CRONOGRAMA DE EJECUCION FISICO

PROYECTO: INSTALACION DEL SISTEMA DE RIEGO POR ASPERSION EN EL SECTOR CONCHARUMIYOC - ANCATIYANA, LOCALIDAD DE PUCA PUCA, DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY - APURIMAC
SECTOR CONCHARUMIYOC - ANCATIYANA

COSTO MES 1 MES 2 MES 3


SUB SISTEMAS
ITEM DESCRIPCION TOTAL
CONCHARUMIYOC FISICO FISICO FISICO
ANCATIYANA S/.

1.00 OBRAS PRELIMINARES 1,815.00 1,815.00 0% 0.00 0% 0.00 0% 0.00


1.01 CARTEL DE OBRA EN BANNER 550.00 550.00 100% 550.00 0% 0.00 0% 0.00
1.02 CONSTRUCCION DE CAMPAMENTO 1,265.00 1,265.00 100% 1,265.00 0% 0.00 0% 0.00
02 CAMARA DE CARGA (02 UNID) 15,402.40 15,402.40 0% 0.00 0% 0.00 0% 0.00
02.01 TRABAJOS PRELIMINARES 8.91 8.91 0% 0.00 0% 0.00 0% 0.00
02.01.01 TRAZO Y REPLANTEO 8.91 8.91 100% 8.91 0% 0.00 0% 0.00
02.02 MOVIMIENTO DE TIERRAS 346.64 346.64 0% 0.00 0% 0.00
02.02.01 EXCAVACION MANUAL EN TERRENO SUELTO 159.82 159.82 100% 159.82 0% 0.00 0% 0.00
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE 186.82 186.82 100% 186.82 0% 0.00 0% 0.00
02.03 OBRAS DE CONCRETO 15,046.85 15,046.85 0% 0.00 0% 0.00 0% 0.00
02.03.01 SOLADO DE CONCRETO 2" MEZCLA 1:12 C-H 222.36 222.36 0% 0.00 100% 222.36 0% 0.00
02.03.02 CONCRETO ARMADO F'C=175 KG/CM2. 4,475.70 4,475.70 0% 0.00 100% 4,475.70 0% 0.00
02.03.03 ENCOFRADO Y DESENCOFRADO NORMAL 1,977.73 1,977.73 0% 0.00 100% 1,977.73 0% 0.00
02.03.04 ACERO GRADO 60 2,206.18 2,206.18 0% 0.00 100% 2,206.18 0% 0.00
02.03.05 TARRAJEO CON CEMENTO-ARENA 983.61 983.61 0% 0.00 100% 983.61 0% 0.00
02.03.06 TARRAJEO CON IMPERMEABILIZANTES 1,000.19 1,000.19 0% 0.00 100% 1,000.19 0% 0.00
02.03.07 SUMINISTRO Y COLOC. DE ACCESORIOS Y VALVULAS 4" - CAMARA 2,255.70 2,255.70 0% 0.00 100% 2,255.70 0% 0.00
02.03.08 SUMINISTRO Y ACCESORIOS DE FILTRO ANILLO 1,336.85 1,336.85 0% 0.00 100% 1,336.85 0% 0.00
02.03.09 SUMINISTRO Y COLOC. DE TAPA METALICO 0.85 x 0.75 588.53 588.53 0% 0.00 50% 294.27 50% 294.27
03 CAMARA ROMPE PRESION (02 UNID) 10,801.71 10,801.71 0% 0.00 0% 0.00 0% 0.00
03.01 TRABAJOS PRELIMINARES 6.19 6.19 0% 0.00 0% 0.00 0% 0.00
03.01.01 TRAZO Y REPLANTEO 6.19 6.19 100% 6.19 0% 0.00 0% 0.00
03.02 MOVIMIENTO DE TIERRAS 178.54 178.54 0% 0.00 0% 0.00 0% 0.00
03.02.01 EXCAVACION MANUAL EN TERRENO SUELTO 82.33 82.33 100% 82.33 0% 0.00 0% 0.00
03.02.02 ELIMINACION DE MATERIAL EXCEDENTE 96.21 96.21 100% 96.21 0% 0.00 0% 0.00
03.03 OBRAS DE CONCRETO 10,616.98 10,616.98 0% 0.00 0% 0.00 0% 0.00
03.03.01 SOLADO DE CONCRETO SIMPLE 197.46 197.46 0% 0.00 100% 197.46 0% 0.00
03.03.02 CONCRETO ARMADO F'C=175 KG/CM2. 2,757.03 2,757.03 0% 0.00 100% 2,757.03 0% 0.00
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL 1,317.06 1,317.06 0% 0.00 100% 1,317.06 0% 0.00
03.03.04 ACERO GRADO 60 1,602.10 1,602.10 0% 0.00 100% 1,602.10 0% 0.00
03.03.05 TARRAJEO CON IMPERMEABILIZANTES 646.89 646.89 0% 0.00 100% 646.89 0% 0.00
03.03.06 TARRAJEO CON CEMENTO-ARENA 743.56 743.56 0% 0.00 100% 743.56 0% 0.00
03.03.07 ACCESORIOS PARA CRP 4'' 2,389.76 2,389.76 0% 0.00 50% 1,194.88 50% 1,194.88
03.03.08 SUMINISTRO Y COLOC. DE TAPA METALICO 0.85 x 0.75 963.12 963.12 0% 0.00 50% 481.56 50% 481.56
04 LINEA DE CONDUCCION (2363.44 ML) 63,848.42 63,848.42 0% 0.00 0% 0.00 0% 0.00
04.01 TRABAJOS PRELIMINARES 2,740.24 2,740.24 0% 0.00 0% 0.00 0% 0.00
04.01.01 TRAZO Y REPLANTEO EN LINEA DE CONDUCCION 2,740.24 2,740.24 100% 2,740.24 0% 0.00 0% 0.00
04.02 MOVIMIENTO DE TIERRAS 15,817.87 15,817.87 0% 0.00 0% 0.00 0% 0.00
04.02.01 EXCAVACION MANUAL EN TERRENO SUELTO 10,179.07 10,179.07 0% 0.00 50% 5,089.54 50% 5,089.54
04.02.02 EXCAVACION DE ZANJA EN ROCA FIJA 5,638.80 5,638.80 0% 0.00 50% 2,819.40 50% 2,819.40
04.03 TENDIDO E INSTALACION DE TUBERIA 45,290.31 45,290.31 0% 0.00 0% 0.00 0% 0.00
04.03.01 REFINE NIVELACION Y COFINAMIENTO DE ZANJA 2,167.92 2,167.92 0% 0.00 50% 1,083.96 50% 1,083.96
04.03.02 COLOCACION Y COMPACTADO DE CAMA DE APOYO E = 0.10 M 14,122.76 14,122.76 0% 0.00 50% 7,061.38 50% 7,061.38
04.03.03 RELLENO DE ZANJAS CON MATERIAL PROPIO SELECCIONADO DE LA ZONA 5,329.91 5,329.91 0% 0.00 50% 2,664.96 50% 2,664.96
04.03.07 TUBERIA PVC SAP 2" C-7.5 4,904.29 4,904.29 0% 0.00 0% 0.00 100% 4,904.29
04.03.08 TUBERIA PVC SAP 1 1/2" C-7.5 10,465.00 10,465.00 0% 0.00 0% 0.00 100% 10,465.00
04.03.09 TUBERIA PVC SAP 1" C-7.5 5,183.40 5,183.40 0% 0.00 0% 0.00 100% 5,183.40
04.03.10 ACCESORIOS COMPLEMENTARIOS A LA RED - Pucapuca 2,153.43 2,153.43 0% 0.00 0% 0.00 100% 2,153.43
04.03.11 PRUEBA HIDRAULICA 963.60 963.60 0% 0.00 0% 0.00 100% 963.60
05 LINEA DE DISTRIBUCION (1756.96 ML) 28,460.38 28,460.38 0% 0.00 0% 0.00 0% 0.00
05.01 TRABAJOS PRELIMINARES 1,715.09 1,715.09 0% 0.00 0% 0.00 0% 0.00
05.01.01 TRAZO Y REPLANTEO EN LINEA DE DISTRIBUCION 1,715.09 1,715.09 100% 1,715.09 0% 0.00 0% 0.00
05.02 MOVIMIENTO DE TIERRAS 17,885.89 17,885.89 0% 0.00 0% 0.00 0% 0.00
05.02.01 EXCAVACION MANUAL EN TERRENO SUELTO P/ ZANJA 6,088.36 6,088.36 0% 0.00 0% 0.00 0% 0.00
05.02.02 REFINE NIVELACION Y COFINAMIENTO DE ZANJA 1,356.99 1,356.99 0% 0.00 50% 3,044.18 50% 3,044.18
05.02.03 COLOCACION Y COMPACTADO DE CAMA DE APOYO E = 0.10 M 8,839.29 8,839.29 0% 0.00 50% 678.50 50% 678.50
05.02.04 RELLENO DE ZANJAS CON MATERIAL PROPIO SELECCIONADO DE LA ZONA 1,601.25 1,601.25 0% 0.00 0% 0.00 100% 8,839.29
05.03 TUBERIA 8,859.40 8,859.40 0% 0.00 0% 0.00 0% 0.00
05.03.01 TUBERIA PVC SAP 3/4" C-10 8,066.56 8,066.56 0% 0.00 0% 0.00 100% 8,066.56
05.03.02 ACCESORIOS COMPLEMENTARIOS A LA RED DE DISTRIBUCION 189.73 189.73 0% 0.00 0% 0.00 100% 189.73
05.03.03 PRUEBA HIDRAULICA 603.11 603.11 0% 0.00 0% 0.00 100% 603.11
06 VALVULAS DE PURGA Y CONTROL 5,127.66 5,127.66 0% 0.00 0% 0.00 0% 0.00
06.01 TRABAJOS PRELIMINARES 1.09 1.09 0% 0.00 0% 0.00 0% 0.00
06.01.01 TRAZO Y REPLANTEO 1.09 1.09 100% 1.09 0% 0.00 0% 0.00
06.02 MOVIMIENTO DE TIERRAS 12.07 12.07 0% 0.00 0% 0.00 0% 0.00
06.02.01 EXCAVACION PARA EXTRUCTURAS 7.40 7.40 0% 0.00 0% 0.00 100% 7.40
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE 4.67 4.67 0% 0.00 0% 0.00 100% 4.67
06.03 VALVULAS DE PURGA Y CONTROL 5,114.50 5,114.50 0% 0.00 0% 0.00 0% 0.00
06.03.01 CAJA DE VALVULA DE 0.50 x 0.50 CON TAPA METALICA 1,486.80 1,486.80 0% 0.00 0% 0.00 100% 1,486.80
06.03.02 VALVULA DE PURGA ø 1 1/2" 2,237.92 2,237.92 0% 0.00 0% 0.00 100% 2,237.92
06.03.03 VALVULA DE CONTROL ø 4" 1,389.78 1,389.78 0% 0.00 0% 0.00 100% 1,389.78
07 HIDRANTES 25,532.69 25,532.69 0% 0.00 0% 0.00 0% 0.00
07.01 HIDRANTES (52 UNID) 12,398.59 12,398.59 0% 0.00 0% 0.00 0% 0.00
07.01.01 CAJA DE HIDRANTE DE 0.40 x 0.40 CON TAPA METALICA 7,766.17 7,766.17 0% 0.00 40% 3,106.47 60% 4,659.70
07.01.02 HIDRANTES DE ø 3/4" + Accesorios 3,789.57 3,789.57 0% 0.00 40% 1,515.83 60% 2,273.74
07.01.03 ACCESORIOS COMPLEMENTARIOS A LA RED - Pucapuca 842.85 842.85 0% 0.00 40% 337.14 60% 505.71
07.02 EQUIPO DE RIEGO 13,134.10 13,134.10 0% 0.00 0% 0.00 0% 0.00
07.02.01 EQUIPO DE RIEGO FAMILIAR - Aspersor Sect. Q=1.18m3/h 2,529.00 2,529.00 0% 0.00 0% 0.00 100% 2,529.00
07.02.02 EQUIPO DE RIEGO FAMILIAR - Aspersor Sect. Q=0.50m3/h 4,653.10 4,653.10 0% 0.00 0% 0.00 100% 4,653.10
07.02.03 EQUIPO DE RIEGO FAMILIAR - Aspersor Sect. Q=0.24m3/h 5,952.00 5,952.00 0% 0.00 0% 0.00 100% 5,952.00
08 TRANSPORTE DE MATERIALES 6,000.00 6,000.00 0% 0.00 0% 0.00 0% 0.00
08.01 TRANSPORTE RURAL 1,000.00 1,000.00 40% 400.00 30% 300.00 30% 300.00
08.02 TRANSPORTE DE MATERIALES - ABANCAY A OBRA 5,000.00 5,000.00 40% 2,000.00 30% 1,500.00 30% 1,500.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL COSTO DIRECTO 156,988.26 156,988.26 0.00 9,211.70 0.00 52,894.47 0.00 94,882.09
CAPACITACION Y MITIGACION 9,458.80 9,458.80 0.00 3,152.93 0.00 3,152.93 0.00 3,152.93
GASTOS GENERALES (17.40%) 28,969.00 28,969.00 0.00 9,656.33 0.00 9,656.33 0.00 9,656.33
GASTOS DE SUPERVISION (4.53%) 7,532.00 7,532.00 0.00 2,510.67 0.00 2,510.67 0.00 2,510.67
UTILIDAD (10%) 16,644.71 16,644.71 0.00 5,548.24 0.00 5,548.24 0.00 5,548.24
TOTAL PRESUPUESTO DE OBRA 219,592.77 219,592.77 0.00 30,079.87 0.00 73,762.63 0.00 115,750.26
CRONOGRAMA DE EJECUCION FINANCIERO
PROYECTO: INSTALACION DEL SISTEMA DE RIEGO POR ASPERSION EN EL SECTOR CONCHARUMIYOC - ANCATIYANA, LOCALIDAD DE PUCA PUCA, DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY - APURIMAC
SECTOR CONCHARUMIYOC - ANCATIYANA

COSTO MES 1 MES 2 MES 3


SUB SISTEMAS
ITEM TOTAL FINANC. FINANC. FINANC.
DESCRIPCION
CONCHARUMIYOC FISICO FISICO FISICO
S/. S/. S/. S/.
ANCATIYANA

01 OBRAS PRELIMINARES 1,815.00 1,815.00


01.01 CARTEL DE OBRA EN BANNER 550.00 550.00 100% 550.00
01.02 CONSTRUCCION DE CAMPAMENTO 1,265.00 1,265.00 100% 1,265.00
02 CAMARA DE CARGA (02 UNID) 15,402.40 15,402.40
02.01 TRABAJOS PRELIMINARES 8.91 8.91
02.01.01 TRAZO Y REPLANTEO 8.91 8.91 100% 8.91
02.02 MOVIMIENTO DE TIERRAS 346.64 346.64
02.02.01 EXCAVACION MANUAL EN TERRENO SUELTO 159.82 159.82 100% 159.82
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE 186.82 186.82 100% 186.82
02.03 OBRAS DE CONCRETO 15,046.85 15,046.85
02.03.01 SOLADO DE CONCRETO 2" MEZCLA 1:12 C-H 222.36 222.36 100% 222.36
02.03.02 CONCRETO ARMADO F'C=175 KG/CM2. 4,475.70 4,475.70 100% 4,475.70
02.03.03 ENCOFRADO Y DESENCOFRADO NORMAL 1,977.73 1,977.73 100% 1,977.73
02.03.04 ACERO GRADO 60 2,206.18 2,206.18 100% 2,206.18
02.03.05 TARRAJEO CON CEMENTO-ARENA 983.61 983.61 100% 983.61
02.03.06 TARRAJEO CON IMPERMEABILIZANTES 1,000.19 1,000.19 100% 1,000.19
02.03.07 SUMINISTRO Y COLOC. DE ACCESORIOS Y VALVULAS 4" - CAMARA 2,255.70 2,255.70 100% 2,255.70
02.03.08 SUMINISTRO Y ACCESORIOS DE FILTRO ANILLO 1,336.85 1,336.85 100% 1,336.85
02.03.09 SUMINISTRO Y COLOC. DE TAPA METALICO 0.85 x 0.75 588.53 588.53 50% 294.27 50% 294.27
03 CAMARA ROMPE PRESION (02 UNID) 10,801.71 10,801.71
03.01 TRABAJOS PRELIMINARES 6.19 6.19
03.01.01 TRAZO Y REPLANTEO 6.19 6.19 100% 6.19
03.02 MOVIMIENTO DE TIERRAS 178.54 178.54
03.02.01 EXCAVACION MANUAL EN TERRENO SUELTO 82.33 82.33 100% 82.33
03.02.02 ELIMINACION DE MATERIAL EXCEDENTE 96.21 96.21 100% 96.21
03.03 OBRAS DE CONCRETO 10,616.98 10,616.98
03.03.01 SOLADO DE CONCRETO SIMPLE 197.46 197.46 100% 197.46
03.03.02 CONCRETO ARMADO F'C=175 KG/CM2. 2,757.03 2,757.03 100% 2,757.03
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL 1,317.06 1,317.06 100% 1,317.06
03.03.04 ACERO GRADO 60 1,602.10 1,602.10 100% 1,602.10
03.03.05 TARRAJEO CON IMPERMEABILIZANTES 646.89 646.89 100% 646.89
03.03.06 TARRAJEO CON CEMENTO-ARENA 743.56 743.56 100% 743.56
03.03.07 ACCESORIOS PARA CRP 4'' 2,389.76 2,389.76 50% 1,194.88 50% 1,194.88
03.03.08 SUMINISTRO Y COLOC. DE TAPA METALICO 0.85 x 0.75 963.12 963.12 50% 481.56 50% 481.56
04 LINEA DE CONDUCCION (2363.44 ML) 63,848.42 63,848.42
04.01 TRABAJOS PRELIMINARES 2,740.24 2,740.24
04.01.01 TRAZO Y REPLANTEO EN LINEA DE CONDUCCION 2,740.24 2,740.24 100% 2,740.24
04.02 MOVIMIENTO DE TIERRAS 15,817.87 15,817.87
04.02.01 EXCAVACION MANUAL EN TERRENO SUELTO 10,179.07 10,179.07 50% 5,089.54 50% 5,089.54
04.02.02 EXCAVACION DE ZANJA EN ROCA FIJA 5,638.80 5,638.80 50% 2,819.40 50% 2,819.40
04.03 TENDIDO E INSTALACION DE TUBERIA 45,290.31 45,290.31
04.03.01 REFINE NIVELACION Y COFINAMIENTO DE ZANJA 2,167.92 2,167.92 50% 1,083.96 50% 1,083.96
04.03.02 COLOCACION Y COMPACTADO DE CAMA DE APOYO E = 0.10 M 14,122.76 14,122.76 50% 7,061.38 50% 7,061.38
04.03.03 RELLENO DE ZANJAS CON MATERIAL PROPIO SELECCIONADO DE LA ZONA 5,329.91 5,329.91 50% 2,664.96 50% 2,664.96
04.03.07 TUBERIA PVC SAP 2" C-7.5 4,904.29 4,904.29 100% 4,904.29
04.03.08 TUBERIA PVC SAP 1 1/2" C-7.5 10,465.00 10,465.00 100% 10,465.00
04.03.09 TUBERIA PVC SAP 1" C-7.5 5,183.40 5,183.40 100% 5,183.40
04.03.10 ACCESORIOS COMPLEMENTARIOS A LA RED - Pucapuca 2,153.43 2,153.43 100% 2,153.43
04.03.11 PRUEBA HIDRAULICA 963.60 963.60 100% 963.60
05 LINEA DE DISTRIBUCION (1756.96 ML) 28,460.38 28,460.38
05.01 TRABAJOS PRELIMINARES 1,715.09 1,715.09
05.01.01 TRAZO Y REPLANTEO EN LINEA DE DISTRIBUCION 1,715.09 1,715.09 100% 1,715.09
05.02 MOVIMIENTO DE TIERRAS 17,885.89 17,885.89
05.02.01 EXCAVACION MANUAL EN TERRENO SUELTO P/ ZANJA 6,088.36 6,088.36 50% 3,044.18 50% 3,044.18
05.02.02 REFINE NIVELACION Y COFINAMIENTO DE ZANJA 1,356.99 1,356.99 50% 678.50 50% 678.50
05.02.03 COLOCACION Y COMPACTADO DE CAMA DE APOYO E = 0.10 M 8,839.29 8,839.29 100% 8,839.29
05.02.04 RELLENO DE ZANJAS CON MATERIAL PROPIO SELECCIONADO DE LA ZONA 1,601.25 1,601.25 100% 1,601.25
05.03 TUBERIA 8,859.40 8,859.40
05.03.01 TUBERIA PVC SAP 3/4" C-10 8,066.56 8,066.56 100% 8,066.56
05.03.02 ACCESORIOS COMPLEMENTARIOS A LA RED DE DISTRIBUCION 189.73 189.73 100% 189.73
05.03.03 PRUEBA HIDRAULICA 603.11 603.11 100% 603.11
06 VALVULAS DE PURGA Y CONTROL 5,127.66 5,127.66
06.01 TRABAJOS PRELIMINARES 1.09 1.09
06.01.01 TRAZO Y REPLANTEO 1.09 1.09 100% 1.09
06.02 MOVIMIENTO DE TIERRAS 12.07 12.07
06.02.01 EXCAVACION PARA EXTRUCTURAS 7.40 7.40 100% 7.40
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE 4.67 4.67 100% 4.67
06.03 VALVULAS DE PURGA Y CONTROL 5,114.50 5,114.50
06.03.01 CAJA DE VALVULA DE 0.50 x 0.50 CON TAPA METALICA 1,486.80 1,486.80 100% 1,486.80
06.03.02 VALVULA DE PURGA ø 1 1/2" 2,237.92 2,237.92 100% 2,237.92
06.03.03 VALVULA DE CONTROL ø 4" 1,389.78 1,389.78 100% 1,389.78
07 HIDRANTES 25,532.69 25,532.69
07.01 HIDRANTES (52 UNID) 12,398.59 12,398.59
07.01.01 CAJA DE HIDRANTE DE 0.40 x 0.40 CON TAPA METALICA 7,766.17 7,766.17 40% 3,106.47 60% 4,659.70
07.01.02 HIDRANTES DE ø 3/4" + Accesorios 3,789.57 3,789.57 40% 1,515.83 60% 2,273.74
07.01.03 ACCESORIOS COMPLEMENTARIOS A LA RED - Pucapuca 842.85 842.85 40% 337.14 60% 505.71
07.02 EQUIPO DE RIEGO 13,134.10 13,134.10
07.02.01 EQUIPO DE RIEGO FAMILIAR - Aspersor Sect. Q=1.18m3/h 2,529.00 2,529.00 100% 2,529.00
07.02.02 EQUIPO DE RIEGO FAMILIAR - Aspersor Sect. Q=0.50m3/h 4,653.10 4,653.10 100% 4,653.10
07.02.03 EQUIPO DE RIEGO FAMILIAR - Aspersor Sect. Q=0.24m3/h 5,952.00 5,952.00 100% 5,952.00
08 TRANSPORTE DE MATERIALES 6,000.00 6,000.00
08.01 TRANSPORTE RURAL 1,000.00 1,000.00 40% 400.00 30% 300.00 30% 300.00
08.02 TRANSPORTE DE MATERIALES - ABANCAY A OBRA 5,000.00 5,000.00 40% 2,000.00 30% 1,500.00 30% 1,500.00

TOTAL COSTO DIRECTO 156,988.26 156,988.26 9,211.70 52,894.47 94,882.09

CAPACITACION Y MITIGACION 9,458.80 9,458.80 3,152.93 3,152.93 3,152.93

GASTOS GENERALES (17.40%) 28,969.00 28,969.00 9,656.33 9,656.33 9,656.33

GASTOS DE SUPERVISION (4.53%) 7,532.00 7,532.00 2,510.67 2,510.67 2,510.67

UTILIDAD (10%) 16,644.71 16,644.71 5,548.24 5,548.24 5,548.24

TOTAL PRESUPUESTO DE OBRA 219,592.77 219,592.77 ### 0.00 73,762.63 0.00 115,750.26