03.02.00 DEMOLICIONES
03.02.01 DEMOLICION DE LOSA DE C°S° E=0.15M CON CORTADORA DE CONCRETO 41.71 M2
EJE 1-1: ENTRE A-B 3.90 0.15 1.00 0.59
EJE 1-1: ENTRE B-C 3.90 0.15 1.00 0.59
EJE 1-1: ENTRE C-D 3.90 0.15 1.00 0.59
EJE 1-1: ENTRE D-E 3.90 0.15 1.00 0.59
EJE 1-1: ENTRE E-F 3.90 0.15 1.00 0.59
EJE 1-1: ENTRE F-G 3.90 0.15 1.00 0.59
EJE 1-1: ENTRE G-H 3.90 0.15 1.00 0.59
EJE 1-1: ENTRE H-I 3.90 0.15 1.00 0.59
EJE 1-1: ENTRE I-J 3.90 0.15 1.00 0.59
lccmarco BLOQUE 02 1
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 0.15 1.00 0.58
SSHH 1.95 0.15 1.00 0.29
ENTRE EJE B-C: ENTRE 2-4 2.30 0.15 1.00 0.35
ENTRE EJE B-C: ENTRE 4-5 2.60 0.15 1.00 0.39
ENTRE EJE B-C: ENTRE 5-8 4.85 0.15 1.00 0.73
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 0.15 1.00 0.58
SSHH 1.95 0.15 1.00 0.29
lccmarco BLOQUE 02 2
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE 4-5: ENTRE A-B 3.00 0.15 0.15 1.00 0.07
ENTRE EJE 5-6: ENTRE A-B 3.00 0.15 0.15 1.00 0.07
ENTRE EJE 5-6: ENTRE D-E 0.80 0.15 0.15 1.00 0.02
ENTRE EJE 6-7: ENTRE A-B 3.00 0.15 0.15 1.00 0.07
ENTRE EJE 7-8: ENTRE A-B 3.90 0.15 0.15 1.00 0.09
ENTRE EJE 7-8: ENTRE B-D 3.37 0.15 0.15 1.00 0.08
lccmarco BLOQUE 02 3
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE A-B: ENTRE 1-2 3.85 0.15 0.15 1.00 0.09
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 0.15 0.15 1.00 0.09
SSHH 1.95 0.15 0.15 1.00 0.04
ENTRE EJE B-C: ENTRE 2-4 2.30 0.15 0.15 1.00 0.05
ENTRE EJE B-C: ENTRE 4-5 2.60 0.15 0.15 1.00 0.06
ENTRE EJE B-C: ENTRE 5-8 4.85 0.15 0.15 1.00 0.11
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 0.15 0.15 1.00 0.09
SSHH 1.95 0.15 0.15 1.00 0.04
03.03.00 ESTRUCTURAS
03.03.01 MOVIMIENTO DE TIERRAS
03.03.01.01 EXCAVACIÓNES PARA SOBRECIMIENTO 23.46 M3
EJE 1-1: ENTRE A-B 3.90 0.15 0.15 1.00 0.09
EJE 1-1: ENTRE B-C 3.90 0.15 0.15 1.00 0.09
EJE 1-1: ENTRE C-D 3.90 0.15 0.15 1.00 0.09
EJE 1-1: ENTRE D-E 3.90 0.15 0.15 1.00 0.09
EJE 1-1: ENTRE E-F 3.90 0.15 0.15 1.00 0.09
EJE 1-1: ENTRE F-G 3.90 0.15 0.15 1.00 0.09
EJE 1-1: ENTRE G-H 3.90 0.15 0.15 1.00 0.09
EJE 1-1: ENTRE H-I 3.90 0.15 0.15 1.00 0.09
EJE 1-1: ENTRE I-J 3.90 0.15 0.15 1.00 0.09
lccmarco BLOQUE 02 4
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE 4-5: ENTRE A-B 3.00 0.15 0.05 1.00 0.02
ENTRE EJE 5-6: ENTRE A-B 3.00 0.15 0.05 1.00 0.02
ENTRE EJE 5-6: ENTRE D-E 0.80 0.15 0.05 1.00 0.01
ENTRE EJE 6-7: ENTRE A-B 3.00 0.15 0.05 1.00 0.02
ENTRE EJE 7-8: ENTRE A-B 3.90 0.15 0.05 1.00 0.03
ENTRE EJE 7-8: ENTRE B-D 3.37 0.15 0.05 1.00 0.03
lccmarco BLOQUE 02 5
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE A-B: ENTRE 1-2 3.85 0.15 0.05 1.00 0.03
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 0.15 0.05 1.00 0.03
SSHH 1.95 0.15 0.05 1.00 0.01
ENTRE EJE B-C: ENTRE 2-4 2.30 0.15 0.05 1.00 0.02
ENTRE EJE B-C: ENTRE 4-5 2.60 0.15 0.05 1.00 0.02
ENTRE EJE B-C: ENTRE 5-8 4.85 0.15 0.05 1.00 0.04
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 0.15 0.05 1.00 0.03
SSHH 1.95 0.15 0.05 1.00 0.01
lccmarco BLOQUE 02 6
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE 4-5: ENTRE A-B 3.00 0.15 0.50 1.00 0.23
ENTRE EJE 5-6: ENTRE A-B 3.00 0.15 0.50 1.00 0.23
ENTRE EJE 5-6: ENTRE D-E 0.80 0.15 0.50 1.00 0.06
ENTRE EJE 6-7: ENTRE A-B 3.00 0.15 0.50 1.00 0.23
ENTRE EJE 7-8: ENTRE A-B 3.90 0.15 0.50 1.00 0.29
ENTRE EJE 7-8: ENTRE B-D 3.37 0.15 0.50 1.00 0.25
lccmarco BLOQUE 02 7
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE A-B: ENTRE 1-2 3.85 0.15 0.50 1.00 0.29
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 0.15 0.50 1.00 0.29
SSHH 1.95 0.15 0.50 1.00 0.15
ENTRE EJE B-C: ENTRE 2-4 2.30 0.15 0.50 1.00 0.17
ENTRE EJE B-C: ENTRE 4-5 2.60 0.15 0.50 1.00 0.20
ENTRE EJE B-C: ENTRE 5-8 4.85 0.15 0.50 1.00 0.36
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 0.15 0.50 1.00 0.29
SSHH 1.95 0.15 0.50 1.00 0.15
lccmarco BLOQUE 02 8
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
lccmarco BLOQUE 02 9
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 0.30 2.00 2.31
SSHH 1.95 0.30 2.00 1.17
ENTRE EJE B-C: ENTRE 2-4 2.30 0.30 2.00 1.38
ENTRE EJE B-C: ENTRE 4-5 2.60 0.30 2.00 1.56
ENTRE EJE B-C: ENTRE 5-8 4.85 0.30 2.00 2.91
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 0.30 2.00 2.31
SSHH 1.95 0.30 2.00 1.17
MUEBLE TIPO 2
APOYOS 0.60 0.10 1.00 4.00 0.24
LOSA 2.73 0.60 0.10 1.00 0.16
LAVAT 1.18 0.48 0.10 -1.00 -0.06
MUEBLE TIPO 1
APOYOS 1.40 1.00 4.00 5.60
LOSA 4.90 0.10 2.00 0.98
LAVAT 3.32 0.48 0.10 2.00 0.32
MUEBLE TIPO 2
APOYOS 1.40 1.00 4.00 5.60
LOSA 6.66 0.10 1.00 0.67
LAVAT 3.32 0.48 0.10 1.00 0.16
lccmarco BLOQUE 02 10
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.03.04 VEREDAS
03.03.04.01 VEREDAS. ENCOFRADO Y DESENCOFRADO 18.68 M2
VEREDAS laterales 37.60 0.15 2.00 11.28
fondo 24.00 0.15 1.00 3.60
fachada 25.30 0.15 1.00 3.80
03.03.04.04 VEREDAS, SELLADO DE JUNTAS CON POLIURETANO e= 6mm (Altura = h/3) 47.10 M
cada 3 metros laterales 0.60 26.00 15.60
fondo 1.50 9.00 13.50
fachada 2.00 9.00 18.00
03.04.00 ARQUITECTURA
03.04.01 MUROS Y TABIQUES
03.04.01.01 MURO DE SOGA CON LADRILLO KING KONG 9x13x24cm 195.36 M2
EJE 1-1: ENTRE A-B 3.90 0.70 1.00 2.73
EJE 1-1: ENTRE B-C 3.90 0.70 1.00 2.73
EJE 1-1: ENTRE C-D 3.90 0.70 1.00 2.73
EJE 1-1: ENTRE D-E 3.90 0.70 1.00 2.73
EJE 1-1: ENTRE E-F 3.90 0.70 1.00 2.73
EJE 1-1: ENTRE F-G 3.90 0.70 1.00 2.73
EJE 1-1: ENTRE G-H 3.90 0.70 1.00 2.73
EJE 1-1: ENTRE H-I 3.90 0.70 1.00 2.73
EJE 1-1: ENTRE I-J 3.90 0.70 1.00 2.73
lccmarco BLOQUE 02 11
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 0.70 1.00 2.70
SSHH 1.95 0.70 1.00 1.37
ENTRE EJE B-C: ENTRE 2-4 2.30 0.70 1.00 1.61
ENTRE EJE B-C: ENTRE 4-5 2.60 0.70 1.00 1.82
ENTRE EJE B-C: ENTRE 5-8 4.85 0.70 1.00 3.40
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 0.70 1.00 2.70
SSHH 1.95 0.70 1.00 1.37
lccmarco BLOQUE 02 12
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
lccmarco BLOQUE 02 13
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 2.50 1.00 9.63
SSHH 1.95 2.50 1.00 4.88
ENTRE EJE B-C: ENTRE 2-4 2.30 2.50 1.00 5.75
ENTRE EJE B-C: ENTRE 4-5 2.60 2.50 1.00 6.50
ENTRE EJE B-C: ENTRE 5-8 4.85 2.50 1.00 12.13
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 2.50 1.00 9.63
SSHH 1.95 2.50 1.00 4.88
lccmarco BLOQUE 02 14
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
lccmarco BLOQUE 02 15
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 2.50 1.00 9.63
SSHH 1.95 2.50 1.00 4.88
ENTRE EJE B-C: ENTRE 2-4 2.30 2.50 1.00 5.75
ENTRE EJE B-C: ENTRE 4-5 2.60 2.50 1.00 6.50
ENTRE EJE B-C: ENTRE 5-8 4.85 2.50 1.00 12.13
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 2.50 1.00 9.63
SSHH 1.95 2.50 1.00 4.88
lccmarco BLOQUE 02 16
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
lccmarco BLOQUE 02 17
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 1.00 2.00 7.70
SSHH 1.95 1.00 2.00 3.90
ENTRE EJE B-C: ENTRE 2-4 2.30 1.00 2.00 4.60
ENTRE EJE B-C: ENTRE 4-5 2.60 1.00 2.00 5.20
ENTRE EJE B-C: ENTRE 5-8 4.85 1.00 2.00 9.70
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 1.00 2.00 7.70
SSHH 1.95 1.00 2.00 3.90
lccmarco BLOQUE 02 18
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.04.03 CIELORRASO
03.04.03.01 CIELORASO DE PVC (INCLUYE CORREA METALICA DE PERFIL OMEGA (40 x 18' x 10 x 68 x 0.45 x 3m) 941.13 M2
Bloque 2: Losa 36.10 24.00 1.00 866.40
Area de Muros -41.71 -41.71
ALERO LATERAL 36.00 1.10 2.00 79.20
lccmarco BLOQUE 02 19
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
lccmarco BLOQUE 02 20
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
lccmarco BLOQUE 02 21
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 1.00 2.00 7.70
SSHH 1.95 1.00 2.00 3.90
ENTRE EJE B-C: ENTRE 2-4 2.30 1.00 2.00 4.60
ENTRE EJE B-C: ENTRE 4-5 2.60 1.00 2.00 5.20
ENTRE EJE B-C: ENTRE 5-8 4.85 1.00 2.00 9.70
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 1.00 2.00 7.70
SSHH 1.95 1.00 2.00 3.90
03.04.06.02 PUERTA DE VIDRIO TEMPLADO LAMINADO DE 6mm. CON ESTRUCTURA DE PERFILERIA DE ALUMINIO (P-02: 1.00x2.40) (I 19.00 UND
ALMACEN INTERMEDIO DE RRSS 100 1.00 1.00
HALL PARA BOTADERO 101 2.00 2.00
CUARTO DE LIMPIEZA 109 2.00 2.00
REPOSTERO - INGRESO DE ALIMENTOS 110 1.00 1.00
COCHE DE COMIDA 111 1.00 1.00
SSHH PACIENTES MUJERES 112 1.00 1.00
TRATAMIENTO DE MEDICAMENTOS 115 2.00 2.00
ESTACION DE MEDICOS 116 1.00 1.00
ESTACION DE ENFERMERAS 117 1.00 1.00
SSHH PACIENTES VARONES 118 1.00 1.00
ALMACEN DE ROPA ESTERIL 119 1.00 1.00
ALMACEN DE EQUIPOS E INSTRUMENTOS 120 1.00 1.00
ALMACEN DE MEDICAMENTOS 121 1.00 1.00
lccmarco BLOQUE 02 22
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.04.06.03 PUERTA DE VIDRIO TEMPLADO LAMINADO DE 6mm. CON ESTRUCTURA DE PERFILERIA DE ALUMINIO (P-03: 0.90x2.40) (I 5.00 UND
VSESTUARIO DE HOMBRES 104 1.00 1.00
COLOCACION DE EPPs 105 1.00 1.00
COLOCACION DE EPPs 107 1.00 1.00
VESTUARIO DE MUJERES 108 2.00 2.00
03.04.06.04 PUERTA DE VIDRIO TEMPLADO LAMINADO DE 6mm. CON ESTRUCTURA DE PERFILERIA DE ALUMINIO (P-04: 0.80x2.40) (I 8.00 UND
SSHH PACIENTES VARONES 118 2.00 2.00
SSHH PACIENTES MUJERES 112 2.00 2.00
DUCHAS PERSONAL TECNICO 125 4.00 4.00
03.04.06.05 PUERTA DE VIDRIO TEMPLADO LAMINADO DE 6mm. CON ESTRUCTURA DE PERFILERIA DE ALUMINIO (P-05: 1.20x2.40) (I 1.00 UND
SALIDA A LAVA PIES, ESTACION DE ENFERMERAS 1.00 1.00
03.04.06.06 PUERTA DE MELANINE e= 18mm. 01 HOJA CON MARCO DE TUBO DE ALUMINIO DE 1 1/2" x 1 1/2" x 1mm (P-06: 0.80x1.66) ( 8.00 UND
SSHH PACIENTES VARONES 118 2.00 2.00
SSHH PACIENTES MUJERES 112 2.00 2.00
INODOROS PERSONAL TECNICO 125 4.00 4.00
03.04.06.07 VENTANA FIJA (TIPO 01) INCLUYE MARCO DE ALUMINIO e= 8mm 31.00 UND
ALMACEN INTERMEDIO 100 1.00 1.00
BOTADERO 102 1.00 1.00
COLOCACION DE EPPs 105 1.00 1.00
COLOCACION DE EPPs 107 1.00 1.00
CUARTO DE LIMPIEZA 109 1.00 1.00
REPOSTERO 110 2.00 2.00
COCHE DE COMIDA 111 1.00 1.00
SALA DE INTERNAMIENTO PARA MUJERES 113 11.00 11.00
SALA DE INTERNAMIENTO PARA VARONES 114 10.00 10.00
ESTACION DE ENFERMERAS 117 1.00 1.00
TRATAMIENTO DE MEDICAMENTOS 115 1.00 1.00
03.04.06.08 VENTANA FIJA (TIPO 02) INCLUYE MARCO DE ALUMINIO e= 8mm 5.00 UND
SSHH PACIENTES VARONES 118 2.00 2.00
SSHH PACIENTES MUJERES 112 2.00 2.00
INODOROS PERSONAL TECNICO 125 1.00 1.00
03.04.07 PINTURA
03.04.07.01 PINTADO DE MURO INTERIOR OLEO MATE 1,226.64 M2
EJE 1-1: ENTRE A-B 3.90 2.50 1.00 9.75
EJE 1-1: ENTRE B-C 3.90 2.50 1.00 9.75
EJE 1-1: ENTRE C-D 3.90 2.50 1.00 9.75
EJE 1-1: ENTRE D-E 3.90 2.50 1.00 9.75
EJE 1-1: ENTRE E-F 3.90 2.50 1.00 9.75
EJE 1-1: ENTRE F-G 3.90 2.50 1.00 9.75
EJE 1-1: ENTRE G-H 3.90 2.50 1.00 9.75
EJE 1-1: ENTRE H-I 3.90 2.50 1.00 9.75
EJE 1-1: ENTRE I-J 3.90 2.50 1.00 9.75
lccmarco BLOQUE 02 23
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
lccmarco BLOQUE 02 24
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
ENTRE EJE B-C: ENTRE 1-2 Coche Co 3.85 2.50 2.00 19.25
SSHH 1.95 2.50 2.00 9.75
ENTRE EJE B-C: ENTRE 2-4 2.30 2.50 2.00 11.50
ENTRE EJE B-C: ENTRE 4-5 2.60 2.50 2.00 13.00
ENTRE EJE B-C: ENTRE 5-8 4.85 2.50 2.00 24.25
ENTRE EJE B-C: ENTRE 8-9 Hall Botad 3.85 2.50 2.00 19.25
SSHH 1.95 2.50 2.00 9.75
lccmarco BLOQUE 02 25
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.04.08 SEÑALETICA
03.04.08.01 SEÑAL REGULADORA ADOSADO DE 60X30 4.00 UND
SILENCIO 1.00 1.00
PROHIBIDO FUMAR 1.00 1.00
NO BOTAR BASURA 2.00 2.00
lccmarco BLOQUE 02 26
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
lccmarco BLOQUE 02 27
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.05.01.02.04 TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA, COLOR BLANCO 8.00 UND
SSHH PACIENTES MUJERES 112 2.00 2.00
SSHH PERSONAL MEDICO Y ENFERMERIA 125 4.00 4.00
SSHH PACIENTES VARONES 118 2.00 2.00
03.05.02.02 DEMOLICIONES
03.05.02.02.01 DEMOLICION DE LOSA DE C°S° E=0.15M CON CORTADORA DE CONCRETO 40.25 M2
TUBERIA PVC SAP DE 3/4" 62.30 0.15 1.00 9.35
TUBERIAS PVC DE 1/2" 206.00 0.15 1.00 30.90
lccmarco BLOQUE 02 28
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.05.02.04 TUBERIAS
03.05.02.04.01 TUBERIA PVC SAP DE 1/2" C-10 C/R 206.00 ML
206.00 206.00
03.05.02.05 ACCESORIOS
03.05.02.05.01 CODO PVC SAP Ø 1"x90° 6.00 UND
6.00 6.00
03.05.02.06 VALVULAS
03.05.02.06.01 VALVULA COMPUERTA PESADA DE 3/4" 5.00 UND
5.00 5.00
03.05.02.07.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - LAVATORIO 26.00 PTO
26.00 26.00
03.05.02.07.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - INODORO 8.00 PTO
8.00 8.00
03.05.02.07.04 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - DUCHAS 9.00 PTO
9.00 9.00
lccmarco BLOQUE 02 29
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.05.02.09.02 TANQUE DE POLIETILENO DE 2,500 LITROS, INCLUYE SUMINISTRO E INSTALACION 1.00 UND
1.00 1.00
lccmarco BLOQUE 02 30
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.05.03.05.03 SALIDA DE DESAGUE TUB PVC 2" - LAVADERO DE ACERO 3.00 PTO
RESPOSTERO 110 1.00 1.00
CUARTO LIMPIO 122 1.00 1.00
CUARTO SUCIO 123 1.00 1.00
03.05.03.06 ACCESORIOS
03.05.03.06.01 YEE DE 4"x4" 7.00 UND
7.00 7.00
03.05.03.06.02 YEE DE 4"x2" 18.00 UND
18.00 18.00
03.05.03.06.03 CODO PVC SAL 4"x45° 5.00 UND
5.00 5.00
lccmarco BLOQUE 02 31
PLANILLA DE METRADOS: BLOQUE 02 - LOSA
03.05.05.02.02 REFINE Y NIVELACION DE ZANJA TERRENO NORMAL PARA TUBO 2" - 8" 229.00 ML
EJE PRINCIPAL LOSA 38.50 2.00 77.00
EJE SECUNDARIO LOSA 25.50 1.00 25.50
RED FINAL 126.50 1.00 126.50
03.05.05.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO, E= 10cm 229.00 ML
EJE PRINCIPAL LOSA 38.50 2.00 77.00
EJE SECUNDARIO LOSA 25.50 1.00 25.50
RED FINAL 126.50 1.00 126.50
03.05.05.02.04 RELLENO Y COMPACTADO DE ZANJAS HASTA 1.00M CON MATERIAL PROPIO 229.00 ML
EJE PRINCIPAL LOSA 38.50 2.00 77.00
EJE SECUNDARIO LOSA 25.50 1.00 25.50
RED FINAL 126.50 1.00 126.50
03.05.05.03 TUBERIAS
03.05.05.03.01 TUBERIA PVC SAP DE 8" 229.00 ML
EJE PRINCIPAL LOSA 38.50 2.00 77.00
EJE SECUNDARIO LOSA 25.50 1.00 25.50
RED FINAL 126.50 1.00 126.50
lccmarco BLOQUE 02 32
PLANILLA DE FIERROS : BLOQUE 02 LOSA
CONSTRUCCION DE AMBIENTE DE AISLAMIENTO ; REMODELACION DE AMBIENTE DE
AISLAMIENTO ; ADQUISICION DE CAMA CLINICA RODABLE Y MONITOR DE FUNCIONES VITALES;
IOARR ADEMÁS DE OTROS ACTIVOS EN EL(LA) EESS SANTA ROSA - TAMBOPATA EN LA LOCALIDAD
PUERTO MALDONADO, DISTRITO DE TAMBOPATA, PROVINCIA TAMBOPATA, DEPARTAMENTO
MADRE DE DIOS. CON CODIGO DE INVERSION 2488982
SOBRECIMIENTO PERIMETRAL
Longtiudinal 3/8" 1.00 3.00 108.05 324.15 181.52
Transversal cada 20cm 3/8" 541.00 9.00 0.50 2434.50 1363.32
SOBRECIMIENTO EN INTERIORES
Longtiudinal 3/8" 1.00 3.00 170.04 510.12 285.67
Transversal cada 20cm 3/8" 851.00 9.00 0.50 3829.50 2144.52
MUEBLE TIPO 1
BASE
Longtiudinal cada 25cm 3/8" 4.00 4.00 0.50 8.00 4.48
Transversal cada 17.5cm 3/8" 4.00 4.00 1.20 19.20 10.75
LOSA
Longtiudinal cada 17.5cm 3/8" 1.00 2.00 3.05 6.10 3.42
3/8" 1.00 4.00 0.75 3.00 1.68
Transversal cada 15cm 3/8" 1.00 8.00 0.50 4.00 2.24
MUEBLE TIPO 2
BASE
Longtiudinal cada 25cm 3/8" 4.00 4.00 0.50 8.00 4.48
Transversal cada 17.5cm 3/8" 4.00 4.00 1.20 19.20 10.75
LOSA
Longtiudinal cada 17.5cm 3/8" 2.00 2.00 2.05 8.20 4.59
3/8" 2.00 4.00 0.40 3.20 1.79
Transversal cada 15cm 3/8" 2.00 4.00 0.50 4.00 2.24
INFRAESTRUCTURA
EQUIPAMIENTO
EXPEDIENTE TECNICO
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION
PRESUPUESTO RESUMEN
Item Descripcion
I INFRAESTRUCTURA
II COMPONENTE: EQUIPAMIENTO
EXPEDIENTE TECNICO
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION
S/. 1,000,000.00
15.58% S/. 150,742.63
1,150,742.63
3,021,670.00
3.56% 40,940.00
6.16% 70,850.00
3.31% 38,083.00
4,322,285.63
N
Parcial S/.
1,150,742.63
3,021,670.00
40,940.00
70,850.00
38,083.00
4,322,285.63