.2 EJECUCION FINANCIERO

DESCRIPCION PROGRAMADO ANTERIOR ACTUAL ACUMULADO


MUNICIPALIDAD S/.2,199,325.91 S/.0.00 S/.100.00 100.00
CONVENIO - - - -
BENEFICIARIOS - - - -
TOTAL 2,199,325.91 0.00 100.00 100.00
* En el ítem de programado se consigna lo formulado en el Expediente Técnico

17.3 RECURSOS DE MAQUINARIA , EQUIPO Y BIENES PATRIMONIALES

CANTIDAD (UND)
DESCRIPCION
Diciembre Enero Febrero Marzo Abril Mayo Junio Julio Agosto Setiembre Octubre
MAQUINARIA PESADA
Tractor sobre orugas
Cargador Frontal
Retroexcavadora 1
Motoniveladora
Rodillo Liso Vib. Autoport.
Compresora Neumá tica
VEHICULOS
Camió n Volquete 2
Camió n Cisterna
Camió n Canter 2
Camioneta
moto lineal
MAQUINARIA LIVIANA
Mezcladora
Vibradora
Ganguro Compactadora
Motobomba
Wincha
EQUIPO DE TOPOGRAFIA
Teodolito
Nivel Topográ fico
Estació n Total
Mira Topográ fica
Jalones
TOTAL 0 0 5 0 0 0 0 0 0 0 0
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

E. EJECUCION FISICO - FINANCIERA


MES DE FEBRERO

18 EJECUCIÓN FÍSICA

18.1 VALORIZACION TOTAL DE OBRA


VALORIZACION FISICA :
VALORIZACION
DESCRIPCION SALDO
PROGRAMADO ANTERIOR ACTUAL ACUMULADO
OBRA PRINCIPAL 1,834,283.19 - 16,976.48 16,976.48 1,817,306.71

VALORIZACION FINANCIERO:
VALORIZACION
DESCRIPCION SALDO
PROGRAMADO ANTERIOR ACTUAL ACUMULADO
OBRA PRINCIPAL 2,199,325.91 - 100.00 S/ 100.00 2,199,225.91

19 AVANCE DE PLAZO DE EJECUCION

Plazo de Ejecucion 240 Dias Calendario


Fecha de inicio de Obra: 01/12/2022
Fecha de Conclusion (Program.) 29/07/2023

20 LIMITACIONES Y RECOMENDACIONES GENERALES


*

*
La entidad ha indicado a los ejecutores de la obra que el presupuesto asignado para el presente añ o es de s/. 3,000,000.00 tal cual figuraba en el PIA, motivo por el cual las
metas fisicas del añ o 2022 estan basadas a ese monto asignado inicialmente, Pero sin aviso y sin cordinacion el area de planificacion de la entidad ha asignado en febrero un
presupuesto de s/ 6,000,000.00 y a mediados de marzo ha retirado s/ 500,000.00, pero consultando con la gerencia de Infraestructura nos indican que debemos mantener
nuestra programacion fisica con 3,000,000.00, este hecho refleja una falta de coordinacion entre el area de planificacion y la gerencia de obras. Por tal motivo la residencia y
la supervision de ala obra deslindan cualquier controversia con relacion a la ley de contrataciones y normas de planificacion en obras por administracion directa que se
podrian generar en el presente proyecto.
* Se indica que tambien se tiene limitaciones por el transito vehicular que existen en a zona del proyecto ls cuales se informara a la unidad de transporte para cerrar el tramo
de intervencion y dar una alternativa.
*
Se indica que existe limitaciones por problemas sociales, debido a que los usuarios del tramo en intervencion generan conflictos por la construcciones de
veredas en sus limites de propiedad afectando al ancho de la via planteada en el proyecto.
MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO

GERENCIA DE INFRAESTRUCTURA

INFORME TECNICO MENSUAL DE OBRA


MES: MES DE FEBRERO

PROYECTO:
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”,
“D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE
CUSCO”
Residente de Obra : ING. WILLIAM DAVID VARGAS MUÑ OZ
Inspector de Obra : ING. WILBERT RAUL HURTADO TERRAZAS

2018

MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO

GERENCIA DE INFRAESTRUCTURA

INFORME TECNICO MENSUAL DE OBRA


MES: MES DE FEBRERO

PROYECTO:
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”,
“D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE
CUSCO”
Residente de Obra : ING. WILLIAM DAVID VARGAS MUÑ OZ
Inspector de Obra : ING. WILBERT RAUL HURTADO TERRAZAS

2018

MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO

GERENCIA DE INFRAESTRUCTURA

INFORME TECNICO MENSUAL DE OBRA


MES: MES DE FEBRERO

PROYECTO:
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”,
“D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE
CUSCO”
Residente de Obra : ING. WILLIAM DAVID VARGAS MUÑ OZ
Inspector de Obra : ING. WILBERT RAUL HURTADO TERRAZAS

2018
GOBIERNO REGIONAL CUSCO EJECUCION FINANCIERA
GERENCIA REGIONAL DE INFRAESTRUCTURA
Sub Gerencia de Obras

C.3 EJECUCION FINANCIERA

C.3.1 AVANCE FINANCIERO


El gasto ejecutado correspondiente al mes de Octubre asciende a la cantidad de S/. 69,895.56 nuevo soles y
representa el 9.22 %, siendo el gasto acumulado a la fecha S/. 254,237.94 nuevos soles y representa el 33.54 % del
Presupuesto aprobado que figura en el Expediente Técnico.

GASTO GASTO
MES SALDO
PROGRAMADO EJECUTADO
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SETIEMBRE
OCTUBRE 165,235.51 27.86% 146,901.89 25.42% 18,333.62
NOVIEMBRE
DICIEMBRE
TOTAL 165,235.51 27.86% 146,901.89 25.42% 18,333.62

C.3.2 GASTOS CLASIFICADOS

PRESUPUESTO DEL MES ACUMULADO


ITEMS
APROBADO PROGRAM EJECUTADO PROGRAM EJECUTADO
Mano de Obra 172,482.53 #REF!
Materiales 592,783.77 #REF!
Equipo Mecanico 168,521.69 #REF!
Herramientas 5,174.48
Costos Indirectos 64,694.51 #REF!
0.00 #REF! 0.00 0.00
TOTAL 1,003,656.98
0.00% #REF! 0.00% 0.00%

C.3.3 AVANCE FINANCIERO

PRESUPUESTO MAT. EN CANCHA


GASTO DEL MES TOTAL SALDO
APROBADO CANCHA

7,256,812.20 350,000.00 1,007,490.00 8,614,302.20 -8,614,302.20

C.4 AVANCE DEL PLAZO DE EJECUCION

INICIAL MODIFICADO PARALIZADO AMPLIACION EJECUTADO


40 25 340
300 365
13.33% 8.33% 113.33%

C.5 CRONOLOGIA DE EJECUCION

ENTREGA INICIO DE CONCLUSION DE OBRA


GOBIERNO REGIONAL CUSCO EJECUCION FINANCIERA
GERENCIA REGIONAL DE INFRAESTRUCTURA
Sub Gerencia de Obras

TERRENO OBRA PROGRAM ESTIMADA REAL


5/2/2006 5/2/2006 2/15/2007 4/30/2007 4/30/2007
GOBIERNO REGIONAL CUSCO EJECUCION FINANCIERA
GERENCIA REGIONAL DE INFRAESTRUCTURA
Sub Gerencia de Obras

C.6 EVALUACIÓN TECNICA FINANCIERA

C.7 LIMITACIONES Y RECOMENDACIONES


Dentro de las limitaciones que se han tenido en el presente mes fueron la atención oportuna de los requerimientos
solicitados.
En el presente mes se tramitaron un total de 25 requerimientos de insumos considerados en el cronograma de
adquisiciones, de los cuales han sido atendido un total de 17 requerimientos.
En el presente mes no se conto con la participación de los beneficiarios
- FORMATO - 08
MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO RESUMEN AVANCE MENSUAL VALORIZADO - COSTO DIRECTO
GERENCIA DE INFRAESTRUCTURA
MES DE FEBRERO
"PROYECTO : MEJORAMIENTO Y TRATAMIENTO DE LA CIRCUNVALACION DE LOS BARRIOS DE KANCHISPUGIO, VALDIVIESO BUENO, VILLA DEL ROSARIO, PIOC, CONCHUPATA ALTA Y BAJA, VIRGEN DEL CARMEN Y CARPAPAMPA, DIST
OBRA: RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑ OZ
INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
INFORME TÉCNICO MENSUAL MES DE FEBRERO FECHA PRESENTACIÓN: 26/03/2023

MODIFICACIONES DE OBRA
OBRA PRINCIPAL TOTAL GENERAL
AÑO MES MAYORES METRADOS PART. NUEVAS / OBRA COMPLEM. DEDUCTIVOS
PROGRAMADO ACUM PROG EJEC ANTER EJEC DE MES EJEC ACUM MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL

ENERO #REF! #REF! - - - - - - - - - -


FEBRERO #REF! #REF! - - - - - - - - - - - - - - -
MARZO #REF! #REF! - - - - - - - - - - - - - -
ABRIL #REF! #REF! - Err:509 Err:509 - Err:509 Err:509 - Err:509 Err:509 - - - - Err:509 Err:509
MAYO #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
AÑO 2,017

JUNIO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
JULIO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
AGOSTO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
SEPTIEMBRE #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
OCTUBRE #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
NOVIEMBRE #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
DICIEMBRE #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO
“AMPLIACION Y MEJORAMIENTO DE LA DEFENSA RIBEREÑA EN LA MARGEN IZQUIERDA DEL RIO MAPACHO SECTORES MIRAFLORES-SAN ISIDRO, DISTRITO DE PAUCARTAMBO, PAUCARTAMBO – CUSCO”.
CRONOGRAMA VALORIZADA DE OBRA
MES NOV - 2012 MES DIC - 2012 MES ENE - 2013 MES FEB - 2013 MES MAR - 2013 MES ABR - 2013 MES MAY - 2013 MES JUN - 2013
ITEM DESCRIPCION UND. METRADO PRESIO (S/.) PARCIAL (S/.)
PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA 7 60mX3 60m udn 1.00 638.80 S/. 638.80
01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2 120.00 119.66 S/. 14,359.20
02 TRABAJOS PRELIMINARES
02.01 TRANSPORTE DE EQUIPO MAQUINARIA Y MATERIALES
02.01.01 TRANSPORTE DE MATERIALES DE OBRA GLB 1.65 2,500.00 S/. 4,125.00 4,125.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.01.02 TRANSPORTE DE MATERIALES DE OBRA GLB 1.63 1,500.00 S/. 2,445.00 2,445.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.02 DEMOLICIONES
02.02.01 DESMONTAJE DE MALLA DE GAVIONES m 2,375.52 4.47 S/. 10,618.57 10,618.57 100.00% S/. 0.00 0.00% S/. 0.00 0.00% 0 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 ML) m3 3,088.18 31.59 S/. 97,555.61 97,555.61 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.02.03 ELIMINACION DE DESMONTE CON MAQUINARIA D=5KM m3 3,088.18 19.33 S/. 59,694.52 59,694.52 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.03 LIMPIEZA DEL TERRENO
02.03.01 LIMPIEZA DE TERRENO MANUAL m2 2,865.82 2.53 S/. 7,250.52 7,250.52 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.03.02 LIMPIEZA PERMANENTE DE OBRA m2 2,800.82 1.58 S/. 4,425.30 4,425.30 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.04 TRAZO, NIVELES Y REPLANTEO
02.04.01 TRAZO, NIVELES Y REPLANTEO PRELIMINARL m2 3,152.32 1.15 S/. 3,625.17 3,625.17 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.04.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJECUCION DE OBRA m2 3,152.32 0.57 S/. 1,796.82 1,796.82 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION MASIVA A MAQUINARIA EN TERRENO NORMAL C/RETROm3 5Y3 17,917.67 17.02 S/. 304,958.74 304,958.74 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
03.02 REFINE Y CONFORMACION DE ZANJAS m2 1,886.50 0.79 S/. 1,490.34 1,490.34 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
03.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO m3 9,346.60 16.99 S/. 158,798.73 158,798.73 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
03.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=5KM m3 9,518.79 20.67 S/. 196,753.39 196,753.39 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
04 OBRAS DE CONCRETO SIMPLE
04.01 MURO DE CONCRETO CICLOPEO
04.01.01 CONCRETO CICLOPEO FC=140 KG/CM2 +70 % PM EN MURO DE CONTm3 9,986.74 254.40 S/. 2,540,626.66 2,540,626.66 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
04.01.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENSION m2 7,574.83 34.93 S/. 264,588.81 264,588.81 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
04.01.03 ENBOQUILLADO DE PIEDRA m3 124.72 14.12 S/. 1,761.05 1,761.05 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
04.01.04 GEOTEXTIL m2 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
05 CONTROL DE CALIDAD
05.01 DISEÑO DE MEZCLA DE CONCRETO Und 1.00 500.00 S/. 500.00 500.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
05.02 ROTURA DE BRIQUETAS Und 20.00 35.00 S/. 700.00 700.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
05.03 ENSAYO DE DENSIDAD DE CAMPO Und 5.00 35.00 S/. 175.00 175.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
06 PLACA RECORDATORIO
06.01 DISEÑO DE MEZCLA DE CONCRETO Und 1.00 883.46 S/. 883.46 883.46 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07 IMPACTO AMBIENTAL
07.01 LIMPIEZA GENERAL DE OBRA m2 600.00 7.26 S/. 4,356.00 4,356.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07.02 ELIMINACION DE DESMONTE CON MAQUINARIA D=5KM m3 156.00 19.33 S/. 3,015.48 3,015.48 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07.03 REFORESTACION DE ORILLAS Y LADERAS HA 0.79 2,500.00 S/. 1,975.00 1,975.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07.04 REPOSICION DE AREAS AFECTADAS HA 0.40 5,000.00 S/. 2,000.00 2,000.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07.05 RECUPERACJON DE AREAS OCUPADAS m2 0.20 52.95 S/. 10.59 10.59 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
08 GAVIONES DE PROTECCION
08.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.02 EXCAVACION MASIVA A MAQUINARIA EN TERRENO m3 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.03 PERFILADO Y COMPACTADO CON EQUIPO m2 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.04 RELLENO CON MATERIAL PROPIO CON EQUIPO m3 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=5KM m3 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.06 GEOTEXTIL m2 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.07 ACARREO DE PIEDRA MEDIANA DE RELLENO D=5KM m3 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.08 ARMADO Y LLENADO DE CAJA DE GAVION DE 1.00X0.30X2.00m (tipo Und 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.09 PERFILADO Y COSIDO DE TAPAS DE GAVIONES Und 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
09 CAPACITACION
09.01 CONSERVACIÓN DE DEFENSA RIVEREÑA GLB 1.00 7,000.00 S/. 7,000.00 7,000.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
09.02 EDUCACION Y CUIDADO AMBIENTAL GLB 1.00 5,000.00 S/. 5,000.00 5,000.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
10 OTROS
10.01 EXTRACCION DE AGUA PARA CIMENTACION Dia 140.00 414.76 S/. 58,066.40 58,066.40 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%

TOTAL S/. 3,759,194.15 S/. 3,744,196.16 99.60% S/. - 0.00% S/. 0.00 0.00% S/. - 0.00% S/. - 0.00% S/. - 0.00% S/. - 0.00% S/. - #DIV/0!
GASTOS GENERALES 8.22% S/. 308,849.18 S/. 307,616.97 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE SUPERVISION 2.10% S/. 79,062.13 S/. 78,746.70 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE LIQUIDACION 1.09% S/. 40,883.15 S/. 16,000.00 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE EXPEDIENTE TECNICO 2.70% S/. 101,389.55 S/. 100,985.04 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
TOTAL S/. 4,289,378.16 S/. 4,247,544.88 S/. 0.01 S/. 0.01 S/. 0.01 S/. - S/. - S/. - S/. -
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

22.1.- RESUMEN MENSUAL VALORIZADO


MES DE FEBRERO

Función : 15 TRANSPORTE
Programa : 036 TRANSPORTE URBANO Monto Programado S/. 2,199,325.91
Sub Programa : 0074 VIAS URBANAS Monto Asignado 2023 S/. 1,900,000.00
Meta : 0054 Fecha de Presentación 26 de marzo de 2023
PROYECTO :
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

PRESUPUESTO AVANCES
COSTO DIRECTO SALDO
ITEM DESCRIPCION MODIFICADO ANTERIOR ACTUAL ACUMULADO 
S/. % Valorizado S/. % Valorizado S/. % Valorizado S/. % Valorizado S/. %

1 PRESUPUESTO APROBADO 1,834,283.19 - 0.00% 16,976.48 0.93% 16,976.48 0.93% 1,817,306.71 99.07%
2 MAYORES METRADOS - - 0.00% - 0.00% - 0.00% 0.00 0.00%
3 PARTIDAS NUEVAS - - 0.00% - 0.00% - 0.00% 0.00 0.00%
4 DEDUCTIVOS - - 0.00% - 0.00% - 0.00% 0.00 0.00%
COSTO DIRECTO TOTAL 1,834,283.19 - 0.00% 16,976.48 0.93% 16,976.48 0.93% 1,817,306.71 99.07%
GASTOS GENERALES 13.31% 244,100.23 13.31% 50,972.18 20.88% - 0.00% 50,972.18 20.88% 193,128.05 79.12%
GASTOS DE INSPECCION 4.09% 74,951.99 4.09% - 0.00% - 0.00% - 0.00% 74,951.99 100.00%
LIQUIDACION DE OBRA 1.01% 18,500.00 1.01% - 0.00% - 0.00% - 0.00% 18,500.00 100.00%
EXPEDIENTE TECNICO 1.50% 27,490.50 1.50% 27,490.50 100.00% - 0.00% 27,490.50 100.00% - 0.00%
COSTO TOTAL 2,199,325.91 78,462.68 3.57% 16,976.48 0.77% 95,439.16 4.34% 2,103,886.75 95.66%
Página 65

FORMATO - 13

22.2.- VALORIZACION EXPEDIENTE DE OBRA MES DE FEBRERO

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
01 ADECUADA INFRAESTRUCTURA PEATONAL 1,465,239.96
01.01 OBRAS PROVISIONALES 13,846.77
01.01.01 CARTEL DE IDENTIFICACION DE OBRA 3.60x2.40 m und 1.00 834.77 834.77 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 834.77 100.00%
01.01.02 ALMACEN DE OBRA,OFICINA,GUARDIANIA m2 100.00 70.12 7,012.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 100.00 7,012.00 100.00%
01.01.03 ALQUILER DE AMBIENTES PARA OFICINAS mes 8.00 750.00 6,000.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.00 6,000.00 100.00%
01.02 TRABAJOS PRELIMINARES 54,279.58
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 4,200.00 4,200.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 4,200.00 100.00%
01.02.02 TRANSPORTE DE MATERIALES CUSCO-OBRA glb 1.00 4,503.61 4,503.61 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 4,503.61 100.00%
01.02.03 TRAZO, NIVELES Y REPLANTEO m2 5,916.98 1.19 7,041.21 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5916.98 7,041.21 100.00%
01.02.04 DEMOLICION DE ESTRUCTURAS DE CONCRETO m2 83.74 121.29 10,156.82 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 83.74 10,156.82 100.00%
01.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=10 km m3 16.75 24.69 413.56 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 16.75 413.56 100.00%
01.02.06 LIMPIEZA GENERAL m2 5,916.98 0.67 3,964.38 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5916.98 3,964.38 100.00%
01.02.07 SEÑALIZACION DE SEGURIDAD glb 20.00 1,200.00 24,000.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 20.00 24,000.00 100.00%
01.03 CONSTRUCCION DE ESCALINATAS 457,470.98
01.03.01 TRAZO, NIVELES Y REPLANTEO m2 2,031.34 1.19 2,417.29 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2031.34 2,417.29 100.00%
01.03.02 CORTE DE MATERIAL SUELTO CON EQUIPO m3 1,909.16 1.50 2,863.74 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1909.16 2,863.74 100.00%
01.03.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 1,261.67 21.75 27,441.32 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1261.67 27,441.32 100.00%
01.03.04 PERFILADO, RIEGO Y COMPACTADO m2 1,927.36 8.72 16,806.58 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1927.36 16,806.58 100.00%
01.03.05 EMPEDRADO DE ESCALINATAS DE E=6" m2 1,927.36 25.57 49,282.60 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1927.36 49,282.60 100.00%
01.03.06 ENCOFRADO Y DESENCOFRADO DE ESCALINATAS m2 1,101.50 36.83 40,568.25 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1101.50 40,568.25 100.00%
01.03.07 CONCRETO f'c=175 kg/cm2, PARA ESCALINATAS m3 225.95 416.71 94,155.62 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 225.95 94,155.62 100.00%
01.03.08 CURADO DE CONCRETO m2 2,630.11 5.25 13,808.08 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2630.11 13,808.08 100.00%
01.03.09 ACARREO MANUAL D = 25 m m3 841.73 23.16 19,494.47 0.00 0.00 0.00% 444.21 10,287.90 52.77% 444.21 10,287.90 52.77% 397.52 9,206.56 47.23%
01.03.10 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=10 km m3 841.73 24.69 20,782.31 0.00 0.00 0.00% 30.00 740.70 3.56% 30.00 740.70 3.56% 811.73 20,041.61 96.44%
01.03.11 BARANDAS METALICAS CON TUBO DE FIERRO GALVANIZADO DE 2 1/2" m 1,633.18 97.23 158,794.09 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1633.18 158,794.09 100.00%
01.03.12 PINTADO DE BARANDAS METALICAS m 1,633.18 6.77 11,056.63 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1633.18 11,056.63 100.00%
01.04 SARDINELES 34,262.15
01.04.01 TRAZO, NIVELES Y REPLANTEO m2 204.13 1.19 242.91 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 204.13 242.91 100.00%
01.04.02 EXCAVACION MANUAL m3 4.19 27.03 113.26 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.19 113.26 100.00%
01.04.03 ACARREO MANUAL D = 25 m m3 4.19 23.16 97.04 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.19 97.04 100.00%
01.04.04 ENCOFRADO Y DESENCOFRADO DE SARDINELES DE CONCRETO m2 492.06 36.95 18,181.62 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 492.06 18,181.62 100.00%
01.04.05 CONCRETO f'c=175 kg/cm2, PARA SARDINELES m3 28.79 416.71 11,997.08 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 28.79 11,997.08 100.00%
01.04.06 CURADO DE CONCRETO EN SARDINELES m 2,041.30 1.38 2,816.99 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2041.30 2,816.99 100.00%
01.04.07 SELLADO DE JUNTAS EN SARDINELES m 155.20 5.24 813.25 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 155.20 813.25 100.00%
01.05 VEREDAS 50,412.30
01.05.01 TRAZO, NIVELES Y REPLANTEO m2 630.97 1.19 750.85 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 630.97 750.85 100.00%
01.05.02 EXCAVACION MANUAL m3 63.10 27.03 1,705.59 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 63.10 1,705.59 100.00%
01.05.03 NIVELACION Y COMPACTADO MANUAL m2 630.97 2.45 1,545.88 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 630.97 1,545.88 100.00%
01.05.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 47.58 36.83 1,752.37 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 47.58 1,752.37 100.00%
01.05.05 EMPEDRADO DE e= 6" cm m2 630.97 27.85 17,572.51 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 630.97 17,572.51 100.00%
01.05.06 CONCRETO f'c=175 kg/cm2, PARA VEREDAS m3 63.10 416.71 26,294.40 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 63.10 26,294.40 100.00%
FORMATO - 13
Página 66

22.2.- VALORIZACION EXPEDIENTE DE OBRA MES DE FEBRERO

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
01.05.07 SELLADO DE JUNTAS PARA VEREDAS m 33.66 6.62 222.83 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 33.66 222.83 100.00%
01.05.08 CURADO DE CONCRETO EN VEREDAS m 630.97 0.90 567.87 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 630.97 567.87 100.00%
01.06 CUNETA DE CONCRETO 142,095.60
01.06.01 TRAZO, NIVELES Y REPLANTEO m2 648.84 1.19 772.12 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 648.84 772.12 100.00%
01.06.02 EXCAVACION MANUAL m3 194.65 27.03 5,261.39 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 194.65 5,261.39 100.00%
01.06.03 NIVELACION Y COMPACTADO MANUAL m2 648.84 2.45 1,589.66 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 648.84 1,589.66 100.00%
01.06.04 SOLADO e=2" MEZCLA 1;12 m2 648.84 25.48 16,532.44 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 648.84 16,532.44 100.00%
01.06.05 ENCOFRADO Y DESENCOFRADO DE CUNETA (Hmax = 30 cm.) m2 1,108.88 36.83 40,840.05 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1108.88 40,840.05 100.00%
01.06.06 CONCRETO f'c=175 kg/cm2, PARA SARDINELES m3 129.77 416.71 54,076.46 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 129.77 54,076.46 100.00%
01.06.07 TARRAJEO CON IMPERMEABILIZANTE m2 973.26 17.09 16,633.01 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 973.26 16,633.01 100.00%
01.06.08 CURADO DE CONCRETO EN VEREDAS m 1,622.10 0.90 1,459.89 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1622.10 1,459.89 100.00%
01.06.09 SELLADO DE JUNTAS PARA VEREDAS m 744.80 6.62 4,930.58 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 744.80 4,930.58 100.00%
01.07 PAVIMENTOS 164,067.14
01.07.01 SUB BASE e = 0.20 m 12,154.73
01.07.01.01 TRAZO, NIVELES Y REPLANTEO m2 770.75 1.19 917.19 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 770.75 917.19 100.00%
01.07.01.02 MATERIAL GRANULAR PARA SUB BASE m3 154.15 54.00 8,324.10 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 154.15 8,324.10 100.00%
01.07.01.03 EXTENDIDO Y COMPACTADO DE MATERIAL DE LA SUB BASE m2 770.75 3.04 2,343.08 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 770.75 2,343.08 100.00%
01.07.01.04 RIEGO m2 770.75 0.74 570.36 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 770.75 570.36 100.00%
01.07.02 BASE e = 0.30 m 14,929.67
01.07.02.01 TRAZO, NIVELES Y REPLANTEO m2 770.75 1.19 917.19 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 770.75 917.19 100.00%
01.07.02.02 MATERIAL GRANULAR PARA BASE m3 231.23 48.00 11,099.04 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 231.23 11,099.04 100.00%
01.07.02.03 EXTENDIDO Y COMPACTADO DE MATERIAL DE LA BASE m2 770.75 3.04 2,343.08 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 770.75 2,343.08 100.00%
01.07.02.04 RIEGO m2 770.75 0.74 570.36 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 770.75 570.36 100.00%
01.07.03 LOSA DE RODADURA 136,982.74
01.07.03.01 TRAZO, NIVELES Y REPLANTEO m2 770.75 1.19 917.19 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 770.75 917.19 100.00%
01.07.03.02 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 437.40 54.11 23,667.71 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 437.40 23,667.71 100.00%
01.07.03.03 CONCRETO F'c = 210 KG/CM2 (PREMEZCLADO) m3 154.15 460.46 70,979.91 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 154.15 70,979.91 100.00%
01.07.03.04 FIBRA DE ACERO (REFUERZO CONCRETO) m3 154.15 144.18 22,225.35 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 154.15 22,225.35 100.00%
01.07.03.05 ACERO CORRUGADO 3/4" Fy = 4200 kg/cm2 Gª 60 (JUNTA TRANSVERSAL) kg 883.01 17.85 15,761.73 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 883.01 15,761.73 100.00%
01.07.03.06 SELLADO DE JUNTAS DE DILATACION e = 3/4", h = 0.05 m m 215.50 8.66 1,866.23 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 215.50 1,866.23 100.00%
01.07.03.07 CURADO DE LOSA DE CONCRETO m2 770.75 2.03 1,564.62 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 770.75 1,564.62 100.00%
01.08 MUROS DE CONCRETO CICLOPEO 462,554.43
01.08.01 LIMPIEZA DE OBRA m2 702.92 0.68 477.99 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 702.92 477.99 100.00%
01.08.02 TRAZO, NIVELES Y REPLANTEO m2 702.92 1.19 836.47 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 702.92 836.47 100.00%
01.08.03 EXCAVACION MANUAL DE TERRENO m3 1,404.73 27.03 37,969.85 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1404.73 37,969.85 100.00%
01.08.04 NIVELACION Y COMPACTADO MANUAL m2 702.92 2.45 1,722.15 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 702.92 1,722.15 100.00%
01.08.05 SOLADO DE 2" MEZCLA 1:12 m2 702.92 15.48 10,881.20 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 702.92 10,881.20 100.00%
01.08.06 ENCOFRADO Y DESENCOFRADO DE MUROS DE SOSTENIMIENTO m2 2,387.73 82.30 196,510.18 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2387.73 196,510.18 100.00%
01.08.07 CONCRETO F'C= 175 KG/CM +30% DE P.M m3 458.25 319.70 146,502.53 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 458.25 146,502.53 100.00%
01.08.08 DRENES DE PVC Ø=3" m 393.20 12.22 4,804.90 0.00 0.00 0.00% -
01.08.09 JUNTA DE DILATACION PARA MUROS 1"x0.05 m 1:4 m 159.50 9.00 1,435.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 159.50 1,435.50 100.00%
01.08.10 CURADO DE CONCRETO m2 2,387.73 2.03 4,847.09 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2387.73 4,847.09 100.00%
01.08.11 RELLENO Y COMPACTADO EN ZANJA CON MATERIAL PROPIO m3 755.19 21.40 16,161.07 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 755.19 16,161.07 100.00%
01.08.12 ACARREO MANUAL D = 25 m m3 844.42 23.16 19,556.77 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 844.42 19,556.77 100.00%
FORMATO - 13
Página 67

22.2.- VALORIZACION EXPEDIENTE DE OBRA MES DE FEBRERO

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
01.08.13 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=10 km m3 844.42 24.69 20,848.73 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 844.42 20,848.73 100.00%
01.09 SEÑALETICA 7,239.17
01.09.01 SEÑALIZACION HORIZONTAL 1,239.17
01.09.01.01 PINTADO DE SARDINELES m2 438.40 2.52 1,104.77 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 438.40 1,104.77 100.00%
01.09.01.02 SEÑALIZACION HORIZONTAL EN CRUCERO PEATONAL m2 21.00 6.40 134.40 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 21.00 134.40 100.00%
01.09.02 SEÑALIZACION VERTICAL 6,000.00
01.09.02.01 SEÑALIZACION INFORMATIVA DE CALLES und 32.00 150.00 4,800.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 32.00 4,800.00 100.00%
01.09.02.02 SEÑALIZACION PREVENTIVA DE CRUCE PEATONAL und 8.00 150.00 1,200.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.00 1,200.00 100.00%
01.10 VARIOS, LIMPIEZA Y JARDINERIA 79,011.84
01.10.01 SEMBRIO DE GRASS m2 2,043.45 36.30 74,177.24 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2043.45 74,177.24 100.00%
01.10.02 SUM Y COL PLANTAS ORNAMENTALES und 230.00 21.02 4,834.60 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 230.00 4,834.60 100.00%
02 REPOSICION DE INSTALACIONES DE AGUA Y DESAGUE 274,112.49
02.01 REPOSICION DE INSTALACIONES DE CONEXIONES DOMICILIARIAS DEAGUA 78,706.20
02.01.01 TRAZO, NIVELES Y REPLANTEO m2 240.96 1.19 286.74 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 240.96 286.74 100.00%
02.01.02 EXCAVACION DE ZANJAS MANUAL m3 240.96 27.03 6,513.15 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 240.96 6,513.15 100.00%
02.01.03 PERFILADO Y COMPACTADO m2 240.96 6.33 1,525.28 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 240.96 1,525.28 100.00%
02.01.04 CAMA DE ARENA PARA APOYO DE TUBERIA m 240.96 11.00 2,650.56 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 240.96 2,650.56 100.00%
02.01.05 RELLENO Y COMPACTADO EN ZANJA CON MATERIAL PROPIO m3 216.86 21.40 4,640.80 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 216.86 4,640.80 100.00%
02.01.06 RECONEXION DOMICILIARIAS DE AGUA und 141.00 442.30 62,364.30 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 141.00 62,364.30 100.00%
02.01.07 ACARREO MANUAL D = 25 m m3 31.32 23.16 725.37 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 31.32 725.37 100.00%
02.02 REPOSICION DE INSTALACIONES DE CONEXIONES DOMICILIARIAS DE DESAGUE 71,931.66
02.02.01 TRAZO, NIVELES Y REPLANTEO m2 240.96 1.19 286.74 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 240.96 286.74 100.00%
02.02.02 EXCAVACION DE ZANJAS MANUAL m3 240.96 27.03 6,513.15 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 240.96 6,513.15 100.00%
02.02.03 PERFILADO Y COMPACTADO m2 240.96 6.33 1,525.28 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 240.96 1,525.28 100.00%
02.02.04 CAMA DE ARENA PARA APOYO DE TUBERIA m 240.96 11.00 2,650.56 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 240.96 2,650.56 100.00%
02.02.05 RELLENO Y COMPACTADO EN ZANJA CON MATERIAL PROPIO m3 216.86 21.40 4,640.80 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 216.86 4,640.80 100.00%
02.02.06 RECONEXION DOMICILIARIAS DE DESAGUE und 144.00 386.04 55,589.76 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 144.00 55,589.76 100.00%
02.02.07 ACARREO MANUAL D = 25 m m3 31.32 23.16 725.37 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 31.32 725.37 100.00%
02.03 ENCIMADO DE BUZON 56,463.05
02.03.01 ENCIMADO DE BUZON und 51.20 542.25 27,763.20 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 51.20 27,763.20 100.00%
02.03.02 TAPA METALICA PARA BUZON und 61.44 467.12 28,699.85 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 61.44 28,699.85 100.00%
02.04 SISTEMA DE EVACUACION DE AGUAS PLUVIALES 44,511.58
02.04.01 SUMIDEROS 32,547.38
02.04.01.01 TRAZO, NIVELES Y REPLANTEO m2 44.70 1.19 53.19 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 44.70 53.19 100.00%
02.04.01.02 EXCAVACION MANUAL m3 24.59 27.03 664.67 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 24.59 664.67 100.00%
02.04.01.03 NIVELACION Y COMPACTADO MANUAL m2 44.70 2.45 109.52 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 44.70 109.52 100.00%
02.04.01.04 ACARREO MANUAL D = 25 m m3 31.96 23.16 740.19 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 31.96 740.19 100.00%
02.04.01.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=10 km m3 31.96 24.69 789.09 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 31.96 789.09 100.00%
02.04.01.06 SOLADOS PARA SUMIDEROS F'c = 100 KG/CM2 e = 2" m2 44.70 19.53 872.99 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 44.70 872.99 100.00%
02.04.01.07 ACERO CORRUGADO Fy = 4200 kg/cm2 Gª 60 kg 981.30 11.00 10,794.30 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 981.30 10,794.30 100.00%
02.04.01.08 ENCOFRADO Y DESENCOFRADO m2 59.36 51.54 3,059.41 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 59.36 3,059.41 100.00%
02.04.01.09 CONCRETO f'c=175 kg/cm2 m3 20.04 416.71 8,350.87 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 20.04 8,350.87 100.00%
02.04.01.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:5 e = 1.5 cm m2 79.82 31.17 2,487.99 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 79.82 2,487.99 100.00%
02.04.01.11 REJILLA PARA SUMIDERO und 21.00 212.53 4,463.13 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 21.00 4,463.13 100.00%
FORMATO - 13
Página 68

22.2.- VALORIZACION EXPEDIENTE DE OBRA MES DE FEBRERO

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
02.04.01.12 CURADO DE CONCRETO m2 79.82 2.03 162.03 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 79.82 162.03 100.00%
02.04.02 TUBERIA PARA DRENAJE PLUVIAL 11,964.20
02.04.02.01 TRAZO Y REPLANTEO m 50.40 58.59 2,952.94 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 50.40 2,952.94 100.00%
02.04.02.02 EXCAVACION MANUAL m3 35.28 27.03 953.62 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 35.28 953.62 100.00%
02.04.02.03 NIVELACION Y COMPACTADO MANUAL m2 50.40 2.45 123.48 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 50.40 123.48 100.00%
02.04.02.04 CAMA DE ARENA PARA APOYO DE TUBERIA m 50.40 11.00 554.40 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 50.40 554.40 100.00%
02.04.02.05 SUMINISTRO Y COLOCACION DE TUBERIA PVC U 200 mm SN-4 C/ANILLO NTP ISO 4435 m 63.00 104.30 6,570.90 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 63.00 6,570.90 100.00%
02.04.02.06 RELLENO Y COMPACTADO EN ZANJA CON MATERIAL PROPIO m3 30.24 21.40 647.14 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 30.24 647.14 100.00%
02.04.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=10 km m3 6.55 24.69 161.72 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 6.55 161.72 100.00%
02.05 REHUBICACION DE POSTES 22,500.00
02.05.01 REUBICACION DE POSTES glb 5.00 4,500.00 22,500.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5.00 22,500.00 100.00%
03 MITIGACION DE IMPACTOS CULTURALES 13,926.17
03.01 PLAN DE MONITOREO ARQUEOLOGICO 13,926.17
03.01.01 APROBACION DE EXPEDIENTE DE PMA 1,932.60
03.01.01.01 APROBACION DEL PLAN DE MONITOREO ARQUEOLOGICO Exp 1.00 1,932.60 1,932.60 0.00 0.00 0.00% 1.00 1,932.60 100.00% 1.00 1,932.60 100.00% 0.00 0.00 0.00%
03.01.02 SEGURIDAD Y SALUD 1,727.31
03.01.02.01 SEÑALIZACION TEMPORAL EN EL TRABAJO m 1,677.00 1.03 1,727.31 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1677.00 1,727.31 100.00%
03.01.03 CONTROL Y MONITOREO ARQUEOLOGICO 4,283.31
03.01.03.01 CHARLA DE INDUCCIÓN Cha 3.00 19.11 57.33 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 57.33 100.00%
03.01.03.02 MONITOREO DE ZANJAS m3 3,603.00 1.16 4,179.48 0.00 0.00 0.00% 444.21 515.28 12.33% 444.21 515.28 12.33% 3158.79 3,664.20 87.67%
03.01.03.03 RECUPERACIÓN DEL MATERIAL ARQUEOLÓGICO bol 5.00 9.30 46.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5.00 46.50 100.00%
03.01.04 REGISTRO ARQUEOLOGICO 1,135.00
03.01.04.01 REGISTRO FOTOGRAFICO und 200.00 0.55 110.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 200.00 110.00 100.00%
03.01.04.02 REGISTRO GRAFICO ARQUEOLOGICO (PLANTAS, PERFILES) Lam 150.00 6.50 975.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 150.00 975.00 100.00%
03.01.04.03 REGISTRO ESCRITO Ficha 50.00 1.00 50.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 50.00 50.00 100.00%
03.01.05 ANALISIS DE MATERIAL CULTURAL 276.75
03.01.05.01 LAVADO DE MATERIAL CULTURAL bls 5.00 8.90 44.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5.00 44.50 100.00%
03.01.05.02 MARCADO Y CODIFICADO DE MATERIAL CULTURAL bls 5.00 3.03 15.15 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5.00 15.15 100.00%
03.01.05.03 TIPOLOGIA Y SERIACIÓN DE MATERIAL CULTURAL bls 5.00 4.25 21.25 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5.00 21.25 100.00%
03.01.05.04 REGISTRO GRAFICO DE MATERIAL CULTURAL Lam 5.00 26.53 132.65 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5.00 132.65 100.00%
03.01.05.05 EMBALAJE DE MATERIAL CULTURAL cja 1.00 40.00 40.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 40.00 100.00%
03.01.05.06 REGISTRO FOTOGRAFICO DE MATERIAL CULTURAL EN GABINETE und 40.00 0.58 23.20 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 40.00 23.20 100.00%
03.01.06 PLAN DE CONTINGENCIA 3,500.00
03.01.06.01 PLAN DE CONTINGENCIA glb 1.00 3,500.00 3,500.00 0.00 0.00 0.00% 1.00 3,500.00 100.00% 1.00 3,500.00 100.00% 0.00 0.00 0.00%
03.01.07 INFORME FINAL DEL PMA 1,071.20 0.00
PRESENTACION DE INFORME FINAL DEL PLAN DE MONITOREO ARQUEOLOGICO ANTE LA 0.00
03.01.07.01 Exp 1.00 1,071.20 1,071.20 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 1,071.20 100.00%
DDC
04 COVID - 19 17,192.18
04.01 ELABORACION DEL PLAN DE VIGILANCIA, PREVENCION Y CONTROL DEL COVID - 19 und 1.00 2,500.00 2,500.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 2,500.00 100.00%
04.02 CAPACITACION DE SALUD Y SEGURIDAD PARA COVID - 19 und 1.00 300.00 300.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 300.00 100.00%
04.03 IMPLEMENTOS DE PROTECCION PERSONAL PARA COVID - 19 glb 1.00 3,564.00 3,564.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 3,564.00 100.00%
04.04 PRUEBAS RAPIDAS PARA DESCARTE DE COVID - 19 und 90.00 75.00 6,750.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 90.00 6,750.00 100.00%
04.05 EQUIPOS DE DESINFECCION glb 1.00 3,691.00 3,691.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 3,691.00 100.00%
04.06 CONSTRUCCION DE ZONAS DE DESINFECCION m2 1.00 124.06 124.06 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 124.06 100.00%
FORMATO - 13
Página 69

22.2.- VALORIZACION EXPEDIENTE DE OBRA MES DE FEBRERO

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
04.07 CONSTRUCCION DE VESTIDORES m2 1.00 124.06 124.06 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 124.06 100.00%
04.08 CONSTRUCCION DE COMEDOR m2 1.00 124.06 124.06 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 124.06 100.00%
04.09 SEÑALIZACION PREVENTIVA DE COVID - 19 und 1.00 15.00 15.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 15.00 100.00%
05 SEGURIDAD Y SALUD 31,120.73
05.01 EQUIPOS DE PROTECCION INDIVIDUAL jgo 10.00 256.00 2,560.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 10.00 2,560.00 100.00%
ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE SEGURIDAD Y SALUD EN EL 0.00
05.02 glb 1.00 3,400.00 3,400.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 3,400.00 100.00%
TRABAJO
05.03 CAPACITACION EN SEGURIDAD Y SALUD und 8.00 2,200.00 17,600.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.00 17,600.00 100.00%
05.04 RESPUESTAS ANTE EMERGENCIA EN SEGURIDAD Y SALUD jgo 1.00 1,604.50 1,604.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 1,604.50 100.00%
05.05 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 3,316.23 3,316.23 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 3,316.23 100.00%
05.06 SEÑALES PARA DESVIO DE TRANSITO glb 1.00 1,440.00 1,440.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 1,440.00 100.00%
05.07 SEÑALIZACION DE SEGURIDAD glb 1.00 1,200.00 1,200.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 1,200.00 100.00%
06 MITIGACION DE IMPACTO AMBIENTAL 22,854.13
06.01 RIEGO DURANTE EL PROCESO CONSTRUCTIVO m2 5,916.98 0.71 4,201.06 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5916.98 4,201.06 100.00%
06.02 ACONDICIONAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTE m3 50.00 31.06 1,553.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 50.00 1,553.00 100.00%
06.03 LIMPIEZA FINAL DE OBRA m2 5,916.98 2.89 17,100.07 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5916.98 17,100.07 100.00%
07 TRABAJOS COMPLEMENTARIOS 9,837.53
07.01 CONTROL DE CALIDAD EN OBRA 9,600.00
07.01.01 PRUEBAS DE COMPACTACION EN CAMPO und 16.00 350.00 5,600.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 16.00 5,600.00 100.00%
07.01.02 PRUEBAS DE COMPRESION SIMPLE DEL CONCRETO und 12.00 250.00 3,000.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 12.00 3,000.00 100.00%
07.01.03 DISEÑO DE MEZCLAS DE CONCRETO PRU 2.00 500.00 1,000.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2.00 1,000.00 100.00%
07.02 PLACA RECORDATORIA 237.53
07.02.01 INSTALACION Y SUMINISTRO DE PLACA RECORDATORIA und 1.00 237.53 237.53 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 237.53 100.00%
COSTO DIRECTO S/. 1,834,283.19 0.00 0.00% 16,976.48 0.93% 16,976.48 0.93% 1,817,306.71 99.07%
GASTOS GENERALES 13.31% 244100.23 50,972.18 20.88% 0.00 0.00% 50,972.18 20.88% 193,128.05 79.12%
GASTOS DE INSPECCION 4.09% 74,951.99 0.00 0.00% 0.00 0.00% 0.00 0.00% 74,951.99 100.00%
LIQUIDACION DE OBRA 1.01% 18,500.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 18,500.00 100.00%
EXPEDIENTE TECNICO 1.50% 27,490.50 27,490.50 100.00% 0.00 0.00% 27,490.50 100.00% 0.00 0.00%
PRESUPUESTO TOTAL S/. 2,199,325.91 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,199,325.91 100.00%
FORMATO - 13

5.2.- VALORIZACION EXPEDIENTE DE OBRA N° 02 - MES DE JUNIO 2019


OBRA : #VALUE! RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ

SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DEL MES DE JUNIO - 2019 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO N°
} DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO  MES 01
SEMANAS
Unid.Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Sem. 01
MEJRAMIENTO Y AMPLIACION DEL SISTEMA DE SANEAMIENTO
01 BASICO
01.01 OBRAS PROVICIONALES
S/. 780.73 S/. 195.18
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60x2.40M Und 1.00 780.73 780.73 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 780.73 100.00%
N° sem = 4 .
S/. 22543.50 S/. 5635.88
01.01.02 FLETE TERRESTE DE MATERIALES Y HERRAMIENTAS GLB 1.00 32205.00 32,205.00 0.30 9,661.50 30.00% - 0.00 0.00% 0.30 9,661.50 30.00% 0.70 22,543.50 70.00%
N° sem = 4 .
S/. 2220.75 S/. 555.19
01.01.03 FLETE RURAL DE MATERIALES Y HERRAMIENTAS GLB 1.00 10575.00 10,575.00 0.79 8,354.25 79.00% - 0.00 0.00% 0.79 8,354.25 79.00% 0.21 2,220.75 21.00%
N° sem = 4 .
01.01.04 SEGURIDAD Y SALUDA LABORAL
S/. 1800.00 S/. 450.00
ELABORACION,
01.01.04.01 IMPLEMENTACIO Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD
GLB LABORAL
1.00 1800.00 1,800.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 1,800.00 100.00%
N° sem = 4 .
S/. 6720.00 S/. 1680.00
01.01.04.02 EQUIPO DE PROTECICION INDIVIDUAL Und 48.00 240.00 11,520.00 20.00 4,800.00 41.67% - 0.00 0.00% 20.00 4,800.00 41.67% 28.00 6,720.00 58.33%
N° sem = 4 .
S/. 787.95 S/. 196.99
01.01.04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD Und 4.00 262.65 1,050.60 1.00 262.65 25.00% - 0.00 0.00% 1.00 262.65 25.00% 3.00 787.95 75.00%
N° sem = 4 .
S/. 720.00 S/. 180.00
01.01.04.04 CAPACITACION EN SEGURIDAD Y SALUDA LABORAL TALL 1.00 800.00 800.00 0.10 80.00 10.00% - 0.00 0.00% 0.10 80.00 10.00% 0.90 720.00 90.00%
N° sem = 4 .
S/. 1944.00 S/. 486.00
01.01.04.05 PLAN DE CONTIGENCIAS EN SEGURIDAD Y SALUD LABORAL GLB 1.00 2160.00 2,160.00 0.10 216.00 10.00% - 0.00 0.00% 0.10 216.00 10.00% 0.90 1,944.00 90.00%
N° sem = 4 .
SUB SISTEMA DE SANEAMIENTO BASICO ANEXO
01.02 HUAYLLABAMBA-CALLIPATA ALTA
LINEA DE CONDUCCION CON TUBERIA PVC SAP Q=1,
01.02.01 1.5"(C1,C2,C2-CR-RESERVORIO)-L=1323.31 ml
01.02.01.01 LIMPIEZA DEL TERRENO MANUAL ML 1323.31 0.22 291.13 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1323.31 291.13 100.00%

01.02.01.02 TRAZO Y REEPLAMTEO PRELIMINAR KM 1.32 452.65 597.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.32 597.50 100.00%

01.02.01.03 CONTROL TOPOOGRAFICO DURANTE LA EJECUCION ML 1323.31 0.85 1,124.81 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1323.31 1,124.81 100.00%

01.02.01.04 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 487.54 10.73 5,231.30 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 487.54 5,231.30 100.00%

01.02.01.05
EXCAVACION MANUAL ZANJA EN ROCA SUELTA: PERFORACION Y VOLADURA
M3 33.37 24.40 814.23 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 33.37 814.23 100.00%

01.02.01.06EXCAVACION MANUAL ZANJA EN ROCA FINA : PERFORACION Y VOLADURA


M3 20.88 34.61 722.66 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 20.88 722.66 100.00%

01.02.01.07 LIMPIEZA DE MATERIAL RESULTANTE DE LA VOLADURA M3 68.27 12.90 880.68 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 68.27 880.68 100.00%

01.02.01.08 REFINE Y NIVELACION FONDO ZANJA EN MATERIAL COMPACTO ML 1218.86 0.28 341.28 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1218.86 341.28 100.00%

01.02.01.09 REFINE Y NIVELACION FONDO ZANJA EN ROCA SUELTA ML 84.34 0.78 65.79 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 84.34 65.79 100.00%

01.02.01.10 REFINE Y NIVELACION FONDO ZANJA EN ROCA FIJA ML 52.21 1.18 61.61 0.00 0.00 0.00% 444.21 524.17 850.82% 444.21 524.17 ### -392.00 -462.56 -750.81%

01.02.01.11 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 66.17 6.44 426.13 0.00 0.00 0.00% 30.00 193.20 45.34% 30.00 193.20 45.34% 36.17 232.93 54.66%

01.02.01.12 RELLENO COMPACTO CON MATERIAL SELECCIONADO M3 238.20 11.45 2,727.39 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 238.20 2,727.39 100.00%

01.02.01.13 RELLENO COMPACTO CON MATERIAL PROPIO M3 486.32 5.81 2,825.52 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 486.32 2,825.52 100.00%

01.02.01.14 SUMINISTRO E INSTALACION TUB.PVC SAP Q 1.5" C-10 ML 1022.08 7.80 7,972.22 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1022.08 7,972.22 100.00%
01.02.01.14 SUMINISTRO E INSTALACION TUB.PVC SAP Q 1.5" C-10 ML 1022.08 7.80 7,972.22 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1022.08 7,972.22 100.00%

01.02.01.15 SUMINISTRO E INSTALACION TUB.PVC Q 1" C-10 ML 367.40 4.07 1,495.32 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 367.40 1,495.32 100.00%

01.02.01.16 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 193.98 193.98 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 193.98 100.00%

01.02.01.17 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 1323.31 0.45 595.49 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1323.31 595.49 100.00%

01.02.02 OBRAS DE ARTE DE CONDUCCION


01.02.02.01 MEJORAMIENTO CAMARAS DE CAPACITACION MANANTE C-01 (03 UNID.)
01.02.02.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 74.82 0.45 33.67 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 74.82 33.67 100.00%
01.02.02.01.02 TRAZO, NIVELACION Y REEPLANTEO M2 24.38 1.89 46.08 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 24.38 46.08 100.00%
01.02.02.01.03 EXCAVACION MANUAL PARA EXTRUTURAS EN MATERIAL COMPA M3 15.51 13.80 214.04 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 15.51 214.04 100.00%
01.02.02.01.04 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 13.89 3.50 48.62 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 13.89 48.62 100.00%
01.02.02.01.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 2.30 61.07 140.46 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2.30 140.46 100.00%
01.02.02.01.06 FILTRO CON PIEDRA PEQUEÑA TAM.MAX.2" M3 0.38 56.00 21.28 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.38 21.28 100.00%
01.02.02.01.07 FILTRO CON GRAVA SELECCIONADA DE 3/4" -1" M3 0.82 114.50 93.89 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.82 93.89 100.00%
01.02.02.01.08 FILTRO CON GRAVA SELECCIONADA DE 1/2" M3 2.80 56.58 158.42 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2.80 158.42 100.00%
01.02.02.01.09 TRARRAJEO E IMPERMEABILIZACION MEZCLA C.A-1:5,E=1.5 CM M2 8.67 23.06 199.93 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.67 199.93 100.00%
01.02.02.01.10 PINTURA ESMALTE EN EXTERIORES M2 4.38 7.14 31.27 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.38 31.27 100.00%
01.02.02.01.11 INSTALACION TUBERIAS DE INGRESO PVC Q=2"- PERFORADO Und 3.00 59.60 178.80 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 178.80 100.00%
01.02.02.01.12 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q 1" Und 1.00 138.31 138.31 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 138.31 100.00%
01.02.02.01.13 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q=1.50" Und 2.00 138.66 277.32 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2.00 277.32 100.00%
01.02.02.01.14 INSTALCION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 3.00 172.78 518.34 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 518.34 100.00%
01.02.02.01.15 INSTALACION TAPA METALICA DE INSPECCION 0.75x0.75 M Und 3.00 266.25 798.75 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 798.75 100.00%
01.02.02.01.16 INSTALACION TAPA METALICA CAJA VALVULAS 0.56x0.40 M Und 3.00 177.50 532.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 532.50 100.00%
01.02.02.01.17. CERCO PERIMETRICO
01.02.02.01.17.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 270.00 0.45 121.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 270.00 121.50 100.00%
01.02.02.01.17.02 TRAZO, NIVELACION Y REEPLAMTEO M2 108.00 1.89 204.12 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 108.00 204.12 100.00%
01.02.02.01.17.03 EXCAVACION PARA ESTRUCTURAS EN MATERIA COMPACTO M3 6.24 13.80 86.11 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 6.24 86.11 100.00%
01.02.02.01.17.04 CONCRETO F C=175KG/CM° + 30% P.M. (SIN MEZCLADORA) M3 6.05 246.24 1,489.75 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 6.05 1,489.75 100.00%
01.02.02.01.17.05 SUMINISTRO E INSTALACION DE RODILLOS DE MADERA L=2.1mx4"Und 60.00 14.10 846.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 60.00 846.00 100.00%
01.02.02.01.17.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 1134.00 1.33 1,508.22 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1134.00 1,508.22 100.00%
01.02.02.01.17.07 INSTALACION DE PUERTA DE INGRSO RUSTICO (0.90x1.55M) Und 3.00 66.87 200.61 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 200.61 100.00%
01.02.02.02 MEJORAMIENTO DE CAMARA DE REUNION (01 UND)
01.02.02.02.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 8.00 20.43 163.44 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.00 163.44 100.00%
01.02.02.02.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 4.20 23.06 96.85 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.20 96.85 100.00%
01.02.02.02.03 PINTURA ESMALTE EN EXTERIORES M2 3.19 7.14 22.78 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.19 22.78 100.00%
01.02.02.02.04 INSTALACION DE ACCESORIOS DE INGRESO A CAJA DE REUNIONUnd 1.00 198.50 198.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 198.50 100.00%
01.02.02.02.05 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q=1.50" Und 1.00 138.66 138.66 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 138.66 100.00%
01.02.02.02.06 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1.00 172.78 172.78 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 172.78 100.00%
01.02.02.02.07 INSTALACION TAPA METALICA DE INSPECCION 0.75x0.75 M Und 1.00 266.25 266.25 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 266.25 100.00%
01.02.02.02.08 INSTALACION TAPA METALICA CAJA VALVULAS 0.56x0.40 M Und 1.00 177.50 177.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 177.50 100.00%
01.02.02.03 MEJRAMIENTO CAMARA ROMPE PRESION T-VI (04 UNID) LINEA DE CONDUCTO
01.02.02.03.01 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.02.03.01.01 TARRAJEOS EN INTERIORES Y ESTERIORES MEZCLA C;A 1.5, E=1.M2 15.94 20.43 325.65 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 15.94 325.65 100.00%
01.02.02.03.01.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 10.56 23.06 243.51 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 10.56 243.51 100.00%
01.02.02.03.02 PINTURA
01.02.02.03.02.01 PINTURA ESMALTE EN EXTERIORES M2 10.92 7.14 77.97 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 10.92 77.97 100.00%
01.02.02.03.03 VALVULAS Y ACCESORIOS
01.02.02.03.03.01 INSTALACION INGRESO CON VALVULAS DE Q 1.50" Und 4.00 139.97 559.88 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.00 559.88 100.00%
01.02.02.03.03.02 INSTALACION DE SALIDA CON TUBERIA PVC SAP Q 1.50" Und 4.00 81.75 327.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.00 327.00 100.00%
01.02.02.03.03.03 INSTALACION DE LIMPIA Y REBOSEO Q=2" Und 4.00 172.78 691.12 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.00 691.12 100.00%
01.02.02.03.04 VARIOS
01.02.02.03.04.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 1.14 61.07 69.62 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.14 69.62 100.00%
01.02.02.04 RESERVORIO RECTANGULAR APOYADO CAP=12.00 M3 (01 UND)
01.02.02.04.01 TRABAJOS PRELIMINARES
01.02.02.04.01.01 LIMPIEZA DEL TERRENO MANUAL M2 38.90 0.45 17.51 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 38.90 17.51 100.00%
01.02.02.04.01.02 TRAZO DE NIVELACION Y REEMPLANTEO M2 15.70 1.89 29.67 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 15.70 29.67 100.00%
01.02.02.04.02 MOVIMIENTO DE TIERRAS
01.02.02.04.02.01 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 13.18 13.80 181.88 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 13.18 181.88 100.00%
01.02.02.04.02.02 EXAVACION MANUAL PARA ESTRUCTURAS EN ROCAS SUELTAS M3 30.74 47.06 1,446.62 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 30.74 1,446.62 100.00%
01.02.02.04.02.03 PERFILADO Y CONPACTADO EN FUNDACIONES M3 37.60 1.72 64.67 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 37.60 64.67 100.00%
01.02.02.04.02.04 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.60 6.44 3.86 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.60 3.86 100.00%
01.02.02.04.02.05 RELLENO COMPACTADO CON MATERIAL SELECCIONADO M3 1.80 11.45 20.61 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.80 20.61 100.00%
01.02.02.04.02.06 RELLENO COMPACTADO CON MATERIAL PROPIO M3 20.44 5.81 118.76 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 20.44 118.76 100.00%
01.02.02.04.02.07 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 30.46 3.50 106.61 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 30.46 106.61 100.00%
01.02.02.04.03 OBRAS DE CONCRETO SIMPLE
01.02.02.04.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 1.30 212.44 276.17 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.30 276.17 100.00%
01.02.02.04.03.01 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.05 341.89 17.09 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.05 17.09 100.00%
01.02.02.04.04 OBRAS DE CONCRETO ARMADO
01.02.02.04.04.01 CONCRETO FC=200KG/M2 (SIN MEZCLADORA) M3 13.19 371.95 4,906.02 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 13.19 4,906.02 100.00%
01.02.02.04.04.02 ENCOFRADO Y DESENCOFRADO M2 76.02 20.03 1,522.68 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 76.02 1,522.68 100.00%
01.02.02.04.04.03 ACERO FY=4200 KG/M2 KG 943.68 4.71 4,444.73 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 943.68 4,444.73 100.00%
01.02.02.04.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.02.04.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 44.57 20.43 910.57 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 44.57 910.57 100.00%
01.02.02.04.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 28.60 23.06 659.52 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 28.60 659.52 100.00%
01.02.02.04.05.03 MORTERO 1.5 E=2.5 CM. PARA PENDIENTES DE FONDO M2 7.10 20.45 145.20 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 7.10 145.20 100.00%
01.02.02.04.06 PINTRA
01.02.02.04.06.01 PINTURA ESMALTE EN EXTERIORES M2 22.50 7.14 160.65 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 22.50 160.65 100.00%
01.02.02.04.07 VARIOS
01.02.02.04.07.01 INSTALACION INGRESO Y BY PASS CON TUB. PVC SAP Q=1" Und 1.00 270.37 270.37 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 270.37 100.00%
01.02.02.04.07.02 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q=1" Und 1.00 193.07 193.07 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 193.07 100.00%
01.02.02.04.07.03 INSTALACION DE SISTEMA DE LIMPI Y REBOSE Q=2" Und 1.00 285.86 285.86 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 285.86 100.00%
01.02.02.04.07.04 SUMINISTRO E INSTALACION DE ESCALERAS H=1.10 M.E HIPOCL Und 1.00 463.00 463.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 463.00 100.00%
01.02.02.04.07.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 2.99 61.07 182.60 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2.99 182.60 100.00%
01.02.02.04.08 CERCO PERIMETRICO
01.02.02.04.08.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 30.00 0.45 13.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 30.00 13.50 100.00%
01.02.02.04.08.02 TRAZO NIVELACION Y REPLANTEO M2 12.00 1.89 22.68 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 12.00 22.68 100.00%
01.02.02.04.08.03 EXCAVACION PARA ESTRUCTURAS EN MATERIA COMPACTO M3 1.46 13.80 20.15 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.46 20.15 100.00%
01.02.02.04.08.04 CONCRETO F.C=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 1.41 246.24 347.20 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.41 347.20 100.00%
01.02.02.04.08.05 SUMINISTRO E INSTALACION DE ROLLIZOS DE MADERA L=2.10Mx4Und 14.00 14.10 197.40 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 14.00 197.40 100.00%
01.02.02.04.08.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 252.00 1.33 335.16 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 252.00 335.16 100.00%
01.02.02.04.08.07 INSTALACION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) Und 1.00 66.87 66.87 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 66.87 100.00%
01.02.03 LINEA DE ADUCCION Y RED DE DISTRIBUCION CON TUBERIA PVC SAP
01.02.03.01 REDES DE DISTRIBUCION AGUA POTABLE
01.02.03.01.01 LIMPIEZA DEL TERRENO MANUAL ML 8688.26 0.22 1,911.42 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8688.26 1,911.42 100.00%
01.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR KM 8.69 452.65 3,933.53 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.69 3,933.53 100.00%
01.02.03.01.03 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 8688.26 0.85 7,385.02 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8688.26 7,385.02 100.00%
01.02.03.01.04 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 3475.30 10.73 37,289.97 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3475.30 37,289.97 100.00%
01.02.03.01.05 REFINE Y NIVELACION FONDO ZANJA EN MATRIAL COMPACTO ML 8688.26 0.28 2,432.71 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8688.26 2,432.71 100.00%
01.02.03.01.06 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 434.41 6.44 2,797.60 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 434.41 2,797.60 100.00%
01.02.03.01.07 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 1563.89 11.45 17,906.54 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1563.89 17,906.54 100.00%
01.02.03.01.08 RELLENO COMPACTO CON MATERIAL PROPIO M3 1251.11 5.81 7,268.95 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1251.11 7,268.95 100.00%
01.02.03.01.09 SUMINISTRO E INSTALACION TUB,PVC,SAP Q 3/4" C-10 ML 3397.87 4.23 14,372.99 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3397.87 14,372.99 100.00%
01.02.03.01.10 SUMINISTRO E INSTALACION TUB,PVC,SAP Q 3/4" C-15 ML 909.74 8.22 7,478.06 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 909.74 7,478.06 100.00%
01.02.03.01.11 SUMINISTRO E INSTALACION TUB,PVC,SAP Q 1" C-10 ML 3867.32 4.07 15,739.99 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3867.32 15,739.99 100.00%
01.02.03.01.12 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 1.5" C-10 ML 673.16 7.80 5,250.65 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 673.16 5,250.65 100.00%
01.02.03.01.13 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 2" C-10 ML 274.59 8.46 2,323.03 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 274.59 2,323.03 100.00%
01.02.03.01.14 SUMINISTRO E INSTALACION DE ACCESORIOS PVC SAP 1"Y 2" (YIGLB 1.00 1138.17 1,138.17 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 1,138.17 100.00%
01.02.03.01.15 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 8688.26 0.45 3,909.72 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8688.26 3,909.72 100.00%
01.02.04 OBRA DE ARTE RED DE DISTRIBUCION 0.00
01.02.04.01 CAMARA DE ROMPE PRESIONES Q 2" TIPO -VIP (01 UNID)
01.02.04.01.01 TRABAJOS PRELIMINARES
01.02.04.01.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 11.57 0.45 5.21 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 11.57 5.21 100.00%
01.02.04.01.01.02 TRAZO DE NIVELACION Y REEMPLANTEO M2 3.39 1.89 6.41 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.39 6.41 100.00%
01.02.04.01.02 MOVIMIENTO DE TIERRAS
01.02.04.01.02.01 ESCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 8.31 13.80 114.68 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.31 114.68 100.00%
01.02.04.01.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 3.37 1.72 5.80 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.37 5.80 100.00%
01.02.04.01.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.25 6.44 1.61 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.25 1.61 100.00%
01.02.04.01.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 0.90 11.45 10.31 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.90 10.31 100.00%
01.02.02.04.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 5.10 5.81 29.63 0.00 0.00 0.00% 1.00 5.81 19.61% 1.00 5.81 19.61% 4.10 23.82 80.39%
01.02.04.01.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 5.29 3.50 18.52 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5.29 18.52 100.00%
01.02.04.01.03 OBRAS DE CONCRETO SIMPLE
01.02.04.01.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.09 212.44 19.12 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.09 19.12 100.00%
01.02.04.01.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.06 341.89 20.51 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.06 20.51 100.00%
01.02.04.01.04 OBRAS DE CONCRETO ARMADO
01.02.04.01.04.01 CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 1.10 371.95 409.15 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.10 409.15 100.00%
01.02.04.01.04.02 ENCOFRADO Y DESENCOFRADO M2 12.45 20.03 249.37 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 12.45 249.37 100.00%
01.02.04.01.04.03 ACERO FY=4200 KG/CM2 KG 79.04 4.71 372.28 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 79.04 372.28 100.00%
01.02.04.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.01.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 5.18 20.43 105.83 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 5.18 105.83 100.00%
01.02.04.01.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 3.30 23.06 76.10 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.30 76.10 100.00%
01.02.04.01.06 PINTURA
01.02.04.01.06.01 PINTURA ESMALTE EN EXTERIORES M2 3.33 7.14 23.78 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.33 23.78 100.00%
01.02.04.01.07 VALVULAS Y ACCESORIOS
01.02.04.01.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 1 373.37 373.37 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 373.37 100.00%
01.02.04.01.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 1 84.5 84.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 84.50 100.00%
01.02.04.01.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1 172.78 172.78 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 172.78 100.00%
01.02.04.01.08 VARIOS
01.02.04.01.08.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 0.37 61.07 22.60 0.00 0.00 0.00% 1.00 61.07 270.27% 1.00 61.07 ### -0.63 -38.47 -170.27%
01.02.04.02 CAMARA DE ROMPE PRESIONES Q 1.50" TIPO -VIP (01 UNID)
01.02.04.02.01 TRABAJOS PRELIMINARES
01.02.04.02.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 11.57 0.45 5.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.01.02 TRAZO NIVELACION Y REPLANTEO M2 3.39 1.89 6.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02 MOVIMIENTO DE TIERRAS
01.02.04.02.02.01 ESCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 8.31 13.80 114.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 3.37 1.72 5.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.25 6.44 1.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 0.90 11.45 10.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 5.10 5.81 29.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 5.29 3.50 18.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.03 OBRAS DE CONCRETO SIMPLE
01.02.04.02.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.09 212.44 19.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.06 341.89 20.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.04 OBRAS DE CONCRETO ARMADO
01.02.04.02.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 1.10 371.95 409.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.04.02 ENCOFRADO Y DESENCOFRADO M2 12.45 20.03 249.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.04.03 ACERO FY=4200 KG/M2 KG 79.04 4.71 372.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.02.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 5.18 20.43 105.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 3.3 23.06 76.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.06 PINTURA
01.02.04.02.06.01 PINTURA ESMALTE EN EXTERIORES M2 3.33 7.14 23.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.07 VALVULAS Y ACCESORIOS
01.02.04.02.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 1.00 290.97 290.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 1.00 81.75 81.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1.00 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.08 VARIOS
01.02.04.02.08.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 0.37 61.07 22.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03 CAMARA ROMPE PRESIONES Q 1" TIPO - VII (11 UNID9
01.02.04.03.01 TRABAJOS PRELIMINARES
01.02.04.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 127.27 0.45 57.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.01.02 TRAZO NIVELACION Y REPLANTEO M2 37.29 1.89 70.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02 MOVIMIENTO DE TIERRAS
01.02.04.03.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 91.42 13.80 1,261.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 37.03 1.72 63.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 2.75 6.44 17.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 9.90 11.45 113.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 56.09 5.81 325.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 58.19 3.5 203.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.03 OBRAS DE CONCRETO SIMPLE
01.02.04.03.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 1.04 212.44 220.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.64 341.89 218.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.04 OBRAS DE CONCRETO ARMADO
01.02.04.03.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 12.08 371.95 4,493.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.04.02 ENCOFRADO Y DESENCOFRADO M2 136.92 20.03 2,742.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.04.03 ACERO FY=4200 KG/M2 KG 869.44 4.71 4,095.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.03.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 57.02 20.43 1,164.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 36.30 23.06 837.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.06 PINTURA
01.02.04.03.06.01 PINTURA ESMALTE EN EXTERIORES M2 36.63 7.14 261.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.07 VALVULAS Y ACCESORIOS
01.02.04.03.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 11.00 267.84 2,946.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 11.00 45.76 503.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 11.00 172.78 1,900.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.08 VARIOS
01.02.04.03.08.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 4.11 61.07 251.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04 CAMARA ROMPE PRESIONES Q 1" TIPO - VII (03UNID9
01.02.04.04.01 TRABAJOS PRELIMINARES
01.02.04.04.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 34.71 0.45 15.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.01.02 TRAZO NIVELACION Y REPLANTEO M2 10.17 1.89 19.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02 MOVIMIENTO DE TIERRAS
01.02.04.04.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 24.93 13.80 344.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 10.10 1.72 17.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.75 6.44 4.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 2.7 11.45 30.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 15.3 5.81 88.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 15.87 3.50 55.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.03 OBRAS DE CONCRETO SIMPLE
01.02.04.04.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.28 212.44 59.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.18 341.89 61.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.04 OBRAS DE CONCRETO ARMADO
01.02.04.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 3.29 371.95 1,223.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02 ENCOFRADO Y DESENCOFRADO KG 37.34 20.03 747.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.03 ACERO FY=4200 KG/M2 M2 237.12 4.71 1,116.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 15.55 20.43 317.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 9.90 23.06 228.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06 PINTURA
01.02.04.06.01 PINTURA ESMALTE EN EXTERIORES M2 9.99 7.14 71.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07 VALVULAS Y ACCESORIOS
01.02..04.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 3.00 237.34 712.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 3.00 51.98 155.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 3.00 172.78 518.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08 VARIOS
01.02.04.08.01 ENCOFRADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"6" M3 1.12 61.07 68.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05 VALVULA DE CONTROL DE Q 2" RED DE DISTRIBUCION (01 UNID)
01.02.04.05.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.02 TRAZO NIVELACION Y REPLANTEO M3 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M2 1.01 13.8 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.04 PERFILADO Y CONPACTADO EN FUNDACIONES M3 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.10 ENCOFRADO Y DESENCOFRADO M3 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 1.49 20.43 30.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (CUnd 1.00 168.19 168.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06 VALVULA DE CONTROL DE Q 1.50" RED DE DISTRIBUCION (01 UNID)
01.02.04.06.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.02 TRAZO NIVELACION Y REPLANTEO M2 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAM3 1.01 13.80 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.06 RELLENO COMPACTODO CON MATERIAL SELECCIONADO M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.10 ENCOFRADO Y DESENCOFRADO M2 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 1.49 20.43 30.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (CUnd 1.00 87.96 87.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07 VALVULA DE CONTROL DE Q 2" RED DE DISTRIBUCION (08 UNID)
01.02.04.07.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 40.42 0.45 18.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.02 TRAZO NIVELACION Y REPLANTEO M2 10.88 1.89 20.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 8.08 13.8 111.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 8.80 1.72 15.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.64 6.44 4.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 2.30 11.45 26.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 2.56 5.81 14.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 6.62 3.50 23.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 2.32 341.89 793.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.10 ENCOFRADO Y DESENCOFRADO M2 38.28 20.03 766.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 11.56 20.43 236.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.12 ACERO FY=4200 KG/M2 KG 39.98 4.71 188.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (CUnd 8.00 101.22 809.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08 VALVULA DE PURGA Q 1"/ Q 3/4 TIPO II . RED DE DISTRIBUCION (08 UNID)
01.02.04.08.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 66.24 0.45 29.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.02 TRAZO NIVELACION Y REPLANTEO M2 14.72 1.89 27.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 10.37 13.8 143.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 12.00 1.72 20.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.96 6.44 6.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 3.46 11.45 39.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 3.84 5.81 22.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 7.84 3.50 27.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.09 CONCRETO F.C=175 KG/CM2 (SIN MEZCLADORA) M3 2.45 341.89 837.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.10 ENCOFRADO Y DESENCOFRADO M2 40.84 20.03 818.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 11.56 20.43 236.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.12 ACERO FY=4200 KG/M2 KG 39.98 4.71 188.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (PU Und 8.00 115.66 925.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09 CONEXIONES DOMICILIARIAS - LAVADERO DE CONCRETO (72 UNID)
01.02.04.09.01 TRABAJO PRELIMINARES
01.02.04.09.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 910.80 0.45 409.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02 TRAZO NIVELACION Y REPLANTEO M2 463.68 1.89 876.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02 MOVIMIENTO DE TIERRAS
01.02.04.09.01.02.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M2 316.51 13.80 4,367.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 118.08 1.72 203.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.03CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 28.80 6.44 185.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.04RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 86.40 11.45 989.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.05RELLENO COMPACTO CON MATERIAL PROPIO M3 86.40 5.81 501.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.06ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 293.41 3.50 1,026.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.03 OBRAS DE CONCRETO SIMPLE
01.02.04.09.01.03.01CONCRETO F C=100 KG/M2 +30P.M (SIN MEZCLADORA) M3 6.8 246.24 1,674.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.04 OBRAS DE CONCRETO ARMADO
01.02.04.09.01.04.01CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 17.31 371.95 6,438.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.04.02ENCOFRADO Y DESENCOFRADO M2 348.35 20.03 6,977.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.04.03ACERO FY=4200 KG/M2 KG 2351.76 4.71 11,076.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.09.01.05.01TARRAJEO EN EXTERIORES MEZCLA E=1.5 CM. PULIDO CON OCRM2 267.80 30.18 8,082.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.06 VARIOS
01.02.04.09.01.06.01ENCOFRADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"6" M3 10.82 61.07 660.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.06.02POZO DRENAJE DE AGUAS SERVIDAS (1.0x1.0x20M) UNID 72 79.5 5,724.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.07 CAJA VALVULA DE CONTROL
01.02.04.09.01.07.01CONCRETO F.C=210 KG/CM2 (SIN MEZCLADORA) M3 1.94 371.95 721.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.07.02CONCRETO F.C=175 KG/CM2 (SIN MEZCLADORA) M3 0.51 341.89 174.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.07.03ENCOFRADO Y DESENCOFRADO M2 89.28 20.03 1,788.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.07.04ACERO FY=4200 KG/M2 KG 189.97 4.71 894.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.08 INSTALACION SANITARIA
01.02.04.09.08.01 SISTEMA DE AGUA FRIA
01.02.04.09.08.01.01INSTALACION ACCESORIOS SISTEMA DE AGUA FRIA UNID 72.00 135.12 9,728.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.08.02 SISTEMA DE DESAGUE
01.02.04.09.08.02.01INSTALACION ACCESORIOS SISTEMA DE DESGUE Y DRENAJE UNID 72.00 92.68 6,672.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.08.03 CONEXIÓN A RED PUBLICA
01.02.04.09.08.03.01SUNIMISTRO E INSTALACION VALVULAS DE CONTROL DE 3/4" UNID 72.00 129.66 9,335.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05 AMPLIACION Y MEJORAMIENTO SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS
01.02.05.01 UBS CON LETRINAS DE ARRASTRE HIDRAULICO Y BIODIGESTOR (72 UNID)
01.02.05.01.01 ESTRUCTURA
01.02.05.01.01.01 TRABAJOS PRELIMINARES
01.02.05.01.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 2856.96 0.45 1,285.63 392.96 176.83 13.75% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.01.02TRAZO NIVELACION Y REPLANTEO M2 1839.42 1.89 3,476.50 263.80 498.57 14.34% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.02 MOVIMIENTO DE TIERRAS
01.02.05.01.01.02.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 549.50 13.80 7,583.10 71.24 983.11 12.96% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.02.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 320.40 1.72 551.09 20.74 35.67 6.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.02.03RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 232.99 5.81 1,353.67 6.47 37.59 2.78% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.02.04ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 511.70 3.50 1,790.95 14.60 51.10 2.85% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03 OBRAS DE CONCRETO SIMPLE
01.02.05.01.01.03.01CIMIENTOS CORRIDOS MEZCLA C;H-1.10 +30% PG. M3 136.08 166.05 22,596.08 33.60 5,579.28 24.69% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03.02SOBRE CIMIENTOS MEZCLA C;H 1.8 +25% P.M M3 21.09 196.96 4,153.89 7.81 1,538.26 37.03% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03.03FALSO PISO DE 4" CON MEZCLA C;H - 1.8 M2 208.66 28.15 5,873.78 13.80 388.47 6.61% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 27.25 341.89 9,316.50 27.25 9,316.50 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03.05ENCOFRADO Y DESENCOFRADO M2 605.16 30.99 18,753.91 104.16 3,227.92 17.21% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04 OBRAS DE CONCRETO ARMADO
01.02.05.01.01.04.01LAVADERO DE CONCRETO
01.02.05.01.01.04.01CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 19.77 371.95 7,353.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.01ENCOFRADO Y DESENCOFRADO M2 343.08 29.65 10,172.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.01ACERO FY=4200 KG/M2 KG 2749.72 4.71 12,951.18 609.84 2,872.35 22.18% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.02COLUMNAS
01.02.05.01.01.04.02CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 17.69 371.95 6,579.80 7.32 2,722.67 41.38% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.02ENCOFRADO Y DESENCOFRADO M2 449.28 39.25 17,634.24 110.51 4,337.52 24.60% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.02ACERO FY=4200 KG/M2 KG 3104.67 4.71 14,623.00 ### 6,775.76 46.34% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.03VIGAS
01.02.05.01.01.04.03CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 16.87 371.95 6,274.80 4.78 1,777.92 28.33% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.03ENCOFRADO Y DESENCOFRADO M2 240.55 40.15 9,658.08 64.22 2,578.43 26.70% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.03ACERO FY=4200 KG/M2 KG 3957.85 4.71 18,641.47 738.90 3,480.22 18.67% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.04CAJA VALVULA DE CONTROL
01.02.05.01.01.04.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 1.94 341.89 663.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.51 371.95 189.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.04ENCOFRADO Y DESENCOFRADO M2 89.28 20.03 1,788.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.04ACERO FY=4200 KG/M2 KG 189.97 4.71 894.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.05ESTRUCTURA MADERA TECHO
01.02.05.01.01.04.05VIGA DE APOYO DE MADERA 3"x2"x2.10M P2 781.30 9.42 7,359.85 75.95 715.45 9.72% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.05CORREAS DE MADERA 2"x2"X3m P2 744.09 6.96 5,178.87 72.32 503.35 9.72% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02 ARQUITECTURA
01.02.05.01.02.01 MUROS Y TABIQUE SE ALBAÑERIA
01.02.05.01.02.01.01MUROS DE SOGA CON LADRILLO DE ARCILLA 0..09x0.12x0.24 M M2 863.28 55.22 47,670.32 341.04 18,832.23 39.51% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.05.01.02.02.01TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 537.84 22.63 12,171.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02.02FROTACHADO Y ACABADOS MUROS CARAVISTAS EXTERIORES M3 812.88 6.26 5,088.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02.03TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM/PULIDO CO M2 475.20 31.31 14,878.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02.04TARRAJEO DE VIGAS Y COLUMNAS MEZCLA C.A-1.5,E=1.5 CM M2 404.28 24.91 10,070.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02.05TARRAJEO EN EXTERIORES MEZCLA C.A-1.5,E=1.5 CM7PULIDO C M2 274.25 30.18 8,276.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.03 ZOCALOS
01.02.05.01.02.03.01ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 46.08 30.18 1,390.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.04 CONTRAZOCALOS
01.02.05.01.02.04.01CONTRA ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 82.80 30.18 2,498.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.05 PISOS Y PAVIMENTOS
01.02.05.01.02.05.01PISO DE CEMENTO PULIOD Y BRUÑADO E=2" CON OCRE M2 207.36 30.08 6,237.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.06 COBERTURA
01.02.05.01.02.06.01COBERTURA CON PLANCHA ENTERNIT DE 1.10x2.44x4M (ONDA 100M2 532.22 45.23 24,072.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.07 CARPINTERIA DE MADERA
01.02.05.01.02.07.01PUERTA DE MADERA MACHIHEMBRADA M2 120.96 249.03 30,122.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.07.02VENTANA DE MADERA CON MALLA MOSQUITERO M2 19.44 121.32 2,358.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.08 CERRAJERIA
01.02.05.01.02.08.01CERRADURA TIPO PEDILLA PARA BAÑOS UNID 72.00 45.00 3,240.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.08.02BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4" UNID 216.00 13.28 2,868.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.09 PINTURA
01.02.05.01.02.09.01PINTURA AL LATEX MATE INTERIORES 2 MANOS M2 630.72 8.31 5,241.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.09.02PINTURA AL LATEX MATE EXTERIORES 2 MANOS M2 1124.28 8.06 9,061.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.09.03PINTURA ESMALTE EN ZOCALOS H=0.20M M2 128.88 7.52 969.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03 INTALACIONES SANITARIAS
01.02.05.01.03.01 SISTEMA DE AGUA FRIA
01.02.05.01.03.01.01EXCAVACIONES MANUAL EN MATERIAL COMPACTO M3 175.23 10.73 1,880.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 28.80 6.44 185.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 103.68 11.45 1,187.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.04RELLENO COMPACTADO CON MATERIAL PROPIO M3 69.12 5.81 401.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 37.48 3.50 131.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.06SUMINISTRO E INSTALACION TUB, PVB, SAP, Q 1/2" C-10 ML 2145.60 6.95 14,911.92 258.00 1,793.10 12.02% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.07SALIDA DE AGUA FRIA 1/2" PTO 72.00 21.65 1,558.80 29.00 627.85 40.28% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.08LLAVE DE PASO Q1/2" UNID 72.00 47.33 3,407.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.09GRIFO CROMADO DE 1/2" UNID 72.00 29.37 2,114.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.10SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE AGUA FRIGLB 72.00 114.70 8,258.40 29.00 3,326.30 40.28% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.11SUMINISTRO E INSTALACION ACCESORIOS CAJA DE VALVULA COUNID 72.00 95.92 6,906.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02 SISTEMA DE DESAGUE
01.02.05.01.03.02.01EXCAVACION MANUAL ZANJA EN MATERIAL COMPACTADO ME 219.89 10.73 2,359.42 84.93 911.30 38.62% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 40.18 6.44 258.76 20.87 134.40 51.94% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 144.63 11.45 1,656.01 54.00 618.30 37.34% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.04RELLENO COMPACTADO CON MATERIAL PROPIO M3 48.21 5.81 280.10 17.82 103.53 36.96% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 71.02 3.50 248.57 27.44 96.04 38.64% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.06TUBERIA PVC DE 2 ML 1166.40 6.75 7,873.20 343.50 2,318.63 29.45% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.07TUBERIA PVC DE 4 ML 921.6 10.91 10,054.66 87.60 955.72 9.51% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.08SALIDA DE DESAGUE EN PVC SAL 2 PTO 216.00 30.98 6,691.68 129.00 3,996.42 59.72% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.09SALIDA DE DESAGUE EN PVC SAL 4 PTO 144.00 58.19 8,379.36 56.00 3,258.64 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.10SALIDA DE VENTILACION EN PVC 2 PTO 72.00 59.22 4,263.84 28.00 1,658.16 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.11SUMIDERO C/TRAMPA PVC SAL 2 UNID 144.00 30.64 4,412.16 56.00 1,715.84 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.12SUMIDERO C/TRAMPA "P" CON REGISTRO UNID 72.00 43.08 3,101.76 28.00 1,206.24 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.13REGISTRO DE BRONCE 4 UNID 72.00 35.06 2,524.32 28.00 981.68 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.14SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE DESAGU GLB 72.00 204.64 14,734.08 41.75 8,543.72 57.99% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.15COLOCACION DE CAJA DE REGISTRO DE 12x24" UNID 72.00 135.2 9,734.40 32.00 4,326.40 44.44% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.03 APARATOS SANITARIOS Y ACCESORIOS
01.02.05.01.03.03.01INODORO BLANCO 6.0 LITROS PZA 72.00 194.99 14,039.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.03.02LAVATORIO DE PARED BLANCO 1 LLAVE PZA 72.00 141.81 10,210.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.03.03DUCHA CON TERMA ELLETRICA PZA 72.00 149.07 10,733.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04 INSTALACIONES ELECTRICAS
01.02.05.01.04.O1 SALIDA DE TECHO C/CABLE TW 2.5MM(14)+PVC SEL 19MM(3/4) PTO 72.00 56.06 4,036.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04.O2 SALIDA DE INTERRUPTOR C7CABLE AWG TW 2.5MM(14)+D PVC SELPTO 72.00 32.61 2,347.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04.O3 SALIDA PARED PARA TERMA C/CABLE AWG TW 2.5MM(12)+D PVC PSTO 72.00 71.02 5,113.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04.O4 TABLERO DE DISTRIBUCION DE 02 LLAVES UNID 72.00 84.85 6,109.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04.O5 ACOMETIDA DESDE VIVIENDA PROM=15.0M.(2.1x2.5MM THW) ML 1440.00 2.09 3,009.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05 BIODIGESTOR
01.02.05.01.05.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 306.00 13.80 4,222.80 67.42 930.40 22.03% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 765.00 1.72 1,315.80 38.35 65.96 5.01% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.03 RELLENO COMPACTADO CON MATERIAL PROPIO M3 217.26 5.81 1,262.28 37.97 220.61 17.48% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.04 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 117.97 3.50 412.90 33.37 116.80 28.29% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.05 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 1.08 341.89 369.24 1.08 369.24 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.06 ACERO FY=4200 KG/M2 KG 254.02 4.71 1,196.43 100.55 473.59 39.58% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.07 BIODIGESTOR DE 600L.T.(INC.ACCESORIOS E INSTALACION) UNID 72.00 2005.32 144,383.04 28.00 56,148.96 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06 CAJA DE REGISTRO LODOS
01.02.05.01.06.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 27.65 13.80 381.57 15.67 216.25 56.67% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06.02 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 20.28 341.89 6,933.53 5.21 1,781.25 25.69% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06.03 ENCOFRADO Y DESENCOFRADO M2 211.68 20.03 4,239.95 87.78 1,758.23 41.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06.04 TARRAJEO E IMPLEMETACION MEZCLA C.A-1.5,E=1.6 CM M2 106.56 23.06 2,457.27 25.16 580.19 23.61% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06.05 INSTALACION TAPA METALICA ESTRADA DE 75x0.75M UNID 72.00 147.00 10,584.00 26.00 3,822.00 36.11% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07 POZO PERCOLADOR VOL=1.50 M3
01.02.05.01.07.01 TRABAJOS PRELIMINARES
01.02.05.01.07.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 414.72 0.45 186.62 214.29 96.43 51.67% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.01.02TRAZO NIVELACION Y REPLANTEO M2 141.12 1.89 266.72 57.40 108.49 40.68% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02 MOVIMIENTO DE TIERRAS
01.02.05.01.07.02.01CORTE DE TERRRENO MANUAL P/NIVELACION M3 103.68 13.65 1,415.23 38.88 530.71 37.50% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.02ESCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 313.56 13.80 4,327.13 115.00 1,587.04 36.68% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.03PERFILADO Y CONPACTADO EN FUNDACIONES M2 672.48 1.72 1,156.67 101.74 174.99 15.13% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.04CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 5.40 6.44 34.78 0.75 4.83 13.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.05RELLENO COMPACTADO CON MATERIAL PROPIO M3 147.79 5.81 858.66 20.50 119.11 13.87% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.06ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 352.9 3.5 1,235.15 43.30 151.55 12.27% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.03 OBRAS DE CONCRTO SIMPLE
01.02.05.01.07.03.01CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 17.01 246.24 4,188.54 6.54 1,610.41 38.45% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.03.02CONCRETO FC=140 KG/CM2 (SIN MEZCLADORA) M3 1.81 307.68 556.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.03.03ENCOFRADO Y DESENCOFRADO M2 20.52 26.86 551.17 20.52 551.17 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04 OBRAS DE CONCRETO ARMADO
01.02.05.01.07.04.01LOSA TECHO
01.02.05.01.07.04.01CONCRETO PC=210 KG/CM2 (SIN MEZCLADORA) M3 13.15 371.95 4,891.14 3.25 1,208.84 24.71% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.01ACERO FY=4200 KG/M2 KG 836.56 4.71 3,940.20 275.19 1,296.14 32.90% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.01ENCOFRADO Y DESENCOFRADO LOSA M2 163.44 36.94 6,037.47 33.51 1,237.86 20.50% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.02TAPA DE CONCRETO
01.02.05.01.07.04.02CONCRETO PC=210 KG/CM2 (SIN MEZCLADORA) M3 5.45 371.95 2,027.13 1.39 515.15 25.41% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.02ACERO FY=4200 KG/M2 KG 685.96 4.71 3,230.87 144.69 681.49 21.09% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.02ENCOFRADO Y DESENCOFRADO TAPA M2 105.87 26.86 2,843.67 24.05 645.98 22.72% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.05 FILTROS
01.02.05.01.07.05.01MURO CILINDRICO CON LADRILLO CORRIENTE CABEZA Y MORTE M2 276.48 103.18 28,527.21 105.56 10,891.68 38.18% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.05.02GRAVA FILTRANTE CON PIEDRA CHANCADA DE 1/2 M3 44.28 112.88 4,998.33 22.02 2,485.62 49.73% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.05.03GRAVA FILTRANTE CON PIEDRA SELECCIONADA DEL RIO 2" M3 8.64 49.88 430.96 2.54 126.70 29.40% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.06 INSTALACIONES SANITARIAS
01.02.05.01.07.06.01SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTRO (PERCOL UNID 72.00 83.57 6,017.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03 SUBSISTEMA DE SANEAMIENTO BASICO-CALLIPATA MEDIA
01.03.01 LINEA DE CONDUCCION CON TUBERIA PVC SAP (L=273.21 ML)
.01.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL ML 273.21 0.22 60.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.02 TRAZO NIVELACION Y REPLANTEO KM 0.27 452.66 122.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.03 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 273.21 0.85 232.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.04 EXCAVACION MANUAL ZANJA E MATERIAL COMPACTO M3 107.63 10.73 1,154.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.05 EXCAVACION MANUAL ZANJA EN ROCA SUELTA : PERFORACION M3 4.42 24.40 107.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.06 EXCAVACION MANUAL ZANJA EN ROCA FIJA : PERFORACION Y V M3 0.40 34.61 13.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.07 LIMPIEZA DE MATERIAL RESULTANTE DE VOLADURA M3 6.02 12.90 77.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.08 REFINE Y NIVELACION DE FONDO ZANJA EN MATERIAL COMPACTML 269.70 0.28 75.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.09 REFINE Y NIVELACION DE FONDO ZANJA EN ROCA SUELTA ML 11.04 0.78 8.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.10 REFINE Y NIVELACION DE FONDO ZANJA EN ROCA FIJA ML 1 1.18 1.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.11 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 13.66 6.44 87.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.12 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 49.18 11.45 563.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.13 RELLENO COMPACTADO CON MATERIAL PROPIO M3 100.4 5.81 583.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.14 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 2" C-10 ML 153.10 8.46 1,295.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.15 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 1" C-10 ML 133.77 4.07 544.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.16 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 193.98 193.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.17 PRUEVA HIDRAULICA Y DESIFECCION DTUBERIA ML 273.21 0.45 122.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02 OBRAS DE ARTE LINEA DE CONDUCCION
01.03.02 MEJORAMIENTO CAMARAS DE CAPACITACION MANANTE C-01 (02 UNID)
01.03.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 49.88 0.45 22.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02 TRAZO NIVELACION Y REPLANTEO M2 16.25 1.89 30.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 10.34 13.80 142.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.04 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 9.26 3.50 32.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"-6" M3 1.53 61.07 93.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.06 FILTRO CON PIEDRA PEQUEÑA TAM MAX 2" M3 0.25 56.00 14.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.07 FILTRO CON GRAVA SELECIONADA DE 3/4-1" M3 0.54 114.50 61.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.08 FILTRO CON GRAVA SELECIONADA DE 1/2 M3 1.86 56.58 105.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.09 TARRAJEO E IMPLEMETACION MEZCLA C.A-1.5,E=1.5 CM M2 5.78 23.06 133.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.10 PINTURA ESMALTE EN EXTERIORES M2 2.92 7.14 20.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.11 INSTALACION TUBERIAS DE INGRESO PVC Q=2" PERFORADO UNID 2.00 59.60 119.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.12 INSTALACION TUBERIAS DE SALIDA CON VALVULAS Q 1" UNID 2.00 138.31 276.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.13 INSTALACION TUBERIAS SISTEMA LIMPIA Y REBOSE Q=2" UNID 2.00 172.78 345.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.14 INSTALACION TAPA METALICA ESTRADA DE 75x0.75M UNID 2.00 266.25 532.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.15 INSTALACION TAPA METALICA ESTRADA DE 55x0.40M UNID 2.00 177.50 355.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16 CERCO PERIMETRICO
01.03.02.16.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 180.00 0.45 81.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.02 TRAZO NIVELACION Y REPLANTEO M2 72.00 1.89 136.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.03 EXCAVACION PARA ESTRUTUTAS EN MATERIAL COMPACTADO M3 4.16 13.80 57.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.04 CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 4.03 246.24 992.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.05 SUMINISTRO E INSTALACION DE RODILLOS DE MADERA L=2.10Mx4
UNID 40.00 14.10 564.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 756.00 1.33 1,005.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.07 INSTALACION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) UNID 2.00 66.87 133.74 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02 CAMARA DE REUNION
01.03.02.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 16.00 0.45 7.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.02 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M2 7.18 1.89 13.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.03 PERFILADO Y CONPACTADO EN FUNDACIONES M3 3.35 13.80 46.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.04 RELLENO COMPACTADO EN FUNDACIONES M2 4.02 1.72 6.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.59 5.81 3.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 3.43 3.50 12.01 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.07 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"-6" M3 0.50 61.07 30.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.08 CONCRETO FC=100 KG/CM2 SOLDADO (SIN MEZCLADORA) M3 0.06 212.44 12.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.09 CONCRETO FC=210 KG/CM2 (SIN MEZCLADORA) M3 1.28 371.95 476.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.10 ENCOFRADO Y DESENCOFRADO M2 13.44 20.03 269.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5M2 8.00 20.43 163.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.12 TARRAJEO E IMPERMEABILIZACION MEZCLA C.A-1.5,E=1.5 CM M2 4.20 23.06 96.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.13 ACERO FY=4200 KG/M2 KG 61.09 4.71 287.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.14 PINTURA ESMALTE EN EXTERIORES M2 3.19 7.14 22.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.15 INSTALACIONES DE ACCESORIOS CJA DE REUNION Und 1.00 121.5 121.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.16 INSTALACION SISTEMA DE SALIDA CON VALVULAS 2" Und 1.00 335.57 335.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.17 INSTALACION SISTEMA DE LIMPIA Y REBOSE 2" Und 1.00 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.18 INTALACION TTAPA MECANICA DE INSPECCION 0.75xO.75 M Und 1.00 266.25 266.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.19 INTALACION TTAPA MECANICA CAJA DE VALVULAS 0.55xO.45 M Und 1.00 177.50 177.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03 RESERVORIO RECTANGULAR APOYADO CAP=11.00 M3 (01 UNID)
01.03.02.03.01 TRABAJOS PRELIMINARES
01.03.02.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 39.80 0.45 17.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.01.02 TRAZO NIVELACION Y REPLANTEO M2 15.70 1.89 29.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02 MOVIMIENTO DE TIERRAS
01.03.02.03.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 13.18 19.32 254.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.02 EXCAVACION MANUAL ZANJA EN ROCA SUELTA . PERFORACION M3 30.74 24.40 750.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.03 PERFILADO Y CONPACTADO EN FUNDACIONES M2 37.60 1.72 64.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.04 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.60 6.44 3.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.05 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 1.80 11.45 20.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.06 RELLENO COMPACTO CON MATERIAL PROPIO M3 20.44 5.81 118.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.07 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 34.46 3.5 120.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.03 OBRAS DE CONCRETO SIMPLE
01.03.02.03.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 1.3 212.44 276.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.05 341.89 17.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.04 OBRAS DE CONCRETO ARMADO
01.03.02.03.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 12.93 371.95 4,809.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.04.02 ENCOFRADO Y DESENCOFRADO KG 72.72 20.03 1,456.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.04.03 ACERO FY=4200 KG/M2 M2 923.50 4.71 4,349.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.02.03.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 43.01 20.43 878.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 27.04 23.06 623.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.05.03 MORTERO 1.5 E=2.5, PARA PENDIIENTES DE FONDO M2 7.1 20.45 145.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.06 PINTURA
01.03.02.03.06.01 PINTURA ESMALTE EN EXTERIORES M2 22.50 7.14 160.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07 VARIOS
01.03.02.03.07.01 INSTALACION DE INGRESO Y BAY PASS CON TUB PVC Q 2" Und 1.00 449.47 449.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07.02 INSTALACION SISTEMA DE SALIDA CON VALVULAS 2" Und 1.00 335.57 335.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1.00 285.86 285.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07.04 SUMINISTRO E INSTALACION DE ESCALERAS H=1.10 M, E HIPOC GLB 1.00 463 463.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"-6" M3 2.99 61.07 182.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08 CERCO PERIMETRICO
01.03.02.03.08.01 LIMPIEZA DEL TERRENO MANUAL M2 30.00 0.45 13.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.02 TRAZO NIVELACION Y REPLANTEO M2 12.00 1.89 22.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 1.46 19.32 28.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.04 CONCRETO FC=175KL/M2 +30%(SIN MEZCLADORA) M3 1.41 246.24 347.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.05 SUMINISTRO E INSTALACIONES DE ROLLISOS DE MADERA L=2.10M Und 14.00 14.10 197.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.06 SUMINISTRO E INSTALACIONES DE ALAMBRE DE PUAS PARA CERC ML 252.00 1.33 335.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.07 INTSTLALCION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) Und 1.00 66.87 66.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03 LINEA DE ADUCCION Y DISTRIBUCION CON TUBERIA PVC SAP
01.03.03.01 RED DE SISTRIBUCION CON TUBERIA PVC SAP (L=2319.11ML)
01.03.03.01.01 LIMPIEZA DEL TERRENO MANUAL ML 2319.11 0.22 510.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.02 TRAZO Y REPLANTEO PRELIMINAR KM 2.32 452.65 1,050.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.03 CONTRO FOTOGRAFICO FURANTE LA EJECUCION ML 2319.11 0.85 1,971.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.04 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 927.64 10.73 9,953.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.05 REFINE Y NIVELACION FONDO ZANJA EN MATRIAL COMPACTO ML 2319.11 0.28 649.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.06 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 115.96 6.44 746.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.07 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 417.44 11.45 4,779.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.08 RELLENO COMPACTO CON MATERIAL PROPIO M3 654.34 5.81 3,801.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.09 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 3/4" C-10 ML 930.00 4.23 3,933.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.10 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 1" C-10 ML 1158.31 4.07 4,714.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.11 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 1.5" C-10 ML 40.90 7.8 319.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.12 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 2" C-10 ML 305.87 8.46 2,587.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.13 SUMINISTRO E INSTALACION DE ACCESORIOS PVC SAP 1"Y 2" (YIGLB 1 1138.17 1,138.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.14 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 2319.11 0.45 1,043.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04 OBRAS DE ARTE RED DISTRIBUCION
01.03.04.01 CAMARA ROMPE PRESIONES Q2" TIPO-VII (02 UNID)
01.03.04.01.01 TRABAJOS PRELIMINARES
01.03.04.01.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 23.14 0.45 10.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.01.01.02 TRAZO NIVELACION Y REPLANTEO M2 6.78 1.89 12.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02 MOVIMIENTO DE TIERRAS
01.03.04..01.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 16.62 13.8 229.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 6.73 1.72 11.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.50 6.44 3.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 1.8 11.45 20.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 10.20 5.81 59.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 10.58 3.50 37.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.03 OBRAS DE CONCRETO SIMPLE
01.03.04..01.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.19 212.44 40.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.12 341.89 41.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.04 OBRAS DE CONCRETO ARMADO
01.03.04..01.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 2.20 371.95 818.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.04.02 ENCOFRADO Y DESENCOFRADO KG 24.89 20.03 498.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.04.03 ACERO FY=4200 KG/M2 M2 158.08 4.71 744.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.04..01.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 10.37 20.43 211.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 6.60 23.06 152.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.06 PINTURA
01.03.04..01.06.01 PINTURA ESMALTE EN EXTERIORES M2 6.66 7.14 47.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.07 VALVULAS Y ACCESORIOS
01.03.04..01.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 2.00 373.37 746.74 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 2.00 84.50 169.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 2.00 172.78 345.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.08 VARIOS
01.03.04..01.08.01 ENCOFRADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"6" M3 0.75 61.07 45.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..02 VALVULA DE CONTROL DE Q 2" RED DE DISTRIBUCION (01 UNID)
01.03.04.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.02 TRAZO NIVELACION Y REPLANTEO M2 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 1.01 13.8 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.10 ENCOFRADO Y DESENCOFRADO M3 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 1.45 20.43 29.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (CUnd 1.00 168.19 168.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03 VALVULA DE CONTROL DE Q 1" RED DE DISTRIBUCION (04 UNID)
01.03.04.03.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 20.16 0.45 9.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.02 TRAZO NIVELACION Y REPLANTEO M2 5.44 1.89 10.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 4.04 13.8 55.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 4.40 1.72 7.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.32 6.44 2.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 1.15 11.45 13.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 1.28 5.81 7.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 3.31 3.50 11.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 1.16 341.89 396.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.10 ENCOFRADO Y DESENCOFRADO M3 19.14 20.03 383.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 5.78 20.43 118.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.12 ACERO FY=4200 KG/M2 KG 19.99 4.71 94.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (CUnd 4.00 101.22 404.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04 VALVULA DE PURGA DE Q 1" @ Q 3/4" TIPO II- RED DE DISTRIBUCION (03UNID)
01.03.04.04.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 24.84 0.45 11.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.02 TRAZO NIVELACION Y REPLANTEO M2 5.52 1.89 10.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 3.89 13.8 53.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 4.50 1.72 7.74 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.36 6.44 2.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 1.3 11.45 14.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 1.44 5.81 8.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 2.94 3.50 10.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.92 341.89 314.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.10 ENCOFRADO Y DESENCOFRADO M3 15.32 20.03 306.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 4.34 20.43 88.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.12 ACERO FY=4200 KG/M2 KG 14.99 4.71 70.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 1"/ Q3/ Und 3.00 115.66 346.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..05 CONEXIONES DOMICILIARIAS -LAVADEROS DE CONCRETO (62 UNID)
01.03.04..05.01 TRABAJOS PRELIMINARES
01.03.04..05.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 784.30 0.45 352.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..05.01.02 TRAZO NIVELACION Y REPLANTEO M2 399.28 1.89 754.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02 MOVIMIENTO DE TIERRAS
01.03.04.05.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 272.55 13.8 3,761.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 101.68 1.72 174.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 24.80 6.44 159.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 74.4 11.45 851.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 74.4 5.81 432.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 252.66 3.50 884.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.03 OBRAS DE CONCRETO SIMPLE
01.03.04.05.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 5.86 246.24 1,442.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.04 OBRAS DE CONCRETO ARMADO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 14.90 371.95 5,542.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.04.02 ENCOFRADO Y DESENCOFRADO M2 299.97 20.03 6,008.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.04.03 ACERO FY=4200 KG/M2 KG 2025.13 4.71 9,538.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.04.05.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 230.69 30.18 6,962.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.06 VARIOS
01.03.04.05.06.01 ENCOFRADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"6" M3 9.32 61.07 569.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.06.02 POZO DE DRNAJE DE AGUA SERVDAS 1.0x1.0x1.20 M Und 62.00 79.50 4,929.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.07 CAJA DE VALVULA DE CONTROL
01.03.04.05.07.01 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 1.67 341.89 570.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.07.02 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 0.44 371.95 163.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.07.03 ENCOFRADO Y DESENCOFRADO M2 76.88 20.03 1,539.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.07.04 ACERO FY=4200 KG/M2 KG 163.58 4.71 770.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.08 INSTALACIONES SANITARIAS
01.03.04.05.08.01 SISTEMA DE AGUA FRIA
01.03.04.05.08.01.01INSTALACION ACCESORIOS SISTEMA DE AGUA FRIA Und 62.00 135.12 8,377.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.08.02 SISTEMA DE DESAGUE
01.03.04.05.08.02.01INSTALACION ACCESORIOS SISTEMA DE DESAGUE Y DRENAJE Und 62.00 92.68 5,746.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.08.03 CONEXIÓN A RED PUBLICA
01.03.04.05.08.03.01SUMINISTRO E INSTALACION VALVULA DE CONTROL DE 3/4 Und 62.00 129.66 8,038.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05 AMPLIACION DE MEJORAMIENTO SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS
01.03.05.01 RED COLECTOR Y EMISOR DE DESAGUE (1588.24 ML)
01.03.05.01.01 TRAZO Y REPLANTEO PRELIMINAR KM 1.59 452.65 719.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.02 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 1588.24 0.85 1,350.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.03 EXCAVACION ZANJA EN MATERIAL NO CALIFICADO C/MAQUINARI M3 1334.12 12.12 16,169.53 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.04 REFINE Y NIVELACION FONDO ZANJA EN MATERIAL COMPACTAD ML 952.94 0.28 266.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 142.94 12.15 1,736.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 285.88 11.45 3,273.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 905.30 5.81 5,259.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.08 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 1362.21 37.77 51,450.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.09 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 305.44 41.97 12,819.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.10 PRUEBA HIDRAULICA RED DE TUBERIA 5"A 8" M 1588.24 0.79 1,254.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02 BUSONES DE CONCRETO T-I (H=1.20)- RED COLECTOR Y EMISOR (02 UNID)
01.03.05.02.01 TRAZO NIVELACION Y REPLANTEO M2 3.90 1.89 7.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.02 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 5.13 13.80 70.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.03 REFILADO Y COMPACTADO EN FUNDACIONES M2 13.92 1.72 23.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.80 5.81 4.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.05 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 5.36 3.50 18.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.06 CONCRETO FC=100KL/M2 SOLDADO (SIN MEZCLADORA) M3 0.42 212.44 89.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.07 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 1.95 341.89 666.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.08 CONCRETO FC=2100KL/M2 (SIN MEZCLADORA) M3 0.73 371.95 271.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.09 ENCOFRADO Y DESENCOFRADO DE BUZON M2 16.62 43.67 725.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.10 ENLUCIDOS DE INTERIORES E=1/2, MEZCLA 1.5- MEDIA CAÑA M2 9.10 15.42 140.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.11 ACERO FY=4200 KG/M2 KG 55.81 4.71 262.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.12 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 4.2 37.77 158.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.13 SUMINISTRO Y COLOCACION TAPA DE F°F° CHARNELA Und 2.00 336.75 673.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03 BUZONES DE CONCRETO T_II Y III (H=1.20) RED COLECTOR Y EMISOR (39 UNID)
01.03.05.03.01 TRAZO NIVELACION Y REPLANTEO M2 83.07 1.89 157.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.02 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 100.09 13.80 1,381.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.03 REFILADO Y COMPACTADO EN FUNDACIONES M2 271.52 1.72 467.01 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 15.60 5.81 90.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.05 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 104.51 3.50 365.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.06 CONCRETO FC=100KL/M2 SOLDADO (SIN MEZCLADORA) M3 12.24 212.44 2,600.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.07 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 38.05 341.89 13,008.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.08 CONCRETO FC=2100KL/M2 (SIN MEZCLADORA) M3 14.2 371.95 5,281.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.09 ENCOFRADO Y DESENCOFRADO DE BUZON M2 345.07 43.67 15,069.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.10 ENLUCIDOS DE INTERIORES E=1/2, MEZCLA 1.5- MEDIA CAÑA M2 177.53 15.42 2,737.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.11 ACERO FY=4200 KG/M2 KG 1088.39 4.71 5,126.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.12 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 163.8 37.77 6,186.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.13 SUMINISTRO Y COLOCACION TAPA DE F°F° CHARNELA Und 39.00 336.75 13,133.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04 BUSONES DE CONCRETO T-IV (H=1.60)- RED COLECTOR Y EMISOR (01 UNID)
01.03.05.04.01 TRAZO NIVELACION Y REPLANTEO M2 2.04 1.89 3.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.02 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 3.27 13.80 45.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.03 REFILADO Y COMPACTADO EN FUNDACIONES M2 1.77 1.72 3.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.4 5.81 2.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.05 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 3.53 3.50 12.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.06 CONCRETO FC=100KL/M2 SOLDADO (SIN MEZCLADORA) M3 0.26 212.44 55.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.07 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 1.24 341.89 423.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.08 CONCRETO FC=2100KL/M2 (SIN MEZCLADORA) M3 0.36 371.95 133.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.09 ENCOFRADO Y DESENCOFRADO DE BUZON M2 10.09 43.67 440.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.10 ENLUCIDOS DE INTERIORES E=1/2, MEZCLA 1.5- MEDIA CAÑA M2 6.06 15.42 93.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.11 ACERO FY=4200 KG/M2 KG 87.26 4.71 410.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.12 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 3.15 37.77 118.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.13 SUMINISTRO Y COLOCACION TAPA DE F°F° CHARNELA Und 1.00 336.75 336.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05 CONEXIONES DOMICILIARIAS DESAGUE (58 UND)
01.03.05.05.01 TRAZO Y REPLANTEO PRELIMINAR M2 158.78 1.89 300.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.02 CONTROL TOPOGRAFICO DURANTE LA EJECUCION M3 125.06 13.80 1,725.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.03 EXCAVACION ZANJA EN MATERIAL NO CALIFICADO C/MAQUINARI M2 158.78 1.72 273.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.04 REFINE Y NIVELACION FONDO ZANJA EN MATERIAL COMPACTAD M3 13.92 6.44 89.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 50.11 11.45 573.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 66.82 5.81 388.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.07 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 33.15 3.5 116.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.08 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M2 8.95 341.89 3,059.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.09 ENCOFRADO Y DESENCOFRADO ML 160.08 20.03 3,206.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.10 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM Und 609.00 32.19 19,603.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.11 SUMINISTRO E INSTALACION ACCESORIOS PVC SAL Y TAPA F°F° 58.00 257.56 14,938.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06 SISTEMA LOCAL DE TRATAMIENTO DE AGUAS SERVIDAS
01.03.05.06.01 CAMARA DE REJAS (01 UNID)
01.03.05.06.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 27.90 0.45 12.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.02 TRAZO NIVELACION Y REPLANTEO M2 8.36 3.7 30.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 12.26 16.1 197.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.04 REFILADO FINAL DE TERRENO POSTERIOR DE CORTE M2 8.45 0.48 4.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 0.64 16.71 10.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.06 RELLENO COMPACTADO CON MATERIAL PROPIO M2 2.29 30.25 69.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 3.10 9.08 28.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 9.32 4.95 46.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.09 CONCRETO SIMPLE FC=100KL/M2 SOLDADO M3 0.07 214.10 14.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.10 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 0.75 371.95 278.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.11 ENCOFRADO Y DESENCOFRADO DE BUZON M3 7.24 20.03 145.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.12 TARRAJERO , IMPERMEABILIZACION Y ACABADOS M3 4.41 20.17 88.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.13 ACERO FY=4200 KG/M2 KG 49.88 4.71 234.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.14 SUMINISTRO Y COLOCACION DE REJILLAS CON FIERRO LISO D=1/ML 6.30 13.43 84.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.15 COLOCACION DE PARRILLA DE PROTECCION DE PLATINA (0.98x0.Und 1.00 636.69 636.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.16 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 11.34 41.97 475.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.17 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS (CAMARA Und 1.00 23.80 23.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02 CAJA DE INSPECCION -REGISTRO (05 UNID)
01.03.05.06.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 73.95 0.45 33.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.02 TRAZO NIVELACION Y REPLANTEO M2 17.45 3.70 64.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.03 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO M3 20.62 16.10 331.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.04 PERFILADO FINAL DE TERRENO POSTERIOR AL CORTE M2 17.45 0.48 8.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.10M M3 1.50 16.71 25.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.06 RELLENO COMPACTADO C/EQUIPO MATERIAL ZARANDEADO M3 5.40 30.25 163.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.07 RELLENO COMPACTADO A MANO- MATERIAL PROPIO M3 5.37 9.08 48.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 13.97 4.95 69.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.09 CONCRETO SIMPLE FC=100 KG/CM2, SOLDADO M3 0.13 214.1 27.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.10 CONCRETO FC=210 KG/CM2 (SIN MEZCLADORA) M3 1.27 371.95 472.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.11 ENCOFRADO Y DESENCOFRADO DE MUROS- LOSA M2 21.40 36.40 778.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.12 TARRAJERO , IMPERMEABILIZACION Y ACABADOS M2 6.00 20.17 121.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.13 ACERO FY=4200 KG/M2 KG 26.24 4.70 123.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.14 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM ML 15.75 32.19 506.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.15 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 10.50 37.77 396.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.16 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS D=4" Und 3.00 6.69 20.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.17 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS D=6" Und 2.00 10.71 21.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03 DISTRIBUIDOR DE CAUDALES (3 UND)
01.03.05.06.03.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 71.55 0.45 32.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR COM VALLAS AISLADM2 21.13 3.70 78.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.03 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO M3 28.31 16.10 455.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.04 PERFILADO FINAL DE TERRENO POSTERIOR AL CORTE M2 22 0.48 10.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.05 CAMA DE APOYO CON MATERIAL ZARANDEADO H=10CM M3 1.19 16.71 19.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.06 RELLENO COMPACTADO C/EQUIPO MATERIAL ZARANDEADO M3 4.28 30.25 129.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.07 RELLENO COMPACTADO A MANO- MATERIAL PROPIO M3 4.72 9.08 42.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 24.97 4.95 123.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.09 CONCRETO SIMPLE FC=100 KG/CM2, SOLDADO M3 0.16 214.10 34.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.10 CONCRETO FC=210 KG/CM2 (SIN MEZCLADORA) M3 1.69 371.95 628.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.11 ENCOFRADO Y DESENCOFRADO MUROS-LOSA M2 21.87 36.40 796.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.12 TARRAJERO , IMPERMEABILIZACION Y ACABADOS M2 9.97 20.17 201.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.13 ACERO FY=4200 KG/M2 KG 73.7 4.70 346.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.14 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM ML 20.79 32.19 669.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.15 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 20.79 37.77 785.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.16 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS D=4" Und 2.00 6.69 13.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.17 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS D=6" Und 1.00 10.71 10.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04 TANQUE SEPTICO DE CONCRETO CAP=25.00 M3 (02 UNID)
01.03.05.06.04.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 95.00 0.45 42.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.02 TRAZO NIVELACION Y REPLANTEO M2 47.72 3.70 176.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 192.46 16.10 3,098.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.04 REFILADO FINAL DE TERRENO POSTERIOR DE CORTE M2 47.72 0.48 22.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 0.60 16.71 10.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 2.16 30.25 65.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 33.62 9.08 305.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 195.17 4.95 966.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.09 CONCRETO SIMPLE FC=100KL/M2 SOLDADO M3 2.19 214.10 468.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.10 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 28.19 371.95 10,485.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.11 ENCOFRADO Y DESENCOFRADO DE BUZON M2 248.43 36.4 9,042.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.12 TARRAJERO , IMPERMEABILIZACION Y ACABADOS M2 182.95 20.17 3,690.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.13 ACERO FY=4200 KG/M2 KG 1383.23 4.7 6,501.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.14 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 13.02 37.77 491.77 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.15 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM ML 12.60 32.19 405.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.16 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS (TANQUEUnd 2.00 474.01 948.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05 POZO PERCOLADOR (04 UNI)
01.03.05.06.05.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 136.00 0.45 61.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.02 TRAZO NIVELACION Y REPLANTEO M2 57.40 3.7 212.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 249.68 16.1 4,019.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.04 REFILADO FINAL DE TERRENO POSTERIOR DE CORTE M2 57.40 0.48 27.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 1.92 16.71 32.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.06 RELLENO COMPACTADO CON MATERIAL ZARANDEADO M3 6.91 30.25 209.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.07 RELLENO COMPACTADO A MANO -MATERIAL PROPIO M3 5.49 9.08 49.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 287.21 4.95 1,421.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.09 MURO DE CIMIENTACION MEZCLA 1.10 +30% P.G M3 14.62 167.09 2,442.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.10 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 10.04 371.95 3,734.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.11 ENCOFRADO Y DESENCOFRADO DE BUZON M2 82.40 36.40 2,999.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.12 ACERO FY=4200 KG/M2 KG 144.00 4.70 676.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.13 MURO ESTABLE CON PIEDRA Y MORTERO M2 655.56 35.00 22,944.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.14 GRAVA FILTRANTE CON PIEDRA DE 6" Y GRAVA DE 1"- BASE M3 15.52 47.70 740.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.15 RELLENO CON GRAVA SELECCIONADA DE 1/2 ESPALDON MURO M3 43.36 44.63 1,935.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.16 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM ML 18.06 32.19 581.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.17 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS (PERCOUnd 4.00 83.57 334.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06 LECHO DE SECADO (01 UNID)
01.03.05.06.06.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 225.00 0.45 101.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.02 TRAZO NIVELACION Y REPLANTEO M2 118.76 3.70 439.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 102.38 16.10 1,648.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.04 REFILADO FINAL DE TERRENO POSTERIOR DE CORTE M2 128.64 0.48 61.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.05 MATERIAL BASE SELECCIONADO H=0.10 M M3 9.40 16.71 157.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.06 RELLENO COMPACTADO A MANO -MATERIAL PROPIO M3 15.79 9.08 143.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.07 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 107.06 4.95 529.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.08 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 8.49 341.89 2,902.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.09 CIMIENTOS CORRIDOS MEZCLA C.H - 1.10 + 30% PG M3 18.95 170.63 3,233.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.10 SOBRE CIMIENTO MEZCLA C.H - 1.8 +25% P.M M2 6.61 205.96 1,361.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.11 MURO DE PIEDRA EN MORTERO C.H= 1.10 KG 27.96 164.01 4,585.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.12 ENROCADO CANALETA CON PIEDRA MEDIANA TAM 4"-6" M2 49.40 35.31 1,744.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.13 ENCOFRADO Y DESENCOFRADO M3 31.64 20.03 633.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.14 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5, E=1.5M3 96.73 20.85 2,016.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.15 SUMINISTRO Y COLOCACION DE COLUMNAS DE MADERA D=6" ML 41.58 21.63 899.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.16 ESTRUCTURA DE TECHO CON MADERA - SOLERAS Y CORREAS Und 511.88 28.27 14,470.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.17 COBERTURA DE TECHO CON CALAMINA N°22(1.83x0.83) 129.95 15.39 1,999.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.18 PUERTA RUSTICA DE MADERA (2.00x1.10) DOBLE HOJA M2 1 259.13 259.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07 CERCO PERIMETRICO (150.50ML)
01.03.05.06.07.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 225.75 0.45 101.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.02 TRAZO NIVELACION Y REPLANTEO M2 90.3 1.89 170.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 5.51 13.8 76.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.04 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 5.34 246.24 1,314.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.05 SUMINISTRO E INSTALACION DE ROLLISOS DE MADERA L=2.10Mx4Und 53.00 14.1 747.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 790.13 1.33 1,050.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.07 INSTALACION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) Und 1 66.87 66.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07 UBS CON LETRINAS DE ARRASTRE HIDRAULICO (58 UNID)
01.03.05.07.01 ESTRUCTURA
01.03.05.07.01.01 TRABAJOS PRELIMINARES
01.03.05.07.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 2301.44 0.45 1,035.65 951.72 428.27 41.35% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.01.02TRAZO NIVELACION Y REPLANTEO M2 1481.76 1.89 2,800.53 611.78 1,156.26 41.29% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.02 MOVIMIENTO DE TIERRAS
01.03.05.07.01.02.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 442.66 13.80 6,108.71 96.00 1,324.80 21.69% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.02.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 258.10 1.72 443.93 106.75 183.61 41.36% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.02.03RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 187.69 5.81 1,090.48 77.01 447.43 41.03% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.02.04ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 412.20 3.50 1,442.70 96.00 336.00 23.29% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03 OBRAS DE CONCRETO SIMPLE
01.03.05.07.01.03.01CIMIENTOS CORRIDOS MEZCLA C;H-1.10 +30% PG. M3 109.62 166.05 18,202.40 22.19 3,684.65 20.24% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03.02SOBRE CIMIENTOS MEZCLA C;H 1.8 +25% P.M M3 16.99 196.96 3,346.35 5.40 1,063.58 31.78% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03.03FALSO PISO DE 4" CON MEZCLA C;H - 1.8 M2 168.08 28.15 4,731.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 21.95 341.89 7,504.49 20.33 6,951.31 92.63% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03.05ENCOFRADO Y DESENCOFRADO M2 487.49 30.99 15,107.32 124.00 3,842.76 25.44% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04 OBRAS DE CONCRETO ARMADO
01.03.05.07.01.04.01LAVADERO DE CONCRETO
01.03.05.07.01.04.01CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 15.93 371.95 5,925.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.01ENCOFRADO Y DESENCOFRADO M2 276.37 29.65 8,194.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.01ACERO FY=4200 KG/M2 KG 2215.05 4.71 10,432.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.02COLUMNAS
01.03.05.07.01.04.02CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 14.25 371.95 5,300.29 2.30 855.49 16.14% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.02ENCOFRADO Y DESENCOFRADO M2 361.92 39.25 14,205.36 68.64 2,694.12 18.97% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.02ACERO FY=4200 KG/M2 KG 2500.98 4.71 11,779.62 ### 4,935.04 41.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.03VIGAS
01.03.05.07.01.04.03CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 13.59 371.95 5,054.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.03ENCOFRADO Y DESENCOFRADO M2 193.78 40.15 7,780.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.03ACERO FY=4200 KG/M2 KG 3188.07 4.71 15,015.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.04CAJA VALVULA DE CONTROL
01.03.05.07.01.04.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 1.56 341.89 533.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.41 371.95 152.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.04ENCOFRADO Y DESENCOFRADO M2 71.92 20.03 1,440.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.04ACERO FY=4200 KG/M2 KG 153.03 4.71 720.77 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.05ESTRUCTURA MADERA TECHO
01.03.05.07.01.04.05VIGA DE APOYO DE MADERA 2"x2"x2.10M P2 629.38 9.42 5,928.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.05CORREAS DE MADERA 2"x2"X3m P2 599.41 6.96 4,171.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02 ARQUITECTURA
01.03.05.07.02.01 MUROS Y TABIQUE SE ALBAÑERIA
01.03.05.07.02.01.01MUROS DE SOGA CON LADRILLO DE ARCILLA 0..09x0.12x0.24 M M2 695.32 55.22 38,395.57 239.64 13,232.92 34.46% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.05.07.02.02.01TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 433.26 22.63 9,804.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02.02FROTACHADO Y ACABADOS MUROS CARAVISTAS EXTERIORES M2 654.82 6.26 4,099.17 181.90 1,138.69 27.78% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02.03TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM/PULIDO CO M2 382.80 31.31 11,985.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02.04TARRAJEO DE VIGAS Y COLUMNAS MEZCLA C.A-1.5,E=1.5 CM M2 325.87 24.91 8,117.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02.05TARRAJEO EN EXTERIORES MEZCLA C.A-1.5,E=1.5 CM7PULIDO C M2 220.92 30.18 6,667.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.03 ZOCALOS
01.03.05.07.02.03.01ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 37.12 30.18 1,120.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.04 CONTRAZOCALOS
01.03.05.07.02.04.01CONTRA ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 66.70 30.18 2,013.01 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.05 PISOS Y PAVIMENTOS
01.03.05.07.02.05.01PISO DE CEMENTO PULIOD Y BRUÑADO E=2" CON OCRE M2 167.04 30.08 5,024.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.06 COBERTURA
01.03.05.07.02.06.01COBERTURA CON PLANCHA ENTERNIT DE 1.10x2.44x4M (ONDA 100M2 428.74 45.23 19,391.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.07 CARPINTERIA DE MADERA
01.03.05.07.02.07.01PUERTA DE MADERA MACHIHEMBRADA M2 97.44 249.03 24,265.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.07.02VENTANA DE MADERA CON MALLA MOSQUITERO M2 15.66 121.32 1,899.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.08 CERRAJERIA
01.03.05.07.02.08.01CERRADURA TIPO PEDILLA PARA BAÑOS Und 58.00 45.00 2,610.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.08.02BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4" Und 174.00 13.28 2,310.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.09 PINTURA
01.03.05.07.02.09.01PINTURA AL LATEX MATE INTERIORES 2 MANOS M2 508.08 8.31 4,222.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.09.02PINTURA AL LATEX MATE EXTERIORES 2 MANOS M2 905.67 8.06 7,299.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.09.03PINTURA ESMALTE EN ZOCALOS H=0.20M M2 103.82 7.52 780.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03 INSTALACIONES SANITARIAS
01.03.05.07.03.01 SISTTEMA DE AGUA FRIA
01.03.05.07.03.01.01EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 141.16 10.73 1,514.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.02CAMA DE APOYO CON TIERRA CERNIDA E=0.10M M3 23.2 6.44 149.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.03RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 83.52 11.45 956.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.04RELLENO COMPACTO CON MATERIAL PROPIO M3 55.68 5.81 323.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 30.19 3.5 105.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.06SUMINISTRO E INSTALACION TUB, PVC SAP Q 1/2" C-10 ML 1728.4 6.95 12,012.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.07SALIDA DE AGUA FRIA 1/2" PTO 58.00 21.65 1,255.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.08LLAVE DE PASO Q 1/2" Und 58.00 47.33 2,745.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.09GRIFO CROMADO DE 1/2" Und 58.00 29.37 1,703.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.10SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE AGUA FRIGLB 58.00 114.70 6,652.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.11SUMINISTRO E INSTALACION ACCESORIOS CAJA DE VALVULA C Und 58.00 95.92 5,563.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02 SISTEMA DE DESAGUE
01.03.05.07.03.02.01EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 177.13 10.73 1,900.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.02CAMA DE APOYO CON TIERRA CERNIDA E=0.10M M3 32.36 6.44 208.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 116.51 11.45 1,334.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.04RELLENO COMPACTADO CON MATERIAL PROPIO M3 38.84 5.81 225.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 57.21 3.50 200.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.06TUBERIA PVC SAL DE 2" ML 939.60 6.75 6,342.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.07TUBERIA PVC SAL DE 4" ML 742.40 10.91 8,099.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.08SALIDA DE DESAGUE PVC SAL 2" M2 174.00 30.98 5,390.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.09SALIDA DE DESAGUE PVC SAL 4" KG 116.00 58.19 6,750.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.10SALIDA DE VENTILACION EN PVC SAL 2" M2 58.00 59.22 3,434.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.11SUMIDERO C/TRAMPA PVC SAL 2" M3 116.00 30.64 3,554.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.12SUMIDERO C/TRAMPA "P" CON REGISTRO UND 58.00 43.08 2,498.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.13REGISTRO DE BRONCE 4" Und 58.00 35.06 2,033.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.14SUMINISTRO E INSTALACION DE ACCESORIO SISTEMA DE DESAGM3 58.00 204.64 11,869.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.15COLOCACION DE CAJA DE REGISTRO DE 12"x24" ML 58.00 135.20 7,841.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.03 APARATOS SANITARIO Y ACCESORIOS
01.03.05.07.03.03.01IDORO BLANCO 6.0 LITROS PZA 58.00 194.99 11,309.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.03.02LAVATORIO DE PARED BLANCO 1 LLAVE PZA 58.00 141.81 8,224.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.03.03DUCHA CON TERMA ELECTRICA PZA 58.00 149.07 8,646.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.04 INSTALACIONES ELECTRICAS
01.03.05.07.03.0.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3PTO 58.00 56.06 3,251.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.0.02 SALIDA DE INTERRUPTOR PTO 58.00 32.61 1,891.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.0.03 SALIDA DE PARED PARA TERMA PTO 58.00 71.02 4,119.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.0.04 TABLERO DE DISTRIBUCION DE 02 LLAVES Und 58.00 84.85 4,921.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.0.05 ACOMETIDA DESDE VIVIENDA PROM=15.00M ML 1160.00 2.09 2,424.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08 UBS CON LETRINAS DE ARRASTRE HIDRAULICO Y BIODIGESTOTORES (04 UNID)
01.03.05.08.01 ESTRUCTURAS
01.03.05.08.01.01 TRABJAJOS PRELIMINARES
01.03.05.08.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 158.72 0.45 71.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.01.02TROZO, NIVELACION Y REPLANTEO M2 102.19 1.89 193.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02 MOVIMIENTO DE TIERRA 0.00 0.00 0.00 #DIV/0! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02.01EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 30.53 13.80 421.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02.02PERFILADO Y COMPACTADO EN FUNDACIONES M2 17.80 1.72 30.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02.03RELLENO COMPACTADO CON MATERIAL PROPIO M3 12.94 5.81 75.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02.04ELIMINACION MANUAL MATERIAL EXC.PM=30M M3 28.43 3.5 99.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03 OBRAS DE CONCRETO SIMPLE
01.03.05.08.01.03.01CIMIENTOS CORRIDOS MEZCLA CH-1.10 +30% PG M3 7.56 166.05 1,255.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03.02SOBRE CIMIENTOS CORRIDOS MEZCLA CH-1.18 +25% P.M M3 1.17 196.96 230.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03.03FALSO PISO DE 4" CON MEZCLA C.H-1.8 M2 11.59 28.15 326.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03.04CONCRETO FC=175KG/CM2 (SIN MEZCLADORA) M3 1.51 341.89 516.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03.05ENCOFRADO Y DESENCOFRADO, SOBRE CIMIENTOS M3 33.62 30.99 1,041.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04 OBRAS DE CONCRETO ARMADO
01.03.05.08.01.04.01LAVADERO DE CONCRETO
01.03.05.08.01.04.01CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 1.10 371.95 409.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.01ACERO FY=4200 KG/CM2 KG 19.06 29.65 565.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.01ENCOFRADO Y DESENCOFRADO LOSA M2 152.76 4.71 719.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.02COLUMNAS
01.03.05.08.01.04.02CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.98 371.95 364.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.02ENCOFRADO Y DESENCOFRADO M2 24.96 39.25 979.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.02ACERO FY=4200 KG/M2 KG 172.76 4.71 813.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.03VIGAS
01.03.05.08.01.04.03CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.94 371.95 349.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.03ENCOFRADO Y DESENCOFRADO CV. COLUMNAS M2 13.36 40.15 536.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.03ACERO FY=4200 KG/M2 KG 219.88 4.71 1,035.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.04CAJA VALVULA DE CONTROL
01.03.05.08.01.04.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 0.11 341.89 37.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.03 371.95 11.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.04ENCOFRADO Y DESENCOFRADO M2 4.96 20.03 99.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.04ACERO FY=4200 KG/M2 KG 10.55 4.71 49.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.05ESTRUCTURA MADERA TECHO
01.03.05.08.01.04.05VIGA DE APOYO DE MADERA 2"x2"x2.10M P2 43.41 9.42 408.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.05CORREAS DE MADERA 2"x2"X3m P2 41.34 6.96 287.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02 ARQUITECTURA
01.03.05.08.02.01 MURO Y TABIQUES DE ALBAÑILERIA
01.03.05.08.02.01.01MURO DE SOGA CON LADRILLO DE ARCILLA 0.09x0.12x3.00 M. M2 47.96 55.22 2,648.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.02 REBOQUES EN LUCIDOS Y MOLDURAS
01.03.0508..02.02.01TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 29.88 22.63 676.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.0508..02.02.02FROTACHADOS Y ACABOS MUROS CARAVISTAS EXTERIORES M2 45.16 6.26 282.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.0508..02.02.03TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM / PULIDO C M2 26.40 31.31 826.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.0508..02.02.04TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 22.46 24.91 559.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.0508..02.02.05TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM / PULIDO C M2 15.24 30.18 459.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.03 ZOCALOS
01.03.05.08.02.03.01ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 2.56 30.18 77.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.04 COTRAZOCALOS
01.03.05.08.02.04.01CONTRAZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 4.60 30.18 138.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.05 PISO Y PADIMENTOS
01.03.05.08.02.05.01PISOS DE CEMENTO PULIDO Y BRUÑADO E=2" CON OCRE M2 11.52 30.08 346.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.06 COBERTURA
01.03.05.08.02.06.01COBERTURA CON PLANCHA ENTERNIT DE 1.10x2.44x4MM M2 29.57 45.23 1,337.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.07 CARPINTERIA DE MADERA
01.03.05.08.02.07.01PUERTA DE MADERA MACHIHEMBRADA M2 6.72 249.03 1,673.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.07.02VENTANA DE MADERA CON MALLA MOSQUITERO M2 1.08 121.32 131.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.08 CERRAJERIA
01.03.05.08.02.08.01CERRAJERIA TIPO PEDILLA PARA BAÑOS UNID 4.00 45.00 180.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.08.02BIZAGRA ALUMINIZADA CAPUCHINA DE 4"x4" UNID 12.00 13.28 159.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.09 PINTURA
01.03.05.08.02.09.01PINTURA ESMALTE EN EXTERIORES 2 MANOS M2 35.02 8.31 291.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.09.02PINTURA ESMALTE EN EXTERIORES 2 MANOS M2 62.46 8.06 503.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.09.03PINTRURA ESMALTE EN ZOCALOS H=O.20 M M2 7.16 7.52 53.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03 INSTALACIONES SANITARIA
01.03.05.08.03.01 SISTEMA DE AGUA FRIA
01.03.05.08.03.01.01EXCAVACIONES MANUAL EN MATERIAL COMPACTO M3 9.74 10.73 104.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 1.60 6.44 10.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 5.76 11.45 65.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.04RELLENO COMPACTADO CON MATERIAL PROPIO M3 3.84 5.81 22.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 2.08 3.50 7.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.06SUMINISTRO E INSTALACION TUB, PVB, SAP, Q 1/2" C-10 ML 119.20 6.95 828.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.07SALIDA DE AGUA FRIA 1/2 PTO 4.00 21.65 86.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.08LLAVE DE GRIFO Q1/2 UNID 4.00 47.33 189.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.09GRIFO CROMADO DE 1/2 UNID 4.00 29.37 117.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.10SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE AGUA FRIGLB 4.00 114.70 458.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.11SUMINISTRO E INSTALACION ACCESORIOS CAJA DE VALVULA COUND 4.00 95.92 383.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02 SISTEMA DE DESAGUE
01.03.05.08.03.02.01EXCAVACION MANUAL ZANJA EN MATERIAL COMPACTADO M3 12.22 10.73 131.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 2.23 6.44 14.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 8.04 11.45 92.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.04RELLENO COMPACTADO CON MATERIAL PROPIO ME 2.68 5.81 15.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 3.95 3.50 13.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.06TUBERIA PVC DE 2 ML 64.80 6.75 437.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.07TUBERIA PVC DE 4 ML 51.20 10.91 558.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.08SALIDA DE DESAGUE EN PVC SAL 2 PTO 12.00 30.98 371.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.09SALIDA DE DESAGUE EN PVC SAL 4 PTO 8.00 58.19 465.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.10SALIDA DE VENTILACION EN PVC 2 PTO 4.00 59.22 236.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.11SUMIDERO C/TRAMPA PVC SAL 2 UNID 8.00 30.64 245.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.12SUMIDERO C/TRAMPA "P" CON REGISTRO UNID 4.00 43.08 172.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.13REGISTRO DE BRONCE 4 UNID 4.00 35.06 140.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.14SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE DESAGU GLB 4.00 204.64 818.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.15COLOCACION DE CAJA DE REGISTRO DE 12x24" UNID 4.00 135.20 540.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.03 APARATOS SANITARIOS Y ACCESORIOS
01.03.05.08.03.03.01INODORO BLANCO 6.0 LITROS PZA 4.00 194.99 779.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.03.02LAVATORIO DE PARED BLANCO 1 LLAVE PZA 4.00 141.81 567.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.03.03DUCHA CON TERMA ELLETRICA PZA 4.00 149.07 596.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04 INSTALACION ELECTRICAS
01.03.05.08.04.01 SALIDA DE TECHO C/CABLE TW 2.5MM(14)+PVC SEL 19MM(3/4) PTO 4.00 56.06 224.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04.02 SALIDA DE INTERRUPTOR C7CABLE AWG TW 2.5MM(14)+D PVC SELPTO 4.00 32.61 130.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04.03 SALIDA PARED PARA TERMA C/CABLE AWG TW 2.5MM(12)+D PVC PSTO 4.00 71.02 284.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04.04 TABLERO DE DISTRIBUCION DE 02 LLAVES UNID 4.00 84.85 339.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04.05 ACOMETIDA DESDE VIVIENDA PROM=15.0M.(2.1x2.5MM THW) ML 80.00 2.09 167.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05 BIODIGESTOR
01.03.05.08.05.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 17.00 13.80 234.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 42.50 1.72 73.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.03 RELLENO COMPACTADO CON MATERIAL PROPIO M3 12.07 5.81 70.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.04 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 6.22 3.50 21.77 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.05 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 0.06 341.89 20.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.06 ACERO FY=4200 KG/M2 KG 14.11 4.71 66.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.07 BIODIGESTOR DE 600L.T.(INC.ACCESORIOS E INSTALACION) UNID 4.00 2005.32 8,021.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06 CAJA DE REGISTRO LODOS
01.03.05.08.06.01 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 1.54 13.8 21.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06.02 CONCRETO FC=175KG/CM2 (SIN MEZCLADORA) M3 1.13 341.89 386.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06.03 ENCOFRADO Y DESENCOFRADO M2 11.76 20.03 235.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06.04 TARRAJEO E IMPERMEABILIZACION MEZCLA CA-1.5,E=1.5CM M2 5.92 23.06 136.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06.05 INSTALACION TAPA METALICA ESTRIADA DE 75x0.75M Und 4.00 147.00 588.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07 POZO PERCOLADOR BOL=1.50M3
01.03.05.08.07.01 TRABJAJOS PRELIMINARES
01.03.05.08.07.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 23.04 0.45 10.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.01.02TROZO, NIVELACION Y REPLANTEO M2 7.84 1.89 14.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02 MOVIMIENTO DE TIERRA
01.03.05.08.07.02.01CORTE DE TERRENO MANUAL P/NIVLECION M3 5.76 13.65 78.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.02EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 17.42 13.80 240.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.03PERFILADO Y COMPACTADO EN FUNDACIONES M2 37.36 1.72 64.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.04CAMA DE APOYO CON TIERRA CERNIDA E=0.10M M3 0.30 6.44 1.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.05RELLENO COMPACTADO CON MATERIAL PROPIO M3 8.21 5.81 47.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.06ELIMINACION MANUAL MATERIAL EXC.PM=30M M3 19.61 3.50 68.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.03 OBRAS DE CONCRETO SIMPLE
01.03.05.08.07.03.01CONCRETO FC=175KG/CM2 + 30% P.M (SIN MEZCLADORA) M3 0.95 246.24 233.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.03.02CONCRETO FC=175KG/CM2 (SIN MEZCLADORA) M3 0.10 341.89 34.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.03.03ENCOFRADO Y DESENCOFRADO DADOS M2 1.14 26.86 30.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04 OBRAS DE CONCRETO ARMADO
01.03.05.08.07.04.01LOSA TECHO
01.03.05.08.07.04.01CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 0.73 371.95 271.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.01ACERO FY=4200 KG/CM2 KG 46.48 4.71 218.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.01ENCOFRADO Y DESENCOFRADO LOSA M2 9.08 36.94 335.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.02TAPA DE CONCRETO
01.03.05.08.07.04.02CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 0.30 371.95 111.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.02ACERO FY=4200 KG/CM2 KG 38.11 4.71 179.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.02ENCOFRADO Y DESENCOFRADO TAPA M2 5.88 26.86 157.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.05 FILTROS
01.03.05.08.07.05.01MURO CILINDRICO CON LADRILLO CORRIENTE CON CABEZA Y M M2 15.36 103.18 1,584.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.05.02GRAVA FILTRANTE CON PIEDRA CHANCADA DE 1/2" M3 2.46 112.88 277.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.05.03GRAVA FILTRANTE CON PIEDRA SELECCIONADA DE RIO 2" M3 0.48 49.88 23.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.06 INSTALACIONES SANITARIAS
01.03.05.08.07.06.01SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS (PERCOLUnd 4.00 83.57 334.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04 SUB SISTEMA DE SANEAMIENTO BASICO- CALLIPATA BAJA
01.04.01 LINEA DE CONDUCCION CON TUBERIA PVC SAP (L=150.96 ML)
01.04.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL ML 150.96 0.22 33.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.02 TRAZO NIVELACION Y REPLANTEO KM 0.15 452.65 67.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.03 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 150.96 0.85 128.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.04 EXCAVACION MANUAL ZANJA E MATERIAL COMPACTO M3 59.47 10.73 638.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.05 EXCAVACION MANUAL ZANJA EN ROCA SUELTA : PERFORACION M3 0.40 24.40 9.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.06 EXCAVACION MANUAL ZANJA EN ROCA FIJA : PERFORACION Y V M3 0.40 34.61 13.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.07 LIMPIEZA DE MATERIAL RESULTANTE DE VOLADURA M3 1.00 12.90 12.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.08 REFINE Y NIVELACION DE FONDO ZANJA EN MATERIAL COMPACTML 148.69 0.28 41.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.09 REFINE Y NIVELACION DE FONDO ZANJA EN ROCA SUELTA ML 1.00 0.78 0.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.10 REFINE Y NIVELACION DE FONDO ZANJA EN ROCA FIJA ML 1.00 1.18 1.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.11 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 7.55 6.44 48.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.12 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 27.17 11.45 311.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.13 RELLENO COMPACTADO CON MATERIAL PROPIO M3 55.48 5.81 322.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.14 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 1.50" C-7.5 ML 158.51 6.97 1,104.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.15 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 193.98 193.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.16 PRUEVA HIDRAULICA Y DESIFECCION DTUBERIA ML 150.96 0.45 67.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02 OBRAS DE ARTE LINEA DE CONDUCCION
01.04.02.01 CAMARA CAPTACION MANANTE C-01 (01 UND.)
01.04.02.01.01 LIMPIEZA DE TERRRO MANUAL M2 24.94 0.45 11.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.02 TRAZO Y REPLANTEO PRELIMINAR M2 8.13 1.89 15.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 5.17 13.80 71.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.04 PERFILADO Y COMPACTADO EN FUNDACIONES M2 7.16 1.72 12.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO M3 1.57 5.81 9.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.06 ELIMINACION MANUAL MATERIAL EXC.PM=30M M3 4.63 3.50 16.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.07 ENCOFRADO PERIMETRAL CON MEDIANATAM 4"Y6" M3 0.77 61.07 47.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.08 FILTRO CON PIEDRA PEQUEÑA TAM MX 2" M3 0.13 56.00 7.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.09 FILTRO CON GRAVA SELECCINADA DE 3/4" -1" M3 0.27 114.50 30.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.10 FILTRO CON GRAVA SELECCINADA DE 1/2" M3 0.93 56.58 52.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.11 CONCRETO FC=1OOKG/CM2 SOLDADO (SIN MEZCLADORA) M3 0.03 212.44 6.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.12 CONCRETO FC=175KG/CM2 (SIN MEZCLADORA) M3 1.23 341.89 420.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.13 CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 0.82 371.95 305.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.14 ENCOFRADO Y DESENCOFRADO M2 17.59 20.03 352.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.15 TARRAJEOEN INTERIORES Y EXTERIORES MEZCLA C.A-1.5.E=1.5 M3 5.36 20.43 109.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.16 TARRAJEO E IMPERMEABILIZACION MEZCLA CA-1.5,E=1.5CM M3 2.89 23.06 66.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.17 PINTURA ESMALTE EN EXTERIORES M2 1.46 7.14 10.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.18 INSTALACION TUBERIAS DE INGRESO PVC Q=2" PERFORADO UNID 1.00 59.6 59.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.19 INSTALACION TUBERIAS DE SALIDA CON VALVULAS Q 1" UNID 1.00 138.31 138.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.20 INSTALACION TUBERIAS SISTEMA LIMPIA Y REBOSE Q=2" UNID 1.00 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.21 INSTALACION TAPA METALICA ESTRADA DE 75x0.75M UNID 1.00 266.25 266.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.22 INSTALACION TAPA METALICA ESTRADA DE 55x0.40M UNID 1.00 177.5 177.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02 VALVULAS DE PURGA Q 1" TIPO I - LINEA DE CONDUSCCION (01UNID)
01.04.02.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 8.28 0.45 3.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.02 TRAZO NIVELACION Y REPLANTEO M2 1.84 2.87 5.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.03 EXCAVACION PARA ESTRUTUTAS EN MATERIAL COMPACTADO M3 1.30 19.32 25.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.04 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 1.50 1.36 2.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.05 PERFILADO Y CONPACTADO EN FUNDACIONES M3 0.12 8.05 0.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.06 RELLENO COMPACTADO EN FUNDACIONES M2 0.43 14.71 6.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.48 6.69 3.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.98 3.50 3.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.09 CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 0.31 347.14 107.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.10 ENCOFRADO Y DESENCOFRADO M2 5.11 30.80 157.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5M2 1.45 20.85 30.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.12 ACERO FY=4200 KG/CM2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.13 SUMINISTRO E INSTALACION VALVULAS Y ACCESORIOS Q 1.5"/ QUNID 1.00 216.72 216.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03 RESERVORIO RECTANGULAR APOYADO CAP=2.00 M3 (01 UNID)
01.04.02.03.01 TRABAJOS PRELIMINARES
01.04.02.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 30.00 0.45 13.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.01.02 TRAZO NIVELACION Y REPLANTEO M2 8.52 1.89 16.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02 MOVIMIENTO DE TIERRAS
01.04.02.03.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M2 19.63 13.80 270.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 20.52 1.72 35.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.5 6.44 3.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 1.5 11.45 17.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 9.66 5.81 56.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 14.88 3.50 52.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.03 OBRAS DE CONCRETO SIMPLE
01.04.02.03.03.01 CONCRETO F C=100 KG/M2 +30P.M (SIN MEZCLADORA) M3 0.32 212.44 67.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.05 341.89 17.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.04 OBRAS DE CONCRETO ARMADO
01.04.02.03.04.01 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 3.73 371.95 1,387.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.04.02 ENCOFRADO Y DESENCOFRADO M2 31.60 20.03 632.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.04.03 ACERO FY=4200 KG/M2 KG 442.40 4.71 2,083.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.02.03.05.01 TARRAJEO EN EXTERIORES MEZCLA E=1.5 CM. PULIDO CON OCRM2 17.36 20.43 354.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 10.37 23.06 239.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.05.03 MORTERO 1.5 E=2.5" CM, PARA PENDIENTES DE FONDO M2 3.03 20.45 61.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.06 PINTURA .
01.04.02.03.06.01 PINTURA ESMALTE EN EXTERIORES M2 9.98 7.14 71.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07 VARIOS
01.04.02.03.07.01 INSTALACION INGRESO Y BY PASS CON TUB. PVC SAP Q=1" Und 1.00 449.47 449.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07.02 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q=1" Und 1.00 335.57 335.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07.03 INSTALACION DE SISTEMA DE LIMPI Y REBOSE Q=2" Und 1.00 285.86 285.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07.04 SUMINISTRO E INSTALACION DE ESCALERAS H=1.10 M.E HIPOCL Und 1.00 648.00 648.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 1.44 61.07 87.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08 CERCO PERIMETRICO
01.04.02.03.08.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 18.00 0.45 8.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.02 TRAZO NIVELACION Y REPLANTEO M2 7.20 1.89 13.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.03 EXCAVACION PARA ESTRUTUTAS EN MATERIAL COMPACTADO M3 0.83 13.80 11.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.04 CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 0.81 246.24 199.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.05 SUMINISTRO E INSTALACION DE RODILLOS DE MADERA L=2.10Mx4 UNID 8.00 14.10 112.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 151.20 1.33 201.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.07 INSTALACION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) UNID 1.00 66.87 66.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03 LINEA DE ADUCCION Y RED DE DISTRIBUCION CON TUBERIA PVC SAP
01.04.03.01 RED DE DISTRIBUCION CON TUBERIA PVC SAP (L=871.96mL)
01.04.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL ML 871.96 0.22 191.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.02 TRAZO NIVELACION Y REPLANTEO KM 0.87 452.65 393.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.03 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 871.96 0.85 741.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.04 EXCAVACION MANUAL ZANJA E MATERIAL COMPACTO M3 348.78 10.73 3,742.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.05 REFINE Y NIVLACION FONDO ZANJA EN MATERIAL COMPACTADOML 871.96 0.28 244.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.06 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 43.60 6.44 280.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.07 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 156.95 11.45 1,797.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.08 RELLENO COMPACTADO CON MATERIAL PROPIO M3 125.56 5.81 729.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.09 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 2" C-10 ML 523.33 4.23 2,213.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.10 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 1" C-10 ML 392.23 4.07 1,596.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.11 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 777.38 777.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.12 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 871.96 0.45 392.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02 OBRA DE ARTE RED DE DISTRIBUCION
01.04.03.02.01 CAMARA DE ROMPE PRESIONES Q 2" TIPO -VIP (01 UNID)
01.04.03.02.01.01 TRABAJOS PRELIMINARES
01.04.03.02.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 11.57 0.45 5.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.01.02TRAZO DE NIVELACION Y REEMPLANTEO M2 3.39 1.89 6.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02 MOVIMIENTO DE TIERRAS
01.04.03.02.01.02.01ESCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 8.31 13.80 114.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 2.37 1.72 4.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.03CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.25 6.44 1.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.04RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 0.75 11.45 8.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.05RELLENO COMPACTO CON MATERIAL PROPIO M3 4.25 5.81 24.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.06ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 6.14 3.50 21.49 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.03 OBRAS DE CONCRETO SIMPLE
01.04.03.02.01.03.01CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.09 212.44 19.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.03.02CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.06 341.89 20.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.04 OBRAS DE CONCRETO ARMADO
01.04.03.02.01.04.01CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 1.10 371.95 409.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.04.02ENCOFRADO Y DESENCOFRADO M2 12.45 20.03 249.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.04.03ACERO FY=4200 KG/M2 KG 79.04 4.71 372.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.03.02.01.05.01TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 5.18 20.43 105.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.05.02TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 3.30 23.06 76.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.06 PINTURA
01.04.03.02.01.06.01PINTURA ESMALTE EN EXTERIORES M2 3.33 7.14 23.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.07 VALVULAS Y ACCESORIOS
01.04.03.02.01.07.01INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 1.00 267.84 267.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.07.02INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 1.00 45.76 45.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.07.03INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1.00 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.08 VARIOS
01.04.03.02.01.08.01ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 0.37 61.07 22.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02 VALVULA DE CONTROL DE Q 1" RED DE DISTRIBUCION (01 UNID)
01.04.03.02.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.02 TRAZO NIVELACION Y REPLANTEO M3 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M2 1.01 13.8 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.04 PERFILADO Y CONPACTADO EN FUNDACIONES M3 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.10 ENCOFRADO Y DESENCOFRADO M3 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 1.45 20.43 29.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (CUnd 1.00 101.22 101.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03 VALVULA DE CONTROL DE D=34" RED DE DISTRIBUCION (01 UNID)
01.04.03.02.03.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.02 TRAZO NIVELACION Y REPLANTEO M2 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAM3 1.01 13.80 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.06 RELLENO COMPACTODO CON MATERIAL SELECCIONADO M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.10 ENCOFRADO Y DESENCOFRADO M2 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 1.45 20.43 29.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (CUnd 1.00 99.82 99.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04 VALVULA DE PURGA DE Q 1" / Q 3/4" TIPO II .RED DE DISTRIBUCION (02 UNID)
01.04.03.02.04.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 16.56 0.45 7.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.02 TRAZO NIVELACION Y REPLANTEO M2 3.68 1.89 6.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 2.59 13.80 35.74 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 3.00 1.72 5.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.24 6.44 1.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 0.86 11.45 9.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.96 5.81 5.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 1.96 3.50 6.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.61 341.89 208.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.10 ENCOFRADO Y DESENCOFRADO M2 10.21 20.03 204.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 2.89 20.43 59.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.12 ACERO FY=4200 KG/M2 KG 9.99 4.71 47.05 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 1" / QUnd 2.00 115.66 231.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03 CONEXIONES DOMICILIARIAS-LAVADERO DE CONCRETO (09 UNID)
01.04.03.03.01 TRABAJOS PRELIMINARES
01.04.03.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 113.85 0.45 51.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.01.02 TRAZO DE NIVELACION Y REEMPLANTEO M2 57.96 1.89 109.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02 MOVIMIENTO DE TIERRAS
01.04.03.03.02.01 ESCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 39.56 13.80 545.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 14.76 1.72 25.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 3.60 6.44 23.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 10.80 11.45 123.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 10.80 5.81 62.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 36.68 3.50 128.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.03 OBRAS DE CONCRETO SIMPLE
01.04.03.03.03.01 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.85 246.24 209.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.04 OBRAS DE CONCRETO ARMADO
01.04.03.03.04.01 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 2.16 371.95 803.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.04.02 ENCOFRADO Y DESENCOFRADO M2 43.54 20.03 872.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.04.03 ACERO FY=4200 KG/M2 KG 293.97 4.71 1,384.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.03.03.05.01 TARRAJEO EN EXTERIORES MEZCLA E=1.5CM-PULIDO CON OCREM2 33.49 30.18 1,010.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.06 VARIOS
01.04.03.03.06.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 1.35 61.07 82.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.06.02 POZO DRENAJE DE AGUAS SERVIDAS (1.0x1.0x1.20M) UNID 9.00 79.50 715.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.07 CAJA DE VALVULAS DE CONTROL
01.04.03.03.07.01 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.24 341.89 82.05 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.07.02 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 0.06 371.95 22.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.07.03 ENCOFRADO Y DESENCOFRADO M2 11.16 20.03 223.53 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.07.04 ACERO FY=4200 KG/M2 KG 23.75 4.71 111.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.08 INSTALACION SANITARIA
01.04.03.03.08.01 SISTEMA DE AGUA FRIA
01.04.03.03.08.01.01INSTALACION ACCESORIOS SISTEMA DE AGUA FRIA UNID 9.00 135.12 1,216.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.08.02 SISTEMA DE DESAGUE
01.04.03.03.08.02.01INSTALACION ACCESORIOS SISTEMA DE DESGUE Y DRENAJE UNID 9.00 92.68 834.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.08.03 CONEXIÓN A RED PUBLICA
01.04.03.03.08.03.01SUNIMISTRO E INSTALACION VALVULAS DE CONTROL DE 3/4" UNID 9.00 129.66 1,166.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04 AMPLIACION Y MEJORAMIENTO SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS
01.04.03.04.01 UBS CON LETRINAS DE ARRASTRE HIDRAULICO Y BIODIGESTOR (09 UNID)
01.04.03.04.01.01 ESTRUCTURA
01.04.03.04.01.01.01TRABAJOS PRELIMINARES
01.04.03.04.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 357.12 0.45 160.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.01TRAZO NIVELACION Y REPLANTEO M2 229.93 1.89 434.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.02MOVIMIENTO DE TIERRAS
01.04.03.04.01.01.02EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 69.69 13.80 961.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 40.05 1.72 68.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.02RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 29.12 5.81 169.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.02ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 63.96 3.50 223.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03OBRAS DE CONCRETO SIMPLE
01.04.03.04.01.01.03CIMIENTOS CORRIDOS MEZCLA C;H-1.10 +30% PG. M3 17.01 166.05 2,824.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03SOBRE CIMIENTOS MEZCLA C;H 1.8 +25% P.M M3 2.64 196.96 519.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03FALSO PISO DE 4" CON MEZCLA C;H - 1.8 M2 26.08 28.15 734.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 3.41 341.89 1,165.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03ENCOFRADO Y DESENCOFRADO M2 75.65 30.99 2,344.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04OBRAS DE CONCRETO ARMADO
01.04.03.04.01.01.04LAVADERO DE CONCRETO
01.04.03.04.01.01.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 2.47 371.95 918.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ENCOFRADO Y DESENCOFRADO M2 42.89 29.65 1,271.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ACERO FY=4200 KG/M2 KG 343.72 4.71 1,618.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04COLUMNAS
01.04.03.04.01.01.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 2.21 371.95 822.01 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ENCOFRADO Y DESENCOFRADO M2 56.16 39.25 2,204.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ACERO FY=4200 KG/M2 KG 388.08 4.71 1,827.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04VIGAS
01.04.03.04.01.01.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 2.11 371.95 784.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ENCOFRADO Y DESENCOFRADO M2 30.07 40.15 1,207.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ACERO FY=4200 KG/M2 KG 494.73 4.71 2,330.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04CAJA VALVULA DE CONTROL
01.04.03.04.01.01.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 0.24 341.89 82.05 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.06 371.95 22.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ENCOFRADO Y DESENCOFRADO M2 11.16 20.03 223.53 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ACERO FY=4200 KG/M2 KG 23.45 4.71 110.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ESTRUCTURA MADERA TECHO
01.04.03.04.01.01.04VIGA DE APOYO DE MADERA 2"x2"x2.10M P2 97.66 9.42 919.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04CORREAS DE MADERA 2"x2"X3.00m P2 93.01 6.96 647.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02 ARQUITECTURA
01.04.03.04.01.02.01MUROS Y TABIQUE SE ALBAÑERIA
01.04.03.04.01.02.01MUROS DE SOGA CON LADRILLO DE ARCILLA 0..09x0.12x0.24 M M2 107.91 55.22 5,958.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02REVOQUES ENLUCIDOS Y MOLDURAS
01.04.03.04.01.02.02TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 67.23 22.63 1,521.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02FROTACHADO Y ACABADOS MUROS CARAVISTAS EXTERIORES M3 101.61 6.26 636.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM/PULIDO CO M2 59.40 31.31 1,859.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02TARRAJEO DE VIGAS Y COLUMNAS MEZCLA C.A-1.5,E=1.5 CM M2 50.54 24.91 1,258.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02TARRAJEO EN EXTERIORES MEZCLA C.A-1.5,E=1.5 CM7PULIDO C M2 34.28 30.18 1,034.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.03ZOCALOS
01.04.03.04.01.02.03ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 5.76 30.18 173.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.04CONTRAZOCALOS
01.04.03.04.01.02.04CONTRA ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 10.35 30.18 312.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.05PISOS Y PAVIMENTOS
01.04.03.04.01.02.05PISO DE CEMENTO PULIOD Y BRUÑADO E=2" CON OCRE M2 25.92 30.08 779.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.06COBERTURA
01.04.03.04.01.02.06COBERTURA CON PLANCHA ENTERNIT DE 1.10x2.44x4M (ONDA 100M2 66.53 45.23 3,009.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.07CARPINTERIA DE MADERA
01.04.03.04.01.02.07PUERTA DE MADERA MACHIHEMBRADA M2 15.12 249.03 3,765.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.07VENTANA DE MADERA CON MALLA MOSQUITERO M2 2.43 121.32 294.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.08CERRAJERIA
01.04.03.04.01.02.08CERRADURA TIPO PEDILLA PARA BAÑOS UNID 9.00 45.00 405.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.08BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4" UNID 27.00 13.28 358.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.09PINTURA
01.04.03.04.01.02.09PINTURA AL LATEX MATE INTERIORES 2 MANOS M2 78.84 8.31 655.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.09PINTURA AL LATEX MATE EXTERIORES 2 MANOS M2 140.54 8.06 1,132.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.09PINTURA ESMALTE EN ZOCALOS H=0.20M M2 16.11 7.52 121.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03 INTALACIONES SANITARIAS
01.04.03.04.01.03.01SISTEMA DE AGUA FRIA
01.04.03.04.01.03.01EXCAVACIONES MANUAL EN MATERIAL COMPACTO M3 21.90 10.73 234.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 3.60 6.44 23.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 12.96 11.45 148.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01RELLENO COMPACTADO CON MATERIAL PROPIO M3 8.64 5.81 50.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 4.68 3.5 16.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01SUMINISTRO E INSTALACION TUB, PVB, SAP, Q 1/2" C-10 ML 268.20 6.95 1,863.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01SALIDA DE AGUA FRIA 1/2" PTO 9.00 21.65 194.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01LLAVE DE PASO Q1/2" UNID 9.00 47.33 425.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01GRIFO CROMADO DE 1/2" UNID 9.00 29.37 264.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE AGUA FRIGLB 9.00 114.70 1,032.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01SUMINISTRO E INSTALACION ACCESORIOS CAJA DE VALVULA COUNID 9.00 95.92 863.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SISTEMA DE DESAGUE
01.04.03.04.01.03.02EXCAVACION MANUAL ZANJA EN MATERIAL COMPACTADO ME 27.49 10.73 294.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 5.02 6.44 32.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 18.08 11.45 207.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02RELLENO COMPACTADO CON MATERIAL PROPIO M3 6.03 5.81 35.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 8.88 3.5 31.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02TUBERIA PVC DE 2 ML 145.8 6.75 984.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02TUBERIA PVC DE 4 ML 115.20 10.91 1,256.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SALIDA DE DESAGUE EN PVC SAL 2 PTO 27.00 30.98 836.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SALIDA DE DESAGUE EN PVC SAL 4 PTO 18.00 58.19 1,047.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SALIDA DE VENTILACION EN PVC 2 PTO 9.00 59.22 532.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SUMIDERO C/TRAMPA PVC SAL 2 UNID 18.00 30.64 551.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SUMIDERO C/TRAMPA "P" CON REGISTRO UNID 9.00 43.08 387.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02REGISTRO DE BRONCE 4 UNID 9.00 35.06 315.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE DESAGU GLB 9.00 204.64 1,841.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02COLOCACION DE CAJA DE REGISTRO DE 12x24" UNID 9.00 135.20 1,216.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.03APARATOS SANITARIOS Y ACCESORIOS
01.04.03.04.01.03.03INODORO BLANCO 6.0 LITROS PZA 9.00 194.99 1,754.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.03LAVATORIO DE PARED BLANCO 1 LLAVE PZA 9.00 141.81 1,276.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.03DUCHA CON TERMA ELLETRICA PZA 9.00 149.07 1,341.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04 INSTALACIONES ELECTRICAS
01.04.03.04.01.04.01SALIDA DE TECHO C/CABLE TW 2.5MM(14)+PVC SEL 19MM(3/4) PTO 9.00 56.06 504.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04.02SALIDA DE INTERRUPTOR C7CABLE AWG TW 2.5MM(14)+D PVC SEL
PTO 9.00 32.61 293.49 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04.03SALIDA PARED PARA TERMA C/CABLE AWG TW 2.5MM(12)+D PVC P
STO 9.00 71.02 639.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04.04TABLERO DE DISTRIBUCION DE 02 LLAVES UNID 9.00 84.85 763.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04.05ACOMETIDA DESDE VIVIENDA PROM=15.0M.(2.1x2.5MM THW) ML 180.00 2.09 376.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05 BIODIGESTOR
01.04.03.04.01.05.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 38.25 13.80 527.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 95.63 1.72 164.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.03RELLENO COMPACTADO CON MATERIAL PROPIO M3 27.16 5.81 157.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.04ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 14.00 3.50 49.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.05CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 0.14 341.89 47.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.06ACERO FY=4200 KG/M2 KG 31.75 4.71 149.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.07BIODIGESTOR DE 600L.T.(INC.ACCESORIOS E INSTALACION) UNID 9.00 2005.32 18,047.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06 CAJA DE REGISTRO LODOS
01.04.03.04.01.06.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 3.46 13.80 47.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06.02CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 2.53 341.89 864.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06.03ENCOFRADO Y DESENCOFRADO M2 26.46 20.03 529.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06.04TARRAJEO E IMPLEMETACION MEZCLA C.A-1.5,E=1.6 CM M2 13.32 23.06 307.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06.05INSTALACION TAPA METALICA ESTRADA DE 75x0.75M UNID 9.00 147.00 1,323.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07 POZO PERCOLADOR VOL=1.50 M3
01.04.03.04.01.07.01TRABAJOS PRELIMINARES
01.04.03.04.01.07.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 51.84 0.45 23.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.01TRAZO NIVELACION Y REPLANTEO M2 17.64 1.89 33.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02MOVIMIENTO DE TIERRAS
01.04.03.04.01.07.02CORTE DE TERRRENO MANUAL P/NIVELACION M3 12.96 13.65 176.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02ESCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 39.20 13.80 540.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 84.06 1.72 144.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.68 6.44 4.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02RELLENO COMPACTADO CON MATERIAL PROPIO M3 18.47 5.81 107.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 44.11 3.50 154.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.03OBRAS DE CONCRTO SIMPLE
01.04.03.04.01.07.03CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 2.13 246.24 524.49 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.03CONCRETO FC=140 KG/CM2 (SIN MEZCLADORA) M3 0.23 341.89 78.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.03ENCOFRADO Y DESENCOFRADO M2 2.57 26.86 69.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04OBRAS DE CONCRETO ARMADO
01.04.03.04.01.07.04LOSA TECHO
01.04.03.04.01.07.04CONCRETO PC=210 KG/CM2 (SIN MEZCLADORA) Und 1.64 371.95 610.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04ACERO FY=4200 KG/M2 Und 104.57 4.71 492.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04ENCOFRADO Y DESENCOFRADO LOSA Und 20.43 36.94 754.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04TAPA DE CONCRETO
01.04.03.04.01.07.04CONCRETO PC=210 KG/CM2 (SIN MEZCLADORA) M3 0.68 371.95 252.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04ACERO FY=4200 KG/M2 KG 85.75 4.71 403.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04ENCOFRADO Y DESENCOFRADO TAPA M2 13.23 26.86 355.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.05FILTROS
01.04.03.04.01.07.05MURO CILINDRICO CON LADRILLO CORRIENTE CABEZA Y MORTE M2 34.56 103.18 3,565.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.05GRAVA FILTRANTE CON PIEDRA CHANCADA DE 1/2 M3 5.54 112.88 625.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.05GRAVA FILTRANTE CON PIEDRA SELECCIONADA DEL RIO 2" M3 1.08 49.88 53.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.06INSTALACIONES SANITARIAS
01.04.03.04.01.07.06SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTRO (PERCOL UND 9.00 83.57 752.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.05 PRUEBAS, ENSAYOS Y COTROL DE CALIDAD Err:509
01.04.03.05.01 PRUEBA A LA CALIDAD DEL CONCRETO (PRUEBA A LA COMPREN UNID 24.00 79.04 1,896.96 9.00 711.36 37.50% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.05.02 DISEÑOS DE MEZCLAS PARA COMCRETO UNID 1.00 1200.00 1,200.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02 PROGRAMA DE EDUCACION SANITARIAY CAPACITACION
.02.01 ELABORACION E IMPLEMENTACION DE EDUCACION SANITARIA GLB 1.00 2200.00 2,200.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.02.02 EDUCACION SANITARIA A BENEFICIARIOS TALL 2.00 2100.00 4,200.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.02.03 CAPACITACION A BENEFICIARIOS PARA OPERACIÓN Y MANTENIMTALL 1.00 1110.00 1,110.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.02.04 CONSTITUCION DE JASS-COMITÉ DE MANTENIMIENTO GLB 2.00 1100.00 2,200.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03 MITIGACION AMBIENTAL
03.01 PROGRAMA DE DE SUPERVISION Y VIGILANCIA AMBIENTAL
03.01.01 SUPERVICION Y VIGILANCIA AMBIENTAL MES 6.00 1750.00 10,500.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.02 PROGRAMA DE SEÑALIZACION AMBIENTAL Err:509
03.02.01 INSTALACION DE SEÑALES IMFORMATIVOS-AMBIENTALES UNID 8.00 154.21 1,233.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.03 PROGRAMA DE MONITOREO AMBIENTAL
03.03.01 MONITOREO DE LA CALIDAD DE AGUA PTO 4.00 340.00 1,360.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.03.02 MONITOREO DE LA CALIDAD DEL AIRE PTO 6.00 380.00 2,280.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.03.03 MONITOREO DEL NIVEL DE RUIDO PTO 6.00 120.00 720.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.04 PROGRAMA DE ABANDONO DE OBRA Err:509
03.04.01 LIMPIEZA FINAL DE LA OBRA M2 ### 0.05 905.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.04.01 MANEJO DE DESECHOS Y EXCAVACIONES DE TRINCHERAS M3 21.80 86.57 1,887.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.05 PLAN DE CONTINGENCIAS Err:509
03.05.01 PLAN DE CONTINGENCIAS E IMPREVISTOS AMBIENTALES GLB 1.00 5600.00 5,600.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.06 PROGRAMA DE EDUCACION AMBIENTAL
03.06.01 EDUCACION AMBIENTAL A BENEFICIARIOS TALL 2.00 3450.00 6,900.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
COSTO DIRECTO ### S/.259,869.83 11.12% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL VALORIZADO ### S/.259,869.83 11.12% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0.06582927652018 Gastos generales S/.153,799.25 S/.17,107.04 11.12% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0.01498072765769 Expediente Técnico S/.35,000.00 S/.35,000.00 ### S/.0.00 0.00% ### ### S/.0.00 0.00%
0.03693503968273 Supervisión de Obra S/.86,292.63 S/.9,598.30 11.12% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0.01084897876658 Liquidación de Obra S/.25,346.85 S/.0.00 0.00% S/.0.00 0.00% S/.0.00 0.00% S/.25,346.85 100.00%
TOTAL 2,636,773.84 321,575.17 12.20% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
REPROGRAMACIÓN DE OBRA
MES 01 MES 02 MES 03 MES 04 MES 05
Sem. 02 Sem. 03 Sem. 04 Sem. 01 Sem. 02 Sem. 03 Sem. 04 Sem. 01 Sem. 02 Sem. 03 Sem. 04 Sem. 01 Sem. 02 Sem. 03 Sem. 04 Sem. 01 Sem. 02 Sem. 03 Sem. 04

S/. 195.18 S/. 195.18 S/. 390.37


. . .
S/. 5635.88 S/. 5635.88 S/. 11271.75
. . .
S/. 555.19 S/. 555.19 S/. 1110.38
. . .

S/. 450.00 S/. 450.00 S/. 900.00


. . .
S/. 1680.00 S/. 1680.00 S/. 3360.00
. . .
S/. 196.99 S/. 196.99 S/. 393.98
. . .
S/. 180.00 S/. 180.00 S/. 360.00
. . .
S/. 486.00 S/. 486.00 S/. 972.00
. . .
MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO FORMATO - 13
GERENCIA DE INFRAESTRUCTURA

5.2.- VALORIZACION MAYORES METRADOS

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DEL MES DE OCTUBRE- 2019 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %

0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%

COSTO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 ###
0.00%

TOTAL VALORIZADO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

6990
#REF!
GOBIERNO REGIONAL CUSCO
GERENCIA REGIONAL DE INFRAESTRUCTURA
AVANCE MENSUAL
Sub Gerencia de Obras

OBRA : MEJORAMIENTO DE VIAS URBANAS RESIDENTE : INGº JUAN PEREZ


SUPERVISOR : INGº JHON SMIT
INFORME TECNICO MENSUAL ENERO 2011 FECHA : 05 - FEB -2,011

PRESUPUESTO BASE AVANCE MENSUAL AVANCE

ITEMS DESCRIPCION PARTIDA ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ACUMUL

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
GOBIERNO REGIONAL CUSCO
GERENCIA REGIONAL DE INFRAESTRUCTURA
AVANCE MENSUAL
Sub Gerencia de Obras

OBRA : MEJORAMIENTO DE VIAS URBANAS RESIDENTE : INGº JUAN PEREZ


SUPERVISOR : INGº JHON SMIT
INFORME TECNICO MENSUAL ENERO 2011 FECHA : 05 - FEB -2,011

PRESUPUESTO BASE AVANCE MENSUAL AVANCE

ITEMS DESCRIPCION PARTIDA ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ACUMUL

#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
PARTIDAS EJECUTADAS #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #REF!
METRADOS DIARIOS DE PARTIDAS NUEVAS

OBRA : “CREACIÓN DEL SISTEMA DE RIEGO POR ASPERSIÓN EN LA COMUNIDAD CAMPESINA DE HUAYNAPATA ALTA DEL DISTRITO DE
PAUCARTAMBO - PROVINCIA DE PAUCARTAMBO - DEPARTAMENTO DE CUSCO”.

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023


:NOVIEMBRE 2019
ITEMS PRESUPUESTO BASE PROGRAMADO Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa
DESCRIPCION DE PARTIDA UND CANT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
01 ENROCADO EN FALZA ZAPATA
01.01 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA M3 28.00 13.5 14.5
01.02 C°S°E: F'C=100 KG/CM2 + 60% PIEDRA - GRANDE M3 28.00 10 11.7 6.3
S DIARIOS DE PARTIDAS NUEVAS

TOTAL
MES
CANT.
0.00
28.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MUNICIPALIDAD
PROVINCIAL DE FORMATO - 13
PAUCARTAMBO
GERENCIA DE INFRAESTRUCTURA
5.2.- VALORIZACION PARTIDAS NUEVAS

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO
– DEPARTAMENTO DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DEL - 2019 FECHA MES DE FEBRERO


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %

M3 0.00 0.00 #DIV/0! 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
M3 0.00 0.00 #DIV/0! 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

COSTO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

TOTAL VALORIZADO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
Página 103

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

5.3.- METRADOS DIARIOS EXPEDIENTE DE OBRA


OBRA : RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023

AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
01 ADECUADA INFRAESTRUCTURA PEATONAL
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA 3.60x2.40 m und 1.00 - - 1.00
01.01.02 ALMACEN DE OBRA,OFICINA,GUARDIANIA m2 100.00 - - 100.00
01.01.03 ALQUILER DE AMBIENTES PARA OFICINAS mes 8.00 - - 8.00
01.02 TRABAJOS PRELIMINARES - - -
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 - - 1.00
01.02.02 TRANSPORTE DE MATERIALES CUSCO-OBRA glb 1.00 - - 1.00
01.02.03 TRAZO, NIVELES Y REPLANTEO m2 5,916.98 - - 5,916.98
01.02.04 DEMOLICION DE ESTRUCTURAS DE CONCRETO m2 83.74 - - 83.74
ELIMINACION DE MATERIAL EXCEDENTE CON
01.02.05 m3 16.75 - - 16.75
MAQUINARIA D=10 km
01.02.06 LIMPIEZA GENERAL m2 5,916.98 - - 5,916.98
01.02.07 SEÑALIZACION DE SEGURIDAD glb 20.00 - - 20.00
01.03 CONSTRUCCION DE ESCALINATAS - - -
01.03.01 TRAZO, NIVELES Y REPLANTEO m2 2,031.34 - - 2,031.34
01.03.02 CORTE DE MATERIAL SUELTO CON EQUIPO m3 1,909.16 - - 1,909.16

01.03.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 1,261.67 - - 1,261.67

01.03.04 PERFILADO, RIEGO Y COMPACTADO m2 1,927.36 - - 1,927.36


01.03.05 EMPEDRADO DE ESCALINATAS DE E=6" m2 1,927.36 - - 1,927.36
01.03.06 ENCOFRADO Y DESENCOFRADO DE ESCALINATAS m2 1,101.50 - - 1,101.50
01.03.07 CONCRETO f'c=175 kg/cm2, PARA ESCALINATAS m3 225.95 - - 225.95
01.03.08 CURADO DE CONCRETO m2 2,630.11 - - 2,630.11
01.03.09 ACARREO MANUAL D = 25 m m3 841.73 33.93 63.96 41.34 22.23 17.55 15.60 14.04 21.45 25.35 14.04 10.53 28.08 42.12 25.35 35.88 17.16 8.58 7.02 444.21 444.21 397.52
ELIMINACION DE MATERIAL EXCEDENTE CON
01.03.10 m3 841.73 30.00 30.00 30.00 811.73
MAQUINARIA D=10 km
BARANDAS METALICAS CON TUBO DE FIERRO
01.03.11 m 1,633.18 - - 1,633.18
GALVANIZADO DE 2 1/2"
01.03.12 PINTADO DE BARANDAS METALICAS m 1,633.18 - - 1,633.18
01.04 SARDINELES - - -
01.04.01 TRAZO, NIVELES Y REPLANTEO m2 204.13 - - 204.13
01.04.02 EXCAVACION MANUAL m3 4.19 - - 4.19
01.04.03 ACARREO MANUAL D = 25 m m3 4.19 - - 4.19
ENCOFRADO Y DESENCOFRADO DE SARDINELES DE
01.04.04 m2 492.06 - - 492.06
CONCRETO
01.04.05 CONCRETO f'c=175 kg/cm2, PARA SARDINELES m3 28.79 - - 28.79
01.04.06 CURADO DE CONCRETO EN SARDINELES m 2,041.30 - - 2,041.30
01.04.07 SELLADO DE JUNTAS EN SARDINELES m 155.20 - - 155.20
01.05 VEREDAS - - -
01.05.01 TRAZO, NIVELES Y REPLANTEO m2 630.97 - - 630.97
01.05.02 EXCAVACION MANUAL m3 63.10 - - 63.10
01.05.03 NIVELACION Y COMPACTADO MANUAL m2 630.97 - - 630.97
01.05.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 47.58 - - 47.58
01.05.05 EMPEDRADO DE e= 6" cm m2 630.97 - - 630.97
01.05.06 CONCRETO f'c=175 kg/cm2, PARA VEREDAS m3 63.10 - - 63.10
01.05.07 SELLADO DE JUNTAS PARA VEREDAS m 33.66 - - 33.66
01.05.08 CURADO DE CONCRETO EN VEREDAS m 630.97 - - 630.97
01.06 CUNETA DE CONCRETO - - -
01.06.01 TRAZO, NIVELES Y REPLANTEO m2 648.84 - - 648.84
01.06.02 EXCAVACION MANUAL m3 194.65 - - 194.65
01.06.03 NIVELACION Y COMPACTADO MANUAL m2 648.84 - - 648.84
Página 104

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

5.3.- METRADOS DIARIOS EXPEDIENTE DE OBRA


OBRA : RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023

AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
01.06.04 SOLADO e=2" MEZCLA 1;12 m2 648.84 - - 648.84
ENCOFRADO Y DESENCOFRADO DE CUNETA (Hmax =
01.06.05 m2 1,108.88 - - 1,108.88
30 cm.)
01.06.06 CONCRETO f'c=175 kg/cm2, PARA SARDINELES m3 129.77 - - 129.77
01.06.07 TARRAJEO CON IMPERMEABILIZANTE m2 973.26 - - 973.26
01.06.08 CURADO DE CONCRETO EN VEREDAS m 1,622.10 - - 1,622.10
01.06.09 SELLADO DE JUNTAS PARA VEREDAS m 744.80 - - 744.80
01.07 PAVIMENTOS - - -
01.07.01 SUB BASE e = 0.20 m - - -
01.07.01.0 TRAZO, NIVELES Y REPLANTEO m2 770.75 - - 770.75
01.07.01.0 MATERIAL GRANULAR PARA SUB BASE m3 154.15 - - 154.15
EXTENDIDO Y COMPACTADO DE MATERIAL DE LA
01.07.01.0 m2 770.75 - - 770.75
SUB BASE
01.07.01.0 RIEGO m2 770.75 - - 770.75
01.07.02 BASE e = 0.30 m - - -
01.07.02.0 TRAZO, NIVELES Y REPLANTEO m2 770.75 - - 770.75
01.07.02.0 MATERIAL GRANULAR PARA BASE m3 231.23 - - 231.23
EXTENDIDO Y COMPACTADO DE MATERIAL DE LA
01.07.02.0 m2 770.75 - - 770.75
BASE
01.07.02.0 RIEGO m2 770.75 - - 770.75
01.07.03 LOSA DE RODADURA - - -
01.07.03.0 TRAZO, NIVELES Y REPLANTEO m2 770.75 - - 770.75
ENCOFRADO Y DESENCOFRADO LOSA DE
01.07.03.0 m2 437.40 - - 437.40
CONCRETO
01.07.03.0 CONCRETO F'c = 210 KG/CM2 (PREMEZCLADO) m3 154.15 - - 154.15
01.07.03.0 FIBRA DE ACERO (REFUERZO CONCRETO) m3 154.15 - - 154.15
ACERO CORRUGADO 3/4" Fy = 4200 kg/cm2 Gª 60
01.07.03.0 kg 883.01
(JUNTA TRANSVERSAL) - - 883.01
SELLADO DE JUNTAS DE DILATACION e = 3/4", h =
01.07.03.0 m 215.50 - - 215.50
0.05 m
01.07.03.0 CURADO DE LOSA DE CONCRETO m2 770.75 - - 770.75
01.08 MUROS DE CONCRETO CICLOPEO - - -
01.08.01 LIMPIEZA DE OBRA m2 702.92 - - 702.92
01.08.02 TRAZO, NIVELES Y REPLANTEO m2 702.92 - - 702.92
01.08.03 EXCAVACION MANUAL DE TERRENO m3 1,404.73 - - 1,404.73
01.08.04 NIVELACION Y COMPACTADO MANUAL m2 702.92 - - 702.92
01.08.05 SOLADO DE 2" MEZCLA 1:12 m2 702.92 - - 702.92
ENCOFRADO Y DESENCOFRADO DE MUROS DE
01.08.06 m2 2,387.73 - - 2,387.73
SOSTENIMIENTO
01.08.07 CONCRETO F'C= 175 KG/CM +30% DE P.M m3 458.25 - - 458.25
01.08.08 DRENES DE PVC Ø=3" m 393.20 - - 393.20
01.08.09 JUNTA DE DILATACION PARA MUROS 1"x0.05 m 1:4 m 159.50 - - 159.50
01.08.10 CURADO DE CONCRETO m2 2,387.73 - - 2,387.73
RELLENO Y COMPACTADO EN ZANJA CON MATERIAL
01.08.11 m3 755.19 - - 755.19
PROPIO
01.08.12 ACARREO MANUAL D = 25 m m3 844.42 - - 844.42
ELIMINACION DE MATERIAL EXCEDENTE CON
01.08.13 m3 844.42 - - 844.42
MAQUINARIA D=10 km
01.09 SEÑALETICA - - -
01.09.01 SEÑALIZACION HORIZONTAL - - -
01.09.01.0 PINTADO DE SARDINELES m2 438.40 - - 438.40
SEÑALIZACION HORIZONTAL EN CRUCERO
01.09.01.0 m2 21.00 - - 21.00
PEATONAL
01.09.02 SEÑALIZACION VERTICAL - - -
Página 105

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

5.3.- METRADOS DIARIOS EXPEDIENTE DE OBRA


OBRA : RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023

AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
01.09.02.0 SEÑALIZACION INFORMATIVA DE CALLES und 32.00 - - 32.00

01.09.02.0 SEÑALIZACION PREVENTIVA DE CRUCE PEATONAL und 8.00 - - 8.00

01.10 VARIOS, LIMPIEZA Y JARDINERIA - - -


01.10.01 SEMBRIO DE GRASS m2 2,043.45 - - 2,043.45
01.10.02 SUM Y COL PLANTAS ORNAMENTALES und 230.00 - - 230.00

02 REPOSICION DE INSTALACIONES DE AGUA Y DESAGUE - - -

REPOSICION DE INSTALACIONES DE CONEXIONES


02.01 - - -
DOMICILIARIAS DEAGUA
02.01.01 TRAZO, NIVELES Y REPLANTEO m2 240.96 - - 240.96
02.01.02 EXCAVACION DE ZANJAS MANUAL m3 240.96 - - 240.96
02.01.03 PERFILADO Y COMPACTADO m2 240.96 - - 240.96
02.01.04 CAMA DE ARENA PARA APOYO DE TUBERIA m 240.96 - - 240.96
RELLENO Y COMPACTADO EN ZANJA CON MATERIAL
02.01.05 m3 216.86 - - 216.86
PROPIO
02.01.06 RECONEXION DOMICILIARIAS DE AGUA und 141.00 - - 141.00
02.01.07 ACARREO MANUAL D = 25 m m3 31.32 - - 31.32
REPOSICION DE INSTALACIONES DE CONEXIONES
02.02 - - -
DOMICILIARIAS DE DESAGUE
02.02.01 TRAZO, NIVELES Y REPLANTEO m2 240.96 - - 240.96
02.02.02 EXCAVACION DE ZANJAS MANUAL m3 240.96 - - 240.96
02.02.03 PERFILADO Y COMPACTADO m2 240.96 - - 240.96
02.02.04 CAMA DE ARENA PARA APOYO DE TUBERIA m 240.96 - - 240.96
RELLENO Y COMPACTADO EN ZANJA CON MATERIAL
02.02.05 m3 216.86 - - 216.86
PROPIO
02.02.06 RECONEXION DOMICILIARIAS DE DESAGUE und 144.00 - - 144.00
02.02.07 ACARREO MANUAL D = 25 m m3 31.32 - - 31.32
02.03 ENCIMADO DE BUZON - - -
02.03.01 ENCIMADO DE BUZON und 51.20 - - 51.20
02.03.02 TAPA METALICA PARA BUZON und 61.44 - - 61.44

02.04 SISTEMA DE EVACUACION DE AGUAS PLUVIALES - - -

02.04.01 SUMIDEROS - - -
02.04.01.0 TRAZO, NIVELES Y REPLANTEO m2 44.70 - - 44.70
02.04.01.0 EXCAVACION MANUAL m3 24.59 - - 24.59
02.04.01.0 NIVELACION Y COMPACTADO MANUAL m2 44.70 - - 44.70
02.04.01.0 ACARREO MANUAL D = 25 m m3 31.96 - - 31.96
ELIMINACION DE MATERIAL EXCEDENTE CON
02.04.01.0 m3 31.96 - - 31.96
MAQUINARIA D=10 km

02.04.01.0 SOLADOS PARA SUMIDEROS F'c = 100 KG/CM2 e = 2" m2 44.70 - - 44.70

02.04.01.0 ACERO CORRUGADO Fy = 4200 kg/cm2 Gª 60 kg 981.30 - - 981.30


02.04.01.0 ENCOFRADO Y DESENCOFRADO m2 59.36 - - 59.36
02.04.01.0 CONCRETO f'c=175 kg/cm2 m3 20.04 - - 20.04
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:5 e
02.04.01.1 m2 79.82 - - 79.82
= 1.5 cm
02.04.01.1 REJILLA PARA SUMIDERO und 21.00 - - 21.00
02.04.01.1 CURADO DE CONCRETO m2 79.82 - - 79.82
02.04.02 TUBERIA PARA DRENAJE PLUVIAL - - -
02.04.02.0 TRAZO Y REPLANTEO m 50.40 - - 50.40
02.04.02.0 EXCAVACION MANUAL m3 35.28 - - 35.28
Página 106

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

5.3.- METRADOS DIARIOS EXPEDIENTE DE OBRA


OBRA : RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023

AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
02.04.02.0 NIVELACION Y COMPACTADO MANUAL m2 50.40 - - 50.40
02.04.02.0 CAMA DE ARENA PARA APOYO DE TUBERIA m 50.40 - - 50.40
SUMINISTRO Y COLOCACION DE TUBERIA PVC U
02.04.02.0 m 63.00 - - 63.00
200 mm SN-4 C/ANILLO NTP ISO 4435
RELLENO Y COMPACTADO EN ZANJA CON
02.04.02.0 m3 30.24 - - 30.24
MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON
02.04.02.0 m3 6.55 - - 6.55
MAQUINARIA D=10 km
02.05 REHUBICACION DE POSTES - - -
02.05.01 REUBICACION DE POSTES glb 5.00 - - 5.00
03 MITIGACION DE IMPACTOS CULTURALES - - -
03.01 PLAN DE MONITOREO ARQUEOLOGICO - - -
03.01.01 APROBACION DE EXPEDIENTE DE PMA - - -
APROBACION DEL PLAN DE MONITOREO
03.01.01.0 Exp 1.00 1.00 1.00 1.00 -
ARQUEOLOGICO
03.01.02 SEGURIDAD Y SALUD - - -
03.01.02.0 SEÑALIZACION TEMPORAL EN EL TRABAJO m 1,677.00 - - 1,677.00
03.01.03 CONTROL Y MONITOREO ARQUEOLOGICO - - -
03.01.03.0 CHARLA DE INDUCCIÓN Cha 3.00 - - 3.00
03.01.03.0 MONITOREO DE ZANJAS m3 3,603.00 33.93 63.96 41.34 22.23 17.55 15.60 14.04 21.45 25.35 14.04 10.53 28.08 42.12 25.35 35.88 17.16 8.58 7.02 444.21 444.21 3,158.79
03.01.03.0 RECUPERACIÓN DEL MATERIAL ARQUEOLÓGICO bol 5.00 - - 5.00
03.01.04 REGISTRO ARQUEOLOGICO - - -
03.01.04.0 REGISTRO FOTOGRAFICO und 200.00 - - 200.00
REGISTRO GRAFICO ARQUEOLOGICO (PLANTAS,
03.01.04.0 Lam 150.00 - - 150.00
PERFILES)
03.01.04.0 REGISTRO ESCRITO Ficha 50.00 - - 50.00
03.01.05 ANALISIS DE MATERIAL CULTURAL - - -
03.01.05.0 LAVADO DE MATERIAL CULTURAL bls 5.00 - - 5.00

03.01.05.0 MARCADO Y CODIFICADO DE MATERIAL CULTURAL bls 5.00 - - 5.00

03.01.05.0 TIPOLOGIA Y SERIACIÓN DE MATERIAL CULTURAL bls 5.00 - - 5.00

03.01.05.0 REGISTRO GRAFICO DE MATERIAL CULTURAL Lam 5.00 - - 5.00


03.01.05.0 EMBALAJE DE MATERIAL CULTURAL cja 1.00 - - 1.00
REGISTRO FOTOGRAFICO DE MATERIAL CULTURAL
03.01.05.0 und 40.00 - - 40.00
EN GABINETE
03.01.06 PLAN DE CONTINGENCIA - - -
03.01.06.0 PLAN DE CONTINGENCIA glb 1.00 1.00 1.00 1.00 -
03.01.07 INFORME FINAL DEL PMA - - -
PRESENTACION DE INFORME FINAL DEL PLAN DE
03.01.07.0 Exp 1.00 - - 1.00
MONITOREO ARQUEOLOGICO ANTE LA DDC
04 COVID - 19 - - -
ELABORACION DEL PLAN DE VIGILANCIA, PREVENCION
04.01 und 1.00 - - 1.00
Y CONTROL DEL COVID - 19
CAPACITACION DE SALUD Y SEGURIDAD PARA COVID -
04.02 und 1.00 - - 1.00
19
IMPLEMENTOS DE PROTECCION PERSONAL PARA
04.03 glb 1.00 - - 1.00
COVID - 19
04.04 PRUEBAS RAPIDAS PARA DESCARTE DE COVID - 19 und 90.00 - - 90.00
04.05 EQUIPOS DE DESINFECCION glb 1.00 - - 1.00
04.06 CONSTRUCCION DE ZONAS DE DESINFECCION m2 1.00 - - 1.00
04.07 CONSTRUCCION DE VESTIDORES m2 1.00 - - 1.00
04.08 CONSTRUCCION DE COMEDOR m2 1.00 - - 1.00
04.09 SEÑALIZACION PREVENTIVA DE COVID - 19 und 1.00 - - 1.00
05 SEGURIDAD Y SALUD - - -
Página 107

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

5.3.- METRADOS DIARIOS EXPEDIENTE DE OBRA


OBRA : RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023

AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
05.01 EQUIPOS DE PROTECCION INDIVIDUAL jgo 10.00 - - 10.00

ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN


05.02 glb 1.00 - - 1.00
DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
p
05.03 CAPACITACION EN SEGURIDAD Y SALUD und 8.00 - - 8.00
RESPUESTAS ANTE EMERGENCIA EN SEGURIDAD Y
05.04 jgo 1.00 - - 1.00
SALUD
05.05 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 - - 1.00
05.06 SEÑALES PARA DESVIO DE TRANSITO glb 1.00 - - 1.00
05.07 SEÑALIZACION DE SEGURIDAD glb 1.00 - - 1.00
06 MITIGACION DE IMPACTO AMBIENTAL - - -
06.01 RIEGO DURANTE EL PROCESO CONSTRUCTIVO m2 5,916.98 - - 5,916.98
ACONDICIONAMIENTO DE DEPOSITO DE MATERIAL
06.02 m3 50.00 - - 50.00
EXCEDENTE
06.03 LIMPIEZA FINAL DE OBRA m2 5,916.98 - - 5,916.98
07 TRABAJOS COMPLEMENTARIOS - - -
07.01 CONTROL DE CALIDAD EN OBRA - - -
07.01.01 PRUEBAS DE COMPACTACION EN CAMPO und 16.00 - - 16.00

07.01.02 PRUEBAS DE COMPRESION SIMPLE DEL CONCRETO und 12.00 - - 12.00

07.01.03 DISEÑO DE MEZCLAS DE CONCRETO PRU 2.00 - - 2.00


07.02 PLACA RECORDATORIA - - -
INSTALACION Y SUMINISTRO DE PLACA
07.02.01 und 1.00 - - 1.00
RECORDATORIA
Página 108

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS


Wednesday, February 8, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
01.03 CONSTRUCCION DE ESCALINATAS
01.03.09 ACARREO MANUAL D = 25 m
Progresiva 0+560 al 0+600km 8.00 8.00

1.1.12 VEREDAS Y GRADAS

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 36.00 M2


Progresiva 0+530 al 0+560km(Lado Izquierdo) 1.00 30.00 1.20 36.00

1.1.12.5 BASE DE PIEDRA E=6" 3.15 M3


Progresiva 0+870 al 0+885(Lado derecho) 1.00 15.00 1.40 0.15 3.15

1.1.12.6 ENCOFRADO Y DESENCOFRADO 11.20 M2


Progresiva 0+870 al 0+885(Lado derecho) 1.00 14.00 0.80 11.20

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 9.39 M3


Progresiva 0+560 al 0+600km( vereda)(Lado Izquierdo) 1.00 40.00 0.90 0.10 3.6
Progresiva 0+560 al 0+600km( Sardinel)(Lado Izquierdo) 1.00 40.00 0.15 0.60 3.6
Progresiva 0+870 al 0+885km( vereda)(Lado derecho) 1.00 15.00 1.40 0.10 2.1
Progresiva 0+870 al 0+885km( sardinel)(Lado derecho) 1.00 1.00 0.15 0.60 0.09

1.1.12.10 BRUÑAS EN VEREDAS 82.50 M


Progresiva 0+560 al 0+600km( vereda)(Lado Izquierdo) 1.00 60.00 60.00
Progresiva 0+870 al 0+885km(Lado derecho) 1.00 22.50 22.50
Thursday, February 9, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS

1.1.12.1 PICADO DE VEREDAS 16.12 M2


Progresiva 0+290(Lado izquierdo) 1.00 5.20 3.10 16.12

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 105.00 M2


Progresiva 0+835 al 0+870km(Lado derecho) 1.00 35.00 1.40 49.00
Progresiva 0+500 al 0+530km(Lado derecho) 1.00 40.00 1.40 56.00

1.1.12.5 BASE DE PIEDRA E=6" 4.73 M3


Progresiva 0+530 al 0+560km(Lado Izquierdo) 1.00 30.00 1.05 0.15 4.73

1.1.12.6 ENCOFRADO Y DESENCOFRADO 18.00 M2


Progresiva 0+530 al 0+560(Lado Izquierdo) 1.00 30.00 0.60 18.00

1.1.12.11 CURADO DE CONCRETO 88.00 M2


Progresiva 0+560 al 0+600km( vereda)(Lado Izquierdo) 1.00 40.00 0.90 36.00
Progresiva 0+560 al 0+600km( Sardinel)(Lado Izquierdo) 1.00 40.00 0.60 24.00
Progresiva 0+870 al 0+885km( vereda)(Lado derecho) 1.00 14.00 1.40 19.60
Progresiva 0+870 al 0+885km( sardinel)(Lado derecho) 1.00 14.00 0.60 8.40

Friday, February 10, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.3.2 CAJAS DE REGISTRO


1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 5.00 UND
5.00 5.00
1.1.12 VEREDAS Y GRADAS
1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 91.00 M2
Progresiva 0+810 al 0+835km(Lado derecho) 1.00 25.00 1.40 35.00
Progresiva 0+575 al 0+590km(Lado derecho) 1.00 40.00 1.40 56.00

1.1.12.5 BASE DE PIEDRA E=6" 3.15 M3


Progresiva 0+855 al 0+870km(Lado Izquierdo) 1.00 15.00 1.40 0.15 3.15

1.1.12.6 ENCOFRADO Y DESENCOFRADO 12.00 M2


Progresiva 0+855 al 0+870km(Lado Izquierdo) 1.00 15.00 0.80 12.00

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 10.20 M3


Progresiva 0+530 al 0+560km( vereda)(Lado Izquierdo) 1.00 30.00 1.20 0.10 3.60
Progresiva 0+530 al 0+560km(Sardinel)(Lado Izquierdo) 1.00 30.00 0.15 0.60 2.70
Progresiva 0+855 al 0+870km(vereda)(Lado derecho) 1.00 15.00 1.40 0.10 2.10
Página 109

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS


Progresiva 0+855 al 0+870km(sardinel)(Lado derecho) 1.00 15.00 0.15 0.80 1.80

1.1.12.10 BRUÑAS EN VEREDAS 67.50 M


Progresiva 0+530 al 0+560km( vereda)(Lado Izquierdo) 1.00 67.50 67.50

Saturday, February 11, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 1.00 UND
Progresiva 0+575 al 0+590km( vereda)(Lado derecho) 1.00 1.00

1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 1.00 PZA
Progresiva 0+390 1.00 1.00
1.1.5.3.1.2 TUBERIA PVC SAL DE Ø 6" 6.00 M
Progresiva 0+287.50 (interseccion) 1.00 6.00 6.00

1.1.12 VEREDAS Y GRADAS


1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 150.00 M
Progresiva 0+800 al 0+950km(Lado derecho) 1.00 150.00 150.00

1.1.12.5 BASE DE PIEDRA E=6" 3.15 M3


Progresiva 0+575 al 0+0+590km(Lado derecho) 1.00 20.00 1.05 0.15 3.15

1.1.12.6 ENCOFRADO Y DESENCOFRADO 12.00 M2


Progresiva 0+575 al 0+0+590km(Lado derecho) 1.00 15.00 0.80 12.00

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 3.45 M3


Progresiva 0+575 al 0+590km( vereda)(Lado derecho) 1.00 15.00 1.10 0.10 1.65
Progresiva 0+575 al 0+590km( Sardinel Muro)(Lado derecho) 1.00 15.00 0.15 0.80 1.8

1.1.12.10 BRUÑAS EN VEREDAS 22.50 M


Progresiva 0+575 al 0+590km( vereda)(Lado derecho) 22.50 22.50

Sunday, February 12, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS

1.1.12.5 BASE DE PIEDRA E=6" 7.02 M3


Progresiva 0+846 al 0+855km(Lado derecho) 1.00 9.00 1.20 0.15 1.62
Progresiva 0+500 al 0+530km(Lado Izquierdo) 1.00 30.00 1.20 0.15 5.40
1.1.12.6 ENCOFRADO Y DESENCOFRADO 5.40 M2
Progresiva 0+846 al 0+855km( Sardinel)(Lado derecho) 1.00 9.00 0.60 5.40

1.1.12.11 CURADO DE CONCRETO 28.50 M2


Progresiva 0+575 al 0+590km( vereda)(Lado derecho) 1.00 15.00 1.10 16.50
Progresiva 0+575 al 0+590km( Sardinel Muro)(Lado derecho) 1.00 15.00 0.80 12.00

Tuesday, February 14, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD VOLUMEN SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.3.2 CAJAS DE REGISTRO


1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 1.00 UND
Progresiva 0+575 al 0+590km( vereda)(Lado derecho) 1.00 1.00

1.1.12 VEREDAS Y GRADAS


1.1.12.6 ENCOFRADO Y DESENCOFRADO 18.00 M2
Progresiva 0+500al 0+530km(Lado Izquierdo) 1.00 30.00 0.60 18.00

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 1.89 M3


Progresiva 0+846 al 0+855km( vereda)(Lado derecho) 1.00 9.00 1.20 0.10 1.08
Progresiva 0+846 al 0+855km( Sardinel )(Lado derecho) 1.00 9.00 0.15 0.60 0.81

1.1.6.2 SUB-RASANTE
1.1.6.2.2 CORTE DE TERRENO A NIVEL DE SUB RASANTE 150.00 M3
Progresiva 0+400AL 0+500 1.00 100.00 6.00 0.25 150.00

1.1.6.2.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 216.00 M3


Progresiva 0+465 AL 0+520 (Acumulado) 1.00 55.00 6.00 0.2 66.00
Progresiva 0+400AL 0+500 1.00 100.00 6.00 0.25 150.00
Página 110

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS

Wednesday, February 15, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 4.00 UND
Progresiva 0+500 al 0+530km( vereda)(Lado izquierdo) Progresiva 0+825 al
4.00 4.00
0+0+840km(Lado derecho)

1.1.12 VEREDAS Y GRADAS


1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 18.00 M2
Progresiva 0+825 al 0+840km(Lado derecho) 1.00 15.00 1.20 18.00

1.1.12.5 BASE DE PIEDRA E=6" 2.70 M3


Progresiva 0+825 al 0+0+840km(Lado derecho) 1.00 15.00 1.20 0.15 2.70

1.1.12.6 ENCOFRADO Y DESENCOFRADO 9.00 M2


Progresiva 0+825 al 0+0+840km(Lado derecho) 1.00 15.00 0.60 9.00

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 10.02 M3


Progresiva 0+500 al 0+530km( vereda)(Lado Izquierdo) 1.00 31.00 1.20 0.10 3.72
Progresiva 0+500 al 0+530km( Sardinel )(Lado Izquierdo) 1.00 31.00 0.15 0.60 2.79
Progresiva 0+825 al 0+0+840km(Lado derecho) 1.00 15.00 1.20 0.10 1.80
Progresiva 0+825 al 0+0+840km(Lado derecho) 1.00 15.00 0.15 0.60 1.35
Progresiva 0+290 al 0+293km(Lado izquierdo) 1.00 3.00 1.20 0.10 0.36

1.1.12.10 BRUÑAS EN VEREDAS 73.50 M


Progresiva 0+500 al 0+530km( Sardinel )(Lado Izquierdo) 73.50 73.50

1.1.12.11 CURADO DE CONCRETO 16.20 M2


Progresiva 0+846 al 0+855km( vereda)(Lado derecho) 1.00 9.00 1.20 10.8
Progresiva 0+846 al 0+855km( Sardinel )(Lado derecho) 1.00 9.00 0.60 5.40

Thursday, February 16, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 14.40 M2
Progresiva 0+450 al 0+466km(Lado derecho) 1.00 16.00 0.90 14.40

1.1.12.5 BASE DE PIEDRA E=6" 2.16 M3


Progresiva 0+450 al 0+466km(Lado derecho) 1.00 16.00 0.90 0.15 2.16

1.1.12.11 CURADO DE CONCRETO 70.20 M2


Progresiva 0+500 al 0+530km( vereda)(Lado Izquierdo) 1.00 31.00 1.20 37.20
Progresiva 0+500 al 0+530km( Sardinel )(Lado Izquierdo) 1.00 31.00 0.60 18.60
Progresiva 0+825 al 0+0+840km(Lado derecho) 1.00 15.00 1.20 0.10 1.80
Progresiva 0+825 al 0+0+840km(Lado derecho) 1.00 15.00 0.60 9.00
Progresiva 0+290 al 0+293km(Lado izquierdo) 1.00 3.00 1.20 3.60

Friday, February 17, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS

1.1.12.6 ENCOFRADO Y DESENCOFRADO 9.60 M2


Progresiva 0+450 al 0+466km(Lado derecho) 1.00 16.00 0.60 9.60

Saturday, February 18, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.3.2 CAJAS DE REGISTRO


1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 3.00 UND
Progresiva 0+485 al 0+508km( vereda)(Lado derecho) 3.00 3.00

1.1.12 VEREDAS Y GRADAS


1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 2.88 M3
Progresiva 0+450 al 0+466km(Lado derecho) 1.00 16.00 0.90 0.10 1.44
Página 111

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS


Progresiva 0+450 al 0+466km(Lado derecho) 1.00 16.00 0.15 0.60 1.44

1.1.12.10 BRUÑAS EN VEREDAS 24.00 M


Progresiva 0+450 al 0+466km(Lado derecho) 24.00 24.00

04.04 PRUEBAS RAPIDAS PARA DESCARTE DE COVID - 19


04.05 EQUIPOS DE DESINFECCION 1.10 m²
Progresiva 0+845 km (Lado Izquierdo) 1.00 1.05 1.05 1.10

04.07 CONSTRUCCION DE VESTIDORES 1.16 m³


Progresiva 0+845 km (Lado Izquierdo) 1.00 1.05 1.05 1.05 1.16

04.08 CONSTRUCCION DE COMEDOR 1.10 m²


Progresiva 0+845 km (Lado Izquierdo) 1.00 1.05 1.05 1.10

04.09 SEÑALIZACION PREVENTIVA DE COVID - 19 4.50 m²


Progresiva 0+845 km (Lado Izquierdo) 1.00 3.00 1.50 4.50

05 SEGURIDAD Y SALUD 4.50 m²


Progresiva 0+845 km (Lado Izquierdo) 1.00 3.00 1.50 4.50

05.02 ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE


SEGURIDAD Y SALUD EN EL TRABAJO 25.06 Kg
Progresiva 0+845 km (Lado Izquierdo) 1.00 44.75 25.06

05.04 RESPUESTAS ANTE EMERGENCIA EN SEGURIDAD Y SALUD 1.05 m


Progresiva 0+845 km (Lado Izquierdo) 1.00 1.05 1.05

05.05 EQUIPOS DE PROTECCION COLECTIVA 1.65 m3


Progresiva 0+845 km (Lado Izquierdo) 1.00 1.05 1.05 1.50 1.65

Sunday, February 19, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS

1.1.12.11 CURADO DE CONCRETO 24.00 M2


Progresiva 0+450 al 0+466km(Lado derecho) 1.00 16.00 0.90 14.4
Progresiva 0+450 al 0+466km(Lado derecho) 1.00 16.00 0.60 9.6

Tuesday, February 21, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
02.01.04 CAMA DE ARENA PARA APOYO DE TUBERIA 8.10 M2
Progresiva 0+977(Lado Izquierdo) 1.00 5.40 1.50 8.10

1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 42.00 M


Progresiva 0+372 al 0+414km(Lado derecho) 1.00 42.00 42.00

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 16.20 M2


Progresiva 0+446 al 0+464km(Lado derecho) 1.00 18.00 0.90 16.20

1.1.12.5 BASE DE PIEDRA E=6" 2.43 M3


Progresiva 0+446 al 0+464km(Lado derecho) 1.00 18.00 0.90 0.15 2.43

1.1.12.6 ENCOFRADO Y DESENCOFRADO 10.80 M2


Progresiva 0+446 al 0+464km(Lado derecho) 1.00 18.00 0.60 10.80

1.2.4 CAJAS DE DISTRIBUCION Y DE DISIPACION


1.2.4.1 LIMPIEZA DEL TERRENO MANUAL 1.10 m²
Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05 1.10

1.2.4.4 NIVELACION INT. Y APISONADO MANUAL 1.10 m²


Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05 1.10

1.2.4.5 ENCOFRADO Y DESENCOFRADO 9.60 m²


Progresiva 0+950 km (Lado Izquierdo) 1.00 3.00 3.20 9.60

1.2.4.6 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA C:A /1:5 9.60 m²


Progresiva 0+950 km (Lado Izquierdo) 1.00 3.00 3.20 9.60

1.2.4.8 ACERO DE REFUERZO f'y= 4200 Kg/cm2 56.33 Kg


Progresiva 0+950 km (Lado Izquierdo) 1.00 100.59 56.33

1.2.4.10 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 1.05 m


Página 112

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS


Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05

1.2.4.11 EXCAVACION MANUAL DE ZANJAS 3.53 m3


Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05 3.20 3.53

Wednesday, February 22, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3 CONEXIONES DOMICILIARIAS
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 3.00 PZA
Progresiva 0+750 y 0+780 (Lado Izquierdo) 3.00 3.00
1.1.5.3.1.2 TUBERIA PVC SAL DE Ø 6" 12.00 M
Progresiva 0+750 y 0+780 (Lado Izquierdo) 2.00 6.00 12.00

1.1.5.3.2 CAJAS DE REGISTRO


1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 1.00 UND
Progresiva 0+446 al 0+464 km(Lado Izquierdo) 1.00 1.00

1.1.12 VEREDAS Y GRADAS


1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 3.24 M3
Progresiva 0+446 al 0+464km(Lado Derecho) 1.00 18.00 0.90 0.10 1.62
Progresiva 0+446 al 0+464km(Lado Derecho) 1.00 18.00 0.15 0.60 1.62

1.1.12.10 BRUÑAS EN VEREDAS 27.00 M


Progresiva 0+446 al 0+464km(Lado Derecho) 27.00 27.00

Thursday, February 23, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3 CONEXIONES DOMICILIARIAS
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 1.00 PZA
Progresiva 0+750 y 0+780 (Lado derecho) 1.00 1.00

1.1.5.3.2 CAJAS DE REGISTRO


1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 2.00 UND
Progresiva 0+446 al 0+464 km(Lado Izquierdo) 2.00 2.00

1.1.12 VEREDAS Y GRADAS


1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 24.00 M2
Progresiva 0+808 al 0+828km(Lado Derecho) 1.00 20.00 1.20 24.00

1.1.12.5 BASE DE PIEDRA E=6" 3.60 M3


Progresiva 0+808 al 0+828km(Lado Derecho) 1.00 20.00 1.20 0.15 3.60

1.1.12.6 ENCOFRADO Y DESENCOFRADO 12.00 M2


Progresiva 0+808 al 0+828km(Lado Derecho) 1.00 20.00 0.60 12.00

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 4.20 M3


Progresiva 0+808 al 0+828km(Lado Derecho) 1.00 20.00 1.20 0.10 2.40
Progresiva 0+808 al 0+828km(Lado Derecho) 1.00 20.00 0.15 0.60 1.80

1.1.12.10 BRUÑAS EN VEREDAS 30.00 M


Progresiva 0+808 al 0+828km(Lado Derecho) 30.00 30.00

1.1.12.11 CURADO DE CONCRETO 27.00 M2


Progresiva 0+446 al 0+464km(Lado Derecho) 1.00 18.00 0.90 16.20
Progresiva 0+446 al 0+464km(Lado Derecho) 1.00 18.00 0.60 10.80

Friday, February 24, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 1.00 PZA
Progresiva 0+950 al 980 (lado Derecho) 1.00 1.00
1.1.12 VEREDAS Y GRADAS
1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 30.00 M
Progresiva 0+372 al 0+402 1.00 30.00 30.00

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 33.00 M2


Progresiva 0+372 al 0+402 1.00 30.00 1.10 33.00
Página 113

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS


1.1.12.5 BASE DE PIEDRA E=6" 4.95 M3
Progresiva 0+372 al 0+402 1.00 30.00 1.10 0.15 4.95

1.1.12.6 ENCOFRADO Y DESENCOFRADO 18.00 M2


Progresiva 0+372 al 0+402 1.00 30.00 0.60 18.00

Saturday, February 25, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 2.00 UND
Progresiva 0+372 al 0+402(Lado Izquierdo) 2.00 2.00

1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 1.00 PZA
Progresiva 0+950 al 980 (lado Derecho) 1.00 1.00

1.1.12 VEREDAS Y GRADAS


1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 6.72 M3
Progresiva 0+372 al 0+402(Lado Izquierdo) 1.00 32.00 1.20 0.10 3.84
Progresiva 0+372 al 0+402(Lado Izquierdo) 1.00 32.00 0.15 0.60 2.88

1.1.12.10 BRUÑAS EN VEREDAS 48.00 M


Progresiva 0+372 al 0+402(Lado Izquierdo) 48.00 48.00

Sunday, February 26, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS

1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 15.00 M


Progresiva 0+780(Intersecciones) 1.00 5.00 5.00
Progresiva 0+867(Intersecciones) 1.00 6.00 6.00
Progresiva 0+910(Intersecciones) 1.00 4.00 4.00

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 17.10 M2


Progresiva 0+780(Intersecciones) 1.00 5.00 1.10 5.50
Progresiva 0+867(Intersecciones) 1.00 6.00 1.20 7.20
Progresiva 0+910(Intersecciones) 1.00 4.00 1.10 4.40

1.1.12.5 BASE DE PIEDRA E=6" 2.57 M3


Progresiva 0+780(Intersecciones) 1.00 5.00 1.10 0.15 0.83
Progresiva 0+867(Intersecciones) 1.00 6.00 1.20 0.15 1.08
Progresiva 0+910(Intersecciones) 1.00 4.00 1.10 0.15 0.66

1.1.12.6 ENCOFRADO Y DESENCOFRADO 9.00 M2


Progresiva 0+780(Intersecciones) 1.00 5.00 0.60 3.00
Progresiva 0+867(Intersecciones) 1.00 6.00 0.60 3.60
Progresiva 0+910(Intersecciones) 1.00 4.00 0.60 2.40

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 3.06 M3


Progresiva 0+780(Intersecciones)Vereda 1.00 5.00 1.10 0.10 0.55
Progresiva 0+780(Intersecciones)Sardinel 1.00 5.00 0.15 0.60 0.45
Progresiva 0+867(Intersecciones)Vereda 1.00 6.00 1.20 0.10 0.72
Progresiva 0+867(Intersecciones)Sardinel 1.00 6.00 0.15 0.60 0.54
Progresiva 0+910(Intersecciones)Vereda 1.00 4.00 1.10 0.10 0.44
Progresiva 0+910(Intersecciones)Sardinel 1.00 4.00 0.15 0.60 0.36

1.1.12.10 BRUÑAS EN VEREDAS 22.50 M


Progresiva 0+780(Intersecciones)Vereda 1.00 7.50 7.50
Progresiva 0+867(Intersecciones)Vereda 1.00 9.00 9.00
Progresiva 0+910(Intersecciones)Vereda 1.00 6.00 6.00

1.1.12.11 CURADO DE CONCRETO 57.60 M2


Progresiva 0+372 al 0+402(Lado Izquierdo) 1.00 32.00 1.20 38.4
Progresiva 0+372 al 0+402(Lado Izquierdo) 1.00 32.00 0.60 19.2

Tuesday, February 28, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
Página 114

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS


1.1.6.2 SUB-RASANTE
1.1.6.2.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 263.25 M3
Progresiva 0+745 al 0+970 Proveniente de excavaciones de veredas y
sardineles asimismo de las instalaciones de desague buzones etc.. 1.00 225.00 6.00 0.15 263.25

1.1.12 VEREDAS Y GRADAS


1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 30.00 M
Progresiva 0+915 al 0+945 1.00 30.00 30.00

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 31.50 M2


Progresiva 0+915 al 0+945 1.00 30.00 1.05 31.50

1.1.12.5 BASE DE PIEDRA E=6" 4.73 M3


Progresiva 0+915 al 0+945 1.00 30.00 1.05 0.15 4.73

1.1.12.6 ENCOFRADO Y DESENCOFRADO 5.45 M2


Progresiva 0+915 al 0+945 1.00 9.08 0.60 5.45

Wednesday, March 1, 2023

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 3.00 UND
Progresiva 0+340 al 0+370km(Lado Derecho) 3.00 3.00
1.1.12 VEREDAS Y GRADAS
02.01.04 CAMA DE ARENA PARA APOYO DE TUBERIA 19.20 m2
Progresiva 0+972 al 0+980Vereda(Lado Izquierda) 1.00 10.00 1.20 12.00
Progresiva 0+972 al 0+980 graderia(Lado Izquierda) 1.00 3.00 2.40 7.20

1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 30.00 M


Progresiva 0+340 al 0+370(Lado Derecho) 1.00 30.00 30.00

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 31.50 M2


Progresiva 0+340 al 0+370(Lado Derecho) 1.00 30.00 1.05 31.50

1.1.12.5 BASE DE PIEDRA E=6" 4.73 M3


Progresiva 0+340 al 0+370(Lado Derecho) 1.00 30.00 1.05 0.15 4.73

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 5.46 M3


Progresiva 0+915 al 0+945 Vereda(Lado derecho) 1.00 26.00 1.20 0.10 3.12
Progresiva 0+915 al 0+945Sardinel(Lado derecho) 1.00 26.00 0.15 0.60 2.34

1.1.12.10 BRUÑAS EN VEREDAS 39.00 M


Progresiva 0+915 al 0+945 Vereda(Lado derecho) 1.00 39.00 39.00

Thursday, March 2, 2023


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.6.2 SUB-RASANTE
1.1.6.2.2 CORTE DE TERRENO A NIVEL DE SUB RASANTE 263.25 M3
Progresiva 0+745 al 0+970 1.00 225.00 7.80 0.15 263.25
1.1.12 VEREDAS Y GRADAS
1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 18.80 M2
Progresiva 0+290 (Lado Izquierdo) Interseccion 1.00 7.00 1.40 9.80
Progresiva 0+290 (Lado Izquierdo) Interseccion graderia 1.00 4.50 2.00 9.00

1.1.12.5 BASE DE PIEDRA E=6" 1.47 M3


Progresiva 0+290 (Lado Izquierdo) Interseccion 1.00 7.00 1.40 0.15 1.47

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 9.88 M3


Progresiva 0+340 al 0+370(Lado Derecho)Vereda 1.00 30.00 0.60 0.10 1.80
Progresiva 0+340 al 0+370(Lado Derecho)Sardinel 1.00 30.00 0.15 0.60 2.70
Progresiva 0+290 (Lado Izquierdo) Interseccion 1.00 7.00 1.40 0.10 0.98
Progresiva 0+290 (Lado Izquierdo) Interseccion graderia 1.00 4.50 2.00 0.20 1.80
Progresiva 0+975 Lado Izquiero Muro para Graderia 1.00 6.50 0.20 2.00 2.60
1.1.12.10 BRUÑAS EN VEREDAS 55.50 M
Progresiva 0+129 al 0+146km(Lado Derecho) 55.50 55.50

1.1.14.2 REUBICACION DE POSTES DE MADERA DE CONEXION DOMICILIARIA) 9.00 UND


Progresiva 0+000 al 0+810 ambos lados 9.00 9.00

1.2.4 CAJAS DE DISTRIBUCION Y DE DISIPACION


1.2.4.1 LIMPIEZA DEL TERRENO MANUAL 1.10 m²
Página 115

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS


Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05 1.10

1.2.4.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 1.43 m³


Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05 1.30 1.43

1.2.4.4 NIVELACION INT. Y APISONADO MANUAL 1.10 m²


Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05 1.10

1.2.4.5 ENCOFRADO Y DESENCOFRADO 3.90 m²


Progresiva 0+950 km (Lado Izquierdo) 1.00 3.00 1.30 3.90

1.2.4.6 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA C:A /1:5 3.90 m²


Progresiva 0+950 km (Lado Izquierdo) 1.00 3.00 1.30 3.90

1.2.4.10 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 1.05 m


Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05

1.2.4.11 EXCAVACION MANUAL DE ZANJAS 1.43 m3


Progresiva 0+950 km (Lado Izquierdo) 1.00 1.05 1.05 1.30 1.43

Friday, March 3, 2023


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.6.2 SUB-RASANTE
1.1.6.2.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 228.15 M3
Progresiva 0+745 al 0+970 Proveniente de excavaciones de veredas y
1.00 225.00 7.80 0.10 228.15
sardineles asimismo de las instalaciones de desague buzones etc..

1.1.12 VEREDAS Y GRADAS

1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 20.00 M


Progresiva 0+370 AL 0+ 390 (Lado derecho) Curva 1.00 20.00 20.00

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 21.00 M2


Progresiva 0+370 AL 0+ 390 (Lado derecho) Curva 1.00 20.00 1.05 21.00

1.1.12.5 BASE DE PIEDRA E=6" 3.15 M3


Progresiva 0+370 AL 0+ 390 (Lado derecho) Curva 1.00 20.00 1.05 0.15 3.15

Saturday, March 4, 2023


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 3.00 UND
Progresiva 0+430, 0+630km(Lado Derecho) 3.00 3.00
1.1.6.2 SUB-RASANTE
1.1.6.2.2 CORTE DE TERRENO A NIVEL DE SUB RASANTE 70.20 M3
Progresiva 0+745 al 0+980 1.00 225.00 7.80 0.04 70.20
1.1.6.2.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 205.34 M3
Progresiva 0+745 al 0+980 1.00 225.00 7.80 0.04 91.26
Proveniente del corte anterior 114.08

1.1.12 VEREDAS Y GRADAS


1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 7.35 M2
Progresiva 0+430(Lado Izquierdo) 1.00 3.00 1.05 3.15
Progresiva 0+630(Lado Izquierdo) 1.00 2.00 0.50 1.00
Progresiva 0+515(Lado Izquierdo) 1.00 1.00 1.20 1.20
Progresiva 0+655(Lado Izquierdo) 1.00 4.00 0.50 2.00

1.1.12.5 BASE DE PIEDRA E=6" 1.10 M3


Progresiva 0+430(Lado Izquierdo) 1.00 3.00 1.05 0.15 0.47
Progresiva 0+630(Lado Izquierdo) 1.00 2.00 0.50 0.15 0.15
Progresiva 0+515(Lado Izquierdo) 1.00 1.00 1.20 0.15 0.18
Progresiva 0+655(Lado Izquierdo) 1.00 4.00 0.50 0.15 0.30

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 1.22 M3


Progresiva 0+430(Lado Izquierdo) Vereda 1.00 3.00 1.05 0.10 0.32
Progresiva 0+430(Lado Izquierdo) Sardinel 1.00 3.00 0.15 0.60 0.27
Progresiva 0+630(Lado Izquierdo) Vereda 1.00 2.00 0.50 0.10 0.10
Progresiva 0+630(Lado Izquierdo) Sardinel 1.00 2.00 0.15 0.20 0.06
Progresiva 0+515(Lado Izquierdo) Vereda 1.00 1.00 1.20 0.10 0.12
Progresiva 0+515(Lado Izquierdo) Sardinel 1.00 1.00 0.15 0.20 0.03
Progresiva 0+655(Lado Izquierdo) Vereda 1.00 4.00 0.50 0.10 0.20
Progresiva 0+655(Lado Izquierdo) Sardinel 1.00 4.00 0.15 0.20 0.12
1.1.12.10 BRUÑAS EN VEREDAS 15.00 M
Veredas de las progresivas anteriores 1.00 15.00 15.00

Sunday, March 5, 2023


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
Página 116

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS

1.1.12.11 CURADO DE CONCRETO 10.55 M2


Progresiva 0+430(Lado Izquierdo) Vereda 1.00 3.00 1.05 3.15
Progresiva 0+430(Lado Izquierdo) Sardinel 1.00 3.00 0.60 1.80
Progresiva 0+630(Lado Izquierdo) Vereda 1.00 2.00 0.50 1.00
Progresiva 0+630(Lado Izquierdo) Sardinel 1.00 2.00 0.20 0.40
Progresiva 0+515(Lado Izquierdo) Vereda 1.00 1.00 1.20 1.20
Progresiva 0+515(Lado Izquierdo) Sardinel 1.00 1.00 0.20 0.20
Progresiva 0+655(Lado Izquierdo) Vereda 1.00 4.00 0.50 2.00
Progresiva 0+655(Lado Izquierdo) Sardinel 1.00 4.00 0.20 0.80

Tuesday, March 7, 2023


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.6.2 SUB-RASANTE
1.1.6.2.2 CORTE DE TERRENO A NIVEL DE SUB RASANTE 196.56 M3
Progresiva 0+700 al 0+980 1.00 280.00 7.80 0.09 196.56
1.1.6.2.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 255.53 M3
Progresiva 0+700 al 0+980 1.00 280.00 7.80 0.09 255.53
1.1.12 VEREDAS Y GRADAS
1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 12.00 M
Progresiva 0+390 AL 0+ 402 (Lado derecho) Curva 1.00 12.00 12.00

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 12.60 M2


Progresiva 0+390 AL 0+ 402 (Lado derecho) Curva 1.00 12.00 1.05 12.60

1.1.12.5 BASE DE PIEDRA E=6" 1.89 M3


Progresiva 0+390 AL 0+ 402 (Lado derecho) Curva 1.00 12.00 1.05 0.15 1.89

Wednesday, March 8, 2023


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 1.00 UND
Progresiva 0+390 al 0+402km(Lado Derecho) 1.00 1.00

1.1.12 VEREDAS Y GRADAS


1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 7.00 M
Progresiva 0+200 (Lado Izquierdo) 1.00 7.00 7.00

1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 12.24 M2


Progresiva 0+200 (Lado Izquierdo) 1.00 3.60 3.40 12.24

1.1.12.5 BASE DE PIEDRA E=6" 1.84 M3


Progresiva 0+200 (Lado Izquierdo) 1.00 3.60 3.40 0.15 1.84

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 8.08 M3


Progresiva 0+370 AL 0+ 402 (Lado derecho) Curva Vereda 1.00 32.00 1.05 0.10 3.36
Progresiva 0+370 AL 0+ 402 (Lado derecho) Sardinel 1.00 32.00 0.15 0.60 2.88
Progresiva 0+200 Interseccion 1.00 3.60 3.40 0.15 1.84

Thursday, March 9, 2023


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.6.2 SUB-RASANTE
1.1.6.2.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 280.00 M
Progresiva 0+700 al 0+980 1.00 280.00 280.00
1.1.6.2.2 CORTE DE TERRENO A NIVEL DE SUB RASANTE 87.36 M3
Progresiva 0+700 al 0+980 1.00 280.00 7.80 0.04 87.36
1.1.6.2.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 113.57 M3
Progresiva 0+700 al 0+980 1.00 280.00 7.80 0.04 113.57
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 1.00 UND
Progresiva 0+390 al 0+402km(Lado Derecho) 1.00 1.00

1.1.12 VEREDAS Y GRADAS


1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 4.80 M2
Progresiva 0+884 al 0+888 (Lado derecho) 1.00 4.00 1.20 4.80

1.1.12.5 BASE DE PIEDRA E=6" 0.72 M3


Progresiva 0+884 al 0+888 (Lado derecho) 1.00 4.00 1.20 0.15 0.72

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 0.84 M3


Progresiva 0+884 al 0+888 (Lado derecho) Vereda 1.00 4.00 1.20 0.10 0.48
Progresiva 0+884 al 0+888 (Lado derecho) Sardinel 1.00 4.00 0.15 0.60 0.36
Página 117

MUNICIPALIDAD DISTRITAL DE SANTIAGO


GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PROGRAMADOS

Friday, March 10, 2023


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 3.00 UND
Progresiva 0+334 al 0+340(Lado derecho) 3.00 3.00
Progresiva 0+499 al 0+506(Lado derecho)
Progresiva 0+592 al 0+595(Lado derecho)
1.1.12 VEREDAS Y GRADAS
1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 16.50 M2
Progresiva 0+334 al 0+340(Lado derecho) 1.00 6.00 0.75 4.50
Progresiva 0+499 al 0+506(Lado derecho) 1.00 7.00 1.20 8.40
Progresiva 0+592 al 0+595(Lado derecho) 1.00 3.00 1.20 3.60
1.1.12.5 BASE DE PIEDRA E=6" 2.48 M3
Progresiva 0+334 al 0+340(Lado derecho) 1.00 6.00 0.75 0.15 0.68
Progresiva 0+499 al 0+506(Lado derecho) 1.00 7.00 1.20 0.15 1.26
Progresiva 0+592 al 0+595(Lado derecho) 1.00 3.00 1.20 0.15 0.54

1.1.12.7 CONCRETO f'c= 175 kg/cm2, EN VEREDAS Y SARDINELES 3.18 M3


Progresiva 0+334 al 0+340(Lado derecho)vereda 1.00 6.00 0.75 0.10 0.45
Progresiva 0+334 al 0+340(Lado derecho)sardinel 1.00 6.00 0.15 0.60 0.54
Progresiva 0+499 al 0+506(Lado derecho)vereda 1.00 7.00 1.20 0.10 0.84
Progresiva 0+499 al 0+506(Lado derecho)sardinel 1.00 7.00 0.15 0.60 0.63
Progresiva 0+592 al 0+595(Lado derecho)vereda 1.00 3.00 1.20 0.10 0.36
Progresiva 0+592 al 0+595(Lado derecho)sardinel 1.00 3.00 0.15 0.80 0.36
FORMATO - 13

22.3.- VALORIZACION POR MAYORES METRADOS DE OBRA


OBRA : RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE
LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1 OBRA VIAL
1.1 ADECUADA INFRAESTRUCTURA VEHICULAR Y PEATONAL -
1.1.1 OBRAS PROVISIONALES -
1.1.5 TRABAJOS COMPLEMENTARIOS -
1.1.5.1 REPOSICION DE COLECTOR GENERAL -
1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCC m 0 0.00 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS m³ 0 0.00 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.1.3 PERFILADO,
CAMA NIVELADO
DE APOYO Y COMPACTACION
CON MATERIAL MANUAL,
SELECCIONADA EN TE
PARA m² 0E=0.10M_x000D_
DE TUBERIA, 0.00 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.1.4 m 0 0.00 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) m 0 0.00 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m³ 0 0.00 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.3 CONEXIONES DOMICILIARIAS
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.2 TUBERIA PVC SAL DE Ø 6" m 0.00 - 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
Página 119

FORMATO - 13

22.4.- VALORIZACION POR PARTIDAS NUEVAS


OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1 OBRA VIAL_x000D_
1.1 ADECUADA INFRAESTRUCTURA VEHICULAR Y
PEATONAL
1.1.1 TRABAJOS COMPLEMENTARIOS
1.1.5.3 CONEXIONES DOMICILIARIAS
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.3 EXCAVACION MANUAL DE ZANJAS PARA LAS CAJAS DE m3 0.00 0.00 0.00% 4.28 0.00 #DIV/0! 4.28 0.00 #DIV/0! -4.28 0.00 #DIV/0!
REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.4 NIVELADO Y COMPACTADO LA BASE DE LA CAJA DE m2 0.00 0.00 0.00% 4.76 0.00 #DIV/0! 4.76 0.00 #DIV/0! -4.76 0.00 #DIV/0!
REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.5 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA m3 0.00 0.00 0.00% 1.99 0.00 #DIV/0! 1.99 0.00 #DIV/0! -1.99 0.00 #DIV/0!
MANUAL _x000D_
1.1.5.3.3 MOVIMIENTOS DE TIERRA PARA LAS CONEXIONES -
DOMICILIARIAS DE DESAGUE
1.1.5.3.3.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 0.00 53.24% 7.20 0.00 #DIV/0! 7.20 0.00 #DIV/0! -7.20 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.1.5.3.3.2 EXCAVACION MANUAL DE ZANJAS PARA LAS m3 0.00 0.00 32.76% 8.64 0.00 #DIV/0! 8.64 0.00 #DIV/0! -8.64 0.00 #DIV/0!
CONEXIONES DOMICILIARIAS EN TERRENO NORMAL
1.1.5.3.3.3 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA m3 0.00 0.00 64.00% 0.72 0.00 #DIV/0! 0.72 0.00 #DIV/0! -0.72 0.00 #DIV/0!
DE TUBERIA, E=0.10M_x000D_
1.1.5.3.3.4 RELLENADO CON MATERIAL SELECCIONADA m3 0.00 0.00 27.73% 1.44 0.00 #DIV/0! 1.44 0.00 #DIV/0! -1.44 0.00 #DIV/0!
E=0.2M_x000D_
1.1.5.3.3.5 RELLENO Y COMPACTADO MANUAL CON MATERIAL m3 0.00 0.00 62.74% 6.48 0.00 #DIV/0! 6.48 0.00 #DIV/0! -6.48 0.00 #DIV/0!
PROPIO
1.1.5.3.3.6 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA m3 0.00 0.00 10.10% 2.16 0.00 #DIV/0! 2.16 0.00 #DIV/0! -2.16 0.00 #DIV/0!
MANUAL _x000D_
1.1.5.3.3.7 ENCOFRADO Y DESENCOFRADO DE LA CAJA DE REGISTRO m2 0.00 0.00 5.09% 15.10 0.00 #DIV/0! 15.10 0.00 #DIV/0! -15.10 0.00 #DIV/0!
DE DESAGUE_x000D_
1.1.5.3.3.8 CONCRETO FC=175 KG/CM2 PARA LA CAJA DE REGISTRO m3 0.00 0.00 13.44% 1.53 0.00 #DIV/0! 1.53 0.00 #DIV/0! -1.53 0.00 #DIV/0!
DE DESAGGUE_x000D_
1.1.5.4 RED COLECTOR GENERAL DE DESAGUE. -
1.1.5.4.7 RELLENADO CON MATERIAL SELECIONADA E=0.2M m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.4.8 PUEBA HIDRAULICA EN TUBERIA DE m 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ALCANTARILLADO_x000D_
1.1.5.5 BUZONES -
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 0.00 53.41% 20.10 0.00 #DIV/0! 20.10 0.00 #DIV/0! -20.10 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ m3 0.00 0.00 58.16% 31.60 0.00 #DIV/0! 31.60 0.00 #DIV/0! -31.60 0.00 #DIV/0!
1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 0.00 7.46% 20.10 0.00 #DIV/0! 20.10 0.00 #DIV/0! -20.10 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA m3 0.00 0.00 4.91% 2.00 0.00 #DIV/0! 2.00 0.00 #DIV/0! -2.00 0.00 #DIV/0!
DE TUBERIA, E=0.10M_x000D_
1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE m3 0.00 0.00 23.08% 2.00 0.00 #DIV/0! 2.00 0.00 #DIV/0! -2.00 0.00 #DIV/0!
BUZON_x000D_
1.1.5.5.6 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 0.00 24.70% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES kg 0.00 0.00 5.60% 465.38 0.00 #DIV/0! 465.38 0.00 #DIV/0! -465.38 0.00 #DIV/0!
1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ m2 0.00 0.00 2.67% 45.23 0.00 #DIV/0! 45.23 0.00 #DIV/0! -45.23 0.00 #DIV/0!
1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON m3 0.00 0.00 13.68% 11.01 0.00 #DIV/0! 11.01 0.00 #DIV/0! -11.01 0.00 #DIV/0!
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA m3 0.00 0.00 5.73% 2.27 0.00 #DIV/0! 2.27 0.00 #DIV/0! -2.27 0.00 #DIV/0!
BASE DEL BUZON
1.1.5.5.11 TAPA DE CONCRETO PARA BUZON und 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ und 0.00 0.00 12.82% 8.00 0.00 #DIV/0! 8.00 0.00 #DIV/0! -8.00 0.00 #DIV/0!
1.1.5.5.13 ELIMINACION DE MATERIAL EXCEDENTE PRODUCTO DE m3 0.00 0.00 8.88% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
LA DEMOLICION DE BUZONES CON MAQUINARIA D=7KM
1.1.5.6 CONEXIÓN DE LA RED COLECTORA AL COLECTOR -
EXISTENTE _x000D_
Página 120
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.1.5.6.1 CORTE DE LOSA DE CONCRETO CON DISCO e=0.20 m. m 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.6.2 EXCAVACION MANUAL DE ZANJAS PARA LA CONEXIÓN m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DEL DESAGUEL A LA RED COLECTORA
1.1.5.6.3 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE TUBERIA, E=0.10M
1.1.5.6.4 TUBERIA PVC SAL DE Ø 8" (200 MM)_x000D_ m 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.6.5 RELLENADO CON MATERIAL SARANDEADO m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
E=0.2M_x000D_
1.1.5.6.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO
1.1.5.6.7 REPOSICION DEL PAVIMENTO RIGIDO EXISTENTE _x000D_ m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.7 LINEA DE DISTR. PARA EL SISTEMA DE AGUA POTABLE -
DE 4"
1.1.5.7.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 0.00 0.00 56.62% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.1.5.7.2 EXCAVACION DE ZANJA CON EQUIPO PARA LA LINEA DE m3 0.00 0.00 35.68% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DISTRIBUCION DE AGUA POTABLE
1.1.5.7.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 0.00 85.44% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.1.5.7.4 CAMA APOYO DE TUBERIA, E=0.10 M CON MATERIAL m3 0.00 0.00 72.48% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
SELECCIONADA
1.1.5.7.5 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 4" m 0.00 0.00 37.25% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.7.6 RELLENADO CON MATERIAL SARANDEADO m3 0.00 0.00 89.89% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
E=0.2M_x000D_
1.1.5.7.7 RELLENO Y COMPACTADO MANUAL CON MATERIAL m3 0.00 0.00 44.38% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO
1.1.5.7.8 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 0.00 14.72% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.1.5.7.9 PRUEBA HIDRAULICA EN LA TUBERIA DE LA LINEA DE m 0.00 0.00 36.44% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DISTRIBUCION_x000D_
1.1.5.7.1 DADO DE CONCRETO PARA SOPORTE DE LA TUBERIA -
DE 4"
1.1.5.7.1.1 ENCOFRADO Y DESENCOFRADO DE DADOS DE SOPORTE m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
_x000D_
1.1.5.7.1.2 CONCRETO FC=175 KG/CM2 PARA DADO DE SOPORTE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.8 REUBICACION DE LA LINEA DE DISTRIBUCION -
EXISTENTE
1.1.5.8.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.1.5.8.2 EXCAVACION MANUAL DE ZANJAS PARA LA LINEA DE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DISTRIBUCION DE AGUA EXISTENTE
1.1.5.8.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.1.5.8.4 CAMA DE ARENA PARA APOYO DE TUBERIA, m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
E=0.10M_x000D_
1.1.5.8.5 RELLENADO CON MATERIAL SARANDEADO m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
E=0.2M_x000D_
1.1.5.8.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO
1.1.5.8.7 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MANUAL_x000D_
1.1.5.8.8 PRUEBA HIDRAULICA EN LA TUBERIA DE LA LINEA DE m 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DISTRIBUCION_x000D_
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE -
1.1.5.9.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 0.00 0.00 64.06% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.9.2 CONSTRUCCION _x000D_DE ZANJAS PARA LA LINEA DE
EXCAVACION MANUAL m3 0.00 0.00 95.77% 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
-
DISTRIBUCION DE AGUA EXISTENTE
1.1.5.9.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 0.00 96.88% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.1.5.9.4 CAMA DE APOYO DE TUBERIA, E=0.10 M CON MATERIAL m3 0.00 0.00 90.89% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
SELECCIONADA _x000D_
1.1.5.9.5 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" C- und 0.00 0.00 18.26% 1.00 0.00 #DIV/0! 1.00 0.00 #DIV/0! -1.00 0.00 #DIV/0!
10 _x000D_
1.1.5.9.6 RELLENADO CON MATERIAL SARANDEADO m3 0.00 0.00 94.10% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
E=0.2M_x000D_
1.1.5.9.7 RELLENO Y COMPACTADO MANUAL CON MATERIAL m3 0.00 0.00 92.46% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO
1.1.5.9.8 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA m3 0.00 0.00 86.81% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MANUAL_x000D_
1.1.5.9.9 PRUEBA HIDRAULICA EN LA INSTALACIONES m 0.00 0.00 6.45% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DOMICILIARIAS
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM und 0.00 0.00 20.67% 48.00 0.00 #DIV/0! 48.00 0.00 #DIV/0! -48.00 0.00 #DIV/0!
1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m und 0.00 0.00 21.33% 46.00 0.00 #DIV/0! 46.00 0.00 #DIV/0! -46.00 0.00 #DIV/0!
1.1.7 MEJORAMIENTO DE SUB-RASANTE -
1.1.7.4 SUMINISTRO Y COLOCADO DE LA GEOMALLA _x000D_ m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.7.5 CORTE DE TERRENO CON MAQUINARIA PARA EL m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ENRROCADO DE LA SUB-RASANTE
Página 121
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.1.7.6 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA
1.1.7.7 ACOPIO DE PIEDRA GRANDE PARA EL ENRROCADO DE LA m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
SUB-RASANTE_x000D_
1.1.7.8 TRANSPORTE DE PIEDRA PARA ENRROCADO CON m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA PESADA
1.1.7.9 ENRROCADO CON PIEDRA GRANDE DE LA SUB-RASANTE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CON MAQUINARIA PESADA
1.1.9 SUPERFICIE DE RODADURA_x000D_ -
1.1.9.7 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE m 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTRUCCION EN LOSA_x000D_
1.1.9.8 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE m 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DILATACION EN LOSA
1.1.9.9 CONCRETO, f'c= 280 kg/cm2, EN SUPERFICIE DE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
RODADURA_x000D_
1.1.9.10 CURADO CON AGUA m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.10 DOWELLS O JUNTAS_x000D_ -
1.1.10.4 ACERO LISO FY= 4200 kg/cm2 GRADO 60 DE 1" PARA JUNTA kg 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TRANSVERSAL DE DILATACION
1.1.10.5 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 DE 3/4" kg 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PARA JUNTA TRANSVERSAL DE CONTRACCION O
1.1.10.6 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 DE 1/2" kg 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION
PARA JUNTAS LONGITUDINALES
1.1.11.1 EMBOQUILLADO DE LAS BERMAS LATERALES DE LA -
CAPRPETA DE RODADURA
1.1.11.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.1.11.1.2 NIVELADO Y COMPACTADO CON EQUIPO LIVIANO m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.1.3 CONCRETO FC=175KG/CM2 +PIEDRA MEDIANA _x000D_ m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.1.4 CURADO CON AGUA m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.12 VEREDAS Y GRADAS -
1.1.12.12 DEMOLICION DE VEREDAS EXISTENTE m2 0.00 0.00 87.94% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.12.13 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 0.00 20.21% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM PRODUCTO DE LA DEMOLICION DE
1.1.12.14 ACERO DE REFUERZO fy=4,200 kg/cm2 PARA SARDINEL DE kg 0.00 0.00 72.12% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
VEREDAS
VEREDA
1.1.19 PAVIMENTO FLEXIBLE -
1.1.19.1 CONFORMACION DE LA SUB-BASE E=0.15 M -
1.1.19.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.1.19.1.2 EXTRACCION Y APILAMIENTO MATERIAL OVER_x000D_ m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.19.1.3 EXTENDIDO Y COMPACTADO DE MATERIAL OVER m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
E=0.15M
1.1.19.2 CONFORMACION DE LA BASE E=0.20 M -
1.1.19.2.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.1.19.2.2 PREPARADO DE MATERIAL GRANULAR PARA BASE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.19.2.3 EXTENDIDO Y COMPACTADO DE MATERIAL DE BASE m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.19.2.4 RIEGO DE LA BASE_x000D_ m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.19.3 CARPETA ASFALTICA_x000D_ -
1.1.19.3.1 LIMPIEZA DEL AREA A IMPRIMAR (C/ m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
COMPRESORA)_x000D_
1.1.19.3.2 IMPRIMADO ASFALTICO CON CAMION m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
IMPRIMANTE_x000D_
1.1.19.3.3 SUMINISTRO Y COLOCACION DE LA CARPETA ASFALTICA m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
EN CALIENTE 2"
1.2 SISTEMA DE EVACUACION DE AGUAS -
PLUVIALES_x000D_
1.2.4 CAJAS DE DISTRIBUCION Y DE DISIPACION_x000D_ -
1.2.4.12 REJILLA METALICA PARA LAS CAJAS DE DISTRIBUCION Y m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE DISIPACION_x000D_
1.2.4.13 TAPA DE CONCRETO PARA CAJA DE DICIPACION und 0.00 0.00 37.50% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.6 SISTEMA DE EVACIACION DE AGUAS PLUVIALES CON 0.00 -
TUBERIA 10"_x000D_
1.2.6.1 LIMPIEZA DEL TERRENO DE FORMA MANUAL m2 0.00 0.00 50.46% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.6.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 0.00 50.20% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.2.6.3 EXCAVACION DE ZANJAS CON MAQUINARIA m3 0.00 0.00 36.57% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PESADA_x000D_
Página 122
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.2.6.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 0.00 60.59% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.2.6.5 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 0.00 54.36% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.2.6.6 CAMA DE APOYO DE TUBERIA, E=0.10 M CON MATERIAL m3 0.00 0.00 70.29% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
SELECCIONADA _x000D_
1.2.6.7 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 10" m 0.00 0.00 37.80% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.6.8 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 0.00 46.53% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
SELECCIONADO_x000D_
1.2.6.9 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 0.00 46.43% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.2.6.10 PRUEVAS HIDRAULICAS DE LA TUBERIA DEL SISTEMA DE m 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
EVACUACION DE AGUAS FLUVIALES
1.30 OBRAS DE ARTE Y SEÑALIZACION_x000D_ -
1.3.1.15 MUROS DE CONCRETO CICLOPEO -
1.3.1.15.1 MUROS DE CONCRETO CICLOPEO TIPO MC-03 TRAMO -
A_x000D_
1.3.1.15.1.1 LIMPIEZA DEL TERRENO MANUAL m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.1.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.1.15.1.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.1.15.1.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.3.1.15.1.5 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.1.15.1.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.1.15.1.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.1.15.1.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.1.9 CURADO CON AGUA m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.1.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.1.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.1.15.1.12 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.1.15.2 MUROS DE CONCRETO CICLOPEO TIPO MC-03 TRAMO -
B_x000D_
1.3.1.15.2.1 LIMPIEZA DEL TERRENO MANUAL m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.2.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.1.15.2.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.1.15.2.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.3.1.15.2.5 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.1.15.2.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.1.15.2.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.1.15.2.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.2.9 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.2.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.2.11 TUBERIA PVC SAL DE Ø 2" _x000D_ m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.2.12 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.1.15.2.13 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE DRENAJE TRANSVERSAL
1.3.1.15.2.14 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.1.15.3 MUROS DE CONCRETO CICLOPEO TIPO MC-04 -
1.3.1.15.3.1 LIMPIEZA DEL TERRENO MANUAL m2 0.00 0.00 48.19% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.3.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 0.00 66.52% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.1.15.3.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 0.00 50.72% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.1.15.3.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.3.1.15.3.5 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 0.00 72.31% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.1.15.3.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
Página 123
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.3.1.15.3.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.1.15.3.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.3.9 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.3.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.3.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.1.15.3.12 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.1.15.4 MUROS DE CONCRETO CICLOPEO TIPO MC-07_x000D_ -
1.3.1.15.4.1 LIMPIEZA DEL TERRENO MANUAL m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.4.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.1.15.4.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.1.15.4.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.3.1.15.4.5 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.1.15.4.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.1.15.4.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.1.15.4.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.4.9 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.4.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.4.11 TUBERIA PVC SAL DE Ø 2" _x000D_ m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.4.12 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.1.15.4.13 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE DRENAJE TRANSVERSAL
1.3.1.15.4.14 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.1.15.5 MUROS DE CONCRETO CICLOPEO TIPO MC-08 TRAMO -
A_x000D_
1.3.1.15.5.1 LIMPIEZA DEL TERRENO MANUAL m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.5.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.1.15.5.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.1.15.5.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.3.1.15.5.5 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.1.15.5.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.1.15.5.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.1.15.5.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.5.9 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.5.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.5.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.1.15.5.12 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.1.15.70 MUROS DE CONCRETO CICLOPEO TIPO MC-09_x000D_ -
1.3.1.15.71 LIMPIEZA DEL TERRENO MANUAL m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.72 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.1.15.73 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.1.15.74 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
1.3.1.15.75 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.1.15.76 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.1.15.77 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.1.15.78 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.79 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
Página 124
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.3.1.15.80 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.81 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.1.15.82 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.2 MUROS DE CONCRETO ARMADO -
1.3.2.14. MUROS DE CONCRETO ARMADO TIPO MC 01 TRAMO A -
1.3.2.14.1 LIMPIEZA DEL TERRENO MANUAL m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.14.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.2.14.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.2.14.4 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.2.14.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.2.14.6 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.14.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.2.14.8 CONCRETO f'c=210 kg/cm2 m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.14.9 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.14.10 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTRUCCION EN LOSA_x000D_
1.3.2.14.11 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.14.12 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.2.14.13 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.2.15 MUROS DE CONCRETO ARMADO TIPO MC 01 TRAMO B -
1.3.2.15.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.2.15.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.2.15.3 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.2.15.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.2.15.5 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.15.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.2.15.7 CONCRETO f'c=210 kg/cm2 m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.15.8 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.15.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTRUCCION EN LOSA_x000D_
1.3.2.15.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.15.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.2.15.12 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.2.16 MUROS DE CONCRETO ARMADO TIPO MC 02 TRAMO A -
1.3.2.16.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.2.16.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.2.16.3 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.2.16.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.2.16.5 ACERO DE REFUERZO fy=4,200 kg/cm2 PARA EL MURO DE kg 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.2.16.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.2.16.7 CONCRETO f'c=210 kg/cm2 PARA EL MURO DE CONTENCION m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.16.8 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.16.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTRUCCION EN LOSA_x000D_
1.3.2.16.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.16.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.2.16.12 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
Página 125
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.3.2.17 MUROS DE CONCRETO ARMADO TIPO MC 02 TRAMO B -
1.3.2.17.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.2.17.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.2.17.3 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.2.17.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.2.17.5 ACERO DE REFUERZO fy=4,200 kg/cm2 PARA EL MURO DE kg 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.2.17.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.2.17.7 CONCRETO f'c=210 kg/cm2 PARA EL MURO DE CONTENCION m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.17.8 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.17.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTRUCCION EN LOSA_x000D_
1.3.2.17.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.17.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.2.17.12 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.2.18 MUROS DE CONCRETO ARMADO TIPO MC-06 -
1.3.2.18.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.2.18.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.2.18.3 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.2.18.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.2.18.5 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.18.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.2.18.7 CONCRETO f'c=210 kg/cm2 m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.18.8 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.18.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTRUCCION EN LOSA_x000D_
1.3.2.18.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.18.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.2.18.12 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.2.19. MUROS DE CONCRETO ARMADO TIPO MC 08 TRAMO B -
1.3.2.19.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.2.19.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BASE DEL MURO _x000D_
1.3.2.19.3 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.2.19.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE CONTENCION
1.3.2.19.5 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.19.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION
1.3.2.19.7 CONCRETO f'c=210 kg/cm2 m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.19.8 CURADO CON AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.19.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTRUCCION EN LOSA_x000D_
1.3.2.19.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.19.11 RELLENADO Y COMPACTADO CON MATERIAL m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PROPIO_x000D_
1.3.2.19.12 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
ZANJAS DE SUBDRENAJE LONGITUDINAL
1.3.2.20. MUROS DE CONTENCION CON GAVIONES_x000D_ -
1.3.2.20.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.2.20.2 CORTE DE TERRENO CON MAQUINARIA PARA EL MURO m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
DE GAVIONERIA_x000D_
1.3.2.20.3 EXCAVACION MANUAL DE ZANJAS PARA EL MURO DE m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONTENCION _x000D_
1.3.2.20.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
TERRENO NORMAL_x000D_
Página 126
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.3.2.20.5 ELIMINACION DE MATERIAL EXCEDENTE CON m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
MAQUINARIA D=7KM_x000D_
1.3.2.20.6 APROVICIONAMIENTO Y ARMADO DE GAVIONES DE und 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1X1X5
1.3.2.20.7 APROVICIONAMIENTO Y ARMADO DE GAVIONES DE und 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.5X1X5
1.3.2.21. LLENADO, PERFILADO Y COCIDO DE TAPAS DE -
GAVIONES_x000D_
1.3.2.21.1 ACOPIO DE PIEDRA GRANDE_x000D_ m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.21.2 LLENADO DE GAVIONES m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.21.3 PERFILADO Y COCIDO DE LA TAPA DE GAVIONES und 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.22. BANQUETAS ESTABILIZADORAS -
1.3.2.22.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
CONSTRUCCION _x000D_
1.3.2.22.2 CORTE DE TERRENO DE FORMA MANUAL PARA LAS m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
BANQUETAS
1.3.2.23. FORESTACION DE LAS BANQUETAS ESTABILIZADORAS -
1.3.2.23.1 EXCAVACION DE HOYOS DE FORMA MANUAL PARA LA m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
PLANTACION DE EUCALIPTO
1.3.2.23.2 PLANTACIONES DE EUCALIPTO und 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.7 ESTUDIOS GEOTECNICOS -
1.3.7.1 ESTUDIO DE MECANICA DE SUELOS und 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.7.2 DISEÑO DEL PAVIMENTO und 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.7.3 DISEÑO DE MURO DE CONTENCION und 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
5.3.- DIARIOS POR MAYORES METRADOS DE OBRA

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO –
PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023

AVANCE MENSUAL TOTAL


PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MES
ANTER. Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu CANT.
DESCRIPCION DE PARTIDA UND CANT

### 1 OBRA VIAL


1.1 ADECUADA INFRAESTRUCTURA VEHICULAR Y PEATONAL
1.1.1 OBRAS PROVISIONALES
1.1.5 TRABAJOS COMPLEMENTARIOS
1.1.5.1 REPOSICION DE COLECTOR GENERAL
1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION m 0.00
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS m³ 0.00
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL,PARA
EN TERRENO m²
NO E=0.10M_x000D_ 0.00
CAMA DE APOYO CON MATERIAL SELECCIONADA DE TUBERIA,
1.1.5.1.4 m 0.00
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) m 0.00
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m³ 0.00
1.1.5.3 CONEXIONES DOMICILIARIAS 0.00
1.1.5.3.1 ACCESORIOS 0.00
1.1.5.3.1.2 TUBERIA PVC SAL DE Ø 6" m 0.00
MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO
GERENCIA DE INFRAESTRUCTURA

MEJORAMIENTO Y TRATAMIENTO DE LA CIRCUNVALACION DE LOS BARRIOS DE KANCHISPUGIO,


OBRA: VALDIVIESO BUENO, VILLA DEL ROSARIO, PIOC, CONCHUPATA ALTA Y BAJA, VIRGEN DEL
CARMEN Y CARPAPAMPA, DISTRITO DE PAUCARTAMBO, PROVINCIA DE PAUCARTAMBO CUSCO”

HOJA DE SUSTENTO DE METRADOS - MAYORES METRADOS

Monday, March 7, 2022

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.1 REPOSICION DE COLECTOR GENERAL
1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 7.50 M
Progresiva 0+970 al 0+977.50 7.50 7.50
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 28.13 M3
Progresiva 0+970 al 0+977.50 7.50 1.50 2.50 28.13
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 13.50 M2
Progresiva 0+970 al 0+977.50 1.00 7.50 1.80 13.50
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 7.50 M
Progresiva 0+970 al 0+977.50 1.00 7.50 7.50
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 7.50 M
Progresiva 0+970 al 0+977.50 1.00 7.50 7.50
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO M3

1.1.5.3 CONEXIONES DOMICILIARIAS 0.00 M2

1.1.5.3.1 ACCESORIOS 0.00

1.1.5.3.1.2 TUBERIA PVC SAL DE Ø 6" M3

Tuesday, March 8, 2022

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.1 REPOSICION DE COLECTOR GENERAL


1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 1.20 M
Progresiva 0+950 1.20 1.20
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 1.44 M3
Progresiva 0+950 1.20 0.60 2.00 1.44
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 4.80 M2
Progresiva 0+950 2.00 1.20 2.00 4.80
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 1.20 M
Progresiva 0+950 1.00 1.20 1.20
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 1.20 M
Progresiva 0+950 1.00 1.20 1.20
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO 1.44 M3
Progresiva 0+950 1.00 1.20 0.60 2.00 1.44

Wednesday, March 9, 2022

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.1 REPOSICION DE COLECTOR GENERAL


1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 8.50 M
Progresiva 0+922 8.50 8.50
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 10.20 M3
Progresiva 0+922 8.50 0.60 2.00 10.20
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 15.30 M2
Progresiva 0+922 1.00 8.50 1.80 15.30
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 8.50 M
Progresiva 0+922 1.00 8.50 8.50
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 8.50 M
Progresiva 0+922 1.00 8.50 8.50
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO 10.20 M3
Progresiva 0+922 1.00 8.50 0.60 2.00 10.20

Thursday, March 10, 2022

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.1 REPOSICION DE COLECTOR GENERAL


1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 6.80 M
Progresiva 0+870 6.80 6.80
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 6.53 M3
Progresiva 0+870 6.80 0.60 1.60 6.53
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 10.88 M2
Progresiva 0+870 1.00 6.80 1.60 10.88
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 6.80 M
Progresiva 0+870 1.00 6.80 6.80
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 6.80 M
Progresiva 0+870 1.00 6.80 6.80
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO 6.53 M3
Progresiva 0+870 1.00 6.80 0.60 1.60 6.53
Friday, March 11, 2022

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.1 REPOSICION DE COLECTOR GENERAL


1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 7.00 M
Progresiva 0+845 7.00 7.00
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 6.72 M3
Progresiva 0+845 7.00 0.60 1.60 6.72
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 11.20 M2
Progresiva 0+845 1.00 7.00 1.60 11.20
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 7.00 M
Progresiva 0+845 1.00 7.00 7.00
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 8.50 M
Progresiva 0+845 1.00 8.50 8.50
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO 6.72 M3
Progresiva 0+845 1.00 7.00 0.60 1.60 6.72

Saturday, March 12, 2022

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.1 REPOSICION DE COLECTOR GENERAL


1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 6.00 M
Progresiva 0+845 6.00 6.00
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 5.76 M3
Progresiva 0+845 6.00 0.60 1.60 5.76
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 9.60 M2
Progresiva 0+845 1.00 6.00 1.60 9.60
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 6.00 M
Progresiva 0+845 1.00 6.00 6.00
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 6.00 M
Progresiva 0+845 1.00 6.00 6.00
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO 5.76 M3
Progresiva 0+845 1.00 6.00 0.60 1.60 5.76

Monday, March 14, 2022

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.1 REPOSICION DE COLECTOR GENERAL


1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 6.00 M
Progresiva 0+950 6.00 6.00
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 5.76 M3
Progresiva 0+950 6.00 0.60 1.60 5.76
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 9.60 M2
Progresiva 0+950 1.00 6.00 1.60 9.60
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 6.00 M
Progresiva 0+950 1.00 6.00 6.00
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 8.50 M
Progresiva 0+950 1.00 8.50 8.50
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO 5.76 M3
Progresiva 0+950 1.00 6.00 0.60 1.60 5.76

Wednesday, March 16, 2022

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.1 REPOSICION DE COLECTOR GENERAL


1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 7.50 M
Progresiva 0+750 1.00 7.50 7.50
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 7.20 M3
Progresiva 0+750 1.00 7.50 0.60 1.60 7.20
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 4.50 M2
Progresiva 0+750 7.50 0.60 4.50
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 7.50 M
Progresiva 0+750 1.00 7.50 7.50
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 7.50 M
Progresiva 0+750 1.00 7.50 7.50
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO 7.20 M3
Progresiva 0+750 1.00 7.50 0.60 1.60 7.20
5.4.- METRADOS DIARIOS POR PARTIDAS NUEVAS DE OBRA

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE
SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023

AVANCE MENSUAL TOTAL


PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MES
ANT. Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT CANT.

### 1 OBRA VIAL_x000D_ 0.00


1.1 ADECUADA INFRAESTRUCTURA VEHICULAR Y PEATONAL 0.00
1.1.1 TRABAJOS COMPLEMENTARIOS 0.00
1.1.5.3 CONEXIONES DOMICILIARIAS 0.00
1.1.5.3.2 CAJAS DE REGISTRO 0.00
1.1.5.3.2.3 EXCAVACION MANUAL DE ZANJAS PARA LAS CAJAS DE m3 75.60 0.00 1.01 0.50 0.76 1.01 0.50 0.50 4.28
REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.4 NIVELADO Y COMPACTADO LA BASE DE LA CAJA DE REGISTRO m2 84.00 0.00 1.12 0.56 0.84 1.12 0.56 0.56 4.76
DE DESAGUE_x000D_
1.1.5.3.2.5 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL m3 86.94 0.00 0.60 0.15 0.34 0.60 0.15 0.15 1.99
_x000D_
1.1.5.3.3 MOVIMIENTOS DE TIERRA PARA LAS CONEXIONES DOMICILIARIAS DE DESAGUE 0.00
1.1.5.3.3.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 900.00 0.00 7.20 7.20
CONSTRUCCION _x000D_
1.1.5.3.3.2 EXCAVACION MANUAL DE ZANJAS PARA LAS CONEXIONES m3 810.00 0.00 8.64 8.64
DOMICILIARIAS EN TERRENO NORMAL
1.1.5.3.3.3 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE m3 90.00 0.00 0.72 0.72
TUBERIA, E=0.10M_x000D_
1.1.5.3.3.4 RELLENADO CON MATERIAL SELECCIONADA E=0.2M_x000D_ m3 180.00 0.00 1.44 1.44
1.1.5.3.3.5 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m3 315.00 0.00 6.48 6.48
1.1.5.3.3.6 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL m3 495.00 0.00 2.16 2.16
_x000D_
1.1.5.3.3.7 ENCOFRADO Y DESENCOFRADO DE LA CAJA DE REGISTRO DE m2 266.40 0.00 3.55 1.78 2.66 3.55 1.78 1.78 15.10
DESAGUE_x000D_
1.1.5.3.3.8 CONCRETO FC=175 KG/CM2 PARA LA CAJA DE REGISTRO DE m3 26.64 0.00 0.36 0.18 0.27 0.36 0.18 0.18 1.53
DESAGGUE_x000D_
1.1.5.4 RED COLECTOR GENERAL DE DESAGUE. 0.00
1.1.5.4.7 RELLENADO CON MATERIAL SELECIONADA E=0.2M m3 296.35 0.00 0.00
1.1.5.4.8 PUEBA HIDRAULICA EN TUBERIA DE ALCANTARILLADO_x000D_ m 2,469.57 0.00 0.00
1.1.5.5 BUZONES 0.00
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 47.20 0.00 4.02 4.02 4.02 2.01 2.01 2.01 2.01 20.10
CONSTRUCCION _x000D_
1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ m3 75.52 0.00 6.43 6.43 6.43 3.22 3.22 3.22 2.65 31.60
1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 189.80 0.00 4.02 4.02 4.02 2.01 2.01 2.01 2.01 20.10
TERRENO NORMAL_x000D_
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE m3 11.86 0.00 0.40 0.40 0.40 0.20 0.20 0.20 0.20 2.00
TUBERIA, E=0.10M_x000D_
1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ m3 11.86 0.00 0.40 0.40 0.40 0.20 0.20 0.20 0.20 2.00
1.1.5.5.6 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 86.85 0.00 0.00
D=7KM_x000D_
1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES kg 6,433.50 0.00 86.42 86.42 86.42 51.53 51.53 51.53 51.53 465.38
1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ m2 289.15 0.00 9.05 9.05 9.05 4.52 4.52 4.52 4.52 45.23
1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON m3 101.17 0.00 1.76 2.11 2.11 1.06 1.06 1.85 1.06 11.01
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE m3 48.38 0.00 0.45 0.45 0.45 0.23 0.23 0.23 0.23 2.27
DEL BUZON
1.1.5.5.11 TAPA DE CONCRETO PARA BUZON und 59.00 0.00 0.00
1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ und 50.69 0.00 2.00 2.00 1.00 1.00 1.00 1.00 8.00
1.1.5.5.13 ELIMINACION DE MATERIAL EXCEDENTE PRODUCTO DE LA m3 50.69 0.00 0.00
DEMOLICION DE BUZONES CON MAQUINARIA D=7KM
1.1.5.6 CONEXIÓN DE LA RED COLECTORA AL COLECTOR EXISTENTE 0.00 0.00
_x000D_
1.1.5.6.1 CORTE DE LOSA DE CONCRETO CON DISCO e=0.20 m. m 0.78 0.00 0.00
1.1.5.6.2 EXCAVACION MANUAL DE ZANJAS PARA LA CONEXIÓN DEL m3 4.68 0.00 0.00
DESAGUEL A LA RED COLECTORA
1.1.5.6.3 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE m3 0.39 0.00 0.00
TUBERIA, E=0.10M
1.1.5.6.4 TUBERIA PVC SAL DE Ø 8" (200 MM)_x000D_ m 6.65 0.00 0.00
AVANCE MENSUAL TOTAL
PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MES
ANT. Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT CANT.
1.1.5.6.5 RELLENADO CON MATERIAL SARANDEADO E=0.2M_x000D_ m3 0.78 0.00 0.00
1.1.5.6.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m3 2.93 0.00 0.00
1.1.5.6.7 REPOSICION DEL PAVIMENTO RIGIDO EXISTENTE _x000D_ m3 0.78 0.00 0.00
1.1.5.7 LINEA DE DISTRIBUCION PARA EL SISTEMA DE AGUA POTABLE 0.00 0.00
DE 4"
1.1.5.7.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 1,481.74 0.00 0.00
CONSTRUCCION _x000D_
1.1.5.7.2 EXCAVACION DE ZANJA CON EQUIPO PARA LA LINEA DE m3 1,926.26 0.00 0.00
DISTRIBUCION DE AGUA POTABLE
1.1.5.7.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 1,481.74 0.00 0.00
TERRENO NORMAL_x000D_
1.1.5.7.4 CAMA APOYO DE TUBERIA, E=0.10 M CON MATERIAL m3 148.17 0.00 0.00
SELECCIONADA
1.1.5.7.5 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 4" m 2,469.57 0.00 0.00
1.1.5.7.6 RELLENADO CON MATERIAL SARANDEADO E=0.2M_x000D_ m3 296.35 0.00 0.00
1.1.5.7.7 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m3 1,111.31 0.00 0.00
1.1.5.7.8 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 814.96 0.00 0.00
D=7KM_x000D_
1.1.5.7.9 PRUEBA HIDRAULICA EN LA TUBERIA DE LA LINEA DE m 2,469.57 0.00 0.00
DISTRIBUCION_x000D_
1.1.5.7.1 DADO DE CONCRETO PARA SOPORTE DE LA TUBERIA DE 4" 0.00 0.00
1.1.5.7.1.1 ENCOFRADO Y DESENCOFRADO DE DADOS DE SOPORTE m2 4.32 0.00 0.00
_x000D_
1.1.5.7.1.2 CONCRETO FC=175 KG/CM2 PARA DADO DE SOPORTE m3 0.65 0.00 0.00
1.1.5.8 REUVICACION DE LA LINEA DE DISTRIBUCION EXISTENTE 0.00 0.00
1.1.5.8.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 750.75 0.00 0.00
CONSTRUCCION _x000D_
1.1.5.8.2 EXCAVACION MANUAL DE ZANJAS PARA LA LINEA DE m3 900.90 0.00 0.00
DISTRIBUCION DE AGUA EXISTENTE
1.1.5.8.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 750.75 0.00 0.00
TERRENO NORMAL_x000D_
1.1.5.8.4 CAMA DE ARENA PARA APOYO DE TUBERIA, E=0.10M_x000D_ m3 75.08 0.00 0.00
1.1.5.8.5 RELLENADO CON MATERIAL SARANDEADO E=0.2M_x000D_ m3 150.15 0.00 0.00
1.1.5.8.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m3 412.91 0.00 0.00
1.1.5.8.7 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA m3 487.99 0.00 0.00
MANUAL_x000D_
1.1.5.8.8 PRUEBA HIDRAULICA EN LA TUBERIA DE LA LINEA DE m 1,251.25 0.00 0.00
DISTRIBUCION_x000D_
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE 0.00 0.00
1.1.5.9.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 384.00 0.00 0.00
CONSTRUCCION _x000D_
1.1.5.9.2 EXCAVACION MANUAL DE ZANJAS PARA LA LINEA DE m3 295.20 0.00 0.00
DISTRIBUCION DE AGUA EXISTENTE
1.1.5.9.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 384.00 0.00 0.00
TERRENO NORMAL_x000D_
1.1.5.9.4 CAMA DE APOYO DE TUBERIA, E=0.10 M CON MATERIAL m3 38.40 0.00 0.00
SELECCIONADA _x000D_
1.1.5.9.5 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" C-10 und 854.40 0.00 1.00
_x000D_
1.1.5.9.6 RELLENADO CON MATERIAL SARANDEADO E=0.2M_x000D_ m3 85.44 0.00 0.00
1.1.5.9.7 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO m3 128.16 0.00 0.00
1.1.5.9.8 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA m3 34.56 0.00 0.00
MANUAL_x000D_
1.1.5.9.9 PRUEBA HIDRAULICA EN LA INSTALACIONES DOMICILIARIAS m 2,790.00 0.00 0.00
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM _x000D_ und 300.00 0.00 12.00 4.00 1.00 1.00 5.00 6.00 1.00 2.00 2.00 6.00 3.00 2.00 3.00 48.00
1.1.5.9.11 TAPA DE MATAL PARA REGISTRO DE 0.25 X 0.60 m und 300.00 0.00 6.00 4.00 1.00 1.00 5.00 3.00 1.00 2.00 6.00 3.00 2.00 3.00 46.00
1.1.7 MEJORAMIENTO DE SUB-RASANTE 0.00 0.00
1.1.7.4 SUMINISTRO Y COLOCADO DE LA GEOMALLA _x000D_ m2 14,817.42 0.00 0.00
1.1.7.5 CORTE DE TERRENO CON MAQUINARIA PARA EL ENRROCADO m3 1,200.00 0.00 0.00
DE LA SUB-RASANTE
1.1.7.6 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 1,320.00 0.00 0.00
1.1.7.7 ACOPIO DE PIEDRA GRANDE PARA EL ENRROCADO DE LA SUB- m3 1,200.00 0.00 0.00
RASANTE_x000D_
1.1.7.8 TRANSPORTE DE PIEDRA PARA ENRROCADO CON MAQUINARIA m3 1,200.00 0.00 0.00
PESADA
1.1.7.9 ENRROCADO CON PIEDRA GRANDE DE LA SUB-RASANTE CON m3 1,200.00 0.00 0.00
MAQUINARIA PESADA
1.1.9 SUPERFICIE DE RODADURA_x000D_ 0.00 0.00
1.1.9.7 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE CONTRUCCION m 1,650.00 0.00 0.00
EN LOSA_x000D_
1.1.9.8 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE DILATACION EN m 4,944.00 0.00 0.00
LOSA
1.1.9.9 CONCRETO, f'c= 280 kg/cm2, EN SUPERFICIE DE m3 2,963.48 0.00 0.00
RODADURA_x000D_
AVANCE MENSUAL TOTAL
PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MES
ANT. Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT CANT.
1.1.9.10 CURADO CON AGUA m2 14,817.42 0.00 0.00
1.1.10 DOWELLS O JUNTAS_x000D_ 0.00 0.00
1.1.10.4 ACERO LISO FY= 4200 kg/cm2 GRADO 60 DE 1" PARA JUNTA kg 13,174.00 0.00 0.00
TRANSVERSAL DE DILATACION
1.1.10.5 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 DE 3/4" PARA kg 22,149.12 0.00 0.00
JUNTA TRANSVERSAL DE CONTRACCION O CONSTRUCCION
1.1.10.6 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 DE 1/2" PARA kg 2,015.17 0.00 0.00
JUNTAS LONGITUDINALES
1.1.11.1 EMBOQUILLADO DE LAS BERMAS LATERALES DE LA CAPRPETA 0.00 0.00
DE RODADURA
1.1.11.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 942.24 0.00 0.00
CONSTRUCCION _x000D_
1.1.11.1.2 NIVELADO Y COMPACTADO CON EQUIPO LIVIANO m2 942.24 0.00 0.00
1.1.11.1.3 CONCRETO FC=175KG/CM2 +PIEDRA MEDIANA _x000D_ m3 75.38 0.00 0.00
1.1.11.1.4 CURADO CON AGUA m2 942.24 0.00 0.00
1.1.12 VEREDAS Y GRADAS_x000D_ 0.00 0.00
1.1.12.12 DEMOLICION DE VEREDAS EXISTENTE_x000D_ m2 170.25 0.00 0.00
1.1.12.13 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 170.25 0.00 0.00
D=7KM PRODUCTO DE LA DEMOLICION DE VEREDAS
1.1.12.14 ACERO DE REFUERZO fy=4,200 kg/cm2 PARA SARDINEL DE kg 1,178.54 0.00 0.00
VEREDA
1.1.19 PAVIMENTO FLEXIBLE 0.00 0.00
1.1.19.1 CONFORMACION DE LA SUB-BASE E=0.15 M 0.00 0.00
1.1.19.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 400.00 0.00 0.00
CONSTRUCCION _x000D_
1.1.19.1.2 EXTRACCION Y APILAMIENTO MATERIAL OVER_x000D_ m3 60.00 0.00 0.00
1.1.19.1.3 EXTENDIDO Y COMPACTADO DE MATERIAL OVER E=0.15M m2 400.00 0.00 0.00
1.1.19.2 CONFORMACION DE LA BASE E=0.20 M 0.00 0.00
1.1.19.2.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m3 400.00 0.00 0.00
CONSTRUCCION _x000D_
1.1.19.2.2 PREPARADO DE MATERIAL GRANULAR PARA BASE m3 80.00 0.00 0.00
1.1.19.2.3 EXTENDIDO Y COMPACTADO DE MATERIAL DE BASE m3 400.00 0.00 0.00
1.1.19.2.4 RIEGO DE LA BASE_x000D_ m2 400.00 0.00 0.00
1.1.19.3 CARPETA ASFALTICA_x000D_ 0.00 0.00
1.1.19.3.1 LIMPIEZA DEL AREA A IMPRIMAR (C/ COMPRESORA)_x000D_ m2 400.00 0.00 0.00
1.1.19.3.2 IMPRIMADO ASFALTICO CON CAMION IMPRIMANTE_x000D_ m2 100.00 0.00 0.00
1.1.19.3.3 SUMINISTRO Y COLOCACION DE LA CARPETA ASFALTICA EN m2 20.00 0.00 0.00
CALIENTE 2"
1.2 SISTEMA DE EVACUACION DE AGUAS PLUVIALES_x000D_ 0.00 0.00
1.2.4 CAJAS DE DISTRIBUCION Y DE DISIPACION_x000D_ 0.00 0.00
1.2.4.12 REJILLA METALICA PARA LAS CAJAS DE DISTRIBUCION Y DE m2 60.50 0.00 0.00
DISIPACION_x000D_
1.2.4.13 TAPA DE CONCRETO PARA CAJA DE DICIPACION und 8.00 0.00 0.00
1.2.6 SISTEMA DE EVACIACION DE AGUAS FLUVIALES CON TUBERIA 10"_x000D_ 0.00 0.00
1.2.6.1 LIMPIEZA DEL TERRENO DE FORMA MANUAL m2 1,583.74 0.00 0.00
1.2.6.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 1,583.74 0.00 0.00
CONSTRUCCION _x000D_
1.2.6.3 EXCAVACION DE ZANJAS CON MAQUINARIA PESADA_x000D_ m3 2,058.86 0.00 0.00
1.2.6.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 1,583.74 0.00 0.00
TERRENO NORMAL_x000D_
1.2.6.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 237.56 0.00 0.00
D=7KM_x000D_
1.2.6.6 CAMA DE APOYO DE TUBERIA, E=0.10 M CON MATERIAL m3 158.37 0.00 0.00
SELECCIONADA _x000D_
1.2.6.7 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 10" m 2,639.57 0.00 0.00
1.2.6.8 RELLENADO Y COMPACTADO CON MATERIAL m3 316.75 0.00 0.00
SELECCIONADO_x000D_
1.2.6.9 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 1,346.18 0.00 0.00
1.2.6.10 PRUEVAS HIDRAULICAS DE LA TUBERIA DEL SISTEMA DE m 2,639.57 0.00 0.00
EVACUACION DE AGUAS FLUVIALES
1.30 OBRAS DE ARTE Y SEÑALIZACION_x000D_ 0.00 0.00
1.3.1.15 MUROS DE CONCRETO CICLOPEO 0.00 0.00
1.3.1.15.1 MUROS DE CONCRETO CICLOPEO TIPO MC-03 TRAMO A_x000D_ 0.00 0.00
1.3.1.15.1.1 LIMPIEZA DEL TERRENO MANUAL m2 10.40 0.00 0.00
1.3.1.15.1.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 4.80 0.00 0.00
CONSTRUCCION _x000D_
AVANCE MENSUAL TOTAL
PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MES
ANT. Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT CANT.
1.3.1.15.1.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 4.32 0.00 0.00
MURO _x000D_
1.3.1.15.1.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 4.80 0.00 0.00
TERRENO NORMAL_x000D_
1.3.1.15.1.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 4.97 0.00 0.00
D=7KM_x000D_
1.3.1.15.1.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 0.48 0.00 0.00
CONTENCION
1.3.1.15.1.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 13.71 0.00 0.00
1.3.1.15.1.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 5.07 0.00 0.00
1.3.1.15.1.9 CURADO CON AGUA m2 12.51 0.00 0.00
1.3.1.15.1.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 3.50 0.00 0.00
1.3.1.15.1.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 0.27 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.1.15.1.12 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 3.72 0.00 0.00
1.3.1.15.2 MUROS DE CONCRETO CICLOPEO TIPO MC-03 TRAMO B_x000D_ 0.00 0.00
1.3.1.15.2.1 LIMPIEZA DEL TERRENO MANUAL m2 12.00 0.00 0.00
1.3.1.15.2.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 10.40 0.00 0.00
CONSTRUCCION _x000D_
1.3.1.15.2.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 9.36 0.00 0.00
MURO _x000D_
1.3.1.15.2.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 7.80 0.00 0.00
TERRENO NORMAL_x000D_
1.3.1.15.2.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 10.76 0.00 0.00
D=7KM_x000D_
1.3.1.15.2.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 0.78 0.00 0.00
CONTENCION
1.3.1.15.2.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 28.25 0.00 0.00
1.3.1.15.2.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 13.56 0.00 0.00
1.3.1.15.2.9 CURADO CON AGUA m2 23.31 0.00 0.00
1.3.1.15.2.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 3.50 0.00 0.00
1.3.1.15.2.11 TUBERIA PVC SAL DE Ø 2" _x000D_ m 2.20 0.00 0.00
1.3.1.15.2.12 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 0.27 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.1.15.2.13 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 0.27 0.00 0.00
DRENAJE TRANSVERSAL
1.3.1.15.2.14 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 10.74 0.00 0.00
1.3.1.15.3 MUROS DE CONCRETO CICLOPEO TIPO MC-04 0.00 0.00
1.3.1.15.3.1 LIMPIEZA DEL TERRENO MANUAL m2 124.50 0.00 0.00
1.3.1.15.3.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 90.20 0.00 0.00
CONSTRUCCION _x000D_
1.3.1.15.3.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 72.16 0.00 0.00
MURO _x000D_
1.3.1.15.3.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 90.20 0.00 0.00
TERRENO NORMAL_x000D_
1.3.1.15.3.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 82.98 0.00 0.00
D=7KM_x000D_
1.3.1.15.3.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 9.02 0.00 0.00
CONTENCION
1.3.1.15.3.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 166.44 0.00 0.00
1.3.1.15.3.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 68.88 0.00 0.00
1.3.1.15.3.9 CURADO CON AGUA m2 272.24 0.00 0.00
1.3.1.15.3.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 82.00 0.00 0.00
1.3.1.15.3.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 7.38 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.1.15.3.12 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 32.80 0.00 0.00
1.3.1.15.4 MUROS DE CONCRETO CICLOPEO TIPO MC-07_x000D_ 0.00 0.00
1.3.1.15.4.1 LIMPIEZA DEL TERRENO MANUAL m2 30.00 0.00 0.00
1.3.1.15.4.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 21.60 0.00 0.00
CONSTRUCCION _x000D_
1.3.1.15.4.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 21.60 0.00 0.00
MURO _x000D_
p 1.3.1.15.4.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 21.60 0.00 0.00
TERRENO NORMAL_x000D_
1.3.1.15.4.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 24.84 0.00 0.00
D=7KM_x000D_
1.3.1.15.4.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 2.16 0.00 0.00
CONTENCION
1.3.1.15.4.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 55.87 0.00 0.00
1.3.1.15.4.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 30.96 0.00 0.00
1.3.1.15.4.9 CURADO CON AGUA m2 18.33 0.00 0.00
AVANCE MENSUAL TOTAL
PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MES
ANT. Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT CANT.
1.3.1.15.4.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 9.50 0.00 0.00
1.3.1.15.4.11 TUBERIA PVC SAL DE Ø 2" _x000D_ m 2.00 0.00 0.00
1.3.1.15.4.12 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 0.81 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.1.15.4.13 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 0.81 0.00 0.00
DRENAJE TRANSVERSAL
1.3.1.15.4.14 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 9.30 0.00 0.00
1.3.1.15.5 MUROS DE CONCRETO CICLOPEO TIPO MC-08 TRAMO A_x000D_ 0.00 0.00
1.3.1.15.5.1 LIMPIEZA DEL TERRENO MANUAL m2 131.20 0.00 0.00
1.3.1.15.5.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 130.24 0.00 0.00
CONSTRUCCION _x000D_
1.3.1.15.5.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 130.24 0.00 0.00
MURO _x000D_
1.3.1.15.5.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 130.24 0.00 0.00
TERRENO NORMAL_x000D_
1.3.1.15.5.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 149.78 0.00 0.00
D=7KM_x000D_
1.3.1.15.5.6 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 13.02 0.00 0.00
CONTENCION
1.3.1.15.5.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 317.12 0.00 0.00
1.3.1.15.5.8 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 137.57 0.00 0.00
1.3.1.15.5.9 CURADO CON AGUA m2 404.56 0.00 0.00
1.3.1.15.5.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 81.40 0.00 0.00
1.3.1.15.5.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 7.33 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.1.15.5.12 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 100.94 0.00 0.00
1.3.1.15.70 MUROS DE CONCRETO CICLOPEO TIPO MC-09_x000D_ 0.00 0.00
1.3.1.15.71 LIMPIEZA DEL TERRENO MANUAL m2 46.00 0.00 0.00
1.3.1.15.72 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 35.20 0.00 0.00
CONSTRUCCION _x000D_
1.3.1.15.73 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 28.16 0.00 0.00
MURO _x000D_
1.3.1.15.74 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 35.20 0.00 0.00
TERRENO NORMAL_x000D_
1.3.1.15.75 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 32.38 0.00 0.00
D=7KM_x000D_
1.3.1.15.76 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 3.52 0.00 0.00
CONTENCION
1.3.1.15.77 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 92.40 0.00 0.00
1.3.1.15.78 CONCRETO f'c= 175 kg/cm2 + 30%PG_x000D_ m3 38.28 0.00 0.00
1.3.1.15.79 CURADO CON AGUA m2 95.04 0.00 0.00
1.3.1.15.80 TUBERIA PVC SAL DE Ø 8" CRIBADO m 23.00 0.00 0.00
1.3.1.15.81 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 1.98 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.1.15.82 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 24.20 0.00 0.00
1.3.2 MUROS DE CONCRETO ARMADO 0.00 0.00
1.3.2.14. MUROS DE CONCRETO ARMADO TIPO MC 01 TRAMO A 0.00 0.00
1.3.2.14.1 LIMPIEZA DEL TERRENO MANUAL m2 13.60 0.00 0.00
1.3.2.14.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 19.04 0.00 0.00
CONSTRUCCION _x000D_
1.3.2.14.3 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 21.90 0.00 0.00
MURO _x000D_
1.3.2.14.4 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 21.90 0.00 0.00
D=7KM_x000D_
1.3.2.14.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 1.36 0.00 0.00
CONTENCION
1.3.2.14.6 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 739.14 0.00 0.00
1.3.2.14.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 43.30 0.00 0.00
1.3.2.14.8 CONCRETO f'c=210 kg/cm2 m3 12.24 0.00 0.00
1.3.2.14.9 CURADO CON AGUA m2 43.60 0.00 0.00
1.3.2.14.10 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE CONTRUCCION m 5.20 0.00 0.00
EN LOSA_x000D_
1.3.2.14.11 TUBERIA PVC SAL DE Ø 8" CRIBADO m 8.50 0.00 0.00
1.3.2.14.12 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 0.72 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.2.14.13 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 21.44 0.00 0.00
1.3.2.15 MUROS DE CONCRETO ARMADO TIPO MC 01 TRAMO B 0.00 0.00
1.3.2.15.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 38.40 0.00 0.00
CONSTRUCCION _x000D_
AVANCE MENSUAL TOTAL
PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MES
ANT. Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT CANT.
1.3.2.15.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 57.60 0.00 0.00
MURO _x000D_
1.3.2.15.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 66.24 0.00 0.00
D=7KM_x000D_
1.3.2.15.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 54.00 0.00 0.00
CONTENCION
1.3.2.15.5 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 2,042.19 0.00 0.00
1.3.2.15.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 121.00 0.00 0.00
1.3.2.15.7 CONCRETO f'c=210 kg/cm2 m3 40.00 0.00 0.00
1.3.2.15.8 CURADO CON AGUA m2 61.60 0.00 0.00
1.3.2.15.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE CONTRUCCION m 14.80 0.00 0.00
EN LOSA_x000D_
1.3.2.15.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 16.50 0.00 0.00
1.3.2.15.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 1.44 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.2.15.12 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 36.32 0.00 0.00
1.3.2.16 MUROS DE CONCRETO ARMADO TIPO MC 02 TRAMO A 0.00 0.00
1.3.2.16.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 76.50 0.00 0.00
CONSTRUCCION _x000D_
1.3.2.16.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 191.25 0.00 0.00
MURO _x000D_
1.3.2.16.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 219.94 0.00 0.00
D=7KM_x000D_
1.3.2.16.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 7.56 0.00 0.00
CONTENCION
1.3.2.16.5 ACERO DE REFUERZO fy=4,200 kg/cm2 PARA EL MURO DE kg 10,987.23 0.00 0.00
CONTENCION
1.3.2.16.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 459.29 0.00 0.00
1.3.2.16.7 CONCRETO f'c=210 kg/cm2 PARA EL MURO DE CONTENCION m3 142.41 0.00 0.00
1.3.2.16.8 CURADO CON AGUA m2 475.00 0.00 0.00
1.3.2.16.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE CONTRUCCION m 41.50 0.00 0.00
EN LOSA_x000D_
1.3.2.16.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 17.50 0.00 0.00
1.3.2.16.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 1.58 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.2.16.12 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 204.68 0.00 0.00
1.3.2.17 MUROS DE CONCRETO ARMADO TIPO MC 02 TRAMO B 0.00 0.00
1.3.2.17.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 31.50 0.00 0.00
CONSTRUCCION _x000D_
1.3.2.17.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 22.14 0.00 0.00
MURO _x000D_
1.3.2.17.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 25.46 0.00 0.00
D=7KM_x000D_
1.3.2.17.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 3.69 0.00 0.00
CONTENCION
1.3.2.17.5 ACERO DE REFUERZO fy=4,200 kg/cm2 PARA EL MURO DE kg 2,221.72 0.00 0.00
CONTENCION
1.3.2.17.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 75.60 0.00 0.00
1.3.2.17.7 CONCRETO f'c=210 kg/cm2 PARA EL MURO DE CONTENCION m3 39.70 0.00 0.00
1.3.2.17.8 CURADO CON AGUA m2 99.90 0.00 0.00
1.3.2.17.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE CONTRUCCION m 10.80 0.00 0.00
EN LOSA_x000D_
1.3.2.17.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 9.00 0.00 0.00
1.3.2.17.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 31.50 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.2.17.12 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 70.20 0.00 0.00
1.3.2.18 MUROS DE CONCRETO ARMADO TIPO MC-06 0.00 0.00
1.3.2.18.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 199.50 0.00 0.00
CONSTRUCCION _x000D_
1.3.2.18.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 299.25 0.00 0.00
MURO _x000D_
1.3.2.18.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 344.14 0.00 0.00
D=7KM_x000D_
1.3.2.18.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 19.95 0.00 0.00
CONTENCION
1.3.2.18.5 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 11,524.94 0.00 0.00
1.3.2.18.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 572.10 0.00 0.00
1.3.2.18.7 CONCRETO f'c=210 kg/cm2 m3 199.50 0.00 0.00
1.3.2.18.8 CURADO CON AGUA m2 597.55 0.00 0.00
1.3.2.18.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE CONTRUCCION m 93.00 0.00 0.00
EN LOSA_x000D_
1.3.2.18.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 95.50 0.00 0.00
AVANCE MENSUAL TOTAL
PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MES
ANT. Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT CANT.
1.3.2.18.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 8.55 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.2.18.12 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 313.50 0.00 0.00
1.3.2.19. MUROS DE CONCRETO ARMADO TIPO MC 08 TRAMO B 0.00 0.00
1.3.2.19.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 54.60 0.00 0.00
CONSTRUCCION _x000D_
1.3.2.19.2 EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL m3 81.30 0.00 0.00
MURO _x000D_
1.3.2.19.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 94.14 0.00 0.00
D=7KM_x000D_
1.3.2.19.4 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE m3 5.46 0.00 0.00
CONTENCION
1.3.2.19.5 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 3,167.64 0.00 0.00
1.3.2.19.6 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION m2 158.10 0.00 0.00
1.3.2.19.7 CONCRETO f'c=210 kg/cm2 m3 54.60 0.00 0.00
1.3.2.19.8 CURADO CON AGUA m2 163.54 0.00 0.00
1.3.2.19.9 SELLADO DE JUNTA FLEXIBLE TRANSVERSAL DE CONTRUCCION m 24.00 0.00 0.00
EN LOSA_x000D_
1.3.2.19.10 TUBERIA PVC SAL DE Ø 8" CRIBADO m 26.00 0.00 0.00
1.3.2.19.11 RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_ m3 85.80 0.00 0.00
1.3.2.19.12 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE m3 2.34 0.00 0.00
SUBDRENAJE LONGITUDINAL
1.3.2.20. MUROS DE CONTENCION CON GAVIONES_x000D_ 0.00 0.00
1.3.2.20.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 98.00 0.00 0.00
CONSTRUCCION _x000D_
1.3.2.20.2 CORTE DE TERRENO CON MAQUINARIA PARA EL MURO DE m3 304.64 0.00 0.00
GAVIONERIA_x000D_
1.3.2.20.3 EXCAVACION MANUAL DE ZANJAS PARA EL MURO DE m3 4.68 0.00 0.00
CONTENCION _x000D_
1.3.2.20.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN m2 35.20 0.00 0.00
TERRENO NORMAL_x000D_
1.3.2.20.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 344.14 0.00 0.00
D=7KM_x000D_
1.3.2.20.6 APROVICIONAMIENTO Y ARMADO DE GAVIONES DE 1X1X5 und 36.00 0.00 0.00
1.3.2.20.7 APROVICIONAMIENTO Y ARMADO DE GAVIONES DE 1.5X1X5 und 6.00 0.00 0.00
1.3.2.21. LLENADO, PERFILADO Y COCIDO DE TAPAS DE 0.00 0.00
GAVIONES_x000D_
1.3.2.21.1 ACOPIO DE PIEDRA GRANDE_x000D_ m3 225.00 0.00 0.00
1.3.2.21.2 LLENADO DE GAVIONES m3 225.00 0.00 0.00
1.3.2.21.3 PERFILADO Y COCIDO DE LA TAPA DE GAVIONES und 42.00 0.00 0.00
1.3.2.22. BANQUETAS ESTABILIZADORAS 0.00 0.00
1.3.2.22.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 150.00 0.00 0.00
CONSTRUCCION _x000D_
1.3.2.22.2 CORTE DE TERRENO DE FORMA MANUAL PARA LAS BANQUETAS m3 150.00 0.00 0.00
1.3.2.23. FORESTACION DE LAS BANQUETAS ESTABILIZADORAS 0.00 0.00
1.3.2.23.1 EXCAVACION DE HOYOS DE FORMA MANUAL PARA LA m3 7.29 0.00 0.00
PLANTACION DE EUCALIPTO
1.3.2.23.2 PLANTACIONES DE EUCALIPTO und 135.00 0.00 0.00
1.3.7 ESTUDIOS GEOTECNICOS 0.00 0.00
1.3.7.1 ESTUDIO DE MECANICA DE SUELOS und 1.00 0.00 0.00
1.3.7.2 DISEÑO DEL PAVIMENTO und 1.00 0.00 0.00
1.3.7.3 DISEÑO DE MURO DE CONTENCION und 1.00 0.00 0.00
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS


Tuesday, March 1, 2022
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 15.00 UND
Progresiva 0+935 al 0+975km 15.00 15.00
1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 12.00 UND
Progresiva 0+935 al 0+975km 12.00 12.00

Thursday, March 3, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
EXCAVACION MANUAL DE ZANJAS PARA LAS CAJAS DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.3 1.01 M3
Progresiva 0+500 al 0+640km(Lado Izquierdo) 4.00 0.70 0.40 0.90 1.01
NIVELADO Y COMPACTADO LA BASE DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.4 1.12 M2
Progresiva 0+500 al 0+640km(Lado Izquierdo) 4.00 0.70 0.40 1.12
ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL _x000D_
1.1.5.3.2.5 0.60 M3
Progresiva 0+500 al 0+640km(Lado Izquierdo) 4.00 0.15 0.60
1.1.5.3.3 MOVIMIENTOS DE TIERRA PARA LAS CONEXIONES DOMICILIARIAS DE DESAGUE
ENCOFRADO Y DESENCOFRADO DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.3.7 3.55 M2
Progresiva 0+500 al 0+640km(Lado Izquierdo) 4.00 1.48 0.60 3.55
CONCRETO FC=175 KG/CM2 PARA LA CAJA DE REGISTRO DE DESAGGUE_x000D_
1.1.5.3.3.8 0.36 M3
Progresiva 0+500 al 0+640km(Lado Izquierdo) 4.00 1.48 0.10 0.60 0.36

1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE


1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 4.00 UND
Progresiva 0+530 al 0+560km( vereda)(Lado Izquierdo),Progresiva 0+855 al 0+870km(vereda)
(Lado derecho) 4.00 4.00
1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 4.00 UND
Progresiva 0+530 al 0+560km( vereda)(Lado Izquierdo),Progresiva 0+855 al 0+870km(vereda)
(Lado derecho) 4.00 4.00

Friday, March 4, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 1.00 UND
Progresiva 0+575 al 0+590km( vereda)(Lado derecho) 1.00 1.00
1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 1.00 UND
Progresiva 0+575 al 0+590km( vereda)(Lado derecho) 1.00 1.00

Saturday, March 5, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
EXCAVACION MANUAL DE ZANJAS PARA LAS CAJAS DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.3 0.50 M3
Progresiva 0+846 al 0+855km(Lado derecho) 2.00 0.70 0.40 0.90 0.50
NIVELADO Y COMPACTADO LA BASE DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.4 0.56 M2
Progresiva 0+846 al 0+855km(Lado derecho) 2.00 0.70 0.40 0.56
ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL _x000D_
1.1.5.3.2.5 0.15 M3
Progresiva 0+846 al 0+855km(Lado derecho) 2.00 0.08 0.15
1.1.5.3.3 MOVIMIENTOS DE TIERRA PARA LAS CONEXIONES DOMICILIARIAS DE DESAGUE
ENCOFRADO Y DESENCOFRADO DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.3.7 1.78 M2
Progresiva 0+846 al 0+855km(Lado derecho) 2.00 1.48 0.60 1.78
CONCRETO FC=175 KG/CM2 PARA LA CAJA DE REGISTRO DE DESAGGUE_x000D_
1.1.5.3.3.8 0.18 M3
Progresiva 0+846 al 0+855km(Lado derecho) 2.00 1.48 0.10 0.60 0.18

Monday, March 7, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD VOL. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 1.00 UND
Progresiva 0+846 al 0+855km(Lado Izquierdo) 1.00 1.00

1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 1.00 UND


Progresiva 0+846 al 0+855km(Lado Izquierdo) 1.00 1.00

1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 4.02 m2
Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20 2.00 2.01 4.02

1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ Area 6.43 m3


Progresiva 0+977 y 0+971 2.00 2.01 1.60 6.43

1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ Area 4.02 m2


Progresiva 0+977 y 0+971 2.00 2.01 4.02

1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.40 m3
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS


Progresiva 0+977 y 0+971 2.00 2.01 0.10 0.40
1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ m3

1.1.5.5.6 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_ m3

1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES kg

1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ m2

1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON m3

1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON m3

1.1.5.5.11 TAPA DE CONCRETO PARA BUZON und

1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ und

ELIMINACION DE MATERIAL EXCEDENTE PRODUCTO DE LA DEMOLICION DE BUZONES


1.1.5.5.13 CON MAQUINARIA D=7KM m3

Tuesday, March 8, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD VOL. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 5.00 UND
Progresiva 0+500 al 0+531km( vereda)(Lado Izquierdo) 5.00 5.00
1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 5.00 UND
Progresiva 0+500 al 0+531km( vereda)(Lado Izquierdo) 5.00 5.00

1.1.5.5 BUZONES
1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ Area 0.40 m3
Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20 2.00 2.01 0.10 0.40

1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES 86.42 kg


Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20
Acero Horizontal 2.00 20.33 22.77
Acero Vertical y Base 2.00 31.20 63.65

1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ 9.05 m2


Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20 2.00 3.77 1.20 9.05

1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON Area. An m3


Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20(CONCRETO DE LA PARED LATERAL) 2.00 0.88 1.00 1.76

1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area m3
Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20 2.00 1.13 0.20 0.45

Wednesday, March 9, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 4.02 m2
Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 2.01 4.02

1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ Area 6.43 m3


Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 2.01 1.60 6.43

1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ Area 4.02 m2


Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 2.01 4.02

1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.40 m3
Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 2.01 0.10 0.40

1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ Area 0.40 m3


Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 2.01 0.10 0.40

1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES 86.42 kg


Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18
Acero Horizontal 2.00 20.33 22.77
Acero Vertical y Base 2.00 31.20 63.65

1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ 9.05 m2


Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 3.77 1.20 9.05

1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON Area. An 2.11 m3


Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 (CONCRETO DE LA PARED LATERAL) 2.00 0.88 1.20 2.11

1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.45 m3
Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 1.13 0.20 0.45

1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ 2.00 UND


Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 2.00

Thursday, March 10, 2022


MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 4.02 m2
Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 2.01 4.02

1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ Area 6.43 m3


Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 2.01 1.60 6.43

1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ Area 4.02 m2


Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 2.01 4.02

1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.40 m3
Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 2.01 0.10 0.40

1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ Area 0.40 m3


Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 2.01 0.10 0.40

1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES 86.42 kg


Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16
Acero Horizontal 2.00 20.33 22.77
Acero Vertical y Base 2.00 31.20 63.65

1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ 9.05 m2


Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 3.77 1.20 9.05

1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON Area. An 2.11 m3


Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 (CONCRETO DE LA PARED LATERAL) 2.00 0.88 1.20 2.11

1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.45 m3
Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 1.13 0.20 0.45

1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ 2.00 UND


Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 2.00

Friday, March 11, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 2.01 m2
Progresiva 0+800 Buzon Nº 15 1.00 2.01 2.01

1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ Area 3.22 m3


Progresiva 0+800 Buzon Nº 15 1.00 2.01 1.60 3.22

1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ Area 2.01 m2


Progresiva 0+800 Buzon Nº 15 1.00 2.01 2.01

1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.20 m3
Progresiva 0+800 Buzon Nº 15 1.00 2.01 0.10 0.20

1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ Area 0.20 m3


Progresiva 0+800 Buzon Nº 15 1.00 2.01 0.10 0.20

1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES 51.53 kg


Progresiva 0+800 Buzon Nº 15
Acero Horizontal 1.00 20.33 20.33
Acero Vertical y Base 1.00 31.20 31.20

1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ 4.52 m2


Progresiva 0+800 Buzon Nº 15 1.00 3.77 1.20 4.52

1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON Area. An 1.06 m3


Progresiva 0+800 Buzon Nº 15 (CONCRETO DE LA PARED LATERAL) 1.00 0.88 1.20 1.06

1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.23 m3
Progresiva 0+800 Buzon Nº 15 1.00 1.13 0.20 0.23

1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ 1.00 UND


Progresiva 0+800 Buzon Nº 15 1.00 1.00

1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE


1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 3.00 UND
Progresiva 0+450al 0+470km(Lado derecho) 3.00 3.00

1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 6.00 UND


Progresiva 0+450al 0+470km(Lado derecho) 6.00 6.00

Saturday, March 12, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

ITEM HOJA
DESCRIPCION DE SUSTENTO DE METRADOS
CANTIDAD - PARTIDAS NUEVAS REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 2.01 m2
Progresiva 0+800 Buzon Nº 13 1.00 2.01 2.01

1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ Area 3.22 m3


Progresiva 0+800 Buzon Nº 13 1.00 2.01 1.60 3.22

1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ Area 2.01 m2


Progresiva 0+800 Buzon Nº 13 1.00 2.01 2.01

1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.20 m3
Progresiva 0+800 Buzon Nº 13 1.00 2.01 0.10 0.20

1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ Area 0.20 m3


Progresiva 0+800 Buzon Nº 13 1.00 2.01 0.10 0.20

1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES 51.53 kg


Progresiva 0+800 Buzon Nº 13
Acero Horizontal 1.00 20.33 20.33
Acero Vertical y Base 1.00 31.20 31.20

1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ 4.52 m2


Progresiva 0+800 Buzon Nº 13 1.00 3.77 1.20 4.52

1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON Area. An 1.06 m3


Progresiva 0+800 Buzon Nº 15 (CONCRETO DE LA PARED LATERAL) 1.00 0.88 1.20 1.06

1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.23 m3
Progresiva 0+800 Buzon Nº 13 1.00 1.13 0.20 0.23

1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ 1.00 UND


Progresiva 0+800 Buzon Nº 13 1.00 1.00

Monday, March 14, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

SISTEMA DE EVACIACION DE AGUAS PLUVIALES CON TUBERIA 10"_x000D_


1.2.6
1.2.6.1 LIMPIEZA DEL TERRENO DE FORMA MANUAL 4.80 m2
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 4.80

TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_


1.2.6.2 4.80 m2
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 4.80

EXCAVACION DE ZANJAS CON MAQUINARIA PESADA_x000D_


1.2.6.3 9.60 m3
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 2.00 9.60

PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_


1.2.6.4 4.80 m2
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 4.80

CAMA DE APOYO DE TUBERIA, E=0.10 M CON MATERIAL SELECCIONADA _x000D_


1.2.6.6 0.48 m3
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 0.10 0.48

1.2.6.7 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 10" 6.00 m


Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 6.00

RELLENADO Y COMPACTADO CON MATERIAL SELECCIONADO_x000D_


1.2.6.8 1.92 m3
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 0.40 1.92

RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_


1.2.6.9 7.68 m3
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 1.60 7.68

Tuesday, March 15, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 1.00 UND
Progresiva 0+446 al 0+464km(Lado Izquiero) 1.00 1.00

1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 1.00 UND


Progresiva 0+446 al 0+464km(Lado Izquiero) 1.00 1.00

1.1.5.3.2 CAJAS DE REGISTRO


EXCAVACION MANUAL DE ZANJAS PARA LAS CAJAS DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.3 0.76 M3
Progresiva 0+750 al 0+780km( Lado derecho) 3.00 0.70 0.40 0.90 0.76

NIVELADO Y COMPACTADO LA BASE DE LA CAJA DE REGISTRO DE DESAGUE_x000D_


1.1.5.3.2.4 0.84 M2
Progresiva 0+750 al 0+780km( Lado derecho) 3.00 0.70 0.40 0.84

ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL _x000D_


1.1.5.3.2.5 0.34 M3
Progresiva 0+750 al 0+780km( Lado derecho) 3.00 0.11 0.34

1.1.5.3.3 MOVIMIENTOS DE TIERRA PARA LAS CONEXIONES DOMICILIARIAS DE DESAGUE


MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS

1.1.5.3.3.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ 7.20 m2


Progresiva 0+750 al 0+780km( Lado derecho) 1.00 12.00 0.60 7.20

1.1.5.3.3.2 EXCAVACION MANUAL DE ZANJAS PARA LAS CONEXIONES DOMICILIARIAS EN TERRENO NORMAL 8.64 m3
Progresiva 0+750 al 0+780km( Lado derecho) 1.00 12.00 0.60 1.20 8.64

1.1.5.3.3.3 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ 0.72 m3
Progresiva 0+750 al 0+780km( Lado derecho) 1.00 12.00 0.60 0.10 0.72

1.1.5.3.3.4 RELLENADO CON MATERIAL SELECCIONADA E=0.2M_x000D_ 1.44 m3


Progresiva 0+750 al 0+780km( Lado derecho) 1.00 12.00 0.60 0.20 1.44

1.1.5.3.3.5 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO 6.48 m3


Progresiva 0+750 al 0+780km( Lado derecho) 1.00 12.00 0.60 0.90 6.48

1.1.5.3.3.6 ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL _x000D_ 2.16 m3


Progresiva 0+750 al 0+780km( Lado derecho) 1.00 2.16

ENCOFRADO Y DESENCOFRADO DE LA CAJA DE REGISTRO DE DESAGUE_x000D_


1.1.5.3.3.7 2.66 M2
Progresiva 0+750 al 0+780km( Lado derecho) 3.00 1.48 0.6 2.66

CONCRETO FC=175 KG/CM2 PARA LA CAJA DE REGISTRO DE DESAGGUE_x000D_


1.1.5.3.3.8 0.27 M3
Progresiva 0+750 al 0+780km( Lado derecho) 3.00 1.48 0.10 0.6 0.27

SISTEMA DE EVACIACION DE AGUAS PLUVIALES CON TUBERIA 10"_x000D_


1.2.6
1.2.6.1 LIMPIEZA DEL TERRENO DE FORMA MANUAL 4.80 m2 m2
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 4.80

TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_


1.2.6.2 4.80 m2
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 4.80

EXCAVACION DE ZANJAS CON MAQUINARIA PESADA_x000D_


1.2.6.3 9.60 m3
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 2.00 9.60

PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_


1.2.6.4 4.80 m2
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 4.80

CAMA DE APOYO DE TUBERIA, E=0.10 M CON MATERIAL SELECCIONADA _x000D_


1.2.6.6 0.48 m3
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 0.10 0.48

1.2.6.7 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 10" 6.00 ml


Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 6.00

RELLENADO Y COMPACTADO CON MATERIAL SELECCIONADO_x000D_


1.2.6.8 1.92 m3
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 0.40 1.92

RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_


1.2.6.9 7.68 m3
Progresiva 0+978km (Lado Izquierdo) 1.00 6.00 0.80 1.60 7.68

Wednesday, March 16, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 2.00 UND
Progresiva 0+808 al 0+827km(Lado Derecho) 2.00 2.00

1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 2.00 UND


Progresiva 0+808 al 0+827km(Lado Derecho) 2.00 2.00

1.1.5.3.2 CAJAS DE REGISTRO


EXCAVACION MANUAL DE ZANJAS PARA LAS CAJAS DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.3 1.01 M3
Progresiva 0+750 al 0+780km( Lado derecho) 4.00 0.70 0.40 0.90 1.01

NIVELADO Y COMPACTADO LA BASE DE LA CAJA DE REGISTRO DE DESAGUE_x000D_


1.1.5.3.2.4 1.12 M2
Progresiva 0+750 al 0+780km( Lado derecho) 4.00 0.70 0.40 1.12

ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL _x000D_


1.1.5.3.2.5 0.60 M3
Progresiva 0+750 al 0+780km( Lado derecho) 4.00 0.15 0.60

1.1.5.3.3 MOVIMIENTOS DE TIERRA PARA LAS CONEXIONES DOMICILIARIAS DE DESAGUE


ENCOFRADO Y DESENCOFRADO DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.3.7 3.55 M2
Progresiva 0+750 al 0+780km( Lado derecho) 4.00 1.48 0.6 3.55

CONCRETO FC=175 KG/CM2 PARA LA CAJA DE REGISTRO DE DESAGGUE_x000D_


1.1.5.3.3.8 0.36 M3
Progresiva 0+750 al 0+780km( Lado derecho) 4.00 1.48 0.10 0.6 0.36

1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 2.01 m2
Progresiva 0+790 Buzon Nº 14 1.00 2.01 2.01

1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ Area 3.22 m3


Progresiva 0+790 Buzon Nº 14 1.00 2.01 1.60 3.22

1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ Area 2.01 m2


Progresiva 0+790 Buzon Nº 14 1.00 2.01 2.01
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS

1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.20 m3
Progresiva 0+790 Buzon Nº 14 1.00 2.01 0.10 0.20

1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ Area 0.20 m3


Progresiva 0+790 Buzon Nº 14 1.00 2.01 0.10 0.20

1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES 51.53 kg


Progresiva 0+790 Buzon Nº 14
Acero Horizontal 1.00 20.33 20.33
Acero Vertical y Base 1.00 31.20 31.20

1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ 4.52 m2


Progresiva 0+790 Buzon Nº 14 1.00 3.77 1.20 4.52

1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON Area. An 1.85 m3


Progresiva 0+790 Buzon Nº 15 (CONCRETO DE LA PARED LATERAL) 1.00 0.88 1.20 1.06
Progresiva 0+977 Buzon Nº 20 1.00 0.88 0.90 0.79

1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.23 m3
Progresiva 0+790 Buzon Nº 14 1.00 1.13 0.20 0.23
1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ 1.00 UND
Progresiva 0+790 Buzon Nº 14 1.00 1.00

Thursday, March 17, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 2.00 UND
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS


Progresiva 0+372 al 0+402km(Lado Izquierdo) 2.00 2.00

1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 2.01 m2
Progresiva 0+750 Buzon Nº 12 1.00 2.01 2.01

1.1.5.5.2 EXCAVACION MANUAL DE ZANJAS PARA BUZON_x000D_ Area 2.65 m3


Progresiva 0+750 Buzon Nº 12 1.00 2.01 1.32 2.65

1.1.5.5.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ Area 2.01 m2


Progresiva 0+750 Buzon Nº 12 1.00 2.01 2.01

1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.20 m3
Progresiva 0+750 Buzon Nº 12 1.00 2.01 0.10 0.20

1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ Area 0.20 m3


Progresiva 0+750 Buzon Nº 12 1.00 2.01 0.10 0.20

1.1.5.5.7 ACERO DE REFUERZO fy=4200 Kg/cm2 PARA BUZONES 51.53 kg


Progresiva 0+750 Buzon Nº 12
Acero Horizontal 1.00 20.33 20.33
Acero Vertical y Base 1.00 31.20 31.20

1.1.5.5.8 ENCOFRADO Y DESENCOFRADO DE BUZONES _x000D_ 4.52 m2


Progresiva 0+750 Buzon Nº 12 1.00 3.77 1.20 4.52

1.1.5.5.9 CONCRETO FC=210 KG/CM2 PARA BUZON Area. An 1.06 m3


Progresiva 0+750 Buzon Nº 12 (CONCRETO DE LA PARED LATERAL) 1.00 0.88 1.20 1.06

1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.23 m3
Progresiva 0+750 Buzon Nº 12 1.00 1.13 0.20 0.23

Friday, March 18, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 6.00 UND
Progresiva 0+372 al 0+402(Lado Izquierdo) 6.00 6.00

1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 6.00 UND


Progresiva 0+372 al 0+402(Lado Izquierdo) 6.00 6.00

Monday, March 21, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

1.1.5.3.2 CAJAS DE REGISTRO


EXCAVACION MANUAL DE ZANJAS PARA LAS CAJAS DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.3 0.50 M3
Progresiva 0+340 al 0+370km(Lado derecho) 2.00 0.70 0.40 0.90 0.50
NIVELADO Y COMPACTADO LA BASE DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.4 0.56 M2
Progresiva 0+340 al 0+930km(Lado derecho) 2.00 0.70 0.40 0.56
ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL _x000D_
1.1.5.3.2.5 0.15 M3
Progresiva 0+340 al 0+370km(Lado derecho) 2.00 0.08 0.15

1.1.5.3.3 MOVIMIENTOS DE TIERRA PARA LAS CONEXIONES DOMICILIARIAS DE DESAGUE


ENCOFRADO Y DESENCOFRADO DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.3.7 1.78 M2
Progresiva 0+340 al 0+370km(Lado derecho) 2.00 1.48 0.6 1.78
CONCRETO FC=175 KG/CM2 PARA LA CAJA DE REGISTRO DE DESAGGUE_x000D_
1.1.5.3.3.8 0.18 M3
Progresiva 0+340 al 0+370km(Lado derecho) 2.00 1.48 0.10 0.6 0.18

Tuesday, March 22, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
EXCAVACION MANUAL DE ZANJAS PARA LAS CAJAS DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.3 0.50 M3
Progresiva 0+340 al 0+400(Lado Derecho) 2.00 0.70 0.40 0.90 0.50
NIVELADO Y COMPACTADO LA BASE DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.2.4 0.56 M2
Progresiva 0+340 al 0+400(Lado Derecho) 2.00 0.70 0.40 0.56
ELIMINACION DE MATERIAL EXCEDENTE DE FORMA MANUAL _x000D_
1.1.5.3.2.5 0.15 M3
Progresiva 0+340 al 0+400(Lado Derecho) 2.00 0.08 0.15

1.1.5.3.3 MOVIMIENTOS DE TIERRA PARA LAS CONEXIONES DOMICILIARIAS DE DESAGUE


ENCOFRADO Y DESENCOFRADO DE LA CAJA DE REGISTRO DE DESAGUE_x000D_
1.1.5.3.3.7 1.78 M2
Progresiva 0+340 al 0+400(Lado Derecho) 2.00 1.48 0.6 1.78
CONCRETO FC=175 KG/CM2 PARA LA CAJA DE REGISTRO DE DESAGGUE_x000D_
1.1.5.3.3.8 0.18 M3
Progresiva 0+340 al 0+400(Lado Derecho) 2.00 1.48 0.10 0.6 0.18
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 3.00 UND
Progresiva 0+340 al 0+400(Lado Derecho) 3.00 3.00
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS

1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 3.00 UND


Progresiva 0+340 al 0+400(Lado Derecho) 3.00 3.00

Wednesday, March 23, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 2.00 UND
Progresiva 0+372 al 0+402(Lado derecho) 2.00 2.00

1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 2.00 UND


Progresiva 0+372 al 0+402(Lado derecho) 2.00 2.00

Friday, March 25, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.10 CAJA DE REGISTRO DE AGUA 30X30CM 3.00 UND
Progresiva 0+430, 0+630, 0+515, al 0+655(Lado Izquierda) 3.00 3.00

1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 3.00 UND


Progresiva 0+430, 0+630, 0+515, al 0+655(Lado Izquierda) 3.00 3.00

Saturday, March 26, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

Monday, March 28, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

Tuesday, March 29, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 3.00 UND
Progresiva 0+390 al 0+402(Lado derecho) 3.00 3.00

Wednesday, March 30, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.5 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" C-10 _x000D_ 1.00 UND
Progresiva 0+335 Lado drecho 1.00 1.00

1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 1.00 UND


Progresiva 0+390 al 0+402(Lado derecho) 1.00 1.00

Thursday, March 31, 2022


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.9 INSTALACIONES DOMICILIRIAS DE AGUA POTABLE
1.1.5.9.11 TAPA DE METAL PARA REGISTRO DE 0.25 X 0.60 m 5.00 UND
Progresiva 0+334 al 0+340(Lado derecho) 5.00 5.00
Progresiva 0+499 al 0+506(Lado derecho)
Progresiva 0+592 al 0+595(Lado derecho)
Página 146

FORMATO - 13

22.4.- VALORIZACION POR PARTIDAS NUEVAS 02 MES DE FEBRERO


OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1 OBRA VIAL_x000D_

1.3 OBRAS DE ARTE Y SEÑALIZACION


1.3.1.15 MUROS DE CONCRETO CICLOPLEO MC=10
1.3.1.15.7 MUROS CONCRETO CICLOPEO MC.-10 TRAMO ESCALINATA
1.3.1.15.7.1 LIMPIEZA DEL TERRENO MANUAL m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRU m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.3 EXCVACION DE ZANJA CON MAQUINARIA PARA BASE DE m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.4 PERFILADO, NIVELADP Y COMACTACION MANUAL, EN TE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARI m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.6 CONCRETO F'C=100KG/CM2 PARA EL SOLADO DE MURO DE m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.7 ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCION m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.8 CONCRETO F'C=175 KG/CM2 +30% PG m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.9 CURADO DE AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

1.3.1.15.7.10 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LAS ZANJ m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
RELLENADO Y COMPACTADO CON MATERIAL PROPIO
1.3.1.15.7.11 m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
5.4.- METRADOS DIARIOS POR PARTIDAS NUEVAS 02 DE OBRA

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO –
DEPARTAMENTO DE CUSCO”
INFORME TECNICO MENSUAL DE FEBRERO DEL 2023

AVANCE MENSUAL TOTAL


PRESUPUESTO BASE PROGRAMADO SALD.
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 01 02 03 MES
ANT. Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
DESCRIPCION DE PARTIDA UND CANT CANT.

### 1 OBRA VIAL_x000D_ 0.00


1.3 OBRAS DE ARTE Y SEÑALIZACION 0.00
1.3.1.15 MUROS DE CONCRETO CICLOPLEO MC=10 0.00
1.3.1.15.7 MUROS CONCRETO CICLOPEO MC.-10 TRAMO ESCALINATA 0.00
1.3.1.15.7.1 LIMPIEZA DEL TERRENO MANUAL m2 0.00 0.00 0.00
1.3.1.15.7.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m2 0.00 0.00 0.00
CONSTRUCCION
1.3.1.15.7.3 EXCVACION DE ZANJA CON MAQUINARIA PARA BASE DE MURO m3 0.00 0.00 0.00
1.3.1.15.7.4 PERFILADO, NIVELADP Y COMACTACION MANUAL, EN TERRENO m2 0.00 0.00 0.00
NORMAL
1.3.1.15.7.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 0.00 0.00 0.00
D=7KM
1.3.1.15.7.6 CONCRETO F'C=100KG/CM2 PARA EL SOLADO DE MURO DE m3 0.00 0.00 0.00
CONTENCION
1.3.1.15.7.7 ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCION m2 0.00 0.00 0.00
1.3.1.15.7.8 CONCRETO F'C=175 KG/CM2 +30% PG m3 0.00 0.00 0.00
1.3.1.15.7.9 CURADO DE AGUA m2 0.00 0.00 0.00
1.3.1.15.7.10 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LAS ZANJAS m3 0.00 0.00 0.00
DE SUBDRENAJE LONGITUDINAL
1.3.1.15.7.11 RELLENADO Y COMPACTADO CON MATERIAL PROPIO m3 0.00 0.00 0.00
MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO
GERENCIA DE INFRAESTRUCTURA
27. PLANILLA DE METRADOS
MES DE FEBRERO
#REF!

Nº medidas Total
Descripcion partida unidad ubicación Nº veces Volumen
elementos Largo Ancho Altura Area Metrado
ITEM.
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! obra 0.35
1
#REF! #REF!
#REF! #REF! #REF! area total 528.00
obra 1 5.5 96 528.00
#REF! #REF! #REF! area total 528.00
obra 1 5.5 96 528.00
#REF! #REF!
#REF! #REF! #REF! area total 228.00
obra 1 6 38 228.00
#REF! #REF! #REF! area total 228.00
obra 1 6 38 228.00
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS 02


Thursday, December 2, 2021

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
LIMPIEZA DEL TERRENO MANUAL 11.84 M2
Conchupata baja prog. 0+070 14.80 0.80 11.84
TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_
11.84 M2
Conchupata baja prog. 0+070 14.80 0.80 11.84
EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL MURO _x000D_
1.3.1.15.2.3 15.98 M3
Conchupata baja prog. 0+070 1.00 14.80 0.40 2.70 15.98
1.3.1.15.1.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION 40.40 M2
graderia conchupata baja prog. 0+070 al 0+094 1.00 14.80 2.73 40.40
CONCRETO f'c= 175kg/cm2 + 30%PG_x000D_
1.3.1.15.1.8 4.44 M3
graderia conchupata baja prog. 0+080 al 0+094 1.00 14.80 0.20 1.50 4.44
1.3.1.15.1.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ 14.80 M2
graderia conchupata baja prog. 0+070 al 0+094 1.00 14.80 1.00 14.80
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_
1.3.1.15.1.5 18.70 M3
graderia conchupata baja prog. 0+080 al 0+094 1.00 14.80 0.40 2.70 18.70

Friday, December 3, 2021

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
1.3.1.15.1.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION 27.30 M2
graderia conchupata baja prog. 0+850 al 0+900 1.00 10.50 2.60 27.3
1.3.1.15.1.1 LIMPIEZA DEL TERRENO MANUAL 6.36 M2

graderia conchupata baja prog. 0+850 al 0+900 1.00 10.60 0.60 6.36
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_
1.3.1.15.1.5 0.99 M3

graderia conchupata baja prog. 0+850 al 0+900 1.00 10.60 0.40 0.20 0.99216

1.3.1.15.1.9 CURADO CON AGUA 33.15 M2


Conchupata baja prog. 0+105 al 0+094 1.00 14.80 2.24 33.152

Thursday, December 9, 2021

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
1.3.1.15.1.1 LIMPIEZA DEL TERRENO MANUAL 8.40 M2
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.80 8.40
TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_
1.3.1.15.2.2 6.36 M2
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 0.60 6.36
EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL MURO _x000D_
1.3.1.15.2.3 8.48 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 0.40 2.00 8.48
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_
1.3.1.15.2.5 8.93 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 0.40 1.80 8.93

Friday, December 10, 2021

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_
1.3.1.15.1.4 10.60 M2
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 1.00 10.6
CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE CONTENCION
1.3.1.15.1.6 2.54 M3
Conchupata baja prog. 0+105 al 0+094 1.00 14.84 1.00 0.10 1.484
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 1.00 0.10 1.06
1.3.1.15.1.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION 21.42 M2
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 2.02 21.41624
CONCRETO f'c= 175kg/cm2 + 30%PG_x000D_
1.3.1.15.1.8 5.04 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.60 0.80 5.04
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_
1.3.1.15.1.5 13.44 M3
Conchupata baja prog. 0+105 al 0+094 4.00 10.50 0.80 0.40 13.44

Saturday, December 11, 2021

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
CONCRETO f'c= 175kg/cm2 + 30%PG_x000D_
1.3.1.15.1.8 9.45 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.60 1.50 9.45
1.3.1.15.1.11 COLOCADO DE PIEDRA CHANCADA DE 1/2" PARA LA ZANJAS DE SUBDRENAJE LONGITUDINAL 1.68 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.20 0.80 1.68
Sunday, December 12, 2021

DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA

Monday, December 13, 2021


MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

HOJA DE SUSTENTO DE METRADOS - PARTIDAS NUEVAS 02


DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
CONCRETO f'c= 175kg/cm2 + 30%PG_x000D_
1.3.1.15.7.8 5.53 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.40 1.32 5.53
1.3.1.15.7.11 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LA ZANJAS DE SUBDRENAJE LONGITUDINAL 3.40 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.40 0.81 3.40
RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_
1.3.1.15.7.12 1.68 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.20 0.80 1.68
TUBERIA PVC SAL DE Ø 8" CRIBADO
1.3.1.15.1.10 3.00 M
Conchupata baja prog. 0+105 al 0+094 1.00 3.00 3.00

1.3.1.15.1.9 CURADO CON AGUA 28.67 M2


Conchupata baja prog. 0+105 al 0+094 1.00 10.50 2.73 28.67
RELLENADO Y COMPACTADO CON MATERIAL PROPIO_x000D_
1.3.1.15.1.12 7.15 M3
Conchupata baja prog. 0+105 al 0+094 1.00 14.80 0.20 1.70 5.03
Conchupata baja prog. 0+105 al 0+095 1.00 10.60 0.20 1.00 2.12
Página 151

FORMATO - 13

22.4.- VALORIZACION POR PARTIDAS NUEVAS 02 MES DE FEBRERO


OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1 OBRA VIAL
1.1 ADECUADA INFRAESTRUCTURA VEHICULAR Y PEATONAL -
1.1.9 SUPERFICIE DE RODADURA_x000D_
1.1.9.11 CONCRETO PREMEZCLADO f'c=280 kg/cm2 EN OBRA SEGUN m3 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
Página 152

FORMATO - 13

22.5.- VALORIZACION DE DEDUCTIVO DE OBRA MES DE FEBRERO


OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE
CUSCO – DEPARTAMENTO DE CUSCO”
SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1 OBRA VIAL
1.1 ADECUADA INFRAESTRUCTURA VEHICULAR Y PEATONAL 0.00 -
1.1.3 SEGURIDAD Y SALUD -
1.1.5 TRABAJOS COMPLEMENTARIOS
1.1.5.2 BUZONES (MODIFICACION DE NIVELES)
1.1.5.2.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.2.2 ENCOFRADO Y DESENCOFRADO METALICO EN m² 69.61 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.2.3 ACERO DE REFUERZO f'y= 4200 Kg/cm2 kg 6.10 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.2.4 CONCRETO f'c= 210 kg/cm2, EN BUZONES m³ 646.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.2.5 TAPA PARA BUZON PREFABRICADA und 141.60 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.5.2.6 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.6 MOVIMIENTO DE TIERRAS
1.1.6.1 TALUD
1.1.6.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m² 2.88 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.6.1.2 RAYADO DE TALUD m 28.64 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.6.1.3 CORTE DE TERRENO A NIVEL DE SUB RASANTE E m³ 5.62 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.6.1.4 CORTE DE TERRENO A NIVEL DE SUB RASANTE m³ 6.12 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.6.1.5 RELLENO Y COMPACTADO MANUAL CON MATER m³ 42.20 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.6.1.6 PEINADO DE TALUD m² 5.77 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.6.1.7 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.7 MEJORAMIENTO DE SUB-RASANTE
1.1.7.1 EXTRACCION Y APILAMIENTO MATERIAL DE P m³ 48.40 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.7.2 PERFILADO Y COMPACTADO DE SUB RASANTE m² 1.41 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.7.3 RIEGO DE SUBRASANTE m² 2.21 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.9 SUPERFICIE DE RODADURA
1.1.9.4 CONCRETO, f'c= 210 kg/cm2, EN SUPERFICIE DE m³ 646.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.10 DOWELLS O JUNTAS
1.1.10.1 ACERO DE 1" PARA JUNTAS LONGITUDINALES D kg 6.61 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.10.2 ACERO DE 3/4" PARA JUNTAS LONGITUDINALES kg 6.01 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
Página 153

AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.1.10.3 ACERO DE 1/2" PARA JUNTAS TRANSVERSALES kg 6.01 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11 SARDINELES PARA JARDINERIA
1.1.11.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.2 EXCAVACION MANUAL DE ZANJAS m³ 54.09 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.3 ACARREO DE MATERIAL EXCEDENTE (d=40m) m³ 22.54 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.4 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.5 ENCOFRADO Y DESENCOFRADO m² 59.8 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.6 CONCRETO f'c= 175 kg/cm2, EN SADINELES m³ 530.49 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.7 SELLADO DE JUNTAS m 9.70 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.8 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.18 PLAN DE MONITOREO ARQUEOLOGICO
1.1.18.1 ELABORACION DEL PLAN DE PLAN DE MONITO und 20000.00 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2 SISTEMA DE EVACUACION DE AGUAS PLUVIALES
1.2.1 CUNETA LATERAL
1.2.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.1.2 ENCOFRADO Y DESENCOFRADO m² 59.80 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.1.3 CONCRETO f'c= 210 kg/cm2, EN CUNETAS m³ 646.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.1.4 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.1.5 JUNTAS ASFALTICAS DE 1" x 2" m 9.39 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5 CUNETAS DE CORONACION
1.2.5.1 LIMPIEZA DEL TERRENO MANUAL m² 2.71 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.2 ACARREO DE MATERIAL EXCEDENTE (d=40m) m³ 22.54 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.3 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.4 NIVELACION INT. Y APISONADO MANUAL m² 11.26 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.5 ENCOFRADO Y DESENCOFRADO m² 59.80 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.6 CONCRETO f'c= 210 kg/cm2, EN CUNETAS m³ 646.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.7 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.8 SELLADO DE JUNTAS m 9.70 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.9 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.10 EXCAVACION MANUAL DE ZANJAS m³ 54.09 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3 OBRAS DE ARTE Y SEÑALIZACION
1.3.1 MUROS DE CONCRETO CICLOPEO
1.3.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.2 EXCAVACION MANUAL DE ZANJAS m³ 54.09 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.3 ACARREO DE MATERIAL EXCEDENTE (d=40m) m³ 22.54 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.4 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.5 ENTIBADO EN ZONAS DE CORTE m² 34.14 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.6 SOLADO H=0.10 M,MEZCLA 1:12, C:H m² 39.77 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.7 ENCOFRADO Y DESENCOFRADO m² 59.80 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.8 CONCRETO f'c= 175 kg/cm2 + 30%PM m³ 480.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
Página 154

AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.3.1.9 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.10 CAMA DE APOYO m³ 176.94 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.11 TUBERIA HDPE DE Ø 4", CON GEOCOMPUESTO m 34.98 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.12 COLOCADO DE MATERIAL DE FILTRO (ZANJAS D m 22.66 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.13 RELLENO Y COMPACTADO CON MATERIAL DE m³ 86.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.14 EMBOQUILLADO DE PIEDRA CON CONCRETO f'c= m² 86.28 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2 MUROS DE CONCRETO ARMADO
1.3.2.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.2 EXCAVACION MANUAL DE ZANJAS m³ 54.09 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.3 ACARREO DE MATERIAL EXCEDENTE (d=40m) m³ 22.54 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.4 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.5 ENTIBADO EN ZONAS DE CORTE m² 34.14 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.6 SOLADO H=0.10 M,MEZCLA 1:12, C:H m² 39.77 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.7 ENCOFRADO Y DESENCOFRADO m² 59.80 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.8 CONCRETO f'c= 210 kg/cm2, EN MUROS DE CONTE m³ 646.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.9 ACERO DE REFUERZO f'y= 4200 Kg/cm2 kg 6.1 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.10 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.11 RELLENO Y COMPACTADO CON MATERIAL DE m³ 86.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.12 CORTE DE JUNTAS, EN MUROS m 7.1 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.13 SELLADO DE JUNTAS m 9.70 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
- 0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
Página 155

FORMATO - 13

22.5.- VALORIZACION DE DEDUCTIVO 03 DE OBRA


OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS

INFORME TECNICO MENSUAL DE FEBRERO DEL 2023 FECHA 3/26/2023


AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO 
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1 OBRA VIAL
1.1 ADECUADA INFRAESTRUCTURA VEHICULAR Y PEATONAL -
1.1.9 SUPERFICIE DE RODADURA_x000D_
1.1.9.9 CONCRETO, f'c= 280 kg/cm2, EN SUPERFICIE DE RODADURA_x000D_
m3 702.26 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!

0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

3.2 CURVA DE AVANCE DE OBRA " S "

OBRA “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”,
y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

EJECUTA : MUNICIPALIDAD DISTRITAL DE SANTIAGO


MODALIDAD EJECUCIÓN PRESUPUESTARIA DIRECTA
ING. RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
ING. INSPECTOR ING. WILBERT RAUL HURTADO TERRAZAS
PRESUPUESTO C.D. S/.1,834,283.19

120.00%

100.00%
CURVA S 100.00%

83.72%
AVANCE PROGRAMADO AVANCE EJECUTADO AVANCE FINANCIERO
80.00%

60.00% 57.26%

40.00% 35.92%

19.73%
20.00%
1.26% 0.00%
0.00% 0.00% 5.92%
3.34%
0.93%
0.00% 0.00% 0.00% 0.00%
0.00%
INICIO DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO

-20.00%

AVANCE PROGRAMADO AVANCE EJECUTADO AVANCE FINANCIERO


AVANCES
VALORIZADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
S/. % S/. % S/. % S/. % S/. % S/. %
INICIO 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
DICIEMBRE 23,116.57 1.26% 23,116.57 1.26% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
ENERO 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
FEBRERO 38,184.61 2.08% 61,301.18 3.34% 16,976.48 0.93% 16,976.48 0.93% 100.00 0.00% 100.00 0.00%
MARZO 47,332.08 2.58% 108,633.26 5.92%
ABRIL 253,203.40 13.80% 361,836.66 19.73%
MAYO 296,994.68 16.19% 658,831.34 35.92%
JUNIO 391,390.86 21.34% 1,050,222.20 57.26%
JULIO 485,374.42 26.46% 1,535,596.62 83.72%
AGOSTO 298,686.57 16.28% 1,834,283.19 100.00%
TOTAL C.D. 1,834,283.19 100.00% 1,834,283.19 100.00% 16,976.46 0.93% 0.00 0.00% 100.00 0.00% 0.00 0.00%

PRESUPUESTO TOTAL 2,199,325.91 SALDO 2,199,325.91


-

MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO


28.- RESUMEN CRONOGRAMA COMPARADO - PROYECTADO VS EJECUTADO
GERENCIA DE INFRAESTRUCTURA CURVA "S" PARA VERIFICACION DE AVANCE FISICO Y FINANCIERO

OBRA: 0054

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑ OZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA PRESENTACIÓN: 26/03/2023

AVANCE FISICO AVANCE FINANCIERO


PROYECTO PRINCIPAL MODIFICACIONES DE OBRA VALORIZACION TOTAL (PRINCIPAL Y MODIFICACIONES) AVANCE FINANCIERO EJECUTADO
AÑO MES DEDUCTIVO VALORIZACION ACUMULADA PROGR.
PROGRAMADO VALORIZACION MENSUAL VALORIZACION ACUMULADA MAYOR MET. OBRA NUEVA TOTAL MODIFICACIONES VALORIZACION MENSUAL PROGRAMADO EJECUTADO EJEC. ACUM
S EJECUTADA ACUM
S/. % % ACUM. S/. % S/. % S/. S/. S/. S/. % S/. % S/. % S/. % S/. %
2017

- 0.00% 0.00% - 0.00% - 0.00% - - 0.00% - 0.00% - Err:509 - Err:509


2019 2018

OCT-DIC Err:509 Err:509 Err:509 - 0.00% - 0.00% - - 0.00% - 0.00% - 0.00% Err:509 Err:509 421,385.54 Err:509

ABRIL Err:509 Err:509 Err:509 16,976.48 0.93% 16,976.48 0.93% - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 987,049.05 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 - Err:509

- Err:509 32,349.80 Err:509

- Err:509 25,700.00 Err:509

- Err:509 - Err:509

- Err:509 648,410.72 Err:509

COSTO DIRECTO 1,834,283.19 - 0.00% - 0.00% - Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 2,114,895.11 Err:509
GASTOS GENERALES 244,100.23 - 0.00% - Err:509 Err:509 Err:509 Err:509
GASTOS DE SUPERVISION 18,500.00 - 0.00% - Err:509 Err:509 Err:509 Err:509
GASTOS EXP. TECNICO 27,490.50 - 0.00% - Err:509 Err:509 Err:509 Err:509
GASTOS DE LIQUIDACION Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
COSTO TOTAL Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 0.00% 2,114,895.11 Err:509

340,000 100% 340,000 100%


320,000
EJECUCION FISICA 90%
320,000 EJECUCION FINANCIERA
90%
300,000 300,000
280,000 80% 280,000 80%
260,000 260,000
240,000 70% 240,000 70%
220,000 220,000
60% 60%
200,000 200,000
180,000 180,000
50% 50%
160,000 160,000
140,000 40% 140,000 40%
120,000 120,000
100,000 30% 100,000 30%
80,000 80,000
20% 20%
60,000 60,000
40,000 10% 40,000 10%
20,000 20,000
0 0% 0 0%
2017 2018 2019 2017 2018 2019

PROGRAMADO ANUAL EJECUTADO VALORIZACION ACUMULADA PROGRAMADA


VALORIZACION ACUMULADA EJECUTADA PROGRAMADO EJECUTADO PROGR. ACUM EJEC. ACUM
MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO 29.- PLANILLA DE TAREO VALORIZADO DEL PERSONAL
GERENCIA DE INFRAESTRUCTURA MES DE FEBRERO

"PROYECTO : MEJORAMIENTO Y TRATAMIENTO DE LA CIRCUNVALACION DE LOS BARRIOS DE KANCHISPUGIO, VALDIVIESO BUENO, VILLA DEL ROSARIO, PIOC, CONCHUPATA ALTA Y BAJA, VIRGEN DEL CARMEN Y
OBRA: CARPAPAMPA, DISTRITO DE PAUCARTAMBO, PROVINCIA DE PAUCARTAMBO CUSCO”

INFORME TÉCNICO MENSUALMES DE FEBRERO

TAREO DE PERSONAL APORTE


TOTAL PAGO MENSUAL DESCUENTOS MONTO TOTAL
APELLIDO APELLIDO FECHA (AFP) (ESSALUD, PAGADO
Nº NOMBRES DNI FECHA NACIM CATEGORIA SEXO SCTR)
PATERNO MATERNO INGRESO DIAS
TAREO DE PERSONAL - GASTOS GENERALES
1 NOHA VALDIVIA LUIS FRANZ 43793058 6/17/1986 RESIDENTE 10/7/2019 M 25 S/. 2,549.47 349.83 242.19 S/. 2,899.30
2 SALAS CONDORI IVAN 46951584 9/14/1991 ASIST_ADM II 10/15/2019 M 16 S/. 1,631.66 223.89 155.00 S/. 1,855.55
3 SULLCA HINOJOSA GRIMALDO 41119838 9/29/1979 MASTRO DE OBRA 10/21/2019 M 11 S/. 795.43 109.15 83.70 S/. 904.58
4 S/. 0.00
PARCIAL S/. 5,659.43
TAREO DE PERSONAL - COSTO DIRECTO
1 QUISPE CEA ARMANDO 45489792 12/7/1988 OFICIAL 10/21/2019 M 11 S/. 0.00
2 PERALTA CHIHUITA CIRILO 45082348 8/1/1985 PEON 10/21/2019 M 11 S/. 0.00
3 MAMANI QUISPE VICENTE 25135684 8/16/1975 PEON 10/21/2019 M 11 S/. 0.00
4 HUAMAN QUISPE RAUL 47054948 3/29/1992 PEON 10/21/2019 M 11 S/. 0.00
5 RAMOS LAURA JAVIER 41084300 12/13/1979 PEON 10/21/2019 M 11 S/. 0.00
6 QUISPE HUILLCA TIMOTEO 44195358 12/19/1980 PEON 10/21/2019 M 11 S/. 0.00
7 PAUCAR QUISPE VICTOR 46982260 8/5/1990 PEON 10/21/2019 M 11 S/. 0.00
8 YAPURA PERALTA REMBER 48387582 9/15/1994 PEON 10/21/2019 M 11 S/. 0.00
9 SEA MAMANI EUSTAQUIO 48615610 7/18/1995 PEON 10/21/2019 M 11 S/. 0.00
10 SEA PERALTA ROMULO 25136088 11/5/1976 PEON 10/21/2019 M 11 S/. 0.00
11 YAPURA MAMANI GRACIANO 25134637 12/27/1971 PEON 10/21/2019 M 11 S/. 0.00
12 QUISPE HUAMAN VICTORIA 80196005 5/25/1972 PEON 10/21/2019 F 11 S/. 0.00
13 PAUCCAR FLORES DILMAR 72034775 8/30/1997 PEON 10/21/2019 M 11 S/. 0.00
14 QUISPE HUAMAN MARIO 44725923 5/14/1982 PEON 10/21/2019 M 11 S/. 0.00
15 YAPURA PERALTA FLORENCIO 44593361 9/22/1987 PEON 10/21/2019 M 11 S/. 0.00
16 S/. 0.00
17 S/. 0.00
18 S/. 0.00
19 S/. 0.00
20 S/. 0.00
21 S/. 0.00
PARCIAL S/. 0.00

TOTAL S/. 5,659.43


8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023

SALDO DE MATERIALES AÑO FISCAL 2023


SALDO ANTERIOR MOVIMIENTO MENSUAL FEBRERO 2023
ORDEN SALDO VALORIZADO
N° DESCRIPCION INSUMOS CANTIDAD UND. P.U. TOTAL ENTRADAS SALIDA
COMP./SERV. CANTIDAD PARCIAL
CANT PARCIAL CANT. PARCIAL CANT PARCIAL
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


2
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


3
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


4
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


5
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


6
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


7
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


8
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


9
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


10
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


11
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


12
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


13
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


14
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
14
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


15
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


17
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


18
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


19
56 0 #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


20
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


21
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


22
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

27.00 0 #REF! #REF! #REF! #REF! #REF! #REF!


23
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


24
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


25
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


26
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


27
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


28
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


29
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


30
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


31
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
31
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


32
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
33
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


34
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


35
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


36
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


37
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


38
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


39
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


40
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


41
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


42
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


43
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


44
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


45
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


46
#REF! #REF! #REF! #REF!

COMBUSTIBLE

92 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

93 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
#REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
#REF!
SALDO ANTERIOR MOVIMIENTO MENSUAL JULIO 2019
ORDEN SALDO VALORIZADO
N° DESCRIPCION INSUMOS CANTIDAD UND. P.U. TOTAL ENTRADAS SALIDA
COMP./SERV. CANTIDAD PARCIAL
CANT PARCIAL CANT. PARCIAL CANT PARCIAL
94 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
95 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
96 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
97 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
98 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
99 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
101 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
102 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
103 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
104 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
105 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
106 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
107 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
108 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
109 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
110 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
111 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
112 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
113 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
114 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
115 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
116 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
117 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
118 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
119 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
121 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
122 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
123 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
124 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
125 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
126 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
127 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
128 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
129 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
130 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
131 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
132 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
133 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
134 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
135 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
136 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
137 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
138 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
139 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
140 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
141 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
142 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
143 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
144 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
145 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
146 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
147 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
148 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
149 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
150 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
151 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
152 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
153 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
154 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
155 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
156 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
157 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
158 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
159 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
161 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
162 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
163 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
164 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
165 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
166 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
167 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
168 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
169 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
170 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
171 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
172 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
173 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
174 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
175 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
176 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
177 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
178 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
179 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
180 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
181 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
182 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
183 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
184 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
185 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
186 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
187 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
188 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
189 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 2/28/2023
190 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
191 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
192 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
193 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
194 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
195 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
196 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
197 #REF! #REF! 20 UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
198 #REF! 453 20 UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
199 #REF! 453 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
200 #REF! 453 20 UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
201 #REF! 537 5 UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
202 #REF! 537 5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
203 #REF! 537 30 GLN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
204 #REF! 537 25 GLN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
205 #REF! 537 5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
206 #REF! Prestamo 60 BLS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF!
207 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
208 #REF! #REF! #REF! UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
209 #REF! #REF! #REF! UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF!
210 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
211 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

TOTAL COSTO DIRECTO #REF! #REF! #REF! #REF!


MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO

OBRA: RESIDENTE: ING. WILLIAM DAVID VARGAS MUÑOZ


“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”,
“W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” INSPECTOR: ING. WILBERT RAUL HURTADO TERRAZAS
FECHA: 3/26/2023

SALDO DE MATERIALES AÑO FISCAL 2023


SALDO ANTERIOR MOVIMIENTO MENSUAL FEBRERO 2023
ORDEN SALDO VALORIZADO
ITEM MATERIAL CANT UND P.U. TOTAL ENTRADAS SALIDAS
COMP/SERV. CANTIDAD PARCIAL
CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
CARTEL DE OBRA

1 GIGANTOGRAFIA DE LONA 13OZ 2.40MX3.60M -NACIONAL 1245 - UND 500.00 - - S/. - - S/. - - S/. - - S/. -

ADQUICISION DE BOTAS DE JEBE

1 BOTA DE JEBE - ALBERCOM 1296 - UND 44.25 - 10.00 S/. 442.50 - S/. - 9.00 S/. 398.25 1.00 S/. 44.25

ADQUICISION DE CARRETILLAS
1 CARRETILLA DE METAL TIPO BUGUI -ISIDORA -TRUPER 1281 - UND 311.52 - 8.00 S/. 2,492.16 - S/. - 4.00 S/. 1,246.08 4.00 S/. 1,246.08

ADQUICISION DE PAPEL TOALLA


1 PAPEL TOALLA HOJA SIMPLE BLANCO X 300M-DIONNE 1259 - UND 48.97 - 19.00 S/. 930.43 - S/. - 5.00 S/. 244.85 14.00 S/. 685.58

MATERIALES DE FERRETERIA
1 BALDE DE PLASTICO X 5GL-NACIONAL 1295 UND 9.80 - 8.00 S/. 78.40 - S/. - 4.00 S/. 39.20 4.00 S/. 39.20

2 CABLE VULCANIZADO 2X 12AWG-INDECO ECO 1295 METRO 4.50 - 100.00 S/. 450.00 - S/. - - S/. - 100.00 S/. 450.00

3 CILINDRO DE PLASTICO X 55 GL -NACIONAL 1295 UND 160.00 - 8.00 S/. 1,280.00 - S/. - - S/. - 8.00 S/. 1,280.00

4 CINTA TEFLON 1/2 IN X 12 M - MV 1295 UND 0.90 - 7.00 S/. 6.30 - S/. - - S/. - 7.00 S/. 6.30

5 DINAMOMETRO SIMPLE 12.KG - GERMANY 1295 UND 24.00 - 1.00 S/. 24.00 - S/. - - S/. - 1.00 S/. 24.00

6 DINAMOMETRO SIMPLE 50.KG - GERMANY 1295 UND 40.00 - 1.00 S/. 40.00 - S/. - - S/. - 1.00 S/. 40.00

7 MANGERA DE JEBE 16MM REFORZADO - QUIVER 1295 METRO 2.80 - 50.00 S/. 140.00 - S/. - - S/. - 50.00 S/. 140.00

8 OCRE COLOR ROJO-BAJER 1295 KLG 5.70 - 300.00 S/. 1,710.00 - S/. - - S/. - 300.00 S/. 1,710.00

9 PEGAMENTRO PARA PVC X 1 GL - OATEY 1295 UND 148.00 - 1.00 S/. 148.00 - S/. - - S/. - 1.00 S/. 148.00

10 PLASTICO 3.00 M DE ANCHO COLOR AZUL-PLASTIC 1295 METRO 4.20 - 200.00 S/. 840.00 - S/. - - S/. - 200.00 S/. 840.00

11 SOGA DE NAILON 3/4 IN - DRIZA 1295 METRO 4.80 - 100.00 S/. 480.00 - S/. - - S/. - 100.00 S/. 480.00

12 WINCHA DE LONA DE 50M -KAMASA 1295 UND 55.00 - 1.00 S/. 55.00 - S/. - - S/. - 1.00 S/. 55.00

13 WINCHA DE METAL 8M -INGENCO 1295 UND 28.00 - 11.00 S/. 308.00 - S/. - 4.00 S/. 112.00 7.00 S/. 196.00

EQUIPOS DE PROTECCION PARA PERSONAL OBRERO


1 CASCO PROTECTOR DE PLASTICO - NACIONAL 1313 UND 9.00 - 4.00 S/. 36.00 - S/. - 4.00 S/. 36.00 - S/. -

2 GUANTE DE CUERO REFORSADO PARA SEGURIDAD TALLA M-NACIONAL 1313 PAR 9.70 - 10.00 S/. 97.00 - S/. - 8.00 S/. 77.60 2.00 S/. 19.40

3 GUANTE DE JEBE DE USO INDUSTRIAL CALIBRE 35 TALLA 9 - ETERNA 1313 PAR 9.70 - 10.00 S/. 97.00 - S/. - - S/. - 10.00 S/. 97.00

4 GUANTE DE POLIETILENO CON PALMA DE NITRILO TALLA M- SEGPRO 1313 PAR 4.50 - 14.00 S/. 63.00 - S/. - 13.00 S/. 58.50 1.00 S/. 4.50

5 LENTES DE PROTECCION DE POLICARBONATO LUNAS CLARAS -ASTARA 1313 UND 4.50 - 20.00 S/. 90.00 - S/. - 8.00 S/. 36.00 12.00 S/. 54.00

6 LENTE DE PROTECCION DE POLICARBONATO LUNAS OSCURAS - ASTARA 1313 UND 4.50 - 14.00 S/. 63.00 - S/. - 1.00 S/. 4.50 13.00 S/. 58.50

7 MASCARILLA DESCARTABLE CON 3 PLIEGUES PARA PROTEGER DE POLVOS -MAYFIELD 1313 MPX50 7.50 - 2.00 S/. 15.00 - S/. - - S/. - 2.00 S/. 15.00

8 GUANTES DE LATEX QUIRURJICO ESTERILES DE UN SOLO USO-IMPORTADA 1313 UND 1.30 - 100.00 S/. 130.00 - S/. - - S/. - 100.00 S/. 130.00

9 PONCHO IMPERMIABLE CON CAPUCHA - SEGPRO 1313 UND 24.50 - 3.00 S/. 73.50 - S/. - 3.00 S/. 73.50 - S/. -

10 PROTECTOR AUDITIVO TIPO TAPON DE MONOPRENO CON CORDON DE POLIESTER-TROPA 1313 UND 1.30 - 4.00 S/. 5.20 - S/. - 1.00 S/. 1.30 3.00 S/. 3.90

11 RESPIRADOR NAZAL CON FILTRO PARA VAPORES INORGANICOS X12 -ASA 1313 UND 97.00 - 1.00 S/. 97.00 - S/. - - S/. - 1.00 S/. 97.00

12 ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX- PROMAX 1313 PAR 75.00 - 3.00 S/. 225.00 - S/. - 3.00 S/. 225.00 - S/. -

ALMACEN CENTRAL
1 YESO DE 28 KG NEA 2.00 BLS 9.00 18.00 - S/. - - S/. - - S/. - - S/. -

2 PINTURA DE TRAFICO COLOR NEGRO NEA 1.00 GLN 135.00 135.00 - S/. - - S/. - - S/. - - S/. -

3 CHALECO DE IDENTIFICACION PARA PERSONAL OBRERO NEA 5.00 UND 40.00 200.00 5.00 S/. 200.00 - S/. - 5.00 S/. 200.00 - S/. -

4 ESCOBA DE PLASTICO REF. CON MANGO DE 30 CM NEA 3.00 UND 15.00 45.00 1.00 S/. 15.00 - S/. - 1.00 S/. 15.00 - S/. -

5 GUANTE DE JEBE N-9 NEA 5.00 PAR 10.50 52.50 5.00 S/. 52.50 - S/. - - S/. - 5.00 S/. 52.50
6 GUANTE DE CUERO REFORZADO TIPO BADANA NEA 5.00 PAR 9.50 47.50 - S/. - - S/. - - S/. - - S/. -

7 PINTURA DE TRAFICO COLOR AMARILLO NEA 1.00 GLN 65.00 65.00 - S/. - - S/. - - S/. - - S/. -

8 THIÑER ACRILICO NEA 2.00 GLN 18.00 36.00 - S/. - - S/. - - S/. - - S/. -

9 ZAPATOS PUNTA ACERO PARA PERSONAL OBRERO NEA 3.00 PAR 75.00 225.00 3.00 S/. 225.00 - S/. - 2.00 S/. 150.00 1.00 S/. 75.00

CONTRATACION DE CALAMINA
1 CALAMINA GALVANIZADA 0.22 MM X 1.80 M - ZJ ZEJIM 1256 60.00 UND 22.01 1,320.42 45.00 S/. 990.32 - S/. - 29.00 S/. 638.20 16.00 S/. 352.11

CONTRATACION DE HOJAS BOND


1 PAPEL BOND 75G TAMAÑO A4-JUSTUS 1290 8.00 EMPX500 21.50 172.00 6.00 S/. 129.00 - S/. - 4.00 S/. 86.00 2.00 S/. 43.00

BOMBA MANUAL DE TRANSFERENCIA DE COMBUSTIBLE


1 BOMBA MANUAL DE TRANSFERENCIA DE COMBUSTIBLE-TRUPER 1271 1.00 UND 135.00 135.00 1.00 S/. 135.00 - S/. - - S/. - 1.00 S/. 135.00

HERRAMIENTAS DE TRABAJO MANUAL


1 PALA TIPO CUCHARA DE ACERO CON MANGO DE MADERA - APOLO 1284 15.00 UND 47.50 712.43 10.00 S/. 474.95 - S/. - 6.00 S/. 284.97 4.00 S/. 189.98

CONTRATACION DE CIZALLA
1 CIZALLA 12 IN- IMPORTADA 1219 1.00 UND 56.00 56.00 1.00 S/. 56.00 - S/. - 1.00 S/. 56.00 - S/. -

VARILLAS DE ACERO
1 VARILLA DE ACERO CORRUGADO GRADO 60 DE 1/2 IN X 9M -ACEROS AREQUIPA 1239 30.00 UND 51.60 1,548.00 28.00 S/. 1,444.80 - S/. - 1.00 S/. 51.60 27.00 S/. 1,393.20

HERRAMIENTAS DE TRABAJO MANUAL


1 BARRRETA DE FIERRO HEXAGONAL 1 IN X 1.5 M -APOLO 1285 5.00 UND 64.90 324.50 2.00 S/. 129.80 - S/. - 1.00 S/. 64.90 1.00 S/. 64.90

2 PICO DE ACERO CON MANGO DE MADERA -APOLO 1285 15.00 UND 84.96 1,274.40 10.00 S/. 849.60 - S/. - 7.00 S/. 594.72 3.00 S/. 254.88

UNIFORME PARA PERSONAL OBRERO


1 CHALECO DE DRIL UNISEX COLOR ROJO -NACIONAL 1232 10.00 UND 32.00 320.00 4.00 S/. 128.00 - S/. - 4.00 S/. 128.00 - S/. -

2 UNIFORME DE FAINA DRILL -OBRERO UNISEX-NACIONAL 1232 10.00 UND 63.50 635.00 4.00 S/. 254.00 - S/. - 1.00 S/. 63.50 3.00 S/. 190.50

MATERIALES EPP
1 CINTA DE SEÑALIZACION DE SEGURIDAD DE PLASTICO 15CM X 100M -NACIONAL 1276 10.00 UND 16.00 160.00 10.00 S/. 160.00 - S/. - 1.00 S/. 16.00 9.00 S/. 144.00

2 CONO DE SEGURIDAD 70CM -SEGPRO 1276 100.00 UND 32.00 3,200.00 96.00 S/. 3,072.00 - S/. - 2.00 S/. 64.00 94.00 S/. 3,008.00

3 LINTERNA LED RECARGABLE DE MANO CON ADAPTADOR 110/220V -OPALUX 1276 1.00 UND 100.00 100.00 1.00 S/. 100.00 - S/. - - S/. - 1.00 S/. 100.00

4 MALLA DE POLIPROPILENO PARA SEÑALIZACION DE SEGURIDAD 1M X 50 M COLOR ANARANJADO - SEGPRO 1276 10.00 UND 38.00 380.00 10.00 S/. 380.00 - S/. - - S/. - 10.00 S/. 380.00

EQUIPO LIVIANOS
1 AMOLADORA DE 7IN -BOSH 1279 1.00 UND 950.00 950.00 1.00 S/. 950.00 - S/. - - S/. - 1.00 S/. 950.00

2 COMPACTADOR VIFRATORIO TIPO PLANCHA 5.5 HP-FORCE HONDA 1279 1.00 UND 3520.00 3,520.00 1.00 S/. 3,520.00 - S/. - - S/. - 1.00 S/. 3,520.00

3 MARTILLO DEMOLEDOR ELECTRICO- DEWALT 1279 1.00 UND 3400.00 3,400.00 1.00 S/. 3,400.00 - S/. - - S/. - 1.00 S/. 3,400.00

4 ROTOMARTILLO 1500W - EMTOP 1279 1.00 UND 650.00 650.00 1.00 S/. 650.00 - S/. - - S/. - 1.00 S/. 650.00

5 SIERRA CIRCULAR DE 7 1/4 IN - BOSH 1279 1.00 UND 580.00 580.00 1.00 S/. 580.00 - S/. - - S/. - 1.00 S/. 580.00

ALAMBRE Y CLAVOS
1 ALAMBRE DE ACERO NEGRO RECOSIDO CALIBRE 16 - TREPER 1231 150.00 KLG 5.30 795.00 150.00 S/. 795.00 - S/. - 1.00 S/. 5.30 149.00 S/. 789.70

2 ALAMBRE DE ACERO NEGRO RECOSIDO CALIBRE 8 -TREPER 1231 150.00 KLG 5.30 795.00 150.00 S/. 795.00 - S/. - 5.00 S/. 26.50 145.00 S/. 768.50

3 CLAVO DE FIERRO 3 IN (AL PESO)-TREPER 1231 350.00 KLG 5.30 1,855.00 350.00 S/. 1,855.00 - S/. - 1.00 S/. 5.30 349.00 S/. 1,849.70

4 CLAVO DE FIERRO 4 IN (AL PESO) -TREPER 1231 100.00 KLG 5.30 530.00 100.00 S/. 530.00 - S/. - - S/. - 100.00 S/. 530.00

5 CLAVO DE FIERRO PARA CALAMINA 3 IN(AL PESO)-KAMALY 1231 10.00 KLG 8.00 80.00 6.00 S/. 48.00 - S/. - 4.00 S/. 32.00 2.00 S/. 16.00

HERRAMIENTAS MANUALES
1 CINCEL PLANO 12 IN - CYA 1233 10.00 UND 20.00 200.00 9.00 S/. 180.00 - S/. - 1.00 S/. 20.00 8.00 S/. 160.00

2 CINCEL PUNTA 12 IN -CYA 1233 10.00 UND 20.00 200.00 9.00 S/. 180.00 - S/. - - S/. - 9.00 S/. 180.00

3 CIZALLA DE ACERO 24 IN -KAMALY 1233 1.00 UND 68.00 68.00 1.00 S/. 68.00 - S/. - - S/. - 1.00 S/. 68.00
4 COMBA 12 LB -TRUPER 1233 3.00 UND 112.00 336.00 2.00 S/. 224.00 - S/. - - S/. - 2.00 S/. 224.00

5 COMBA 20 LB - TRUPER 1233 3.00 UND 208.00 624.00 3.00 S/. 624.00 - S/. - - S/. - 3.00 S/. 624.00

6 COMBA DE 4 LB - TRUPER 1233 3.00 UND 56.50 169.50 1.00 S/. 56.50 - S/. - - S/. - 1.00 S/. 56.50

7 RASTRILLO DE METAL 16 DIENTES 120 CM -CASCO 1233 3.00 UND 21.00 63.00 2.00 S/. 42.00 - S/. - 2.00 S/. 42.00 - S/. -

IMPLEMENTOS DE PREVENCION COVID 19


1 ALGODÓN HIDROFILO X 100 G-FARMA PRECIO 1226 2.00 UND 5.00 10.00 2.00 S/. 10.00 - S/. - - S/. - 2.00 S/. 10.00

2 ESPADRAPO HIPOALERGENICO DE PAPEL 5 CM X 9.1 M-3M 1226 1.00 UND 8.00 8.00 1.00 S/. 8.00 - S/. - - S/. - 1.00 S/. 8.00

3 GASA ESTERIL PRECORTADA 10 CM X 10 CM - TOPMEDIC 1226 10.00 UND 2.00 20.00 10.00 S/. 20.00 - S/. - - S/. - 10.00 S/. 20.00

4 GUANTES DE LATEX QUIRURJICO ESTERILES DE UN SOLO USO-IMPORTADA 1226 100.00 UND 2.00 200.00 100.00 S/. 200.00 - S/. - - S/. - 100.00 S/. 200.00

5 PARACETAMOL 500 MG TAB-PORTUGAL 1226 50.00 UND 0.30 15.00 50.00 S/. 15.00 - S/. - 13.00 S/. 3.90 37.00 S/. 11.10

6 PEROXIDO DE HIDROGENO 10 VSOL X 120 ML- ALCOFARMA 1226 2.00 UND 2.00 4.00 2.00 S/. 4.00 - S/. - - S/. - 2.00 S/. 4.00

7 TIJERA DE METAL 13 CM (5 1/8 IN)PUNTA METAL IMPORTADA 1226 1.00 UND 18.00 18.00 1.00 S/. 18.00 - S/. - - S/. - 1.00 S/. 18.00

8 VENDA ELASTICA 3IN X YD -GOD LIFE 1226 1.00 UND 2.00 2.00 1.00 S/. 2.00 - S/. - - S/. - 1.00 S/. 2.00

9 VENDA ELASTICA 4IN X5YD ALKHOFAR 1226 1.00 UND 2.50 2.50 1.00 S/. 2.50 - S/. - - S/. - 1.00 S/. 2.50

10 YODO POVIDONA 8.5 G /100 ML SOL120ML-IMPORTADO 1226 2.00 UND 11.00 22.00 2.00 S/. 22.00 - S/. - - S/. - 2.00 S/. 22.00

IMPLEMENTOS DE BOTIQUIN
1 ALCOHOL ETILICO (ETANOL)96° X 1 L- ALCOFARMA 1114 7.00 UND 10.50 73.50 6.00 S/. 63.00 - S/. - - S/. - 6.00 S/. 63.00

2 ALGODÓN HIDROFILO X 100 G-FARMA 1114 1.00 UND 4.30 4.30 1.00 S/. 4.30 - S/. - - S/. - 1.00 S/. 4.30

3 AMOXICILINA 250 MG TAB-FARMA 1114 100.00 UND 0.49 49.00 100.00 S/. 49.00 - S/. - 20.00 S/. 9.80 80.00 S/. 39.20

4 APOSITO DE GASA FRACCIONADA 10 X 10 CM -GASA 1114 5.00 UND 4.70 23.50 5.00 S/. 23.50 - S/. - - S/. - 5.00 S/. 23.50

5 BAJALENGUA DE MADERA ADULTO X 100 -BAJANEGUA 1114 1.00 UND 38.00 38.00 1.00 S/. 38.00 - S/. - - S/. - 1.00 S/. 38.00

6 CLORURO DE SODIO AL 0.9 % X100 ML -CLORURO 1114 1.00 UND 8.60 8.60 1.00 S/. 8.60 - S/. - - S/. - 1.00 S/. 8.60

7 ESPADRAPO HIPOALERGENICO DE PAPEL 5 CM X 9.1 M-3M 1114 1.00 UND 15.80 15.80 1.00 S/. 15.80 - S/. - - S/. - 1.00 S/. 15.80

8 GASA ESTERIL 7.5 X7.5 DE 8 PLIEGUES X 3 UND -GASA 1114 4.00 UND 2.50 10.00 4.00 S/. 10.00 - S/. - - S/. - 4.00 S/. 10.00

9 GASA ESTERIL PRECORTADA 10X10 CM-GASA 1114 5.00 UND 2.50 12.50 5.00 S/. 12.50 - S/. - - S/. - 5.00 S/. 12.50

10 IBUPROFENO 800 MG TAB-PORTUGAL 1114 50.00 UND 0.40 20.00 50.00 S/. 20.00 - S/. - 2.00 S/. 0.80 48.00 S/. 19.20

11 PEROXIDO DE HIDROGENO 20 V SOL X1L -OXIGENADA 1114 7.00 UND 8.00 56.00 7.00 S/. 56.00 - S/. - - S/. - 7.00 S/. 56.00

12 PINZA KELLY RECTA 5 1/2 IN -QUIRURJICA 1114 1.00 UND 30.00 30.00 1.00 S/. 30.00 - S/. - - S/. - 1.00 S/. 30.00

13 VENDA ELASTICA 3 IN X 5 YD -ALKHOFAR 1114 2.00 UND 2.20 4.40 2.00 S/. 4.40 - S/. - - S/. - 2.00 S/. 4.40

14 VENDA ELASTICA 4 IN X 5 YD -ALKHOFAR 1114 2.00 UND 2.70 5.40 2.00 S/. 5.40 - S/. - - S/. - 2.00 S/. 5.40

15 YODO POVIDONA 8.5 G /100 ML SOL120ML-YODOPOVIDONA 1114 1.00 UND 22.50 22.50 1.00 S/. 22.50 - S/. - - S/. - 1.00 S/. 22.50

ÚTILES DE IMPRENTA
1 CUADERNO DE OBRA TAMAÑO A4 X100 HOJAS - NACIONAL 1039 5.00 UND 58.00 290.00 5.00 S/. 290.00 - S/. - 1.00 S/. 58.00 4.00 S/. 232.00

2 FORMATO DE PARTE DIARIO- NACIONAL 1039 5.00 UND 25.00 125.00 5.00 S/. 125.00 - S/. - - S/. - 5.00 S/. 125.00

3 FORMATO NOTA DE ENTRADA AL ALMACEN BLOCK X 50 JUEGOS - NACIONAL 1039 5.00 UND 25.00 125.00 5.00 S/. 125.00 - S/. - - S/. - 5.00 S/. 125.00

4 FORMATO NOTA DE SALIDA DEL ALMACEN AUTOCOPIATIVO BLOCK X50 HOJAS - NACIONAL 1039 7.00 UND 25.00 175.00 7.00 S/. 175.00 - S/. - 1.00 S/. 25.00 6.00 S/. 150.00

5 SELLO DE JEBE DEL PERSONAL - NACIONAL 1039 - UND 28.00 - - S/. - - S/. - - S/. - - S/. -

6 TARJETA DE CONTROL VISIBLE DE ALMACEN - NACIONAL 1039 - CIENTO 28.00 - - S/. - - S/. - - S/. - - S/. -

EQUIPO DE PROTECCION PERSONAL TECNICO


1 CASCO PROTECTOR DE POLIETILENO DE ALTA DENSIDAD COLOR BLANCO- 3M 1065 10.00 UND 50.00 500.00 4.00 S/. 200.00 - S/. - 4.00 S/. 200.00 - S/. -

2 CAHELCO DE DRIL TIPO PERIODISTA UNISEX - DRILL 1065 10.00 UND 95.00 950.00 4.00 S/. 380.00 - S/. - 4.00 S/. 380.00 - S/. -

3 CORTAVIENTO PROTECTOR DE DRIL PARA USO DEBAJO DEL CASCO - DRILL 1065 10.00 UND 5.00 50.00 4.00 S/. 20.00 - S/. - - S/. - 4.00 S/. 20.00

4 LENTES DE SEGURIDAD CON PROTECCION ULTRAVIOLETA - STEEELPRO 1065 10.00 UND 40.00 400.00 4.00 S/. 160.00 - S/. - - S/. - 4.00 S/. 160.00

5 PONCHO IMPERMIABLE CON CAPUCHA - TASLAN 1065 10.00 UND 22.00 220.00 10.00 S/. 220.00 - S/. - 9.00 S/. 198.00 1.00 S/. 22.00

6 ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX - CLUTE 1065 5.00 PAR 320.00 1,600.00 - S/. - - S/. - - S/. - - S/. -

PAPEL BOND 75G. TAMAÑO A4

1 PAPEL BOND 75G. TAMAÑO A4 - CHAMEX 0056 12.00 MILL 39.40 472.80 - S/. - 12.00 S/. 472.80 - S/. - 12.00 S/. 472.80

GIGANTOGRAFIA DE LONA
1 GIGANTOGRAFIA DE LONA 13 OZ 2.40M X 3.60M 0060 1.00 UND 510.00 510.00 - S/. - 1.00 S/. 510.00 1.00 S/. 510.00 - S/. -

TOTAL COSTO DIRECTO S/. 36,069.46 S/. 0.00 S/. 5,972.27 S/. 30,097.18
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

MOVIMIENTO DIARIO DE ALMACEN DE OBRA CORRESPONDIENTE AL MES DE FEBRERO DEL 20223

PROYECTO: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE
SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
MOVIMIENTO DIARIO ALMACEN - FEBRERO
ACUM. MES
ÍTEM O/C MATERIALES UND P.U. SALDO ANTERIOR INGR/SAL 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
FEBRERO
SALDO TOTAL
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

CARTEL DE OBRA
INGRESO -
1 1245 GIGANTOGRAFIA DE LONA 13OZ 2.40MX3.60M -NACIONAL UND 500.00 - -
SALIDA -
ADQUICISION DE BOTAS DE JEBE
INGRESO -
1 1296 BOTA DE JEBE - ALBERCOM UND 44.25 10.00 1.00
SALIDA 5.0 3.0 1.0 9.0
ADQUICISION DE CARRETILLAS
INGRESO -
1 1281 CARRETILLA DE METAL TIPO BUGUI -ISIDORA -TRUPER UND 311.52 8.00 4.00
SALIDA 1.0 1.0 1.0 1.0 4.0
ADQUICISION DE PAPEL TOALLA
INGRESO -
1 1259 PAPEL TOALLA HOJA SIMPLE BLANCO X 300M-DIONNE UND 48.97 19.00 14.00
SALIDA 2.0 1.0 1.0 1.0 5.0
MATERIALES DE FERRETERIA
INGRESO -
1 1295 BALDE DE PLASTICO X 5GL-NACIONAL UND 9.80 8.00 4.00
SALIDA 4.0 4.0
INGRESO -
2 1295 CABLE VULCANIZADO 2X 12AWG-INDECO ECO METRO 4.50 100.00 100.00
SALIDA -
INGRESO -
3 1295 CILINDRO DE PLASTICO X 55 GL -NACIONAL UND 160.00 8.00 8.00
SALIDA -
INGRESO -
4 1295 CINTA TEFLON 1/2 IN X 12 M - MV UND 0.90 7.00 7.00
SALIDA -
INGRESO -
5 1295 DINAMOMETRO SIMPLE 12.KG - GERMANY UND 24.00 1.00 1.00
SALIDA -
INGRESO -
6 1295 DINAMOMETRO SIMPLE 50.KG - GERMANY UND 40.00 1.00 1.00
SALIDA -
INGRESO -
7 1295 MANGERA DE JEBE 16MM REFORZADO - QUIVER METRO 2.80 50.00 50.00
SALIDA -
INGRESO -
8 1295 OCRE COLOR ROJO-BAJER KLG 5.70 300.00 300.00
SALIDA -
INGRESO -
9 1295 PEGAMENTRO PARA PVC X 1 GL - OATEY UND 148.00 1.00 1.00
SALIDA -
INGRESO -
10 1295 PLASTICO 3.00 M DE ANCHO COLOR AZUL-PLASTIC METRO 4.20 200.00 200.00
SALIDA -
INGRESO -
11 1295 SOGA DE NAILON 3/4 IN - DRIZA METRO 4.80 100.00 100.00
SALIDA -
INGRESO -
12 1295 WINCHA DE LONA DE 50M -KAMASA UND 55.00 1.00 1.00
SALIDA -
INGRESO -
13 1295 WINCHA DE METAL 8M -INGENCO UND 28.00 11.00 7.00
SALIDA 2.0 1.0 1.0 4.0
EQUIPOS DE PROTECCION PARA PERSONAL OBRERO
INGRESO -
1 1313 CASCO PROTECTOR DE PLASTICO - NACIONAL UND 9.00 4.00 -
SALIDA 4.0 4.0
INGRESO -
2 1313 GUANTE DE CUERO REFORSADO PARA SEGURIDAD TALLA M-NACIONAL PAR 9.70 10.00 2.00
SALIDA 5.0 2.0 1.0 8.0
INGRESO -
3 1313 GUANTE DE JEBE DE USO INDUSTRIAL CALIBRE 35 TALLA 9 - ETERNA PAR 9.70 10.00 10.00
SALIDA -
INGRESO -
4 1313 GUANTE DE POLIETILENO CON PALMA DE NITRILO TALLA M- SEGPRO PAR 4.50 14.00 1.00
SALIDA 3.0 8.0 1.0 1.0 13.0
INGRESO -
5 1313 LENTES DE PROTECCION DE POLICARBONATO LUNAS CLARAS -ASTARA UND 4.50 20.00 12.00
SALIDA 4.0 2.0 1.0 1.0 8.0
INGRESO -
6 1313 LENTE DE PROTECCION DE POLICARBONATO LUNAS OSCURAS - ASTARA UND 4.50 14.00 13.00
SALIDA 1.0 1.0
MASCARILLA DESCARTABLE CON 3 PLIEGUES PARA PROTEGER DE INGRESO -
7 1313
POLVOS -MAYFIELD
MPX50 7.50 2.00 2.00
SALIDA -
GUANTES DE LATEX QUIRURJICO ESTERILES DE UN SOLO USO- INGRESO -
8 1313
IMPORTADA
UND 1.30 100.00 100.00
SALIDA -
INGRESO -
9 1313 PONCHO IMPERMIABLE CON CAPUCHA - SEGPRO UND 24.50 3.00 -
SALIDA 3.0 3.0
PROTECTOR AUDITIVO TIPO TAPON DE MONOPRENO CON CORDON DE INGRESO -
10 1313
POLIESTER-TROPA
UND 1.30 4.00 3.00
SALIDA 1.0 1.0
INGRESO -
11 1313 RESPIRADOR NAZAL CON FILTRO PARA VAPORES INORGANICOS X12 -ASA UND 97.00 1.00 1.00
SALIDA -
INGRESO -
12 1313 ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX- PROMAX PAR 75.00 3.00 -
SALIDA 1.0 2.0 3.0
ALMACEN CENTRAL
INGRESO -
1 NEA YESO DE 28 KG BLS 9.00 - -
SALIDA -
INGRESO -
1 NEA PINTURA DE TRAFICO COLOR NEGRO GLN 135.00 - -
SALIDA -
INGRESO -
3 NEA CHALECO DE IDENTIFICACION PARA PERSONAL OBRERO UND 40.00 5.00 -
SALIDA 2.0 1.0 2.0 5.0
INGRESO -
4 NEA ESCOBA DE PLASTICO REF. CON MANGO DE 30 CM UND 15.00 1.00 -
SALIDA 1.0 1.0
INGRESO -
5 NEA GUANTE DE JEBE N-9 PAR 10.50 5.00 5.00
SALIDA -
INGRESO -
6 NEA GUANTE DE CUERO REFORZADO TIPO BADANA PAR 9.50 - -
SALIDA -
INGRESO -
7 NEA PINTURA DE TRAFICO COLOR AMARILLO GLN 65.00 - -
SALIDA -
INGRESO -
8 NEA THIÑER ACRILICO GLN 18.00 - -
SALIDA -
INGRESO -
9 NEA ZAPATOS PUNTA ACERO PARA PERSONAL OBRERO PAR 75.00 3.00 1.00
SALIDA 1.0 1.0 2.0
CONTRATACION DE CALAMINA
INGRESO -
1 1256 CALAMINA GALVANIZADA 0.22 MM X 1.80 M - ZJ ZEJIM UND 22.01 45.00 16.00
SALIDA 4.0 20.0 5.0 29.0
CONTRATACION DE HOJAS BOND
INGRESO -
1 1290 PAPEL BOND 75G TAMAÑO A4-JUSTUS EMPX500 21.50 6.00 2.00
SALIDA 1.0 1.0 1.0 1.0 4.0
BOMBA MANUAL DE TRANSFERENCIA DE COMBUSTIBLE
INGRESO -
1 1271 BOMBA MANUAL DE TRANSFERENCIA DE COMBUSTIBLE-TRUPER UND 135.00 1.00 1.00
SALIDA -
HERRAMIENTAS DE TRABAJO MANUAL
INGRESO -
1 1284 PALA TIPO CUCHARA DE ACERO CON MANGO DE MADERA - APOLO UND 47.50 10.00 4.00
SALIDA 2.0 2.0 1.0 1.0 6.0
CONTRATACION DE CIZALLA
INGRESO -
1 1219 CIZALLA 12 IN- IMPORTADA UND 56.00 1.00 -
SALIDA 1.0 1.0
VARILLAS DE ACERO
VARILLA DE ACERO CORRUGADO GRADO 60 DE 1/2 IN X 9M -ACEROS INGRESO -
1 1239
AREQUIPA
UND 51.60 28.00 27.00
SALIDA 1.0 1.0
HERRAMIENTAS DE TRABAJO MANUAL
INGRESO -
1 1285 BARRRETA DE FIERRO HEXAGONAL 1 IN X 1.5 M -APOLO UND 64.90 2.00 1.00
SALIDA 1.0 1.0
INGRESO -
2 1285 PICO DE ACERO CON MANGO DE MADERA -APOLO UND 84.96 10.00 3.00
SALIDA 4.0 2.0 1.0 7.0
UNIFORME PARA PERSONAL OBRERO
INGRESO -
1 1232 CHALECO DE DRIL UNISEX COLOR ROJO -NACIONAL UND 32.00 4.00 -
SALIDA 1.0 3.0 4.0
INGRESO -
2 1232 UNIFORME DE FAINA DRILL -OBRERO UNISEX-NACIONAL UND 63.50 4.00 3.00
SALIDA 1.0 1.0
MATERIALES EPP
CINTA DE SEÑALIZACION DE SEGURIDAD DE PLASTICO 15CM X 100M - INGRESO -
1 1276
NACIONAL
UND 16.00 10.00 9.00
SALIDA 1.0 1.0
INGRESO -
2 1276 CONO DE SEGURIDAD 70CM -SEGPRO UND 32.00 96.00 94.00
SALIDA 2.0 2.0
LINTERNA LED RECARGABLE DE MANO CON ADAPTADOR 110/220V - INGRESO -
3 1276
OPALUX
UND 100.00 1.00 1.00
SALIDA -
MALLA DE POLIPROPILENO PARA SEÑALIZACION DE SEGURIDAD 1M X 50 M INGRESO -
4 1276
COLOR ANARANJADO - SEGPRO
UND 38.00 10.00 10.00
SALIDA -
EQUIPO LIVIANOS
INGRESO -
1 1279 AMOLADORA DE 7IN -BOSH UND 950.00 1.00 1.00
SALIDA -
INGRESO -
2 1279 COMPACTADOR VIFRATORIO TIPO PLANCHA 5.5 HP-FORCE HONDA UND 3,520.00 1.00 1.00
SALIDA -
INGRESO -
3 1279 MARTILLO DEMOLEDOR ELECTRICO- DEWALT UND 3,400.00 1.00 1.00
SALIDA -
INGRESO -
4 1279 ROTOMARTILLO 1500W - EMTOP UND 650.00 1.00 1.00
SALIDA -
INGRESO -
5 1279 SIERRA CIRCULAR DE 7 1/4 IN - BOSH UND 580.00 1.00 1.00
SALIDA -
ALAMBRE Y CLAVOS
INGRESO -
1 1231 ALAMBRE DE ACERO NEGRO RECOSIDO CALIBRE 16 - TREPER KLG 5.30 150.00 149.00
SALIDA 1.0 1.0
INGRESO -
2 1231 ALAMBRE DE ACERO NEGRO RECOSIDO CALIBRE 8 -TREPER KLG 5.30 150.00 145.00
SALIDA 3.0 2.0 5.0
INGRESO -
3 1231 CLAVO DE FIERRO 3 IN (AL PESO)-TREPER KLG 5.30 350.00 349.00
SALIDA 1.0 1.0
INGRESO -
4 1231 CLAVO DE FIERRO 4 IN (AL PESO) -TREPER KLG 5.30 100.00 100.00
SALIDA -
INGRESO -
5 1231 CLAVO DE FIERRO PARA CALAMINA 3 IN(AL PESO)-KAMALY KLG 8.00 6.00 2.00
SALIDA 1.0 1.0 2.0 4.0
HERRAMIENTAS MANUALES
INGRESO -
1 1233 CINCEL PLANO 12 IN - CYA UND 20.00 9.00 8.00
SALIDA 1.0 1.0
INGRESO -
2 1233 CINCEL PUNTA 12 IN -CYA UND 20.00 9.00 9.00
SALIDA -
INGRESO -
3 1233 CIZALLA DE ACERO 24 IN -KAMALY UND 68.00 1.00 1.00
SALIDA -
INGRESO -
4 1233 COMBA 12 LB -TRUPER UND 112.00 2.00 2.00
SALIDA -
INGRESO -
5 1233 COMBA 20 LB - TRUPER UND 208.00 3.00 3.00
SALIDA -
INGRESO -
6 1233 COMBA DE 4 LB - TRUPER UND 56.50 1.00 1.00
SALIDA -
INGRESO -
7 1233 RASTRILLO DE METAL 16 DIENTES 120 CM -CASCO UND 21.00 2.00 -
SALIDA 1.0 1.0 2.0
IMPLEMENTOS DE PREVENCION COVID 19
INGRESO -
1 1226 ALGODÓN HIDROFILO X 100 G-FARMA PRECIO UND 5.00 2.00 2.00
SALIDA -
INGRESO -
2 1226 ESPADRAPO HIPOALERGENICO DE PAPEL 5 CM X 9.1 M-3M UND 8.00 1.00 1.00
SALIDA -
INGRESO -
3 1226 GASA ESTERIL PRECORTADA 10 CM X 10 CM - TOPMEDIC UND 2.00 10.00 10.00
SALIDA -
GUANTES DE LATEX QUIRURJICO ESTERILES DE UN SOLO USO- INGRESO -
4 1226
IMPORTADA
UND 2.00 100.00 100.00
SALIDA -
INGRESO -
5 1226 PARACETAMOL 500 MG TAB-PORTUGAL UND 0.30 50.00 37.00
SALIDA 13.0 13.0
INGRESO -
6 1226 PEROXIDO DE HIDROGENO 10 VSOL X 120 ML- ALCOFARMA UND 2.00 2.00 2.00
SALIDA -
INGRESO -
7 1226 TIJERA DE METAL 13 CM (5 1/8 IN)PUNTA METAL IMPORTADA UND 18.00 1.00 1.00
SALIDA -
INGRESO -
8 1226 VENDA ELASTICA 3IN X YD -GOD LIFE UND 2.00 1.00 1.00
SALIDA -
INGRESO -
9 1226 VENDA ELASTICA 4IN X 5YD -ALKHOFAR UND 2.50 1.00 1.00
SALIDA -
INGRESO -
10 1226 YODO POVIDONA 8.5 G /100 ML SOL120ML-IMPORTADO UND 11.00 2.00 2.00
SALIDA -
IMPLEMENTOS DE BOTIQUIN
INGRESO -
1 1114 ALCOHOL ETILICO (ETANOL)96° X 1 L- ALCOFARMA UND 10.50 6.00 6.00
SALIDA -
INGRESO -
2 1114 ALGODÓN HIDROFILO X 100 G-FARMA UND 4.30 1.00 1.00
SALIDA -
INGRESO -
3 1114 AMOXICILINA 250 MG TAB-FARMA UND 0.49 100.00 80.00
SALIDA 20.0 20.0
INGRESO -
4 1114 APOSITO DE GASA FRACCIONADA 10 X 10 CM -GASA UND 4.70 5.00 5.00
SALIDA -
INGRESO -
5 1114 BAJALENGUA DE MADERA ADULTO X 100 -BAJANEGUA UND 38.00 1.00 1.00
SALIDA -
INGRESO -
6 1114 CLORURO DE SODIO AL 0.9 % X100 ML -CLORURO UND 8.60 1.00 1.00
SALIDA -
INGRESO -
7 1114 ESPADRAPO HIPOALERGENICO DE PAPEL 5 CM X 9.1 M-3M UND 15.80 1.00 1.00
SALIDA -
INGRESO -
8 1114 GASA ESTERIL 7.5 X7.5 DE 8 PLIEGUES X 3 UND -GASA UND 2.50 4.00 4.00
SALIDA -
INGRESO -
9 1114 GASA ESTERIL PRECORTADA 10 CM X 10 CM - GASA UND 2.50 5.00 5.00
SALIDA -
INGRESO -
10 1114 IBUPROFENO 800 MG TAB-PORTUGAL UND 0.40 50.00 48.00
SALIDA 2.0 2.0
INGRESO -
11 1114 PEROXIDO DE HIDROGENO 20 VSOL X 1L - OXIGENADA UND 8.00 7.00 7.00
SALIDA -
INGRESO -
12 1114 PINZA KELLY RECTA 5 1/2 IN -QUIRURJICA UND 30.00 1.00 1.00
SALIDA -
INGRESO -
13 1114 VENDA ELASTICA 3 IN X 5 YD -ALKHOFAR UND 2.20 2.00 2.00
SALIDA -
INGRESO -
14 1114 VENDA ELASTICA 4 IN X 5 YD -ALKHOFAR UND 2.70 2.00 2.00
SALIDA -
INGRESO -
15 1114 YODO POVIDONA 8.5 G /100 ML SOL120ML-YODOPOVIDONA UND 22.50 1.00 1.00
SALIDA -
ÚTILES DE IMPRENTA
INGRESO -
1 1039 CUADERNO DE OBRA TAMAÑO A4 X100 HOJAS - NACIONAL UND 58.00 5.00 4.00
SALIDA 1.0 1.0
INGRESO -
2 1039 FORMATO DE PARTE DIARIO- NACIONAL UND 25.00 5.00 5.00
SALIDA -
FORMATO NOTA DE ENTRADA AL ALMACEN BLOCK X 50 JUEGOS - INGRESO -
3 1039
NACIONAL
UND 25.00 5.00 5.00
SALIDA -
FORMATO NOTA DE SALIDA DEL ALMACEN AUTOCOPIATIVO BLOCK X 50 INGRESO -
4 1039
JUEGOS - NACIONAL
UND 25.00 7.00 6.00
SALIDA 1.0 1.0
INGRESO -
5 1039 SELLO DE JEBE DEL PERSONAL - NACIONAL UND 28.00 - -
SALIDA -
INGRESO -
6 1039 TARJETA DE CONTROL VISIBLE DE ALMACEN - NACIONAL CIENTO 28.00 - -
SALIDA -
EQUIPOS DE PROTECCION PERSONAL TECNICO
CASCO DE PROTECCION DE POLIETILENO DE ALTA DENSIDAD COLOR INGRESO -
1 1065
BLANCO - 3M
UND 50.00 4.00 -
SALIDA 4.0 4.0
INGRESO -
2 1065 CHALECO DE DRIL TIPO PERIODISTA UNISEX- DRILL UND 95.00 4.00 -
SALIDA 4.0 4.0
CORTAVIENTO PROTECTOR DE DRIL PARA USO DEBAJO DEL CASCO - INGRESO -
3 1065
DRILL
UND 5.00 4.00 4.00
SALIDA -
INGRESO -
4 1065 LENTES DE SEGURIDAD CON PROTECCION ULTRAVIOLETA - STEELPRO UND 40.00 4.00 4.00
SALIDA -
INGRESO -
5 1065 PONCHO IMPERMIABLE CON CAPUCHA - TASLAN UND 22.00 10.00 1.00
SALIDA 3.0 1.0 2.0 3.0 9.0
INGRESO -
6 1065 ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX- CLUTE PAR 320.00 - -
SALIDA -
PAPEL BOND 75G. TAMAÑO A4
INGRESO 12.0 12.0
1 0056 PAPEL BOND 75G. TAMAÑO A4 - CHAMEX MILL 39.40 - 12.00
SALIDA -
GIGANTOGRAFIA DE LONA
INGRESO 1.0 1.0
1 0060 GIGANTOGRAFIA DE LONA 13 OZ 2.40M X 3.60M UND 510.00 - -
SALIDA 1.0 1.0
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

FORMATO - 07-08
DIAGRAMA DE AVANCE FISICO PROGRAMADO-EJECUTADO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y
“Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

COSTO DIRECTO DE OBRA: S/. 1,834,283.19 CORRESPONDE AL MES: MES DE FEBRERO

TOTAL PRESUPUESTADO: S/. 2,199,325.91 PRESENTACION: 3/26/2023

PROGRAMADO EJECUTADO
ITEM PERIODO (S/.) PORCENTAJE (S/.) PORCENTAJE
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
0 INICIO 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
1 DICIEMBRE 23,116.57 23,116.57 1.26% 1.26% 0.00 0.00 0.00% 0.00%
ENERO 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
2 FEBRERO 38,184.61 61,301.18 2.08% 3.34% 16,976.48 16,976.48 0.93% 0.93%
3 MARZO 47,332.08 108,633.26 2.58% 5.92%
4 ABRIL 253,203.40 361,836.66 13.80% 19.73%
5 MAYO 296,994.68 658,831.34 16.19% 35.92%
6 JUNIO 391,390.86 1,050,222.20 21.34% 57.26%
7 JULIO 485,374.42 1,535,596.62 26.46% 83.72%
8 AGOSTO 298,686.57 1,834,283.19 16.28% 100.00%
TOTAL: 1,834,283.19 100.00% 16,976.48 0.93%

AVANCE FÍSICO ACUMULADO


(PROGRAMADO Vs. EJECUTADO)
120.00%

100.00% 100.00%

83.72%
80.00%

PROGRAMADO
57.26%
60.00%
EJECUTADO

35.92%
40.00%

19.73%
20.00%

0.00% 5.92%
3.34%
0.00% 1.26%
0.00% 0.00% 0.93%
DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO

AVANCE FISICO MENSUAL


(PROGRAMADO Vs. EJECUTADO)
30.00%
26.46%

25.00%

21.34%
20.00%
16.19% 16.28%

15.00% 13.80%

10.00%

5.00% 2.58%
0.93%
0.00% 2.08%
1.26%
0.00% 0.00%
0.00% 0.00%
0.00%
INICIO

DICIE...

ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

JULIO

AGOSTO
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

FORMATO - 08-06
DIAGRAMA DE AVANCE FINANCIERO PROGRAMADO-EJECUTADO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y
“Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”

INICIAL
COSTO DIRECTO DE OBRA: S/. 1,834,283.19 MES DE FEBRERO
CORRESPONDE AL MES:

TOTAL PRESUPUESTADO: S/. 2,199,325.91 PRESENTACION: 3/26/2023

PROGRAMADO EJECUTADO
ITEM PERIODO (S/.) PORCENTAJE (S/.) PORCENTAJE
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
0 INICIO 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
1 DICIEMBRE 90,488.60 90,488.60 4.11% 4.11% 0.00 0.00 0.00% 0.00%
ENERO 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
2 FEBRERO 78,066.14 168,554.74 3.55% 7.66% 0.00 0.00 0.00% 0.00%
3 MARZO 87,213.61 255,768.34 3.97% 11.63%
4 ABRIL 293,084.93 548,853.27 13.33% 24.96%
5 MAYO 336,876.21 885,729.48 15.32% 40.27%
6 JUNIO 431,272.38 1,317,001.86 19.61% 59.88%
7 JULIO 525,255.95 1,842,257.81 23.88% 83.76%
8 AGOSTO 357,068.10 2,199,325.91 16.24% 100.00%
TOTAL: 2,199,325.91 100.00% 0.00 0.00%

AVANCE FINANCIERO ACUMULADO


120.00% (PROGRAMADO Vs. EJECUTADO)

100.00%
100.00%

80.00% 83.76%

60.00%
59.88%

40.00%
40.27%

24.96%
20.00%

7.66% 11.63% PROGRAMADO EJECUTADO


4.11% 0.00%
0.00% 0.00%
0.00% 0.00%
DICIEMBRE

ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

JULIO

AGOSTO

AVANCE FINANCIERO MENSUAL


(PROGRAMADO Vs. EJECUTADO)
30.00%
PROGRAMADO EJECUTADO

25.00%
23.88%

20.00% 19.61%

15.32%
15.00% 16.24%
13.33%

10.00%

5.00% 4.11% 3.97%


3.55%

0.00% 0.00%
0.00%
DICIEMBRE 0.00%
ENERO 0.00%
FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO

OBSERVACION: En los graficos de avance financiero, se considera montos devengados al mes de febrero, se incluye gastos generales correspondiente a los meses de setiembre, octubre y
noviembre, sin embargo el gasto financiero en funcion a la ejecucion fisica se presenta desde el mes N° 01 (Diciembre).
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

25.1.- RESUMEN MENSUAL DE MOVIMIENTO DE EQUIPO MECANICO

OBRA: RESIDENTE : ING. WILLIAM DAVID VARGAS MUÑOZ


“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”,
“H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SUPERVISOR : ING. WILBERT RAUL HURTADO TERRAZA
SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” CORRESPONDE: FEBRERO 2023

AVANCES
PROGRAMADO SALDO
ANTERIOR ACTUAL ACUMULADO 
ITEM MOVIMIENTO DE MAQUINARIA CONDICION
Valorizado Valorizado Valorizado Valorizado
VALORIZADO % % % % %
S/. S/. S/. S/.
VEHICULOS
1 MAQUINARIA PESADA PROPIA S/ 53,344.93 51.57% S/ 0.00 0.00% S/ 925.00 1.73% S/ 925.00 1.73% S/ 52,419.93 98.27%
2 MAQUINARIA LIVIANA PROPIA S/ 46,357.38 44.82% S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00% S/ 46,357.38 100.00%
3 MAQUINARIA PESADA ALQUILADA S/ 3,733.34 3.61% S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00% S/ 3,733.34 100.00%
4 MAQUINARIA LIVIANA ALQUILADA S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00%

TOTAL 103,435.65 0.00 0.00% 925.00 0.89% 925.00 0.89% 102,510.65 99.11%
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

25.2.- MOVIMIENTO MENSUAL DE EQUIPO MECANICO


OBRA: RESIDENTE : ING. WILLIAM DAVID VARGAS MUÑOZ
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”,
“X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” SUPERVISOR : ING. WILBERT RAUL HURTADO TERRAZAS

CORRESPONDE : FEBRERO 2023


COMBUSTIBLE RENDIMIENTO
UNIDAD REG ACTIVIDAD REALIZADA
TIPO CANT P.U PARCIAL H/T GAL/HR P.U PARCIAL

CAMION VOLQUETE NISSAN WZ7499 DIESEL 5.00 23.00 115.00 5.00 1.00 40.00 200.00 TRASLADO DE DIVERSOS MATERIALES A OBRA
MAQUINARIA PESADA

CAMION VOLQUETE MERCEDES EGA-352 DIESEL 9.00 23.00 207.00 2.50 3.60 105.00 262.50 TRASLADO Y ELIMINACION DE MATERIAL DE DESMONTE

CAMION VOLQUETE VOLVO XO-8336 DIESEL 9.00 23.00 207.00 2.50 3.60 105.00 262.50 TRASLADO Y ELIMINACION DE MATERIAL DE DESMONTE
TIPO DE MAQUINARIA

RETROEXCAVADORA JCB 3CX DIESEL 2.00 23.00 46.00 2.00 1.00 100.00 200.00 CARGUIO DE DESMONTE

CANGURO COMPACTADORA GASOHOL 0.00


EQUIPOS LIVIANOS

MEZCLADORA DE CONCRETO GASOHOL 0.00

VIBRADORA DE CONCRETO GASOHOL 0.00

MOTOBOMBA GASOHOL 0.00

TOTAL MAQ. PESADA DE PROPIEDAD DE LA MDS S/. 575.00 S/. 925.00

TOTAL MAQ. PESADA ALQUILADA S/. 0.00 S/. 0.00

TOTAL EQUIPO LIVIANO S/. 0.00 S/. 0.00

TOTAL EQUIPO LIVIANO ALQUILADO S/. 0.00 S/. 0.00

TOTAL S/. 575.00 S/. 925.00


COMBUSTIBLE SERVICIO
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS

25.3.- CONTROL DIARIO DE EQUIPO MECANICO

OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y RESIDENTE : ING. WILLIAM DAVID VARGAS MUÑOZ
“Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” INSPECTOR : ING. WILBERT RAUL HURTADO TERRAZAS
CORRESPONDE : FEBRERO 2023

FECHA 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 TOTAL
UNIDAD Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DIA HORA MAQUINA COMBUSTIBLE

PETROLEO 3.00 2.00


CAMION VOLQUETE NISSAN WZ7499 5.00 5.00
MAQUINARIA PESADA

HM 3.00 2.00
PETROLEO 9.00
CAMION VOLQUETE MERCEDES EGA-352 2.50 9.00
HM 2.50
PETROLEO 9.00
CAMION VOLQUETE VOLVO XO-8336 2.50 9.00
HM 2.50
PETROLEO 2.00
RETROEXCAVADORA JCB 3CX 2.00 2.00
HM 2.00
TIPO DE MAQUINARIA

CONSUMO DE COMBUSTIBLE - PETROLEO 3.0 - - - - - - - - - - - 20.0 - - - - - - 2.0 - - - - - - - - 12.00 25.00

GASOLINA
CANGURO COMPACTADORA 0.00
HM
EQUIPOS LIVIANOS

GASOLINA
MEZCLADORA DE CONCRETO 0.00
HM
GASOLINA
VIBRADORA DE CONCRETO 0.00
HM
GASOLINA
MOTOBOMBA 0.00
HM

CONSUMO DE COMBUSTIBLE - GASOLINA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.00

NOTA: LAS HORAS SE CONSIDERA EN HORAS NO EN HORAS MINUTOS.


MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO 39.- PANEL FOTOGRAFICO
GERENCIA DE INFRAESTRUCTURA MES DE FEBRERO

TRABAJOS DE EXCAVACIÓ N DE TERRENO PARA


ZAPATAS, ASÍ COMO TAMBIÉ N EL PERFILADO DE LAS
MISMAS, DE ACUERDO A LO INDICADO EN LOS
PLANOS.

CARGUÍO DE MATERIAL EXCEDENTE


PROCEDENTE DE LA EXCAVACIÓ N DE
TERRENO PARA ZAPATAS, AL VOLQUETE
PARA ESTA SER ELIMINADA HACIA EL
BOTADERO DESIGNADO.

COLOCADO DE ROLLIZOS A TODO EL CONTORNO DEL


Á REA DE TRABAJO, PARA LUEGO SER FORRADO CON
ARPILLERA, CON FINES DE PROTEGER TANTO LOS
MATERIALES Y EVITAR ACCIDENTES CON TERCERAS
PERSONAS.
MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO 39.- PANEL FOTOGRAFICO
GERENCIA DE INFRAESTRUCTURA MES DE FEBRERO

RECEPCIÓ N DE MATERIAL AGREGADO (ARENA


GRUESA Y PIEDRA CHANCADA DE 1/2"), ESTOS
MATERIALES FUERON REVISADOS ANTES DE QUE SE
LLEVE A OBRA VERIFICANDO SEGÚ N
REQUERIMIENTO SOLICITADO

TRABAJO CON FAENANTES DE LA ZONA ASÍ


COMO LOS PADRES DE FAMILIA,
REALIZANDO LA EXCAVACIÓ N DE ZANJAS
PARA VIGAS DE CONEXIÓ N, TRASLADO DE
MATERIAL EXCEDENTE PARA SU
ELIMINACIÓ N.

ELABORACIÓ N DE CARPA PROVISIONAL PARA


ALMACENAR MATERIALES DE CONSTRUCCION
(MADERA, ACERO CORRUGADO), ASÍ COMO LA
CONSTRUCCIÓ N DE 02 CABALLETES PARA LA
HABILITACION Y ARMADO DE ESTRUCTURAS DE
ACERO (COLUMNAS, ETC.)
MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO 39.- PANEL FOTOGRAFICO
GERENCIA DE INFRAESTRUCTURA MES DE FEBRERO

TRABAJOS HABILITACION DE ACERO CORRUGADO DE


3/8" PARA USO EN ESTRIBOS DE COLUMNAS DE TIPO
C1, C2 Y C4 DE ACUERDO A LO QUE SE MUESTRA EN
LOS PLANOS, LAS CUALES SERÁ N UTILIZADAS EN EL
BLOQUE 02

TRABAJOS DE ARMADO DE COLUMNAS,


COMO ES EL AMARRADO DE ESTRIBOS
ESTOS SON DISTRIBUIDOS SEGÚ N SE
INDICA EN LOS PLANOS.

TRABAJOS DE VACIADO DE SOLADO DE PISO PARA


ZAPATAS, ASÍ COMO TAMBIÉ N EL SOLADO PARA
VIGAS DE CONEXIÓ N, SE REALIZA PREVIO NIVELADO
DE LAS ALTURAS A VACIAR CON NIVEL
TOPOGRÁ FICO, DEJÁ NDOSE PLANTILLAS.
MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO 39.- PANEL FOTOGRAFICO
GERENCIA DE INFRAESTRUCTURA MES DE FEBRERO

NIVELADO DE LA MEZCLA A LAS PLANTILLAS


COLOCADAS EN SOLADO PARA ZAPATAS ASÍ COMO
PARA LAS VIGAS DE CONEXIÓ N.

TRABAJOS DE LIMPIEZA DE DERRUMBES


EN LOS EJES F Y G HACIA LA FACHADA DEL
ESTADIO SE PRESENTO EN DOS OCASIONES
LLUVIAS LAS CUALES HICIERON COLAPSAR
LAS PAREDES DE LAS EXCAVACIONES
HECHAS.

VISITA DE LOS REGIDORES Y GERENTE DE


INFRAESTRUCTURA DE LA MUNICIPALIDAD,
VERIFICANDO LOS AVANCES DE FÍSICOS QUE SE
VIENEN REALIZANDO EN OBRA
MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO 39.- PANEL FOTOGRAFICO
GERENCIA DE INFRAESTRUCTURA MES DE FEBRERO

IZADO DE COLUMNAS PREVIO COLOCADO DE


PARRILLAS DE ACERO PARA ZAPATAS ESTAS SON
COLOCADAS MEDIANTE LOS EJES YA DEFINIDOS Y
ALINEADOS ENTREGÁ NDOSE LAS CARAS TODAS
ALINEADAS.

VACIADO DE ZAPATAS, LA DOSIFICACIÓ N


DE LA MEZCLA F'C=210 KG/CM2, ES
SUPERVISADA POR LA RESIDENCIA DE
OBRA, CONTROLANDO QUE LOS
MATERIALES SEAN DE ACUERDO A LA
DOSIFICACION DEL DISEÑ O DE MEZCLAS

IZADO DE COLUMNAS, PARA SU POSTERIOR VACIADO


DE ZAPATAS DE CONCRETO F'C=210 KG/CM2