Documentos de Académico
Documentos de Profesional
Documentos de Cultura
$/año
Mano de obra 70,434
Materiales oficina 6,000
Perforación Pack Sack 56,000
Otros costos 12,232
Total 144,666
Ensayes
Producto TMSD Ag Oz/Tc Cu % Pb %
Conc. Ag-Pb 15.05 66.00 4.01 49.50
Conc. Zinc 30.52 10.69 0.79 1.19
Relave 304.43 1.11 0.08 0.59
Cabeza calc. 350.00 4.73 0.31 2.74
SUB TOTAL
Otros(25%)
TOTAL GENERAL
DE EQUIPOS
Precio Unit. Costo total
48,600.00 $ 48,600.00
39,000.00 $ 39,000.00
244,500.00 $ 244,500.00
640,000.00 $ 640,000.00
62,000.00 $ 124,000.00
$ 1,096,100.00
1,834,500.00 $ 1,834,500.00
8,530.00 $ 34,120.00
$ 1,868,620.00
19,500.00 $ 19,500.00
14,800.00 $ 29,600.00
47,100.00 $ 188,400.00
47,100.00 $ 188,400.00
23,400.00 $ 93,600.00
47,100.00 $ 188,400.00
47,100.00 $ 188,400.00
23,400.00 $ 93,600.00
16,500.00 $ 16,500.00
47,100.00 $ 188,400.00
47,100.00 $ 188,400.00
23,400.00 $ 93,600.00
S $ 1,476,800.00
98,500.00 $ 98,500.00
155,000.00 $ 155,000.00
230,000.00 $ 230,000.00
$ 483,500.00
178,600.00 $ 178,600.00
235,900.00 $ 235,900.00
$ 414,500.00
$ 5,339,520.00
$ 1,334,880.00
$ 6,674,400.00
Nº Cargo Jornal diario Mensual S/.
1 Ing. Jefe de Planta 240,000
3 Ing. Jefes de guardia 480,000
1 Ing. Jefe de Laboratorio 160,000
1 Secretario 110,000
3 Alimentadores de tolva de gruesos 1155 103,950
3 Operadores de tolva de gruesos 1350 121,500
2 Chancadores tolva de finos 1350 81,000
3 Molineros 1450 130,500
3 Flotadores circuito de plomo 1350 121,500
3 Flotadores circuito de zinc 1350 121,500
2 Filtreros 1350 81,000
2 Ensacadores de concentrado 1150 69,000
2 Reactivistas 1350 81,000
4 Relaveros 1150 138,000
3 Muestreros 1450 130,500
4 Preparadores de muestras 1350 162,000
2 Ensayadores 1700 102,000
Sub - Total 2,433,450
Leyes Sociales 100%
TOTAL
Costo anual S/.
2,880,000
5,760,000
1,920,000
1,320,000
1,247,400
1,458,000
972,000
1,566,000
1,458,000
1,458,000
972,000
828,000
972,000
1,656,000
1,566,000
1,944,000
1,224,000
29,201,400
29,190,000
58,391,400
Costo Unitario US$/TM
U.S. $
Planta Concentradora 2,080,065
Energía 765,487
Servicios Auxiliares 452,600
Obras Civiles 2,587,453
TOTAL 5,885,605
US$/TM Costo Anual US$.
126000
664,020
808,920
221,760
108,360
1,803,060
Planta Concentradora
Energía
Servicios Auxiliares
Obras Civiles
SUB-TOTAL
Capital de Trabajo
Imprevistos
Escalamiento
TOTAL
% TOTAL U.S. $
27.47 2,080,065
10.11 765,487
5.98 452,600
34.18 2,587,453
5,885,605 7,571,133
12.01 909,317 7,571,133
3.89 294,280 7,571,133
6.35 480,798 7,571,133
99.99 7,570,000 7,571,133
7,571,133
7,571,133
7,571,133
7,571,133
7,571,133
7,571,133
Escenario Pesimista Escenario probable
Plata U.S. $/Oz 11.00 15.00
Plomo U.S. $/lb 0.38 0.40
Cobre U.S. $/lb. 0.85 0.90
Zinc U.S. $/lb 0.35 0.40
3,653,808
US $ %
M.E. US$ US$ Aporte Propio 1,553,808 20.52 %
746,192 2,300,000 Préstamo 5,270,000 69.61 %
Inversión 7,570,000 100%
2,100,000
98,000 98,000
3,072,000 3,072,000
3,916,192 570
3,916,192 7,570,000
Intereses %
Moneda Nacional 1,553,808 20.52 %
Moneda Extranjera 5,270,000 69.61 %
Inversión 7,570,000 100%
AÑO INGRESO Y VALOR RESIDUAL INVERSIONES COSTOS BENEFICIO NETO
(6´637.4)
4,068.6
4,325.6
3,876.9
3,348.5
4,934.6
11,774.8
TIRF Escenario Pesimista 28.4%
TIRF Escenario probable 96.2%
TIRF Escenario optimista 186.5%
Aporte Propio
Préstamo
Inversión
Año 0 Año 1 Año 2 Año 3
Ventas 0 9,341,640 9,341,640 9,341,640
Gastos financieros -7.570.000 1,669,465 1,669,465 1,669,465
Gastos de producción 0 1,803,060 1,803,060 1,803,060
Impuesto 15% 0 2,491,300 3,321,700 3,321,700
Utilidad neta -7.570.000 15,305,465 16,135,865 16,135,865
15,305,465
Año 4 Año 5 Año 6 - 10
9,341,640 9,341,640 46,708,200
1,669,465 1,669,465 -
1,803,060 1,803,060 9,015,300
3,321,700 3,321,700 16,608,500
16,135,865 16,135,865 72,332,000