ITEM DESCRIPCIÓN UNIDAD CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
1 ESTRUCTURAS.
1.1 ESTRUCTURAS.
1.1.1 MOVIMIENTO DE TIERRAS
1.1.1.1 NIVELACION DE TERRENO
1.1.1.1.1 NIVELACION CON EQUIPO M2 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
233.24
1.1.1.1.1.1 NIVELACION CON MAQUINARIA 1.00 18.59 12.55 233.24
1.1.1.2 EXCAVACIONES
1.1.1.2.1 EXCAVACIONES MANUAL EN CIM M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
2561820.51
EXACAVACION MANUAL PARA ZAPATAS
EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.00 1.42
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.00 1.20
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.00 1.36
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.00 1.62
EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 1.00 1.31
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 1.00 0.86
EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.00 1.42
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.00 1.20
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.00 1.36
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.00 1.62
EJE D-D, ENTRE EJE 4"-4" Y 5-5 1.00 3.10 0.40 1.00 1.24
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 1.00 0.86
1.1.1.3 RELLENOS
1.1.1.3.1 RELLENO CON MATERIAL PROPI M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
1.1.1.3.2 RELLENO CON MATERIAL DE PR M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
13.76
AFIRMADO E=10CM 1.00 AREA= 137.59 0.10 13.76
EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 … 1.42
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 … 1.20
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 … 1.36
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 … 1.62
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 … 0.86
1.1.2.2 CONCRETO PARA CIMIENTO COR M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
12.89
EXCAVACION MANUAL PARA CIMIENTO CORRIDO
EJE 1-1 1.00 6.50 0.40 1.00 2.60
EJE 5-5 1.00 7.41 0.40 1.00 2.96
EJE 5"-5" 1.00 4.31 0.40 1.00 1.72
EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.00 1.42
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.00 1.20
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.00 1.36
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.00 1.62
EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 1.00 1.31
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 1.00 1.19
EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.00 1.42
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.00 1.20
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.00 1.36
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.00 1.62
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 1.00 0.86
5.16
CONCRETO PARA SOBRECIMIENTO
EJE 1-1 1.00 6.50 0.40 0.40 1.04
EJE 5-5 1.00 7.41 0.40 0.40 1.19
EJE 5"-5" 1.00 4.31 0.40 0.40 0.69
EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 0.40 0.57
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 0.40 0.48
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 0.40 0.54
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 0.40 0.65
EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 0.40 0.52
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 0.40 0.48
EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 0.40 0.57
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 0.40 0.48
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 0.40 0.54
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 0.40 0.65
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 0.40 0.35
1.1.2.4 FALSO PISO DE CONCRETO M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
23.22
FALSO PISO E=0.10M 1.00 20.00 11.61 0.10 23.22
14.99
Z1 12.00 1.20 1.20 0.70 12.10
Z2 2.00 0.90 1.40 0.70 1.76
Z3 2.00 0.90 0.90 0.70 1.13
224.53
Z1
ACERO LONGITUDINAL 1/2" 12.00 9.00 1.05 0.99 112.27
ACERO TRANSVERSAL 1/2" 12.00 9.00 1.05 0.99 112.27
Z2
ACERO LONGITUDINAL 1/2" 5.00 9.00 1.05 0.99 46.78
ACERO TRANSVERSAL 1/2" 5.00 9.00 1.05 0.99 46.78
Z3
ACERO LONGITUDINAL 1/2" 5.00 9.00 1.05 0.99 46.78
ACERO TRANSVERSAL 1/2" 5.00 9.00 1.05 0.99 46.78
8.39
CONCRETO PARA VIGAS DE CIMENTACIÓN
EJE 1-1 1.00 6.50 0.40 0.40 1.04
EJE 5-5 1.00 7.41 0.40 0.40 1.19
EJE 5"-5" 1.00 4.31 0.40 0.40 0.69
EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 0.40 0.57
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 0.40 0.48
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 0.40 0.54
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 0.40 0.65
EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 0.40 0.52
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 0.40 0.48
EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 0.40 0.57
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 0.40 0.48
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 0.40 0.54
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 0.40 0.65
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 0.40 0.35
1.1.3.2.2 ENCOFRADO Y DESENCOFRADO E M2 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
20.98
CONCRETO PARA VIGAS DE CIMENTACIÓN
EJE 1-1 1.00 6.50 … 0.40 2.60
EJE 5-5 1.00 7.41 … 0.40 2.96
EJE 5"-5" 1.00 4.31 0.40 1.72
…
EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 … 0.40 1.42
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 … 0.40 1.20
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.36
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 … 0.40 1.62
…
EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 1.31
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 1.19
EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.42
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.20
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.36
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.62
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 0.86
1.1.3.2.3 ACERO DE REFUERZO EN VIGAS KG CANTIDAD Nª DE PIEZAS LONGITUD KG/M METRADO
467.28
ACERO DE REFUERZO PARA VIGAS DE CIMENTACIÓN
EJE 1-1
ACERO LONGITUDINAL 3/8" 1.00 6.00 7.19 0.56 24.16
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77
EJE 5-5
ACERO LONGITUDINAL 3/8" 1.00 6.00 11.03 0.56 37.06
ESTRIBOS 3/8" 1.00 35.00 1.14 0.56 22.34
EJE 5"-5"
ACERO LONGITUDINAL 3/8" 1.00 6.00 4.31 0.56 14.48
ESTRIBOS 3/8" 1.00 22.00 1.14 0.56 14.04
EJE A-A, ENTRE EJE 1-1 Y 2-2
ACERO LONGITUDINAL 3/8" 1.00 6.00 6.55 0.56 22.01
ESTRIBOS 3/8" 1.00 24.00 1.14 0.56 15.32
EJE A-A, ENTRE EJE 2-2 Y 3-3
ACERO LONGITUDINAL 3/8" 1.00 6.00 4.41 0.56 14.82
ESTRIBOS 3/8" 1.00 16.00 1.14 0.56 10.21
1.1.3.3 COLUMNAS
1.1.3.3.1 CONCRETO EN COLUMNAS M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
7.72
C1 10.00 0.40 0.25 5.15 5.15
C2 6.00 0.25 0.15 5.15 1.16
C3 2.00 0.30 0.15 5.15 0.46
C4 2.00 AREA 0.07 6.76 0.95
147.45
C1 10.00 PERÍMETRO= 1.30 5.15 66.95
C2 6.00 PERÍMETRO= 0.80 5.15 24.72
C3 2.00 PERÍMETRO= 0.90 5.15 9.27
C4 2.00 PERÍMETRO= 3.44 6.76 46.51
755.96
C1
REFUERZO VERTICAL 4Ø1/2" 10.00 4.00 5.10 0.99 201.96
REFUERZO VERTICAL 2 Ø3/8" 10.00 2.00 5.10 0.56 57.12
ESTRIBOS 3/8" 10.00 25.00 1.34 0.56 187.60
C2
REFUERZO VERTICAL 4 Ø3/8" 6.00 4.00 5.10 0.56 68.54
ESTRIBOS 3/8" 6.00 25.00 1.34 0.56 112.56
C3
REFUERZO VERTICAL 4 Ø3/8" 2.00 4.00 5.10 0.56 22.85
ESTRIBOS 3/8" 2.00 25.00 1.34 0.56 37.52
C4
REFUERZO VERTICAL 4 Ø3/8" 2.00 4.00 6.76 0.56 30.28
ESTRIBOS 3/8" 2.00 25.00 1.34 0.56 37.52
1.1.3.4 VIGAS
1.1.3.4.1 CONCRETO EN VIGAS M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
2.10
CONCRETO PARA VIGAS
EJE 1-1 1.00 6.50 0.15 0.25 0.24
EJE 5-5 1.00 7.41 0.15 0.25 0.28
EJE 5"-5" 1.00 4.31 0.15 0.25 0.16
EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.15 0.25 0.13
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.15 0.25 0.11
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.15 0.25 0.13
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.15 0.25 0.15
EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.15 0.25 0.12
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.15 0.25 0.11
EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.15 0.25 0.13
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.15 0.25 0.11
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.15 0.25 0.13
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.15 0.25 0.15
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.15 0.40 0.13
35.50
ENCOFRADO DE VIGAS
EJE 1-1 1.00 6.50 PERÍMETRO= 0.65 4.23
EJE 5-5 1.00 7.41 PERÍMETRO= 0.65 4.82
EJE 5"-5" 1.00 4.31 PERÍMETRO= 0.65 2.80
EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 PERÍMETRO= 0.65 2.31
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 PERÍMETRO= 0.65 1.95
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 PERÍMETRO= 0.65 2.21
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 PERÍMETRO= 0.65 2.63
EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 PERÍMETRO= 0.65 2.13
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 PERÍMETRO= 0.65 1.93
EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 PERÍMETRO= 0.65 2.31
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 PERÍMETRO= 0.65 1.95
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 PERÍMETRO= 0.65 2.21
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 PERÍMETRO= 0.65 2.63
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 PERÍMETRO= 0.65 1.40
247.12
ACERO DE REFUERZO EN VIGAS
EJE 1-1
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 9.07 0.56 20.32
ESTRIBOS Ø1/4" 2.00 36.00 0.84 0.22 13.31
EJE 5-5
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 10.34 0.56 23.16
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE 5"-5"
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.57 0.56 10.24
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE A-A, ENTRE EJE 1-1 Y 2-2
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 5.14 0.56 11.51
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE A-A, ENTRE EJE 2-2 Y 3-3
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.46 0.56 9.99
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE A-A, ENTRE EJE 3-3 Y 4-4
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.86 0.56 10.89
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE A-A, ENTRE EJE 4-4 Y 5-5
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 5.64 0.56 12.63
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE C-C, ENTRE EJE 5-5 Y 5"-5"
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 2.42 0.56 5.42
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 1-1 Y 2-2
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 5.14 0.56 11.51
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 2-2 Y 3-3
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.46 0.56 9.99
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 3-3 Y 4-4
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.84 0.56 10.84
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 4-4 Y 5-5
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 5.64 0.56 12.63
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 55 Y 5"-5"
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 2.16 0.56 4.84
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
PLANILLA DE M
PROYECTO:
UBICACIÓN:
ENTIDAD: MUNICIPALIDAD DISTRITAL DE BELLAVISTA
N° PARTIDA / DESCRIPCION
1.2 ARQUITECTURA
1.2.1 MUROS Y TABIQUES DE ALBAÑILERIA
1.2.1.1 MURO DE BLOQUETA 40X20X10 DE SOGA
PAREDES
MURO
VIGA
COLUMNA
COLUMNA1
COLUMNA 2
REVESTIMIENTO DE DERRAMES
SOBRECIMIENTO
1.2.3 CIELORASOS
1.2.3.1 CIELORASOS CON PANEL OSB DE 6.00 MM
SALA MULTIUSOS
1.2.3.2 ALERO DE TECHO CON PANEL OBS
ALERO LONGITUDINAL1
ALERO LONGITUDINAL2
1.2.3.3 FRISOS DE FIBROCEMENTO DE 6.00 MM
FRISOS LATERALES
FRISOS LONGITUDINALES 1
FRISOS LONGITUDINAL2
1.2.6.2 VENTANA V2
1.2.7 CERRAJERIA
1.2.7.1 CERRADURA PARA PUERTA EXTERIOR FORTE DOS GOLPES
1.2.7.2 BISAGRA ALUMINIZADA CAPUCHINA DE 3"X3"
1.2.7.3 MANIJA DE BRONCE PARA PUERTAS
1.2.7.4 VIDRIOS, CRISTALES Y SIMILARES
1.2.7.4.1 VIDRIOS SEMIDOBLES INCOLORO CRUDO
1.2.8 PINTURA
1.2.8.1 PINTURA LATEX 2 MANOS EN CIELO RASOS
SALA MULTIUSOS
SS.HH
ALERO DE TECHO CON PANEL FIBROCEMENTO
ALERO LONGITUDINAL 1
ALERO LONGITUDINAL 2
1.2.8.2 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES VIGAS Y COLUMNAS
TARRAJEO
MURO
VIGA
COLUMNA
COLUMNA1
COLUMNA 2
REVESTIMIENTO DE DERRAMES
SOBRECIMIENTO
PLANILLA DE METRADOS - AR
URO
GA 46.06
OLUMNA
2.10
2.10
EVESTIMIENTO DE DERRAMES
OBRECIMIENTO 49.98
ELORASOS
ELORASOS CON PANEL OSB DE 6.00 MM
SALA MULTIUSOS 16.60
LERO DE TECHO CON PANEL OBS
ALERO LONGITUDINAL1 21.85
ALERO LONGITUDINAL2 21.85
RISOS DE FIBROCEMENTO DE 6.00 MM
FRISOS LATERALES
FRISOS LONGITUDINALES 1 21.85
FRISOS LONGITUDINAL2 21.85
SOS Y PAVIMENTOS
SO DE CONCRETO PULIDO Y BRUÑADO DE E= 2"
SALA MULTIUSOS 16.60
EREDA DE 4" INCLUYECANALETA FC = 140KG/CM2
EREDA LONGITUDINAL 1 25.70
EREDA LONGITUDINAL 2 25.70
EREDA LATERAL 8.35
SO CERAMICA ANTIDEZLIZANTE BAÑO 4.30
ARPINTERIA DE MADERA
UERTA DE MADERA DE CEDRO DE 2.55X1.50 M INCLUYE COLOCACION Y PINTADO
ENTANAS
ENTANA V1 1
ENTANA V2 1.15
ERRAJERIA
ERRADURA PARA PUERTA EXTERIOR FORTE DOS GOLPES
SAGRA ALUMINIZADA CAPUCHINA DE 3"X3"
ANIJA DE BRONCE PARA PUERTAS
DRIOS, CRISTALES Y SIMILARES
DRIOS SEMIDOBLES INCOLORO CRUDO 1.50
NTURA
NTURA LATEX 2 MANOS EN CIELO RASOS
SALA MULTIUSOS 16.60
SS.HH 4.30
ALERO DE TECHO CON PANEL FIBROCEMENTO
ALERO LONGITUDINAL 1 21.85
ALERO LONGITUDINAL 2 21.85
NTURA LATEX 2 MANOS EN MUROS EXTERIORES VIGAS Y COLUMNAS
ARRAJEO
MURO
VIGA 46.06
COLUMNA
COLUMNA1 1.82
COLUMNA 2 1.82
REVESTIMIENTO DE DERRAMES
SOBRECIMIENTO 49.98
METRADOS - ARQUITECTURA
FECHA: Aug-23
AMBIENTE DE SERVICIOS
BLOQUE:
GENERALES
N° METRAD
ANCHO ALTO ESPESOR AREA VOLUMEN NUMERO DE VECES QUE SE PARCIAL
(m) (m) (m) (m2) (m3) ELEMENTOS REPITE
85.70
1.00
1.65 6.00 4.00
3.00 2.00
8.00
3.00 2.00
85.70 M2
26.21 KG
M2
144.42 M2
42.83 M2
22.18 M2
101.09 M2
120.23 M2
4.00 UND
3.00 UND
2.00 UND.
8.00 PZA
2.00 UND.
2.73 P2
158.37 M2
401.20 M2
PROYECTO: CREACION DE LOS SERVICIOS PÚBLICOS DE INTEGRACION ECONÓMICA Y SOCIAL (CASA COMUNAL) EN EL CASERÍO CHARAPE DEL SITRITO DE TABACONAS-PRO
DE CAJAMARCA
UBICACIÓN: CASERÍO CHARAPE, DITRITO DE TABACONAS-PROVINCIA DE SAN IGNACIO-DEPARTAMENTO DE CAJAMARCA
ENTIDAD: MUNICIPALIDAD DISTRITAL DE TABACONAS
1.00
1.3.2 SALIDAS
1.3.2.1 SALIDA PARA LUMINARIAS EXTERNAS PTO. CANTIDAD
13.00
15.00
2.00
CIRCUITO 4 1.00
CIRCUITO 1 1.00
CIRCUITO 2 1.00
CIRCUITO 3 1.00
1.00
1.00
1.00
CHARAPE DEL SITRITO DE TABACONAS-PROVINCIA DE SAN IGNACIO-DEPARTAMENTO
FECHA: Sep-21
BLOQUE: AMBIENTE DE SERVICIOS GENERALES
###