ADICIONAL DE OBRA N° ADICIONAL DE OBRA N° DEDUCTIVO DE OBRA N° DEDUCTIVO DE OBRA MONTO CONTRACTUAL
ADICIONAL DE OBRA N° 02 AMP. DE PLAZO
01 03 01 N° 02 MODIFICADO I
PRESUPUESTO CONTRACTUAL N° 09
Agosto Septiembre Octubre
Item DESCRIPCION PARCIAL S/. METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
Metrado Val. 01 Metrado Val. 02 Metrado Val. 03
1.00 TRABAJOS PRELIMINARES 122,416.00 - - - - - 122,416.00 - 14,910.46 10,895.64
1.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIAS 24,081.74 - - - - - - - - - - 1.00 24,081.74 - - 0.28 6,742.89 0.12 2,889.81
1.02 TRAZO Y REPLANTEO 97,040.40 - - - - - - - - - - 12.00 97,040.40 - - 1.01 8,167.57 0.99 8,005.83
1.03 LETRERO DE OBRA 7.20 X 3.60 1,293.86 - - - - - - - - - - 1.00 1,293.86 - - - - - -
2.00 OBRAS TEMPORALES 56,178.80 - - - - - 56,178.80 - - 35,612.60
2.01 MEJORAMIENTO DE CAMINOS DE ACCESO 35,612.60 - - - - - - - - - - 20.00 35,612.60 - - - - 20.00 35,612.60
2.02 MANTENIMIENTO DE CAMINOS DE ACCESO 20,566.20 - - - - - - - - - - 12.00 20,566.20 - - - - - -
3.00 OBRAS PROVISIONALES 381.68 - - - - - 381.68 - - -
3.01 DEMOLICION DE OBRAS EXISTENTES 381.68 - - - - - - - - - - 7.50 381.68 - - - - - -
4.00 PRESA MAYOCANCHA 16,116,797.59 197,127.06 - 596,423.06 - 27,228.77 16,883,118.94 - 73,452.00 126,554.58
4.01 ESTRUCTURA DE DESVIO 1,112,372.52 - - 88,870.33 - - 1,201,242.85 - - 109,669.25
4.01.01 LIMPIEZA Y DESBROCE DE TERRENO E=0.5 M. 3,620.43 - - - - - - - - - - 1,749.00 3,620.43 - - - - 1,749.00 3,620.43
4.01.02 EXCAVACION EN MATERIAL SUELTO 2,738.76 - - - - 4,235.70 11,182.25 - - - - 5,273.11 13,921.01 - - - - 438.45 1,157.51
EXCAVACION EN ZANJA EN MATERIAL SUELTO A MANO 0.00 - - - - 340.23 9,795.22 - - - - 340.23 9,795.22 - - - - - -
RELLENO COMPACTADO PARA TERRAPLEN 0.00 - - - - 3,953.55 52,542.68 - - - - 3,953.55 52,542.68 - - - - - -
ELIMINACION DE DEESMONTE d=0.20 Km 0.00 - - - - 5,082.84 15,350.18 - - - - 5,082.84 15,350.18 - - - - - -
4.01.03 RELLENO COMPACTADO PARA ESTRUCTURAS 158,295.92 - - - - - - - - - - 5,106.32 158,295.92 - - - - - -
4.01.04 SOLADO DE CONCRETO F´C=100 KG/CM2 E=0.10 M 19,813.15 - - - - - - - - - - 659.12 19,813.15 - - - - - -
4.01.05 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL 75,729.91 - - - - - - - - - - 2,240.53 75,729.91 - - - - - -
4.01.06 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL 27,094.93 - - - - - - - - - - 533.68 27,094.93 - - - - - -
4.01.07 ACERO DE REFUERZO Fy=4200 KG/CM2 444,218.91 - - - - - - - - - - 81,808.27 444,218.91 - - - - 19,317.00 104,891.31
4.01.08 JUNTA WATER STOP 9" 11,131.95 - - - - - - - - - - 235.00 11,131.95 - - - - - -
4.01.09 CONCRETO F'C=210 KG/CM2 346,081.00 - - - - - - - - - - 868.59 346,081.00 - - - - - -
4.01.10 ATAGUIA DE PROTECCION 15,677.97 - - - - - - - - - - 569.28 15,677.97 - - - - - -
4.01.11 ENROCADO DE PROTECCION 1,715.49 - - - - - - - - - - 64.76 1,715.49 - - - - - -
4.01.12 TAPON DE CONCRETO 6,254.10 - - - - - - - - - - 6.00 6,254.10 - - - - - -
4.02 PRESA MAYOCANCHA 13,544,866.80 197,127.06 - 360,000.86 - - 14,101,994.72 - 62,100.00 14,689.11
4.02.01 LIMPIEZA Y DESBROCE DE TERRENO E=0.5 M. 95,349.62 - - - - - - - - - - 46,062.62 95,349.62 - - 30,000.00 62,100.00 7,096.19 14,689.11
4.02.02 EXCAVACION EN MATERIAL SUELTO 56,273.47 - - - - 18,410.60 48,603.98 - - - - 39,726.31 104,877.45 - - - - - -
4.02.03 EXCAVACION EN MATERIAL ROCOSO 13,004.72 - - - - - - - - - - 1,226.86 13,004.72 - - - - - -
4.02.04 RELLENO COMPACTADO PARA TERRAPLEN 6,938,921.37 - - - - 18,410.60 244,676.87 - - - - 540,526.58 7,183,598.24 - - - - - -
4.02.05 RELLENO COMPACTADO MATERIAL DE FILTRO 1,770,437.96 - - - - - - - - - - 39,501.07 1,770,437.96 - - - - - -
4.02.06 ENROCADO DE PROTECCION 2,480,218.17 - - - - - - - - - - 93,628.47 2,480,218.17 - - - - - -
4.02.07 SUMINISTRO Y COLOCACION DE PIEZOMETRO 22,522.65 - - - - - - - - - - 5.00 22,522.65 - - - - - -
4.02.08 SUMNISTRO Y COLOCACION DE ACELEROGRAFO 153,613.60 - - - - - - - - - - 2.00 153,613.60 - - - - - -
4.02.09 HITO TOPOGRAFICO 1,005.30 - - - - - - - - - - 9.00 1,005.30 - - - - - -
4.02.10 PERFORACIONES EXPLORATORIAS - COMPROBACION 81,799.70 - - - - - - - - - - 310.00 81,799.70 - - - - - -
4.02.11 PERFORACIONES PARA PANTALLA DE INYECCIONES 759,966.71 - - - - - - - - - - 2,880.08 759,966.71 - - - - - -
4.02.12 PERFORACION PARA CONTROL 107,297.46 - - - - - - - - - - 406.63 107,297.46 - - - - - -
4.02.13 PRUEBA DE AGUA EXPLORACION - CONTROL 108,585.00 - - - - - - - - - - 500.00 108,585.00 - - - - - -
4.02.14 LECHADA PARA INYECCION DE IMPERMEABILIZACION 142,436.70 - - - - - - - - - - 162.26 142,436.70 - - - - - -
LECHADA PARA INYECCION DE IMPERMEABILIZACION 0.00 260.22 197,127.06 - - - - - - - - 260.22 197,127.06 - - - - - -
4.02.15 GEOTEXTIL 300 GR/M2 481,857.63 - - - - - - - - - - 45,934.95 481,857.63 - - - - - -
4.02.16 ELIMINACION DE DESMONTE d=0.20 KM 57,365.84 - - - - 22,092.72 66,720.01 - - - - 41,088.03 124,085.85 - - - - - -
4.02.17 SUMINISTRO Y COLOCACION DE INCLINOMETRO 13,578.98 - - - - - - - - - - 1.00 13,578.98 - - - - - -
4.02.18 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL 1,219.50 - - - - - - - - - - 36.08 1,219.50 - - - - - -
4.02.19 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL 439.80 - - - - - - - - - - 8.66 439.80 - - - - - -
4.02.20 ACERO DE REFUERZO Fy=4200 KG/CM2 1,544.51 - - - - - - - - - - 284.44 1,544.51 - - - - - -
4.02.21 PUERTA METALICA INC/VENTANA METALICA DE INSPECCION 1,293.16 - - - - - - - - - - 1.00 1,293.16 - - - - - -
4.02.22 RELLENO CON MATERIAL DE RIPIO 247,206.50 - - - - - - - - - - 5,515.54 247,206.50 - - - - - -
4.02.23 RELLENO CON MATERIAL DE GRAVA 7,362.58 - - - - - - - - - - 164.27 7,362.58 - - - - - -
4.02.24 CONCRETO F'C=210 KG/CM2 1,565.87 - - - - - - - - - - 3.93 1,565.87 - - - - - -
4.03 ESTRUCTURA DE SERVICIO 240,862.18 - - - - - 240,862.18 - - -
4.03.01 LIMPIEZA Y DESBROCE DE TERRENO E=0.5 M. 3,129.59 - - - - - - - - - - 1,511.88 3,129.59 - - - - - -
4.03.02 EXCAVACION EN MATERIAL SUELTO 2,945.42 - - - - - - - - - - 1,115.69 2,945.42 - - - - - -
4.03.03 RELLENO COMPACTADO PARA ESTRUCTURAS 23,696.40 - - - - - - - - - - 764.40 23,696.40 - - - - - -
4.03.04 SOLADO DE CONCRETO F´C=100 KG/CM2 E=0.10 M 5,528.94 - - - - - - - - - - 183.93 5,528.94 - - - - - -
4.03.05 CONCRETO F'C=210 KG/CM2 75,954.62 - - - - - - - - - - 190.63 75,954.62 - - - - - -
4.03.06 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL 4,772.56 - - - - - - - - - - 141.20 4,772.56 - - - - - -
4.03.07 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL 646.30 - - - - - - - - - - 12.73 646.30 - - - - - -
4.03.08 ACERO DE REFUERZO Fy=4200 KG/CM2 75,847.11 - - - - - - - - - - 13,968.16 75,847.11 - - - - - -
4.03.09 JUNTA WATER STOP 9" 2,316.39 - - - - - - - - - - 48.90 2,316.39 - - - - - -
4.03.10 REJILLA DE PROTECCION 337.67 - - - - - - - - - - 1.00 337.67 - - - - - -
4.03.11 TUBO HDPE 400MM SDR32 PN4 22,681.50 - - - - - - - - - - 150.00 22,681.50 - - - - - -
RECON. DE MGG
ADICIONAL DE OBRA N° ADICIONAL DE OBRA N° DEDUCTIVO DE OBRA N° DEDUCTIVO DE OBRA MONTO CONTRACTUAL
ADICIONAL DE OBRA N° 02 AMP. DE PLAZO
01 03 01 N° 02 MODIFICADO I
PRESUPUESTO CONTRACTUAL N° 09
Agosto Septiembre Octubre
Item DESCRIPCION PARCIAL S/. METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
Metrado Val. 01 Metrado Val. 02 Metrado Val. 03
4.03.12 VALVULA Ø400MM PN10, INC/ADITAMENTOS 21,712.52 - - - - - - - - - - 2.00 21,712.52 - - - - - -
4.03.13 PUERTA METALICA INC/VENTANA METALICA DE INSPECCION 1,293.16 - - - - - - - - - - 1.00 1,293.16 - - - - - -
4.04 ALIVIADERO DE DEMASIAS 1,016,714.61 - - 147,551.87 - 27,228.77 1,137,037.71 - - -
4.04.01 EXCAVACION EN MATERIAL SUELTO 19,370.84 - - - - - - - - 3,658.79 9,659.21 3,678.65 9,711.63 - - - - - -
EXCAVACION DE ZANJA EN ROCA A MANO - - - - - 2,937.89 108,349.38 - - - - 2,937.89 108,349.38 - - - - - -
4.04.02 RELLENO COMPACTADO PARA ESTRUCTURAS 59,947.80 - - - - - - - - 566.76 17,569.56 1,367.04 42,378.24 - - - - - -
ELIMINACION DE DESMONTE d=0.20 Km - - - - - 8,233.64 24,865.59 - - - - 8,233.64 24,865.59
4.04.03 SOLADO DE CONCRETO F´C=100 KG/CM2 E=0.10 M 37,069.99 - - - - - - - - - - 1,233.20 37,069.99 - - - - - -
4.04.04 CONCRETO F'C=210 KG/CM2 394,989.51 - - - - - - - - - - 991.34 394,989.51 - - - - - -
4.04.05 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL 91,453.67 - - - - 30.48 1,030.22 - - - - 2,736.21 92,483.89 - - - - - -
4.04.06 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL 2,516.16 - - - - - - - - - - 49.56 2,516.16 - - - - - -
4.04.07 ACERO DE REFUERZO Fy=4200 KG/CM2 388,848.76 - - - - - - - - - - 71,611.19 388,848.76 - - - - - -
4.04.08 JUNTA WATER STOP 9" 9,571.11 - - - - - - - - - - 202.05 9,571.11 - - - - - -
4.04.09 ENROCADO DE PROTECCION 12,442.35 - - - - - - - - - - 469.70 12,442.35 - - - - - -
4.04.10 BARANDA METALICA 343.40 - - - - - - - - - - 10.00 343.40 - - - - - -
SUB CIMIENTO fc= 100 kg/cm2 + 30% P.G. - - - - - 64.80 13,306.68 - - - - 64.80 13,306.68 - - - - - -
4.04.11 CONCRETO F'C=280KG/CM2 161.02 - - - - - - - - - - 0.33 161.02 - - - - - -
4.05 TROCHA CARROZABLE 201,981.48 - - - - - 201,981.48 - 11,352.00 2,196.22
4.05.01 EXCAVACION EN MATERIAL SUELTO 26,928.00 - - - - - - - - - - 10,200.00 26,928.00 - - 4,300.00 11,352.00 831.90 2,196.22
4.05.02 RELLENO COMPACTADO PARA ESTRUCTURAS 42,160.00 - - - - - - - - - - 1,360.00 42,160.00 - - - - - -
4.05.03 CONSTRUCCION DE TROCHA DE ACCESO A CANTERAS 132,893.48 - - - - - - - - - - 2.50 132,893.48 - - - - - -
5.00 LINEA DE CONDUCCION KM 0+000 AL 14+440 5,097,629.82 - 1,480,136.84 77,856.51 292,836.28 - 6,362,786.89 - - -
5.01 ACUEDUCTOS COLGANTES 260,953.79 - - - - - 260,953.79 - - -
5.01.01 EXCAVACION DE ZANJA EN MATERIAL SUELTO A MANO 535.49 - - - - - - - - - - 18.60 535.49 - - - - - -
5.01.02 EXCAVACION DE ZANJA EN ROCA A MANO 3,062.52 - - - - - - - - - - 83.04 3,062.52 - - - - - -
5.01.03 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL 2,701.58 - - - - - - - - - - 79.93 2,701.58 - - - - - -
5.01.04 ACERO DE REFUERZO Fy=4200 KG/CM2 7,650.48 - - - - - - - - - - 1,408.93 7,650.48 - - - - - -
5.01.05 CONCRETO F'C=210 KG/CM2 118,363.77 - - - - - - - - - - 297.07 118,363.77 - - - - - -
5.01.06 INSTALACIONES METALICAS CON PLATINAS DE ACERO A-36 28,257.36 - - - - - - - - - - 2,680.96 28,257.36 - - - - - -
5.01.07 PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 6.4MM 3,544.41 - - - - - - - - - - 459.12 3,544.41 - - - - - -
5.01.08 PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 11.5MM 1,116.52 - - - - - - - - - - 83.76 1,116.52 - - - - - -
5.01.09 PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 13.0MM 1,284.68 - - - - - - - - - - 93.16 1,284.68 - - - - - -
5.01.10 PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 16.0MM 3,289.50 - - - - - - - - - - 173.68 3,289.50 - - - - - -
5.01.11 PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 19.0MM 2,643.98 - - - - - - - - - - 109.80 2,643.98 - - - - - -
5.01.12 PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 26.0MM 5,750.31 - - - - - - - - - - 145.32 5,750.31 - - - - - -
5.01.13 PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 29.0MM 6,381.77 - - - - - - - - - - 141.44 6,381.77 - - - - - -
5.01.14 PROVISION E INSTALACION DE TUBERIA DE ACERO A-25 Ø16"x3/32" 70,386.27 - - - - - - - - - - 245.18 70,386.27 - - - - - -
5.01.15 EMPALME DE TUBERIAS HDPE - ACERO 4,972.66 - - - - - - - - - - 14.00 4,972.66 - - - - - -
5.01.16 FLETE RURAL CON DUMPER 1,012.49 - - - - - - - - - - 5,328.92 1,012.49 - - - - - -
5.02 LINEA DE CONDUCCION TRAMOS EN MATERIAL SUELTO 2,080,741.77 - - 77,856.51 286,987.78 - 1,871,610.50 - - -
5.02.01 EXCAVACION DE ZANJA EN MATERIAL SUELTO A MANO 370,084.22 - - - - - - 2,691.51 77,488.57 - - 10,163.10 292,595.65 - - - - - -
EXCAVACION EN MATERIAL SUELTO - - - - - 3,806.40 10,048.90 - - - - 3,806.40 10,048.90 - - - - - -
5.02.02 RELLENO CON MATERIAL ARENOSO 52,645.04 - - - - - - 811.40 29,543.07 - - 634.50 23,101.97 - - - - - -
5.02.03 TUBO HDPE 400MM SDR32 PN4 748,398.77 - - - - - - - - - - 4,949.40 748,398.77 - - - - - -
5.02.04 TUBO HDPE 355MM SDR32 PN4 153,928.23 - - - - - - - - - - 1,254.10 153,928.23 - - - - - -
5.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO A MANO 670,520.69 - - - - - - 6,546.24 179,956.14 - - 17,845.20 490,564.55 - - - - - -
RELLENO COMPACTADO PARA TERRAPLEN - - - - - 4,064.20 54,013.22 - - - - 4,064.20 54,013.22
ELIMINACION DE DESMONTE d=0.20 KM - - - - - 4,567.68 13,794.39 - - - - 4,567.68 13,794.39 - - - - - -
5.02.06 FLETE RURAL CON DUMPER 45,244.78 - - - - - - - - - - 238,130.40 45,244.78 - - - - - -
5.02.07 FLETE RURAL A MANO 39,920.04 - - - - - - - - - - 55,444.50 39,920.04 - - - - - -
5.03 LINEA DE CONDUCCION TRAMOS EN MATERIAL ROCOSO 2,203,868.53 - 124,669.89 - 5,848.50 - 2,322,689.92 - - -
5.03.01 EXCAVACION DE ZANJA EN ROCA A MANO 559,108.18 - - 3,380.42 124,669.89 - - - - - - 18,540.62 683,778.07 - - - - - -
5.03.02 RELLENO COMPACTADO CON MATERIAL GRAVO ARCILLOSO 28,140.14 - - - - - - 212.75 5,848.50 - - 810.90 22,291.64 - - - - - -
5.03.03b TUBO HDPE 400MM SDR32 PN4 733,459.23 - - - - - - - - - - 4,850.60 733,459.23 - - - - - -
5.03.03c TUBO HDPE 355MM SDR32 PN4 661,065.37 - - - - - - - - - - 5,385.90 661,065.37 - - - - - -
5.03.04 ANCLAJE EN TUBERIA 222,095.61 - - - - - - - - - - 2,559.00 222,095.61 - - - - - -
5.04 ACUEDUCTOS DE CONCRETO ARMADO (06 UND) 27,102.08 - - - - - 27,102.08 - - -
5.04.01 EXCAVACION DE ZANJA EN MATERIAL SUELTO A MANO 230.32 - - - - - - - - - - 8.00 230.32 - - - - - -
5.04.02 EXCAVACION DE ZANJA EN ROCA A MANO 537.12 - - - - - - - - - - 14.56 537.12 - - - - - -
5.04.03 RELLENO COMPACTADO CON MATERIAL PROPIO A MANO 40.14 - - - - - - - - - - 1.46 40.14 - - - - - -
5.04.04 SOLADO DE CONCRETO F´C=100 KG/CM2 E=0.10 M 353.51 - - - - - - - - - - 11.76 353.51 - - - - - -
5.04.05 CONCRETO F'C=210 KG/CM2 10,318.00 - - - - - - - - - - 25.90 10,318.00 - - - - - -
5.04.06 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL 2,325.44 - - - - - - - - - - 68.80 2,325.44 - - - - - -
5.04.07 ACERO DE REFUERZO Fy=4200 KG/CM2 3,116.04 - - - - - - - - - - 573.86 3,116.04 - - - - - -
RECON. DE MGG
ADICIONAL DE OBRA N° ADICIONAL DE OBRA N° DEDUCTIVO DE OBRA N° DEDUCTIVO DE OBRA MONTO CONTRACTUAL
ADICIONAL DE OBRA N° 02 AMP. DE PLAZO
01 03 01 N° 02 MODIFICADO I
PRESUPUESTO CONTRACTUAL N° 09
Agosto Septiembre Octubre
Item DESCRIPCION PARCIAL S/. METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
Metrado Val. 01 Metrado Val. 02 Metrado Val. 03
5.04.08 ANCLAJE EN TUBERIA 1,562.22 - - - - - - - - - - 18.00 1,562.22 - - - - - -
5.04.09 FLETE RURAL CON DUMPER 2,361.28 - - - - - - - - - - 12,427.79 2,361.28 - - - - - -
5.04.10 FLETE RURAL A MANO 6,258.01 - - - - - - - - - - 8,691.68 6,258.01 - - - - - -
5.05 CAMARA ROMPEPRESION (13 UND) 397,952.38 - - - - - 397,952.38 - - -
5.05.01 EXCAVACION DE ZANJA EN MATERIAL SUELTO A MANO 22,193.92 - - - - - - - - - - 770.89 22,193.92 - - - - - -
5.05.02 EXCAVACION DE ZANJA EN ROCA A MANO 24,369.20 - - - - - - - - - - 660.77 24,369.20 - - - - - -
5.05.03 SOLADO DE CONCRETO F´C=100 KG/CM2 E=0.10 M 3,764.71 - - - - - - - - - - 125.24 3,764.71 - - - - - -
5.05.04 CONCRETO F'C=210 KG/CM2 213,842.75 - - - - - - - - - - 536.70 213,842.75 - - - - - -
5.05.05 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL 38,772.66 - - - - - - - - - - 1,147.12 38,772.66 - - - - - -
5.05.06 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL 5,940.09 - - - - - - - - - - 117.00 5,940.09 - - - - - -
5.05.07 ACERO DE REFUERZO Fy=4200 KG/CM2 50,373.73 - - - - - - - - - - 9,276.93 50,373.73 - - - - - -
5.05.08 COMPUERTA METALICA 0.4 x 0.40 M 15,259.50 - - - - - - - - - - 6.00 15,259.50 - - - - - -
5.05.10 ESCALINES 1,950.00 - - - - - - - - - - 130.00 1,950.00 - - - - - -
5.05.11 RELLENO COMPACTADO CON MATERIAL PROPIO A MANO 10,779.38 - - - - - - - - - - 392.12 10,779.38 - - - - - -
5.05.12 FLETE RURAL CON DUMPER 3,991.90 - - - - - - - - - - 21,010.02 3,991.90 - - - - - -
5.05.13 FLETE RURAL A MANO 6,714.54 - - - - - - - - - - 9,325.75 6,714.54 - - - - - -
5.06 CAPTACION DE QUEBRADAS ( 07 UND) 127,011.27 - - - - - 127,011.27 - - -
5.06.01 EXCAVACION DE ZANJA EN MATERIAL SUELTO A MANO 1,052.56 - - - - - - - - - - 36.56 1,052.56 - - - - - -
5.06.02 EXCAVACION DE ZANJA EN ROCA A MANO 2,043.23 - - - - - - - - - - 55.40 2,043.23 - - - - - -
5.06.03 RELLENO COMPACTADO CON MATERIAL PROPIO A MANO 557.35 - - - - - - - - - - 20.27 557.35 - - - - - -
5.06.04 SOLADO DE CONCRETO F´C=100 KG/CM2 E=0.10 M 1,399.59 - - - - - - - - - - 46.56 1,399.59 - - - - - -
5.06.05 CONCRETO F'C=210 KG/CM2 37,142.13 - - - - - - - - - - 93.22 37,142.13 - - - - - -
5.06.06 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL 12,288.67 - - - - - - - - - - 363.57 12,288.67 - - - - - -
5.06.07 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL 37.32 - - - - - - - - - - 0.74 37.32 - - - - - -
5.06.08 ACERO DE REFUERZO Fy=4200 KG/CM2 16,884.26 - - - - - - - - - - 3,109.44 16,884.26 - - - - - -
5.06.09 COMPUERTA METALICA 0.3 x 0.30 M 27,602.68 - - - - - - - - - - 14.00 27,602.68 - - - - - -
5.06.10 ATAGUIA DE MADERA 0.50 x 0.30 M 1,992.41 - - - - - - - - - - 7.00 1,992.41 - - - - - -
5.06.11 TUBO HDPE 200MM SDR32 PN4 16,867.06 - - - - - - - - - - 266.00 16,867.06 - - - - - -
5.06.12 FLETE RURAL CON DUMPER 9,144.01 - - - - - - - - - - 48,126.36 9,144.01 - - - - - -
05.07 PLATAFORMA DE TRABAJO (PARTIDA NUEVAS) - - 1,355,466.95 - - - 1,355,466.95 - - -
05.07.01 CORTE EN MATERIAL SUELTO A MAQUINA - - - 22,027.94 166,531.23 - - - - - - 22,027.94 166,531.23 - - - - - -
05.07.02 CORTE EN ROCA SUELTA A MAQUINA - - - 7,225.68 180,642.00 - - - - - - 7,225.68 180,642.00 - - - - - -
05.07.03 CORTE EN ROCA FIJA A MAQUINA - - - 26,657.10 879,684.30 - - - - - - 26,657.10 879,684.30 - - - - - -
05.07.04 RELLENO COMPACTADO PARA TERRAPLEN (Accesos) - - - 6,948.50 75,599.68 - - - - - - 6,948.50 75,599.68 - - - - - -
05.07.05 ELIMINACION DE MATERIAL SATURADO - - - 1,734.00 12,259.38 - - - - - - 1,734.00 12,259.38 - - - - - -
05.07.06 PERFILADO Y COMPACTADO SUBRASANTE ZONAS DE CORTE - - - 34,244.00 40,750.36 - - - - - - 34,244.00 40,750.36 - - - - - -
6.00 MITIGACION DEL MEDIO AMBIENTE 297,867.35 - - - - - 297,867.35 - - -
6.01 MITIGACION DEL MEDIO AMBIENTE 297,867.35 - - - - - - - - - - 1.00 297,867.35 - - - - - -
7.00 CAPACITACION 27,399.99 - - - - - 27,400.00 - - -
7.01 CAPACITACION 27,400.00 - - - - - - - - - - 1.00 27,400.00 - - - - - -
COSTO DIRECTO 21,718,671.23 197,127.06 1,480,136.84 674,279.57 292,836.28 27,228.77 23,750,149.65 - - 88,362.46 173,062.82
GASTOS GENERALES 1,737,493.70 18,233.19 96,716.55 - 23,426.90 2,178.30 21,837.16 1,848,675.40 - - 7,069.00 13,845.03
UTILIDAD 1,085,933.56 9,856.35 74,006.84 33,713.98 14,641.81 1,361.44 1,187,507.48 - - 4,418.12 8,653.14
SUBTOTAL 24,542,098.49 225,216.60 1,650,860.23 707,993.55 330,904.99 30,768.51 21,837.16 26,786,332.53 - - 99,849.58 195,560.99
IGV 4,417,577.73 40,538.99 297,154.84 127,438.84 59,562.90 5,538.33 3,930.69 4,821,539.86 - - 17,972.92 35,200.98
COSTO TOTAL 28,959,676.22 265,755.59 1,948,015.07 835,432.39 390,467.89 36,306.84 25,767.85 31,607,872.39 - - 117,822.50 230,761.97
ANEXO N° 01
PRESUPUESTO DEL SALDO DEL PIP Y PARTIDAS VALORIZADAS
CONSTRUCCION DE SISTEMA DE RIEGO CUSHUROCOCHA -HUARCO CURAN - CAJACAY, PROVINCIA DE BOLOGNESI, ANCASH
Noviembre Diciembre Enero Febrero Marzo Abril Mayo Junio Julio Agosto Septiembre Octubre Noviembre
Metrado Val. 04 Metrado Val. 05 Metrado Val. 06 Metrado Val. 07 Metrado Val. 08 Metrado Val. 09 Metrado Val. 10 Metrado Val. 11 Metrado Val. 12 Metrado Val. 13 Metrado Val. 14 Metrado Val. 15 Metrado
11,698.96 9,380.56 8,086.70 8,086.70 8,086.70 8,086.70 2,021.68 8,086.70 8,086.70 2,021.68 2,021.68 2,021.68
0.15 3,612.26 - - - - - - - - - - - - - - - - - - - - - - -
1.00 8,086.70 1.00 8,086.70 1.00 8,086.70 1.00 8,086.70 1.00 8,086.70 1.00 8,086.70 0.25 2,021.68 1.00 8,086.70 1.00 8,086.70 0.25 2,021.68 0.25 2,021.68 0.25 2,021.68 -
- - 1.00 1,293.86 - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - 8,569.25 - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 5.00 8,569.25 - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
537,214.46 442,396.85 620,096.76 334,692.08 265,892.24 175,805.94 82,309.43 160,304.40 187,450.43 43,726.67 - 69,786.54
156,525.01 165,259.73 328,649.71 48,401.37 125,658.53 - - - 15,677.97 - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
492.60 1,300.46 106.36 280.79 - - - - - - - - - - - - - - - - - - - - -
- - - - - -
- - - - - -
- - - - - -
739.70 22,930.70 - - - - - - - - - - - - - - - - - - - - - - -
213.20 6,408.79 278.20 8,362.69 76.44 2,297.79 66.28 1,992.38 11.80 354.71 - - - - - - - - - - - - - - -
212.52 7,183.18 420.42 14,210.20 1,048.74 35,447.41 44.91 1,517.96 513.94 17,371.17 - - - - - - - - - - - - - - -
55.75 2,830.43 110.29 5,599.42 275.08 13,965.81 - - 51.99 2,639.53 - - - - - - - - - - - - - - -
14,066.63 76,381.80 12,133.39 65,884.31 17,082.01 92,755.31 6,002.06 32,591.19 9,808.45 53,259.88 - - - - - - - - - - - - - - -
76.80 3,638.02 - - 153.60 7,276.03 - - 4.60 217.90 - - - - - - - - - - - - - - -
89.98 35,851.63 178.00 70,922.32 444.00 176,907.36 30.87 12,299.84 125.74 50,099.85 - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 569.28 15,677.97 - - - - - - -
- - - - - - - - 64.76 1,715.49 - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
208,203.41 277,137.12 291,447.05 286,290.71 140,233.71 - - 78,596.32 36,918.90 - - -6,282.44
- - - - - - - - - - - - - - - - - - - - - - -712.67 -1,475.23 -
13,592.40 35,883.94 1,722.43 4,547.22 - - 4,652.78 12,283.34 - - - - - - - - - - - - - - - - -
618.64 6,557.58 535.38 5,675.03 - - 72.84 772.10 - - - - - - - - - - - - - - -453.51 -4,807.21 -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
280.00 73,883.60 30.00 7,916.10 - - - - - - - - - - - - - - - - - - - - -
117.75 31,070.69 781.57 206,232.88 1,104.51 291,447.05 344.80 90,982.38 531.45 140,233.71 - - - - - - - - - - - - - - -
- - - - - - 108.77 28,701.14 - - - - - - 297.86 78,596.32 - - - - - - - - -
280.00 60,807.60 30.00 6,515.10 - - - - - - - - - - - - 170.00 36,918.90 - - - - - - -
- - - - - - 162.26 142,436.70 - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - 15,314.83 46,250.79 - - 3,680.48 11,115.05 - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - 18,533.85 55,520.61 21,101.05 - 962.95
- - - - - - - - - - - - - - 841.85 1,742.63 - - - - - - - - -
- - - - - - - - - - - - - - 1,114.24 2,941.59 - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - 121.04 3,638.46 - - 15.64 470.14 - - - - -
- - - - - - - - - - - - - - - - 37.31 14,865.80 27.98 11,148.35 - - - - -
- - - - - - - - - - - - - - - - 81.15 2,742.87 35.00 1,183.00 - - 25.05 846.69 -
- - - - - - - - - - - - - - - - - - 10.44 530.04 - - 2.29 116.26 -
- - - - - - - - - - - - - - 1,880.51 10,211.17 6,576.46 35,710.18 1,430.85 7,769.52 - - - - -
- - - - - - - - - - - - - - - - 46.48 2,201.76 - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
ANEXO N° 01
PRESUPUESTO DEL SALDO DEL PIP Y PARTIDAS VALORIZADAS
CONSTRUCCION DE SISTEMA DE RIEGO CUSHUROCOCHA -HUARCO CURAN - CAJACAY, PROVINCIA DE BOLOGNESI, ANCASH
Noviembre Diciembre Enero Febrero Marzo Abril Mayo Junio Julio Agosto Septiembre Octubre Noviembre
Metrado Val. 04 Metrado Val. 05 Metrado Val. 06 Metrado Val. 07 Metrado Val. 08 Metrado Val. 09 Metrado Val. 10 Metrado Val. 11 Metrado Val. 12 Metrado Val. 13 Metrado Val. 14 Metrado Val. 15 Metrado
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - 175,805.94 82,309.43 63,174.23 79,332.95 6,678.40 - 75,106.03
- - - - - - - - - - 4,185.21 11,048.95 - - - - 3,054.54 8,063.99 - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - 112.00 3,472.00 - - 94.55 2,931.05 - - - - - - - - -
- - - - - - - - - - 672.37 20,211.44 - - 93.92 2,823.24 120.00 3,607.20 114.00 3,426.84 - - 122.78 3,690.77 -
- - - - - - - - - - 30.58 12,184.30 163.13 64,997.52 117.85 46,956.15 - - - - - - 128.74 51,295.17 -
- - - - - - - - - - 120.92 4,087.10 543.58 18,373.00 262.49 8,872.16 - - 96.20 3,251.56 - - 169.87 5,741.61 -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - 22,006.76 119,496.71 - - - - 12,460.73 67,661.76 - - - - 2,647.97 14,378.48 -
- - - - - - - - - - 112.00 5,305.44 -22.40 -1,061.09 33.60 1,591.63 - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
172,486.04 - - - - - - - - 15,947.22 - -
5,068.10 13,379.78 - - - - - - - - - - - - - - - - - - - - - - -
1,360.00 42,160.00 - - - - - - - - - - - - - - - - - - - - - - -
2.20 116,946.26 - - - - - - - - - - - - - - - - 0.30 15,947.22 - - - - -
374,608.13 589,070.92 196,792.79 - - - - - - 11,064.00 303,962.47 424,759.38
- - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
334,202.03 589,070.92 144,622.34 - - - - - - - 272,039.77 144,535.93
3,580.85 103,092.67 3,590.73 103,377.12 1,292.95 37,224.03 - - - - - - - - - - - - - - 710.40 20,452.42 988.17 28,449.41 -
- - - - - - - - - - - - - - - - - - - - - - - - -
750.00 27,307.50 695.90 25,337.54 -1,133.15 -41,257.99 - - - - - - - - - - - - - - 84.60 3,080.29 54.09 1,969.42 -
996.00 150,605.16 2,309.00 349,143.89 550.00 83,165.50 - - - - - - - - - - - - - - 1,094.40 165,484.22 - - -
- - - - - - - - - - - - - - - - - - - - 380.00 46,641.20 150.00 18,411.00 -
1,371.65 37,706.66 3,672.55 100,958.40 2,293.50 63,048.32 - - - - - - - - - - - - - - 1,323.45 36,381.64 3,271.91 89,944.81 -
- - - - - - - - - - - - - - - - - - - - - - - - -
43,707.51 8,304.43 53,968.26 10,253.97 12,855.15 2,442.48 - - - - - - - - - - - - - - - - 30,322.57 5,761.29 -
9,980.01 7,185.61 - - - - - - - - - - - - - - - - - - - - - - -
40,406.10 - 52,170.45 - - - - - - 11,064.00 31,922.70 249,753.99
1,095.61 40,406.10 - - 1,414.60 52,170.45 - - - - - - - - - - - - 300.00 11,064.00 804.20 29,658.90 921.00 33,966.48 -
- - - - - - - - - - - - - - - - - - - - 82.35 2,263.80 57.60 1,583.42 -
- - - - - - - - - - - - - - - - - - - - - - 1,416.60 214,204.09 -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
ANEXO N° 01
PRESUPUESTO DEL SALDO DEL PIP Y PARTIDAS VALORIZADAS
CONSTRUCCION DE SISTEMA DE RIEGO CUSHUROCOCHA -HUARCO CURAN - CAJACAY, PROVINCIA DE BOLOGNESI, ANCASH
Noviembre Diciembre Enero Febrero Marzo Abril Mayo Junio Julio Agosto Septiembre Octubre Noviembre
Metrado Val. 04 Metrado Val. 05 Metrado Val. 06 Metrado Val. 07 Metrado Val. 08 Metrado Val. 09 Metrado Val. 10 Metrado Val. 11 Metrado Val. 12 Metrado Val. 13 Metrado Val. 14 Metrado Val. 15 Metrado
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - 30,469.46
- - - - - - - - - - - - - - - - - - - - - - 330.38 9,511.64 -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - 34.16 1,026.85 -
- - - - - - - - - - - - - - - - - - - - - - 8.54 3,402.68 -
- - - - - - - - - - - - - - - - - - - - - - 10.88 367.74 -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - 2,976.16 16,160.55 -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
47,658.78 11,914.69 5,957.35 5,957.35 - 17,872.04 - - - - - -
0.16 47,658.78 0.04 11,914.69 0.02 5,957.35 0.02 5,957.35 - - 0.06 17,872.04 - - - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
971,180.33 1,052,763.02 830,933.60 348,736.13 273,978.94 201,764.68 84,331.11 168,391.10 204,106.38 56,812.35 305,984.15 496,567.60
77,694.43 84,221.04 66,474.69 27,898.89 21,918.32 16,141.17 6,746.49 13,471.29 16,328.51 4,544.99 24,478.73 39,725.41
48,559.02 52,638.15 41,546.68 17,436.81 13,698.95 10,088.23 4,216.56 8,419.56 10,205.32 2,840.62 15,299.21 24,828.38
1,097,433.78 1,189,622.21 938,954.97 394,071.83 309,596.21 227,994.08 95,294.16 190,281.95 230,640.21 64,197.96 345,762.09 561,121.39
197,538.08 214,132.00 169,011.89 70,932.93 55,727.32 41,038.93 17,152.95 34,250.75 41,515.24 11,555.63 62,237.18 101,001.85
1,294,971.86 1,403,754.21 1,107,966.86 465,004.76 365,323.53 269,033.01 112,447.11 224,532.70 272,155.45 75,753.59 407,999.27 662,123.24
NCASH
Noviembre Diciembre Enero Febrero Marzo Abril TOTAL 2014 Octubre TOTAL 2014 Agosto 2014 Setiembre 2014 Octubre 2014 Diciembre 2015 Enero
Val. 16 Metrado Val. 17 Metrado Val. -- Metrado Val. -- Metrado Val. 18 Metrado Val. 19 Metrado Val. 1 Metrado Val. 1 Metrado Val. 2 Metrado Val. 3 Metrado Val. 5 Metrado Val. 6
- - - - 8,086.70 - 111,579.24 - 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - - - 13,244.96 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 1.00 8,086.70 - - 97,040.42 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 1,293.86 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- 1,713.85 - - 1,713.85 - 47,609.55 - - 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - - - 35,612.60 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- 1.00 1,713.85 - - - - 1.00 1,713.85 - - 11,996.95 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- 30,540.96 - - 112,739.01 33,506.36 3,296,468.71 86,875.14 86,875.14 0.00 0.00 0.00 0.00 0.00
- - - - - - 949,841.57 - - 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - - - 3,620.43 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 2,738.76 - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 22,930.70 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 19,416.36 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 75,729.92 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 25,035.19 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 425,763.80 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 11,131.95 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 346,081.00 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 15,677.97 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 1,715.49 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- -4,807.21 - - - - 1,384,526.68 86,875.14 86,875.14 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - - - 75,313.88 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 52,714.50 - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- -453.51 -4,807.21 - - - - - - - - 3,390.29 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 81,799.70 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 759,966.71 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 107,297.46 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 104,241.60 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 142,436.70 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - 114.68 86,875.14 86,875.14 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 57,365.84 - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 51,971.20 16,981.13 165,070.79 - - - - - - -
- - - - - - - - - - - 1,742.63 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 2,941.59 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 4,108.60 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 53.30 21,236.85 23.64 9,419.12 56,670.12 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 4,772.56 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 646.30 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 2,457.68 13,345.20 563.59 3,060.29 70,096.36 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - 7.41 351.01 2,552.77 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 115.00 17,389.15 27.45 4,150.71 21,539.86 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
NCASH
Noviembre Diciembre Enero Febrero Marzo Abril TOTAL 2014 Octubre TOTAL 2014 Agosto 2014 Setiembre 2014 Octubre 2014 Diciembre 2015 Enero
Val. 16 Metrado Val. 17 Metrado Val. -- Metrado Val. -- Metrado Val. 18 Metrado Val. 19 Metrado Val. 1 Metrado Val. 1 Metrado Val. 2 Metrado Val. 3 Metrado Val. 5 Metrado Val. 6
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- 35,348.17 - - 60,767.81 16,525.23 595,048.19 - - - - - - -
- -3,561.10 -9,401.30 - - - - - - - - 9,711.64 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 6,403.05 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 33,759.49 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- 76.42 30,448.78 - - - - 56.36 22,456.08 32.00 12,750.08 241,088.08 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- 274.99 9,294.66 - - - - 354.23 11,972.97 23.20 784.16 62,377.22 - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- 921.92 5,006.03 - - - - 4,850.60 26,338.76 463.59 2,517.29 235,399.03 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - 10.00 473.70 6,309.68 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - 201,981.48 - - - - -
- - - - - - - - - - - 26,928.00 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 42,160.00 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 132,893.48 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- -1,088.82 - - 119,722.43 34,688.92 2,053,580.22 - 198,029.32 15,180.54 171,794.52 84,310.31 64,437.00
- - - - - - - - - - - - - -
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 2,087.21 - 1,486,558.20 - - - - - -
- - - - - - - - - - - 292,595.65 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 16,436.76 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 748,398.77 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 65,052.20 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 328,039.83 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 10,985.31 2,087.21 - - 28,849.38 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 7,185.61 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 84,625.82 21,977.90 491,920.96 - - - - -
- - - - - - - 335.40 12,369.55 595.93 21,977.90 201,613.38 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 43.20 1,187.57 - - 5,034.79 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 470.00 71,068.70 - - 285,272.79 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - -
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
NCASH
Noviembre Diciembre Enero Febrero Marzo Abril TOTAL 2014 Octubre TOTAL 2014 Agosto 2014 Setiembre 2014 Octubre 2014 Diciembre 2015 Enero
Val. 16 Metrado Val. 17 Metrado Val. -- Metrado Val. -- Metrado Val. 18 Metrado Val. 19 Metrado Val. 1 Metrado Val. 1 Metrado Val. 2 Metrado Val. 3 Metrado Val. 5 Metrado Val. 6
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- -1,088.82 - - 20,558.43 12,711.02 62,650.09 - - - - -
- - - - - - - - - - - 9,511.64 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - 36.28 1,338.01 1,338.01 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - 1,026.85 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 18.23 7,263.56 21.04 8,383.18 19,049.42 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 175.14 5,919.73 82.89 2,801.68 9,089.15 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- -200.52 -1,088.82 - - - - 1,358.22 7,375.14 34.65 188.15 22,635.02 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - 12,450.97 - 12,450.97 - - - - -
- - - - - - - 36.56 1,052.56 - - 1,052.56 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 26.48 795.99 - - 795.99 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 14.27 5,685.74 - - 5,685.74 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 33.05 1,117.09 - - 1,117.09 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 699.74 3,799.59 - - 3,799.59 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - 198,029.32 15,180.54 171,794.52 84,310.31 64,437.00
- - - - - - - - - - - - - 12,985.73 98,172.12 379.00 2,865.24 4,712.96 35,629.98 988.68 7,474.42 - 0.00
- - - - - - - - - - - - - 1,748.50 43,712.50 344.10 8,602.50 1,906.60 47,665.00 428.10 10,702.50 60.90 1,522.50
- - - - - - - - - - - - - 692.70 22,859.10 - 0.00 1,219.29 40,236.57 1,867.80 61,637.40 1,906.50 62,914.50
- - - - - - - - - - - - - 1,516.70 16,501.70 - 0.00 2,088.20 22,719.62 1,296.45 14,105.38 - 0.00
- - - - - - - - - - - - - 1,086.00 7,678.02 - 0.00 - 0.00 648.00 4,581.36 - 0.00
- - - - - - - - - - - - - 7,652.00 9,105.88 3,120.00 3,712.80 21,465.00 25,543.35 -11,925.00 -14,190.75 - 0.00
- - - - - - 89,360.21 - - - - -
- - - - - - - - - - - 89,360.21 - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- - - - - - - - - - - -
- - - - - - - - - - - - - - 0.00 - 0.00 - 0.00 - 0.00 - 0.00
- 31,165.99 - - 242,261.99 68,195.28 5,598,597.93 86,875.13 86,875.13 198,029.32 15,180.54 171,794.52 84,310.31 64,437.00
- 2,493.28 - - 19,380.96 5,455.62 447,887.83 8,035.44 8,035.44 12,939.83 991.94 11,225.57 5,509.09 4,210.51
- 1,558.30 - - 12,113.10 3,409.76 279,929.90 4,343.76 4,343.76 9,901.47 759.03 8,589.73 4,215.52 3,221.85
- 35,217.57 - - 273,756.05 77,060.66 6,326,415.66 99,254.33 99,254.33 220,870.62 16,931.51 191,609.82 94,034.92 71,869.36
- 6,339.16 - - 49,276.09 13,870.92 1,138,754.82 17,865.78 17,865.78 39,756.71 3,047.67 34,489.77 16,926.29 12,936.48
- 41,556.73 - - 323,032.14 90,931.58 7,465,170.48 117,120.11 117,120.11 260,627.33 19,979.18 226,099.59 110,961.21 84,805.84
7,465,170.51 533,751.69
595,316.23
VALORIZACION DE ADICIONAL N° 03 VALORIZACIONES TOTALES SALDO
9,120,196.13
0.05
ITEM DESCRIPCION
1061
330
45
1436
ITEM
02.01.03
02.05.01.06
02.05.01.07
02.05.01.08
02.05.03.09
DESCRIPCION UND METRADO
INVERSION TOTAL (S/.) 14,608,697.57 7,796,781.81 46,911,924.67 54,708,706.48 1,726,295.73 169,611.10 56,604,613.31 14,608,697.57 56,604,613.31 41,995,915.74 287.47%
ANEXO N° 4
CUADRO DE AVANCE FISICO Y CUADRO COMPARATIVO DE METRADOS
"Construcción del Sistema de Riego Cushurococha - Huarco Curan - Cajacay"
Expediente técnico o Estudio
PIP Viable Expediente técnico/Estudio definitivo 1/
definitivo Modificado2/
Componentes/Metas asociadas a la capacidad de producción del servicio
Unidad de Unidad de % Avance Meta Adicional Meta a Unidad de Cantidad (D) =
Cantidad Cantidad (A)
Medida Medida físico (B) reducir (C) Medida (A) + (B)- (C )
ESTRUCTURA DE SERVICIO 0
OBRAS DE TOMA
CASA DE VALVULAS
MOVIMIENTO DE TIERRAS
EXCAVACIÓN CON EQUIPO PARA ESTRUCTURA - MATERIAL SUELTO m3
RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO m3
ELIMINACIÓN DE MATERIAL EXCEDENTE - DISTANCIA DE TRANSPORTE m3
CONCRETO SIMPLE (DADOS DE CONCRETO)
CONCRETO F'C=210 Kg/cm2 PARA ESTRUCTURAS - DIST.MAX m3
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS m2
ACERO DE REFUERZO Fy=4200 kg/cm2 kg
VARIOS
ESCALINES DE FºGº DE 1/2 - ESCALERA DE GATO u
SUMINISTRO E INSTALACIÓN DE VALVULA DE 20" u
PLANCHAS DE FIERRO ESTRIADO m2
CONSTRUCCIÓN DE CASETAS DE VALVULAS m2
POZA DE IMPACTO
MOVIMIENTO DE TIERRAS
EXCAVACIÓN CON EQUIPO PARA ESTRUCTURA - MATERIAL SUELTO m3
ELIMINACIÓN DE MATERIAL EXCEDENTE - DISTANCIA DE TRANSPORTE m3
CONCRETO SIMPLE (DADOS DE CONCRETO)
CONCRETO F'C=210 Kg/cm2 PARA ESTRUCTURAS - DIST.MAX m3
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS m2
ACERO DE REFUERZO Fy=4200 kg/cm2 kg
LIMPIEZA Y DESBROCE DE TERRENO E=0.5 M. M2
EXCAVACION EN MATERIAL SUELTO M3
RELLENO COMPACTADO PARA ESTRUCTURAS M3
SOLADO DE CONCRETO F´C=100 KG/CM2 E=0.10 M M2
CONCRETO F'C=210 KG/CM2 M3
ENCOFRADO Y DESENCOFRADO PLANO VERTICAL M2
ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL M2
ACERO DE REFUERZO Fy=4200 KG/CM2 KG
JUNTA WATER STOP 9" M
REJILLA DE PROTECCION M2
TUBO HDPE 400MM SDR32 PN4 M
VALVULA Ø400MM PN10, INC/ADITAMENTOS UND
PUERTA METALICA INC/VENTANA METALICA DE INSPECCION UND
CONSTRUCCIÓN DE ESTRUCTURA FALTANTE glb
ALIVIADERO DE DEMASIAS 0
EXCAVACION EN MATERIAL SUELTO M3
EXCAVACION DE ZANJA EN ROCA A MANO M3
RELLENO COMPACTADO PARA ESTRUCTURAS M3
RELLENO CON MATERIAL DE FILTRO - DIST. MAX. TRANS. DE MATERIALES m3
ELIMINACION DE DESMONTE d=0.20 Km m3
SOLADO DE CONCRETO F´C=100 KG/CM2 E=0.10 M M2
CONCRETO F'C=210 KG/CM2 M3
CONCRETO F'C=350 Kg/cm2 PARA ESTRUCTURAS - DIST.MAX m2
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS m2
ENCOFRADO Y DESENCOFRADO PLANO VERTICAL M2
ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL M2
ACERO DE REFUERZO Fy=4200 KG/CM2 KG
SUMINISTRO E INSTALACIÓN DE TUBERIA HDPE DE 6" DE DIAMETRO m
JUNTA WATER STOP 9" M
ENROCADO DE PROTECCION M3
BARANDA METALICA M
SUB CIMIENTO fc= 100 kg/cm2 + 30% P.G. m3
CONCRETO F'C=280KG/CM2 M3
AMPLIACION DE POZA
RELLENO COMPACTADO PARA ESTRUCTURAS m3
PICADO DE CONCRETO m3
TRATAMINETO CON RESINA EPOXICA m2
SOLADOS CONCRETO f'c=100 kg/cm2 h=0.10m m2
REAJUSTES Y REINTEGROS
"CONSTRUCCIÓN DEL SISTEMA DE RIEGO CUSHUROCOCHA - HUARCO CURAN - CAJACAY"
PRESAS
01 REPRESAMIENTO LAGUNA CUSHUROCOCHA
01.01 OBRAS PRELIMINARES
01.01.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS - PRESA
01.01.02 CONSTRUCCIÓN DE CAMPAMENTO, ALMACENES, TALLERES, ETC
01.01.03 CARTEL DE IDENTIFICACIÓN DE LA OBRA
01.01.04 ENTIVAMIENTO PARA EXCAVACIÓN
01.01.05 TRAZO Y REPLANTEO
01.01.06 LIMPIEZA Y DESBROCE DE TERRENO MANUAL
01.02 PRESA
01.02.01 MOVIMIENTO DE TIERRAS
01.02.02 EXCAVACIÓN MANUAL EN TERRENO SUELTO
01.02.03 EXCAVACIÓN MANUAL EN ROCA SUELTA
01.02.04 EXCAVACIÓN MANUAL EN ROCA FIJA
01.02.05 RELLENO COMPACTADO A MANO CON MATERIAL PERMEABLE
01.02.06 ELIMINACIÓN DE MATERIAL EXCEDENTE
01.02.07 ENROCADO
01.02.08 SUMINISTRO E INSTALACIÓN DE GEOMENBRANA PVC DE 2 MM
01.03 OBRAS DE TOMA
01.03.01 CASA DE VALVULAS Y TUBERIAS
01.03.01.01 MOVIMIENTO DE TIERRAS
01.03.01.01 EXCAVACIÓN PARA ESTRUCTURAS - MATERIAL SUELTO A MANO
01.03.01.01 EXCAVACIÓN EN ROCA FIJA
01.03.01.01 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO
01.03.01.01 RELLENO COMPACTADO A MANO CON ARCILLA IMPERMEABILIZANTE
01.03.01.02 CONCRETO
01.03.01.02 CONCRETO F`C = 210 Kg/cm2 RENDIMIENTO 16M3/DIA
01.03.01.02 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA
01.03.01.02 ACERO DE REFUERZO fY =4200 kg/cm2
01.03.01.03 TUBERIA Y VALVULAS
01.03.01.03 SUMINISTRO E INSTALACIÓN DE TUBERIA HDPE A 10 DE 12" DE DIAMETRO
01.03.01.03 SUMINISTRO E INSTALACIÓN DE VALVULA DE FIERRO FUNDIDO
01.03.01.03 PLANCHAS DE FIERRO ESTRIADA 1/8x6x6
01.03.01.03 CONSTRUCCIÓN DE CASETAS DE VALVULAS
01.03.01.04 POZA DE IMPACTO
01.03.01.04 CONCRETO F'C = 350Kg/cm2 para lozas
01.03.01.04 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA
01.03.01.04 ACERO DE REFUERZO fY =4200 kg/cm2
01.04 ALIVIADERO DE DEMASIAS
01.04.01 MOVIMIENTO DE TIERRAS
01.04.01.01 EXCAVACIÓN MANUAL EN ROCA FIJA
01.04.02 CONCRETO ARMADO
01.04.02.01 CONCRETO F'C = 350Kg/cm2 para lozas
01.04.02.02 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA
01.04.02.03 ACERO DE REFUERZO fY =4200 kg/cm2
02 REPRESAMIENTO UNIONPAMPA
02.01 OBRAS PRELIMINARES
02.01.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS - PRESA
02.01.02 DESVIO PROVISIONAL
02.01.03 TRAZO Y REPLANTEO
02.01.04 DESBROCE Y LIMPIEZA DEL TERRENO
02.03.03 CANAL DE ENCAUZAMIENTO
02.03.03.04 MOVIMIENTO DE TIERRAS
02.02.02 VARIOS/IMPERMEABILIZACION
02.02.02.01 SUMINISTRO E INSTALACIÓN DE GEOTEXTIL
ESTRUCTURA DE SERVICIO
02.03 OBRAS DE TOMA
02.03.01 CASA DE VALVULAS
02.03.01.01 MOVIMIENTO DE TIERRAS
02.03.01.01 EXCAVACIÓN CON EQUIPO PARA ESTRUCTURA - MATERIAL SUELTO
02.03.01.01 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO
02.03.01.01 ELIMINACIÓN DE MATERIAL EXCEDENTE - DISTANCIA DE TRANSPORTE
02.03.01.02 CONCRETO SIMPLE (DADOS DE CONCRETO)
02.03.01.02 CONCRETO F'C=210 Kg/cm2 PARA ESTRUCTURAS - DIST.MAX
02.03.01.02 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS
02.03.01.02 ACERO DE REFUERZO Fy=4200 kg/cm2
02.03.01.03 VARIOS
02.03.01.03 ESCALINES DE FºGº DE 1/2 - ESCALERA DE GATO
02.03.01.03 SUMINISTRO E INSTALACIÓN DE VALVULA DE 20"
02.03.01.03 PLANCHAS DE FIERRO ESTRIADO
02.03.01.03 CONSTRUCCIÓN DE CASETAS DE VALVULAS
02.03.02 POZA DE IMPACTO
02.03.02.01 MOVIMIENTO DE TIERRAS
02.03.02.01 EXCAVACIÓN CON EQUIPO PARA ESTRUCTURA - MATERIAL SUELTO
02.03.02.01 ELIMINACIÓN DE MATERIAL EXCEDENTE - DISTANCIA DE TRANSPORTE
02.03.02.02 CONCRETO SIMPLE (DADOS DE CONCRETO)
02.03.02.02 CONCRETO F'C=210 Kg/cm2 PARA ESTRUCTURAS - DIST.MAX
02.03.02.02 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS
02.03.02.02 ACERO DE REFUERZO Fy=4200 kg/cm2
REAJUSTES Y REINTEGROS
COSTO DIRECTO
GASTOS GENERALES (5% CD)
UTILIDADES (4% C.D)
SUBTOTAL
IGV (19%)
TOTAL
ARCO CURAN - CAJACAY"
PRESU
Und. Metrado Precio S/. Parcial S/.
1.00
1.01
1.02
1.03
2.00
2.01
2.02
3.00
3.01
6,639,941.91
313,258.46
24,504.80
est 1.00 5,789.20 5,789.20
m2 100.00 82.25 8,225.00
u 1.00 780.60 780.60
u 1.00 2,800.00 2,800.00
m2 2,500.00 0.42 1,050.00
m2 2,000.00 2.93 5,860.00
184,646.20
184,646.20
m3 1,293.60 3.83 4,954.49
m3 517.44 4.94 2,556.15
m3 776.16 17.98 13,955.36
m3 2,212.00 42.90 94,894.80
m3 1,293.60 1.75 2,263.80
m3 2,387.00 24.95 59,555.65
m2 787.57 8.21 6,465.95
43,356.50
43,356.50
3,405.61
m3 49.50 23.88 1,182.06
m3 28.00 17.98 503.44
m3 25.17 11.79 296.75
m3 25.17 56.55 1,423.36
20,099.88
m3 21.88 569.96 12,470.72
m2 100.61 38.78 3,901.66
kg 1,312.50 2.84 3,727.50
16,194.48
m 34.00 137.19 4,664.46
u 2.00 3,647.15 7,294.30
pza 3.00 245.24 735.72
glb 1.00 3,500.00 3,500.00
3,656.53
m3 3.56 751.04 2,673.70
m2
9.72 38.78 376.94
kg 213.34 2.84 605.89
60,750.96
5,888.99
m3 327.53 17.98 5,888.99
54,861.97
m3 56.97 751.04 42,786.75
m2 99.00 38.78 3,839.22
kg 2,900.00 2.84 8,236.00
6,326,683.45 4.00
74,320.50
u 1.00 34,180.52 34,180.52
u 1.00 13,869.98 13,869.98
m2 18,500.00 0.42 7,770.00
m2 18,500.00 1.00 18,500.00
66,328.44 4.01
66,328.44
4.01.01
m3
374.00 8.28 3,096.72 4.01.02
0
0
m3 374.00 3.99 1,492.26 0
4.01.03
4.01.04
4.01.05
4.01.06
4.01.07
4.01.08
4.01.09
4.01.10
m3 630.00 43.91 27,663.30 4.01.11
4.01.12
m 136.00 250.56 34,076.16
5,571,021.13 4.02
489,366.95
4.02.01
m3
35,004.00 5.63 197,072.52 4.02.02
m3 10,001.00 14.02 140,214.02
m3 5,001.00 30.41 152,080.41 4.02.03
5,002,501.33
m3 131,207.50 21.94 2,878,692.55 4.02.04
4.02.07
4.02.08
79,152.85
m2 8,785.00 9.01 79,152.85 4.02.15
4.03
49,543.38
49,543.38
42,587.40
1,299.70
m3 102.00 8.28 844.56
m3 22.50 6.13 137.93
m3 79.50 3.99 317.21
8,986.68
m3 14.50 288.88 4,188.76
m2 72.00 33.11 2,383.92
kg 850.00 2.84 2,414.00
32,301.02
u 12.00 42.54 510.48
u 2.00 6,435.00 12,870.00
m2 0.80 240.13 192.10
m2 23.00 814.28 18,728.44
6,955.98
355.83
m3 29.00 8.28 240.12
m3 29.00 3.99 115.71
6,600.15
m3 11.00 288.88 3,177.68
m2 29.00 33.11 960.19
kg 867.00 2.84 2,462.28
4.03.01
4.03.02
4.03.03
4.03.04
4.03.05
4.03.06
4.03.07
4.03.08
4.03.09
4.03.10
4.03.11
4.03.12
4.03.13
565,470.00 4.04
m3
9,530.00 8.28 78,908.40 4.04.01
0
m3 551.00 6.13 3,377.63 4.04.02
m3 25.00 41.26 1,031.50
m3 6,530.00 3.99 26,054.70 0
m2 24.00 15.12 362.88 4.04.03
m3 395.35 288.88 114,208.71 4.04.04
m2 196.35 371.47 72,938.13
m2 2,465.00 33.11 81,616.15
4.04.05
4.04.06
kg 56,365.00 2.84 160,076.60 4.04.07
m 300.00 32.14 9,642.00
m 200.00 35.88 7,176.00 4.04.08
m3 150.00 43.91 6,586.50 4.04.09
m 24.00 145.45 3,490.80 4.04.10
0
4.04.11
4.05
4.05.01
4.05.02
4.05.03
4,128,559.80 5.00
5.01
5.01.01
5.01.02
5.01.03
5.01.04
5.01.05
5.01.06
5.01.07
5.01.08
5.01.09
5.01.10
5.01.11
5.01.12
5.01.13
5.01.14
5.01.15
5.01.16
4,075,724.98 5.02
m2 16,000.00 0.85 13,600.00
m 15,000.00 1.50 22,500.00
5.02.01
0
m3 3,013.97 31.40 94,639.00
m3 431.73 83.06 35,859.49
m3 27.65 136.64 3,778.10
m 15,000.00 2.98 44,700.00
m3 4,120.00 15.14 62,376.80
5.02.02
m 16,000.00 233.36 3,733,760.00
5.02.03
5.02.04
5.02.05
0
m3 1,666.66 11.56 19,266.59 0
5.02.06
glb 1.00 45,245.00 45,245.00 5.02.07
5.03
5.03.01
5.03.02
5.03.03b
5.03.03c
5.03.04
5.04
5.04.01
5.04.02
5.04.03
5.04.04
5.04.05
5.04.06
5.04.07
5.04.08
5.04.09
5.04.10
51,484.35
m2 72.00 30.29 2,180.88
m3 93.60 29.41 2,752.78
m3 14.40 50.56 728.06
m3 52.24 351.15 18,344.08
m2 416.00 26.10 10,857.60
kg 2,524.92 2.69 6,792.03
m2 52.00 36.95 1,921.40
glb 32.00 247.11 7,907.52
1,350.47
m2 5.32 30.29 161.14
m2 7.22 3.40 24.55
m2 3.99 18.95 75.61
m3 1.45 351.15 509.17
m2 10.64 26.10 277.70
kg 112.38 2.69 302.30
5.05
5.05.01
5.05.02
5.05.03
5.05.04
5.05.05
5.05.06
5.05.07
5.05.08
5.05.10
5.05.11
5.05.12
5.05.13
5.06
5.06.01
5.06.02
5.06.03
5.06.04
5.06.05
5.06.06
5.06.07
5.06.08
5.06.09
5.06.10
5.06.11
5.06.12
05.07
05.07.01
05.07.02
05.07.03
05.07.04
05.07.05
05.07.06
6.00
6.01
7.00
7.01
10,768,501.71
538,425.09
430,740.07
11,737,666.86
2,230,156.70
13,967,823.57
PRESUPUESTO CONTRACTUAL DE OBRA
TRABAJOS PRELIMINARES 0
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIAS
GLB
TRAZO Y REPLANTEO MES
LETRERO DE OBRA 7.20 X 3.60 UND
OBRAS TEMPORALES 0
MEJORAMIENTO DE CAMINOS DE ACCESO KM
MANTENIMIENTO DE CAMINOS DE ACCESO MES
OBRAS PROVISIONALES 0
DEMOLICION DE OBRAS EXISTENTES M3
PRESAS
PRESA MAYOCANCHA 0
ESTRUCTURA DE DESVIO 0
PRESA MAYOCANCHA 0
ENROCADO DE PROTECCION M3
HITO TOPOGRAFICO UND
PERFORACIONES EXPLORATORIAS - COMPROBACION M
PERFORACIONES PARA PANTALLA DE INYECCIONES M
PERFORACION PARA CONTROL M
PRUEBA DE AGUA EXPLORACION - CONTROL M
LECHADA PARA INYECCION DE IMPERMEABILIZACION TON
LECHADA PARA INYECCION DE IMPERMEABILIZACION TON
ELIMINACION DE DESMONTE d=0.20 KM M3
SUMINISTRO Y COLOCACION DE INCLINOMETRO UND
ENCOFRADO Y DESENCOFRADO PLANO VERTICAL M2
ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL M2
ACERO DE REFUERZO Fy=4200 KG/CM2 KG
PUERTA METALICA INC/VENTANA METALICA DE INSPECCION UND
ESTRUCTURA DE SERVICIO
0
ALIVIADERO DE DEMASIAS 0
EXCAVACION EN MATERIAL SUELTO M3
EXCAVACION DE ZANJA EN ROCA A MANO M3
RELLENO COMPACTADO PARA ESTRUCTURAS M3
TROCHA CARROZABLE 0
EXCAVACION EN MATERIAL SUELTO M3
RELLENO COMPACTADO PARA ESTRUCTURAS M3
CONSTRUCCION DE TROCHA DE ACCESO A CANTERAS KM
LINEA DE CONDUCCION KM 0+000 AL 14+440 0
ACUEDUCTOS COLGANTES 0
EXCAVACION DE ZANJA EN MATERIAL SUELTO A MANO M3
EXCAVACION DE ZANJA EN ROCA A MANO M3
ENCOFRADO Y DESENCOFRADO PLANO VERTICAL M2
ACERO DE REFUERZO Fy=4200 KG/CM2 KG
CONCRETO F'C=210 KG/CM2 M3
INSTALACIONES METALICAS CON PLATINAS DE ACERO A-36 KG
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 6.4MM M
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 11.5MM M
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 13.0MM M
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 16.0MM M
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 19.0MM M
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 26.0MM M
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø 29.0MM M
PROVISION E INSTALACION DE TUBERIA DE ACERO A-25 Ø16"x3/32" M
EMPALME DE TUBERIAS HDPE - ACERO UND
FLETE RURAL CON DUMPER KG
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUBTOTAL
IGV
COSTO TOTAL
OBRA VALORIZADO
Item
0 0 122,416.00 1.00
24,081.74 1.01
1.00 24,081.74
12.00 8,086.70 97,040.40 1.02
1.00 1,293.86 1,293.86 1.03
1,770,437.96 4.02.05
39501.07 44.82
176,136.25
5.00 4,504.53 22,522.65 4.02.07
240,862.18 4.03
- -
- - 1,016,714.61 4.04
7,337.44 2.64 19,370.84 4.04.01
- 36.88 - -
1,933.80 31.00 59,947.80 4.04.02
- 3.02 - -
1,233.20 30.06 37,069.99 4.04.03
991.34 398.44 394,989.51 4.04.04
- - 201,981.48 4.05
10,200.00 2.64 26,928.00 4.05.01
1,360.00 31.00 42,160.00 4.05.02
2.50 53,157.39 132,893.48 4.05.03
- - 5,097,629.82 5.00
-
- - 260,953.79 5.01
18.60 28.79 535.49 5.01.01
83.04 36.88 3,062.52 5.01.02
79.93 33.80 2,701.58 5.01.03
1,408.93 5.43 7,650.48 5.01.04
297.07 398.44 118,363.77 5.01.05
2,680.96 10.54 28,257.36 5.01.06
459.12 7.72 3,544.41 5.01.07
83.76 13.33 1,116.52 5.01.08
93.16 13.79 1,284.68 5.01.09
173.68 18.94 3,289.50 5.01.10
109.80 24.08 2,643.98 5.01.11
145.32 39.57 5,750.31 5.01.12
141.44 45.12 6,381.77 5.01.13
245.18 287.08 70,386.27 5.01.14
14.00 355.19 4,972.66 5.01.15
5,328.92 0.19 1,012.49 5.01.16
4,284,610.30
- - 2,080,741.77 5.02
- - 397,952.38 5.05
- - - 05.07
- 7.56 - 05.07.01
- 25.00 - 05.07.02
- 33.00 - 05.07.03
- 10.88 - 05.07.04
- 7.07 - 05.07.05
- 1.19 - 05.07.06
- - 297,867.35 6.00
1.00 297,867.35 297,867.35 6.01
- - 27,400.00 7.00
1.00 27,400.00 27,400.00 7.01
-
- 21,718,671.24
- 1,737,493.70
- 1,085,933.56
- 24,542,098.49
- -
- 4,417,577.73
28,959,676.22
OBRA VALORIZADO
INSTRUMENTACION 0.00
SUMINISTRO Y COLOCACION DE PIEZOMETRO UND - 4,504.53 -
ACUEDUCTOS COLGANTES - - - -
EXCAVACION DE ZANJA EN MATERIAL SUELTO A MANO M3 - 28.79 -
EXCAVACION DE ZANJA EN ROCA A MANO M3 - 36.88 -
ENCOFRADO Y DESENCOFRADO PLANO VERTICAL M2 - 33.80 -
ACERO DE REFUERZO Fy=4200 KG/CM2 KG - 5.43 -
CONCRETO F'C=210 KG/CM2 M3 - 398.44 -
INSTALACIONES METALICAS CON PLATINAS DE ACERO A-36 KG - 10.54 -
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø M - 7.72 -
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø M - 13.33 -
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø M - 13.79 -
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø M - 18.94 -
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø M - 24.08 -
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø M - 39.57 -
PROVISION E INSTALACION DE CABLES DE ACERO NEGRO Ø M - 45.12 -
PROVISION E INSTALACION DE TUBERIA DE ACERO A-25 Ø16" M - 287.08 -
EMPALME DE TUBERIAS HDPE - ACERO UND - 355.19 -
FLETE RURAL CON DUMPER KG - 0.19 -
LINEA DE CONDUCCION 2,056,335.67
REAJUSTES Y REINTEGROS
COSTO DIRECTO 6,893,504.33
GASTOS GENERALES 482,545.30
UTILIDAD 344,675.25
SUBTOTAL 7,720,724.88
-
IGV 1,389,730.48
COSTO TOTAL 9,110,455.36
2483346.09
584502.04
3067848.13
442,268.48
6,042,607.20
547,228.06
6,589,835.26 9,657,683.42
3,126,848.16
7,137,063.32 9762725.33 236.38
-105,041.91 278.9284
9329495.6
9329495.6
PRESUPUESTO DE SALDO - PRESA
22,509,804.92
PRESA MAYOCANCHA 22,509,804.92
22,215,725.37
MOVIMIENTO DE TIERRAS 870,936.08
LIMPIEZA Y DESBROCE DE TERRENO m3 42,262.60 1.71 72,269.05
EXCAVACION EN MATERIAL SUELTO m3 61,215.00 3.04 186,093.60
3
3.01
3.02
3.03
4
4.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
04.01.01
5.02
05.02.01
05.02.01
05.02.01
05.02.01
05.02.01
05.02.01
05.02.01
05.02.02
05.02.02
05.02.02
05.02.02
05.02.02
05.02.02
05.02.03
05.02.03
05.02.03
6.01
06.01.01
06.01.01
06.01.01
06.01.01
06.01.01
06.01.01
06.01.01
06.01.02
06.01.02
06.01.02
06.01.02
06.01.02
06.01.03
06.01.03
06.01.03
5
5.01
05.01.01
05.01.01
05.01.01
05.01.01
05.01.01
05.01.01
05.01.01
05.01.02
05.01.02
05.01.03
05.01.03
05.01.03
05.01.03
05.01.03
05.01.03
05.01.04
05.01.04
7
7.01
8
8.01
9
9.01
8
0.00
LINEA DE CONDUCCION 6,453,873.95
RECUPERACION DE TUBERIA INSTALADA KM 0+000 - KM 9+000 303,746.88
EXCAVACION DE ZANJA PARA RECUPERACION DE TUBERIA CON m3 10,025.07 8.45 84,711.84
EXCAVACION DE ZANJA PARA RECUPERACION DE TUBERIA MAN m3 3,116.00 35.31 110,025.96
HABILITACION DE TUBERIA HDPE 400MM -355MM SDR 32 PN - 4 m 5,876.50 18.55 109,009.08
-
LINEA DE CONDUCCIONKM 0+000 - 15 +700 4,830,083.55
MOVIMIENTO DE TIERRAS 4,830,083.55
EXCAVACIONES 4,830,083.55
EXCAVACION DE TRAMOS EN SUELO 349,063.91
EXCAVACION EN SUELO CON EQUIPO ( PLATAFORMA ) m3 1,594.90 6.66 10,622.03
EXCAVACION DE ZANJA EN SUELO CON EQUIPO m3 31,898.40 8.45 269,541.48
ELIMINACION LATERAL DE MATERIAL EXCEDENTE m3 19,139.00 3.6 68,900.40
EXCAVACION DE TRAMOS EN ROCA 1,556,802.64
EXCAVACION EN TERRENO SEMI ROCOSO CON EQUIPO ( PLATA m3 4,178.30 7.6 31,755.08
EXCAVACION DE ZANJA EN TERRENO SEMI ROCOSO CON EQUIP m3 1,752.20 12.65 22,165.33
EXCAVACION EN ROCA FIJA CON EXPLOSIVO ( PLATAFORMA) m3 16,713.20 62.48 1,044,240.74
EXCAVACION DE ZANJA EN ROCA FIJA CON EQUIPO m3 7,009.00 63.29 443,599.61
ELIMINACION LATERAL DE MATERIAL EXCEDENTE m3 4,178.30 3.6 15,041.88
RELLENOS 784,252.66
REFINE Y NIVELACION DE ZANJA m2 79,497.60 1.09 86,652.38
RELLENO COMPACTADO PARA NIVELACION DE SUB RASANTE m3 92.4 27.55 2,545.62
RELLENO COMPACTADO CON MATERIAL ZARANDEADO PARA CAMm3 2,127.30 33.59 71,456.01
RELLENO COMPACTADO CON MATERIAL SELECCIONADO ( Primer Rm3 14,685.60 24.91 365,818.30
RELLENO COMPACTADO MANUAL MATERIAL SELECCIONADO (Segu m3 7,278.60 18.7 136,109.82
CARGUIO Y TRANSPORTE DE MATERIAL DE PRESTAMO DM = 9.5 KM
m3 7,666.70 15.87 121,670.53
ENTIBADO 53,649.20
ENTIBADOS DE MADERA EN ZANJA m2 1,115.60 48.09 53,649.20
SUMINISTRO E INSTALACION DE TUBERIA 2,033,475.89
INSTALACION DE DE TUBERIA HDPE 400mm SDR -32 PN-4 m 5,123.50 223.74 1,146,331.89
INSTALACION DE DE TUBERIA HDPE 355mm SDR -32 PN-4 m 4,325.00 205.12 887,144.00
PRUEBAS HIDRAULICAS EN LA LINEA DE CONDUCCION 52,839.25
PRUEBA HIDRAULICA TUBERIA HDPE 400 mm SDR -32 PN -4 m 11,000.00 3.51 38,610.00
PRUEBA HIDRAULICA TUBERIA HDPE 355mm SDR PN -4 m 4,325.00 3.29 14,229.25
ACUEDUCTOS DE CONCRETO ARMADO (03 UNIDADES) 130,486.68
MOVIMIENTO DE TIERRAS 19,179.84
LIMPIEZA Y DESBROCE CON EQUIPO m2 258.9 1.39 359.87
VARIOS 26,682.60
CONSTRUCCION E INSTALACION DE ESCALERA DE GATO CON FIEund 12 1,257.98 15,095.76
TAPA DE INSPECCION DE CONCRETO und 12 965.57 11,586.84
3,385,594.480000
3,385,594.480000 3,386,205.410000 -610.930000
45,103,529.49440
PRESUP. DE SALDO DE OBRA PRES. DE INVERSION ACTUAL
- 1,048,949.40 - 1,160,528.62
616,726.33 629,971.29
2.00 2.55
21.00 299,505.15 33.00 396,545.55
1.00 2,263.92 2.00 3,557.78
1.00 130,454.00 1.00 130,454.00
- 543,076.60 - 590,686.15
- - 20.00 35,612.60
21.00 61,584.39 28.00 73,581.34
244.10 36,910.36 244.10 36,910.36
1.00 27,034.41 1.00 27,034.41
1.00 18,174.32 1.00 18,174.32
182.50 97,805.40 182.50 97,805.40
216.60 36,050.90 216.60 36,050.90
1.00 265,516.82 1.00 265,516.82
- - - -
- - - -
22,509,804.92 24,610,526.65
- 22,509,804.92 - 24,610,526.65
- 0.00 - 949,841.57
- - 1,749.00 3,620.43
- - 1,037.41 2,738.76
- - - -
- - - -
- - - -
- - 739.70 22,930.70
- - 645.92 19,416.36
- - 2,240.53 75,729.92
- - 493.11 25,035.19
- - 78,409.54 425,763.80
- - 235.00 11,131.95
- - 868.59 346,081.00
- - 569.28 15,677.97
- - 64.76 1,715.49
- - - -
- 22,215,725.37 - 22,404,509.88
- 870,936.08 - 1,002,354.75
42,262.60 72,269.05 78,646.12 147,582.93
61,215.00 186,093.60 81,182.61 238,808.10
- - 319.84 3,390.29
42,262.60 119,180.53 42,262.60 119,180.53
315,869.40 315,869.40
61,215.00 61,215.00
177,523.50 177,523.50
61,215.00 61,215.00
- 18,815,826.19 - 18,873,192.03
6,720,326.28 6,720,326.28
287,562.10 287,562.10
6,945,096.60 6,945,096.60
297,180.00 297,180.00
3,021,769.58 3,021,769.58
43,553.90 43,553.90
1,011.00 25,093.02 1,011.00 25,093.02
7,010.10 526,037.90 7,010.10 526,037.90
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 18,995.31 57,365.84
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
19,452.61 19,452.61
302.20 302.20
12,499.73 12,499.73
52.50 52.50
2.00 7,104.46 2.00 7,104.46
1,480,829.56 1,480,829.56
2,324.00 2,324.00
57,616.45 57,616.45
154.10 154.10
- 718,360.66 - 718,360.66
- - - -
1.00 59,638.10 1.00 59,638.10
1.00 69,577.80 1.00 69,577.80
1.00 129,215.90 1.00 129,215.90
1.00 129,215.90 1.00 129,215.90
1.00 129,215.90 1.00 129,215.90
9.00 9,954.00 9.00 9,954.00
1.00 14,676.52 1.00 14,676.52
2.00 1,200.80 2.00 1,200.80
2.00 175,665.74 2.00 175,665.74
- 1,463,745.25 - 1,463,745.25
23,483.80 73,504.29 23,483.80 73,504.29
871,248.98 871,248.98
46,967.60 46,967.60
518,991.98 518,991.98
23,483.80 23,483.80
- 346,857.19 - 346,857.19
142,046.64 142,046.64
543.74 543.74
204,810.55 204,810.55
543.74 543.74
57,664.23 222,735.02
- -
- - 841.85 1,742.63
- - 1,114.24 2,941.59
- - - -
- - 136.68 4,108.60
- - 142.23 56,670.12
- - 141.20 4,772.56
- - 12.73 646.30
- - 12,909.09 70,096.36
- - 53.89 2,552.77
- - - -
- - 142.45 21,539.86
- - - -
- - - -
1.00 57,664.23 1.00 57,664.23
- 236,415.32 - 831,458.70
- - 3,678.00 9,709.92
- - - -
- - 206.55 6,403.05
- - - -
- - 1,123.07 33,759.49
- - 605.08 241,088.08
- - 1,845.40 62,374.51
- - - -
- - 43,351.50 235,398.65
- - 133.20 6,309.68
- - - -
- - - -
- - - -
- - - -
- 59,318.51 - 59,318.51
8.80 567.78 8.80 567.78
3.00 1,068.06 3.00 1,068.06
10.00 543.60 10.00 543.60
18.70 876.28 18.70 876.28
25,796.06 25,796.06
36.70 36.70
172.70 9,619.39 172.70 9,619.39
2,937.90 18,156.22 2,937.90 18,156.22
12.00 665.04 12.00 665.04
27.00 2,026.08 27.00 2,026.08
- 177,096.81 - 177,096.81
1.00 177,096.81 1.00 177,096.81
- 0.00 - 201,981.48
- - 10,200.00 26,928.00
- - 1,360.00 42,160.00
- - 2.50 132,893.48
- 6,453,873.95 - 8,676,793.89
- 303,746.88 - 303,746.88
10,025.07 84,711.84 10,025.07 84,711.84
3,116.00 110,025.96 3,116.00 110,025.96
5,876.50 109,009.08 5,876.50 109,009.08
- 0.00 - 0.00
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 4,830,083.55 - 6,444,150.74
- 4,830,083.55 - 4,830,083.55
- 4,830,083.55 - 4,830,083.55
- 349,063.91 - 349,063.91
1,594.90 10,622.03 1,594.90 10,622.03
31,898.40 269,541.48 31,898.40 269,541.48
19,139.00 68,900.40 19,139.00 68,900.40
- 1,556,802.64 - 1,556,802.64
4,178.30 31,755.08 4,178.30 31,755.08
1,752.20 22,165.33 1,752.20 22,165.33
16,713.20 1,044,240.74 16,713.20 1,044,240.74
7,009.00 443,599.61 7,009.00 443,599.61
4,178.30 15,041.88 4,178.30 15,041.88
- 784,252.66 - 784,252.66
79,497.60 86,652.38 79,497.60 86,652.38
92.40 2,545.62 92.40 2,545.62
2,127.30 71,456.01 2,127.30 71,456.01
14,685.60 365,818.30 14,685.60 365,818.30
7,278.60 136,109.82 7,278.60 136,109.82
7,666.70 121,670.53 7,666.70 121,670.53
- 53,649.20 - 53,649.20
1,115.60 53,649.20 1,115.60 53,649.20
- 2,033,475.89 - 2,033,475.89
5,123.50 1,146,331.89 5,123.50 1,146,331.89
4,325.00 887,144.00 4,325.00 887,144.00
- 52,839.25 - 52,839.25
11,000.00 38,610.00 11,000.00 38,610.00
4,325.00 14,229.25 4,325.00 14,229.25
- 0.00 - 1,158,486.75
- - - -
- - 6,552.98 188,660.29
- - - -
- - 426.43 15,526.31
- - 4,610.00 697,078.10
- - 515.00 63,211.10
- - 5,746.67 157,975.96
- - - -
- - - -
- - 151,838.80 28,849.38
- - 9,980.01 7,185.61
- 0.00 - 455,580.44
- - 5,449.18 200,965.77
- - 153.18 4,210.91
- - 1,656.00 250,403.76
- - - -
- - - -
- 130,486.68 - 130,486.68
- 19,179.84 - 19,179.84
258.90 359.87 258.90 359.87
- - - -
- - - -
474.10 3,157.51 474.10 3,157.51
158.00 1,200.80 158.00 1,200.80
158.00 9,871.84 158.00 9,871.84
237.10 853.56 237.10 853.56
199.80 3,736.26 199.80 3,736.26
- - - -
- 110,634.06 - 110,634.06
42.20 16,787.58 42.20 16,787.58
5.50 2,095.56 5.50 2,095.56
73.70 41,837.28 73.70 41,837.28
119.00 6,628.30 119.00 6,628.30
7,004.10 43,285.34 7,004.10 43,285.34
- 672.78 - 672.78
20.00 609.20 20.00 609.20
7.20 63.58 7.20 63.58
- - - -
- - - -
- 131,148.27 - 193,798.36
- 5,853.77 - 5,853.77
132.20 880.45 132.20 880.45
44.10 335.16 44.10 335.16
44.10 2,755.37 44.10 2,755.37
66.10 237.96 66.10 237.96
94.90 328.35 94.90 328.35
70.40 1,316.48 400.78 10,828.12
- - 36.28 1,338.01
- 98,611.90 - 98,611.90
9.50 3,619.60 43.66 4,646.45
68.10 38,658.33 115.91 57,707.75
349.90 19,489.43 349.90 19,489.43
- - 268.91 9,089.15
- - - -
5,961.90 36,844.54 10,130.41 59,479.56
- - - -
- - - -
- - - -
- 26,682.60 - 26,682.60
12.00 15,095.76 12.00 15,095.76
12.00 11,586.84 12.00 11,586.84
- - - -
- - - -
- 0.00 - 12,450.97
- - 36.56 1,052.56
- - - -
- - - -
- - 26.48 795.99
- - 14.27 5,685.74
- - 33.05 1,117.09
- - - -
- - 699.74 3,799.59
- - - -
- - - -
- - - -
- - - -
- 1,058,408.57 - 1,058,408.57
- 1,058,408.57 - 1,058,408.57
- 189,946.19 - 189,946.19
3,716.10 5,165.38 3,716.10 5,165.38
3,344.50 22,274.37 3,344.50 22,274.37
1,114.80 8,472.48 1,114.80 8,472.48
1,114.80 69,652.70 1,114.80 69,652.70
1,672.30 6,020.28 1,672.30 6,020.28
1,115.30 78,360.98 1,115.30 78,360.98
- 8,042.40 - 8,042.40
60.00 8,042.40 60.00 8,042.40
- 725,267.34 - 725,267.34
552.30 219,710.46 552.30 219,710.46
409.70 232,574.40 409.70 232,574.40
34,823.10 215,206.76 34,823.10 215,206.76
943.20 52,536.24 943.20 52,536.24
666.60 5,239.48 666.60 5,239.48
- 135,152.64 - 135,152.64
72.00 135,152.64 72.00 135,152.64
- 0.00 - 533,751.69
- - 19,066.37 144,141.76
- - 4,488.20 112,205.00
- - 5,686.29 187,647.57
- - 4,901.35 53,326.70
- - 1,734.00 12,259.38
- - 20,312.00 24,171.28
- 386,000.00 - 475,360.21
1.00 386,000.00 1.30 475,360.21
- 386,000.00 - 386,000.00
1.00 386,000.00 1.00 386,000.00
- 82,998.00 - 82,998.00
1.00 82,998.00 1.00 82,998.00
- 259,965.85 - 259,965.85
1.00 73,215.00 1.00 73,215.00
1.00 186,750.85 1.00 186,750.85
463,752.59
31,670,668.72 36,706,611.96
3,385,594.48 3,705,647.82
3,167,066.88 3,395,676.45
38,223,330.08 43,807,936.23
6,880,199.41 7,885,428.52
45,103,529.49 51,693,364.75
36706611.96 14,987,940.72
3705647.82 1,968,154.12
3395676.45 2,309,742.89
43807936.23 19,265,837.74
-
7885428.5214 3,467,850.79
51693364.7514 22,733,688.53
2915509.65 -
Adicional Deductivo
metrado parcial metrado parcial
- 1,038,112.62 0 1038112.62 0 0
- -18,127.16 0 0 0 18127.16
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
- 0.00 0 0 0 0
-670.03 -1,386.96 0 0 670.03 1386.96
-1.45 -3.83 0 0 1.45 3.83
-764.40 -23,696.40 0 0 764.4 23696.4
-47.25 -1,420.34 0 0 47.25 1420.34
-48.40 -19,284.50 0 0 48.4 19284.5
- 0.00 0 0 0 0
- 0.00 0 0 0 0
-1,059.07 -5,750.75 0 0 1059.07 5750.75
4.99 236.38 4.99 236.380000000001 0 0
-1.00 -337.67 0 0 1 337.67
-7.55 -1,141.64 0 0 7.55 1141.64
-2.00 -21,712.52 0 0 2 21712.52
-1.00 -1,293.16 0 0 1 1293.16
1.00 57,664.23 1 57664.23 0 0
- -185,255.91 0 0 0 185255.91
-3,659.44 -9,660.92 0 0 3659.44 9660.92
- 0.00 0 0 0 0
-1,727.25 -53,544.75 0 0 1727.25 53544.75
- 0.00 0 0 0 0
- 0.00 0 0 0 0
-110.13 -3,310.50 0 0 110.13 3310.5
-386.26 -153,901.43 0 0 386.26 153901.43
- 0.00 0 0 0 0
- 0.00 0 0 0 0
-860.33 -29,079.16 0 0 860.33 29079.16
-49.56 -2,516.16 0 0 49.56 2516.16
-28,259.69 -153,450.11 0 0 28259.69 153450.11
- 0.00 0 0 0 0
-68.85 -3,261.43 0 0 68.85 3261.43
-469.70 -12,442.35 0 0 469.7 12442.35
-10.00 -343.40 0 0 10 343.4
- 0.00 0 0 0 0
-0.33 -161.02 0 0 0.33 161.02
- 59,318.51 0 59318.51 0 0
8.80 567.78 8.8 567.78 0 0
3.00 1,068.06 3 1068.06 0 0
10.00 543.60 10 543.6 0 0
18.70 876.28 18.7 876.28 0 0
0.13
0.15 3,705,647.820000
3,395,676.450000
43,807,936.230000 14,987,940.72
7,885,428.521400 22,733,688.52
22,733,688.53 51,693,364.751400
14,987,940.72
1,968,154.12
2,309,742.89
19,265,837.73
0.00
3,467,850.79
22,733,688.52
22,734,846.38
VALORIZACION DE O
(Periodo : Del 01 Noviembre al 30 N
PRESUPUESTO
ITEM DESCRIPCION DE PARTIDA
PRECIO
UNIDAD METRADO
UNITARIO
01 LINEA DE CONDUCCION DEL SISTEMA DE RIEGO HUARCO CURAN
01.01 TRABAJOS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.00 91,963.09
01.01.02 CARTEL DE OBRA 7.20x3.60 und 1.00 2,263.92
01.01.03 TRAZO Y REPLANTEO mes 11.00 14,262.15
01.01.04 CONSTRUCCION DE CAMPAMENTOS glb 1.00 130,454.00
01.02 OBRAS TEMPORALES
01.02.01 MANTENIMIENTO DE CAMINOS DE ACCESO mes 11.00 2,932.59
01.02.02 TRANSPORTE DE MATERIALES A PIE DE OBRA CON EQUIPO glb 1.00 265,516.82
01.03 RECUPERACION DE TUBERIA INSTALADA KM 0+000 - KM 9+000
01.03.01 EXCAVACION DE ZANJA PARA RECUPERACION DE TUBERIA CON EQUIPO m3 10,025.07 8.45
01.03.02 EXCAVACION DE ZANJA PARA RECUPERACION DE TUBERIA MANUAL m3 3,116.00 35.31
01.03.03 HABILITACION DE TUBERIA HDPE 400MM - 355MM SDR 32PN-4 m 5,876.50 18.55
01.04 LINEA DE CONDUCCION KM 0+000 - 15+700
01.04.01 MOVIMIENTO DE TIERRAS
01.04.01.01 EXCAVACIONES
01.04.01.01.01 EXCAVACIONES DE TRAMOS EN SUELO
01.04.01.01.01.01 EXCAVACION EN SUELO CON EQUIPO (PLATAFORMA) m3 1,594.90 6.66
01.04.01.01.01.02 EXCAVACION DE ZANJA EN SUELO CON EQUIPO m3 31,898.40 8.45
01.04.01.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 19,139.00 3.60
01.04.01.01.02 EXCAVACIONES DE TRAMOS EN ROCA
01.04.01.01.02.01 EXCAVACION EN TERRENO SEMI ROCOSO CON EQUIPO (PLATAFORMA) m3 4,178.30 7.60
01.04.01.01.02.02 EXCAVACION DE ZANJA EN TERRENO SEMI ROCOSO CON EQUIPO m3 1,752.20 12.65
01.04.01.01.02.03 EXCAVACION EN ROCA FIJA CON EXPLOSIVO (PLATAFORMA) m3 16,713.20 62.48
01.04.01.01.02.04 EXCAVACION DE ZANJA EN ROCA FIJA CON EQUIPO m3 7,009.00 63.29
01.04.01.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 4,178.30 3.60
01.04.01.01.03 RELLENOS
01.04.01.01.03.01 REFINE Y NIVELACION DE ZANJA m2 79,497.60 1.09
01.04.01.01.03.02 RELLENO COMPACTADO PARA NIVELACION DE SUB RASANTE m3 92.40 27.55
01.04.01.01.03.03 RELLENO COMPACTADO CON MATERIAL ZARANDEADOPARA CAMA DE ARENA m3 2,127.30 33.59
01.04.01.01.03.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO (Primer Relleno) m3 14,685.60 24.91
01.04.01.01.03.05 RELLENO COMPACTADO CON MATERIAL SELECCIONADO (Segundo Relleno) m3 7,278.60 18.70
01.04.01.01.03.06 CARGIO Y TRANSPORTE DE MATERIAL DE PRESTAMO DM=9.5 KM (inc. Extracción) m3 7,666.70 15.87
01.04.01.01.04 ENTIBADO
01.04.01.01.04.01 ENTIBADO DE MADERA EN ZANJA m2 1,115.60 48.09
01.04.01.01.05 SUMINISTRO E INSTALACION DE TUBERIA
01.04.01.01.05.01 INSTALACION DE TUBERIA HDPE 400MM SDR-32 PN-4 m 5,123.50 223.74
01.04.01.01.05.02 INSTALACION DE TUBERIA HDPE 355MM SDR-32 PN-4 m 4,325.00 205.12
01.04.01.01.06 PRUEBAS HIDRAULICAS EN LA LINEA DE CONDUCCION
01.04.01.01.06.01 PRUEBA HIDRAULICA TUBERIA HDPE 400MM SDR-32 PN4 m 11,000.00 3.51
01.04.01.01.06.02 PRUEBA HIDRAULICA TUBERIA HDPE 355MM SDR-32 PN4 m 4,325.00 3.29
01.05 OBRAS DE CRUCE DE QUEBRADA
01.05.01 CRUCE DE QUEBRADA TIPO CANOA (36 UNIDADES)
01.05.01.01 MOVIMIENTO DE TIERRAS
01.05.01.01.01 LIMPIEZA Y DESBROCE CON EQUIPO m2 3,716.10 1.39
01.05.01.01.02 EXCAVACION EN SUELO CON EQUIPO m3 3,344.50 6.66
01.05.01.01.03 EXCAVACION EN TERRENO SEMIROCOSO m3 1,114.80 7.60
01.05.01.01.04 EXCAVACION EN ROCA FIJA CON EXPLOSIVO m3 1,114.80 62.48
01.05.01.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 1,672.30 3.60
01.05.01.01.06 ENROCADO AGUAS ARRIBA Y AGUAS ABAJO m3 1,115.30 70.26
01.05.01.02 CONSTRUCCION DE SUB DRENAJE
01.05.01.02.01 CONSTRUCCION DE SUB DRENAJE (Inc. Grava, Geotextil y Tuberia PVC) m 60.00 134.04
01.05.01.03 OBRAS DE CONCRETO
01.05.01.03.01 MAMPOSTERIA DE PIEDRA F´C=210 KG/CM2 m3 552.30 397.81
01.05.01.03.02 CONCRETO F´C = 210 kg/cm2 m3 409.70 567.67
01.05.01.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 34,823.10 6.18
01.05.01.03.04 ENCOFRADO Y DESENCOFRADO m2 943.20 55.70
01.05.01.03.05 SUMINISTRO E INSTALACION DE GEOTEXTIL NO TEJIDO 200gr/m2 m2 666.60 7.86
01.05.01.04 VARIOS
01.05.01.04.01 BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 1 1/2" und 72.00 1,877.12
01.05.02 ACUEDUCTOS DE CONCRETO ARMADO (03 UNIDADES)
01.05.02.01 MOVIMIENTO DE TIERRAS
01.05.02.01.01 LIMPIEZA Y DESBROCE CON EQUIPO m2 258.90 1.39
01.05.02.01.02 EXCAVACION EN SUELO CON EQUIPO m3 474.10 6.66
01.05.02.01.03 EXCAVACION EN TERRENO SEMIROCOSO m3 158.00 7.60
01.05.02.01.04 EXCAVACION EN ROCA FIJA CON EXPLOSIVO m3 158.00 62.48
01.05.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 237.10 3.60
01.05.02.01.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 199.80 18.70
01.05.02.02 OBRAS DE CONCRETO
01.05.02.02.01 MAMPOSTERIA DE PIEDRA F´C=210 KG/CM2 m3 42.20 397.81
01.05.02.02.02 SOLADO DE CONCRETO F´C=100 KG/CM2, e=0.10m m3 5.50 381.01
01.05.02.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 7,004.10 6.18
01.05.02.02.04 ENCOFRADO Y DESENCOFRADO m2 119.00 55.70
01.05.02.02.05 CONCRETO F´C = 210 kg/cm2 m3 73.70 567.67
01.05.02.03 VARIOS
01.05.02.03.01 ANCLAJE DE TUBERIA EN VIGA DE CONCRETO und 20.00 30.46
01.05.02.03.02 JUNTA DE DILATACION m 7.20 8.83
01.06 OBRAS DE ALIVIO
01.06.01 CAMARA ROMPE PRESION (12 UNIDADES)
01.06.01.01 MOVIMIENTO DE TIERRAS
01.06.01.01.01 EXCAVACION EN SUELO CON EQUIPO m3 132.20 6.66
01.06.01.01.02 EXCAVACION EN TERRENO SEMIROCOSO m3 44.10 7.60
01.06.01.01.03 EXCAVACION EN ROCA FIJA CON EXPLOSIVO m3 44.10 62.48
01.06.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE m3 66.10 3.60
01.06.01.01.05 NIVELACION Y COMPACTACION DE TERRENO m2 94.90 3.46
01.06.01.01.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 70.40 18.70
01.06.01.02 OBRAS DE CONCRETO
01.06.01.02.01 SOLADO DE CONCRETO F´C=100 KG/CM2, e=0.10m m3 9.50 381.01
01.06.01.02.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 5,961.90 6.18
01.06.01.02.03 ENCOFRADO Y DESENCOFRADO m2 349.90 55.70
01.06.01.02.04 CONCRETO F´C = 210 kg/cm2 m3 68.10 567.67
01.06.01.03 VARIOS
01.06.01.03.01 CONSTRUCCION E INSTALACION DE ESCALERA DE GATO CON FIERRO DE 1/2" und 12.00 1,257.98
02.05.02.02 DREN PRINCIPAL CON TUBERIA HDPE D=6" NO PERFORADA m 543.74 376.67
02.05.03 PRESA
02.05.03.01 RELLENO COMPACTADO PARA TERRAPLEN (MATERIAL TIPO 1) m3 287,562.10 23.37
02.05.03.02 RELLENO COMPACTADO PARA TERRAPLEN (MATERIAL TIPO 2) m3 297,180.00 23.37
02.05.03.03 RELLENO COMPACTADO MATERIAL DE FILTRO (MATERIAL TIPO 3) m3 43,553.90 69.38
02.05.03.04 CARPETA DE RODADURA (MATERIAL TIPO 2) m3 1,011.00 24.82
02.05.03.05 SUMINISTRO E INSTALACION DE TUBERIA PERFORADA HDPE D=6" m 302.20 64.37
02.05.03.06 SUMINISTRO E INSTALACION DE TUBERIA NO PERFORADA HDPE D=6" m 52.50 238.09
02.05.03.07 CAJA DE CONCRETO und 2.00 3,552.23
02.05.03.08 ENROCADO DE PROTECCION m3 7,010.10 75.04
02.05.03.09 SUMINISTRO E INSTALACION DE COLCHON H=0.3; A=2; L=5m und 2,324.00 637.19
02.05.03.10 CANAL EN MAMPOSTERIA DE PIEDRA ASENTADA EN CONCRETO F´C=210 k/cm2 m3 154.10 373.89
02.05.04 IMPERMEABILIZACION
02.05.04.01 PERFILADO MANUAL EN BASE Y EN TALUD m2 23,483.80 3.13
02.05.04.02 SUMINISTRO E INSTALACION DE GEOTEXTIL NO TEJIDO 400 gr/cm2 m2 46,967.60 18.55
02.05.04.03 SUMINISTRO E INSTALACION DE GEOMEMBRANA e=1.5mm m2 23,483.80 22.10
02.05.05 INSTRUMENTACION
02.05.05.01 PIEZOMETRO Pz1 H=30m glb 1.00 59,638.10
02.05.05.02 PIEZOMETRO Pz2 H=35m glb 1.00 69,577.80
02.05.05.03 PIEZOMETRO Pz3 H=65m glb 1.00 129,215.90
02.05.05.04 PIEZOMETRO Pz4 H=65m glb 1.00 129,215.90
02.05.05.05 PIEZOMETRO Pz5 H=65m glb 1.00 129,215.90
02.05.05.06 PUNTOS DE CONTROL TOPOGRAFICOS glb 9.00 1,106.00
02.05.05.07 INCLINOMETRO H=40m und 1.00 14,676.52
02.05.05.08 HITOS DE CONTROL TOPOGRAFICO und 2.00 600.40
COSTO DIRECTO
GASTOS GENERALES Y UTILIDAD (20.6899745942592%) % 20.6899745942592
FACTOR DE RELACION 1.0000
SUBTOTAL
CUADROS RESUMENES
PRESUPUESTO
RESUMEN 1 (sin IGV)
PRECIO
ITEM DESCRIPCION DE PARTIDA UNIDAD METRADO
UNITARIO
001 LINEA DE CONDUCCION
002 PRESA HUARCO CURAN
003 MITIGACION AMBIENTAL
004 CAPACITACION
005 PLAN DE MONITOREO ARQUEOLOGICO
006 FLETE
TOTALES
LORIZACION DE OBRA Nº 05
eriodo : Del 01 Noviembre al 30 Noviembre 2016)
A Y COMPLEMENTACION - SISTEMA DE RIEGO CUSHUROCOCHA - HUARCO CURÁN, CAJACAY, ANCASH - PIP 42846
A N° 002-2013-AG-PSI
AVANCES
ESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
Monto
50,579.70
0.00
99,835.05
13,045.40
17,240.07
39,538.70 13,141.07 10512.856
0.00 2628.214
10,622.03
207,568.63
53,058.82
26,854.26
17,621.10
486,294.24
416,521.14
8,147.99
74,494.75
2,545.62
65,006.73
360,684.20
136,109.82
121,670.53
53,649.20
1,146,331.89
755,867.20
38,610.00
14,229.25
5,165.38
22,274.37
8,472.48
69,652.70
6,020.28
78,360.98
8,042.40
219,710.46
232,574.40
215,206.76
52,536.24
5,239.48
135,152.64
359.87
3,157.51
1,200.80
9,871.84
853.56
3,736.26
16,787.58
2,095.56
43,285.34
6,628.30
41,837.28
609.20
63.58
0.00
0.00
0.00
492.57
335.16
2,755.37
175.06
246.24
1,316.48
3,318.41
33,092.82
16,232.93
38,658.33
15,095.76
11,586.84
262,381.62
82,130.20
20,528.13
36,910.36
27,034.41
18,174.32
97,805.40
36,050.90
0.00
760.46
73.93
481.48
0.00
0.00
0.00
0.00
1,013.04
177,096.81
57,664.23
0.00 25,357.56
0.00 18,364.50
-0.01 16,905.04
0.00 18,364.50
0.00 18,364.50
142,046.64
204,810.55
0.00
6,720,326.28
6,945,096.60
3,021,769.58
25,093.02
19,452.61
12,499.73
7,104.46
526,037.90
1,480,829.56
57,616.45
73,504.29
871,248.98
518,991.98
59,638.10
69,577.80
129,215.90
129,215.90
129,215.90
9,954.00
14,676.52 oct a dic.
1,200.80 5501238.12 total a fin de año
175,665.74
333,311.00
386,000.00
53,118.72
55,643.40
146,338.93
28,909,196.42
5,981,305.39
34,890,501.81
SALDO
Monto
5,771,889.80
22,162,894.57
333,311.00
386,000.00
53,118.72
201,982.33
28,909,196.42
91.28%
3.1 CEDULA DE CULTIVO TOT
1 PAPA 43.1
ALCACHOFA
ALFALFA 62.6
2 AJO
3 TRIGO 23.7
4 CEBADA 16.0
MACA
5 AVENA FORRAJERA
6 TARWI
7 ARVEJA GS
8 HABA 9.4
FRIJOL
QUINUA
PALTO
MAIZ 17.8
OLLUCO 3.7
OCA 3.7
Total Campaña Principal 180.0 0.0
DE CULTIVO TOTAL
948.0
COSTO DE
PRECIO DE COSTO DE
PRODUCCION
RENDIMIENTO VENTA EN PRODUCCION A
A PRECIOS
CULTIVOS CHACRA PRECIOS SOCIALES
PRIVADOS
x Ha
KG/HA x Ha s/.x kg
PROGRAMACIÓN ANUAL
CONCEPTOS VALOR ACTUAL
PAPA 60.90 121.80 182.70 203.00 203.00 203.00 203.00 203.00 203.00 203.00
ALCACHOFA 26.10 52.20 78.30 87.00 87.00 87.00 87.00 87.00 87.00 87.00
ALFALFA 28.50 57.00 85.50 95.00 95.00 95.00 95.00 95.00 95.00 95.00
AJO 34.50 69.00 103.50 115.00 115.00 115.00 115.00 115.00 115.00 115.00
TRIGO 18.00 36.00 54.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00
CEBADA 15.30 30.60 45.90 51.00 51.00 51.00 51.00 51.00 51.00 51.00
MACA 6.00 12.00 18.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
AVENA FORRAJERA 3.00 6.00 9.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
TARWI 4.80 9.60 14.40 16.00 16.00 16.00 16.00 16.00 16.00 16.00
ARVEJA GS 12.90 25.80 38.70 43.00 43.00 43.00 43.00 43.00 43.00 43.00
HABA 23.10 46.20 69.30 77.00 77.00 77.00 77.00 77.00 77.00 77.00
FRIJOL 13.50 27.00 40.50 45.00 45.00 45.00 45.00 45.00 45.00 45.00
QUINUA 30.90 61.80 92.70 103.00 103.00 103.00 103.00 103.00 103.00 103.00
PALTO 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00
TOTAL AREA 300.50 578.00 855.50 948.00 948.00 948.00 948.00 948.00 948.00 948.00
CULTIVOS COSTOS DE PRODUCCION POR HECTAREA A PRECIOS PRIVADOS
PAPA 7,566.38 7,566.38 7,566.38 7,566.38 7,566.38 7,566.38 7,566.38 7,566.38 7,566.38 7,566.38 69,070.05
ALCACHOFA 16,153.55 16,153.55 16,153.55 16,153.55 16,153.55 16,153.55 16,153.55 16,153.55 16,153.55 16,153.55 147,458.42
ALFALFA 4,855.78 4,855.78 4,855.78 4,855.78 4,855.78 4,855.78 4,855.78 4,855.78 4,855.78 4,855.78 44,326.21
AJO 6,551.82 6,551.82 6,551.82 6,551.82 6,551.82 6,551.82 6,551.82 6,551.82 6,551.82 6,551.82 59,808.59
TRIGO 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 27,358.25
CEBADA 1,497.34 1,497.34 1,497.34 1,497.34 1,497.34 1,497.34 1,497.34 1,497.34 1,497.34 1,497.34 13,668.54
MACA 4,159.91 4,159.91 4,159.91 4,159.91 4,159.91 4,159.91 4,159.91 4,159.91 4,159.91 4,159.91 37,973.93
AVENA FORRAJERA 1,160.25 1,160.25 1,160.25 1,160.25 1,160.25 1,160.25 1,160.25 1,160.25 1,160.25 1,160.25 10,591.40
TARWI 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 2,997.00 27,358.25
ARVEJA GS 3,936.70 3,936.70 3,936.70 3,936.70 3,936.70 3,936.70 3,936.70 3,936.70 3,936.70 3,936.70 35,936.35
HABA 3,456.77 3,456.77 3,456.77 3,456.77 3,456.77 3,456.77 3,456.77 3,456.77 3,456.77 3,456.77 31,555.28
FRIJOL 4,722.47 4,722.47 4,722.47 4,722.47 4,722.47 4,722.47 4,722.47 4,722.47 4,722.47 4,722.47 43,109.28
QUINUA 2,273.00 2,273.00 2,273.00 2,273.00 2,273.00 2,273.00 2,273.00 2,273.00 2,273.00 2,273.00 20,749.18
PALTO 7,754.54 7,754.54 7,754.54 7,754.54 7,754.54 7,754.54 7,754.54 7,754.54 7,754.54 7,754.54 70,787.67
CULTIVOS RENDIMIENTOS POR HECTAREA (Kg/ha)
PAPA 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00
ALCACHOFA 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00
ALFALFA 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00
AJO 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00
TRIGO 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00
CEBADA 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00
MACA 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00
AVENA FORRAJERA 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00
TARWI 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00
ARVEJA GS 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00
HABA 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00
FRIJOL 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00
QUINUA 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00
PALTO 0.00 0.00 5,000.00 10,000.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00
PRECIO DE VENTA AL MERCADO
CULTIVOS
PAPA 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800
ALCACHOFA 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500
ALFALFA 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
AJO 3.150 3.150 3.150 3.150 3.150 3.150 3.150 3.150 3.150 3.150
TRIGO 2.200 2.200 2.200 2.200 2.200 2.200 2.200 2.200 2.200 2.200
CEBADA 1.290 1.290 1.290 1.290 1.290 1.290 1.290 1.290 1.290 1.290
MACA 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
AVENA FORRAJERA 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
TARWI 3.920 3.920 3.920 3.920 3.920 3.920 3.920 3.920 3.920 3.920
ARVEJA GS 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170
HABA 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850
FRIJOL 3.980 3.980 3.980 3.980 3.980 3.980 3.980 3.980 3.980 3.980
QUINUA 5.420 5.420 5.420 5.420 5.420 5.420 5.420 5.420 5.420 5.420
PALTO 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370
BENEFICIOS CON PROYECTO (A PRECIOS DE MERCADO)
PROGRAMACIÓN ANUAL
CONCEPTOS VALOR ACTUAL
PAPA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
ALCACHOFA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
ALFALFA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
AJO 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
TRIGO 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
CEBADA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
MACA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
AVENA FORRAJERA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
TARWI 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
ARVEJA GS 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
HABA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
FRIJOL 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
QUINUA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
PALTO 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
CULTIVOS VALOR BRUTO DE LA PRODUCCION AGROPECUARIA
PAPA 493,046.40 986,092.80 1,479,139.20 1,643,488.00 1,643,488.00 1,643,488.00 1,643,488.00 1,643,488.00 1,643,488.00 1,643,488.00 13,266,980.44
ALCACHOFA 540,270.00 1,080,540.00 1,620,810.00 1,800,900.00 1,800,900.00 1,800,900.00 1,800,900.00 1,800,900.00 1,800,900.00 1,800,900.00 14,537,681.49
ALFALFA 237,081.24 474,162.48 711,243.72 790,270.80 790,270.80 790,270.80 790,270.80 790,270.80 790,270.80 790,270.80 6,379,424.28
AJO 799,848.00 1,599,696.00 2,399,544.00 2,666,160.00 2,666,160.00 2,666,160.00 2,666,160.00 2,666,160.00 2,666,160.00 2,666,160.00 21,522,452.59
TRIGO 73,228.32 146,456.64 219,684.96 244,094.40 244,094.40 244,094.40 244,094.40 244,094.40 244,094.40 244,094.40 1,970,440.69
CEBADA 36,552.13 73,104.27 109,656.40 121,840.45 121,840.45 121,840.45 121,840.45 121,840.45 121,840.45 121,840.45 983,551.35
MACA 132,480.00 264,960.00 397,440.00 441,600.00 441,600.00 441,600.00 441,600.00 441,600.00 441,600.00 441,600.00 3,564,795.46
AVENA FORRAJERA 14,076.00 28,152.00 42,228.00 46,920.00 46,920.00 46,920.00 46,920.00 46,920.00 46,920.00 46,920.00 378,759.52
TARWI 51,932.16 103,864.32 155,796.48 173,107.20 173,107.20 173,107.20 173,107.20 173,107.20 173,107.20 173,107.20 1,397,399.82
ARVEJA GS 103,014.24 206,028.48 309,042.72 343,380.80 343,380.80 343,380.80 343,380.80 343,380.80 343,380.80 343,380.80 2,771,925.54
HABA 144,513.60 289,027.20 433,540.80 481,712.00 481,712.00 481,712.00 481,712.00 481,712.00 481,712.00 481,712.00 3,888,597.72
FRIJOL 173,010.60 346,021.20 519,031.80 576,702.00 576,702.00 576,702.00 576,702.00 576,702.00 576,702.00 576,702.00 4,655,400.07
QUINUA 308,159.52 616,319.04 924,478.56 1,027,198.40 1,027,198.40 1,027,198.40 1,027,198.40 1,027,198.40 1,027,198.40 1,027,198.40 8,292,011.31
PALTO 0.00 0.00 250,746.00 501,492.00 802,387.20 802,387.20 802,387.20 802,387.20 802,387.20 802,387.20 5,274,009.93
CULTIVOS COSTO TOTAL DE PRODUCCION
PAPA 460,792.54 921,585.08 1,382,377.63 1,535,975.14 1,535,975.14 1,535,975.14 1,535,975.14 1,535,975.14 1,535,975.14 1,535,975.14 12,399,087.88
ALCACHOFA 421,607.66 843,215.31 1,264,822.97 1,405,358.85 1,405,358.85 1,405,358.85 1,405,358.85 1,405,358.85 1,405,358.85 1,405,358.85 11,344,693.95
ALFALFA 138,389.73 276,779.46 415,169.19 461,299.10 461,299.10 461,299.10 461,299.10 461,299.10 461,299.10 461,299.10 3,723,815.53
AJO 226,037.79 452,075.58 678,113.37 753,459.30 753,459.30 753,459.30 753,459.30 753,459.30 753,459.30 753,459.30 6,082,265.16
TRIGO 53,946.00 107,892.00 161,838.00 179,820.00 179,820.00 179,820.00 179,820.00 179,820.00 179,820.00 179,820.00 1,451,588.59
CEBADA 22,909.30 45,818.60 68,727.91 76,364.34 76,364.34 76,364.34 76,364.34 76,364.34 76,364.34 76,364.34 616,447.58
MACA 24,959.46 49,918.92 74,878.38 83,198.20 83,198.20 83,198.20 83,198.20 83,198.20 83,198.20 83,198.20 671,613.60
AVENA FORRAJERA 3,480.75 6,961.50 10,442.25 11,602.50 11,602.50 11,602.50 11,602.50 11,602.50 11,602.50 11,602.50 93,660.64
TARWI 14,385.60 28,771.20 43,156.80 47,952.00 47,952.00 47,952.00 47,952.00 47,952.00 47,952.00 47,952.00 387,090.29
ARVEJA GS 50,783.43 101,566.86 152,350.29 169,278.10 169,278.10 169,278.10 169,278.10 169,278.10 169,278.10 169,278.10 1,366,489.59
HABA 79,851.39 159,702.77 239,554.16 266,171.29 266,171.29 266,171.29 266,171.29 266,171.29 266,171.29 266,171.29 2,148,655.36
FRIJOL 63,753.35 127,506.69 191,260.04 212,511.15 212,511.15 212,511.15 212,511.15 212,511.15 212,511.15 212,511.15 1,715,486.37
QUINUA 70,235.70 140,471.40 210,707.10 234,119.00 234,119.00 234,119.00 234,119.00 234,119.00 234,119.00 234,119.00 1,889,914.74
PALTO 178,354.42 178,354.42 178,354.42 178,354.42 178,354.42 178,354.42 178,354.42 178,354.42 178,354.42 178,354.42 1,628,116.47
CULTIVOS VALOR NETO DE LA PRODUCCION AGRICOLA
PAPA 32,253.86 64,507.72 96,761.57 107,512.86 107,512.86 107,512.86 107,512.86 107,512.86 107,512.86 107,512.86 753,084.18
ALCACHOFA 118,662.35 237,324.69 355,987.04 395,541.15 395,541.15 395,541.15 395,541.15 395,541.15 395,541.15 395,541.15 2,770,606.06
ALFALFA 98,691.51 197,383.02 296,074.53 328,971.70 328,971.70 328,971.70 328,971.70 328,971.70 328,971.70 328,971.70 2,304,313.94
AJO 573,810.21 1,147,620.42 1,721,430.63 1,912,700.70 1,912,700.70 1,912,700.70 1,912,700.70 1,912,700.70 1,912,700.70 1,912,700.70 13,397,696.15
TRIGO 19,282.32 38,564.64 57,846.96 64,274.40 64,274.40 64,274.40 64,274.40 64,274.40 64,274.40 64,274.40 450,216.22
CEBADA 13,642.83 27,285.67 40,928.50 45,476.11 45,476.11 45,476.11 45,476.11 45,476.11 45,476.11 45,476.11 318,541.78
MACA 107,520.54 215,041.08 322,561.62 358,401.80 358,401.80 358,401.80 358,401.80 358,401.80 358,401.80 358,401.80 2,510,459.90
AVENA FORRAJERA 10,595.25 21,190.50 31,785.75 35,317.50 35,317.50 35,317.50 35,317.50 35,317.50 35,317.50 35,317.50 247,384.83
TARWI 37,546.56 75,093.12 112,639.68 125,155.20 125,155.20 125,155.20 125,155.20 125,155.20 125,155.20 125,155.20 876,661.64
ARVEJA GS 52,230.81 104,461.62 156,692.43 174,102.70 174,102.70 174,102.70 174,102.70 174,102.70 174,102.70 174,102.70 1,219,519.12
HABA 64,662.21 129,324.43 193,986.64 215,540.71 215,540.71 215,540.71 215,540.71 215,540.71 215,540.71 215,540.71 1,509,775.65
FRIJOL 109,257.26 218,514.51 327,771.77 364,190.85 364,190.85 364,190.85 364,190.85 364,190.85 364,190.85 364,190.85 2,551,009.86
QUINUA 237,923.82 475,847.64 713,771.46 793,079.40 793,079.40 793,079.40 793,079.40 793,079.40 793,079.40 793,079.40 5,555,200.99
PALTO (178,354.42) (178,354.42) 72,391.58 323,137.58 624,032.78 624,032.78 624,032.78 624,032.78 624,032.78 624,032.78 2,979,515.54
TOTAL 1,297,725.10 2,773,804.63 4,500,630.15 5,243,402.66 5,544,297.86 5,544,297.86 5,544,297.86 5,544,297.86 5,544,297.86 5,544,297.86 43,364,504.46
Factor de Actualización 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.15 0.14
BENEFICIOS CON PROYECTO (A PRECIOS DE MERCADO)
PROGRAMACIÓN ANUAL
CONCEPTOS VALOR ACTUAL
VAN DE LA PRODUCCION 919,341.18 1,802,782.69 2,683,578.71 2,868,320.81 2,782,496.14 2,552,748.75 2,341,971.33 2,148,597.55 832,652.13 763,901.04 33,485,353.97
BENEFICIOS CON PROYECTO (A PRECIOS SOCIALES)
PROGRAMACIÓN ANUAL
VALOR
NOMBRE
ACTUAL
AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 …. AÑO 22 AÑO 23
NUMERO DE HECTAREAS
PAPA 60.90 121.80 182.70 203.00 203.00 203.00 203.00 203.00 203.00 203.00
ALCACHOFA 26.10 52.20 78.30 87.00 87.00 87.00 87.00 87.00 87.00 87.00
ALFALFA 28.50 57.00 85.50 95.00 95.00 95.00 95.00 95.00 95.00 95.00
AJO 34.50 69.00 103.50 115.00 115.00 115.00 115.00 115.00 115.00 115.00
TRIGO 18.00 36.00 54.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00
CEBADA 15.30 30.60 45.90 51.00 51.00 51.00 51.00 51.00 51.00 51.00
MACA 6.00 12.00 18.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
AVENA FORRAJERA 3.00 6.00 9.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
TARWI 4.80 9.60 14.40 16.00 16.00 16.00 16.00 16.00 16.00 16.00
ARVEJA GS 12.90 25.80 38.70 43.00 43.00 43.00 43.00 43.00 43.00 43.00
HABA 23.10 46.20 69.30 77.00 77.00 77.00 77.00 77.00 77.00 77.00
FRIJOL 13.50 27.00 40.50 45.00 45.00 45.00 45.00 45.00 45.00 45.00
QUINUA 30.90 61.80 92.70 103.00 103.00 103.00 103.00 103.00 103.00 103.00
PALTO 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00
TOTAL AREA 300.50 578.00 855.50 948.00 948.00 948.00 948.00 948.00 948.00 948.00
CULTIVOS COSTOS DE PRODUCCION POR HECTAREA A PRECIOS SOCIALES
PAPA 5,088.20 5,088.20 5,088.20 5,088.20 5,088.20 5,088.20 5,088.20 5,088.20 5,088.20 5,088.20 46,447.85
ALCACHOFA 10,862.85 10,862.85 10,862.85 10,862.85 10,862.85 10,862.85 10,862.85 10,862.85 10,862.85 10,862.85 99,162.04
ALFALFA 3,265.39 3,265.39 3,265.39 3,265.39 3,265.39 3,265.39 3,265.39 3,265.39 3,265.39 3,265.39 29,808.25
AJO 4,405.93 4,405.93 4,405.93 4,405.93 4,405.93 4,405.93 4,405.93 4,405.93 4,405.93 4,405.93 40,219.75
TRIGO 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 18,397.73
CEBADA 1,006.92 1,006.92 1,006.92 1,006.92 1,006.92 1,006.92 1,006.92 1,006.92 1,006.92 1,006.92 9,191.74
MACA 2,797.43 2,797.43 2,797.43 2,797.43 2,797.43 2,797.43 2,797.43 2,797.43 2,797.43 2,797.43 25,536.50
AVENA FORRAJERA 780.24 780.24 780.24 780.24 780.24 780.24 780.24 780.24 780.24 780.24 7,122.44
TARWI 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 2,015.41 18,397.73
ARVEJA GS 2,647.33 2,647.33 2,647.33 2,647.33 2,647.33 2,647.33 2,647.33 2,647.33 2,647.33 2,647.33 24,166.28
HABA 2,324.59 2,324.59 2,324.59 2,324.59 2,324.59 2,324.59 2,324.59 2,324.59 2,324.59 2,324.59 21,220.13
FRIJOL 3,175.74 3,175.74 3,175.74 3,175.74 3,175.74 3,175.74 3,175.74 3,175.74 3,175.74 3,175.74 28,989.90
QUINUA 1,447.07 1,447.07 1,447.07 1,447.07 1,447.07 1,447.07 1,447.07 1,447.07 1,447.07 1,447.07 13,209.64
PALTO 5,214.73 5,214.73 5,214.73 5,214.73 5,214.73 5,214.73 5,214.73 5,214.73 5,214.73 5,214.73 47,602.91
CULTIVOS RENDIMIENTOS POR HECTAREA (Kg/ha)
PAPA 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00
ALCACHOFA 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00
ALFALFA 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00 30,140.00
AJO 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00
TRIGO 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00 2,010.00
CEBADA 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00 2,013.00
MACA 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00
AVENA FORRAJERA 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00 17,000.00
TARWI 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00
ARVEJA GS 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00
HABA 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00
FRIJOL 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00
QUINUA 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00
PALTO 0.00 0.00 5,000.00 10,000.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00
PRECIO DE VENTA AL MERCADO
CULTIVOS
PAPA 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800
ALCACHOFA 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500
ALFALFA 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
AJO 3.150 3.150 3.150 3.150 3.150 3.150 3.150 3.150 3.150 3.150
TRIGO 2.200 2.200 2.200 2.200 2.200 2.200 2.200 2.200 2.200 2.200
CEBADA 1.290 1.290 1.290 1.290 1.290 1.290 1.290 1.290 1.290 1.290
MACA 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
AVENA FORRAJERA 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
TARWI 3.920 3.920 3.920 3.920 3.920 3.920 3.920 3.920 3.920 3.920
ARVEJA GS 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170
HABA 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850
FRIJOL 3.980 3.980 3.980 3.980 3.980 3.980 3.980 3.980 3.980 3.980
QUINUA 5.420 5.420 5.420 5.420 5.420 5.420 5.420 5.420 5.420 5.420
PALTO 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370 2.370
BENEFICIOS CON PROYECTO (A PRECIOS SOCIALES)
PROGRAMACIÓN ANUAL
VALOR
NOMBRE
ACTUAL
AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 …. AÑO 22 AÑO 23
CULTIVOS PORCENTAJE DESTINADO AL MERCADO
PAPA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
ALCACHOFA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
ALFALFA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
AJO 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
TRIGO 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
CEBADA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
MACA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
AVENA FORRAJERA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
TARWI 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
ARVEJA GS 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
HABA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
FRIJOL 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
QUINUA 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
PALTO 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
CULTIVOS VALOR BRUTO DE LA PRODUCCION AGROPECUARIA
PAPA 493,046.40 986,092.80 1,479,139.20 1,643,488.00 1,643,488.00 1,643,488.00 1,643,488.00 1,643,488.00 1,643,488.00 1,643,488.00 13,266,980.44
ALCACHOFA 540,270.00 1,080,540.00 1,620,810.00 1,800,900.00 1,800,900.00 1,800,900.00 1,800,900.00 1,800,900.00 1,800,900.00 1,800,900.00 14,537,681.49
ALFALFA 237,081.24 474,162.48 711,243.72 790,270.80 790,270.80 790,270.80 790,270.80 790,270.80 790,270.80 790,270.80 6,379,424.28
AJO 799,848.00 1,599,696.00 2,399,544.00 2,666,160.00 2,666,160.00 2,666,160.00 2,666,160.00 2,666,160.00 2,666,160.00 2,666,160.00 21,522,452.59
TRIGO 73,228.32 146,456.64 219,684.96 244,094.40 244,094.40 244,094.40 244,094.40 244,094.40 244,094.40 244,094.40 1,970,440.69
CEBADA 36,552.13 73,104.27 109,656.40 121,840.45 121,840.45 121,840.45 121,840.45 121,840.45 121,840.45 121,840.45 983,551.35
MACA 132,480.00 264,960.00 397,440.00 441,600.00 441,600.00 441,600.00 441,600.00 441,600.00 441,600.00 441,600.00 3,564,795.46
AVENA FORRAJERA 14,076.00 28,152.00 42,228.00 46,920.00 46,920.00 46,920.00 46,920.00 46,920.00 46,920.00 46,920.00 378,759.52
TARWI 51,932.16 103,864.32 155,796.48 173,107.20 173,107.20 173,107.20 173,107.20 173,107.20 173,107.20 173,107.20 1,397,399.82
ARVEJA GS 103,014.24 206,028.48 309,042.72 343,380.80 343,380.80 343,380.80 343,380.80 343,380.80 343,380.80 343,380.80 2,771,925.54
HABA 144,513.60 289,027.20 433,540.80 481,712.00 481,712.00 481,712.00 481,712.00 481,712.00 481,712.00 481,712.00 3,888,597.72
FRIJOL 173,010.60 346,021.20 519,031.80 576,702.00 576,702.00 576,702.00 576,702.00 576,702.00 576,702.00 576,702.00 4,655,400.07
QUINUA 308,159.52 616,319.04 924,478.56 1,027,198.40 1,027,198.40 1,027,198.40 1,027,198.40 1,027,198.40 1,027,198.40 1,027,198.40 8,292,011.31
PALTO 0.00 0.00 250,746.00 501,492.00 802,387.20 802,387.20 802,387.20 802,387.20 802,387.20 802,387.20 5,274,009.93
CULTIVOS COSTO TOTAL
PAPA 309,871.27 619,742.54 929,613.81 1,032,904.23 1,032,904.23 1,032,904.23 1,032,904.23 1,032,904.23 1,032,904.23 1,032,904.23 8,338,071.37
ALCACHOFA 283,520.43 567,040.86 850,561.29 945,068.10 945,068.10 945,068.10 945,068.10 945,068.10 945,068.10 945,068.10 7,629,018.26
ALFALFA 93,063.58 186,127.15 279,190.73 310,211.92 310,211.92 310,211.92 310,211.92 310,211.92 310,211.92 310,211.92 2,504,171.27
AJO 152,004.67 304,009.33 456,014.00 506,682.22 506,682.22 506,682.22 506,682.22 506,682.22 506,682.22 506,682.22 4,090,168.68
TRIGO 36,277.31 72,554.63 108,831.94 120,924.38 120,924.38 120,924.38 120,924.38 120,924.38 120,924.38 120,924.38 976,156.42
CEBADA 15,405.92 30,811.85 46,217.77 51,353.08 51,353.08 51,353.08 51,353.08 51,353.08 51,353.08 51,353.08 414,545.33
MACA 16,784.60 33,569.20 50,353.81 55,948.67 55,948.67 55,948.67 55,948.67 55,948.67 55,948.67 55,948.67 451,643.07
AVENA FORRAJERA 2,340.72 4,681.43 7,022.15 7,802.39 7,802.39 7,802.39 7,802.39 7,802.39 7,802.39 7,802.39 62,984.40
TARWI 9,673.95 19,347.90 29,021.85 32,246.50 32,246.50 32,246.50 32,246.50 32,246.50 32,246.50 32,246.50 260,308.38
ARVEJA GS 34,150.57 68,301.13 102,451.70 113,835.22 113,835.22 113,835.22 113,835.22 113,835.22 113,835.22 113,835.22 918,929.51
HABA 53,698.03 107,396.06 161,094.08 178,993.43 178,993.43 178,993.43 178,993.43 178,993.43 178,993.43 178,993.43 1,444,916.10
FRIJOL 42,872.50 85,745.01 128,617.51 142,908.35 142,908.35 142,908.35 142,908.35 142,908.35 142,908.35 142,908.35 1,153,620.97
QUINUA 44,714.46 89,428.93 134,143.39 149,048.21 149,048.21 149,048.21 149,048.21 149,048.21 149,048.21 149,048.21 1,203,184.74
PALTO 119,938.81 119,938.81 119,938.81 119,938.81 119,938.81 119,938.81 119,938.81 119,938.81 119,938.81 119,938.81 1,094,866.93
CULTIVOS VALOR NETO DE LA PRODUCCION AGRICOLA
PAPA 183,175.13 366,350.26 549,525.39 610,583.77 610,583.77 610,583.77 610,583.77 610,583.77 610,583.77 610,583.77 4,928,909.07
ALCACHOFA 256,749.57 513,499.14 770,248.71 855,831.90 855,831.90 855,831.90 855,831.90 855,831.90 855,831.90 855,831.90 6,908,663.23
ALFALFA 144,017.66 288,035.33 432,052.99 480,058.88 480,058.88 480,058.88 480,058.88 480,058.88 480,058.88 480,058.88 3,875,253.01
AJO 647,843.33 1,295,686.67 1,943,530.00 2,159,477.78 2,159,477.78 2,159,477.78 2,159,477.78 2,159,477.78 2,159,477.78 2,159,477.78 17,432,283.91
TRIGO 36,951.01 73,902.01 110,853.02 123,170.02 123,170.02 123,170.02 123,170.02 123,170.02 123,170.02 123,170.02 994,284.27
CEBADA 21,146.21 42,292.42 63,438.63 70,487.37 70,487.37 70,487.37 70,487.37 70,487.37 70,487.37 70,487.37 569,006.03
MACA 115,695.40 231,390.80 347,086.19 385,651.33 385,651.33 385,651.33 385,651.33 385,651.33 385,651.33 385,651.33 3,113,152.39
AVENA FORRAJERA 11,735.28 23,470.57 35,205.85 39,117.61 39,117.61 39,117.61 39,117.61 39,117.61 39,117.61 39,117.61 315,775.12
TARWI 42,258.21 84,516.42 126,774.63 140,860.70 140,860.70 140,860.70 140,860.70 140,860.70 140,860.70 140,860.70 1,137,091.44
ARVEJA GS 68,863.67 137,727.35 206,591.02 229,545.58 229,545.58 229,545.58 229,545.58 229,545.58 229,545.58 229,545.58 1,852,996.03
HABA 90,815.57 181,631.14 272,446.72 302,718.57 302,718.57 302,718.57 302,718.57 302,718.57 302,718.57 302,718.57 2,443,681.61
FRIJOL 130,138.10 260,276.19 390,414.29 433,793.65 433,793.65 433,793.65 433,793.65 433,793.65 433,793.65 433,793.65 3,501,779.10
QUINUA 263,445.06 526,890.11 790,335.17 878,150.19 878,150.19 878,150.19 878,150.19 878,150.19 878,150.19 878,150.19 7,088,826.57
PALTO (119,938.81) (119,938.81) 130,807.19 381,553.19 682,448.39 682,448.39 682,448.39 682,448.39 682,448.39 682,448.39 4,179,143.00
TOTAL 1,892,895.40 3,905,729.60 6,169,309.81 7,091,000.55 7,391,895.75 7,391,895.75 7,391,895.75 7,391,895.75 7,391,895.75 7,391,895.75 58,340,844.78
Factor de Actualización 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.15 0.14
BENEFICIOS CON PROYECTO (A PRECIOS SOCIALES)
PROGRAMACIÓN ANUAL
VALOR
NOMBRE
ACTUAL
AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 …. AÑO 22 AÑO 23
VAN DE LA PRODUCCION 1,340,974.82 2,538,456.26 3,678,557.87 3,879,020.13 3,709,743.22 3,403,434.15 3,122,416.65 2,864,602.43 1,110,127.54 1,018,465.64 45,049,836.55
S10
Presupuesto
2,915,509.65
31875185.87
0.08000
HOJA RESUMEN
LOCALIDAD
FECHA 01/04/2013
PRESUPUESTO BASE
ITEM DESCRIPCION MONTO
001 CONSTRUCCION DE CANAL S/. 0.00
002 CONSTRUCCION DE REPRESA S/. 44,884,692.18
003 CANAL DE CONDUCCION Y DISTRIBUCION S/. 0.00
005 OBRAS DE ARTE S/. 0.00
006 FLETE TERRESTRE Y RURAL S/. 0.00
007 MITIGACION AMBIENTAL S/. 0.00
COSTO DIRECTO (INCLUYE IGV) S/. 44,884,692.18
PRECIOS PRECIOS
ITEM DESCRIPCION FC
PRIVADOS SOCIALES
I COSTO DIRECTO
1.10 INSUMOS Y MATERIALES 9,714,075.62 0.847 8,231,707.68
1.20 EQUIPOS 28,704,474.72 0.847 24,324,171.87
1.30 MANO DE OBRA
MANO DE OBRA CALIFICADA 2,193,093.85 0.910 1,995,715.41
MANO DE OBRA NO CALIFICADA 4,273,047.99 0.410 1,751,949.68
II COSTO DIRECTO
2.10 GASTOS GENERALES + UTILIDAD 8,704,579.40 0.847 7,376,260.58
2.20 GASTOS DE SUPERVISION Y LIQUIDACION 2,915,509.65 0.847 2,470,602.88
III ESTUDIOS
3.10 SUPERVISION DE EXPEDIENTE TECNICO 99,832.08 0.847 84,603.46
AÑOS
ITEM ACTIVIDADES TOTAL (S/.)
0 1 2 3 4 5 6 7 8 9 10
I INVERSION 56,504,781.23 56,504,781.23
INFRAESTRUCTURA DE RIEGO 44,884,692.18 44,884,692.18
GASTOS DE SUPERVISION 2,915,509.65 2,915,509.65
GASTOS GENERALES 4,540,592.18 4,540,592.18
UTILIDAD 4,163,987.22 4,163,987.22
SUPERVISION DE EXPEDIENTE TECNICO 99,832.08
II OPERACIÓN Y MANTENIMIENTO - 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 420,919.80
OPERACIÓN 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 158,400.00
MANTENIMIENTO 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 148,760.00
GASTOS GENERALES 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 113,759.80
III TOTAL COSTOS DEL PROYECTO 56,504,781.23 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 56,925,701.03
V TOTAL COSTOS INCREMENTALES DEL PROYECTO 56,504,781.23 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 56,925,701.03
FACTOR DE ACTUALIZACION ( 4 ) 9% 1.00 0.92 0.84 0.77 0.71 0.65 0.60 0.55 0.50 0.46 0.42
VI VALOR ACTUAL COSTOS INCREMENTALES 56,504,781.23 38,616.50 35,427.98 32,502.73 29,819.02 27,356.90 25,098.07 23,025.75 21,124.55 19,380.32 17,780.11 56,774,913.15
DEL PROYECTO
COSTOS INCREMENTALES DEL PROYEC
OBRA:
MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CHACCO - RUNCUHUASI - CAMPANAYOCC
ITEM ACTIVIDADES
0 1 2
I INVERSION 23,159,807.51 23,075,204.05
EQUIPOS 12,162,085.94 12,162,085.94
INSUMOS Y MATERIALES 4,115,853.84 4,115,853.84
MANO DE OBRA
MANO DE OBRA CALIFICADA 997,857.70 997,857.70
MANO DE OBRA NO CALIFICADA 875,974.84 875,974.84
GASTOS DE SUPERVISION 1,235,301.44 1,235,301.44
GASTOS GENERALES+ UTILIDADES 3,688,130.29 3,688,130.29
SUPERVISION DE ESTUDIOS 84,603.46
OPERACIÓN
OPERACIÓN 14,180.34
COSTOS INDIRECTOS
GASTOS GENERALES 9,971.68
Recuperación de O&M (AÑO 11-20)
- -
III COSTOS SIN PROYECTO
OPERACIÓN Y MANTENIMIENTO (-) - - -
0 0
ITEM ACTIVIDADES
0 1 2
I INVERSION 23,159,807.51 23,075,204.05
EQUIPOS 12,162,085.94 12,162,085.94
INSUMOS Y MATERIALES 4,115,853.84 4,115,853.84
MANO DE OBRA
MANO DE OBRA CALIFICADA 997,857.70 997,857.70
MANO DE OBRA NO CALIFICADA 875,974.84 875,974.84
SERVICIOS Y OTROS
EXPEDIENTES TECNICO
CAPACITACION
GASTOS DE SUPERVISION 1,235,301.44 1,235,301.44
GASTOS GENERALES+ UTILIDADES 3,688,130.29 3,688,130.29
SUPERVISION DE ESTUDIOS 84,603.46
ESTUDIO DE FACTIBILIDAD
GASTOS DE GESTION
COSTOS INDIRECTOS
GASTOS GENERALES 9,971.68
CO - RUNCUHUASI - CAMPANAYOCC - UPIRO Y PATAPATA, DISTRITO DE CHUQUIBAMBILLA - PROVINCIA DE GRAU - REGION APURIMAC
AÑOS
3 4 5 6 7 8 9 10
- - - - - - - 235,905.39
- - - - - - - -
AÑOS
3 4 5 6 7 8 9 10
36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80
- - - - - - - -
TOTAL
(S/.)
44,329,719.48
23,319,962.94
7,891,866.54
-
1,913,323.49
1,679,621.48
2,368,605.51
7,071,736.06
84,603.46
301,830.71
75,580.76
85,014.64
59,782.68
99,648.99
44,631,550.19
44,631,550.19
ECIOS SOCIALES
OS
11 12 13 14 15 16 17 18 19
36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80
-
-
1,235,301.44
3,688,130.29
36,758.80 698,417.19
12,606.78 239,528.81
14,180.34 269,426.46
9,971.68
36,758.80 46,933,428.75
0.18
6,558.91 44,631,550.19
VALOR NETO DE LA PRODUCCION INCREMENTAL (A PRECIOS DE MERCADO)
PROGRAMACIÓN ANUAL
DESCRIPCION
AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9
Situación con Proyecto 3,107,212.21 6,214,424.43 9,572,382.64 10,858,866.05 11,159,761.25 11,159,761.25 11,159,761.25 11,159,761.25 11,159,761.25
(-) Situación sin proyecto 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55
TOTAL 2,566,139.67 5,673,351.88 9,031,310.10 10,317,793.50 10,618,688.70 10,618,688.70 10,618,688.70 10,618,688.70 10,618,688.70
Factor Actualización 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.36
Valor Actual Incremental 1,817,918.04 3,687,289.45 5,385,075.13 5,644,186.38 5,329,161.79 4,889,139.26 4,485,448.86 4,115,090.70 3,775,312.57
COSTO TOTAL INCREMENTAL
Situación con Proyecto 1,809,487.11 3,440,619.80 5,071,752.49 5,615,463.39 5,615,463.39 5,615,463.39 5,615,463.39 5,615,463.39 5,615,463.39
(-) Situación sin proyecto 692,924.79 692,924.79 692,924.79 692,924.79 692,924.79 692,924.79 692,924.79 692,924.79 692,924.79
TOTAL 1,116,562.32 2,747,695.01 4,378,827.70 4,922,538.60 4,922,538.60 4,922,538.60 4,922,538.60 4,922,538.60 4,922,538.60
Factor Actualización 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.36
VA del Costo Incremental 791,000.90 1,785,813.23 2,610,951.89 2,692,797.19 2,470,456.13 2,266,473.52 2,079,333.50 1,907,645.42 1,750,133.41
VALOR NETO DE LA PRODUCCION INCREMENTAL
Situación con Proyecto 1,297,725.10 2,773,804.63 4,500,630.15 5,243,402.66 5,544,297.86 5,544,297.86 5,544,297.86 5,544,297.86 5,544,297.86
(-) Situación sin proyecto (151,852.24) (151,852.24) (151,852.24) (151,852.24) (151,852.24) (151,852.24) (151,852.24) (151,852.24) (151,852.24)
TOTAL 1,449,577.35 2,925,656.87 4,652,482.39 5,395,254.90 5,696,150.10 5,696,150.10 5,696,150.10 5,696,150.10 5,696,150.10
Factor Actualización 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.36
Valor Actual del VALOR NETO DE LA
1,026,917.14 1,901,476.23 2,774,123.24 2,951,389.19 2,858,705.66 2,622,665.74 2,406,115.36 2,207,445.29 2,025,179.16
PRODUCCION INCREMENTAL
CION INCREMENTAL (A PRECIOS DE MERCADO)
PROGRAMACIÓN ANUAL
VALOR ACTUAL
AÑO 10 AÑO 11 AÑO 12 AÑO 13 AÑO 14 AÑO 15
PROGRAMACIÓN ANUAL
CONCEPTOS
AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 … AÑO 22 AÑO 23
Situación con Proyecto 3,107,212.21 6,214,424.43 9,572,382.64 10,858,866.05 11,159,761.25 11,159,761.25 11,159,761.25 11,159,761.25 11,159,761.25 11,159,761.25
(-) Situación sin Proyecto 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55 541,072.55
TOTAL 2,566,139.67 5,673,351.88 9,031,310.10 10,317,793.50 10,618,688.70 10,618,688.70 10,618,688.70 10,618,688.70 10,618,688.70 10,618,688.70
Factor Actualización 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.15 0.14
Valor Actual del VBP Incremental 1,817,918.04 3,687,289.45 5,385,075.13 5,644,186.38 5,329,161.79 4,889,139.26 4,485,448.86 4,115,090.70 1,594,732.83 1,463,057.64
Situación con Proyecto 1,214,316.82 2,308,694.82 3,403,072.83 3,767,865.50 3,767,865.50 3,767,865.50 3,767,865.50 3,767,865.50 3,767,865.50 3,767,865.50
(-) Situación sin Proyecto 496,286.83 496,286.83 496,286.83 496,286.83 496,286.83 496,286.83 496,286.83 496,286.83 496,286.83 496,286.83
TOTAL 718,029.99 1,812,408.00 2,906,786.00 3,271,578.67 3,271,578.67 3,271,578.67 3,271,578.67 3,271,578.67 3,271,578.67 3,271,578.67
Factor Actualización 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.15 0.14
Valor Actual del Costo Incremental 508,670.55 1,177,940.84 1,733,221.52 1,789,665.57 1,641,895.02 1,506,325.70 1,381,950.19 1,267,844.21 491,331.28 450,762.64
VALOR NETO DE LA PRODUCCION INCREMENTAL
Situación con Proyecto 1,892,895.40 3,905,729.60 6,169,309.81 7,091,000.55 7,391,895.75 7,391,895.75 7,391,895.75 7,391,895.75 7,391,895.75 7,391,895.75
(-) Situación sin Proyecto 44,785.72 44,785.72 44,785.72 44,785.72 44,785.72 44,785.72 44,785.72 44,785.72 44,785.72 44,785.72
TOTAL 1,848,109.68 3,860,943.89 6,124,524.10 7,046,214.83 7,347,110.03 7,347,110.03 7,347,110.03 7,347,110.03 7,347,110.03 7,347,110.03
Factor Actualización 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.15 0.14
Valor Actual del VNP Incremental 1,309,247.49 2,509,348.61 3,651,853.61 3,854,520.81 3,687,266.78 3,382,813.56 3,103,498.68 2,847,246.49 1,103,401.55 1,012,295.00
N INCREMENTAL (A PRECIOS SOCIALES)
VALOR ACTUAL
88,883,430.21
4,939,205.44
83,944,224.77
1.00
64,820,343.61
30,542,585.43
4,530,376.97
26,012,208.47
1.00
20,086,197.66
58,340,844.78
408,828.47
57,932,016.30
1.00
44,734,145.96
FLUJO DE CAJA DEL PROYECTO A PRECIOS DE MERCADO - ALTERNATIVA I
PROGRAMACIÓN ANUAL
RUBROS
AÑO 0 AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10
0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85
1. INGRESOS INCREMENTALES DEL PROYECTO
Venta de Agua para Riego con Proyecto 0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85
(-) Venta de Agua para Riego Sin Proyecto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2. COSTOS EVITADOS (RECONSTRUCCION DE LA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
INFRAESTRUCTURA A PRECIOS PRIVADOS)
3. INCREMENTO EN EL VALOR NETO DE LA
0.00 1,449,577.35 2,925,656.87 4,652,482.39 5,395,254.90 5,696,150.10 5,696,150.10 5,696,150.10 5,696,150.10 5,696,150.10 5,696,150.10
PRODUCCION
4. COSTOS INCREMENTALES DEL PROYECTO 56,604,613.31 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98
INVERSION 56,604,613.31
INFRAESTRUCTURA 53,589,271.58
MITIGACION AMBIENTAL
SUPERVISION 2,915,509.65
CAPACITACION
GASTOS DE GESTION
COSTOS DE OPERACIÓN Y MANTENIMIENTO 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98 42,091.98
Operación 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00 15,840.00
Mantenimiento 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00 14,876.00
Gastos Generales 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98 11,375.98
COSTOS SIN PROYECTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Operación 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mantenimiento 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos Generales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4. FLUJO NETO (56,604,613.31) 1,444,244.22 2,920,323.74 4,647,149.26 5,389,921.77 5,690,816.97 5,690,816.97 5,690,816.97 5,690,816.97 5,690,816.97 5,690,816.97
5. FACTOR DE ACTUALIZACIÓN 1.00 0.92 0.84 0.77 0.71 0.65 0.60 0.55 0.50 0.46 0.42
(56,604,613.31) 1,324,994.69 2,457,978.07 3,588,451.89 3,818,356.47 3,698,640.56 3,393,248.22 3,113,071.76 2,856,029.14 2,620,210.22 2,403,862.59
6. VALOR ACTUAL DEL FLUJO NETO (VAN)
7. TASA INTERNA DE RETORNO (TIR)
8. RATIO B/C
O A PRECIOS DE MERCADO - ALTERNATIVA I
VALOR ACTUAL
216,427.26
216,427.26
0.00
0.00
0.00
29,309,069.83
56,874,745.23
99,832.08
53,589,271.58
0.00
2,915,509.65
0.00
0.00
0.00
270,131.92
0.00
(27,329,769.68)
1.00
(27,329,769.68)
-2.43%
0.52
FLUJO DE CAJA A PRECIOS SOCIALES DEL PROYECTO
PROGRAMACIÓN ANUAL
RUBROS AÑO 0 AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9
1. INGRESOS INCREMENTALES DEL PROYECTO 0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85
Venta de Agua para Riego con Proyecto 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85
(-) Venta de Agua para Riego sin Proyecto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3. COSTOS INCREMENTALES DEL PROYECTO 46,235,011.56 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80
INVERSION 46,235,011.56
EXPEDIENTE TECNICO 84,603.46
INFRAESTRUCTURA 36,303,544.64
GASTOS GENERALES+UTILIDAD 7,376,260.58
SUPERVISION 2,470,602.88
CAPACITACION
ESTUDIO DE IMPACTO AMBIENTAL
ESTUDIO DE FACTIBILIDAD
GASTOS DE GESTION 0.00
COSTOS DE OPERACIÓN Y MANTENMIENTO 0.00 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80
Operación 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34
Mantenimiento 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78
Gastos Generales 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68
Recuperación O&M (año 11-20)
COSTOS SIN PROYECTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Operación 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mantenimiento 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos Generales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4. FLUJO NETO (46,235,011.56) 1,848,109.73 3,860,943.94 6,124,524.15 7,046,214.88 7,347,110.08 7,347,110.08 7,347,110.08 7,347,110.08 7,347,110.08
5. FACTOR DE ACTUALIZACIÓN 1.00 0.92 0.84 0.77 0.71 0.65 0.60 0.55 0.50 0.46
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (46,235,011.56) 1,695,513.51 3,249,679.27 4,729,256.37 4,991,716.27 4,775,117.44 4,380,841.69 4,019,120.82 3,687,266.80 3,382,813.58
36,758.85 235,905.72
36,758.85 235,905.72
0.00 0.00
0.00 0.00
7,347,110.03 38,014,824.12
272,664.19 46,570,565.94
84,603.46
36,303,544.64
7,376,260.58
2,470,602.88
0.00
0.00
272,664.19 335,554.38
14,180.34
12,606.78
9,971.68
235,905.39
0.00 0.00
0.00
0.00
0.00
7,111,204.69 (8,319,836.10)
0.42 1.00
3,003,849.71 (8,319,836.10)
5.25%
0.821
FLUJO DE CAJA A PRECIOS SOCIALES DEL PROYECTO
"CONSTRUCCION DEL SISTEMA DE RIEGO CUSHUROCOCHA - HUARCO CURAN - CAJACAY" N° SNIP 42846
PROGRAMACIÓN ANUAL
RUBROS VALOR ACTUAL
AÑO 0 AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 …. AÑO 22 AÑO 23
1. INGRESOS INCREMENTALES DEL PROYECTO 0.00 0.00 0.00 0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 259,109.90
Venta de Agua para Riego con Proyecto 0.00 0.00 0.00 0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 259,109.90
(-) Venta de Agua para Riego sin Proyecto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2. COSTOS EVITADOS ( RECONSTRUCCION DE LA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
INFRAESTRUCTURA A PRECIOS SOCIALES)
3. INCREMENTO EN EL VALOR NETO DE LA
0.00 0.00 0.00 0.00 1,848,109.68 3,860,943.89 6,124,524.10 7,046,214.83 7,347,110.03 7,347,110.03 7,347,110.03 7,347,110.03 7,347,110.03 7,347,110.03 44,734,145.96
PRODUCCION
3. COSTOS INCREMENTALES DEL PROYECTO 7,007,164.67 6,922,561.21 4,615,040.82 27,690,244.86 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 38,883,584.97
INVERSION 7,007,164.67 6,922,561.21 4,615,040.82 27,690,244.86 38,624,475.42
ESTUDIOS 84,603.46 0.00 0.00 0.00 84,603.46
INFRAESTRUCTURA 5,445,531.69 5,445,531.69 3,630,354.47 21,782,126.78 30,316,827.51
GASTOS GENERALES+UTILIDAD 1,106,439.09 1,106,439.09 737,626.06 4,425,756.35 6,159,861.86
SUPERVISION 370,590.43 370,590.43 247,060.29 1,482,361.73 2,063,182.59
CAPACITACION
ESTUDIO DE IMPACTO AMBIENTAL
ESTUDIO DE FACTIBILIDAD
GASTOS DE GESTION
COSTOS DE OPERACIÓN Y MANTENMIENTO 0.00 0.00 0.00 0.00 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 36,758.80 259,109.55
Operación 0.00 0.00 0.00 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34 14,180.34
Mantenimiento 0.00 0.00 0.00 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78 12,606.78
Gastos Generales 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68 9,971.68
COSTOS SIN PROYECTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Operación 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mantenimiento 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos Generales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4. FLUJO NETO (7,007,164.67) (6,922,561.21) (4,615,040.82) (27,690,244.86) 1,848,109.73 3,860,943.94 6,124,524.15 7,046,214.88 7,347,110.08 7,347,110.08 7,347,110.08 7,347,110.08 7,347,110.08 7,347,110.08 6,109,670.89
5. FACTOR DE ACTUALIZACIÓN 1.00 0.92 0.84 0.77 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.15 0.14 1.00
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (7,007,164.67) (6,350,973.59) (3,884,387.53) (21,381,949.64) 1,309,247.52 2,509,348.65 3,651,853.64 3,854,520.84 3,687,266.80 3,382,813.58 3,103,498.70 2,847,246.51 1,103,401.56 1,012,295.01 6,109,670.89
7,- TASA INTERNA DE RETORNO (TIR) 10.69%
8,- RELACION BENEFICIO COSTO (B/C) 1.157
VAN S/. 6,109,670.89
TIR 10.69%
B/C 1.16
TASA SOCIAL DE DESCUENTO 9%
1
FLUJO DE CAJA A PRECIOS SOCIALES DEL PROYECTO
Proyecto "Construcción del Sistema de Riego Cushurococha-Huarco Curan-Cajacay"
PROGRAMACIÓN ANUAL VALOR
RUBROS AÑO 0 AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 AÑO 11 AÑO 12 AÑO 13 AÑO 14 AÑO 15 AÑO 16 AÑO 17 AÑO 18 AÑO 19 AÑO 20 AÑO 21 AÑO 22 AÑO 23 ACTUAL
1. INGRESOS INCREMENTALES DEL PROYECTO 0.00 0.00 0.00 0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 693,814.32
Venta de Agua para Riego con Proyecto 0.00 0.00 0.00 0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 216,427.26 693,814.32
(-) Venta de Agua para Riego sin Proyecto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2. COSTOS EVITADOS ( RECONSTRUCCION DE LA
INFRAESTRUCTURA A PRECIOS SOCIALES)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3. INCREMENTO EN EL VALOR NETO DE LA
PRODUCCION
0.00 0.00 0.00 0.00 1,994,131.10 3,627,558.88 5,075,672.93 5,075,672.93 4,954,334.35 5,259,553.62 5,492,113.62 5,492,114.62 5,492,115.62 5,492,116.62 5,492,116.62 5,492,116.62 5,492,116.62 5,492,116.62 5,492,116.62 5,492,116.62 5,492,116.62 5,492,116.62 5,492,116.62 5,492,116.62 34,170,455.54
3. COSTOS INCREMENTALES DEL PROYECTO 7,007,164.67 6,922,561.21 4,615,040.82 27,690,244.86 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 38,822,528.56
INVERSION 7,007,164.67 6,922,561.21 4,615,040.82 27,690,244.86 38,624,475.42
ESTUDIOS 84,603.46 84,603.46
INFRAESTRUCTURA 5,445,531.69 5,445,531.69 3,630,354.47 21,782,126.78 30,316,827.51
GASTOS GENERALES+UTILIDAD 1,106,439.09 1,106,439.09 737,626.06 4,425,756.35 6,159,861.86
SUPERVISION 370,590.43 370,590.43 247,060.29 1,482,361.73 2,063,182.59
CAPACITACION 0.00
ESTUDIO DE IMPACTO AMBIENTAL 0.00
ESTUDIO DE FACTIBILIDAD
GASTOS DE GESTION
COSTOS DE OPERACIÓN Y MANTENMIENTO 0.00 0.00 0.00 0.00 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 198,053.14
Operación 0.00 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98
Mantenimiento 0.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00
Gastos Generales 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTOS SIN PROYECTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Operación
Mantenimiento
Gastos Generales
4. FLUJO NETO (7,007,164.67) (6,922,561.21) (4,615,040.82) (27,690,244.86) 2,002,792.97 3,636,220.75 5,084,334.80 5,084,334.80 4,962,996.22 5,268,215.49 5,500,775.49 5,500,776.49 5,500,777.49 5,680,446.90 5,680,446.90 5,680,446.90 5,680,446.90 5,680,446.90 5,680,446.90 5,680,446.90 5,680,446.90 5,680,446.90 5,680,446.90 5,680,446.90 (3,958,258.71)
5. FACTOR DE ACTUALIZACIÓN 1.00 0.92 0.84 0.77 0.71 0.65 0.60 0.55 0.50 0.46 0.42 0.39 0.36 0.33 0.30 0.27 0.25 0.23 0.21 0.19 0.18 0.16 0.15 0.14 1.00
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (7,007,164.67) (6,350,973.59) (3,884,387.53) (21,381,949.64) 1,418,829.03 2,363,293.99 3,031,622.72 2,781,305.25 2,490,760.45 2,425,632.76 2,323,587.01 2,131,731.59 1,955,717.41 1,852,840.48 1,699,853.66 1,559,498.77 1,430,732.81 1,312,598.91 1,204,219.18 1,104,788.24 1,013,567.20 929,878.16 853,099.23 782,659.84 (3,958,258.71)
7,- TASA INTERNA DE RETORNO (TIR) 7.80%
8,- RELACION BENEFICIO COSTO (B/C) 0.898
VAN (S/. 3,958,258.71)
TIR 7.80%
B/C 0.90
TASA SOCIAL DE DESCUENTO 9%
1282617.31
1
FLUJO DE CAJA A PRECIOS SOCIALES DEL PROYECTO
Proyecto "Construcción del Sistema de Riego Cushurococha-Huarco Curan-Cajacay"
PROGRAMACIÓN ANUAL
RUBROS AÑO 0 AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10
1. INGRESOS INCREMENTALES DEL PROYECTO 0.00 0.00 0.00 0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85
Venta de Agua para Riego con Proyecto 0.00 0.00 0.00 0.00 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85 36,758.85
(-) Venta de Agua para Riego sin Proyecto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2. COSTOS EVITADOS ( RECONSTRUCCION DE LA
INFRAESTRUCTURA A PRECIOS SOCIALES)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3. INCREMENTO EN EL VALOR NETO DE LA
PRODUCCION
0.00 0.00 0.00 0.00 1,994,131.10 3,627,558.88 5,075,672.93 5,075,672.93 4,954,334.35 5,259,553.62 5,492,113.62
3. COSTOS INCREMENTALES DEL PROYECTO 7,007,164.67 6,922,561.21 4,615,040.82 27,690,244.86 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98
INVERSION 7,007,164.67 6,922,561.21 4,615,040.82 27,690,244.86
ESTUDIOS 84,603.46
INFRAESTRUCTURA 5,445,531.69 5,445,531.69 3,630,354.47 21,782,126.78
GASTOS GENERALES+UTILIDAD 1,106,439.09 1,106,439.09 737,626.06 4,425,756.35
SUPERVISION 370,590.43 370,590.43 247,060.29 1,482,361.73
CAPACITACION
ESTUDIO DE IMPACTO AMBIENTAL
ESTUDIO DE FACTIBILIDAD
GASTOS DE GESTION
COSTOS DE OPERACIÓN Y MANTENMIENTO 0.00 0.00 0.00 0.00 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98 28,096.98
Operación 0.00 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98 20,520.98
Mantenimiento 0.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00 7,576.00
Gastos Generales 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTOS SIN PROYECTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Operación
Mantenimiento
Gastos Generales
4. FLUJO NETO (7,007,164.67) (6,922,561.21) (4,615,040.82) (27,690,244.86) 2,002,792.97 3,636,220.75 5,084,334.80 5,084,334.80 4,962,996.22 5,268,215.49 5,500,775.49
5. FACTOR DE ACTUALIZACIÓN 1.00 0.92 0.84 0.77 0.71 0.65 0.60 0.55 0.50 0.46 0.42
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (7,007,164.67) (6,350,973.59) (3,884,387.53) (21,381,949.64) 1,418,829.03 2,363,293.99 3,031,622.72 2,781,305.25 2,490,760.45 2,425,632.76 2,323,587.01
7,- TASA INTERNA DE RETORNO (TIR)
8,- RELACION BENEFICIO COSTO (B/C)
VAN (S/. 21,789,444.21)
TIR -6.89%
B/C 0.44
TASA SOCIAL DE DESCUENTO 9%
VALOR
ACTUAL
142,858.24
142,858.24
0.00
0.00
16,801,368.04
38,733,670.49
38,624,475.42
84,603.46
30,316,827.51
6,159,861.86
2,063,182.59
0.00
0.00
109,195.06
0.00
(21,789,444.21)
1.00
(21,789,444.21)
-6.89%
0.437
CÁLCULO DE LAS PERDIDAS ECONOMICAS -
1 2
PIP BASE Año 0 Año 1 Año 2
INVERSION -11,762,572.76
Costo de Operación y Mantenimiento
Beneficios 5,321,931.81 5,311,611.44
Beneficios Sociales Netos -11,762,572.76 5,321,931.81 5,311,611.44
VANS 19,446,148.35
TIRS 29.10%
Tasa Social 11.0%
VANS -21,789,444.21
TIRS -6.89%
Tasa Social 9.0%
VANS 19,446,148.35
TIRS 29.10%
Tasa Social 11.0%
VANS 6,109,670.89
TIRS 10.69%
Tasa Social 9.0%
Donde:
VANSsm= Valor Actual de los Costos Sociales "Situacion Modificada"
VANSso= Valor Actual de los Costos Sociales "Situacion Original"
INDICADORES
MONTO DE INVERSION TOTAL
METODOLOGIA COSTO/BENEFICIO