PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION COSTO DIRECTO ANTERIOR ACTUAL ACUMULADO
S/. Valorizado S/. % Valorizado S/. % Valorizado S/. % Valorizado S/. %
PROGRAMADO 2,336,335.11 1,051,350.80 45.00% 584,083.78 25.00% 1,635,434.58 70.00% #NAME? #NAME?
1 COSTO DIRECTO 2,336,335.11 156,908.15 6.72% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
COSTO DIRECTO TOTAL 2,336,335.11 156,908.15 6.72% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
GASTOS GENERALES 13.31% 310,911.61 20,880.81 #NAME? #NAME? #NAME?
GASTOS DE INSPECCION 4.09% 95,466.70 6,411.54 #NAME? #NAME? #NAME?
EXPEDIENTE TECNICO 1.50% 35,014.78 35,000.00 - 35,000.00 14.78
Err:509 Err:509 Err:509 - - - Err:509
COSTO TOTAL Err:509 219,200.50 Err:509 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
PROYECTO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD
PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”,
“R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE
CUSCO – DEPARTAMENTO DE CUSCO”
INFORME MENSUAL
AVANCE FISICO -
FINANCIERO MES DE
FEBRERO
2023
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
PROYECTO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD
PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”,
“R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE
CUSCO – DEPARTAMENTO DE CUSCO”
INFORME MENSUAL
AVANCE FISICO -
FINANCIERO MES DE
FEBRERO
2023
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
PROYECTO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD
PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”,
“R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE
CUSCO – DEPARTAMENTO DE CUSCO”
INFORME MENSUAL
AVANCE FISICO -
FINANCIERO MES DE
FEBRERO
2023
-
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
CONTENIDO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
A. DATOS
ACTUALIZADOS DE LA
OBRA
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
B. FICHA TECNICA
RESUMEN
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
D.- RECURSOS
UTILIZADOS
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.1.- RESUMEN DE
VALORIZACION
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.2.- VALORIZADO DE
OBRA PRINCIPAL
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.3.- VALORIZACION
MAYORES METRADOS
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.4.- VALORIZACION
PARTIDAS NUEVAS
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.5.- VALORIZACION DE
PARTIDAS NUEVAS 02
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.6.- VALORIZACION
DEDUCTIVOS
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.8.- HOJA DE
METRADOS DE
PROGRAMADO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.10.- HOJA DE
METRADOS DE MAYORES
METRADOS
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.12.- HOJA DE
METRADOS DE PARTIDAS
NUEVAS
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
23.- AVANCE
FINANCIERO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
23.2.- RESUMEN
MENSUAL DE GASTOS
POR ESPECIFICA
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
23.3.- MANIFIESTO DE
GASTO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
24. MOVIMIENTO DE
ALMACEN
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
24.1.- RESUMEN DE
MOVIMIENTO DE
ALMACEN
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
24.2.- MOVIMIENTO
MENSUAL DE ALMACEN
VALORIZADO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
24.3.- CONTROL DE
MOVIMIENTO DIARIO DE
ALMACEN
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
25.MOVIMIENTO DE
EQUIPO MECANICO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
25.1.- RESUMEN
MENSUAL DE EQUIPO
MECANICO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
25.2.-MOVIMIENTO
MENSUAL DE EQUIPO
MECANICO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
25.3.-CONTROL DIARIO
DE EQUIPO MECANICO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
26.-PANEL FOTOGRÁFICO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
27.-CONTROL DE
CALIDAD
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
28.-ANEXOS
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
28.1.- COPIAS DE
CUADERNO DE OBRA
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
28.5.- S.S.O.M.A
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.14.- HOJA DE
METRADOS DE
PARTIDAS NUEVAS 02
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.15.- CRONOGRAMA
COMPARADO
PROYECTADO VS
EJECUTADO
MES: FEBRERO
MUNICIPALIDAD DISTRITAL DE
SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
“Año de la unidad, la paz y el desarrollo”
22.16.- TAREO DE
PERSONAL
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
CONTENIDO
MES DE FEBRERO
Nº DESCRIPCIÓN CONTROL
CARATULA P
CONTENIDO P
A DATOS ACTUALIZADOS DE OBRA P
B FICHA TECNICA RESUMEN P
C ASPECTOS TECNICOS DE OBRA P
D RECURSOS UTLIZADOS P
E RESUMEN DE OBRA P
22 AVANCE FÍSICO - VALORIZACIÓN DE OBRA
22.1 RESUMEN DE VALORIZACIONES P
22.2 VALORIZACION OBRA PRINCIPAL P
22.3 VALORIZACION MAYORES METRADOS X
22.4 VALORIZACION PARTIDAS NUEVAS X
22.5 VALORIZACION PARTIDAS NUEVAS 02 X
22.6 VALORIZACION DE DEDUCTIVO X
22.7 RESUMEN HOJA DE METRADOS X
22.8 HOJA DE METRADOS P
22.9 RESUMEN HOJA DE METRADOS DE MAYORES METRADOS X
22.10 HOJA DE METRADOS DE MAYORES METRADOS X
22.11 RESUMEN HOJA DE METRADOS DE PARTIDAS NUEVAS X
22.12 HOJA DE METRADOS DE PARTIDAS NUEVAS X
22.13 RESUMEN HOJA DE METRADOS DE PARTIDAS NUEVAS 02 X
22.14 HOJA DE METRADOS DE PARTIDAS NUEVAS 02 X
22.15 CRONOGRAMA COMPARADO PROYECTADO VS EJECUTADO P
22.16 TAREO DE PERSONAL P
23 AVANCE FINANCIERO
23.1 RESUMEN ANUAL DE GASTOS POR ESPECIFICA P
23.2 RESUMEN MENSUAL DE GASTOS POR ESPECIFICA P
23.4 MANIFIESTO DE GASTO P
24 MOVIMIENTO DE ALMACEN
24.1 RESUMEN DE MOVIMIENTO DE ALMACEN P
24.2 MOVIMIENTO MENSUAL DE ALMACEN VALORIZADO P
24.3 CONTROL DE MOVIMIENTO DIARIO DE ALMACEN P
25 MOVIMIENTO DE EQUIPO MECANICO
25.1 RESUMEN MENSUAL DE EQUIPO MECANICO P
25.2 MOVIMIENTO MENSUAL DE EQUIPO MECANICO P
25.3 CONTROL DIARIO DE EQUIPO MECANICO P
26 PANEL FOTOGRÁFICO P
27 CONTROL DE CALIDAD X
28 ANEXOS
28.1 COPIAS DE CUADERNO DE OBRA P
28.2 COPIAS DE PARTE DIARIO DE MAQUINARIA P
28.3 COPIAS DE NOTAS DE ENTRADA DE ALMACEN P
28.4 COPIAS DE NOTA DE SALIDA DE ALMACEN P
P= Presentó N= No presentó X= No corresponde
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
INFORME DE MENSUAL
Febrero - 2023
ADMINISTRACIÓN DIRECTA
FOTO DE LA OBRA
CÓDIGO 2498152
META SIAF 0034
12 COMPONENTE
13 FINALIDAD
14 META SIAF 2,021 0054
15 FUENTE DE FINANCIAMIENTO CANON Y SOBRECANON
16 ENTREGA DE TERRENO 15 de noviembre de 2022
17 INICIO DE OBRA 1 de diciembre de 2022
18 FECHA DE CORTE DE OBRA 31 de diciembre de 2022
19 FECHA DE REINICIO DE OBRA 1 de febrero de 2023
20 TIEMPO PROGRAMADO 240 días calendario
21 Plazo Para Culmminacion de la Obra 29 de agosto de 2023
26 MODALIDAD DE EJECUCION EJECUCIÓN PRESUPUESTARIA DIRECTA
Página 53
-
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
DATOS DE LA OBRA
1 NOMBRE DEL PROYECTO “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”,
“H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO
DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
2 UNIDAD EJECUTORA
Unidad Ejecutora : MUNICIPALIDAD DISTRITAL DE SANTIAGO
3 SECUENCIA FUNCIONAL
Funció n 15 TRANSPORTE
Programa 036 TRANSPORTE URBANO
Sub Programa 0074 VIAS URBANAS
Meta SIAF 2,020 0054
4 UBICACIÓN
Region CUSCO
Provincia CUSCO
Distrito SANTIAGO
Region Geografica SIERRA
Altitud 3,578 m.s.n.m
RESIDENTE DE OBRA
Nombre: ING. WILLIAM DAVID VARGAS MUÑ OZ
Especialidad: Ingeniero civil C.I.P.: 203147
DNI: 45615781
INSPECTOR DE OBRA
Nombre: ING. WILBERT RAUL HURTADO TERRAZAS
Especialidad: Ingeniero Civil C.I.P.: 66706
DNI: 23857836
7 MODALIDAD EJECUCIÓN
Modalidad de Ejecució n EJECUCIÓ N PRESUPUESTARIA DIRECTA
8 FUENTE DE FINANCIAMIENTO
Fuente de Financiamiento CANON Y SOBRECANON
9 PRESUPUESTO APROBADO
10 VALORIZACION FISICA
VALORIZACION
DESCRIPCIÓN
ANTERIOR % ACTUAL % ACUMULADA %
OBRA PRINCIPAL - 0.00% 16,976.48 0.93% 16,976.48 0.93%
-
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBSERVACION:
El Proyecto inicia con la ejecucion fisica el 01 de Diciembre del 2022, dicha fecha se constata en el acta de inicio de ejecucion, como tambien en el
asisento N° 001 del cuaderno de Obra. Se presenta la primera paralizacion por cierre de a ñ o fiscal y cambio de gestion el dia 31 de Diciembre del
2022, dicha paralizacion se constata en el cuaderno de obra, asiento N°051.
Se Registra el reinicio de obra en fecha 01 de frebrero del 2023, posterior a la autorizacion de Plan de Monitoreo Arqueologico, dicho reinicio se
pone constancia en el cuaderno de obra, asiento N°052.
Se pone en conocimiento la falta de atencion de diversos requerimientos por parte de la oficina de abastecimientos de la MDS. Los cuales deberan
agilizarse con el objetivo de abastecer con insumos y/o Bienes y servicios al proyecto, de esa forma no afectar a la programacion de las metas para
el presente añ o.
Objetivo de la Obra
El objetivo principal es alcanzar los fines que propone el proyecto: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”,
“C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE
CUSCO”
C. ASPECTOS TECNICOS
MES DE FEBRERO
C ASPECTOS TECNICOS
A. OBJETIVOS GENERAL
El objetivo central es alcanzar los fines que propone el proyecto, para las siguientes intervenciones:
- Mejorar el flujo del transito peatonal de las 14 calles.
- Mantener la accesibilidad de las vías peatonales en temporadas de lluvias.
- Mejorar el equipamiento vial del Distrito de Santiago.
- Mejorar las condiciones de vida de los usuarios beneficiados, evitando los problemas de transitabilidad
peatonal.
B. OBJETIVOS ESPECIFICOS
- Adecuada infraestructura peatonal.
- Adecuado equipamiento y acondicionamiento urbano.
- Adecuada estabilizació n de taludes.
- Adecuada evacuació n de aguas pluviales.
- Adecuado ornato y á reas verdes.
16 DOCUMENTACIÓN ADMINISTRATIVA
CUADERNO DE OBRA
DESCRIPCIÓN DOCUMENTO NÚMERO FECHA
Entrega de Terreno Acta/cuaderno de obra S/N 15/11/2022
Inicio de Obra Acta/cuaderno de obra S/N 01/12/2022
Cuaderno de Obra Vol. I Legalizació n S/N 05/11/2022
Cuaderno de Obra Vol. II Legalizació n S/N -
-
D. RECURSOS UTILIZADOS
MES DE FEBRERO
17 RECURSOS UTILIZADOS
CANTIDAD (UND)
DESCRIPCION
Diciembre Enero Febrero Marzo Abril Mayo Junio Julio Agosto Setiembre Octubre
MAQUINARIA PESADA
Tractor sobre orugas
Cargador Frontal
Retroexcavadora 1
Motoniveladora
Rodillo Liso Vib. Autoport.
Compresora Neumá tica
VEHICULOS
Camió n Volquete 2
Camió n Cisterna
Camió n Canter 2
Camioneta
moto lineal
MAQUINARIA LIVIANA
Mezcladora
Vibradora
Ganguro Compactadora
Motobomba
Wincha
EQUIPO DE TOPOGRAFIA
Teodolito
Nivel Topográ fico
Estació n Total
Mira Topográ fica
Jalones
TOTAL 0 0 5 0 0 0 0 0 0 0 0
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
18 EJECUCIÓN FÍSICA
VALORIZACION FINANCIERO:
VALORIZACION
DESCRIPCION SALDO
PROGRAMADO ANTERIOR ACTUAL ACUMULADO
OBRA PRINCIPAL 2,199,325.91 - 100.00 S/ 100.00 2,199,225.91
*
La entidad ha indicado a los ejecutores de la obra que el presupuesto asignado para el presente añ o es de s/. 3,000,000.00 tal cual figuraba en el PIA, motivo por el cual las
metas fisicas del añ o 2022 estan basadas a ese monto asignado inicialmente, Pero sin aviso y sin cordinacion el area de planificacion de la entidad ha asignado en febrero un
presupuesto de s/ 6,000,000.00 y a mediados de marzo ha retirado s/ 500,000.00, pero consultando con la gerencia de Infraestructura nos indican que debemos mantener
nuestra programacion fisica con 3,000,000.00, este hecho refleja una falta de coordinacion entre el area de planificacion y la gerencia de obras. Por tal motivo la residencia y
la supervision de ala obra deslindan cualquier controversia con relacion a la ley de contrataciones y normas de planificacion en obras por administracion directa que se
podrian generar en el presente proyecto.
* Se indica que tambien se tiene limitaciones por el transito vehicular que existen en a zona del proyecto ls cuales se informara a la unidad de transporte para cerrar el tramo
de intervencion y dar una alternativa.
*
Se indica que existe limitaciones por problemas sociales, debido a que los usuarios del tramo en intervencion generan conflictos por la construcciones de
veredas en sus limites de propiedad afectando al ancho de la via planteada en el proyecto.
MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO
GERENCIA DE INFRAESTRUCTURA
PROYECTO:
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”,
“D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE
CUSCO”
Residente de Obra : ING. WILLIAM DAVID VARGAS MUÑ OZ
Inspector de Obra : ING. WILBERT RAUL HURTADO TERRAZAS
2018
GERENCIA DE INFRAESTRUCTURA
PROYECTO:
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”,
“D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE
CUSCO”
Residente de Obra : ING. WILLIAM DAVID VARGAS MUÑ OZ
Inspector de Obra : ING. WILBERT RAUL HURTADO TERRAZAS
2018
GERENCIA DE INFRAESTRUCTURA
PROYECTO:
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”,
“D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE
CUSCO”
Residente de Obra : ING. WILLIAM DAVID VARGAS MUÑ OZ
Inspector de Obra : ING. WILBERT RAUL HURTADO TERRAZAS
2018
GOBIERNO REGIONAL CUSCO EJECUCION FINANCIERA
GERENCIA REGIONAL DE INFRAESTRUCTURA
Sub Gerencia de Obras
GASTO GASTO
MES SALDO
PROGRAMADO EJECUTADO
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SETIEMBRE
OCTUBRE 165,235.51 27.86% 146,901.89 25.42% 18,333.62
NOVIEMBRE
DICIEMBRE
TOTAL 165,235.51 27.86% 146,901.89 25.42% 18,333.62
MODIFICACIONES DE OBRA
OBRA PRINCIPAL TOTAL GENERAL
AÑO MES MAYORES METRADOS PART. NUEVAS / OBRA COMPLEM. DEDUCTIVOS
PROGRAMADO ACUM PROG EJEC ANTER EJEC DE MES EJEC ACUM MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL
JUNIO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
JULIO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
AGOSTO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
SEPTIEMBRE #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
OCTUBRE #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
NOVIEMBRE #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
DICIEMBRE #REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509
MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO
“AMPLIACION Y MEJORAMIENTO DE LA DEFENSA RIBEREÑA EN LA MARGEN IZQUIERDA DEL RIO MAPACHO SECTORES MIRAFLORES-SAN ISIDRO, DISTRITO DE PAUCARTAMBO, PAUCARTAMBO – CUSCO”.
CRONOGRAMA VALORIZADA DE OBRA
MES NOV - 2012 MES DIC - 2012 MES ENE - 2013 MES FEB - 2013 MES MAR - 2013 MES ABR - 2013 MES MAY - 2013 MES JUN - 2013
ITEM DESCRIPCION UND. METRADO PRESIO (S/.) PARCIAL (S/.)
PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA 7 60mX3 60m udn 1.00 638.80 S/. 638.80
01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2 120.00 119.66 S/. 14,359.20
02 TRABAJOS PRELIMINARES
02.01 TRANSPORTE DE EQUIPO MAQUINARIA Y MATERIALES
02.01.01 TRANSPORTE DE MATERIALES DE OBRA GLB 1.65 2,500.00 S/. 4,125.00 4,125.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.01.02 TRANSPORTE DE MATERIALES DE OBRA GLB 1.63 1,500.00 S/. 2,445.00 2,445.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.02 DEMOLICIONES
02.02.01 DESMONTAJE DE MALLA DE GAVIONES m 2,375.52 4.47 S/. 10,618.57 10,618.57 100.00% S/. 0.00 0.00% S/. 0.00 0.00% 0 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 ML) m3 3,088.18 31.59 S/. 97,555.61 97,555.61 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.02.03 ELIMINACION DE DESMONTE CON MAQUINARIA D=5KM m3 3,088.18 19.33 S/. 59,694.52 59,694.52 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.03 LIMPIEZA DEL TERRENO
02.03.01 LIMPIEZA DE TERRENO MANUAL m2 2,865.82 2.53 S/. 7,250.52 7,250.52 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.03.02 LIMPIEZA PERMANENTE DE OBRA m2 2,800.82 1.58 S/. 4,425.30 4,425.30 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.04 TRAZO, NIVELES Y REPLANTEO
02.04.01 TRAZO, NIVELES Y REPLANTEO PRELIMINARL m2 3,152.32 1.15 S/. 3,625.17 3,625.17 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
02.04.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJECUCION DE OBRA m2 3,152.32 0.57 S/. 1,796.82 1,796.82 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION MASIVA A MAQUINARIA EN TERRENO NORMAL C/RETROm3 5Y3 17,917.67 17.02 S/. 304,958.74 304,958.74 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
03.02 REFINE Y CONFORMACION DE ZANJAS m2 1,886.50 0.79 S/. 1,490.34 1,490.34 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
03.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO m3 9,346.60 16.99 S/. 158,798.73 158,798.73 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
03.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=5KM m3 9,518.79 20.67 S/. 196,753.39 196,753.39 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
04 OBRAS DE CONCRETO SIMPLE
04.01 MURO DE CONCRETO CICLOPEO
04.01.01 CONCRETO CICLOPEO FC=140 KG/CM2 +70 % PM EN MURO DE CONTm3 9,986.74 254.40 S/. 2,540,626.66 2,540,626.66 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
04.01.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENSION m2 7,574.83 34.93 S/. 264,588.81 264,588.81 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
04.01.03 ENBOQUILLADO DE PIEDRA m3 124.72 14.12 S/. 1,761.05 1,761.05 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
04.01.04 GEOTEXTIL m2 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
05 CONTROL DE CALIDAD
05.01 DISEÑO DE MEZCLA DE CONCRETO Und 1.00 500.00 S/. 500.00 500.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
05.02 ROTURA DE BRIQUETAS Und 20.00 35.00 S/. 700.00 700.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
05.03 ENSAYO DE DENSIDAD DE CAMPO Und 5.00 35.00 S/. 175.00 175.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
06 PLACA RECORDATORIO
06.01 DISEÑO DE MEZCLA DE CONCRETO Und 1.00 883.46 S/. 883.46 883.46 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07 IMPACTO AMBIENTAL
07.01 LIMPIEZA GENERAL DE OBRA m2 600.00 7.26 S/. 4,356.00 4,356.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07.02 ELIMINACION DE DESMONTE CON MAQUINARIA D=5KM m3 156.00 19.33 S/. 3,015.48 3,015.48 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07.03 REFORESTACION DE ORILLAS Y LADERAS HA 0.79 2,500.00 S/. 1,975.00 1,975.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07.04 REPOSICION DE AREAS AFECTADAS HA 0.40 5,000.00 S/. 2,000.00 2,000.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
07.05 RECUPERACJON DE AREAS OCUPADAS m2 0.20 52.95 S/. 10.59 10.59 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
08 GAVIONES DE PROTECCION
08.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.02 EXCAVACION MASIVA A MAQUINARIA EN TERRENO m3 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.03 PERFILADO Y COMPACTADO CON EQUIPO m2 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.04 RELLENO CON MATERIAL PROPIO CON EQUIPO m3 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=5KM m3 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.06 GEOTEXTIL m2 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.07 ACARREO DE PIEDRA MEDIANA DE RELLENO D=5KM m3 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.08 ARMADO Y LLENADO DE CAJA DE GAVION DE 1.00X0.30X2.00m (tipo Und 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
08.09 PERFILADO Y COSIDO DE TAPAS DE GAVIONES Und 0.00 0.00 S/. - 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0! S/. 0.00 #DIV/0!
09 CAPACITACION
09.01 CONSERVACIÓN DE DEFENSA RIVEREÑA GLB 1.00 7,000.00 S/. 7,000.00 7,000.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
09.02 EDUCACION Y CUIDADO AMBIENTAL GLB 1.00 5,000.00 S/. 5,000.00 5,000.00 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
10 OTROS
10.01 EXTRACCION DE AGUA PARA CIMENTACION Dia 140.00 414.76 S/. 58,066.40 58,066.40 100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
TOTAL S/. 3,759,194.15 S/. 3,744,196.16 99.60% S/. - 0.00% S/. 0.00 0.00% S/. - 0.00% S/. - 0.00% S/. - 0.00% S/. - 0.00% S/. - #DIV/0!
GASTOS GENERALES 8.22% S/. 308,849.18 S/. 307,616.97 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE SUPERVISION 2.10% S/. 79,062.13 S/. 78,746.70 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE LIQUIDACION 1.09% S/. 40,883.15 S/. 16,000.00 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE EXPEDIENTE TECNICO 2.70% S/. 101,389.55 S/. 100,985.04 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
TOTAL S/. 4,289,378.16 S/. 4,247,544.88 S/. 0.01 S/. 0.01 S/. 0.01 S/. - S/. - S/. - S/. -
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
Función : 15 TRANSPORTE
Programa : 036 TRANSPORTE URBANO Monto Programado S/. 2,199,325.91
Sub Programa : 0074 VIAS URBANAS Monto Asignado 2023 S/. 1,900,000.00
Meta : 0054 Fecha de Presentación 26 de marzo de 2023
PROYECTO :
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
PRESUPUESTO AVANCES
COSTO DIRECTO SALDO
ITEM DESCRIPCION MODIFICADO ANTERIOR ACTUAL ACUMULADO
S/. % Valorizado S/. % Valorizado S/. % Valorizado S/. % Valorizado S/. %
1 PRESUPUESTO APROBADO 1,834,283.19 - 0.00% 16,976.48 0.93% 16,976.48 0.93% 1,817,306.71 99.07%
2 MAYORES METRADOS - - 0.00% - 0.00% - 0.00% 0.00 0.00%
3 PARTIDAS NUEVAS - - 0.00% - 0.00% - 0.00% 0.00 0.00%
4 DEDUCTIVOS - - 0.00% - 0.00% - 0.00% 0.00 0.00%
COSTO DIRECTO TOTAL 1,834,283.19 - 0.00% 16,976.48 0.93% 16,976.48 0.93% 1,817,306.71 99.07%
GASTOS GENERALES 13.31% 244,100.23 13.31% 50,972.18 20.88% - 0.00% 50,972.18 20.88% 193,128.05 79.12%
GASTOS DE INSPECCION 4.09% 74,951.99 4.09% - 0.00% - 0.00% - 0.00% 74,951.99 100.00%
LIQUIDACION DE OBRA 1.01% 18,500.00 1.01% - 0.00% - 0.00% - 0.00% 18,500.00 100.00%
EXPEDIENTE TECNICO 1.50% 27,490.50 1.50% 27,490.50 100.00% - 0.00% 27,490.50 100.00% - 0.00%
COSTO TOTAL 2,199,325.91 78,462.68 3.57% 16,976.48 0.77% 95,439.16 4.34% 2,103,886.75 95.66%
Página 65
FORMATO - 13
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO
DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS
01.02.01.02 TRAZO Y REEPLAMTEO PRELIMINAR KM 1.32 452.65 597.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.32 597.50 100.00%
01.02.01.03 CONTROL TOPOOGRAFICO DURANTE LA EJECUCION ML 1323.31 0.85 1,124.81 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1323.31 1,124.81 100.00%
01.02.01.04 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 487.54 10.73 5,231.30 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 487.54 5,231.30 100.00%
01.02.01.05
EXCAVACION MANUAL ZANJA EN ROCA SUELTA: PERFORACION Y VOLADURA
M3 33.37 24.40 814.23 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 33.37 814.23 100.00%
01.02.01.07 LIMPIEZA DE MATERIAL RESULTANTE DE LA VOLADURA M3 68.27 12.90 880.68 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 68.27 880.68 100.00%
01.02.01.08 REFINE Y NIVELACION FONDO ZANJA EN MATERIAL COMPACTO ML 1218.86 0.28 341.28 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1218.86 341.28 100.00%
01.02.01.09 REFINE Y NIVELACION FONDO ZANJA EN ROCA SUELTA ML 84.34 0.78 65.79 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 84.34 65.79 100.00%
01.02.01.10 REFINE Y NIVELACION FONDO ZANJA EN ROCA FIJA ML 52.21 1.18 61.61 0.00 0.00 0.00% 444.21 524.17 850.82% 444.21 524.17 ### -392.00 -462.56 -750.81%
01.02.01.11 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 66.17 6.44 426.13 0.00 0.00 0.00% 30.00 193.20 45.34% 30.00 193.20 45.34% 36.17 232.93 54.66%
01.02.01.12 RELLENO COMPACTO CON MATERIAL SELECCIONADO M3 238.20 11.45 2,727.39 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 238.20 2,727.39 100.00%
01.02.01.13 RELLENO COMPACTO CON MATERIAL PROPIO M3 486.32 5.81 2,825.52 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 486.32 2,825.52 100.00%
01.02.01.14 SUMINISTRO E INSTALACION TUB.PVC SAP Q 1.5" C-10 ML 1022.08 7.80 7,972.22 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1022.08 7,972.22 100.00%
01.02.01.14 SUMINISTRO E INSTALACION TUB.PVC SAP Q 1.5" C-10 ML 1022.08 7.80 7,972.22 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1022.08 7,972.22 100.00%
01.02.01.15 SUMINISTRO E INSTALACION TUB.PVC Q 1" C-10 ML 367.40 4.07 1,495.32 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 367.40 1,495.32 100.00%
01.02.01.16 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 193.98 193.98 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 193.98 100.00%
01.02.01.17 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 1323.31 0.45 595.49 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1323.31 595.49 100.00%
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS
0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
COSTO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 ###
0.00%
TOTAL VALORIZADO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
6990
#REF!
GOBIERNO REGIONAL CUSCO
GERENCIA REGIONAL DE INFRAESTRUCTURA
AVANCE MENSUAL
Sub Gerencia de Obras
ITEMS DESCRIPCION PARTIDA ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ACUMUL
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
GOBIERNO REGIONAL CUSCO
GERENCIA REGIONAL DE INFRAESTRUCTURA
AVANCE MENSUAL
Sub Gerencia de Obras
ITEMS DESCRIPCION PARTIDA ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ACUMUL
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
PARTIDAS EJECUTADAS #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #REF!
METRADOS DIARIOS DE PARTIDAS NUEVAS
OBRA : “CREACIÓN DEL SISTEMA DE RIEGO POR ASPERSIÓN EN LA COMUNIDAD CAMPESINA DE HUAYNAPATA ALTA DEL DISTRITO DE
PAUCARTAMBO - PROVINCIA DE PAUCARTAMBO - DEPARTAMENTO DE CUSCO”.
TOTAL
MES
CANT.
0.00
28.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MUNICIPALIDAD
PROVINCIAL DE FORMATO - 13
PAUCARTAMBO
GERENCIA DE INFRAESTRUCTURA
5.2.- VALORIZACION PARTIDAS NUEVAS
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, RESIDENTE ING. WILLIAM DAVID VARGAS MUÑOZ
“S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO
– DEPARTAMENTO DE CUSCO” SUPERVISOR ING. WILBERT RAUL HURTADO TERRAZAS
M3 0.00 0.00 #DIV/0! 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
M3 0.00 0.00 #DIV/0! 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
COSTO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
TOTAL VALORIZADO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
Página 103
AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
01 ADECUADA INFRAESTRUCTURA PEATONAL
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA 3.60x2.40 m und 1.00 - - 1.00
01.01.02 ALMACEN DE OBRA,OFICINA,GUARDIANIA m2 100.00 - - 100.00
01.01.03 ALQUILER DE AMBIENTES PARA OFICINAS mes 8.00 - - 8.00
01.02 TRABAJOS PRELIMINARES - - -
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 - - 1.00
01.02.02 TRANSPORTE DE MATERIALES CUSCO-OBRA glb 1.00 - - 1.00
01.02.03 TRAZO, NIVELES Y REPLANTEO m2 5,916.98 - - 5,916.98
01.02.04 DEMOLICION DE ESTRUCTURAS DE CONCRETO m2 83.74 - - 83.74
ELIMINACION DE MATERIAL EXCEDENTE CON
01.02.05 m3 16.75 - - 16.75
MAQUINARIA D=10 km
01.02.06 LIMPIEZA GENERAL m2 5,916.98 - - 5,916.98
01.02.07 SEÑALIZACION DE SEGURIDAD glb 20.00 - - 20.00
01.03 CONSTRUCCION DE ESCALINATAS - - -
01.03.01 TRAZO, NIVELES Y REPLANTEO m2 2,031.34 - - 2,031.34
01.03.02 CORTE DE MATERIAL SUELTO CON EQUIPO m3 1,909.16 - - 1,909.16
AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
01.06.04 SOLADO e=2" MEZCLA 1;12 m2 648.84 - - 648.84
ENCOFRADO Y DESENCOFRADO DE CUNETA (Hmax =
01.06.05 m2 1,108.88 - - 1,108.88
30 cm.)
01.06.06 CONCRETO f'c=175 kg/cm2, PARA SARDINELES m3 129.77 - - 129.77
01.06.07 TARRAJEO CON IMPERMEABILIZANTE m2 973.26 - - 973.26
01.06.08 CURADO DE CONCRETO EN VEREDAS m 1,622.10 - - 1,622.10
01.06.09 SELLADO DE JUNTAS PARA VEREDAS m 744.80 - - 744.80
01.07 PAVIMENTOS - - -
01.07.01 SUB BASE e = 0.20 m - - -
01.07.01.0 TRAZO, NIVELES Y REPLANTEO m2 770.75 - - 770.75
01.07.01.0 MATERIAL GRANULAR PARA SUB BASE m3 154.15 - - 154.15
EXTENDIDO Y COMPACTADO DE MATERIAL DE LA
01.07.01.0 m2 770.75 - - 770.75
SUB BASE
01.07.01.0 RIEGO m2 770.75 - - 770.75
01.07.02 BASE e = 0.30 m - - -
01.07.02.0 TRAZO, NIVELES Y REPLANTEO m2 770.75 - - 770.75
01.07.02.0 MATERIAL GRANULAR PARA BASE m3 231.23 - - 231.23
EXTENDIDO Y COMPACTADO DE MATERIAL DE LA
01.07.02.0 m2 770.75 - - 770.75
BASE
01.07.02.0 RIEGO m2 770.75 - - 770.75
01.07.03 LOSA DE RODADURA - - -
01.07.03.0 TRAZO, NIVELES Y REPLANTEO m2 770.75 - - 770.75
ENCOFRADO Y DESENCOFRADO LOSA DE
01.07.03.0 m2 437.40 - - 437.40
CONCRETO
01.07.03.0 CONCRETO F'c = 210 KG/CM2 (PREMEZCLADO) m3 154.15 - - 154.15
01.07.03.0 FIBRA DE ACERO (REFUERZO CONCRETO) m3 154.15 - - 154.15
ACERO CORRUGADO 3/4" Fy = 4200 kg/cm2 Gª 60
01.07.03.0 kg 883.01
(JUNTA TRANSVERSAL) - - 883.01
SELLADO DE JUNTAS DE DILATACION e = 3/4", h =
01.07.03.0 m 215.50 - - 215.50
0.05 m
01.07.03.0 CURADO DE LOSA DE CONCRETO m2 770.75 - - 770.75
01.08 MUROS DE CONCRETO CICLOPEO - - -
01.08.01 LIMPIEZA DE OBRA m2 702.92 - - 702.92
01.08.02 TRAZO, NIVELES Y REPLANTEO m2 702.92 - - 702.92
01.08.03 EXCAVACION MANUAL DE TERRENO m3 1,404.73 - - 1,404.73
01.08.04 NIVELACION Y COMPACTADO MANUAL m2 702.92 - - 702.92
01.08.05 SOLADO DE 2" MEZCLA 1:12 m2 702.92 - - 702.92
ENCOFRADO Y DESENCOFRADO DE MUROS DE
01.08.06 m2 2,387.73 - - 2,387.73
SOSTENIMIENTO
01.08.07 CONCRETO F'C= 175 KG/CM +30% DE P.M m3 458.25 - - 458.25
01.08.08 DRENES DE PVC Ø=3" m 393.20 - - 393.20
01.08.09 JUNTA DE DILATACION PARA MUROS 1"x0.05 m 1:4 m 159.50 - - 159.50
01.08.10 CURADO DE CONCRETO m2 2,387.73 - - 2,387.73
RELLENO Y COMPACTADO EN ZANJA CON MATERIAL
01.08.11 m3 755.19 - - 755.19
PROPIO
01.08.12 ACARREO MANUAL D = 25 m m3 844.42 - - 844.42
ELIMINACION DE MATERIAL EXCEDENTE CON
01.08.13 m3 844.42 - - 844.42
MAQUINARIA D=10 km
01.09 SEÑALETICA - - -
01.09.01 SEÑALIZACION HORIZONTAL - - -
01.09.01.0 PINTADO DE SARDINELES m2 438.40 - - 438.40
SEÑALIZACION HORIZONTAL EN CRUCERO
01.09.01.0 m2 21.00 - - 21.00
PEATONAL
01.09.02 SEÑALIZACION VERTICAL - - -
Página 105
AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
01.09.02.0 SEÑALIZACION INFORMATIVA DE CALLES und 32.00 - - 32.00
02.04.01 SUMIDEROS - - -
02.04.01.0 TRAZO, NIVELES Y REPLANTEO m2 44.70 - - 44.70
02.04.01.0 EXCAVACION MANUAL m3 24.59 - - 24.59
02.04.01.0 NIVELACION Y COMPACTADO MANUAL m2 44.70 - - 44.70
02.04.01.0 ACARREO MANUAL D = 25 m m3 31.96 - - 31.96
ELIMINACION DE MATERIAL EXCEDENTE CON
02.04.01.0 m3 31.96 - - 31.96
MAQUINARIA D=10 km
02.04.01.0 SOLADOS PARA SUMIDEROS F'c = 100 KG/CM2 e = 2" m2 44.70 - - 44.70
AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
02.04.02.0 NIVELACION Y COMPACTADO MANUAL m2 50.40 - - 50.40
02.04.02.0 CAMA DE ARENA PARA APOYO DE TUBERIA m 50.40 - - 50.40
SUMINISTRO Y COLOCACION DE TUBERIA PVC U
02.04.02.0 m 63.00 - - 63.00
200 mm SN-4 C/ANILLO NTP ISO 4435
RELLENO Y COMPACTADO EN ZANJA CON
02.04.02.0 m3 30.24 - - 30.24
MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON
02.04.02.0 m3 6.55 - - 6.55
MAQUINARIA D=10 km
02.05 REHUBICACION DE POSTES - - -
02.05.01 REUBICACION DE POSTES glb 5.00 - - 5.00
03 MITIGACION DE IMPACTOS CULTURALES - - -
03.01 PLAN DE MONITOREO ARQUEOLOGICO - - -
03.01.01 APROBACION DE EXPEDIENTE DE PMA - - -
APROBACION DEL PLAN DE MONITOREO
03.01.01.0 Exp 1.00 1.00 1.00 1.00 -
ARQUEOLOGICO
03.01.02 SEGURIDAD Y SALUD - - -
03.01.02.0 SEÑALIZACION TEMPORAL EN EL TRABAJO m 1,677.00 - - 1,677.00
03.01.03 CONTROL Y MONITOREO ARQUEOLOGICO - - -
03.01.03.0 CHARLA DE INDUCCIÓN Cha 3.00 - - 3.00
03.01.03.0 MONITOREO DE ZANJAS m3 3,603.00 33.93 63.96 41.34 22.23 17.55 15.60 14.04 21.45 25.35 14.04 10.53 28.08 42.12 25.35 35.88 17.16 8.58 7.02 444.21 444.21 3,158.79
03.01.03.0 RECUPERACIÓN DEL MATERIAL ARQUEOLÓGICO bol 5.00 - - 5.00
03.01.04 REGISTRO ARQUEOLOGICO - - -
03.01.04.0 REGISTRO FOTOGRAFICO und 200.00 - - 200.00
REGISTRO GRAFICO ARQUEOLOGICO (PLANTAS,
03.01.04.0 Lam 150.00 - - 150.00
PERFILES)
03.01.04.0 REGISTRO ESCRITO Ficha 50.00 - - 50.00
03.01.05 ANALISIS DE MATERIAL CULTURAL - - -
03.01.05.0 LAVADO DE MATERIAL CULTURAL bls 5.00 - - 5.00
AVANCE MENSUAL
PRESUPUESTO BASE PROGRAMADO TOTAL MES
ITEMS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ANTERIOR ACUMULADO SALDO
FEBRERO
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DESCRIPCION DE PARTIDA UND CANT
05.01 EQUIPOS DE PROTECCION INDIVIDUAL jgo 10.00 - - 10.00
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
01.03 CONSTRUCCION DE ESCALINATAS
01.03.09 ACARREO MANUAL D = 25 m
Progresiva 0+560 al 0+600km 8.00 8.00
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 1.00 UND
Progresiva 0+575 al 0+590km( vereda)(Lado derecho) 1.00 1.00
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 1.00 PZA
Progresiva 0+390 1.00 1.00
1.1.5.3.1.2 TUBERIA PVC SAL DE Ø 6" 6.00 M
Progresiva 0+287.50 (interseccion) 1.00 6.00 6.00
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD VOLUMEN SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.6.2 SUB-RASANTE
1.1.6.2.2 CORTE DE TERRENO A NIVEL DE SUB RASANTE 150.00 M3
Progresiva 0+400AL 0+500 1.00 100.00 6.00 0.25 150.00
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 4.00 UND
Progresiva 0+500 al 0+530km( vereda)(Lado izquierdo) Progresiva 0+825 al
4.00 4.00
0+0+840km(Lado derecho)
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
1.1.12.3 NIVELACION INT. Y APISONADO MANUAL 14.40 M2
Progresiva 0+450 al 0+466km(Lado derecho) 1.00 16.00 0.90 14.40
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
02.01.04 CAMA DE ARENA PARA APOYO DE TUBERIA 8.10 M2
Progresiva 0+977(Lado Izquierdo) 1.00 5.40 1.50 8.10
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3 CONEXIONES DOMICILIARIAS
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 3.00 PZA
Progresiva 0+750 y 0+780 (Lado Izquierdo) 3.00 3.00
1.1.5.3.1.2 TUBERIA PVC SAL DE Ø 6" 12.00 M
Progresiva 0+750 y 0+780 (Lado Izquierdo) 2.00 6.00 12.00
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3 CONEXIONES DOMICILIARIAS
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 1.00 PZA
Progresiva 0+750 y 0+780 (Lado derecho) 1.00 1.00
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 1.00 PZA
Progresiva 0+950 al 980 (lado Derecho) 1.00 1.00
1.1.12 VEREDAS Y GRADAS
1.1.12.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 30.00 M
Progresiva 0+372 al 0+402 1.00 30.00 30.00
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 2.00 UND
Progresiva 0+372 al 0+402(Lado Izquierdo) 2.00 2.00
1.1.5.3.1 ACCESORIOS
1.1.5.3.1.1 CACHIMBA YEE PVC DE 6" A 8" 1.00 PZA
Progresiva 0+950 al 980 (lado Derecho) 1.00 1.00
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.12 VEREDAS Y GRADAS
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
Página 114
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 3.00 UND
Progresiva 0+340 al 0+370km(Lado Derecho) 3.00 3.00
1.1.12 VEREDAS Y GRADAS
02.01.04 CAMA DE ARENA PARA APOYO DE TUBERIA 19.20 m2
Progresiva 0+972 al 0+980Vereda(Lado Izquierda) 1.00 10.00 1.20 12.00
Progresiva 0+972 al 0+980 graderia(Lado Izquierda) 1.00 3.00 2.40 7.20
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
1.1.6.2 SUB-RASANTE
1.1.6.2.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 228.15 M3
Progresiva 0+745 al 0+970 Proveniente de excavaciones de veredas y
1.00 225.00 7.80 0.10 228.15
sardineles asimismo de las instalaciones de desague buzones etc..
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
1.1.6.2 SUB-RASANTE
1.1.6.2.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 280.00 M
Progresiva 0+700 al 0+980 1.00 280.00 280.00
1.1.6.2.2 CORTE DE TERRENO A NIVEL DE SUB RASANTE 87.36 M3
Progresiva 0+700 al 0+980 1.00 280.00 7.80 0.04 87.36
1.1.6.2.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM 113.57 M3
Progresiva 0+700 al 0+980 1.00 280.00 7.80 0.04 113.57
1.1.5.3.2 CAJAS DE REGISTRO
1.1.5.3.2.1 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" INC. TAPA 1.00 UND
Progresiva 0+390 al 0+402km(Lado Derecho) 1.00 1.00
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA
APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
Página 119
FORMATO - 13
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO –
PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.1 REPOSICION DE COLECTOR GENERAL
1.1.5.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION 7.50 M
Progresiva 0+970 al 0+977.50 7.50 7.50
1.1.5.1.2 EXCAVACION MANUAL DE ZANJAS 28.13 M3
Progresiva 0+970 al 0+977.50 7.50 1.50 2.50 28.13
1.1.5.1.3 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL 13.50 M2
Progresiva 0+970 al 0+977.50 1.00 7.50 1.80 13.50
CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_
1.1.5.1.4 7.50 M
Progresiva 0+970 al 0+977.50 1.00 7.50 7.50
1.1.5.1.5 TUBERIA PVC SAL DE Ø 8" (200 MM) 7.50 M
Progresiva 0+970 al 0+977.50 1.00 7.50 7.50
1.1.5.1.6 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO M3
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE
SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 4.02 m2
Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20 2.00 2.01 4.02
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.40 m3
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN
CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON m3
1.1.5.5 BUZONES
1.1.5.5.5 CONCRETO FC=100 KG/CM2 PARA EL SOLADO DE BUZON_x000D_ Area 0.40 m3
Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20 2.00 2.01 0.10 0.40
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area m3
Progresiva 0+977 y 0+971 Buzon Nº21 y Nº20 2.00 1.13 0.20 0.45
1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 4.02 m2
Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 2.01 4.02
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.40 m3
Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 2.01 0.10 0.40
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.45 m3
Progresiva 0+950 y 0+922 Buzon Nº19 Y Nº18 2.00 1.13 0.20 0.45
1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 4.02 m2
Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 2.01 4.02
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.40 m3
Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 2.01 0.10 0.40
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.45 m3
Progresiva 0+870 y 0+845 Buzon Nº17 Y Nº16 2.00 1.13 0.20 0.45
1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 2.01 m2
Progresiva 0+800 Buzon Nº 15 1.00 2.01 2.01
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.20 m3
Progresiva 0+800 Buzon Nº 15 1.00 2.01 0.10 0.20
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.23 m3
Progresiva 0+800 Buzon Nº 15 1.00 1.13 0.20 0.23
ITEM HOJA
DESCRIPCION DE SUSTENTO DE METRADOS
CANTIDAD - PARTIDAS NUEVAS REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 2.01 m2
Progresiva 0+800 Buzon Nº 13 1.00 2.01 2.01
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.20 m3
Progresiva 0+800 Buzon Nº 13 1.00 2.01 0.10 0.20
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.23 m3
Progresiva 0+800 Buzon Nº 13 1.00 1.13 0.20 0.23
1.1.5.3.3.2 EXCAVACION MANUAL DE ZANJAS PARA LAS CONEXIONES DOMICILIARIAS EN TERRENO NORMAL 8.64 m3
Progresiva 0+750 al 0+780km( Lado derecho) 1.00 12.00 0.60 1.20 8.64
1.1.5.3.3.3 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ 0.72 m3
Progresiva 0+750 al 0+780km( Lado derecho) 1.00 12.00 0.60 0.10 0.72
1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 2.01 m2
Progresiva 0+790 Buzon Nº 14 1.00 2.01 2.01
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.20 m3
Progresiva 0+790 Buzon Nº 14 1.00 2.01 0.10 0.20
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.23 m3
Progresiva 0+790 Buzon Nº 14 1.00 1.13 0.20 0.23
1.1.5.5.12 DEMOLICION DE BUZONES EXISTENTE _x000D_ 1.00 UND
Progresiva 0+790 Buzon Nº 14 1.00 1.00
1.1.5.5 BUZONES
1.1.5.5.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_ Area 2.01 m2
Progresiva 0+750 Buzon Nº 12 1.00 2.01 2.01
1.1.5.5.4 CAMA DE APOYO CON MATERIAL SELECCIONADA PARA DE TUBERIA, E=0.10M_x000D_ Area 0.20 m3
Progresiva 0+750 Buzon Nº 12 1.00 2.01 0.10 0.20
1.1.5.5.10 CONCRETO FC=175 KG/CM2 PARA LA MEDIA CAÑA DE LA BASE DEL BUZON Area 0.23 m3
Progresiva 0+750 Buzon Nº 12 1.00 1.13 0.20 0.23
FORMATO - 13
1.3.1.15.7.2 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRU m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.7.3 EXCVACION DE ZANJA CON MAQUINARIA PARA BASE DE m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.7.4 PERFILADO, NIVELADP Y COMACTACION MANUAL, EN TE m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.7.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARI m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.7.6 CONCRETO F'C=100KG/CM2 PARA EL SOLADO DE MURO DE m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.7.7 ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCION m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.7.8 CONCRETO F'C=175 KG/CM2 +30% PG m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.7.9 CURADO DE AGUA m2 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.15.7.10 COLOCADO DE PIEDRA CHANCADA DE 3/4" PARA LAS ZANJ m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
RELLENADO Y COMPACTADO CON MATERIAL PROPIO
1.3.1.15.7.11 m3 0.00 - 0.00 0.00% - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
5.4.- METRADOS DIARIOS POR PARTIDAS NUEVAS 02 DE OBRA
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO –
DEPARTAMENTO DE CUSCO”
INFORME TECNICO MENSUAL DE FEBRERO DEL 2023
Nº medidas Total
Descripcion partida unidad ubicación Nº veces Volumen
elementos Largo Ancho Altura Area Metrado
ITEM.
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! obra 0.35
1
#REF! #REF!
#REF! #REF! #REF! area total 528.00
obra 1 5.5 96 528.00
#REF! #REF! #REF! area total 528.00
obra 1 5.5 96 528.00
#REF! #REF!
#REF! #REF! #REF! area total 228.00
obra 1 6 38 228.00
#REF! #REF! #REF! area total 228.00
obra 1 6 38 228.00
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
LIMPIEZA DEL TERRENO MANUAL 11.84 M2
Conchupata baja prog. 0+070 14.80 0.80 11.84
TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_
11.84 M2
Conchupata baja prog. 0+070 14.80 0.80 11.84
EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL MURO _x000D_
1.3.1.15.2.3 15.98 M3
Conchupata baja prog. 0+070 1.00 14.80 0.40 2.70 15.98
1.3.1.15.1.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION 40.40 M2
graderia conchupata baja prog. 0+070 al 0+094 1.00 14.80 2.73 40.40
CONCRETO f'c= 175kg/cm2 + 30%PG_x000D_
1.3.1.15.1.8 4.44 M3
graderia conchupata baja prog. 0+080 al 0+094 1.00 14.80 0.20 1.50 4.44
1.3.1.15.1.4 PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_ 14.80 M2
graderia conchupata baja prog. 0+070 al 0+094 1.00 14.80 1.00 14.80
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_
1.3.1.15.1.5 18.70 M3
graderia conchupata baja prog. 0+080 al 0+094 1.00 14.80 0.40 2.70 18.70
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
1.3.1.15.1.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION 27.30 M2
graderia conchupata baja prog. 0+850 al 0+900 1.00 10.50 2.60 27.3
1.3.1.15.1.1 LIMPIEZA DEL TERRENO MANUAL 6.36 M2
graderia conchupata baja prog. 0+850 al 0+900 1.00 10.60 0.60 6.36
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_
1.3.1.15.1.5 0.99 M3
graderia conchupata baja prog. 0+850 al 0+900 1.00 10.60 0.40 0.20 0.99216
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
1.3.1.15.1.1 LIMPIEZA DEL TERRENO MANUAL 8.40 M2
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.80 8.40
TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION _x000D_
1.3.1.15.2.2 6.36 M2
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 0.60 6.36
EXCAVACION DE ZANJAS CON MAQUINARIA PARA LA BASE DEL MURO _x000D_
1.3.1.15.2.3 8.48 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 0.40 2.00 8.48
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_
1.3.1.15.2.5 8.93 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 0.40 1.80 8.93
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
PERFILADO, NIVELADO Y COMPACTACION MANUAL, EN TERRENO NORMAL_x000D_
1.3.1.15.1.4 10.60 M2
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 1.00 10.6
CONCRETO FC=100 KG/CM2 PARA EL SOLADO DEL MURO DE CONTENCION
1.3.1.15.1.6 2.54 M3
Conchupata baja prog. 0+105 al 0+094 1.00 14.84 1.00 0.10 1.484
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 1.00 0.10 1.06
1.3.1.15.1.7 ENCOFRADO Y DESENCOFRADO DEL MURO DE CONTENCION 21.42 M2
Conchupata baja prog. 0+105 al 0+094 1.00 10.60 2.02 21.41624
CONCRETO f'c= 175kg/cm2 + 30%PG_x000D_
1.3.1.15.1.8 5.04 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.60 0.80 5.04
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=7KM_x000D_
1.3.1.15.1.5 13.44 M3
Conchupata baja prog. 0+105 al 0+094 4.00 10.50 0.80 0.40 13.44
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
1.3.1.15.71 MUROS DE CONCRETO CICLOPEO MC-10 TRAMO ESCALINATA
CONCRETO f'c= 175kg/cm2 + 30%PG_x000D_
1.3.1.15.1.8 9.45 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.60 1.50 9.45
1.3.1.15.1.11 COLOCADO DE PIEDRA CHANCADA DE 1/2" PARA LA ZANJAS DE SUBDRENAJE LONGITUDINAL 1.68 M3
Conchupata baja prog. 0+105 al 0+094 1.00 10.50 0.20 0.80 1.68
Sunday, December 12, 2021
DIMENSIONES (m)
ITEM DESCRIPCION CANTIDAD REPET. SUBTOTAL METRADO UND.
LONGITUD ANCHO ALTURA
FORMATO - 13
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
Página 152
FORMATO - 13
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.1.10.3 ACERO DE 1/2" PARA JUNTAS TRANSVERSALES kg 6.01 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11 SARDINELES PARA JARDINERIA
1.1.11.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.2 EXCAVACION MANUAL DE ZANJAS m³ 54.09 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.3 ACARREO DE MATERIAL EXCEDENTE (d=40m) m³ 22.54 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.4 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.5 ENCOFRADO Y DESENCOFRADO m² 59.8 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.6 CONCRETO f'c= 175 kg/cm2, EN SADINELES m³ 530.49 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.7 SELLADO DE JUNTAS m 9.70 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.11.8 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.1.18 PLAN DE MONITOREO ARQUEOLOGICO
1.1.18.1 ELABORACION DEL PLAN DE PLAN DE MONITO und 20000.00 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2 SISTEMA DE EVACUACION DE AGUAS PLUVIALES
1.2.1 CUNETA LATERAL
1.2.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.1.2 ENCOFRADO Y DESENCOFRADO m² 59.80 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.1.3 CONCRETO f'c= 210 kg/cm2, EN CUNETAS m³ 646.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.1.4 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.1.5 JUNTAS ASFALTICAS DE 1" x 2" m 9.39 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5 CUNETAS DE CORONACION
1.2.5.1 LIMPIEZA DEL TERRENO MANUAL m² 2.71 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.2 ACARREO DE MATERIAL EXCEDENTE (d=40m) m³ 22.54 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.3 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.4 NIVELACION INT. Y APISONADO MANUAL m² 11.26 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.5 ENCOFRADO Y DESENCOFRADO m² 59.80 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.6 CONCRETO f'c= 210 kg/cm2, EN CUNETAS m³ 646.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.7 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.8 SELLADO DE JUNTAS m 9.70 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.9 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.2.5.10 EXCAVACION MANUAL DE ZANJAS m³ 54.09 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3 OBRAS DE ARTE Y SEÑALIZACION
1.3.1 MUROS DE CONCRETO CICLOPEO
1.3.1.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.2 EXCAVACION MANUAL DE ZANJAS m³ 54.09 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.3 ACARREO DE MATERIAL EXCEDENTE (d=40m) m³ 22.54 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.4 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.5 ENTIBADO EN ZONAS DE CORTE m² 34.14 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.6 SOLADO H=0.10 M,MEZCLA 1:12, C:H m² 39.77 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.7 ENCOFRADO Y DESENCOFRADO m² 59.80 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.8 CONCRETO f'c= 175 kg/cm2 + 30%PM m³ 480.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
Página 154
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO
Unid. Metrado P.U Presup. Metrado Valoriz % Metrado Valoriz % Metrado Valoriz % Metrado Valoriz %
1.3.1.9 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.10 CAMA DE APOYO m³ 176.94 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.11 TUBERIA HDPE DE Ø 4", CON GEOCOMPUESTO m 34.98 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.12 COLOCADO DE MATERIAL DE FILTRO (ZANJAS D m 22.66 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.13 RELLENO Y COMPACTADO CON MATERIAL DE m³ 86.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.1.14 EMBOQUILLADO DE PIEDRA CON CONCRETO f'c= m² 86.28 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2 MUROS DE CONCRETO ARMADO
1.3.2.1 TRAZO Y REPLANTEO DURANTE EL PROCESO DE m 4.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.2 EXCAVACION MANUAL DE ZANJAS m³ 54.09 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.3 ACARREO DE MATERIAL EXCEDENTE (d=40m) m³ 22.54 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.4 ELIMINACION DE MATERIAL EXCEDENTE CON m³ 15.74 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.5 ENTIBADO EN ZONAS DE CORTE m² 34.14 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.6 SOLADO H=0.10 M,MEZCLA 1:12, C:H m² 39.77 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.7 ENCOFRADO Y DESENCOFRADO m² 59.80 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.8 CONCRETO f'c= 210 kg/cm2, EN MUROS DE CONTE m³ 646.82 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.9 ACERO DE REFUERZO f'y= 4200 Kg/cm2 kg 6.1 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.10 CURADO DE CONCRETO m² 2.31 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.11 RELLENO Y COMPACTADO CON MATERIAL DE m³ 86.16 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.12 CORTE DE JUNTAS, EN MUROS m 7.1 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
1.3.2.13 SELLADO DE JUNTAS m 9.70 0.00 0.00 #DIV/0! - 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0!
- 0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
Página 155
FORMATO - 13
0.00
COSTO DIRECTO S/.0.00 S/.0.00 #DIV/0! S/.0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0!
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
OBRA “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”,
y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
120.00%
100.00%
CURVA S 100.00%
83.72%
AVANCE PROGRAMADO AVANCE EJECUTADO AVANCE FINANCIERO
80.00%
60.00% 57.26%
40.00% 35.92%
19.73%
20.00%
1.26% 0.00%
0.00% 0.00% 5.92%
3.34%
0.93%
0.00% 0.00% 0.00% 0.00%
0.00%
INICIO DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO
-20.00%
OBRA: 0054
OCT-DIC Err:509 Err:509 Err:509 - 0.00% - 0.00% - - 0.00% - 0.00% - 0.00% Err:509 Err:509 421,385.54 Err:509
ABRIL Err:509 Err:509 Err:509 16,976.48 0.93% 16,976.48 0.93% - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 987,049.05 Err:509
- Err:509 - Err:509
COSTO DIRECTO 1,834,283.19 - 0.00% - 0.00% - Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 2,114,895.11 Err:509
GASTOS GENERALES 244,100.23 - 0.00% - Err:509 Err:509 Err:509 Err:509
GASTOS DE SUPERVISION 18,500.00 - 0.00% - Err:509 Err:509 Err:509 Err:509
GASTOS EXP. TECNICO 27,490.50 - 0.00% - Err:509 Err:509 Err:509 Err:509
GASTOS DE LIQUIDACION Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
COSTO TOTAL Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 0.00% 2,114,895.11 Err:509
"PROYECTO : MEJORAMIENTO Y TRATAMIENTO DE LA CIRCUNVALACION DE LOS BARRIOS DE KANCHISPUGIO, VALDIVIESO BUENO, VILLA DEL ROSARIO, PIOC, CONCHUPATA ALTA Y BAJA, VIRGEN DEL CARMEN Y
OBRA: CARPAPAMPA, DISTRITO DE PAUCARTAMBO, PROVINCIA DE PAUCARTAMBO CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
COMBUSTIBLE
92 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
93 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV
PROYECTO : VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
#REF!
207 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
208 #REF! #REF! #REF! UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
209 #REF! #REF! #REF! UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF!
210 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
211 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
1 GIGANTOGRAFIA DE LONA 13OZ 2.40MX3.60M -NACIONAL 1245 - UND 500.00 - - S/. - - S/. - - S/. - - S/. -
1 BOTA DE JEBE - ALBERCOM 1296 - UND 44.25 - 10.00 S/. 442.50 - S/. - 9.00 S/. 398.25 1.00 S/. 44.25
ADQUICISION DE CARRETILLAS
1 CARRETILLA DE METAL TIPO BUGUI -ISIDORA -TRUPER 1281 - UND 311.52 - 8.00 S/. 2,492.16 - S/. - 4.00 S/. 1,246.08 4.00 S/. 1,246.08
MATERIALES DE FERRETERIA
1 BALDE DE PLASTICO X 5GL-NACIONAL 1295 UND 9.80 - 8.00 S/. 78.40 - S/. - 4.00 S/. 39.20 4.00 S/. 39.20
2 CABLE VULCANIZADO 2X 12AWG-INDECO ECO 1295 METRO 4.50 - 100.00 S/. 450.00 - S/. - - S/. - 100.00 S/. 450.00
3 CILINDRO DE PLASTICO X 55 GL -NACIONAL 1295 UND 160.00 - 8.00 S/. 1,280.00 - S/. - - S/. - 8.00 S/. 1,280.00
4 CINTA TEFLON 1/2 IN X 12 M - MV 1295 UND 0.90 - 7.00 S/. 6.30 - S/. - - S/. - 7.00 S/. 6.30
5 DINAMOMETRO SIMPLE 12.KG - GERMANY 1295 UND 24.00 - 1.00 S/. 24.00 - S/. - - S/. - 1.00 S/. 24.00
6 DINAMOMETRO SIMPLE 50.KG - GERMANY 1295 UND 40.00 - 1.00 S/. 40.00 - S/. - - S/. - 1.00 S/. 40.00
7 MANGERA DE JEBE 16MM REFORZADO - QUIVER 1295 METRO 2.80 - 50.00 S/. 140.00 - S/. - - S/. - 50.00 S/. 140.00
8 OCRE COLOR ROJO-BAJER 1295 KLG 5.70 - 300.00 S/. 1,710.00 - S/. - - S/. - 300.00 S/. 1,710.00
9 PEGAMENTRO PARA PVC X 1 GL - OATEY 1295 UND 148.00 - 1.00 S/. 148.00 - S/. - - S/. - 1.00 S/. 148.00
10 PLASTICO 3.00 M DE ANCHO COLOR AZUL-PLASTIC 1295 METRO 4.20 - 200.00 S/. 840.00 - S/. - - S/. - 200.00 S/. 840.00
11 SOGA DE NAILON 3/4 IN - DRIZA 1295 METRO 4.80 - 100.00 S/. 480.00 - S/. - - S/. - 100.00 S/. 480.00
12 WINCHA DE LONA DE 50M -KAMASA 1295 UND 55.00 - 1.00 S/. 55.00 - S/. - - S/. - 1.00 S/. 55.00
13 WINCHA DE METAL 8M -INGENCO 1295 UND 28.00 - 11.00 S/. 308.00 - S/. - 4.00 S/. 112.00 7.00 S/. 196.00
2 GUANTE DE CUERO REFORSADO PARA SEGURIDAD TALLA M-NACIONAL 1313 PAR 9.70 - 10.00 S/. 97.00 - S/. - 8.00 S/. 77.60 2.00 S/. 19.40
3 GUANTE DE JEBE DE USO INDUSTRIAL CALIBRE 35 TALLA 9 - ETERNA 1313 PAR 9.70 - 10.00 S/. 97.00 - S/. - - S/. - 10.00 S/. 97.00
4 GUANTE DE POLIETILENO CON PALMA DE NITRILO TALLA M- SEGPRO 1313 PAR 4.50 - 14.00 S/. 63.00 - S/. - 13.00 S/. 58.50 1.00 S/. 4.50
5 LENTES DE PROTECCION DE POLICARBONATO LUNAS CLARAS -ASTARA 1313 UND 4.50 - 20.00 S/. 90.00 - S/. - 8.00 S/. 36.00 12.00 S/. 54.00
6 LENTE DE PROTECCION DE POLICARBONATO LUNAS OSCURAS - ASTARA 1313 UND 4.50 - 14.00 S/. 63.00 - S/. - 1.00 S/. 4.50 13.00 S/. 58.50
7 MASCARILLA DESCARTABLE CON 3 PLIEGUES PARA PROTEGER DE POLVOS -MAYFIELD 1313 MPX50 7.50 - 2.00 S/. 15.00 - S/. - - S/. - 2.00 S/. 15.00
8 GUANTES DE LATEX QUIRURJICO ESTERILES DE UN SOLO USO-IMPORTADA 1313 UND 1.30 - 100.00 S/. 130.00 - S/. - - S/. - 100.00 S/. 130.00
9 PONCHO IMPERMIABLE CON CAPUCHA - SEGPRO 1313 UND 24.50 - 3.00 S/. 73.50 - S/. - 3.00 S/. 73.50 - S/. -
10 PROTECTOR AUDITIVO TIPO TAPON DE MONOPRENO CON CORDON DE POLIESTER-TROPA 1313 UND 1.30 - 4.00 S/. 5.20 - S/. - 1.00 S/. 1.30 3.00 S/. 3.90
11 RESPIRADOR NAZAL CON FILTRO PARA VAPORES INORGANICOS X12 -ASA 1313 UND 97.00 - 1.00 S/. 97.00 - S/. - - S/. - 1.00 S/. 97.00
12 ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX- PROMAX 1313 PAR 75.00 - 3.00 S/. 225.00 - S/. - 3.00 S/. 225.00 - S/. -
ALMACEN CENTRAL
1 YESO DE 28 KG NEA 2.00 BLS 9.00 18.00 - S/. - - S/. - - S/. - - S/. -
2 PINTURA DE TRAFICO COLOR NEGRO NEA 1.00 GLN 135.00 135.00 - S/. - - S/. - - S/. - - S/. -
3 CHALECO DE IDENTIFICACION PARA PERSONAL OBRERO NEA 5.00 UND 40.00 200.00 5.00 S/. 200.00 - S/. - 5.00 S/. 200.00 - S/. -
4 ESCOBA DE PLASTICO REF. CON MANGO DE 30 CM NEA 3.00 UND 15.00 45.00 1.00 S/. 15.00 - S/. - 1.00 S/. 15.00 - S/. -
5 GUANTE DE JEBE N-9 NEA 5.00 PAR 10.50 52.50 5.00 S/. 52.50 - S/. - - S/. - 5.00 S/. 52.50
6 GUANTE DE CUERO REFORZADO TIPO BADANA NEA 5.00 PAR 9.50 47.50 - S/. - - S/. - - S/. - - S/. -
7 PINTURA DE TRAFICO COLOR AMARILLO NEA 1.00 GLN 65.00 65.00 - S/. - - S/. - - S/. - - S/. -
8 THIÑER ACRILICO NEA 2.00 GLN 18.00 36.00 - S/. - - S/. - - S/. - - S/. -
9 ZAPATOS PUNTA ACERO PARA PERSONAL OBRERO NEA 3.00 PAR 75.00 225.00 3.00 S/. 225.00 - S/. - 2.00 S/. 150.00 1.00 S/. 75.00
CONTRATACION DE CALAMINA
1 CALAMINA GALVANIZADA 0.22 MM X 1.80 M - ZJ ZEJIM 1256 60.00 UND 22.01 1,320.42 45.00 S/. 990.32 - S/. - 29.00 S/. 638.20 16.00 S/. 352.11
CONTRATACION DE CIZALLA
1 CIZALLA 12 IN- IMPORTADA 1219 1.00 UND 56.00 56.00 1.00 S/. 56.00 - S/. - 1.00 S/. 56.00 - S/. -
VARILLAS DE ACERO
1 VARILLA DE ACERO CORRUGADO GRADO 60 DE 1/2 IN X 9M -ACEROS AREQUIPA 1239 30.00 UND 51.60 1,548.00 28.00 S/. 1,444.80 - S/. - 1.00 S/. 51.60 27.00 S/. 1,393.20
2 PICO DE ACERO CON MANGO DE MADERA -APOLO 1285 15.00 UND 84.96 1,274.40 10.00 S/. 849.60 - S/. - 7.00 S/. 594.72 3.00 S/. 254.88
2 UNIFORME DE FAINA DRILL -OBRERO UNISEX-NACIONAL 1232 10.00 UND 63.50 635.00 4.00 S/. 254.00 - S/. - 1.00 S/. 63.50 3.00 S/. 190.50
MATERIALES EPP
1 CINTA DE SEÑALIZACION DE SEGURIDAD DE PLASTICO 15CM X 100M -NACIONAL 1276 10.00 UND 16.00 160.00 10.00 S/. 160.00 - S/. - 1.00 S/. 16.00 9.00 S/. 144.00
2 CONO DE SEGURIDAD 70CM -SEGPRO 1276 100.00 UND 32.00 3,200.00 96.00 S/. 3,072.00 - S/. - 2.00 S/. 64.00 94.00 S/. 3,008.00
3 LINTERNA LED RECARGABLE DE MANO CON ADAPTADOR 110/220V -OPALUX 1276 1.00 UND 100.00 100.00 1.00 S/. 100.00 - S/. - - S/. - 1.00 S/. 100.00
4 MALLA DE POLIPROPILENO PARA SEÑALIZACION DE SEGURIDAD 1M X 50 M COLOR ANARANJADO - SEGPRO 1276 10.00 UND 38.00 380.00 10.00 S/. 380.00 - S/. - - S/. - 10.00 S/. 380.00
EQUIPO LIVIANOS
1 AMOLADORA DE 7IN -BOSH 1279 1.00 UND 950.00 950.00 1.00 S/. 950.00 - S/. - - S/. - 1.00 S/. 950.00
2 COMPACTADOR VIFRATORIO TIPO PLANCHA 5.5 HP-FORCE HONDA 1279 1.00 UND 3520.00 3,520.00 1.00 S/. 3,520.00 - S/. - - S/. - 1.00 S/. 3,520.00
3 MARTILLO DEMOLEDOR ELECTRICO- DEWALT 1279 1.00 UND 3400.00 3,400.00 1.00 S/. 3,400.00 - S/. - - S/. - 1.00 S/. 3,400.00
4 ROTOMARTILLO 1500W - EMTOP 1279 1.00 UND 650.00 650.00 1.00 S/. 650.00 - S/. - - S/. - 1.00 S/. 650.00
5 SIERRA CIRCULAR DE 7 1/4 IN - BOSH 1279 1.00 UND 580.00 580.00 1.00 S/. 580.00 - S/. - - S/. - 1.00 S/. 580.00
ALAMBRE Y CLAVOS
1 ALAMBRE DE ACERO NEGRO RECOSIDO CALIBRE 16 - TREPER 1231 150.00 KLG 5.30 795.00 150.00 S/. 795.00 - S/. - 1.00 S/. 5.30 149.00 S/. 789.70
2 ALAMBRE DE ACERO NEGRO RECOSIDO CALIBRE 8 -TREPER 1231 150.00 KLG 5.30 795.00 150.00 S/. 795.00 - S/. - 5.00 S/. 26.50 145.00 S/. 768.50
3 CLAVO DE FIERRO 3 IN (AL PESO)-TREPER 1231 350.00 KLG 5.30 1,855.00 350.00 S/. 1,855.00 - S/. - 1.00 S/. 5.30 349.00 S/. 1,849.70
4 CLAVO DE FIERRO 4 IN (AL PESO) -TREPER 1231 100.00 KLG 5.30 530.00 100.00 S/. 530.00 - S/. - - S/. - 100.00 S/. 530.00
5 CLAVO DE FIERRO PARA CALAMINA 3 IN(AL PESO)-KAMALY 1231 10.00 KLG 8.00 80.00 6.00 S/. 48.00 - S/. - 4.00 S/. 32.00 2.00 S/. 16.00
HERRAMIENTAS MANUALES
1 CINCEL PLANO 12 IN - CYA 1233 10.00 UND 20.00 200.00 9.00 S/. 180.00 - S/. - 1.00 S/. 20.00 8.00 S/. 160.00
2 CINCEL PUNTA 12 IN -CYA 1233 10.00 UND 20.00 200.00 9.00 S/. 180.00 - S/. - - S/. - 9.00 S/. 180.00
3 CIZALLA DE ACERO 24 IN -KAMALY 1233 1.00 UND 68.00 68.00 1.00 S/. 68.00 - S/. - - S/. - 1.00 S/. 68.00
4 COMBA 12 LB -TRUPER 1233 3.00 UND 112.00 336.00 2.00 S/. 224.00 - S/. - - S/. - 2.00 S/. 224.00
5 COMBA 20 LB - TRUPER 1233 3.00 UND 208.00 624.00 3.00 S/. 624.00 - S/. - - S/. - 3.00 S/. 624.00
6 COMBA DE 4 LB - TRUPER 1233 3.00 UND 56.50 169.50 1.00 S/. 56.50 - S/. - - S/. - 1.00 S/. 56.50
7 RASTRILLO DE METAL 16 DIENTES 120 CM -CASCO 1233 3.00 UND 21.00 63.00 2.00 S/. 42.00 - S/. - 2.00 S/. 42.00 - S/. -
2 ESPADRAPO HIPOALERGENICO DE PAPEL 5 CM X 9.1 M-3M 1226 1.00 UND 8.00 8.00 1.00 S/. 8.00 - S/. - - S/. - 1.00 S/. 8.00
3 GASA ESTERIL PRECORTADA 10 CM X 10 CM - TOPMEDIC 1226 10.00 UND 2.00 20.00 10.00 S/. 20.00 - S/. - - S/. - 10.00 S/. 20.00
4 GUANTES DE LATEX QUIRURJICO ESTERILES DE UN SOLO USO-IMPORTADA 1226 100.00 UND 2.00 200.00 100.00 S/. 200.00 - S/. - - S/. - 100.00 S/. 200.00
5 PARACETAMOL 500 MG TAB-PORTUGAL 1226 50.00 UND 0.30 15.00 50.00 S/. 15.00 - S/. - 13.00 S/. 3.90 37.00 S/. 11.10
6 PEROXIDO DE HIDROGENO 10 VSOL X 120 ML- ALCOFARMA 1226 2.00 UND 2.00 4.00 2.00 S/. 4.00 - S/. - - S/. - 2.00 S/. 4.00
7 TIJERA DE METAL 13 CM (5 1/8 IN)PUNTA METAL IMPORTADA 1226 1.00 UND 18.00 18.00 1.00 S/. 18.00 - S/. - - S/. - 1.00 S/. 18.00
8 VENDA ELASTICA 3IN X YD -GOD LIFE 1226 1.00 UND 2.00 2.00 1.00 S/. 2.00 - S/. - - S/. - 1.00 S/. 2.00
9 VENDA ELASTICA 4IN X5YD ALKHOFAR 1226 1.00 UND 2.50 2.50 1.00 S/. 2.50 - S/. - - S/. - 1.00 S/. 2.50
10 YODO POVIDONA 8.5 G /100 ML SOL120ML-IMPORTADO 1226 2.00 UND 11.00 22.00 2.00 S/. 22.00 - S/. - - S/. - 2.00 S/. 22.00
IMPLEMENTOS DE BOTIQUIN
1 ALCOHOL ETILICO (ETANOL)96° X 1 L- ALCOFARMA 1114 7.00 UND 10.50 73.50 6.00 S/. 63.00 - S/. - - S/. - 6.00 S/. 63.00
2 ALGODÓN HIDROFILO X 100 G-FARMA 1114 1.00 UND 4.30 4.30 1.00 S/. 4.30 - S/. - - S/. - 1.00 S/. 4.30
3 AMOXICILINA 250 MG TAB-FARMA 1114 100.00 UND 0.49 49.00 100.00 S/. 49.00 - S/. - 20.00 S/. 9.80 80.00 S/. 39.20
4 APOSITO DE GASA FRACCIONADA 10 X 10 CM -GASA 1114 5.00 UND 4.70 23.50 5.00 S/. 23.50 - S/. - - S/. - 5.00 S/. 23.50
5 BAJALENGUA DE MADERA ADULTO X 100 -BAJANEGUA 1114 1.00 UND 38.00 38.00 1.00 S/. 38.00 - S/. - - S/. - 1.00 S/. 38.00
6 CLORURO DE SODIO AL 0.9 % X100 ML -CLORURO 1114 1.00 UND 8.60 8.60 1.00 S/. 8.60 - S/. - - S/. - 1.00 S/. 8.60
7 ESPADRAPO HIPOALERGENICO DE PAPEL 5 CM X 9.1 M-3M 1114 1.00 UND 15.80 15.80 1.00 S/. 15.80 - S/. - - S/. - 1.00 S/. 15.80
8 GASA ESTERIL 7.5 X7.5 DE 8 PLIEGUES X 3 UND -GASA 1114 4.00 UND 2.50 10.00 4.00 S/. 10.00 - S/. - - S/. - 4.00 S/. 10.00
9 GASA ESTERIL PRECORTADA 10X10 CM-GASA 1114 5.00 UND 2.50 12.50 5.00 S/. 12.50 - S/. - - S/. - 5.00 S/. 12.50
10 IBUPROFENO 800 MG TAB-PORTUGAL 1114 50.00 UND 0.40 20.00 50.00 S/. 20.00 - S/. - 2.00 S/. 0.80 48.00 S/. 19.20
11 PEROXIDO DE HIDROGENO 20 V SOL X1L -OXIGENADA 1114 7.00 UND 8.00 56.00 7.00 S/. 56.00 - S/. - - S/. - 7.00 S/. 56.00
12 PINZA KELLY RECTA 5 1/2 IN -QUIRURJICA 1114 1.00 UND 30.00 30.00 1.00 S/. 30.00 - S/. - - S/. - 1.00 S/. 30.00
13 VENDA ELASTICA 3 IN X 5 YD -ALKHOFAR 1114 2.00 UND 2.20 4.40 2.00 S/. 4.40 - S/. - - S/. - 2.00 S/. 4.40
14 VENDA ELASTICA 4 IN X 5 YD -ALKHOFAR 1114 2.00 UND 2.70 5.40 2.00 S/. 5.40 - S/. - - S/. - 2.00 S/. 5.40
15 YODO POVIDONA 8.5 G /100 ML SOL120ML-YODOPOVIDONA 1114 1.00 UND 22.50 22.50 1.00 S/. 22.50 - S/. - - S/. - 1.00 S/. 22.50
ÚTILES DE IMPRENTA
1 CUADERNO DE OBRA TAMAÑO A4 X100 HOJAS - NACIONAL 1039 5.00 UND 58.00 290.00 5.00 S/. 290.00 - S/. - 1.00 S/. 58.00 4.00 S/. 232.00
2 FORMATO DE PARTE DIARIO- NACIONAL 1039 5.00 UND 25.00 125.00 5.00 S/. 125.00 - S/. - - S/. - 5.00 S/. 125.00
3 FORMATO NOTA DE ENTRADA AL ALMACEN BLOCK X 50 JUEGOS - NACIONAL 1039 5.00 UND 25.00 125.00 5.00 S/. 125.00 - S/. - - S/. - 5.00 S/. 125.00
4 FORMATO NOTA DE SALIDA DEL ALMACEN AUTOCOPIATIVO BLOCK X50 HOJAS - NACIONAL 1039 7.00 UND 25.00 175.00 7.00 S/. 175.00 - S/. - 1.00 S/. 25.00 6.00 S/. 150.00
5 SELLO DE JEBE DEL PERSONAL - NACIONAL 1039 - UND 28.00 - - S/. - - S/. - - S/. - - S/. -
6 TARJETA DE CONTROL VISIBLE DE ALMACEN - NACIONAL 1039 - CIENTO 28.00 - - S/. - - S/. - - S/. - - S/. -
2 CAHELCO DE DRIL TIPO PERIODISTA UNISEX - DRILL 1065 10.00 UND 95.00 950.00 4.00 S/. 380.00 - S/. - 4.00 S/. 380.00 - S/. -
3 CORTAVIENTO PROTECTOR DE DRIL PARA USO DEBAJO DEL CASCO - DRILL 1065 10.00 UND 5.00 50.00 4.00 S/. 20.00 - S/. - - S/. - 4.00 S/. 20.00
4 LENTES DE SEGURIDAD CON PROTECCION ULTRAVIOLETA - STEEELPRO 1065 10.00 UND 40.00 400.00 4.00 S/. 160.00 - S/. - - S/. - 4.00 S/. 160.00
5 PONCHO IMPERMIABLE CON CAPUCHA - TASLAN 1065 10.00 UND 22.00 220.00 10.00 S/. 220.00 - S/. - 9.00 S/. 198.00 1.00 S/. 22.00
6 ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX - CLUTE 1065 5.00 PAR 320.00 1,600.00 - S/. - - S/. - - S/. - - S/. -
1 PAPEL BOND 75G. TAMAÑO A4 - CHAMEX 0056 12.00 MILL 39.40 472.80 - S/. - 12.00 S/. 472.80 - S/. - 12.00 S/. 472.80
GIGANTOGRAFIA DE LONA
1 GIGANTOGRAFIA DE LONA 13 OZ 2.40M X 3.60M 0060 1.00 UND 510.00 510.00 - S/. - 1.00 S/. 510.00 1.00 S/. 510.00 - S/. -
TOTAL COSTO DIRECTO S/. 36,069.46 S/. 0.00 S/. 5,972.27 S/. 30,097.18
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
PROYECTO: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y “Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE
SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
MOVIMIENTO DIARIO ALMACEN - FEBRERO
ACUM. MES
ÍTEM O/C MATERIALES UND P.U. SALDO ANTERIOR INGR/SAL 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
FEBRERO
SALDO TOTAL
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
CARTEL DE OBRA
INGRESO -
1 1245 GIGANTOGRAFIA DE LONA 13OZ 2.40MX3.60M -NACIONAL UND 500.00 - -
SALIDA -
ADQUICISION DE BOTAS DE JEBE
INGRESO -
1 1296 BOTA DE JEBE - ALBERCOM UND 44.25 10.00 1.00
SALIDA 5.0 3.0 1.0 9.0
ADQUICISION DE CARRETILLAS
INGRESO -
1 1281 CARRETILLA DE METAL TIPO BUGUI -ISIDORA -TRUPER UND 311.52 8.00 4.00
SALIDA 1.0 1.0 1.0 1.0 4.0
ADQUICISION DE PAPEL TOALLA
INGRESO -
1 1259 PAPEL TOALLA HOJA SIMPLE BLANCO X 300M-DIONNE UND 48.97 19.00 14.00
SALIDA 2.0 1.0 1.0 1.0 5.0
MATERIALES DE FERRETERIA
INGRESO -
1 1295 BALDE DE PLASTICO X 5GL-NACIONAL UND 9.80 8.00 4.00
SALIDA 4.0 4.0
INGRESO -
2 1295 CABLE VULCANIZADO 2X 12AWG-INDECO ECO METRO 4.50 100.00 100.00
SALIDA -
INGRESO -
3 1295 CILINDRO DE PLASTICO X 55 GL -NACIONAL UND 160.00 8.00 8.00
SALIDA -
INGRESO -
4 1295 CINTA TEFLON 1/2 IN X 12 M - MV UND 0.90 7.00 7.00
SALIDA -
INGRESO -
5 1295 DINAMOMETRO SIMPLE 12.KG - GERMANY UND 24.00 1.00 1.00
SALIDA -
INGRESO -
6 1295 DINAMOMETRO SIMPLE 50.KG - GERMANY UND 40.00 1.00 1.00
SALIDA -
INGRESO -
7 1295 MANGERA DE JEBE 16MM REFORZADO - QUIVER METRO 2.80 50.00 50.00
SALIDA -
INGRESO -
8 1295 OCRE COLOR ROJO-BAJER KLG 5.70 300.00 300.00
SALIDA -
INGRESO -
9 1295 PEGAMENTRO PARA PVC X 1 GL - OATEY UND 148.00 1.00 1.00
SALIDA -
INGRESO -
10 1295 PLASTICO 3.00 M DE ANCHO COLOR AZUL-PLASTIC METRO 4.20 200.00 200.00
SALIDA -
INGRESO -
11 1295 SOGA DE NAILON 3/4 IN - DRIZA METRO 4.80 100.00 100.00
SALIDA -
INGRESO -
12 1295 WINCHA DE LONA DE 50M -KAMASA UND 55.00 1.00 1.00
SALIDA -
INGRESO -
13 1295 WINCHA DE METAL 8M -INGENCO UND 28.00 11.00 7.00
SALIDA 2.0 1.0 1.0 4.0
EQUIPOS DE PROTECCION PARA PERSONAL OBRERO
INGRESO -
1 1313 CASCO PROTECTOR DE PLASTICO - NACIONAL UND 9.00 4.00 -
SALIDA 4.0 4.0
INGRESO -
2 1313 GUANTE DE CUERO REFORSADO PARA SEGURIDAD TALLA M-NACIONAL PAR 9.70 10.00 2.00
SALIDA 5.0 2.0 1.0 8.0
INGRESO -
3 1313 GUANTE DE JEBE DE USO INDUSTRIAL CALIBRE 35 TALLA 9 - ETERNA PAR 9.70 10.00 10.00
SALIDA -
INGRESO -
4 1313 GUANTE DE POLIETILENO CON PALMA DE NITRILO TALLA M- SEGPRO PAR 4.50 14.00 1.00
SALIDA 3.0 8.0 1.0 1.0 13.0
INGRESO -
5 1313 LENTES DE PROTECCION DE POLICARBONATO LUNAS CLARAS -ASTARA UND 4.50 20.00 12.00
SALIDA 4.0 2.0 1.0 1.0 8.0
INGRESO -
6 1313 LENTE DE PROTECCION DE POLICARBONATO LUNAS OSCURAS - ASTARA UND 4.50 14.00 13.00
SALIDA 1.0 1.0
MASCARILLA DESCARTABLE CON 3 PLIEGUES PARA PROTEGER DE INGRESO -
7 1313
POLVOS -MAYFIELD
MPX50 7.50 2.00 2.00
SALIDA -
GUANTES DE LATEX QUIRURJICO ESTERILES DE UN SOLO USO- INGRESO -
8 1313
IMPORTADA
UND 1.30 100.00 100.00
SALIDA -
INGRESO -
9 1313 PONCHO IMPERMIABLE CON CAPUCHA - SEGPRO UND 24.50 3.00 -
SALIDA 3.0 3.0
PROTECTOR AUDITIVO TIPO TAPON DE MONOPRENO CON CORDON DE INGRESO -
10 1313
POLIESTER-TROPA
UND 1.30 4.00 3.00
SALIDA 1.0 1.0
INGRESO -
11 1313 RESPIRADOR NAZAL CON FILTRO PARA VAPORES INORGANICOS X12 -ASA UND 97.00 1.00 1.00
SALIDA -
INGRESO -
12 1313 ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX- PROMAX PAR 75.00 3.00 -
SALIDA 1.0 2.0 3.0
ALMACEN CENTRAL
INGRESO -
1 NEA YESO DE 28 KG BLS 9.00 - -
SALIDA -
INGRESO -
1 NEA PINTURA DE TRAFICO COLOR NEGRO GLN 135.00 - -
SALIDA -
INGRESO -
3 NEA CHALECO DE IDENTIFICACION PARA PERSONAL OBRERO UND 40.00 5.00 -
SALIDA 2.0 1.0 2.0 5.0
INGRESO -
4 NEA ESCOBA DE PLASTICO REF. CON MANGO DE 30 CM UND 15.00 1.00 -
SALIDA 1.0 1.0
INGRESO -
5 NEA GUANTE DE JEBE N-9 PAR 10.50 5.00 5.00
SALIDA -
INGRESO -
6 NEA GUANTE DE CUERO REFORZADO TIPO BADANA PAR 9.50 - -
SALIDA -
INGRESO -
7 NEA PINTURA DE TRAFICO COLOR AMARILLO GLN 65.00 - -
SALIDA -
INGRESO -
8 NEA THIÑER ACRILICO GLN 18.00 - -
SALIDA -
INGRESO -
9 NEA ZAPATOS PUNTA ACERO PARA PERSONAL OBRERO PAR 75.00 3.00 1.00
SALIDA 1.0 1.0 2.0
CONTRATACION DE CALAMINA
INGRESO -
1 1256 CALAMINA GALVANIZADA 0.22 MM X 1.80 M - ZJ ZEJIM UND 22.01 45.00 16.00
SALIDA 4.0 20.0 5.0 29.0
CONTRATACION DE HOJAS BOND
INGRESO -
1 1290 PAPEL BOND 75G TAMAÑO A4-JUSTUS EMPX500 21.50 6.00 2.00
SALIDA 1.0 1.0 1.0 1.0 4.0
BOMBA MANUAL DE TRANSFERENCIA DE COMBUSTIBLE
INGRESO -
1 1271 BOMBA MANUAL DE TRANSFERENCIA DE COMBUSTIBLE-TRUPER UND 135.00 1.00 1.00
SALIDA -
HERRAMIENTAS DE TRABAJO MANUAL
INGRESO -
1 1284 PALA TIPO CUCHARA DE ACERO CON MANGO DE MADERA - APOLO UND 47.50 10.00 4.00
SALIDA 2.0 2.0 1.0 1.0 6.0
CONTRATACION DE CIZALLA
INGRESO -
1 1219 CIZALLA 12 IN- IMPORTADA UND 56.00 1.00 -
SALIDA 1.0 1.0
VARILLAS DE ACERO
VARILLA DE ACERO CORRUGADO GRADO 60 DE 1/2 IN X 9M -ACEROS INGRESO -
1 1239
AREQUIPA
UND 51.60 28.00 27.00
SALIDA 1.0 1.0
HERRAMIENTAS DE TRABAJO MANUAL
INGRESO -
1 1285 BARRRETA DE FIERRO HEXAGONAL 1 IN X 1.5 M -APOLO UND 64.90 2.00 1.00
SALIDA 1.0 1.0
INGRESO -
2 1285 PICO DE ACERO CON MANGO DE MADERA -APOLO UND 84.96 10.00 3.00
SALIDA 4.0 2.0 1.0 7.0
UNIFORME PARA PERSONAL OBRERO
INGRESO -
1 1232 CHALECO DE DRIL UNISEX COLOR ROJO -NACIONAL UND 32.00 4.00 -
SALIDA 1.0 3.0 4.0
INGRESO -
2 1232 UNIFORME DE FAINA DRILL -OBRERO UNISEX-NACIONAL UND 63.50 4.00 3.00
SALIDA 1.0 1.0
MATERIALES EPP
CINTA DE SEÑALIZACION DE SEGURIDAD DE PLASTICO 15CM X 100M - INGRESO -
1 1276
NACIONAL
UND 16.00 10.00 9.00
SALIDA 1.0 1.0
INGRESO -
2 1276 CONO DE SEGURIDAD 70CM -SEGPRO UND 32.00 96.00 94.00
SALIDA 2.0 2.0
LINTERNA LED RECARGABLE DE MANO CON ADAPTADOR 110/220V - INGRESO -
3 1276
OPALUX
UND 100.00 1.00 1.00
SALIDA -
MALLA DE POLIPROPILENO PARA SEÑALIZACION DE SEGURIDAD 1M X 50 M INGRESO -
4 1276
COLOR ANARANJADO - SEGPRO
UND 38.00 10.00 10.00
SALIDA -
EQUIPO LIVIANOS
INGRESO -
1 1279 AMOLADORA DE 7IN -BOSH UND 950.00 1.00 1.00
SALIDA -
INGRESO -
2 1279 COMPACTADOR VIFRATORIO TIPO PLANCHA 5.5 HP-FORCE HONDA UND 3,520.00 1.00 1.00
SALIDA -
INGRESO -
3 1279 MARTILLO DEMOLEDOR ELECTRICO- DEWALT UND 3,400.00 1.00 1.00
SALIDA -
INGRESO -
4 1279 ROTOMARTILLO 1500W - EMTOP UND 650.00 1.00 1.00
SALIDA -
INGRESO -
5 1279 SIERRA CIRCULAR DE 7 1/4 IN - BOSH UND 580.00 1.00 1.00
SALIDA -
ALAMBRE Y CLAVOS
INGRESO -
1 1231 ALAMBRE DE ACERO NEGRO RECOSIDO CALIBRE 16 - TREPER KLG 5.30 150.00 149.00
SALIDA 1.0 1.0
INGRESO -
2 1231 ALAMBRE DE ACERO NEGRO RECOSIDO CALIBRE 8 -TREPER KLG 5.30 150.00 145.00
SALIDA 3.0 2.0 5.0
INGRESO -
3 1231 CLAVO DE FIERRO 3 IN (AL PESO)-TREPER KLG 5.30 350.00 349.00
SALIDA 1.0 1.0
INGRESO -
4 1231 CLAVO DE FIERRO 4 IN (AL PESO) -TREPER KLG 5.30 100.00 100.00
SALIDA -
INGRESO -
5 1231 CLAVO DE FIERRO PARA CALAMINA 3 IN(AL PESO)-KAMALY KLG 8.00 6.00 2.00
SALIDA 1.0 1.0 2.0 4.0
HERRAMIENTAS MANUALES
INGRESO -
1 1233 CINCEL PLANO 12 IN - CYA UND 20.00 9.00 8.00
SALIDA 1.0 1.0
INGRESO -
2 1233 CINCEL PUNTA 12 IN -CYA UND 20.00 9.00 9.00
SALIDA -
INGRESO -
3 1233 CIZALLA DE ACERO 24 IN -KAMALY UND 68.00 1.00 1.00
SALIDA -
INGRESO -
4 1233 COMBA 12 LB -TRUPER UND 112.00 2.00 2.00
SALIDA -
INGRESO -
5 1233 COMBA 20 LB - TRUPER UND 208.00 3.00 3.00
SALIDA -
INGRESO -
6 1233 COMBA DE 4 LB - TRUPER UND 56.50 1.00 1.00
SALIDA -
INGRESO -
7 1233 RASTRILLO DE METAL 16 DIENTES 120 CM -CASCO UND 21.00 2.00 -
SALIDA 1.0 1.0 2.0
IMPLEMENTOS DE PREVENCION COVID 19
INGRESO -
1 1226 ALGODÓN HIDROFILO X 100 G-FARMA PRECIO UND 5.00 2.00 2.00
SALIDA -
INGRESO -
2 1226 ESPADRAPO HIPOALERGENICO DE PAPEL 5 CM X 9.1 M-3M UND 8.00 1.00 1.00
SALIDA -
INGRESO -
3 1226 GASA ESTERIL PRECORTADA 10 CM X 10 CM - TOPMEDIC UND 2.00 10.00 10.00
SALIDA -
GUANTES DE LATEX QUIRURJICO ESTERILES DE UN SOLO USO- INGRESO -
4 1226
IMPORTADA
UND 2.00 100.00 100.00
SALIDA -
INGRESO -
5 1226 PARACETAMOL 500 MG TAB-PORTUGAL UND 0.30 50.00 37.00
SALIDA 13.0 13.0
INGRESO -
6 1226 PEROXIDO DE HIDROGENO 10 VSOL X 120 ML- ALCOFARMA UND 2.00 2.00 2.00
SALIDA -
INGRESO -
7 1226 TIJERA DE METAL 13 CM (5 1/8 IN)PUNTA METAL IMPORTADA UND 18.00 1.00 1.00
SALIDA -
INGRESO -
8 1226 VENDA ELASTICA 3IN X YD -GOD LIFE UND 2.00 1.00 1.00
SALIDA -
INGRESO -
9 1226 VENDA ELASTICA 4IN X 5YD -ALKHOFAR UND 2.50 1.00 1.00
SALIDA -
INGRESO -
10 1226 YODO POVIDONA 8.5 G /100 ML SOL120ML-IMPORTADO UND 11.00 2.00 2.00
SALIDA -
IMPLEMENTOS DE BOTIQUIN
INGRESO -
1 1114 ALCOHOL ETILICO (ETANOL)96° X 1 L- ALCOFARMA UND 10.50 6.00 6.00
SALIDA -
INGRESO -
2 1114 ALGODÓN HIDROFILO X 100 G-FARMA UND 4.30 1.00 1.00
SALIDA -
INGRESO -
3 1114 AMOXICILINA 250 MG TAB-FARMA UND 0.49 100.00 80.00
SALIDA 20.0 20.0
INGRESO -
4 1114 APOSITO DE GASA FRACCIONADA 10 X 10 CM -GASA UND 4.70 5.00 5.00
SALIDA -
INGRESO -
5 1114 BAJALENGUA DE MADERA ADULTO X 100 -BAJANEGUA UND 38.00 1.00 1.00
SALIDA -
INGRESO -
6 1114 CLORURO DE SODIO AL 0.9 % X100 ML -CLORURO UND 8.60 1.00 1.00
SALIDA -
INGRESO -
7 1114 ESPADRAPO HIPOALERGENICO DE PAPEL 5 CM X 9.1 M-3M UND 15.80 1.00 1.00
SALIDA -
INGRESO -
8 1114 GASA ESTERIL 7.5 X7.5 DE 8 PLIEGUES X 3 UND -GASA UND 2.50 4.00 4.00
SALIDA -
INGRESO -
9 1114 GASA ESTERIL PRECORTADA 10 CM X 10 CM - GASA UND 2.50 5.00 5.00
SALIDA -
INGRESO -
10 1114 IBUPROFENO 800 MG TAB-PORTUGAL UND 0.40 50.00 48.00
SALIDA 2.0 2.0
INGRESO -
11 1114 PEROXIDO DE HIDROGENO 20 VSOL X 1L - OXIGENADA UND 8.00 7.00 7.00
SALIDA -
INGRESO -
12 1114 PINZA KELLY RECTA 5 1/2 IN -QUIRURJICA UND 30.00 1.00 1.00
SALIDA -
INGRESO -
13 1114 VENDA ELASTICA 3 IN X 5 YD -ALKHOFAR UND 2.20 2.00 2.00
SALIDA -
INGRESO -
14 1114 VENDA ELASTICA 4 IN X 5 YD -ALKHOFAR UND 2.70 2.00 2.00
SALIDA -
INGRESO -
15 1114 YODO POVIDONA 8.5 G /100 ML SOL120ML-YODOPOVIDONA UND 22.50 1.00 1.00
SALIDA -
ÚTILES DE IMPRENTA
INGRESO -
1 1039 CUADERNO DE OBRA TAMAÑO A4 X100 HOJAS - NACIONAL UND 58.00 5.00 4.00
SALIDA 1.0 1.0
INGRESO -
2 1039 FORMATO DE PARTE DIARIO- NACIONAL UND 25.00 5.00 5.00
SALIDA -
FORMATO NOTA DE ENTRADA AL ALMACEN BLOCK X 50 JUEGOS - INGRESO -
3 1039
NACIONAL
UND 25.00 5.00 5.00
SALIDA -
FORMATO NOTA DE SALIDA DEL ALMACEN AUTOCOPIATIVO BLOCK X 50 INGRESO -
4 1039
JUEGOS - NACIONAL
UND 25.00 7.00 6.00
SALIDA 1.0 1.0
INGRESO -
5 1039 SELLO DE JEBE DEL PERSONAL - NACIONAL UND 28.00 - -
SALIDA -
INGRESO -
6 1039 TARJETA DE CONTROL VISIBLE DE ALMACEN - NACIONAL CIENTO 28.00 - -
SALIDA -
EQUIPOS DE PROTECCION PERSONAL TECNICO
CASCO DE PROTECCION DE POLIETILENO DE ALTA DENSIDAD COLOR INGRESO -
1 1065
BLANCO - 3M
UND 50.00 4.00 -
SALIDA 4.0 4.0
INGRESO -
2 1065 CHALECO DE DRIL TIPO PERIODISTA UNISEX- DRILL UND 95.00 4.00 -
SALIDA 4.0 4.0
CORTAVIENTO PROTECTOR DE DRIL PARA USO DEBAJO DEL CASCO - INGRESO -
3 1065
DRILL
UND 5.00 4.00 4.00
SALIDA -
INGRESO -
4 1065 LENTES DE SEGURIDAD CON PROTECCION ULTRAVIOLETA - STEELPRO UND 40.00 4.00 4.00
SALIDA -
INGRESO -
5 1065 PONCHO IMPERMIABLE CON CAPUCHA - TASLAN UND 22.00 10.00 1.00
SALIDA 3.0 1.0 2.0 3.0 9.0
INGRESO -
6 1065 ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX- CLUTE PAR 320.00 - -
SALIDA -
PAPEL BOND 75G. TAMAÑO A4
INGRESO 12.0 12.0
1 0056 PAPEL BOND 75G. TAMAÑO A4 - CHAMEX MILL 39.40 - 12.00
SALIDA -
GIGANTOGRAFIA DE LONA
INGRESO 1.0 1.0
1 0060 GIGANTOGRAFIA DE LONA 13 OZ 2.40M X 3.60M UND 510.00 - -
SALIDA 1.0 1.0
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
FORMATO - 07-08
DIAGRAMA DE AVANCE FISICO PROGRAMADO-EJECUTADO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y
“Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
PROGRAMADO EJECUTADO
ITEM PERIODO (S/.) PORCENTAJE (S/.) PORCENTAJE
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
0 INICIO 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
1 DICIEMBRE 23,116.57 23,116.57 1.26% 1.26% 0.00 0.00 0.00% 0.00%
ENERO 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
2 FEBRERO 38,184.61 61,301.18 2.08% 3.34% 16,976.48 16,976.48 0.93% 0.93%
3 MARZO 47,332.08 108,633.26 2.58% 5.92%
4 ABRIL 253,203.40 361,836.66 13.80% 19.73%
5 MAYO 296,994.68 658,831.34 16.19% 35.92%
6 JUNIO 391,390.86 1,050,222.20 21.34% 57.26%
7 JULIO 485,374.42 1,535,596.62 26.46% 83.72%
8 AGOSTO 298,686.57 1,834,283.19 16.28% 100.00%
TOTAL: 1,834,283.19 100.00% 16,976.48 0.93%
100.00% 100.00%
83.72%
80.00%
PROGRAMADO
57.26%
60.00%
EJECUTADO
35.92%
40.00%
19.73%
20.00%
0.00% 5.92%
3.34%
0.00% 1.26%
0.00% 0.00% 0.93%
DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO
25.00%
21.34%
20.00%
16.19% 16.28%
15.00% 13.80%
10.00%
5.00% 2.58%
0.93%
0.00% 2.08%
1.26%
0.00% 0.00%
0.00% 0.00%
0.00%
INICIO
DICIE...
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
FORMATO - 08-06
DIAGRAMA DE AVANCE FINANCIERO PROGRAMADO-EJECUTADO
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y
“Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO”
INICIAL
COSTO DIRECTO DE OBRA: S/. 1,834,283.19 MES DE FEBRERO
CORRESPONDE AL MES:
PROGRAMADO EJECUTADO
ITEM PERIODO (S/.) PORCENTAJE (S/.) PORCENTAJE
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
0 INICIO 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
1 DICIEMBRE 90,488.60 90,488.60 4.11% 4.11% 0.00 0.00 0.00% 0.00%
ENERO 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00%
2 FEBRERO 78,066.14 168,554.74 3.55% 7.66% 0.00 0.00 0.00% 0.00%
3 MARZO 87,213.61 255,768.34 3.97% 11.63%
4 ABRIL 293,084.93 548,853.27 13.33% 24.96%
5 MAYO 336,876.21 885,729.48 15.32% 40.27%
6 JUNIO 431,272.38 1,317,001.86 19.61% 59.88%
7 JULIO 525,255.95 1,842,257.81 23.88% 83.76%
8 AGOSTO 357,068.10 2,199,325.91 16.24% 100.00%
TOTAL: 2,199,325.91 100.00% 0.00 0.00%
100.00%
100.00%
80.00% 83.76%
60.00%
59.88%
40.00%
40.27%
24.96%
20.00%
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
25.00%
23.88%
20.00% 19.61%
15.32%
15.00% 16.24%
13.33%
10.00%
0.00% 0.00%
0.00%
DICIEMBRE 0.00%
ENERO 0.00%
FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO
OBSERVACION: En los graficos de avance financiero, se considera montos devengados al mes de febrero, se incluye gastos generales correspondiente a los meses de setiembre, octubre y
noviembre, sin embargo el gasto financiero en funcion a la ejecucion fisica se presenta desde el mes N° 01 (Diciembre).
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
AVANCES
PROGRAMADO SALDO
ANTERIOR ACTUAL ACUMULADO
ITEM MOVIMIENTO DE MAQUINARIA CONDICION
Valorizado Valorizado Valorizado Valorizado
VALORIZADO % % % % %
S/. S/. S/. S/.
VEHICULOS
1 MAQUINARIA PESADA PROPIA S/ 53,344.93 51.57% S/ 0.00 0.00% S/ 925.00 1.73% S/ 925.00 1.73% S/ 52,419.93 98.27%
2 MAQUINARIA LIVIANA PROPIA S/ 46,357.38 44.82% S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00% S/ 46,357.38 100.00%
3 MAQUINARIA PESADA ALQUILADA S/ 3,733.34 3.61% S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00% S/ 3,733.34 100.00%
4 MAQUINARIA LIVIANA ALQUILADA S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00% S/ 0.00 0.00%
TOTAL 103,435.65 0.00 0.00% 925.00 0.89% 925.00 0.89% 102,510.65 99.11%
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISION DE OBRAS
CAMION VOLQUETE NISSAN WZ7499 DIESEL 5.00 23.00 115.00 5.00 1.00 40.00 200.00 TRASLADO DE DIVERSOS MATERIALES A OBRA
MAQUINARIA PESADA
CAMION VOLQUETE MERCEDES EGA-352 DIESEL 9.00 23.00 207.00 2.50 3.60 105.00 262.50 TRASLADO Y ELIMINACION DE MATERIAL DE DESMONTE
CAMION VOLQUETE VOLVO XO-8336 DIESEL 9.00 23.00 207.00 2.50 3.60 105.00 262.50 TRASLADO Y ELIMINACION DE MATERIAL DE DESMONTE
TIPO DE MAQUINARIA
RETROEXCAVADORA JCB 3CX DIESEL 2.00 23.00 46.00 2.00 1.00 100.00 200.00 CARGUIO DE DESMONTE
OBRA : “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD PEATONAL DE LAS CALLES “B”, “D”, “C”, “H1”, “P”, “Q”, “R”, “S”, “T”, “U”, “V”, “W”, “X”, y RESIDENTE : ING. WILLIAM DAVID VARGAS MUÑOZ
“Y” DE LA APV VIRGEN CONCEPCION, DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO – DEPARTAMENTO DE CUSCO” INSPECTOR : ING. WILBERT RAUL HURTADO TERRAZAS
CORRESPONDE : FEBRERO 2023
FECHA 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 TOTAL
UNIDAD Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
DIA HORA MAQUINA COMBUSTIBLE
HM 3.00 2.00
PETROLEO 9.00
CAMION VOLQUETE MERCEDES EGA-352 2.50 9.00
HM 2.50
PETROLEO 9.00
CAMION VOLQUETE VOLVO XO-8336 2.50 9.00
HM 2.50
PETROLEO 2.00
RETROEXCAVADORA JCB 3CX 2.00 2.00
HM 2.00
TIPO DE MAQUINARIA
GASOLINA
CANGURO COMPACTADORA 0.00
HM
EQUIPOS LIVIANOS
GASOLINA
MEZCLADORA DE CONCRETO 0.00
HM
GASOLINA
VIBRADORA DE CONCRETO 0.00
HM
GASOLINA
MOTOBOMBA 0.00
HM