01 OBRAS PROVISIONALES
´02 OBRAS PRELIMINARES
02.01 LIMPIEZA DE TERRENO MANUAL m2 area 125.30
1.00 125.30 125.30
02.02 TRAZO NIVELES Y REPLANTEO
Z-2
Z-3
Z-4
04.03.02 Columnas
04.03.02.03 CONCRETO F´C 210 KG/CM2 COLUMNA 4451.47
C-1
6.80
5/8" 4 4 1.55 168.86
0.30 0.3
6.80
ESTRIBOS
0.25
3/8 48 29 1.00 0.56 779.52
0.25
C-2
6.80
5/8" 6 4 1.55 253.29
0.30 0.3
6.80
ESTRIBOS
0.25
3/8 48 29 1.50 0.56 1169.28
0.6
C-3
6.80
5/8" 6 4 1.55 253.29
0.30 0.3
6.80
ESTRIBOS
0.25
3/8 48 29 1.30 0.56 1013.38
0.4
C-4
6.80
1/2" 6 2 6.80 0.99 81.11
0.30 0.3
ESTRIBOS
VOLADIZO
0.70
1/2" 19 1 0.70 0.99 13.17
0.15 0.15
04.03.03 ESCALERA
04.03.03.03 CONCRETO F´C 210 KG/CM2 viga 34.39
TRAMO 01,02,03
0.90
3/8" 1 6 0.90 0.56 3.02
TRAMO 01,02,03
4.01
1/2" 1 6 4.01 0.99 23.92
ESTRIBOS
0.175
3/8 1 14 0.95 0.56 7.45
0.3