CUADRO RESUMEN DE ADICIONALES - EDIFICIO C

MONTOS y ESTADO DE ADICIO


DESCRIPCION JUSTIFICACION RESPONSABLE

NIVELACION DEL MONTO TOTAL DE LA FASE 01 POR DIFERENCIA DE


ADICIONAL NRO. 01:NIVELACION DEL MONTO TOTAL DE LA FASE 01 -DIFERENCIA TÉCNICA UTILIDAD PROPUESTO POR AREA TÉCNICA DR

ACTUALIZACIONES EN ALCANCE DE DISCIPLINA DE HVAC POR LOS


ADICIONAL NRO. 02: SISTEMA DE DATA CENTER PARA PROYECTO PISOS DEL 01 AL 10 PISOS ADICIONALES DEL 1 AL 10 DR

ADICIONAL NRO. 03: ACERO DE REFUERZO ADICIONAL POR POSTENSADO EN LOSAS Y VIGAS REFUERZO ADICIONAL PRODUCTO DE INGENIERIA DEFINITIVA DE DR
REFUERZO POSTENSADO

ADICIONAL NRO. 05: MANTENIMENTO DE UNIDADES CONDENSADORES POR LOS RECLAMOS DE LA SUNAT, SE REALIZO LOS MANTENIMIENTO DR
Y PROTECCIÓN DE LOS EQUIPOS ANTES DESCRITOS

ADICIONAL NRO. 07: SOBREDIMENSIONAMIENTO POSTENSADO DISEÑO SOBREDIMENSIONADO DR

ADICIONAL NRO. 08: CONSTRUCCIÓN PISOS 8, 9 Y 10. DISCONTI NUIDAD EN LA EJECUCIÓN DE OBRA. DR

POR DEMANDA DE MERCADO , SE SOLICITÓ EL CAMBIO DE UNA DE


ADICIONAL NRO. 10: GIMNASIO LAS SALAS DE REUNIONES A UN GIMNASIO CON SUS RESPECTIVOS DR
VESTIDORES.

-ENTUBADO PARA INSTALACION DE GPS DEL REGISTRADOR


ACELEROGRAFICO
-INSTALACION DE LAVADERO CUARTO DE LIMPIEZA SOTANO
ADICIONAL: CAMBIOS EN INSTALACIONES SANITARIAS Y ELÉCTRICAS -MODIFICACION DE DRENAJES DE LOS SOTANOS DR
-FALTA SISTEMA DE DRENAJE PARA TODOS LOS EQUIPOS FAN COIL
HALL DE ASCENSORES
-MONTANTE DE DESAGUE EN NIVEL 1 -ADICIONAL DE MONTANTE

ESTRUCTURA PROVISIONAL OTIS DR


ESCALERA 05 DR
PISO 01 DR
CARPINTERIA METALICA DR
ACERO INOXIDABLE DR
PINTURA ECOLÓGICA PARA PUERTAS DE MADERA DR
TECHOS VEGETALES DR
PISO 01 DR
POZO SUMIDERO DR
INSTALACIONES SANITARIAS POR CAMBIO 10 PISOS DR
PLANTA DE TRATAMIENTO DR
INSTALACIONES SANITARIAS EN AZOTEA DR
PISO 01 DR
MEDIA TENSION DR

ENTUBADO Y CONEXIÓN ELECTRICA POR CAMBIO 10 PISOS DR

PISO 01 DR
ILUMINACION DR
GIMNASIO HVAC DR
INSTALACIONES DE HVAC POR CAMBIOS 10 PISOS DR
PISO 01 DR
PISO 01 DR
CAMBIO DE BOMBA CONTRA INCENDIO DR
PISO 01 DR
REINTEGRO MO DR
MAYORES GG DE SC DR
TOTALES FASE I
TOTALES FASE II

PLAZO DE EJECUCIÓN
SUMEN DE ADICIONALES - EDIFICIO CORPORATIVO ANDRES REYES
MONTOS y ESTADO DE ADICIONALES
COSTO DIRECTO GASTOS G. UTILIDAD SUBTOTAL IGV TOTAL S/. PORCENTAJE DE AVANCE EN OBRA FECHA DE PRESENTACION

S/. 586,986.32 586,986.32 105,657.54 692,643.85 100.00% 5/30/2015

S/. 324,939.80 39,912.45 364,852.24 65,673.40 430,525.65 20.00% 3/14/2016

S/. 8,793.60 1,080.12 9,873.72 1,777.27 11,650.99 100.00% 3/14/2016

S/. 10,612.43 1,303.53 11,915.95 2,144.87 14,060.83 100.00% 3/14/2016

S/. 452,010.00 55,520.52 507,530.52 91,355.49 598,886.01 100.00% 3/14/2016

S/. 3,512,053.17 431,386.48 3,943,439.65 709,819.14 4,653,258.78 30.00% 10/6/2016

S/. 148,457.43 18,235.07 166,692.49 30,004.65 196,697.14 100.00% 7/6/2016

S/. 20,981.65 2,577.18 23,558.83 4,240.59 27,799.42 100.00% 7/6/2016

S/. 33,837.95 4,156.32 37,994.27 6,838.97 44,833.24 0.00% 11/3/2016


S/. 1,703.71 209.27 1,912.98 344.34 2,257.31 100.00% 11/3/2016
S/. 93,347.84 11,465.94 104,813.78 18,866.48 123,680.26 0.00% 11/3/2016
S/. 31,670.43 3,890.09 35,560.52 6,400.89 41,961.41 0.00% 11/3/2016
S/. 27,534.70 3,382.09 30,916.79 5,565.02 36,481.82 0.00% 11/3/2016
S/. 14,249.70 1,750.29 15,999.99 2,880.00 18,879.99 0.00% 11/3/2016
S/. 34,021.17 4,178.83 38,200.00 6,876.00 45,076.00 0.00% 11/3/2016
S/. 168,048.25 20,641.41 188,689.66 33,964.14 222,653.80 0.00% 11/3/2016
S/. 15,408.98 1,892.69 17,301.67 3,114.30 20,415.97 20.00% 11/3/2016
S/. 31,549.74 3,875.26 35,425.00 6,376.50 41,801.50 20.00% 11/3/2016
S/. 22,846.13 2,806.20 25,652.33 4,617.42 30,269.75 20.00% 11/3/2016
S/. 18,302.17 2,248.06 20,550.23 3,699.04 24,249.27 100.00% 11/3/2016
S/. 69,078.73 8,484.96 77,563.69 13,961.46 91,525.15 0.00% 11/3/2016
S/. 436,397.21 53,602.79 490,000.00 88,200.00 578,200.00 0.00% 11/3/2016

S/. 47,357.87 5,816.98 53,174.85 9,571.47 62,746.32 20.00% 11/3/2016

S/. 28,784.74 3,535.64 32,320.38 5,817.67 38,138.05 0.00% 11/3/2016


S/. 300,707.96 36,936.04 337,644.00 60,775.92 398,419.92 0.00% 11/3/2016
S/. 19,565.75 2,403.27 21,969.01 3,954.42 25,923.44 0.00% 11/3/2016
S/. 35,641.34 4,377.84 40,019.18 7,203.45 47,222.63 0.00% 11/3/2016
S/. 48,435.96 5,949.40 54,385.36 9,789.37 64,174.73 0.00% 11/3/2016
S/. 62,405.81 7,665.32 70,071.13 12,612.80 82,683.94 0.00% 11/3/2016
S/. 240,624.08 29,555.92 270,180.00 48,632.40 318,812.40 0.00% 11/3/2016
S/. 29,052.24 3,568.49 32,620.73 5,871.73 38,492.47 0.00% 11/3/2016
S/. 149,166.20 18,322.13 167,488.33 30,147.90 197,636.23 70.00% 11/3/2016
S/. 199,141.44 24,460.60 223,602.04 40,248.37 263,850.41 0.00% 11/3/2016
S/. 586,986.32 S/. 0.00 S/. 0.00 S/. 586,986.32 S/. 105,657.54 S/. 692,643.85
S/. 6,636,728.17 S/. 0.00 S/. 815,191.18 S/. 7,451,919.35 S/. 1,341,345.48 S/. 8,793,264.84
STATUS RO STATUS PRESENTACION COSTO DIRECTO APROBADO ACUM A DICIEMBRE -15 ENERO-16 FEBRERO-16

Imputado APROBADO FASE 1 S/. 586,986.32

Imputado APROBADO FASE 2

Imputado APROBADO FASE 2 S/. -

Imputado APROBADO FASE 2 S/. -

Imputado APROBADO FASE 2 S/. -

Imputado APROBADO FASE 2 S/. -

Imputado APROBADO FASE 2 S/. -

Imputado APROBADO FASE 2 S/. -

proyectado APROBADO FASE 2


Imputado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
Imputado APROBADO FASE 2
Imputado APROBADO FASE 2
Imputado APROBADO FASE 2
Imputado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2

Imputado APROBADO FASE 2

proyectado APROBADO FASE 2


proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
proyectado APROBADO FASE 2
Imputado APROBADO FASE 2
proyectado APROBADO FASE 2
S/. 0.00 S/. 586,986.32 S/. 0.00 S/. 0.00
S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00

ACUM A DICIEMBRE -15 ENERO-16 FEBRERO-16


MONTOS / VALORIZACIONES - Y PLAZOS DE
MARZO-16 ABRIL-16 MAYO-16 JUNIO-16 JULIO-16 AGOSTO-16 SEPTIEMBRE-16 OCTUBRE-16 NOVIEMBRE-16

S/. 27,654.30

S/. 9,873.72

S/. 11,915.95

S/. 507,530.52

S/. 165,285.49 S/. 165,285.49 S/. 136,638.15

S/. 166,692.49

S/. 19,996.67 S/. 3,562.16

S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
S/. 529,320.19 S/. 0.00 S/. 0.00 S/. 186,689.16 S/. 3,562.16 S/. 0.00 S/. 192,939.79 S/. 165,285.49 S/. 136,638.15

MARZO-16 ABRIL-16 MAYO-16 JUNIO-16 JULIO-16 AGOSTO-16 SEPTIEMBRE-16 OCTUBRE-16 NOVIEMBRE-16


MONTOS / VALORIZACIONES - Y PLAZOS DE EJECUCION
DICIEMBRE-16 ENERO-17 FEBRERO-17 MARZO-17 ABRIL-17 MAYO-17 JUNIO-17 TOTALES (SIN IGV)

S/. 586,986.32

S/. 72,970.45 S/. 72,970.45 S/. 45,316.15 S/. 72,970.45 S/. 72,970.45 S/. 364,852.24

S/. 9,873.72

S/. 11,915.95

S/. 507,530.52

S/. 213,695.45 S/. 1,064,943.28 S/. 853,905.29 S/. 856,048.59 S/. 214,361.51 S/. 136,638.15 S/. 136,638.15 S/. 3,943,439.55

S/. 166,692.49

S/. 23,558.83

S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 586,986.32
S/. 213,695.45 S/. 1,137,913.73 S/. 926,875.74 S/. 901,364.74 S/. 287,331.95 S/. 209,608.60 S/. 136,638.15 S/. 5,027,863.30

DICIEMBRE-16 ENERO-17 FEBRERO-17 MARZO-17 ABRIL-17 MAYO-17 JUNIO-17