Está en la página 1de 106

SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días

CASCO GRIS
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA M2 30.00 100.00 3,000.00 3,000.00 - - - - -
01.01.01.02 CERCO PROVISIONAL M 80.00 6.96 556.80 556.80 - - - - -
01.01.01.03 CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACIÓN PZA 1.00 500.00 500.00 500.00 - - - - -
01.01.02 INSTALACIONES PROVISIONALES
01.01.02.01 INSTALACION PROVISIONAL DE AGUA GLB 1.00 250.00 250.00 250.00 - - - - -
01.01.02.02 INSTALACION PROVISIONAL DE ELECTRICIDAD GLB 1.00 300.00 300.00 300.00 - - - - -
01.01.02.03 AGUA PARA LA CONSTRUCCION MES 4.00 500.00 2,000.00 2,000.00 - - - - -
01.01.02.04 ELECTRICIDAD PARA LA CONSTRUCCION MES 4.00 350.00 1,400.00 1,400.00 - - - - -
01.01.03 TRABAJOS PRELIMINARES
01.01.03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 1,000.00 1,000.00 1,000.00 - - - - -
01.02 TRAZOS, NIVELES Y REPLANTEO
01.02.01 TRAZO Y REPLANTEO PRELIMINAR M2 300.00 2.62 786.00 786.00 - - - - -
01.02.02 TRAZO DE NIVELES Y REPLANTEO DURANTE LA OBRA M2 360.00 3.07 1,105.20 1,105.20 - - - - -
01.03 LIMPIEZA DEL TERRENO
01.03.01 LIMPIEZA DE TERRENO MANUAL M2 300.00 1.03 309.00 309.00 - - - - -
01.03.02 ELIMINACION MATERIAL ORGANICO M3 30.00 16.24 487.20 487.20 - - - - -
01.03.03 LIMPIEZA PERMANENTE DE LA OBRA MES 4.00 544.00 2,176.00 299.20 353.60 353.60 380.80 326.40 353.60
01.03.04 GUARDIANIA EN OBRA MES 4.00 1,200.00 4,800.00 624.00 624.00 624.00 672.00 576.00 624.00
01.03.05 ACARREO INTERNO DE MATERIALES MES 4.00 1,098.88 4,395.52 714.27 714.27 714.27 769.22 659.33 714.27
01.04 SALUD Y SEGURIDAD
01.04.01 EQUIPOS DE PROTECCION Y PREVENCION COVID GLB 1.00 2,976.00 2,976.00 2,976.00 - - - - -

Página 1 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
01.04.02 EQUIPOS DE PROTECCION INDIVIDUAL JGO 12.00 162.00 1,944.00 1,944.00 - - - - -
01.04.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 94.39 94.39 94.39 - - - - -
01.04.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 153.40 153.40 153.40 - - - - -
01.04.05 EQUIPOS PARA EMERGENCIAS GLB 1.00 150.00 150.00 150.00 - - - - -
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACIONES
02.01.01.01 EXCAVACION PARA SUBZAPATA ZAPATAS Y CIMIENTOS M3 102.67 22.96 2,357.30 2,357.30 - - - - -
02.01.02 RELLENOS
02.01.02.01 RELLENO MANUAL CON MATERIAL PROPIO M3 40.25 11.39 458.45 - 458.45 - - - -
02.01.02.02 NIVELACION INTERIOR Y APISONADO M2 300.00 2.35 705.00 - 705.00 - - - -
02.01.02.03 ELIMINACION MATERIAL EXCEDENTE C/MAQUINA M3 93.16 16.24 1,512.92 - 1,512.92 - - - -
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 SUBZAPATAS: CONCRETO 1:12 + 30% P.M. (INCLU GASOLINA Y ACEITE) M3 14.67 177.43 2,602.90 2,602.90 - - - - -
02.02.02 FALSO PISO MEZCLA 1:8 e=4" M2 247.00 26.90 6,644.30 - 6,644.30 - - - -
02.02.03 CIMIENTOS CORRIDOS: CONCRETO 1:10 + 30% P.M. (INCLU GASOLINA Y ACEITE) M3 43.36 177.43 7,693.36 7,693.36 - - - - -
02.02.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.15 MT M3 8.55 255.65 2,185.81 2,185.81 - - - - -
02.02.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 mt. M2 99.59 22.82 2,272.64 2,272.64 - - - - -
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 M3 9.79 326.38 3,195.26 1,597.63 1,597.63 - - - -
02.03.01.02 ZAPATAS, ENCOFRADO Y DESENCOFRADO M2 29.14 30.47 887.90 887.90 - - - - -
02.03.01.03 ZAPATAS, ACERO fy=4200 kg/cm2 KG 261.43 4.23 1,105.85 1,105.85 - - - - -
02.03.02 VIGAS DE CIMENTACION
02.03.02.01 VIGAS DE CIMENT, CONC 210 KG/CM2 M3 1.83 337.82 618.21 309.11 309.10 - - - -
02.03.02.02 VIGAS DE CIMENT, ENCOF. Y DESENCOF M2 18.28 30.24 552.79 552.79 - - - - -

Página 2 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
02.03.02.03 VIGAS DE CIMENT, ACERO fy=4200 kg/cm2 KG 324.14 4.23 1,371.11 1,371.11 - - - - -
02.03.03 PRIMER NIVEL
02.03.03.01 COLUMNAS Y PLACAS
02.03.03.01.01 COLUMNAS, CONCRETO 210 KG/CM2 M3 15.84 375.42 5,946.65 743.33 5,203.32 - - - -
02.03.03.01.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 220.84 29.52 6,519.20 1,629.80 4,889.40 - - - -
02.03.03.01.03 COLUMNAS, ACERO fy=4200 kg/cm2 KG 3,121.04 4.32 13,482.89 5,056.08 8,426.81 - - - -
02.03.03.02 VIGAS
02.03.03.02.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 10.77 381.34 4,107.03 - - 4,107.03 - - -
02.03.03.02.02 VIGAS, ENCOFRADO Y DESENCOFRADO M2 78.74 33.17 2,611.81 - 1,865.58 746.23 - - -
02.03.03.02.03 VIGAS, ACERO fy=4200 kg/cm2 KG 1,279.35 4.23 5,411.65 - 4,638.56 773.09 - - -
02.03.03.03 LOSA ALIGERADA H=20CM
02.03.03.03.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 11.75 381.34 4,480.75 - - 4,480.75 - - -
02.03.03.03.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 85.00 20.03 1,702.55 - 1,216.11 486.44 - - -
02.03.03.03.03 LOSA ALIGERADA, LADR. HUECO 15x30x30 UND 1,105.97 3.14 3,472.75 - 2,480.54 992.21 - - -
02.03.03.03.04 LOSA ALIGERADA, ACERO fy=4200 kg/cm2 KG 580.56 4.23 2,455.77 - 2,104.95 350.82 - - -
02.03.03.04 LOSA ALIGERADA H=25CM
02.03.03.04.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 9.56 381.34 3,645.61 - - 3,645.61 - - -
02.03.03.04.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 55.00 20.03 1,101.65 - 786.89 314.76 - - -
02.03.03.04.03 LOSA ALIGERADA, LADR. HUECO 20x30x30 UND 757.83 4.43 3,357.19 - 2,397.99 959.20 - - -
02.03.03.04.04 LOSA ALIGERADA, ACERO fy=4200 kg/cm2 KG 421.44 4.23 1,782.69 - 1,528.02 254.67 - - -
02.03.03.05 LOSA MACISA
02.03.03.05.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 0.83 381.34 316.51 - - 316.51 - - -
02.03.03.05.02 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO M2 4.15 26.40 109.56 - 78.26 31.30 - - -
02.03.03.05.03 LOSAS MACIZAS, ACERO fy=4200 kg/cm2 KG 317.92 4.23 1,344.80 - 1,152.69 192.11 - - -
02.03.03.06 ESCALERAS
02.03.03.06.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 5.29 381.34 2,017.29 - - 2,017.29 - - -

Página 3 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
02.03.03.06.02 ESCALERAS, ENCOFRADO Y DESENCOFRADO M2 29.75 21.70 645.58 - 461.13 184.45 - - -
02.03.03.06.03 ESCALERAS, ACERO fy=4200 kg/cm2 KG 472.80 4.23 1,999.94 - 1,714.23 285.71 - - -
02.03.03.07 VARIOS
02.03.03.07.01 JUNTA SISMICA EN MUROS E=1" M 100.00 4.52 452.00 452.00 - - - - -
02.03.04 SEGUNDO NIVEL
02.03.04.01 COLUMNAS Y PLACAS
02.03.04.01.01 COLUMNAS, CONCRETO 210 KG/CM2 M3 14.38 375.42 5,398.54 - - 4,318.83 1,079.71 - -
02.03.04.01.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 212.10 29.52 6,261.19 - - 6,261.19 - - -
02.03.04.01.03 COLUMNAS, ACERO fy=4200 kg/cm2 KG 3,025.00 4.32 13,068.00 - 10,454.40 2,613.60 - - -
02.03.04.02 VIGAS
02.03.04.02.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 17.29 381.34 6,593.37 - - - 6,593.37 - -
02.03.04.02.02 VIGAS, ENCOFRADO Y DESENCOFRADO M2 134.34 33.17 4,456.06 - - - 4,456.06 - -
02.03.04.02.03 VIGAS, ACERO fy=4200 kg/cm2 KG 3,346.51 4.23 14,155.74 - - - 14,155.74 - -
02.03.04.03 LOSA ALIGERADA H=20CM
02.03.04.03.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 6.71 381.34 2,558.79 - - - 2,558.79 - -
02.03.04.03.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 33.53 20.03 671.61 - - - 671.61 - -
02.03.04.03.03 LOSA ALIGERADA, LADR. HUECO 15x30x30 UND 520.08 3.14 1,633.05 - - - 1,633.05 - -
02.03.04.03.04 LOSA ALIGERADA, ACERO fy=4200 kg/cm2 KG 289.09 4.23 1,222.85 - - - 1,222.85 - -
02.03.04.04 LOSA ALIGERADA H=25CM
02.03.04.04.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 22.74 381.34 8,671.67 - - - 8,671.67 - -
02.03.04.04.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 90.94 20.03 1,821.53 - - - 1,821.53 - -
02.03.04.04.03 LOSA ALIGERADA, LADR. HUECO 20x30x30 UND 757.83 4.43 3,357.19 - - - 3,357.19 - -
02.03.04.04.04 LOSA ALIGERADA, ACERO fy=4200 kg/cm2 KG 421.44 4.23 1,782.69 - - - 1,782.69 - -
02.03.04.05 LOSA MACISA
02.03.04.05.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 5.51 381.34 2,101.18 - - - 2,101.18 - -
02.03.04.05.02 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO M2 27.54 26.40 727.06 - - - 727.06 - -

Página 4 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
02.03.04.05.03 LOSAS MACIZAS, ACERO fy=4200 kg/cm2 KG 629.97 4.23 2,664.77 - - - 2,664.77 - -
02.03.05 TERCER NIVEL
02.03.05.01 COLUMNAS Y PLACAS
02.03.05.01.01 COLUMNAS, CONCRETO 210 KG/CM2 M3 2.03 375.42 762.10 - - - - 762.10 -
02.03.05.01.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 36.72 29.52 1,083.97 - - - 361.32 722.65 -
02.03.05.01.03 COLUMNAS, ACERO fy=4200 kg/cm2 KG 434.00 4.32 1,874.88 - - - 1,249.92 624.96 -
02.03.05.02 VIGAS
02.03.05.02.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 0.35 381.34 133.47 - - - - 133.47 -
02.03.05.02.02 VIGAS, ENCOFRADO Y DESENCOFRADO M2 2.14 33.17 70.98 - - - - 70.98 -
02.03.05.02.03 VIGAS, ACERO fy=4200 kg/cm2 KG 125.00 4.23 528.75 - - - - 528.75 -
02.03.05.03 LOSA MACISA
02.03.05.03.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 1.60 381.34 610.14 - - - - 610.14 -
02.03.05.03.02 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO M2 8.40 26.40 221.76 - - - - 221.76 -
02.03.05.03.03 LOSAS MACIZAS, ACERO fy=4200 kg/cm2 KG 203.00 4.23 858.69 - - - - 858.69 -
02.03.06 VARIOS
02.03.06.01 JUNTA SISMICA EN MUROS E=1" M 200.00 4.52 904.00 - - - - 904.00 -
03 ARQUITECTURA
03.01 PRIMER NIVEL
03.01.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01.01 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*) M2 165.00 61.01 10,066.65 - 9,347.60 719.05 - - -
03.01.01.02 MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 CM (*) M2 32.15 88.83 2,855.88 - 2,855.88 - - - -
03.01.02 REVOQUES Y REVESTIMIENTOS
03.01.02.01 TARRAJEO EN MUROS EXTERIORES M2 200.00 25.16 5,032.00 - - - - 5,032.00 -
03.01.02.02 TARRAJEO EN MUROS INTERIORES M2 400.00 15.37 6,148.00 - - - - 6,148.00 -
03.01.02.03 TARRAJEO DE SUPERFICIE VIGAS PERALTADAS M2 78.74 25.13 1,978.74 - - - - 1,978.74 -
03.01.02.04 TARRAJEO PRIMARIO, MORTERO C:A 1:5 M2 149.95 12.89 1,932.86 - - - - 1,932.86 -

Página 5 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
03.01.03 CIELORRASOS
03.01.03.01 CIELO RASO CON MEZCLA C:A 1:5 M2 168.74 20.68 3,489.54 - - - 1,395.82 2,093.72 -
03.01.03.02 VESTIDURA EN FONDO DE ESCALERAS M2 29.75 23.47 698.23 - - - 279.29 418.94 -
03.01.04 PISOS Y PAVIMENTOS
03.01.04.01 CONTRAPISO DE 48 mm M2 180.00 21.10 3,798.00 - - - - 1,899.00 1,899.00
03.01.04.02 VEREDAS DE CONCRETO 175 kg/cm2 e=4", FROT. Y BRUÑADO M2 14.40 43.93 632.59 - - - - 316.30 316.29
03.02 SEGUNDO NIVEL
03.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.02.01.01 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*) M2 157.97 61.01 9,637.75 - - 6,884.11 2,753.64 - -
03.02.01.02 MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 CM (*) M2 22.02 88.83 1,956.04 - - 1,956.04 - - -
03.02.02 REVOQUES Y REVESTIMIENTOS
03.02.02.01 TARRAJEO EN MUROS EXTERIORES M2 200.00 25.16 5,032.00 - - - - - 4,403.00
03.02.02.02 TARRAJEO EN MUROS INTERIORES M2 400.00 15.37 6,148.00 - - - - - 5,379.50
03.02.02.03 TARRAJEO DE SUPERFICIE VIGAS PERALTADAS M2 134.34 25.13 3,375.96 - - - - - 2,953.97
03.02.02.04 TARRAJEO PRIMARIO, MORTERO C:A 1:5 M2 38.95 12.89 502.07 - - - - - 439.31
03.02.03 CIELORRASOS
03.02.03.01 CIELO RASO CON MEZCLA C:A 1:5 M2 169.00 20.68 3,494.92 - - - - - 3,494.92
03.02.04 PISOS Y PAVIMENTOS
03.02.04.01 CONTRAPISO DE 48 mm M2 180.00 21.10 3,798.00 - - - - - -
03.03 TERCER NIVEL
03.03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.03.01.01 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*) M2 30.82 61.01 1,880.33 - - - 1,253.55 626.78 -
03.03.01.02 MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 CM (*) M2 11.64 88.83 1,033.98 - - - 1,033.98 - -
03.03.02 REVOQUES Y REVESTIMIENTOS
03.03.02.01 TARRAJEO EN MUROS EXTERIORES M2 70.11 25.16 1,763.97 - - - - - -
03.03.02.02 TARRAJEO EN MUROS INTERIORES M2 130.00 15.37 1,998.10 - - - - - -

Página 6 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
03.03.03 PISOS Y PAVIMENTOS
03.03.03.01 CONTRAPISO DE 48 mm M2 29.61 21.10 624.77 - - - - - -
03.04 PINTURA
03.04.01 PINTURA LATEX EN CIELO RASO M2 501.14 8.03 4,024.15 - - - - - -
03.04.02 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA M2 1,400.00 7.52 10,528.00 - - - - - -
03.05 CUBIERTAS
03.05.01 ENCHAPE CON LADRILLO PASTELERO M2 210.00 59.31 12,455.10 - - - - - -
04 INSTALACIONES SANITARIAS
04.01 SISTEMA DE AGUA FRIA
04.01.01 SALIDA DE AGUA FRIA. - PVC PTO 18.00 39.91 718.38 - - 215.51 251.43 215.51 35.93
04.01.02 TUBERIA PVC CLASE 10 - 1 1/2" M 6.30 17.64 111.13 - - 33.34 38.90 33.34 5.55
04.01.03 TUBERIA PVC CLASE 10 - 1" M 42.35 12.67 536.57 - - 160.97 187.80 160.97 26.83
04.01.04 TUBERIA PVC CLASE 10 - 3/4" M 24.01 10.92 262.19 - - 78.66 91.77 78.66 13.10
04.01.05 TUBERIA PVC CLASE 10 - 1/2" M 52.56 9.96 523.50 - - 157.05 183.23 157.05 26.17
04.01.06 VALVULA DE COMPUERTA DE BRONCE 1/2" UND 12.00 27.37 328.44 - - 98.53 114.95 98.53 16.43
04.01.07 VALVULA DE COMPUERTA DE BRONCE 3/4" UND 2.00 35.77 71.54 - - 21.46 25.04 21.46 3.58
04.01.08 VALVULA DE COMPUERTA DE BRONCE 1" UND 1.00 58.93 58.93 - - 17.68 20.63 17.68 2.94
04.01.09 VALVULA DE COMPUERTA DE BRONCE 1 1/2" UND 1.00 92.33 92.33 - - 27.70 32.32 27.70 4.61
04.01.10 LLAVE DE RIEGO C/GRIFO DE 1/2" PZA 4.00 28.42 113.68 - - 34.10 39.79 34.10 5.69
04.02 SISTEMA DE AGUA CALIENTE
04.02.01 SALIDA DE AGUA CALIENTE - H-3 PTO 21.00 63.23 1,327.83 - - 398.35 464.74 398.35 66.39
04.02.02 TUBERIA H-3 1/2" M 25.01 13.99 349.89 - - 104.97 122.46 104.97 17.49
04.02.03 TUBERIA H-3 3/4" M 28.97 18.33 531.02 - - 159.31 185.86 159.31 26.54
04.02.04 VALVULA DE COMPUERTA DE BRONCE 1/2" UND 7.00 27.37 191.59 - - 57.48 67.06 57.48 9.57
04.02.05 VALVULA DE COMPUERTA DE BRONCE 3/4" UND 2.00 35.77 71.54 - - 21.46 25.04 21.46 3.58
04.03 SISTEMA DE DRENAJE PLUVIAL

Página 7 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
04.03.01 TUBERIA DE BAJADA PVC-SAL 3" P/LLUVIAS M 20.40 11.39 232.36 - - 69.71 81.33 69.71 11.61
04.04 DESAGÜE Y VENTILACION
04.04.01 SALIDA DE DESAGUE EN PVC 2" PTO 10.00 19.44 194.40 - - 58.32 68.04 58.32 9.72
04.04.02 SALIDA DE DESAGUE EN PVC 4" PTO 4.00 35.50 142.00 - - 42.60 49.70 42.60 7.10
04.04.03 SALIDA PARA VENTILACION PTO 4.00 17.39 69.56 - - 20.87 24.35 20.87 3.47
04.04.04 TUBERIA PVC-SAL 2" M 60.71 16.06 975.00 - - 292.50 341.25 292.50 48.75
04.04.05 TUBERIA PVC-SAL 4" M 116.83 19.24 2,247.81 - - 674.34 786.73 674.34 112.40
04.04.06 YEE PVC SAL 2" UND 6.00 3.42 20.52 - - 6.16 7.18 6.16 1.02
04.04.07 YEE PVC SAL 4" UND 18.00 8.67 156.06 - - 46.82 54.62 46.82 7.80
04.04.08 TRAMPA P PVC 2" UND 15.00 27.17 407.55 - - 122.27 142.64 122.27 20.37
04.04.09 SOMBRERO PARA VENTILACION DE PVC DE 2" UND 4.00 5.00 20.00 - - 6.00 7.00 6.00 1.00
04.04.10 CAJA DE REGISTRO UND 4.00 108.77 435.08 - - 130.52 152.28 130.52 21.76
05 INSTALACIONES ELECTRICAS Y MECANICAS
05.01 SALIDA PARA LUZ, TOMACORRIENTES Y CAJAS
05.01.01 SALIDA DE TECHO (CENTRO DE LUZ) PTO 68.00 15.69 1,066.92 - - 320.08 373.42 320.08 53.34
05.01.02 SALIDA DE PARED (BRAQUETES) PTO 32.00 13.99 447.68 - - 134.30 156.69 134.30 22.39
05.01.03 SALIDA DE PISO PTO 10.00 13.99 139.90 - - 41.97 48.97 41.97 6.99
05.01.04 CAJA DE PASE PVC 100x100x50 mm UND 6.00 23.99 143.94 - - 43.18 50.38 43.18 7.20
05.01.05 SALIDA INTERRUPTOR SIMPLE PTO 16.00 13.57 217.12 - - 65.14 75.99 65.14 10.85
05.01.06 SALIDA INTERRUPTOR DOBLE PTO 7.00 14.17 99.19 - - 29.76 34.72 29.76 4.95
05.01.07 SALIDA INTERRUPTOR CONMUTACION DOBLE PTO 15.00 14.17 212.55 - - 63.77 74.39 63.77 10.62
05.01.08 SALIDA INTERRUPTOR TRIPLE PTO 1.00 14.17 14.17 - - 4.25 4.96 4.25 0.71
05.01.09 SALIDA TOMACORRIENTE DOBLE CON PUESTA A TIERRA PTO 47.00 14.46 679.62 - - 203.89 237.87 203.89 33.97
05.01.10 SALIDA DE FUERZA PTO 2.00 13.97 27.94 - - 8.38 9.78 8.38 1.40
05.01.11 SALIDA DE FUERZA PARA COCINA PTO 2.00 13.97 27.94 - - 8.38 9.78 8.38 1.40
05.02 CABLEADO

Página 8 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
05.02.01 CABLEADO SALIDAS DE ACOMETIDAS A TABLEROS PTO 4.00 132.37 529.48 - - - - - -
05.02.02 CABLEADO SALIDAS DE TOMACORRIENTES PTO 51.00 64.28 3,278.28 - - - - - -
05.02.03 CABLEADO SALIDAS DE ILUMINACION PTO 110.00 76.08 8,368.80 - - - - - -
05.03 CANALIZACIONES Y/O TUBERIAS
05.03.01 TUBERIA PVC (ELECTRICAS) D=20 mm M 77.27 4.09 316.03 - - 94.81 110.61 94.81 15.80
05.03.02 TUBERIA PVC (ELECTRICAS) D=25 mm M 503.45 3.70 1,862.77 - - 558.83 651.97 558.83 93.14
05.04 TABLEROS DE DISTRIBUCION
05.04.01 TABLERO DE DISTRIBUCION PZA 2.00 118.63 237.26 - - 71.18 83.04 71.18 11.86
05.05 SISTEMA DE PUESTA A TIERRA
05.05.01 SISTEMA DE PUESTA A TIERRA (SISTEMA ESTABILIZADO GENERAL) JGO 3.00 1,224.50 3,673.50 - - - - - -
06 INSTALACIONES DE COMUNICACIONES
06.01 SALIDA DE TELEFONIA Y DATA PTO 17.00 16.40 278.80 - - 83.64 97.58 83.64 13.94
06.02 SALIDA PARA INTERCOMUNICADOR PTO 4.00 17.07 68.28 - - 20.48 23.90 20.48 3.42
06.03 CAJA DE PASE PVC 100x100x50 mm UND 12.00 23.99 287.88 - - 86.36 100.76 86.36 14.40
06.04 CANALIZACIONES Y/O TUBERIAS
06.04.01 TUBERIA PVC (ELECTRICAS) D=20 mm M 77.27 4.09 316.03 - - 94.81 110.61 94.81 15.80
06.04.02 TUBERIA PVC (ELECTRICAS) D=25 mm M 503.45 3.70 1,862.77 - - 558.83 651.97 558.83 93.14
07 CERCO PERIMETRICO
07.01 MOVIMIENTO DE TIERRAS
07.01.01 EXCAVACIONES
07.01.01.01 EXCAVACION PARA SUBZAPATA ZAPATAS Y CIMIENTOS M3 33.86 22.96 777.43 777.43 - - - - -
07.01.01.02 ELIMINACION MATERIAL EXCEDENTE C/MAQUINA M3 42.32 16.24 687.28 - 687.28 - - - -
07.02 OBRAS DE CONCRETO SIMPLE
07.02.01 SUBZAPATAS: CONCRETO 1:12 + 30% P.M. (INCLU GASOLINA Y ACEITE) M3 4.84 177.43 858.76 - 858.76 - - - -
07.02.02 CIMIENTOS CORRIDOS: CONCRETO 1:10 + 30% P.M. (INCLU GASOLINA Y ACEITE) M3 21.77 177.43 3,862.65 - 3,862.65 - - - -
07.02.03 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.15 MT M3 5.22 255.65 1,334.49 - 1,334.49 - - - -

Página 9 de 106
SPECTRA INGENIERIA ESTRUCTURAL

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

: SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

PLAZO DE EJECUCION
01-Set-20 16-Set-20 01-Oct-20 16-Oct-20 01-Nov-20 16-Nov-20
Precio
Item Descripcion Unid Metrado Parcial 15-Set-20 30-Set-20 15-Oct-20 31-Oct-20 15-Nov-20 30-Nov-20
Unitario
15 Días 15 Días 15 Días 16 Días 15 Días 15 Días
07.02.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 mt. M2 69.62 22.82 1,588.73 - 1,588.73 - - - -
07.03 OBRAS DE CONCRETO ARMADO
07.03.01 COLUMNAS, CONCRETO 210 KG/CM2 M3 2.24 375.42 840.94 - - 840.94 - - -
07.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 46.46 29.52 1,371.50 - 1,097.20 274.30 - - -
07.03.03 COLUMNAS, ACERO fy=4200 kg/cm2 KG 300.00 4.32 1,296.00 - 1,296.00 - - - -
08 MUROS Y TABIQUES DE ALBAÑILERIA
08.01 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*) M2 107.25 61.01 6,543.32 - 3,635.18 2,908.14 - - -
09 REVOQUES Y REVESTIMIENTOS
09.01 TARRAJEO EN MUROS INTERIORES M2 137.30 15.37 2,110.30 - - 2,110.30 - - -

COSTO DIRECTO 374,207.99 50,244.50 88,881.92 56,265.27 70,120.34 32,994.29 21,502.58


GASTOS GENERALES 6% 22,452.48 3,014.67 5,332.92 3,375.92 4,207.22 1,979.66 1,290.15
UTILIDAD 5% 18,710.40 2,512.23 4,444.10 2,813.26 3,506.02 1,649.71 1,075.13
PRESUPUESTO TOTAL 415,370.87 55,771.40 98,658.93 62,454.45 77,833.58 36,623.66 23,867.86
TOTAL ACUMULADO 55,771.40 154,430.33 216,884.78 294,718.36 331,342.02 355,209.88
PORCENTAJE DE AVANCE 13.43% 23.75% 15.04% 18.74% 8.82% 5.75%
PORCENTAJE ACUMULADO 13.43% 37.18% 52.22% 70.96% 79.78% 85.53%

Página 10 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días

- - 3,000.00
- - 556.80
- - 500.00

- - 250.00
- - 300.00
- - 2,000.00
- - 1,400.00

- - 1,000.00

- - 786.00
- - 1,105.20

- - 309.00
- - 487.20
108.80 - 2,176.00
624.00 432.00 4,800.00
109.89 - 4,395.52

- - 2,976.00

Página 11 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días
- - 1,944.00
- - 94.39
- - 153.40
- - 150.00

- - 2,357.30

- - 458.45
- - 705.00
- - 1,512.92

- - 2,602.90
- - 6,644.30
- - 7,693.36
- - 2,185.81
- - 2,272.64

- - 3,195.26
- - 887.90
- - 1,105.85

- - 618.21
- - 552.79

Página 12 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días
- - 1,371.11

- - 5,946.65
- - 6,519.20
- - 13,482.89

- - 4,107.03
- - 2,611.81
- - 5,411.65

- - 4,480.75
- - 1,702.55
- - 3,472.75
- - 2,455.77

- - 3,645.61
- - 1,101.65
- - 3,357.19
- - 1,782.69

- - 316.51
- - 109.56
- - 1,344.80

- - 2,017.29

Página 13 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días
- - 645.58
- - 1,999.94

- - 452.00

- - 5,398.54
- - 6,261.19
- - 13,068.00

- - 6,593.37
- - 4,456.06
- - 14,155.74

- - 2,558.79
- - 671.61
- - 1,633.05
- - 1,222.85

- - 8,671.67
- - 1,821.53
- - 3,357.19
- - 1,782.69

- - 2,101.18
- - 727.06

Página 14 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días
- - 2,664.77

- - 762.10
- - 1,083.97
- - 1,874.88

- - 133.47
- - 70.98
- - 528.75

- - 610.14
- - 221.76
- - 858.69

- - 904.00

- - 10,066.65
- - 2,855.88

- - 5,032.00
- - 6,148.00
- - 1,978.74
- - 1,932.86

Página 15 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días

- - 3,489.54
- - 698.23

- - 3,798.00
- - 632.59

- - 9,637.75
- - 1,956.04

629.00 - 5,032.00
768.50 - 6,148.00
421.99 - 3,375.96
62.76 - 502.07

- - 3,494.92

3,798.00 - 3,798.00

- - 1,880.33
- - 1,033.98

1,763.97 - 1,763.97
1,998.10 - 1,998.10

Página 16 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días

624.77 - 624.77

1,564.95 2,459.20 4,024.15


4,094.22 6,433.78 10,528.00

5,812.38 6,642.72 12,455.10

- - 718.38
- - 111.13
- - 536.57
- - 262.19
- - 523.50
- - 328.44
- - 71.54
- - 58.93
- - 92.33
- - 113.68

- - 1,327.83
- - 349.89
- - 531.02
- - 191.59
- - 71.54

Página 17 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días
- - 232.36

- - 194.40
- - 142.00
- - 69.56
- - 975.00
- - 2,247.81
- - 20.52
- - 156.06
- - 407.55
- - 20.00
- - 435.08

- - 1,066.92
- - 447.68
- - 139.90
- - 143.94
- - 217.12
- - 99.19
- - 212.55
- - 14.17
- - 679.62
- - 27.94
- - 27.94

Página 18 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días
185.32 344.16 529.48
1,147.40 2,130.88 3,278.28
2,929.08 5,439.72 8,368.80

- - 316.03
- - 1,862.77

- - 237.26

3,673.50 - 3,673.50

- - 278.80
- - 68.28
- - 287.88

- - 316.03
- - 1,862.77

- - 777.43
- - 687.28

- - 858.76
- - 3,862.65
- - 1,334.49

Página 19 de 106
DISEÑA, SUPERVISA Y CONSTRUYE

lorizado de Avance de Obra

PLAZO DE EJECUCION
01-Dic-20 16-Dic-20
TOTAL
15-Dic-20 30-Dic-20
121 Dias
15 Días 15 Días
- - 1,588.73

- - 840.94
- - 1,371.50
- - 1,296.00

- - 6,543.32

- - 2,110.30

30,316.63 23,882.46 374,207.99


1,819.00 1,432.94 22,452.48
1,515.83 1,194.12 18,710.40
33,651.46 26,509.53 415,370.87
388,861.34 415,370.87
8.10% 6.37%
93.63% 100.00%

Página 20 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias

CASCO GRIS
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA M2 30.00 100.00 3,000.00 3,000.00
01.01.01.02 CERCO PROVISIONAL M 80.00 6.96 556.80 556.80
01.01.01.03 CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACIÓN PZA 1.00 500.00 500.00 500.00
01.01.02 INSTALACIONES PROVISIONALES
01.01.02.01 INSTALACION PROVISIONAL DE AGUA GLB 1.00 250.00 250.00 250.00
01.01.02.02 INSTALACION PROVISIONAL DE ELECTRICIDAD GLB 1.00 300.00 300.00 300.00
01.01.02.03 AGUA PARA LA CONSTRUCCION MES 4.00 500.00 2,000.00 2,000.00
01.01.02.04 ELECTRICIDAD PARA LA CONSTRUCCION MES 4.00 350.00 1,400.00 1,400.00
01.01.03 TRABAJOS PRELIMINARES
01.01.03.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 1,000.00 1,000.00 1,000.00
01.02 TRAZOS, NIVELES Y REPLANTEO
01.02.01 TRAZO Y REPLANTEO PRELIMINAR M2 300.00 2.62 786.00 786.00
01.02.02 TRAZO DE NIVELES Y REPLANTEO DURANTE LA OBRA M2 360.00 3.07 1,105.20 1,105.20
01.03 LIMPIEZA DEL TERRENO
01.03.01 LIMPIEZA DE TERRENO MANUAL M2 300.00 1.03 309.00 309.00
01.03.02 ELIMINACION MATERIAL ORGANICO M3 30.00 16.24 487.20 487.20
01.03.03 LIMPIEZA PERMANENTE DE LA OBRA MES 4.00 544.00 2,176.00 2,176.00
01.03.04 GUARDIANIA EN OBRA MES 4.00 1,200.00 4,800.00 4,800.00
01.03.05 ACARREO INTERNO DE MATERIALES MES 4.00 1,098.88 4,395.52 4,395.52
01.04 SALUD Y SEGURIDAD
01.04.01 EQUIPOS DE PROTECCION Y PREVENCION COVID GLB 1.00 2,976.00 2,976.00 2,976.00
01.04.02 EQUIPOS DE PROTECCION INDIVIDUAL JGO 12.00 162.00 1,944.00 1,944.00
01.04.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 94.39 94.39 94.39
01.04.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 153.40 153.40 153.40
01.04.05 EQUIPOS PARA EMERGENCIAS GLB 1.00 150.00 150.00 150.00
02 ESTRUCTURAS

Página 21 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACIONES
02.01.01.01 EXCAVACION PARA SUBZAPATA ZAPATAS Y CIMIENTOS M3 102.67 22.96 2,357.30 2,357.30
02.01.02 RELLENOS
02.01.02.01 RELLENO MANUAL CON MATERIAL PROPIO M3 40.25 11.39 458.45 458.45
02.01.02.02 NIVELACION INTERIOR Y APISONADO M2 300.00 2.35 705.00 705.00
02.01.02.03 ELIMINACION MATERIAL EXCEDENTE C/MAQUINA M3 93.16 16.24 1,512.92 1,512.92
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 SUBZAPATAS: CONCRETO 1:12 + 30% P.M. (INCLU GASOLINA Y ACEITE) M3 14.67 177.43 2,602.90 2,602.90
02.02.02 FALSO PISO MEZCLA 1:8 e=4" M2 247.00 26.90 6,644.30 6,644.30
02.02.03 CIMIENTOS CORRIDOS: CONCRETO 1:10 + 30% P.M. (INCLU GASOLINA Y ACEITE) M3 43.36 177.43 7,693.36 7,693.36
02.02.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.15 MT M3 8.55 255.65 2,185.81 2,185.81
02.02.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 mt. M2 99.59 22.82 2,272.64 2,272.64
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 M3 9.79 326.38 3,195.26 3,195.26
02.03.01.02 ZAPATAS, ENCOFRADO Y DESENCOFRADO M2 29.14 30.47 887.90 887.90
02.03.01.03 ZAPATAS, ACERO fy=4200 kg/cm2 KG 261.43 4.23 1,105.85 1,105.85
02.03.02 VIGAS DE CIMENTACION
02.03.02.01 VIGAS DE CIMENT, CONC 210 KG/CM2 M3 1.83 337.82 618.21 618.21
02.03.02.02 VIGAS DE CIMENT, ENCOF. Y DESENCOF M2 18.28 30.24 552.79 552.79
02.03.02.03 VIGAS DE CIMENT, ACERO fy=4200 kg/cm2 KG 324.14 4.23 1,371.11 1,371.11
02.03.03 PRIMER NIVEL
02.03.03.01 COLUMNAS Y PLACAS
02.03.03.01.01 COLUMNAS, CONCRETO 210 KG/CM2 M3 15.84 375.42 5,946.65 5,946.65
02.03.03.01.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 220.84 29.52 6,519.20 6,519.20
02.03.03.01.03 COLUMNAS, ACERO fy=4200 kg/cm2 KG 3,121.04 4.32 13,482.89 13,482.89
02.03.03.02 VIGAS
02.03.03.02.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 10.77 381.34 4,107.03 4,107.03
02.03.03.02.02 VIGAS, ENCOFRADO Y DESENCOFRADO M2 78.74 33.17 2,611.81 2,611.81
02.03.03.02.03 VIGAS, ACERO fy=4200 kg/cm2 KG 1,279.35 4.23 5,411.65 5,411.65

Página 22 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias
02.03.03.03 LOSA ALIGERADA H=20CM
02.03.03.03.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 11.75 381.34 4,480.75 4,480.75
02.03.03.03.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 85.00 20.03 1,702.55 1,702.55
02.03.03.03.03 LOSA ALIGERADA, LADR. HUECO 15x30x30 UND 1,105.97 3.14 3,472.75 3,472.75
02.03.03.03.04 LOSA ALIGERADA, ACERO fy=4200 kg/cm2 KG 580.56 4.23 2,455.77 2,455.77
02.03.03.04 LOSA ALIGERADA H=25CM
02.03.03.04.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 9.56 381.34 3,645.61 3,645.61
02.03.03.04.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 55.00 20.03 1,101.65 1,101.65
02.03.03.04.03 LOSA ALIGERADA, LADR. HUECO 20x30x30 UND 757.83 4.43 3,357.19 3,357.19
02.03.03.04.04 LOSA ALIGERADA, ACERO fy=4200 kg/cm2 KG 421.44 4.23 1,782.69 1,782.69
02.03.03.05 LOSA MACISA
02.03.03.05.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 0.83 381.34 316.51 316.51
02.03.03.05.02 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO M2 4.15 26.40 109.56 109.56
02.03.03.05.03 LOSAS MACIZAS, ACERO fy=4200 kg/cm2 KG 317.92 4.23 1,344.80 1,344.80
02.03.03.06 ESCALERAS
02.03.03.06.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 5.29 381.34 2,017.29 2,017.29
02.03.03.06.02 ESCALERAS, ENCOFRADO Y DESENCOFRADO M2 29.75 21.70 645.58 645.58
02.03.03.06.03 ESCALERAS, ACERO fy=4200 kg/cm2 KG 472.80 4.23 1,999.94 1,999.94
02.03.03.07 VARIOS
02.03.03.07.01 JUNTA SISMICA EN MUROS E=1" M 100.00 4.52 452.00 452.00
02.03.04 SEGUNDO NIVEL
02.03.04.01 COLUMNAS Y PLACAS
02.03.04.01.01 COLUMNAS, CONCRETO 210 KG/CM2 M3 14.38 375.42 5,398.54 5,398.54
02.03.04.01.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 212.10 29.52 6,261.19 6,261.19
02.03.04.01.03 COLUMNAS, ACERO fy=4200 kg/cm2 KG 3,025.00 4.32 13,068.00 13,068.00
02.03.04.02 VIGAS
02.03.04.02.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 17.29 381.34 6,593.37 6,593.37
02.03.04.02.02 VIGAS, ENCOFRADO Y DESENCOFRADO M2 134.34 33.17 4,456.06 4,456.06
02.03.04.02.03 VIGAS, ACERO fy=4200 kg/cm2 KG 3,346.51 4.23 14,155.74 14,155.74
02.03.04.03 LOSA ALIGERADA H=20CM
02.03.04.03.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 6.71 381.34 2,558.79 2,558.79

Página 23 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias
02.03.04.03.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 33.53 20.03 671.61 671.61
02.03.04.03.03 LOSA ALIGERADA, LADR. HUECO 15x30x30 UND 520.08 3.14 1,633.05 1,633.05
02.03.04.03.04 LOSA ALIGERADA, ACERO fy=4200 kg/cm2 KG 289.09 4.23 1,222.85 1,222.85
02.03.04.04 LOSA ALIGERADA H=25CM
02.03.04.04.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 22.74 381.34 8,671.67 8,671.67
02.03.04.04.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 90.94 20.03 1,821.53 1,821.53
02.03.04.04.03 LOSA ALIGERADA, LADR. HUECO 20x30x30 UND 757.83 4.43 3,357.19 3,357.19
02.03.04.04.04 LOSA ALIGERADA, ACERO fy=4200 kg/cm2 KG 421.44 4.23 1,782.69 1,782.69
02.03.04.05 LOSA MACISA
02.03.04.05.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 5.51 381.34 2,101.18 2,101.18
02.03.04.05.02 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO M2 27.54 26.40 727.06 727.06
02.03.04.05.03 LOSAS MACIZAS, ACERO fy=4200 kg/cm2 KG 629.97 4.23 2,664.77 2,664.77
02.03.05 TERCER NIVEL
02.03.05.01 COLUMNAS Y PLACAS
02.03.05.01.01 COLUMNAS, CONCRETO 210 KG/CM2 M3 2.03 375.42 762.10 762.10
02.03.05.01.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 36.72 29.52 1,083.97 1,083.97
02.03.05.01.03 COLUMNAS, ACERO fy=4200 kg/cm2 KG 434.00 4.32 1,874.88 1,874.88
02.03.05.02 VIGAS
02.03.05.02.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 0.35 381.34 133.47 133.47
02.03.05.02.02 VIGAS, ENCOFRADO Y DESENCOFRADO M2 2.14 33.17 70.98 70.98
02.03.05.02.03 VIGAS, ACERO fy=4200 kg/cm2 KG 125.00 4.23 528.75 528.75
02.03.05.03 LOSA MACISA
02.03.05.03.01 CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 1.60 381.34 610.14 610.14
02.03.05.03.02 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO M2 8.40 26.40 221.76 221.76
02.03.05.03.03 LOSAS MACIZAS, ACERO fy=4200 kg/cm2 KG 203.00 4.23 858.69 858.69
02.03.06 VARIOS
02.03.06.01 JUNTA SISMICA EN MUROS E=1" M 200.00 4.52 904.00 904.00
03 ARQUITECTURA
03.01 PRIMER NIVEL
03.01.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01.01 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*) M2 165.00 61.01 10,066.65 10,066.65

Página 24 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias
03.01.01.02 MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 CM (*) M2 32.15 88.83 2,855.88 2,855.88
03.01.02 REVOQUES Y REVESTIMIENTOS
03.01.02.01 TARRAJEO EN MUROS EXTERIORES M2 200.00 25.16 5,032.00 5,032.00
03.01.02.02 TARRAJEO EN MUROS INTERIORES M2 400.00 15.37 6,148.00 6,148.00
03.01.02.03 TARRAJEO DE SUPERFICIE VIGAS PERALTADAS M2 78.74 25.13 1,978.74 1,978.74
03.01.02.04 TARRAJEO PRIMARIO, MORTERO C:A 1:5 M2 149.95 12.89 1,932.86 1,932.86
03.01.03 CIELORRASOS
03.01.03.01 CIELO RASO CON MEZCLA C:A 1:5 M2 168.74 20.68 3,489.54 3,489.54
03.01.03.02 VESTIDURA EN FONDO DE ESCALERAS M2 29.75 23.47 698.23 698.23
03.01.04 PISOS Y PAVIMENTOS
03.01.04.01 CONTRAPISO DE 48 mm M2 180.00 21.10 3,798.00 3,798.00
03.01.04.02 VEREDAS DE CONCRETO 175 kg/cm2 e=4", FROT. Y BRUÑADO M2 14.40 43.93 632.59 632.59
03.02 SEGUNDO NIVEL
03.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.02.01.01 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*) M2 157.97 61.01 9,637.75 9,637.75
03.02.01.02 MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 CM (*) M2 22.02 88.83 1,956.04 1,956.04
03.02.02 REVOQUES Y REVESTIMIENTOS
03.02.02.01 TARRAJEO EN MUROS EXTERIORES M2 200.00 25.16 5,032.00 5,032.00
03.02.02.02 TARRAJEO EN MUROS INTERIORES M2 400.00 15.37 6,148.00 6,148.00
03.02.02.03 TARRAJEO DE SUPERFICIE VIGAS PERALTADAS M2 134.34 25.13 3,375.96 3,375.96
03.02.02.04 TARRAJEO PRIMARIO, MORTERO C:A 1:5 M2 38.95 12.89 502.07 502.07
03.02.03 CIELORRASOS
03.02.03.01 CIELO RASO CON MEZCLA C:A 1:5 M2 169.00 20.68 3,494.92 3,494.92
03.02.04 PISOS Y PAVIMENTOS
03.02.04.01 CONTRAPISO DE 48 mm M2 180.00 21.10 3,798.00 3,798.00
03.03 TERCER NIVEL
03.03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.03.01.01 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*) M2 30.82 61.01 1,880.33 1,880.33
03.03.01.02 MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 CM (*) M2 11.64 88.83 1,033.98 1,033.98
03.03.02 REVOQUES Y REVESTIMIENTOS
03.03.02.01 TARRAJEO EN MUROS EXTERIORES M2 70.11 25.16 1,763.97 1,763.97

Página 25 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias
03.03.02.02 TARRAJEO EN MUROS INTERIORES M2 130.00 15.37 1,998.10 1,998.10
03.03.03 PISOS Y PAVIMENTOS
03.03.03.01 CONTRAPISO DE 48 mm M2 29.61 21.10 624.77 624.77
03.04 PINTURA
03.04.01 PINTURA LATEX EN CIELO RASO M2 501.14 8.03 4,024.15 4,024.15
03.04.02 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA M2 1,400.00 7.52 10,528.00 10,528.00
03.05 CUBIERTAS
03.05.01 ENCHAPE CON LADRILLO PASTELERO M2 210.00 59.31 12,455.10 12,455.10
04 INSTALACIONES SANITARIAS
04.01 SISTEMA DE AGUA FRIA
04.01.01 SALIDA DE AGUA FRIA. - PVC PTO 18.00 39.91 718.38 718.38
04.01.02 TUBERIA PVC CLASE 10 - 1 1/2" M 6.30 17.64 111.13 111.13
04.01.03 TUBERIA PVC CLASE 10 - 1" M 42.35 12.67 536.57 536.57
04.01.04 TUBERIA PVC CLASE 10 - 3/4" M 24.01 10.92 262.19 262.19
04.01.05 TUBERIA PVC CLASE 10 - 1/2" M 52.56 9.96 523.50 523.50
04.01.06 VALVULA DE COMPUERTA DE BRONCE 1/2" UND 12.00 27.37 328.44 328.44
04.01.07 VALVULA DE COMPUERTA DE BRONCE 3/4" UND 2.00 35.77 71.54 71.54
04.01.08 VALVULA DE COMPUERTA DE BRONCE 1" UND 1.00 58.93 58.93 58.93
04.01.09 VALVULA DE COMPUERTA DE BRONCE 1 1/2" UND 1.00 92.33 92.33 92.33
04.01.10 LLAVE DE RIEGO C/GRIFO DE 1/2" PZA 4.00 28.42 113.68 113.68
04.02 SISTEMA DE AGUA CALIENTE
04.02.01 SALIDA DE AGUA CALIENTE - H-3 PTO 21.00 63.23 1,327.83 1,327.83
04.02.02 TUBERIA H-3 1/2" M 25.01 13.99 349.89 349.89
04.02.03 TUBERIA H-3 3/4" M 28.97 18.33 531.02 531.02
04.02.04 VALVULA DE COMPUERTA DE BRONCE 1/2" UND 7.00 27.37 191.59 191.59
04.02.05 VALVULA DE COMPUERTA DE BRONCE 3/4" UND 2.00 35.77 71.54 71.54
04.03 SISTEMA DE DRENAJE PLUVIAL
04.03.01 TUBERIA DE BAJADA PVC-SAL 3" P/LLUVIAS M 20.40 11.39 232.36 232.36
04.04 DESAGÜE Y VENTILACION
04.04.01 SALIDA DE DESAGUE EN PVC 2" PTO 10.00 19.44 194.40 194.40
04.04.02 SALIDA DE DESAGUE EN PVC 4" PTO 4.00 35.50 142.00 142.00

Página 26 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias
04.04.03 SALIDA PARA VENTILACION PTO 4.00 17.39 69.56 69.56
04.04.04 TUBERIA PVC-SAL 2" M 60.71 16.06 975.00 975.00
04.04.05 TUBERIA PVC-SAL 4" M 116.83 19.24 2,247.81 2,247.81
04.04.06 YEE PVC SAL 2" UND 6.00 3.42 20.52 20.52
04.04.07 YEE PVC SAL 4" UND 18.00 8.67 156.06 156.06
04.04.08 TRAMPA P PVC 2" UND 15.00 27.17 407.55 407.55
04.04.09 SOMBRERO PARA VENTILACION DE PVC DE 2" UND 4.00 5.00 20.00 20.00
04.04.10 CAJA DE REGISTRO UND 4.00 108.77 435.08 435.08
05 INSTALACIONES ELECTRICAS Y MECANICAS
05.01 SALIDA PARA LUZ, TOMACORRIENTES Y CAJAS
05.01.01 SALIDA DE TECHO (CENTRO DE LUZ) PTO 68.00 15.69 1,066.92 1,066.92
05.01.02 SALIDA DE PARED (BRAQUETES) PTO 32.00 13.99 447.68 447.68
05.01.03 SALIDA DE PISO PTO 10.00 13.99 139.90 139.90
05.01.04 CAJA DE PASE PVC 100x100x50 mm UND 6.00 23.99 143.94 143.94
05.01.05 SALIDA INTERRUPTOR SIMPLE PTO 16.00 13.57 217.12 217.12
05.01.06 SALIDA INTERRUPTOR DOBLE PTO 7.00 14.17 99.19 99.19
05.01.07 SALIDA INTERRUPTOR CONMUTACION DOBLE PTO 15.00 14.17 212.55 212.55
05.01.08 SALIDA INTERRUPTOR TRIPLE PTO 1.00 14.17 14.17 14.17
05.01.09 SALIDA TOMACORRIENTE DOBLE CON PUESTA A TIERRA PTO 47.00 14.46 679.62 679.62
05.01.10 SALIDA DE FUERZA PTO 2.00 13.97 27.94 27.94
05.01.11 SALIDA DE FUERZA PARA COCINA PTO 2.00 13.97 27.94 27.94
05.02 CABLEADO
05.02.01 CABLEADO SALIDAS DE ACOMETIDAS A TABLEROS PTO 4.00 132.37 529.48 529.48
05.02.02 CABLEADO SALIDAS DE TOMACORRIENTES PTO 51.00 64.28 3,278.28 3,278.28
05.02.03 CABLEADO SALIDAS DE ILUMINACION PTO 110.00 76.08 8,368.80 8,368.80
05.03 CANALIZACIONES Y/O TUBERIAS
05.03.01 TUBERIA PVC (ELECTRICAS) D=20 mm M 77.27 4.09 316.03 316.03
05.03.02 TUBERIA PVC (ELECTRICAS) D=25 mm M 503.45 3.70 1,862.77 1,862.77
05.04 TABLEROS DE DISTRIBUCION
05.04.01 TABLERO DE DISTRIBUCION PZA 2.00 118.63 237.26 237.26
05.05 SISTEMA DE PUESTA A TIERRA

Página 27 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias
05.05.01 SISTEMA DE PUESTA A TIERRA (SISTEMA ESTABILIZADO GENERAL) JGO 3.00 1,224.50 3,673.50 3,673.50
06 INSTALACIONES DE COMUNICACIONES
06.01 SALIDA DE TELEFONIA Y DATA PTO 17.00 16.40 278.80 278.80
06.02 SALIDA PARA INTERCOMUNICADOR PTO 4.00 17.07 68.28 68.28
06.03 CAJA DE PASE PVC 100x100x50 mm UND 12.00 23.99 287.88 287.88
06.04 CANALIZACIONES Y/O TUBERIAS
06.04.01 TUBERIA PVC (ELECTRICAS) D=20 mm M 77.27 4.09 316.03 316.03
06.04.02 TUBERIA PVC (ELECTRICAS) D=25 mm M 503.45 3.70 1,862.77 1,862.77
07 CERCO PERIMETRICO
07.01 MOVIMIENTO DE TIERRAS
07.01.01 EXCAVACIONES
07.01.01.01 EXCAVACION PARA SUBZAPATA ZAPATAS Y CIMIENTOS M3 33.86 22.96 777.43 777.43
07.01.01.02 ELIMINACION MATERIAL EXCEDENTE C/MAQUINA M3 42.32 16.24 687.28 687.28
07.02 OBRAS DE CONCRETO SIMPLE
07.02.01 SUBZAPATAS: CONCRETO 1:12 + 30% P.M. (INCLU GASOLINA Y ACEITE) M3 4.84 177.43 858.76 858.76
07.02.02 CIMIENTOS CORRIDOS: CONCRETO 1:10 + 30% P.M. (INCLU GASOLINA Y ACEITE) M3 21.77 177.43 3,862.65 3,862.65
07.02.03 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.15 MT M3 5.22 255.65 1,334.49 1,334.49
07.02.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 mt. M2 69.62 22.82 1,588.73 1,588.73
07.03 OBRAS DE CONCRETO ARMADO
07.03.01 COLUMNAS, CONCRETO 210 KG/CM2 M3 2.24 375.42 840.94 840.94
07.03.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 46.46 29.52 1,371.50 1,371.50
07.03.03 COLUMNAS, ACERO fy=4200 kg/cm2 KG 300.00 4.32 1,296.00 1,296.00
08 MUROS Y TABIQUES DE ALBAÑILERIA
08.01 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*) M2 107.25 61.01 6,543.32 6,543.32
09 REVOQUES Y REVESTIMIENTOS
09.01 TARRAJEO EN MUROS INTERIORES M2 137.30 15.37 2,110.30 2,110.30

COSTO DIRECTO 374,207.99 374,207.99


GASTOS GENERALES 6% 22,452.48 22,452.48
UTILIDAD 5% 18,710.40 18,710.40
PRESUPUESTO TOTAL 415,370.87 415,370.87

Página 28 de 106
SPECTRA INGENIERIA ESTRUCTURAL DISEÑA, SUPERVISA Y CONSTRUYE

Calendario Valorizado de Avance de Obra


Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA : SR.JORGE
CHAVEZ Y
SRA. MIRNA
Costo A : Jul - 2020 Cliente
OJEDA_x000D
_

Precio TOTAL
Item Descripcion Unid Metrado Parcial
Unitario 121 Dias
TOTAL ACUMULADO
PORCENTAJE DE AVANCE
PORCENTAJE ACUMULADO

Página 29 de 106
PLANILLA DE METRADOS "ZAPATAS"

PROYECTO : VIVIENDA UNIFAMILIAR MULTIPLICAR POR PARA KG/ML


FECHA : 9/1/2020 TIPO 1 2 3 4 5 6

A CARGO : f 1/4" 3/8" 1/2" 5/8" 3/4" 1"


UBICACIÓN : SACHACA - AREQUIPA - AREQUIPA w /m 0.249 0.56 0.994 1.552 2.235 3.973
REVISADO : HOJA : ACERO 01 % DESP. 2% 3% 5% 7% 8% 10%

Nro Nro LONG. FIERRO (Kg) PARCIAL PARCIAL


ITEM - DESCRIPCION TIPO f ml
VECES PIEZA PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
ACERO PARA ZAPATAS Z-1 (1.30 x1.50) (P4)
4 5/8" 1 7 1.30 14.12 14.1 9.1
1.50

4 5/8" 1 8 1.50 18.62 18.6 12

1.30

ACERO PARA ZAPATAS Z-2 (1.45 x 1.25) (P5)


4 5/8" 1 7 1.45 15.75 15.8 10.15
1.25

4 5/8" 1 6 1.25 11.64 11.6 7.5

1.45

ACERO PARA ZAPATAS Z-3 (2.03 x 1.25) (P7)


4 5/8" 1 10 2.03 31.51 31.5 20.3
1.25

4 5/8" 1 6 1.25 11.64 11.6 7.5

2.03

ACERO PARA ZAPATAS Z-4 (1.65 x1.25) (P8)


4 5/8" 1 8 1.65 20.49 20.5 13.2
1.25

4 5/8" 1 6 1.25 11.64 11.6 7.5

1.65

ACERO PARA ZAPATAS Z-5 (1.65 x 1.05) (P17)


4 5/8" 1 8 1.65 20.49 20.5 13.2
1.06

4 5/8" 1 5 1.06 8.226 8.2 5.3

1.65

ACERO PARA ZAPATAS Z-6 (1.20 x1.05) (P9)


4 5/8" 1 6 1.20 11.17 11.2 7.2
1.05

4 5/8" 1 5 1.05 8.148 8.1 5.25

1.20

ACERO PARA ZAPATAS Z-7 (1.55 x1.25) (P20)


4 5/8" 2 8 1.55 38.49 38.5 24.8
1.25

4 5/8" 2 6 1.25 23.28 23.3 15

1.55

ACERO PARA ZAPATAS Z-8 (1.05 x1.05) (P12)


4 5/8" 1 5 1.05 8.148 8.1 5.25
1.05

4 5/8" 1 5 1.05 8.148 8.1 5.25

1.05

RESUMEN DE METRADO POR ø DE ACERO 1/4" 3/8" 1/2|" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 0 0 0 261.5 0 0 261.51
TOTAL (KG/ACERO) + DESPERDICIO 0 0 0 279.8 0 0
279.82
ACERO EN VARILLAS (VAR) 0 0 0 20.03 0 0
3.8

PLANILLA DE METRADOS "VIGAS DE CIMENTACIÓN"


PROYECTO : VIVIENDA UNIFAMILIAR
FECHA 9/1/2020 MULTIPLICAR POR PARA KG/ML
A CARGO : TIPO 1 2 3 4 5 6
UBICACIÓN : SACHACA - AREQUIPA - AREQUIPA f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
REVISADO : HOJA : ACERO 02 w /m 0.249 0.56 0.994 1.552 2.235 3.973
% DESP. 2% 3% 5% 7% 8% 10%

TIP Nro Nro LONG. FIERRO (Kg) PARCIAL


ITEM - DESCRIPCION
O f
VECES PIEZA PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
VIGA DE CIMENTACION EJE A-A, (0.25x0.50)
0.25
3.49 (+) 0.25 4 5/8" 1 3 3.99 18.577 18.6
4 5/8" 1 3 3.99 18.577 18.6
3.49 (-)
0.25 0.25

0.22 13 cm ø 1/2"

TRASLP 0.13 13 cm ø 3/8" 2 3/8" 1 31 1.54 26.734 26.7


13 cm. Ø1/ 2"
10cm. Ø 3/ 8"
7.5cm. Ø 1/4"
0.42

0 8 cm ø 1/4"

VIGA DE CIMENTACION EJE 2-2 (0.25 x 0.50)


0.25
5.16 (+) 0.25 4 5/8" 1 3 5.66 26.353 26.4
4 5/8" 1 3 5.66 26.353 26.4
0.25
5.16 (-) 0.25

0.22 13 cm ø 1/2"

TRASLP 0.13 13 cm ø 3/8" 2 3/8" 1 38 1.54 32.771 32.8


13 cm. Ø1/ 2"
10cm. Ø 3/ 8"
7.5cm. Ø 1/4"
0.42

0 8 cm ø 1/4"

VIGA DE CIMENTACION EJE 4-4 (0.25x0.50)


0.25
3.31 (+) 0.25 4 5/8" 1 3 3.81 17.739 17.7
4 5/8" 1 3 3.81 17.739 17.7
0.25
3.31 (-) 0.25

0.22 13 cm ø 1/2"

TRASLP 0.13 13 cm ø 3/8" 2 3/8" 1 31 1.54 26.734 26.7


13 cm. Ø1/ 2"
10cm. Ø 3/ 8"
7.5cm. Ø 1/4"
0.42

0 8 cm ø 1/4"

VIGA DE CIMENTACION EJE 8-8 (0.25x0.50)


2.56 (+)
0.25 0.25 4 5/8" 1 3 3.06 14.247 14.2
4 5/8" 1 3 3.06 14.247 14.2
0.25
2.56 (-) 0.25

0.22 13 cm ø 1/2"

TRASLP 0.13 13 cm ø 3/8" 2 3/8" 1 23 1.54 19.835 19.8


13 cm. Ø1/ 2"
10cm. Ø 3/ 8"
0.42

7.5cm. Ø 1/4"

0 8 cm ø 1/4"

RESUMEN DE METRADO POR ø DE ACERO 1/4" 3/8" 1/2" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 0 106.08 0 153.83 0 0 259.90944
TOTAL (KG/ACERO) + DESPERDICIO 0 109.26 0 164.6 0 0
273.86009
ACERO EN VARILLAS (VAR) 0.0 21.7 0.0 11.8 0.0 0.0
PLANILLA DE METRADOS
PROYECTO : VIVIENDA UNIFAMILIAR
FECHA 9/1/2020 MULTIPLICAR POR PARA KG/ML
A CARGO : TIPO 1 2 3 4 5 6 0
UBICACIÓN : SACHACA - AREQUIPA - AREQUIPA f 1/4" 3/8" 1/2" 5/8" 3/4" 1" 6 mm
REVISADO : HOJA : ACERO 03 w /m 0.249 0.560 0.994 1.552 2.235 3.973 0.222
d % DESP. 2% 3% 5% 7% 8% 10% 2%

TIP Nro Nro LONG. FIERRO (Kg) PARCIAL


ITEM - DESCRIPCION
O f
VECES PIEZA PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" 6 mm kg
P-1 NIVEL 1 (0.25 x 0.30)
COLUMNA P-1 (25x30) 3 1/2" 2 6 4.32 51.529 51.5
0.17 0.08
16 cm ø 1/2"
4.07

1 3 cm . Ø1/2 "
1 0cm. Ø3/8 "
7. 5cm. Ø 1/ 4"
0.22

13 cm ø 3/8" ESTRIBO 0 6 mm 2 21 0.94 8.7646 8.8


8 cm ø 1/4"

0.25

P-2 NIVEL 1 (0.25 x 0.45)(0.50 x .20)


0.25 0.25 COLUMNA P-2 (25x45)(50x20) 4 5/8" 1 8 4.57 56.741 56.7
0.37 0.13 3 1/2" 1 6 4.57 27.255 27.3
16 cm ø 1/2"
4.07

4.07

0.17
1 3 cm. Ø1 /2 "

7 .5 cm. Ø 1/4"
10 cm. Ø 3/ 8"

13 cm ø 3/8" ESTRIBO 2 3/8" 1 14 1.34 10.506 10.5


0.12 8 cm ø 1/4" 2 3/8" 1 14 1.34 10.506 10.5
0.25 0.25
0.42

1 3 cm . Ø1/ 2"
1 0cm . Ø 3/ 8"
7 .5 c
m . Ø 1/ 4"

P-3 NIVEL 1 (0.20 x 0.25)


0.25 0.25 COLUMNA P-3 (20x25) 3 1/2" 1 2 4.57 9.09 9.1
0.12 0.16 3 1/2" 1 2 4.57 9.09 9.1
16 cm ø 1/2"
4.07

4.07

13 cm . Ø 1/2"
10cm . Ø 3/8"
0.17

7. 5cm. Ø1/ 4"

13 cm ø 3/8" ESTRIBO 3 1/2" 2 27 0.90 48.308 48.3


8 cm ø 1/4"

0.25 0.25

P-6 NIVEL 1 (0.33 x 0.33)


0.25 0.25 COLUMNA P-6 (33x33) 3 1/2" 1 4 4.57 18.17 18.2
0.25 0.08 3 1/2" 1 4 4.57 18.17 18.2
16 cm ø 1/2"
4.07

4.07

13 cm . Ø 1/2"
10cm . Ø 3/8"
0.25

7. 5cm. Ø1/ 4"

13 cm ø 3/8" ESTRIBO 0 6 mm 1 27 1.16 6.95 7.0


8 cm ø 1/4"

0.25 0.25

P-7 NIVEL 1 (0.25 x 1.00)


COLUMNA P-7 (25x100) 4 5/8" 1 14 4.32 93.865 93.9
0.92 0.13
16 cm ø 1/2"
4.07

4.07

0.17
13 c m. Ø1/ 2"
10c m. Ø 3 /8 "
7. 5cm. Ø 1/ 4"

13 cm ø 3/8" ESTRIBO 2 3/8" 1 28 2.44 38.259 38.3


8 cm ø 1/4"

0.25 0.25

P-4 NIVEL 1 (0.30 x 0.50)


0.25 0.25 COLUMNA P-4 (30x50) 4 5/8" 1 8 4.57 56.741 56.7
0.42 0.13
16 cm ø 1/2"
4.07

4.07

0.22

2 3/8" 1 28 1.54 24.147 24.1


13 c m. Ø1/ 2"
10c m. Ø 3 /8 "
7. 5cm. Ø 1/ 4"

13 cm ø 3/8" ESTRIBO

8 cm ø 1/4"

0.25 0.25

P-5 NIVEL 1 (0.25 x 0.45)


0.25 0.25 COLUMNA P-5 (25x45) 4 5/8" 1 6 4.57 42.556 42.6
0.17 0.13
16 cm ø 1/2"
4.07

4.07

0.37

13 cm. Ø1/2"
10c m . Ø 3/8"
7.5 cm. Ø 1/4 "

13 cm ø 3/8" ESTRIBO 2 3/8" 1 28 1.34 21.011 21.0


8 cm ø 1/4"

0.25 0.25

P-26 NIVEL 1 (0.15 x 0.25)


0.25 COLUMNA P-26 (15x25) 2 3/8" 16 4 3.05 109.31 109.3
0.07 0.08
16 cm ø 1/2"
2.55

0.17
7. 5c m. Ø 1 /4 "
1 3 cm. Ø1/ 2"
1 0cm. Ø 3/ 8"

13 cm ø 3/8" ESTRIBO 0 6 mm 16 19 0.64 43.19 43.2


8 cm ø 1/4"

0.25

P-25 NIVEL 1 (0.25 x 0.25)


0.25 COLUMNA P-25 (25x25) 2 3/8" 16 4 3.05 109.31 109.3
0.17 0.08
16 cm ø 1/2"
2.55

0.17
1 3 cm. Ø1/2"
1 0cm. Ø 3/8"
7. 5c m. Ø 1 /4 "

13 cm ø 3/8" ESTRIBO 0 6 mm 16 19 0.84 56.69 56.7


8 cm ø 1/4"

0.25

P-10 NIVEL 1 (0.15 x 0.40)


0.25 COLUMNA P-25 (25x25) 4 5/8" 16 4 3.05 302.95 303.0
0.32 0.13 2 3/8" 1 2 3.05 3.416 3.4
16 cm ø 1/2"
2.55

12.5
7.5c m. Ø 1 /4 "
1 3 cm. Ø1/ 2"
1 0cm. Ø 3/ 8"

13 cm ø 3/8" ESTRIBO 2 3/8" 16 19 25.90 4409.2 4409.2


8 cm ø 1/4"

0.25
1/4" 3/8" 1/2" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 0 21.011 78.784 56.741 0 8.7646 5585.7
TOTAL (KG/ACERO) + DESPERDICIO 0 21.642 82.724 60.713 0 9.641
174.7192
ACERO EN VARILLAS (VAR) ø=1/4 en Kg 0 4.3 9.2 4.3 0 0.2696
PLANILLA DE METRADOS
PROYECTO : VIVIENDA UNIFAMILIAR
FECHA 9/1/2020 MULTIPLICAR POR PARA KG/ML
A CARGO : TIPO 1 2 3 4 5 6
UBICACIÓN : SACHACA - AREQUIPA - AREQUIPA f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
REVISADO : HOJA : ACERO 04 w /m 0.249 0.560 0.994 1.552 2.235 3.973
% DESP. 2% 3% 5% 7% 8% 10%

TIP Nro Nro LONG. FIERRO (Kg) PARCIAL


ITEM - DESCRIPCION
O f
VECES PIEZA PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg

VIGA V-23 (0.25x0.40) Eje A-A, 1-8


16.48 (-) 4 5/8" 1 3 16.98 79.0589 79.1
0.25

0.25

(+) 4 5/8" 1 3 16.98 79.0589 79.1


16.48

0.00 0.00 (-) 4 5/8" 8 2 0.00 0 0.0


0

0.00

(+) 3 1/2" 8 2 0.00 0 0.0


0.00
0.21 0.1 13 cm ø 1/2" ESTRIBO 2 3/8" 1 86 1.34 64.5344 64.5
13 cm. Ø 1 /2"

TRASLP
10 cm . Ø 3 /8"
7 .5c m. Ø 1/4 "

10 cm ø 3/8"
0.36

0 7.5 cm ø 1/4"

VIGA V-15 (0.25x0.40) Eje A-F, 8-8


10.15 (-) 3 1/2" 1 2 10.65 21.1722 21.2
0.25

0.25

(+) 3 1/2" 1 2 10.65 21.1722 21.2


10.15

0.00 0.00 0.00 (-) 4 5/8" 4 2 0.00 0 0.0


0

0.00

(+) 4 5/8" 4 2 0.00 0 0.0


0.00

0.21 0.1 13 cm ø 1/2" ESTRIBO 1 1/4" 4 75 1.34 100.1 100.1


13 cm. Ø 1 /2"

TRASLP
10 cm . Ø 3 /8"
7 .5c m. Ø 1/4 "

10 cm ø 3/8"
0.36

0 7.5 cm ø 1/4"

VIGA V-14(0.15x0.40) Eje D-F, 8-8


4.48 (-) 3 1/2" 1 2 4.98 9.90024 9.9
0.25

0.25

(+) 3 1/2" 1 2 4.98 9.90024 9.9


4.48

0.11 0.1 13 cm ø 1/2" ESTRIBO 1 1/4" 2 38 1.14 21.573 21.6


13 cm. Ø 1 /2"

TRASLP
10 cm . Ø 3 /8"
7 .5c m. Ø 1/4 "

10 cm ø 3/8"
0.36

0 7.5 cm ø 1/4"

VIGA V-27 (0.25x0.40) Eje F-F, 4-8


8.70 (-) 4 5/8" 1 2 9.20 28.5568 28.6
0.25

0.25

(+) 4 5/8" 1 2 9.20 28.5568 28.6


8.70

0.21 0.1 13 cm ø 1/2" ESTRIBO 1 1/4" 6 65 1.34 130.13 130.1


13 cm. Ø 1 /2"

TRASLP
10 cm . Ø 3 /8"
7 .5c m. Ø 1/4 "

10 cm ø 3/8"
0.36

0 7.5 cm ø 1/4"

VIGA V-26 (0.15x0.40) Eje E-E, 3-4


4.55 (-) 3 1/2" 1 2 5.05 10.0394 10.0
0.25

0.25

(+) 3 1/2" 1 2 5.05 10.0394 10.0


4.55

0.11 0.075 13 cm ø 1/2" ESTRIBO 1 1/4" 1 37 1.09 10.042 10.0


13 cm. Ø 1 /2"

TRASLP
10 cm . Ø 3 /8"
7 .5c m. Ø 1/4 "

10 cm ø 3/8"
0.36

0 7.5 cm ø 1/4"

VIGA SOLERA-12 (0.15x0.40) Eje F-F, 2-3


4.33 (-) 3 1/2" 1 2 4.83 9.60204 9.6
0.25

0.25

(+) 3 1/2" 1 2 4.83 9.60204 9.6


4.33

0.11 0.075 13 cm ø 1/2" ESTRIBO 1 1/4" 3 36 1.09 29.312 29.3


13 cm. Ø 1 /2"

TRASLP
10 cm . Ø 3 /8"
7 .5c m. Ø 1/4 "

10 cm ø 3/8"
0.36

0 7.5 cm ø 1/4"

VIGA V-22- (0.25x0.40) Eje A-F, 2-2


10.25 (-) 3 1/2" 1 2 10.75 21.371 21.4
0.25

0.25

(+) 3 1/2" 1 2 10.75 21.371 21.4


10.25

0.21 0.1 13 cm ø 1/2" ESTRIBO 1 1/4" 1 75 1.34 25.025 25.0


13 cm. Ø 1 /2"

TRASLP
10 cm . Ø 3 /8"
7 .5c m. Ø 1/4 "

10 cm ø 3/8"
0.36

0 7.5 cm ø 1/4"

VIGA CH- (0.20x0.17) Eje


0.00 (-) 3 1/2" 3 2 0.00 0 0.0
0.00

0.00

(+) 3 1/2" 3 2 0.00 0 0.0


0.00

0 0 13 cm ø 1/2" ESTRIBO 1 1/4" 3 39 0.00 0 0.0


13 cm. Ø 1 /2"

TRASLP
10 cm . Ø 3 /8"
7 .5c m. Ø 1/4 "

10 cm ø 3/8"
0

0 7.5 cm ø 1/4"

RESUMEN DE METRADO POR ø DE ACERO 1/4" 3/8" 1/2" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 316.18 64.5344 144.17 215.231 0 0 740.11
TOTAL (KG/ACERO) + DESPERDICIO 322.50 66.4704 151.378 230.298 0 0 770.65

ACERO EN VARILLAS (VAR) 143.33 13.2 16.9 16.5 0.0 0 189.93


PLANILLA DE METRADOS
PROYECTO : VIVIENDA UNIFAMILIAR
FECHA 9/1/2020 MULTIPLICAR POR PARA KG/ML
A CARGO : TIPO 1 2 3 4 5 6 HOJA
UBICACIÓN : SACHACA - AREQUIPA - AREQUIPA f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
REVISADO : HOJA : ACERO 05 w /m 0.249 0.560 0.994 1.552 2.235 3.973
% DESP. 2% 3% 5% 7% 8% 10%

TIP Nro Nro LONG. FIERRO (Kg) PARCIAL


ITEM - DESCRIPCION
O f
VECES PIEZA PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg

ALIGERADO AREA 1
0.50 0.00 0.50 - 2 3/8" 1 2 1.00 1.12 1.1
3 1/2" 1 3 2.67 7.9619 8.0
+

2.67 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 8 1 2.67 5.31864 5.3
Traslape 1 1/4" 1 2.373 0.25 0.14774 0.1
ALIGERADO AREA 2
0.75 0.00 0.75 - 2 3/8" 1 4 1.50 3.36 3.4
3 1/2" 1 4 2.53 10.059 10.1
+

2.53 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 10 1 2.53 6.2997 6.3
Traslape 1 1/4" 1 2.811 0.25 0.17499 0.2
ALIGERADO AREA 3
1.00 0.00 1.00 - 2 3/8" 1 7 2.00 7.84 7.8
3 1/2" 1 7 2.34 16.282 16.3
+

2.34 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 16 1 2.34 9.32256 9.3
Traslape 1 1/4" 1 4.16 0.25 0.25896 0.3
ALIGERADO AREA 4
1.00 0.00 1.00 - 2 3/8" 1 4 2.00 4.48 4.5
3 1/2" 1 4 5.05 20.079 20.1
+

5.05 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 10 1 5.05 12.5745 12.6
Traslape 1 1/4" 1 5.611 0.25 0.34929 0.3
ALIGERADO AREA 5
0.75 0.00 0.75 - 2 3/8" 1 7 1.50 5.88 5.9
3 1/2" 1 7 3.53 24.562 24.6
+

3.53 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 16 1 3.53 14.0635 14.1
Traslape 1 1/4" 1 6.276 0.25 0.39065 0.4
ALIGERADO AREA 6
1.10 0.00 1.10 - 3 1/2" 1 9 2.20 19.681 19.7
3 1/2" 1 9 5.50 49.203 49.2
+

5.50 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 18 1 5.50 24.651 24.7
Traslape 1 1/4" 1 11 0.25 0.68475 0.7
ALIGERADO AREA 7
0.75 0.00 0.75 - 2 3/8" 1 7 1.50 5.88 5.9
3 1/2" 1 7 3.90 27.136 27.1
+

3.90 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 16 1 3.90 15.5376 15.5
Traslape 1 1/4" 1 6.933 0.25 0.4316 0.4
ALIGERADO AREA 8
1.10 0.00 1.10 - 3 1/2" 1 3 2.20 6.5604 6.6
3 1/2" 1 3 5.50 16.401 16.4
+

5.50 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 8 1 5.50 10.956 11.0
Traslape 1 1/4" 1 4.889 0.25 0.30433 0.3
ALIGERADO AREA 9
1.10 0.00 1.10 - 3 1/2" 1 15 2.20 32.802 32.8
3 1/2" 1 15 5.50 82.005 82.0
+

5.50 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 32 1 5.50 43.824 43.8
Traslape 1 1/4" 1 19.56 0.25 1.21733 1.2
ALIGERADO AREA 10
0.80 0.00 0.80 - 2 3/8" 1 6 1.60 5.376 5.4
3 1/2" 1 6 3.90 23.26 23.3
+

3.90 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 14 1 3.90 13.5954 13.6
Traslape 1 1/4" 1 6.067 0.25 0.37765 0.4
ALIGERADO AREA 11
0.80 0.00 0.80 - 2 3/8" 1 3 1.60 2.688 2.7
3 1/2" 1 3 1.70 5.0694 5.1
+

1.70 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 8 1 1.70 3.3864 3.4
Traslape 1 1/4" 1 1.511 0.25 0.09407 0.1
ALIGERADO AREA 12
0.80 0.00 0.80 - 2 3/8" 1 3 1.60 2.688 2.7
3 1/2" 1 3 1.70 5.0694 5.1
+

1.70 traslape
Acero Temperatura 1/4"
Temperatura 1 1/4" 8 1 1.70 3.3864 3.4
Traslape 1 1/4" 1 1.511 0.25 0.09407 0.1

RESUMEN DE METRADO POR ø DE ACERO 1/4" 3/8" 1/2" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 167.441 39.312 346.13 0 0 0 552.9
TOTAL (KG/ACERO) + DESPERDICIO 170.8 40.491 363.44 0 0 0
574.72
ACERO EN VARILLAS (VAR) 69.6 8.0 40.6 0.0 0.0 0
PLANILLA DE METRADOS
PROYECTO : VIVIENDA UNIFAMILIAR
FECHA 9/1/2020 MULTIPLICAR POR PARA KG/ML
A CARGO : TIPO 1 2 3 4 5 6
UBICACIÓN : SACHACA - AREQUIPA - AREQUIPA f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
REVISADO : HOJA : ACERO 06 w /m 0.249 0.560 0.994 1.552 2.235 3.973
% DESP. 2% 3% 5% 7% 8% 10%

TIP Nro Nro LONG. FIERRO (Kg) PARCIAL


ITEM - DESCRIPCION
O f
VECES PIEZA PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg

REFUERZO DEL PRIMER TRAMO DEL 1º PISO


"Tramo 01" 2 3/8" 1 1 4.93 2.76 2.8

2 3/8" 1 1 6.72 3.76 3.8

2 3/8" 1 1 3.10 1.74 1.7

2 3/8" 0 0 0.00 0.00 0.0

2 3/8" 2 12 1.20 16.13 16.1

"Tramo 02"
2 3/8" 1 1 7.51 4.21 4.2

2 3/8" 1 1 3.90 2.18 2.2


2 3/8" 1 1 6.00 3.10 3.1

2 3/8" 1 1 3.10 1.74 1.7


2 3/8" 2 25 1.20 33.60 33.6
"Tramo 03"

2 3/8" 1 1 7.60 4.26 4.3

2 3/8" 1 1 4.30 2.41 2.4

2 3/8" 1 1 6.70 3.75 3.8

2 3/8" 1 1 3.55 1.99 2.0

2 3/8" 2 26 2.01 58.53 58.5

REFUERZO DEL PRIMER TRAMO DEL 2°, 3°, 4°


"Tramo 01" 2 3/8" 0 6 2.85 0 0.0
2 3/8" 0 6 1.00 0 0.0

2 3/8" 0 6 1.68 0.0

2 3/8" 0 16 0.95 0 0.0

"Tramo 02"
2 3/8" 0 6 1.45 0 0.0

2 3/8" 0 2 1.00 0 0.0

"Tramo 03"

3 1/2" 0 6 4.31 0 0.0

2 3/8" 0 6 1.00 0 0.0

2 3/8" 0 6 1.61 0 0.0

2 3/8" 0 6 2.01 0 0.0

2 3/8" 0 28 2.01 0 0.0

RESUMEN DE METRADO POR ø DE ACERO 1/4" 3/8" 1/2" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 0 140.15 0 0 0 0 140.1
TOTAL (KG/ACERO) + DESPERDICIO 0.0 144.35 0 0 0 0 144.35
ACERO EN VARILLAS (VAR) 0.0 28.6 0.0 0.0 0.0 0 28.64
CÁLCULO CANTIDAD DE ESTRIBOS VIGAS Y COLUMNAS

𝑆_1@ 𝑆_2 @ 𝑆_3 @ 𝑆_4 @ Resto @ 𝑆_4 @ 𝑆_3 @ 𝑆_2 @ 𝑆_1

L= 2.325

Esp. veces
S1= 0.05 1 1.7
S2= 0.1 5 0.625 Redondear
S3= 0.15 2 3.125 4
S4= 0.20 0 3
Re= 0.20 ?
TOTAL: 19 estribos
Nº DE PARTIDA Partida DESCRIPCION Nº V.

05 MUROS Y TABIQUES DE ALBAÑILERÍA


PRIMER PISO
MURO DE LADRILLO KK - SOGA - M = 1:4
MURO DE LADRILLO KK - CABEZA - M = 1:4
(Y)
eje A - 3@4
M2 CABEZA 1.00
eje A - 6@7
M3 SOGA 1.00
eje A - 7@8
M4 SOGA 1.00
eje C - 7@8
M5 SOGA 1.00
eje D-E - 4@6
M6 SOGA 1.00
eje D - 1@2
M7 SOGA 1.00
eje D - 2@3
M8 SOGA 1.00
eje D - 6@8
M9 SOGA 1.00
eje D-E - 3´@4
M10 SOGA 1.00
eje D-E - 4@5
M11 CABEZA 1.00
eje F - 1@3
M12 SOGA 1.00
eje E - 3@3´
M13 SOGA 1.00
eje E - 3´@4
M14 SOGA 1.00
eje E - 4@6
M15 SOGA 1.00
eje E - 6@9
M16 SOGA 1.00
(X)
eje 3 de D@E
M18 SOGA 1.00
eje 3 de A@D
M19 SOGA 1.00
eje 3 de F@F´
M20 SOGA 1.00
eje 4 de A@B
M21 CABEZA 1.00
eJe 3´de D@E
M22 SOGA 1.00
eje 4 de D@E
M24 CABEZA 1.00
eje 5 de A@B
M25 SOGA 1.00
eje 6 de A@B
M26 SOGA 1.00
eje 6 de D@E
M27 SOGA 1.00
eje 6-7 de A@B
M28 SOGA 1.00
eje 7 de A@B
SOGA 1.00
eje A´ - 1@10 CERCO
M1 SOGA 1.00
eje F´ - 3@10 CERCO
M17 SOGA 1.00
1.00
1.00
SEGUNDO PISO
MURO DE LADRILLO KK - SOGA - M = 1:4
MURO DE LADRILLO KK - CABEZA - M = 1:4
(Y)
eje A - 2@3
M18 SOGA 1.00
eje A - 3@4 VENTANAS
M19 SOGA 1.00
eje A - 3@4
M20 SOGA 1.00
eje A de 4@5
M21 SOGA 1.00
eje A de 5@6
M22 SOGA 1.00
eje A de 6@7 VENTANAS
M23 SOGA 1.00
eje A de 6@8
M24 SOGA 1.00
eje A-B de 4@6
M25 SOGA 1.00
eje A-B de 6@7
M26 SOGA 1.00
5.02 eje C-D de 4@5
M27 SOGA 1.00
eje C-D de 5@6
M28 SOGA 1.00
eje C-D de 6@7
M29 SOGA 1.00
eje D de 2@3
M30 SOGA 1.00
eje D de 4@7
M31 CABEZA 1.00
eje D de 7@8
M32 CABEZA 1.00
eje D-E de 6@7
M33 SOGA 1.00
eje E de 3@3´
M34 SOGA 1.00
eje E de 3´@4
M35 SOGA 1.00
eje F de 2@3
M36 SOGA 1.00
eje F de 4@6 VENTANAS
M37 SOGA 1.00
eje F de 4@6
M38 SOGA 1.00
eje F de 6@8
SOGA 1.00
(X)
eje 2 de D@E
M18 SOGA 1.00
eje 3 de A@B
M19 SOGA 1.00
eje 3 de D@E
M20 SOGA 1.00
eje 4 de A@D
M21 CABEZA 1.00
eJe 4 de D@F
M22 CABEZA 1.00
eje 5 de A@C
M24 SOGA 1.00
eje 5-6 de A@C
M25 SOGA 1.00
eje 6-7 de A@D
M26 SOGA 1.00
eje 6-7 de D@F
M27 SOGA 1.00
eje 7 de C@D
M28 SOGA 1.00
eje 8 de C@D
SOGA 1.00
LARGO ANCHO ALTO FACTOR SUBTOTAL TOTAL TOTAL SOGA - UNIDAD
CABEZA

394.79 m2

108.79 270.20
16.47 46.08
4760 125.26 316.28 m2

3.10 - 0.60 1.00 1.86

1.55 - 1.10 1.00 1.71

2.65 - 2.55 1.00 6.76

1.50 - 2.55 1.00 3.83

1.21 - 2.55 1.00 3.09

1.15 - 2.55 1.00 2.93

3.47 - 2.55 1.00 8.85

5.45 - 2.55 1.00 13.90

0.50 - 2.55 1.00 1.28

1.33 - 2.55 1.00 3.39

3.78 - 2.55 1.00 9.64

1.60 - 0.60 1.00 0.96

1.25 - 1.70 1.00 2.13

2.05 - 0.60 1.00 1.23

4.85 - 2.55 1.00 12.37

2.10 - 2.55 1.00 5.36

4.90 - 2.55 1.00 12.50

0.58 - 2.55 1.00 1.48

0.80 - 2.55 1.00 2.04

2.35 - 2.55 1.00 5.99

3.60 - 2.55 1.00 9.18

1.40 - 2.55 1.00 3.57


0.61 - 2.55 1.00 1.56

2.75 - 2.55 1.00 7.01

0.55 - 2.55 1.00 1.40

0.50 - 2.55 1.00 1.28


78.51
20.64 - 2.55 1.00 52.63

11.25 - 2.30 1.00 25.88 931.5 4004.208


20.80 2.30 1.00 47.84 1722.24
16.31 2.30 1.00 37.51 1350.468

161.42
29.61
7258.95 191.03

3.53 - 3.00 1.00 10.59

1.60 - 1.10 1.00 1.76

1.95 - 1.10 1.00 2.15

1.30 - 3.00 1.00 3.90

1.35 - 2.80 1.00 3.78

0.55 - 2.80 1.00 1.54

3.48 - 2.80 1.00 9.74

2.15 - 2.80 1.00 6.02

0.60 - 2.80 1.00 1.68

0.60 - 2.80 1.00 1.68

0.75 - 2.80 1.00 2.10

2.18 - 2.80 1.00 6.10

2.30 - 2.80 1.00 6.44

2.40 - 2.80 1.00 6.72

2.10 - 2.80 1.00 5.88

3.20 - 2.80 1.00 8.96

1.51 - 2.80 1.00 4.23


1.25 - 2.80 1.00 3.50

3.78 - 2.80 1.00 10.58

2.20 - 0.90 1.00 1.98

0.60 - 2.80 1.00 1.68

4.85 - 2.80 1.00 13.58

2.63 - 3.00 1.00 7.89

0.55 - 3.00 1.00 1.65

1.48 - 3.00 1.00 4.44

2.27 - 3.00 1.00 6.81

3.40 - 3.00 1.00 10.20

2.15 - 3.00 1.00 6.45

2.30 - 3.00 1.00 6.90

4.55 - 2.80 1.00 12.74

2.80 - 3.00 1.00 8.40

1.05 - 3.00 1.00 3.15

2.60 - 3.00 1.00 7.80


10268
3041
12019
HOJA D
Proyecto : MODULO 3
Curso : COSTOS EN LA CONSTRUCCION

Nº MEDIDAS
Nº PARTIDA
VECES AREA AREA/PERIMETRO LARGO

AUTOCAD m2 m

02.03.01 ZAPATAS
02.03.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2
eje A - eje 8 2 1.94 1.55
eje D - eje 8 1 1.10 1.05
eje B - eje 4 1 1.73 1.65
eje D - eje 4 1 1.26 1.20
eje A - eje 3 1 2.06 1.65
eje A - eje 2 1 1.95 1.30
eje D - eje 2 1 1.81 1.45
eje F - eje 2 1 2.54 2.03

02.03.02 VIGAS DE CIMENTACION


02.03.02.01 VIGAS DE CIMENT, CONC 210 KG/CM2
eje D - eje 8 1 0.65 2.6
eje D - eje 4 1 0.84 3.35
eje D - eje 2 1 1.30 5.2
eje A - eje 2,3 1 0.88 3.53

02.03.03 PRIMER NIVEL


02.03.03.01 COLUMNAS Y PLACAS M3
02.03.03.01.01 COLUMNAS, CONCRETO 210 KG/CM2
P-12, EJE A - 3,4 1 0.06 0.25
P-13, EJE A - 3,4 2 0.08 0.3
P-13, EJE A - 3,4 1 0.05 0.15
P-26, EJE D,F - 3,4 1 0.04 0.15
P-15, EJE F - 3,4 1 0.11 0.15
P-16, EJE A - 4 1 0.59 1.00 1.00
P-17, EJE B - 4 1 0.21 0.25
P-9, EJE 4 2 0.10 0.25
P-10, EJE A - 5 1 0.06 0.15
P-18, EJE A - 5 1 0.13 0.15
P-19, EJE 5 1 0.28 0.25
P-26, EJE 5 2 0.04 0.15
P-10, EJE 6 1 0.06 0.15
ENMALLADO CON P-26, EJE 6 1 0.08 0.55
P-26, EJE 6 1 0.04 0.15
P-9,EJE 6 1 0.10 0.25
P-26, EJE 6 1 0.04 0.15
P-9, EJE 6,7 2 0.10 0.25
P-24, EJE 6-7 1 0.06 0.15
P-26, EJE 7 2 0.04 0.15
P-9, EJE 7 1 0.10 0.25
P-10, EJE 7 1 0.06 0.15
P-20, EJE 8 2 0.14 0.25
P-12, EJE 8 1 0.06 0.25
P-22, EJE 8-9 1 0.09 1.00 1.00
P-21, EJE 8-9 2 0.06 1.00 1.00
P-23, EJE 8-9 1 0.14 1.00 1.00
ENMALLADO 1 0.73 4.85
P-8, EJE 3 1 0.16 0.25
P-9, EJE 3 1 0.10 0.25
P-10, EJE 3 1 0.06 0.15
P-11, EJE 3 1 0.21 1.00 1.00
P-26, EJE 3 1 0.04 0.15
P-10, EJE 2-3 1 0.06 0.15
P-4, EJE 2 1 0.15 0.30
P-5, EJE 2 1 0.11 0.25
P-6, EJE 2 1 0.39 1.00 1.00
P-25, EJE 2 1 0.06 0.25
P-7, EJE 2 1 0.25 0.25
P-1- EJE 1 1 0.08 0.25
P-2, EJE 1 1 0.21 1.00 1.00
P-3, EJE 1 1 0.05 0.2
02.03.03 SEGUNDO NIVEL
02.03.03.01 COLUMNAS Y PLACAS M3
02.03.03.01.01 COLUMNAS, CONCRETO 210 KG/CM2
P-12, EJE A - 3,4 1 0.06 0.25
P-13, EJE A - 3,4 3 0.05 0.15
P-15, EJE F - 3,4 1 0.11 0.15
P-16, EJE A - 4 1 0.59 1.00 1.00
P-17, EJE B - 4 1 0.29 1.15
P-9, EJE 4 2 0.10 0.25
P-10, EJE A - 5 1 0.06 0.15
P-18, EJE A - 5 1 0.13 0.15
P-19, EJE 5 1 0.28 0.25
P-9,EJE 6 1 0.10 0.25
P-9, EJE 6,7 2 0.10 0.25
P-9, EJE 7 1 0.12 0.25
P-10, EJE 7 1 0.06 0.15
P-20, EJE 8 2 0.14 0.25
P-12, EJE 8 1 0.06 0.25
P-22, EJE 8-9 1 0.09 1.00 1.00
P-21, EJE 8-9 2 0.06 1.00 1.00
P-23, EJE 8-9 1 0.14 1.00 1.00
ENMALLADO 1 0.73 4.85
P-8, EJE 3 1 0.16 0.25
P-9, EJE 3 1 0.10 0.25
P-10, EJE 3 1 0.06 0.15
P-11, EJE 3 1 0.21 1.00 1.00
P-10, EJE 2-3 1 0.06 0.15
P-4, EJE 2 1 0.15 0.30
P-5, EJE 2 1 0.11 0.25
P-7, EJE 2 1 0.25 0.25
P- NUEVA - EJE 2 1 0.13 0.85
P-6, EJE 2 1 0.39 1.00 1.00
P-25, EJE 2 1 0.06 0.25
PRIMER PISO VECES AREA CAD AREA/PERIMETRO LARGO
02.03.03.03 LOSA ALIGERADA H=25CM 0.10
02.03.03.03.01 CONCRETO PREMEZCLADO LOSAS F´C 210 Kgf/cm2
Eje A-D , tramo 1-2 1 6.38 6.38 5.55
Eje A-D , tramo 2-3 1 21.56 20.98 5.55
Eje D-E , tramo 2-3 1 5.47 5.48 1.45
Eje A-D , tramo 3-4 1 22.33 22.48 5.55
Eje D-E, tramo 3-3´ 1 9.54 9.54 3.60
Eje D-E, tramo 3´-4 1 4.44 4.50 3.60
02.03.03.03.03 LOSA ALIGERADA, LADR. HUECO 25x30x30 69.72 69.36

02.03.03.04 LOSA ALIGERADA H=20CM 0.09


02.03.03.04.01 CONCRETO PREMEZCLADO LOSAS F´C 210 Kgf/cm2
Eje A-B , tramo 4-5 1 2.47 2.47 1.90
Eje A-B , tramo 5-7 1 8.05 6.84 1.90
Eje B-D , tramo 4-7 1 19.43 17.25 3.35
Eje D-F , tramo 4-6 1 11 11.06 3.95
Eje D-F , tramo 6-8 1 18.33 16.59 3.95
Eje A-C , tramo 7-8 1 4.43 4.40 2.75
Eje C-D, tramo 7-8 1 4.1 3.51 2.60
Eje D-F , tramo 8-9 1 6.25 6.25
02.03.03.04.03 LOSA ALIGERADA, LADR. HUECO 20x30x30 74.06 68.37

02.03.03.05 LOSA MACISA


02.03.03.05.01 CONCRETO PREMEZCLADO LOSAS F´C 210 Kgf/cm2 1 4.00 4.68 2.40

SEGUNDO PISO VECES AREA CAD AREA/PERIMETRO LARGO


02.03.03.03 LOSA ALIGERADA H=25 CM 0.10
02.03.03.03.01 CONCRETO PREMEZCLADO LOSAS F´C 210 Kgf/cm2

Eje A-D, tramo 4-5 (25) 1 7.15 7.29 5.50


Eje A-D, tramo 5-8 (25) 1 34.00 34.78 5.50
Eje A-D , tramo 3-4 (25) 1 22.28 22.72 5.50
Eje D-E, tramo 3-4 (25) 1 10.35 11.09 3.60
02.03.03.03.03 LOSA ALIGERADA, LADR. HUECO 20x30x30 73.78 67.78

02.03.03.04 LOSA ALIGERADA H= 20 CM 0.09


02.03.03.04.01 CONCRETO PREMEZCLADO LOSAS F´C 210 Kgf/cm2
Eje A-C , tramo 2-3 (20) 1 10.29 10.09 2.48
Eje C-D, tramo 2-3 (20) 1 10.48 10.32 2.50
Eje D-F, tramo 2-3 (20) 1 15.62 16.25 4.15
Eje D-F, tramo 4-7 (20) 1 22.95 23.01 5.90
Eje D-F, tramo 7-8 (20) 1 22.95 4.80 2.20
Eje D-F, tramo 7-8 (20) 1 5.87 4.80 2.20
02.03.03.04.03 LOSA ALIGERADA, LADR. HUECO 15x30x30 88.16 62.98

02.03.03.05 LOSA MACISA


TECHO DORMITORIO 1 10.81 6.80
02.03.03.05.01 CONCRETO PREMEZCLADO LOSAS F´C 210 Kgf/cm2 1 38.65
PARTIDA VIGAS DE TECHO N° AREA CAD Area/Perimetro Largo
PRIMER PISO VECES m2 m2 m
VIGAS
En eje NUMEROS
EJE 1
V-6 1 1.43 5.70
EJE 1
V-7 1 0.24 1.60
EJE 2
V-5 1 2.17 8.66
EJE 3
S-3 1 2.56 10.25
EJE 3´
S-10 1 0.94 3.75
EJE 4
V-4 1 1.43 5.70
S-8 1 1.05 4.20
EJE 4-6
S-1 1 0.54 2.15
S-1 1 0.98 3.90
EJE 6-7
V-3 1 2.20 5.50
EJE 8
V-2 1 1.32 5.50
EJE 8-9
V-1 1 0.61 4.05
EJE 8
V-2 1 1.56 3.90
VIGA CORTE A-A 1 3.30 5.50
VIGA CORTE A-A 3 5.94 23.75
VIGA CORTE A-A 1 1.38 5.50
En eje LETRAS
EJE A
V-23 1 4.12 16.48
S-4 1 0.62 2.47
EJE B
S-1 1 2.24 5.60
EJE C
S-5 1 0.31 2.05
EJE D
S-9 1 0.78 5.17
V-9 1 1.29 6.45
S-2 1 1.68 6.73
EJE D-E
V-13 1 0.24 1.58
V-10 1 1.51 3.78
EJE E
V-11 1 0.61 4.05
EJE F
S-7 1 0.57 3.78
V-12 1 0.70 2.80
S-6 1 1.43 5.70
SEGUNDO PISO N° AREA CAD Area/Perimetro Largo

VIGAS VECES m2 m2 m

En eje NUMEROS
EJE 1-2
V-33 y V-34 2 1.87 3.73
EJE 2
V-22 INF. 1 2.56 10.25
V-22 SUP. 1 1.34 5.36
EJE 2-3
V-21 1 1.09 2.73
V-32 Y V-30 2 2.07 4.14
V-31 1 3.23 6.46
EJE 3
V-20 1 2.33 9.30
EJE 3-3´
V-19 INF. 1 0.70 3.50
V-19 SUP. 1 0.72 3.60
EJE 4
V-18 1 2.28 5.70
S-11 1 1.10 4.40
EJE 5
V-17 1 2.20 5.50
EJE 6-7
V-5 1 1.38 5.50
EJE 6
V-16 1 1.56 3.90
EJE 7
V-35 1 0.98 3.90
V-35 1 1.14 4.55
EJE 8
V-15 INF. 1 1.50 6.00
V-15 SUP. 2 1.56 3.90
EJE 9
V-14 1 0.80 5.35
EJE 5-8
V-29 1 2.88 5.75
En eje LETRAS
EJE A
V-23 1 14.48 16.48
EJE C
V-24 1 2.12 3.78
EJE D
V-25 SUP. 1 0.81 4.03
V-25 SUP. 1 1.56 7.80
V-25 SUP. 1 0.94 4.70
V-25 INF. 1 2.16 8.65
EJE D-F
V-36 1 0.93 1.86
EJE E
V-26 1 0.61 4.05
EJE F
SOLERA S-12 1 1.34 8.90
V-27 1 2.23 8.90
ESCALERAS N° AREA CAD Area/Perimetro Largo
VECES m2 m2 m
PRIMER PISO
CIMIENTO 1.00 0.60 1.20
PASOS Y CONTRAPASOS 1.00 0.35 0.30 1.20
DESCANSOS 2.00 1.69 1.25
DESCANSO 1.00 2.13 1.70
GARGANTA 1.00 4.00 3.33
SEGUNDO PISO
PASOS Y CONTRAPASOS 1.00 0.30 0.24 0.95
DESCANSO 1.00 1.75 1.75
GARGANTA 1.00 2.17 2.28

PRIMER PISO VIGAS 32.91

CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 10.77


LOSA ALIGERADA H=20CM

CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 11.75 22.14


LOSA ALIGERADA, LADR. HUECO 15x30x30 UND 1,105.97 1863.80
LOSA ALIGERADA H=25CM
CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 9.56
LOSA ALIGERADA, LADR. HUECO 20x30x30 UND 757.83
LOSA MACISA

CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 0.83

VIGAS 52.25
SEGUNDO PI
CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 17.29
LOSA ALIGERADA H=20CM

CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 6.71 34.96


LOSA ALIGERADA, LADR. HUECO 15x30x30 UND 520.08 1277.91
LOSA ALIGERADA H=25CM
CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 22.74
LOSA ALIGERADA, LADR. HUECO 20x30x30 UND 757.83
LOSA MACISA
CONCRETO PREMEZCLADO LOSAS Y VIGAS F'C VARIABLE M3 5.51
TERCER NIVEL 1.95
VIGAS
CONCRETO PREMEZCLADO LOSAS Y VIGA M3 0.35
LOSA MACISA
CONCRETO PREMEZCLADO LOSAS Y VIGA M3 1.60
HOJA DE METRADO

MEDIDAS LADRILLO TECHO


PARCIAL TOTAL UND TOTAL
ANCHO ALTURA COEFICIENTE
UNIDADES
m m m3 m3 m3 8.33
87.79

9.80 m3
1.25 0.60 2.33
1.05 0.60 0.66
1.05 0.60 1.04
1.05 0.60 0.76
1.25 0.60 1.24
1.50 0.60 1.17
1.25 0.60 1.09
1.25 0.60 1.52

1.84 m3
0.25 0.5 0.33
0.25 0.5 0.42
0.25 0.5 0.65
0.25 0.5 0.44

15.55 m3

5.99 m3
0.25 2.55 0.16
0.25 2.55 0.38
0.3 2.55 0.11 7.29 m3
0.25 2.55 0.10 9.66
0.7 2.55 0.27
1.00 2.55 1.50
0.85 2.55 0.54
0.4 2.55 0.51
0.4 2.55 0.15
0.85 2.55 0.33
1.1 2.55 0.70
0.25 2.55 0.19
0.4 2.55 0.15
0.15 2.55 0.21
0.25 2.55 0.10
0.4 2.55 0.26
0.25 2.55 0.10
0.4 2.55 0.51
0.4 2.55 0.15
0.25 2.55 0.19
0.4 2.55 0.26
0.4 2.55 0.15
0.55 2.55 0.70
0.25 2.55 0.16
1.00 2.55 0.23
1.00 2.55 0.31
1.00 2.55 0.36
0.15 2.55 1.86
0.65 2.55 0.41
0.4 2.55 0.26
0.4 2.55 0.15
1.00 2.55 0.54
0.25 2.55 0.10
0.4 2.55 0.15
0.50 2.55 0.38
0.45 2.55 0.29
1.00 2.55 0.99
0.25 2.55 0.16
1.00 2.55 0.64
0.3 2.55 0.19
1.00 2.55 0.54
0.25 2.55 0.13
11.62 m3

6.76 m3
0.25 2.40 0.15
0.30 2.40 0.32
0.70 2.40 0.25
1.00 2.40 1.42
0.25 2.40 0.69
0.40 2.40 0.48
0.40 2.40 0.14
0.85 2.40 0.31
1.10 2.40 0.66
0.40 2.40 0.24
0.40 2.40 0.48
0.48 2.40 0.29
0.40 2.40 0.14
0.55 2.40 0.66
0.25 2.40 0.15
1.00 2.40 0.22
1.00 2.40 0.29
1.00 2.40 0.34
0.15 2.40 1.75
0.65 2.40 0.39
0.40 2.40 0.24
0.40 2.40 0.14
1.00 2.40 0.50
0.4 2.40 0.14
0.50 2.40 0.36
0.45 2.40 0.27
1.00 2.40 0.60
0.15 2.40 0.31
1.00 2.40 0.94
0.25 2.40 0.15
ANCHO ALTURA PARCIAL 14.03 m3 1110
13.09
6.94 m3
1.15 0.25 0.64 53.2
3.78 0.25 2.10 174.8
3.78 0.25 0.55 45.7
4.05 0.25 2.25 187.2
2.65 0.25 0.95 79.5
1.25 0.25 0.45 und 540

6.15 m3
20.6
1.30 0.20 0.22 57.0
3.60 0.20 0.62 143.7
5.15 0.20 1.55 92.1
2.80 0.20 1.00 138.2
4.20 0.20 1.49 36.7
1.60 0.20 0.40 29.2
1.35 0.20 0.32 52.1
0.56 570

0.94 m3
1.95 0.20 0.94
TAN(10) = 0.18 1209
ANCHO ALTURA Total Und. 41.1 1209
PARCIAL
19.48 m3
largo
7.59 m3 pitagoras
1.30 0.25 0.73 5.61 60.8
6.20 0.25 3.48 5.61 289.7
4.05 0.25 2.27 5.61 189.26
2.95 0.25 1.11 3.76 92.40
20.59 632

4.16 m3

3.78 0.20 0.91 2.67 84.07


3.78 0.20 0.93 2.73 85.96
3.78 0.20 1.46 4.30 135.40
3.90 0.20 2.07 5.90 191.7
1.95 0.20 0.43 2.46 40.0
1.95 0.20 0.43 2.46 40.0
20.5 577

0.20 0.00 2.16 m3


0.20 0.00 5.57 m3 LADRILLO
TOTAL
Total Und. COEFICIENTE
UNIDADES
Ancho Alto Parcial m3 m3 8.33 Und.
m m m3 13.93 m3
9.19 m3

0.25 0.40 0.57

0.15 0.40 0.10

0.25 0.25 0.54

0.25 0.25 0.64

0.25 0.25 0.23

0.25 0.40 0.57


0.25 0.25 0.26

0.25 0.20 0.11


0.25 0.20 0.20

0.40 0.20 0.44

0.24 0.40 0.53

0.15 0.20 0.12

0.40 0.20 0.31


0.60 0.20 0.66
0.25 0.20 3.56
0.25 0.25 0.34 4.83 m3

0.25 0.40 1.65


0.25 0.20 0.12

0.40 0.20 0.45

0.15 0.20 0.06

0.15 0.25 0.19


0.20 0.40 0.52
0.25 0.20 0.34

0.15 0.40 0.09


0.40 0.25 0.38

0.15 0.40 0.24

0.15 0.40 0.23


0.25 0.40 0.28
0.25 0.20 0.29
Ancho Alto Parcial Total Und.
TECHO Y
m m m3 13.17 m3 VIGAS 2DO
PISO 9.65
largo
9.01 m3 pitagoras

0.50 0.20 0.78 3.89

0.25 0.60 1.54


0.25 0.20 0.32 6.39

0.40 0.20 0.24 2.94


0.50 0.25 0.89 3.55
0.50 0.25 0.82 6.56

0.25 0.40 0.93

0.20 0.40 0.32 3.96


0.20 0.25 0.18

0.40 0.25 0.57


0.25 0.20 0.22

0.40 0.25 0.55

0.25 0.40 0.55 5.61

0.40 0.20 0.31

0.25 0.40 0.39


0.25 0.20 0.23

0.25 0.40 0.60


0.40 0.20 0.36 2.24

0.15 0.40 0.32

0.50 0.25 0.73 5.85


4.16 m3

0.25 0.40 1.65

0.50 0.20 0.39 3.94

0.20 0.40 0.33 4.18


0.20 0.40 0.62
0.20 0.40 0.39 4.83
0.25 0.40 0.87

0.50 0.20 0.19 1.86


0.15 0.40 0.24

0.15 0.40 0.53


0.25 0.40 0.89
Ancho Alto Parcial Total Und.
m m m3 3.81 m3
2.73
0.50 0.80 0.48
0.25 0.18 0.05
1.35 0.20 0.68
1.25 0.20 0.43
1.20 0.20 0.80
1.08
0.25 0.18 0.04
1.00 0.20 0.35
0.95 0.20 0.43
CONCRETO
TOTAL 27.95
VIGAS Y
LOSAS
VIGAS 13.93

CONCRETO
LOSAS 14.03
LADRILLO 1333

PARA
JUEVES techo final total
CONCRETO
36.46 9.02 29.63 38.64
TOTAL
VIGAS 13.17

CONCRETO
19.48
LOSAS
LADRILLO 1254

CONCRETO TOTAL
OBSERVACIONES
1332.8 1198 TOTAL LADRILLOS
159.7 AREA TOTAL
658

581

675

617

1349 TOTAL LADRILLOS


1254 TOTAL LADRILLOS
662

615

734
591

Observacion
04.04 VIGAS
04.04.01 VIGAS.- CONCRETO 210 KG/CM2
04.04.03 VIGAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA
04.04.04 VIGAS.- ACERO Fy=4200 kg/cm2

CONCRETO m3 TOTAL 27.68

Descripción # veces Largo Ancho Alto Parcial


1er Piso
En eje NUMEROS
EJE 1
V-6 1 5.25 0.25 0.40 0.525
EJE 1
V-7 1 1.60 0.15 0.40 0.096
EJE 2
V-5 1 8.10 0.25 0.40 0.810
EJE 3
S-3 1 6.45 0.25 0.25 0.403
EJE 3´
S-10 1 2.35 0.25 0.25 0.147
EJE 4
V-4 1 4.15 0.25 0.40 0.415
S-8 1 3.55 0.25 0.25 0.222
EJE 4-6
S-1 1 1.40 0.25 0.20 0.070
S-1 1 2.10 0.25 0.20 0.105
EJE 6-7
V-3 1 5.25 0.40 0.20 0.420
EJE 8
V-2 1 4.65 0.25 0.40 0.465
EJE 8-9
V-1 1 4.05 0.15 0.20 0.122
EJE 8
V-2 1 4.65 0.25 0.40 0.465
VIGA CORTE A-A 5 23.75 0.25 0.20 5.938

En eje LETRAS
EJE A
V-8 1 11.80 0.25 0.40 1.180
S-4 1 2.50 0.25 0.20 0.125
EJE B
S-1 1 4.10 0.25 0.20 0.205
EJE C
S-5 1 1.50 0.15 0.20 0.045
EJE D
S-9 1 4.53 0.15 0.25 0.170
V-9 1 5.10 0.20 0.40 0.408
S-2 1 5.45 0.25 0.20 0.273
EJE D-E
V-13 1 1.58 0.15 0.40 0.095
V-10 1 3.78 0.40 0.25 0.378
EJE E
V-11 1 2.55 0.15 0.40 0.153
EJE F
S-7 1 3.78 0.15 0.40 0.227
V-12 1 2.55 0.25 0.40 0.255
S-6 1 4.85 0.25 0.20 0.24

TOTAL 13.96
2do Piso
En eje NUMEROS
EJE 1
V-33 y V-34 2 3.57 0.50 0.20 0.714
EJE 2
V-22 - INFERIOR 1 8.48 0.25 0.40 0.848
V-22 - SUPERIOR 1 7.14 0.25 0.20 0.357
EJE 2
V-5 1 8.10 0.25 0.40 0.810
EJE 3
S-3 1 6.45 0.25 0.25 0.403
EJE 3´
S-10 1 2.35 0.25 0.25 0.147
EJE 4
V-4 1 4.15 0.25 0.40 0.415
S-8 1 3.55 0.25 0.25 0.222
EJE 4-6
S-1 1 1.40 0.25 0.20 0.070
S-1 1 2.10 0.25 0.20 0.105
EJE 6-7
V-3 1 5.25 0.40 0.20 0.420
EJE 8
V-2 1 4.65 0.25 0.40 0.465
EJE 8-9
V-1 1 4.05 0.15 0.20 0.122
EJE 8
V-2 1 4.65 0.25 0.40 0.465
VIGA CORTE A-A

En eje LETRAS

TOTAL 1ER PISO 0.59

3er Piso
En eje horizontal
EJE A
VA-4 4 2.70 0.25 0.55 1.485
EJE C
VA-3 4 2.70 0.25 0.70 1.890
EJE C' volado
seccion 2-2 4 3.61 0.20 0.70 2.022

En eje vertical
EJE 12, 8
VS-2(entre los ejes A y C) 4 1.95 0.24 0.55 1.030
VS-2(entre los ejes A y C) 2 2.4 0.24 0.55 0.634
V-301 (entre los ejes C y C') 2 2.2 0.24 0.55 0.581
EJES 11, 10, 9
V-303 (entre los ejes A y C) 3 7.00 0.30 0.70 4.410
V-302 (entre los ejes C y C') 3 2.20 0.30 0.55 1.089

TOTAL 1ER PISO 13.14


AC

Descripción Kg/ml # Veces Cant.


1er Piso
En eje horizontal
EJE A (VA-1: Øde 5/8'') 1.6 1 4
EJE A (VA-1: Øde 3/8'') 0.58 1 2
Estribos de 3/8'' 0.58 4 24

EJE C (VA-1: Øde 5/8'') 1.6 1 4


EJE C (VA-1: Øde 3/8'') 0.58 1 2
EJE C Estribos de 3/8'' 0.58 4 24

EJE C'
Seccion 1-1 :Øde 1/2'' 1.02 4 4
Seccion 1-1 :Øde 3/8'' 0.58 4 2
Estribos de 3/8´´ 0.58 4 24

En eje vertical
EJES 12, 8
VS-1 (entre los ejes A y C) 1.6 4 4
V-101 (entre los ejes C y C') 1.6 4 4
V-101 (entre los ejes C y C') BALANCIN 1.6 4 2
V-101 (entre los ejes C y C') 1.6 4 2
ESTRIBOS VS-1 0.58 4 21

EJES 11, 10 , 9
V-103 (entre ejes A y C) 2.25 3 4
V-103 2.25 3 2

V-103 (adicional en el medio de la viga) 2.25 3 2


estribos v-103 0.58 3 41

EJES 12, 8
V-101 (entre los ejes C y C') 1.6 2 2
V-101 (entre ejes C y C') BALANCIN 1.6 2 2
V-101 (entre los ejes C y C') 1.6 2 2
ESTRIBOS V-101 0.58 2 15

EJES 11, 10 , 9
V-102(entre los ejes C y C') 2.25 3 2
V-102(entre los ejes C y C') 1.6 3 2
V-102(entre los ejes C y C') 2.25 3 1
V-102(entre los ejes C y C') 1.6 3 2
ESTRIBOS V-102 0.58 3 15
2DOPiso
En eje horizontal
EJE A (VA-2: Øde 5/8'') 1.6 1 4
EJE A (VA-2: Øde 3/8'') 0.58 1 2
Estribos de 3/8'' 0.58 4 24

EJE C (VA-2: Øde 5/8'') 1.6 1 4


EJE C (VA-2: Øde 3/8'') 0.58 1 2
EJE C Estribos de 3/8'' 0.58 4 24

EJE C'
Seccion 1-1 :Øde 1/2'' 1.02 4 4
Seccion 1-1 :Øde 3/8'' 0.58 4 2
Estribos de 3/8´´ 0.58 4 24

En eje vertical
EJES 12, 8
VS-1 (entre los ejes A y C) 1.6 4 4
V-201 (entre los ejes C y C') 1.6 4 4
V-201 (entre los ejes C y C') BALANCIN 1.6 4 2
V-201 (entre los ejes C y C') 1.6 4 2
ESTRIBOS VS-1 0.58 4 21

EJES 11, 10 , 9
V-203 (entre ejes A y C) 2.25 3 4
V-203 2.25 3 2
V-203 (adicional en el medio de la viga) 2.25 3 2
estribos v-203 0.58 3 41

EJES 12, 8
V-201 (entre los ejes C y C') 1.6 2 2
V-201 (entre ejes C y C') BALANCIN 1.6 2 2
V-201 (entre los ejes C y C') 1.6 2 2
ESTRIBOS V-201 0.58 2 15

EJES 11, 10 , 9
V-202(entre los ejes C y C') 2.25 3 2
V-202(entre los ejes C y C') 1.6 3 2
V-202(entre los ejes C y C') 2.25 3 1
V-202(entre los ejes C y C') 1.6 3 2
ESTRIBOS V-202 0.58 3 15

3er Piso
En eje horizontal
EJE A (VA-4: Øde 5/8'') 1.6 1 4
EJE A (VA-4: Øde 3/8'') 0.58 1 2
Estribos de 3/8'' 0.58 4 24

EJE C (VA-3: Øde 5/8'') 1.6 1 4


EJE C (VA-3: Øde 3/8'') 0.58 1 2
EJE C Estribos de 3/8'' 0.58 4 24
EJE C'
Seccion 2-2 :Øde 1/2'' 1.02 4 4
Seccion 2-2 :Øde 3/8'' 0.58 4 2
Estribos de 3/8´´ 0.58 4 24

En eje vertical
EJES 12, 8
VS-2 (entre los ejes A y C) 1.6 4 4
V-301 (entre los ejes C y C') 1.6 4 4
V-301 (entre los ejes C y C') BALANCIN 1.6 4 2
V-301 (entre los ejes C y C') 1.6 4 2
ESTRIBOS VS-3 0.58 4 21

EJES 11, 10 , 9
V-303 (entre ejes A y C) 2.25 3 4
V-303 2.25 3 2
V-303 (adicional en el medio de la viga) 2.25 3 2
estribos v-303 0.58 3 41

EJES 12, 8
V-301 (entre los ejes C y C') 1.6 2 2
V-301 (entre ejes C y C') BALANCIN 1.6 2 2
V-301 (entre los ejes C y C') 1.6 2 2
ESTRIBOS V-301 0.58 2 15

EJES 11, 10 , 9
V-302(entre los ejes C y C') 2.25 3 2
V-302(entre los ejes C y C') 1.6 3 2
V-302(entre los ejes C y C') 2.25 3 1
V-302(entre los ejes C y C') 1.6 3 2
ESTRIBOS V-302 0.58 3 15
ACERO KG TOTAL +5%
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Long. Long.total 0.25 0.58 1.02 1.6 2.25

16.10 64.40 64.40


16.10 32.20 32.2
1.90 182.40 136.8

16.10 64.40 64.40


16.10 32.20 32.2
1.90 182.40 136.8

16.10 257.60 64.40


16.10 128.80 128.8
1.80 172.80 172.8

8.05 0.00 0.00


2.40 38.40 38.40
2.85 22.80 22.80
3.75 30.00 30.00
1.58 132.72 132.72

8.05 96.60 96.60


2.42 14.52 14.52

5.00 30.00 30.00


2.00 246.00 246.00

2.40 9.60 9.60


2.85 11.40 11.40
3.75 15.00 15.00
1.58 47.40 47.40

2.85 17.10 17.10


4.65 27.90 27.90
3.75 11.25 11.25
3.45 20.70 20.70
1.70 76.50 76.50
TOTAL

16.10 64.40 64.40


16.10 32.20 32.2
1.90 182.40 136.8

16.10 64.40 64.40


16.10 32.20 32.2
1.90 182.40 136.8

16.10 257.60 64.40


16.10 128.80 128.8
1.80 172.80 172.8

8.05 128.80 128.80


2.40 38.40 38.40
2.85 22.80 22.80
3.75 30.00 30.00
1.58 132.72 132.72

8.05 96.60 96.60


2.42 14.52 14.52
5.00 30.00 30.00
2.00 246.00 246.00

2.40 9.60 9.60


2.85 11.40 11.40
3.75 15.00 15.00
1.58 47.40 47.40

2.85 17.10 17.10


4.65 27.90 27.90
3.75 11.25 11.25
3.45 20.70 20.70
1.70 76.50 76.50
TOTAL

16.10 64.40 64.40


16.10 32.20 32.2
1.90 182.40 136.8

16.10 64.40 64.40


16.10 32.20 32.2
1.90 182.40 136.8
16.10 257.60 64.40
16.10 128.80 128.8
1.80 172.80 172.8

8.05 128.80 128.80


2.40 38.40 38.40
2.85 22.80 22.80
3.75 30.00 30.00
1.58 132.72 132.72

8.05 96.60 96.60


2.42 14.52 14.52
5.00 30.00 30.00
2.00 246.00 246.00

2.40 9.60 9.60


2.85 11.40 11.40
3.75 15.00 15.00
1.58 47.40 47.40

2.85 17.10 17.10


4.65 27.90 27.90
3.75 11.25 11.25
3.45 20.70 20.70
1.70 76.50 76.50
TOTAL
5,462.82 ECOFRADO M2 TOTAL

Kg Descripción # veces Largo Ancho Parcial


1er Piso
En eje horizon 2 15.76 0.5 15.76
103.040 EJE A, EJE C 2 15.76 0.30 9.456
18.676 VA-1 2 15.76 0.25 7.888
79.344
En eje vertical
103.040 EJE 11, EJE 1 3 7.59 1.00 22.770
18.676 ENTRE EJE A 3 7.59 0.30 6.831
79.344 V-103

EJE 12, EJE 8 2 2.20 0.55 2.420


65.688 ENTRE EJE A 2 2.20 0.35 1.540
74.704 V-101 2 2.20 0.24 1.056
100.224
EJE 11, EJE 1 3 2.05 0.70 4.305
ENTRE EJE C 3 2.05 0.30 1.845
TOTAL 1ER PISO
0.000
61.440
36.480 2do Piso
48.000 En eje horizon 2 15.76 0.5 15.76
76.978 EJE A, EJE C 2 15.76 0.30 9.456
VA-1 2 15.76 0.25 7.888

217.350 En eje vertical


32.670 EJE 11, EJE 1 3 7.59 1.00 22.770

67.500 ENTRE EJE A 3 7.59 0.30 6.831


142.680 V-103

EJE 12, EJE 8 2 2.20 0.55 2.420


15.360 ENTRE EJE A 2 2.20 0.35 1.540
18.240 V-101 2 2.20 0.24 1.056
24.000
27.492 EJE 11, EJE 1 3 2.05 0.70 4.305
ENTRE EJE C 3 2.05 0.30 1.845
TOTAL 2DO PISO
38.475
44.640
25.313 3er Piso
33.120 En eje horizon 2 15.76 0.5 15.76
44.370 EJE A, EJE C 2 15.76 0.30 9.456
1,596.843 VA-1 2 15.76 0.25 7.888

En eje vertical
103.040 EJE 11, EJE 1 3 7.59 1.00 22.770
18.676 ENTRE EJE A 3 7.59 0.30 6.831
79.344 V-103

103.040 EJE 12, EJE 8 2 2.20 0.55 2.420


18.676 ENTRE EJE A 2 2.20 0.35 1.540
79.344 V-101 2 2.20 0.24 1.056

EJE 11, EJE 1 3 2.05 0.70 4.305


65.688 ENTRE EJE C 3 2.05 0.30 1.845
74.704 TOTAL 3ER PISO
100.224

206.080
61.440
36.480
48.000
76.978

217.350
32.670
67.500
142.680

15.360
18.240
24.000
27.492

38.475
44.640
25.313
33.120
44.370
1,802.923

103.040
18.676
79.344

103.040
18.676
79.344
65.688
74.704
100.224

206.080
61.440
36.480
48.000
76.978

217.350
32.670
67.500
142.680

15.360
18.240
24.000
27.492

38.475
44.640
25.313
33.120
44.370
1,802.923
221.54

33.096

29.601

5.016

6.15
73.846

33.096

29.601

5.016

6.15
73.846
33.096

29.601

5.016

6.15
73.846
HOJA
Obra : VIVIENDA UNIFAMILIAR CHAVEZ OJEDA FINAL 27-08-2020
Ubicacion : SACHACA - AREQUIPA - AREQUIPA

Nº PARTIDA

03 ARQUITECTURA
03.01 PRIMER NIVEL
03.01.02 REVOQUES Y REVESTIMIENTOS
03.01.02.01 TARRAJEO EN MUROS EXTERIORES 1er y 2do PISO
Lado Derecho
Lado Izquierdo
Trasera
Frentera
Cerco Perimetrico
03.01.02.02 TARRAJEO EN MUROS INTERIORES
PRIMER PISO
Cochera
Columnas cochera
Hall entrada
Gradas
Sala
Comedor
Dormitorio Principal
Baño Visitas
Baño Principal
Cocina
Lavanderia
Deposito
SEGUNDO PISO
Hall
Sala Familiar
Comedor
Cocina
Lavanderia
Pasillo
Dormitorio 1
Dormitorio 2
Dormitorio 3
Baño Principal
Baño Social
TERCER PISO
Parapeto
Pared del techo
Techo Azotea
03.01.02.03 TARRAJEO DE SUPERFICIE VIGAS PERALTADAS
03.01.02.04 TARRAJEO PRIMARIO, MORTERO C:A 1:5
03.02.04 PISOS Y PAVIMENTOS

03.02.04.01 CONTRAPISO DE 48 mm

PRIMER PISO
Cochera
Hall entrada
Sala
Comedor
Dormitorio Principal
Baño Visitas
Baño Principal
Cocina
Lavanderia
Deposito
Piso Fachada
Pasillo Calle
Terraza
SEGUNDO PISO
Hall
Sala Familiar
Comedor
Cocina
Lavanderia
Pasillo
Dormitorio 1
Dormitorio 2
Dormitorio 3
Baño Principal
Baño Social
Balcon
TERCER PISO
Azotea
03.04 PINTURA
03.04.01 PINTURA LATEX EN CIELO RASO
1er, 2do y 3er PISO
03.04.02 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA
1er, 2do y 3er PISO
Exteriores
05 INSTALACIONES ELECTRICAS Y MECANICAS
05.01 SALIDA PARA LUZ, TOMACORRIENTES Y CAJAS
05.01.01 SALIDA DE TECHO (CENTRO DE LUZ)
05.01.02 SALIDA DE PARED (BRAQUETES)
05.01.03 SALIDA DE PISO
05.01.04 CAJA DE PASE PVC 100x100x50 mm
05.01.05 SALIDA INTERRUPTOR SIMPLE
05.01.06 SALIDA INTERRUPTOR DOBLE
05.01.07 SALIDA INTERRUPTOR CONMUTACION DOBLE
05.01.08 SALIDA INTERRUPTOR TRIPLE
05.01.09 SALIDA TOMACORRIENTE DOBLE CON PUESTA A TIERRA
05.01.10 SALIDA DE FUERZA
05.01.11 SALIDA DE FUERZA PARA COCINA
05.04 TABLEROS DE DISTRIBUCION
05.04.01 TABLERO DE DISTRIBUCION
05.05 SISTEMA DE PUESTA A TIERRA
05.05.01 SISTEMA DE PUESTA A TIERRA (SISTEMA ESTABILIZADO GENERAL)
06 INSTALACIONES DE COMUNICACIONES
06.01 SALIDA DE TELEFONIA Y DATA
06.02 SALIDA PARA INTERCOMUNICADOR
06.03 CAJA DE PASE PVC 100x100x50 mm
SENSORES DE SEGURIDAD
HOJA DE METRADO DE ARQUITECTURA

Nº MEDIDAS
PARCIAL TOTAL
VECES AREA/PERIMETRO LARGO ANCHO ALTURA

345.1
1.00 101.53 18.46 1.00 5.50 101.53
1.00 79.37 14.43 1.00 5.50 79.37
1.00 24.31 4.42 1.00 5.50 24.31
1.00 12.10 2.20 1.00 5.50 12.10
1.00 127.75 53.23 1.00 2.40 127.75
715.5
283.6
1.00 28.64 11.23 1.00 2.55 28.64
1.00 4.08 1.60 1.00 2.55 4.08
1.00 15.30 6.00 1.00 2.55 15.30
1.00 17.65 6.92 1.00 2.55 17.65
1.00 54.57 21.40 1.00 2.55 54.57
1.00 28.64 11.23 1.00 2.55 28.64
1.00 37.18 14.58 1.00 2.55 37.18
1.00 17.09 6.70 1.00 2.55 17.09
1.00 24.07 9.44 1.00 2.55 24.07
1.00 28.94 11.35 1.00 2.55 28.94
1.00 11.99 4.70 1.00 2.55 11.99
1.00 15.43 6.05 1.00 2.55 15.43
351.36
1.00 33.35 13.08 1.00 2.55 33.35
1.00 27.18 10.66 1.00 2.55 27.18
1.00 28.31 11.10 1.00 2.55 28.31
1.00 20.02 7.85 1.00 2.55 20.02
1.00 17.47 6.85 1.00 2.55 17.47
1.00 34.28 11.13 1.00 3.08 34.28
1.00 35.78 14.03 1.00 2.55 35.78
1.00 45.90 18.00 1.00 2.55 45.90
1.00 45.01 17.65 1.00 2.55 45.01
1.00 39.89 12.95 1.00 3.08 39.89
1.00 24.18 7.85 1.00 3.08 24.18
80.62
2.00 18.92 17.20 1.00 1.10 37.84
2.00 21.39 9.30 1.00 2.30 42.78
1.00 8.41 8.41
1.00 0.00 0.00 1.00 0.20 0.00
1.00 0.00 0.00 1.00 0.20 0.00
370.30
AREA-
AREA AREA-madera PERIMETRO Porcelanato PERIMETRO
95.17 50.79 196.41
1.00 31.67 12.57
1.00 9.05 6.77
1.00 35.37 19.85
1.00 19.39 12.32
1.00 31.36 28.44
1.00 3.12 7.55 3.12
1.00 6.48 10.30 6.48
1.00 10.16 14.25 10.16
1.00 4.39 4.81
1.00 2.87 7.10 2.87
1.00 15.97 15.97
1.00 14.73 6.70
1.00 11.85 8.10 11.85
91.43 149.46
1.00 7.06 4.60
1.00 23.36 9.77
1.00 14.35 8.50
1.00 16.68 8.67
1.00 3.41 6.85
1.00 9.89 11.53
1.00 17.52 17.04
1.00 18.51 18.51
1.00 18.26 18.20
1.00 8.07 14.09
1.00 4.02 8.00
1.00 8.33 10.07

1.00 24.43 20.55 24.43


1408.60

1.00 348.01 348.01

1.00 715.54 1060.59


1.00 345.06

Nº VECES 1er Piso 2do Piso 3er Piso


24 12.00 11.00 1.00
98 47.00 45.00 6.00
3 3.00
0
51 26.00 23.00 2.00
0
0
0
60 34.00 25.00 1.00
0
0
0
0
0
0
0
0
0
0
12 12.00 0.00 0.00
03
UND OBSERVACIONES
03.01
03.01.01
03.01.01.01
03.02
m² 03.02.01
03.02.01.01
03.02.01.02
03.02.02
03.02.02.01
03.02.02.02
m² 03.02.02.03
m² 03.02.02.04
03.02.03
03.02.03.01
03.02.04
03.02.04.01
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.02
03.03.02.01
03.03.02.02
03.03.03
m² 03.03.03.01
03.04
03.04.01
03.04.02
03.05
03.05.01
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
m² 04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
m² 04.02

04.02.01

m² 04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05
04.04.06
04.04.07
m² 04.04.08
04.04.09
04.04.10
05
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.01.09
05.01.10
m² 05.01.11
m² 05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
UND 05.04
PTO 05.04.01
PTO 05.05
PTO 05.05.01
UND 06
PTO 06.01
PTO 06.02
PTO 06.03
PTO 06.04
PTO 06.04.01
PTO 06.04.02
PTO 07
07.01
PZA 07.01.01
07.01.01.01
JGO 07.01.01.02
07.02
PTO 07.02.01
PTO 07.02.02
UND 07.02.03
PTO 07.02.04
07.03
07.03.01
07.03.02
07.03.03
08
08.01
09
09.01
ARQUITECTURA
PRIMER NIVEL
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 M2 165.00
SEGUNDO NIVEL
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 M2 157.97
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1 M2 22.02
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN MUROS EXTERIORES M2 200.00
TARRAJEO EN MUROS INTERIORES M2 400.00
TARRAJEO DE SUPERFICIE VIGAS PERALTADA M2 134.34
TARRAJEO PRIMARIO, MORTERO C:A 1:5 M2 38.95
CIELORRASOS
CIELO RASO CON MEZCLA C:A 1:5 M2 169.00
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 mm M2 180.00
TERCER NIVEL
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 M2 30.82
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1 M2 11.64
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN MUROS EXTERIORES M2 70.11
TARRAJEO EN MUROS INTERIORES M2 130.00
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 mm M2 29.61
PINTURA
PINTURA LATEX EN CIELO RASO M2 501.14
PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA M2 1,400.00
CUBIERTAS
ENCHAPE CON LADRILLO PASTELERO M2 210.00
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA. - PVC PTO 18.00
TUBERIA PVC CLASE 10 - 1 1/2" M 6.30
TUBERIA PVC CLASE 10 - 1" M 42.35
TUBERIA PVC CLASE 10 - 3/4" M 24.01
TUBERIA PVC CLASE 10 - 1/2" M 52.56
VALVULA DE COMPUERTA DE BRONCE 1/2" UND 12.00
VALVULA DE COMPUERTA DE BRONCE 3/4" UND 2.00
VALVULA DE COMPUERTA DE BRONCE 1" UND 1.00
VALVULA DE COMPUERTA DE BRONCE 1 1/2" UND 1.00
LLAVE DE RIEGO C/GRIFO DE 1/2" PZA 4.00
SISTEMA DE AGUA CALIENTE

SALIDA DE AGUA CALIENTE - H-3 PTO 21.00

TUBERIA H-3 1/2" M 25.01


TUBERIA H-3 3/4" M 28.97
VALVULA DE COMPUERTA DE BRONCE 1/2" UND 7.00
VALVULA DE COMPUERTA DE BRONCE 3/4" UND 2.00
SISTEMA DE DRENAJE PLUVIAL
TUBERIA DE BAJADA PVC-SAL 3" P/LLUVIAS M 20.40
DESAGÜE Y VENTILACION
SALIDA DE DESAGUE EN PVC 2" PTO 10.00
SALIDA DE DESAGUE EN PVC 4" PTO 4.00
SALIDA PARA VENTILACION PTO 4.00
TUBERIA PVC-SAL 2" M 60.71
TUBERIA PVC-SAL 4" M 116.83
YEE PVC SAL 2" UND 6.00
YEE PVC SAL 4" UND 18.00
TRAMPA P PVC 2" UND 15.00
SOMBRERO PARA VENTILACION DE PVC DE 2" UND 4.00
CAJA DE REGISTRO UND 4.00
INSTALACIONES ELECTRICAS Y MECANICAS
SALIDA DE TECHO (CENTRO DE LUZ) PTO 68.00
SALIDA DE PARED (BRAQUETES) PTO 32.00
SALIDA DE PISO PTO 10.00
CAJA DE PASE PVC 100x100x50 mm UND 6.00
SALIDA INTERRUPTOR SIMPLE PTO 16.00
SALIDA INTERRUPTOR DOBLE PTO 7.00
SALIDA INTERRUPTOR CONMUTACION DOBLE PTO 15.00
SALIDA INTERRUPTOR TRIPLE PTO 1.00
SALIDA TOMACORRIENTE DOBLE CON PUESTA A T PTO 47.00
SALIDA DE FUERZA PTO 2.00
SALIDA DE FUERZA PARA COCINA PTO 2.00
CABLEADO
CABLEADO SALIDAS DE ACOMETIDAS A TABLEROS PTO 4.00
CABLEADO SALIDAS DE TOMACORRIENTES PTO 51.00
CABLEADO SALIDAS DE ILUMINACION PTO 110.00
CANALIZACIONES Y/O TUBERIAS
TUBERIA PVC (ELECTRICAS) D=20 mm M 77.27
TUBERIA PVC (ELECTRICAS) D=25 mm M 503.45
TABLEROS DE DISTRIBUCION
TABLERO DE DISTRIBUCION PZA 2.00
SISTEMA DE PUESTA A TIERRA
SISTEMA DE PUESTA A TIERRA (SISTEMA ESTABIL JGO 3.00
INSTALACIONES DE COMUNICACIONES
SALIDA DE TELEFONIA Y DATA PTO 17.00
SALIDA PARA INTERCOMUNICADOR PTO 4.00
CAJA DE PASE PVC 100x100x50 mm UND 12.00
CANALIZACIONES Y/O TUBERIAS
TUBERIA PVC (ELECTRICAS) D=20 mm M 77.27
TUBERIA PVC (ELECTRICAS) D=25 mm M 503.45
CERCO PERIMETRICO
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION PARA SUBZAPATA ZAPATAS Y C M3 33.86
ELIMINACION MATERIAL EXCEDENTE C/MAQUI M3 42.32
OBRAS DE CONCRETO SIMPLE
SUBZAPATAS: CONCRETO 1:12 + 30% P.M. (INCLU M3 4.84
CIMIENTOS CORRIDOS: CONCRETO 1:10 + 30% P.M. M3 21.77
CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% M3 5.22
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO M2 69.62
OBRAS DE CONCRETO ARMADO
COLUMNAS, CONCRETO 210 KG/CM2 M3 2.24
COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 46.46
COLUMNAS, ACERO fy=4200 kg/cm2 KG 300.00
MUROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM M2 107.25
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN MUROS INTERIORES M2 137.30
PERIMETRO
PINTURA UNIDAD AREA (m2)
(mL)
FACHADA PRINCIPAL EXTERIOR m2 32.77 24.08
VIGA COCHERA m2 3.6 12.83
FACHADA POSTERIOR CUARTOS m2 10.59 19.2
FACHADA PORTERIOR COCINA,CUARTO m2 23.86 22.03
FACHADA LATERAL IZQUIEDA -COCHERA m2 66.21 45.46
FACHADA LATERAL DERECHA - SALAS m2 15.19 18.6
FACHADA LATERAL DERECHA m2 78.43
PRIMER PISO
COCHERA m2 37.8 12.33
SALA m2 61.2
COMEDOR m2 14.34
DORMITORIO Y BAÑO PRINCIAL m2 46.39
HALL Y GRADAS m2 31.54
TERRAZA m2 12.63
MURO PERIMETRICO m2 126.41
SEGUNDO PISO
HALL Y GRADAS m2 17.85
SALA - COMEDOR - PASILLO m2 96 33.08
DORMITORIO LEONARDO - PARED PUERTA m2 9.95
DORMITORIO LEONARDO m2 33.6
DORMITORIO MARCELO - PARED REPISAS m2 9.56
DORMITORIO MARCELO - FONDO REPISAS m2 0.8
DORMITORIO MARCELO m2 35.38
DORMITORIO CLAUDIO m2 1
DORMITORIO CLAUDIO m2 5.81
DORMITORIO CLAUDIO - RESTO DE PAREDES m2 23.9
TOTAL m2 794.81

20 M2 EL GALON m2 GALONES
500.5 25.0
75.5 3.8
9.6 0.5
0.8 0.04
1.0 0.1
5.8 0.3
23.9 1.2
37.8 1.9
126.4 6.3
10.0 0.5
3.6 0.2
794.8 39.7
PISOS O CERAMICOS CANTIDAD UNIDAD

m2
1er, 2doY 3er PISO 359

INSTALACIONES ELECTRICAS CANTIDAD UNIDAD


SALIDA DE TECHO (CENTRO DE LUZ) 24 PTO
SALIDA DE PARED (BRAQUETES) 94 PTO
SALIDA DE PISO 3 PTO
SALIDA INTERRUPTOR SIMPLE 51 PTO
SALIDA TOMACORRIENTE DOBLE CON PUESTA A TIERRA 60 PTO
SENSORES DE SEGURIDAD 12 PTO
Dimensiones
COLOR CISTERNA Nro. Varillas
(m)
BLANCO OSTRA + 4 BLANCOS altura 1 2 2.4
GRANADA 1908 CPP SATINADO altura 2 2 1.6
BLANCO OSTRA ancho 1.6 1.6
BLANCO OSTRA + 4 BLANCOS largo 2.4 2.4
BLANCO OSTRA + 4 BLANCOS TOTAL 8.0
BLANCO OSTRA 16
Dimensiones
BLANCO OSTRA + 4 BLANCOS TAPA Nro. Varillas
(m)
espesor 0.2
GRIS CLASICO + 1 BLANCO ancho 1.6 2.0
BLANCO OSTRA + 4 BLANCOS largo 2.4 2.31
BLANCO OSTRA TOTAL 4.3
BLANCO OSTRA + 4 BLANCOS 8.7
BLANCO OSTRA + 4 BLANCOS
BLANCO OSTRA + 4 BLANCOS descripcion area (m2) volumen (m3)
GRIS CLASICO 8419 AMERICAN cisterna 3.84 0.77
empedrado 43.76 3.50
BLANCO OSTRA + 4 BLANCOS total 47.6 4.27
BLANCO OSTRA + 4 BLANCOS
MANANTIAL cemento 5 21.3
BLANCO OSTRA + 4 BLANCOS arena 0.5 2.1
AMARILLO CITRICO + 1 BLANCO piedra 0.9 3.8
AMARILLO CITRICO + 4 BLANCO
BLANCO OSTRA
VERDE TENIS
VERDE TENIS + 1 BLANCOS
VERDE TENIS + 4 BLANCOS

COLOR DE PINTURA
BLANCO OSTRA + 4 BLANCOS
BLANCO OSTRA
AMARILLO CITRICO + 1 BLANCO
AMARILLO CITRICO + 4 BLANCO
VERDE TENIS
VERDE TENIS + 1 BLANCOS
VERDE TENIS + 4 BLANCOS
GRIS CLASICO + 1 BLANCO
GRIS CLASICO 8419 AMERICAN
MANANTIAL
GRANADA 1908 CPP SATINADO
TOTAL
ACCESORIOS - ELECTRICIDAD 1er PISO 2do PISO AZOTEA TOTAL
PLACA DOBLE - (1 COMUTADOR) - (1
1 1 - 2
INTERRUPTOR)
PLACA TRIPLE - (1 COMUTADOR) - (2
1 5 - 6
INTERRUPTORES)
CONMUTADOR SIMPLE 8 6 1 15
CONMUTADOS DOBLE 10 4 - 14
CONMUTADOR TRIPLE 4 4 - 8
INTERRUPTOR SIMPLE 5 7 - 12
INTERRUPTOR DOBLE 2 2 1 5
INTERRUPTOR TRIPLE 1 1 - 2
TOTAL INTERRUMPORES 32 30 2 64
TOMACORRIENTE 38 34 1 73
TAPAS DE CAJAS DE PASO 20x20 cm 6 5 1 12
TAPAS DE CAJAS DE PASO 16x16 cm - - 1 1

ACCESORIOS - GASFITERIA 1er PISO 2do PISO AZOTEA TOTAL ENTRADA DE 2" PERO LA CAB
SUMIDEROS 2" - PISOS - CAMPANA 9 4 - 13
SUMIDEROS 2" - DUCHA - REJILLA 2 2 - 4
SUMIDEROS 3" - PISOS - REJILLA - - 1 1
REGISTROS 2" - 3 - 3
REGISTROS 4" 2 2 - 4
PUNTOS DE AGUA 5 - - 5
TAPAS PARA LAS LLAVES 19x21 cm 1 3 - 4
Volumen
area (m2)
(m3)
4 0.8 9 varillas de 2.4m
4 0.8 9 varillas de 1.6m
3.2 0.64 7 varillas de 2m
4.8 0.96 11 varillas de 2m
3.2

Volumen
area (m2)
(m3)

3.84 0.77 7 varillas de 2.60


3.84 0.77 11 varillas de 1.80
1.5

22.41 1.05
2.24
4.03
RADA DE 2" PERO LA CABEZA O PARTE SUPERIOR DEBE SER DE 3"
PERIMETRO -
AREA - PISO AREA - PARED AREA -
NIVEL AMBIENTE MATERIAL (m2) (m2) CONTRAZOCA TECHO (m2)
LO (mL)
1er - Piso HALL ENTRADA MADERA 9.05 - 6.77 -
1er - Piso SALA MADERA 35.37 - 19.85 -
1er - Piso COMEDOR MADERA 19.39 - 12.32 -
1er - Piso DORMITORIO PRINCIPAL MADERA 24.10 - 28.44 -
TOTAL 87.91 - 67.38 -
1er - Piso COCHERA PORCELANATO 31.67 - 13.93 -
1er - Piso PASILLO PORCELANATO 14.73 - 6.70 -
1er - Piso LAVANDERIA PORCELANATO 4.39 12.73 4.81 -

TOTAL 50.79 - 25.44 -

1er - Piso BAÑO VISITAS PORCELANATO 3.12 16.82 7.55 -


1er - Piso BAÑO PRINCIPAL PORCELANATO 6.35 29.9 10.30 -
1er - Piso COCINA PORCELANATO 6.18 2.85 10.47 -

1er - Piso DEPOSITO PORCELANATO 3.09 - 4.81 -

1er - Piso PISO FACHADA PORCELANATO 15.97 - - -


1er - Piso TERRAZA PORCELANATO 10.71 - 8.10 -
FACHALETA INGRESO
1er - Piso PASILLO PORCELANATO - 10.40 - -
1er y 2do FACHALETA PARED GRADAS PORCELANATO - 18.75 - -
Piso

1er - Piso FACHALETA JARDIN PORCELANATO - 8.64 - -

CONTRAZOCALO MURO
1er - Piso EXTERIOR PORCELANATO - - 8.60 -

1er - Piso CONTRAZOCALO EXTERIOR PORCELANATO - - 77.63 -


CERCO - CASA
PERIMETRO - AREA -
NIVEL AMBIENTE MATERIAL AREA - PISO AREA - PARED
ZOCALO TECHO (m2)

2do - Piso HALL MADERA 7.06 - 4.60 -

2do - Piso SALA FAMILIAR MADERA 23.36 - 9.77 -

2do - Piso COMEDOR MADERA 14.35 - 8.5 -

2do - Piso PASILLO MADERA 9.89 - 11.53 -

2do - Piso DORMITORIO 2 MADERA 16.13 - 18.51 -


2do - Piso DORMITORIO 3 MADERA 16.00 - 18.20 -
TOTAL 86.79 - 71.11 -

2do - Piso DORMITORIO 1 PORCELANATO 15.24 - 17.04 16.44

2do - Piso COCINA PORCELANATO 10.24 1.65 8.67 -

2do - Piso LAVANDERIA PORCELANATO 3.41 14.90 6.85 -

2do - Piso BAÑO PRINCIPAL PORCELANATO 8.07 32.50 14.09 -

2do - Piso BAÑO SOCIAL PORCELANATO 4.02 18.60 8.00 -

2do - Piso BALCÓN PORCELANATO 8.33 - 10.07 -


2do Piso FACHALETA COLUMNA PORCELANATO - 1.28 - -
BALCON
2do y 3er PARED GRADAS FACHALETA PORCELANATO - 18.25 - -
Piso
3er Piso AZOTEA PORCELANATO 24.43 - 20.55 -
PARED PARED PARED PARED PISO
AMBIENTE PARED LAVATORIO- PARED DUCHA - VENTANA- DUCHA - PISO LAVATORIO UNIDADES
INTERRUPTOR GRANDE DUCHA
INODORO GRANDE DUCHA GRANDE E INODORO

BAÑO METROS
VISITAS 1er 1.48 4.08 4.46 2.17 2.71 2.17 1.06 2.03 CUADRADOS
PISO (m2)
GRADAS 1er PISO MEDIDAS
13 Escalones 120 cm largo
25 cm ancho (paso)
2 DESCANSOS 120 x 120 cm
GRADAS 2do PISO MEDIDAS
10 Escalones 95 cm largo
25 cm ancho (paso)
5 Abanicos 0.43 m2
Triangulares 0.43 m2
0.24 m2
0.24 m2
0.37 m2
2 Escalones de costado 145 cm largo
169 cm largo
25 cm Ambos ancho (paso)

También podría gustarte