PRESUPUESTO

OBRA : 0204004 OBRAS COMPLEMENTARIAS DEL COMPLEJO TURISTICO EL ALGARROBAL


FORMULA : 01 CERCO PERIMETRICO DE PISCINA
CLIENTE : MUNICIPALIDAD DISTRITAL EL ALGARROBAL
Departamento: MOQUEGUA Provincia: ILO Distrito:ILO COSTO AL 15/08/06

ITEM DESCRIPCION UND MET. PRECIO PARCIAL SUB.TOT. TOTAL


1 OBRAS PROVISIONALES
1.01 CARTEL DE OBRA, DE 3.60X2.40M Y TRIPLAY 6MM UND 1.00 420.17 420.17
1.02 MOVILIZACION Y DESMOV. DE EQUIPO Y HERRAMIENTAS GLB 1.00 252.10 252.10
1.03 MOVILIZACION Y DESMOVILIZACION DE PERSONAL OBRERO GLB 1.00 840.34 840.34
1.04 GUARDIANIA EN OBRA MES 1.50 2,248.80 3,373.20 4,885.81

2 TRABAJOS PRELIMINARES
2.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR C/EQUIPO M3 506.87 1.12 567.69
2.02 DEMOLICION DE LOSA DE CONCRETO E=0.10M M2 1.80 5.76 10.37
2.03 REMOCION DE SISTEMA DE TANQUE ELEVADO DE AGUA GLB 1.00 500.00 500.00
1,078.06
3 MOVIMIENTO DE TIERRAS
3.01 CORTE MASIVO C/RETROEXCAV. T/NORMAL M3 561.75 3.23 1,814.45
3.02 CORTE MANUAL DE TERRENO SUELTO M3 137.61 12.69 1,746.27
3.03 EXCAVACION PARA CIMIENTOS EN TERRENO NORMAL M3 82.15 19.53 1,604.39
3.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 245.51 14.51 3,562.35
3.05 REFINE Y COMPACTADO DE SUBRASANTE M2 258.95 2.24 580.05
3.06 RELLENO COMPACTADO e= 10CM CON MAT. RESTAMO M2 258.95 4.20 1,087.59
3.08 ELIMINACION MAT. EXCEDENTE C/VOLQLUETE CARGADOR 6KM M3 696.92 6.62 4,613.61
15,008.71
4 CONCRETO SIMPLE
4.01 CIMIENTOS CORRIDOS 1:10 C-H+30% PG M3 56.55 114.28 6,462.53
4.02 SOBRECIMIENTOS CONCRETO C:H 1:8 + 25% PM M3 4.01 177.37 711.25
4.03 SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO M2 55.06 23.25 1,280.15
4.04 GRADAS: CONCRETO F'c= 140 KG/CM2 M3 6.67 245.08 1,634.68
4.05 GRADAS: ENCOFRADO Y DESENCOFRADO (APOY. S/TERRENO) M2 21.81 23.72 517.33
4.06 MURO DE CONTENCION: CONCRETO F´c= 175 KG/CM2 M3 115.18 287.09 33,067.03
4.07 MURO DE CONTENCION: ENCOFRADO Y DESENCOFRADOY NORMAL M2 539.25 26.98 14,548.97
4.08 MURO DE PIEDRA CARAVISTA: CONCRETO F¨C=140 KG/CM2 C/ANCLAJE M3 41.79 276.83 11,568.73
4.09 MURO DE PIEDRA CARAVISTA: ENCOFRADO Y DESENCOFRADO NORMAL M2 306.97 20.36 6,249.91
4.10 MURO DE CONTENCIO: JUNTAS DE DILATACION C/TECNOPORT E=1" M2 34.88 14.25 497.04 76,537.62

5.00 CONCRETO ARMADO


5.01 COLUMNAS: CONCRETO 175 KG/CM2 M3 1.11 344.12 381.97
5.02 COLUMNAS: ENCOFRADO Y DESENCOFADO NORMAL M2 17.03 33.68 573.57
5.03 COLUMNAS: ACERO GRADO 60 KG 142.87 3.75 535.76
5.04 VIGAS: CONCRETO F¨C=175 KG/CM2 M3 0.48 274.84 131.92
5.05 VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL M2 8.00 36.56 292.48
5.06 VIGAS: ACERO GRADO 60 KG 40.56 3.64 147.64 2,063.34

6.00 ALBAÑILERIA
6.01 MURO DE LADRILLO KK ARCILLA - SOGA, C/M 1:4 M2 27.24 41.47 1,129.64 1,129.64

7.00 REVESTIMIENTOS
7.01 TARRAJEO FROTACHADO EN INTERIORES M2 469.58 15.19 7,132.92
7.02 TARRAJEO DE CORONAMIENTOS DE MUROS M2 58.52 17.14 1,003.03
7.03 REVESTIMIENTO DE GRADAS DE CEMENTO C/ESCORIA LAVADA M2 40.42 21.26 859.33 8,995.28

8.00 PISOS, PAVIMENTOS Y VEREDAS M2 33.30 47.65 1,586.75


8.01 VEREDA CEM. LAV. C/ESCORIA Y CINTAS DE OCRE E=4", F'c=140 KG/CM2 M2 225.65 35.90 8,100.84
8.02 VEREDA CEMENTO PULIDA BRUÑADA E=4! F'C=140 KG/CM2 M 95.10 4.81 457.43 10,145.02
8.03 JUNTAS DE DILATACION E= 1", H4"
9.00 CARPINTERIA METALICA
9.01 CERCO DE MALLA METALICA TIPO 1: COCADA 2"/ALAMBRE GALV. 12 M2 128.28 95.13 12,203.28
9.02 CERCO DE MALLA METALICA TIPO 2: COCADA 2"/ALAMBRE GALV. 12 M2 217.90 85.65 18,663.14
9.03 PUERTA CON MALLA METALICA: COCADA 2"/ ALAMBRE GALV. 12 M2 16.04 110.99 1,780.28
9.04 PUERTA DE REJA METALICA C/TUBO CUADRADO 2" UND 1.00 1,384.96 1,384.96 34,031.66

10.00 PINTURA
10.01 PINTURA EN MUROS Y CORONAMIENTOS C/LATEX M2 528.10 6.48 3,422.09
10.02 PPINTURA ANTICORROSIVA Y ESMALTE DOS MANOS M2 371.84 11.92 4,432.33 7,854.42

11.00 OTROS
11.01 CAJA DE REGISTRO DESAGUE 12" X 24" C/TAPA CONCETO UND 2.00 139.40 278.80
11.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 150 MM S-25 U.F M 25.00 16.62 415.50
11.03 SALIDA PARA BRAQUETES C/INTERRUPTOR PTO 2.00 60.29 120.58
11.04 BRAQUETE DE PARED TIPO JOSFEL O SIMILAR + LAMAPRA 100W UND 2.00 35.54 71.08
11.05 LIMPIEZA FINAL DE OBRA GLB 1.00 250.01 250.01 1,135.97

COSTO DIRECTO 162,865.53


GASTOS GENERALES FIJOS 0.75% 1,221.49
GASTOS GENERALES VARIABLES 2.75% 4,478.80
UTILIDAD 0.00% 0.00
SUBTOTAL 168,565.82
IGV 19.00% 32,027.51
TOTAL PRESUPUESTO 200,593.33
MAYSERCSA

VALORIZACION DE OBRA Nro. 01

CORRESPONDIENTE AL MES DE : NOVIEMBRE


PLAZO DE EJECUCION : 45 Dias Calendarios
OBRA : OBRAS COMPLEMETARIAS DEL COMPLEJO TURISTICO EL ALGARROBAL FECHA INICIO OBRA :
FORMULA : CERCO PERIMETRICO DE LA PISCINA MUNICIPAL FECHA FINAL DE OBRA :
CLIENTE : MUNICIPALIDAD DISTRITAL EL ALGARROBAL
DEPARTAMENTO : MOQUEGUA PROVINCIA : ILO DISTRITO : ALGARROBAL

A V A N C E S

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDOS

UND METRADO P.UNIT. P.TOTAL METRADO VALORIZ. METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ %

PART. DESCRIPCION S/. s/ S/. S/. S/. S/.

1 OBRAS PROVISIONALES
1.01 CARTEL DE OBRA, DE 3.60X2.40M Y TRIPLAY 6MM UND 1.00 420.17 420.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 420.17 100.00%
1.02 MOVILIZACION Y DESMOV. DE EQUIPO Y HERRAMIENTAS GLB 1.00 252.10 252.10 0.00 0.00 0.50 126.05 0.20 0.50 126.05 50.00 0.50 126.05 50.00%
1.03 MOVILIZACION Y DESMOVILIZACION DE PERSONAL OBRERO GLB 1.00 840.34 840.34 0.00 0.00 0.50 420.17 0.06 0.50 420.17 50.00 0.50 420.17 50.00%
1.04 GUARDIANIA EN OBRA MES 1.50 2,248.80 3,373.20 0.00 0.00 1.00 2248.8 0.03 1.00 2,248.80 66.67 0.50 1,124.40 33.33%

2 TRABAJOS PRELIMINARES
2.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR C/EQUIPO M3 506.87 1.12 567.69 0.00 0.00 506.87 567.69 89.29 506.87 567.69 100.00 0.00 0.00 0.00%
2.02 DEMOLICION DE LOSA DE CONCRETO E=0.10M M2 1.80 5.76 10.37 0.00 0.00 1.80 10.368 17.36 1.80 10.37 100.00 0.00 0.00 0.00%
2.03 REMOCION DE SISTEMA DE TANQUE ELEVADO DE AGUA GLB 1.00 500.00 500.00 0.00 0.00 1.00 500 0.20 1.00 500.00 100.00 0.00 0.00 0.00%

3 MOVIMIENTO DE TIERRAS
3.01 CORTE MASIVO C/RETROEXCAV. T/NORMAL M3 561.75 3.23 1,814.45 0.00 0.00 561.75 1,814.45 30.96 561.75 1,814.45 100.00 0.00 0.00 0.00%
3.02 CORTE MANUAL DE TERRENO SUELTO M3 137.61 12.69 1,746.27 0.00 0.00 137.61 1,746.27 7.88 137.61 1,746.27 100.00 0.00 0.00 0.00%
3.03 EXCAVACION PARA CIMIENTOS EN TERRENO NORMAL M3 82.15 19.53 1,604.39 0.00 0.00 82.15 1,604.39 5.12 82.15 1,604.39 100.00 0.00 0.00 0.00%
3.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 245.51 14.51 3,562.35 0.00 0.00 180.50 2619.055 5.07 180.50 2,619.06 73.52 65.01 943.30 26.48%
3.05 REFINE Y COMPACTADO DE SUBRASANTE M2 258.95 2.24 580.05 0.00 0.00 258.95 580.048 44.64 258.95 580.05 100.00 0.00 0.00 0.00%
3.06 RELLENO COMPACTADO e= 10CM CON MAT. RESTAMO M2 258.95 4.20 1,087.59 0.00 0.00 200.00 840 18.39 200.00 840.00 77.23 58.95 247.59 22.77%
3.08 ELIMINACION MAT. EXCEDENTE C/VOLQLUETE CARGADOR 6KM M3 696.92 6.62 4,613.61 0.00 0.00 450.00 2,979.00 9.75 450.00 2,979.00 64.57 246.92 1,634.61 35.43%

4 CONCRETO SIMPLE
4.01 CIMIENTOS CORRIDOS 1:10 C-H+30% PG M3 56.55 114.28 6,462.53 0.00 0.00 50.55 5,776.85 0.78 50.55 5,776.85 89.39 6.00 685.68 10.61%
4.02 SOBRECIMIENTOS CONCRETO C:H 1:8 + 25% PM M3 4.01 177.37 711.25 0.00 0.00 4.01 711.25 0.56 4.01 711.25 100.00 0.00 0.00 0.00%
4.03 SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO M2 55.06 23.25 1,280.15 0.00 0.00 55.06 1280.145 4.30 55.06 1,280.15 100.00 0.00 0.00 0.00%
4.04 GRADAS: CONCRETO F'c= 140 KG/CM2 M3 6.67 245.08 1,634.68 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 6.67 1,634.68 100.00%
4.05 GRADAS: ENCOFRADO Y DESENCOFRADO (APOY. S/TERRENO) M2 21.81 23.72 517.33 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 21.81 517.33 100.00%
4.06 MURO DE CONTENCION: CONCRETO F´c= 175 KG/CM2 M3 115.18 287.09 33,067.03 0.00 0.00 115.18 33067.0262 0.35 115.18 33,067.03 100.00 0.00 0.00 0.00%
4.07 MURO DE CONTENCION: ENCOFRADO Y DESENCOFRADOY NOR M2 539.25 26.98 14,548.97 0.00 0.00 539.25 14548.965 3.71 539.25 14,548.97 100.00 0.00 0.00 0.00%
4.08 MURO DE PIEDRA CARAVISTA: CONCRETO F¨C=140 KG/CM2 C/A M3 41.79 276.83 11,568.73 0.00 0.00 38.79 10738.2357 0.34 38.79 10,738.24 92.82 3.00 830.49 7.18%
4.09 MURO DE PIEDRA CARAVISTA: ENCOFRADO Y DESENCOFRADO M2 306.97 20.36 6,249.91 0.00 0.00 270.97 5516.9492 4.34 270.97 5,516.95 88.27 36.00 732.96 11.73%
4.10 MURO DE CONTENCIO: JUNTAS DE DILATACION C/TECNOPORT E M2 34.88 14.25 497.04 0.00 0.00 34.80 495.9 7.00 34.80 495.90 99.77 0.08 1.14 0.23%
A V A N C E S

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDOS

UND METRADO P.UNIT. P.TOTAL METRADO VALORIZ. METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ %

PART. DESCRIPCION S/. s/ S/. S/. S/. S/.

5.00 CONCRETO ARMADO


5.01 COLUMNAS: CONCRETO 175 KG/CM2 M3 1.11 344.12 381.97 0.00 0.00 1.11 381.9732 0.29 1.11 381.97 100.00 0.00 0.00 0.00%
5.02 COLUMNAS: ENCOFRADO Y DESENCOFADO NORMAL M2 17.03 33.68 573.57 0.00 0.00 17.03 573.5704 2.97 17.03 573.57 100.00 0.00 0.00 0.00%
5.03 COLUMNAS: ACERO GRADO 60 KG 142.87 3.75 535.76 0.00 0.00 142.87 535.7625 26.67 142.87 535.76 100.00 0.00 0.00 0.00%
5.04 VIGAS: CONCRETO F¨C=175 KG/CM2 M3 0.48 274.84 131.92 0.00 0.00 0.48 131.9232 0.36 0.48 131.92 100.00 0.00 0.00 0.00%
5.05 VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL M2 8.00 36.56 292.48 0.00 0.00 8.00 292.48 2.74 8.00 292.48 100.00 0.00 0.00 0.00%
5.06 VIGAS: ACERO GRADO 60 KG 40.56 3.64 147.64 0.00 0.00 40.56 147.6384 27.47 40.56 147.64 100.00 0.00 0.00 0.00%

6.00 ALBAÑILERIA
6.01 MURO DE LADRILLO KK ARCILLA - SOGA, C/M 1:4 M2 27.24 41.47 1,129.64 0.00 0.00 27.24 1129.6428 2.41 27.24 1,129.64 100.00 0.00 0.00 0.00%

7.00 REVESTIMIENTOS
7.01 TARRAJEO FROTACHADO EN INTERIORES M2 469.58 15.19 7,132.92 0.00 0.00 410.58 6236.7102 5.76 410.58 6,236.71 87.44 59.00 896.21 12.56%
7.02 TARRAJEO DE CORONAMIENTOS DE MUROS M2 58.52 17.14 1,003.03 0.00 0.00 20.52 351.7128 2.05 20.52 351.71 35.07 38.00 651.32 64.94%
7.03 REVESTIMIENTO DE GRADAS DE CEMENTO C/ESCORIA LAVADA M2 40.42 21.26 859.33 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 40.42 859.33 100.00%

8.00 PISOS, PAVIMENTOS Y VEREDAS


8.01 VEREDA CEM. LAV. C/ESCORIA Y CINTAS DE OCRE E=4", F'c=140 M2 33.30 47.65 1,586.75 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 33.30 1,586.75 100.00%
8.02 VEREDA CEMENTO PULIDA BRUÑADA E=4! F'C=140 KG/CM2 M2 225.65 35.90 8,100.84 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 225.65 8,100.84 100.00%
8.03 JUNTAS DE DILATACION E= 1", H4" M 95.10 4.81 457.43 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 95.10 457.43 100.00%

9.00 CARPINTERIA METALICA


9.01 CERCO DE MALLA METALICA TIPO 1: COCADA 2"/ALAMBRE GALV. M2 128.28 95.13 12,203.28 0.00 0.00 115.28 10966.5864 0.94 115.28 10,966.59 89.87 13.00 1,236.69 10.13%
9.02 CERCO DE MALLA METALICA TIPO 2: COCADA 2"/ALAMBRE GALV. M2 217.90 85.65 18,663.14 0.00 0.00 195.90 16778.835 1.05 195.90 16,778.84 89.90 22.00 1,884.30 10.10%
9.03 PUERTA CON MALLA METALICA: COCADA 2"/ ALAMBRE GALV. 12 M2 16.04 110.99 1,780.28 0.00 0.00 8.04 892.3596 0.45 8.04 892.36 50.12 8.00 887.92 49.88%
9.04 PUERTA DE REJA METALICA C/TUBO CUADRADO 2" UND 1.00 1,384.96 1,384.96 0.00 0.00 0.50 692.48 0.04 0.50 692.48 50.00 0.50 692.48 50.00%

10.00 PINTURA
10.01 PINTURA EN MUROS Y CORONAMIENTOS C/LATEX M2 528.10 6.48 3,422.09 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 528.10 3,422.09 100.00%
10.02 PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS M2 371.84 11.92 4,432.33 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 371.84 4,432.33 100.00%

11.00 OTROS
11.01 CAJA DE REGISTRO DESAGUE 12" X 24" C/TAPA CONCETO UND 2.00 139.40 278.80 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 2.00 278.80 100.00%
11.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 150 MM S-25 U M 25.00 16.62 415.50 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 25.00 415.50 100.00%
11.03 SALIDA PARA BRAQUETES C/INTERRUPTOR PTO 2.00 60.29 120.58 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 2.00 120.58 100.00%
11.04 BRAQUETE DE PARED TIPO JOSFEL O SIMILAR + LAMAPRA 100W UND 2.00 35.54 71.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 71.08 100.00%
11.05 LIMPIEZA FINAL DE OBRA GLB 1.00 250.01 250.01 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 1.00 250.01 100.00%

COSTO DIRECTO 162,865.52 - 127,303.30 78.16% 127,303.30 78.16% 35,562.22 21.84%


GASTOS GENERALES 8.00% 13,029.24 - 10,184.26 78.16% 10,184.26 78.16% 2,844.98 21.84%
UTILIDAD 7.00% 11,400.59 - 8,911.23 78.16% 8,911.23 78.16% 2,489.36 21.84%
SUBTOTAL 187,295.36 146,398.81 78.16% 146,398.81 78.16% 40,896.57 21.84%

FACTOR DE RELACION 90.0% 168,565.82 131,758.93 131,758.93 36,806.91


IGV 19.00% 32,027.51 - 25,034.20 78.16% 25,034.20 78.16% 6,993.31 21.84%
TOTAL PRESUPUESTO 200,593.33 156,793.12 156,793.12 43,800.22
TOTAL VALORIZACIÒN - 127,303.30 78.16% 127,303.30 78.16% 35,562.22 21.84%
MASYSERCSA

AMORTIZACION ADELANTO DIRECTO


OBRA : 0204004 OBRAS COMPLEMENTARIAS DEL COMPLEJO TURISTICO EL ALGARROBAL
FORMULA : 01 CERCO PERIMETRICO DE PISCINA
CONTRATISTA : MATERIALES Y SERVICIOS DE LA CONSTRUCCION SA. (MAYSERCSA)
SUPERVISOR : AREA GEOGRÁFICA : 4
LUGAR : Departamento : MOQUEGUA Provincia : ILO Distrito : EL ALGARROBAL FECHA DE PRESUPUESTO :

ADELANTO DIRECTO (20%)


FECHA DE PAGO : PARCIAL I.G.V. TOTAL
15 - Octubre - 2006 33,713.17 6,405.50 40,118.67

ITEM VALORIZADO AMORTIZACION


(Montos sin IGV) PARCIAL ACUMULADO
131,758.93 26,351.79 26,351.79
31-Dec General
131,758.93 26,351.79 26,351.79

AMORTIZACION DE ACUERDO A VALORIZACION(SIN IGV) 26,351.79

AMORTIZACION POR MONTO NO CORRESPONDIENTE A VALORIZACION (DEDUCTIVO 0.00

AMORTIZACION PRESENTE VALORIZACION 26,351.79

ACUMULADO AMORTIZACION ANTERIOR (SIN I.G.V.) 0.00

TOTAL AMORTIZACION A LA FECHA 26,351.79

SALDO POR AMORTIZAR (SIN I.G.V.) 7,361.38


MAYSERCSA

AMORTIZACION ADELANTO MATERIALES

OBRA : 0204004 OBRAS COMPLEMENTARIAS DEL COMPLEJO TURISTICO EL ALGARROBAL


FORMULA : 01 CERCO PERIMETRICO DE PISCINA
CONTRATISTA : MATERIALES Y SERVICIOS DE LA CONSTRUCCION SA. (MAYSERCSA)
SUPERVISOR : AREA GEOGRÁFICA : 4
LUGAR : Departamento : MOQUEGUA Provincia : ILO Distrito : EL ALGARROBAL FECHA DE PRESUPUESTO :

ADELANTO DIRECTO (40.00 %)


FECHA DE PAGO : PARCIAL I.G.V. TOTAL
15-Octubre-2006 67,426.33 12,811.00 80,237.33

ITEM VALORIZADO AMORTIZACION


(Montos sin IGV) PARCIAL ACUMULADO
131,758.93 52,703.57 52,703.57
31-Dec General
131,758.93 52,703.57 52,703.57

AMORTIZACION DE ACUERDO A VALORIZACION (SIN IGV) 52,703.57

AMORTIZACION POR MONTO NO CORRESPONDIENTE A VALORIZACION (DEDUCTIVOS) 0.00

AMORTIZACION PRESENTE VALORIZACION 52,703.57

ACUMULADO AMORTIZACION ANTERIOR (SIN I.G.V.) 0.00

TOTAL AMORTIZACION A LA FECHA 52,703.57

SALDO POR AMORTIZAR (SIN I.G.V.) 14,722.76


CUADRO RESUMEN
VALORIZACION N° 01

OBRA OBRAS COMPLEMETARIAS DEL COMPLEJO TURISTICO EL ALGARROBAL


CERCO PERIMETRICO DE LA PISCINA MUNICIPAL
CONTRATISTA MATERIALES Y SERVICIOS DE LA CONSTRUCCIÓN S.A.
SUPERVISOR Ing. Jorge LAMA
RESIDENTE: Ing Héctor A. OCHARAN PONCE

MONTOS DIFERENCIA POR


CONCEPTO RECALCULADOS MONTOS PAGADOS PAGAR

(A) DE LAS VALORIZACIONES

Valorizaciones Ppto Principal 131,758.93 - 131,758.93

Valorizaciones de Adicional N° 01 - - -

Total Valorizaciones 131,758.93 - 131,758.93

(B) REAJUSTE DE PRECIOS

Reintegro Ppto Principal - - -

Reintegro de Adicional N° 01 - - -

Total de Reintegros - - -

( C ) ADELANTOS OTORGADOS

Adelante Directo

1.- Amortizacion Adelanto Directo (26,351.79) (26,351.79) (26,351.79)

Adelanto de Materiales

1.- Amortizacion Adel. Para Materiales (52,703.57) (52,703.57) (52,703.57)

Total de Adelantos (79,055.36) (79,055.36) (79,055.36)

(D) DEDUCTIVOS DE REINTEGROS -

Adelanto Directo - - -

Adelanto para Materiales - - -

Total de Deduccion de Reintegros - - -

( E) TOTAL GENERAL 52,703.57 52,703.57 52,703.57

( F ) IGV 19% 10,013.68 10,013.68 10,013.68

(G) MONTO A COBRAR S/. 62,717.24 62,717.24 62,717.24