LUGAR: MORROPON-MORROPON-PIURA
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN EL AA.HH 09 DE OCTUBRE EN MORROPÓN, DISTRITO DE MORROPÓN, PROVINCIA DE MORROPÓN, DEPARTAMENTO PIURA”
MESES TOTAL
DESCRIPCION
MONTO S/. TOTAL S/. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
PAVIMENTACION
OBRAS PRELIMINARES Y PROVISIONALES 88,671.65 88,671.65 88,671.65
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m 2,265.23 S/ 2,265.23 2,265.23
ALQUILER DE AMBIENTE PARA ALMACEN Y OFICINA 8,555.25 S/ 5,988.68 S/ 2,566.58 8,555.25
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 35,000.00 S/ 17,500.00 S/ 17,500.00 35,000.00
MANTENIMIENTO DE TRANSITO Y SEÑALIZACION 24,000.00 S/ 12,000.00 S/ 12,000.00 24,000.00
LIMPIEZA DE TERRENO 5,766.67 S/ 3,460.00 S/ 2,306.67 5,766.67
TRAZO Y REPLANTEO INICIAL 13,084.50 S/ 6,542.25 S/ 6,542.25 13,084.50
TRABAJOS DE NIVELACION DE TECHOS DE BUZONES 397,529.54 397,529.54 397,529.54
DEMOLICION DE CONCRETO EXISTENTE 26,930.79 S/ 2,693.08 S/ 18,851.55 S/ 5,386.16 26,930.79
DEMOLICION DE CONCRETO EXISTENTE EN VEREDAS 69,428.67 S/ 6,942.87 S/ 13,885.73 S/ 48,600.07 69,428.67
ELIMINACION DE MATERIAL EXCEDENTE DM >10 km 61,396.50 S/ 36,837.90 S/ 24,558.60 61,396.50
MOVIMIENTO DE TIERRAS 58,672.35 S/ 41,070.65 S/ 17,601.71 58,672.35
RELLENO A NIVEL DE SUBRAZANTE EN TODA LA OBRA 126,870.15 S/ 12,687.02 S/ 88,809.11 S/ 25,374.03 126,870.15
CORTE A NIVEL DE SUBRAZANTE EN TODA LA OBRA 54,231.08 S/ 24,403.99 S/ 29,827.09 54,231.08
710,468.22 710,468.22 710,468.22
PERFILADO Y COMPACTADO 101,636.37 S/ 25,409.09 S/ 25,409.09 S/ 50,818.19 101,636.37
BASE DE AFIRMADO e=0.20 m 38,750.25 S/ 3,875.03 S/ 11,625.08 S/ 15,500.10 S/ 7,750.05 38,750.25
SUB RASANTE CON PIEDRA OVERe=0.15-0.20 m 274,351.77 S/ 27,435.18 S/ 109,740.71 S/ 109,740.71 S/ 27,435.18 274,351.77
PAVIMENTO RIGIDO 84,244.05 S/ 33,697.62 S/ 25,273.22 S/ 25,273.22 84,244.05
CONCRETO F'C=210KG/CM2 PARA PAVIMENTO RIGIDO 211,485.78 S/ 84,594.31 S/ 105,742.89 S/ 21,148.58 211,485.78
ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RIGIDO 110,872.43 110,872.43 110,872.43
CURADO DE PAVIMENTO RIGIDO 82,235.18 82,235.18
INSTALACION DE DOWEL 1/2" ACERO CORRUGADO 28.29 S/ 28.29 28.29
JUNTAS ASFALTICAS 2,852.13 S/ 2,281.70 S/ 570.43 2,852.13
VEREDAS 763.97 S/ 458.38 S/ 152.79 S/ 152.79 763.97
OBRAS PRELIMINARES 456.98 S/ 365.58 S/ 91.40 456.98
LIMPIEZA DE TERRENO 2,939.30 S/ 1,763.58 S/ 1,175.72 2,939.30
TRAZO Y REPLANTEO 1,690.88 S/ 676.35 S/ 676.35 S/ 338.18 1,690.88
MOVIMIENTO DE TIERRAS 284.79 S/ 113.92 S/ 113.92 S/ 56.96 284.79
EXCAVACION MANUAL DE MATERIAL SUELTO H=.20 DE PROFUNDIDAD 18,526.86 S/ 1,852.69 S/ 11,116.12 S/ 5,558.06 18,526.86
ELIMINACION DE MATERIAL EXCEDENTE DM >10 km 6,229.32 S/ 2,491.73 S/ 3,114.66 S/ 622.93 6,229.32
PERFILADO Y COMPACTADO EN S/RASANTE EN VEREDAS 9,845.09 S/ 1,969.02 S/ 7,876.07 9,845.09
BASE GRANULAR E=10cm COMPACTADO PARA VEREDA 2,092.79 S/ 209.28 S/ 627.84 S/ 1,255.67 2,092.79
CONCRETO SIMPLE 29,279.49 S/ 5,855.90 S/ 17,567.69 S/ 5,855.90 29,279.49
ENCOFRADO Y DESENCONFRADO DE VEREDAS 7,245.29 S/ 7,245.29 7,245.29
VEREDA DE CONCRETO f'c=175 kg/cm2 e=0.10cm, ACABADO Y BRUÑADO 28,637.25 28,637.25
CURADO DE VEREDA 63.57 S/ 63.57 63.57
JUNTA DE DILATACION e=1" 420.39 S/ 210.20 S/ 210.20 420.39
PINTURAS 2,042.17 S/ 1,021.09 S/ 1,021.09 2,042.17
PINTADO DE BORDE VEREDAS H=10CM 304.52 S/ 304.52 304.52
NIVELACION DE BUZONES Y CAJAS DE REGISTRO 25,806.60 S/ 15,483.96 S/ 10,322.64 25,806.60
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
LUGAR: MORROPON-MORROPON-PIURA
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN EL AA.HH 09 DE OCTUBRE EN MORROPÓN, DISTRITO DE MORROPÓN, PROVINCIA DE MORROPÓN, DEPARTAMENTO PIURA”
MESES TOTAL
DESCRIPCION
MONTO S/. TOTAL S/. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
SUM. NIVELACION Y COLOCACION DE CAJAS AGUA (TERMOPLASTICO) 16,588.29 16,588.29 16,588.29
SUM. NIVELACION Y COLOCACION DE CAJAS DESAGUE (CONCRETO) 7,397.84 S/ 2,219.35 S/ 5,178.49 7,397.84
SARDINELES 1,772.04 S/ 177.20 S/ 1,594.84 1,772.04
OBRAS PRELIMARES 5,914.60 S/ 1,478.65 S/ 4,435.95 5,914.60
LIMPIEZA DE TERRENO 1,503.81 S/ 751.91 S/ 751.91 1,503.81
TRAZO Y REPLANTEO 57,660.97 57,660.97 57,660.97
MOVIMIENTO DE TIERRAS 12,000.00 12,000.00
EXCAVACION DE ZANJA PARA SARDINELES 12,000.00 S/ 3,000.00 S/ 3,000.00 S/ 3,000.00 S/ 3,000.00 12,000.00
ELIMINACION DE MATERIAL EXCEDENTE DM >10 km 5,715.00 5,715.00
CONCRETO ARMADO 1,480.00 S/ 370.00 S/ 370.00 S/ 370.00 S/ 370.00 1,480.00
ENCOFRADO Y DESENCOFRADO EN SARDINELES 4,235.00 S/ 3,811.50 S/ 423.50 4,235.00
CONCRETO f'c=175 kg/cm2 EN SARDINELES 300.00 300.00
CONCRETO f'c=210 kg/cm2 EN SARDINELES 300.00 S/ 150.00 S/ 150.00 300.00
ACERO DE 3/8 f'y= 4200 kg/cm2 EN SARDINELES 28,620.37 28,620.37
ACERO DE 1/2 f'y= 4200 kg/cm2 EN SARDINELES 502.86 S/ 502.86 502.86
JUNTA DE DILATACION e=1" 251.43 S/ 251.43 251.43
PINTURAS 6,228.22 S/ 3,114.11 S/ 2,491.29 S/ 622.82 6,228.22
PINTADO EN SARDINEL 8,495.00 S/ 2,123.75 S/ 2,123.75 S/ 2,123.75 S/ 2,123.75 8,495.00
SISTEMA DE DRENAJE PLUVIAL 12,709.08 S/ 2,541.82 S/ 10,167.26 12,709.08
MOVIMIENTO DE TIERRAS 433.78 S/ 433.78 433.78
PERFILADO Y COMPACTADO DE SUPERFICIES DE CUNETAS 11,025.60 11,025.60
BASE GRANULAR e=0.15 m 5,032.80 S/ 1,006.56 S/ 4,026.24 5,032.80
CONCRETO ARMADO 5,992.80 S/ 1,198.56 S/ 1,198.56 S/ 3,595.68 5,992.80
ENCOFRADO Y DESENCOFRADO EN CUNETA 20,000.00 20,000.00 20,000.00
CONCRETO f'c=210 kg/cm2 EN CUNETAS 20,000.00 S/ 5,000.00 S/ 5,000.00 S/ 5,000.00 S/ 5,000.00 20,000.00
BLOQUES DE CONCRETO ARMADO PARA ACCESO A RAMPA 18,000.00 18,000.00 18,000.00
CONCRETO f'c=175 kg/cm2 PARA ACCESO A RAMPA 18,000.00 S/ 9,000.00 S/ 3,600.00 S/ 5,400.00 18,000.00
ACERO f'Y=4200 kg/cm2 PARA ACCESO A RAMPA
JUNTA DE DILATACION
JUNTA DE DILATACION DE CUNETA CON ASFALTO
SANEAMIENTO JIRON 3 LADO DERECHO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE MATERIAL SUELTO P/ZANJAS
REFINE, NIVELACION Y FONDOS PARA TUBERIAS
CAMA DE APOYO P/TUBERIA
RELLENO Y APIZONADO DE ZANJA
TUBERIAS Y ACCESORIOS
TUBERIA PVC SAL CLASE 7.5, DE 4"
ACCESORIOS
RAMPAS Y ESCALERAS DE ACCESO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA ESCALERAS Y RAMPAS
PERFILADO Y COMPACTADO DE SUB-RASANTE
SUB BASE GRANULAR e=0.150 m
CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO EN RAMPAS Y ESCALERAS
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
LUGAR: MORROPON-MORROPON-PIURA
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN EL AA.HH 09 DE OCTUBRE EN MORROPÓN, DISTRITO DE MORROPÓN, PROVINCIA DE MORROPÓN, DEPARTAMENTO PIURA”
MESES TOTAL
DESCRIPCION
MONTO S/. TOTAL S/. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
CONCRETO F'C=175 KG/CM2 PARA Y ESCALERAS e=10 cm
MURO DE CONTENCION
MURO DE CONTENCION ALTURA DE 1.50 m, L=69.28m (PARTE IZQUIERDA DEL JIRÓN 3)
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
LUGAR: MORROPON-MORROPON-PIURA
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN EL AA.HH 09 DE OCTUBRE EN MORROPÓN, DISTRITO DE MORROPÓN, PROVINCIA DE MORROPÓN, DEPARTAMENTO PIURA”
MESES TOTAL
DESCRIPCION
MONTO S/. TOTAL S/. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
EXCAVACION MANUAL DE MATERIAL SUELTO MURO DE CONTENCION
ELIMINACION DE MATERIAL EXCEDENTE DM >10 km
ENCOFRADO Y DESENCOFRADO EN MURO
CONCRETO f'c= 210 kg/cm2 EN MURO
ACERO f'y= 4200 kg/cm2 EN MURO
CURADO DE MURO
ACABADO DE MURO DE CONTENCION
JUNTAS ASFÁLTICAS EN MURO E=1"
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN EL AA.HH 09 DE OCTUBRE EN MORROPÓN, DISTRITO DE MORROPÓN, PROVINCIA DE MORROPÓN, DEPARTAMENTO PIURA”
MESES TOTAL
DESCRIPCION
MONTO S/. TOTAL S/. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
CONTENEDORES ECOLOGICOS
JUEGOS RECREATIVOS
FLETE
FLETE TERRESTRE
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
LUGAR: MORROPON-MORROPON-PIURA
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN EL AA.HH 09 DE OCTUBRE EN MORROPÓN, DISTRITO DE MORROPÓN, PROVINCIA DE MORROPÓN, DEPARTAMENTO PIURA”
MESES TOTAL
DESCRIPCION
MONTO S/. TOTAL S/. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
GASTOS GENERALES (10%) 141,979.11 141,979.11 22,217.51 50,813.90 49,907.57 19,040.14 141,979.11
CRONOGRAMA DE PAGOS
CONTRATISTA
MES-AÑO PORCENTAJE
DESCRIPCION PARCIAL
DIAS %
100.00% S/. 2,010,424.20
VALORIZACION N° 01 1° MES 15.65%
S/. 314,599.91
30
VALORIZACION N° 02 2° MES 35.79%
S/. 719,524.81
60
VALORIZACION N° 03 3° MES 35.15%
S/. 706,691.14
90
VALORIZACION N° 04 4° MES 13.41%
S/. 269,608.34
120
SUPERVISION
MES-AÑO PORCENTAJE
DESCRIPCION PARCIAL
DIAS %
100.00% S/. 70,989.56
TARIFA N° 01 1° MES 25.00%
S/. 17,747.39
30
TARIFA N° 02 2° MES 25.00%
S/. 17,747.39
60
TARIFA N° 03 3° MES 25.00%
S/. 17,747.39
90
TARIFA N° 04 4° MES 25.00%
S/. 17,747.39
120
CRONOGRAMA DE PAGOS
SUPERVISION
50325 8555.25
50325 13084.5
88,671.65 88,671.65
1 2,265.23 2265.23 207,449.75
50325 8,555.25 8555.25 2,265.23
1 35,000.00 35000 61,899.75
1 24,000.00 24000 35,000.00
1 5,766.67 5766.67 24,000.00
50325 13,084.50 13084.5 5,777.77
397,529.54 397529.54 78,507.00
7105.75 26,930.79 26930.79 397,529.54
12137.88 69,428.67 69428.67 26,930.79
50325 61,396.50 61396.5 69,428.67
6682.5 58,672.35 58672.35 61,396.50
6038.556 126,870.15 126870.15 58,672.35
8526.9 54,231.08 54231.08 126,870.15
710,468.22 710,468.22 54,231.08
22143 101,636.37 101,636.37 710,468.22
22143 38,750.25 38,750.25 101,636.37
22143 274,351.77 274,351.77 38,750.25
10065 84,244.05 84,244.05 274,351.77
12078 211,485.78 211,485.78 84,244.05
110,872.43 110,872.43 211,485.78
82,235.18 82,235.18 110,872.43
108.8153 28.29 28.29 82,235.18
12.20946 2,852.13 2852.13 28.29
147.200269 763.97 763.97 2,852.13
7.297416 456.98 456.98 763.97
139.902853 2,939.30 2939.3 456.98
50.9275 1,690.88 1,690.88 2,939.30
76.9662 284.79 284.79 1,690.88
44.56726 18,526.86 18526.86 284.79
1166.5424 6,229.32 6229.32 18,526.86
157.324 9,845.09 9845.09 6,229.32
91.068 2,092.79 2092.79 9,845.09
59.94 29,279.49 29279.49 2,092.79
9.72 7,245.29 7245.29 29,279.49
28,637.25 28,637.25 7,245.29
244.5 63.57 63.57 28,637.25
81 420.39 420.39 63.57
97.2 2,042.17 2042.17 420.39
10.1 304.52 304.52 2,042.17
81 25,806.60 25806.6 304.52
16,588.29 16588.29 25,806.60
19 7,397.84 7397.84 16,588.29
4 1,772.04 1772.04 7,397.84
20 5,914.60 5914.6 1,772.04
9 1,503.81 1503.81 5,914.60
57,660.97 57660.97 1,503.81
12,000.00 12000 57,660.97
1 12,000.00 12000 12,000.00
5,715.00 5715 12,000.00
4 1,480.00 1480 5,715.00
1 4,235.00 4235 1,480.00
300.00 300 4,235.00
1 300.00 300 300.00
28,620.37 28620.37 300.00
2 502.86 502.86 28,620.37
1 251.43 251.43 502.86
1 6,228.22 6228.22 251.43
5 8,495.00 8495 6,228.22
5.9475 12,709.08 12709.08 8,495.00
0.12 433.78 433.78 12,709.08
11,025.60 11025.6 11,025.60
48 5,032.80 5032.8 5,032.80
0 5,992.80 5992.8 5,992.80
18,000.00 18,000.00 18,000.00
0 18,000.00 18000 18,000.00