PROYECTO:

UBICACIÓN: FECHA: Aug-23

ENTIDAD: MUNICIPALIDAD DISTRITAL DE BELLAVISTA BLOQUE: AMBIENTE DE SERVICIOS GENERALES

ITEM DESCRIPCIÓN UNIDAD CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

1 ESTRUCTURAS.
1.1 ESTRUCTURAS.
1.1.1 MOVIMIENTO DE TIERRAS
1.1.1.1 NIVELACION DE TERRENO
1.1.1.1.1 NIVELACION CON EQUIPO M2 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

233.24
1.1.1.1.1.1 NIVELACION CON MAQUINARIA 1.00 18.59 12.55 233.24

1.1.1.2 EXCAVACIONES
1.1.1.2.1 EXCAVACIONES MANUAL EN CIM M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

2561820.51
EXACAVACION MANUAL PARA ZAPATAS

Z1 12.00 1.20 1.20 0.70 12.10


Z2 2.00 0.90 1.40 0.70 1.76
Z3 2.00 0.90 0.90 0.70 1.13
ZAPATA CORRIDA EXCAVACION PARA CANALETA
1.00 53.69 0.40 0.40 8.59

EXCAVACION MANUAL PARA CIMIENTO CORRIDO 2561774.00


EJE 1-1 1.00 6.50 0.40 1.00 2.60
EJE 5-5 1.00 7.41 0.40 1.00 2.96
EJE 5"-5" 1.00 4.71 0.40 1.00 1.88

EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.00 1.42
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.00 1.20
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.00 1.36
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.00 1.62

EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 1.00 1.31
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 1.00 0.86

EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.00 1.42
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.00 1.20
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.00 1.36
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.00 1.62
EJE D-D, ENTRE EJE 4"-4" Y 5-5 1.00 3.10 0.40 1.00 1.24
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 1.00 0.86

1.1.1.3 RELLENOS
1.1.1.3.1 RELLENO CON MATERIAL PROPI M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

RELLENO DE CIMENTACIONES 3330366.66


SE TOMARÁ LA DIFERENCIA
ENTRE VOLUMEN DE
EXCAVACION MENOS VOLUMEN
DE CONCRETO DE CIMENTACION VOL CORTE= 3330366.66 VOL CONC.

1.1.1.3.2 RELLENO CON MATERIAL DE PR M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

13.76
AFIRMADO E=10CM 1.00 AREA= 137.59 0.10 13.76

1.1.2 OBRAS DE CONCRETO SIMPLE


1.1.2.1 SOLADOS DE CONCRETO 1:12, E M2 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO
64.74

EXACAVACION MANUAL PARA ZAPATAS


Z1 12.00 1.20 1.20 … 17.28
Z2 2.00 0.90 1.40 2.52
Z3 2.00 0.90 0.90 1.62
ZAPATA CORRIDA EXCAVACION PARA CANALETA
1.00 53.69 0.40 … 21.48
EXCAVACION MANUAL PARA CIMIENTO CORRIDO
EJE 1-1 1.00 6.50 0.40 … 2.60
EJE 5-5 1.00 7.41 0.40 … 2.96
EJE 5"-5" 1.00 4.31 0.40 1.72

EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 … 1.42
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 … 1.20
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.36
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 … 1.62

EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 … 1.31
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 … 1.19

EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 … 1.42
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 … 1.20
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 … 1.36
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 … 1.62
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 … 0.86
1.1.2.2 CONCRETO PARA CIMIENTO COR M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

12.89
EXCAVACION MANUAL PARA CIMIENTO CORRIDO
EJE 1-1 1.00 6.50 0.40 1.00 2.60
EJE 5-5 1.00 7.41 0.40 1.00 2.96
EJE 5"-5" 1.00 4.31 0.40 1.00 1.72

EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.00 1.42
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.00 1.20
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.00 1.36
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.00 1.62

EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 1.00 1.31
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 1.00 1.19

EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.00 1.42
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.00 1.20
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.00 1.36
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.00 1.62
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 1.00 0.86

1.1.2.3 SOBRECIMIENTO M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

5.16
CONCRETO PARA SOBRECIMIENTO
EJE 1-1 1.00 6.50 0.40 0.40 1.04
EJE 5-5 1.00 7.41 0.40 0.40 1.19
EJE 5"-5" 1.00 4.31 0.40 0.40 0.69

EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 0.40 0.57
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 0.40 0.48
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 0.40 0.54
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 0.40 0.65

EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 0.40 0.52
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 0.40 0.48

EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 0.40 0.57
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 0.40 0.48
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 0.40 0.54
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 0.40 0.65
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 0.40 0.35

1.1.2.4 FALSO PISO DE CONCRETO M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

23.22
FALSO PISO E=0.10M 1.00 20.00 11.61 0.10 23.22

1.1.3 OBRAS DE CONCRETO ARMADO


1.1.3.1 ZAPATAS AISLADAS
1.1.3.1.1 CONCRETO EN ZAPATAS M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

14.99
Z1 12.00 1.20 1.20 0.70 12.10
Z2 2.00 0.90 1.40 0.70 1.76
Z3 2.00 0.90 0.90 0.70 1.13

1.1.3.1.2 ACERO DE REFUERZO EN ZAPATA KG CANTIDAD Nª DE PIEZAS LONGITUD KG/M METRADO

224.53
Z1
ACERO LONGITUDINAL 1/2" 12.00 9.00 1.05 0.99 112.27
ACERO TRANSVERSAL 1/2" 12.00 9.00 1.05 0.99 112.27

Z2
ACERO LONGITUDINAL 1/2" 5.00 9.00 1.05 0.99 46.78
ACERO TRANSVERSAL 1/2" 5.00 9.00 1.05 0.99 46.78

Z3
ACERO LONGITUDINAL 1/2" 5.00 9.00 1.05 0.99 46.78
ACERO TRANSVERSAL 1/2" 5.00 9.00 1.05 0.99 46.78

1.1.3.2 VIGAS DE CIMENTACIÓN


1.1.3.2.1 CONCRETO EN VIGAS DE CIMENT M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

8.39
CONCRETO PARA VIGAS DE CIMENTACIÓN
EJE 1-1 1.00 6.50 0.40 0.40 1.04
EJE 5-5 1.00 7.41 0.40 0.40 1.19
EJE 5"-5" 1.00 4.31 0.40 0.40 0.69

EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 0.40 0.57
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 0.40 0.48
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 0.40 0.54
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 0.40 0.65

EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 0.40 0.52
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 0.40 0.48

EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 0.40 0.57
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 0.40 0.48
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 0.40 0.54
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 0.40 0.65
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 0.40 0.35
1.1.3.2.2 ENCOFRADO Y DESENCOFRADO E M2 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

20.98
CONCRETO PARA VIGAS DE CIMENTACIÓN
EJE 1-1 1.00 6.50 … 0.40 2.60
EJE 5-5 1.00 7.41 … 0.40 2.96
EJE 5"-5" 1.00 4.31 0.40 1.72

EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 … 0.40 1.42
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 … 0.40 1.20
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.36
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 … 0.40 1.62

EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.40 1.31
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.40 1.19

EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.40 1.42
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.40 1.20
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.40 1.36
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.40 1.62
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.40 0.86
1.1.3.2.3 ACERO DE REFUERZO EN VIGAS KG CANTIDAD Nª DE PIEZAS LONGITUD KG/M METRADO

467.28
ACERO DE REFUERZO PARA VIGAS DE CIMENTACIÓN
EJE 1-1
ACERO LONGITUDINAL 3/8" 1.00 6.00 7.19 0.56 24.16
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77
EJE 5-5
ACERO LONGITUDINAL 3/8" 1.00 6.00 11.03 0.56 37.06
ESTRIBOS 3/8" 1.00 35.00 1.14 0.56 22.34

EJE 5"-5"
ACERO LONGITUDINAL 3/8" 1.00 6.00 4.31 0.56 14.48
ESTRIBOS 3/8" 1.00 22.00 1.14 0.56 14.04
EJE A-A, ENTRE EJE 1-1 Y 2-2
ACERO LONGITUDINAL 3/8" 1.00 6.00 6.55 0.56 22.01
ESTRIBOS 3/8" 1.00 24.00 1.14 0.56 15.32
EJE A-A, ENTRE EJE 2-2 Y 3-3
ACERO LONGITUDINAL 3/8" 1.00 6.00 4.41 0.56 14.82
ESTRIBOS 3/8" 1.00 16.00 1.14 0.56 10.21

EJE A-A, ENTRE EJE 3-3 Y 4-4


ACERO LONGITUDINAL 3/8" 1.00 6.00 5.72 0.56 19.22
ESTRIBOS 3/8" 1.00 21.00 1.14 0.56 13.41
EJE A-A, ENTRE EJE 4-4 Y 5-5
ACERO LONGITUDINAL 3/8" 1.00 6.00 5.84 0.56 19.62
ESTRIBOS 3/8" 1.00 22.00 1.14 0.56 14.04
EJE A"-A", ENTRE EJE 4"-4" Y 5-5
ACERO LONGITUDINAL 3/8" 1.00 6.00 5.81 0.56 19.52
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77
EJE C-C, ENTRE EJE 5-5 Y 5"-5"
ACERO LONGITUDINAL 3/8" 1.00 6.00 5.81 0.56 19.52
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77
EJE D-D, ENTRE EJE 1-1 Y 2-2
ACERO LONGITUDINAL 3/8" 1.00 6.00 5.81 0.56 19.52
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77
EJE D-D, ENTRE EJE 2-2 Y 3-3
ACERO LONGITUDINAL 3/8" 1.00 6.00 5.81 0.56 19.52
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77
EJE D-D, ENTRE EJE 3-3 Y 4-4
ACERO LONGITUDINAL 3/8" 1.00 6.00 5.81 0.56 19.52
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77
EJE D-D, ENTRE EJE 4-4 Y 5-5
ACERO LONGITUDINAL 3/8" 1.00 6.00 5.81 0.56 19.52
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77
EJE D-D, ENTRE EJE 5-5 Y 5"-5"
ACERO LONGITUDINAL 3/8" 1.00 6.00 2.16 0.56 7.26
ESTRIBOS 3/8" 1.00 20.00 1.14 0.56 12.77

1.1.3.3 COLUMNAS
1.1.3.3.1 CONCRETO EN COLUMNAS M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

7.72
C1 10.00 0.40 0.25 5.15 5.15
C2 6.00 0.25 0.15 5.15 1.16
C3 2.00 0.30 0.15 5.15 0.46
C4 2.00 AREA 0.07 6.76 0.95

1.1.3.3.2 ENCOFRADO Y DESENCOFRADO D M2 CANTIDAD LONGITUD(M) METRADO

147.45
C1 10.00 PERÍMETRO= 1.30 5.15 66.95
C2 6.00 PERÍMETRO= 0.80 5.15 24.72
C3 2.00 PERÍMETRO= 0.90 5.15 9.27
C4 2.00 PERÍMETRO= 3.44 6.76 46.51

1.1.3.3.3 ACERO DE REFUERZO EN COLUMN KG CANTIDAD Nª DE PIEZAS LONGITUD KG/M METRADO

755.96
C1
REFUERZO VERTICAL 4Ø1/2" 10.00 4.00 5.10 0.99 201.96
REFUERZO VERTICAL 2 Ø3/8" 10.00 2.00 5.10 0.56 57.12
ESTRIBOS 3/8" 10.00 25.00 1.34 0.56 187.60

C2
REFUERZO VERTICAL 4 Ø3/8" 6.00 4.00 5.10 0.56 68.54
ESTRIBOS 3/8" 6.00 25.00 1.34 0.56 112.56

C3
REFUERZO VERTICAL 4 Ø3/8" 2.00 4.00 5.10 0.56 22.85
ESTRIBOS 3/8" 2.00 25.00 1.34 0.56 37.52

C4
REFUERZO VERTICAL 4 Ø3/8" 2.00 4.00 6.76 0.56 30.28
ESTRIBOS 3/8" 2.00 25.00 1.34 0.56 37.52
1.1.3.4 VIGAS
1.1.3.4.1 CONCRETO EN VIGAS M3 CANTIDAD LARGO (m) ANCHO (m) ALTO(m) METRADO

2.10
CONCRETO PARA VIGAS
EJE 1-1 1.00 6.50 0.15 0.25 0.24
EJE 5-5 1.00 7.41 0.15 0.25 0.28
EJE 5"-5" 1.00 4.31 0.15 0.25 0.16

EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.15 0.25 0.13
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.15 0.25 0.11
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.15 0.25 0.13
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.15 0.25 0.15

EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 0.15 0.25 0.12
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 0.15 0.25 0.11

EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 0.15 0.25 0.13
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 0.15 0.25 0.11
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 0.15 0.25 0.13
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 0.15 0.25 0.15
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 0.15 0.40 0.13

1.1.3.4.2 ENCOFRADO Y DESENCOFRADO EN M2 CANTIDAD LONGITUD METRADO

35.50
ENCOFRADO DE VIGAS
EJE 1-1 1.00 6.50 PERÍMETRO= 0.65 4.23
EJE 5-5 1.00 7.41 PERÍMETRO= 0.65 4.82
EJE 5"-5" 1.00 4.31 PERÍMETRO= 0.65 2.80

EJE A-A, ENTRE EJE 1-1 Y 2-2 1.00 3.55 PERÍMETRO= 0.65 2.31
EJE A-A, ENTRE EJE 2-2 Y 3-3 1.00 3.00 PERÍMETRO= 0.65 1.95
EJE A-A, ENTRE EJE 3-3 Y 4-4 1.00 3.40 PERÍMETRO= 0.65 2.21
EJE A-A, ENTRE EJE 4-4 Y 5-5 1.00 4.05 PERÍMETRO= 0.65 2.63

EJE A"-A", ENTRE EJE 4"-4" Y 5-5 1.00 3.27 PERÍMETRO= 0.65 2.13
EJE C-C, ENTRE EJE 5-5 Y 5"-5" 1.00 2.97 PERÍMETRO= 0.65 1.93

EJE D-D, ENTRE EJE 1-1 Y 2-2 1.00 3.55 PERÍMETRO= 0.65 2.31
EJE D-D, ENTRE EJE 2-2 Y 3-3 1.00 3.00 PERÍMETRO= 0.65 1.95
EJE D-D, ENTRE EJE 3-3 Y 4-4 1.00 3.40 PERÍMETRO= 0.65 2.21
EJE D-D, ENTRE EJE 4-4 Y 5-5 1.00 4.05 PERÍMETRO= 0.65 2.63
EJE D-D, ENTRE EJE 5-5 Y 5"-5" 1.00 2.16 PERÍMETRO= 0.65 1.40

1.1.3.4.3 ACERO DE REFUERZO EN VIGAS KG CANTIDAD Nª DE PIEZAS LONGITUD KG/M METRADO

247.12
ACERO DE REFUERZO EN VIGAS
EJE 1-1
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 9.07 0.56 20.32
ESTRIBOS Ø1/4" 2.00 36.00 0.84 0.22 13.31
EJE 5-5
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 10.34 0.56 23.16
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE 5"-5"
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.57 0.56 10.24
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE A-A, ENTRE EJE 1-1 Y 2-2
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 5.14 0.56 11.51
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE A-A, ENTRE EJE 2-2 Y 3-3
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.46 0.56 9.99
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE A-A, ENTRE EJE 3-3 Y 4-4
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.86 0.56 10.89
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE A-A, ENTRE EJE 4-4 Y 5-5
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 5.64 0.56 12.63
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE C-C, ENTRE EJE 5-5 Y 5"-5"
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 2.42 0.56 5.42
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 1-1 Y 2-2
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 5.14 0.56 11.51
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 2-2 Y 3-3
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.46 0.56 9.99
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 3-3 Y 4-4
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 4.84 0.56 10.84
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 4-4 Y 5-5
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 5.64 0.56 12.63
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
EJE D-D, ENTRE EJE 55 Y 5"-5"
ACERO LONGITUDINAL 4Ø3/8" 1.00 4.00 2.16 0.56 4.84
ESTRIBOS Ø1/4" 1.00 36.00 0.84 0.22 6.65
PLANILLA DE M
PROYECTO:

UBICACIÓN:
ENTIDAD: MUNICIPALIDAD DISTRITAL DE BELLAVISTA

N° PARTIDA / DESCRIPCION

1.2 ARQUITECTURA
1.2.1 MUROS Y TABIQUES DE ALBAÑILERIA
1.2.1.1 MURO DE BLOQUETA 40X20X10 DE SOGA
PAREDES

1.2.1.2 ACERO REFUERZOS EN MUROS


LONGITUD INTERMEDIA ACERO 1/4"
LONGITUD EXTREMOS ACERO 1/4"

1.2.2 REVOQUES ENLUCIDOS Y MOLDADURAS


TARRAJEO EN MUROS, VIGAS Y COLUMNAS

MURO
VIGA
COLUMNA
COLUMNA1
COLUMNA 2
REVESTIMIENTO DE DERRAMES
SOBRECIMIENTO

1.2.3 CIELORASOS
1.2.3.1 CIELORASOS CON PANEL OSB DE 6.00 MM
SALA MULTIUSOS
1.2.3.2 ALERO DE TECHO CON PANEL OBS
ALERO LONGITUDINAL1
ALERO LONGITUDINAL2
1.2.3.3 FRISOS DE FIBROCEMENTO DE 6.00 MM
FRISOS LATERALES
FRISOS LONGITUDINALES 1
FRISOS LONGITUDINAL2

1.2.4 PISOS Y PAVIMENTOS


1.2.4.1 PISO DE CONCRETO PULIDO Y BRUÑADO DE E= 2"
SALA MULTIUSOS
1.2.4.2 VEREDA DE 4" INCLUYECANALETA FC = 140KG/CM2
VEREDA LONGITUDINAL 1
VEREDA LONGITUDINAL 2
VEREDA LATERAL
PISO CERAMICA ANTIDEZLIZANTE BAÑO
1.2.5 CARPINTERIA DE MADERA
1.2.5.1 PUERTA DE MADERA DE CEDRO DE 2.55X1.50 M INCLUYE COLOCACION Y PINTADO
1.2.6 VENTANAS
1.2.6.1 VENTANA V1

1.2.6.2 VENTANA V2

1.2.7 CERRAJERIA
1.2.7.1 CERRADURA PARA PUERTA EXTERIOR FORTE DOS GOLPES
1.2.7.2 BISAGRA ALUMINIZADA CAPUCHINA DE 3"X3"
1.2.7.3 MANIJA DE BRONCE PARA PUERTAS
1.2.7.4 VIDRIOS, CRISTALES Y SIMILARES
1.2.7.4.1 VIDRIOS SEMIDOBLES INCOLORO CRUDO
1.2.8 PINTURA
1.2.8.1 PINTURA LATEX 2 MANOS EN CIELO RASOS
SALA MULTIUSOS
SS.HH
ALERO DE TECHO CON PANEL FIBROCEMENTO
ALERO LONGITUDINAL 1
ALERO LONGITUDINAL 2
1.2.8.2 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES VIGAS Y COLUMNAS
TARRAJEO
MURO
VIGA
COLUMNA
COLUMNA1
COLUMNA 2
REVESTIMIENTO DE DERRAMES
SOBRECIMIENTO
PLANILLA DE METRADOS - AR

UNICIPALIDAD DISTRITAL DE BELLAVISTA

ARTIDA / DESCRIPCION LONGITUD


(m)
RQUITECTURA
UROS Y TABIQUES DE ALBAÑILERIA
URO DE BLOQUETA 40X20X10 DE SOGA
AREDES

CERO REFUERZOS EN MUROS


ONGITUD INTERMEDIA ACERO 1/4"
ONGITUD EXTREMOS ACERO 1/4"

EVOQUES ENLUCIDOS Y MOLDADURAS


ARRAJEO EN MUROS, VIGAS Y COLUMNAS

URO
GA 46.06
OLUMNA
2.10
2.10
EVESTIMIENTO DE DERRAMES
OBRECIMIENTO 49.98

ELORASOS
ELORASOS CON PANEL OSB DE 6.00 MM
SALA MULTIUSOS 16.60
LERO DE TECHO CON PANEL OBS
ALERO LONGITUDINAL1 21.85
ALERO LONGITUDINAL2 21.85
RISOS DE FIBROCEMENTO DE 6.00 MM
FRISOS LATERALES
FRISOS LONGITUDINALES 1 21.85
FRISOS LONGITUDINAL2 21.85

SOS Y PAVIMENTOS
SO DE CONCRETO PULIDO Y BRUÑADO DE E= 2"
SALA MULTIUSOS 16.60
EREDA DE 4" INCLUYECANALETA FC = 140KG/CM2
EREDA LONGITUDINAL 1 25.70
EREDA LONGITUDINAL 2 25.70
EREDA LATERAL 8.35
SO CERAMICA ANTIDEZLIZANTE BAÑO 4.30
ARPINTERIA DE MADERA
UERTA DE MADERA DE CEDRO DE 2.55X1.50 M INCLUYE COLOCACION Y PINTADO
ENTANAS
ENTANA V1 1

ENTANA V2 1.15

ERRAJERIA
ERRADURA PARA PUERTA EXTERIOR FORTE DOS GOLPES
SAGRA ALUMINIZADA CAPUCHINA DE 3"X3"
ANIJA DE BRONCE PARA PUERTAS
DRIOS, CRISTALES Y SIMILARES
DRIOS SEMIDOBLES INCOLORO CRUDO 1.50
NTURA
NTURA LATEX 2 MANOS EN CIELO RASOS
SALA MULTIUSOS 16.60
SS.HH 4.30
ALERO DE TECHO CON PANEL FIBROCEMENTO
ALERO LONGITUDINAL 1 21.85
ALERO LONGITUDINAL 2 21.85
NTURA LATEX 2 MANOS EN MUROS EXTERIORES VIGAS Y COLUMNAS
ARRAJEO
MURO
VIGA 46.06
COLUMNA
COLUMNA1 1.82
COLUMNA 2 1.82
REVESTIMIENTO DE DERRAMES
SOBRECIMIENTO 49.98
METRADOS - ARQUITECTURA

FECHA: Aug-23
AMBIENTE DE SERVICIOS
BLOQUE:
GENERALES

N° METRAD
ANCHO ALTO ESPESOR AREA VOLUMEN NUMERO DE VECES QUE SE PARCIAL
(m) (m) (m) (m2) (m3) ELEMENTOS REPITE

85.70

1.00 PESO 0.39 5.60 8.00 17.47


1.00 PESO 0.39 5.60 4.00 8.74

105.70 1.00 2.00 211.40


0.40 12.8968 2.00 25.79
PERIMETRO
1 10.00 21.00
0.85 2.00 3.57
11.074 11.07
0.30 2.00 29.99

8.70 144.42 1.00 144.42

2.00 30.59 1.00 30.59


0.80 12.236 1.00 12.24

7.42 2.00 14.84


0.18 2.75 1.00 2.75
0.30 4.59 1.00 4.59

8.70 101.09 1.00

2.40 43.18 1.00 43.18


1.15 20.69 1.00 20.69
2.35 13.74 2.00 27.47
4.80 14.45 2.00 28.90

1.00
1.65 6.00 4.00

0.4 2.00 3.00

3.00 2.00
8.00
3.00 2.00

2.60 2.73 2.73

6.09 70.7658 1.00 101.09


4.80 14.448 1.00 14.45

2.00 30.59 1.00 30.59


0.80 12.236 1.00 12.24

151.00 1.00 2.00 302.00


0.40 18.424 2.00 36.85
PERIMETRO
1 10.00 18.20
0.85 2.00 3.09
11.074 11.07
0.30 2.00 29.99
METRADO
TOTAL UNIDAD

85.70 M2

26.21 KG

M2

144.42 M2

42.83 M2

22.18 M2

101.09 M2

120.23 M2
4.00 UND

3.00 UND

2.00 UND.
8.00 PZA
2.00 UND.
2.73 P2

158.37 M2

401.20 M2
PROYECTO: CREACION DE LOS SERVICIOS PÚBLICOS DE INTEGRACION ECONÓMICA Y SOCIAL (CASA COMUNAL) EN EL CASERÍO CHARAPE DEL SITRITO DE TABACONAS-PRO
DE CAJAMARCA
UBICACIÓN: CASERÍO CHARAPE, DITRITO DE TABACONAS-PROVINCIA DE SAN IGNACIO-DEPARTAMENTO DE CAJAMARCA
ENTIDAD: MUNICIPALIDAD DISTRITAL DE TABACONAS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD


1.3 INSTALACIONES ELECTRICAS Y MECÁNICAS
1.3.1 CONEXIÓN A LA RED EXTERNA DE MEDIDORES PTO. CANTIDAD

1.00

1.3.2 SALIDAS
1.3.2.1 SALIDA PARA LUMINARIAS EXTERNAS PTO. CANTIDAD

13.00

1.3.2.2 SALIDA PARA LUMINARIAS TIPO FLUORECENTE INTERNAS PTO. CANTIDAD

15.00

1.3.2.3 SALIDA PARA TOMACORRIENTES PTO. CANTIDAD

SALIDAS PARA TOMACORRIENTES 17.00

1.3.2.4 SALIDA PARA INTERRUPTOR SIMPLE PTO. CANTIDAD

INTERRUPTORES SIMPLES 1.00

1.3.2.5 SALIDA PARA INTERRUPTOR DOBLE PTO. CANTIDAD

INTERRUPTORES DOBLES 2.00

1.3.3 CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS


1.3.3.1 TUBERIA 1" PVC-P (2-1x10 THW) M CANTIDAD

2.00

1.3.3.2 TUBERIA 3 /4" PVC-P (2-1x12 THW) M CANTIDAD

CIRCUITO 4 1.00

1.3.3.3 TUBERIA 3 /4" PVC-P (2-1x14 THW) M CANTIDAD

CIRCUITO 1 1.00
CIRCUITO 2 1.00
CIRCUITO 3 1.00

1.3.4 TABLEROS PRINCIPALES


1.3.4.1 TABLERO GENERÁL UND CANTIDAD

1.00

1.3.4.2 TABLERO DE DISTRIBUCIÓN UND CANTIDAD

1.00

1.3.4.3 INSTALACIÓN DEL SISTEMA DE PUESTA A TIERRA UND CANTIDAD

1.00
CHARAPE DEL SITRITO DE TABACONAS-PROVINCIA DE SAN IGNACIO-DEPARTAMENTO

FECHA: Sep-21
BLOQUE: AMBIENTE DE SERVICIOS GENERALES

LARGO (m) ANCHO (m) ALTO(m) METRADO

LARGO (m) ANCHO (m) ALTO(m) METRADO


1.00

###

LARGO (m) ANCHO (m) ALTO(m) METRADO


13.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


15.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


17.00
17.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


1.00
1.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


2.00
2.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


10.00
5.00 10.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


25.00
25.00 25.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


75.00
25.00 25.00
25.00 25.00
25.00 25.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


1.00
1.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


2.00
2.00

LARGO (m) ANCHO (m) ALTO(m) METRADO


1.00
1.00