CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 7.12 77.0384 0.356 77.3944 Bol
AGREGADO FINO 0.4 7.12 2.848 0.356 3.204 M3
AGREGADO GRUESO 0.69 7.12 4.9128 0.356 5.2688 M3
AGUA 207.55 7.12 1477.756 1477.756 LTS
Aditivo Sika Aer 552 7.12 3930.24 3930.24 LTS
GROUTING F'C=31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP (E=5CM) + SIKADUR32 + ADITIVOS
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 0.08 0.87642 0.00405 0.88047 Bol
AGREGADO FINO 0.4 0.08 0.0324 0.00405 0.03645 M3
AGREGADO GRUESO 0.69 0.08 0.05589 0.00405 0.05994 M3
AGUA 207.55 0.08 16.81155 16.81155 LTS
Aditivo Sika Aer 552 0.08 44.712 44.712 LTS
CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 4.57 49.4474 0.2285 49.6759 Bol
AGREGADO FINO 0.4 4.57 1.828 0.2285 2.0565 M3
AGREGADO GRUESO 0.69 4.57 3.1533 0.2285 3.3818 M3
AGUA 207.55 4.57 948.5035 948.5035 LTS
Aditivo Sika Aer 552 4.57 2522.64 2522.64 LTS
GROUTING F'C=31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP (E=5CM) + SIKADUR32 + ADITIVOS
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 0.04 0.43821 0.002025 0.440235 Bol
AGREGADO FINO 0.4 0.04 0.0162 0.002025 0.018225 M3
AGREGADO GRUESO 0.69 0.04 0.027945 0.002025 0.02997 M3
AGUA 207.55 0.04 8.405775 8.405775 LTS
Aditivo Sika Aer 552 0.04 22.356 22.356 LTS
CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 2.16 23.3712 0.108 46.9584 Bol
AGREGADO FINO 0.4 2.16 0.864 0.108 1.944 M3
AGREGADO GRUESO 0.69 2.16 1.4904 0.108 3.1968 M3
AGUA 207.55 2.16 448.308 896.616 LTS
Aditivo Sika Aer 552 2.16 1192.32 1192.32 LTS
CIMENTACIÓN DEL TRANSFORMADORES DE POTENCIA - BTP
CONCRETO F'C = 10 MPA PARA SOLADOS E=0,10M
FC=100KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 6.46 5.00 32.3 0.25 32.55 Bol
AGREGADO FINO 0.49 5.00 2.45 0.25 2.7 M3
AGREGADO GRUESO 0.69 5.00 3.45 0.25 3.7 M3
AGUA 212.62 5.00 1063.1 1063.1 LTS
Aditivo Sika Aer 329.55 5.00 1647.75 1647.75 LTS
CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 34.00 367.88 1.7 369.58 Bol
AGREGADO FINO 0.4 34.00 13.6 1.7 15.3 M3
AGREGADO GRUESO 0.69 34.00 23.46 1.7 25.16 M3
AGUA 207.55 34.00 7056.7 7056.7 LTS
Aditivo Sika Aer 552 34.00 18768 18768 LTS
CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 11.00 119.02 0.55 119.57 Bol
AGREGADO FINO 0.4 11.00 4.4 0.55 4.95 M3
AGREGADO GRUESO 0.69 11.00 7.59 0.55 8.14 M3
AGUA 207.55 11.00 2283.05 2283.05 LTS
Aditivo Sika Aer 552 11.00 6072 6072 LTS
CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 1.08 11.6856 0.054 11.7396 Bol
AGREGADO FINO 0.4 1.08 0.432 0.054 0.486 M3
AGREGADO GRUESO 0.69 1.08 0.7452 0.054 0.7992 M3
AGUA 207.55 1.08 224.154 0 224.154 LTS
Aditivo Sika Aer 552 1.08 596.16 596.16 LTS
CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO
FC=310KG/CM2 CANT. VOL. CONC. TOTAL DESP. 5% TOTAL DE MAT.
CEMENTO 10.82 2.56 27.6992 0.128 111.3088 Bol
AGREGADO FINO 0.4 2.56 1.024 0.128 4.608 M3
AGREGADO GRUESO 0.69 2.56 1.7664 0.128 7.5776 M3
AGUA 207.55 2.56 531.328 0 2125.312 LTS
Aditivo Sika Aer 552 2.56 1413.12 1413.12 LTS
Partida INST. PROVISIONALES DE ELECTRICIDAD (TODO LO REQUERIDO PARA EL USO DEL CONTRATISTA)
T.C 3.31
Rendimiento GLB Costo unitario directo por : M3 S/. 980.00 $296.07
Partida CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO
T.C 3.31
Rendimiento 16.00 M3/DIA Costo unitario directo por : M3 S/. 815.55 $246.39
Partida GROUTING F'C=31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP (E=5CM) + SIKADUR32 + ADITIVOS
T.C 3.31
Rendimiento 60.00 M2/DIA Costo unitario directo por : M2 S/. 71.34 $21.55
Partida SUM. E INST. DE GRAVA DE TM DE 2" A 4" SOBRE REJILLAS, ESPESOR DE 20 CM.
T.C 3.31
Rendimiento 70.00 M2/DIA Costo unitario directo por : M3 S/. 72.83 $22.00
Partida SUM. E INST. DE TUBERÍA 6" ASTM A53 GRADO B ESPESOR MÍNIMO 6MM
T.C 3.31
Rendimiento 8.00 M2/DIA Costo unitario directo por : M2 S/. 464.50 $140.33
SUM. E INST. DE TUBOS COLECTORES DE PVC-SAP Φ4" (INCL. TODOS LOS TRABAJOS NECESARIOS PARA SU COL., EXC., RELLENOS COMPACTADOS, ETC.)
Partida
T.C 3.31
Rendimiento 15.00 M/DIA Costo unitario directo por : M S/. 99.55 $30.08
Equipos
HERRAMIENTAS MANUALES %MO 5.00 96.37 4.82
4.82
Subpartida
EXCAVACION MANUAL DE TERRENO NORMAL M3 1.00 64.91 64.91
64.91
PRESUPUESTO DE OBRA
PROYECTO : AMPLIACIÓN DE LA SE SELENE 6633kV
CLIENTE : Compañía Minera ARES S.A.C.
DEPARTAMENTO : APURIMAC
PARTE VI : OBRAS CIVILES
CODIGO DESCRIPCION UND CANT LUNES MARTES MIERC JUEVES VIERNES SABADO DOMING
PATIO DE LLAVES 19 20 21 22 23 24 25
3.00 OBRAS DE CONCRETO ARMADO
3.01 CIMENTACIONES DE EQUIPO HÍBRIDO 66 KV - BEH-1 (1)
3.01.05 CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO M3 7.12
3.01.06 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 14.40
3.01.07 ACERO FY = 420 MPA KG 640.80 X X
3.01.08 GROUTING F'C=31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP (E=5CM) + SIKADUR32 + ADITIVOS M2 1.62
3.01.09 SUM. E INST. PERNOS DE ANCLAJE DE 1" ACERO SAE 1045 UND 8.00
3.02 CIMENTACIONES DE EQUIPO HÍBRIDO 33 KV - BEH-2 (1)
3.02.05 CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO M3 4.57
3.02.06 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 9.12
3.02.07 ACERO FY = 420 MPA KG 411.30 X X
3.02.08 GROUTING F'C=31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP (E=5CM) + SIKADUR32 + ADITIVOS M2 0.81
3.02.09 SUM. E INST. PERNOS DE ANCLAJE DE 1" ACERO SAE 1045 UND 4.00
3.03 CIMENTACIONES DE BAJADA DE CABLES - BC (2)
3.03.04 CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO M3 2.16
3.03.05 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 22.82
3.03.06 ACERO FY = 420 MPA KG 129.44
3.03.07 SUMINISTRO E INST. PERNOS DE ANCLAJE DE 3/4" ACERO SAE 1045 UND 8.00
3.04 CIMENTACIÓN DEL TRANSFORMADORES DE POTENCIA - BTP
3.04.04 CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO M3 14.00 X (18,19)
3.04.05 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 99.00 X-4 (17,18,19) X-4 X-4
3.04.06 ACERO FY = 420 MPA KG 3,800.00
3.04.07 SUM. E INST. DE RIEL 60 LB/YARDA (INCLUYE TODOS LOS ELEMENTOS NECESARIOS PARA SU INST.) M 15.30 X
3.04.08 SUM. E INST. DE REJILLA GALVANIZADA DE CONTENCIÓN DE GRAVA COMPUESTA POR PLETINAS, ÁNGULOS Y FIERROS L M2 40.00
3.04.09 SUM. E INST. DE GRAVA DE TM DE 2" A 4" SOBRE REJILLAS, ESPESOR DE 20 CM. M2 40.00
3.04.10 SUM. E INST. DE TUBERÍA 6" ASTM A53 GRADO B ESPESOR MÍNIMO 6MM M 2.00 X
3.04.11 ACABADO DE CEMENTO:ARENA 1:4 PARA PENDIENTE EN EL FONDO DE LA LOSA M2 40.00 X
3.04.12 SUM. E INST. DE CÁNCAMOS DE TIRO Φ 1" UND 2.00 X
3.05 LOSA DE APROXIMACIÓN PARA TRANSFORMADOR DE POTENCIA - LA
3.05.04 CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO M3 11.00 X
3.05.05 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 10.00
3.05.06 ACERO FY = 420 MPA KG 1,200.00 X-4 X-4 X
3.05.07 SUM. E INST. DE RIEL 60 LB/YARDA (INCLUYE TODOS LOS ELEMENTOS NECESARIOS PARA SU INST. EN PERFIL H) M 17.00
3.05.08 SUM. E INST. DE CÁNCAMOS DE TIRO Φ 1" UND 2.00
3.05.09 SUM. E INST. DE PERFILES H - W8"X48, A572 GR 50 M 17.00
3.06 BUZÓN DE RECUPERACIÓN DE ACEITE - BRA
3.06.04 CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO M3 1.08
3.06.05 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 11.41
3.06.06 ACERO FY = 420 MPA KG 64.72
3.06.07 SUM. E INST. DE VÁLVULA Φ 4", TIMÓN Y VÁSTAGO UND 1.00
3.07 BUZÓN DE CABLES BZ DE 0,60X0,60X0,80M (4)
3.07.01 EXCAVACIÓN EN SUELO M3 3.40
3.07.02 ELIMINACIÓN DE MATERIAL EXCEDENTE M3 3.40
3.07.03 CONCRETO F'C = 10 MPA PARA SOLADOS E=0,10M M2 3.24
3.07.04 CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO M3 2.56
3.07.05 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 28.68
3.07.06 ACERO FY = 420 MPA KG 152.72
3.08 DUCTOS SUBTERRÁNEOS EN CONCRETO 2 Φ 4" (36M)
3.08.01 EXCAVACIÓN EN SUELO M3 15.12
3.08.02 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO M3 8.64
3.08.03 ELIMINACIÓN DE MATERIAL EXCEDENTE M3 6.48
3.08.04 CONCRETO F'C = 10 MPA PARA SOLADOS E=0,10M M2 21.60
3.08.05 CONCRETO F'C = 31 MPA (A/C ≤ 0,45) CON CEMENTO TIPO IP + AIRE INCORPORADO M3 2.30
3.08.06 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 14.40
3.08.07 SUMINISTRO E INSTALACIÓN DE TUBERÍA PVC-SAP Φ 4" M 72.00
4.00 TRABAJOS COMPLEMENTARIOS EN EL PATIO DE LLAVES
4.01 GRAVA (RIPIO)
4.01.01 SUM. Y COLOCACIÓN DE GRAVA (RIPIO) DE TM 3/4" EN PATIOS, ESPESOR DE 10 CM M2 450.00
4.02 RED DE TIERRA
4.02.01 EXCAVACIÓN EN SUELO M3 48.00
4.02.02 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO (VEGETAL) M3 12.00
4.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO M3 36.00
4.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE M3 12.00
4.03 CERCO DE MALLA METÁLICA
4.03.01 DESMONTAJE, ADECUACIÓN Y MONTAJE DE CERCO DE MALLA EXISTENTE (A CERCO DESMONTABLE) M 12.00
4.04 DRENAJES
4.04.01 SUM. E INST. DE TUBOS COLECTORES DE PVC-SAP Φ4" (INCLUYE TODOS LOS TRABAJOS NECESARIOS PARA SU COLOCAC M 90.00
4.04.02 POZOS DE PERCOLACIÓN DE 0,30X0,30X0,30M UND 6.00